1 |
34504272 |
VECTOR BORN DEACES PURPOSE AT GP AREA |
45000 |
VECTOR BORN DEACES PURPOSE AT GP AREA1 |
Roof laid |
-
latitude : 23.64981623366475,23.649386409670115
Longitude : 87.39700340665877,87.39690131507814
file name : Image_22022022161714571.png
|
2022-02-22 16:17:14.689459 |
2 |
34504272 |
VECTOR BORN DEACES PURPOSE AT GP AREA |
45000 |
VECTOR BORN DEACES PURPOSE AT GP AREA1 |
Roof laid |
-
latitude : 23.650373588316143,23.650505058467388
Longitude : 87.39632866345346,87.39635238423944
file name : Image_22022022080846433.png
|
2022-02-22 08:08:46.550079 |
3 |
34504272 |
VECTOR BORN DEACES PURPOSE AT GP AREA |
45000 |
VECTOR BORN DEACES PURPOSE AT GP AREA1 |
Roof laid |
-
latitude : 23.668137858621776,23.668147791177034,23.669254956766963
Longitude : 87.39072863012552,87.3907507583499,87.39054280333221
file name : Image_22022022082941692.png
|
2022-02-22 08:29:41.807237 |
4 |
47144730 |
Construction of Concrete Road from Rakhal Halder door to Amal Mondal door at Ajaypally |
350000 |
Construction of Concrete Road from Rakhal Halder door to Amal Mondal door at Ajaypally1 |
Roof laid |
-
latitude : 23.6257149,23.625716
Longitude : 87.406567,87.4065585
file name : Image_08122023144201516.png
|
2023-12-08 14:42:01.598357 |
5 |
47144730 |
Construction of Concrete Road from Rakhal Halder door to Amal Mondal door at Ajaypally |
350000 |
Construction of Concrete Road from Rakhal Halder door to Amal Mondal door at Ajaypally1 |
Plinth level |
-
latitude : 23.6257142,23.6257119
Longitude : 87.4065648,87.4065603
file name : Image_08122023144003035.png
|
2023-12-08 14:40:03.131202 |
6 |
47144730 |
Construction of Concrete Road from Rakhal Halder door to Amal Mondal door at Ajaypally |
350000 |
Construction of Concrete Road from Rakhal Halder door to Amal Mondal door at Ajaypally1 |
Completion of work |
-
latitude : 23.5109349,23.616285184398293
Longitude : 87.381477,87.4356316588819
file name : Image_24012023154454393.png
|
2023-01-24 15:44:54.551702 |
7 |
39037744 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT NAYAKANCHANPUR |
301634 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT NAYAKANCHANPUR1 |
Roof laid |
-
latitude : 23.67938042152673
Longitude : 87.40402266383171
file name : Image_31032021101327660.png
|
2021-03-31 10:13:27.760533 |
8 |
39037744 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT NAYAKANCHANPUR |
301634 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT NAYAKANCHANPUR1 |
Roof laid |
-
latitude : 23.67938042152673
Longitude : 87.40402266383171
file name : Image_31032021101336070.png
|
2021-03-31 10:13:36.162358 |
9 |
39037909 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT BASUDEVPUR |
297553 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT BASUDEVPUR1 |
Roof laid |
-
latitude : 23.669546395540237
Longitude : 87.40128220058978
file name : Image_31032021094616916.png
|
2021-03-31 09:46:17.045945 |
10 |
39038136 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT BINODPUR |
349730 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT BINODPUR1 |
Completion of work |
-
latitude : 23.66489821113646
Longitude : 87.40082739852369
file name : Image_30122021084659327.png
|
2021-12-30 08:46:59.434457 |
11 |
39038532 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT AJAYPALLY |
349730 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT AJAYPALLY1 |
Completion of work |
-
latitude : 23.61664166674018
Longitude : 87.43560592643917
file name : Image_31122021103749965.png
|
2021-12-31 10:37:50.123223 |
12 |
39048067 |
CONS OF CC ROAD FROM UTTAM LOHAR HOUSE TO THAKURANIBAZAR ZILLAPARISHD ROAD AT JAMDAHA |
348012 |
CONS OF CC ROAD FROM UTTAM LOHAR HOUSE TO THAKURANIBAZAR ZILLAPARISHD ROAD AT JAMDAHA1 |
Completion of work |
-
latitude : 23.646720587275922,23.646598714403808
Longitude : 87.40252649411559,87.40283142775297
file name : Image_28012022165905867.png
|
2022-01-28 16:59:06.072093 |
13 |
39053625 |
CONS OF BOUNDARY WALL OF ICDS NO 72 AT SASIPUR |
252426 |
CONS OF BOUNDARY WALL OF ICDS NO 72 AT SASIPUR1 |
Roof laid |
-
latitude : 23.65903050173074
Longitude : 87.39400922320783
file name : Image_06062021095028635.png
|
2021-06-06 09:50:28.76922 |
14 |
39051669 |
CONSTRUCTION OF BOUNDARY WALL OF RAJHAT PRIMARY SCHOOL |
250475 |
CONSTRUCTION OF BOUNDARY WALL OF RAJHAT PRIMARY SCHOOL1 |
Roof laid |
-
latitude : 23.649257034994662
Longitude : 87.3999838437885
file name : Image_02062021083335799.png
|
2021-06-02 08:33:35.910143 |
15 |
47144056 |
Construction of concrete Road from Annapurna Mandir to Uttam Ghosh at Shashipur |
94510 |
Construction of concrete Road from Annapurna Mandir to Uttam Ghosh at Shashipur1 |
Roof laid |
-
latitude : 23.660619542934,23.66061053238809
Longitude : 87.3945030849427,87.39478262141347
file name : Image_28022023080653925.png
|
2023-02-28 08:06:54.012031 |
16 |
39038195 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT SHASHIPUR |
398309 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT SHASHIPUR1 |
Completion of work |
-
latitude : 23.65892991889268
Longitude : 87.40333668887615
file name : Image_21022022101216933.png
|
2022-02-21 10:12:17.024609 |
17 |
38911960 |
CONS OF CC ROAD FROM DULAL GHOSH MATH TO ADIBASIPARA AT NAYAKANCHANPUR |
398441 |
CONS OF CC ROAD FROM DULAL GHOSH MATH TO ADIBASIPARA AT NAYAKANCHANPUR1 |
Completion of work |
-
latitude : 23.68143901694566,23.681294890120625
Longitude : 87.40103677846491,87.40170003846288
file name : Image_28122021155719958.png
|
2021-12-28 15:57:20.075599 |
18 |
39048136 |
CONS OF CC ROAD FROM SUNDHIPUR MONDIR TO SUBHASH SARKAR HOUSE AT DUBRAJPUR |
398145 |
CONS OF CC ROAD FROM SUNDHIPUR MONDIR TO SUBHASH SARKAR HOUSE AT DUBRAJPUR1 |
Plinth level |
-
latitude : 23.67660337127745,23.67762567009777
Longitude : 87.41223894059658,87.41223676130176
file name : Image_19122021113848058.png
|
2021-12-19 11:38:48.165934 |
19 |
39048102 |
CONS OF CC ROAD FROM NAMOBETA RUIDAS PARA TO DIHIBETA KALITALA AT JAMDAHA |
397790 |
CONS OF CC ROAD FROM NAMOBETA RUIDAS PARA TO DIHIBETA KALITALA AT JAMDAHA1 |
Roof laid |
-
latitude : 23.644636594690382,23.644512458704412
Longitude : 87.41162538528442,87.41226668469608
file name : Image_23112021134240530.png
|
2021-11-23 13:42:40.646076 |
20 |
39050387 |
CONS OF CC ROAD FROM MOJIBUL DOORTO BADAL BAURI DOOR AT JATGORIA |
333824 |
CONS OF CC ROAD FROM MOJIBUL DOORTO BADAL BAURI DOOR AT JATGORIA1 |
Roof laid |
-
latitude : 23.61798830330372,23.61860567238182
Longitude : 87.39125115796924,87.39145777188241
file name : Image_02062021080056776.png
|
2021-06-02 08:00:56.899283 |
21 |
39038719 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT DUBRAJPUR COLONY |
348911 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT DUBRAJPUR COLONY1 |
Roof laid |
-
latitude : 23.663474209606647
Longitude : 87.40538137033582
file name : Image_31032021104144975.png
|
2021-03-31 10:41:45.088643 |
22 |
39037852 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT KANCHANPUR |
348911 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT KANCHANPUR1 |
Roof laid |
-
latitude : 23.67212923709303
Longitude : 87.40227168425918
file name : Image_31032021095927370.png
|
2021-03-31 09:59:27.520125 |
23 |
39038655 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT SHIBPUR |
353578 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT SHIBPUR1 |
Roof laid |
-
latitude : 23.626544843427837
Longitude : 87.41271712817252
file name : Image_30032021151215651.png
|
2021-03-30 15:12:15.778742 |
24 |
39051778 |
CONSTRUCTION OF BOUNDARY WALL OF JAMDAHA PRIMARI SCHOOL |
92246 |
CONSTRUCTION OF BOUNDARY WALL OF JAMDAHA PRIMARI SCHOOL1 |
Roof laid |
-
latitude : 23.6477261
Longitude : 87.4046016
file name : Image_22032021165714593.png
|
2021-03-22 16:57:14.802358 |
25 |
39048290 |
CONS OF CC ROAD FROM PMGSY ROAD TO PREMA PUKUR AT NABAGRAM |
348222 |
CONS OF CC ROAD FROM PMGSY ROAD TO PREMA PUKUR AT NABAGRAM1 |
Roof laid |
-
latitude : 23.6378733208403,23.637101682834327
Longitude : 87.41769220679998,87.41687354631722
file name : Image_22032021164350822.png
|
2021-03-22 16:43:51.004316 |
26 |
39052032 |
CONSTRUCTION OF BOUNDARY WALL OF FULJHOR PRIMARY SCHOOL |
271080 |
CONSTRUCTION OF BOUNDARY WALL OF FULJHOR PRIMARY SCHOOL1 |
Roof laid |
-
latitude : 23.634913000278175
Longitude : 87.38505919463933
file name : Image_22032021151710236.png
|
2021-03-22 15:17:10.395447 |
27 |
39047916 |
CONS OF CC ROAD FROM KULU PUKUR TO ZILLA PARISHAD ROAD AT BINODPUR |
213489 |
CONS OF CC ROAD FROM KULU PUKUR TO ZILLA PARISHAD ROAD AT BINODPUR1 |
Roof laid |
-
latitude : 23.663641051389277,23.66346021182835
Longitude : 87.39785609766841,87.39878598600626
file name : Image_18032021101641661.png
|
2021-03-18 10:16:41.769067 |
28 |
47145032 |
Baby friendly room in front of Sub-Center |
566392 |
Baby friendly room in front of Sub-Center1 |
Roof laid |
-
latitude : 23.6261965
Longitude : 87.4062144
file name : Image_28052022101747408.png
|
2022-05-28 10:17:47.507965 |
29 |
47206333 |
Installation of Submersible at Dubrajpur Colony |
349730 |
Installation of Submersible at Dubrajpur Colony 1 |
Roof laid |
-
latitude : 23.65509846713394
Longitude : 87.40841721184552
file name : Image_05082022083857558.png
|
2022-08-05 08:38:57.662142 |
30 |
58714468 |
CONSTRUCTION OF CC DRAIN WITH COVER FROM BASUDEB BANERJEE DOOR TO MAHESWAR PAN VACCENT LAND AT RAJHA |
203642 |
CONSTRUCTION OF CC DRAIN WITH COVER FROM BASUDEB BANERJEE DOOR TO MAHESWAR PAN VACCENT LAND AT RAJHA1 |
Roof laid |
-
latitude : 23.649903489276767,23.65076313726604
Longitude : 87.3968150652945,87.39674147218466
file name : Image_23032023090419979.png
|
2023-03-23 09:04:20.0684 |
31 |
57936386 |
MATERIALS FOR NEW TUBEWELL SETUP AND EXISTING TUBEWELL AT BIDBIHAR GP AREA |
400000 |
MATERIALS FOR NEW TUBEWELL SETUP AND EXISTING TUBEWELL AT BIDBIHAR GP AREA1 |
Plinth level |
-
latitude : 23.6261963
Longitude : 87.4062262
file name : Image_24032023114525078.png
|
2023-03-24 11:45:25.182553 |
32 |
57732985 |
INSTALLATION OF SOLAR SUBMERSIBLE WITH DRAINAGE AT KAJLADIHI VILLAGE OF SANSAD XII |
349899 |
INSTALLATION OF SOLAR SUBMERSIBLE WITH DRAINAGE AT KAJLADIHI VILLAGE OF SANSAD XII1 |
Roof laid |
-
latitude : 23.623541523702443
Longitude : 87.42034122347832
file name : Image_17042023102239818.png
|
2023-04-17 10:22:39.959844 |
33 |
47144810 |
Construction of Boundary Wall of GP Office Premises |
500000 |
Construction of Boundary Wall of GP Office Premises 1 |
Plinth level |
-
latitude : 23.6259032
Longitude : 87.4064591
file name : Image_11042023124031172.png
|
2023-04-11 12:40:31.286035 |
34 |
57728434 |
INSTALLATION OF SOLAR SUBMERSIBLE WITH DRAINAGE AT ITADANGA VILLAGE OF SANSAD V |
349899 |
INSTALLATION OF SOLAR SUBMERSIBLE WITH DRAINAGE AT ITADANGA VILLAGE OF SANSAD V1 |
Roof laid |
-
latitude : 23.656772039830685
Longitude : 87.40183708257973
file name : Image_18042023094711094.png
|
2023-04-18 09:47:11.208562 |
35 |
66486384 |
CONSTRUCTION OF OFFICE CUM STORE ROOM FOR SWM PROJECT AT KRISHNAPUR MOUZA |
359523 |
CONSTRUCTION OF OFFICE CUM STORE ROOM FOR SWM PROJECT AT KRISHNAPUR MOUZA1 |
Roof laid |
-
latitude : 23.63700503949076
Longitude : 87.42449764162302
file name : Image_11052023142221582.png
|
2023-05-11 14:22:21.686965 |
36 |
39040302 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL |
1441533 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL1 |
Plinth level |
-
latitude : 23.68117473553866
Longitude : 87.396977590397
file name : Image_12042021084639837.png
|
2021-04-12 08:46:39.993545 |
37 |
39040302 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL |
1441533 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL1 |
Plinth level |
-
latitude : 23.66947707720101
Longitude : 87.40132025443017
file name : Image_31032021094807901.png
|
2021-03-31 09:48:08.019969 |
38 |
39040302 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL |
1441533 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL1 |
Plinth level |
-
latitude : 23.67218732368201
Longitude : 87.40237972699106
file name : Image_31032021101319020.png
|
2021-03-31 10:13:19.12982 |
39 |
39040302 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL |
1441533 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL1 |
Plinth level |
-
latitude : 23.679459085687995
Longitude : 87.40408460609615
file name : Image_31032021101446909.png
|
2021-03-31 10:14:47.025707 |
40 |
39040302 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL |
1441533 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL1 |
Plinth level |
-
latitude : 23.66341490764171
Longitude : 87.40541523322463
file name : Image_31032021114910494.png
|
2021-03-31 11:49:10.602128 |
41 |
39040302 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL |
1441533 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL2 |
Plinth level |
-
latitude : 23.657612493261695
Longitude : 87.39594024606049
file name : Image_31032021094501151.png
|
2021-03-31 09:45:01.262893 |
42 |
39040302 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL |
1441533 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL2 |
Plinth level |
-
latitude : 23.64935053512454
Longitude : 87.39688631147146
file name : Image_31032021114918988.png
|
2021-03-31 11:49:19.094987 |
43 |
39040302 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL |
1441533 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL2 |
Plinth level |
-
latitude : 23.64935053512454
Longitude : 87.39688631147146
file name : Image_31032021114924964.png
|
2021-03-31 11:49:25.070793 |
44 |
39040302 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL |
1441533 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL2 |
Plinth level |
-
latitude : 23.630144661292434
Longitude : 87.40376492030919
file name : Image_30032021154707051.png
|
2021-03-30 15:47:07.157996 |
45 |
39040302 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL |
1441533 |
TUBEWELL MATIREALS AND WAGES FOR NEW INSTALLATION OR REPAIRING TUBEWELL2 |
Plinth level |
-
latitude : 23.62653398886323
Longitude : 87.41281494498253
file name : Image_30032021151542552.png
|
2021-03-30 15:15:42.671265 |
46 |
47144848 |
Renovation & Maintanance of GP Office Building |
494615 |
Renovation & Maintanance of GP Office Building1 |
Plinth level |
-
latitude : 23.6257352
Longitude : 87.4065432
file name : Image_04042022120848194.png
|
2022-04-04 12:08:48.303983 |
47 |
66486229 |
CONSTRUCTION OF FURENAL SHED AT BINODPUR VILLAGE |
99471 |
CONSTRUCTION OF FURENAL SHED AT BINODPUR VILLAGE1 |
Roof laid |
-
latitude : 23.663783920928836
Longitude : 87.39933483302593
file name : Image_16052023095649332.png
|
2023-05-16 09:56:49.444523 |
48 |
66486318 |
CONSTRUCTION OF FURENAL SHED AT SHIBPUR VILLAGE |
97039 |
CONSTRUCTION OF FURENAL SHED AT SHIBPUR VILLAGE1 |
Roof laid |
-
latitude : 23.630560780875385
Longitude : 87.40152980200946
file name : Image_22052023160816135.png
|
2023-05-22 16:08:16.233718 |
49 |
57934855 |
CONSTRUCTION OF CONCRETE CULVERT INFRONT OF GULISTHAN DOOR AT AT JATGORIA |
32382 |
CONSTRUCTION OF CONCRETE CULVERT INFRONT OF GULISTHAN DOOR AT AT JATGORIA1 |
Roof laid |
-
latitude : 23.6162373656407,23.61627893988043
Longitude : 87.38880079239607,87.38878478296101
file name : Image_29052023185523642.png
|
2023-05-29 18:55:23.745088 |
50 |
57935899 |
REPAIRING AND MAINTANANCE OF EXISTING TUBEWELL UNDER BIDBIHAR GP AREA |
400000 |
REPAIRING AND MAINTANANCE OF EXISTING TUBEWELL UNDER BIDBIHAR GP AREA1 |
Completion of work |
-
latitude : 23.6257133
Longitude : 87.4065819
file name : Image_05062023130820882.png
|
2023-06-05 13:08:20.982026 |
51 |
57935373 |
RENOVATION OF RAINWATER HERVESTING AT GP OFFICE PREMISES |
99802 |
RENOVATION OF RAINWATER HERVESTING AT GP OFFICE PREMISES1 |
Roof laid |
-
latitude : 23.6257109
Longitude : 87.4065817
file name : Image_08062023172333294.png
|
2023-06-08 17:23:33.431275 |
52 |
66485396 |
Water Supply to villages |
450000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 23.677036338485777
Longitude : 87.39739785902202
file name : Image_22062023163055158.png
|
2023-06-22 16:30:55.29937 |
53 |
66485396 |
Water Supply to villages |
450000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 23.677036338485777
Longitude : 87.39739785902202
file name : Image_22062023163104898.png
|
2023-06-22 16:31:05.041595 |
54 |
58238943 |
INSTALLATION OF SOLAR ELECTRIFICATION SYSTEM FOR GP OFFICE AND MEETTING HALL |
842006 |
INSTALLATION OF SOLAR ELECTRIFICATION SYSTEM FOR GP OFFICE AND MEETTING HALL1 |
Roof laid |
-
latitude : 23.6256962
Longitude : 87.4065576
file name : Image_22062023132822659.png
|
2023-06-22 13:28:22.772766 |
55 |
66485547 |
Creation of a new source of drinking water |
349811 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.63681099843234
Longitude : 87.42432455532253
file name : Image_11092023103257071.png
|
2023-09-11 10:32:57.170003 |
56 |
57732266 |
INSTALLATION OF SOLAR SUBMERSIBLE WITH DRAINAGE AT RADHANAGAR VILLAGE OF SANSAD X |
450000 |
INSTALLATION OF SOLAR SUBMERSIBLE WITH DRAINAGE AT RADHANAGAR VILLAGE OF SANSAD X1 |
Completion of work |
-
latitude : 23.63178596366197
Longitude : 87.42039453238249
file name : Image_19072023174749454.png
|
2023-07-19 17:47:49.559477 |
57 |
67384327 |
Creation of drainage channel for management of grey water |
153283 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.6257326
Longitude : 87.4065492
file name : Image_22042024120200787.png
|
2024-04-22 12:02:00.858802 |
58 |
67384327 |
Creation of drainage channel for management of grey water |
153283 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.65029384
Longitude : 87.3969337
file name : Image_22042024115705690.png
|
2024-04-22 11:57:05.763973 |
59 |
67384327 |
Creation of drainage channel for management of grey water |
153283 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.6644999
Longitude : 87.39362593
file name : Image_23022024115004006.png
|
2024-02-23 11:50:04.087535 |
60 |
67383795 |
Water Supply to villages |
349925 |
Water Supply to villages1 |
Roof laid |
-
latitude : 23.66711221
Longitude : 87.4050694
file name : Image_21052024165602322.png
|
2024-05-21 16:56:02.39609 |
61 |
67383795 |
Water Supply to villages |
349925 |
Water Supply to villages1 |
Plinth level |
-
latitude : 23.66712129
Longitude : 87.40508847
file name : Image_21052024165250065.png
|
2024-05-21 16:52:50.136592 |
62 |
67383795 |
Water Supply to villages |
349925 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.66721317
Longitude : 87.40511619
file name : Image_23022024113845902.png
|
2024-02-23 11:38:45.980382 |
63 |
58275204 |
CONSTRUCTION OF BOUNDARY WALL OF BETA FP SCHOOL AT NAMOBETA |
185565 |
CONSTRUCTION OF BOUNDARY WALL OF BETA FP SCHOOL AT NAMOBETA1 |
Plinth level |
-
latitude : 23.625728
Longitude : 87.4065512
file name : Image_09072024133926619.png
|
2024-07-09 13:39:26.684809 |
64 |
58275204 |
CONSTRUCTION OF BOUNDARY WALL OF BETA FP SCHOOL AT NAMOBETA |
185565 |
CONSTRUCTION OF BOUNDARY WALL OF BETA FP SCHOOL AT NAMOBETA1 |
Completion of work |
-
latitude : 23.64472242537886
Longitude : 87.41406200453639
file name : Image_13092023100755986.png
|
2023-09-13 10:07:56.087984 |
65 |
67383719 |
Water Supply to villages |
349925 |
Water Supply to villages1 |
Plinth level |
-
latitude : 23.63551716785878
Longitude : 87.38521643914282
file name : Image_22112023121227465.png
|
2023-11-22 12:12:27.572254 |
66 |
67383719 |
Water Supply to villages |
349925 |
Water Supply to villages1 |
Plinth level |
-
latitude : 23.63545128609985
Longitude : 87.3853368870914
file name : Image_22112023120500869.png
|
2023-11-22 12:05:00.960793 |
67 |
67383719 |
Water Supply to villages |
349925 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.63541243597865
Longitude : 87.38534929230809
file name : Image_21112023110129246.png
|
2023-11-21 11:01:29.339714 |
68 |
67380154 |
Solar Power Installation |
144284 |
Solar Power Installation1 |
Roof laid |
-
latitude : 23.663651
Longitude : 87.4066222
file name : Image_23112023093723045.png
|
2023-11-23 09:37:23.141818 |
69 |
67380154 |
Solar Power Installation |
144284 |
Solar Power Installation1 |
Plinth level |
-
latitude : 23.6636491
Longitude : 87.4066159
file name : Image_23112023093320890.png
|
2023-11-23 09:33:20.973303 |
70 |
67380154 |
Solar Power Installation |
144284 |
Solar Power Installation1 |
Completion of work |
-
latitude : 23.66404438856989
Longitude : 87.40682498551905
file name : Image_23112023092607184.png
|
2023-11-23 09:26:07.283358 |
71 |
67380154 |
Solar Power Installation |
144284 |
Solar Power Installation1 |
Completion of work |
-
latitude : 23.650389765389264
Longitude : 87.39716702140868
file name : Image_23112023091146830.png
|
2023-11-23 09:11:46.902618 |
72 |
67380154 |
Solar Power Installation |
144284 |
Solar Power Installation1 |
Completion of work |
-
latitude : 23.66233628243208
Longitude : 87.40604463033378
file name : Image_22112023171926850.png
|
2023-11-22 17:19:26.931332 |
73 |
67380154 |
Solar Power Installation |
144284 |
Solar Power Installation1 |
Completion of work |
-
latitude : 23.664860618300736
Longitude : 87.40715514868498
file name : Image_22112023092339994.png
|
2023-11-22 09:23:40.08741 |
74 |
67380154 |
Solar Power Installation |
144284 |
Solar Power Installation1 |
Completion of work |
-
latitude : 23.66449147928506
Longitude : 87.40694903768599
file name : Image_22112023092020415.png
|
2023-11-22 09:20:20.513268 |
75 |
67380154 |
Solar Power Installation |
144284 |
Solar Power Installation1 |
Completion of work |
-
latitude : 23.664009645581245
Longitude : 87.40676128305495
file name : Image_22112023091408197.png
|
2023-11-22 09:14:08.284173 |
76 |
67383742 |
Water Supply to villages |
349925 |
Water Supply to villages1 |
Roof laid |
-
latitude : 23.61221451
Longitude : 87.38847672
file name : Image_26122023115814146.png
|
2023-12-26 11:58:14.11319 |
77 |
67383742 |
Water Supply to villages |
349925 |
Water Supply to villages1 |
Plinth level |
-
latitude : 23.61227854
Longitude : 87.38855855
file name : Image_26122023115557561.png
|
2023-12-26 11:55:57.632985 |
78 |
67383742 |
Water Supply to villages |
349925 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.65115762
Longitude : 87.39908853
file name : Image_26122023115313663.png
|
2023-12-26 11:53:11.973609 |
79 |
67383821 |
Water Supply to villages |
349925 |
Water Supply to villages1 |
Roof laid |
-
latitude : 23.65026592
Longitude : 87.39699184
file name : Image_16122023192441409.png
|
2023-12-16 19:24:41.486777 |
80 |
67383821 |
Water Supply to villages |
349925 |
Water Supply to villages1 |
Plinth level |
-
latitude : 23.65022734
Longitude : 87.3969164
file name : Image_16122023192147569.png
|
2023-12-16 19:21:47.632562 |
81 |
67383821 |
Water Supply to villages |
349925 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.63164202
Longitude : 87.40128379
file name : Image_16122023081656921.png
|
2023-12-16 08:16:56.984787 |
82 |
58238386 |
RENOVATION OF GP MEETTING HALL AND GP OFFICE BUILDING |
255372 |
RENOVATION OF GP MEETTING HALL AND GP OFFICE BUILDING1 |
Plinth level |
-
latitude : 23.6257351
Longitude : 87.406546
file name : Image_09072024134558592.png
|
2024-07-09 13:45:58.64916 |
83 |
58238386 |
RENOVATION OF GP MEETTING HALL AND GP OFFICE BUILDING |
255372 |
RENOVATION OF GP MEETTING HALL AND GP OFFICE BUILDING1 |
Completion of work |
-
latitude : 23.6257221
Longitude : 87.4065444
file name : Image_08112023130609449.png
|
2023-11-08 13:06:09.550783 |
84 |
67352893 |
Construction of roads |
251895 |
Construction of roads1 |
Plinth level |
-
latitude : 23.64954084623605,23.649340476840734
Longitude : 87.40505196154118,87.40499781444669
file name : Image_22112023170844719.png
|
2023-11-22 17:08:44.832645 |
85 |
67352893 |
Construction of roads |
251895 |
Construction of roads1 |
Completion of work |
-
latitude : 23.66603986825794,23.66642929147929
Longitude : 87.39270457997918,87.39230065606534
file name : Image_22112023085232195.png
|
2023-11-22 08:52:32.278445 |
86 |
67352893 |
Construction of roads |
251895 |
Construction of roads1 |
Completion of work |
-
latitude : 23.666410893201828,23.666046406142414
Longitude : 87.39232202991843,87.392698796466
file name : Image_22112023084701890.png
|
2023-11-22 08:47:01.970251 |
87 |
67352893 |
Construction of roads |
251895 |
Construction of roads1 |
Completion of work |
-
latitude : 23.666375395841897,23.665983458049595
Longitude : 87.39228129386902,87.39268253557384
file name : Image_21112023084402868.png
|
2023-11-21 08:44:02.945009 |
88 |
67383622 |
Providing piped water supply to public institutions |
699156 |
Providing piped water supply to public institutions1 |
Roof laid |
-
latitude : 23.650387418456376,23.650158047676086
Longitude : 87.39721421152353,87.39712259732187
file name : Image_29112023192644963.png
|
2023-11-29 19:26:45.179235 |
89 |
67383622 |
Providing piped water supply to public institutions |
699156 |
Providing piped water supply to public institutions1 |
Plinth level |
-
latitude : 23.65036876872182,23.65020293276757
Longitude : 87.39714187569916,87.3971728887409
file name : Image_29112023191835229.png
|
2023-11-29 19:18:35.399467 |
90 |
67383622 |
Providing piped water supply to public institutions |
699156 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 23.663258920423687,23.663988732732832,23.664420903660357,23.664824618026614
Longitude : 87.40660093724728,87.40679464302957,87.40695213899016,87.40716244094074
file name : Image_21112023085550939.png
|
2023-11-21 08:55:51.021926 |
91 |
67384254 |
Creation of drainage channel for management of grey water |
249939 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.6341185
Longitude : 87.4225598
file name : Image_20122023131636493.png
|
2023-12-20 13:16:36.58109 |
92 |
67384254 |
Creation of drainage channel for management of grey water |
249939 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.6341179
Longitude : 87.4225574
file name : Image_20122023123730453.png
|
2023-12-20 12:37:30.525945 |
93 |
67384254 |
Creation of drainage channel for management of grey water |
249939 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.677609493024647
Longitude : 87.39538972266018
file name : Image_22112023083046698.png
|
2023-11-22 08:30:46.806462 |
94 |
67384254 |
Creation of drainage channel for management of grey water |
249939 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.6775895440951
Longitude : 87.3950039036572
file name : Image_22112023082745604.png
|
2023-11-22 08:27:45.689768 |
95 |
67384254 |
Creation of drainage channel for management of grey water |
249939 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.67755291517824
Longitude : 87.39504178985953
file name : Image_21112023080124488.png
|
2023-11-21 08:01:24.584192 |
96 |
57938040 |
VECTOR BORNE DISEASES CONTROL PERPOSE SANITATION EXTENCES AT GP AREA |
50000 |
VECTOR BORNE DISEASES CONTROL PERPOSE SANITATION EXTENCES AT GP AREA1 |
Completion of work |
-
latitude : 23.64950857590884,23.64953196141869,23.650114461779594
Longitude : 87.39683082327247,87.39679235033691,87.3970795981586
file name : Image_13102023081147079.png
|
2023-10-13 08:11:47.193092 |
97 |
57939870 |
CONSTRUCTION OF BATHING GHAT FOR WOMEN BESIDE SAHAPARA BHAIRAB MANDIR POND AT BASUDEBPUR |
248974 |
CONSTRUCTION OF BATHING GHAT FOR WOMEN BESIDE SAHAPARA BHAIRAB MANDIR POND AT BASUDEBPUR1 |
Roof laid |
-
latitude : 23.6257483
Longitude : 87.4065301
file name : Image_07022024120840352.png
|
2024-02-07 12:08:40.431357 |
98 |
57939870 |
CONSTRUCTION OF BATHING GHAT FOR WOMEN BESIDE SAHAPARA BHAIRAB MANDIR POND AT BASUDEBPUR |
248974 |
CONSTRUCTION OF BATHING GHAT FOR WOMEN BESIDE SAHAPARA BHAIRAB MANDIR POND AT BASUDEBPUR1 |
Plinth level |
-
latitude : 23.62570229
Longitude : 87.40650919
file name : Image_07022024114937844.png
|
2024-02-07 11:49:37.922568 |
99 |
57939870 |
CONSTRUCTION OF BATHING GHAT FOR WOMEN BESIDE SAHAPARA BHAIRAB MANDIR POND AT BASUDEBPUR |
248974 |
CONSTRUCTION OF BATHING GHAT FOR WOMEN BESIDE SAHAPARA BHAIRAB MANDIR POND AT BASUDEBPUR1 |
Completion of work |
-
latitude : 23.66772516
Longitude : 87.3908794
file name : Image_07022024105852452.png
|
2024-02-07 10:58:52.532701 |
100 |
66485064 |
Construction of toilets in public institutions |
321769 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.6257423
Longitude : 87.4065409
file name : Image_09072024144750307.png
|
2024-07-09 14:47:50.361 |
101 |
66485064 |
Construction of toilets in public institutions |
321769 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.649532003328204
Longitude : 87.39988720044494
file name : Image_09102023114834319.png
|
2023-10-09 11:48:34.438317 |
102 |
87496338 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.6257425
Longitude : 87.4065419
file name : Image_09072024144606966.png
|
2024-07-09 14:46:07.025779 |
103 |
87496338 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.671253747306764
Longitude : 87.40974674932659
file name : Image_11102023171243053.png
|
2023-10-11 17:12:43.132417 |
104 |
67356391 |
Construction of roads |
262348 |
Construction of roads1 |
Plinth level |
-
latitude : 23.61470406409353,23.614748152904212
Longitude : 87.43873204104602,87.43768438696861
file name : Image_22112023123257832.png
|
2023-11-22 12:32:57.923881 |
105 |
67356391 |
Construction of roads |
262348 |
Construction of roads1 |
Plinth level |
-
latitude : 23.61480401828885,23.61471923533827
Longitude : 87.43774708360434,87.43872391059995
file name : Image_22112023122941695.png
|
2023-11-22 12:29:41.785936 |
106 |
67356391 |
Construction of roads |
262348 |
Construction of roads1 |
Completion of work |
-
latitude : 23.614763491787016,23.614684701897204
Longitude : 87.43773182854056,87.43869826197624
file name : Image_21112023104114407.png
|
2023-11-21 10:41:14.503837 |
107 |
67384704 |
Repair of drainage channel |
150000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 23.6261313
Longitude : 87.4061093
file name : Image_10012024142502659.png
|
2024-01-10 14:25:02.736327 |
108 |
67384704 |
Repair of drainage channel |
150000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 23.625785
Longitude : 87.4065321
file name : Image_10012024142224970.png
|
2024-01-10 14:22:25.045353 |
109 |
67380557 |
Creation of a new source of drinking water |
349925 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.6257116
Longitude : 87.4065682
file name : Image_22112023141137027.png
|
2023-11-22 14:11:37.121892 |
110 |
67380557 |
Creation of a new source of drinking water |
349925 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.687546574510634
Longitude : 87.39881934598088
file name : Image_22112023081539465.png
|
2023-11-22 08:15:39.57777 |
111 |
67380557 |
Creation of a new source of drinking water |
349925 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.68753953371197
Longitude : 87.39883468486369
file name : Image_22112023081042550.png
|
2023-11-22 08:10:42.648254 |
112 |
67380557 |
Creation of a new source of drinking water |
349925 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.687367076054215
Longitude : 87.3987995646894
file name : Image_21112023075000813.png
|
2023-11-21 07:50:00.886573 |
113 |
67384291 |
Creation of drainage channel for management of grey water |
108187 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.62573647
Longitude : 87.40660143
file name : Image_24012024150009009.png
|
2024-01-24 15:00:09.099197 |
114 |
67384291 |
Creation of drainage channel for management of grey water |
108187 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.62572768
Longitude : 87.40659393
file name : Image_24012024145159538.png
|
2024-01-24 14:51:59.674607 |
115 |
67384291 |
Creation of drainage channel for management of grey water |
108187 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.671641368418932
Longitude : 87.38969380035996
file name : Image_22112023083937212.png
|
2023-11-22 08:39:37.288088 |
116 |
67384291 |
Creation of drainage channel for management of grey water |
108187 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.671454871073365
Longitude : 87.38998465240002
file name : Image_22112023083715809.png
|
2023-11-22 08:37:15.882917 |
117 |
67384291 |
Creation of drainage channel for management of grey water |
108187 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.671610271558166
Longitude : 87.3897195328027
file name : Image_21112023084358904.png
|
2023-11-21 08:43:58.981319 |
118 |
67384389 |
Creation of drainage channel for management of grey water |
259096 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.650586823932827
Longitude : 87.3972886428237
file name : Image_29112023191251553.png
|
2023-11-29 19:12:51.794706 |
119 |
67384389 |
Creation of drainage channel for management of grey water |
259096 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.657135856337845
Longitude : 87.3967912606895
file name : Image_22112023105829372.png
|
2023-11-22 10:58:29.460917 |
120 |
67384389 |
Creation of drainage channel for management of grey water |
259096 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.656903887167573
Longitude : 87.39651507698
file name : Image_22112023090210431.png
|
2023-11-22 09:02:10.511541 |
121 |
67384389 |
Creation of drainage channel for management of grey water |
259096 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.657222189940512
Longitude : 87.39690206944942
file name : Image_22112023085856320.png
|
2023-11-22 08:58:56.401283 |
122 |
67384389 |
Creation of drainage channel for management of grey water |
259096 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.657189877703786
Longitude : 87.39694808609784
file name : Image_21112023084411659.png
|
2023-11-21 08:44:11.747669 |
123 |
67384389 |
Creation of drainage channel for management of grey water |
259096 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.657189877703786
Longitude : 87.39694808609784
file name : Image_21112023084407733.png
|
2023-11-21 08:44:07.816538 |
124 |
67379798 |
Procurement of Computer |
60000 |
Procurement of Computer1 |
|
-
latitude : 23.6257146
Longitude : 87.4065681
file name : Image_23112023135041563.png
|
2023-11-23 13:50:41.660756 |
125 |
47515901 |
Construction of Concrete drain from Shyamapada Pal door to Bamapada Dome Land at Kanchanpur |
259309 |
Construction of Concrete drain from Shyamapada Pal door to Bamapada Dome Land at Kanchanpur1 |
Roof laid |
-
latitude : 23.67613788228482,23.676247685216367
Longitude : 87.3936259187758,87.39395599812269
file name : Image_11042023164455900.png
|
2023-04-11 16:44:56.018052 |
126 |
47605778 |
Construction of concrete drain from Manasa Mandir Door to Goipota Land at Dandeswar |
136447 |
Construction of concrete drain from Manasa Mandir Door to Goipota Land at Dandeswar1 |
Roof laid |
-
latitude : 23.652169830165803,23.65163749549538
Longitude : 87.39754613488913,87.39794192835689
file name : Image_17042023085351610.png
|
2023-04-17 08:53:51.698581 |
127 |
47606656 |
Construction of concrete drain from Budhan Hembram door towords Sotadanga land at Fuljhore |
188170 |
Construction of concrete drain from Budhan Hembram door towords Sotadanga land at Fuljhore1 |
Roof laid |
-
latitude : 23.6312913056463,23.631000202149153
Longitude : 87.38796737976372,87.38823660649359
file name : Image_22052023172203465.png
|
2023-05-22 17:22:03.558862 |
128 |
47606836 |
Construction of Concrete drain from Shibpur Bypass road to Mithun Bagdi Land |
168900 |
Construction of Concrete drain from Shibpur Bypass road to Mithun Bagdi Land1 |
Roof laid |
-
latitude : 23.63015258219093,23.630353244952857
Longitude : 87.40241124294698,87.40172543562949
file name : Image_23042023094620623.png
|
2023-04-23 09:46:20.729906 |
129 |
47144099 |
Construction of concrete Road from Mor Bagdi door to Bodhan Bagdi door at Dandeshwar |
82845 |
Construction of concrete Road from Mor Bagdi door to Bodhan Bagdi door at Dandeshwar1 |
Roof laid |
-
latitude : 23.65254764445126,23.652356956154108
Longitude : 87.39822657778859,87.39778275601566
file name : Image_21022023161349323.png
|
2023-02-21 16:13:49.420588 |
130 |
47144540 |
Construction of Passenger Waiting Room at Krishnapur veichle stand |
209449 |
Construction of Passenger Waiting Room at Krishnapur veichle stand 1 |
Roof laid |
-
latitude : 23.634502915665507
Longitude : 87.4228820297867
file name : Image_28042023072348373.png
|
2023-04-28 07:23:48.493147 |
131 |
58240173 |
CONSTRUCTION OF CONCRETE ROAD FROM GOSAI BANDH TOWORDS IMAM ASTHANA AT JATGORIA |
349205 |
CONSTRUCTION OF CONCRETE ROAD FROM GOSAI BANDH TOWORDS IMAM ASTHANA AT JATGORIA1 |
Roof laid |
-
latitude : 23.615706958808005,23.61494768410921
Longitude : 87.38959304988384,87.38926640711725
file name : Image_16032023122636193.png
|
2023-03-16 12:26:36.363728 |
132 |
47205904 |
Installation of Submersible at Binodpur |
350000 |
Installation of Submersible at Binodpur1 |
Roof laid |
-
latitude : 23.6257078
Longitude : 87.4065586
file name : Image_08122023162453060.png
|
2023-12-08 16:24:53.130469 |
133 |
47205904 |
Installation of Submersible at Binodpur |
350000 |
Installation of Submersible at Binodpur1 |
Plinth level |
-
latitude : 23.62582434
Longitude : 87.40660603
file name : Image_08122023162205608.png
|
2023-12-08 16:22:05.680634 |
134 |
47205904 |
Installation of Submersible at Binodpur |
350000 |
Installation of Submersible at Binodpur1 |
Completion of work |
-
latitude : 23.66683409549296
Longitude : 87.39800713956356
file name : Image_02022023084338470.png
|
2023-02-02 08:43:38.589885 |
135 |
47144654 |
Construction of Concrete Road from Sk.Gopi door to Abukalam door at Jatgoria |
200000 |
Construction of Concrete Road from Sk.Gopi door to Abukalam door at Jatgoria1 |
Roof laid |
-
latitude : 23.6257163,23.6257155
Longitude : 87.40655,87.4065648
file name : Image_08122023141602156.png
|
2023-12-08 14:16:02.261781 |
136 |
47144654 |
Construction of Concrete Road from Sk.Gopi door to Abukalam door at Jatgoria |
200000 |
Construction of Concrete Road from Sk.Gopi door to Abukalam door at Jatgoria1 |
Plinth level |
-
latitude : 23.65031604655087,23.6257204
Longitude : 87.39700952544808,87.4065605
file name : Image_08122023141112792.png
|
2023-12-08 14:11:12.891403 |
137 |
47144654 |
Construction of Concrete Road from Sk.Gopi door to Abukalam door at Jatgoria |
200000 |
Construction of Concrete Road from Sk.Gopi door to Abukalam door at Jatgoria1 |
Completion of work |
-
latitude : 23.616155767813325,23.61672745551914
Longitude : 87.38919742405415,87.38888310268521
file name : Image_09022023152228293.png
|
2023-02-09 15:22:28.41199 |
138 |
47144434 |
Construction of concrete road from Radhanagar Main Road to Swapan Bagdi door at Nabagram |
200000 |
Construction of concrete road from Radhanagar Main Road to Swapan Bagdi door at Nabagram1 |
Plinth level |
-
latitude : 23.625718,23.6257164
Longitude : 87.4065656,87.4065181
file name : Image_08122023142144325.png
|
2023-12-08 14:21:44.432108 |
139 |
47144434 |
Construction of concrete road from Radhanagar Main Road to Swapan Bagdi door at Nabagram |
200000 |
Construction of concrete road from Radhanagar Main Road to Swapan Bagdi door at Nabagram1 |
Completion of work |
-
latitude : 23.631179,23.63092019688338
Longitude : 87.4131595,87.42204425856471
file name : Image_17022023110320441.png
|
2023-02-17 11:03:20.547942 |
140 |
47144693 |
Construction of Concrete Road from Jambon ICDS centre to Shibpur-Kantaberia pich Road |
274755 |
Construction of Concrete Road from Jambon ICDS centre to Shibpur-Kantaberia pich Road 1 |
Roof laid |
-
latitude : 23.612863565795124,23.61230776179582
Longitude : 87.37572443671525,87.37532252445817
file name : Image_12072022065037898.png
|
2022-07-12 06:50:38.010274 |
141 |
47606186 |
Construction of concrete drain from dharam bagdi door towords Babur Bandh at Rajhat |
349000 |
Construction of concrete drain from dharam bagdi door towords Babur Bandh at Rajhat1 |
Roof laid |
-
latitude : 23.6257118,23.62570664
Longitude : 87.4065724,87.40655234
file name : Image_08122023153245525.png
|
2023-12-08 15:32:45.602419 |
142 |
47606186 |
Construction of concrete drain from dharam bagdi door towords Babur Bandh at Rajhat |
349000 |
Construction of concrete drain from dharam bagdi door towords Babur Bandh at Rajhat1 |
Plinth level |
-
latitude : 23.6257062,23.62571239
Longitude : 87.406562,87.40654771
file name : Image_08122023152942142.png
|
2023-12-08 15:29:42.216836 |
143 |
47606186 |
Construction of concrete drain from dharam bagdi door towords Babur Bandh at Rajhat |
349000 |
Construction of concrete drain from dharam bagdi door towords Babur Bandh at Rajhat1 |
Completion of work |
-
latitude : 23.651730325073004,23.652064302004874
Longitude : 87.39603705704212,87.39465538412333
file name : Image_28122022104256578.png
|
2022-12-28 10:42:56.690161 |
144 |
47206508 |
Installation of Submersible at Shibpur |
350000 |
Installation of Submersible at Shibpur 1 |
Roof laid |
-
latitude : 23.62601482
Longitude : 87.40658806
file name : Image_08122023161453461.png
|
2023-12-08 16:14:53.541761 |
145 |
47206508 |
Installation of Submersible at Shibpur |
350000 |
Installation of Submersible at Shibpur 1 |
Plinth level |
-
latitude : 23.6257048
Longitude : 87.4065599
file name : Image_08122023161231661.png
|
2023-12-08 16:12:31.741668 |
146 |
47206508 |
Installation of Submersible at Shibpur |
350000 |
Installation of Submersible at Shibpur 1 |
Completion of work |
-
latitude : 23.628440662287176
Longitude : 87.41366822272539
file name : Image_02022023104939631.png
|
2023-02-02 10:49:39.755981 |
147 |
47205839 |
Installation of Submersible at Basudebpur |
350000 |
Installation of Submersible at Basudebpur1 |
Roof laid |
-
latitude : 23.6257083
Longitude : 87.406561
file name : Image_08122023160335689.png
|
2023-12-08 16:03:35.769827 |
148 |
47205839 |
Installation of Submersible at Basudebpur |
350000 |
Installation of Submersible at Basudebpur1 |
Plinth level |
-
latitude : 23.62579452
Longitude : 87.40655672
file name : Image_08122023160122513.png
|
2023-12-08 16:01:22.60548 |
149 |
47205839 |
Installation of Submersible at Basudebpur |
350000 |
Installation of Submersible at Basudebpur1 |
Completion of work |
-
latitude : 23.670793161727488
Longitude : 87.40288079716265
file name : Image_02022023085420264.png
|
2023-02-02 08:54:20.377708 |
150 |
47144355 |
Construction of concrete Road with Drain from Abhijit Mukherjee door to Sukanta Lohar poultry firm a |
348821 |
Construction of concrete Road with Drain from Abhijit Mukherjee door to Sukanta Lohar poultry firm a1 |
Roof laid |
-
latitude : 23.6257109,23.62571037
Longitude : 87.406572,87.4065605
file name : Image_08122023160711238.png
|
2023-12-08 16:07:11.32167 |
151 |
47144355 |
Construction of concrete Road with Drain from Abhijit Mukherjee door to Sukanta Lohar poultry firm a |
348821 |
Construction of concrete Road with Drain from Abhijit Mukherjee door to Sukanta Lohar poultry firm a1 |
Roof laid |
-
latitude : 23.625701,23.62575803
Longitude : 87.4065709,87.40657091
file name : Image_08122023160221963.png
|
2023-12-08 16:02:22.039681 |
152 |
47144355 |
Construction of concrete Road with Drain from Abhijit Mukherjee door to Sukanta Lohar poultry firm a |
348821 |
Construction of concrete Road with Drain from Abhijit Mukherjee door to Sukanta Lohar poultry firm a1 |
Roof laid |
-
latitude : 23.6257098,23.62572539
Longitude : 87.4065754,87.40655345
file name : Image_08122023155913276.png
|
2023-12-08 15:59:13.337048 |
153 |
47144355 |
Construction of concrete Road with Drain from Abhijit Mukherjee door to Sukanta Lohar poultry firm a |
348821 |
Construction of concrete Road with Drain from Abhijit Mukherjee door to Sukanta Lohar poultry firm a1 |
Roof laid |
-
latitude : 23.635258795693517,23.634772184304893
Longitude : 87.3841024003923,87.3848344758153
file name : Image_25012023162436448.png
|
2023-01-25 16:24:36.547262 |
154 |
47144029 |
Construction of concrete Road from Manasa Mandir to Budhan Dome at Shashipur |
150000 |
Construction of concrete Road from Manasa Mandir to Budhan Dome at Shashipur1 |
Plinth level |
-
latitude : 23.62579,23.6257391
Longitude : 87.4065169,87.4065262
file name : Image_08122023142219529.png
|
2023-12-08 14:22:19.651579 |
155 |
47144029 |
Construction of concrete Road from Manasa Mandir to Budhan Dome at Shashipur |
150000 |
Construction of concrete Road from Manasa Mandir to Budhan Dome at Shashipur1 |
Plinth level |
-
latitude : 23.62579,23.6257391
Longitude : 87.4065169,87.4065262
file name : Image_08122023142211055.png
|
2023-12-08 14:22:11.168626 |
156 |
47144029 |
Construction of concrete Road from Manasa Mandir to Budhan Dome at Shashipur |
150000 |
Construction of concrete Road from Manasa Mandir to Budhan Dome at Shashipur1 |
Completion of work |
-
latitude : 23.660155017860234,23.660016590729356
Longitude : 87.39688823930919,87.39624031819403
file name : Image_24012023104915131.png
|
2023-01-24 10:49:15.246475 |
157 |
47206387 |
Installation of Submersible at Sundipur |
350000 |
Installation of Submersible at Sundipur1 |
Plinth level |
-
latitude : 23.625715
Longitude : 87.4065651
file name : Image_08122023145248875.png
|
2023-12-08 14:52:48.981351 |
158 |
47206387 |
Installation of Submersible at Sundipur |
350000 |
Installation of Submersible at Sundipur1 |
Completion of work |
-
latitude : 23.672574567608535
Longitude : 87.40824345499277
file name : Image_29122022120633617.png
|
2022-12-29 12:06:33.734791 |
159 |
47144619 |
Construction of Concrete Road from Namopara Suryapada Gorai door to Hanif door at Jatgoria |
200000 |
Construction of Concrete Road from Namopara Suryapada Gorai door to Hanif door at Jatgoria1 |
Roof laid |
-
latitude : 23.6257115,23.6257133
Longitude : 87.4065711,87.4065627
file name : Image_08122023152523844.png
|
2023-12-08 15:25:23.922482 |
160 |
47144619 |
Construction of Concrete Road from Namopara Suryapada Gorai door to Hanif door at Jatgoria |
200000 |
Construction of Concrete Road from Namopara Suryapada Gorai door to Hanif door at Jatgoria1 |
Plinth level |
-
latitude : 23.6257091,23.6257225
Longitude : 87.4065619,87.4065712
file name : Image_08122023152355777.png
|
2023-12-08 15:23:55.85723 |
161 |
47144619 |
Construction of Concrete Road from Namopara Suryapada Gorai door to Hanif door at Jatgoria |
200000 |
Construction of Concrete Road from Namopara Suryapada Gorai door to Hanif door at Jatgoria1 |
Completion of work |
-
latitude : 23.615612369030714,23.615660732612014
Longitude : 87.39111662842333,87.39083206281066
file name : Image_09022023150736645.png
|
2023-02-09 15:07:36.734994 |
162 |
47515968 |
Construction of Concrete drain from Grihoni Dome door to Arun Dome Land at Kanchanpur |
287866 |
Construction of Concrete drain from Grihoni Dome door to Arun Dome Land at Kanchanpur1 |
Roof laid |
-
latitude : 23.678594953380525,23.679331513121724
Longitude : 87.39427124150097,87.39367051050067
file name : Image_31012023145941206.png
|
2023-01-31 14:59:41.322087 |
163 |
67384478 |
Creation of drainage channel for management of grey water |
190526 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.62569395
Longitude : 87.40655841
file name : Image_18042024142231209.png
|
2024-04-18 14:22:31.27876 |
164 |
67384478 |
Creation of drainage channel for management of grey water |
190526 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.6257404
Longitude : 87.40654757
file name : Image_18042024141615613.png
|
2024-04-18 14:16:15.689576 |
165 |
67384478 |
Creation of drainage channel for management of grey water |
190526 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.6257404
Longitude : 87.40654757
file name : Image_18042024141607415.png
|
2024-04-18 14:16:07.492861 |
166 |
67384478 |
Creation of drainage channel for management of grey water |
190526 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.63597169
Longitude : 87.38579603
file name : Image_23022024131254139.png
|
2024-02-23 13:12:54.225073 |
167 |
67356663 |
Installation of Computer with Internet facility |
60000 |
Installation of Computer with Internet facility1 |
Plinth level |
-
latitude : 23.625757
Longitude : 87.4065396
file name : Image_21122023115906721.png
|
2023-12-21 11:59:06.793903 |
168 |
67356663 |
Installation of Computer with Internet facility |
60000 |
Installation of Computer with Internet facility1 |
Completion of work |
-
latitude : 23.625757
Longitude : 87.4065396
file name : Image_21122023115548184.png
|
2023-12-21 11:55:48.257009 |
169 |
67380084 |
Repairing/Construction of Building |
999111 |
Repairing/Construction of Building1 |
Roof laid |
-
latitude : 23.6257502
Longitude : 87.4065503
file name : Image_14032024155824369.png
|
2024-03-14 15:58:24.432091 |
170 |
67380084 |
Repairing/Construction of Building |
999111 |
Repairing/Construction of Building1 |
Plinth level |
-
latitude : 23.63574677
Longitude : 87.42418155
file name : Image_23022024122350629.png
|
2024-02-23 12:23:50.706478 |
171 |
67380084 |
Repairing/Construction of Building |
999111 |
Repairing/Construction of Building1 |
Completion of work |
-
latitude : 23.6351624
Longitude : 87.4232257
file name : Image_05022024161054828.png
|
2024-02-05 16:10:54.914082 |
172 |
67380084 |
Repairing/Construction of Building |
999111 |
Repairing/Construction of Building1 |
Completion of work |
-
latitude : 23.63578191
Longitude : 87.42412036
file name : Image_28122023105759752.png
|
2023-12-28 10:57:59.83365 |
173 |
87496382 |
COLOUR WORK FOR BIDBIHAR GP BOUNDARY WALL AT GP PREMISES |
49897 |
COLOUR WORK FOR BIDBIHAR GP BOUNDARY WALL AT GP PREMISES1 |
Roof laid |
-
latitude : 23.62593792
Longitude : 87.40670343
file name : Image_26042024153043755.png
|
2024-04-26 15:30:43.83165 |
174 |
87496382 |
COLOUR WORK FOR BIDBIHAR GP BOUNDARY WALL AT GP PREMISES |
49897 |
COLOUR WORK FOR BIDBIHAR GP BOUNDARY WALL AT GP PREMISES1 |
Plinth level |
-
latitude : 23.6257457
Longitude : 87.4065448
file name : Image_26042024152657647.png
|
2024-04-26 15:26:57.726978 |
175 |
87496382 |
COLOUR WORK FOR BIDBIHAR GP BOUNDARY WALL AT GP PREMISES |
49897 |
COLOUR WORK FOR BIDBIHAR GP BOUNDARY WALL AT GP PREMISES1 |
Completion of work |
-
latitude : 23.6257546
Longitude : 87.406552
file name : Image_26042024152049527.png
|
2024-04-26 15:20:49.593906 |
176 |
67384564 |
Creation of drainage channel for management of grey water |
299444 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.6162649
Longitude : 87.38735658
file name : Image_03052024145738036.png
|
2024-05-03 14:57:38.120434 |
177 |
67384564 |
Creation of drainage channel for management of grey water |
299444 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.61629056
Longitude : 87.38732363
file name : Image_03052024145431959.png
|
2024-05-03 14:54:32.03284 |
178 |
67384564 |
Creation of drainage channel for management of grey water |
299444 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.6162925
Longitude : 87.38732069
file name : Image_03052024145058058.png
|
2024-05-03 14:50:58.146757 |
179 |
67356411 |
Construction of roads |
299983 |
Construction of roads1 |
Roof laid |
-
latitude : 23.67269796,23.67270575
Longitude : 87.4112551,87.41125161
file name : Image_12032024133636289.png
|
2024-03-12 13:36:36.365948 |
180 |
67356411 |
Construction of roads |
299983 |
Construction of roads1 |
Plinth level |
-
latitude : 23.67339214,23.67338776
Longitude : 87.41163201,87.41166425
file name : Image_12032024133312468.png
|
2024-03-12 13:33:12.538345 |
181 |
67356411 |
Construction of roads |
299983 |
Construction of roads1 |
Completion of work |
-
latitude : 23.67265906,23.67343046
Longitude : 87.41121214,87.41160934
file name : Image_12032024132705133.png
|
2024-03-12 13:27:05.19987 |
182 |
67384582 |
Creation of drainage channel for management of grey water |
146411 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.65224576
Longitude : 87.39822618
file name : Image_21052024171433139.png
|
2024-05-21 17:14:33.206342 |
183 |
67384582 |
Creation of drainage channel for management of grey water |
146411 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.65221902
Longitude : 87.3982537
file name : Image_21052024171111879.png
|
2024-05-21 17:11:11.945697 |
184 |
67384582 |
Creation of drainage channel for management of grey water |
146411 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.65219485
Longitude : 87.39822056
file name : Image_21052024170658807.png
|
2024-05-21 17:06:58.87563 |
185 |
67384456 |
Creation of drainage channel for management of grey water |
148316 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.6476603
Longitude : 87.4044327
file name : Image_21052024164149200.png
|
2024-05-21 16:41:49.263562 |
186 |
67384456 |
Creation of drainage channel for management of grey water |
148316 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.6476549
Longitude : 87.4043503
file name : Image_21052024163901311.png
|
2024-05-21 16:39:01.384819 |
187 |
67384456 |
Creation of drainage channel for management of grey water |
148316 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.64745422
Longitude : 87.40391493
file name : Image_28022024120837766.png
|
2024-02-28 12:08:37.843359 |
188 |
58714904 |
CONSTRUCTION OF CC DRAIN WITH COVER FROM BHAGIRATH LOHAR DOOR TO SHIBPUR BYPASS MAIN DRAIN AT SHIBPU |
348548 |
CONSTRUCTION OF CC DRAIN WITH COVER FROM BHAGIRATH LOHAR DOOR TO SHIBPUR BYPASS MAIN DRAIN AT SHIBPU1 |
Roof laid |
-
latitude : 23.624742776155472,23.625350170768797
Longitude : 87.40401218645275,87.40508699789643
file name : Image_10032023125618329.png
|
2023-03-10 12:56:18.44998 |
189 |
57730495 |
INSTALLATION OF SOLAR SUBMERSIBLE WITH DRAINAGE AT THAKURANIBAZAR VILLAGE OF SANSAD VII |
349899 |
INSTALLATION OF SOLAR SUBMERSIBLE WITH DRAINAGE AT THAKURANIBAZAR VILLAGE OF SANSAD VII1 |
Roof laid |
-
latitude : 23.649087511003017
Longitude : 87.4110100697726
file name : Image_10042023214131301.png
|
2023-04-10 21:41:31.447952 |
190 |
87496300 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.6257347
Longitude : 87.4065465
file name : Image_09072024144457344.png
|
2024-07-09 14:44:57.40065 |
191 |
87496300 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.631109460256994
Longitude : 87.38211371004581
file name : Image_11102023165458677.png
|
2023-10-11 16:54:58.766212 |
192 |
87496326 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.6257435
Longitude : 87.4065452
file name : Image_09072024144532028.png
|
2024-07-09 14:45:32.08685 |
193 |
87496326 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.630104511976242
Longitude : 87.42040132172406
file name : Image_11102023165512607.png
|
2023-10-11 16:55:12.713451 |
194 |
87496326 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.630104511976242
Longitude : 87.42040132172406
file name : Image_11102023165502919.png
|
2023-10-11 16:55:03.045513 |
195 |
87496347 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.6257436
Longitude : 87.4065386
file name : Image_09072024144659726.png
|
2024-07-09 14:46:59.782423 |
196 |
87496347 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.65900187753141
Longitude : 87.39427233114839
file name : Image_11102023172701326.png
|
2023-10-11 17:27:01.456255 |
197 |
66486287 |
CONSTRUCTION OF FURENAL SHED AT RAJHAT VILLAGE |
97039 |
CONSTRUCTION OF FURENAL SHED AT RAJHAT VILLAGE1 |
Roof laid |
-
latitude : 23.6501156
Longitude : 87.4002055
file name : Image_09032023154244833.png
|
2023-03-09 15:42:44.930796 |
198 |
66486129 |
CONSTRUCTION OF FURENAL SHED AT NAYAKANCHANPUR VILLAGE |
99471 |
CONSTRUCTION OF FURENAL SHED AT NAYAKANCHANPUR VILLAGE1 |
Roof laid |
-
latitude : 23.681411985307932
Longitude : 87.40097483620048
file name : Image_28032023085540756.png
|
2023-03-28 08:55:40.849235 |
199 |
66486190 |
CONSTRUCTION OF FURENAL SHED AT BASUDEBPUR VILLAGE |
97039 |
CONSTRUCTION OF FURENAL SHED AT BASUDEBPUR VILLAGE1 |
Roof laid |
-
latitude : 23.670156598091125
Longitude : 87.39257114008069
file name : Image_18032023105115580.png
|
2023-03-18 10:51:15.696477 |
200 |
66486335 |
CONSTRUCTION OF FURENAL SHED AT PHULJHORE VILLAGE |
97039 |
CONSTRUCTION OF FURENAL SHED AT PHULJHORE VILLAGE1 |
Plinth level |
-
latitude : 23.633631700649858
Longitude : 87.38953093998134
file name : Image_10032023125623584.png
|
2023-03-10 12:56:23.713475 |
201 |
66486162 |
CONSTRUCTION OF FURENAL SHED AT KANCHANPUR VILLAGE |
99471 |
CONSTRUCTION OF FURENAL SHED AT KANCHANPUR VILLAGE1 |
Plinth level |
-
latitude : 23.67433028295636
Longitude : 87.39591174758971
file name : Image_10042023214211235.png
|
2023-04-10 21:42:11.362352 |
202 |
66486468 |
FENCING WORK INCLUDING GATE ALONG THE BOUNDARY LINE FOR SOLID WASTE MANAGMENT PROJECT AT KRISHNAPUR |
195525 |
FENCING WORK INCLUDING GATE ALONG THE BOUNDARY LINE FOR SOLID WASTE MANAGMENT PROJECT AT KRISHNAPUR1 |
Roof laid |
-
latitude : 23.636830528266728
Longitude : 87.42465279065073
file name : Image_03052023122712663.png
|
2023-05-03 12:27:12.777119 |
203 |
66485953 |
CONSTRUCTION OF STORE ROOM WITH KITCHEN SHED AT BASUDEBPUR COMMUNITY HALL |
528167 |
CONSTRUCTION OF STORE ROOM WITH KITCHEN SHED AT BASUDEBPUR COMMUNITY HALL1 |
Plinth level |
-
latitude : 23.67076449561864
Longitude : 87.38976865075529
file name : Image_09062023110914330.png
|
2023-06-09 11:09:14.432394 |
204 |
57940153 |
MAINTANANCE AND REPAIRING OF EXISTING COMMUNITY TOILET IN THE GP AREA |
115286 |
MAINTANANCE AND REPAIRING OF EXISTING COMMUNITY TOILET IN THE GP AREA1 |
Roof laid |
-
latitude : 23.633927791379392
Longitude : 87.4228199198842
file name : Image_22062023163050139.png
|
2023-06-22 16:30:50.245875 |
205 |
47515826 |
Construction of Concrete drain from Paritosh Ghosh Door to vacent land of Baul Ghosh at Nayakanchanp |
230005 |
Construction of Concrete drain from Paritosh Ghosh Door to vacent land of Baul Ghosh at Nayakanchanp1 |
Roof laid |
-
latitude : 23.6257019,23.6257087
Longitude : 87.4065683,87.4065757
file name : Image_08122023161022035.png
|
2023-12-08 16:10:22.105871 |
206 |
47515826 |
Construction of Concrete drain from Paritosh Ghosh Door to vacent land of Baul Ghosh at Nayakanchanp |
230005 |
Construction of Concrete drain from Paritosh Ghosh Door to vacent land of Baul Ghosh at Nayakanchanp1 |
Roof laid |
-
latitude : 23.681971351616085,23.682060996070504
Longitude : 87.3987284861505,87.39834719337523
file name : Image_11042023171440571.png
|
2023-04-11 17:14:40.679161 |
207 |
47143717 |
Construction of Boundary Wall at Kanchanpur Madhyabitto para ICDS center |
300000 |
Construction of Boundary Wall at Kanchanpur Madhyabitto para ICDS center1 |
Plinth level |
-
latitude : 23.65030892
Longitude : 87.39710386
file name : Image_09072024160054056.png
|
2024-07-09 16:00:54.11001 |
208 |
47143717 |
Construction of Boundary Wall at Kanchanpur Madhyabitto para ICDS center |
300000 |
Construction of Boundary Wall at Kanchanpur Madhyabitto para ICDS center1 |
Completion of work |
-
latitude : 23.678028085269034
Longitude : 87.39505369216204
file name : Image_20072023105059298.png
|
2023-07-20 10:50:59.409117 |
209 |
47144910 |
Office Maintanance and Management like Computer Printer Stationaries and Contigency |
60334 |
Office Maintanance and Management like Computer Printer Stationaries and Contigency1 |
Plinth level |
-
latitude : 23.6257351
Longitude : 87.4065455
file name : Image_10032022114505294.png
|
2022-03-10 11:45:05.397729 |
210 |
65167012 |
Operation & maintenance of drinking water supply system |
300000 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.6259509017691
Longitude : 87.40677645429969
file name : Image_21092022122426728.png
|
2022-09-21 12:24:26.823723 |
211 |
47206711 |
Maintanance & Repairing of Tube well at GP area |
250000 |
Maintanance & Repairing of Tube well at GP area1 |
Plinth level |
-
latitude : 23.625749
Longitude : 87.4065013
file name : Image_19042022131156123.png
|
2022-04-19 13:11:56.22722 |
212 |
65166910 |
Water Supply to villages |
620000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 23.6257339
Longitude : 87.4065227
file name : Image_23092022161619636.png
|
2022-09-23 16:16:19.711678 |
213 |
65166910 |
Water Supply to villages |
620000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 23.6257345
Longitude : 87.406518
file name : Image_23092022161359260.png
|
2022-09-23 16:13:59.33543 |
214 |
39038452 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT RAJHAT |
349730 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT RAJHAT1 |
Completion of work |
-
latitude : 23.63672043196857
Longitude : 87.42435204796493
file name : Image_11092023103623131.png
|
2023-09-11 10:36:23.232896 |
215 |
39038600 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT NABAGRAM |
398309 |
INSTALLATION OF NEW SUBMERSIBLE WITH SOLAR SYSTEM FOR AGRICULTUIRE PURPOSE AT NABAGRAM1 |
Completion of work |
-
latitude : 23.633336615748703
Longitude : 87.42014550603926
file name : Image_31032022122057762.png
|
2022-03-31 12:20:57.940505 |
216 |
39048451 |
CONS OF CC ROAD FROM SHUBHORANJAN MONDAL HOUSE TO ATUL BISWAS HOUSE AT AJOY PALLY |
248734 |
CONS OF CC ROAD FROM SHUBHORANJAN MONDAL HOUSE TO ATUL BISWAS HOUSE AT AJOY PALLY1 |
Roof laid |
-
latitude : 23.61601922661066,23.615351733751595
Longitude : 87.43389903567731,87.43317735381424
file name : Image_01032021152044864.png
|
2021-03-01 15:20:44.967399 |
217 |
67353056 |
Construction of roads |
297329 |
Construction of roads1 |
Plinth level |
-
latitude : 23.64867692347616,23.6494606314227
Longitude : 87.40449749864638,87.40504458546638
file name : Image_22112023093452428.png
|
2023-11-22 09:34:52.506863 |
218 |
67353056 |
Construction of roads |
297329 |
Construction of roads1 |
Plinth level |
-
latitude : 23.64952668081969,23.64926939830184
Longitude : 87.40515489131212,87.40493101067841
file name : Image_22112023093139551.png
|
2023-11-22 09:31:39.641094 |
219 |
67353056 |
Construction of roads |
297329 |
Construction of roads1 |
Completion of work |
-
latitude : 23.649499649181962,23.64865081384778
Longitude : 87.40514860488474,87.4045726004988
file name : Image_21112023090528130.png
|
2023-11-21 09:05:28.217546 |
220 |
67352929 |
Construction of roads |
85064 |
Construction of roads1 |
Plinth level |
-
latitude : 23.648719964548945,23.648890578188002
Longitude : 87.40452281199396,87.40463219583035
file name : Image_22112023171136002.png
|
2023-11-22 17:11:36.098132 |
221 |
67352929 |
Construction of roads |
85064 |
Construction of roads1 |
Completion of work |
-
latitude : 23.658907958306372,23.65893255919218
Longitude : 87.39348099566996,87.39371937699616
file name : Image_06102023102154352.png
|
2023-10-06 10:21:54.453504 |
222 |
67353078 |
Construction of roads |
178816 |
Construction of roads1 |
Plinth level |
-
latitude : 23.64845333620906,23.648267383687198
Longitude : 87.40152326412499,87.40200564265251
file name : Image_22112023094042156.png
|
2023-11-22 09:40:42.243186 |
223 |
67353078 |
Construction of roads |
178816 |
Construction of roads1 |
Plinth level |
-
latitude : 23.648099075071514,23.64830346778035
Longitude : 87.40227746777236,87.40193699486554
file name : Image_22112023093813913.png
|
2023-11-22 09:38:13.999165 |
224 |
67353078 |
Construction of roads |
178816 |
Construction of roads1 |
Completion of work |
-
latitude : 23.648228030651808,23.648578519932926
Longitude : 87.40229213610291,87.4015610665083
file name : Image_09102023123444189.png
|
2023-10-09 12:34:44.2856 |
225 |
67384358 |
Creation of drainage channel for management of grey water |
299630 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.6257466
Longitude : 87.4065639
file name : Image_18042024142132817.png
|
2024-04-18 14:21:32.890924 |
226 |
67384358 |
Creation of drainage channel for management of grey water |
299630 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.6257433
Longitude : 87.4065619
file name : Image_18042024141604634.png
|
2024-04-18 14:16:04.707946 |
227 |
67384358 |
Creation of drainage channel for management of grey water |
299630 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.66203497
Longitude : 87.39511267
file name : Image_23022024115845769.png
|
2024-02-23 11:58:45.864058 |
228 |
90702475 |
Construction of roads |
113647 |
Construction of roads1 |
Roof laid |
-
latitude : 23.67228733,23.67207724
Longitude : 87.3902672,87.39015513
file name : Image_29092024083648489.png
|
2024-09-29 08:36:48.540291 |
229 |
90702475 |
Construction of roads |
113647 |
Construction of roads1 |
Plinth level |
-
latitude : 23.67227974,23.67201727
Longitude : 87.3902484,87.39016124
file name : Image_29092024083217295.png
|
2024-09-29 08:32:17.353716 |
230 |
90702475 |
Construction of roads |
113647 |
Construction of roads1 |
Plinth level |
-
latitude : 23.67230751,23.67191711
Longitude : 87.39023128,87.39010235
file name : Image_23082024121351673.png
|
2024-08-23 12:13:51.726565 |
231 |
90702475 |
Construction of roads |
113647 |
Construction of roads1 |
Completion of work |
-
latitude : 23.67222251,23.67189966
Longitude : 87.39025109,87.39011468
file name : Image_18072024175423879.png
|
2024-07-18 17:54:23.934161 |
232 |
90722344 |
Construction of roads |
113648 |
Construction of roads1 |
Roof laid |
-
latitude : 23.65022333,23.65026596
Longitude : 87.40002557,87.40003447
file name : Image_29092024090803705.png
|
2024-09-29 09:08:03.766514 |
233 |
90722344 |
Construction of roads |
113648 |
Construction of roads1 |
Plinth level |
-
latitude : 23.65059828,23.6505216
Longitude : 87.40009865,87.40012896
file name : Image_29092024090429849.png
|
2024-09-29 09:04:29.908327 |
234 |
90722344 |
Construction of roads |
113648 |
Construction of roads1 |
Plinth level |
-
latitude : 23.65068432,23.65022809
Longitude : 87.40015911,87.40002262
file name : Image_22072024165049588.png
|
2024-07-22 16:50:49.651806 |
235 |
90722344 |
Construction of roads |
113648 |
Construction of roads1 |
Completion of work |
-
latitude : 23.65058734,23.65015188
Longitude : 87.40010169,87.40003505
file name : Image_20072024104433101.png
|
2024-07-20 10:44:33.161127 |
236 |
90701862 |
Construction of roads |
113647 |
Construction of roads1 |
Roof laid |
-
latitude : 23.66848683,23.66853315
Longitude : 87.39351639,87.39332123
file name : Image_29092024084415244.png
|
2024-09-29 08:44:15.290027 |
237 |
90701862 |
Construction of roads |
113647 |
Construction of roads1 |
Plinth level |
-
latitude : 23.66854892,23.6686605
Longitude : 87.39349395,87.39279979
file name : Image_23082024135309979.png
|
2024-08-23 13:53:10.062876 |
238 |
90701862 |
Construction of roads |
113647 |
Construction of roads1 |
Plinth level |
-
latitude : 23.66853539,23.66852483
Longitude : 87.39318174,87.39346098
file name : Image_23072024113030837.png
|
2024-07-23 11:30:30.904983 |
239 |
90701862 |
Construction of roads |
113647 |
Construction of roads1 |
Completion of work |
-
latitude : 23.66846198,23.66860091
Longitude : 87.3934876,87.39282733
file name : Image_20072024102657967.png
|
2024-07-20 10:26:58.031064 |
240 |
90704902 |
Construction of roads |
156102 |
Construction of roads1 |
Roof laid |
-
latitude : 23.66522951,23.66527106
Longitude : 87.39301382,87.39304475
file name : Image_29092024085138561.png
|
2024-09-29 08:51:38.615783 |
241 |
90704902 |
Construction of roads |
156102 |
Construction of roads1 |
Plinth level |
-
latitude : 23.66544608,23.66540935
Longitude : 87.39333826,87.39319789
file name : Image_29092024084800084.png
|
2024-09-29 08:48:00.133626 |
242 |
90704902 |
Construction of roads |
156102 |
Construction of roads1 |
Plinth level |
-
latitude : 23.66542733,23.66522937
Longitude : 87.39332856,87.39301853
file name : Image_20072024171219029.png
|
2024-07-20 17:12:19.086494 |
243 |
90704902 |
Construction of roads |
156102 |
Construction of roads1 |
Completion of work |
-
latitude : 23.66516085,23.66541245
Longitude : 87.39313436,87.39333334
file name : Image_18072024182139580.png
|
2024-07-18 18:21:39.647688 |
244 |
90724000 |
Construction of roads |
74228 |
Construction of roads1 |
Roof laid |
-
latitude : 23.66382037,23.66379954
Longitude : 87.39419626,87.39429826
file name : Image_29092024085710148.png
|
2024-09-29 08:57:10.200805 |
245 |
90724000 |
Construction of roads |
74228 |
Construction of roads1 |
Plinth level |
-
latitude : 23.66382521,23.66383757
Longitude : 87.39437116,87.39424312
file name : Image_29092024085353611.png
|
2024-09-29 08:53:53.666325 |
246 |
90724000 |
Construction of roads |
74228 |
Construction of roads1 |
Plinth level |
-
latitude : 23.66377383,23.66377439
Longitude : 87.39444371,87.39399971
file name : Image_21072024121431463.png
|
2024-07-21 12:14:31.530085 |
247 |
90724000 |
Construction of roads |
74228 |
Construction of roads1 |
Completion of work |
-
latitude : 23.66374512,23.66375113
Longitude : 87.39448386,87.39403949
file name : Image_18072024182530969.png
|
2024-07-18 18:25:31.036277 |
248 |
95408183 |
Water Supply to villages |
349925 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.60825066
Longitude : 87.37870383
file name : Image_22072024123948412.png
|
2024-07-22 12:39:48.47964 |
249 |
95405527 |
Water Supply to villages |
349925 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.67546448
Longitude : 87.41217123
file name : Image_23072024110957841.png
|
2024-07-23 11:09:57.902268 |
250 |
90719704 |
Construction of roads |
113647 |
Construction of roads1 |
Roof laid |
-
latitude : 23.62785414,23.62785618
Longitude : 87.42901254,87.42899233
file name : Image_29092024093316956.png
|
2024-09-29 09:33:17.012857 |
251 |
90719704 |
Construction of roads |
113647 |
Construction of roads1 |
Plinth level |
-
latitude : 23.62775682,23.6278188
Longitude : 87.42897644,87.4289853
file name : Image_29092024093022588.png
|
2024-09-29 09:30:22.651373 |
252 |
90719704 |
Construction of roads |
113647 |
Construction of roads1 |
Completion of work |
-
latitude : 23.62777982,23.62813139
Longitude : 87.42904554,87.42911013
file name : Image_23072024151525748.png
|
2024-07-23 15:15:25.805613 |
253 |
90725019 |
Construction of roads |
113647 |
Construction of roads1 |
Roof laid |
-
latitude : 23.63083006,23.63095968
Longitude : 87.40462221,87.40457709
file name : Image_29092024094616393.png
|
2024-09-29 09:46:16.443573 |
254 |
90725019 |
Construction of roads |
113647 |
Construction of roads1 |
Plinth level |
-
latitude : 23.63115545,23.63111054
Longitude : 87.40471615,87.40466642
file name : Image_29092024094403683.png
|
2024-09-29 09:44:03.739842 |
255 |
90725019 |
Construction of roads |
113647 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6311376,23.63087672
Longitude : 87.40463242,87.40470044
file name : Image_23072024123134173.png
|
2024-07-23 12:31:34.26889 |
256 |
96567359 |
Operation & maintenance of community compost/soak pits |
275207 |
Operation & maintenance of community compost/soak pits1 |
Plinth level |
-
latitude : 23.67128028
Longitude : 87.40984311
file name : Image_04082024122951912.png
|
2024-08-04 12:29:51.967387 |
257 |
96567359 |
Operation & maintenance of community compost/soak pits |
275207 |
Operation & maintenance of community compost/soak pits1 |
Completion of work |
-
latitude : 23.67127756
Longitude : 87.40983215
file name : Image_23072024110338892.png
|
2024-07-23 11:03:38.951008 |
258 |
95401768 |
Water Supply to villages |
349582 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.64661225
Longitude : 87.40238835
file name : Image_23072024104745947.png
|
2024-07-23 10:47:45.776718 |
259 |
89217459 |
Maintenance of Street Lights |
194260 |
Maintenance of Street Lights1 |
Roof laid |
-
latitude : 23.65590606
Longitude : 87.40633798
file name : Image_30092024090934503.png
|
2024-09-30 09:09:34.55081 |
260 |
89217459 |
Maintenance of Street Lights |
194260 |
Maintenance of Street Lights1 |
Plinth level |
-
latitude : 23.65581411
Longitude : 87.40648699
file name : Image_30092024085935493.png
|
2024-09-30 08:59:35.551928 |
261 |
89217459 |
Maintenance of Street Lights |
194260 |
Maintenance of Street Lights1 |
Completion of work |
-
latitude : 23.65662551
Longitude : 87.40646419
file name : Image_23072024105453963.png
|
2024-07-23 10:54:53.949491 |
262 |
89217135 |
Installation of Solar lights |
97131 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.63453661
Longitude : 87.38481383
file name : Image_27092024130925310.png
|
2024-09-27 13:09:25.371451 |
263 |
89182965 |
Electric connection |
194260 |
Electric connection1 |
|
-
latitude : 23.64455863
Longitude : 87.41521372
file name : Image_23072024115830527.png
|
2024-07-23 11:58:30.588633 |