1 |
34527303 |
REPAIRING OF CC ROAD FROM BARTALA TO PRAVAKAR |
150000 |
REPAIRING OF CC ROAD FROM BARTALA TO PRAVAKAR1 |
Roof laid |
-
latitude : 23.83924807,23.83924899
Longitude : 87.30827448,87.30827581
file name : Image_19012021123659623.png
|
2021-01-19 12:36:59.713729 |
2 |
34527303 |
REPAIRING OF CC ROAD FROM BARTALA TO PRAVAKAR |
150000 |
REPAIRING OF CC ROAD FROM BARTALA TO PRAVAKAR1 |
Plinth level |
-
latitude : 23.83926721,23.83926721
Longitude : 87.30826134,87.30826134
file name : Image_19012021123213450.png
|
2021-01-19 12:32:13.552979 |
3 |
34527303 |
REPAIRING OF CC ROAD FROM BARTALA TO PRAVAKAR |
150000 |
REPAIRING OF CC ROAD FROM BARTALA TO PRAVAKAR1 |
Plinth level |
-
latitude : 23.8392442,23.83924418
Longitude : 87.30825554,87.30825549
file name : Image_19012021123228172.png
|
2021-01-19 12:32:28.273633 |
4 |
34527303 |
REPAIRING OF CC ROAD FROM BARTALA TO PRAVAKAR |
150000 |
REPAIRING OF CC ROAD FROM BARTALA TO PRAVAKAR1 |
Plinth level |
-
latitude : 23.8392442,23.83924418
Longitude : 87.30825554,87.30825549
file name : Image_19012021123240238.png
|
2021-01-19 12:32:40.335688 |
5 |
34527303 |
REPAIRING OF CC ROAD FROM BARTALA TO PRAVAKAR |
150000 |
REPAIRING OF CC ROAD FROM BARTALA TO PRAVAKAR1 |
Completion of work |
-
latitude : 23.83925365,23.83924901
Longitude : 87.30827637,87.3082861
file name : Image_19012021120657405.png
|
2021-01-19 12:06:57.482865 |
6 |
34527303 |
REPAIRING OF CC ROAD FROM BARTALA TO PRAVAKAR |
150000 |
REPAIRING OF CC ROAD FROM BARTALA TO PRAVAKAR1 |
Completion of work |
-
latitude : 23.83926298,23.83926477
Longitude : 87.30826551,87.308292
file name : Image_19012021120914622.png
|
2021-01-19 12:09:14.704644 |
7 |
34529495 |
SINKING OF TUBEWELL AT DEMURIA |
120000 |
SINKING OF TUBEWELL AT DEMURIA1 |
Roof laid |
-
latitude : 23.83881833
Longitude : 87.30823758
file name : Image_19012021123833162.png
|
2021-01-19 12:38:33.255457 |
8 |
34529495 |
SINKING OF TUBEWELL AT DEMURIA |
120000 |
SINKING OF TUBEWELL AT DEMURIA1 |
Plinth level |
-
latitude : 23.83883864
Longitude : 87.30825683
file name : Image_19012021123221525.png
|
2021-01-19 12:32:21.623696 |
9 |
34529495 |
SINKING OF TUBEWELL AT DEMURIA |
120000 |
SINKING OF TUBEWELL AT DEMURIA1 |
Plinth level |
-
latitude : 23.83883864
Longitude : 87.30825683
file name : Image_19012021123234324.png
|
2021-01-19 12:32:34.431424 |
10 |
34529495 |
SINKING OF TUBEWELL AT DEMURIA |
120000 |
SINKING OF TUBEWELL AT DEMURIA1 |
Completion of work |
-
latitude : 23.83883764
Longitude : 87.30821931
file name : Image_19012021120704109.png
|
2021-01-19 12:07:04.191909 |
11 |
34541549 |
REPAIRING OF CC ROAD FROM BADIR HOUSE TO MD HOUSE AT BARABON |
300000 |
REPAIRING OF CC ROAD FROM BADIR HOUSE TO MD HOUSE AT BARABON1 |
Roof laid |
-
latitude : 23.83640402,23.83640035
Longitude : 87.28595032,87.28594396
file name : Image_19012021162345838.png
|
2021-01-19 16:23:45.94532 |
12 |
34541549 |
REPAIRING OF CC ROAD FROM BADIR HOUSE TO MD HOUSE AT BARABON |
300000 |
REPAIRING OF CC ROAD FROM BADIR HOUSE TO MD HOUSE AT BARABON1 |
Plinth level |
-
latitude : 23.83643193,23.83642848
Longitude : 87.28595396,87.28594979
file name : Image_19012021160408120.png
|
2021-01-19 16:04:08.19794 |
13 |
34541549 |
REPAIRING OF CC ROAD FROM BADIR HOUSE TO MD HOUSE AT BARABON |
300000 |
REPAIRING OF CC ROAD FROM BADIR HOUSE TO MD HOUSE AT BARABON1 |
Completion of work |
-
latitude : 23.83642445,23.83639183
Longitude : 87.28596542,87.28595461
file name : Image_18012021140215611.png
|
2021-01-18 14:02:15.683204 |
14 |
34552586 |
TUBEWELL PARTS PURCHASE FOR WATER FOR PEOPLE TRUST |
225000 |
TUBEWELL PARTS PURCHASE FOR WATER FOR PEOPLE TRUST1 |
Roof laid |
-
latitude : 23.822369696572423
Longitude : 87.29324885644019
file name : Image_25022022125355965.png
|
2022-02-25 12:53:56.090925 |
15 |
34552586 |
TUBEWELL PARTS PURCHASE FOR WATER FOR PEOPLE TRUST |
225000 |
TUBEWELL PARTS PURCHASE FOR WATER FOR PEOPLE TRUST1 |
Roof laid |
-
latitude : 23.8222716
Longitude : 87.2932742
file name : Image_16082021141352785.png
|
2021-08-16 14:13:52.908769 |
16 |
34552586 |
TUBEWELL PARTS PURCHASE FOR WATER FOR PEOPLE TRUST |
225000 |
TUBEWELL PARTS PURCHASE FOR WATER FOR PEOPLE TRUST1 |
Roof laid |
-
latitude : 23.83877758
Longitude : 87.24715985
file name : Image_28012021124706505.png
|
2021-01-28 12:47:06.613249 |
17 |
34552586 |
TUBEWELL PARTS PURCHASE FOR WATER FOR PEOPLE TRUST |
225000 |
TUBEWELL PARTS PURCHASE FOR WATER FOR PEOPLE TRUST1 |
Plinth level |
-
latitude : 23.8393947
Longitude : 87.2478313
file name : Image_28012021123651146.png
|
2021-01-28 12:36:51.242128 |
18 |
34552586 |
TUBEWELL PARTS PURCHASE FOR WATER FOR PEOPLE TRUST |
225000 |
TUBEWELL PARTS PURCHASE FOR WATER FOR PEOPLE TRUST1 |
Plinth level |
-
latitude : 23.8393947
Longitude : 87.2478313
file name : Image_28012021123700393.png
|
2021-01-28 12:37:00.486793 |
19 |
34552586 |
TUBEWELL PARTS PURCHASE FOR WATER FOR PEOPLE TRUST |
225000 |
TUBEWELL PARTS PURCHASE FOR WATER FOR PEOPLE TRUST1 |
Completion of work |
-
latitude : 23.8387205
Longitude : 87.24712571
file name : Image_27012021123831933.png
|
2021-01-27 12:38:32.020308 |
20 |
39060488 |
COVER DRAIN FROM LAKHI DAS HOUSE TO MORAL PUKUR AT RUPUSPUR |
150000 |
COVER DRAIN FROM LAKHI DAS HOUSE TO MORAL PUKUR AT RUPUSPUR1 |
Plinth level |
-
latitude : 23.82020301,23.82020901
Longitude : 87.29583739,87.29582737
file name : Image_08092021160602631.png
|
2021-09-08 16:06:02.719463 |
21 |
39060488 |
COVER DRAIN FROM LAKHI DAS HOUSE TO MORAL PUKUR AT RUPUSPUR |
150000 |
COVER DRAIN FROM LAKHI DAS HOUSE TO MORAL PUKUR AT RUPUSPUR1 |
Roof laid |
-
latitude : 23.82024559,23.8202458
Longitude : 87.29584281,87.29583981
file name : Image_10092021160253134.png
|
2021-09-10 16:02:53.212757 |
22 |
39060488 |
COVER DRAIN FROM LAKHI DAS HOUSE TO MORAL PUKUR AT RUPUSPUR |
150000 |
COVER DRAIN FROM LAKHI DAS HOUSE TO MORAL PUKUR AT RUPUSPUR1 |
Plinth level |
-
latitude : 23.82020617,23.82020591
Longitude : 87.29577881,87.29577881
file name : Image_02092021113118183.png
|
2021-09-02 11:31:18.277375 |
23 |
39060488 |
COVER DRAIN FROM LAKHI DAS HOUSE TO MORAL PUKUR AT RUPUSPUR |
150000 |
COVER DRAIN FROM LAKHI DAS HOUSE TO MORAL PUKUR AT RUPUSPUR1 |
Completion of work |
-
latitude : 23.8219359,23.82193238
Longitude : 87.2958188,87.29581492
file name : Image_09022021152057103.png
|
2021-02-09 15:20:57.196162 |
24 |
39060600 |
COVER DRAIN AT BARABON VILLAGE PLOT 766 |
400000 |
COVER DRAIN AT BARABON VILLAGE PLOT 7661 |
Roof laid |
-
latitude : 23.8391839,23.83917984
Longitude : 87.28789723,87.28789795
file name : Image_09022021142321489.png
|
2021-02-09 14:23:21.585901 |
25 |
39060600 |
COVER DRAIN AT BARABON VILLAGE PLOT 766 |
400000 |
COVER DRAIN AT BARABON VILLAGE PLOT 7661 |
Plinth level |
-
latitude : 23.83919123,23.83919126
Longitude : 87.28789188,87.28789192
file name : Image_09022021141144195.png
|
2021-02-09 14:11:44.279902 |
26 |
39060600 |
COVER DRAIN AT BARABON VILLAGE PLOT 766 |
400000 |
COVER DRAIN AT BARABON VILLAGE PLOT 7661 |
Completion of work |
-
latitude : 23.83919432,23.83919215
Longitude : 87.28784671,87.28788854
file name : Image_09022021135921890.png
|
2021-02-09 13:59:22.024403 |
27 |
39060675 |
COVER DRAIN AT BARABON VILLAGE PLOT 1043 |
400000 |
COVER DRAIN AT BARABON VILLAGE PLOT 10431 |
Roof laid |
-
latitude : 23.84008827,23.84010829
Longitude : 87.28750079,87.28749312
file name : Image_09022021142604731.png
|
2021-02-09 14:26:04.805825 |
28 |
39060675 |
COVER DRAIN AT BARABON VILLAGE PLOT 1043 |
400000 |
COVER DRAIN AT BARABON VILLAGE PLOT 10431 |
Plinth level |
-
latitude : 23.8401116,23.8401339
Longitude : 87.28747949,87.28749709
file name : Image_09022021140749370.png
|
2021-02-09 14:07:49.472675 |
29 |
39060675 |
COVER DRAIN AT BARABON VILLAGE PLOT 1043 |
400000 |
COVER DRAIN AT BARABON VILLAGE PLOT 10431 |
Completion of work |
-
latitude : 23.84010928,23.84011135
Longitude : 87.28746213,87.28747084
file name : Image_09022021140205994.png
|
2021-02-09 14:02:06.083468 |
30 |
34542025 |
RENOVATION OF DRAINFROM H DAS HOUSE TO PALPUKUR |
100000 |
RENOVATION OF DRAINFROM H DAS HOUSE TO PALPUKUR1 |
Roof laid |
-
latitude : 23.84185456,23.84185429
Longitude : 87.25711299,87.25709848
file name : Image_08092021140018933.png
|
2021-09-08 14:00:19.025578 |
31 |
34542025 |
RENOVATION OF DRAINFROM H DAS HOUSE TO PALPUKUR |
100000 |
RENOVATION OF DRAINFROM H DAS HOUSE TO PALPUKUR1 |
Plinth level |
-
latitude : 23.84187214,23.84187222
Longitude : 87.25710231,87.25710188
file name : Image_08092021133339150.png
|
2021-09-08 13:33:39.29516 |
32 |
34542025 |
RENOVATION OF DRAINFROM H DAS HOUSE TO PALPUKUR |
100000 |
RENOVATION OF DRAINFROM H DAS HOUSE TO PALPUKUR1 |
Completion of work |
-
latitude : 23.84328935,23.84328055
Longitude : 87.25729093,87.25728922
file name : Image_11022021132002301.png
|
2021-02-11 13:20:02.379929 |
33 |
34535127 |
REPAIRING OF CC ROAD FROM PMGSY TO BAURI PARA at Paratia |
200000 |
REPAIRING OF CC ROAD FROM PMGSY TO BAURI PARA at Paratia1 |
Roof laid |
-
latitude : 23.83794215,23.83794097
Longitude : 87.29504883,87.2950543
file name : Image_19012021153221446.png
|
2021-01-19 15:32:21.533293 |
34 |
34535127 |
REPAIRING OF CC ROAD FROM PMGSY TO BAURI PARA at Paratia |
200000 |
REPAIRING OF CC ROAD FROM PMGSY TO BAURI PARA at Paratia1 |
Plinth level |
-
latitude : 23.83798474,23.83798073
Longitude : 87.29504312,87.29504313
file name : Image_19012021152546054.png
|
2021-01-19 15:25:46.138459 |
35 |
34535127 |
REPAIRING OF CC ROAD FROM PMGSY TO BAURI PARA at Paratia |
200000 |
REPAIRING OF CC ROAD FROM PMGSY TO BAURI PARA at Paratia1 |
Completion of work |
-
latitude : 23.83797251,23.83797272,23.83797279
Longitude : 87.29504776,87.2950478,87.29504789
file name : Image_18012021140206144.png
|
2021-01-18 14:02:06.229365 |
36 |
34562589 |
REPAIRING OF CCROAD FROM RAJKUMAR TO RABILAL SHOP at Nichinta |
96801 |
REPAIRING OF CCROAD FROM RAJKUMAR TO RABILAL SHOP at Nichinta1 |
Roof laid |
-
latitude : 23.82642357,23.82643263
Longitude : 87.30599939,87.30600025
file name : Image_19012021135527651.png
|
2021-01-19 13:55:27.751982 |
37 |
34562589 |
REPAIRING OF CCROAD FROM RAJKUMAR TO RABILAL SHOP at Nichinta |
96801 |
REPAIRING OF CCROAD FROM RAJKUMAR TO RABILAL SHOP at Nichinta1 |
Plinth level |
-
latitude : 23.82643429,23.82643442
Longitude : 87.30602149,87.30602157
file name : Image_19012021132624787.png
|
2021-01-19 13:26:24.882923 |
38 |
34562589 |
REPAIRING OF CCROAD FROM RAJKUMAR TO RABILAL SHOP at Nichinta |
96801 |
REPAIRING OF CCROAD FROM RAJKUMAR TO RABILAL SHOP at Nichinta1 |
Completion of work |
-
latitude : 23.82640449,23.82641279
Longitude : 87.30599366,87.30600438
file name : Image_19012021130359285.png
|
2021-01-19 13:03:59.36364 |
39 |
34537210 |
REPAIRING OF CCROAD FROM SARASWATI MANDIR TO KARTIK GARAI |
150000 |
REPAIRING OF CCROAD FROM SARASWATI MANDIR TO KARTIK GARAI1 |
Roof laid |
-
latitude : 23.83463531,23.83463692
Longitude : 87.29038265,87.29039621
file name : Image_19012021155332307.png
|
2021-01-19 15:53:32.403933 |
40 |
34537210 |
REPAIRING OF CCROAD FROM SARASWATI MANDIR TO KARTIK GARAI |
150000 |
REPAIRING OF CCROAD FROM SARASWATI MANDIR TO KARTIK GARAI1 |
Plinth level |
-
latitude : 23.83461946,23.83461942
Longitude : 87.29038905,87.29038898
file name : Image_19012021154819979.png
|
2021-01-19 15:48:20.08255 |
41 |
34537210 |
REPAIRING OF CCROAD FROM SARASWATI MANDIR TO KARTIK GARAI |
150000 |
REPAIRING OF CCROAD FROM SARASWATI MANDIR TO KARTIK GARAI1 |
Plinth level |
-
latitude : 23.8346349,23.83463428
Longitude : 87.29037069,87.29038374
file name : Image_19012021154758629.png
|
2021-01-19 15:47:58.732644 |
42 |
34537210 |
REPAIRING OF CCROAD FROM SARASWATI MANDIR TO KARTIK GARAI |
150000 |
REPAIRING OF CCROAD FROM SARASWATI MANDIR TO KARTIK GARAI1 |
Plinth level |
-
latitude : 23.83461946,23.83461942
Longitude : 87.29038905,87.29038898
file name : Image_19012021154803992.png
|
2021-01-19 15:48:04.091208 |
43 |
34537210 |
REPAIRING OF CCROAD FROM SARASWATI MANDIR TO KARTIK GARAI |
150000 |
REPAIRING OF CCROAD FROM SARASWATI MANDIR TO KARTIK GARAI1 |
Completion of work |
-
latitude : 23.8346327,23.83463617
Longitude : 87.29040156,87.29039749
file name : Image_18012021140210807.png
|
2021-01-18 14:02:10.883328 |
44 |
34536174 |
RENOVATION OF ROAD PROTECTION WALL AT DUISATIN |
100000 |
RENOVATION OF ROAD PROTECTION WALL AT DUISATIN1 |
Roof laid |
-
latitude : 23.84430831
Longitude : 87.29394031
file name : Image_28012021123647554.png
|
2021-01-28 12:36:47.660509 |
45 |
34536174 |
RENOVATION OF ROAD PROTECTION WALL AT DUISATIN |
100000 |
RENOVATION OF ROAD PROTECTION WALL AT DUISATIN1 |
Plinth level |
-
latitude : 23.84430762
Longitude : 87.29389801
file name : Image_19012021163909886.png
|
2021-01-19 16:39:09.990148 |
46 |
34536174 |
RENOVATION OF ROAD PROTECTION WALL AT DUISATIN |
100000 |
RENOVATION OF ROAD PROTECTION WALL AT DUISATIN1 |
Plinth level |
-
latitude : 23.84429975
Longitude : 87.29400582
file name : Image_27012021113239360.png
|
2021-01-27 11:32:39.466696 |
47 |
34536174 |
RENOVATION OF ROAD PROTECTION WALL AT DUISATIN |
100000 |
RENOVATION OF ROAD PROTECTION WALL AT DUISATIN1 |
Completion of work |
-
latitude : 23.84430145
Longitude : 87.29389821
file name : Image_19012021163431315.png
|
2021-01-19 16:34:31.424384 |
48 |
39060430 |
COVER DRAIN FROM ICDS CENTRE TO SUKUMAR HOUSE AT BARGHATA |
200000 |
COVER DRAIN FROM ICDS CENTRE TO SUKUMAR HOUSE AT BARGHATA1 |
Roof laid |
-
latitude : 23.81741724,23.81740877
Longitude : 87.30658202,87.30659146
file name : Image_09022021155640204.png
|
2021-02-09 15:56:40.321023 |
49 |
39060430 |
COVER DRAIN FROM ICDS CENTRE TO SUKUMAR HOUSE AT BARGHATA |
200000 |
COVER DRAIN FROM ICDS CENTRE TO SUKUMAR HOUSE AT BARGHATA1 |
Plinth level |
-
latitude : 23.81742434,23.81742438
Longitude : 87.30658867,87.30658851
file name : Image_09022021154851614.png
|
2021-02-09 15:48:51.729531 |
50 |
39060430 |
COVER DRAIN FROM ICDS CENTRE TO SUKUMAR HOUSE AT BARGHATA |
200000 |
COVER DRAIN FROM ICDS CENTRE TO SUKUMAR HOUSE AT BARGHATA1 |
Completion of work |
-
latitude : 23.81740232,23.81740535
Longitude : 87.3065835,87.30657136
file name : Image_09022021153438833.png
|
2021-02-09 15:34:38.933175 |
51 |
39060430 |
COVER DRAIN FROM ICDS CENTRE TO SUKUMAR HOUSE AT BARGHATA |
200000 |
COVER DRAIN FROM ICDS CENTRE TO SUKUMAR HOUSE AT BARGHATA1 |
Completion of work |
-
latitude : 23.81743268,23.81743262
Longitude : 87.30657597,87.30657567
file name : Image_09022021153444116.png
|
2021-02-09 15:34:44.224942 |
52 |
39060430 |
COVER DRAIN FROM ICDS CENTRE TO SUKUMAR HOUSE AT BARGHATA |
200000 |
COVER DRAIN FROM ICDS CENTRE TO SUKUMAR HOUSE AT BARGHATA1 |
Completion of work |
-
latitude : 23.81743268,23.81743262
Longitude : 87.30657597,87.30657567
file name : Image_09022021153503453.png
|
2021-02-09 15:35:03.55872 |
53 |
34531437 |
RENOVATION OF SECHNALA FROM BANPUKUR TO DOBAGAN |
100000 |
RENOVATION OF SECHNALA FROM BANPUKUR TO DOBAGAN1 |
Roof laid |
-
latitude : 23.86623035
Longitude : 87.30283885
file name : Image_05042021131613146.png
|
2021-04-05 13:16:13.231245 |
54 |
34531437 |
RENOVATION OF SECHNALA FROM BANPUKUR TO DOBAGAN |
100000 |
RENOVATION OF SECHNALA FROM BANPUKUR TO DOBAGAN1 |
Plinth level |
-
latitude : 23.86621553
Longitude : 87.30285706
file name : Image_09032021114157479.png
|
2021-03-09 11:41:57.581508 |
55 |
34531437 |
RENOVATION OF SECHNALA FROM BANPUKUR TO DOBAGAN |
100000 |
RENOVATION OF SECHNALA FROM BANPUKUR TO DOBAGAN1 |
Completion of work |
-
latitude : 23.86623052
Longitude : 87.30281907
file name : Image_11022021123325867.png
|
2021-02-11 12:33:25.980777 |
56 |
34531437 |
RENOVATION OF SECHNALA FROM BANPUKUR TO DOBAGAN |
100000 |
RENOVATION OF SECHNALA FROM BANPUKUR TO DOBAGAN1 |
Completion of work |
-
latitude : 23.86624219
Longitude : 87.30282209
file name : Image_11022021123422682.png
|
2021-02-11 12:34:22.799454 |
57 |
34547618 |
PURCHASE OF TUBEWELL PARTS FOR ALL SANSAD |
300000 |
PURCHASE OF TUBEWELL PARTS FOR ALL SANSAD1 |
Completion of work |
-
latitude : 23.8222716
Longitude : 87.2932712
file name : Image_10082021143014865.png
|
2021-08-10 14:30:14.956092 |
58 |
34547618 |
PURCHASE OF TUBEWELL PARTS FOR ALL SANSAD |
300000 |
PURCHASE OF TUBEWELL PARTS FOR ALL SANSAD1 |
Completion of work |
-
latitude : 23.8222726
Longitude : 87.2932737
file name : Image_10082021143020094.png
|
2021-08-10 14:30:20.186796 |
59 |
34547618 |
PURCHASE OF TUBEWELL PARTS FOR ALL SANSAD |
300000 |
PURCHASE OF TUBEWELL PARTS FOR ALL SANSAD1 |
Completion of work |
-
latitude : 23.8222683
Longitude : 87.2932657
file name : Image_10082021143449586.png
|
2021-08-10 14:34:49.689842 |
60 |
34535515 |
REPAIRING OF CCROAD PMGSY TO SHAL RIVER |
490000 |
REPAIRING OF CCROAD PMGSY TO SHAL RIVER1 |
Roof laid |
-
latitude : 23.838562360033393,23.838590062223375,23.8385446742177
Longitude : 87.28930869139731,87.28929645381868,87.28928312659264
file name : Image_09122021151151682.png
|
2021-12-09 15:11:51.770503 |
61 |
34535515 |
REPAIRING OF CCROAD PMGSY TO SHAL RIVER |
490000 |
REPAIRING OF CCROAD PMGSY TO SHAL RIVER1 |
Roof laid |
-
latitude : 23.83856692817062,23.83855896536261
Longitude : 87.28928765282035,87.28929167613387
file name : Image_09122021151155252.png
|
2021-12-09 15:11:55.356242 |
62 |
34535515 |
REPAIRING OF CCROAD PMGSY TO SHAL RIVER |
490000 |
REPAIRING OF CCROAD PMGSY TO SHAL RIVER1 |
Plinth level |
-
latitude : 23.83855481632054,23.8385076681152
Longitude : 87.28935487568378,87.28932688012719
file name : Image_06122021145232764.png
|
2021-12-06 14:52:32.877059 |
63 |
34535515 |
REPAIRING OF CCROAD PMGSY TO SHAL RIVER |
490000 |
REPAIRING OF CCROAD PMGSY TO SHAL RIVER1 |
Roof laid |
-
latitude : 23.838526736944914,23.838537759147584
Longitude : 87.28926275856793,87.28929997421801
file name : Image_06122021153232831.png
|
2021-12-06 15:32:32.942348 |
64 |
34535515 |
REPAIRING OF CCROAD PMGSY TO SHAL RIVER |
490000 |
REPAIRING OF CCROAD PMGSY TO SHAL RIVER1 |
Completion of work |
-
latitude : 23.83858552,23.83858128
Longitude : 87.28933139,87.28932674
file name : Image_29102021145721989.png
|
2021-10-29 14:57:22.114124 |
65 |
34539128 |
RENOVATION OF DRAIN FROM KABUL HOUSE TO SALLA |
100000 |
RENOVATION OF DRAIN FROM KABUL HOUSE TO SALLA1 |
Roof laid |
-
latitude : 23.82865549
Longitude : 87.29670554
file name : Image_20092021153450795.png
|
2021-09-20 15:34:50.900647 |
66 |
34539128 |
RENOVATION OF DRAIN FROM KABUL HOUSE TO SALLA |
100000 |
RENOVATION OF DRAIN FROM KABUL HOUSE TO SALLA1 |
Plinth level |
-
latitude : 23.82864148
Longitude : 87.29669466
file name : Image_08092021113520199.png
|
2021-09-08 11:35:20.292933 |
67 |
34539128 |
RENOVATION OF DRAIN FROM KABUL HOUSE TO SALLA |
100000 |
RENOVATION OF DRAIN FROM KABUL HOUSE TO SALLA1 |
Completion of work |
-
latitude : 23.82865457
Longitude : 87.29669613
file name : Image_20082021112724272.png
|
2021-08-20 11:27:24.366097 |
68 |
34539128 |
RENOVATION OF DRAIN FROM KABUL HOUSE TO SALLA |
100000 |
RENOVATION OF DRAIN FROM KABUL HOUSE TO SALLA1 |
Completion of work |
-
latitude : 23.82865368
Longitude : 87.29670482
file name : Image_20082021113200611.png
|
2021-08-20 11:32:00.700603 |
69 |
34543891 |
RENOVATION OF DRAIN NEAR TELIPUKUR AT BARABON |
150000 |
RENOVATION OF DRAIN NEAR TELIPUKUR AT BARABON1 |
Roof laid |
-
latitude : 23.84051748
Longitude : 87.28762749
file name : Image_08092021112008385.png
|
2021-09-08 11:20:08.529156 |
70 |
34543891 |
RENOVATION OF DRAIN NEAR TELIPUKUR AT BARABON |
150000 |
RENOVATION OF DRAIN NEAR TELIPUKUR AT BARABON1 |
Roof laid |
-
latitude : 23.84052447
Longitude : 87.28765302
file name : Image_08092021112013662.png
|
2021-09-08 11:20:13.75366 |
71 |
34543891 |
RENOVATION OF DRAIN NEAR TELIPUKUR AT BARABON |
150000 |
RENOVATION OF DRAIN NEAR TELIPUKUR AT BARABON1 |
Completion of work |
-
latitude : 23.84045558
Longitude : 87.28778704
file name : Image_27082021115848632.png
|
2021-08-27 11:58:48.738939 |
72 |
39056874 |
SECHNALA FROM BARDHAN PUKUR TO TALPUKUR AT KARIDHYA |
400000 |
SECHNALA FROM BARDHAN PUKUR TO TALPUKUR AT KARIDHYA1 |
Roof laid |
-
latitude : 23.84443019,23.84442897
Longitude : 87.29406827,87.29407381
file name : Image_08092021111411029.png
|
2021-09-08 11:14:11.126401 |
73 |
39056874 |
SECHNALA FROM BARDHAN PUKUR TO TALPUKUR AT KARIDHYA |
400000 |
SECHNALA FROM BARDHAN PUKUR TO TALPUKUR AT KARIDHYA1 |
Plinth level |
-
latitude : 23.84442186,23.84443768
Longitude : 87.2941087,87.29411714
file name : Image_20082021115213342.png
|
2021-08-20 11:52:13.454175 |
74 |
39056874 |
SECHNALA FROM BARDHAN PUKUR TO TALPUKUR AT KARIDHYA |
400000 |
SECHNALA FROM BARDHAN PUKUR TO TALPUKUR AT KARIDHYA1 |
Completion of work |
-
latitude : 23.84443773,23.84444394
Longitude : 87.29410945,87.29411983
file name : Image_19082021120544727.png
|
2021-08-19 12:05:44.817025 |
75 |
34555913 |
SUBMERSIBLE PUMP AT GP OFFICE |
400000 |
SUBMERSIBLE PUMP AT GP OFFICE1 |
Roof laid |
-
latitude : 23.82235851
Longitude : 87.29334363
file name : Image_17082021135312635.png
|
2021-08-17 13:53:12.74496 |
76 |
34555913 |
SUBMERSIBLE PUMP AT GP OFFICE |
400000 |
SUBMERSIBLE PUMP AT GP OFFICE1 |
Roof laid |
-
latitude : 23.82235486
Longitude : 87.29333103
file name : Image_17082021135316567.png
|
2021-08-17 13:53:16.672074 |
77 |
34555913 |
SUBMERSIBLE PUMP AT GP OFFICE |
400000 |
SUBMERSIBLE PUMP AT GP OFFICE1 |
Roof laid |
-
latitude : 23.82238193
Longitude : 87.2933536
file name : Image_17082021140433705.png
|
2021-08-17 14:04:33.799652 |
78 |
34555913 |
SUBMERSIBLE PUMP AT GP OFFICE |
400000 |
SUBMERSIBLE PUMP AT GP OFFICE1 |
Plinth level |
-
latitude : 23.822269
Longitude : 87.2932688
file name : Image_16082021140733048.png
|
2021-08-16 14:07:33.161757 |
79 |
34555913 |
SUBMERSIBLE PUMP AT GP OFFICE |
400000 |
SUBMERSIBLE PUMP AT GP OFFICE1 |
Completion of work |
-
latitude : 23.8222719
Longitude : 87.2932726
file name : Image_10082021130036213.png
|
2021-08-10 13:00:36.335812 |
80 |
39060537 |
SINKING OF SUBMERSIBLE NEAR BOLTALA AT RUPUSPUR |
150000 |
SINKING OF SUBMERSIBLE NEAR BOLTALA AT RUPUSPUR1 |
Roof laid |
-
latitude : 23.821550155989826
Longitude : 87.2949149273336
file name : Image_22122021135456496.png
|
2021-12-22 13:54:56.625607 |
81 |
39060537 |
SINKING OF SUBMERSIBLE NEAR BOLTALA AT RUPUSPUR |
150000 |
SINKING OF SUBMERSIBLE NEAR BOLTALA AT RUPUSPUR1 |
Plinth level |
-
latitude : 23.821559962816536
Longitude : 87.29494107887149
file name : Image_10122021142747868.png
|
2021-12-10 14:27:47.971738 |
82 |
39060537 |
SINKING OF SUBMERSIBLE NEAR BOLTALA AT RUPUSPUR |
150000 |
SINKING OF SUBMERSIBLE NEAR BOLTALA AT RUPUSPUR1 |
Plinth level |
-
latitude : 23.821557783521712
Longitude : 87.29492649435997
file name : Image_10122021142751349.png
|
2021-12-10 14:27:51.461009 |
83 |
39060537 |
SINKING OF SUBMERSIBLE NEAR BOLTALA AT RUPUSPUR |
150000 |
SINKING OF SUBMERSIBLE NEAR BOLTALA AT RUPUSPUR1 |
Completion of work |
-
latitude : 23.82155709
Longitude : 87.29487128
file name : Image_30082021153917713.png
|
2021-08-30 15:39:17.801943 |
84 |
39060742 |
SINKING OF SUBMERSIBLE NEAR VIVEKANANDA CLUB AT CHORA |
200000 |
SINKING OF SUBMERSIBLE NEAR VIVEKANANDA CLUB AT CHORA1 |
Roof laid |
-
latitude : 23.822887069545686
Longitude : 87.30886501260102
file name : Image_22122021142817788.png
|
2021-12-22 14:28:17.88886 |
85 |
39060742 |
SINKING OF SUBMERSIBLE NEAR VIVEKANANDA CLUB AT CHORA |
200000 |
SINKING OF SUBMERSIBLE NEAR VIVEKANANDA CLUB AT CHORA1 |
Plinth level |
-
latitude : 23.82282536
Longitude : 87.30888303
file name : Image_08102021110912147.png
|
2021-10-08 11:09:12.237514 |
86 |
39060742 |
SINKING OF SUBMERSIBLE NEAR VIVEKANANDA CLUB AT CHORA |
200000 |
SINKING OF SUBMERSIBLE NEAR VIVEKANANDA CLUB AT CHORA1 |
Completion of work |
-
latitude : 23.82286997
Longitude : 87.30884938
file name : Image_02092021112932245.png
|
2021-09-02 11:29:32.341115 |
87 |
39060742 |
SINKING OF SUBMERSIBLE NEAR VIVEKANANDA CLUB AT CHORA |
200000 |
SINKING OF SUBMERSIBLE NEAR VIVEKANANDA CLUB AT CHORA1 |
Completion of work |
-
latitude : 23.82287498
Longitude : 87.30886963
file name : Image_02092021112935945.png
|
2021-09-02 11:29:36.04039 |
88 |
34559532 |
PURCHASE OF HUME PIPE FOR SHAL RIVER |
300000 |
PURCHASE OF HUME PIPE FOR SHAL RIVER1 |
Roof laid |
-
latitude : 23.83497124,23.83497132
Longitude : 87.30882643,87.30881574
file name : Image_17082021114238883.png
|
2021-08-17 11:42:38.986646 |
89 |
34559532 |
PURCHASE OF HUME PIPE FOR SHAL RIVER |
300000 |
PURCHASE OF HUME PIPE FOR SHAL RIVER1 |
Plinth level |
-
latitude : 23.83500114,23.83500116
Longitude : 87.30873276,87.30873275
file name : Image_16082021113106449.png
|
2021-08-16 11:31:06.541958 |
90 |
34559532 |
PURCHASE OF HUME PIPE FOR SHAL RIVER |
300000 |
PURCHASE OF HUME PIPE FOR SHAL RIVER1 |
Completion of work |
-
latitude : 23.83498427,23.834983
Longitude : 87.30876802,87.30877519
file name : Image_10082021130030022.png
|
2021-08-10 13:00:30.153897 |
91 |
34547618 |
PURCHASE OF TUBEWELL PARTS FOR ALL SANSAD |
300000 |
PURCHASE OF TUBEWELL PARTS FOR ALL SANSAD1 |
Roof laid |
-
latitude : 23.8222933
Longitude : 87.2931917
file name : Image_09122021143749760.png
|
2021-12-09 14:37:49.87332 |
92 |
34547618 |
PURCHASE OF TUBEWELL PARTS FOR ALL SANSAD |
300000 |
PURCHASE OF TUBEWELL PARTS FOR ALL SANSAD1 |
Roof laid |
-
latitude : 23.8222923
Longitude : 87.2931947
file name : Image_09122021143753156.png
|
2021-12-09 14:37:53.249542 |
93 |
34547618 |
PURCHASE OF TUBEWELL PARTS FOR ALL SANSAD |
300000 |
PURCHASE OF TUBEWELL PARTS FOR ALL SANSAD1 |
Roof laid |
-
latitude : 23.8222921
Longitude : 87.2931954
file name : Image_09122021143906448.png
|
2021-12-09 14:39:06.562917 |
94 |
34547618 |
PURCHASE OF TUBEWELL PARTS FOR ALL SANSAD |
300000 |
PURCHASE OF TUBEWELL PARTS FOR ALL SANSAD1 |
Roof laid |
-
latitude : 23.82231626
Longitude : 87.29322767
file name : Image_17082021141056154.png
|
2021-08-17 14:10:56.249986 |
95 |
48711309 |
WATER TESTING CHARGES OF EXISTING TUBEWELL WITHIN GP AREA |
70000 |
WATER TESTING CHARGES OF EXISTING TUBEWELL WITHIN GP AREA1 |
Roof laid |
-
latitude : 23.8222684
Longitude : 87.2932537
file name : Image_17052022122600214.png
|
2022-05-17 12:26:00.303013 |
96 |
48711309 |
WATER TESTING CHARGES OF EXISTING TUBEWELL WITHIN GP AREA |
70000 |
WATER TESTING CHARGES OF EXISTING TUBEWELL WITHIN GP AREA1 |
Completion of work |
-
latitude : 23.8222725
Longitude : 87.2931924
file name : Image_15022022122933832.png
|
2022-02-15 12:29:33.938295 |
97 |
39056225 |
ODF MAINTAINANCE AT ALL SANSAD |
223401 |
ODF MAINTAINANCE AT ALL SANSAD1 |
Completion of work |
-
latitude : 23.8222697
Longitude : 87.2932075
file name : Image_20012022115839106.png
|
2022-01-20 11:58:39.224793 |
98 |
39056128 |
30 nos vat in all sansad village |
300000 |
30 nos vat in all sansad village1 |
Plinth level |
-
latitude : 23.827363676391542
Longitude : 87.30551878921688
file name : Image_20022022123336371.png
|
2022-02-20 12:33:36.503421 |
99 |
39056128 |
30 nos vat in all sansad village |
300000 |
30 nos vat in all sansad village1 |
Plinth level |
-
latitude : 23.82728706
Longitude : 87.30551075
file name : Image_05042021131620212.png
|
2021-04-05 13:16:20.293404 |
100 |
39056128 |
30 nos vat in all sansad village |
300000 |
30 nos vat in all sansad village1 |
Plinth level |
-
latitude : 23.82735802
Longitude : 87.305554
file name : Image_07042021112412477.png
|
2021-04-07 11:24:12.589237 |
101 |
34542312 |
REPAIRING OF CC ROAD FROM MD HOUSE TO RASID HOUSE AT BARABON |
156600 |
REPAIRING OF CC ROAD FROM MD HOUSE TO RASID HOUSE AT BARABON1 |
Roof laid |
-
latitude : 23.8378992,23.8379001
Longitude : 87.2852722,87.2852721
file name : Image_21032022150951367.png
|
2022-03-21 15:09:51.458389 |
102 |
34542312 |
REPAIRING OF CC ROAD FROM MD HOUSE TO RASID HOUSE AT BARABON |
156600 |
REPAIRING OF CC ROAD FROM MD HOUSE TO RASID HOUSE AT BARABON1 |
Plinth level |
-
latitude : 23.8377058,23.8377449
Longitude : 87.2851508,87.285176
file name : Image_15022022154849814.png
|
2022-02-15 15:48:49.922654 |
103 |
34542312 |
REPAIRING OF CC ROAD FROM MD HOUSE TO RASID HOUSE AT BARABON |
156600 |
REPAIRING OF CC ROAD FROM MD HOUSE TO RASID HOUSE AT BARABON1 |
Completion of work |
-
latitude : 23.8376482,23.8376634
Longitude : 87.2851613,87.285169
file name : Image_20012022155828827.png
|
2022-01-20 15:58:28.948886 |
104 |
39053803 |
SUBMERSIBLE PUMP WITH PIPE LINE TOPWATER AT DEMURIA |
400000 |
SUBMERSIBLE PUMP WITH PIPE LINE TOPWATER AT DEMURIA1 |
Roof laid |
-
latitude : 23.843986289575696,23.844003723934293
Longitude : 87.30889149941504,87.30891052633524
file name : Image_19012022154320863.png
|
2022-01-19 15:43:20.987018 |
105 |
39053803 |
SUBMERSIBLE PUMP WITH PIPE LINE TOPWATER AT DEMURIA |
400000 |
SUBMERSIBLE PUMP WITH PIPE LINE TOPWATER AT DEMURIA1 |
Roof laid |
-
latitude : 23.844052338972688,23.84403540752828
Longitude : 87.30884548276663,87.30880055576563
file name : Image_10122021144749933.png
|
2021-12-10 14:47:50.044281 |
106 |
39053803 |
SUBMERSIBLE PUMP WITH PIPE LINE TOPWATER AT DEMURIA |
400000 |
SUBMERSIBLE PUMP WITH PIPE LINE TOPWATER AT DEMURIA1 |
Roof laid |
-
latitude : 23.84404102,23.84404293
Longitude : 87.30893502,87.30892239
file name : Image_23092021115007642.png
|
2021-09-23 11:50:07.758874 |
107 |
39053803 |
SUBMERSIBLE PUMP WITH PIPE LINE TOPWATER AT DEMURIA |
400000 |
SUBMERSIBLE PUMP WITH PIPE LINE TOPWATER AT DEMURIA1 |
Roof laid |
-
latitude : 23.84404745,23.84404833,23.84404831
Longitude : 87.30886986,87.30886428,87.30886367
file name : Image_23092021115026043.png
|
2021-09-23 11:50:26.157671 |
108 |
39053803 |
SUBMERSIBLE PUMP WITH PIPE LINE TOPWATER AT DEMURIA |
400000 |
SUBMERSIBLE PUMP WITH PIPE LINE TOPWATER AT DEMURIA1 |
Plinth level |
-
latitude : 23.82151881,23.82151838
Longitude : 87.29495322,87.29495687
file name : Image_30082021154142720.png
|
2021-08-30 15:41:42.813694 |
109 |
39053803 |
SUBMERSIBLE PUMP WITH PIPE LINE TOPWATER AT DEMURIA |
400000 |
SUBMERSIBLE PUMP WITH PIPE LINE TOPWATER AT DEMURIA1 |
Completion of work |
-
latitude : 23.8575242,23.83875185,23.83875137
Longitude : 87.3061174,87.30826618,87.30826648
file name : Image_10082021130023922.png
|
2021-08-10 13:00:24.050358 |
110 |
48668460 |
PARTS PURCHASE FOR ALL EXISTING TUBEWELL WITHIN GP AREA |
350000 |
PARTS PURCHASE FOR ALL EXISTING TUBEWELL WITHIN GP AREA1 |
Plinth level |
-
latitude : 23.8222737
Longitude : 87.2931757
file name : Image_04042022122717488.png
|
2022-04-04 12:27:17.598216 |
111 |
48668460 |
PARTS PURCHASE FOR ALL EXISTING TUBEWELL WITHIN GP AREA |
350000 |
PARTS PURCHASE FOR ALL EXISTING TUBEWELL WITHIN GP AREA1 |
Completion of work |
-
latitude : 23.8222531
Longitude : 87.2932024
file name : Image_09032022112007974.png
|
2022-03-09 11:20:08.065366 |
112 |
48668460 |
PARTS PURCHASE FOR ALL EXISTING TUBEWELL WITHIN GP AREA |
350000 |
PARTS PURCHASE FOR ALL EXISTING TUBEWELL WITHIN GP AREA1 |
Completion of work |
-
latitude : 23.8222641
Longitude : 87.293182
file name : Image_09032022112203706.png
|
2022-03-09 11:22:03.799409 |
113 |
48890522 |
RENOVATION OF CONCRETE ROAD FROM BIREN SHIL HOUSE TO UTTAM SEN HOUSE AT PARATIA |
200000 |
RENOVATION OF CONCRETE ROAD FROM BIREN SHIL HOUSE TO UTTAM SEN HOUSE AT PARATIA1 |
Completion of work |
-
latitude : 23.83729367516935,23.83728223387152
Longitude : 87.2961409483105,87.29614773765206
file name : Image_29042022152928504.png
|
2022-04-29 15:29:28.639323 |
114 |
48660651 |
NEW RIDGEBORE TIUBEWELL NEAR NAYANBALA SOW HOUSE AT NINGA |
80000 |
NEW RIDGEBORE TIUBEWELL NEAR NAYANBALA SOW HOUSE AT NINGA1 |
Plinth level |
-
latitude : 23.82814579177648
Longitude : 87.2977105434984
file name : Image_05042022134817211.png
|
2022-04-05 13:48:17.328248 |
115 |
48660651 |
NEW RIDGEBORE TIUBEWELL NEAR NAYANBALA SOW HOUSE AT NINGA |
80000 |
NEW RIDGEBORE TIUBEWELL NEAR NAYANBALA SOW HOUSE AT NINGA1 |
Completion of work |
-
latitude : 23.828156143426895
Longitude : 87.29770467616618
file name : Image_22032022142923218.png
|
2022-03-22 14:29:23.32692 |
116 |
48661053 |
NEW RIDGEBORE TUBEWELL BESIDE PMGSY ROAD AT AJHIDPUR |
80000 |
NEW RIDGEBORE TUBEWELL BESIDE PMGSY ROAD AT AJHIDPUR1 |
Completion of work |
-
latitude : 23.845262224785984
Longitude : 87.25719854235649
file name : Image_21032022164034803.png
|
2022-03-21 16:40:34.950014 |
117 |
48661301 |
NEW RIDGEBORE TUBEWELL NEAAR JITEN BAURI HOUSE AT CHUAGARH |
80000 |
NEW RIDGEBORE TUBEWELL NEAAR JITEN BAURI HOUSE AT CHUAGARH1 |
Plinth level |
-
latitude : 23.8213640358299
Longitude : 87.29328347370028
file name : Image_08042022145245563.png
|
2022-04-08 14:52:45.688072 |
118 |
48661301 |
NEW RIDGEBORE TUBEWELL NEAAR JITEN BAURI HOUSE AT CHUAGARH |
80000 |
NEW RIDGEBORE TUBEWELL NEAAR JITEN BAURI HOUSE AT CHUAGARH1 |
Completion of work |
-
latitude : 23.821220537647605
Longitude : 87.29309345595539
file name : Image_22032022144802225.png
|
2022-03-22 14:48:02.346519 |
119 |
48661097 |
NEW RIDGEBORE TUBEWELL NEAR NITYA BAURI HOUSE AT JAHIDPUR |
80000 |
NEW RIDGEBORE TUBEWELL NEAR NITYA BAURI HOUSE AT JAHIDPUR1 |
Completion of work |
-
latitude : 23.838158436119556
Longitude : 87.25551662966609
file name : Image_21032022164029653.png
|
2022-03-21 16:40:29.779071 |
120 |
48890816 |
CONSTRUCTION OF CC ROAD FROM MATHURA BAGDI HOUSE TO RIVER BANK AT CHARIGRAM |
143400 |
CONSTRUCTION OF CC ROAD FROM MATHURA BAGDI HOUSE TO RIVER BANK AT CHARIGRAM |
Plinth level |
-
latitude : 23.824137607589364,23.82412013132125
Longitude : 87.30877993628383,87.30881161987782
file name : Image_28032022155726160.png
|
2022-03-28 15:57:26.256534 |
121 |
48890816 |
CONSTRUCTION OF CC ROAD FROM MATHURA BAGDI HOUSE TO RIVER BANK AT CHARIGRAM |
143400 |
CONSTRUCTION OF CC ROAD FROM MATHURA BAGDI HOUSE TO RIVER BANK AT CHARIGRAM |
Completion of work |
-
latitude : 23.8245942,23.8245945
Longitude : 87.3103398,87.3103375
file name : Image_28032022120256326.png
|
2022-03-28 12:02:56.431818 |
122 |
48890146 |
RENOVATION OF CC ROAD FROM LAXMIKANTA GHOSH HOUSE TO MANE GORE AT NICHINTA |
150000 |
RENOVATION OF CC ROAD FROM LAXMIKANTA GHOSH HOUSE TO MANE GORE AT NICHINTA1 |
Plinth level |
-
latitude : 23.82574580144137,23.825745130889118
Longitude : 87.30498645454645,87.30500020086765
file name : Image_28032022160905299.png
|
2022-03-28 16:09:05.381532 |
123 |
48890146 |
RENOVATION OF CC ROAD FROM LAXMIKANTA GHOSH HOUSE TO MANE GORE AT NICHINTA |
150000 |
RENOVATION OF CC ROAD FROM LAXMIKANTA GHOSH HOUSE TO MANE GORE AT NICHINTA1 |
Plinth level |
-
latitude : 23.825731426477432,23.825769228860736
Longitude : 87.30496441014111,87.30498427525163
file name : Image_28032022160912856.png
|
2022-03-28 16:09:12.960984 |
124 |
48890146 |
RENOVATION OF CC ROAD FROM LAXMIKANTA GHOSH HOUSE TO MANE GORE AT NICHINTA |
150000 |
RENOVATION OF CC ROAD FROM LAXMIKANTA GHOSH HOUSE TO MANE GORE AT NICHINTA1 |
Completion of work |
-
latitude : 23.825768851675093,23.825809923000634
Longitude : 87.30502207763493,87.30499508790672
file name : Image_28032022114802825.png
|
2022-03-28 11:48:02.943034 |
125 |
48660537 |
NEW RIDGEBORE TUBEWELL NEAR ASWINI MONDAL HOUSE AT ANANDANAGAR |
80000 |
NEW RIDGEBORE TUBEWELL NEAR ASWINI MONDAL HOUSE AT ANANDANAGAR1 |
Roof laid |
-
latitude : 23.864155034534633
Longitude : 87.30690456926823
file name : Image_05042022120610628.png
|
2022-04-05 12:06:10.706596 |
126 |
48660537 |
NEW RIDGEBORE TUBEWELL NEAR ASWINI MONDAL HOUSE AT ANANDANAGAR |
80000 |
NEW RIDGEBORE TUBEWELL NEAR ASWINI MONDAL HOUSE AT ANANDANAGAR1 |
Plinth level |
-
latitude : 23.864167775027454
Longitude : 87.3068469017744
file name : Image_05042022114811147.png
|
2022-04-05 11:48:11.243906 |
127 |
48660537 |
NEW RIDGEBORE TUBEWELL NEAR ASWINI MONDAL HOUSE AT ANANDANAGAR |
80000 |
NEW RIDGEBORE TUBEWELL NEAR ASWINI MONDAL HOUSE AT ANANDANAGAR1 |
Completion of work |
-
latitude : 23.865120504051447
Longitude : 87.30605632066727
file name : Image_22032022114201192.png
|
2022-03-22 11:42:01.312333 |
128 |
48634268 |
NEW RIDGEBORE TUBEWELL NEAR SK FARID HOUSE AT DEMURTITA |
80000 |
NEW RIDGEBORE TUBEWELL NEAR SK FARID HOUSE AT DEMURTITA1 |
Roof laid |
-
latitude : 23.851903500035405
Longitude : 87.30150385759771
file name : Image_05042022122818532.png
|
2022-04-05 12:28:18.626787 |
129 |
48634268 |
NEW RIDGEBORE TUBEWELL NEAR SK FARID HOUSE AT DEMURTITA |
80000 |
NEW RIDGEBORE TUBEWELL NEAR SK FARID HOUSE AT DEMURTITA1 |
Plinth level |
-
latitude : 23.851946289651096
Longitude : 87.30149690061808
file name : Image_05042022121726722.png
|
2022-04-05 12:17:26.830448 |
130 |
48634268 |
NEW RIDGEBORE TUBEWELL NEAR SK FARID HOUSE AT DEMURTITA |
80000 |
NEW RIDGEBORE TUBEWELL NEAR SK FARID HOUSE AT DEMURTITA1 |
Completion of work |
-
latitude : 23.85184042621404
Longitude : 87.30140478350222
file name : Image_22032022120739464.png
|
2022-03-22 12:07:39.550647 |
131 |
48635578 |
NEW RIDGEBORE TUBEWELL NEAR TARAPADA PATAR FARMHOUSE AT ANANDANAGAR |
80000 |
NEW RIDGEBORE TUBEWELL NEAR TARAPADA PATAR FARMHOUSE AT ANANDANAGAR1 |
Roof laid |
-
latitude : 23.86411509476602
Longitude : 87.30696542188525
file name : Image_05042022120740915.png
|
2022-04-05 12:07:41.002114 |
132 |
48635578 |
NEW RIDGEBORE TUBEWELL NEAR TARAPADA PATAR FARMHOUSE AT ANANDANAGAR |
80000 |
NEW RIDGEBORE TUBEWELL NEAR TARAPADA PATAR FARMHOUSE AT ANANDANAGAR1 |
Plinth level |
-
latitude : 23.864118196070194
Longitude : 87.3069853708148
file name : Image_05042022115144357.png
|
2022-04-05 11:51:44.486763 |
133 |
48635578 |
NEW RIDGEBORE TUBEWELL NEAR TARAPADA PATAR FARMHOUSE AT ANANDANAGAR |
80000 |
NEW RIDGEBORE TUBEWELL NEAR TARAPADA PATAR FARMHOUSE AT ANANDANAGAR1 |
Completion of work |
-
latitude : 23.864129595458508
Longitude : 87.30686928145587
file name : Image_22032022114948684.png
|
2022-03-22 11:49:48.80297 |
134 |
48633596 |
NEW RIDGEBORE TUBEWELL NEAR DUKHEN BAURI HOUSE AT DEMURITITA |
80000 |
NEW RIDGEBORE TUBEWELL NEAR DUKHEN BAURI HOUSE AT DEMURITITA1 |
Roof laid |
-
latitude : 23.85184344369918
Longitude : 87.30157946236432
file name : Image_05042022122716534.png
|
2022-04-05 12:27:16.644501 |
135 |
48633596 |
NEW RIDGEBORE TUBEWELL NEAR DUKHEN BAURI HOUSE AT DEMURITITA |
80000 |
NEW RIDGEBORE TUBEWELL NEAR DUKHEN BAURI HOUSE AT DEMURITITA1 |
Plinth level |
-
latitude : 23.851824877783656
Longitude : 87.30153989978135
file name : Image_05042022122034158.png
|
2022-04-05 12:20:34.298411 |
136 |
48633596 |
NEW RIDGEBORE TUBEWELL NEAR DUKHEN BAURI HOUSE AT DEMURITITA |
80000 |
NEW RIDGEBORE TUBEWELL NEAR DUKHEN BAURI HOUSE AT DEMURITITA1 |
Completion of work |
-
latitude : 23.852103240787983
Longitude : 87.29928768239915
file name : Image_22032022121143405.png
|
2022-03-22 12:11:43.499067 |
137 |
48711870 |
RENOVATION OF DRAIN FROM NASIRUDDIN HOUSE TO SKK BULU HOUSE AT BARABON |
200000 |
RENOVATION OF DRAIN FROM NASIRUDDIN HOUSE TO SKK BULU HOUSE AT BARABON1 |
Plinth level |
-
latitude : 23.84086025878787
Longitude : 87.28841249831021
file name : Image_05042022124300340.png
|
2022-04-05 12:43:00.490349 |
138 |
48711870 |
RENOVATION OF DRAIN FROM NASIRUDDIN HOUSE TO SKK BULU HOUSE AT BARABON |
200000 |
RENOVATION OF DRAIN FROM NASIRUDDIN HOUSE TO SKK BULU HOUSE AT BARABON1 |
Plinth level |
-
latitude : 23.84080280084163
Longitude : 87.28842481970787
file name : Image_21032022150152045.png
|
2022-03-21 15:01:52.136953 |
139 |
48711870 |
RENOVATION OF DRAIN FROM NASIRUDDIN HOUSE TO SKK BULU HOUSE AT BARABON |
200000 |
RENOVATION OF DRAIN FROM NASIRUDDIN HOUSE TO SKK BULU HOUSE AT BARABON1 |
Completion of work |
-
latitude : 23.840815876610577
Longitude : 87.28840663097799
file name : Image_14032022162343263.png
|
2022-03-14 16:23:43.368842 |
140 |
48660755 |
NEW RIDGEBORE TUBEWELL NEAR MANNAN KHAN HOUSE AT BARABON |
80000 |
NEW RIDGEBORE TUBEWELL NEAR MANNAN KHAN HOUSE AT BARABON1 |
Plinth level |
-
latitude : 23.84046903345734
Longitude : 87.28482973761857
file name : Image_05042022125948041.png
|
2022-04-05 12:59:48.153567 |
141 |
48660755 |
NEW RIDGEBORE TUBEWELL NEAR MANNAN KHAN HOUSE AT BARABON |
80000 |
NEW RIDGEBORE TUBEWELL NEAR MANNAN KHAN HOUSE AT BARABON1 |
Roof laid |
-
latitude : 23.840385507792234
Longitude : 87.28484717197716
file name : Image_05042022130132070.png
|
2022-04-05 13:01:32.145612 |
142 |
48660755 |
NEW RIDGEBORE TUBEWELL NEAR MANNAN KHAN HOUSE AT BARABON |
80000 |
NEW RIDGEBORE TUBEWELL NEAR MANNAN KHAN HOUSE AT BARABON1 |
Plinth level |
-
latitude : 23.84044107981026
Longitude : 87.28484205901623
file name : Image_21032022155844620.png
|
2022-03-21 15:58:44.748426 |
143 |
48660755 |
NEW RIDGEBORE TUBEWELL NEAR MANNAN KHAN HOUSE AT BARABON |
80000 |
NEW RIDGEBORE TUBEWELL NEAR MANNAN KHAN HOUSE AT BARABON1 |
Completion of work |
-
latitude : 23.840441959910095
Longitude : 87.28482856415212
file name : Image_21032022155045325.png
|
2022-03-21 15:50:45.440648 |
144 |
48660713 |
NEW RIDGEBORE TUBEWELL NEAR NICHEPARA MASJID AT BARABON |
80000 |
NEW RIDGEBORE TUBEWELL NEAR NICHEPARA MASJID AT BARABON1 |
Roof laid |
-
latitude : 23.839056850410998
Longitude : 87.28521614335477
file name : Image_05042022131702319.png
|
2022-04-05 13:17:02.42282 |
145 |
48660713 |
NEW RIDGEBORE TUBEWELL NEAR NICHEPARA MASJID AT BARABON |
80000 |
NEW RIDGEBORE TUBEWELL NEAR NICHEPARA MASJID AT BARABON1 |
Plinth level |
-
latitude : 23.839074452407658
Longitude : 87.28528336621821
file name : Image_05042022130736555.png
|
2022-04-05 13:07:36.668686 |
146 |
48660713 |
NEW RIDGEBORE TUBEWELL NEAR NICHEPARA MASJID AT BARABON |
80000 |
NEW RIDGEBORE TUBEWELL NEAR NICHEPARA MASJID AT BARABON1 |
Completion of work |
-
latitude : 23.838973115198314
Longitude : 87.28521865792572
file name : Image_22032022123755219.png
|
2022-03-22 12:37:55.317001 |
147 |
48891191 |
RENOVATION OF CC ROAD FROM BHOGOL KHAN HOUSE TO ASER ALI HOUSE AT BARABON |
200000 |
RENOVATION OF CC ROAD FROM BHOGOL KHAN HOUSE TO ASER ALI HOUSE AT BARABON1 |
Plinth level |
-
latitude : 23.83606589399278,23.83611002471298
Longitude : 87.28612440638244,87.28609238751233
file name : Image_05042022133059613.png
|
2022-04-05 13:30:59.707196 |
148 |
48891191 |
RENOVATION OF CC ROAD FROM BHOGOL KHAN HOUSE TO ASER ALI HOUSE AT BARABON |
200000 |
RENOVATION OF CC ROAD FROM BHOGOL KHAN HOUSE TO ASER ALI HOUSE AT BARABON1 |
Completion of work |
-
latitude : 23.836223306134343,23.83619229309261
Longitude : 87.28594017215073,87.28595098480582
file name : Image_05042022132345480.png
|
2022-04-05 13:23:45.572138 |
149 |
48660862 |
NEW RIDGEBORE TUBEWELL NEAR SK SADAI HOUSE AT BARABON |
80000 |
NEW RIDGEBORE TUBEWELL NEAR SK SADAI HOUSE AT BARABON1 |
Roof laid |
-
latitude : 23.83595148101449
Longitude : 87.28624250739813
file name : Image_05042022133320919.png
|
2022-04-05 13:33:21.013048 |
150 |
48660862 |
NEW RIDGEBORE TUBEWELL NEAR SK SADAI HOUSE AT BARABON |
80000 |
NEW RIDGEBORE TUBEWELL NEAR SK SADAI HOUSE AT BARABON1 |
Plinth level |
-
latitude : 23.835945990867913
Longitude : 87.28624368086457
file name : Image_05042022132848433.png
|
2022-04-05 13:28:48.536257 |
151 |
48660862 |
NEW RIDGEBORE TUBEWELL NEAR SK SADAI HOUSE AT BARABON |
80000 |
NEW RIDGEBORE TUBEWELL NEAR SK SADAI HOUSE AT BARABON1 |
Plinth level |
-
latitude : 23.836035593412817
Longitude : 87.28627000004053
file name : Image_21032022154548821.png
|
2022-03-21 15:45:48.925708 |
152 |
48660862 |
NEW RIDGEBORE TUBEWELL NEAR SK SADAI HOUSE AT BARABON |
80000 |
NEW RIDGEBORE TUBEWELL NEAR SK SADAI HOUSE AT BARABON1 |
Completion of work |
-
latitude : 23.835980691947043
Longitude : 87.28626186959445
file name : Image_21032022153907059.png
|
2022-03-21 15:39:07.170343 |
153 |
48891046 |
RENOVATION OF CONCRETE ROAD FROM BORO ASTANA TO REJAUL KKHAN HOUSE AT BARABON |
150000 |
RENOVATION OF CONCRETE ROAD FROM BORO ASTANA TO REJAUL KKHAN HOUSE AT BARABON1 |
Plinth level |
-
latitude : 23.83733189664781,23.8376169
Longitude : 87.28642590343952,87.2851867
file name : Image_29042022154425392.png
|
2022-04-29 15:44:25.522455 |
154 |
48891046 |
RENOVATION OF CONCRETE ROAD FROM BORO ASTANA TO REJAUL KKHAN HOUSE AT BARABON |
150000 |
RENOVATION OF CONCRETE ROAD FROM BORO ASTANA TO REJAUL KKHAN HOUSE AT BARABON1 |
Completion of work |
-
latitude : 23.837338518351316,23.8376181
Longitude : 87.28644300252199,87.2851878
file name : Image_29042022153646551.png
|
2022-04-29 15:36:46.674915 |
155 |
48892345 |
VECTOR BORNE DISEASE CONTROL MEASURE IN ALL SANSAD OF GP |
70000 |
VECTOR BORNE DISEASE CONTROL MEASURE IN ALL SANSAD OF GP1 |
Plinth level |
-
latitude : 23.8222503
Longitude : 87.2931974
file name : Image_08022022145816682.png
|
2022-02-08 14:58:16.807159 |
156 |
48711214 |
MAINTENANCE CHARGES FOR ALL EXISTING TUBEWELL WITHIN GP AREA |
71700 |
MAINTENANCE CHARGES FOR ALL EXISTING TUBEWELL WITHIN GP AREA1 |
Completion of work |
-
latitude : 23.8221899
Longitude : 87.2933945
file name : Image_04072022142243680.png
|
2022-07-04 14:22:43.761513 |
157 |
48712325 |
CONSCIOUSNESS PROGRAMME FOR HEALTH AND SANITATION WITHIN GP AREA |
100000 |
CONSCIOUSNESS PROGRAMME FOR HEALTH AND SANITATION WITHIN GP AREA1 |
Plinth level |
-
latitude : 23.8223825
Longitude : 87.2931505
file name : Image_29082022132106944.png
|
2022-08-29 13:21:07.028031 |
158 |
48712325 |
CONSCIOUSNESS PROGRAMME FOR HEALTH AND SANITATION WITHIN GP AREA |
100000 |
CONSCIOUSNESS PROGRAMME FOR HEALTH AND SANITATION WITHIN GP AREA1 |
Completion of work |
-
latitude : 23.8223853
Longitude : 87.2932122
file name : Image_25082022204521029.png
|
2022-08-25 20:45:21.104189 |
159 |
48660996 |
NEW RIDGEBORE TUBEWELL NEAR SK SABIR HOUSE AT BARABON |
80000 |
NEW RIDGEBORE TUBEWELL NEAR SK SABIR HOUSE AT BARABON1 |
Completion of work |
-
latitude : 23.8369243
Longitude : 87.28878827
file name : Image_07122022122931145.png
|
2022-12-07 12:29:31.246191 |
160 |
48661139 |
NEW RIDGEBORE TUBEWELL NEAR DAMODAR SARKAR HOUSE AT RUPUSPUR |
80000 |
NEW RIDGEBORE TUBEWELL NEAR DAMODAR SARKAR HOUSE AT RUPUSPUR1 |
Completion of work |
-
latitude : 23.82130638
Longitude : 87.29313592
file name : Image_03092022120746450.png
|
2022-09-03 12:07:46.554034 |
161 |
48712242 |
VAT CONSTRUCTION IN ALL SANSAD OF GP |
300000 |
VAT CONSTRUCTION IN ALL SANSAD OF GP1 |
Completion of work |
-
latitude : 23.8221925
Longitude : 87.2933704
file name : Image_03092022115623612.png
|
2022-09-03 11:56:23.757132 |
162 |
48711534 |
RENOVATION OF DRAIN FROM DASARATH DAS HOUSE TO JHARU DOME HOUSE AT BARGHATA |
100000 |
RENOVATION OF DRAIN FROM DASARATH DAS HOUSE TO JHARU DOME HOUSE AT BARGHATA1 |
Completion of work |
-
latitude : 23.81799625
Longitude : 87.30812616
file name : Image_10112022092625515.png
|
2022-11-10 09:26:25.610852 |
163 |
48752705 |
RENOVATION OF CONCRETE ROAD FROM MASJID TO PYAR MONDAL HOUSE AT DEMURTITA |
200000 |
RENOVATION OF CONCRETE ROAD FROM MASJID TO PYAR MONDAL HOUSE AT DEMURTITA1 |
Completion of work |
-
latitude : 23.8507992,23.8507953
Longitude : 87.30024281,87.30025104
file name : Image_07122022122925152.png
|
2022-12-07 12:29:25.250789 |
164 |
48903140 |
RENOVATION OF BATHING GHAT WITH CHANGE ROOM AT DHARAMGORE AT CHHORA |
80000 |
RENOVATION OF BATHING GHAT WITH CHANGE ROOM AT DHARAMGORE AT CHHORA1 |
Completion of work |
-
latitude : 23.8197747
Longitude : 87.307272
file name : Image_10112022094400941.png
|
2022-11-10 09:44:01.032895 |
165 |
48711579 |
RENOVATION OF DRAIN FROM BARDHAN PUKUR TO HARADHAN GARAIN FIELD AT KARIDHYA |
408300 |
RENOVATION OF DRAIN FROM BARDHAN PUKUR TO HARADHAN GARAIN FIELD AT KARIDHYA1 |
Completion of work |
-
latitude : 23.84461522
Longitude : 87.29485309
file name : Image_23122022131835686.png
|
2022-12-23 13:18:35.793316 |
166 |
48711579 |
RENOVATION OF DRAIN FROM BARDHAN PUKUR TO HARADHAN GARAIN FIELD AT KARIDHYA |
408300 |
RENOVATION OF DRAIN FROM BARDHAN PUKUR TO HARADHAN GARAIN FIELD AT KARIDHYA1 |
Completion of work |
-
latitude : 23.84461944
Longitude : 87.29485631
file name : Image_23122022132036491.png
|
2022-12-23 13:20:36.584039 |
167 |
48903222 |
RENOVATION OF BATHING GHAT WITH CHANGE ROOM AT MOROL PUKUR AT JAHIDPUR |
80000 |
RENOVATION OF BATHING GHAT WITH CHANGE ROOM AT MOROL PUKUR AT JAHIDPUR1 |
Completion of work |
-
latitude : 23.84158903
Longitude : 87.25905981
file name : Image_07122022122937079.png
|
2022-12-07 12:29:37.175481 |
168 |
48903256 |
RENOVATION OF BATHING GHAT WITH CHANGE ROOM AT BAGAN PUKUR AT JAHIDPUR |
80000 |
RENOVATION OF BATHING GHAT WITH CHANGE ROOM AT BAGAN PUKUR AT JAHIDPUR1 |
Completion of work |
-
latitude : 23.84365151
Longitude : 87.25677938
file name : Image_07122022122934173.png
|
2022-12-07 12:29:34.280909 |
169 |
48711950 |
RENOVATION OF DRAIN FROM ICDS TO BAURI PARA AT BARABON |
200000 |
RENOVATION OF DRAIN FROM ICDS TO BAURI PARA AT BARABON1 |
Completion of work |
-
latitude : 23.8356277
Longitude : 87.28773878
file name : Image_31032023133642689.png
|
2023-03-31 13:36:42.807501 |
170 |
48711950 |
RENOVATION OF DRAIN FROM ICDS TO BAURI PARA AT BARABON |
200000 |
RENOVATION OF DRAIN FROM ICDS TO BAURI PARA AT BARABON1 |
Completion of work |
-
latitude : 23.8356277
Longitude : 87.28773878
file name : Image_31032023133647369.png
|
2023-03-31 13:36:47.469237 |
171 |
48667838 |
TUBEWELL PARTS PURCHASE FOR WATER FOR PEOPLE NGO |
100000 |
TUBEWELL PARTS PURCHASE FOR WATER FOR PEOPLE NGO1 |
Completion of work |
-
latitude : 23.82239
Longitude : 87.29319519
file name : Image_03012023135053217.png
|
2023-01-03 13:50:53.326978 |
172 |
48891793 |
RENOVATION OF DRAIN FROM BANDH PUKUR TO NEJAMUL MATH AT BARABON |
230000 |
RENOVATION OF DRAIN FROM BANDH PUKUR TO NEJAMUL MATH AT BARABON1 |
Completion of work |
-
latitude : 23.8381447
Longitude : 87.285407
file name : Image_23122022131824431.png
|
2022-12-23 13:18:24.52327 |
173 |
48891793 |
RENOVATION OF DRAIN FROM BANDH PUKUR TO NEJAMUL MATH AT BARABON |
230000 |
RENOVATION OF DRAIN FROM BANDH PUKUR TO NEJAMUL MATH AT BARABON1 |
Completion of work |
-
latitude : 23.84090237
Longitude : 87.28885229
file name : Image_23122022131829208.png
|
2022-12-23 13:18:29.314764 |
174 |
57607762 |
CONSTRUCTION OF CC ROAD FROM GARUL HOUSE TO BARO MASJID AT BARABON |
270000 |
CONSTRUCTION OF CC ROAD FROM GARUL HOUSE TO BARO MASJID AT BARABON1 |
Completion of work |
-
latitude : 23.837491,23.837491,23.837491,23.837491
Longitude : 87.2850499,87.2850499,87.2850499,87.2850499
file name : Image_17102023132012476.png
|
2023-10-17 13:20:12.627671 |
175 |
57607762 |
CONSTRUCTION OF CC ROAD FROM GARUL HOUSE TO BARO MASJID AT BARABON |
270000 |
CONSTRUCTION OF CC ROAD FROM GARUL HOUSE TO BARO MASJID AT BARABON1 |
Completion of work |
-
latitude : 23.8375193,23.8375193,23.8375193
Longitude : 87.2850481,87.2850481,87.2850481
file name : Image_17102023131911177.png
|
2023-10-17 13:19:11.313693 |
176 |
57607762 |
CONSTRUCTION OF CC ROAD FROM GARUL HOUSE TO BARO MASJID AT BARABON |
270000 |
CONSTRUCTION OF CC ROAD FROM GARUL HOUSE TO BARO MASJID AT BARABON1 |
Completion of work |
-
latitude : 23.8374981,23.83650584
Longitude : 87.2850495,87.27600203
file name : Image_17102023131837353.png
|
2023-10-17 13:18:37.484051 |
177 |
48891258 |
RENOVATION OF CONCRRETE ROAD FROM MANASA MANDIR TO FOOTBALL GROUND AT JAHIDPUR |
200000 |
RENOVATION OF CONCRRETE ROAD FROM MANASA MANDIR TO FOOTBALL GROUND AT JAHIDPUR1 |
Roof laid |
-
latitude : 23.83842756,23.83844291
Longitude : 87.25661686,87.25661767
file name : Image_21022023151018375.png
|
2023-02-21 15:10:18.475309 |
178 |
48891258 |
RENOVATION OF CONCRRETE ROAD FROM MANASA MANDIR TO FOOTBALL GROUND AT JAHIDPUR |
200000 |
RENOVATION OF CONCRRETE ROAD FROM MANASA MANDIR TO FOOTBALL GROUND AT JAHIDPUR1 |
Plinth level |
-
latitude : 23.83845852,23.83847697
Longitude : 87.25661945,87.25661716
file name : Image_21022023150455191.png
|
2023-02-21 15:04:55.273176 |
179 |
48890690 |
RENOVATION OF CC ROAD FROM BABU MUKHERJEE SHOP TO DASPARA MANASA MANDIR AT RUPUSPUR |
100000 |
RENOVATION OF CC ROAD FROM BABU MUKHERJEE SHOP TO DASPARA MANASA MANDIR AT RUPUSPUR1 |
Roof laid |
-
latitude : 23.82163178,23.82162983
Longitude : 87.29475337,87.29475582
file name : Image_21022023155956882.png
|
2023-02-21 15:59:56.986468 |
180 |
48890690 |
RENOVATION OF CC ROAD FROM BABU MUKHERJEE SHOP TO DASPARA MANASA MANDIR AT RUPUSPUR |
100000 |
RENOVATION OF CC ROAD FROM BABU MUKHERJEE SHOP TO DASPARA MANASA MANDIR AT RUPUSPUR1 |
Plinth level |
-
latitude : 23.82163799,23.82162948
Longitude : 87.29476161,87.29475162
file name : Image_21022023155621905.png
|
2023-02-21 15:56:22.004315 |
181 |
48890690 |
RENOVATION OF CC ROAD FROM BABU MUKHERJEE SHOP TO DASPARA MANASA MANDIR AT RUPUSPUR |
100000 |
RENOVATION OF CC ROAD FROM BABU MUKHERJEE SHOP TO DASPARA MANASA MANDIR AT RUPUSPUR1 |
Completion of work |
-
latitude : 23.8210883,23.8210883
Longitude : 87.2946833,87.2946833
file name : Image_21022023155404784.png
|
2023-02-21 15:54:04.89029 |
182 |
48890690 |
RENOVATION OF CC ROAD FROM BABU MUKHERJEE SHOP TO DASPARA MANASA MANDIR AT RUPUSPUR |
100000 |
RENOVATION OF CC ROAD FROM BABU MUKHERJEE SHOP TO DASPARA MANASA MANDIR AT RUPUSPUR1 |
Completion of work |
-
latitude : 23.82161737,23.8210878
Longitude : 87.29479088,87.2946828
file name : Image_21022023154857852.png
|
2023-02-21 15:48:57.957761 |
183 |
57606667 |
CONSTRUCTION OF CC ROAD FROM BADIR HOUSE TO RASID HOUSE AT BARABON |
270000 |
CONSTRUCTION OF CC ROAD FROM BADIR HOUSE TO RASID HOUSE AT BARABON1 |
Completion of work |
-
latitude : 23.84109811,23.84110322,23.84110322,23.84110322
Longitude : 87.28569527,87.2856981,87.2856981,87.2856981
file name : Image_17102023133352936.png
|
2023-10-17 13:33:54.070188 |
184 |
57606667 |
CONSTRUCTION OF CC ROAD FROM BADIR HOUSE TO RASID HOUSE AT BARABON |
270000 |
CONSTRUCTION OF CC ROAD FROM BADIR HOUSE TO RASID HOUSE AT BARABON1 |
Completion of work |
-
latitude : 23.84112593,23.84112593,23.84112621
Longitude : 87.28565455,87.28565455,87.28565388
file name : Image_17102023133258447.png
|
2023-10-17 13:32:59.311398 |
185 |
57606667 |
CONSTRUCTION OF CC ROAD FROM BADIR HOUSE TO RASID HOUSE AT BARABON |
270000 |
CONSTRUCTION OF CC ROAD FROM BADIR HOUSE TO RASID HOUSE AT BARABON1 |
Completion of work |
-
latitude : 23.84112478,23.8411213
Longitude : 87.28563248,87.28563553
file name : Image_17102023132704003.png
|
2023-10-17 13:27:04.09639 |
186 |
48903092 |
RENOVATION OF BATHING GHAT WITH CHANGE ROOM AT DURGABHASA PUKUR AT PARATIA |
80000 |
RENOVATION OF BATHING GHAT WITH CHANGE ROOM AT DURGABHASA PUKUR AT PARATIA1 |
Completion of work |
-
latitude : 23.83774878
Longitude : 87.29442089
file name : Image_15032023160436580.png
|
2023-03-15 16:04:36.70848 |
187 |
56724360 |
CONSTRUCTION OF COVER DRAIN FROM BHUDHAR MAL HOUSE TO CHARAN PUKUR AT NINGA |
140000 |
CONSTRUCTION OF COVER DRAIN FROM BHUDHAR MAL HOUSE TO CHARAN PUKUR AT NINGA1 |
Completion of work |
-
latitude : 23.82884456,23.82884458
Longitude : 87.29682257,87.29682257
file name : Image_20042023165813236.png
|
2023-04-20 16:58:13.331215 |
188 |
56724156 |
CONSTRUCTION OF COVER DRAIN FROM ATUL GHOSH HOUSE TO JUGIR PUKUR AT NICHINTA |
200000 |
CONSTRUCTION OF COVER DRAIN FROM ATUL GHOSH HOUSE TO JUGIR PUKUR AT NICHINTA1 |
Completion of work |
-
latitude : 23.82643488,23.82643488
Longitude : 87.30591293,87.30591293
file name : Image_30032023133846665.png
|
2023-03-30 13:38:46.810939 |
189 |
56726284 |
CONSTRUCTION OF COVER DRAIN FROM GOUR TALA SUBMERCIBLE TO GHAT GORE AT CHHORA |
100000 |
CONSTRUCTION OF COVER DRAIN FROM GOUR TALA SUBMERCIBLE TO GHAT GORE AT CHHORA1 |
Completion of work |
-
latitude : 23.8227526,23.8227526
Longitude : 87.30889968,87.30889968
file name : Image_30032023131428725.png
|
2023-03-30 13:14:28.825687 |
190 |
57606303 |
CONSTRUCTION OF CC ROAD FROM SK DILU HOUSE TO SK SAKBUL HOUSE AT BARABON |
270000 |
CONSTRUCTION OF CC ROAD FROM SK DILU HOUSE TO SK SAKBUL HOUSE AT BARABON1 |
Completion of work |
-
latitude : 23.83653687,23.83653686
Longitude : 87.28889119,87.2888912
file name : Image_19042023114255366.png
|
2023-04-19 11:42:55.464445 |
191 |
56738325 |
CONSTRUCTION OF COVER DRAIN FROM HABAL DAS HOUSE TO MITHUN DAS HOUSE AT BARGHATA |
156040 |
CONSTRUCTION OF COVER DRAIN FROM HABAL DAS HOUSE TO MITHUN DAS HOUSE AT BARGHATA1 |
Completion of work |
-
latitude : 23.8168118,23.81681183
Longitude : 87.30818918,87.30818917
file name : Image_30032023133025463.png
|
2023-03-30 13:30:25.565355 |
192 |
56724668 |
CONSTRUCTION OF COVER DRAIN FROM FULBAGAN TUBEWELL TO SK KALO HOUSE AT BARABON |
270000 |
CONSTRUCTION OF COVER DRAIN FROM FULBAGAN TUBEWELL TO SK KALO HOUSE AT BARABON1 |
Completion of work |
-
latitude : 23.8374702,23.8374702
Longitude : 87.2850354,87.2850354
file name : Image_30032023163301901.png
|
2023-03-30 16:33:02.013247 |
193 |
56725048 |
CONSTRUCTION OF COVER DRAIN FROM DHIREN DAS HOUSE TO BIDYUT DAS HOUSE AT HATIKATA |
150000 |
CONSTRUCTION OF COVER DRAIN FROM DHIREN DAS HOUSE TO BIDYUT DAS HOUSE AT HATIKATA1 |
Completion of work |
-
latitude : 23.83848138,23.83848111
Longitude : 87.24896863,87.24896886
file name : Image_19042023101435941.png
|
2023-04-19 10:14:36.049119 |
194 |
56793127 |
WAGES FOR REPAIRING OF TUBEWELLS |
100000 |
WAGES FOR REPAIRING OF TUBEWELLS1 |
Plinth level |
-
latitude : 23.82278159
Longitude : 87.29312677
file name : Image_20042023123953969.png
|
2023-04-20 12:39:54.089086 |
195 |
56750615 |
SETTING UP OF NEW TUBEWELL MARK II WITH SOAKPIT NEAR KARIDHYA SASHAN |
85000 |
SETTING UP OF NEW TUBEWELL MARK II WITH SOAKPIT NEAR KARIDHYA SASHAN1 |
Plinth level |
-
latitude : 23.84634779
Longitude : 87.29794062
file name : Image_28042023135610555.png
|
2023-04-28 13:56:10.659898 |
196 |
56750615 |
SETTING UP OF NEW TUBEWELL MARK II WITH SOAKPIT NEAR KARIDHYA SASHAN |
85000 |
SETTING UP OF NEW TUBEWELL MARK II WITH SOAKPIT NEAR KARIDHYA SASHAN1 |
Completion of work |
-
latitude : 23.84638797
Longitude : 87.29793529
file name : Image_28042023135315307.png
|
2023-04-28 13:53:15.418359 |
197 |
56792698 |
SETTING UP OF SUBMERSIBLE WITH WATER TANK NEAR CHUAGARH DURGA MANDIR |
250000 |
SETTING UP OF SUBMERSIBLE WITH WATER TANK NEAR CHUAGARH DURGA MANDIR1 |
Roof laid |
-
latitude : 23.82071553
Longitude : 87.28977302
file name : Image_04082023102235822.png
|
2023-08-04 10:22:35.99802 |
198 |
56792698 |
SETTING UP OF SUBMERSIBLE WITH WATER TANK NEAR CHUAGARH DURGA MANDIR |
250000 |
SETTING UP OF SUBMERSIBLE WITH WATER TANK NEAR CHUAGARH DURGA MANDIR1 |
Plinth level |
-
latitude : 23.82067208
Longitude : 87.28984062
file name : Image_19042023101242935.png
|
2023-04-19 10:12:43.043417 |
199 |
56792698 |
SETTING UP OF SUBMERSIBLE WITH WATER TANK NEAR CHUAGARH DURGA MANDIR |
250000 |
SETTING UP OF SUBMERSIBLE WITH WATER TANK NEAR CHUAGARH DURGA MANDIR1 |
Completion of work |
-
latitude : 23.82067652
Longitude : 87.2897649
file name : Image_31032023141923389.png
|
2023-03-31 14:19:23.487928 |
200 |
57601188 |
CONSTRUCTION OF CC ROAD FROM TALGORE TO MANIK BAURI HOUSE AT ANANDANAGAR |
270000 |
CONSTRUCTION OF CC ROAD FROM TALGORE TO MANIK BAURI HOUSE AT ANANDANAGAR1 |
Roof laid |
-
latitude : 23.86479153,23.86470908
Longitude : 87.30577452,87.30574029
file name : Image_30052023160146167.png
|
2023-05-30 16:01:46.270013 |
201 |
57601188 |
CONSTRUCTION OF CC ROAD FROM TALGORE TO MANIK BAURI HOUSE AT ANANDANAGAR |
270000 |
CONSTRUCTION OF CC ROAD FROM TALGORE TO MANIK BAURI HOUSE AT ANANDANAGAR1 |
Plinth level |
-
latitude : 23.8647639,23.8647639
Longitude : 87.30574701,87.30574701
file name : Image_30052023155530304.png
|
2023-05-30 15:55:30.400277 |
202 |
57601188 |
CONSTRUCTION OF CC ROAD FROM TALGORE TO MANIK BAURI HOUSE AT ANANDANAGAR |
270000 |
CONSTRUCTION OF CC ROAD FROM TALGORE TO MANIK BAURI HOUSE AT ANANDANAGAR1 |
Completion of work |
-
latitude : 23.86468537,23.86465621
Longitude : 87.30577556,87.30579927
file name : Image_27052023175002972.png
|
2023-05-27 17:50:03.047056 |
203 |
57601899 |
CONSTRUCTION OF CC ROAD FROM PATAL BAURI HOUSE TO NILUGORE AT DEMURIA |
120000 |
CONSTRUCTION OF CC ROAD FROM PATAL BAURI HOUSE TO NILUGORE AT DEMURIA1 |
Completion of work |
-
latitude : 23.84237533,23.84237533
Longitude : 87.30876589,87.30876589
file name : Image_30052023163748282.png
|
2023-05-30 16:37:48.379163 |
204 |
57604359 |
CONSTRUCTION OF CC ROAD FROM SANTOSH GARAIN HOUSE TO CHANDITALA AT KARIDHYA |
150000 |
CONSTRUCTION OF CC ROAD FROM SANTOSH GARAIN HOUSE TO CHANDITALA AT KARIDHYA1 |
Roof laid |
-
latitude : 23.84517881,23.84517881
Longitude : 87.29402458,87.29402458
file name : Image_05062023122912200.png
|
2023-06-05 12:29:12.321895 |
205 |
57604359 |
CONSTRUCTION OF CC ROAD FROM SANTOSH GARAIN HOUSE TO CHANDITALA AT KARIDHYA |
150000 |
CONSTRUCTION OF CC ROAD FROM SANTOSH GARAIN HOUSE TO CHANDITALA AT KARIDHYA1 |
Plinth level |
-
latitude : 23.84516726,23.84516726
Longitude : 87.29401863,87.29401863
file name : Image_30052023165205105.png
|
2023-05-30 16:52:05.210516 |
206 |
57604359 |
CONSTRUCTION OF CC ROAD FROM SANTOSH GARAIN HOUSE TO CHANDITALA AT KARIDHYA |
150000 |
CONSTRUCTION OF CC ROAD FROM SANTOSH GARAIN HOUSE TO CHANDITALA AT KARIDHYA1 |
Completion of work |
-
latitude : 23.84518022,23.84518022
Longitude : 87.2940183,87.2940183
file name : Image_30052023164357094.png
|
2023-05-30 16:43:57.205259 |
207 |
57604359 |
CONSTRUCTION OF CC ROAD FROM SANTOSH GARAIN HOUSE TO CHANDITALA AT KARIDHYA |
150000 |
CONSTRUCTION OF CC ROAD FROM SANTOSH GARAIN HOUSE TO CHANDITALA AT KARIDHYA1 |
Completion of work |
-
latitude : 23.84504835,23.84504835
Longitude : 87.29414256,87.29414256
file name : Image_30052023164238292.png
|
2023-05-30 16:42:38.392875 |
208 |
57613012 |
MAINTENANCE OF TUBEWELL PARTS |
350000 |
MAINTENANCE OF TUBEWELL PARTS |
Completion of work |
-
latitude : 23.8223186
Longitude : 87.2931961
file name : Image_05062023123314387.png
|
2023-06-05 12:33:14.477071 |
209 |
56725380 |
CONSTRUCTION OF COVER DRAIN FROM BISHU HAZRA HOUSE TO CLUB HOUSE AT CHUAGARH |
140000 |
CONSTRUCTION OF COVER DRAIN FROM BISHU HAZRA HOUSE TO CLUB HOUSE AT CHUAGARH1 |
Completion of work |
-
latitude : 23.82114037,23.82112827
Longitude : 87.29018241,87.29017871
file name : Image_04082023101807499.png
|
2023-08-04 10:18:07.592169 |
210 |
56725380 |
CONSTRUCTION OF COVER DRAIN FROM BISHU HAZRA HOUSE TO CLUB HOUSE AT CHUAGARH |
140000 |
CONSTRUCTION OF COVER DRAIN FROM BISHU HAZRA HOUSE TO CLUB HOUSE AT CHUAGARH1 |
Completion of work |
-
latitude : 23.82112762,23.82112763,23.82112764
Longitude : 87.29018146,87.29018144,87.29018145
file name : Image_04082023101842761.png
|
2023-08-04 10:18:42.85373 |
211 |
57610175 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TO KANAI BAGDI HOUSE AT CHARIGRAM |
130000 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TO KANAI BAGDI HOUSE AT CHARIGRAM1 |
Completion of work |
-
latitude : 23.82231377,23.82080372
Longitude : 87.2932818,87.30856972
file name : Image_20072023173134992.png
|
2023-07-20 17:31:35.079748 |
212 |
57610175 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TO KANAI BAGDI HOUSE AT CHARIGRAM |
130000 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TO KANAI BAGDI HOUSE AT CHARIGRAM1 |
Completion of work |
-
latitude : 23.82080829,23.82080821,23.82080821
Longitude : 87.30858062,87.30858063,87.30858063
file name : Image_20072023173219788.png
|
2023-07-20 17:32:19.871576 |
213 |
57610499 |
CONSTRCTION OF CC ROAD FROM BAURIPARA TOWARDS TOWER AT BARGHATA |
200000 |
CONSTRCTION OF CC ROAD FROM BAURIPARA TOWARDS TOWER AT BARGHATA1 |
Completion of work |
-
latitude : 23.81612611,23.81612611,23.81612611
Longitude : 87.3105054,87.3105054,87.3105054
file name : Image_21072023112809517.png
|
2023-07-21 11:28:09.643323 |
214 |
57610499 |
CONSTRCTION OF CC ROAD FROM BAURIPARA TOWARDS TOWER AT BARGHATA |
200000 |
CONSTRCTION OF CC ROAD FROM BAURIPARA TOWARDS TOWER AT BARGHATA1 |
Completion of work |
-
latitude : 23.81660764,23.8161445
Longitude : 87.30899579,87.31050978
file name : Image_21072023112715575.png
|
2023-07-21 11:27:15.684685 |
215 |
56724779 |
CONSTRUCTION OF COVER DRAIN FROM SEKH PARA TO PIYAJ KANALI AT BARABON |
270000 |
CONSTRUCTION OF COVER DRAIN FROM SEKH PARA TO PIYAJ KANALI AT BARABON1 |
Completion of work |
-
latitude : 23.83982604,23.83980746
Longitude : 87.28578965,87.28581375
file name : Image_20072023165623085.png
|
2023-07-20 16:56:23.176201 |
216 |
56724779 |
CONSTRUCTION OF COVER DRAIN FROM SEKH PARA TO PIYAJ KANALI AT BARABON |
270000 |
CONSTRUCTION OF COVER DRAIN FROM SEKH PARA TO PIYAJ KANALI AT BARABON1 |
Completion of work |
-
latitude : 23.83981278,23.83983749
Longitude : 87.28580848,87.28578721
file name : Image_20072023165626616.png
|
2023-07-20 16:56:26.704217 |
217 |
56724855 |
CONSTRUCTION OF COVER DRAIN FROM DADI PUKUR TO KANDAR AT BARABON |
270000 |
CONSTRUCTION OF COVER DRAIN FROM DADI PUKUR TO KANDAR AT BARABON1 |
Completion of work |
-
latitude : 23.83684989,23.83684989,23.83684991
Longitude : 87.2761673,87.2761673,87.27616732
file name : Image_02112023162700470.png
|
2023-11-02 16:27:00.578102 |
218 |
56724855 |
CONSTRUCTION OF COVER DRAIN FROM DADI PUKUR TO KANDAR AT BARABON |
270000 |
CONSTRUCTION OF COVER DRAIN FROM DADI PUKUR TO KANDAR AT BARABON1 |
Completion of work |
-
latitude : 23.8368516,23.83684857
Longitude : 87.27617374,87.27616785
file name : Image_02112023162620468.png
|
2023-11-02 16:26:20.564295 |
219 |
68641232 |
Creation of a new source of drinking water |
85000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.81672535
Longitude : 87.30275145
file name : Image_04012024131447004.png
|
2024-01-04 13:14:47.091195 |
220 |
68641232 |
Creation of a new source of drinking water |
85000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.81671544
Longitude : 87.3027544
file name : Image_04012024130738870.png
|
2024-01-04 13:07:38.956741 |
221 |
68641232 |
Creation of a new source of drinking water |
85000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.81671932
Longitude : 87.30276387
file name : Image_04012024130415448.png
|
2024-01-04 13:04:15.534053 |
222 |
68637994 |
Creation of drainage channel for management of grey water |
250000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.81657564
Longitude : 87.3099108
file name : Image_04012024134155152.png
|
2024-01-04 13:41:54.572542 |
223 |
68637994 |
Creation of drainage channel for management of grey water |
250000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.81665855
Longitude : 87.30993843
file name : Image_04012024133300986.png
|
2024-01-04 13:32:59.315629 |
224 |
68637994 |
Creation of drainage channel for management of grey water |
250000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.81666154
Longitude : 87.30995006
file name : Image_04012024133010975.png
|
2024-01-04 13:30:11.055131 |
225 |
68642057 |
Creation of a new source of drinking water |
85000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.82941642
Longitude : 87.31052314
file name : Image_04012024140957914.png
|
2024-01-04 14:09:57.615097 |
226 |
68642057 |
Creation of a new source of drinking water |
85000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.82942303
Longitude : 87.31052312
file name : Image_04012024140740774.png
|
2024-01-04 14:07:40.869637 |
227 |
68642057 |
Creation of a new source of drinking water |
85000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.82943055
Longitude : 87.31054254
file name : Image_04012024140501478.png
|
2024-01-04 14:05:01.621766 |
228 |
68616697 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.85109694,23.85109695,23.85109695
Longitude : 87.29491111,87.29491109,87.29491109
file name : Image_07022024165246783.png
|
2024-02-07 16:52:46.882101 |
229 |
68616697 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.85110721,23.85111288
Longitude : 87.29492381,87.29491585
file name : Image_07022024164833248.png
|
2024-02-07 16:48:33.351142 |
230 |
68616697 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.85110961,23.85110961
Longitude : 87.29495402,87.29495401
file name : Image_07022024164555659.png
|
2024-02-07 16:45:55.760666 |
231 |
68616697 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.85111534,23.85111441,23.8511142
Longitude : 87.29493251,87.29493495,87.29493517
file name : Image_07022024162049013.png
|
2024-02-07 16:20:49.11131 |
232 |
68617079 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.8427515,23.84274902
Longitude : 87.30913337,87.30913904
file name : Image_12022024152012890.png
|
2024-02-12 15:20:13.071168 |
233 |
68617079 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.842792,23.842792
Longitude : 87.30902567,87.30902567
file name : Image_12022024151913793.png
|
2024-02-12 15:19:13.896886 |
234 |
68617079 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.84280523,23.84280515
Longitude : 87.30902924,87.30902922
file name : Image_12022024151714047.png
|
2024-02-12 15:17:14.155289 |
235 |
68617079 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.84278551,23.84278812
Longitude : 87.3090707,87.30905241
file name : Image_12022024151139271.png
|
2024-02-12 15:11:39.372986 |
236 |
68637091 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.82466245
Longitude : 87.28014543
file name : Image_07022024154549023.png
|
2024-02-07 15:45:49.127099 |
237 |
68637091 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.82469865
Longitude : 87.28017102
file name : Image_07022024153946524.png
|
2024-02-07 15:39:46.628789 |
238 |
68637091 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.8223174
Longitude : 87.2931959
file name : Image_07022024152958070.png
|
2024-02-07 15:29:58.185941 |
239 |
68637091 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.8223174
Longitude : 87.2931959
file name : Image_07022024152715040.png
|
2024-02-07 15:27:15.16387 |
240 |
68625880 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drain34age channel for management of grey water1 |
Roof laid |
-
latitude : 23.85041859
Longitude : 87.30286978
file name : Image_30112023150151003.png
|
2023-11-30 15:01:51.146526 |
241 |
68625880 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drain34age channel for management of grey water1 |
Plinth level |
-
latitude : 23.85023634
Longitude : 87.30276536
file name : Image_30112023144014310.png
|
2023-11-30 14:40:14.404874 |
242 |
68625880 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drain34age channel for management of grey water1 |
Completion of work |
-
latitude : 23.85024285
Longitude : 87.30277572
file name : Image_30112023143125439.png
|
2023-11-30 14:31:25.555572 |
243 |
68625880 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drain34age channel for management of grey water1 |
Completion of work |
-
latitude : 23.84454733
Longitude : 87.2935622
file name : Image_30112023143119109.png
|
2023-11-30 14:31:19.211773 |
244 |
68618690 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.83673524,23.83673479
Longitude : 87.2892386,87.28923928
file name : Image_30112023151617966.png
|
2023-11-30 15:16:18.118805 |
245 |
68618690 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.83670018,23.83670018
Longitude : 87.28927318,87.28927318
file name : Image_30112023150647401.png
|
2023-11-30 15:06:47.519061 |
246 |
68618690 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.83672524,23.83672227
Longitude : 87.28925588,87.28926202
file name : Image_30112023150307057.png
|
2023-11-30 15:03:07.170061 |
247 |
68619244 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.83914204,23.83914204
Longitude : 87.2848182,87.2848182
file name : Image_27122023142859442.png
|
2023-12-27 14:28:59.546171 |
248 |
68619244 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.8391336,23.8391336
Longitude : 87.28480114,87.28480114
file name : Image_27122023141849358.png
|
2023-12-27 14:18:49.448601 |
249 |
68619244 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.83921472,23.83921472
Longitude : 87.28457397,87.28457397
file name : Image_07122023124831365.png
|
2023-12-07 12:48:31.455383 |
250 |
56724020 |
CONSTRUCTION OF COVER DRAIN FROM BANDH NALA TO AMAR MONDAL FIELD AT ANANDNAGAR |
150000 |
CONSTRUCTION OF COVER DRAIN FROM BANDH NALA TO AMAR MONDAL FIELD AT ANANDNAGAR1 |
Roof laid |
-
latitude : 23.86586958,23.86586958,23.86615228
Longitude : 87.30282446,87.30282446,87.30281764
file name : Image_12022024145155600.png
|
2024-02-12 14:51:55.709572 |
251 |
56724020 |
CONSTRUCTION OF COVER DRAIN FROM BANDH NALA TO AMAR MONDAL FIELD AT ANANDNAGAR |
150000 |
CONSTRUCTION OF COVER DRAIN FROM BANDH NALA TO AMAR MONDAL FIELD AT ANANDNAGAR1 |
Roof laid |
-
latitude : 23.86602686,23.86602718,23.86602773
Longitude : 87.30285073,87.30285073,87.30285006
file name : Image_12022024144851667.png
|
2024-02-12 14:48:51.786893 |
252 |
56724020 |
CONSTRUCTION OF COVER DRAIN FROM BANDH NALA TO AMAR MONDAL FIELD AT ANANDNAGAR |
150000 |
CONSTRUCTION OF COVER DRAIN FROM BANDH NALA TO AMAR MONDAL FIELD AT ANANDNAGAR1 |
Plinth level |
-
latitude : 23.86601469,23.86601472
Longitude : 87.30284142,87.3028414
file name : Image_12022024144052013.png
|
2024-02-12 14:40:52.125308 |
253 |
56724020 |
CONSTRUCTION OF COVER DRAIN FROM BANDH NALA TO AMAR MONDAL FIELD AT ANANDNAGAR |
150000 |
CONSTRUCTION OF COVER DRAIN FROM BANDH NALA TO AMAR MONDAL FIELD AT ANANDNAGAR1 |
Completion of work |
-
latitude : 23.86601463,23.86601063
Longitude : 87.30287938,87.30287852
file name : Image_12022024143628490.png
|
2024-02-12 14:36:28.632205 |
254 |
68643393 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.8220129
Longitude : 87.2935605
file name : Image_07122023141426999.png
|
2023-12-07 14:14:27.091277 |
255 |
68637646 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.82097253
Longitude : 87.29017367
file name : Image_12022024160714599.png
|
2024-02-12 16:07:14.702609 |
256 |
68637646 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.82087419
Longitude : 87.29016216
file name : Image_12022024160634575.png
|
2024-02-12 16:06:34.684916 |
257 |
68637646 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.82088378
Longitude : 87.29016812
file name : Image_12022024160453995.png
|
2024-02-12 16:04:54.098133 |
258 |
68637646 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.82088364
Longitude : 87.29020779
file name : Image_12022024154905125.png
|
2024-02-12 15:49:05.224247 |
259 |
68640843 |
Creation of a new source of drinking water |
85000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.83884457
Longitude : 87.25014966
file name : Image_23022024162020579.png
|
2024-02-23 16:20:20.765676 |
260 |
68640843 |
Creation of a new source of drinking water |
85000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.83886399
Longitude : 87.25014491
file name : Image_23022024161752594.png
|
2024-02-23 16:17:52.719512 |
261 |
68640843 |
Creation of a new source of drinking water |
85000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.83885983
Longitude : 87.25013666
file name : Image_23022024161353779.png
|
2024-02-23 16:13:53.921268 |
262 |
68636575 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.83507331
Longitude : 87.28913811
file name : Image_23022024170708567.png
|
2024-02-23 17:07:08.665467 |
263 |
68636575 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.83506884
Longitude : 87.28916086
file name : Image_23022024170633751.png
|
2024-02-23 17:06:33.835738 |
264 |
68636575 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.83502528
Longitude : 87.28935082
file name : Image_23022024170318916.png
|
2024-02-23 17:03:19.029332 |
265 |
68636575 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.83501748
Longitude : 87.28933648
file name : Image_23022024165709097.png
|
2024-02-23 16:57:09.083047 |
266 |
68619396 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.84110052,23.84110398,23.84110398,23.8411055
Longitude : 87.28568887,87.28568541,87.28568541,87.28568362
file name : Image_13062024171906211.png
|
2024-06-13 17:19:06.312952 |
267 |
68619396 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.84112912,23.84112912,23.84112912,23.84112912,23.84112925
Longitude : 87.28565532,87.28565532,87.28565532,87.28565532,87.28565528
file name : Image_13062024171254573.png
|
2024-06-13 17:12:54.667209 |
268 |
68619396 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.84112224,23.84112224,23.84112224
Longitude : 87.28566488,87.28566488,87.28566488
file name : Image_13062024170625913.png
|
2024-06-13 17:06:26.00677 |
269 |
68619396 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.84112605,23.8411296
Longitude : 87.28565715,87.28565721
file name : Image_13062024165009511.png
|
2024-06-13 16:50:09.626084 |
270 |
56724486 |
CONSTRUCTION OF COVER DRAIN FROM PRIMARY SCHOOL TO TATIGORE AT PARATIA |
140000 |
CONSTRUCTION OF COVER DRAIN FROM PRIMARY SCHOOL TO TATIGORE AT PARATIA1 |
Roof laid |
-
latitude : 23.83740669,23.83740731,23.83740731,23.83740731,23.83740779
Longitude : 87.29503319,87.29503261,87.29503261,87.29503261,87.29503303
file name : Image_13062024173239061.png
|
2024-06-13 17:32:39.143803 |
271 |
56724486 |
CONSTRUCTION OF COVER DRAIN FROM PRIMARY SCHOOL TO TATIGORE AT PARATIA |
140000 |
CONSTRUCTION OF COVER DRAIN FROM PRIMARY SCHOOL TO TATIGORE AT PARATIA1 |
Roof laid |
-
latitude : 23.8374366,23.83744207,23.83744207,23.8374467
Longitude : 87.29501425,87.29500845,87.29500845,87.29500432
file name : Image_13062024173116109.png
|
2024-06-13 17:31:16.208325 |
272 |
56724486 |
CONSTRUCTION OF COVER DRAIN FROM PRIMARY SCHOOL TO TATIGORE AT PARATIA |
140000 |
CONSTRUCTION OF COVER DRAIN FROM PRIMARY SCHOOL TO TATIGORE AT PARATIA1 |
Plinth level |
-
latitude : 23.83740501,23.83740742,23.83740742,23.8374098
Longitude : 87.29504566,87.29504528,87.29504528,87.29504523
file name : Image_13062024172646223.png
|
2024-06-13 17:26:46.312124 |
273 |
56724486 |
CONSTRUCTION OF COVER DRAIN FROM PRIMARY SCHOOL TO TATIGORE AT PARATIA |
140000 |
CONSTRUCTION OF COVER DRAIN FROM PRIMARY SCHOOL TO TATIGORE AT PARATIA1 |
Completion of work |
-
latitude : 23.83742739,23.83742739,23.8374274
Longitude : 87.29504288,87.29504288,87.29504286
file name : Image_13062024172139314.png
|
2024-06-13 17:21:39.399588 |
274 |
56724486 |
CONSTRUCTION OF COVER DRAIN FROM PRIMARY SCHOOL TO TATIGORE AT PARATIA |
140000 |
CONSTRUCTION OF COVER DRAIN FROM PRIMARY SCHOOL TO TATIGORE AT PARATIA1 |
Completion of work |
-
latitude : 23.8373852,23.83742714
Longitude : 87.29504311,87.29502556
file name : Image_13062024172105262.png
|
2024-06-13 17:21:05.351528 |
275 |
68637246 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.8374503
Longitude : 87.2850413
file name : Image_21062024135445588.png
|
2024-06-21 13:54:45.676507 |
276 |
68637246 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.8374503
Longitude : 87.2850413
file name : Image_21062024134825169.png
|
2024-06-21 13:48:25.318653 |
277 |
68637246 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.8374503
Longitude : 87.2850413
file name : Image_21062024134134755.png
|
2024-06-21 13:41:34.865136 |
278 |
68618964 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.8374503,23.8374503
Longitude : 87.2850413,87.2850413
file name : Image_21062024132910925.png
|
2024-06-21 13:29:11.032213 |
279 |
68618964 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.8374454,23.8374454
Longitude : 87.2850493,87.2850493
file name : Image_21062024132446676.png
|
2024-06-21 13:24:46.662576 |
280 |
68618964 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.83657,23.836571666666668
Longitude : 87.28522999999998,87.28522833333334
file name : Image_21062024132002039.png
|
2024-06-21 13:20:02.148317 |
281 |
68636959 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.840053333333337
Longitude : 87.28624999999998
file name : Image_24062024141237180.png
|
2024-06-24 14:12:37.274109 |
282 |
68636959 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.840063333333333
Longitude : 87.28626333333335
file name : Image_24062024141230692.png
|
2024-06-24 14:12:30.630201 |
283 |
68636959 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.838042
Longitude : 87.2854229
file name : Image_24062024140625855.png
|
2024-06-24 14:06:25.951591 |
284 |
68636959 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.840096666666668
Longitude : 87.28630833333334
file name : Image_24062024135640960.png
|
2024-06-24 13:56:41.053496 |