1 |
34731453 |
CONST OF WAITING ROOM SHED AT BUS STAND AT MULDHAPAR AT LOKEPARA CFCG THIRTY FOUR |
200000 |
CONST OF WAITING ROOM SHED AT BUS STAND AT MULDHAPAR AT LOKEPARA CFCG THIRTY FOUR1 |
Roof laid |
-
latitude : 23.933960000000003
Longitude : 87.83271500000001
file name : Image_17122020114914205.png
|
2020-12-17 11:49:14.272189 |
2 |
34731453 |
CONST OF WAITING ROOM SHED AT BUS STAND AT MULDHAPAR AT LOKEPARA CFCG THIRTY FOUR |
200000 |
CONST OF WAITING ROOM SHED AT BUS STAND AT MULDHAPAR AT LOKEPARA CFCG THIRTY FOUR1 |
Plinth level |
-
latitude : 23.933919999999997
Longitude : 87.83271333333332
file name : Image_14122020155158276.png
|
2020-12-14 15:51:58.354821 |
3 |
34731453 |
CONST OF WAITING ROOM SHED AT BUS STAND AT MULDHAPAR AT LOKEPARA CFCG THIRTY FOUR |
200000 |
CONST OF WAITING ROOM SHED AT BUS STAND AT MULDHAPAR AT LOKEPARA CFCG THIRTY FOUR1 |
Completion of work |
-
latitude : 23.933916666666665
Longitude : 87.83267
file name : Image_14122020135001839.png
|
2020-12-14 13:50:01.919241 |
4 |
34693371 |
CONST OF PCCC ROAD FROM SANTO DEY HOUSE TO SANNASI THAKURTALA AT BANDH CFCG TWO |
350000 |
CONST OF PCCC ROAD FROM SANTO DEY HOUSE TO SANNASI THAKURTALA AT BANDH CFCG TWO1 |
Roof laid |
-
latitude : 23.96225833333333,23.96225833333333,23.96226
Longitude : 87.823735,87.823735,87.82373166666666
file name : Image_15062021164000761.png
|
2021-06-15 16:40:00.850117 |
5 |
34693371 |
CONST OF PCCC ROAD FROM SANTO DEY HOUSE TO SANNASI THAKURTALA AT BANDH CFCG TWO |
350000 |
CONST OF PCCC ROAD FROM SANTO DEY HOUSE TO SANNASI THAKURTALA AT BANDH CFCG TWO1 |
Roof laid |
-
latitude : 23.962286666666667,23.962286666666667
Longitude : 87.82373333333335,87.82373333333335
file name : Image_15062021164004983.png
|
2021-06-15 16:40:05.066416 |
6 |
34693371 |
CONST OF PCCC ROAD FROM SANTO DEY HOUSE TO SANNASI THAKURTALA AT BANDH CFCG TWO |
350000 |
CONST OF PCCC ROAD FROM SANTO DEY HOUSE TO SANNASI THAKURTALA AT BANDH CFCG TWO1 |
Roof laid |
-
latitude : 23.962286666666667,23.962286666666667
Longitude : 87.82373333333335,87.82373333333335
file name : Image_15062021164124932.png
|
2021-06-15 16:41:25.016852 |
7 |
34698560 |
CONST OF PCC ROAD FROM SADHAN DALUI HOUSE TO PACCA ROAD AT CHUATOR CFCG TWELVE |
100000 |
CONST OF PCC ROAD FROM SADHAN DALUI HOUSE TO PACCA ROAD AT CHUATOR CFCG TWELVE1 |
Roof laid |
-
latitude : 23.931433333333334,23.931433333333334
Longitude : 87.80044000000001,87.80044000000001
file name : Image_15122020143712291.png
|
2020-12-15 14:37:12.385997 |
8 |
34698560 |
CONST OF PCC ROAD FROM SADHAN DALUI HOUSE TO PACCA ROAD AT CHUATOR CFCG TWELVE |
100000 |
CONST OF PCC ROAD FROM SADHAN DALUI HOUSE TO PACCA ROAD AT CHUATOR CFCG TWELVE1 |
Plinth level |
-
latitude : 23.931435000000004,23.931438333333336
Longitude : 87.80043833333333,87.80043666666667
file name : Image_15122020142319439.png
|
2020-12-15 14:23:19.531096 |
9 |
34792300 |
CONST OF PCC ROAD FROM BANDHRANIPUR SASTI TALA TO BANDHRANIPUR SSK AT GHUSKARA CFCG SEVENTEEN |
150000 |
CONST OF PCC ROAD FROM BANDHRANIPUR SASTI TALA TO BANDHRANIPUR SSK AT GHUSKARA CFCG SEVENTEEN1 |
Plinth level |
-
latitude : 23.945775000000005,23.945771666666662,23.94577333333333
Longitude : 87.85157166666667,87.85157,87.85157
file name : Image_17122020132544700.png
|
2020-12-17 13:25:44.760902 |
10 |
34792300 |
CONST OF PCC ROAD FROM BANDHRANIPUR SASTI TALA TO BANDHRANIPUR SSK AT GHUSKARA CFCG SEVENTEEN |
150000 |
CONST OF PCC ROAD FROM BANDHRANIPUR SASTI TALA TO BANDHRANIPUR SSK AT GHUSKARA CFCG SEVENTEEN1 |
Roof laid |
-
latitude : 23.945761666666666,23.945763333333336,23.945763333333336
Longitude : 87.85162666666665,87.85162999999999,87.85162999999999
file name : Image_17122020132705800.png
|
2020-12-17 13:27:05.86321 |
11 |
34792300 |
CONST OF PCC ROAD FROM BANDHRANIPUR SASTI TALA TO BANDHRANIPUR SSK AT GHUSKARA CFCG SEVENTEEN |
150000 |
CONST OF PCC ROAD FROM BANDHRANIPUR SASTI TALA TO BANDHRANIPUR SSK AT GHUSKARA CFCG SEVENTEEN1 |
Plinth level |
-
latitude : 23.94578,23.94578
Longitude : 87.85160833333333,87.85160833333333
file name : Image_17122020132134969.png
|
2020-12-17 13:21:35.034569 |
12 |
39091454 |
CONST OF N PCC DN INC S PIT AND CO NEAR M MONDAL H TO KANDAR AT BELARA TIED ONE NINE |
145521 |
CONST OF N PCC DN INC S PIT AND CO NEAR M MONDAL H TO KANDAR AT BELARA TIED ONE NINE1 |
Completion of work |
-
latitude : 23.922558333333335,23.922558333333335,23.92254666666667
Longitude : 87.84405833333334,87.84405833333334,87.84407333333333
file name : Image_04022021142637063.png
|
2021-02-04 14:26:37.129568 |
13 |
39091454 |
CONST OF N PCC DN INC S PIT AND CO NEAR M MONDAL H TO KANDAR AT BELARA TIED ONE NINE |
145521 |
CONST OF N PCC DN INC S PIT AND CO NEAR M MONDAL H TO KANDAR AT BELARA TIED ONE NINE1 |
Completion of work |
-
latitude : 23.92248833333333,23.92248833333333
Longitude : 87.84405166666666,87.84405166666666
file name : Image_04022021142731687.png
|
2021-02-04 14:27:31.749919 |
14 |
39091454 |
CONST OF N PCC DN INC S PIT AND CO NEAR M MONDAL H TO KANDAR AT BELARA TIED ONE NINE |
145521 |
CONST OF N PCC DN INC S PIT AND CO NEAR M MONDAL H TO KANDAR AT BELARA TIED ONE NINE1 |
Completion of work |
-
latitude : 23.922653333333333,23.922653333333333
Longitude : 87.84402,87.84402
file name : Image_28012021111939028.png
|
2021-01-28 11:19:39.088591 |
15 |
39091454 |
CONST OF N PCC DN INC S PIT AND CO NEAR M MONDAL H TO KANDAR AT BELARA TIED ONE NINE |
145521 |
CONST OF N PCC DN INC S PIT AND CO NEAR M MONDAL H TO KANDAR AT BELARA TIED ONE NINE1 |
Completion of work |
-
latitude : 23.92262333333333,23.92262
Longitude : 87.84401833333335,87.84401833333335
file name : Image_28012021113644740.png
|
2021-01-28 11:36:44.807226 |
16 |
39091454 |
CONST OF N PCC DN INC S PIT AND CO NEAR M MONDAL H TO KANDAR AT BELARA TIED ONE NINE |
145521 |
CONST OF N PCC DN INC S PIT AND CO NEAR M MONDAL H TO KANDAR AT BELARA TIED ONE NINE1 |
Completion of work |
-
latitude : 23.92259,23.922586666666668
Longitude : 87.84407000000002,87.84407333333333
file name : Image_27012021110734544.png
|
2021-01-27 11:07:34.604316 |
17 |
39091454 |
CONST OF N PCC DN INC S PIT AND CO NEAR M MONDAL H TO KANDAR AT BELARA TIED ONE NINE |
145521 |
CONST OF N PCC DN INC S PIT AND CO NEAR M MONDAL H TO KANDAR AT BELARA TIED ONE NINE1 |
Completion of work |
-
latitude : 23.922598333333333,23.922598333333333
Longitude : 87.844055,87.844055
file name : Image_27012021110821550.png
|
2021-01-27 11:08:21.605372 |
18 |
39091336 |
NEW S DHARA SUB PUMP INC S PIT AND P FORM NEAR BAUL TALA AT MARJYATPUT TIED FIFTEEN |
200000 |
NEW S DHARA SUB PUMP INC S PIT AND P FORM NEAR BAUL TALA AT MARJYATPUT TIED FIFTEEN1 |
Completion of work |
-
latitude : 23.919251666666664
Longitude : 87.84856166666665
file name : Image_15062021095932238.png
|
2021-06-15 09:59:32.320184 |
19 |
39091336 |
NEW S DHARA SUB PUMP INC S PIT AND P FORM NEAR BAUL TALA AT MARJYATPUT TIED FIFTEEN |
200000 |
NEW S DHARA SUB PUMP INC S PIT AND P FORM NEAR BAUL TALA AT MARJYATPUT TIED FIFTEEN1 |
Completion of work |
-
latitude : 23.91925
Longitude : 87.84855666666665
file name : Image_13042021091714696.png
|
2021-04-13 09:17:14.780813 |
20 |
39091336 |
NEW S DHARA SUB PUMP INC S PIT AND P FORM NEAR BAUL TALA AT MARJYATPUT TIED FIFTEEN |
200000 |
NEW S DHARA SUB PUMP INC S PIT AND P FORM NEAR BAUL TALA AT MARJYATPUT TIED FIFTEEN1 |
Completion of work |
-
latitude : 23.919278333333335
Longitude : 87.84853333333334
file name : Image_13042021091814843.png
|
2021-04-13 09:18:14.904397 |
21 |
39091397 |
NEW S DHARA SUB PUMP NEAR ASIT MANDAL H AT GHUSKRA TIED ONE SEVEN |
200000 |
NEW S DHARA SUB PUMP NEAR ASIT MANDAL H AT GHUSKRA TIED ONE SEVEN1 |
Completion of work |
-
latitude : 23.945310000000003
Longitude : 87.85156833333333
file name : Image_28012021120229937.png
|
2021-01-28 12:02:29.983475 |
22 |
39091397 |
NEW S DHARA SUB PUMP NEAR ASIT MANDAL H AT GHUSKRA TIED ONE SEVEN |
200000 |
NEW S DHARA SUB PUMP NEAR ASIT MANDAL H AT GHUSKRA TIED ONE SEVEN1 |
Completion of work |
-
latitude : 23.945271666666667
Longitude : 87.85162166666666
file name : Image_28012021120233655.png
|
2021-01-28 12:02:33.701318 |
23 |
39091397 |
NEW S DHARA SUB PUMP NEAR ASIT MANDAL H AT GHUSKRA TIED ONE SEVEN |
200000 |
NEW S DHARA SUB PUMP NEAR ASIT MANDAL H AT GHUSKRA TIED ONE SEVEN1 |
Completion of work |
-
latitude : 23.945271666666667
Longitude : 87.85162166666666
file name : Image_28012021120241001.png
|
2021-01-28 12:02:41.050226 |
24 |
34741825 |
CONST OF PCC ROAD FROM ICDS CENTRE ADIBASI PARA TO DHIREN HEMRAM HOUSE CFCG TORTY ONE |
150000 |
CONST OF PCC ROAD FROM ICDS CENTRE ADIBASI PARA TO DHIREN HEMRAM HOUSE CFCG TORTY ONE1 |
Completion of work |
-
latitude : 23.934023333333336,23.934025,23.934025
Longitude : 87.81344666666668,87.81344499999999,87.81344499999999
file name : Image_13072021162009684.png
|
2021-07-13 16:20:09.74736 |
25 |
34708130 |
CONST OF PCC ROAD RAKHAHARI DAS HOUSE TO MADHAB DAS HOUSE AT KULIARA CFCG TWO FIVE |
150000 |
CONST OF PCC ROAD RAKHAHARI DAS HOUSE TO MADHAB DAS HOUSE AT KULIARA CFCG TWO FIVE1 |
Completion of work |
-
latitude : 23.930316666666666,23.930316666666666,23.930316666666666
Longitude : 87.83501833333334,87.83501833333334,87.83501833333334
file name : Image_23072021125612274.png
|
2021-07-23 12:56:12.353892 |
26 |
34708130 |
CONST OF PCC ROAD RAKHAHARI DAS HOUSE TO MADHAB DAS HOUSE AT KULIARA CFCG TWO FIVE |
150000 |
CONST OF PCC ROAD RAKHAHARI DAS HOUSE TO MADHAB DAS HOUSE AT KULIARA CFCG TWO FIVE1 |
Completion of work |
-
latitude : 23.930326666666662,23.930326666666662,23.93032
Longitude : 87.83502166666668,87.83502166666668,87.83502500000002
file name : Image_23072021125657008.png
|
2021-07-23 12:56:57.104982 |
27 |
34698894 |
CONST OF PCC ROAD FROM BALARAM MONDAL HOUSE TO GOURGOPAL MONDAL HOUSE AT DHEKA CFCG THIRTEEN |
125521 |
CONST OF PCC ROAD FROM BALARAM MONDAL HOUSE TO GOURGOPAL MONDAL HOUSE AT DHEKA CFCG THIRTEEN1 |
Completion of work |
-
latitude : 23.928316666666667,23.928316666666667,23.928316666666667
Longitude : 87.82730500000001,87.82730500000001,87.82730500000001
file name : Image_08092021083502451.png
|
2021-09-08 08:35:02.537056 |
28 |
34698894 |
CONST OF PCC ROAD FROM BALARAM MONDAL HOUSE TO GOURGOPAL MONDAL HOUSE AT DHEKA CFCG THIRTEEN |
125521 |
CONST OF PCC ROAD FROM BALARAM MONDAL HOUSE TO GOURGOPAL MONDAL HOUSE AT DHEKA CFCG THIRTEEN1 |
Completion of work |
-
latitude : 23.928316666666667,23.928316666666667,23.928316666666667,23.928316666666667
Longitude : 87.82730500000001,87.82730500000001,87.82730500000001,87.82730500000001
file name : Image_08092021083552805.png
|
2021-09-08 08:35:52.882374 |
29 |
34735980 |
CONST OF PCC ROAD FROM UMAPADA DAS LAND TO NABAKUMAR DAS LAND AT MARJATPUR CFCG THIRTY SEVEN |
150000 |
CONST OF PCC ROAD FROM UMAPADA DAS LAND TO NABAKUMAR DAS LAND AT MARJATPUR CFCG THIRTY SEVEN1 |
Completion of work |
-
latitude : 23.919233333333334,23.91924,23.91924,23.91925,23.91925,23.91925,23.91925
Longitude : 87.84870000000001,87.84870000000001,87.84870000000001,87.84870666666666,87.84870666666666,87.84870666666666,87.84870666666666
file name : Image_28112021112759227.png
|
2021-11-28 11:27:59.315781 |
30 |
34735980 |
CONST OF PCC ROAD FROM UMAPADA DAS LAND TO NABAKUMAR DAS LAND AT MARJATPUR CFCG THIRTY SEVEN |
150000 |
CONST OF PCC ROAD FROM UMAPADA DAS LAND TO NABAKUMAR DAS LAND AT MARJATPUR CFCG THIRTY SEVEN1 |
Completion of work |
-
latitude : 23.919263333333333,23.919263333333333,23.919263333333333
Longitude : 87.848715,87.848715,87.848715
file name : Image_28112021112938530.png
|
2021-11-28 11:29:38.599963 |
31 |
34722499 |
CONST OF PCC ROAD FROM ARUN DALUI HOUSE TO FATIK DALUI HOUSE CFCG THIRTY |
100000 |
CONST OF PCC ROAD FROM ARUN DALUI HOUSE TO FATIK DALUI HOUSE CFCG THIRTY1 |
Completion of work |
-
latitude : 23.929058333333334,23.929058333333334,23.929058333333334
Longitude : 87.82958166666667,87.82958166666667,87.82958166666667
file name : Image_13082021122526044.png
|
2021-08-13 12:25:26.18608 |
32 |
34706194 |
CONST OF PCC ROAD FROM SATINATH BANERJEE HOUSE TO RABI BAGDI HOUSE CFCG TWO THREE |
150000 |
CONST OF PCC ROAD FROM SATINATH BANERJEE HOUSE TO RABI BAGDI HOUSE CFCG TWO THREE1 |
Completion of work |
-
latitude : 23.92512166666667,23.925110000000004,23.92505833333333
Longitude : 87.83053,87.83053166666666,87.83051500000002
file name : Image_16072021124035201.png
|
2021-07-16 12:40:35.288726 |
33 |
34706194 |
CONST OF PCC ROAD FROM SATINATH BANERJEE HOUSE TO RABI BAGDI HOUSE CFCG TWO THREE |
150000 |
CONST OF PCC ROAD FROM SATINATH BANERJEE HOUSE TO RABI BAGDI HOUSE CFCG TWO THREE1 |
Completion of work |
-
latitude : 23.92505833333333,23.92505833333333,23.92505833333333
Longitude : 87.83051500000002,87.83051500000002,87.83051500000002
file name : Image_16072021124129838.png
|
2021-07-16 12:41:29.916512 |
34 |
46495747 |
INSTALATATION OF SAJAL DHARA SUBMARSABLE PUMP WITH PIPE LINE NEAR SHIB MANDIR five |
200000 |
INSTALATATION OF SAJAL DHARA SUBMARSABLE PUMP WITH PIPE LINE NEAR SHIB MANDIR five1 |
Completion of work |
-
latitude : 23.91544333333333
Longitude : 87.82059666666667
file name : Image_12022022120439493.png
|
2022-02-12 12:04:39.557099 |
35 |
46495747 |
INSTALATATION OF SAJAL DHARA SUBMARSABLE PUMP WITH PIPE LINE NEAR SHIB MANDIR five |
200000 |
INSTALATATION OF SAJAL DHARA SUBMARSABLE PUMP WITH PIPE LINE NEAR SHIB MANDIR five1 |
Completion of work |
-
latitude : 23.91544333333333
Longitude : 87.82059666666667
file name : Image_12022022120526456.png
|
2022-02-12 12:05:26.50813 |
36 |
46933747 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 3 AND 4 |
350000 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 3 AND 41 |
Completion of work |
-
latitude : 23.93113166666667
Longitude : 87.80081333333334
file name : Image_04032022113752418.png
|
2022-03-04 11:37:52.527025 |
37 |
46933747 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 3 AND 4 |
350000 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 3 AND 41 |
Completion of work |
-
latitude : 23.931154999999997
Longitude : 87.80083166666667
file name : Image_04032022113930974.png
|
2022-03-04 11:39:31.054988 |
38 |
47171961 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 5 AND 6 |
350000 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 5 AND 61 |
Completion of work |
-
latitude : 23.929646666666667
Longitude : 87.79797666666667
file name : Image_04032022113333433.png
|
2022-03-04 11:33:33.521907 |
39 |
47171961 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 5 AND 6 |
350000 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 5 AND 61 |
Completion of work |
-
latitude : 23.92965
Longitude : 87.79798166666666
file name : Image_04032022113416171.png
|
2022-03-04 11:34:16.266061 |
40 |
34729831 |
CONST OF CULTURAL STAGE AT LOKEPARA COLLEGE MATH AT LOKEPARA CFCG THIRTY THREE |
500000 |
CONST OF CULTURAL STAGE AT LOKEPARA COLLEGE MATH AT LOKEPARA CFCG THIRTY THREE1 |
Completion of work |
-
latitude : 23.925594999999998
Longitude : 87.82888166666667
file name : Image_03112021160412372.png
|
2021-11-03 16:04:12.433752 |
41 |
34729831 |
CONST OF CULTURAL STAGE AT LOKEPARA COLLEGE MATH AT LOKEPARA CFCG THIRTY THREE |
500000 |
CONST OF CULTURAL STAGE AT LOKEPARA COLLEGE MATH AT LOKEPARA CFCG THIRTY THREE1 |
Completion of work |
-
latitude : 23.925594999999998
Longitude : 87.82888166666667
file name : Image_03112021160453176.png
|
2021-11-03 16:04:53.240994 |
42 |
34738837 |
CONST OF PCC ROAD FROM SASTITALA TO GOPAL ASHRAM CFCG THIRTY NINE |
150000 |
CONST OF PCC ROAD FROM SASTITALA TO GOPAL ASHRAM CFCG THIRTY NINE1 |
Completion of work |
-
latitude : 23.930043333333334,23.930043333333334,23.930043333333334,23.930043333333334
Longitude : 87.81528833333331,87.81528833333331,87.81528833333331,87.81528833333331
file name : Image_07102021131517774.png
|
2021-10-07 13:15:17.839828 |
43 |
34738837 |
CONST OF PCC ROAD FROM SASTITALA TO GOPAL ASHRAM CFCG THIRTY NINE |
150000 |
CONST OF PCC ROAD FROM SASTITALA TO GOPAL ASHRAM CFCG THIRTY NINE1 |
Completion of work |
-
latitude : 23.93000833333333,23.93000833333333,23.93000833333333,23.930006666666667
Longitude : 87.81527333333334,87.81527333333334,87.81527499999999,87.81527666666668
file name : Image_05102021154956707.png
|
2021-10-05 15:49:56.790555 |
44 |
34702651 |
CONST OF PCC ROAD FROM B DAS HOUSE TO N DAS HOUSE AT GHUSKARA CFCG EIGHTEEN |
150000 |
CONST OF PCC ROAD FROM B DAS HOUSE TO N DAS HOUSE AT GHUSKARA CFCG EIGHTEEN1 |
Completion of work |
-
latitude : 23.941436666666664,23.941436666666664,23.941436666666664
Longitude : 87.85736166666666,87.85736166666666,87.85736166666666
file name : Image_23092021131649642.png
|
2021-09-23 13:16:49.706382 |
45 |
34702651 |
CONST OF PCC ROAD FROM B DAS HOUSE TO N DAS HOUSE AT GHUSKARA CFCG EIGHTEEN |
150000 |
CONST OF PCC ROAD FROM B DAS HOUSE TO N DAS HOUSE AT GHUSKARA CFCG EIGHTEEN1 |
Completion of work |
-
latitude : 23.941444999999998,23.941444999999998,23.941444999999998,23.941444999999998
Longitude : 87.85738,87.85738,87.85738,87.85738
file name : Image_23092021131748272.png
|
2021-09-23 13:17:48.33265 |
46 |
39084988 |
SOLAR SAJALDHARA SUBMARCIABLE PUMP NEAR AWC AT BAZARHAT TIED TEN |
450000 |
SOLAR SAJALDHARA SUBMARCIABLE PUMP NEAR AWC AT BAZARHAT TIED TEN1 |
Completion of work |
-
latitude : 23.922931666666667
Longitude : 87.82705333333334
file name : Image_07102021131632007.png
|
2021-10-07 13:16:32.078016 |
47 |
39084988 |
SOLAR SAJALDHARA SUBMARCIABLE PUMP NEAR AWC AT BAZARHAT TIED TEN |
450000 |
SOLAR SAJALDHARA SUBMARCIABLE PUMP NEAR AWC AT BAZARHAT TIED TEN1 |
Completion of work |
-
latitude : 23.922956666666664
Longitude : 87.82705166666668
file name : Image_07102021131525115.png
|
2021-10-07 13:15:25.182007 |
48 |
39084988 |
SOLAR SAJALDHARA SUBMARCIABLE PUMP NEAR AWC AT BAZARHAT TIED TEN |
450000 |
SOLAR SAJALDHARA SUBMARCIABLE PUMP NEAR AWC AT BAZARHAT TIED TEN1 |
Completion of work |
-
latitude : 23.922956666666664
Longitude : 87.82705166666668
file name : Image_07102021131521397.png
|
2021-10-07 13:15:21.463333 |
49 |
46866495 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM DIGHI PUKUR TO RANJIT GHOSH LAND AT BELIA |
300000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM DIGHI PUKUR TO RANJIT GHOSH LAND AT BELIA1 |
Completion of work |
-
latitude : 23.922225000000005
Longitude : 87.86236333333333
file name : Image_08122021095852501.png
|
2021-12-08 09:58:52.583475 |
50 |
46866495 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM DIGHI PUKUR TO RANJIT GHOSH LAND AT BELIA |
300000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM DIGHI PUKUR TO RANJIT GHOSH LAND AT BELIA1 |
Completion of work |
-
latitude : 23.922244999999997
Longitude : 87.86234333333331
file name : Image_08122021095812983.png
|
2021-12-08 09:58:13.078797 |
51 |
46494749 |
GP AREA ALL TUBWALL WATER TESTING PURPOSE three |
45521 |
GP AREA ALL TUBWALL WATER TESTING PURPOSE three1 |
Completion of work |
-
latitude : 23.91966
Longitude : 87.84984333333333
file name : Image_15122021145813352.png
|
2021-12-15 14:58:13.441851 |
52 |
46863823 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PUCCA ROAD TO DURGA MANDIR |
150000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PUCCA ROAD TO DURGA MANDIR1 |
Completion of work |
-
latitude : 23.927354999999995,23.927354999999995,23.927354999999995,23.927354999999995
Longitude : 87.81154,87.81154,87.81154,87.81154
file name : Image_04032022114357807.png
|
2022-03-04 11:43:57.884332 |
53 |
46863823 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PUCCA ROAD TO DURGA MANDIR |
150000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PUCCA ROAD TO DURGA MANDIR1 |
Completion of work |
-
latitude : 23.927363333333332,23.927363333333332,23.927363333333332,23.927363333333332
Longitude : 87.81155833333332,87.81155833333332,87.81155833333332,87.81155833333332
file name : Image_04032022114320914.png
|
2022-03-04 11:43:21.03254 |
54 |
46928398 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM VADHU BAGDI HAUSE TO NABAKUMAR KARMAKAR HAUSE |
200000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM VADHU BAGDI HAUSE TO NABAKUMAR KARMAKAR HAUSE1 |
Completion of work |
-
latitude : 23.926251666666666,23.926251666666666,23.926251666666666
Longitude : 87.833745,87.833745,87.833745
file name : Image_08032022102418914.png
|
2022-03-08 10:24:18.990873 |
55 |
46928398 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM VADHU BAGDI HAUSE TO NABAKUMAR KARMAKAR HAUSE |
200000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM VADHU BAGDI HAUSE TO NABAKUMAR KARMAKAR HAUSE1 |
Completion of work |
-
latitude : 23.926248333333334,23.926248333333334,23.926248333333334,23.926248333333334,23.926248333333334,23.926248333333334,23.926248333333334,23.926248333333334
Longitude : 87.83374166666665,87.83374166666665,87.83374166666665,87.83374166666665,87.83374166666665,87.83374166666665,87.83374166666665,87.83374166666665
file name : Image_08032022102512383.png
|
2022-03-08 10:25:12.443066 |
56 |
47254635 |
CONSTRUCTION OF PCC ROAD FROM MANASHA MANDIR TO ILLU HAUSE AT BATNAGAR |
100000 |
CONSTRUCTION OF PCC ROAD FROM MANASHA MANDIR TO ILLU HAUSE AT BATNAGAR1 |
Completion of work |
-
latitude : 23.926246666666664,23.926246666666664,23.926246666666664,23.926231666666663,23.926235
Longitude : 87.83385833333332,87.83385833333332,87.83385833333332,87.83385833333332,87.83385500000001
file name : Image_08032022102654372.png
|
2022-03-08 10:26:54.456019 |
57 |
46492358 |
REPARING AND MAINTIANCS OF GP AREA TUBWALL FOR RE SINKING one |
427240 |
REPARING AND MAINTIANCS OF GP AREA TUBWALL FOR RE SINKING one1 |
Completion of work |
-
latitude : 23.924327
Longitude : 87.8291576
file name : Image_24032022131822532.png
|
2022-03-24 13:18:22.601047 |
58 |
46492358 |
REPARING AND MAINTIANCS OF GP AREA TUBWALL FOR RE SINKING one |
427240 |
REPARING AND MAINTIANCS OF GP AREA TUBWALL FOR RE SINKING one1 |
Completion of work |
-
latitude : 23.9243343
Longitude : 87.8291904
file name : Image_24032022131901260.png
|
2022-03-24 13:19:01.332241 |
59 |
47172265 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 11 AND 12 |
350000 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 11 AND 121 |
Completion of work |
-
latitude : 24.087555
Longitude : 88.17442833333334
file name : Image_23032022185421844.png
|
2022-03-23 18:54:21.925061 |
60 |
68052234 |
Drainage Construction |
280000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.940601386129856
Longitude : 87.85699370317161
file name : Image_20062024120444972.png
|
2024-06-20 12:04:45.051686 |
61 |
68052234 |
Drainage Construction |
280000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.94082929007709
Longitude : 87.85700116306543
file name : Image_13062024144238803.png
|
2024-06-13 14:42:38.889275 |
62 |
68052234 |
Drainage Construction |
280000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.94086147658527
Longitude : 87.85700753331184
file name : Image_25042024125419514.png
|
2024-04-25 12:54:19.597111 |
63 |
34745594 |
CONST OF PCC ROAD FROM NARAYAN MONDAL LAND TO GADADHAR MONDAL LAND AT NISTA CFCG FORTY THREE |
250000 |
CONST OF PCC ROAD FROM NARAYAN MONDAL LAND TO GADADHAR MONDAL LAND AT NISTA CFCG FORTY THREE1 |
Completion of work |
-
latitude : 23.924428333333335,23.923828333333336,23.923828333333336,23.923828333333336,23.92383
Longitude : 87.82919666666666,87.797925,87.797925,87.797925,87.797925
file name : Image_26042022133058883.png
|
2022-04-26 13:30:58.972861 |
64 |
34745594 |
CONST OF PCC ROAD FROM NARAYAN MONDAL LAND TO GADADHAR MONDAL LAND AT NISTA CFCG FORTY THREE |
250000 |
CONST OF PCC ROAD FROM NARAYAN MONDAL LAND TO GADADHAR MONDAL LAND AT NISTA CFCG FORTY THREE1 |
Completion of work |
-
latitude : 23.923853333333334,23.923853333333334,23.923859999999998,23.923859999999998,23.923859999999998,23.923883333333333
Longitude : 87.79790333333334,87.79790333333334,87.79792,87.79792,87.79792,87.79793999999998
file name : Image_26042022133243549.png
|
2022-04-26 13:32:43.633088 |
65 |
34740906 |
CONST OF PCC ROAD FROM PUCCA ROAD TO NANDIHAT PRY. SCHOOL CFCG FORTY |
150000 |
CONST OF PCC ROAD FROM PUCCA ROAD TO NANDIHAT PRY. SCHOOL CFCG FORTY1 |
Roof laid |
-
latitude : 23.929625,23.929625,23.929625
Longitude : 87.818575,87.818575,87.818575
file name : Image_15122020144609545.png
|
2020-12-15 14:46:09.645168 |
66 |
34740906 |
CONST OF PCC ROAD FROM PUCCA ROAD TO NANDIHAT PRY. SCHOOL CFCG FORTY |
150000 |
CONST OF PCC ROAD FROM PUCCA ROAD TO NANDIHAT PRY. SCHOOL CFCG FORTY1 |
Plinth level |
-
latitude : 23.929610000000004,23.92960833333333
Longitude : 87.81857333333333,87.81857333333333
file name : Image_15122020143720257.png
|
2020-12-15 14:37:20.350541 |
67 |
34746633 |
CONST OF PCC ROAD FROM MANGAL CHANDITALA TO ADIBASIPARA AT RAMKRISHNAPUR CFCG FORTY FOUR |
200000 |
CONST OF PCC ROAD FROM MANGAL CHANDITALA TO ADIBASIPARA AT RAMKRISHNAPUR CFCG FORTY FOUR1 |
Roof laid |
-
latitude : 23.931406666666664,23.931406666666664,23.931406666666664
Longitude : 87.82209166666668,87.82209166666668,87.82209166666668
file name : Image_15122020162305262.png
|
2020-12-15 16:23:05.340486 |
68 |
34746633 |
CONST OF PCC ROAD FROM MANGAL CHANDITALA TO ADIBASIPARA AT RAMKRISHNAPUR CFCG FORTY FOUR |
200000 |
CONST OF PCC ROAD FROM MANGAL CHANDITALA TO ADIBASIPARA AT RAMKRISHNAPUR CFCG FORTY FOUR1 |
Plinth level |
-
latitude : 23.931436666666666,23.93144
Longitude : 87.82208999999999,87.82208666666665
file name : Image_15122020144620131.png
|
2020-12-15 14:46:20.2265 |
69 |
34742597 |
CONST OF PCC ROAD FROM MUKHAGNITALA TO GOUTAM MONDAL AMTALA AT NISTA CFCG FORTY TWO |
250000 |
CONST OF PCC ROAD FROM MUKHAGNITALA TO GOUTAM MONDAL AMTALA AT NISTA CFCG FORTY TWO1 |
Roof laid |
-
latitude : 23.92415,23.92415
Longitude : 87.79983333333332,87.79983333333332
file name : Image_15122020141547636.png
|
2020-12-15 14:15:47.696497 |
70 |
34742597 |
CONST OF PCC ROAD FROM MUKHAGNITALA TO GOUTAM MONDAL AMTALA AT NISTA CFCG FORTY TWO |
250000 |
CONST OF PCC ROAD FROM MUKHAGNITALA TO GOUTAM MONDAL AMTALA AT NISTA CFCG FORTY TWO1 |
Completion of work |
-
latitude : 23.924511666666664,23.924511666666664
Longitude : 87.80035666666666,87.80035666666666
file name : Image_15122020140048399.png
|
2020-12-15 14:00:48.458662 |
71 |
34704976 |
CONST OF PCC ROAD FROM NEPALI BAYEN HOUSE TO RAJESH BAYEN HOUSE AT GIDHILA CFCG TWO ONE |
150000 |
CONST OF PCC ROAD FROM NEPALI BAYEN HOUSE TO RAJESH BAYEN HOUSE AT GIDHILA CFCG TWO ONE1 |
Roof laid |
-
latitude : 23.942681666666665,23.942681666666665,23.942681666666665
Longitude : 87.83853666666667,87.83853666666667,87.83853666666667
file name : Image_17122020131111158.png
|
2020-12-17 13:11:11.211325 |
72 |
34704976 |
CONST OF PCC ROAD FROM NEPALI BAYEN HOUSE TO RAJESH BAYEN HOUSE AT GIDHILA CFCG TWO ONE |
150000 |
CONST OF PCC ROAD FROM NEPALI BAYEN HOUSE TO RAJESH BAYEN HOUSE AT GIDHILA CFCG TWO ONE1 |
Plinth level |
-
latitude : 23.942721666666664,23.942721666666664
Longitude : 87.83857833333334,87.83857833333334
file name : Image_17122020130927536.png
|
2020-12-17 13:09:27.598768 |
73 |
46493476 |
REPARING AND MAINTIANCS OF GP AREA TUBWALL FOR REPARING two |
500000 |
REPARING AND MAINTIANCS OF GP AREA TUBWALL FOR REPARING two1 |
Completion of work |
-
latitude : 23.9254948
Longitude : 87.8297879
file name : Image_26082021120229291.png
|
2021-08-26 12:02:29.357179 |
74 |
46493476 |
REPARING AND MAINTIANCS OF GP AREA TUBWALL FOR REPARING two |
500000 |
REPARING AND MAINTIANCS OF GP AREA TUBWALL FOR REPARING two1 |
Completion of work |
-
latitude : 23.9254948
Longitude : 87.8297879
file name : Image_26082021120323027.png
|
2021-08-26 12:03:23.093097 |
75 |
47172961 |
CONSTRUCTUCTION OF MUKHAGANI SHED AT SARKAR PUKUR PAR AT SHIBPUR |
150000 |
CONSTRUCTUCTION OF MUKHAGANI SHED AT SARKAR PUKUR PAR AT SHIBPUR 1 |
Completion of work |
-
latitude : 23.94875018
Longitude : 87.84321182
file name : Image_11072022165553463.png
|
2022-07-11 16:55:53.61376 |
76 |
47172961 |
CONSTRUCTUCTION OF MUKHAGANI SHED AT SARKAR PUKUR PAR AT SHIBPUR |
150000 |
CONSTRUCTUCTION OF MUKHAGANI SHED AT SARKAR PUKUR PAR AT SHIBPUR 1 |
Completion of work |
-
latitude : 23.94877432
Longitude : 87.84320832
file name : Image_11072022165648164.png
|
2022-07-11 16:56:48.276301 |
77 |
56763669 |
CONST OF PCC DRAIN WITH COVER AND SOAK PIT FROM SHIV BARI TO MATH AT NABAGRAM SANITATION THIRTEEN |
150000 |
CONST OF PCC DRAIN WITH COVER AND SOAK PIT FROM SHIV BARI TO MATH AT NABAGRAM SANITATION THIRTEEN1 |
Plinth level |
-
latitude : 23.91464120708406,23.914691163226962,23.914679512381554,23.91467892564833
Longitude : 87.82003353349864,87.81993437558413,87.81994384713471,87.81996429897845
file name : Image_04052023102804590.png
|
2023-05-04 10:28:04.663467 |
78 |
56763669 |
CONST OF PCC DRAIN WITH COVER AND SOAK PIT FROM SHIV BARI TO MATH AT NABAGRAM SANITATION THIRTEEN |
150000 |
CONST OF PCC DRAIN WITH COVER AND SOAK PIT FROM SHIV BARI TO MATH AT NABAGRAM SANITATION THIRTEEN1 |
Completion of work |
-
latitude : 23.92435,23.92435
Longitude : 87.8292935,87.8292935
file name : Image_20042023114746589.png
|
2023-04-20 11:47:46.675822 |
79 |
46931225 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 1 AND 2 |
350000 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 1 AND 2 1 |
Completion of work |
-
latitude : 23.946944139897823
Longitude : 87.84078301861882
file name : Image_24082022142018177.png
|
2022-08-24 14:20:18.251037 |
80 |
47172126 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 9 AND 10 |
350000 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 9 AND 101 |
Completion of work |
-
latitude : 23.92889475915581
Longitude : 87.83033296465874
file name : Image_24082022140548189.png
|
2022-08-24 14:05:48.253924 |
81 |
47254079 |
CONSTRUCTUCTION OF MUKHAGANI SHED TALTALA RASUNPUR |
150000 |
CONSTRUCTUCTION OF MUKHAGANI SHED TALTALA RASUNPUR1 |
Completion of work |
-
latitude : 23.916284814476967
Longitude : 87.82960298471153
file name : Image_24082022174307491.png
|
2022-08-24 17:43:07.580903 |
82 |
46928732 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM TALBANA PAR TO KATAR AT DHEKA |
172760 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM TALBANA PAR TO KATAR AT DHEKA1 |
Completion of work |
-
latitude : 23.929580440744758,23.92956979572773
Longitude : 87.82698682509363,87.82701507210732
file name : Image_14112022144725041.png
|
2022-11-14 14:47:25.140977 |
83 |
46928732 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM TALBANA PAR TO KATAR AT DHEKA |
172760 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM TALBANA PAR TO KATAR AT DHEKA1 |
Completion of work |
-
latitude : 23.92955219373107,23.929486060515046
Longitude : 87.82704784534872,87.8269656188786
file name : Image_10112022154858250.png
|
2022-11-10 15:48:58.362263 |
84 |
46928732 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM TALBANA PAR TO KATAR AT DHEKA |
172760 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM TALBANA PAR TO KATAR AT DHEKA1 |
Completion of work |
-
latitude : 23.9243492,23.9243492,23.9243492
Longitude : 87.8293126,87.8293126,87.8293126
file name : Image_10112022154901415.png
|
2022-11-10 15:49:01.514402 |
85 |
46496443 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PARESH MANDAL HAUSE TO BUDDHADEB MANDAL six |
200000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PARESH MANDAL HAUSE TO BUDDHADEB MANDAL six1 |
Plinth level |
-
latitude : 23.944823333333336,23.944823333333336,23.944823333333336,23.944816666666664,23.944816666666664,23.944816666666664
Longitude : 87.83819166666666,87.83819166666666,87.83819166666666,87.83819,87.83819,87.83819
file name : Image_24052022162427987.png
|
2022-05-24 16:24:28.05211 |
86 |
46496443 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PARESH MANDAL HAUSE TO BUDDHADEB MANDAL six |
200000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PARESH MANDAL HAUSE TO BUDDHADEB MANDAL six1 |
Plinth level |
-
latitude : 23.944830000000003,23.944830000000003,23.944830000000003,23.94482833333333
Longitude : 87.83821333333331,87.83821333333331,87.83821333333331,87.83821000000002
file name : Image_24052022162528639.png
|
2022-05-24 16:25:28.70899 |
87 |
47172027 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 7 AND 8 |
350000 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 7 AND 81 |
Completion of work |
-
latitude : 23.92999599
Longitude : 87.81535094
file name : Image_04072022170739680.png
|
2022-07-04 17:07:39.786113 |
88 |
46789860 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PRABHAT BHANDARI HAUSE TO SADESH MONDAL HAUSE |
200000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PRABHAT BHANDARI HAUSE TO SADESH MONDAL HAUSE |
Completion of work |
-
latitude : 23.9450305,23.94475263
Longitude : 87.8391659,87.83924814
file name : Image_05072022145348027.png
|
2022-07-05 14:53:48.12612 |
89 |
46789860 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PRABHAT BHANDARI HAUSE TO SADESH MONDAL HAUSE |
200000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PRABHAT BHANDARI HAUSE TO SADESH MONDAL HAUSE |
Completion of work |
-
latitude : 23.94505565,23.94530828
Longitude : 87.83948421,87.83964186
file name : Image_05072022145540147.png
|
2022-07-05 14:55:40.252068 |
90 |
47172386 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 13 AND 14 |
350000 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 13 AND 141 |
Plinth level |
-
latitude : 23.91690507531166
Longitude : 87.8270068578422
file name : Image_04052023103910191.png
|
2023-05-04 10:39:10.274554 |
91 |
47172386 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 13 AND 14 |
350000 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 13 AND 141 |
Plinth level |
-
latitude : 23.916754494421184
Longitude : 87.82685221172869
file name : Image_03052023142414070.png
|
2023-05-03 14:24:14.152164 |
92 |
47172386 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 13 AND 14 |
350000 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 13 AND 141 |
Plinth level |
-
latitude : 23.9168977830559
Longitude : 87.82691448926926
file name : Image_20042023114754915.png
|
2023-04-20 11:47:55.004987 |
93 |
47172386 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 13 AND 14 |
350000 |
INSTALATATION OF SOLAR STREET LIGHT FOR SANSAD 13 AND 141 |
Completion of work |
-
latitude : 23.916884874925017
Longitude : 87.8270020801574
file name : Image_18042023114022478.png
|
2023-04-18 11:40:22.592 |
94 |
56752469 |
CONST OF PCC DRAIN WITH COVER AND SOAK PITH FROM R SK HOUSE TO A SK LAND AT CHUATARI SANITATION TWO |
150000 |
CONST OF PCC DRAIN WITH COVER AND SOAK PITH FROM R SK HOUSE TO A SK LAND AT CHUATARI SANITATION TWO1 |
Roof laid |
-
latitude : 23.930498133413494,23.930498133413494,23.930552448146045
Longitude : 87.8013236168772,87.8013236168772,87.8017118666321
file name : Image_17052023172139837.png
|
2023-05-17 17:21:39.91586 |
95 |
56752469 |
CONST OF PCC DRAIN WITH COVER AND SOAK PITH FROM R SK HOUSE TO A SK LAND AT CHUATARI SANITATION TWO |
150000 |
CONST OF PCC DRAIN WITH COVER AND SOAK PITH FROM R SK HOUSE TO A SK LAND AT CHUATARI SANITATION TWO1 |
Plinth level |
-
latitude : 23.9248864,23.93057486973703
Longitude : 87.7810987,87.80178260989487
file name : Image_03052023142406842.png
|
2023-05-03 14:24:06.914601 |
96 |
56752469 |
CONST OF PCC DRAIN WITH COVER AND SOAK PITH FROM R SK HOUSE TO A SK LAND AT CHUATARI SANITATION TWO |
150000 |
CONST OF PCC DRAIN WITH COVER AND SOAK PITH FROM R SK HOUSE TO A SK LAND AT CHUATARI SANITATION TWO1 |
Completion of work |
-
latitude : 23.930557183921337,23.930491427890956
Longitude : 87.80169786885381,87.80174782499671
file name : Image_17042023131652533.png
|
2023-04-17 13:16:52.621315 |
97 |
56679434 |
RENOVATION WORK OF CULTURAL STAGE AT LOKEPARA COLLEGE MATH AT LOKEPARA TWELVE UNTIED |
300000 |
RENOVATION WORK OF CULTURAL STAGE AT LOKEPARA COLLEGE MATH AT LOKEPARA TWELVE UNTIED1 |
Completion of work |
-
latitude : 23.92557917162776
Longitude : 87.82876688987017
file name : Image_10052023112639087.png
|
2023-05-10 11:26:39.161419 |
98 |
56679434 |
RENOVATION WORK OF CULTURAL STAGE AT LOKEPARA COLLEGE MATH AT LOKEPARA TWELVE UNTIED |
300000 |
RENOVATION WORK OF CULTURAL STAGE AT LOKEPARA COLLEGE MATH AT LOKEPARA TWELVE UNTIED1 |
Completion of work |
-
latitude : 23.92436811234802
Longitude : 87.82925756648183
file name : Image_04052023130839751.png
|
2023-05-04 13:08:39.818483 |
99 |
56756003 |
CONST OF PCC DRAIN WITH COVER AND SOAK PIT FROM P ROAD TO KADER PUKUR AT BAZARHAT SANITATION NINE |
150000 |
CONST OF PCC DRAIN WITH COVER AND SOAK PIT FROM P ROAD TO KADER PUKUR AT BAZARHAT SANITATION NINE1 |
Plinth level |
-
latitude : 23.9240091,23.92381406854838
Longitude : 87.8249854,87.82548227347434
file name : Image_09062023121232172.png
|
2023-06-09 12:12:32.235623 |
100 |
56756003 |
CONST OF PCC DRAIN WITH COVER AND SOAK PIT FROM P ROAD TO KADER PUKUR AT BAZARHAT SANITATION NINE |
150000 |
CONST OF PCC DRAIN WITH COVER AND SOAK PIT FROM P ROAD TO KADER PUKUR AT BAZARHAT SANITATION NINE1 |
Completion of work |
-
latitude : 23.9240128,23.9240116
Longitude : 87.8249921,87.8249904
file name : Image_10052023121724787.png
|
2023-05-10 12:17:24.869292 |
101 |
56752018 |
CONSTRUCTION OF PCC DRAIN WITH COVER AND SOAK PIT FROM KALIGORE N SIDE J PAL LAND TO SANITATION ONE |
150000 |
CONSTRUCTION OF PCC DRAIN WITH COVER AND SOAK PIT FROM KALIGORE N SIDE J PAL LAND TO SANITATION ONE1 |
Roof laid |
-
latitude : 23.927783109247684,23.927811314351857
Longitude : 87.84576572477818,87.84574418328702
file name : Image_01062023123552870.png
|
2023-06-01 12:35:52.958826 |
102 |
56752018 |
CONSTRUCTION OF PCC DRAIN WITH COVER AND SOAK PIT FROM KALIGORE N SIDE J PAL LAND TO SANITATION ONE |
150000 |
CONSTRUCTION OF PCC DRAIN WITH COVER AND SOAK PIT FROM KALIGORE N SIDE J PAL LAND TO SANITATION ONE1 |
Plinth level |
-
latitude : 23.927767854183912,23.9276985777542
Longitude : 87.84570520743728,87.84574879333377
file name : Image_16052023105458063.png
|
2023-05-16 10:54:58.139015 |
103 |
56752018 |
CONSTRUCTION OF PCC DRAIN WITH COVER AND SOAK PIT FROM KALIGORE N SIDE J PAL LAND TO SANITATION ONE |
150000 |
CONSTRUCTION OF PCC DRAIN WITH COVER AND SOAK PIT FROM KALIGORE N SIDE J PAL LAND TO SANITATION ONE1 |
Completion of work |
-
latitude : 23.927691453136504,23.927696063183248
Longitude : 87.84571333788335,87.84575650468469
file name : Image_15052023125233151.png
|
2023-05-15 12:52:33.239863 |
104 |
56752018 |
CONSTRUCTION OF PCC DRAIN WITH COVER AND SOAK PIT FROM KALIGORE N SIDE J PAL LAND TO SANITATION ONE |
150000 |
CONSTRUCTION OF PCC DRAIN WITH COVER AND SOAK PIT FROM KALIGORE N SIDE J PAL LAND TO SANITATION ONE1 |
Completion of work |
-
latitude : 23.927697697654366,23.927756873890758
Longitude : 87.84568450413644,87.84572859294713
file name : Image_04052023085731885.png
|
2023-05-04 08:57:31.958538 |
105 |
56763386 |
CONST OF PCC D W C AND S PIT F D MUDI H TO S MUDI H AT LOKEPARA SANITATION TWELVE |
150000 |
CONST OF PCC D W C AND S PIT F D MUDI H TO S MUDI H AT LOKEPARA SANITATION TWELVE1 |
Roof laid |
-
latitude : 23.93146611750126,23.931485982611775,23.931530825793743
Longitude : 87.83155554905534,87.83155077137053,87.83160609193146
file name : Image_17052023145537084.png
|
2023-05-17 14:55:37.155334 |
106 |
56763386 |
CONST OF PCC D W C AND S PIT F D MUDI H TO S MUDI H AT LOKEPARA SANITATION TWELVE |
150000 |
CONST OF PCC D W C AND S PIT F D MUDI H TO S MUDI H AT LOKEPARA SANITATION TWELVE1 |
Plinth level |
-
latitude : 23.93145266454667,23.93149310722947
Longitude : 87.83156384713948,87.83149628899992
file name : Image_15052023122321546.png
|
2023-05-15 12:23:21.619573 |
107 |
56763386 |
CONST OF PCC D W C AND S PIT F D MUDI H TO S MUDI H AT LOKEPARA SANITATION TWELVE |
150000 |
CONST OF PCC D W C AND S PIT F D MUDI H TO S MUDI H AT LOKEPARA SANITATION TWELVE1 |
Completion of work |
-
latitude : 23.931544362567365,23.931586565449834,23.931564521044493
Longitude : 87.83133284188807,87.83135371282697,87.83134466037154
file name : Image_04052023085724208.png
|
2023-05-04 08:57:24.277343 |
108 |
46864159 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM JADAB BHANDARI HAUSE TO ANANDA BHALLA HAUSE A |
300000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM JADAB BHANDARI HAUSE TO ANANDA BHALLA HAUSE A1 |
Plinth level |
-
latitude : 23.928386899642646,23.92838199622929
Longitude : 87.83782621845603,87.83784784376621
file name : Image_05092022115058077.png
|
2022-09-05 11:50:58.181441 |
109 |
46864159 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM JADAB BHANDARI HAUSE TO ANANDA BHALLA HAUSE A |
300000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM JADAB BHANDARI HAUSE TO ANANDA BHALLA HAUSE A1 |
Completion of work |
-
latitude : 23.928359490819275,23.928369004279375
Longitude : 87.83772303722799,87.83770124427974
file name : Image_08082022154001994.png
|
2022-08-08 15:40:02.078605 |
110 |
39091420 |
CONST OF N PCC DN W C AND S PIT NEAR N A SK TO A SK H AT DOGACHI TIED ONE EIGHT |
200000 |
CONST OF N PCC DN W C AND S PIT NEAR N A SK TO A SK H AT DOGACHI TIED ONE EIGHT1 |
Completion of work |
-
latitude : 23.92709333333333,23.92709333333333,23.92709333333333
Longitude : 87.786465,87.786465,87.786465
file name : Image_08092021090024263.png
|
2021-09-08 09:00:24.34813 |
111 |
39091420 |
CONST OF N PCC DN W C AND S PIT NEAR N A SK TO A SK H AT DOGACHI TIED ONE EIGHT |
200000 |
CONST OF N PCC DN W C AND S PIT NEAR N A SK TO A SK H AT DOGACHI TIED ONE EIGHT1 |
Completion of work |
-
latitude : 23.927118333333336,23.927118333333336,23.927118333333336,23.927121666666668
Longitude : 87.7865,87.7865,87.7865,87.786505
file name : Image_08092021090110470.png
|
2021-09-08 09:01:10.533823 |
112 |
39091317 |
CONST OF N PCC DR WITH C AND S PIT F A DAS H TO LAW P AT KULIARA TIED ONE FOUR |
200000 |
CONST OF N PCC DR WITH C AND S PIT F A DAS H TO LAW P AT KULIARA TIED ONE FOUR1 |
Completion of work |
-
latitude : 23.928338333333333,23.928338333333333,23.928338333333333
Longitude : 87.83407166666666,87.83407166666666,87.83407166666666
file name : Image_08072021162824719.png
|
2021-07-08 16:28:24.790894 |
113 |
46863355 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PACHKARI HAZRA HAUSE TO ARUN DALUI HAUSE AT L |
250000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PACHKARI HAZRA HAUSE TO ARUN DALUI HAUSE AT L1 |
Completion of work |
-
latitude : 23.92894666666667,23.928951666666663,23.92895,23.92895
Longitude : 87.82954666666667,87.82954666666667,87.82954333333333,87.82954666666667
file name : Image_04032022120004306.png
|
2022-03-04 12:00:04.381862 |
114 |
46863355 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PACHKARI HAZRA HAUSE TO ARUN DALUI HAUSE AT L |
250000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PACHKARI HAZRA HAUSE TO ARUN DALUI HAUSE AT L1 |
Completion of work |
-
latitude : 23.928935000000003,23.928939999999997,23.928939999999997
Longitude : 87.82956833333334,87.82957,87.82957
file name : Image_04032022115901385.png
|
2022-03-04 11:59:01.465804 |
115 |
46863355 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PACHKARI HAZRA HAUSE TO ARUN DALUI HAUSE AT L |
250000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PACHKARI HAZRA HAUSE TO ARUN DALUI HAUSE AT L1 |
Completion of work |
-
latitude : 23.928338333333333,23.928338333333333,23.928338333333333,23.928338333333333,23.928338333333333
Longitude : 87.82954666666667,87.82954666666667,87.82954666666667,87.82954666666667,87.82955166666667
file name : Image_25022022150132950.png
|
2022-02-25 15:01:33.03047 |
116 |
46863355 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PACHKARI HAZRA HAUSE TO ARUN DALUI HAUSE AT L |
250000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PACHKARI HAZRA HAUSE TO ARUN DALUI HAUSE AT L1 |
Completion of work |
-
latitude : 23.928353333333334,23.928353333333334,23.928350000000002,23.928350000000002
Longitude : 87.82953666666666,87.82953666666666,87.82953833333335,87.82953833333335
file name : Image_25022022150218169.png
|
2022-02-25 15:02:18.245022 |
117 |
46929145 |
CONSTRUCTION OF CULVERT WITH DRAIN FROM HANIF MOLLA LAND AT BUDUR |
300000 |
CONSTRUCTION OF CULVERT WITH DRAIN FROM HANIF MOLLA LAND AT BUDUR1 |
Completion of work |
-
latitude : 23.923207302577794,23.923207302577794,23.92325042746961,23.923228047788143
Longitude : 87.7875482942909,87.7875482942909,87.78751216828823,87.78748693875968
file name : Image_16112022153419317.png
|
2022-11-16 15:34:19.403295 |
118 |
39092023 |
CONST OF N PCC F CHANEL FROM MANIKANIKA TO R N DAS LD AT BUDUR TIED SEVEN |
200000 |
CONST OF N PCC F CHANEL FROM MANIKANIKA TO R N DAS LD AT BUDUR TIED SEVEN1 |
Completion of work |
-
latitude : 23.925486666666664,23.925486666666664,23.925486666666664
Longitude : 87.78591499999999,87.78591499999999,87.78591499999999
file name : Image_08092021090509342.png
|
2021-09-08 09:05:09.393777 |
119 |
39092023 |
CONST OF N PCC F CHANEL FROM MANIKANIKA TO R N DAS LD AT BUDUR TIED SEVEN |
200000 |
CONST OF N PCC F CHANEL FROM MANIKANIKA TO R N DAS LD AT BUDUR TIED SEVEN1 |
Completion of work |
-
latitude : 23.925483333333332,23.925483333333332,23.925483333333332
Longitude : 87.78591166666665,87.78591166666665,87.78591166666665
file name : Image_08092021090551695.png
|
2021-09-08 09:05:51.747941 |
120 |
46927781 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM RAHAMAT HOUSE TO JAHANGIR HOUSE AT BATNAGAR |
150000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM RAHAMAT HOUSE TO JAHANGIR HOUSE AT BATNAGAR1 |
Plinth level |
-
latitude : 23.930487823672593,23.930495660752058
Longitude : 87.80128614977002,87.80128329992294
file name : Image_03032023122207253.png
|
2023-03-03 12:22:07.34879 |
121 |
46927781 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM RAHAMAT HOUSE TO JAHANGIR HOUSE AT BATNAGAR |
150000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM RAHAMAT HOUSE TO JAHANGIR HOUSE AT BATNAGAR1 |
Completion of work |
-
latitude : 23.93065659329295,23.93066602293402
Longitude : 87.80130341649055,87.80132101848722
file name : Image_16112022154537012.png
|
2022-11-16 15:45:37.09683 |
122 |
39080724 |
CONST OF NEW PCC DRAIN WITH COVER AND SOAK PIT FROM S BHANDARI HOUSE TO AKRA AT TILDANGA |
150000 |
CONST OF NEW PCC DRAIN WITH COVER AND SOAK PIT FROM S BHANDARI HOUSE TO AKRA AT TILDANGA1 |
Completion of work |
-
latitude : 23.925871666666662,23.925873333333335,23.925873333333335
Longitude : 87.83313000000001,87.83313166666667,87.83313166666667
file name : Image_02082021090027474.png
|
2021-08-02 09:00:27.54475 |
123 |
39080724 |
CONST OF NEW PCC DRAIN WITH COVER AND SOAK PIT FROM S BHANDARI HOUSE TO AKRA AT TILDANGA |
150000 |
CONST OF NEW PCC DRAIN WITH COVER AND SOAK PIT FROM S BHANDARI HOUSE TO AKRA AT TILDANGA1 |
Completion of work |
-
latitude : 23.928638333333332,23.928638333333332,23.928638333333332
Longitude : 87.83838166666668,87.83838166666668,87.83838166666668
file name : Image_08072021163248044.png
|
2021-07-08 16:32:48.127722 |
124 |
39067097 |
CONST OF NEW PCC FILED CHANEL FROM SWADESH MONDAL HOUSE TO SURESH BASU HOUSE AT GIDHILA |
350000 |
CONST OF NEW PCC FILED CHANEL FROM SWADESH MONDAL HOUSE TO SURESH BASU HOUSE AT GIDHILA1 |
Completion of work |
-
latitude : 23.945929999999997,23.945929999999997,23.945929999999997,23.945929999999997
Longitude : 87.83956500000001,87.83956500000001,87.83956500000001,87.83956500000001
file name : Image_13012022141235230.png
|
2022-01-13 14:12:35.301506 |
125 |
39067097 |
CONST OF NEW PCC FILED CHANEL FROM SWADESH MONDAL HOUSE TO SURESH BASU HOUSE AT GIDHILA |
350000 |
CONST OF NEW PCC FILED CHANEL FROM SWADESH MONDAL HOUSE TO SURESH BASU HOUSE AT GIDHILA1 |
Completion of work |
-
latitude : 23.94592,23.94592,23.94592,23.94592,23.94592
Longitude : 87.83955499999999,87.83955499999999,87.83955499999999,87.83955499999999,87.83955499999999
file name : Image_13012022141239510.png
|
2022-01-13 14:12:39.577454 |
126 |
39067097 |
CONST OF NEW PCC FILED CHANEL FROM SWADESH MONDAL HOUSE TO SURESH BASU HOUSE AT GIDHILA |
350000 |
CONST OF NEW PCC FILED CHANEL FROM SWADESH MONDAL HOUSE TO SURESH BASU HOUSE AT GIDHILA1 |
Completion of work |
-
latitude : 23.94592,23.94592,23.94592,23.94592,23.94592
Longitude : 87.83955499999999,87.83955499999999,87.83955499999999,87.83955499999999,87.83955499999999
file name : Image_13012022141243060.png
|
2022-01-13 14:12:43.129276 |
127 |
39067097 |
CONST OF NEW PCC FILED CHANEL FROM SWADESH MONDAL HOUSE TO SURESH BASU HOUSE AT GIDHILA |
350000 |
CONST OF NEW PCC FILED CHANEL FROM SWADESH MONDAL HOUSE TO SURESH BASU HOUSE AT GIDHILA1 |
Completion of work |
-
latitude : 23.945925000000003,23.945925000000003,23.945925000000003,23.945925000000003,23.945925000000003
Longitude : 87.83955166666668,87.83955166666668,87.83955166666668,87.83955166666668,87.83955166666668
file name : Image_13012022141331510.png
|
2022-01-13 14:13:31.579928 |
128 |
39091368 |
CONST O N PCC F CHANEL F B TUDU LD TO A PAL LD AT BANDIHAT TIED SIXTEEN |
150000 |
CONST O N PCC F CHANEL F B TUDU LD TO A PAL LD AT BANDIHAT TIED SIXTEEN1 |
Completion of work |
-
latitude : 23.94280666666667,23.94280666666667
Longitude : 87.81277666666668,87.81277666666668
file name : Image_25012021122017919.png
|
2021-01-25 12:20:17.979758 |
129 |
39091368 |
CONST O N PCC F CHANEL F B TUDU LD TO A PAL LD AT BANDIHAT TIED SIXTEEN |
150000 |
CONST O N PCC F CHANEL F B TUDU LD TO A PAL LD AT BANDIHAT TIED SIXTEEN1 |
Completion of work |
-
latitude : 23.94279333333333,23.942819999999998,23.942815000000003
Longitude : 87.81277833333334,87.81278333333333,87.812775
file name : Image_25012021121304279.png
|
2021-01-25 12:13:04.342056 |
130 |
46790046 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM KONAI PARA TO SWAPAN KONAI HAUSE MOUZA NISTA |
150000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM KONAI PARA TO SWAPAN KONAI HAUSE MOUZA NISTA 1 |
Completion of work |
-
latitude : 23.923998260870576,23.923737625591457
Longitude : 87.79532259330153,87.79562015086412
file name : Image_27082022163840549.png
|
2022-08-27 16:38:40.663214 |
131 |
39080846 |
CONST OF NEW PCC FIELD CHANEL FROM B T MONDAL HOUSE TO KANDAR AT DHEKA |
150000 |
CONST OF NEW PCC FIELD CHANEL FROM B T MONDAL HOUSE TO KANDAR AT DHEKA1 |
Completion of work |
-
latitude : 23.929885,23.929885
Longitude : 87.82743833333333,87.82743833333333
file name : Image_28012021120237295.png
|
2021-01-28 12:02:37.358937 |
132 |
39080846 |
CONST OF NEW PCC FIELD CHANEL FROM B T MONDAL HOUSE TO KANDAR AT DHEKA |
150000 |
CONST OF NEW PCC FIELD CHANEL FROM B T MONDAL HOUSE TO KANDAR AT DHEKA1 |
Completion of work |
-
latitude : 23.929885,23.929885
Longitude : 87.82743833333333,87.82743833333333
file name : Image_28012021120244675.png
|
2021-01-28 12:02:44.726232 |
133 |
39080846 |
CONST OF NEW PCC FIELD CHANEL FROM B T MONDAL HOUSE TO KANDAR AT DHEKA |
150000 |
CONST OF NEW PCC FIELD CHANEL FROM B T MONDAL HOUSE TO KANDAR AT DHEKA1 |
Completion of work |
-
latitude : 23.929914999999998,23.929916666666667
Longitude : 87.82742000000002,87.82742000000002
file name : Image_28012021120323821.png
|
2021-01-28 12:03:23.870347 |
134 |
39080846 |
CONST OF NEW PCC FIELD CHANEL FROM B T MONDAL HOUSE TO KANDAR AT DHEKA |
150000 |
CONST OF NEW PCC FIELD CHANEL FROM B T MONDAL HOUSE TO KANDAR AT DHEKA1 |
Completion of work |
-
latitude : 23.92996666666666,23.92996666666666
Longitude : 87.82744333333333,87.82744333333333
file name : Image_20012021131024236.png
|
2021-01-20 13:10:24.30485 |
135 |
39080846 |
CONST OF NEW PCC FIELD CHANEL FROM B T MONDAL HOUSE TO KANDAR AT DHEKA |
150000 |
CONST OF NEW PCC FIELD CHANEL FROM B T MONDAL HOUSE TO KANDAR AT DHEKA1 |
Completion of work |
-
latitude : 23.930006666666667,23.930006666666667
Longitude : 87.82742333333333,87.82742333333333
file name : Image_20012021130203172.png
|
2021-01-20 13:02:03.225208 |
136 |
39091524 |
CONST OF N PCC DN INC S PIT AND CO NEAR CUL TO S POND AT KUMARPUR TIED TWENTY |
300000 |
CONST OF N PCC DN INC S PIT AND CO NEAR CUL TO S POND AT KUMARPUR TIED TWENTY1 |
Completion of work |
-
latitude : 23.92392333333333,23.92392333333333,23.92392333333333
Longitude : 87.82471833333332,87.82471833333332,87.82471833333332
file name : Image_05102021154206693.png
|
2021-10-05 15:42:06.766645 |
137 |
39091524 |
CONST OF N PCC DN INC S PIT AND CO NEAR CUL TO S POND AT KUMARPUR TIED TWENTY |
300000 |
CONST OF N PCC DN INC S PIT AND CO NEAR CUL TO S POND AT KUMARPUR TIED TWENTY1 |
Completion of work |
-
latitude : 23.92392333333333,23.92392333333333,23.92392333333333,23.923926666666663
Longitude : 87.82471833333332,87.82471833333332,87.82471833333332,87.82471666666667
file name : Image_05102021154256375.png
|
2021-10-05 15:42:56.458645 |
138 |
39092040 |
CONST OF N PCC F CHANEL F S N GHOSH LD TO G GHOSH LD AT GHAGRAPARA TIED EIGHT |
150000 |
CONST OF N PCC F CHANEL F S N GHOSH LD TO G GHOSH LD AT GHAGRAPARA TIED EIGHT1 |
Completion of work |
-
latitude : 23.92594166666667,23.92594166666667,23.92594166666667,23.92594166666667
Longitude : 87.83316333333332,87.83316333333332,87.83316333333332,87.83316333333332
file name : Image_22092021174852257.png
|
2021-09-22 17:48:52.329213 |
139 |
39092040 |
CONST OF N PCC F CHANEL F S N GHOSH LD TO G GHOSH LD AT GHAGRAPARA TIED EIGHT |
150000 |
CONST OF N PCC F CHANEL F S N GHOSH LD TO G GHOSH LD AT GHAGRAPARA TIED EIGHT1 |
Completion of work |
-
latitude : 23.92594,23.92594,23.92594
Longitude : 87.83316500000001,87.83316500000001,87.83316500000001
file name : Image_22092021174857807.png
|
2021-09-22 17:48:57.874541 |
140 |
39092040 |
CONST OF N PCC F CHANEL F S N GHOSH LD TO G GHOSH LD AT GHAGRAPARA TIED EIGHT |
150000 |
CONST OF N PCC F CHANEL F S N GHOSH LD TO G GHOSH LD AT GHAGRAPARA TIED EIGHT1 |
Completion of work |
-
latitude : 23.925951666666666,23.925951666666666,23.925951666666666
Longitude : 87.83309833333333,87.83309833333333,87.83309833333333
file name : Image_22092021174903324.png
|
2021-09-22 17:49:03.389232 |
141 |
39092040 |
CONST OF N PCC F CHANEL F S N GHOSH LD TO G GHOSH LD AT GHAGRAPARA TIED EIGHT |
150000 |
CONST OF N PCC F CHANEL F S N GHOSH LD TO G GHOSH LD AT GHAGRAPARA TIED EIGHT1 |
Completion of work |
-
latitude : 23.925990000000002,23.925990000000002,23.925990000000002,23.925990000000002
Longitude : 87.83319666666667,87.83319666666667,87.83319666666667,87.83319666666667
file name : Image_22092021174908964.png
|
2021-09-22 17:49:09.030374 |
142 |
39092040 |
CONST OF N PCC F CHANEL F S N GHOSH LD TO G GHOSH LD AT GHAGRAPARA TIED EIGHT |
150000 |
CONST OF N PCC F CHANEL F S N GHOSH LD TO G GHOSH LD AT GHAGRAPARA TIED EIGHT1 |
Completion of work |
-
latitude : 23.92594166666667,23.92594166666667,23.92594166666667
Longitude : 87.83314833333334,87.83314833333334,87.83314833333334
file name : Image_22092021174914421.png
|
2021-09-22 17:49:14.485414 |
143 |
39092040 |
CONST OF N PCC F CHANEL F S N GHOSH LD TO G GHOSH LD AT GHAGRAPARA TIED EIGHT |
150000 |
CONST OF N PCC F CHANEL F S N GHOSH LD TO G GHOSH LD AT GHAGRAPARA TIED EIGHT1 |
Completion of work |
-
latitude : 23.92594,23.92594,23.92594
Longitude : 87.83316500000001,87.83316500000001,87.83316500000001
file name : Image_22092021174920139.png
|
2021-09-22 17:49:20.202645 |
144 |
39092040 |
CONST OF N PCC F CHANEL F S N GHOSH LD TO G GHOSH LD AT GHAGRAPARA TIED EIGHT |
150000 |
CONST OF N PCC F CHANEL F S N GHOSH LD TO G GHOSH LD AT GHAGRAPARA TIED EIGHT1 |
Completion of work |
-
latitude : 23.925951666666666,23.925951666666666,23.925951666666666
Longitude : 87.83309833333333,87.83309833333333,87.83309833333333
file name : Image_22092021174925360.png
|
2021-09-22 17:49:25.423791 |
145 |
39092040 |
CONST OF N PCC F CHANEL F S N GHOSH LD TO G GHOSH LD AT GHAGRAPARA TIED EIGHT |
150000 |
CONST OF N PCC F CHANEL F S N GHOSH LD TO G GHOSH LD AT GHAGRAPARA TIED EIGHT1 |
Completion of work |
-
latitude : 23.925990000000002,23.925990000000002,23.925990000000002,23.925990000000002
Longitude : 87.83319666666667,87.83319666666667,87.83319666666667,87.83319666666667
file name : Image_22092021174930431.png
|
2021-09-22 17:49:30.496891 |
146 |
46495267 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PUCC A RASTA TO SIBTALA MATH AT NABAGRAM four |
150000 |
CONSTRACTION OF PCC DRAIN WITH COVER AND SOCK PIT FROM PUCC A RASTA TO SIBTALA MATH AT NABAGRAM four1 |
Completion of work |
-
latitude : 24.013851592317224,23.915619333274662,23.915576920844615
Longitude : 87.69300864078104,87.82038884237409,87.82041692174971
file name : Image_08082022121621150.png
|
2022-08-08 12:16:21.247332 |
147 |
34707436 |
CONST OF PCC DRAIN FROM GOLAK DAS HOUSE TO BHADU BAGDI HOUSE CFCG TWO FOUR |
150000 |
CONST OF PCC DRAIN FROM GOLAK DAS HOUSE TO BHADU BAGDI HOUSE CFCG TWO FOUR1 |
Completion of work |
-
latitude : 23.92624166666667,23.92624166666667,23.92624166666667,23.92624166666667
Longitude : 87.83322166666667,87.83322166666667,87.83322166666667,87.83322166666667
file name : Image_08092021145804268.png
|
2021-09-08 14:58:04.351116 |
148 |
34707436 |
CONST OF PCC DRAIN FROM GOLAK DAS HOUSE TO BHADU BAGDI HOUSE CFCG TWO FOUR |
150000 |
CONST OF PCC DRAIN FROM GOLAK DAS HOUSE TO BHADU BAGDI HOUSE CFCG TWO FOUR1 |
Completion of work |
-
latitude : 23.92615,23.92615,23.92615,23.92615
Longitude : 87.83320333333334,87.83320333333334,87.83320333333334,87.83320333333334
file name : Image_08092021145848680.png
|
2021-09-08 14:58:48.769475 |
149 |
39092057 |
CONST OF N PCC DN WITH C AND S PIT F SAHA H TO J SK HOUSE AT BATNAGAR TIED NINE |
150000 |
CONST OF N PCC DN WITH C AND S PIT F SAHA H TO J SK HOUSE AT BATNAGAR TIED NINE1 |
Completion of work |
-
latitude : 23.930725,23.930725,23.930725
Longitude : 87.80125500000001,87.80125500000001,87.80125500000001
file name : Image_08072021170751497.png
|
2021-07-08 17:07:51.550344 |
150 |
56671712 |
CONSTRUCTION OF PCC ROAD FROM SANTOSH MONDAL HOUSE TO BINOY MONDAL HOUSE VIA R M AT DHEAK FOUR UNTIE |
350000 |
CONSTRUCTION OF PCC ROAD FROM SANTOSH MONDAL HOUSE TO BINOY MONDAL HOUSE VIA R M AT DHEAK FOUR UNTIE1 |
Plinth level |
-
latitude : 23.924153284169734,23.928501522168517
Longitude : 87.82942872494459,87.82722763717175
file name : Image_16052023123326128.png
|
2023-05-16 12:33:26.203546 |
151 |
56671712 |
CONSTRUCTION OF PCC ROAD FROM SANTOSH MONDAL HOUSE TO BINOY MONDAL HOUSE VIA R M AT DHEAK FOUR UNTIE |
350000 |
CONSTRUCTION OF PCC ROAD FROM SANTOSH MONDAL HOUSE TO BINOY MONDAL HOUSE VIA R M AT DHEAK FOUR UNTIE1 |
Completion of work |
-
latitude : 23.9284652704373,23.928470090031624
Longitude : 87.82761798240244,87.82758411951363
file name : Image_04052023092928287.png
|
2023-05-04 09:29:28.366668 |
152 |
56756670 |
CONST OF PCC D W C AND S PIT F S DAS H TO A M H AND D RAJ TALA TO FULBAGAN AT NIST SANITATION ELEVEN |
200000 |
CONST OF PCC D W C AND S PIT F S DAS H TO A M H AND D RAJ TALA TO FULBAGAN AT NIST SANITATION ELEVEN1 |
Plinth level |
-
latitude : 23.92436052672565,23.92579194623977
Longitude : 87.82938547432423,87.7956044767052
file name : Image_17052023172134462.png
|
2023-05-17 17:21:34.537556 |
153 |
56756670 |
CONST OF PCC D W C AND S PIT F S DAS H TO A M H AND D RAJ TALA TO FULBAGAN AT NIST SANITATION ELEVEN |
200000 |
CONST OF PCC D W C AND S PIT F S DAS H TO A M H AND D RAJ TALA TO FULBAGAN AT NIST SANITATION ELEVEN1 |
Completion of work |
-
latitude : 23.92574672587216,23.925757203251123
Longitude : 87.79564898461103,87.79560020193458
file name : Image_12052023115609558.png
|
2023-05-12 11:56:09.634112 |
154 |
56752993 |
CONSTRUCTION OF BATHING GHAT WITH GUARD WALL IN BENEPUKUR AT CHUATARI SANITATION THREE |
200000 |
CONSTRUCTION OF BATHING GHAT WITH GUARD WALL IN BENEPUKUR AT CHUATARI SANITATION THREE1 |
Completion of work |
-
latitude : 23.927744845859706
Longitude : 87.8055719844997
file name : Image_26062023113653959.png
|
2023-06-26 11:36:54.049383 |
155 |
56673078 |
CONSTRUCTION OF PCC ROAD MAIN ROAD TO MORTAL PUKUR PAR VIA CANEL VIA G H M HO TO KN M FIVE FIVE UNTI |
200000 |
CONSTRUCTION OF PCC ROAD MAIN ROAD TO MORTAL PUKUR PAR VIA CANEL VIA G H M HO TO KN M FIVE FIVE UNTI1 |
Roof laid |
-
latitude : 23.929473110474646,23.92947629559785
Longitude : 87.84001079387963,87.83998816274107
file name : Image_09062023121238621.png
|
2023-06-09 12:12:38.688552 |
156 |
56673078 |
CONSTRUCTION OF PCC ROAD MAIN ROAD TO MORTAL PUKUR PAR VIA CANEL VIA G H M HO TO KN M FIVE FIVE UNTI |
200000 |
CONSTRUCTION OF PCC ROAD MAIN ROAD TO MORTAL PUKUR PAR VIA CANEL VIA G H M HO TO KN M FIVE FIVE UNTI1 |
Plinth level |
-
latitude : 23.92950697336346,23.92951757647097
Longitude : 87.84045847132802,87.83995253965259
file name : Image_01062023123603801.png
|
2023-06-01 12:36:03.913679 |
157 |
56673078 |
CONSTRUCTION OF PCC ROAD MAIN ROAD TO MORTAL PUKUR PAR VIA CANEL VIA G H M HO TO KN M FIVE FIVE UNTI |
200000 |
CONSTRUCTION OF PCC ROAD MAIN ROAD TO MORTAL PUKUR PAR VIA CANEL VIA G H M HO TO KN M FIVE FIVE UNTI1 |
Completion of work |
-
latitude : 23.9233553,23.9233553,23.929456220939755,23.929455005563796
Longitude : 87.8302609,87.8302609,87.83996678888798,87.83996955491602
file name : Image_30052023140033759.png
|
2023-05-30 14:00:33.83861 |
158 |
56755228 |
CONST OF PCC D W C AND CULVERT F J GARAI HOUSE TO KATAR AT KULIARA SANITATION SEVEN |
200000 |
CONST OF PCC D W C AND CULVERT F J GARAI HOUSE TO KATAR AT KULIARA SANITATION SEVEN1 |
Plinth level |
-
latitude : 23.927780175581574,23.927848362363875
Longitude : 87.83290755003691,87.83292800188065
file name : Image_02062023124034746.png
|
2023-06-02 12:40:34.817996 |
159 |
56755228 |
CONST OF PCC D W C AND CULVERT F J GARAI HOUSE TO KATAR AT KULIARA SANITATION SEVEN |
200000 |
CONST OF PCC D W C AND CULVERT F J GARAI HOUSE TO KATAR AT KULIARA SANITATION SEVEN1 |
Completion of work |
-
latitude : 23.927713707089424,23.92774580977857,23.92774580977857
Longitude : 87.83288810402155,87.83294996246696,87.83294996246696
file name : Image_04052023085728308.png
|
2023-05-04 08:57:28.383418 |
160 |
56675690 |
CONSTRUCTION OF PCC ROAD FROM GG LAND TO A MONDAL HOUSE AT GHUSKARA NINE UNTIED |
200000 |
CONSTRUCTION OF PCC ROAD FROM GG LAND TO A MONDAL HOUSE AT GHUSKARA NINE UNTIED1 |
Plinth level |
-
latitude : 23.947310680523515,23.947345884516835
Longitude : 87.8556453064084,87.85570833832026
file name : Image_06112023133410980.png
|
2023-11-06 13:34:11.049 |
161 |
56675690 |
CONSTRUCTION OF PCC ROAD FROM GG LAND TO A MONDAL HOUSE AT GHUSKARA NINE UNTIED |
200000 |
CONSTRUCTION OF PCC ROAD FROM GG LAND TO A MONDAL HOUSE AT GHUSKARA NINE UNTIED1 |
Completion of work |
-
latitude : 23.947350913658738,23.94759512040764
Longitude : 87.85574094392359,87.85582736134529
file name : Image_06062023151208459.png
|
2023-06-06 15:12:08.542418 |
162 |
56747316 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE HARIFELA AKHARA AT D BHAGABATIPUR MOUZA WATER SIX |
250000 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE HARIFELA AKHARA AT D BHAGABATIPUR MOUZA WATER SIX1 |
Roof laid |
-
latitude : 23.914315779693425
Longitude : 87.83626483753324
file name : Image_24072023124918492.png
|
2023-07-24 12:49:18.587473 |
163 |
56747316 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE HARIFELA AKHARA AT D BHAGABATIPUR MOUZA WATER SIX |
250000 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE HARIFELA AKHARA AT D BHAGABATIPUR MOUZA WATER SIX1 |
Plinth level |
-
latitude : 23.914364059455693
Longitude : 87.8362042363733
file name : Image_24072023124115510.png
|
2023-07-24 12:41:15.618872 |
164 |
56747316 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE HARIFELA AKHARA AT D BHAGABATIPUR MOUZA WATER SIX |
250000 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE HARIFELA AKHARA AT D BHAGABATIPUR MOUZA WATER SIX1 |
Completion of work |
-
latitude : 23.914349642582238
Longitude : 87.83623072318733
file name : Image_24072023123345636.png
|
2023-07-24 12:33:45.716754 |
165 |
56763945 |
CONST OF PCC D W C AND S PIT FROM SASTITALA TO GRAM PUKUR AT RASUNPUR SANITATION FOURTEEN |
200000 |
CONST OF PCC D W C AND S PIT FROM SASTITALA TO GRAM PUKUR AT RASUNPUR SANITATION FOURTEEN1 |
Roof laid |
-
latitude : 23.92296908888966,23.911838214844465
Longitude : 87.82828476279974,87.83114911057055
file name : Image_24072023122715799.png
|
2023-07-24 12:27:15.889144 |
166 |
56763945 |
CONST OF PCC D W C AND S PIT FROM SASTITALA TO GRAM PUKUR AT RASUNPUR SANITATION FOURTEEN |
200000 |
CONST OF PCC D W C AND S PIT FROM SASTITALA TO GRAM PUKUR AT RASUNPUR SANITATION FOURTEEN1 |
Plinth level |
-
latitude : 23.91175066586584,23.911481355316937
Longitude : 87.83115305006504,87.83110870979726
file name : Image_22062023121728483.png
|
2023-06-22 12:17:28.576088 |
167 |
56763945 |
CONST OF PCC D W C AND S PIT FROM SASTITALA TO GRAM PUKUR AT RASUNPUR SANITATION FOURTEEN |
200000 |
CONST OF PCC D W C AND S PIT FROM SASTITALA TO GRAM PUKUR AT RASUNPUR SANITATION FOURTEEN1 |
Completion of work |
-
latitude : 23.91191930975765,23.911879076622427
Longitude : 87.83130652271211,87.83118892461061
file name : Image_19062023115404792.png
|
2023-06-19 11:54:04.882849 |
168 |
56670360 |
CONSTRUCTION OF CULTURAL STAGE AT GIDHILA VILLAGE TWO UNTIED |
200000 |
CONSTRUCTION OF CULTURAL STAGE AT GIDHILA VILLAGE TWO UNTIED1 |
Roof laid |
-
latitude : 23.944764803163707
Longitude : 87.83673975616693
file name : Image_25072023163132760.png
|
2023-07-25 16:31:32.83223 |
169 |
56670360 |
CONSTRUCTION OF CULTURAL STAGE AT GIDHILA VILLAGE TWO UNTIED |
200000 |
CONSTRUCTION OF CULTURAL STAGE AT GIDHILA VILLAGE TWO UNTIED1 |
Plinth level |
-
latitude : 23.94463911652565
Longitude : 87.83683539368212
file name : Image_19062023115410398.png
|
2023-06-19 11:54:10.492606 |
170 |
56670360 |
CONSTRUCTION OF CULTURAL STAGE AT GIDHILA VILLAGE TWO UNTIED |
200000 |
CONSTRUCTION OF CULTURAL STAGE AT GIDHILA VILLAGE TWO UNTIED1 |
Completion of work |
-
latitude : 23.944706423208117
Longitude : 87.83677286468446
file name : Image_01062023115044992.png
|
2023-06-01 11:50:45.088437 |
171 |
56691913 |
CONSTRACTION OF PCC ROAD FROM BIJAY MONDAL HOUSE TO ARU DAS HOUSE AT HARIFALA EIGHTEEN UNTIED |
100000 |
CONSTRACTION OF PCC ROAD FROM BIJAY MONDAL HOUSE TO ARU DAS HOUSE AT HARIFALA EIGHTEEN UNTIED1 |
Roof laid |
-
latitude : 23.913717563264072,23.9137274120003
Longitude : 87.8374942112714,87.83755707554519
file name : Image_10082023125923000.png
|
2023-08-10 12:59:23.078209 |
172 |
56691913 |
CONSTRACTION OF PCC ROAD FROM BIJAY MONDAL HOUSE TO ARU DAS HOUSE AT HARIFALA EIGHTEEN UNTIED |
100000 |
CONSTRACTION OF PCC ROAD FROM BIJAY MONDAL HOUSE TO ARU DAS HOUSE AT HARIFALA EIGHTEEN UNTIED1 |
Plinth level |
-
latitude : 23.9243518,23.9243518,23.9243518
Longitude : 87.8292027,87.8292027,87.8292027
file name : Image_01082023112135764.png
|
2023-08-01 11:21:35.844034 |
173 |
56691913 |
CONSTRACTION OF PCC ROAD FROM BIJAY MONDAL HOUSE TO ARU DAS HOUSE AT HARIFALA EIGHTEEN UNTIED |
100000 |
CONSTRACTION OF PCC ROAD FROM BIJAY MONDAL HOUSE TO ARU DAS HOUSE AT HARIFALA EIGHTEEN UNTIED1 |
Completion of work |
-
latitude : 23.914316282607615,23.914229488000274,23.913729172199965
Longitude : 87.83623147755861,87.83673045225441,87.83745699562132
file name : Image_01062023141431411.png
|
2023-06-01 14:14:31.51553 |
174 |
56684661 |
CONSTRUCTION OF PCC ROAD FROM JAYDEV HAZRA HOUSE TO SANTI HOUSE AT BABAGRAM VIA PARTH SIXTEEN UNTIED |
200000 |
CONSTRUCTION OF PCC ROAD FROM JAYDEV HAZRA HOUSE TO SANTI HOUSE AT BABAGRAM VIA PARTH SIXTEEN UNTIED1 |
Roof laid |
-
latitude : 23.916384391486645
Longitude : 87.8215781506151
file name : Image_10082023125929601.png
|
2023-08-10 12:59:29.678905 |
175 |
56684661 |
CONSTRUCTION OF PCC ROAD FROM JAYDEV HAZRA HOUSE TO SANTI HOUSE AT BABAGRAM VIA PARTH SIXTEEN UNTIED |
200000 |
CONSTRUCTION OF PCC ROAD FROM JAYDEV HAZRA HOUSE TO SANTI HOUSE AT BABAGRAM VIA PARTH SIXTEEN UNTIED1 |
Plinth level |
-
latitude : 23.9243513
Longitude : 87.8292836
file name : Image_04082023173659835.png
|
2023-08-04 17:36:59.918312 |
176 |
56684661 |
CONSTRUCTION OF PCC ROAD FROM JAYDEV HAZRA HOUSE TO SANTI HOUSE AT BABAGRAM VIA PARTH SIXTEEN UNTIED |
200000 |
CONSTRUCTION OF PCC ROAD FROM JAYDEV HAZRA HOUSE TO SANTI HOUSE AT BABAGRAM VIA PARTH SIXTEEN UNTIED1 |
Completion of work |
-
latitude : 23.915091608650982
Longitude : 87.8186424728483
file name : Image_04052023103211275.png
|
2023-05-04 10:32:11.357593 |
177 |
56669738 |
CONSTRUCTION OF PCC ROAD FROM BILLOCHARAN LAND TO DEBANSHI LAND AT BELERA ONE UNTIED |
200000 |
CONSTRUCTION OF PCC ROAD FROM BILLOCHARAN LAND TO DEBANSHI LAND AT BELERA ONE UNTIED1 |
Plinth level |
-
latitude : 23.925626236014068,23.925617854110897
Longitude : 87.84559473395348,87.84556975588202
file name : Image_19092023134632096.png
|
2023-09-19 13:46:32.177868 |
178 |
56669738 |
CONSTRUCTION OF PCC ROAD FROM BILLOCHARAN LAND TO DEBANSHI LAND AT BELERA ONE UNTIED |
200000 |
CONSTRUCTION OF PCC ROAD FROM BILLOCHARAN LAND TO DEBANSHI LAND AT BELERA ONE UNTIED1 |
Completion of work |
-
latitude : 23.92673335969448,23.92670138273388
Longitude : 87.83488760702312,87.83484376966953
file name : Image_27072023145715647.png
|
2023-07-27 14:57:15.732958 |
179 |
56754905 |
CONST OF PCC D W C AND CULVERT F S MONDAL H TO NIMTALA THAKUR BARI AT GHUSKARA SANITATION SIX |
150000 |
CONST OF PCC D W C AND CULVERT F S MONDAL H TO NIMTALA THAKUR BARI AT GHUSKARA SANITATION SIX1 |
Plinth level |
-
latitude : 23.94727845210582,23.94729940686375
Longitude : 87.85703678615391,87.85710912197828
file name : Image_06112023133302248.png
|
2023-11-06 13:33:02.316699 |
180 |
56754905 |
CONST OF PCC D W C AND CULVERT F S MONDAL H TO NIMTALA THAKUR BARI AT GHUSKARA SANITATION SIX |
150000 |
CONST OF PCC D W C AND CULVERT F S MONDAL H TO NIMTALA THAKUR BARI AT GHUSKARA SANITATION SIX1 |
Completion of work |
-
latitude : 23.947447640821338,23.947424716316164
Longitude : 87.85705086775124,87.8570301644504
file name : Image_30102023124602470.png
|
2023-10-30 12:46:02.839743 |
181 |
56748288 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE NEAR MAJIBAR SEIKH HOUSE AT DOGACHI WATER EIGHT |
250000 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE NEAR MAJIBAR SEIKH HOUSE AT DOGACHI WATER EIGHT1 |
Roof laid |
-
latitude : 23.92786986194551
Longitude : 87.78642998076975
file name : Image_04012024123421984.png
|
2024-01-04 12:34:22.055314 |
182 |
56748288 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE NEAR MAJIBAR SEIKH HOUSE AT DOGACHI WATER EIGHT |
250000 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE NEAR MAJIBAR SEIKH HOUSE AT DOGACHI WATER EIGHT1 |
Plinth level |
-
latitude : 23.92808272037655
Longitude : 87.78647725470364
file name : Image_29122023124834182.png
|
2023-12-29 12:48:34.2473 |
183 |
56748288 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE NEAR MAJIBAR SEIKH HOUSE AT DOGACHI WATER EIGHT |
250000 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE NEAR MAJIBAR SEIKH HOUSE AT DOGACHI WATER EIGHT1 |
Completion of work |
-
latitude : 23.927941150031984
Longitude : 87.78657188639045
file name : Image_23122023122201210.png
|
2023-12-23 12:22:01.281245 |
184 |
56747972 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE NEAR DURGA MANDIR AT RASUNPUR WATER SEVEN |
250000 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE NEAR DURGA MANDIR AT RASUNPUR WATER SEVEN1 |
Plinth level |
-
latitude : 23.951180982403457
Longitude : 87.83727653324604
file name : Image_06112023133341550.png
|
2023-11-06 13:33:41.730821 |
185 |
56747972 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE NEAR DURGA MANDIR AT RASUNPUR WATER SEVEN |
250000 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE NEAR DURGA MANDIR AT RASUNPUR WATER SEVEN1 |
Completion of work |
-
latitude : 23.95119179505855
Longitude : 87.8371472004801
file name : Image_30102023122936289.png
|
2023-10-30 12:29:36.457265 |
186 |
72005163 |
Construction of Sheds |
285000 |
Construction of Sheds1 |
Roof laid |
-
latitude : 23.931388081982732
Longitude : 87.79523089528084
file name : Image_05072024094857773.png
|
2024-07-05 09:48:57.219724 |
187 |
72005163 |
Construction of Sheds |
285000 |
Construction of Sheds1 |
Plinth level |
-
latitude : 23.931508823297918
Longitude : 87.79527146369219
file name : Image_30052024123441258.png
|
2024-05-30 12:34:41.337046 |
188 |
72005163 |
Construction of Sheds |
285000 |
Construction of Sheds1 |
Completion of work |
-
latitude : 23.932786
Longitude : 87.7906891
file name : Image_22042024114050205.png
|
2024-04-22 11:40:50.285439 |
189 |
72007699 |
Construction of Sheds |
285000 |
Construction of Sheds1 |
Roof laid |
-
latitude : 23.923557833768427
Longitude : 87.82733182422817
file name : Image_29082024095131719.png
|
2024-08-29 09:51:32.463814 |
190 |
72007699 |
Construction of Sheds |
285000 |
Construction of Sheds1 |
Plinth level |
-
latitude : 23.923700535669923
Longitude : 87.8273628372699
file name : Image_30052024123437832.png
|
2024-05-30 12:34:37.91232 |
191 |
72007699 |
Construction of Sheds |
285000 |
Construction of Sheds1 |
Completion of work |
-
latitude : 23.9315431
Longitude : 87.79939
file name : Image_22042024114053821.png
|
2024-04-22 11:40:53.899984 |
192 |
71786016 |
Construction of roads |
250000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.931354847736657,23.930161725729704
Longitude : 87.83152076415718,87.8317615762353
file name : Image_06022024111743285.png
|
2024-02-06 11:17:43.354315 |
193 |
71786016 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.9263552,23.926016
Longitude : 87.8297144,87.8305755
file name : Image_29012024112406012.png
|
2024-01-29 11:24:06.086818 |
194 |
72052992 |
Installation of Street Lights |
1000000 |
Installation of Street Lights1 |
Roof laid |
-
latitude : 23.923419825732708
Longitude : 87.82849255017936
file name : Image_20022024153514467.png
|
2024-02-20 15:35:14.549053 |
195 |
72052992 |
Installation of Street Lights |
1000000 |
Installation of Street Lights1 |
Plinth level |
-
latitude : 23.9243692
Longitude : 87.8289692
file name : Image_20022024145416476.png
|
2024-02-20 14:54:16.543596 |
196 |
72052992 |
Installation of Street Lights |
1000000 |
Installation of Street Lights1 |
Completion of work |
-
latitude : 23.9262841
Longitude : 87.8296396
file name : Image_19022024194715417.png
|
2024-02-19 19:47:15.484371 |
197 |
71780867 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.930494864471257,23.930518669076264
Longitude : 87.83180155791342,87.83185042440891
file name : Image_04012024114848197.png
|
2024-01-04 11:48:48.26387 |
198 |
71780867 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.930249526165426,23.930302374064922
Longitude : 87.83178890123963,87.83199325203896
file name : Image_26122023123702911.png
|
2023-12-26 12:37:02.582575 |
199 |
71780867 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.9264842,23.9264842,23.9264842
Longitude : 87.8298122,87.8298122,87.8298122
file name : Image_21122023123706685.png
|
2023-12-21 12:37:06.768434 |
200 |
68050117 |
Drainage Construction |
280000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.9260297
Longitude : 87.8305745
file name : Image_27012024105429332.png
|
2024-01-27 10:54:29.406004 |
201 |
68050117 |
Drainage Construction |
280000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.9260345
Longitude : 87.830579
file name : Image_04012024114826298.png
|
2024-01-04 11:48:26.366314 |
202 |
68050117 |
Drainage Construction |
280000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.9259257
Longitude : 87.8306082
file name : Image_02012024114055890.png
|
2024-01-02 11:40:55.969654 |
203 |
68050448 |
Drainage Construction |
280000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.92851799260825
Longitude : 87.78598884120584
file name : Image_06022024130531629.png
|
2024-02-06 13:05:31.703689 |
204 |
68050448 |
Drainage Construction |
280000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.929996895603836
Longitude : 87.83174238167703
file name : Image_06022024112758406.png
|
2024-02-06 11:27:58.475813 |
205 |
68050448 |
Drainage Construction |
280000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.9243963
Longitude : 87.8292347
file name : Image_24012024150926821.png
|
2024-01-24 15:09:26.895678 |
206 |
68050448 |
Drainage Construction |
280000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.927917387336493
Longitude : 87.7866275422275
file name : Image_29122023124846100.png
|
2023-12-29 12:48:46.170105 |
207 |
68050718 |
Drainage Construction |
280000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.91964470036328
Longitude : 87.86347014829516
file name : Image_30052024123449270.png
|
2024-05-30 12:34:49.342548 |
208 |
68050718 |
Drainage Construction |
280000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.919694279320538
Longitude : 87.8633890952915
file name : Image_02042024125450192.png
|
2024-04-02 12:54:50.265734 |
209 |
68050718 |
Drainage Construction |
280000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.925710264593363
Longitude : 87.85995033569634
file name : Image_29122023124903399.png
|
2023-12-29 12:49:03.474499 |
210 |
68051531 |
Construction of toilets in public institutions |
180000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.930770377628505
Longitude : 87.79961949214339
file name : Image_14082024150007587.png
|
2024-08-14 15:00:07.658307 |
211 |
68051531 |
Construction of toilets in public institutions |
180000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.930733161978424
Longitude : 87.7995722182095
file name : Image_07032024170645472.png
|
2024-03-07 17:06:45.547285 |
212 |
71784469 |
Construction of Ghats |
200000 |
Construction of Ghats1 |
Roof laid |
-
latitude : 23.945320481434464
Longitude : 87.84064672887325
file name : Image_24072024120108157.png
|
2024-07-24 12:01:08.297927 |
213 |
71784469 |
Construction of Ghats |
200000 |
Construction of Ghats1 |
Plinth level |
-
latitude : 23.94530493300408
Longitude : 87.84067749045789
file name : Image_18072024120410592.png
|
2024-07-18 12:04:10.66832 |
214 |
71784469 |
Construction of Ghats |
200000 |
Construction of Ghats1 |
Completion of work |
-
latitude : 23.946215040050447
Longitude : 87.84012319520116
file name : Image_22042024114058591.png
|
2024-04-22 11:40:58.669809 |
215 |
68048614 |
Drainage Construction |
280000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.9262539986521
Longitude : 87.83097300678492
file name : Image_29082024120055386.png
|
2024-08-29 12:00:55.474145 |
216 |
68048614 |
Drainage Construction |
280000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.92621078994125
Longitude : 87.8309792932123
file name : Image_28082024125722338.png
|
2024-08-28 12:57:23.224601 |
217 |
68048614 |
Drainage Construction |
280000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.925898
Longitude : 87.8306315
file name : Image_04072024105425471.png
|
2024-07-04 10:54:25.555036 |
218 |
68080352 |
Operation and Maintenance of drinking water supply system |
762310 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 23.9243029
Longitude : 87.8291956
file name : Image_24092024172226376.png
|
2024-09-24 17:22:26.472757 |
219 |
68080352 |
Operation and Maintenance of drinking water supply system |
762310 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.924368950538337
Longitude : 87.8294557146728
file name : Image_24092024171809285.png
|
2024-09-24 17:18:09.346457 |
220 |
68080352 |
Operation and Maintenance of drinking water supply system |
762310 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.9243727
Longitude : 87.8293037
file name : Image_24092024171306888.png
|
2024-09-24 17:13:06.960823 |
221 |
56746690 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE NEAR DHARMARAJ TALA AT BAND VILLAGE WATER FIVE |
250000 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE NEAR DHARMARAJ TALA AT BAND VILLAGE WATER FIVE1 |
Plinth level |
-
latitude : 23.949391236528754
Longitude : 87.82374068163335
file name : Image_28092024130147711.png
|
2024-09-28 13:01:47.828953 |
222 |
56746690 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE NEAR DHARMARAJ TALA AT BAND VILLAGE WATER FIVE |
250000 |
SOLAR SUBMERSIBLE PUMP WITH PIPE LINE NEAR DHARMARAJ TALA AT BAND VILLAGE WATER FIVE1 |
Completion of work |
-
latitude : 23.94947241526097
Longitude : 87.82375727780163
file name : Image_28092024123013442.png
|
2024-09-28 12:30:13.513244 |
223 |
98360508 |
Installation of Solar lights |
120000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.929873765446246
Longitude : 87.82127313315868
file name : Image_01102024170532283.png
|
2024-10-01 17:05:32.363451 |
224 |
98360508 |
Installation of Solar lights |
120000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.929996769875288
Longitude : 87.82147253863513
file name : Image_27092024173032545.png
|
2024-09-27 17:30:32.642616 |
225 |
68049791 |
Drainage Construction |
280000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.923738128505647
Longitude : 87.84422337077558
file name : Image_20022024151724504.png
|
2024-02-20 15:17:24.578128 |
226 |
68049791 |
Drainage Construction |
280000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.923806441016495
Longitude : 87.84424600191414
file name : Image_24012024143303269.png
|
2024-01-24 14:33:03.3591 |
227 |
68049791 |
Drainage Construction |
280000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.923651669174433
Longitude : 87.84428204409778
file name : Image_29122023124914358.png
|
2023-12-29 12:49:14.439289 |
228 |
68049050 |
Drainage Construction |
280000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.923415592871606
Longitude : 87.82814763486385
file name : Image_28032024125000901.png
|
2024-03-28 12:50:00.97524 |
229 |
68049050 |
Drainage Construction |
280000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.9243809
Longitude : 87.8292097
file name : Image_27022024130404101.png
|
2024-02-27 13:04:04.174591 |
230 |
68049050 |
Drainage Construction |
280000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.92384654842317
Longitude : 87.82827017828822
file name : Image_22022024174114830.png
|
2024-02-22 17:41:14.902667 |
231 |
98350003 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.9322004,23.9321966
Longitude : 87.7980332,87.7980576
file name : Image_19112024120634439.png
|
2024-11-19 12:06:34.507227 |
232 |
98350003 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.9312686,23.9321956
Longitude : 87.7983832,87.7980583
file name : Image_11112024155617995.png
|
2024-11-11 15:56:18.061262 |
233 |
68265883 |
Construction of Building |
195000 |
Construction of Building1 |
Roof laid |
-
latitude : 23.930519800633192
Longitude : 87.82175987027586
file name : Image_30082024155204870.png
|
2024-08-30 15:52:05.633964 |
234 |
68265883 |
Construction of Building |
195000 |
Construction of Building1 |
Plinth level |
-
latitude : 23.93056171014905
Longitude : 87.82174285501242
file name : Image_30082024150350017.png
|
2024-08-30 15:03:50.117868 |
235 |
68265883 |
Construction of Building |
195000 |
Construction of Building1 |
Completion of work |
-
latitude : 23.930366369895637
Longitude : 87.82177202403545
file name : Image_22082024141217804.png
|
2024-08-22 14:12:17.912801 |
236 |
68080465 |
Operation and Maintenance of drinking water supply system |
315000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 23.944985666312277
Longitude : 87.8367415163666
file name : Image_26082024181516221.png
|
2024-08-26 18:15:16.295599 |
237 |
68080465 |
Operation and Maintenance of drinking water supply system |
315000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.944939565844834
Longitude : 87.83676045946777
file name : Image_22082024201044328.png
|
2024-08-22 20:10:44.402212 |
238 |
68080465 |
Operation and Maintenance of drinking water supply system |
315000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.944880766794086
Longitude : 87.83683581277728
file name : Image_22082024120252435.png
|
2024-08-22 12:02:52.506155 |
239 |
68104013 |
Operation and Maintenance of drinking water supply system |
315000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 23.92286993097514
Longitude : 87.82613438554108
file name : Image_26082024181359779.png
|
2024-08-26 18:13:59.857684 |
240 |
68104013 |
Operation and Maintenance of drinking water supply system |
315000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.927717
Longitude : 87.8176529
file name : Image_22082024141145750.png
|
2024-08-22 14:11:45.838365 |
241 |
68104013 |
Operation and Maintenance of drinking water supply system |
315000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.922944152727723
Longitude : 87.82606380991638
file name : Image_22082024120245909.png
|
2024-08-22 12:02:45.98712 |
242 |
68103707 |
Operation and Maintenance of drinking water supply system |
315000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 23.925583949312568
Longitude : 87.81693683937192
file name : Image_26082024181425146.png
|
2024-08-26 18:14:25.210115 |
243 |
68103707 |
Operation and Maintenance of drinking water supply system |
315000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.9277178
Longitude : 87.8176583
file name : Image_22082024141124138.png
|
2024-08-22 14:11:24.221322 |
244 |
68103707 |
Operation and Maintenance of drinking water supply system |
315000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.9277169
Longitude : 87.8176565
file name : Image_22082024120236543.png
|
2024-08-22 12:02:36.615576 |
245 |
68103366 |
Operation and Maintenance of drinking water supply system |
315000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 23.931662463583052
Longitude : 87.79881684109569
file name : Image_26082024181502770.png
|
2024-08-26 18:15:02.83913 |
246 |
68103366 |
Operation and Maintenance of drinking water supply system |
315000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.931564479134977
Longitude : 87.79885397292674
file name : Image_22082024201008621.png
|
2024-08-22 20:10:08.6922 |
247 |
68103366 |
Operation and Maintenance of drinking water supply system |
315000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.931638239882886
Longitude : 87.79880376532674
file name : Image_22082024120226883.png
|
2024-08-22 12:02:26.95382 |