1 |
34350280 |
NEW ROAD FROM SUDHIR BAURI HOUSE TO JUGI GORE AT SAN I |
249351 |
NEW ROAD FROM SUDHIR BAURI HOUSE TO JUGI GORE AT SAN I1 |
Completion of work |
-

latitude : 23.73900978360325,23.738982710056007
Longitude : 87.18852879479527,87.18856492079794
file name : Image_22032021141145870.png
|
2021-03-22 14:11:46.01003 |
2 |
34350280 |
NEW ROAD FROM SUDHIR BAURI HOUSE TO JUGI GORE AT SAN I |
249351 |
NEW ROAD FROM SUDHIR BAURI HOUSE TO JUGI GORE AT SAN I1 |
Completion of work |
-

latitude : 23.73900978360325,23.738982710056007
Longitude : 87.18852879479527,87.18856492079794
file name : Image_22032021141107530.png
|
2021-03-22 14:11:07.665458 |
3 |
34350280 |
NEW ROAD FROM SUDHIR BAURI HOUSE TO JUGI GORE AT SAN I |
249351 |
NEW ROAD FROM SUDHIR BAURI HOUSE TO JUGI GORE AT SAN I1 |
Completion of work |
-

latitude : 23.738381853327155,23.738309643231332,23.738407837226987
Longitude : 87.17955906875432,87.17964087612927,87.17956493608654
file name : Image_22032021141955179.png
|
2021-03-22 14:19:55.321247 |
4 |
34486838 |
PUCCA DRAIN AT HB DHANGAR HOUSE TO MONDAL POND AT 36 GONDA |
259071 |
PUCCA DRAIN AT HB DHANGAR HOUSE TO MONDAL POND AT 36 GONDA1 |
Completion of work |
-

latitude : 23.733933954499662,23.7344190152362
Longitude : 87.21756387501955,87.2179691400379
file name : Image_28072021150956496.png
|
2021-07-28 15:09:56.598046 |
5 |
34637625 |
CONST OF PUCCA DRAIN SIDE OF SCHOOLPARA PAKA RASTA |
150426 |
CONST OF PUCCA DRAIN SIDE OF SCHOOLPARA PAKA RASTA1 |
Completion of work |
-

latitude : 23.73431499581784,23.73431499581784,23.73431499581784
Longitude : 87.21792773343623,87.21792773343623,87.21792773343623
file name : Image_23062021161254577.png
|
2021-06-23 16:12:54.640522 |
6 |
34409094 |
CONST OF PCC DRAIN FROM TAPAN BAURI HOUSE TO SCHOOL POND |
149753 |
CONST OF PCC DRAIN FROM TAPAN BAURI HOUSE TO SCHOOL POND1 |
Completion of work |
-

latitude : 23.739933972246945,23.740026215091348,23.74004561919719,23.740040506236255
Longitude : 87.18821422196925,87.18820718117058,87.18812394887209,87.18811850063503
file name : Image_24062021190922190.png
|
2021-06-24 19:09:22.244001 |
7 |
34565939 |
PCC ROAD FROM CHAINA RUIDAS HOUSE TO SAMIR RUIDAS HOUSE |
88486 |
PCC ROAD FROM CHAINA RUIDAS HOUSE TO SAMIR RUIDAS HOUSE1 |
Completion of work |
-

latitude : 23.722170372493565,23.72216848656535
Longitude : 87.21147693693638,87.2111513838172
file name : Image_25062021141318625.png
|
2021-06-25 14:13:18.700222 |
8 |
34553418 |
PCC ROAD FROM MONDAL PARA TO MANASA MANDIR |
249715 |
PCC ROAD FROM MONDAL PARA TO MANASA MANDIR1 |
Completion of work |
-

latitude : 23.718802188523114,23.718613092787564,23.718596789985895
Longitude : 87.21108441241086,87.21113638021052,87.21114970743656
file name : Image_25062021141326619.png
|
2021-06-25 14:13:26.700098 |
9 |
34553418 |
PCC ROAD FROM MONDAL PARA TO MANASA MANDIR |
249715 |
PCC ROAD FROM MONDAL PARA TO MANASA MANDIR1 |
Completion of work |
-

latitude : 23.718802188523114,23.718613092787564,23.718596789985895
Longitude : 87.21108441241086,87.21113638021052,87.21114970743656
file name : Image_25062021141330832.png
|
2021-06-25 14:13:30.902465 |
10 |
34574172 |
PCC ROAD FROM SK SELIM HOUSE TO NIYAMAT HOUSE |
73583 |
PCC ROAD FROM SK SELIM HOUSE TO NIYAMAT HOUSE1 |
Completion of work |
-

latitude : 23.721319399774075,23.721319399774075,23.721506274305284
Longitude : 87.20913268625736,87.20913268625736,87.20915850251913
file name : Image_25062021141322487.png
|
2021-06-25 14:13:22.55442 |
11 |
34555922 |
CONST OF PCC ROAD BESIDE SS VIDYAPITH |
56496 |
CONST OF PCC ROAD BESIDE SS VIDYAPITH1 |
Completion of work |
-

latitude : 23.717994214966893,23.717966261319816,23.718012822791934
Longitude : 87.21584374085069,87.21583385020494,87.21582856960595
file name : Image_25062021144928394.png
|
2021-06-25 14:49:28.489301 |
12 |
34420960 |
CONST OF PCC ROAD FROM JOROLI POND TO KAZI HASIBUL HOUSE |
189836 |
CONST OF PCC ROAD FROM JOROLI POND TO KAZI HASIBUL HOUSE1 |
Completion of work |
-

latitude : 23.738323473371565,23.738513784483075
Longitude : 87.17936066910625,87.1796324942261
file name : Image_14072021160442736.png
|
2021-07-14 16:04:42.800196 |
13 |
34483331 |
CONST OF 2 NOS DUSTBIN AT SAN VI |
92323 |
CONST OF 2 NOS DUSTBIN AT SAN VI1 |
Completion of work |
-

latitude : 23.739675851538777
Longitude : 87.2061521653086
file name : Image_20092021181236593.png
|
2021-09-20 18:12:36.660246 |
14 |
34486017 |
PCC ROAD FROM SUNIL KARMAKAR HOUSE TO DHANGARPARA MAIN ROAD |
146773 |
PCC ROAD FROM SUNIL KARMAKAR HOUSE TO DHANGARPARA MAIN ROAD1 |
Completion of work |
-

latitude : 23.735095476731658,23.735064757056534
Longitude : 87.21827893517911,87.21774861216545
file name : Image_24112021161428130.png
|
2021-11-24 16:14:28.238766 |
15 |
34638708 |
LADIES CHANGING ROOM NEAR ALINAGAR SITABANDH GHAT |
61227 |
LADIES CHANGING ROOM NEAR ALINAGAR SITABANDH GHAT1 |
Completion of work |
-

latitude : 23.718010769225657
Longitude : 87.20256437547505
file name : Image_10122021123534943.png
|
2021-12-10 12:35:35.04248 |
16 |
34485427 |
PCC ROAD FROM NARAN PAL HOUSE TO 36 GONDA FP SCHOOL |
199633 |
PCC ROAD FROM NARAN PAL HOUSE TO 36 GONDA FP SCHOOL1 |
Completion of work |
-

latitude : 23.73913718853146,23.73937087599188
Longitude : 87.2195350471884,87.21967016346753
file name : Image_13122021155723362.png
|
2021-12-13 15:57:23.465441 |
17 |
34482862 |
2 NOS LADIES CHANGING ROOM NEAR BENE GHAT SANSAD VI |
99360 |
2 NOS LADIES CHANGING ROOM NEAR BENE GHAT SANSAD VI1 |
Completion of work |
-

latitude : 23.740321886725724
Longitude : 87.20800431445241
file name : Image_30122021121353754.png
|
2021-12-30 12:13:53.868998 |
18 |
34421543 |
CONST OF PCC ROAD FROM GUIRAM HOUSE TO MADHAI MONDAL |
156924 |
CONST OF PCC ROAD FROM GUIRAM HOUSE TO MADHAI MONDAL1 |
Completion of work |
-

latitude : 23.736087391152978,23.73597264289856
Longitude : 87.18193039298058,87.18221780844033
file name : Image_27122021142602564.png
|
2021-12-27 14:26:02.656343 |
19 |
34480037 |
PCC ROAD FROM BHOLA PASWAN HOUSE TO MANIK BAURI HOUSE |
199455 |
PCC ROAD FROM BHOLA PASWAN HOUSE TO MANIK BAURI HOUSE1 |
Completion of work |
-

latitude : 23.74000354204327,23.739983257837594
Longitude : 87.21195789054036,87.21197289414704
file name : Image_27122021142630223.png
|
2021-12-27 14:26:30.305858 |
20 |
34480037 |
PCC ROAD FROM BHOLA PASWAN HOUSE TO MANIK BAURI HOUSE |
199455 |
PCC ROAD FROM BHOLA PASWAN HOUSE TO MANIK BAURI HOUSE1 |
Completion of work |
-

latitude : 23.740034052170813,23.74001992866397
Longitude : 87.21193626523018,87.21224723383784
file name : Image_27122021142625242.png
|
2021-12-27 14:26:25.315466 |
21 |
34480037 |
PCC ROAD FROM BHOLA PASWAN HOUSE TO MANIK BAURI HOUSE |
199455 |
PCC ROAD FROM BHOLA PASWAN HOUSE TO MANIK BAURI HOUSE1 |
Completion of work |
-

latitude : 23.74000354204327,23.739983257837594
Longitude : 87.21195789054036,87.21197289414704
file name : Image_27122021142612898.png
|
2021-12-27 14:26:12.982409 |
22 |
34480037 |
PCC ROAD FROM BHOLA PASWAN HOUSE TO MANIK BAURI HOUSE |
199455 |
PCC ROAD FROM BHOLA PASWAN HOUSE TO MANIK BAURI HOUSE1 |
Completion of work |
-

latitude : 23.740034052170813,23.74001992866397
Longitude : 87.21193626523018,87.21224723383784
file name : Image_27122021142607577.png
|
2021-12-27 14:26:07.66532 |
23 |
34555030 |
CONST OF BOUNDARY WALL AT ICDS CENTRE |
150847 |
CONST OF BOUNDARY WALL AT ICDS CENTRE1 |
Completion of work |
-

latitude : 23.71503569651395
Longitude : 87.21702659502625
file name : Image_30122021121346750.png
|
2021-12-30 12:13:46.912201 |
24 |
34486551 |
CONST OF DUSTBIN NEAR 36GONDA DASPARA COMMUNITY HALL |
57653 |
CONST OF DUSTBIN NEAR 36GONDA DASPARA COMMUNITY HALL1 |
Completion of work |
-

latitude : 23.73270634096116
Longitude : 87.21670045517385
file name : Image_03012022103513433.png
|
2022-01-03 10:35:13.538219 |
25 |
34486302 |
PUCCA DRAIN FROM RUDAL PASWAN HOUSE TO PWD ROAD |
251126 |
PUCCA DRAIN FROM RUDAL PASWAN HOUSE TO PWD ROAD1 |
Completion of work |
-

latitude : 23.718783,23.73259259853512,23.732596831396222
Longitude : 87.2126332,87.21624607220292,87.21624288707972
file name : Image_18022022083525252.png
|
2022-02-18 08:35:25.332484 |
26 |
34486302 |
PUCCA DRAIN FROM RUDAL PASWAN HOUSE TO PWD ROAD |
251126 |
PUCCA DRAIN FROM RUDAL PASWAN HOUSE TO PWD ROAD1 |
Completion of work |
-

latitude : 23.73266879003495,23.732709693722427,23.73251896351576,23.7187862,23.7187862
Longitude : 87.2161104530096,87.2161003947258,87.21623668447137,87.2126306,87.2126306
file name : Image_22012022133244920.png
|
2022-01-22 13:32:45.031066 |
27 |
34478427 |
CONST LADIES CHANGING ROOM NEAR BHANGARE GHAT SANSAD V |
204626 |
CONST LADIES CHANGING ROOM NEAR BHANGARE GHAT SANSAD V1 |
Completion of work |
-

latitude : 23.740126588381827
Longitude : 87.20387538895011
file name : Image_06012022124304896.png
|
2022-01-06 12:43:05.001722 |
28 |
34410630 |
INSTALLATION OF TUBEWELL AT FARFARI FOOTBALL GROUND |
280063 |
INSTALLATION OF TUBEWELL AT FARFARI FOOTBALL GROUND1 |
Completion of work |
-

latitude : 23.740361407399178
Longitude : 87.18878192827106
file name : Image_23022022141309225.png
|
2022-02-23 14:13:09.302792 |
29 |
34484858 |
CONST OF DUSTBIN AT 36 GONDA AJOY RIVER SAMSHAN GHAT |
97949 |
CONST OF DUSTBIN AT 36 GONDA AJOY RIVER SAMSHAN GHAT1 |
Completion of work |
-

latitude : 23.73831735458225
Longitude : 87.22264070995152
file name : Image_23022022133109089.png
|
2022-02-23 13:31:09.187357 |
30 |
34424373 |
INSTAL OF TUBEWELL AT BHURI DANGALPARA |
309992 |
INSTAL OF TUBEWELL AT BHURI DANGALPARA1 |
Completion of work |
-

latitude : 23.73207610566169
Longitude : 87.18048049136996
file name : Image_23022022144509875.png
|
2022-02-23 14:45:09.999978 |
31 |
34636221 |
INSTAL OF TUBEWELL AT NIMSHA PASCHIMPARA NORTHSIDE |
280809 |
INSTAL OF TUBEWELL AT NIMSHA PASCHIMPARA NORTHSIDE1 |
Completion of work |
-

latitude : 23.721590512432158
Longitude : 87.20819265581667
file name : Image_28022022162143723.png
|
2022-02-28 16:21:43.811141 |
32 |
34638391 |
LADIES CHANGING ROOM NEAR ALINAGAR LAW GHAT |
99807 |
LADIES CHANGING ROOM NEAR ALINAGAR LAW GHAT1 |
Completion of work |
-

latitude : 23.72204497
Longitude : 87.19877934
file name : Image_13052022132322903.png
|
2022-05-13 13:23:23.00079 |
33 |
34638391 |
LADIES CHANGING ROOM NEAR ALINAGAR LAW GHAT |
99807 |
LADIES CHANGING ROOM NEAR ALINAGAR LAW GHAT1 |
Completion of work |
-

latitude : 23.72202738
Longitude : 87.19876722
file name : Image_13052022132330755.png
|
2022-05-13 13:23:30.846064 |
34 |
34638391 |
LADIES CHANGING ROOM NEAR ALINAGAR LAW GHAT |
99807 |
LADIES CHANGING ROOM NEAR ALINAGAR LAW GHAT1 |
Completion of work |
-

latitude : 23.72204179
Longitude : 87.1987666
file name : Image_13052022132326759.png
|
2022-05-13 13:23:26.848347 |
35 |
34638391 |
LADIES CHANGING ROOM NEAR ALINAGAR LAW GHAT |
99807 |
LADIES CHANGING ROOM NEAR ALINAGAR LAW GHAT1 |
Completion of work |
-

latitude : 23.72204497
Longitude : 87.19877934
file name : Image_13052022132335044.png
|
2022-05-13 13:23:35.13459 |
36 |
34638391 |
LADIES CHANGING ROOM NEAR ALINAGAR LAW GHAT |
99807 |
LADIES CHANGING ROOM NEAR ALINAGAR LAW GHAT1 |
Completion of work |
-

latitude : 23.72204179
Longitude : 87.1987666
file name : Image_13052022132339192.png
|
2022-05-13 13:23:39.279006 |
37 |
34638391 |
LADIES CHANGING ROOM NEAR ALINAGAR LAW GHAT |
99807 |
LADIES CHANGING ROOM NEAR ALINAGAR LAW GHAT1 |
Completion of work |
-

latitude : 23.72202738
Longitude : 87.19876722
file name : Image_13052022132343048.png
|
2022-05-13 13:23:43.141292 |
38 |
34429654 |
PCC ROAD FROM JAMAL HOUSE TO ADESH DUSAD |
154087 |
PCC ROAD FROM JAMAL HOUSE TO ADESH DUSAD1 |
Completion of work |
-

latitude : 23.740234840661287,23.7404243
Longitude : 87.20979200676084,87.2095052
file name : Image_18032021174419821.png
|
2021-03-18 17:44:19.916306 |
39 |
34429654 |
PCC ROAD FROM JAMAL HOUSE TO ADESH DUSAD |
154087 |
PCC ROAD FROM JAMAL HOUSE TO ADESH DUSAD1 |
Completion of work |
-

latitude : 23.740444304421544,23.7404287
Longitude : 87.20940669067204,87.2095118
file name : Image_22032021141055537.png
|
2021-03-22 14:10:55.686791 |
40 |
48656934 |
CONST OF PCC ROAD FROM NIMSHA SURAIKA DANGA TO MAIN ROAD NEAR SHIB MANDIR |
235000 |
CONST OF PCC ROAD FROM NIMSHA SURAIKA DANGA TO MAIN ROAD NEAR SHIB MANDIR1 |
Completion of work |
-

latitude : 23.7190893,23.7190969
Longitude : 87.21659573,87.21658
file name : Image_16102023225703725.png
|
2023-10-16 22:57:03.825247 |
41 |
48656934 |
CONST OF PCC ROAD FROM NIMSHA SURAIKA DANGA TO MAIN ROAD NEAR SHIB MANDIR |
235000 |
CONST OF PCC ROAD FROM NIMSHA SURAIKA DANGA TO MAIN ROAD NEAR SHIB MANDIR1 |
Plinth level |
-

latitude : 23.71391542,23.7138159
Longitude : 87.21418129,87.21422094
file name : Image_09082024133851488.png
|
2024-08-09 13:38:51.63299 |
42 |
48656934 |
CONST OF PCC ROAD FROM NIMSHA SURAIKA DANGA TO MAIN ROAD NEAR SHIB MANDIR |
235000 |
CONST OF PCC ROAD FROM NIMSHA SURAIKA DANGA TO MAIN ROAD NEAR SHIB MANDIR1 |
Roof laid |
-

latitude : 23.7202617,23.7202617
Longitude : 87.2128102,87.2128102
file name : Image_21082024155608909.png
|
2024-08-21 15:56:09.072388 |
43 |
97994116 |
Creation of a new source of drinking water |
89900 |
RENOVATION OF WELL NEAR SATU PAL HOUSE AT SANSAD VIII out of 15TH FC |
Completion of work |
-

latitude : 23.73808942
Longitude : 87.21920782
file name : Image_30122024122755878.png
|
2024-12-30 12:27:55.964048 |
44 |
97994116 |
Creation of a new source of drinking water |
89900 |
RENOVATION OF WELL NEAR SATU PAL HOUSE AT SANSAD VIII out of 15TH FC |
Plinth level |
-

latitude : 23.73808721
Longitude : 87.21916228
file name : Image_30122024123016232.png
|
2024-12-30 12:30:16.309002 |
45 |
97994116 |
Creation of a new source of drinking water |
89900 |
RENOVATION OF WELL NEAR SATU PAL HOUSE AT SANSAD VIII out of 15TH FC |
Roof laid |
-

latitude : 23.7381343
Longitude : 87.21909763
file name : Image_30122024123344517.png
|
2024-12-30 12:33:44.594114 |
46 |
94230109 |
Creation of a new source of drinking water |
75000 |
Maintenance and repairing of Drinking water systems at Shyamla Village OUT OF 15TH FC |
Completion of work |
-

latitude : 23.73962991
Longitude : 87.20488438
file name : Image_30122024125820651.png
|
2024-12-30 12:58:20.792278 |
47 |
94230109 |
Creation of a new source of drinking water |
75000 |
Maintenance and repairing of Drinking water systems at Shyamla Village OUT OF 15TH FC |
Plinth level |
-

latitude : 23.73962759
Longitude : 87.20489837
file name : Image_30122024125936616.png
|
2024-12-30 12:59:36.759959 |
48 |
94230109 |
Creation of a new source of drinking water |
75000 |
Maintenance and repairing of Drinking water systems at Shyamla Village OUT OF 15TH FC |
Roof laid |
-

latitude : 23.73959674
Longitude : 87.20492285
file name : Image_30122024130039441.png
|
2024-12-30 13:00:39.553194 |
49 |
67368166 |
Green Fencing and Plantation |
99400 |
INFRASTRUCTURE OF DEVELOPMENT WITH PLANTATION DIHIPARA PLAY GROUND AT KHOTTADIHI OUT OF 15TH FC |
Completion of work |
-

latitude : 23.7150635,23.7150635
Longitude : 87.2131492,87.2131492
file name : Image_30122024142342967.png
|
2024-12-30 14:23:43.058242 |
50 |
67368166 |
Green Fencing and Plantation |
99400 |
INFRASTRUCTURE OF DEVELOPMENT WITH PLANTATION DIHIPARA PLAY GROUND AT KHOTTADIHI OUT OF 15TH FC |
Plinth level |
-

latitude : 23.7161615,23.7161615
Longitude : 87.2122154,87.2122154
file name : Image_30122024142606336.png
|
2024-12-30 14:26:06.425623 |
51 |
67368166 |
Green Fencing and Plantation |
99400 |
INFRASTRUCTURE OF DEVELOPMENT WITH PLANTATION DIHIPARA PLAY GROUND AT KHOTTADIHI OUT OF 15TH FC |
Roof laid |
-

latitude : 23.71468393,23.71468444
Longitude : 87.21093629,87.21093797
file name : Image_30122024142736806.png
|
2024-12-30 14:27:34.359826 |
52 |
48681920 |
RENOVATION OF WELL NEAR MOHAN RUIDAS HOUSE |
80222 |
RENOVATION OF WELL NEAR MOHAN RUIDAS HOUSE1 |
Completion of work |
-

latitude : 23.7134188
Longitude : 87.21035676
file name : Image_26012023152623911.png
|
2023-01-26 15:26:23.964925 |
53 |
58115079 |
RENOVATION OF WELL NEAR BAIDYANATH PASI HOUSE AT SAN VI |
74903 |
RENOVATION OF WELL NEAR BAIDYANATH PASI HOUSE AT SAN VI1 |
Completion of work |
-

latitude : 23.73924464
Longitude : 87.21268468
file name : Image_14032023170603110.png
|
2023-03-14 17:06:03.174257 |
54 |
34494171 |
PCC ROAD FROM DANGALPARA MAIN ROAD TO JADUPATI RANA HOUSE |
136435 |
PCC ROAD FROM DANGALPARA MAIN ROAD TO JADUPATI RANA HOUSE1 |
Completion of work |
-

latitude : 23.71439755,23.71438906
Longitude : 87.21512236,87.21517011
file name : Image_28022023184341184.png
|
2023-02-28 18:43:41.26674 |
55 |
34494171 |
PCC ROAD FROM DANGALPARA MAIN ROAD TO JADUPATI RANA HOUSE |
136435 |
PCC ROAD FROM DANGALPARA MAIN ROAD TO JADUPATI RANA HOUSE1 |
Plinth level |
-

latitude : 23.71364541,23.71366774
Longitude : 87.21461453,87.21423147
file name : Image_09082024135239579.png
|
2024-08-09 13:52:39.673964 |
56 |
34494171 |
PCC ROAD FROM DANGALPARA MAIN ROAD TO JADUPATI RANA HOUSE |
136435 |
PCC ROAD FROM DANGALPARA MAIN ROAD TO JADUPATI RANA HOUSE1 |
Roof laid |
-

latitude : 23.7136369,23.71363385
Longitude : 87.2143785,87.21438695
file name : Image_09082024135434627.png
|
2024-08-09 13:54:34.713179 |
57 |
34428905 |
CONST OF MAIN GATE OF UTTESWAR PARK AT SHYAMLA VILLAGE |
262528 |
CONST OF MAIN GATE OF UTTESWAR PARK AT SHYAMLA VILLAGE1 |
Completion of work |
-

latitude : 23.74018987,23.74019673
Longitude : 87.19047188,87.19047976
file name : Image_20052022164630049.png
|
2022-05-20 16:46:30.192354 |
58 |
48656997 |
INSTALLATION OF TUBEWELL AT SCHOOLPARA |
249234 |
INSTALLATION OF TUBEWELL AT SCHOOLPARA1 |
Completion of work |
-

latitude : 23.72103212
Longitude : 87.20421183
file name : Image_25082022131218992.png
|
2022-08-25 13:12:19.098655 |
59 |
34636979 |
PCC ROAD FROM PINTU GHOSH HOUSE TO LAXMIKANTA HOUSE |
155204 |
PCC ROAD FROM PINTU GHOSH HOUSE TO LAXMIKANTA HOUSE1 |
Completion of work |
-

latitude : 23.7220092,23.7221625
Longitude : 87.20335702,87.2031111
file name : Image_13052022132318245.png
|
2022-05-13 13:23:18.346847 |
60 |
34481283 |
PUCCA DRAIN FROM UJJWAL DUTTA HOUSE TO GAYA BAURI |
169858 |
PUCCA DRAIN FROM UJJWAL DUTTA HOUSE TO GAYA BAURI1 |
Completion of work |
-

latitude : 23.74016359,23.74018505
Longitude : 87.20627883,87.20626323
file name : Image_13052022155300072.png
|
2022-05-13 15:53:00.16753 |
61 |
34481283 |
PUCCA DRAIN FROM UJJWAL DUTTA HOUSE TO GAYA BAURI |
169858 |
PUCCA DRAIN FROM UJJWAL DUTTA HOUSE TO GAYA BAURI1 |
Completion of work |
-

latitude : 23.74021155,23.74013301
Longitude : 87.20619003,87.20628961
file name : Image_13052022155234329.png
|
2022-05-13 15:52:34.422243 |
62 |
34481283 |
PUCCA DRAIN FROM UJJWAL DUTTA HOUSE TO GAYA BAURI |
169858 |
PUCCA DRAIN FROM UJJWAL DUTTA HOUSE TO GAYA BAURI1 |
Completion of work |
-

latitude : 23.74016359,23.74018505
Longitude : 87.20627883,87.20626323
file name : Image_20052022152823445.png
|
2022-05-20 15:28:23.558646 |
63 |
34488287 |
PUCCA DRAIN FROM BILU BAURI HOUSE TO SK NASIB HOUSE |
77953 |
PUCCA DRAIN FROM BILU BAURI HOUSE TO SK NASIB HOUSE1 |
Completion of work |
-

latitude : 23.71501259,23.71500214
Longitude : 87.20962712,87.20952941
file name : Image_02052022082457536.png
|
2022-05-02 08:24:57.669015 |
64 |
38909818 |
CONST. OF PUCCA DRAIN FROM KRISTA BAURI HOUSE TO DILIP MONDAL HOUSE AT TAPANPUR |
99930 |
CONST. OF PUCCA DRAIN FROM KRISTA BAURI HOUSE TO DILIP MONDAL HOUSE AT TAPANPUR1 |
Completion of work |
-

latitude : 23.71289595,23.71289088
Longitude : 87.21446992,87.21447035
file name : Image_02052022081804230.png
|
2022-05-02 08:18:04.318212 |
65 |
34563004 |
CONST OF WATER TANK AT SS VIDYAPITH |
298281 |
CONST OF WATER TANK AT SS VIDYAPITH1 |
Completion of work |
-

latitude : 23.71827192
Longitude : 87.21569615
file name : Image_02052022084501244.png
|
2022-05-02 08:45:01.373525 |
66 |
34563004 |
CONST OF WATER TANK AT SS VIDYAPITH |
298281 |
CONST OF WATER TANK AT SS VIDYAPITH1 |
Completion of work |
-

latitude : 23.71826622
Longitude : 87.21567283
file name : Image_02052022084237076.png
|
2022-05-02 08:42:37.190765 |
67 |
34640118 |
NATURAL PARK AT UTTESWAR FOR BIODIVERSITY |
102769 |
NATURAL PARK AT UTTESWAR FOR BIODIVERSITY1 |
Completion of work |
-

latitude : 23.74432783,23.74455997
Longitude : 87.19040236,87.19051856
file name : Image_02052022073601184.png
|
2022-05-02 07:36:01.323117 |
68 |
34566575 |
CONST OF COMMUNITY HALL AT NIMSHA RUIDASPARA |
310615 |
CONST OF COMMUNITY HALL AT NIMSHA RUIDASPARA1 |
Completion of work |
-

latitude : 23.72187175
Longitude : 87.20991282
file name : Image_06062022152616122.png
|
2022-06-06 15:26:16.221161 |
69 |
34556845 |
PUCCA DRAIN FROM BIJAN BANERJEE HOUSE TO MANTU BAURI HOUSE |
232832 |
PUCCA DRAIN FROM BIJAN BANERJEE HOUSE TO MANTU BAURI HOUSE1 |
Completion of work |
-

latitude : 23.7135131,23.71310237
Longitude : 87.21496587,87.2152141
file name : Image_24062022175040872.png
|
2022-06-24 17:50:40.983612 |
70 |
34493826 |
CONST OF SOAKPIT NEAR BY AKAL BAURI TUBEWELL |
54340 |
CONST OF SOAKPIT NEAR BY AKAL BAURI TUBEWELL1 |
Completion of work |
-

latitude : 23.7147442
Longitude : 87.21079446
file name : Image_02082022141250197.png
|
2022-08-02 14:12:50.325605 |
71 |
48656706 |
CONST OF PCC ROAD FROM EKKA BAURI HOUSE TO SEKH RAFIK HOUSE |
148586 |
CONST OF PCC ROAD FROM EKKA BAURI HOUSE TO SEKH RAFIK HOUSE1 |
Completion of work |
-

latitude : 23.73748616,23.715501
Longitude : 87.21717237,87.21044085
file name : Image_14072022170027777.png
|
2022-07-14 17:00:27.907493 |
72 |
48656951 |
CONST OF PCC ROAD FROM MAIN ROAD TO SK KAMAL HOUSE |
199092 |
CONST OF PCC ROAD FROM MAIN ROAD TO SK KAMAL HOUSE1 |
Completion of work |
-

latitude : 23.7201871,23.7201689,23.72000121
Longitude : 87.20150727,87.20161686,87.2018897
file name : Image_01122022165951754.png
|
2022-12-01 16:59:51.845907 |
73 |
48656951 |
CONST OF PCC ROAD FROM MAIN ROAD TO SK KAMAL HOUSE |
199092 |
CONST OF PCC ROAD FROM MAIN ROAD TO SK KAMAL HOUSE1 |
Completion of work |
-

latitude : 23.72054339,23.7201959
Longitude : 87.20796655,87.20784345
file name : Image_21072022145700232.png
|
2022-07-21 14:57:00.361256 |
74 |
34480600 |
PCC ROAD FROM BIJOY SINGH HOUSE TO TAPAN MALLIK HOUSE |
150000 |
PCC ROAD FROM BIJOY SINGH HOUSE TO TAPAN MALLIK HOUSE1 |
Roof laid |
-

latitude : 23.7403685,23.7403685
Longitude : 87.2098992,87.2098992
file name : Image_10032023123621744.png
|
2023-03-10 12:36:21.817577 |
75 |
34429396 |
PCC ROAD FROM KALI MANDIR TO BANSTALA AT SHYAMLA COLLIERY |
150000 |
PCC ROAD FROM KALI MANDIR TO BANSTALA AT SHYAMLA COLLIERY1 |
Roof laid |
-

latitude : 23.7392804,23.73928965
Longitude : 87.2118299,87.21181871
file name : Image_31032023181831547.png
|
2023-03-31 18:18:31.631087 |
76 |
58157295 |
CONST OF PCC ROAD FROM NIMTALA TO SEKH MUSTAK HOUSE AT SAN XIII |
285000 |
CONST OF PCC ROAD FROM NIMTALA TO SEKH MUSTAK HOUSE AT SAN XIII1 |
Plinth level |
-

latitude : 23.72110762,23.72111762
Longitude : 87.20813333,87.20812113
file name : Image_20032023170845223.png
|
2023-03-20 17:08:45.279184 |
77 |
48682200 |
RENOVATION OF 6 NOS GOVT WELL AT TAPANPUR COLONY |
150000 |
RENOVATION OF 6 NOS GOVT WELL AT TAPANPUR COLONY1 |
Completion of work |
-

latitude : 23.71793784
Longitude : 87.21340226
file name : Image_31032023132059981.png
|
2023-03-31 13:21:00.049233 |
78 |
48682200 |
RENOVATION OF 6 NOS GOVT WELL AT TAPANPUR COLONY |
150000 |
RENOVATION OF 6 NOS GOVT WELL AT TAPANPUR COLONY1 |
Completion of work |
-

latitude : 23.71794723
Longitude : 87.21337792
file name : Image_31032023132054523.png
|
2023-03-31 13:20:54.849637 |
79 |
48682200 |
RENOVATION OF 6 NOS GOVT WELL AT TAPANPUR COLONY |
150000 |
RENOVATION OF 6 NOS GOVT WELL AT TAPANPUR COLONY1 |
Completion of work |
-

latitude : 23.71795586
Longitude : 87.21318548
file name : Image_09082024130643998.png
|
2024-08-09 13:06:44.077646 |
80 |
48682200 |
RENOVATION OF 6 NOS GOVT WELL AT TAPANPUR COLONY |
150000 |
RENOVATION OF 6 NOS GOVT WELL AT TAPANPUR COLONY1 |
Completion of work |
-

latitude : 23.71350912
Longitude : 87.2143107
file name : Image_09082024134157550.png
|
2024-08-09 13:41:57.647012 |
81 |
38909771 |
RENOVATION OF WELL AT TAPANPUR COLONY |
50000 |
RENOVATION OF WELL AT TAPANPUR COLONY1 |
Plinth level |
-

latitude : 23.71209462
Longitude : 87.21419104
file name : Image_06042023140739061.png
|
2023-04-06 14:07:39.117906 |
82 |
38909771 |
RENOVATION OF WELL AT TAPANPUR COLONY |
50000 |
RENOVATION OF WELL AT TAPANPUR COLONY1 |
Plinth level |
-

latitude : 23.71209016
Longitude : 87.21417364
file name : Image_06042023140745817.png
|
2023-04-06 14:07:45.879314 |
83 |
48682032 |
RENOVATION OF GOVT WELL NEAR MONOJ MONDAL HOUSE |
90000 |
RENOVATION OF GOVT WELL NEAR MONOJ MONDAL HOUSE1 |
Roof laid |
-

latitude : 23.65314286
Longitude : 87.12586824
file name : Image_05042023163439925.png
|
2023-04-05 16:34:39.983775 |
84 |
48682032 |
RENOVATION OF GOVT WELL NEAR MONOJ MONDAL HOUSE |
90000 |
RENOVATION OF GOVT WELL NEAR MONOJ MONDAL HOUSE1 |
Roof laid |
-

latitude : 23.72026267
Longitude : 87.21297214
file name : Image_09082024141301431.png
|
2024-08-09 14:13:01.508893 |
85 |
48682396 |
REPAIRING OF DUGWELL AT BHURI |
95000 |
REPAIRING OF DUGWELL AT BHURI1 |
Plinth level |
-

latitude : 23.744100000000003
Longitude : 87.17871833333332
file name : Image_10052023185811034.png
|
2023-05-10 18:58:11.154907 |
86 |
34488741 |
PCC ROAD FROM KARTIK RUIDAS HOUSE TO BHAGYADHAR HOUSE |
299202 |
PCC ROAD FROM KARTIK RUIDAS HOUSE TO BHAGYADHAR HOUSE1 |
Completion of work |
-

latitude : 23.71441786,23.71406334
Longitude : 87.21040466,87.21020344
file name : Image_15062022161936289.png
|
2022-06-15 16:19:36.394504 |
87 |
48656638 |
CONST OF PUCCA DRAIN FROM RUDAL PASWAN HOUSE TO PMGSY ROAD |
246300 |
CONST OF PUCCA DRAIN FROM RUDAL PASWAN HOUSE TO PMGSY ROAD1 |
Completion of work |
-

latitude : 23.73341164,23.73357386
Longitude : 87.21712475,87.21725983
file name : Image_25082022160520794.png
|
2022-08-25 16:05:20.908261 |
88 |
48656816 |
CONST OF NEW WELL AT MAJHIPARA |
287661 |
CONST OF NEW WELL AT MAJHIPARA1 |
Completion of work |
-

latitude : 23.71340287
Longitude : 87.21762689
file name : Image_29082022165429492.png
|
2022-08-29 16:54:29.617653 |
89 |
48637575 |
CONST OF WATER TANK AT SHYAMLA |
295488 |
CONST OF WATER TANK AT SHYAMLA1 |
Completion of work |
-

latitude : 23.74726659
Longitude : 87.20296743
file name : Image_08092022151419790.png
|
2022-09-08 15:14:19.922509 |
90 |
58105315 |
CONST OF PCC ROAD FROM BHAGABAN GARAI HOUSE TO SEDO PUKUR GHAT AT SAN III |
100000 |
CONST OF PCC ROAD FROM BHAGABAN GARAI HOUSE TO SEDO PUKUR GHAT AT SAN III1 |
Completion of work |
-

latitude : 23.73498894,23.73498954
Longitude : 87.18319781,87.18319955
file name : Image_19052023153450721.png
|
2023-05-19 15:34:50.787543 |
91 |
58105315 |
CONST OF PCC ROAD FROM BHAGABAN GARAI HOUSE TO SEDO PUKUR GHAT AT SAN III |
100000 |
CONST OF PCC ROAD FROM BHAGABAN GARAI HOUSE TO SEDO PUKUR GHAT AT SAN III1 |
Completion of work |
-

latitude : 23.73503677,23.73498939,23.73496944
Longitude : 87.18319988,87.1831988,87.18315932
file name : Image_19052023145955505.png
|
2023-05-19 14:59:55.568904 |
92 |
58119873 |
RENOVATION OF WELLS AT TAPANPUR COLONY |
50000 |
RENOVATION OF WELLS AT TAPANPUR COLONY1 |
Plinth level |
-

latitude : 23.71349846
Longitude : 87.21429127
file name : Image_08052023171410585.png
|
2023-05-08 17:14:10.649706 |
93 |
58106530 |
CONST OF PUCCA DRAIN FROM SHYAMLA FP SCHOOL TO NAPIT POND AT SHYAMLA VILLAGE |
350000 |
CONST OF PUCCA DRAIN FROM SHYAMLA FP SCHOOL TO NAPIT POND AT SHYAMLA VILLAGE1 |
Plinth level |
-

latitude : 23.74567729,23.74566558,23.74567046
Longitude : 87.20021527,87.20019962,87.20019648
file name : Image_12052023181611831.png
|
2023-05-12 18:16:11.89201 |
94 |
58106530 |
CONST OF PUCCA DRAIN FROM SHYAMLA FP SCHOOL TO NAPIT POND AT SHYAMLA VILLAGE |
350000 |
CONST OF PUCCA DRAIN FROM SHYAMLA FP SCHOOL TO NAPIT POND AT SHYAMLA VILLAGE1 |
Plinth level |
-

latitude : 23.7456881,23.7460356
Longitude : 87.20007517,87.199764
file name : Image_12052023181458170.png
|
2023-05-12 18:14:58.228219 |
95 |
58119578 |
CONST OF PCC ROAD FROM CHANDI KARMAKAR HOUSE TO SAHEB PAL HOUSE |
235500 |
CONST OF PCC ROAD FROM CHANDI KARMAKAR HOUSE TO SAHEB PAL HOUSE1 |
Plinth level |
-

latitude : 23.71359892,23.71360495
Longitude : 87.21314039,87.21320022
file name : Image_16052023154604071.png
|
2023-05-16 15:46:04.152434 |
96 |
48681718 |
CONST OF 2 NOS DUSTBIN AT 36GONDA SHIBTALA BAURIPARA |
90000 |
CONST OF 2 NOS DUSTBIN AT 36GONDA SHIBTALA BAURIPARA1 |
Plinth level |
-

latitude : 23.73281159
Longitude : 87.21667784
file name : Image_29052023173818343.png
|
2023-05-29 17:38:18.405552 |
97 |
48681718 |
CONST OF 2 NOS DUSTBIN AT 36GONDA SHIBTALA BAURIPARA |
90000 |
CONST OF 2 NOS DUSTBIN AT 36GONDA SHIBTALA BAURIPARA1 |
Plinth level |
-

latitude : 23.73281159
Longitude : 87.21667784
file name : Image_29052023173814447.png
|
2023-05-29 17:38:14.507502 |
98 |
58115318 |
CONST OF PUCCA DRAIN AT SAN VI |
98000 |
CONST OF PUCCA DRAIN AT SAN VI1 |
Roof laid |
-

latitude : 23.74095403,23.74091653,23.74088932
Longitude : 87.20694765,87.20699788,87.20708042
file name : Image_07062023174459111.png
|
2023-06-07 17:44:59.176013 |
99 |
58115318 |
CONST OF PUCCA DRAIN AT SAN VI |
98000 |
CONST OF PUCCA DRAIN AT SAN VI1 |
Plinth level |
-

latitude : 23.74098885,23.74099082,23.74093283
Longitude : 87.20698808,87.20702005,87.20708144
file name : Image_07062023174001532.png
|
2023-06-07 17:40:01.595273 |
100 |
48656527 |
CONST OF GROUND SHED NEAR SHYAMLA COLLIERY DURGAMANDIR FOOTBALL GROUND |
284641 |
CONST OF GROUND SHED NEAR SHYAMLA COLLIERY DURGAMANDIR FOOTBALL GROUND1 |
Completion of work |
-

latitude : 23.7394843
Longitude : 87.20971794
file name : Image_08122022152612206.png
|
2022-12-08 15:26:12.267151 |
101 |
58161893 |
MAINTAINANCE OF DRINKING WATER SYSTEM |
68495 |
MAINTAINANCE OF DRINKING WATER SYSTEM1 |
Roof laid |
-

latitude : 23.7206554
Longitude : 87.2125892
file name : Image_27062023145842884.png
|
2023-06-27 14:58:42.962744 |
102 |
58161893 |
MAINTAINANCE OF DRINKING WATER SYSTEM |
68495 |
MAINTAINANCE OF DRINKING WATER SYSTEM1 |
Plinth level |
-

latitude : 23.7206573
Longitude : 87.2125903
file name : Image_27062023145319641.png
|
2023-06-27 14:53:19.704501 |
103 |
58161893 |
MAINTAINANCE OF DRINKING WATER SYSTEM |
68495 |
MAINTAINANCE OF DRINKING WATER SYSTEM1 |
Plinth level |
-

latitude : 23.7206574
Longitude : 87.2125905
file name : Image_27062023145316434.png
|
2023-06-27 14:53:16.498721 |
104 |
58161893 |
MAINTAINANCE OF DRINKING WATER SYSTEM |
68495 |
MAINTAINANCE OF DRINKING WATER SYSTEM1 |
Roof laid |
-

latitude : 23.7206554
Longitude : 87.2125892
file name : Image_03072023123619253.png
|
2023-07-03 12:36:19.183404 |
105 |
34641365 |
REPAIRING OF TUBEWELL AROUND GP AREA |
200000 |
REPAIRING OF TUBEWELL AROUND GP AREA30 |
Completion of work |
-

latitude : 23.70095553
Longitude : 87.18539946
file name : Image_30062023171536641.png
|
2023-06-30 17:15:36.531626 |
106 |
58122110 |
TUBEWELL REPAIRING AT ALL SANSAD |
700000 |
TUBEWELL REPAIRING AT ALL SANSAD1 |
Completion of work |
-

latitude : 23.7197997
Longitude : 87.21466768
file name : Image_30062023171818841.png
|
2023-06-30 17:18:18.91362 |
107 |
58122110 |
TUBEWELL REPAIRING AT ALL SANSAD |
700000 |
TUBEWELL REPAIRING AT ALL SANSAD1 |
Plinth level |
-

latitude : 23.71981357
Longitude : 87.2145904
file name : Image_04122023153231161.png
|
2023-12-04 15:32:31.256018 |
108 |
58122110 |
TUBEWELL REPAIRING AT ALL SANSAD |
700000 |
TUBEWELL REPAIRING AT ALL SANSAD1 |
Roof laid |
-

latitude : 23.71981371
Longitude : 87.21462064
file name : Image_04122023153556030.png
|
2023-12-04 15:35:56.117586 |
109 |
48656548 |
CONST OF PCC ROAD FROM PARITOSH GHOSH HOUSE TO AJOY RIVER GHAT |
235000 |
CONST OF PCC ROAD FROM PARITOSH GHOSH HOUSE TO AJOY RIVER GHAT1 |
Completion of work |
-

latitude : 23.73840274,23.73837631
Longitude : 87.21971702,87.21968946
file name : Image_25082023125801513.png
|
2023-08-25 12:58:01.603494 |
110 |
67842960 |
Creation of drainage channel for management of grey water |
98000 |
GARBAGE CLEANING AT 36 GONDA MOUZA 2 TIMES IN THE YEAR. |
Completion of work |
-

latitude : 23.7188176
Longitude : 87.2113553
file name : Image_17102023172608627.png
|
2023-10-17 17:26:08.715004 |
111 |
67842960 |
Creation of drainage channel for management of grey water |
98000 |
GARBAGE CLEANING AT 36 GONDA MOUZA 2 TIMES IN THE YEAR. |
Plinth level |
-

latitude : 23.7202375
Longitude : 87.2127296
file name : Image_11112023125453721.png
|
2023-11-11 12:54:53.816243 |
112 |
67842960 |
Creation of drainage channel for management of grey water |
98000 |
GARBAGE CLEANING AT 36 GONDA MOUZA 2 TIMES IN THE YEAR. |
Roof laid |
-

latitude : 23.7202409
Longitude : 87.2127649
file name : Image_28022024132657290.png
|
2024-02-28 13:26:57.385538 |
113 |
67843022 |
Creation of drainage channel for management of grey water |
98000 |
GARBAGE CLEANING AT SHYAMLA MOUZA 2 TIMES IN THE YEAR. |
Completion of work |
-

latitude : 23.7205629
Longitude : 87.2127386
file name : Image_17102023172700048.png
|
2023-10-17 17:27:00.134621 |
114 |
67843022 |
Creation of drainage channel for management of grey water |
98000 |
GARBAGE CLEANING AT SHYAMLA MOUZA 2 TIMES IN THE YEAR. |
Plinth level |
-

latitude : 23.7202362
Longitude : 87.2127329
file name : Image_11112023125536133.png
|
2023-11-11 12:55:36.219034 |
115 |
67843022 |
Creation of drainage channel for management of grey water |
98000 |
GARBAGE CLEANING AT SHYAMLA MOUZA 2 TIMES IN THE YEAR. |
Roof laid |
-

latitude : 23.7202326
Longitude : 87.2127621
file name : Image_28022024132918678.png
|
2024-02-28 13:29:18.771697 |
116 |
67842812 |
Creation of drainage channel for management of grey water |
98000 |
GARBAGE CLEANING AT KHOTTADIHI MOUZA 2 TIMES IN THE YEAR. |
Completion of work |
-

latitude : 23.7188174
Longitude : 87.2113537
file name : Image_17102023172428109.png
|
2023-10-17 17:24:28.198861 |
117 |
67842812 |
Creation of drainage channel for management of grey water |
98000 |
GARBAGE CLEANING AT KHOTTADIHI MOUZA 2 TIMES IN THE YEAR. |
Plinth level |
-

latitude : 23.7202361
Longitude : 87.2127338
file name : Image_11112023125328446.png
|
2023-11-11 12:53:28.537446 |
118 |
67842812 |
Creation of drainage channel for management of grey water |
98000 |
GARBAGE CLEANING AT KHOTTADIHI MOUZA 2 TIMES IN THE YEAR. |
Roof laid |
-

latitude : 23.7202409
Longitude : 87.2127649
file name : Image_28022024132517281.png
|
2024-02-28 13:25:17.379455 |
119 |
67406730 |
Green Fencing and Plantation |
200000 |
FENCING WORK ARROUND BALI POND FOR HORTICULTURE PURPOSE |
Completion of work |
-

latitude : 23.74562258
Longitude : 87.20374773
file name : Image_08012024145946935.png
|
2024-01-08 14:59:47.044899 |
120 |
67406730 |
Green Fencing and Plantation |
200000 |
FENCING WORK ARROUND BALI POND FOR HORTICULTURE PURPOSE |
Completion of work |
-

latitude : 23.74562496
Longitude : 87.2037479
file name : Image_08012024145950547.png
|
2024-01-08 14:59:50.65788 |
121 |
67406730 |
Green Fencing and Plantation |
200000 |
FENCING WORK ARROUND BALI POND FOR HORTICULTURE PURPOSE |
Completion of work |
-

latitude : 23.74562496
Longitude : 87.2037479
file name : Image_08012024145954348.png
|
2024-01-08 14:59:54.449075 |
122 |
67406730 |
Green Fencing and Plantation |
200000 |
FENCING WORK ARROUND BALI POND FOR HORTICULTURE PURPOSE |
Plinth level |
-

latitude : 23.74562188
Longitude : 87.2037323
file name : Image_08012024150441461.png
|
2024-01-08 15:04:41.598216 |
123 |
67406730 |
Green Fencing and Plantation |
200000 |
FENCING WORK ARROUND BALI POND FOR HORTICULTURE PURPOSE |
Roof laid |
-

latitude : 23.74563269
Longitude : 87.20373115
file name : Image_08012024150743392.png
|
2024-01-08 15:07:43.460898 |
124 |
67471265 |
Procurement of Computer |
99000 |
Procurement of Computer1 |
|
-

latitude : 23.7202605
Longitude : 87.2127755
file name : Image_04012024135324070.png
|
2024-01-04 13:53:24.180488 |
125 |
67471265 |
Procurement of Computer |
99000 |
Procurement of Computer4 |
|
-

latitude : 23.7202605
Longitude : 87.2127755
file name : Image_04012024140456084.png
|
2024-01-04 14:04:56.199705 |
126 |
67471265 |
Procurement of Computer |
99000 |
Procurement of Computer5 |
|
-

latitude : 23.7202605
Longitude : 87.2127755
file name : Image_04012024135347676.png
|
2024-01-04 13:53:47.781561 |
127 |
67471265 |
Procurement of Computer |
99000 |
Procurement of Computer5 |
|
-

latitude : 23.7202605
Longitude : 87.2127755
file name : Image_04012024140459218.png
|
2024-01-04 14:04:59.339758 |
128 |
67471265 |
Procurement of Computer |
99000 |
Procurement of Computer6 |
|
-

latitude : 23.7202605
Longitude : 87.2127755
file name : Image_04012024135754025.png
|
2024-01-04 13:57:54.137687 |
129 |
67471265 |
Procurement of Computer |
99000 |
Procurement of Computer7 |
|
-

latitude : 23.7202605
Longitude : 87.2127755
file name : Image_04012024140504944.png
|
2024-01-04 14:05:04.483629 |
130 |
67471265 |
Procurement of Computer |
99000 |
Procurement of Computer8 |
|
-

latitude : 23.7202605
Longitude : 87.2127755
file name : Image_04012024140518411.png
|
2024-01-04 14:05:18.528456 |
131 |
67471265 |
Procurement of Computer |
99000 |
Procurement of Computer9 |
|
-

latitude : 23.7202605
Longitude : 87.2127755
file name : Image_04012024140521897.png
|
2024-01-04 14:05:22.000477 |
132 |
67471265 |
Procurement of Computer |
99000 |
Procurement of Computer10 |
|
-

latitude : 23.7202605
Longitude : 87.2127755
file name : Image_04012024140525739.png
|
2024-01-04 14:05:25.845336 |
133 |
67428719 |
Creation of a new source of drinking water |
70000 |
REPAIRING OF WATER RESERVOR AT METEL DHOWRA OF SHYAMLA COLLIERY |
Completion of work |
-

latitude : 23.74013844
Longitude : 87.21191978
file name : Image_16012024151719998.png
|
2024-01-16 15:17:20.051085 |
134 |
67428719 |
Creation of a new source of drinking water |
70000 |
REPAIRING OF WATER RESERVOR AT METEL DHOWRA OF SHYAMLA COLLIERY |
Plinth level |
-

latitude : 23.74013995
Longitude : 87.2119528
file name : Image_16012024152113112.png
|
2024-01-16 15:21:13.167309 |
135 |
67428719 |
Creation of a new source of drinking water |
70000 |
REPAIRING OF WATER RESERVOR AT METEL DHOWRA OF SHYAMLA COLLIERY |
Roof laid |
-

latitude : 23.74014608
Longitude : 87.21196405
file name : Image_16012024152304726.png
|
2024-01-16 15:23:04.783201 |
136 |
67378328 |
Creation of a new source of drinking water |
300000 |
INSTALLATION OF SOLAR SUB MURSIBLE PUMP AT FORFORI DAHAL |
Completion of work |
-

latitude : 23.74291947
Longitude : 87.18311611
file name : Image_16012024162716866.png
|
2024-01-16 16:27:16.924373 |
137 |
67378328 |
Creation of a new source of drinking water |
300000 |
INSTALLATION OF SOLAR SUB MURSIBLE PUMP AT FORFORI DAHAL |
Plinth level |
-

latitude : 23.7428708
Longitude : 87.18308701
file name : Image_16012024163019977.png
|
2024-01-16 16:30:20.053946 |
138 |
67378328 |
Creation of a new source of drinking water |
300000 |
INSTALLATION OF SOLAR SUB MURSIBLE PUMP AT FORFORI DAHAL |
Roof laid |
-

latitude : 23.74289174
Longitude : 87.18307969
file name : Image_16012024163850914.png
|
2024-01-16 16:38:50.981365 |
139 |
67378328 |
Creation of a new source of drinking water |
300000 |
INSTALLATION OF SOLAR SUB MURSIBLE PUMP AT FORFORI DAHAL |
Roof laid |
-

latitude : 23.74288543
Longitude : 87.18307584
file name : Image_16012024163847154.png
|
2024-01-16 16:38:47.221503 |
140 |
67378328 |
Creation of a new source of drinking water |
300000 |
INSTALLATION OF SOLAR SUB MURSIBLE PUMP AT FORFORI DAHAL |
Roof laid |
-

latitude : 23.74289174
Longitude : 87.18307969
file name : Image_16012024163854717.png
|
2024-01-16 16:38:54.828514 |
141 |
48656964 |
CONST OF WELL NEAR TUNI BIBI HOUSE |
329960 |
CONST OF WELL NEAR TUNI BIBI HOUSE1 |
Completion of work |
-

latitude : 23.72244541
Longitude : 87.20882838
file name : Image_26012023154231371.png
|
2023-01-26 15:42:31.438041 |
142 |
67429531 |
Creation of a new source of drinking water |
250000 |
INSTALLATION OF SUBMURSIBLE PUMP AT KHOTTADIHI ICDS CENTRE |
Completion of work |
-

latitude : 23.7146191
Longitude : 87.2108916
file name : Image_05022024131238225.png
|
2024-02-05 13:12:38.287278 |
143 |
67429531 |
Creation of a new source of drinking water |
250000 |
INSTALLATION OF SUBMURSIBLE PUMP AT KHOTTADIHI ICDS CENTRE |
Plinth level |
-

latitude : 23.71461621
Longitude : 87.2109092
file name : Image_05022024132159786.png
|
2024-02-05 13:21:59.839971 |
144 |
67429531 |
Creation of a new source of drinking water |
250000 |
INSTALLATION OF SUBMURSIBLE PUMP AT KHOTTADIHI ICDS CENTRE |
Roof laid |
-

latitude : 23.71459069
Longitude : 87.21091016
file name : Image_05022024132359487.png
|
2024-02-05 13:23:59.545014 |
145 |
34487382 |
PCC ROAD FROM MILAN GHOSH HOUSE TO UJJAL GHOSH |
138257 |
PCC ROAD FROM MILAN GHOSH HOUSE TO UJJAL GHOSH1 |
Completion of work |
-

latitude : 23.72024854,23.71531856
Longitude : 87.21269603,87.21434886
file name : Image_28022023183843799.png
|
2023-02-28 18:38:43.910883 |
146 |
34487382 |
PCC ROAD FROM MILAN GHOSH HOUSE TO UJJAL GHOSH |
138257 |
PCC ROAD FROM MILAN GHOSH HOUSE TO UJJAL GHOSH1 |
Plinth level |
-

latitude : 23.71360853,23.7136387
Longitude : 87.2146448,87.21463284
file name : Image_09082024134916870.png
|
2024-08-09 13:49:16.959309 |
147 |
34487382 |
PCC ROAD FROM MILAN GHOSH HOUSE TO UJJAL GHOSH |
138257 |
PCC ROAD FROM MILAN GHOSH HOUSE TO UJJAL GHOSH1 |
Roof laid |
-

latitude : 23.71368278,23.71364116
Longitude : 87.21442596,87.21441751
file name : Image_09082024135627081.png
|
2024-08-09 13:56:27.18719 |
148 |
67429166 |
Creation of a new source of drinking water |
150000 |
RENOVATION AT TILKA KUTIR AT 36GONDA |
Completion of work |
-

latitude : 23.731364
Longitude : 87.2146648
file name : Image_08022024160305929.png
|
2024-02-08 16:03:05.981916 |
149 |
67429166 |
Creation of a new source of drinking water |
150000 |
RENOVATION AT TILKA KUTIR AT 36GONDA |
Plinth level |
-

latitude : 23.731364
Longitude : 87.2146648
file name : Image_08022024160735046.png
|
2024-02-08 16:07:35.099738 |
150 |
67429166 |
Creation of a new source of drinking water |
150000 |
RENOVATION AT TILKA KUTIR AT 36GONDA |
Roof laid |
-

latitude : 23.73181688
Longitude : 87.21457155
file name : Image_08022024161719025.png
|
2024-02-08 16:17:19.081082 |
151 |
67367233 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-

latitude : 23.738045,23.7380454
Longitude : 87.2110772,87.2110805
file name : Image_07122023154701597.png
|
2023-12-07 15:47:01.664195 |
152 |
67367233 |
Construction of roads |
250000 |
Construction of roads1 |
Plinth level |
-

latitude : 23.73900815,23.73900718
Longitude : 87.21208194,87.21210334
file name : Image_07122023155345132.png
|
2023-12-07 15:53:45.196883 |
153 |
67367233 |
Construction of roads |
250000 |
Construction of roads1 |
Roof laid |
-

latitude : 23.73915581,23.73915578,23.73912327
Longitude : 87.21214484,87.21214481,87.21215307
file name : Image_07122023155705893.png
|
2023-12-07 15:57:05.953033 |
154 |
67369361 |
Construction of roads |
260000 |
CONSTRUCTION OF PCC ROAD FROM BHAIRAB GHOSH HOUSE TO PARIMAL MONDAL HOUSE AT ALINAGAR |
Completion of work |
-

latitude : 23.72136562,23.7213559,23.72133806
Longitude : 87.19995783,87.19992803,87.19990245
file name : Image_07122023163115219.png
|
2023-12-07 16:31:15.27816 |
155 |
67369361 |
Construction of roads |
260000 |
CONSTRUCTION OF PCC ROAD FROM BHAIRAB GHOSH HOUSE TO PARIMAL MONDAL HOUSE AT ALINAGAR |
Plinth level |
-

latitude : 23.72133003,23.72133496,23.72132387
Longitude : 87.19983948,87.19984226,87.19983864
file name : Image_07122023163847943.png
|
2023-12-07 16:38:47.996695 |
156 |
67369361 |
Construction of roads |
260000 |
CONSTRUCTION OF PCC ROAD FROM BHAIRAB GHOSH HOUSE TO PARIMAL MONDAL HOUSE AT ALINAGAR |
Roof laid |
-

latitude : 23.72136347,23.72135813
Longitude : 87.19986494,87.1998599
file name : Image_07122023164042467.png
|
2023-12-07 16:40:42.527722 |
157 |
67367550 |
Construction of roads |
201457 |
Construction of roads1 |
Completion of work |
-

latitude : 23.71553087,23.71550728,23.71546673
Longitude : 87.20978243,87.20977979,87.20978569
file name : Image_11122023154618601.png
|
2023-12-11 15:46:18.65729 |
158 |
67367550 |
Construction of roads |
201457 |
Construction of roads1 |
Plinth level |
-

latitude : 23.71542716,23.71539129
Longitude : 87.20977901,87.20977216
file name : Image_11122023155008379.png
|
2023-12-11 15:50:08.527259 |
159 |
67367550 |
Construction of roads |
201457 |
Construction of roads1 |
Roof laid |
-

latitude : 23.71540658,23.71538749
Longitude : 87.20979284,87.20980283
file name : Image_11122023155209881.png
|
2023-12-11 15:52:09.950111 |
160 |
67368851 |
Construction of roads |
149230 |
Construction of roads1 |
Completion of work |
-

latitude : 23.71460007,23.71459112
Longitude : 87.21719817,87.21720717
file name : Image_11122023153431024.png
|
2023-12-11 15:34:31.098593 |
161 |
67368851 |
Construction of roads |
149230 |
Construction of roads1 |
Completion of work |
-

latitude : 23.71462199,23.71459436
Longitude : 87.21722286,87.21721986
file name : Image_11122023153434694.png
|
2023-12-11 15:34:34.749256 |
162 |
67368851 |
Construction of roads |
149230 |
Construction of roads1 |
Completion of work |
-

latitude : 23.71462199,23.71459436
Longitude : 87.21722286,87.21721986
file name : Image_11122023153439134.png
|
2023-12-11 15:34:39.211813 |
163 |
67368851 |
Construction of roads |
149230 |
Construction of roads1 |
Plinth level |
-

latitude : 23.71456616,23.71458066
Longitude : 87.21719918,87.21720439
file name : Image_11122023153749065.png
|
2023-12-11 15:37:49.125535 |
164 |
67368851 |
Construction of roads |
149230 |
Construction of roads1 |
Roof laid |
-

latitude : 23.71459,23.71459867
Longitude : 87.21722522,87.21721411
file name : Image_11122023153939238.png
|
2023-12-11 15:39:39.311137 |
165 |
67431826 |
Creation of a new source of drinking water |
250000 |
INSTALLATION OF TUBEWELL NEAR BHURI HANUMAN MANDIR SANSAD III |
Completion of work |
-

latitude : 23.73260164
Longitude : 87.18191277
file name : Image_16022024140514233.png
|
2024-02-16 14:05:14.29847 |
166 |
67431826 |
Creation of a new source of drinking water |
250000 |
INSTALLATION OF TUBEWELL NEAR BHURI HANUMAN MANDIR SANSAD III |
Roof laid |
-

latitude : 23.73256368
Longitude : 87.18190523
file name : Image_16022024140909708.png
|
2024-02-16 14:09:09.776871 |
167 |
67431826 |
Creation of a new source of drinking water |
250000 |
INSTALLATION OF TUBEWELL NEAR BHURI HANUMAN MANDIR SANSAD III |
Plinth level |
-

latitude : 23.732574
Longitude : 87.18191216
file name : Image_16022024140729460.png
|
2024-02-16 14:07:29.520817 |
168 |
67378228 |
Procurement of Medicines |
30000 |
Procurement of Medicines1 |
|
-

latitude : 23.7011417
Longitude : 87.1857622
file name : Image_22022024122846227.png
|
2024-02-22 12:28:46.35547 |
169 |
67369285 |
Construction of roads |
199911 |
Construction of roads1 |
Completion of work |
-

latitude : 23.72198638,23.72198643
Longitude : 87.19920233,87.19919253
file name : Image_25042024174514928.png
|
2024-04-25 17:45:15.03374 |
170 |
67369285 |
Construction of roads |
199911 |
Construction of roads1 |
Plinth level |
-

latitude : 23.72211445,23.72211124,23.72210971
Longitude : 87.19915345,87.19916955,87.19919187
file name : Image_25042024175047750.png
|
2024-04-25 17:50:47.856331 |
171 |
67369285 |
Construction of roads |
199911 |
Construction of roads1 |
Roof laid |
-

latitude : 23.72209821,23.72209148
Longitude : 87.19918462,87.19918203
file name : Image_25042024175705813.png
|
2024-04-25 17:57:05.90383 |
172 |
67370931 |
Provision of Internet connection |
50000 |
Provision of Internet connection1 |
|
-

latitude : 23.7202387
Longitude : 87.2127637
file name : Image_15032024131539400.png
|
2024-03-15 13:15:39.490385 |
173 |
94226009 |
Construction of Community Sanitary Complex |
83946 |
Construction of Community Sanitary Complex at Nimsha SBM village under Shyamla GP |
Completion of work |
-

latitude : 23.72279377
Longitude : 87.21003098
file name : Image_07062024151909930.png
|
2024-06-07 15:19:10.034204 |
174 |
94226009 |
Construction of Community Sanitary Complex |
83946 |
Construction of Community Sanitary Complex at Nimsha SBM village under Shyamla GP |
Plinth level |
-

latitude : 23.72278624
Longitude : 87.21002164
file name : Image_07062024152245770.png
|
2024-06-07 15:22:45.8638 |
175 |
94226009 |
Construction of Community Sanitary Complex |
83946 |
Construction of Community Sanitary Complex at Nimsha SBM village under Shyamla GP |
Roof laid |
-

latitude : 23.72280636
Longitude : 87.21004325
file name : Image_07062024152530970.png
|
2024-06-07 15:25:31.070315 |
176 |
67471655 |
Drainage Construction |
143495 |
CONSTRUCTION OF PUCCA DRAIN AT SANSAD IV |
Completion of work |
-

latitude : 23.74619015
Longitude : 87.20346705
file name : Image_07062024164946035.png
|
2024-06-07 16:49:46.134426 |
177 |
67471655 |
Drainage Construction |
143495 |
CONSTRUCTION OF PUCCA DRAIN AT SANSAD IV |
Plinth level |
-

latitude : 23.7462037
Longitude : 87.20343998
file name : Image_07062024165415041.png
|
2024-06-07 16:54:15.162629 |
178 |
67471655 |
Drainage Construction |
143495 |
CONSTRUCTION OF PUCCA DRAIN AT SANSAD IV |
Roof laid |
-

latitude : 23.74622763
Longitude : 87.2034559
file name : Image_07062024165607707.png
|
2024-06-07 16:56:07.808279 |
179 |
94228923 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex at Chhatrishgonda SBM village under Shyamla GP |
Completion of work |
-

latitude : 23.73380233
Longitude : 87.21776845
file name : Image_19062024140013263.png
|
2024-06-19 14:00:13.350947 |
180 |
94228923 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex at Chhatrishgonda SBM village under Shyamla GP |
Plinth level |
-

latitude : 23.73380411
Longitude : 87.21774568
file name : Image_19062024140513940.png
|
2024-06-19 14:05:14.026334 |
181 |
94228923 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex at Chhatrishgonda SBM village under Shyamla GP |
Roof laid |
-

latitude : 23.73380924
Longitude : 87.21776452
file name : Image_19062024140728893.png
|
2024-06-19 14:07:28.98058 |
182 |
67429817 |
Creation of a new source of drinking water |
49697 |
REPAIRING OF TUBEWELL OTHER WATER SYSTEM AT BHURI MOUZA |
Completion of work |
-

latitude : 23.7187974
Longitude : 87.2115341
file name : Image_20062024132721766.png
|
2024-06-20 13:27:21.657606 |
183 |
67429817 |
Creation of a new source of drinking water |
49697 |
REPAIRING OF TUBEWELL OTHER WATER SYSTEM AT BHURI MOUZA |
Plinth level |
-

latitude : 23.71857032
Longitude : 87.21139367
file name : Image_20062024133024402.png
|
2024-06-20 13:30:24.502436 |
184 |
67429817 |
Creation of a new source of drinking water |
49697 |
REPAIRING OF TUBEWELL OTHER WATER SYSTEM AT BHURI MOUZA |
Roof laid |
-

latitude : 23.71881
Longitude : 87.2116126
file name : Image_20062024133148421.png
|
2024-06-20 13:31:48.515962 |
185 |
67430046 |
Creation of a new source of drinking water |
47964 |
REPAIRING OF TUBEWELL OTHER WATER SYSTEM AT 36GONDA MOUZA |
Completion of work |
-

latitude : 23.71861486
Longitude : 87.21300159
file name : Image_20062024131502558.png
|
2024-06-20 13:15:02.674393 |
186 |
67430046 |
Creation of a new source of drinking water |
47964 |
REPAIRING OF TUBEWELL OTHER WATER SYSTEM AT 36GONDA MOUZA |
Plinth level |
-

latitude : 23.7185311
Longitude : 87.2133057
file name : Image_20062024132038588.png
|
2024-06-20 13:20:38.684916 |
187 |
67430046 |
Creation of a new source of drinking water |
47964 |
REPAIRING OF TUBEWELL OTHER WATER SYSTEM AT 36GONDA MOUZA |
Roof laid |
-

latitude : 23.7185314
Longitude : 87.213308
file name : Image_20062024132210437.png
|
2024-06-20 13:22:10.52892 |
188 |
67430224 |
Creation of a new source of drinking water |
50000 |
REPAIRING OF TUBEWELL OTHER WATER SYSTEM AT NIMSHA MOUZA |
Roof laid |
-

latitude : 23.7204194
Longitude : 87.2085129
file name : Image_24062024163706191.png
|
2024-06-24 16:37:06.295305 |
189 |
67430224 |
Creation of a new source of drinking water |
50000 |
REPAIRING OF TUBEWELL OTHER WATER SYSTEM AT NIMSHA MOUZA |
Completion of work |
-

latitude : 23.72037267
Longitude : 87.20839745
file name : Image_24062024163318484.png
|
2024-06-24 16:33:18.430768 |
190 |
67430224 |
Creation of a new source of drinking water |
50000 |
REPAIRING OF TUBEWELL OTHER WATER SYSTEM AT NIMSHA MOUZA |
Plinth level |
-

latitude : 23.7204192
Longitude : 87.208512
file name : Image_24062024163526029.png
|
2024-06-24 16:35:26.130476 |
191 |
67471110 |
Creation of a new source of drinking water |
50000 |
REPAIRING OF TUBEWELL OTHER WATER SYSTEM AT KHOTTADIHI MOUZA |
Completion of work |
-

latitude : 23.7203619
Longitude : 87.21387039
file name : Image_24062024154541269.png
|
2024-06-24 15:45:41.380952 |
192 |
67471110 |
Creation of a new source of drinking water |
50000 |
REPAIRING OF TUBEWELL OTHER WATER SYSTEM AT KHOTTADIHI MOUZA |
Plinth level |
-

latitude : 23.72031647
Longitude : 87.21389189
file name : Image_24062024155544710.png
|
2024-06-24 15:55:44.820618 |
193 |
67471110 |
Creation of a new source of drinking water |
50000 |
REPAIRING OF TUBEWELL OTHER WATER SYSTEM AT KHOTTADIHI MOUZA |
Roof laid |
-

latitude : 23.72031335
Longitude : 87.21391168
file name : Image_24062024155817189.png
|
2024-06-24 15:58:17.287122 |
194 |
67429633 |
Creation of a new source of drinking water |
49800 |
MAINTENANCE OF WATER SYSTEM AT NIMSHA SAN XII |
Completion of work |
-

latitude : 23.65304519
Longitude : 87.12580711
file name : Image_20092024155452662.png
|
2024-09-20 15:54:52.75188 |
195 |
67429633 |
Creation of a new source of drinking water |
49800 |
MAINTENANCE OF WATER SYSTEM AT NIMSHA SAN XII |
Roof laid |
-

latitude : 23.71802814
Longitude : 87.21012232
file name : Image_20092024155953332.png
|
2024-09-20 15:59:53.430987 |
196 |
67429633 |
Creation of a new source of drinking water |
49800 |
MAINTENANCE OF WATER SYSTEM AT NIMSHA SAN XII |
Plinth level |
-

latitude : 23.71804359
Longitude : 87.21012791
file name : Image_20092024155853785.png
|
2024-09-20 15:58:53.87544 |
197 |
67435840 |
Drainage Construction |
348808 |
CONSTRUCTION OF PUCCA DRAIN FROM SARAIKA POND TO PWD ROAD |
Completion of work |
-

latitude : 23.72360871
Longitude : 87.21022105
file name : Image_03072024143923087.png
|
2024-07-03 14:39:23.273274 |
198 |
67435840 |
Drainage Construction |
348808 |
CONSTRUCTION OF PUCCA DRAIN FROM SARAIKA POND TO PWD ROAD |
Plinth level |
-

latitude : 23.72366862
Longitude : 87.21019749
file name : Image_03072024144200410.png
|
2024-07-03 14:42:00.511066 |
199 |
67435840 |
Drainage Construction |
348808 |
CONSTRUCTION OF PUCCA DRAIN FROM SARAIKA POND TO PWD ROAD |
Roof laid |
-

latitude : 23.7236523
Longitude : 87.21020343
file name : Image_03072024144328611.png
|
2024-07-03 14:43:28.721472 |
200 |
58109075 |
CONST OF PCC ROAD FORM MOLDHOWRA MANASA MANDIR TO SANJOY BAURI HOUSE AT SAN VI |
185500 |
CONST OF PCC ROAD FORM MOLDHOWRA MANASA MANDIR TO SANJOY BAURI HOUSE AT SAN VI1 |
Completion of work |
-

latitude : 23.73882391,23.73881603
Longitude : 87.21103712,87.21103269
file name : Image_09082023183105420.png
|
2023-08-09 18:31:05.488892 |
201 |
48656614 |
CONST OF PCC ROAD FROM DASPARA CULVERT TO BIJAY MAJHI HOUSE |
235000 |
CONST OF PCC ROAD FROM DASPARA CULVERT TO BIJAY MAJHI HOUSE1 |
Completion of work |
-

latitude : 23.73181659,23.7316853,23.73168768
Longitude : 87.21570293,87.21594937,87.2159478
file name : Image_03082023164537927.png
|
2023-08-03 16:45:37.980926 |
202 |
58109409 |
CONST OF PCC ROAD FROM SAMIM MIA HOUSE TO GANESH GOPE HOUSE AT SAN VI |
150000 |
CONST OF PCC ROAD FROM SAMIM MIA HOUSE TO GANESH GOPE HOUSE AT SAN VI1 |
Completion of work |
-

latitude : 23.7385639,23.73856441
Longitude : 87.21092124,87.21091977
file name : Image_09082023174236107.png
|
2023-08-09 17:42:36.1824 |
203 |
67407146 |
Creation of a new source of drinking water |
299220 |
INSTALLATION OF SOLAR SUB MURSIBLE PUMP AT BHURI MUSLIMPARA |
Roof laid |
-

latitude : 23.73874769
Longitude : 87.17815832
file name : Image_20092024172852390.png
|
2024-09-20 17:28:52.49796 |
204 |
67407146 |
Creation of a new source of drinking water |
299220 |
INSTALLATION OF SOLAR SUB MURSIBLE PUMP AT BHURI MUSLIMPARA |
Completion of work |
-

latitude : 23.73874276
Longitude : 87.17816351
file name : Image_20092024172340813.png
|
2024-09-20 17:23:40.912264 |
205 |
67407146 |
Creation of a new source of drinking water |
299220 |
INSTALLATION OF SOLAR SUB MURSIBLE PUMP AT BHURI MUSLIMPARA |
Plinth level |
-

latitude : 23.73874446
Longitude : 87.17814937
file name : Image_20092024172647960.png
|
2024-09-20 17:26:48.061338 |
206 |
67428888 |
Creation of a new source of drinking water |
249750 |
INSTALLATION OF SOLAR SUB MURSIBLE PUMP WITH WATER CONNECTION AT SANSAD VII |
Completion of work |
-

latitude : 23.72041484
Longitude : 87.2143543
file name : Image_08072024151646981.png
|
2024-07-08 15:16:47.089066 |
207 |
67428888 |
Creation of a new source of drinking water |
249750 |
INSTALLATION OF SOLAR SUB MURSIBLE PUMP WITH WATER CONNECTION AT SANSAD VII |
Plinth level |
-

latitude : 23.72041036
Longitude : 87.21430698
file name : Image_08072024152042117.png
|
2024-07-08 15:20:42.209644 |
208 |
67428888 |
Creation of a new source of drinking water |
249750 |
INSTALLATION OF SOLAR SUB MURSIBLE PUMP WITH WATER CONNECTION AT SANSAD VII |
Roof laid |
-

latitude : 23.72040206
Longitude : 87.21441058
file name : Image_08072024152639675.png
|
2024-07-08 15:26:39.767796 |
209 |
58117367 |
RENOVATION OF WELL NEAR LALMOHAN RUIDAS HOUSE |
50000 |
RENOVATION OF WELL NEAR LALMOHAN RUIDAS HOUSE1 |
Plinth level |
-

latitude : 23.71490102
Longitude : 87.21070014
file name : Image_08052023165816241.png
|
2023-05-08 16:58:16.315308 |
210 |
58117913 |
CONST OF WATER TANK AT DIHIPARA CHANDIMANDIR |
150002 |
CONST OF WATER TANK AT DIHIPARA CHANDIMANDIR1 |
Plinth level |
-

latitude : 23.71458488
Longitude : 87.21115952
file name : Image_31052023170530525.png
|
2023-05-31 17:05:30.596355 |
211 |
58120364 |
CONST OF WATER TANK AT KHOTTADIHI SSK |
150002 |
CONST OF WATER TANK AT KHOTTADIHI SSK1 |
Plinth level |
-

latitude : 23.71395401
Longitude : 87.21425158
file name : Image_31052023165826457.png
|
2023-05-31 16:58:26.538468 |
212 |
94235454 |
Creation of a new source of drinking water |
74500 |
Maintenance and repairing of Drinking water systems at Alinagar Village |
Completion of work |
-

latitude : 23.72391255
Longitude : 87.19877738
file name : Image_25112024153930216.png
|
2024-11-25 15:39:30.333165 |
213 |
94235454 |
Creation of a new source of drinking water |
74500 |
Maintenance and repairing of Drinking water systems at Alinagar Village |
Plinth level |
-

latitude : 23.72387641
Longitude : 87.19870294
file name : Image_25112024154159598.png
|
2024-11-25 15:41:59.686468 |
214 |
94235454 |
Creation of a new source of drinking water |
74500 |
Maintenance and repairing of Drinking water systems at Alinagar Village |
Roof laid |
-

latitude : 23.72386119
Longitude : 87.19867644
file name : Image_25112024154327035.png
|
2024-11-25 15:43:27.120368 |
215 |
94234652 |
Creation of a new source of drinking water |
75000 |
Maintenance and repairing of Drinking water systems at Khottadihi Village |
Completion of work |
-

latitude : 23.71583584
Longitude : 87.21726397
file name : Image_22072024125342043.png
|
2024-07-22 12:53:42.131982 |
216 |
94234652 |
Creation of a new source of drinking water |
75000 |
Maintenance and repairing of Drinking water systems at Khottadihi Village |
Plinth level |
-

latitude : 23.71581509
Longitude : 87.21727399
file name : Image_22072024125740799.png
|
2024-07-22 12:57:40.878736 |
217 |
94234652 |
Creation of a new source of drinking water |
75000 |
Maintenance and repairing of Drinking water systems at Khottadihi Village |
Roof laid |
-

latitude : 23.71588903
Longitude : 87.2172558
file name : Image_22072024130025063.png
|
2024-07-22 13:00:25.148268 |
218 |
48656978 |
CONST OF PCC ROAD LAXMI MANDIR TO SARASWATI MANDIR |
199582 |
CONST OF PCC ROAD LAXMI MANDIR TO SARASWATI MANDIR1 |
Completion of work |
-

latitude : 23.71981964,23.71982739
Longitude : 87.20224941,87.20222308
file name : Image_05122022142608042.png
|
2022-12-05 14:26:08.167088 |
219 |
48656730 |
CONST OF 4 PICS SOAKPIT AT SAD -IX |
90000 |
CONST OF 4 PICS SOAKPIT AT SAD -IX1 |
Roof laid |
-

latitude : 23.713698333333333
Longitude : 87.21737166666665
file name : Image_28032023182038201.png
|
2023-03-28 18:20:38.301685 |
220 |
48656730 |
CONST OF 4 PICS SOAKPIT AT SAD -IX |
90000 |
CONST OF 4 PICS SOAKPIT AT SAD -IX1 |
Roof laid |
-

latitude : 23.71447445
Longitude : 87.21622041
file name : Image_30032023165548838.png
|
2023-03-30 16:55:48.898426 |
221 |
48656730 |
CONST OF 4 PICS SOAKPIT AT SAD -IX |
90000 |
CONST OF 4 PICS SOAKPIT AT SAD -IX2 |
Roof laid |
-

latitude : 23.713748333333335
Longitude : 87.21735333333332
file name : Image_28032023182041604.png
|
2023-03-28 18:20:41.710267 |
222 |
48656730 |
CONST OF 4 PICS SOAKPIT AT SAD -IX |
90000 |
CONST OF 4 PICS SOAKPIT AT SAD -IX2 |
Roof laid |
-

latitude : 23.71373137
Longitude : 87.21733313
file name : Image_30032023170122125.png
|
2023-03-30 17:01:22.185355 |
223 |
48656730 |
CONST OF 4 PICS SOAKPIT AT SAD -IX |
90000 |
CONST OF 4 PICS SOAKPIT AT SAD -IX3 |
Roof laid |
-

latitude : 23.71455166666666
Longitude : 87.21612833333332
file name : Image_28032023182044939.png
|
2023-03-28 18:20:45.057493 |
224 |
48656730 |
CONST OF 4 PICS SOAKPIT AT SAD -IX |
90000 |
CONST OF 4 PICS SOAKPIT AT SAD -IX3 |
Roof laid |
-

latitude : 23.71452963
Longitude : 87.21619136
file name : Image_30032023170215922.png
|
2023-03-30 17:02:15.974149 |
225 |
48656730 |
CONST OF 4 PICS SOAKPIT AT SAD -IX |
90000 |
CONST OF 4 PICS SOAKPIT AT SAD -IX4 |
Roof laid |
-

latitude : 23.714521666666663
Longitude : 87.21615166666668
file name : Image_28032023182048155.png
|
2023-03-28 18:20:48.259607 |
226 |
48656730 |
CONST OF 4 PICS SOAKPIT AT SAD -IX |
90000 |
CONST OF 4 PICS SOAKPIT AT SAD -IX4 |
Roof laid |
-

latitude : 23.71454321
Longitude : 87.21613272
file name : Image_30032023170311766.png
|
2023-03-30 17:03:11.821384 |
227 |
48656989 |
CONST OF PCC ROAD FROM CHHABILAL GHOSH HOUSE SHAMSAN GHAT |
165000 |
CONST OF PCC ROAD FROM CHHABILAL GHOSH HOUSE SHAMSAN GHAT1 |
Roof laid |
-

latitude : 23.72197704,23.72201765
Longitude : 87.20376681,87.20378898
file name : Image_10032023123739646.png
|
2023-03-10 12:37:39.700578 |
228 |
48657020 |
CONSTRUCTION OF DRAIN FROM SIDE OF KABARSTHAN TO SAMUUDDIN HOUSE |
300000 |
CONSTRUCTION OF DRAIN FROM SIDE OF KABARSTHAN TO SAMUUDDIN HOUSE1 |
Plinth level |
-

latitude : 23.737585,23.73757833333333
Longitude : 87.17837,87.17836833333334
file name : Image_06032023182841685.png
|
2023-03-06 18:28:41.838326 |
229 |
48657020 |
CONSTRUCTION OF DRAIN FROM SIDE OF KABARSTHAN TO SAMUUDDIN HOUSE |
300000 |
CONSTRUCTION OF DRAIN FROM SIDE OF KABARSTHAN TO SAMUUDDIN HOUSE1 |
Plinth level |
-

latitude : 23.73758,23.73762333333333
Longitude : 87.17840166666669,87.1784
file name : Image_06032023182838396.png
|
2023-03-06 18:28:38.547076 |
230 |
48635077 |
CONST OF PUCCA DRAIN FROM PMGSY ROAD TO PINTU BAURI HOUSE VIA F.P SCHOOL |
250000 |
CONST OF PUCCA DRAIN FROM PMGSY ROAD TO PINTU BAURI HOUSE VIA F.P SCHOOL1 |
Plinth level |
-

latitude : 23.738916666666668,23.738913333333336
Longitude : 87.18732666666668,87.18730666666667
file name : Image_06032023184330190.png
|
2023-03-06 18:43:30.382262 |
231 |
48635077 |
CONST OF PUCCA DRAIN FROM PMGSY ROAD TO PINTU BAURI HOUSE VIA F.P SCHOOL |
250000 |
CONST OF PUCCA DRAIN FROM PMGSY ROAD TO PINTU BAURI HOUSE VIA F.P SCHOOL1 |
Plinth level |
-

latitude : 23.738955,23.73893333333333
Longitude : 87.18730333333333,87.18727666666668
file name : Image_06032023184422509.png
|
2023-03-06 18:44:22.689134 |
232 |
58102767 |
INSTALLATION OF SOLAR SUB-MURSIBLE PUMP WATER RESERVOIR NEAR ADIBASIPARA ICDS CENTER AT FORFORI |
350000 |
INSTALLATION OF SOLAR SUB-MURSIBLE PUMP WATER RESERVOIR NEAR ADIBASIPARA ICDS CENTER AT FORFORI1 |
Completion of work |
-

latitude : 23.73937714
Longitude : 87.1889311
file name : Image_14032023172045956.png
|
2023-03-14 17:20:46.017023 |
233 |
58158659 |
CONST OF PCC ROAD FROM BATUL GHOSH HOUSE TO MANASA GHOSH HOUSE AT SAN XIV |
97494 |
CONST OF PCC ROAD FROM BATUL GHOSH HOUSE TO MANASA GHOSH HOUSE AT SAN XIV1 |
Completion of work |
-

latitude : 23.72230748,23.7223285
Longitude : 87.20284443,87.20283779
file name : Image_24022023183655709.png
|
2023-02-24 18:36:55.790501 |
234 |
58106863 |
CONST OF PCC ROAD FROM BARU BADYAKAR HOUSE TO PCC ROAD |
97503 |
CONST OF PCC ROAD FROM BARU BADYAKAR HOUSE TO PCC ROAD1 |
Completion of work |
-

latitude : 23.74773003,23.74776377
Longitude : 87.19811621,87.19809383
file name : Image_24022023181141976.png
|
2023-02-24 18:11:42.033874 |
235 |
58116230 |
CONST OF PUCCA DRAIN FROM RABINDRA PASWAN HOUSE TO DASPARA NEW POND AT SAN VIII |
300000 |
CONST OF PUCCA DRAIN FROM RABINDRA PASWAN HOUSE TO DASPARA NEW POND AT SAN VIII1 |
Roof laid |
-

latitude : 23.73291372,23.73285705
Longitude : 87.21670321,87.21669783
file name : Image_09032023172418549.png
|
2023-03-09 17:24:18.608452 |
236 |
58107708 |
CONST OF PCC ROAD FROM OFFICE DHOWRA ICDS CENTER TO SHIBSHANKAR SINGH AT SAN - V |
150000 |
CONST OF PCC ROAD FROM OFFICE DHOWRA ICDS CENTER TO SHIBSHANKAR SINGH AT SAN - V1 |
Plinth level |
-

latitude : 23.740805,23.740805
Longitude : 87.2097211,87.2097211
file name : Image_14032023170751456.png
|
2023-03-14 17:07:51.514043 |
237 |
58104916 |
CONST OF PCC DRAIN FROM FARIDA KAZI HOUSE TO LAL SEKH HOUSH AT SAN II |
350000 |
CONST OF PCC DRAIN FROM FARIDA KAZI HOUSE TO LAL SEKH HOUSH AT SAN II1 |
Plinth level |
-

latitude : 23.73789079,23.73791987
Longitude : 87.17831699,87.17831844
file name : Image_27032023172551143.png
|
2023-03-27 17:25:51.201517 |
238 |
48681718 |
CONST OF 2 NOS DUSTBIN AT 36GONDA SHIBTALA BAURIPARA |
90000 |
CONST OF 2 NOS DUSTBIN AT 36GONDA SHIBTALA BAURIPARA2 |
Plinth level |
-

latitude : 23.73858923
Longitude : 87.22460111
file name : Image_29052023173811362.png
|
2023-05-29 17:38:11.451929 |
239 |
48657111 |
LADIES CHANGING ROOM AT DOLAGHAT |
98000 |
LADIES CHANGING ROOM AT DOLAGHAT1 |
Plinth level |
-

latitude : 23.73499285
Longitude : 87.18319305
file name : Image_29052023181415977.png
|
2023-05-29 18:14:16.051553 |
240 |
48657163 |
LADIES CHANGING ROOM AT MONDAL POND |
98000 |
LADIES CHANGING ROOM AT MONDAL POND1 |
Plinth level |
-

latitude : 23.73310271
Longitude : 87.18220312
file name : Image_29052023181856481.png
|
2023-05-29 18:18:56.54218 |
241 |
58105742 |
CONST OF PCC DRAIN FROM TAPAN GORAI HOUSE TO NAKUL BANDH CULVERT |
50000 |
CONST OF PCC DRAIN FROM TAPAN GORAI HOUSE TO NAKUL BANDH CULVERT1 |
Plinth level |
-

latitude : 23.73368525,23.73368467,23.73367605,23.73368407
Longitude : 87.18189454,87.18190532,87.18188921,87.18189672
file name : Image_31052023175915625.png
|
2023-05-31 17:59:15.696444 |
242 |
58117112 |
CONST OF CHANGING ROOM AT LALSA POND |
98000 |
CONST OF CHANGING ROOM AT LALSA POND1 |
Roof laid |
-

latitude : 23.7153815
Longitude : 87.2131174
file name : Image_28062023154454066.png
|
2023-06-28 15:44:53.842432 |
243 |
58117112 |
CONST OF CHANGING ROOM AT LALSA POND |
98000 |
CONST OF CHANGING ROOM AT LALSA POND1 |
Roof laid |
-

latitude : 23.7153809
Longitude : 87.2131209
file name : Image_28062023154535126.png
|
2023-06-28 15:45:35.197528 |
244 |
58117112 |
CONST OF CHANGING ROOM AT LALSA POND |
98000 |
CONST OF CHANGING ROOM AT LALSA POND1 |
Roof laid |
-

latitude : 23.72019864
Longitude : 87.21306081
file name : Image_28062023154457205.png
|
2023-06-28 15:44:57.296453 |
245 |
58115936 |
CONST PUCCA WELL AT 36GONDA KAZI PARA SAN VII |
350000 |
CONST PUCCA WELL AT 36GONDA KAZI PARA SAN VII1 |
Completion of work |
-

latitude : 23.7372003
Longitude : 87.2201955
file name : Image_20072023125441311.png
|
2023-07-20 12:54:41.543139 |
246 |
58108089 |
CONST OF PUCCA DRAIN AT SAN V |
150000 |
CONST OF PUCCA DRAIN AT SAN V1 |
Completion of work |
-

latitude : 23.74083157,23.74086288
Longitude : 87.20392972,87.20394806
file name : Image_02082023161505234.png
|
2023-08-02 16:15:05.302427 |
247 |
58159348 |
CONST OF PUCCA DRAIN FROM BHAGYADHAR GHOSH HOUSE TO LO POND WITH SOAKPIT AT SAN XIV |
150000 |
CONST OF PUCCA DRAIN FROM BHAGYADHAR GHOSH HOUSE TO LO POND WITH SOAKPIT AT SAN XIV1 |
Completion of work |
-

latitude : 23.72106313,23.72106322
Longitude : 87.19870989,87.19870988
file name : Image_10082023174047988.png
|
2023-08-10 17:40:48.04159 |
248 |
58159348 |
CONST OF PUCCA DRAIN FROM BHAGYADHAR GHOSH HOUSE TO LO POND WITH SOAKPIT AT SAN XIV |
150000 |
CONST OF PUCCA DRAIN FROM BHAGYADHAR GHOSH HOUSE TO LO POND WITH SOAKPIT AT SAN XIV1 |
Completion of work |
-

latitude : 23.72105836,23.72105914
Longitude : 87.19869895,87.19869614
file name : Image_10082023174041475.png
|
2023-08-10 17:40:41.537078 |
249 |
48656492 |
CONS OF PCC ROAD FROM PIYAR ALI KHAN HOUSE TO SSK AT SHYAMLA COLLIERY |
149571 |
CONS OF PCC ROAD FROM PIYAR ALI KHAN HOUSE TO SSK AT SHYAMLA COLLIERY1 |
Completion of work |
-

latitude : 23.73996449,23.74027589
Longitude : 87.20485209,87.20479817
file name : Image_14072022163307793.png
|
2022-07-14 16:33:07.903378 |
250 |
94227801 |
Construction of Community Sanitary Complex |
102146 |
Construction of Community Sanitary Complex at Bhuri SBM village Forfori under Shyamla GP |
Completion of work |
-

latitude : 23.73907538
Longitude : 87.18717368
file name : Image_22072024142802270.png
|
2024-07-22 14:28:02.361725 |
251 |
94227801 |
Construction of Community Sanitary Complex |
102146 |
Construction of Community Sanitary Complex at Bhuri SBM village Forfori under Shyamla GP |
Plinth level |
-

latitude : 23.73897508
Longitude : 87.18729607
file name : Image_22072024143016610.png
|
2024-07-22 14:30:16.698388 |
252 |
94227801 |
Construction of Community Sanitary Complex |
102146 |
Construction of Community Sanitary Complex at Bhuri SBM village Forfori under Shyamla GP |
Roof laid |
-

latitude : 23.73892677
Longitude : 87.18727419
file name : Image_22072024143154076.png
|
2024-07-22 14:31:54.165254 |
253 |
67827389 |
Repair of drainage channel |
98000 |
REPAIRING OF TUBEWELL PLATFORMS AT 36GONDA SANSAD VII |
Completion of work |
-

latitude : 23.72027271
Longitude : 87.2128026
file name : Image_15122023162722655.png
|
2023-12-15 16:27:22.737821 |
254 |
67827389 |
Repair of drainage channel |
98000 |
REPAIRING OF TUBEWELL PLATFORMS AT 36GONDA SANSAD VII |
Plinth level |
-

latitude : 23.7313067
Longitude : 87.2146523
file name : Image_15122023163045866.png
|
2023-12-15 16:30:45.950282 |
255 |
67827389 |
Repair of drainage channel |
98000 |
REPAIRING OF TUBEWELL PLATFORMS AT 36GONDA SANSAD VII |
Roof laid |
-

latitude : 23.7313072
Longitude : 87.2146522
file name : Image_15122023163421585.png
|
2023-12-15 16:34:21.661948 |
256 |
67842880 |
Creation of drainage channel for management of grey water |
98000 |
GARBAGE CLEANING AT NIMSHA MOUZA 2 TIMES IN THE YEAR. |
Completion of work |
-

latitude : 23.7188174
Longitude : 87.2113513
file name : Image_17102023172519746.png
|
2023-10-17 17:25:19.838639 |
257 |
67842880 |
Creation of drainage channel for management of grey water |
98000 |
GARBAGE CLEANING AT NIMSHA MOUZA 2 TIMES IN THE YEAR. |
Plinth level |
-

latitude : 23.7202371
Longitude : 87.2127372
file name : Image_11112023125416121.png
|
2023-11-11 12:54:16.269232 |
258 |
67842880 |
Creation of drainage channel for management of grey water |
98000 |
GARBAGE CLEANING AT NIMSHA MOUZA 2 TIMES IN THE YEAR. |
Roof laid |
-

latitude : 23.7202409
Longitude : 87.2127649
file name : Image_28022024132610456.png
|
2024-02-28 13:26:10.550095 |
259 |
67843086 |
Creation of drainage channel for management of grey water |
98000 |
GARBAGE CLEANING AT BHURI MOUZA 2 TIMES IN THE YEAR. |
Completion of work |
-

latitude : 23.7188177
Longitude : 87.2113504
file name : Image_17102023172804873.png
|
2023-10-17 17:28:04.964467 |
260 |
67843086 |
Creation of drainage channel for management of grey water |
98000 |
GARBAGE CLEANING AT BHURI MOUZA 2 TIMES IN THE YEAR. |
Plinth level |
-

latitude : 23.7202388
Longitude : 87.2127375
file name : Image_11112023125613218.png
|
2023-11-11 12:56:13.311658 |
261 |
67843086 |
Creation of drainage channel for management of grey water |
98000 |
GARBAGE CLEANING AT BHURI MOUZA 2 TIMES IN THE YEAR. |
Roof laid |
-

latitude : 23.7202326
Longitude : 87.2127621
file name : Image_28022024133049907.png
|
2024-02-28 13:30:50.007957 |
262 |
58161648 |
CONST OF PCC ROAD FROM EKKA BAURI HOUSE TO SEKH NASHIB HOUSE |
135500 |
CONST OF PCC ROAD FROM EKKA BAURI HOUSE TO SEKH NASHIB HOUSE1 |
Plinth level |
-

latitude : 23.71552518,23.71551615
Longitude : 87.21020871,87.21007219
file name : Image_12052023171253956.png
|
2023-05-12 17:12:54.020492 |
263 |
58161648 |
CONST OF PCC ROAD FROM EKKA BAURI HOUSE TO SEKH NASHIB HOUSE |
135500 |
CONST OF PCC ROAD FROM EKKA BAURI HOUSE TO SEKH NASHIB HOUSE1 |
Plinth level |
-

latitude : 23.71550725,23.7155242
Longitude : 87.21027457,87.21005182
file name : Image_12052023170722890.png
|
2023-05-12 17:07:22.955341 |
264 |
58161648 |
CONST OF PCC ROAD FROM EKKA BAURI HOUSE TO SEKH NASHIB HOUSE |
135500 |
CONST OF PCC ROAD FROM EKKA BAURI HOUSE TO SEKH NASHIB HOUSE1 |
Plinth level |
-

latitude : 23.71550725,23.7155242
Longitude : 87.21027457,87.21005182
file name : Image_12052023170726210.png
|
2023-05-12 17:07:26.274888 |
265 |
58161648 |
CONST OF PCC ROAD FROM EKKA BAURI HOUSE TO SEKH NASHIB HOUSE |
135500 |
CONST OF PCC ROAD FROM EKKA BAURI HOUSE TO SEKH NASHIB HOUSE1 |
Plinth level |
-

latitude : 23.71554828,23.71554318
Longitude : 87.21030799,87.20999938
file name : Image_12052023170719895.png
|
2023-05-12 17:07:19.956597 |
266 |
58119292 |
CONST OF PCC ROAD FROM BIPAD BAURI HOUSE TO FP SCHOOL AT SAN X |
200000 |
CONST OF PCC ROAD FROM BIPAD BAURI HOUSE TO FP SCHOOL AT SAN X1 |
Plinth level |
-

latitude : 23.71487365,23.71486154
Longitude : 87.21660641,87.21668846
file name : Image_16052023154953175.png
|
2023-05-16 15:49:53.245139 |
267 |
58102039 |
CONST OF PCC ROAD FROM ACHINTYA LAHA POND TO KUMARESH BAG HOUSE |
235500 |
CONST OF PCC ROAD FROM ACHINTYA LAHA POND TO KUMARESH BAG HOUSE1 |
Plinth level |
-

latitude : 23.73793408,23.73784565
Longitude : 87.18335743,87.18341121
file name : Image_19052023143335411.png
|
2023-05-19 14:33:35.48166 |
268 |
58102039 |
CONST OF PCC ROAD FROM ACHINTYA LAHA POND TO KUMARESH BAG HOUSE |
235500 |
CONST OF PCC ROAD FROM ACHINTYA LAHA POND TO KUMARESH BAG HOUSE1 |
Plinth level |
-

latitude : 23.73793393,23.73787399
Longitude : 87.18336347,87.18334667
file name : Image_19052023142717762.png
|
2023-05-19 14:27:17.826674 |
269 |
58158013 |
CONST OF CHANGING ROOM FOR LADIES AT NIMSHA AMGORE POND |
98000 |
CONST OF CHANGING ROOM FOR LADIES AT NIMSHA AMGORE POND1 |
Plinth level |
-

latitude : 23.72215299
Longitude : 87.20828948
file name : Image_19052023183125068.png
|
2023-05-19 18:31:25.124542 |
270 |
58158013 |
CONST OF CHANGING ROOM FOR LADIES AT NIMSHA AMGORE POND |
98000 |
CONST OF CHANGING ROOM FOR LADIES AT NIMSHA AMGORE POND1 |
Plinth level |
-

latitude : 23.72215299
Longitude : 87.20828948
file name : Image_19052023183119471.png
|
2023-05-19 18:31:19.529846 |
271 |
58158013 |
CONST OF CHANGING ROOM FOR LADIES AT NIMSHA AMGORE POND |
98000 |
CONST OF CHANGING ROOM FOR LADIES AT NIMSHA AMGORE POND1 |
Plinth level |
-

latitude : 23.72216262
Longitude : 87.20827665
file name : Image_19052023183116195.png
|
2023-05-19 18:31:16.259324 |
272 |
58158392 |
CONST OF PCC ROAD FROM DULAL MONDAL HOUSE TO MALBANDI SHAMSHAN AT SAN XIV |
150000 |
CONST OF PCC ROAD FROM DULAL MONDAL HOUSE TO MALBANDI SHAMSHAN AT SAN XIV1 |
Plinth level |
-

latitude : 23.72210461,23.72212638
Longitude : 87.19897125,87.19892033
file name : Image_22052023150115418.png
|
2023-05-22 15:01:15.486567 |
273 |
58157017 |
CONST OF PUCCA DRAIN FROM AKAL RUIDAS HOUSE TO DHIRAJ DAS HOUSE AT SAN XII |
300000 |
CONST OF PUCCA DRAIN FROM AKAL RUIDAS HOUSE TO DHIRAJ DAS HOUSE AT SAN XII1 |
Plinth level |
-

latitude : 23.72113586,23.72113734
Longitude : 87.2109099,87.21090517
file name : Image_24052023145618219.png
|
2023-05-24 14:56:18.277732 |
274 |
58118744 |
CONST OF PCC ROAD FROM SHYAMAL GHOSH HOUSE TO MANOJ MONDAL HOUSE AT SAN X |
50000 |
CONST OF PCC ROAD FROM SHYAMAL GHOSH HOUSE TO MANOJ MONDAL HOUSE AT SAN X1 |
Completion of work |
-

latitude : 23.7153514,23.7152625
Longitude : 87.2131531,87.2131793
file name : Image_25052023161327693.png
|
2023-05-25 16:13:27.764141 |
275 |
48657034 |
CONST OF PCC ROAD FROM SAJID HOUSE TO SONAI HOUSE |
119976 |
CONST OF PCC ROAD FROM SAJID HOUSE TO SONAI HOUSE1 |
Completion of work |
-

latitude : 23.7369569,23.7369648
Longitude : 87.17871641,87.17868676
file name : Image_28022023192946543.png
|
2023-02-28 19:29:46.57876 |
276 |
58115691 |
CONST OF PCC ROAD FROM MANGAL GOSH TO TOWORS AJOY REVER GHAT AT SAN VII |
228000 |
CONST OF PCC ROAD FROM MANGAL GOSH TO TOWORS AJOY REVER GHAT AT SAN VII1 |
Plinth level |
-

latitude : 23.74030316,23.73994067
Longitude : 87.22004702,87.21996397
file name : Image_27032023152139310.png
|
2023-03-27 15:21:39.372641 |
277 |
67405519 |
Construction of Sheds |
222209 |
CONSTRUCTION OF PUBLIC SHED AT NIMSHA BATHAN BORTOLA SANSAD XIII |
Completion of work |
-

latitude : 23.72107185
Longitude : 87.19856508
file name : Image_13012025165328910.png
|
2025-01-13 16:53:20.663873 |
278 |
67405519 |
Construction of Sheds |
222209 |
CONSTRUCTION OF PUBLIC SHED AT NIMSHA BATHAN BORTOLA SANSAD XIII |
Plinth level |
-

latitude : 23.72108731
Longitude : 87.19854678
file name : Image_13012025171928405.png
|
2025-01-13 17:19:20.185941 |
279 |
67405519 |
Construction of Sheds |
222209 |
CONSTRUCTION OF PUBLIC SHED AT NIMSHA BATHAN BORTOLA SANSAD XIII |
Roof laid |
-

latitude : 23.72106034
Longitude : 87.19855142
file name : Image_13012025172135457.png
|
2025-01-13 17:21:27.259505 |
280 |
67429918 |
Creation of a new source of drinking water |
49406 |
REPAIRING OF TUBEWELL OTHER WATER SYSTEM AT SHYAMLA MOUZA |
Completion of work |
-

latitude : 23.71549992
Longitude : 87.20918972
file name : Image_20062024133757788.png
|
2024-06-20 13:37:57.933691 |
281 |
67429918 |
Creation of a new source of drinking water |
49406 |
REPAIRING OF TUBEWELL OTHER WATER SYSTEM AT SHYAMLA MOUZA |
Plinth level |
-

latitude : 23.71546315
Longitude : 87.20930582
file name : Image_20062024134105103.png
|
2024-06-20 13:41:05.214559 |
282 |
67429918 |
Creation of a new source of drinking water |
49406 |
REPAIRING OF TUBEWELL OTHER WATER SYSTEM AT SHYAMLA MOUZA |
Roof laid |
-

latitude : 23.71545904
Longitude : 87.20923911
file name : Image_20062024134252308.png
|
2024-06-20 13:42:52.427661 |
283 |
94226850 |
Construction of Community Sanitary Complex |
102146 |
Construction of Community Sanitary Complex at Shyamla SBM village under Shyamla GP |
Completion of work |
-

latitude : 23.74727026
Longitude : 87.20289417
file name : Image_22072024141249553.png
|
2024-07-22 14:12:49.631456 |
284 |
94226850 |
Construction of Community Sanitary Complex |
102146 |
Construction of Community Sanitary Complex at Shyamla SBM village under Shyamla GP |
Plinth level |
-

latitude : 23.74720674
Longitude : 87.20293167
file name : Image_22072024141550274.png
|
2024-07-22 14:15:50.365647 |
285 |
94226850 |
Construction of Community Sanitary Complex |
102146 |
Construction of Community Sanitary Complex at Shyamla SBM village under Shyamla GP |
Roof laid |
-

latitude : 23.74718743
Longitude : 87.20286482
file name : Image_22072024141753107.png
|
2024-07-22 14:17:53.220899 |
286 |
94224572 |
Construction of Community Sanitary Complex |
102146 |
Construction of Community Sanitary Complex at Nimsha SBM village Khottadihi under Shyamla GP |
Completion of work |
-

latitude : 23.7202874
Longitude : 87.2128448
file name : Image_22072024123946423.png
|
2024-07-22 12:39:46.51721 |
287 |
94224572 |
Construction of Community Sanitary Complex |
102146 |
Construction of Community Sanitary Complex at Nimsha SBM village Khottadihi under Shyamla GP |
Plinth level |
-

latitude : 23.72051819
Longitude : 87.21427697
file name : Image_22072024124212904.png
|
2024-07-22 12:42:12.981574 |
288 |
94224572 |
Construction of Community Sanitary Complex |
102146 |
Construction of Community Sanitary Complex at Nimsha SBM village Khottadihi under Shyamla GP |
Roof laid |
-

latitude : 23.72052487
Longitude : 87.21424559
file name : Image_22072024124337563.png
|
2024-07-22 12:43:37.656217 |
289 |
97982302 |
Creation of Shed for segregation and processing of wet and dry waste |
349825 |
OFFICE AND STORE ROOM AT SWM PROJECT UNDER SHYAMLA GP OUT OF 15TH FC |
Completion of work |
-

latitude : 23.71959299
Longitude : 87.21733599
file name : Image_16012025171645748.png
|
2025-01-16 17:16:35.404761 |
290 |
97982302 |
Creation of Shed for segregation and processing of wet and dry waste |
349825 |
OFFICE AND STORE ROOM AT SWM PROJECT UNDER SHYAMLA GP OUT OF 15TH FC |
Plinth level |
-

latitude : 23.717879
Longitude : 87.2157607
file name : Image_16012025171904180.png
|
2025-01-16 17:18:53.839536 |
291 |
97982302 |
Creation of Shed for segregation and processing of wet and dry waste |
349825 |
OFFICE AND STORE ROOM AT SWM PROJECT UNDER SHYAMLA GP OUT OF 15TH FC |
Roof laid |
-

latitude : 23.717879
Longitude : 87.2157607
file name : Image_16012025172055912.png
|
2025-01-16 17:20:45.568992 |
292 |
67366882 |
Construction of roads |
50000 |
Construction of roads1 |
Completion of work |
-

latitude : 23.74101387,23.74101574
Longitude : 87.20962647,87.20962563
file name : Image_05042024183456576.png
|
2024-04-05 18:34:56.562774 |
293 |
67366882 |
Construction of roads |
50000 |
Construction of roads1 |
Completion of work |
-

latitude : 23.7410116,23.74101965
Longitude : 87.20962835,87.20960964
file name : Image_05042024183637159.png
|
2024-04-05 18:36:37.248298 |
294 |
67366882 |
Construction of roads |
50000 |
Construction of roads1 |
Plinth level |
-

latitude : 23.74103055,23.74104903
Longitude : 87.20963384,87.20963162
file name : Image_05042024184348996.png
|
2024-04-05 18:43:48.979178 |
295 |
67366882 |
Construction of roads |
50000 |
Construction of roads1 |
Roof laid |
-

latitude : 23.74104201,23.74104263
Longitude : 87.20965862,87.20965741
file name : Image_05042024184612880.png
|
2024-04-05 18:46:12.863279 |
296 |
34561544 |
PCC ROAD FROM DHIREN BADYAKAR HOUSE TO BIPAD MONDAL HOUSE |
140854 |
PCC ROAD FROM DHIREN BADYAKAR HOUSE TO BIPAD MONDAL HOUSE1 |
Completion of work |
-

latitude : 23.71368909,23.71364456
Longitude : 87.21434222,87.21436184
file name : Image_28022023184933390.png
|
2023-02-28 18:49:33.459514 |
297 |
34561544 |
PCC ROAD FROM DHIREN BADYAKAR HOUSE TO BIPAD MONDAL HOUSE |
140854 |
PCC ROAD FROM DHIREN BADYAKAR HOUSE TO BIPAD MONDAL HOUSE1 |
Plinth level |
-

latitude : 23.71795201,23.71796077,23.71802826
Longitude : 87.21328665,87.21329989,87.2133152
file name : Image_09082024125920788.png
|
2024-08-09 12:59:20.887318 |
298 |
94232053 |
Creation of a new source of drinking water |
75000 |
Maintenance and repairing of Drinking water systems at Forfori Village |
Completion of work |
-

latitude : 23.73949503
Longitude : 87.18892406
file name : Image_13082024150611714.png
|
2024-08-13 15:06:11.802343 |
299 |
94232053 |
Creation of a new source of drinking water |
75000 |
Maintenance and repairing of Drinking water systems at Forfori Village |
Plinth level |
-

latitude : 23.73955112
Longitude : 87.18891148
file name : Image_13082024151638481.png
|
2024-08-13 15:16:38.554733 |
300 |
94232053 |
Creation of a new source of drinking water |
75000 |
Maintenance and repairing of Drinking water systems at Forfori Village |
Roof laid |
-

latitude : 23.73954826
Longitude : 87.1888954
file name : Image_13082024151854406.png
|
2024-08-13 15:18:54.517695 |
301 |
94231057 |
Creation of a new source of drinking water |
90000 |
Maintenance and repairing of Drinking water systems at Bhuri Village |
Completion of work |
-

latitude : 23.73508409
Longitude : 87.18238167
file name : Image_13082024152836666.png
|
2024-08-13 15:28:36.772338 |
302 |
94231057 |
Creation of a new source of drinking water |
90000 |
Maintenance and repairing of Drinking water systems at Bhuri Village |
Completion of work |
-

latitude : 23.73508409
Longitude : 87.18238167
file name : Image_13082024153101103.png
|
2024-08-13 15:31:01.216691 |
303 |
94231057 |
Creation of a new source of drinking water |
90000 |
Maintenance and repairing of Drinking water systems at Bhuri Village |
Plinth level |
-

latitude : 23.73508136
Longitude : 87.1823717
file name : Image_13082024153522128.png
|
2024-08-13 15:35:22.256645 |
304 |
94231057 |
Creation of a new source of drinking water |
90000 |
Maintenance and repairing of Drinking water systems at Bhuri Village |
Plinth level |
-

latitude : 23.73508511
Longitude : 87.18238322
file name : Image_13082024153643558.png
|
2024-08-13 15:36:43.674105 |
305 |
94231057 |
Creation of a new source of drinking water |
90000 |
Maintenance and repairing of Drinking water systems at Bhuri Village |
Roof laid |
-

latitude : 23.7153917
Longitude : 87.2130288
file name : Image_13082024170117262.png
|
2024-08-13 17:01:17.364615 |
306 |
94232835 |
Creation of a new source of drinking water |
75000 |
Maintenance and repairing of Drinking water systems at Chhatrishgonda Village |
Completion of work |
-

latitude : 23.73817248
Longitude : 87.21917113
file name : Image_13082024143315162.png
|
2024-08-13 14:33:15.251075 |
307 |
94232835 |
Creation of a new source of drinking water |
75000 |
Maintenance and repairing of Drinking water systems at Chhatrishgonda Village |
Plinth level |
-

latitude : 23.73818202
Longitude : 87.21919002
file name : Image_13082024144019418.png
|
2024-08-13 14:40:19.528994 |
308 |
94232835 |
Creation of a new source of drinking water |
75000 |
Maintenance and repairing of Drinking water systems at Chhatrishgonda Village |
Plinth level |
-

latitude : 23.73818675
Longitude : 87.2191707
file name : Image_13082024144130452.png
|
2024-08-13 14:41:30.553052 |
309 |
94232835 |
Creation of a new source of drinking water |
75000 |
Maintenance and repairing of Drinking water systems at Chhatrishgonda Village |
Plinth level |
-

latitude : 23.73818675
Longitude : 87.2191707
file name : Image_13082024144139925.png
|
2024-08-13 14:41:40.035401 |
310 |
94232835 |
Creation of a new source of drinking water |
75000 |
Maintenance and repairing of Drinking water systems at Chhatrishgonda Village |
Roof laid |
-

latitude : 23.73819421
Longitude : 87.21917449
file name : Image_13082024144527527.png
|
2024-08-13 14:45:27.617265 |
311 |
97975219 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
350000 |
CONST OF BOUNDARY WALL BESIDE TELEPHONE EXCHANGE OFFICE OUT OF 15TH FC |
Completion of work |
-

latitude : 23.71464322
Longitude : 87.21437022
file name : Image_24012025140830595.png
|
2025-01-24 14:08:14.966038 |
312 |
97975219 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
350000 |
CONST OF BOUNDARY WALL BESIDE TELEPHONE EXCHANGE OFFICE OUT OF 15TH FC |
Plinth level |
-

latitude : 23.71460779
Longitude : 87.21434535
file name : Image_24012025141740417.png
|
2025-01-24 14:17:24.564328 |
313 |
97975219 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
350000 |
CONST OF BOUNDARY WALL BESIDE TELEPHONE EXCHANGE OFFICE OUT OF 15TH FC |
Roof laid |
-

latitude : 23.7146031
Longitude : 87.2144023
file name : Image_24012025142830014.png
|
2025-01-24 14:28:14.29827 |
314 |
97994963 |
Creation of a new source of drinking water |
348667 |
CONST. OF NEW WELL AT ICDS CENTRE SANSAD XI |
Completion of work |
-

latitude : 23.715069
Longitude : 87.2134604
file name : Image_19112024161155854.png
|
2024-11-19 16:11:55.95966 |
315 |
97994963 |
Creation of a new source of drinking water |
348667 |
CONST. OF NEW WELL AT ICDS CENTRE SANSAD XI |
Plinth level |
-

latitude : 23.71449304
Longitude : 87.21355781
file name : Image_19112024161741420.png
|
2024-11-19 16:17:41.562586 |
316 |
97994963 |
Creation of a new source of drinking water |
348667 |
CONST. OF NEW WELL AT ICDS CENTRE SANSAD XI |
Roof laid |
-

latitude : 23.71446056
Longitude : 87.21352679
file name : Image_19112024161903107.png
|
2024-11-19 16:19:03.209901 |
317 |
67432769 |
Connecting septic tanks with soak pits |
50000 |
CONSTRUCTION OF SOAKPIT AT ALINAGAR ICDS CENTRE |
Completion of work |
-

latitude : 23.72320314
Longitude : 87.19928048
file name : Image_15122023134306302.png
|
2023-12-15 13:43:06.358629 |
318 |
67432769 |
Connecting septic tanks with soak pits |
50000 |
CONSTRUCTION OF SOAKPIT AT ALINAGAR ICDS CENTRE |
Plinth level |
-

latitude : 23.723273
Longitude : 87.19934545
file name : Image_15122023135026366.png
|
2023-12-15 13:50:26.422143 |
319 |
67432769 |
Connecting septic tanks with soak pits |
50000 |
CONSTRUCTION OF SOAKPIT AT ALINAGAR ICDS CENTRE |
Roof laid |
-

latitude : 23.72319942
Longitude : 87.19931654
file name : Image_15122023135216020.png
|
2023-12-15 13:52:16.078325 |
320 |
97976565 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
149025 |
CONST OF BOUNDARY WALL AT BHURI PRIMARY SCHOOL UNDER SHYAMLA GP OUT OF 15TH FC |
Completion of work |
-

latitude : 23.73634168
Longitude : 87.17984722
file name : Image_11122024154424940.png
|
2024-12-11 15:44:25.033321 |
321 |
97976565 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
149025 |
CONST OF BOUNDARY WALL AT BHURI PRIMARY SCHOOL UNDER SHYAMLA GP OUT OF 15TH FC |
Plinth level |
-

latitude : 23.73634532
Longitude : 87.17984516
file name : Image_11122024154827405.png
|
2024-12-11 15:48:27.501915 |
322 |
97976565 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
149025 |
CONST OF BOUNDARY WALL AT BHURI PRIMARY SCHOOL UNDER SHYAMLA GP OUT OF 15TH FC |
Roof laid |
-

latitude : 23.7363268
Longitude : 87.17979315
file name : Image_11122024155232291.png
|
2024-12-11 15:52:32.066106 |
323 |
97971014 |
Construction of roads |
200000 |
PCC ROAD FROM MELA MAIDAN TO KOTALIA POND AT CHHATRISHGONDA SANSAD VII OUT OF 15TH FC |
Completion of work |
-

latitude : 23.71826369,23.73706222,23.73704701
Longitude : 87.20777842,87.21702488,87.21704329
file name : Image_11122024150812635.png
|
2024-12-11 15:08:12.737349 |
324 |
97971014 |
Construction of roads |
200000 |
PCC ROAD FROM MELA MAIDAN TO KOTALIA POND AT CHHATRISHGONDA SANSAD VII OUT OF 15TH FC |
Plinth level |
-

latitude : 23.73701751,23.73704201
Longitude : 87.21704894,87.21707096
file name : Image_11122024151920633.png
|
2024-12-11 15:19:20.731088 |
325 |
97971014 |
Construction of roads |
200000 |
PCC ROAD FROM MELA MAIDAN TO KOTALIA POND AT CHHATRISHGONDA SANSAD VII OUT OF 15TH FC |
Roof laid |
-

latitude : 23.73704862,23.73707745
Longitude : 87.21703715,87.21698062
file name : Image_11122024152406541.png
|
2024-12-11 15:24:06.638045 |
326 |
97977282 |
Construction of roads |
200000 |
PCC ROAD FROM SEKH KETUBUL HOUSE TO SK SAHID HOUSE AT SANSAD XV |
Completion of work |
-

latitude : 23.71838602,23.71836527
Longitude : 87.20777651,87.20778977
file name : Image_11122024144320582.png
|
2024-12-11 14:43:20.683822 |
327 |
97977282 |
Construction of roads |
200000 |
PCC ROAD FROM SEKH KETUBUL HOUSE TO SK SAHID HOUSE AT SANSAD XV |
Completion of work |
-

latitude : 23.7198383,23.7198383
Longitude : 87.2100367,87.2100367
file name : Image_11122024144634005.png
|
2024-12-11 14:46:34.093283 |
328 |
97977282 |
Construction of roads |
200000 |
PCC ROAD FROM SEKH KETUBUL HOUSE TO SK SAHID HOUSE AT SANSAD XV |
Plinth level |
-

latitude : 23.71838542,23.71833359
Longitude : 87.20780727,87.20781233
file name : Image_11122024145058863.png
|
2024-12-11 14:50:58.945002 |
329 |
97977282 |
Construction of roads |
200000 |
PCC ROAD FROM SEKH KETUBUL HOUSE TO SK SAHID HOUSE AT SANSAD XV |
Roof laid |
-

latitude : 23.71834185,23.71826558
Longitude : 87.20781255,87.20781351
file name : Image_11122024145344967.png
|
2024-12-11 14:53:45.053877 |
330 |
97972319 |
Construction of roads |
200000 |
PCC ROAD FROM UJJWAL GHOSH HOUSE TO KAJAL PAL HOUSE AT SAN XI OUT OF 15TH FC |
Completion of work |
-

latitude : 23.7150746,23.7150746
Longitude : 87.2137716,87.2137716
file name : Image_17122024165127624.png
|
2024-12-17 16:51:27.713278 |
331 |
97972319 |
Construction of roads |
200000 |
PCC ROAD FROM UJJWAL GHOSH HOUSE TO KAJAL PAL HOUSE AT SAN XI OUT OF 15TH FC |
Plinth level |
-

latitude : 23.71500763,23.71501405
Longitude : 87.21420967,87.21420809
file name : Image_17122024165259470.png
|
2024-12-17 16:52:59.553206 |
332 |
97972319 |
Construction of roads |
200000 |
PCC ROAD FROM UJJWAL GHOSH HOUSE TO KAJAL PAL HOUSE AT SAN XI OUT OF 15TH FC |
Roof laid |
-

latitude : 23.7150746,23.7150522
Longitude : 87.2137716,87.2142387
file name : Image_17122024165526312.png
|
2024-12-17 16:55:26.392654 |
333 |
97990474 |
Any other operation and maintenance needs related to solid waste management |
350000 |
CONST OF BOUNDARY WALL AT SWM PROJECT UNDER SHYAMLA GP OUT OF 15TH FC |
Completion of work |
-

latitude : 23.71961971
Longitude : 87.21738698
file name : Image_17122024161743859.png
|
2024-12-17 16:17:43.952869 |
334 |
97990474 |
Any other operation and maintenance needs related to solid waste management |
350000 |
CONST OF BOUNDARY WALL AT SWM PROJECT UNDER SHYAMLA GP OUT OF 15TH FC |
Plinth level |
-

latitude : 23.71961919
Longitude : 87.21736092
file name : Image_17122024161959081.png
|
2024-12-17 16:19:59.240699 |
335 |
97990474 |
Any other operation and maintenance needs related to solid waste management |
350000 |
CONST OF BOUNDARY WALL AT SWM PROJECT UNDER SHYAMLA GP OUT OF 15TH FC |
Roof laid |
-

latitude : 23.71963109
Longitude : 87.21737585
file name : Image_17122024162114021.png
|
2024-12-17 16:21:14.112982 |
336 |
67367496 |
Construction of roads |
217000 |
CONSTRUCTION OF PCC ROAD FROM ISRAFIL MIYAZ HOUSE TO GANGA BHATTACHARYA HOUSE |
Completion of work |
-

latitude : 23.73819882,23.73823287
Longitude : 87.21084669,87.2108494
file name : Image_05042024181800927.png
|
2024-04-05 18:18:01.037559 |
337 |
67367496 |
Construction of roads |
217000 |
CONSTRUCTION OF PCC ROAD FROM ISRAFIL MIYAZ HOUSE TO GANGA BHATTACHARYA HOUSE |
Plinth level |
-

latitude : 23.73824589,23.73824623
Longitude : 87.2107951,87.21079329
file name : Image_05042024182417233.png
|
2024-04-05 18:24:17.320783 |
338 |
67367496 |
Construction of roads |
217000 |
CONSTRUCTION OF PCC ROAD FROM ISRAFIL MIYAZ HOUSE TO GANGA BHATTACHARYA HOUSE |
Roof laid |
-

latitude : 23.738252,23.73825389
Longitude : 87.2108233,87.21081372
file name : Image_05042024182648602.png
|
2024-04-05 18:26:48.688109 |
339 |
67368983 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-

latitude : 23.71379045,23.71375107
Longitude : 87.21529398,87.21527366
file name : Image_18042024133159168.png
|
2024-04-18 13:31:59.280322 |
340 |
67368983 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-

latitude : 23.71375695,23.71375722
Longitude : 87.21540403,87.21541851
file name : Image_18042024134101414.png
|
2024-04-18 13:41:01.505084 |
341 |
67368983 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-

latitude : 23.71376287,23.71376287
Longitude : 87.21542459,87.21543021
file name : Image_18042024134314197.png
|
2024-04-18 13:43:14.292021 |
342 |
67432273 |
Creation of a new source of drinking water |
76000 |
REPAIRING OF WELL WITH SOAKPIT NEAR DHIREN BAURI HOUSE AT BHURI |
Completion of work |
-

latitude : 23.73639739
Longitude : 87.18104549
file name : Image_30052024124013970.png
|
2024-05-30 12:40:14.068342 |
343 |
67432273 |
Creation of a new source of drinking water |
76000 |
REPAIRING OF WELL WITH SOAKPIT NEAR DHIREN BAURI HOUSE AT BHURI |
Plinth level |
-

latitude : 23.73641773
Longitude : 87.18104971
file name : Image_30052024124734920.png
|
2024-05-30 12:47:35.025725 |
344 |
67432273 |
Creation of a new source of drinking water |
76000 |
REPAIRING OF WELL WITH SOAKPIT NEAR DHIREN BAURI HOUSE AT BHURI |
Roof laid |
-

latitude : 23.7364413
Longitude : 87.18104293
file name : Image_30052024125204055.png
|
2024-05-30 12:52:04.140088 |
345 |
97980402 |
BharatNet Wifi Facility/ Internet / Telephone |
180000 |
TELEPHONE AND INTERNET BILL AND COMPUTER ZEROX MAINTAINANCE |
|
-

latitude : 23.7202625
Longitude : 87.2127856
file name : Image_25022025163519779.png
|
2025-02-25 16:35:19.863869 |
346 |
97996294 |
Creation of a new source of drinking water |
350000 |
TUBEWELL REPAIRING AT ALL SANSAD OUT OF 15TH FC FUND UNDER SHYAMLA GP |
Roof laid |
-

latitude : 23.7183743
Longitude : 87.2112817
file name : Image_27022025155607551.png
|
2025-02-27 15:56:07.639798 |
347 |
97996294 |
Creation of a new source of drinking water |
350000 |
TUBEWELL REPAIRING AT ALL SANSAD OUT OF 15TH FC FUND UNDER SHYAMLA GP |
Completion of work |
-

latitude : 23.71891477
Longitude : 87.21106334
file name : Image_27022025134705631.png
|
2025-02-27 13:47:05.719094 |
348 |
97996294 |
Creation of a new source of drinking water |
350000 |
TUBEWELL REPAIRING AT ALL SANSAD OUT OF 15TH FC FUND UNDER SHYAMLA GP |
Completion of work |
-

latitude : 23.7183743
Longitude : 87.2112817
file name : Image_27022025134702523.png
|
2025-02-27 13:47:02.612471 |
349 |
97996294 |
Creation of a new source of drinking water |
350000 |
TUBEWELL REPAIRING AT ALL SANSAD OUT OF 15TH FC FUND UNDER SHYAMLA GP |
Plinth level |
-

latitude : 23.71894598
Longitude : 87.21104952
file name : Image_27022025155355243.png
|
2025-02-27 15:53:55.340343 |
350 |
94233796 |
Creation of a new source of drinking water |
75000 |
Maintenance and repairing of Drinking water systems at Nimsha Village |
Completion of work |
-

latitude : 23.71609252
Longitude : 87.21355067
file name : Image_22072024130841139.png
|
2024-07-22 13:08:41.239641 |
351 |
94233796 |
Creation of a new source of drinking water |
75000 |
Maintenance and repairing of Drinking water systems at Nimsha Village |
Roof laid |
-

latitude : 23.7158122
Longitude : 87.2134604
file name : Image_22072024131434145.png
|
2024-07-22 13:14:34.248226 |
352 |
94233796 |
Creation of a new source of drinking water |
75000 |
Maintenance and repairing of Drinking water systems at Nimsha Village |
Plinth level |
-

latitude : 23.7153572
Longitude : 87.2130788
file name : Image_22072024131201589.png
|
2024-07-22 13:12:01.672807 |