1 |
34416215 |
Construction of Pucca Drain from Rajkumar Ruidas House |
200054 |
Construction of Pucca Drain from Rajkumar Ruidas House 1 |
Roof laid |
-
latitude : 23.652040000000003,23.651680000000002
Longitude : 87.24831833333334,87.24844666666668
file name : Image_17032021132340009.png
|
2021-03-17 13:23:40.104469 |
2 |
34416215 |
Construction of Pucca Drain from Rajkumar Ruidas House |
200054 |
Construction of Pucca Drain from Rajkumar Ruidas House 1 |
Roof laid |
-
latitude : 23.65191666666666,23.652041666666666
Longitude : 87.248345,87.24862166666665
file name : Image_17032021131003222.png
|
2021-03-17 13:10:03.304729 |
3 |
34412628 |
Construction of PCC Road from Bablu Ruidas House |
188806 |
Construction of PCC Road from Bablu Ruidas House 1 |
Roof laid |
-
latitude : 23.65168958,23.65172272
Longitude : 87.24865447,87.24860331
file name : Image_25032021140531031.png
|
2021-03-25 14:05:31.110773 |
4 |
34507697 |
Construction of PCC Road from Manoj House to New Culvert |
150000 |
Construction of PCC Road from Manoj House to New Culvert1 |
Roof laid |
-
latitude : 23.65482198,23.65484856
Longitude : 87.23634941,87.23635049
file name : Image_20032021123839532.png
|
2021-03-20 12:38:39.283389 |
5 |
39059080 |
Construction of drain from Maszid to Juli Bauri house |
201581 |
Construction of drain from Maszid to Juli Bauri house1 |
Roof laid |
-
latitude : 23.65127719,23.65127739,23.65127739
Longitude : 87.25670668,87.25670678,87.25670678
file name : Image_24062021161704566.png
|
2021-06-24 16:17:04.684539 |
6 |
34409560 |
Well repearing near Masjid Side |
103065 |
Well repearing near Masjid Side 1 |
Roof laid |
-
latitude : 23.64327481
Longitude : 87.24153282
file name : Image_24062021160959120.png
|
2021-06-24 16:09:59.222376 |
7 |
34409560 |
Well repearing near Masjid Side |
103065 |
Well repearing near Masjid Side 1 |
Roof laid |
-
latitude : 23.65417213
Longitude : 87.24576782
file name : Image_24062021161008965.png
|
2021-06-24 16:10:09.070427 |
8 |
34409560 |
Well repearing near Masjid Side |
103065 |
Well repearing near Masjid Side 1 |
Roof laid |
-
latitude : 23.65417213
Longitude : 87.24576782
file name : Image_24062021161020613.png
|
2021-06-24 16:10:20.700665 |
9 |
39059149 |
Construction of new drain from Manik Mujkherjee house |
341880 |
Construction of new drain from Manik Mujkherjee house 1 |
Roof laid |
-
latitude : 23.6473592,23.6473592
Longitude : 87.2478096,87.2478096
file name : Image_15092021144004782.png
|
2021-09-15 14:40:04.895226 |
10 |
67996322 |
Creation of a new source of drinking water |
174600 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.63167524
Longitude : 87.22474528
file name : Image_22052024155003039.png
|
2024-05-22 15:50:03.176233 |
11 |
67996322 |
Creation of a new source of drinking water |
174600 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.64237848
Longitude : 87.24251387
file name : Image_16042024111901043.png
|
2024-04-16 11:19:01.135337 |
12 |
67996322 |
Creation of a new source of drinking water |
174600 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.6448801
Longitude : 87.2431438
file name : Image_12042024124053606.png
|
2024-04-12 12:40:53.701663 |
13 |
54521261 |
CONSTRUCTION OF PCC ROAD WITH DRAIN AT SANSAD XIV |
347446 |
CONSTRUCTION OF PCC ROAD WITH DRAIN AT SANSAD XIV1 |
Roof laid |
-
latitude : 23.6482603,23.6482603
Longitude : 87.2502501,87.2502501
file name : Image_10022022114718307.png
|
2022-02-10 11:47:18.411646 |
14 |
54521261 |
CONSTRUCTION OF PCC ROAD WITH DRAIN AT SANSAD XIV |
347446 |
CONSTRUCTION OF PCC ROAD WITH DRAIN AT SANSAD XIV1 |
Plinth level |
-
latitude : 23.6480826,23.6480826
Longitude : 87.2499978,87.2499978
file name : Image_09022022122220428.png
|
2022-02-09 12:22:20.519978 |
15 |
54534132 |
CONSTRUCTION OF DRAIN WITH CULVERT RAMAPADA MAHATO HOUSE TO SHYAMAL MUKHERJEE HOUSE AT SANSAD XV |
173024 |
CONSTRUCTION OF DRAIN WITH CULVERT RAMAPADA MAHATO HOUSE TO SHYAMAL MUKHERJEE HOUSE AT SANSAD XV1 |
Completion of work |
-
latitude : 23.6455302,23.6455302
Longitude : 87.250393,87.250393
file name : Image_17022022154012059.png
|
2022-02-17 15:40:12.395685 |
16 |
54534132 |
CONSTRUCTION OF DRAIN WITH CULVERT RAMAPADA MAHATO HOUSE TO SHYAMAL MUKHERJEE HOUSE AT SANSAD XV |
173024 |
CONSTRUCTION OF DRAIN WITH CULVERT RAMAPADA MAHATO HOUSE TO SHYAMAL MUKHERJEE HOUSE AT SANSAD XV1 |
Plinth level |
-
latitude : 23.6455462,23.6455462
Longitude : 87.2504033,87.2504033
file name : Image_17022022154523120.png
|
2022-02-17 15:45:23.228453 |
17 |
54534132 |
CONSTRUCTION OF DRAIN WITH CULVERT RAMAPADA MAHATO HOUSE TO SHYAMAL MUKHERJEE HOUSE AT SANSAD XV |
173024 |
CONSTRUCTION OF DRAIN WITH CULVERT RAMAPADA MAHATO HOUSE TO SHYAMAL MUKHERJEE HOUSE AT SANSAD XV1 |
Roof laid |
-
latitude : 23.6455161,23.6455161
Longitude : 87.2504222,87.2504222
file name : Image_02032022125415629.png
|
2022-03-02 12:54:15.750532 |
18 |
34423490 |
Construction of PCC Road from Gopal Dhak Shop |
174504 |
Construction of PCC Road from Gopal Dhak Shop 1 |
Roof laid |
-
latitude : 23.6520353,23.6520353
Longitude : 87.2419215,87.2419215
file name : Image_21122021143134617.png
|
2021-12-21 14:31:34.713647 |
19 |
34423490 |
Construction of PCC Road from Gopal Dhak Shop |
174504 |
Construction of PCC Road from Gopal Dhak Shop 1 |
Roof laid |
-
latitude : 23.6520329,23.6520362
Longitude : 87.2419208,87.2419214
file name : Image_21122021143139392.png
|
2021-12-21 14:31:39.509827 |
20 |
34423490 |
Construction of PCC Road from Gopal Dhak Shop |
174504 |
Construction of PCC Road from Gopal Dhak Shop 1 |
Roof laid |
-
latitude : 23.6520353,23.6520353
Longitude : 87.2419215,87.2419215
file name : Image_21122021143142791.png
|
2021-12-21 14:31:42.907499 |
21 |
39053563 |
Construction of PCC road at Tarun Sangha club |
237282 |
Construction of PCC road at Tarun Sangha club1 |
Roof laid |
-
latitude : 23.6488234,23.6488234,23.6488234
Longitude : 87.2451163,87.2451163,87.2451163
file name : Image_06012022124808158.png
|
2022-01-06 12:48:08.294399 |
22 |
39053563 |
Construction of PCC road at Tarun Sangha club |
237282 |
Construction of PCC road at Tarun Sangha club1 |
Plinth level |
-
latitude : 23.648819,23.648819,23.648819
Longitude : 87.2451247,87.2451247,87.2451247
file name : Image_05012022150707160.png
|
2022-01-05 15:07:07.259131 |
23 |
34504633 |
Construction of Culture Stage at Das Para |
166571 |
Construction of Culture Stage at Das Para 1 |
Plinth level |
-
latitude : 23.6471817
Longitude : 87.2431526
file name : Image_17022022155633586.png
|
2022-02-17 15:56:33.709023 |
24 |
34504633 |
Construction of Culture Stage at Das Para |
166571 |
Construction of Culture Stage at Das Para 1 |
Roof laid |
-
latitude : 23.6471904
Longitude : 87.2432256
file name : Image_28022022152734318.png
|
2022-02-28 15:27:34.426212 |
25 |
39063308 |
Construction of Road from Sabuj samity |
348713 |
Construction of Road from Sabuj samity 1 |
Roof laid |
-
latitude : 23.6397372,23.6397369
Longitude : 87.24728173,87.24728183
file name : Image_11012022135500711.png
|
2022-01-11 13:55:00.807968 |
26 |
39063308 |
Construction of Road from Sabuj samity |
348713 |
Construction of Road from Sabuj samity 1 |
Plinth level |
-
latitude : 23.63981281,23.6397481
Longitude : 87.24718562,87.24732775
file name : Image_10012022172849124.png
|
2022-01-10 17:28:49.271488 |
27 |
39063308 |
Construction of Road from Sabuj samity |
348713 |
Construction of Road from Sabuj samity 1 |
Plinth level |
-
latitude : 23.63958647,23.63957631,23.63957261,23.63954474,23.63954306
Longitude : 87.24739634,87.24741982,87.24743055,87.24747737,87.24752157
file name : Image_10012022172222663.png
|
2022-01-10 17:22:22.945649 |
28 |
34417586 |
Construction of PCC Road from Gupta Market to Pujan Decorators |
117612 |
Construction of PCC Road from Gupta Market to Pujan Decorators1 |
Roof laid |
-
latitude : 23.6511667,23.6511667
Longitude : 87.2423346,87.2423346
file name : Image_11012022135822193.png
|
2022-01-11 13:58:22.293556 |
29 |
34417586 |
Construction of PCC Road from Gupta Market to Pujan Decorators |
117612 |
Construction of PCC Road from Gupta Market to Pujan Decorators1 |
Plinth level |
-
latitude : 23.6513507,23.6513242,23.6513242,23.6513506,23.6513506
Longitude : 87.2420769,87.2421191,87.2421191,87.2420887,87.2420887
file name : Image_10012022170828781.png
|
2022-01-10 17:08:28.89214 |
30 |
34417586 |
Construction of PCC Road from Gupta Market to Pujan Decorators |
117612 |
Construction of PCC Road from Gupta Market to Pujan Decorators1 |
Plinth level |
-
latitude : 23.6511282,23.6511282,23.6511282
Longitude : 87.2423592,87.2423592,87.2423592
file name : Image_06012022131346525.png
|
2022-01-06 13:13:46.636072 |
31 |
34396576 |
Repearing of Drain from Sanjoy Gorai House to Nilkhanta Chatterjee House |
108993 |
Repearing of Drain from Sanjoy Gorai House to Nilkhanta Chatterjee House 1 |
Roof laid |
-
latitude : 23.6525608,23.6525608
Longitude : 87.2448952,87.2448952
file name : Image_14012022132853534.png
|
2022-01-14 13:28:53.634612 |
32 |
34396576 |
Repearing of Drain from Sanjoy Gorai House to Nilkhanta Chatterjee House |
108993 |
Repearing of Drain from Sanjoy Gorai House to Nilkhanta Chatterjee House 1 |
Plinth level |
-
latitude : 23.65256333,23.65256333,23.6525006,23.6525006
Longitude : 87.24474638,87.24474638,87.2448425,87.2448425
file name : Image_13012022165853248.png
|
2022-01-13 16:58:53.350199 |
33 |
34396576 |
Repearing of Drain from Sanjoy Gorai House to Nilkhanta Chatterjee House |
108993 |
Repearing of Drain from Sanjoy Gorai House to Nilkhanta Chatterjee House 1 |
Plinth level |
-
latitude : 23.6537304,23.6526012,23.6526012
Longitude : 87.2399845,87.2447588,87.2447588
file name : Image_13012022165456028.png
|
2022-01-13 16:54:56.130341 |
34 |
39063430 |
Construction of PCC Road from Ananda bej house |
100572 |
Construction of PCC Road from Ananda bej house 1 |
Roof laid |
-
latitude : 23.64576541,23.64576443
Longitude : 87.24037653,87.24037602
file name : Image_14012022134653935.png
|
2022-01-14 13:46:54.049743 |
35 |
39063430 |
Construction of PCC Road from Ananda bej house |
100572 |
Construction of PCC Road from Ananda bej house 1 |
Plinth level |
-
latitude : 23.64595683,23.64595487
Longitude : 87.24044584,87.2404469
file name : Image_13012022172151829.png
|
2022-01-13 17:21:51.924334 |
36 |
54521833 |
CONSTRUCTION OF PCC ROAD FROM MD KHALI HOUSE TO AMJAD KHAN HOUSE AT SANSAD IX |
170881 |
CONSTRUCTION OF PCC ROAD FROM MD KHALI HOUSE TO AMJAD KHAN HOUSE AT SANSAD IX1 |
Roof laid |
-
latitude : 23.6539721,23.6539721
Longitude : 87.2418227,87.2418227
file name : Image_21012022143959783.png
|
2022-01-21 14:39:59.883653 |
37 |
54521833 |
CONSTRUCTION OF PCC ROAD FROM MD KHALI HOUSE TO AMJAD KHAN HOUSE AT SANSAD IX |
170881 |
CONSTRUCTION OF PCC ROAD FROM MD KHALI HOUSE TO AMJAD KHAN HOUSE AT SANSAD IX1 |
Plinth level |
-
latitude : 23.65100844,23.65100844,23.6539721
Longitude : 87.24372342,87.24372342,87.2418227
file name : Image_20012022172255121.png
|
2022-01-20 17:22:55.23247 |
38 |
34435587 |
Constructionof Ghat at Dome Gorey |
148163 |
Constructionof Ghat at Dome Gorey 1 |
Plinth level |
-
latitude : 23.64992905
Longitude : 87.24416112
file name : Image_22032022095736880.png
|
2022-03-22 09:57:36.990213 |
39 |
54534176 |
CONSTRUCTION OF CULVERT WITH DRAIN FROM SAJAL BURMAN HOUSE TO KB HIGH SCHOOL |
166555 |
CONSTRUCTION OF CULVERT WITH DRAIN FROM SAJAL BURMAN HOUSE TO KB HIGH SCHOOL1 |
Plinth level |
-
latitude : 23.6461027,23.6461027
Longitude : 87.242694,87.242694
file name : Image_29042022110732961.png
|
2022-04-29 11:07:33.053471 |
40 |
54534176 |
CONSTRUCTION OF CULVERT WITH DRAIN FROM SAJAL BURMAN HOUSE TO KB HIGH SCHOOL |
166555 |
CONSTRUCTION OF CULVERT WITH DRAIN FROM SAJAL BURMAN HOUSE TO KB HIGH SCHOOL1 |
Roof laid |
-
latitude : 23.6456765,23.6456765
Longitude : 87.2429915,87.2429915
file name : Image_04052022113827812.png
|
2022-05-04 11:38:27.94817 |
41 |
54534176 |
CONSTRUCTION OF CULVERT WITH DRAIN FROM SAJAL BURMAN HOUSE TO KB HIGH SCHOOL |
166555 |
CONSTRUCTION OF CULVERT WITH DRAIN FROM SAJAL BURMAN HOUSE TO KB HIGH SCHOOL1 |
Plinth level |
-
latitude : 23.6460188,23.6460188
Longitude : 87.2426205,87.2426205
file name : Image_03032022112039865.png
|
2022-03-03 11:20:39.96209 |
42 |
54534072 |
CONSTRUCTION OF NEW DRAIN SUKO POND TO BAGDI PARA AT SANSAD XX |
208274 |
CONSTRUCTION OF NEW DRAIN SUKO POND TO BAGDI PARA AT SANSAD XX1 |
Roof laid |
-
latitude : 23.64325016,23.64325016
Longitude : 87.24141605,87.24141605
file name : Image_05052022105404432.png
|
2022-05-05 10:54:04.575397 |
43 |
54534072 |
CONSTRUCTION OF NEW DRAIN SUKO POND TO BAGDI PARA AT SANSAD XX |
208274 |
CONSTRUCTION OF NEW DRAIN SUKO POND TO BAGDI PARA AT SANSAD XX1 |
Plinth level |
-
latitude : 23.64331533,23.64331533
Longitude : 87.24160819,87.24160819
file name : Image_21032022105124826.png
|
2022-03-21 10:51:24.943194 |
44 |
39074133 |
Construction of Boundary Wall at SSK Centre |
159163 |
Construction of Boundary Wall at SSK Centre1 |
Plinth level |
-
latitude : 23.6469035
Longitude : 87.2580199
file name : Image_22032022105958245.png
|
2022-03-22 10:59:58.36556 |
45 |
34481314 |
Construction of Womens Room at Boxipukur Ghat |
100000 |
Construction of Womens Room at Boxipukur Ghat1 |
Roof laid |
-
latitude : 23.64517789
Longitude : 87.24763451
file name : Image_09062022102821151.png
|
2022-06-09 10:28:21.243073 |
46 |
34481314 |
Construction of Womens Room at Boxipukur Ghat |
100000 |
Construction of Womens Room at Boxipukur Ghat1 |
Plinth level |
-
latitude : 23.6457011
Longitude : 87.2476438
file name : Image_22032022100154465.png
|
2022-03-22 10:01:54.610547 |
47 |
48503251 |
WATER PIPE LINE REPAIRING AND DRAIN CLEANING AND GARBAGE CLEANING AT GP AREA |
533445 |
WATER PIPE LINE REPAIRING AND DRAIN CLEANING AND GARBAGE CLEANING AT GP AREA1 |
Roof laid |
-
latitude : 23.64948771,23.64948771
Longitude : 87.24708439,87.24708439
file name : Image_16112022152526299.png
|
2022-11-16 15:25:26.392442 |
48 |
48503251 |
WATER PIPE LINE REPAIRING AND DRAIN CLEANING AND GARBAGE CLEANING AT GP AREA |
533445 |
WATER PIPE LINE REPAIRING AND DRAIN CLEANING AND GARBAGE CLEANING AT GP AREA1 |
Plinth level |
-
latitude : 23.65006216,23.65006216
Longitude : 87.24855676,87.24855676
file name : Image_22082022124030177.png
|
2022-08-22 12:40:30.279402 |
49 |
48503251 |
WATER PIPE LINE REPAIRING AND DRAIN CLEANING AND GARBAGE CLEANING AT GP AREA |
533445 |
WATER PIPE LINE REPAIRING AND DRAIN CLEANING AND GARBAGE CLEANING AT GP AREA1 |
Plinth level |
-
latitude : 23.64713975,23.64713975
Longitude : 87.24629441,87.24629441
file name : Image_22082022124409911.png
|
2022-08-22 12:44:10.021957 |
50 |
48503251 |
WATER PIPE LINE REPAIRING AND DRAIN CLEANING AND GARBAGE CLEANING AT GP AREA |
533445 |
WATER PIPE LINE REPAIRING AND DRAIN CLEANING AND GARBAGE CLEANING AT GP AREA1 |
Plinth level |
-
latitude : 23.6527203,23.6527203
Longitude : 87.2407219,87.2407219
file name : Image_04082022111858471.png
|
2022-08-04 11:18:58.585782 |
51 |
48503251 |
WATER PIPE LINE REPAIRING AND DRAIN CLEANING AND GARBAGE CLEANING AT GP AREA |
533445 |
WATER PIPE LINE REPAIRING AND DRAIN CLEANING AND GARBAGE CLEANING AT GP AREA1 |
Plinth level |
-
latitude : 23.65271,23.65271
Longitude : 87.241031,87.241031
file name : Image_04082022111948968.png
|
2022-08-04 11:19:49.063718 |
52 |
48503251 |
WATER PIPE LINE REPAIRING AND DRAIN CLEANING AND GARBAGE CLEANING AT GP AREA |
533445 |
WATER PIPE LINE REPAIRING AND DRAIN CLEANING AND GARBAGE CLEANING AT GP AREA1 |
Roof laid |
-
latitude : 23.64951808,23.64953222
Longitude : 87.24705738,87.2470711
file name : Image_16112022152636254.png
|
2022-11-16 15:26:36.367907 |
53 |
48434945 |
Construction of pcc road from Jayram shop bhagaban Das shop to Durga mandir |
262863 |
Construction of pcc road from Jayram shop bhagaban Das shop to Durga mandir1 |
Roof laid |
-
latitude : 23.6491892,23.6491892
Longitude : 87.2583209,87.2583209
file name : Image_23112022115651237.png
|
2022-11-23 11:56:51.351258 |
54 |
48434945 |
Construction of pcc road from Jayram shop bhagaban Das shop to Durga mandir |
262863 |
Construction of pcc road from Jayram shop bhagaban Das shop to Durga mandir1 |
Roof laid |
-
latitude : 23.6480709,23.6480709
Longitude : 87.2580497,87.2580497
file name : Image_23112022115809768.png
|
2022-11-23 11:58:09.89315 |
55 |
48441392 |
MODIFICATION OF ATHCHALA NEAR NARAGOSAIN MANDIR |
257690 |
MODIFICATION OF ATHCHALA NEAR NARAGOSAIN MANDIR1 |
Roof laid |
-
latitude : 23.64435246
Longitude : 87.24407215
file name : Image_11012023151812877.png
|
2023-01-11 15:18:12.96038 |
56 |
34506841 |
Repairing of Guljarbagh Urdu F.P. SCHOOL |
119292 |
Repairing of Guljarbagh Urdu F.P. SCHOOL1 |
Plinth level |
-
latitude : 23.6540022
Longitude : 87.2403754
file name : Image_20012023152302961.png
|
2023-01-20 15:23:03.04151 |
57 |
34506841 |
Repairing of Guljarbagh Urdu F.P. SCHOOL |
119292 |
Repairing of Guljarbagh Urdu F.P. SCHOOL1 |
Roof laid |
-
latitude : 23.6544527
Longitude : 87.24022242
file name : Image_20012023153653292.png
|
2023-01-20 15:36:53.398976 |
58 |
48440939 |
CONSTRUCTION OF CULTURAL STAGE NEAR MUKHERJEE PARA DURGA MANDIR |
144873 |
CONSTRUCTION OF CULTURAL STAGE NEAR MUKHERJEE PARA DURGA MANDIR1 |
Roof laid |
-
latitude : 23.644919
Longitude : 87.2451549
file name : Image_27012023090037497.png
|
2023-01-27 09:00:37.604473 |
59 |
48367959 |
CONSTRUCTION OF PCC ROAD FROM SHANKAR DAS HOUSE TO CHANDAN DAWN HOUSE,SAMSAD VIII |
338647 |
CONSTRUCTION OF PCC ROAD FROM SHANKAR DAS HOUSE TO CHANDAN DAWN HOUSE,SAMSAD VIII1 |
Roof laid |
-
latitude : 23.652916,23.652916
Longitude : 87.2439768,87.2439768
file name : Image_27012023120854632.png
|
2023-01-27 12:08:54.722184 |
60 |
54534086 |
CONSTRUCTION OF DRAIN FROM KHAJA MUKHERJEE HOUSE TO LIC GATE AT SANSAD V |
155000 |
CONSTRUCTION OF DRAIN FROM KHAJA MUKHERJEE HOUSE TO LIC GATE AT SANSAD V1 |
Roof laid |
-
latitude : 23.651609,23.651609
Longitude : 87.2426106,87.2426106
file name : Image_19052022154047165.png
|
2022-05-19 15:40:47.268142 |
61 |
54534086 |
CONSTRUCTION OF DRAIN FROM KHAJA MUKHERJEE HOUSE TO LIC GATE AT SANSAD V |
155000 |
CONSTRUCTION OF DRAIN FROM KHAJA MUKHERJEE HOUSE TO LIC GATE AT SANSAD V1 |
Plinth level |
-
latitude : 23.6522361,23.6522361
Longitude : 87.2431156,87.2431156
file name : Image_03032022113201573.png
|
2022-03-03 11:32:01.679082 |
62 |
54534032 |
CONSTRUCTION OF PCC ROAD FROM PUSHPEN SAHA HOUSE TO GOPI SARKAR HOUSE |
214602 |
CONSTRUCTION OF PCC ROAD FROM PUSHPEN SAHA HOUSE TO GOPI SARKAR HOUSE1 |
Roof laid |
-
latitude : 23.6504708,23.6504723
Longitude : 87.2426909,87.2426907
file name : Image_10022022170308530.png
|
2022-02-10 17:03:08.630646 |
63 |
54534032 |
CONSTRUCTION OF PCC ROAD FROM PUSHPEN SAHA HOUSE TO GOPI SARKAR HOUSE |
214602 |
CONSTRUCTION OF PCC ROAD FROM PUSHPEN SAHA HOUSE TO GOPI SARKAR HOUSE1 |
Plinth level |
-
latitude : 23.6506844,23.6506844
Longitude : 87.2423034,87.2423034
file name : Image_01022022124517074.png
|
2022-02-01 12:45:17.209227 |
64 |
54534149 |
CONSTRUCTION OF DRAIN ISTIYAK HOUSE TO RAHIM HOUSE WITH SLAB AT SANSAD XXII |
206281 |
CONSTRUCTION OF DRAIN ISTIYAK HOUSE TO RAHIM HOUSE WITH SLAB AT SANSAD XXII1 |
Roof laid |
-
latitude : 23.6561718,23.65617407
Longitude : 87.23458313,87.23458496
file name : Image_10022022171913829.png
|
2022-02-10 17:19:13.904747 |
65 |
54534149 |
CONSTRUCTION OF DRAIN ISTIYAK HOUSE TO RAHIM HOUSE WITH SLAB AT SANSAD XXII |
206281 |
CONSTRUCTION OF DRAIN ISTIYAK HOUSE TO RAHIM HOUSE WITH SLAB AT SANSAD XXII1 |
Plinth level |
-
latitude : 23.65615189,23.65615189
Longitude : 87.2345757,87.2345757
file name : Image_01022022115608703.png
|
2022-02-01 11:56:08.84333 |
66 |
54534149 |
CONSTRUCTION OF DRAIN ISTIYAK HOUSE TO RAHIM HOUSE WITH SLAB AT SANSAD XXII |
206281 |
CONSTRUCTION OF DRAIN ISTIYAK HOUSE TO RAHIM HOUSE WITH SLAB AT SANSAD XXII1 |
Plinth level |
-
latitude : 23.65618034,23.65618034
Longitude : 87.23458158,87.23458158
file name : Image_01022022115641857.png
|
2022-02-01 11:56:41.971876 |
67 |
34439401 |
Construction of Pucca Drain from Bisu Ruidas House |
246982 |
Construction of Pucca Drain from Bisu Ruidas House 1 |
Roof laid |
-
latitude : 23.64643593,23.64643427
Longitude : 87.25821749,87.25821965
file name : Image_15092021145054896.png
|
2021-09-15 14:50:55.022892 |
68 |
34487431 |
Construction of PCC Road from Tili Para Main Drain |
235312 |
Construction of PCC Road from Tili Para Main Drain 1 |
Roof laid |
-
latitude : 23.65376076,23.65376076
Longitude : 87.24000381,87.24000381
file name : Image_15092021161029746.png
|
2021-09-15 16:10:29.837472 |
69 |
34490025 |
Construction of PCC Road at 3no FP SCHOOL |
100572 |
Construction of PCC Road at 3no FP SCHOOL1 |
Roof laid |
-
latitude : 23.64174939,23.64174968,23.64174968
Longitude : 87.24465408,87.24465233,87.24465233
file name : Image_28122021113632721.png
|
2021-12-28 11:36:32.866231 |
70 |
39043313 |
Construction of Pucca drain from Bijoy Burnwal house |
245456 |
Construction of Pucca drain from Bijoy Burnwal house 1 |
Roof laid |
-
latitude : 23.6498248,23.6498248,23.6498248
Longitude : 87.2402536,87.2402536,87.2402536
file name : Image_31122021130534604.png
|
2021-12-31 13:05:34.726775 |
71 |
39043313 |
Construction of Pucca drain from Bijoy Burnwal house |
245456 |
Construction of Pucca drain from Bijoy Burnwal house 1 |
Plinth level |
-
latitude : 23.64921382,23.64921191,23.64921191
Longitude : 87.23992394,87.23992396,87.23992396
file name : Image_21122021155538288.png
|
2021-12-21 15:55:38.437814 |
72 |
39043313 |
Construction of Pucca drain from Bijoy Burnwal house |
245456 |
Construction of Pucca drain from Bijoy Burnwal house 1 |
Completion of work |
-
latitude : 23.6497799,23.6497799,23.6497799
Longitude : 87.2403197,87.2403197,87.2403197
file name : Image_21122021143725325.png
|
2021-12-21 14:37:25.450649 |
73 |
34507169 |
Construction of Drain with Slab from Suraj Shop |
266988 |
Construction of Drain with Slab from Suraj Shop 1 |
Roof laid |
-
latitude : 23.6539007,23.6539007,23.6539007
Longitude : 87.2408851,87.2408851,87.2408851
file name : Image_13012022124252916.png
|
2022-01-13 12:42:53.050646 |
74 |
34507169 |
Construction of Drain with Slab from Suraj Shop |
266988 |
Construction of Drain with Slab from Suraj Shop 1 |
Plinth level |
-
latitude : 23.653914,23.653914
Longitude : 87.2408829,87.2408829
file name : Image_11012022163526727.png
|
2022-01-11 16:35:26.837622 |
75 |
34507169 |
Construction of Drain with Slab from Suraj Shop |
266988 |
Construction of Drain with Slab from Suraj Shop 1 |
Plinth level |
-
latitude : 23.6539136,23.6539136,23.6539114
Longitude : 87.2408752,87.2408752,87.2408767
file name : Image_11012022163313926.png
|
2022-01-11 16:33:14.049928 |
76 |
39056220 |
Construction of new well near Late Usuf Ansari house |
212911 |
Construction of new well near Late Usuf Ansari house1 |
Roof laid |
-
latitude : 23.6547255
Longitude : 87.2437581
file name : Image_28042022171319300.png
|
2022-04-28 17:13:19.393397 |
77 |
54534214 |
CONSTRUCTION OF BOUNDARY WALL AT BISWALAKKHI TALA ICDS CENTRE |
164173 |
CONSTRUCTION OF BOUNDARY WALL AT BISWALAKKHI TALA ICDS CENTRE 1 |
Roof laid |
-
latitude : 23.65037404
Longitude : 87.24695596
file name : Image_16112022151922484.png
|
2022-11-16 15:19:22.582052 |
78 |
54534214 |
CONSTRUCTION OF BOUNDARY WALL AT BISWALAKKHI TALA ICDS CENTRE |
164173 |
CONSTRUCTION OF BOUNDARY WALL AT BISWALAKKHI TALA ICDS CENTRE 1 |
Roof laid |
-
latitude : 23.65040455
Longitude : 87.24696607
file name : Image_16112022152047895.png
|
2022-11-16 15:20:47.98763 |
79 |
54534315 |
Const of well at khosla babaji para |
230000 |
Const of well at khosla babaji para1 |
Roof laid |
-
latitude : 23.63424397
Longitude : 87.2468823
file name : Image_31072023173113842.png
|
2023-07-31 17:31:13.949001 |
80 |
54534315 |
Const of well at khosla babaji para |
230000 |
Const of well at khosla babaji para1 |
Plinth level |
-
latitude : 23.63423984
Longitude : 87.24691272
file name : Image_31072023114238795.png
|
2023-07-31 11:42:38.909333 |
81 |
54534315 |
Const of well at khosla babaji para |
230000 |
Const of well at khosla babaji para1 |
Completion of work |
-
latitude : 23.64336584
Longitude : 87.24160317
file name : Image_25072023111247785.png
|
2023-07-25 11:12:47.899091 |
82 |
48375102 |
CONSTRUCTION OF PCC ROAD FROM MAIN ROAD TO SSK CENTRE,SAMSAD X |
182000 |
CONSTRUCTION OF PCC ROAD FROM MAIN ROAD TO SSK CENTRE,SAMSAD X1 |
Roof laid |
-
latitude : 23.6468591,23.6468591
Longitude : 87.2579851,87.2579851
file name : Image_06062023165007134.png
|
2023-06-06 16:50:07.222426 |
83 |
54534170 |
CONSTRUCTION OF DRAIN FROM HO KALI CHARAN TO MUKHERJEE PARA MAIN ROAD AT SANSAD XVI |
211000 |
CONSTRUCTION OF DRAIN FROM HO KALI CHARAN TO MUKHERJEE PARA MAIN ROAD AT SANSAD XVI1 |
Plinth level |
-
latitude : 23.6444081,23.6444081
Longitude : 87.2460991,87.2460991
file name : Image_02032022124308967.png
|
2022-03-02 12:43:09.067958 |
84 |
54534170 |
CONSTRUCTION OF DRAIN FROM HO KALI CHARAN TO MUKHERJEE PARA MAIN ROAD AT SANSAD XVI |
211000 |
CONSTRUCTION OF DRAIN FROM HO KALI CHARAN TO MUKHERJEE PARA MAIN ROAD AT SANSAD XVI1 |
Roof laid |
-
latitude : 23.6442589,23.6442589
Longitude : 87.2460372,87.2460372
file name : Image_09032022142524576.png
|
2022-03-09 14:25:24.658535 |
85 |
48441666 |
CONSTRUCTION OF WELL NEAR JAMAI PARA ICDS CENTRE |
230000 |
CONSTRUCTION OF WELL NEAR JAMAI PARA ICDS CENTRE1 |
Roof laid |
-
latitude : 23.639754
Longitude : 87.24630935
file name : Image_08082023153338122.png
|
2023-08-08 15:33:38.278397 |
86 |
48441666 |
CONSTRUCTION OF WELL NEAR JAMAI PARA ICDS CENTRE |
230000 |
CONSTRUCTION OF WELL NEAR JAMAI PARA ICDS CENTRE1 |
Plinth level |
-
latitude : 23.63971946
Longitude : 87.24630967
file name : Image_08082023152802037.png
|
2023-08-08 15:28:02.124536 |
87 |
48441666 |
CONSTRUCTION OF WELL NEAR JAMAI PARA ICDS CENTRE |
230000 |
CONSTRUCTION OF WELL NEAR JAMAI PARA ICDS CENTRE1 |
Completion of work |
-
latitude : 23.65379431
Longitude : 87.23990984
file name : Image_08082023152304274.png
|
2023-08-08 15:23:04.458513 |
88 |
58265626 |
Construction of pcc road from minibus stand to Bidyut Gorai house |
146600 |
Construction of pcc road from minibus stand to Bidyut Gorai house1 |
Roof laid |
-
latitude : 23.649035,23.649035
Longitude : 87.2514853,87.2514853
file name : Image_28022023124549920.png
|
2023-02-28 12:45:50.026906 |
89 |
47919920 |
CONSTRUCTION OF PCC ROAD FROM PAGLA GHOSH TO PURNIMA BADYAKAR HOUSE WITH A SOCKPIT |
200000 |
CONSTRUCTION OF PCC ROAD FROM PAGLA GHOSH TO PURNIMA BADYAKAR HOUSE WITH A SOCKPIT1 |
Roof laid |
-
latitude : 23.6487155,23.6487155
Longitude : 87.24503928,87.24503928
file name : Image_01032023145524719.png
|
2023-03-01 14:55:24.812723 |
90 |
66485403 |
Greywater management system |
174758 |
Greywater management system1 |
Roof laid |
-
latitude : 23.64989614,23.64989614
Longitude : 87.25581468,87.25581468
file name : Image_29032023163941959.png
|
2023-03-29 16:39:42.073189 |
91 |
39059597 |
Const of massonary well at PRAGATI SANGHA CLUB |
111957 |
Const of massonary well at PRAGATI SANGHA CLUB 1 |
Roof laid |
-
latitude : 23.6456048
Longitude : 87.2426641
file name : Image_11072022160640610.png
|
2022-07-11 16:06:40.6994 |
92 |
39059597 |
Const of massonary well at PRAGATI SANGHA CLUB |
111957 |
Const of massonary well at PRAGATI SANGHA CLUB 1 |
Plinth level |
-
latitude : 23.6450247
Longitude : 87.2426601
file name : Image_08062022122743057.png
|
2022-06-08 12:27:43.171453 |
93 |
58142656 |
Cionstruction of pcc road from Madhu Ankure house to Milan Ruidads house |
136778 |
Cionstruction of pcc road from Madhu Ankure house to Milan Ruidads house1 |
Roof laid |
-
latitude : 23.6522227,23.6522227
Longitude : 87.24829232,87.24829232
file name : Image_16052023154926084.png
|
2023-05-16 15:49:26.180713 |
94 |
58394282 |
Construction of pcc road at Jamai para |
100388 |
Construction of pcc road at Jamai para 1 |
Roof laid |
-
latitude : 23.64332501,23.64332501
Longitude : 87.24195738,87.24195738
file name : Image_12042023114217656.png
|
2023-04-12 11:42:17.81101 |
95 |
47918606 |
CONSTRUCTION OF PCC ROAD FROM SK ANWAR HOUSE TO BABLU KHAN HOUSE, SAMSAD I |
67324 |
CONSTRUCTION OF PCC ROAD FROM SK ANWAR HOUSE TO BABLU KHAN HOUSE, SAMSAD I1 |
Roof laid |
-
latitude : 23.6519699,23.6519699
Longitude : 87.2445796,87.2445796
file name : Image_12042023120649724.png
|
2023-04-12 12:06:49.847287 |
96 |
58278180 |
Construction of pucca drain from Manasa Mandir to Jhulan Roy house |
168000 |
Construction of pucca drain from Manasa Mandir to Jhulan Roy house1 |
Roof laid |
-
latitude : 23.6472505,23.6472505
Longitude : 87.2448847,87.2448847
file name : Image_26042023143815075.png
|
2023-04-26 14:38:15.177769 |
97 |
34421753 |
construction of Dustbin and Women Protected Place |
170881 |
construction of Dustbin and Women Protected Place 1 |
Plinth level |
-
latitude : 23.65040696
Longitude : 87.23982446
file name : Image_17022022155730073.png
|
2022-02-17 15:57:30.190546 |
98 |
64853922 |
CONSTRUCTION OF CULTURAL STAGE NEAR MUKHERJEE PARA AT UKHRA VILLAGE |
343576 |
CONSTRUCTION OF CULTURAL STAGE NEAR MUKHERJEE PARA AT UKHRA VILLAGE1 |
Roof laid |
-
latitude : 23.6449132
Longitude : 87.2450432
file name : Image_16052023155748305.png
|
2023-05-16 15:57:48.396198 |
99 |
64853954 |
CONSTRUCTION OF BOUL MANCHA AT DASPARA UKHRA VILAGE |
350000 |
CONSTRUCTION OF BOUL MANCHA AT DASPARA UKHRA VILAGE1 |
Roof laid |
-
latitude : 23.6475346
Longitude : 87.2433844
file name : Image_13052023174328288.png
|
2023-05-13 17:43:28.401585 |
100 |
64853954 |
CONSTRUCTION OF BOUL MANCHA AT DASPARA UKHRA VILAGE |
350000 |
CONSTRUCTION OF BOUL MANCHA AT DASPARA UKHRA VILAGE1 |
Plinth level |
-
latitude : 23.6474963
Longitude : 87.243301
file name : Image_02022023172233197.png
|
2023-02-02 17:22:33.286662 |
101 |
48437744 |
CONSTRUCTION OF PCC ROAD FROM UTTAM CHATTERJEE HOUSE TO PALTU MUKHERJEE HOUSE |
244460 |
CONSTRUCTION OF PCC ROAD FROM UTTAM CHATTERJEE HOUSE TO PALTU MUKHERJEE HOUSE1 |
Roof laid |
-
latitude : 23.64428454,23.64426208
Longitude : 87.24502494,87.24497698
file name : Image_16112022145942268.png
|
2022-11-16 14:59:42.393948 |
102 |
48437744 |
CONSTRUCTION OF PCC ROAD FROM UTTAM CHATTERJEE HOUSE TO PALTU MUKHERJEE HOUSE |
244460 |
CONSTRUCTION OF PCC ROAD FROM UTTAM CHATTERJEE HOUSE TO PALTU MUKHERJEE HOUSE1 |
Roof laid |
-
latitude : 23.64428152,23.64428152
Longitude : 87.2449922,87.2449922
file name : Image_16112022150023227.png
|
2022-11-16 15:00:23.3336 |
103 |
48116090 |
CONSTRUCTION OF PCC ROAD FROM JWELLERY SHOP TO SIDE ROAD UPTO NC DAWN SHOP,SAMSAD IV |
218774 |
CONSTRUCTION OF PCC ROAD FROM JWELLERY SHOP TO SIDE ROAD UPTO NC DAWN SHOP,SAMSAD IV1 |
Roof laid |
-
latitude : 23.6524485,23.6524485
Longitude : 87.2402172,87.2402172
file name : Image_02092022143314086.png
|
2022-09-02 14:33:14.201252 |
104 |
48116090 |
CONSTRUCTION OF PCC ROAD FROM JWELLERY SHOP TO SIDE ROAD UPTO NC DAWN SHOP,SAMSAD IV |
218774 |
CONSTRUCTION OF PCC ROAD FROM JWELLERY SHOP TO SIDE ROAD UPTO NC DAWN SHOP,SAMSAD IV1 |
Plinth level |
-
latitude : 23.6525343,23.6525343
Longitude : 87.2399888,87.2399888
file name : Image_22082022120901262.png
|
2022-08-22 12:09:01.358431 |
105 |
48367353 |
CONSTRUCTION OF PUCCA DRAIN FROM DHIBAR PARA DURGA MANDIR TO MANIK DUTTA HOUSE |
140875 |
CONSTRUCTION OF PUCCA DRAIN FROM DHIBAR PARA DURGA MANDIR TO MANIK DUTTA HOUSE1 |
Roof laid |
-
latitude : 23.64586559,23.6458649
Longitude : 87.24409432,87.24409401
file name : Image_16112022150936235.png
|
2022-11-16 15:09:36.322636 |
106 |
48367353 |
CONSTRUCTION OF PUCCA DRAIN FROM DHIBAR PARA DURGA MANDIR TO MANIK DUTTA HOUSE |
140875 |
CONSTRUCTION OF PUCCA DRAIN FROM DHIBAR PARA DURGA MANDIR TO MANIK DUTTA HOUSE1 |
Roof laid |
-
latitude : 23.6458828,23.64588376
Longitude : 87.244094,87.24409387
file name : Image_16112022151020854.png
|
2022-11-16 15:10:20.947825 |
107 |
48436323 |
CONSTRUCTION OF PCC ROAD FROM SANNYASI KARMAKAR HOUSE TO JIBAN ADHIKARI HOUSE |
209742 |
CONSTRUCTION OF PCC ROAD FROM SANNYASI KARMAKAR HOUSE TO JIBAN ADHIKARI HOUSE1 |
Roof laid |
-
latitude : 23.646834,23.646834
Longitude : 87.2487518,87.2487518
file name : Image_24112022114035924.png
|
2022-11-24 11:40:36.032828 |
108 |
48436323 |
CONSTRUCTION OF PCC ROAD FROM SANNYASI KARMAKAR HOUSE TO JIBAN ADHIKARI HOUSE |
209742 |
CONSTRUCTION OF PCC ROAD FROM SANNYASI KARMAKAR HOUSE TO JIBAN ADHIKARI HOUSE1 |
Roof laid |
-
latitude : 23.6458794,23.6458794
Longitude : 87.2492266,87.2492266
file name : Image_23112022121211360.png
|
2022-11-23 12:12:11.44826 |
109 |
48115206 |
CONSTRUCTION OF PCC ROAD FROM MANIK GOSWAMI HOUSE TO HEMGOPAL ROY HOUSE,SAMSAD III |
204413 |
CONSTRUCTION OF PCC ROAD FROM MANIK GOSWAMI HOUSE TO HEMGOPAL ROY HOUSE,SAMSAD III1 |
Roof laid |
-
latitude : 23.6494863,23.6494863
Longitude : 87.2420242,87.2420242
file name : Image_02092022142817627.png
|
2022-09-02 14:28:17.722935 |
110 |
48115206 |
CONSTRUCTION OF PCC ROAD FROM MANIK GOSWAMI HOUSE TO HEMGOPAL ROY HOUSE,SAMSAD III |
204413 |
CONSTRUCTION OF PCC ROAD FROM MANIK GOSWAMI HOUSE TO HEMGOPAL ROY HOUSE,SAMSAD III1 |
Plinth level |
-
latitude : 23.6495126,23.6495126
Longitude : 87.2421001,87.2421001
file name : Image_22082022121827252.png
|
2022-08-22 12:18:27.354126 |
111 |
48502402 |
CONSTRUCTION OF PCC ROAD FROM SAMIM HOUSE TO ICDS CENTRE VIA KARISHMA HOUSE |
198902 |
CONSTRUCTION OF PCC ROAD FROM SAMIM HOUSE TO ICDS CENTRE VIA KARISHMA HOUSE1 |
Roof laid |
-
latitude : 23.6563647,23.6563647
Longitude : 87.2386453,87.2386453
file name : Image_31082022104859626.png
|
2022-08-31 10:48:59.733008 |
112 |
48502402 |
CONSTRUCTION OF PCC ROAD FROM SAMIM HOUSE TO ICDS CENTRE VIA KARISHMA HOUSE |
198902 |
CONSTRUCTION OF PCC ROAD FROM SAMIM HOUSE TO ICDS CENTRE VIA KARISHMA HOUSE1 |
Plinth level |
-
latitude : 23.65590792,23.65590792
Longitude : 87.23526124,87.23526124
file name : Image_23082022121548087.png
|
2022-08-23 12:15:48.199252 |
113 |
58410873 |
Construction of pucca drain with bathroom at Shib Gorey including water pipeline work |
208000 |
Construction of pucca drain with bathroom at Shib Gorey including water pipeline work1 |
Roof laid |
-
latitude : 23.6475305,23.6475305
Longitude : 87.2433476,87.2433476
file name : Image_09052023094851630.png
|
2023-05-09 09:48:51.728453 |
114 |
48442322 |
CONSTRUCTION OF PCC ROAD FROM ANANDA BEJ HOUSE TO GOKUL PUKUR |
229876 |
CONSTRUCTION OF PCC ROAD FROM ANANDA BEJ HOUSE TO GOKUL PUKUR1 |
Plinth level |
-
latitude : 23.64359442,23.64359442,23.64359442
Longitude : 87.24149278,87.24149278,87.24149278
file name : Image_02122022164438510.png
|
2022-12-02 16:44:38.601432 |
115 |
48442322 |
CONSTRUCTION OF PCC ROAD FROM ANANDA BEJ HOUSE TO GOKUL PUKUR |
229876 |
CONSTRUCTION OF PCC ROAD FROM ANANDA BEJ HOUSE TO GOKUL PUKUR1 |
Roof laid |
-
latitude : 23.64542599,23.64542599
Longitude : 87.24018859,87.24018859
file name : Image_19122022150623906.png
|
2022-12-19 15:06:24.005814 |
116 |
47919372 |
CONSTRUCTION OF PCC ROAD FROM SISHU SIKSHA KENDRA TO KALIMANDIR, SAMSAD II |
249287 |
CONSTRUCTION OF PCC ROAD FROM SISHU SIKSHA KENDRA TO KALIMANDIR, SAMSAD II1 |
Roof laid |
-
latitude : 23.6511435,23.6511435
Longitude : 87.2467804,87.2467804
file name : Image_01092022114404426.png
|
2022-09-01 11:44:04.53904 |
117 |
47919372 |
CONSTRUCTION OF PCC ROAD FROM SISHU SIKSHA KENDRA TO KALIMANDIR, SAMSAD II |
249287 |
CONSTRUCTION OF PCC ROAD FROM SISHU SIKSHA KENDRA TO KALIMANDIR, SAMSAD II1 |
Roof laid |
-
latitude : 23.6511613,23.6511613
Longitude : 87.2468319,87.2468319
file name : Image_22082022122555198.png
|
2022-08-22 12:25:55.293774 |
118 |
54533956 |
CONSTRUCTION OF PCC ROAD FROM JOY NARAYAN KOLE HOUSE TO MADRASA AT SANSAD XII |
192169 |
CONSTRUCTION OF PCC ROAD FROM JOY NARAYAN KOLE HOUSE TO MADRASA AT SANSAD XII1 |
Roof laid |
-
latitude : 23.6513259,23.6513259,23.6513259
Longitude : 87.2570691,87.2570691,87.2570691
file name : Image_06012022130431016.png
|
2022-01-06 13:04:31.122363 |
119 |
54521883 |
CONSTRUCTION OF PCC ROAD FROM DIPU SINGH HOUSE TO KHATAL AT SANSAD X |
176381 |
CONSTRUCTION OF PCC ROAD FROM DIPU SINGH HOUSE TO KHATAL AT SANSAD X1 |
Roof laid |
-
latitude : 23.6473718,23.6473718
Longitude : 87.2562442,87.2562442
file name : Image_21012022160933681.png
|
2022-01-21 16:09:33.779459 |
120 |
54521883 |
CONSTRUCTION OF PCC ROAD FROM DIPU SINGH HOUSE TO KHATAL AT SANSAD X |
176381 |
CONSTRUCTION OF PCC ROAD FROM DIPU SINGH HOUSE TO KHATAL AT SANSAD X1 |
Plinth level |
-
latitude : 23.6473745,23.6473745
Longitude : 87.2562516,87.2562516
file name : Image_20012022172410298.png
|
2022-01-20 17:24:10.408322 |
121 |
48442517 |
DRIAN REPAIRING WITH SLAB FROM SURAJ SHOP FACTORY TO ISHAQUE HOTEL |
294199 |
DRIAN REPAIRING WITH SLAB FROM SURAJ SHOP FACTORY TO ISHAQUE HOTEL1 |
Plinth level |
-
latitude : 23.65396155
Longitude : 87.24083878
file name : Image_26052023101054391.png
|
2023-05-26 10:10:54.480242 |
122 |
58278717 |
Construction of pcc road from Fulchand Ruidas house to Pankaj lal house |
134000 |
Construction of pcc road from Fulchand Ruidas house to Pankaj lal house 1 |
Roof laid |
-
latitude : 23.64620343,23.64620343
Longitude : 87.25124099,87.25124099
file name : Image_17052023134349517.png
|
2023-05-17 13:43:49.617873 |
123 |
48115472 |
CONSTRUCTION OF ADJACENT WHOLE CHATAL NEAR WATER RESERVER AT HANUMANDANGA,SAMSAD IV |
298489 |
CONSTRUCTION OF ADJACENT WHOLE CHATAL NEAR WATER RESERVER AT HANUMANDANGA,SAMSAD IV1 |
Plinth level |
-
latitude : 23.6502102
Longitude : 87.2398319
file name : Image_26052023101402707.png
|
2023-05-26 10:14:02.797381 |
124 |
58263465 |
Construction of pcc road from Das Dhawra ICDS center to math |
103000 |
Construction of pcc road from Das Dhawra ICDS center to math1 |
Roof laid |
-
latitude : 23.6468032,23.6468032
Longitude : 87.2564422,87.2564422
file name : Image_06062023165331429.png
|
2023-06-06 16:53:31.521745 |
125 |
58264138 |
Construction of pcc road from Shib Mandir to Rajashree Rajbhatr hlouse |
122300 |
Construction of pcc road from Shib Mandir to Rajashree Rajbhatr hlouse1 |
Roof laid |
-
latitude : 23.6476557,23.6476557
Longitude : 87.2551212,87.2551212
file name : Image_06062023165638081.png
|
2023-06-06 16:56:38.17261 |
126 |
58258459 |
Construction of shed for SHG activitiy near Moira para |
273000 |
Construction of shed for SHG activitiy near Moira para1 |
Roof laid |
-
latitude : 23.6457036
Longitude : 87.2452453
file name : Image_08062023165906274.png
|
2023-06-08 16:59:06.368641 |
127 |
58142473 |
Construction of well near Masjid at Shantipara |
251000 |
Construction of well near Masjid at Shantipara1 |
Roof laid |
-
latitude : 23.64342667
Longitude : 87.24163066
file name : Image_03072023171739460.png
|
2023-07-03 17:17:39.553854 |
128 |
58142597 |
Repairing of kitchen shed at Huchukpara SSK center including drinking water and pipeline work |
270000 |
Repairing of kitchen shed at Huchukpara SSK center including drinking water and pipeline work1 |
Roof laid |
-
latitude : 23.65366937,23.65366937
Longitude : 87.23995802,87.23995802
file name : Image_21072023170658597.png
|
2023-07-21 17:06:58.72365 |
129 |
58142597 |
Repairing of kitchen shed at Huchukpara SSK center including drinking water and pipeline work |
270000 |
Repairing of kitchen shed at Huchukpara SSK center including drinking water and pipeline work1 |
Plinth level |
-
latitude : 23.65179183,23.65178898
Longitude : 87.24694918,87.2469509
file name : Image_03072023172058156.png
|
2023-07-03 17:20:58.240839 |
130 |
58581035 |
Construction of pucca drain from Sajid house to Abid house including water pipeline work |
243000 |
Construction of pucca drain from Sajid house to Abid house including water pipeline work1 |
Roof laid |
-
latitude : 23.6566931,23.6566931
Longitude : 87.2341893,87.2341893
file name : Image_27072023160904086.png
|
2023-07-27 16:09:04.175551 |
131 |
58581035 |
Construction of pucca drain from Sajid house to Abid house including water pipeline work |
243000 |
Construction of pucca drain from Sajid house to Abid house including water pipeline work1 |
Plinth level |
-
latitude : 23.6556402,23.6556402
Longitude : 87.2385038,87.2385038
file name : Image_08062023164944849.png
|
2023-06-08 16:49:44.947955 |
132 |
58266601 |
Construction of pucca drain from Sou Mondal house to ECl Voska including water pipeline work |
188000 |
Construction of pucca drain from Sou Mondal house to ECl Voska including water pipeline work1 |
Roof laid |
-
latitude : 23.65238921,23.65238921
Longitude : 87.25390464,87.25390464
file name : Image_31072023172113390.png
|
2023-07-31 17:21:13.487705 |
133 |
58266601 |
Construction of pucca drain from Sou Mondal house to ECl Voska including water pipeline work |
188000 |
Construction of pucca drain from Sou Mondal house to ECl Voska including water pipeline work1 |
Plinth level |
-
latitude : 23.65232351,23.65232351
Longitude : 87.25384045,87.25384045
file name : Image_26072023162013690.png
|
2023-07-26 16:20:13.783526 |
134 |
58266601 |
Construction of pucca drain from Sou Mondal house to ECl Voska including water pipeline work |
188000 |
Construction of pucca drain from Sou Mondal house to ECl Voska including water pipeline work1 |
Completion of work |
-
latitude : 23.65236736,23.65236736
Longitude : 87.25391476,87.25391476
file name : Image_25072023112239954.png
|
2023-07-25 11:22:40.063985 |
135 |
58359717 |
Construction of pcc road from Tofi Tribedi house to main road at village of samsad XVI |
155000 |
Construction of pcc road from Tofi Tribedi house to main road at village of samsad XVI1 |
Roof laid |
-
latitude : 23.645323,23.64532292
Longitude : 87.24594255,87.24594261
file name : Image_31072023172603743.png
|
2023-07-31 17:26:03.837154 |
136 |
58359717 |
Construction of pcc road from Tofi Tribedi house to main road at village of samsad XVI |
155000 |
Construction of pcc road from Tofi Tribedi house to main road at village of samsad XVI1 |
Plinth level |
-
latitude : 23.6461466,23.6461466
Longitude : 87.2455068,87.2455068
file name : Image_26072023162557781.png
|
2023-07-26 16:25:57.868995 |
137 |
58359717 |
Construction of pcc road from Tofi Tribedi house to main road at village of samsad XVI |
155000 |
Construction of pcc road from Tofi Tribedi house to main road at village of samsad XVI1 |
Completion of work |
-
latitude : 23.64533611,23.64533611
Longitude : 87.24597176,87.24597176
file name : Image_21072023171238402.png
|
2023-07-21 17:12:38.496328 |
138 |
58412882 |
Construction of messonary well and boundary wall near ICDS center |
366000 |
Construction of messonary well and boundary wall near ICDS center1 |
Roof laid |
-
latitude : 23.6448023
Longitude : 87.2430431
file name : Image_01082023130416195.png
|
2023-08-01 13:04:16.286683 |
139 |
58412882 |
Construction of messonary well and boundary wall near ICDS center |
366000 |
Construction of messonary well and boundary wall near ICDS center1 |
Plinth level |
-
latitude : 23.64229778
Longitude : 87.2425905
file name : Image_31072023174026526.png
|
2023-07-31 17:40:26.63645 |
140 |
58412882 |
Construction of messonary well and boundary wall near ICDS center |
366000 |
Construction of messonary well and boundary wall near ICDS center1 |
Completion of work |
-
latitude : 23.64223912
Longitude : 87.24263216
file name : Image_31072023113449734.png
|
2023-07-31 11:34:49.849253 |
141 |
58142415 |
Construction of new drain from opp Shanti Mondal house Bikash Addya house |
150150 |
Construction of new drain from opp Shanti Mondal house Bikash Addya house1 |
Roof laid |
-
latitude : 23.6519049,23.6519049
Longitude : 87.244614,87.244614
file name : Image_31072023171553148.png
|
2023-07-31 17:15:53.245878 |
142 |
58142415 |
Construction of new drain from opp Shanti Mondal house Bikash Addya house |
150150 |
Construction of new drain from opp Shanti Mondal house Bikash Addya house1 |
Plinth level |
-
latitude : 23.6518872,23.6519149
Longitude : 87.2446286,87.2444222
file name : Image_25072023112815304.png
|
2023-07-25 11:28:15.404018 |
143 |
58142415 |
Construction of new drain from opp Shanti Mondal house Bikash Addya house |
150150 |
Construction of new drain from opp Shanti Mondal house Bikash Addya house1 |
Plinth level |
-
latitude : 23.6519046,23.6519046
Longitude : 87.2446255,87.2446255
file name : Image_08062023165534277.png
|
2023-06-08 16:55:34.376454 |
144 |
58065506 |
GP renovation work of Ukhra GP |
342000 |
GP renovation work of Ukhra GP1 |
Roof laid |
-
latitude : 23.6537572
Longitude : 87.239948
file name : Image_31072023144410880.png
|
2023-07-31 14:44:10.970355 |
145 |
58065506 |
GP renovation work of Ukhra GP |
342000 |
GP renovation work of Ukhra GP1 |
Plinth level |
-
latitude : 23.6537604
Longitude : 87.2399471
file name : Image_31072023141629244.png
|
2023-07-31 14:16:29.330607 |
146 |
58065506 |
GP renovation work of Ukhra GP |
342000 |
GP renovation work of Ukhra GP1 |
Completion of work |
-
latitude : 23.6537615
Longitude : 87.2399439
file name : Image_31072023135956723.png
|
2023-07-31 13:59:56.798647 |
147 |
58254097 |
Construction of pucca drain including pipeline work at samsad VI |
175000 |
Construction of pucca drain including pipeline work at samsad VI1 |
Roof laid |
-
latitude : 23.6484724,23.6484724
Longitude : 87.2435019,87.2435019
file name : Image_09082023143119942.png
|
2023-08-09 14:31:20.047613 |
148 |
58254097 |
Construction of pucca drain including pipeline work at samsad VI |
175000 |
Construction of pucca drain including pipeline work at samsad VI1 |
Plinth level |
-
latitude : 23.6484754,23.6484754
Longitude : 87.2434974,87.2434974
file name : Image_08082023153758158.png
|
2023-08-08 15:37:58.246087 |
149 |
58254097 |
Construction of pucca drain including pipeline work at samsad VI |
175000 |
Construction of pucca drain including pipeline work at samsad VI1 |
Completion of work |
-
latitude : 23.6484751,23.6484751
Longitude : 87.2434987,87.2434987
file name : Image_08082023151431775.png
|
2023-08-08 15:14:31.909705 |
150 |
58276732 |
Construction of pucca drain from Shib mandir near kuyo tala to Sujit Singh house including well |
142000 |
Construction of pucca drain from Shib mandir near kuyo tala to Sujit Singh house including well 1 |
Completion of work |
-
latitude : 23.64888918
Longitude : 87.25658559
file name : Image_09082023154903244.png
|
2023-08-09 15:49:03.366767 |
151 |
58248707 |
Construction of road with drain from main road Ashirbad marriage hall via electric office |
181814 |
Construction of road with drain from main road Ashirbad marriage hall via electric office 1 |
Roof laid |
-
latitude : 23.653275,23.653423
Longitude : 87.2392426,87.2391874
file name : Image_23082023132319415.png
|
2023-08-23 13:23:19.499124 |
152 |
34394359 |
Construction of PCC Road from Liyakat House to Mafijul Sk House |
136120 |
Construction of PCC Road from Liyakat House to Mafijul Sk House1 |
Roof laid |
-
latitude : 23.64635948,23.64635948
Longitude : 87.24300696,87.24300696
file name : Image_01092022124000300.png
|
2022-09-01 12:40:00.42875 |
153 |
34394359 |
Construction of PCC Road from Liyakat House to Mafijul Sk House |
136120 |
Construction of PCC Road from Liyakat House to Mafijul Sk House1 |
Roof laid |
-
latitude : 23.65399356,23.65399475
Longitude : 87.2458944,87.24590141
file name : Image_22082022123016319.png
|
2022-08-22 12:30:16.416031 |
154 |
39063857 |
COST OF WOMEN TOILET AT GP OFFICE |
67351 |
COST OF WOMEN TOILET AT GP OFFICE1 |
Roof laid |
-
latitude : 23.6537943
Longitude : 87.2400235
file name : Image_16112022143049119.png
|
2022-11-16 14:30:49.28183 |
155 |
39063857 |
COST OF WOMEN TOILET AT GP OFFICE |
67351 |
COST OF WOMEN TOILET AT GP OFFICE1 |
Roof laid |
-
latitude : 23.6537928
Longitude : 87.2400281
file name : Image_10112022144950491.png
|
2022-11-10 14:49:50.587774 |
156 |
39063857 |
COST OF WOMEN TOILET AT GP OFFICE |
67351 |
COST OF WOMEN TOILET AT GP OFFICE1 |
Plinth level |
-
latitude : 23.6537546
Longitude : 87.240019
file name : Image_01092022151831241.png
|
2022-09-01 15:18:31.338619 |
157 |
39059425 |
Construction of Pucca Drain with Slabe from Rathghar |
298696 |
Construction of Pucca Drain with Slabe from Rathghar 1 |
Roof laid |
-
latitude : 23.6461038,23.6461038,23.6461038
Longitude : 87.2424943,87.2424943,87.2424943
file name : Image_05012022150201569.png
|
2022-01-05 15:02:01.663173 |
158 |
39059425 |
Construction of Pucca Drain with Slabe from Rathghar |
298696 |
Construction of Pucca Drain with Slabe from Rathghar 1 |
Plinth level |
-
latitude : 23.6459699,23.6459699,23.6459699
Longitude : 87.2424482,87.2424482,87.2424482
file name : Image_05012022142324086.png
|
2022-01-05 14:23:24.177744 |
159 |
39053479 |
Construction of boundary wall and new well |
354178 |
Construction of boundary wall and new well 1 |
Roof laid |
-
latitude : 23.6501959,23.6501959
Longitude : 87.2466772,87.2466772
file name : Image_15092021161951477.png
|
2021-09-15 16:19:51.573452 |
160 |
34471918 |
Construction of PCC Road from Samsan to Laltu Chatterjee House |
353357 |
Construction of PCC Road from Samsan to Laltu Chatterjee House1 |
Roof laid |
-
latitude : 23.6472282,23.6472282
Longitude : 87.2515102,87.2515102
file name : Image_07092021153133851.png
|
2021-09-07 15:31:33.973309 |
161 |
34471918 |
Construction of PCC Road from Samsan to Laltu Chatterjee House |
353357 |
Construction of PCC Road from Samsan to Laltu Chatterjee House1 |
Completion of work |
-
latitude : 23.65060644,23.6472283,23.6472283
Longitude : 87.24864741,87.2515091,87.2515091
file name : Image_07092021152208118.png
|
2021-09-07 15:22:08.207313 |
162 |
34472917 |
Construction of Well at Ukhra 1 no Brajabhusan Primary School |
219717 |
Construction of Well at Ukhra 1 no Brajabhusan Primary School1 |
Roof laid |
-
latitude : 23.64459376
Longitude : 87.24534677
file name : Image_05082021151559564.png
|
2021-08-05 15:15:59.65278 |
163 |
39053699 |
Construction of new well near Mithu Chatterjee house |
208158 |
Construction of new well near Mithu Chatterjee house1 |
Roof laid |
-
latitude : 23.653295
Longitude : 87.2424633
file name : Image_11052022152806172.png
|
2022-05-11 15:28:06.288988 |
164 |
66485598 |
Greywater management system |
192000 |
Greywater management system1 |
Plinth level |
-
latitude : 23.64334837,23.64336604
Longitude : 87.24567742,87.2456499
file name : Image_08092023112152596.png
|
2023-09-08 11:21:52.689195 |
165 |
66485598 |
Greywater management system |
192000 |
Greywater management system1 |
Completion of work |
-
latitude : 23.64334299,23.64334299
Longitude : 87.24197737,87.24197737
file name : Image_07092023135758720.png
|
2023-09-07 13:57:58.813911 |
166 |
66486145 |
Greywater management system |
360000 |
Greywater management system1 |
Completion of work |
-
latitude : 23.6416963
Longitude : 87.24453209
file name : Image_08092023111205775.png
|
2023-09-08 11:12:05.866607 |
167 |
66486145 |
Greywater management system |
360000 |
Greywater management system2 |
Completion of work |
-
latitude : 23.64133783
Longitude : 87.24738645
file name : Image_08092023111807934.png
|
2023-09-08 11:18:08.02029 |
168 |
66486145 |
Greywater management system |
360000 |
Greywater management system3 |
Completion of work |
-
latitude : 23.6448553
Longitude : 87.2452803
file name : Image_08092023112532145.png
|
2023-09-08 11:25:32.231609 |
169 |
66486145 |
Greywater management system |
360000 |
Greywater management system4 |
Completion of work |
-
latitude : 23.6468341
Longitude : 87.247869
file name : Image_08092023112742987.png
|
2023-09-08 11:27:43.079376 |
170 |
66486145 |
Greywater management system |
360000 |
Greywater management system5 |
Completion of work |
-
latitude : 23.6479967
Longitude : 87.24679916
file name : Image_08092023113017010.png
|
2023-09-08 11:30:17.122153 |
171 |
66486145 |
Greywater management system |
360000 |
Greywater management system6 |
Completion of work |
-
latitude : 23.65089561
Longitude : 87.2393476
file name : Image_08092023113813190.png
|
2023-09-08 11:38:13.291982 |
172 |
48502204 |
CONSTRUCTION OF DRAIN WITH SLAB FROM MONORANJAN HOUSE TO AHWAN SANGHA |
116870 |
CONSTRUCTION OF DRAIN WITH SLAB FROM MONORANJAN HOUSE TO AHWAN SANGHA1 |
Roof laid |
-
latitude : 23.6536423,23.6536423
Longitude : 87.2392582,87.2392582
file name : Image_07092023162152984.png
|
2023-09-07 16:21:53.083379 |
173 |
48502204 |
CONSTRUCTION OF DRAIN WITH SLAB FROM MONORANJAN HOUSE TO AHWAN SANGHA |
116870 |
CONSTRUCTION OF DRAIN WITH SLAB FROM MONORANJAN HOUSE TO AHWAN SANGHA1 |
Plinth level |
-
latitude : 23.6536274,23.6536274
Longitude : 87.239205,87.239205
file name : Image_07092023134552798.png
|
2023-09-07 13:45:52.889432 |
174 |
58553512 |
Repiring of Madrasa at Gulzarbag including water pipeline work |
163380 |
Repiring of Madrasa at Gulzarbag including water pipeline work 1 |
Roof laid |
-
latitude : 23.65420847,23.65420847
Longitude : 87.24030085,87.24030085
file name : Image_22092023121434415.png
|
2023-09-22 12:14:34.50809 |
175 |
58553512 |
Repiring of Madrasa at Gulzarbag including water pipeline work |
163380 |
Repiring of Madrasa at Gulzarbag including water pipeline work 1 |
Plinth level |
-
latitude : 23.65427432,23.65427432
Longitude : 87.24022257,87.24022257
file name : Image_22092023120919221.png
|
2023-09-22 12:09:19.301631 |
176 |
58553512 |
Repiring of Madrasa at Gulzarbag including water pipeline work |
163380 |
Repiring of Madrasa at Gulzarbag including water pipeline work 1 |
Completion of work |
-
latitude : 23.65450421,23.65451265
Longitude : 87.24023502,87.24023062
file name : Image_22092023120439376.png
|
2023-09-22 12:04:39.457728 |
177 |
58262688 |
Construction of boundary wall and kitchen shed at Gulzarbag |
223000 |
Construction of boundary wall and kitchen shed at Gulzarbag1 |
Completion of work |
-
latitude : 23.65425733
Longitude : 87.24321562
file name : Image_10102023135156250.png
|
2023-10-10 13:51:56.34899 |
178 |
58357443 |
Construction of bathing ghat of Bakshi pukur with female room,chatal reparing and front gate |
312000 |
Construction of bathing ghat of Bakshi pukur with female room,chatal reparing and front gate1 |
Plinth level |
-
latitude : 23.64409427
Longitude : 87.24226463
file name : Image_12102023132241468.png
|
2023-10-12 13:22:41.59491 |
179 |
58357443 |
Construction of bathing ghat of Bakshi pukur with female room,chatal reparing and front gate |
312000 |
Construction of bathing ghat of Bakshi pukur with female room,chatal reparing and front gate1 |
Completion of work |
-
latitude : 23.64525976
Longitude : 87.24761921
file name : Image_10102023143955323.png
|
2023-10-10 14:39:55.54261 |
180 |
58260721 |
Repairing of ICDS center at Kankardanga including water pipeline work |
208000 |
Repairing of ICDS center at Kankardanga including water pipeline work1 |
Roof laid |
-
latitude : 23.65380018,23.65380018
Longitude : 87.24244283,87.24244283
file name : Image_13102023170755850.png
|
2023-10-13 17:07:55.9307 |
181 |
58260721 |
Repairing of ICDS center at Kankardanga including water pipeline work |
208000 |
Repairing of ICDS center at Kankardanga including water pipeline work1 |
Plinth level |
-
latitude : 23.6535716,23.6535716
Longitude : 87.2423531,87.2423531
file name : Image_13102023170425323.png
|
2023-10-13 17:04:25.399399 |
182 |
58260721 |
Repairing of ICDS center at Kankardanga including water pipeline work |
208000 |
Repairing of ICDS center at Kankardanga including water pipeline work1 |
Completion of work |
-
latitude : 23.6533955,23.6538905
Longitude : 87.2421105,87.24247263
file name : Image_10102023143916004.png
|
2023-10-10 14:39:16.119952 |
183 |
58141594 |
Repiring work of drain, road, slab of Ukhra GP area |
350000 |
Repiring work of drain, road, slab of Ukhra GP area1 |
Roof laid |
-
latitude : 23.6540889
Longitude : 87.242467
file name : Image_26092023162151539.png
|
2023-09-26 16:21:51.631375 |
184 |
58141594 |
Repiring work of drain, road, slab of Ukhra GP area |
350000 |
Repiring work of drain, road, slab of Ukhra GP area1 |
Plinth level |
-
latitude : 23.65392229
Longitude : 87.24261788
file name : Image_26092023161219731.png
|
2023-09-26 16:12:19.813066 |
185 |
58141594 |
Repiring work of drain, road, slab of Ukhra GP area |
350000 |
Repiring work of drain, road, slab of Ukhra GP area1 |
Completion of work |
-
latitude : 23.65395937
Longitude : 87.24266103
file name : Image_26092023160632719.png
|
2023-09-26 16:06:32.810906 |
186 |
67987688 |
Creation of drainage channel for management of grey water |
220000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.6538155
Longitude : 87.2423518
file name : Image_04092024165628431.png
|
2024-09-04 16:56:28.546603 |
187 |
67987688 |
Creation of drainage channel for management of grey water |
220000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.653838
Longitude : 87.2424133
file name : Image_04092024163857684.png
|
2024-09-04 16:38:57.777029 |
188 |
67987688 |
Creation of drainage channel for management of grey water |
220000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.6537999
Longitude : 87.2423538
file name : Image_04092024150252373.png
|
2024-09-04 15:02:52.48856 |
189 |
66486608 |
Operation & maintenance of drinking water supply system |
250000 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 23.6453146
Longitude : 87.2426063
file name : Image_03012024131805856.png
|
2024-01-03 13:18:05.912237 |
190 |
66486608 |
Operation & maintenance of drinking water supply system |
250000 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.6458953
Longitude : 87.2427218
file name : Image_03012024131041401.png
|
2024-01-03 13:10:41.45381 |
191 |
66486608 |
Operation & maintenance of drinking water supply system |
250000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.6458327
Longitude : 87.2427006
file name : Image_02012024145353614.png
|
2024-01-02 14:53:53.675615 |
192 |
68014436 |
Plant trees to reduce the impact of pollution |
346000 |
Plant trees to reduce the impact of pollution1 |
Roof laid |
-
latitude : 23.65082645
Longitude : 87.25252511
file name : Image_11032024150535887.png
|
2024-03-11 15:05:35.977573 |
193 |
68014436 |
Plant trees to reduce the impact of pollution |
346000 |
Plant trees to reduce the impact of pollution1 |
Plinth level |
-
latitude : 23.6502971
Longitude : 87.251985
file name : Image_04012024113406475.png
|
2024-01-04 11:34:06.540349 |
194 |
68014436 |
Plant trees to reduce the impact of pollution |
346000 |
Plant trees to reduce the impact of pollution1 |
Completion of work |
-
latitude : 23.65364672
Longitude : 87.23981529
file name : Image_28122023134643607.png
|
2023-12-28 13:46:43.700069 |
195 |
67986633 |
Creation of soak pits for individual Household for onsite Grey Water Management |
213000 |
Creation of soak pits for individual Household for onsite Grey Water Management1 |
Roof laid |
-
latitude : 23.64449193
Longitude : 87.24920681
file name : Image_03042024114639498.png
|
2024-04-03 11:46:39.585598 |
196 |
67986633 |
Creation of soak pits for individual Household for onsite Grey Water Management |
213000 |
Creation of soak pits for individual Household for onsite Grey Water Management1 |
Plinth level |
-
latitude : 23.6449673
Longitude : 87.2453065
file name : Image_04012024112724545.png
|
2024-01-04 11:27:24.603499 |
197 |
67986633 |
Creation of soak pits for individual Household for onsite Grey Water Management |
213000 |
Creation of soak pits for individual Household for onsite Grey Water Management1 |
Completion of work |
-
latitude : 23.6447365
Longitude : 87.2496049
file name : Image_29122023113600042.png
|
2023-12-29 11:36:00.104178 |
198 |
67987997 |
Creation of drainage channel for management of grey water |
218000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.64709075
Longitude : 87.24715371
file name : Image_15012024154939042.png
|
2024-01-15 15:49:39.096176 |
199 |
67987997 |
Creation of drainage channel for management of grey water |
218000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.6472464
Longitude : 87.2465718
file name : Image_15012024154015458.png
|
2024-01-15 15:40:15.517173 |
200 |
67987997 |
Creation of drainage channel for management of grey water |
218000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.6466889
Longitude : 87.24776411
file name : Image_15012024114334603.png
|
2024-01-15 11:43:34.658545 |
201 |
67987443 |
Creation of community soak pits for group of Households |
206512 |
Creation of community soak pits for group of Households1 |
Roof laid |
-
latitude : 23.6494833
Longitude : 87.2420025
file name : Image_22012024152350676.png
|
2024-01-22 15:23:50.730512 |
202 |
67987443 |
Creation of community soak pits for group of Households |
206512 |
Creation of community soak pits for group of Households1 |
Plinth level |
-
latitude : 23.6488775
Longitude : 87.241784
file name : Image_22012024113207758.png
|
2024-01-22 11:32:07.809393 |
203 |
67987443 |
Creation of community soak pits for group of Households |
206512 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 23.6494627
Longitude : 87.2419935
file name : Image_15012024115053130.png
|
2024-01-15 11:50:53.186073 |
204 |
67995239 |
Providing piped water supply to public institutions |
269000 |
Providing piped water supply to public institutions1 |
Roof laid |
-
latitude : 23.6511167,23.6511167
Longitude : 87.2432704,87.2432704
file name : Image_07022024141134466.png
|
2024-02-07 14:11:34.530719 |
205 |
67995239 |
Providing piped water supply to public institutions |
269000 |
Providing piped water supply to public institutions1 |
Plinth level |
-
latitude : 23.6509681,23.6509681
Longitude : 87.2431878,87.2431878
file name : Image_06022024134643155.png
|
2024-02-06 13:46:43.22467 |
206 |
67995239 |
Providing piped water supply to public institutions |
269000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 23.6510268,23.6510268
Longitude : 87.2431931,87.2431931
file name : Image_01022024141709116.png
|
2024-02-01 14:17:09.236915 |
207 |
67995933 |
Creation of a new source of drinking water |
239400 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.65400837
Longitude : 87.23972401
file name : Image_16042024171827265.png
|
2024-04-16 17:18:27.364904 |
208 |
67995933 |
Creation of a new source of drinking water |
239400 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.63850594
Longitude : 87.24686147
file name : Image_16042024093016798.png
|
2024-04-16 09:30:16.881555 |
209 |
67995933 |
Creation of a new source of drinking water |
239400 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.6385999
Longitude : 87.24700426
file name : Image_03042024113953896.png
|
2024-04-03 11:39:53.99405 |
210 |
66485434 |
Greywater management system |
311000 |
Greywater management system1 |
Roof laid |
-
latitude : 23.6534991,23.6534991
Longitude : 87.2411805,87.2411805
file name : Image_04092024165430699.png
|
2024-09-04 16:54:30.802362 |
211 |
66485434 |
Greywater management system |
311000 |
Greywater management system1 |
Plinth level |
-
latitude : 23.6535336,23.6535336
Longitude : 87.241074,87.241074
file name : Image_04092024163712381.png
|
2024-09-04 16:37:12.50193 |
212 |
66485434 |
Greywater management system |
311000 |
Greywater management system1 |
Completion of work |
-
latitude : 23.6528497,23.6528497
Longitude : 87.2421142,87.2421142
file name : Image_04092024150309812.png
|
2024-09-04 15:03:09.927983 |
213 |
66485434 |
Greywater management system |
311000 |
Greywater management system1 |
Completion of work |
-
latitude : 23.6528497,23.6528497
Longitude : 87.2421142,87.2421142
file name : Image_04092024150300794.png
|
2024-09-04 15:03:00.89563 |
214 |
67925710 |
Roadside Plantation |
197964 |
Roadside Plantation1 |
Roof laid |
-
latitude : 23.65238257,23.65238413
Longitude : 87.24835597,87.2483544
file name : Image_15012024153502360.png
|
2024-01-15 15:35:02.414483 |
215 |
67925710 |
Roadside Plantation |
197964 |
Roadside Plantation1 |
Plinth level |
-
latitude : 23.65389071,23.65389071,23.6573633
Longitude : 87.23995436,87.23995436,87.2480113
file name : Image_15012024152934952.png
|
2024-01-15 15:29:35.089698 |
216 |
67925710 |
Roadside Plantation |
197964 |
Roadside Plantation1 |
Completion of work |
-
latitude : 23.65232293,23.65232438
Longitude : 87.24832201,87.24832252
file name : Image_15012024114342039.png
|
2024-01-15 11:43:42.094464 |
217 |
67925710 |
Roadside Plantation |
197964 |
Roadside Plantation1 |
Completion of work |
-
latitude : 23.65232293,23.65232438
Longitude : 87.24832201,87.24832252
file name : Image_15012024114337404.png
|
2024-01-15 11:43:37.459436 |
218 |
68017332 |
Construction of roads |
198000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6507247,23.6507247
Longitude : 87.24601,87.24601
file name : Image_31052024134957835.png
|
2024-05-31 13:49:57.921379 |
219 |
68017332 |
Construction of roads |
198000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.6507954,23.6507954
Longitude : 87.2460205,87.2460205
file name : Image_31052024134340998.png
|
2024-05-31 13:43:41.077291 |
220 |
68017332 |
Construction of roads |
198000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6511635,23.6511635
Longitude : 87.2453846,87.2453846
file name : Image_31052024133315737.png
|
2024-05-31 13:33:15.834399 |
221 |
67987566 |
Creation of drainage channel for management of grey water |
158550 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.65105507
Longitude : 87.23935926
file name : Image_20082024151236734.png
|
2024-08-20 15:12:36.82236 |
222 |
67987566 |
Creation of drainage channel for management of grey water |
158550 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.65096277
Longitude : 87.23944993
file name : Image_15072024105321980.png
|
2024-07-15 10:53:22.084242 |
223 |
67987566 |
Creation of drainage channel for management of grey water |
158550 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.65104042
Longitude : 87.23939684
file name : Image_05072024161229841.png
|
2024-07-05 16:12:29.935692 |
224 |
68023084 |
Construction of roads |
193000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6565544,23.6565544
Longitude : 87.2342879,87.2342879
file name : Image_29012024154527987.png
|
2024-01-29 15:45:28.048757 |
225 |
68023084 |
Construction of roads |
193000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.6565493,23.6565493
Longitude : 87.2343015,87.2343015
file name : Image_29012024153013514.png
|
2024-01-29 15:30:13.577515 |
226 |
68023084 |
Construction of roads |
193000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6565515,23.6565515
Longitude : 87.2343316,87.2343316
file name : Image_29012024151702265.png
|
2024-01-29 15:17:02.327703 |
227 |
67874520 |
Repairing and maintenance of roads |
157000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 23.6516165,23.6516165
Longitude : 87.2367433,87.2367433
file name : Image_07022024162830454.png
|
2024-02-07 16:28:30.512758 |
228 |
67874520 |
Repairing and maintenance of roads |
157000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 23.6520077,23.6520077
Longitude : 87.2375977,87.2375977
file name : Image_06022024115304644.png
|
2024-02-06 11:53:04.747543 |
229 |
67874520 |
Repairing and maintenance of roads |
157000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 23.6519394,23.6519394
Longitude : 87.2375601,87.2375601
file name : Image_01022024145422874.png
|
2024-02-01 14:54:22.931822 |
230 |
67981682 |
Any other operation and maintenance needs related to solid waste management |
120000 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 23.64746874
Longitude : 87.26209126
file name : Image_05092024164309201.png
|
2024-09-05 16:43:09.298058 |
231 |
67981682 |
Any other operation and maintenance needs related to solid waste management |
120000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 23.64749336
Longitude : 87.26201551
file name : Image_05092024163756930.png
|
2024-09-05 16:37:57.017447 |
232 |
67981682 |
Any other operation and maintenance needs related to solid waste management |
120000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 23.64752892
Longitude : 87.26206219
file name : Image_05092024163153806.png
|
2024-09-05 16:31:53.907183 |
233 |
68022719 |
Construction of roads |
217201 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6443367,23.6443367
Longitude : 87.2444062,87.2444062
file name : Image_04122023152625014.png
|
2023-12-04 15:26:25.088282 |
234 |
68022719 |
Construction of roads |
217201 |
Construction of roads1 |
Plinth level |
-
latitude : 23.6450552,23.6450552
Longitude : 87.2434166,87.2434166
file name : Image_04122023140550235.png
|
2023-12-04 14:05:50.295668 |
235 |
68022719 |
Construction of roads |
217201 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6450515,23.6450515
Longitude : 87.2447804,87.2447804
file name : Image_01122023163151542.png
|
2023-12-01 16:31:51.622627 |
236 |
64854040 |
Repair of drainage channel |
203852 |
Repair of drainage channel1 |
Roof laid |
-
latitude : 23.6479435,23.6479435
Longitude : 87.248965,87.248965
file name : Image_29032023164805523.png
|
2023-03-29 16:48:05.623257 |
237 |
64854040 |
Repair of drainage channel |
203852 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 23.6482379,23.6482379
Longitude : 87.2486017,87.2486017
file name : Image_02022023163441030.png
|
2023-02-02 16:34:41.130619 |
238 |
48365231 |
CONSTRUCTION OF BOUNDARYB WALL NEAR AYKATAN CLUB,SAMSAD VI |
158000 |
CONSTRUCTION OF BOUNDARYB WALL NEAR AYKATAN CLUB,SAMSAD VI1 |
Roof laid |
-
latitude : 23.6508401
Longitude : 87.245982
file name : Image_31032023131912441.png
|
2023-03-31 13:19:12.573639 |
239 |
48436979 |
CONSTRUCTION OF PUCCA DRAIN FROM CHANDAN RUIDAS HOUSE TO KAMAL RUIDAS HOUSE |
154263 |
CONSTRUCTION OF PUCCA DRAIN FROM CHANDAN RUIDAS HOUSE TO KAMAL RUIDAS HOUSE1 |
Roof laid |
-
latitude : 23.64701702,23.64701702
Longitude : 87.25026767,87.25026767
file name : Image_13052023114200044.png
|
2023-05-13 11:42:00.127789 |
240 |
48436979 |
CONSTRUCTION OF PUCCA DRAIN FROM CHANDAN RUIDAS HOUSE TO KAMAL RUIDAS HOUSE |
154263 |
CONSTRUCTION OF PUCCA DRAIN FROM CHANDAN RUIDAS HOUSE TO KAMAL RUIDAS HOUSE1 |
Plinth level |
-
latitude : 23.6470099,23.6470099
Longitude : 87.2504508,87.2504508
file name : Image_03022023151853014.png
|
2023-02-03 15:18:53.111455 |
241 |
48437204 |
Construction of well near abale kali mandir |
234000 |
Construction of well near abale kali mandir1 |
Roof laid |
-
latitude : 23.6443127
Longitude : 87.24512305
file name : Image_31032023132413542.png
|
2023-03-31 13:24:13.665707 |
242 |
58275852 |
Construction of pcc road from near over bridge to Sanjoy Gour house |
102664 |
Construction of pcc road from near over bridge to Sanjoy Gour house 1 |
Roof laid |
-
latitude : 23.6496361,23.6496361
Longitude : 87.2558479,87.2558479
file name : Image_29032023163216624.png
|
2023-03-29 16:32:16.740696 |
243 |
58244970 |
Construction of messonary well near Subhas para |
205000 |
Construction of messonary well near Subhas para1 |
Roof laid |
-
latitude : 23.650693
Longitude : 87.2424286
file name : Image_06042023112953062.png
|
2023-04-06 11:29:53.151982 |
244 |
58278476 |
Construction of pcc road from Bibhas Karkamar house to Dinu Ruidas house |
122614 |
Construction of pcc road from Bibhas Karkamar house to Dinu Ruidas house 1 |
Roof laid |
-
latitude : 23.6449316,23.6449316
Longitude : 87.2485499,87.2485499
file name : Image_06042023112306036.png
|
2023-04-06 11:23:06.125891 |
245 |
58257357 |
Construction of pucca drain and cover with culvert from Mahadeb Dawn house to Nathu Gorai house |
101143 |
Construction of pucca drain and cover with culvert from Mahadeb Dawn house to Nathu Gorai house1 |
Roof laid |
-
latitude : 23.6461356,23.6461356
Longitude : 87.2448847,87.2448847
file name : Image_13042023112055071.png
|
2023-04-13 11:20:55.167163 |
246 |
58390493 |
Construction of pcc road from Sagar Chatterjee house to Bherbagan pukur ghat |
118485 |
Construction of pcc road from Sagar Chatterjee house to Bherbagan pukur ghat1 |
Roof laid |
-
latitude : 23.6430361,23.6430361
Longitude : 87.2453178,87.2453178
file name : Image_14042023170948289.png
|
2023-04-14 17:09:48.390069 |
247 |
58277303 |
Construction of pcc road and drain from Raju Bauri house to Haba Mukherjee house |
115200 |
Construction of pcc road and drain from Raju Bauri house to Haba Mukherjee house1 |
Roof laid |
-
latitude : 23.6481428,23.6481428
Longitude : 87.2453948,87.2453948
file name : Image_18042023131047245.png
|
2023-04-18 13:10:47.323767 |
248 |
58259467 |
Repairing of drain from Nanda Jha house to Burman house including water pipeline work |
205000 |
Repairing of drain from Nanda Jha house to Burman house including water pipeline work1 |
Roof laid |
-
latitude : 23.6502635,23.6502635
Longitude : 87.2415385,87.2415385
file name : Image_20042023081455530.png
|
2023-04-20 08:14:55.624576 |
249 |
58259467 |
Repairing of drain from Nanda Jha house to Burman house including water pipeline work |
205000 |
Repairing of drain from Nanda Jha house to Burman house including water pipeline work1 |
Roof laid |
-
latitude : 23.6502638,23.6502638
Longitude : 87.2415373,87.2415373
file name : Image_20042023081550300.png
|
2023-04-20 08:15:50.415922 |
250 |
58252279 |
Construction of pcc road from Ashis Banerjee house to Rekha Banerjee house |
90520 |
Construction of pcc road from Ashis Banerjee house to Rekha Banerjee house1 |
Roof laid |
-
latitude : 23.6519667,23.6519667
Longitude : 87.2435697,87.2435697
file name : Image_14042023171701655.png
|
2023-04-14 17:17:01.75024 |
251 |
58252279 |
Construction of pcc road from Ashis Banerjee house to Rekha Banerjee house |
90520 |
Construction of pcc road from Ashis Banerjee house to Rekha Banerjee house1 |
Roof laid |
-
latitude : 23.6519993,23.6519993
Longitude : 87.2435635,87.2435635
file name : Image_18042023120008072.png
|
2023-04-18 12:00:08.181123 |
252 |
58247674 |
Construction of pcc road from cinema bazar Jawar jewellary shop to Naru shop |
185000 |
Construction of pcc road from cinema bazar Jawar jewellary shop to Naru shop1 |
Roof laid |
-
latitude : 23.6527233,23.6527233
Longitude : 87.2405503,87.2405503
file name : Image_17052023133800874.png
|
2023-05-17 13:38:00.967167 |
253 |
58399684 |
Construction of pucca drain from Dulal Maji house to Durga pukur |
146000 |
Construction of pucca drain from Dulal Maji house to Durga pukur1 |
Roof laid |
-
latitude : 23.6394132,23.6394132
Longitude : 87.24567111,87.24567111
file name : Image_09052023094928062.png
|
2023-05-09 09:49:28.152411 |
254 |
67981927 |
Any other operation and maintenance needs related to solid waste management |
130000 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 23.64759719
Longitude : 87.26210117
file name : Image_05092024164211623.png
|
2024-09-05 16:42:11.712029 |
255 |
67981927 |
Any other operation and maintenance needs related to solid waste management |
130000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 23.64758336
Longitude : 87.26208109
file name : Image_05092024163827210.png
|
2024-09-05 16:38:27.317998 |
256 |
67981927 |
Any other operation and maintenance needs related to solid waste management |
130000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 23.64763708
Longitude : 87.26211415
file name : Image_05092024163231419.png
|
2024-09-05 16:32:31.522312 |
257 |
58354635 |
Construction of pucca drain from Raju Ruidas house to choto voska |
172000 |
Construction of pucca drain from Raju Ruidas house to choto voska 1 |
Roof laid |
-
latitude : 23.65030763,23.65030763
Longitude : 87.23977574,87.23977574
file name : Image_26052023154737094.png
|
2023-05-26 15:47:37.186031 |
258 |
66485701 |
CONSTRUCTION OF PCC ROAD AT SANSAD NO. XIX AREA |
163710 |
CONSTRUCTION OF PCC ROAD AT SANSAD NO. XIX AREA1 |
Roof laid |
-
latitude : 23.64334925,23.64334925
Longitude : 87.24196238,87.24196238
file name : Image_23052023163557616.png
|
2023-05-23 16:35:57.711853 |
259 |
58255783 |
Construction of bathing ghat at padma pukur |
96000 |
Construction of bathing ghat at padma pukur1 |
Roof laid |
-
latitude : 23.6484252
Longitude : 87.2434953
file name : Image_31052023145349472.png
|
2023-05-31 14:53:49.565235 |
260 |
58253285 |
Construction of latrine at ICDS center including water pipeline work neafr bishalaxmi tala |
262000 |
Construction of latrine at ICDS center including water pipeline work neafr bishalaxmi tala 1 |
Roof laid |
-
latitude : 23.6506592,23.6506592
Longitude : 87.2469605,87.2469605
file name : Image_01062023183659656.png
|
2023-06-01 18:36:59.740567 |
261 |
58577875 |
Construction of pucca drain from Salim Khan house to Rabiul house |
135380 |
Construction of pucca drain from Salim Khan house to Rabiul house1 |
Roof laid |
-
latitude : 23.6563442,23.6563442
Longitude : 87.2360963,87.2360963
file name : Image_13052023173201957.png
|
2023-05-13 17:32:02.052638 |
262 |
58142115 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp |
252723 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp1 |
Roof laid |
-
latitude : 23.6537576
Longitude : 87.2400129
file name : Image_06122023163023550.png
|
2023-12-06 16:30:23.606776 |
263 |
58142115 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp |
252723 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp1 |
Plinth level |
-
latitude : 23.6537661
Longitude : 87.2400237
file name : Image_06122023161826629.png
|
2023-12-06 16:18:26.697839 |
264 |
58142115 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp |
252723 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp1 |
Completion of work |
-
latitude : 23.6537644
Longitude : 87.2400208
file name : Image_06122023161207101.png
|
2023-12-06 16:12:07.168856 |
265 |
58142115 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp |
252723 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp1 |
Completion of work |
-
latitude : 23.6537687
Longitude : 87.2400225
file name : Image_06122023152644240.png
|
2023-12-06 15:26:44.297402 |
266 |
58142115 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp |
252723 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp1 |
Completion of work |
-
latitude : 23.6537648
Longitude : 87.2400229
file name : Image_06122023140213803.png
|
2023-12-06 14:02:13.860264 |
267 |
58142115 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp |
252723 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp1 |
Completion of work |
-
latitude : 23.6537719
Longitude : 87.2400037
file name : Image_04122023161919725.png
|
2023-12-04 16:19:19.792809 |
268 |
58142115 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp |
252723 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp1 |
Completion of work |
-
latitude : 23.6536752
Longitude : 87.2399211
file name : Image_04122023134234980.png
|
2023-12-04 13:42:35.033716 |
269 |
58142115 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp |
252723 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp2 |
Roof laid |
-
latitude : 23.653626
Longitude : 87.2399471
file name : Image_06122023163130277.png
|
2023-12-06 16:31:30.338662 |
270 |
58142115 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp |
252723 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp2 |
Plinth level |
-
latitude : 23.6539136
Longitude : 87.2398361
file name : Image_06122023161909466.png
|
2023-12-06 16:19:09.523488 |
271 |
58142115 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp |
252723 |
Construction of seating room,shade including water filter and pipe line work under ukhra gp2 |
Completion of work |
-
latitude : 23.6537687
Longitude : 87.2400208
file name : Image_06122023161209786.png
|
2023-12-06 16:12:09.845072 |
272 |
68018228 |
Construction of roads |
194000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.648968,23.648968
Longitude : 87.2540069,87.2540069
file name : Image_06122023160128623.png
|
2023-12-06 16:01:28.678251 |
273 |
68018228 |
Construction of roads |
194000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.6489309,23.6489309
Longitude : 87.2540231,87.2540231
file name : Image_06122023155726493.png
|
2023-12-06 15:57:26.547495 |
274 |
68018228 |
Construction of roads |
194000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6489402,23.6489402
Longitude : 87.2540286,87.2540286
file name : Image_06122023155039973.png
|
2023-12-06 15:50:40.031537 |
275 |
58139923 |
Supply of water Tank art different samsad of Ukhra GP |
350000 |
Supply of water Tank art different samsad of Ukhra GP1 |
Roof laid |
-
latitude : 23.6450096
Longitude : 87.2432376
file name : Image_27022024150444528.png
|
2024-02-27 15:04:44.599169 |
276 |
58139923 |
Supply of water Tank art different samsad of Ukhra GP |
350000 |
Supply of water Tank art different samsad of Ukhra GP1 |
Plinth level |
-
latitude : 23.653847
Longitude : 87.2444907
file name : Image_20022024120803854.png
|
2024-02-20 12:08:03.941215 |
277 |
58139923 |
Supply of water Tank art different samsad of Ukhra GP |
350000 |
Supply of water Tank art different samsad of Ukhra GP1 |
Completion of work |
-
latitude : 23.6518252
Longitude : 87.2406672
file name : Image_16022024123326269.png
|
2024-02-16 12:33:26.33341 |
278 |
58139923 |
Supply of water Tank art different samsad of Ukhra GP |
350000 |
Supply of water Tank art different samsad of Ukhra GP2 |
Roof laid |
-
latitude : 23.6450072
Longitude : 87.2432239
file name : Image_27022024150514642.png
|
2024-02-27 15:05:14.721465 |
279 |
58139923 |
Supply of water Tank art different samsad of Ukhra GP |
350000 |
Supply of water Tank art different samsad of Ukhra GP2 |
Plinth level |
-
latitude : 23.653851
Longitude : 87.244515
file name : Image_20022024120840275.png
|
2024-02-20 12:08:40.340566 |
280 |
58139923 |
Supply of water Tank art different samsad of Ukhra GP |
350000 |
Supply of water Tank art different samsad of Ukhra GP2 |
Completion of work |
-
latitude : 23.6515362
Longitude : 87.2416951
file name : Image_16022024123401230.png
|
2024-02-16 12:34:01.295549 |
281 |
58139923 |
Supply of water Tank art different samsad of Ukhra GP |
350000 |
Supply of water Tank art different samsad of Ukhra GP3 |
Roof laid |
-
latitude : 23.6449854
Longitude : 87.2432047
file name : Image_27022024150543896.png
|
2024-02-27 15:05:43.963729 |
282 |
58139923 |
Supply of water Tank art different samsad of Ukhra GP |
350000 |
Supply of water Tank art different samsad of Ukhra GP3 |
Plinth level |
-
latitude : 23.6538147
Longitude : 87.2444718
file name : Image_20022024120919122.png
|
2024-02-20 12:09:19.389651 |
283 |
58139923 |
Supply of water Tank art different samsad of Ukhra GP |
350000 |
Supply of water Tank art different samsad of Ukhra GP3 |
Completion of work |
-
latitude : 23.651859
Longitude : 87.2410325
file name : Image_16022024123438078.png
|
2024-02-16 12:34:38.162942 |
284 |
58139923 |
Supply of water Tank art different samsad of Ukhra GP |
350000 |
Supply of water Tank art different samsad of Ukhra GP1 |
Roof laid |
-
latitude : 23.6450034
Longitude : 87.2432165
file name : Image_27022024150611479.png
|
2024-02-27 15:06:11.546725 |
285 |
58139923 |
Supply of water Tank art different samsad of Ukhra GP |
350000 |
Supply of water Tank art different samsad of Ukhra GP1 |
Plinth level |
-
latitude : 23.65385
Longitude : 87.24443
file name : Image_20022024120957204.png
|
2024-02-20 12:09:57.272437 |
286 |
58139923 |
Supply of water Tank art different samsad of Ukhra GP |
350000 |
Supply of water Tank art different samsad of Ukhra GP1 |
Completion of work |
-
latitude : 23.6516241
Longitude : 87.2415631
file name : Image_16022024123507738.png
|
2024-02-16 12:35:07.801036 |
287 |
58139923 |
Supply of water Tank art different samsad of Ukhra GP |
350000 |
Supply of water Tank art different samsad of Ukhra GP2 |
Roof laid |
-
latitude : 23.6449956
Longitude : 87.2432184
file name : Image_27022024150645198.png
|
2024-02-27 15:06:45.275554 |
288 |
58139923 |
Supply of water Tank art different samsad of Ukhra GP |
350000 |
Supply of water Tank art different samsad of Ukhra GP2 |
Plinth level |
-
latitude : 23.6535083
Longitude : 87.2443031
file name : Image_20022024121034416.png
|
2024-02-20 12:10:34.481063 |
289 |
58139923 |
Supply of water Tank art different samsad of Ukhra GP |
350000 |
Supply of water Tank art different samsad of Ukhra GP2 |
Completion of work |
-
latitude : 23.651576
Longitude : 87.2416825
file name : Image_16022024123542457.png
|
2024-02-16 12:35:42.524243 |
290 |
58139923 |
Supply of water Tank art different samsad of Ukhra GP |
350000 |
Supply of water Tank art different samsad of Ukhra GP3 |
Roof laid |
-
latitude : 23.6449953
Longitude : 87.2432069
file name : Image_27022024150716783.png
|
2024-02-27 15:07:16.866112 |
291 |
58139923 |
Supply of water Tank art different samsad of Ukhra GP |
350000 |
Supply of water Tank art different samsad of Ukhra GP3 |
Plinth level |
-
latitude : 23.6538077
Longitude : 87.2436085
file name : Image_20022024121102555.png
|
2024-02-20 12:11:02.628227 |
292 |
58139923 |
Supply of water Tank art different samsad of Ukhra GP |
350000 |
Supply of water Tank art different samsad of Ukhra GP3 |
Completion of work |
-
latitude : 23.6516027
Longitude : 87.2416422
file name : Image_16022024123623328.png
|
2024-02-16 12:36:23.384725 |
293 |
67988564 |
Creation of Small-bore pipe conveyance system |
220000 |
Creation of Small-bore pipe conveyance system1 |
Roof laid |
-
latitude : 23.65480279
Longitude : 87.24258094
file name : Image_27022024135756128.png
|
2024-02-27 13:57:56.173871 |
294 |
67988564 |
Creation of Small-bore pipe conveyance system |
220000 |
Creation of Small-bore pipe conveyance system1 |
Plinth level |
-
latitude : 23.65479042
Longitude : 87.24257114
file name : Image_27022024135406441.png
|
2024-02-27 13:54:06.495055 |
295 |
67988564 |
Creation of Small-bore pipe conveyance system |
220000 |
Creation of Small-bore pipe conveyance system1 |
Completion of work |
-
latitude : 23.6538959
Longitude : 87.2423267
file name : Image_27022024134630598.png
|
2024-02-27 13:46:30.670295 |
296 |
68018028 |
Construction of roads |
241000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.64826382,23.64827176
Longitude : 87.25522773,87.25522437
file name : Image_21122023132522003.png
|
2023-12-21 13:25:22.055951 |
297 |
68018028 |
Construction of roads |
241000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.64819582,23.64820626
Longitude : 87.25516896,87.25515699
file name : Image_21122023125505144.png
|
2023-12-21 12:55:05.195213 |
298 |
68018028 |
Construction of roads |
241000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6485177,23.6485177
Longitude : 87.25537,87.25537
file name : Image_19122023120139632.png
|
2023-12-19 12:01:39.695891 |
299 |
68017110 |
Construction of roads |
180000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6510304,23.6510304
Longitude : 87.2430587,87.2430587
file name : Image_26122023134350010.png
|
2023-12-26 13:43:50.06722 |
300 |
68017110 |
Construction of roads |
180000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.6510095,23.6510095
Longitude : 87.2430984,87.2430984
file name : Image_26122023133838100.png
|
2023-12-26 13:38:38.162646 |
301 |
68017110 |
Construction of roads |
180000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6509819,23.6509819
Longitude : 87.2431169,87.2431169
file name : Image_21122023133705177.png
|
2023-12-21 13:37:05.231704 |
302 |
58071737 |
Smooth running of SLWM project of Ukhra GP |
204907 |
Smooth running of SLWM project of Ukhra GP1 |
Roof laid |
-
latitude : 23.64731603
Longitude : 87.26199139
file name : Image_21122023131925889.png
|
2023-12-21 13:19:25.956795 |
303 |
58071737 |
Smooth running of SLWM project of Ukhra GP |
204907 |
Smooth running of SLWM project of Ukhra GP1 |
Plinth level |
-
latitude : 23.6473546
Longitude : 87.26204326
file name : Image_21122023131020629.png
|
2023-12-21 13:10:20.694168 |
304 |
58071737 |
Smooth running of SLWM project of Ukhra GP |
204907 |
Smooth running of SLWM project of Ukhra GP1 |
Completion of work |
-
latitude : 23.64725377
Longitude : 87.26183836
file name : Image_21122023130254793.png
|
2023-12-21 13:02:54.853953 |
305 |
68022614 |
Construction of roads |
269000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6487038,23.6487038
Longitude : 87.2504054,87.2504054
file name : Image_26122023135405275.png
|
2023-12-26 13:54:05.331946 |
306 |
68022614 |
Construction of roads |
269000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.648689,23.648689
Longitude : 87.2503842,87.2503842
file name : Image_26122023134745983.png
|
2023-12-26 13:47:46.040314 |
307 |
68022614 |
Construction of roads |
269000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6486989,23.6486989
Longitude : 87.2504228,87.2504228
file name : Image_21122023125226566.png
|
2023-12-21 12:52:26.620993 |
308 |
67987119 |
Repair of drainage channel |
217000 |
Repair of drainage channel1 |
Roof laid |
-
latitude : 23.6509675
Longitude : 87.2452705
file name : Image_03012024133759431.png
|
2024-01-03 13:37:59.491949 |
309 |
67987119 |
Repair of drainage channel |
217000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 23.6511891
Longitude : 87.2454033
file name : Image_03012024133135311.png
|
2024-01-03 13:31:35.361903 |
310 |
67987119 |
Repair of drainage channel |
217000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 23.6511856
Longitude : 87.2454134
file name : Image_28122023135657702.png
|
2023-12-28 13:56:57.761794 |
311 |
68014989 |
Social forestry |
253000 |
Social forestry1 |
Roof laid |
-
latitude : 23.64156395
Longitude : 87.24456129
file name : Image_18032024171150400.png
|
2024-03-18 17:11:50.507015 |
312 |
68014989 |
Social forestry |
253000 |
Social forestry1 |
Plinth level |
-
latitude : 23.64156782
Longitude : 87.24459719
file name : Image_18032024112843217.png
|
2024-03-18 11:28:43.317797 |
313 |
68014989 |
Social forestry |
253000 |
Social forestry1 |
Completion of work |
-
latitude : 23.64165769
Longitude : 87.24457156
file name : Image_11032024145925942.png
|
2024-03-11 14:59:26.03573 |
314 |
68014736 |
Social forestry in grazing land |
286900 |
Social forestry in grazing land1 |
Roof laid |
-
latitude : 23.6449016
Longitude : 87.2486012
file name : Image_27052024173240029.png
|
2024-05-27 17:32:40.120384 |
315 |
68014736 |
Social forestry in grazing land |
286900 |
Social forestry in grazing land1 |
Plinth level |
-
latitude : 23.6449017
Longitude : 87.2486047
file name : Image_27052024111232835.png
|
2024-05-27 11:12:32.928776 |
316 |
68014736 |
Social forestry in grazing land |
286900 |
Social forestry in grazing land1 |
Completion of work |
-
latitude : 23.6449034
Longitude : 87.2486068
file name : Image_22052024141021437.png
|
2024-05-22 14:10:21.51799 |
317 |
68016829 |
Construction of roads |
158000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.64883305,23.64883305
Longitude : 87.2420256,87.2420256
file name : Image_04072024151340538.png
|
2024-07-04 15:13:40.7562 |
318 |
68016829 |
Construction of roads |
158000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.6497644,23.6497644
Longitude : 87.2406283,87.2406283
file name : Image_18062024131546174.png
|
2024-06-18 13:15:46.271891 |
319 |
68016829 |
Construction of roads |
158000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6498034,23.6498034
Longitude : 87.2405638,87.2405638
file name : Image_14062024142409491.png
|
2024-06-14 14:24:09.586264 |
320 |
68016829 |
Construction of roads |
158000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6497465,23.6497465
Longitude : 87.2406377,87.2406377
file name : Image_27052024150000876.png
|
2024-05-27 15:00:00.968515 |
321 |
68018419 |
Construction of roads |
158000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.6500077,23.6500077
Longitude : 87.2557137,87.2557137
file name : Image_18062024125310691.png
|
2024-06-18 12:53:10.799755 |
322 |
68018419 |
Construction of roads |
158000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.6501937,23.6501937
Longitude : 87.2555674,87.2555674
file name : Image_18062024124722304.png
|
2024-06-18 12:47:22.411018 |
323 |
68018419 |
Construction of roads |
158000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.6504357,23.650225
Longitude : 87.2554563,87.2555864
file name : Image_27052024112053918.png
|
2024-05-27 11:20:54.010613 |
324 |
39059028 |
Construction of new drain from SSK School to Dhiren Ruidas house |
317853 |
Construction of new drain from SSK School to Dhiren Ruidas house1 |
Roof laid |
-
latitude : 23.65069972,23.65069972
Longitude : 87.25276505,87.25276505
file name : Image_15092021144416034.png
|
2021-09-15 14:44:16.139128 |
325 |
67989040 |
Construction of toilets in public institutions |
280000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.6460406
Longitude : 87.243694
file name : Image_16062024070215068.png
|
2024-06-16 07:02:15.156924 |
326 |
67989040 |
Construction of toilets in public institutions |
280000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.6466291
Longitude : 87.2442552
file name : Image_14062024142104810.png
|
2024-06-14 14:21:04.931561 |
327 |
67989040 |
Construction of toilets in public institutions |
280000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.6460541
Longitude : 87.2437066
file name : Image_31052024133740584.png
|
2024-05-31 13:37:40.667216 |
328 |
67995397 |
Operation and Maintenance of drinking water supply system |
240305 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 23.6460549
Longitude : 87.2436986
file name : Image_25062024113830127.png
|
2024-06-25 11:38:30.227792 |
329 |
67995397 |
Operation and Maintenance of drinking water supply system |
240305 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.6455673
Longitude : 87.2443146
file name : Image_24062024143607122.png
|
2024-06-24 14:36:07.208522 |
330 |
67995397 |
Operation and Maintenance of drinking water supply system |
240305 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.64344284
Longitude : 87.24202708
file name : Image_23062024065836526.png
|
2024-06-23 06:58:36.608089 |
331 |
67994976 |
Creation of a new source of drinking water |
240305 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.6573946
Longitude : 87.2480717
file name : Image_24062024144112388.png
|
2024-06-24 14:41:12.477283 |
332 |
67994976 |
Creation of a new source of drinking water |
240305 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.6573958
Longitude : 87.2480721
file name : Image_18062024124004018.png
|
2024-06-18 12:40:04.118705 |
333 |
67994976 |
Creation of a new source of drinking water |
240305 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.657396
Longitude : 87.2480721
file name : Image_18062024123603259.png
|
2024-06-18 12:36:03.344731 |
334 |
67994895 |
Augmentation of existing sources of Drinking Water |
240000 |
Augmentation of existing sources of Drinking Water1 |
Roof laid |
-
latitude : 23.6513996
Longitude : 87.2477021
file name : Image_15042024171423362.png
|
2024-04-15 17:14:23.46743 |
335 |
67994895 |
Augmentation of existing sources of Drinking Water |
240000 |
Augmentation of existing sources of Drinking Water1 |
Plinth level |
-
latitude : 23.64345848
Longitude : 87.24208345
file name : Image_02042024112621683.png
|
2024-04-02 11:26:21.776359 |
336 |
67994895 |
Augmentation of existing sources of Drinking Water |
240000 |
Augmentation of existing sources of Drinking Water1 |
Completion of work |
-
latitude : 23.65153189
Longitude : 87.24734203
file name : Image_27032024132349179.png
|
2024-03-27 13:23:49.287294 |
337 |
67996036 |
Creation of a new source of drinking water |
240000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.6473446
Longitude : 87.2432083
file name : Image_03042024171125220.png
|
2024-04-03 17:11:25.334769 |
338 |
67996036 |
Creation of a new source of drinking water |
240000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.6471329
Longitude : 87.2428204
file name : Image_02042024111942982.png
|
2024-04-02 11:19:43.061811 |
339 |
67996036 |
Creation of a new source of drinking water |
240000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.647129
Longitude : 87.2428223
file name : Image_27032024130219490.png
|
2024-03-27 13:02:19.58512 |
340 |
67988268 |
Greywater management system |
230000 |
Greywater management system1 |
Roof laid |
-
latitude : 23.653248
Longitude : 87.2380044
file name : Image_26082024102206036.png
|
2024-08-26 10:22:06.132807 |
341 |
67988268 |
Greywater management system |
230000 |
Greywater management system1 |
Plinth level |
-
latitude : 23.6530626
Longitude : 87.2379151
file name : Image_25082024181147896.png
|
2024-08-25 18:11:47.98646 |
342 |
67988268 |
Greywater management system |
230000 |
Greywater management system1 |
Completion of work |
-
latitude : 23.6530362
Longitude : 87.2379766
file name : Image_25082024132446369.png
|
2024-08-25 13:24:46.453235 |
343 |
34419606 |
Construction of PCC Road from Ashis Kundu House |
200000 |
Construction of PCC Road from Ashis Kundu House1 |
Roof laid |
-
latitude : 23.6489495,23.6489495
Longitude : 87.2401413,87.2401413
file name : Image_20032021124629287.png
|
2021-03-20 12:46:29.015282 |
344 |
34457326 |
Construction of Pucca Drain from Netai Ruidas House |
132332 |
Construction of Pucca Drain from Netai Ruidas House 1 |
Roof laid |
-
latitude : 23.64819167,23.6481929
Longitude : 87.24662842,87.24662673
file name : Image_10022022113815646.png
|
2022-02-10 11:38:15.757506 |
345 |
34457326 |
Construction of Pucca Drain from Netai Ruidas House |
132332 |
Construction of Pucca Drain from Netai Ruidas House 1 |
Plinth level |
-
latitude : 23.64800291,23.64800328
Longitude : 87.24679986,87.24680009
file name : Image_13012022172820974.png
|
2022-01-13 17:28:21.0805 |
346 |
34507917 |
Construction of PCC Road from Naseem House |
175035 |
Construction of PCC Road from Naseem House 1 |
Roof laid |
-
latitude : 23.6559858,23.6559858,23.6559858
Longitude : 87.2363201,87.2363201,87.2363201
file name : Image_09072021155425263.png
|
2021-07-09 15:54:25.378182 |
347 |
34435975 |
Construction of PCC Road at Panchkalitola |
257218 |
Construction of PCC Road at Panchkalitola1 |
Roof laid |
-
latitude : 23.647708333333338,23.647570000000005
Longitude : 87.24581166666667,87.24583666666668
file name : Image_17032021134114719.png
|
2021-03-17 13:41:14.829599 |
348 |
34435975 |
Construction of PCC Road at Panchkalitola |
257218 |
Construction of PCC Road at Panchkalitola1 |
Plinth level |
-
latitude : 23.647630000000003,23.647558333333336
Longitude : 87.24585333333334,87.24582833333334
file name : Image_17032021133842733.png
|
2021-03-17 13:38:42.889836 |
349 |
34435975 |
Construction of PCC Road at Panchkalitola |
257218 |
Construction of PCC Road at Panchkalitola1 |
Completion of work |
-
latitude : 23.647461666666665,23.647661666666668
Longitude : 87.24595833333333,87.24587000000001
file name : Image_16032021154554831.png
|
2021-03-16 15:45:54.96087 |
350 |
67995829 |
Creation of a new source of drinking water |
240000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.64345354
Longitude : 87.24573958
file name : Image_18062024131044672.png
|
2024-06-18 13:10:44.778688 |
351 |
67995829 |
Creation of a new source of drinking water |
240000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.64344763
Longitude : 87.24580406
file name : Image_18062024130501508.png
|
2024-06-18 13:05:01.618586 |
352 |
67995829 |
Creation of a new source of drinking water |
240000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.64347661
Longitude : 87.24569282
file name : Image_18062024130041466.png
|
2024-06-18 13:00:41.574728 |
353 |
54534165 |
CONSTRUCTION OF SHOCO PITE FROM BAZAR AT SANSAD IV |
56269 |
CONSTRUCTION OF SHOCO PITE FROM BAZAR AT SANSAD IV1 |
Roof laid |
-
latitude : 23.6520284
Longitude : 87.2404717
file name : Image_07122021163409221.png
|
2021-12-07 16:34:09.329423 |
354 |
67987904 |
Creation of drainage channel for management of grey water |
214000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.6443496
Longitude : 87.2473547
file name : Image_09092024081632587.png
|
2024-09-09 08:18:12.020646 |
355 |
67987904 |
Creation of drainage channel for management of grey water |
214000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.64483939
Longitude : 87.24741077
file name : Image_05072024154546557.png
|
2024-07-05 15:45:46.661471 |
356 |
68022964 |
Maintenance of school buildings |
127000 |
Maintenance of school buildings1 |
Roof laid |
-
latitude : 23.65018021
Longitude : 87.24577611
file name : Image_23072024112907437.png
|
2024-07-23 11:29:07.538819 |
357 |
68022964 |
Maintenance of school buildings |
127000 |
Maintenance of school buildings1 |
Plinth level |
-
latitude : 23.65430104
Longitude : 87.24034738
file name : Image_19072024150255496.png
|
2024-07-19 15:02:55.583405 |
358 |
68022964 |
Maintenance of school buildings |
127000 |
Maintenance of school buildings1 |
Completion of work |
-
latitude : 23.64354807
Longitude : 87.24198968
file name : Image_15072024104943437.png
|
2024-07-15 10:49:43.537291 |
359 |
67986967 |
Creation of drainage channel for management of grey water |
325000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.64271373
Longitude : 87.23906808
file name : Image_19072024115557501.png
|
2024-07-19 11:55:57.596974 |
360 |
67986967 |
Creation of drainage channel for management of grey water |
325000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.6528511
Longitude : 87.2454491
file name : Image_15072024104631703.png
|
2024-07-15 10:46:31.798733 |
361 |
67986967 |
Creation of drainage channel for management of grey water |
325000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.6537611
Longitude : 87.2441377
file name : Image_05072024161602046.png
|
2024-07-05 16:16:02.154413 |
362 |
67994824 |
Creation of a new source of drinking water |
240000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.65256348
Longitude : 87.24617566
file name : Image_03042024115350212.png
|
2024-04-03 11:53:50.290863 |
363 |
67994824 |
Creation of a new source of drinking water |
240000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.6513024
Longitude : 87.2466883
file name : Image_02042024112444170.png
|
2024-04-02 11:24:44.273295 |
364 |
67994824 |
Creation of a new source of drinking water |
240000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.6510918
Longitude : 87.24519552
file name : Image_27032024130745049.png
|
2024-03-27 13:07:45.145278 |
365 |
67982537 |
Creation of drainage channel for management of grey water |
99900 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.6450767
Longitude : 87.2423528
file name : Image_08072024124509991.png
|
2024-07-08 12:45:10.069835 |
366 |
67982537 |
Creation of drainage channel for management of grey water |
99900 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.6449818
Longitude : 87.2422303
file name : Image_03012024143742633.png
|
2024-01-03 14:37:42.706135 |
367 |
67982537 |
Creation of drainage channel for management of grey water |
99900 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.644895
Longitude : 87.2423182
file name : Image_03012024141915933.png
|
2024-01-03 14:19:15.991191 |
368 |
67982537 |
Creation of drainage channel for management of grey water |
99900 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.6449893
Longitude : 87.2422057
file name : Image_02012024145157856.png
|
2024-01-02 14:51:57.899088 |
369 |
54534111 |
CONSTRUCTION OF DRAIN FROM ECL DRAIN TO BHOSKA ECL AT SANSAD XI |
249710 |
CONSTRUCTION OF DRAIN FROM ECL DRAIN TO BHOSKA ECL AT SANSAD XI1 |
Roof laid |
-
latitude : 23.65034088,23.65034236
Longitude : 87.25190423,87.25193467
file name : Image_10022022165554164.png
|
2022-02-10 16:55:54.297738 |
370 |
54534111 |
CONSTRUCTION OF DRAIN FROM ECL DRAIN TO BHOSKA ECL AT SANSAD XI |
249710 |
CONSTRUCTION OF DRAIN FROM ECL DRAIN TO BHOSKA ECL AT SANSAD XI1 |
Plinth level |
-
latitude : 23.6502723,23.6502723
Longitude : 87.25199172,87.25199172
file name : Image_01022022123909473.png
|
2022-02-01 12:39:09.602852 |
371 |
54526367 |
CONSTRUCTION AND REPAIRING OF ATCHALA AT KHALSA BABAJIN TALA AT SANSAD XVIII |
168442 |
CONSTRUCTION AND REPAIRING OF ATCHALA AT KHALSA BABAJIN TALA AT SANSAD XVIII1 |
Roof laid |
-
latitude : 23.63438554
Longitude : 87.24699362
file name : Image_02032022131416203.png
|
2022-03-02 13:14:16.28524 |
372 |
54526367 |
CONSTRUCTION AND REPAIRING OF ATCHALA AT KHALSA BABAJIN TALA AT SANSAD XVIII |
168442 |
CONSTRUCTION AND REPAIRING OF ATCHALA AT KHALSA BABAJIN TALA AT SANSAD XVIII1 |
Roof laid |
-
latitude : 23.63441136
Longitude : 87.24698411
file name : Image_02032022131455785.png
|
2022-03-02 13:14:55.866343 |
373 |
54526367 |
CONSTRUCTION AND REPAIRING OF ATCHALA AT KHALSA BABAJIN TALA AT SANSAD XVIII |
168442 |
CONSTRUCTION AND REPAIRING OF ATCHALA AT KHALSA BABAJIN TALA AT SANSAD XVIII1 |
Plinth level |
-
latitude : 23.6427743
Longitude : 87.2439516
file name : Image_17022022151920712.png
|
2022-02-17 15:19:20.829466 |
374 |
54534181 |
CONSTRUCTION OF MESSONARY WELL NEAR JAGRITI SANGHA DURGA MANDIR AT SANSAD I |
224104 |
CONSTRUCTION OF MESSONARY WELL NEAR JAGRITI SANGHA DURGA MANDIR AT SANSAD I1 |
Roof laid |
-
latitude : 23.6516109
Longitude : 87.2449777
file name : Image_19052022154747753.png
|
2022-05-19 15:47:47.860118 |
375 |
54534181 |
CONSTRUCTION OF MESSONARY WELL NEAR JAGRITI SANGHA DURGA MANDIR AT SANSAD I |
224104 |
CONSTRUCTION OF MESSONARY WELL NEAR JAGRITI SANGHA DURGA MANDIR AT SANSAD I1 |
Plinth level |
-
latitude : 23.6516055
Longitude : 87.2449919
file name : Image_22032022110826663.png
|
2022-03-22 11:08:26.760989 |
376 |
54534222 |
CONSTRUCTION OF DRAIN WITH SLAB AND ROAD FROM SUKHEN BAURI HOUSE TO RAJU RUIDAS HOUSE |
266428 |
CONSTRUCTION OF DRAIN WITH SLAB AND ROAD FROM SUKHEN BAURI HOUSE TO RAJU RUIDAS HOUSE1 |
Plinth level |
-
latitude : 23.650699,23.650699
Longitude : 87.2484689,87.2484689
file name : Image_22022022132104027.png
|
2022-02-22 13:21:04.130534 |
377 |
54534222 |
CONSTRUCTION OF DRAIN WITH SLAB AND ROAD FROM SUKHEN BAURI HOUSE TO RAJU RUIDAS HOUSE |
266428 |
CONSTRUCTION OF DRAIN WITH SLAB AND ROAD FROM SUKHEN BAURI HOUSE TO RAJU RUIDAS HOUSE1 |
Plinth level |
-
latitude : 23.6506693,23.6506693
Longitude : 87.2484518,87.2484518
file name : Image_22022022132140697.png
|
2022-02-22 13:21:40.793163 |
378 |
54534222 |
CONSTRUCTION OF DRAIN WITH SLAB AND ROAD FROM SUKHEN BAURI HOUSE TO RAJU RUIDAS HOUSE |
266428 |
CONSTRUCTION OF DRAIN WITH SLAB AND ROAD FROM SUKHEN BAURI HOUSE TO RAJU RUIDAS HOUSE1 |
Roof laid |
-
latitude : 23.6506963,23.6506963
Longitude : 87.2484542,87.2484542
file name : Image_02032022125900301.png
|
2022-03-02 12:59:00.406568 |
379 |
48364961 |
CONSTRUCTION OF PUCCaA DRAIN AND SLAB FORM LAKKHI KANTA SOU MONDAL HOUSE TO HIGH DRAIN |
140450 |
CONSTRUCTION OF PUCCaA DRAIN AND SLAB FORM LAKKHI KANTA SOU MONDAL HOUSE TO HIGH DRAIN1 |
Roof laid |
-
latitude : 23.6501201,23.6501201
Longitude : 87.24545287,87.24545287
file name : Image_16112022151506071.png
|
2022-11-16 15:15:06.177096 |
380 |
48364961 |
CONSTRUCTION OF PUCCaA DRAIN AND SLAB FORM LAKKHI KANTA SOU MONDAL HOUSE TO HIGH DRAIN |
140450 |
CONSTRUCTION OF PUCCaA DRAIN AND SLAB FORM LAKKHI KANTA SOU MONDAL HOUSE TO HIGH DRAIN1 |
Plinth level |
-
latitude : 23.64350754,23.64350754
Longitude : 87.24139669,87.24139669
file name : Image_03082022111400867.png
|
2022-08-03 11:14:00.965834 |
381 |
48364961 |
CONSTRUCTION OF PUCCaA DRAIN AND SLAB FORM LAKKHI KANTA SOU MONDAL HOUSE TO HIGH DRAIN |
140450 |
CONSTRUCTION OF PUCCaA DRAIN AND SLAB FORM LAKKHI KANTA SOU MONDAL HOUSE TO HIGH DRAIN1 |
Plinth level |
-
latitude : 23.64350754,23.64350754
Longitude : 87.24139669,87.24139669
file name : Image_03082022111449396.png
|
2022-08-03 11:14:49.512129 |
382 |
64854121 |
Repair of drainage channel |
224636 |
Repair of drainage channel1 |
Roof laid |
-
latitude : 23.64751572,23.6475166
Longitude : 87.24585834,87.24585845
file name : Image_02032023125833472.png
|
2023-03-02 12:58:33.573644 |
383 |
64854121 |
Repair of drainage channel |
224636 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 23.64761342,23.64761342
Longitude : 87.24592004,87.24592004
file name : Image_02022023163236008.png
|
2023-02-02 16:32:36.116825 |
384 |
64854011 |
Construction of toilets in public institutions |
260000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.6475053
Longitude : 87.2433144
file name : Image_27022023101309395.png
|
2023-02-27 10:13:09.489408 |
385 |
64854011 |
Construction of toilets in public institutions |
260000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.6473542
Longitude : 87.2433285
file name : Image_17022023162020009.png
|
2023-02-17 16:20:20.151824 |
386 |
64854011 |
Construction of toilets in public institutions |
260000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.6542
Longitude : 87.2391861
file name : Image_02022023162734345.png
|
2023-02-02 16:27:34.434906 |
387 |
48377110 |
Construction of pucca drain with culvert and pipe line from Mahadeb Das house to Pappu Marwari house |
180061 |
Construction of pucca drain with culvert and pipe line from Mahadeb Das house to Pappu Marwari house1 |
Roof laid |
-
latitude : 23.6494261,23.6494261
Longitude : 87.2506956,87.2506956
file name : Image_30012023142103322.png
|
2023-01-30 14:21:03.40671 |
388 |
48502307 |
CONSTRUCTION OF POCC ROAD FROM ABDUL RAHIM HOUSE TO AKBAR ALI HOUSE |
146894 |
CONSTRUCTION OF POCC ROAD FROM ABDUL RAHIM HOUSE TO AKBAR ALI HOUSE1 |
Roof laid |
-
latitude : 23.65585237,23.65585237
Longitude : 87.23388941,87.23388941
file name : Image_12042023121938111.png
|
2023-04-12 12:19:38.230248 |
389 |
48374862 |
CONSTRUCTION OF PCC ROAD FROM BINOD RAJAK HOUSE TO CHATTU MAJHI HOUSE |
181819 |
CONSTRUCTION OF PCC ROAD FROM BINOD RAJAK HOUSE TO CHATTU MAJHI HOUSE1 |
Roof laid |
-
latitude : 23.646943,23.646943
Longitude : 87.2579721,87.2579721
file name : Image_24112022114642938.png
|
2022-11-24 11:46:43.044638 |
390 |
48374862 |
CONSTRUCTION OF PCC ROAD FROM BINOD RAJAK HOUSE TO CHATTU MAJHI HOUSE |
181819 |
CONSTRUCTION OF PCC ROAD FROM BINOD RAJAK HOUSE TO CHATTU MAJHI HOUSE1 |
Roof laid |
-
latitude : 23.64645218,23.64645223
Longitude : 87.25788484,87.25788485
file name : Image_23112022120112869.png
|
2022-11-23 12:01:12.970391 |
391 |
48116370 |
CONSTRUCTION OF COMMUNITY TOILET AND WATER LINE NEAR SUPER MARKET AT MG ROAD |
230355 |
CONSTRUCTION OF COMMUNITY TOILET AND WATER LINE NEAR SUPER MARKET AT MG ROAD1 |
Roof laid |
-
latitude : 23.6524416,23.6524416
Longitude : 87.2427865,87.2427865
file name : Image_11012023152540168.png
|
2023-01-11 15:25:40.2478 |
392 |
48374279 |
CONSTRUCTION OF DRAIN WITH SLAB FROM PRABAL BAURI HOUSE TO SUKUMAR BAURI HOUSE |
204816 |
CONSTRUCTION OF DRAIN WITH SLAB FROM PRABAL BAURI HOUSE TO SUKUMAR BAURI HOUSE1 |
Roof laid |
-
latitude : 23.6541842,23.6541842
Longitude : 87.2426082,87.2426082
file name : Image_16012023155504607.png
|
2023-01-16 15:55:04.727232 |
393 |
48376105 |
Construction of pcc road from Kali mandir to Krishna Ruidas house |
184400 |
Construction of pcc road from Kali mandir to Krishna Ruidas house1 |
Roof laid |
-
latitude : 23.65148488,23.65148488
Longitude : 87.2528214,87.2528214
file name : Image_28022023124828368.png
|
2023-02-28 12:48:28.461173 |
394 |
68031928 |
Drainage Construction |
230000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.6530407
Longitude : 87.2379733
file name : Image_21082024083012121.png
|
2024-08-21 08:30:12.217217 |
395 |
68031928 |
Drainage Construction |
230000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.6530407
Longitude : 87.2379733
file name : Image_20082024152215616.png
|
2024-08-20 15:22:15.713739 |
396 |
68031928 |
Drainage Construction |
230000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.6530625
Longitude : 87.2379151
file name : Image_20082024150929548.png
|
2024-08-20 15:09:29.638537 |
397 |
68031928 |
Drainage Construction |
230000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.64322392
Longitude : 87.24197793
file name : Image_17082024142750310.png
|
2024-08-17 14:27:50.393064 |