1 |
34193146 |
Upgradation of road from Rezaul Karim house to towards Sluice gate at Tapna |
250000 |
Upgradation of road from Rezaul Karim house to towards Sluice gate at Tapna1 |
Plinth level |
-
latitude : 24.40448386128992,24.404472336173058
Longitude : 87.83533402718604,87.83527962863445
file name : Image_08012021161153051.png
|
2021-01-08 16:11:53.137545 |
2 |
34193146 |
Upgradation of road from Rezaul Karim house to towards Sluice gate at Tapna |
250000 |
Upgradation of road from Rezaul Karim house to towards Sluice gate at Tapna1 |
Completion of work |
-
latitude : 24.404481137171388,24.40446127206087
Longitude : 87.83537861891091,87.83534467220306
file name : Image_08012021155541995.png
|
2021-01-08 15:55:42.121375 |
3 |
39058758 |
Upgradation of Tubewell by purchasing materials |
2000000 |
Upgradation of Tubewell by purchasing materials1 |
Plinth level |
-
latitude : 24.423467530868948
Longitude : 87.83454805612564
file name : Image_05072021140154832.png
|
2021-07-05 14:01:54.9589 |
4 |
39058758 |
Upgradation of Tubewell by purchasing materials |
2000000 |
Upgradation of Tubewell by purchasing materials1 |
Completion of work |
-
latitude : 24.423448545858264
Longitude : 87.83455358818173
file name : Image_05072021135711699.png
|
2021-07-05 13:57:11.901054 |
5 |
34202147 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur |
100000 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur1 |
Roof laid |
-
latitude : 24.421221264638007
Longitude : 87.8366172965616
file name : Image_11012021170529504.png
|
2021-01-11 17:05:29.592177 |
6 |
34202147 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur |
100000 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur1 |
Roof laid |
-
latitude : 24.42127536982298
Longitude : 87.83658728934824
file name : Image_11012021170337367.png
|
2021-01-11 17:03:37.451466 |
7 |
34202147 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur |
100000 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur1 |
Roof laid |
-
latitude : 24.421233125030994
Longitude : 87.83657647669315
file name : Image_11012021164852972.png
|
2021-01-11 16:48:53.087238 |
8 |
34202147 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur |
100000 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur1 |
Roof laid |
-
latitude : 24.4240479
Longitude : 87.8346573
file name : Image_30122020123927877.png
|
2020-12-30 12:39:27.981029 |
9 |
34202147 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur |
100000 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur1 |
Roof laid |
-
latitude : 24.423510571941733
Longitude : 87.8344686795026
file name : Image_30122020123357029.png
|
2020-12-30 12:33:57.145025 |
10 |
34202147 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur |
100000 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur1 |
Plinth level |
-
latitude : 24.42352729383856
Longitude : 87.83445384353399
file name : Image_30122020122116277.png
|
2020-12-30 12:21:16.384629 |
11 |
34202147 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur |
100000 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur1 |
Plinth level |
-
latitude : 24.423443097621202
Longitude : 87.83446582965553
file name : Image_30122020122113251.png
|
2020-12-30 12:21:13.40015 |
12 |
34202147 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur |
100000 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur2 |
Plinth level |
-
latitude : 24.421471380628645
Longitude : 87.8365184739232
file name : Image_11012021170709271.png
|
2021-01-11 17:07:09.350515 |
13 |
34202147 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur |
100000 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur2 |
Plinth level |
-
latitude : 24.422180824913085
Longitude : 87.83627129159868
file name : Image_11012021170153743.png
|
2021-01-11 17:01:53.827295 |
14 |
34202147 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur |
100000 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur2 |
Completion of work |
-
latitude : 24.422186692245305
Longitude : 87.83625771291554
file name : Image_11012021165059395.png
|
2021-01-11 16:50:59.506778 |
15 |
34202147 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur |
100000 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur3 |
Plinth level |
-
latitude : 24.4240482
Longitude : 87.8346576
file name : Image_11012021170913379.png
|
2021-01-11 17:09:13.467143 |
16 |
34202147 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur |
100000 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur3 |
Plinth level |
-
latitude : 24.42352213896811
Longitude : 87.8344641532749
file name : Image_11012021165954119.png
|
2021-01-11 16:59:54.232449 |
17 |
34202147 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur |
100000 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur3 |
Completion of work |
-
latitude : 24.4240479
Longitude : 87.8346573
file name : Image_11012021165353079.png
|
2021-01-11 16:53:53.186964 |
18 |
34202071 |
Instalation of street light within Sansad X at Kanakpur Sarduari |
125000 |
Instalation of street light within Sansad X at Kanakpur Sarduari1 |
Plinth level |
-
latitude : 24.430398736149073
Longitude : 87.80346821062267
file name : Image_13012021125325562.png
|
2021-01-13 12:53:25.680408 |
19 |
34202071 |
Instalation of street light within Sansad X at Kanakpur Sarduari |
125000 |
Instalation of street light within Sansad X at Kanakpur Sarduari1 |
Completion of work |
-
latitude : 24.4302920345217
Longitude : 87.80313435941935
file name : Image_13012021125142846.png
|
2021-01-13 12:51:42.943781 |
20 |
34202071 |
Instalation of street light within Sansad X at Kanakpur Sarduari |
125000 |
Instalation of street light within Sansad X at Kanakpur Sarduari1 |
Completion of work |
-
latitude : 24.430460217408836
Longitude : 87.803540462628
file name : Image_13012021122927657.png
|
2021-01-13 12:29:27.761086 |
21 |
34202071 |
Instalation of street light within Sansad X at Kanakpur Sarduari |
125000 |
Instalation of street light within Sansad X at Kanakpur Sarduari2 |
Plinth level |
-
latitude : 24.43041939754039
Longitude : 87.80350349843502
file name : Image_13012021125418743.png
|
2021-01-13 12:54:18.852115 |
22 |
34202071 |
Instalation of street light within Sansad X at Kanakpur Sarduari |
125000 |
Instalation of street light within Sansad X at Kanakpur Sarduari2 |
Completion of work |
-
latitude : 24.43025599233806
Longitude : 87.80313410796225
file name : Image_13012021125050863.png
|
2021-01-13 12:50:50.972875 |
23 |
34202071 |
Instalation of street light within Sansad X at Kanakpur Sarduari |
125000 |
Instalation of street light within Sansad X at Kanakpur Sarduari2 |
Completion of work |
-
latitude : 24.43037874531001
Longitude : 87.80354054644704
file name : Image_13012021123036956.png
|
2021-01-13 12:30:37.049301 |
24 |
34202071 |
Instalation of street light within Sansad X at Kanakpur Sarduari |
125000 |
Instalation of street light within Sansad X at Kanakpur Sarduari3 |
Plinth level |
-
latitude : 24.430097993463278
Longitude : 87.802739655599
file name : Image_13012021125825088.png
|
2021-01-13 12:58:25.193044 |
25 |
34202071 |
Instalation of street light within Sansad X at Kanakpur Sarduari |
125000 |
Instalation of street light within Sansad X at Kanakpur Sarduari3 |
Completion of work |
-
latitude : 24.430067441426218
Longitude : 87.80276019126177
file name : Image_13012021124554595.png
|
2021-01-13 12:45:54.704401 |
26 |
34202071 |
Instalation of street light within Sansad X at Kanakpur Sarduari |
125000 |
Instalation of street light within Sansad X at Kanakpur Sarduari3 |
Completion of work |
-
latitude : 24.430150254629552
Longitude : 87.80274267308414
file name : Image_13012021123508540.png
|
2021-01-13 12:35:08.661509 |
27 |
34202071 |
Instalation of street light within Sansad X at Kanakpur Sarduari |
125000 |
Instalation of street light within Sansad X at Kanakpur Sarduari4 |
Plinth level |
-
latitude : 24.43015624769032
Longitude : 87.80263613909483
file name : Image_13012021125923382.png
|
2021-01-13 12:59:23.491261 |
28 |
34202071 |
Instalation of street light within Sansad X at Kanakpur Sarduari |
125000 |
Instalation of street light within Sansad X at Kanakpur Sarduari4 |
Completion of work |
-
latitude : 24.43019933067262
Longitude : 87.802615435794
file name : Image_13012021124652489.png
|
2021-01-13 12:46:52.586713 |
29 |
34202071 |
Instalation of street light within Sansad X at Kanakpur Sarduari |
125000 |
Instalation of street light within Sansad X at Kanakpur Sarduari4 |
Completion of work |
-
latitude : 24.430195055902004
Longitude : 87.8026532381773
file name : Image_13012021123846645.png
|
2021-01-13 12:38:46.742997 |
30 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram1 |
Plinth level |
-
latitude : 24.45012252777815
Longitude : 87.84227784723043
file name : Image_14012021120823945.png
|
2021-01-14 12:08:24.030482 |
31 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram1 |
Plinth level |
-
latitude : 24.450138118118048
Longitude : 87.84229125827551
file name : Image_14012021115758732.png
|
2021-01-14 11:57:58.833736 |
32 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram1 |
Completion of work |
-
latitude : 24.45019079837948
Longitude : 87.84226343035698
file name : Image_14012021105958939.png
|
2021-01-14 10:59:59.052971 |
33 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram2 |
Plinth level |
-
latitude : 24.45019364822656
Longitude : 87.84213158302009
file name : Image_14012021120910767.png
|
2021-01-14 12:09:10.853272 |
34 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram2 |
Plinth level |
-
latitude : 24.450135184451938
Longitude : 87.84218229353428
file name : Image_14012021115852386.png
|
2021-01-14 11:58:52.501655 |
35 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram2 |
Completion of work |
-
latitude : 24.45014658384025
Longitude : 87.84221188165247
file name : Image_14012021110057157.png
|
2021-01-14 11:00:57.245919 |
36 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram3 |
Plinth level |
-
latitude : 24.450201778672636
Longitude : 87.84232813864946
file name : Image_14012021121020899.png
|
2021-01-14 12:10:20.980392 |
37 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram3 |
Plinth level |
-
latitude : 24.450238910503685
Longitude : 87.84221808426082
file name : Image_14012021120001625.png
|
2021-01-14 12:00:01.723604 |
38 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram3 |
Completion of work |
-
latitude : 24.450236395932734
Longitude : 87.842234428972
file name : Image_14012021110203498.png
|
2021-01-14 11:02:03.584389 |
39 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram4 |
Plinth level |
-
latitude : 24.45006959605962
Longitude : 87.84256199374795
file name : Image_14012021120731863.png
|
2021-01-14 12:07:31.950169 |
40 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram4 |
Plinth level |
-
latitude : 24.450083510018885
Longitude : 87.84253265708685
file name : Image_14012021120120190.png
|
2021-01-14 12:01:20.266245 |
41 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram4 |
Completion of work |
-
latitude : 24.450082881376147
Longitude : 87.84258278086782
file name : Image_14012021110926749.png
|
2021-01-14 11:09:26.819604 |
42 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram5 |
Plinth level |
-
latitude : 24.45003145840019
Longitude : 87.84262058325112
file name : Image_14012021120620830.png
|
2021-01-14 12:06:20.927784 |
43 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram5 |
Plinth level |
-
latitude : 24.45019679144025
Longitude : 87.84181424416602
file name : Image_14012021120220829.png
|
2021-01-14 12:02:20.950889 |
44 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram5 |
Completion of work |
-
latitude : 24.450053838081658
Longitude : 87.84259962849319
file name : Image_14012021110930583.png
|
2021-01-14 11:09:30.729316 |
45 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram6 |
Plinth level |
-
latitude : 24.450305504724383
Longitude : 87.84142104908824
file name : Image_14012021121208809.png
|
2021-01-14 12:12:08.88378 |
46 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram6 |
Plinth level |
-
latitude : 24.450297374278307
Longitude : 87.84143052063882
file name : Image_14012021115048437.png
|
2021-01-14 11:50:48.546268 |
47 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram6 |
Completion of work |
-
latitude : 24.450308228842914
Longitude : 87.84143161028624
file name : Image_14012021113738840.png
|
2021-01-14 11:37:38.938592 |
48 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram7 |
Plinth level |
-
latitude : 24.45029511116445
Longitude : 87.8413646388799
file name : Image_14012021121316523.png
|
2021-01-14 12:13:16.61292 |
49 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram7 |
Plinth level |
-
latitude : 24.450324741192162
Longitude : 87.84144678153098
file name : Image_14012021115135039.png
|
2021-01-14 11:51:35.124361 |
50 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram7 |
Completion of work |
-
latitude : 24.450285136699677
Longitude : 87.84141878597438
file name : Image_14012021113845264.png
|
2021-01-14 11:38:45.396374 |
51 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram8 |
Plinth level |
-
latitude : 24.450242933817208
Longitude : 87.84181541763246
file name : Image_14012021121413145.png
|
2021-01-14 12:14:13.253035 |
52 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram8 |
Completion of work |
-
latitude : 24.45027608424425
Longitude : 87.8413487970829
file name : Image_14012021114838354.png
|
2021-01-14 11:48:38.489053 |
53 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram8 |
Plinth level |
-
latitude : 24.450268079526722
Longitude : 87.84144334495068
file name : Image_14012021115232170.png
|
2021-01-14 11:52:32.276554 |
54 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram9 |
Plinth level |
-
latitude : 24.450278556905687
Longitude : 87.84136497415602
file name : Image_14012021121500635.png
|
2021-01-14 12:15:00.719217 |
55 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram9 |
Completion of work |
-
latitude : 24.450266528874636
Longitude : 87.84130956977606
file name : Image_14012021114841757.png
|
2021-01-14 11:48:41.864386 |
56 |
34201995 |
Up gradation of electrification by Instalation of Solar light at Dumurgram |
225000 |
Up gradation of electrification by Instalation of Solar light at Dumurgram9 |
Plinth level |
-
latitude : 24.45025475230068
Longitude : 87.84133044071496
file name : Image_14012021115323664.png
|
2021-01-14 11:53:23.759875 |
57 |
34067770 |
Upgradation of road from Mohor Morol house to towards Basir House at Dumurgram |
99502 |
Upgradation of road from Mohor Morol house to towards Basir House at Dumurgram 1 |
Roof laid |
-
latitude : 24.45120467338711,24.45121095981449
Longitude : 87.83545916900039,87.83551130443811
file name : Image_13012021152444139.png
|
2021-01-13 15:24:44.2434 |
58 |
34067770 |
Upgradation of road from Mohor Morol house to towards Basir House at Dumurgram |
99502 |
Upgradation of road from Mohor Morol house to towards Basir House at Dumurgram 1 |
Roof laid |
-
latitude : 24.45118422154337,24.451257647015154
Longitude : 87.83547224476933,87.83546503633261
file name : Image_13012021152307207.png
|
2021-01-13 15:23:07.303335 |
59 |
34067770 |
Upgradation of road from Mohor Morol house to towards Basir House at Dumurgram |
99502 |
Upgradation of road from Mohor Morol house to towards Basir House at Dumurgram 1 |
Plinth level |
-
latitude : 24.451186233200133,24.4512284360826
Longitude : 87.83544274047017,87.835479285568
file name : Image_13012021152013844.png
|
2021-01-13 15:20:13.938656 |
60 |
34067770 |
Upgradation of road from Mohor Morol house to towards Basir House at Dumurgram |
99502 |
Upgradation of road from Mohor Morol house to towards Basir House at Dumurgram 1 |
Completion of work |
-
latitude : 24.451074544340372,24.451267244294286
Longitude : 87.83551331609488,87.83550401218235
file name : Image_13012021111119541.png
|
2021-01-13 11:11:19.633001 |
61 |
34057807 |
Upgradation of road from Alauddin Sk house to Jaynal Abedin house at Moloypur |
199781 |
Upgradation of road from Alauddin Sk house to Jaynal Abedin house at Moloypur1 |
Plinth level |
-
latitude : 24.44444735068828,24.44439969956875
Longitude : 87.8027150966227,87.80277553014457
file name : Image_11012021125912097.png
|
2021-01-11 12:59:12.211916 |
62 |
34057807 |
Upgradation of road from Alauddin Sk house to Jaynal Abedin house at Moloypur |
199781 |
Upgradation of road from Alauddin Sk house to Jaynal Abedin house at Moloypur1 |
Completion of work |
-
latitude : 24.4444117275998,24.44437761325389
Longitude : 87.802744936198,87.8028501290828
file name : Image_11012021125627587.png
|
2021-01-11 12:56:27.705583 |
63 |
34057807 |
Upgradation of road from Alauddin Sk house to Jaynal Abedin house at Moloypur |
199781 |
Upgradation of road from Alauddin Sk house to Jaynal Abedin house at Moloypur1 |
Completion of work |
-
latitude : 24.44437518250197,24.444363699294627
Longitude : 87.80276957899332,87.80282154679298
file name : Image_11012021125239798.png
|
2021-01-11 12:52:39.937512 |
64 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur1 |
Roof laid |
-
latitude : 24.42088531795889
Longitude : 87.82033427618444
file name : Image_13012021141239757.png
|
2021-01-13 14:12:39.85174 |
65 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur1 |
Roof laid |
-
latitude : 24.42090677563101
Longitude : 87.82023889012635
file name : Image_13012021141357599.png
|
2021-01-13 14:13:57.701663 |
66 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur1 |
Plinth level |
-
latitude : 24.420901285484433
Longitude : 87.82023335807025
file name : Image_13012021135834618.png
|
2021-01-13 13:58:34.74569 |
67 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur1 |
Completion of work |
-
latitude : 24.420938459225
Longitude : 87.82027141191065
file name : Image_13012021130801826.png
|
2021-01-13 13:08:01.912936 |
68 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur1 |
Completion of work |
-
latitude : 24.420942314900458
Longitude : 87.82025691121817
file name : Image_13012021131030860.png
|
2021-01-13 13:10:30.953192 |
69 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur2 |
Roof laid |
-
latitude : 24.418753422796726
Longitude : 87.82413823530078
file name : Image_13012021142850144.png
|
2021-01-13 14:28:50.249048 |
70 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur2 |
Plinth level |
-
latitude : 24.418699736706913
Longitude : 87.82514632679522
file name : Image_13012021134328589.png
|
2021-01-13 13:43:28.695832 |
71 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur2 |
Completion of work |
-
latitude : 24.418700700625777
Longitude : 87.8251438960433
file name : Image_13012021133451587.png
|
2021-01-13 13:34:51.714442 |
72 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur2 |
Completion of work |
-
latitude : 24.4184706
Longitude : 87.8245067
file name : Image_13012021133459496.png
|
2021-01-13 13:34:59.626627 |
73 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur3 |
Roof laid |
-
latitude : 24.419695883989334
Longitude : 87.82267659902573
file name : Image_13012021141717761.png
|
2021-01-13 14:17:17.853901 |
74 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur3 |
Plinth level |
-
latitude : 24.4197727
Longitude : 87.8235043
file name : Image_13012021135535944.png
|
2021-01-13 13:55:36.063274 |
75 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur3 |
Completion of work |
-
latitude : 24.41967853344977
Longitude : 87.8227035049349
file name : Image_13012021131302210.png
|
2021-01-13 13:13:02.327353 |
76 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur3 |
Completion of work |
-
latitude : 24.418712896294892
Longitude : 87.82512939535081
file name : Image_13012021133455401.png
|
2021-01-13 13:34:55.521196 |
77 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur4 |
Roof laid |
-
latitude : 24.419568814337254
Longitude : 87.82271624542773
file name : Image_13012021141824730.png
|
2021-01-13 14:18:24.831505 |
78 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur4 |
Plinth level |
-
latitude : 24.419575687497854
Longitude : 87.82275941222906
file name : Image_13012021135620903.png
|
2021-01-13 13:56:21.015804 |
79 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur4 |
Completion of work |
-
latitude : 24.420763361267745
Longitude : 87.82061557285488
file name : Image_13012021131431696.png
|
2021-01-13 13:14:31.792574 |
80 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur5 |
Roof laid |
-
latitude : 24.41931237000972
Longitude : 87.82299284823239
file name : Image_13012021142051226.png
|
2021-01-13 14:20:51.317466 |
81 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur5 |
Plinth level |
-
latitude : 24.419012633152306
Longitude : 87.82331102527678
file name : Image_13012021135340867.png
|
2021-01-13 13:53:40.965883 |
82 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur5 |
Completion of work |
-
latitude : 24.4197727
Longitude : 87.8235043
file name : Image_13012021131659783.png
|
2021-01-13 13:16:59.88145 |
83 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur6 |
Roof laid |
-
latitude : 24.41933097783476
Longitude : 87.82300466671586
file name : Image_13012021142147597.png
|
2021-01-13 14:21:47.674732 |
84 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur6 |
Plinth level |
-
latitude : 24.4197727
Longitude : 87.8235043
file name : Image_13012021135105317.png
|
2021-01-13 13:51:05.42711 |
85 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur7 |
Roof laid |
-
latitude : 24.418903752230108
Longitude : 87.82357094809413
file name : Image_13012021142326726.png
|
2021-01-13 14:23:26.85166 |
86 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur7 |
Plinth level |
-
latitude : 24.418729785829782
Longitude : 87.8238784801215
file name : Image_13012021134923041.png
|
2021-01-13 13:49:23.149784 |
87 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur7 |
Completion of work |
-
latitude : 24.41888401284814
Longitude : 87.82357874326408
file name : Image_13012021131950656.png
|
2021-01-13 13:19:50.766802 |
88 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur8 |
Roof laid |
-
latitude : 24.41875773947686
Longitude : 87.8238576091826
file name : Image_13012021142430738.png
|
2021-01-13 14:24:30.81807 |
89 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur8 |
Plinth level |
-
latitude : 24.41882429178804
Longitude : 87.82390614040196
file name : Image_13012021134741482.png
|
2021-01-13 13:47:41.588754 |
90 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur8 |
Completion of work |
-
latitude : 24.418790764175355
Longitude : 87.82387747429311
file name : Image_13012021132110287.png
|
2021-01-13 13:21:10.381984 |
91 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur9 |
Roof laid |
-
latitude : 24.418302015401423
Longitude : 87.82494340091944
file name : Image_13012021142713464.png
|
2021-01-13 14:27:13.562889 |
92 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur9 |
Plinth level |
-
latitude : 24.41823131404817
Longitude : 87.82491959631443
file name : Image_13012021134544090.png
|
2021-01-13 13:45:44.199737 |
93 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur9 |
Completion of work |
-
latitude : 24.418261698447168
Longitude : 87.82491046003997
file name : Image_13012021133443069.png
|
2021-01-13 13:34:43.207961 |
94 |
34065074 |
Upgradation of road from Ainal House to Sajahan House at Baliara |
249920 |
Upgradation of road from Ainal House to Sajahan House at Baliara1 |
Roof laid |
-
latitude : 24.447762561030686,24.44773833733052
Longitude : 87.8267396427691,87.82673771493137
file name : Image_31082021103737144.png
|
2021-08-31 10:37:37.243815 |
95 |
34065074 |
Upgradation of road from Ainal House to Sajahan House at Baliara |
249920 |
Upgradation of road from Ainal House to Sajahan House at Baliara1 |
Roof laid |
-
latitude : 24.44778255186975,24.447784353978932
Longitude : 87.82672447152436,87.82669622451067
file name : Image_31082021103822381.png
|
2021-08-31 10:38:22.472636 |
96 |
34065074 |
Upgradation of road from Ainal House to Sajahan House at Baliara |
249920 |
Upgradation of road from Ainal House to Sajahan House at Baliara1 |
Completion of work |
-
latitude : 24.44773347582668,24.447740432806313
Longitude : 87.82743928022683,87.82743290998042
file name : Image_23082021123402386.png
|
2021-08-23 12:34:02.477912 |
97 |
34065074 |
Upgradation of road from Ainal House to Sajahan House at Baliara |
249920 |
Upgradation of road from Ainal House to Sajahan House at Baliara1 |
Completion of work |
-
latitude : 24.447695882990956,24.44771050941199
Longitude : 87.82742410898209,87.82748831436038
file name : Image_23082021123443743.png
|
2021-08-23 12:34:43.833292 |
98 |
34073922 |
Upgradation of road from Tohid Mondal house to Hanif Mondal house at Dhananjoypur |
99684 |
Upgradation of road from Tohid Mondal house to Hanif Mondal house at Dhananjoypur1 |
Roof laid |
-
latitude : 24.420926389284432,24.42091406788677
Longitude : 87.81999723985791,87.8200048673898
file name : Image_13012021141106419.png
|
2021-01-13 14:11:06.498991 |
99 |
34073922 |
Upgradation of road from Tohid Mondal house to Hanif Mondal house at Dhananjoypur |
99684 |
Upgradation of road from Tohid Mondal house to Hanif Mondal house at Dhananjoypur1 |
Completion of work |
-
latitude : 24.420986990444362,24.42091285251081
Longitude : 87.81998516991735,87.82002280466259
file name : Image_13012021140715300.png
|
2021-01-13 14:07:15.377594 |
100 |
34073922 |
Upgradation of road from Tohid Mondal house to Hanif Mondal house at Dhananjoypur |
99684 |
Upgradation of road from Tohid Mondal house to Hanif Mondal house at Dhananjoypur1 |
Completion of work |
-
latitude : 24.420929909683764,24.420925718732178
Longitude : 87.81997771002352,87.81997016631067
file name : Image_13012021140346735.png
|
2021-01-13 14:03:46.803142 |
101 |
34073922 |
Upgradation of road from Tohid Mondal house to Hanif Mondal house at Dhananjoypur |
99684 |
Upgradation of road from Tohid Mondal house to Hanif Mondal house at Dhananjoypur1 |
Completion of work |
-
latitude : 24.420903925783932,24.42092115059495
Longitude : 87.82000981271267,87.81998366117477
file name : Image_13012021140040242.png
|
2021-01-13 14:00:40.326365 |
102 |
34201894 |
Upgradation of road from Sobrati Sk House to Murselim House at Dumurgram |
150000 |
Upgradation of road from Sobrati Sk House to Murselim House at Dumurgram1 |
Plinth level |
-
latitude : 24.448097543790936,24.44810579996556
Longitude : 87.84028454683721,87.84029267728329
file name : Image_13012021155344851.png
|
2021-01-13 15:53:44.9685 |
103 |
34201894 |
Upgradation of road from Sobrati Sk House to Murselim House at Dumurgram |
150000 |
Upgradation of road from Sobrati Sk House to Murselim House at Dumurgram1 |
Completion of work |
-
latitude : 24.448107853531837,24.448103536851704
Longitude : 87.84024414606392,87.84029619768262
file name : Image_13012021155218261.png
|
2021-01-13 15:52:18.37904 |
104 |
34201894 |
Upgradation of road from Sobrati Sk House to Murselim House at Dumurgram |
150000 |
Upgradation of road from Sobrati Sk House to Murselim House at Dumurgram1 |
Completion of work |
-
latitude : 24.448097879067063,24.448059699498117
Longitude : 87.84024288877845,87.84028907306492
file name : Image_13012021155005554.png
|
2021-01-13 15:50:05.669283 |
105 |
34189530 |
Upgradation of road from Moid house to towards Kabarstan at Singhanagar |
150000 |
Upgradation of road from Moid house to towards Kabarstan at Singhanagar1 |
Plinth level |
-
latitude : 24.416140490211546,24.416110860183835
Longitude : 87.83919992856681,87.8391245752573
file name : Image_11012021164002886.png
|
2021-01-11 16:40:02.98753 |
106 |
34189530 |
Upgradation of road from Moid house to towards Kabarstan at Singhanagar |
150000 |
Upgradation of road from Moid house to towards Kabarstan at Singhanagar1 |
Completion of work |
-
latitude : 24.41612842027098,24.416151344776154
Longitude : 87.83918584696949,87.8391330409795
file name : Image_11012021163841689.png
|
2021-01-11 16:38:41.789689 |
107 |
34189530 |
Upgradation of road from Moid house to towards Kabarstan at Singhanagar |
150000 |
Upgradation of road from Moid house to towards Kabarstan at Singhanagar1 |
Completion of work |
-
latitude : 24.41617699339986,24.416114925406873
Longitude : 87.83922147005796,87.83910722471774
file name : Image_11012021163630993.png
|
2021-01-11 16:36:31.089609 |
108 |
34072808 |
Upgradation of road from Enaul house to towards Saidul house at Bhushna Ganeshpur |
97243 |
Upgradation of road from Enaul house to towards Saidul house at Bhushna Ganeshpur1 |
Roof laid |
-
latitude : 24.41505901515484,24.415072007104754
Longitude : 87.82193815335631,87.82188702374697
file name : Image_14012021154636001.png
|
2021-01-14 15:46:36.105781 |
109 |
34072808 |
Upgradation of road from Enaul house to towards Saidul house at Bhushna Ganeshpur |
97243 |
Upgradation of road from Enaul house to towards Saidul house at Bhushna Ganeshpur1 |
Plinth level |
-
latitude : 24.415077287703753,24.41506052389741
Longitude : 87.82199280336499,87.821937315166
file name : Image_14012021154352519.png
|
2021-01-14 15:43:52.6206 |
110 |
34072808 |
Upgradation of road from Enaul house to towards Saidul house at Bhushna Ganeshpur |
97243 |
Upgradation of road from Enaul house to towards Saidul house at Bhushna Ganeshpur1 |
Completion of work |
-
latitude : 24.41499677952379,24.41505989525467
Longitude : 87.82203764654696,87.82195961102843
file name : Image_14012021154012321.png
|
2021-01-14 15:40:12.41796 |
111 |
34187553 |
Upgradation of road from Odud Sk house to main road at Dhananjoypur |
100000 |
Upgradation of road from Odud Sk house to main road at Dhananjoypur1 |
Roof laid |
-
latitude : 24.417179,24.417069498449564
Longitude : 87.8238114,87.826332366094
file name : Image_11012021133810784.png
|
2021-01-11 13:38:10.871559 |
112 |
34187553 |
Upgradation of road from Odud Sk house to main road at Dhananjoypur |
100000 |
Upgradation of road from Odud Sk house to main road at Dhananjoypur1 |
Plinth level |
-
latitude : 24.416914810426533,24.417050471529365
Longitude : 87.8262718487531,87.82633513212204
file name : Image_11012021133536921.png
|
2021-01-11 13:35:37.038154 |
113 |
34187553 |
Upgradation of road from Odud Sk house to main road at Dhananjoypur |
100000 |
Upgradation of road from Odud Sk house to main road at Dhananjoypur1 |
Completion of work |
-
latitude : 24.41691321786493,24.41704120952636,24.417044227011502,24.417043053545058
Longitude : 87.82625407911837,87.82633035443723,87.82633060589433,87.82632440328598
file name : Image_11012021133232373.png
|
2021-01-11 13:32:32.45646 |
114 |
34191824 |
Upgradation of road from Ajijul Islam house to towards Ruhul Sk house at Bahadurpur |
100000 |
Upgradation of road from Ajijul Islam house to towards Ruhul Sk house at Bahadurpur1 |
Completion of work |
-
latitude : 24.417132949456573,24.41711396444589
Longitude : 87.84123564139009,87.84133639186621
file name : Image_11012021162748814.png
|
2021-01-11 16:27:48.911898 |
115 |
34191824 |
Upgradation of road from Ajijul Islam house to towards Ruhul Sk house at Bahadurpur |
100000 |
Upgradation of road from Ajijul Islam house to towards Ruhul Sk house at Bahadurpur1 |
Plinth level |
-
latitude : 24.4171203346923,24.4171203346923,24.417102397419512
Longitude : 87.84126858226955,87.84126858226955,87.84134770743549
file name : Image_11012021162915291.png
|
2021-01-11 16:29:15.381321 |
116 |
34191824 |
Upgradation of road from Ajijul Islam house to towards Ruhul Sk house at Bahadurpur |
100000 |
Upgradation of road from Ajijul Islam house to towards Ruhul Sk house at Bahadurpur1 |
Completion of work |
-
latitude : 24.417133536189795,24.417108725756407
Longitude : 87.84123195335269,87.84135902300477
file name : Image_11012021162413536.png
|
2021-01-11 16:24:13.623131 |
117 |
34202147 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur |
100000 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur4 |
Plinth level |
-
latitude : 24.423604533076286
Longitude : 87.8344726189971
file name : Image_11012021171002390.png
|
2021-01-11 17:10:02.471822 |
118 |
34202147 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur |
100000 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur4 |
Plinth level |
-
latitude : 24.423623601906
Longitude : 87.83445660956204
file name : Image_11012021165853536.png
|
2021-01-11 16:58:53.645049 |
119 |
34202147 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur |
100000 |
Up gradation of electrification by Instalation of Solar light at Bahadurpur4 |
Completion of work |
-
latitude : 24.42366488277912
Longitude : 87.83453397452831
file name : Image_11012021165512559.png
|
2021-01-11 16:55:12.66609 |
120 |
34202071 |
Instalation of street light within Sansad X at Kanakpur Sarduari |
125000 |
Instalation of street light within Sansad X at Kanakpur Sarduari5 |
Plinth level |
-
latitude : 24.429014967754483
Longitude : 87.80353643931448
file name : Image_13012021130124089.png
|
2021-01-13 13:01:24.163935 |
121 |
34202071 |
Instalation of street light within Sansad X at Kanakpur Sarduari |
125000 |
Instalation of street light within Sansad X at Kanakpur Sarduari5 |
Completion of work |
-
latitude : 24.429055494256318
Longitude : 87.80358874239028
file name : Image_13012021124053553.png
|
2021-01-13 12:40:53.651074 |
122 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur1 |
Plinth level |
-
latitude : 24.43141110241413
Longitude : 87.80093436129391
file name : Image_13012021121930276.png
|
2021-01-13 12:19:30.382291 |
123 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur1 |
Completion of work |
-
latitude : 24.431425938382745
Longitude : 87.8009277395904
file name : Image_13012021121743842.png
|
2021-01-13 12:17:43.938061 |
124 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur1 |
Completion of work |
-
latitude : 24.432515292428434
Longitude : 87.80255793593824
file name : Image_13012021113159709.png
|
2021-01-13 11:31:59.800836 |
125 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur1 |
Completion of work |
-
latitude : 24.43143126089126
Longitude : 87.80093813315034
file name : Image_13012021120058729.png
|
2021-01-13 12:00:58.81372 |
126 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur2 |
Plinth level |
-
latitude : 24.43201086949557
Longitude : 87.80107886530459
file name : Image_13012021122048730.png
|
2021-01-13 12:20:48.825259 |
127 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur2 |
Completion of work |
-
latitude : 24.43227879703045
Longitude : 87.80108213424683
file name : Image_13012021121623904.png
|
2021-01-13 12:16:24.016335 |
128 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur2 |
Completion of work |
-
latitude : 24.432089952751994
Longitude : 87.80102404765785
file name : Image_13012021120259947.png
|
2021-01-13 12:03:00.045147 |
129 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur3 |
Plinth level |
-
latitude : 24.43215352948755
Longitude : 87.80103385448456
file name : Image_13012021122128529.png
|
2021-01-13 12:21:28.619347 |
130 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur3 |
Completion of work |
-
latitude : 24.432328334078193
Longitude : 87.80109571292996
file name : Image_13012021121501595.png
|
2021-01-13 12:15:01.697475 |
131 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur3 |
Completion of work |
-
latitude : 24.43211417645216
Longitude : 87.80101952143013
file name : Image_13012021120408969.png
|
2021-01-13 12:04:09.047836 |
132 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur4 |
Plinth level |
-
latitude : 24.43252262659371
Longitude : 87.80121230520308
file name : Image_13012021122237170.png
|
2021-01-13 12:22:37.261171 |
133 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur4 |
Completion of work |
-
latitude : 24.432519609108567
Longitude : 87.80122948810458
file name : Image_13012021121255886.png
|
2021-01-13 12:12:55.971124 |
134 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur4 |
Completion of work |
-
latitude : 24.432526440359652
Longitude : 87.8012097068131
file name : Image_13012021120601889.png
|
2021-01-13 12:06:01.977852 |
135 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur5 |
Plinth level |
-
latitude : 24.43261386360973
Longitude : 87.80127818696201
file name : Image_13012021122441230.png
|
2021-01-13 12:24:41.326989 |
136 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur5 |
Completion of work |
-
latitude : 24.43262681365013
Longitude : 87.80123258940876
file name : Image_13012021121203923.png
|
2021-01-13 12:12:04.027202 |
137 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur5 |
Completion of work |
-
latitude : 24.432596848346293
Longitude : 87.80125547200441
file name : Image_13012021120715547.png
|
2021-01-13 12:07:15.621258 |
138 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur6 |
Roof laid |
-
latitude : 24.429857642389834
Longitude : 87.80294853262603
file name : Image_13012021124301030.png
|
2021-01-13 12:43:01.135693 |
139 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur6 |
Plinth level |
-
latitude : 24.432538468390703
Longitude : 87.8025083988905
file name : Image_13012021122615182.png
|
2021-01-13 12:26:15.287003 |
140 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur6 |
Completion of work |
-
latitude : 24.432560303248465
Longitude : 87.80252574943006
file name : Image_13012021120858843.png
|
2021-01-13 12:08:58.921543 |
141 |
34202034 |
Instalation of street light within Sansad IX at Kanakpur |
150000 |
Instalation of street light within Sansad IX at Kanakpur6 |
Completion of work |
-
latitude : 24.43252543453127
Longitude : 87.80257176607847
file name : Image_13012021121021324.png
|
2021-01-13 12:10:21.402255 |
142 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur10 |
Roof laid |
-
latitude : 24.4179477
Longitude : 87.8256543
file name : Image_13012021142621550.png
|
2021-01-13 14:26:21.64685 |
143 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur10 |
Plinth level |
-
latitude : 24.418224901892245
Longitude : 87.82496703788638
file name : Image_13012021134445874.png
|
2021-01-13 13:44:45.981315 |
144 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur10 |
Completion of work |
-
latitude : 24.418278001248837
Longitude : 87.82502437010407
file name : Image_13012021133447383.png
|
2021-01-13 13:34:47.491637 |
145 |
34202112 |
Instalation of street light within Sansad XII at Dhananjoypur |
250000 |
Instalation of street light within Sansad XII at Dhananjoypur10 |
Completion of work |
-
latitude : 24.418300590477884
Longitude : 87.82505764625967
file name : Image_13012021133610442.png
|
2021-01-13 13:36:10.536555 |
146 |
34067575 |
Upgradation of drain from Abdul Alim house to Ripon house at Dumurgram |
149635 |
Upgradation of drain from Abdul Alim house to Ripon house at Dumurgram 1 |
Roof laid |
-
latitude : 24.45082811638713,24.450815124437213
Longitude : 87.8363424539566,87.83632912673056
file name : Image_10032021125154101.png
|
2021-03-10 12:51:54.213594 |
147 |
34067575 |
Upgradation of drain from Abdul Alim house to Ripon house at Dumurgram |
149635 |
Upgradation of drain from Abdul Alim house to Ripon house at Dumurgram 1 |
Plinth level |
-
latitude : 24.45081797428429,24.4508288288489
Longitude : 87.83631420694292,87.83632577396929
file name : Image_10032021124842657.png
|
2021-03-10 12:48:42.768248 |
148 |
34067575 |
Upgradation of drain from Abdul Alim house to Ripon house at Dumurgram |
149635 |
Upgradation of drain from Abdul Alim house to Ripon house at Dumurgram 1 |
Completion of work |
-
latitude : 24.450810933485627,24.450799408368766
Longitude : 87.8363551106304,87.83636977896094
file name : Image_10032021124538977.png
|
2021-03-10 12:45:39.085117 |
149 |
34069619 |
Upgradation of Drain from Kartik Konaihouse to towards Main road house at Kanakpur |
100000 |
Upgradation of Drain from Kartik Konaihouse to towards Main road house at Kanakpur1 |
Roof laid |
-
latitude : 24.428871679119766,24.428855627775192
Longitude : 87.80351389199495,87.80347298830748
file name : Image_09022021133804482.png
|
2021-02-09 13:38:04.58699 |
150 |
34069619 |
Upgradation of Drain from Kartik Konaihouse to towards Main road house at Kanakpur |
100000 |
Upgradation of Drain from Kartik Konaihouse to towards Main road house at Kanakpur1 |
Completion of work |
-
latitude : 24.428853867575526,24.428860656917095
Longitude : 87.80346075072885,87.8034563921392
file name : Image_09022021133546212.png
|
2021-02-09 13:35:46.334365 |
151 |
34069619 |
Upgradation of Drain from Kartik Konaihouse to towards Main road house at Kanakpur |
100000 |
Upgradation of Drain from Kartik Konaihouse to towards Main road house at Kanakpur1 |
Completion of work |
-
latitude : 24.428842677734792,24.428847203962505
Longitude : 87.80345538631082,87.80341557227075
file name : Image_09022021133410084.png
|
2021-02-09 13:34:10.214025 |
152 |
34193497 |
Upgradation of road from Dhiren Mal house to Sluice gate house at Tapna |
198749 |
Upgradation of road from Dhiren Mal house to Sluice gate house at Tapna1 |
Completion of work |
-
latitude : 24.407662404701114,24.407672840170562
Longitude : 87.83851294778287,87.8384976927191
file name : Image_08082021112938284.png
|
2021-08-08 11:29:38.376804 |
153 |
34193497 |
Upgradation of road from Dhiren Mal house to Sluice gate house at Tapna |
198749 |
Upgradation of road from Dhiren Mal house to Sluice gate house at Tapna1 |
Completion of work |
-
latitude : 24.407726526260376,24.407728160731494
Longitude : 87.83850263804197,87.838502721861
file name : Image_08082021112941003.png
|
2021-08-08 11:29:41.093916 |
154 |
34193497 |
Upgradation of road from Dhiren Mal house to Sluice gate house at Tapna |
198749 |
Upgradation of road from Dhiren Mal house to Sluice gate house at Tapna1 |
Completion of work |
-
latitude : 24.407792910933495,24.407780086621642
Longitude : 87.83857413567603,87.83858050592244
file name : Image_08082021112943802.png
|
2021-08-08 11:29:43.89195 |
155 |
34193497 |
Upgradation of road from Dhiren Mal house to Sluice gate house at Tapna |
198749 |
Upgradation of road from Dhiren Mal house to Sluice gate house at Tapna1 |
Completion of work |
-
latitude : 24.407726526260376,24.407728160731494
Longitude : 87.83850263804197,87.838502721861
file name : Image_08082021112946833.png
|
2021-08-08 11:29:46.924023 |
156 |
34193497 |
Upgradation of road from Dhiren Mal house to Sluice gate house at Tapna |
198749 |
Upgradation of road from Dhiren Mal house to Sluice gate house at Tapna1 |
Completion of work |
-
latitude : 24.407792910933495,24.407780086621642
Longitude : 87.83857413567603,87.83858050592244
file name : Image_08082021112949561.png
|
2021-08-08 11:29:49.647178 |
157 |
34064486 |
Upgradation of Drain from Hai Momin house to Kolimoddin house at Baliara |
199097 |
Upgradation of Drain from Hai Momin house to Kolimoddin house at Baliara1 |
Roof laid |
-
latitude : 24.44560983683914,24.44558351766318
Longitude : 87.82590907998383,87.825893657282
file name : Image_01032021124433168.png
|
2021-03-01 12:44:33.25335 |
158 |
34064486 |
Upgradation of Drain from Hai Momin house to Kolimoddin house at Baliara |
199097 |
Upgradation of Drain from Hai Momin house to Kolimoddin house at Baliara1 |
Roof laid |
-
latitude : 24.445594917051494,24.445573543198407
Longitude : 87.82594302669168,87.82588661648333
file name : Image_01032021124155213.png
|
2021-03-01 12:41:55.311273 |
159 |
34064486 |
Upgradation of Drain from Hai Momin house to Kolimoddin house at Baliara |
199097 |
Upgradation of Drain from Hai Momin house to Kolimoddin house at Baliara1 |
Completion of work |
-
latitude : 24.44552484434098,24.445559293963015,24.44560405332595
Longitude : 87.82593062147498,87.82593095675111,87.82596046105027
file name : Image_22022021115854597.png
|
2021-02-22 11:58:54.710001 |
160 |
34064486 |
Upgradation of Drain from Hai Momin house to Kolimoddin house at Baliara |
199097 |
Upgradation of Drain from Hai Momin house to Kolimoddin house at Baliara1 |
Completion of work |
-
latitude : 24.44554810412228,24.445568094961345
Longitude : 87.82591100782156,87.82594000920653
file name : Image_22022021120047235.png
|
2021-02-22 12:00:47.349122 |
161 |
34064486 |
Upgradation of Drain from Hai Momin house to Kolimoddin house at Baliara |
199097 |
Upgradation of Drain from Hai Momin house to Kolimoddin house at Baliara1 |
Completion of work |
-
latitude : 24.4455531751737,24.44558980409056
Longitude : 87.82593715935946,87.82588728703558
file name : Image_22022021115310809.png
|
2021-02-22 11:53:10.91219 |
162 |
34064486 |
Upgradation of Drain from Hai Momin house to Kolimoddin house at Baliara |
199097 |
Upgradation of Drain from Hai Momin house to Kolimoddin house at Baliara1 |
Completion of work |
-
latitude : 24.44551097229123,24.445560425519943
Longitude : 87.825928023085,87.8259142767638
file name : Image_22022021115152689.png
|
2021-02-22 11:51:52.786091 |
163 |
34064362 |
Upgradation of Drain from Abul Kalam house to Bib pukur at Baliara |
199121 |
Upgradation of Drain from Abul Kalam house to Bib pukur at Baliara1 |
Plinth level |
-
latitude : 24.44852912798524,24.448563368059695
Longitude : 87.82357002608478,87.82357254065573
file name : Image_01032021122021358.png
|
2021-03-01 12:20:21.443861 |
164 |
34064362 |
Upgradation of Drain from Abul Kalam house to Bib pukur at Baliara |
199121 |
Upgradation of Drain from Abul Kalam house to Bib pukur at Baliara1 |
Completion of work |
-
latitude : 24.44852485321462,24.448518524877727
Longitude : 87.82355058006942,87.82357731834054
file name : Image_01032021121830078.png
|
2021-03-01 12:18:30.161944 |
165 |
34064362 |
Upgradation of Drain from Abul Kalam house to Bib pukur at Baliara |
199121 |
Upgradation of Drain from Abul Kalam house to Bib pukur at Baliara1 |
Completion of work |
-
latitude : 24.44851362146437,24.44856806192547
Longitude : 87.82356935553253,87.82352803274989
file name : Image_01032021121545079.png
|
2021-03-01 12:15:45.162133 |
166 |
34068769 |
Upgradation of Drain with slab from Semim house to Tapan house at Dumurgram |
299398 |
Upgradation of Drain with slab from Semim house to Tapan house at Dumurgram1 |
Plinth level |
-
latitude : 24.450072655454278,24.450087449513376
Longitude : 87.83730721101165,87.83737166784704
file name : Image_01032021125752044.png
|
2021-03-01 12:57:52.145216 |
167 |
34068769 |
Upgradation of Drain with slab from Semim house to Tapan house at Dumurgram |
299398 |
Upgradation of Drain with slab from Semim house to Tapan house at Dumurgram1 |
Plinth level |
-
latitude : 24.4502083,24.4500594958663
Longitude : 87.8376145,87.83725365065038
file name : Image_01032021125608010.png
|
2021-03-01 12:56:08.113966 |
168 |
34068769 |
Upgradation of Drain with slab from Semim house to Tapan house at Dumurgram |
299398 |
Upgradation of Drain with slab from Semim house to Tapan house at Dumurgram1 |
Plinth level |
-
latitude : 24.450055765919387,24.450055765919387
Longitude : 87.83731726929545,87.83731726929545
file name : Image_01032021125323428.png
|
2021-03-01 12:53:23.520476 |
169 |
34068769 |
Upgradation of Drain with slab from Semim house to Tapan house at Dumurgram |
299398 |
Upgradation of Drain with slab from Semim house to Tapan house at Dumurgram1 |
Completion of work |
-
latitude : 24.450058196671307,24.450036738999188
Longitude : 87.83739228732884,87.83746680244803
file name : Image_23022021114147082.png
|
2021-02-23 11:41:47.215475 |
170 |
34064852 |
Upgradation of road from Abu Huraya house to towards Abdul Ohab house via Abdul Khalek |
99502 |
Upgradation of road from Abu Huraya house to towards Abdul Ohab house via Abdul Khalek 1 |
Plinth level |
-
latitude : 24.43375493399799,24.433765369467437
Longitude : 87.79961085878313,87.79961697757244
file name : Image_08082021123229359.png
|
2021-08-08 12:32:29.458548 |
171 |
34064852 |
Upgradation of road from Abu Huraya house to towards Abdul Ohab house via Abdul Khalek |
99502 |
Upgradation of road from Abu Huraya house to towards Abdul Ohab house via Abdul Khalek 1 |
Plinth level |
-
latitude : 24.43373913411051,24.43373913411051
Longitude : 87.79962217435241,87.79962217435241
file name : Image_08082021123322434.png
|
2021-08-08 12:33:22.530171 |
172 |
34064852 |
Upgradation of road from Abu Huraya house to towards Abdul Ohab house via Abdul Khalek |
99502 |
Upgradation of road from Abu Huraya house to towards Abdul Ohab house via Abdul Khalek 1 |
Completion of work |
-
latitude : 24.43378862924874,24.433737290091813
Longitude : 87.79963164590299,87.79962661676109
file name : Image_26072021122818482.png
|
2021-07-26 12:28:18.572856 |
173 |
56806587 |
Installation of Six numbers Solar Street Light within Sansad VII at Dumurgram |
149925 |
Installation of Six numbers Solar Street Light within Sansad VII at Dumurgram1 |
Completion of work |
-
latitude : 24.45039812475443
Longitude : 87.83406542614102
file name : Image_19052023111502341.png
|
2023-05-19 11:15:02.474933 |
174 |
56806587 |
Installation of Six numbers Solar Street Light within Sansad VII at Dumurgram |
149925 |
Installation of Six numbers Solar Street Light within Sansad VII at Dumurgram1 |
Completion of work |
-
latitude : 24.4606041
Longitude : 87.8234711
file name : Image_19052023111425208.png
|
2023-05-19 11:14:25.331252 |
175 |
56806587 |
Installation of Six numbers Solar Street Light within Sansad VII at Dumurgram |
149925 |
Installation of Six numbers Solar Street Light within Sansad VII at Dumurgram1 |
Completion of work |
-
latitude : 24.4606046
Longitude : 87.8234684
file name : Image_19052023111336065.png
|
2023-05-19 11:13:36.253273 |
176 |
34066177 |
Upgradation of drain from Bashi house to Kabil Choto kandar at Dumurgram |
100000 |
Upgradation of drain from Bashi house to Kabil Choto kandar at Dumurgram 1 |
Completion of work |
-
latitude : 24.451524107716978,24.451528885401785
Longitude : 87.841652976349,87.84164191223681
file name : Image_31082021102823247.png
|
2021-08-31 10:28:23.332402 |
177 |
34066177 |
Upgradation of drain from Bashi house to Kabil Choto kandar at Dumurgram |
100000 |
Upgradation of drain from Bashi house to Kabil Choto kandar at Dumurgram 1 |
Completion of work |
-
latitude : 24.45154359564185,24.451508475467563
Longitude : 87.84168147481978,87.84164291806519
file name : Image_31082021102913199.png
|
2021-08-31 10:29:13.290823 |
178 |
34066177 |
Upgradation of drain from Bashi house to Kabil Choto kandar at Dumurgram |
100000 |
Upgradation of drain from Bashi house to Kabil Choto kandar at Dumurgram 1 |
Completion of work |
-
latitude : 24.451506715267897,24.451514719985425
Longitude : 87.8416564129293,87.84164878539741
file name : Image_31082021103002437.png
|
2021-08-31 10:30:02.52526 |
179 |
34066177 |
Upgradation of drain from Bashi house to Kabil Choto kandar at Dumurgram |
100000 |
Upgradation of drain from Bashi house to Kabil Choto kandar at Dumurgram 1 |
Completion of work |
-
latitude : 24.451509481295943,24.451490873470902
Longitude : 87.84161408431828,87.84163537435234
file name : Image_03062021104647962.png
|
2021-06-03 10:46:48.069801 |
180 |
46725105 |
Installation of Solar Pump near Chunia para masjid within Sansad VI |
450000 |
Installation of Solar Pump near Chunia para masjid within Sansad VI1 |
Completion of work |
-
latitude : 24.451978825964034
Longitude : 87.84255310893059
file name : Image_23022022113118516.png
|
2022-02-23 11:31:18.613851 |
181 |
46725105 |
Installation of Solar Pump near Chunia para masjid within Sansad VI |
450000 |
Installation of Solar Pump near Chunia para masjid within Sansad VI1 |
Completion of work |
-
latitude : 24.451978825964034
Longitude : 87.84255310893059
file name : Image_23022022113133203.png
|
2022-02-23 11:31:33.29465 |
182 |
46725105 |
Installation of Solar Pump near Chunia para masjid within Sansad VI |
450000 |
Installation of Solar Pump near Chunia para masjid within Sansad VI1 |
Completion of work |
-
latitude : 24.451910303905606
Longitude : 87.8425193298608
file name : Image_23022022113215543.png
|
2022-02-23 11:32:15.629765 |
183 |
46725105 |
Installation of Solar Pump near Chunia para masjid within Sansad VI |
450000 |
Installation of Solar Pump near Chunia para masjid within Sansad VI1 |
Completion of work |
-
latitude : 24.451949363574386
Longitude : 87.84254321828485
file name : Image_23022022113259318.png
|
2022-02-23 11:32:59.417719 |
184 |
46725105 |
Installation of Solar Pump near Chunia para masjid within Sansad VI |
450000 |
Installation of Solar Pump near Chunia para masjid within Sansad VI1 |
Completion of work |
-
latitude : 24.45191290229559
Longitude : 87.84251304343343
file name : Image_23022022113345741.png
|
2022-02-23 11:33:45.833405 |
185 |
46725105 |
Installation of Solar Pump near Chunia para masjid within Sansad VI |
450000 |
Installation of Solar Pump near Chunia para masjid within Sansad VI1 |
Completion of work |
-
latitude : 24.451916213147342
Longitude : 87.84251220524311
file name : Image_23022022113414387.png
|
2022-02-23 11:34:14.472912 |
186 |
34069221 |
Upgradation of road from Kanakpur natun para main road to towards Khayer sk house at Kanakpur |
99502 |
Upgradation of road from Kanakpur natun para main road to towards Khayer sk house at Kanakpur1 |
Plinth level |
-
latitude : 24.41657186485827,24.41657186485827,24.41657186485827
Longitude : 87.80421763658524,87.80421763658524,87.80421763658524
file name : Image_08082021122328366.png
|
2021-08-08 12:23:28.457014 |
187 |
34069221 |
Upgradation of road from Kanakpur natun para main road to towards Khayer sk house at Kanakpur |
99502 |
Upgradation of road from Kanakpur natun para main road to towards Khayer sk house at Kanakpur1 |
Plinth level |
-
latitude : 24.416590724140406,24.416589634492993
Longitude : 87.8041919041425,87.80418855138123
file name : Image_08082021122420300.png
|
2021-08-08 12:24:20.391297 |
188 |
34069221 |
Upgradation of road from Kanakpur natun para main road to towards Khayer sk house at Kanakpur |
99502 |
Upgradation of road from Kanakpur natun para main road to towards Khayer sk house at Kanakpur1 |
Completion of work |
-
latitude : 24.416599231772125,24.41658552736044
Longitude : 87.80422065407038,87.80423783697188
file name : Image_26072021122653632.png
|
2021-07-26 12:26:53.713799 |
189 |
34073590 |
Upgradation of road with culvert from Chaku house toSonil Mal house at Bhushna Ganeshpur |
111951 |
Upgradation of road with culvert from Chaku house toSonil Mal house at Bhushna Ganeshpur1 |
Completion of work |
-
latitude : 24.413765938952565,24.41387150902301
Longitude : 87.81666903756559,87.816730896011
file name : Image_28102021131753142.png
|
2021-10-28 13:17:53.245479 |
190 |
34073590 |
Upgradation of road with culvert from Chaku house toSonil Mal house at Bhushna Ganeshpur |
111951 |
Upgradation of road with culvert from Chaku house toSonil Mal house at Bhushna Ganeshpur1 |
Completion of work |
-
latitude : 24.413842801004648,24.413768285885453
Longitude : 87.81673056073487,87.81669401563704
file name : Image_28102021131837064.png
|
2021-10-28 13:18:37.156147 |
191 |
34073590 |
Upgradation of road with culvert from Chaku house toSonil Mal house at Bhushna Ganeshpur |
111951 |
Upgradation of road with culvert from Chaku house toSonil Mal house at Bhushna Ganeshpur1 |
Completion of work |
-
latitude : 24.41377821844071,24.413774572312832
Longitude : 87.81670063734055,87.81670181080699
file name : Image_28102021131936436.png
|
2021-10-28 13:19:36.535336 |
192 |
34073590 |
Upgradation of road with culvert from Chaku house toSonil Mal house at Bhushna Ganeshpur |
111951 |
Upgradation of road with culvert from Chaku house toSonil Mal house at Bhushna Ganeshpur1 |
Completion of work |
-
latitude : 24.413767070509493,24.41375717986375
Longitude : 87.8167015593499,87.81666702590883
file name : Image_28102021132023284.png
|
2021-10-28 13:20:23.386673 |
193 |
47187507 |
Construction of CC road from Dulal house to Kalu house at Bahadurpur |
100000 |
Construction of CC road from Dulal house to Kalu house at Bahadurpur 1 |
Completion of work |
-
latitude : 24.42275381181389,24.4227715395391
Longitude : 87.83453623764217,87.83450053073466
file name : Image_27012022163143452.png
|
2022-01-27 16:31:43.578507 |
194 |
47187507 |
Construction of CC road from Dulal house to Kalu house at Bahadurpur |
100000 |
Construction of CC road from Dulal house to Kalu house at Bahadurpur 1 |
Completion of work |
-
latitude : 24.422765336930752,24.422753392718732
Longitude : 87.83452643081546,87.83450639806688
file name : Image_27012022163236959.png
|
2022-01-27 16:32:37.103733 |
195 |
47187507 |
Construction of CC road from Dulal house to Kalu house at Bahadurpur |
100000 |
Construction of CC road from Dulal house to Kalu house at Bahadurpur 1 |
Completion of work |
-
latitude : 24.42278335802257,24.42280075047165
Longitude : 87.8345209825784,87.83457303419709
file name : Image_27012022163336612.png
|
2022-01-27 16:33:36.734493 |
196 |
47187507 |
Construction of CC road from Dulal house to Kalu house at Bahadurpur |
100000 |
Construction of CC road from Dulal house to Kalu house at Bahadurpur 1 |
Completion of work |
-
latitude : 24.422749034129083,24.422800038009882
Longitude : 87.83451947383583,87.8345154505223
file name : Image_27012022163306818.png
|
2022-01-27 16:33:06.963061 |
197 |
46978247 |
Construction of CC road from Tinmatha towards Samir Sk house at Moloypur |
250000 |
Construction of CC road from Tinmatha towards Samir Sk house at Moloypur1 |
Completion of work |
-
latitude : 24.44353736937046,24.443581122905016
Longitude : 87.80466330237687,87.8047286812216
file name : Image_26012022115859586.png
|
2022-01-26 11:58:59.718652 |
198 |
46978247 |
Construction of CC road from Tinmatha towards Samir Sk house at Moloypur |
250000 |
Construction of CC road from Tinmatha towards Samir Sk house at Moloypur1 |
Completion of work |
-
latitude : 24.443559665232897,24.44356662221253
Longitude : 87.80480227433145,87.80481040477753
file name : Image_26012022120058650.png
|
2022-01-26 12:00:58.767255 |
199 |
46978247 |
Construction of CC road from Tinmatha towards Samir Sk house at Moloypur |
250000 |
Construction of CC road from Tinmatha towards Samir Sk house at Moloypur1 |
Completion of work |
-
latitude : 24.443677053786814,24.443695535883307
Longitude : 87.80524726957083,87.80522757209837
file name : Image_27012022123210256.png
|
2022-01-27 12:32:10.378995 |
200 |
46978247 |
Construction of CC road from Tinmatha towards Samir Sk house at Moloypur |
250000 |
Construction of CC road from Tinmatha towards Samir Sk house at Moloypur1 |
Completion of work |
-
latitude : 24.443674623034894,24.44363573100418
Longitude : 87.80528272502124,87.80521768145263
file name : Image_27012022123244668.png
|
2022-01-27 12:32:44.812989 |
201 |
46997249 |
Construction of culvert near Moid house at Ganeshpur |
100000 |
Construction of culvert near Moid house at Ganeshpur1 |
Completion of work |
-
latitude : 24.41476690582931,24.4147563027218,24.414771893061697
Longitude : 87.8178113233298,87.8178134188056,87.81777368858457
file name : Image_11022022152950146.png
|
2022-02-11 15:29:50.252048 |
202 |
46997249 |
Construction of culvert near Moid house at Ganeshpur |
100000 |
Construction of culvert near Moid house at Ganeshpur1 |
Completion of work |
-
latitude : 24.414766863919795,24.414746328257024
Longitude : 87.81784476712346,87.81784912571311
file name : Image_11022022153032741.png
|
2022-02-11 15:30:32.836806 |
203 |
46997249 |
Construction of culvert near Moid house at Ganeshpur |
100000 |
Construction of culvert near Moid house at Ganeshpur1 |
Completion of work |
-
latitude : 24.414753830060363,24.414772856980562
Longitude : 87.8178049530834,87.8178464435041
file name : Image_11022022153113951.png
|
2022-02-11 15:31:14.066862 |
204 |
47188299 |
Construction of CC road from Rejaul house to Palash Pukur and Ahasan house to Nurul Absar house at T |
250000 |
Construction of CC road from Rejaul house to Palash Pukur and Ahasan house to Nurul Absar house at T1 |
Completion of work |
-
latitude : 24.404344093054533,24.404336591251194
Longitude : 87.83527971245348,87.83529513515532
file name : Image_24012022173401381.png
|
2022-01-24 17:34:01.509118 |
205 |
47188299 |
Construction of CC road from Rejaul house to Palash Pukur and Ahasan house to Nurul Absar house at T |
250000 |
Construction of CC road from Rejaul house to Palash Pukur and Ahasan house to Nurul Absar house at T1 |
Completion of work |
-
latitude : 24.404352558776736,24.40436588600278
Longitude : 87.83526898361742,87.83521207049489
file name : Image_24012022173436531.png
|
2022-01-24 17:34:36.631225 |
206 |
47188299 |
Construction of CC road from Rejaul house to Palash Pukur and Ahasan house to Nurul Absar house at T |
250000 |
Construction of CC road from Rejaul house to Palash Pukur and Ahasan house to Nurul Absar house at T1 |
Completion of work |
-
latitude : 24.404332316480577,24.40434128511697
Longitude : 87.83528700470924,87.83526630140841
file name : Image_24012022173506384.png
|
2022-01-24 17:35:06.483602 |
207 |
47188299 |
Construction of CC road from Rejaul house to Palash Pukur and Ahasan house to Nurul Absar house at T |
250000 |
Construction of CC road from Rejaul house to Palash Pukur and Ahasan house to Nurul Absar house at T1 |
Completion of work |
-
latitude : 24.40435637254268,24.4043683167547
Longitude : 87.83524207770824,87.83523830585182
file name : Image_24012022173534790.png
|
2022-01-24 17:35:34.899968 |
208 |
46997428 |
Construction of road protection wall with road near Bhushna Kabarstan at Bhushna |
150000 |
Construction of road protection wall with road near Bhushna Kabarstan at Bhushna1 |
Completion of work |
-
latitude : 24.412730899639428,24.412757512181997
Longitude : 87.8196021169424,87.81961167231202
file name : Image_11022022151005251.png
|
2022-02-11 15:10:05.35683 |
209 |
46997428 |
Construction of road protection wall with road near Bhushna Kabarstan at Bhushna |
150000 |
Construction of road protection wall with road near Bhushna Kabarstan at Bhushna1 |
Completion of work |
-
latitude : 24.41273483913392,24.41270751412958
Longitude : 87.81962977722287,87.81963966786861
file name : Image_11022022151049906.png
|
2022-02-11 15:10:50.009943 |
210 |
46997428 |
Construction of road protection wall with road near Bhushna Kabarstan at Bhushna |
150000 |
Construction of road protection wall with road near Bhushna Kabarstan at Bhushna1 |
Completion of work |
-
latitude : 24.412708897143602,24.412687229923904
Longitude : 87.81961661763489,87.81958292238414
file name : Image_11022022151128090.png
|
2022-02-11 15:11:28.260407 |
211 |
46997428 |
Construction of road protection wall with road near Bhushna Kabarstan at Bhushna |
150000 |
Construction of road protection wall with road near Bhushna Kabarstan at Bhushna1 |
Completion of work |
-
latitude : 24.412690582685173,24.412743053399026
Longitude : 87.81960429623723,87.81959306448698
file name : Image_11022022151200609.png
|
2022-02-11 15:12:00.712995 |
212 |
46802929 |
Construction of CC road with drain with slab from Main road to Haru Sk house at Dhananjoypur |
125000 |
Construction of CC road with drain with slab from Main road to Haru Sk house at Dhananjoypur1 |
Completion of work |
-
latitude : 24.419112587347627,24.419109234586358
Longitude : 87.82273259013891,87.82270669005811
file name : Image_23022022113103500.png
|
2022-02-23 11:31:03.59285 |
213 |
46802929 |
Construction of CC road with drain with slab from Main road to Haru Sk house at Dhananjoypur |
125000 |
Construction of CC road with drain with slab from Main road to Haru Sk house at Dhananjoypur1 |
Completion of work |
-
latitude : 24.419087693095207,24.419128471054137
Longitude : 87.82269445247948,87.82275136560202
file name : Image_23022022113107477.png
|
2022-02-23 11:31:07.566836 |
214 |
46802929 |
Construction of CC road with drain with slab from Main road to Haru Sk house at Dhananjoypur |
125000 |
Construction of CC road with drain with slab from Main road to Haru Sk house at Dhananjoypur1 |
Completion of work |
-
latitude : 24.41912075970322,24.41910475026816
Longitude : 87.82270333729684,87.8227537125349
file name : Image_23022022113111146.png
|
2022-02-23 11:31:11.231904 |
215 |
46802929 |
Construction of CC road with drain with slab from Main road to Haru Sk house at Dhananjoypur |
125000 |
Construction of CC road with drain with slab from Main road to Haru Sk house at Dhananjoypur1 |
Completion of work |
-
latitude : 24.419109150767326,24.419076796621084
Longitude : 87.82274214550853,87.82277290709317
file name : Image_23022022113114838.png
|
2022-02-23 11:31:14.927665 |
216 |
46802929 |
Construction of CC road with drain with slab from Main road to Haru Sk house at Dhananjoypur |
125000 |
Construction of CC road with drain with slab from Main road to Haru Sk house at Dhananjoypur1 |
Completion of work |
-
latitude : 24.419087693095207,24.419128471054137
Longitude : 87.82269445247948,87.82275136560202
file name : Image_23022022113122318.png
|
2022-02-23 11:31:22.406984 |
217 |
46802929 |
Construction of CC road with drain with slab from Main road to Haru Sk house at Dhananjoypur |
125000 |
Construction of CC road with drain with slab from Main road to Haru Sk house at Dhananjoypur1 |
Completion of work |
-
latitude : 24.41912075970322,24.41910475026816
Longitude : 87.82270333729684,87.8227537125349
file name : Image_23022022113125818.png
|
2022-02-23 11:31:25.915504 |
218 |
46802929 |
Construction of CC road with drain with slab from Main road to Haru Sk house at Dhananjoypur |
125000 |
Construction of CC road with drain with slab from Main road to Haru Sk house at Dhananjoypur1 |
Completion of work |
-
latitude : 24.419109150767326,24.419076796621084
Longitude : 87.82274214550853,87.82277290709317
file name : Image_23022022113129454.png
|
2022-02-23 11:31:29.574867 |
219 |
47187385 |
Construction of CC road from Bariul house to Kawsar house at Bahadurpur Guthingadanga |
150000 |
Construction of CC road from Bariul house to Kawsar house at Bahadurpur Guthingadanga1 |
Completion of work |
-
latitude : 24.427270903252065,24.427335360087454
Longitude : 87.83507527783513,87.8346660733223
file name : Image_27012022161440298.png
|
2022-01-27 16:14:40.398213 |
220 |
47187385 |
Construction of CC road from Bariul house to Kawsar house at Bahadurpur Guthingadanga |
150000 |
Construction of CC road from Bariul house to Kawsar house at Bahadurpur Guthingadanga1 |
Completion of work |
-
latitude : 24.427325259894133,24.427339928224683
Longitude : 87.83466699533165,87.83470245078206
file name : Image_27012022161522998.png
|
2022-01-27 16:15:23.12008 |
221 |
47187385 |
Construction of CC road from Bariul house to Kawsar house at Bahadurpur Guthingadanga |
150000 |
Construction of CC road from Bariul house to Kawsar house at Bahadurpur Guthingadanga1 |
Completion of work |
-
latitude : 24.427330079488456,24.42734147887677
Longitude : 87.83469800837338,87.83468392677605
file name : Image_27012022161605946.png
|
2022-01-27 16:16:06.07139 |
222 |
47187385 |
Construction of CC road from Bariul house to Kawsar house at Bahadurpur Guthingadanga |
150000 |
Construction of CC road from Bariul house to Kawsar house at Bahadurpur Guthingadanga1 |
Completion of work |
-
latitude : 24.42733976058662,24.427338670939207
Longitude : 87.83470035530627,87.83470270223916
file name : Image_27012022161642825.png
|
2022-01-27 16:16:42.957026 |
223 |
46724988 |
Construction of pucca drain with slab from Nasim Sk house towards Nazrul Sk house at Dumurgram |
100000 |
Construction of pucca drain with slab from Nasim Sk house towards Nazrul Sk house at Dumurgram1 |
Completion of work |
-
latitude : 24.450194695964456,24.450200060382485
Longitude : 87.84228069707751,87.84241304732859
file name : Image_02022022150821795.png
|
2022-02-02 15:08:21.913415 |
224 |
46724988 |
Construction of pucca drain with slab from Nasim Sk house towards Nazrul Sk house at Dumurgram |
100000 |
Construction of pucca drain with slab from Nasim Sk house towards Nazrul Sk house at Dumurgram1 |
Completion of work |
-
latitude : 24.450141764245927,24.450107817538083
Longitude : 87.84225848503411,87.84227625466883
file name : Image_08022022115049572.png
|
2022-02-08 11:50:49.681109 |
225 |
46724988 |
Construction of pucca drain with slab from Nasim Sk house towards Nazrul Sk house at Dumurgram |
100000 |
Construction of pucca drain with slab from Nasim Sk house towards Nazrul Sk house at Dumurgram1 |
Completion of work |
-
latitude : 24.450095370411873,24.450154504738748
Longitude : 87.84225680865347,87.84224800765514
file name : Image_08022022115127449.png
|
2022-02-08 11:51:27.550014 |
226 |
46724988 |
Construction of pucca drain with slab from Nasim Sk house towards Nazrul Sk house at Dumurgram |
100000 |
Construction of pucca drain with slab from Nasim Sk house towards Nazrul Sk house at Dumurgram1 |
Completion of work |
-
latitude : 24.450125000439584,24.450152283534408
Longitude : 87.84222696907818,87.84221800044179
file name : Image_08022022115205756.png
|
2022-02-08 11:52:05.861373 |
227 |
46724988 |
Construction of pucca drain with slab from Nasim Sk house towards Nazrul Sk house at Dumurgram |
100000 |
Construction of pucca drain with slab from Nasim Sk house towards Nazrul Sk house at Dumurgram1 |
Completion of work |
-
latitude : 24.450107272714376,24.450145661830902
Longitude : 87.84221833571792,87.84225353971124
file name : Image_08022022115234796.png
|
2022-02-08 11:52:34.906081 |
228 |
46724988 |
Construction of pucca drain with slab from Nasim Sk house towards Nazrul Sk house at Dumurgram |
100000 |
Construction of pucca drain with slab from Nasim Sk house towards Nazrul Sk house at Dumurgram1 |
Completion of work |
-
latitude : 24.450130029581487,24.450163431465626
Longitude : 87.84223509952426,87.84225085750222
file name : Image_08022022115338381.png
|
2022-02-08 11:53:38.508444 |
229 |
46803536 |
Construction of Pucca drain with slab from Pry. School to Sadananda Mondal house at Bahadurpur |
100000 |
Construction of Pucca drain with slab from Pry. School to Sadananda Mondal house at Bahadurpur 1 |
Completion of work |
-
latitude : 24.417976085096598,24.417995866388083
Longitude : 87.8400728199631,87.84003510139883
file name : Image_27012022162355070.png
|
2022-01-27 16:23:55.214122 |
230 |
46803536 |
Construction of Pucca drain with slab from Pry. School to Sadananda Mondal house at Bahadurpur |
100000 |
Construction of Pucca drain with slab from Pry. School to Sadananda Mondal house at Bahadurpur 1 |
Completion of work |
-
latitude : 24.41797323524952,24.417964098975062
Longitude : 87.84011523239315,87.84007508307695
file name : Image_27012022162431993.png
|
2022-01-27 16:24:32.130333 |
231 |
46803536 |
Construction of Pucca drain with slab from Pry. School to Sadananda Mondal house at Bahadurpur |
100000 |
Construction of Pucca drain with slab from Pry. School to Sadananda Mondal house at Bahadurpur 1 |
Completion of work |
-
latitude : 24.41796158440411,24.417970469221473
Longitude : 87.84010073170066,87.84006192348897
file name : Image_27012022162503375.png
|
2022-01-27 16:25:03.505204 |
232 |
46803536 |
Construction of Pucca drain with slab from Pry. School to Sadananda Mondal house at Bahadurpur |
100000 |
Construction of Pucca drain with slab from Pry. School to Sadananda Mondal house at Bahadurpur 1 |
Completion of work |
-
latitude : 24.417943605221808,24.41798496991396
Longitude : 87.8400641027838,87.84006452187896
file name : Image_27012022162534486.png
|
2022-01-27 16:25:34.605015 |
233 |
46803091 |
Construction of pucca drain with slab from Jala land to Pagla river and Mozaffar Sk house to Rabbeku |
200000 |
Construction of pucca drain with slab from Jala land to Pagla river and Mozaffar Sk house to Rabbeku1 |
Completion of work |
-
latitude : 24.421544931828976,24.41641847603023
Longitude : 87.82444451004267,87.82752837985754
file name : Image_24012022170353554.png
|
2022-01-24 17:03:53.665652 |
234 |
46803091 |
Construction of pucca drain with slab from Jala land to Pagla river and Mozaffar Sk house to Rabbeku |
200000 |
Construction of pucca drain with slab from Jala land to Pagla river and Mozaffar Sk house to Rabbeku1 |
Completion of work |
-
latitude : 24.416417009197176,24.416445046663284
Longitude : 87.8275409527123,87.82752636820078
file name : Image_24012022170433752.png
|
2022-01-24 17:04:33.845606 |
235 |
46803091 |
Construction of pucca drain with slab from Jala land to Pagla river and Mozaffar Sk house to Rabbeku |
200000 |
Construction of pucca drain with slab from Jala land to Pagla river and Mozaffar Sk house to Rabbeku1 |
Completion of work |
-
latitude : 24.416424385271966,24.416449782438576
Longitude : 87.82752594910562,87.82751681283116
file name : Image_24012022170505730.png
|
2022-01-24 17:05:05.833164 |
236 |
46803091 |
Construction of pucca drain with slab from Jala land to Pagla river and Mozaffar Sk house to Rabbeku |
200000 |
Construction of pucca drain with slab from Jala land to Pagla river and Mozaffar Sk house to Rabbeku1 |
Completion of work |
-
latitude : 24.41640816628933,24.416432180441916
Longitude : 87.82753231935203,87.82756811007857
file name : Image_24012022170538648.png
|
2022-01-24 17:05:38.756971 |
237 |
46802787 |
Construction of pucca drain with slab from Mira Singha house towards Rabindranath Singha land at Sar |
100000 |
Construction of pucca drain with slab from Mira Singha house towards Rabindranath Singha land at Sar1 |
Completion of work |
-
latitude : 24.427412850782275,24.42737576086074
Longitude : 87.80141497962177,87.80148119665682
file name : Image_18022022164107264.png
|
2022-02-18 16:41:07.399854 |
238 |
46802787 |
Construction of pucca drain with slab from Mira Singha house towards Rabindranath Singha land at Sar |
100000 |
Construction of pucca drain with slab from Mira Singha house towards Rabindranath Singha land at Sar1 |
Completion of work |
-
latitude : 24.42736867815256,24.42739478778094
Longitude : 87.80140332877636,87.80142788775265
file name : Image_18022022164158046.png
|
2022-02-18 16:41:58.161283 |
239 |
46802787 |
Construction of pucca drain with slab from Mira Singha house towards Rabindranath Singha land at Sar |
100000 |
Construction of pucca drain with slab from Mira Singha house towards Rabindranath Singha land at Sar1 |
Completion of work |
-
latitude : 24.42739478778094,24.42742818966508
Longitude : 87.80142788775265,87.80140492133796
file name : Image_18022022164238524.png
|
2022-02-18 16:42:38.620454 |
240 |
46802787 |
Construction of pucca drain with slab from Mira Singha house towards Rabindranath Singha land at Sar |
100000 |
Construction of pucca drain with slab from Mira Singha house towards Rabindranath Singha land at Sar1 |
Completion of work |
-
latitude : 24.427402541041374,24.42740509752184
Longitude : 87.80136946588755,87.80133116059005
file name : Image_18022022164314359.png
|
2022-02-18 16:43:14.457513 |
241 |
46802457 |
Construction of pucca drain witrh slab from Abdul Aziz shop towards Nurul Amin shop at Kanakpur |
100000 |
Construction of pucca drain witrh slab from Abdul Aziz shop towards Nurul Amin shop at Kanakpur1 |
Completion of work |
-
latitude : 24.430844821035862,24.430849431082606
Longitude : 87.80000363476574,87.80007798224688
file name : Image_18022022164827134.png
|
2022-02-18 16:48:27.240442 |
242 |
46802457 |
Construction of pucca drain witrh slab from Abdul Aziz shop towards Nurul Amin shop at Kanakpur |
100000 |
Construction of pucca drain witrh slab from Abdul Aziz shop towards Nurul Amin shop at Kanakpur1 |
Completion of work |
-
latitude : 24.430830697529018,24.430837696418166
Longitude : 87.80008401721716,87.80009675770998
file name : Image_18022022164857572.png
|
2022-02-18 16:48:57.676129 |
243 |
46802457 |
Construction of pucca drain witrh slab from Abdul Aziz shop towards Nurul Amin shop at Kanakpur |
100000 |
Construction of pucca drain witrh slab from Abdul Aziz shop towards Nurul Amin shop at Kanakpur1 |
Completion of work |
-
latitude : 24.430843563750386,24.430837528780103
Longitude : 87.80010958202183,87.80010715126991
file name : Image_18022022164932841.png
|
2022-02-18 16:49:32.948684 |
244 |
46802457 |
Construction of pucca drain witrh slab from Abdul Aziz shop towards Nurul Amin shop at Kanakpur |
100000 |
Construction of pucca drain witrh slab from Abdul Aziz shop towards Nurul Amin shop at Kanakpur1 |
Completion of work |
-
latitude : 24.430837780237198,24.430854627862573
Longitude : 87.80010723508894,87.80012802220881
file name : Image_18022022165006644.png
|
2022-02-18 16:50:06.744948 |
245 |
46802151 |
Construction of pucca drain with slab from Bamni Pukur towards Firoz house with slab at Dumurgram |
150000 |
Construction of pucca drain with slab from Bamni Pukur towards Firoz house with slab at Dumurgram1 |
Completion of work |
-
latitude : 24.449785156175494,24.449837082065642
Longitude : 87.83678602427244,87.83677831292152
file name : Image_08022022112612216.png
|
2022-02-08 11:26:12.314375 |
246 |
46802151 |
Construction of pucca drain with slab from Bamni Pukur towards Firoz house with slab at Dumurgram |
150000 |
Construction of pucca drain with slab from Bamni Pukur towards Firoz house with slab at Dumurgram1 |
Completion of work |
-
latitude : 24.44977296050638,24.4498012913391
Longitude : 87.83672156743705,87.83673238009214
file name : Image_08022022112701063.png
|
2022-02-08 11:27:01.160342 |
247 |
46802151 |
Construction of pucca drain with slab from Bamni Pukur towards Firoz house with slab at Dumurgram |
150000 |
Construction of pucca drain with slab from Bamni Pukur towards Firoz house with slab at Dumurgram1 |
Completion of work |
-
latitude : 24.449765752069652,24.44980774540454
Longitude : 87.83674738369882,87.83679851330817
file name : Image_08022022114944079.png
|
2022-02-08 11:49:44.185196 |
248 |
46802151 |
Construction of pucca drain with slab from Bamni Pukur towards Firoz house with slab at Dumurgram |
150000 |
Construction of pucca drain with slab from Bamni Pukur towards Firoz house with slab at Dumurgram1 |
Completion of work |
-
latitude : 24.449793831445277,24.449776061810553
Longitude : 87.8367896284908,87.8367275185883
file name : Image_08022022114948860.png
|
2022-02-08 11:49:48.958001 |
249 |
46802151 |
Construction of pucca drain with slab from Bamni Pukur towards Firoz house with slab at Dumurgram |
150000 |
Construction of pucca drain with slab from Bamni Pukur towards Firoz house with slab at Dumurgram1 |
Completion of work |
-
latitude : 24.449776941910386,24.449750958010554
Longitude : 87.83674478530884,87.83672257326543
file name : Image_08022022114954112.png
|
2022-02-08 11:49:54.206976 |
250 |
46725267 |
Construction of pucca drain with slab from Kalam house towards Moyin house at Dumurgram |
100000 |
Construction of pucca drain with slab from Kalam house towards Moyin house at Dumurgram1 |
Completion of work |
-
latitude : 24.450067,24.45018300320953
Longitude : 87.8359057,87.83622368238866
file name : Image_01022022105639006.png
|
2022-02-01 10:56:39.113172 |
251 |
46725267 |
Construction of pucca drain with slab from Kalam house towards Moyin house at Dumurgram |
100000 |
Construction of pucca drain with slab from Kalam house towards Moyin house at Dumurgram1 |
Completion of work |
-
latitude : 24.4500624,24.4500418
Longitude : 87.8359551,87.8359834
file name : Image_01022022105728040.png
|
2022-02-01 10:57:28.139659 |
252 |
46725267 |
Construction of pucca drain with slab from Kalam house towards Moyin house at Dumurgram |
100000 |
Construction of pucca drain with slab from Kalam house towards Moyin house at Dumurgram1 |
Completion of work |
-
latitude : 24.4500704,24.4500654
Longitude : 87.835956,87.8359929
file name : Image_25012022133625084.png
|
2022-01-25 13:36:25.213856 |
253 |
46725267 |
Construction of pucca drain with slab from Kalam house towards Moyin house at Dumurgram |
100000 |
Construction of pucca drain with slab from Kalam house towards Moyin house at Dumurgram1 |
Completion of work |
-
latitude : 24.450074,24.4501148
Longitude : 87.8359469,87.8364073
file name : Image_25012022133730931.png
|
2022-01-25 13:37:31.082654 |
254 |
46725187 |
Construction of pucca drain with slab from Sajal house towards Atahar house at Dumurgram |
150000 |
Construction of pucca drain with slab from Sajal house towards Atahar house at Dumurgram1 |
Completion of work |
-
latitude : 24.45077216718346,24.450856572948396
Longitude : 87.8353690635413,87.8354721609503
file name : Image_01022022104148001.png
|
2022-02-01 10:41:48.108161 |
255 |
46725187 |
Construction of pucca drain with slab from Sajal house towards Atahar house at Dumurgram |
150000 |
Construction of pucca drain with slab from Sajal house towards Atahar house at Dumurgram1 |
Completion of work |
-
latitude : 24.450830505229533,24.450775268487632
Longitude : 87.8354341071099,87.83534148707986
file name : Image_01022022104220696.png
|
2022-02-01 10:42:20.78969 |
256 |
46725187 |
Construction of pucca drain with slab from Sajal house towards Atahar house at Dumurgram |
150000 |
Construction of pucca drain with slab from Sajal house towards Atahar house at Dumurgram1 |
Completion of work |
-
latitude : 24.450555201619864,24.450606498867273
Longitude : 87.83529899083078,87.83521835692227
file name : Image_25012022132512087.png
|
2022-01-25 13:25:12.204757 |
257 |
46725187 |
Construction of pucca drain with slab from Sajal house towards Atahar house at Dumurgram |
150000 |
Construction of pucca drain with slab from Sajal house towards Atahar house at Dumurgram1 |
Completion of work |
-
latitude : 24.450610731728375,24.45060519967228
Longitude : 87.8352234698832,87.83518533222377
file name : Image_25012022132600861.png
|
2022-01-25 13:26:00.983315 |
258 |
46724827 |
Installation of Tubewell within Sansad III |
100000 |
Installation of Tubewell within Sansad III1 |
Completion of work |
-
latitude : 24.444374009035528
Longitude : 87.82452983781695
file name : Image_23022022115317001.png
|
2022-02-23 11:53:17.101467 |
259 |
46724827 |
Installation of Tubewell within Sansad III |
100000 |
Installation of Tubewell within Sansad III1 |
Completion of work |
-
latitude : 24.444388216361403
Longitude : 87.82456780783832
file name : Image_23022022115352568.png
|
2022-02-23 11:53:52.666041 |
260 |
46724827 |
Installation of Tubewell within Sansad III |
100000 |
Installation of Tubewell within Sansad III1 |
Completion of work |
-
latitude : 24.444396891631186
Longitude : 87.82451902516186
file name : Image_23022022115418076.png
|
2022-02-23 11:54:18.175182 |
261 |
46724827 |
Installation of Tubewell within Sansad III |
100000 |
Installation of Tubewell within Sansad III1 |
Completion of work |
-
latitude : 24.444401627406478
Longitude : 87.82453805208206
file name : Image_23022022115443091.png
|
2022-02-23 11:54:43.242668 |
262 |
46803648 |
Installation of Tubewell within Sansad XVI |
100000 |
Installation of Tubewell within Sansad XVI1 |
Completion of work |
-
latitude : 24.418746968731284
Longitude : 87.84023593179882
file name : Image_23022022123227388.png
|
2022-02-23 12:32:27.491843 |
263 |
46803648 |
Installation of Tubewell within Sansad XVI |
100000 |
Installation of Tubewell within Sansad XVI1 |
Completion of work |
-
latitude : 24.41875245887786
Longitude : 87.84019167535007
file name : Image_23022022123305739.png
|
2022-02-23 12:33:05.832448 |
264 |
46803648 |
Installation of Tubewell within Sansad XVI |
100000 |
Installation of Tubewell within Sansad XVI1 |
Completion of work |
-
latitude : 24.41872383467853
Longitude : 87.84019108861685
file name : Image_23022022123342154.png
|
2022-02-23 12:33:42.249403 |
265 |
46803648 |
Installation of Tubewell within Sansad XVI |
100000 |
Installation of Tubewell within Sansad XVI1 |
Completion of work |
-
latitude : 24.418718134984374
Longitude : 87.84024096094072
file name : Image_23022022123421351.png
|
2022-02-23 12:34:21.444838 |
266 |
46719430 |
Installation of Tubewell within Sansad II |
100000 |
Installation of Tubewell within Sansad II1 |
Completion of work |
-
latitude : 24.4456171290949
Longitude : 87.822574255988
file name : Image_23022022114735741.png
|
2022-02-23 11:47:35.846108 |
267 |
46719430 |
Installation of Tubewell within Sansad II |
100000 |
Installation of Tubewell within Sansad II1 |
Completion of work |
-
latitude : 24.445592192932963
Longitude : 87.82257350161672
file name : Image_23022022114804343.png
|
2022-02-23 11:48:04.440816 |
268 |
46719430 |
Installation of Tubewell within Sansad II |
100000 |
Installation of Tubewell within Sansad II1 |
Completion of work |
-
latitude : 24.445575680583715
Longitude : 87.8225930314511
file name : Image_23022022114853815.png
|
2022-02-23 11:48:53.920361 |
269 |
46719430 |
Installation of Tubewell within Sansad II |
100000 |
Installation of Tubewell within Sansad II1 |
Completion of work |
-
latitude : 24.445574171841145
Longitude : 87.82258599065244
file name : Image_23022022114925294.png
|
2022-02-23 11:49:25.39152 |
270 |
47187771 |
Construction of CC road from Sujalpur Masjid to Janif house at Sujalpur |
150000 |
Construction of CC road from Sujalpur Masjid to Janif house at Sujalpur 1 |
Completion of work |
-
latitude : 24.423590409569442,24.423547787591815
Longitude : 87.83986494876444,87.83985740505159
file name : Image_02022022150825010.png
|
2022-02-02 15:08:25.127379 |
271 |
47187771 |
Construction of CC road from Sujalpur Masjid to Janif house at Sujalpur |
150000 |
Construction of CC road from Sujalpur Masjid to Janif house at Sujalpur 1 |
Completion of work |
-
latitude : 24.423590409569442,24.423547787591815
Longitude : 87.83986494876444,87.83985740505159
file name : Image_02022022150828402.png
|
2022-02-02 15:08:28.490672 |
272 |
47187771 |
Construction of CC road from Sujalpur Masjid to Janif house at Sujalpur |
150000 |
Construction of CC road from Sujalpur Masjid to Janif house at Sujalpur 1 |
Completion of work |
-
latitude : 24.42358173429966,24.423569245263934
Longitude : 87.83985279500484,87.83980091102421
file name : Image_02022022150859273.png
|
2022-02-02 15:08:59.374213 |
273 |
47187771 |
Construction of CC road from Sujalpur Masjid to Janif house at Sujalpur |
150000 |
Construction of CC road from Sujalpur Masjid to Janif house at Sujalpur 1 |
Completion of work |
-
latitude : 24.42372812423855,24.42373026162386
Longitude : 87.83964517526329,87.83967493101954
file name : Image_29012022122754941.png
|
2022-01-29 12:27:55.114314 |
274 |
47187771 |
Construction of CC road from Sujalpur Masjid to Janif house at Sujalpur |
150000 |
Construction of CC road from Sujalpur Masjid to Janif house at Sujalpur 1 |
Completion of work |
-
latitude : 24.423730010166764,24.423714042641222
Longitude : 87.83972287550569,87.83976654522121
file name : Image_29012022122905346.png
|
2022-01-29 12:29:05.521951 |
275 |
47187906 |
Construction of Pucca ghat at Niamot Pukur near Boitala at Singhanagar |
200000 |
Construction of Pucca ghat at Niamot Pukur near Boitala at Singhanagar1 |
Completion of work |
-
latitude : 24.41811132710427
Longitude : 87.83723621629179
file name : Image_17052022163358954.png
|
2022-05-17 16:33:59.090165 |
276 |
47187906 |
Construction of Pucca ghat at Niamot Pukur near Boitala at Singhanagar |
200000 |
Construction of Pucca ghat at Niamot Pukur near Boitala at Singhanagar1 |
Completion of work |
-
latitude : 24.418176161125302
Longitude : 87.83725507557392
file name : Image_17052022163431379.png
|
2022-05-17 16:34:31.496313 |
277 |
47187906 |
Construction of Pucca ghat at Niamot Pukur near Boitala at Singhanagar |
200000 |
Construction of Pucca ghat at Niamot Pukur near Boitala at Singhanagar1 |
Completion of work |
-
latitude : 24.41818244755268
Longitude : 87.8372317738831
file name : Image_17052022163506531.png
|
2022-05-17 16:35:06.636429 |
278 |
46994348 |
Construction of pucca ghat at Dighi pukur at Dumurgram Dighapara |
200000 |
Construction of pucca ghat at Dighi pukur at Dumurgram Dighapara1 |
Completion of work |
-
latitude : 24.448506790213287
Longitude : 87.8403027355671
file name : Image_03062022130532236.png
|
2022-06-03 13:05:32.324081 |
279 |
46994348 |
Construction of pucca ghat at Dighi pukur at Dumurgram Dighapara |
200000 |
Construction of pucca ghat at Dighi pukur at Dumurgram Dighapara1 |
Completion of work |
-
latitude : 24.448534743860364
Longitude : 87.84027691930532
file name : Image_03062022130615619.png
|
2022-06-03 13:06:15.705502 |
280 |
46994348 |
Construction of pucca ghat at Dighi pukur at Dumurgram Dighapara |
200000 |
Construction of pucca ghat at Dighi pukur at Dumurgram Dighapara1 |
Completion of work |
-
latitude : 24.448549915105104
Longitude : 87.84029368311167
file name : Image_03062022130833033.png
|
2022-06-03 13:08:33.115093 |
281 |
46994348 |
Construction of pucca ghat at Dighi pukur at Dumurgram Dighapara |
200000 |
Construction of pucca ghat at Dighi pukur at Dumurgram Dighapara1 |
Completion of work |
-
latitude : 24.448537845164537
Longitude : 87.84025562927127
file name : Image_03062022130917332.png
|
2022-06-03 13:09:17.419562 |
282 |
46808469 |
Maintenance of tube well Phase -II |
500000 |
Maintenance of tube well Phase -II1 |
Completion of work |
-
latitude : 24.4240901
Longitude : 87.834608
file name : Image_17082022123339931.png
|
2022-08-17 12:33:40.031378 |
283 |
46808469 |
Maintenance of tube well Phase -II |
500000 |
Maintenance of tube well Phase -II1 |
Completion of work |
-
latitude : 24.4240937
Longitude : 87.8346096
file name : Image_17082022123247964.png
|
2022-08-17 12:32:48.069035 |
284 |
46808469 |
Maintenance of tube well Phase -II |
500000 |
Maintenance of tube well Phase -II1 |
Completion of work |
-
latitude : 24.42408691160381
Longitude : 87.83468954265118
file name : Image_17082022123421591.png
|
2022-08-17 12:34:21.685383 |
285 |
34088510 |
Protection of road at Nal Dighi purba par at Dhananjoypur |
149845 |
Protection of road at Nal Dighi purba par at Dhananjoypur1 |
Completion of work |
-
latitude : 24.416310265660286,24.416308840736747
Longitude : 87.8244253154844,87.82447963021696
file name : Image_08122021150613694.png
|
2021-12-08 15:06:13.788951 |
286 |
34088510 |
Protection of road at Nal Dighi purba par at Dhananjoypur |
149845 |
Protection of road at Nal Dighi purba par at Dhananjoypur1 |
Completion of work |
-
latitude : 24.41634471528232,24.41628352738917
Longitude : 87.8245188575238,87.82444040291011
file name : Image_08122021150709314.png
|
2021-12-08 15:07:09.401007 |
287 |
34088510 |
Protection of road at Nal Dighi purba par at Dhananjoypur |
149845 |
Protection of road at Nal Dighi purba par at Dhananjoypur1 |
Completion of work |
-
latitude : 24.41626864951104,24.416266093030572
Longitude : 87.82443763688207,87.82443537376821
file name : Image_08122021150810496.png
|
2021-12-08 15:08:10.582621 |
288 |
34064171 |
Upgradation of Road from Serajul Islam house to Ummati Abdul Khayer house at Baliara |
78495 |
Upgradation of Road from Serajul Islam house to Ummati Abdul Khayer house at Baliara1 |
Plinth level |
-
latitude : 24.448022902943194,24.44807516410947
Longitude : 87.82355938106775,87.82356290146708
file name : Image_13012021151311733.png
|
2021-01-13 15:13:11.818623 |
289 |
34064171 |
Upgradation of Road from Serajul Islam house to Ummati Abdul Khayer house at Baliara |
78495 |
Upgradation of Road from Serajul Islam house to Ummati Abdul Khayer house at Baliara1 |
Plinth level |
-
latitude : 24.448006474412978,24.448041301220655
Longitude : 87.82352660782635,87.82353172078729
file name : Image_13012021151039646.png
|
2021-01-13 15:10:39.728126 |
290 |
34064171 |
Upgradation of Road from Serajul Islam house to Ummati Abdul Khayer house at Baliara |
78495 |
Upgradation of Road from Serajul Islam house to Ummati Abdul Khayer house at Baliara1 |
Completion of work |
-
latitude : 24.44805299397558,24.44805299397558,24.448102950118482
Longitude : 87.82358075492084,87.82358075492084,87.82360170967877
file name : Image_13012021111808612.png
|
2021-01-13 11:18:08.708047 |
291 |
46802281 |
Construction of CC road with drain with slab from Zakir Hossain land to Islam house and Sebina Sulta |
250000 |
Construction of CC road with drain with slab from Zakir Hossain land to Islam house and Sebina Sulta1 |
Completion of work |
-
latitude : 24.433250720612705,24.433221300132573
Longitude : 87.79942117631435,87.79943626374006
file name : Image_09112022125527520.png
|
2022-11-09 12:55:27.639668 |
292 |
46802281 |
Construction of CC road with drain with slab from Zakir Hossain land to Islam house and Sebina Sulta |
250000 |
Construction of CC road with drain with slab from Zakir Hossain land to Islam house and Sebina Sulta1 |
Completion of work |
-
latitude : 24.43328940309584,24.433324774727225
Longitude : 87.79947347939014,87.79953491874039
file name : Image_25112022143210915.png
|
2022-11-25 14:32:11.018022 |
293 |
46802661 |
Construction of CC road with drain with slab from Golak Bhattacharjee house to Sandip Bhattacharjee |
250000 |
Construction of CC road with drain with slab from Golak Bhattacharjee house to Sandip Bhattacharjee 1 |
Completion of work |
-
latitude : 24.42994812503457,24.4305685
Longitude : 87.80212978832424,87.8008185
file name : Image_11112022154700191.png
|
2022-11-11 15:47:00.293186 |
294 |
46997890 |
Construction of CC road from Jalal land to Pagla river and Nobiot house to Mojibul house and Helal h |
250000 |
Construction of CC road from Jalal land to Pagla river and Nobiot house to Mojibul house and Helal h1 |
Completion of work |
-
latitude : 24.4241164,24.4241174
Longitude : 87.834605,87.8346049
file name : Image_20102022161643329.png
|
2022-10-20 16:16:43.523466 |
295 |
46997890 |
Construction of CC road from Jalal land to Pagla river and Nobiot house to Mojibul house and Helal h |
250000 |
Construction of CC road from Jalal land to Pagla river and Nobiot house to Mojibul house and Helal h1 |
Plinth level |
-
latitude : 24.41548435483128,24.415514739230275
Longitude : 87.82781328074634,87.82787195406854
file name : Image_17112022130052178.png
|
2022-11-17 13:00:52.312903 |
296 |
46979045 |
Installation of Solar Street Light within Sansad III |
100000 |
Installation of Solar Street Light within Sansad III1 |
Completion of work |
-
latitude : 24.445710629224777
Longitude : 87.82483275979757
file name : Image_26092022111526008.png
|
2022-09-26 11:15:26.095846 |
297 |
46979045 |
Installation of Solar Street Light within Sansad III |
100000 |
Installation of Solar Street Light within Sansad III1 |
Completion of work |
-
latitude : 24.44566515740007
Longitude : 87.82480107620358
file name : Image_26092022111419468.png
|
2022-09-26 11:14:19.562155 |
298 |
46979045 |
Installation of Solar Street Light within Sansad III |
100000 |
Installation of Solar Street Light within Sansad III1 |
Completion of work |
-
latitude : 24.445663187652826
Longitude : 87.82479747198522
file name : Image_26092022111325337.png
|
2022-09-26 11:13:25.431497 |
299 |
46979173 |
Installation of Solar Street Light within Sansad IV |
250000 |
Installation of Solar Street Light within Sansad IV1 |
Completion of work |
-
latitude : 24.4461277
Longitude : 87.8238114
file name : Image_26092022110051461.png
|
2022-09-26 11:00:51.571501 |
300 |
46979173 |
Installation of Solar Street Light within Sansad IV |
250000 |
Installation of Solar Street Light within Sansad IV1 |
Completion of work |
-
latitude : 24.4461277
Longitude : 87.8238114
file name : Image_26092022105948600.png
|
2022-09-26 10:59:48.722051 |
301 |
46979173 |
Installation of Solar Street Light within Sansad IV |
250000 |
Installation of Solar Street Light within Sansad IV1 |
Completion of work |
-
latitude : 24.4461277
Longitude : 87.8238114
file name : Image_26092022110132381.png
|
2022-09-26 11:01:32.472814 |
302 |
46719129 |
Construction of CC road with drain with slab from Moloypur Pitch road towards Ahad house at Baliara |
100000 |
Construction of CC road with drain with slab from Moloypur Pitch road towards Ahad house at Baliara1 |
Plinth level |
-
latitude : 24.445584313943982,24.445592192932963
Longitude : 87.82254047691822,87.82255472615361
file name : Image_02112022112931906.png
|
2022-11-02 11:29:32.00938 |
303 |
46719129 |
Construction of CC road with drain with slab from Moloypur Pitch road towards Ahad house at Baliara |
100000 |
Construction of CC road with drain with slab from Moloypur Pitch road towards Ahad house at Baliara1 |
Plinth level |
-
latitude : 24.445582763291895,24.445603634230793
Longitude : 87.82252647913992,87.82253351993859
file name : Image_02112022112843611.png
|
2022-11-02 11:28:43.718391 |
304 |
46719129 |
Construction of CC road with drain with slab from Moloypur Pitch road towards Ahad house at Baliara |
100000 |
Construction of CC road with drain with slab from Moloypur Pitch road towards Ahad house at Baliara1 |
Completion of work |
-
latitude : 24.445535489358008,24.44553293287754
Longitude : 87.82255581580102,87.82256428152323
file name : Image_26092022111801467.png
|
2022-09-26 11:18:01.572924 |
305 |
46724916 |
Construction of pucca drain with slab from Noren house towards Tofejul house at Baliara |
200000 |
Construction of pucca drain with slab from Noren house towards Tofejul house at Baliara1 |
Completion of work |
-
latitude : 24.44787056185305,24.447833513841033
Longitude : 87.82508212141693,87.82509502954781
file name : Image_26092022110553179.png
|
2022-09-26 11:05:53.264725 |
306 |
46724916 |
Construction of pucca drain with slab from Noren house towards Tofejul house at Baliara |
200000 |
Construction of pucca drain with slab from Noren house towards Tofejul house at Baliara1 |
Completion of work |
-
latitude : 24.447856354527175,24.447837537154555
Longitude : 87.82508010976017,87.82504423521459
file name : Image_26092022110448758.png
|
2022-09-26 11:04:48.842446 |
307 |
46724916 |
Construction of pucca drain with slab from Noren house towards Tofejul house at Baliara |
200000 |
Construction of pucca drain with slab from Noren house towards Tofejul house at Baliara1 |
Plinth level |
-
latitude : 24.447832675650716,24.44782454520464
Longitude : 87.82513425685465,87.8251264616847
file name : Image_02112022112511772.png
|
2022-11-02 11:25:11.872245 |
308 |
46719818 |
Construction of CC road with drain with slab from Dalim Sk house towards Tahir Sk house at Baliara |
250000 |
Construction of CC road with drain with slab from Dalim Sk house towards Tahir Sk house at Baliara1 |
Plinth level |
-
latitude : 24.445688291452825,24.445729991421103
Longitude : 87.82661123201251,87.82662615180016
file name : Image_02112022113233794.png
|
2022-11-02 11:32:33.902429 |
309 |
46719818 |
Construction of CC road with drain with slab from Dalim Sk house towards Tahir Sk house at Baliara |
250000 |
Construction of CC road with drain with slab from Dalim Sk house towards Tahir Sk house at Baliara1 |
Completion of work |
-
latitude : 24.44571637082845,24.445695499889553
Longitude : 87.8265858348459,87.82657669857144
file name : Image_26092022112457856.png
|
2022-09-26 11:24:57.972513 |
310 |
46719818 |
Construction of CC road with drain with slab from Dalim Sk house towards Tahir Sk house at Baliara |
250000 |
Construction of CC road with drain with slab from Dalim Sk house towards Tahir Sk house at Baliara1 |
Plinth level |
-
latitude : 24.445709916763008,24.44567752070725
Longitude : 87.82660293392837,87.82656580209732
file name : Image_02112022113318407.png
|
2022-11-02 11:33:18.521124 |
311 |
46994910 |
Up gradation of road from Society towards Serajul house with culvert at Dumurgram |
200000 |
Up gradation of road from Society towards Serajul house with culvert at Dumurgram1 |
Completion of work |
-
latitude : 24.44973247591406,24.44974856916815
Longitude : 87.83843382261693,87.83845469355583
file name : Image_14102022115800042.png
|
2022-10-14 11:58:00.168287 |
312 |
46994910 |
Up gradation of road from Society towards Serajul house with culvert at Dumurgram |
200000 |
Up gradation of road from Society towards Serajul house with culvert at Dumurgram1 |
Completion of work |
-
latitude : 24.449756490066648,24.449749533087015
Longitude : 87.83844262361526,87.83840733580291
file name : Image_14102022115915706.png
|
2022-10-14 11:59:15.861306 |
313 |
46994910 |
Up gradation of road from Society towards Serajul house with culvert at Dumurgram |
200000 |
Up gradation of road from Society towards Serajul house with culvert at Dumurgram1 |
Plinth level |
-
latitude : 24.449930330738425,24.449916165322065
Longitude : 87.83850917592645,87.83854111097753
file name : Image_02112022111619768.png
|
2022-11-02 11:16:19.857936 |
314 |
46994910 |
Up gradation of road from Society towards Serajul house with culvert at Dumurgram |
200000 |
Up gradation of road from Society towards Serajul house with culvert at Dumurgram1 |
Completion of work |
-
latitude : 24.450034643523395,24.449863568879664
Longitude : 87.84095627255738,87.8384857904166
file name : Image_26092022104522702.png
|
2022-09-26 10:45:22.806788 |
315 |
46994910 |
Up gradation of road from Society towards Serajul house with culvert at Dumurgram |
200000 |
Up gradation of road from Society towards Serajul house with culvert at Dumurgram1 |
Plinth level |
-
latitude : 24.449915746226907,24.449907280504704
Longitude : 87.83853968605399,87.8385288733989
file name : Image_02112022111707825.png
|
2022-11-02 11:17:07.927357 |
316 |
46978909 |
Installation of Solar Street Light within Sansad II |
150000 |
Installation of Solar Street Light within Sansad II1 |
Plinth level |
-
latitude : 24.446697304956615
Longitude : 87.82428810372949
file name : Image_26092022110939236.png
|
2022-09-26 11:09:39.325666 |
317 |
46978909 |
Installation of Solar Street Light within Sansad II |
150000 |
Installation of Solar Street Light within Sansad II1 |
Plinth level |
-
latitude : 24.446695712395012
Longitude : 87.8242651373148
file name : Image_26092022111122644.png
|
2022-09-26 11:11:22.726426 |
318 |
46978909 |
Installation of Solar Street Light within Sansad II |
150000 |
Installation of Solar Street Light within Sansad II1 |
Plinth level |
-
latitude : 24.44670786615461
Longitude : 87.82425407320261
file name : Image_26092022111031322.png
|
2022-09-26 11:10:31.483244 |
319 |
46995165 |
Installation of Solar Street Light within Sansad VIII |
100000 |
Installation of Solar Street Light within Sansad VIII1 |
Completion of work |
-
latitude : 24.44934854283929
Longitude : 87.83612729050219
file name : Image_26092022105621557.png
|
2022-09-26 10:56:21.701064 |
320 |
46995165 |
Installation of Solar Street Light within Sansad VIII |
100000 |
Installation of Solar Street Light within Sansad VIII1 |
Completion of work |
-
latitude : 24.449391500093043
Longitude : 87.83609451726079
file name : Image_26092022105326961.png
|
2022-09-26 10:53:27.082097 |
321 |
46995165 |
Installation of Solar Street Light within Sansad VIII |
100000 |
Installation of Solar Street Light within Sansad VIII1 |
Completion of work |
-
latitude : 24.44936664775014
Longitude : 87.83612075261772
file name : Image_26092022105139687.png
|
2022-09-26 10:51:39.804624 |
322 |
46995283 |
Installation of Solar Street Light within Sansad IX |
100000 |
Installation of Solar Street Light within Sansad IX1 |
Completion of work |
-
latitude : 24.43259575869888
Longitude : 87.80178881250322
file name : Image_26092022113743258.png
|
2022-09-26 11:37:43.35532 |
323 |
46995283 |
Installation of Solar Street Light within Sansad IX |
100000 |
Installation of Solar Street Light within Sansad IX1 |
Completion of work |
-
latitude : 24.432619814760983
Longitude : 87.80180934816599
file name : Image_26092022113706803.png
|
2022-09-26 11:37:06.901335 |
324 |
46995283 |
Installation of Solar Street Light within Sansad IX |
100000 |
Installation of Solar Street Light within Sansad IX1 |
Completion of work |
-
latitude : 24.432610385119915
Longitude : 87.80182611197233
file name : Image_26092022113626784.png
|
2022-09-26 11:36:26.89129 |
325 |
46996686 |
Installation of Solar Street Light within Sansad X |
100000 |
Installation of Solar Street Light within Sansad X1 |
Completion of work |
-
latitude : 24.430311480537057
Longitude : 87.80175142921507
file name : Image_26092022114135230.png
|
2022-09-26 11:41:35.33159 |
326 |
46996686 |
Installation of Solar Street Light within Sansad X |
100000 |
Installation of Solar Street Light within Sansad X1 |
Completion of work |
-
latitude : 24.430296644568443
Longitude : 87.80174966901541
file name : Image_26092022114221075.png
|
2022-09-26 11:42:21.192705 |
327 |
46996686 |
Installation of Solar Street Light within Sansad X |
100000 |
Installation of Solar Street Light within Sansad X1 |
Completion of work |
-
latitude : 24.43032124545425
Longitude : 87.80168747529387
file name : Image_26092022114052436.png
|
2022-09-26 11:40:52.544449 |
328 |
46996846 |
Installation of Solar Street Light within Sansad XI |
200000 |
Installation of Solar Street Light within Sansad XI1 |
Completion of work |
-
latitude : 24.4137226
Longitude : 87.8197322
file name : Image_26092022115632957.png
|
2022-09-26 11:56:33.061906 |
329 |
46996846 |
Installation of Solar Street Light within Sansad XI |
200000 |
Installation of Solar Street Light within Sansad XI1 |
Completion of work |
-
latitude : 24.41372
Longitude : 87.8197271
file name : Image_26092022115502218.png
|
2022-09-26 11:55:02.328932 |
330 |
46996846 |
Installation of Solar Street Light within Sansad XI |
200000 |
Installation of Solar Street Light within Sansad XI1 |
Completion of work |
-
latitude : 24.41372
Longitude : 87.8197271
file name : Image_26092022115545237.png
|
2022-09-26 11:55:45.352771 |
331 |
47188183 |
Construction of CC road from Bhuban Mal house to Baru Mal house at Bahadurpur |
150000 |
Construction of CC road from Bhuban Mal house to Baru Mal house at Bahadurpur 1 |
Completion of work |
-
latitude : 24.417539471760392,24.41755091305822
Longitude : 87.84071856178343,87.84072685986757
file name : Image_10112022131005777.png
|
2022-11-10 13:10:05.863751 |
332 |
47188183 |
Construction of CC road from Bhuban Mal house to Baru Mal house at Bahadurpur |
150000 |
Construction of CC road from Bhuban Mal house to Baru Mal house at Bahadurpur 1 |
Plinth level |
-
latitude : 24.417591020464897,24.41759139765054
Longitude : 87.84094889648259,87.84102089703083
file name : Image_17112022123417856.png
|
2022-11-17 12:34:17.953835 |
333 |
46807900 |
Installation of Tubewell within GP area |
105301 |
Installation of Tubewell within GP area1 |
Completion of work |
-
latitude : 24.45310635957867
Longitude : 87.8429033048451
file name : Image_17112022113151485.png
|
2022-11-17 11:31:51.594827 |
334 |
46807900 |
Installation of Tubewell within GP area |
105301 |
Installation of Tubewell within GP area1 |
Completion of work |
-
latitude : 24.453153633512557
Longitude : 87.8428929951042
file name : Image_17112022113231159.png
|
2022-11-17 11:32:31.263706 |
335 |
46808797 |
Construction of pucca drain with slab from Rajab Ali house to Halim Dafadar house at Bahadurpur |
100000 |
Construction of pucca drain with slab from Rajab Ali house to Halim Dafadar house at Bahadurpur 1 |
Plinth level |
-
latitude : 24.4241397,24.424141,24.424141
Longitude : 87.8345671,87.834562,87.834562
file name : Image_06022023123501401.png
|
2023-02-06 12:35:01.495657 |
336 |
46808797 |
Construction of pucca drain with slab from Rajab Ali house to Halim Dafadar house at Bahadurpur |
100000 |
Construction of pucca drain with slab from Rajab Ali house to Halim Dafadar house at Bahadurpur 1 |
Completion of work |
-
latitude : 24.424118,24.42345860414207
Longitude : 87.8346257,87.83450128510594
file name : Image_21112022125630872.png
|
2022-11-21 12:06:38.653851 |
337 |
46808797 |
Construction of pucca drain with slab from Rajab Ali house to Halim Dafadar house at Bahadurpur |
100000 |
Construction of pucca drain with slab from Rajab Ali house to Halim Dafadar house at Bahadurpur 1 |
Completion of work |
-
latitude : 24.424115,24.423381029628217
Longitude : 87.8346206,87.83456423319876
file name : Image_21112022125746897.png
|
2022-11-21 12:07:54.636114 |
338 |
56799335 |
Construction of pucca drain with Culvert from Nanku Mal house to Talbuna Pukur at Dhananjaypur |
150000 |
Construction of pucca drain with Culvert from Nanku Mal house to Talbuna Pukur at Dhananjaypur1 |
Completion of work |
-
latitude : 24.416997372172773,24.41695592366159
Longitude : 87.82523240894079,87.82523232512176
file name : Image_03082023140544733.png
|
2023-08-03 14:05:44.915365 |
339 |
46718818 |
Construction of pucca drain with slab from Mohiuddin house towards Mokbul Sk house at Moloypur |
200000 |
Construction of pucca drain with slab from Mohiuddin house towards Mokbul Sk house at Moloypur1 |
Completion of work |
-
latitude : 24.4241399,24.4241417
Longitude : 87.8345718,87.834572
file name : Image_06022023143714534.png
|
2023-02-06 14:37:14.66126 |
340 |
46718818 |
Construction of pucca drain with slab from Mohiuddin house towards Mokbul Sk house at Moloypur |
200000 |
Construction of pucca drain with slab from Mohiuddin house towards Mokbul Sk house at Moloypur1 |
Plinth level |
-
latitude : 24.4241385,24.4241385
Longitude : 87.8345682,87.8345682
file name : Image_09022023120323959.png
|
2023-02-09 12:03:24.046403 |
341 |
46997672 |
Construction Road protection wall from Dilip Ghosh house to Rahebuddin Mondal house at Dhananjoypur |
300000 |
Construction Road protection wall from Dilip Ghosh house to Rahebuddin Mondal house at Dhananjoypur1 |
Completion of work |
-
latitude : 24.4184714
Longitude : 87.8245086
file name : Image_10022023111435693.png
|
2023-02-10 11:14:35.79893 |
342 |
56796167 |
Construction of pucca drain from Alum Sk house towards Lilan Sk house at Dumurgram |
56360 |
Construction of pucca drain from Alum Sk house towards Lilan Sk house at Dumurgram1 |
Completion of work |
-
latitude : 24.4510455,24.4510449
Longitude : 87.8409028,87.8409029
file name : Image_01032023113740096.png
|
2023-03-01 11:37:40.206899 |
343 |
56793423 |
Construction of drain from Choto Salla Pukur towards Sankotala at Baliara |
100000 |
Construction of drain from Choto Salla Pukur towards Sankotala at Baliara1 |
Completion of work |
-
latitude : 24.446470700204372,24.44649894721806
Longitude : 87.82354462891817,87.82357178628445
file name : Image_15032023113804414.png
|
2023-03-15 11:38:04.744756 |
344 |
56793423 |
Construction of drain from Choto Salla Pukur towards Sankotala at Baliara |
100000 |
Construction of drain from Choto Salla Pukur towards Sankotala at Baliara1 |
Completion of work |
-
latitude : 24.446472586132586,24.446470700204372
Longitude : 87.82352736219764,87.82354462891817
file name : Image_15032023113720589.png
|
2023-03-15 11:37:20.680573 |
345 |
56793423 |
Construction of drain from Choto Salla Pukur towards Sankotala at Baliara |
100000 |
Construction of drain from Choto Salla Pukur towards Sankotala at Baliara1 |
Completion of work |
-
latitude : 24.446459929458797,24.446472586132586
Longitude : 87.82352853566408,87.82352736219764
file name : Image_15032023113633464.png
|
2023-03-15 11:36:33.578279 |
346 |
56797288 |
Construction of pucca drain from Samar Bhaskar house towards Dulal Bhaskar house at Dumurgram |
100000 |
Construction of pucca drain from Samar Bhaskar house towards Dulal Bhaskar house at Dumurgram1 |
Completion of work |
-
latitude : 24.4497,24.45096356794238,24.450943199917674
Longitude : 87.840087,87.84228715114295,87.84227172844112
file name : Image_01032023114209274.png
|
2023-03-01 11:42:09.384729 |
347 |
46807732 |
Construction of Pucca drain with slab from Rejaul Karim house to Khairul Basar house at Tapna |
200000 |
Construction of Pucca drain with slab from Rejaul Karim house to Khairul Basar house at Tapna1 |
Plinth level |
-
latitude : 24.4241191,24.4241176,24.4241171
Longitude : 87.8346253,87.8346257,87.8346253
file name : Image_02032023123132875.png
|
2023-03-02 12:31:32.968542 |
348 |
46807732 |
Construction of Pucca drain with slab from Rejaul Karim house to Khairul Basar house at Tapna |
200000 |
Construction of Pucca drain with slab from Rejaul Karim house to Khairul Basar house at Tapna1 |
Completion of work |
-
latitude : 24.4241158,24.4241132
Longitude : 87.8346244,87.8346257
file name : Image_02032023121759038.png
|
2023-03-02 12:17:59.138317 |
349 |
34067308 |
Upgradation of road from Year Mahammad house to towards Liltu House at Dumurgram |
199781 |
Upgradation of road from Year Mahammad house to towards Liltu House at Dumurgram 1 |
Completion of work |
-
latitude : 24.45220740046352,24.45223443210125
Longitude : 87.83566159196198,87.83567441627383
file name : Image_21092021134627481.png
|
2021-09-21 13:46:27.616072 |
350 |
34067308 |
Upgradation of road from Year Mahammad house to towards Liltu House at Dumurgram |
199781 |
Upgradation of road from Year Mahammad house to towards Liltu House at Dumurgram 1 |
Completion of work |
-
latitude : 24.45223221089691,24.452292644418776
Longitude : 87.83569947816432,87.8356812056154
file name : Image_28102021131740612.png
|
2021-10-28 13:17:40.734577 |
351 |
34067308 |
Upgradation of road from Year Mahammad house to towards Liltu House at Dumurgram |
199781 |
Upgradation of road from Year Mahammad house to towards Liltu House at Dumurgram 1 |
Completion of work |
-
latitude : 24.452289710752666,24.452256099320948
Longitude : 87.83564591780305,87.83562647178769
file name : Image_28102021131744530.png
|
2021-10-28 13:17:44.61965 |
352 |
34067308 |
Upgradation of road from Year Mahammad house to towards Liltu House at Dumurgram |
199781 |
Upgradation of road from Year Mahammad house to towards Liltu House at Dumurgram 1 |
Completion of work |
-
latitude : 24.4522776408121,24.452263391576707
Longitude : 87.83558623865247,87.83566955476999
file name : Image_28102021131748979.png
|
2021-10-28 13:17:49.072434 |
353 |
34188610 |
Upgradation of road from Dhuku house to towards Bajle house at Bahadurpur |
249246 |
Upgradation of road from Dhuku house to towards Bajle house at Bahadurpur1 |
Completion of work |
-
latitude : 24.42080640234053,24.420795631594956
Longitude : 87.83667395822704,87.83663724549115
file name : Image_23082021113009455.png
|
2021-08-23 11:30:09.549092 |
354 |
34188610 |
Upgradation of road from Dhuku house to towards Bajle house at Bahadurpur |
249246 |
Upgradation of road from Dhuku house to towards Bajle house at Bahadurpur1 |
Completion of work |
-
latitude : 24.42033181898296,24.420333076268435
Longitude : 87.83666658215225,87.83666892908514
file name : Image_23082021113155715.png
|
2021-08-23 11:31:55.824709 |
355 |
34188610 |
Upgradation of road from Dhuku house to towards Bajle house at Bahadurpur |
249246 |
Upgradation of road from Dhuku house to towards Bajle house at Bahadurpur1 |
Completion of work |
-
latitude : 24.42031958140433,24.4199654
Longitude : 87.8366794064641,87.8370166
file name : Image_23082021113246400.png
|
2021-08-23 11:32:46.498542 |
356 |
34192173 |
Upgradation of road from Achin Mal house to towards ICDS at Bahadurpur |
148447 |
Upgradation of road from Achin Mal house to towards ICDS at Bahadurpur1 |
Completion of work |
-
latitude : 24.418758074752986,24.418735527433455
Longitude : 87.8411661554128,87.84121720120311
file name : Image_23082021114115540.png
|
2021-08-23 11:41:15.642479 |
357 |
34192173 |
Upgradation of road from Achin Mal house to towards ICDS at Bahadurpur |
148447 |
Upgradation of road from Achin Mal house to towards ICDS at Bahadurpur1 |
Completion of work |
-
latitude : 24.418728654272854,24.418721864931285
Longitude : 87.841219548136,87.8411656524986
file name : Image_23082021114154260.png
|
2021-08-23 11:41:54.359712 |
358 |
34192173 |
Upgradation of road from Achin Mal house to towards ICDS at Bahadurpur |
148447 |
Upgradation of road from Achin Mal house to towards ICDS at Bahadurpur1 |
Completion of work |
-
latitude : 24.418733809143305,24.418726307339966
Longitude : 87.84117520786822,87.84120194613934
file name : Image_23082021123153845.png
|
2021-08-23 12:31:53.931979 |
359 |
34058575 |
Upgradation of Drain from Lalchand house to Halim house at Moloypur |
199097 |
Upgradation of Drain from Lalchand house to Halim house at Moloypur1 |
Completion of work |
-
latitude : 24.44598094560206,24.445960954762995
Longitude : 87.80496102757752,87.8049432579428
file name : Image_24122021111411077.png
|
2021-12-24 11:14:11.182047 |
360 |
34058575 |
Upgradation of Drain from Lalchand house to Halim house at Moloypur |
199097 |
Upgradation of Drain from Lalchand house to Halim house at Moloypur1 |
Completion of work |
-
latitude : 24.445959320291877,24.445937359705567
Longitude : 87.80496798455715,87.8049689065665
file name : Image_24122021111449055.png
|
2021-12-24 11:14:49.155079 |
361 |
34058575 |
Upgradation of Drain from Lalchand house to Halim house at Moloypur |
199097 |
Upgradation of Drain from Lalchand house to Halim house at Moloypur1 |
Completion of work |
-
latitude : 24.44595412351191,24.445966822095215
Longitude : 87.8049725946039,87.80494770035148
file name : Image_24122021111520501.png
|
2021-12-24 11:15:20.609069 |
362 |
34058575 |
Upgradation of Drain from Lalchand house to Halim house at Moloypur |
199097 |
Upgradation of Drain from Lalchand house to Halim house at Moloypur1 |
Completion of work |
-
latitude : 24.445946202613413,24.445973108522594
Longitude : 87.80497862957418,87.80503537505865
file name : Image_24122021111609017.png
|
2021-12-24 11:16:09.11294 |
363 |
34058575 |
Upgradation of Drain from Lalchand house to Halim house at Moloypur |
199097 |
Upgradation of Drain from Lalchand house to Halim house at Moloypur1 |
Completion of work |
-
latitude : 24.44597164168954,24.44600177463144
Longitude : 87.80498458072543,87.80498986132443
file name : Image_20012022160803752.png
|
2022-01-20 16:08:03.844366 |
364 |
34064434 |
Upgradation of Drain from near Dakshin para waktia mosjid at Baliara |
149755 |
Upgradation of Drain from near Dakshin para waktia mosjid at Baliara1 |
Plinth level |
-
latitude : 24.445594204589725,24.44563230033964
Longitude : 87.82261080108583,87.82264022156596
file name : Image_23082021131137360.png
|
2021-08-23 13:11:37.456678 |
365 |
34064434 |
Upgradation of Drain from near Dakshin para waktia mosjid at Baliara |
149755 |
Upgradation of Drain from near Dakshin para waktia mosjid at Baliara1 |
Plinth level |
-
latitude : 24.44563230033964,24.445598269812763
Longitude : 87.82264022156596,87.82266243360937
file name : Image_23082021131227188.png
|
2021-08-23 13:12:27.279948 |
366 |
34064434 |
Upgradation of Drain from near Dakshin para waktia mosjid at Baliara |
149755 |
Upgradation of Drain from near Dakshin para waktia mosjid at Baliara1 |
Plinth level |
-
latitude : 24.4456084119156,24.44562278687954
Longitude : 87.8226625174284,87.82266553491354
file name : Image_23082021131305804.png
|
2021-08-23 13:13:05.892375 |
367 |
34064434 |
Upgradation of Drain from near Dakshin para waktia mosjid at Baliara |
149755 |
Upgradation of Drain from near Dakshin para waktia mosjid at Baliara1 |
Completion of work |
-
latitude : 24.445634563453496,24.445634563453496,24.445634563453496
Longitude : 87.8226175904274,87.8226175904274,87.8226175904274
file name : Image_05082021130809130.png
|
2021-08-05 13:08:09.242143 |
368 |
34064548 |
Upgradation of Drain from Mohobulla Momin house to Amirul Momin house at Baliara |
149755 |
Upgradation of Drain from Mohobulla Momin house to Amirul Momin house at Baliara1 |
Completion of work |
-
latitude : 24.445976209826767,24.445966612547636
Longitude : 87.82519527710974,87.82514213584363
file name : Image_23082021130230800.png
|
2021-08-23 13:02:30.877855 |
369 |
34064548 |
Upgradation of Drain from Mohobulla Momin house to Amirul Momin house at Baliara |
149755 |
Upgradation of Drain from Mohobulla Momin house to Amirul Momin house at Baliara1 |
Completion of work |
-
latitude : 24.44589180406183,24.445877093821764
Longitude : 87.82529896125197,87.82525571063161
file name : Image_23082021130317107.png
|
2021-08-23 13:03:17.186061 |
370 |
34064548 |
Upgradation of Drain from Mohobulla Momin house to Amirul Momin house at Baliara |
149755 |
Upgradation of Drain from Mohobulla Momin house to Amirul Momin house at Baliara1 |
Completion of work |
-
latitude : 24.445892432704568,24.4460643036291
Longitude : 87.82523961737752,87.82514750026166
file name : Image_23082021130408106.png
|
2021-08-23 13:04:08.190896 |
371 |
34064617 |
Upgradation of Drain from Jamsed Momin house to Jamirul Momin house at Baliara |
100000 |
Upgradation of Drain from Jamsed Momin house to Jamirul Momin house at Baliara1 |
Completion of work |
-
latitude : 24.44633860141039,24.446360603906214
Longitude : 87.82518262043595,87.82523391768336
file name : Image_23082021125037751.png
|
2021-08-23 12:50:37.864645 |
372 |
34064617 |
Upgradation of Drain from Jamsed Momin house to Jamirul Momin house at Baliara |
100000 |
Upgradation of Drain from Jamsed Momin house to Jamirul Momin house at Baliara1 |
Completion of work |
-
latitude : 24.4463346619159,24.446360771544278
Longitude : 87.82522436231375,87.82520910724998
file name : Image_23082021125113798.png
|
2021-08-23 12:51:14.362423 |
373 |
34064617 |
Upgradation of Drain from Jamsed Momin house to Jamirul Momin house at Baliara |
100000 |
Upgradation of Drain from Jamsed Momin house to Jamirul Momin house at Baliara1 |
Completion of work |
-
latitude : 24.44637279957533,24.44633210543543
Longitude : 87.82523953355849,87.82522251829505
file name : Image_23082021125200434.png
|
2021-08-23 12:52:00.551823 |
374 |
34064981 |
Upgradation of drain with road from Bakkar house to towards Saju House at Kanakpur |
99502 |
Upgradation of drain with road from Bakkar house to towards Saju House at Kanakpur 1 |
Plinth level |
-
latitude : 24.431140408851206,24.43113856483251
Longitude : 87.80281567946076,87.80281769111753
file name : Image_08082021123807604.png
|
2021-08-08 12:38:07.700912 |
375 |
34064981 |
Upgradation of drain with road from Bakkar house to towards Saju House at Kanakpur |
99502 |
Upgradation of drain with road from Bakkar house to towards Saju House at Kanakpur 1 |
Plinth level |
-
latitude : 24.431111700832844,24.431110862642527
Longitude : 87.80283764004707,87.80283940024674
file name : Image_08082021123852875.png
|
2021-08-08 12:38:52.972856 |
376 |
34064981 |
Upgradation of drain with road from Bakkar house to towards Saju House at Kanakpur |
99502 |
Upgradation of drain with road from Bakkar house to towards Saju House at Kanakpur 1 |
Completion of work |
-
latitude : 24.43111174274236,24.431043891236186
Longitude : 87.80285390093923,87.80284711159766
file name : Image_26072021123442504.png
|
2021-07-26 12:34:42.591714 |
377 |
34189951 |
Upgradation of drain with road from Sultan house to towards Aynok house at Singhanagar |
199781 |
Upgradation of drain with road from Sultan house to towards Aynok house at Singhanagar1 |
Completion of work |
-
latitude : 24.424488320946693,24.424525033682585
Longitude : 87.83977199345827,87.83980292268097
file name : Image_16112021144026334.png
|
2021-11-16 14:40:26.458126 |
378 |
34189951 |
Upgradation of drain with road from Sultan house to towards Aynok house at Singhanagar |
199781 |
Upgradation of drain with road from Sultan house to towards Aynok house at Singhanagar1 |
Completion of work |
-
latitude : 24.424510281533003,24.42442906089127
Longitude : 87.83978548832238,87.8397982288152
file name : Image_16112021144118928.png
|
2021-11-16 14:41:19.036549 |
379 |
34189951 |
Upgradation of drain with road from Sultan house to towards Aynok house at Singhanagar |
199781 |
Upgradation of drain with road from Sultan house to towards Aynok house at Singhanagar1 |
Completion of work |
-
latitude : 24.42446367815137,24.42449473310262
Longitude : 87.83978758379817,87.83979881554842
file name : Image_16112021144205949.png
|
2021-11-16 14:42:06.060757 |
380 |
56796004 |
Construction of pucca drain from Lokhu house towards Ismail house at Baliara |
150000 |
Construction of pucca drain from Lokhu house towards Ismail house at Baliara1 |
Completion of work |
-
latitude : 24.447929235175252,24.447947591543198
Longitude : 87.82567212358117,87.82562996260822
file name : Image_15032023113142883.png
|
2023-03-15 11:31:42.989739 |
381 |
56797379 |
Construction of pucca drain from Tarak Dutta house towards Kandar at Dumurgram |
104413 |
Construction of pucca drain from Tarak Dutta house towards Kandar at Dumurgram1 |
Completion of work |
-
latitude : 24.45169011130929,24.45165620651096
Longitude : 87.84163772128522,87.84164501354098
file name : Image_20032023110208765.png
|
2023-03-20 11:02:08.854149 |
382 |
56800005 |
Construction of Pucca drain from Subrata Mal house to Primary School at Bahadurpur |
100000 |
Construction of Pucca drain from Subrata Mal house to Primary School at Bahadurpur1 |
Completion of work |
-
latitude : 24.41823194269091,24.418206084519625
Longitude : 87.83878301270306,87.83868377096951
file name : Image_01032023155108223.png
|
2023-03-01 15:51:08.353774 |
383 |
56800005 |
Construction of Pucca drain from Subrata Mal house to Primary School at Bahadurpur |
100000 |
Construction of Pucca drain from Subrata Mal house to Primary School at Bahadurpur1 |
Plinth level |
-
latitude : 24.4181901589036,24.41816941369325
Longitude : 87.83896263688803,87.83895509317517
file name : Image_16032023134038409.png
|
2023-03-16 13:40:38.503571 |
384 |
56796964 |
Construction of pucca ghat with Guard Wall at Purbapara Sahabakhana pukur at Dumurgram |
148091 |
Construction of pucca ghat with Guard Wall at Purbapara Sahabakhana pukur at Dumurgram1 |
Completion of work |
-
latitude : 24.4240914
Longitude : 87.834489
file name : Image_15052023115349416.png
|
2023-05-15 11:53:49.509419 |
385 |
56799680 |
Installation of Three numbers Tubewell within sansad XIV at Bahadurpur |
149940 |
Installation of Three numbers Tubewell within sansad XIV at Bahadurpur1 |
Completion of work |
-
latitude : 24.423369336873293
Longitude : 87.83176031894982
file name : Image_20032023130948910.png
|
2023-03-20 13:09:49.001007 |
386 |
56840331 |
Installation of Six numbers Solar Street Light within Sansad IX at Kanakpur |
149925 |
Installation of Six numbers Solar Street Light within Sansad IX at Kanakpur1 |
Completion of work |
-
latitude : 24.432122013531625
Longitude : 87.80500260181725
file name : Image_19052023113901426.png
|
2023-05-19 11:39:01.526685 |
387 |
56840331 |
Installation of Six numbers Solar Street Light within Sansad IX at Kanakpur |
149925 |
Installation of Six numbers Solar Street Light within Sansad IX at Kanakpur1 |
Completion of work |
-
latitude : 24.432153571397066
Longitude : 87.8049929626286
file name : Image_19052023113806074.png
|
2023-05-19 11:38:06.183158 |
388 |
56840331 |
Installation of Six numbers Solar Street Light within Sansad IX at Kanakpur |
149925 |
Installation of Six numbers Solar Street Light within Sansad IX at Kanakpur1 |
Completion of work |
-
latitude : 24.432113589718938
Longitude : 87.80500385910273
file name : Image_19052023113947509.png
|
2023-05-19 11:39:47.617333 |
389 |
56841913 |
Construction of CC road from Sadek to Pareshnath Mondal house at Singhanagar |
138505 |
Construction of CC road from Sadek to Pareshnath Mondal house at Singhanagar1 |
Completion of work |
-
latitude : 24.4170093,24.4170093,24.41760191693902,24.417629409581423
Longitude : 87.8379377,87.8379377,87.8369888663292,87.8369957394898
file name : Image_24032023160004798.png
|
2023-03-24 16:00:04.880821 |
390 |
56841149 |
Installation of Nine numbers Solar Street Light within Sansad XII at Dhananjaypur |
200000 |
Installation of Nine numbers Solar Street Light within Sansad XII at Dhananjaypur1 |
Completion of work |
-
latitude : 24.42228731699288
Longitude : 87.82878541387618
file name : Image_19052023121747261.png
|
2023-05-19 12:17:47.397269 |
391 |
56841149 |
Installation of Nine numbers Solar Street Light within Sansad XII at Dhananjaypur |
200000 |
Installation of Nine numbers Solar Street Light within Sansad XII at Dhananjaypur1 |
Completion of work |
-
latitude : 24.422246287576854
Longitude : 87.8287564124912
file name : Image_19052023121703094.png
|
2023-05-19 12:17:03.209612 |
392 |
56841149 |
Installation of Nine numbers Solar Street Light within Sansad XII at Dhananjaypur |
200000 |
Installation of Nine numbers Solar Street Light within Sansad XII at Dhananjaypur1 |
Completion of work |
-
latitude : 24.422264392487705
Longitude : 87.82875993289053
file name : Image_19052023121622397.png
|
2023-05-19 12:16:22.507942 |
393 |
34194091 |
Repairing and renovation of Sluice gate at Singhanagar |
250000 |
Repairing and renovation of Sluice gate at Singhanagar1 |
Completion of work |
-
latitude : 24.415451288223267
Longitude : 87.83568589948118
file name : Image_17052022163834005.png
|
2022-05-17 16:38:34.11473 |
394 |
34194091 |
Repairing and renovation of Sluice gate at Singhanagar |
250000 |
Repairing and renovation of Sluice gate at Singhanagar1 |
Completion of work |
-
latitude : 24.415460005402565
Longitude : 87.835703920573
file name : Image_17052022163926304.png
|
2022-05-17 16:39:26.405883 |
395 |
34194091 |
Repairing and renovation of Sluice gate at Singhanagar |
250000 |
Repairing and renovation of Sluice gate at Singhanagar1 |
Completion of work |
-
latitude : 24.415443995967507
Longitude : 87.83564105629921
file name : Image_17052022164011051.png
|
2022-05-17 16:40:11.167167 |
396 |
34194091 |
Repairing and renovation of Sluice gate at Singhanagar |
250000 |
Repairing and renovation of Sluice gate at Singhanagar1 |
Completion of work |
-
latitude : 24.415298528037965
Longitude : 87.83562454394996
file name : Image_02062021142856974.png
|
2021-06-02 14:28:57.076904 |
397 |
34194091 |
Repairing and renovation of Sluice gate at Singhanagar |
250000 |
Repairing and renovation of Sluice gate at Singhanagar1 |
Completion of work |
-
latitude : 24.415313196368515
Longitude : 87.83562663942575
file name : Image_02062021142956244.png
|
2021-06-02 14:29:56.340823 |
398 |
34202344 |
Upgradation of road from Kamal Hossain house Kemam Sk to Sukur Sk house at Dumurgram |
250000 |
Upgradation of road from Kamal Hossain house Kemam Sk to Sukur Sk house at Dumurgram 1 |
Completion of work |
-
latitude : 24.45209843572229,24.452137160114944
Longitude : 87.84241748973727,87.84238882362843
file name : Image_09092021110221606.png
|
2021-09-09 11:02:21.683548 |
399 |
34202344 |
Upgradation of road from Kamal Hossain house Kemam Sk to Sukur Sk house at Dumurgram |
250000 |
Upgradation of road from Kamal Hossain house Kemam Sk to Sukur Sk house at Dumurgram 1 |
Completion of work |
-
latitude : 24.452135232277215,24.45207509212196
Longitude : 87.84240332432091,87.84247976727784
file name : Image_09092021110322562.png
|
2021-09-09 11:03:22.637024 |
400 |
34202344 |
Upgradation of road from Kamal Hossain house Kemam Sk to Sukur Sk house at Dumurgram |
250000 |
Upgradation of road from Kamal Hossain house Kemam Sk to Sukur Sk house at Dumurgram 1 |
Completion of work |
-
latitude : 24.452045587822795,24.452133178710938
Longitude : 87.84250097349286,87.84247850999236
file name : Image_09092021110400619.png
|
2021-09-09 11:04:00.692034 |
401 |
34202344 |
Upgradation of road from Kamal Hossain house Kemam Sk to Sukur Sk house at Dumurgram |
250000 |
Upgradation of road from Kamal Hossain house Kemam Sk to Sukur Sk house at Dumurgram 1 |
Completion of work |
-
latitude : 24.452041732147336,24.452136154286563
Longitude : 87.84250130876899,87.84241631627083
file name : Image_09092021110438700.png
|
2021-09-09 11:04:38.775525 |
402 |
34202344 |
Upgradation of road from Kamal Hossain house Kemam Sk to Sukur Sk house at Dumurgram |
250000 |
Upgradation of road from Kamal Hossain house Kemam Sk to Sukur Sk house at Dumurgram 1 |
Completion of work |
-
latitude : 24.4524322,24.4524365
Longitude : 87.8425459,87.8425514
file name : Image_03062021105035809.png
|
2021-06-03 10:50:35.915161 |
403 |
34201950 |
Upgradation of drain with road from Hasmot Sk House to Motahar Sk House at Dumurgram |
200000 |
Upgradation of drain with road from Hasmot Sk House to Motahar Sk House at Dumurgram1 |
Plinth level |
-
latitude : 24.45144334807992,24.451394397765398
Longitude : 87.84014079719782,87.8400141466409
file name : Image_04022021112717845.png
|
2021-02-04 11:27:17.937531 |
404 |
34201950 |
Upgradation of drain with road from Hasmot Sk House to Motahar Sk House at Dumurgram |
200000 |
Upgradation of drain with road from Hasmot Sk House to Motahar Sk House at Dumurgram1 |
Plinth level |
-
latitude : 24.45141552016139,24.45142461452633,24.45142461452633
Longitude : 87.84005588851869,87.84010886214674,87.84010886214674
file name : Image_04022021112538345.png
|
2021-02-04 11:25:38.43703 |
405 |
34201950 |
Upgradation of drain with road from Hasmot Sk House to Motahar Sk House at Dumurgram |
200000 |
Upgradation of drain with road from Hasmot Sk House to Motahar Sk House at Dumurgram1 |
Completion of work |
-
latitude : 24.45136916823685,24.451452274806798
Longitude : 87.8400453273207,87.84010148607194
file name : Image_04022021112014863.png
|
2021-02-04 11:20:14.955066 |
406 |
34190950 |
Upgradation of drain with road from Gouranga Sarkar house to towards Hela Pukur at Bahadurpur |
149142 |
Upgradation of drain with road from Gouranga Sarkar house to towards Hela Pukur at Bahadurpur1 |
Plinth level |
-
latitude : 24.422510527074337,24.422590448521078
Longitude : 87.84512300044298,87.8451616410166
file name : Image_11022021151806559.png
|
2021-02-11 15:18:06.646143 |
407 |
34190950 |
Upgradation of drain with road from Gouranga Sarkar house to towards Hela Pukur at Bahadurpur |
149142 |
Upgradation of drain with road from Gouranga Sarkar house to towards Hela Pukur at Bahadurpur1 |
Completion of work |
-
latitude : 24.42255754955113,24.42242884542793
Longitude : 87.84515627659857,87.84519265405834
file name : Image_11022021151623722.png
|
2021-02-11 15:16:23.80711 |
408 |
34190950 |
Upgradation of drain with road from Gouranga Sarkar house to towards Hela Pukur at Bahadurpur |
149142 |
Upgradation of drain with road from Gouranga Sarkar house to towards Hela Pukur at Bahadurpur1 |
Completion of work |
-
latitude : 24.42259660921991,24.42255390342325
Longitude : 87.84514496102929,87.84512132406235
file name : Image_11022021151335030.png
|
2021-02-11 15:13:35.117677 |
409 |
34189032 |
Upgradation of drain with road from Matal Khan house to towards Munkir house at Bahadurpur |
100000 |
Upgradation of drain with road from Matal Khan house to towards Munkir house at Bahadurpur1 |
Plinth level |
-
latitude : 24.42095128353685,24.420999982394278
Longitude : 87.83666607923806,87.83668963238597
file name : Image_09022021145058472.png
|
2021-02-09 14:50:58.575572 |
410 |
34189032 |
Upgradation of drain with road from Matal Khan house to towards Munkir house at Bahadurpur |
100000 |
Upgradation of drain with road from Matal Khan house to towards Munkir house at Bahadurpur1 |
Completion of work |
-
latitude : 24.421021984890103,24.420986026525497
Longitude : 87.83666641451418,87.83666850998998
file name : Image_09022021144928416.png
|
2021-02-09 14:49:28.531794 |
411 |
34189032 |
Upgradation of drain with road from Matal Khan house to towards Munkir house at Bahadurpur |
100000 |
Upgradation of drain with road from Matal Khan house to towards Munkir house at Bahadurpur1 |
Completion of work |
-
latitude : 24.42102969624102,24.420963521115482
Longitude : 87.83664118498564,87.83663204871118
file name : Image_09022021144642603.png
|
2021-02-09 14:46:42.702513 |
412 |
34188085 |
Upgradation of drain from Doma pukur to towards Sadekul house at Dhananjoypur |
100000 |
Upgradation of drain from Doma pukur to towards Sadekul house at Dhananjoypur1 |
Plinth level |
-
latitude : 24.417879818938673,24.417879483662546
Longitude : 87.82623345963657,87.82632851041853
file name : Image_15022021142205873.png
|
2021-02-15 14:22:05.953207 |
413 |
34188085 |
Upgradation of drain from Doma pukur to towards Sadekul house at Dhananjoypur |
100000 |
Upgradation of drain from Doma pukur to towards Sadekul house at Dhananjoypur1 |
Completion of work |
-
latitude : 24.417891050688922,24.417876256629825,24.417890212498605
Longitude : 87.82623832114041,87.82625910826027,87.8262628801167
file name : Image_15022021142034952.png
|
2021-02-15 14:20:35.048359 |
414 |
34188085 |
Upgradation of drain from Doma pukur to towards Sadekul house at Dhananjoypur |
100000 |
Upgradation of drain from Doma pukur to towards Sadekul house at Dhananjoypur1 |
Completion of work |
-
latitude : 24.417903078719974,24.4179521
Longitude : 87.8262163605541,87.8259614
file name : Image_15022021141435676.png
|
2021-02-15 14:14:35.767178 |
415 |
34073215 |
Upgradation of Drain from Hodu Sk house to Giri Karmakar house at Bhusna Ganeshpur |
100000 |
Upgradation of Drain from Hodu Sk house to Giri Karmakar house at Bhusna Ganeshpur1 |
Plinth level |
-
latitude : 24.413945898413658,24.413965889252722
Longitude : 87.81857382506132,87.81855303794146
file name : Image_24022021154001132.png
|
2021-02-24 15:40:01.231004 |
416 |
34073215 |
Upgradation of Drain from Hodu Sk house to Giri Karmakar house at Bhusna Ganeshpur |
100000 |
Upgradation of Drain from Hodu Sk house to Giri Karmakar house at Bhusna Ganeshpur1 |
Completion of work |
-
latitude : 24.413957549259067,24.413972930051386
Longitude : 87.81858991831541,87.81854147091508
file name : Image_24022021153828432.png
|
2021-02-24 15:38:28.527833 |
417 |
34073215 |
Upgradation of Drain from Hodu Sk house to Giri Karmakar house at Bhusna Ganeshpur |
100000 |
Upgradation of Drain from Hodu Sk house to Giri Karmakar house at Bhusna Ganeshpur1 |
Completion of work |
-
latitude : 24.413928841240704,24.413975193165243
Longitude : 87.81850819475949,87.81851976178586
file name : Image_24022021153508617.png
|
2021-02-24 15:35:08.713013 |
418 |
34065242 |
Upgradation of Drain from Salam house to towards Imam house at Kanakpur |
100000 |
Upgradation of Drain from Salam house to towards Imam house at Kanakpur1 |
Plinth level |
-
latitude : 24.436855944804847,24.436822584830225,24.43682748824358
Longitude : 87.79649002477527,87.79646705836058,87.79648751020432
file name : Image_11022021130441303.png
|
2021-02-11 13:04:41.394651 |
419 |
34065242 |
Upgradation of Drain from Salam house to towards Imam house at Kanakpur |
100000 |
Upgradation of Drain from Salam house to towards Imam house at Kanakpur1 |
Completion of work |
-
latitude : 24.436854477971792,24.436861854046583
Longitude : 87.79653310775757,87.79656663537025
file name : Image_11022021130204933.png
|
2021-02-11 13:02:05.014386 |
420 |
34065242 |
Upgradation of Drain from Salam house to towards Imam house at Kanakpur |
100000 |
Upgradation of Drain from Salam house to towards Imam house at Kanakpur1 |
Completion of work |
-
latitude : 24.436876187101007,24.436853639781475
Longitude : 87.79653738252819,87.79657451435924
file name : Image_11022021125916440.png
|
2021-02-11 12:59:16.545657 |
421 |
34066316 |
Upgradation of road from Rejaul Sk house to towards Babul Sk House at Dumurgram |
99421 |
Upgradation of road from Rejaul Sk house to towards Babul Sk House at Dumurgram 1 |
Plinth level |
-
latitude : 24.451478803530335,24.451566017232835
Longitude : 87.84550513140857,87.84549926407635
file name : Image_13012021160421268.png
|
2021-01-13 16:04:21.346513 |
422 |
34066316 |
Upgradation of road from Rejaul Sk house to towards Babul Sk House at Dumurgram |
99421 |
Upgradation of road from Rejaul Sk house to towards Babul Sk House at Dumurgram 1 |
Completion of work |
-
latitude : 24.451479432173073,24.451520880684257
Longitude : 87.84549188800156,87.84554813057184
file name : Image_13012021160259145.png
|
2021-01-13 16:02:59.22828 |
423 |
34066316 |
Upgradation of road from Rejaul Sk house to towards Babul Sk House at Dumurgram |
99421 |
Upgradation of road from Rejaul Sk house to towards Babul Sk House at Dumurgram 1 |
Completion of work |
-
latitude : 24.451479851268232,24.45151103194803
Longitude : 87.8455276787281,87.84552860073745
file name : Image_13012021155911918.png
|
2021-01-13 15:59:12.036941 |
424 |
56804902 |
Construction of CC of road from Surful Sk house to Bapi Sk house at Baliara |
138505 |
Construction of CC of road from Surful Sk house to Bapi Sk house at Baliara1 |
Completion of work |
-
latitude : 24.439313309267163,24.439326343126595
Longitude : 87.83255006186664,87.83256565220654
file name : Image_15032023115013969.png
|
2023-03-15 11:50:14.320535 |
425 |
56797810 |
Construction of pucca drain from Milton house towards Edu house at Dumurgram |
148183 |
Construction of pucca drain from Milton house towards Edu house at Dumurgram1 |
Completion of work |
-
latitude : 24.4500255,24.4500231,24.44939011707902,24.44943634327501
Longitude : 87.835983,87.8359839,87.8360609896481,87.83607783727348
file name : Image_27032023163454879.png
|
2023-03-27 16:34:54.98073 |
426 |
56840879 |
Construction of CC road from Ofid Sk house to Kabarasthan at Bhushna |
117999 |
Construction of CC road from Ofid Sk house to Kabarasthan at Bhushna1 |
Plinth level |
-
latitude : 24.4606032,24.4606037
Longitude : 87.8234737,87.8234719
file name : Image_22052023125911075.png
|
2023-05-22 12:59:11.166778 |
427 |
56840879 |
Construction of CC road from Ofid Sk house to Kabarasthan at Bhushna |
117999 |
Construction of CC road from Ofid Sk house to Kabarasthan at Bhushna1 |
Completion of work |
-
latitude : 24.4124638941139,24.412476760335267
Longitude : 87.81970814801753,87.81966707669199
file name : Image_23032023122222734.png
|
2023-03-23 12:22:22.831606 |
428 |
56840879 |
Construction of CC road from Ofid Sk house to Kabarasthan at Bhushna |
117999 |
Construction of CC road from Ofid Sk house to Kabarasthan at Bhushna1 |
Plinth level |
-
latitude : 24.442079882137477,24.412519801408052
Longitude : 87.85267534665763,87.81968107447028
file name : Image_22052023130007726.png
|
2023-05-22 13:00:07.806061 |
429 |
56793073 |
Construction of drain from Sukuddi Momin Shop towards Younus Momin house at Baliara |
100000 |
Construction of drain from Sukuddi Momin Shop towards Younus Momin house at Baliara1 |
Plinth level |
-
latitude : 24.448394,24.448394
Longitude : 87.8265756,87.8265756
file name : Image_19052023112104210.png
|
2023-05-19 11:21:04.325006 |
430 |
56793073 |
Construction of drain from Sukuddi Momin Shop towards Younus Momin house at Baliara |
100000 |
Construction of drain from Sukuddi Momin Shop towards Younus Momin house at Baliara1 |
Plinth level |
-
latitude : 24.44643947761506,24.446420492604375
Longitude : 87.82462279312313,87.82464684918523
file name : Image_15052023124449955.png
|
2023-05-15 12:44:50.05367 |
431 |
56793073 |
Construction of drain from Sukuddi Momin Shop towards Younus Momin house at Baliara |
100000 |
Construction of drain from Sukuddi Momin Shop towards Younus Momin house at Baliara1 |
Completion of work |
-
latitude : 24.446077882312238,24.4606047,24.4606046
Longitude : 87.82438860274851,87.8234687,87.8234771
file name : Image_15052023124033917.png
|
2023-05-15 12:40:34.02416 |
432 |
56840481 |
Installation of Four numbers Solar Street Light within Sansad X at Kanakpur |
100000 |
Installation of Four numbers Solar Street Light within Sansad X at Kanakpur1 |
Completion of work |
-
latitude : 24.42878584843129
Longitude : 87.8007292561233
file name : Image_19052023115531603.png
|
2023-05-19 11:55:31.74029 |
433 |
56840481 |
Installation of Four numbers Solar Street Light within Sansad X at Kanakpur |
100000 |
Installation of Four numbers Solar Street Light within Sansad X at Kanakpur1 |
Completion of work |
-
latitude : 24.42874699831009
Longitude : 87.8007741831243
file name : Image_19052023115450964.png
|
2023-05-19 11:54:51.104495 |
434 |
56840481 |
Installation of Four numbers Solar Street Light within Sansad X at Kanakpur |
100000 |
Installation of Four numbers Solar Street Light within Sansad X at Kanakpur1 |
Completion of work |
-
latitude : 24.42872889339924
Longitude : 87.80077661387622
file name : Image_19052023115404150.png
|
2023-05-19 11:54:04.268502 |
435 |
56798636 |
Construction of pucca drain with slab from Patlu house to Anowar Sk house at Bhushna and Masjid to F |
160000 |
Construction of pucca drain with slab from Patlu house to Anowar Sk house at Bhushna and Masjid to F1 |
Completion of work |
-
latitude : 24.4188806,24.413978629745543,24.413956375792623
Longitude : 87.8130602,87.81876727938652,87.81880365684628
file name : Image_24072023130153676.png
|
2023-07-24 13:01:53.788077 |
436 |
56798147 |
Construction of pucca drain from Libraray to Muktara Begam house at Kanakpur |
210000 |
Construction of pucca drain from Libraray to Muktara Begam house at Kanakpur1 |
Completion of work |
-
latitude : 24.431112078018486,24.431092338636518
Longitude : 87.80047603882849,87.80042784288526
file name : Image_31052023125637770.png
|
2023-05-31 12:56:37.85894 |
437 |
56798972 |
Installation of Three numbers Tubewell within sansad XII at Dhananjaypur |
150000 |
Installation of Three numbers Tubewell within sansad XII at Dhananjaypur1 |
Completion of work |
-
latitude : 24.421930415555835
Longitude : 87.81794526614249
file name : Image_31052023131908905.png
|
2023-05-31 13:19:09.001911 |
438 |
56840003 |
Construction of CC road from Aju Sk house to Munna house at Dumurgram |
140000 |
Construction of CC road from Aju Sk house to Munna house at Dumurgram1 |
Completion of work |
-
latitude : 24.303295011632144,24.448884017765522
Longitude : 87.84055109135807,87.83891142345965
file name : Image_28062023173626556.png
|
2023-06-28 17:36:26.459406 |
439 |
56840003 |
Construction of CC road from Aju Sk house to Munna house at Dumurgram |
140000 |
Construction of CC road from Aju Sk house to Munna house at Dumurgram1 |
Completion of work |
-
latitude : 24.448899272829294,24.44887362420559
Longitude : 87.83897009678185,87.83893061801791
file name : Image_26072023114631256.png
|
2023-07-26 11:46:31.374338 |
440 |
56840003 |
Construction of CC road from Aju Sk house to Munna house at Dumurgram |
140000 |
Construction of CC road from Aju Sk house to Munna house at Dumurgram1 |
Completion of work |
-
latitude : 24.448901871219277,24.44889801554382
Longitude : 87.83897227607667,87.83898065797985
file name : Image_26072023114347079.png
|
2023-07-26 11:43:47.250981 |
441 |
56796096 |
Construction of pucca drain from Panna Mia house towards Barjahan house at Baliara |
148183 |
Construction of pucca drain from Panna Mia house towards Barjahan house at Baliara1 |
Completion of work |
-
latitude : 24.4481816,24.4481863
Longitude : 87.8242959,87.8242925
file name : Image_31052023115731303.png
|
2023-05-31 11:57:31.398546 |
442 |
56804470 |
Construction of CC road from Rakibul house towards Rakib Sk house at Moloypur |
240000 |
Construction of CC road from Rakibul house towards Rakib Sk house at Moloypur1 |
Completion of work |
-
latitude : 24.446146027185023,24.446221715770662
Longitude : 87.80390121974051,87.80374229885638
file name : Image_31052023112158831.png
|
2023-05-31 11:21:58.930954 |
443 |
56793947 |
Installation of Two numbers Tubewell within Sansad III at Baliara |
100000 |
Installation of Two numbers Tubewell within Sansad III at Baliara1 |
Completion of work |
-
latitude : 24.4241165
Longitude : 87.8345639
file name : Image_08062023124710719.png
|
2023-06-08 12:47:10.8039 |
444 |
56842270 |
Construction of CC road from Ekari Mal house to Kalitala at Tapna |
113016 |
Construction of CC road from Ekari Mal house to Kalitala at Tapna1 |
Completion of work |
-
latitude : 24.40718430094421,24.407119508832693
Longitude : 87.83813777379692,87.83813056536019
file name : Image_01062023172852120.png
|
2023-06-01 17:28:52.214633 |
445 |
56842270 |
Construction of CC road from Ekari Mal house to Kalitala at Tapna |
113016 |
Construction of CC road from Ekari Mal house to Kalitala at Tapna1 |
Plinth level |
-
latitude : 24.40714473836124,24.407185642048717
Longitude : 87.838079854846,87.8380899131298
file name : Image_08062023135145496.png
|
2023-06-08 13:51:45.59824 |
446 |
56841566 |
Construction of CC road from Abu house to Soyod Sk house at Bahadurpu |
100000 |
Construction of CC road from Abu house to Soyod Sk house at Bahadurpu1 |
Completion of work |
-
latitude : 24.42372104153037,24.42372104153037
Longitude : 87.8361701220274,87.83620071597397
file name : Image_13062023131543852.png
|
2023-06-13 13:15:43.960323 |
447 |
56841566 |
Construction of CC road from Abu house to Soyod Sk house at Bahadurpu |
100000 |
Construction of CC road from Abu house to Soyod Sk house at Bahadurpu1 |
Completion of work |
-
latitude : 24.4295452,24.42370507400483,24.423725316300988
Longitude : 87.8321035,87.83610180951655,87.83622125163674
file name : Image_09062023133357503.png
|
2023-06-09 13:33:57.599323 |
448 |
46808012 |
Installation of Solar Pump near Jolly Pukurpar at Dumurgram |
450000 |
Installation of Solar Pump near Jolly Pukurpar at Dumurgram1 |
Completion of work |
-
latitude : 24.4241155
Longitude : 87.8346065
file name : Image_20072023153940589.png
|
2023-07-20 15:39:40.691124 |
449 |
56805941 |
Installation of Ten numbers Solar Street Light within Sansad V at Dumurgram |
250000 |
Installation of Ten numbers Solar Street Light within Sansad V at Dumurgram1 |
Completion of work |
-
latitude : 24.4241191
Longitude : 87.8346023
file name : Image_24072023142318726.png
|
2023-07-24 14:23:18.963203 |
450 |
56798266 |
Construction of CC road with drain from Bhim Konai house to Apurba Bhattacharjee house at Kanakpu |
150000 |
Construction of CC road with drain from Bhim Konai house to Apurba Bhattacharjee house at Kanakpu1 |
Completion of work |
-
latitude : 24.4241154,24.4241154
Longitude : 87.8346061,87.8346057
file name : Image_20072023130753164.png
|
2023-07-20 13:07:53.267238 |
451 |
56800951 |
Maintenance of water supply pipe line |
233360 |
Maintenance of water supply pipe line 1 |
Plinth level |
-
latitude : 24.4240966
Longitude : 87.8346206
file name : Image_18032024160628453.png
|
2024-03-18 16:06:28.535681 |
452 |
56800951 |
Maintenance of water supply pipe line |
233360 |
Maintenance of water supply pipe line 1 |
Plinth level |
-
latitude : 24.4240925
Longitude : 87.834661
file name : Image_18032024160534527.png
|
2024-03-18 16:05:34.618055 |
453 |
56800951 |
Maintenance of water supply pipe line |
233360 |
Maintenance of water supply pipe line 1 |
Completion of work |
-
latitude : 24.4240921
Longitude : 87.8346505
file name : Image_20072023150512533.png
|
2023-07-20 15:05:12.629494 |
454 |
56804755 |
Construction of CC of road from Jamerul Momin house to Sukuddi Momin house at Baliara |
100000 |
Construction of CC of road from Jamerul Momin house to Sukuddi Momin house at Baliara1 |
Completion of work |
-
latitude : 24.44567902944982,24.445746042765677
Longitude : 87.82604067586362,87.8260091599077
file name : Image_27072023130230536.png
|
2023-07-27 13:02:30.699104 |
455 |
56806124 |
Construction of CC road from Basar Sk house to Motahar Sk house at Dumurgram |
100000 |
Construction of CC road from Basar Sk house to Motahar Sk house at Dumurgram1 |
Completion of work |
-
latitude : 24.44837079383433,24.448408763855696
Longitude : 87.83964307978749,87.83961944282055
file name : Image_27072023130951821.png
|
2023-07-27 13:09:51.921028 |
456 |
56806124 |
Construction of CC road from Basar Sk house to Motahar Sk house at Dumurgram |
100000 |
Construction of CC road from Basar Sk house to Motahar Sk house at Dumurgram1 |
Completion of work |
-
latitude : 24.44839505944401,24.448410817421973
Longitude : 87.83964433707297,87.83957619220018
file name : Image_27072023130628374.png
|
2023-07-27 13:06:28.46335 |
457 |
56793571 |
Construction of drain from Idgah towards Fazol house at Baliara |
100000 |
Construction of drain from Idgah towards Fazol house at Baliara1 |
Completion of work |
-
latitude : 24.446393796242774,24.446479668840766
Longitude : 87.82344278879464,87.82356575131416
file name : Image_31072023164654255.png
|
2023-07-31 16:46:54.342836 |
458 |
57003417 |
Installation of Four numbers Solar Street Light within Sansad II and Police Camp at Kanakpur IBRD |
100000 |
Installation of Four numbers Solar Street Light within Sansad II and Police Camp at Kanakpur IBRD1 |
Completion of work |
-
latitude : 24.4241157
Longitude : 87.8345976
file name : Image_08082023143605982.png
|
2023-08-08 14:36:06.104714 |
459 |
56842003 |
Installation of Four numbers Solar Street Light within Sansad XV at Singhanagar |
100000 |
Installation of Four numbers Solar Street Light within Sansad XV at Singhanagar1 |
Completion of work |
-
latitude : 24.4241159
Longitude : 87.8345969
file name : Image_08082023143111643.png
|
2023-08-08 14:31:11.748002 |
460 |
56800328 |
Installation of Two numbers Tubewell within Sansad XVI at Bahadurpur |
100000 |
Installation of Two numbers Tubewell within Sansad XVI at Bahadurpur1 |
Completion of work |
-
latitude : 24.4241151
Longitude : 87.8345996
file name : Image_08082023140955598.png
|
2023-08-08 14:09:55.686876 |
461 |
56841239 |
Installation of Four numbers Solar Street Light within Sansad XIII at Dhananjaypur |
100000 |
Installation of Four numbers Solar Street Light within Sansad XIII at Dhananjaypur1 |
Completion of work |
-
latitude : 24.4241157
Longitude : 87.8345983
file name : Image_08082023152301953.png
|
2023-08-08 15:23:02.05214 |
462 |
56800710 |
Installation of Two numbers Tubewell within Sansad XVII at Tapna |
100000 |
Installation of Two numbers Tubewell within Sansad XVII at Tapna1 |
Completion of work |
-
latitude : 24.4241158
Longitude : 87.8346025
file name : Image_08082023142843130.png
|
2023-08-08 14:28:43.266151 |
463 |
68206060 |
Operation and Maintenance of piped water supply system |
233361 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 24.4241058,24.4240842
Longitude : 87.8345621,87.8345487
file name : Image_04072024124853075.png
|
2024-07-04 12:48:53.165971 |
464 |
68206060 |
Operation and Maintenance of piped water supply system |
233361 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 24.42416,24.42416
Longitude : 87.8345957,87.8345957
file name : Image_03072024140432486.png
|
2024-07-03 14:04:32.565477 |
465 |
68206060 |
Operation and Maintenance of piped water supply system |
233361 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 24.4241182,24.4241194
Longitude : 87.8346422,87.8346362
file name : Image_14032024155429773.png
|
2024-03-14 15:54:29.848943 |
466 |
68206060 |
Operation and Maintenance of piped water supply system |
233361 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 24.4241236,24.4241236
Longitude : 87.8346437,87.8346437
file name : Image_14032024155313808.png
|
2024-03-14 15:53:13.892375 |
467 |
68206060 |
Operation and Maintenance of piped water supply system |
233361 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 24.424108,24.4241249
Longitude : 87.8346487,87.8346424
file name : Image_14032024155208475.png
|
2024-03-14 15:52:08.556958 |
468 |
68206060 |
Operation and Maintenance of piped water supply system |
233361 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 24.4241166,24.4241177
Longitude : 87.8346504,87.8346625
file name : Image_09082023152755614.png
|
2023-08-09 15:27:55.762561 |
469 |
68206060 |
Operation and Maintenance of piped water supply system |
233361 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 24.4241146,24.42412
Longitude : 87.8347177,87.8347244
file name : Image_03082023170928855.png
|
2023-08-03 17:09:29.004798 |
470 |
56806280 |
Installation of Nine numbers Solar Street Light within Sansad VI at dumurgram |
240000 |
Installation of Nine numbers Solar Street Light within Sansad VI at dumurgram1 |
Completion of work |
-
latitude : 24.4241162
Longitude : 87.8345978
file name : Image_08082023152512046.png
|
2023-08-08 15:25:12.130881 |
471 |
56801497 |
Maintenance of tube well Phase II |
500000 |
Maintenance of tube well Phase II1 |
Roof laid |
-
latitude : 24.424287155270576
Longitude : 87.83470907248557
file name : Image_29122023164423420.png
|
2023-12-29 16:44:23.505623 |
472 |
56801497 |
Maintenance of tube well Phase II |
500000 |
Maintenance of tube well Phase II1 |
Plinth level |
-
latitude : 24.42451241891831
Longitude : 87.8347017802298
file name : Image_29122023164151633.png
|
2023-12-29 16:41:51.720206 |
473 |
56801497 |
Maintenance of tube well Phase II |
500000 |
Maintenance of tube well Phase II1 |
Completion of work |
-
latitude : 24.424110003747046
Longitude : 87.83474234864116
file name : Image_29122023163706392.png
|
2023-12-29 16:37:06.476386 |
474 |
56801497 |
Maintenance of tube well Phase II |
500000 |
Maintenance of tube well Phase II1 |
Completion of work |
-
latitude : 24.4241606
Longitude : 87.8345973
file name : Image_29122023161522623.png
|
2023-12-29 16:15:22.705694 |
475 |
56801497 |
Maintenance of tube well Phase II |
500000 |
Maintenance of tube well Phase II1 |
Completion of work |
-
latitude : 24.4240888
Longitude : 87.8346352
file name : Image_20072023150312015.png
|
2023-07-20 15:03:12.099055 |
476 |
67433477 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.4481774,24.4486405
Longitude : 87.824319,87.8235449
file name : Image_06012024152033868.png
|
2024-01-06 15:20:33.951268 |
477 |
67433477 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.4241035,24.4241035
Longitude : 87.8346641,87.8346641
file name : Image_02012024140111166.png
|
2024-01-02 14:01:11.261684 |
478 |
67433477 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.449058235622942,24.44892341271043,24.448901158757508
Longitude : 87.82400093972683,87.82405936159194,87.82403530552983
file name : Image_28122023165330937.png
|
2023-12-28 16:53:30.741885 |
479 |
68206282 |
Operation and Maintenance of drinking water supply system |
450000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 24.4241104
Longitude : 87.8345547
file name : Image_04072024155910985.png
|
2024-07-04 15:59:11.070153 |
480 |
68206282 |
Operation and Maintenance of drinking water supply system |
450000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 24.4240872
Longitude : 87.8345547
file name : Image_04072024154546353.png
|
2024-07-04 15:45:46.454527 |
481 |
68206282 |
Operation and Maintenance of drinking water supply system |
450000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.4241191
Longitude : 87.8346436
file name : Image_02012024161053218.png
|
2024-01-02 16:10:53.31025 |
482 |
56806455 |
Construction of pucca drain from Fulalum house towards Rofik Ali house at Dumurgram |
90000 |
Construction of pucca drain from Fulalum house towards Rofik Ali house at Dumurgram1 |
Completion of work |
-
latitude : 24.4241182,24.4241182
Longitude : 87.8346494,87.8346494
file name : Image_02012024152922550.png
|
2024-01-02 15:29:22.69176 |
483 |
68205066 |
Creation of a new source of drinking water |
50000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.42314130719751
Longitude : 87.84546263515949
file name : Image_04092024132147797.png
|
2024-09-04 13:21:55.417599 |
484 |
46994683 |
Construction of pucca ghat near Id-gaha at Bolhar pond at Dumurgram |
200000 |
Construction of pucca ghat near Id-gaha at Bolhar pond at Dumurgram1 |
Roof laid |
-
latitude : 24.4240977
Longitude : 87.8346716
file name : Image_10012024151116438.png
|
2024-01-10 15:11:16.549672 |
485 |
46994683 |
Construction of pucca ghat near Id-gaha at Bolhar pond at Dumurgram |
200000 |
Construction of pucca ghat near Id-gaha at Bolhar pond at Dumurgram1 |
Plinth level |
-
latitude : 24.424099
Longitude : 87.834639
file name : Image_09012024131814052.png
|
2024-01-09 13:18:14.135575 |
486 |
46994683 |
Construction of pucca ghat near Id-gaha at Bolhar pond at Dumurgram |
200000 |
Construction of pucca ghat near Id-gaha at Bolhar pond at Dumurgram1 |
Completion of work |
-
latitude : 24.4240975
Longitude : 87.834641
file name : Image_09012024131556128.png
|
2024-01-09 13:15:56.211535 |
487 |
56797937 |
Construction of pucca drain from Mainur house towards Munna house at Dumurgram |
160000 |
Construction of pucca drain from Mainur house towards Munna house at Dumurgram1 |
Plinth level |
-
latitude : 24.424094,24.4240941
Longitude : 87.8346689,87.8346756
file name : Image_30012024123815146.png
|
2024-01-30 12:38:15.233512 |
488 |
56797937 |
Construction of pucca drain from Mainur house towards Munna house at Dumurgram |
160000 |
Construction of pucca drain from Mainur house towards Munna house at Dumurgram1 |
Plinth level |
-
latitude : 24.4240904,24.4240904
Longitude : 87.8346646,87.8346646
file name : Image_30012024123714909.png
|
2024-01-30 12:37:14.999009 |
489 |
56797937 |
Construction of pucca drain from Mainur house towards Munna house at Dumurgram |
160000 |
Construction of pucca drain from Mainur house towards Munna house at Dumurgram1 |
Completion of work |
-
latitude : 24.424122,24.4241248
Longitude : 87.8346257,87.8346107
file name : Image_30012024114627753.png
|
2024-01-30 11:46:27.855127 |
490 |
56797937 |
Construction of pucca drain from Mainur house towards Munna house at Dumurgram |
160000 |
Construction of pucca drain from Mainur house towards Munna house at Dumurgram1 |
Completion of work |
-
latitude : 24.4241257,24.4241257
Longitude : 87.8346112,87.8346112
file name : Image_30012024114521093.png
|
2024-01-30 11:45:21.206493 |
491 |
56797937 |
Construction of pucca drain from Mainur house towards Munna house at Dumurgram |
160000 |
Construction of pucca drain from Mainur house towards Munna house at Dumurgram1 |
Completion of work |
-
latitude : 24.424122,24.4241248
Longitude : 87.8346257,87.8346107
file name : Image_30012024114634380.png
|
2024-01-30 11:46:34.493982 |
492 |
56797937 |
Construction of pucca drain from Mainur house towards Munna house at Dumurgram |
160000 |
Construction of pucca drain from Mainur house towards Munna house at Dumurgram1 |
Completion of work |
-
latitude : 24.449377334676683,24.44933010265231
Longitude : 87.83916162326932,87.83920018002391
file name : Image_26072023114138820.png
|
2023-07-26 11:41:38.917713 |
493 |
56797515 |
Construction of pucca drain from Md Motahar Hossain house towards Md Ali Hasan house at Dumurgram |
150000 |
Construction of pucca drain from Md Motahar Hossain house towards Md Ali Hasan house at Dumurgram1 |
Plinth level |
-
latitude : 24.450066746212542,24.450085102580488
Longitude : 87.83573401160538,87.83569721505046
file name : Image_30012024114622477.png
|
2024-01-30 11:46:22.567001 |
494 |
56797515 |
Construction of pucca drain from Md Motahar Hossain house towards Md Ali Hasan house at Dumurgram |
150000 |
Construction of pucca drain from Md Motahar Hossain house towards Md Ali Hasan house at Dumurgram1 |
Plinth level |
-
latitude : 24.4503384,24.45007181726396
Longitude : 87.8357082,87.83576016314328
file name : Image_30012024110022841.png
|
2024-01-30 11:00:22.935937 |
495 |
56797515 |
Construction of pucca drain from Md Motahar Hossain house towards Md Ali Hasan house at Dumurgram |
150000 |
Construction of pucca drain from Md Motahar Hossain house towards Md Ali Hasan house at Dumurgram1 |
Plinth level |
-
latitude : 24.4503379,24.4503379
Longitude : 87.8357126,87.8357126
file name : Image_30012024110011844.png
|
2024-01-30 11:00:11.937796 |
496 |
56797515 |
Construction of pucca drain from Md Motahar Hossain house towards Md Ali Hasan house at Dumurgram |
150000 |
Construction of pucca drain from Md Motahar Hossain house towards Md Ali Hasan house at Dumurgram1 |
Plinth level |
-
latitude : 24.4503383,24.450032212771475
Longitude : 87.8357091,87.83566712401807
file name : Image_30012024105949793.png
|
2024-01-30 10:59:49.883025 |
497 |
56797515 |
Construction of pucca drain from Md Motahar Hossain house towards Md Ali Hasan house at Dumurgram |
150000 |
Construction of pucca drain from Md Motahar Hossain house towards Md Ali Hasan house at Dumurgram1 |
Completion of work |
-
latitude : 24.4502823,24.4502823
Longitude : 87.8357619,87.8357619
file name : Image_28122023170826373.png
|
2023-12-28 17:08:26.415137 |
498 |
68161708 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.451065910980105
Longitude : 87.84117219038308
file name : Image_17012024110505972.png
|
2024-01-17 11:05:06.056269 |
499 |
68161708 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.45105107501149
Longitude : 87.84115525893867
file name : Image_17012024110414248.png
|
2024-01-17 11:04:14.336996 |
500 |
68161708 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.45096164010465
Longitude : 87.84149631857872
file name : Image_20122023112956625.png
|
2023-12-20 11:29:56.7084 |
501 |
68161746 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.45092828013003
Longitude : 87.83596727997065
file name : Image_06012024162715590.png
|
2024-01-06 16:27:15.685611 |
502 |
68161746 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.450928908772767
Longitude : 87.83599452115595
file name : Image_06012024161315315.png
|
2024-01-06 16:13:15.41017 |
503 |
68161746 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.450938464142382
Longitude : 87.83592713065445
file name : Image_19122023105720028.png
|
2023-12-19 10:57:20.122736 |
504 |
68162279 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.43150711711496
Longitude : 87.80097057111561
file name : Image_18122023145324356.png
|
2023-12-18 14:53:24.442224 |
505 |
68162650 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.41407112404704
Longitude : 87.818319266662
file name : Image_29012024121648817.png
|
2024-01-29 12:16:48.902555 |
506 |
68162650 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.414080218411982
Longitude : 87.81845136545599
file name : Image_29012024121556183.png
|
2024-01-29 12:15:56.271376 |
507 |
68162650 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.413975779898465
Longitude : 87.81843518838286
file name : Image_11012024160620001.png
|
2024-01-11 16:06:20.091947 |
508 |
68204781 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.4240985
Longitude : 87.8346687
file name : Image_11012024155439997.png
|
2024-01-11 15:54:40.094741 |
509 |
68204781 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.4240985
Longitude : 87.8346687
file name : Image_11012024155523085.png
|
2024-01-11 15:55:23.160984 |
510 |
68204781 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.41686485428363
Longitude : 87.8254478238523
file name : Image_18122023141713048.png
|
2023-12-18 14:17:13.157101 |
511 |
68205709 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.406988499686122
Longitude : 87.83479599282146
file name : Image_18012024124352774.png
|
2024-01-18 12:43:52.861044 |
512 |
68205709 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.40703112166375
Longitude : 87.83483966253698
file name : Image_18012024124308695.png
|
2024-01-18 12:43:08.778768 |
513 |
68205709 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.40704013220966
Longitude : 87.83483396284282
file name : Image_02012024150110010.png
|
2024-01-02 15:01:10.129272 |
514 |
67414999 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.4240977,24.4240977
Longitude : 87.8346716,87.8346716
file name : Image_10012024152252470.png
|
2024-01-10 15:22:52.565101 |
515 |
67414999 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.4240977,24.4240977
Longitude : 87.8346716,87.8346716
file name : Image_10012024145900053.png
|
2024-01-10 14:59:00.136293 |
516 |
67414999 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.423891655169427,24.446477238088846
Longitude : 87.83458351157606,87.8247398044914
file name : Image_16122023133100543.png
|
2023-12-16 13:31:00.637429 |
517 |
67433324 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.4241035,24.4241035
Longitude : 87.8346641,87.8346641
file name : Image_02012024140538229.png
|
2024-01-02 14:05:38.331537 |
518 |
67433324 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.439937635324895,24.439948447979987
Longitude : 87.83030069433153,87.83028468489647
file name : Image_18122023151108368.png
|
2023-12-18 15:11:08.458893 |
519 |
67596073 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.4553604,24.4553604
Longitude : 87.8463202,87.8463202
file name : Image_24012024103625349.png
|
2024-01-24 10:36:25.431376 |
520 |
67596073 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.4553604,24.4553604
Longitude : 87.8463202,87.8463202
file name : Image_24012024103536313.png
|
2024-01-24 10:35:36.294588 |
521 |
67596073 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.4506414,24.4506414
Longitude : 87.8383104,87.8383104
file name : Image_20122023111516616.png
|
2023-12-20 11:15:16.74312 |
522 |
67608213 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.4495423,24.449504991061985
Longitude : 87.8373785,87.83666121773422
file name : Image_06012024161252718.png
|
2024-01-06 16:12:52.808966 |
523 |
67608213 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.449495100416243,24.4495012
Longitude : 87.83663741312921,87.8374652
file name : Image_06012024160045445.png
|
2024-01-06 16:00:45.543496 |
524 |
67608213 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.449400971643627,24.449446485377848,24.44941874127835
Longitude : 87.83609317615628,87.83609258942306,87.83608915284276
file name : Image_16122023153928512.png
|
2023-12-16 15:39:28.604638 |
525 |
67609052 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.4241082,24.4241082
Longitude : 87.8346165,87.8346165
file name : Image_05012024163007416.png
|
2024-01-05 16:30:07.496551 |
526 |
67609052 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.427598509937525,24.427570807747543
Longitude : 87.80143610201776,87.80143165960908
file name : Image_18122023144152168.png
|
2023-12-18 14:41:52.259969 |
527 |
67608958 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.4240987,24.4240987
Longitude : 87.8346664,87.8346664
file name : Image_11012024145803763.png
|
2024-01-11 14:58:03.843769 |
528 |
67608958 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.4240982,24.4240993
Longitude : 87.8346691,87.8346644
file name : Image_11012024145712334.png
|
2024-01-11 14:57:12.420847 |
529 |
67608958 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.43089025095105,24.430903871543705
Longitude : 87.80153207480907,87.80157540924847
file name : Image_18122023145722637.png
|
2023-12-18 14:57:22.731772 |
530 |
67610622 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.42281956784427,24.422819232568145
Longitude : 87.83629216253757,87.83626391552389
file name : Image_18012024123523228.png
|
2024-01-18 12:35:23.314029 |
531 |
67610622 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.428803,24.422807414084673,24.422838427126408
Longitude : 87.8321035,87.83622083254158,87.83624245785177
file name : Image_18012024123437920.png
|
2024-01-18 12:34:38.008334 |
532 |
67610622 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.422818394377828,24.42283872049302
Longitude : 87.83634237013757,87.83635075204074
file name : Image_28122023125011360.png
|
2023-12-28 12:50:11.447447 |
533 |
67758626 |
Installation of Computer with Internet facility |
488480 |
Installation of Computer with Internet facility1 |
|
-
latitude : 24.4240874
Longitude : 87.8346165
file name : Image_24042024162132381.png
|
2024-04-24 16:21:32.463723 |
534 |
67610331 |
Electricity/Solar Power Installation |
100000 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 24.4241268
Longitude : 87.8345864
file name : Image_14032024154634919.png
|
2024-03-14 15:46:34.986591 |
535 |
67610331 |
Electricity/Solar Power Installation |
100000 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 24.4241276
Longitude : 87.8345921
file name : Image_14032024154456776.png
|
2024-03-14 15:44:56.850743 |
536 |
67610331 |
Electricity/Solar Power Installation |
100000 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 24.4241271
Longitude : 87.8345968
file name : Image_14032024150041324.png
|
2024-03-14 15:00:41.411754 |
537 |
67610331 |
Electricity/Solar Power Installation |
100000 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 24.4241387
Longitude : 87.8345891
file name : Image_14032024145949464.png
|
2024-03-14 14:59:49.554667 |
538 |
67610331 |
Electricity/Solar Power Installation |
100000 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 24.4241285
Longitude : 87.8346061
file name : Image_14032024145854484.png
|
2024-03-14 14:58:54.576377 |
539 |
68205163 |
Creation of a new source of drinking water |
50000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.4241254
Longitude : 87.8345872
file name : Image_14032024152255599.png
|
2024-03-14 15:22:55.692029 |
540 |
68205163 |
Creation of a new source of drinking water |
50000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.4241358
Longitude : 87.8345828
file name : Image_14032024152300939.png
|
2024-03-14 15:23:01.028556 |
541 |
68205163 |
Creation of a new source of drinking water |
50000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.4241275
Longitude : 87.8345982
file name : Image_14032024152240437.png
|
2024-03-14 15:22:40.524807 |
542 |
68205163 |
Creation of a new source of drinking water |
50000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.4241367
Longitude : 87.8345868
file name : Image_14032024152250359.png
|
2024-03-14 15:22:50.443009 |
543 |
68205163 |
Creation of a new source of drinking water |
50000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.4241261
Longitude : 87.8345939
file name : Image_14032024152245436.png
|
2024-03-14 15:22:45.520323 |
544 |
68205163 |
Creation of a new source of drinking water |
50000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.419733518734574
Longitude : 87.84164526499808
file name : Image_29012024155322487.png
|
2024-01-29 15:53:22.579308 |
545 |
68205163 |
Creation of a new source of drinking water |
50000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.419727441854775
Longitude : 87.84164258278906
file name : Image_29012024155219468.png
|
2024-01-29 15:52:19.564473 |
546 |
68205163 |
Creation of a new source of drinking water |
50000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.419761304743588
Longitude : 87.8417222108692
file name : Image_29012024155124399.png
|
2024-01-29 15:51:24.528974 |
547 |
67596397 |
Electricity connection /Installation of Solar Energy |
50000 |
Electricity connection /Installation of Solar Energy1 |
Plinth level |
-
latitude : 24.4241258
Longitude : 87.8345937
file name : Image_24052024140227484.png
|
2024-05-24 14:02:27.570311 |
548 |
67596397 |
Electricity connection /Installation of Solar Energy |
50000 |
Electricity connection /Installation of Solar Energy1 |
Plinth level |
-
latitude : 24.4241266
Longitude : 87.834593
file name : Image_24052024135645775.png
|
2024-05-24 13:56:45.861244 |
549 |
67596397 |
Electricity connection /Installation of Solar Energy |
50000 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 24.4241251
Longitude : 87.8345787
file name : Image_24052024134502672.png
|
2024-05-24 13:45:02.766175 |
550 |
67596397 |
Electricity connection /Installation of Solar Energy |
50000 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 24.4241173
Longitude : 87.8345716
file name : Image_24052024134322905.png
|
2024-05-24 13:43:22.987537 |
551 |
67596397 |
Electricity connection /Installation of Solar Energy |
50000 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 24.4241178
Longitude : 87.8345721
file name : Image_24052024134412978.png
|
2024-05-24 13:44:13.072653 |
552 |
56801383 |
Maintenance of tube well Phase I |
500000 |
Maintenance of tube well Phase I1 |
Roof laid |
-
latitude : 24.424050827510655
Longitude : 87.8346914704889
file name : Image_29122023164304518.png
|
2023-12-29 16:43:04.603209 |
553 |
56801383 |
Maintenance of tube well Phase I |
500000 |
Maintenance of tube well Phase I1 |
Plinth level |
-
latitude : 24.42413150332868
Longitude : 87.83472575247288
file name : Image_29122023163543139.png
|
2023-12-29 16:35:43.224507 |
554 |
56801383 |
Maintenance of tube well Phase I |
500000 |
Maintenance of tube well Phase I1 |
Completion of work |
-
latitude : 24.42409550305456
Longitude : 87.83457018435001
file name : Image_29122023162911996.png
|
2023-12-29 16:29:12.084257 |
555 |
56801383 |
Maintenance of tube well Phase I |
500000 |
Maintenance of tube well Phase I1 |
Completion of work |
-
latitude : 24.4241606
Longitude : 87.8345973
file name : Image_29122023161300363.png
|
2023-12-29 16:13:00.449663 |
556 |
56801383 |
Maintenance of tube well Phase I |
500000 |
Maintenance of tube well Phase I1 |
Completion of work |
-
latitude : 24.4240878
Longitude : 87.8346363
file name : Image_20072023150416269.png
|
2023-07-20 15:04:16.369088 |
557 |
46808360 |
Maintenance of tube well Phase -I |
500000 |
Maintenance of tube well Phase -I1 |
Plinth level |
-
latitude : 24.4240933
Longitude : 87.8346094
file name : Image_17082022123111688.png
|
2022-08-17 12:31:11.785024 |
558 |
46808360 |
Maintenance of tube well Phase -I |
500000 |
Maintenance of tube well Phase -I1 |
Plinth level |
-
latitude : 24.4240934
Longitude : 87.8346088
file name : Image_17082022123031146.png
|
2022-08-17 12:30:31.252539 |
559 |
46808360 |
Maintenance of tube well Phase -I |
500000 |
Maintenance of tube well Phase -I1 |
Plinth level |
-
latitude : 24.4240934
Longitude : 87.8346112
file name : Image_17082022123145349.png
|
2022-08-17 12:31:45.475714 |
560 |
46808360 |
Maintenance of tube well Phase -I |
500000 |
Maintenance of tube well Phase -I1 |
Completion of work |
-
latitude : 24.4240477
Longitude : 87.8346404
file name : Image_15022022160815933.png
|
2022-02-15 16:08:16.024988 |
561 |
46808360 |
Maintenance of tube well Phase -I |
500000 |
Maintenance of tube well Phase -I1 |
Completion of work |
-
latitude : 24.4240479
Longitude : 87.8346452
file name : Image_15022022160623506.png
|
2022-02-15 16:06:23.610216 |
562 |
56801147 |
Maintenance of water supply pipe line within Sansad I to IX and X |
153000 |
Maintenance of water supply pipe line within Sansad I to IX and X1 |
Plinth level |
-
latitude : 24.4240939
Longitude : 87.8346248
file name : Image_18032024160419784.png
|
2024-03-18 16:04:19.87098 |
563 |
56801147 |
Maintenance of water supply pipe line within Sansad I to IX and X |
153000 |
Maintenance of water supply pipe line within Sansad I to IX and X1 |
Completion of work |
-
latitude : 24.424005
Longitude : 87.8346405
file name : Image_18032024155454626.png
|
2024-03-18 15:54:54.713871 |
564 |
56801147 |
Maintenance of water supply pipe line within Sansad I to IX and X |
153000 |
Maintenance of water supply pipe line within Sansad I to IX and X1 |
Completion of work |
-
latitude : 24.4240902
Longitude : 87.8346323
file name : Image_20072023150601126.png
|
2023-07-20 15:06:01.21938 |
565 |
68206122 |
Operation and Maintenance of drinking water supply system |
449999 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 24.4240799
Longitude : 87.8345465
file name : Image_04072024154214609.png
|
2024-07-04 15:42:14.708616 |
566 |
68206122 |
Operation and Maintenance of drinking water supply system |
449999 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 24.424068764783442
Longitude : 87.83471745438874
file name : Image_29122023165519010.png
|
2023-12-29 16:55:19.093864 |
567 |
68206122 |
Operation and Maintenance of drinking water supply system |
449999 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.424132341518998
Longitude : 87.83474226482213
file name : Image_29122023165219786.png
|
2023-12-29 16:52:19.868731 |
568 |
46808227 |
Maintenance of water supply pipe line |
200000 |
Maintenance of water supply pipe line1 |
Plinth level |
-
latitude : 24.4241084,24.4241049
Longitude : 87.8346382,87.8346379
file name : Image_18032024155706012.png
|
2024-03-18 15:57:06.092108 |
569 |
46808227 |
Maintenance of water supply pipe line |
200000 |
Maintenance of water supply pipe line1 |
Completion of work |
-
latitude : 24.4240918,24.4240876
Longitude : 87.8346118,87.8346078
file name : Image_17082022122858436.png
|
2022-08-17 12:28:58.536623 |
570 |
46808227 |
Maintenance of water supply pipe line |
200000 |
Maintenance of water supply pipe line1 |
Completion of work |
-
latitude : 24.4240923,24.4240803
Longitude : 87.834608,87.8346107
file name : Image_17082022122809492.png
|
2022-08-17 12:28:09.591523 |
571 |
46808227 |
Maintenance of water supply pipe line |
200000 |
Maintenance of water supply pipe line1 |
Completion of work |
-
latitude : 24.4240859,24.4240859
Longitude : 87.8346087,87.8346087
file name : Image_17082022122941673.png
|
2022-08-17 12:29:41.770293 |
572 |
67610698 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.4239876,24.4239876
Longitude : 87.8344931,87.8344931
file name : Image_07022024125829098.png
|
2024-02-07 12:58:29.187741 |
573 |
67610698 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.4239449,24.4187163
Longitude : 87.8344629,87.827497
file name : Image_07022024130009752.png
|
2024-02-07 13:00:09.84655 |
574 |
67610698 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.423702266067266,24.4238751
Longitude : 87.8339213412255,87.8350192
file name : Image_22122023123459594.png
|
2023-12-22 12:34:59.688327 |
575 |
68204874 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.42343249451369
Longitude : 87.84007038921118
file name : Image_10062024125331641.png
|
2024-06-10 12:53:31.713076 |
576 |
68204874 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.423465058207512
Longitude : 87.84013291820884
file name : Image_10062024125241318.png
|
2024-06-10 12:52:41.415673 |
577 |
68204874 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.42347075790167
Longitude : 87.8401092812419
file name : Image_10062024125155549.png
|
2024-06-10 12:51:55.633198 |
578 |
68204874 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.424076308496296
Longitude : 87.83938441425562
file name : Image_28122023124520366.png
|
2023-12-28 12:45:20.460273 |
579 |
67983244 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.44925189949572
Longitude : 87.80727661214769
file name : Image_01022024113440600.png
|
2024-02-01 11:34:40.699194 |
580 |
67983244 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.449377292767167
Longitude : 87.80719195492566
file name : Image_01022024113640979.png
|
2024-02-01 11:36:41.073773 |
581 |
67983244 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.44942833855748
Longitude : 87.80766611918807
file name : Image_06012024131220114.png
|
2024-01-06 13:12:20.213204 |
582 |
34068458 |
Upgradation of road from Zaman house to towards Munna House at Dumurgram |
148447 |
Upgradation of road from Zaman house to towards Munna House at Dumurgram 1 |
Completion of work |
-
latitude : 24.449177216738462,24.449190041050315
Longitude : 87.83873666077852,87.83874940127134
file name : Image_26082021161015371.png
|
2021-08-26 16:10:15.455903 |
583 |
34068458 |
Upgradation of road from Zaman house to towards Munna House at Dumurgram |
148447 |
Upgradation of road from Zaman house to towards Munna House at Dumurgram 1 |
Completion of work |
-
latitude : 24.449191885069013,24.449193477630615
Longitude : 87.83874470740557,87.83873875625432
file name : Image_26082021161018370.png
|
2021-08-26 16:10:18.468994 |
584 |
34068458 |
Upgradation of road from Zaman house to towards Munna House at Dumurgram |
148447 |
Upgradation of road from Zaman house to towards Munna House at Dumurgram 1 |
Completion of work |
-
latitude : 24.44920525420457,24.44916288368404
Longitude : 87.8387498203665,87.8387012053281
file name : Image_26082021161021446.png
|
2021-08-26 16:10:21.54181 |
585 |
68163093 |
Creation of a new source of drinking water |
98505 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.41370387095958
Longitude : 87.81905444338918
file name : Image_12092024125022717.png
|
2024-09-12 12:50:22.793922 |
586 |
68163093 |
Creation of a new source of drinking water |
98505 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.413739158771932
Longitude : 87.81907363794744
file name : Image_12092024124807562.png
|
2024-09-12 12:48:07.646964 |
587 |
68163093 |
Creation of a new source of drinking water |
98505 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.41371560562402
Longitude : 87.81906391493976
file name : Image_12092024124400007.png
|
2024-09-12 12:44:00.081613 |
588 |
98477357 |
Creation of a new source of drinking water |
375000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.460557200945914
Longitude : 87.8236602153629
file name : Image_17092024122441701.png
|
2024-09-17 12:24:41.786349 |
589 |
98477357 |
Creation of a new source of drinking water |
375000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.4241953
Longitude : 87.8346273
file name : Image_17092024122542414.png
|
2024-09-17 12:25:42.502998 |
590 |
98477357 |
Creation of a new source of drinking water |
375000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.4241945
Longitude : 87.834627
file name : Image_17092024122157921.png
|
2024-09-17 12:21:58.001815 |
591 |
98477604 |
Creation of a new source of drinking water |
375000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.4241926
Longitude : 87.8346318
file name : Image_17092024124821723.png
|
2024-09-17 12:48:21.806648 |
592 |
98477604 |
Creation of a new source of drinking water |
375000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.4241926
Longitude : 87.8346314
file name : Image_17092024124721016.png
|
2024-09-17 12:47:21.094798 |
593 |
98477604 |
Creation of a new source of drinking water |
375000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.424188
Longitude : 87.8346304
file name : Image_17092024124304344.png
|
2024-09-17 12:43:04.423699 |
594 |
98476927 |
Operation and Maintenance of drinking/piped water supply system |
260000 |
Operation and Maintenance of drinking/piped water supply system1 |
Roof laid |
-
latitude : 24.4241589
Longitude : 87.8345897
file name : Image_04072024131423933.png
|
2024-07-04 13:14:24.025445 |
595 |
98476927 |
Operation and Maintenance of drinking/piped water supply system |
260000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 24.4241549
Longitude : 87.8345931
file name : Image_04072024131049637.png
|
2024-07-04 13:10:49.726123 |
596 |
98476927 |
Operation and Maintenance of drinking/piped water supply system |
260000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 24.4241171
Longitude : 87.8345692
file name : Image_04072024124518821.png
|
2024-07-04 12:45:18.962449 |
597 |
98476927 |
Operation and Maintenance of drinking/piped water supply system |
260000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 24.4240992
Longitude : 87.8345571
file name : Image_04072024124422935.png
|
2024-07-04 12:44:23.028339 |
598 |
98476927 |
Operation and Maintenance of drinking/piped water supply system |
260000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 24.4240679
Longitude : 87.8345311
file name : Image_04072024124613519.png
|
2024-07-04 12:46:13.608635 |
599 |
98476927 |
Operation and Maintenance of drinking/piped water supply system |
260000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 24.4240795
Longitude : 87.8345444
file name : Image_04072024124732538.png
|
2024-07-04 12:47:32.626064 |
600 |
68206320 |
Operation and Maintenance of drinking water supply system |
450000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 24.4240959
Longitude : 87.8345558
file name : Image_04072024160405713.png
|
2024-07-04 16:04:05.792206 |
601 |
68206320 |
Operation and Maintenance of drinking water supply system |
450000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 24.4240854
Longitude : 87.8345487
file name : Image_04072024155711975.png
|
2024-07-04 15:57:12.052513 |
602 |
68206320 |
Operation and Maintenance of drinking water supply system |
450000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.4240755
Longitude : 87.8345383
file name : Image_04072024154052114.png
|
2024-07-04 15:40:52.204982 |
603 |
68206414 |
Operation and Maintenance of drinking water supply system |
400360 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 24.4240775
Longitude : 87.8345406
file name : Image_04072024160447653.png
|
2024-07-04 16:04:47.744869 |
604 |
68206414 |
Operation and Maintenance of drinking water supply system |
400360 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 24.4241402
Longitude : 87.8345766
file name : Image_04072024155812936.png
|
2024-07-04 15:58:13.018427 |
605 |
68206414 |
Operation and Maintenance of drinking water supply system |
400360 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.4240788
Longitude : 87.834549
file name : Image_04072024154136086.png
|
2024-07-04 15:41:36.179577 |
606 |
67983657 |
Creation of a new source of drinking water |
98406 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.4241505
Longitude : 87.8346202
file name : Image_24092024130431776.png
|
2024-09-24 13:04:31.865021 |
607 |
67983657 |
Creation of a new source of drinking water |
98406 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.4241372
Longitude : 87.8346092
file name : Image_24092024130330925.png
|
2024-09-24 13:03:31.008182 |
608 |
67983657 |
Creation of a new source of drinking water |
98406 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.423995087854564
Longitude : 87.8347244951874
file name : Image_24092024125828960.png
|
2024-09-24 12:58:29.050874 |
609 |
68205032 |
Creation of a new source of drinking water |
50000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.4241239
Longitude : 87.8345834
file name : Image_14032024153853621.png
|
2024-03-14 15:38:53.702019 |
610 |
68205032 |
Creation of a new source of drinking water |
50000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.424124
Longitude : 87.8346023
file name : Image_14032024150448627.png
|
2024-03-14 15:04:48.708969 |
611 |
68205032 |
Creation of a new source of drinking water |
50000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.4241262
Longitude : 87.8345931
file name : Image_14032024150304938.png
|
2024-03-14 15:03:05.028503 |
612 |
68205032 |
Creation of a new source of drinking water |
50000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.41988958977163
Longitude : 87.84045050852001
file name : Image_29012024155648792.png
|
2024-01-29 15:56:48.890314 |
613 |
68205032 |
Creation of a new source of drinking water |
50000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.419889338314533
Longitude : 87.84043449908495
file name : Image_29012024155606015.png
|
2024-01-29 15:56:06.138438 |
614 |
68205032 |
Creation of a new source of drinking water |
50000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.419864360243082
Longitude : 87.84043768420815
file name : Image_29012024155505119.png
|
2024-01-29 15:55:05.213397 |
615 |
67983474 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.439301784150302
Longitude : 87.8335782699287
file name : Image_14082024113201203.png
|
2024-08-14 11:32:01.304933 |
616 |
67983474 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.439300149679184
Longitude : 87.83352848142385
file name : Image_14082024113045766.png
|
2024-08-14 11:30:45.865595 |
617 |
67983474 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.43971874192357
Longitude : 87.8338510170579
file name : Image_09082024175623942.png
|
2024-08-09 17:56:24.020515 |
618 |
68162400 |
Creation of drainage channel for management of grey water |
98941 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.427069695666432
Longitude : 87.80136904679239
file name : Image_11092024163544503.png
|
2024-09-11 16:35:44.58615 |
619 |
68162400 |
Creation of drainage channel for management of grey water |
98941 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.42704170010984
Longitude : 87.8013875707984
file name : Image_11092024163702305.png
|
2024-09-11 16:37:02.39375 |
620 |
68162400 |
Creation of drainage channel for management of grey water |
98941 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.42699647974223
Longitude : 87.80138396658003
file name : Image_21082024120239527.png
|
2024-08-21 12:02:39.655737 |
621 |
67983974 |
Creation of drainage channel for management of grey water |
98951 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.45151853375137
Longitude : 87.84242888912559
file name : Image_11092024173227404.png
|
2024-09-11 17:32:27.494006 |
622 |
67983974 |
Creation of drainage channel for management of grey water |
98951 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.451480815187097
Longitude : 87.84240131266415
file name : Image_11092024173106890.png
|
2024-09-11 17:31:06.973825 |
623 |
67983974 |
Creation of drainage channel for management of grey water |
98951 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.45094869006425
Longitude : 87.84219109453261
file name : Image_22082024105044085.png
|
2024-08-22 10:50:44.170589 |
624 |
67983369 |
Creation of drainage channel for management of grey water |
98970 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.445173726417124
Longitude : 87.82631803303957
file name : Image_22082024112018992.png
|
2024-08-22 11:20:19.093223 |
625 |
67983369 |
Creation of drainage channel for management of grey water |
98970 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.445195184089243
Longitude : 87.8263215534389
file name : Image_22082024111254425.png
|
2024-08-22 11:12:54.525772 |
626 |
67983369 |
Creation of drainage channel for management of grey water |
98970 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.44518235977739
Longitude : 87.82631920650601
file name : Image_09082024174818690.png
|
2024-08-09 17:48:18.794784 |
627 |
68162330 |
Creation of drainage channel for management of grey water |
99000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.43289402872324
Longitude : 87.79998620040715
file name : Image_30082024114354299.png
|
2024-08-30 11:43:54.95251 |
628 |
68162330 |
Creation of drainage channel for management of grey water |
99000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.432938494719565
Longitude : 87.80000145547092
file name : Image_30082024114315519.png
|
2024-08-30 11:43:16.170562 |
629 |
68162330 |
Creation of drainage channel for management of grey water |
99000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.432917749509215
Longitude : 87.80005535110831
file name : Image_21082024112303669.png
|
2024-08-21 11:23:03.765817 |
630 |
68162212 |
Creation of drainage channel for management of grey water |
98990 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.449517815373838
Longitude : 87.83525372855365
file name : Image_08092024103816755.png
|
2024-09-08 10:39:38.854723 |
631 |
68162363 |
Creation of drainage channel for management of grey water |
99000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.429852277971804
Longitude : 87.80258802697062
file name : Image_22082024165956794.png
|
2024-08-22 16:59:56.889458 |
632 |
68162363 |
Creation of drainage channel for management of grey water |
99000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.43001794628799
Longitude : 87.80268131755292
file name : Image_22082024165940471.png
|
2024-08-22 16:59:40.56225 |
633 |
68162363 |
Creation of drainage channel for management of grey water |
99000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.43010352551937
Longitude : 87.80267276801169
file name : Image_22082024170035616.png
|
2024-08-22 17:00:35.710596 |
634 |
68162363 |
Creation of drainage channel for management of grey water |
99000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.42986434791237
Longitude : 87.8026188723743
file name : Image_19082024122836429.png
|
2024-08-19 12:28:36.533994 |
635 |
68162710 |
Creation of drainage channel for management of grey water |
98941 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.41377742215991
Longitude : 87.81901421025395
file name : Image_21082024144152745.png
|
2024-08-21 14:41:52.933235 |
636 |
68204732 |
Creation of drainage channel for management of grey water |
99000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.417722658254206
Longitude : 87.8269177582115
file name : Image_19082024124639929.png
|
2024-08-19 12:46:40.023413 |
637 |
68204732 |
Creation of drainage channel for management of grey water |
99000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.4241604
Longitude : 87.834651
file name : Image_20082024131821984.png
|
2024-08-20 13:18:22.092491 |
638 |
68204732 |
Creation of drainage channel for management of grey water |
99000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.417731962166727
Longitude : 87.82691004686058
file name : Image_19082024124711646.png
|
2024-08-19 12:47:11.733826 |
639 |
68204732 |
Creation of drainage channel for management of grey water |
99000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.417754719033837
Longitude : 87.82690920867026
file name : Image_19082024124602575.png
|
2024-08-19 12:46:02.659787 |
640 |
68204732 |
Creation of drainage channel for management of grey water |
99000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.417727016843855
Longitude : 87.82693955115974
file name : Image_19082024124519466.png
|
2024-08-19 12:45:19.559064 |
641 |
68204898 |
Creation of drainage channel for management of grey water |
98990 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.419127171859145
Longitude : 87.83771004527807
file name : Image_04092024133122081.png
|
2024-09-04 13:31:29.82258 |
642 |
68204898 |
Creation of drainage channel for management of grey water |
98990 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.419128177687526
Longitude : 87.83766553737223
file name : Image_04092024132952173.png
|
2024-09-04 13:29:59.884444 |
643 |
68204898 |
Creation of drainage channel for management of grey water |
98990 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.418266811408103
Longitude : 87.83728810027242
file name : Image_16082024172705166.png
|
2024-08-16 17:27:05.250027 |
644 |
68205689 |
Creation of drainage channel for management of grey water |
98970 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.40668733790517
Longitude : 87.83740569837391
file name : Image_05092024125122037.png
|
2024-09-05 12:51:22.142962 |
645 |
68205689 |
Creation of drainage channel for management of grey water |
98970 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.40666567068547
Longitude : 87.83735884353518
file name : Image_05092024125045961.png
|
2024-09-05 12:50:46.059833 |
646 |
68205689 |
Creation of drainage channel for management of grey water |
98970 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.406670071184635
Longitude : 87.83739756792784
file name : Image_05092024124954200.png
|
2024-09-05 12:49:54.307232 |
647 |
68205689 |
Creation of drainage channel for management of grey water |
98970 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.407105720601976
Longitude : 87.83752731978893
file name : Image_22082024154706265.png
|
2024-08-22 15:47:06.358441 |
648 |
67415035 |
Construction of roads |
99000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.424154,24.4241555
Longitude : 87.8346484,87.8346495
file name : Image_23082024120443033.png
|
2024-08-23 12:04:43.123753 |
649 |
67415035 |
Construction of roads |
99000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.44807625375688,24.448058903217316
Longitude : 87.82347120344639,87.82346156425774
file name : Image_22082024171627040.png
|
2024-08-22 17:16:27.120737 |
650 |
67415035 |
Construction of roads |
99000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.448073403909802,24.448040714487433
Longitude : 87.82340716570616,87.82336106523871
file name : Image_19082024113832231.png
|
2024-08-19 11:38:32.320309 |
651 |
67607719 |
Construction of roads |
98990 |
Construction of roads1 |
Plinth level |
-
latitude : 24.45212010294199,24.452105560339987
Longitude : 87.83592822030187,87.83591439016163
file name : Image_08092024102633538.png
|
2024-09-08 10:27:55.485049 |
652 |
67607719 |
Construction of roads |
98990 |
Construction of roads1 |
Plinth level |
-
latitude : 24.452131586149335,24.45212869439274
Longitude : 87.83591975457966,87.83589561469853
file name : Image_08092024102548733.png
|
2024-09-08 10:27:10.666742 |
653 |
67607719 |
Construction of roads |
98990 |
Construction of roads1 |
Completion of work |
-
latitude : 24.45181839633733,24.45186705328524
Longitude : 87.83632560633123,87.83632912673056
file name : Image_28082024114742355.png
|
2024-08-28 11:47:43.091118 |
654 |
67406743 |
Construction of roads |
98990 |
Construction of cc roads from shibtala towards dahatala at moloypur |
Plinth level |
-
latitude : 24.44935005158186,24.449374610558152
Longitude : 87.80612871050835,87.80611647292972
file name : Image_22082024115101971.png
|
2024-08-22 11:51:02.068159 |
655 |
67406743 |
Construction of roads |
98990 |
Construction of cc roads from shibtala towards dahatala at moloypur |
Plinth level |
-
latitude : 24.449392883107066,24.449379430152476
Longitude : 87.80614765360951,87.80612368136644
file name : Image_22082024114312115.png
|
2024-08-22 11:43:12.211031 |
656 |
67406743 |
Construction of roads |
98990 |
Construction of cc roads from shibtala towards dahatala at moloypur |
Completion of work |
-
latitude : 24.449383579194546,24.449373437091708
Longitude : 87.80610213987529,87.80612845905125
file name : Image_09082024172609546.png
|
2024-08-09 17:26:09.642649 |