1 |
34819788 |
TUBEWELL AT FP SCHOOL NEAR DURGAMANDIR |
60000 |
TUBEWELL AT FP SCHOOL NEAR DURGAMANDIR1 |
Completion of work |
-
latitude : 23.39606128167361
Longitude : 87.58195018395782
file name : Image_24022021202744060.png
|
2021-02-24 20:27:44.157496 |
2 |
34821924 |
TUBEWELL AT SIHIGRAM |
60000 |
TUBEWELL AT SIHIGRAM1 |
Completion of work |
-
latitude : 23.363522817380726
Longitude : 87.57740308530629
file name : Image_17032021140739828.png
|
2021-03-17 14:07:39.919333 |
3 |
34821924 |
TUBEWELL AT SIHIGRAM |
60000 |
TUBEWELL AT SIHIGRAM1 |
Completion of work |
-
latitude : 23.36360148154199
Longitude : 87.57737525738776
file name : Image_17032021140655957.png
|
2021-03-17 14:06:56.053554 |
4 |
34831217 |
TUBEWELL AT PARAJ NEAR RAJKUMAR ACHRAYA HOUSE |
60000 |
TUBEWELL AT PARAJ NEAR RAJKUMAR ACHRAYA HOUSE1 |
Completion of work |
-
latitude : 23.366287839598954
Longitude : 87.60794112458825
file name : Image_17032021140547141.png
|
2021-03-17 14:05:47.223278 |
5 |
34831217 |
TUBEWELL AT PARAJ NEAR RAJKUMAR ACHRAYA HOUSE |
60000 |
TUBEWELL AT PARAJ NEAR RAJKUMAR ACHRAYA HOUSE1 |
Completion of work |
-
latitude : 23.366229250095785
Longitude : 87.60796501301229
file name : Image_24022021124546290.png
|
2021-02-24 12:45:46.400775 |
6 |
34831958 |
TUBEWELL AT PARAJ MUCHIPARA |
60000 |
TUBEWELL AT PARAJ MUCHIPARA1 |
Plinth level |
-
latitude : 23.37274798192084
Longitude : 87.60422266088426
file name : Image_22112021114621976.png
|
2021-11-22 11:46:22.089552 |
7 |
34831958 |
TUBEWELL AT PARAJ MUCHIPARA |
60000 |
TUBEWELL AT PARAJ MUCHIPARA1 |
Completion of work |
-
latitude : 23.372656870633364
Longitude : 87.60425258427858
file name : Image_22112021114303343.png
|
2021-11-22 11:43:03.455893 |
8 |
34923107 |
REPARING OF OLD TUBEWELL ALL SANSAD |
300000 |
REPARING OF OLD TUBEWELL ALL SANSAD1 |
Completion of work |
-
latitude : 23.3661896456033
Longitude : 87.60076428763568
file name : Image_10032022145904714.png
|
2022-03-10 14:59:04.832663 |
9 |
68784192 |
Construction of roads |
260000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.382017486728728,23.382017486728728
Longitude : 87.57599920034409,87.57599920034409
file name : Image_04042024134501586.png
|
2024-04-04 13:45:01.678091 |
10 |
68784192 |
Construction of roads |
260000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.38196807540953,23.381962082348764
Longitude : 87.57595519535244,87.5759448017925
file name : Image_04042024134308911.png
|
2024-04-04 13:43:08.98415 |
11 |
68784192 |
Construction of roads |
260000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.382056043483317,23.382063126191497
Longitude : 87.57599744014442,87.57598386146128
file name : Image_04042024133659296.png
|
2024-04-04 13:36:59.409923 |
12 |
49005577 |
CONSTRUTUION OF PUCCA DRAIN WITH COVER FROM IRCHARAN MUKHARJEE JAMI TO DULAL HOUSE AT KARAKDAL |
798046 |
CONSTRUTUION OF PUCCA DRAIN WITH COVER FROM IRCHARAN MUKHARJEE JAMI TO DULAL HOUSE AT KARAKDAL1 |
Roof laid |
-
latitude : 23.35242689587176,23.352448856458068
Longitude : 87.5922308396548,87.59223503060639
file name : Image_16092023124351103.png
|
2023-09-16 12:43:51.204849 |
13 |
49005577 |
CONSTRUTUION OF PUCCA DRAIN WITH COVER FROM IRCHARAN MUKHARJEE JAMI TO DULAL HOUSE AT KARAKDAL |
798046 |
CONSTRUTUION OF PUCCA DRAIN WITH COVER FROM IRCHARAN MUKHARJEE JAMI TO DULAL HOUSE AT KARAKDAL1 |
Plinth level |
-
latitude : 23.35240250453353,23.352402043528855
Longitude : 87.5931375939399,87.59313776157796
file name : Image_22112022085914346.png
|
2022-11-22 08:59:14.755956 |
14 |
49005577 |
CONSTRUTUION OF PUCCA DRAIN WITH COVER FROM IRCHARAN MUKHARJEE JAMI TO DULAL HOUSE AT KARAKDAL |
798046 |
CONSTRUTUION OF PUCCA DRAIN WITH COVER FROM IRCHARAN MUKHARJEE JAMI TO DULAL HOUSE AT KARAKDAL1 |
Completion of work |
-
latitude : 23.352541183121502,23.352541183121502
Longitude : 87.59267524816096,87.59267524816096
file name : Image_22112022085404783.png
|
2022-11-22 08:54:05.199423 |
15 |
49057086 |
REPARING AND MAINTAINANS OF TUBEWELL FROM SANSAD NO -PARAJGP-X,XI,XII,XIII,XIV,XV,XVI,XVII,XVIII,XIX |
500000 |
REPARING AND MAINTAINANS OF TUBEWELL FROM SANSAD NO -PARAJGP-X,XI,XII,XIII,XIV,XV,XVI,XVII,XVIII,XIX1 |
Completion of work |
-
latitude : 23.36657906882465
Longitude : 87.60070175863802
file name : Image_08122022124430202.png
|
2022-12-08 12:44:30.298626 |
16 |
49006385 |
REPARING AND MAINTAINANS OF TUBEWELL FROM SANSAD NO -PARAJ-I,II,III,IV,V,VI,VII,VIII,IX |
500000 |
REPARING AND MAINTAINANS OF TUBEWELL FROM SANSAD NO -PARAJ-I,II,III,IV,V,VI,VII,VIII,IX1 |
Completion of work |
-
latitude : 23.366389512084424
Longitude : 87.6008547283709
file name : Image_08122022124235225.png
|
2022-12-08 12:42:35.316358 |
17 |
49006385 |
REPARING AND MAINTAINANS OF TUBEWELL FROM SANSAD NO -PARAJ-I,II,III,IV,V,VI,VII,VIII,IX |
500000 |
REPARING AND MAINTAINANS OF TUBEWELL FROM SANSAD NO -PARAJ-I,II,III,IV,V,VI,VII,VIII,IX1 |
Completion of work |
-
latitude : 23.3668659
Longitude : 87.6021284
file name : Image_20072022162709070.png
|
2022-07-20 16:27:09.157165 |
18 |
58568326 |
CONSTRUCTION OF FOOTBALL GALLERY AT JAGULIPARA |
349100 |
CONSTRUCTION OF FOOTBALL GALLERY AT JAGULIPARA1 |
Plinth level |
-
latitude : 23.3410283
Longitude : 87.5959174
file name : Image_11102023162803788.png
|
2023-10-11 16:28:03.866522 |
19 |
58568326 |
CONSTRUCTION OF FOOTBALL GALLERY AT JAGULIPARA |
349100 |
CONSTRUCTION OF FOOTBALL GALLERY AT JAGULIPARA1 |
Completion of work |
-
latitude : 23.340232484042645
Longitude : 87.59474809281528
file name : Image_06032023080258236.png
|
2023-03-06 08:02:58.32508 |
20 |
58568326 |
CONSTRUCTION OF FOOTBALL GALLERY AT JAGULIPARA |
349100 |
CONSTRUCTION OF FOOTBALL GALLERY AT JAGULIPARA1 |
Completion of work |
-
latitude : 23.340232484042645
Longitude : 87.59474809281528
file name : Image_06032023080315139.png
|
2023-03-06 08:03:15.222655 |
21 |
58566117 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM HATEM MONDAL HOUSE TO JAHAR HOUSE AT PARAJ |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM HATEM MONDAL HOUSE TO JAHAR HOUSE AT PARAJ1 |
Roof laid |
-
latitude : 23.366644866764545,23.366644866764545
Longitude : 87.60512279346585,87.60512279346585
file name : Image_16092023102232852.png
|
2023-09-16 10:22:32.951532 |
22 |
58566117 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM HATEM MONDAL HOUSE TO JAHAR HOUSE AT PARAJ |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM HATEM MONDAL HOUSE TO JAHAR HOUSE AT PARAJ1 |
Plinth level |
-
latitude : 23.3666497701779,23.3666497701779
Longitude : 87.6051028445363,87.6051028445363
file name : Image_16092023101934766.png
|
2023-09-16 10:19:34.880912 |
23 |
58566117 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM HATEM MONDAL HOUSE TO JAHAR HOUSE AT PARAJ |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM HATEM MONDAL HOUSE TO JAHAR HOUSE AT PARAJ1 |
Completion of work |
-
latitude : 23.366625546477735,23.366625546477735
Longitude : 87.60505238547921,87.60505238547921
file name : Image_23022023113645532.png
|
2023-02-23 11:36:45.62853 |
24 |
34810936 |
TUBEWELL AT KHANPARA |
60000 |
TUBEWELL AT KHANPARA1 |
Completion of work |
-
latitude : 23.40525195468217
Longitude : 87.58099338971078
file name : Image_10032021114418062.png
|
2021-03-10 11:44:18.182702 |
25 |
34810936 |
TUBEWELL AT KHANPARA |
60000 |
TUBEWELL AT KHANPARA1 |
Completion of work |
-
latitude : 23.40509818866849
Longitude : 87.58094661869109
file name : Image_07032021101431887.png
|
2021-03-07 10:14:31.970945 |
26 |
34820728 |
TUBEWELL AT RAKONA |
60000 |
TUBEWELL AT RAKONA1 |
Completion of work |
-
latitude : 23.38585451245308
Longitude : 87.59084162302315
file name : Image_12032021163043916.png
|
2021-03-12 16:30:44.008078 |
27 |
34820728 |
TUBEWELL AT RAKONA |
60000 |
TUBEWELL AT RAKONA1 |
Plinth level |
-
latitude : 23.38597135618329
Longitude : 87.59085679426789
file name : Image_28032021132605635.png
|
2021-03-28 13:26:05.734942 |
28 |
34820728 |
TUBEWELL AT RAKONA |
60000 |
TUBEWELL AT RAKONA1 |
Completion of work |
-
latitude : 23.385940468870103
Longitude : 87.59086106903851
file name : Image_25022021123419342.png
|
2021-02-25 12:34:19.430737 |
29 |
34820728 |
TUBEWELL AT RAKONA |
60000 |
TUBEWELL AT RAKONA1 |
Completion of work |
-
latitude : 23.38562836870551
Longitude : 87.59073726832867
file name : Image_24022021202925911.png
|
2021-02-24 20:29:26.008115 |
30 |
34820237 |
TUBEWELL AT KONDAIPUR ADIBASIPARA |
60000 |
TUBEWELL AT KONDAIPUR ADIBASIPARA1 |
Completion of work |
-
latitude : 23.408937728963792
Longitude : 87.59782156907022
file name : Image_18032021152302111.png
|
2021-03-18 15:23:02.288188 |
31 |
34820237 |
TUBEWELL AT KONDAIPUR ADIBASIPARA |
60000 |
TUBEWELL AT KONDAIPUR ADIBASIPARA1 |
Completion of work |
-
latitude : 23.40829865075648
Longitude : 87.596015939489
file name : Image_24022021202802656.png
|
2021-02-24 20:28:02.744808 |
32 |
34916662 |
TUBEWELL AT PARAJ SDANSAD NO X |
54978 |
TUBEWELL AT PARAJ SDANSAD NO X1 |
Plinth level |
-
latitude : 23.365949587896466
Longitude : 87.60145881213248
file name : Image_22112021113100941.png
|
2021-11-22 11:31:01.044625 |
33 |
34916662 |
TUBEWELL AT PARAJ SDANSAD NO X |
54978 |
TUBEWELL AT PARAJ SDANSAD NO X1 |
Completion of work |
-
latitude : 23.365921089425683
Longitude : 87.60148513130844
file name : Image_22112021112715719.png
|
2021-11-22 11:27:15.854586 |
34 |
34648170 |
PARAJ BALIKA PARIMARY SCHOOL TO DHANA HOUSE DRAIN |
101313 |
PARAJ BALIKA PARIMARY SCHOOL TO DHANA HOUSE DRAIN1 |
Completion of work |
-
latitude : 23.368176240473986,23.368176240473986
Longitude : 87.60635560378432,87.60635560378432
file name : Image_27022021103520652.png
|
2021-02-27 10:35:20.750431 |
35 |
34821154 |
TUBEWELL AT SIMNORI |
60000 |
TUBEWELL AT SIMNORI1 |
Plinth level |
-
latitude : 23.371684444136918
Longitude : 87.57585343904793
file name : Image_10052021161800406.png
|
2021-05-10 16:18:00.511443 |
36 |
34821154 |
TUBEWELL AT SIMNORI |
60000 |
TUBEWELL AT SIMNORI1 |
Completion of work |
-
latitude : 23.381760413758457
Longitude : 87.57479153573513
file name : Image_24022021202818185.png
|
2021-02-24 20:28:18.277279 |
37 |
34821609 |
TUBEWELL AT SIMNORI |
60000 |
TUBEWELL AT SIMNORI1 |
Plinth level |
-
latitude : 23.38221253361553
Longitude : 87.57402174174786
file name : Image_10052021161803742.png
|
2021-05-10 16:18:03.837537 |
38 |
34821609 |
TUBEWELL AT SIMNORI |
60000 |
TUBEWELL AT SIMNORI1 |
Completion of work |
-
latitude : 23.371688718907535
Longitude : 87.57597715593874
file name : Image_24022021202845878.png
|
2021-02-24 20:28:45.976973 |
39 |
34827248 |
TUBEWELL AT NEAR BAGDIPARA AWC |
60000 |
TUBEWELL AT NEAR BAGDIPARA AWC 1 |
Completion of work |
-
latitude : 23.393483008258045
Longitude : 87.60150030255318
file name : Image_05102021173033584.png
|
2021-10-05 17:30:33.693115 |
40 |
39055332 |
KHURAJ DRAIN FROM CHATAR TO AGUNJHAMARA |
500000 |
KHURAJ DRAIN FROM CHATAR TO AGUNJHAMARA1 |
Plinth level |
-
latitude : 23.350595575757325,23.35059582721442
Longitude : 87.61621272191405,87.61620584875345
file name : Image_28032021132610924.png
|
2021-03-28 13:26:11.016612 |
41 |
39055332 |
KHURAJ DRAIN FROM CHATAR TO AGUNJHAMARA |
500000 |
KHURAJ DRAIN FROM CHATAR TO AGUNJHAMARA1 |
Completion of work |
-
latitude : 23.350495076738298,23.35042684804648
Longitude : 87.61619746685028,87.61617634445429
file name : Image_27022021103525180.png
|
2021-02-27 10:35:25.271619 |
42 |
34829263 |
TUBEWELL AT BHIMSARA SAYERER NICHE |
60000 |
TUBEWELL AT BHIMSARA SAYERER NICHE1 |
Completion of work |
-
latitude : 23.355618556961417
Longitude : 87.58239325135946
file name : Image_10032021160954353.png
|
2021-03-10 16:09:54.44086 |
43 |
34829263 |
TUBEWELL AT BHIMSARA SAYERER NICHE |
60000 |
TUBEWELL AT BHIMSARA SAYERER NICHE1 |
Completion of work |
-
latitude : 23.35558352060616
Longitude : 87.58231622166932
file name : Image_27022021103511545.png
|
2021-02-27 10:35:11.67018 |
44 |
34669711 |
PARAJ MOSTAFA HOUSE TO NASU HOUSE ROAD WITH DRAIN |
400000 |
PARAJ MOSTAFA HOUSE TO NASU HOUSE ROAD WITH DRAIN1 |
Completion of work |
-
latitude : 23.3702485403046,23.370256084017456
Longitude : 87.60193976573646,87.60193557478487
file name : Image_24022021202714854.png
|
2021-02-24 20:27:14.936711 |
45 |
39075686 |
PARAJ JAHAR HOUSE TO SANKO DRAIN |
420000 |
PARAJ JAHAR HOUSE TO SANKO DRAIN1 |
Completion of work |
-
latitude : 23.36610415019095,23.366099330596626
Longitude : 87.6043850183487,87.60438325814903
file name : Image_24022021202645660.png
|
2021-02-24 20:26:45.753746 |
46 |
34808772 |
SUBMERCIABLE WITH WATER TANK AT JAGULIPARA |
500000 |
SUBMERCIABLE WITH WATER TANK AT JAGULIPARA1 |
Plinth level |
-
latitude : 23.34148201625794
Longitude : 87.59975594468415
file name : Image_10052021161814399.png
|
2021-05-10 16:18:14.498028 |
47 |
34808772 |
SUBMERCIABLE WITH WATER TANK AT JAGULIPARA |
500000 |
SUBMERCIABLE WITH WATER TANK AT JAGULIPARA1 |
Completion of work |
-
latitude : 23.340700613334775
Longitude : 87.59968838654459
file name : Image_25022021111741984.png
|
2021-02-25 11:17:39.358108 |
48 |
39055322 |
SUBMERCIABLE WITH TANK AT KORAKDAL |
500000 |
SUBMERCIABLE WITH TANK AT KORAKDAL1 |
Plinth level |
-
latitude : 23.35246805101633
Longitude : 87.592643648386
file name : Image_10052021161807380.png
|
2021-05-10 16:18:07.469881 |
49 |
39055322 |
SUBMERCIABLE WITH TANK AT KORAKDAL |
500000 |
SUBMERCIABLE WITH TANK AT KORAKDAL1 |
Completion of work |
-
latitude : 23.35251498967409
Longitude : 87.59262881241739
file name : Image_25022021174515395.png
|
2021-02-25 17:45:15.503091 |
50 |
34808149 |
SUBMERCIABLE WITH WATER TANK AT BOLPUR |
500000 |
SUBMERCIABLE WITH WATER TANK AT BOLPUR1 |
Plinth level |
-
latitude : 23.35947196930647
Longitude : 87.59432044811547
file name : Image_10052021161810814.png
|
2021-05-10 16:18:10.903708 |
51 |
34808149 |
SUBMERCIABLE WITH WATER TANK AT BOLPUR |
500000 |
SUBMERCIABLE WITH WATER TANK AT BOLPUR1 |
Completion of work |
-
latitude : 23.35947234649211
Longitude : 87.59435280226171
file name : Image_27022021103516220.png
|
2021-02-27 10:35:16.333501 |
52 |
34813115 |
TUBEWELL AT KHAMARGRAM |
60000 |
TUBEWELL AT KHAMARGRAM1 |
Roof laid |
-
latitude : 23.404746525920928
Longitude : 87.5777152273804
file name : Image_03122021153439601.png
|
2021-12-03 15:34:39.704527 |
53 |
34813115 |
TUBEWELL AT KHAMARGRAM |
60000 |
TUBEWELL AT KHAMARGRAM1 |
Plinth level |
-
latitude : 23.404798954725266
Longitude : 87.57774565368891
file name : Image_03122021153332944.png
|
2021-12-03 15:33:33.059685 |
54 |
34813115 |
TUBEWELL AT KHAMARGRAM |
60000 |
TUBEWELL AT KHAMARGRAM1 |
Completion of work |
-
latitude : 23.404771336354315
Longitude : 87.57771933451295
file name : Image_03122021153153943.png
|
2021-12-03 15:31:54.064559 |
55 |
39055415 |
JHARUL MANASATALA TO KALI TALA CC ROAD |
250000 |
JHARUL MANASATALA TO KALI TALA CC ROAD1 |
Completion of work |
-
latitude : 23.39345828164369,23.393437955528498
Longitude : 87.60080443695188,87.60079253464937
file name : Image_05102021173126046.png
|
2021-10-05 17:31:26.149456 |
56 |
34916993 |
TUBEWELL AT PARAJ SDANSAD NO XI |
60000 |
TUBEWELL AT PARAJ SDANSAD NO XI1 |
Plinth level |
-
latitude : 23.371108565479517
Longitude : 87.60230320505798
file name : Image_22112021113801666.png
|
2021-11-22 11:38:01.784586 |
57 |
34916993 |
TUBEWELL AT PARAJ SDANSAD NO XI |
60000 |
TUBEWELL AT PARAJ SDANSAD NO XI1 |
Completion of work |
-
latitude : 23.371158144436777
Longitude : 87.60216875933111
file name : Image_22112021113519128.png
|
2021-11-22 11:35:19.250059 |
58 |
34830101 |
TUBEWELL AT KORAKDAL KALITALA |
60000 |
TUBEWELL AT KORAKDAL KALITALA1 |
Completion of work |
-
latitude : 23.35415260400623
Longitude : 87.59307028725743
file name : Image_27122021110744069.png
|
2021-12-27 11:07:44.154148 |
59 |
34832344 |
TUBEWELL AT 166 AWC CENTRE AT KHURAJ |
60000 |
TUBEWELL AT 166 AWC CENTRE AT KHURAJ1 |
Completion of work |
-
latitude : 23.350251205265522
Longitude : 87.6143882330507
file name : Image_27122021085932147.png
|
2021-12-27 08:59:32.290856 |
60 |
34829533 |
TUBEWELL AT BOLPUR SWANSANGHAT |
60000 |
TUBEWELL AT BOLPUR SWANSANGHAT1 |
Completion of work |
-
latitude : 23.358376286923885
Longitude : 87.59240903891623
file name : Image_27122021110746821.png
|
2021-12-27 11:07:46.915123 |
61 |
34832754 |
TUBEWELL NEAR RIYASAT MOLLA HOUSE AT JAGULIPARA |
60000 |
TUBEWELL NEAR RIYASAT MOLLA HOUSE AT JAGULIPARA1 |
Plinth level |
-
latitude : 23.342275614850223
Longitude : 87.59593119844794
file name : Image_04122021094311058.png
|
2021-12-04 09:43:11.165172 |
62 |
34832754 |
TUBEWELL NEAR RIYASAT MOLLA HOUSE AT JAGULIPARA |
60000 |
TUBEWELL NEAR RIYASAT MOLLA HOUSE AT JAGULIPARA1 |
Completion of work |
-
latitude : 23.342268615961075
Longitude : 87.59602842852473
file name : Image_30112021125710296.png
|
2021-11-30 12:57:10.429025 |
63 |
34833089 |
TUBEWELL NEAR LAT SHOP AT JAGULIPARA |
60000 |
TUBEWELL NEAR LAT SHOP AT JAGULIPARA1 |
Completion of work |
-
latitude : 23.339817076921463
Longitude : 87.59642019867897
file name : Image_27122021085950504.png
|
2021-12-27 08:59:50.63237 |
64 |
34829080 |
TUBEWELL AT RANADI ATUSE PARE |
60000 |
TUBEWELL AT RANADI ATUSE PARE1 |
Completion of work |
-
latitude : 23.3809386
Longitude : 87.6000908
file name : Image_22112021103913760.png
|
2021-11-22 10:39:13.883997 |
65 |
34831664 |
TUBEWELL AT FAKIR BAGDI HOUSE |
60000 |
TUBEWELL AT FAKIR BAGDI HOUSE1 |
Plinth level |
-
latitude : 23.36912582628429
Longitude : 87.60941231623292
file name : Image_22112021115403095.png
|
2021-11-22 11:54:03.20805 |
66 |
34831664 |
TUBEWELL AT FAKIR BAGDI HOUSE |
60000 |
TUBEWELL AT FAKIR BAGDI HOUSE1 |
Completion of work |
-
latitude : 23.369235335849226
Longitude : 87.60945900343359
file name : Image_22112021115028304.png
|
2021-11-22 11:50:28.429407 |
67 |
39055175 |
SUBMERCIABLE WITH TANK AT NURKONA |
500000 |
SUBMERCIABLE WITH TANK AT NURKONA1 |
Plinth level |
-
latitude : 23.39538402389735
Longitude : 87.58001153357327
file name : Image_26112021151544484.png
|
2021-11-26 15:15:44.615564 |
68 |
39055175 |
SUBMERCIABLE WITH TANK AT NURKONA |
500000 |
SUBMERCIABLE WITH TANK AT NURKONA1 |
Completion of work |
-
latitude : 23.39538796339184
Longitude : 87.57995093241334
file name : Image_26112021151434796.png
|
2021-11-26 15:14:34.944344 |
69 |
34651779 |
KHANPARA JAKIR HOUSE TO BABLU HOUSE PCC ROAD |
250000 |
KHANPARA JAKIR HOUSE TO BABLU HOUSE PCC ROAD1 |
Completion of work |
-
latitude : 23.402843289077282,23.402830129489303
Longitude : 87.58375170640647,87.58373360149562
file name : Image_24022022113616229.png
|
2022-02-24 11:36:16.347209 |
70 |
39055216 |
SUBMERCIABLE WITH TANK AT JHARUL ADIBASIPARA |
500000 |
SUBMERCIABLE WITH TANK AT JHARUL ADIBASIPARA1 |
Roof laid |
-
latitude : 23.399326661601663
Longitude : 87.60336762294173
file name : Image_02022022132858700.png
|
2022-02-02 13:28:58.814404 |
71 |
39055216 |
SUBMERCIABLE WITH TANK AT JHARUL ADIBASIPARA |
500000 |
SUBMERCIABLE WITH TANK AT JHARUL ADIBASIPARA1 |
Plinth level |
-
latitude : 23.39928873348981
Longitude : 87.60341539978981
file name : Image_02022022132357453.png
|
2022-02-02 13:23:57.677655 |
72 |
39055216 |
SUBMERCIABLE WITH TANK AT JHARUL ADIBASIPARA |
500000 |
SUBMERCIABLE WITH TANK AT JHARUL ADIBASIPARA1 |
Completion of work |
-
latitude : 23.399313292466104
Longitude : 87.60334524326026
file name : Image_05102021173134095.png
|
2021-10-05 17:31:34.1979 |
73 |
34653437 |
RAKONA NANDALAL HOUSE TO ADHIR HOUSE ROAD |
300000 |
RAKONA NANDALAL HOUSE TO ADHIR HOUSE ROAD1 |
Plinth level |
-
latitude : 23.386941351927817,23.386937538161874
Longitude : 87.59071472100914,87.5907386932522
file name : Image_15022022165504097.png
|
2022-02-15 16:55:04.209916 |
74 |
34653437 |
RAKONA NANDALAL HOUSE TO ADHIR HOUSE ROAD |
300000 |
RAKONA NANDALAL HOUSE TO ADHIR HOUSE ROAD1 |
Completion of work |
-
latitude : 23.386781592853367,23.386765960603952
Longitude : 87.59072452783585,87.59071413427591
file name : Image_24122021134614032.png
|
2021-12-24 13:46:14.151745 |
75 |
34646354 |
SIMNORI SANSAD VI MASJIDTALA TO RAJIV HOUSE DRAIN |
500000 |
SIMNORI SANSAD VI MASJIDTALA TO RAJIV HOUSE DRAIN1 |
Completion of work |
-
latitude : 23.373711314052343,23.373735495842993
Longitude : 87.57375184446573,87.57377900183201
file name : Image_24122021130847853.png
|
2021-12-24 13:08:47.949542 |
76 |
34646354 |
SIMNORI SANSAD VI MASJIDTALA TO RAJIV HOUSE DRAIN |
500000 |
SIMNORI SANSAD VI MASJIDTALA TO RAJIV HOUSE DRAIN1 |
Plinth level |
-
latitude : 23.373687509447336,23.373688221909106
Longitude : 87.57401109673083,87.57401553913951
file name : Image_24122021131126627.png
|
2021-12-24 13:11:26.727496 |
77 |
34646354 |
SIMNORI SANSAD VI MASJIDTALA TO RAJIV HOUSE DRAIN |
500000 |
SIMNORI SANSAD VI MASJIDTALA TO RAJIV HOUSE DRAIN1 |
Completion of work |
-
latitude : 23.373766425065696,23.373758755624294
Longitude : 87.57375603541732,87.57375452667475
file name : Image_24122021130851342.png
|
2021-12-24 13:08:51.434232 |
78 |
34646894 |
JAGULIPARA ISRIAEL HOUSE TO NATUNPUKUR DRAIN |
450000 |
JAGULIPARA ISRIAEL HOUSE TO NATUNPUKUR DRAIN1 |
Completion of work |
-
latitude : 23.338671773672104,23.338745199143887
Longitude : 87.59588518179953,87.59588065557182
file name : Image_27122021085941707.png
|
2021-12-27 08:59:41.819672 |
79 |
39055257 |
SIMNORI DRAIN FROM SIMNORI NAGURIPUKUR TO A GARAI |
500000 |
SIMNORI DRAIN FROM SIMNORI NAGURIPUKUR TO A GARAI1 |
Completion of work |
-
latitude : 23.3802138,23.3802138
Longitude : 87.5752685,87.5752685
file name : Image_24122021132127012.png
|
2021-12-24 13:21:27.133837 |
80 |
39080285 |
MANIKBAZAR HARINAMTALA CULVERT |
80000 |
MANIKBAZAR HARINAMTALA CULVERT1 |
Completion of work |
-
latitude : 23.381308
Longitude : 87.5977215
file name : Image_15022022164204797.png
|
2022-02-15 16:42:04.90094 |
81 |
34805717 |
RAKONA BAGDIPARA 96 NO AWC REPARING |
300000 |
RAKONA BAGDIPARA 96 NO AWC REPARING1 |
Plinth level |
-
latitude : 23.38840298820287
Longitude : 87.59398089721799
file name : Image_24122021135115017.png
|
2021-12-24 13:51:15.122805 |
82 |
34805717 |
RAKONA BAGDIPARA 96 NO AWC REPARING |
300000 |
RAKONA BAGDIPARA 96 NO AWC REPARING1 |
Completion of work |
-
latitude : 23.38841036427766
Longitude : 87.59399841539562
file name : Image_22112021103908324.png
|
2021-11-22 10:39:08.442742 |
83 |
34926208 |
REPARING OF TUBEWELL WITH PURCHASING OF PARTS |
268540 |
REPARING OF TUBEWELL WITH PURCHASING OF PARTS1 |
Completion of work |
-
latitude : 23.36625996977091
Longitude : 87.60084031149745
file name : Image_10032022145859365.png
|
2022-03-10 14:58:59.474013 |
84 |
34825041 |
TUBEWELL NEAR SUNIL TUDU SHOP AT JHARUL |
60000 |
TUBEWELL NEAR SUNIL TUDU SHOP AT JHARUL1 |
Completion of work |
-
latitude : 23.40239075012505
Longitude : 87.60590750724077
file name : Image_23032021130440307.png
|
2021-03-23 13:04:40.405163 |
85 |
34825041 |
TUBEWELL NEAR SUNIL TUDU SHOP AT JHARUL |
60000 |
TUBEWELL NEAR SUNIL TUDU SHOP AT JHARUL1 |
Completion of work |
-
latitude : 23.402352361008525
Longitude : 87.6058198325336
file name : Image_24022021203005462.png
|
2021-02-24 20:30:05.5543 |
86 |
34668089 |
PARAJ SHILLYA ROAD TO SAKAL SEKH HOUSE ROAD |
324792 |
PARAJ SHILLYA ROAD TO SAKAL SEKH HOUSE ROAD1 |
Completion of work |
-
latitude : 23.373010335490108,23.373010335490108
Longitude : 87.60403130203485,87.60403130203485
file name : Image_12032021142956888.png
|
2021-03-12 14:29:56.979982 |
87 |
34668089 |
PARAJ SHILLYA ROAD TO SAKAL SEKH HOUSE ROAD |
324792 |
PARAJ SHILLYA ROAD TO SAKAL SEKH HOUSE ROAD1 |
Completion of work |
-
latitude : 23.373061968013644,23.373061968013644
Longitude : 87.60406650602818,87.60406650602818
file name : Image_24022021124549778.png
|
2021-02-24 12:45:49.89119 |
88 |
34667842 |
PARAJ ANIL HOUSE TO KSHETRANATH BAGDI ROAD |
402190 |
PARAJ ANIL HOUSE TO KSHETRANATH BAGDI ROAD1 |
Completion of work |
-
latitude : 23.367576473392546,23.367576473392546
Longitude : 87.60947794653475,87.60947794653475
file name : Image_04032021124956817.png
|
2021-03-04 12:49:56.943297 |
89 |
34667842 |
PARAJ ANIL HOUSE TO KSHETRANATH BAGDI ROAD |
402190 |
PARAJ ANIL HOUSE TO KSHETRANATH BAGDI ROAD1 |
Completion of work |
-
latitude : 23.367611258290708,23.367611258290708
Longitude : 87.60950518772006,87.60950518772006
file name : Image_24022021124623802.png
|
2021-02-24 12:46:23.928723 |
90 |
34667281 |
BHIMSARA ICDS CENTRE TO DOMPARA ROAD |
303621 |
BHIMSARA ICDS CENTRE TO DOMPARA ROAD1 |
Completion of work |
-
latitude : 23.354631043039262,23.354628193192184
Longitude : 87.5844304729253,87.5844101049006
file name : Image_10032021154241228.png
|
2021-03-10 15:42:41.346658 |
91 |
34667281 |
BHIMSARA ICDS CENTRE TO DOMPARA ROAD |
303621 |
BHIMSARA ICDS CENTRE TO DOMPARA ROAD1 |
Completion of work |
-
latitude : 23.354053236544132,23.354048626497388
Longitude : 87.5841357652098,87.58412453345954
file name : Image_27022021103505954.png
|
2021-02-27 10:35:06.056553 |
92 |
34668723 |
JAGULIPARA SAYED MOLLA HOUSE TO FULU HOUSE ROAD |
201600 |
JAGULIPARA SAYED MOLLA HOUSE TO FULU HOUSE ROAD1 |
Completion of work |
-
latitude : 23.339472077786922,23.339502504095435
Longitude : 87.60027897544205,87.60020043700933
file name : Image_10082021182057606.png
|
2021-08-10 18:20:57.699794 |
93 |
34668723 |
JAGULIPARA SAYED MOLLA HOUSE TO FULU HOUSE ROAD |
201600 |
JAGULIPARA SAYED MOLLA HOUSE TO FULU HOUSE ROAD1 |
Completion of work |
-
latitude : 23.33951197564602,23.33949303254485
Longitude : 87.60028811171651,87.60022558271885
file name : Image_25022021111738560.png
|
2021-02-25 11:17:38.652783 |
94 |
34658463 |
RANADI MASIJDTALA TO UTTARPARA ROAD |
435000 |
RANADI MASIJDTALA TO UTTARPARA ROAD1 |
Completion of work |
-
latitude : 23.359100106172264,23.359100106172264
Longitude : 87.58662510663271,87.58662510663271
file name : Image_21032021113302824.png
|
2021-03-21 11:33:02.992466 |
95 |
34658463 |
RANADI MASIJDTALA TO UTTARPARA ROAD |
435000 |
RANADI MASIJDTALA TO UTTARPARA ROAD1 |
Completion of work |
-
latitude : 23.352564,23.358819060958922
Longitude : 87.5910159,87.58652117103338
file name : Image_27022021103500279.png
|
2021-02-27 10:35:00.375079 |
96 |
49003212 |
CONSTRUCTUION OF PUCCA DRAIN WITH COVER FROM RAMJAN MOLLA HOUSE TO JOLAR MAT AT JAGULIPARA |
635967 |
CONSTRUCTUION OF PUCCA DRAIN WITH COVER FROM RAMJAN MOLLA HOUSE TO JOLAR MAT AT JAGULIPARA1 |
Roof laid |
-
latitude : 23.339891131035984,23.339891131035984
Longitude : 87.6019567809999,87.6019567809999
file name : Image_22032023115657548.png
|
2023-03-22 11:56:57.639183 |
97 |
49003212 |
CONSTRUCTUION OF PUCCA DRAIN WITH COVER FROM RAMJAN MOLLA HOUSE TO JOLAR MAT AT JAGULIPARA |
635967 |
CONSTRUCTUION OF PUCCA DRAIN WITH COVER FROM RAMJAN MOLLA HOUSE TO JOLAR MAT AT JAGULIPARA1 |
Plinth level |
-
latitude : 23.339858064427972,23.33987122401595
Longitude : 87.60198016650975,87.60191495530307
file name : Image_22032023115442962.png
|
2023-03-22 11:54:43.059058 |
98 |
49003212 |
CONSTRUCTUION OF PUCCA DRAIN WITH COVER FROM RAMJAN MOLLA HOUSE TO JOLAR MAT AT JAGULIPARA |
635967 |
CONSTRUCTUION OF PUCCA DRAIN WITH COVER FROM RAMJAN MOLLA HOUSE TO JOLAR MAT AT JAGULIPARA1 |
Plinth level |
-
latitude : 23.33990919403732,23.33990919403732
Longitude : 87.60198100470006,87.60198100470006
file name : Image_22112022081630783.png
|
2022-11-22 08:16:31.187905 |
99 |
49003212 |
CONSTRUCTUION OF PUCCA DRAIN WITH COVER FROM RAMJAN MOLLA HOUSE TO JOLAR MAT AT JAGULIPARA |
635967 |
CONSTRUCTUION OF PUCCA DRAIN WITH COVER FROM RAMJAN MOLLA HOUSE TO JOLAR MAT AT JAGULIPARA1 |
Completion of work |
-
latitude : 23.339874115772545,23.33999121095985
Longitude : 87.60193834081292,87.6020342297852
file name : Image_22112022080855475.png
|
2022-11-22 08:08:55.568837 |
100 |
58557022 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM GANAS MOHANTA HOUSE TO TAROK GHOSH SHOP AT SIMNOR |
350000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM GANAS MOHANTA HOUSE TO TAROK GHOSH SHOP AT SIMNOR1 |
Roof laid |
-
latitude : 23.3784267,23.3784251
Longitude : 87.573498,87.5734848
file name : Image_19072023102854458.png
|
2023-07-19 10:28:54.556266 |
101 |
58557022 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM GANAS MOHANTA HOUSE TO TAROK GHOSH SHOP AT SIMNOR |
350000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM GANAS MOHANTA HOUSE TO TAROK GHOSH SHOP AT SIMNOR1 |
Plinth level |
-
latitude : 23.3784264,23.3784258
Longitude : 87.573498,87.573498
file name : Image_19072023102553495.png
|
2023-07-19 10:25:53.592008 |
102 |
58557022 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM GANAS MOHANTA HOUSE TO TAROK GHOSH SHOP AT SIMNOR |
350000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM GANAS MOHANTA HOUSE TO TAROK GHOSH SHOP AT SIMNOR1 |
Completion of work |
-
latitude : 23.38840047363192,23.38831183500588
Longitude : 87.57860035635531,87.5785469636321
file name : Image_13062023101123174.png
|
2023-06-13 10:11:23.277842 |
103 |
58555403 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BHUDAN MURMU HOUSE TO SONATAN BAIRGYA HOUSE AT NU |
350000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BHUDAN MURMU HOUSE TO SONATAN BAIRGYA HOUSE AT NU1 |
Roof laid |
-
latitude : 23.39522053487599,23.39522053487599
Longitude : 87.58005042560399,87.58005042560399
file name : Image_19072023105549902.png
|
2023-07-19 10:55:49.991536 |
104 |
58555403 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BHUDAN MURMU HOUSE TO SONATAN BAIRGYA HOUSE AT NU |
350000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BHUDAN MURMU HOUSE TO SONATAN BAIRGYA HOUSE AT NU1 |
Plinth level |
-
latitude : 23.39525259565562,23.395267641171813
Longitude : 87.5800097733736,87.57998462766409
file name : Image_19072023105301956.png
|
2023-07-19 10:53:02.051967 |
105 |
58555403 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BHUDAN MURMU HOUSE TO SONATAN BAIRGYA HOUSE AT NU |
350000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BHUDAN MURMU HOUSE TO SONATAN BAIRGYA HOUSE AT NU1 |
Completion of work |
-
latitude : 23.395239477977157,23.39529136195779
Longitude : 87.57999652996659,87.57998378947377
file name : Image_19072023104837903.png
|
2023-07-19 10:48:38.027859 |
106 |
58555403 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BHUDAN MURMU HOUSE TO SONATAN BAIRGYA HOUSE AT NU |
350000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BHUDAN MURMU HOUSE TO SONATAN BAIRGYA HOUSE AT NU1 |
Completion of work |
-
latitude : 23.366554090753198,23.366554090753198
Longitude : 87.60144280269742,87.60144280269742
file name : Image_17052023143955507.png
|
2023-05-17 14:39:55.602155 |
107 |
48999642 |
INSTALLATION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT NURKONA PHASIM BAGDI PARA AT JL NO 4 |
350000 |
INSTALLATION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT NURKONA PHASIM BAGDI PARA AT JL NO 41 |
Roof laid |
-
latitude : 23.397593745030463
Longitude : 87.57995353080332
file name : Image_19072023110952822.png
|
2023-07-19 11:09:52.928374 |
108 |
48999642 |
INSTALLATION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT NURKONA PHASIM BAGDI PARA AT JL NO 4 |
350000 |
INSTALLATION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT NURKONA PHASIM BAGDI PARA AT JL NO 41 |
Plinth level |
-
latitude : 23.397569311782718
Longitude : 87.57994213141501
file name : Image_19072023110432684.png
|
2023-07-19 11:04:32.789099 |
109 |
48999642 |
INSTALLATION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT NURKONA PHASIM BAGDI PARA AT JL NO 4 |
350000 |
INSTALLATION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT NURKONA PHASIM BAGDI PARA AT JL NO 41 |
Completion of work |
-
latitude : 23.39760782662779
Longitude : 87.57994280196726
file name : Image_19072023105840689.png
|
2023-07-19 10:58:40.782791 |
110 |
58554505 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM NARAN BAGDI HOUSE TO JONAKI BAGDI AT KHANPARA |
149600 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM NARAN BAGDI HOUSE TO JONAKI BAGDI AT KHANPARA1 |
Roof laid |
-
latitude : 23.405301282182336,23.405298893339932
Longitude : 87.58048963733017,87.58048888295889
file name : Image_19072023120152779.png
|
2023-07-19 12:01:52.871747 |
111 |
58554505 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM NARAN BAGDI HOUSE TO JONAKI BAGDI AT KHANPARA |
149600 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM NARAN BAGDI HOUSE TO JONAKI BAGDI AT KHANPARA1 |
Plinth level |
-
latitude : 23.405298180878162,23.405298180878162
Longitude : 87.58047128096223,87.58047128096223
file name : Image_19072023115825578.png
|
2023-07-19 11:58:25.689683 |
112 |
58554505 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM NARAN BAGDI HOUSE TO JONAKI BAGDI AT KHANPARA |
149600 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM NARAN BAGDI HOUSE TO JONAKI BAGDI AT KHANPARA1 |
Completion of work |
-
latitude : 23.404956073500216,23.404956073500216
Longitude : 87.58054621517658,87.58054621517658
file name : Image_23022023100447746.png
|
2023-02-23 10:04:47.84005 |
113 |
39055236 |
KONDAIPUR DRAIN FROM DEUPUKUR TO SWASANGHAT |
500000 |
KONDAIPUR DRAIN FROM DEUPUKUR TO SWASANGHAT1 |
Roof laid |
-
latitude : 23.404948320239782,23.404948320239782
Longitude : 87.59529333561659,87.59529333561659
file name : Image_19072023120801113.png
|
2023-07-19 12:08:01.226539 |
114 |
39055236 |
KONDAIPUR DRAIN FROM DEUPUKUR TO SWASANGHAT |
500000 |
KONDAIPUR DRAIN FROM DEUPUKUR TO SWASANGHAT1 |
Plinth level |
-
latitude : 23.405411755666137,23.405411755666137
Longitude : 87.59531102143228,87.59531102143228
file name : Image_23022023094521489.png
|
2023-02-23 09:45:21.586736 |
115 |
39055236 |
KONDAIPUR DRAIN FROM DEUPUKUR TO SWASANGHAT |
500000 |
KONDAIPUR DRAIN FROM DEUPUKUR TO SWASANGHAT1 |
Completion of work |
-
latitude : 23.405455383472145,23.40545856859535
Longitude : 87.59533373638988,87.59533289819956
file name : Image_23022023094313984.png
|
2023-02-23 09:43:14.065226 |
116 |
49000830 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT RAKONA ADHIBASI PARA |
350000 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT RAKONA ADHIBASI PARA1 |
Roof laid |
-
latitude : 23.38838739786297
Longitude : 87.59422489441931
file name : Image_19072023124342335.png
|
2023-07-19 12:43:42.420242 |
117 |
49000830 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT RAKONA ADHIBASI PARA |
350000 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT RAKONA ADHIBASI PARA1 |
Plinth level |
-
latitude : 23.388464846648276
Longitude : 87.5941873434931
file name : Image_19072023124203630.png
|
2023-07-19 12:42:03.730835 |
118 |
49000830 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT RAKONA ADHIBASI PARA |
350000 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT RAKONA ADHIBASI PARA1 |
Completion of work |
-
latitude : 23.38837264571339
Longitude : 87.5942222122103
file name : Image_19072023123929652.png
|
2023-07-19 12:39:29.754376 |
119 |
58569758 |
CONSTRUCTION OF CULVERT NEAR ASPIYA MONDAL HOUSE AT SIMNORI |
124141 |
CONSTRUCTION OF CULVERT NEAR ASPIYA MONDAL HOUSE AT SIMNORI1 |
Completion of work |
-
latitude : 23.365524332039058,23.366368850693107
Longitude : 87.60084064677358,87.60096243582666
file name : Image_11102023162807144.png
|
2023-10-11 16:28:07.24625 |
120 |
58537045 |
CONSTRUCTION OF PUCCA DRAION WITH COVER FROM BAGDIPARA MANASATALA TO SISIR KONAR HOUSE AT JHARUL |
349703 |
CONSTRUCTION OF PUCCA DRAION WITH COVER FROM BAGDIPARA MANASATALA TO SISIR KONAR HOUSE AT JHARUL1 |
Roof laid |
-
latitude : 23.393510626628995,23.393510626628995
Longitude : 87.60092790238559,87.60092790238559
file name : Image_19072023131508082.png
|
2023-07-19 13:15:08.175569 |
121 |
58537045 |
CONSTRUCTION OF PUCCA DRAION WITH COVER FROM BAGDIPARA MANASATALA TO SISIR KONAR HOUSE AT JHARUL |
349703 |
CONSTRUCTION OF PUCCA DRAION WITH COVER FROM BAGDIPARA MANASATALA TO SISIR KONAR HOUSE AT JHARUL1 |
Plinth level |
-
latitude : 23.393553961068392,23.393553961068392
Longitude : 87.60079697705805,87.60079697705805
file name : Image_19072023131252564.png
|
2023-07-19 13:12:52.667096 |
122 |
58537045 |
CONSTRUCTION OF PUCCA DRAION WITH COVER FROM BAGDIPARA MANASATALA TO SISIR KONAR HOUSE AT JHARUL |
349703 |
CONSTRUCTION OF PUCCA DRAION WITH COVER FROM BAGDIPARA MANASATALA TO SISIR KONAR HOUSE AT JHARUL1 |
Completion of work |
-
latitude : 23.393416246399283,23.39353183284402
Longitude : 87.60090711526573,87.60100233368576
file name : Image_19072023130900008.png
|
2023-07-19 13:09:00.111967 |
123 |
58537045 |
CONSTRUCTION OF PUCCA DRAION WITH COVER FROM BAGDIPARA MANASATALA TO SISIR KONAR HOUSE AT JHARUL |
349703 |
CONSTRUCTION OF PUCCA DRAION WITH COVER FROM BAGDIPARA MANASATALA TO SISIR KONAR HOUSE AT JHARUL1 |
Completion of work |
-
latitude : 23.39343166910112,23.393375384621322
Longitude : 87.60102974250913,87.60088423267007
file name : Image_23022023111732279.png
|
2023-02-23 11:17:32.37733 |
124 |
58379394 |
INSTALLATION OF NEW SUBMERCIABLE WITH WATER TANK AND SUPPLY AT L4 DAKSHIN DIK AT PARAJ-X |
500000 |
INSTALLATION OF NEW SUBMERCIABLE WITH WATER TANK AND SUPPLY AT L4 DAKSHIN DIK AT PARAJ-X1 |
Completion of work |
-
latitude : 23.4062518
Longitude : 87.527994
file name : Image_21072023135753523.png
|
2023-07-21 13:57:53.626406 |
125 |
58573559 |
CONSTRUCTION OF CULVERT NEAR BAPI GARAI HOUSE AT BOLPUR |
122276 |
CONSTRUCTION OF CULVERT NEAR BAPI GARAI HOUSE AT BOLPUR1 |
Completion of work |
-
latitude : 23.3802008,23.3801971
Longitude : 87.601973,87.6019794
file name : Image_26072023164055054.png
|
2023-07-26 16:40:55.152171 |
126 |
58581725 |
WATER TESTING CHARGES OF TUBE WELL FOR SANSAD NO-I-XIX TUBE WELL IN GP AREA |
50000 |
WATER TESTING CHARGES OF TUBE WELL FOR SANSAD NO-I-XIX TUBE WELL IN GP AREA1 |
Completion of work |
-
latitude : 23.380199
Longitude : 87.6019803
file name : Image_04082023164734356.png
|
2023-08-04 16:47:35.347929 |
127 |
58383956 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JIO TAWER TO CHAND SEKH HOUSE AT JAGULIPARA |
595477 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JIO TAWER TO CHAND SEKH HOUSE AT JAGULIPARA1 |
Completion of work |
-
latitude : 23.3394744
Longitude : 87.5976759
file name : Image_27092023084146030.png
|
2023-09-27 08:41:46.175657 |
128 |
58560155 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BHIMSARA MAJID TALA TO SASTI PUKUR GAT AT BHIMSAR |
350000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BHIMSARA MAJID TALA TO SASTI PUKUR GAT AT BHIMSAR1 |
Roof laid |
-
latitude : 23.355282610282302,23.355282610282302
Longitude : 87.58382898755372,87.58382898755372
file name : Image_16092023123339140.png
|
2023-09-16 12:33:39.219533 |
129 |
58560155 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BHIMSARA MAJID TALA TO SASTI PUKUR GAT AT BHIMSAR |
350000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BHIMSARA MAJID TALA TO SASTI PUKUR GAT AT BHIMSAR1 |
Plinth level |
-
latitude : 23.355095526203513,23.355095526203513
Longitude : 87.58371440693736,87.58371440693736
file name : Image_16092023122825383.png
|
2023-09-16 12:28:25.586403 |
130 |
58560155 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BHIMSARA MAJID TALA TO SASTI PUKUR GAT AT BHIMSAR |
350000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BHIMSARA MAJID TALA TO SASTI PUKUR GAT AT BHIMSAR1 |
Completion of work |
-
latitude : 23.35515545681119,23.355161366052926
Longitude : 87.58377534337342,87.58377509191632
file name : Image_16092023122301930.png
|
2023-09-16 12:23:02.022339 |
131 |
58540599 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM DULAL MALLICK HOUSE TO GOPI HOUSE AT KORAKDAL |
135000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM DULAL MALLICK HOUSE TO GOPI HOUSE AT KORAKDAL1 |
Roof laid |
-
latitude : 23.35245916619897,23.35245916619897
Longitude : 87.5920896884054,87.5920896884054
file name : Image_16092023124252280.png
|
2023-09-16 12:42:52.383878 |
132 |
58540599 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM DULAL MALLICK HOUSE TO GOPI HOUSE AT KORAKDAL |
135000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM DULAL MALLICK HOUSE TO GOPI HOUSE AT KORAKDAL1 |
Plinth level |
-
latitude : 23.35251926444471,23.35251926444471
Longitude : 87.59201341308653,87.59201341308653
file name : Image_16092023124133770.png
|
2023-09-16 12:41:33.860654 |
133 |
58540599 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM DULAL MALLICK HOUSE TO GOPI HOUSE AT KORAKDAL |
135000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM DULAL MALLICK HOUSE TO GOPI HOUSE AT KORAKDAL1 |
Completion of work |
-
latitude : 23.352442192845047,23.352448688820004
Longitude : 87.59206454269588,87.59205498732626
file name : Image_16092023123945449.png
|
2023-09-16 12:39:45.539647 |
134 |
58382617 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM TARAPADA SINGHA HOUSE TO MATHUR KANJILAL AT PARAJ |
350000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM TARAPADA SINGHA HOUSE TO MATHUR KANJILAL AT PARAJ1 |
Completion of work |
-
latitude : 23.4128643
Longitude : 87.551363
file name : Image_06112023164726087.png
|
2023-11-06 16:47:26.233279 |
135 |
58562898 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM RADHASHAM BISNU HOUSE TO MOHAN GARAI HOUSE AT PAR |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM RADHASHAM BISNU HOUSE TO MOHAN GARAI HOUSE AT PAR1 |
Roof laid |
-
latitude : 23.366178,23.366178
Longitude : 87.6009421,87.6009421
file name : Image_04122023155200907.png
|
2023-12-04 15:52:01.013081 |
136 |
58562898 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM RADHASHAM BISNU HOUSE TO MOHAN GARAI HOUSE AT PAR |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM RADHASHAM BISNU HOUSE TO MOHAN GARAI HOUSE AT PAR1 |
Roof laid |
-
latitude : 23.36820633150637,23.36820545140654
Longitude : 87.60566510260105,87.60576317086816
file name : Image_16092023095539900.png
|
2023-09-16 09:55:39.983196 |
137 |
58562898 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM RADHASHAM BISNU HOUSE TO MOHAN GARAI HOUSE AT PAR |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM RADHASHAM BISNU HOUSE TO MOHAN GARAI HOUSE AT PAR1 |
Plinth level |
-
latitude : 23.368177078664303,23.36819815915078
Longitude : 87.60567641817033,87.60548455640674
file name : Image_16092023095345132.png
|
2023-09-16 09:53:45.211226 |
138 |
58562898 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM RADHASHAM BISNU HOUSE TO MOHAN GARAI HOUSE AT PAR |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM RADHASHAM BISNU HOUSE TO MOHAN GARAI HOUSE AT PAR1 |
Completion of work |
-
latitude : 23.3683974808082,23.36838310584426
Longitude : 87.60565965436399,87.60563869960606
file name : Image_23022023113124973.png
|
2023-02-23 11:31:25.065443 |
139 |
58561549 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM TAPAS BAGDI HOUSE TO DULLAL NAYAK HOUSE AT PARAJ |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM TAPAS BAGDI HOUSE TO DULLAL NAYAK HOUSE AT PARAJ1 |
Roof laid |
-
latitude : 23.366814726032317,23.366833836771548
Longitude : 87.60966553352773,87.60966561734676
file name : Image_16092023101122768.png
|
2023-09-16 10:11:22.865276 |
140 |
58561549 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM TAPAS BAGDI HOUSE TO DULLAL NAYAK HOUSE AT PARAJ |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM TAPAS BAGDI HOUSE TO DULLAL NAYAK HOUSE AT PARAJ1 |
Plinth level |
-
latitude : 23.366738953627646,23.36677310988307
Longitude : 87.60966997593641,87.60965874418616
file name : Image_16092023100849998.png
|
2023-09-16 10:08:50.083147 |
141 |
58561549 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM TAPAS BAGDI HOUSE TO DULLAL NAYAK HOUSE AT PARAJ |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM TAPAS BAGDI HOUSE TO DULLAL NAYAK HOUSE AT PARAJ1 |
Completion of work |
-
latitude : 23.3670326,23.3670326
Longitude : 87.6097366,87.6097366
file name : Image_23022023113330645.png
|
2023-02-23 11:33:30.738209 |
142 |
49000412 |
INSTALLATION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT PARAJ KALI TALA JL NO 48 |
350000 |
INSTALLATION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT PARAJ KALI TALA JL NO 481 |
Roof laid |
-
latitude : 23.369835480116308
Longitude : 87.60988916270435
file name : Image_16092023100510581.png
|
2023-09-16 10:05:10.672653 |
143 |
49000412 |
INSTALLATION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT PARAJ KALI TALA JL NO 48 |
350000 |
INSTALLATION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT PARAJ KALI TALA JL NO 481 |
Plinth level |
-
latitude : 23.369882041588426
Longitude : 87.60986795648932
file name : Image_16092023100224250.png
|
2023-09-16 10:02:24.35578 |
144 |
49000412 |
INSTALLATION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT PARAJ KALI TALA JL NO 48 |
350000 |
INSTALLATION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT PARAJ KALI TALA JL NO 481 |
Completion of work |
-
latitude : 23.3801984
Longitude : 87.601979
file name : Image_03082023152925707.png
|
2023-08-03 15:29:26.446469 |
145 |
58381730 |
INSTALLATION OF NEW SUBMERCIABLE WITH WATER TANK AND SUPPLY AT PARAJ JAHER ALI HOUSE |
500000 |
INSTALLATION OF NEW SUBMERCIABLE WITH WATER TANK AND SUPPLY AT PARAJ JAHER ALI HOUSE1 |
Roof laid |
-
latitude : 23.3663838962093
Longitude : 87.60498289950192
file name : Image_16092023103656385.png
|
2023-09-16 10:36:56.471832 |
146 |
58381730 |
INSTALLATION OF NEW SUBMERCIABLE WITH WATER TANK AND SUPPLY AT PARAJ JAHER ALI HOUSE |
500000 |
INSTALLATION OF NEW SUBMERCIABLE WITH WATER TANK AND SUPPLY AT PARAJ JAHER ALI HOUSE1 |
Plinth level |
-
latitude : 23.36634475272149
Longitude : 87.60503553785384
file name : Image_16092023103009636.png
|
2023-09-16 10:30:09.728524 |
147 |
58381730 |
INSTALLATION OF NEW SUBMERCIABLE WITH WATER TANK AND SUPPLY AT PARAJ JAHER ALI HOUSE |
500000 |
INSTALLATION OF NEW SUBMERCIABLE WITH WATER TANK AND SUPPLY AT PARAJ JAHER ALI HOUSE1 |
Completion of work |
-
latitude : 23.366246935911477
Longitude : 87.60494727641344
file name : Image_16092023102544649.png
|
2023-09-16 10:25:44.743932 |
148 |
49001196 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT PARAJ POLT NO 2498 JL NO 9 |
350000 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT PARAJ POLT NO 2498 JL NO 91 |
Roof laid |
-
latitude : 23.369152899831533
Longitude : 87.60157322511077
file name : Image_16092023105058275.png
|
2023-09-16 10:50:58.357905 |
149 |
49001196 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT PARAJ POLT NO 2498 JL NO 9 |
350000 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT PARAJ POLT NO 2498 JL NO 91 |
Plinth level |
-
latitude : 23.369183368049562
Longitude : 87.60170431807637
file name : Image_16092023104715688.png
|
2023-09-16 10:47:15.771209 |
150 |
49001196 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT PARAJ POLT NO 2498 JL NO 9 |
350000 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT PARAJ POLT NO 2498 JL NO 91 |
Completion of work |
-
latitude : 23.36925239302218
Longitude : 87.60159200057387
file name : Image_16092023104406992.png
|
2023-09-16 10:44:07.082442 |
151 |
49001196 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT PARAJ POLT NO 2498 JL NO 9 |
350000 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT PARAJ POLT NO 2498 JL NO 91 |
Completion of work |
-
latitude : 23.3801946
Longitude : 87.6019776
file name : Image_03082023152719436.png
|
2023-08-03 15:27:19.991376 |
152 |
49057805 |
INSTALLATION OF NEW SUBMASIBEL WITH OVERHEAD TANK AT PARAJ SUB CENTER |
200000 |
INSTALLATION OF NEW SUBMASIBEL WITH OVERHEAD TANK AT PARAJ SUB CENTER1 |
Roof laid |
-
latitude : 23.366259466856718
Longitude : 87.60107818990946
file name : Image_16092023105955555.png
|
2023-09-16 10:59:55.645565 |
153 |
49057805 |
INSTALLATION OF NEW SUBMASIBEL WITH OVERHEAD TANK AT PARAJ SUB CENTER |
200000 |
INSTALLATION OF NEW SUBMASIBEL WITH OVERHEAD TANK AT PARAJ SUB CENTER1 |
Plinth level |
-
latitude : 23.366165421903133
Longitude : 87.60109294205904
file name : Image_16092023105521411.png
|
2023-09-16 10:55:21.502513 |
154 |
49057805 |
INSTALLATION OF NEW SUBMASIBEL WITH OVERHEAD TANK AT PARAJ SUB CENTER |
200000 |
INSTALLATION OF NEW SUBMASIBEL WITH OVERHEAD TANK AT PARAJ SUB CENTER1 |
Plinth level |
-
latitude : 23.36631114128977
Longitude : 87.60108330287039
file name : Image_08122022124005765.png
|
2022-12-08 12:40:05.859054 |
155 |
49057805 |
INSTALLATION OF NEW SUBMASIBEL WITH OVERHEAD TANK AT PARAJ SUB CENTER |
200000 |
INSTALLATION OF NEW SUBMASIBEL WITH OVERHEAD TANK AT PARAJ SUB CENTER1 |
Completion of work |
-
latitude : 23.366234195418656
Longitude : 87.60096897371113
file name : Image_08122022123728096.png
|
2022-12-08 12:37:28.199025 |
156 |
58559468 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM SHILLA ROAD TO FOTIK SEKH HOUSE AT PARAJ |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM SHILLA ROAD TO FOTIK SEKH HOUSE AT PARAJ1 |
Roof laid |
-
latitude : 23.365632039494812,23.365632039494812
Longitude : 87.60065230540931,87.60065230540931
file name : Image_16092023112751432.png
|
2023-09-16 11:27:51.533796 |
157 |
58559468 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM SHILLA ROAD TO FOTIK SEKH HOUSE AT PARAJ |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM SHILLA ROAD TO FOTIK SEKH HOUSE AT PARAJ1 |
Plinth level |
-
latitude : 23.36536122020334,23.365650437772274
Longitude : 87.60051836259663,87.60057359933853
file name : Image_16092023112508343.png
|
2023-09-16 11:25:08.439181 |
158 |
58559468 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM SHILLA ROAD TO FOTIK SEKH HOUSE AT PARAJ |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM SHILLA ROAD TO FOTIK SEKH HOUSE AT PARAJ1 |
Completion of work |
-
latitude : 23.366241613402963,23.366248486563563
Longitude : 87.60482892394066,87.60482054203749
file name : Image_19032023103519163.png
|
2023-03-19 10:35:19.25439 |
159 |
58377199 |
INSTALLATION OF NEW SUBMERCIABLE WITH WATER TANK AND SUPPLY AT SIHIGRAM DURGATALA |
500000 |
INSTALLATION OF NEW SUBMERCIABLE WITH WATER TANK AND SUPPLY AT SIHIGRAM DURGATALA1 |
Roof laid |
-
latitude : 23.363209879025817
Longitude : 87.57722186855972
file name : Image_16092023120027697.png
|
2023-09-16 12:00:27.793666 |
160 |
58377199 |
INSTALLATION OF NEW SUBMERCIABLE WITH WATER TANK AND SUPPLY AT SIHIGRAM DURGATALA |
500000 |
INSTALLATION OF NEW SUBMERCIABLE WITH WATER TANK AND SUPPLY AT SIHIGRAM DURGATALA1 |
Plinth level |
-
latitude : 23.363201203756034
Longitude : 87.57726402953267
file name : Image_16092023115811449.png
|
2023-09-16 11:58:11.534984 |
161 |
58377199 |
INSTALLATION OF NEW SUBMERCIABLE WITH WATER TANK AND SUPPLY AT SIHIGRAM DURGATALA |
500000 |
INSTALLATION OF NEW SUBMERCIABLE WITH WATER TANK AND SUPPLY AT SIHIGRAM DURGATALA1 |
Completion of work |
-
latitude : 23.363239131867886
Longitude : 87.57724198512733
file name : Image_16092023115427153.png
|
2023-09-16 11:54:27.247384 |
162 |
58538464 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM BANKA TO MANAISHA HOUSE AT RANADI |
349703 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM BANKA TO MANAISHA HOUSE AT RANADI1 |
Roof laid |
-
latitude : 23.35978054907173,23.359783524647355
Longitude : 87.58616301231086,87.58615504950285
file name : Image_16092023121041096.png
|
2023-09-16 12:10:41.188426 |
163 |
58538464 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM BANKA TO MANAISHA HOUSE AT RANADI |
349703 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM BANKA TO MANAISHA HOUSE AT RANADI1 |
Plinth level |
-
latitude : 23.359883353114128,23.359931926243007
Longitude : 87.5861419737339,87.58608925156295
file name : Image_16092023120727825.png
|
2023-09-16 12:07:27.933855 |
164 |
58538464 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM BANKA TO MANAISHA HOUSE AT RANADI |
349703 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM BANKA TO MANAISHA HOUSE AT RANADI1 |
Completion of work |
-
latitude : 23.360002543777227,23.360002543777227
Longitude : 87.58574852719903,87.58574852719903
file name : Image_07032023100721578.png
|
2023-03-07 10:07:21.668318 |
165 |
68785233 |
Construction of roads |
209800 |
Construction of roads1 |
Plinth level |
-
latitude : 23.363774232566357,23.363774232566357
Longitude : 87.57743963040411,87.57743963040411
file name : Image_10112023160437919.png
|
2023-11-10 16:04:38.026041 |
166 |
68785233 |
Construction of roads |
209800 |
Construction of roads1 |
Completion of work |
-
latitude : 23.36364883929491,23.363571683876216
Longitude : 87.5777376908809,87.57781371474266
file name : Image_10112023160136638.png
|
2023-11-10 16:01:36.725037 |
167 |
68787061 |
Construction of roads |
303585 |
Construction of roads1 |
Roof laid |
-
latitude : 23.35645687300712,23.35645687300712
Longitude : 87.59547974914312,87.59547974914312
file name : Image_25112023110357071.png
|
2023-11-25 11:03:57.166571 |
168 |
68787061 |
Construction of roads |
303585 |
Construction of roads1 |
Plinth level |
-
latitude : 23.359615886583924,23.35961571894586
Longitude : 87.58684479631484,87.58684664033353
file name : Image_10112023161325186.png
|
2023-11-10 16:13:25.276203 |
169 |
68787061 |
Construction of roads |
303585 |
Construction of roads1 |
Completion of work |
-
latitude : 23.35985845886171,23.35985933896154
Longitude : 87.58623383939266,87.58625445887446
file name : Image_10112023161139113.png
|
2023-11-10 16:11:39.199961 |
170 |
68809657 |
Creation of drainage channel for management of grey water |
169755 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.36433359887451
Longitude : 87.60415971279144
file name : Image_01122023130339732.png
|
2023-12-01 13:03:39.83083 |
171 |
68809657 |
Creation of drainage channel for management of grey water |
169755 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.3642053976655
Longitude : 87.60443338193
file name : Image_01122023125930560.png
|
2023-12-01 12:59:30.66427 |
172 |
68809657 |
Creation of drainage channel for management of grey water |
169755 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.36431000381708
Longitude : 87.60419508442283
file name : Image_10112023163106556.png
|
2023-11-10 16:31:06.650413 |
173 |
68786685 |
Construction of roads |
303585 |
Construction of roads1 |
Roof laid |
-
latitude : 23.36914523039013,23.36914300918579
Longitude : 87.6019961759448,87.60199382901192
file name : Image_25112023114937761.png
|
2023-11-25 11:49:37.84545 |
174 |
68786685 |
Construction of roads |
303585 |
Construction of roads1 |
Plinth level |
-
latitude : 23.359326836653054,23.359326836653054
Longitude : 87.59330087341368,87.59330087341368
file name : Image_25112023114827095.png
|
2023-11-25 11:48:27.18675 |
175 |
68786685 |
Construction of roads |
303585 |
Construction of roads1 |
Completion of work |
-
latitude : 23.368971180170774,23.368971180170774
Longitude : 87.60215945541859,87.60215945541859
file name : Image_10112023164201956.png
|
2023-11-10 16:42:02.085403 |
176 |
68805815 |
Creation of a new source of drinking water |
378225 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.35939284414053
Longitude : 87.5932927429676
file name : Image_29112023114230509.png
|
2023-11-29 11:42:30.595419 |
177 |
68805815 |
Creation of a new source of drinking water |
378225 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.359315479174256
Longitude : 87.59345065802336
file name : Image_25112023112924783.png
|
2023-11-25 11:29:24.867301 |
178 |
68805815 |
Creation of a new source of drinking water |
378225 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.3593935566023
Longitude : 87.59328654035926
file name : Image_10112023163030761.png
|
2023-11-10 16:30:30.850459 |
179 |
58534722 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM TAHIR ALI HOUSE TO SALAM LAND AT SIMNORI |
349703 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM TAHIR ALI HOUSE TO SALAM LAND AT SIMNORI1 |
Completion of work |
-
latitude : 23.381092878989875,23.381092878989875
Longitude : 87.57498230785131,87.57498230785131
file name : Image_06032023080247226.png
|
2023-03-06 08:02:47.315072 |
180 |
68782305 |
Construction of roads |
215756 |
Construction of roads1 |
Roof laid |
-
latitude : 23.359492463059723,23.359492463059723
Longitude : 87.58636124432087,87.58636124432087
file name : Image_25112023112136193.png
|
2023-11-25 11:21:36.275766 |
181 |
68782305 |
Construction of roads |
215756 |
Construction of roads1 |
Plinth level |
-
latitude : 23.35954451467842,23.35954573005438
Longitude : 87.58664027787745,87.58663759566844
file name : Image_25112023110549600.png
|
2023-11-25 11:05:49.68695 |
182 |
68782305 |
Construction of roads |
215756 |
Construction of roads1 |
Completion of work |
-
latitude : 23.36912197060883,23.36912197060883
Longitude : 87.60256933048368,87.60256933048368
file name : Image_10112023164313922.png
|
2023-11-10 16:43:14.04005 |
183 |
48999918 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT SIMNORI MAJ PARA MASJID TALA JL NO 5 |
350000 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT SIMNORI MAJ PARA MASJID TALA JL NO 51 |
Roof laid |
-
latitude : 23.37697593960911
Longitude : 87.57443195208907
file name : Image_10012024162340129.png
|
2024-01-10 16:23:40.223195 |
184 |
48999918 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT SIMNORI MAJ PARA MASJID TALA JL NO 5 |
350000 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT SIMNORI MAJ PARA MASJID TALA JL NO 51 |
Plinth level |
-
latitude : 23.376849330961704
Longitude : 87.57430697791278
file name : Image_10012024162117214.png
|
2024-01-10 16:21:17.297692 |
185 |
48999918 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT SIMNORI MAJ PARA MASJID TALA JL NO 5 |
350000 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT SIMNORI MAJ PARA MASJID TALA JL NO 51 |
Completion of work |
-
latitude : 23.375322190113366
Longitude : 87.5737670995295
file name : Image_19072023103733916.png
|
2023-07-19 10:37:34.020216 |
186 |
68788912 |
Construction of roads |
326292 |
Construction of roads1 |
Roof laid |
-
latitude : 23.36879943497479,23.36879943497479
Longitude : 87.60981598868966,87.60981598868966
file name : Image_25112023115557818.png
|
2023-11-25 11:55:57.915733 |
187 |
68788912 |
Construction of roads |
326292 |
Construction of roads1 |
Plinth level |
-
latitude : 23.369083162397146,23.369083162397146
Longitude : 87.60210094973445,87.60210094973445
file name : Image_25112023115346263.png
|
2023-11-25 11:53:46.358537 |
188 |
68788912 |
Construction of roads |
326292 |
Construction of roads1 |
Completion of work |
-
latitude : 23.36453229188919,23.368407119996846
Longitude : 87.60422316379845,87.60971305891871
file name : Image_10112023163617537.png
|
2023-11-10 16:36:17.649765 |
189 |
68810986 |
Creation of drainage channel for management of grey water |
650000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.338350914418697
Longitude : 87.59793262928724
file name : Image_01032024112120962.png
|
2024-03-01 11:21:21.046233 |
190 |
68810986 |
Creation of drainage channel for management of grey water |
650000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.338345885276794
Longitude : 87.59790731593966
file name : Image_01032024111818591.png
|
2024-03-01 11:18:18.683919 |
191 |
68810986 |
Creation of drainage channel for management of grey water |
650000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.338371491990983
Longitude : 87.59794855490327
file name : Image_01032024111551856.png
|
2024-03-01 11:15:51.946405 |
192 |
68805080 |
Creation of a new source of drinking water |
400000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.389250650070608
Longitude : 87.60145948268473
file name : Image_11022024163448843.png
|
2024-02-11 16:34:48.934118 |
193 |
68805080 |
Creation of a new source of drinking water |
400000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.38927692733705
Longitude : 87.6014213450253
file name : Image_11022024163213319.png
|
2024-02-11 16:32:13.398383 |
194 |
68805080 |
Creation of a new source of drinking water |
400000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.38930898811668
Longitude : 87.60150725953281
file name : Image_11022024163010423.png
|
2024-02-11 16:30:10.52626 |
195 |
68809062 |
Creation of drainage channel for management of grey water |
400000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.376830597408116
Longitude : 87.57458274252713
file name : Image_11022024160906159.png
|
2024-02-11 16:09:06.236518 |
196 |
68809062 |
Creation of drainage channel for management of grey water |
400000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.3772578
Longitude : 87.5748472
file name : Image_11022024160700907.png
|
2024-02-11 16:07:00.999604 |
197 |
68809062 |
Creation of drainage channel for management of grey water |
400000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.3772565
Longitude : 87.5748484
file name : Image_11022024160330160.png
|
2024-02-11 16:03:30.249845 |
198 |
68789997 |
Construction of roads |
259404 |
Construction of roads1 |
Roof laid |
-
latitude : 23.339693333333337,23.3400042
Longitude : 87.59649833333333,87.5965725
file name : Image_15042024092132943.png
|
2024-04-15 09:21:33.025244 |
199 |
68789997 |
Construction of roads |
259404 |
Construction of roads1 |
Plinth level |
-
latitude : 23.339713333333332,23.339713333333332
Longitude : 87.59654,87.59654
file name : Image_15042024091908364.png
|
2024-04-15 09:19:08.460151 |
200 |
68789997 |
Construction of roads |
259404 |
Construction of roads1 |
Completion of work |
-
latitude : 23.3400042,23.34349166666667
Longitude : 87.5965725,87.59376666666667
file name : Image_15042024091429436.png
|
2024-04-15 09:14:29.525479 |
201 |
68789165 |
Construction of roads |
349007 |
Construction of roads1 |
Roof laid |
-
latitude : 23.366357157938182,23.366357157938182
Longitude : 87.60606743395329,87.60606743395329
file name : Image_03042024140248858.png
|
2024-04-03 14:02:48.954893 |
202 |
68789165 |
Construction of roads |
349007 |
Construction of roads1 |
Plinth level |
-
latitude : 23.366334903985262,23.36633695755154
Longitude : 87.60606877505779,87.60603482834995
file name : Image_03042024140023024.png
|
2024-04-03 14:00:23.173433 |
203 |
68789165 |
Construction of roads |
349007 |
Construction of roads1 |
Completion of work |
-
latitude : 23.36633318569511,23.366389805451035
Longitude : 87.60602225549519,87.60603633709252
file name : Image_03042024135551743.png
|
2024-04-03 13:55:51.823087 |
204 |
68788669 |
Construction of roads |
495245 |
Construction of roads1 |
Roof laid |
-
latitude : 23.353371494449675,23.353375140577555
Longitude : 87.59376724250615,87.59374687448144
file name : Image_29112023113749452.png
|
2023-11-29 11:37:49.550577 |
205 |
68788669 |
Construction of roads |
495245 |
Construction of roads1 |
Plinth level |
-
latitude : 23.353385953232646,23.35338084027171
Longitude : 87.59371946565807,87.59371787309647
file name : Image_29112023113615399.png
|
2023-11-29 11:36:15.496038 |
206 |
68788669 |
Construction of roads |
495245 |
Construction of roads1 |
Completion of work |
-
latitude : 23.353168233297765,23.353168233297765
Longitude : 87.59397083893418,87.59397083893418
file name : Image_29112023113114292.png
|
2023-11-29 11:31:14.383796 |
207 |
68808368 |
Creation of drainage channel for management of grey water |
437064 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.4048878448084
Longitude : 87.58047077804804
file name : Image_05022024092909708.png
|
2024-02-05 09:29:09.789587 |
208 |
68808368 |
Creation of drainage channel for management of grey water |
437064 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.404929502867162
Longitude : 87.58048846386373
file name : Image_10012024165043896.png
|
2024-01-10 16:50:43.986338 |
209 |
68808368 |
Creation of drainage channel for management of grey water |
437064 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.404910434037447
Longitude : 87.58040447719395
file name : Image_10012024164605759.png
|
2024-01-10 16:46:05.857821 |
210 |
68804739 |
Creation of a new source of drinking water |
441387 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.364240475930274
Longitude : 87.60263697244227
file name : Image_04122023162651276.png
|
2023-12-04 16:26:51.359996 |
211 |
68804739 |
Creation of a new source of drinking water |
441387 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.36416948121041
Longitude : 87.60258299298584
file name : Image_04122023162455269.png
|
2023-12-04 16:24:55.354956 |
212 |
68804739 |
Creation of a new source of drinking water |
441387 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.364311805926263
Longitude : 87.60270662605762
file name : Image_01122023130647646.png
|
2023-12-01 13:06:47.731925 |
213 |
68803020 |
Creation of a new source of drinking water |
450000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.381090741604567
Longitude : 87.5737485755235
file name : Image_11022024161611695.png
|
2024-02-11 16:16:11.772727 |
214 |
68803020 |
Creation of a new source of drinking water |
450000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.381120706908405
Longitude : 87.5736381020397
file name : Image_10012024163318287.png
|
2024-01-10 16:33:18.38658 |
215 |
68803020 |
Creation of a new source of drinking water |
450000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.381041497923434
Longitude : 87.57361421361566
file name : Image_10012024163123120.png
|
2024-01-10 16:31:23.210463 |
216 |
68803020 |
Creation of a new source of drinking water |
450000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.381076366640627
Longitude : 87.57355704903603
file name : Image_10012024162859882.png
|
2024-01-10 16:28:59.969029 |
217 |
49006016 |
CONSTRUCTUION OF CONCRETE ROAD FROM SHIBU PRASAD HOUSE TO BHUTURE PUL AT PARAJ |
340308 |
CONSTRUCTUION OF CONCRETE ROAD FROM SHIBU PRASAD HOUSE TO BHUTURE PUL AT PARAJ1 |
Roof laid |
-
latitude : 23.3661721,23.3661721
Longitude : 87.606526,87.606526
file name : Image_22102022141151173.png
|
2022-10-22 14:11:51.293177 |
218 |
49006016 |
CONSTRUCTUION OF CONCRETE ROAD FROM SHIBU PRASAD HOUSE TO BHUTURE PUL AT PARAJ |
340308 |
CONSTRUCTUION OF CONCRETE ROAD FROM SHIBU PRASAD HOUSE TO BHUTURE PUL AT PARAJ1 |
Plinth level |
-
latitude : 23.3661133,23.366114
Longitude : 87.6065147,87.6065218
file name : Image_13092022120152312.png
|
2022-09-13 12:01:52.401498 |
219 |
49006016 |
CONSTRUCTUION OF CONCRETE ROAD FROM SHIBU PRASAD HOUSE TO BHUTURE PUL AT PARAJ |
340308 |
CONSTRUCTUION OF CONCRETE ROAD FROM SHIBU PRASAD HOUSE TO BHUTURE PUL AT PARAJ1 |
Completion of work |
-
latitude : 23.3661136,23.3661141
Longitude : 87.6065174,87.6065154
file name : Image_13092022115503074.png
|
2022-09-13 11:55:03.178863 |
220 |
49005867 |
CONSTRUCTUION OF CONCRETE ROAD FROM BAKA BHADH FOOT BALL MAT AT KONDAIPUR |
302580 |
CONSTRUCTUION OF CONCRETE ROAD FROM BAKA BHADH FOOT BALL MAT AT KONDAIPUR1 |
Roof laid |
-
latitude : 23.40414613019675,23.404149692505598
Longitude : 87.59320640936494,87.59320934303105
file name : Image_19072023121733003.png
|
2023-07-19 12:17:33.110865 |
221 |
49005867 |
CONSTRUCTUION OF CONCRETE ROAD FROM BAKA BHADH FOOT BALL MAT AT KONDAIPUR |
302580 |
CONSTRUCTUION OF CONCRETE ROAD FROM BAKA BHADH FOOT BALL MAT AT KONDAIPUR1 |
Roof laid |
-
latitude : 23.40433271136135,23.40433271136135
Longitude : 87.5932893063873,87.5932893063873
file name : Image_10092022130741143.png
|
2022-09-10 13:07:41.230164 |
222 |
49005867 |
CONSTRUCTUION OF CONCRETE ROAD FROM BAKA BHADH FOOT BALL MAT AT KONDAIPUR |
302580 |
CONSTRUCTUION OF CONCRETE ROAD FROM BAKA BHADH FOOT BALL MAT AT KONDAIPUR1 |
Plinth level |
-
latitude : 23.404004559852183,23.40421817265451
Longitude : 87.5930768251419,87.59332995861769
file name : Image_10092022130510115.png
|
2022-09-10 13:05:10.20232 |
223 |
49005867 |
CONSTRUCTUION OF CONCRETE ROAD FROM BAKA BHADH FOOT BALL MAT AT KONDAIPUR |
302580 |
CONSTRUCTUION OF CONCRETE ROAD FROM BAKA BHADH FOOT BALL MAT AT KONDAIPUR1 |
Completion of work |
-
latitude : 23.403616729192436,23.403682694770396
Longitude : 87.59307221509516,87.59320599026978
file name : Image_10092022125859287.png
|
2022-09-10 12:58:59.406041 |
224 |
49003355 |
CONSTRUCTUION OF PUCCA DRAIN WITH COVER FROM NAYAN MOLLA HOUSE TO SULTAN HOUSE AT JAGULIPARA |
614372 |
CONSTRUCTUION OF PUCCA DRAIN WITH COVER FROM NAYAN MOLLA HOUSE TO SULTAN HOUSE AT JAGULIPARA1 |
Roof laid |
-
latitude : 23.340163710527122,23.340173265896738
Longitude : 87.5983648840338,87.598309898749
file name : Image_22082022110626896.png
|
2022-08-22 11:06:26.991654 |
225 |
49003355 |
CONSTRUCTUION OF PUCCA DRAIN WITH COVER FROM NAYAN MOLLA HOUSE TO SULTAN HOUSE AT JAGULIPARA |
614372 |
CONSTRUCTUION OF PUCCA DRAIN WITH COVER FROM NAYAN MOLLA HOUSE TO SULTAN HOUSE AT JAGULIPARA1 |
Plinth level |
-
latitude : 23.34022514987737,23.340085549280047
Longitude : 87.59833764284849,87.59826304391026
file name : Image_22082022110206104.png
|
2022-08-22 11:02:06.273496 |
226 |
49003355 |
CONSTRUCTUION OF PUCCA DRAIN WITH COVER FROM NAYAN MOLLA HOUSE TO SULTAN HOUSE AT JAGULIPARA |
614372 |
CONSTRUCTUION OF PUCCA DRAIN WITH COVER FROM NAYAN MOLLA HOUSE TO SULTAN HOUSE AT JAGULIPARA1 |
Completion of work |
-
latitude : 23.34013621788472,23.34017930086702
Longitude : 87.59842615574598,87.59850000031292
file name : Image_22082022105855572.png
|
2022-08-22 10:58:55.694666 |
227 |
49005717 |
CONSTRUCTUION OF CONCRETE ROAD FROM SEKH NIJAMUL HOUSE TO SEKH ABDUL GAFFAR HOUSE AT BHIMSARA |
434959 |
CONSTRUCTUION OF CONCRETE ROAD FROM SEKH NIJAMUL HOUSE TO SEKH ABDUL GAFFAR HOUSE AT BHIMSARA1 |
Roof laid |
-
latitude : 23.355439309962094,23.355439309962094
Longitude : 87.58350410498679,87.58350410498679
file name : Image_16092023122108578.png
|
2023-09-16 12:21:08.669762 |
228 |
49005717 |
CONSTRUCTUION OF CONCRETE ROAD FROM SEKH NIJAMUL HOUSE TO SEKH ABDUL GAFFAR HOUSE AT BHIMSARA |
434959 |
CONSTRUCTUION OF CONCRETE ROAD FROM SEKH NIJAMUL HOUSE TO SEKH ABDUL GAFFAR HOUSE AT BHIMSARA1 |
Plinth level |
-
latitude : 23.355426527559757,23.355426527559757
Longitude : 87.58354081772268,87.58354081772268
file name : Image_16092023121807849.png
|
2023-09-16 12:18:07.949353 |
229 |
49005717 |
CONSTRUCTUION OF CONCRETE ROAD FROM SEKH NIJAMUL HOUSE TO SEKH ABDUL GAFFAR HOUSE AT BHIMSARA |
434959 |
CONSTRUCTUION OF CONCRETE ROAD FROM SEKH NIJAMUL HOUSE TO SEKH ABDUL GAFFAR HOUSE AT BHIMSARA1 |
Completion of work |
-
latitude : 23.355644959956408,23.355654096230865
Longitude : 87.58334602229297,87.58336337283254
file name : Image_22112022090514268.png
|
2022-11-22 09:05:14.34447 |
230 |
49003677 |
UPGRADATION CONCRETE ROAD FROM JAMEENR ARAT TO CULVERT AT SIMNORI |
743115 |
UPGRADATION CONCRETE ROAD FROM JAMEENR ARAT TO CULVERT AT SIMNORI1 |
Roof laid |
-
latitude : 23.382046278566122,23.382046278566122
Longitude : 87.57424495182931,87.57424495182931
file name : Image_03112022164404633.png
|
2022-11-03 16:44:04.745278 |
231 |
49003677 |
UPGRADATION CONCRETE ROAD FROM JAMEENR ARAT TO CULVERT AT SIMNORI |
743115 |
UPGRADATION CONCRETE ROAD FROM JAMEENR ARAT TO CULVERT AT SIMNORI1 |
Plinth level |
-
latitude : 23.382053109817207,23.382053109817207
Longitude : 87.5742076523602,87.5742076523602
file name : Image_03112022164222478.png
|
2022-11-03 16:42:22.574 |
232 |
49003677 |
UPGRADATION CONCRETE ROAD FROM JAMEENR ARAT TO CULVERT AT SIMNORI |
743115 |
UPGRADATION CONCRETE ROAD FROM JAMEENR ARAT TO CULVERT AT SIMNORI1 |
Completion of work |
-
latitude : 23.382018241100013,23.382018241100013
Longitude : 87.57426850497723,87.57426850497723
file name : Image_03112022164014273.png
|
2022-11-03 16:40:14.368886 |
233 |
49006128 |
CONSTRUCTUION OF CONCRETE ROAD FROM MOLOY GORAI HOUSE TO PRATHAMIK SCHOOL AT PARAJ |
437697 |
CONSTRUCTUION OF CONCRETE ROAD FROM MOLOY GORAI HOUSE TO PRATHAMIK SCHOOL AT PARAJ1 |
Roof laid |
-
latitude : 23.36821110919118,23.36821110919118
Longitude : 87.60562243871391,87.60562243871391
file name : Image_16092023095752439.png
|
2023-09-16 09:57:52.527597 |
234 |
49006128 |
CONSTRUCTUION OF CONCRETE ROAD FROM MOLOY GORAI HOUSE TO PRATHAMIK SCHOOL AT PARAJ |
437697 |
CONSTRUCTUION OF CONCRETE ROAD FROM MOLOY GORAI HOUSE TO PRATHAMIK SCHOOL AT PARAJ1 |
Roof laid |
-
latitude : 23.36832036729902,23.36832036729902
Longitude : 87.60601244866848,87.60601244866848
file name : Image_22102022140841979.png
|
2022-10-22 14:08:42.160082 |
235 |
49006128 |
CONSTRUCTUION OF CONCRETE ROAD FROM MOLOY GORAI HOUSE TO PRATHAMIK SCHOOL AT PARAJ |
437697 |
CONSTRUCTUION OF CONCRETE ROAD FROM MOLOY GORAI HOUSE TO PRATHAMIK SCHOOL AT PARAJ1 |
Plinth level |
-
latitude : 23.368346937932074,23.3683507097885
Longitude : 87.60560785420239,87.60561506263912
file name : Image_22102022140629950.png
|
2022-10-22 14:06:30.108789 |
236 |
49006128 |
CONSTRUCTUION OF CONCRETE ROAD FROM MOLOY GORAI HOUSE TO PRATHAMIK SCHOOL AT PARAJ |
437697 |
CONSTRUCTUION OF CONCRETE ROAD FROM MOLOY GORAI HOUSE TO PRATHAMIK SCHOOL AT PARAJ1 |
Completion of work |
-
latitude : 23.368362402543426,23.36828809697181
Longitude : 87.6056070998311,87.60557751171291
file name : Image_22102022140437134.png
|
2022-10-22 14:04:37.297704 |
237 |
49002548 |
CONSTRUCTUION OF PUCCA DRAIN FROM D.V.C TO NATUN PUKUR PAR AT SIHIGRAM |
400282 |
CONSTRUCTUION OF PUCCA DRAIN FROM D.V.C TO NATUN PUKUR PAR AT SIHIGRAM1 |
Roof laid |
-
latitude : 23.36414337158203,23.36417140904814
Longitude : 87.60265097022057,87.60262607596815
file name : Image_04122023162344597.png
|
2023-12-04 16:23:44.694545 |
238 |
49002548 |
CONSTRUCTUION OF PUCCA DRAIN FROM D.V.C TO NATUN PUKUR PAR AT SIHIGRAM |
400282 |
CONSTRUCTUION OF PUCCA DRAIN FROM D.V.C TO NATUN PUKUR PAR AT SIHIGRAM1 |
Plinth level |
-
latitude : 23.366222041659057,23.363425587303936
Longitude : 87.60114415548742,87.60246723890305
file name : Image_04122023162052409.png
|
2023-12-04 16:20:52.496895 |
239 |
49002548 |
CONSTRUCTUION OF PUCCA DRAIN FROM D.V.C TO NATUN PUKUR PAR AT SIHIGRAM |
400282 |
CONSTRUCTUION OF PUCCA DRAIN FROM D.V.C TO NATUN PUKUR PAR AT SIHIGRAM1 |
Completion of work |
-
latitude : 23.365638284012675,23.36559138726443
Longitude : 87.57401855662465,87.57398108951747
file name : Image_15012023114912599.png
|
2023-01-15 11:49:12.696798 |
240 |
58564802 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BASU BAGDI HOUSE TO AJIT BAGDI HOUSE AT RAKONA |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BASU BAGDI HOUSE TO AJIT BAGDI HOUSE AT RAKONA1 |
Plinth level |
-
latitude : 23.3886647131294,23.388662450015545
Longitude : 87.59406588971615,87.59408785030246
file name : Image_19072023123538457.png
|
2023-07-19 12:35:38.553773 |
241 |
58564802 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BASU BAGDI HOUSE TO AJIT BAGDI HOUSE AT RAKONA |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BASU BAGDI HOUSE TO AJIT BAGDI HOUSE AT RAKONA1 |
Plinth level |
-
latitude : 23.388677202165127,23.388677202165127
Longitude : 87.59408961050212,87.59408961050212
file name : Image_23022023103556712.png
|
2023-02-23 10:35:56.80668 |
242 |
58564802 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BASU BAGDI HOUSE TO AJIT BAGDI HOUSE AT RAKONA |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM BASU BAGDI HOUSE TO AJIT BAGDI HOUSE AT RAKONA1 |
Completion of work |
-
latitude : 23.388724476099014,23.388724476099014
Longitude : 87.59412808343768,87.59412808343768
file name : Image_23022023103114077.png
|
2023-02-23 10:31:14.16902 |
243 |
58558717 |
UPGRADATION OF MOORUM ROAD INTIO CONCRETE ROAD FROM BOTTALA TO SUBHUI MAJHI HOUSE AT KONDAIPUR |
200000 |
UPGRADATION OF MOORUM ROAD INTIO CONCRETE ROAD FROM BOTTALA TO SUBHUI MAJHI HOUSE AT KONDAIPUR1 |
Roof laid |
-
latitude : 23.406289843842387,23.406289843842387
Longitude : 87.5942512974143,87.5942512974143
file name : Image_19072023121140409.png
|
2023-07-19 12:11:40.531609 |
244 |
58558717 |
UPGRADATION OF MOORUM ROAD INTIO CONCRETE ROAD FROM BOTTALA TO SUBHUI MAJHI HOUSE AT KONDAIPUR |
200000 |
UPGRADATION OF MOORUM ROAD INTIO CONCRETE ROAD FROM BOTTALA TO SUBHUI MAJHI HOUSE AT KONDAIPUR1 |
Plinth level |
-
latitude : 23.405453874729574,23.405453874729574
Longitude : 87.59495780803263,87.59495780803263
file name : Image_23022023093534703.png
|
2023-02-23 09:35:34.793162 |
245 |
58558717 |
UPGRADATION OF MOORUM ROAD INTIO CONCRETE ROAD FROM BOTTALA TO SUBHUI MAJHI HOUSE AT KONDAIPUR |
200000 |
UPGRADATION OF MOORUM ROAD INTIO CONCRETE ROAD FROM BOTTALA TO SUBHUI MAJHI HOUSE AT KONDAIPUR1 |
Completion of work |
-
latitude : 23.40590829961002,23.405930972658098
Longitude : 87.59479695931077,87.59481372311711
file name : Image_23022023093232433.png
|
2023-02-23 09:32:32.523258 |
246 |
49000700 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT KHURAJ CHATAR JLNO 82 POLT NO 1213 |
456819 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT KHURAJ CHATAR JLNO 82 POLT NO 12131 |
Roof laid |
-
latitude : 23.3661803
Longitude : 87.6009468
file name : Image_04122023163608972.png
|
2023-12-04 16:36:09.058936 |
247 |
49000700 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT KHURAJ CHATAR JLNO 82 POLT NO 1213 |
456819 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT KHURAJ CHATAR JLNO 82 POLT NO 12131 |
Plinth level |
-
latitude : 23.364150705747306
Longitude : 87.60267209261656
file name : Image_04122023163442008.png
|
2023-12-04 16:34:42.16906 |
248 |
49000700 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT KHURAJ CHATAR JLNO 82 POLT NO 1213 |
456819 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT KHURAJ CHATAR JLNO 82 POLT NO 12131 |
Completion of work |
-
latitude : 23.350494615733624
Longitude : 87.61586152017117
file name : Image_04032023172846381.png
|
2023-03-04 17:28:46.475776 |
249 |
49000700 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT KHURAJ CHATAR JLNO 82 POLT NO 1213 |
456819 |
INSTALLTION OF NEW SUBMERCIABLE WITH OVERHEAD TANK AT KHURAJ CHATAR JLNO 82 POLT NO 12131 |
Completion of work |
-
latitude : 23.349123168736696
Longitude : 87.6197072211653
file name : Image_04032023172146241.png
|
2023-03-04 17:21:46.346741 |
250 |
66461973 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.399144019931555
Longitude : 87.60311935096979
file name : Image_19072023125849010.png
|
2023-07-19 12:58:49.121323 |
251 |
66461973 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.38688062503934
Longitude : 87.5911861192435
file name : Image_19072023123243833.png
|
2023-07-19 12:32:43.951766 |
252 |
66461973 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.38674353901297
Longitude : 87.5913557689637
file name : Image_19072023123033883.png
|
2023-07-19 12:30:34.016565 |
253 |
66461973 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.386712609790266
Longitude : 87.59138602763414
file name : Image_19072023122815545.png
|
2023-07-19 12:28:15.663884 |
254 |
66461973 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.386663575656712
Longitude : 87.59122811257839
file name : Image_23022023104302351.png
|
2023-02-23 10:43:02.445355 |
255 |
66461997 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.399194227531552
Longitude : 87.6033212710172
file name : Image_19072023125706399.png
|
2023-07-19 12:57:06.511525 |
256 |
66461997 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.399352561682463
Longitude : 87.6033297367394
file name : Image_23022023110041671.png
|
2023-02-23 11:00:41.770458 |
257 |
66461997 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.399456539191306
Longitude : 87.60350148193538
file name : Image_23022023105841763.png
|
2023-02-23 10:58:41.867176 |
258 |
58560842 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM NILU MAYRA HOUSE TO MOSJID TALA AT PARAJ |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM NILU MAYRA HOUSE TO MOSJID TALA AT PARAJ1 |
Roof laid |
-
latitude : 23.3661473,23.3661473
Longitude : 87.6065465,87.6065465
file name : Image_16092023101755893.png
|
2023-09-16 10:17:55.98365 |
259 |
58560842 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM NILU MAYRA HOUSE TO MOSJID TALA AT PARAJ |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM NILU MAYRA HOUSE TO MOSJID TALA AT PARAJ1 |
Plinth level |
-
latitude : 23.366498644463718,23.36648913100362
Longitude : 87.60634085163474,87.6063254289329
file name : Image_16092023101422766.png
|
2023-09-16 10:14:22.843031 |
260 |
58560842 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM NILU MAYRA HOUSE TO MOSJID TALA AT PARAJ |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM NILU MAYRA HOUSE TO MOSJID TALA AT PARAJ1 |
Completion of work |
-
latitude : 23.366574835963547,23.366574835963547
Longitude : 87.60549671016634,87.60549671016634
file name : Image_23022023113545171.png
|
2023-02-23 11:35:45.266335 |
261 |
58624045 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM MATAL HEBRAM HOUSE TO DHANANJOY MARDDI AT JHARUL |
263670 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM MATAL HEBRAM HOUSE TO DHANANJOY MARDDI AT JHARUL1 |
Roof laid |
-
latitude : 23.39992697350681,23.39992697350681
Longitude : 87.60374489240348,87.60374489240348
file name : Image_19072023132607193.png
|
2023-07-19 13:26:07.295779 |
262 |
58624045 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM MATAL HEBRAM HOUSE TO DHANANJOY MARDDI AT JHARUL |
263670 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM MATAL HEBRAM HOUSE TO DHANANJOY MARDDI AT JHARUL1 |
Plinth level |
-
latitude : 23.399598612450063,23.39960561133921
Longitude : 87.60361866094172,87.60362075641751
file name : Image_19072023132247192.png
|
2023-07-19 13:22:47.287345 |
263 |
58624045 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM MATAL HEBRAM HOUSE TO DHANANJOY MARDDI AT JHARUL |
263670 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM MATAL HEBRAM HOUSE TO DHANANJOY MARDDI AT JHARUL1 |
Completion of work |
-
latitude : 23.399572670459747,23.39955766685307
Longitude : 87.60357054881752,87.60357147082686
file name : Image_19072023131924434.png
|
2023-07-19 13:19:24.517069 |
264 |
58624045 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM MATAL HEBRAM HOUSE TO DHANANJOY MARDDI AT JHARUL |
263670 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM MATAL HEBRAM HOUSE TO DHANANJOY MARDDI AT JHARUL1 |
Completion of work |
-
latitude : 23.400098592974246,23.400152320973575
Longitude : 87.60387606918812,87.60384815745056
file name : Image_23022023110316182.png
|
2023-02-23 11:03:16.28845 |
265 |
58380739 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM ILIYAS SEKH TO SASTI PUKUR AT PARAJ |
349703 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM ILIYAS SEKH TO SASTI PUKUR AT PARAJ1 |
Roof laid |
-
latitude : 23.367998460307717
Longitude : 87.60414076969028
file name : Image_16092023094838344.png
|
2023-09-16 09:48:38.434331 |
266 |
58380739 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM ILIYAS SEKH TO SASTI PUKUR AT PARAJ |
349703 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM ILIYAS SEKH TO SASTI PUKUR AT PARAJ1 |
Plinth level |
-
latitude : 23.3680262
Longitude : 87.6036862
file name : Image_19032023104733196.png
|
2023-03-19 10:47:33.289394 |
267 |
58380739 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM ILIYAS SEKH TO SASTI PUKUR AT PARAJ |
349703 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM ILIYAS SEKH TO SASTI PUKUR AT PARAJ1 |
Completion of work |
-
latitude : 23.3680284
Longitude : 87.6037198
file name : Image_19032023104501791.png
|
2023-03-19 10:45:01.875043 |
268 |
58548165 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM RAJA HOUSE TO SANTO MOROL HOUSE AT JAGULIPARA |
349703 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM RAJA HOUSE TO SANTO MOROL HOUSE AT JAGULIPARA1 |
Plinth level |
-
latitude : 23.3389923,23.3389923
Longitude : 87.5969644,87.5969644
file name : Image_07032023100713613.png
|
2023-03-07 10:07:13.701153 |
269 |
58548165 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM RAJA HOUSE TO SANTO MOROL HOUSE AT JAGULIPARA |
349703 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM RAJA HOUSE TO SANTO MOROL HOUSE AT JAGULIPARA1 |
Completion of work |
-
latitude : 23.3389883,23.3389977
Longitude : 87.596963,87.5969691
file name : Image_06032023080306287.png
|
2023-03-06 08:03:06.368683 |
270 |
58548165 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM RAJA HOUSE TO SANTO MOROL HOUSE AT JAGULIPARA |
349703 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM RAJA HOUSE TO SANTO MOROL HOUSE AT JAGULIPARA1 |
Completion of work |
-
latitude : 23.3389883,23.3389977
Longitude : 87.596963,87.5969691
file name : Image_06032023080324641.png
|
2023-03-06 08:03:24.722129 |
271 |
58530387 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM TAPU SINGHA TO ANANDA BAGDI HOUSE AT KHAMARGRAM |
349703 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM TAPU SINGHA TO ANANDA BAGDI HOUSE AT KHAMARGRAM1 |
Plinth level |
-
latitude : 23.404818777926266,23.404818777926266
Longitude : 87.5776755809784,87.5776755809784
file name : Image_19072023113839238.png
|
2023-07-19 11:38:39.343275 |
272 |
58530387 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM TAPU SINGHA TO ANANDA BAGDI HOUSE AT KHAMARGRAM |
349703 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM TAPU SINGHA TO ANANDA BAGDI HOUSE AT KHAMARGRAM1 |
Completion of work |
-
latitude : 23.404778125695884,23.404778125695884
Longitude : 87.5774924363941,87.5774924363941
file name : Image_14032023101525501.png
|
2023-03-14 10:15:25.599258 |
273 |
58530387 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM TAPU SINGHA TO ANANDA BAGDI HOUSE AT KHAMARGRAM |
349703 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM TAPU SINGHA TO ANANDA BAGDI HOUSE AT KHAMARGRAM1 |
Completion of work |
-
latitude : 23.4048083005473,23.404712453484535
Longitude : 87.57769837975502,87.57778856903315
file name : Image_19072023113648520.png
|
2023-07-19 11:36:48.618364 |
274 |
58556240 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM SUBHAS MADHUR HOUSE TO FOOTBALL MATH AT NURKONA |
300000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM SUBHAS MADHUR HOUSE TO FOOTBALL MATH AT NURKONA1 |
Roof laid |
-
latitude : 23.396827848628163,23.396827848628163
Longitude : 87.58267463184893,87.58267463184893
file name : Image_19072023112132061.png
|
2023-07-19 11:21:32.154682 |
275 |
58556240 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM SUBHAS MADHUR HOUSE TO FOOTBALL MATH AT NURKONA |
300000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM SUBHAS MADHUR HOUSE TO FOOTBALL MATH AT NURKONA1 |
Plinth level |
-
latitude : 23.396658492274582,23.39665002655238
Longitude : 87.58260279893875,87.5825746357441
file name : Image_19072023111934531.png
|
2023-07-19 11:19:34.621721 |
276 |
58556240 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM SUBHAS MADHUR HOUSE TO FOOTBALL MATH AT NURKONA |
300000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM SUBHAS MADHUR HOUSE TO FOOTBALL MATH AT NURKONA1 |
Completion of work |
-
latitude : 23.3661307,23.3661307
Longitude : 87.6008313,87.6008313
file name : Image_17052023143950918.png
|
2023-05-17 14:39:51.005527 |
277 |
66462068 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.381061237305403
Longitude : 87.57520434446633
file name : Image_19072023102030360.png
|
2023-07-19 10:20:30.449806 |
278 |
66462068 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.381081731058657
Longitude : 87.57521842606366
file name : Image_19072023101458863.png
|
2023-07-19 10:14:58.955148 |
279 |
66462068 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.366193501278758
Longitude : 87.60073930956423
file name : Image_27042023135323455.png
|
2023-04-27 13:53:23.575119 |
280 |
66462033 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.3945904,23.3945904
Longitude : 87.6021563,87.6021563
file name : Image_19072023130557829.png
|
2023-07-19 13:05:57.915094 |
281 |
66462033 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.3946257,23.3946348
Longitude : 87.602152,87.6021492
file name : Image_19072023130144223.png
|
2023-07-19 13:01:44.323975 |
282 |
66462033 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.394542,23.3945425
Longitude : 87.6021702,87.6021711
file name : Image_23022023110922167.png
|
2023-02-23 11:09:22.258814 |
283 |
39055126 |
KHAMARGRAM DRAIN FROM KARBEL BANDH TO VETARPUKUR |
350000 |
KHAMARGRAM DRAIN FROM KARBEL BANDH TO VETARPUKUR1 |
Roof laid |
-
latitude : 23.410514700226486,23.410514700226486
Longitude : 87.57324364967644,87.57324364967644
file name : Image_19072023114942595.png
|
2023-07-19 11:49:42.740533 |
284 |
39055126 |
KHAMARGRAM DRAIN FROM KARBEL BANDH TO VETARPUKUR |
350000 |
KHAMARGRAM DRAIN FROM KARBEL BANDH TO VETARPUKUR1 |
Plinth level |
-
latitude : 23.41050434857607,23.410501540638506
Longitude : 87.57331539876759,87.57331606931984
file name : Image_19072023114741036.png
|
2023-07-19 11:47:41.146312 |
285 |
39055126 |
KHAMARGRAM DRAIN FROM KARBEL BANDH TO VETARPUKUR |
350000 |
KHAMARGRAM DRAIN FROM KARBEL BANDH TO VETARPUKUR1 |
Completion of work |
-
latitude : 23.41047459281981,23.410472120158374
Longitude : 87.57331606931984,87.57331129163504
file name : Image_19072023114550630.png
|
2023-07-19 11:45:50.756352 |
286 |
39055126 |
KHAMARGRAM DRAIN FROM KARBEL BANDH TO VETARPUKUR |
350000 |
KHAMARGRAM DRAIN FROM KARBEL BANDH TO VETARPUKUR1 |
Completion of work |
-
latitude : 23.3802213,23.3802213
Longitude : 87.6019654,87.6019654
file name : Image_27042023133454912.png
|
2023-04-27 13:34:55.042923 |
287 |
58563620 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM KALITALA TO KAMALESWAR AT KHURAJ |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM KALITALA TO KAMALESWAR AT KHURAJ1 |
Roof laid |
-
latitude : 23.364136959426105,23.364163362421095
Longitude : 87.60268609039485,87.60267024859786
file name : Image_04122023163052703.png
|
2023-12-04 16:30:52.787197 |
288 |
58563620 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM KALITALA TO KAMALESWAR AT KHURAJ |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM KALITALA TO KAMALESWAR AT KHURAJ1 |
Plinth level |
-
latitude : 23.3641950879246,23.364187879487872
Longitude : 87.60265717282891,87.6026560831815
file name : Image_04122023162829180.png
|
2023-12-04 16:28:29.262299 |
289 |
58563620 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM KALITALA TO KAMALESWAR AT KHURAJ |
200000 |
UPGRADATION OF MOORUM ROAD INTO CONCRETE ROAD FROM KALITALA TO KAMALESWAR AT KHURAJ1 |
Completion of work |
-
latitude : 23.349049030803144,23.349261176772416
Longitude : 87.6197986677289,87.61886877939105
file name : Image_04032023171826632.png
|
2023-03-04 17:18:26.731276 |
290 |
34649467 |
MAINTANCE OF GP BUILDING WITH LADIES TOILET |
495405 |
MAINTANCE OF GP BUILDING WITH LADIES TOILET1 |
Roof laid |
-
latitude : 23.3662723
Longitude : 87.6009759
file name : Image_01032024134437374.png
|
2024-03-01 13:44:37.463314 |
291 |
34649467 |
MAINTANCE OF GP BUILDING WITH LADIES TOILET |
495405 |
MAINTANCE OF GP BUILDING WITH LADIES TOILET1 |
Plinth level |
-
latitude : 23.3662723
Longitude : 87.6009757
file name : Image_01032024134159204.png
|
2024-03-01 13:41:59.302028 |
292 |
34649467 |
MAINTANCE OF GP BUILDING WITH LADIES TOILET |
495405 |
MAINTANCE OF GP BUILDING WITH LADIES TOILET1 |
Completion of work |
-
latitude : 23.366333730518818
Longitude : 87.60082120075822
file name : Image_01032024133840745.png
|
2024-03-01 13:38:40.833851 |
293 |
68789409 |
Construction of roads |
334548 |
Construction of roads1 |
Roof laid |
-
latitude : 23.365180000000002,23.365180000000002
Longitude : 87.60102333333334,87.60102333333334
file name : Image_28052024165648145.png
|
2024-05-28 16:56:48.241734 |
294 |
68789409 |
Construction of roads |
334548 |
Construction of roads1 |
Plinth level |
-
latitude : 23.365196666666666,23.365196666666666
Longitude : 87.60097833333333,87.60097833333333
file name : Image_28052024165455278.png
|
2024-05-28 16:54:55.379284 |
295 |
68789409 |
Construction of roads |
334548 |
Construction of roads1 |
Completion of work |
-
latitude : 23.365198333333336,23.365201666666668
Longitude : 87.60101666666667,87.601015
file name : Image_28052024165255449.png
|
2024-05-28 16:52:55.532865 |
296 |
68808739 |
Creation of drainage channel for management of grey water |
400000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.387418333333336
Longitude : 87.59165
file name : Image_06062024160012237.png
|
2024-06-06 16:00:12.330395 |
297 |
68808739 |
Creation of drainage channel for management of grey water |
400000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.387449999999998
Longitude : 87.59163166666667
file name : Image_06062024155805016.png
|
2024-06-06 15:58:05.103364 |
298 |
68808739 |
Creation of drainage channel for management of grey water |
400000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.387416666666663
Longitude : 87.59164833333334
file name : Image_06062024155619898.png
|
2024-06-06 15:56:19.983316 |
299 |
89741248 |
Construction of roads |
220000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.353406666666668,23.353406666666668
Longitude : 87.59442666666668,87.59442666666668
file name : Image_28092024114139990.png
|
2024-09-28 11:41:40.086576 |
300 |
89741248 |
Construction of roads |
220000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.3532129,23.353436666666667
Longitude : 87.5947034,87.59442499999999
file name : Image_28092024114013495.png
|
2024-09-28 11:40:13.58051 |
301 |
89741248 |
Construction of roads |
220000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.353434999999998,23.353443333333335
Longitude : 87.59441333333334,87.59442499999999
file name : Image_28092024113835756.png
|
2024-09-28 11:38:35.845044 |
302 |
89742580 |
Construction of roads |
210681 |
Construction of roads1 |
Plinth level |
-
latitude : 23.3410701,23.3410701
Longitude : 87.5956676,87.5956676
file name : Image_28092024120303520.png
|
2024-09-28 12:03:03.610649 |
303 |
89742580 |
Construction of roads |
210681 |
Construction of roads1 |
Completion of work |
-
latitude : 23.341071,23.340960000000003
Longitude : 87.5956716,87.59509666666666
file name : Image_28092024120137860.png
|
2024-09-28 12:01:37.948628 |
304 |
89741021 |
Construction of roads |
204006 |
Construction of roads1 |
Plinth level |
-
latitude : 23.35614333333333,23.35614333333333
Longitude : 87.58541833333332,87.58541833333332
file name : Image_19112024122907603.png
|
2024-11-19 12:29:07.681814 |
305 |
89741021 |
Construction of roads |
204006 |
Construction of roads1 |
Completion of work |
-
latitude : 23.355603333333338,23.355768333333337
Longitude : 87.58513333333333,87.58518166666666
file name : Image_12112024111437109.png
|
2024-11-12 11:14:37.208237 |
306 |
89774326 |
Construction of roads |
204006 |
Construction of roads1 |
Plinth level |
-
latitude : 23.366065000000003,23.366065000000003
Longitude : 87.60426833333334,87.60426833333334
file name : Image_18112024114044208.png
|
2024-11-18 11:40:44.291458 |
307 |
89774326 |
Construction of roads |
204006 |
Construction of roads1 |
Completion of work |
-
latitude : 23.366246666666665,23.366243333333333
Longitude : 87.60412333333333,87.60407500000001
file name : Image_18112024113751827.png
|
2024-11-18 11:37:51.914774 |
308 |
89773834 |
Drainage Construction |
260225 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.350813333333335
Longitude : 87.61562333333335
file name : Image_28092024102903758.png
|
2024-09-28 10:29:03.837659 |
309 |
89773834 |
Drainage Construction |
260225 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.350826666666663
Longitude : 87.615655
file name : Image_28092024102154757.png
|
2024-09-28 10:21:54.836151 |
310 |
89773834 |
Drainage Construction |
260225 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.350810000000003
Longitude : 87.61561166666667
file name : Image_28092024100916737.png
|
2024-09-28 10:09:16.822761 |
311 |
58567552 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KAREN HOUSE TO NATUN PUKUR AT PARAJ |
350000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KAREN HOUSE TO NATUN PUKUR AT PARAJ1 |
Plinth level |
-
latitude : 23.364275
Longitude : 87.60428833333332
file name : Image_18072024125454449.png
|
2024-07-18 12:54:54.549656 |
312 |
58567552 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KAREN HOUSE TO NATUN PUKUR AT PARAJ |
350000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KAREN HOUSE TO NATUN PUKUR AT PARAJ1 |
Completion of work |
-
latitude : 23.364615000000004
Longitude : 87.60409333333334
file name : Image_18072024125219422.png
|
2024-07-18 12:52:19.508006 |
313 |
58567552 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KAREN HOUSE TO NATUN PUKUR AT PARAJ |
350000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KAREN HOUSE TO NATUN PUKUR AT PARAJ1 |
Completion of work |
-
latitude : 23.364613333333335
Longitude : 87.60410500000002
file name : Image_18072024125222713.png
|
2024-07-18 12:52:22.799757 |
314 |
68790960 |
Construction of Building |
350000 |
Construction of Building1 |
Completion of work |
-
latitude : 23.3662105
Longitude : 87.6007558
file name : Image_11072024161839870.png
|
2024-07-11 16:18:39.974557 |
315 |
68809912 |
Creation of drainage channel for management of grey water |
400000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.357295
Longitude : 87.58659333333331
file name : Image_11072024112013144.png
|
2024-07-11 11:20:13.247391 |
316 |
68809912 |
Creation of drainage channel for management of grey water |
400000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.357446666666668
Longitude : 87.58650666666666
file name : Image_11072024111834991.png
|
2024-07-11 11:18:35.088797 |
317 |
68809912 |
Creation of drainage channel for management of grey water |
400000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.357484999999997
Longitude : 87.58654833333334
file name : Image_11072024111402196.png
|
2024-07-11 11:14:02.285304 |
318 |
89774109 |
Drainage Construction |
220271 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.339886666666665
Longitude : 87.59422
file name : Image_28092024115736391.png
|
2024-09-28 11:57:36.495226 |
319 |
89774109 |
Drainage Construction |
220271 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.33992333333333
Longitude : 87.5942
file name : Image_28092024115616569.png
|
2024-09-28 11:56:16.683094 |
320 |
89774109 |
Drainage Construction |
220271 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.33989166666667
Longitude : 87.59417666666668
file name : Image_28092024115349642.png
|
2024-09-28 11:53:49.728221 |
321 |
89775516 |
Creation of a new source of drinking water |
79755 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.380197
Longitude : 87.6019506
file name : Image_04102024150012937.png
|
2024-10-04 15:00:37.229828 |
322 |
89775516 |
Creation of a new source of drinking water |
79755 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.380197
Longitude : 87.6019506
file name : Image_04102024145405357.png
|
2024-10-04 14:54:05.491156 |
323 |
68803425 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.352863333333335
Longitude : 87.59208166666667
file name : Image_09092024121145411.png
|
2024-09-09 12:11:45.507978 |
324 |
68803425 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.397485
Longitude : 87.60279333333334
file name : Image_25082024155221344.png
|
2024-08-25 15:52:21.455886 |
325 |
68803425 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.397553333333335
Longitude : 87.60280833333333
file name : Image_25082024151440928.png
|
2024-08-25 15:14:41.013135 |
326 |
89772762 |
Drainage Construction |
230000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.358515000000004
Longitude : 87.58588499999999
file name : Image_30082024142750973.png
|
2024-08-30 14:27:51.411659 |
327 |
89772762 |
Drainage Construction |
230000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.358365000000003
Longitude : 87.58596000000001
file name : Image_30082024142038616.png
|
2024-08-30 14:20:38.989794 |
328 |
96149096 |
Creation of a new source of drinking water |
300000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.397448333333333
Longitude : 87.58066666666667
file name : Image_28092024105237842.png
|
2024-09-28 10:52:37.920098 |
329 |
96149096 |
Creation of a new source of drinking water |
300000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.397436666666668
Longitude : 87.58066666666667
file name : Image_28092024105033523.png
|
2024-09-28 10:50:33.597274 |
330 |
96149096 |
Creation of a new source of drinking water |
300000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.397453333333335
Longitude : 87.58070333333332
file name : Image_28092024104823753.png
|
2024-09-28 10:48:23.837086 |
331 |
89772407 |
Drainage Construction |
309099 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.36382833333333
Longitude : 87.60286666666667
file name : Image_30082024110513376.png
|
2024-08-30 11:05:13.515249 |
332 |
89772407 |
Drainage Construction |
309099 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.363845
Longitude : 87.602865
file name : Image_30082024110346744.png
|
2024-08-30 11:03:46.869366 |
333 |
89772407 |
Drainage Construction |
309099 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.363865
Longitude : 87.60284000000001
file name : Image_30082024110156975.png
|
2024-08-30 11:01:57.080718 |
334 |
68810212 |
Creation of drainage channel for management of grey water |
400000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.3673271
Longitude : 87.6079923
file name : Image_23082024114908222.png
|
2024-08-23 11:49:08.322939 |
335 |
68810212 |
Creation of drainage channel for management of grey water |
400000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.3673271
Longitude : 87.6079923
file name : Image_23082024114747342.png
|
2024-08-23 11:47:47.456388 |
336 |
68810212 |
Creation of drainage channel for management of grey water |
400000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.36705833333333
Longitude : 87.60928166666666
file name : Image_23082024114545903.png
|
2024-08-23 11:45:46.022797 |