1 |
35279213 |
INSTALLATION OF FILTER AND PURIFER AT SUPUR GP OFFICE TO PRVIDE PUBLIC SAFE DRINKING WATER |
200000 |
INSTALLATION OF FILTER AND PURIFER AT SUPUR GP OFFICE TO PRVIDE PUBLIC SAFE DRINKING WATER1 |
Completion of work |
-
latitude : 22.9735313
Longitude : 86.8724596
file name : Image_12052022123937227.png
|
2022-05-12 12:39:37.344128 |
2 |
35279213 |
INSTALLATION OF FILTER AND PURIFER AT SUPUR GP OFFICE TO PRVIDE PUBLIC SAFE DRINKING WATER |
200000 |
INSTALLATION OF FILTER AND PURIFER AT SUPUR GP OFFICE TO PRVIDE PUBLIC SAFE DRINKING WATER1 |
Completion of work |
-
latitude : 23.0093316
Longitude : 86.8726932
file name : Image_25032022130426523.png
|
2022-03-25 13:04:26.608266 |
3 |
57090716 |
Cost of GP areas tube well maintain |
300000 |
Cost of GP areas tube well maintain1 |
Completion of work |
-
latitude : 23.00952
Longitude : 86.8729282
file name : Image_09062022120048199.png
|
2022-06-09 12:00:48.295718 |
4 |
56706851 |
Const of cc drain Sibu Bauri house to Samar Mandal house at Baragarh for waste water and healt |
300000 |
Const of cc drain Sibu Bauri house to Samar Mandal house at Baragarh for waste water and healt 1 |
Completion of work |
-
latitude : 23.00396091,23.00396091
Longitude : 86.86676059,86.86676059
file name : Image_31032023134030202.png
|
2023-03-31 13:40:30.327204 |
5 |
56706851 |
Const of cc drain Sibu Bauri house to Samar Mandal house at Baragarh for waste water and healt |
300000 |
Const of cc drain Sibu Bauri house to Samar Mandal house at Baragarh for waste water and healt 1 |
Completion of work |
-
latitude : 23.00397366,23.00397521
Longitude : 86.8668172,86.86681703
file name : Image_24012023131543518.png
|
2023-01-24 13:15:43.628222 |
6 |
56706851 |
Const of cc drain Sibu Bauri house to Samar Mandal house at Baragarh for waste water and healt |
300000 |
Const of cc drain Sibu Bauri house to Samar Mandal house at Baragarh for waste water and healt 1 |
Completion of work |
-
latitude : 23.00396521,23.0039638
Longitude : 86.86680072,86.86679967
file name : Image_24012023131129993.png
|
2023-01-24 13:11:30.098307 |
7 |
56706851 |
Const of cc drain Sibu Bauri house to Samar Mandal house at Baragarh for waste water and healt |
300000 |
Const of cc drain Sibu Bauri house to Samar Mandal house at Baragarh for waste water and healt 1 |
Completion of work |
-
latitude : 23.0039991,23.00399876
Longitude : 86.86685877,86.86685824
file name : Image_23012023161539813.png
|
2023-01-23 16:15:39.913912 |
8 |
56706851 |
Const of cc drain Sibu Bauri house to Samar Mandal house at Baragarh for waste water and healt |
300000 |
Const of cc drain Sibu Bauri house to Samar Mandal house at Baragarh for waste water and healt 1 |
Completion of work |
-
latitude : 23.00400569,23.00400464
Longitude : 86.86683202,86.8668319
file name : Image_23012023161719979.png
|
2023-01-23 16:17:20.080416 |
9 |
56706851 |
Const of cc drain Sibu Bauri house to Samar Mandal house at Baragarh for waste water and healt |
300000 |
Const of cc drain Sibu Bauri house to Samar Mandal house at Baragarh for waste water and healt 1 |
Completion of work |
-
latitude : 23.00399585,23.00399585
Longitude : 86.86685875,86.86685875
file name : Image_23012023161824945.png
|
2023-01-23 16:18:25.039822 |
10 |
57091194 |
Cost of water testing |
100000 |
Cost of water testing1 |
Completion of work |
-
latitude : 22.98513258
Longitude : 86.89028489
file name : Image_13032023131100301.png
|
2023-03-13 13:11:00.41814 |
11 |
57091194 |
Cost of water testing |
100000 |
Cost of water testing1 |
Completion of work |
-
latitude : 22.98511977
Longitude : 86.89020543
file name : Image_13032023131144896.png
|
2023-03-13 13:11:44.987534 |
12 |
35287110 |
FOR SAFE DRINKING WATER AND MAINTANENCE OF TUBE WELL INCLUDING MECHANICK WAGES |
500000 |
FOR SAFE DRINKING WATER AND MAINTANENCE OF TUBE WELL INCLUDING MECHANICK WAGES1 |
Plinth level |
-
latitude : 23.0210891
Longitude : 86.858628
file name : Image_31032022185605026.png
|
2022-03-31 18:56:05.191076 |
13 |
49269206 |
INSTALLATION OF TUBE WELL AT HARARDANGA NEAR HARADHAN MURMU HOUSE |
90000 |
INSTALLATION OF TUBE WELL AT HARARDANGA NEAR HARADHAN MURMU HOUSE1 |
Completion of work |
-
latitude : 22.99029666666667
Longitude : 86.839795
file name : Image_06122021175724168.png
|
2021-12-06 17:57:24.261223 |
14 |
49269206 |
INSTALLATION OF TUBE WELL AT HARARDANGA NEAR HARADHAN MURMU HOUSE |
90000 |
INSTALLATION OF TUBE WELL AT HARARDANGA NEAR HARADHAN MURMU HOUSE1 |
Completion of work |
-
latitude : 22.990421666666666
Longitude : 86.83972166666666
file name : Image_04122021130255328.png
|
2021-12-04 13:02:55.401418 |
15 |
49269428 |
INSTALLATION OF TUBE WELL AT MURAGRAM JAM PARA |
90000 |
INSTALLATION OF TUBE WELL AT MURAGRAM JAM PARA1 |
Completion of work |
-
latitude : 22.994370000000004
Longitude : 86.88279666666668
file name : Image_25112021124359233.png
|
2021-11-25 12:43:59.346055 |
16 |
49269748 |
INSTALLATION OF TUBEWELL AT MADHUPUR INCLUDING PLATFORM DRAIN SOCK PIT ETC |
90000 |
INSTALLATION OF TUBEWELL AT MADHUPUR INCLUDING PLATFORM DRAIN SOCK PIT ETC1 |
Completion of work |
-
latitude : 22.994978333333332
Longitude : 86.85296000000001
file name : Image_03112021153005765.png
|
2021-11-03 15:30:05.858196 |
17 |
49269748 |
INSTALLATION OF TUBEWELL AT MADHUPUR INCLUDING PLATFORM DRAIN SOCK PIT ETC |
90000 |
INSTALLATION OF TUBEWELL AT MADHUPUR INCLUDING PLATFORM DRAIN SOCK PIT ETC1 |
Completion of work |
-
latitude : 22.999036666666665
Longitude : 86.84519666666665
file name : Image_03112021153010297.png
|
2021-11-03 15:30:10.375064 |
18 |
34601042 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM DURGA MANDIR TO JHAKALTAL AT SUPUR NAMA PARA |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM DURGA MANDIR TO JHAKALTAL AT SUPUR NAMA PARA1 |
Completion of work |
-
latitude : 23.0156012,23.01560121
Longitude : 86.86546551,86.86546551
file name : Image_22022021154711182.png
|
2021-02-22 15:47:11.264651 |
19 |
34387649 |
INSTALLATION TUBE WELL NEAR AKUL PAL HOUSE AT RAMSOLE INCLUDING PLATFORM DRAIN AND SOCK PIT ETC |
80000 |
INSTALLATION TUBE WELL NEAR AKUL PAL HOUSE AT RAMSOLE INCLUDING PLATFORM DRAIN AND SOCK PIT ETC1 |
Completion of work |
-
latitude : 23.01718038
Longitude : 86.87216826
file name : Image_27022021120403266.png
|
2021-02-27 12:04:03.320644 |
20 |
34604089 |
INSTALLATION TUBE WELL NEAR SANJOY MANDAL HOUSE AT BAGERDIHI WITH PLATFORM DRAIN AND SOCK PIT |
80000 |
INSTALLATION TUBE WELL NEAR SANJOY MANDAL HOUSE AT BAGERDIHI WITH PLATFORM DRAIN AND SOCK PIT 1 |
Completion of work |
-
latitude : 22.995878333333334
Longitude : 86.866105
file name : Image_22072021122111935.png
|
2021-07-22 12:21:12.038231 |
21 |
34604089 |
INSTALLATION TUBE WELL NEAR SANJOY MANDAL HOUSE AT BAGERDIHI WITH PLATFORM DRAIN AND SOCK PIT |
80000 |
INSTALLATION TUBE WELL NEAR SANJOY MANDAL HOUSE AT BAGERDIHI WITH PLATFORM DRAIN AND SOCK PIT 1 |
Completion of work |
-
latitude : 22.99388333333333
Longitude : 86.86489333333333
file name : Image_22072021122215970.png
|
2021-07-22 12:22:16.066953 |
22 |
34558510 |
INSTALLATION TUBE WELL NEAR KANAI DAS HOUSE AT MIRGIPAHARI WITH PLATFORM DRAIN SOCK PIT |
80000 |
INSTALLATION TUBE WELL NEAR KANAI DAS HOUSE AT MIRGIPAHARI WITH PLATFORM DRAIN SOCK PIT 1 |
Completion of work |
-
latitude : 23.03035225
Longitude : 86.8887449
file name : Image_27022021113817731.png
|
2021-02-27 11:38:17.801042 |
23 |
34579455 |
INSTALLATION TUBE WELL NEAR GRAM STHAN AT RAIDIHI INCLUDING PLATFORM DRAIN AND SOCK PIT ETC |
80000 |
INSTALLATION TUBE WELL NEAR GRAM STHAN AT RAIDIHI INCLUDING PLATFORM DRAIN AND SOCK PIT ETC1 |
Completion of work |
-
latitude : 23.005595000000003
Longitude : 86.87734999999999
file name : Image_22072021123754148.png
|
2021-07-22 12:37:54.249771 |
24 |
34593164 |
INSTALLATION TUBE WELL NEAR ACHALA BAURI HOUSE AT VEDUARA INCLUDING PLATFORM DRAIN AND SOCK PIT ETC |
80000 |
INSTALLATION TUBE WELL NEAR ACHALA BAURI HOUSE AT VEDUARA INCLUDING PLATFORM DRAIN AND SOCK PIT ETC1 |
Completion of work |
-
latitude : 23.0333573
Longitude : 86.84989906
file name : Image_27022021104842452.png
|
2021-02-27 10:48:42.539695 |
25 |
34572148 |
INSTALLATION TUBE WELL NEAR AMIT PATI HOUSE INCLUDING PLATFORM DRAIN AND SOCK PIT ETC |
80000 |
INSTALLATION TUBE WELL NEAR AMIT PATI HOUSE INCLUDING PLATFORM DRAIN AND SOCK PIT ETC1 |
Completion of work |
-
latitude : 23.02682798
Longitude : 86.85704614
file name : Image_27022021101053673.png
|
2021-02-27 10:10:53.733048 |
26 |
34579899 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KARALI DAS TO VIM DAS AT RAIDIHI |
200000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KARALI DAS TO VIM DAS AT RAIDIHI1 |
Completion of work |
-
latitude : 23.01210744,23.01210858
Longitude : 86.87328002,86.87328075
file name : Image_01032021134752234.png
|
2021-03-01 13:47:52.323821 |
27 |
34630853 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM VARAT MANDAL HOUSE TO AKKUR MANDAL HOUSE AT DURAJ PUR |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM VARAT MANDAL HOUSE TO AKKUR MANDAL HOUSE AT DURAJ PUR1 |
Completion of work |
-
latitude : 22.99400171,22.99399961
Longitude : 86.84525477,86.84525544
file name : Image_22022021131220949.png
|
2021-02-22 13:12:20.999485 |
28 |
39039265 |
CONST OF CC DRAIN FROM MANIK BAURI HOUSE TO BAURI DOBA AT BHEDUARA |
200000 |
CONST OF CC DRAIN FROM MANIK BAURI HOUSE TO BAURI DOBA AT BHEDUARA1 |
Completion of work |
-
latitude : 23.01664743,23.01664859
Longitude : 86.8430568,86.84306164
file name : Image_25022021151549684.png
|
2021-02-25 15:15:49.741982 |
29 |
34633696 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM MAIN PITCH GHOSH PARA LAST AT DUBRAJPUR |
241028 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM MAIN PITCH GHOSH PARA LAST AT DUBRAJPUR1 |
Completion of work |
-
latitude : 22.99501735,22.99501656
Longitude : 86.84676576,86.84677691
file name : Image_22022021114902307.png
|
2021-02-22 11:49:02.386118 |
30 |
39039626 |
CONST OF CC DRAIN FROM DURGA MANDIR TO ANANDA BAXI HOUSE AT KANKATA |
200000 |
CONST OF CC DRAIN FROM DURGA MANDIR TO ANANDA BAXI HOUSE AT KANKATA1 |
Completion of work |
-
latitude : 23.01780632,23.01780468
Longitude : 86.90549825,86.90549835
file name : Image_25022021113109002.png
|
2021-02-25 11:31:09.071534 |
31 |
34630350 |
INSTALLATION OF TUBE WELL NEAR DUBRAJ PUR LAXMI MELA WITH PLATFORM DRAIN AND SOCK PIT ETC |
80000 |
INSTALLATION OF TUBE WELL NEAR DUBRAJ PUR LAXMI MELA WITH PLATFORM DRAIN AND SOCK PIT ETC1 |
Completion of work |
-
latitude : 23.00321277
Longitude : 86.83488417
file name : Image_27022021105209280.png
|
2021-02-27 10:52:07.93795 |
32 |
34621528 |
CONSTRUCTION OF CEMENT CONCRETE DRAIN FROM SUBHAS MANDAL HOUSE TO MANDAL PUKUR |
300000 |
CONSTRUCTION OF CEMENT CONCRETE DRAIN FROM SUBHAS MANDAL HOUSE TO MANDAL PUKUR1 |
Completion of work |
-
latitude : 23.02482204,23.02482155
Longitude : 86.8491668,86.84916668
file name : Image_25022021160508990.png
|
2021-02-25 16:05:09.042118 |
33 |
34547260 |
INSTALLATION TUBE WELL NEAR DIGJAG BAURI HOUSE AT PRATAP PUR |
80000 |
INSTALLATION TUBE WELL NEAR DIGJAG BAURI HOUSE AT PRATAP PUR1 |
Completion of work |
-
latitude : 23.01815615
Longitude : 86.87023853
file name : Image_19022021132908909.png
|
2021-02-19 13:29:08.977619 |
34 |
34609134 |
CONSTRUCTION OF CEMENT CONCRETE DRAIN KALIMELA TO ASHOKE MUKHERJEE HOUSE |
200000 |
CONSTRUCTION OF CEMENT CONCRETE DRAIN KALIMELA TO ASHOKE MUKHERJEE HOUSE1 |
Completion of work |
-
latitude : 23.02414389,23.02414633
Longitude : 86.85401511,86.85401757
file name : Image_22022021121441081.png
|
2021-02-22 12:14:41.140235 |
35 |
49263599 |
INSTALLATION OF TUBE WELL AT MULBAT BAURI PARA |
90000 |
INSTALLATION OF TUBE WELL AT MULBAT BAURI PARA1 |
Completion of work |
-
latitude : 23.0210887
Longitude : 86.858552
file name : Image_05112021100812136.png
|
2021-11-05 10:08:12.209486 |
36 |
49263599 |
INSTALLATION OF TUBE WELL AT MULBAT BAURI PARA |
90000 |
INSTALLATION OF TUBE WELL AT MULBAT BAURI PARA1 |
Completion of work |
-
latitude : 23.008213333333334
Longitude : 86.89024166666668
file name : Image_01112021203416645.png
|
2021-11-01 20:34:16.719349 |
37 |
49261166 |
INSTALLATION OF TUBE WELL AT SHYAMSUNDAR PUR |
90000 |
INSTALLATION OF TUBE WELL AT SHYAMSUNDAR PUR1 |
Completion of work |
-
latitude : 22.994863333333335
Longitude : 86.87255666666667
file name : Image_03112021153014318.png
|
2021-11-03 15:30:14.397873 |
38 |
49261166 |
INSTALLATION OF TUBE WELL AT SHYAMSUNDAR PUR |
90000 |
INSTALLATION OF TUBE WELL AT SHYAMSUNDAR PUR1 |
Completion of work |
-
latitude : 22.994861666666665
Longitude : 86.87244666666666
file name : Image_03112021153018435.png
|
2021-11-03 15:30:18.515245 |
39 |
34608334 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KALYAN BANERJEE HOUSE TO PURATAN POND AT KUBASOLE |
300000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KALYAN BANERJEE HOUSE TO PURATAN POND AT KUBASOLE1 |
Completion of work |
-
latitude : 23.024835,23.024835
Longitude : 86.85310499999999,86.85310499999999
file name : Image_08102021122001984.png
|
2021-10-08 12:20:02.084993 |
40 |
34608334 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KALYAN BANERJEE HOUSE TO PURATAN POND AT KUBASOLE |
300000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KALYAN BANERJEE HOUSE TO PURATAN POND AT KUBASOLE1 |
Completion of work |
-
latitude : 23.024961666666666,23.024961666666666
Longitude : 86.85316166666668,86.85316166666668
file name : Image_07102021131345284.png
|
2021-10-07 13:13:45.382235 |
41 |
49261550 |
INSTALLATION OF TUBE WELL NEAR PRABIR MODAK HOUSE |
90000 |
INSTALLATION OF TUBE WELL NEAR PRABIR MODAK HOUSE1 |
Completion of work |
-
latitude : 23.01833333333333
Longitude : 86.86095166666668
file name : Image_31102021114511458.png
|
2021-10-31 11:45:11.546092 |
42 |
49261550 |
INSTALLATION OF TUBE WELL NEAR PRABIR MODAK HOUSE |
90000 |
INSTALLATION OF TUBE WELL NEAR PRABIR MODAK HOUSE1 |
Completion of work |
-
latitude : 23.018285
Longitude : 86.86094999999999
file name : Image_01112021203407177.png
|
2021-11-01 20:34:07.260079 |
43 |
34370196 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM BANPUKURIA MAIN PITCH TO GIRLS SCHOOL ROAD |
300000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM BANPUKURIA MAIN PITCH TO GIRLS SCHOOL ROAD1 |
Completion of work |
-
latitude : 23.024173333333337,23.024173333333337
Longitude : 86.86111166666666,86.86111166666666
file name : Image_24092021175127317.png
|
2021-09-24 17:51:27.412099 |
44 |
34370196 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM BANPUKURIA MAIN PITCH TO GIRLS SCHOOL ROAD |
300000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM BANPUKURIA MAIN PITCH TO GIRLS SCHOOL ROAD1 |
Completion of work |
-
latitude : 23.019378333333332,23.019378333333332
Longitude : 86.86196666666667,86.86196666666667
file name : Image_21092021164002003.png
|
2021-09-21 16:40:02.113582 |
45 |
49277705 |
GOALPOST NEAR HANSPATHAR SCHOOL FOOTBAL GROUND |
50000 |
GOALPOST NEAR HANSPATHAR SCHOOL FOOTBAL GROUND1 |
Completion of work |
-
latitude : 23.024458333333335,23.024458333333335
Longitude : 86.88331333333332,86.88331333333332
file name : Image_07102021160143398.png
|
2021-10-07 16:01:43.502986 |
46 |
49277542 |
GOALPOST NEAR BANPUKHURIYA SCHOOL FOOTBAL GROUND |
50000 |
GOALPOST NEAR BANPUKHURIYA SCHOOL FOOTBAL GROUND1 |
Completion of work |
-
latitude : 23.025638333333337,23.025638333333337
Longitude : 86.86140666666667,86.86140666666667
file name : Image_08102021124140545.png
|
2021-10-08 12:41:40.656491 |
47 |
49277542 |
GOALPOST NEAR BANPUKHURIYA SCHOOL FOOTBAL GROUND |
50000 |
GOALPOST NEAR BANPUKHURIYA SCHOOL FOOTBAL GROUND1 |
Completion of work |
-
latitude : 23.02540333333333,23.02537333333333
Longitude : 86.86130833333333,86.86127166666665
file name : Image_08102021124145598.png
|
2021-10-08 12:41:45.69865 |
48 |
49277542 |
GOALPOST NEAR BANPUKHURIYA SCHOOL FOOTBAL GROUND |
50000 |
GOALPOST NEAR BANPUKHURIYA SCHOOL FOOTBAL GROUND1 |
Completion of work |
-
latitude : 23.025011666666668,23.025011666666668
Longitude : 86.86118,86.86118
file name : Image_07102021095920346.png
|
2021-10-07 09:59:20.480775 |
49 |
49270595 |
PURCHASE OF TUBE WELL PARTS FOR DRINKING WATER SUPUR GP AREA AND MECHANIC WAGES |
279413 |
PURCHASE OF TUBE WELL PARTS FOR DRINKING WATER SUPUR GP AREA AND MECHANIC WAGES1 |
Completion of work |
-
latitude : 23.0095099
Longitude : 86.872935
file name : Image_07102021163220375.png
|
2021-10-07 16:32:20.479812 |
50 |
49263792 |
INSTALLATION OF TUBE WELL AT BURISAHAR MANSAMELA |
90000 |
INSTALLATION OF TUBE WELL AT BURISAHAR MANSAMELA1 |
Completion of work |
-
latitude : 22.994699999999998
Longitude : 86.85070833333333
file name : Image_08102021135310423.png
|
2021-10-08 13:53:10.533515 |
51 |
49263792 |
INSTALLATION OF TUBE WELL AT BURISAHAR MANSAMELA |
90000 |
INSTALLATION OF TUBE WELL AT BURISAHAR MANSAMELA1 |
Completion of work |
-
latitude : 22.994755
Longitude : 86.85073499999999
file name : Image_07102021095930547.png
|
2021-10-07 09:59:30.677941 |
52 |
49278684 |
C C ROAD FROM MULBUT PITCH TO HARIMANDIT |
300000 |
C C ROAD FROM MULBUT PITCH TO HARIMANDIT1 |
Completion of work |
-
latitude : 23.012128333333333,23.012128333333333
Longitude : 86.87397166666666,86.87397166666666
file name : Image_08102021135316920.png
|
2021-10-08 13:53:17.021149 |
53 |
49278684 |
C C ROAD FROM MULBUT PITCH TO HARIMANDIT |
300000 |
C C ROAD FROM MULBUT PITCH TO HARIMANDIT1 |
Completion of work |
-
latitude : 23.012035,23.012035,23.012035
Longitude : 86.87415333333333,86.87415333333333,86.87415333333333
file name : Image_07102021074307316.png
|
2021-10-07 07:43:07.415827 |
54 |
49280433 |
C C ROAD FROM PITCH ROAD TO SUPUR HIGH SCHOOL |
300000 |
C C ROAD FROM PITCH ROAD TO SUPUR HIGH SCHOOL1 |
Completion of work |
-
latitude : 23.0210832,23.0210832
Longitude : 86.8585482,86.8585482
file name : Image_08102021120813976.png
|
2021-10-08 12:08:14.083403 |
55 |
49280433 |
C C ROAD FROM PITCH ROAD TO SUPUR HIGH SCHOOL |
300000 |
C C ROAD FROM PITCH ROAD TO SUPUR HIGH SCHOOL1 |
Completion of work |
-
latitude : 23.0217705,23.0217705
Longitude : 86.8585408,86.8585408
file name : Image_07102021095926126.png
|
2021-10-07 09:59:26.247748 |
56 |
49274184 |
construction of community toilet at supur more |
220514 |
construction of community toilet at supur more1 |
Completion of work |
-
latitude : 23.0196928
Longitude : 86.8584642
file name : Image_18022022090853275.png
|
2022-02-18 09:08:53.355123 |
57 |
49277884 |
C C ROAD FROM JAJADIHI VILLAGE TO HANSAPATHAR SCHOOL |
300000 |
C C ROAD FROM JAJADIHI VILLAGE TO HANSAPATHAR SCHOOL1 |
Completion of work |
-
latitude : 23.019401666666667,23.019401666666667
Longitude : 86.87689,86.87689
file name : Image_29032022152252191.png
|
2022-03-29 15:22:52.33498 |
58 |
49277884 |
C C ROAD FROM JAJADIHI VILLAGE TO HANSAPATHAR SCHOOL |
300000 |
C C ROAD FROM JAJADIHI VILLAGE TO HANSAPATHAR SCHOOL1 |
Completion of work |
-
latitude : 23.019401666666667,23.019401666666667
Longitude : 86.87689,86.87689
file name : Image_29032022152147853.png
|
2022-03-29 15:21:48.210889 |
59 |
49277884 |
C C ROAD FROM JAJADIHI VILLAGE TO HANSAPATHAR SCHOOL |
300000 |
C C ROAD FROM JAJADIHI VILLAGE TO HANSAPATHAR SCHOOL1 |
Completion of work |
-
latitude : 23.019401666666667,23.019401666666667
Longitude : 86.87689,86.87689
file name : Image_29032022152138867.png
|
2022-03-29 15:21:43.498677 |
60 |
34559405 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM ICDS CENTRE TO BARABUND AT MIRGIPAHARI |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM ICDS CENTRE TO BARABUND AT MIRGIPAHARI1 |
Completion of work |
-
latitude : 23.03097421,23.03094574
Longitude : 86.88176359,86.88180639
file name : Image_22022021123655592.png
|
2021-02-22 12:36:55.664024 |
61 |
57080280 |
Installation of MII tube well at Dhabarhar village including platform drain etc |
90000 |
Installation of MII tube well at Dhabarhar village including platform drain etc1 |
Completion of work |
-
latitude : 22.98789838
Longitude : 86.85782535
file name : Image_28022023122947466.png
|
2023-02-28 12:29:47.563176 |
62 |
57080280 |
Installation of MII tube well at Dhabarhar village including platform drain etc |
90000 |
Installation of MII tube well at Dhabarhar village including platform drain etc1 |
Completion of work |
-
latitude : 22.98789636
Longitude : 86.85779939
file name : Image_28022023121901416.png
|
2023-02-28 12:19:01.506438 |
63 |
57080280 |
Installation of MII tube well at Dhabarhar village including platform drain etc |
90000 |
Installation of MII tube well at Dhabarhar village including platform drain etc1 |
Completion of work |
-
latitude : 22.98787456
Longitude : 86.85774293
file name : Image_16022023131455128.png
|
2023-02-16 13:14:55.225381 |
64 |
57080280 |
Installation of MII tube well at Dhabarhar village including platform drain etc |
90000 |
Installation of MII tube well at Dhabarhar village including platform drain etc1 |
Completion of work |
-
latitude : 22.98789798
Longitude : 86.85777807
file name : Image_16022023131636773.png
|
2023-02-16 13:16:36.867864 |
65 |
57079765 |
Installation of MII tube well at Baragarh football ground including platform drain etc |
90000 |
Installation of MII tube well at Baragarh football ground including platform drain etc1 |
Completion of work |
-
latitude : 23.00193426
Longitude : 86.86575176
file name : Image_28022023124220677.png
|
2023-02-28 12:42:20.770098 |
66 |
57079765 |
Installation of MII tube well at Baragarh football ground including platform drain etc |
90000 |
Installation of MII tube well at Baragarh football ground including platform drain etc1 |
Completion of work |
-
latitude : 23.00195537
Longitude : 86.86572658
file name : Image_28022023124018639.png
|
2023-02-28 12:40:18.7417 |
67 |
57079765 |
Installation of MII tube well at Baragarh football ground including platform drain etc |
90000 |
Installation of MII tube well at Baragarh football ground including platform drain etc1 |
Completion of work |
-
latitude : 23.00192724
Longitude : 86.86573847
file name : Image_16022023133508086.png
|
2023-02-16 13:35:08.186293 |
68 |
57079765 |
Installation of MII tube well at Baragarh football ground including platform drain etc |
90000 |
Installation of MII tube well at Baragarh football ground including platform drain etc1 |
Completion of work |
-
latitude : 23.00196274
Longitude : 86.8657399
file name : Image_16022023133502186.png
|
2023-02-16 13:35:02.311231 |
69 |
57079765 |
Installation of MII tube well at Baragarh football ground including platform drain etc |
90000 |
Installation of MII tube well at Baragarh football ground including platform drain etc1 |
Completion of work |
-
latitude : 23.00194758
Longitude : 86.86569777
file name : Image_16022023133330624.png
|
2023-02-16 13:33:30.725817 |
70 |
57079765 |
Installation of MII tube well at Baragarh football ground including platform drain etc |
90000 |
Installation of MII tube well at Baragarh football ground including platform drain etc1 |
Completion of work |
-
latitude : 23.00196274
Longitude : 86.8657399
file name : Image_16022023133335137.png
|
2023-02-16 13:33:35.230957 |
71 |
57079765 |
Installation of MII tube well at Baragarh football ground including platform drain etc |
90000 |
Installation of MII tube well at Baragarh football ground including platform drain etc1 |
Completion of work |
-
latitude : 23.00192724
Longitude : 86.86573847
file name : Image_16022023133339698.png
|
2023-02-16 13:33:39.796787 |
72 |
57079765 |
Installation of MII tube well at Baragarh football ground including platform drain etc |
90000 |
Installation of MII tube well at Baragarh football ground including platform drain etc1 |
Completion of work |
-
latitude : 23.00197752
Longitude : 86.86569818
file name : Image_16022023132500422.png
|
2023-02-16 13:25:00.512454 |
73 |
57079290 |
Installation of MII tube well near Jaba kusum Mandal houseBaragarh including platform drain etc |
90000 |
Installation of MII tube well near Jaba kusum Mandal houseBaragarh including platform drain etc1 |
Completion of work |
-
latitude : 23.00269175
Longitude : 86.868216
file name : Image_28022023124837328.png
|
2023-02-28 12:48:37.429398 |
74 |
57079290 |
Installation of MII tube well near Jaba kusum Mandal houseBaragarh including platform drain etc |
90000 |
Installation of MII tube well near Jaba kusum Mandal houseBaragarh including platform drain etc1 |
Completion of work |
-
latitude : 23.00268898
Longitude : 86.86822035
file name : Image_28022023124649494.png
|
2023-02-28 12:46:49.595677 |
75 |
57079290 |
Installation of MII tube well near Jaba kusum Mandal houseBaragarh including platform drain etc |
90000 |
Installation of MII tube well near Jaba kusum Mandal houseBaragarh including platform drain etc1 |
Completion of work |
-
latitude : 23.00270008
Longitude : 86.86819946
file name : Image_16022023133931796.png
|
2023-02-16 13:39:31.893591 |
76 |
57079290 |
Installation of MII tube well near Jaba kusum Mandal houseBaragarh including platform drain etc |
90000 |
Installation of MII tube well near Jaba kusum Mandal houseBaragarh including platform drain etc1 |
Completion of work |
-
latitude : 23.00267419
Longitude : 86.86816019
file name : Image_16022023133800523.png
|
2023-02-16 13:38:00.619612 |
77 |
57070676 |
Installation of MII tube well near Dhibarpara Atchala supur including platform drain |
90000 |
Installation of MII tube well near Dhibarpara Atchala supur including platform drain1 |
Completion of work |
-
latitude : 22.98515747
Longitude : 86.89024486
file name : Image_28022023115123228.png
|
2023-02-28 11:51:23.323912 |
78 |
57070676 |
Installation of MII tube well near Dhibarpara Atchala supur including platform drain |
90000 |
Installation of MII tube well near Dhibarpara Atchala supur including platform drain1 |
Completion of work |
-
latitude : 23.01873174
Longitude : 86.86261632
file name : Image_27022023152207879.png
|
2023-02-27 15:22:08.028118 |
79 |
57070676 |
Installation of MII tube well near Dhibarpara Atchala supur including platform drain |
90000 |
Installation of MII tube well near Dhibarpara Atchala supur including platform drain1 |
Completion of work |
-
latitude : 23.01877938
Longitude : 86.86262041
file name : Image_16022023124147777.png
|
2023-02-16 12:41:47.863669 |
80 |
57070676 |
Installation of MII tube well near Dhibarpara Atchala supur including platform drain |
90000 |
Installation of MII tube well near Dhibarpara Atchala supur including platform drain1 |
Completion of work |
-
latitude : 23.01878348
Longitude : 86.86263199
file name : Image_16022023123606590.png
|
2023-02-16 12:36:06.685861 |
81 |
57080758 |
Installation of MII tube well near Supur duari para ICDS including platform drain etc |
90000 |
Installation of MII tube well near Supur duari para ICDS including platform drain etc1 |
Completion of work |
-
latitude : 23.01792496
Longitude : 86.85953938
file name : Image_28022023115811505.png
|
2023-02-28 11:58:11.597704 |
82 |
57080758 |
Installation of MII tube well near Supur duari para ICDS including platform drain etc |
90000 |
Installation of MII tube well near Supur duari para ICDS including platform drain etc1 |
Completion of work |
-
latitude : 23.01791501
Longitude : 86.85950127
file name : Image_27022023152723747.png
|
2023-02-27 15:27:23.870127 |
83 |
57080758 |
Installation of MII tube well near Supur duari para ICDS including platform drain etc |
90000 |
Installation of MII tube well near Supur duari para ICDS including platform drain etc1 |
Completion of work |
-
latitude : 23.01793291
Longitude : 86.85951991
file name : Image_16022023124814259.png
|
2023-02-16 12:48:14.354521 |
84 |
57080758 |
Installation of MII tube well near Supur duari para ICDS including platform drain etc |
90000 |
Installation of MII tube well near Supur duari para ICDS including platform drain etc1 |
Completion of work |
-
latitude : 23.01791051
Longitude : 86.85951079
file name : Image_16022023124649982.png
|
2023-02-16 12:46:50.127409 |
85 |
57075095 |
Installation of MII tube well near GoutamBauri House at Radhamohan pur including platform drain etc |
90000 |
Installation of MII tube well near GoutamBauri House at Radhamohan pur including platform drain etc1 |
Completion of work |
-
latitude : 22.99585165
Longitude : 86.85282359
file name : Image_28022023121254617.png
|
2023-02-28 12:12:54.707825 |
86 |
57075095 |
Installation of MII tube well near GoutamBauri House at Radhamohan pur including platform drain etc |
90000 |
Installation of MII tube well near GoutamBauri House at Radhamohan pur including platform drain etc1 |
Completion of work |
-
latitude : 22.99585775
Longitude : 86.85277874
file name : Image_28022023120635811.png
|
2023-02-28 12:06:35.902561 |
87 |
57075095 |
Installation of MII tube well near GoutamBauri House at Radhamohan pur including platform drain etc |
90000 |
Installation of MII tube well near GoutamBauri House at Radhamohan pur including platform drain etc1 |
Completion of work |
-
latitude : 22.99588118
Longitude : 86.85283471
file name : Image_16022023130313306.png
|
2023-02-16 13:03:13.384794 |
88 |
57075095 |
Installation of MII tube well near GoutamBauri House at Radhamohan pur including platform drain etc |
90000 |
Installation of MII tube well near GoutamBauri House at Radhamohan pur including platform drain etc1 |
Completion of work |
-
latitude : 22.9958646
Longitude : 86.85284036
file name : Image_16022023130143121.png
|
2023-02-16 13:01:43.210561 |
89 |
57069846 |
Installation of MII tube well near Supur icds rajakpara including platform drain etc |
90000 |
Installation of MII tube well near Supur icds rajakpara including platform drain etc1 |
Completion of work |
-
latitude : 23.02442776
Longitude : 86.89275804
file name : Image_28022023130354472.png
|
2023-02-28 13:03:54.565089 |
90 |
57069846 |
Installation of MII tube well near Supur icds rajakpara including platform drain etc |
90000 |
Installation of MII tube well near Supur icds rajakpara including platform drain etc1 |
Completion of work |
-
latitude : 23.02440592
Longitude : 86.89272983
file name : Image_28022023130206702.png
|
2023-02-28 13:02:06.794219 |
91 |
57069846 |
Installation of MII tube well near Supur icds rajakpara including platform drain etc |
90000 |
Installation of MII tube well near Supur icds rajakpara including platform drain etc1 |
Completion of work |
-
latitude : 23.0250211
Longitude : 86.8933689
file name : Image_17022023135046664.png
|
2023-02-17 13:50:46.766302 |
92 |
57069846 |
Installation of MII tube well near Supur icds rajakpara including platform drain etc |
90000 |
Installation of MII tube well near Supur icds rajakpara including platform drain etc1 |
Completion of work |
-
latitude : 23.02438307
Longitude : 86.89269759
file name : Image_17022023134833410.png
|
2023-02-17 13:48:33.519133 |
93 |
57069846 |
Installation of MII tube well near Supur icds rajakpara including platform drain etc |
90000 |
Installation of MII tube well near Supur icds rajakpara including platform drain etc1 |
Completion of work |
-
latitude : 23.02440703
Longitude : 86.89271849
file name : Image_17022023134836975.png
|
2023-02-17 13:48:37.078406 |
94 |
57069846 |
Installation of MII tube well near Supur icds rajakpara including platform drain etc |
90000 |
Installation of MII tube well near Supur icds rajakpara including platform drain etc1 |
Completion of work |
-
latitude : 23.02441128
Longitude : 86.89267888
file name : Image_17022023134840533.png
|
2023-02-17 13:48:40.63734 |
95 |
57069846 |
Installation of MII tube well near Supur icds rajakpara including platform drain etc |
90000 |
Installation of MII tube well near Supur icds rajakpara including platform drain etc1 |
Completion of work |
-
latitude : 23.02440703
Longitude : 86.89271849
file name : Image_17022023134844083.png
|
2023-02-17 13:48:44.18798 |
96 |
57069846 |
Installation of MII tube well near Supur icds rajakpara including platform drain etc |
90000 |
Installation of MII tube well near Supur icds rajakpara including platform drain etc1 |
Completion of work |
-
latitude : 23.02441128
Longitude : 86.89267888
file name : Image_17022023134847687.png
|
2023-02-17 13:48:47.797418 |
97 |
57071021 |
Installation of MII tube well at Supur High school football ground including platform drain etc |
90000 |
Installation of MII tube well at Supur High school football ground including platform drain etc1 |
Completion of work |
-
latitude : 22.99030505
Longitude : 86.83992825
file name : Image_16032023154341233.png
|
2023-03-16 15:43:41.351782 |
98 |
57071021 |
Installation of MII tube well at Supur High school football ground including platform drain etc |
90000 |
Installation of MII tube well at Supur High school football ground including platform drain etc1 |
Completion of work |
-
latitude : 22.99031129
Longitude : 86.8398587
file name : Image_16032023154347435.png
|
2023-03-16 15:43:47.532555 |
99 |
57071021 |
Installation of MII tube well at Supur High school football ground including platform drain etc |
90000 |
Installation of MII tube well at Supur High school football ground including platform drain etc1 |
Completion of work |
-
latitude : 22.99031129
Longitude : 86.8398587
file name : Image_16032023154353532.png
|
2023-03-16 15:43:53.616233 |
100 |
57071021 |
Installation of MII tube well at Supur High school football ground including platform drain etc |
90000 |
Installation of MII tube well at Supur High school football ground including platform drain etc1 |
Completion of work |
-
latitude : 22.99029918
Longitude : 86.83992984
file name : Image_16032023153846935.png
|
2023-03-16 15:38:47.029711 |
101 |
57071021 |
Installation of MII tube well at Supur High school football ground including platform drain etc |
90000 |
Installation of MII tube well at Supur High school football ground including platform drain etc1 |
Completion of work |
-
latitude : 22.99028214
Longitude : 86.83991243
file name : Image_16032023153850193.png
|
2023-03-16 15:38:50.358867 |
102 |
57071021 |
Installation of MII tube well at Supur High school football ground including platform drain etc |
90000 |
Installation of MII tube well at Supur High school football ground including platform drain etc1 |
Completion of work |
-
latitude : 22.99028214
Longitude : 86.83991243
file name : Image_16032023153855212.png
|
2023-03-16 15:38:55.359877 |
103 |
57071021 |
Installation of MII tube well at Supur High school football ground including platform drain etc |
90000 |
Installation of MII tube well at Supur High school football ground including platform drain etc1 |
Completion of work |
-
latitude : 22.99030269
Longitude : 86.83990796
file name : Image_15032023164959823.png
|
2023-03-15 16:49:59.93336 |
104 |
56704352 |
Drain cleaning Durga mela to chapa pond at Balaram pur |
50000 |
Drain cleaning Durga mela to chapa pond at Balaram pur1 |
Completion of work |
-
latitude : 23.01540084,23.01540412
Longitude : 86.86510517,86.86510228
file name : Image_28112022124640547.png
|
2022-11-28 12:46:40.655135 |
105 |
56704352 |
Drain cleaning Durga mela to chapa pond at Balaram pur |
50000 |
Drain cleaning Durga mela to chapa pond at Balaram pur1 |
Completion of work |
-
latitude : 23.01542193,23.01542193
Longitude : 86.86511279,86.86511279
file name : Image_28112022124547807.png
|
2022-11-28 12:45:47.910085 |
106 |
56704352 |
Drain cleaning Durga mela to chapa pond at Balaram pur |
50000 |
Drain cleaning Durga mela to chapa pond at Balaram pur1 |
Completion of work |
-
latitude : 23.01540737,23.01540739
Longitude : 86.86510165,86.86510168
file name : Image_28112022124512349.png
|
2022-11-28 12:45:12.471665 |
107 |
56704352 |
Drain cleaning Durga mela to chapa pond at Balaram pur |
50000 |
Drain cleaning Durga mela to chapa pond at Balaram pur1 |
Completion of work |
-
latitude : 23.0154051,23.01540499,23.01540509
Longitude : 86.86511963,86.86511962,86.86511941
file name : Image_28112022124414943.png
|
2022-11-28 12:44:15.056388 |
108 |
56705673 |
Purchase of hydraulic Toto car for removal of gurbage |
300000 |
Purchase of hydraulic Toto car for removal of gurbage1 |
Completion of work |
-
latitude : 23.0198895
Longitude : 86.8584827
file name : Image_28112022123729956.png
|
2022-11-28 12:37:30.060919 |
109 |
56705673 |
Purchase of hydraulic Toto car for removal of gurbage |
300000 |
Purchase of hydraulic Toto car for removal of gurbage1 |
Completion of work |
-
latitude : 23.0095265
Longitude : 86.8728676
file name : Image_28112022120523562.png
|
2022-11-28 12:05:23.680661 |
110 |
56705673 |
Purchase of hydraulic Toto car for removal of gurbage |
300000 |
Purchase of hydraulic Toto car for removal of gurbage1 |
Completion of work |
-
latitude : 23.0095265
Longitude : 86.8728735
file name : Image_28112022120108242.png
|
2022-11-28 12:01:08.34947 |
111 |
56705673 |
Purchase of hydraulic Toto car for removal of gurbage |
300000 |
Purchase of hydraulic Toto car for removal of gurbage1 |
Completion of work |
-
latitude : 23.0095263
Longitude : 86.8728701
file name : Image_28112022115921551.png
|
2022-11-28 11:59:21.671925 |
112 |
56727480 |
Construction of community toilet near Raidihi pry school |
277218 |
Construction of community toilet near Raidihi pry school1 |
Plinth level |
-
latitude : 23.0095475
Longitude : 86.872883
file name : Image_17102023113112582.png
|
2023-10-17 11:31:12.681598 |
113 |
56727480 |
Construction of community toilet near Raidihi pry school |
277218 |
Construction of community toilet near Raidihi pry school1 |
Completion of work |
-
latitude : 23.0095185
Longitude : 86.8728529
file name : Image_31032023150701662.png
|
2023-03-31 15:07:01.808223 |
114 |
57078043 |
Installation of MII tube well near Dinabandhu BangalHouseDubrajpur including platform drain etc |
90000 |
Installation of MII tube well near Dinabandhu BangalHouseDubrajpur including platform drain etc1 |
Completion of work |
-
latitude : 22.99482132
Longitude : 86.84115837
file name : Image_14112022141443886.png
|
2022-11-14 14:14:43.983947 |
115 |
57078043 |
Installation of MII tube well near Dinabandhu BangalHouseDubrajpur including platform drain etc |
90000 |
Installation of MII tube well near Dinabandhu BangalHouseDubrajpur including platform drain etc1 |
Completion of work |
-
latitude : 22.99480714
Longitude : 86.84116155
file name : Image_14112022141317380.png
|
2022-11-14 14:13:17.466772 |
116 |
57078043 |
Installation of MII tube well near Dinabandhu BangalHouseDubrajpur including platform drain etc |
90000 |
Installation of MII tube well near Dinabandhu BangalHouseDubrajpur including platform drain etc1 |
Completion of work |
-
latitude : 22.99477103
Longitude : 86.84115956
file name : Image_14112022141233271.png
|
2022-11-14 14:12:33.360252 |
117 |
57071574 |
Installation of MII tube well near chitta das House atsupur new colony including platform drain etc |
90000 |
Installation of MII tube well near chitta das House atsupur new colony including platform drain etc1 |
Completion of work |
-
latitude : 23.02301492
Longitude : 86.85793485
file name : Image_23092022144434277.png
|
2022-09-23 14:44:34.374367 |
118 |
57071574 |
Installation of MII tube well near chitta das House atsupur new colony including platform drain etc |
90000 |
Installation of MII tube well near chitta das House atsupur new colony including platform drain etc1 |
Completion of work |
-
latitude : 23.02301518
Longitude : 86.85791164
file name : Image_23092022144241317.png
|
2022-09-23 14:42:41.409928 |
119 |
57071574 |
Installation of MII tube well near chitta das House atsupur new colony including platform drain etc |
90000 |
Installation of MII tube well near chitta das House atsupur new colony including platform drain etc1 |
Completion of work |
-
latitude : 23.02300437
Longitude : 86.85792173
file name : Image_23092022144323825.png
|
2022-09-23 14:43:23.923361 |
120 |
57024878 |
Installation of MII tube well near SankarMandal shop at muragram school including platform drain etc |
90000 |
Installation of MII tube well near SankarMandal shop at muragram school including platform drain etc1 |
Completion of work |
-
latitude : 22.9978764
Longitude : 86.88549219
file name : Image_26092022111723808.png
|
2022-09-26 11:17:23.904305 |
121 |
57024878 |
Installation of MII tube well near SankarMandal shop at muragram school including platform drain etc |
90000 |
Installation of MII tube well near SankarMandal shop at muragram school including platform drain etc1 |
Completion of work |
-
latitude : 22.99787262
Longitude : 86.88548817
file name : Image_26092022111459216.png
|
2022-09-26 11:14:59.310789 |
122 |
57024878 |
Installation of MII tube well near SankarMandal shop at muragram school including platform drain etc |
90000 |
Installation of MII tube well near SankarMandal shop at muragram school including platform drain etc1 |
Completion of work |
-
latitude : 22.99786714
Longitude : 86.88550388
file name : Image_26092022111401527.png
|
2022-09-26 11:14:01.623271 |
123 |
35293063 |
CONSTRUCTION OF TUBE DRAIN AND SOCK PIT IN GP AREA |
250000 |
CONSTRUCTION OF TUBE DRAIN AND SOCK PIT IN GP AREA1 |
Completion of work |
-
latitude : 23.007525
Longitude : 86.87609666666667
file name : Image_17062022192503241.png
|
2022-06-17 19:25:03.341014 |
124 |
35293063 |
CONSTRUCTION OF TUBE DRAIN AND SOCK PIT IN GP AREA |
250000 |
CONSTRUCTION OF TUBE DRAIN AND SOCK PIT IN GP AREA1 |
Completion of work |
-
latitude : 23.007375000000003
Longitude : 86.87600166666668
file name : Image_10062022155919947.png
|
2022-06-10 15:59:20.071475 |
125 |
39037656 |
CONST OF SUBMURSIBLE AT MULBAT |
339446 |
CONST OF SUBMURSIBLE AT MULBAT1 |
Completion of work |
-
latitude : 23.00692851
Longitude : 86.87620366
file name : Image_26042023114758692.png
|
2023-04-26 11:47:58.856313 |
126 |
39037656 |
CONST OF SUBMURSIBLE AT MULBAT |
339446 |
CONST OF SUBMURSIBLE AT MULBAT1 |
Completion of work |
-
latitude : 23.00695635
Longitude : 86.87619901
file name : Image_25042023122308643.png
|
2023-04-25 12:23:08.75115 |
127 |
39037656 |
CONST OF SUBMURSIBLE AT MULBAT |
339446 |
CONST OF SUBMURSIBLE AT MULBAT1 |
Completion of work |
-
latitude : 23.0068629
Longitude : 86.87617812
file name : Image_30032023130111235.png
|
2023-03-30 13:01:11.345568 |
128 |
39037656 |
CONST OF SUBMURSIBLE AT MULBAT |
339446 |
CONST OF SUBMURSIBLE AT MULBAT1 |
Completion of work |
-
latitude : 23.0068629
Longitude : 86.87617812
file name : Image_30032023130116746.png
|
2023-03-30 13:01:16.853863 |
129 |
57023210 |
Installation of MII tube well near Larakham Atchala including platform draiin etc |
90000 |
Installation of MII tube well near Larakham Atchala including platform draiin etc1 |
Completion of work |
-
latitude : 22.99662456
Longitude : 86.87359423
file name : Image_24092022111918878.png
|
2022-09-24 11:19:18.977052 |
130 |
57023210 |
Installation of MII tube well near Larakham Atchala including platform draiin etc |
90000 |
Installation of MII tube well near Larakham Atchala including platform draiin etc1 |
Completion of work |
-
latitude : 22.99663045
Longitude : 86.87356761
file name : Image_24092022111157071.png
|
2022-09-24 11:11:57.161434 |
131 |
57023210 |
Installation of MII tube well near Larakham Atchala including platform draiin etc |
90000 |
Installation of MII tube well near Larakham Atchala including platform draiin etc1 |
Completion of work |
-
latitude : 22.99665586
Longitude : 86.87359422
file name : Image_24092022111300899.png
|
2022-09-24 11:13:00.990127 |
132 |
56729367 |
Construction of community toilet and repairing at supur bus stand |
99750 |
Construction of community toilet and repairing at supur bus stand1 |
Completion of work |
-
latitude : 23.0205557
Longitude : 86.8587485
file name : Image_13042023173029491.png
|
2023-04-13 17:30:29.593366 |
133 |
56729367 |
Construction of community toilet and repairing at supur bus stand |
99750 |
Construction of community toilet and repairing at supur bus stand1 |
Completion of work |
-
latitude : 23.0204928
Longitude : 86.8587703
file name : Image_06042023163526806.png
|
2023-04-06 16:35:26.901103 |
134 |
56729367 |
Construction of community toilet and repairing at supur bus stand |
99750 |
Construction of community toilet and repairing at supur bus stand1 |
Completion of work |
-
latitude : 23.0204655
Longitude : 86.8587706
file name : Image_31032023142323896.png
|
2023-03-31 14:23:24.024421 |
135 |
57077293 |
Installation of MII tube well near NimaiMahata House at Tantikata including platform drain etc |
90000 |
Installation of MII tube well near NimaiMahata House at Tantikata including platform drain etc1 |
Completion of work |
-
latitude : 23.0217165
Longitude : 86.8586888
file name : Image_13042023171918884.png
|
2023-04-13 17:19:18.964862 |
136 |
57077293 |
Installation of MII tube well near NimaiMahata House at Tantikata including platform drain etc |
90000 |
Installation of MII tube well near NimaiMahata House at Tantikata including platform drain etc1 |
Completion of work |
-
latitude : 22.97342501
Longitude : 86.85963721
file name : Image_06042023163200272.png
|
2023-04-06 16:32:00.365789 |
137 |
57077293 |
Installation of MII tube well near NimaiMahata House at Tantikata including platform drain etc |
90000 |
Installation of MII tube well near NimaiMahata House at Tantikata including platform drain etc1 |
Completion of work |
-
latitude : 23.02190382
Longitude : 86.85894915
file name : Image_31032023140351952.png
|
2023-03-31 14:03:52.064634 |
138 |
57077293 |
Installation of MII tube well near NimaiMahata House at Tantikata including platform drain etc |
90000 |
Installation of MII tube well near NimaiMahata House at Tantikata including platform drain etc1 |
Completion of work |
-
latitude : 23.02191592
Longitude : 86.85892322
file name : Image_31032023140355703.png
|
2023-03-31 14:03:55.813827 |
139 |
57077293 |
Installation of MII tube well near NimaiMahata House at Tantikata including platform drain etc |
90000 |
Installation of MII tube well near NimaiMahata House at Tantikata including platform drain etc1 |
Completion of work |
-
latitude : 23.02191592
Longitude : 86.85892322
file name : Image_31032023140359742.png
|
2023-03-31 14:03:59.859186 |
140 |
56707104 |
Const of cc drain jore tal to sib mandir at kankata for wate water |
300000 |
Const of cc drain jore tal to sib mandir at kankata for wate water 1 |
Completion of work |
-
latitude : 23.0179974,23.0179974,23.0179974
Longitude : 86.906507,86.906507,86.906507
file name : Image_25112022124159461.png
|
2022-11-25 12:41:59.563323 |
141 |
56707104 |
Const of cc drain jore tal to sib mandir at kankata for wate water |
300000 |
Const of cc drain jore tal to sib mandir at kankata for wate water 1 |
Completion of work |
-
latitude : 23.01781388,23.01781388
Longitude : 86.90644564,86.90644564
file name : Image_25112022124204459.png
|
2022-11-25 12:42:04.547896 |
142 |
56707104 |
Const of cc drain jore tal to sib mandir at kankata for wate water |
300000 |
Const of cc drain jore tal to sib mandir at kankata for wate water 1 |
Completion of work |
-
latitude : 23.01781388,23.01781388
Longitude : 86.90644564,86.90644564
file name : Image_25112022124212095.png
|
2022-11-25 12:42:12.189918 |
143 |
56707104 |
Const of cc drain jore tal to sib mandir at kankata for wate water |
300000 |
Const of cc drain jore tal to sib mandir at kankata for wate water 1 |
Completion of work |
-
latitude : 23.0179981,23.0179981
Longitude : 86.9064882,86.9064882
file name : Image_29102022120600947.png
|
2022-10-29 12:06:01.05051 |
144 |
56707104 |
Const of cc drain jore tal to sib mandir at kankata for wate water |
300000 |
Const of cc drain jore tal to sib mandir at kankata for wate water 1 |
Completion of work |
-
latitude : 23.01781047,23.0178105
Longitude : 86.90642035,86.90642035
file name : Image_29102022120507428.png
|
2022-10-29 12:05:07.554873 |
145 |
57072722 |
Installation of MII tube well near Arun sardar house atJaltore including platform drain etc |
90000 |
Installation of MII tube well near Arun sardar house atJaltore including platform drain etc1 |
Completion of work |
-
latitude : 23.02459667
Longitude : 86.84807968
file name : Image_23092022125440581.png
|
2022-09-23 12:54:40.68309 |
146 |
57072722 |
Installation of MII tube well near Arun sardar house atJaltore including platform drain etc |
90000 |
Installation of MII tube well near Arun sardar house atJaltore including platform drain etc1 |
Completion of work |
-
latitude : 23.02457957
Longitude : 86.84806974
file name : Image_23092022125357288.png
|
2022-09-23 12:53:57.388957 |
147 |
57072722 |
Installation of MII tube well near Arun sardar house atJaltore including platform drain etc |
90000 |
Installation of MII tube well near Arun sardar house atJaltore including platform drain etc1 |
Completion of work |
-
latitude : 23.02457622
Longitude : 86.84806342
file name : Image_23092022125237955.png
|
2022-09-23 12:52:38.061998 |
148 |
57074627 |
Installation of MII tube well near Maklara Sibmandir including platform drain etc |
90000 |
Installation of MII tube well near Maklara Sibmandir including platform drain etc1 |
Completion of work |
-
latitude : 23.00292761
Longitude : 86.850959
file name : Image_23092022122048169.png
|
2022-09-23 12:20:48.292073 |
149 |
57074627 |
Installation of MII tube well near Maklara Sibmandir including platform drain etc |
90000 |
Installation of MII tube well near Maklara Sibmandir including platform drain etc1 |
Completion of work |
-
latitude : 23.00292922
Longitude : 86.85095302
file name : Image_23092022121713971.png
|
2022-09-23 12:17:14.068874 |
150 |
57074627 |
Installation of MII tube well near Maklara Sibmandir including platform drain etc |
90000 |
Installation of MII tube well near Maklara Sibmandir including platform drain etc1 |
Completion of work |
-
latitude : 23.00293124
Longitude : 86.85094664
file name : Image_23092022121622768.png
|
2022-09-23 12:16:22.871286 |
151 |
57090231 |
Purchase of Tube well spairparts to maintain tube well in GParea |
500000 |
Purchase of Tube well spairparts to maintain tube well in GParea1 |
Completion of work |
-
latitude : 23.0095389
Longitude : 86.8728778
file name : Image_21082022114417246.png
|
2022-08-21 11:44:17.342298 |
152 |
57090231 |
Purchase of Tube well spairparts to maintain tube well in GParea |
500000 |
Purchase of Tube well spairparts to maintain tube well in GParea1 |
Completion of work |
-
latitude : 23.009532
Longitude : 86.8728885
file name : Image_21082022114226936.png
|
2022-08-21 11:42:27.036878 |
153 |
57090231 |
Purchase of Tube well spairparts to maintain tube well in GParea |
500000 |
Purchase of Tube well spairparts to maintain tube well in GParea1 |
Completion of work |
-
latitude : 23.0095331
Longitude : 86.8728851
file name : Image_21082022112856860.png
|
2022-08-21 11:28:56.955444 |
154 |
57073275 |
Installation of MII tube well near jaba kusum Gorai Bhangahar including platform drain etc |
90000 |
Installation of MII tube well near jaba kusum Gorai Bhangahar including platform drain etc1 |
Completion of work |
-
latitude : 23.01273372
Longitude : 86.8841825
file name : Image_15092022172532978.png
|
2022-09-15 17:25:33.056365 |
155 |
57073275 |
Installation of MII tube well near jaba kusum Gorai Bhangahar including platform drain etc |
90000 |
Installation of MII tube well near jaba kusum Gorai Bhangahar including platform drain etc1 |
Completion of work |
-
latitude : 23.01276105
Longitude : 86.88421612
file name : Image_15092022172414839.png
|
2022-09-15 17:24:14.920306 |
156 |
57073275 |
Installation of MII tube well near jaba kusum Gorai Bhangahar including platform drain etc |
90000 |
Installation of MII tube well near jaba kusum Gorai Bhangahar including platform drain etc1 |
Completion of work |
-
latitude : 23.01271699
Longitude : 86.88431682
file name : Image_15092022171546457.png
|
2022-09-15 17:15:46.540647 |
157 |
57078601 |
Installation of MII tube well near BijliSaini house including platform drain etc |
90000 |
Installation of MII tube well near BijliSaini house including platform drain etc1 |
Completion of work |
-
latitude : 23.01314253
Longitude : 86.87552727
file name : Image_16092022122818273.png
|
2022-09-16 12:28:18.358324 |
158 |
57078601 |
Installation of MII tube well near BijliSaini house including platform drain etc |
90000 |
Installation of MII tube well near BijliSaini house including platform drain etc1 |
Completion of work |
-
latitude : 23.01317167
Longitude : 86.8755337
file name : Image_16092022121953719.png
|
2022-09-16 12:19:53.805381 |
159 |
57078601 |
Installation of MII tube well near BijliSaini house including platform drain etc |
90000 |
Installation of MII tube well near BijliSaini house including platform drain etc1 |
Completion of work |
-
latitude : 23.0131819
Longitude : 86.87553277
file name : Image_16092022122009640.png
|
2022-09-16 12:20:09.722171 |
160 |
57078601 |
Installation of MII tube well near BijliSaini house including platform drain etc |
90000 |
Installation of MII tube well near BijliSaini house including platform drain etc1 |
Completion of work |
-
latitude : 23.01319806
Longitude : 86.8754831
file name : Image_15092022174053197.png
|
2022-09-15 17:40:53.301267 |
161 |
57070217 |
Installation of MII tube well near Uday Pramanik supur including platform drain |
90000 |
Installation of MII tube well near Uday Pramanik supur including platform drain1 |
Completion of work |
-
latitude : 23.016078333333333
Longitude : 86.86604166666666
file name : Image_15072022174529987.png
|
2022-07-15 17:45:30.101319 |
162 |
57070217 |
Installation of MII tube well near Uday Pramanik supur including platform drain |
90000 |
Installation of MII tube well near Uday Pramanik supur including platform drain1 |
Completion of work |
-
latitude : 23.016078333333333
Longitude : 86.86604166666666
file name : Image_15072022174524643.png
|
2022-07-15 17:45:24.741656 |
163 |
56704793 |
Drain cleaning Kalyan Banerjee house to kubasole and Bhangahar Gorai Para |
50000 |
Drain cleaning Kalyan Banerjee house to kubasole and Bhangahar Gorai Para1 |
Completion of work |
-
latitude : 23.015634999999996,23.015634999999996
Longitude : 86.865435,86.865435
file name : Image_09062022143216485.png
|
2022-06-09 14:32:16.578959 |
164 |
56704793 |
Drain cleaning Kalyan Banerjee house to kubasole and Bhangahar Gorai Para |
50000 |
Drain cleaning Kalyan Banerjee house to kubasole and Bhangahar Gorai Para1 |
Completion of work |
-
latitude : 23.024013333333333,23.024013333333333
Longitude : 86.85279166666666,86.85279166666666
file name : Image_09062022142624530.png
|
2022-06-09 14:26:24.628287 |
165 |
56704793 |
Drain cleaning Kalyan Banerjee house to kubasole and Bhangahar Gorai Para |
50000 |
Drain cleaning Kalyan Banerjee house to kubasole and Bhangahar Gorai Para1 |
Completion of work |
-
latitude : 23.024013333333333,23.024013333333333
Longitude : 86.85279166666666,86.85279166666666
file name : Image_09062022141337378.png
|
2022-06-09 14:13:37.457339 |
166 |
57025718 |
Installation of MII tube well near Indkocha Asik Khan house including platform draiin etc |
90000 |
Installation of MII tube well near Indkocha Asik Khan house including platform draiin etc1 |
Completion of work |
-
latitude : 22.987061666666666
Longitude : 86.88966
file name : Image_25062022125221240.png
|
2022-06-25 12:52:21.3462 |
167 |
57025718 |
Installation of MII tube well near Indkocha Asik Khan house including platform draiin etc |
90000 |
Installation of MII tube well near Indkocha Asik Khan house including platform draiin etc1 |
Completion of work |
-
latitude : 22.987019999999998
Longitude : 86.88969
file name : Image_21062022085508199.png
|
2022-06-21 08:55:08.304637 |
168 |
57025718 |
Installation of MII tube well near Indkocha Asik Khan house including platform draiin etc |
90000 |
Installation of MII tube well near Indkocha Asik Khan house including platform draiin etc1 |
Completion of work |
-
latitude : 22.987019999999998
Longitude : 86.88969
file name : Image_21062022090742662.png
|
2022-06-21 09:07:42.736438 |
169 |
56705276 |
Dustbin cleaning from kharban more |
50000 |
Dustbin cleaning from kharban more1 |
Completion of work |
-
latitude : 22.9870143
Longitude : 86.8514734
file name : Image_09062022140755427.png
|
2022-06-09 14:07:55.515238 |
170 |
56705276 |
Dustbin cleaning from kharban more |
50000 |
Dustbin cleaning from kharban more1 |
Completion of work |
-
latitude : 22.98785833333333
Longitude : 86.85138333333335
file name : Image_09062022140149872.png
|
2022-06-09 14:01:49.95892 |
171 |
74950180 |
Creation of drainage channel for management of grey water |
339021 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.00949112
Longitude : 86.87280732
file name : Image_02022024155715400.png
|
2024-02-02 15:57:15.498344 |
172 |
74950180 |
Creation of drainage channel for management of grey water |
339021 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.99667524
Longitude : 86.83610093
file name : Image_18012024133702995.png
|
2024-01-18 13:37:03.091143 |
173 |
74950180 |
Creation of drainage channel for management of grey water |
339021 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.99714156
Longitude : 86.83666237
file name : Image_12052023114954170.png
|
2023-05-12 11:49:54.267761 |
174 |
49279606 |
C C ROAD FROM ROAD LARAKHAM MEAN TO GANESH BAURI PHAGE TWO |
300000 |
C C ROAD FROM ROAD LARAKHAM MEAN TO GANESH BAURI PHAGE TWO1 |
Completion of work |
-
latitude : 22.99547,22.99547
Longitude : 86.87362666666668,86.87362666666668
file name : Image_28062022151114847.png
|
2022-06-28 15:11:14.951491 |
175 |
49279606 |
C C ROAD FROM ROAD LARAKHAM MEAN TO GANESH BAURI PHAGE TWO |
300000 |
C C ROAD FROM ROAD LARAKHAM MEAN TO GANESH BAURI PHAGE TWO1 |
Completion of work |
-
latitude : 22.99547,22.99547
Longitude : 86.87362666666668,86.87362666666668
file name : Image_28062022151030393.png
|
2022-06-28 15:10:30.492091 |
176 |
49279606 |
C C ROAD FROM ROAD LARAKHAM MEAN TO GANESH BAURI PHAGE TWO |
300000 |
C C ROAD FROM ROAD LARAKHAM MEAN TO GANESH BAURI PHAGE TWO1 |
Completion of work |
-
latitude : 22.995606666666664,22.995606666666664
Longitude : 86.87361333333335,86.87361333333335
file name : Image_28062022150805789.png
|
2022-06-28 15:08:05.882275 |
177 |
49275319 |
CONSTRUCTION OF DRAINAGE OF WATER TANK AT MULBAT |
50000 |
CONSTRUCTION OF DRAINAGE OF WATER TANK AT MULBAT1 |
Completion of work |
-
latitude : 23.006723333333337,23.006723333333337
Longitude : 86.87772000000001,86.87772000000001
file name : Image_31102021114314015.png
|
2021-10-31 11:43:14.135302 |
178 |
49275319 |
CONSTRUCTION OF DRAINAGE OF WATER TANK AT MULBAT |
50000 |
CONSTRUCTION OF DRAINAGE OF WATER TANK AT MULBAT1 |
Completion of work |
-
latitude : 23.006686666666663,23.006686666666663
Longitude : 86.87782333333334,86.87782333333334
file name : Image_07102021095915508.png
|
2021-10-07 09:59:15.652956 |
179 |
49269574 |
INSTALLATION OF TUBE WELL AT KUCHIYARA MORE |
90000 |
INSTALLATION OF TUBE WELL AT KUCHIYARA MORE 1 |
Completion of work |
-
latitude : 23.02556666666667
Longitude : 86.86185333333333
file name : Image_23032022141740092.png
|
2022-03-23 14:17:40.18311 |
180 |
49269574 |
INSTALLATION OF TUBE WELL AT KUCHIYARA MORE |
90000 |
INSTALLATION OF TUBE WELL AT KUCHIYARA MORE 1 |
Completion of work |
-
latitude : 23.02556666666667
Longitude : 86.86185333333333
file name : Image_23032022141637141.png
|
2022-03-23 14:16:37.230177 |
181 |
49269574 |
INSTALLATION OF TUBE WELL AT KUCHIYARA MORE |
90000 |
INSTALLATION OF TUBE WELL AT KUCHIYARA MORE 1 |
Completion of work |
-
latitude : 23.025489999999998
Longitude : 86.86183666666666
file name : Image_23032022141456609.png
|
2022-03-23 14:14:56.722169 |
182 |
49272270 |
CONSTRUCTION OF WATER TANK NEAR KANKATA DURGA MANDIR |
150000 |
CONSTRUCTION OF WATER TANK NEAR KANKATA DURGA MANDIR1 |
Completion of work |
-
latitude : 23.018414999999997
Longitude : 86.90662499999999
file name : Image_01062022074122342.png
|
2022-06-01 07:41:22.439087 |
183 |
49272270 |
CONSTRUCTION OF WATER TANK NEAR KANKATA DURGA MANDIR |
150000 |
CONSTRUCTION OF WATER TANK NEAR KANKATA DURGA MANDIR1 |
Completion of work |
-
latitude : 23.018414999999997
Longitude : 86.90662499999999
file name : Image_02062022132407745.png
|
2022-06-02 13:24:07.849252 |
184 |
49278988 |
C C OF BATHING GHAT AT BURAR BANDH INCLUDING DRESS CHANGE ROOM |
150000 |
C C OF BATHING GHAT AT BURAR BANDH INCLUDING DRESS CHANGE ROOM1 |
Completion of work |
-
latitude : 23.015079999999998
Longitude : 86.86061333333333
file name : Image_08042022132054568.png
|
2022-04-08 13:20:54.664654 |
185 |
49280722 |
C C OF BATHING GHAT AT SAHER PUKHUR INCLUING DRESS CHANGE ROOM |
150000 |
C C OF BATHING GHAT AT SAHER PUKHUR INCLUING DRESS CHANGE ROOM1 |
Completion of work |
-
latitude : 23.01297833333333
Longitude : 86.86237833333334
file name : Image_02042022095124583.png
|
2022-04-02 09:51:24.705277 |
186 |
49259294 |
INSTALATION OF TUBE WELL AT SUPUR RAJAK PARA AMMTALA INCL PLATFORM DRAIN SOCK PIT |
90000 |
INSTALATION OF TUBE WELL AT SUPUR RAJAK PARA AMMTALA INCL PLATFORM DRAIN SOCK PIT1 |
Completion of work |
-
latitude : 23.017791666666668
Longitude : 86.86415000000001
file name : Image_23032022140818206.png
|
2022-03-23 14:08:18.293774 |
187 |
49259294 |
INSTALATION OF TUBE WELL AT SUPUR RAJAK PARA AMMTALA INCL PLATFORM DRAIN SOCK PIT |
90000 |
INSTALATION OF TUBE WELL AT SUPUR RAJAK PARA AMMTALA INCL PLATFORM DRAIN SOCK PIT1 |
Completion of work |
-
latitude : 23.01779333333333
Longitude : 86.86417166666666
file name : Image_23032022140724904.png
|
2022-03-23 14:07:25.013017 |
188 |
49259294 |
INSTALATION OF TUBE WELL AT SUPUR RAJAK PARA AMMTALA INCL PLATFORM DRAIN SOCK PIT |
90000 |
INSTALATION OF TUBE WELL AT SUPUR RAJAK PARA AMMTALA INCL PLATFORM DRAIN SOCK PIT1 |
Completion of work |
-
latitude : 23.017768333333333
Longitude : 86.86399666666667
file name : Image_23032022140252165.png
|
2022-03-23 14:02:52.254657 |
189 |
49278824 |
C C ROAD FROM BHRAMAR BAURI HOSE TO DOMBAID |
300000 |
C C ROAD FROM BHRAMAR BAURI HOSE TO DOMBAID1 |
Completion of work |
-
latitude : 23.017386666666667,23.017386666666667
Longitude : 86.86863999999998,86.86863999999998
file name : Image_20042022082109188.png
|
2022-04-20 08:21:09.28594 |
190 |
49278824 |
C C ROAD FROM BHRAMAR BAURI HOSE TO DOMBAID |
300000 |
C C ROAD FROM BHRAMAR BAURI HOSE TO DOMBAID1 |
Completion of work |
-
latitude : 23.017384999999997,23.017384999999997
Longitude : 86.86859166666666,86.86859166666666
file name : Image_25032022115948703.png
|
2022-03-25 11:59:48.813229 |
191 |
49280581 |
C C ROAD SUPUR HIGH SCHOOL PRANGAN INCLUDING FLOWER GARDEN |
200000 |
C C ROAD SUPUR HIGH SCHOOL PRANGAN INCLUDING FLOWER GARDEN1 |
Completion of work |
-
latitude : 23.0211238,23.0211238
Longitude : 86.8586178,86.8586178
file name : Image_20042022074502499.png
|
2022-04-20 07:45:02.602596 |
192 |
49280581 |
C C ROAD SUPUR HIGH SCHOOL PRANGAN INCLUDING FLOWER GARDEN |
200000 |
C C ROAD SUPUR HIGH SCHOOL PRANGAN INCLUDING FLOWER GARDEN1 |
Completion of work |
-
latitude : 23.020205,23.020205
Longitude : 86.85857833333333,86.85857833333333
file name : Image_08042022132101644.png
|
2022-04-08 13:21:01.752813 |
193 |
49273354 |
construction of water tank at muragram high school |
150000 |
construction of water tank at muragram high school1 |
Completion of work |
-
latitude : 22.98968
Longitude : 86.88183333333333
file name : Image_28062022144536703.png
|
2022-06-28 14:45:36.804401 |
194 |
49273354 |
construction of water tank at muragram high school |
150000 |
construction of water tank at muragram high school1 |
Completion of work |
-
latitude : 22.989571666666667
Longitude : 86.88183666666667
file name : Image_21062022090757041.png
|
2022-06-21 09:07:57.136442 |
195 |
49273354 |
construction of water tank at muragram high school |
150000 |
construction of water tank at muragram high school1 |
Completion of work |
-
latitude : 22.98950333333333
Longitude : 86.88187
file name : Image_09062022115425740.png
|
2022-06-09 11:54:25.852615 |
196 |
49279290 |
C C OF C C ROAD FROM BOXIDIHI MAIN ROAD TO PRY SCHOOL |
300000 |
C C OF C C ROAD FROM BOXIDIHI MAIN ROAD TO PRY SCHOOL1 |
Completion of work |
-
latitude : 22.99068333333333,22.99068333333333
Longitude : 86.873045,86.873045
file name : Image_30042022102912906.png
|
2022-04-30 10:29:13.029087 |
197 |
49279290 |
C C OF C C ROAD FROM BOXIDIHI MAIN ROAD TO PRY SCHOOL |
300000 |
C C OF C C ROAD FROM BOXIDIHI MAIN ROAD TO PRY SCHOOL1 |
Completion of work |
-
latitude : 22.99066833333333,22.99066833333333,22.99066833333333
Longitude : 86.87299999999999,86.87299999999999,86.87299999999999
file name : Image_18042022123515208.png
|
2022-04-18 12:35:15.321397 |
198 |
49279856 |
CC ROAD SUPUR POST OFFICE TO BIKRAM DAS HOUSE |
300000 |
CC ROAD SUPUR POST OFFICE TO BIKRAM DAS HOUSE1 |
Completion of work |
-
latitude : 23.022798333333338,23.022798333333338
Longitude : 86.85335500000001,86.85335500000001
file name : Image_20042022080443241.png
|
2022-04-20 08:04:43.349613 |
199 |
49280088 |
C C ROAD AT MADHUPUR VILLAGE |
300000 |
C C ROAD AT MADHUPUR VILLAGE1 |
Completion of work |
-
latitude : 23.002149999999997,23.002149999999997
Longitude : 86.83753666666668,86.83753666666668
file name : Image_21042022130636043.png
|
2022-04-21 13:06:36.139175 |
200 |
49280088 |
C C ROAD AT MADHUPUR VILLAGE |
300000 |
C C ROAD AT MADHUPUR VILLAGE1 |
Completion of work |
-
latitude : 23.002131666666667,23.002131666666667
Longitude : 86.83751666666667,86.83751666666667
file name : Image_21042022124810985.png
|
2022-04-21 12:48:11.116777 |
201 |
49280088 |
C C ROAD AT MADHUPUR VILLAGE |
300000 |
C C ROAD AT MADHUPUR VILLAGE1 |
Completion of work |
-
latitude : 23.002485,23.002485,23.002485,23.002485
Longitude : 86.83774166666666,86.83774166666666,86.83774166666666,86.83774166666666
file name : Image_08042022132108024.png
|
2022-04-08 13:21:08.12789 |
202 |
49278059 |
C C DRAEN FROM CHHUCHI BAGLI TO KHANNA |
300000 |
C C DRAEN FROM CHHUCHI BAGLI TO KHANNA1 |
Completion of work |
-
latitude : 23.014001666666665
Longitude : 86.877075
file name : Image_02052022123351207.png
|
2022-05-02 12:33:51.329124 |
203 |
49278059 |
C C DRAEN FROM CHHUCHI BAGLI TO KHANNA |
300000 |
C C DRAEN FROM CHHUCHI BAGLI TO KHANNA1 |
Completion of work |
-
latitude : 23.014033333333334
Longitude : 86.87701833333334
file name : Image_18042022130814866.png
|
2022-04-18 13:08:14.997792 |
204 |
49269938 |
INSTALLATION OF TUBE WELL AT MADHUPUR INCLUDING PLATFORM DRAIN SOCK PIT ETC ONE |
90000 |
INSTALLATION OF TUBE WELL AT MADHUPUR INCLUDING PLATFORM DRAIN SOCK PIT ETC ONE1 |
Completion of work |
-
latitude : 23.008470000000003
Longitude : 86.84790999999998
file name : Image_21042022133652955.png
|
2022-04-21 13:36:53.053537 |
205 |
49269938 |
INSTALLATION OF TUBE WELL AT MADHUPUR INCLUDING PLATFORM DRAIN SOCK PIT ETC ONE |
90000 |
INSTALLATION OF TUBE WELL AT MADHUPUR INCLUDING PLATFORM DRAIN SOCK PIT ETC ONE1 |
Completion of work |
-
latitude : 23.005003333333335
Longitude : 86.84055833333332
file name : Image_21042022132920849.png
|
2022-04-21 13:29:20.950155 |
206 |
49260187 |
installation of vkrishnapad abauri house incl platform drain and sockpit |
90000 |
installation of vkrishnapad abauri house incl platform drain and sockpit1 |
Completion of work |
-
latitude : 23.000375000000002
Longitude : 86.86523666666666
file name : Image_13042022132139457.png
|
2022-04-13 13:21:39.565885 |
207 |
49270110 |
INSTALLATION OF BTUBE WELL AT RADHAMOHAN PUR INCLUDING PLATFORM DRAIN SOCK PIT ETC |
90000 |
INSTALLATION OF BTUBE WELL AT RADHAMOHAN PUR INCLUDING PLATFORM DRAIN SOCK PIT ETC1 |
Completion of work |
-
latitude : 23.00704166666667
Longitude : 86.84055000000002
file name : Image_21042022131331023.png
|
2022-04-21 13:13:31.110383 |
208 |
49270110 |
INSTALLATION OF BTUBE WELL AT RADHAMOHAN PUR INCLUDING PLATFORM DRAIN SOCK PIT ETC |
90000 |
INSTALLATION OF BTUBE WELL AT RADHAMOHAN PUR INCLUDING PLATFORM DRAIN SOCK PIT ETC1 |
Completion of work |
-
latitude : 23.007003333333333
Longitude : 86.84060166666669
file name : Image_21042022131007432.png
|
2022-04-21 13:10:07.555951 |
209 |
49270110 |
INSTALLATION OF BTUBE WELL AT RADHAMOHAN PUR INCLUDING PLATFORM DRAIN SOCK PIT ETC |
90000 |
INSTALLATION OF BTUBE WELL AT RADHAMOHAN PUR INCLUDING PLATFORM DRAIN SOCK PIT ETC1 |
Completion of work |
-
latitude : 23.007003333333333
Longitude : 86.84060166666669
file name : Image_21042022130801069.png
|
2022-04-21 13:08:01.151372 |
210 |
49283531 |
WATER TANK AT SUPUR GP OFFICE |
1451100 |
WATER TANK AT SUPUR GP OFFICE1 |
Completion of work |
-
latitude : 23.0095019
Longitude : 86.8728999
file name : Image_24052022162651803.png
|
2022-05-24 16:26:51.90023 |
211 |
49283531 |
WATER TANK AT SUPUR GP OFFICE |
1451100 |
WATER TANK AT SUPUR GP OFFICE1 |
Completion of work |
-
latitude : 23.0095052
Longitude : 86.8729002
file name : Image_24052022162657898.png
|
2022-05-24 16:26:58.00336 |
212 |
49258598 |
INSTALATION OF TUBE WELL AT PRATAP PUR SISU SIKSKA KENDRA INCLUDINNG PLATFORM DRAIN TS |
90000 |
INSTALATION OF TUBE WELL AT PRATAP PUR SISU SIKSKA KENDRA INCLUDINNG PLATFORM DRAIN TS1 |
Completion of work |
-
latitude : 23.01498094
Longitude : 86.86453702
file name : Image_13042023170304366.png
|
2023-04-13 17:03:04.457947 |
213 |
49258598 |
INSTALATION OF TUBE WELL AT PRATAP PUR SISU SIKSKA KENDRA INCLUDINNG PLATFORM DRAIN TS |
90000 |
INSTALATION OF TUBE WELL AT PRATAP PUR SISU SIKSKA KENDRA INCLUDINNG PLATFORM DRAIN TS1 |
Completion of work |
-
latitude : 23.0150371
Longitude : 86.8644942
file name : Image_06042023163901836.png
|
2023-04-06 16:39:01.98207 |
214 |
49258598 |
INSTALATION OF TUBE WELL AT PRATAP PUR SISU SIKSKA KENDRA INCLUDINNG PLATFORM DRAIN TS |
90000 |
INSTALATION OF TUBE WELL AT PRATAP PUR SISU SIKSKA KENDRA INCLUDINNG PLATFORM DRAIN TS1 |
Completion of work |
-
latitude : 23.01497654
Longitude : 86.86447745
file name : Image_31032023144930578.png
|
2023-03-31 14:49:30.688785 |
215 |
49258919 |
INSTALATION OF TUBEWELL NEAR SUDHARANI KISKUN HOUSE INCL DRAN SOCK PIT PLATFORM ETC |
90000 |
INSTALATION OF TUBEWELL NEAR SUDHARANI KISKUN HOUSE INCL DRAN SOCK PIT PLATFORM ETC1 |
Completion of work |
-
latitude : 23.01191805
Longitude : 86.87568601
file name : Image_13042023174212741.png
|
2023-04-13 17:42:12.871493 |
216 |
49258919 |
INSTALATION OF TUBEWELL NEAR SUDHARANI KISKUN HOUSE INCL DRAN SOCK PIT PLATFORM ETC |
90000 |
INSTALATION OF TUBEWELL NEAR SUDHARANI KISKUN HOUSE INCL DRAN SOCK PIT PLATFORM ETC1 |
Completion of work |
-
latitude : 23.01188209
Longitude : 86.87575699
file name : Image_10042023120317491.png
|
2023-04-10 12:03:17.578862 |
217 |
49258919 |
INSTALATION OF TUBEWELL NEAR SUDHARANI KISKUN HOUSE INCL DRAN SOCK PIT PLATFORM ETC |
90000 |
INSTALATION OF TUBEWELL NEAR SUDHARANI KISKUN HOUSE INCL DRAN SOCK PIT PLATFORM ETC1 |
Completion of work |
-
latitude : 23.01188526
Longitude : 86.87576573
file name : Image_31032023145854809.png
|
2023-03-31 14:58:54.967214 |
218 |
49258360 |
INSTALATION OF TUBE WELL NEARV TAPAN DHIBAR HOUSE INCLUDING PLATFORM DRAIN SOCK PIT ETC |
90000 |
INSTALATION OF TUBE WELL NEARV TAPAN DHIBAR HOUSE INCLUDING PLATFORM DRAIN SOCK PIT ETC1 |
Completion of work |
-
latitude : 22.9923104
Longitude : 86.88103852
file name : Image_31032023181114959.png
|
2023-03-31 18:11:15.050632 |
219 |
49258360 |
INSTALATION OF TUBE WELL NEARV TAPAN DHIBAR HOUSE INCLUDING PLATFORM DRAIN SOCK PIT ETC |
90000 |
INSTALATION OF TUBE WELL NEARV TAPAN DHIBAR HOUSE INCLUDING PLATFORM DRAIN SOCK PIT ETC1 |
Completion of work |
-
latitude : 22.9922294
Longitude : 86.88095482
file name : Image_05042023114835922.png
|
2023-04-05 11:48:36.013835 |
220 |
49275096 |
CONSTRUCTION OF ROAD SIDE TUBE WELL DRAIN FROM SUPUR MORE TO BANPUKURIA |
339021 |
CONSTRUCTION OF ROAD SIDE TUBE WELL DRAIN FROM SUPUR MORE TO BANPUKURIA1 |
Completion of work |
-
latitude : 22.99706048,22.99705936
Longitude : 86.83664648,86.83664511
file name : Image_30032023143516606.png
|
2023-03-30 14:35:16.710079 |
221 |
57028264 |
Installation of MII tube well near Dharrmouli majh para Atchala |
90000 |
Installation of MII tube well near Dharrmouli majh para Atchala1 |
Completion of work |
-
latitude : 23.024563333333337
Longitude : 86.90022499999999
file name : Image_22062022113442767.png
|
2022-06-22 11:34:42.893637 |
222 |
57028264 |
Installation of MII tube well near Dharrmouli majh para Atchala |
90000 |
Installation of MII tube well near Dharrmouli majh para Atchala1 |
Completion of work |
-
latitude : 23.024504999999998
Longitude : 86.90027833333333
file name : Image_22062022125243501.png
|
2022-06-22 12:52:43.603238 |
223 |
57026291 |
Installation of MII tube well near Kankata Sibmandir including platform drain etc |
90000 |
Installation of MII tube well near Kankata Sibmandir including platform drain etc1 |
Completion of work |
-
latitude : 23.013995
Longitude : 86.905975
file name : Image_22062022125249602.png
|
2022-06-22 12:52:49.708158 |
224 |
57026291 |
Installation of MII tube well near Kankata Sibmandir including platform drain etc |
90000 |
Installation of MII tube well near Kankata Sibmandir including platform drain etc1 |
Completion of work |
-
latitude : 23.014090000000003
Longitude : 86.90601333333333
file name : Image_22062022125253964.png
|
2022-06-22 12:52:54.06801 |
225 |
34623197 |
CONSTRUCTION OF BATHING GHAT AT ASIT BAURI POND AT MURAGRAM |
150000 |
CONSTRUCTION OF BATHING GHAT AT ASIT BAURI POND AT MURAGRAM1 |
Completion of work |
-
latitude : 22.990768333333335
Longitude : 86.879695
file name : Image_17032022172640801.png
|
2022-03-17 17:26:40.885583 |
226 |
34623197 |
CONSTRUCTION OF BATHING GHAT AT ASIT BAURI POND AT MURAGRAM |
150000 |
CONSTRUCTION OF BATHING GHAT AT ASIT BAURI POND AT MURAGRAM1 |
Completion of work |
-
latitude : 22.990811666666666
Longitude : 86.87975
file name : Image_17032022172158620.png
|
2022-03-17 17:21:58.702877 |
227 |
34623197 |
CONSTRUCTION OF BATHING GHAT AT ASIT BAURI POND AT MURAGRAM |
150000 |
CONSTRUCTION OF BATHING GHAT AT ASIT BAURI POND AT MURAGRAM1 |
Completion of work |
-
latitude : 22.99079
Longitude : 86.87975999999999
file name : Image_13022022121300760.png
|
2022-02-13 12:13:00.842907 |
228 |
35273978 |
CONSTRUCTION LADIES TOILET AT GP OFFICE |
150000 |
CONSTRUCTION LADIES TOILET AT GP OFFICE1 |
Completion of work |
-
latitude : 23.009604
Longitude : 86.8729777
file name : Image_18012022124943473.png
|
2022-01-18 12:49:43.575286 |
229 |
34576672 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KANKATA C C ROAD TO KARALDIGHI PITCH |
300000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KANKATA C C ROAD TO KARALDIGHI PITCH1 |
Completion of work |
-
latitude : 23.013221666666663,23.013221666666663,23.013221666666663,23.013221666666663
Longitude : 86.90600833333335,86.90600833333335,86.90600833333335,86.90600833333335
file name : Image_13022022121254538.png
|
2022-02-13 12:12:54.63262 |
230 |
34576672 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KANKATA C C ROAD TO KARALDIGHI PITCH |
300000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KANKATA C C ROAD TO KARALDIGHI PITCH1 |
Completion of work |
-
latitude : 23.012391666666666,23.012391666666666
Longitude : 86.90599333333333,86.90599333333333
file name : Image_13022022121308916.png
|
2022-02-13 12:13:08.97884 |
231 |
35279529 |
INSTALLATION OF SOLAR LIGT AT SUPUR GP OFFICE |
400000 |
INSTALLATION OF SOLAR LIGT AT SUPUR GP OFFICE1 |
Completion of work |
-
latitude : 23.009395
Longitude : 86.87273166666667
file name : Image_07122021152353861.png
|
2021-12-07 15:23:53.9441 |
232 |
35279529 |
INSTALLATION OF SOLAR LIGT AT SUPUR GP OFFICE |
400000 |
INSTALLATION OF SOLAR LIGT AT SUPUR GP OFFICE1 |
Completion of work |
-
latitude : 23.0095037
Longitude : 86.8729104
file name : Image_06122021175727764.png
|
2021-12-06 17:57:27.84961 |
233 |
34625160 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM DILIP ROY HOUSE TO ANIL MAHATA HOUSE |
300000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM DILIP ROY HOUSE TO ANIL MAHATA HOUSE1 |
Completion of work |
-
latitude : 22.991120000000002,22.991120000000002
Longitude : 86.88285499999999,86.88285499999999
file name : Image_14022022162151685.png
|
2022-02-14 16:21:51.780096 |
234 |
34625160 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM DILIP ROY HOUSE TO ANIL MAHATA HOUSE |
300000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM DILIP ROY HOUSE TO ANIL MAHATA HOUSE1 |
Completion of work |
-
latitude : 22.991055,22.991055,22.991055
Longitude : 86.88287833333334,86.88287833333334,86.88287833333334
file name : Image_13022022121305017.png
|
2022-02-13 12:13:05.105399 |
235 |
56684972 |
CONSTRACTION OF CC ROAD RAJYAPAL HOUSE TO MAIN ROAD AT INDKOCHA |
199829 |
CONSTRACTION OF CC ROAD RAJYAPAL HOUSE TO MAIN ROAD AT INDKOCHA1 |
Completion of work |
-
latitude : 22.98890643,22.98890702,22.98890702
Longitude : 86.88205894,86.88204645,86.88204645
file name : Image_15052023095752675.png
|
2023-05-15 09:57:52.79594 |
236 |
56684972 |
CONSTRACTION OF CC ROAD RAJYAPAL HOUSE TO MAIN ROAD AT INDKOCHA |
199829 |
CONSTRACTION OF CC ROAD RAJYAPAL HOUSE TO MAIN ROAD AT INDKOCHA1 |
Completion of work |
-
latitude : 22.98892321,22.98892321
Longitude : 86.88203743,86.88203743
file name : Image_13052023151339464.png
|
2023-05-13 15:13:39.565617 |
237 |
56684972 |
CONSTRACTION OF CC ROAD RAJYAPAL HOUSE TO MAIN ROAD AT INDKOCHA |
199829 |
CONSTRACTION OF CC ROAD RAJYAPAL HOUSE TO MAIN ROAD AT INDKOCHA1 |
Completion of work |
-
latitude : 22.98892741,22.98893301
Longitude : 86.88208526,86.8820669
file name : Image_30032023130103047.png
|
2023-03-30 13:01:03.154455 |
238 |
34626349 |
CONSTRUCTION OF CEMENT CONCRETE DRAIN ANOARA BIBI HOUSE TO MASJID |
300000 |
CONSTRUCTION OF CEMENT CONCRETE DRAIN ANOARA BIBI HOUSE TO MASJID1 |
Completion of work |
-
latitude : 22.982084999999998,22.982084999999998
Longitude : 86.85533,86.85533
file name : Image_10122021133414887.png
|
2021-12-10 13:34:14.972786 |
239 |
34626349 |
CONSTRUCTION OF CEMENT CONCRETE DRAIN ANOARA BIBI HOUSE TO MASJID |
300000 |
CONSTRUCTION OF CEMENT CONCRETE DRAIN ANOARA BIBI HOUSE TO MASJID1 |
Completion of work |
-
latitude : 22.9847972,22.982169999999996
Longitude : 86.852619,86.85562166666665
file name : Image_21112021102547724.png
|
2021-11-21 10:25:47.847826 |
240 |
34561606 |
CONSTRUCTION OF PROTECTION WALL AND DRAIN FROM DURGADAS POND TO FIELD AT DHARRAMOULI |
371028 |
CONSTRUCTION OF PROTECTION WALL AND DRAIN FROM DURGADAS POND TO FIELD AT DHARRAMOULI1 |
Completion of work |
-
latitude : 23.025365000000004
Longitude : 86.89322500000002
file name : Image_31032022171917408.png
|
2022-03-31 17:19:17.503734 |
241 |
34561606 |
CONSTRUCTION OF PROTECTION WALL AND DRAIN FROM DURGADAS POND TO FIELD AT DHARRAMOULI |
371028 |
CONSTRUCTION OF PROTECTION WALL AND DRAIN FROM DURGADAS POND TO FIELD AT DHARRAMOULI1 |
Completion of work |
-
latitude : 23.025348333333334
Longitude : 86.89318999999999
file name : Image_31032022171923077.png
|
2022-03-31 17:19:23.172558 |
242 |
34561606 |
CONSTRUCTION OF PROTECTION WALL AND DRAIN FROM DURGADAS POND TO FIELD AT DHARRAMOULI |
371028 |
CONSTRUCTION OF PROTECTION WALL AND DRAIN FROM DURGADAS POND TO FIELD AT DHARRAMOULI1 |
Completion of work |
-
latitude : 23.025365000000004
Longitude : 86.89322500000002
file name : Image_29032022153948499.png
|
2022-03-29 15:39:48.806462 |
243 |
34561606 |
CONSTRUCTION OF PROTECTION WALL AND DRAIN FROM DURGADAS POND TO FIELD AT DHARRAMOULI |
371028 |
CONSTRUCTION OF PROTECTION WALL AND DRAIN FROM DURGADAS POND TO FIELD AT DHARRAMOULI1 |
Completion of work |
-
latitude : 23.0253111
Longitude : 86.8936095
file name : Image_23032022122215308.png
|
2022-03-23 12:22:15.398789 |
244 |
34594170 |
CONSTRUCTION OF BOUNDARY WALL AT VEDUARA PRY SCHOOL |
250000 |
CONSTRUCTION OF BOUNDARY WALL AT VEDUARA PRY SCHOOL1 |
Completion of work |
-
latitude : 23.003791666666665
Longitude : 86.87504666666668
file name : Image_23022022134920406.png
|
2022-02-23 13:49:20.48895 |
245 |
34594170 |
CONSTRUCTION OF BOUNDARY WALL AT VEDUARA PRY SCHOOL |
250000 |
CONSTRUCTION OF BOUNDARY WALL AT VEDUARA PRY SCHOOL1 |
Completion of work |
-
latitude : 23.00373833333333
Longitude : 86.87494666666667
file name : Image_23022022134712243.png
|
2022-02-23 13:47:12.336527 |
246 |
34594170 |
CONSTRUCTION OF BOUNDARY WALL AT VEDUARA PRY SCHOOL |
250000 |
CONSTRUCTION OF BOUNDARY WALL AT VEDUARA PRY SCHOOL1 |
Completion of work |
-
latitude : 23.00357166666667
Longitude : 86.87518333333334
file name : Image_23022022125837637.png
|
2022-02-23 12:58:37.753271 |
247 |
57072218 |
Installation of MII tube well near BalaramPur Durga mela including platform drain etc |
90000 |
Installation of MII tube well near BalaramPur Durga mela including platform drain etc1 |
Completion of work |
-
latitude : 23.02011
Longitude : 86.85514666666668
file name : Image_19072022074336360.png
|
2022-07-19 07:43:36.453845 |
248 |
57072218 |
Installation of MII tube well near BalaramPur Durga mela including platform drain etc |
90000 |
Installation of MII tube well near BalaramPur Durga mela including platform drain etc1 |
Completion of work |
-
latitude : 23.02011333333333
Longitude : 86.85513666666665
file name : Image_19072022074439087.png
|
2022-07-19 07:44:39.180481 |
249 |
34624486 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM INDKOCHA MAIN ROAD TO KALI MELA |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM INDKOCHA MAIN ROAD TO KALI MELA1 |
Completion of work |
-
latitude : 22.98734562,22.98734229
Longitude : 86.8887726,86.88878441
file name : Image_20022021104938365.png
|
2021-02-20 10:49:38.44335 |
250 |
34609781 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM ATCHALA TO RABAN BAURI HOUSE AT RADHAMOHAN PUR |
300000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM ATCHALA TO RABAN BAURI HOUSE AT RADHAMOHAN PUR1 |
Completion of work |
-
latitude : 23.00573325,23.00573849
Longitude : 86.84300971,86.84299871
file name : Image_23022021095659516.png
|
2021-02-23 09:56:59.600935 |
251 |
34621033 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KUCHIYARA MAIN PITCH TO RAMESH ROY HOUSE |
200000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KUCHIYARA MAIN PITCH TO RAMESH ROY HOUSE1 |
Completion of work |
-
latitude : 23.02164464,23.02164356
Longitude : 86.84656089,86.84656124
file name : Image_22022021120822784.png
|
2021-02-22 12:08:22.867368 |
252 |
34581537 |
CONSTRUCTION OF BATHING GHAT AT MULBUT BARA BUND POND EMBANKMENT |
150000 |
CONSTRUCTION OF BATHING GHAT AT MULBUT BARA BUND POND EMBANKMENT1 |
Plinth level |
-
latitude : 23.00675833333333
Longitude : 86.88032
file name : Image_16122021140211504.png
|
2021-12-16 14:02:11.572355 |
253 |
34581537 |
CONSTRUCTION OF BATHING GHAT AT MULBUT BARA BUND POND EMBANKMENT |
150000 |
CONSTRUCTION OF BATHING GHAT AT MULBUT BARA BUND POND EMBANKMENT1 |
Completion of work |
-
latitude : 23.00761449
Longitude : 86.87873616
file name : Image_02032021105325091.png
|
2021-03-02 10:53:25.192798 |
254 |
34550175 |
CONSTRUCTION OF SCHOOL BOUNDARY WALL AT DHARRAMOULI PRIMARY SCHOOL |
200000 |
CONSTRUCTION OF SCHOOL BOUNDARY WALL AT DHARRAMOULI PRIMARY SCHOOL1 |
Plinth level |
-
latitude : 23.023761666666662
Longitude : 86.89008666666665
file name : Image_25072021125813353.png
|
2021-07-25 12:58:13.474837 |
255 |
34591236 |
CONSTRUCTION OF SASAN CHHULLI VEDUARA KAMAR POND EMBANKMENT |
200000 |
CONSTRUCTION OF SASAN CHHULLI VEDUARA KAMAR POND EMBANKMENT1 |
Completion of work |
-
latitude : 23.01103666666667
Longitude : 86.88800166666667
file name : Image_28012022130202382.png
|
2022-01-28 13:02:02.466599 |
256 |
34591236 |
CONSTRUCTION OF SASAN CHHULLI VEDUARA KAMAR POND EMBANKMENT |
200000 |
CONSTRUCTION OF SASAN CHHULLI VEDUARA KAMAR POND EMBANKMENT1 |
Completion of work |
-
latitude : 23.010891666666666
Longitude : 86.88800166666667
file name : Image_16122021140220932.png
|
2021-12-16 14:02:20.998366 |
257 |
34592173 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM HARI MANDIR TO MATHUR GIRI HOUSE AT VEDUARA |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM HARI MANDIR TO MATHUR GIRI HOUSE AT VEDUARA1 |
Completion of work |
-
latitude : 23.006925000000003,23.006925000000003
Longitude : 86.876745,86.876745
file name : Image_21092021134811209.png
|
2021-09-21 13:48:11.293934 |
258 |
34592173 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM HARI MANDIR TO MATHUR GIRI HOUSE AT VEDUARA |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM HARI MANDIR TO MATHUR GIRI HOUSE AT VEDUARA1 |
Completion of work |
-
latitude : 23.006840000000004,23.006840000000004
Longitude : 86.87673000000001,86.87673000000001
file name : Image_21092021134328026.png
|
2021-09-21 13:43:28.123077 |
259 |
34604798 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM SHYAMAL MANDAL HOUSE TO BIJOY MANDAL HOUSE BAGERDIHI |
200000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM SHYAMAL MANDAL HOUSE TO BIJOY MANDAL HOUSE BAGERDIHI1 |
Completion of work |
-
latitude : 23.001645,23.001645,23.001645,23.001645
Longitude : 86.866825,86.866825,86.866825,86.866825
file name : Image_24032022132018686.png
|
2022-03-24 13:20:18.779625 |
260 |
34604798 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM SHYAMAL MANDAL HOUSE TO BIJOY MANDAL HOUSE BAGERDIHI |
200000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM SHYAMAL MANDAL HOUSE TO BIJOY MANDAL HOUSE BAGERDIHI1 |
Completion of work |
-
latitude : 23.001744999999996,23.001744999999996
Longitude : 86.86682333333334,86.86682333333334
file name : Image_24032022132025068.png
|
2022-03-24 13:20:25.163226 |
261 |
57017130 |
Installation of MII tube well near Bachan Bauri house at Bheduara Bauri Para including platform drai |
90000 |
Installation of MII tube well near Bachan Bauri house at Bheduara Bauri Para including platform drai1 |
Completion of work |
-
latitude : 23.003535000000003
Longitude : 86.874905
file name : Image_15072022174520152.png
|
2022-07-15 17:45:20.257877 |
262 |
57017130 |
Installation of MII tube well near Bachan Bauri house at Bheduara Bauri Para including platform drai |
90000 |
Installation of MII tube well near Bachan Bauri house at Bheduara Bauri Para including platform drai1 |
Completion of work |
-
latitude : 23.003836666666665
Longitude : 86.87498166666667
file name : Image_04072022113907123.png
|
2022-07-04 11:39:07.222684 |
263 |
56684481 |
CONSTRACTION OF SAMSAN GHAR AT DABAR MARAL POND |
197721 |
CONSTRACTION OF SAMSAN GHAR AT DABAR MARAL POND1 |
Roof laid |
-
latitude : 22.99778987
Longitude : 86.88238405
file name : Image_12032024120545248.png
|
2024-03-12 12:05:45.326746 |
264 |
56684481 |
CONSTRACTION OF SAMSAN GHAR AT DABAR MARAL POND |
197721 |
CONSTRACTION OF SAMSAN GHAR AT DABAR MARAL POND1 |
Completion of work |
-
latitude : 22.998358
Longitude : 86.88572701
file name : Image_09062023201457759.png
|
2023-06-09 20:14:57.833178 |
265 |
57074102 |
Installation of MII tube well near AnupLayek house at Ghaskola bauri para including platform drain e |
90000 |
Installation of MII tube well near AnupLayek house at Ghaskola bauri para including platform drain e1 |
Completion of work |
-
latitude : 23.018933333333333
Longitude : 86.85830333333334
file name : Image_28062022144544132.png
|
2022-06-28 14:45:44.260415 |
266 |
57074102 |
Installation of MII tube well near AnupLayek house at Ghaskola bauri para including platform drain e |
90000 |
Installation of MII tube well near AnupLayek house at Ghaskola bauri para including platform drain e1 |
Completion of work |
-
latitude : 23.02360666666667
Longitude : 86.854805
file name : Image_28062022144551190.png
|
2022-06-28 14:45:51.296019 |
267 |
57069454 |
Installation of MII tube well near Dulal Hasda house at Hasapathar including platform drain etc |
90000 |
Installation of MII tube well near Dulal Hasda house at Hasapathar including platform drain etc1 |
Completion of work |
-
latitude : 23.019430000000003
Longitude : 86.87696
file name : Image_25062022125216895.png
|
2022-06-25 12:52:17.014544 |
268 |
57069454 |
Installation of MII tube well near Dulal Hasda house at Hasapathar including platform drain etc |
90000 |
Installation of MII tube well near Dulal Hasda house at Hasapathar including platform drain etc1 |
Completion of work |
-
latitude : 23.019310000000004
Longitude : 86.877065
file name : Image_22062022111240892.png
|
2022-06-22 11:12:41.002656 |
269 |
57069454 |
Installation of MII tube well near Dulal Hasda house at Hasapathar including platform drain etc |
90000 |
Installation of MII tube well near Dulal Hasda house at Hasapathar including platform drain etc1 |
Completion of work |
-
latitude : 23.019413333333333
Longitude : 86.87694833333335
file name : Image_22062022125303263.png
|
2022-06-22 12:53:03.39121 |
270 |
57018131 |
Installation of MII tube well near Oshi Giri including platform draiin etc at larakham |
90000 |
Installation of MII tube well near Oshi Giri including platform draiin etc at larakham1 |
Completion of work |
-
latitude : 22.993248333333334
Longitude : 86.873165
file name : Image_28062022151532758.png
|
2022-06-28 15:15:32.855854 |
271 |
57018131 |
Installation of MII tube well near Oshi Giri including platform draiin etc at larakham |
90000 |
Installation of MII tube well near Oshi Giri including platform draiin etc at larakham1 |
Completion of work |
-
latitude : 22.993248333333334
Longitude : 86.873165
file name : Image_28062022151619025.png
|
2022-06-28 15:16:19.113525 |
272 |
57018131 |
Installation of MII tube well near Oshi Giri including platform draiin etc at larakham |
90000 |
Installation of MII tube well near Oshi Giri including platform draiin etc at larakham1 |
Completion of work |
-
latitude : 22.993225
Longitude : 86.87312500000002
file name : Image_21062022083640149.png
|
2022-06-21 08:36:40.248787 |
273 |
57024070 |
Installation of MII tube well near Himanshu Mahata house including platform drain etc atMuragram |
90000 |
Installation of MII tube well near Himanshu Mahata house including platform drain etc atMuragram1 |
Completion of work |
-
latitude : 22.989476666666665
Longitude : 86.88217166666666
file name : Image_28062022144529609.png
|
2022-06-28 14:45:29.730249 |
274 |
57024070 |
Installation of MII tube well near Himanshu Mahata house including platform drain etc atMuragram |
90000 |
Installation of MII tube well near Himanshu Mahata house including platform drain etc atMuragram1 |
Completion of work |
-
latitude : 22.98857666666667
Longitude : 86.88371833333333
file name : Image_21062022084917620.png
|
2022-06-21 08:49:17.716835 |
275 |
56678220 |
CONTRACTION OF CC.ROAD FROM SUPUR MORE TO KANGAL DAS HOUSE |
294843 |
CONTRACTION OF CC.ROAD FROM SUPUR MORE TO KANGAL DAS HOUSE1 |
Completion of work |
-
latitude : 23.02189352,23.02191661,23.02191661
Longitude : 86.85784929,86.85784479,86.85784479
file name : Image_26052023114907519.png
|
2023-05-26 11:49:07.625677 |
276 |
56678220 |
CONTRACTION OF CC.ROAD FROM SUPUR MORE TO KANGAL DAS HOUSE |
294843 |
CONTRACTION OF CC.ROAD FROM SUPUR MORE TO KANGAL DAS HOUSE1 |
Completion of work |
-
latitude : 23.0219937,23.0219937
Longitude : 86.8574879,86.8574879
file name : Image_25052023143424907.png
|
2023-05-25 14:34:25.004608 |
277 |
56678220 |
CONTRACTION OF CC.ROAD FROM SUPUR MORE TO KANGAL DAS HOUSE |
294843 |
CONTRACTION OF CC.ROAD FROM SUPUR MORE TO KANGAL DAS HOUSE1 |
Completion of work |
-
latitude : 23.02196303,23.02196386
Longitude : 86.85773479,86.85773602
file name : Image_24052023154956430.png
|
2023-05-24 15:49:56.535823 |
278 |
56704170 |
Drain cleaning Supur chhutar gali to jhalal tal |
49441 |
Drain cleaning Supur chhutar gali to jhalal tal1 |
Plinth level |
-
latitude : 23.01516739,23.01515991,23.01515991
Longitude : 86.86493671,86.86493915,86.86493915
file name : Image_27052023105543015.png
|
2023-05-27 10:55:43.10118 |
279 |
56704170 |
Drain cleaning Supur chhutar gali to jhalal tal |
49441 |
Drain cleaning Supur chhutar gali to jhalal tal1 |
Completion of work |
-
latitude : 23.01510443,23.01511323
Longitude : 86.86490718,86.86490966
file name : Image_26052023120221723.png
|
2023-05-26 12:02:21.820133 |
280 |
74368966 |
Water Supply to villages |
99825 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.0095266
Longitude : 86.8728688
file name : Image_26052023121053525.png
|
2023-05-26 12:10:53.619503 |
281 |
74370142 |
Water Supply to villages |
84454 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.00700681
Longitude : 86.8911348
file name : Image_25052023125941357.png
|
2023-05-25 12:59:41.468158 |
282 |
74370142 |
Water Supply to villages |
84454 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.00698271
Longitude : 86.89108241
file name : Image_24052023115054606.png
|
2023-05-24 11:50:54.699865 |
283 |
74370142 |
Water Supply to villages |
84454 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.00702597
Longitude : 86.89112434
file name : Image_23052023131151174.png
|
2023-05-23 13:11:51.279922 |
284 |
74370994 |
Creation of a new source of drinking water |
84454 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.00584246
Longitude : 86.89040379
file name : Image_25052023125509070.png
|
2023-05-25 12:55:09.170134 |
285 |
74370994 |
Creation of a new source of drinking water |
84454 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.00583128
Longitude : 86.89038874
file name : Image_24052023115516504.png
|
2023-05-24 11:55:16.598525 |
286 |
74370994 |
Creation of a new source of drinking water |
84454 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.00589218
Longitude : 86.89053028
file name : Image_23052023131729802.png
|
2023-05-23 13:17:29.902128 |
287 |
74373149 |
Creation of a new source of drinking water |
84454 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.00676834
Longitude : 86.87752246
file name : Image_25052023131530002.png
|
2023-05-25 13:15:30.098164 |
288 |
74373149 |
Creation of a new source of drinking water |
84454 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.00669935
Longitude : 86.87749588
file name : Image_24052023120548596.png
|
2023-05-24 12:05:48.690817 |
289 |
74373149 |
Creation of a new source of drinking water |
84454 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.00677182
Longitude : 86.87757102
file name : Image_23052023134659244.png
|
2023-05-23 13:46:59.340037 |
290 |
57016074 |
Installation of MII tube well near Harekrisha Bauri house including platform drain etc at mulbat |
90000 |
Installation of MII tube well near Harekrisha Bauri house including platform drain etc at mulbat1 |
Completion of work |
-
latitude : 23.006365
Longitude : 86.87801166666668
file name : Image_28062022153541724.png
|
2022-06-28 15:35:41.826196 |
291 |
57016074 |
Installation of MII tube well near Harekrisha Bauri house including platform drain etc at mulbat |
90000 |
Installation of MII tube well near Harekrisha Bauri house including platform drain etc at mulbat1 |
Completion of work |
-
latitude : 23.00605
Longitude : 86.87808333333332
file name : Image_29062022113003440.png
|
2022-06-29 11:30:03.543875 |
292 |
57016074 |
Installation of MII tube well near Harekrisha Bauri house including platform drain etc at mulbat |
90000 |
Installation of MII tube well near Harekrisha Bauri house including platform drain etc at mulbat1 |
Completion of work |
-
latitude : 23.019411666666663
Longitude : 86.87695166666666
file name : Image_22062022125258759.png
|
2022-06-22 12:52:58.870898 |
293 |
57016074 |
Installation of MII tube well near Harekrisha Bauri house including platform drain etc at mulbat |
90000 |
Installation of MII tube well near Harekrisha Bauri house including platform drain etc at mulbat1 |
Completion of work |
-
latitude : 23.006603333333334
Longitude : 86.87813
file name : Image_21062022094956810.png
|
2022-06-21 09:49:56.910397 |
294 |
57015466 |
Installation of MII tube well near Madhu Bauri house including platformdrain etc at domnasole |
90000 |
Installation of MII tube well near Madhu Bauri house including platformdrain etc at domnasole1 |
Completion of work |
-
latitude : 23.007226666666664
Longitude : 86.89023833333334
file name : Image_21062022094929402.png
|
2022-06-21 09:49:29.513824 |
295 |
57015466 |
Installation of MII tube well near Madhu Bauri house including platformdrain etc at domnasole |
90000 |
Installation of MII tube well near Madhu Bauri house including platformdrain etc at domnasole1 |
Completion of work |
-
latitude : 23.00802666666667
Longitude : 86.89035666666665
file name : Image_21062022094940198.png
|
2022-06-21 09:49:40.331 |
296 |
56729942 |
Construction of dustbin at supur more |
148336 |
Construction of dustbin at supur more1 |
Completion of work |
-
latitude : 23.026626
Longitude : 86.86649958
file name : Image_08062023224912711.png
|
2023-06-08 22:49:12.806768 |
297 |
73779849 |
Creation of drainage channel for management of grey water |
149313 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.025539
Longitude : 86.89578877
file name : Image_09062023201438275.png
|
2023-06-09 20:14:38.360092 |
298 |
73778828 |
Creation of drainage channel for management of grey water |
121470 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.99704342
Longitude : 86.83637077
file name : Image_09062023201451710.png
|
2023-06-09 20:14:51.79646 |
299 |
56705005 |
Dustbin cleaning from Supur More Dustbin |
50000 |
Dustbin cleaning from Supur More Dustbin1 |
Plinth level |
-
latitude : 23.02251247
Longitude : 86.85782912
file name : Image_05072023113531457.png
|
2023-07-05 11:35:31.556998 |
300 |
56705005 |
Dustbin cleaning from Supur More Dustbin |
50000 |
Dustbin cleaning from Supur More Dustbin1 |
Completion of work |
-
latitude : 23.02224806
Longitude : 86.85953162
file name : Image_05072023092945895.png
|
2023-07-05 09:29:45.995833 |
301 |
56704546 |
Drain cleaning Supur pry school to Pratap Pur |
50000 |
Drain cleaning Supur pry school to Pratap Pur1 |
Plinth level |
-
latitude : 23.02697287,23.0269728
Longitude : 86.8631306,86.86313064
file name : Image_05072023113727835.png
|
2023-07-05 11:37:27.942455 |
302 |
56704546 |
Drain cleaning Supur pry school to Pratap Pur |
50000 |
Drain cleaning Supur pry school to Pratap Pur1 |
Completion of work |
-
latitude : 23.02699165,23.02698863
Longitude : 86.86328566,86.86329622
file name : Image_05072023093238407.png
|
2023-07-05 09:32:38.538804 |
303 |
49277349 |
PURCHASE OF TUBEWELL PARTS WITH TUBEWELL MECHANIK |
300000 |
PURCHASE OF TUBEWELL PARTS WITH TUBEWELL MECHANIK1 |
Plinth level |
-
latitude : 23.00938208
Longitude : 86.87280064
file name : Image_06102023132218110.png
|
2023-10-06 13:22:18.204573 |
304 |
49277349 |
PURCHASE OF TUBEWELL PARTS WITH TUBEWELL MECHANIK |
300000 |
PURCHASE OF TUBEWELL PARTS WITH TUBEWELL MECHANIK1 |
Completion of work |
-
latitude : 23.0094824
Longitude : 86.8728758
file name : Image_06102023131805686.png
|
2023-10-06 13:18:05.785508 |
305 |
67433680 |
Drainage Construction |
207399 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.98484386
Longitude : 86.85292601
file name : Image_18102023071722006.png
|
2023-10-18 07:17:22.088009 |
306 |
67433680 |
Drainage Construction |
207399 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.98492774
Longitude : 86.85291741
file name : Image_17102023080032925.png
|
2023-10-17 08:00:33.010763 |
307 |
67433680 |
Drainage Construction |
207399 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.98509122
Longitude : 86.89006035
file name : Image_15102023101122562.png
|
2023-10-15 10:11:22.656574 |
308 |
56539985 |
CONSTRACTIONOFCCROADFROMRADHAMOHANPURHIGHSCHOOLTORADHUBAURIHOUSE |
244945 |
CONSTRACTIONOFCCROADFROMRADHAMOHANPURHIGHSCHOOLTORADHUBAURIHOUSE1 |
Plinth level |
-
latitude : 22.99606831,22.99606664,22.99606664
Longitude : 86.85242023,86.85241926,86.85241926
file name : Image_12092023162305842.png
|
2023-09-12 16:23:05.947125 |
309 |
56539985 |
CONSTRACTIONOFCCROADFROMRADHAMOHANPURHIGHSCHOOLTORADHUBAURIHOUSE |
244945 |
CONSTRACTIONOFCCROADFROMRADHAMOHANPURHIGHSCHOOLTORADHUBAURIHOUSE1 |
Plinth level |
-
latitude : 22.99608937,22.99608937
Longitude : 86.85232452,86.85232452
file name : Image_11092023150224847.png
|
2023-09-11 15:02:26.147529 |
310 |
56539985 |
CONSTRACTIONOFCCROADFROMRADHAMOHANPURHIGHSCHOOLTORADHUBAURIHOUSE |
244945 |
CONSTRACTIONOFCCROADFROMRADHAMOHANPURHIGHSCHOOLTORADHUBAURIHOUSE1 |
Completion of work |
-
latitude : 22.9957268,22.99572623
Longitude : 86.85382409,86.85382818
file name : Image_09062023201454696.png
|
2023-06-09 20:14:54.772274 |
311 |
68270528 |
Drinking water facility |
60000 |
Drinking water facility1 |
|
-
latitude : 23.0095038
Longitude : 86.8729046
file name : Image_07112023154856133.png
|
2023-11-07 15:48:56.439735 |
312 |
68270528 |
Drinking water facility |
60000 |
Drinking water facility1 |
|
-
latitude : 23.0095088
Longitude : 86.872908
file name : Image_03112023142545848.png
|
2023-11-03 14:25:45.948422 |
313 |
56687855 |
CONSTRACTION OF CC ROAD RABAN MURMU HOUSE TO BRINDABAN DAS HOUSE AT RAIDIHI |
198629 |
CONSTRACTION OF CC ROAD RABAN MURMU HOUSE TO BRINDABAN DAS HOUSE AT RAIDIHI1 |
Plinth level |
-
latitude : 23.02544394,23.02544394
Longitude : 86.89183892,86.89183892
file name : Image_29092023113815409.png
|
2023-09-29 11:38:15.509601 |
314 |
56687855 |
CONSTRACTION OF CC ROAD RABAN MURMU HOUSE TO BRINDABAN DAS HOUSE AT RAIDIHI |
198629 |
CONSTRACTION OF CC ROAD RABAN MURMU HOUSE TO BRINDABAN DAS HOUSE AT RAIDIHI1 |
Completion of work |
-
latitude : 23.02554148,23.02554148
Longitude : 86.89234656,86.89234656
file name : Image_30032023133718970.png
|
2023-03-30 13:37:19.076327 |
315 |
68150499 |
Drinking water facilities |
254684 |
Drinking water facilities1 |
Roof laid |
-
latitude : 23.0245738
Longitude : 86.85016762
file name : Image_17102023172212363.png
|
2023-10-17 17:22:12.450346 |
316 |
68150499 |
Drinking water facilities |
254684 |
Drinking water facilities1 |
Plinth level |
-
latitude : 23.02454031
Longitude : 86.85012255
file name : Image_16102023142504214.png
|
2023-10-16 14:25:04.306396 |
317 |
68150499 |
Drinking water facilities |
254684 |
Drinking water facilities1 |
Completion of work |
-
latitude : 23.02466359
Longitude : 86.85022853
file name : Image_14102023123016472.png
|
2023-10-14 12:30:16.562685 |
318 |
67371702 |
Drinking water facility |
86203 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.01827514
Longitude : 86.86192343
file name : Image_17102023112959360.png
|
2023-10-17 11:29:59.451605 |
319 |
67371702 |
Drinking water facility |
86203 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.01819043
Longitude : 86.86194871
file name : Image_16102023141107159.png
|
2023-10-16 14:11:07.295343 |
320 |
67371702 |
Drinking water facility |
86203 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.01833839
Longitude : 86.861962
file name : Image_14102023124948583.png
|
2023-10-14 12:49:48.674838 |
321 |
67722581 |
Electricity/Solar Power Installation |
47361 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 23.00209502
Longitude : 86.87421077
file name : Image_17102023163141613.png
|
2023-10-17 16:31:41.718855 |
322 |
67722581 |
Electricity/Solar Power Installation |
47361 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 23.00214237
Longitude : 86.87418831
file name : Image_14102023115359913.png
|
2023-10-14 11:54:00.004398 |
323 |
67373646 |
Drinking water facility |
86203 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.00760439
Longitude : 86.88464488
file name : Image_17102023180813217.png
|
2023-10-17 18:08:13.491787 |
324 |
67373646 |
Drinking water facility |
86203 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.00765649
Longitude : 86.88453605
file name : Image_16102023112219330.png
|
2023-10-16 11:22:19.436718 |
325 |
67373646 |
Drinking water facility |
86203 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.00763073
Longitude : 86.88453241
file name : Image_14102023092906773.png
|
2023-10-14 09:29:06.859993 |
326 |
67725393 |
Electricity/Solar Power Installation |
47361 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 23.02231882
Longitude : 86.85246754
file name : Image_17102023170455899.png
|
2023-10-17 17:04:56.02736 |
327 |
67725393 |
Electricity/Solar Power Installation |
47361 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 23.02250025
Longitude : 86.8523898
file name : Image_14102023122027341.png
|
2023-10-14 12:20:27.426958 |
328 |
67723716 |
Electricity/Solar Power Installation |
47361 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 23.01369277
Longitude : 86.86712764
file name : Image_17102023165409719.png
|
2023-10-17 16:54:09.866809 |
329 |
67723716 |
Electricity/Solar Power Installation |
47361 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 23.01400113
Longitude : 86.86676807
file name : Image_14102023125328927.png
|
2023-10-14 12:53:29.016662 |
330 |
67723026 |
Electricity/Solar Power Installation |
47361 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 23.02207016
Longitude : 86.85757899
file name : Image_17102023173659203.png
|
2023-10-17 17:36:59.289043 |
331 |
67723026 |
Electricity/Solar Power Installation |
47361 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 23.0219489
Longitude : 86.8581047
file name : Image_14102023121710128.png
|
2023-10-14 12:17:10.222628 |
332 |
67432795 |
Drainage Construction |
210000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.01067333
Longitude : 86.88794648
file name : Image_17112023105959898.png
|
2023-11-17 10:59:59.991398 |
333 |
67432795 |
Drainage Construction |
210000 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.97890417
Longitude : 86.88525139
file name : Image_09112023151539173.png
|
2023-11-09 15:15:39.271924 |
334 |
67432795 |
Drainage Construction |
210000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.01072525
Longitude : 86.88799303
file name : Image_08112023143038781.png
|
2023-11-08 14:30:39.060993 |
335 |
67398947 |
Drinking water facility |
140000 |
Drinking water facility1 |
Roof laid |
-
latitude : 23.00044061
Longitude : 86.83813785
file name : Image_03122023121721106.png
|
2023-12-03 12:17:21.20413 |
336 |
67398947 |
Drinking water facility |
140000 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.01980135
Longitude : 86.85849337
file name : Image_09112023162424355.png
|
2023-11-09 16:24:24.485738 |
337 |
67398947 |
Drinking water facility |
140000 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.00034829
Longitude : 86.83807933
file name : Image_08112023163101894.png
|
2023-11-08 16:31:02.179734 |
338 |
67723374 |
Electricity/Solar Power Installation |
47360 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 23.01640153
Longitude : 86.8643325
file name : Image_17102023165504644.png
|
2023-10-17 16:55:04.760318 |
339 |
67723374 |
Electricity/Solar Power Installation |
47360 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 23.01637684
Longitude : 86.86433646
file name : Image_15102023101139499.png
|
2023-10-15 10:11:39.587117 |
340 |
67723374 |
Electricity/Solar Power Installation |
47360 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 23.01637684
Longitude : 86.86433646
file name : Image_15102023101128406.png
|
2023-10-15 10:11:28.49758 |
341 |
68272449 |
Construction of Community Sanitary Complex |
150000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.02158496
Longitude : 86.85146618
file name : Image_17102023170812045.png
|
2023-10-17 17:08:12.148527 |
342 |
68272449 |
Construction of Community Sanitary Complex |
150000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.02152281
Longitude : 86.85142497
file name : Image_16102023141955705.png
|
2023-10-16 14:19:55.796518 |
343 |
68272449 |
Construction of Community Sanitary Complex |
150000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.02167304
Longitude : 86.85141931
file name : Image_14102023122301646.png
|
2023-10-14 12:23:01.737169 |
344 |
68271289 |
Drinking water facility |
80000 |
Drinking water facility1 |
|
-
latitude : 23.0039393
Longitude : 86.85621979
file name : Image_10112023143426515.png
|
2023-11-10 14:34:26.605124 |
345 |
56687442 |
CONSTRACTION OF CEMENT CONCRETE DAS PARA ROAD HARI MANDIR AREA AT DHARRAMOULI |
162549 |
CONSTRACTION OF CEMENT CONCRETE DAS PARA ROAD HARI MANDIR AREA AT DHARRAMOULI1 |
Roof laid |
-
latitude : 22.98775224,22.98775006,22.98774895
Longitude : 86.88845979,86.88846066,86.88846114
file name : Image_11012024121809617.png
|
2024-01-11 12:18:09.724114 |
346 |
56687442 |
CONSTRACTION OF CEMENT CONCRETE DAS PARA ROAD HARI MANDIR AREA AT DHARRAMOULI |
162549 |
CONSTRACTION OF CEMENT CONCRETE DAS PARA ROAD HARI MANDIR AREA AT DHARRAMOULI1 |
Completion of work |
-
latitude : 22.98727567,22.98727565
Longitude : 86.88879109,86.88879107
file name : Image_09062023201500872.png
|
2023-06-09 20:15:00.957014 |
347 |
67371517 |
Drinking water facility |
140000 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.01785167
Longitude : 86.90542032
file name : Image_03112023113818963.png
|
2023-11-03 11:38:19.077408 |
348 |
67371517 |
Drinking water facility |
140000 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.01781994
Longitude : 86.90546385
file name : Image_02112023094342807.png
|
2023-11-02 09:43:42.895503 |
349 |
67371517 |
Drinking water facility |
140000 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.01781397
Longitude : 86.90539802
file name : Image_31102023200618830.png
|
2023-10-31 20:06:18.912892 |
350 |
67371517 |
Drinking water facility |
140000 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.01782576
Longitude : 86.90544209
file name : Image_31102023112534075.png
|
2023-10-31 11:25:36.570077 |
351 |
67722135 |
Electricity/Solar Power Installation |
47361 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 23.01956195
Longitude : 86.85895718
file name : Image_17102023165859878.png
|
2023-10-17 16:58:59.99526 |
352 |
67722135 |
Electricity/Solar Power Installation |
47361 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 23.01968287
Longitude : 86.85885718
file name : Image_14102023124653980.png
|
2023-10-14 12:46:54.075309 |
353 |
67375293 |
Drinking water facility |
86203 |
Drinking water facility1 |
Roof laid |
-
latitude : 23.02684367
Longitude : 86.8504652
file name : Image_17102023172215903.png
|
2023-10-17 17:22:15.991046 |
354 |
67375293 |
Drinking water facility |
86203 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.02680919
Longitude : 86.85045183
file name : Image_16102023142737574.png
|
2023-10-16 14:27:37.677017 |
355 |
67375293 |
Drinking water facility |
86203 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.02685578
Longitude : 86.8504609
file name : Image_14102023123627615.png
|
2023-10-14 12:36:27.703537 |
356 |
67374719 |
Drinking water facility |
86203 |
Drinking water facility1 |
Roof laid |
-
latitude : 23.0018312
Longitude : 86.87311748
file name : Image_17102023162256305.png
|
2023-10-17 16:22:56.398083 |
357 |
67374719 |
Drinking water facility |
86203 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.0018202
Longitude : 86.87304849
file name : Image_16102023113555517.png
|
2023-10-16 11:35:55.626304 |
358 |
67374719 |
Drinking water facility |
86203 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.00190231
Longitude : 86.87307759
file name : Image_14102023114615857.png
|
2023-10-14 11:46:15.951508 |
359 |
67371805 |
Drinking water facility |
86203 |
Drinking water facility1 |
Roof laid |
-
latitude : 23.01272268
Longitude : 86.874975
file name : Image_17102023164532029.png
|
2023-10-17 16:45:32.117294 |
360 |
67371805 |
Drinking water facility |
86203 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.01265496
Longitude : 86.87488534
file name : Image_16102023140021488.png
|
2023-10-16 14:00:21.576699 |
361 |
67371805 |
Drinking water facility |
86203 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.01286428
Longitude : 86.87498148
file name : Image_14102023120758313.png
|
2023-10-14 12:07:58.390763 |
362 |
73722199 |
Creation of drainage channel for management of grey water |
157630 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.03069447
Longitude : 86.88283546
file name : Image_19012024125353756.png
|
2024-01-19 12:53:53.846736 |
363 |
73722199 |
Creation of drainage channel for management of grey water |
157630 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.0308431
Longitude : 86.88224687
file name : Image_09062023201441994.png
|
2023-06-09 20:14:42.081416 |
364 |
67433153 |
Drainage Construction |
139327 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.00040291
Longitude : 86.87558649
file name : Image_17102023162022043.png
|
2023-10-17 16:20:22.133172 |
365 |
67433153 |
Drainage Construction |
139327 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.00045851
Longitude : 86.87556072
file name : Image_16102023113202486.png
|
2023-10-16 11:32:02.588498 |
366 |
67433153 |
Drainage Construction |
139327 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.00049542
Longitude : 86.8755638
file name : Image_14102023120011767.png
|
2023-10-14 12:00:11.853823 |
367 |
67897335 |
Drinking water facilities |
250000 |
Drinking water facilities1 |
|
-
latitude : 23.00947192
Longitude : 86.87287014
file name : Image_05022024115049062.png
|
2024-02-05 11:50:49.145618 |
368 |
67377110 |
Construction of roads |
255322 |
Construction of roads1 |
Plinth level |
-
latitude : 23.01101176,23.01101175,23.01101175
Longitude : 86.85041694,86.85041688,86.85041688
file name : Image_05122023123958780.png
|
2023-12-05 12:39:58.88061 |
369 |
67377110 |
Construction of roads |
255322 |
Construction of roads1 |
Plinth level |
-
latitude : 23.01102278,23.01102278,23.01102306
Longitude : 86.85043769,86.85043769,86.85042089
file name : Image_05122023123852521.png
|
2023-12-05 12:38:52.622163 |
370 |
67377110 |
Construction of roads |
255322 |
Construction of roads1 |
Completion of work |
-
latitude : 23.0113298,23.01129613,23.01111313
Longitude : 86.8504986,86.85051579,86.85040413
file name : Image_03122023115612092.png
|
2023-12-03 11:56:12.170842 |
371 |
67377745 |
Construction of roads |
255322 |
Construction of roads1 |
Plinth level |
-
latitude : 23.02366027,23.02366027,23.02366165
Longitude : 86.85484394,86.85484394,86.85484292
file name : Image_12122023145821848.png
|
2023-12-12 14:58:21.941957 |
372 |
67377745 |
Construction of roads |
255322 |
Construction of roads1 |
Plinth level |
-
latitude : 23.02366256,23.02366256,23.02366174
Longitude : 86.85471426,86.85471426,86.85471338
file name : Image_05122023131018569.png
|
2023-12-05 13:10:18.668797 |
373 |
67377745 |
Construction of roads |
255322 |
Construction of roads1 |
Completion of work |
-
latitude : 23.02354571,23.0233293
Longitude : 86.85477031,86.8538021
file name : Image_01122023165725146.png
|
2023-12-01 16:57:25.353851 |
374 |
67431977 |
Drainage Construction |
225853 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.03097612
Longitude : 86.88183023
file name : Image_15122023141507835.png
|
2023-12-15 14:15:07.939703 |
375 |
67431977 |
Drainage Construction |
225853 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.03092256
Longitude : 86.88177067
file name : Image_05122023142446617.png
|
2023-12-05 14:24:46.715387 |
376 |
67431977 |
Drainage Construction |
225853 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.03095632
Longitude : 86.8817821
file name : Image_01122023163755608.png
|
2023-12-01 16:37:55.719646 |
377 |
39037554 |
const of submursible at gourmanipur |
339446 |
const of submursible at gourmanipur1 |
Completion of work |
-
latitude : 23.01192164
Longitude : 86.85069484
file name : Image_28042023133331515.png
|
2023-04-28 13:33:31.617628 |
378 |
39037554 |
const of submursible at gourmanipur |
339446 |
const of submursible at gourmanipur1 |
Completion of work |
-
latitude : 23.01196633
Longitude : 86.85069927
file name : Image_28042023133437859.png
|
2023-04-28 13:34:37.981139 |
379 |
39037554 |
const of submursible at gourmanipur |
339446 |
const of submursible at gourmanipur1 |
Completion of work |
-
latitude : 23.01193123
Longitude : 86.85071651
file name : Image_26042023164244294.png
|
2023-04-26 16:42:44.441821 |
380 |
39037554 |
const of submursible at gourmanipur |
339446 |
const of submursible at gourmanipur1 |
Completion of work |
-
latitude : 23.01205357
Longitude : 86.85070807
file name : Image_25042023113527952.png
|
2023-04-25 11:35:28.317239 |
381 |
39037554 |
const of submursible at gourmanipur |
339446 |
const of submursible at gourmanipur1 |
Completion of work |
-
latitude : 23.0120902
Longitude : 86.85069344
file name : Image_25042023122302242.png
|
2023-04-25 12:23:02.342463 |
382 |
39037300 |
constructio of submursible at bheduara |
338607 |
constructio of submursible at bheduara1 |
Completion of work |
-
latitude : 23.01717575
Longitude : 86.84246395
file name : Image_30062023185233123.png
|
2023-06-30 18:52:33.227659 |
383 |
39037300 |
constructio of submursible at bheduara |
338607 |
constructio of submursible at bheduara1 |
Completion of work |
-
latitude : 23.01711079
Longitude : 86.84251228
file name : Image_10062023002614674.png
|
2023-06-10 00:26:14.776919 |
384 |
39037300 |
constructio of submursible at bheduara |
338607 |
constructio of submursible at bheduara1 |
Completion of work |
-
latitude : 23.01712623
Longitude : 86.84240709
file name : Image_10062023002622983.png
|
2023-06-10 00:26:23.07142 |
385 |
39037300 |
constructio of submursible at bheduara |
338607 |
constructio of submursible at bheduara1 |
Completion of work |
-
latitude : 23.01712623
Longitude : 86.84240709
file name : Image_10062023002631043.png
|
2023-06-10 00:26:31.123356 |
386 |
39037486 |
const of submurssible at khatra muslim para |
346445 |
const of submurssible at khatra muslim para1 |
Completion of work |
-
latitude : 23.0079662
Longitude : 86.85065089
file name : Image_30062023183749953.png
|
2023-06-30 18:37:50.171685 |
387 |
39037486 |
const of submurssible at khatra muslim para |
346445 |
const of submurssible at khatra muslim para1 |
Completion of work |
-
latitude : 23.00802813
Longitude : 86.85073327
file name : Image_09062023201448615.png
|
2023-06-09 20:14:48.688211 |
388 |
39037603 |
const of submursible at radhamohan pur |
346445 |
const of submursible at radhamohan pur1 |
Plinth level |
-
latitude : 23.0238216
Longitude : 86.8539475
file name : Image_05072023094127199.png
|
2023-07-05 09:41:27.310841 |
389 |
39037603 |
const of submursible at radhamohan pur |
346445 |
const of submursible at radhamohan pur1 |
Plinth level |
-
latitude : 23.0238212
Longitude : 86.8539471
file name : Image_04072023143556809.png
|
2023-07-04 14:35:56.908282 |
390 |
39037603 |
const of submursible at radhamohan pur |
346445 |
const of submursible at radhamohan pur1 |
Completion of work |
-
latitude : 23.02376239
Longitude : 86.85383154
file name : Image_01072023114624329.png
|
2023-07-01 11:46:24.295384 |
391 |
39037603 |
const of submursible at radhamohan pur |
346445 |
const of submursible at radhamohan pur1 |
Completion of work |
-
latitude : 23.02379945
Longitude : 86.8538082
file name : Image_01072023114659590.png
|
2023-07-01 11:46:59.691003 |
392 |
74371947 |
Water Supply to villages |
84454 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.98834771
Longitude : 86.85880849
file name : Image_04072023132327694.png
|
2023-07-04 13:23:27.790175 |
393 |
74371947 |
Water Supply to villages |
84454 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.99608684
Longitude : 86.87445531
file name : Image_08062023230648837.png
|
2023-06-08 23:06:48.99969 |
394 |
56706564 |
Construction of cc drain from Uday Pramanik houe to Banchharam Bauri house for removal of gurbage |
300000 |
Construction of cc drain from Uday Pramanik houe to Banchharam Bauri house for removal of gurbage 1 |
Plinth level |
-
latitude : 23.01712059,23.01711877,23.01711877,23.01711877
Longitude : 86.86709918,86.86709212,86.86709212,86.86709212
file name : Image_11122023132817939.png
|
2023-12-11 13:28:18.045693 |
395 |
56706564 |
Construction of cc drain from Uday Pramanik houe to Banchharam Bauri house for removal of gurbage |
300000 |
Construction of cc drain from Uday Pramanik houe to Banchharam Bauri house for removal of gurbage 1 |
Completion of work |
-
latitude : 23.01704435,23.01704876
Longitude : 86.86706072,86.86706523
file name : Image_24012023132315062.png
|
2023-01-24 13:23:15.160096 |
396 |
56706564 |
Construction of cc drain from Uday Pramanik houe to Banchharam Bauri house for removal of gurbage |
300000 |
Construction of cc drain from Uday Pramanik houe to Banchharam Bauri house for removal of gurbage 1 |
Completion of work |
-
latitude : 23.01704379,23.01704328
Longitude : 86.86709364,86.86709373
file name : Image_24012023132418692.png
|
2023-01-24 13:24:18.794435 |
397 |
56706564 |
Construction of cc drain from Uday Pramanik houe to Banchharam Bauri house for removal of gurbage |
300000 |
Construction of cc drain from Uday Pramanik houe to Banchharam Bauri house for removal of gurbage 1 |
Completion of work |
-
latitude : 23.01706319,23.01706319
Longitude : 86.86706514,86.86706514
file name : Image_24012023132614587.png
|
2023-01-24 13:26:14.697058 |
398 |
56706564 |
Construction of cc drain from Uday Pramanik houe to Banchharam Bauri house for removal of gurbage |
300000 |
Construction of cc drain from Uday Pramanik houe to Banchharam Bauri house for removal of gurbage 1 |
Completion of work |
-
latitude : 23.01711289,23.01710977,23.01710977
Longitude : 86.86707539,86.86707344,86.86707344
file name : Image_03012023120258708.png
|
2023-01-03 12:02:58.792353 |
399 |
56706564 |
Construction of cc drain from Uday Pramanik houe to Banchharam Bauri house for removal of gurbage |
300000 |
Construction of cc drain from Uday Pramanik houe to Banchharam Bauri house for removal of gurbage 1 |
Completion of work |
-
latitude : 23.01709411,23.01709411
Longitude : 86.86707897,86.86707897
file name : Image_03012023120307737.png
|
2023-01-03 12:03:07.817276 |
400 |
56706564 |
Construction of cc drain from Uday Pramanik houe to Banchharam Bauri house for removal of gurbage |
300000 |
Construction of cc drain from Uday Pramanik houe to Banchharam Bauri house for removal of gurbage 1 |
Completion of work |
-
latitude : 23.01709411,23.01709411
Longitude : 86.86707897,86.86707897
file name : Image_03012023120319003.png
|
2023-01-03 12:03:19.087285 |
401 |
56772165 |
Construction of community dustbin at vardiha |
147077 |
Construction of community dustbin at vardiha1 |
Roof laid |
-
latitude : 23.00874313
Longitude : 86.85192286
file name : Image_25052023144159126.png
|
2023-05-25 14:41:59.217317 |
402 |
56772165 |
Construction of community dustbin at vardiha |
147077 |
Construction of community dustbin at vardiha1 |
Completion of work |
-
latitude : 23.00872649
Longitude : 86.85196368
file name : Image_26042023165221324.png
|
2023-04-26 16:52:21.453522 |
403 |
56772165 |
Construction of community dustbin at vardiha |
147077 |
Construction of community dustbin at vardiha1 |
Completion of work |
-
latitude : 23.00870101
Longitude : 86.85193597
file name : Image_30032023141647833.png
|
2023-03-30 14:16:47.939212 |
404 |
67397735 |
Construction of Sheds |
118980 |
Construction of Sheds1 |
Roof laid |
-
latitude : 22.98491388
Longitude : 86.89023899
file name : Image_15022024080001845.png
|
2024-02-15 08:00:02.01577 |
405 |
67397735 |
Construction of Sheds |
118980 |
Construction of Sheds1 |
Plinth level |
-
latitude : 22.98487475
Longitude : 86.89025445
file name : Image_13022024091900896.png
|
2024-02-13 09:19:00.979365 |
406 |
67397735 |
Construction of Sheds |
118980 |
Construction of Sheds1 |
Completion of work |
-
latitude : 22.98469583
Longitude : 86.89026028
file name : Image_12022024175129120.png
|
2024-02-12 17:51:29.203839 |
407 |
67394395 |
Procurement of Computer |
120000 |
Procurement of Computer1 |
|
-
latitude : 23.0095074
Longitude : 86.872917
file name : Image_13122023144124348.png
|
2023-12-13 14:41:24.439162 |
408 |
67654054 |
Installation of Computer with Internet facility |
150000 |
Installation of Computer with Internet facility1 |
|
-
latitude : 23.0095121
Longitude : 86.8729032
file name : Image_21122023123005364.png
|
2023-12-21 12:30:05.467649 |
409 |
67370748 |
Drinking water facility |
141000 |
Drinking water facility1 |
Roof laid |
-
latitude : 23.02981093
Longitude : 86.88136454
file name : Image_21032024152205968.png
|
2024-03-21 15:22:06.04449 |
410 |
67370748 |
Drinking water facility |
141000 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.02984834
Longitude : 86.88131933
file name : Image_11032024134506071.png
|
2024-03-11 13:45:06.161827 |
411 |
67370748 |
Drinking water facility |
141000 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.02984946
Longitude : 86.88145661
file name : Image_05032024124923013.png
|
2024-03-05 12:49:23.08311 |
412 |
67432968 |
Drainage Construction |
218500 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.0096194
Longitude : 86.8855351
file name : Image_08042024134539676.png
|
2024-04-08 13:45:39.753764 |
413 |
67432968 |
Drainage Construction |
218500 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.0129975
Longitude : 86.87939528
file name : Image_07032024131220025.png
|
2024-03-07 13:12:20.094991 |
414 |
67433332 |
Drainage Construction |
218500 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.02013324
Longitude : 86.85723031
file name : Image_23022024154806127.png
|
2024-02-23 15:48:06.221643 |
415 |
67433332 |
Drainage Construction |
218500 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.02010396
Longitude : 86.8572902
file name : Image_19022024131736435.png
|
2024-02-19 13:17:36.521145 |
416 |
67441855 |
Drainage Construction |
171700 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.02174041
Longitude : 86.84620764
file name : Image_04042024153002705.png
|
2024-04-04 15:30:02.767923 |
417 |
67441855 |
Drainage Construction |
171700 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.02165575
Longitude : 86.84627532
file name : Image_12032024142841725.png
|
2024-03-12 14:28:41.793561 |
418 |
67441855 |
Drainage Construction |
171700 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.02165413
Longitude : 86.84643972
file name : Image_06032024145726943.png
|
2024-03-06 14:57:27.025684 |
419 |
67433492 |
Drainage Construction |
218500 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.98866268
Longitude : 86.88402059
file name : Image_18042024104805484.png
|
2024-04-18 10:48:05.554863 |
420 |
67433492 |
Drainage Construction |
218500 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.98867613
Longitude : 86.88393539
file name : Image_05032024111721341.png
|
2024-03-05 11:17:21.421321 |
421 |
67434097 |
Drainage Construction |
218500 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.99439434
Longitude : 86.84533656
file name : Image_18032024131755121.png
|
2024-03-18 13:17:55.194662 |
422 |
67434097 |
Drainage Construction |
218500 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.99401445
Longitude : 86.84525247
file name : Image_01032024171042402.png
|
2024-03-01 17:10:42.474373 |
423 |
67377686 |
Construction of roads |
258000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.99597196,22.9959561
Longitude : 86.84476334,86.84471593
file name : Image_01042024164841231.png
|
2024-04-01 16:48:41.339512 |
424 |
67377686 |
Construction of roads |
258000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.99597749,22.99597749
Longitude : 86.84475993,86.84475993
file name : Image_01032024172043008.png
|
2024-03-01 17:20:43.088325 |
425 |
67434585 |
Drainage Construction |
218500 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.99398585
Longitude : 86.84470695
file name : Image_19042024115850788.png
|
2024-04-19 11:58:50.860931 |
426 |
67434585 |
Drainage Construction |
218500 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.9936871
Longitude : 86.84467423
file name : Image_15042024181630549.png
|
2024-04-15 18:16:30.613633 |
427 |
67434585 |
Drainage Construction |
218500 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.99386785
Longitude : 86.84466105
file name : Image_18032024132733844.png
|
2024-03-18 13:27:33.92101 |
428 |
67434585 |
Drainage Construction |
218500 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.99395459
Longitude : 86.8446505
file name : Image_01032024170656058.png
|
2024-03-01 17:06:56.131948 |
429 |
67396478 |
Construction of Building |
214000 |
Construction of Building1 |
Roof laid |
-
latitude : 23.00963799
Longitude : 86.87300806
file name : Image_14052024145547808.png
|
2024-05-14 14:55:47.872184 |
430 |
67396478 |
Construction of Building |
214000 |
Construction of Building1 |
Plinth level |
-
latitude : 23.009544
Longitude : 86.8729166
file name : Image_14052024124847727.png
|
2024-05-14 12:48:47.792628 |
431 |
67396478 |
Construction of Building |
214000 |
Construction of Building1 |
Completion of work |
-
latitude : 23.0095039
Longitude : 86.8728746
file name : Image_12032024150726151.png
|
2024-03-12 15:07:26.219527 |
432 |
67397964 |
Construction of Sheds |
119000 |
Construction of Sheds1 |
Roof laid |
-
latitude : 22.9893847
Longitude : 86.8534683
file name : Image_26022024101349846.png
|
2024-02-26 10:13:49.92144 |
433 |
67397964 |
Construction of Sheds |
119000 |
Construction of Sheds1 |
Roof laid |
-
latitude : 22.97435636
Longitude : 86.86351557
file name : Image_23022024150510607.png
|
2024-02-23 15:05:10.702126 |
434 |
67397964 |
Construction of Sheds |
119000 |
Construction of Sheds1 |
Plinth level |
-
latitude : 22.98915381
Longitude : 86.85411687
file name : Image_21022024172836190.png
|
2024-02-21 17:28:36.832178 |
435 |
67397964 |
Construction of Sheds |
119000 |
Construction of Sheds1 |
Completion of work |
-
latitude : 22.98900246
Longitude : 86.8542741
file name : Image_18022024175708322.png
|
2024-02-18 17:57:08.415313 |
436 |
67375165 |
Drinking water facility |
90000 |
Drinking water facility1 |
Roof laid |
-
latitude : 23.0223885
Longitude : 86.85098298
file name : Image_05032024123016203.png
|
2024-03-05 12:30:16.275385 |
437 |
67375165 |
Drinking water facility |
90000 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.02238808
Longitude : 86.85094832
file name : Image_23022024155213539.png
|
2024-02-23 15:52:13.63363 |
438 |
67375165 |
Drinking water facility |
90000 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.0241949
Longitude : 86.8513646
file name : Image_22022024141759093.png
|
2024-02-22 14:17:59.192641 |
439 |
67376174 |
Drinking water facility |
90000 |
Drinking water facility1 |
Roof laid |
-
latitude : 23.0320208
Longitude : 86.87659677
file name : Image_05032024124115531.png
|
2024-03-05 12:41:15.643605 |
440 |
67376174 |
Drinking water facility |
90000 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.03198053
Longitude : 86.87662571
file name : Image_23022024160538837.png
|
2024-02-23 16:05:38.928008 |
441 |
67376174 |
Drinking water facility |
90000 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.03193623
Longitude : 86.87669176
file name : Image_22022024144703611.png
|
2024-02-22 14:47:03.730126 |
442 |
67376570 |
Drinking water facility |
90000 |
Drinking water facility1 |
Plinth level |
-
latitude : 22.99064917
Longitude : 86.85204227
file name : Image_06032024174119634.png
|
2024-03-06 17:41:19.700752 |
443 |
67376570 |
Drinking water facility |
90000 |
Drinking water facility1 |
Completion of work |
-
latitude : 22.98832057
Longitude : 86.8587329
file name : Image_01032024164720429.png
|
2024-03-01 16:47:20.497694 |
444 |
67894740 |
Drinking water facilities |
99900 |
Drinking water facilities1 |
|
-
latitude : 23.00940389
Longitude : 86.87288228
file name : Image_21122023133815602.png
|
2023-12-21 13:38:15.682927 |
445 |
67896494 |
Drinking water facilities |
99900 |
Drinking water facilities1 |
|
-
latitude : 23.00940632
Longitude : 86.87287916
file name : Image_21122023133737360.png
|
2023-12-21 13:37:37.439205 |
446 |
67896774 |
Drinking water facilities |
99900 |
Drinking water facilities1 |
|
-
latitude : 23.0095083
Longitude : 86.8729024
file name : Image_21122023133649238.png
|
2023-12-21 13:36:49.319477 |
447 |
57089490 |
Installation of MII tube well near GP office including platform drain etc |
90000 |
Installation of MII tube well near GP office including platform drain etc1 |
Plinth level |
-
latitude : 23.0095003
Longitude : 86.8729121
file name : Image_11122023130349952.png
|
2023-12-11 13:03:50.050374 |
448 |
57089490 |
Installation of MII tube well near GP office including platform drain etc |
90000 |
Installation of MII tube well near GP office including platform drain etc1 |
Completion of work |
-
latitude : 23.00950299
Longitude : 86.87283172
file name : Image_27022023151457696.png
|
2023-02-27 15:14:57.790805 |
449 |
57089490 |
Installation of MII tube well near GP office including platform drain etc |
90000 |
Installation of MII tube well near GP office including platform drain etc1 |
Completion of work |
-
latitude : 23.0086498
Longitude : 86.8737119
file name : Image_17022023123026217.png
|
2023-02-17 12:30:26.314492 |
450 |
57089490 |
Installation of MII tube well near GP office including platform drain etc |
90000 |
Installation of MII tube well near GP office including platform drain etc1 |
Completion of work |
-
latitude : 22.97857739
Longitude : 86.85476985
file name : Image_17022023122701561.png
|
2023-02-17 12:27:01.664548 |
451 |
67377567 |
Construction of roads |
258000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.0067244,23.00672187
Longitude : 86.84085573,86.84085687
file name : Image_18032024135305558.png
|
2024-03-18 13:53:05.633768 |
452 |
67377567 |
Construction of roads |
258000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.00676031,23.00675997
Longitude : 86.840864,86.84086347
file name : Image_26022024083738228.png
|
2024-02-26 08:37:38.28619 |
453 |
67374846 |
Drinking water facility |
90000 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.02099317
Longitude : 86.85959168
file name : Image_12032024141624960.png
|
2024-03-12 14:16:25.025658 |
454 |
67374846 |
Drinking water facility |
90000 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.0208839
Longitude : 86.85972649
file name : Image_06032024144540809.png
|
2024-03-06 14:45:40.893829 |
455 |
67375040 |
Drinking water facility |
90000 |
Drinking water facility1 |
Roof laid |
-
latitude : 23.01960452
Longitude : 86.87113153
file name : Image_05032024130621975.png
|
2024-03-05 13:06:22.042077 |
456 |
67375040 |
Drinking water facility |
90000 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.01957737
Longitude : 86.87112542
file name : Image_23022024162810437.png
|
2024-02-23 16:28:10.544375 |
457 |
67375040 |
Drinking water facility |
90000 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.0195084
Longitude : 86.87113354
file name : Image_22022024150014126.png
|
2024-02-22 15:00:14.331732 |
458 |
67376415 |
Drinking water facility |
90000 |
Drinking water facility1 |
Roof laid |
-
latitude : 22.9905574
Longitude : 86.8520358
file name : Image_13032024143947642.png
|
2024-03-13 14:39:47.627658 |
459 |
67376415 |
Drinking water facility |
90000 |
Drinking water facility1 |
Plinth level |
-
latitude : 22.9905832
Longitude : 86.8520501
file name : Image_12032024180143897.png
|
2024-03-12 18:01:43.967297 |
460 |
67376415 |
Drinking water facility |
90000 |
Drinking water facility1 |
Completion of work |
-
latitude : 22.99063377
Longitude : 86.85204458
file name : Image_06032024173544980.png
|
2024-03-06 17:35:45.060308 |
461 |
67375835 |
Drinking water facility |
90000 |
Drinking water facility1 |
Roof laid |
-
latitude : 23.0092577
Longitude : 86.84964528
file name : Image_12032024175021738.png
|
2024-03-12 17:50:21.802142 |
462 |
67375835 |
Drinking water facility |
90000 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.00923494
Longitude : 86.84962608
file name : Image_23022024153914058.png
|
2024-02-23 15:39:14.162993 |
463 |
67375835 |
Drinking water facility |
90000 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.00921122
Longitude : 86.84967745
file name : Image_22022024143535727.png
|
2024-02-22 14:35:35.821883 |
464 |
67375835 |
Drinking water facility |
90000 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.00920708
Longitude : 86.84968712
file name : Image_22022024143423606.png
|
2024-02-22 14:34:23.70361 |
465 |
67375437 |
Drinking water facility |
90000 |
Drinking water facility1 |
Roof laid |
-
latitude : 23.02399603
Longitude : 86.85053813
file name : Image_05032024122654317.png
|
2024-03-05 12:26:54.392472 |
466 |
67375437 |
Drinking water facility |
90000 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.024045
Longitude : 86.8499493
file name : Image_23022024155427321.png
|
2024-02-23 15:54:27.409306 |
467 |
67375437 |
Drinking water facility |
90000 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.0240446
Longitude : 86.8499495
file name : Image_22022024142015029.png
|
2024-02-22 14:20:15.131549 |
468 |
67375710 |
Drinking water facility |
90000 |
Drinking water facility1 |
Roof laid |
-
latitude : 23.02692921
Longitude : 86.84760902
file name : Image_05032024121438698.png
|
2024-03-05 12:14:38.774097 |
469 |
67375710 |
Drinking water facility |
90000 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.02693145
Longitude : 86.84758649
file name : Image_23022024155707733.png
|
2024-02-23 15:57:07.82102 |
470 |
67375710 |
Drinking water facility |
90000 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.02687072
Longitude : 86.84760403
file name : Image_22022024142244361.png
|
2024-02-22 14:22:44.448903 |
471 |
49260763 |
INSTALATION OF TUBE WELL AT SUPUR ICDS CENTRE INCL PLATFORM DRAIN SOCK PIT |
90000 |
INSTALATION OF TUBE WELL AT SUPUR ICDS CENTRE INCL PLATFORM DRAIN SOCK PIT1 |
Roof laid |
-
latitude : 23.01907152
Longitude : 86.87146998
file name : Image_22032024174036002.png
|
2024-03-22 17:40:36.070908 |
472 |
49260763 |
INSTALATION OF TUBE WELL AT SUPUR ICDS CENTRE INCL PLATFORM DRAIN SOCK PIT |
90000 |
INSTALATION OF TUBE WELL AT SUPUR ICDS CENTRE INCL PLATFORM DRAIN SOCK PIT1 |
Plinth level |
-
latitude : 23.01892605
Longitude : 86.87137176
file name : Image_13032024131344606.png
|
2024-03-13 13:13:44.675555 |
473 |
49260763 |
INSTALATION OF TUBE WELL AT SUPUR ICDS CENTRE INCL PLATFORM DRAIN SOCK PIT |
90000 |
INSTALATION OF TUBE WELL AT SUPUR ICDS CENTRE INCL PLATFORM DRAIN SOCK PIT1 |
Completion of work |
-
latitude : 23.01903802
Longitude : 86.87141627
file name : Image_12032024172401519.png
|
2024-03-12 17:24:01.59751 |
474 |
67397451 |
Construction of Sheds |
119000 |
Construction of Sheds1 |
Plinth level |
-
latitude : 23.02578956
Longitude : 86.85316496
file name : Image_22032024123638272.png
|
2024-03-22 12:36:38.46282 |
475 |
67397451 |
Construction of Sheds |
119000 |
Construction of Sheds1 |
Completion of work |
-
latitude : 23.02577814
Longitude : 86.85314523
file name : Image_12032024173559751.png
|
2024-03-12 17:35:59.829008 |
476 |
67433930 |
Drainage Construction |
210000 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.9716602
Longitude : 86.8498032
file name : Image_09112023163355983.png
|
2023-11-09 16:33:56.091216 |
477 |
67433930 |
Drainage Construction |
210000 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.98315052
Longitude : 86.85372724
file name : Image_08112023164645938.png
|
2023-11-08 16:46:46.038743 |
478 |
67377233 |
Construction of roads |
262368 |
Construction of roads1 |
Plinth level |
-
latitude : 23.02281965,23.02281965
Longitude : 86.85830894,86.85830894
file name : Image_22032024121134430.png
|
2024-03-22 12:11:34.594081 |
479 |
67377233 |
Construction of roads |
262368 |
Construction of roads1 |
Completion of work |
-
latitude : 23.02284186,23.02284037
Longitude : 86.85824179,86.858266
file name : Image_12032024173122506.png
|
2024-03-12 17:31:22.583325 |
480 |
67435241 |
Drainage Construction |
9150 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.00564666
Longitude : 86.87728221
file name : Image_29072024152654912.png
|
2024-07-29 15:26:54.985417 |
481 |
67435241 |
Drainage Construction |
9150 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.00563416
Longitude : 86.87732416
file name : Image_02072024155131161.png
|
2024-07-02 15:51:31.248263 |
482 |
67435241 |
Drainage Construction |
9150 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.00566871
Longitude : 86.87729946
file name : Image_26062024160126314.png
|
2024-06-26 16:01:26.374773 |
483 |
67435027 |
Drainage Construction |
9150 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.01503667
Longitude : 86.86449612
file name : Image_29072024144238218.png
|
2024-07-29 14:42:38.293761 |
484 |
67435027 |
Drainage Construction |
9150 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.01496525
Longitude : 86.86443932
file name : Image_02072024134837876.png
|
2024-07-02 13:48:37.947089 |
485 |
67435027 |
Drainage Construction |
9150 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.01500378
Longitude : 86.86450449
file name : Image_26062024154927954.png
|
2024-06-26 15:49:28.019737 |
486 |
67434973 |
Drainage Construction |
9150 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.01135261
Longitude : 86.86996081
file name : Image_29072024143946600.png
|
2024-07-29 14:39:46.669167 |
487 |
67434973 |
Drainage Construction |
9150 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.98548662
Longitude : 86.8901596
file name : Image_02072024134457436.png
|
2024-07-02 13:44:57.500745 |
488 |
67434973 |
Drainage Construction |
9150 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.01135753
Longitude : 86.86992329
file name : Image_26062024154508577.png
|
2024-06-26 15:45:08.661353 |
489 |
67435126 |
Drainage Construction |
9150 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.98516452
Longitude : 86.89023394
file name : Image_31072024101014713.png
|
2024-07-31 10:10:14.790164 |
490 |
67435126 |
Drainage Construction |
9150 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.98516452
Longitude : 86.89023394
file name : Image_31072024101009304.png
|
2024-07-31 10:10:09.379041 |
491 |
67435126 |
Drainage Construction |
9150 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.98514111
Longitude : 86.89018932
file name : Image_31072024101004292.png
|
2024-07-31 10:10:04.368551 |
492 |
67435126 |
Drainage Construction |
9150 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.98507255
Longitude : 86.89025258
file name : Image_29072024101237014.png
|
2024-07-29 10:12:37.091527 |
493 |
67435126 |
Drainage Construction |
9150 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.98514188
Longitude : 86.89025393
file name : Image_26062024162417110.png
|
2024-06-26 16:24:17.179328 |
494 |
67435321 |
Drainage Construction |
9150 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.0095593
Longitude : 86.8729319
file name : Image_29072024144956533.png
|
2024-07-29 14:49:56.600092 |
495 |
67435321 |
Drainage Construction |
9150 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.0095644
Longitude : 86.8729148
file name : Image_02072024134152610.png
|
2024-07-02 13:41:52.68133 |
496 |
67435321 |
Drainage Construction |
9150 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.00936591
Longitude : 86.87268929
file name : Image_26062024153943172.png
|
2024-06-26 15:39:43.560173 |
497 |
98096177 |
Creation of drainage channel for management of grey water |
177700 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.99843356
Longitude : 86.88613236
file name : Image_23092024121155359.png
|
2024-09-23 12:11:55.416677 |
498 |
98096177 |
Creation of drainage channel for management of grey water |
177700 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.99836019
Longitude : 86.88619571
file name : Image_21092024095506201.png
|
2024-09-21 09:55:06.261913 |
499 |
98096177 |
Creation of drainage channel for management of grey water |
177700 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.99840954
Longitude : 86.88602681
file name : Image_19092024114128479.png
|
2024-09-19 11:41:28.560483 |
500 |
68132779 |
Drinking water facility |
99900 |
Drinking water facility1 |
|
-
latitude : 23.0095802
Longitude : 86.8729206
file name : Image_04072024114632704.png
|
2024-07-04 11:46:32.763965 |
501 |
56688414 |
CONSTRACTION COMUNITY HALL AT KATABANI |
199610 |
CONSTRACTION COMUNITY HALL AT KATABANI 1 |
Plinth level |
-
latitude : 23.00621382
Longitude : 86.87945548
file name : Image_17102023110737974.png
|
2023-10-17 11:07:38.056253 |
502 |
56688414 |
CONSTRACTION COMUNITY HALL AT KATABANI |
199610 |
CONSTRACTION COMUNITY HALL AT KATABANI 1 |
Completion of work |
-
latitude : 23.0062966
Longitude : 86.87959496
file name : Image_30032023130316420.png
|
2023-03-30 13:03:16.530202 |
503 |
98102343 |
Construction of roads |
300180 |
Construction of roads1 |
Plinth level |
-
latitude : 23.01827639,23.01827638
Longitude : 86.90444697,86.90444698
file name : Image_21092024113232688.png
|
2024-09-21 11:32:32.755328 |
504 |
98102343 |
Construction of roads |
300180 |
Construction of roads1 |
Completion of work |
-
latitude : 23.01828784,23.01828839,23.01828839
Longitude : 86.90449435,86.90449243,86.90449243
file name : Image_09092024125541884.png
|
2024-09-09 12:55:41.957343 |
505 |
98102611 |
Construction of roads |
300000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.98871254,22.98871254,22.98871254
Longitude : 86.87785819,86.87785819,86.87785819
file name : Image_12092024131927305.png
|
2024-09-12 13:19:27.370304 |
506 |
98102611 |
Construction of roads |
300000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.01925231,23.01925234
Longitude : 86.87902062,86.87902067
file name : Image_09092024150007359.png
|
2024-09-09 15:00:07.431754 |
507 |
98102611 |
Construction of roads |
300000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.01924536,23.01924536,23.0192555
Longitude : 86.87911986,86.87911986,86.87900009
file name : Image_02092024134012398.png
|
2024-09-02 13:40:12.467932 |
508 |
97979210 |
Construction of Community Sanitary Complex |
150000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.00296002
Longitude : 86.86774521
file name : Image_02092024143527460.png
|
2024-09-02 14:35:27.551539 |
509 |
97979210 |
Construction of Community Sanitary Complex |
150000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.00289823
Longitude : 86.86773912
file name : Image_20082024141459711.png
|
2024-08-20 14:14:59.774937 |
510 |
97979210 |
Construction of Community Sanitary Complex |
150000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.00290862
Longitude : 86.86777132
file name : Image_30072024150324030.png
|
2024-07-30 15:03:24.097509 |
511 |
97985567 |
Construction of Community Sanitary Complex |
224000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.03040674
Longitude : 86.88393068
file name : Image_23092024131524574.png
|
2024-09-23 13:15:24.646777 |
512 |
97985567 |
Construction of Community Sanitary Complex |
224000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.03041315
Longitude : 86.88393558
file name : Image_09092024141924019.png
|
2024-09-09 14:19:24.085375 |
513 |
97985567 |
Construction of Community Sanitary Complex |
224000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.03040571
Longitude : 86.88382479
file name : Image_02092024131121952.png
|
2024-09-02 13:11:22.027722 |
514 |
56727068 |
Construction of community toilet at kharban more |
201522 |
Construction of community toilet at kharban more1 |
Roof laid |
-
latitude : 22.9923673
Longitude : 86.83665539
file name : Image_23102024123737585.png
|
2024-10-23 12:37:37.650915 |
515 |
56727068 |
Construction of community toilet at kharban more |
201522 |
Construction of community toilet at kharban more1 |
Plinth level |
-
latitude : 22.99237064
Longitude : 86.83660687
file name : Image_08102024115753785.png
|
2024-10-08 11:57:53.846147 |
516 |
56727068 |
Construction of community toilet at kharban more |
201522 |
Construction of community toilet at kharban more1 |
Completion of work |
-
latitude : 22.99222694
Longitude : 86.83645503
file name : Image_30032023150637832.png
|
2023-03-30 15:06:37.939425 |
517 |
98106524 |
Electric connection |
300000 |
Electric connection1 |
|
-
latitude : 23.00960814
Longitude : 86.87289632
file name : Image_08082024122530395.png
|
2024-08-08 12:25:30.470542 |
518 |
97957195 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.98516645
Longitude : 86.8902314
file name : Image_08082024100548603.png
|
2024-08-08 10:05:48.674721 |
519 |
97957195 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.98504129
Longitude : 86.89024339
file name : Image_07082024134237212.png
|
2024-08-07 13:42:37.285983 |
520 |
97634341 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.98537159
Longitude : 86.87167701
file name : Image_09092024135225341.png
|
2024-09-09 13:52:25.412548 |
521 |
97634341 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.98534459
Longitude : 86.87161391
file name : Image_03092024080815197.png
|
2024-09-03 08:08:15.303338 |
522 |
97964584 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.02375825
Longitude : 86.86087409
file name : Image_09092024143144570.png
|
2024-09-09 14:31:44.649203 |
523 |
97964584 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.02372234
Longitude : 86.86074709
file name : Image_02092024132117270.png
|
2024-09-02 13:21:17.339562 |
524 |
97964584 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.02375004
Longitude : 86.86081974
file name : Image_29082024132019394.png
|
2024-08-29 13:20:19.717937 |
525 |
97638578 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.00235892
Longitude : 86.86888713
file name : Image_09092024140124904.png
|
2024-09-09 14:01:24.976207 |
526 |
97638578 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.00226255
Longitude : 86.86880785
file name : Image_02092024143123468.png
|
2024-09-02 14:31:23.560913 |
527 |
97638578 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.00235568
Longitude : 86.86883434
file name : Image_29082024140735728.png
|
2024-08-29 14:07:35.874619 |
528 |
97970802 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.98527996
Longitude : 86.89039443
file name : Image_10092024172830055.png
|
2024-09-10 17:28:33.623043 |
529 |
97970802 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.00281826
Longitude : 86.85717323
file name : Image_02092024125748001.png
|
2024-09-02 12:57:48.076089 |
530 |
97970802 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.00282815
Longitude : 86.8573754
file name : Image_29082024165219106.png
|
2024-08-29 16:52:19.853703 |
531 |
97975775 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.0242089
Longitude : 86.88997241
file name : Image_09092024150644887.png
|
2024-09-09 15:06:44.961706 |
532 |
97975775 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.02419128
Longitude : 86.8899941
file name : Image_02092024134850124.png
|
2024-09-02 13:48:50.19699 |
533 |
97975775 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.02415616
Longitude : 86.88994018
file name : Image_29082024135020868.png
|
2024-08-29 13:50:21.595321 |
534 |
98104466 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Roof laid |
-
latitude : 23.0023646
Longitude : 86.8725942
file name : Image_29082024140323254.png
|
2024-08-29 14:03:23.357878 |
535 |
98104466 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.0023113
Longitude : 86.87248458
file name : Image_22082024114839473.png
|
2024-08-22 11:48:39.547773 |
536 |
98104466 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.00228029
Longitude : 86.87254281
file name : Image_20082024140759007.png
|
2024-08-20 14:07:59.071289 |
537 |
98105508 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Roof laid |
-
latitude : 23.00260704
Longitude : 86.86918789
file name : Image_29082024140652181.png
|
2024-08-29 14:06:52.317733 |
538 |
98105508 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.00256461
Longitude : 86.86913899
file name : Image_21082024121601903.png
|
2024-08-21 12:16:02.010451 |
539 |
98105508 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.00250126
Longitude : 86.86919072
file name : Image_20082024141040098.png
|
2024-08-20 14:10:40.164749 |
540 |
98105756 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Roof laid |
-
latitude : 23.02181652
Longitude : 86.85328664
file name : Image_29082024130057765.png
|
2024-08-29 13:00:58.630463 |
541 |
98105756 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.02187943
Longitude : 86.85313935
file name : Image_21082024114056698.png
|
2024-08-21 11:40:56.775116 |
542 |
98105756 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.02194063
Longitude : 86.85317727
file name : Image_20082024142828351.png
|
2024-08-20 14:28:28.417581 |
543 |
67724053 |
Electricity/Solar Power Installation |
31750 |
Electricity/Solar Power Installation1 |
Roof laid |
-
latitude : 22.98507697
Longitude : 86.89014433
file name : Image_29082024125658779.png
|
2024-08-29 12:56:59.581358 |
544 |
67724053 |
Electricity/Solar Power Installation |
31750 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 23.01856873
Longitude : 86.8590892
file name : Image_21082024113515871.png
|
2024-08-21 11:35:15.941877 |
545 |
67724053 |
Electricity/Solar Power Installation |
31750 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 23.01868999
Longitude : 86.85917492
file name : Image_12032024174356540.png
|
2024-03-12 17:43:56.597189 |
546 |
67724685 |
Electricity/Solar Power Installation |
31750 |
Electricity/Solar Power Installation1 |
Roof laid |
-
latitude : 22.990072
Longitude : 86.8528806
file name : Image_28082024071337335.png
|
2024-08-28 07:13:37.578958 |
547 |
67724685 |
Electricity/Solar Power Installation |
31750 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 23.009692
Longitude : 86.87272759
file name : Image_22082024080757350.png
|
2024-08-22 08:07:57.41366 |
548 |
67724685 |
Electricity/Solar Power Installation |
31750 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 22.99033423
Longitude : 86.85296814
file name : Image_12032024181426596.png
|
2024-03-12 18:14:26.672964 |