1 |
34984982 |
Construction of PCC road from Sisir Mondal house towards Kashinath Mondal house at Hatin |
99700 |
Construction of PCC road from Sisir Mondal house towards Kashinath Mondal house at Hatin1 |
Completion of work |
-
latitude : 23.955616098828614,23.955616098828614,23.955616098828614
Longitude : 87.7487993426621,87.7487993426621,87.7487993426621
file name : Image_21012021135226739.png
|
2021-01-21 13:52:26.840889 |
2 |
34797878 |
Construction of PCC road from Taraknath Mondal house towards Manasa Mandir at Mohanpur |
199220 |
Construction of PCC road from Taraknath Mondal house towards Manasa Mandir at Mohanpur1 |
Completion of work |
-
latitude : 23.9577781,23.9577781
Longitude : 87.7427893,87.7427893
file name : Image_20012021125159800.png
|
2021-01-20 12:51:59.875437 |
3 |
34985067 |
Construction of PCC road from Dilip Garai house towards Bhagirath Mondal house at Pukurpara |
199360 |
Construction of PCC road from Dilip Garai house towards Bhagirath Mondal house at Pukurpara1 |
Completion of work |
-
latitude : 23.9577781,23.9577781
Longitude : 87.7427893,87.7427893
file name : Image_20012021125156735.png
|
2021-01-20 12:51:56.807321 |
4 |
34983504 |
Construction of PCC road from Dilip Das house towards towards Uttam Mondal house |
224325 |
Construction of PCC road from Dilip Das house towards towards Uttam Mondal house1 |
Completion of work |
-
latitude : 23.957433379255235,23.957433379255235
Longitude : 87.7451247163117,87.7451247163117
file name : Image_20012021125153761.png
|
2021-01-20 12:51:53.83121 |
5 |
34984199 |
Construction of PCC road from Kanta Das house towards Nimu Bhalla house at Kotasur |
149220 |
Construction of PCC road from Kanta Das house towards Nimu Bhalla house at Kotasur1 |
Completion of work |
-
latitude : 23.9575868,23.9575868
Longitude : 87.7420782,87.7420782
file name : Image_21012021135219943.png
|
2021-01-21 13:52:20.053059 |
6 |
34994430 |
Construction of PCC road from Tutul Dutta house towards Ramkrishna Ghosh |
198860 |
Construction of PCC road from Tutul Dutta house towards Ramkrishna Ghosh 1 |
Completion of work |
-
latitude : 23.95743920467794,23.9580677
Longitude : 87.74495858699083,87.7450008
file name : Image_15012021154145355.png
|
2021-01-15 15:41:45.439876 |
7 |
34984642 |
Construction of PCC road from Baidyanath Das house towards Pucca road at Gangarampur |
199300 |
Construction of PCC road from Baidyanath Das house towards Pucca road at Gangarampur1 |
Completion of work |
-
latitude : 23.955616098828614,23.955616098828614
Longitude : 87.7487993426621,87.7487993426621
file name : Image_21012021135223155.png
|
2021-01-21 13:52:23.251825 |
8 |
34983639 |
Construction of PCC road from Ramkrishna Mondal house towards Fagu Mistri house at Bairagipara |
149250 |
Construction of PCC road from Ramkrishna Mondal house towards Fagu Mistri house at Bairagipara1 |
Completion of work |
-
latitude : 23.9593287,23.9593287
Longitude : 87.7481037,87.7481037
file name : Image_21012021135216959.png
|
2021-01-21 13:52:17.055531 |
9 |
35195031 |
Construction of PCC road from Sadhan Das tea shop towards Buddhadeb Mondal |
99550 |
Construction of PCC road from Sadhan Das tea shop towards Buddhadeb Mondal 1 |
Completion of work |
-
latitude : 23.9577781,23.9577781,23.9577781
Longitude : 87.7427893,87.7427893,87.7427893
file name : Image_20012021125202797.png
|
2021-01-20 12:52:02.87411 |
10 |
35184504 |
Construction of Swajaldhara with Soakfit near Santosh Bagdi house at Induripara |
100000 |
Construction of Swajaldhara with Soakfit near Santosh Bagdi house at Induripara1 |
Completion of work |
-
latitude : 23.976561
Longitude : 87.7251527
file name : Image_18022021112802293.png
|
2021-02-18 11:28:02.419951 |
11 |
34790474 |
Construction of Swajaldhara near Club at Ghordaha bandhpara |
100000 |
Construction of Swajaldhara near Club at Ghordaha bandhpara1 |
Completion of work |
-
latitude : 23.976561
Longitude : 87.7251527
file name : Image_18022021112828521.png
|
2021-02-18 11:28:28.647339 |
12 |
34792989 |
Construction of Swajaldhara with pipeline from Kalitala towards Dhonarpar |
100000 |
Construction of Swajaldhara with pipeline from Kalitala towards Dhonarpar 1 |
Completion of work |
-
latitude : 23.9593803
Longitude : 87.7480871
file name : Image_21022021091907500.png
|
2021-02-21 09:19:07.608415 |
13 |
34787617 |
Construction of Swajaldhara with Soakfit near Club of Dangapara at Bahara |
100000 |
Construction of Swajaldhara with Soakfit near Club of Dangapara at Bahara1 |
Completion of work |
-
latitude : 23.949769511818886
Longitude : 87.74727165699005
file name : Image_18022021125811742.png
|
2021-02-18 12:58:11.897423 |
14 |
35194412 |
Construction of Swajaldhara at Pukurpara Bayen Para |
100000 |
Construction of Swajaldhara at Pukurpara Bayen Para1 |
Completion of work |
-
latitude : 23.955760183744133
Longitude : 87.70152767188847
file name : Image_18022021141036444.png
|
2021-02-18 14:10:36.588098 |
15 |
34783829 |
Construction of Swajaldhara with Soakfit near Gopal Mondal house at Kundola |
100000 |
Construction of Swajaldhara with Soakfit near Gopal Mondal house at Kundola1 |
Completion of work |
-
latitude : 23.9593803
Longitude : 87.7480871
file name : Image_21022021091850273.png
|
2021-02-21 09:18:50.393265 |
16 |
34792217 |
Construction of Swajaldhara with Soakfit near Hasu Badyakar house at Induripara |
100000 |
Construction of Swajaldhara with Soakfit near Hasu Badyakar house at Induripara1 |
Completion of work |
-
latitude : 23.976561
Longitude : 87.7251527
file name : Image_18022021112816322.png
|
2021-02-18 11:28:16.44794 |
17 |
34785350 |
Construction of Swajaldhara with Soakfit near Somnath Pal house |
100000 |
Construction of Swajaldhara with Soakfit near Somnath Pal house1 |
Completion of work |
-
latitude : 23.976561
Longitude : 87.7251527
file name : Image_18022021112755805.png
|
2021-02-18 11:27:55.946917 |
18 |
34782621 |
Construction of Swajaldhara with Soakfit near Sadai Mondal house at Mohanpur |
100000 |
Construction of Swajaldhara with Soakfit near Sadai Mondal house at Mohanpur1 |
Completion of work |
-
latitude : 23.9593803
Longitude : 87.7480871
file name : Image_21022021091841119.png
|
2021-02-21 09:18:41.23285 |
19 |
34784342 |
Construction of Swajaldhara with Soakfit near Dhananjay Bagdi house |
100000 |
Construction of Swajaldhara with Soakfit near Dhananjay Bagdi house1 |
Completion of work |
-
latitude : 23.973749885335565
Longitude : 87.72917982190847
file name : Image_18022021125818945.png
|
2021-02-18 12:58:19.096126 |
20 |
34786131 |
Construction of Swajaldhara with Soakfit near Lakshan gore par at Moutha |
100000 |
Construction of Swajaldhara with Soakfit near Lakshan gore par at Moutha1 |
Completion of work |
-
latitude : 23.9593803
Longitude : 87.7480871
file name : Image_21022021091923291.png
|
2021-02-21 09:19:23.411614 |
21 |
34788015 |
Construction of Swajaldhara with pipeline at Akolpur Dhibarpara |
100000 |
Construction of Swajaldhara with pipeline at Akolpur Dhibarpara1 |
Completion of work |
-
latitude : 23.9593803
Longitude : 87.7480871
file name : Image_21022021091859213.png
|
2021-02-21 09:18:59.345634 |
22 |
34790081 |
Construction of Swajaldhara near Dharmarajtala at Boipur |
150000 |
Construction of Swajaldhara near Dharmarajtala at Boipur1 |
Completion of work |
-
latitude : 23.934314749203622
Longitude : 87.75228596292436
file name : Image_18022021125815247.png
|
2021-02-18 12:58:15.395065 |
23 |
34786771 |
Construction of Swajaldhara with Soakfit near Pachagore at Kalikapur |
100000 |
Construction of Swajaldhara with Soakfit near Pachagore at Kalikapur1 |
Completion of work |
-
latitude : 23.967096372507513
Longitude : 87.74341556243598
file name : Image_18022021125808155.png
|
2021-02-18 12:58:08.308547 |
24 |
39102287 |
Construction of Open Cultural Stage at Ghordaha Football Ground |
300000 |
Construction of Open Cultural Stage at Ghordaha Football Ground1 |
Completion of work |
-
latitude : 23.9593803
Longitude : 87.7480871
file name : Image_21022021091915169.png
|
2021-02-21 09:19:15.299389 |
25 |
34994784 |
Construction of kitchen shed cum dinning space at Kundola Satyananda Boys Home |
200000 |
Construction of kitchen shed cum dinning space at Kundola Satyananda Boys Home1 |
Completion of work |
-
latitude : 23.975475844927132
Longitude : 87.70237038843334
file name : Image_09032021153423440.png
|
2021-03-09 15:34:23.587169 |
26 |
34785809 |
Sinking of new cylinder tube well with Soakfit near Mahalash Baroari Durgamandir |
50000 |
Sinking of new cylinder tube well with Soakfit near Mahalash Baroari Durgamandir1 |
Plinth level |
-
latitude : 23.97449528798461
Longitude : 87.73009395226836
file name : Image_28062021122444757.png
|
2021-06-28 12:24:44.871995 |
27 |
34785809 |
Sinking of new cylinder tube well with Soakfit near Mahalash Baroari Durgamandir |
50000 |
Sinking of new cylinder tube well with Soakfit near Mahalash Baroari Durgamandir1 |
Completion of work |
-
latitude : 23.97447504568845
Longitude : 87.73004533722997
file name : Image_28062021121559714.png
|
2021-06-28 12:15:59.822663 |
28 |
48621655 |
Internet connection in GP Office |
308461 |
Internet connection in GP Office1 |
Plinth level |
-
latitude : 23.9593393
Longitude : 87.7479923
file name : Image_18042022133021740.png
|
2022-04-18 13:30:21.860664 |
29 |
48621655 |
Internet connection in GP Office |
308461 |
Internet connection in GP Office1 |
Plinth level |
-
latitude : 23.9594019
Longitude : 87.748038
file name : Image_18062021165115253.png
|
2021-06-18 16:51:15.39135 |
30 |
48621655 |
Internet connection in GP Office |
308461 |
Internet connection in GP Office1 |
Completion of work |
-
latitude : 23.9594368
Longitude : 87.7481217
file name : Image_18062021163824583.png
|
2021-06-18 16:38:24.707138 |
31 |
48577586 |
Operation and Maintainance of Tubewell & Swajaldhara |
1208461 |
Operation and Maintainance of Tubewell & Swajaldhara1 |
Plinth level |
-
latitude : 23.9590185
Longitude : 87.7453277
file name : Image_18062021171357349.png
|
2021-06-18 17:13:57.459591 |
32 |
48577586 |
Operation and Maintainance of Tubewell & Swajaldhara |
1208461 |
Operation and Maintainance of Tubewell & Swajaldhara1 |
Completion of work |
-
latitude : 23.9590472
Longitude : 87.7452394
file name : Image_18062021170237092.png
|
2021-06-18 17:02:37.194278 |
33 |
34984849 |
Installation of gate at Nima-Bahara Primary School |
50000 |
Installation of gate at Nima-Bahara Primary School1 |
Plinth level |
-
latitude : 23.94928688183427
Longitude : 87.7468653023243
file name : Image_25062021122837772.png
|
2021-06-25 12:28:37.897707 |
34 |
34984849 |
Installation of gate at Nima-Bahara Primary School |
50000 |
Installation of gate at Nima-Bahara Primary School1 |
Completion of work |
-
latitude : 23.949275356717408
Longitude : 87.74690452963114
file name : Image_25062021120745302.png
|
2021-06-25 12:07:45.45021 |
35 |
39098387 |
Mainteinance of Office Data and Office Equipments |
378461 |
Mainteinance of Office Data and Office Equipments1 |
Plinth level |
-
latitude : 23.9594374
Longitude : 87.7481248
file name : Image_23062021160945509.png
|
2021-06-23 16:09:45.631989 |
36 |
39098387 |
Mainteinance of Office Data and Office Equipments |
378461 |
Mainteinance of Office Data and Office Equipments1 |
Completion of work |
-
latitude : 23.9594343
Longitude : 87.7481255
file name : Image_23062021160243037.png
|
2021-06-23 16:02:43.170097 |
37 |
39090800 |
Maintainance of Tubewall |
1036922 |
Maintainance of Tubewall1 |
Plinth level |
-
latitude : 23.955799201503396
Longitude : 87.74721901863813
file name : Image_28062021161800257.png
|
2021-06-28 16:18:00.366704 |
38 |
39090800 |
Maintainance of Tubewall |
1036922 |
Maintainance of Tubewall1 |
Completion of work |
-
latitude : 23.955803350545466
Longitude : 87.74723695591092
file name : Image_28062021161337635.png
|
2021-06-28 16:13:37.744883 |
39 |
34788769 |
Sinking of new cylinder tube well with Soakfit in front of Probhat Das Potato Shed at Kotasur |
50000 |
Sinking of new cylinder tube well with Soakfit in front of Probhat Das Potato Shed at Kotasur1 |
Plinth level |
-
latitude : 23.957639
Longitude : 87.7421893
file name : Image_27092021163837085.png
|
2021-09-27 16:38:37.190593 |
40 |
34788769 |
Sinking of new cylinder tube well with Soakfit in front of Probhat Das Potato Shed at Kotasur |
50000 |
Sinking of new cylinder tube well with Soakfit in front of Probhat Das Potato Shed at Kotasur1 |
Plinth level |
-
latitude : 23.9576085
Longitude : 87.7423487
file name : Image_23082021161828769.png
|
2021-08-23 16:18:28.925374 |
41 |
34788769 |
Sinking of new cylinder tube well with Soakfit in front of Probhat Das Potato Shed at Kotasur |
50000 |
Sinking of new cylinder tube well with Soakfit in front of Probhat Das Potato Shed at Kotasur1 |
Completion of work |
-
latitude : 23.957718908786774
Longitude : 87.7426010929048
file name : Image_18082021155642075.png
|
2021-08-18 15:56:42.232649 |
42 |
34788769 |
Sinking of new cylinder tube well with Soakfit in front of Probhat Das Potato Shed at Kotasur |
50000 |
Sinking of new cylinder tube well with Soakfit in front of Probhat Das Potato Shed at Kotasur1 |
Completion of work |
-
latitude : 23.9575585
Longitude : 87.7421301
file name : Image_18082021161104350.png
|
2021-08-18 16:11:04.477644 |
43 |
34792596 |
Construction of Swajaldhara with pipeline near Tapan Das house at Bhabghati |
100000 |
Construction of Swajaldhara with pipeline near Tapan Das house at Bhabghati1 |
Plinth level |
-
latitude : 23.956771502271295
Longitude : 87.71797824651003
file name : Image_28032022172609768.png
|
2022-03-28 17:26:09.880425 |
44 |
34792596 |
Construction of Swajaldhara with pipeline near Tapan Das house at Bhabghati |
100000 |
Construction of Swajaldhara with pipeline near Tapan Das house at Bhabghati1 |
Completion of work |
-
latitude : 23.956733993254602
Longitude : 87.71799869835377
file name : Image_03122021133835844.png
|
2021-12-03 13:38:35.95267 |
45 |
34993355 |
Construction of road protection wall near Shalgore Pond at Akna |
100000 |
Construction of road protection wall near Shalgore Pond at Akna1 |
Plinth level |
-
latitude : 23.955165278166533,23.955138414166868,23.955030371434987
Longitude : 87.72236131131649,87.72236944176257,87.72231009788811
file name : Image_24022022165525744.png
|
2022-02-24 16:55:25.849805 |
46 |
34993355 |
Construction of road protection wall near Shalgore Pond at Akna |
100000 |
Construction of road protection wall near Shalgore Pond at Akna1 |
Completion of work |
-
latitude : 23.95513233728707,23.95509457681328
Longitude : 87.72233566269279,87.7223610598594
file name : Image_16122021171710681.png
|
2021-12-16 17:17:10.777002 |
47 |
34783322 |
Construction of Swajaldhara with Soakfit near Dhiru Hazra house at Benegram |
100000 |
Construction of Swajaldhara with Soakfit near Dhiru Hazra house at Benegram1 |
Plinth level |
-
latitude : 23.97919321898371
Longitude : 87.70535057410598
file name : Image_24032022133017303.png
|
2022-03-24 13:30:17.442829 |
48 |
34783322 |
Construction of Swajaldhara with Soakfit near Dhiru Hazra house at Benegram |
100000 |
Construction of Swajaldhara with Soakfit near Dhiru Hazra house at Benegram1 |
Completion of work |
-
latitude : 23.97915851790458
Longitude : 87.70534018054605
file name : Image_27092021140731716.png
|
2021-09-27 14:07:31.828807 |
49 |
34784909 |
Construction of Swajaldhara with Soakfit near Jagannath Bagdi house |
100000 |
Construction of Swajaldhara with Soakfit near Jagannath Bagdi house1 |
Plinth level |
-
latitude : 23.9749693
Longitude : 87.728986
file name : Image_07102021132253943.png
|
2021-10-07 13:22:54.044028 |
50 |
34784909 |
Construction of Swajaldhara with Soakfit near Jagannath Bagdi house |
100000 |
Construction of Swajaldhara with Soakfit near Jagannath Bagdi house1 |
Completion of work |
-
latitude : 23.9594343
Longitude : 87.7481028
file name : Image_27092021140721738.png
|
2021-09-27 14:07:21.832135 |
51 |
34784909 |
Construction of Swajaldhara with Soakfit near Jagannath Bagdi house |
100000 |
Construction of Swajaldhara with Soakfit near Jagannath Bagdi house1 |
Completion of work |
-
latitude : 23.9594343
Longitude : 87.7481028
file name : Image_27092021133545742.png
|
2021-09-27 13:35:45.858146 |
52 |
34983569 |
Construction of PCC road from Jetha Hemram house towards Sasti Bagdi house |
150000 |
Construction of PCC road from Jetha Hemram house towards Sasti Bagdi house1 |
Plinth level |
-
latitude : 23.95481562707573,23.95486005116254
Longitude : 87.73647056892514,87.73653770796955
file name : Image_26112021200539501.png
|
2021-11-26 20:05:39.627092 |
53 |
34983569 |
Construction of PCC road from Jetha Hemram house towards Sasti Bagdi house |
150000 |
Construction of PCC road from Jetha Hemram house towards Sasti Bagdi house1 |
Completion of work |
-
latitude : 23.954855022020638,23.954902295954525,23.95494210999459
Longitude : 87.7364812977612,87.73669981397688,87.73706484586
file name : Image_27092021163833765.png
|
2021-09-27 16:38:33.880159 |
54 |
34982617 |
Construction of PCC road from Gopal Bhandari house towards Tanmoy Bhattacharjee house at Gumta |
100000 |
Construction of PCC road from Gopal Bhandari house towards Tanmoy Bhattacharjee house at Gumta1 |
Plinth level |
-
latitude : 23.96688879467547,23.966967877931893,23.96709729451686,23.96723743993789
Longitude : 87.69537753425539,87.69539061002433,87.69542455673218,87.69546336494386
file name : Image_04102021150555453.png
|
2021-10-04 15:05:55.582646 |
55 |
34982617 |
Construction of PCC road from Gopal Bhandari house towards Tanmoy Bhattacharjee house at Gumta |
100000 |
Construction of PCC road from Gopal Bhandari house towards Tanmoy Bhattacharjee house at Gumta1 |
Completion of work |
-
latitude : 23.96723844576627,23.967175874859095,23.96705429535359
Longitude : 87.69547442905605,87.69549479708076,87.69542656838894
file name : Image_27092021141004691.png
|
2021-09-27 14:10:04.797698 |
56 |
35196422 |
Construction of PCC road from Sushanta Pal house towards old pcc road |
50000 |
Construction of PCC road from Sushanta Pal house towards old pcc road 1 |
Plinth level |
-
latitude : 23.948766659013927,23.948803497478366,23.948891256004572,23.949049464426935
Longitude : 87.74991849437356,87.7498649340123,87.74965605698526,87.74967575445771
file name : Image_27092021163840159.png
|
2021-09-27 16:38:40.25807 |
57 |
35196422 |
Construction of PCC road from Sushanta Pal house towards old pcc road |
50000 |
Construction of PCC road from Sushanta Pal house towards old pcc road 1 |
Completion of work |
-
latitude : 23.94876452162862,23.948799264617264,23.94884968176484,23.94896178971976,23.949037101119757
Longitude : 87.74997188709676,87.74977206252515,87.74963728152215,87.74966862984002,87.74969100952148
file name : Image_20092021133118289.png
|
2021-09-20 13:31:18.394088 |
58 |
34786439 |
Construction of Swajaldhara at Battala near Adhir Hazra house at Moutha |
100000 |
Construction of Swajaldhara at Battala near Adhir Hazra house at Moutha1 |
Plinth level |
-
latitude : 23.96185567136854
Longitude : 87.74652248248458
file name : Image_07102021132249868.png
|
2021-10-07 13:22:49.968926 |
59 |
34786439 |
Construction of Swajaldhara at Battala near Adhir Hazra house at Moutha |
100000 |
Construction of Swajaldhara at Battala near Adhir Hazra house at Moutha1 |
Completion of work |
-
latitude : 23.961845696903765
Longitude : 87.74649498984218
file name : Image_27092021143519375.png
|
2021-09-27 14:35:19.488074 |
60 |
34787098 |
Construction of Swajaldhara with Soakfit near Bhola Hazra house at Kalikapur |
100000 |
Construction of Swajaldhara with Soakfit near Bhola Hazra house at Kalikapur1 |
Plinth level |
-
latitude : 23.96486963611096
Longitude : 87.74357255548239
file name : Image_15122021152743076.png
|
2021-12-15 15:27:43.178642 |
61 |
34787098 |
Construction of Swajaldhara with Soakfit near Bhola Hazra house at Kalikapur |
100000 |
Construction of Swajaldhara with Soakfit near Bhola Hazra house at Kalikapur1 |
Completion of work |
-
latitude : 23.964903205633163
Longitude : 87.74353659711778
file name : Image_27092021163847158.png
|
2021-09-27 16:38:47.269402 |
62 |
34795244 |
Construction of Swajaldhara with pipeline near Khapakali Mandir at Akna |
100000 |
Construction of Swajaldhara with pipeline near Khapakali Mandir at Akna1 |
Plinth level |
-
latitude : 23.95607739686966
Longitude : 87.72279247641563
file name : Image_05042022135702021.png
|
2022-04-05 13:57:02.146896 |
63 |
34795244 |
Construction of Swajaldhara with pipeline near Khapakali Mandir at Akna |
100000 |
Construction of Swajaldhara with pipeline near Khapakali Mandir at Akna1 |
Completion of work |
-
latitude : 23.956167460419238
Longitude : 87.72260639816523
file name : Image_08102021135958085.png
|
2021-10-08 13:59:58.190151 |
64 |
34985036 |
Construction of PCC road from Bhakti Bhusan Garai house towards Shakti pada Garai house at Beluti |
100000 |
Construction of PCC road from Bhakti Bhusan Garai house towards Shakti pada Garai house at Beluti1 |
Plinth level |
-
latitude : 23.94390197005123,23.943828963674605,23.94382364116609
Longitude : 87.75060153566301,87.75074453093112,87.75096111930907
file name : Image_28092021112054809.png
|
2021-09-28 11:20:54.904079 |
65 |
34985036 |
Construction of PCC road from Bhakti Bhusan Garai house towards Shakti pada Garai house at Beluti |
100000 |
Construction of PCC road from Bhakti Bhusan Garai house towards Shakti pada Garai house at Beluti1 |
Completion of work |
-
latitude : 23.943848283961415,23.943868316709995
Longitude : 87.7505965065211,87.75059265084565
file name : Image_20092021133108061.png
|
2021-09-20 13:31:08.160904 |
66 |
34789685 |
Construction of Swajaldhara with Soakfit near Madaneswar Temple at Kotasur |
100000 |
Construction of Swajaldhara with Soakfit near Madaneswar Temple at Kotasur1 |
Plinth level |
-
latitude : 23.956153253093362
Longitude : 87.74731658399105
file name : Image_28032022172527472.png
|
2022-03-28 17:25:27.585651 |
67 |
34789685 |
Construction of Swajaldhara with Soakfit near Madaneswar Temple at Kotasur |
100000 |
Construction of Swajaldhara with Soakfit near Madaneswar Temple at Kotasur1 |
Completion of work |
-
latitude : 23.95621427334845
Longitude : 87.74731499142945
file name : Image_27092021163843760.png
|
2021-09-27 16:38:43.870634 |
68 |
107225187 |
Creation of a new source of drinking water |
175000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.975667371414602
Longitude : 87.70813889801502
file name : Image_23092024162530318.png
|
2024-09-23 16:25:30.401467 |
69 |
107225187 |
Creation of a new source of drinking water |
175000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.975628102198243
Longitude : 87.70813839510083
file name : Image_24082024135907746.png
|
2024-08-24 13:59:07.84364 |
70 |
107225187 |
Creation of a new source of drinking water |
175000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.975652954541147
Longitude : 87.70817385055125
file name : Image_24082024135339149.png
|
2024-08-24 13:53:39.255584 |
71 |
39102263 |
Waiting Shed at Akna Bus Stand |
250000 |
Waiting Shed at Akna Bus Stand1 |
Plinth level |
-
latitude : 23.95330986008048
Longitude : 87.72162705659866
file name : Image_28032022172535885.png
|
2022-03-28 17:25:36.01239 |
72 |
39102263 |
Waiting Shed at Akna Bus Stand |
250000 |
Waiting Shed at Akna Bus Stand1 |
Plinth level |
-
latitude : 23.95329125225544
Longitude : 87.72164549678564
file name : Image_24022022165546331.png
|
2022-02-24 16:55:46.475063 |
73 |
39102263 |
Waiting Shed at Akna Bus Stand |
250000 |
Waiting Shed at Akna Bus Stand1 |
Completion of work |
-
latitude : 23.953316397964954
Longitude : 87.72162596695125
file name : Image_03122021133611240.png
|
2021-12-03 13:36:11.342837 |
74 |
48576000 |
Construction of Swajaldhara at the back side of Jagannath Mondal house at satgharia |
100000 |
Construction of Swajaldhara at the back side of Jagannath Mondal house at satgharia1 |
Plinth level |
-
latitude : 23.95593574270606,23.955976897850633
Longitude : 87.75571248494089,87.7556874230504
file name : Image_24022022170040377.png
|
2022-02-24 17:00:40.47599 |
75 |
48576000 |
Construction of Swajaldhara at the back side of Jagannath Mondal house at satgharia |
100000 |
Construction of Swajaldhara at the back side of Jagannath Mondal house at satgharia1 |
Completion of work |
-
latitude : 23.95593888591975,23.95598796196282
Longitude : 87.75573201477528,87.75567116215825
file name : Image_24022022165647798.png
|
2022-02-24 16:56:47.91574 |
76 |
34984118 |
Upgradation of kitchen shed of Kotasur AWC |
25000 |
Upgradation of kitchen shed of Kotasur AWC1 |
Plinth level |
-
latitude : 23.95390204153955
Longitude : 87.74784187786281
file name : Image_29032022142826944.png
|
2022-03-29 14:28:27.061601 |
77 |
34984118 |
Upgradation of kitchen shed of Kotasur AWC |
25000 |
Upgradation of kitchen shed of Kotasur AWC1 |
Completion of work |
-
latitude : 23.954013269394636
Longitude : 87.74782419204712
file name : Image_17022022113755462.png
|
2022-02-17 11:37:55.559955 |
78 |
48582898 |
Construction of PCC road from Sunil Bagdi house towards ramprasad Ghosh house |
75000 |
Construction of PCC road from Sunil Bagdi house towards ramprasad Ghosh house1 |
Plinth level |
-
latitude : 23.956195707432926,23.956328351050615
Longitude : 87.72475342266262,87.72474160417914
file name : Image_05042022135706467.png
|
2022-04-05 13:57:06.583409 |
79 |
48582898 |
Construction of PCC road from Sunil Bagdi house towards ramprasad Ghosh house |
75000 |
Construction of PCC road from Sunil Bagdi house towards ramprasad Ghosh house1 |
Completion of work |
-
latitude : 23.95619424059987,23.956358819268644,23.95655583590269
Longitude : 87.7246352378279,87.7246886305511,87.72472886368632
file name : Image_24022022165511855.png
|
2022-02-24 16:55:11.964437 |
80 |
48569275 |
Construction of PCC drain with cover from Kamal Sk house towards Khas pukur |
150000 |
Construction of PCC drain with cover from Kamal Sk house towards Khas pukur1 |
Completion of work |
-
latitude : 23.954783692024648,23.954841904342175
Longitude : 87.71785511635244,87.71785964258015
file name : Image_31032022135103438.png
|
2022-03-31 13:51:03.54865 |
81 |
48627130 |
Construction of PCC drain with cover from Jana Prasad Mistri house towards Ajit Mistri house at Puku |
150000 |
Construction of PCC drain with cover from Jana Prasad Mistri house towards Ajit Mistri house at Puku1 |
Completion of work |
-
latitude : 23.95526091568172,23.95529067143798
Longitude : 87.70387594588101,87.70393101498485
file name : Image_31032022135114009.png
|
2022-03-31 13:51:14.124513 |
82 |
34984788 |
Construction of PCC drain from Ganesh Chandra Pal shallow towards Dulal Chandra Mondal Land |
100000 |
Construction of PCC drain from Ganesh Chandra Pal shallow towards Dulal Chandra Mondal Land1 |
Plinth level |
-
latitude : 23.950736531987786,23.950786613859236,23.95091456361115,23.95099905319512,23.95105864852667,23.951079309917986
Longitude : 87.74258298799396,87.74251903407276,87.74239590391517,87.74228802882135,87.74228702299297,87.74230135604739
file name : Image_28032022172447477.png
|
2022-03-28 17:24:47.593302 |
83 |
34984788 |
Construction of PCC drain from Ganesh Chandra Pal shallow towards Dulal Chandra Mondal Land |
100000 |
Construction of PCC drain from Ganesh Chandra Pal shallow towards Dulal Chandra Mondal Land1 |
Completion of work |
-
latitude : 23.950711763463914,23.9528352
Longitude : 87.74255029857159,87.7429831
file name : Image_12112021135030504.png
|
2021-11-12 13:50:30.619196 |
84 |
34800153 |
Construction of PCC road from Goutam Ghosh house towards Dharmarajtala at Itahat |
100000 |
Construction of PCC road from Goutam Ghosh house towards Dharmarajtala at Itahat1 |
Plinth level |
-
latitude : 23.973131007514894,23.9731289120391,23.97310594562441
Longitude : 87.69008729606867,87.69025233574212,87.69041737541556
file name : Image_28032022172643496.png
|
2022-03-28 17:26:43.591546 |
85 |
34800153 |
Construction of PCC road from Goutam Ghosh house towards Dharmarajtala at Itahat |
100000 |
Construction of PCC road from Goutam Ghosh house towards Dharmarajtala at Itahat1 |
Completion of work |
-
latitude : 23.9730705,23.9730721,23.9730672
Longitude : 87.6904138,87.6904146,87.6904174
file name : Image_06102021123834975.png
|
2021-10-06 12:38:35.077445 |
86 |
34984495 |
Construction of PCC road from Ganesh Mudi house towards Shyam Mudi house at Mahantapara |
165000 |
Construction of PCC road from Ganesh Mudi house towards Shyam Mudi house at Mahantapara1 |
Plinth level |
-
latitude : 23.963964097201824,23.96413228008896,23.96425784099847,23.96433453541249,23.96446059923619,23.96449500694871
Longitude : 87.75951971299946,87.75958215817809,87.75961576960981,87.75952004827559,87.75938048958778,87.75922668166459
file name : Image_28032022172409455.png
|
2022-03-28 17:24:09.5671 |
87 |
34984495 |
Construction of PCC road from Ganesh Mudi house towards Shyam Mudi house at Mahantapara |
165000 |
Construction of PCC road from Ganesh Mudi house towards Shyam Mudi house at Mahantapara1 |
Completion of work |
-
latitude : 23.963956218212843,23.96394087933004
Longitude : 87.75948727503419,87.75947319343686
file name : Image_12112021135033674.png
|
2021-11-12 13:50:33.780209 |
88 |
34983198 |
Construction of Bathing ghat on the embankment of Mayurakshi river with sitting arrangement |
170000 |
Construction of Bathing ghat on the embankment of Mayurakshi river with sitting arrangement 1 |
Plinth level |
-
latitude : 23.95379165187478
Longitude : 87.70583538338542
file name : Image_31032022135110594.png
|
2022-03-31 13:51:10.693119 |
89 |
34983198 |
Construction of Bathing ghat on the embankment of Mayurakshi river with sitting arrangement |
170000 |
Construction of Bathing ghat on the embankment of Mayurakshi river with sitting arrangement 1 |
Completion of work |
-
latitude : 23.953875387087464
Longitude : 87.70584804005921
file name : Image_26112021200544420.png
|
2021-11-26 20:05:44.527486 |
90 |
34983404 |
Construction of bench for sit near Loknathmandir at Akolpur |
50000 |
Construction of bench for sit near Loknathmandir at Akolpur1 |
Plinth level |
-
latitude : 23.95299440715462
Longitude : 87.71275665611029
file name : Image_31032022135107085.png
|
2022-03-31 13:51:07.202268 |
91 |
34983404 |
Construction of bench for sit near Loknathmandir at Akolpur |
50000 |
Construction of bench for sit near Loknathmandir at Akolpur1 |
Completion of work |
-
latitude : 23.95301129668951
Longitude : 87.71270988509059
file name : Image_26112021200529419.png
|
2021-11-26 20:05:29.582643 |
92 |
34985105 |
Construction of PCC Cremation ground at Bolur |
100000 |
Construction of PCC Cremation ground at Bolur1 |
Plinth level |
-
latitude : 23.972322572954
Longitude : 87.71717442199588
file name : Image_28032022172709923.png
|
2022-03-28 17:27:10.040876 |
93 |
34985105 |
Construction of PCC Cremation ground at Bolur |
100000 |
Construction of PCC Cremation ground at Bolur1 |
Completion of work |
-
latitude : 23.972453204914927
Longitude : 87.71717769093812
file name : Image_12112021135036978.png
|
2021-11-12 13:50:37.121902 |
94 |
48622045 |
Sinking of a new tubewell at Tematha of Benegram |
50000 |
Sinking of a new tubewell at Tematha of Benegram1 |
Plinth level |
-
latitude : 23.976322878152132
Longitude : 87.70165817812085
file name : Image_28032022172659542.png
|
2022-03-28 17:26:59.648637 |
95 |
48622045 |
Sinking of a new tubewell at Tematha of Benegram |
50000 |
Sinking of a new tubewell at Tematha of Benegram1 |
Completion of work |
-
latitude : 23.976328829303384
Longitude : 87.70160738378763
file name : Image_24022022131417361.png
|
2022-02-24 13:14:17.479115 |
96 |
48622617 |
Construction of Swajaldhara in front of Kalitala at Balur Village |
100000 |
Construction of Swajaldhara in front of Kalitala at Balur Village1 |
Plinth level |
-
latitude : 23.97585852071643,23.975891210138798
Longitude : 87.71928490139544,87.71927459165454
file name : Image_28032022172720936.png
|
2022-03-28 17:27:21.037452 |
97 |
48622617 |
Construction of Swajaldhara in front of Kalitala at Balur Village |
100000 |
Construction of Swajaldhara in front of Kalitala at Balur Village1 |
Completion of work |
-
latitude : 23.975884839892387,23.975899340584874
Longitude : 87.71928858943284,87.719283727929
file name : Image_24022022131420948.png
|
2022-02-24 13:14:21.043062 |
98 |
48624515 |
Construction of Swajaldhara with pipeline infront of Golok Mondal house at Mahalash |
100000 |
Construction of Swajaldhara with pipeline infront of Golok Mondal house at Mahalash1 |
Plinth level |
-
latitude : 23.974826498888433,23.97483584471047
Longitude : 87.72878570482135,87.72879953496158
file name : Image_28032022173345758.png
|
2022-03-28 17:33:45.885897 |
99 |
48624515 |
Construction of Swajaldhara with pipeline infront of Golok Mondal house at Mahalash |
100000 |
Construction of Swajaldhara with pipeline infront of Golok Mondal house at Mahalash1 |
Completion of work |
-
latitude : 23.97485902067274,23.974817278794944
Longitude : 87.72883540950716,87.72883415222168
file name : Image_24022022131424965.png
|
2022-02-24 13:14:25.060802 |
100 |
48570438 |
Sinking of new Cylinder tubewell with soakpit in front of Manik Mondal house |
50000 |
Sinking of new Cylinder tubewell with soakpit in front of Manik Mondal house1 |
Plinth level |
-
latitude : 23.954801252111793
Longitude : 87.71088941954076
file name : Image_05042022115845606.png
|
2022-04-05 11:58:45.75478 |
101 |
48570438 |
Sinking of new Cylinder tubewell with soakpit in front of Manik Mondal house |
50000 |
Sinking of new Cylinder tubewell with soakpit in front of Manik Mondal house1 |
Completion of work |
-
latitude : 23.954853555187583
Longitude : 87.7108097076416
file name : Image_24022022165504247.png
|
2022-02-24 16:55:04.385693 |
102 |
48579477 |
Constructtion of Sajaldhara pump with water tank at Narayanghati crematorium |
100000 |
Constructtion of Sajaldhara pump with water tank at Narayanghati crematorium1 |
Plinth level |
-
latitude : 23.946873522363603,23.94688173662871
Longitude : 87.73368576541543,87.73361661471426
file name : Image_05042022135709768.png
|
2022-04-05 13:57:09.89547 |
103 |
48579477 |
Constructtion of Sajaldhara pump with water tank at Narayanghati crematorium |
100000 |
Constructtion of Sajaldhara pump with water tank at Narayanghati crematorium1 |
Completion of work |
-
latitude : 23.946829894557595,23.94687050487846
Longitude : 87.73364930413663,87.7336161956191
file name : Image_24022022165604811.png
|
2022-02-24 16:56:04.929753 |
104 |
48574217 |
Construction of Swajaldhara in front of Dompara Club at Bahara |
100000 |
Construction of Swajaldhara in front of Dompara Club at Bahara1 |
Plinth level |
-
latitude : 23.947820174507797,23.947784467600286
Longitude : 87.74814689531922,87.74814253672957
file name : Image_28032022172455623.png
|
2022-03-28 17:24:55.743688 |
105 |
48574217 |
Construction of Swajaldhara in front of Dompara Club at Bahara |
100000 |
Construction of Swajaldhara in front of Dompara Club at Bahara1 |
Completion of work |
-
latitude : 23.947805087082088,23.94780253060162
Longitude : 87.74804756976664,87.74805041961372
file name : Image_24022022131431877.png
|
2022-02-24 13:14:31.99659 |
106 |
48570670 |
Construction of PCC high drain with cover from Dinabandhu Hazra house towards Power house at Moutha |
300000 |
Construction of PCC high drain with cover from Dinabandhu Hazra house towards Power house at Moutha1 |
Plinth level |
-
latitude : 23.96299477200955,23.962977924384177
Longitude : 87.74720116518438,87.74715808220208
file name : Image_29032022142822270.png
|
2022-03-29 14:28:22.379544 |
107 |
48570670 |
Construction of PCC high drain with cover from Dinabandhu Hazra house towards Power house at Moutha |
300000 |
Construction of PCC high drain with cover from Dinabandhu Hazra house towards Power house at Moutha1 |
Completion of work |
-
latitude : 23.963038064539433,23.963348027318716
Longitude : 87.74718414992094,87.74735329672694
file name : Image_17032022163028608.png
|
2022-03-17 16:30:28.716752 |
108 |
48583395 |
Construction of PCC road from Basudeb pal house towards Parimal Pal land at itahat |
150000 |
Construction of PCC road from Basudeb pal house towards Parimal Pal land at itahat1 |
Plinth level |
-
latitude : 23.973100748844445,23.973080841824412,23.973015588708222,23.97293881047517,23.972851051948965
Longitude : 87.69042709842324,87.69054821692407,87.69070655107498,87.6907800603658,87.69081157632172
file name : Image_28032022172650780.png
|
2022-03-28 17:26:50.873916 |
109 |
48583395 |
Construction of PCC road from Basudeb pal house towards Parimal Pal land at itahat |
150000 |
Construction of PCC road from Basudeb pal house towards Parimal Pal land at itahat1 |
Completion of work |
-
latitude : 23.973130420781672,23.97308876272291,23.972946479916573
Longitude : 87.6903997734189,87.69066338427365,87.6907922141254
file name : Image_24022022131413977.png
|
2022-02-24 13:14:14.09865 |
110 |
48583672 |
Construction of PCC road from Swapan das house towards field at Nimpur |
50000 |
Construction of PCC road from Swapan das house towards field at Nimpur1 |
Plinth level |
-
latitude : 23.96031780168414,23.96035748999566,23.960398184135556,23.960444913245738
Longitude : 87.69826903939247,87.69817809574306,87.6980344299227,87.69793166778982
file name : Image_28032022172617039.png
|
2022-03-28 17:26:17.123241 |
111 |
48583672 |
Construction of PCC road from Swapan das house towards field at Nimpur |
50000 |
Construction of PCC road from Swapan das house towards field at Nimpur1 |
Completion of work |
-
latitude : 23.96031314972788,23.960351538844407,23.960383096709847
Longitude : 87.69824196584523,87.69815982319415,87.69805094227195
file name : Image_24022022131410683.png
|
2022-02-24 13:14:10.777532 |
112 |
48584206 |
Construction of PCC road from Debu Das house towards Ajoy Das house |
140000 |
Construction of PCC road from Debu Das house towards Ajoy Das house1 |
Completion of work |
-
latitude : 23.955731936730444,23.95566014572978,23.95545558538288,23.955312045291066
Longitude : 87.70138559862971,87.70135089755058,87.70126800052822,87.70123103633523
file name : Image_28022022151548437.png
|
2022-02-28 15:15:48.532044 |
113 |
48584344 |
Construction of PCC road from Bharat Das house towards Debasish Sarkar house |
150000 |
Construction of PCC road from Bharat Das house towards Debasish Sarkar house1 |
Completion of work |
-
latitude : 23.95635550841689,23.9565294329077,23.95668131299317
Longitude : 87.7024773415178,87.70221917890012,87.70198901183903
file name : Image_24022022131407480.png
|
2022-02-24 13:14:07.599833 |
114 |
48629705 |
Construction of PCC road from Manasa Tala towards Buddhadeb Chatterjee house at Gangarampur |
125000 |
Construction of PCC road from Manasa Tala towards Buddhadeb Chatterjee house at Gangarampur1 |
Plinth level |
-
latitude : 23.958563092164695,23.95862587261945,23.958567325025797,23.958557602018118
Longitude : 87.77357373386621,87.77343694120646,87.77302698232234,87.77295866981149
file name : Image_28032022172357476.png
|
2022-03-28 17:23:57.580462 |
115 |
48629705 |
Construction of PCC road from Manasa Tala towards Buddhadeb Chatterjee house at Gangarampur |
125000 |
Construction of PCC road from Manasa Tala towards Buddhadeb Chatterjee house at Gangarampur1 |
Completion of work |
-
latitude : 23.958604456856847,23.95862251985818,23.9586508506909
Longitude : 87.77355185709894,87.77338229119778,87.77332009747624
file name : Image_24022022131428305.png
|
2022-02-24 13:14:28.401115 |
116 |
48591771 |
Construction of PCC road from Swapan Mondal house towards Dharam Tala at Bahara |
150000 |
Construction of PCC road from Swapan Mondal house towards Dharam Tala at Bahara1 |
Plinth level |
-
latitude : 23.9485781500116,23.948535611853004,23.948487835004926,23.948411978781223,23.948318269103765
Longitude : 87.74908751249313,87.7492063678801,87.74935129098594,87.74950979277492,87.74976762011647
file name : Image_29032022142834587.png
|
2022-03-29 14:28:34.691108 |
117 |
48591771 |
Construction of PCC road from Swapan Mondal house towards Dharam Tala at Bahara |
150000 |
Construction of PCC road from Swapan Mondal house towards Dharam Tala at Bahara1 |
Completion of work |
-
latitude : 23.94864826463163,23.948590555228293
Longitude : 87.7490789629519,87.74927937425673
file name : Image_24022022165641550.png
|
2022-02-24 16:56:41.67036 |
118 |
48594078 |
Construction of PCC road from Apurba Bagdi house towards Tapas Mondal house at Bandoha |
250000 |
Construction of PCC road from Apurba Bagdi house towards Tapas Mondal house at Bandoha1 |
Plinth level |
-
latitude : 23.967179730534554,23.967147921212018,23.967156764119864
Longitude : 87.7341191098094,87.73405909538269,87.73395172320306
file name : Image_31032022135117779.png
|
2022-03-31 13:51:17.899529 |
119 |
48594078 |
Construction of PCC road from Apurba Bagdi house towards Tapas Mondal house at Bandoha |
250000 |
Construction of PCC road from Apurba Bagdi house towards Tapas Mondal house at Bandoha1 |
Completion of work |
-
latitude : 23.96722226869315,23.967194817960262,23.967176084406674,23.96716196089983
Longitude : 87.73421114310622,87.73408231325448,87.73395432159305,87.73389874957502
file name : Image_24022022165628709.png
|
2022-02-24 16:56:28.840986 |
120 |
48594816 |
Construction of PCC road from Balika Hemram house toawards Manasa tala and Chand Murmu house at Hati |
175000 |
Construction of PCC road from Balika Hemram house toawards Manasa tala and Chand Murmu house at Hati1 |
Plinth level |
-
latitude : 23.951937868259847,23.951872405596077,23.951698481105268,23.95153557881713,23.95143985748291
Longitude : 87.7369321603328,87.73690198548138,87.73684012703598,87.73678916506469,87.7367508597672
file name : Image_29032022142847175.png
|
2022-03-29 14:28:47.277732 |
121 |
48594816 |
Construction of PCC road from Balika Hemram house toawards Manasa tala and Chand Murmu house at Hati |
175000 |
Construction of PCC road from Balika Hemram house toawards Manasa tala and Chand Murmu house at Hati1 |
Completion of work |
-
latitude : 23.952007479965687,23.95196049939841
Longitude : 87.73695018142462,87.7370444778353
file name : Image_24022022165636027.png
|
2022-02-24 16:56:36.149068 |
122 |
48594419 |
Construction of PCC road from Swapan Pal house towards Pacha gore at Hatinagar Village |
150000 |
Construction of PCC road from Swapan Pal house towards Pacha gore at Hatinagar Village1 |
Plinth level |
-
latitude : 23.954818937927485,23.954681768082082,23.954601134173572,23.954462623223662,23.954405374825,23.954345905222
Longitude : 87.74040218442678,87.74033697322011,87.74029548279941,87.74023035541177,87.74019984528422,87.74017587304115
file name : Image_28032022172414995.png
|
2022-03-28 17:24:15.10366 |
123 |
48594419 |
Construction of PCC road from Swapan Pal house towards Pacha gore at Hatinagar Village |
150000 |
Construction of PCC road from Swapan Pal house towards Pacha gore at Hatinagar Village1 |
Completion of work |
-
latitude : 23.954865750856698,23.954333416186273
Longitude : 87.74038072675467,87.74018132127821
file name : Image_17032022163032068.png
|
2022-03-17 16:30:32.17545 |
124 |
48582544 |
Construction of Ghat at Dharam Sayer Pukur at Balur Village |
200000 |
Construction of Ghat at Dharam Sayer Pukur at Balur Village1 |
Completion of work |
-
latitude : 23.97300418931991,23.973092325031757
Longitude : 87.71164144389331,87.71161621436477
file name : Image_17032022163035505.png
|
2022-03-17 16:30:35.615239 |
125 |
48582544 |
Construction of Ghat at Dharam Sayer Pukur at Balur Village |
200000 |
Construction of Ghat at Dharam Sayer Pukur at Balur Village1 |
Completion of work |
-
latitude : 23.97300418931991,23.973092325031757
Longitude : 87.71164144389331,87.71161621436477
file name : Image_17032022163039287.png
|
2022-03-17 16:30:39.384455 |
126 |
48625034 |
Construction of PCC drain with cover from Santosh Sutradhar house towards Swajaldhara with hume pipe |
150000 |
Construction of PCC drain with cover from Santosh Sutradhar house towards Swajaldhara with hume pipe1 |
Plinth level |
-
latitude : 23.976856428198516,23.97683991584927,23.976787612773478,23.976673744618893
Longitude : 87.72386636584997,87.7237403858453,87.72371892817318,87.72371071390808
file name : Image_28032022173523802.png
|
2022-03-28 17:35:23.908936 |
127 |
48625034 |
Construction of PCC drain with cover from Santosh Sutradhar house towards Swajaldhara with hume pipe |
150000 |
Construction of PCC drain with cover from Santosh Sutradhar house towards Swajaldhara with hume pipe1 |
Completion of work |
-
latitude : 23.976885597221553,23.976853075437248
Longitude : 87.7238579839468,87.72373787127435
file name : Image_24032022133010501.png
|
2022-03-24 13:30:10.616915 |
128 |
48625453 |
Construction of PCC drain with cover from Narottom Das house towards Basu Bagdi house at Noabad |
125000 |
Construction of PCC drain with cover from Narottom Das house towards Basu Bagdi house at Noabad1 |
Plinth level |
-
latitude : 23.970871372148395,23.970944336615503
Longitude : 87.70014373585582,87.70012093707919
file name : Image_06052022111244136.png
|
2022-05-06 11:12:44.239219 |
129 |
48625453 |
Construction of PCC drain with cover from Narottom Das house towards Basu Bagdi house at Noabad |
125000 |
Construction of PCC drain with cover from Narottom Das house towards Basu Bagdi house at Noabad1 |
Completion of work |
-
latitude : 23.970891991630197,23.970920951105654
Longitude : 87.70024716854095,87.70019243471324
file name : Image_24032022133020761.png
|
2022-03-24 13:30:20.901883 |
130 |
48595695 |
Construction of Cremation shed at Kotasur village beside of Sainthia Kandi road |
350000 |
Construction of Cremation shed at Kotasur village beside of Sainthia Kandi road1 |
Plinth level |
-
latitude : 23.95827043801546
Longitude : 87.75139940902591
file name : Image_29042022161844910.png
|
2022-04-29 16:18:45.080533 |
131 |
48595695 |
Construction of Cremation shed at Kotasur village beside of Sainthia Kandi road |
350000 |
Construction of Cremation shed at Kotasur village beside of Sainthia Kandi road1 |
Completion of work |
-
latitude : 23.958299607038498
Longitude : 87.75142991915345
file name : Image_06042022120235508.png
|
2022-04-06 12:02:35.590832 |
132 |
48595916 |
Construction of Cremation shed at Hatinagar Canal par beside Sainthia Kandi road |
350000 |
Construction of Cremation shed at Hatinagar Canal par beside Sainthia Kandi road1 |
Plinth level |
-
latitude : 23.955525741912425
Longitude : 87.73738914169371
file name : Image_26042022095222271.png
|
2022-04-26 09:52:22.389729 |
133 |
48595916 |
Construction of Cremation shed at Hatinagar Canal par beside Sainthia Kandi road |
350000 |
Construction of Cremation shed at Hatinagar Canal par beside Sainthia Kandi road1 |
Completion of work |
-
latitude : 23.95556371193379
Longitude : 87.73740506730974
file name : Image_06042022151108097.png
|
2022-04-06 15:11:08.197645 |
134 |
48596860 |
Improvement of GP building with Baby feeding room |
245000 |
Improvement of GP building with Baby feeding room1 |
Completion of work |
-
latitude : 23.9593358
Longitude : 87.7480101
file name : Image_06042022151111291.png
|
2022-04-06 15:11:11.373801 |
135 |
48622167 |
Construction of Swajaldhara with pipeline near Ananda Bagdi house at Kundola |
100000 |
Construction of Swajaldhara with pipeline near Ananda Bagdi house at Kundola1 |
Plinth level |
-
latitude : 23.97400620393455,23.973962073214352
Longitude : 87.709531635046,87.70953431725502
file name : Image_07092022164837728.png
|
2022-09-07 16:48:37.841644 |
136 |
48622167 |
Construction of Swajaldhara with pipeline near Ananda Bagdi house at Kundola |
100000 |
Construction of Swajaldhara with pipeline near Ananda Bagdi house at Kundola1 |
Completion of work |
-
latitude : 23.973944135941565,23.973943339660764
Longitude : 87.70943180657923,87.70941571332514
file name : Image_31082022165508214.png
|
2022-08-31 16:55:08.320652 |
137 |
58535853 |
Maintanance of Tubewall |
1200000 |
Maintanance of Tubewall1 |
Plinth level |
-
latitude : 23.956195120699704
Longitude : 87.72271268069744
file name : Image_07092022164845863.png
|
2022-09-07 16:48:45.980458 |
138 |
58535853 |
Maintanance of Tubewall |
1200000 |
Maintanance of Tubewall1 |
Completion of work |
-
latitude : 23.956101536750793
Longitude : 87.7226404286921
file name : Image_31082022165456497.png
|
2022-08-31 16:54:56.60917 |
139 |
49228688 |
Construction of PCC road from Dasharath Mondal house towards Biren Mondal house at Akna |
70000 |
Construction of PCC road from Dasharath Mondal house towards Biren Mondal house at Akna1 |
Plinth level |
-
latitude : 23.95654259249568,23.956556925550103
Longitude : 87.72289289161563,87.72283715195954
file name : Image_07092022164842149.png
|
2022-09-07 16:48:42.264144 |
140 |
49228688 |
Construction of PCC road from Dasharath Mondal house towards Biren Mondal house at Akna |
70000 |
Construction of PCC road from Dasharath Mondal house towards Biren Mondal house at Akna1 |
Completion of work |
-
latitude : 23.95647469907999,23.956510489806533
Longitude : 87.72281175479293,87.72282625548542
file name : Image_31082022165446848.png
|
2022-08-31 16:54:46.954184 |
141 |
48579711 |
Constructtion of Sajaldhara pump with water tank at Kotasur Football ground |
100000 |
Constructtion of Sajaldhara pump with water tank at Kotasur Football ground1 |
Plinth level |
-
latitude : 23.955549504607916,23.955570752732456
Longitude : 87.74102387018502,87.74109737947583
file name : Image_07092022164816721.png
|
2022-09-07 16:48:16.839777 |
142 |
48579711 |
Constructtion of Sajaldhara pump with water tank at Kotasur Football ground |
100000 |
Constructtion of Sajaldhara pump with water tank at Kotasur Football ground1 |
Completion of work |
-
latitude : 23.955499925650656,23.955499925650656
Longitude : 87.74106033146381,87.74106033146381
file name : Image_31082022165544176.png
|
2022-08-31 16:55:44.284565 |
143 |
48570188 |
Construction of Swajaldhara with pipeline at Bagdipara Kalitala at Bandoha |
100000 |
Construction of Swajaldhara with pipeline at Bagdipara Kalitala at Bandoha1 |
Plinth level |
-
latitude : 23.96743420511484,23.967430936172605
Longitude : 87.73347487673163,87.7334557659924
file name : Image_07092022164820600.png
|
2022-09-07 16:48:20.723983 |
144 |
48570188 |
Construction of Swajaldhara with pipeline at Bagdipara Kalitala at Bandoha |
100000 |
Construction of Swajaldhara with pipeline at Bagdipara Kalitala at Bandoha1 |
Completion of work |
-
latitude : 23.9674372645095,23.967427373863757
Longitude : 87.73348770104349,87.7335699275136
file name : Image_31082022165537532.png
|
2022-08-31 16:55:37.63745 |
145 |
48568765 |
Construction of Swajaldhara in front of Baidyanath Mardi house |
100000 |
Construction of Swajaldhara in front of Baidyanath Mardi house1 |
Plinth level |
-
latitude : 23.953894623555243,23.95388695411384
Longitude : 87.72146712988615,87.72147945128381
file name : Image_08092022120326924.png
|
2022-09-08 12:03:27.007642 |
146 |
48622504 |
Installation of water reservoir and pipeline in front of Biswanath Bagdi at Induripara |
40000 |
Installation of water reservoir and pipeline in front of Biswanath Bagdi at Induripara1 |
Plinth level |
-
latitude : 23.972357902675867,23.972351658158004,23.972351658158004
Longitude : 87.71101707592607,87.71103945560753,87.71103945560753
file name : Image_07092022164833709.png
|
2022-09-07 16:48:33.824267 |
147 |
48622504 |
Installation of water reservoir and pipeline in front of Biswanath Bagdi at Induripara |
40000 |
Installation of water reservoir and pipeline in front of Biswanath Bagdi at Induripara1 |
Completion of work |
-
latitude : 23.97229646332562,23.972298726439476
Longitude : 87.71097265183926,87.71102839149535
file name : Image_31082022165517038.png
|
2022-08-31 16:55:17.143082 |
148 |
48622380 |
Installation of water reservoir and pipeline in front of Prallad Bagdi house at Induripara |
40000 |
Installation of water reservoir and pipeline in front of Prallad Bagdi house at Induripara1 |
Plinth level |
-
latitude : 23.97397908847779,23.97398403380066
Longitude : 87.71354673430324,87.71355159580708
file name : Image_07092022164829778.png
|
2022-09-07 16:48:29.904439 |
149 |
48622380 |
Installation of water reservoir and pipeline in front of Prallad Bagdi house at Induripara |
40000 |
Installation of water reservoir and pipeline in front of Prallad Bagdi house at Induripara1 |
Completion of work |
-
latitude : 23.97390889003873,23.973894179798663
Longitude : 87.71351035684347,87.71352368406951
file name : Image_31082022165525118.png
|
2022-08-31 16:55:25.225261 |
150 |
48622306 |
Installation of water reservoir and pipeline in front of Basanti Mandir at Induripara |
40000 |
Installation of water reservoir and pipeline in front of Basanti Mandir at Induripara1 |
Plinth level |
-
latitude : 23.97416504099965,23.97418033797294
Longitude : 87.71448743529618,87.71446522325277
file name : Image_07092022164824843.png
|
2022-09-07 16:48:24.969011 |
151 |
48622306 |
Installation of water reservoir and pipeline in front of Basanti Mandir at Induripara |
40000 |
Installation of water reservoir and pipeline in front of Basanti Mandir at Induripara1 |
Completion of work |
-
latitude : 23.97409128025174,23.97410879842937
Longitude : 87.7144845854491,87.71465540863574
file name : Image_31082022165531511.png
|
2022-08-31 16:55:31.618174 |
152 |
107225093 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.972889692522585,23.9729114016518
Longitude : 87.69079732708633,87.69080855883658
file name : Image_24082024141414440.png
|
2024-08-24 14:14:14.526966 |
153 |
107225093 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.972911317832768,23.972935457713902
Longitude : 87.69076463766396,87.69080168567598
file name : Image_24082024141237924.png
|
2024-08-24 14:12:38.009837 |
154 |
107226304 |
Drainage Construction |
100000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.975016097538173
Longitude : 87.7059402409941
file name : Image_05092024160105047.png
|
2024-09-05 16:01:33.886767 |
155 |
107226304 |
Drainage Construction |
100000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.97500935010612
Longitude : 87.70607879385352
file name : Image_29082024125119479.png
|
2024-08-29 12:51:20.245978 |
156 |
107226304 |
Drainage Construction |
100000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.97500063292682
Longitude : 87.70602975971997
file name : Image_29082024120817422.png
|
2024-08-29 12:08:17.624312 |
157 |
107405230 |
Drainage Construction |
79075 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.94700163975358
Longitude : 87.74851871654391
file name : Image_30082024140525154.png
|
2024-08-30 14:05:25.320641 |
158 |
107405230 |
Drainage Construction |
79075 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.94702611491084
Longitude : 87.74855006486177
file name : Image_30082024140255176.png
|
2024-08-30 14:02:55.306638 |
159 |
107405230 |
Drainage Construction |
79075 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.947031144052744
Longitude : 87.74858367629349
file name : Image_30082024135737714.png
|
2024-08-30 13:57:38.568529 |
160 |
107405243 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.975057043135166
Longitude : 87.70481186918914
file name : Image_05092024160017578.png
|
2024-09-05 16:00:46.410089 |
161 |
107405243 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.97501391824335
Longitude : 87.70494447089732
file name : Image_30082024160548299.png
|
2024-08-30 16:05:48.457593 |
162 |
107405243 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.975057629868388
Longitude : 87.7048588078469
file name : Image_30082024160220623.png
|
2024-08-30 16:02:20.72718 |
163 |
34993916 |
Construction of PCC drain from Uttam Garai pump house towards Binay Krishna Garai pump |
50000 |
Construction of PCC drain from Uttam Garai pump house towards Binay Krishna Garai pump1 |
Plinth level |
-
latitude : 23.952860715799034,23.952754852361977,23.952545053325593
Longitude : 87.73960690945387,87.73952451534569,87.73940616287291
file name : Image_28032022173350297.png
|
2022-03-28 17:33:50.394286 |
164 |
34993916 |
Construction of PCC drain from Uttam Garai pump house towards Binay Krishna Garai pump |
50000 |
Construction of PCC drain from Uttam Garai pump house towards Binay Krishna Garai pump1 |
Completion of work |
-
latitude : 23.95294746849686,23.95287349820137
Longitude : 87.73965787142515,87.73954102769494
file name : Image_12112021135027076.png
|
2021-11-12 13:50:27.18479 |
165 |
34982890 |
Construction of PCC drain from Madhu Let house towards Bikash Let house at Nimpur |
250000 |
Construction of PCC drain from Madhu Let house towards Bikash Let house at Nimpur1 |
Plinth level |
-
latitude : 23.958476968109608,23.958525373600423
Longitude : 87.69760142080486,87.69768255762756
file name : Image_05042022115841519.png
|
2022-04-05 11:58:41.649458 |
166 |
34982890 |
Construction of PCC drain from Madhu Let house towards Bikash Let house at Nimpur |
250000 |
Construction of PCC drain from Madhu Let house towards Bikash Let house at Nimpur1 |
Completion of work |
-
latitude : 23.95842139609158,23.958418797701597
Longitude : 87.69765799865127,87.69765330478549
file name : Image_12112021170205124.png
|
2021-11-12 17:02:05.223735 |
167 |
34985148 |
Construction of PCC drain from Kalitala towards Pucca road at Induripara |
130000 |
Construction of PCC drain from Kalitala towards Pucca road at Induripara1 |
Plinth level |
-
latitude : 23.974490175023675,23.974524750374258
Longitude : 87.71235826425254,87.71233186125755
file name : Image_24032022133013793.png
|
2022-03-24 13:30:13.915696 |
168 |
34985148 |
Construction of PCC drain from Kalitala towards Pucca road at Induripara |
130000 |
Construction of PCC drain from Kalitala towards Pucca road at Induripara1 |
Completion of work |
-
latitude : 23.97446150891483,23.97448041010648
Longitude : 87.71231099031866,87.71229137666523
file name : Image_15122021171503798.png
|
2021-12-15 17:15:03.925147 |
169 |
58537505 |
Installation of Swajaldhara at Tamal Bagdi land at Mahalash village |
100000 |
Installation of Swajaldhara at Tamal Bagdi land at Mahalash village1 |
Completion of work |
-
latitude : 23.975666533224285
Longitude : 87.72820366546512
file name : Image_08062023212350632.png
|
2023-06-08 21:23:50.723773 |
170 |
77066974 |
Creation of drainage channel for management of grey water |
190000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.95990968681872
Longitude : 87.74570130743086
file name : Image_08062023121229380.png
|
2023-06-08 12:12:29.487678 |
171 |
77066974 |
Creation of drainage channel for management of grey water |
190000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.9596981
Longitude : 87.745289
file name : Image_31052023140834201.png
|
2023-05-31 14:08:34.29321 |
172 |
77072398 |
Creation of drainage channel for management of grey water |
50000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.952781171537936
Longitude : 87.73955108597875
file name : Image_08062023121224660.png
|
2023-06-08 12:12:24.766103 |
173 |
77072398 |
Creation of drainage channel for management of grey water |
50000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.952849064953625
Longitude : 87.73958352394402
file name : Image_31052023140837945.png
|
2023-05-31 14:08:38.052011 |
174 |
58600208 |
Installation of Napkin Vending Machine at Kotasur High School building premises |
50000 |
Installation of Napkin Vending Machine at Kotasur High School building premises1 |
Plinth level |
-
latitude : 23.9560632
Longitude : 87.7413347
file name : Image_06062023130045178.png
|
2023-06-06 13:00:45.28388 |
175 |
58600208 |
Installation of Napkin Vending Machine at Kotasur High School building premises |
50000 |
Installation of Napkin Vending Machine at Kotasur High School building premises1 |
Completion of work |
-
latitude : 23.95590925589204
Longitude : 87.74126015603542
file name : Image_06062023122851884.png
|
2023-06-06 12:28:51.98962 |
176 |
58182131 |
Construction of PCC drain from Lakshman Dhibar house towards Anil Dhibar house at Akolpur |
50000 |
Construction of PCC drain from Lakshman Dhibar house towards Anil Dhibar house at Akolpur1 |
Plinth level |
-
latitude : 23.954473603516817,23.95451312419027
Longitude : 87.70596890710294,87.70600193180144
file name : Image_21062023155623436.png
|
2023-06-21 15:56:23.535397 |
177 |
58182131 |
Construction of PCC drain from Lakshman Dhibar house towards Anil Dhibar house at Akolpur |
50000 |
Construction of PCC drain from Lakshman Dhibar house towards Anil Dhibar house at Akolpur1 |
Completion of work |
-
latitude : 23.954771915450692,23.954778159968555
Longitude : 87.70600813440979,87.70599606446922
file name : Image_08062023193417345.png
|
2023-06-08 19:34:17.426143 |
178 |
58183312 |
Construction of PCC drain from Bamdeb Mondal land towards Subhas Mondal land at Narayanghati |
100000 |
Construction of PCC drain from Bamdeb Mondal land towards Subhas Mondal land at Narayanghati1 |
Plinth level |
-
latitude : 23.955110921524465,23.955208277329803,23.955233925953507
Longitude : 87.73583002388477,87.73581904359162,87.73582985624671
file name : Image_21062023155627477.png
|
2023-06-21 15:56:27.572309 |
179 |
58183312 |
Construction of PCC drain from Bamdeb Mondal land towards Subhas Mondal land at Narayanghati |
100000 |
Construction of PCC drain from Bamdeb Mondal land towards Subhas Mondal land at Narayanghati1 |
Completion of work |
-
latitude : 23.9551468,23.95525747910142
Longitude : 87.7359051,87.73585047572851
file name : Image_08062023185357521.png
|
2023-06-08 18:53:57.597947 |
180 |
58834158 |
Construction of PCC drain from Ratan Mondal shallow towards Gostho Mondal land at Bahara |
100000 |
Construction of PCC drain from Ratan Mondal shallow towards Gostho Mondal land at Bahara1 |
Plinth level |
-
latitude : 23.94576468039304,23.94586232956499
Longitude : 87.75980176404119,87.75980436243117
file name : Image_05072023100933433.png
|
2023-07-05 10:09:33.522425 |
181 |
58834158 |
Construction of PCC drain from Ratan Mondal shallow towards Gostho Mondal land at Bahara |
100000 |
Construction of PCC drain from Ratan Mondal shallow towards Gostho Mondal land at Bahara1 |
Completion of work |
-
latitude : 23.94586069509387,23.94602016080171
Longitude : 87.75979514233768,87.7598649635911
file name : Image_08062023121220151.png
|
2023-06-08 12:12:20.268238 |
182 |
58541511 |
Installation of Submersible Pump with Pipe Line at Itahat Prymary School |
65000 |
Installation of Submersible Pump with Pipe Line at Itahat Prymary School1 |
Completion of work |
-
latitude : 23.97139649838209
Longitude : 87.68867771141231
file name : Image_08062023201117962.png
|
2023-06-08 20:11:18.060576 |
183 |
58835556 |
Installation of Submersible Pump with Reserver and Pipe Line at Boipur Play Ground |
130000 |
Installation of Submersible Pump with Reserver and Pipe Line at Boipur Play Ground1 |
Plinth level |
-
latitude : 23.932820758782327,23.932775789871812
Longitude : 87.75126747786999,87.75123587809503
file name : Image_23062023154534142.png
|
2023-06-23 15:45:34.229238 |
184 |
58835556 |
Installation of Submersible Pump with Reserver and Pipe Line at Boipur Play Ground |
130000 |
Installation of Submersible Pump with Reserver and Pipe Line at Boipur Play Ground1 |
Completion of work |
-
latitude : 23.932884712703526,23.93285948317498
Longitude : 87.7514189388603,87.75134542956948
file name : Image_09062023124234523.png
|
2023-06-09 12:42:34.625711 |
185 |
58561341 |
Installation of Swajaldhara with tank and pipeline at Chhatal Gore Par at Kotasur village |
100000 |
Installation of Swajaldhara with tank and pipeline at Chhatal Gore Par at Kotasur village1 |
Plinth level |
-
latitude : 23.956266241148114
Longitude : 87.74839927442372
file name : Image_01072023191402854.png
|
2023-07-01 19:14:02.946041 |
186 |
58561341 |
Installation of Swajaldhara with tank and pipeline at Chhatal Gore Par at Kotasur village |
100000 |
Installation of Swajaldhara with tank and pipeline at Chhatal Gore Par at Kotasur village1 |
Completion of work |
-
latitude : 23.956290506757796
Longitude : 87.7484642341733
file name : Image_08062023121234892.png
|
2023-06-08 12:12:35.006013 |
187 |
58562107 |
Installation of Swajaldhara with tank and pipeline at Karam Kuro Pukur Par at Kotasur village |
100000 |
Installation of Swajaldhara with tank and pipeline at Karam Kuro Pukur Par at Kotasur village1 |
Completion of work |
-
latitude : 23.957416992634535
Longitude : 87.74790625087917
file name : Image_08062023180848032.png
|
2023-06-08 18:08:48.131746 |
188 |
58551792 |
Installation of Swajaldhara with tank and pipeline beside Loknath Mandir at Akolpur |
100000 |
Installation of Swajaldhara with tank and pipeline beside Loknath Mandir at Akolpur1 |
Completion of work |
-
latitude : 23.952856273390353
Longitude : 87.71279973909259
file name : Image_08062023192733661.png
|
2023-06-08 19:27:33.7413 |
189 |
58536515 |
Installation of Swajaldhara beside the Kundola Primary School |
100000 |
Installation of Swajaldhara beside the Kundola Primary School1 |
Completion of work |
-
latitude : 23.97489816416055
Longitude : 87.70492921583354
file name : Image_08062023204440334.png
|
2023-06-08 20:44:40.436129 |
190 |
58778970 |
Installation of Swajaldhara with tank and pipeline near Mukhagni house at Satgharia village |
100000 |
Installation of Swajaldhara with tank and pipeline near Mukhagni house at Satgharia village1 |
Completion of work |
-
latitude : 23.958084820769727
Longitude : 87.75539229623973
file name : Image_08062023174153772.png
|
2023-06-08 17:41:53.865983 |
191 |
58777667 |
Installation of Swajaldhara with tank and pipeline at Ghorer Pukur Par at Moutha village |
100000 |
Installation of Swajaldhara with tank and pipeline at Ghorer Pukur Par at Moutha village1 |
Plinth level |
-
latitude : 23.961798967793584
Longitude : 87.74700603447855
file name : Image_12062023131603366.png
|
2023-06-12 13:16:03.457041 |
192 |
58777667 |
Installation of Swajaldhara with tank and pipeline at Ghorer Pukur Par at Moutha village |
100000 |
Installation of Swajaldhara with tank and pipeline at Ghorer Pukur Par at Moutha village1 |
Completion of work |
-
latitude : 23.9618534501642
Longitude : 87.74699321016669
file name : Image_09062023122716177.png
|
2023-06-09 12:27:16.278798 |
193 |
58568845 |
Installation of Swajaldhara with tank and pipeline infront of Bhakat Mahara house at Kotasur village |
100000 |
Installation of Swajaldhara with tank and pipeline infront of Bhakat Mahara house at Kotasur village1 |
Completion of work |
-
latitude : 23.957312260754406
Longitude : 87.75046993978322
file name : Image_06062023143737084.png
|
2023-06-06 14:37:37.169421 |
194 |
58827969 |
Construction of Mukhagni house near Kali Mandir at Kundola village |
200000 |
Construction of Mukhagni house near Kali Mandir at Kundola village1 |
Plinth level |
-
latitude : 23.97529454436153
Longitude : 87.70171098411083
file name : Image_24072023130505458.png
|
2023-07-24 13:05:05.561377 |
195 |
58827969 |
Construction of Mukhagni house near Kali Mandir at Kundola village |
200000 |
Construction of Mukhagni house near Kali Mandir at Kundola village1 |
Completion of work |
-
latitude : 23.975767116062343
Longitude : 87.70176077261567
file name : Image_08062023204033174.png
|
2023-06-08 20:40:33.29031 |
196 |
58572659 |
Installation of Water ATM Machine with purifier at Kotasur Bus stand under Kundola GP |
350000 |
Installation of Water ATM Machine with purifier at Kotasur Bus stand under Kundola GP1 |
Roof laid |
-
latitude : 23.95577527116984
Longitude : 87.74079730734229
file name : Image_21082024111545518.png
|
2024-08-21 11:15:45.415597 |
197 |
58572659 |
Installation of Water ATM Machine with purifier at Kotasur Bus stand under Kundola GP |
350000 |
Installation of Water ATM Machine with purifier at Kotasur Bus stand under Kundola GP1 |
Plinth level |
-
latitude : 23.955817306414247
Longitude : 87.74089604616165
file name : Image_20082024155717796.png
|
2024-08-20 15:57:17.189452 |
198 |
58572659 |
Installation of Water ATM Machine with purifier at Kotasur Bus stand under Kundola GP |
350000 |
Installation of Water ATM Machine with purifier at Kotasur Bus stand under Kundola GP1 |
Completion of work |
-
latitude : 23.9553418
Longitude : 87.7404296
file name : Image_08062023213640981.png
|
2023-06-08 21:36:41.076285 |
199 |
58863944 |
Construction of PCC road from old PCC road towards Putu Maddi house at Hatinagar Adibasipara |
200000 |
Construction of PCC road from old PCC road towards Putu Maddi house at Hatinagar Adibasipara1 |
Plinth level |
-
latitude : 23.95315374713391,23.953098971396685
Longitude : 87.73720507510006,87.73742903955281
file name : Image_05072023011421457.png
|
2023-07-05 01:14:21.563606 |
200 |
58863944 |
Construction of PCC road from old PCC road towards Putu Maddi house at Hatinagar Adibasipara |
200000 |
Construction of PCC road from old PCC road towards Putu Maddi house at Hatinagar Adibasipara1 |
Completion of work |
-
latitude : 23.953119129873812,23.953119129873812
Longitude : 87.73724472150207,87.73724472150207
file name : Image_08062023184825964.png
|
2023-06-08 18:48:26.053619 |
201 |
58781097 |
Construction of Bathing Ghat with Toilet at Begre pukur par beside Arun Mondal house at village Bidy |
200000 |
Construction of Bathing Ghat with Toilet at Begre pukur par beside Arun Mondal house at village Bidy1 |
Plinth level |
-
latitude : 23.95886048208922
Longitude : 87.73894214071333
file name : Image_11062024115754190.png
|
2024-06-11 11:57:54.282845 |
202 |
58781097 |
Construction of Bathing Ghat with Toilet at Begre pukur par beside Arun Mondal house at village Bidy |
200000 |
Construction of Bathing Ghat with Toilet at Begre pukur par beside Arun Mondal house at village Bidy1 |
Plinth level |
-
latitude : 23.958997819572687
Longitude : 87.73886519484222
file name : Image_24072023130450249.png
|
2023-07-24 13:04:50.350846 |
203 |
58781097 |
Construction of Bathing Ghat with Toilet at Begre pukur par beside Arun Mondal house at village Bidy |
200000 |
Construction of Bathing Ghat with Toilet at Begre pukur par beside Arun Mondal house at village Bidy1 |
Completion of work |
-
latitude : 23.9588564587757
Longitude : 87.73891313932836
file name : Image_08062023184225041.png
|
2023-06-08 18:42:25.12661 |
204 |
58866085 |
Construction of Mukhagni house at Ektalgach pukur par at Nima village |
200000 |
Construction of Mukhagni house at Ektalgach pukur par at Nima village1 |
Completion of work |
-
latitude : 23.945617619901896
Longitude : 87.7442140225321
file name : Image_08062023182814568.png
|
2023-06-08 18:28:14.658016 |
205 |
58860588 |
Construction of Mukhagni house beside Pacca road at Gangarampur village |
200000 |
Construction of Mukhagni house beside Pacca road at Gangarampur village1 |
Roof laid |
-
latitude : 23.958447254262865
Longitude : 87.77627010829747
file name : Image_22072024151620918.png
|
2024-07-22 15:16:21.065328 |
206 |
58860588 |
Construction of Mukhagni house beside Pacca road at Gangarampur village |
200000 |
Construction of Mukhagni house beside Pacca road at Gangarampur village1 |
Plinth level |
-
latitude : 23.95842403639108
Longitude : 87.77630547992885
file name : Image_22072024150957100.png
|
2024-07-22 15:09:57.209335 |
207 |
58860588 |
Construction of Mukhagni house beside Pacca road at Gangarampur village |
200000 |
Construction of Mukhagni house beside Pacca road at Gangarampur village1 |
Completion of work |
-
latitude : 23.95841137971729
Longitude : 87.7763497363776
file name : Image_08062023175428207.png
|
2023-06-08 17:54:28.310779 |
208 |
58855672 |
Construction of PCC road from Tapasi Das house towards Sadhan Mondal house at Kotasur village |
150000 |
Construction of PCC road from Tapasi Das house towards Sadhan Mondal house at Kotasur village1 |
Plinth level |
-
latitude : 23.956747488118708,23.956747320480645
Longitude : 87.748545370996,87.74852399714291
file name : Image_01072023191352712.png
|
2023-07-01 19:13:52.563358 |
209 |
58855672 |
Construction of PCC road from Tapasi Das house towards Sadhan Mondal house at Kotasur village |
150000 |
Construction of PCC road from Tapasi Das house towards Sadhan Mondal house at Kotasur village1 |
Completion of work |
-
latitude : 23.956808298826218,23.956808298826218
Longitude : 87.74858518503606,87.74858518503606
file name : Image_08062023173442639.png
|
2023-06-08 17:34:42.744535 |
210 |
58858944 |
Installation of High Mast light near BL & LRO Office |
200000 |
Installation of High Mast light near BL & LRO Office1 |
Plinth level |
-
latitude : 23.9584243
Longitude : 87.7502785
file name : Image_06062023143439977.png
|
2023-06-06 14:34:40.066457 |
211 |
58858944 |
Installation of High Mast light near BL & LRO Office |
200000 |
Installation of High Mast light near BL & LRO Office1 |
Plinth level |
-
latitude : 23.958459994755685
Longitude : 87.75027120485902
file name : Image_02062023152936466.png
|
2023-06-02 15:29:36.559836 |
212 |
58858944 |
Installation of High Mast light near BL & LRO Office |
200000 |
Installation of High Mast light near BL & LRO Office1 |
Completion of work |
-
latitude : 23.958535389974713
Longitude : 87.75029534474015
file name : Image_02062023122313677.png
|
2023-06-02 12:23:13.764726 |
213 |
58865024 |
Installation of High Mast light at Kotasur JB School |
200000 |
Installation of High Mast light at Kotasur JB School1 |
Plinth level |
-
latitude : 23.9554047
Longitude : 87.7403164
file name : Image_06062023144307940.png
|
2023-06-06 14:43:08.040099 |
214 |
58865024 |
Installation of High Mast light at Kotasur JB School |
200000 |
Installation of High Mast light at Kotasur JB School1 |
Plinth level |
-
latitude : 23.955729715526104
Longitude : 87.74034703150392
file name : Image_02062023152931955.png
|
2023-06-02 15:29:32.057035 |
215 |
58865024 |
Installation of High Mast light at Kotasur JB School |
200000 |
Installation of High Mast light at Kotasur JB School1 |
Completion of work |
-
latitude : 23.95571307744831
Longitude : 87.74035683833063
file name : Image_02062023122306973.png
|
2023-06-02 12:23:07.073098 |
216 |
58861999 |
Construction of Road protection wall beside Chhoto gore from Rabi Bagdi house towards Nimai Bagdi ho |
200000 |
Construction of Road protection wall beside Chhoto gore from Rabi Bagdi house towards Nimai Bagdi ho1 |
Plinth level |
-
latitude : 23.960331045091152,23.960359962657094
Longitude : 87.74232692085207,87.74227906018496
file name : Image_22062023113227723.png
|
2023-06-22 11:32:27.840445 |
217 |
58861999 |
Construction of Road protection wall beside Chhoto gore from Rabi Bagdi house towards Nimai Bagdi ho |
200000 |
Construction of Road protection wall beside Chhoto gore from Rabi Bagdi house towards Nimai Bagdi ho1 |
Completion of work |
-
latitude : 23.932806719094515,23.960435525514185
Longitude : 87.75129698216915,87.74219876155257
file name : Image_07062023143016892.png
|
2023-06-07 14:30:17.002519 |
218 |
58649474 |
Construction of PCC drain from Nabakumar Mondal house towards Kotasur High Drain |
145000 |
Construction of PCC drain from Nabakumar Mondal house towards Kotasur High Drain1 |
Plinth level |
-
latitude : 23.959195632487535,23.959197183139622
Longitude : 87.7465317863971,87.74650831706822
file name : Image_07092022164851003.png
|
2022-09-07 16:48:51.117382 |
219 |
58649474 |
Construction of PCC drain from Nabakumar Mondal house towards Kotasur High Drain |
145000 |
Construction of PCC drain from Nabakumar Mondal house towards Kotasur High Drain1 |
Completion of work |
-
latitude : 23.959156782366335,23.959095343016088
Longitude : 87.74647227488458,87.74645458906889
file name : Image_31082022165424451.png
|
2022-08-31 16:54:24.558965 |
220 |
58863075 |
Construction of PCC road from Sainthia- Kandi road towards old PCC road at Bidyadhari village |
50000 |
Construction of PCC road from Sainthia- Kandi road towards old PCC road at Bidyadhari village1 |
Plinth level |
-
latitude : 23.95555268973112,23.9555856725201
Longitude : 87.73758159019053,87.73757019080222
file name : Image_09042024141345778.png
|
2024-04-09 14:13:45.865553 |
221 |
58863075 |
Construction of PCC road from Sainthia- Kandi road towards old PCC road at Bidyadhari village |
50000 |
Construction of PCC road from Sainthia- Kandi road towards old PCC road at Bidyadhari village1 |
Completion of work |
-
latitude : 23.9552978,23.9552978
Longitude : 87.7366182,87.7366182
file name : Image_08062023183541505.png
|
2023-06-08 18:35:41.60486 |
222 |
78622459 |
Any other operation and maintenance needs related to solid waste management |
100000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 23.9553365
Longitude : 87.7402064
file name : Image_10082023173309033.png
|
2023-08-10 17:33:09.116849 |
223 |
78622459 |
Any other operation and maintenance needs related to solid waste management |
100000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 23.95577133167535
Longitude : 87.74084131233394
file name : Image_10082023163242560.png
|
2023-08-10 16:32:42.663587 |
224 |
77107302 |
Operation & maintenance of community sanitary complex |
32000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 23.957881978712976
Longitude : 87.74256580509245
file name : Image_10082023173322188.png
|
2023-08-10 17:33:22.275411 |
225 |
77109732 |
Construction of Community Sanitary Complex |
32000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.9591531
Longitude : 87.7461246
file name : Image_10082023171624707.png
|
2023-08-10 17:16:24.806743 |
226 |
77109732 |
Construction of Community Sanitary Complex |
32000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.9480682
Longitude : 87.7487204
file name : Image_10082023163924607.png
|
2023-08-10 16:39:24.702228 |
227 |
77108705 |
Construction of Community Sanitary Complex |
32000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.9553093
Longitude : 87.7404323
file name : Image_10082023173317998.png
|
2023-08-10 17:33:18.08496 |
228 |
77108705 |
Construction of Community Sanitary Complex |
32000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.9553081
Longitude : 87.7404322
file name : Image_10082023163250714.png
|
2023-08-10 16:32:50.823451 |
229 |
77111221 |
Operation & maintenance of community sanitary complex |
20500 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 23.9591488
Longitude : 87.7461226
file name : Image_10082023174756489.png
|
2023-08-10 17:47:56.584616 |
230 |
78620372 |
Purchase of litter bins to be fixed at public places |
200000 |
Purchase of litter bins to be fixed at public places1 |
Plinth level |
-
latitude : 23.9552879
Longitude : 87.7404599
file name : Image_10082023173314253.png
|
2023-08-10 17:33:14.33926 |
231 |
78620372 |
Purchase of litter bins to be fixed at public places |
200000 |
Purchase of litter bins to be fixed at public places1 |
Completion of work |
-
latitude : 23.9591527
Longitude : 87.7461239
file name : Image_10082023163246410.png
|
2023-08-10 16:32:46.495471 |
232 |
71946310 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.953811014071107,23.953829873353243,23.9535789,23.9535789
Longitude : 87.73444935679436,87.73448556661606,87.7348839,87.7348839
file name : Image_20022024161045963.png
|
2024-02-20 16:10:46.058798 |
233 |
71946310 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.953747688792646,23.953796471469104
Longitude : 87.73441029712558,87.73446997627616
file name : Image_07022024132720912.png
|
2024-02-07 13:27:21.026191 |
234 |
71946310 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.953873249702156,23.953885780647397,23.954066201113164,23.95409428048879
Longitude : 87.7344869915396,87.73458707146347,87.73452311754227,87.73456963710487
file name : Image_18012024161441574.png
|
2024-01-18 16:14:41.668003 |
235 |
72376741 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.954826733097434
Longitude : 87.71047225221992
file name : Image_27012024131856406.png
|
2024-01-27 13:18:56.514443 |
236 |
72376741 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.95483000203967
Longitude : 87.71039111539721
file name : Image_10012024131355327.png
|
2024-01-10 13:13:55.417262 |
237 |
72181778 |
Drinking water facility |
100000 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.957743551582098
Longitude : 87.73710046894848
file name : Image_16012024155320065.png
|
2024-01-16 15:53:20.156455 |
238 |
72181778 |
Drinking water facility |
100000 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.9576864708215
Longitude : 87.73707741871476
file name : Image_10012024163248318.png
|
2024-01-10 16:32:48.422658 |
239 |
72374473 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.976134578697383
Longitude : 87.71868702024221
file name : Image_22022024154111986.png
|
2024-02-22 15:41:12.083103 |
240 |
72374473 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.97610800806433
Longitude : 87.71871375851333
file name : Image_14012024090937754.png
|
2024-01-14 09:09:37.836218 |
241 |
72374473 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.976167519576848
Longitude : 87.71879414096475
file name : Image_08012024155439769.png
|
2024-01-08 15:54:39.848958 |
242 |
71982233 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.931504129432142,23.93154147081077
Longitude : 87.7563042473048,87.75629318319261
file name : Image_01032024132200186.png
|
2024-03-01 13:22:00.30007 |
243 |
71982233 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.93149017356336,23.93148807808757,23.931671013124287,23.93170688766986
Longitude : 87.7562075201422,87.75620500557125,87.75631187483668,87.75633241049945
file name : Image_10012024120549842.png
|
2024-01-10 12:05:49.976369 |
244 |
71982233 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.931561042554677,23.9309757
Longitude : 87.75610442273319,87.7569066
file name : Image_08012024135843870.png
|
2024-01-08 13:58:43.957324 |
245 |
72177130 |
Drinking water facilities |
100000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 23.954492839984596
Longitude : 87.70716726779938
file name : Image_05032024134623404.png
|
2024-03-05 13:46:23.498124 |
246 |
72177130 |
Drinking water facilities |
100000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 23.954528588801622
Longitude : 87.70715821534395
file name : Image_09012024123847122.png
|
2024-01-09 12:38:47.217276 |
247 |
71916299 |
Construction of roads |
50000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.948163078166544,23.948146984912455
Longitude : 87.75783486664295,87.7578635327518
file name : Image_29022024170329587.png
|
2024-02-29 17:03:29.672373 |
248 |
71916299 |
Construction of roads |
50000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.948110565543175,23.9481447217986
Longitude : 87.75788884609938,87.75788012892008
file name : Image_23022024123949329.png
|
2024-02-23 12:39:49.429943 |
249 |
71916299 |
Construction of roads |
50000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.948138477280736,23.94818688277155
Longitude : 87.75784509256482,87.7577789593488
file name : Image_10012024163244504.png
|
2024-01-10 16:32:44.589114 |
250 |
72162651 |
Drinking water facility |
100000 |
Drinking water facility1 |
Roof laid |
-
latitude : 23.975719213485718
Longitude : 87.72717562504113
file name : Image_22022024154108430.png
|
2024-02-22 15:41:08.53454 |
251 |
72162651 |
Drinking water facility |
100000 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.97571200504899
Longitude : 87.72725072689354
file name : Image_22012024144342677.png
|
2024-01-22 14:43:42.760621 |
252 |
72162651 |
Drinking water facility |
100000 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.975721392780542
Longitude : 87.7272426802665
file name : Image_11012024163238604.png
|
2024-01-11 16:32:38.696175 |
253 |
72183170 |
Drinking water facility |
100000 |
Drinking water facility1 |
Roof laid |
-
latitude : 23.954422222450376
Longitude : 87.74794497527182
file name : Image_12032024161127052.png
|
2024-03-12 16:11:27.152356 |
254 |
72183170 |
Drinking water facility |
100000 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.954467861913145
Longitude : 87.74802359752357
file name : Image_16012024155316775.png
|
2024-01-16 15:53:16.859482 |
255 |
72183170 |
Drinking water facility |
100000 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.95448563154787
Longitude : 87.74797271937132
file name : Image_09012024143316618.png
|
2024-01-09 14:33:16.70464 |
256 |
72379568 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.958522649481893
Longitude : 87.77175494469702
file name : Image_28022024131038607.png
|
2024-02-28 13:10:38.707697 |
257 |
72379568 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.958556428551674
Longitude : 87.77174237184227
file name : Image_15012024123722302.png
|
2024-01-15 12:37:22.383961 |
258 |
71974617 |
Construction of roads |
120000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.957192357629538,23.957226346246898
Longitude : 87.74737173691392,87.74736335501075
file name : Image_12032024161133949.png
|
2024-03-12 16:11:34.04469 |
259 |
71974617 |
Construction of roads |
120000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.95721448585391,23.957288875244558
Longitude : 87.7473677136004,87.74741783738136
file name : Image_29012024141134016.png
|
2024-01-29 14:11:34.102603 |
260 |
71974617 |
Construction of roads |
120000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.957248348742723,23.957355259917676,23.957587061449885,23.957801135256886,23.95779401063919
Longitude : 87.74729412049055,87.74739906191826,87.74760223925114,87.7477213460952,87.74784464389086
file name : Image_11012024132938906.png
|
2024-01-11 13:29:39.007077 |
261 |
71888783 |
Construction of roads |
120000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.970821709372103,23.970821709372103,23.97086181677878
Longitude : 87.70037767477334,87.70037767477334,87.70048412494361
file name : Image_10012024131348376.png
|
2024-01-10 13:13:48.472571 |
262 |
71888783 |
Construction of roads |
120000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.9594614,23.9594614,23.9594614
Longitude : 87.7482049,87.7482049,87.7482049
file name : Image_08012024135848134.png
|
2024-01-08 13:58:48.226592 |
263 |
72379009 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.96336902398616
Longitude : 87.74732731282711
file name : Image_11062024115759563.png
|
2024-06-11 11:57:59.669104 |
264 |
72379009 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.963380842469633
Longitude : 87.74728783406317
file name : Image_12032024135428572.png
|
2024-03-12 13:54:28.704061 |
265 |
107226217 |
Pipe water connection to playground |
125000 |
Pipe water connection to playground1 |
Roof laid |
-
latitude : 23.966430807486176
Longitude : 87.69457597285509
file name : Image_23092024160741794.png
|
2024-09-23 16:07:41.91319 |
266 |
107226217 |
Pipe water connection to playground |
125000 |
Pipe water connection to playground1 |
Plinth level |
-
latitude : 23.966452390886843
Longitude : 87.69460128620267
file name : Image_23092024160026725.png
|
2024-09-23 16:00:26.817394 |
267 |
107226217 |
Pipe water connection to playground |
125000 |
Pipe water connection to playground1 |
Completion of work |
-
latitude : 23.966474644839764
Longitude : 87.69446005113423
file name : Image_05092024161633297.png
|
2024-09-05 16:17:02.389572 |
268 |
72377432 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.956912150606513
Longitude : 87.72316161543131
file name : Image_15032024120206041.png
|
2024-03-15 12:02:06.135358 |
269 |
72377432 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.956944085657597
Longitude : 87.72317485883832
file name : Image_05022024152646897.png
|
2024-02-05 15:26:47.004729 |
270 |
72377432 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.956955107860267
Longitude : 87.72318382747471
file name : Image_10012024163236723.png
|
2024-01-10 16:32:36.813348 |
271 |
72374046 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.97504283580929
Longitude : 87.70512208342552
file name : Image_01032024132206848.png
|
2024-03-01 13:22:07.034529 |
272 |
72374046 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.974995142780244
Longitude : 87.70507573150098
file name : Image_31012024122840670.png
|
2024-01-31 12:28:40.771399 |
273 |
72374046 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.974971463903785
Longitude : 87.70509417168796
file name : Image_22012024144339328.png
|
2024-01-22 14:43:39.424288 |
274 |
107226146 |
Pipe water connection to playground |
125000 |
Pipe water connection to playground1 |
Roof laid |
-
latitude : 23.976569431833923
Longitude : 87.71320383064449
file name : Image_23092024162554088.png
|
2024-09-23 16:25:54.200542 |
275 |
107226146 |
Pipe water connection to playground |
125000 |
Pipe water connection to playground1 |
Roof laid |
-
latitude : 23.976569431833923
Longitude : 87.71320383064449
file name : Image_23092024162515439.png
|
2024-09-23 16:25:15.558888 |
276 |
107226146 |
Pipe water connection to playground |
125000 |
Pipe water connection to playground1 |
Plinth level |
-
latitude : 23.976589464582503
Longitude : 87.71314985118806
file name : Image_05092024155055279.png
|
2024-09-05 15:51:23.986513 |
277 |
107226146 |
Pipe water connection to playground |
125000 |
Pipe water connection to playground1 |
Completion of work |
-
latitude : 23.976612808182836
Longitude : 87.71325747482479
file name : Image_05092024153043671.png
|
2024-09-05 15:30:43.757332 |
278 |
107226796 |
Pipe water connection to playground |
125000 |
Pipe water connection to playground1 |
Plinth level |
-
latitude : 23.93419245723635
Longitude : 87.7492240536958
file name : Image_10092024115653109.png
|
2024-09-10 11:58:54.654813 |
279 |
107226796 |
Pipe water connection to playground |
125000 |
Pipe water connection to playground1 |
Completion of work |
-
latitude : 23.93425607588142
Longitude : 87.74919144809246
file name : Image_10092024114436107.png
|
2024-09-10 11:44:39.589731 |
280 |
71902875 |
Installation of Solar lights |
50000 |
Installation of Solar lights1 |
Roof laid |
-
latitude : 23.948654970154166
Longitude : 87.7459585480392
file name : Image_21022024143455757.png
|
2024-02-21 14:34:55.891684 |
281 |
71902875 |
Installation of Solar lights |
50000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.94870065152645
Longitude : 87.74594706483185
file name : Image_20022024153337424.png
|
2024-02-20 15:33:37.57974 |
282 |
71902875 |
Installation of Solar lights |
50000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.94866787828505
Longitude : 87.74602736346424
file name : Image_18012024161506934.png
|
2024-01-18 16:15:07.030957 |
283 |
71902875 |
Installation of Solar lights |
50000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.94866787828505
Longitude : 87.74602736346424
file name : Image_18012024161500854.png
|
2024-01-18 16:15:00.948747 |
284 |
71917069 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.957365485839546
Longitude : 87.70298201590776
file name : Image_12032024115600036.png
|
2024-03-12 11:56:00.127894 |
285 |
71917069 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.957335227169096
Longitude : 87.70295695401728
file name : Image_07022024085014088.png
|
2024-02-07 08:50:14.182987 |
286 |
71930158 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Roof laid |
-
latitude : 23.956131795421243
Longitude : 87.70441699773073
file name : Image_20022024161053565.png
|
2024-02-20 16:10:53.675007 |
287 |
71930158 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.956084311939776
Longitude : 87.7043458353728
file name : Image_07022024132715530.png
|
2024-02-07 13:27:15.666328 |
288 |
71930158 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.956084311939776
Longitude : 87.7043458353728
file name : Image_07022024115221656.png
|
2024-02-07 11:52:21.761268 |
289 |
71930158 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.956173663027585
Longitude : 87.70448279567063
file name : Image_18012024161447207.png
|
2024-01-18 16:14:47.291673 |
290 |
58560517 |
Construction of Pacca Ghat with Toilet at Law pukur at Akna village |
150000 |
Construction of Pacca Ghat with Toilet at Law pukur at Akna village1 |
Plinth level |
-
latitude : 23.955801757983863
Longitude : 87.72413550876081
file name : Image_29022024133738292.png
|
2024-02-29 13:37:38.403496 |
291 |
58560517 |
Construction of Pacca Ghat with Toilet at Law pukur at Akna village |
150000 |
Construction of Pacca Ghat with Toilet at Law pukur at Akna village1 |
Completion of work |
-
latitude : 23.95572418347001
Longitude : 87.72417029365897
file name : Image_08062023191503611.png
|
2023-06-08 19:15:03.692731 |
292 |
72297690 |
Construction of Water treatment plant |
60000 |
Construction of Water treatment plant1 |
Roof laid |
-
latitude : 23.95915996748954
Longitude : 87.74809023365378
file name : Image_11032024160542655.png
|
2024-03-11 16:05:42.742091 |
293 |
72297690 |
Construction of Water treatment plant |
60000 |
Construction of Water treatment plant1 |
Plinth level |
-
latitude : 23.959384351037443
Longitude : 87.74810255505145
file name : Image_11032024154918886.png
|
2024-03-11 15:49:18.957516 |
294 |
72297690 |
Construction of Water treatment plant |
60000 |
Construction of Water treatment plant1 |
Completion of work |
-
latitude : 23.9594788
Longitude : 87.7481889
file name : Image_07032024133851337.png
|
2024-03-07 13:38:51.429361 |
295 |
72386273 |
Drinking water facilities |
1103075 |
Drinking water facilities1 |
Plinth level |
-
latitude : 23.9595219
Longitude : 87.7481935
file name : Image_30042024123550745.png
|
2024-04-30 12:35:50.821198 |
296 |
72386273 |
Drinking water facilities |
1103075 |
Drinking water facilities1 |
Completion of work |
-
latitude : 23.9594121
Longitude : 87.7481146
file name : Image_30042024122830243.png
|
2024-04-30 12:28:30.326896 |
297 |
71985949 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.961878679692745
Longitude : 87.74640748277307
file name : Image_01042024121152248.png
|
2024-04-01 12:11:52.350471 |
298 |
71985949 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.96181761752814
Longitude : 87.74639071896672
file name : Image_13032024134534093.png
|
2024-03-13 13:45:34.199309 |
299 |
71984153 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.967614457942545
Longitude : 87.7435303106904
file name : Image_01042024121155968.png
|
2024-04-01 12:11:56.081335 |
300 |
71984153 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.967631557025015
Longitude : 87.74355059489608
file name : Image_16032024122603832.png
|
2024-03-16 12:26:03.933149 |
301 |
71970922 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.950523044914007
Longitude : 87.7486576884985
file name : Image_26042024123336837.png
|
2024-04-26 12:33:36.942492 |
302 |
71970922 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.950611515901983
Longitude : 87.74860354140401
file name : Image_16032024122611284.png
|
2024-03-16 12:26:11.382117 |
303 |
71966934 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Roof laid |
-
latitude : 23.956222529523075
Longitude : 87.7473828010261
file name : Image_06082024164241650.png
|
2024-08-06 16:42:41.812525 |
304 |
71966934 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.95622722338885
Longitude : 87.7473470941186
file name : Image_06082024160113374.png
|
2024-08-06 16:01:13.507483 |
305 |
71966934 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.956184391863644
Longitude : 87.74728003889322
file name : Image_28062024135939448.png
|
2024-06-28 13:59:39.555559 |
306 |
71961615 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.957211636006832
Longitude : 87.74738757871091
file name : Image_06082024163740025.png
|
2024-08-06 16:37:40.140128 |
307 |
71961615 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.957257233560085
Longitude : 87.74733183905482
file name : Image_06082024154650377.png
|
2024-08-06 15:46:50.473816 |
308 |
71904752 |
Installation of Solar lights |
50000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.950172471813858
Longitude : 87.74733988568187
file name : Image_24072024150003630.png
|
2024-07-24 15:00:03.817165 |
309 |
71904752 |
Installation of Solar lights |
50000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.950132657773793
Longitude : 87.74747231975198
file name : Image_16032024122618972.png
|
2024-03-16 12:26:19.083351 |
310 |
71971033 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.95498137921095,23.954995209351182
Longitude : 87.70578098483384,87.70567922852933
file name : Image_24072024145956242.png
|
2024-07-24 14:59:56.347144 |
311 |
71971033 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.955003255978227,23.954994161613286
Longitude : 87.70583672448993,87.7058453578502
file name : Image_01042024164620637.png
|
2024-04-01 16:46:20.743718 |
312 |
71971033 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.955003255978227,23.954994161613286
Longitude : 87.70583672448993,87.7058453578502
file name : Image_01042024164612845.png
|
2024-04-01 16:46:12.960908 |
313 |
71899439 |
Construction of roads |
120000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.96755947265774,23.967538182623684
Longitude : 87.69433960318565,87.69430314190686
file name : Image_05092024161620374.png
|
2024-09-05 16:16:49.420232 |
314 |
71899439 |
Construction of roads |
120000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.96744342520833,23.967451262287796
Longitude : 87.69435066729784,87.69434756599367
file name : Image_21032024143710023.png
|
2024-03-21 14:37:10.129877 |
315 |
71899439 |
Construction of roads |
120000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.967524813488126,23.967485167086124
Longitude : 87.69437933340669,87.69435343332589
file name : Image_14032024125428729.png
|
2024-03-14 12:54:28.813231 |
316 |
71884083 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.956029452383518,23.95604877267033
Longitude : 87.7344024181366,87.73438297212124
file name : Image_08042024135121744.png
|
2024-04-08 13:51:21.846626 |
317 |
71884083 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.95588545128703,23.955952590331435
Longitude : 87.73442496545613,87.7344434056431
file name : Image_13032024134541044.png
|
2024-03-13 13:45:41.134779 |
318 |
72024079 |
Construction of roads |
120000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.97382804658264,23.97382804658264
Longitude : 87.71076788194478,87.71076788194478
file name : Image_12072024160843615.png
|
2024-07-12 16:08:43.700765 |
319 |
72024079 |
Construction of roads |
120000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.973863585852087,23.973830016329885
Longitude : 87.7107806224376,87.71083753556013
file name : Image_14032024125432074.png
|
2024-03-14 12:54:32.157972 |
320 |
71958948 |
Construction of roads |
120000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.95924345124513,23.959276895038784
Longitude : 87.74468399584293,87.744718529284
file name : Image_21032024155948977.png
|
2024-03-21 15:59:49.711144 |
321 |
71958948 |
Construction of roads |
120000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.95929625723511,23.959331084042788
Longitude : 87.74467653594911,87.74475608021021
file name : Image_19032024201813032.png
|
2024-03-19 20:18:13.119643 |
322 |
71958948 |
Construction of roads |
120000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.95915481261909,23.959182808175683
Longitude : 87.74463873356581,87.74471777491271
file name : Image_13032024134537515.png
|
2024-03-13 13:45:37.606326 |
323 |
71869029 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.978840969502926
Longitude : 87.70153437741101
file name : Image_20062024114455117.png
|
2024-06-20 11:44:55.239792 |
324 |
71869029 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.97880329284817
Longitude : 87.70155600272119
file name : Image_16032024122556160.png
|
2024-03-16 12:25:56.249626 |
325 |
58551056 |
Construction of Pacca Ghat with Toilet at Bele pukur at Pukurpara |
150000 |
Construction of Pacca Ghat with Toilet at Bele pukur at Pukurpara1 |
Roof laid |
-
latitude : 23.95746581722051
Longitude : 87.70325912162662
file name : Image_01042024164602870.png
|
2024-04-01 16:46:02.961831 |
326 |
58551056 |
Construction of Pacca Ghat with Toilet at Bele pukur at Pukurpara |
150000 |
Construction of Pacca Ghat with Toilet at Bele pukur at Pukurpara1 |
Plinth level |
-
latitude : 23.957471097819507
Longitude : 87.7032770588994
file name : Image_14032024125425227.png
|
2024-03-14 12:54:25.318849 |
327 |
58551056 |
Construction of Pacca Ghat with Toilet at Bele pukur at Pukurpara |
150000 |
Construction of Pacca Ghat with Toilet at Bele pukur at Pukurpara1 |
Completion of work |
-
latitude : 23.95743878558278
Longitude : 87.70323623903096
file name : Image_08062023194340745.png
|
2023-06-08 19:43:40.843349 |
328 |
71976920 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.954859632067382,23.95489559043199
Longitude : 87.70398893393576,87.7039538975805
file name : Image_21032024143716429.png
|
2024-03-21 14:37:16.521758 |
329 |
71976920 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.95489902701229,23.95491176750511
Longitude : 87.70397594198585,87.70392715930939
file name : Image_22012024134151633.png
|
2024-01-22 13:41:51.729802 |
330 |
71976920 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.955009668134153,23.955004052259028
Longitude : 87.70373026840389,87.70380386151373
file name : Image_10012024163239947.png
|
2024-01-10 16:32:40.033079 |
331 |
107225365 |
Pipe water connection to playground |
125000 |
Pipe water connection to playground1 |
Roof laid |
-
latitude : 23.976473794318736
Longitude : 87.70572901703417
file name : Image_23092024162547105.png
|
2024-09-23 16:25:47.197514 |
332 |
107225365 |
Pipe water connection to playground |
125000 |
Pipe water connection to playground1 |
Roof laid |
-
latitude : 23.976473794318736
Longitude : 87.70572901703417
file name : Image_23092024162504738.png
|
2024-09-23 16:25:09.027885 |
333 |
107225365 |
Pipe water connection to playground |
125000 |
Pipe water connection to playground1 |
Plinth level |
-
latitude : 23.976496090181172
Longitude : 87.70564343780279
file name : Image_05092024154558533.png
|
2024-09-05 15:46:27.194659 |
334 |
107225365 |
Pipe water connection to playground |
125000 |
Pipe water connection to playground1 |
Completion of work |
-
latitude : 23.97650966886431
Longitude : 87.70565684884787
file name : Image_05092024154324677.png
|
2024-09-05 15:43:53.294026 |
335 |
72384494 |
Drainage Construction |
100000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.94915474113077
Longitude : 87.75155455805361
file name : Image_02072024121041961.png
|
2024-07-02 12:10:42.072019 |
336 |
72384494 |
Drainage Construction |
100000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.949116938747466
Longitude : 87.75156461633742
file name : Image_28062024123441943.png
|
2024-06-28 12:34:42.058626 |
337 |
72377819 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.95382777787745
Longitude : 87.73392255418003
file name : Image_26112024124452857.png
|
2024-11-26 12:44:52.948526 |
338 |
72377819 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.953827735967934
Longitude : 87.73397435434163
file name : Image_28062024123934726.png
|
2024-06-28 12:39:34.829624 |
339 |
72374847 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.976167771033943
Longitude : 87.72370132617652
file name : Image_18072024171031921.png
|
2024-07-18 17:10:32.011059 |
340 |
72374847 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.976729274727404
Longitude : 87.72366838529706
file name : Image_28062024123601902.png
|
2024-06-28 12:36:02.004291 |
341 |
72376353 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.95589245017618
Longitude : 87.7021030895412
file name : Image_08072024132519465.png
|
2024-07-08 13:25:19.244631 |
342 |
72376353 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.95588214043528
Longitude : 87.7021221164614
file name : Image_28062024123512798.png
|
2024-06-28 12:35:12.892689 |
343 |
72378358 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.958002887666225
Longitude : 87.75023289956152
file name : Image_06082024165057205.png
|
2024-08-06 16:50:57.306628 |
344 |
72378358 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.957931683398783
Longitude : 87.75019836612046
file name : Image_06082024160119594.png
|
2024-08-06 16:01:19.716607 |
345 |
72378358 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.9579385984689
Longitude : 87.75021873414516
file name : Image_28062024135936184.png
|
2024-06-28 13:59:36.277183 |
346 |
72378661 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.957092822529376
Longitude : 87.7438670117408
file name : Image_22072024155216605.png
|
2024-07-22 15:52:16.699945 |
347 |
72378661 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.95705715753138
Longitude : 87.74373181164265
file name : Image_28062024123557940.png
|
2024-06-28 12:35:58.047266 |
348 |
98054921 |
Installation of RO unit for drinking water in AWC/ Schools |
75000 |
Installation of RO unit for drinking water in AWC/ Schools1 |
Roof laid |
-
latitude : 23.97505578584969
Longitude : 87.69074091687799
file name : Image_18112024121452394.png
|
2024-11-18 12:14:52.477244 |
349 |
98054921 |
Installation of RO unit for drinking water in AWC/ Schools |
75000 |
Installation of RO unit for drinking water in AWC/ Schools1 |
Plinth level |
-
latitude : 23.974948246032
Longitude : 87.69081618636847
file name : Image_20092024162516170.png
|
2024-09-20 16:25:16.25605 |
350 |
98054921 |
Installation of RO unit for drinking water in AWC/ Schools |
75000 |
Installation of RO unit for drinking water in AWC/ Schools1 |
Completion of work |
-
latitude : 23.974994220770895
Longitude : 87.690767403692
file name : Image_20092024162021727.png
|
2024-09-20 16:20:21.816903 |
351 |
90548181 |
Drainage Construction |
100000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.953601717948914
Longitude : 87.73454608395696
file name : Image_23092024123209177.png
|
2024-09-23 12:32:09.265181 |
352 |
90548181 |
Drainage Construction |
100000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.953606076538563
Longitude : 87.73453921079636
file name : Image_23092024122753050.png
|
2024-09-23 12:27:53.138667 |
353 |
72184602 |
Drinking water facilities |
100000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 23.958564097993076
Longitude : 87.77174798771739
file name : Image_29072024124056205.png
|
2024-07-29 12:40:56.294386 |
354 |
72184602 |
Drinking water facilities |
100000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 23.95858802832663
Longitude : 87.77177950367332
file name : Image_08072024121431253.png
|
2024-07-08 12:14:31.453757 |
355 |
71898026 |
Construction of Retaining Walls |
100000 |
Construction of Retaining Walls1 |
Plinth level |
-
latitude : 23.9603129401803
Longitude : 87.74231954477727
file name : Image_01042024121159607.png
|
2024-04-01 12:11:59.70152 |
356 |
71898026 |
Construction of Retaining Walls |
100000 |
Construction of Retaining Walls1 |
Completion of work |
-
latitude : 23.96031063515693
Longitude : 87.74227268993855
file name : Image_12032024135425233.png
|
2024-03-12 13:54:25.385902 |
357 |
90544435 |
Drainage Construction |
163075 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.975488836877048
Longitude : 87.70429872907698
file name : Image_31122024154406018.png
|
2024-12-31 15:44:06.10952 |
358 |
72173059 |
Drinking water facility |
100000 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.956486769020557
Longitude : 87.69658687524498
file name : Image_24072024150000169.png
|
2024-07-24 15:00:00.260469 |
359 |
72173059 |
Drinking water facility |
100000 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.95643677096814
Longitude : 87.69654546864331
file name : Image_08072024132516224.png
|
2024-07-08 13:25:16.163584 |
360 |
90545810 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.972954945638776
Longitude : 87.69094887189567
file name : Image_18112024120415297.png
|
2024-11-18 12:04:15.41167 |
361 |
90545810 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.972906498238444
Longitude : 87.69096588715911
file name : Image_18112024120006193.png
|
2024-11-18 12:00:06.312726 |
362 |
90546150 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.958444697782397
Longitude : 87.69759186543524
file name : Image_16122024125952289.png
|
2024-12-16 12:59:52.395834 |
363 |
90546150 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.958472651429474
Longitude : 87.69763989374042
file name : Image_05122024124624732.png
|
2024-12-05 12:46:24.833735 |
364 |
90546150 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.9584367768839
Longitude : 87.6976319309324
file name : Image_05122024123526666.png
|
2024-12-05 12:35:26.780399 |
365 |
90546851 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.95548844244331
Longitude : 87.70333665423095
file name : Image_01102024153315626.png
|
2024-10-01 15:33:15.72036 |
366 |
90546851 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.95546053070575
Longitude : 87.7033256739378
file name : Image_23092024155543100.png
|
2024-09-23 15:55:43.185651 |
367 |
58869487 |
Construction of PCC road from Bahara Kotasur Pacca Road towards Nima Bahara Girls School |
200000 |
Construction of PCC road from Bahara Kotasur Pacca Road towards Nima Bahara Girls School1 |
Plinth level |
-
latitude : 23.94940401893109,23.949388973414898
Longitude : 87.74665801785886,87.74671761319041
file name : Image_07092022164813037.png
|
2022-09-07 16:48:13.168075 |
368 |
58869487 |
Construction of PCC road from Bahara Kotasur Pacca Road towards Nima Bahara Girls School |
200000 |
Construction of PCC road from Bahara Kotasur Pacca Road towards Nima Bahara Girls School1 |
Completion of work |
-
latitude : 23.949319068342447,23.949211151339114
Longitude : 87.74660437367857,87.74717618711293
file name : Image_31082022165436453.png
|
2022-08-31 16:54:36.55552 |
369 |
90784589 |
Drinking water facilities/ Installation of RO/ Water Filter |
54620 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
Roof laid |
-
latitude : 23.959439
Longitude : 87.7481731
file name : Image_28092024130726217.png
|
2024-09-28 13:07:26.312357 |
370 |
90784589 |
Drinking water facilities/ Installation of RO/ Water Filter |
54620 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
Plinth level |
-
latitude : 23.9594433
Longitude : 87.7481653
file name : Image_28092024130056109.png
|
2024-09-28 13:00:56.230789 |
371 |
90784589 |
Drinking water facilities/ Installation of RO/ Water Filter |
54620 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
Completion of work |
-
latitude : 23.9594456
Longitude : 87.7481649
file name : Image_28092024125710276.png
|
2024-09-28 12:57:10.402084 |
372 |
94743208 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.934304816648364,23.934304816648364,23.934287885203958
Longitude : 87.74901492521167,87.74901492521167,87.74901743978262
file name : Image_01102024150331417.png
|
2024-10-01 15:03:31.499923 |
373 |
94743208 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.934339936822653,23.934339936822653
Longitude : 87.74899740703404,87.74899740703404
file name : Image_01102024145552564.png
|
2024-10-01 14:55:52.667748 |
374 |
71920795 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Roof laid |
-
latitude : 23.97772994823754
Longitude : 87.70514731295407
file name : Image_01032024132203445.png
|
2024-03-01 13:22:03.581137 |
375 |
71920795 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.977675843052566
Longitude : 87.70513406954706
file name : Image_22012024134757628.png
|
2024-01-22 13:47:57.71256 |
376 |
71920795 |
Installation of Solar lights |
100000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.97768774535507
Longitude : 87.70513675175607
file name : Image_22012024134215023.png
|
2024-01-22 13:42:15.116338 |
377 |
94758616 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.95780281163752,23.957792459987104
Longitude : 87.77380867861211,87.77383550070226
file name : Image_14112024115322132.png
|
2024-11-14 11:53:22.223783 |
378 |
94758616 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.957842248491943,23.957819282077253
Longitude : 87.77380004525185,87.77385142631829
file name : Image_14112024114559672.png
|
2024-11-14 11:45:59.781137 |
379 |
90781435 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.96880929823965,23.968787756748497
Longitude : 87.69598823972046,87.69594700075686
file name : Image_02122024120711990.png
|
2024-12-02 12:07:12.101008 |
380 |
90781435 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.968832097016275,23.968823086470366
Longitude : 87.69589520059526,87.69592830911279
file name : Image_18112024115944226.png
|
2024-11-18 11:59:44.348249 |
381 |
90781435 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.968852339312434,23.968860595487058
Longitude : 87.69589964300394,87.6958636008203
file name : Image_18112024114326039.png
|
2024-11-18 11:43:26.137505 |
382 |
90779307 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.974998579360545,23.9750000461936
Longitude : 87.70430861972272,87.70431105047464
file name : Image_18112024132939156.png
|
2024-11-18 13:29:39.251477 |
383 |
90779307 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.974987766705453,23.97500013001263
Longitude : 87.70433166995645,87.70433267578483
file name : Image_18112024132558585.png
|
2024-11-18 13:25:58.709552 |
384 |
90780121 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.97189237177372,23.971890779212117
Longitude : 87.70329273305833,87.70327697508037
file name : Image_24122024130650444.png
|
2024-12-24 13:06:50.526807 |
385 |
90780121 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.97190360352397,23.971919612959027
Longitude : 87.7032889612019,87.70326096564531
file name : Image_24122024125209685.png
|
2024-12-24 12:52:09.930333 |
386 |
90780121 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.971897275187075,23.97190238814801
Longitude : 87.70325375720859,87.70324830897152
file name : Image_18122024123407289.png
|
2024-12-18 12:34:07.385758 |
387 |
90780121 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.97189287468791,23.971892748959363
Longitude : 87.7032291982323,87.70325769670308
file name : Image_13122024164241070.png
|
2024-12-13 16:42:41.15508 |
388 |
90780448 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.973625623621047,23.973634215071797
Longitude : 87.7174947783351,87.71754029206932
file name : Image_18112024123930013.png
|
2024-11-18 12:39:30.127097 |
389 |
90780448 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.973639621399343,23.973639495670795
Longitude : 87.7175529487431,87.71753794513643
file name : Image_18112024111233182.png
|
2024-11-18 11:12:33.276097 |
390 |
94746566 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.95644494332373,23.95642734132707
Longitude : 87.70074429921806,87.70077656954527
file name : Image_18112024132553782.png
|
2024-11-18 13:25:53.864083 |
391 |
94760229 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.953863945789635,23.953856946900487
Longitude : 87.74157824926078,87.74153122678399
file name : Image_02012025134644472.png
|
2025-01-02 13:46:43.840401 |
392 |
94760229 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.9538302924484,23.95380288362503
Longitude : 87.7415148820728,87.7415653411299
file name : Image_24122024121240716.png
|
2024-12-24 12:12:40.839752 |
393 |
94760229 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.953853049315512,23.95387815311551
Longitude : 87.74154975079,87.741475738585
file name : Image_24122024120520750.png
|
2024-12-24 12:05:20.863746 |
394 |
94760603 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.95023122895509,23.95019803661853
Longitude : 87.74749922566116,87.74748723953962
file name : Image_02122024143128283.png
|
2024-12-02 14:31:28.378792 |
395 |
94760603 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.950217189267278,23.95023730583489
Longitude : 87.74749587289989,87.74749838747084
file name : Image_02122024142701390.png
|
2024-12-02 14:27:01.485974 |
396 |
98051361 |
Installation of RO unit for drinking water in AWC/ Schools |
110000 |
Installation of RO unit for drinking water in AWC/ Schools1 |
Roof laid |
-
latitude : 23.9594975
Longitude : 87.7481667
file name : Image_09122024123434782.png
|
2024-12-09 12:34:34.871652 |
397 |
98051361 |
Installation of RO unit for drinking water in AWC/ Schools |
110000 |
Installation of RO unit for drinking water in AWC/ Schools1 |
Plinth level |
-
latitude : 23.95933359861374
Longitude : 87.74822895415127
file name : Image_28112024161721561.png
|
2024-11-28 16:17:21.651516 |
398 |
98051361 |
Installation of RO unit for drinking water in AWC/ Schools |
110000 |
Installation of RO unit for drinking water in AWC/ Schools1 |
Completion of work |
-
latitude : 23.959292694926262
Longitude : 87.7481048181653
file name : Image_28112024131353363.png
|
2024-11-28 13:13:53.455541 |
399 |
90547369 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.95412340760231
Longitude : 87.73187368176877
file name : Image_26112024124500784.png
|
2024-11-26 12:45:00.86801 |
400 |
90547369 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.95414972677827
Longitude : 87.7318721730262
file name : Image_20112024135104894.png
|
2024-11-20 13:51:04.997964 |
401 |
94287281 |
Procurement of Computer Printer, UPS, etc. |
200760 |
Procurement of Computer Printer, UPS, etc.1 |
|
-
latitude : 23.9594697
Longitude : 87.7481812
file name : Image_22112024143420011.png
|
2024-11-22 14:34:20.201954 |
402 |
94287281 |
Procurement of Computer Printer, UPS, etc. |
200760 |
Procurement of Computer Printer, UPS, etc.1 |
|
-
latitude : 23.9594717
Longitude : 87.74818
file name : Image_22112024143356306.png
|