1 |
48764738 |
CONSTRUCTION OF PCC ROAD FROM RAMJI HOUSE TO RAJU SARKAR HOUSE |
195160 |
CONSTRUCTION OF PCC ROAD FROM RAMJI HOUSE TO RAJU SARKAR HOUSE 1 |
Plinth level |
-
latitude : 23.5717883,23.5707006
Longitude : 87.1895675,87.1904487
file name : Image_20072022121812640.png
|
2022-07-20 12:18:12.714177 |
2 |
48764738 |
CONSTRUCTION OF PCC ROAD FROM RAMJI HOUSE TO RAJU SARKAR HOUSE |
195160 |
CONSTRUCTION OF PCC ROAD FROM RAMJI HOUSE TO RAJU SARKAR HOUSE 1 |
Completion of work |
-
latitude : 23.571434999999997,23.5717279
Longitude : 87.19047833333335,87.1895858
file name : Image_02052022125955077.png
|
2022-05-02 12:59:55.179575 |
3 |
48764738 |
CONSTRUCTION OF PCC ROAD FROM RAMJI HOUSE TO RAJU SARKAR HOUSE |
195160 |
CONSTRUCTION OF PCC ROAD FROM RAMJI HOUSE TO RAJU SARKAR HOUSE 1 |
Completion of work |
-
latitude : 23.571730000000002,23.5717872
Longitude : 87.19047666666665,87.1895266
file name : Image_02052022125949408.png
|
2022-05-02 12:59:49.511168 |
4 |
48777555 |
CONSTRUCTION OF PCC ROAD FROM UREDOBA TO SWAPAN BAURI HOUSE |
350000 |
CONSTRUCTION OF PCC ROAD FROM UREDOBA TO SWAPAN BAURI HOUSE1 |
Completion of work |
-
latitude : 23.566531666666666,23.56650833333333
Longitude : 87.20768666666666,87.20768666666666
file name : Image_02052022125943245.png
|
2022-05-02 12:59:43.34794 |
5 |
48841723 |
MANTENANCE OF DRINKING WATER SOURCE |
100000 |
MANTENANCE OF DRINKING WATER SOURCE1 |
Completion of work |
-
latitude : 23.566258333333334,23.56625166666667
Longitude : 87.20620500000001,87.20618333333331
file name : Image_02052022130001078.png
|
2022-05-02 13:00:01.175194 |
6 |
48788072 |
CONSTRUCTION DRAIN OKHIL SHARMA HOUSE TO TOTAN BHOUMIK HOUSE |
170000 |
CONSTRUCTION DRAIN OKHIL SHARMA HOUSE TO TOTAN BHOUMIK HOUSE1 |
Plinth level |
-
latitude : 23.5711498,23.571716666666664
Longitude : 87.191141,87.19123333333333
file name : Image_15092022132125055.png
|
2022-09-15 13:21:25.131918 |
7 |
48788072 |
CONSTRUCTION DRAIN OKHIL SHARMA HOUSE TO TOTAN BHOUMIK HOUSE |
170000 |
CONSTRUCTION DRAIN OKHIL SHARMA HOUSE TO TOTAN BHOUMIK HOUSE1 |
Completion of work |
-
latitude : 23.5712869,23.5712869
Longitude : 87.1911429,87.1911429
file name : Image_22072022122738366.png
|
2022-07-22 12:27:38.447946 |
8 |
48789789 |
CONSTRUCTION OF SHALLOW AT SRIRAMPUR AREA |
122000 |
CONSTRUCTION OF SHALLOW AT SRIRAMPUR AREA1 |
Completion of work |
-
latitude : 23.560863333333334,23.56087
Longitude : 87.20895999999999,87.20897000000001
file name : Image_22072022122732475.png
|
2022-07-22 12:27:32.560379 |
9 |
48842073 |
CONSTRUCTION OF DRAIN AT SRIRAMPUR DANGAL PARA |
170000 |
CONSTRUCTION OF DRAIN AT SRIRAMPUR DANGAL PARA1 |
Plinth level |
-
latitude : 23.57059166666666,23.564109999999996
Longitude : 87.19144499999999,87.21404666666668
file name : Image_14022023205207514.png
|
2023-02-14 20:52:07.596886 |
10 |
48842073 |
CONSTRUCTION OF DRAIN AT SRIRAMPUR DANGAL PARA |
170000 |
CONSTRUCTION OF DRAIN AT SRIRAMPUR DANGAL PARA1 |
Completion of work |
-
latitude : 23.5583789,23.564385
Longitude : 87.2215518,87.21367833333333
file name : Image_22072022122729310.png
|
2022-07-22 12:27:29.391773 |
11 |
48842073 |
CONSTRUCTION OF DRAIN AT SRIRAMPUR DANGAL PARA |
170000 |
CONSTRUCTION OF DRAIN AT SRIRAMPUR DANGAL PARA1 |
Completion of work |
-
latitude : 23.56406666666667,23.564379999999996
Longitude : 87.21406999999999,87.21370999999999
file name : Image_14022023205153522.png
|
2023-02-14 20:51:53.609083 |
12 |
35016013 |
CONT.OF PCC ROAD SURJO SINGH HOUSE TO ALOK SINGH HOUSE |
151000 |
CONT.OF PCC ROAD SURJO SINGH HOUSE TO ALOK SINGH HOUSE1 |
Plinth level |
-
latitude : 23.562455,23.562463333333334
Longitude : 87.20010666666667,87.20037333333333
file name : Image_13122021145922974.png
|
2021-12-13 14:59:23.086296 |
13 |
35014724 |
CONT.OF PCC ROAD SHANTI BAURI HOUSE TO ASIT BAURI HOUSE |
151000 |
CONT.OF PCC ROAD SHANTI BAURI HOUSE TO ASIT BAURI HOUSE1 |
Plinth level |
-
latitude : 23.563554999999997,23.56406666666667
Longitude : 87.203365,87.20363
file name : Image_13122021145928406.png
|
2021-12-13 14:59:28.505885 |
14 |
35015187 |
CONT.OF PCC ROAD JOYDEV GHOSH HOUSE TO KURAN MONDAL HOUSE |
106000 |
CONT.OF PCC ROAD JOYDEV GHOSH HOUSE TO KURAN MONDAL HOUSE1 |
Plinth level |
-
latitude : 23.5675419,23.5675419
Longitude : 87.198159,87.1981581
file name : Image_13122021145918058.png
|
2021-12-13 14:59:18.171657 |
15 |
39058572 |
CONSTRUCTION IRRIGATION CHANNEL FROM SUMITRA BAURI HOUSE TO HANUMAN MANDIR |
205000 |
CONSTRUCTION IRRIGATION CHANNEL FROM SUMITRA BAURI HOUSE TO HANUMAN MANDIR1 |
Plinth level |
-
latitude : 23.565631666666665
Longitude : 87.20621000000001
file name : Image_13122021145935077.png
|
2021-12-13 14:59:35.181642 |
16 |
39058533 |
CONSTRUCTION IRRIGATION CHANNEL FROM SUBHASH BISWAS HOUSE TO KAMAL DEVNATH HOUSE |
260000 |
CONSTRUCTION IRRIGATION CHANNEL FROM SUBHASH BISWAS HOUSE TO KAMAL DEVNATH HOUSE 1 |
Plinth level |
-
latitude : 23.56963166666667
Longitude : 87.19501666666665
file name : Image_13122021145912578.png
|
2021-12-13 14:59:12.706579 |
17 |
39058607 |
CONSTRUCTION IRRIGATION CHANNEL FROM PURONO MANASA MANDIR TO BHATA |
201000 |
CONSTRUCTION IRRIGATION CHANNEL FROM PURONO MANASA MANDIR TO BHATA1 |
Plinth level |
-
latitude : 23.560615
Longitude : 87.20848166666669
file name : Image_13122021145938665.png
|
2021-12-13 14:59:38.809608 |
18 |
39058544 |
CONSTRUCTION IRRIGATION CHANNEL FROM TAPAN CHATTERJEE HOUSE TO RAJU GHOSH HOUSE |
258500 |
CONSTRUCTION IRRIGATION CHANNEL FROM TAPAN CHATTERJEE HOUSE TO RAJU GHOSH HOUSE 1 |
Completion of work |
-
latitude : 23.571808333333333
Longitude : 87.19109333333333
file name : Image_12032021151626978.png
|
2021-03-12 15:16:27.073999 |
19 |
35033606 |
CONT. PCC ROAD FROM AASIYA KHATOON HOUSE TO MOHIN ANSARI HOUSE |
82000 |
CONT. PCC ROAD FROM AASIYA KHATOON HOUSE TO MOHIN ANSARI HOUSE 1 |
Completion of work |
-
latitude : 23.57398333333333,23.573841666666667
Longitude : 87.18992166666666,87.189845
file name : Image_22072021131839104.png
|
2021-07-22 13:18:39.200301 |
20 |
39058626 |
EXTENSION IRRIGATION CHANNEL FROM MADHU MAHANTO HOUSE TO WARDS SOUTH |
46745 |
EXTENSION IRRIGATION CHANNEL FROM MADHU MAHANTO HOUSE TO WARDS SOUTH1 |
Completion of work |
-
latitude : 23.561836666666668
Longitude : 87.21005833333332
file name : Image_12032021155516440.png
|
2021-03-12 15:55:16.548531 |
21 |
39066885 |
CONSTRUCTION DRAIN WITH COVER AT SRIRAMPUR GP |
98455 |
CONSTRUCTION DRAIN WITH COVER AT SRIRAMPUR GP1 |
Completion of work |
-
latitude : 23.565031666666663,23.56513
Longitude : 87.21054000000001,87.210265
file name : Image_22072021131843999.png
|
2021-07-22 13:18:44.09251 |
22 |
39066885 |
CONSTRUCTION DRAIN WITH COVER AT SRIRAMPUR GP |
98455 |
CONSTRUCTION DRAIN WITH COVER AT SRIRAMPUR GP1 |
Completion of work |
-
latitude : 23.565060000000003,23.565121666666663
Longitude : 87.21048166666667,87.21027833333333
file name : Image_02082021153049015.png
|
2021-08-02 15:30:49.107913 |
23 |
35015652 |
CONT.OF DRAIN ARUN GHOSH HOUSE TO JITEN GHOSH HOUSE |
233500 |
CONT.OF DRAIN ARUN GHOSH HOUSE TO JITEN GHOSH HOUSE1 |
Completion of work |
-
latitude : 23.56272333333333,23.56248666666667
Longitude : 87.199905,87.19968833333333
file name : Image_02082021153052005.png
|
2021-08-02 15:30:52.124397 |
24 |
35011550 |
CONT. OF PCC ROAD FROM MONGAL BAURI HOUSE TO SUMITRA BOURI |
124000 |
CONT. OF PCC ROAD FROM MONGAL BAURI HOUSE TO SUMITRA BOURI1 |
Plinth level |
-
latitude : 23.565229999999996,23.56525
Longitude : 87.20706666666668,87.20689666666667
file name : Image_12032021153334309.png
|
2021-03-12 15:33:34.427071 |
25 |
35011550 |
CONT. OF PCC ROAD FROM MONGAL BAURI HOUSE TO SUMITRA BOURI |
124000 |
CONT. OF PCC ROAD FROM MONGAL BAURI HOUSE TO SUMITRA BOURI1 |
Completion of work |
-
latitude : 23.56522,23.565198333333335
Longitude : 87.20696000000001,87.20705000000001
file name : Image_02032021152354942.png
|
2021-03-02 15:23:55.035811 |
26 |
35032421 |
CONT. OF PCC ROAD FROM GUNUMOY SUTRADHAR HOUSE TO ACCHELAL PASWAN HOUSE |
130000 |
CONT. OF PCC ROAD FROM GUNUMOY SUTRADHAR HOUSE TO ACCHELAL PASWAN HOUSE1 |
Plinth level |
-
latitude : 23.572240000000004,23.572373333333335
Longitude : 87.19126833333333,87.19088666666667
file name : Image_12032021151505208.png
|
2021-03-12 15:15:05.304763 |
27 |
35032421 |
CONT. OF PCC ROAD FROM GUNUMOY SUTRADHAR HOUSE TO ACCHELAL PASWAN HOUSE |
130000 |
CONT. OF PCC ROAD FROM GUNUMOY SUTRADHAR HOUSE TO ACCHELAL PASWAN HOUSE1 |
Completion of work |
-
latitude : 23.5720253,23.5722097
Longitude : 87.1912548,87.1907932
file name : Image_02032021152346971.png
|
2021-03-02 15:23:47.065485 |
28 |
35014139 |
CONT.OF PCC ROAD BIRBAL SINGH HOUSE TO DURGA MANDIR |
156050 |
CONT.OF PCC ROAD BIRBAL SINGH HOUSE TO DURGA MANDIR 1 |
Plinth level |
-
latitude : 23.562614999999997,23.562476666666665
Longitude : 87.20073666666667,87.200415
file name : Image_12032021152701618.png
|
2021-03-12 15:27:01.714301 |
29 |
35014139 |
CONT.OF PCC ROAD BIRBAL SINGH HOUSE TO DURGA MANDIR |
156050 |
CONT.OF PCC ROAD BIRBAL SINGH HOUSE TO DURGA MANDIR 1 |
Completion of work |
-
latitude : 23.562614999999997,23.562481666666667
Longitude : 87.20072833333333,87.20041833333335
file name : Image_02032021152350950.png
|
2021-03-02 15:23:51.041852 |
30 |
35028481 |
BEAUTI FICATION OF GOYLA BANDH POND |
132000 |
BEAUTI FICATION OF GOYLA BANDH POND 1 |
Plinth level |
-
latitude : 23.565136666666664,23.56652
Longitude : 87.2112,87.20900166666667
file name : Image_12032021151454387.png
|
2021-03-12 15:14:54.492484 |
31 |
35028481 |
BEAUTI FICATION OF GOYLA BANDH POND |
132000 |
BEAUTI FICATION OF GOYLA BANDH POND 1 |
Completion of work |
-
latitude : 23.56668666666667,23.566514999999995
Longitude : 87.20861833333332,87.20900166666667
file name : Image_01032021160514816.png
|
2021-03-01 16:05:14.903659 |
32 |
58207111 |
CONSTRUCTION PCC ROAD MUKTI HOUSE TO SHIBMANDIR |
100000 |
CONSTRUCTION PCC ROAD MUKTI HOUSE TO SHIBMANDIR1 |
Plinth level |
-
latitude : 23.5693407,23.569176666666667
Longitude : 87.1939041,87.19390666666668
file name : Image_27022023112633207.png
|
2023-02-27 11:26:33.267051 |
33 |
58207111 |
CONSTRUCTION PCC ROAD MUKTI HOUSE TO SHIBMANDIR |
100000 |
CONSTRUCTION PCC ROAD MUKTI HOUSE TO SHIBMANDIR1 |
Completion of work |
-
latitude : 23.5693354,23.5693344
Longitude : 87.1939096,87.1939096
file name : Image_21022023145144683.png
|
2023-02-21 14:51:44.748674 |
34 |
48769656 |
CONSTRUCTION OF PCC ROAD SRIRAMPUR DAS PARA NEAR RADHA GOBINDO MANDIR |
150000 |
CONSTRUCTION OF PCC ROAD SRIRAMPUR DAS PARA NEAR RADHA GOBINDO MANDIR1 |
Plinth level |
-
latitude : 23.562658333333335,23.562524999999997
Longitude : 87.21018000000001,87.21057166666667
file name : Image_24022023154833058.png
|
2023-02-24 15:48:33.12134 |
35 |
48769656 |
CONSTRUCTION OF PCC ROAD SRIRAMPUR DAS PARA NEAR RADHA GOBINDO MANDIR |
150000 |
CONSTRUCTION OF PCC ROAD SRIRAMPUR DAS PARA NEAR RADHA GOBINDO MANDIR1 |
Completion of work |
-
latitude : 23.56244,23.562631666666668
Longitude : 87.21065666666667,87.21025833333333
file name : Image_24022023121926149.png
|
2023-02-24 12:19:26.241779 |
36 |
48765988 |
CONSTRUCTION OF BOUNDARY WALL AT COMMINITEE HALL BAURIPARA |
100000 |
CONSTRUCTION OF BOUNDARY WALL AT COMMINITEE HALL BAURIPARA1 |
Plinth level |
-
latitude : 23.565583333333333
Longitude : 87.20626333333333
file name : Image_15032023140957067.png
|
2023-03-15 14:09:57.132291 |
37 |
48765988 |
CONSTRUCTION OF BOUNDARY WALL AT COMMINITEE HALL BAURIPARA |
100000 |
CONSTRUCTION OF BOUNDARY WALL AT COMMINITEE HALL BAURIPARA1 |
Completion of work |
-
latitude : 23.565778333333334
Longitude : 87.20632833333333
file name : Image_24022023152858753.png
|
2023-02-24 15:28:58.834763 |
38 |
58218154 |
CONSTRUCTION DRAIN FROM MAIN ROAD TO PRASANTA GHOSH HOUSE |
100000 |
CONSTRUCTION DRAIN FROM MAIN ROAD TO PRASANTA GHOSH HOUSE1 |
Completion of work |
-
latitude : 23.563183333333335,23.562779999999997
Longitude : 87.20231166666666,87.20207333333335
file name : Image_24022023152855327.png
|
2023-02-24 15:28:55.396439 |
39 |
58208643 |
CONSTRUCTION OF PCC ROAD FROM DANGAL PARA DURGA MANDIR TO SINGARAN |
180000 |
CONSTRUCTION OF PCC ROAD FROM DANGAL PARA DURGA MANDIR TO SINGARAN1 |
Completion of work |
-
latitude : 23.565286666666665,23.564931666666666
Longitude : 87.214325,87.21402333333332
file name : Image_24052023123345200.png
|
2023-05-24 12:33:45.320189 |
40 |
66576888 |
Creation of a new source of drinking water |
494225 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.57046833333333
Longitude : 87.19243833333333
file name : Image_06042023115447681.png
|
2023-04-06 11:54:47.808448 |
41 |
58220464 |
CONSTRUCTION DRAIN KANAI BAURI HOUSE TO SWAPAN LAL HOUSE |
84200 |
CONSTRUCTION DRAIN KANAI BAURI HOUSE TO SWAPAN LAL HOUSE1 |
Plinth level |
-
latitude : 23.568828333333332,23.5683038
Longitude : 87.19313500000001,87.1930419
file name : Image_18042023112028400.png
|
2023-04-18 11:20:28.477265 |
42 |
58220464 |
CONSTRUCTION DRAIN KANAI BAURI HOUSE TO SWAPAN LAL HOUSE |
84200 |
CONSTRUCTION DRAIN KANAI BAURI HOUSE TO SWAPAN LAL HOUSE1 |
Completion of work |
-
latitude : 23.568828333333332,23.5683081
Longitude : 87.19306833333333,87.1930391
file name : Image_06042023115507402.png
|
2023-04-06 11:55:07.465132 |
43 |
67287077 |
Augmentation of the existing source of drinking water |
190000 |
Augmentation of the existing source of drinking water1 |
Plinth level |
-
latitude : 23.56506532
Longitude : 87.21122419
file name : Image_23072024163412456.png
|
2024-07-23 16:34:12.547199 |
44 |
67287077 |
Augmentation of the existing source of drinking water |
190000 |
Augmentation of the existing source of drinking water1 |
Completion of work |
-
latitude : 23.5651359
Longitude : 87.2111244
file name : Image_10102023162203173.png
|
2023-10-10 16:22:03.340751 |
45 |
67292205 |
Greywater management system |
120000 |
Greywater management system1 |
Plinth level |
-
latitude : 23.5708152
Longitude : 87.1906207
file name : Image_15052023100323676.png
|
2023-05-15 10:03:23.752968 |
46 |
67292205 |
Greywater management system |
120000 |
Greywater management system1 |
Plinth level |
-
latitude : 23.570373
Longitude : 87.1908102
file name : Image_08052023104121650.png
|
2023-05-08 10:41:21.736884 |
47 |
67292205 |
Greywater management system |
120000 |
Greywater management system1 |
Completion of work |
-
latitude : 23.5703513
Longitude : 87.1908212
file name : Image_03052023155605669.png
|
2023-05-03 15:56:05.733934 |
48 |
66577027 |
Water Supply to villages |
120000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 23.565355
Longitude : 87.20794
file name : Image_24052023131343151.png
|
2023-05-24 13:13:43.271729 |
49 |
66577027 |
Water Supply to villages |
120000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.56538333333333
Longitude : 87.20789833333335
file name : Image_18042023111638229.png
|
2023-04-18 11:16:38.305132 |
50 |
66481036 |
Operation & maintenance of Grey water management system |
99800 |
Operation & maintenance of Grey water management system1 |
Completion of work |
-
latitude : 23.562086666666666
Longitude : 87.19683000000002
file name : Image_07062023182118368.png
|
2023-06-07 18:21:18.433156 |
51 |
58203629 |
CONSTRUCTION OF PCC ROAD WITH CULVERT IN FRONT HOUSE TO SAMIR GHOSH HOUSE |
150000 |
CONSTRUCTION OF PCC ROAD WITH CULVERT IN FRONT HOUSE TO SAMIR GHOSH HOUSE1 |
Completion of work |
-
latitude : 23.5675297,23.567529
Longitude : 87.198172,87.1981719
file name : Image_07062023183300988.png
|
2023-06-07 18:33:01.044585 |
52 |
67646803 |
Providing piped water supply to public institutions |
288000 |
Providing piped water supply to public institutions1 |
Roof laid |
-
latitude : 23.5663047
Longitude : 87.20626996
file name : Image_11032024175319078.png
|
2024-03-11 17:53:19.179138 |
53 |
67646803 |
Providing piped water supply to public institutions |
288000 |
Providing piped water supply to public institutions1 |
Plinth level |
-
latitude : 23.56622104
Longitude : 87.20626592
file name : Image_11032024131411927.png
|
2024-03-11 13:14:12.04541 |
54 |
67646803 |
Providing piped water supply to public institutions |
288000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 23.5662463
Longitude : 87.20626193
file name : Image_09032024135435097.png
|
2024-03-09 13:54:35.178724 |
55 |
58243519 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA |
100000 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA1 |
Completion of work |
-
latitude : 23.5651413
Longitude : 87.2111176
file name : Image_12122023151530632.png
|
2023-12-12 15:15:30.729899 |
56 |
58243519 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA |
100000 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA2 |
Completion of work |
-
latitude : 23.57041279
Longitude : 87.19274037
file name : Image_21122023125052696.png
|
2023-12-21 12:50:52.784443 |
57 |
58243519 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA |
100000 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA3 |
Completion of work |
-
latitude : 23.56899966
Longitude : 87.19305354
file name : Image_21122023125056006.png
|
2023-12-21 12:50:56.08791 |
58 |
67644301 |
Creation of a new source of drinking water |
290000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.55935117
Longitude : 87.20418449
file name : Image_01042024152552388.png
|
2024-04-01 15:25:52.489139 |
59 |
67644301 |
Creation of a new source of drinking water |
290000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.5593475
Longitude : 87.20421245
file name : Image_16012024121327489.png
|
2024-01-16 12:13:27.604287 |
60 |
67644301 |
Creation of a new source of drinking water |
290000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.55932983
Longitude : 87.2041559
file name : Image_12012024104824480.png
|
2024-01-12 10:48:24.568456 |
61 |
67686378 |
Creation of drainage channel for management of grey water |
175000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.5651446
Longitude : 87.2111301
file name : Image_16012024125037529.png
|
2024-01-16 12:50:37.625409 |
62 |
67686378 |
Creation of drainage channel for management of grey water |
175000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.56901693
Longitude : 87.19311549
file name : Image_16012024121330352.png
|
2024-01-16 12:13:30.448756 |
63 |
67686378 |
Creation of drainage channel for management of grey water |
175000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.56869373
Longitude : 87.19309793
file name : Image_12012024104820702.png
|
2024-01-12 10:48:20.782978 |
64 |
58243519 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA |
100000 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA4 |
Completion of work |
-
latitude : 23.5693567
Longitude : 87.1938776
file name : Image_21122023125059160.png
|
2023-12-21 12:50:59.250782 |
65 |
58243519 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA |
100000 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA5 |
Completion of work |
-
latitude : 23.57161631
Longitude : 87.19575215
file name : Image_28122023122031501.png
|
2023-12-28 12:20:31.593894 |
66 |
58243519 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA |
100000 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA6 |
Completion of work |
-
latitude : 23.56263828
Longitude : 87.19984201
file name : Image_28122023122034605.png
|
2023-12-28 12:20:34.700833 |
67 |
58243519 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA |
100000 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA7 |
Completion of work |
-
latitude : 23.56331334
Longitude : 87.20413587
file name : Image_28122023122037504.png
|
2023-12-28 12:20:37.606633 |
68 |
58243519 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA |
100000 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA8 |
Completion of work |
-
latitude : 23.56335269
Longitude : 87.20387194
file name : Image_28122023122040383.png
|
2023-12-28 12:20:40.522973 |
69 |
58243519 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA |
100000 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA10 |
Completion of work |
-
latitude : 23.55501818
Longitude : 87.21453323
file name : Image_28122023122049118.png
|
2023-12-28 12:20:49.20232 |
70 |
58243519 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA |
100000 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA10 |
Completion of work |
-
latitude : 23.55545466
Longitude : 87.21383699
file name : Image_28122023122046324.png
|
2023-12-28 12:20:46.422342 |
71 |
58243519 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA |
100000 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA11 |
Completion of work |
-
latitude : 23.55471257
Longitude : 87.21466722
file name : Image_28122023122051947.png
|
2023-12-28 12:20:52.044349 |
72 |
58243519 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA |
100000 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA12 |
Completion of work |
-
latitude : 23.55803147
Longitude : 87.21188203
file name : Image_28122023122054764.png
|
2023-12-28 12:20:54.862364 |
73 |
58243519 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA |
100000 |
REPAIRING AND MAINTAINACE OF TUBE WELL AND ALL GP AREA12 |
Completion of work |
-
latitude : 23.56516064
Longitude : 87.2072904
file name : Image_28122023122043263.png
|
2023-12-28 12:20:43.359164 |
74 |
67648531 |
Any other operation and maintenance needs related to solid waste management |
75000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 23.56201419
Longitude : 87.19703361
file name : Image_13122023114609091.png
|
2023-12-13 11:46:09.186603 |
75 |
67648531 |
Any other operation and maintenance needs related to solid waste management |
75000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 23.5675173
Longitude : 87.1981729
file name : Image_08122023113241984.png
|
2023-12-08 11:32:42.087901 |
76 |
67708537 |
Construction of roads |
76000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.5651389,23.5651389
Longitude : 87.2111349,87.2111349
file name : Image_29122023114750476.png
|
2023-12-29 11:47:50.55693 |
77 |
67708537 |
Construction of roads |
76000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.56396901,23.56396542
Longitude : 87.21485203,87.21494793
file name : Image_29122023111746300.png
|
2023-12-29 11:17:46.281543 |
78 |
67708537 |
Construction of roads |
76000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.56395596,23.56396754
Longitude : 87.21481881,87.21507891
file name : Image_18122023123843608.png
|
2023-12-18 12:38:43.728552 |
79 |
67644902 |
Creation of a new source of drinking water |
290000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.55785604
Longitude : 87.21192167
file name : Image_18032024123631884.png
|
2024-03-18 12:36:31.997214 |
80 |
67644902 |
Creation of a new source of drinking water |
290000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.55795897
Longitude : 87.21186958
file name : Image_14032024130717135.png
|
2024-03-14 13:07:17.244672 |
81 |
67709032 |
Functional Equipment |
60000 |
Functional Equipment1 |
|
-
latitude : 23.5651245
Longitude : 87.211144
file name : Image_09092024165744337.png
|
2024-09-09 16:59:30.722241 |
82 |
89352440 |
Drainage Construction |
140000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.56532413
Longitude : 87.20684297
file name : Image_23102024114427413.png
|
2024-10-23 11:44:27.538641 |
83 |
89352440 |
Drainage Construction |
140000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.56528744
Longitude : 87.20680933
file name : Image_29092024130831974.png
|
2024-09-29 13:08:32.058881 |
84 |
89352440 |
Drainage Construction |
140000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.56527137
Longitude : 87.2068031
file name : Image_19092024174618336.png
|
2024-09-19 17:46:18.411266 |
85 |
89352317 |
Drainage Construction |
140000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.56534308
Longitude : 87.2101335
file name : Image_23102024114423814.png
|
2024-10-23 11:44:23.92392 |
86 |
89352317 |
Drainage Construction |
140000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.5651946
Longitude : 87.2102649
file name : Image_19092024174622000.png
|
2024-09-19 17:46:22.08632 |
87 |
67709279 |
Maintenance of school buildings |
80000 |
Maintenance of school buildings1 |
Plinth level |
-
latitude : 23.56495244
Longitude : 87.20740659
file name : Image_23102024114430849.png
|
2024-10-23 11:44:30.939274 |
88 |
67709279 |
Maintenance of school buildings |
80000 |
Maintenance of school buildings1 |
Completion of work |
-
latitude : 23.56489183
Longitude : 87.20750399
file name : Image_29092024124632719.png
|
2024-09-29 12:46:32.80391 |
89 |
89223095 |
Electricity Connection/ Electricity bill payment in Gram Panchayat Bhawan |
20000 |
Electricity Connection/ Electricity bill payment in Gram Panchayat Bhawan1 |
Plinth level |
-
latitude : 23.5651185
Longitude : 87.2111328
file name : Image_04102024135808640.png
|
2024-10-04 13:58:08.740729 |
90 |
89223095 |
Electricity Connection/ Electricity bill payment in Gram Panchayat Bhawan |
20000 |
Electricity Connection/ Electricity bill payment in Gram Panchayat Bhawan1 |
Completion of work |
-
latitude : 23.5708521
Longitude : 87.1917947
file name : Image_04102024131132405.png
|
2024-10-04 13:11:32.55121 |
91 |
58609960 |
CONSTRUCTION NEW GHAT AT MUDI POND |
150000 |
CONSTRUCTION NEW GHAT AT MUDI POND1 |
Plinth level |
-
latitude : 23.561939999999996
Longitude : 87.20755499999999
file name : Image_21032023124743352.png
|
2023-03-21 12:47:43.418143 |
92 |
58609960 |
CONSTRUCTION NEW GHAT AT MUDI POND |
150000 |
CONSTRUCTION NEW GHAT AT MUDI POND1 |
Completion of work |
-
latitude : 23.561946666666667
Longitude : 87.20761333333333
file name : Image_24022023121929282.png
|
2023-02-24 12:19:29.342743 |
93 |
48841530 |
CONSTRUCTION OF DRAIN JHANTU GHOSH HOUSE TO RABI GHOSH |
227000 |
CONSTRUCTION OF DRAIN JHANTU GHOSH HOUSE TO RABI GHOSH 1 |
Completion of work |
-
latitude : 23.56378666666667,23.563663333333338
Longitude : 87.19957333333332,87.19948166666667
file name : Image_22072022122735425.png
|
2022-07-22 12:27:35.512117 |
94 |
48789155 |
CONSTRUCTION OF DRAIN REHANA KHATOON TO HIGH DRAIN |
88250 |
CONSTRUCTION OF DRAIN REHANA KHATOON TO HIGH DRAIN1 |
Plinth level |
-
latitude : 23.573935,23.573964999999998
Longitude : 87.18953333333333,87.18969666666665
file name : Image_14022023205137478.png
|
2023-02-14 20:51:37.57196 |
95 |
48789155 |
CONSTRUCTION OF DRAIN REHANA KHATOON TO HIGH DRAIN |
88250 |
CONSTRUCTION OF DRAIN REHANA KHATOON TO HIGH DRAIN1 |
Completion of work |
-
latitude : 23.573930000000004,23.574020000000004
Longitude : 87.18953166666667,87.18971666666667
file name : Image_03012023104403318.png
|
2023-01-03 10:44:03.397063 |
96 |
66748649 |
CONSTRUCTION OF PCC ROAD AT KUTHIRDANGA NEAR ICDS CENTRE ( CENTRE NO 178) |
140000 |
CONSTRUCTION OF PCC ROAD AT KUTHIRDANGA NEAR ICDS CENTRE ( CENTRE NO 178)1 |
Plinth level |
-
latitude : 23.56256166666667,23.56239833333333
Longitude : 87.20360166666666,87.20403499999999
file name : Image_06042023115504034.png
|
2023-04-06 11:55:04.104923 |
97 |
66748649 |
CONSTRUCTION OF PCC ROAD AT KUTHIRDANGA NEAR ICDS CENTRE ( CENTRE NO 178) |
140000 |
CONSTRUCTION OF PCC ROAD AT KUTHIRDANGA NEAR ICDS CENTRE ( CENTRE NO 178)1 |
Completion of work |
-
latitude : 23.56262,23.56242166666667
Longitude : 87.20359333333333,87.20406
file name : Image_06042023115457708.png
|
2023-04-06 11:54:57.777042 |
98 |
66748404 |
CONSTRUCTION OF PCC ROAD FROM MONDAL PARA MAIN ROAD TOWARDSTOWARDS SRIRAMPUR FP SCHOOL |
260000 |
CONSTRUCTION OF PCC ROAD FROM MONDAL PARA MAIN ROAD TOWARDSTOWARDS SRIRAMPUR FP SCHOOL1 |
Plinth level |
-
latitude : 23.562475000000003,23.564611666666664
Longitude : 87.19940166666666,87.211325
file name : Image_06042023115454366.png
|
2023-04-06 11:54:54.438368 |
99 |
66748404 |
CONSTRUCTION OF PCC ROAD FROM MONDAL PARA MAIN ROAD TOWARDSTOWARDS SRIRAMPUR FP SCHOOL |
260000 |
CONSTRUCTION OF PCC ROAD FROM MONDAL PARA MAIN ROAD TOWARDSTOWARDS SRIRAMPUR FP SCHOOL1 |
Completion of work |
-
latitude : 23.5651361,23.572065
Longitude : 87.2111221,87.18883333333333
file name : Image_06042023115434245.png
|
2023-04-06 11:54:34.303795 |
100 |
58198448 |
CONSTRUCTION PCC ROAD WITH CULVERT FROM GOYLA BANDH TO RAGHUNATH BAURI HOUSE |
100000 |
CONSTRUCTION PCC ROAD WITH CULVERT FROM GOYLA BANDH TO RAGHUNATH BAURI HOUSE1 |
Plinth level |
-
latitude : 23.565655,23.56531
Longitude : 87.20795666666666,87.20798166666667
file name : Image_06042023115500859.png
|
2023-04-06 11:55:00.925233 |
101 |
58198448 |
CONSTRUCTION PCC ROAD WITH CULVERT FROM GOYLA BANDH TO RAGHUNATH BAURI HOUSE |
100000 |
CONSTRUCTION PCC ROAD WITH CULVERT FROM GOYLA BANDH TO RAGHUNATH BAURI HOUSE1 |
Completion of work |
-
latitude : 23.56559666666667,23.56557
Longitude : 87.20794,87.20794499999998
file name : Image_06042023115437479.png
|
2023-04-06 11:54:37.543476 |
102 |
58219770 |
DRAIN REPAIRING SAMIRAN BANERJEE HOUSE TO KALU SHAW HOUSE |
100000 |
DRAIN REPAIRING SAMIRAN BANERJEE HOUSE TO KALU SHAW HOUSE1 |
Plinth level |
-
latitude : 23.57042,23.571777
Longitude : 87.19278833333334,87.1933445
file name : Image_06042023115440686.png
|
2023-04-06 11:54:40.750963 |
103 |
58219770 |
DRAIN REPAIRING SAMIRAN BANERJEE HOUSE TO KALU SHAW HOUSE |
100000 |
DRAIN REPAIRING SAMIRAN BANERJEE HOUSE TO KALU SHAW HOUSE1 |
Completion of work |
-
latitude : 23.5717613,23.570449999999997
Longitude : 87.1934846,87.19280666666667
file name : Image_03042023113030557.png
|
2023-04-03 11:30:30.640014 |
104 |
58207858 |
RE CONSTRUCTION OF PCC ROAD GOUTAM MONDAL HOUSE TO KHOKON BHOUMIK HOUSE |
150000 |
RE CONSTRUCTION OF PCC ROAD GOUTAM MONDAL HOUSE TO KHOKON BHOUMIK HOUSE1 |
Plinth level |
-
latitude : 23.570428333333332,23.569883333333337
Longitude : 87.19268833333332,87.19276999999998
file name : Image_26042023100727504.png
|
2023-04-26 10:07:27.566562 |
105 |
58207858 |
RE CONSTRUCTION OF PCC ROAD GOUTAM MONDAL HOUSE TO KHOKON BHOUMIK HOUSE |
150000 |
RE CONSTRUCTION OF PCC ROAD GOUTAM MONDAL HOUSE TO KHOKON BHOUMIK HOUSE1 |
Completion of work |
-
latitude : 23.57048666666667,23.570496666666667
Longitude : 87.19267666666669,87.19269166666666
file name : Image_26042023094541278.png
|
2023-04-26 09:45:41.343848 |
106 |
59335066 |
CONSTRUCTION SHG TRANNING ROOM AT SRITRAMPUR NEAR GP OFFICE BUILDING |
350000 |
CONSTRUCTION SHG TRANNING ROOM AT SRITRAMPUR NEAR GP OFFICE BUILDING 1 |
Plinth level |
-
latitude : 23.565131
Longitude : 87.2111435
file name : Image_23072024161219988.png
|
2024-07-23 16:12:20.108654 |
107 |
59335066 |
CONSTRUCTION SHG TRANNING ROOM AT SRITRAMPUR NEAR GP OFFICE BUILDING |
350000 |
CONSTRUCTION SHG TRANNING ROOM AT SRITRAMPUR NEAR GP OFFICE BUILDING 1 |
Completion of work |
-
latitude : 23.5651167
Longitude : 87.2111152
file name : Image_08052023104011576.png
|
2023-05-08 10:40:11.633742 |
108 |
59322344 |
2 NOS BUS STAND REPAIRING AT KUTHIRDANGA AND SRIRAMPUR |
157000 |
2 NOS BUS STAND REPAIRING AT KUTHIRDANGA AND SRIRAMPUR1 |
Plinth level |
-
latitude : 23.565634999999997
Longitude : 87.20014333333332
file name : Image_28062023112745626.png
|
2023-06-28 11:27:45.685499 |
109 |
59322344 |
2 NOS BUS STAND REPAIRING AT KUTHIRDANGA AND SRIRAMPUR |
157000 |
2 NOS BUS STAND REPAIRING AT KUTHIRDANGA AND SRIRAMPUR1 |
Completion of work |
-
latitude : 23.56564
Longitude : 87.20019666666667
file name : Image_07062023183239587.png
|
2023-06-07 18:32:39.645541 |
110 |
86631856 |
Creation of a new source of drinking water |
346500 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.566140000000004
Longitude : 87.21007
file name : Image_03112023150944295.png
|
2023-11-03 15:09:44.363731 |
111 |
67708210 |
Construction of roads |
120000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.56347089,23.56345616
Longitude : 87.21175287,87.21174599
file name : Image_29122023114753333.png
|
2023-12-29 11:47:53.414032 |
112 |
67708210 |
Construction of roads |
120000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.56364247,23.56377757
Longitude : 87.21125961,87.211499
file name : Image_29122023111740421.png
|
2023-12-29 11:17:40.511015 |
113 |
67708210 |
Construction of roads |
120000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.56384407,23.56364718
Longitude : 87.2114843,87.21129105
file name : Image_18122023122901719.png
|
2023-12-18 12:29:01.815896 |
114 |
48789351 |
CONSTRUCTION OF NEW DRAIN AT RUBI HOUSE TO NAHID HOUSE TO HIGH DRAIN |
77632 |
CONSTRUCTION OF NEW DRAIN AT RUBI HOUSE TO NAHID HOUSE TO HIGH DRAIN1 |
Plinth level |
-
latitude : 23.573768333333337,23.57358
Longitude : 87.18980166666667,87.18998166666667
file name : Image_03012023104359829.png
|
2023-01-03 10:43:59.913476 |
115 |
48789351 |
CONSTRUCTION OF NEW DRAIN AT RUBI HOUSE TO NAHID HOUSE TO HIGH DRAIN |
77632 |
CONSTRUCTION OF NEW DRAIN AT RUBI HOUSE TO NAHID HOUSE TO HIGH DRAIN1 |
Completion of work |
-
latitude : 23.573780000000003,23.573763333333332
Longitude : 87.189815,87.18980000000002
file name : Image_23092022141508311.png
|
2022-09-23 14:15:08.386351 |
116 |
48765160 |
CONSTRUCTION OF PCC ROAD TARA BANU HOUSE AND AKTARI HOUSE TO NAWAB ALAM HOUSE |
120000 |
CONSTRUCTION OF PCC ROAD TARA BANU HOUSE AND AKTARI HOUSE TO NAWAB ALAM HOUSE1 |
Plinth level |
-
latitude : 23.574125000000002,23.5739489
Longitude : 87.18949333333333,87.1898967
file name : Image_27022023112636723.png
|
2023-02-27 11:26:36.781661 |
117 |
48765160 |
CONSTRUCTION OF PCC ROAD TARA BANU HOUSE AND AKTARI HOUSE TO NAWAB ALAM HOUSE |
120000 |
CONSTRUCTION OF PCC ROAD TARA BANU HOUSE AND AKTARI HOUSE TO NAWAB ALAM HOUSE1 |
Completion of work |
-
latitude : 23.57411833333333,23.574511666666663
Longitude : 87.18951999999999,87.18941000000001
file name : Image_24022023121935291.png
|
2023-02-24 12:19:35.364637 |
118 |
58216193 |
CONSTRUCTION DRAIN FROM SANKAR BAURI HOUSE TO PANJOLA |
200000 |
CONSTRUCTION DRAIN FROM SANKAR BAURI HOUSE TO PANJOLA1 |
Plinth level |
-
latitude : 23.564376666666664,23.563768333333336
Longitude : 87.20696166666667,87.20682166666666
file name : Image_24022023121932357.png
|
2023-02-24 12:19:32.416937 |
119 |
58216193 |
CONSTRUCTION DRAIN FROM SANKAR BAURI HOUSE TO PANJOLA |
200000 |
CONSTRUCTION DRAIN FROM SANKAR BAURI HOUSE TO PANJOLA1 |
Completion of work |
-
latitude : 23.563678333333336,23.564298333333333
Longitude : 87.20676666666668,87.20694166666665
file name : Image_21022023134710728.png
|
2023-02-21 13:47:10.794969 |
120 |
58215619 |
CONSTRUCTION DRAIN FROM MANOJ CHAKRABORTY HOUSE TO SURENDRANATH HOUSE |
150000 |
CONSTRUCTION DRAIN FROM MANOJ CHAKRABORTY HOUSE TO SURENDRANATH HOUSE1 |
Completion of work |
-
latitude : 23.563910000000003,23.563779999999998
Longitude : 87.21435000000001,87.21403666666666
file name : Image_02062023155809779.png
|
2023-06-02 15:58:09.84246 |
121 |
67643436 |
Augmentation of existing sources of Drinking Water |
140000 |
Augmentation of existing sources of Drinking Water1 |
Completion of work |
-
latitude : 23.57129525
Longitude : 87.19613833
file name : Image_31072024121830073.png
|
2024-07-31 12:18:30.433274 |
122 |
67707894 |
Construction of Building |
337000 |
Construction of Building1 |
Roof laid |
-
latitude : 23.5651164
Longitude : 87.2111413
file name : Image_20082024162307296.png
|
2024-08-20 16:23:07.455637 |
123 |
67707894 |
Construction of Building |
337000 |
Construction of Building1 |
Plinth level |
-
latitude : 23.5651244
Longitude : 87.2111386
file name : Image_14082024152124915.png
|
2024-08-14 15:21:25.015867 |
124 |
67707894 |
Construction of Building |
337000 |
Construction of Building1 |
Plinth level |
-
latitude : 23.5651415
Longitude : 87.2111241
file name : Image_07122023114327530.png
|
2023-12-07 11:43:27.635178 |
125 |
67707894 |
Construction of Building |
337000 |
Construction of Building1 |
Completion of work |
-
latitude : 23.5651544
Longitude : 87.2111239
file name : Image_23112023115048130.png
|
2023-11-23 11:50:48.186525 |
126 |
67668262 |
Construction of toilets in public institutions |
225000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.5651156
Longitude : 87.2111399
file name : Image_20082024162310960.png
|
2024-08-20 16:23:11.062283 |
127 |
67668262 |
Construction of toilets in public institutions |
225000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.5651211
Longitude : 87.2111346
file name : Image_14082024152127864.png
|
2024-08-14 15:21:27.967352 |
128 |
67668262 |
Construction of toilets in public institutions |
225000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.5651415
Longitude : 87.2111241
file name : Image_07122023114330929.png
|
2023-12-07 11:43:31.030088 |
129 |
67668262 |
Construction of toilets in public institutions |
225000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.5651522
Longitude : 87.2111213
file name : Image_23112023115052432.png
|
2023-11-23 11:50:52.489191 |