1 |
34809032 |
CONSTRUCTION OF CONCRETE ROAD FROM ACHINTA GHOSH HOUSE TOWARDS LALA DAS HOUSE AT INDUS IV |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM ACHINTA GHOSH HOUSE TOWARDS LALA DAS HOUSE AT INDUS IV1 |
Roof laid |
-
latitude : 23.766784267500043,23.766784267500043
Longitude : 87.80045600607991,87.80045600607991
file name : Image_16122020113508107.png
|
2020-12-16 11:35:08.201368 |
2 |
34809032 |
CONSTRUCTION OF CONCRETE ROAD FROM ACHINTA GHOSH HOUSE TOWARDS LALA DAS HOUSE AT INDUS IV |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM ACHINTA GHOSH HOUSE TOWARDS LALA DAS HOUSE AT INDUS IV1 |
Plinth level |
-
latitude : 23.766788206994534,23.766787578351796
Longitude : 87.80043127946556,87.8004459477961
file name : Image_15122020113047484.png
|
2020-12-15 11:30:47.575733 |
3 |
34805878 |
CONSTRUCTION OF CONCRETE ROAD FROM UTTAM DAS HOUSE TOWARDS BANDANA HOUSE AT INDUS IV |
140000 |
CONSTRUCTION OF CONCRETE ROAD FROM UTTAM DAS HOUSE TOWARDS BANDANA HOUSE AT INDUS IV1 |
Roof laid |
-
latitude : 23.763783839531243,23.763784845359623
Longitude : 87.79909671284258,87.79909905977547
file name : Image_16122020113051865.png
|
2020-12-16 11:30:51.955286 |
4 |
34805878 |
CONSTRUCTION OF CONCRETE ROAD FROM UTTAM DAS HOUSE TOWARDS BANDANA HOUSE AT INDUS IV |
140000 |
CONSTRUCTION OF CONCRETE ROAD FROM UTTAM DAS HOUSE TOWARDS BANDANA HOUSE AT INDUS IV1 |
Plinth level |
-
latitude : 23.763742013834417,23.763742013834417
Longitude : 87.7990409731865,87.7990409731865
file name : Image_15122020112011382.png
|
2020-12-15 11:20:11.45521 |
5 |
34736234 |
CONSTRUCTION OF CONCRETE ROAD FROM DEBABRATA HOUSE TOWARDS DEBASIS BARI AT PURBA KADIPUR |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM DEBABRATA HOUSE TOWARDS DEBASIS BARI AT PURBA KADIPUR 1 |
Roof laid |
-
latitude : 23.786462168209255,23.786462168209255
Longitude : 87.81808557920158,87.81808557920158
file name : Image_16122020114359140.png
|
2020-12-16 11:43:59.234455 |
6 |
34736234 |
CONSTRUCTION OF CONCRETE ROAD FROM DEBABRATA HOUSE TOWARDS DEBASIS BARI AT PURBA KADIPUR |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM DEBABRATA HOUSE TOWARDS DEBASIS BARI AT PURBA KADIPUR 1 |
Plinth level |
-
latitude : 23.769040927290916,23.769040927290916
Longitude : 87.80033807270229,87.80033807270229
file name : Image_15122020114003482.png
|
2020-12-15 11:40:03.5646 |
7 |
34810925 |
CONSTRUCTION OF CONCRETE ROAD FROM ANUP GHOSAL HOUSE TOWARDS MITHUN DAS HOUSE AT INDUS V |
150000 |
CONSTRUCTION OF CONCRETE ROAD FROM ANUP GHOSAL HOUSE TOWARDS MITHUN DAS HOUSE AT INDUS V1 |
Roof laid |
-
latitude : 23.768460899591446,23.768460899591446
Longitude : 87.79999961145222,87.79999961145222
file name : Image_16122020113744386.png
|
2020-12-16 11:37:44.470754 |
8 |
34810925 |
CONSTRUCTION OF CONCRETE ROAD FROM ANUP GHOSAL HOUSE TOWARDS MITHUN DAS HOUSE AT INDUS V |
150000 |
CONSTRUCTION OF CONCRETE ROAD FROM ANUP GHOSAL HOUSE TOWARDS MITHUN DAS HOUSE AT INDUS V1 |
Plinth level |
-
latitude : 23.768509849905968,23.768509849905968
Longitude : 87.79997698031366,87.79997698031366
file name : Image_15122020113330679.png
|
2020-12-15 11:33:30.754776 |
9 |
34865020 |
CONSTRUCTION OF CONCRETE ROAD FROM DURGA TALA TOWARDS MINATI DAS BAIRGYA HOUSE AT LOHADDA |
150000 |
CONSTRUCTION OF CONCRETE ROAD FROM DURGA TALA TOWARDS MINATI DAS BAIRGYA HOUSE AT LOHADDA1 |
Plinth level |
-
latitude : 23.795426823198795,23.795426823198795
Longitude : 87.83277955837548,87.83277955837548
file name : Image_11032021221721970.png
|
2021-03-11 22:17:22.039455 |
10 |
68281476 |
Installation of Computer with Internet facility |
100000 |
Installation of Computer with Internet facility1 |
|
-
latitude : 23.7899087
Longitude : 87.8337021
file name : Image_23082024170907203.png
|
2024-08-23 17:09:07.270215 |
11 |
47476939 |
CONSTRUCTION OF CONCRETE ROAD FROM PRIMARY SCHOOL TOWARD NIRAN HAZRA HOUSE AT PUTUNDI |
175000 |
CONSTRUCTION OF CONCRETE ROAD FROM PRIMARY SCHOOL TOWARD NIRAN HAZRA HOUSE AT PUTUNDI1 |
Completion of work |
-
latitude : 23.7616731505841,23.7616731505841
Longitude : 87.81446761451662,87.81446761451662
file name : Image_08022022131105718.png
|
2022-02-08 13:11:05.806578 |
12 |
34730115 |
CONSTRUCTION OF CONCRETE ROAD FROM CHANNAI MURMU HOUSE TOWARDS KIRAN HEMBRAM BARI AT DONAIPUR |
70000 |
CONSTRUCTION OF CONCRETE ROAD FROM CHANNAI MURMU HOUSE TOWARDS KIRAN HEMBRAM BARI AT DONAIPUR1 |
Plinth level |
-
latitude : 23.800271437503397,23.800271437503397
Longitude : 87.82544354908168,87.82544354908168
file name : Image_09092021111625084.png
|
2021-09-09 11:16:25.149751 |
13 |
47509689 |
CONSTRUCTION OF CONCRETE ROAD FROM KUMUD DHARA HOUSE TOWARD SHIBTALA AT LOHADDA |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM KUMUD DHARA HOUSE TOWARD SHIBTALA AT LOHADDA 1 |
Plinth level |
-
latitude : 23.796453145332634,23.796453145332634
Longitude : 87.83481108024716,87.83481108024716
file name : Image_15022022120031595.png
|
2022-02-15 12:00:31.683789 |
14 |
47188277 |
CONSTRUCTION OF CONCRETE ROAD FROM PATHIK BAGHDI HOUSE TOWARD KURORAM BAGDI HOUSE AT DONAIPUR |
150000 |
CONSTRUCTION OF CONCRETE ROAD FROM PATHIK BAGHDI HOUSE TOWARD KURORAM BAGDI HOUSE AT DONAIPUR 1 |
Plinth level |
-
latitude : 23.80078809801489,23.80078809801489
Longitude : 87.81794618815184,87.81794618815184
file name : Image_29032022105534727.png
|
2022-03-29 10:55:34.833815 |
15 |
47297212 |
CONSTRUCTION OF CONCRETE ROAD FROM MAIN ROAD TOWARD BIPAD SAHA HOUSE AT PURBA KADIPUR |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM MAIN ROAD TOWARD BIPAD SAHA HOUSE AT PURBA KADIPUR1 |
Plinth level |
-
latitude : 23.78699156921357,23.786991192027926
Longitude : 87.81756883487105,87.81756917014718
file name : Image_31052022122832770.png
|
2022-05-31 12:28:32.853502 |
16 |
47412278 |
CONSTRUCTION OF CONCRETE ROAD FROM JIBAN DAS HOUSE TOWARD SADHAN DAS HOUSE AT INDUS V |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM JIBAN DAS HOUSE TOWARD SADHAN DAS HOUSE AT INDUS V1 |
Plinth level |
-
latitude : 23.769679460674524,23.769679460674524
Longitude : 87.79822876676917,87.79822876676917
file name : Image_22022022200204048.png
|
2022-02-22 20:02:04.160719 |
17 |
34799029 |
CONSTRUCTION OF CONCRETE DRAIN FROM AVIJIT SARKAR HOUSE TOWARDS ASTOM ROY BARI ATPURBA KADIPUR |
125000 |
CONSTRUCTION OF CONCRETE DRAIN FROM AVIJIT SARKAR HOUSE TOWARDS ASTOM ROY BARI ATPURBA KADIPUR1 |
Plinth level |
-
latitude : 23.784233797341585,23.784233797341585
Longitude : 87.81814232468605,87.81814232468605
file name : Image_08112021120034595.png
|
2021-11-08 12:00:34.710116 |
18 |
47605356 |
HIGHBAND WIDTH WIFY DIGITAL NET WORK SERVICE WITH IN GP |
150000 |
HIGHBAND WIDTH WIFY DIGITAL NET WORK SERVICE WITH IN GP1 |
Plinth level |
-
latitude : 23.76618647016585
Longitude : 87.83439584076405
file name : Image_23092021153505985.png
|
2021-09-23 15:35:06.134069 |
19 |
34871545 |
CONSTRUCTION OF CC DRAIN FROM NITAI PAL HOUSE TOWARDS SUKUMAR HOUSE AT MILANPUR |
150000 |
CONSTRUCTION OF CC DRAIN FROM NITAI PAL HOUSE TOWARDS SUKUMAR HOUSE AT MILANPUR1 |
Plinth level |
-
latitude : 23.784204334951937,23.784204334951937
Longitude : 87.79579726047814,87.79579726047814
file name : Image_26102021144909897.png
|
2021-10-26 14:49:09.99347 |
20 |
34872020 |
CONSTRUCTION OF CC DRAIN FROM BUDDHADEB DAS HOUSE TOWARDS ASHIS THAKUR HOUSE AT MILANPUR |
150000 |
CONSTRUCTION OF CC DRAIN FROM BUDDHADEB DAS HOUSE TOWARDS ASHIS THAKUR HOUSE AT MILANPUR1 |
Plinth level |
-
latitude : 23.784226295538247,23.78421837463975
Longitude : 87.79582944698632,87.79584193602204
file name : Image_26102021144913331.png
|
2021-10-26 14:49:13.428067 |
21 |
34872883 |
CONSTRUCTION OF CCE DRAIN FROM SHIB SANKAR HOUSE TOWARDS HEMANTA HOUSE AT SAHURAPUR |
150000 |
CONSTRUCTION OF CCE DRAIN FROM SHIB SANKAR HOUSE TOWARDS HEMANTA HOUSE AT SAHURAPUR1 |
Plinth level |
-
latitude : 23.78181557636708,23.78181557636708
Longitude : 87.80092514120042,87.80092514120042
file name : Image_08112021121729584.png
|
2021-11-08 12:17:29.676751 |
22 |
34876144 |
CONSTRUCTION OF CONCRETE DRAIN FROM KULU PUKUR DHAR TOWARDS BELTALA AT MAHESHPUR |
150000 |
CONSTRUCTION OF CONCRETE DRAIN FROM KULU PUKUR DHAR TOWARDS BELTALA AT MAHESHPUR1 |
Plinth level |
-
latitude : 23.779682843014598,23.779682843014598
Longitude : 87.83652794547379,87.83652794547379
file name : Image_07102021111830474.png
|
2021-10-07 11:18:30.654085 |
23 |
34880209 |
CONSTRUCTION OF CONCRETE DRAIN FROM SHYAMAL MONDAL HOUSE TOWARDS KANDAR DHAR AT RANIPARA |
100000 |
CONSTRUCTION OF CONCRETE DRAIN FROM SHYAMAL MONDAL HOUSE TOWARDS KANDAR DHAR AT RANIPARA1 |
Plinth level |
-
latitude : 23.775051380507648,23.775051380507648
Longitude : 87.84510204568505,87.84510204568505
file name : Image_18012022114227850.png
|
2022-01-18 11:42:27.920496 |
24 |
34720215 |
CONSTRUCTION OF CONCRETE ROAD FROM FATIK BAGDI HOUSE TOWARDS BIJAY BAGDI BARI AT DONAIPUR |
150000 |
CONSTRUCTION OF CONCRETE ROAD FROM FATIK BAGDI HOUSE TOWARDS BIJAY BAGDI BARI AT DONAIPUR1 |
Plinth level |
-
latitude : 23.80027101840824,23.80027101840824
Longitude : 87.81780553981662,87.81780553981662
file name : Image_27102021122405600.png
|
2021-10-27 12:24:05.681189 |
25 |
34802694 |
CONSTRUCTION OF CONCRETE ROAD FROM KATICK PAL BAGAN TOWARDS KALI TALA AT INDUS III |
157142 |
CONSTRUCTION OF CONCRETE ROAD FROM KATICK PAL BAGAN TOWARDS KALI TALA AT INDUS III1 |
Plinth level |
-
latitude : 23.765360517427325,23.765360517427325
Longitude : 87.8031284082681,87.8031284082681
file name : Image_29102021134956357.png
|
2021-10-29 13:49:56.469647 |
26 |
34807119 |
CONSTRUCTION OF CONCRETE ROAD FROM JOYTIRMOY DAS HOUSE TOWARDS ANATH DAS HOUSE AT INDUS IV |
70000 |
CONSTRUCTION OF CONCRETE ROAD FROM JOYTIRMOY DAS HOUSE TOWARDS ANATH DAS HOUSE AT INDUS IV1 |
Plinth level |
-
latitude : 23.764526811428368,23.764526811428368
Longitude : 87.79827821999788,87.79827821999788
file name : Image_01112021154259679.png
|
2021-11-01 15:42:59.76877 |
27 |
34811891 |
CONSTRUCTION OF CONCRETE ROAD FROM SHANTI DAS HOUSE TOWARDSNABA KUMAR HOUSE AT INDUS V |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM SHANTI DAS HOUSE TOWARDSNABA KUMAR HOUSE AT INDUS V1 |
Plinth level |
-
latitude : 23.76952573657036,23.76952573657036
Longitude : 87.80072347261012,87.80072347261012
file name : Image_29102021135000121.png
|
2021-10-29 13:50:00.226277 |
28 |
34833643 |
CONSTRUCTION OF CC ROAD FROM NABA MONDAL HOUSE TOWARDS BIJAY MONDAL HOUSE AT PURBA SAHAPUR |
150000 |
CONSTRUCTION OF CC ROAD FROM NABA MONDAL HOUSE TOWARDS BIJAY MONDAL HOUSE AT PURBA SAHAPUR1 |
Plinth level |
-
latitude : 23.791003064252436,23.791003064252436
Longitude : 87.8582759667188,87.8582759667188
file name : Image_28122021113434509.png
|
2021-12-28 11:34:34.624693 |
29 |
34882983 |
CONSTRUCTION OF CC ROAD FROM SURI PUKUR DHAR TOWARDS BRINCHI HOUSE AT DWARONDA |
100000 |
CONSTRUCTION OF CC ROAD FROM SURI PUKUR DHAR TOWARDS BRINCHI HOUSE AT DWARONDA1 |
Plinth level |
-
latitude : 23.77093913499266,23.77093913499266
Longitude : 87.838254282251,87.838254282251
file name : Image_24112021152558490.png
|
2021-11-24 15:25:58.569294 |
30 |
58682445 |
CONSTRUCTION OF CONCRETE DRAIN FROM ADIBASIPARA KANDOR TO JALADHAR MONDAL BARI AT MAHESHPUR |
80000 |
CONSTRUCTION OF CONCRETE DRAIN FROM ADIBASIPARA KANDOR TO JALADHAR MONDAL BARI AT MAHESHPUR1 |
Completion of work |
-
latitude : 23.7897955,23.7897955
Longitude : 87.8338024,87.8338024
file name : Image_16102023151235025.png
|
2023-10-16 15:12:34.991441 |
31 |
58136201 |
CONSTRUCTION OF CONCRETE DRAIN FROM UTTAM DAS BARI TO SUNIL DAS BARI AT PURBA KADIPUR |
75000 |
CONSTRUCTION OF CONCRETE DRAIN FROM UTTAM DAS BARI TO SUNIL DAS BARI AT PURBA KADIPUR1 |
Completion of work |
-
latitude : 23.789796,23.789796
Longitude : 87.8338014,87.8338014
file name : Image_16102023152213285.png
|
2023-10-16 15:22:13.396211 |
32 |
56896239 |
CONSTRUCTION OF CONCRETE ROAD FROM DURGA TALA TO AJAY CHOWDHURY BARI AT CHATRA |
65278 |
CONSTRUCTION OF CONCRETE ROAD FROM DURGA TALA TO AJAY CHOWDHURY BARI AT CHATRA 1 |
Completion of work |
-
latitude : 23.7897812,23.7897812
Longitude : 87.8338148,87.8338148
file name : Image_16102023151856955.png
|
2023-10-16 15:18:57.026538 |
33 |
57127348 |
CONSTRUCTION OF CONCRETE ROAD FROM MAHIT SK BARI TO AMIN SK BARI AT DASKIN DURGAPUR |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM MAHIT SK BARI TO AMIN SK BARI AT DASKIN DURGAPUR 1 |
Completion of work |
-
latitude : 23.7897951,23.7897951
Longitude : 87.8338023,87.8338023
file name : Image_16102023151637049.png
|
2023-10-16 15:16:37.117814 |
34 |
58485074 |
CONSTRUCTION OF CONCRETE DRAIN FROM UJJWAL MONDAL BARI TO SAJAL BAGDI VIA SUKDEB BARI AT SAHURAPUR |
100000 |
CONSTRUCTION OF CONCRETE DRAIN FROM UJJWAL MONDAL BARI TO SAJAL BAGDI VIA SUKDEB BARI AT SAHURAPUR 1 |
Completion of work |
-
latitude : 23.7897969,23.7897969
Longitude : 87.833799,87.833799
file name : Image_16102023152440178.png
|
2023-10-16 15:24:40.282121 |
35 |
34918224 |
HUME PIPE PURCHASE FOR ALL SANSAD |
75000 |
HUME PIPE PURCHASE FOR ALL SANSAD1 |
Plinth level |
-
latitude : 23.7898714,23.7898791
Longitude : 87.8336689,87.8336268
file name : Image_22122021130856467.png
|
2021-12-22 13:08:56.537366 |
36 |
47629896 |
MAINTANANCE OF DRINKING WATER TUBE WEL AT ALL SANSAD |
432141 |
MAINTANANCE OF DRINKING WATER TUBE WEL AT ALL SANSAD1 |
Plinth level |
-
latitude : 23.789889528416097
Longitude : 87.83391488716006
file name : Image_24122021142643461.png
|
2021-12-24 14:26:43.545181 |
37 |
47516518 |
CONSTRUCTION OF CONCRETE ROAD FROM SANTOWARDSH BAGDI HOUSE TOWARD KANAN BAGDI HOUSE AT SURULIA |
50000 |
CONSTRUCTION OF CONCRETE ROAD FROM SANTOWARDSH BAGDI HOUSE TOWARD KANAN BAGDI HOUSE AT SURULIA 1 |
Plinth level |
-
latitude : 23.788034529425204,23.7880347808823
Longitude : 87.84214993938804,87.8421501070261
file name : Image_02032022160633855.png
|
2022-03-02 16:06:33.958523 |
38 |
47514923 |
CONSTRUCTION OF CONCRETE ROAD FROM PAKA RASTA TOWARD BARIPUKUR AT RANIPARA |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM PAKA RASTA TOWARD BARIPUKUR AT RANIPARA 1 |
Plinth level |
-
latitude : 23.776125102303922,23.776125102303922
Longitude : 87.84512140788138,87.84512140788138
file name : Image_02032022162447090.png
|
2022-03-02 16:24:47.171662 |
39 |
47413014 |
CONSTRUCTION OF CONCRETE ROAD FROM CHATRA DAS PARA KALI TALA TOWARD MONORATH DAS HOUSE AT CHATRA |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM CHATRA DAS PARA KALI TALA TOWARD MONORATH DAS HOUSE AT CHATRA1 |
Plinth level |
-
latitude : 23.774009426124394,23.774009426124394
Longitude : 87.81677230261266,87.81677230261266
file name : Image_03022022111019526.png
|
2022-02-03 11:10:19.63011 |
40 |
47676239 |
CONSTRUCTION OF CC DRAIN FROM SOMENATH BHATTACH HOUSE TOWARDS KANTA PUKUR DHAT AT DONAIPUR |
100000 |
CONSTRUCTION OF CC DRAIN FROM SOMENATH BHATTACH HOUSE TOWARDS KANTA PUKUR DHAT AT DONAIPUR1 |
Plinth level |
-
latitude : 23.656425615772605,23.656425615772605
Longitude : 87.69707730039954,87.69707730039954
file name : Image_10052022142852326.png
|
2022-05-10 14:28:52.402491 |
41 |
47680619 |
CONSTRUCTION OF CC DRAIN FROM KAYAL GARIYA TOWARDS JITEN KUNAR HOUSE AT KADWA |
1500000 |
CONSTRUCTION OF CC DRAIN FROM KAYAL GARIYA TOWARDS JITEN KUNAR HOUSE AT KADWA1 |
Plinth level |
-
latitude : 23.77954420633614,23.77954420633614
Longitude : 87.80736663378775,87.80736663378775
file name : Image_23062022140415359.png
|
2022-06-23 14:04:15.435502 |
42 |
47686465 |
CONSTRUCTION OF CC DRAIN FROM PARESH KUNDU BARI'S KON TOWARDS KHIRKI PUKUR PAR AT PUTUNDI |
100000 |
CONSTRUCTION OF CC DRAIN FROM PARESH KUNDU BARI'S KON TOWARDS KHIRKI PUKUR PAR AT PUTUNDI1 |
Plinth level |
-
latitude : 23.75947302673012,23.75947302673012
Longitude : 87.81477766111493,87.81477766111493
file name : Image_17052022142623208.png
|
2022-05-17 14:26:23.300869 |
43 |
47630638 |
MAINTANCE OF DRINKING WATER AT PANCHAYAT AREA |
300000 |
MAINTANCE OF DRINKING WATER AT PANCHAYAT AREA1 |
Plinth level |
-
latitude : 23.78984082955867
Longitude : 87.83388261683285
file name : Image_31032022134648228.png
|
2022-03-31 13:46:48.326106 |
44 |
47418641 |
CONSTRUCTION OF CONCRETE ROAD FROM SHIBKINKAR MONDAL HOUSE TOWARD ANANDA MONDAL HOUSE AT SAHURAPUR |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM SHIBKINKAR MONDAL HOUSE TOWARD ANANDA MONDAL HOUSE AT SAHURAPUR1 |
Plinth level |
-
latitude : 23.78194457385689,23.78194457385689
Longitude : 87.80116620473564,87.80116620473564
file name : Image_21042022115511587.png
|
2022-04-21 11:55:11.707462 |
45 |
34810317 |
CONSTRUCTION OF CONCRETE GHAT OF INDRAPUKUR DURGA GHAT AT INDUS IV |
120000 |
CONSTRUCTION OF CONCRETE GHAT OF INDRAPUKUR DURGA GHAT AT INDUS IV1 |
Completion of work |
-
latitude : 23.76802357379347,23.76802357379347
Longitude : 87.7996226772666,87.7996226772666
file name : Image_08082022135720035.png
|
2022-08-08 13:57:20.122638 |
46 |
47604630 |
CONSTRUCTION OF CC ROAD FROM ICDS CENTRE TOWARDS MANIK DAS HOUSE AT PURBA SAHAPUR |
100000 |
CONSTRUCTION OF CC ROAD FROM ICDS CENTRE TOWARDS MANIK DAS HOUSE AT PURBA SAHAPUR 1 |
Completion of work |
-
latitude : 23.7900004,23.7900426
Longitude : 87.8337746,87.8337524
file name : Image_28042023165205752.png
|
2023-04-28 16:52:05.856088 |
47 |
47338326 |
CONSTRUCTION OF CONCRETE ROAD FROM ASHIS SARKAR HOUSE TOWARD AJAY SARKAR HOUSE AT INDUS III |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM ASHIS SARKAR HOUSE TOWARD AJAY SARKAR HOUSE AT INDUS III1 |
Completion of work |
-
latitude : 23.76713052392006,23.76713052392006
Longitude : 87.80223648995161,87.80223648995161
file name : Image_30082022124557393.png
|
2022-08-30 12:45:57.473166 |
48 |
47339394 |
CONSTRUCTION OF CONCRETE ROAD FROM SANU DAS HOUSE NIMAI DAS HOUSE AT INDUS IV |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM SANU DAS HOUSE NIMAI DAS HOUSE AT INDUS IV1 |
Completion of work |
-
latitude : 23.763762381859124,23.763762381859124
Longitude : 87.79929913580418,87.79929913580418
file name : Image_19112022093359601.png
|
2022-11-19 09:33:59.692643 |
49 |
68278887 |
Construction of roads |
60000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.7899401,23.7899401
Longitude : 87.8337123,87.8337123
file name : Image_27082024130357446.png
|
2024-08-27 13:03:57.576317 |
50 |
68278887 |
Construction of roads |
60000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.7899233,23.7899233
Longitude : 87.8337073,87.8337073
file name : Image_27082024123608399.png
|
2024-08-27 12:36:08.957438 |
51 |
68278887 |
Construction of roads |
60000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.7899388,23.7899388
Longitude : 87.8337095,87.8337095
file name : Image_27082024123032826.png
|
2024-08-27 12:30:33.321955 |
52 |
47515400 |
CONSTRUCTION OF CONCRETE ROAD FROM MIHIR MONDAL HOUSE TOWARD PANKAJ MONDAL HOUSE AT DWARONDA |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM MIHIR MONDAL HOUSE TOWARD PANKAJ MONDAL HOUSE AT DWARONDA1 |
Plinth level |
-
latitude : 23.770354874432087,23.770354874432087
Longitude : 87.83879910595715,87.83879910595715
file name : Image_14112022094120826.png
|
2022-11-14 09:41:20.902935 |
53 |
47515400 |
CONSTRUCTION OF CONCRETE ROAD FROM MIHIR MONDAL HOUSE TOWARD PANKAJ MONDAL HOUSE AT DWARONDA |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM MIHIR MONDAL HOUSE TOWARD PANKAJ MONDAL HOUSE AT DWARONDA1 |
Plinth level |
-
latitude : 23.77039418555796,23.770400723442435
Longitude : 87.83871604129672,87.83871000632644
file name : Image_14112022095440961.png
|
2022-11-14 09:54:41.062995 |
54 |
47515400 |
CONSTRUCTION OF CONCRETE ROAD FROM MIHIR MONDAL HOUSE TOWARD PANKAJ MONDAL HOUSE AT DWARONDA |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM MIHIR MONDAL HOUSE TOWARD PANKAJ MONDAL HOUSE AT DWARONDA1 |
Plinth level |
-
latitude : 23.77030437346548,23.77030437346548
Longitude : 87.83883891999722,87.83883891999722
file name : Image_14112022094911319.png
|
2022-11-14 09:49:11.400999 |
55 |
47418440 |
CONSTRUCTION OF CONCRETE ROAD FROM ASHIS CHATTERJEE HOUSE TOWARD FOOTBALL GROUND CONCRETE ROAD AT M |
125000 |
CONSTRUCTION OF CONCRETE ROAD FROM ASHIS CHATTERJEE HOUSE TOWARD FOOTBALL GROUND CONCRETE ROAD AT M1 |
Completion of work |
-
latitude : 23.784970985725522,23.784970985725522
Longitude : 87.79472823254764,87.79472823254764
file name : Image_11112022105641725.png
|
2022-11-11 10:56:41.823142 |
56 |
47418440 |
CONSTRUCTION OF CONCRETE ROAD FROM ASHIS CHATTERJEE HOUSE TOWARD FOOTBALL GROUND CONCRETE ROAD AT M |
125000 |
CONSTRUCTION OF CONCRETE ROAD FROM ASHIS CHATTERJEE HOUSE TOWARD FOOTBALL GROUND CONCRETE ROAD AT M1 |
Completion of work |
-
latitude : 23.784930375404656,23.784930375404656
Longitude : 87.79474139213562,87.79474139213562
file name : Image_11112022105652983.png
|
2022-11-11 10:56:53.076553 |
57 |
47296746 |
CONSTRUCTION OF CONCRETE ROAD FROM SOMNATH DAS HOUSE TOWARD MANIK DAS HOUSE AT DONAIPUR |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM SOMNATH DAS HOUSE TOWARD MANIK DAS HOUSE AT DONAIPUR 1 |
Plinth level |
-
latitude : 23.801139341667295,23.801139341667295
Longitude : 87.81855404376984,87.81855404376984
file name : Image_16112022101456185.png
|
2022-11-16 10:14:56.270374 |
58 |
47516303 |
CONSTRUCTION OF CONCRETE ROAD FROM CHAND SEKH HOUSE TOWARD SAONAD SEKH HOUSE AT DULA SAHAPUR |
50000 |
CONSTRUCTION OF CONCRETE ROAD FROM CHAND SEKH HOUSE TOWARD SAONAD SEKH HOUSE AT DULA SAHAPUR 1 |
Plinth level |
-
latitude : 23.791724075563252,23.791724075563252
Longitude : 87.84844952635467,87.84844952635467
file name : Image_30012023140902946.png
|
2023-01-30 14:09:03.015512 |
59 |
47696159 |
CONSTRUCTION OF CC DRAIN FROM BANKIM CHAKRABORTY HOUSE TOWARDS BURO PUKUR AT DWARONDA |
75000 |
CONSTRUCTION OF CC DRAIN FROM BANKIM CHAKRABORTY HOUSE TOWARDS BURO PUKUR AT DWARONDA1 |
Roof laid |
-
latitude : 23.769413251429796,23.769413251429796
Longitude : 87.83899432048202,87.83899432048202
file name : Image_12122022135910527.png
|
2022-12-12 13:59:10.629544 |
60 |
47695432 |
CONSTRUCTION OF CC DRAIN FROM ATUL BAGDI BARI TOWARDS SAKSHI GOPAL DAS BAIRGYA BARI AT MAKAIPUR |
75000 |
CONSTRUCTION OF CC DRAIN FROM ATUL BAGDI BARI TOWARDS SAKSHI GOPAL DAS BAIRGYA BARI AT MAKAIPUR1 |
Roof laid |
-
latitude : 23.791928426362574,23.791928426362574
Longitude : 87.83724501729012,87.83724501729012
file name : Image_14122022123910715.png
|
2022-12-14 12:39:10.805257 |
61 |
47695432 |
CONSTRUCTION OF CC DRAIN FROM ATUL BAGDI BARI TOWARDS SAKSHI GOPAL DAS BAIRGYA BARI AT MAKAIPUR |
75000 |
CONSTRUCTION OF CC DRAIN FROM ATUL BAGDI BARI TOWARDS SAKSHI GOPAL DAS BAIRGYA BARI AT MAKAIPUR1 |
Completion of work |
-
latitude : 23.792158593423665,23.79216521512717
Longitude : 87.83722632564604,87.83722456544638
file name : Image_01122022110739576.png
|
2022-12-01 11:07:39.646302 |
62 |
47603803 |
CONSTRUCTION OF CONCRETE ROAD FROM ASTOM MAJHIS MANDIR TOWARDS DILIP MAJHI HOUSE AT KOTAL GHOSA |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM ASTOM MAJHIS MANDIR TOWARDS DILIP MAJHI HOUSE AT KOTAL GHOSA 1 |
Completion of work |
-
latitude : 23.78368671052158,23.78368671052158
Longitude : 87.8585138451308,87.8585138451308
file name : Image_14122022130618496.png
|
2022-12-14 13:06:18.571594 |
63 |
47691464 |
CONSTRUCTION OF CC DRAIN FROM PRASANTA DAS SHOP TOWARDS MADHAB MONDAL BARI AT NOWAPARA |
75000 |
CONSTRUCTION OF CC DRAIN FROM PRASANTA DAS SHOP TOWARDS MADHAB MONDAL BARI AT NOWAPARA1 |
Roof laid |
-
latitude : 23.78422139212489,23.78422139212489
Longitude : 87.83229583874345,87.83229583874345
file name : Image_02012023121043510.png
|
2023-01-02 12:10:43.580973 |
64 |
47679082 |
CONSTRUCTION OF CC DRAIN FROM PRADIP GHOSH BARI TOWARDS KHIRKI PUKUR PAR AT INDUS IV |
100000 |
CONSTRUCTION OF CC DRAIN FROM PRADIP GHOSH BARI TOWARDS KHIRKI PUKUR PAR AT INDUS IV1 |
Plinth level |
-
latitude : 23.7677624,23.7677624
Longitude : 87.800733,87.800733
file name : Image_30012023121711797.png
|
2023-01-30 12:17:11.86559 |
65 |
47297910 |
CONSTRUCTION OF CONCRETE ROAD FROM SANNYASI DAS HOUSE TOWARD SARO DAS HOUSE AT INDUS III |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM SANNYASI DAS HOUSE TOWARD SARO DAS HOUSE AT INDUS III1 |
Roof laid |
-
latitude : 23.765372587367892,23.765372587367892
Longitude : 87.80571640469134,87.80571640469134
file name : Image_27012023160756683.png
|
2023-01-27 16:07:56.758518 |
66 |
47685620 |
CONSTRUCTION OF CC DRAIN FROM SUKHRAM HOUSE TOWARDS SISIR MONDAL HOUSEAT DENGRA |
125000 |
CONSTRUCTION OF CC DRAIN FROM SUKHRAM HOUSE TOWARDS SISIR MONDAL HOUSEAT DENGRA1 |
Plinth level |
-
latitude : 23.76522548496723,23.76522548496723
Longitude : 87.8053986467421,87.8053986467421
file name : Image_27012023161250041.png
|
2023-01-27 16:12:50.118341 |
67 |
47734591 |
CONSTRUCTION CC DRAIN FROM SUKHEN MONDAL HOUSE TOWARDS ASHA NANDA MUKHERJEE LAND AT SURULIA |
75000 |
CONSTRUCTION CC DRAIN FROM SUKHEN MONDAL HOUSE TOWARDS ASHA NANDA MUKHERJEE LAND AT SURULIA 1 |
Completion of work |
-
latitude : 23.78777787555009,23.78777787555009
Longitude : 87.8431773930788,87.8431773930788
file name : Image_30012023131104100.png
|
2023-01-30 13:11:04.173419 |
68 |
47511368 |
CONSTRUCTION OF CONCRETE ROAD FROM BAGDI PARA TOWARD LONA MATH AT LOHADDA |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM BAGDI PARA TOWARD LONA MATH AT LOHADDA 1 |
Roof laid |
-
latitude : 23.7899779,23.7899779
Longitude : 87.833689,87.833689
file name : Image_30012023160112423.png
|
2023-01-30 16:01:12.497452 |
69 |
47684658 |
CONSTRUCTION OF CC DRAIN FROM NITAI PAL HOUSE TOWARDS ASHIS CHATTERJEE HOUSE AT MILANPUR |
125000 |
CONSTRUCTION OF CC DRAIN FROM NITAI PAL HOUSE TOWARDS ASHIS CHATTERJEE HOUSE AT MILANPUR1 |
Roof laid |
-
latitude : 23.7899431,23.7899431
Longitude : 87.833713,87.833713
file name : Image_30012023155342950.png
|
2023-01-30 15:53:43.029798 |
70 |
47735254 |
CONSTRUCTION OF CC DRAIN FROM MASJID TOWARDS RABAI SK HOUSE AT DULA SAHAPUR |
75000 |
CONSTRUCTION OF CC DRAIN FROM MASJID TOWARDS RABAI SK HOUSE AT DULA SAHAPUR1 |
Roof laid |
-
latitude : 23.7899567,23.7899567
Longitude : 87.8337051,87.8337051
file name : Image_30012023155200648.png
|
2023-01-30 15:52:00.727478 |
71 |
47477624 |
CONSTRUCTION OF CONCRETE ROAD FROM GOPI BANERJEE HOUSE TOWARD SASTITALA AT RADHAKRISHNAPUR |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM GOPI BANERJEE HOUSE TOWARD SASTITALA AT RADHAKRISHNAPUR1 |
Roof laid |
-
latitude : 23.785100444220006,23.785100444220006
Longitude : 87.81660726293921,87.81660726293921
file name : Image_04022023091810465.png
|
2023-02-04 09:18:10.527591 |
72 |
47670653 |
CONSTRUCTION OF TUBE WELL PLAT FORM AT ALL SANSAD |
150000 |
CONSTRUCTION OF TUBE WELL PLAT FORM AT ALL SANSAD1 |
Roof laid |
-
latitude : 23.7899386
Longitude : 87.8337043
file name : Image_09022023135139305.png
|
2023-02-09 13:51:39.393966 |
73 |
107175634 |
Repair of pipe drinking water |
200000 |
Repair of pipe drinking water1 |
Plinth level |
-
latitude : 23.7899074
Longitude : 87.8337025
file name : Image_28082024164545015.png
|
2024-08-28 16:45:45.676043 |
74 |
107175634 |
Repair of pipe drinking water |
200000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 23.7899281
Longitude : 87.8337082
file name : Image_28082024163543222.png
|
2024-08-28 16:35:43.745571 |
75 |
47690131 |
CONSTRUCTION OF CC DRAIN FROM TIRU DAS HOUSE TOWARDS JIBAN DALUI HOUSE AT MAHESHPUR |
75000 |
CONSTRUCTION OF CC DRAIN FROM TIRU DAS HOUSE TOWARDS JIBAN DALUI HOUSE AT MAHESHPUR1 |
Plinth level |
-
latitude : 23.780947546474636,23.780947546474636
Longitude : 87.8350371401757,87.8350371401757
file name : Image_17022023132806814.png
|
2023-02-17 13:28:06.892589 |
76 |
47630200 |
MAINTANCE OF TUBE WELL AT ALL SANSAD |
400000 |
MAINTANCE OF TUBE WELL AT ALL SANSAD1 |
Completion of work |
-
latitude : 23.7899749
Longitude : 87.8337109
file name : Image_08072024165729473.png
|
2024-07-08 16:57:29.109215 |
77 |
47630200 |
MAINTANCE OF TUBE WELL AT ALL SANSAD |
400000 |
MAINTANCE OF TUBE WELL AT ALL SANSAD1 |
Completion of work |
-
latitude : 23.7899282
Longitude : 87.8337085
file name : Image_08072024165503847.png
|
2024-07-08 16:55:03.927335 |
78 |
47630200 |
MAINTANCE OF TUBE WELL AT ALL SANSAD |
400000 |
MAINTANCE OF TUBE WELL AT ALL SANSAD1 |
Completion of work |
-
latitude : 23.7899485
Longitude : 87.8337126
file name : Image_08072024165301185.png
|
2024-07-08 16:53:01.26597 |
79 |
47630415 |
MAINTANCE OF DRINKING WATER AT PANCHAYAT AREA |
400000 |
MAINTANCE OF DRINKING WATER AT PANCHAYAT AREA1 |
Plinth level |
-
latitude : 23.7899352
Longitude : 87.8337031
file name : Image_28022023153042677.png
|
2023-02-28 15:30:42.773934 |
80 |
34878948 |
CONSTRUCTION OF CC ROAD FROM SUFAL METE HOUSE TOWARDS SAGAR MONDAL HOUSE AT DWARONDA |
100000 |
CONSTRUCTION OF CC ROAD FROM SUFAL METE HOUSE TOWARDS SAGAR MONDAL HOUSE AT DWARONDA1 |
Roof laid |
-
latitude : 23.758224709890783,23.758224709890783
Longitude : 87.81531695276499,87.81531695276499
file name : Image_27012021111230239.png
|
2021-01-27 11:12:30.304009 |
81 |
34878948 |
CONSTRUCTION OF CC ROAD FROM SUFAL METE HOUSE TOWARDS SAGAR MONDAL HOUSE AT DWARONDA |
100000 |
CONSTRUCTION OF CC ROAD FROM SUFAL METE HOUSE TOWARDS SAGAR MONDAL HOUSE AT DWARONDA1 |
Plinth level |
-
latitude : 23.771217623725533,23.771217623725533
Longitude : 87.83924812451005,87.83924812451005
file name : Image_23012021114809108.png
|
2021-01-23 11:48:09.198418 |
82 |
34868083 |
CONSTRUCTION OF CC ROAD FROM MADHAB MONDAL HOUSE TOWARDS RAICHARAN DALUI HOUSE AT NOWAPARA |
125000 |
CONSTRUCTION OF CC ROAD FROM MADHAB MONDAL HOUSE TOWARDS RAICHARAN DALUI HOUSE AT NOWAPARA1 |
Roof laid |
-
latitude : 23.65639988332987,23.65639988332987
Longitude : 87.69697017967701,87.69697017967701
file name : Image_18022021120211807.png
|
2021-02-18 12:02:11.860631 |
83 |
34868083 |
CONSTRUCTION OF CC ROAD FROM MADHAB MONDAL HOUSE TOWARDS RAICHARAN DALUI HOUSE AT NOWAPARA |
125000 |
CONSTRUCTION OF CC ROAD FROM MADHAB MONDAL HOUSE TOWARDS RAICHARAN DALUI HOUSE AT NOWAPARA1 |
Plinth level |
-
latitude : 23.784081959165633,23.784081959165633
Longitude : 87.83266581594944,87.83266581594944
file name : Image_15022021120228824.png
|
2021-02-15 12:02:28.893062 |
84 |
34825212 |
CONSTRUCTION OF CONCRETE ROAD FROM PRITAM MONDAL HOUSE TOWARDS BATHAN AT PUTUNDI |
125000 |
CONSTRUCTION OF CONCRETE ROAD FROM PRITAM MONDAL HOUSE TOWARDS BATHAN AT PUTUNDI1 |
Plinth level |
-
latitude : 23.75843631103635,23.75843631103635
Longitude : 87.8148018848151,87.8148018848151
file name : Image_27012021111207183.png
|
2021-01-27 11:12:07.259195 |
85 |
34878346 |
CONSTRUCTION OF CC ROAD FROM MUNNDAMALI TALA MANDIR TOWARDS PAKA RASTA AT MAHESHPUR |
75000 |
CONSTRUCTION OF CC ROAD FROM MUNNDAMALI TALA MANDIR TOWARDS PAKA RASTA AT MAHESHPUR1 |
Roof laid |
-
latitude : 23.78042401280254,23.78042401280254
Longitude : 87.8426662646234,87.8426662646234
file name : Image_16122020115610001.png
|
2020-12-16 11:56:10.082926 |
86 |
34878346 |
CONSTRUCTION OF CC ROAD FROM MUNNDAMALI TALA MANDIR TOWARDS PAKA RASTA AT MAHESHPUR |
75000 |
CONSTRUCTION OF CC ROAD FROM MUNNDAMALI TALA MANDIR TOWARDS PAKA RASTA AT MAHESHPUR1 |
Plinth level |
-
latitude : 23.780440567061305,23.780441069975495
Longitude : 87.84262443892658,87.84263273701072
file name : Image_15122020160902740.png
|
2020-12-15 16:09:02.807993 |
87 |
34834228 |
CONSTRUCTION OF CC ROAD FROM GANAPATI DAS HOUSE TOWARDS RAIRANJAN DAS HOUSE AT DULASAHAPUR |
75000 |
CONSTRUCTION OF CC ROAD FROM GANAPATI DAS HOUSE TOWARDS RAIRANJAN DAS HOUSE AT DULASAHAPUR1 |
Roof laid |
-
latitude : 23.789124093018472,23.789124093018472
Longitude : 87.8491388540715,87.8491388540715
file name : Image_16122020122824476.png
|
2020-12-16 12:28:24.553872 |
88 |
34834469 |
CONSTRUCTION OF CC ROAD FROM DILBAHAR HOUSE TOWARDS LALU BABU HOUSE AT DULASAHAPUR |
75000 |
CONSTRUCTION OF CC ROAD FROM DILBAHAR HOUSE TOWARDS LALU BABU HOUSE AT DULASAHAPUR1 |
Roof laid |
-
latitude : 23.792802658863366,23.792802658863366
Longitude : 87.84821441397071,87.84821441397071
file name : Image_16122020122300226.png
|
2020-12-16 12:23:00.295409 |
89 |
34660343 |
CONSTRUCTION OF CONCRETE ROAD FROM DHIRENDRANATH PAL HOUSE TOWARDS DURGATALA AT DONAIPUR |
150000 |
CONSTRUCTION OF CONCRETE ROAD FROM DHIRENDRANATH PAL HOUSE TOWARDS DURGATALA AT DONAIPUR 1 |
Roof laid |
-
latitude : 23.797287605702877,23.797287605702877
Longitude : 87.81875143758953,87.81875143758953
file name : Image_16122020114803387.png
|
2020-12-16 11:48:03.475973 |
90 |
34660343 |
CONSTRUCTION OF CONCRETE ROAD FROM DHIRENDRANATH PAL HOUSE TOWARDS DURGATALA AT DONAIPUR |
150000 |
CONSTRUCTION OF CONCRETE ROAD FROM DHIRENDRANATH PAL HOUSE TOWARDS DURGATALA AT DONAIPUR 1 |
Plinth level |
-
latitude : 23.79724548663944,23.79724548663944
Longitude : 87.81876099295914,87.81876099295914
file name : Image_15122020114601308.png
|
2020-12-15 11:46:01.389817 |
91 |
34832118 |
CONSTRUCTION OF CC ROAD FROM KALICHARAN MONDAL HOUSE TOWARDS NABA GHOSH HOUSE AT P SAHAPUR |
150000 |
CONSTRUCTION OF CC ROAD FROM KALICHARAN MONDAL HOUSE TOWARDS NABA GHOSH HOUSE AT P SAHAPUR1 |
Roof laid |
-
latitude : 23.787371185608208,23.787364773452282
Longitude : 87.85494374111295,87.85495078191161
file name : Image_18022021123627966.png
|
2021-02-18 12:36:28.045517 |
92 |
34832118 |
CONSTRUCTION OF CC ROAD FROM KALICHARAN MONDAL HOUSE TOWARDS NABA GHOSH HOUSE AT P SAHAPUR |
150000 |
CONSTRUCTION OF CC ROAD FROM KALICHARAN MONDAL HOUSE TOWARDS NABA GHOSH HOUSE AT P SAHAPUR1 |
Plinth level |
-
latitude : 23.787217335775495,23.787217335775495
Longitude : 87.85506628453732,87.85506628453732
file name : Image_15022021120241518.png
|
2021-02-15 12:02:41.574423 |
93 |
34824120 |
CONSTRUCTION OF CONCRETE ROAD FROM BHULU HAZRA HOUSE TOWARDS SISTIDHAR DAS HOUSE AT PUTUNDI |
125000 |
CONSTRUCTION OF CONCRETE ROAD FROM BHULU HAZRA HOUSE TOWARDS SISTIDHAR DAS HOUSE AT PUTUNDI1 |
Roof laid |
-
latitude : 23.757909801788628,23.757909801788628
Longitude : 87.81535391695797,87.81535391695797
file name : Image_28012021110557841.png
|
2021-01-28 11:05:57.902071 |
94 |
34824120 |
CONSTRUCTION OF CONCRETE ROAD FROM BHULU HAZRA HOUSE TOWARDS SISTIDHAR DAS HOUSE AT PUTUNDI |
125000 |
CONSTRUCTION OF CONCRETE ROAD FROM BHULU HAZRA HOUSE TOWARDS SISTIDHAR DAS HOUSE AT PUTUNDI1 |
Plinth level |
-
latitude : 23.808358046226203,23.808358046226203
Longitude : 87.80141372233629,87.80141372233629
file name : Image_28012021082258418.png
|
2021-01-28 08:22:58.486695 |
95 |
57128940 |
CONSTRUCTION OF CONCRETE ROAD FROM DURGA TALA TO NAKUL DAS BARI AT LOHADDA |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM DURGA TALA TO NAKUL DAS BARI AT LOHADDA 1 |
Completion of work |
-
latitude : 23.7940781,23.7940781
Longitude : 87.8323918,87.8323918
file name : Image_16032023163655730.png
|
2023-03-16 16:36:55.830255 |
96 |
56780247 |
CONSTRUCTION OF CONCRETE ROAD FROM DHARAM TALA TO SANATAN HAZRA BARI AT INDUS III |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM DHARAM TALA TO SANATAN HAZRA BARI AT INDUS III1 |
Completion of work |
-
latitude : 23.7941367,23.7941367
Longitude : 87.8323556,87.8323556
file name : Image_16032023164823983.png
|
2023-03-16 16:48:24.057858 |
97 |
56894629 |
CONSTRUCTION OF CONCRETE ROAD FROM SISIR HAZRA BARI TO ASHOKE HAZRA BARI AT INDUS BHARATPUR V |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM SISIR HAZRA BARI TO ASHOKE HAZRA BARI AT INDUS BHARATPUR V1 |
Completion of work |
-
latitude : 23.7941341,23.7941341
Longitude : 87.8323582,87.8323582
file name : Image_17032023164221555.png
|
2023-03-17 16:42:21.649577 |
98 |
57125873 |
CONSTRUCTION OF CONCRETE ROAD FROM MUNDUMALINI TALA GATE TO MUNDUMALIN TALA AT MAHESHPUR |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM MUNDUMALINI TALA GATE TO MUNDUMALIN TALA AT MAHESHPUR1 |
Completion of work |
-
latitude : 23.7940617,23.7940617
Longitude : 87.8324209,87.8324209
file name : Image_17032023164428949.png
|
2023-03-17 16:44:29.028919 |
99 |
57126388 |
CONSTRUCTION OF CONCRETE ROAD FROM KARTIK SARDAR BARI TO SHIBDAS BARI VIA BALAI SADAR BARI AT DWARON |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM KARTIK SARDAR BARI TO SHIBDAS BARI VIA BALAI SADAR BARI AT DWARON1 |
Completion of work |
-
latitude : 23.7940371,23.7940371
Longitude : 87.8324284,87.8324284
file name : Image_17032023165457438.png
|
2023-03-17 16:54:57.515505 |
100 |
34827722 |
CONSTRUCTION OF CONCRETE DRAIN FROM NARAYAN TALA TOWARDS SHIBJALHAR PUKUR AT KOTAL GHOSA |
150000 |
CONSTRUCTION OF CONCRETE DRAIN FROM NARAYAN TALA TOWARDS SHIBJALHAR PUKUR AT KOTAL GHOSA1 |
Plinth level |
-
latitude : 23.784001073800027,23.784001073800027
Longitude : 87.86018427461386,87.86018427461386
file name : Image_20032022103538172.png
|
2022-03-20 10:35:38.251166 |
101 |
34870352 |
CONSTRUCTION OF CC DRAIN FROM CHATRA BAYEN PUKUR TOWARDS DINUBANDHU ROY HOUSE AT CHATRA |
150000 |
CONSTRUCTION OF CC DRAIN FROM CHATRA BAYEN PUKUR TOWARDS DINUBANDHU ROY HOUSE AT CHATRA1 |
Plinth level |
-
latitude : 23.774292818270624,23.774292818270624
Longitude : 87.81687581911683,87.81687581911683
file name : Image_03022022111015760.png
|
2022-02-03 11:10:15.830562 |
102 |
34877370 |
CONSTRUCTION OF CC DRAIN FROM KALYANI SOREN BARI TOWARDS MIRU HEMBRAM BARI AT MAHESHPUR |
150000 |
CONSTRUCTION OF CC DRAIN FROM KALYANI SOREN BARI TOWARDS MIRU HEMBRAM BARI AT MAHESHPUR1 |
Plinth level |
-
latitude : 23.776042792014778,23.776042792014778
Longitude : 87.83197657205164,87.83197657205164
file name : Image_18012022115831570.png
|
2022-01-18 11:58:31.663475 |
103 |
34868956 |
CONSTRUCTION OF CONCRETE DRAIN FROM SUNIL TUDU HOUSE TOWARDS SOME TUDU HOUSE AT NOWAPARA |
125000 |
CONSTRUCTION OF CONCRETE DRAIN FROM SUNIL TUDU HOUSE TOWARDS SOME TUDU HOUSE AT NOWAPARA1 |
Plinth level |
-
latitude : 23.788986294530332,23.788986294530332
Longitude : 87.83395327627659,87.83395327627659
file name : Image_03062021111603751.png
|
2021-06-03 11:16:03.861271 |
104 |
56779173 |
CONSTRUCTION OF CONCRETE ROAD FROM BADAL METE BARI TO SWADHIN GHOSH BARI AT DONAIPUR |
110000 |
CONSTRUCTION OF CONCRETE ROAD FROM BADAL METE BARI TO SWADHIN GHOSH BARI AT DONAIPUR 1 |
Completion of work |
-
latitude : 23.7940733,23.7940733
Longitude : 87.8324193,87.8324193
file name : Image_22032023161215412.png
|
2023-03-22 16:12:15.500063 |
105 |
34916369 |
SOLAR LIGHT FIVE SANSAD |
225000 |
SOLAR LIGHT FIVE SANSAD1 |
Plinth level |
-
latitude : 23.801761488430202
Longitude : 87.82345955260098
file name : Image_09112021163859087.png
|
2021-11-09 16:38:59.191587 |
106 |
34830743 |
CONSTRUCTION OF CONCRETE ROAD FROM DURGATALA TOWARDS SUBIR MONDAL HOUSE AT GOKULBATI |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM DURGATALA TOWARDS SUBIR MONDAL HOUSE AT GOKULBATI1 |
Plinth level |
-
latitude : 23.79396208561957,23.79396208561957
Longitude : 87.86464227363467,87.86464227363467
file name : Image_24062021143423777.png
|
2021-06-24 14:34:23.880235 |
107 |
34812292 |
CONSTRUCTION OF CONCRETE DRAIN FROM BIPADTARAN DAS HOUSE TOWARDSNABA CANAL DHAR AT INDUS V |
100000 |
CONSTRUCTION OF CONCRETE DRAIN FROM BIPADTARAN DAS HOUSE TOWARDSNABA CANAL DHAR AT INDUS V1 |
Plinth level |
-
latitude : 23.6640213,23.6640213
Longitude : 87.7008427,87.7008427
file name : Image_22112021131506957.png
|
2021-11-22 13:15:07.070644 |
108 |
34867480 |
CONSTRUCTION OF CONCRETE DRAIN FROM PARESHNATH SAMANTA HOUSE TOWARDS BARNO BAGDI HOUSE AT LOHADDA |
150000 |
CONSTRUCTION OF CONCRETE DRAIN FROM PARESHNATH SAMANTA HOUSE TOWARDS BARNO BAGDI HOUSE AT LOHADDA1 |
Plinth level |
-
latitude : 23.795390194281936,23.795390194281936
Longitude : 87.83154113218188,87.83154113218188
file name : Image_03062021111557501.png
|
2021-06-03 11:15:57.605961 |
109 |
34735456 |
CONSTRUCTION OF CONCRETE DRAIN FROM MANIK DAS HOUSE TOWARDS DEBU DAS BARI AT DONAIPUR |
150000 |
CONSTRUCTION OF CONCRETE DRAIN FROM MANIK DAS HOUSE TOWARDS DEBU DAS BARI AT DONAIPUR1 |
Plinth level |
-
latitude : 23.801347464323044,23.801347464323044
Longitude : 87.81887046061456,87.81887046061456
file name : Image_07062021135007261.png
|
2021-06-07 13:50:07.158571 |
110 |
39064231 |
CONS CC DRAIN SUNIL MONDAL HOUSE TO KARTICK PAL BAGAN WITH COVER INDUS III |
200000 |
CONS CC DRAIN SUNIL MONDAL HOUSE TO KARTICK PAL BAGAN WITH COVER INDUS III1 |
Plinth level |
-
latitude : 23.765611010603607,23.765611010603607
Longitude : 87.80427471734583,87.80427471734583
file name : Image_08112021120028825.png
|
2021-11-08 12:00:28.930745 |
111 |
57132996 |
CONSTRUCTION OF CONCRETE ROAD FROM JOY MONDAL BARI TO SUKUMAR BHATTACHARYA BARI AT KOTAL GHOSA |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM JOY MONDAL BARI TO SUKUMAR BHATTACHARYA BARI AT KOTAL GHOSA1 |
Completion of work |
-
latitude : 23.7940323,23.7940323
Longitude : 87.8324364,87.8324364
file name : Image_30032023155145314.png
|
2023-03-30 15:51:45.388894 |
112 |
56896051 |
CONSTRUCTION OF CONCRETE ROAD FROM BISHNU MONDAL BARI TO PAL PUKUR DHAR AT KADWA |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM BISHNU MONDAL BARI TO PAL PUKUR DHAR AT KADWA 1 |
Completion of work |
-
latitude : 23.7940423,23.7940145
Longitude : 87.8324378,87.8324517
file name : Image_30032023155342596.png
|
2023-03-30 15:53:42.69526 |
113 |
57130535 |
CONSTRUCTION OF CONCRETE ROAD FROM KARUNA SINDHU KARMAR BARI TO DINABANDHU KARMAKAR BARI AT SURULIA |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM KARUNA SINDHU KARMAR BARI TO DINABANDHU KARMAKAR BARI AT SURULIA1 |
Completion of work |
-
latitude : 23.7940756,23.7940756
Longitude : 87.8324115,87.8324115
file name : Image_30032023155712718.png
|
2023-03-30 15:57:12.798954 |
114 |
58683861 |
CONSTRUCTION OF CONCRETE DRAIN FROM SATTAR JAMI TO KANDOOR DHAR AT DASKINDURGAPUR |
200000 |
CONSTRUCTION OF CONCRETE DRAIN FROM SATTAR JAMI TO KANDOOR DHAR AT DASKINDURGAPUR1 |
Completion of work |
-
latitude : 23.7900375,23.7900375
Longitude : 87.8337549,87.8337549
file name : Image_28042023162658830.png
|
2023-04-28 16:26:58.903523 |
115 |
47734333 |
CONSTRUCTION OF CC DRAIN FROM ABUL KASEM LAND TOWARDS NORTH SOUTH AT DASKINDURGAPUR |
150000 |
CONSTRUCTION OF CC DRAIN FROM ABUL KASEM LAND TOWARDS NORTH SOUTH AT DASKINDURGAPUR1 |
Completion of work |
-
latitude : 23.7900711,23.7900584
Longitude : 87.8337431,87.8337466
file name : Image_20042023144927524.png
|
2023-04-20 14:49:27.605652 |
116 |
57130126 |
CONSTRUCTION OF CONCRETE ROAD FROM PRATIMA BAGDI BARI TO ANGUR SK BARI AT DULA SAHAPUR |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM PRATIMA BAGDI BARI TO ANGUR SK BARI AT DULA SAHAPUR 1 |
Completion of work |
-
latitude : 23.7900183,23.7900183
Longitude : 87.8337444,87.8337444
file name : Image_10052023162051024.png
|
2023-05-10 16:20:51.105127 |
117 |
58483500 |
CONSTRUCTION OF CONCRETE DRAIN FROM BHUBAN MONDAL BARI TO TUFAN KONAR BARI AT KADWA |
100000 |
CONSTRUCTION OF CONCRETE DRAIN FROM BHUBAN MONDAL BARI TO TUFAN KONAR BARI AT KADWA1 |
Completion of work |
-
latitude : 23.7900275,23.7900275
Longitude : 87.833743,87.833743
file name : Image_19052023144041498.png
|
2023-05-19 14:40:41.694163 |
118 |
58685861 |
CONSTRUCTION OF CONCRETE DRAIN FROM ANAR SK BARI TO KANA NADI AT DULASAHAPUR |
100000 |
CONSTRUCTION OF CONCRETE DRAIN FROM ANAR SK BARI TO KANA NADI AT DULASAHAPUR1 |
Completion of work |
-
latitude : 23.7899826,23.7899826
Longitude : 87.8337546,87.8337546
file name : Image_12052023155813256.png
|
2023-05-12 15:58:13.427509 |
119 |
58484000 |
CONSTRUCTION OF CONCRETE DRAIN FROM TALBONA DANGA TO HORI PUKUR PAR AT KADWA |
100000 |
CONSTRUCTION OF CONCRETE DRAIN FROM TALBONA DANGA TO HORI PUKUR PAR AT KADWA1 |
Completion of work |
-
latitude : 23.7899839,23.7899839
Longitude : 87.8337599,87.8337599
file name : Image_22052023163543307.png
|
2023-05-22 16:35:43.381275 |
120 |
56780024 |
CONSTRUCTION OF CONCRETE ROAD FROM PURBA KADIPUR KURO PALER BARI TO RAKHAKAR PAL BARI AT PURBA KADIP |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM PURBA KADIPUR KURO PALER BARI TO RAKHAKAR PAL BARI AT PURBA KADIP1 |
Completion of work |
-
latitude : 23.7896166,23.7896166
Longitude : 87.833777,87.833777
file name : Image_14082023130715394.png
|
2023-08-14 13:07:15.486564 |
121 |
56780024 |
CONSTRUCTION OF CONCRETE ROAD FROM PURBA KADIPUR KURO PALER BARI TO RAKHAKAR PAL BARI AT PURBA KADIP |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM PURBA KADIPUR KURO PALER BARI TO RAKHAKAR PAL BARI AT PURBA KADIP1 |
Completion of work |
-
latitude : 23.7896125,23.7896125
Longitude : 87.8337525,87.8337525
file name : Image_02062023160738996.png
|
2023-06-02 16:07:39.066799 |
122 |
56897892 |
CONSTRUCTION OF CONCRETE ROAD FROM KALI MANDIR TO MOROL PUKUR AT MAHESHPUR |
50000 |
CONSTRUCTION OF CONCRETE ROAD FROM KALI MANDIR TO MOROL PUKUR AT MAHESHPUR 1 |
Completion of work |
-
latitude : 23.7896176,23.7896176
Longitude : 87.8337841,87.8337841
file name : Image_14082023131423324.png
|
2023-08-14 13:14:23.397212 |
123 |
57129355 |
CONSTRUCTION OF CONCRETE ROAD FROM ADIBASIPARA SUMITRA HEMBRAM BARI TO BISHU HASDA BARI AT PURBA NOW |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM ADIBASIPARA SUMITRA HEMBRAM BARI TO BISHU HASDA BARI AT PURBA NOW1 |
Completion of work |
-
latitude : 23.789616,23.789616
Longitude : 87.8337781,87.8337781
file name : Image_14082023130905569.png
|
2023-08-14 13:09:05.638873 |
124 |
58136554 |
CONSTRUCTION OF CONCRETE DRAIN FROM NARAYAN MONDAL BARI TO ANANTA SAHA BARI AT PURBA KADIPUR |
75000 |
CONSTRUCTION OF CONCRETE DRAIN FROM NARAYAN MONDAL BARI TO ANANTA SAHA BARI AT PURBA KADIPUR1 |
Completion of work |
-
latitude : 23.7896213,23.7896213
Longitude : 87.8337847,87.8337847
file name : Image_14082023133105290.png
|
2023-08-14 13:31:05.367229 |
125 |
47677153 |
CONSTRUCTION OF CONCRETE DRAIN FROM MAIN ROAD TOWARDS ASTOM ROY KHAMAR AT PURBAKADIPUR |
100000 |
CONSTRUCTION OF CONCRETE DRAIN FROM MAIN ROAD TOWARDS ASTOM ROY KHAMAR AT PURBAKADIPUR1 |
Completion of work |
-
latitude : 23.7896486,23.7896486
Longitude : 87.8337915,87.8337915
file name : Image_14082023132835040.png
|
2023-08-14 13:28:35.114471 |
126 |
58482007 |
CONSTRUCTION OF CONCRETE DRAIN FROM GOUR DAS BARI TO BABAN KAIBARTYA BARI AT INDUS PASCHIM IV |
75000 |
CONSTRUCTION OF CONCRETE DRAIN FROM GOUR DAS BARI TO BABAN KAIBARTYA BARI AT INDUS PASCHIM IV1 |
Completion of work |
-
latitude : 23.7897727,23.7897727
Longitude : 87.8338049,87.8338049
file name : Image_21092023141003474.png
|
2023-09-21 14:10:03.546191 |
127 |
56780513 |
CONSTRUCTION OF CONCRETE ROAD FROM BABAN DAS BARI TO MANU DAS BARI AT INDUS IV |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM BABAN DAS BARI TO MANU DAS BARI AT INDUS IV1 |
Completion of work |
-
latitude : 23.7897707,23.7897707
Longitude : 87.8338047,87.8338047
file name : Image_21092023142453375.png
|
2023-09-21 14:24:53.443877 |
128 |
58681755 |
CONSTRUCTION OF CONCRETE DRAIN FROM SANDIP BANERJEE BARI TO DURGA MANDIR AT RADHAKRISHNAPUR |
75000 |
CONSTRUCTION OF CONCRETE DRAIN FROM SANDIP BANERJEE BARI TO DURGA MANDIR AT RADHAKRISHNAPUR 1 |
Completion of work |
-
latitude : 23.7897705,23.7897705
Longitude : 87.8338046,87.8338046
file name : Image_21092023143408141.png
|
2023-09-21 14:34:08.256572 |
129 |
58699680 |
TUBE WEL SINKING RE SINKING AND MAINTAINANCE |
1398565 |
TUBE WEL SINKING RE SINKING AND MAINTAINANCE1 |
Completion of work |
-
latitude : 23.7899576
Longitude : 87.8338073
file name : Image_29122023142447181.png
|
2023-12-29 14:24:47.255166 |
130 |
58481419 |
CONSTRUCTION OF CONCRETE DRAIN FROM NITU HOSH BARI TO ANATH GHOSH BARI AT INDUS PASCHIM IV |
75000 |
CONSTRUCTION OF CONCRETE DRAIN FROM NITU HOSH BARI TO ANATH GHOSH BARI AT INDUS PASCHIM IV1 |
Completion of work |
-
latitude : 23.789797,23.789797
Longitude : 87.8338025,87.8338025
file name : Image_07112023160442085.png
|
2023-11-07 16:04:42.351735 |
131 |
58480873 |
CONSTRUCTION OF CONCRETE DRAIN FROM AJAY SARKAR BARI TO BIPRA SADHU BARI AT INDUS PURBA III |
150000 |
CONSTRUCTION OF CONCRETE DRAIN FROM AJAY SARKAR BARI TO BIPRA SADHU BARI AT INDUS PURBA III1 |
Completion of work |
-
latitude : 23.7897732,23.7897732
Longitude : 87.8338166,87.8338166
file name : Image_10112023140218874.png
|
2023-11-10 14:02:19.012655 |
132 |
68455030 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.7899628
Longitude : 87.8337959
file name : Image_03012024150159090.png
|
2024-01-03 15:01:59.159594 |
133 |
68278411 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.7900081,23.7900081
Longitude : 87.8337624,87.8337624
file name : Image_28022024155739767.png
|
2024-02-28 15:57:39.83464 |
134 |
68278411 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.7900043,23.7900043
Longitude : 87.8337639,87.8337639
file name : Image_28022024154647350.png
|
2024-02-28 15:46:47.430843 |
135 |
68278411 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.7900018,23.7900018
Longitude : 87.8337788,87.8337788
file name : Image_28022024153739380.png
|
2024-02-28 15:37:39.448824 |
136 |
68278512 |
Construction of roads |
75000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.7899125,23.7899125
Longitude : 87.8338426,87.8338426
file name : Image_18012024163457986.png
|
2024-01-18 16:34:58.068199 |
137 |
68454795 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.7900078
Longitude : 87.8337513
file name : Image_22012024154316416.png
|
2024-01-22 15:43:16.483167 |
138 |
68278340 |
Construction of roads |
235000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.78998,23.78998
Longitude : 87.8337755,87.8337755
file name : Image_24012024152008432.png
|
2024-01-24 15:20:08.505626 |
139 |
68265419 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.7899797,23.7899797
Longitude : 87.8337701,87.8337701
file name : Image_24012024154559097.png
|
2024-01-24 15:45:59.157998 |
140 |
68455373 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.7899637
Longitude : 87.8337313
file name : Image_05032024152516612.png
|
2024-03-05 15:25:16.69264 |
141 |
68455373 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.7899453
Longitude : 87.8337216
file name : Image_05032024151604151.png
|
2024-03-05 15:16:04.231306 |
142 |
68455373 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.7899802
Longitude : 87.833749
file name : Image_05032024151358604.png
|
2024-03-05 15:13:58.676397 |
143 |
58684425 |
CONSTRUCTION OF CONCRETE DRAIN FROM RAGHUNATH SAMANTA BARI TO BARNA BAGDI BARI AT LOHADDA |
125000 |
CONSTRUCTION OF CONCRETE DRAIN FROM RAGHUNATH SAMANTA BARI TO BARNA BAGDI BARI AT LOHADDA1 |
Completion of work |
-
latitude : 23.7897729,23.7897729
Longitude : 87.833804,87.833804
file name : Image_22112023131908648.png
|
2023-11-22 13:19:08.720171 |
144 |
68278650 |
Construction of roads |
125000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.7899633,23.7899633
Longitude : 87.833744,87.833744
file name : Image_05022024152402512.png
|
2024-02-05 15:24:02.593058 |
145 |
47681817 |
CONSTRUCTION OF CCDRAIN FROM JAGANNATH ROY LAND TOWARDS SASTI MONDAL LAND AT CHATRA |
75000 |
CONSTRUCTION OF CCDRAIN FROM JAGANNATH ROY LAND TOWARDS SASTI MONDAL LAND AT CHATRA1 |
Completion of work |
-
latitude : 23.7899858,23.7899858
Longitude : 87.8337393,87.8337393
file name : Image_05022024153532617.png
|
2024-02-05 15:35:32.892706 |
146 |
57132038 |
CONSTRUCTION OF CONCRETE ROAD FROM CHATURA MONDAL BARI TO MANIK MONDAL BARI AT GOKULBATI |
50000 |
CONSTRUCTION OF CONCRETE ROAD FROM CHATURA MONDAL BARI TO MANIK MONDAL BARI AT GOKULBATI1 |
Completion of work |
-
latitude : 23.7899833,23.7899833
Longitude : 87.833751,87.833751
file name : Image_09022024134228936.png
|
2024-02-09 13:42:29.028724 |
147 |
68265603 |
Construction of RAMS |
220000 |
Construction of bathing ghat at dharampukur kadipur22 |
Roof laid |
-
latitude : 23.7899687,23.7899687
Longitude : 87.8337657,87.8337657
file name : Image_10022024150801594.png
|
2024-02-10 15:08:01.659244 |
148 |
68265603 |
Construction of RAMS |
220000 |
Construction of bathing ghat at dharampukur kadipur22 |
Plinth level |
-
latitude : 23.789979,23.789979
Longitude : 87.8338003,87.8338003
file name : Image_10022024145333088.png
|
2024-02-10 14:53:33.162072 |
149 |
68265603 |
Construction of RAMS |
220000 |
Construction of bathing ghat at dharampukur kadipur22 |
Completion of work |
-
latitude : 23.7899755,23.7899755
Longitude : 87.8337962,87.8337962
file name : Image_09022024132931897.png
|
2024-02-09 13:29:31.978065 |
150 |
68452366 |
Drainage Construction |
250000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.7900043
Longitude : 87.8337624
file name : Image_28022024155551209.png
|
2024-02-28 15:55:51.285771 |
151 |
68452366 |
Drainage Construction |
250000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.7899997
Longitude : 87.8337865
file name : Image_28022024154508451.png
|
2024-02-28 15:45:08.540507 |
152 |
68452366 |
Drainage Construction |
250000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.7899651
Longitude : 87.8337931
file name : Image_28022024153454028.png
|
2024-02-28 15:34:54.106664 |
153 |
57137260 |
CONTRUCTION OF CONCRETE ROAD FROM VAKU MONDAL BARI TO PORESH THANDER BARI AT KOTALGHOSA |
75000 |
CONTRUCTION OF CONCRETE ROAD FROM VAKU MONDAL BARI TO PORESH THANDER BARI AT KOTALGHOSA1 |
Plinth level |
-
latitude : 23.7899805,23.7899805
Longitude : 87.8337525,87.8337525
file name : Image_05032024155852630.png
|
2024-03-05 15:58:52.77038 |
154 |
57137260 |
CONTRUCTION OF CONCRETE ROAD FROM VAKU MONDAL BARI TO PORESH THANDER BARI AT KOTALGHOSA |
75000 |
CONTRUCTION OF CONCRETE ROAD FROM VAKU MONDAL BARI TO PORESH THANDER BARI AT KOTALGHOSA1 |
Completion of work |
-
latitude : 23.7899657,23.7899657
Longitude : 87.8337521,87.8337521
file name : Image_05032024154926775.png
|
2024-03-05 15:49:26.85596 |
155 |
57137260 |
CONTRUCTION OF CONCRETE ROAD FROM VAKU MONDAL BARI TO PORESH THANDER BARI AT KOTALGHOSA |
75000 |
CONTRUCTION OF CONCRETE ROAD FROM VAKU MONDAL BARI TO PORESH THANDER BARI AT KOTALGHOSA1 |
Completion of work |
-
latitude : 23.7899886,23.7899886
Longitude : 87.8337509,87.8337509
file name : Image_05032024154743300.png
|
2024-03-05 15:47:43.374239 |
156 |
58482961 |
CONSTRUCTION OF CONCRETE DRAIN FROM PRABHAKAR BAGDI BARI TO HARANATH BAGDI BARI AT MILANPUR |
75000 |
CONSTRUCTION OF CONCRETE DRAIN FROM PRABHAKAR BAGDI BARI TO HARANATH BAGDI BARI AT MILANPUR1 |
Roof laid |
-
latitude : 23.7899648,23.7899648
Longitude : 87.8337302,87.8337302
file name : Image_11032024130447600.png
|
2024-03-11 13:04:47.667877 |
157 |
58482961 |
CONSTRUCTION OF CONCRETE DRAIN FROM PRABHAKAR BAGDI BARI TO HARANATH BAGDI BARI AT MILANPUR |
75000 |
CONSTRUCTION OF CONCRETE DRAIN FROM PRABHAKAR BAGDI BARI TO HARANATH BAGDI BARI AT MILANPUR1 |
Plinth level |
-
latitude : 23.7899955,23.7900113
Longitude : 87.8337607,87.8337479
file name : Image_11032024125811021.png
|
2024-03-11 12:58:11.085752 |
158 |
58482961 |
CONSTRUCTION OF CONCRETE DRAIN FROM PRABHAKAR BAGDI BARI TO HARANATH BAGDI BARI AT MILANPUR |
75000 |
CONSTRUCTION OF CONCRETE DRAIN FROM PRABHAKAR BAGDI BARI TO HARANATH BAGDI BARI AT MILANPUR1 |
Completion of work |
-
latitude : 23.7899701,23.7899701,23.7899701,23.7899701,23.7899701
Longitude : 87.8337327,87.8337327,87.8337327,87.8337327,87.8337327
file name : Image_11032024125001308.png
|
2024-03-11 12:50:01.378906 |
159 |
68279068 |
Construction of roads |
125000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.7900093,23.7900093
Longitude : 87.8337495,87.8337495
file name : Image_11032024123648641.png
|
2024-03-11 12:36:48.716798 |
160 |
68279068 |
Construction of roads |
125000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.7900068,23.7900068
Longitude : 87.8337491,87.8337491
file name : Image_11032024123305665.png
|
2024-03-11 12:33:05.750162 |
161 |
68279068 |
Construction of roads |
125000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.7899892,23.7899892
Longitude : 87.8337432,87.8337432
file name : Image_11032024122729274.png
|
2024-03-11 12:27:29.366461 |
162 |
68278937 |
Construction of roads |
50000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.7899836,23.7899836
Longitude : 87.8337347,87.8337347
file name : Image_21032024130236558.png
|
2024-03-21 13:02:36.637505 |
163 |
68278937 |
Construction of roads |
50000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.7899692,23.7899692
Longitude : 87.8337511,87.8337511
file name : Image_21032024125945609.png
|
2024-03-21 12:59:45.684961 |
164 |
68278937 |
Construction of roads |
50000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.789952,23.789952
Longitude : 87.8337326,87.8337326
file name : Image_21032024124637590.png
|
2024-03-21 12:46:37.681309 |
165 |
68278937 |
Construction of roads |
50000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.7899742,23.7899742
Longitude : 87.8337643,87.8337643
file name : Image_11032024124419445.png
|
2024-03-11 12:44:19.507163 |
166 |
68278786 |
Construction of roads |
125000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.7899698,23.7899698
Longitude : 87.8337358,87.8337358
file name : Image_12032024160438869.png
|
2024-03-12 16:04:38.935703 |
167 |
68278786 |
Construction of roads |
125000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.7899892,23.7899892
Longitude : 87.8337443,87.8337443
file name : Image_12032024160109365.png
|
2024-03-12 16:01:09.437834 |
168 |
68278786 |
Construction of roads |
125000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.7899718,23.7899718
Longitude : 87.8337303,87.8337303
file name : Image_12032024155751130.png
|
2024-03-12 15:57:51.202935 |
169 |
68452480 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.7899857
Longitude : 87.8337313
file name : Image_03042024141343868.png
|
2024-04-03 14:13:43.946179 |
170 |
68452480 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.7899671
Longitude : 87.8337615
file name : Image_03042024140923419.png
|
2024-04-03 14:09:23.500624 |
171 |
68452480 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.7899614
Longitude : 87.8337355
file name : Image_21032024125133413.png
|
2024-03-21 12:51:33.621964 |
172 |
68278127 |
Construction of RAMS |
220000 |
Construction of RAMS1 Bathing ghat |
Roof laid |
-
latitude : 23.7899572,23.7899572
Longitude : 87.8337321,87.8337321
file name : Image_27032024121155084.png
|
2024-03-27 12:11:55.188946 |
173 |
68278127 |
Construction of RAMS |
220000 |
Construction of RAMS1 Bathing ghat |
Plinth level |
-
latitude : 23.7899613,23.7899613
Longitude : 87.8337357,87.8337357
file name : Image_27032024120914419.png
|
2024-03-27 12:09:14.530121 |
174 |
68278127 |
Construction of RAMS |
220000 |
Construction of RAMS1 Bathing ghat |
Completion of work |
-
latitude : 23.7899556,23.7899556
Longitude : 87.8337312,87.8337312
file name : Image_27032024120705221.png
|
2024-03-27 12:07:05.384372 |
175 |
68278835 |
Construction of roads |
175000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.7899509,23.7899509
Longitude : 87.8337327,87.8337327
file name : Image_27032024122008532.png
|
2024-03-27 12:20:08.670881 |
176 |
68278835 |
Construction of roads |
175000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.7899532,23.7899532
Longitude : 87.833732,87.833732
file name : Image_27032024121824441.png
|
2024-03-27 12:18:24.541519 |
177 |
68278835 |
Construction of roads |
175000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.7899544,23.7899627
Longitude : 87.8337355,87.8337345
file name : Image_27032024121642247.png
|
2024-03-27 12:16:42.358289 |
178 |
68278835 |
Construction of roads |
175000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.7899792,23.7899792
Longitude : 87.8337375,87.8337375
file name : Image_21032024125302586.png
|
2024-03-21 12:53:02.665731 |
179 |
56895645 |
CONSTRUCTION OF CONCRETE ROAD FROM NIM GORE TO FOOTBALL MATH AT MILANPUR |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM NIM GORE TO FOOTBALL MATH AT MILANPUR 1 |
Plinth level |
-
latitude : 23.78998428583145,23.78998428583145
Longitude : 87.83371866680682,87.83371866680682
file name : Image_02072024185734947.png
|
2024-07-02 18:57:35.017385 |
180 |
56895645 |
CONSTRUCTION OF CONCRETE ROAD FROM NIM GORE TO FOOTBALL MATH AT MILANPUR |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM NIM GORE TO FOOTBALL MATH AT MILANPUR 1 |
Completion of work |
-
latitude : 23.789999415166676,23.789999415166676
Longitude : 87.8337765019387,87.8337765019387
file name : Image_02072024181751289.png
|
2024-07-02 18:17:51.366468 |
181 |
68338815 |
Installation of Tubewell |
1000000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.7899386
Longitude : 87.8337066
file name : Image_08072024155125245.png
|
2024-07-08 15:51:25.340395 |
182 |
57630086 |
INSTALLATION OF SOLAR OFF GRID SYSTEM IN GP OFFICE |
490000 |
INSTALLATION OF SOLAR OFF GRID SYSTEM IN GP OFFICE1 |
Roof laid |
-
latitude : 23.7899537
Longitude : 87.833711
file name : Image_06072024143652170.png
|
2024-07-06 14:36:52.235292 |
183 |
57630086 |
INSTALLATION OF SOLAR OFF GRID SYSTEM IN GP OFFICE |
490000 |
INSTALLATION OF SOLAR OFF GRID SYSTEM IN GP OFFICE1 |
Plinth level |
-
latitude : 23.7899259
Longitude : 87.8337065
file name : Image_06072024142542402.png
|
2024-07-06 14:25:42.467519 |
184 |
57630086 |
INSTALLATION OF SOLAR OFF GRID SYSTEM IN GP OFFICE |
490000 |
INSTALLATION OF SOLAR OFF GRID SYSTEM IN GP OFFICE1 |
Completion of work |
-
latitude : 23.7899287
Longitude : 87.8337092
file name : Image_06072024141505452.png
|
2024-07-06 14:15:05.533063 |
185 |
107175403 |
Construction of roads |
50000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.7899172,23.7899172
Longitude : 87.8337023,87.8337023
file name : Image_01082024145507547.png
|
2024-08-01 14:55:07.645315 |
186 |
107175403 |
Construction of roads |
50000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.7899511,23.7899511
Longitude : 87.8337116,87.8337116
file name : Image_31072024154949906.png
|
2024-07-31 15:49:49.96866 |
187 |
107176243 |
Creation of drainage channel for management of grey water |
75000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.7899295
Longitude : 87.8337047
file name : Image_07082024142107551.png
|
2024-08-07 14:21:07.631261 |
188 |
107175520 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.7899397
Longitude : 87.8337019
file name : Image_12082024143319171.png
|
2024-08-12 14:33:19.233923 |
189 |
107175520 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.7899328
Longitude : 87.8336992
file name : Image_12082024142613029.png
|
2024-08-12 14:26:13.090541 |
190 |
107175520 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.7899201
Longitude : 87.8337013
file name : Image_12082024141841693.png
|
2024-08-12 14:18:41.756629 |
191 |
107175520 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.7899201
Longitude : 87.8337013
file name : Image_12082024141850794.png
|
2024-08-12 14:18:50.85631 |
192 |
107175468 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.7899142
Longitude : 87.8337036
file name : Image_12082024151526168.png
|
2024-08-12 15:15:26.242537 |
193 |
107175468 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.7899202
Longitude : 87.8337012
file name : Image_12082024150747881.png
|
2024-08-12 15:07:47.950631 |
194 |
107175468 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.7899416
Longitude : 87.8337008
file name : Image_12082024145331639.png
|
2024-08-12 14:53:31.705565 |
195 |
107176220 |
Creation of drainage channel for management of grey water |
125000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.7899164
Longitude : 87.833705
file name : Image_21082024141302491.png
|
2024-08-21 14:13:02.596723 |
196 |
107176220 |
Creation of drainage channel for management of grey water |
125000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.7899132
Longitude : 87.8337029
file name : Image_21082024135928192.png
|
2024-08-21 13:59:28.384334 |
197 |
107176220 |
Creation of drainage channel for management of grey water |
125000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.78991
Longitude : 87.833702
file name : Image_21082024131634930.png
|
2024-08-21 13:16:35.130032 |
198 |
98476626 |
Construction of roads |
125000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.7899389,23.7899389
Longitude : 87.8337098,87.8337098
file name : Image_21082024153855881.png
|
2024-08-21 15:38:56.005982 |
199 |
98476626 |
Construction of roads |
125000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.7899394,23.7899394
Longitude : 87.8337077,87.8337077
file name : Image_21082024153223096.png
|
2024-08-21 15:32:23.180045 |
200 |
98484896 |
Construction of roads |
175000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.7899272,23.7899272
Longitude : 87.8337312,87.8337312
file name : Image_14112024152910716.png
|
2024-11-14 15:29:10.826915 |
201 |
98484896 |
Construction of roads |
175000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.7899274,23.7899274
Longitude : 87.8337325,87.8337325
file name : Image_14112024152243288.png
|
2024-11-14 15:22:43.406267 |
202 |
98484896 |
Construction of roads |
175000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.790040486492217,23.7899212
Longitude : 87.83400993794203,87.8337281
file name : Image_14112024151543287.png
|
2024-11-14 15:15:43.45148 |
203 |
98778453 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.7899226
Longitude : 87.8337306
file name : Image_18112024141413256.png
|
2024-11-18 14:14:13.32166 |
204 |
98778453 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.7899368
Longitude : 87.8337352
file name : Image_18112024140843610.png
|
2024-11-18 14:08:43.679291 |
205 |
98778453 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.79020778927952
Longitude : 87.83360090106726
file name : Image_18112024140533252.png
|
2024-11-18 14:05:33.313456 |
206 |
98777128 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.7899528
Longitude : 87.8337537
file name : Image_13112024143658638.png
|
2024-11-13 14:36:57.711669 |
207 |
98777128 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.7899247
Longitude : 87.8337395
file name : Image_13112024143339966.png
|
2024-11-13 14:33:40.068828 |
208 |
98777128 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.7899331
Longitude : 87.83377
file name : Image_13112024142846303.png
|
2024-11-13 14:28:46.369023 |
209 |
98777374 |
Creation of drainage channel for management of grey water |
225637 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.7899591
Longitude : 87.8337424
file name : Image_20112024144341435.png
|
2024-11-20 14:43:41.49819 |
210 |
98777374 |
Creation of drainage channel for management of grey water |
225637 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.789948
Longitude : 87.8337484
file name : Image_20112024143833252.png
|
2024-11-20 14:38:33.35201 |
211 |
98777374 |
Creation of drainage channel for management of grey water |
225637 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.7899219
Longitude : 87.8337364
file name : Image_20112024143311452.png
|
2024-11-20 14:33:11.544354 |
212 |
98781706 |
Creation of a new source of drinking water |
351000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.78985197748989
Longitude : 87.83346377313137
file name : Image_22112024162854912.png
|
2024-11-22 16:28:54.988063 |
213 |
98781706 |
Creation of a new source of drinking water |
351000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.7899485
Longitude : 87.8337514
file name : Image_22112024162014168.png
|
2024-11-22 16:20:14.297227 |
214 |
98781706 |
Creation of a new source of drinking water |
351000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.7899639
Longitude : 87.8337377
file name : Image_22112024161030386.png
|
2024-11-22 16:10:30.509086 |