1 |
39103540 |
INSTALLATION OF TUBEWELL WITH PLATFROM AND SOKEPIT AT AYMAPARA |
66812 |
INSTALLATION OF TUBEWELL WITH PLATFROM AND SOKEPIT AT AYMAPARA1 |
Roof laid |
-
latitude : 23.284863266162574
Longitude : 88.24534764513373
file name : Image_23102021114202466.png
|
2021-10-23 11:42:02.5847 |
2 |
39103540 |
INSTALLATION OF TUBEWELL WITH PLATFROM AND SOKEPIT AT AYMAPARA |
66812 |
INSTALLATION OF TUBEWELL WITH PLATFROM AND SOKEPIT AT AYMAPARA1 |
Plinth level |
-
latitude : 23.284823787398636
Longitude : 88.24534261599183
file name : Image_31072021115116507.png
|
2021-07-31 11:51:16.619907 |
3 |
39103540 |
INSTALLATION OF TUBEWELL WITH PLATFROM AND SOKEPIT AT AYMAPARA |
66812 |
INSTALLATION OF TUBEWELL WITH PLATFROM AND SOKEPIT AT AYMAPARA1 |
Completion of work |
-
latitude : 23.280461677350104
Longitude : 88.2404604088515
file name : Image_15022021152705902.png
|
2021-02-15 15:27:06.000698 |
4 |
39106515 |
CONSTRUCTION OF CONCRETE ROAD FROM SWAPAN BANERJEE HOUSE TO SIMLON SAMABAY |
792935 |
CONSTRUCTION OF CONCRETE ROAD FROM SWAPAN BANERJEE HOUSE TO SIMLON SAMABAY1 |
Roof laid |
-
latitude : 23.269606945104897,23.269600281491876
Longitude : 88.25203724205494,88.25205501168966
file name : Image_23022021103759800.png
|
2021-02-23 10:37:59.894457 |
5 |
39106515 |
CONSTRUCTION OF CONCRETE ROAD FROM SWAPAN BANERJEE HOUSE TO SIMLON SAMABAY |
792935 |
CONSTRUCTION OF CONCRETE ROAD FROM SWAPAN BANERJEE HOUSE TO SIMLON SAMABAY1 |
Plinth level |
-
latitude : 23.26932900119573,23.26933667063713
Longitude : 88.25179642997682,88.25175887905061
file name : Image_12022021131327789.png
|
2021-02-12 13:13:27.895689 |
6 |
39106515 |
CONSTRUCTION OF CONCRETE ROAD FROM SWAPAN BANERJEE HOUSE TO SIMLON SAMABAY |
792935 |
CONSTRUCTION OF CONCRETE ROAD FROM SWAPAN BANERJEE HOUSE TO SIMLON SAMABAY1 |
Completion of work |
-
latitude : 23.26848942786455,23.268487164750695
Longitude : 88.25161328539252,88.25159241445363
file name : Image_09022021125435437.png
|
2021-02-09 12:54:35.527422 |
7 |
39106535 |
CONSTRUCTION OF CONCRETE ROAD from ASHOK GHOSH HOUSE TO MONGAL TUDU HOUSE |
1238294 |
CONSTRUCTION OF CONCRETE ROAD from ASHOK GHOSH HOUSE TO MONGAL TUDU HOUSE1 |
Roof laid |
-
latitude : 23.28495073132217,23.285047123208642
Longitude : 88.27475714497268,88.27473979443312
file name : Image_04032021124937229.png
|
2021-03-04 12:49:37.363677 |
8 |
39106535 |
CONSTRUCTION OF CONCRETE ROAD from ASHOK GHOSH HOUSE TO MONGAL TUDU HOUSE |
1238294 |
CONSTRUCTION OF CONCRETE ROAD from ASHOK GHOSH HOUSE TO MONGAL TUDU HOUSE1 |
Plinth level |
-
latitude : 23.285006638616323,23.28503136523068
Longitude : 88.27490801922977,88.2749168202281
file name : Image_26022021145925529.png
|
2021-02-26 14:59:25.731108 |
9 |
39106535 |
CONSTRUCTION OF CONCRETE ROAD from ASHOK GHOSH HOUSE TO MONGAL TUDU HOUSE |
1238294 |
CONSTRUCTION OF CONCRETE ROAD from ASHOK GHOSH HOUSE TO MONGAL TUDU HOUSE1 |
Completion of work |
-
latitude : 23.28506221063435,23.2850086921826
Longitude : 88.27716710977256,88.27719477005303
file name : Image_24022021145529591.png
|
2021-02-24 14:55:29.699707 |
10 |
39106555 |
CONSTRUCTION OF CONCRETE ROAD MAIN ROAD TO BELLAL SK HOUSE |
434702 |
CONSTRUCTION OF CONCRETE ROAD MAIN ROAD TO BELLAL SK HOUSE1 |
Roof laid |
-
latitude : 23.293654918670654,23.293626084923744
Longitude : 88.27543104998767,88.27542928978801
file name : Image_04032021123836841.png
|
2021-03-04 12:38:36.941661 |
11 |
39106555 |
CONSTRUCTION OF CONCRETE ROAD MAIN ROAD TO BELLAL SK HOUSE |
434702 |
CONSTRUCTION OF CONCRETE ROAD MAIN ROAD TO BELLAL SK HOUSE1 |
Plinth level |
-
latitude : 23.293598257005215,23.293600101023912
Longitude : 88.27548561617732,88.27548419125378
file name : Image_26022021144936233.png
|
2021-02-26 14:49:36.338814 |
12 |
39106555 |
CONSTRUCTION OF CONCRETE ROAD MAIN ROAD TO BELLAL SK HOUSE |
434702 |
CONSTRUCTION OF CONCRETE ROAD MAIN ROAD TO BELLAL SK HOUSE1 |
Completion of work |
-
latitude : 23.293604752980173,23.293604752980173
Longitude : 88.27545460313559,88.27545460313559
file name : Image_24022021144257994.png
|
2021-02-24 14:42:58.130128 |
13 |
39105486 |
FIFY NOS OF TUBEWELL PLATFORM OF GP VILLAGE AREA |
349250 |
FIFY NOS OF TUBEWELL PLATFORM OF GP VILLAGE AREA1 |
Roof laid |
-
latitude : 23.28954648692161
Longitude : 88.24641055427492
file name : Image_23102021114156755.png
|
2021-10-23 11:41:56.853824 |
14 |
39105486 |
FIFY NOS OF TUBEWELL PLATFORM OF GP VILLAGE AREA |
349250 |
FIFY NOS OF TUBEWELL PLATFORM OF GP VILLAGE AREA1 |
Plinth level |
-
latitude : 23.28954028431326
Longitude : 88.24646042659879
file name : Image_09072021110222104.png
|
2021-07-09 11:02:22.189526 |
15 |
39105486 |
FIFY NOS OF TUBEWELL PLATFORM OF GP VILLAGE AREA |
349250 |
FIFY NOS OF TUBEWELL PLATFORM OF GP VILLAGE AREA1 |
Completion of work |
-
latitude : 23.277958799153566
Longitude : 88.24943440966308
file name : Image_26022021153450287.png
|
2021-02-26 15:34:50.407899 |
16 |
34560518 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD |
350000 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD1 |
Completion of work |
-
latitude : 23.264873432926834
Longitude : 88.25385024771094
file name : Image_03062021113459827.png
|
2021-06-03 11:34:59.930977 |
17 |
34560518 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD |
350000 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD1 |
Completion of work |
-
latitude : 23.26362012885511
Longitude : 88.25211888179183
file name : Image_03062021113905902.png
|
2021-06-03 11:39:06.006522 |
18 |
34560518 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD |
350000 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD1 |
Completion of work |
-
latitude : 23.2968849
Longitude : 88.2640338
file name : Image_07062021091928597.png
|
2021-06-07 09:19:28.685703 |
19 |
34560518 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD |
350000 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD1 |
Completion of work |
-
latitude : 23.2969915
Longitude : 88.264055
file name : Image_07062021091937714.png
|
2021-06-07 09:19:37.794447 |
20 |
34560518 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD |
350000 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD1 |
Completion of work |
-
latitude : 23.2970723
Longitude : 88.2640942
file name : Image_07062021091950707.png
|
2021-06-07 09:19:50.795671 |
21 |
34560518 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD |
350000 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD1 |
Completion of work |
-
latitude : 23.28950642142445
Longitude : 88.24645975604653
file name : Image_09062021092830821.png
|
2021-06-09 09:28:30.911981 |
22 |
34560518 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD |
350000 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD1 |
Completion of work |
-
latitude : 23.289503823034465
Longitude : 88.24648909270763
file name : Image_09062021092836523.png
|
2021-06-09 09:28:36.61587 |
23 |
34560518 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD |
350000 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD1 |
Completion of work |
-
latitude : 23.289551809430122
Longitude : 88.24652320705354
file name : Image_09062021092844277.png
|
2021-06-09 09:28:44.377805 |
24 |
34560518 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD |
350000 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD1 |
Completion of work |
-
latitude : 23.289516186341643
Longitude : 88.2464837282896
file name : Image_09062021092850797.png
|
2021-06-09 09:28:50.893943 |
25 |
34560518 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD |
350000 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD1 |
Completion of work |
-
latitude : 23.289544726721942
Longitude : 88.246482135728
file name : Image_09062021092856772.png
|
2021-06-09 09:28:56.868098 |
26 |
34560518 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD |
350000 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD1 |
Completion of work |
-
latitude : 23.2819409
Longitude : 88.2572467
file name : Image_11062021101939239.png
|
2021-06-11 10:19:39.335808 |
27 |
34560518 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD |
350000 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD1 |
Completion of work |
-
latitude : 23.2819409
Longitude : 88.2572467
file name : Image_11062021101946141.png
|
2021-06-11 10:19:46.240185 |
28 |
34560518 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD |
350000 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD2 |
Completion of work |
-
latitude : 23.2819407
Longitude : 88.2572488
file name : Image_11062021101931999.png
|
2021-06-11 10:19:32.116255 |
29 |
34560518 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD |
350000 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD3 |
Completion of work |
-
latitude : 23.2819406
Longitude : 88.25725
file name : Image_11062021101935853.png
|
2021-06-11 10:19:35.948455 |
30 |
34560518 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD |
350000 |
PURCHACE OF TUBEWELL MATERIALS AT DIFFERENT GRAM SANSAD3 |
Completion of work |
-
latitude : 23.2819406
Longitude : 88.25725
file name : Image_11062021101942702.png
|
2021-06-11 10:19:42.803148 |
31 |
39103362 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at SIMLON-XI |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at SIMLON-XI1 |
Roof laid |
-
latitude : 23.265564814209938
Longitude : 88.25076755136251
file name : Image_23052021085415776.png
|
2021-05-23 08:54:15.896382 |
32 |
39103362 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at SIMLON-XI |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at SIMLON-XI1 |
Plinth level |
-
latitude : 23.265637401491404
Longitude : 88.25076101347804
file name : Image_24022021093022668.png
|
2021-02-24 09:30:22.777365 |
33 |
39103362 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at SIMLON-XI |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at SIMLON-XI1 |
Completion of work |
-
latitude : 23.26568467542529
Longitude : 88.25076713226736
file name : Image_12022021085232858.png
|
2021-02-12 08:52:32.95963 |
34 |
39080108 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at guptipur |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at guptipur1 |
Roof laid |
-
latitude : 23.289522766135633
Longitude : 88.24640292674303
file name : Image_23102021114150799.png
|
2021-10-23 11:41:50.934433 |
35 |
39080108 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at guptipur |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at guptipur1 |
Completion of work |
-
latitude : 23.289496824145317
Longitude : 88.24648247100413
file name : Image_09062021092825187.png
|
2021-06-09 09:28:25.29433 |
36 |
39080108 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at guptipur |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at guptipur1 |
Plinth level |
-
latitude : 23.289527627639472
Longitude : 88.2464300841093
file name : Image_09072021110218165.png
|
2021-07-09 11:02:18.255365 |
37 |
39084192 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Aymapara |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Aymapara1 |
Roof laid |
-
latitude : 23.280433723703027
Longitude : 88.2405103649944
file name : Image_09062021094737552.png
|
2021-06-09 09:47:37.666139 |
38 |
39084192 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Aymapara |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Aymapara1 |
Plinth level |
-
latitude : 23.280482925474644
Longitude : 88.2404553797096
file name : Image_04032021130223058.png
|
2021-03-04 13:02:23.185303 |
39 |
39084192 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Aymapara |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Aymapara1 |
Completion of work |
-
latitude : 23.28045736066997
Longitude : 88.24050801806152
file name : Image_26022021152706212.png
|
2021-02-26 15:27:06.310656 |
40 |
39103212 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at machalandapur |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at machalandapur1 |
Roof laid |
-
latitude : 23.27769875060767
Longitude : 88.24937774799764
file name : Image_09072021105447848.png
|
2021-07-09 10:54:47.978908 |
41 |
39103212 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at machalandapur |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at machalandapur1 |
Plinth level |
-
latitude : 23.277809307910502
Longitude : 88.24945134110749
file name : Image_26022021153207699.png
|
2021-02-26 15:32:07.800163 |
42 |
39103212 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at machalandapur |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at machalandapur1 |
Completion of work |
-
latitude : 23.27780922409147
Longitude : 88.24942242354155
file name : Image_15022021153201752.png
|
2021-02-15 15:32:01.845403 |
43 |
39103330 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Simlon-IX |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Simlon-IX1 |
Completion of work |
-
latitude : 23.271972904913127
Longitude : 88.25734684243798
file name : Image_23052021090951008.png
|
2021-05-23 09:09:51.123304 |
44 |
39103330 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Simlon-IX |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Simlon-IX1 |
Plinth level |
-
latitude : 23.272001068107784
Longitude : 88.2573460880667
file name : Image_09072021104826467.png
|
2021-07-09 10:48:26.581604 |
45 |
39103330 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Simlon-IX |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Simlon-IX1 |
Roof laid |
-
latitude : 23.27201183885336
Longitude : 88.25732446275651
file name : Image_14072021105901757.png
|
2021-07-14 10:59:01.878302 |
46 |
39103330 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Simlon-IX |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Simlon-IX1 |
Roof laid |
-
latitude : 23.271992937661707
Longitude : 88.25731960125268
file name : Image_14072021105905270.png
|
2021-07-14 10:59:05.391468 |
47 |
39103411 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Surjapur |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Surjapur1 |
Completion of work |
-
latitude : 23.268608199432492
Longitude : 88.29202579334378
file name : Image_26072021122237457.png
|
2021-07-26 12:22:37.540506 |
48 |
39103411 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Surjapur |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Surjapur1 |
Completion of work |
-
latitude : 23.268595333211124
Longitude : 88.29208094626665
file name : Image_22072021144434196.png
|
2021-07-22 14:44:34.307298 |
49 |
39103411 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Surjapur |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Surjapur1 |
Completion of work |
-
latitude : 23.26861176174134
Longitude : 88.29208941198885
file name : Image_19072021100441074.png
|
2021-07-19 10:04:41.179693 |
50 |
39103294 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Briddhapara VI |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Briddhapara VI1 |
Completion of work |
-
latitude : 23.284945408813655
Longitude : 88.26754099689424
file name : Image_26072021123442058.png
|
2021-07-26 12:34:42.153727 |
51 |
39103294 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Briddhapara VI |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Briddhapara VI1 |
Completion of work |
-
latitude : 23.2850146
Longitude : 88.2673795
file name : Image_22072021145645984.png
|
2021-07-22 14:56:46.091369 |
52 |
39103294 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Briddhapara VI |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Briddhapara VI1 |
Completion of work |
-
latitude : 23.2850165
Longitude : 88.2673777
file name : Image_19072021104229491.png
|
2021-07-19 10:42:29.600648 |
53 |
39103230 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Sankati Adibashipara -I |
308995 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Sankati Adibashipara -I1 |
Roof laid |
-
latitude : 23.2957516098395
Longitude : 88.26271436177194
file name : Image_26102021121715158.png
|
2021-10-26 12:17:15.273887 |
54 |
39103230 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Sankati Adibashipara -I |
308995 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Sankati Adibashipara -I1 |
Plinth level |
-
latitude : 23.29571477137506
Longitude : 88.2627787347883
file name : Image_01082021095306293.png
|
2021-08-01 09:53:06.398755 |
55 |
39103230 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Sankati Adibashipara -I |
308995 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Sankati Adibashipara -I1 |
Completion of work |
-
latitude : 23.295741425827146
Longitude : 88.26249207369983
file name : Image_31072021112908491.png
|
2021-07-31 11:29:08.611594 |
56 |
39103260 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Sankati Adibashipara -II |
308995 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Sankati Adibashipara -II1 |
Roof laid |
-
latitude : 23.29449906013906
Longitude : 88.26358272694051
file name : Image_26102021121718490.png
|
2021-10-26 12:17:18.592861 |
57 |
39103260 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Sankati Adibashipara -II |
308995 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Sankati Adibashipara -II1 |
Plinth level |
-
latitude : 23.29449935350567
Longitude : 88.26365715824068
file name : Image_01082021094948560.png
|
2021-08-01 09:49:48.666613 |
58 |
39103260 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Sankati Adibashipara -II |
308995 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Sankati Adibashipara -II1 |
Completion of work |
-
latitude : 23.294471316039562
Longitude : 88.2636128179729
file name : Image_31072021113247958.png
|
2021-07-31 11:32:48.05898 |
59 |
39075808 |
1 HP Submerssible Pump and Laying PVC pipe Line at Briddhapara Ful Bagan |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line at Briddhapara Ful Bagan1 |
Roof laid |
-
latitude : 23.289065156131983
Longitude : 88.27328293584287
file name : Image_26102021121721633.png
|
2021-10-26 12:17:21.733523 |
60 |
39075808 |
1 HP Submerssible Pump and Laying PVC pipe Line at Briddhapara Ful Bagan |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line at Briddhapara Ful Bagan1 |
Plinth level |
-
latitude : 23.289136695675552
Longitude : 88.27335292473435
file name : Image_23102021114319060.png
|
2021-10-23 11:43:19.164145 |
61 |
39075808 |
1 HP Submerssible Pump and Laying PVC pipe Line at Briddhapara Ful Bagan |
135000 |
1 HP Submerssible Pump and Laying PVC pipe Line at Briddhapara Ful Bagan1 |
Completion of work |
-
latitude : 23.289192728698254
Longitude : 88.2733007054776
file name : Image_23092021124143353.png
|
2021-09-23 12:41:43.452619 |
62 |
39112106 |
Repairing of Tubewell |
350000 |
Repairing of Tubewell1 |
Completion of work |
-
latitude : 23.274484500288963
Longitude : 88.24936651624739
file name : Image_24092021123947301.png
|
2021-09-24 12:39:47.412587 |
63 |
39105503 |
INSTALLATION OF TUBEWELL WITH PLATFROM AND SOKEPIT AT GUPTIPUR |
75000 |
INSTALLATION OF TUBEWELL WITH PLATFROM AND SOKEPIT AT GUPTIPUR1 |
Completion of work |
-
latitude : 23.29186517279595
Longitude : 88.24852949939668
file name : Image_24122021115034866.png
|
2021-12-24 11:50:34.993879 |
64 |
49114751 |
Construction of concrere road from moslemad main road to salam sk |
155602 |
Construction of concrere road from moslemad main road to salam sk 1 |
Completion of work |
-
latitude : 23.289066832512617,23.28906934708357
Longitude : 88.28018669039011,88.28018300235271
file name : Image_25022022121414500.png
|
2022-02-25 12:14:14.600553 |
65 |
39111368 |
CONSTRUCTION OF CONCRETE ROAD BRIDDHA PARA KABAR STHAN |
200000 |
CONSTRUCTION OF CONCRETE ROAD BRIDDHA PARA KABAR STHAN1 |
Completion of work |
-
latitude : 23.279787059873343,23.27979296911508
Longitude : 88.26776043511927,88.26776018366218
file name : Image_06012022145041161.png
|
2022-01-06 14:50:41.281534 |
66 |
49114293 |
Construction of Concrete road from simlon main road to jagat taran roy house |
302291 |
Construction of Concrete road from simlon main road to jagat taran roy house1 |
Completion of work |
-
latitude : 23.270783429034054,23.270783429034054
Longitude : 88.25316796079278,88.25316796079278
file name : Image_25022022121410617.png
|
2022-02-25 12:14:10.710393 |
67 |
39112123 |
Repairing Kitchen Shed, Toilet of different ICDS centre |
250000 |
Repairing Kitchen Shed, Toilet of different ICDS centre1 |
Completion of work |
-
latitude : 23.2818371
Longitude : 88.2571882
file name : Image_02022022133513088.png
|
2022-02-02 13:35:13.18997 |
68 |
49146052 |
Distribution System of pipe line at Sankati Adibashipara 1 |
90000 |
Distribution System of pipe line at Sankati Adibashipara 11 |
Completion of work |
-
latitude : 23.293948997743428
Longitude : 88.26394658535719
file name : Image_03022022130820061.png
|
2022-02-03 13:08:20.148419 |
69 |
49146105 |
Distribution System of pipe line at Sankatii Adibashipara 2 |
90000 |
Distribution System of pipe line at Sankatii Adibashipara 21 |
Completion of work |
-
latitude : 23.295036465860903
Longitude : 88.26406393200159
file name : Image_03022022130814184.png
|
2022-02-03 13:08:14.304903 |
70 |
49146105 |
Distribution System of pipe line at Sankatii Adibashipara 2 |
90000 |
Distribution System of pipe line at Sankatii Adibashipara 21 |
Completion of work |
-
latitude : 23.295036465860903
Longitude : 88.26406393200159
file name : Image_03022022130824330.png
|
2022-02-03 13:08:24.415102 |
71 |
49143101 |
Installation of tubewell with platfrom and sansad four |
69374 |
Installation of tubewell with platfrom and sansad four1 |
Completion of work |
-
latitude : 23.26795453671366
Longitude : 88.25825502164662
file name : Image_11032022152313652.png
|
2022-03-11 15:23:13.784022 |
72 |
49145555 |
Installation of tubewell with platfrom and soakpit at sansad eleven |
69374 |
Installation of tubewell with platfrom and soakpit at sansad eleven1 |
Completion of work |
-
latitude : 23.26390959788114
Longitude : 88.24926484376192
file name : Image_11032022125416107.png
|
2022-03-11 12:54:16.222008 |
73 |
49145444 |
Installation of tubewell with platfrom and soakpit at sansad ten |
69374 |
Installation of tubewell with platfrom and soakpit at sansad ten1 |
Completion of work |
-
latitude : 23.264865218661726
Longitude : 88.24885748326778
file name : Image_11032022125412687.png
|
2022-03-11 12:54:12.797256 |
74 |
49145365 |
Installation of tubewell with platfrom and soakpit at sansad nine |
69374 |
Installation of tubewell with platfrom and soakpit at sansad nine1 |
Completion of work |
-
latitude : 23.26452390756458
Longitude : 88.25238408520818
file name : Image_11032022125409095.png
|
2022-03-11 12:54:09.214326 |
75 |
49145942 |
INSTALLATION OF TUBEWELL platfrom and soakpit at sansad 17 |
69374 |
INSTALLATION OF TUBEWELL platfrom and soakpit at sansad 171 |
Completion of work |
-
latitude : 23.281653122976422
Longitude : 88.29373545013368
file name : Image_11032022125429031.png
|
2022-03-11 12:54:29.149642 |
76 |
49145896 |
Installation of tubewell with platfrom and soakpit at sansad 16 |
69374 |
Installation of tubewell with platfrom and soakpit at sansad 161 |
Completion of work |
-
latitude : 23.27948648482561
Longitude : 88.28812770545483
file name : Image_11032022125432276.png
|
2022-03-11 12:54:32.403372 |
77 |
49145275 |
Installation of tubewell with platfrom and soakpit at sansad eight |
69374 |
Installation of tubewell with platfrom and soakpit at sansad eight1 |
Completion of work |
-
latitude : 23.278894973918796
Longitude : 88.26017213054001
file name : Image_11032022125441979.png
|
2022-03-11 12:54:42.085136 |
78 |
49145798 |
Installation of tubewell with platfrom and soakpit at sansad 14 |
69374 |
Installation of tubewell with platfrom and soakpit at sansad 141 |
Completion of work |
-
latitude : 23.277299227192998
Longitude : 88.29138248227537
file name : Image_11032022125425835.png
|
2022-03-11 12:54:25.939799 |
79 |
39103858 |
INSTALLATION OF TUBEWELL WITH PLATFROM AND SOKEPIT AT SONDALPUR |
136001 |
INSTALLATION OF TUBEWELL WITH PLATFROM AND SOKEPIT AT SONDALPUR1 |
Completion of work |
-
latitude : 23.27745035290718
Longitude : 88.29183334484696
file name : Image_11032022152305026.png
|
2022-03-11 15:23:05.13171 |
80 |
49145216 |
Installation of Tubewell with platfrom and soakpit at sansad seven |
69374 |
Installation of Tubewell with platfrom and soakpit at sansad seven1 |
Completion of work |
-
latitude : 23.289731265977025
Longitude : 88.27246922068298
file name : Image_11032022125435516.png
|
2022-03-11 12:54:35.633899 |
81 |
49145087 |
installation of tubewell with platfrom and sakpit at sansad five |
69374 |
installation of tubewell with platfrom and sakpit at sansad five1 |
Completion of work |
-
latitude : 23.282434861175716
Longitude : 88.27012714929879
file name : Image_11032022125438763.png
|
2022-03-11 12:54:38.869609 |
82 |
49142463 |
Installation of tubewell with platfrom and soakpit at sansad three |
69374 |
Installation of tubewell with platfrom and soakpit at sansad three1 |
Completion of work |
-
latitude : 23.282160689122975
Longitude : 88.2540927361697
file name : Image_11032022125419483.png
|
2022-03-11 12:54:19.60581 |
83 |
49145639 |
Installation of tubewell with platfrom and soakpit at sansad twelve |
69374 |
Installation of tubewell with platfrom and soakpit at sansad twelve1 |
Completion of work |
-
latitude : 23.26793873682618
Longitude : 88.25831713154912
file name : Image_11032022152309455.png
|
2022-03-11 15:23:09.560734 |
84 |
49145172 |
Installation of Tubewell with platfrom and soakpit at sansad six |
69374 |
Installation of Tubewell with platfrom and soakpit at sansad six1 |
Completion of work |
-
latitude : 23.282145727425814
Longitude : 88.25736687518656
file name : Image_11032022125422639.png
|
2022-03-11 12:54:22.752463 |
85 |
39103674 |
INSTALLATION OF TUBEWELL WITH PLATFROM AND SOKEPIT AT SIMLON VILLAGE |
69374 |
INSTALLATION OF TUBEWELL WITH PLATFROM AND SOKEPIT AT SIMLON VILLAGE1 |
Completion of work |
-
latitude : 23.266137465834618
Longitude : 88.25214394368231
file name : Image_12032022175248586.png
|
2022-03-12 17:52:48.690705 |
86 |
49142399 |
Installation of Tubewell with platfrom and soakpit at sansad no two |
135205 |
Installation of Tubewell with platfrom and soakpit at sansad no two1 |
Completion of work |
-
latitude : 23.2638270361349
Longitude : 88.24962761253119
file name : Image_26032022093901438.png
|
2022-03-26 09:39:01.578694 |
87 |
49113341 |
Construction of Concrete road from simlon buro bairagya house to kalitala |
467476 |
Construction of Concrete road from simlon buro bairagya house to kalitala1 |
Roof laid |
-
latitude : 23.267437205649912,23.267448437400162
Longitude : 88.25240663252771,88.25239774771035
file name : Image_13042022132103595.png
|
2022-04-13 13:21:03.680962 |
88 |
49113341 |
Construction of Concrete road from simlon buro bairagya house to kalitala |
467476 |
Construction of Concrete road from simlon buro bairagya house to kalitala1 |
Plinth level |
-
latitude : 23.26739261392504,23.26739261392504
Longitude : 88.25246220454574,88.25246220454574
file name : Image_12042022115321536.png
|
2022-04-12 11:53:21.738421 |
89 |
49113341 |
Construction of Concrete road from simlon buro bairagya house to kalitala |
467476 |
Construction of Concrete road from simlon buro bairagya house to kalitala1 |
Completion of work |
-
latitude : 23.267721058800817,23.267721058800817
Longitude : 88.25196633115411,88.25197513215244
file name : Image_24032022113123721.png
|
2022-03-24 11:31:23.819788 |
90 |
39103317 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Madhupur |
135205 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Madhupur1 |
Completion of work |
-
latitude : 23.2818599
Longitude : 88.2571974
file name : Image_10032022143434240.png
|
2022-03-10 14:34:34.341112 |
91 |
39106394 |
CONSTRUCTION OF CONCRETE ROAD FROM SURJAPUR CLUB TO BABULAL MANDI HOUSE |
349358 |
CONSTRUCTION OF CONCRETE ROAD FROM SURJAPUR CLUB TO BABULAL MANDI HOUSE1 |
Plinth level |
-
latitude : 23.260516435839236,23.260516435839236
Longitude : 88.27710709534585,88.27710709534585
file name : Image_13042022132137406.png
|
2022-04-13 13:21:37.496207 |
92 |
39106394 |
CONSTRUCTION OF CONCRETE ROAD FROM SURJAPUR CLUB TO BABULAL MANDI HOUSE |
349358 |
CONSTRUCTION OF CONCRETE ROAD FROM SURJAPUR CLUB TO BABULAL MANDI HOUSE1 |
Completion of work |
-
latitude : 23.260505204088986,23.260505204088986
Longitude : 88.27717616222799,88.27717616222799
file name : Image_06012022145037828.png
|
2022-01-06 14:50:37.930331 |
93 |
39105893 |
CONSTRUCTION OF CONCRETE ROAD FROM SUVAS SANGA CLUB TO GOBINDA PANDIT HOUSE |
707867 |
CONSTRUCTION OF CONCRETE ROAD FROM SUVAS SANGA CLUB TO GOBINDA PANDIT HOUSE1 |
Plinth level |
-
latitude : 23.276599631644785,23.276599631644785
Longitude : 88.27335669659078,88.27335669659078
file name : Image_13042022132123575.png
|
2022-04-13 13:21:23.670256 |
94 |
39105893 |
CONSTRUCTION OF CONCRETE ROAD FROM SUVAS SANGA CLUB TO GOBINDA PANDIT HOUSE |
707867 |
CONSTRUCTION OF CONCRETE ROAD FROM SUVAS SANGA CLUB TO GOBINDA PANDIT HOUSE1 |
Completion of work |
-
latitude : 23.276782692410052,23.276782692410052
Longitude : 88.27357613481581,88.27357613481581
file name : Image_06012022145034754.png
|
2022-01-06 14:50:34.873149 |
95 |
39103430 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Sarghoria |
136001 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Sarghoria1 |
Plinth level |
-
latitude : 23.27896219678223
Longitude : 88.28630589880049
file name : Image_13042022132147734.png
|
2022-04-13 13:21:47.8269 |
96 |
39103430 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Sarghoria |
136001 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Sarghoria1 |
Completion of work |
-
latitude : 23.278880221769214
Longitude : 88.28620908781886
file name : Image_20122021135755309.png
|
2021-12-20 13:57:55.427275 |
97 |
39105866 |
CONSTRUCTION OF CONCRETE ROAD FROM DHARENDRANATH MALLICK HOUSE TO CHAYA GHOSAL HOUSE |
497285 |
CONSTRUCTION OF CONCRETE ROAD FROM DHARENDRANATH MALLICK HOUSE TO CHAYA GHOSAL HOUSE1 |
Plinth level |
-
latitude : 23.278684420511127,23.278684420511127
Longitude : 88.29188548028469,88.29188548028469
file name : Image_13042022132140574.png
|
2022-04-13 13:21:40.658892 |
98 |
39105866 |
CONSTRUCTION OF CONCRETE ROAD FROM DHARENDRANATH MALLICK HOUSE TO CHAYA GHOSAL HOUSE |
497285 |
CONSTRUCTION OF CONCRETE ROAD FROM DHARENDRANATH MALLICK HOUSE TO CHAYA GHOSAL HOUSE1 |
Completion of work |
-
latitude : 23.278789864853024,23.278789864853024
Longitude : 88.29187408089638,88.29187408089638
file name : Image_20122021135758544.png
|
2021-12-20 13:57:58.685804 |
99 |
39105563 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Atghoria |
136001 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Atghoria1 |
Plinth level |
-
latitude : 23.275548540987074
Longitude : 88.27607595361769
file name : Image_13042022132150964.png
|
2022-04-13 13:21:51.04937 |
100 |
39105563 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Atghoria |
136001 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at Atghoria1 |
Completion of work |
-
latitude : 23.27549355570227
Longitude : 88.27603597193956
file name : Image_20122021135751760.png
|
2021-12-20 13:57:51.888994 |
101 |
49130743 |
Construction of Culvert at Atghoria Paschim Math drain |
169222 |
Construction of Culvert at Atghoria Paschim Math drain1 |
Plinth level |
-
latitude : 23.26524215284735,23.26527836266905
Longitude : 88.26819880865514,88.26821892522275
file name : Image_13042022132126894.png
|
2022-04-13 13:21:26.991789 |
102 |
49130743 |
Construction of Culvert at Atghoria Paschim Math drain |
169222 |
Construction of Culvert at Atghoria Paschim Math drain1 |
Completion of work |
-
latitude : 23.265237961895764,23.265237961895764
Longitude : 88.26816863380373,88.26816863380373
file name : Image_06042022124342362.png
|
2022-04-06 12:43:42.484592 |
103 |
49120767 |
Construction of bathing ghat at Bridhapara kotal Pukur |
110000 |
Construction of bathing ghat at Bridhapara kotal Pukur1 |
Completion of work |
-
latitude : 23.283930318430066
Longitude : 88.26895938254893
file name : Image_13042022132117081.png
|
2022-04-13 13:21:17.18559 |
104 |
39075873 |
LADIES TOILET AT GP OFFICE |
350000 |
LADIES TOILET AT GP OFFICE1 |
Completion of work |
-
latitude : 23.2818372
Longitude : 88.2571786
file name : Image_22042022170824019.png
|
2022-04-22 17:08:24.104331 |
105 |
49115771 |
Construction of Concrete road from sondalpur subir mondal house to durga mondir |
379381 |
Construction of Concrete road from sondalpur subir mondal house to durga mondir1 |
Completion of work |
-
latitude : 23.27327075880021,23.273270926438272
Longitude : 88.29134761355817,88.2913476973772
file name : Image_13042022132144392.png
|
2022-04-13 13:21:44.483415 |
106 |
49156139 |
Reparing of Tubewell |
350000 |
Reparing of Tubewell1 |
Completion of work |
-
latitude : 23.281847
Longitude : 88.2571606
file name : Image_14052022124447668.png
|
2022-05-14 12:44:47.768815 |
107 |
49115996 |
Construction of Concrete road from Krishnapur Amar Karmokar house to Susanta Sen House |
280604 |
Construction of Concrete road from Krishnapur Amar Karmokar house to Susanta Sen House1 |
Roof laid |
-
latitude : 23.2780591,23.2780591
Longitude : 88.2924853,88.2924853
file name : Image_19052022125130090.png
|
2022-05-19 12:51:30.203599 |
108 |
49115996 |
Construction of Concrete road from Krishnapur Amar Karmokar house to Susanta Sen House |
280604 |
Construction of Concrete road from Krishnapur Amar Karmokar house to Susanta Sen House1 |
Plinth level |
-
latitude : 23.278308492153883,23.278308492153883
Longitude : 88.29239803366363,88.29239803366363
file name : Image_12052022162538079.png
|
2022-05-12 16:25:38.174998 |
109 |
49115996 |
Construction of Concrete road from Krishnapur Amar Karmokar house to Susanta Sen House |
280604 |
Construction of Concrete road from Krishnapur Amar Karmokar house to Susanta Sen House1 |
Completion of work |
-
latitude : 23.278324459679425,23.278324459679425
Longitude : 88.2923908252269,88.2923908252269
file name : Image_12052022162215330.png
|
2022-05-12 16:22:15.437234 |
110 |
39076214 |
CONSTRUCTION OF PUCCA DRAIN SARROUNDING DRAIN SYSTEM AT GP OFFICE |
222797 |
CONSTRUCTION OF PUCCA DRAIN SARROUNDING DRAIN SYSTEM AT GP OFFICE1 |
Plinth level |
-
latitude : 23.28183597419411
Longitude : 88.25700678862631
file name : Image_12042022143803536.png
|
2022-04-12 14:38:03.641159 |
111 |
39076214 |
CONSTRUCTION OF PUCCA DRAIN SARROUNDING DRAIN SYSTEM AT GP OFFICE |
222797 |
CONSTRUCTION OF PUCCA DRAIN SARROUNDING DRAIN SYSTEM AT GP OFFICE1 |
Completion of work |
-
latitude : 23.281777468509972
Longitude : 88.2570751849562
file name : Image_06042022124346562.png
|
2022-04-06 12:43:46.667365 |
112 |
49142231 |
Construction of pucca drain from briddhapara naku babu house char bigha land |
349732 |
Construction of pucca drain from briddhapara naku babu house char bigha land1 |
Plinth level |
-
latitude : 23.28454014379531
Longitude : 88.26515827327967
file name : Image_20062022141239834.png
|
2022-06-20 14:12:39.936663 |
113 |
49142231 |
Construction of pucca drain from briddhapara naku babu house char bigha land |
349732 |
Construction of pucca drain from briddhapara naku babu house char bigha land1 |
Completion of work |
-
latitude : 23.284485368058085
Longitude : 88.26511099934578
file name : Image_20062022140550179.png
|
2022-06-20 14:05:50.276648 |
114 |
49140808 |
Construction of Pucca Drain from Moslemabad morful sk house to hesamul sk house |
348935 |
Construction of Pucca Drain from Moslemabad morful sk house to hesamul sk house1 |
Plinth level |
-
latitude : 23.294633296318352,23.294633296318352
Longitude : 88.27429790049791,88.27429790049791
file name : Image_11072022145855636.png
|
2022-07-11 14:58:55.758889 |
115 |
49140808 |
Construction of Pucca Drain from Moslemabad morful sk house to hesamul sk house |
348935 |
Construction of Pucca Drain from Moslemabad morful sk house to hesamul sk house1 |
Completion of work |
-
latitude : 23.294647713191807,23.294647713191807
Longitude : 88.27423780225217,88.27423780225217
file name : Image_11072022145359690.png
|
2022-07-11 14:53:59.81634 |
116 |
69900923 |
Construction of roads |
300474 |
Construction of roads1 |
Plinth level |
-
latitude : 23.28599581,23.28599742
Longitude : 88.27607758,88.27607753
file name : Image_05042024123140833.png
|
2024-04-05 12:31:40.938386 |
117 |
69900923 |
Construction of roads |
300474 |
Construction of roads1 |
Completion of work |
-
latitude : 23.2841116,23.2841116
Longitude : 88.2699936,88.2699936
file name : Image_05042024122733115.png
|
2024-04-05 12:27:33.21333 |
118 |
49146190 |
Purchase of Tubewll materials and maintance at different gram sansad |
354932 |
Purchase of Tubewll materials and maintance at different gram sansad1 |
Plinth level |
-
latitude : 23.2818937
Longitude : 88.2571927
file name : Image_09092022122755468.png
|
2022-09-09 12:27:55.587775 |
119 |
49146190 |
Purchase of Tubewll materials and maintance at different gram sansad |
354932 |
Purchase of Tubewll materials and maintance at different gram sansad1 |
Completion of work |
-
latitude : 23.2818693
Longitude : 88.2572189
file name : Image_09092022122449731.png
|
2022-09-09 12:24:49.850388 |
120 |
49119972 |
Construction of Concrete road from briddhapara main road to mahadeb majhi house |
289430 |
Construction of Concrete road from briddhapara main road to mahadeb majhi house1 |
Plinth level |
-
latitude : 23.28846915,23.28846915
Longitude : 88.27205345,88.27205345
file name : Image_09122022145702747.png
|
2022-12-09 14:57:02.864235 |
121 |
49119972 |
Construction of Concrete road from briddhapara main road to mahadeb majhi house |
289430 |
Construction of Concrete road from briddhapara main road to mahadeb majhi house1 |
Completion of work |
-
latitude : 23.28846467,23.28846544
Longitude : 88.27204232,88.27204203
file name : Image_09122022145405263.png
|
2022-12-09 14:54:05.380342 |
122 |
49115008 |
Construction of Concrete road from moslemabad main road to ansur sk house |
92752 |
Construction of Concrete road from moslemabad main road to ansur sk house1 |
Plinth level |
-
latitude : 23.29493314,23.29493314
Longitude : 88.2738011,88.2738011
file name : Image_09122022144727255.png
|
2022-12-09 14:47:27.363475 |
123 |
49115008 |
Construction of Concrete road from moslemabad main road to ansur sk house |
92752 |
Construction of Concrete road from moslemabad main road to ansur sk house1 |
Completion of work |
-
latitude : 23.29493758,23.29493758
Longitude : 88.27380493,88.27380493
file name : Image_09122022144433860.png
|
2022-12-09 14:44:33.970578 |
124 |
49119478 |
Construction of Concrete road from Sankati kausar sk house to main road |
37099 |
Construction of Concrete road from Sankati kausar sk house to main road1 |
Plinth level |
-
latitude : 23.29769885,23.29769885
Longitude : 88.27123029,88.27123036
file name : Image_09122022144045020.png
|
2022-12-09 14:40:45.121917 |
125 |
49119478 |
Construction of Concrete road from Sankati kausar sk house to main road |
37099 |
Construction of Concrete road from Sankati kausar sk house to main road1 |
Completion of work |
-
latitude : 23.2976803,23.2976803
Longitude : 88.27123211,88.27123211
file name : Image_09122022143757485.png
|
2022-12-09 14:37:57.582727 |
126 |
49113548 |
Construction of Concrete road from simlon soumen bhatterjee house to main road |
423931 |
Construction of Concrete road from simlon soumen bhatterjee house to main road1 |
Roof laid |
-
latitude : 23.26876305,23.26876305
Longitude : 88.25552828,88.25552828
file name : Image_09122022141221156.png
|
2022-12-09 14:12:21.248247 |
127 |
49113548 |
Construction of Concrete road from simlon soumen bhatterjee house to main road |
423931 |
Construction of Concrete road from simlon soumen bhatterjee house to main road1 |
Plinth level |
-
latitude : 23.26875753,23.26875753
Longitude : 88.25552708,88.25552714
file name : Image_09122022140925995.png
|
2022-12-09 14:09:26.082589 |
128 |
49113548 |
Construction of Concrete road from simlon soumen bhatterjee house to main road |
423931 |
Construction of Concrete road from simlon soumen bhatterjee house to main road1 |
Completion of work |
-
latitude : 23.269878141582012,23.269878141582012
Longitude : 88.25583063997328,88.25583063997328
file name : Image_28102022151519894.png
|
2022-10-28 15:15:20.016705 |
129 |
49126546 |
Construction of concrete road from sankati Ansur mondal house to main road |
62151 |
Construction of concrete road from sankati Ansur mondal house to main road1 |
Roof laid |
-
latitude : 23.29537173,23.29537173
Longitude : 88.26507281,88.26507281
file name : Image_09122022143153737.png
|
2022-12-09 14:31:53.83194 |
130 |
49126546 |
Construction of concrete road from sankati Ansur mondal house to main road |
62151 |
Construction of concrete road from sankati Ansur mondal house to main road1 |
Plinth level |
-
latitude : 23.29538106,23.29538106
Longitude : 88.26511969,88.26511969
file name : Image_09122022142838673.png
|
2022-12-09 14:28:38.764642 |
131 |
49131116 |
Construction of Pucca drain from Aymapara fagu Murmu house to Kalitala |
189398 |
Construction of Pucca drain from Aymapara fagu Murmu house to Kalitala1 |
Plinth level |
-
latitude : 23.2846379,23.2846379
Longitude : 88.246649,88.246649
file name : Image_10062022154111056.png
|
2022-06-10 15:41:11.154888 |
132 |
49131116 |
Construction of Pucca drain from Aymapara fagu Murmu house to Kalitala |
189398 |
Construction of Pucca drain from Aymapara fagu Murmu house to Kalitala1 |
Completion of work |
-
latitude : 23.2846355,23.2846355
Longitude : 88.2466483,88.2466483
file name : Image_10062022153255432.png
|
2022-06-10 15:32:55.525613 |
133 |
49140881 |
Construction of Pucca Drain from Surjapur Ismail mondal house to Bhager pukur |
86880 |
Construction of Pucca Drain from Surjapur Ismail mondal house to Bhager pukur1 |
Plinth level |
-
latitude : 23.26185425,23.26185425
Longitude : 88.27796015,88.27796015
file name : Image_09012023134243179.png
|
2023-01-09 13:42:43.289761 |
134 |
49140881 |
Construction of Pucca Drain from Surjapur Ismail mondal house to Bhager pukur |
86880 |
Construction of Pucca Drain from Surjapur Ismail mondal house to Bhager pukur1 |
Completion of work |
-
latitude : 23.26185922,23.26185588
Longitude : 88.27784524,88.27784785
file name : Image_09012023133335399.png
|
2023-01-09 13:33:35.50693 |
135 |
49140963 |
Construction of Pucca drain from Krishnapur gonesh Das house to Buno Pukur Par |
86386 |
Construction of Pucca drain from Krishnapur gonesh Das house to Buno Pukur Par1 |
Plinth level |
-
latitude : 23.27877911,23.27877911
Longitude : 88.29295921,88.29295921
file name : Image_09012023132422551.png
|
2023-01-09 13:24:22.666254 |
136 |
49140963 |
Construction of Pucca drain from Krishnapur gonesh Das house to Buno Pukur Par |
86386 |
Construction of Pucca drain from Krishnapur gonesh Das house to Buno Pukur Par1 |
Completion of work |
-
latitude : 23.27877267,23.27877267
Longitude : 88.29295265,88.29295265
file name : Image_09012023131818004.png
|
2023-01-09 13:18:18.106518 |
137 |
49130390 |
Construction of Pucca drain from Madhupur kartick Durlav sen house to joka pukur |
50852 |
Construction of Pucca drain from Madhupur kartick Durlav sen house to joka pukur1 |
Plinth level |
-
latitude : 23.2786361,23.2786361
Longitude : 88.25932791,88.25932791
file name : Image_09012023140836867.png
|
2023-01-09 14:08:36.947016 |
138 |
49130390 |
Construction of Pucca drain from Madhupur kartick Durlav sen house to joka pukur |
50852 |
Construction of Pucca drain from Madhupur kartick Durlav sen house to joka pukur1 |
Completion of work |
-
latitude : 23.27865893,23.27865893
Longitude : 88.25932125,88.25932125
file name : Image_09012023140441767.png
|
2023-01-09 14:04:41.858804 |
139 |
49115478 |
Construction of concrete road from surjapur narayan murmu house to primary school |
407202 |
Construction of concrete road from surjapur narayan murmu house to primary school1 |
Plinth level |
-
latitude : 23.26567328,23.26567328
Longitude : 88.27894383,88.27894383
file name : Image_09122022151318959.png
|
2022-12-09 15:13:19.062181 |
140 |
49115478 |
Construction of concrete road from surjapur narayan murmu house to primary school |
407202 |
Construction of concrete road from surjapur narayan murmu house to primary school1 |
Completion of work |
-
latitude : 23.26567302,23.26567302
Longitude : 88.27893852,88.27893852
file name : Image_09122022151011371.png
|
2022-12-09 15:10:11.468219 |
141 |
49131418 |
Construction of Pucca drain fromSimlon Joy das house to Kalkitala |
218393 |
Construction of Pucca drain fromSimlon Joy das house to Kalkitala1 |
Plinth level |
-
latitude : 23.27245133,23.27245133
Longitude : 88.25844479,88.25844479
file name : Image_09012023140010332.png
|
2023-01-09 14:00:10.45029 |
142 |
49131418 |
Construction of Pucca drain fromSimlon Joy das house to Kalkitala |
218393 |
Construction of Pucca drain fromSimlon Joy das house to Kalkitala1 |
Completion of work |
-
latitude : 23.27247558,23.27247558
Longitude : 88.2584208,88.2584208
file name : Image_09012023135627655.png
|
2023-01-09 13:56:27.774056 |
143 |
49146138 |
Water ATM at Madhupur Market |
150000 |
Water ATM at Madhupur Market1 |
Completion of work |
-
latitude : 23.2818599
Longitude : 88.2571883
file name : Image_24012023132336962.png
|
2023-01-24 13:23:37.061834 |
144 |
39106467 |
CONSTRUCTION OF CONCRETE ROAD FROM FAGU MURMU HOUSE TO KALITALA |
950000 |
CONSTRUCTION OF CONCRETE ROAD FROM FAGU MURMU HOUSE TO KALITALA1 |
Roof laid |
-
latitude : 23.28491653315723,23.284904127940536
Longitude : 88.24536331929266,88.24526407755911
file name : Image_12022021124210883.png
|
2021-02-12 12:42:11.00076 |
145 |
39106467 |
CONSTRUCTION OF CONCRETE ROAD FROM FAGU MURMU HOUSE TO KALITALA |
950000 |
CONSTRUCTION OF CONCRETE ROAD FROM FAGU MURMU HOUSE TO KALITALA1 |
Plinth level |
-
latitude : 23.28445163089782,23.284484362229705
Longitude : 88.24578903615475,88.24576095677912
file name : Image_08022021145925154.png
|
2021-02-08 14:59:25.266098 |
146 |
39106467 |
CONSTRUCTION OF CONCRETE ROAD FROM FAGU MURMU HOUSE TO KALITALA |
950000 |
CONSTRUCTION OF CONCRETE ROAD FROM FAGU MURMU HOUSE TO KALITALA1 |
Completion of work |
-
latitude : 23.284441069699824,23.284438513219357
Longitude : 88.24584946967661,88.24582298286259
file name : Image_05022021152831865.png
|
2021-02-05 15:28:31.956029 |
147 |
65241050 |
REPAIRING OF ROAD FROM SARGHORIA METAL ROAD TO MOSLEMABAD HIGH MADRASA |
365991 |
REPAIRING OF ROAD FROM SARGHORIA METAL ROAD TO MOSLEMABAD HIGH MADRASA1 |
Plinth level |
-
latitude : 23.29252766,23.29252766
Longitude : 88.2765542,88.2765542
file name : Image_02032023140835822.png
|
2023-03-02 14:08:35.937725 |
148 |
65241050 |
REPAIRING OF ROAD FROM SARGHORIA METAL ROAD TO MOSLEMABAD HIGH MADRASA |
365991 |
REPAIRING OF ROAD FROM SARGHORIA METAL ROAD TO MOSLEMABAD HIGH MADRASA1 |
Completion of work |
-
latitude : 23.2931113,23.2931113
Longitude : 88.2754197,88.2754197
file name : Image_02032023140248275.png
|
2023-03-02 14:02:48.387105 |
149 |
58534241 |
OFFICE INFRASTRUCTURE DEVLOPMENT |
140000 |
OFFICE INFRASTRUCTURE DEVLOPMENT1 |
Completion of work |
-
latitude : 23.2818033
Longitude : 88.2572374
file name : Image_09032023163804100.png
|
2023-03-09 16:38:04.196841 |
150 |
49142045 |
Construction of Pucca drain from Guptipur Battala to Bakultal |
349103 |
Construction of Pucca drain from Guptipur Battala to Bakultal1 |
Plinth level |
-
latitude : 23.28475043
Longitude : 88.24542649
file name : Image_16032023141733473.png
|
2023-03-16 14:17:33.561969 |
151 |
49142045 |
Construction of Pucca drain from Guptipur Battala to Bakultal |
349103 |
Construction of Pucca drain from Guptipur Battala to Bakultal1 |
Completion of work |
-
latitude : 23.28473045
Longitude : 88.24548514
file name : Image_16032023141348848.png
|
2023-03-16 14:13:48.938274 |
152 |
49142045 |
Construction of Pucca drain from Guptipur Battala to Bakultal |
349103 |
Construction of Pucca drain from Guptipur Battala to Bakultal1 |
Completion of work |
-
latitude : 23.2846141
Longitude : 88.24666
file name : Image_02032023142200355.png
|
2023-03-02 14:22:00.456668 |
153 |
49140554 |
Construction of Pucca drain from Simlon Sishu Sikha Kendra to Radha Malik |
231672 |
Construction of Pucca drain from Simlon Sishu Sikha Kendra to Radha Malik 1 |
Plinth level |
-
latitude : 23.26447672,23.26447674
Longitude : 88.24945618,88.24945615
file name : Image_16032023143152272.png
|
2023-03-16 14:31:52.360627 |
154 |
49140554 |
Construction of Pucca drain from Simlon Sishu Sikha Kendra to Radha Malik |
231672 |
Construction of Pucca drain from Simlon Sishu Sikha Kendra to Radha Malik 1 |
Completion of work |
-
latitude : 23.26443116,23.26443243
Longitude : 88.24947509,88.24947576
file name : Image_16032023142830755.png
|
2023-03-16 14:28:30.850889 |
155 |
58379352 |
Concrete road from Machlandapur Manab Hazra house to dhiren ghosh house |
298219 |
Concrete road from Machlandapur Manab Hazra house to dhiren ghosh house1 |
Completion of work |
-
latitude : 23.29224021,23.2922389
Longitude : 88.31842935,88.31842991
file name : Image_07042023160157754.png
|
2023-04-07 16:01:57.889185 |
156 |
58387793 |
Construction of Conrete Road from Sankati Dhalai road to Iyajut Mondal house |
60134 |
Construction of Conrete Road from Sankati Dhalai road to Iyajut Mondal house1 |
Plinth level |
-
latitude : 23.29534993,23.29534993
Longitude : 88.26483927,88.26483927
file name : Image_30032023134014029.png
|
2023-03-30 13:40:14.126264 |
157 |
58387793 |
Construction of Conrete Road from Sankati Dhalai road to Iyajut Mondal house |
60134 |
Construction of Conrete Road from Sankati Dhalai road to Iyajut Mondal house1 |
Completion of work |
-
latitude : 23.29537555,23.29537555
Longitude : 88.26484148,88.26484148
file name : Image_30032023133646352.png
|
2023-03-30 13:36:46.452756 |
158 |
66434959 |
Construction of Concrete Road with 2 non Culvert From Main road to House of Anita Sardar at Simlon |
349959 |
Construction of Concrete Road with 2 non Culvert From Main road to House of Anita Sardar at Simlon1 |
Plinth level |
-
latitude : 23.2818318,23.2818318
Longitude : 88.2572379,88.2572379
file name : Image_30032023131927116.png
|
2023-03-30 13:19:27.210244 |
159 |
66434959 |
Construction of Concrete Road with 2 non Culvert From Main road to House of Anita Sardar at Simlon |
349959 |
Construction of Concrete Road with 2 non Culvert From Main road to House of Anita Sardar at Simlon1 |
Completion of work |
-
latitude : 23.2818318,23.2818318
Longitude : 88.2572379,88.2572379
file name : Image_30032023131320586.png
|
2023-03-30 13:13:20.684842 |
160 |
58385277 |
Construction of Conrete Road from Sankati Pucca road to Mujanur Rahaman sk house |
58776 |
Construction of Conrete Road from Sankati Pucca road to Mujanur Rahaman sk house1 |
Plinth level |
-
latitude : 23.29655733,23.29655733
Longitude : 88.26464356,88.26464356
file name : Image_30032023135002676.png
|
2023-03-30 13:50:02.782848 |
161 |
58385277 |
Construction of Conrete Road from Sankati Pucca road to Mujanur Rahaman sk house |
58776 |
Construction of Conrete Road from Sankati Pucca road to Mujanur Rahaman sk house1 |
Completion of work |
-
latitude : 23.29656629,23.29656629
Longitude : 88.26468844,88.26468844
file name : Image_30032023134730878.png
|
2023-03-30 13:47:30.968697 |
162 |
58588566 |
Reparing and Matintence of Tubewell at different gram Sansad No one to nine |
270000 |
Reparing and Matintence of Tubewell at different gram Sansad No one to nine1 |
Completion of work |
-
latitude : 23.2819431
Longitude : 88.2587981
file name : Image_12042023144426138.png
|
2023-04-12 14:44:26.224886 |
163 |
58588566 |
Reparing and Matintence of Tubewell at different gram Sansad No one to nine |
270000 |
Reparing and Matintence of Tubewell at different gram Sansad No one to nine1 |
Completion of work |
-
latitude : 23.2817558
Longitude : 88.2572161
file name : Image_12042023144429211.png
|
2023-04-12 14:44:29.304093 |
164 |
58588566 |
Reparing and Matintence of Tubewell at different gram Sansad No one to nine |
270000 |
Reparing and Matintence of Tubewell at different gram Sansad No one to nine1 |
Completion of work |
-
latitude : 23.2817558
Longitude : 88.2572161
file name : Image_12042023144433680.png
|
2023-04-12 14:44:33.766646 |
165 |
58559366 |
Construction of Submersible Mini at Dakhinpara Bakultala Kalitala |
160000 |
Construction of Submersible Mini at Dakhinpara Bakultala Kalitala1 |
Completion of work |
-
latitude : 23.28551594
Longitude : 88.24339414
file name : Image_12042023154552627.png
|
2023-04-12 15:45:52.738547 |
166 |
58577496 |
Construction of Mini at Moura par |
160000 |
Construction of Mini at Moura par1 |
Completion of work |
-
latitude : 23.2831925
Longitude : 88.24700784
file name : Image_12042023161255123.png
|
2023-04-12 16:12:55.219171 |
167 |
58614651 |
Construction of Pucca Drain from Amal Das house towards Nadi |
289601 |
Construction of Pucca Drain from Amal Das house towards Nadi1 |
Plinth level |
-
latitude : 23.26448911,23.26448911
Longitude : 88.25243225,88.25243225
file name : Image_12052023152758323.png
|
2023-05-12 15:27:58.429579 |
168 |
58614651 |
Construction of Pucca Drain from Amal Das house towards Nadi |
289601 |
Construction of Pucca Drain from Amal Das house towards Nadi1 |
Completion of work |
-
latitude : 23.26449441,23.26449441
Longitude : 88.25243645,88.25243645
file name : Image_12052023152318953.png
|
2023-05-12 15:23:19.0565 |
169 |
58533777 |
COMPUTER MAINTANANCE OF GRAM PANCHYAT OFFICE AND NET BILL |
200000 |
COMPUTER MAINTANANCE OF GRAM PANCHYAT OFFICE AND NET BILL1 |
Completion of work |
-
latitude : 23.2818246
Longitude : 88.2571944
file name : Image_12052023155753691.png
|
2023-05-12 15:57:53.782306 |
170 |
58611876 |
Construction of Pucca Drain from Briddhapara Ga pukur to Kanai Doba |
200365 |
Construction of Pucca Drain from Briddhapara Ga pukur to Kanai Doba1 |
Plinth level |
-
latitude : 23.28385851,23.28385851
Longitude : 88.27114888,88.27114888
file name : Image_15052023134344023.png
|
2023-05-15 13:43:44.116943 |
171 |
58611876 |
Construction of Pucca Drain from Briddhapara Ga pukur to Kanai Doba |
200365 |
Construction of Pucca Drain from Briddhapara Ga pukur to Kanai Doba1 |
Completion of work |
-
latitude : 23.28390906,23.28389867
Longitude : 88.27114779,88.27114132
file name : Image_15052023134155271.png
|
2023-05-15 13:41:55.364418 |
172 |
39105446 |
CONSTRUCTION OF PUCCA DRAIN FROM UTTAM HOWLI HOUSE TO DHANANJOY MONDAL GOWAL BARI |
294327 |
CONSTRUCTION OF PUCCA DRAIN FROM UTTAM HOWLI HOUSE TO DHANANJOY MONDAL GOWAL BARI1 |
Roof laid |
-
latitude : 23.27940878458321,23.27940878458321
Longitude : 88.23835638351738,88.23835638351738
file name : Image_23102021114144560.png
|
2021-10-23 11:41:44.687831 |
173 |
39105446 |
CONSTRUCTION OF PUCCA DRAIN FROM UTTAM HOWLI HOUSE TO DHANANJOY MONDAL GOWAL BARI |
294327 |
CONSTRUCTION OF PUCCA DRAIN FROM UTTAM HOWLI HOUSE TO DHANANJOY MONDAL GOWAL BARI1 |
Plinth level |
-
latitude : 23.2802943745628,23.2802943745628
Longitude : 88.2387028913945,88.2387028913945
file name : Image_11092021103333107.png
|
2021-09-11 10:33:33.209987 |
174 |
39105446 |
CONSTRUCTION OF PUCCA DRAIN FROM UTTAM HOWLI HOUSE TO DHANANJOY MONDAL GOWAL BARI |
294327 |
CONSTRUCTION OF PUCCA DRAIN FROM UTTAM HOWLI HOUSE TO DHANANJOY MONDAL GOWAL BARI1 |
Completion of work |
-
latitude : 23.280292111448944,23.280292111448944
Longitude : 88.23873993940651,88.23873993940651
file name : Image_07092021130229465.png
|
2021-09-07 13:02:29.562068 |
175 |
49141039 |
Construction of Pucca Drain from Machhalandapur Bechu Cha dokan to parimal Sen house |
207149 |
Construction of Pucca Drain from Machhalandapur Bechu Cha dokan to parimal Sen house1 |
Roof laid |
-
latitude : 23.27774133067578,23.277718028984964
Longitude : 88.24934992007911,88.24932142160833
file name : Image_30062022123140847.png
|
2022-06-30 12:31:40.962752 |
176 |
49141039 |
Construction of Pucca Drain from Machhalandapur Bechu Cha dokan to parimal Sen house |
207149 |
Construction of Pucca Drain from Machhalandapur Bechu Cha dokan to parimal Sen house1 |
Plinth level |
-
latitude : 23.277677921578288,23.277677921578288
Longitude : 88.2492917496711,88.2492917496711
file name : Image_13052022162857988.png
|
2022-05-13 16:28:58.076707 |
177 |
49141039 |
Construction of Pucca Drain from Machhalandapur Bechu Cha dokan to parimal Sen house |
207149 |
Construction of Pucca Drain from Machhalandapur Bechu Cha dokan to parimal Sen house1 |
Completion of work |
-
latitude : 23.2818264,23.2818264
Longitude : 88.2571976,88.2571976
file name : Image_13052022162516561.png
|
2022-05-13 16:25:16.675653 |
178 |
49141184 |
Construction of Pucca Drain from Sankati sukur Mallick house to Eidbox sk house |
252035 |
Construction of Pucca Drain from Sankati sukur Mallick house to Eidbox sk house1 |
Plinth level |
-
latitude : 23.295694403350353,23.295694403350353
Longitude : 88.26351567171514,88.26351567171514
file name : Image_13042022132113696.png
|
2022-04-13 13:21:13.792436 |
179 |
49141184 |
Construction of Pucca Drain from Sankati sukur Mallick house to Eidbox sk house |
252035 |
Construction of Pucca Drain from Sankati sukur Mallick house to Eidbox sk house1 |
Completion of work |
-
latitude : 23.29569909721613,23.29569909721613
Longitude : 88.26348717324436,88.26348717324436
file name : Image_12042022115331737.png
|
2022-04-12 11:53:31.866038 |
180 |
49110221 |
construction of Concrete road from Madhupur Prabir Durlav house to Amar malik Houe with drain |
171007 |
construction of Concrete road from Madhupur Prabir Durlav house to Amar malik Houe with drain1 |
Roof laid |
-
latitude : 23.27885122038424,23.27885122038424
Longitude : 88.25952219776809,88.25952219776809
file name : Image_12042022115328523.png
|
2022-04-12 11:53:28.635791 |
181 |
49110221 |
construction of Concrete road from Madhupur Prabir Durlav house to Amar malik Houe with drain |
171007 |
construction of Concrete road from Madhupur Prabir Durlav house to Amar malik Houe with drain1 |
Plinth level |
-
latitude : 23.278887723572552,23.27889199834317
Longitude : 88.25945279560983,88.25950677506626
file name : Image_28032022105753409.png
|
2022-03-28 10:57:53.53125 |
182 |
49110221 |
construction of Concrete road from Madhupur Prabir Durlav house to Amar malik Houe with drain |
171007 |
construction of Concrete road from Madhupur Prabir Durlav house to Amar malik Houe with drain1 |
Completion of work |
-
latitude : 23.27880943659693,23.27880943659693
Longitude : 88.25954088941216,88.25954088941216
file name : Image_24032022112455466.png
|
2022-03-24 11:24:55.564343 |
183 |
49130555 |
Construction of Pucca drain from Atghoria Sankar ghosh house to land |
349983 |
Construction of Pucca drain from Atghoria Sankar ghosh house to land1 |
Completion of work |
-
latitude : 23.278199108317494,23.278199108317494
Longitude : 88.27548922039568,88.27548922039568
file name : Image_07062022120324296.png
|
2022-06-07 12:03:24.398141 |
184 |
49140729 |
Construction of Pucca Drain from Moslemabad Purba Para Masjid to Sajjad Sk house |
349005 |
Construction of Pucca Drain from Moslemabad Purba Para Masjid to Sajjad Sk house1 |
Plinth level |
-
latitude : 23.29038241,23.29038241
Longitude : 88.27971182,88.27971182
file name : Image_31052023133559992.png
|
2023-05-31 13:36:00.078246 |
185 |
49140729 |
Construction of Pucca Drain from Moslemabad Purba Para Masjid to Sajjad Sk house |
349005 |
Construction of Pucca Drain from Moslemabad Purba Para Masjid to Sajjad Sk house1 |
Completion of work |
-
latitude : 23.29012587,23.29012948
Longitude : 88.2799356,88.27993953
file name : Image_31052023133142363.png
|
2023-05-31 13:31:42.458601 |
186 |
58612545 |
Construction of cover Drain from Dulal Majumder huouse to Ramesh Majumder house |
101757 |
Construction of cover Drain from Dulal Majumder huouse to Ramesh Majumder house1 |
Roof laid |
-
latitude : 23.27952882,23.27952882
Longitude : 88.258273,88.258273
file name : Image_05062023163727276.png
|
2023-06-05 16:37:27.368298 |
187 |
58612545 |
Construction of cover Drain from Dulal Majumder huouse to Ramesh Majumder house |
101757 |
Construction of cover Drain from Dulal Majumder huouse to Ramesh Majumder house1 |
Plinth level |
-
latitude : 23.2795078,23.2795078
Longitude : 88.2580301,88.2580301
file name : Image_12052023134027451.png
|
2023-05-12 13:40:27.552002 |
188 |
58612545 |
Construction of cover Drain from Dulal Majumder huouse to Ramesh Majumder house |
101757 |
Construction of cover Drain from Dulal Majumder huouse to Ramesh Majumder house1 |
Completion of work |
-
latitude : 23.28183711,23.28183711
Longitude : 88.25722838,88.25722838
file name : Image_12052023133544010.png
|
2023-05-12 13:35:44.109443 |
189 |
58613351 |
Construction of cover Drain from Sadhan Majumder huouse to Ramesh Majumder house |
150000 |
Construction of cover Drain from Sadhan Majumder huouse to Ramesh Majumder house1 |
Plinth level |
-
latitude : 23.2796858,23.27968581
Longitude : 88.25833306,88.25833306
file name : Image_05062023163552056.png
|
2023-06-05 16:35:52.14311 |
190 |
58613351 |
Construction of cover Drain from Sadhan Majumder huouse to Ramesh Majumder house |
150000 |
Construction of cover Drain from Sadhan Majumder huouse to Ramesh Majumder house1 |
Completion of work |
-
latitude : 23.2797058,23.27971136
Longitude : 88.25834686,88.25834713
file name : Image_05062023163351710.png
|
2023-06-05 16:33:51.798741 |
191 |
58582224 |
Construction of Community Toilet At Simlon Library |
311156 |
Construction of Community Toilet At Simlon Library1 |
Completion of work |
-
latitude : 23.26847647
Longitude : 88.2550487
file name : Image_07062023152630680.png
|
2023-06-07 15:26:30.768451 |
192 |
58522752 |
Construction of Conrete Road Simlon Concrete road from Kinkar Sen to Main Road |
200000 |
Construction of Conrete Road Simlon Concrete road from Kinkar Sen to Main Road1 |
Plinth level |
-
latitude : 23.264666,23.264666
Longitude : 88.25635762,88.25635762
file name : Image_16062023162525741.png
|
2023-06-16 16:25:25.82538 |
193 |
58522752 |
Construction of Conrete Road Simlon Concrete road from Kinkar Sen to Main Road |
200000 |
Construction of Conrete Road Simlon Concrete road from Kinkar Sen to Main Road1 |
Completion of work |
-
latitude : 23.26463329,23.26463329
Longitude : 88.2563741,88.2563741
file name : Image_16062023162155037.png
|
2023-06-16 16:21:55.122837 |
194 |
58578824 |
Installation of Tubewell with platform and soakpit at Sansad No fourteen and fifteen |
175000 |
Installation of Tubewell with platform and soakpit at Sansad No fourteen and fifteen 1 |
Plinth level |
-
latitude : 23.2762296
Longitude : 88.2925842
file name : Image_21062023132644524.png
|
2023-06-21 13:26:44.630214 |
195 |
58578824 |
Installation of Tubewell with platform and soakpit at Sansad No fourteen and fifteen |
175000 |
Installation of Tubewell with platform and soakpit at Sansad No fourteen and fifteen 1 |
Completion of work |
-
latitude : 23.28177563
Longitude : 88.25726528
file name : Image_21062023131932976.png
|
2023-06-21 13:19:33.078597 |
196 |
58523742 |
Construction of Bathing Ghat with changing room at Briddhapara Nandi Pukur |
214438 |
Construction of Bathing Ghat with changing room at Briddhapara Nandi Pukur 1 |
Plinth level |
-
latitude : 23.28572806
Longitude : 88.27798084
file name : Image_28062023140941512.png
|
2023-06-28 14:09:41.619555 |
197 |
58523742 |
Construction of Bathing Ghat with changing room at Briddhapara Nandi Pukur |
214438 |
Construction of Bathing Ghat with changing room at Briddhapara Nandi Pukur 1 |
Completion of work |
-
latitude : 23.28579916
Longitude : 88.27800448
file name : Image_28062023140605420.png
|
2023-06-28 14:06:05.512235 |
198 |
71059090 |
Construction of Bathing Ghat at Gowala Pukur Adbasipara at Simlon |
214438 |
Construction of Bathing Ghat at Gowala Pukur Adbasipara at Simlon1 |
Plinth level |
-
latitude : 23.26778193
Longitude : 88.2566119
file name : Image_18072023161021340.png
|
2023-07-18 16:10:21.458354 |
199 |
71059090 |
Construction of Bathing Ghat at Gowala Pukur Adbasipara at Simlon |
214438 |
Construction of Bathing Ghat at Gowala Pukur Adbasipara at Simlon1 |
Completion of work |
-
latitude : 23.26785261
Longitude : 88.25662833
file name : Image_18072023160001445.png
|
2023-07-18 16:00:01.565235 |
200 |
58592556 |
Water Testing |
200000 |
Water Testing1 |
Plinth level |
-
latitude : 23.29219862
Longitude : 88.31843857
file name : Image_24072023144452654.png
|
2023-07-24 14:44:52.780294 |
201 |
58592556 |
Water Testing |
200000 |
Water Testing1 |
Completion of work |
-
latitude : 23.29222487
Longitude : 88.31847768
file name : Image_24072023143342816.png
|
2023-07-24 14:33:42.906035 |
202 |
67347848 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.27579258
Longitude : 88.25248897
file name : Image_21072023164438369.png
|
2023-07-21 16:44:38.563545 |
203 |
67347848 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.27581503
Longitude : 88.25262315
file name : Image_21072023164151923.png
|
2023-07-21 16:41:52.015853 |
204 |
67347679 |
Construction of Community Sanitary Complex |
300000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.2963925
Longitude : 88.2647885
file name : Image_27072023135206663.png
|
2023-07-27 13:52:06.758272 |
205 |
67347679 |
Construction of Community Sanitary Complex |
300000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.2963951
Longitude : 88.2648086
file name : Image_27072023134405359.png
|
2023-07-27 13:44:05.521634 |
206 |
58524482 |
Construction of Conrete Road from Moslemabad Main road to Jakir Hossain sk house |
140000 |
Construction of Conrete Road from Moslemabad Main road to Jakir Hossain sk house1 |
Completion of work |
-
latitude : 23.2931479,23.2931485
Longitude : 88.2750961,88.2750999
file name : Image_28072023175259182.png
|
2023-07-28 17:52:59.270784 |
207 |
58624572 |
Updatation of Toilet at Machhalandapur ICDS Centre |
137351 |
Updatation of Toilet at Machhalandapur ICDS Centre1 |
Plinth level |
-
latitude : 23.2784821
Longitude : 88.2493357
file name : Image_25072023155541993.png
|
2023-07-25 15:55:42.116825 |
208 |
58624572 |
Updatation of Toilet at Machhalandapur ICDS Centre |
137351 |
Updatation of Toilet at Machhalandapur ICDS Centre1 |
Completion of work |
-
latitude : 23.2818945
Longitude : 88.2571806
file name : Image_25072023155301089.png
|
2023-07-25 15:53:01.190316 |
209 |
58578178 |
Installation of Tubewell with platform and soakpit at Sansad No nine and ten and eleven |
200000 |
Installation of Tubewell with platform and soakpit at Sansad No nine and ten and eleven1 |
Completion of work |
-
latitude : 23.26357318
Longitude : 88.24892296
file name : Image_07082023142214783.png
|
2023-08-07 14:22:14.878539 |
210 |
58618061 |
Construction of Pucca Drain from Sadhan Ruidas House to Dilip Das House |
210000 |
Construction of Pucca Drain from Sadhan Ruidas House to Dilip Das House1 |
Plinth level |
-
latitude : 23.26981281,23.26981281
Longitude : 88.29160547,88.29160547
file name : Image_09082023161427411.png
|
2023-08-09 16:14:27.522074 |
211 |
58618061 |
Construction of Pucca Drain from Sadhan Ruidas House to Dilip Das House |
210000 |
Construction of Pucca Drain from Sadhan Ruidas House to Dilip Das House1 |
Completion of work |
-
latitude : 23.2697094,23.2697094
Longitude : 88.2916627,88.2916627
file name : Image_09082023161237908.png
|
2023-08-09 16:12:38.022288 |
212 |
58591069 |
Reparing and Matintence of Tubewell at different gram Sansad No Ten to Eighteen |
240000 |
Reparing and Matintence of Tubewell at different gram Sansad No Ten to Eighteen 1 |
Completion of work |
-
latitude : 23.26361359
Longitude : 88.24887417
file name : Image_07082023143107741.png
|
2023-08-07 14:31:07.838502 |
213 |
70712947 |
Provision of Internet connection |
100000 |
Provision of Internet connection1 |
Completion of work |
-
latitude : 23.2818714
Longitude : 88.2572664
file name : Image_02092024143317709.png
|
2024-09-02 14:33:17.893838 |
214 |
70948995 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 23.27680541
Longitude : 88.2926256
file name : Image_11032024155423510.png
|
2024-03-11 15:54:23.601449 |
215 |
70948995 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 23.2765876
Longitude : 88.29346221
file name : Image_28112023172533208.png
|
2023-11-28 17:25:33.290021 |
216 |
70948995 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.27659002
Longitude : 88.29348675
file name : Image_28112023172253349.png
|
2023-11-28 17:22:53.431218 |
217 |
58373957 |
Construction of Road protection wall with UC Bolla at aymapara Main road |
222445 |
Construction of Road protection wall with UC Bolla at aymapara Main road1 |
Plinth level |
-
latitude : 23.28037204,23.28037203
Longitude : 88.23899399,88.23899397
file name : Image_19092023121001443.png
|
2023-09-19 12:10:01.541146 |
218 |
58373957 |
Construction of Road protection wall with UC Bolla at aymapara Main road |
222445 |
Construction of Road protection wall with UC Bolla at aymapara Main road1 |
Completion of work |
-
latitude : 23.28037531,23.28037531
Longitude : 88.23898427,88.23898427
file name : Image_19092023120058600.png
|
2023-09-19 12:00:58.697644 |
219 |
58398262 |
Construction of Boundary wall at Briddhapara ICDS |
233606 |
Construction of Boundary wall at Briddhapara ICDS1 |
Plinth level |
-
latitude : 23.27932553
Longitude : 88.2706546
file name : Image_19092023123413922.png
|
2023-09-19 12:34:14.025243 |
220 |
58398262 |
Construction of Boundary wall at Briddhapara ICDS |
233606 |
Construction of Boundary wall at Briddhapara ICDS1 |
Completion of work |
-
latitude : 23.27931595
Longitude : 88.27062564
file name : Image_19092023122246659.png
|
2023-09-19 12:22:46.742769 |
221 |
58398262 |
Construction of Boundary wall at Briddhapara ICDS |
233606 |
Construction of Boundary wall at Briddhapara ICDS1 |
Completion of work |
-
latitude : 23.27931181
Longitude : 88.2706267
file name : Image_19092023122242702.png
|
2023-09-19 12:22:42.792163 |
222 |
58398262 |
Construction of Boundary wall at Briddhapara ICDS |
233606 |
Construction of Boundary wall at Briddhapara ICDS1 |
Completion of work |
-
latitude : 23.27931307
Longitude : 88.27063015
file name : Image_19092023122238682.png
|
2023-09-19 12:22:38.76851 |
223 |
58399203 |
Construction and Upgradation of Briddhapara Upa Sastha Kendra |
286258 |
Construction and Upgradation of Briddhapara Upa Sastha Kendra1 |
Plinth level |
-
latitude : 23.28801055
Longitude : 88.27008082
file name : Image_16092023155703283.png
|
2023-09-16 15:57:03.369989 |
224 |
58399203 |
Construction and Upgradation of Briddhapara Upa Sastha Kendra |
286258 |
Construction and Upgradation of Briddhapara Upa Sastha Kendra1 |
Completion of work |
-
latitude : 23.28801468
Longitude : 88.27008304
file name : Image_16092023155259732.png
|
2023-09-16 15:52:59.830877 |
225 |
58618663 |
Construction of Pucca Drain from Pravat das House to Manasatala |
163296 |
Construction of Pucca Drain from Pravat das House to Manasatala1 |
Plinth level |
-
latitude : 23.27112158,23.27112158
Longitude : 88.29181575,88.29181575
file name : Image_16092023161719606.png
|
2023-09-16 16:17:19.693474 |
226 |
58618663 |
Construction of Pucca Drain from Pravat das House to Manasatala |
163296 |
Construction of Pucca Drain from Pravat das House to Manasatala1 |
Completion of work |
-
latitude : 23.27110966,23.27110966
Longitude : 88.29190731,88.29190731
file name : Image_16092023161154000.png
|
2023-09-16 16:11:54.086348 |
227 |
58628615 |
Updatation of Toilet at Briddhapara SANSAD SIX ICDS Centre |
100000 |
Updatation of Toilet at Briddhapara SANSAD SIX ICDS Centre1 |
Plinth level |
-
latitude : 23.28876212
Longitude : 88.27265119
file name : Image_06112023130900843.png
|
2023-11-06 13:09:01.442718 |
228 |
58628615 |
Updatation of Toilet at Briddhapara SANSAD SIX ICDS Centre |
100000 |
Updatation of Toilet at Briddhapara SANSAD SIX ICDS Centre1 |
Completion of work |
-
latitude : 23.28876851
Longitude : 88.27267022
file name : Image_06112023130503264.png
|
2023-11-06 13:05:05.041548 |
229 |
58616290 |
Construction of Toilet and Mini at simlon aymapara ICDS |
250000 |
Construction of Toilet and Mini at simlon aymapara ICDS1 |
Plinth level |
-
latitude : 23.26463668,23.26463676
Longitude : 88.24956305,88.2495631
file name : Image_03112023163750407.png
|
2023-11-03 16:37:50.50437 |
230 |
58616290 |
Construction of Toilet and Mini at simlon aymapara ICDS |
250000 |
Construction of Toilet and Mini at simlon aymapara ICDS1 |
Completion of work |
-
latitude : 23.26464688,23.26464688
Longitude : 88.24958201,88.24958201
file name : Image_03112023163308069.png
|
2023-11-03 16:33:08.172258 |
231 |
70826995 |
Greywater management system |
172071 |
Greywater management system1 |
Plinth level |
-
latitude : 23.28285019
Longitude : 88.25217121
file name : Image_17012024131632448.png
|
2024-01-17 13:16:32.525359 |
232 |
70826995 |
Greywater management system |
172071 |
Greywater management system1 |
Completion of work |
-
latitude : 23.28284582
Longitude : 88.252161
file name : Image_17012024131344595.png
|
2024-01-17 13:13:44.68054 |
233 |
70185589 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.2691601,23.2691601
Longitude : 88.2538822,88.2538822
file name : Image_17012024132822407.png
|
2024-01-17 13:28:22.492835 |
234 |
70185589 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.2691614,23.2691614
Longitude : 88.2538821,88.2538821
file name : Image_17012024132512110.png
|
2024-01-17 13:25:12.194399 |
235 |
70839501 |
Greywater management system |
346717 |
Greywater management system1 |
Plinth level |
-
latitude : 23.26734377
Longitude : 88.25778473
file name : Image_18042024155100421.png
|
2024-04-18 15:51:00.522372 |
236 |
70839501 |
Greywater management system |
346717 |
Greywater management system1 |
Completion of work |
-
latitude : 23.26732223
Longitude : 88.25798917
file name : Image_18042024154812171.png
|
2024-04-18 15:48:12.270397 |
237 |
70819065 |
Creation of drainage channel for management of grey water |
310402 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.2851395
Longitude : 88.2752052
file name : Image_18042024152237091.png
|
2024-04-18 15:22:37.188148 |
238 |
70819065 |
Creation of drainage channel for management of grey water |
310402 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.2851403
Longitude : 88.2752055
file name : Image_18042024152014554.png
|
2024-04-18 15:20:14.639878 |
239 |
70916446 |
Grey Water management- collection infrastructure |
220150 |
Grey Water management- collection infrastructure1 |
Roof laid |
-
latitude : 23.2779583
Longitude : 88.2916199
file name : Image_23092024140247067.png
|
2024-09-23 14:02:47.143581 |
240 |
70916446 |
Grey Water management- collection infrastructure |
220150 |
Grey Water management- collection infrastructure1 |
Plinth level |
-
latitude : 23.27773135
Longitude : 88.29178018
file name : Image_16012024163543189.png
|
2024-01-16 16:35:43.269086 |
241 |
70916446 |
Grey Water management- collection infrastructure |
220150 |
Grey Water management- collection infrastructure1 |
Completion of work |
-
latitude : 23.27774328
Longitude : 88.29173891
file name : Image_16012024163245228.png
|
2024-01-16 16:32:45.311206 |
242 |
58610254 |
Construction of Pucca Drain from Briddhapara Khaspukur to Debari pukur via Napit pukur |
227569 |
Construction of Pucca Drain from Briddhapara Khaspukur to Debari pukur via Napit pukur1 |
Plinth level |
-
latitude : 23.28486256,23.28486258
Longitude : 88.2690772,88.2690772
file name : Image_16012024132910806.png
|
2024-01-16 13:29:10.884091 |
243 |
58610254 |
Construction of Pucca Drain from Briddhapara Khaspukur to Debari pukur via Napit pukur |
227569 |
Construction of Pucca Drain from Briddhapara Khaspukur to Debari pukur via Napit pukur1 |
Completion of work |
-
latitude : 23.28190773,23.28190773
Longitude : 88.25723768,88.25723768
file name : Image_16012024132344618.png
|
2024-01-16 13:23:44.694184 |
244 |
70690347 |
Construction of roads |
142994 |
Construction of roads1 |
Plinth level |
-
latitude : 23.2750306,23.2750306
Longitude : 88.27465829,88.27465829
file name : Image_16012024152945812.png
|
2024-01-16 15:29:45.921584 |
245 |
70690347 |
Construction of roads |
142994 |
Construction of roads1 |
Completion of work |
-
latitude : 23.27502816,23.27502816
Longitude : 88.27463949,88.27463949
file name : Image_16012024152730644.png
|
2024-01-16 15:27:30.73241 |
246 |
70859183 |
Greywater management system |
174425 |
Greywater management system1 |
Plinth level |
-
latitude : 23.26308529
Longitude : 88.27825446
file name : Image_07022024123635781.png
|
2024-02-07 12:36:35.885929 |
247 |
70859183 |
Greywater management system |
174425 |
Greywater management system1 |
Completion of work |
-
latitude : 23.2630198
Longitude : 88.27824828
file name : Image_07022024123222269.png
|
2024-02-07 12:32:22.372669 |
248 |
70176680 |
Construction of roads |
210000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.28151963,23.28151963
Longitude : 88.25437211,88.25437211
file name : Image_07022024140721811.png
|
2024-02-07 14:07:21.912229 |
249 |
70176680 |
Construction of roads |
210000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.28152987,23.28153096
Longitude : 88.25439759,88.25439541
file name : Image_07022024140532679.png
|
2024-02-07 14:05:32.791175 |
250 |
70873809 |
Greywater management system |
72304 |
Greywater management system1 |
Plinth level |
-
latitude : 23.2886674
Longitude : 88.2486065
file name : Image_09022024154924727.png
|
2024-02-09 15:49:24.828924 |
251 |
70873809 |
Greywater management system |
72304 |
Greywater management system1 |
Completion of work |
-
latitude : 23.2886674
Longitude : 88.2486065
file name : Image_09022024154715977.png
|
2024-02-09 15:47:16.084365 |
252 |
58587821 |
Construction of Culvert at Moslemabad Math |
349212 |
Construction of Culvert at Moslemabad Math1 |
Plinth level |
-
latitude : 23.29773353
Longitude : 88.28312061
file name : Image_08022024170432840.png
|
2024-02-08 17:04:32.9398 |
253 |
58587821 |
Construction of Culvert at Moslemabad Math |
349212 |
Construction of Culvert at Moslemabad Math1 |
Completion of work |
-
latitude : 23.29776482
Longitude : 88.28315173
file name : Image_08022024165701262.png
|
2024-02-08 16:57:01.358584 |
254 |
70860729 |
Greywater management system |
188423 |
Greywater management system1 |
Plinth level |
-
latitude : 23.28516286
Longitude : 88.27590019
file name : Image_09022024152348449.png
|
2024-02-09 15:23:48.570769 |
255 |
70860729 |
Greywater management system |
188423 |
Greywater management system1 |
Completion of work |
-
latitude : 23.2851886
Longitude : 88.27584572
file name : Image_09022024151436293.png
|
2024-02-09 15:14:36.396439 |
256 |
70700404 |
Construction of roads |
230592 |
Construction of roads1 |
Plinth level |
-
latitude : 23.2964433,23.29644286
Longitude : 88.27185064,88.27185072
file name : Image_06032024165946583.png
|
2024-03-06 16:59:46.683361 |
257 |
70700404 |
Construction of roads |
230592 |
Construction of roads1 |
Completion of work |
-
latitude : 23.29644194,23.29644194
Longitude : 88.27182124,88.27182124
file name : Image_06032024164937739.png
|
2024-03-06 16:49:37.831417 |
258 |
70700404 |
Construction of roads |
230592 |
Construction of roads1 |
Completion of work |
-
latitude : 23.29693427,23.29693427
Longitude : 88.27161487,88.27161487
file name : Image_06032024154854877.png
|
2024-03-06 15:48:54.983381 |
259 |
70700404 |
Construction of roads |
230592 |
Construction of roads1 |
Completion of work |
-
latitude : 23.29693665,23.29693664
Longitude : 88.27161149,88.2716115
file name : Image_06032024154708266.png
|
2024-03-06 15:47:08.368881 |
260 |
70824076 |
Greywater management system |
218504 |
Greywater management system1 |
Plinth level |
-
latitude : 23.2929082
Longitude : 88.2755229
file name : Image_19122023152523079.png
|
2023-12-19 15:25:23.164845 |
261 |
70824076 |
Greywater management system |
218504 |
Greywater management system1 |
Completion of work |
-
latitude : 23.2929072
Longitude : 88.2755206
file name : Image_19122023151425446.png
|
2023-12-19 15:14:25.535173 |
262 |
58592040 |
Updatation of Toilet at Simlon Purba Para ICDS Center |
140000 |
Updatation of Toilet at Simlon Purba Para ICDS Center 1 |
Plinth level |
-
latitude : 23.26801832
Longitude : 88.25702029
file name : Image_19122023165845859.png
|
2023-12-19 16:58:45.971075 |
263 |
58592040 |
Updatation of Toilet at Simlon Purba Para ICDS Center |
140000 |
Updatation of Toilet at Simlon Purba Para ICDS Center 1 |
Completion of work |
-
latitude : 23.26800967
Longitude : 88.2570593
file name : Image_19122023165422750.png
|
2023-12-19 16:54:22.842115 |
264 |
69905449 |
Construction of roads |
177737 |
Construction of roads1 |
Plinth level |
-
latitude : 23.29184632,23.29184632
Longitude : 88.27747054,88.27747054
file name : Image_20122023164326859.png
|
2023-12-20 16:43:26.951594 |
265 |
69905449 |
Construction of roads |
177737 |
Construction of roads1 |
Completion of work |
-
latitude : 23.29183884,23.29183884
Longitude : 88.27744299,88.27744299
file name : Image_20122023163858303.png
|
2023-12-20 16:38:58.406998 |
266 |
70190583 |
Construction of roads |
287672 |
Construction of roads1 |
Plinth level |
-
latitude : 23.27260583,23.27260583
Longitude : 88.29205698,88.29205698
file name : Image_01032024132813835.png
|
2024-03-01 13:28:13.935942 |
267 |
70190583 |
Construction of roads |
287672 |
Construction of roads1 |
Completion of work |
-
latitude : 23.27264113,23.27264113
Longitude : 88.29203819,88.29203819
file name : Image_01032024132606613.png
|
2024-03-01 13:26:06.738663 |
268 |
70864448 |
Greywater management system |
307986 |
Greywater management system1 |
Plinth level |
-
latitude : 23.2715157
Longitude : 88.27468324
file name : Image_01032024134224468.png
|
2024-03-01 13:42:24.568138 |
269 |
70864448 |
Greywater management system |
307986 |
Greywater management system1 |
Completion of work |
-
latitude : 23.27151998
Longitude : 88.27466841
file name : Image_01032024133712473.png
|
2024-03-01 13:37:12.572355 |
270 |
70688539 |
Construction of roads |
330837 |
Construction of roads1 |
Plinth level |
-
latitude : 23.2656293,23.2656293
Longitude : 88.27899635,88.27899635
file name : Image_11032024153412080.png
|
2024-03-11 15:34:12.176717 |
271 |
70688539 |
Construction of roads |
330837 |
Construction of roads1 |
Completion of work |
-
latitude : 23.26561191,23.26561191
Longitude : 88.27896883,88.27896883
file name : Image_11032024153026550.png
|
2024-03-11 15:30:26.632014 |
272 |
70689220 |
Construction of roads |
111751 |
Construction of roads1 |
Roof laid |
-
latitude : 23.27751886,23.27751886
Longitude : 88.27346764,88.27346764
file name : Image_23092024142511370.png
|
2024-09-23 14:25:11.468731 |
273 |
70689220 |
Construction of roads |
111751 |
Construction of roads1 |
Plinth level |
-
latitude : 23.2854546,23.2854546
Longitude : 88.2785497,88.2785497
file name : Image_11032024152016809.png
|
2024-03-11 15:20:16.903136 |
274 |
70689220 |
Construction of roads |
111751 |
Construction of roads1 |
Completion of work |
-
latitude : 23.2854546,23.2854546
Longitude : 88.2785497,88.2785497
file name : Image_11032024151501889.png
|
2024-03-11 15:15:01.990943 |
275 |
39107835 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at simlon more |
110000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at simlon more1 |
Roof laid |
-
latitude : 23.27450185082853
Longitude : 88.25208007358015
file name : Image_23102021125653536.png
|
2021-10-23 12:56:53.653302 |
276 |
39107835 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at simlon more |
110000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at simlon more1 |
Plinth level |
-
latitude : 23.274608929641545
Longitude : 88.2521291077137
file name : Image_11092021102251197.png
|
2021-09-11 10:22:51.285377 |
277 |
39107835 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at simlon more |
110000 |
1 HP Submerssible Pump and Laying PVC pipe Line with sokepit at simlon more1 |
Completion of work |
-
latitude : 23.27449292410165
Longitude : 88.25204252265394
file name : Image_10092021132857377.png
|
2021-09-10 13:28:57.47281 |
278 |
49115235 |
Construction of Concrete road from moslemabad main road to yousuf sk pukur ghat |
180211 |
Construction of Concrete road from moslemabad main road to yousuf sk pukur ghat1 |
Roof laid |
-
latitude : 23.29144947230816,23.29144947230816,23.29144947230816
Longitude : 88.27785182744265,88.27785182744265,88.27785182744265
file name : Image_11072022150703921.png
|
2022-07-11 15:07:04.017017 |
279 |
49115235 |
Construction of Concrete road from moslemabad main road to yousuf sk pukur ghat |
180211 |
Construction of Concrete road from moslemabad main road to yousuf sk pukur ghat1 |
Plinth level |
-
latitude : 23.291429649107158,23.291429649107158
Longitude : 88.27781687490642,88.27781687490642
file name : Image_11072022150333949.png
|
2022-07-11 15:03:34.041351 |
280 |
49115235 |
Construction of Concrete road from moslemabad main road to yousuf sk pukur ghat |
180211 |
Construction of Concrete road from moslemabad main road to yousuf sk pukur ghat1 |
Completion of work |
-
latitude : 23.29143438488245,23.29143438488245
Longitude : 88.27779239974916,88.27779239974916
file name : Image_27042022152210384.png
|
2022-04-27 15:22:10.486238 |
281 |
49115235 |
Construction of Concrete road from moslemabad main road to yousuf sk pukur ghat |
180211 |
Construction of Concrete road from moslemabad main road to yousuf sk pukur ghat1 |
Completion of work |
-
latitude : 23.291402868926525,23.291402868926525,23.291402868926525
Longitude : 88.27780321240425,88.27780321240425,88.27780321240425
file name : Image_27042022152213924.png
|
2022-04-27 15:22:14.039365 |
282 |
49140645 |
Construction of Pucca drain from Simlon Ambagan mii to madan gop house |
300447 |
Construction of Pucca drain from Simlon Ambagan mii to madan gop house1 |
Roof laid |
-
latitude : 23.271703720092773,23.271703720092773
Longitude : 88.25600531883538,88.25600531883538
file name : Image_17052022131129499.png
|
2022-05-17 13:11:29.595447 |
283 |
49140645 |
Construction of Pucca drain from Simlon Ambagan mii to madan gop house |
300447 |
Construction of Pucca drain from Simlon Ambagan mii to madan gop house1 |
Plinth level |
-
latitude : 23.272356293164194,23.272356293164194
Longitude : 88.25630723498762,88.25630723498762
file name : Image_13042022132110331.png
|
2022-04-13 13:21:10.445964 |
284 |
49140645 |
Construction of Pucca drain from Simlon Ambagan mii to madan gop house |
300447 |
Construction of Pucca drain from Simlon Ambagan mii to madan gop house1 |
Completion of work |
-
latitude : 23.271707366220653,23.271736493334174
Longitude : 88.25602116063237,88.25613766908646
file name : Image_12042022115325477.png
|
2022-04-12 11:53:25.593477 |
285 |
58608349 |
Construction of Pucca Drain from Briddhapara Mojam Sk house to canal |
247827 |
Construction of Pucca Drain from Briddhapara Mojam Sk house to canal1 |
Plinth level |
-
latitude : 23.28028395,23.28028395,23.28028375
Longitude : 88.27266611,88.27266611,88.27266688
file name : Image_18032024154939424.png
|
2024-03-18 15:49:39.525001 |
286 |
58608349 |
Construction of Pucca Drain from Briddhapara Mojam Sk house to canal |
247827 |
Construction of Pucca Drain from Briddhapara Mojam Sk house to canal1 |
Completion of work |
-
latitude : 23.28026415,23.28026415
Longitude : 88.27265238,88.27265238
file name : Image_18032024154612634.png
|
2024-03-18 15:46:12.738498 |
287 |
58608349 |
Construction of Pucca Drain from Briddhapara Mojam Sk house to canal |
247827 |
Construction of Pucca Drain from Briddhapara Mojam Sk house to canal1 |
Completion of work |
-
latitude : 23.28031479,23.28031475
Longitude : 88.27265698,88.272657
file name : Image_18032024154602988.png
|
2024-03-18 15:46:03.086094 |
288 |
39079795 |
DATA COLLECTION AND DETA UPGRADATION AND WATER TESTING |
200000 |
DATA COLLECTION AND DETA UPGRADATION AND WATER TESTING1 |
Completion of work |
-
latitude : 23.281398522667587
Longitude : 88.25741901062429
file name : Image_11062021171442011.png
|
2021-06-11 17:14:42.099273 |
289 |
39105468 |
CONSTRUCTION OF BRIDDHA PARAI HAZARI TALAI ICDS KENDRA UP GRADEATION AND TUBE WELL PLAT FORM |
151161 |
CONSTRUCTION OF BRIDDHA PARAI HAZARI TALAI ICDS KENDRA UP GRADEATION AND TUBE WELL PLAT FORM1 |
Roof laid |
-
latitude : 23.28868679702282
Longitude : 88.27273442409933
file name : Image_13042022132120493.png
|
2022-04-13 13:21:20.584083 |
290 |
39105468 |
CONSTRUCTION OF BRIDDHA PARAI HAZARI TALAI ICDS KENDRA UP GRADEATION AND TUBE WELL PLAT FORM |
151161 |
CONSTRUCTION OF BRIDDHA PARAI HAZARI TALAI ICDS KENDRA UP GRADEATION AND TUBE WELL PLAT FORM1 |
Plinth level |
-
latitude : 23.28870104625821
Longitude : 88.27263442799449
file name : Image_06012022145031546.png
|
2022-01-06 14:50:31.665422 |
291 |
39105468 |
CONSTRUCTION OF BRIDDHA PARAI HAZARI TALAI ICDS KENDRA UP GRADEATION AND TUBE WELL PLAT FORM |
151161 |
CONSTRUCTION OF BRIDDHA PARAI HAZARI TALAI ICDS KENDRA UP GRADEATION AND TUBE WELL PLAT FORM1 |
Completion of work |
-
latitude : 23.288637888617814
Longitude : 88.27265546657145
file name : Image_20122021135801676.png
|
2021-12-20 13:58:01.80464 |
292 |
70945872 |
Water Supply to villages |
348246 |
Water Supply to villages1 |
Plinth level |
-
latitude : 23.26174654
Longitude : 88.27857249
file name : Image_19032024130128112.png
|
2024-03-19 13:01:28.225849 |
293 |
70945872 |
Water Supply to villages |
348246 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.26175391
Longitude : 88.2786182
file name : Image_19032024125702985.png
|
2024-03-19 12:57:03.070776 |
294 |
70183916 |
Construction of roads |
85280 |
Construction of roads1 |
Plinth level |
-
latitude : 23.2788426,23.2788426
Longitude : 88.2862346,88.2862346
file name : Image_16012024151920266.png
|
2024-01-16 15:19:20.364712 |
295 |
70183916 |
Construction of roads |
85280 |
Construction of roads1 |
Completion of work |
-
latitude : 23.2788426,23.2788426
Longitude : 88.2862346,88.2862346
file name : Image_16012024151256273.png
|
2024-01-16 15:12:56.371068 |
296 |
70857089 |
Greywater management system |
349955 |
Greywater management system1 |
Plinth level |
-
latitude : 23.26756831
Longitude : 88.25466496
file name : Image_10062024171411812.png
|
2024-06-10 17:14:11.916678 |
297 |
70857089 |
Greywater management system |
349955 |
Greywater management system1 |
Completion of work |
-
latitude : 23.26755585
Longitude : 88.25467023
file name : Image_10062024170949016.png
|
2024-06-10 17:09:49.12975 |
298 |
70934609 |
Providing piped water supply to public institutions |
234663 |
Providing piped water supply to public institutions1 |
Plinth level |
-
latitude : 23.28986089
Longitude : 88.27250109
file name : Image_28032024125223853.png
|
2024-03-28 12:52:23.956378 |
299 |
70934609 |
Providing piped water supply to public institutions |
234663 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 23.28988547
Longitude : 88.27248604
file name : Image_28032024125051067.png
|
2024-03-28 12:50:51.163019 |
300 |
70924201 |
Creation of other water recharging structure |
156229 |
Creation of other water recharging structure1 |
Plinth level |
-
latitude : 23.2933942
Longitude : 88.2465908
file name : Image_28032024133218135.png
|
2024-03-28 13:32:18.235169 |
301 |
70924201 |
Creation of other water recharging structure |
156229 |
Creation of other water recharging structure1 |
Completion of work |
-
latitude : 23.2933911
Longitude : 88.2465927
file name : Image_28032024131434135.png
|
2024-03-28 13:14:34.226178 |
302 |
70821321 |
Greywater management system |
350000 |
Greywater management system1 |
Plinth level |
-
latitude : 23.28913465
Longitude : 88.27346607
file name : Image_28032024125855848.png
|
2024-03-28 12:58:55.934774 |
303 |
70821321 |
Greywater management system |
350000 |
Greywater management system1 |
Completion of work |
-
latitude : 23.28913373
Longitude : 88.27346948
file name : Image_28032024125548657.png
|
2024-03-28 12:55:48.742493 |
304 |
70933280 |
Creation of other water recharging structure |
148404 |
Creation of other water recharging structure1 |
Plinth level |
-
latitude : 23.27942065
Longitude : 88.23836631
file name : Image_28032024140540711.png
|
2024-03-28 14:05:40.79762 |
305 |
70933280 |
Creation of other water recharging structure |
148404 |
Creation of other water recharging structure1 |
Completion of work |
-
latitude : 23.27943133
Longitude : 88.2383774
file name : Image_28032024140437843.png
|
2024-03-28 14:04:37.942728 |
306 |
70944068 |
Water Supply to villages |
148404 |
Water Supply to villages1 |
Plinth level |
-
latitude : 23.28371974
Longitude : 88.24565205
file name : Image_28032024141703051.png
|
2024-03-28 14:17:03.167922 |
307 |
70944068 |
Water Supply to villages |
148404 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.28375707
Longitude : 88.2456586
file name : Image_28032024141525885.png
|
2024-03-28 14:15:25.977758 |
308 |
70838029 |
Greywater management system |
332262 |
Greywater management system1 |
Roof laid |
-
latitude : 23.26826543
Longitude : 88.25697327
file name : Image_01072024133956903.png
|
2024-07-01 13:39:56.995844 |
309 |
70838029 |
Greywater management system |
332262 |
Greywater management system1 |
Roof laid |
-
latitude : 23.26826564
Longitude : 88.2569733
file name : Image_01072024134037943.png
|
2024-07-01 13:40:38.027721 |
310 |
70838029 |
Greywater management system |
332262 |
Greywater management system1 |
Plinth level |
-
latitude : 23.26773933
Longitude : 88.25705781
file name : Image_01072024132723906.png
|
2024-07-01 13:27:23.992707 |
311 |
70838029 |
Greywater management system |
332262 |
Greywater management system1 |
Completion of work |
-
latitude : 23.26774496
Longitude : 88.25711897
file name : Image_01072024132509130.png
|
2024-07-01 13:25:09.221306 |
312 |
70691296 |
Construction of roads |
109909 |
Construction of roads1 |
Roof laid |
-
latitude : 23.27683837,23.27683825
Longitude : 88.29268944,88.29268941
file name : Image_23092024140645916.png
|
2024-09-23 14:06:46.002549 |
313 |
70691296 |
Construction of roads |
109909 |
Construction of roads1 |
Plinth level |
-
latitude : 23.27680814,23.27680814
Longitude : 88.29269314,88.29269319
file name : Image_11032024155223462.png
|
2024-03-11 15:52:23.558908 |
314 |
70691296 |
Construction of roads |
109909 |
Construction of roads1 |
Completion of work |
-
latitude : 23.27680815,23.27680815
Longitude : 88.29264696,88.29264696
file name : Image_11032024154632821.png
|
2024-03-11 15:46:32.924316 |
315 |
107680715 |
Grey Water management- collection infrastructure |
258010 |
Grey Water management- collection infrastructure1 |
Roof laid |
-
latitude : 23.28877887
Longitude : 88.28019476
file name : Image_23092024153206908.png
|
2024-09-23 15:32:06.980603 |
316 |
107680715 |
Grey Water management- collection infrastructure |
258010 |
Grey Water management- collection infrastructure1 |
Plinth level |
-
latitude : 23.2887694
Longitude : 88.2801895
file name : Image_23092024152900341.png
|
2024-09-23 15:29:00.413339 |
317 |
107680715 |
Grey Water management- collection infrastructure |
258010 |
Grey Water management- collection infrastructure1 |
Completion of work |
-
latitude : 23.28879788
Longitude : 88.28017342
file name : Image_23092024151643019.png
|
2024-09-23 15:16:43.106028 |
318 |
107680715 |
Grey Water management- collection infrastructure |
258010 |
Grey Water management- collection infrastructure1 |
Completion of work |
-
latitude : 23.28881416
Longitude : 88.28019233
file name : Image_23092024151245946.png
|
2024-09-23 15:12:46.026854 |
319 |
107680280 |
Grey Water management- collection infrastructure |
262553 |
Grey Water management- collection infrastructure1 |
Plinth level |
-
latitude : 23.28378461
Longitude : 88.26995434
file name : Image_27092024171726584.png
|
2024-09-27 17:17:26.664605 |
320 |
107680280 |
Grey Water management- collection infrastructure |
262553 |
Grey Water management- collection infrastructure1 |
Completion of work |
-
latitude : 23.28377944
Longitude : 88.26995739
file name : Image_27092024170525335.png
|
2024-09-27 17:05:25.419549 |
321 |
97354378 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure |
106783 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure1 |
Plinth level |
-
latitude : 23.28881369
Longitude : 88.24799754
file name : Image_27092024145842625.png
|
2024-09-27 14:58:42.707622 |
322 |
97354378 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure |
106783 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure1 |
Completion of work |
-
latitude : 23.28909
Longitude : 88.2475957
file name : Image_27092024145321775.png
|
2024-09-27 14:53:21.865491 |
323 |
58621730 |
Updatation of Toilet at Surjapur ICDS Center |
100601 |
Updatation of Toilet at Surjapur ICDS Center1 |
Roof laid |
-
latitude : 23.26088891
Longitude : 88.27817069
file name : Image_02082024171429001.png
|
2024-08-02 17:14:29.103457 |
324 |
58621730 |
Updatation of Toilet at Surjapur ICDS Center |
100601 |
Updatation of Toilet at Surjapur ICDS Center1 |
Plinth level |
-
latitude : 23.2608747
Longitude : 88.27817213
file name : Image_02082024170617637.png
|
2024-08-02 17:06:17.747683 |
325 |
58621730 |
Updatation of Toilet at Surjapur ICDS Center |
100601 |
Updatation of Toilet at Surjapur ICDS Center1 |
Completion of work |
-
latitude : 23.26088473
Longitude : 88.27817672
file name : Image_02082024170239608.png
|
2024-08-02 17:02:39.705307 |
326 |
70935601 |
Creation of other water recharging structure |
160000 |
Creation of other water recharging structure1 |
Plinth level |
-
latitude : 23.29176997
Longitude : 88.24855063
file name : Image_05122023173302770.png
|
2023-12-05 17:33:02.857778 |
327 |
70935601 |
Creation of other water recharging structure |
160000 |
Creation of other water recharging structure1 |
Completion of work |
-
latitude : 23.2902384
Longitude : 88.2486741
file name : Image_05122023172724723.png
|
2023-12-05 17:27:24.806563 |
328 |
70914794 |
Grey Water management- collection infrastructure |
270203 |
Grey Water management- collection infrastructure1 |
Roof laid |
-
latitude : 23.27113225
Longitude : 88.25776258
file name : Image_14082024134526376.png
|
2024-08-14 13:45:26.475914 |
329 |
70914794 |
Grey Water management- collection infrastructure |
270203 |
Grey Water management- collection infrastructure1 |
Plinth level |
-
latitude : 23.27112527
Longitude : 88.25772631
file name : Image_14082024133802615.png
|
2024-08-14 13:38:02.7019 |
330 |
70914794 |
Grey Water management- collection infrastructure |
270203 |
Grey Water management- collection infrastructure1 |
Completion of work |
-
latitude : 23.27112469
Longitude : 88.25774967
file name : Image_14082024132751634.png
|
2024-08-14 13:27:51.73686 |