1 |
57675501 |
INSTALLATION OF MARK II TUBEWELL AT SUKHDEB BHRAMACHARI ASRAM AT CHAR BIKIHAT SAN X |
99425 |
INSTALLATION OF MARK II TUBEWELL AT SUKHDEB BHRAMACHARI ASRAM AT CHAR BIKIHAT SAN X1 |
Completion of work |
-
latitude : 23.6284085
Longitude : 88.1432344
file name : Image_05062023233418150.png
|
2023-06-05 23:34:18.880248 |
2 |
49133845 |
SPREADING LIME AND BLEACHING AT GP AREA |
750000 |
SPREADING LIME AND BLEACHING AT GP AREA1 |
Completion of work |
-
latitude : 23.6286798
Longitude : 88.1260232
file name : Image_21022022124901250.png
|
2022-02-21 12:49:01.365762 |
3 |
49136295 |
MAINTENANCE OF TUBEWELL |
1200000 |
MAINTENANCE OF TUBEWELL1 |
Roof laid |
-
latitude : 23.6286999
Longitude : 88.1259855
file name : Image_17032022124213373.png
|
2022-03-17 12:42:13.488916 |
4 |
49134363 |
DATA BASE MAINTENANCE |
50000 |
DATA BASE MAINTENANCE1 |
Roof laid |
-
latitude : 23.6287161
Longitude : 88.1259303
file name : Image_17032022125523758.png
|
2022-03-17 12:55:23.879906 |
5 |
49134363 |
DATA BASE MAINTENANCE |
50000 |
DATA BASE MAINTENANCE1 |
Roof laid |
-
latitude : 23.6286959
Longitude : 88.1259819
file name : Image_17032022124837590.png
|
2022-03-17 12:48:37.701371 |
6 |
49134363 |
DATA BASE MAINTENANCE |
50000 |
DATA BASE MAINTENANCE1 |
Roof laid |
-
latitude : 23.6286855
Longitude : 88.1259605
file name : Image_17032022124253459.png
|
2022-03-17 12:42:54.173781 |
7 |
49134363 |
DATA BASE MAINTENANCE |
50000 |
DATA BASE MAINTENANCE1 |
Completion of work |
-
latitude : 23.6287011
Longitude : 88.1259671
file name : Image_15032022141809748.png
|
2022-03-15 14:18:09.852119 |
8 |
49085045 |
PCC ROAD WITH PROTECTION WALL SUBHASH DEBNATH TO MANGAL DAS AT PANUHAT BARUJIBI COLONY SAN VI |
52728 |
PCC ROAD WITH PROTECTION WALL SUBHASH DEBNATH TO MANGAL DAS AT PANUHAT BARUJIBI COLONY SAN VI1 |
Completion of work |
-
latitude : 23.632713295519352,23.632713295519352
Longitude : 88.144058464095,88.144058464095
file name : Image_12032022095638309.png
|
2022-03-12 09:56:38.426285 |
9 |
49088682 |
REAPIRING PCC ROAD (INCLUDING DRAIN) RATNA CHAKRABORTY TO KALICHARAN DAS AT KHAJURDIHI RAKSHYA KALI |
132101 |
REAPIRING PCC ROAD (INCLUDING DRAIN) RATNA CHAKRABORTY TO KALICHARAN DAS AT KHAJURDIHI RAKSHYA KALI 1 |
Roof laid |
-
latitude : 23.6284051,23.6284051
Longitude : 88.1432227,88.1432227
file name : Image_24022023110815896.png
|
2023-02-24 11:08:16.692346 |
10 |
49088682 |
REAPIRING PCC ROAD (INCLUDING DRAIN) RATNA CHAKRABORTY TO KALICHARAN DAS AT KHAJURDIHI RAKSHYA KALI |
132101 |
REAPIRING PCC ROAD (INCLUDING DRAIN) RATNA CHAKRABORTY TO KALICHARAN DAS AT KHAJURDIHI RAKSHYA KALI 1 |
Roof laid |
-
latitude : 23.6284297,23.6284297
Longitude : 88.1431954,88.1431954
file name : Image_24022023104324228.png
|
2023-02-24 10:43:24.452674 |
11 |
49088682 |
REAPIRING PCC ROAD (INCLUDING DRAIN) RATNA CHAKRABORTY TO KALICHARAN DAS AT KHAJURDIHI RAKSHYA KALI |
132101 |
REAPIRING PCC ROAD (INCLUDING DRAIN) RATNA CHAKRABORTY TO KALICHARAN DAS AT KHAJURDIHI RAKSHYA KALI 1 |
Completion of work |
-
latitude : 23.6190333,23.6190333
Longitude : 88.1219016,88.1219016
file name : Image_11032022121609816.png
|
2022-03-11 12:16:09.925657 |
12 |
49088506 |
CONSTRUCTION OF PCC ROAD FROM ALAUDDIN MONDAL HOUSE TO KEDAR MONDAL HOUSE AT KHAJURIDHI MADHYA MUSLI |
59782 |
CONSTRUCTION OF PCC ROAD FROM ALAUDDIN MONDAL HOUSE TO KEDAR MONDAL HOUSE AT KHAJURIDHI MADHYA MUSLI1 |
Roof laid |
-
latitude : 23.6284318,23.6284318
Longitude : 88.1431934,88.1431934
file name : Image_24022023110518427.png
|
2023-02-24 11:05:19.226663 |
13 |
49088506 |
CONSTRUCTION OF PCC ROAD FROM ALAUDDIN MONDAL HOUSE TO KEDAR MONDAL HOUSE AT KHAJURIDHI MADHYA MUSLI |
59782 |
CONSTRUCTION OF PCC ROAD FROM ALAUDDIN MONDAL HOUSE TO KEDAR MONDAL HOUSE AT KHAJURIDHI MADHYA MUSLI1 |
Completion of work |
-
latitude : 23.617408694699407,23.617408694699407
Longitude : 88.12283087521791,88.12283087521791
file name : Image_11032022122719511.png
|
2022-03-11 12:27:19.630426 |
14 |
49133501 |
bio drvercity mondalhat bagan san viii |
100000 |
bio drvercity mondalhat bagan san viii1 |
Roof laid |
-
latitude : 23.6292991
Longitude : 88.1433031
file name : Image_07072022174947722.png
|
2022-07-07 17:49:48.357627 |
15 |
49133501 |
bio drvercity mondalhat bagan san viii |
100000 |
bio drvercity mondalhat bagan san viii1 |
Plinth level |
-
latitude : 23.6292999
Longitude : 88.143304
file name : Image_07072022174807694.png
|
2022-07-07 17:48:08.374132 |
16 |
49133501 |
bio drvercity mondalhat bagan san viii |
100000 |
bio drvercity mondalhat bagan san viii1 |
Completion of work |
-
latitude : 23.6292998
Longitude : 88.143304
file name : Image_07072022174704184.png
|
2022-07-07 17:47:04.770745 |
17 |
49083625 |
PCC ROAD PRABHASH ROY TO CHANDU MAJHI AT EKAIHAT SAN XI |
159689 |
PCC ROAD PRABHASH ROY TO CHANDU MAJHI AT EKAIHAT SAN XI1 |
Roof laid |
-
latitude : 23.6221959348768,23.6221959348768
Longitude : 88.14539755694568,88.14539755694568
file name : Image_05082022103628050.png
|
2022-08-05 10:36:28.143685 |
18 |
49083625 |
PCC ROAD PRABHASH ROY TO CHANDU MAJHI AT EKAIHAT SAN XI |
159689 |
PCC ROAD PRABHASH ROY TO CHANDU MAJHI AT EKAIHAT SAN XI1 |
Plinth level |
-
latitude : 23.622209974564612,23.622209974564612
Longitude : 88.14542555250227,88.14542555250227
file name : Image_05082022103301796.png
|
2022-08-05 10:33:01.904564 |
19 |
49083625 |
PCC ROAD PRABHASH ROY TO CHANDU MAJHI AT EKAIHAT SAN XI |
159689 |
PCC ROAD PRABHASH ROY TO CHANDU MAJHI AT EKAIHAT SAN XI1 |
Completion of work |
-
latitude : 23.62221475224942,23.62221475224942
Longitude : 88.14555672928691,88.14555672928691
file name : Image_19072022110524124.png
|
2022-07-19 11:05:24.206227 |
20 |
57675811 |
INSTALLATION OF MARK II TUBEWELL AT DEBASIS DAS HOUSE AT MONDALHAT NANDI PARA SAN VII |
99425 |
INSTALLATION OF MARK II TUBEWELL AT DEBASIS DAS HOUSE AT MONDALHAT NANDI PARA SAN VII1 |
Completion of work |
-
latitude : 23.628409
Longitude : 88.1432355
file name : Image_09062023233333458.png
|
2023-06-09 23:33:34.162217 |
21 |
57676679 |
INSTALLATION OF MARK II TUBEWELL AT IDGARH AT NATUNGRAM SAN XIX |
99425 |
INSTALLATION OF MARK II TUBEWELL AT IDGARH AT NATUNGRAM SAN XIX1 |
Completion of work |
-
latitude : 23.6284081
Longitude : 88.1432378
file name : Image_10062023002836874.png
|
2023-06-10 00:28:37.432627 |
22 |
58926421 |
CONST OF PCC ROAD FROM BISWANATH MAJUMDER TO GOUTAM SHING EKAIHAT SAN XI |
166345 |
CONST OF PCC ROAD FROM BISWANATH MAJUMDER TO GOUTAM SHING EKAIHAT SAN XI1 |
Roof laid |
-
latitude : 23.622413906268775,23.622413906268775
Longitude : 88.14629794098437,88.14629794098437
file name : Image_12032023094501113.png
|
2023-03-12 09:45:01.217885 |
23 |
58926421 |
CONST OF PCC ROAD FROM BISWANATH MAJUMDER TO GOUTAM SHING EKAIHAT SAN XI |
166345 |
CONST OF PCC ROAD FROM BISWANATH MAJUMDER TO GOUTAM SHING EKAIHAT SAN XI1 |
Plinth level |
-
latitude : 23.622352802194655,23.622352802194655
Longitude : 88.14634739421308,88.14634739421308
file name : Image_12032023094307325.png
|
2023-03-12 09:43:07.417621 |
24 |
58926421 |
CONST OF PCC ROAD FROM BISWANATH MAJUMDER TO GOUTAM SHING EKAIHAT SAN XI |
166345 |
CONST OF PCC ROAD FROM BISWANATH MAJUMDER TO GOUTAM SHING EKAIHAT SAN XI1 |
Completion of work |
-
latitude : 23.62239655572921,23.622323591262102
Longitude : 88.14634194597602,88.14640112221241
file name : Image_12032023093947848.png
|
2023-03-12 09:39:47.963343 |
25 |
49088753 |
CONSTRUCTION OF PCC ROAD FROM KEBOL GHOSH TO KANGAL GHOSH AT KHAJURDIHI GHOSH PARA |
127834 |
CONSTRUCTION OF PCC ROAD FROM KEBOL GHOSH TO KANGAL GHOSH AT KHAJURDIHI GHOSH PARA1 |
Completion of work |
-
latitude : 23.6191865,23.6191865
Longitude : 88.1201271,88.1201271
file name : Image_19072022133609706.png
|
2022-07-19 13:36:09.813576 |
26 |
49129459 |
CONSTRUCTION OF RCC DRAIN FROM K K ROAD TO SCHOOL QUARTER AT KHAJURIDHI GHOSH [ARA SAN XIII |
124252 |
CONSTRUCTION OF RCC DRAIN FROM K K ROAD TO SCHOOL QUARTER AT KHAJURIDHI GHOSH [ARA SAN XIII1 |
Roof laid |
-
latitude : 23.6286433,23.6286433
Longitude : 88.1259642,88.1259642
file name : Image_23082022144544251.png
|
2022-08-23 14:45:44.367458 |
27 |
49129459 |
CONSTRUCTION OF RCC DRAIN FROM K K ROAD TO SCHOOL QUARTER AT KHAJURIDHI GHOSH [ARA SAN XIII |
124252 |
CONSTRUCTION OF RCC DRAIN FROM K K ROAD TO SCHOOL QUARTER AT KHAJURIDHI GHOSH [ARA SAN XIII1 |
Completion of work |
-
latitude : 23.619907633401453,23.619907633401453
Longitude : 88.11914996244013,88.11914996244013
file name : Image_19072022133936181.png
|
2022-07-19 13:39:36.286517 |
28 |
49088209 |
REAPIRING OF PCC ROAD FROM ALOK NATH ROY TO JARULI PUKUR PAR AT KHAJURDIHI MAJHER PARA SAN XIV |
99139 |
REAPIRING OF PCC ROAD FROM ALOK NATH ROY TO JARULI PUKUR PAR AT KHAJURDIHI MAJHER PARA SAN XIV1 |
Roof laid |
-
latitude : 23.617841955274343,23.617841955274343
Longitude : 88.12028344720602,88.12028344720602
file name : Image_05082022122313135.png
|
2022-08-05 12:23:13.227489 |
29 |
49088209 |
REAPIRING OF PCC ROAD FROM ALOK NATH ROY TO JARULI PUKUR PAR AT KHAJURDIHI MAJHER PARA SAN XIV |
99139 |
REAPIRING OF PCC ROAD FROM ALOK NATH ROY TO JARULI PUKUR PAR AT KHAJURDIHI MAJHER PARA SAN XIV1 |
Plinth level |
-
latitude : 23.617868442088366,23.617868442088366
Longitude : 88.12031001783907,88.12031001783907
file name : Image_05082022122134576.png
|
2022-08-05 12:21:34.666477 |
30 |
49088209 |
REAPIRING OF PCC ROAD FROM ALOK NATH ROY TO JARULI PUKUR PAR AT KHAJURDIHI MAJHER PARA SAN XIV |
99139 |
REAPIRING OF PCC ROAD FROM ALOK NATH ROY TO JARULI PUKUR PAR AT KHAJURDIHI MAJHER PARA SAN XIV1 |
Completion of work |
-
latitude : 23.617883655242622,23.617883655242622
Longitude : 88.12025645747781,88.12025645747781
file name : Image_18072022123827949.png
|
2022-07-18 12:38:28.058021 |
31 |
49085332 |
REAPIRING OF PCC ROAD KANAI DEBNATH TO HARIDAS DEBNATH AT MONDALHAT SAN VIII |
198218 |
REAPIRING OF PCC ROAD KANAI DEBNATH TO HARIDAS DEBNATH AT MONDALHAT SAN VIII1 |
Completion of work |
-
latitude : 23.627488897182047,23.627488897182047
Longitude : 88.14106377772987,88.14106377772987
file name : Image_09032022094829988.png
|
2022-03-09 09:48:30.095798 |
32 |
49135666 |
INSTALLATION MARK II TUBE WELL SETS AT BIKIHAT NEAR THE HOUSE OF DHIREN MAJHI SAN XII |
99843 |
INSTALLATION MARK II TUBE WELL SETS AT BIKIHAT NEAR THE HOUSE OF DHIREN MAJHI SAN XII1 |
Roof laid |
-
latitude : 23.619628264568746
Longitude : 88.15097194164991
file name : Image_09032022102337702.png
|
2022-03-09 10:23:37.801724 |
33 |
49135666 |
INSTALLATION MARK II TUBE WELL SETS AT BIKIHAT NEAR THE HOUSE OF DHIREN MAJHI SAN XII |
99843 |
INSTALLATION MARK II TUBE WELL SETS AT BIKIHAT NEAR THE HOUSE OF DHIREN MAJHI SAN XII1 |
Plinth level |
-
latitude : 23.61963115632534
Longitude : 88.15099800936878
file name : Image_09032022102128885.png
|
2022-03-09 10:21:28.986566 |
34 |
49135666 |
INSTALLATION MARK II TUBE WELL SETS AT BIKIHAT NEAR THE HOUSE OF DHIREN MAJHI SAN XII |
99843 |
INSTALLATION MARK II TUBE WELL SETS AT BIKIHAT NEAR THE HOUSE OF DHIREN MAJHI SAN XII1 |
Completion of work |
-
latitude : 23.619589456357062
Longitude : 88.15093799494207
file name : Image_09032022101902293.png
|
2022-03-09 10:19:02.387261 |
35 |
49089980 |
CONSTRUCTION OF PCC ROAD DULAL BISWAS TO RASMOHAN CHAKRABORTY AT CHAR EKAIHAT SAN X |
82083 |
CONSTRUCTION OF PCC ROAD DULAL BISWAS TO RASMOHAN CHAKRABORTY AT CHAR EKAIHAT SAN X1 |
Completion of work |
-
latitude : 23.625037483870983,23.625037483870983
Longitude : 88.15172312781215,88.15172312781215
file name : Image_12032022093056795.png
|
2022-03-12 09:30:56.933551 |
36 |
49085599 |
REAPIRING OF PCC ROAD WITH DRAIN SILA PUKUR PAR TO DHIREN DEBNATH A MONDALHAT SAN VIII |
98078 |
REAPIRING OF PCC ROAD WITH DRAIN SILA PUKUR PAR TO DHIREN DEBNATH A MONDALHAT SAN VIII1 |
Roof laid |
-
latitude : 23.628341,23.628341
Longitude : 88.1412347,88.1412347
file name : Image_09032022094332876.png
|
2022-03-09 09:43:32.991106 |
37 |
49085599 |
REAPIRING OF PCC ROAD WITH DRAIN SILA PUKUR PAR TO DHIREN DEBNATH A MONDALHAT SAN VIII |
98078 |
REAPIRING OF PCC ROAD WITH DRAIN SILA PUKUR PAR TO DHIREN DEBNATH A MONDALHAT SAN VIII1 |
Plinth level |
-
latitude : 23.628369960933924,23.628369960933924
Longitude : 88.14219064079225,88.14219064079225
file name : Image_09032022094106533.png
|
2022-03-09 09:41:06.643201 |
38 |
49085599 |
REAPIRING OF PCC ROAD WITH DRAIN SILA PUKUR PAR TO DHIREN DEBNATH A MONDALHAT SAN VIII |
98078 |
REAPIRING OF PCC ROAD WITH DRAIN SILA PUKUR PAR TO DHIREN DEBNATH A MONDALHAT SAN VIII1 |
Completion of work |
-
latitude : 23.628375702537596,23.628383832983673
Longitude : 88.141904566437,88.14206172712147
file name : Image_09032022093652604.png
|
2022-03-09 09:36:52.757394 |
39 |
49085427 |
REAPIRING OF PCC ROAD GOURANGA DEBNATH TO MALAY DEBNATH AT MONDALHA SAN VII |
211354 |
REAPIRING OF PCC ROAD GOURANGA DEBNATH TO MALAY DEBNATH AT MONDALHA SAN VII1 |
Completion of work |
-
latitude : 23.62880778964609,23.62880778964609
Longitude : 88.14603223465383,88.14603223465383
file name : Image_09032022100021646.png
|
2022-03-09 10:00:21.760782 |
40 |
49133334 |
construction of pucca drain from madhab hazra to sheoro pukur par at mondalhat san viii |
205422 |
construction of pucca drain from madhab hazra to sheoro pukur par at mondalhat san viii1 |
Plinth level |
-
latitude : 23.62623722758144,23.62623722758144
Longitude : 88.14176877960563,88.14176877960563
file name : Image_09032022095415562.png
|
2022-03-09 09:54:15.682306 |
41 |
49133334 |
construction of pucca drain from madhab hazra to sheoro pukur par at mondalhat san viii |
205422 |
construction of pucca drain from madhab hazra to sheoro pukur par at mondalhat san viii1 |
Completion of work |
-
latitude : 23.626133291982114,23.626133291982114
Longitude : 88.14176676794887,88.14176676794887
file name : Image_09032022095236595.png
|
2022-03-09 09:52:36.713353 |
42 |
49118151 |
PUCCA DRAIN SUKDEB BRAMACHARYA TO SANITALA CULVERT AT MONDALHAT SAN VII |
349093 |
PUCCA DRAIN SUKDEB BRAMACHARYA TO SANITALA CULVERT AT MONDALHAT SAN VII1 |
Roof laid |
-
latitude : 23.6258396,23.6258389
Longitude : 88.1480301,88.1480252
file name : Image_06072022101026122.png
|
2022-07-06 10:10:26.215058 |
43 |
49118151 |
PUCCA DRAIN SUKDEB BRAMACHARYA TO SANITALA CULVERT AT MONDALHAT SAN VII |
349093 |
PUCCA DRAIN SUKDEB BRAMACHARYA TO SANITALA CULVERT AT MONDALHAT SAN VII1 |
Roof laid |
-
latitude : 23.6258396,23.6258389
Longitude : 88.1480301,88.1480252
file name : Image_06072022101020257.png
|
2022-07-06 10:10:20.345725 |
44 |
49118151 |
PUCCA DRAIN SUKDEB BRAMACHARYA TO SANITALA CULVERT AT MONDALHAT SAN VII |
349093 |
PUCCA DRAIN SUKDEB BRAMACHARYA TO SANITALA CULVERT AT MONDALHAT SAN VII1 |
Completion of work |
-
latitude : 23.626071601174772,23.626071601174772
Longitude : 88.14844697713852,88.14844697713852
file name : Image_09032022100824584.png
|
2022-03-09 10:08:24.679129 |
45 |
49086571 |
CONSTRUCTION OF PCC ROAD FROM PIRU GHOSH HOUSE TO DASU GHOSH AT KHAJURDIHI HAT PUKUR PAR SAN XIII |
94530 |
CONSTRUCTION OF PCC ROAD FROM PIRU GHOSH HOUSE TO DASU GHOSH AT KHAJURDIHI HAT PUKUR PAR SAN XIII1 |
Completion of work |
-
latitude : 23.62217296846211,23.62217296846211
Longitude : 88.11834127642214,88.11834127642214
file name : Image_11032022143822480.png
|
2022-03-11 14:38:22.613167 |
46 |
49088907 |
REAPIRING OF ROAD SANJAY GHOSH TO SUKUMAR PAL HOUSE AT KHAJURDIHI UTTRA PAL PARA SAN XV |
114539 |
REAPIRING OF ROAD SANJAY GHOSH TO SUKUMAR PAL HOUSE AT KHAJURDIHI UTTRA PAL PARA SAN XV1 |
Completion of work |
-
latitude : 23.619932527653873,23.619932527653873
Longitude : 88.12056843191385,88.12056843191385
file name : Image_11032022121954449.png
|
2022-03-11 12:19:54.546986 |
47 |
49084474 |
REAPIRING OF PCC ROAD PRASANTA SARKAR TO SUNIL BISWAS AT CHAR PANUHAT SAN IX |
198218 |
REAPIRING OF PCC ROAD PRASANTA SARKAR TO SUNIL BISWAS AT CHAR PANUHAT SAN IX1 |
Plinth level |
-
latitude : 23.6328015,23.6328015
Longitude : 88.147564,88.147564
file name : Image_12032022094347432.png
|
2022-03-12 09:43:47.539933 |
48 |
49084474 |
REAPIRING OF PCC ROAD PRASANTA SARKAR TO SUNIL BISWAS AT CHAR PANUHAT SAN IX |
198218 |
REAPIRING OF PCC ROAD PRASANTA SARKAR TO SUNIL BISWAS AT CHAR PANUHAT SAN IX1 |
Completion of work |
-
latitude : 23.6329645,23.6329645
Longitude : 88.1487726,88.1487726
file name : Image_12032022094049250.png
|
2022-03-12 09:40:49.366129 |
49 |
49128402 |
CONSTRUCTION OF RCC DRAIN FROM CHANDI CHARAN NORTH EAST CORNER TO CULVERT AT KHAJURDIHI HARI SAGAR |
209812 |
CONSTRUCTION OF RCC DRAIN FROM CHANDI CHARAN NORTH EAST CORNER TO CULVERT AT KHAJURDIHI HARI SAGAR 1 |
Completion of work |
-
latitude : 23.620254769921303,23.620226942002773
Longitude : 88.11702414415777,88.11705633066595
file name : Image_11032022123400650.png
|
2022-03-11 12:34:00.767558 |
50 |
49089306 |
REAPIRING PCC ROAD SAMAD SK TO KUTUBUDDIN SK AT KHAJURDIHI MADHYA MUSLIM PARA SAN XIV |
100390 |
REAPIRING PCC ROAD SAMAD SK TO KUTUBUDDIN SK AT KHAJURDIHI MADHYA MUSLIM PARA SAN XIV1 |
Completion of work |
-
latitude : 23.61767251510173,23.61767251510173
Longitude : 88.12151198275387,88.12151198275387
file name : Image_11032022122403385.png
|
2022-03-11 12:24:03.498022 |
51 |
49117473 |
PUCCA DRAIN JATIN MONDAL TO MANAB BISWAS AT EKAIHAT SAN XI |
111912 |
PUCCA DRAIN JATIN MONDAL TO MANAB BISWAS AT EKAIHAT SAN XI1 |
Completion of work |
-
latitude : 23.6239775,23.6239923
Longitude : 88.1490288,88.149049
file name : Image_09032022103803084.png
|
2022-03-09 10:38:03.188601 |
52 |
34534133 |
Installatin of Solar light from the Club Yuba Sangha |
399942 |
Installatin of Solar light from the Club Yuba Sangha1 |
Roof laid |
-
latitude : 23.628948898985982
Longitude : 88.1227777339518
file name : Image_11022022122113324.png
|
2022-02-11 12:21:13.433597 |
53 |
34534133 |
Installatin of Solar light from the Club Yuba Sangha |
399942 |
Installatin of Solar light from the Club Yuba Sangha1 |
Completion of work |
-
latitude : 23.628977397456765
Longitude : 88.12276650220156
file name : Image_25082021124028054.png
|
2021-08-25 12:40:28.183777 |
54 |
49084188 |
PCC ROAD KHOKAN PAL TO MAMOTA BHOUMICK AT PANUHAT SAN III |
237520 |
PCC ROAD KHOKAN PAL TO MAMOTA BHOUMICK AT PANUHAT SAN III1 |
Completion of work |
-
latitude : 23.631690577603877,23.631690577603877
Longitude : 88.13923057168722,88.13923057168722
file name : Image_12032022100712712.png
|
2022-03-12 10:07:12.802775 |
55 |
49129854 |
CONSTRUCTION RCC COVER DRAIN (MINI CULVERT)OVER IRRIGATION CANEL OVER THE HOME OF ALAM MALLICK KHAJU |
248651 |
CONSTRUCTION RCC COVER DRAIN (MINI CULVERT)OVER IRRIGATION CANEL OVER THE HOME OF ALAM MALLICK KHAJU1 |
Roof laid |
-
latitude : 23.6284366,23.6284366
Longitude : 88.1431877,88.1431877
file name : Image_24022023110629566.png
|
2023-02-24 11:06:30.283991 |
56 |
49129854 |
CONSTRUCTION RCC COVER DRAIN (MINI CULVERT)OVER IRRIGATION CANEL OVER THE HOME OF ALAM MALLICK KHAJU |
248651 |
CONSTRUCTION RCC COVER DRAIN (MINI CULVERT)OVER IRRIGATION CANEL OVER THE HOME OF ALAM MALLICK KHAJU1 |
Completion of work |
-
latitude : 23.6284168,23.6284168
Longitude : 88.1431771,88.1431771
file name : Image_24022023104838638.png
|
2023-02-24 10:48:38.850148 |
57 |
49129854 |
CONSTRUCTION RCC COVER DRAIN (MINI CULVERT)OVER IRRIGATION CANEL OVER THE HOME OF ALAM MALLICK KHAJU |
248651 |
CONSTRUCTION RCC COVER DRAIN (MINI CULVERT)OVER IRRIGATION CANEL OVER THE HOME OF ALAM MALLICK KHAJU1 |
Completion of work |
-
latitude : 23.617586265318096,23.61758408602327
Longitude : 88.12982155010104,88.1298290938139
file name : Image_11032022120948321.png
|
2022-03-11 12:09:48.418715 |
58 |
48671074 |
PCC ROAD (INCLUDING DRAIN) GOPAL MONDAL TO BALARAM AT BIKIHAT SANXII |
189845 |
PCC ROAD (INCLUDING DRAIN) GOPAL MONDAL TO BALARAM AT BIKIHAT SANXII1 |
Plinth level |
-
latitude : 23.622582256793976,23.622582256793976
Longitude : 88.1476487684995,88.1476487684995
file name : Image_17032022103027343.png
|
2022-03-17 10:30:27.44078 |
59 |
48671074 |
PCC ROAD (INCLUDING DRAIN) GOPAL MONDAL TO BALARAM AT BIKIHAT SANXII |
189845 |
PCC ROAD (INCLUDING DRAIN) GOPAL MONDAL TO BALARAM AT BIKIHAT SANXII1 |
Completion of work |
-
latitude : 23.6225128127262,23.6225128127262
Longitude : 88.14789754338562,88.14789754338562
file name : Image_10032022091640805.png
|
2022-03-10 09:16:40.889155 |
60 |
49085251 |
PCC ROAD LAXMAN SARKAR TO DINABANDHU DAS AT CHAR PANUHAT SAN IX |
310986 |
PCC ROAD LAXMAN SARKAR TO DINABANDHU DAS AT CHAR PANUHAT SAN IX1 |
Roof laid |
-
latitude : 23.63269854336977,23.63269854336977
Longitude : 88.14654394984245,88.14654394984245
file name : Image_29072022104140496.png
|
2022-07-29 10:41:40.607667 |
61 |
49085251 |
PCC ROAD LAXMAN SARKAR TO DINABANDHU DAS AT CHAR PANUHAT SAN IX |
310986 |
PCC ROAD LAXMAN SARKAR TO DINABANDHU DAS AT CHAR PANUHAT SAN IX1 |
Plinth level |
-
latitude : 23.63276723306626,23.63276723306626
Longitude : 88.1464243400842,88.1464243400842
file name : Image_29072022103737004.png
|
2022-07-29 10:37:37.103382 |
62 |
49085251 |
PCC ROAD LAXMAN SARKAR TO DINABANDHU DAS AT CHAR PANUHAT SAN IX |
310986 |
PCC ROAD LAXMAN SARKAR TO DINABANDHU DAS AT CHAR PANUHAT SAN IX1 |
Completion of work |
-
latitude : 23.63277381286025,23.63277381286025
Longitude : 88.14647320657969,88.14647320657969
file name : Image_19072022104802827.png
|
2022-07-19 10:48:02.937765 |
63 |
49083741 |
PCC RAOD EKATA SANGHA TO SURAJIT SAHA AT PAUHAT SAN IV |
68428 |
PCC RAOD EKATA SANGHA TO SURAJIT SAHA AT PAUHAT SAN IV1 |
Roof laid |
-
latitude : 23.6318371,23.6318371
Longitude : 88.1400889,88.1400889
file name : Image_24072022114009358.png
|
2022-07-24 11:40:09.455618 |
64 |
49083741 |
PCC RAOD EKATA SANGHA TO SURAJIT SAHA AT PAUHAT SAN IV |
68428 |
PCC RAOD EKATA SANGHA TO SURAJIT SAHA AT PAUHAT SAN IV1 |
Plinth level |
-
latitude : 23.631637142971158,23.631637142971158
Longitude : 88.14042499288917,88.14042499288917
file name : Image_24072022113901745.png
|
2022-07-24 11:39:01.83718 |
65 |
49083741 |
PCC RAOD EKATA SANGHA TO SURAJIT SAHA AT PAUHAT SAN IV |
68428 |
PCC RAOD EKATA SANGHA TO SURAJIT SAHA AT PAUHAT SAN IV1 |
Completion of work |
-
latitude : 23.6317794,23.6317794
Longitude : 88.1400659,88.1400659
file name : Image_14072022092721112.png
|
2022-07-14 09:27:21.21824 |
66 |
49088266 |
REAPIRING OF PCC ROAD FROM K K ROAD TO SAMAD SK HOUSE AT KHAJURDIHI DAKSHIN PAL PARA SAN XIV |
150277 |
REAPIRING OF PCC ROAD FROM K K ROAD TO SAMAD SK HOUSE AT KHAJURDIHI DAKSHIN PAL PARA SAN XIV1 |
Roof laid |
-
latitude : 23.617443395778537,23.617443395778537
Longitude : 88.12050950713456,88.12050950713456
file name : Image_05082022121659591.png
|
2022-08-05 12:16:59.683657 |
67 |
49088266 |
REAPIRING OF PCC ROAD FROM K K ROAD TO SAMAD SK HOUSE AT KHAJURDIHI DAKSHIN PAL PARA SAN XIV |
150277 |
REAPIRING OF PCC ROAD FROM K K ROAD TO SAMAD SK HOUSE AT KHAJURDIHI DAKSHIN PAL PARA SAN XIV1 |
Plinth level |
-
latitude : 23.617425793781877,23.617425793781877
Longitude : 88.12051235698164,88.12051235698164
file name : Image_05082022121405646.png
|
2022-08-05 12:14:05.746511 |
68 |
49088266 |
REAPIRING OF PCC ROAD FROM K K ROAD TO SAMAD SK HOUSE AT KHAJURDIHI DAKSHIN PAL PARA SAN XIV |
150277 |
REAPIRING OF PCC ROAD FROM K K ROAD TO SAMAD SK HOUSE AT KHAJURDIHI DAKSHIN PAL PARA SAN XIV1 |
Completion of work |
-
latitude : 23.617631779052317,23.617631779052317
Longitude : 88.11924249865115,88.11924249865115
file name : Image_19072022135314679.png
|
2022-07-19 13:53:14.780908 |
69 |
49088338 |
REPAIRING OF PCC ROAD HEKMAT MONDAL TO SALIM MALLICK HOUSE AT KHAJURDIHI MADHYA MUSLIM PARA SAN XIV |
37948 |
REPAIRING OF PCC ROAD HEKMAT MONDAL TO SALIM MALLICK HOUSE AT KHAJURDIHI MADHYA MUSLIM PARA SAN XIV1 |
Completion of work |
-
latitude : 23.61721419263631,23.61721419263631
Longitude : 88.12272509559989,88.12272509559989
file name : Image_11032022122820065.png
|
2022-03-11 12:28:20.17301 |
70 |
49089223 |
REAPIRING OF ROAD MONGIRA BIBI TO REHENA MALLICK AT KHAJURDIHI MATH PARA SAN XVII |
171613 |
REAPIRING OF ROAD MONGIRA BIBI TO REHENA MALLICK AT KHAJURDIHI MATH PARA SAN XVII1 |
Roof laid |
-
latitude : 23.61704391427338,23.61704391427338
Longitude : 88.12461219727993,88.12461219727993
file name : Image_26072022125851680.png
|
2022-07-26 12:58:51.789495 |
71 |
49089223 |
REAPIRING OF ROAD MONGIRA BIBI TO REHENA MALLICK AT KHAJURDIHI MATH PARA SAN XVII |
171613 |
REAPIRING OF ROAD MONGIRA BIBI TO REHENA MALLICK AT KHAJURDIHI MATH PARA SAN XVII1 |
Plinth level |
-
latitude : 23.617783491499722,23.617783491499722
Longitude : 88.1245708744973,88.1245708744973
file name : Image_26072022125424875.png
|
2022-07-26 12:54:24.978187 |
72 |
49089223 |
REAPIRING OF ROAD MONGIRA BIBI TO REHENA MALLICK AT KHAJURDIHI MATH PARA SAN XVII |
171613 |
REAPIRING OF ROAD MONGIRA BIBI TO REHENA MALLICK AT KHAJURDIHI MATH PARA SAN XVII1 |
Completion of work |
-
latitude : 23.61806365661323,23.61806365661323
Longitude : 88.124726023525,88.124726023525
file name : Image_19072022134733082.png
|
2022-07-19 13:47:33.181663 |
73 |
49084081 |
REAPIRING OF PCC ROAD (INCLUDING DRAIN) TAPAN DEBNATH TO DULAL PAL AT PANUHAT SAN III |
217359 |
REAPIRING OF PCC ROAD (INCLUDING DRAIN) TAPAN DEBNATH TO DULAL PAL AT PANUHAT SAN III1 |
Roof laid |
-
latitude : 23.6286819,23.6286771
Longitude : 88.1259422,88.125941
file name : Image_24022023151620514.png
|
2023-02-24 15:16:21.362887 |
74 |
49084081 |
REAPIRING OF PCC ROAD (INCLUDING DRAIN) TAPAN DEBNATH TO DULAL PAL AT PANUHAT SAN III |
217359 |
REAPIRING OF PCC ROAD (INCLUDING DRAIN) TAPAN DEBNATH TO DULAL PAL AT PANUHAT SAN III1 |
Plinth level |
-
latitude : 23.6286957,23.6286957
Longitude : 88.1259414,88.1259414
file name : Image_24022023151501953.png
|
2023-02-24 15:15:02.897249 |
75 |
49084081 |
REAPIRING OF PCC ROAD (INCLUDING DRAIN) TAPAN DEBNATH TO DULAL PAL AT PANUHAT SAN III |
217359 |
REAPIRING OF PCC ROAD (INCLUDING DRAIN) TAPAN DEBNATH TO DULAL PAL AT PANUHAT SAN III1 |
Completion of work |
-
latitude : 23.6327862,23.6327862
Longitude : 88.1396496,88.1396496
file name : Image_19072022105733075.png
|
2022-07-19 10:57:33.188005 |
76 |
57675215 |
INSTALLATION OF MARK II TUBE WELL AT PANUHAT DANGA PARA ANSORA BIBI |
99425 |
INSTALLATION OF MARK II TUBE WELL AT PANUHAT DANGA PARA ANSORA BIBI 1 |
Completion of work |
-
latitude : 23.6284111
Longitude : 88.1432335
file name : Image_09062023233256129.png
|
2023-06-09 23:32:56.728217 |
77 |
57676110 |
INSTALLATION OF MARK II TUBEWELL AT ANANTA GOSWAMI ASRAM AT MONDALHAT SAN VIII |
99425 |
INSTALLATION OF MARK II TUBEWELL AT ANANTA GOSWAMI ASRAM AT MONDALHAT SAN VIII1 |
Completion of work |
-
latitude : 23.6284085
Longitude : 88.1432382
file name : Image_10062023002904289.png
|
2023-06-10 00:29:04.949727 |
78 |
49089397 |
PCC ROAD WITH DRAIN (COVER SLAB) SAFICUL SK TO ANEHARA BIBI AT NATUNGRAM SAN XIX |
252034 |
PCC ROAD WITH DRAIN (COVER SLAB) SAFICUL SK TO ANEHARA BIBI AT NATUNGRAM SAN XIX1 |
Roof laid |
-
latitude : 23.628638,23.628638
Longitude : 88.1259707,88.1259707
file name : Image_10082022153435455.png
|
2022-08-10 15:34:35.552728 |
79 |
49089397 |
PCC ROAD WITH DRAIN (COVER SLAB) SAFICUL SK TO ANEHARA BIBI AT NATUNGRAM SAN XIX |
252034 |
PCC ROAD WITH DRAIN (COVER SLAB) SAFICUL SK TO ANEHARA BIBI AT NATUNGRAM SAN XIX1 |
Plinth level |
-
latitude : 23.6286309,23.628635
Longitude : 88.1259687,88.1259678
file name : Image_10082022153127607.png
|
2022-08-10 15:31:28.471683 |
80 |
49089397 |
PCC ROAD WITH DRAIN (COVER SLAB) SAFICUL SK TO ANEHARA BIBI AT NATUNGRAM SAN XIX |
252034 |
PCC ROAD WITH DRAIN (COVER SLAB) SAFICUL SK TO ANEHARA BIBI AT NATUNGRAM SAN XIX1 |
Completion of work |
-
latitude : 23.61763052176684,23.61763052176684
Longitude : 88.11928943730891,88.11928943730891
file name : Image_19072022145003680.png
|
2022-07-19 14:50:03.786584 |
81 |
49081006 |
PCC ROAD (INCLUDING DRAIN) PABITRA GAIN TO NARAYAN MONDAL AT BIKIHAT SAN XII |
71445 |
PCC ROAD (INCLUDING DRAIN) PABITRA GAIN TO NARAYAN MONDAL AT BIKIHAT SAN XII1 |
Roof laid |
-
latitude : 23.62289029173553,23.62289029173553
Longitude : 88.14790148288012,88.14790148288012
file name : Image_24072022112853281.png
|
2022-07-24 11:28:53.370165 |
82 |
49081006 |
PCC ROAD (INCLUDING DRAIN) PABITRA GAIN TO NARAYAN MONDAL AT BIKIHAT SAN XII |
71445 |
PCC ROAD (INCLUDING DRAIN) PABITRA GAIN TO NARAYAN MONDAL AT BIKIHAT SAN XII1 |
Plinth level |
-
latitude : 23.622826505452394,23.622826505452394
Longitude : 88.14806384034455,88.14806384034455
file name : Image_24072022112612514.png
|
2022-07-24 11:26:12.613214 |
83 |
49081006 |
PCC ROAD (INCLUDING DRAIN) PABITRA GAIN TO NARAYAN MONDAL AT BIKIHAT SAN XII |
71445 |
PCC ROAD (INCLUDING DRAIN) PABITRA GAIN TO NARAYAN MONDAL AT BIKIHAT SAN XII1 |
Completion of work |
-
latitude : 23.622793690301478,23.622793690301478
Longitude : 88.14807591028512,88.14807591028512
file name : Image_14072022093536372.png
|
2022-07-14 09:35:36.503069 |
84 |
49118361 |
PUCCA DRAIN BUDDHA ASROM TO SUKDEB BRAMACHARAYA AT MONDALHAT SAN VII |
349093 |
PUCCA DRAIN BUDDHA ASROM TO SUKDEB BRAMACHARAYA AT MONDALHAT SAN VII1 |
Roof laid |
-
latitude : 23.62609368748963,23.62609368748963
Longitude : 88.14849073067307,88.14849073067307
file name : Image_06072022101016655.png
|
2022-07-06 10:10:16.763163 |
85 |
49118361 |
PUCCA DRAIN BUDDHA ASROM TO SUKDEB BRAMACHARAYA AT MONDALHAT SAN VII |
349093 |
PUCCA DRAIN BUDDHA ASROM TO SUKDEB BRAMACHARAYA AT MONDALHAT SAN VII1 |
Completion of work |
-
latitude : 23.62660489976406,23.62660682760179
Longitude : 88.14834647811949,88.14834471791983
file name : Image_09032022100601672.png
|
2022-03-09 10:06:01.765043 |
86 |
49084933 |
PCC ROAD HARI KISHOR TO SUSHANTA MAJUMDER AT PANUHAT BARUJIBI COLONY SAN VI |
73511 |
PCC ROAD HARI KISHOR TO SUSHANTA MAJUMDER AT PANUHAT BARUJIBI COLONY SAN VI1 |
Roof laid |
-
latitude : 23.6298995,23.6298995
Longitude : 88.1440588,88.1440588
file name : Image_24072022113620721.png
|
2022-07-24 11:36:20.834889 |
87 |
49084933 |
PCC ROAD HARI KISHOR TO SUSHANTA MAJUMDER AT PANUHAT BARUJIBI COLONY SAN VI |
73511 |
PCC ROAD HARI KISHOR TO SUSHANTA MAJUMDER AT PANUHAT BARUJIBI COLONY SAN VI1 |
Plinth level |
-
latitude : 23.6299752,23.6299752
Longitude : 88.1446028,88.1446028
file name : Image_24072022113431340.png
|
2022-07-24 11:34:31.433648 |
88 |
49084933 |
PCC ROAD HARI KISHOR TO SUSHANTA MAJUMDER AT PANUHAT BARUJIBI COLONY SAN VI |
73511 |
PCC ROAD HARI KISHOR TO SUSHANTA MAJUMDER AT PANUHAT BARUJIBI COLONY SAN VI1 |
Completion of work |
-
latitude : 23.6297171,23.6297171
Longitude : 88.1445649,88.1445649
file name : Image_14072022092215444.png
|
2022-07-14 09:22:15.620082 |
89 |
49085749 |
PCC ROAD WITH DRAIN BISWANATH DAS TO CHOWDHURY PUKUR AT PANUHAT BOWALIYA PARA SAN V |
246067 |
PCC ROAD WITH DRAIN BISWANATH DAS TO CHOWDHURY PUKUR AT PANUHAT BOWALIYA PARA SAN V1 |
Roof laid |
-
latitude : 23.629146,23.629146
Longitude : 88.1402637,88.1402637
file name : Image_24072022114728803.png
|
2022-07-24 11:47:28.915693 |
90 |
49085749 |
PCC ROAD WITH DRAIN BISWANATH DAS TO CHOWDHURY PUKUR AT PANUHAT BOWALIYA PARA SAN V |
246067 |
PCC ROAD WITH DRAIN BISWANATH DAS TO CHOWDHURY PUKUR AT PANUHAT BOWALIYA PARA SAN V1 |
Plinth level |
-
latitude : 23.6293764,23.6293764
Longitude : 88.1399152,88.1399152
file name : Image_24072022114511772.png
|
2022-07-24 11:45:11.891208 |
91 |
49085749 |
PCC ROAD WITH DRAIN BISWANATH DAS TO CHOWDHURY PUKUR AT PANUHAT BOWALIYA PARA SAN V |
246067 |
PCC ROAD WITH DRAIN BISWANATH DAS TO CHOWDHURY PUKUR AT PANUHAT BOWALIYA PARA SAN V1 |
Completion of work |
-
latitude : 23.6294044,23.6294044
Longitude : 88.1398903,88.1398903
file name : Image_19072022104044152.png
|
2022-07-19 10:40:44.304704 |
92 |
49085509 |
REAPIRING OF PCC ROAD BRINDABAN GHOSH TO GOUR HAZRA AT MONDALHAT SAN VII |
295166 |
REAPIRING OF PCC ROAD BRINDABAN GHOSH TO GOUR HAZRA AT MONDALHAT SAN VII1 |
Roof laid |
-
latitude : 23.62709662411362,23.62709662411362
Longitude : 88.14280578866601,88.14280578866601
file name : Image_24072022115449649.png
|
2022-07-24 11:54:49.745924 |
93 |
49085509 |
REAPIRING OF PCC ROAD BRINDABAN GHOSH TO GOUR HAZRA AT MONDALHAT SAN VII |
295166 |
REAPIRING OF PCC ROAD BRINDABAN GHOSH TO GOUR HAZRA AT MONDALHAT SAN VII1 |
Plinth level |
-
latitude : 23.627101234160364,23.627101234160364
Longitude : 88.14283336512744,88.14283336512744
file name : Image_24072022115328035.png
|
2022-07-24 11:53:28.128535 |
94 |
49085509 |
REAPIRING OF PCC ROAD BRINDABAN GHOSH TO GOUR HAZRA AT MONDALHAT SAN VII |
295166 |
REAPIRING OF PCC ROAD BRINDABAN GHOSH TO GOUR HAZRA AT MONDALHAT SAN VII1 |
Completion of work |
-
latitude : 23.627657876349986,23.627657876349986
Longitude : 88.1428773701191,88.1428773701191
file name : Image_19072022103327644.png
|
2022-07-19 10:33:27.743073 |
95 |
49085986 |
PCC ROAD WITH DRAIN SAWJAMAL SK TO UTTAM MONDAL AT PANUHAT BOWALIYA PARA SAN V |
107345 |
PCC ROAD WITH DRAIN SAWJAMAL SK TO UTTAM MONDAL AT PANUHAT BOWALIYA PARA SAN V1 |
Completion of work |
-
latitude : 23.628727910108864,23.628729041665792
Longitude : 88.13940592110157,88.13940851949155
file name : Image_09032022122023737.png
|
2022-03-09 12:20:23.859482 |
96 |
49083860 |
PCC ROAD WITH DRAIN STATIOUM ROAD TO HACHIBA BIBI AT PANUHAT SAN IV |
57008 |
PCC ROAD WITH DRAIN STATIOUM ROAD TO HACHIBA BIBI AT PANUHAT SAN IV1 |
Completion of work |
-
latitude : 23.633061,23.633061
Longitude : 88.1411592,88.1411592
file name : Image_12032022100233233.png
|
2022-03-12 10:02:33.315514 |
97 |
49089460 |
CONSTRUCTION OF PCC ROAD BABLU SK TO FAKIR SK AT NATUNGRAM SAN XIX |
46893 |
CONSTRUCTION OF PCC ROAD BABLU SK TO FAKIR SK AT NATUNGRAM SAN XIX1 |
Roof laid |
-
latitude : 23.608490475453436,23.608488673344254
Longitude : 88.13718102872372,88.13717046752572
file name : Image_07072022164010832.png
|
2022-07-07 16:40:10.943361 |
98 |
58899582 |
REPAIRING OF PCC ROAD FROM COLD STORAGE TO CANEL CULVERT AT KHAJURDIHI SAN XVIII |
157505 |
REPAIRING OF PCC ROAD FROM COLD STORAGE TO CANEL CULVERT AT KHAJURDIHI SAN XVIII1 |
Roof laid |
-
latitude : 23.6200385,23.6200385
Longitude : 88.130154,88.130154
file name : Image_18032023121312072.png
|
2023-03-18 12:13:12.177119 |
99 |
58899582 |
REPAIRING OF PCC ROAD FROM COLD STORAGE TO CANEL CULVERT AT KHAJURDIHI SAN XVIII |
157505 |
REPAIRING OF PCC ROAD FROM COLD STORAGE TO CANEL CULVERT AT KHAJURDIHI SAN XVIII1 |
Plinth level |
-
latitude : 23.61845530103892,23.61845530103892
Longitude : 88.13053803518414,88.13053803518414
file name : Image_18032023121140309.png
|
2023-03-18 12:11:40.402857 |
100 |
58899582 |
REPAIRING OF PCC ROAD FROM COLD STORAGE TO CANEL CULVERT AT KHAJURDIHI SAN XVIII |
157505 |
REPAIRING OF PCC ROAD FROM COLD STORAGE TO CANEL CULVERT AT KHAJURDIHI SAN XVIII1 |
Completion of work |
-
latitude : 23.6199501,23.6199501
Longitude : 88.1302219,88.1302219
file name : Image_06032023120131982.png
|
2023-03-06 12:01:32.069508 |
101 |
58903926 |
REPAIRING OF PCC ROAD FROM BADANA SAMANTA TO MAHIM SK AT KHAJURDIHI DAKSHIN MUSLIM PARA SAN XIV |
63950 |
REPAIRING OF PCC ROAD FROM BADANA SAMANTA TO MAHIM SK AT KHAJURDIHI DAKSHIN MUSLIM PARA SAN XIV1 |
Roof laid |
-
latitude : 23.628687,23.628687
Longitude : 88.12596,88.12596
file name : Image_24032023125947998.png
|
2023-03-24 12:59:48.110488 |
102 |
58903926 |
REPAIRING OF PCC ROAD FROM BADANA SAMANTA TO MAHIM SK AT KHAJURDIHI DAKSHIN MUSLIM PARA SAN XIV |
63950 |
REPAIRING OF PCC ROAD FROM BADANA SAMANTA TO MAHIM SK AT KHAJURDIHI DAKSHIN MUSLIM PARA SAN XIV1 |
Plinth level |
-
latitude : 23.628687,23.628687
Longitude : 88.12596,88.12596
file name : Image_24032023125655315.png
|
2023-03-24 12:56:55.423525 |
103 |
58903926 |
REPAIRING OF PCC ROAD FROM BADANA SAMANTA TO MAHIM SK AT KHAJURDIHI DAKSHIN MUSLIM PARA SAN XIV |
63950 |
REPAIRING OF PCC ROAD FROM BADANA SAMANTA TO MAHIM SK AT KHAJURDIHI DAKSHIN MUSLIM PARA SAN XIV1 |
Completion of work |
-
latitude : 23.6201174,23.6201184
Longitude : 88.1243453,88.1243502
file name : Image_06032023121117270.png
|
2023-03-06 12:11:17.361256 |
104 |
58898431 |
REPAIRING OF PCC ROAD FROM AOULAD SK TO KALITALA AT KHAJURDIHI SAN XVII |
110990 |
REPAIRING OF PCC ROAD FROM AOULAD SK TO KALITALA AT KHAJURDIHI SAN XVII1 |
Roof laid |
-
latitude : 23.61585774924606,23.61585774924606
Longitude : 88.12215277925134,88.12215277925134
file name : Image_24032023131316531.png
|
2023-03-24 13:13:16.628127 |
105 |
58898431 |
REPAIRING OF PCC ROAD FROM AOULAD SK TO KALITALA AT KHAJURDIHI SAN XVII |
110990 |
REPAIRING OF PCC ROAD FROM AOULAD SK TO KALITALA AT KHAJURDIHI SAN XVII1 |
Plinth level |
-
latitude : 23.6161635,23.6161635
Longitude : 88.1221019,88.1221019
file name : Image_24032023131054427.png
|
2023-03-24 13:10:54.516831 |
106 |
58898431 |
REPAIRING OF PCC ROAD FROM AOULAD SK TO KALITALA AT KHAJURDIHI SAN XVII |
110990 |
REPAIRING OF PCC ROAD FROM AOULAD SK TO KALITALA AT KHAJURDIHI SAN XVII1 |
Completion of work |
-
latitude : 23.615815294906497,23.615815294906497
Longitude : 88.12219167128205,88.12219167128205
file name : Image_06032023120705407.png
|
2023-03-06 12:07:05.501284 |
107 |
58915011 |
REPAIRING OF PCC ROAD FROM UTTAM DEBNATH TO DEBASHIS MONDAL AT PANUHAT SAN V |
154300 |
REPAIRING OF PCC ROAD FROM UTTAM DEBNATH TO DEBASHIS MONDAL AT PANUHAT SAN V1 |
Roof laid |
-
latitude : 23.6298947,23.6298947
Longitude : 88.1434934,88.1434934
file name : Image_23032023104038376.png
|
2023-03-23 10:40:38.470518 |
108 |
58915011 |
REPAIRING OF PCC ROAD FROM UTTAM DEBNATH TO DEBASHIS MONDAL AT PANUHAT SAN V |
154300 |
REPAIRING OF PCC ROAD FROM UTTAM DEBNATH TO DEBASHIS MONDAL AT PANUHAT SAN V1 |
Plinth level |
-
latitude : 23.6303052,23.6303052
Longitude : 88.1425017,88.1425017
file name : Image_23032023103839991.png
|
2023-03-23 10:38:40.082929 |
109 |
58915011 |
REPAIRING OF PCC ROAD FROM UTTAM DEBNATH TO DEBASHIS MONDAL AT PANUHAT SAN V |
154300 |
REPAIRING OF PCC ROAD FROM UTTAM DEBNATH TO DEBASHIS MONDAL AT PANUHAT SAN V1 |
Completion of work |
-
latitude : 23.6301517,23.6301517
Longitude : 88.142996,88.142996
file name : Image_12032023095558375.png
|
2023-03-12 09:55:58.467045 |
110 |
58910798 |
REPAIRING OF PCC ROAD FROM NUR ALI SK TO EKTA SANGHA AT PANUHAT SAN IV |
126126 |
REPAIRING OF PCC ROAD FROM NUR ALI SK TO EKTA SANGHA AT PANUHAT SAN IV1 |
Roof laid |
-
latitude : 23.63156225066632,23.63156225066632
Longitude : 88.1418841984123,88.1418841984123
file name : Image_27032023113908567.png
|
2023-03-27 11:39:08.668851 |
111 |
58910798 |
REPAIRING OF PCC ROAD FROM NUR ALI SK TO EKTA SANGHA AT PANUHAT SAN IV |
126126 |
REPAIRING OF PCC ROAD FROM NUR ALI SK TO EKTA SANGHA AT PANUHAT SAN IV1 |
Plinth level |
-
latitude : 23.63154372666031,23.63154372666031
Longitude : 88.14176777377725,88.14176777377725
file name : Image_27032023113741093.png
|
2023-03-27 11:37:41.175249 |
112 |
58910798 |
REPAIRING OF PCC ROAD FROM NUR ALI SK TO EKTA SANGHA AT PANUHAT SAN IV |
126126 |
REPAIRING OF PCC ROAD FROM NUR ALI SK TO EKTA SANGHA AT PANUHAT SAN IV1 |
Completion of work |
-
latitude : 23.6311355,23.6311355
Longitude : 88.1424051,88.1424051
file name : Image_17032023113907861.png
|
2023-03-17 11:39:07.978558 |
113 |
58912998 |
CONST OF PCC ROAD FROM ALAI SK TO ALIM SK AT PANUHAT DANGA PARA SAN II |
130173 |
CONST OF PCC ROAD FROM ALAI SK TO ALIM SK AT PANUHAT DANGA PARA SAN II1 |
Roof laid |
-
latitude : 23.627390409819782,23.627390409819782
Longitude : 88.13709888607264,88.13709888607264
file name : Image_27032023114836820.png
|
2023-03-27 11:48:36.959751 |
114 |
58912998 |
CONST OF PCC ROAD FROM ALAI SK TO ALIM SK AT PANUHAT DANGA PARA SAN II |
130173 |
CONST OF PCC ROAD FROM ALAI SK TO ALIM SK AT PANUHAT DANGA PARA SAN II1 |
Plinth level |
-
latitude : 23.62740206066519,23.62740206066519
Longitude : 88.13709544949234,88.13709544949234
file name : Image_27032023114705675.png
|
2023-03-27 11:47:05.76965 |
115 |
58912998 |
CONST OF PCC ROAD FROM ALAI SK TO ALIM SK AT PANUHAT DANGA PARA SAN II |
130173 |
CONST OF PCC ROAD FROM ALAI SK TO ALIM SK AT PANUHAT DANGA PARA SAN II1 |
Completion of work |
-
latitude : 23.6284586,23.6284586
Longitude : 88.1381589,88.1381589
file name : Image_12032023100239311.png
|
2023-03-12 10:02:39.400287 |
116 |
57663720 |
CONST OF COVER DRAIN WIT SOAKPIT FROM KHOKAN GHOSHAL TO DILIP MUKHERJEE AT KHAJURDIHI KAYASTHA PARA |
101102 |
CONST OF COVER DRAIN WIT SOAKPIT FROM KHOKAN GHOSHAL TO DILIP MUKHERJEE AT KHAJURDIHI KAYASTHA PARA1 |
Completion of work |
-
latitude : 23.619481162168086,23.619481162168086
Longitude : 88.12175195664167,88.12175195664167
file name : Image_06032023121409813.png
|
2023-03-06 12:14:09.907759 |
117 |
57665525 |
CONST OF COVER DRAIN WITH SOAKPIT FROM MASJID TO LALBANU AT NATUNGRAM SAN XIX |
286619 |
CONST OF COVER DRAIN WITH SOAKPIT FROM MASJID TO LALBANU AT NATUNGRAM SAN XIX1 |
Completion of work |
-
latitude : 23.60556984320283,23.60556984320283
Longitude : 88.13528990373015,88.13528990373015
file name : Image_18032023120228217.png
|
2023-03-18 12:02:28.315535 |
118 |
49135264 |
INSTALLATION OF SOLAR SYSTEM DRINKING WATER SUPPLY SCHEME AT KHAJURDIHI SAN XVII |
793699 |
INSTALLATION OF SOLAR SYSTEM DRINKING WATER SUPPLY SCHEME AT KHAJURDIHI SAN XVII1 |
Roof laid |
-
latitude : 23.613595473580062
Longitude : 88.12015252187848
file name : Image_22072022160108831.png
|
2022-07-22 16:01:08.950514 |
119 |
49135264 |
INSTALLATION OF SOLAR SYSTEM DRINKING WATER SUPPLY SCHEME AT KHAJURDIHI SAN XVII |
793699 |
INSTALLATION OF SOLAR SYSTEM DRINKING WATER SUPPLY SCHEME AT KHAJURDIHI SAN XVII1 |
Plinth level |
-
latitude : 23.613562029786408
Longitude : 88.1201375182718
file name : Image_18072022122351034.png
|
2022-07-18 12:23:51.139622 |
120 |
49135264 |
INSTALLATION OF SOLAR SYSTEM DRINKING WATER SUPPLY SCHEME AT KHAJURDIHI SAN XVII |
793699 |
INSTALLATION OF SOLAR SYSTEM DRINKING WATER SUPPLY SCHEME AT KHAJURDIHI SAN XVII1 |
Completion of work |
-
latitude : 23.61354249995202
Longitude : 88.12009594403207
file name : Image_18072022121942691.png
|
2022-07-18 12:19:42.797574 |
121 |
58907975 |
CONST OF PCC ROAD FROM THE HOUSE OF HARIPADA MONDAL TO SUDHIR MONDAL BARUJIBI COLONY SAN VI |
221018 |
CONST OF PCC ROAD FROM THE HOUSE OF HARIPADA MONDAL TO SUDHIR MONDAL BARUJIBI COLONY SAN VI1 |
Completion of work |
-
latitude : 23.6283922,23.6283922
Longitude : 88.1432172,88.1432172
file name : Image_30032023192221445.png
|
2023-03-30 19:22:22.097273 |
122 |
58925987 |
REPAIRING OF PCC ROAD FROM SHIVTALA TO SUDHIR DEBNATH AT MONDALHAT SAN VII |
309928 |
REPAIRING OF PCC ROAD FROM SHIVTALA TO SUDHIR DEBNATH AT MONDALHAT SAN VII1 |
Plinth level |
-
latitude : 23.6284016,23.6284016
Longitude : 88.1432074,88.1432074
file name : Image_24042023224531703.png
|
2023-04-24 22:45:32.499618 |
123 |
58925987 |
REPAIRING OF PCC ROAD FROM SHIVTALA TO SUDHIR DEBNATH AT MONDALHAT SAN VII |
309928 |
REPAIRING OF PCC ROAD FROM SHIVTALA TO SUDHIR DEBNATH AT MONDALHAT SAN VII1 |
Completion of work |
-
latitude : 23.6284021,23.6284021
Longitude : 88.1432105,88.1432105
file name : Image_24042023224320277.png
|
2023-04-24 22:43:21.11117 |
124 |
66586857 |
Creation of drainage channel for management of grey water |
80836 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.6284105
Longitude : 88.143204
file name : Image_24042023225709451.png
|
2023-04-24 22:57:10.203482 |
125 |
66586857 |
Creation of drainage channel for management of grey water |
80836 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.6284061
Longitude : 88.1432105
file name : Image_24042023225551038.png
|
2023-04-24 22:55:51.799441 |
126 |
57683178 |
RESINKING AND MAINTANANCE OF GP TUBE WELL |
1198500 |
RESINKING AND MAINTANANCE OF GP TUBE WELL1 |
Completion of work |
-
latitude : 23.6286598
Longitude : 88.1259971
file name : Image_06052023133126181.png
|
2023-05-06 13:31:26.948124 |
127 |
57680259 |
SOLAR SYSTEM DRINKING WATER PROJECT AT KHAJURDIHI HARI SAGAR PAR SAN XIII |
793699 |
SOLAR SYSTEM DRINKING WATER PROJECT AT KHAJURDIHI HARI SAGAR PAR SAN XIII1 |
Roof laid |
-
latitude : 23.622343624010682
Longitude : 88.1133578158915
file name : Image_12052023140542199.png
|
2023-05-12 14:05:42.295343 |
128 |
57680259 |
SOLAR SYSTEM DRINKING WATER PROJECT AT KHAJURDIHI HARI SAGAR PAR SAN XIII |
793699 |
SOLAR SYSTEM DRINKING WATER PROJECT AT KHAJURDIHI HARI SAGAR PAR SAN XIII1 |
Plinth level |
-
latitude : 23.622309803031385
Longitude : 88.11332822777331
file name : Image_12052023140331725.png
|
2023-05-12 14:03:31.835628 |
129 |
57680259 |
SOLAR SYSTEM DRINKING WATER PROJECT AT KHAJURDIHI HARI SAGAR PAR SAN XIII |
793699 |
SOLAR SYSTEM DRINKING WATER PROJECT AT KHAJURDIHI HARI SAGAR PAR SAN XIII1 |
Completion of work |
-
latitude : 23.622319735586643
Longitude : 88.11325212009251
file name : Image_29032023151650177.png
|
2023-03-29 15:16:50.281681 |
130 |
58935367 |
CONST OF PUCCA GHAT WITH PCC ROAD BESIDE MATURA PUKUR NEAR THE HOUSE OF MINATI BANERJEE |
126524 |
CONST OF PUCCA GHAT WITH PCC ROAD BESIDE MATURA PUKUR NEAR THE HOUSE OF MINATI BANERJEE 1 |
Roof laid |
-
latitude : 23.618585974909365,23.618585974909365
Longitude : 88.12039216049016,88.12039216049016
file name : Image_12052023133902174.png
|
2023-05-12 13:39:02.271691 |
131 |
58935367 |
CONST OF PUCCA GHAT WITH PCC ROAD BESIDE MATURA PUKUR NEAR THE HOUSE OF MINATI BANERJEE |
126524 |
CONST OF PUCCA GHAT WITH PCC ROAD BESIDE MATURA PUKUR NEAR THE HOUSE OF MINATI BANERJEE 1 |
Plinth level |
-
latitude : 23.61855982337147,23.61855982337147
Longitude : 88.12039417214692,88.12039417214692
file name : Image_12052023133605987.png
|
2023-05-12 13:36:06.082484 |
132 |
58935367 |
CONST OF PUCCA GHAT WITH PCC ROAD BESIDE MATURA PUKUR NEAR THE HOUSE OF MINATI BANERJEE |
126524 |
CONST OF PUCCA GHAT WITH PCC ROAD BESIDE MATURA PUKUR NEAR THE HOUSE OF MINATI BANERJEE 1 |
Completion of work |
-
latitude : 23.61858480144292,23.61858480144292
Longitude : 88.12028755433857,88.12028755433857
file name : Image_12052023133304610.png
|
2023-05-12 13:33:04.717997 |
133 |
34554381 |
Pucca Drain with Cover Rebati Biswasto Dhiren daraniat panuhatSAN iii |
221638 |
Pucca Drain with Cover Rebati Biswasto Dhiren daraniat panuhatSAN iii1 |
Roof laid |
-
latitude : 23.6316716,23.6316716
Longitude : 88.1418794,88.1418794
file name : Image_07092021133034132.png
|
2021-09-07 13:30:34.240822 |
134 |
34554381 |
Pucca Drain with Cover Rebati Biswasto Dhiren daraniat panuhatSAN iii |
221638 |
Pucca Drain with Cover Rebati Biswasto Dhiren daraniat panuhatSAN iii1 |
Plinth level |
-
latitude : 23.6316172,23.6316172
Longitude : 88.1419291,88.1419291
file name : Image_07092021132903151.png
|
2021-09-07 13:29:03.245723 |
135 |
34554381 |
Pucca Drain with Cover Rebati Biswasto Dhiren daraniat panuhatSAN iii |
221638 |
Pucca Drain with Cover Rebati Biswasto Dhiren daraniat panuhatSAN iii1 |
Completion of work |
-
latitude : 23.6316471,23.6316471
Longitude : 88.1419337,88.1419337
file name : Image_18082021133931503.png
|
2021-08-18 13:39:31.606164 |
136 |
34582531 |
PCC road Sadhan Mondal to Sujay Biswas at Bikihat SAN XII |
153289 |
PCC road Sadhan Mondal to Sujay Biswas at Bikihat SAN XII 1 |
Roof laid |
-
latitude : 23.6199221,23.6199221
Longitude : 88.1522079,88.1522079
file name : Image_07092021131831740.png
|
2021-09-07 13:18:31.841062 |
137 |
34582531 |
PCC road Sadhan Mondal to Sujay Biswas at Bikihat SAN XII |
153289 |
PCC road Sadhan Mondal to Sujay Biswas at Bikihat SAN XII 1 |
Plinth level |
-
latitude : 23.6199224,23.6199224
Longitude : 88.1522084,88.1522084
file name : Image_07092021131633271.png
|
2021-09-07 13:16:33.373173 |
138 |
34582531 |
PCC road Sadhan Mondal to Sujay Biswas at Bikihat SAN XII |
153289 |
PCC road Sadhan Mondal to Sujay Biswas at Bikihat SAN XII 1 |
Completion of work |
-
latitude : 23.62053313292563,23.62053313292563
Longitude : 88.15212428569794,88.15212428569794
file name : Image_18082021135253496.png
|
2021-08-18 13:52:53.603793 |
139 |
34605383 |
Pucca Drain with Cover Ibrahim skto Natumhat talaat KhajurdihiSAN xvi |
235632 |
Pucca Drain with Cover Ibrahim skto Natumhat talaat KhajurdihiSAN xvi1 |
Roof laid |
-
latitude : 23.615843835286796,23.615843835286796
Longitude : 88.12103345990181,88.12103345990181
file name : Image_24022021144953580.png
|
2021-02-24 14:49:53.683355 |
140 |
34605383 |
Pucca Drain with Cover Ibrahim skto Natumhat talaat KhajurdihiSAN xvi |
235632 |
Pucca Drain with Cover Ibrahim skto Natumhat talaat KhajurdihiSAN xvi1 |
Plinth level |
-
latitude : 23.615858713164926,23.615858713164926
Longitude : 88.12101937830448,88.12101937830448
file name : Image_24022021144522635.png
|
2021-02-24 14:45:22.735274 |
141 |
34605383 |
Pucca Drain with Cover Ibrahim skto Natumhat talaat KhajurdihiSAN xvi |
235632 |
Pucca Drain with Cover Ibrahim skto Natumhat talaat KhajurdihiSAN xvi1 |
Completion of work |
-
latitude : 23.61593565903604,23.61592899542302
Longitude : 88.12046365812421,88.12049333006144
file name : Image_29012021123244782.png
|
2021-01-29 12:32:44.888366 |
142 |
34534909 |
PCC road Akbar Sk to Babu sk at Panuhat Dangapara |
220671 |
PCC road Akbar Sk to Babu sk at Panuhat Dangapara1 |
Roof laid |
-
latitude : 23.626541742123663,23.626538263633847
Longitude : 88.13933392055333,88.13933576457202
file name : Image_03022021134910935.png
|
2021-02-03 13:49:11.05029 |
143 |
34534909 |
PCC road Akbar Sk to Babu sk at Panuhat Dangapara |
220671 |
PCC road Akbar Sk to Babu sk at Panuhat Dangapara1 |
Plinth level |
-
latitude : 23.62672316841781,23.626854638569057
Longitude : 88.13913024030626,88.13908237963915
file name : Image_03022021134647856.png
|
2021-02-03 13:46:47.962343 |
144 |
34534909 |
PCC road Akbar Sk to Babu sk at Panuhat Dangapara |
220671 |
PCC road Akbar Sk to Babu sk at Panuhat Dangapara1 |
Completion of work |
-
latitude : 23.626848771236837,23.626848896965384
Longitude : 88.13908950425684,88.13908958807588
file name : Image_24012021105833624.png
|
2021-01-24 10:58:33.733163 |
145 |
34599036 |
pPucca Drain with Cover Anukul hazrato sukhor sardarat KhajurdihiSAN xiii |
274441 |
pPucca Drain with Cover Anukul hazrato sukhor sardarat KhajurdihiSAN xiii1 |
Roof laid |
-
latitude : 23.61886597238481,23.61886597238481
Longitude : 88.1181262806058,88.1181262806058
file name : Image_24022021143714443.png
|
2021-02-24 14:37:14.543239 |
146 |
34599036 |
pPucca Drain with Cover Anukul hazrato sukhor sardarat KhajurdihiSAN xiii |
274441 |
pPucca Drain with Cover Anukul hazrato sukhor sardarat KhajurdihiSAN xiii1 |
Plinth level |
-
latitude : 23.620815183967352,23.620826373808086
Longitude : 88.11624596826732,88.11624043621123
file name : Image_15022021124950058.png
|
2021-02-15 12:49:50.150873 |
147 |
34599036 |
pPucca Drain with Cover Anukul hazrato sukhor sardarat KhajurdihiSAN xiii |
274441 |
pPucca Drain with Cover Anukul hazrato sukhor sardarat KhajurdihiSAN xiii1 |
Completion of work |
-
latitude : 23.6211946,23.62084070686251
Longitude : 88.117393,88.11626591719687
file name : Image_29012021121936784.png
|
2021-01-29 12:19:36.878144 |
148 |
34562107 |
PCC road Sridhar Boidya to Sukdeb Debnath at CHARPAUHAT SAN IX |
255990 |
PCC road Sridhar Boidya to Sukdeb Debnath at CHARPAUHAT SAN IX 1 |
Roof laid |
-
latitude : 23.629518700763583,23.629518700763583
Longitude : 88.14924862235785,88.14924862235785
file name : Image_16072021090526110.png
|
2021-07-16 09:05:26.188513 |
149 |
34562107 |
PCC road Sridhar Boidya to Sukdeb Debnath at CHARPAUHAT SAN IX |
255990 |
PCC road Sridhar Boidya to Sukdeb Debnath at CHARPAUHAT SAN IX 1 |
Plinth level |
-
latitude : 23.629540954716504,23.629540954716504
Longitude : 88.14928323961794,88.14928323961794
file name : Image_16072021090325774.png
|
2021-07-16 09:03:25.856739 |
150 |
34562107 |
PCC road Sridhar Boidya to Sukdeb Debnath at CHARPAUHAT SAN IX |
255990 |
PCC road Sridhar Boidya to Sukdeb Debnath at CHARPAUHAT SAN IX 1 |
Completion of work |
-
latitude : 23.62937335856259,23.62937335856259
Longitude : 88.14931190572679,88.14931190572679
file name : Image_20062021095513054.png
|
2021-06-20 09:55:13.154775 |
151 |
34571237 |
PCC road from the land of Jatin Mondal to the Land of Sudhir Mondal at mondalhat SAN VII |
296471 |
PCC road from the land of Jatin Mondal to the Land of Sudhir Mondal at mondalhat SAN VII 1 |
Roof laid |
-
latitude : 23.627687799744308,23.627687799744308
Longitude : 88.148408588022,88.148408588022
file name : Image_16072021085441066.png
|
2021-07-16 08:54:41.173482 |
152 |
34571237 |
PCC road from the land of Jatin Mondal to the Land of Sudhir Mondal at mondalhat SAN VII |
296471 |
PCC road from the land of Jatin Mondal to the Land of Sudhir Mondal at mondalhat SAN VII 1 |
Plinth level |
-
latitude : 23.62766412086785,23.62766370177269
Longitude : 88.14831571653485,88.14829853363335
file name : Image_16072021085328317.png
|
2021-07-16 08:53:28.436736 |
153 |
34571237 |
PCC road from the land of Jatin Mondal to the Land of Sudhir Mondal at mondalhat SAN VII |
296471 |
PCC road from the land of Jatin Mondal to the Land of Sudhir Mondal at mondalhat SAN VII 1 |
Completion of work |
-
latitude : 23.627665461972356,23.627665461972356
Longitude : 88.1481422111392,88.1481422111392
file name : Image_20062021094608775.png
|
2021-06-20 09:46:08.873604 |
154 |
34580040 |
PCC road Dhiren Majhi to Dulal Majhi at Bikihat SAN XII |
117702 |
PCC road Dhiren Majhi to Dulal Majhi at Bikihat SAN XII 1 |
Roof laid |
-
latitude : 23.618660615757108,23.618660531938076
Longitude : 88.14893103204668,88.14893111586571
file name : Image_07092021131229406.png
|
2021-09-07 13:12:29.496016 |
155 |
34580040 |
PCC road Dhiren Majhi to Dulal Majhi at Bikihat SAN XII |
117702 |
PCC road Dhiren Majhi to Dulal Majhi at Bikihat SAN XII 1 |
Plinth level |
-
latitude : 23.618719540536404,23.61867729574442
Longitude : 88.14891544170678,88.14890370704234
file name : Image_07092021130752062.png
|
2021-09-07 13:07:52.168601 |
156 |
34580040 |
PCC road Dhiren Majhi to Dulal Majhi at Bikihat SAN XII |
117702 |
PCC road Dhiren Majhi to Dulal Majhi at Bikihat SAN XII 1 |
Completion of work |
-
latitude : 23.618628345429897,23.618628345429897
Longitude : 88.14890932291746,88.14890932291746
file name : Image_18082021134734192.png
|
2021-08-18 13:47:34.294712 |
157 |
34624868 |
Repairing of pcc road Rajaram Ghoshal to Samir Bhatacharjee SAN XIV |
71856 |
Repairing of pcc road Rajaram Ghoshal to Samir Bhatacharjee SAN XIV 1 |
Roof laid |
-
latitude : 23.618671847507358,23.618671847507358
Longitude : 88.12117578461766,88.12117578461766
file name : Image_05022021123648423.png
|
2021-02-05 12:36:48.537384 |
158 |
34624868 |
Repairing of pcc road Rajaram Ghoshal to Samir Bhatacharjee SAN XIV |
71856 |
Repairing of pcc road Rajaram Ghoshal to Samir Bhatacharjee SAN XIV 1 |
Plinth level |
-
latitude : 23.61865189857781,23.61865189857781
Longitude : 88.12113655731082,88.12113655731082
file name : Image_05022021123517884.png
|
2021-02-05 12:35:17.98019 |
159 |
34624868 |
Repairing of pcc road Rajaram Ghoshal to Samir Bhatacharjee SAN XIV |
71856 |
Repairing of pcc road Rajaram Ghoshal to Samir Bhatacharjee SAN XIV 1 |
Completion of work |
-
latitude : 23.6188061,23.618627591058612
Longitude : 88.1196195,88.12114234082401
file name : Image_29122020134205501.png
|
2020-12-29 13:42:05.637428 |
160 |
34625693 |
Repairing PCC road Asit chandra to Khosbari sk at KhajurdihiSAN xiv |
191900 |
Repairing PCC road Asit chandra to Khosbari sk at KhajurdihiSAN xiv1 |
Roof laid |
-
latitude : 23.6183655,23.6183655
Longitude : 88.1219104,88.1219104
file name : Image_04022021141949266.png
|
2021-02-04 14:19:49.353447 |
161 |
34625693 |
Repairing PCC road Asit chandra to Khosbari sk at KhajurdihiSAN xiv |
191900 |
Repairing PCC road Asit chandra to Khosbari sk at KhajurdihiSAN xiv1 |
Plinth level |
-
latitude : 23.6183645,23.6183632
Longitude : 88.1219102,88.1219089
file name : Image_04022021141641948.png
|
2021-02-04 14:16:42.042273 |
162 |
34625693 |
Repairing PCC road Asit chandra to Khosbari sk at KhajurdihiSAN xiv |
191900 |
Repairing PCC road Asit chandra to Khosbari sk at KhajurdihiSAN xiv1 |
Completion of work |
-
latitude : 23.6182758,23.6182784
Longitude : 88.1219467,88.1219533
file name : Image_29122020134045881.png
|
2020-12-29 13:40:46.004734 |
163 |
34625693 |
Repairing PCC road Asit chandra to Khosbari sk at KhajurdihiSAN xiv |
191900 |
Repairing PCC road Asit chandra to Khosbari sk at KhajurdihiSAN xiv1 |
Completion of work |
-
latitude : 23.6182758,23.6182784
Longitude : 88.1219467,88.1219533
file name : Image_29122020134055019.png
|
2020-12-29 13:40:55.123239 |
164 |
34590701 |
PCC road Chand sekh to Haru sk at Khajurdihi SAN XIII |
50873 |
PCC road Chand sekh to Haru sk at Khajurdihi SAN XIII 1 |
Roof laid |
-
latitude : 23.621859191916883,23.621859191916883
Longitude : 88.1132547184825,88.1132547184825
file name : Image_04022021142955445.png
|
2021-02-04 14:29:55.537509 |
165 |
34590701 |
PCC road Chand sekh to Haru sk at Khajurdihi SAN XIII |
50873 |
PCC road Chand sekh to Haru sk at Khajurdihi SAN XIII 1 |
Plinth level |
-
latitude : 23.62186447251588,23.62186447251588
Longitude : 88.11320316977799,88.11320316977799
file name : Image_04022021142654642.png
|
2021-02-04 14:26:54.732836 |
166 |
34590701 |
PCC road Chand sekh to Haru sk at Khajurdihi SAN XIII |
50873 |
PCC road Chand sekh to Haru sk at Khajurdihi SAN XIII 1 |
Completion of work |
-
latitude : 23.621844900771976,23.621843769215047
Longitude : 88.11328388750553,88.11328120529652
file name : Image_29122020135925501.png
|
2020-12-29 13:59:25.627008 |
167 |
34610399 |
PCC road from STKK Road to Nachai SK at Natungram SAN XIX |
203396 |
PCC road from STKK Road to Nachai SK at Natungram SAN XIX 1 |
Roof laid |
-
latitude : 23.610268654301763,23.610268654301763
Longitude : 88.13790732063353,88.13790732063353
file name : Image_15022021125207915.png
|
2021-02-15 12:52:08.024124 |
168 |
34610399 |
PCC road from STKK Road to Nachai SK at Natungram SAN XIX |
203396 |
PCC road from STKK Road to Nachai SK at Natungram SAN XIX 1 |
Plinth level |
-
latitude : 23.610252435319126,23.610252435319126
Longitude : 88.13789952546358,88.13789952546358
file name : Image_15022021124957079.png
|
2021-02-15 12:49:57.179671 |
169 |
34610399 |
PCC road from STKK Road to Nachai SK at Natungram SAN XIX |
203396 |
PCC road from STKK Road to Nachai SK at Natungram SAN XIX 1 |
Plinth level |
-
latitude : 23.610252435319126,23.610252435319126
Longitude : 88.13789952546358,88.13789952546358
file name : Image_15022021124953326.png
|
2021-02-15 12:49:53.429419 |
170 |
34610399 |
PCC road from STKK Road to Nachai SK at Natungram SAN XIX |
203396 |
PCC road from STKK Road to Nachai SK at Natungram SAN XIX 1 |
Completion of work |
-
latitude : 23.61026006285101,23.610275401733816
Longitude : 88.13788879662752,88.13789097592235
file name : Image_30122020130619968.png
|
2020-12-30 13:06:20.046129 |
171 |
34552207 |
PCC road Avay Sengupta to Niranjan Bala at PanuhatPASCHIMPARA san III |
142692 |
PCC road Avay Sengupta to Niranjan Bala at PanuhatPASCHIMPARA san III 1 |
Roof laid |
-
latitude : 23.63141544163227,23.63141887821257
Longitude : 88.13930139876902,88.1392693798989
file name : Image_03022021133304796.png
|
2021-02-03 13:33:04.894616 |
172 |
34552207 |
PCC road Avay Sengupta to Niranjan Bala at PanuhatPASCHIMPARA san III |
142692 |
PCC road Avay Sengupta to Niranjan Bala at PanuhatPASCHIMPARA san III 1 |
Plinth level |
-
latitude : 23.631400647573173,23.63139188848436
Longitude : 88.13939879648387,88.1393972877413
file name : Image_03022021132944990.png
|
2021-02-03 13:29:45.084726 |
173 |
34552207 |
PCC road Avay Sengupta to Niranjan Bala at PanuhatPASCHIMPARA san III |
142692 |
PCC road Avay Sengupta to Niranjan Bala at PanuhatPASCHIMPARA san III 1 |
Completion of work |
-
latitude : 23.631395450793207,23.63139532506466
Longitude : 88.13941648229957,88.13941673375666
file name : Image_24012021105244867.png
|
2021-01-24 10:52:44.969225 |
174 |
34552207 |
PCC road Avay Sengupta to Niranjan Bala at PanuhatPASCHIMPARA san III |
142692 |
PCC road Avay Sengupta to Niranjan Bala at PanuhatPASCHIMPARA san III 1 |
Completion of work |
-
latitude : 23.631395450793207,23.63139532506466
Longitude : 88.13941648229957,88.13941673375666
file name : Image_24012021105235186.png
|
2021-01-24 10:52:35.286266 |
175 |
39073410 |
Pucca Drain with Cover Lichu mondalto Masjidat KhajurdihiSAN xiv |
214930 |
Pucca Drain with Cover Lichu mondalto Masjidat KhajurdihiSAN xiv1 |
Roof laid |
-
latitude : 23.616687976755202,23.616687976755202
Longitude : 88.12200567685068,88.12200567685068
file name : Image_05022021124424721.png
|
2021-02-05 12:44:24.828202 |
176 |
39073410 |
Pucca Drain with Cover Lichu mondalto Masjidat KhajurdihiSAN xiv |
214930 |
Pucca Drain with Cover Lichu mondalto Masjidat KhajurdihiSAN xiv1 |
Plinth level |
-
latitude : 23.61672167200595,23.61672167200595
Longitude : 88.12201363965869,88.12201363965869
file name : Image_05022021124239102.png
|
2021-02-05 12:42:39.206019 |
177 |
39073410 |
Pucca Drain with Cover Lichu mondalto Masjidat KhajurdihiSAN xiv |
214930 |
Pucca Drain with Cover Lichu mondalto Masjidat KhajurdihiSAN xiv1 |
Completion of work |
-
latitude : 23.628756869584322,23.617001920938492
Longitude : 88.12594668008387,88.12207742594182
file name : Image_27012021154642275.png
|
2021-01-27 15:46:42.474084 |
178 |
34567630 |
PCC road Samal Biswas to Bibhuti Biswas at Panuhat Baidyapara SAN VI |
137628 |
PCC road Samal Biswas to Bibhuti Biswas at Panuhat Baidyapara SAN VI 1 |
Completion of work |
-
latitude : 23.632520092651248,23.632520092651248
Longitude : 88.14651804976165,88.14651804976165
file name : Image_04022021111741593.png
|
2021-02-04 11:17:41.688938 |
179 |
34625453 |
Repairing PCC road kk roadto Banglapath at KhajurdihiSAN xv |
108291 |
Repairing PCC road kk roadto Banglapath at KhajurdihiSAN xv1 |
Roof laid |
-
latitude : 23.619863879866898,23.619863879866898
Longitude : 88.1197994761169,88.1197994761169
file name : Image_05022021123234664.png
|
2021-02-05 12:32:34.766995 |
180 |
34625453 |
Repairing PCC road kk roadto Banglapath at KhajurdihiSAN xv |
108291 |
Repairing PCC road kk roadto Banglapath at KhajurdihiSAN xv1 |
Plinth level |
-
latitude : 23.619892043061554,23.619892043061554
Longitude : 88.11979168094695,88.11979168094695
file name : Image_05022021122909468.png
|
2021-02-05 12:29:09.583636 |
181 |
34625453 |
Repairing PCC road kk roadto Banglapath at KhajurdihiSAN xv |
108291 |
Repairing PCC road kk roadto Banglapath at KhajurdihiSAN xv1 |
Completion of work |
-
latitude : 23.619869872927666,23.619867567904294
Longitude : 88.11920570209622,88.11921819113195
file name : Image_29122020135318028.png
|
2020-12-29 13:53:18.146962 |
182 |
34623281 |
Repairing PCC road with pileing work beside subhiksha gore at subhkisha tala KhajurdihiSAN xiii |
132958 |
Repairing PCC road with pileing work beside subhiksha gore at subhkisha tala KhajurdihiSAN xiii1 |
Roof laid |
-
latitude : 23.618697,23.618697
Longitude : 88.11914,88.11914
file name : Image_24022021143213732.png
|
2021-02-24 14:32:13.818274 |
183 |
34623281 |
Repairing PCC road with pileing work beside subhiksha gore at subhkisha tala KhajurdihiSAN xiii |
132958 |
Repairing PCC road with pileing work beside subhiksha gore at subhkisha tala KhajurdihiSAN xiii1 |
Plinth level |
-
latitude : 23.6187353,23.6187353
Longitude : 88.1191067,88.1191067
file name : Image_24022021142927219.png
|
2021-02-24 14:29:27.322642 |
184 |
34623281 |
Repairing PCC road with pileing work beside subhiksha gore at subhkisha tala KhajurdihiSAN xiii |
132958 |
Repairing PCC road with pileing work beside subhiksha gore at subhkisha tala KhajurdihiSAN xiii1 |
Plinth level |
-
latitude : 23.6187353,23.6187353
Longitude : 88.1191067,88.1191067
file name : Image_24022021142922912.png
|
2021-02-24 14:29:23.000643 |
185 |
34623281 |
Repairing PCC road with pileing work beside subhiksha gore at subhkisha tala KhajurdihiSAN xiii |
132958 |
Repairing PCC road with pileing work beside subhiksha gore at subhkisha tala KhajurdihiSAN xiii1 |
Plinth level |
-
latitude : 23.6187133,23.6187413
Longitude : 88.1192033,88.1191142
file name : Image_24022021142918710.png
|
2021-02-24 14:29:18.809067 |
186 |
34623281 |
Repairing PCC road with pileing work beside subhiksha gore at subhkisha tala KhajurdihiSAN xiii |
132958 |
Repairing PCC road with pileing work beside subhiksha gore at subhkisha tala KhajurdihiSAN xiii1 |
Completion of work |
-
latitude : 23.6187421,23.6187485
Longitude : 88.1191256,88.1191368
file name : Image_29122020134613355.png
|
2020-12-29 13:46:13.478137 |
187 |
34573306 |
PCC road Rangalal Debnath to Bamkim Debnath at mondalhat SAN VIII |
58400 |
PCC road Rangalal Debnath to Bamkim Debnath at mondalhat SAN VIII 1 |
Roof laid |
-
latitude : 23.62769588828087,23.627674807794392
Longitude : 88.14014947973192,88.14016456715763
file name : Image_31012021150037989.png
|
2021-01-31 15:00:38.073556 |
188 |
34573306 |
PCC road Rangalal Debnath to Bamkim Debnath at mondalhat SAN VIII |
58400 |
PCC road Rangalal Debnath to Bamkim Debnath at mondalhat SAN VIII 1 |
Plinth level |
-
latitude : 23.62767342478037,23.62767342478037
Longitude : 88.14017320051789,88.14017320051789
file name : Image_31012021145819646.png
|
2021-01-31 14:58:19.739279 |
189 |
34573306 |
PCC road Rangalal Debnath to Bamkim Debnath at mondalhat SAN VIII |
58400 |
PCC road Rangalal Debnath to Bamkim Debnath at mondalhat SAN VIII 1 |
Completion of work |
-
latitude : 23.627638975158334,23.627638975158334
Longitude : 88.14016180112958,88.14016180112958
file name : Image_14012021100427870.png
|
2021-01-14 10:04:27.955716 |
190 |
39073467 |
Pucca Drain with Cover sefali bibito Rasid skat natungramSAN xix |
307730 |
Pucca Drain with Cover sefali bibito Rasid skat natungramSAN xix1 |
Roof laid |
-
latitude : 23.606636691838503,23.606632919982076
Longitude : 88.13817109912634,88.1381820794195
file name : Image_24022021121347327.png
|
2021-02-24 12:13:47.307975 |
191 |
39073467 |
Pucca Drain with Cover sefali bibito Rasid skat natungramSAN xix |
307730 |
Pucca Drain with Cover sefali bibito Rasid skat natungramSAN xix1 |
Plinth level |
-
latitude : 23.606774280779064,23.606770928017795
Longitude : 88.13815299421549,88.13814712688327
file name : Image_24022021121056071.png
|
2021-02-24 12:10:56.155282 |
192 |
39073467 |
Pucca Drain with Cover sefali bibito Rasid skat natungramSAN xix |
307730 |
Pucca Drain with Cover sefali bibito Rasid skat natungramSAN xix1 |
Completion of work |
-
latitude : 23.62871521152556,23.62871521152556
Longitude : 88.126060673967,88.126060673967
file name : Image_06022021161622663.png
|
2021-02-06 16:16:22.746429 |
193 |
34608894 |
PCC road from Khajurdihi Himghor to from canel sako at SAN XVIII |
132167 |
PCC road from Khajurdihi Himghor to from canel sako at SAN XVIII 1 |
Roof laid |
-
latitude : 23.617872591130435,23.617872591130435
Longitude : 88.12988583929837,88.12988583929837
file name : Image_15022021130607023.png
|
2021-02-15 13:06:07.109911 |
194 |
34608894 |
PCC road from Khajurdihi Himghor to from canel sako at SAN XVIII |
132167 |
PCC road from Khajurdihi Himghor to from canel sako at SAN XVIII 1 |
Roof laid |
-
latitude : 23.617842625826597,23.61784635577351
Longitude : 88.12988625839353,88.12989204190671
file name : Image_15022021130500808.png
|
2021-02-15 13:05:00.889845 |
195 |
34608894 |
PCC road from Khajurdihi Himghor to from canel sako at SAN XVIII |
132167 |
PCC road from Khajurdihi Himghor to from canel sako at SAN XVIII 1 |
Plinth level |
-
latitude : 23.617923511192203,23.61792183481157
Longitude : 88.12984049320221,88.12983605079353
file name : Image_15022021130240911.png
|
2021-02-15 13:02:40.997134 |
196 |
34608894 |
PCC road from Khajurdihi Himghor to from canel sako at SAN XVIII |
132167 |
PCC road from Khajurdihi Himghor to from canel sako at SAN XVIII 1 |
Completion of work |
-
latitude : 23.6169378,23.617906873114407
Longitude : 88.1344766,88.12986362725496
file name : Image_29122020132329542.png
|
2020-12-29 13:23:29.644864 |
197 |
39071326 |
Spreading lime and bleaching at GP area |
1000001 |
Spreading lime and bleaching at GP area1 |
Roof laid |
-
latitude : 23.628476494923234
Longitude : 88.14318330958486
file name : Image_28052021155357613.png
|
2021-05-28 15:53:57.712403 |
198 |
34587981 |
PCC road Hapu skto Morsed skat KhajurdihiSAN xiii |
76741 |
PCC road Hapu skto Morsed skat KhajurdihiSAN xiii1 |
Roof laid |
-
latitude : 23.62109425943345,23.62109425943345
Longitude : 88.11380272731185,88.11380272731185
file name : Image_06022021123055402.png
|
2021-02-06 12:30:55.502918 |
199 |
34587981 |
PCC road Hapu skto Morsed skat KhajurdihiSAN xiii |
76741 |
PCC road Hapu skto Morsed skat KhajurdihiSAN xiii1 |
Plinth level |
-
latitude : 23.621118147857487,23.621118147857487
Longitude : 88.11379945836961,88.11379945836961
file name : Image_06022021122708030.png
|
2021-02-06 12:27:08.122142 |
200 |
34587981 |
PCC road Hapu skto Morsed skat KhajurdihiSAN xiii |
76741 |
PCC road Hapu skto Morsed skat KhajurdihiSAN xiii1 |
Completion of work |
-
latitude : 23.62122769933194,23.62122577149421
Longitude : 88.11373483389616,88.11373290605843
file name : Image_29122020140455252.png
|
2020-12-29 14:04:55.33939 |
201 |
34557526 |
PCC road Subhash Biswas to Amal Sarkar at CHARPAUHAT SAN IX |
307273 |
PCC road Subhash Biswas to Amal Sarkar at CHARPAUHAT SAN IX 1 |
Roof laid |
-
latitude : 23.62917231861502,23.62917231861502
Longitude : 88.14919187687337,88.14919187687337
file name : Image_16072021090111552.png
|
2021-07-16 09:01:11.645881 |
202 |
34557526 |
PCC road Subhash Biswas to Amal Sarkar at CHARPAUHAT SAN IX |
307273 |
PCC road Subhash Biswas to Amal Sarkar at CHARPAUHAT SAN IX 1 |
Plinth level |
-
latitude : 23.62890539690852,23.628894123248756
Longitude : 88.14930595457554,88.14930696040392
file name : Image_16072021085903025.png
|
2021-07-16 08:59:03.13173 |
203 |
34557526 |
PCC road Subhash Biswas to Amal Sarkar at CHARPAUHAT SAN IX |
307273 |
PCC road Subhash Biswas to Amal Sarkar at CHARPAUHAT SAN IX 1 |
Completion of work |
-
latitude : 23.62875921651721,23.62875921651721
Longitude : 88.14930930733681,88.14930930733681
file name : Image_20062021095125072.png
|
2021-06-20 09:51:25.177077 |
204 |
34606010 |
PCC road from Dakshin Muslim para kaltala to Sukur SK at Dakshin Muslim para SAN XVII |
180023 |
PCC road from Dakshin Muslim para kaltala to Sukur SK at Dakshin Muslim para SAN XVII 1 |
Roof laid |
-
latitude : 23.615647363476455,23.615647363476455
Longitude : 88.12217415310442,88.12217415310442
file name : Image_08022021122314317.png
|
2021-02-08 12:23:14.40857 |
205 |
34606010 |
PCC road from Dakshin Muslim para kaltala to Sukur SK at Dakshin Muslim para SAN XVII |
180023 |
PCC road from Dakshin Muslim para kaltala to Sukur SK at Dakshin Muslim para SAN XVII 1 |
Plinth level |
-
latitude : 23.61561626661569,23.615617817267776
Longitude : 88.1221561320126,88.12216426245868
file name : Image_06022021121112878.png
|
2021-02-06 12:11:12.956947 |
206 |
34606010 |
PCC road from Dakshin Muslim para kaltala to Sukur SK at Dakshin Muslim para SAN XVII |
180023 |
PCC road from Dakshin Muslim para kaltala to Sukur SK at Dakshin Muslim para SAN XVII 1 |
Completion of work |
-
latitude : 23.61571437679231,23.615702809765935
Longitude : 88.12225420027971,88.12224338762462
file name : Image_29122020134041423.png
|
2020-12-29 13:40:41.541727 |
207 |
39073356 |
Pucca Drain with Cover Paruli debnathto Sunil Debnathat PanuhatSAN v |
64157 |
Pucca Drain with Cover Paruli debnathto Sunil Debnathat PanuhatSAN v1 |
Roof laid |
-
latitude : 23.6300154,23.629931
Longitude : 88.1430326,88.1430279
file name : Image_30012021102127935.png
|
2021-01-30 10:21:28.01388 |
208 |
39073356 |
Pucca Drain with Cover Paruli debnathto Sunil Debnathat PanuhatSAN v |
64157 |
Pucca Drain with Cover Paruli debnathto Sunil Debnathat PanuhatSAN v1 |
Plinth level |
-
latitude : 23.6299675,23.6299133207649
Longitude : 88.1430308,88.14215769991279
file name : Image_30012021101727482.png
|
2021-01-30 10:17:27.593252 |
209 |
39073356 |
Pucca Drain with Cover Paruli debnathto Sunil Debnathat PanuhatSAN v |
64157 |
Pucca Drain with Cover Paruli debnathto Sunil Debnathat PanuhatSAN v1 |
Completion of work |
-
latitude : 23.629777156747878,23.6297449702397
Longitude : 88.14213213510811,88.14215820282698
file name : Image_28122020101039341.png
|
2020-12-28 10:10:39.424494 |
210 |
34619735 |
Repairing of pcc road Aiyub Mondal to from sk pukur at Khajurdihi SAN XVII |
172304 |
Repairing of pcc road Aiyub Mondal to from sk pukur at Khajurdihi SAN XVII 1 |
Roof laid |
-
latitude : 23.61589601263404,23.615902131423354
Longitude : 88.12304285354912,88.12303589656949
file name : Image_09022021125610136.png
|
2021-02-09 12:56:10.256555 |
211 |
34619735 |
Repairing of pcc road Aiyub Mondal to from sk pukur at Khajurdihi SAN XVII |
172304 |
Repairing of pcc road Aiyub Mondal to from sk pukur at Khajurdihi SAN XVII 1 |
Plinth level |
-
latitude : 23.6286806,23.6211983
Longitude : 88.1260335,88.1176981
file name : Image_09022021124852582.png
|
2021-02-09 12:48:52.699361 |
212 |
34619735 |
Repairing of pcc road Aiyub Mondal to from sk pukur at Khajurdihi SAN XVII |
172304 |
Repairing of pcc road Aiyub Mondal to from sk pukur at Khajurdihi SAN XVII 1 |
Completion of work |
-
latitude : 23.61582740675658,23.615828538313508
Longitude : 88.12215328216553,88.122154539451
file name : Image_29012021122952120.png
|
2021-01-29 12:29:52.243831 |
213 |
39072539 |
Soler water treatment plant at panuhat indrarpar v |
857107 |
Soler water treatment plant at panuhat indrarpar v1 |
Roof laid |
-
latitude : 23.630776
Longitude : 88.1425708
file name : Image_05102021140151231.png
|
2021-10-05 14:01:51.325099 |
214 |
39072539 |
Soler water treatment plant at panuhat indrarpar v |
857107 |
Soler water treatment plant at panuhat indrarpar v1 |
Plinth level |
-
latitude : 23.630816
Longitude : 88.1425659
file name : Image_05102021135937659.png
|
2021-10-05 13:59:37.789039 |
215 |
39072539 |
Soler water treatment plant at panuhat indrarpar v |
857107 |
Soler water treatment plant at panuhat indrarpar v1 |
Completion of work |
-
latitude : 23.6308384
Longitude : 88.1425786
file name : Image_05102021135651344.png
|
2021-10-05 13:56:51.471128 |
216 |
39073301 |
Community ToiletKhajurdihi Dakshin muslim paraSAN xvii |
349823 |
Community ToiletKhajurdihi Dakshin muslim paraSAN xvii1 |
Roof laid |
-
latitude : 23.613848
Longitude : 88.120323
file name : Image_02122021132319256.png
|
2021-12-02 13:23:19.381093 |
217 |
39073301 |
Community ToiletKhajurdihi Dakshin muslim paraSAN xvii |
349823 |
Community ToiletKhajurdihi Dakshin muslim paraSAN xvii1 |
Plinth level |
-
latitude : 23.6138482
Longitude : 88.1203229
file name : Image_02122021132001640.png
|
2021-12-02 13:20:01.727804 |
218 |
39073301 |
Community ToiletKhajurdihi Dakshin muslim paraSAN xvii |
349823 |
Community ToiletKhajurdihi Dakshin muslim paraSAN xvii1 |
Completion of work |
-
latitude : 23.613833100534976
Longitude : 88.1202532723546
file name : Image_18082021131525736.png
|
2021-08-18 13:15:25.863051 |
219 |
34566875 |
PCC road Ripan Skto Irfan Skat Panuhat DangaparaSAN II |
334345 |
PCC road Ripan Skto Irfan Skat Panuhat DangaparaSAN II1 |
Roof laid |
-
latitude : 23.628776567056775,23.628776567056775
Longitude : 88.12603879719973,88.12603879719973
file name : Image_05022021141201608.png
|
2021-02-05 14:12:01.685534 |
220 |
34566875 |
PCC road Ripan Skto Irfan Skat Panuhat DangaparaSAN II |
334345 |
PCC road Ripan Skto Irfan Skat Panuhat DangaparaSAN II1 |
Plinth level |
-
latitude : 23.6288726,23.6288726
Longitude : 88.1344558,88.1344558
file name : Image_05022021115044099.png
|
2021-02-05 11:50:44.224743 |
221 |
34566875 |
PCC road Ripan Skto Irfan Skat Panuhat DangaparaSAN II |
334345 |
PCC road Ripan Skto Irfan Skat Panuhat DangaparaSAN II1 |
Completion of work |
-
latitude : 23.62777539063245,23.627788089215755
Longitude : 88.1350611615926,88.13505202531815
file name : Image_31122020115259724.png
|
2020-12-31 11:52:59.820856 |
222 |
34565422 |
PCC road Mondalhat F P schoolto Mihir Debnathat MondalhatSAN vii |
187753 |
PCC road Mondalhat F P schoolto Mihir Debnathat MondalhatSAN vii1 |
Roof laid |
-
latitude : 23.628574437461793,23.628574437461793
Longitude : 88.14540375955403,88.14540375955403
file name : Image_31012021143357568.png
|
2021-01-31 14:33:57.652285 |
223 |
34565422 |
PCC road Mondalhat F P schoolto Mihir Debnathat MondalhatSAN vii |
187753 |
PCC road Mondalhat F P schoolto Mihir Debnathat MondalhatSAN vii1 |
Plinth level |
-
latitude : 23.62858973443508,23.62857053987682
Longitude : 88.14540082588792,88.14540426246822
file name : Image_31012021143222382.png
|
2021-01-31 14:32:22.465382 |
224 |
34565422 |
PCC road Mondalhat F P schoolto Mihir Debnathat MondalhatSAN vii |
187753 |
PCC road Mondalhat F P schoolto Mihir Debnathat MondalhatSAN vii1 |
Completion of work |
-
latitude : 23.628577622585,23.62855867948383
Longitude : 88.14541968517005,88.14541482366621
file name : Image_14012021102037591.png
|
2021-01-14 10:20:37.677686 |
225 |
34540837 |
PCC road Sukheranjan Debnath to Dinesh Debnath at Panuhat PASCHIMPARA san III |
63541 |
PCC road Sukheranjan Debnath to Dinesh Debnath at Panuhat PASCHIMPARA san III1 |
Roof laid |
-
latitude : 23.630104386247694,23.630104386247694
Longitude : 88.13911506906152,88.13911506906152
file name : Image_24072021125040954.png
|
2021-07-24 12:50:41.05725 |
226 |
34540837 |
PCC road Sukheranjan Debnath to Dinesh Debnath at Panuhat PASCHIMPARA san III |
63541 |
PCC road Sukheranjan Debnath to Dinesh Debnath at Panuhat PASCHIMPARA san III1 |
Completion of work |
-
latitude : 23.630214943550527,23.630165196955204
Longitude : 88.13913283869624,88.13915102742612
file name : Image_04022021113637700.png
|
2021-02-04 11:36:37.796467 |
227 |
34585529 |
Repairing PCC road Niru Denathto Bishnu Dasat Panuhat BoyaliaparaSAN v |
118999 |
Repairing PCC road Niru Denathto Bishnu Dasat Panuhat BoyaliaparaSAN v1 |
Roof laid |
-
latitude : 23.6294336,23.6294336
Longitude : 88.1401348,88.1401348
file name : Image_16072021091459140.png
|
2021-07-16 09:14:59.23074 |
228 |
34585529 |
Repairing PCC road Niru Denathto Bishnu Dasat Panuhat BoyaliaparaSAN v |
118999 |
Repairing PCC road Niru Denathto Bishnu Dasat Panuhat BoyaliaparaSAN v1 |
Plinth level |
-
latitude : 23.629697528667748,23.629697528667748
Longitude : 88.14011511392891,88.14011511392891
file name : Image_16072021091239160.png
|
2021-07-16 09:12:39.243531 |
229 |
34585529 |
Repairing PCC road Niru Denathto Bishnu Dasat Panuhat BoyaliaparaSAN v |
118999 |
Repairing PCC road Niru Denathto Bishnu Dasat Panuhat BoyaliaparaSAN v1 |
Completion of work |
-
latitude : 23.6294283,23.6294283
Longitude : 88.1401523,88.1401523
file name : Image_20062021100638587.png
|
2021-06-20 10:06:38.678672 |
230 |
34564637 |
PCC road Dinabandhu Das to Laxman Sarkar at Panuhat baidyapara SAN VI |
115905 |
PCC road Dinabandhu Das to Laxman Sarkar at Panuhat baidyapara SAN VI1 |
Completion of work |
-
latitude : 23.626619526185095,23.632710152305663,23.63272100687027
Longitude : 88.13939108513296,88.14601270481944,88.146022092551
file name : Image_04022021111411869.png
|
2021-02-04 11:14:11.965067 |
231 |
34616446 |
Rural water supply |
2000000 |
Rural water supply1 |
Completion of work |
-
latitude : 23.628714
Longitude : 88.1259557
file name : Image_22062021150045126.png
|
2021-06-22 15:00:45.227748 |
232 |
34553370 |
PCC road including pacca drain Jogendra Debnath to Subodh Debnath at Panuhat sanIV |
173664 |
PCC road including pacca drain Jogendra Debnath to Subodh Debnath at Panuhat sanIV 1 |
Roof laid |
-
latitude : 23.63065197598189,23.630654448643327
Longitude : 88.14154447987676,88.14154582098126
file name : Image_03022021133813592.png
|
2021-02-03 13:38:13.696372 |
233 |
34553370 |
PCC road including pacca drain Jogendra Debnath to Subodh Debnath at Panuhat sanIV |
173664 |
PCC road including pacca drain Jogendra Debnath to Subodh Debnath at Panuhat sanIV 1 |
Plinth level |
-
latitude : 23.6298263,23.630583621561527
Longitude : 88.1430215,88.1415438093245
file name : Image_03022021133622221.png
|
2021-02-03 13:36:22.316777 |
234 |
34553370 |
PCC road including pacca drain Jogendra Debnath to Subodh Debnath at Panuhat sanIV |
173664 |
PCC road including pacca drain Jogendra Debnath to Subodh Debnath at Panuhat sanIV 1 |
Completion of work |
-
latitude : 23.6299703,23.630687682889402
Longitude : 88.1429553,88.14150617457926
file name : Image_24012021105223814.png
|
2021-01-24 10:52:23.922286 |
235 |
34624123 |
Repairing PCC road from Anower Sk to Majhi para FP Schppl at KhajurdihiSAN xiv |
92235 |
Repairing PCC road from Anower Sk to Majhi para FP Schppl at KhajurdihiSAN xiv1 |
Roof laid |
-
latitude : 23.6187731847167,23.618773226626217
Longitude : 88.12269777059555,88.12269777059555
file name : Image_04022021141111874.png
|
2021-02-04 14:11:11.984281 |
236 |
34624123 |
Repairing PCC road from Anower Sk to Majhi para FP Schppl at KhajurdihiSAN xiv |
92235 |
Repairing PCC road from Anower Sk to Majhi para FP Schppl at KhajurdihiSAN xiv1 |
Plinth level |
-
latitude : 23.618757091462612,23.6187499249354
Longitude : 88.12269969843328,88.12270347028971
file name : Image_04022021135916108.png
|
2021-02-04 13:59:16.220285 |
237 |
34624123 |
Repairing PCC road from Anower Sk to Majhi para FP Schppl at KhajurdihiSAN xiv |
92235 |
Repairing PCC road from Anower Sk to Majhi para FP Schppl at KhajurdihiSAN xiv1 |
Completion of work |
-
latitude : 23.618245711550117,23.61823414452374
Longitude : 88.12293724156916,88.12294352799654
file name : Image_29122020134050730.png
|
2020-12-29 13:40:50.841161 |
238 |
34624123 |
Repairing PCC road from Anower Sk to Majhi para FP Schppl at KhajurdihiSAN xiv |
92235 |
Repairing PCC road from Anower Sk to Majhi para FP Schppl at KhajurdihiSAN xiv1 |
Completion of work |
-
latitude : 23.618245711550117,23.61823414452374
Longitude : 88.12293724156916,88.12294352799654
file name : Image_29122020134059166.png
|
2020-12-29 13:40:59.272501 |
239 |
34537369 |
Pucca Drain with Cover Rathin Debnathto Manik Debnathat PanuhatSAN v |
231316 |
Pucca Drain with Cover Rathin Debnathto Manik Debnathat PanuhatSAN v1 |
Roof laid |
-
latitude : 23.63038802985102,23.630377049557865
Longitude : 88.14153894782066,88.14154263585806
file name : Image_31012021142859173.png
|
2021-01-31 14:28:59.263609 |
240 |
34537369 |
Pucca Drain with Cover Rathin Debnathto Manik Debnathat PanuhatSAN v |
231316 |
Pucca Drain with Cover Rathin Debnathto Manik Debnathat PanuhatSAN v1 |
Plinth level |
-
latitude : 23.630403159186244,23.63040328491479
Longitude : 88.1415591482073,88.14155889675021
file name : Image_31012021142555459.png
|
2021-01-31 14:25:55.543994 |
241 |
34537369 |
Pucca Drain with Cover Rathin Debnathto Manik Debnathat PanuhatSAN v |
231316 |
Pucca Drain with Cover Rathin Debnathto Manik Debnathat PanuhatSAN v1 |
Completion of work |
-
latitude : 23.630364811979234,23.63034976646304
Longitude : 88.14161262474954,88.14161480404437
file name : Image_14012021101639011.png
|
2021-01-14 10:16:39.102556 |
242 |
34560109 |
pPucca Drain with Cover Moulanawaj Skto Bakultalaat EkaihatSAN xi |
296453 |
pPucca Drain with Cover Moulanawaj Skto Bakultalaat EkaihatSAN xi1 |
Roof laid |
-
latitude : 23.62443583086133,23.624440650455654
Longitude : 88.14678149297833,88.1467658188194
file name : Image_31012021145133471.png
|
2021-01-31 14:51:33.5655 |
243 |
34560109 |
pPucca Drain with Cover Moulanawaj Skto Bakultalaat EkaihatSAN xi |
296453 |
pPucca Drain with Cover Moulanawaj Skto Bakultalaat EkaihatSAN xi1 |
Plinth level |
-
latitude : 23.624446308240294,23.624438429251313
Longitude : 88.14679683186114,88.14677948132157
file name : Image_31012021144934373.png
|
2021-01-31 14:49:34.45895 |
244 |
34560109 |
pPucca Drain with Cover Moulanawaj Skto Bakultalaat EkaihatSAN xi |
296453 |
pPucca Drain with Cover Moulanawaj Skto Bakultalaat EkaihatSAN xi1 |
Completion of work |
-
latitude : 23.628726904280484,23.624482811428607
Longitude : 88.12603745609522,88.14676020294428
file name : Image_30122020123143127.png
|
2020-12-30 12:31:43.220681 |
245 |
34607803 |
PCC road Eyarul sk o Canal at Khajurdihi SAN xviii |
298514 |
PCC road Eyarul sk o Canal at Khajurdihi SAN xviii1 |
Roof laid |
-
latitude : 23.617552402429283,23.617552402429283
Longitude : 88.12916776165366,88.12916776165366
file name : Image_15022021125911702.png
|
2021-02-15 12:59:11.804476 |
246 |
34607803 |
PCC road Eyarul sk o Canal at Khajurdihi SAN xviii |
298514 |
PCC road Eyarul sk o Canal at Khajurdihi SAN xviii1 |
Plinth level |
-
latitude : 23.61751874908805,23.61751874908805
Longitude : 88.1291776522994,88.1291776522994
file name : Image_15022021125732827.png
|
2021-02-15 12:57:32.9258 |
247 |
34607803 |
PCC road Eyarul sk o Canal at Khajurdihi SAN xviii |
298514 |
PCC road Eyarul sk o Canal at Khajurdihi SAN xviii1 |
Completion of work |
-
latitude : 23.617526167072356,23.617523778229952
Longitude : 88.12915300950408,88.12912710942328
file name : Image_27012021155046252.png
|
2021-01-27 15:50:46.356388 |
248 |
34571905 |
PCC road Dubo Ghosh to Dilip Sardar at mondalhat SAN VIII |
134191 |
PCC road Dubo Ghosh to Dilip Sardar at mondalhat SAN VIII 1 |
Roof laid |
-
latitude : 23.6277486,23.6277486
Longitude : 88.1440208,88.1440208
file name : Image_16072021092018014.png
|
2021-07-16 09:20:18.124588 |
249 |
34571905 |
PCC road Dubo Ghosh to Dilip Sardar at mondalhat SAN VIII |
134191 |
PCC road Dubo Ghosh to Dilip Sardar at mondalhat SAN VIII 1 |
Plinth level |
-
latitude : 23.6277484,23.6277484
Longitude : 88.1440185,88.1440185
file name : Image_16072021091857266.png
|
2021-07-16 09:18:57.352536 |
250 |
34571905 |
PCC road Dubo Ghosh to Dilip Sardar at mondalhat SAN VIII |
134191 |
PCC road Dubo Ghosh to Dilip Sardar at mondalhat SAN VIII 1 |
Completion of work |
-
latitude : 23.627611314877868,23.627611314877868
Longitude : 88.14377155154943,88.14377155154943
file name : Image_20062021093917604.png
|
2021-06-20 09:39:17.732725 |
251 |
34583312 |
PPCC road Madhab Hazrato Prasanta Ghoshat MondalhatSAN viii |
181089 |
PPCC road Madhab Hazrato Prasanta Ghoshat MondalhatSAN viii1 |
Roof laid |
-
latitude : 23.62619473133236,23.62619142048061
Longitude : 88.14197019673884,88.14197422005236
file name : Image_31012021151414603.png
|
2021-01-31 15:14:14.695832 |
252 |
34583312 |
PPCC road Madhab Hazrato Prasanta Ghoshat MondalhatSAN viii |
181089 |
PPCC road Madhab Hazrato Prasanta Ghoshat MondalhatSAN viii1 |
Plinth level |
-
latitude : 23.62618211656809,23.62617331556976
Longitude : 88.1421640701592,88.14217873848975
file name : Image_31012021151116091.png
|
2021-01-31 15:11:16.170951 |
253 |
34583312 |
PPCC road Madhab Hazrato Prasanta Ghoshat MondalhatSAN viii |
181089 |
PPCC road Madhab Hazrato Prasanta Ghoshat MondalhatSAN viii1 |
Completion of work |
-
latitude : 23.62615609075874,23.626156258396804
Longitude : 88.14220271073282,88.14220220781863
file name : Image_14012021095834151.png
|
2021-01-14 09:58:34.285393 |
254 |
34624455 |
Repairing of pcc road Rathin Narayan Ghoshal to Harihar Saha main road SAN XV |
154029 |
Repairing of pcc road Rathin Narayan Ghoshal to Harihar Saha main road SAN XV 1 |
Roof laid |
-
latitude : 23.618883909657598,23.618883909657598
Longitude : 88.12195857055485,88.12195857055485
file name : Image_08022021121839580.png
|
2021-02-08 12:18:39.679695 |
255 |
34624455 |
Repairing of pcc road Rathin Narayan Ghoshal to Harihar Saha main road SAN XV |
154029 |
Repairing of pcc road Rathin Narayan Ghoshal to Harihar Saha main road SAN XV 1 |
Plinth level |
-
latitude : 23.62871592398733,23.62871592398733
Longitude : 88.1259776931256,88.1259776931256
file name : Image_08022021121618960.png
|
2021-02-08 12:16:19.045085 |
256 |
34624455 |
Repairing of pcc road Rathin Narayan Ghoshal to Harihar Saha main road SAN XV |
154029 |
Repairing of pcc road Rathin Narayan Ghoshal to Harihar Saha main road SAN XV 1 |
Completion of work |
-
latitude : 23.61893893685192,23.61893172841519
Longitude : 88.12147300690413,88.1214848253876
file name : Image_29012021122515391.png
|
2021-01-29 12:25:15.484086 |
257 |
34578031 |
PCC road Moulanawaj sk to the land of Bakultala at Ekaihat SAN XI |
271293 |
PCC road Moulanawaj sk to the land of Bakultala at Ekaihat SAN XI 1 |
Roof laid |
-
latitude : 23.624382647685707,23.624383863061666
Longitude : 88.14665886573493,88.14666029065847
file name : Image_31012021144135626.png
|
2021-01-31 14:41:35.712075 |
258 |
34578031 |
PCC road Moulanawaj sk to the land of Bakultala at Ekaihat SAN XI |
271293 |
PCC road Moulanawaj sk to the land of Bakultala at Ekaihat SAN XI 1 |
Plinth level |
-
latitude : 23.624431095086038,23.624415211379528
Longitude : 88.14672608859837,88.14670915715396
file name : Image_31012021143852030.png
|
2021-01-31 14:38:52.118686 |
259 |
34578031 |
PCC road Moulanawaj sk to the land of Bakultala at Ekaihat SAN XI |
271293 |
PCC road Moulanawaj sk to the land of Bakultala at Ekaihat SAN XI 1 |
Completion of work |
-
latitude : 23.624421497806907,23.624421497806907
Longitude : 88.146767411381,88.146767411381
file name : Image_14012021102532540.png
|
2021-01-14 10:25:32.635504 |
260 |
58905547 |
CONST OF PCC ROAD FROM KHOKAN PRODHAN TO KATAL GORE PUKUR PAR AT KHAJURDIHI PRODHAN PARA SAN XIII |
98315 |
CONST OF PCC ROAD FROM KHOKAN PRODHAN TO KATAL GORE PUKUR PAR AT KHAJURDIHI PRODHAN PARA SAN XIII1 |
Roof laid |
-
latitude : 23.6172891,23.6172891
Longitude : 88.118436,88.118436
file name : Image_12052023134715808.png
|
2023-05-12 13:47:15.921968 |
261 |
58905547 |
CONST OF PCC ROAD FROM KHOKAN PRODHAN TO KATAL GORE PUKUR PAR AT KHAJURDIHI PRODHAN PARA SAN XIII |
98315 |
CONST OF PCC ROAD FROM KHOKAN PRODHAN TO KATAL GORE PUKUR PAR AT KHAJURDIHI PRODHAN PARA SAN XIII1 |
Plinth level |
-
latitude : 23.6172886,23.6172886
Longitude : 88.1184077,88.1184077
file name : Image_12052023134548620.png
|
2023-05-12 13:45:48.707494 |
262 |
58905547 |
CONST OF PCC ROAD FROM KHOKAN PRODHAN TO KATAL GORE PUKUR PAR AT KHAJURDIHI PRODHAN PARA SAN XIII |
98315 |
CONST OF PCC ROAD FROM KHOKAN PRODHAN TO KATAL GORE PUKUR PAR AT KHAJURDIHI PRODHAN PARA SAN XIII1 |
Completion of work |
-
latitude : 23.6186873,23.6186873
Longitude : 88.1181408,88.1181408
file name : Image_12052023134332586.png
|
2023-05-12 13:43:32.694908 |
263 |
66448087 |
Creation of Shed for segregation and processing of wet and dry waste |
102035 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 23.6159163
Longitude : 88.1323511
file name : Image_17052023125240832.png
|
2023-05-17 12:52:40.940101 |
264 |
66448087 |
Creation of Shed for segregation and processing of wet and dry waste |
102035 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 23.6286751
Longitude : 88.1259733
file name : Image_17052023124338190.png
|
2023-05-17 12:43:38.354121 |
265 |
66453551 |
Any other operation and maintenance needs related to solid waste management |
152258 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 23.615297838114202
Longitude : 88.1327003147453
file name : Image_17052023130341534.png
|
2023-05-17 13:03:41.656805 |
266 |
66453551 |
Any other operation and maintenance needs related to solid waste management |
152258 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 23.6159163
Longitude : 88.1323511
file name : Image_17052023125333104.png
|
2023-05-17 12:53:33.237491 |
267 |
66453551 |
Any other operation and maintenance needs related to solid waste management |
152258 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 23.6154809826985
Longitude : 88.13283660449088
file name : Image_17052023124533238.png
|
2023-05-17 12:45:33.348341 |
268 |
66448122 |
Any other operation and maintenance needs related to solid waste management |
772685 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 23.615479138679802
Longitude : 88.13271028921008
file name : Image_17052023130147434.png
|
2023-05-17 13:01:47.601932 |
269 |
66448122 |
Any other operation and maintenance needs related to solid waste management |
772685 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 23.6159163
Longitude : 88.1323511
file name : Image_17052023125307968.png
|
2023-05-17 12:53:08.076339 |
270 |
66448122 |
Any other operation and maintenance needs related to solid waste management |
772685 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 23.615428302437067
Longitude : 88.1327679567039
file name : Image_17052023124406200.png
|
2023-05-17 12:44:06.331839 |
271 |
66453582 |
Creation of a new source of drinking water |
207529 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.615077226422727
Longitude : 88.13273753039539
file name : Image_17052023130526203.png
|
2023-05-17 13:05:26.312893 |
272 |
66453582 |
Creation of a new source of drinking water |
207529 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.615403911098838
Longitude : 88.13281372189522
file name : Image_17052023125520929.png
|
2023-05-17 12:55:21.069395 |
273 |
66453582 |
Creation of a new source of drinking water |
207529 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.615421261638403
Longitude : 88.13277684152126
file name : Image_17052023124436750.png
|
2023-05-17 12:44:36.902153 |
274 |
66453520 |
Any other operation and maintenance needs related to solid waste management |
568822 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 23.615359612740576
Longitude : 88.13271607272327
file name : Image_17052023130303248.png
|
2023-05-17 13:03:03.422994 |
275 |
66453520 |
Any other operation and maintenance needs related to solid waste management |
568822 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 23.615474528633058
Longitude : 88.13273803330958
file name : Image_17052023130232080.png
|
2023-05-17 13:02:32.169163 |
276 |
66453520 |
Any other operation and maintenance needs related to solid waste management |
568822 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 23.6159163
Longitude : 88.1323511
file name : Image_17052023125613196.png
|
2023-05-17 12:56:13.298892 |
277 |
66453520 |
Any other operation and maintenance needs related to solid waste management |
568822 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 23.61538132186979
Longitude : 88.13276996836066
file name : Image_17052023124508158.png
|
2023-05-17 12:45:08.304974 |
278 |
66453571 |
Any other operation and maintenance needs related to solid waste management |
171386 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 23.615287402644753
Longitude : 88.132678354159
file name : Image_17052023130430728.png
|
2023-05-17 13:04:30.823579 |
279 |
66453571 |
Any other operation and maintenance needs related to solid waste management |
171386 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 23.61543898936361
Longitude : 88.13272973522544
file name : Image_17052023125448406.png
|
2023-05-17 12:54:48.512234 |
280 |
66453571 |
Any other operation and maintenance needs related to solid waste management |
171386 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 23.6159163
Longitude : 88.1323511
file name : Image_17052023125402332.png
|
2023-05-17 12:54:02.443046 |
281 |
66453571 |
Any other operation and maintenance needs related to solid waste management |
171386 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 23.61547054722905
Longitude : 88.1328160688281
file name : Image_17052023124602082.png
|
2023-05-17 12:46:02.186543 |
282 |
57674875 |
INSTALLATION OF MARK II TUBEWELL AT PANCHGHARA SATHI SANGHA CLUB |
99425 |
INSTALLATION OF MARK II TUBEWELL AT PANCHGHARA SATHI SANGHA CLUB1 |
Roof laid |
-
latitude : 23.6282338
Longitude : 88.1204556
file name : Image_05062023150436838.png
|
2023-06-05 15:04:36.93891 |
283 |
57674875 |
INSTALLATION OF MARK II TUBEWELL AT PANCHGHARA SATHI SANGHA CLUB |
99425 |
INSTALLATION OF MARK II TUBEWELL AT PANCHGHARA SATHI SANGHA CLUB1 |
Plinth level |
-
latitude : 23.62920823507011
Longitude : 88.11980668455362
file name : Image_05062023150339102.png
|
2023-06-05 15:03:39.208454 |
284 |
57674875 |
INSTALLATION OF MARK II TUBEWELL AT PANCHGHARA SATHI SANGHA CLUB |
99425 |
INSTALLATION OF MARK II TUBEWELL AT PANCHGHARA SATHI SANGHA CLUB1 |
Completion of work |
-
latitude : 23.6355354
Longitude : 88.128338
file name : Image_05062023144024057.png
|
2023-06-05 14:40:24.157227 |
285 |
58934511 |
UPGRATATION OF PUKUR GHAT BEIDE WEST SIDE OF PUKUR GHAT AT PANCHGHARA SAN I |
126524 |
UPGRATATION OF PUKUR GHAT BEIDE WEST SIDE OF PUKUR GHAT AT PANCHGHARA SAN I1 |
Completion of work |
-
latitude : 23.6284087,23.6284087
Longitude : 88.1432336,88.1432336
file name : Image_19062023230421947.png
|
2023-06-19 23:04:22.690662 |
286 |
58907372 |
EXTENTION OF GP BUILDING |
1163077 |
EXTENTION OF GP BUILDING1 |
Completion of work |
-
latitude : 23.6286178
Longitude : 88.1259477
file name : Image_09082023122031409.png
|
2023-08-09 12:20:31.517166 |
287 |
57660980 |
CONST PF PUCCA DRAIN WITH SOAKPIT FROM BHARALI GORE TO K K ROAD(INCLUDING ONE CULVERT) AT KHAJURDIHI |
161067 |
CONST PF PUCCA DRAIN WITH SOAKPIT FROM BHARALI GORE TO K K ROAD(INCLUDING ONE CULVERT) AT KHAJURDIHI1 |
Roof laid |
-
latitude : 23.6286869,23.6286869
Longitude : 88.1259421,88.1259421
file name : Image_28112023151545774.png
|
2023-11-28 15:15:45.861739 |
288 |
57660980 |
CONST PF PUCCA DRAIN WITH SOAKPIT FROM BHARALI GORE TO K K ROAD(INCLUDING ONE CULVERT) AT KHAJURDIHI |
161067 |
CONST PF PUCCA DRAIN WITH SOAKPIT FROM BHARALI GORE TO K K ROAD(INCLUDING ONE CULVERT) AT KHAJURDIHI1 |
Plinth level |
-
latitude : 23.6286843,23.6286843
Longitude : 88.1259474,88.1259474
file name : Image_28112023151113953.png
|
2023-11-28 15:11:14.065559 |
289 |
57660980 |
CONST PF PUCCA DRAIN WITH SOAKPIT FROM BHARALI GORE TO K K ROAD(INCLUDING ONE CULVERT) AT KHAJURDIHI |
161067 |
CONST PF PUCCA DRAIN WITH SOAKPIT FROM BHARALI GORE TO K K ROAD(INCLUDING ONE CULVERT) AT KHAJURDIHI1 |
Completion of work |
-
latitude : 23.620967734605074,23.62096442375332
Longitude : 88.11969260685146,88.11969964765012
file name : Image_04112023125743854.png
|
2023-11-04 12:57:43.96868 |
290 |
69462597 |
Construction of roads |
90852 |
Construction of roads1 |
Roof laid |
-
latitude : 23.620045599527657,23.620045599527657
Longitude : 88.11767927370965,88.11767927370965
file name : Image_28112023154345228.png
|
2023-11-28 15:43:45.329507 |
291 |
69462597 |
Construction of roads |
90852 |
Construction of roads1 |
Plinth level |
-
latitude : 23.6184053,23.6184053
Longitude : 88.1185485,88.1185485
file name : Image_28112023154107476.png
|
2023-11-28 15:41:07.567394 |
292 |
69462597 |
Construction of roads |
90852 |
Construction of roads1 |
Completion of work |
-
latitude : 23.619958427734673,23.619958427734673
Longitude : 88.11766561120749,88.11766561120749
file name : Image_04112023131439091.png
|
2023-11-04 13:14:39.181541 |
293 |
69704682 |
Creation of drainage channel for management of grey water |
227126 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.628415
Longitude : 88.143251
file name : Image_24112023113610541.png
|
2023-11-24 11:36:10.638687 |
294 |
69704682 |
Creation of drainage channel for management of grey water |
227126 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.628415
Longitude : 88.143251
file name : Image_24112023113410720.png
|
2023-11-24 11:34:10.817575 |
295 |
69704682 |
Creation of drainage channel for management of grey water |
227126 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.628415
Longitude : 88.143251
file name : Image_24112023112959308.png
|
2023-11-24 11:29:59.407725 |
296 |
69463586 |
Construction of roads |
300000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6286869,23.6286869
Longitude : 88.1259421,88.1259421
file name : Image_28112023152145992.png
|
2023-11-28 15:21:46.077611 |
297 |
69463586 |
Construction of roads |
300000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.6286869,23.6286869
Longitude : 88.1259421,88.1259421
file name : Image_28112023151917060.png
|
2023-11-28 15:19:17.156473 |
298 |
69463586 |
Construction of roads |
300000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.61990252044052,23.61990252044052
Longitude : 88.11921819113195,88.11921819113195
file name : Image_04112023130058731.png
|
2023-11-04 13:00:58.830397 |
299 |
69704782 |
Creation of drainage channel for management of grey water |
225430 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.6286777
Longitude : 88.1259827
file name : Image_29122023122815943.png
|
2023-12-29 12:28:16.028355 |
300 |
69704782 |
Creation of drainage channel for management of grey water |
225430 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.6286784
Longitude : 88.1259841
file name : Image_29122023122033411.png
|
2023-12-29 12:20:33.518355 |
301 |
69704782 |
Creation of drainage channel for management of grey water |
225430 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.6348021
Longitude : 88.145249
file name : Image_09112023123247876.png
|
2023-11-09 12:32:48.071855 |
302 |
69704174 |
Creation of drainage channel for management of grey water |
225430 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.6286752
Longitude : 88.125986
file name : Image_29122023122420775.png
|
2023-12-29 12:24:20.866321 |
303 |
69704174 |
Creation of drainage channel for management of grey water |
225430 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.6286791
Longitude : 88.1259818
file name : Image_29122023121811615.png
|
2023-12-29 12:18:11.702276 |
304 |
69704174 |
Creation of drainage channel for management of grey water |
225430 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.6284024
Longitude : 88.1432359
file name : Image_09112023115140586.png
|
2023-11-09 11:51:40.692232 |
305 |
69461230 |
Construction of roads |
126423 |
Construction of roads1 |
Roof laid |
-
latitude : 23.63145823124796,23.63145823124796
Longitude : 88.14082849770784,88.14082849770784
file name : Image_05122023113052811.png
|
2023-12-05 11:30:52.899899 |
306 |
69461230 |
Construction of roads |
126423 |
Construction of roads1 |
Plinth level |
-
latitude : 23.63161639776081,23.63161639776081
Longitude : 88.14066270366311,88.14066270366311
file name : Image_05122023112642664.png
|
2023-12-05 11:26:42.763309 |
307 |
69461230 |
Construction of roads |
126423 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6317345,23.6317345
Longitude : 88.1405271,88.1405271
file name : Image_09112023124225305.png
|
2023-11-09 12:42:25.52323 |
308 |
69706262 |
Creation of drainage channel for management of grey water |
262930 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.61910079140216
Longitude : 88.12420441769063
file name : Image_05122023165136852.png
|
2023-12-05 16:51:36.947921 |
309 |
69706262 |
Creation of drainage channel for management of grey water |
262930 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.619016553275287
Longitude : 88.12423652037978
file name : Image_05122023164603306.png
|
2023-12-05 16:46:03.397953 |
310 |
69706262 |
Creation of drainage channel for management of grey water |
262930 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.619062276557088
Longitude : 88.1242616660893
file name : Image_04112023133945954.png
|
2023-11-04 13:39:46.056107 |
311 |
69459962 |
Construction of roads |
237359 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6286808,23.6286808
Longitude : 88.1259651,88.1259651
file name : Image_13122023163827315.png
|
2023-12-13 16:38:27.439299 |
312 |
69459962 |
Construction of roads |
237359 |
Construction of roads1 |
Plinth level |
-
latitude : 23.6286781,23.6286781
Longitude : 88.1259659,88.1259659
file name : Image_13122023163600876.png
|
2023-12-13 16:36:00.994649 |
313 |
69459962 |
Construction of roads |
237359 |
Construction of roads1 |
Completion of work |
-
latitude : 23.628678,23.628678
Longitude : 88.1259668,88.1259668
file name : Image_13122023163432119.png
|
2023-12-13 16:34:32.981295 |
314 |
69460466 |
Construction of roads |
148164 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6284045,23.6284045
Longitude : 88.143256,88.143256
file name : Image_30112023175319050.png
|
2023-11-30 17:53:19.169878 |
315 |
69460466 |
Construction of roads |
148164 |
Construction of roads1 |
Plinth level |
-
latitude : 23.628404,23.628404
Longitude : 88.1432545,88.1432545
file name : Image_30112023174542580.png
|
2023-11-30 17:45:43.290817 |
316 |
69460466 |
Construction of roads |
148164 |
Construction of roads1 |
Completion of work |
-
latitude : 23.62740298267454,23.62740298267454
Longitude : 88.13655875623226,88.13655875623226
file name : Image_30112023171315144.png
|
2023-11-30 17:13:15.471461 |
317 |
89598017 |
Construction of roads |
145515 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6287974,23.6287974
Longitude : 88.1259645,88.1259645
file name : Image_20092024170226813.png
|
2024-09-20 17:02:26.900425 |
318 |
89598017 |
Construction of roads |
145515 |
Construction of roads1 |
Plinth level |
-
latitude : 23.621717705391347,23.621717705391347
Longitude : 88.14457705244422,88.14457705244422
file name : Image_12092024085102730.png
|
2024-09-12 08:51:02.816992 |
319 |
89598017 |
Construction of roads |
145515 |
Construction of roads1 |
Completion of work |
-
latitude : 23.62168882973492,23.62168882973492
Longitude : 88.14450262114406,88.14450262114406
file name : Image_12092024084730281.png
|
2024-09-12 08:47:30.351915 |
320 |
69705320 |
Creation of drainage channel for management of grey water |
248362 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.6154397
Longitude : 88.1189419
file name : Image_28112023153612246.png
|
2023-11-28 15:36:12.327917 |
321 |
69705320 |
Creation of drainage channel for management of grey water |
248362 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.6160329
Longitude : 88.1197622
file name : Image_28112023153408024.png
|
2023-11-28 15:34:08.119324 |
322 |
69705320 |
Creation of drainage channel for management of grey water |
248362 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.6161044
Longitude : 88.1203008
file name : Image_04112023130819275.png
|
2023-11-04 13:08:19.368866 |
323 |
89598356 |
Construction of roads |
55492 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6288138,23.6288138
Longitude : 88.1259533,88.1259533
file name : Image_25092024180216498.png
|
2024-09-25 18:02:16.616104 |
324 |
89598356 |
Construction of roads |
55492 |
Construction of roads1 |
Plinth level |
-
latitude : 23.628784,23.628784
Longitude : 88.1259468,88.1259468
file name : Image_25092024175820867.png
|
2024-09-25 17:58:21.010312 |
325 |
89598356 |
Construction of roads |
55492 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6287887,23.6287887
Longitude : 88.1259528,88.1259528
file name : Image_25092024175511935.png
|
2024-09-25 17:55:12.03092 |
326 |
69463102 |
Construction of roads |
77508 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6170513,23.6170513
Longitude : 88.1192772,88.1192772
file name : Image_28112023152906162.png
|
2023-11-28 15:29:06.260231 |
327 |
69463102 |
Construction of roads |
77508 |
Construction of roads1 |
Plinth level |
-
latitude : 23.6170529,23.6170529
Longitude : 88.1193073,88.1193073
file name : Image_28112023152431572.png
|
2023-11-28 15:24:31.670378 |
328 |
69463102 |
Construction of roads |
77508 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6170319,23.6170319
Longitude : 88.1197533,88.1197533
file name : Image_04112023130501293.png
|
2023-11-04 13:05:01.379892 |
329 |
89598310 |
Construction of roads |
150650 |
Construction of roads1 |
Roof laid |
-
latitude : 23.61574048642069,23.61574048642069
Longitude : 88.12186578288674,88.12186578288674
file name : Image_13092024154028717.png
|
2024-09-13 15:40:28.799441 |
330 |
89598310 |
Construction of roads |
150650 |
Construction of roads1 |
Plinth level |
-
latitude : 23.615105263888836,23.615103042684495
Longitude : 88.12212025746703,88.12209988944232
file name : Image_13092024153416052.png
|
2024-09-13 15:34:16.151332 |
331 |
89598310 |
Construction of roads |
150650 |
Construction of roads1 |
Completion of work |
-
latitude : 23.61510664690286,23.61510664690286
Longitude : 88.12219452112913,88.12219452112913
file name : Image_13092024152948393.png
|
2024-09-13 15:29:48.473662 |
332 |
69705234 |
Creation of drainage channel for management of grey water |
239997 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.628402
Longitude : 88.1432315
file name : Image_04012024213222166.png
|
2024-01-04 21:32:22.260635 |
333 |
69705234 |
Creation of drainage channel for management of grey water |
239997 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.628402
Longitude : 88.1432315
file name : Image_04012024213037421.png
|
2024-01-04 21:30:37.506555 |
334 |
69705234 |
Creation of drainage channel for management of grey water |
239997 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.628402
Longitude : 88.1432315
file name : Image_04012024212830492.png
|
2024-01-04 21:28:30.572724 |
335 |
69464394 |
Construction of roads |
99461 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6286642,23.6286642
Longitude : 88.1260118,88.1260118
file name : Image_04012024152728258.png
|
2024-01-04 15:27:29.066275 |
336 |
69464394 |
Construction of roads |
99461 |
Construction of roads1 |
Plinth level |
-
latitude : 23.6286678,23.6286678
Longitude : 88.1260163,88.1260163
file name : Image_04012024152552853.png
|
2024-01-04 15:25:52.941567 |
337 |
69464394 |
Construction of roads |
99461 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6286652,23.6286652
Longitude : 88.1260114,88.1260114
file name : Image_04012024152329137.png
|
2024-01-04 15:23:29.227829 |
338 |
69462742 |
Construction of roads |
100321 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6287853,23.6287853
Longitude : 88.1259668,88.1259668
file name : Image_29082024123402986.png
|
2024-08-29 12:34:03.540691 |
339 |
69462742 |
Construction of roads |
100321 |
Construction of roads1 |
Plinth level |
-
latitude : 23.6287752,23.6287752
Longitude : 88.1259666,88.1259666
file name : Image_29082024123113257.png
|
2024-08-29 12:31:13.770292 |
340 |
69462742 |
Construction of roads |
100321 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6287968,23.6287968
Longitude : 88.1259723,88.1259723
file name : Image_21082024141221011.png
|
2024-08-21 14:12:21.13176 |
341 |
69460613 |
Construction of roads |
148164 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6287934,23.6287934
Longitude : 88.1259822,88.1259822
file name : Image_20062024123329216.png
|
2024-06-20 12:33:29.363865 |
342 |
69460613 |
Construction of roads |
148164 |
Construction of roads1 |
Plinth level |
-
latitude : 23.6287886,23.6287886
Longitude : 88.1259858,88.1259858
file name : Image_20062024122904010.png
|
2024-06-20 12:29:04.143626 |
343 |
69460613 |
Construction of roads |
148164 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6287828,23.6287828
Longitude : 88.1259805,88.1259805
file name : Image_20062024122702238.png
|
2024-06-20 12:27:02.489129 |
344 |
69436793 |
Installation of Computer with Internet facility |
50000 |
Installation of Computer with Internet facility1 |
|
-
latitude : 23.6284086
Longitude : 88.1432495
file name : Image_12122023234254356.png
|
2023-12-12 23:42:55.047426 |
345 |
69706650 |
Construction of Community Sanitary Complex |
349583 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.6284303
Longitude : 88.143228
file name : Image_27042024114417657.png
|
2024-04-27 11:44:17.80077 |
346 |
69706650 |
Construction of Community Sanitary Complex |
349583 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.6284274
Longitude : 88.1432274
file name : Image_27042024114107246.png
|
2024-04-27 11:41:07.39048 |
347 |
69706650 |
Construction of Community Sanitary Complex |
349583 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.6284267
Longitude : 88.1432331
file name : Image_27042024113933063.png
|
2024-04-27 11:39:33.1997 |
348 |
69705120 |
Creation of drainage channel for management of grey water |
247895 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.6286796
Longitude : 88.1259667
file name : Image_13122023163319435.png
|
2023-12-13 16:33:20.169025 |
349 |
69705120 |
Creation of drainage channel for management of grey water |
247895 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.6286729
Longitude : 88.1259664
file name : Image_13122023163055504.png
|
2023-12-13 16:30:55.610695 |
350 |
69705120 |
Creation of drainage channel for management of grey water |
247895 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.623088
Longitude : 88.1481595
file name : Image_09112023120206629.png
|
2023-11-09 12:02:06.732668 |
351 |
88466163 |
Creation of Shed for segregation and processing of wet and dry waste |
346048 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 23.6283995
Longitude : 88.1432353
file name : Image_02012024184349195.png
|
2024-01-02 18:43:49.274198 |
352 |
88466163 |
Creation of Shed for segregation and processing of wet and dry waste |
346048 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 23.6283989
Longitude : 88.1432348
file name : Image_02012024184001163.png
|
2024-01-02 18:40:01.921181 |
353 |
88466163 |
Creation of Shed for segregation and processing of wet and dry waste |
346048 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 23.6283996
Longitude : 88.143236
file name : Image_02012024183838389.png
|
2024-01-02 18:38:39.15957 |
354 |
88466223 |
Operation & maintenance of community compost pits |
92480 |
Operation & maintenance of community compost pits1 |
Roof laid |
-
latitude : 23.6284145
Longitude : 88.1432419
file name : Image_22122023234629039.png
|
2023-12-22 23:46:27.168957 |
355 |
88466223 |
Operation & maintenance of community compost pits |
92480 |
Operation & maintenance of community compost pits1 |
Plinth level |
-
latitude : 23.628415
Longitude : 88.1432427
file name : Image_22122023234302201.png
|
2023-12-22 23:43:00.480057 |
356 |
88466223 |
Operation & maintenance of community compost pits |
92480 |
Operation & maintenance of community compost pits1 |
Completion of work |
-
latitude : 23.6284135
Longitude : 88.1432374
file name : Image_22122023234008852.png
|
2023-12-22 23:40:09.6516 |
357 |
88466282 |
Operation & maintenance of composting shed/center |
98144 |
Operation & maintenance of composting shed/center1 |
Roof laid |
-
latitude : 23.6284048
Longitude : 88.1432331
file name : Image_22122023234636561.png
|
2023-12-22 23:46:37.317667 |
358 |
88466282 |
Operation & maintenance of composting shed/center |
98144 |
Operation & maintenance of composting shed/center1 |
Roof laid |
-
latitude : 23.6284048
Longitude : 88.1432331
file name : Image_22122023234633192.png
|
2023-12-22 23:46:33.942025 |
359 |
88466282 |
Operation & maintenance of composting shed/center |
98144 |
Operation & maintenance of composting shed/center1 |
Plinth level |
-
latitude : 23.6284171
Longitude : 88.1432382
file name : Image_22122023234329480.png
|
2023-12-22 23:43:27.529561 |
360 |
88466282 |
Operation & maintenance of composting shed/center |
98144 |
Operation & maintenance of composting shed/center1 |
Completion of work |
-
latitude : 23.6284146
Longitude : 88.1432425
file name : Image_22122023233946023.png
|
2023-12-22 23:39:46.678759 |
361 |
69437235 |
Repairing of Hall |
349943 |
Repairing of Hall1 |
Roof laid |
-
latitude : 23.6286867
Longitude : 88.1259816
file name : Image_30042024131609386.png
|
2024-04-30 13:16:09.475465 |
362 |
69437235 |
Repairing of Hall |
349943 |
Repairing of Hall1 |
Plinth level |
-
latitude : 23.6287639
Longitude : 88.1260154
file name : Image_30042024130213381.png
|
2024-04-30 13:02:13.467467 |
363 |
69437235 |
Repairing of Hall |
349943 |
Repairing of Hall1 |
Completion of work |
-
latitude : 23.6287726
Longitude : 88.1260147
file name : Image_30042024125726595.png
|
2024-04-30 12:57:27.284552 |
364 |
69460296 |
Construction of roads |
83404 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6284164,23.6284164
Longitude : 88.1432387,88.1432387
file name : Image_22122023233713852.png
|
2023-12-22 23:37:13.788994 |
365 |
69460296 |
Construction of roads |
83404 |
Construction of roads1 |
Plinth level |
-
latitude : 23.6284163,23.6284163
Longitude : 88.1432364,88.1432364
file name : Image_22122023233447827.png
|
2023-12-22 23:34:47.089412 |
366 |
69460296 |
Construction of roads |
83404 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6284155,23.6284155
Longitude : 88.1432405,88.1432405
file name : Image_22122023233235639.png
|
2023-12-22 23:32:34.541005 |
367 |
69463828 |
Repairing and maintenance of roads |
167669 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 23.6287863,23.6287863
Longitude : 88.1259857,88.1259857
file name : Image_20062024122050343.png
|
2024-06-20 12:20:50.460381 |
368 |
69463828 |
Repairing and maintenance of roads |
167669 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 23.6287847,23.6287851
Longitude : 88.1259832,88.1259886
file name : Image_20062024121820601.png
|
2024-06-20 12:18:20.703079 |
369 |
69463828 |
Repairing and maintenance of roads |
167669 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 23.6287951,23.6287951
Longitude : 88.1259828,88.1259828
file name : Image_20062024121319284.png
|
2024-06-20 12:13:19.393776 |
370 |
69703692 |
Creation of a new source of drinking water |
782653 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.6287902
Longitude : 88.1259693
file name : Image_24072024134141263.png
|
2024-07-24 13:41:40.517234 |
371 |
69703692 |
Creation of a new source of drinking water |
782653 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.62879
Longitude : 88.1259675
file name : Image_24072024133856363.png
|
2024-07-24 13:38:56.474139 |
372 |
69703692 |
Creation of a new source of drinking water |
782653 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.6287831
Longitude : 88.1259683
file name : Image_24072024133654422.png
|
2024-07-24 13:36:54.53384 |
373 |
69703784 |
Creation of a new source of drinking water |
782653 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.6287901
Longitude : 88.1259812
file name : Image_20062024120931507.png
|
2024-06-20 12:09:31.623836 |
374 |
69703784 |
Creation of a new source of drinking water |
782653 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.6287942
Longitude : 88.1259865
file name : Image_20062024120436397.png
|
2024-06-20 12:04:36.512354 |
375 |
69703784 |
Creation of a new source of drinking water |
782653 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.6287826
Longitude : 88.1259936
file name : Image_20062024112153308.png
|
2024-06-20 11:21:53.461389 |
376 |
69705640 |
Creation of drainage channel for management of grey water |
163483 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.6287807
Longitude : 88.1259686
file name : Image_22052024150044957.png
|
2024-05-22 15:00:45.049512 |
377 |
69705640 |
Creation of drainage channel for management of grey water |
163483 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.628771
Longitude : 88.1259742
file name : Image_22052024145925618.png
|
2024-05-22 14:59:25.710122 |
378 |
69705640 |
Creation of drainage channel for management of grey water |
163483 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.6287756
Longitude : 88.1259737
file name : Image_22052024145758431.png
|
2024-05-22 14:57:59.151889 |
379 |
57680541 |
SOLAR SYSTEM DRINKING WATER PROJECT AT MONDALHAT NETAJI SANGHA CLUB SAN VIII |
836218 |
SOLAR SYSTEM DRINKING WATER PROJECT AT MONDALHAT NETAJI SANGHA CLUB SAN VIII1 |
Roof laid |
-
latitude : 23.6287736
Longitude : 88.1259922
file name : Image_30042024141906371.png
|
2024-04-30 14:19:06.463267 |
380 |
57680541 |
SOLAR SYSTEM DRINKING WATER PROJECT AT MONDALHAT NETAJI SANGHA CLUB SAN VIII |
836218 |
SOLAR SYSTEM DRINKING WATER PROJECT AT MONDALHAT NETAJI SANGHA CLUB SAN VIII1 |
Plinth level |
-
latitude : 23.6287808
Longitude : 88.1259942
file name : Image_30042024141626197.png
|
2024-04-30 14:16:26.278979 |
381 |
57680541 |
SOLAR SYSTEM DRINKING WATER PROJECT AT MONDALHAT NETAJI SANGHA CLUB SAN VIII |
836218 |
SOLAR SYSTEM DRINKING WATER PROJECT AT MONDALHAT NETAJI SANGHA CLUB SAN VIII1 |
Completion of work |
-
latitude : 23.6287747
Longitude : 88.1259926
file name : Image_30042024141046242.png
|
2024-04-30 14:10:46.8293 |
382 |
69463938 |
Construction of roads |
217554 |
Construction of roads1 |
Roof laid |
-
latitude : 23.628427,23.628427
Longitude : 88.1432273,88.1432273
file name : Image_27042024115207755.png
|
2024-04-27 11:52:07.869569 |
383 |
69463938 |
Construction of roads |
217554 |
Construction of roads1 |
Plinth level |
-
latitude : 23.6284286,23.6284286
Longitude : 88.1432243,88.1432243
file name : Image_27042024111009996.png
|
2024-04-27 11:10:10.112149 |
384 |
69463938 |
Construction of roads |
217554 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6294556,23.629865334369242
Longitude : 88.1241052,88.12294947914779
file name : Image_07112023134111495.png
|
2023-11-07 13:41:11.602977 |
385 |
69705740 |
Creation of drainage channel for management of grey water |
284746 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.6287815
Longitude : 88.1259791
file name : Image_17052024151209447.png
|
2024-05-17 15:12:09.558433 |
386 |
69705740 |
Creation of drainage channel for management of grey water |
284746 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.6287807
Longitude : 88.125982
file name : Image_17052024150841481.png
|
2024-05-17 15:08:41.580519 |
387 |
69705740 |
Creation of drainage channel for management of grey water |
284746 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.61842667683959
Longitude : 88.12555926851928
file name : Image_04112023133530025.png
|
2023-11-04 13:35:30.230367 |
388 |
69463703 |
Repairing and maintenance of roads |
237796 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 23.612701250240207,23.612701250240207
Longitude : 88.12000625766814,88.12000625766814
file name : Image_05122023162943028.png
|
2023-12-05 16:29:43.115538 |
389 |
69463703 |
Repairing and maintenance of roads |
237796 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 23.612690228037536,23.612690228037536
Longitude : 88.11999988742173,88.11999988742173
file name : Image_05122023161902375.png
|
2023-12-05 16:19:02.473393 |
390 |
69463703 |
Repairing and maintenance of roads |
237796 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 23.61264576204121,23.61264576204121
Longitude : 88.11996661126614,88.11996661126614
file name : Image_04112023132724811.png
|
2023-11-04 13:27:25.055626 |
391 |
69705486 |
Creation of drainage channel for management of grey water |
223316 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.615782437846065
Longitude : 88.1211412511766
file name : Image_05122023163709382.png
|
2023-12-05 16:37:09.471006 |
392 |
69705486 |
Creation of drainage channel for management of grey water |
223316 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.615792118944228
Longitude : 88.12113764695823
file name : Image_05122023163250136.png
|
2023-12-05 16:32:50.232593 |
393 |
69705486 |
Creation of drainage channel for management of grey water |
223316 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.61579291522503
Longitude : 88.12114879488945
file name : Image_04112023133046309.png
|
2023-11-04 13:30:46.550995 |
394 |
69704356 |
Creation of drainage channel for management of grey water |
210087 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.6308283
Longitude : 88.139659
file name : Image_24112023114824639.png
|
2023-11-24 11:48:24.73394 |
395 |
69704356 |
Creation of drainage channel for management of grey water |
210087 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.6308283
Longitude : 88.139659
file name : Image_24112023114240752.png
|
2023-11-24 11:42:40.847131 |
396 |
69704356 |
Creation of drainage channel for management of grey water |
210087 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.6308325
Longitude : 88.1396376
file name : Image_09112023123846491.png
|
2023-11-09 12:38:46.611954 |
397 |
69460968 |
Procurement of Computer |
74197 |
Procurement of Computer1 |
|
-
latitude : 23.6287523
Longitude : 88.125952
file name : Image_11092024153056580.png
|
2024-09-11 15:30:57.53701 |
398 |
69464770 |
Repairing and maintenance of roads |
185410 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 23.6287803,23.6287803
Longitude : 88.1259908,88.1259908
file name : Image_20062024124004821.png
|
2024-06-20 12:40:04.906225 |
399 |
69464770 |
Repairing and maintenance of roads |
185410 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 23.6287989,23.6287989
Longitude : 88.1259801,88.1259801
file name : Image_20062024123835854.png
|
2024-06-20 12:38:35.944022 |
400 |
69464770 |
Repairing and maintenance of roads |
185410 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 23.6287924,23.6287924
Longitude : 88.1259958,88.1259958
file name : Image_20062024123626836.png
|
2024-06-20 12:36:26.952846 |
401 |
69461898 |
Construction of roads |
195316 |
Construction of roads1 |
Roof laid |
-
latitude : 23.628409,23.628409
Longitude : 88.1432481,88.1432481
file name : Image_07122023183915240.png
|
2023-12-07 18:39:15.366267 |
402 |
69461898 |
Construction of roads |
195316 |
Construction of roads1 |
Plinth level |
-
latitude : 23.628409,23.628409
Longitude : 88.1432496,88.1432496
file name : Image_07122023183603176.png
|
2023-12-07 18:36:03.280793 |
403 |
69461898 |
Construction of roads |
195316 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6284024,23.6284024
Longitude : 88.1432359,88.1432359
file name : Image_09112023115510498.png
|
2023-11-09 11:55:10.601463 |
404 |
89470565 |
Construction of roads |
94740 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6287947,23.6287947
Longitude : 88.1259475,88.1259475
file name : Image_25092024180223661.png
|
2024-09-25 18:02:23.764043 |
405 |
89470565 |
Construction of roads |
94740 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6287947,23.6287947
Longitude : 88.1259475,88.1259475
file name : Image_25092024180219689.png
|
2024-09-25 18:02:19.784334 |
406 |
89470565 |
Construction of roads |
94740 |
Construction of roads1 |
Plinth level |
-
latitude : 23.6287966,23.6287966
Longitude : 88.1259528,88.1259528
file name : Image_25092024175938514.png
|
2024-09-25 17:59:38.604938 |
407 |
89470565 |
Construction of roads |
94740 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6287881,23.6287881
Longitude : 88.1259477,88.1259477
file name : Image_25092024175607815.png
|
2024-09-25 17:56:07.902614 |
408 |
90105075 |
Creation of drainage channel for management of grey water |
187490 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.6288067
Longitude : 88.1259602
file name : Image_30092024163607008.png
|
2024-09-30 16:36:07.099634 |
409 |
90105075 |
Creation of drainage channel for management of grey water |
187490 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.6287953
Longitude : 88.1259651
file name : Image_30092024163425360.png
|
2024-09-30 16:34:26.058448 |
410 |
90105075 |
Creation of drainage channel for management of grey water |
187490 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.6287953
Longitude : 88.1259651
file name : Image_30092024163429042.png
|
2024-09-30 16:34:29.804037 |
411 |
90105075 |
Creation of drainage channel for management of grey water |
187490 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.629019013606012
Longitude : 88.125981381163
file name : Image_30092024163422390.png
|
2024-09-30 16:34:22.48257 |
412 |
90105075 |
Creation of drainage channel for management of grey water |
187490 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.628795
Longitude : 88.1259715
file name : Image_30092024163049035.png
|
2024-09-30 16:30:49.124192 |
413 |
89470766 |
Repairing and maintenance of roads |
170000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 23.6287996,23.6287996
Longitude : 88.1259684,88.1259684
file name : Image_30092024145702266.png
|
2024-09-30 14:57:02.360282 |
414 |
89470766 |
Repairing and maintenance of roads |
170000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 23.6287918,23.6287918
Longitude : 88.1259587,88.1259587
file name : Image_30092024145445689.png
|
2024-09-30 14:54:45.783538 |
415 |
89470766 |
Repairing and maintenance of roads |
170000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 23.6287973,23.6287973
Longitude : 88.1259699,88.1259699
file name : Image_30092024145148554.png
|
2024-09-30 14:51:48.660042 |
416 |
89471086 |
Construction of roads |
184400 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6287865,23.6287865
Longitude : 88.125972,88.125972
file name : Image_30092024150935856.png
|
2024-09-30 15:09:35.943032 |
417 |
89471086 |
Construction of roads |
184400 |
Construction of roads1 |
Plinth level |
-
latitude : 23.628778,23.628778
Longitude : 88.1259733,88.1259733
file name : Image_30092024150554162.png
|
2024-09-30 15:05:54.245249 |
418 |
89471086 |
Construction of roads |
184400 |
Construction of roads1 |
Completion of work |
-
latitude : 23.628786,23.628786
Longitude : 88.1259736,88.1259736
file name : Image_30092024150349633.png
|
2024-09-30 15:03:49.737062 |
419 |
69462410 |
Construction of roads |
148164 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6287936,23.6287936
Longitude : 88.1259678,88.1259678
file name : Image_24072024140409070.png
|
2024-07-24 14:04:09.253261 |
420 |
69462410 |
Construction of roads |
148164 |
Construction of roads1 |
Plinth level |
-
latitude : 23.6287884,23.6287884
Longitude : 88.1259684,88.1259684
file name : Image_24072024135901279.png
|
2024-07-24 13:59:01.375137 |
421 |
69462410 |
Construction of roads |
148164 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6287981,23.6287415
Longitude : 88.1259697,88.1259711
file name : Image_24072024135645665.png
|
2024-07-24 13:56:45.765225 |