1 |
34515974 |
UPGRADATION OF ROAD PROTECTION GUARDWALL FROM ERABJI TO MOTIN SK PUKUR AT GHUSKIRA |
101302 |
UPGRADATION OF ROAD PROTECTION GUARDWALL FROM ERABJI TO MOTIN SK PUKUR AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.41569833
Longitude : 87.85845219
file name : Image_04032021132807255.png
|
2021-03-04 13:28:07.360812 |
2 |
34515974 |
UPGRADATION OF ROAD PROTECTION GUARDWALL FROM ERABJI TO MOTIN SK PUKUR AT GHUSKIRA |
101302 |
UPGRADATION OF ROAD PROTECTION GUARDWALL FROM ERABJI TO MOTIN SK PUKUR AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.41579007
Longitude : 87.85833935
file name : Image_04032021132744916.png
|
2021-03-04 13:27:45.013351 |
3 |
34515974 |
UPGRADATION OF ROAD PROTECTION GUARDWALL FROM ERABJI TO MOTIN SK PUKUR AT GHUSKIRA |
101302 |
UPGRADATION OF ROAD PROTECTION GUARDWALL FROM ERABJI TO MOTIN SK PUKUR AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.41579007
Longitude : 87.85833935
file name : Image_04032021132814081.png
|
2021-03-04 13:28:14.182257 |
4 |
34515974 |
UPGRADATION OF ROAD PROTECTION GUARDWALL FROM ERABJI TO MOTIN SK PUKUR AT GHUSKIRA |
101302 |
UPGRADATION OF ROAD PROTECTION GUARDWALL FROM ERABJI TO MOTIN SK PUKUR AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.41569833
Longitude : 87.85845219
file name : Image_04032021132735155.png
|
2021-03-04 13:27:35.255321 |
5 |
34515974 |
UPGRADATION OF ROAD PROTECTION GUARDWALL FROM ERABJI TO MOTIN SK PUKUR AT GHUSKIRA |
101302 |
UPGRADATION OF ROAD PROTECTION GUARDWALL FROM ERABJI TO MOTIN SK PUKUR AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41572475
Longitude : 87.85847723
file name : Image_23122020155814976.png
|
2020-12-23 15:58:15.107434 |
6 |
34515195 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO ALIMA BIBI HOUSE AT GHUSKIRA |
100000 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO ALIMA BIBI HOUSE AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.4193248,24.4193248
Longitude : 87.859373,87.859373
file name : Image_08012021115842506.png
|
2021-01-08 11:58:42.730075 |
7 |
34515195 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO ALIMA BIBI HOUSE AT GHUSKIRA |
100000 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO ALIMA BIBI HOUSE AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.4192825,24.41930163
Longitude : 87.85957975,87.85956093
file name : Image_08012021113530805.png
|
2021-01-08 11:35:30.901415 |
8 |
34515195 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO ALIMA BIBI HOUSE AT GHUSKIRA |
100000 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO ALIMA BIBI HOUSE AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.41936583,24.41934463
Longitude : 87.85945075,87.85949927
file name : Image_30122020160320089.png
|
2020-12-30 16:03:20.180109 |
9 |
34515195 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO ALIMA BIBI HOUSE AT GHUSKIRA |
100000 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO ALIMA BIBI HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41928447,24.41924681
Longitude : 87.85961724,87.85970388
file name : Image_17122020170444912.png
|
2020-12-17 17:04:44.99851 |
10 |
34358166 |
UPGRADATION OF PCC ROAD FROM MAIN ROAD TO NABAB SK HOUSE AT DHITORA |
100000 |
UPGRADATION OF PCC ROAD FROM MAIN ROAD TO NABAB SK HOUSE AT DHITORA1 |
Plinth level |
-
latitude : 24.4538651,24.45386507
Longitude : 87.8483582,87.84835804
file name : Image_08012021140852763.png
|
2021-01-08 14:08:52.849228 |
11 |
34358166 |
UPGRADATION OF PCC ROAD FROM MAIN ROAD TO NABAB SK HOUSE AT DHITORA |
100000 |
UPGRADATION OF PCC ROAD FROM MAIN ROAD TO NABAB SK HOUSE AT DHITORA1 |
Plinth level |
-
latitude : 24.45387155,24.45387157
Longitude : 87.84832508,87.84832548
file name : Image_08012021135523192.png
|
2021-01-08 13:55:23.296209 |
12 |
34358166 |
UPGRADATION OF PCC ROAD FROM MAIN ROAD TO NABAB SK HOUSE AT DHITORA |
100000 |
UPGRADATION OF PCC ROAD FROM MAIN ROAD TO NABAB SK HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.45382995,24.45386633
Longitude : 87.84834696,87.84834711
file name : Image_19122020124500567.png
|
2020-12-19 12:45:00.667948 |
13 |
34794577 |
UPGRADATION OF PCC ROAD FROM SITUL SK HOUSE TO SISFUL SK HOUSE AT DADPUR |
70000 |
UPGRADATION OF PCC ROAD FROM SITUL SK HOUSE TO SISFUL SK HOUSE AT DADPUR1 |
Completion of work |
-
latitude : 24.40971355,24.40972076
Longitude : 87.86444348,87.86439214
file name : Image_19012021123428829.png
|
2021-01-19 12:34:28.93037 |
14 |
34794577 |
UPGRADATION OF PCC ROAD FROM SITUL SK HOUSE TO SISFUL SK HOUSE AT DADPUR |
70000 |
UPGRADATION OF PCC ROAD FROM SITUL SK HOUSE TO SISFUL SK HOUSE AT DADPUR1 |
Completion of work |
-
latitude : 24.40970134,24.40970671
Longitude : 87.86440049,87.86440546
file name : Image_19012021123532587.png
|
2021-01-19 12:35:32.688274 |
15 |
34794577 |
UPGRADATION OF PCC ROAD FROM SITUL SK HOUSE TO SISFUL SK HOUSE AT DADPUR |
70000 |
UPGRADATION OF PCC ROAD FROM SITUL SK HOUSE TO SISFUL SK HOUSE AT DADPUR1 |
Completion of work |
-
latitude : 24.40937115,24.40951022
Longitude : 87.86406032,87.8642343
file name : Image_19012021123250293.png
|
2021-01-19 12:32:50.387772 |
16 |
34795120 |
UPGRADATION OF PCC ROAD FROM PCC ROAD TO AKHERUL SK HOUSE VIA REJAUL MONDAL HOUSE AT DADPUR |
100000 |
UPGRADATION OF PCC ROAD FROM PCC ROAD TO AKHERUL SK HOUSE VIA REJAUL MONDAL HOUSE AT DADPUR1 |
Completion of work |
-
latitude : 24.41012032,24.41008885
Longitude : 87.86272689,87.86270062
file name : Image_03032021133750137.png
|
2021-03-03 13:37:50.245494 |
17 |
34795120 |
UPGRADATION OF PCC ROAD FROM PCC ROAD TO AKHERUL SK HOUSE VIA REJAUL MONDAL HOUSE AT DADPUR |
100000 |
UPGRADATION OF PCC ROAD FROM PCC ROAD TO AKHERUL SK HOUSE VIA REJAUL MONDAL HOUSE AT DADPUR1 |
Completion of work |
-
latitude : 24.40966268,24.40968975
Longitude : 87.86321331,87.86323158
file name : Image_03032021133757177.png
|
2021-03-03 13:37:57.285257 |
18 |
34795120 |
UPGRADATION OF PCC ROAD FROM PCC ROAD TO AKHERUL SK HOUSE VIA REJAUL MONDAL HOUSE AT DADPUR |
100000 |
UPGRADATION OF PCC ROAD FROM PCC ROAD TO AKHERUL SK HOUSE VIA REJAUL MONDAL HOUSE AT DADPUR1 |
Completion of work |
-
latitude : 24.40966268,24.40968975
Longitude : 87.86321331,87.86323158
file name : Image_03032021133804800.png
|
2021-03-03 13:38:04.90857 |
19 |
34795120 |
UPGRADATION OF PCC ROAD FROM PCC ROAD TO AKHERUL SK HOUSE VIA REJAUL MONDAL HOUSE AT DADPUR |
100000 |
UPGRADATION OF PCC ROAD FROM PCC ROAD TO AKHERUL SK HOUSE VIA REJAUL MONDAL HOUSE AT DADPUR1 |
Completion of work |
-
latitude : 24.40960056,24.40957775
Longitude : 87.86317372,87.8631596
file name : Image_03032021133800266.png
|
2021-03-03 13:38:00.37667 |
20 |
34795120 |
UPGRADATION OF PCC ROAD FROM PCC ROAD TO AKHERUL SK HOUSE VIA REJAUL MONDAL HOUSE AT DADPUR |
100000 |
UPGRADATION OF PCC ROAD FROM PCC ROAD TO AKHERUL SK HOUSE VIA REJAUL MONDAL HOUSE AT DADPUR1 |
Completion of work |
-
latitude : 24.40960056,24.40957775
Longitude : 87.86317372,87.8631596
file name : Image_03032021133807707.png
|
2021-03-03 13:38:07.817726 |
21 |
39079640 |
CONSTRUCTION OF PCC ROAD FROM SUBHAS KORMOKAR HOUSE TO MENTU KONAI HOUSE AT RAMCH |
91408 |
CONSTRUCTION OF PCC ROAD FROM SUBHAS KORMOKAR HOUSE TO MENTU KONAI HOUSE AT RAMCH1 |
Completion of work |
-
latitude : 24.41921553,24.4192292
Longitude : 87.86022934,87.86024643
file name : Image_08012021121445194.png
|
2021-01-08 12:14:45.305995 |
22 |
39079640 |
CONSTRUCTION OF PCC ROAD FROM SUBHAS KORMOKAR HOUSE TO MENTU KONAI HOUSE AT RAMCH |
91408 |
CONSTRUCTION OF PCC ROAD FROM SUBHAS KORMOKAR HOUSE TO MENTU KONAI HOUSE AT RAMCH1 |
Completion of work |
-
latitude : 24.41923603,24.41926158
Longitude : 87.86022913,87.86024958
file name : Image_08012021120311216.png
|
2021-01-08 12:03:11.325438 |
23 |
39079640 |
CONSTRUCTION OF PCC ROAD FROM SUBHAS KORMOKAR HOUSE TO MENTU KONAI HOUSE AT RAMCH |
91408 |
CONSTRUCTION OF PCC ROAD FROM SUBHAS KORMOKAR HOUSE TO MENTU KONAI HOUSE AT RAMCH1 |
Completion of work |
-
latitude : 24.41921087,24.41925476
Longitude : 87.86024009,87.86025822
file name : Image_08012021114459787.png
|
2021-01-08 11:44:59.898535 |
24 |
39079640 |
CONSTRUCTION OF PCC ROAD FROM SUBHAS KORMOKAR HOUSE TO MENTU KONAI HOUSE AT RAMCH |
91408 |
CONSTRUCTION OF PCC ROAD FROM SUBHAS KORMOKAR HOUSE TO MENTU KONAI HOUSE AT RAMCH1 |
Completion of work |
-
latitude : 24.41921087,24.41925476
Longitude : 87.86024009,87.86025822
file name : Image_08012021114532016.png
|
2021-01-08 11:45:32.128085 |
25 |
39079340 |
CONSTRUCTION OF PUCCA DRAIN (HIGH) FROM RAJU HOUSE TO SUBHASH HOUSE AT BHADISWAR |
200000 |
CONSTRUCTION OF PUCCA DRAIN (HIGH) FROM RAJU HOUSE TO SUBHASH HOUSE AT BHADISWAR1 |
Completion of work |
-
latitude : 24.4388353,24.4388353
Longitude : 87.8591188,87.8591188
file name : Image_24032021122628513.png
|
2021-03-24 12:26:28.60759 |
26 |
39079340 |
CONSTRUCTION OF PUCCA DRAIN (HIGH) FROM RAJU HOUSE TO SUBHASH HOUSE AT BHADISWAR |
200000 |
CONSTRUCTION OF PUCCA DRAIN (HIGH) FROM RAJU HOUSE TO SUBHASH HOUSE AT BHADISWAR1 |
Completion of work |
-
latitude : 24.43842918,24.4386184
Longitude : 87.85917944,87.85924601
file name : Image_24032021122632220.png
|
2021-03-24 12:26:32.326933 |
27 |
39079340 |
CONSTRUCTION OF PUCCA DRAIN (HIGH) FROM RAJU HOUSE TO SUBHASH HOUSE AT BHADISWAR |
200000 |
CONSTRUCTION OF PUCCA DRAIN (HIGH) FROM RAJU HOUSE TO SUBHASH HOUSE AT BHADISWAR1 |
Completion of work |
-
latitude : 24.4388353,24.4195927
Longitude : 87.8591188,87.8377171
file name : Image_24032021122643725.png
|
2021-03-24 12:26:43.820067 |
28 |
39079340 |
CONSTRUCTION OF PUCCA DRAIN (HIGH) FROM RAJU HOUSE TO SUBHASH HOUSE AT BHADISWAR |
200000 |
CONSTRUCTION OF PUCCA DRAIN (HIGH) FROM RAJU HOUSE TO SUBHASH HOUSE AT BHADISWAR1 |
Completion of work |
-
latitude : 24.4384533,24.43845117
Longitude : 87.85915808,87.85919595
file name : Image_02032021141118399.png
|
2021-03-02 14:11:18.478497 |
29 |
39079340 |
CONSTRUCTION OF PUCCA DRAIN (HIGH) FROM RAJU HOUSE TO SUBHASH HOUSE AT BHADISWAR |
200000 |
CONSTRUCTION OF PUCCA DRAIN (HIGH) FROM RAJU HOUSE TO SUBHASH HOUSE AT BHADISWAR1 |
Completion of work |
-
latitude : 24.43841242,24.43843579
Longitude : 87.85918849,87.85920654
file name : Image_02032021141217867.png
|
2021-03-02 14:12:17.968614 |
30 |
47149100 |
CONST OF CONCRETE 2 NOS CALVAERT NEAR PANSU SK HOUSE AND KALITOLA PUKUR AT MOHULLADANGA |
100000 |
CONST OF CONCRETE 2 NOS CALVAERT NEAR PANSU SK HOUSE AND KALITOLA PUKUR AT MOHULLADANGA1 |
Roof laid |
-
latitude : 24.44000886,24.44000877
Longitude : 87.84452505,87.84454175
file name : Image_17022023145618854.png
|
2023-02-17 14:56:18.957709 |
31 |
47149100 |
CONST OF CONCRETE 2 NOS CALVAERT NEAR PANSU SK HOUSE AND KALITOLA PUKUR AT MOHULLADANGA |
100000 |
CONST OF CONCRETE 2 NOS CALVAERT NEAR PANSU SK HOUSE AND KALITOLA PUKUR AT MOHULLADANGA1 |
Plinth level |
-
latitude : 24.44002226,24.44001357
Longitude : 87.84453478,87.84454186
file name : Image_17022023145238446.png
|
2023-02-17 14:52:38.550663 |
32 |
47149100 |
CONST OF CONCRETE 2 NOS CALVAERT NEAR PANSU SK HOUSE AND KALITOLA PUKUR AT MOHULLADANGA |
100000 |
CONST OF CONCRETE 2 NOS CALVAERT NEAR PANSU SK HOUSE AND KALITOLA PUKUR AT MOHULLADANGA1 |
Completion of work |
-
latitude : 24.44002559,24.44001583
Longitude : 87.84458197,87.84456016
file name : Image_17022023144910135.png
|
2023-02-17 14:49:10.236147 |
33 |
47165751 |
CONST ROAD PROTECTION OF WALL BY BOULDER MASONRY FROM MASJID TO MISTER SHOP AT DADPUR |
150000 |
CONST ROAD PROTECTION OF WALL BY BOULDER MASONRY FROM MASJID TO MISTER SHOP AT DADPUR1 |
Completion of work |
-
latitude : 24.409778333333332
Longitude : 87.86288333333331
file name : Image_08072022112229537.png
|
2022-07-08 11:22:29.64632 |
34 |
47165751 |
CONST ROAD PROTECTION OF WALL BY BOULDER MASONRY FROM MASJID TO MISTER SHOP AT DADPUR |
150000 |
CONST ROAD PROTECTION OF WALL BY BOULDER MASONRY FROM MASJID TO MISTER SHOP AT DADPUR1 |
Completion of work |
-
latitude : 24.40957
Longitude : 87.86295999999999
file name : Image_29062022142115007.png
|
2022-06-29 14:21:15.097968 |
35 |
47165751 |
CONST ROAD PROTECTION OF WALL BY BOULDER MASONRY FROM MASJID TO MISTER SHOP AT DADPUR |
150000 |
CONST ROAD PROTECTION OF WALL BY BOULDER MASONRY FROM MASJID TO MISTER SHOP AT DADPUR1 |
Completion of work |
-
latitude : 24.409663333333334
Longitude : 87.86296166666668
file name : Image_08072022112232550.png
|
2022-07-08 11:22:32.638056 |
36 |
47165751 |
CONST ROAD PROTECTION OF WALL BY BOULDER MASONRY FROM MASJID TO MISTER SHOP AT DADPUR |
150000 |
CONST ROAD PROTECTION OF WALL BY BOULDER MASONRY FROM MASJID TO MISTER SHOP AT DADPUR1 |
Completion of work |
-
latitude : 24.409663333333334
Longitude : 87.86296166666668
file name : Image_08072022112236878.png
|
2022-07-08 11:22:36.990591 |
37 |
47164881 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA |
99000 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.418155000000002,24.418006666666663
Longitude : 87.85647833333333,87.85667
file name : Image_25082022114138432.png
|
2022-08-25 11:41:38.538925 |
38 |
47164881 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA |
99000 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.418121666666668,24.418095
Longitude : 87.85646999999999,87.85655166666666
file name : Image_25082022114132725.png
|
2022-08-25 11:41:32.848352 |
39 |
47164881 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA |
99000 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.417994999999998,24.418135
Longitude : 87.85668833333332,87.85644333333333
file name : Image_25082022114135600.png
|
2022-08-25 11:41:35.712279 |
40 |
47164881 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA |
99000 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.418121666666668,24.418095
Longitude : 87.85646999999999,87.85655166666666
file name : Image_25082022114141408.png
|
2022-08-25 11:41:41.560649 |
41 |
47164881 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA |
99000 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.417994999999998,24.418135
Longitude : 87.85668833333332,87.85644333333333
file name : Image_25082022114144297.png
|
2022-08-25 11:41:44.404364 |
42 |
47164881 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA |
99000 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.418155000000002,24.418006666666663
Longitude : 87.85647833333333,87.85667
file name : Image_25082022114147238.png
|
2022-08-25 11:41:47.348645 |
43 |
47164881 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA |
99000 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.418146666666665,24.418165
Longitude : 87.85648333333332,87.85644166666667
file name : Image_02092022112720034.png
|
2022-09-02 11:27:20.143197 |
44 |
47164881 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA |
99000 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.418156666666665,24.418116666666666
Longitude : 87.85640333333335,87.85644166666667
file name : Image_02092022112901116.png
|
2022-09-02 11:29:01.23013 |
45 |
47164881 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA |
99000 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.418099999999995,24.418021666666665
Longitude : 87.85654000000001,87.85663833333335
file name : Image_02092022112929285.png
|
2022-09-02 11:29:29.411409 |
46 |
47164881 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA |
99000 |
CONST OF CONCRETE ROAD FROM BULU SK HOUSE TO PCC ROAD AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.418099999999995,24.418021666666665
Longitude : 87.85654000000001,87.85663833333335
file name : Image_02092022112952407.png
|
2022-09-02 11:29:52.541336 |
47 |
47148493 |
CONST OF CONCRETE ROAD FROM LIAKOT SK TO JARINA KHATUN HOUSE AT DHITORA |
150000 |
CONST OF CONCRETE ROAD FROM LIAKOT SK TO JARINA KHATUN HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.4401633,24.4401633
Longitude : 87.8563147,87.8563147
file name : Image_26082022145246951.png
|
2022-08-26 14:52:47.063869 |
48 |
47148493 |
CONST OF CONCRETE ROAD FROM LIAKOT SK TO JARINA KHATUN HOUSE AT DHITORA |
150000 |
CONST OF CONCRETE ROAD FROM LIAKOT SK TO JARINA KHATUN HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.4401633,24.4401633
Longitude : 87.8563147,87.8563147
file name : Image_26082022164628363.png
|
2022-08-26 16:46:28.473932 |
49 |
47148493 |
CONST OF CONCRETE ROAD FROM LIAKOT SK TO JARINA KHATUN HOUSE AT DHITORA |
150000 |
CONST OF CONCRETE ROAD FROM LIAKOT SK TO JARINA KHATUN HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.4401633,24.4401633
Longitude : 87.8563147,87.8563147
file name : Image_26082022164621045.png
|
2022-08-26 16:46:21.161207 |
50 |
47166102 |
CONST OF CONCRETE ROAD FROM MANNAN MONDAL TO TAJU SK HOUSE AT DADPUR |
150000 |
CONST OF CONCRETE ROAD FROM MANNAN MONDAL TO TAJU SK HOUSE AT DADPUR1 |
Completion of work |
-
latitude : 24.412395,24.4123963
Longitude : 87.8586293,87.85863
file name : Image_31082022163745065.png
|
2022-08-31 16:37:45.159667 |
51 |
47166102 |
CONST OF CONCRETE ROAD FROM MANNAN MONDAL TO TAJU SK HOUSE AT DADPUR |
150000 |
CONST OF CONCRETE ROAD FROM MANNAN MONDAL TO TAJU SK HOUSE AT DADPUR1 |
Completion of work |
-
latitude : 24.412395,24.4123963
Longitude : 87.8586293,87.85863
file name : Image_31082022163809438.png
|
2022-08-31 16:38:09.535875 |
52 |
47166102 |
CONST OF CONCRETE ROAD FROM MANNAN MONDAL TO TAJU SK HOUSE AT DADPUR |
150000 |
CONST OF CONCRETE ROAD FROM MANNAN MONDAL TO TAJU SK HOUSE AT DADPUR1 |
Completion of work |
-
latitude : 24.4123941,24.4123941
Longitude : 87.858622,87.858622
file name : Image_31082022163750867.png
|
2022-08-31 16:37:50.96837 |
53 |
47166102 |
CONST OF CONCRETE ROAD FROM MANNAN MONDAL TO TAJU SK HOUSE AT DADPUR |
150000 |
CONST OF CONCRETE ROAD FROM MANNAN MONDAL TO TAJU SK HOUSE AT DADPUR1 |
Completion of work |
-
latitude : 24.4123963,24.4123963
Longitude : 87.85863,87.85863
file name : Image_31082022163747985.png
|
2022-08-31 16:37:48.090964 |
54 |
47147347 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SHIBRAM MONDAL TO PRONAB SAHU HOUSE AT GHUSKIRA |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SHIBRAM MONDAL TO PRONAB SAHU HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.418833333333335,24.419103333333336
Longitude : 87.85613166666666,87.856105
file name : Image_12092022152312487.png
|
2022-09-12 15:23:12.625402 |
55 |
47147347 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SHIBRAM MONDAL TO PRONAB SAHU HOUSE AT GHUSKIRA |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SHIBRAM MONDAL TO PRONAB SAHU HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41885,24.419115
Longitude : 87.85601999999999,87.85610833333334
file name : Image_12092022152322372.png
|
2022-09-12 15:23:22.538556 |
56 |
47147347 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SHIBRAM MONDAL TO PRONAB SAHU HOUSE AT GHUSKIRA |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SHIBRAM MONDAL TO PRONAB SAHU HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41885,24.419115
Longitude : 87.85601999999999,87.85610833333334
file name : Image_12092022152333059.png
|
2022-09-12 15:23:33.223061 |
57 |
47147347 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SHIBRAM MONDAL TO PRONAB SAHU HOUSE AT GHUSKIRA |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SHIBRAM MONDAL TO PRONAB SAHU HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41917,24.419011666666666
Longitude : 87.85614333333334,87.85609500000001
file name : Image_12092022152317316.png
|
2022-09-12 15:23:17.408999 |
58 |
47147347 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SHIBRAM MONDAL TO PRONAB SAHU HOUSE AT GHUSKIRA |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SHIBRAM MONDAL TO PRONAB SAHU HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41917,24.419011666666666
Longitude : 87.85614333333334,87.85609500000001
file name : Image_12092022152327931.png
|
2022-09-12 15:23:28.02228 |
59 |
47147347 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SHIBRAM MONDAL TO PRONAB SAHU HOUSE AT GHUSKIRA |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SHIBRAM MONDAL TO PRONAB SAHU HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.4402418,24.4402418
Longitude : 87.8563398,87.8563398
file name : Image_24082022134219338.png
|
2022-08-24 13:42:19.447435 |
60 |
56748930 |
MAINTANENCE OF STREET LIGHT VARIOUS LOCATION UNDER MURARAI GP |
100000 |
MAINTANENCE OF STREET LIGHT VARIOUS LOCATION UNDER MURARAI GP1 |
Roof laid |
-
latitude : 24.4402749
Longitude : 87.8563206
file name : Image_05082023125719154.png
|
2023-08-05 12:57:19.291186 |
61 |
56748930 |
MAINTANENCE OF STREET LIGHT VARIOUS LOCATION UNDER MURARAI GP |
100000 |
MAINTANENCE OF STREET LIGHT VARIOUS LOCATION UNDER MURARAI GP1 |
Plinth level |
-
latitude : 24.4402739
Longitude : 87.856314
file name : Image_05082023124844911.png
|
2023-08-05 12:48:45.054913 |
62 |
56748930 |
MAINTANENCE OF STREET LIGHT VARIOUS LOCATION UNDER MURARAI GP |
100000 |
MAINTANENCE OF STREET LIGHT VARIOUS LOCATION UNDER MURARAI GP1 |
Completion of work |
-
latitude : 24.4402791
Longitude : 87.856308
file name : Image_05082023124414971.png
|
2023-08-05 12:44:15.108207 |
63 |
34465048 |
UPGRADATION OF PCC ROAD FROM MASJID TO ASRAF SK HOUSE AT LD PARA |
130000 |
UPGRADATION OF PCC ROAD FROM MASJID TO ASRAF SK HOUSE AT LD PARA1 |
Completion of work |
-
latitude : 24.4461257,24.4461257
Longitude : 87.8539162,87.8539162
file name : Image_25012021155321225.png
|
2021-01-25 15:53:21.344521 |
64 |
34465048 |
UPGRADATION OF PCC ROAD FROM MASJID TO ASRAF SK HOUSE AT LD PARA |
130000 |
UPGRADATION OF PCC ROAD FROM MASJID TO ASRAF SK HOUSE AT LD PARA1 |
Completion of work |
-
latitude : 24.4463272,24.4463272
Longitude : 87.8538009,87.8538009
file name : Image_25012021155405597.png
|
2021-01-25 15:54:05.7101 |
65 |
34465048 |
UPGRADATION OF PCC ROAD FROM MASJID TO ASRAF SK HOUSE AT LD PARA |
130000 |
UPGRADATION OF PCC ROAD FROM MASJID TO ASRAF SK HOUSE AT LD PARA1 |
Completion of work |
-
latitude : 24.4460352,24.4460352
Longitude : 87.8540067,87.8540067
file name : Image_25012021155443658.png
|
2021-01-25 15:54:43.781702 |
66 |
39078306 |
RENOVATION OF PCC ROAD FROM JAGGANTH DUTTA TO BAKKAR SK HOUSE AT MURARAI HAZRADIGHI |
120000 |
RENOVATION OF PCC ROAD FROM JAGGANTH DUTTA TO BAKKAR SK HOUSE AT MURARAI HAZRADIGHI1 |
Completion of work |
-
latitude : 24.4391404,24.4391404
Longitude : 87.8559299,87.8559299
file name : Image_27012021135127102.png
|
2021-01-27 13:51:27.218926 |
67 |
39078306 |
RENOVATION OF PCC ROAD FROM JAGGANTH DUTTA TO BAKKAR SK HOUSE AT MURARAI HAZRADIGHI |
120000 |
RENOVATION OF PCC ROAD FROM JAGGANTH DUTTA TO BAKKAR SK HOUSE AT MURARAI HAZRADIGHI1 |
Completion of work |
-
latitude : 24.4390652,24.43847976
Longitude : 87.8548508,87.85552473
file name : Image_27012021135232393.png
|
2021-01-27 13:52:32.510067 |
68 |
39078306 |
RENOVATION OF PCC ROAD FROM JAGGANTH DUTTA TO BAKKAR SK HOUSE AT MURARAI HAZRADIGHI |
120000 |
RENOVATION OF PCC ROAD FROM JAGGANTH DUTTA TO BAKKAR SK HOUSE AT MURARAI HAZRADIGHI1 |
Completion of work |
-
latitude : 24.43852148,24.439341
Longitude : 87.85564513,87.8550858
file name : Image_27012021135316064.png
|
2021-01-27 13:53:16.175218 |
69 |
34462837 |
UPGRADATION OF PCC ROAD FROM MASJID TO SELIM SK HOUSE AND BAITUL SK HOUSE TO SITU SARKAR |
100000 |
UPGRADATION OF PCC ROAD FROM MASJID TO SELIM SK HOUSE AND BAITUL SK HOUSE TO SITU SARKAR1 |
Plinth level |
-
latitude : 24.4455249,24.4455249
Longitude : 87.8540067,87.8540067
file name : Image_08012021134119631.png
|
2021-01-08 13:41:19.727729 |
70 |
34462837 |
UPGRADATION OF PCC ROAD FROM MASJID TO SELIM SK HOUSE AND BAITUL SK HOUSE TO SITU SARKAR |
100000 |
UPGRADATION OF PCC ROAD FROM MASJID TO SELIM SK HOUSE AND BAITUL SK HOUSE TO SITU SARKAR1 |
Plinth level |
-
latitude : 24.4455249,24.4455249
Longitude : 87.8540067,87.8540067
file name : Image_08012021133304298.png
|
2021-01-08 13:33:04.41216 |
71 |
34462837 |
UPGRADATION OF PCC ROAD FROM MASJID TO SELIM SK HOUSE AND BAITUL SK HOUSE TO SITU SARKAR |
100000 |
UPGRADATION OF PCC ROAD FROM MASJID TO SELIM SK HOUSE AND BAITUL SK HOUSE TO SITU SARKAR1 |
Completion of work |
-
latitude : 24.44905739,24.44904273
Longitude : 87.85508281,87.85510824
file name : Image_19122020131228524.png
|
2020-12-19 13:12:28.612124 |
72 |
34466042 |
UPGRADATION OF PCC ROAD FROM MURTOJA HOUSE TO NIYAMOT SK HOUSE AT MURARAI |
95000 |
UPGRADATION OF PCC ROAD FROM MURTOJA HOUSE TO NIYAMOT SK HOUSE AT MURARAI1 |
Plinth level |
-
latitude : 24.4443941,24.4443941
Longitude : 87.852779,87.852779
file name : Image_08012021133942733.png
|
2021-01-08 13:39:42.849126 |
73 |
34466042 |
UPGRADATION OF PCC ROAD FROM MURTOJA HOUSE TO NIYAMOT SK HOUSE AT MURARAI |
95000 |
UPGRADATION OF PCC ROAD FROM MURTOJA HOUSE TO NIYAMOT SK HOUSE AT MURARAI1 |
Plinth level |
-
latitude : 24.4455249,24.4455249
Longitude : 87.8540067,87.8540067
file name : Image_08012021133048155.png
|
2021-01-08 13:30:48.291689 |
74 |
34466042 |
UPGRADATION OF PCC ROAD FROM MURTOJA HOUSE TO NIYAMOT SK HOUSE AT MURARAI |
95000 |
UPGRADATION OF PCC ROAD FROM MURTOJA HOUSE TO NIYAMOT SK HOUSE AT MURARAI1 |
Completion of work |
-
latitude : 24.44909318,24.44909647
Longitude : 87.85492056,87.85483836
file name : Image_19122020131353961.png
|
2020-12-19 13:13:54.039375 |
75 |
34474537 |
UPGRADATION OF PUCCA DRAIN WITH RCC COVER SLUB FROM MURARAI JUMMA MASJID TO NOKIR SK HOUSE AT MUR |
175116 |
UPGRADATION OF PUCCA DRAIN WITH RCC COVER SLUB FROM MURARAI JUMMA MASJID TO NOKIR SK HOUSE AT MUR1 |
Completion of work |
-
latitude : 24.44273676,24.44279718
Longitude : 87.85186247,87.85185465
file name : Image_23032021121448900.png
|
2021-03-23 12:14:49.154713 |
76 |
34474537 |
UPGRADATION OF PUCCA DRAIN WITH RCC COVER SLUB FROM MURARAI JUMMA MASJID TO NOKIR SK HOUSE AT MUR |
175116 |
UPGRADATION OF PUCCA DRAIN WITH RCC COVER SLUB FROM MURARAI JUMMA MASJID TO NOKIR SK HOUSE AT MUR1 |
Completion of work |
-
latitude : 24.44282642,24.44292761
Longitude : 87.85179415,87.85156872
file name : Image_23032021121452923.png
|
2021-03-23 12:14:53.012557 |
77 |
34474537 |
UPGRADATION OF PUCCA DRAIN WITH RCC COVER SLUB FROM MURARAI JUMMA MASJID TO NOKIR SK HOUSE AT MUR |
175116 |
UPGRADATION OF PUCCA DRAIN WITH RCC COVER SLUB FROM MURARAI JUMMA MASJID TO NOKIR SK HOUSE AT MUR1 |
Completion of work |
-
latitude : 24.44273676,24.44279718
Longitude : 87.85186247,87.85185465
file name : Image_23032021121501634.png
|
2021-03-23 12:15:01.721555 |
78 |
34474537 |
UPGRADATION OF PUCCA DRAIN WITH RCC COVER SLUB FROM MURARAI JUMMA MASJID TO NOKIR SK HOUSE AT MUR |
175116 |
UPGRADATION OF PUCCA DRAIN WITH RCC COVER SLUB FROM MURARAI JUMMA MASJID TO NOKIR SK HOUSE AT MUR1 |
Completion of work |
-
latitude : 24.44282642,24.44292761
Longitude : 87.85179415,87.85156872
file name : Image_23032021121510381.png
|
2021-03-23 12:15:10.469443 |
79 |
34474537 |
UPGRADATION OF PUCCA DRAIN WITH RCC COVER SLUB FROM MURARAI JUMMA MASJID TO NOKIR SK HOUSE AT MUR |
175116 |
UPGRADATION OF PUCCA DRAIN WITH RCC COVER SLUB FROM MURARAI JUMMA MASJID TO NOKIR SK HOUSE AT MUR1 |
Completion of work |
-
latitude : 24.44280403,24.44282089
Longitude : 87.85188054,87.8518552
file name : Image_24022021121458317.png
|
2021-02-24 12:14:58.405295 |
80 |
34474537 |
UPGRADATION OF PUCCA DRAIN WITH RCC COVER SLUB FROM MURARAI JUMMA MASJID TO NOKIR SK HOUSE AT MUR |
175116 |
UPGRADATION OF PUCCA DRAIN WITH RCC COVER SLUB FROM MURARAI JUMMA MASJID TO NOKIR SK HOUSE AT MUR1 |
Completion of work |
-
latitude : 24.4428399,24.44284038
Longitude : 87.85180339,87.85180376
file name : Image_24022021121616650.png
|
2021-02-24 12:16:16.743071 |
81 |
47147161 |
CONST OF CONCRETE BOTH SIDE PUCCA DRAIN WITH COVER SLAB FROM IMAM SK TO TAKBIR SK VIA MONIR SK HOUSE |
150000 |
CONST OF CONCRETE BOTH SIDE PUCCA DRAIN WITH COVER SLAB FROM IMAM SK TO TAKBIR SK VIA MONIR SK HOUSE1 |
Plinth level |
-
latitude : 24.44053,24.440546666666666
Longitude : 87.84282,87.84280500000001
file name : Image_01112022140130609.png
|
2022-11-01 14:01:30.698034 |
82 |
47147161 |
CONST OF CONCRETE BOTH SIDE PUCCA DRAIN WITH COVER SLAB FROM IMAM SK TO TAKBIR SK VIA MONIR SK HOUSE |
150000 |
CONST OF CONCRETE BOTH SIDE PUCCA DRAIN WITH COVER SLAB FROM IMAM SK TO TAKBIR SK VIA MONIR SK HOUSE1 |
Roof laid |
-
latitude : 24.4402517,24.4402517,24.4402517
Longitude : 87.8563527,87.8563527,87.8563527
file name : Image_01112022142420726.png
|
2022-11-01 14:24:20.86362 |
83 |
47147161 |
CONST OF CONCRETE BOTH SIDE PUCCA DRAIN WITH COVER SLAB FROM IMAM SK TO TAKBIR SK VIA MONIR SK HOUSE |
150000 |
CONST OF CONCRETE BOTH SIDE PUCCA DRAIN WITH COVER SLAB FROM IMAM SK TO TAKBIR SK VIA MONIR SK HOUSE1 |
Completion of work |
-
latitude : 24.440255,24.440255
Longitude : 87.8563426,87.8563426
file name : Image_17102022133033709.png
|
2022-10-17 13:30:33.851071 |
84 |
39077730 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER SLAB FROM NURE ALAM TO MITHU HOUSE AT MURARAI |
200000 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER SLAB FROM NURE ALAM TO MITHU HOUSE AT MURARAI1 |
Plinth level |
-
latitude : 24.4443939,24.4443939
Longitude : 87.8527598,87.8527598
file name : Image_28012021153044905.png
|
2021-01-28 15:30:45.015598 |
85 |
39077730 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER SLAB FROM NURE ALAM TO MITHU HOUSE AT MURARAI |
200000 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER SLAB FROM NURE ALAM TO MITHU HOUSE AT MURARAI1 |
Plinth level |
-
latitude : 24.4443939,24.4455014
Longitude : 87.8527598,87.8539875
file name : Image_28012021153201916.png
|
2021-01-28 15:32:02.014352 |
86 |
39077730 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER SLAB FROM NURE ALAM TO MITHU HOUSE AT MURARAI |
200000 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER SLAB FROM NURE ALAM TO MITHU HOUSE AT MURARAI1 |
Plinth level |
-
latitude : 24.4455014,24.4452798
Longitude : 87.8539875,87.8539416
file name : Image_28012021153257653.png
|
2021-01-28 15:32:57.748386 |
87 |
39077730 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER SLAB FROM NURE ALAM TO MITHU HOUSE AT MURARAI |
200000 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER SLAB FROM NURE ALAM TO MITHU HOUSE AT MURARAI1 |
Completion of work |
-
latitude : 24.44426126,24.4442661
Longitude : 87.85273339,87.85275123
file name : Image_08012021134556973.png
|
2021-01-08 13:45:57.08702 |
88 |
34362543 |
UPGRADATION OF PUCCA DRAIN FROM RONGOLE HOUSE TO AKBAR MOLLA HOUSE AT PANIARA |
80337 |
UPGRADATION OF PUCCA DRAIN FROM RONGOLE HOUSE TO AKBAR MOLLA HOUSE AT PANIARA1 |
Completion of work |
-
latitude : 24.41927553,24.4187382
Longitude : 87.8569622,87.8572534
file name : Image_08012021123946064.png
|
2021-01-08 12:39:46.167709 |
89 |
34362543 |
UPGRADATION OF PUCCA DRAIN FROM RONGOLE HOUSE TO AKBAR MOLLA HOUSE AT PANIARA |
80337 |
UPGRADATION OF PUCCA DRAIN FROM RONGOLE HOUSE TO AKBAR MOLLA HOUSE AT PANIARA1 |
Completion of work |
-
latitude : 24.4192592,24.4192505
Longitude : 87.85700324,87.85702083
file name : Image_08012021123750991.png
|
2021-01-08 12:37:51.097004 |
90 |
34362543 |
UPGRADATION OF PUCCA DRAIN FROM RONGOLE HOUSE TO AKBAR MOLLA HOUSE AT PANIARA |
80337 |
UPGRADATION OF PUCCA DRAIN FROM RONGOLE HOUSE TO AKBAR MOLLA HOUSE AT PANIARA1 |
Completion of work |
-
latitude : 24.41929912,24.41930444
Longitude : 87.85698491,87.85699993
file name : Image_08012021123411547.png
|
2021-01-08 12:34:11.659024 |
91 |
39075539 |
CONSTRUCTION OF RCC COVER SLAB ON EXISTING PUCCA DRAIN FROM SAMORENDRA HOUSE TO KARTIK HOUSE VIA |
150000 |
CONSTRUCTION OF RCC COVER SLAB ON EXISTING PUCCA DRAIN FROM SAMORENDRA HOUSE TO KARTIK HOUSE VIA1 |
Completion of work |
-
latitude : 24.45955231,24.45956761
Longitude : 87.85743748,87.85741256
file name : Image_13022021103717796.png
|
2021-02-13 10:37:17.898327 |
92 |
39075539 |
CONSTRUCTION OF RCC COVER SLAB ON EXISTING PUCCA DRAIN FROM SAMORENDRA HOUSE TO KARTIK HOUSE VIA |
150000 |
CONSTRUCTION OF RCC COVER SLAB ON EXISTING PUCCA DRAIN FROM SAMORENDRA HOUSE TO KARTIK HOUSE VIA1 |
Completion of work |
-
latitude : 24.45949776,24.45951068
Longitude : 87.8575595,87.85755043
file name : Image_13022021103614235.png
|
2021-02-13 10:36:14.326277 |
93 |
39075539 |
CONSTRUCTION OF RCC COVER SLAB ON EXISTING PUCCA DRAIN FROM SAMORENDRA HOUSE TO KARTIK HOUSE VIA |
150000 |
CONSTRUCTION OF RCC COVER SLAB ON EXISTING PUCCA DRAIN FROM SAMORENDRA HOUSE TO KARTIK HOUSE VIA1 |
Completion of work |
-
latitude : 24.45955174,24.45958293
Longitude : 87.85735909,87.85735199
file name : Image_13022021103806527.png
|
2021-02-13 10:38:06.639089 |
94 |
39075486 |
CONSTRUCTION OF PUCCA DRAIN FROM TULTUL HOUSE TO ZIARUL LAND AT MIAPUR |
111416 |
CONSTRUCTION OF PUCCA DRAIN FROM TULTUL HOUSE TO ZIARUL LAND AT MIAPUR1 |
Completion of work |
-
latitude : 24.45882536,24.45885911
Longitude : 87.84801821,87.8480109
file name : Image_24022021141610823.png
|
2021-02-24 14:16:10.898973 |
95 |
39075486 |
CONSTRUCTION OF PUCCA DRAIN FROM TULTUL HOUSE TO ZIARUL LAND AT MIAPUR |
111416 |
CONSTRUCTION OF PUCCA DRAIN FROM TULTUL HOUSE TO ZIARUL LAND AT MIAPUR1 |
Completion of work |
-
latitude : 24.45891998,24.45884721
Longitude : 87.8479668,87.8480167
file name : Image_24022021141714890.png
|
2021-02-24 14:17:14.968593 |
96 |
39075486 |
CONSTRUCTION OF PUCCA DRAIN FROM TULTUL HOUSE TO ZIARUL LAND AT MIAPUR |
111416 |
CONSTRUCTION OF PUCCA DRAIN FROM TULTUL HOUSE TO ZIARUL LAND AT MIAPUR1 |
Completion of work |
-
latitude : 24.44012408,24.45884133
Longitude : 87.85630292,87.84802474
file name : Image_24022021141455871.png
|
2021-02-24 14:14:55.954489 |
97 |
34342655 |
UPGRADATION OF PCC ROAD FROM HABIBULLAH TO RITON SK HOUSE AND MUNCHEHER TO KAIJAR SK HOUSE AT MIAPUR |
110000 |
UPGRADATION OF PCC ROAD FROM HABIBULLAH TO RITON SK HOUSE AND MUNCHEHER TO KAIJAR SK HOUSE AT MIAPUR |
Plinth level |
-
latitude : 24.45387175,24.45387187
Longitude : 87.84832559,87.84832573
file name : Image_08012021135527388.png
|
2021-01-08 13:55:27.487119 |
98 |
34342655 |
UPGRADATION OF PCC ROAD FROM HABIBULLAH TO RITON SK HOUSE AND MUNCHEHER TO KAIJAR SK HOUSE AT MIAPUR |
110000 |
UPGRADATION OF PCC ROAD FROM HABIBULLAH TO RITON SK HOUSE AND MUNCHEHER TO KAIJAR SK HOUSE AT MIAPUR |
Plinth level |
-
latitude : 24.45387175,24.45387187
Longitude : 87.84832559,87.84832573
file name : Image_08012021135531428.png
|
2021-01-08 13:55:31.525894 |
99 |
34342655 |
UPGRADATION OF PCC ROAD FROM HABIBULLAH TO RITON SK HOUSE AND MUNCHEHER TO KAIJAR SK HOUSE AT MIAPUR |
110000 |
UPGRADATION OF PCC ROAD FROM HABIBULLAH TO RITON SK HOUSE AND MUNCHEHER TO KAIJAR SK HOUSE AT MIAPUR |
Completion of work |
-
latitude : 24.45385256,24.45387791
Longitude : 87.84831383,87.84834925
file name : Image_19122020124604084.png
|
2020-12-19 12:46:04.180246 |
100 |
34515016 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO KALAM SK HOUSE AT GHUSKIRA |
100000 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO KALAM SK HOUSE AT GHUSKIRA |
Plinth level |
-
latitude : 24.4193248,24.4193248
Longitude : 87.859373,87.859373
file name : Image_08012021120012891.png
|
2021-01-08 12:00:13.026112 |
101 |
34515016 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO KALAM SK HOUSE AT GHUSKIRA |
100000 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO KALAM SK HOUSE AT GHUSKIRA |
Plinth level |
-
latitude : 24.41931454,24.41938404
Longitude : 87.85941373,87.8593907
file name : Image_08012021114509103.png
|
2021-01-08 11:45:09.222679 |
102 |
34515016 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO KALAM SK HOUSE AT GHUSKIRA |
100000 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO KALAM SK HOUSE AT GHUSKIRA |
Plinth level |
-
latitude : 24.41927779,24.41929325
Longitude : 87.86027388,87.86029378
file name : Image_30122020160400932.png
|
2020-12-30 16:04:01.035554 |
103 |
34515016 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO KALAM SK HOUSE AT GHUSKIRA |
100000 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO KALAM SK HOUSE AT GHUSKIRA |
Completion of work |
-
latitude : 24.41920164,24.41931025
Longitude : 87.86019904,87.85986
file name : Image_17122020170638493.png
|
2020-12-17 17:06:38.587251 |
104 |
34484642 |
UPGRADATION OF PCC ROAD FROM MRITYUNJOY HOUSE TO SUNITA LAND AT BHADISWAR |
120000 |
UPGRADATION OF PCC ROAD FROM MRITYUNJOY HOUSE TO SUNITA LAND AT BHADISWAR1 |
Plinth level |
-
latitude : 24.4541639,24.4541639
Longitude : 87.8481746,87.8481746
file name : Image_08012021141142844.png
|
2021-01-08 14:11:42.920207 |
105 |
34484642 |
UPGRADATION OF PCC ROAD FROM MRITYUNJOY HOUSE TO SUNITA LAND AT BHADISWAR |
120000 |
UPGRADATION OF PCC ROAD FROM MRITYUNJOY HOUSE TO SUNITA LAND AT BHADISWAR1 |
Plinth level |
-
latitude : 24.45368058,24.45371748
Longitude : 87.84825108,87.84826668
file name : Image_08012021140004677.png
|
2021-01-08 14:00:04.789344 |
106 |
34484642 |
UPGRADATION OF PCC ROAD FROM MRITYUNJOY HOUSE TO SUNITA LAND AT BHADISWAR |
120000 |
UPGRADATION OF PCC ROAD FROM MRITYUNJOY HOUSE TO SUNITA LAND AT BHADISWAR1 |
Plinth level |
-
latitude : 24.44246228,24.44260376
Longitude : 87.86462904,87.86463511
file name : Image_29122020124721918.png
|
2020-12-29 12:47:22.02216 |
107 |
34484642 |
UPGRADATION OF PCC ROAD FROM MRITYUNJOY HOUSE TO SUNITA LAND AT BHADISWAR |
120000 |
UPGRADATION OF PCC ROAD FROM MRITYUNJOY HOUSE TO SUNITA LAND AT BHADISWAR1 |
Completion of work |
-
latitude : 24.44241061,24.44255978
Longitude : 87.86472576,87.86473133
file name : Image_18122020161115332.png
|
2020-12-18 16:11:15.42994 |
108 |
47164179 |
CONST OF CONCRETE ROAD FROM FUL KUMAR MONDAL TO JODU HOUSE AT GHUSKIRA |
120000 |
CONST OF CONCRETE ROAD FROM FUL KUMAR MONDAL TO JODU HOUSE AT GHUSKIRA 1 |
Completion of work |
-
latitude : 24.415486666666666,24.415568333333333
Longitude : 87.85693833333335,87.85704499999999
file name : Image_13092022161041757.png
|
2022-09-13 16:10:41.84835 |
109 |
47164179 |
CONST OF CONCRETE ROAD FROM FUL KUMAR MONDAL TO JODU HOUSE AT GHUSKIRA |
120000 |
CONST OF CONCRETE ROAD FROM FUL KUMAR MONDAL TO JODU HOUSE AT GHUSKIRA 1 |
Completion of work |
-
latitude : 24.415486666666666,24.415568333333333
Longitude : 87.85693833333335,87.85704499999999
file name : Image_13092022161048540.png
|
2022-09-13 16:10:48.644748 |
110 |
47164179 |
CONST OF CONCRETE ROAD FROM FUL KUMAR MONDAL TO JODU HOUSE AT GHUSKIRA |
120000 |
CONST OF CONCRETE ROAD FROM FUL KUMAR MONDAL TO JODU HOUSE AT GHUSKIRA 1 |
Completion of work |
-
latitude : 24.4156,24.41560666666667
Longitude : 87.85722166666667,87.85712
file name : Image_13092022161045362.png
|
2022-09-13 16:10:45.448825 |
111 |
47164179 |
CONST OF CONCRETE ROAD FROM FUL KUMAR MONDAL TO JODU HOUSE AT GHUSKIRA |
120000 |
CONST OF CONCRETE ROAD FROM FUL KUMAR MONDAL TO JODU HOUSE AT GHUSKIRA 1 |
Completion of work |
-
latitude : 24.4156,24.41560666666667
Longitude : 87.85722166666667,87.85712
file name : Image_13092022161037999.png
|
2022-09-13 16:10:38.084599 |
112 |
47164179 |
CONST OF CONCRETE ROAD FROM FUL KUMAR MONDAL TO JODU HOUSE AT GHUSKIRA |
120000 |
CONST OF CONCRETE ROAD FROM FUL KUMAR MONDAL TO JODU HOUSE AT GHUSKIRA 1 |
Completion of work |
-
latitude : 24.415540000000004,24.41556166666667
Longitude : 87.857575,87.85738
file name : Image_13092022161033818.png
|
2022-09-13 16:10:33.910837 |
113 |
39079010 |
CONSTRUCTION OF PCC ROAD FROM MIHIR MONDAL HOUSE TO BOTTH GHOSH HOUSE AT BHADISWAR |
100000 |
CONSTRUCTION OF PCC ROAD FROM MIHIR MONDAL HOUSE TO BOTTH GHOSH HOUSE AT BHADISWAR |
Plinth level |
-
latitude : 24.44274581,24.4411096
Longitude : 87.86060721,87.8624945
file name : Image_08012021152428625.png
|
2021-01-08 15:24:28.718082 |
114 |
39079010 |
CONSTRUCTION OF PCC ROAD FROM MIHIR MONDAL HOUSE TO BOTTH GHOSH HOUSE AT BHADISWAR |
100000 |
CONSTRUCTION OF PCC ROAD FROM MIHIR MONDAL HOUSE TO BOTTH GHOSH HOUSE AT BHADISWAR |
Plinth level |
-
latitude : 24.44278203,24.44276221
Longitude : 87.86061391,87.86060919
file name : Image_08012021151225326.png
|
2021-01-08 15:12:25.417178 |
115 |
39079010 |
CONSTRUCTION OF PCC ROAD FROM MIHIR MONDAL HOUSE TO BOTTH GHOSH HOUSE AT BHADISWAR |
100000 |
CONSTRUCTION OF PCC ROAD FROM MIHIR MONDAL HOUSE TO BOTTH GHOSH HOUSE AT BHADISWAR |
Completion of work |
-
latitude : 24.44231725,24.4420532
Longitude : 87.8604511,87.86018377
file name : Image_18122020162314043.png
|
2020-12-18 16:23:14.143099 |
116 |
34477977 |
UPGRADATION OF PCC ROAD FROM RAJIBUL MONDAL HOUSE TO MANTU SK HOUSE |
190000 |
UPGRADATION OF PCC ROAD FROM RAJIBUL MONDAL HOUSE TO MANTU SK HOUSE |
Plinth level |
-
latitude : 24.4455249,24.4455249
Longitude : 87.8540067,87.8540067
file name : Image_08012021134028635.png
|
2021-01-08 13:40:28.736915 |
117 |
34477977 |
UPGRADATION OF PCC ROAD FROM RAJIBUL MONDAL HOUSE TO MANTU SK HOUSE |
190000 |
UPGRADATION OF PCC ROAD FROM RAJIBUL MONDAL HOUSE TO MANTU SK HOUSE |
Plinth level |
-
latitude : 24.4455249,24.4455249
Longitude : 87.8540067,87.8540067
file name : Image_08012021133204576.png
|
2021-01-08 13:32:04.691331 |
118 |
34477977 |
UPGRADATION OF PCC ROAD FROM RAJIBUL MONDAL HOUSE TO MANTU SK HOUSE |
190000 |
UPGRADATION OF PCC ROAD FROM RAJIBUL MONDAL HOUSE TO MANTU SK HOUSE |
Completion of work |
-
latitude : 24.43761923,24.43765954
Longitude : 87.84628117,87.84632264
file name : Image_17122020113104623.png
|
2020-12-17 11:31:04.737636 |
119 |
34502396 |
UPGRADATION OF PCC ROAD FROM TARUN PAL HOUSE TO RAJ BHIKKHUK RABIDAS HOUSE AT GOPALPUR |
110000 |
UPGRADATION OF PCC ROAD FROM TARUN PAL HOUSE TO RAJ BHIKKHUK RABIDAS HOUSE AT GOPALPUR1 |
Plinth level |
-
latitude : 24.44310472,24.44310455
Longitude : 87.86070043,87.8607004
file name : Image_08012021151654741.png
|
2021-01-08 15:16:54.829574 |
120 |
34502396 |
UPGRADATION OF PCC ROAD FROM TARUN PAL HOUSE TO RAJ BHIKKHUK RABIDAS HOUSE AT GOPALPUR |
110000 |
UPGRADATION OF PCC ROAD FROM TARUN PAL HOUSE TO RAJ BHIKKHUK RABIDAS HOUSE AT GOPALPUR1 |
Plinth level |
-
latitude : 24.43514926,24.43517781
Longitude : 87.87377086,87.87376948
file name : Image_07012021162534440.png
|
2021-01-07 16:25:34.537912 |
121 |
34502396 |
UPGRADATION OF PCC ROAD FROM TARUN PAL HOUSE TO RAJ BHIKKHUK RABIDAS HOUSE AT GOPALPUR |
110000 |
UPGRADATION OF PCC ROAD FROM TARUN PAL HOUSE TO RAJ BHIKKHUK RABIDAS HOUSE AT GOPALPUR1 |
Plinth level |
-
latitude : 24.43514926,24.43517781
Longitude : 87.87377086,87.87376948
file name : Image_07012021162607707.png
|
2021-01-07 16:26:07.804182 |
122 |
34502396 |
UPGRADATION OF PCC ROAD FROM TARUN PAL HOUSE TO RAJ BHIKKHUK RABIDAS HOUSE AT GOPALPUR |
110000 |
UPGRADATION OF PCC ROAD FROM TARUN PAL HOUSE TO RAJ BHIKKHUK RABIDAS HOUSE AT GOPALPUR1 |
Completion of work |
-
latitude : 24.43569748,24.43571358
Longitude : 87.86480309,87.86477508
file name : Image_19122020115815227.png
|
2020-12-19 11:58:15.336464 |
123 |
34790190 |
UPGRADATION OF PCC ROAD FROM DALIM SK HOUSE TO KIRON SK HOUSE AT GHUSKIRA |
120000 |
UPGRADATION OF PCC ROAD FROM DALIM SK HOUSE TO KIRON SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41923423,24.41923714
Longitude : 87.86022015,87.86020037
file name : Image_08012021121328794.png
|
2021-01-08 12:13:28.896805 |
124 |
34790190 |
UPGRADATION OF PCC ROAD FROM DALIM SK HOUSE TO KIRON SK HOUSE AT GHUSKIRA |
120000 |
UPGRADATION OF PCC ROAD FROM DALIM SK HOUSE TO KIRON SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.4193248,24.4193248
Longitude : 87.859373,87.859373
file name : Image_08012021120212726.png
|
2021-01-08 12:02:12.813149 |
125 |
34790190 |
UPGRADATION OF PCC ROAD FROM DALIM SK HOUSE TO KIRON SK HOUSE AT GHUSKIRA |
120000 |
UPGRADATION OF PCC ROAD FROM DALIM SK HOUSE TO KIRON SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41924808,24.41926714
Longitude : 87.8600529,87.85997889
file name : Image_08012021114447958.png
|
2021-01-08 11:44:48.069317 |
126 |
34790190 |
UPGRADATION OF PCC ROAD FROM DALIM SK HOUSE TO KIRON SK HOUSE AT GHUSKIRA |
120000 |
UPGRADATION OF PCC ROAD FROM DALIM SK HOUSE TO KIRON SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41924808,24.41926714
Longitude : 87.8600529,87.85997889
file name : Image_08012021114523828.png
|
2021-01-08 11:45:23.945488 |
127 |
34790190 |
UPGRADATION OF PCC ROAD FROM DALIM SK HOUSE TO KIRON SK HOUSE AT GHUSKIRA |
120000 |
UPGRADATION OF PCC ROAD FROM DALIM SK HOUSE TO KIRON SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41932315,24.41925571
Longitude : 87.86027232,87.8602324
file name : Image_30122020160433853.png
|
2020-12-30 16:04:33.943234 |
128 |
34344483 |
UPGRADATION OF PCC ROAD FROM BASED SK HOUSE TO ANARUL SK HOUSE AT BHATPARA |
150000 |
UPGRADATION OF PCC ROAD FROM BASED SK HOUSE TO ANARUL SK HOUSE AT BHATPARA1 |
Roof laid |
-
latitude : 24.45734926,24.45736613
Longitude : 87.86372168,87.86365861
file name : Image_13022021104718498.png
|
2021-02-13 10:47:18.601623 |
129 |
34344483 |
UPGRADATION OF PCC ROAD FROM BASED SK HOUSE TO ANARUL SK HOUSE AT BHATPARA |
150000 |
UPGRADATION OF PCC ROAD FROM BASED SK HOUSE TO ANARUL SK HOUSE AT BHATPARA1 |
Roof laid |
-
latitude : 24.45742559,24.45738758
Longitude : 87.86330242,87.86338115
file name : Image_13022021104557387.png
|
2021-02-13 10:45:57.491387 |
130 |
34344483 |
UPGRADATION OF PCC ROAD FROM BASED SK HOUSE TO ANARUL SK HOUSE AT BHATPARA |
150000 |
UPGRADATION OF PCC ROAD FROM BASED SK HOUSE TO ANARUL SK HOUSE AT BHATPARA1 |
Roof laid |
-
latitude : 24.45735829,24.45735912
Longitude : 87.86356296,87.86359395
file name : Image_13022021104633676.png
|
2021-02-13 10:46:33.780058 |
131 |
34344483 |
UPGRADATION OF PCC ROAD FROM BASED SK HOUSE TO ANARUL SK HOUSE AT BHATPARA |
150000 |
UPGRADATION OF PCC ROAD FROM BASED SK HOUSE TO ANARUL SK HOUSE AT BHATPARA1 |
Plinth level |
-
latitude : 24.45390948,24.4539467
Longitude : 87.84838862,87.84844005
file name : Image_08012021135623271.png
|
2021-01-08 13:56:23.379431 |
132 |
34344483 |
UPGRADATION OF PCC ROAD FROM BASED SK HOUSE TO ANARUL SK HOUSE AT BHATPARA |
150000 |
UPGRADATION OF PCC ROAD FROM BASED SK HOUSE TO ANARUL SK HOUSE AT BHATPARA1 |
Completion of work |
-
latitude : 24.45395802,24.45398877
Longitude : 87.84845051,87.84843604
file name : Image_19122020124659972.png
|
2020-12-19 12:47:00.073436 |
133 |
47148652 |
CONST OF CONCRETE ROAD FROM LOKIM DEWAN TO SOBUR DEWAN HOUSE VIA ALAM DEWAN HOUSE AT PANIARA |
120000 |
CONST OF CONCRETE ROAD FROM LOKIM DEWAN TO SOBUR DEWAN HOUSE VIA ALAM DEWAN HOUSE AT PANIARA1 |
Roof laid |
-
latitude : 24.43869236,24.43868949
Longitude : 87.84628812,87.84628056
file name : Image_13022023134232076.png
|
2023-02-13 13:42:32.181189 |
134 |
47148652 |
CONST OF CONCRETE ROAD FROM LOKIM DEWAN TO SOBUR DEWAN HOUSE VIA ALAM DEWAN HOUSE AT PANIARA |
120000 |
CONST OF CONCRETE ROAD FROM LOKIM DEWAN TO SOBUR DEWAN HOUSE VIA ALAM DEWAN HOUSE AT PANIARA1 |
Plinth level |
-
latitude : 24.43861427,24.43862092
Longitude : 87.84621338,87.84620051
file name : Image_07022023121041085.png
|
2023-02-07 12:10:41.213849 |
135 |
47148652 |
CONST OF CONCRETE ROAD FROM LOKIM DEWAN TO SOBUR DEWAN HOUSE VIA ALAM DEWAN HOUSE AT PANIARA |
120000 |
CONST OF CONCRETE ROAD FROM LOKIM DEWAN TO SOBUR DEWAN HOUSE VIA ALAM DEWAN HOUSE AT PANIARA1 |
Completion of work |
-
latitude : 24.43872712,24.43872098
Longitude : 87.84624087,87.84623427
file name : Image_03022023121119667.png
|
2023-02-03 12:11:19.781299 |
136 |
39074945 |
PURCHASE OF TUBEWELL MATERIAL FOR SANSADS I TO XII UNDER MURARAI GRAM PANCHAYAT |
495000 |
PURCHASE OF TUBEWELL MATERIAL FOR SANSADS I TO XII UNDER MURARAI GRAM PANCHAYAT1 |
Completion of work |
-
latitude : 24.4403983
Longitude : 87.856473
file name : Image_11042022161457364.png
|
2022-04-11 16:14:57.447248 |
137 |
39074945 |
PURCHASE OF TUBEWELL MATERIAL FOR SANSADS I TO XII UNDER MURARAI GRAM PANCHAYAT |
495000 |
PURCHASE OF TUBEWELL MATERIAL FOR SANSADS I TO XII UNDER MURARAI GRAM PANCHAYAT1 |
Completion of work |
-
latitude : 24.4403514
Longitude : 87.8564371
file name : Image_11042022161500233.png
|
2022-04-11 16:15:00.313961 |
138 |
39074945 |
PURCHASE OF TUBEWELL MATERIAL FOR SANSADS I TO XII UNDER MURARAI GRAM PANCHAYAT |
495000 |
PURCHASE OF TUBEWELL MATERIAL FOR SANSADS I TO XII UNDER MURARAI GRAM PANCHAYAT1 |
Completion of work |
-
latitude : 24.4403983
Longitude : 87.856473
file name : Image_11042022161502975.png
|
2022-04-11 16:15:03.056499 |
139 |
34484944 |
UPGRADATION OF PCC ROAD FROM ANSARUL SK HOUSE TO PITCH ROAD AT BHADISWAR |
140000 |
UPGRADATION OF PCC ROAD FROM ANSARUL SK HOUSE TO PITCH ROAD AT BHADISWAR1 |
Completion of work |
-
latitude : 24.45382619,24.45380745
Longitude : 87.84838607,87.84837691
file name : Image_08012021141921659.png
|
2021-01-08 14:19:21.742792 |
140 |
34484944 |
UPGRADATION OF PCC ROAD FROM ANSARUL SK HOUSE TO PITCH ROAD AT BHADISWAR |
140000 |
UPGRADATION OF PCC ROAD FROM ANSARUL SK HOUSE TO PITCH ROAD AT BHADISWAR1 |
Completion of work |
-
latitude : 24.45380537,24.45380191
Longitude : 87.84838184,87.84837079
file name : Image_08012021141332346.png
|
2021-01-08 14:13:32.427775 |
141 |
34484944 |
UPGRADATION OF PCC ROAD FROM ANSARUL SK HOUSE TO PITCH ROAD AT BHADISWAR |
140000 |
UPGRADATION OF PCC ROAD FROM ANSARUL SK HOUSE TO PITCH ROAD AT BHADISWAR1 |
Completion of work |
-
latitude : 24.43921923,24.43949717
Longitude : 87.86875533,87.86883351
file name : Image_03012021121349224.png
|
2021-01-03 12:13:49.315486 |
142 |
34484944 |
UPGRADATION OF PCC ROAD FROM ANSARUL SK HOUSE TO PITCH ROAD AT BHADISWAR |
140000 |
UPGRADATION OF PCC ROAD FROM ANSARUL SK HOUSE TO PITCH ROAD AT BHADISWAR1 |
Completion of work |
-
latitude : 24.43955035,24.43959158
Longitude : 87.86885419,87.86888395
file name : Image_24122020123544441.png
|
2020-12-24 12:35:44.545347 |
143 |
34495037 |
UPGRADATION OF PCC ROAD FROM BIKAS DAS HOUSE TO PANDIT HOUSE VIA DAS HOUSE AT BHADISWAR |
100000 |
UPGRADATION OF PCC ROAD FROM BIKAS DAS HOUSE TO PANDIT HOUSE VIA DAS HOUSE AT BHADISWAR1 |
Plinth level |
-
latitude : 24.44278735,24.44280666
Longitude : 87.86061207,87.86059204
file name : Image_08012021151040372.png
|
2021-01-08 15:10:40.456089 |
144 |
34495037 |
UPGRADATION OF PCC ROAD FROM BIKAS DAS HOUSE TO PANDIT HOUSE VIA DAS HOUSE AT BHADISWAR |
100000 |
UPGRADATION OF PCC ROAD FROM BIKAS DAS HOUSE TO PANDIT HOUSE VIA DAS HOUSE AT BHADISWAR1 |
Plinth level |
-
latitude : 24.4411096,24.44277101
Longitude : 87.8624945,87.86060379
file name : Image_03012021125442005.png
|
2021-01-03 12:54:42.105871 |
145 |
34495037 |
UPGRADATION OF PCC ROAD FROM BIKAS DAS HOUSE TO PANDIT HOUSE VIA DAS HOUSE AT BHADISWAR |
100000 |
UPGRADATION OF PCC ROAD FROM BIKAS DAS HOUSE TO PANDIT HOUSE VIA DAS HOUSE AT BHADISWAR1 |
Completion of work |
-
latitude : 24.44314027,24.44300388
Longitude : 87.86070889,87.86070216
file name : Image_24122020122501684.png
|
2020-12-24 12:25:01.776803 |
146 |
34495037 |
UPGRADATION OF PCC ROAD FROM BIKAS DAS HOUSE TO PANDIT HOUSE VIA DAS HOUSE AT BHADISWAR |
100000 |
UPGRADATION OF PCC ROAD FROM BIKAS DAS HOUSE TO PANDIT HOUSE VIA DAS HOUSE AT BHADISWAR1 |
Completion of work |
-
latitude : 24.44276783,24.44259309
Longitude : 87.86065127,87.86059036
file name : Image_18122020162142640.png
|
2020-12-18 16:21:42.728702 |
147 |
34789748 |
UPGRADATION OF PCC ROAD FROM ALOMGIR SK HOUSE TO BOJLE SK HOUSE AT GHUSKIRA |
90000 |
UPGRADATION OF PCC ROAD FROM ALOMGIR SK HOUSE TO BOJLE SK HOUSE AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.41776384,24.41781488
Longitude : 87.8573171,87.85730588
file name : Image_01022021122624764.png
|
2021-02-01 12:26:24.860365 |
148 |
34789748 |
UPGRADATION OF PCC ROAD FROM ALOMGIR SK HOUSE TO BOJLE SK HOUSE AT GHUSKIRA |
90000 |
UPGRADATION OF PCC ROAD FROM ALOMGIR SK HOUSE TO BOJLE SK HOUSE AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.41780031,24.41780233
Longitude : 87.85727208,87.85728081
file name : Image_01022021122711403.png
|
2021-02-01 12:27:11.496558 |
149 |
34789748 |
UPGRADATION OF PCC ROAD FROM ALOMGIR SK HOUSE TO BOJLE SK HOUSE AT GHUSKIRA |
90000 |
UPGRADATION OF PCC ROAD FROM ALOMGIR SK HOUSE TO BOJLE SK HOUSE AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.41780031,24.41780233
Longitude : 87.85727208,87.85728081
file name : Image_01022021122752493.png
|
2021-02-01 12:27:52.591426 |
150 |
34789748 |
UPGRADATION OF PCC ROAD FROM ALOMGIR SK HOUSE TO BOJLE SK HOUSE AT GHUSKIRA |
90000 |
UPGRADATION OF PCC ROAD FROM ALOMGIR SK HOUSE TO BOJLE SK HOUSE AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.41778904,24.41779621
Longitude : 87.85730028,87.85730321
file name : Image_01022021123012803.png
|
2021-02-01 12:30:12.901894 |
151 |
34789748 |
UPGRADATION OF PCC ROAD FROM ALOMGIR SK HOUSE TO BOJLE SK HOUSE AT GHUSKIRA |
90000 |
UPGRADATION OF PCC ROAD FROM ALOMGIR SK HOUSE TO BOJLE SK HOUSE AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.41939597,24.41938685
Longitude : 87.85953859,87.85941942
file name : Image_30122020160510360.png
|
2020-12-30 16:05:10.441993 |
152 |
34789748 |
UPGRADATION OF PCC ROAD FROM ALOMGIR SK HOUSE TO BOJLE SK HOUSE AT GHUSKIRA |
90000 |
UPGRADATION OF PCC ROAD FROM ALOMGIR SK HOUSE TO BOJLE SK HOUSE AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.41939597,24.41938685
Longitude : 87.85953859,87.85941942
file name : Image_30122020160350709.png
|
2020-12-30 16:03:50.796316 |
153 |
34789748 |
UPGRADATION OF PCC ROAD FROM ALOMGIR SK HOUSE TO BOJLE SK HOUSE AT GHUSKIRA |
90000 |
UPGRADATION OF PCC ROAD FROM ALOMGIR SK HOUSE TO BOJLE SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41863839,24.41850989
Longitude : 87.85337714,87.85325685
file name : Image_22122020162853719.png
|
2020-12-22 16:28:53.818571 |
154 |
34487445 |
UPGRADATION OF PCC ROAD FROM PANCHKORI ROY HOUSE TO GOPAL MANDIR AT BHADISWAR |
170000 |
UPGRADATION OF PCC ROAD FROM PANCHKORI ROY HOUSE TO GOPAL MANDIR AT BHADISWAR1 |
Plinth level |
-
latitude : 24.440756,24.440756
Longitude : 87.8648157,87.8648157
file name : Image_29102021145037945.png
|
2021-10-29 14:50:38.054305 |
155 |
34487445 |
UPGRADATION OF PCC ROAD FROM PANCHKORI ROY HOUSE TO GOPAL MANDIR AT BHADISWAR |
170000 |
UPGRADATION OF PCC ROAD FROM PANCHKORI ROY HOUSE TO GOPAL MANDIR AT BHADISWAR1 |
Plinth level |
-
latitude : 24.4406789,24.4406789
Longitude : 87.8649294,87.8649294
file name : Image_28102021152914074.png
|
2021-10-28 15:29:14.189513 |
156 |
34487445 |
UPGRADATION OF PCC ROAD FROM PANCHKORI ROY HOUSE TO GOPAL MANDIR AT BHADISWAR |
170000 |
UPGRADATION OF PCC ROAD FROM PANCHKORI ROY HOUSE TO GOPAL MANDIR AT BHADISWAR1 |
Completion of work |
-
latitude : 24.43916248,24.44071648
Longitude : 87.85817599,87.86492939
file name : Image_18122020160741948.png
|
2020-12-18 16:07:42.03848 |
157 |
34464082 |
UPGRADATION OF ROAD PROTECTION GUARDWALL OF SIMULTALA PUKUR FROM AKBAR SK HOUSE AT GD PARA |
180638 |
UPGRADATION OF ROAD PROTECTION GUARDWALL OF SIMULTALA PUKUR FROM AKBAR SK HOUSE AT GD PARA1 |
Completion of work |
-
latitude : 24.444601666666667
Longitude : 87.85826333333334
file name : Image_27122021152227704.png
|
2021-12-27 15:22:27.806075 |
158 |
34464082 |
UPGRADATION OF ROAD PROTECTION GUARDWALL OF SIMULTALA PUKUR FROM AKBAR SK HOUSE AT GD PARA |
180638 |
UPGRADATION OF ROAD PROTECTION GUARDWALL OF SIMULTALA PUKUR FROM AKBAR SK HOUSE AT GD PARA1 |
Completion of work |
-
latitude : 24.44466166666667
Longitude : 87.858385
file name : Image_27122021152230511.png
|
2021-12-27 15:22:30.610223 |
159 |
34464082 |
UPGRADATION OF ROAD PROTECTION GUARDWALL OF SIMULTALA PUKUR FROM AKBAR SK HOUSE AT GD PARA |
180638 |
UPGRADATION OF ROAD PROTECTION GUARDWALL OF SIMULTALA PUKUR FROM AKBAR SK HOUSE AT GD PARA1 |
Completion of work |
-
latitude : 24.444601666666667
Longitude : 87.85826333333334
file name : Image_27122021152233333.png
|
2021-12-27 15:22:33.441257 |
160 |
47147084 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM NURE ALAM TO EKAMAT SK HOUSE AT MURARAI |
200000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM NURE ALAM TO EKAMAT SK HOUSE AT MURARAI1 |
Completion of work |
-
latitude : 24.4442365,24.4443808
Longitude : 87.8529927,87.8532033
file name : Image_10032022145705443.png
|
2022-03-10 14:57:05.57493 |
161 |
47147084 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM NURE ALAM TO EKAMAT SK HOUSE AT MURARAI |
200000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM NURE ALAM TO EKAMAT SK HOUSE AT MURARAI1 |
Completion of work |
-
latitude : 24.4444111,24.4451566
Longitude : 87.8531062,87.8531869
file name : Image_10032022145701588.png
|
2022-03-10 14:57:01.697738 |
162 |
47147084 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM NURE ALAM TO EKAMAT SK HOUSE AT MURARAI |
200000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM NURE ALAM TO EKAMAT SK HOUSE AT MURARAI1 |
Completion of work |
-
latitude : 24.4442504,24.4442702
Longitude : 87.8529449,87.8530561
file name : Image_10032022145708891.png
|
2022-03-10 14:57:09.01239 |
163 |
47147084 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM NURE ALAM TO EKAMAT SK HOUSE AT MURARAI |
200000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM NURE ALAM TO EKAMAT SK HOUSE AT MURARAI1 |
Completion of work |
-
latitude : 24.444312,24.4442455
Longitude : 87.8531265,87.8528923
file name : Image_10032022145711975.png
|
2022-03-10 14:57:12.076877 |
164 |
47147084 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM NURE ALAM TO EKAMAT SK HOUSE AT MURARAI |
200000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM NURE ALAM TO EKAMAT SK HOUSE AT MURARAI1 |
Completion of work |
-
latitude : 24.4444864,24.444031666666667
Longitude : 87.8527213,87.85261666666665
file name : Image_08022022134106058.png
|
2022-02-08 13:41:06.236865 |
165 |
47147044 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SOHID SK TO BOKUL SK HOUSE AT PANIARA |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SOHID SK TO BOKUL SK HOUSE AT PANIARA1 |
Completion of work |
-
latitude : 24.4403209,24.4403209,24.4403209
Longitude : 87.8561991,87.8561991,87.8561991
file name : Image_03032022142857365.png
|
2022-03-03 14:28:57.484869 |
166 |
47147044 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SOHID SK TO BOKUL SK HOUSE AT PANIARA |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SOHID SK TO BOKUL SK HOUSE AT PANIARA1 |
Completion of work |
-
latitude : 24.4403209,24.4403209,24.4403209
Longitude : 87.8561991,87.8561991,87.8561991
file name : Image_03032022142847843.png
|
2022-03-03 14:28:47.939157 |
167 |
47147044 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SOHID SK TO BOKUL SK HOUSE AT PANIARA |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SOHID SK TO BOKUL SK HOUSE AT PANIARA1 |
Completion of work |
-
latitude : 24.4403209,24.4403209
Longitude : 87.8561991,87.8561991
file name : Image_03032022142841676.png
|
2022-03-03 14:28:41.781355 |
168 |
47147044 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SOHID SK TO BOKUL SK HOUSE AT PANIARA |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SOHID SK TO BOKUL SK HOUSE AT PANIARA1 |
Completion of work |
-
latitude : 24.4403209,24.4403209
Longitude : 87.8561991,87.8561991
file name : Image_03032022142844691.png
|
2022-03-03 14:28:44.784503 |
169 |
47147044 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SOHID SK TO BOKUL SK HOUSE AT PANIARA |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SOHID SK TO BOKUL SK HOUSE AT PANIARA1 |
Completion of work |
-
latitude : 24.4403209,24.4403209
Longitude : 87.8561991,87.8561991
file name : Image_03032022142854467.png
|
2022-03-03 14:28:54.558598 |
170 |
47147044 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SOHID SK TO BOKUL SK HOUSE AT PANIARA |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SOHID SK TO BOKUL SK HOUSE AT PANIARA1 |
Completion of work |
-
latitude : 24.4407663,24.4407663
Longitude : 87.8541559,87.8541559
file name : Image_10022022151119890.png
|
2022-02-10 15:11:19.989793 |
171 |
56786811 |
CONS CHATAL AND COLOUR PAINT NAME PLATE OF THE MUKHAGNI BEDI INCL TUBEWELL AND S LIGHT AT BHADISWAR |
274110 |
CONS CHATAL AND COLOUR PAINT NAME PLATE OF THE MUKHAGNI BEDI INCL TUBEWELL AND S LIGHT AT BHADISWAR1 |
Roof laid |
-
latitude : 24.43875335,24.43875257
Longitude : 87.87356781,87.87354654
file name : Image_16022023145827054.png
|
2023-02-16 14:58:27.170176 |
172 |
56786811 |
CONS CHATAL AND COLOUR PAINT NAME PLATE OF THE MUKHAGNI BEDI INCL TUBEWELL AND S LIGHT AT BHADISWAR |
274110 |
CONS CHATAL AND COLOUR PAINT NAME PLATE OF THE MUKHAGNI BEDI INCL TUBEWELL AND S LIGHT AT BHADISWAR1 |
Plinth level |
-
latitude : 24.43872904,24.43873785
Longitude : 87.87352253,87.8735215
file name : Image_16022023145543031.png
|
2023-02-16 14:55:43.132702 |
173 |
56786811 |
CONS CHATAL AND COLOUR PAINT NAME PLATE OF THE MUKHAGNI BEDI INCL TUBEWELL AND S LIGHT AT BHADISWAR |
274110 |
CONS CHATAL AND COLOUR PAINT NAME PLATE OF THE MUKHAGNI BEDI INCL TUBEWELL AND S LIGHT AT BHADISWAR1 |
Completion of work |
-
latitude : 24.43872503,24.4387279
Longitude : 87.87350948,87.87352687
file name : Image_16022023145112775.png
|
2023-02-16 14:51:12.90325 |
174 |
39079606 |
MAINTANANCE OF PIPE LINE FROM MATRA PARA SHIBTALA AT GOPALPUR |
80000 |
MAINTANANCE OF PIPE LINE FROM MATRA PARA SHIBTALA AT GOPALPUR1 |
Completion of work |
-
latitude : 24.43458666666667,24.434608333333337
Longitude : 87.86583833333334,87.86579166666667
file name : Image_12042022163215101.png
|
2022-04-12 16:32:15.208001 |
175 |
39079606 |
MAINTANANCE OF PIPE LINE FROM MATRA PARA SHIBTALA AT GOPALPUR |
80000 |
MAINTANANCE OF PIPE LINE FROM MATRA PARA SHIBTALA AT GOPALPUR1 |
Completion of work |
-
latitude : 24.43461333333333,24.43458666666667
Longitude : 87.86584333333333,87.86584666666667
file name : Image_12042022163131282.png
|
2022-04-12 16:31:31.400055 |
176 |
39079606 |
MAINTANANCE OF PIPE LINE FROM MATRA PARA SHIBTALA AT GOPALPUR |
80000 |
MAINTANANCE OF PIPE LINE FROM MATRA PARA SHIBTALA AT GOPALPUR1 |
Completion of work |
-
latitude : 24.43456,24.434578333333334
Longitude : 87.86599499999998,87.86581833333334
file name : Image_12042022163037371.png
|
2022-04-12 16:30:37.491589 |
177 |
34334071 |
MAINTANENCE OF SOLAR LIGHTS AT VARIOUS LOCATIONS UNDER MURARAI G.P. |
98000 |
MAINTANENCE OF SOLAR LIGHTS AT VARIOUS LOCATIONS UNDER MURARAI G.P.1 |
Completion of work |
-
latitude : 24.4402866
Longitude : 87.856358
file name : Image_11032022155353792.png
|
2022-03-11 15:53:53.901661 |
178 |
34334071 |
MAINTANENCE OF SOLAR LIGHTS AT VARIOUS LOCATIONS UNDER MURARAI G.P. |
98000 |
MAINTANENCE OF SOLAR LIGHTS AT VARIOUS LOCATIONS UNDER MURARAI G.P.1 |
Completion of work |
-
latitude : 24.4402625
Longitude : 87.8563963
file name : Image_11032022155313857.png
|
2022-03-11 15:53:13.971606 |
179 |
34334071 |
MAINTANENCE OF SOLAR LIGHTS AT VARIOUS LOCATIONS UNDER MURARAI G.P. |
98000 |
MAINTANENCE OF SOLAR LIGHTS AT VARIOUS LOCATIONS UNDER MURARAI G.P.1 |
Completion of work |
-
latitude : 24.4403257
Longitude : 87.8562995
file name : Image_11032022155237432.png
|
2022-03-11 15:52:37.547166 |
180 |
34471674 |
INSTALLATION OF SOLAR LIGHTS: NEAR-1) MANASA MANDIR(HAJRA DIGI), 2)MURARAI BAZAR GURUDUARA, |
99000 |
INSTALLATION OF SOLAR LIGHTS: NEAR-1) MANASA MANDIR(HAJRA DIGI), 2)MURARAI BAZAR GURUDUARA,1 |
Completion of work |
-
latitude : 24.4388613
Longitude : 87.8573998
file name : Image_11022022160657151.png
|
2022-02-11 16:06:57.265483 |
181 |
34471674 |
INSTALLATION OF SOLAR LIGHTS: NEAR-1) MANASA MANDIR(HAJRA DIGI), 2)MURARAI BAZAR GURUDUARA, |
99000 |
INSTALLATION OF SOLAR LIGHTS: NEAR-1) MANASA MANDIR(HAJRA DIGI), 2)MURARAI BAZAR GURUDUARA,1 |
Completion of work |
-
latitude : 24.43799166666667
Longitude : 87.856105
file name : Image_11022022161150486.png
|
2022-02-11 16:11:50.597074 |
182 |
34471674 |
INSTALLATION OF SOLAR LIGHTS: NEAR-1) MANASA MANDIR(HAJRA DIGI), 2)MURARAI BAZAR GURUDUARA, |
99000 |
INSTALLATION OF SOLAR LIGHTS: NEAR-1) MANASA MANDIR(HAJRA DIGI), 2)MURARAI BAZAR GURUDUARA,1 |
Completion of work |
-
latitude : 24.438656666666663
Longitude : 87.85717500000001
file name : Image_11022022161445259.png
|
2022-02-11 16:14:45.372111 |
183 |
39079683 |
RENOVATION OF HEALTH SUB CENTRE INCLUDING TOILET AT GHUSKIRA |
50000 |
RENOVATION OF HEALTH SUB CENTRE INCLUDING TOILET AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.42187666666667
Longitude : 87.85452333333333
file name : Image_19012022114105334.png
|
2022-01-19 11:41:05.454656 |
184 |
39079683 |
RENOVATION OF HEALTH SUB CENTRE INCLUDING TOILET AT GHUSKIRA |
50000 |
RENOVATION OF HEALTH SUB CENTRE INCLUDING TOILET AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.421826666666668
Longitude : 87.85449333333332
file name : Image_19012022114143220.png
|
2022-01-19 11:41:43.32129 |
185 |
39079683 |
RENOVATION OF HEALTH SUB CENTRE INCLUDING TOILET AT GHUSKIRA |
50000 |
RENOVATION OF HEALTH SUB CENTRE INCLUDING TOILET AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.421788333333332
Longitude : 87.85447833333335
file name : Image_19012022114226045.png
|
2022-01-19 11:42:26.150866 |
186 |
39070581 |
MAINTENANCE OF GRAM PANCHAYAT OFFICE TOILET AND OTHERS INCLUDING COLORING UNDER MURARAI GP |
60000 |
MAINTENANCE OF GRAM PANCHAYAT OFFICE TOILET AND OTHERS INCLUDING COLORING UNDER MURARAI GP1 |
Completion of work |
-
latitude : 24.44026666666667
Longitude : 87.85630833333335
file name : Image_05012022123728067.png
|
2022-01-05 12:37:28.329786 |
187 |
39070581 |
MAINTENANCE OF GRAM PANCHAYAT OFFICE TOILET AND OTHERS INCLUDING COLORING UNDER MURARAI GP |
60000 |
MAINTENANCE OF GRAM PANCHAYAT OFFICE TOILET AND OTHERS INCLUDING COLORING UNDER MURARAI GP1 |
Completion of work |
-
latitude : 24.440205
Longitude : 87.85632
file name : Image_05012022123858430.png
|
2022-01-05 12:38:58.544483 |
188 |
39070581 |
MAINTENANCE OF GRAM PANCHAYAT OFFICE TOILET AND OTHERS INCLUDING COLORING UNDER MURARAI GP |
60000 |
MAINTENANCE OF GRAM PANCHAYAT OFFICE TOILET AND OTHERS INCLUDING COLORING UNDER MURARAI GP1 |
Completion of work |
-
latitude : 24.44017
Longitude : 87.85634333333334
file name : Image_05012022123944568.png
|
2022-01-05 12:39:44.67058 |
189 |
47147154 |
CONST OF CONCRETE PUCCA DRAIN WITH RCC COVER SLAB FROM MIR JUMLA MASTER TO RAMKRISHNA DUTTA HOUSE AT |
200000 |
CONST OF CONCRETE PUCCA DRAIN WITH RCC COVER SLAB FROM MIR JUMLA MASTER TO RAMKRISHNA DUTTA HOUSE AT |
Completion of work |
-
latitude : 24.4403961,24.4404023
Longitude : 87.8557504,87.855714
file name : Image_08022022133724573.png
|
2022-02-08 13:37:24.672994 |
190 |
47147154 |
CONST OF CONCRETE PUCCA DRAIN WITH RCC COVER SLAB FROM MIR JUMLA MASTER TO RAMKRISHNA DUTTA HOUSE AT |
200000 |
CONST OF CONCRETE PUCCA DRAIN WITH RCC COVER SLAB FROM MIR JUMLA MASTER TO RAMKRISHNA DUTTA HOUSE AT |
Completion of work |
-
latitude : 24.4404051,24.4404042
Longitude : 87.85569,87.8556853
file name : Image_04032022154013062.png
|
2022-03-04 15:40:13.167115 |
191 |
47147154 |
CONST OF CONCRETE PUCCA DRAIN WITH RCC COVER SLAB FROM MIR JUMLA MASTER TO RAMKRISHNA DUTTA HOUSE AT |
200000 |
CONST OF CONCRETE PUCCA DRAIN WITH RCC COVER SLAB FROM MIR JUMLA MASTER TO RAMKRISHNA DUTTA HOUSE AT |
Completion of work |
-
latitude : 24.44029666666667,24.44053666666667
Longitude : 87.85634,87.85567
file name : Image_04032022153922712.png
|
2022-03-04 15:39:22.840121 |
192 |
47147154 |
CONST OF CONCRETE PUCCA DRAIN WITH RCC COVER SLAB FROM MIR JUMLA MASTER TO RAMKRISHNA DUTTA HOUSE AT |
200000 |
CONST OF CONCRETE PUCCA DRAIN WITH RCC COVER SLAB FROM MIR JUMLA MASTER TO RAMKRISHNA DUTTA HOUSE AT |
Completion of work |
-
latitude : 24.4404048,24.4404048
Longitude : 87.8556905,87.8556905
file name : Image_04032022154138525.png
|
2022-03-04 15:41:38.633936 |
193 |
47147154 |
CONST OF CONCRETE PUCCA DRAIN WITH RCC COVER SLAB FROM MIR JUMLA MASTER TO RAMKRISHNA DUTTA HOUSE AT |
200000 |
CONST OF CONCRETE PUCCA DRAIN WITH RCC COVER SLAB FROM MIR JUMLA MASTER TO RAMKRISHNA DUTTA HOUSE AT |
Completion of work |
-
latitude : 24.4404041,24.4404044
Longitude : 87.8556876,87.8556889
file name : Image_04032022154047789.png
|
2022-03-04 15:40:47.89269 |
194 |
39080136 |
UPGRADATION OF PCC ROAD FROM SANKAR MAL HOUSE TO TAMAL HOUSE AT GHUSKIRA |
40000 |
UPGRADATION OF PCC ROAD FROM SANKAR MAL HOUSE TO TAMAL HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.4402411,24.4402411
Longitude : 87.85639,87.85639
file name : Image_08102021115923961.png
|
2021-10-08 11:59:24.063288 |
195 |
39080136 |
UPGRADATION OF PCC ROAD FROM SANKAR MAL HOUSE TO TAMAL HOUSE AT GHUSKIRA |
40000 |
UPGRADATION OF PCC ROAD FROM SANKAR MAL HOUSE TO TAMAL HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.4402411,24.4402411
Longitude : 87.85639,87.85639
file name : Image_08102021120014126.png
|
2021-10-08 12:00:14.244901 |
196 |
39080136 |
UPGRADATION OF PCC ROAD FROM SANKAR MAL HOUSE TO TAMAL HOUSE AT GHUSKIRA |
40000 |
UPGRADATION OF PCC ROAD FROM SANKAR MAL HOUSE TO TAMAL HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.4402411,24.4402411
Longitude : 87.85639,87.85639
file name : Image_08102021120102038.png
|
2021-10-08 12:01:02.140352 |
197 |
47147274 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BASIR SK HOUSE TO PCC ROAD AT BHADISWAR |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BASIR SK HOUSE TO PCC ROAD AT BHADISWAR1 |
Completion of work |
-
latitude : 24.437716666666667,24.437746666666666
Longitude : 87.86470333333334,87.86465500000001
file name : Image_16022022165747050.png
|
2022-02-16 16:57:47.148388 |
198 |
47147274 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BASIR SK HOUSE TO PCC ROAD AT BHADISWAR |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BASIR SK HOUSE TO PCC ROAD AT BHADISWAR1 |
Completion of work |
-
latitude : 24.43776666666667,24.437773333333332
Longitude : 87.86457333333334,87.86453000000002
file name : Image_16022022165751738.png
|
2022-02-16 16:57:51.832359 |
199 |
47147274 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BASIR SK HOUSE TO PCC ROAD AT BHADISWAR |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BASIR SK HOUSE TO PCC ROAD AT BHADISWAR1 |
Completion of work |
-
latitude : 24.437659999999997,24.437661666666667
Longitude : 87.86487666666666,87.86487333333335
file name : Image_16022022114517337.png
|
2022-02-16 11:45:17.449477 |
200 |
47147292 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM ACHINTO DUTTA EAST SIDE TO BAMBOO HOUSE AT BHADIS |
250000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM ACHINTO DUTTA EAST SIDE TO BAMBOO HOUSE AT BHADIS |
Completion of work |
-
latitude : 24.4396664,24.4396599
Longitude : 87.863339,87.8633266
file name : Image_15022022123612937.png
|
2022-02-15 12:36:13.032771 |
201 |
47147292 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM ACHINTO DUTTA EAST SIDE TO BAMBOO HOUSE AT BHADIS |
250000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM ACHINTO DUTTA EAST SIDE TO BAMBOO HOUSE AT BHADIS |
Completion of work |
-
latitude : 24.4396727,24.4396536
Longitude : 87.8633462,87.8632958
file name : Image_15022022123620702.png
|
2022-02-15 12:36:20.807657 |
202 |
47147292 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM ACHINTO DUTTA EAST SIDE TO BAMBOO HOUSE AT BHADIS |
250000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM ACHINTO DUTTA EAST SIDE TO BAMBOO HOUSE AT BHADIS |
Completion of work |
-
latitude : 24.4396471,24.4396687
Longitude : 87.8632904,87.8633586
file name : Image_15022022123625871.png
|
2022-02-15 12:36:25.977438 |
203 |
47147292 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM ACHINTO DUTTA EAST SIDE TO BAMBOO HOUSE AT BHADIS |
250000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM ACHINTO DUTTA EAST SIDE TO BAMBOO HOUSE AT BHADIS |
Completion of work |
-
latitude : 24.4396471,24.4396687
Longitude : 87.8632904,87.8633586
file name : Image_15022022123640009.png
|
2022-02-15 12:36:40.119648 |
204 |
47147292 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM ACHINTO DUTTA EAST SIDE TO BAMBOO HOUSE AT BHADIS |
250000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM ACHINTO DUTTA EAST SIDE TO BAMBOO HOUSE AT BHADIS |
Completion of work |
-
latitude : 24.4396727,24.4396536
Longitude : 87.8633462,87.8632958
file name : Image_15022022123632118.png
|
2022-02-15 12:36:32.209367 |
205 |
34365498 |
UPGRADATION OF PUCCA DRAIN FROM ROMJAN SK HOUSE TO TANFUL SK HOUSE AT PANIARA |
100000 |
UPGRADATION OF PUCCA DRAIN FROM ROMJAN SK HOUSE TO TANFUL SK HOUSE AT PANIARA1 |
Completion of work |
-
latitude : 24.43695137,24.43692509
Longitude : 87.845025,87.84511492
file name : Image_08092021130951171.png
|
2021-09-08 13:09:51.289954 |
206 |
34365498 |
UPGRADATION OF PUCCA DRAIN FROM ROMJAN SK HOUSE TO TANFUL SK HOUSE AT PANIARA |
100000 |
UPGRADATION OF PUCCA DRAIN FROM ROMJAN SK HOUSE TO TANFUL SK HOUSE AT PANIARA1 |
Completion of work |
-
latitude : 24.43689541,24.43689557
Longitude : 87.84502874,87.8450291
file name : Image_03092021135255199.png
|
2021-09-03 13:52:55.308493 |
207 |
34365498 |
UPGRADATION OF PUCCA DRAIN FROM ROMJAN SK HOUSE TO TANFUL SK HOUSE AT PANIARA |
100000 |
UPGRADATION OF PUCCA DRAIN FROM ROMJAN SK HOUSE TO TANFUL SK HOUSE AT PANIARA1 |
Completion of work |
-
latitude : 24.43688339,24.43689523
Longitude : 87.84503946,87.8450262
file name : Image_03092021135151243.png
|
2021-09-03 13:51:51.352718 |
208 |
47161124 |
CONST OF ALL WEATHER ROAD WITH KOCHRA STONE LATERITE MORUM AND STONE DUST INCLUDING POWER ROLLER FRO |
150000 |
CONST OF ALL WEATHER ROAD WITH KOCHRA STONE LATERITE MORUM AND STONE DUST INCLUDING POWER ROLLER FRO |
Completion of work |
-
latitude : 24.430513333333337,24.430475
Longitude : 87.88024333333333,87.88021666666667
file name : Image_04032022150917422.png
|
2022-03-04 15:09:17.523998 |
209 |
47161124 |
CONST OF ALL WEATHER ROAD WITH KOCHRA STONE LATERITE MORUM AND STONE DUST INCLUDING POWER ROLLER FRO |
150000 |
CONST OF ALL WEATHER ROAD WITH KOCHRA STONE LATERITE MORUM AND STONE DUST INCLUDING POWER ROLLER FRO |
Completion of work |
-
latitude : 24.431213333333336,24.430841666666666
Longitude : 87.87973500000001,87.88016166666667
file name : Image_04032022150804223.png
|
2022-03-04 15:08:04.325948 |
210 |
47161124 |
CONST OF ALL WEATHER ROAD WITH KOCHRA STONE LATERITE MORUM AND STONE DUST INCLUDING POWER ROLLER FRO |
150000 |
CONST OF ALL WEATHER ROAD WITH KOCHRA STONE LATERITE MORUM AND STONE DUST INCLUDING POWER ROLLER FRO |
Completion of work |
-
latitude : 24.431618333333336,24.43152166666666
Longitude : 87.8789,87.87912666666668
file name : Image_04032022150656209.png
|
2022-03-04 15:06:56.305478 |
211 |
47147384 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM KADOM TOLA TO LOKHU SK HOUSE AT GHUSKIRA |
120000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM KADOM TOLA TO LOKHU SK HOUSE AT GHUSKIRA 1 |
Completion of work |
-
latitude : 24.4404075,24.4404075
Longitude : 87.8547306,87.8547306
file name : Image_03022022134219094.png
|
2022-02-03 13:42:19.189822 |
212 |
47147384 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM KADOM TOLA TO LOKHU SK HOUSE AT GHUSKIRA |
120000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM KADOM TOLA TO LOKHU SK HOUSE AT GHUSKIRA 1 |
Completion of work |
-
latitude : 24.4404075,24.4404075
Longitude : 87.8547306,87.8547306
file name : Image_03022022134224470.png
|
2022-02-03 13:42:24.572867 |
213 |
47147384 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM KADOM TOLA TO LOKHU SK HOUSE AT GHUSKIRA |
120000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM KADOM TOLA TO LOKHU SK HOUSE AT GHUSKIRA 1 |
Completion of work |
-
latitude : 24.4404075,24.4404075
Longitude : 87.8547306,87.8547306
file name : Image_03022022134214420.png
|
2022-02-03 13:42:14.538378 |
214 |
47160894 |
CONST OF ALL WEATHER ROAD WITH KOCHRA STONE LATERITE MORUM AND STONE DUST INCLUDING POWER ROLLER FRO |
150000 |
CONST OF ALL WEATHER ROAD WITH KOCHRA STONE LATERITE MORUM AND STONE DUST INCLUDING POWER ROLLER FRO |
Completion of work |
-
latitude : 24.432711666666666,24.432083333333335
Longitude : 87.87793833333332,87.87819166666668
file name : Image_04032022150511791.png
|
2022-03-04 15:05:11.903036 |
215 |
47160894 |
CONST OF ALL WEATHER ROAD WITH KOCHRA STONE LATERITE MORUM AND STONE DUST INCLUDING POWER ROLLER FRO |
150000 |
CONST OF ALL WEATHER ROAD WITH KOCHRA STONE LATERITE MORUM AND STONE DUST INCLUDING POWER ROLLER FRO |
Completion of work |
-
latitude : 24.432075,24.43175666666667
Longitude : 87.87819333333333,87.87863
file name : Image_04032022150610877.png
|
2022-03-04 15:06:10.972167 |
216 |
47160894 |
CONST OF ALL WEATHER ROAD WITH KOCHRA STONE LATERITE MORUM AND STONE DUST INCLUDING POWER ROLLER FRO |
150000 |
CONST OF ALL WEATHER ROAD WITH KOCHRA STONE LATERITE MORUM AND STONE DUST INCLUDING POWER ROLLER FRO |
Completion of work |
-
latitude : 24.43371833333333,24.43295333333333
Longitude : 87.87777166666667,87.877855
file name : Image_04032022150408700.png
|
2022-03-04 15:04:08.863839 |
217 |
47160894 |
CONST OF ALL WEATHER ROAD WITH KOCHRA STONE LATERITE MORUM AND STONE DUST INCLUDING POWER ROLLER FRO |
150000 |
CONST OF ALL WEATHER ROAD WITH KOCHRA STONE LATERITE MORUM AND STONE DUST INCLUDING POWER ROLLER FRO |
Completion of work |
-
latitude : 24.430453333333336,24.430578333333333
Longitude : 87.88020999999999,87.88027666666667
file name : Image_04032022151024293.png
|
2022-03-04 15:10:24.413023 |
218 |
47115521 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM RESINKING TUBEWELL AT MURARAI GOPALPUR MOHUL |
99000 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM RESINKING TUBEWELL AT MURARAI GOPALPUR MOHUL |
Completion of work |
-
latitude : 24.4402671
Longitude : 87.8563567
file name : Image_18022022160621749.png
|
2022-02-18 16:06:21.870432 |
219 |
47115521 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM RESINKING TUBEWELL AT MURARAI GOPALPUR MOHUL |
99000 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM RESINKING TUBEWELL AT MURARAI GOPALPUR MOHUL |
Completion of work |
-
latitude : 24.41243833333333
Longitude : 87.85893833333333
file name : Image_18022022160628809.png
|
2022-02-18 16:06:28.895133 |
220 |
47115521 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM RESINKING TUBEWELL AT MURARAI GOPALPUR MOHUL |
99000 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM RESINKING TUBEWELL AT MURARAI GOPALPUR MOHUL |
Completion of work |
-
latitude : 24.41243833333333
Longitude : 87.85893833333333
file name : Image_18022022160633762.png
|
2022-02-18 16:06:33.851369 |
221 |
47147396 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM PWD TO OYESH HOUSE AT GHUSKIRA |
202239 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM PWD TO OYESH HOUSE AT GHUSKIRA 1 |
Completion of work |
-
latitude : 24.418413333333334,24.418548333333334
Longitude : 87.85913166666666,87.85912833333332
file name : Image_16022022113357048.png
|
2022-02-16 11:33:57.160619 |
222 |
47147396 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM PWD TO OYESH HOUSE AT GHUSKIRA |
202239 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM PWD TO OYESH HOUSE AT GHUSKIRA 1 |
Completion of work |
-
latitude : 24.418588333333332,24.41858666666667
Longitude : 87.85900666666666,87.859075
file name : Image_16022022113458876.png
|
2022-02-16 11:34:58.981039 |
223 |
47147396 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM PWD TO OYESH HOUSE AT GHUSKIRA |
202239 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM PWD TO OYESH HOUSE AT GHUSKIRA 1 |
Completion of work |
-
latitude : 24.418564999999997,24.41857333333333
Longitude : 87.85914666666667,87.85922166666666
file name : Image_16022022113553222.png
|
2022-02-16 11:35:53.32906 |
224 |
47148270 |
CONST OF ROAD PROTECTION WALL BY BOULDER MASONRY FROM LALCHAND SK TO ABDUR ROB HOUSE AT DOMA PUKUR A |
272218 |
CONST OF ROAD PROTECTION WALL BY BOULDER MASONRY FROM LALCHAND SK TO ABDUR ROB HOUSE AT DOMA PUKUR A |
Completion of work |
-
latitude : 24.4403075
Longitude : 87.8562232
file name : Image_16022022165939236.png
|
2022-02-16 16:59:39.337113 |
225 |
47148270 |
CONST OF ROAD PROTECTION WALL BY BOULDER MASONRY FROM LALCHAND SK TO ABDUR ROB HOUSE AT DOMA PUKUR A |
272218 |
CONST OF ROAD PROTECTION WALL BY BOULDER MASONRY FROM LALCHAND SK TO ABDUR ROB HOUSE AT DOMA PUKUR A |
Completion of work |
-
latitude : 24.4403075
Longitude : 87.8562232
file name : Image_16022022165855249.png
|
2022-02-16 16:58:55.353435 |
226 |
47148270 |
CONST OF ROAD PROTECTION WALL BY BOULDER MASONRY FROM LALCHAND SK TO ABDUR ROB HOUSE AT DOMA PUKUR A |
272218 |
CONST OF ROAD PROTECTION WALL BY BOULDER MASONRY FROM LALCHAND SK TO ABDUR ROB HOUSE AT DOMA PUKUR A |
Completion of work |
-
latitude : 24.4403075
Longitude : 87.8562232
file name : Image_16022022170017970.png
|
2022-02-16 17:00:18.07418 |
227 |
47147070 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MOJAFFAR TO CHITU BHAKAT HOUSE AT GD PARA |
170000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MOJAFFAR TO CHITU BHAKAT HOUSE AT GD PARA1 |
Completion of work |
-
latitude : 24.44358833333333,24.44355666666667
Longitude : 87.85762833333335,87.85761666666667
file name : Image_16022022171109669.png
|
2022-02-16 17:11:09.776842 |
228 |
47147070 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MOJAFFAR TO CHITU BHAKAT HOUSE AT GD PARA |
170000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MOJAFFAR TO CHITU BHAKAT HOUSE AT GD PARA1 |
Completion of work |
-
latitude : 24.4425417,24.44345
Longitude : 87.8576131,87.85765500000001
file name : Image_16022022171218298.png
|
2022-02-16 17:12:18.378825 |
229 |
47147070 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MOJAFFAR TO CHITU BHAKAT HOUSE AT GD PARA |
170000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MOJAFFAR TO CHITU BHAKAT HOUSE AT GD PARA1 |
Completion of work |
-
latitude : 24.4425417,24.443473333333333
Longitude : 87.8576131,87.85762500000001
file name : Image_16022022171315458.png
|
2022-02-16 17:13:15.543011 |
230 |
34333513 |
REP. OF ALL WEATHER ROAD IN FESTIVAL DURGAPUJA, EID AND RAINY SEASON AT SANSAD (I TO XII) |
300000 |
REP. OF ALL WEATHER ROAD IN FESTIVAL DURGAPUJA, EID AND RAINY SEASON AT SANSAD (I TO XII)1 |
Completion of work |
-
latitude : 24.4396848,24.4396848
Longitude : 87.8638713,87.8638713
file name : Image_28072021165838766.png
|
2021-07-28 16:58:38.892711 |
231 |
34333513 |
REP. OF ALL WEATHER ROAD IN FESTIVAL DURGAPUJA, EID AND RAINY SEASON AT SANSAD (I TO XII) |
300000 |
REP. OF ALL WEATHER ROAD IN FESTIVAL DURGAPUJA, EID AND RAINY SEASON AT SANSAD (I TO XII)1 |
Completion of work |
-
latitude : 24.4396848,24.4396848
Longitude : 87.8638713,87.8638713
file name : Image_28072021165917087.png
|
2021-07-28 16:59:17.211647 |
232 |
34333513 |
REP. OF ALL WEATHER ROAD IN FESTIVAL DURGAPUJA, EID AND RAINY SEASON AT SANSAD (I TO XII) |
300000 |
REP. OF ALL WEATHER ROAD IN FESTIVAL DURGAPUJA, EID AND RAINY SEASON AT SANSAD (I TO XII)1 |
Completion of work |
-
latitude : 24.4396848,24.4396848
Longitude : 87.8638713,87.8638713
file name : Image_28072021170000327.png
|
2021-07-28 17:00:00.440702 |
233 |
34333954 |
MAINTANENCE OF STREET LIGNHTS AT VARIOUS LOCATIONS UNDER MURARAI G.P. |
99000 |
MAINTANENCE OF STREET LIGNHTS AT VARIOUS LOCATIONS UNDER MURARAI G.P.1 |
Plinth level |
-
latitude : 24.440289
Longitude : 87.8563193
file name : Image_25062021114613818.png
|
2021-06-25 11:46:13.940162 |
234 |
34333954 |
MAINTANENCE OF STREET LIGNHTS AT VARIOUS LOCATIONS UNDER MURARAI G.P. |
99000 |
MAINTANENCE OF STREET LIGNHTS AT VARIOUS LOCATIONS UNDER MURARAI G.P.1 |
Plinth level |
-
latitude : 24.440289
Longitude : 87.8563193
file name : Image_25062021114618904.png
|
2021-06-25 11:46:19.023125 |
235 |
34333954 |
MAINTANENCE OF STREET LIGNHTS AT VARIOUS LOCATIONS UNDER MURARAI G.P. |
99000 |
MAINTANENCE OF STREET LIGNHTS AT VARIOUS LOCATIONS UNDER MURARAI G.P.10 |
Completion of work |
-
latitude : 24.4402847
Longitude : 87.8563267
file name : Image_25062021114610083.png
|
2021-06-25 11:46:10.189858 |
236 |
47159582 |
CONST OF ROAD PROTECTION WALL BY BOULDER MASONRY AT PURA PUKUR AT GOPALPUR |
130000 |
CONST OF ROAD PROTECTION WALL BY BOULDER MASONRY AT PURA PUKUR AT GOPALPUR1 |
Completion of work |
-
latitude : 24.434275000000003
Longitude : 87.87643666666666
file name : Image_19022022141237881.png
|
2022-02-19 14:12:37.971504 |
237 |
47159582 |
CONST OF ROAD PROTECTION WALL BY BOULDER MASONRY AT PURA PUKUR AT GOPALPUR |
130000 |
CONST OF ROAD PROTECTION WALL BY BOULDER MASONRY AT PURA PUKUR AT GOPALPUR1 |
Completion of work |
-
latitude : 24.434258333333332
Longitude : 87.87644333333334
file name : Image_19022022141137654.png
|
2022-02-19 14:11:37.752531 |
238 |
47159582 |
CONST OF ROAD PROTECTION WALL BY BOULDER MASONRY AT PURA PUKUR AT GOPALPUR |
130000 |
CONST OF ROAD PROTECTION WALL BY BOULDER MASONRY AT PURA PUKUR AT GOPALPUR1 |
Completion of work |
-
latitude : 24.4402523
Longitude : 87.8563902
file name : Image_11022022145825667.png
|
2022-02-11 14:58:25.807857 |
239 |
47159582 |
CONST OF ROAD PROTECTION WALL BY BOULDER MASONRY AT PURA PUKUR AT GOPALPUR |
130000 |
CONST OF ROAD PROTECTION WALL BY BOULDER MASONRY AT PURA PUKUR AT GOPALPUR1 |
Completion of work |
-
latitude : 24.4402523
Longitude : 87.8563902
file name : Image_11022022145914215.png
|
2022-02-11 14:59:14.31474 |
240 |
47116588 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM RESINKING TUBEWELL AT DHITORA KAHAR PARA N P |
99000 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM RESINKING TUBEWELL AT DHITORA KAHAR PARA N P |
Completion of work |
-
latitude : 24.4402636
Longitude : 87.8564006
file name : Image_10032022124545201.png
|
2022-03-10 12:45:45.342757 |
241 |
47116588 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM RESINKING TUBEWELL AT DHITORA KAHAR PARA N P |
99000 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM RESINKING TUBEWELL AT DHITORA KAHAR PARA N P |
Completion of work |
-
latitude : 24.4402636
Longitude : 87.8564005
file name : Image_10032022124625929.png
|
2022-03-10 12:46:26.028086 |
242 |
47116588 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM RESINKING TUBEWELL AT DHITORA KAHAR PARA N P |
99000 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM RESINKING TUBEWELL AT DHITORA KAHAR PARA N P |
Completion of work |
-
latitude : 24.4402641
Longitude : 87.8563997
file name : Image_10032022124702414.png
|
2022-03-10 12:47:02.510353 |
243 |
39079151 |
INSTALLATION OF SOLAR SUBMARSIBLE PUMP WITH PIPE LINE NEAR MOJAMMEL HAQUE HOUSE (DOMA |
445000 |
INSTALLATION OF SOLAR SUBMARSIBLE PUMP WITH PIPE LINE NEAR MOJAMMEL HAQUE HOUSE (DOMA1 |
Completion of work |
-
latitude : 24.4382621
Longitude : 87.86440975
file name : Image_10062021122510306.png
|
2021-06-10 12:25:10.397144 |
244 |
39079151 |
INSTALLATION OF SOLAR SUBMARSIBLE PUMP WITH PIPE LINE NEAR MOJAMMEL HAQUE HOUSE (DOMA |
445000 |
INSTALLATION OF SOLAR SUBMARSIBLE PUMP WITH PIPE LINE NEAR MOJAMMEL HAQUE HOUSE (DOMA1 |
Completion of work |
-
latitude : 24.4382621
Longitude : 87.86440975
file name : Image_10062021122502841.png
|
2021-06-10 12:25:02.932716 |
245 |
39079151 |
INSTALLATION OF SOLAR SUBMARSIBLE PUMP WITH PIPE LINE NEAR MOJAMMEL HAQUE HOUSE (DOMA |
445000 |
INSTALLATION OF SOLAR SUBMARSIBLE PUMP WITH PIPE LINE NEAR MOJAMMEL HAQUE HOUSE (DOMA1 |
Completion of work |
-
latitude : 24.43823467
Longitude : 87.86445749
file name : Image_10062021122457198.png
|
2021-06-10 12:24:57.300016 |
246 |
39079151 |
INSTALLATION OF SOLAR SUBMARSIBLE PUMP WITH PIPE LINE NEAR MOJAMMEL HAQUE HOUSE (DOMA |
445000 |
INSTALLATION OF SOLAR SUBMARSIBLE PUMP WITH PIPE LINE NEAR MOJAMMEL HAQUE HOUSE (DOMA1 |
Completion of work |
-
latitude : 24.43822779
Longitude : 87.86450006
file name : Image_15032021152035889.png
|
2021-03-15 15:20:35.989218 |
247 |
39079151 |
INSTALLATION OF SOLAR SUBMARSIBLE PUMP WITH PIPE LINE NEAR MOJAMMEL HAQUE HOUSE (DOMA |
445000 |
INSTALLATION OF SOLAR SUBMARSIBLE PUMP WITH PIPE LINE NEAR MOJAMMEL HAQUE HOUSE (DOMA1 |
Completion of work |
-
latitude : 24.43822779
Longitude : 87.86450006
file name : Image_15032021122203112.png
|
2021-03-15 12:22:03.217061 |
248 |
39079151 |
INSTALLATION OF SOLAR SUBMARSIBLE PUMP WITH PIPE LINE NEAR MOJAMMEL HAQUE HOUSE (DOMA |
445000 |
INSTALLATION OF SOLAR SUBMARSIBLE PUMP WITH PIPE LINE NEAR MOJAMMEL HAQUE HOUSE (DOMA1 |
Completion of work |
-
latitude : 24.43822547
Longitude : 87.86450313
file name : Image_15032021122114111.png
|
2021-03-15 12:21:14.206632 |
249 |
39079807 |
CONSTRUCTION OF PCC ROAD FROM NAYEB RASUL HOUSE TO JAMAL SK HOUSE AT GHUSKIRA |
90000 |
CONSTRUCTION OF PCC ROAD FROM NAYEB RASUL HOUSE TO JAMAL SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41649462,24.41624725
Longitude : 87.85659153,87.85706846
file name : Image_17082021135818458.png
|
2021-08-17 13:58:18.582761 |
250 |
39079807 |
CONSTRUCTION OF PCC ROAD FROM NAYEB RASUL HOUSE TO JAMAL SK HOUSE AT GHUSKIRA |
90000 |
CONSTRUCTION OF PCC ROAD FROM NAYEB RASUL HOUSE TO JAMAL SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41610416,24.41643628
Longitude : 87.85704595,87.8570076
file name : Image_17082021140012117.png
|
2021-08-17 14:00:12.229103 |
251 |
39079807 |
CONSTRUCTION OF PCC ROAD FROM NAYEB RASUL HOUSE TO JAMAL SK HOUSE AT GHUSKIRA |
90000 |
CONSTRUCTION OF PCC ROAD FROM NAYEB RASUL HOUSE TO JAMAL SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.4161315,24.41619184
Longitude : 87.85704253,87.8570437
file name : Image_10082021112350767.png
|
2021-08-10 11:23:50.869309 |
252 |
34515316 |
UPGRADATION OF PCC ROAD FROM FAIJUL SK HOUSE TO PIRU SK HOUSE AT GHUSKIRA |
101340 |
UPGRADATION OF PCC ROAD FROM FAIJUL SK HOUSE TO PIRU SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.42132427,24.4213083
Longitude : 87.8584006,87.85839085
file name : Image_27092021132956354.png
|
2021-09-27 13:29:56.455434 |
253 |
34515316 |
UPGRADATION OF PCC ROAD FROM FAIJUL SK HOUSE TO PIRU SK HOUSE AT GHUSKIRA |
101340 |
UPGRADATION OF PCC ROAD FROM FAIJUL SK HOUSE TO PIRU SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.42171201,24.42169312
Longitude : 87.85855334,87.85854524
file name : Image_27092021132640716.png
|
2021-09-27 13:26:40.816846 |
254 |
34366020 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO ROFIK SK HOUSE AT PANIARA |
100000 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO ROFIK SK HOUSE AT PANIARA1 |
Completion of work |
-
latitude : 24.43620333333333,24.43621
Longitude : 87.84549999999999,87.84540833333334
file name : Image_11012022124659184.png
|
2022-01-11 12:46:59.393374 |
255 |
34366020 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO ROFIK SK HOUSE AT PANIARA |
100000 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO ROFIK SK HOUSE AT PANIARA1 |
Completion of work |
-
latitude : 24.43617,24.43619833333333
Longitude : 87.84544666666667,87.84543666666666
file name : Image_11012022124616598.png
|
2022-01-11 12:46:16.738498 |
256 |
34366020 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO ROFIK SK HOUSE AT PANIARA |
100000 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO ROFIK SK HOUSE AT PANIARA1 |
Completion of work |
-
latitude : 24.436182898227557,24.436182898227557
Longitude : 87.84543479834716,87.84543479834716
file name : Image_04102021134148959.png
|
2021-10-04 13:41:49.06064 |
257 |
39080066 |
INSTALLATION OF SOLAR LIGHTS : NEAR- 1)BABLU HOUSE, 2)JUMMA MASJID, 3) PANSU SK HOUSE |
100000 |
INSTALLATION OF SOLAR LIGHTS : NEAR- 1)BABLU HOUSE, 2)JUMMA MASJID, 3) PANSU SK HOUSE1 |
Completion of work |
-
latitude : 24.440501
Longitude : 87.84455201
file name : Image_08092021134404995.png
|
2021-09-08 13:44:05.093383 |
258 |
39080066 |
INSTALLATION OF SOLAR LIGHTS : NEAR- 1)BABLU HOUSE, 2)JUMMA MASJID, 3) PANSU SK HOUSE |
100000 |
INSTALLATION OF SOLAR LIGHTS : NEAR- 1)BABLU HOUSE, 2)JUMMA MASJID, 3) PANSU SK HOUSE1 |
Completion of work |
-
latitude : 24.44057176
Longitude : 87.84516872
file name : Image_08092021134312014.png
|
2021-09-08 13:43:12.10242 |
259 |
39080066 |
INSTALLATION OF SOLAR LIGHTS : NEAR- 1)BABLU HOUSE, 2)JUMMA MASJID, 3) PANSU SK HOUSE |
100000 |
INSTALLATION OF SOLAR LIGHTS : NEAR- 1)BABLU HOUSE, 2)JUMMA MASJID, 3) PANSU SK HOUSE1 |
Completion of work |
-
latitude : 24.4422398
Longitude : 87.8514146
file name : Image_08092021134049001.png
|
2021-09-08 13:40:49.087246 |
260 |
34794043 |
INSTALLATION OF SOLAR LIGHTS: NEAR- 1) FULU MAL HOUSE, 2)SAMBUJ MAL HOUSE, 3)CULVERT, 4)SISIR MA |
200000 |
INSTALLATION OF SOLAR LIGHTS: NEAR- 1) FULU MAL HOUSE, 2)SAMBUJ MAL HOUSE, 3)CULVERT, 4)SISIR MA1 |
Completion of work |
-
latitude : 24.4252355
Longitude : 87.8615499
file name : Image_21092021170635204.png
|
2021-09-21 17:06:35.278999 |
261 |
34794043 |
INSTALLATION OF SOLAR LIGHTS: NEAR- 1) FULU MAL HOUSE, 2)SAMBUJ MAL HOUSE, 3)CULVERT, 4)SISIR MA |
200000 |
INSTALLATION OF SOLAR LIGHTS: NEAR- 1) FULU MAL HOUSE, 2)SAMBUJ MAL HOUSE, 3)CULVERT, 4)SISIR MA1 |
Completion of work |
-
latitude : 24.4252355
Longitude : 87.8615499
file name : Image_21092021170642683.png
|
2021-09-21 17:06:42.756478 |
262 |
34794043 |
INSTALLATION OF SOLAR LIGHTS: NEAR- 1) FULU MAL HOUSE, 2)SAMBUJ MAL HOUSE, 3)CULVERT, 4)SISIR MA |
200000 |
INSTALLATION OF SOLAR LIGHTS: NEAR- 1) FULU MAL HOUSE, 2)SAMBUJ MAL HOUSE, 3)CULVERT, 4)SISIR MA1 |
Completion of work |
-
latitude : 24.4252355
Longitude : 87.8615499
file name : Image_21092021170628093.png
|
2021-09-21 17:06:28.168669 |
263 |
34794043 |
INSTALLATION OF SOLAR LIGHTS: NEAR- 1) FULU MAL HOUSE, 2)SAMBUJ MAL HOUSE, 3)CULVERT, 4)SISIR MA |
200000 |
INSTALLATION OF SOLAR LIGHTS: NEAR- 1) FULU MAL HOUSE, 2)SAMBUJ MAL HOUSE, 3)CULVERT, 4)SISIR MA1 |
Completion of work |
-
latitude : 24.4252355
Longitude : 87.8615499
file name : Image_21092021170653055.png
|
2021-09-21 17:06:53.128754 |
264 |
34794043 |
INSTALLATION OF SOLAR LIGHTS: NEAR- 1) FULU MAL HOUSE, 2)SAMBUJ MAL HOUSE, 3)CULVERT, 4)SISIR MA |
200000 |
INSTALLATION OF SOLAR LIGHTS: NEAR- 1) FULU MAL HOUSE, 2)SAMBUJ MAL HOUSE, 3)CULVERT, 4)SISIR MA1 |
Completion of work |
-
latitude : 24.4252355
Longitude : 87.8615499
file name : Image_21092021170659234.png
|
2021-09-21 17:06:59.307207 |
265 |
34794043 |
INSTALLATION OF SOLAR LIGHTS: NEAR- 1) FULU MAL HOUSE, 2)SAMBUJ MAL HOUSE, 3)CULVERT, 4)SISIR MA |
200000 |
INSTALLATION OF SOLAR LIGHTS: NEAR- 1) FULU MAL HOUSE, 2)SAMBUJ MAL HOUSE, 3)CULVERT, 4)SISIR MA1 |
Completion of work |
-
latitude : 24.4252355
Longitude : 87.8615499
file name : Image_21092021134648744.png
|
2021-09-21 13:46:48.861356 |
266 |
34794043 |
INSTALLATION OF SOLAR LIGHTS: NEAR- 1) FULU MAL HOUSE, 2)SAMBUJ MAL HOUSE, 3)CULVERT, 4)SISIR MA |
200000 |
INSTALLATION OF SOLAR LIGHTS: NEAR- 1) FULU MAL HOUSE, 2)SAMBUJ MAL HOUSE, 3)CULVERT, 4)SISIR MA1 |
Completion of work |
-
latitude : 24.4252355
Longitude : 87.8615499
file name : Image_21092021134842031.png
|
2021-09-21 13:48:42.123749 |
267 |
34514256 |
INSTALLATION OF SOLAR LIGHT: NEAR -1)GHUSKIRA MUKHAGNI, 2)ANDO MAL HOUSE, 3)GHUSKIRA SOSTITALA |
200000 |
INSTALLATION OF SOLAR LIGHT: NEAR -1)GHUSKIRA MUKHAGNI, 2)ANDO MAL HOUSE, 3)GHUSKIRA SOSTITALA1 |
Completion of work |
-
latitude : 24.41921228
Longitude : 87.85384963
file name : Image_13082021110313845.png
|
2021-08-13 11:03:13.947435 |
268 |
34514256 |
INSTALLATION OF SOLAR LIGHT: NEAR -1)GHUSKIRA MUKHAGNI, 2)ANDO MAL HOUSE, 3)GHUSKIRA SOSTITALA |
200000 |
INSTALLATION OF SOLAR LIGHT: NEAR -1)GHUSKIRA MUKHAGNI, 2)ANDO MAL HOUSE, 3)GHUSKIRA SOSTITALA1 |
Completion of work |
-
latitude : 24.4184734
Longitude : 87.8536736
file name : Image_11082021113713138.png
|
2021-08-11 11:37:13.236022 |
269 |
34514256 |
INSTALLATION OF SOLAR LIGHT: NEAR -1)GHUSKIRA MUKHAGNI, 2)ANDO MAL HOUSE, 3)GHUSKIRA SOSTITALA |
200000 |
INSTALLATION OF SOLAR LIGHT: NEAR -1)GHUSKIRA MUKHAGNI, 2)ANDO MAL HOUSE, 3)GHUSKIRA SOSTITALA1 |
Completion of work |
-
latitude : 24.4184722
Longitude : 87.8536753
file name : Image_11082021114731368.png
|
2021-08-11 11:47:31.485087 |
270 |
34514256 |
INSTALLATION OF SOLAR LIGHT: NEAR -1)GHUSKIRA MUKHAGNI, 2)ANDO MAL HOUSE, 3)GHUSKIRA SOSTITALA |
200000 |
INSTALLATION OF SOLAR LIGHT: NEAR -1)GHUSKIRA MUKHAGNI, 2)ANDO MAL HOUSE, 3)GHUSKIRA SOSTITALA1 |
Completion of work |
-
latitude : 24.4184734
Longitude : 87.8536736
file name : Image_11082021114216636.png
|
2021-08-11 11:42:16.738284 |
271 |
34501711 |
INSTALLATION OF SOLAR LIGHT: NEAR -1)SATSANGA ANUKUL THAKUR, 2)JAHAR SK HOUSE, 3)DILIP DAS HO |
150000 |
INSTALLATION OF SOLAR LIGHT: NEAR -1)SATSANGA ANUKUL THAKUR, 2)JAHAR SK HOUSE, 3)DILIP DAS HO1 |
Completion of work |
-
latitude : 24.4387985
Longitude : 87.8611608
file name : Image_27082021165959635.png
|
2021-08-27 16:59:59.757065 |
272 |
34501711 |
INSTALLATION OF SOLAR LIGHT: NEAR -1)SATSANGA ANUKUL THAKUR, 2)JAHAR SK HOUSE, 3)DILIP DAS HO |
150000 |
INSTALLATION OF SOLAR LIGHT: NEAR -1)SATSANGA ANUKUL THAKUR, 2)JAHAR SK HOUSE, 3)DILIP DAS HO1 |
Completion of work |
-
latitude : 24.4387985
Longitude : 87.8611608
file name : Image_27082021170459484.png
|
2021-08-27 17:04:59.629919 |
273 |
34787888 |
UPGRADATION OF PUCCA DRAIN FROM NURJAHAN HOUSE TO MABUL SK HOUSE AT GHUSKIRA |
99500 |
UPGRADATION OF PUCCA DRAIN FROM NURJAHAN HOUSE TO MABUL SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41815783,24.41813906
Longitude : 87.85641453,87.85650139
file name : Image_13092021145234339.png
|
2021-09-13 14:52:34.422805 |
274 |
34787888 |
UPGRADATION OF PUCCA DRAIN FROM NURJAHAN HOUSE TO MABUL SK HOUSE AT GHUSKIRA |
99500 |
UPGRADATION OF PUCCA DRAIN FROM NURJAHAN HOUSE TO MABUL SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41796911,24.41813738
Longitude : 87.85667929,87.85643754
file name : Image_13092021145505646.png
|
2021-09-13 14:55:05.740704 |
275 |
34787888 |
UPGRADATION OF PUCCA DRAIN FROM NURJAHAN HOUSE TO MABUL SK HOUSE AT GHUSKIRA |
99500 |
UPGRADATION OF PUCCA DRAIN FROM NURJAHAN HOUSE TO MABUL SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41810794,24.41799294
Longitude : 87.85656793,87.85667278
file name : Image_13092021145322863.png
|
2021-09-13 14:53:22.952874 |
276 |
34497859 |
UPGRADATION OF PCC ROAD FROM PCC ROAD TO FAIZ SK HOUSE AT BHADISWAR |
80818 |
UPGRADATION OF PCC ROAD FROM PCC ROAD TO FAIZ SK HOUSE AT BHADISWAR1 |
Plinth level |
-
latitude : 24.4427859,24.4427859
Longitude : 87.8608691,87.8608691
file name : Image_08012021152523806.png
|
2021-01-08 15:25:23.898692 |
277 |
34497859 |
UPGRADATION OF PCC ROAD FROM PCC ROAD TO FAIZ SK HOUSE AT BHADISWAR |
80818 |
UPGRADATION OF PCC ROAD FROM PCC ROAD TO FAIZ SK HOUSE AT BHADISWAR1 |
Plinth level |
-
latitude : 24.4427859,24.44303612
Longitude : 87.8608691,87.86071437
file name : Image_08012021151419364.png
|
2021-01-08 15:14:19.457491 |
278 |
34497859 |
UPGRADATION OF PCC ROAD FROM PCC ROAD TO FAIZ SK HOUSE AT BHADISWAR |
80818 |
UPGRADATION OF PCC ROAD FROM PCC ROAD TO FAIZ SK HOUSE AT BHADISWAR1 |
Completion of work |
-
latitude : 24.43569462,24.43570881
Longitude : 87.86508816,87.8651019
file name : Image_19122020115343025.png
|
2020-12-19 11:53:43.130948 |
279 |
34496128 |
INSTALLATION OF SOLAR LIGHTS: NEAR -1)MUN SHARMA HOUSE, 2)MONOSA MANDIR, 3)SOSHTI TALA, |
200000 |
INSTALLATION OF SOLAR LIGHTS: NEAR -1)MUN SHARMA HOUSE, 2)MONOSA MANDIR, 3)SOSHTI TALA,1 |
Completion of work |
-
latitude : 24.44162356
Longitude : 87.86122452
file name : Image_29092021121017288.png
|
2021-09-29 12:10:17.37081 |
280 |
34496128 |
INSTALLATION OF SOLAR LIGHTS: NEAR -1)MUN SHARMA HOUSE, 2)MONOSA MANDIR, 3)SOSHTI TALA, |
200000 |
INSTALLATION OF SOLAR LIGHTS: NEAR -1)MUN SHARMA HOUSE, 2)MONOSA MANDIR, 3)SOSHTI TALA,1 |
Completion of work |
-
latitude : 24.44229605
Longitude : 87.8610742
file name : Image_24092021114539353.png
|
2021-09-24 11:45:39.455204 |
281 |
34496128 |
INSTALLATION OF SOLAR LIGHTS: NEAR -1)MUN SHARMA HOUSE, 2)MONOSA MANDIR, 3)SOSHTI TALA, |
200000 |
INSTALLATION OF SOLAR LIGHTS: NEAR -1)MUN SHARMA HOUSE, 2)MONOSA MANDIR, 3)SOSHTI TALA,1 |
Completion of work |
-
latitude : 24.4428209
Longitude : 87.8609733
file name : Image_24092021115557700.png
|
2021-09-24 11:55:57.814039 |
282 |
34496128 |
INSTALLATION OF SOLAR LIGHTS: NEAR -1)MUN SHARMA HOUSE, 2)MONOSA MANDIR, 3)SOSHTI TALA, |
200000 |
INSTALLATION OF SOLAR LIGHTS: NEAR -1)MUN SHARMA HOUSE, 2)MONOSA MANDIR, 3)SOSHTI TALA,1 |
Completion of work |
-
latitude : 24.4400777
Longitude : 87.8584459
file name : Image_24092021120032098.png
|
2021-09-24 12:00:32.213649 |
283 |
39078712 |
INSTALLATION OF SOLAR LIGHT -NEAR 1)ROBIDADA HOUSE, 2)RAKES MISTI SHOP, 3)HIGH SCHOOL CHHOTO |
200000 |
INSTALLATION OF SOLAR LIGHT -NEAR 1)ROBIDADA HOUSE, 2)RAKES MISTI SHOP, 3)HIGH SCHOOL CHHOTO1 |
Completion of work |
-
latitude : 24.4405298
Longitude : 87.8566792
file name : Image_19082021150842694.png
|
2021-08-19 15:08:42.803647 |
284 |
39078712 |
INSTALLATION OF SOLAR LIGHT -NEAR 1)ROBIDADA HOUSE, 2)RAKES MISTI SHOP, 3)HIGH SCHOOL CHHOTO |
200000 |
INSTALLATION OF SOLAR LIGHT -NEAR 1)ROBIDADA HOUSE, 2)RAKES MISTI SHOP, 3)HIGH SCHOOL CHHOTO1 |
Completion of work |
-
latitude : 24.4416304
Longitude : 87.8564503
file name : Image_19082021151057110.png
|
2021-08-19 15:10:57.214251 |
285 |
39078712 |
INSTALLATION OF SOLAR LIGHT -NEAR 1)ROBIDADA HOUSE, 2)RAKES MISTI SHOP, 3)HIGH SCHOOL CHHOTO |
200000 |
INSTALLATION OF SOLAR LIGHT -NEAR 1)ROBIDADA HOUSE, 2)RAKES MISTI SHOP, 3)HIGH SCHOOL CHHOTO1 |
Completion of work |
-
latitude : 24.4416322
Longitude : 87.8564502
file name : Image_19082021151204088.png
|
2021-08-19 15:12:04.176583 |
286 |
39078712 |
INSTALLATION OF SOLAR LIGHT -NEAR 1)ROBIDADA HOUSE, 2)RAKES MISTI SHOP, 3)HIGH SCHOOL CHHOTO |
200000 |
INSTALLATION OF SOLAR LIGHT -NEAR 1)ROBIDADA HOUSE, 2)RAKES MISTI SHOP, 3)HIGH SCHOOL CHHOTO1 |
Completion of work |
-
latitude : 24.4401509
Longitude : 87.8573582
file name : Image_19082021151544015.png
|
2021-08-19 15:15:44.12789 |
287 |
34475804 |
INSTALLATION OF SOLAR LIGHT: NEAR- 1)SIPUL SK HOUSE, 2)MONIR SK HOUSE(JALIBAGAN), 3)MENTU SK HOUSE, |
100000 |
INSTALLATION OF SOLAR LIGHT: NEAR- 1)SIPUL SK HOUSE, 2)MONIR SK HOUSE(JALIBAGAN), 3)MENTU SK HOUSE,1 |
Completion of work |
-
latitude : 24.4454461
Longitude : 87.8533855
file name : Image_20092021125014548.png
|
2021-09-20 12:50:14.664445 |
288 |
34475804 |
INSTALLATION OF SOLAR LIGHT: NEAR- 1)SIPUL SK HOUSE, 2)MONIR SK HOUSE(JALIBAGAN), 3)MENTU SK HOUSE, |
100000 |
INSTALLATION OF SOLAR LIGHT: NEAR- 1)SIPUL SK HOUSE, 2)MONIR SK HOUSE(JALIBAGAN), 3)MENTU SK HOUSE,1 |
Completion of work |
-
latitude : 24.4454401
Longitude : 87.8533928
file name : Image_20092021125641655.png
|
2021-09-20 12:56:41.766878 |
289 |
34475804 |
INSTALLATION OF SOLAR LIGHT: NEAR- 1)SIPUL SK HOUSE, 2)MONIR SK HOUSE(JALIBAGAN), 3)MENTU SK HOUSE, |
100000 |
INSTALLATION OF SOLAR LIGHT: NEAR- 1)SIPUL SK HOUSE, 2)MONIR SK HOUSE(JALIBAGAN), 3)MENTU SK HOUSE,1 |
Completion of work |
-
latitude : 24.4454401
Longitude : 87.8533928
file name : Image_20092021125645613.png
|
2021-09-20 12:56:45.73946 |
290 |
34345104 |
INSTALLATION OF SOLAR LIGHTS : (NEAR - 1)SADHIN MAHAR HOUSE, 2)SANU MAHARA HOUSE, |
200000 |
INSTALLATION OF SOLAR LIGHTS : (NEAR - 1)SADHIN MAHAR HOUSE, 2)SANU MAHARA HOUSE,1 |
Completion of work |
-
latitude : 24.4402592
Longitude : 87.8563206
file name : Image_17112021121706982.png
|
2021-11-17 12:17:07.105144 |
291 |
34345104 |
INSTALLATION OF SOLAR LIGHTS : (NEAR - 1)SADHIN MAHAR HOUSE, 2)SANU MAHARA HOUSE, |
200000 |
INSTALLATION OF SOLAR LIGHTS : (NEAR - 1)SADHIN MAHAR HOUSE, 2)SANU MAHARA HOUSE,1 |
Completion of work |
-
latitude : 24.4402592
Longitude : 87.8563206
file name : Image_17112021121710255.png
|
2021-11-17 12:17:10.391108 |
292 |
34345104 |
INSTALLATION OF SOLAR LIGHTS : (NEAR - 1)SADHIN MAHAR HOUSE, 2)SANU MAHARA HOUSE, |
200000 |
INSTALLATION OF SOLAR LIGHTS : (NEAR - 1)SADHIN MAHAR HOUSE, 2)SANU MAHARA HOUSE,1 |
Completion of work |
-
latitude : 24.4402592
Longitude : 87.8563206
file name : Image_09112021141641111.png
|
2021-11-09 14:16:41.25366 |
293 |
34345888 |
UPGRADATION OF PUCCA DRAIN FROM LIAKOT SK HOUSE TO AJIJUL SK HOUSE AT DHITORA |
100000 |
UPGRADATION OF PUCCA DRAIN FROM LIAKOT SK HOUSE TO AJIJUL SK HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.45769832,24.45772565
Longitude : 87.84946119,87.8494778
file name : Image_19012021130012385.png
|
2021-01-19 13:00:12.492236 |
294 |
34345888 |
UPGRADATION OF PUCCA DRAIN FROM LIAKOT SK HOUSE TO AJIJUL SK HOUSE AT DHITORA |
100000 |
UPGRADATION OF PUCCA DRAIN FROM LIAKOT SK HOUSE TO AJIJUL SK HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.45774632,24.45772788
Longitude : 87.8493452,87.84938699
file name : Image_19012021125918954.png
|
2021-01-19 12:59:19.062871 |
295 |
34345888 |
UPGRADATION OF PUCCA DRAIN FROM LIAKOT SK HOUSE TO AJIJUL SK HOUSE AT DHITORA |
100000 |
UPGRADATION OF PUCCA DRAIN FROM LIAKOT SK HOUSE TO AJIJUL SK HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.45783102,24.4578251
Longitude : 87.84917806,87.84921418
file name : Image_19012021125754959.png
|
2021-01-19 12:57:55.072206 |
296 |
34344228 |
INSTALLATION OF SOLAR LIGHTS NEAR: 1)JAMALUDDIN SHOP, 2)JESAN SHOP, 3)ABDUL ODUD HOUSE, |
200000 |
INSTALLATION OF SOLAR LIGHTS NEAR: 1)JAMALUDDIN SHOP, 2)JESAN SHOP, 3)ABDUL ODUD HOUSE,1 |
Completion of work |
-
latitude : 24.4541626
Longitude : 87.8481703
file name : Image_24082021112401650.png
|
2021-08-24 11:24:01.75185 |
297 |
34344228 |
INSTALLATION OF SOLAR LIGHTS NEAR: 1)JAMALUDDIN SHOP, 2)JESAN SHOP, 3)ABDUL ODUD HOUSE, |
200000 |
INSTALLATION OF SOLAR LIGHTS NEAR: 1)JAMALUDDIN SHOP, 2)JESAN SHOP, 3)ABDUL ODUD HOUSE,1 |
Completion of work |
-
latitude : 24.4541626
Longitude : 87.8481703
file name : Image_24082021112838749.png
|
2021-08-24 11:28:38.854699 |
298 |
34344228 |
INSTALLATION OF SOLAR LIGHTS NEAR: 1)JAMALUDDIN SHOP, 2)JESAN SHOP, 3)ABDUL ODUD HOUSE, |
200000 |
INSTALLATION OF SOLAR LIGHTS NEAR: 1)JAMALUDDIN SHOP, 2)JESAN SHOP, 3)ABDUL ODUD HOUSE,1 |
Completion of work |
-
latitude : 24.4541626
Longitude : 87.8481703
file name : Image_24082021112603204.png
|
2021-08-24 11:26:03.308592 |
299 |
34344228 |
INSTALLATION OF SOLAR LIGHTS NEAR: 1)JAMALUDDIN SHOP, 2)JESAN SHOP, 3)ABDUL ODUD HOUSE, |
200000 |
INSTALLATION OF SOLAR LIGHTS NEAR: 1)JAMALUDDIN SHOP, 2)JESAN SHOP, 3)ABDUL ODUD HOUSE,1 |
Completion of work |
-
latitude : 24.4541626
Longitude : 87.8481703
file name : Image_24082021113044331.png
|
2021-08-24 11:30:44.421608 |
300 |
34344228 |
INSTALLATION OF SOLAR LIGHTS NEAR: 1)JAMALUDDIN SHOP, 2)JESAN SHOP, 3)ABDUL ODUD HOUSE, |
200000 |
INSTALLATION OF SOLAR LIGHTS NEAR: 1)JAMALUDDIN SHOP, 2)JESAN SHOP, 3)ABDUL ODUD HOUSE,1 |
Completion of work |
-
latitude : 24.4541626
Longitude : 87.8481703
file name : Image_24082021113427966.png
|
2021-08-24 11:34:28.086159 |
301 |
34344228 |
INSTALLATION OF SOLAR LIGHTS NEAR: 1)JAMALUDDIN SHOP, 2)JESAN SHOP, 3)ABDUL ODUD HOUSE, |
200000 |
INSTALLATION OF SOLAR LIGHTS NEAR: 1)JAMALUDDIN SHOP, 2)JESAN SHOP, 3)ABDUL ODUD HOUSE,1 |
Completion of work |
-
latitude : 24.4541626
Longitude : 87.8481703
file name : Image_24082021113622656.png
|
2021-08-24 11:36:22.779408 |
302 |
34344228 |
INSTALLATION OF SOLAR LIGHTS NEAR: 1)JAMALUDDIN SHOP, 2)JESAN SHOP, 3)ABDUL ODUD HOUSE, |
200000 |
INSTALLATION OF SOLAR LIGHTS NEAR: 1)JAMALUDDIN SHOP, 2)JESAN SHOP, 3)ABDUL ODUD HOUSE,1 |
Completion of work |
-
latitude : 24.4541626
Longitude : 87.8481703
file name : Image_24082021113827693.png
|
2021-08-24 11:38:27.800076 |
303 |
34344228 |
INSTALLATION OF SOLAR LIGHTS NEAR: 1)JAMALUDDIN SHOP, 2)JESAN SHOP, 3)ABDUL ODUD HOUSE, |
200000 |
INSTALLATION OF SOLAR LIGHTS NEAR: 1)JAMALUDDIN SHOP, 2)JESAN SHOP, 3)ABDUL ODUD HOUSE,1 |
Completion of work |
-
latitude : 24.4541626
Longitude : 87.8481703
file name : Image_24082021114007878.png
|
2021-08-24 11:40:07.992072 |
304 |
39079952 |
CONSTRUCTION OF PUCCA DRAIN FROM PROBODH KONAI HOUSE TO SOCIETY AT KESTARA |
141516 |
CONSTRUCTION OF PUCCA DRAIN FROM PROBODH KONAI HOUSE TO SOCIETY AT KESTARA1 |
Completion of work |
-
latitude : 24.42252753,24.42250602
Longitude : 87.86590205,87.8659208
file name : Image_27012021134004980.png
|
2021-01-27 13:40:05.099456 |
305 |
39079952 |
CONSTRUCTION OF PUCCA DRAIN FROM PROBODH KONAI HOUSE TO SOCIETY AT KESTARA |
141516 |
CONSTRUCTION OF PUCCA DRAIN FROM PROBODH KONAI HOUSE TO SOCIETY AT KESTARA1 |
Completion of work |
-
latitude : 24.42246779,24.4224723
Longitude : 87.86601877,87.86603031
file name : Image_27012021134102003.png
|
2021-01-27 13:41:02.107622 |
306 |
39079952 |
CONSTRUCTION OF PUCCA DRAIN FROM PROBODH KONAI HOUSE TO SOCIETY AT KESTARA |
141516 |
CONSTRUCTION OF PUCCA DRAIN FROM PROBODH KONAI HOUSE TO SOCIETY AT KESTARA1 |
Completion of work |
-
latitude : 24.42241536,24.42247187
Longitude : 87.86623546,87.86611921
file name : Image_27012021134240210.png
|
2021-01-27 13:42:40.315845 |
307 |
39080166 |
PURCHASE OF MATERIALS (FENAIL, BLEACHING, DETTOL, LIME ETC) TO PREVENT THE VECTOR BON, DENGUE DEASI |
150000 |
PURCHASE OF MATERIALS (FENAIL, BLEACHING, DETTOL, LIME ETC) TO PREVENT THE VECTOR BON, DENGUE DEASI1 |
Completion of work |
-
latitude : 24.4402078
Longitude : 87.8562901
file name : Image_02092021155441534.png
|
2021-09-02 15:54:41.650421 |
308 |
39080166 |
PURCHASE OF MATERIALS (FENAIL, BLEACHING, DETTOL, LIME ETC) TO PREVENT THE VECTOR BON, DENGUE DEASI |
150000 |
PURCHASE OF MATERIALS (FENAIL, BLEACHING, DETTOL, LIME ETC) TO PREVENT THE VECTOR BON, DENGUE DEASI1 |
Completion of work |
-
latitude : 24.4402078
Longitude : 87.8562901
file name : Image_02092021155437137.png
|
2021-09-02 15:54:37.27322 |
309 |
39080166 |
PURCHASE OF MATERIALS (FENAIL, BLEACHING, DETTOL, LIME ETC) TO PREVENT THE VECTOR BON, DENGUE DEASI |
150000 |
PURCHASE OF MATERIALS (FENAIL, BLEACHING, DETTOL, LIME ETC) TO PREVENT THE VECTOR BON, DENGUE DEASI1 |
Completion of work |
-
latitude : 24.4402393
Longitude : 87.856336
file name : Image_02092021155431749.png
|
2021-09-02 15:54:31.866503 |
310 |
39080166 |
PURCHASE OF MATERIALS (FENAIL, BLEACHING, DETTOL, LIME ETC) TO PREVENT THE VECTOR BON, DENGUE DEASI |
150000 |
PURCHASE OF MATERIALS (FENAIL, BLEACHING, DETTOL, LIME ETC) TO PREVENT THE VECTOR BON, DENGUE DEASI1 |
Completion of work |
-
latitude : 24.4402382
Longitude : 87.8563341
file name : Image_02092021155325035.png
|
2021-09-02 15:53:25.150485 |
311 |
39080166 |
PURCHASE OF MATERIALS (FENAIL, BLEACHING, DETTOL, LIME ETC) TO PREVENT THE VECTOR BON, DENGUE DEASI |
150000 |
PURCHASE OF MATERIALS (FENAIL, BLEACHING, DETTOL, LIME ETC) TO PREVENT THE VECTOR BON, DENGUE DEASI1 |
Completion of work |
-
latitude : 24.4402061
Longitude : 87.8562911
file name : Image_02092021155239841.png
|
2021-09-02 15:52:39.964162 |
312 |
39079052 |
CONSTRUCTION OF PUCCA DRAIN FROM KALU SK HOUSE TO PITCH ROAD AT BHADISWAR |
85000 |
CONSTRUCTION OF PUCCA DRAIN FROM KALU SK HOUSE TO PITCH ROAD AT BHADISWAR1 |
Roof laid |
-
latitude : 24.44000999,24.44000326
Longitude : 87.86308804,87.86309544
file name : Image_04032021132722636.png
|
2021-03-04 13:27:22.736005 |
313 |
39079052 |
CONSTRUCTION OF PUCCA DRAIN FROM KALU SK HOUSE TO PITCH ROAD AT BHADISWAR |
85000 |
CONSTRUCTION OF PUCCA DRAIN FROM KALU SK HOUSE TO PITCH ROAD AT BHADISWAR1 |
Roof laid |
-
latitude : 24.44017851,24.44019494
Longitude : 87.86314542,87.86314989
file name : Image_04032021132729154.png
|
2021-03-04 13:27:29.245555 |
314 |
39079052 |
CONSTRUCTION OF PUCCA DRAIN FROM KALU SK HOUSE TO PITCH ROAD AT BHADISWAR |
85000 |
CONSTRUCTION OF PUCCA DRAIN FROM KALU SK HOUSE TO PITCH ROAD AT BHADISWAR1 |
Roof laid |
-
latitude : 24.44000999,24.44000326
Longitude : 87.86308804,87.86309544
file name : Image_04032021132757281.png
|
2021-03-04 13:27:57.381294 |
315 |
39079052 |
CONSTRUCTION OF PUCCA DRAIN FROM KALU SK HOUSE TO PITCH ROAD AT BHADISWAR |
85000 |
CONSTRUCTION OF PUCCA DRAIN FROM KALU SK HOUSE TO PITCH ROAD AT BHADISWAR1 |
Roof laid |
-
latitude : 24.44017851,24.44019494
Longitude : 87.86314542,87.86314989
file name : Image_04032021132802439.png
|
2021-03-04 13:28:02.529935 |
316 |
39079052 |
CONSTRUCTION OF PUCCA DRAIN FROM KALU SK HOUSE TO PITCH ROAD AT BHADISWAR |
85000 |
CONSTRUCTION OF PUCCA DRAIN FROM KALU SK HOUSE TO PITCH ROAD AT BHADISWAR1 |
Completion of work |
-
latitude : 24.43835666,24.43836149
Longitude : 87.85922767,87.85921606
file name : Image_18022021123746374.png
|
2021-02-18 12:37:46.464595 |
317 |
39079052 |
CONSTRUCTION OF PUCCA DRAIN FROM KALU SK HOUSE TO PITCH ROAD AT BHADISWAR |
85000 |
CONSTRUCTION OF PUCCA DRAIN FROM KALU SK HOUSE TO PITCH ROAD AT BHADISWAR1 |
Completion of work |
-
latitude : 24.44003452,24.44004365
Longitude : 87.86310655,87.86308455
file name : Image_21012021123321022.png
|
2021-01-21 12:33:21.134593 |
318 |
39079674 |
CONSTRUCTION OF PUCCA DRAIN FROM SANAT SAHU HOUSE TO MODHU MAL HOUSE AT GHUSKIRA |
90000 |
CONSTRUCTION OF PUCCA DRAIN FROM SANAT SAHU HOUSE TO MODHU MAL HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41929521,24.41930696
Longitude : 87.85678077,87.85677013
file name : Image_08012021122904348.png
|
2021-01-08 12:29:04.509081 |
319 |
39079674 |
CONSTRUCTION OF PUCCA DRAIN FROM SANAT SAHU HOUSE TO MODHU MAL HOUSE AT GHUSKIRA |
90000 |
CONSTRUCTION OF PUCCA DRAIN FROM SANAT SAHU HOUSE TO MODHU MAL HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41929521,24.41930696
Longitude : 87.85678077,87.85677013
file name : Image_08012021122804263.png
|
2021-01-08 12:28:04.376387 |
320 |
39079674 |
CONSTRUCTION OF PUCCA DRAIN FROM SANAT SAHU HOUSE TO MODHU MAL HOUSE AT GHUSKIRA |
90000 |
CONSTRUCTION OF PUCCA DRAIN FROM SANAT SAHU HOUSE TO MODHU MAL HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.4192927,24.41929725
Longitude : 87.85668489,87.85676221
file name : Image_24122020145858870.png
|
2020-12-24 14:58:58.994445 |
321 |
39077525 |
CONSTRUCTION OF PUCCA DRAIN FROM NAJEM ALI HOUSE TO PITCH ROAD |
140000 |
CONSTRUCTION OF PUCCA DRAIN FROM NAJEM ALI HOUSE TO PITCH ROAD1 |
Completion of work |
-
latitude : 24.4472979,24.4472979
Longitude : 87.8530859,87.8530859
file name : Image_27012021140554002.png
|
2021-01-27 14:05:54.087281 |
322 |
39077525 |
CONSTRUCTION OF PUCCA DRAIN FROM NAJEM ALI HOUSE TO PITCH ROAD |
140000 |
CONSTRUCTION OF PUCCA DRAIN FROM NAJEM ALI HOUSE TO PITCH ROAD1 |
Completion of work |
-
latitude : 24.4472979,24.4472979
Longitude : 87.8530859,87.8530859
file name : Image_27012021140643783.png
|
2021-01-27 14:06:43.920813 |
323 |
39077525 |
CONSTRUCTION OF PUCCA DRAIN FROM NAJEM ALI HOUSE TO PITCH ROAD |
140000 |
CONSTRUCTION OF PUCCA DRAIN FROM NAJEM ALI HOUSE TO PITCH ROAD1 |
Completion of work |
-
latitude : 24.4472979,24.4472979
Longitude : 87.8530859,87.8530859
file name : Image_27012021140728367.png
|
2021-01-27 14:07:28.462929 |
324 |
39079103 |
INSTALLATION OF SOLAR SUBMARSIBLE PUMP WITH PIPE LINE NEAR TALBUNA PUKUR AT BHADI |
445000 |
INSTALLATION OF SOLAR SUBMARSIBLE PUMP WITH PIPE LINE NEAR TALBUNA PUKUR AT BHADI1 |
Completion of work |
-
latitude : 24.44065421
Longitude : 87.86219215
file name : Image_01092021115319369.png
|
2021-09-01 11:53:19.486645 |
325 |
39079103 |
INSTALLATION OF SOLAR SUBMARSIBLE PUMP WITH PIPE LINE NEAR TALBUNA PUKUR AT BHADI |
445000 |
INSTALLATION OF SOLAR SUBMARSIBLE PUMP WITH PIPE LINE NEAR TALBUNA PUKUR AT BHADI1 |
Completion of work |
-
latitude : 24.44062359
Longitude : 87.86223027
file name : Image_01092021115409578.png
|
2021-09-01 11:54:09.689073 |
326 |
39079103 |
INSTALLATION OF SOLAR SUBMARSIBLE PUMP WITH PIPE LINE NEAR TALBUNA PUKUR AT BHADI |
445000 |
INSTALLATION OF SOLAR SUBMARSIBLE PUMP WITH PIPE LINE NEAR TALBUNA PUKUR AT BHADI1 |
Completion of work |
-
latitude : 24.4405981
Longitude : 87.8622141
file name : Image_01092021115446507.png
|
2021-09-01 11:54:46.627821 |
327 |
39078200 |
CONSTRUCTION OF PCC ROAD FROM KANTU HOUSE TO MASJID AND IDU SK TO MAJIBUL SK HOUSE AT MURARAI |
175000 |
CONSTRUCTION OF PCC ROAD FROM KANTU HOUSE TO MASJID AND IDU SK TO MAJIBUL SK HOUSE AT MURARAI1 |
Completion of work |
-
latitude : 24.4385539,24.4385539
Longitude : 87.8548442,87.8548442
file name : Image_29092021125503076.png
|
2021-09-29 12:55:03.182224 |
328 |
39078200 |
CONSTRUCTION OF PCC ROAD FROM KANTU HOUSE TO MASJID AND IDU SK TO MAJIBUL SK HOUSE AT MURARAI |
175000 |
CONSTRUCTION OF PCC ROAD FROM KANTU HOUSE TO MASJID AND IDU SK TO MAJIBUL SK HOUSE AT MURARAI1 |
Completion of work |
-
latitude : 24.437837,24.43766435
Longitude : 87.85483906,87.854742
file name : Image_30092021140540764.png
|
2021-09-30 14:05:40.847204 |
329 |
39078200 |
CONSTRUCTION OF PCC ROAD FROM KANTU HOUSE TO MASJID AND IDU SK TO MAJIBUL SK HOUSE AT MURARAI |
175000 |
CONSTRUCTION OF PCC ROAD FROM KANTU HOUSE TO MASJID AND IDU SK TO MAJIBUL SK HOUSE AT MURARAI1 |
Completion of work |
-
latitude : 24.4385539,24.4385539
Longitude : 87.8548442,87.8548442
file name : Image_29092021125548882.png
|
2021-09-29 12:55:48.991648 |
330 |
34468840 |
INSTALLATION OF SOLAR LIGHT: (NEAR-1) EKDIL SK HOSE, 2)NOJIR MONDAL HOUSE, 3)RAJJAK SK HOUSE, |
160000 |
INSTALLATION OF SOLAR LIGHT: (NEAR-1) EKDIL SK HOSE, 2)NOJIR MONDAL HOUSE, 3)RAJJAK SK HOUSE,1 |
Completion of work |
-
latitude : 24.4444412
Longitude : 87.8529088
file name : Image_08092021133705671.png
|
2021-09-08 13:37:05.768231 |
331 |
34468840 |
INSTALLATION OF SOLAR LIGHT: (NEAR-1) EKDIL SK HOSE, 2)NOJIR MONDAL HOUSE, 3)RAJJAK SK HOUSE, |
160000 |
INSTALLATION OF SOLAR LIGHT: (NEAR-1) EKDIL SK HOSE, 2)NOJIR MONDAL HOUSE, 3)RAJJAK SK HOUSE,1 |
Completion of work |
-
latitude : 24.4444412
Longitude : 87.8529088
file name : Image_08092021133610969.png
|
2021-09-08 13:36:11.068568 |
332 |
34468840 |
INSTALLATION OF SOLAR LIGHT: (NEAR-1) EKDIL SK HOSE, 2)NOJIR MONDAL HOUSE, 3)RAJJAK SK HOUSE, |
160000 |
INSTALLATION OF SOLAR LIGHT: (NEAR-1) EKDIL SK HOSE, 2)NOJIR MONDAL HOUSE, 3)RAJJAK SK HOUSE,1 |
Completion of work |
-
latitude : 24.44225
Longitude : 87.8521182
file name : Image_08092021133410562.png
|
2021-09-08 13:34:10.681648 |
333 |
34473993 |
UPGRADATION OF PUCCA DRAIN FROM MOINA SK HOUSE TO JALIBAGAN CULVERT AT MURARAI |
100000 |
UPGRADATION OF PUCCA DRAIN FROM MOINA SK HOUSE TO JALIBAGAN CULVERT AT MURARAI1 |
Completion of work |
-
latitude : 24.4454199,24.4454237
Longitude : 87.8533668,87.8527543
file name : Image_02092021161245646.png
|
2021-09-02 16:12:45.726406 |
334 |
34473993 |
UPGRADATION OF PUCCA DRAIN FROM MOINA SK HOUSE TO JALIBAGAN CULVERT AT MURARAI |
100000 |
UPGRADATION OF PUCCA DRAIN FROM MOINA SK HOUSE TO JALIBAGAN CULVERT AT MURARAI1 |
Completion of work |
-
latitude : 24.4453277,24.4453492
Longitude : 87.8532649,87.8531638
file name : Image_02092021161144569.png
|
2021-09-02 16:11:44.649694 |
335 |
34473993 |
UPGRADATION OF PUCCA DRAIN FROM MOINA SK HOUSE TO JALIBAGAN CULVERT AT MURARAI |
100000 |
UPGRADATION OF PUCCA DRAIN FROM MOINA SK HOUSE TO JALIBAGAN CULVERT AT MURARAI1 |
Completion of work |
-
latitude : 24.4454298,24.4454298,24.4454298,24.4454298
Longitude : 87.8532788,87.8532788,87.8532788,87.8532788
file name : Image_24082021151202269.png
|
2021-08-24 15:12:02.357108 |
336 |
34787123 |
CONSTRUCTION OF PUCCA DRAIN FROM NOKID SK HOUSE TO SEBTU SK HOUSE AT GHUSKIRA |
120000 |
CONSTRUCTION OF PUCCA DRAIN FROM NOKID SK HOUSE TO SEBTU SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41563349,24.41564664
Longitude : 87.85609624,87.85607721
file name : Image_25012021141420618.png
|
2021-01-25 14:14:20.711239 |
337 |
34787123 |
CONSTRUCTION OF PUCCA DRAIN FROM NOKID SK HOUSE TO SEBTU SK HOUSE AT GHUSKIRA |
120000 |
CONSTRUCTION OF PUCCA DRAIN FROM NOKID SK HOUSE TO SEBTU SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41562954,24.41569564
Longitude : 87.85604996,87.8560959
file name : Image_25012021141540720.png
|
2021-01-25 14:15:40.815231 |
338 |
34787123 |
CONSTRUCTION OF PUCCA DRAIN FROM NOKID SK HOUSE TO SEBTU SK HOUSE AT GHUSKIRA |
120000 |
CONSTRUCTION OF PUCCA DRAIN FROM NOKID SK HOUSE TO SEBTU SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41558556,24.41566914
Longitude : 87.8561625,87.85611591
file name : Image_25012021141311027.png
|
2021-01-25 14:13:11.120297 |
339 |
39078975 |
CONSTRUCTION OF PUCCA DRAIN FROM KESTO ROY HOUSE TO RAMKRISHNA HOUSE VIA DEBDAS HOUSE TO |
150000 |
CONSTRUCTION OF PUCCA DRAIN FROM KESTO ROY HOUSE TO RAMKRISHNA HOUSE VIA DEBDAS HOUSE TO1 |
Completion of work |
-
latitude : 24.441474,24.441474
Longitude : 87.8648398,87.8648398
file name : Image_27082021173716528.png
|
2021-08-27 17:37:16.643509 |
340 |
39078975 |
CONSTRUCTION OF PUCCA DRAIN FROM KESTO ROY HOUSE TO RAMKRISHNA HOUSE VIA DEBDAS HOUSE TO |
150000 |
CONSTRUCTION OF PUCCA DRAIN FROM KESTO ROY HOUSE TO RAMKRISHNA HOUSE VIA DEBDAS HOUSE TO1 |
Completion of work |
-
latitude : 24.441474,24.441474
Longitude : 87.8648398,87.8648398
file name : Image_27082021173806184.png
|
2021-08-27 17:38:06.284286 |
341 |
39078975 |
CONSTRUCTION OF PUCCA DRAIN FROM KESTO ROY HOUSE TO RAMKRISHNA HOUSE VIA DEBDAS HOUSE TO |
150000 |
CONSTRUCTION OF PUCCA DRAIN FROM KESTO ROY HOUSE TO RAMKRISHNA HOUSE VIA DEBDAS HOUSE TO1 |
Completion of work |
-
latitude : 24.44101136,24.44112633
Longitude : 87.86530277,87.86501264
file name : Image_09082021130752710.png
|
2021-08-09 13:07:52.839128 |
342 |
39074964 |
REP. OF ALL WEATHER ROAD IN FESTIVAL DURGAPUJA, EID AND RAINY SEASON AT SANSAD (XIII TO XXIV) |
200000 |
REP. OF ALL WEATHER ROAD IN FESTIVAL DURGAPUJA, EID AND RAINY SEASON AT SANSAD (XIII TO XXIV)1 |
Completion of work |
-
latitude : 24.4541626,24.4541626
Longitude : 87.8481703,87.8481703
file name : Image_24082021114239622.png
|
2021-08-24 11:42:39.718427 |
343 |
39074964 |
REP. OF ALL WEATHER ROAD IN FESTIVAL DURGAPUJA, EID AND RAINY SEASON AT SANSAD (XIII TO XXIV) |
200000 |
REP. OF ALL WEATHER ROAD IN FESTIVAL DURGAPUJA, EID AND RAINY SEASON AT SANSAD (XIII TO XXIV)1 |
Completion of work |
-
latitude : 24.4541626,24.4541626
Longitude : 87.8481703,87.8481703
file name : Image_24082021131855655.png
|
2021-08-24 13:18:55.741671 |
344 |
39074964 |
REP. OF ALL WEATHER ROAD IN FESTIVAL DURGAPUJA, EID AND RAINY SEASON AT SANSAD (XIII TO XXIV) |
200000 |
REP. OF ALL WEATHER ROAD IN FESTIVAL DURGAPUJA, EID AND RAINY SEASON AT SANSAD (XIII TO XXIV)1 |
Completion of work |
-
latitude : 24.45670914,24.45668161
Longitude : 87.85061361,87.85063472
file name : Image_24082021163303273.png
|
2021-08-24 16:33:03.38136 |
345 |
39074964 |
REP. OF ALL WEATHER ROAD IN FESTIVAL DURGAPUJA, EID AND RAINY SEASON AT SANSAD (XIII TO XXIV) |
200000 |
REP. OF ALL WEATHER ROAD IN FESTIVAL DURGAPUJA, EID AND RAINY SEASON AT SANSAD (XIII TO XXIV)1 |
Completion of work |
-
latitude : 24.45416164,24.45417715
Longitude : 87.84871568,87.84867111
file name : Image_24082021112040522.png
|
2021-08-24 11:20:40.602123 |
346 |
39074964 |
REP. OF ALL WEATHER ROAD IN FESTIVAL DURGAPUJA, EID AND RAINY SEASON AT SANSAD (XIII TO XXIV) |
200000 |
REP. OF ALL WEATHER ROAD IN FESTIVAL DURGAPUJA, EID AND RAINY SEASON AT SANSAD (XIII TO XXIV)1 |
Completion of work |
-
latitude : 24.4542796,24.45434175
Longitude : 87.84872131,87.84880708
file name : Image_24082021111929127.png
|
2021-08-24 11:19:29.210033 |
347 |
39079527 |
CONSTRUCTION OF PUCCA DRAIN FROM BHARAT PAL HOUSE TO SANJIT RAJBANSHI HOUSE AT GOPALPUR |
200000 |
CONSTRUCTION OF PUCCA DRAIN FROM BHARAT PAL HOUSE TO SANJIT RAJBANSHI HOUSE AT GOPALPUR1 |
Completion of work |
-
latitude : 24.4397032,24.4397032
Longitude : 87.8629105,87.8629105
file name : Image_05082021170219659.png
|
2021-08-05 17:02:19.761649 |
348 |
39079527 |
CONSTRUCTION OF PUCCA DRAIN FROM BHARAT PAL HOUSE TO SANJIT RAJBANSHI HOUSE AT GOPALPUR |
200000 |
CONSTRUCTION OF PUCCA DRAIN FROM BHARAT PAL HOUSE TO SANJIT RAJBANSHI HOUSE AT GOPALPUR1 |
Completion of work |
-
latitude : 24.4397032,24.4397032
Longitude : 87.8629105,87.8629105
file name : Image_05082021170056593.png
|
2021-08-05 17:00:56.68914 |
349 |
39079527 |
CONSTRUCTION OF PUCCA DRAIN FROM BHARAT PAL HOUSE TO SANJIT RAJBANSHI HOUSE AT GOPALPUR |
200000 |
CONSTRUCTION OF PUCCA DRAIN FROM BHARAT PAL HOUSE TO SANJIT RAJBANSHI HOUSE AT GOPALPUR1 |
Completion of work |
-
latitude : 24.4397032,24.4397032
Longitude : 87.8629105,87.8629105
file name : Image_05082021170002525.png
|
2021-08-05 17:00:02.631619 |
350 |
39079594 |
CONSTRUCTION OF PUCCA DRAIN FROM TUFEL SK HOUSE TO MATRAGHAT VIA MASJID AT MATRAPARA |
150000 |
CONSTRUCTION OF PUCCA DRAIN FROM TUFEL SK HOUSE TO MATRAGHAT VIA MASJID AT MATRAPARA1 |
Completion of work |
-
latitude : 24.43471383,24.43479743
Longitude : 87.86588449,87.8658788
file name : Image_17032021152618559.png
|
2021-03-17 15:26:18.668213 |
351 |
39079594 |
CONSTRUCTION OF PUCCA DRAIN FROM TUFEL SK HOUSE TO MATRAGHAT VIA MASJID AT MATRAPARA |
150000 |
CONSTRUCTION OF PUCCA DRAIN FROM TUFEL SK HOUSE TO MATRAGHAT VIA MASJID AT MATRAPARA1 |
Completion of work |
-
latitude : 24.43471383,24.43479743
Longitude : 87.86588449,87.8658788
file name : Image_17032021152613487.png
|
2021-03-17 15:26:13.595251 |
352 |
39079594 |
CONSTRUCTION OF PUCCA DRAIN FROM TUFEL SK HOUSE TO MATRAGHAT VIA MASJID AT MATRAPARA |
150000 |
CONSTRUCTION OF PUCCA DRAIN FROM TUFEL SK HOUSE TO MATRAGHAT VIA MASJID AT MATRAPARA1 |
Completion of work |
-
latitude : 24.4343596,24.43438637
Longitude : 87.86624977,87.866226
file name : Image_17032021152608527.png
|
2021-03-17 15:26:08.628003 |
353 |
39079594 |
CONSTRUCTION OF PUCCA DRAIN FROM TUFEL SK HOUSE TO MATRAGHAT VIA MASJID AT MATRAPARA |
150000 |
CONSTRUCTION OF PUCCA DRAIN FROM TUFEL SK HOUSE TO MATRAGHAT VIA MASJID AT MATRAPARA1 |
Completion of work |
-
latitude : 24.43437185,24.43435831
Longitude : 87.86636244,87.86633517
file name : Image_15032021152244876.png
|
2021-03-15 15:22:44.974944 |
354 |
39079594 |
CONSTRUCTION OF PUCCA DRAIN FROM TUFEL SK HOUSE TO MATRAGHAT VIA MASJID AT MATRAPARA |
150000 |
CONSTRUCTION OF PUCCA DRAIN FROM TUFEL SK HOUSE TO MATRAGHAT VIA MASJID AT MATRAPARA1 |
Completion of work |
-
latitude : 24.43438801,24.43435871
Longitude : 87.86634196,87.86643605
file name : Image_15032021152158361.png
|
2021-03-15 15:21:58.449952 |
355 |
39059271 |
UPGRADATION OF PUCCA DRAIN FROM KHUDU MONDAL HOUSE TO MOTIN MONDAL HOUSE AT GHUSKIRA |
102389 |
UPGRADATION OF PUCCA DRAIN FROM KHUDU MONDAL HOUSE TO MOTIN MONDAL HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41502776,24.41518867
Longitude : 87.85835677,87.85810309
file name : Image_03112021144614162.png
|
2021-11-03 14:46:14.267076 |
356 |
39059271 |
UPGRADATION OF PUCCA DRAIN FROM KHUDU MONDAL HOUSE TO MOTIN MONDAL HOUSE AT GHUSKIRA |
102389 |
UPGRADATION OF PUCCA DRAIN FROM KHUDU MONDAL HOUSE TO MOTIN MONDAL HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41523209,24.41522829
Longitude : 87.85816399,87.85812279
file name : Image_03112021144852995.png
|
2021-11-03 14:48:53.0903 |
357 |
39059271 |
UPGRADATION OF PUCCA DRAIN FROM KHUDU MONDAL HOUSE TO MOTIN MONDAL HOUSE AT GHUSKIRA |
102389 |
UPGRADATION OF PUCCA DRAIN FROM KHUDU MONDAL HOUSE TO MOTIN MONDAL HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41517792,24.41517823
Longitude : 87.85810761,87.8581075
file name : Image_03112021160900324.png
|
2021-11-03 16:09:00.403334 |
358 |
39079834 |
CONSTRUCTION OF PUCCA DRAIN FROM DELSAD SK HOUSE TO KABATUL SK HOUSE AT GHUSKIRA |
150000 |
CONSTRUCTION OF PUCCA DRAIN FROM DELSAD SK HOUSE TO KABATUL SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.4454123,24.4454123
Longitude : 87.853412,87.853412
file name : Image_24082021132107358.png
|
2021-08-24 13:21:07.44607 |
359 |
39079834 |
CONSTRUCTION OF PUCCA DRAIN FROM DELSAD SK HOUSE TO KABATUL SK HOUSE AT GHUSKIRA |
150000 |
CONSTRUCTION OF PUCCA DRAIN FROM DELSAD SK HOUSE TO KABATUL SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.4454123,24.4454123
Longitude : 87.853412,87.853412
file name : Image_24082021132159199.png
|
2021-08-24 13:21:59.283289 |
360 |
39079834 |
CONSTRUCTION OF PUCCA DRAIN FROM DELSAD SK HOUSE TO KABATUL SK HOUSE AT GHUSKIRA |
150000 |
CONSTRUCTION OF PUCCA DRAIN FROM DELSAD SK HOUSE TO KABATUL SK HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.4454123,24.4454123
Longitude : 87.853412,87.853412
file name : Image_24082021132014402.png
|
2021-08-24 13:20:14.491905 |
361 |
39080302 |
CONSTRUCTION OF PUCCA DRAIN FROM SADEKUL HOUSE TO OKTIYA MASJID AT GHUSKIRA |
100000 |
CONSTRUCTION OF PUCCA DRAIN FROM SADEKUL HOUSE TO OKTIYA MASJID AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.4454123,24.4454123
Longitude : 87.853412,87.853412
file name : Image_24082021132717106.png
|
2021-08-24 13:27:17.196594 |
362 |
39080302 |
CONSTRUCTION OF PUCCA DRAIN FROM SADEKUL HOUSE TO OKTIYA MASJID AT GHUSKIRA |
100000 |
CONSTRUCTION OF PUCCA DRAIN FROM SADEKUL HOUSE TO OKTIYA MASJID AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.4454123,24.4454123
Longitude : 87.853412,87.853412
file name : Image_24082021132910861.png
|
2021-08-24 13:29:10.966257 |
363 |
39080302 |
CONSTRUCTION OF PUCCA DRAIN FROM SADEKUL HOUSE TO OKTIYA MASJID AT GHUSKIRA |
100000 |
CONSTRUCTION OF PUCCA DRAIN FROM SADEKUL HOUSE TO OKTIYA MASJID AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.4454123,24.4454123
Longitude : 87.853412,87.853412
file name : Image_24082021132934587.png
|
2021-08-24 13:29:34.675163 |
364 |
39078587 |
CONSTRUCTION OF PUCCA DRAIN FROM SWAPAN DUTTA HOUSE TO MODESWAR HOSSAIN LAND AT MURARAI |
51061 |
CONSTRUCTION OF PUCCA DRAIN FROM SWAPAN DUTTA HOUSE TO MODESWAR HOSSAIN LAND AT MURARAI1 |
Completion of work |
-
latitude : 24.4434619,24.4433751
Longitude : 87.8573855,87.8575561
file name : Image_23032021121431574.png
|
2021-03-23 12:14:31.659246 |
365 |
39078587 |
CONSTRUCTION OF PUCCA DRAIN FROM SWAPAN DUTTA HOUSE TO MODESWAR HOSSAIN LAND AT MURARAI |
51061 |
CONSTRUCTION OF PUCCA DRAIN FROM SWAPAN DUTTA HOUSE TO MODESWAR HOSSAIN LAND AT MURARAI1 |
Completion of work |
-
latitude : 24.4433751,24.4432959
Longitude : 87.8575561,87.8576642
file name : Image_23032021121435515.png
|
2021-03-23 12:14:35.596525 |
366 |
39078587 |
CONSTRUCTION OF PUCCA DRAIN FROM SWAPAN DUTTA HOUSE TO MODESWAR HOSSAIN LAND AT MURARAI |
51061 |
CONSTRUCTION OF PUCCA DRAIN FROM SWAPAN DUTTA HOUSE TO MODESWAR HOSSAIN LAND AT MURARAI1 |
Completion of work |
-
latitude : 24.4435681,24.4435744
Longitude : 87.8575769,87.857389
file name : Image_23032021121444513.png
|
2021-03-23 12:14:44.595685 |
367 |
39078587 |
CONSTRUCTION OF PUCCA DRAIN FROM SWAPAN DUTTA HOUSE TO MODESWAR HOSSAIN LAND AT MURARAI |
51061 |
CONSTRUCTION OF PUCCA DRAIN FROM SWAPAN DUTTA HOUSE TO MODESWAR HOSSAIN LAND AT MURARAI1 |
Completion of work |
-
latitude : 24.4435681,24.4435744
Longitude : 87.8575769,87.857389
file name : Image_23032021121457984.png
|
2021-03-23 12:14:58.066072 |
368 |
39078587 |
CONSTRUCTION OF PUCCA DRAIN FROM SWAPAN DUTTA HOUSE TO MODESWAR HOSSAIN LAND AT MURARAI |
51061 |
CONSTRUCTION OF PUCCA DRAIN FROM SWAPAN DUTTA HOUSE TO MODESWAR HOSSAIN LAND AT MURARAI1 |
Completion of work |
-
latitude : 24.44347168,24.44340163
Longitude : 87.8576277,87.85762843
file name : Image_02032021135559472.png
|
2021-03-02 13:55:59.581089 |
369 |
39079986 |
CONSTRUCTION OF PUCCA DRAIN FROM MISTER MOLLICK SHOP TO NURUL MOLLICK HOUSE AT DADPUR |
220000 |
CONSTRUCTION OF PUCCA DRAIN FROM MISTER MOLLICK SHOP TO NURUL MOLLICK HOUSE AT DADPUR1 |
Completion of work |
-
latitude : 24.40918962,24.40943537
Longitude : 87.86368246,87.86354096
file name : Image_12082021175353658.png
|
2021-08-12 17:53:53.76257 |
370 |
39079986 |
CONSTRUCTION OF PUCCA DRAIN FROM MISTER MOLLICK SHOP TO NURUL MOLLICK HOUSE AT DADPUR |
220000 |
CONSTRUCTION OF PUCCA DRAIN FROM MISTER MOLLICK SHOP TO NURUL MOLLICK HOUSE AT DADPUR1 |
Completion of work |
-
latitude : 24.40945878,24.40949467
Longitude : 87.8634845,87.86342772
file name : Image_12082021175503893.png
|
2021-08-12 17:55:03.993888 |
371 |
39079986 |
CONSTRUCTION OF PUCCA DRAIN FROM MISTER MOLLICK SHOP TO NURUL MOLLICK HOUSE AT DADPUR |
220000 |
CONSTRUCTION OF PUCCA DRAIN FROM MISTER MOLLICK SHOP TO NURUL MOLLICK HOUSE AT DADPUR1 |
Completion of work |
-
latitude : 24.40945205,24.40950684
Longitude : 87.86349593,87.86345497
file name : Image_27082021115043475.png
|
2021-08-27 11:50:43.576044 |
372 |
39079986 |
CONSTRUCTION OF PUCCA DRAIN FROM MISTER MOLLICK SHOP TO NURUL MOLLICK HOUSE AT DADPUR |
220000 |
CONSTRUCTION OF PUCCA DRAIN FROM MISTER MOLLICK SHOP TO NURUL MOLLICK HOUSE AT DADPUR1 |
Completion of work |
-
latitude : 24.40937213,24.40927584
Longitude : 87.86360488,87.86364093
file name : Image_27082021115147347.png
|
2021-08-27 11:51:47.454593 |
373 |
34351352 |
UPGRADATION OF BOTH SIDE PUCCA DRAIN FROM ARUN GOSWAMI HOUSE TO PINTU SK HOUSE AT DHITORA |
200000 |
UPGRADATION OF BOTH SIDE PUCCA DRAIN FROM ARUN GOSWAMI HOUSE TO PINTU SK HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.4486354,24.4486354
Longitude : 87.8526225,87.8526225
file name : Image_09092021141325421.png
|
2021-09-09 14:13:25.511305 |
374 |
34351352 |
UPGRADATION OF BOTH SIDE PUCCA DRAIN FROM ARUN GOSWAMI HOUSE TO PINTU SK HOUSE AT DHITORA |
200000 |
UPGRADATION OF BOTH SIDE PUCCA DRAIN FROM ARUN GOSWAMI HOUSE TO PINTU SK HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.4486354,24.4486354
Longitude : 87.8526225,87.8526225
file name : Image_09092021141504299.png
|
2021-09-09 14:15:04.393157 |
375 |
34351352 |
UPGRADATION OF BOTH SIDE PUCCA DRAIN FROM ARUN GOSWAMI HOUSE TO PINTU SK HOUSE AT DHITORA |
200000 |
UPGRADATION OF BOTH SIDE PUCCA DRAIN FROM ARUN GOSWAMI HOUSE TO PINTU SK HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.4486354,24.4486354
Longitude : 87.8526225,87.8526225
file name : Image_09092021141424181.png
|
2021-09-09 14:14:24.272674 |
376 |
39075688 |
CONSTRUCTION OF PUCCA DRAIN FROM HASIMUDDIN HOUSE TO CHOHATAN AT DHITORA |
100000 |
CONSTRUCTION OF PUCCA DRAIN FROM HASIMUDDIN HOUSE TO CHOHATAN AT DHITORA1 |
Completion of work |
-
latitude : 24.45648125,24.45656002
Longitude : 87.85019703,87.85021403
file name : Image_07102021162546708.png
|
2021-10-07 16:25:46.817324 |
377 |
39075688 |
CONSTRUCTION OF PUCCA DRAIN FROM HASIMUDDIN HOUSE TO CHOHATAN AT DHITORA |
100000 |
CONSTRUCTION OF PUCCA DRAIN FROM HASIMUDDIN HOUSE TO CHOHATAN AT DHITORA1 |
Completion of work |
-
latitude : 24.45671557,24.45667238
Longitude : 87.85029003,87.85023735
file name : Image_07102021162413577.png
|
2021-10-07 16:24:13.661477 |
378 |
39075688 |
CONSTRUCTION OF PUCCA DRAIN FROM HASIMUDDIN HOUSE TO CHOHATAN AT DHITORA |
100000 |
CONSTRUCTION OF PUCCA DRAIN FROM HASIMUDDIN HOUSE TO CHOHATAN AT DHITORA1 |
Completion of work |
-
latitude : 24.45660395,24.45655581
Longitude : 87.85023506,87.85021358
file name : Image_07102021162457114.png
|
2021-10-07 16:24:57.209283 |
379 |
39075688 |
CONSTRUCTION OF PUCCA DRAIN FROM HASIMUDDIN HOUSE TO CHOHATAN AT DHITORA |
100000 |
CONSTRUCTION OF PUCCA DRAIN FROM HASIMUDDIN HOUSE TO CHOHATAN AT DHITORA1 |
Completion of work |
-
latitude : 24.45660394,24.45671618
Longitude : 87.85022477,87.85027476
file name : Image_07102021162648272.png
|
2021-10-07 16:26:48.363884 |
380 |
39075711 |
CONSTRUCTION OF PUCCA DRAIN FROM RASID DEWAN HOUSE TO PIRU SK HOUSE AT DHITORA |
120000 |
CONSTRUCTION OF PUCCA DRAIN FROM RASID DEWAN HOUSE TO PIRU SK HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.4403896,24.4403896
Longitude : 87.8558676,87.8558676
file name : Image_06092021130314523.png
|
2021-09-06 13:03:14.612774 |
381 |
39075711 |
CONSTRUCTION OF PUCCA DRAIN FROM RASID DEWAN HOUSE TO PIRU SK HOUSE AT DHITORA |
120000 |
CONSTRUCTION OF PUCCA DRAIN FROM RASID DEWAN HOUSE TO PIRU SK HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.4403896,24.4403896
Longitude : 87.8558676,87.8558676
file name : Image_06092021130143766.png
|
2021-09-06 13:01:43.854229 |
382 |
39075711 |
CONSTRUCTION OF PUCCA DRAIN FROM RASID DEWAN HOUSE TO PIRU SK HOUSE AT DHITORA |
120000 |
CONSTRUCTION OF PUCCA DRAIN FROM RASID DEWAN HOUSE TO PIRU SK HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.4403896,24.4403896
Longitude : 87.8558676,87.8558676
file name : Image_06092021130430072.png
|
2021-09-06 13:04:30.160493 |
383 |
39075711 |
CONSTRUCTION OF PUCCA DRAIN FROM RASID DEWAN HOUSE TO PIRU SK HOUSE AT DHITORA |
120000 |
CONSTRUCTION OF PUCCA DRAIN FROM RASID DEWAN HOUSE TO PIRU SK HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.4403896,24.4403896
Longitude : 87.8558676,87.8558676
file name : Image_06092021130539901.png
|
2021-09-06 13:05:40.0025 |
384 |
39078360 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER SLAB FROM MUSTAKIM AHAMMED HOUSE TO MURSALIM |
90000 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER SLAB FROM MUSTAKIM AHAMMED HOUSE TO MURSALIM1 |
Completion of work |
-
latitude : 24.41931348,24.41933337
Longitude : 87.85668371,87.85674829
file name : Image_08012021123241104.png
|
2021-01-08 12:32:41.223761 |
385 |
39078360 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER SLAB FROM MUSTAKIM AHAMMED HOUSE TO MURSALIM |
90000 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER SLAB FROM MUSTAKIM AHAMMED HOUSE TO MURSALIM1 |
Completion of work |
-
latitude : 24.44046583,24.44047681
Longitude : 87.85029442,87.8502037
file name : Image_24122020151112315.png
|
2020-12-24 15:11:12.403111 |
386 |
34501364 |
UPGRADATION OF PCC ROAD FROM MD KHALED HOUSE TO ANOWAR MEHENA HOUSE AT BHADISWAR |
100000 |
UPGRADATION OF PCC ROAD FROM MD KHALED HOUSE TO ANOWAR MEHENA HOUSE AT BHADISWAR1 |
Plinth level |
-
latitude : 24.45397599,24.45397167
Longitude : 87.84847055,87.84847683
file name : Image_08012021141830469.png
|
2021-01-08 14:18:30.562846 |
387 |
34501364 |
UPGRADATION OF PCC ROAD FROM MD KHALED HOUSE TO ANOWAR MEHENA HOUSE AT BHADISWAR |
100000 |
UPGRADATION OF PCC ROAD FROM MD KHALED HOUSE TO ANOWAR MEHENA HOUSE AT BHADISWAR1 |
Plinth level |
-
latitude : 24.45393959,24.45389902
Longitude : 87.84842052,87.84837901
file name : Image_08012021141547605.png
|
2021-01-08 14:15:47.678948 |
388 |
34501364 |
UPGRADATION OF PCC ROAD FROM MD KHALED HOUSE TO ANOWAR MEHENA HOUSE AT BHADISWAR |
100000 |
UPGRADATION OF PCC ROAD FROM MD KHALED HOUSE TO ANOWAR MEHENA HOUSE AT BHADISWAR1 |
Completion of work |
-
latitude : 24.43571841,24.435718
Longitude : 87.8650604,87.86503146
file name : Image_19122020115447640.png
|
2020-12-19 11:54:47.745111 |
389 |
34513958 |
UPGRADATION OF PCC ROAD FROM ANU MAL HOUSE TO SOSTI TALA AT RAMCHANDRAPUR |
90000 |
UPGRADATION OF PCC ROAD FROM ANU MAL HOUSE TO SOSTI TALA AT RAMCHANDRAPUR1 |
Plinth level |
-
latitude : 24.4193248,24.4193248
Longitude : 87.859373,87.859373
file name : Image_08012021120107771.png
|
2021-01-08 12:01:07.879225 |
390 |
34513958 |
UPGRADATION OF PCC ROAD FROM ANU MAL HOUSE TO SOSTI TALA AT RAMCHANDRAPUR |
90000 |
UPGRADATION OF PCC ROAD FROM ANU MAL HOUSE TO SOSTI TALA AT RAMCHANDRAPUR1 |
Plinth level |
-
latitude : 24.41923008,24.4192193
Longitude : 87.85964594,87.8596825
file name : Image_08012021114515557.png
|
2021-01-08 11:45:15.665302 |
391 |
34513958 |
UPGRADATION OF PCC ROAD FROM ANU MAL HOUSE TO SOSTI TALA AT RAMCHANDRAPUR |
90000 |
UPGRADATION OF PCC ROAD FROM ANU MAL HOUSE TO SOSTI TALA AT RAMCHANDRAPUR1 |
Plinth level |
-
latitude : 24.41923008,24.4192193
Longitude : 87.85964594,87.8596825
file name : Image_08012021114538587.png
|
2021-01-08 11:45:38.697721 |
392 |
34513958 |
UPGRADATION OF PCC ROAD FROM ANU MAL HOUSE TO SOSTI TALA AT RAMCHANDRAPUR |
90000 |
UPGRADATION OF PCC ROAD FROM ANU MAL HOUSE TO SOSTI TALA AT RAMCHANDRAPUR1 |
Completion of work |
-
latitude : 24.41876967,24.41885527
Longitude : 87.85356432,87.85355798
file name : Image_22122020162706964.png
|
2020-12-22 16:27:07.058733 |
393 |
34502001 |
UPGRADATION OF PCC ROAD FROM DHRUB PAL HOUSE TO AMAL PAL HOUSE AT GOPALPUR |
130000 |
UPGRADATION OF PCC ROAD FROM DHRUB PAL HOUSE TO AMAL PAL HOUSE AT GOPALPUR1 |
Plinth level |
-
latitude : 24.43519357,24.43517849
Longitude : 87.87317784,87.87319202
file name : Image_20012021135416883.png
|
2021-01-20 13:54:16.97302 |
394 |
34502001 |
UPGRADATION OF PCC ROAD FROM DHRUB PAL HOUSE TO AMAL PAL HOUSE AT GOPALPUR |
130000 |
UPGRADATION OF PCC ROAD FROM DHRUB PAL HOUSE TO AMAL PAL HOUSE AT GOPALPUR1 |
Plinth level |
-
latitude : 24.43526629,24.43518307
Longitude : 87.87322627,87.87316679
file name : Image_18012021114343738.png
|
2021-01-18 11:43:43.840846 |
395 |
34502001 |
UPGRADATION OF PCC ROAD FROM DHRUB PAL HOUSE TO AMAL PAL HOUSE AT GOPALPUR |
130000 |
UPGRADATION OF PCC ROAD FROM DHRUB PAL HOUSE TO AMAL PAL HOUSE AT GOPALPUR1 |
Completion of work |
-
latitude : 24.43569111,24.43568931
Longitude : 87.86496774,87.86492603
file name : Image_19122020115546800.png
|
2020-12-19 11:55:46.911392 |
396 |
34512956 |
UPGRADATION OF PCC ROAD FROM NAIMUDDIN SK HOUSE TO PCC ROAD, ABDUL SALAM HOUSE TO KHAYER KAJI |
180520 |
UPGRADATION OF PCC ROAD FROM NAIMUDDIN SK HOUSE TO PCC ROAD, ABDUL SALAM HOUSE TO KHAYER KAJI1 |
Plinth level |
-
latitude : 24.44281622,24.44280394
Longitude : 87.860507,87.8604985
file name : Image_08012021152112228.png
|
2021-01-08 15:21:12.319874 |
397 |
34512956 |
UPGRADATION OF PCC ROAD FROM NAIMUDDIN SK HOUSE TO PCC ROAD, ABDUL SALAM HOUSE TO KHAYER KAJI |
180520 |
UPGRADATION OF PCC ROAD FROM NAIMUDDIN SK HOUSE TO PCC ROAD, ABDUL SALAM HOUSE TO KHAYER KAJI1 |
Plinth level |
-
latitude : 24.43539826,24.43539832
Longitude : 87.87387316,87.87387354
file name : Image_07012021162523833.png
|
2021-01-07 16:25:23.917418 |
398 |
34512956 |
UPGRADATION OF PCC ROAD FROM NAIMUDDIN SK HOUSE TO PCC ROAD, ABDUL SALAM HOUSE TO KHAYER KAJI |
180520 |
UPGRADATION OF PCC ROAD FROM NAIMUDDIN SK HOUSE TO PCC ROAD, ABDUL SALAM HOUSE TO KHAYER KAJI1 |
Completion of work |
-
latitude : 24.43572783,24.43573973
Longitude : 87.86470365,87.86466887
file name : Image_19122020115933355.png
|
2020-12-19 11:59:33.463732 |
399 |
39078540 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER SLAB FROM TOFAJUL HAQUE HOUSE TO GOUTAM HOUSE VIA SWADHIN |
100000 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER SLAB FROM TOFAJUL HAQUE HOUSE TO GOUTAM HOUSE VIA SWADHIN |
Completion of work |
-
latitude : 24.44207436,24.44207629
Longitude : 87.85634099,87.85630922
file name : Image_19012021131646459.png
|
2021-01-19 13:16:46.55007 |
400 |
39078540 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER SLAB FROM TOFAJUL HAQUE HOUSE TO GOUTAM HOUSE VIA SWADHIN |
100000 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER SLAB FROM TOFAJUL HAQUE HOUSE TO GOUTAM HOUSE VIA SWADHIN |
Completion of work |
-
latitude : 24.44205647,24.4421239
Longitude : 87.85628238,87.85629744
file name : Image_19012021131734043.png
|
2021-01-19 13:17:34.130512 |
401 |
39078540 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER SLAB FROM TOFAJUL HAQUE HOUSE TO GOUTAM HOUSE VIA SWADHIN |
100000 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER SLAB FROM TOFAJUL HAQUE HOUSE TO GOUTAM HOUSE VIA SWADHIN |
Completion of work |
-
latitude : 24.44220935,24.4423765
Longitude : 87.85655628,87.8565053
file name : Image_19012021131903434.png
|
2021-01-19 13:19:03.532251 |
402 |
34364226 |
UPGRADATION OF PCC ROAD FROM ANSARUL DEWAN TO EID GAHA AT PANIARA |
100000 |
UPGRADATION OF PCC ROAD FROM ANSARUL DEWAN TO EID GAHA AT PANIARA1 |
Plinth level |
-
latitude : 24.43725929,24.43723947
Longitude : 87.84325848,87.84334768
file name : Image_19022021133930975.png
|
2021-02-19 13:39:31.087414 |
403 |
34364226 |
UPGRADATION OF PCC ROAD FROM ANSARUL DEWAN TO EID GAHA AT PANIARA |
100000 |
UPGRADATION OF PCC ROAD FROM ANSARUL DEWAN TO EID GAHA AT PANIARA1 |
Plinth level |
-
latitude : 24.43720971,24.43727677
Longitude : 87.84320578,87.84314185
file name : Image_19022021133709314.png
|
2021-02-19 13:37:09.422898 |
404 |
34364226 |
UPGRADATION OF PCC ROAD FROM ANSARUL DEWAN TO EID GAHA AT PANIARA |
100000 |
UPGRADATION OF PCC ROAD FROM ANSARUL DEWAN TO EID GAHA AT PANIARA1 |
Plinth level |
-
latitude : 24.43726006,24.43725608
Longitude : 87.84316354,87.84311654
file name : Image_19022021134008818.png
|
2021-02-19 13:40:08.921027 |
405 |
34364226 |
UPGRADATION OF PCC ROAD FROM ANSARUL DEWAN TO EID GAHA AT PANIARA |
100000 |
UPGRADATION OF PCC ROAD FROM ANSARUL DEWAN TO EID GAHA AT PANIARA1 |
Plinth level |
-
latitude : 24.43725483,24.43727396
Longitude : 87.84313764,87.8431311
file name : Image_19022021134330633.png
|
2021-02-19 13:43:30.746084 |
406 |
34364226 |
UPGRADATION OF PCC ROAD FROM ANSARUL DEWAN TO EID GAHA AT PANIARA |
100000 |
UPGRADATION OF PCC ROAD FROM ANSARUL DEWAN TO EID GAHA AT PANIARA1 |
Completion of work |
-
latitude : 24.43723465,24.43710276
Longitude : 87.84361431,87.84349571
file name : Image_19122020143138301.png
|
2020-12-19 14:31:38.405196 |
407 |
47147185 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM NURUL ISLAM TO HASMAT SK HOUSE AT MURARAI DORGATALA |
120000 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM NURUL ISLAM TO HASMAT SK HOUSE AT MURARAI DORGATALA |
Completion of work |
-
latitude : 24.4416495,24.441678
Longitude : 87.8522977,87.8521333
file name : Image_21032022112507709.png
|
2022-03-21 11:25:07.803828 |
408 |
47147185 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM NURUL ISLAM TO HASMAT SK HOUSE AT MURARAI DORGATALA |
120000 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM NURUL ISLAM TO HASMAT SK HOUSE AT MURARAI DORGATALA |
Completion of work |
-
latitude : 24.4416495,24.4416492
Longitude : 87.8522977,87.8522966
file name : Image_21032022112445981.png
|
2022-03-21 11:24:46.071941 |
409 |
47147185 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM NURUL ISLAM TO HASMAT SK HOUSE AT MURARAI DORGATALA |
120000 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM NURUL ISLAM TO HASMAT SK HOUSE AT MURARAI DORGATALA |
Completion of work |
-
latitude : 24.4416495,24.441678
Longitude : 87.8522977,87.8521333
file name : Image_21032022112442201.png
|
2022-03-21 11:24:42.292315 |
410 |
47147185 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM NURUL ISLAM TO HASMAT SK HOUSE AT MURARAI DORGATALA |
120000 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM NURUL ISLAM TO HASMAT SK HOUSE AT MURARAI DORGATALA |
Completion of work |
-
latitude : 24.4416495,24.4416495
Longitude : 87.8522977,87.8522977
file name : Image_21032022112438245.png
|
2022-03-21 11:24:38.3596 |
411 |
47147185 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM NURUL ISLAM TO HASMAT SK HOUSE AT MURARAI DORGATALA |
120000 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM NURUL ISLAM TO HASMAT SK HOUSE AT MURARAI DORGATALA |
Completion of work |
-
latitude : 24.441715,24.44195666666667
Longitude : 87.85225333333334,87.85226666666668
file name : Image_21032022112449635.png
|
2022-03-21 11:24:49.72939 |
412 |
47147185 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM NURUL ISLAM TO HASMAT SK HOUSE AT MURARAI DORGATALA |
120000 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM NURUL ISLAM TO HASMAT SK HOUSE AT MURARAI DORGATALA |
Completion of work |
-
latitude : 24.4416495,24.4416492
Longitude : 87.8522977,87.8522966
file name : Image_21032022112512339.png
|
2022-03-21 11:25:12.430979 |
413 |
47147185 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM NURUL ISLAM TO HASMAT SK HOUSE AT MURARAI DORGATALA |
120000 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM NURUL ISLAM TO HASMAT SK HOUSE AT MURARAI DORGATALA |
Completion of work |
-
latitude : 24.441715,24.44195666666667
Longitude : 87.85225333333334,87.85226666666668
file name : Image_21032022112516385.png
|
2022-03-21 11:25:16.478875 |
414 |
34359963 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO TAKBIR SK HOUSE VIA AINAL HAQUE HOUSE AT DHITORA |
100000 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO TAKBIR SK HOUSE VIA AINAL HAQUE HOUSE AT DHITORA1 |
Plinth level |
-
latitude : 24.45394487,24.4541639
Longitude : 87.84845983,87.8481746
file name : Image_08012021141040631.png
|
2021-01-08 14:10:40.71599 |
415 |
34359963 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO TAKBIR SK HOUSE VIA AINAL HAQUE HOUSE AT DHITORA |
100000 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO TAKBIR SK HOUSE VIA AINAL HAQUE HOUSE AT DHITORA1 |
Plinth level |
-
latitude : 24.45382639,24.45381838
Longitude : 87.84834488,87.8483528
file name : Image_08012021135833521.png
|
2021-01-08 13:58:33.62204 |
416 |
34359963 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO TAKBIR SK HOUSE VIA AINAL HAQUE HOUSE AT DHITORA |
100000 |
UPGRADATION OF PCC ROAD FROM PITCH ROAD TO TAKBIR SK HOUSE VIA AINAL HAQUE HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.45384006,24.45375179
Longitude : 87.84833471,87.84827295
file name : Image_19122020124934797.png
|
2020-12-19 12:49:34.894342 |
417 |
34361495 |
UPGRADATION OF PCC ROAD FROM SIMAM HOUSE TO MORDUN HOUSE AT PANIARA |
50000 |
UPGRADATION OF PCC ROAD FROM SIMAM HOUSE TO MORDUN HOUSE AT PANIARA1 |
Plinth level |
-
latitude : 24.43564372,24.43571546
Longitude : 87.84632975,87.84623698
file name : Image_04032021132750693.png
|
2021-03-04 13:27:50.80194 |
418 |
34361495 |
UPGRADATION OF PCC ROAD FROM SIMAM HOUSE TO MORDUN HOUSE AT PANIARA |
50000 |
UPGRADATION OF PCC ROAD FROM SIMAM HOUSE TO MORDUN HOUSE AT PANIARA1 |
Plinth level |
-
latitude : 24.43564372,24.43571546
Longitude : 87.84632975,87.84623698
file name : Image_04032021132717073.png
|
2021-03-04 13:27:17.171386 |
419 |
34361495 |
UPGRADATION OF PCC ROAD FROM SIMAM HOUSE TO MORDUN HOUSE AT PANIARA |
50000 |
UPGRADATION OF PCC ROAD FROM SIMAM HOUSE TO MORDUN HOUSE AT PANIARA1 |
Plinth level |
-
latitude : 24.43570088,24.43567987
Longitude : 87.84616977,87.84619143
file name : Image_04032021132713081.png
|
2021-03-04 13:27:13.189425 |
420 |
34361495 |
UPGRADATION OF PCC ROAD FROM SIMAM HOUSE TO MORDUN HOUSE AT PANIARA |
50000 |
UPGRADATION OF PCC ROAD FROM SIMAM HOUSE TO MORDUN HOUSE AT PANIARA1 |
Completion of work |
-
latitude : 24.43710457,24.43712846
Longitude : 87.84351671,87.84357306
file name : Image_19122020143251616.png
|
2020-12-19 14:32:51.715605 |
421 |
47114197 |
PURCHASE TUBEWELL MATERIAL FOR MAINTAINANCE OF TUBEWELL THROUGH THE SANSAD NO I TO XII UNDER MURARAI |
495000 |
PURCHASE TUBEWELL MATERIAL FOR MAINTAINANCE OF TUBEWELL THROUGH THE SANSAD NO I TO XII UNDER MURARAI |
Completion of work |
-
latitude : 24.4403414
Longitude : 87.8562162
file name : Image_28012022152033354.png
|
2022-01-28 15:20:33.345485 |
422 |
47114197 |
PURCHASE TUBEWELL MATERIAL FOR MAINTAINANCE OF TUBEWELL THROUGH THE SANSAD NO I TO XII UNDER MURARAI |
495000 |
PURCHASE TUBEWELL MATERIAL FOR MAINTAINANCE OF TUBEWELL THROUGH THE SANSAD NO I TO XII UNDER MURARAI |
Completion of work |
-
latitude : 24.4403638
Longitude : 87.8561861
file name : Image_28012022151952271.png
|
2022-01-28 15:19:52.249865 |
423 |
47114197 |
PURCHASE TUBEWELL MATERIAL FOR MAINTAINANCE OF TUBEWELL THROUGH THE SANSAD NO I TO XII UNDER MURARAI |
495000 |
PURCHASE TUBEWELL MATERIAL FOR MAINTAINANCE OF TUBEWELL THROUGH THE SANSAD NO I TO XII UNDER MURARAI |
Completion of work |
-
latitude : 24.440226666666664
Longitude : 87.85640166666666
file name : Image_28012022151904070.png
|
2022-01-28 15:19:04.096099 |
424 |
47147335 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MOHAMAYA MUKHERJEE HOUSE TO PCC ROAD AT GHUSKIRA |
120000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MOHAMAYA MUKHERJEE HOUSE TO PCC ROAD AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.440216,24.440216
Longitude : 87.8562584,87.8562584
file name : Image_28012022142543701.png
|
2022-01-28 14:25:43.8267 |
425 |
47147335 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MOHAMAYA MUKHERJEE HOUSE TO PCC ROAD AT GHUSKIRA |
120000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MOHAMAYA MUKHERJEE HOUSE TO PCC ROAD AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.440216,24.440216
Longitude : 87.8562584,87.8562584
file name : Image_28012022142732431.png
|
2022-01-28 14:27:32.539552 |
426 |
47147335 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MOHAMAYA MUKHERJEE HOUSE TO PCC ROAD AT GHUSKIRA |
120000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MOHAMAYA MUKHERJEE HOUSE TO PCC ROAD AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.440216,24.440216
Longitude : 87.8562584,87.8562584
file name : Image_28012022142632877.png
|
2022-01-28 14:26:32.971784 |
427 |
47147421 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM UTTAM HOUSE TO PANDULAGA AT KESTARA |
200000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM UTTAM HOUSE TO PANDULAGA AT KESTARA 1 |
Completion of work |
-
latitude : 24.4222438,24.4222438
Longitude : 87.8605814,87.8605814
file name : Image_28012022135933805.png
|
2022-01-28 13:59:33.918066 |
428 |
47147421 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM UTTAM HOUSE TO PANDULAGA AT KESTARA |
200000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM UTTAM HOUSE TO PANDULAGA AT KESTARA 1 |
Completion of work |
-
latitude : 24.4222438,24.4222438
Longitude : 87.8605814,87.8605814
file name : Image_28012022135930911.png
|
2022-01-28 13:59:31.033181 |
429 |
47147421 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM UTTAM HOUSE TO PANDULAGA AT KESTARA |
200000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM UTTAM HOUSE TO PANDULAGA AT KESTARA 1 |
Completion of work |
-
latitude : 24.4222438,24.4222438
Longitude : 87.8605814,87.8605814
file name : Image_28012022114640240.png
|
2022-01-28 11:46:40.362747 |
430 |
47147421 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM UTTAM HOUSE TO PANDULAGA AT KESTARA |
200000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM UTTAM HOUSE TO PANDULAGA AT KESTARA 1 |
Completion of work |
-
latitude : 24.4222438,24.4222438
Longitude : 87.8605814,87.8605814
file name : Image_28012022135927975.png
|
2022-01-28 13:59:28.09095 |
431 |
47148416 |
CONST OF CONCRETE ROAD FROM NIRMAL CHATTERJEE TO SUNIL RABIDAS HOUSE VIA PITOR DAS TO MOHON DAS HOUS |
200000 |
CONST OF CONCRETE ROAD FROM NIRMAL CHATTERJEE TO SUNIL RABIDAS HOUSE VIA PITOR DAS TO MOHON DAS HOUS |
Completion of work |
-
latitude : 24.457514999999997,24.457525
Longitude : 87.85650833333332,87.85637833333334
file name : Image_19022022135253202.png
|
2022-02-19 13:52:53.325169 |
432 |
47148416 |
CONST OF CONCRETE ROAD FROM NIRMAL CHATTERJEE TO SUNIL RABIDAS HOUSE VIA PITOR DAS TO MOHON DAS HOUS |
200000 |
CONST OF CONCRETE ROAD FROM NIRMAL CHATTERJEE TO SUNIL RABIDAS HOUSE VIA PITOR DAS TO MOHON DAS HOUS |
Completion of work |
-
latitude : 24.457555000000003,24.457514999999997
Longitude : 87.85616333333334,87.85616666666668
file name : Image_10022022141402507.png
|
2022-02-10 14:14:02.618407 |
433 |
47148416 |
CONST OF CONCRETE ROAD FROM NIRMAL CHATTERJEE TO SUNIL RABIDAS HOUSE VIA PITOR DAS TO MOHON DAS HOUS |
200000 |
CONST OF CONCRETE ROAD FROM NIRMAL CHATTERJEE TO SUNIL RABIDAS HOUSE VIA PITOR DAS TO MOHON DAS HOUS |
Completion of work |
-
latitude : 24.457544999999996,24.457526666666663
Longitude : 87.85637666666668,87.85640833333333
file name : Image_19022022135350603.png
|
2022-02-19 13:53:50.744854 |
434 |
47148548 |
CONST OF CONCRETE ROAD FROM PITCH ROAD TO RAJA PUKUR AND PITCH ROAD TO JAHANGIR HOUSE AT DHITORA |
61860 |
CONST OF CONCRETE ROAD FROM PITCH ROAD TO RAJA PUKUR AND PITCH ROAD TO JAHANGIR HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.45534,24.455423333333336,24.455541666666665
Longitude : 87.84702833333334,87.847055,87.84723166666666
file name : Image_10032022145646995.png
|
2022-03-10 14:56:47.136344 |
435 |
47148548 |
CONST OF CONCRETE ROAD FROM PITCH ROAD TO RAJA PUKUR AND PITCH ROAD TO JAHANGIR HOUSE AT DHITORA |
61860 |
CONST OF CONCRETE ROAD FROM PITCH ROAD TO RAJA PUKUR AND PITCH ROAD TO JAHANGIR HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.455655,24.455656666666663
Longitude : 87.84715999999999,87.84717666666666
file name : Image_10032022145650330.png
|
2022-03-10 14:56:50.442653 |
436 |
47148548 |
CONST OF CONCRETE ROAD FROM PITCH ROAD TO RAJA PUKUR AND PITCH ROAD TO JAHANGIR HOUSE AT DHITORA |
61860 |
CONST OF CONCRETE ROAD FROM PITCH ROAD TO RAJA PUKUR AND PITCH ROAD TO JAHANGIR HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.455166666666667,24.45512833333333
Longitude : 87.84716666666667,87.84717500000001
file name : Image_10032022145654086.png
|
2022-03-10 14:56:54.19799 |
437 |
47148548 |
CONST OF CONCRETE ROAD FROM PITCH ROAD TO RAJA PUKUR AND PITCH ROAD TO JAHANGIR HOUSE AT DHITORA |
61860 |
CONST OF CONCRETE ROAD FROM PITCH ROAD TO RAJA PUKUR AND PITCH ROAD TO JAHANGIR HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.45517,24.455195000000003
Longitude : 87.84738333333334,87.84718833333334
file name : Image_10032022145657815.png
|
2022-03-10 14:56:57.929612 |
438 |
47148548 |
CONST OF CONCRETE ROAD FROM PITCH ROAD TO RAJA PUKUR AND PITCH ROAD TO JAHANGIR HOUSE AT DHITORA |
61860 |
CONST OF CONCRETE ROAD FROM PITCH ROAD TO RAJA PUKUR AND PITCH ROAD TO JAHANGIR HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.455655,24.455656666666663
Longitude : 87.84715999999999,87.84717666666666
file name : Image_10032022145715018.png
|
2022-03-10 14:57:15.123651 |
439 |
47148548 |
CONST OF CONCRETE ROAD FROM PITCH ROAD TO RAJA PUKUR AND PITCH ROAD TO JAHANGIR HOUSE AT DHITORA |
61860 |
CONST OF CONCRETE ROAD FROM PITCH ROAD TO RAJA PUKUR AND PITCH ROAD TO JAHANGIR HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.455166666666667,24.45512833333333
Longitude : 87.84716666666667,87.84717500000001
file name : Image_10032022145718300.png
|
2022-03-10 14:57:18.407457 |
440 |
47148548 |
CONST OF CONCRETE ROAD FROM PITCH ROAD TO RAJA PUKUR AND PITCH ROAD TO JAHANGIR HOUSE AT DHITORA |
61860 |
CONST OF CONCRETE ROAD FROM PITCH ROAD TO RAJA PUKUR AND PITCH ROAD TO JAHANGIR HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.45517,24.455195000000003
Longitude : 87.84738333333334,87.84718833333334
file name : Image_10032022145722823.png
|
2022-03-10 14:57:22.932147 |
441 |
47148592 |
CONST OF CONCRETE ROAD FROM MUKTAR HOUSE TO JAHIR SK HOUSE AT DHITORA |
240000 |
CONST OF CONCRETE ROAD FROM MUKTAR HOUSE TO JAHIR SK HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.4549247,24.4549238
Longitude : 87.8479256,87.8479268
file name : Image_15022022133834040.png
|
2022-02-15 13:38:34.146954 |
442 |
47148592 |
CONST OF CONCRETE ROAD FROM MUKTAR HOUSE TO JAHIR SK HOUSE AT DHITORA |
240000 |
CONST OF CONCRETE ROAD FROM MUKTAR HOUSE TO JAHIR SK HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.4549238,24.4549238
Longitude : 87.8479268,87.8479268
file name : Image_15022022134053914.png
|
2022-02-15 13:40:54.012078 |
443 |
47148592 |
CONST OF CONCRETE ROAD FROM MUKTAR HOUSE TO JAHIR SK HOUSE AT DHITORA |
240000 |
CONST OF CONCRETE ROAD FROM MUKTAR HOUSE TO JAHIR SK HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.4402523,24.4402523
Longitude : 87.8563902,87.8563902
file name : Image_11022022150016685.png
|
2022-02-11 15:00:16.786797 |
444 |
47149023 |
CONST OF CONCRETE ROAD FROM KALU SK TO JANEBAS VIA TAJEL SK TO MOSTAFA SK AND MANNAN SK TO PARVIN HO |
250000 |
CONST OF CONCRETE ROAD FROM KALU SK TO JANEBAS VIA TAJEL SK TO MOSTAFA SK AND MANNAN SK TO PARVIN HO |
Completion of work |
-
latitude : 24.4419396,24.4419396
Longitude : 87.846563,87.846563
file name : Image_15022022133450742.png
|
2022-02-15 13:34:50.844444 |
445 |
47149023 |
CONST OF CONCRETE ROAD FROM KALU SK TO JANEBAS VIA TAJEL SK TO MOSTAFA SK AND MANNAN SK TO PARVIN HO |
250000 |
CONST OF CONCRETE ROAD FROM KALU SK TO JANEBAS VIA TAJEL SK TO MOSTAFA SK AND MANNAN SK TO PARVIN HO |
Completion of work |
-
latitude : 24.4419396,24.4419396
Longitude : 87.846563,87.846563
file name : Image_15022022133455284.png
|
2022-02-15 13:34:55.378501 |
446 |
47149023 |
CONST OF CONCRETE ROAD FROM KALU SK TO JANEBAS VIA TAJEL SK TO MOSTAFA SK AND MANNAN SK TO PARVIN HO |
250000 |
CONST OF CONCRETE ROAD FROM KALU SK TO JANEBAS VIA TAJEL SK TO MOSTAFA SK AND MANNAN SK TO PARVIN HO |
Completion of work |
-
latitude : 24.4419396,24.4419396
Longitude : 87.846563,87.846563
file name : Image_15022022124212166.png
|
2022-02-15 12:42:12.283816 |
447 |
47158477 |
CONST OF CONCRETE ROAD FROM PCC ROAD TO SWAPAN MAL HOUSE AT BHADISWAR |
230000 |
CONST OF CONCRETE ROAD FROM PCC ROAD TO SWAPAN MAL HOUSE AT BHADISWAR1 |
Completion of work |
-
latitude : 24.439971666666665,24.440305
Longitude : 87.86313999999999,87.86322999999999
file name : Image_03032022160025502.png
|
2022-03-03 16:00:25.623078 |
448 |
47158477 |
CONST OF CONCRETE ROAD FROM PCC ROAD TO SWAPAN MAL HOUSE AT BHADISWAR |
230000 |
CONST OF CONCRETE ROAD FROM PCC ROAD TO SWAPAN MAL HOUSE AT BHADISWAR1 |
Completion of work |
-
latitude : 24.4396784,24.4396781
Longitude : 87.8633534,87.8633723
file name : Image_03032022155924999.png
|
2022-03-03 15:59:25.131276 |
449 |
47158477 |
CONST OF CONCRETE ROAD FROM PCC ROAD TO SWAPAN MAL HOUSE AT BHADISWAR |
230000 |
CONST OF CONCRETE ROAD FROM PCC ROAD TO SWAPAN MAL HOUSE AT BHADISWAR1 |
Completion of work |
-
latitude : 24.440338333333337,24.440805
Longitude : 87.86321500000001,87.86322166666666
file name : Image_03032022160158007.png
|
2022-03-03 16:01:58.11507 |
450 |
47158477 |
CONST OF CONCRETE ROAD FROM PCC ROAD TO SWAPAN MAL HOUSE AT BHADISWAR |
230000 |
CONST OF CONCRETE ROAD FROM PCC ROAD TO SWAPAN MAL HOUSE AT BHADISWAR1 |
Completion of work |
-
latitude : 24.44085166666667,24.44040166666667
Longitude : 87.86342333333332,87.86314499999999
file name : Image_03032022160402330.png
|
2022-03-03 16:04:02.429392 |
451 |
34345431 |
UPGRADATION OF PCC ROAD FROM NURUL ISLAM HOUSE TO MUNTU SK HOUSE AT DHITORA |
100000 |
UPGRADATION OF PCC ROAD FROM NURUL ISLAM HOUSE TO MUNTU SK HOUSE AT DHITORA1 |
Plinth level |
-
latitude : 24.45386488,24.45386484
Longitude : 87.84835788,87.84835777
file name : Image_08012021140952976.png
|
2021-01-08 14:09:53.051166 |
452 |
34345431 |
UPGRADATION OF PCC ROAD FROM NURUL ISLAM HOUSE TO MUNTU SK HOUSE AT DHITORA |
100000 |
UPGRADATION OF PCC ROAD FROM NURUL ISLAM HOUSE TO MUNTU SK HOUSE AT DHITORA1 |
Plinth level |
-
latitude : 24.4538309,24.45382258
Longitude : 87.84834185,87.84835083
file name : Image_08012021135733957.png
|
2021-01-08 13:57:34.062777 |
453 |
34345431 |
UPGRADATION OF PCC ROAD FROM NURUL ISLAM HOUSE TO MUNTU SK HOUSE AT DHITORA |
100000 |
UPGRADATION OF PCC ROAD FROM NURUL ISLAM HOUSE TO MUNTU SK HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.45379074,24.45380724
Longitude : 87.84834945,87.84838722
file name : Image_19122020124831641.png
|
2020-12-19 12:48:31.736159 |
454 |
47163926 |
CONST OF CONCRETE ROAD FROM MOTI SK HOUSE TO EID GAHA AT GHUSKIRA |
230000 |
CONST OF CONCRETE ROAD FROM MOTI SK HOUSE TO EID GAHA AT GHUSKIRA |
Completion of work |
-
latitude : 24.439045000000004,24.439118333333333
Longitude : 87.86829833333334,87.86829166666666
file name : Image_29032022114225379.png
|
2022-03-29 11:42:25.501351 |
455 |
47163926 |
CONST OF CONCRETE ROAD FROM MOTI SK HOUSE TO EID GAHA AT GHUSKIRA |
230000 |
CONST OF CONCRETE ROAD FROM MOTI SK HOUSE TO EID GAHA AT GHUSKIRA |
Completion of work |
-
latitude : 24.439031666666665,24.438971666666664
Longitude : 87.86830666666668,87.86829333333331
file name : Image_29032022114056617.png
|
2022-03-29 11:40:56.739274 |
456 |
47163926 |
CONST OF CONCRETE ROAD FROM MOTI SK HOUSE TO EID GAHA AT GHUSKIRA |
230000 |
CONST OF CONCRETE ROAD FROM MOTI SK HOUSE TO EID GAHA AT GHUSKIRA |
Completion of work |
-
latitude : 24.438893333333333,24.438926666666664
Longitude : 87.86820166666666,87.86813333333333
file name : Image_29032022114139808.png
|
2022-03-29 11:41:39.916073 |
457 |
47163926 |
CONST OF CONCRETE ROAD FROM MOTI SK HOUSE TO EID GAHA AT GHUSKIRA |
230000 |
CONST OF CONCRETE ROAD FROM MOTI SK HOUSE TO EID GAHA AT GHUSKIRA |
Completion of work |
-
latitude : 24.421401666666664,24.421406666666666,24.421411666666668
Longitude : 87.85677,87.85685166666666,87.85695499999999
file name : Image_17032022123335890.png
|
2022-03-17 12:33:36.017252 |
458 |
47163049 |
CONST OF CONCRETE ROAD FROM KENARAM MUKHERJEE LAND TO GOLOK KONAI AND PCC ROAD TO SUPRABHAT PRAMANIK |
200000 |
CONST OF CONCRETE ROAD FROM KENARAM MUKHERJEE LAND TO GOLOK KONAI AND PCC ROAD TO SUPRABHAT PRAMANIK |
Completion of work |
-
latitude : 24.419441666666664,24.419451666666667
Longitude : 87.85460666666668,87.85466666666667
file name : Image_21032022112454080.png
|
2022-03-21 11:24:54.18112 |
459 |
47163049 |
CONST OF CONCRETE ROAD FROM KENARAM MUKHERJEE LAND TO GOLOK KONAI AND PCC ROAD TO SUPRABHAT PRAMANIK |
200000 |
CONST OF CONCRETE ROAD FROM KENARAM MUKHERJEE LAND TO GOLOK KONAI AND PCC ROAD TO SUPRABHAT PRAMANIK |
Completion of work |
-
latitude : 24.419441666666664,24.419451666666667
Longitude : 87.85460666666668,87.85466666666667
file name : Image_21032022112520426.png
|
2022-03-21 11:25:20.521658 |
460 |
47163049 |
CONST OF CONCRETE ROAD FROM KENARAM MUKHERJEE LAND TO GOLOK KONAI AND PCC ROAD TO SUPRABHAT PRAMANIK |
200000 |
CONST OF CONCRETE ROAD FROM KENARAM MUKHERJEE LAND TO GOLOK KONAI AND PCC ROAD TO SUPRABHAT PRAMANIK |
Completion of work |
-
latitude : 24.41946666666667,24.41945333333333
Longitude : 87.85477833333334,87.854685
file name : Image_21032022112459117.png
|
2022-03-21 11:24:59.224222 |
461 |
47163049 |
CONST OF CONCRETE ROAD FROM KENARAM MUKHERJEE LAND TO GOLOK KONAI AND PCC ROAD TO SUPRABHAT PRAMANIK |
200000 |
CONST OF CONCRETE ROAD FROM KENARAM MUKHERJEE LAND TO GOLOK KONAI AND PCC ROAD TO SUPRABHAT PRAMANIK |
Completion of work |
-
latitude : 24.420016666666665,24.420076666666667
Longitude : 87.85454166666665,87.85470833333332
file name : Image_21032022112503486.png
|
2022-03-21 11:25:03.581484 |
462 |
47163049 |
CONST OF CONCRETE ROAD FROM KENARAM MUKHERJEE LAND TO GOLOK KONAI AND PCC ROAD TO SUPRABHAT PRAMANIK |
200000 |
CONST OF CONCRETE ROAD FROM KENARAM MUKHERJEE LAND TO GOLOK KONAI AND PCC ROAD TO SUPRABHAT PRAMANIK |
Completion of work |
-
latitude : 24.420016666666665,24.420076666666667
Longitude : 87.85454166666665,87.85470833333332
file name : Image_21032022112529705.png
|
2022-03-21 11:25:29.795532 |
463 |
47163049 |
CONST OF CONCRETE ROAD FROM KENARAM MUKHERJEE LAND TO GOLOK KONAI AND PCC ROAD TO SUPRABHAT PRAMANIK |
200000 |
CONST OF CONCRETE ROAD FROM KENARAM MUKHERJEE LAND TO GOLOK KONAI AND PCC ROAD TO SUPRABHAT PRAMANIK |
Completion of work |
-
latitude : 24.41946666666667,24.41945333333333
Longitude : 87.85477833333334,87.854685
file name : Image_21032022112525191.png
|
2022-03-21 11:25:25.306682 |
464 |
47163049 |
CONST OF CONCRETE ROAD FROM KENARAM MUKHERJEE LAND TO GOLOK KONAI AND PCC ROAD TO SUPRABHAT PRAMANIK |
200000 |
CONST OF CONCRETE ROAD FROM KENARAM MUKHERJEE LAND TO GOLOK KONAI AND PCC ROAD TO SUPRABHAT PRAMANIK |
Completion of work |
-
latitude : 24.419375,24.41936333333333
Longitude : 87.85464500000002,87.85485666666666
file name : Image_03022022114821592.png
|
2022-02-03 11:48:21.708487 |
465 |
47147033 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM OKTIYA MASJID TO LOLITA GORA PUKUR AT DHITORA |
101387 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM OKTIYA MASJID TO LOLITA GORA PUKUR AT DHITORA |
Completion of work |
-
latitude : 24.4465593,24.4465593
Longitude : 87.8544213,87.8544213
file name : Image_14032022114930253.png
|
2022-03-14 11:49:30.366081 |
466 |
47147033 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM OKTIYA MASJID TO LOLITA GORA PUKUR AT DHITORA |
101387 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM OKTIYA MASJID TO LOLITA GORA PUKUR AT DHITORA |
Completion of work |
-
latitude : 24.4465593,24.4465593,24.4465593
Longitude : 87.8544213,87.8544213,87.8544213
file name : Image_14032022114705377.png
|
2022-03-14 11:47:05.503303 |
467 |
47147033 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM OKTIYA MASJID TO LOLITA GORA PUKUR AT DHITORA |
101387 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM OKTIYA MASJID TO LOLITA GORA PUKUR AT DHITORA |
Completion of work |
-
latitude : 24.4465593,24.4465593,24.4465593
Longitude : 87.8544213,87.8544213,87.8544213
file name : Image_14032022114829539.png
|
2022-03-14 11:48:29.660271 |
468 |
47148216 |
CONST OF STONE MARBLE FLOORING AND APPLIED OF DECORATIVE COLOUR PAINT INSIDE AND OUTSIDE OF THE MUKH |
250000 |
CONST OF STONE MARBLE FLOORING AND APPLIED OF DECORATIVE COLOUR PAINT INSIDE AND OUTSIDE OF THE MUKH |
Completion of work |
-
latitude : 24.438730000000003
Longitude : 87.87351333333332
file name : Image_09032022155207099.png
|
2022-03-09 15:52:07.228715 |
469 |
47148216 |
CONST OF STONE MARBLE FLOORING AND APPLIED OF DECORATIVE COLOUR PAINT INSIDE AND OUTSIDE OF THE MUKH |
250000 |
CONST OF STONE MARBLE FLOORING AND APPLIED OF DECORATIVE COLOUR PAINT INSIDE AND OUTSIDE OF THE MUKH |
Completion of work |
-
latitude : 24.438749999999995
Longitude : 87.87351833333332
file name : Image_09032022155254078.png
|
2022-03-09 15:52:54.187736 |
470 |
47148216 |
CONST OF STONE MARBLE FLOORING AND APPLIED OF DECORATIVE COLOUR PAINT INSIDE AND OUTSIDE OF THE MUKH |
250000 |
CONST OF STONE MARBLE FLOORING AND APPLIED OF DECORATIVE COLOUR PAINT INSIDE AND OUTSIDE OF THE MUKH |
Completion of work |
-
latitude : 24.43875666666667
Longitude : 87.87352333333335
file name : Image_09032022155343502.png
|
2022-03-09 15:53:43.609881 |
471 |
47147264 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB INCLUDING CALVERT FROM PITCH ROAD TO NIYAMAT SK HOUSE |
120588 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB INCLUDING CALVERT FROM PITCH ROAD TO NIYAMAT SK HOUSE |
Completion of work |
-
latitude : 24.439181,24.43918
Longitude : 87.8684731,87.8684691
file name : Image_28032022112350728.png
|
2022-03-28 11:23:50.826209 |
472 |
47147264 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB INCLUDING CALVERT FROM PITCH ROAD TO NIYAMAT SK HOUSE |
120588 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB INCLUDING CALVERT FROM PITCH ROAD TO NIYAMAT SK HOUSE |
Completion of work |
-
latitude : 24.4391817,24.4391817
Longitude : 87.8684735,87.8684735
file name : Image_28032022112433597.png
|
2022-03-28 11:24:33.700881 |
473 |
47147264 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB INCLUDING CALVERT FROM PITCH ROAD TO NIYAMAT SK HOUSE |
120588 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB INCLUDING CALVERT FROM PITCH ROAD TO NIYAMAT SK HOUSE |
Completion of work |
-
latitude : 24.439270000000004,24.439121666666665
Longitude : 87.86841333333332,87.8684
file name : Image_28032022112520480.png
|
2022-03-28 11:25:20.571355 |
474 |
46737997 |
RE SINKING OF TUBEWELL THROUGH THE SANSAD NO I to XXIV UNDER MURARAI GP |
200000 |
RE SINKING OF TUBEWELL THROUGH THE SANSAD NO I to XXIV UNDER MURARAI GP |
Completion of work |
-
latitude : 24.441096666666667
Longitude : 87.84970833333334
file name : Image_27042022123435002.png
|
2022-04-27 12:34:35.116208 |
475 |
46737997 |
RE SINKING OF TUBEWELL THROUGH THE SANSAD NO I to XXIV UNDER MURARAI GP |
200000 |
RE SINKING OF TUBEWELL THROUGH THE SANSAD NO I to XXIV UNDER MURARAI GP |
Completion of work |
-
latitude : 24.44109
Longitude : 87.84968500000001
file name : Image_27042022123531118.png
|
2022-04-27 12:35:31.24124 |
476 |
46737997 |
RE SINKING OF TUBEWELL THROUGH THE SANSAD NO I to XXIV UNDER MURARAI GP |
200000 |
RE SINKING OF TUBEWELL THROUGH THE SANSAD NO I to XXIV UNDER MURARAI GP |
Completion of work |
-
latitude : 24.441068333333337
Longitude : 87.84970166666666
file name : Image_27042022123615065.png
|
2022-04-27 12:36:15.178445 |
477 |
47115208 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM NEW SINKING TUBEWELL AT DADPUR MURARAI AND B |
99000 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM NEW SINKING TUBEWELL AT DADPUR MURARAI AND B |
Completion of work |
-
latitude : 24.4402711
Longitude : 87.8563436
file name : Image_28062022143203983.png
|
2022-06-28 14:32:04.103111 |
478 |
47115208 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM NEW SINKING TUBEWELL AT DADPUR MURARAI AND B |
99000 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM NEW SINKING TUBEWELL AT DADPUR MURARAI AND B |
Completion of work |
-
latitude : 24.4402711
Longitude : 87.8563436
file name : Image_28062022143209006.png
|
2022-06-28 14:32:09.112572 |
479 |
47115208 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM NEW SINKING TUBEWELL AT DADPUR MURARAI AND B |
99000 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM NEW SINKING TUBEWELL AT DADPUR MURARAI AND B |
Completion of work |
-
latitude : 24.4402723
Longitude : 87.8563369
file name : Image_28062022123612845.png
|
2022-06-28 12:36:12.965405 |
480 |
47147201 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB INSIDE OF CHILDREN PARK INCLUDING IRON NET FENCING THR |
220000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB INSIDE OF CHILDREN PARK INCLUDING IRON NET FENCING THR |
Completion of work |
-
latitude : 24.440949999999997,24.441118333333332
Longitude : 87.85636333333332,87.85634333333334
file name : Image_24052022151429578.png
|
2022-05-24 15:14:29.671856 |
481 |
47147201 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB INSIDE OF CHILDREN PARK INCLUDING IRON NET FENCING THR |
220000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB INSIDE OF CHILDREN PARK INCLUDING IRON NET FENCING THR |
Completion of work |
-
latitude : 24.441173333333335,24.441073333333332
Longitude : 87.856405,87.85638333333333
file name : Image_24052022152712226.png
|
2022-05-24 15:27:12.328713 |
482 |
47147201 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB INSIDE OF CHILDREN PARK INCLUDING IRON NET FENCING THR |
220000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB INSIDE OF CHILDREN PARK INCLUDING IRON NET FENCING THR |
Completion of work |
-
latitude : 24.441018333333332,24.440955
Longitude : 87.85637666666668,87.85635166666667
file name : Image_24052022152717523.png
|
2022-05-24 15:27:17.627745 |
483 |
47147201 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB INSIDE OF CHILDREN PARK INCLUDING IRON NET FENCING THR |
220000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB INSIDE OF CHILDREN PARK INCLUDING IRON NET FENCING THR |
Completion of work |
-
latitude : 24.441018333333332,24.440955
Longitude : 87.85637666666668,87.85635166666667
file name : Image_24052022152729804.png
|
2022-05-24 15:27:29.906512 |
484 |
47147054 |
CONST OF CONCRETE ROAD CAVERT INCLUDING SIDE DRAIN FROM SAHINA TO CHANDU HOUSE AT GD PARA |
99000 |
CONST OF CONCRETE ROAD CAVERT INCLUDING SIDE DRAIN FROM SAHINA TO CHANDU HOUSE AT GD PARA1 |
Completion of work |
-
latitude : 24.44345,24.443365000000004
Longitude : 87.85821166666668,87.85818499999999
file name : Image_26052022153412664.png
|
2022-05-26 15:34:12.767607 |
485 |
47147054 |
CONST OF CONCRETE ROAD CAVERT INCLUDING SIDE DRAIN FROM SAHINA TO CHANDU HOUSE AT GD PARA |
99000 |
CONST OF CONCRETE ROAD CAVERT INCLUDING SIDE DRAIN FROM SAHINA TO CHANDU HOUSE AT GD PARA1 |
Completion of work |
-
latitude : 24.443365000000004,24.443236666666667
Longitude : 87.85826666666665,87.85823666666666
file name : Image_26052022153216712.png
|
2022-05-26 15:32:16.82302 |
486 |
47147054 |
CONST OF CONCRETE ROAD CAVERT INCLUDING SIDE DRAIN FROM SAHINA TO CHANDU HOUSE AT GD PARA |
99000 |
CONST OF CONCRETE ROAD CAVERT INCLUDING SIDE DRAIN FROM SAHINA TO CHANDU HOUSE AT GD PARA1 |
Completion of work |
-
latitude : 24.44342166666667,24.443395000000002
Longitude : 87.858205,87.85815333333333
file name : Image_26052022153304142.png
|
2022-05-26 15:33:04.240648 |
487 |
56786955 |
CONS OF PCC ROAD FROM HO ABU BAKKAR TOWARDS NASIR VIA GOI AT DHITORA |
149980 |
CONS OF PCC ROAD FROM HO ABU BAKKAR TOWARDS NASIR VIA GOI AT DHITORA1 |
Roof laid |
-
latitude : 24.45688803,24.45693962
Longitude : 87.84860307,87.8486105
file name : Image_10042023123317036.png
|
2023-04-10 12:33:17.153024 |
488 |
56786955 |
CONS OF PCC ROAD FROM HO ABU BAKKAR TOWARDS NASIR VIA GOI AT DHITORA |
149980 |
CONS OF PCC ROAD FROM HO ABU BAKKAR TOWARDS NASIR VIA GOI AT DHITORA1 |
Plinth level |
-
latitude : 24.45705044,24.45705467,24.45703306
Longitude : 87.84853493,87.84854558,87.84853118
file name : Image_06042023112023118.png
|
2023-04-06 11:20:23.2295 |
489 |
56786955 |
CONS OF PCC ROAD FROM HO ABU BAKKAR TOWARDS NASIR VIA GOI AT DHITORA |
149980 |
CONS OF PCC ROAD FROM HO ABU BAKKAR TOWARDS NASIR VIA GOI AT DHITORA1 |
Completion of work |
-
latitude : 24.45694539,24.45698437
Longitude : 87.84850945,87.8485075
file name : Image_06042023111414673.png
|
2023-04-06 11:14:14.769087 |
490 |
56635883 |
INSTALLATION SUBMARSIBLE PUMP WITH PIPE LINE INCL WAITING SHED NEAR DURGA MANDIR AT MURARAI |
100000 |
INSTALLATION SUBMARSIBLE PUMP WITH PIPE LINE INCL WAITING SHED NEAR DURGA MANDIR AT MURARAI1 |
Roof laid |
-
latitude : 24.4398546
Longitude : 87.8537812
file name : Image_28032023123105444.png
|
2023-03-28 12:31:05.562948 |
491 |
56635883 |
INSTALLATION SUBMARSIBLE PUMP WITH PIPE LINE INCL WAITING SHED NEAR DURGA MANDIR AT MURARAI |
100000 |
INSTALLATION SUBMARSIBLE PUMP WITH PIPE LINE INCL WAITING SHED NEAR DURGA MANDIR AT MURARAI1 |
Plinth level |
-
latitude : 24.440008
Longitude : 87.8550505
file name : Image_28032023122537200.png
|
2023-03-28 12:25:37.813504 |
492 |
56635883 |
INSTALLATION SUBMARSIBLE PUMP WITH PIPE LINE INCL WAITING SHED NEAR DURGA MANDIR AT MURARAI |
100000 |
INSTALLATION SUBMARSIBLE PUMP WITH PIPE LINE INCL WAITING SHED NEAR DURGA MANDIR AT MURARAI1 |
Completion of work |
-
latitude : 24.4398858
Longitude : 87.8539032
file name : Image_27032023142746357.png
|
2023-03-27 14:27:46.447253 |
493 |
56890100 |
CONS OF PCC ROAD FROM HO RASID TOWARDS SUK MD AT MOHULLA DANGA |
149887 |
CONS OF PCC ROAD FROM HO RASID TOWARDS SUK MD AT MOHULLA DANGA1 |
Roof laid |
-
latitude : 24.44051237,24.44051374
Longitude : 87.84449523,87.84449572
file name : Image_28032023152147057.png
|
2023-03-28 15:21:47.16714 |
494 |
56890100 |
CONS OF PCC ROAD FROM HO RASID TOWARDS SUK MD AT MOHULLA DANGA |
149887 |
CONS OF PCC ROAD FROM HO RASID TOWARDS SUK MD AT MOHULLA DANGA1 |
Plinth level |
-
latitude : 24.44050928,24.44051026
Longitude : 87.84448961,87.84449801
file name : Image_28032023151934750.png
|
2023-03-28 15:19:34.864922 |
495 |
56890100 |
CONS OF PCC ROAD FROM HO RASID TOWARDS SUK MD AT MOHULLA DANGA |
149887 |
CONS OF PCC ROAD FROM HO RASID TOWARDS SUK MD AT MOHULLA DANGA1 |
Completion of work |
-
latitude : 24.4398665,24.44049425
Longitude : 87.8532873,87.8445144
file name : Image_28032023151718580.png
|
2023-03-28 15:17:18.684215 |
496 |
57877387 |
CONS OF PCC ROAD FROM HO PCC TOWARDS FIRU MAL AT GHUSKIRA |
129936 |
CONS OF PCC ROAD FROM HO PCC TOWARDS FIRU MAL AT GHUSKIRA1 |
Roof laid |
-
latitude : 24.42016399,24.42013633
Longitude : 87.85376895,87.85378596
file name : Image_28032023160107201.png
|
2023-03-28 16:01:07.331082 |
497 |
57877387 |
CONS OF PCC ROAD FROM HO PCC TOWARDS FIRU MAL AT GHUSKIRA |
129936 |
CONS OF PCC ROAD FROM HO PCC TOWARDS FIRU MAL AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.42009851,24.42019888
Longitude : 87.85382761,87.85382143
file name : Image_28032023155816025.png
|
2023-03-28 15:58:16.131889 |
498 |
57877387 |
CONS OF PCC ROAD FROM HO PCC TOWARDS FIRU MAL AT GHUSKIRA |
129936 |
CONS OF PCC ROAD FROM HO PCC TOWARDS FIRU MAL AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.42025006,24.42021616
Longitude : 87.85379641,87.85382477
file name : Image_28032023155136222.png
|
2023-03-28 15:51:36.361207 |
499 |
56643547 |
CONS PUCCA DRAIN INC PCC ROAD FROM HO KARIM TOWARDS PITCH ROAD AT BHADISWAR |
199573 |
CONS PUCCA DRAIN INC PCC ROAD FROM HO KARIM TOWARDS PITCH ROAD AT BHADISWAR1 |
Plinth level |
-
latitude : 24.43978487,24.43978497,24.43978494
Longitude : 87.86248625,87.8624862,87.86248558
file name : Image_06042023121954633.png
|
2023-04-06 12:19:54.723081 |
500 |
56643547 |
CONS PUCCA DRAIN INC PCC ROAD FROM HO KARIM TOWARDS PITCH ROAD AT BHADISWAR |
199573 |
CONS PUCCA DRAIN INC PCC ROAD FROM HO KARIM TOWARDS PITCH ROAD AT BHADISWAR1 |
Completion of work |
-
latitude : 24.4396437,24.4396434,24.43977488
Longitude : 87.8625457,87.8625226,87.86245438
file name : Image_06042023121603614.png
|
2023-04-06 12:16:03.691352 |
501 |
57864597 |
CONS OF PCC ROAD FROM HO KAYAMUDDIN TOWARDS SAMAD AT BHADISWAR |
79962 |
CONS OF PCC ROAD FROM HO KAYAMUDDIN TOWARDS SAMAD AT BHADISWAR1 |
Roof laid |
-
latitude : 24.43883326,24.43884212,24.4391938
Longitude : 87.86611488,87.86611028,87.8661352
file name : Image_10042023112324679.png
|
2023-04-10 11:23:24.757892 |
502 |
57864597 |
CONS OF PCC ROAD FROM HO KAYAMUDDIN TOWARDS SAMAD AT BHADISWAR |
79962 |
CONS OF PCC ROAD FROM HO KAYAMUDDIN TOWARDS SAMAD AT BHADISWAR1 |
Plinth level |
-
latitude : 24.43881986,24.4391938,24.43882953
Longitude : 87.8661215,87.8661352,87.86607506
file name : Image_10042023111943107.png
|
2023-04-10 11:19:43.199199 |
503 |
57864597 |
CONS OF PCC ROAD FROM HO KAYAMUDDIN TOWARDS SAMAD AT BHADISWAR |
79962 |
CONS OF PCC ROAD FROM HO KAYAMUDDIN TOWARDS SAMAD AT BHADISWAR1 |
Completion of work |
-
latitude : 24.43886128,24.43887695,24.43888369
Longitude : 87.86609477,87.86609484,87.86608592
file name : Image_10042023111503186.png
|
2023-04-10 11:15:03.281365 |
504 |
56903464 |
CONST OF PCC ROAD FROM NAGORI TO PADDO AT GOPALPUR |
99986 |
CONST OF PCC ROAD FROM NAGORI TO PADDO AT GOPALPUR1 |
Roof laid |
-
latitude : 24.43386296,24.43382726
Longitude : 87.870293,87.87030307
file name : Image_12042023120020472.png
|
2023-04-12 12:00:20.799794 |
505 |
56903464 |
CONST OF PCC ROAD FROM NAGORI TO PADDO AT GOPALPUR |
99986 |
CONST OF PCC ROAD FROM NAGORI TO PADDO AT GOPALPUR1 |
Plinth level |
-
latitude : 24.43382868,24.43380605,24.4341425
Longitude : 87.87031049,87.8703206,87.8706189
file name : Image_12042023115811242.png
|
2023-04-12 11:58:11.338845 |
506 |
56903464 |
CONST OF PCC ROAD FROM NAGORI TO PADDO AT GOPALPUR |
99986 |
CONST OF PCC ROAD FROM NAGORI TO PADDO AT GOPALPUR1 |
Completion of work |
-
latitude : 24.43387822,24.43388045
Longitude : 87.87038455,87.87038253
file name : Image_31032023145844882.png
|
2023-03-31 14:58:44.996898 |
507 |
56787109 |
CONS OF PCC ROAD FROM HO ASRAF TO OSMAN AND SAMIR TO TUNU SK AT GD PARA |
119895 |
CONS OF PCC ROAD FROM HO ASRAF TO OSMAN AND SAMIR TO TUNU SK AT GD PARA1 |
Plinth level |
-
latitude : 24.44676929,24.44676798,24.44676663
Longitude : 87.857723,87.85772005,87.85771998
file name : Image_12042023122159475.png
|
2023-04-12 12:21:59.607813 |
508 |
56787109 |
CONS OF PCC ROAD FROM HO ASRAF TO OSMAN AND SAMIR TO TUNU SK AT GD PARA |
119895 |
CONS OF PCC ROAD FROM HO ASRAF TO OSMAN AND SAMIR TO TUNU SK AT GD PARA1 |
Completion of work |
-
latitude : 24.44663733,24.44663702,24.44661941
Longitude : 87.85742009,87.85742035,87.85739679
file name : Image_10042023115304610.png
|
2023-04-10 11:53:04.703527 |
509 |
56633557 |
CONS DRAIN INCL PCC ROAD FROM HO KAREMUL TO MASJID AT G D PARA |
149893 |
CONS DRAIN INCL PCC ROAD FROM HO KAREMUL TO MASJID AT G D PARA1 |
Completion of work |
-
latitude : 24.44476222,24.44476232,24.44477916
Longitude : 87.85771016,87.85770989,87.85770443
file name : Image_10042023123218270.png
|
2023-04-10 12:32:18.37264 |
510 |
56633557 |
CONS DRAIN INCL PCC ROAD FROM HO KAREMUL TO MASJID AT G D PARA |
149893 |
CONS DRAIN INCL PCC ROAD FROM HO KAREMUL TO MASJID AT G D PARA1 |
Completion of work |
-
latitude : 24.44482936,24.44483122
Longitude : 87.85770225,87.85770037
file name : Image_10042023123223753.png
|
2023-04-10 12:32:23.896318 |
511 |
56633557 |
CONS DRAIN INCL PCC ROAD FROM HO KAREMUL TO MASJID AT G D PARA |
149893 |
CONS DRAIN INCL PCC ROAD FROM HO KAREMUL TO MASJID AT G D PARA1 |
Completion of work |
-
latitude : 24.44482936,24.44483122
Longitude : 87.85770225,87.85770037
file name : Image_10042023123306832.png
|
2023-04-10 12:33:06.957709 |
512 |
56786920 |
CONS OF PCC ROAD FROM HO SAJAHAN TOWARDS MOIJUDDIN MIR AT DHITORA |
99891 |
CONS OF PCC ROAD FROM HO SAJAHAN TOWARDS MOIJUDDIN MIR AT DHITORA1 |
Plinth level |
-
latitude : 24.45925345,24.4592825,24.45926933
Longitude : 87.84967307,87.84967324,87.84967765
file name : Image_13042023111855889.png
|
2023-04-13 11:18:55.975351 |
513 |
56786920 |
CONS OF PCC ROAD FROM HO SAJAHAN TOWARDS MOIJUDDIN MIR AT DHITORA |
99891 |
CONS OF PCC ROAD FROM HO SAJAHAN TOWARDS MOIJUDDIN MIR AT DHITORA1 |
Completion of work |
-
latitude : 24.4587375,24.4587375
Longitude : 87.8492969,87.8492969
file name : Image_12042023124518397.png
|
2023-04-12 12:45:18.51901 |
514 |
56674048 |
CONS PUCCA DRAIN INC PCC ROAD FROM HO HAIDAR TOWARDS UMMAR AT DADPUR |
199948 |
CONS PUCCA DRAIN INC PCC ROAD FROM HO HAIDAR TOWARDS UMMAR AT DADPUR1 |
Roof laid |
-
latitude : 24.41170507,24.41178734,24.41178523
Longitude : 87.86056934,87.86057442,87.86056992
file name : Image_18042023114059998.png
|
2023-04-18 11:41:00.111766 |
515 |
56674048 |
CONS PUCCA DRAIN INC PCC ROAD FROM HO HAIDAR TOWARDS UMMAR AT DADPUR |
199948 |
CONS PUCCA DRAIN INC PCC ROAD FROM HO HAIDAR TOWARDS UMMAR AT DADPUR1 |
Plinth level |
-
latitude : 24.41173448,24.41173662,24.41173939
Longitude : 87.86060686,87.86059549,87.86058407
file name : Image_18042023113804136.png
|
2023-04-18 11:38:04.261455 |
516 |
56674048 |
CONS PUCCA DRAIN INC PCC ROAD FROM HO HAIDAR TOWARDS UMMAR AT DADPUR |
199948 |
CONS PUCCA DRAIN INC PCC ROAD FROM HO HAIDAR TOWARDS UMMAR AT DADPUR1 |
Completion of work |
-
latitude : 24.41228772,24.4122947,24.41229371
Longitude : 87.86017131,87.86017557,87.86017083
file name : Image_04042023131445641.png
|
2023-04-04 13:14:45.730945 |
517 |
57879564 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO MAJIB TOWARDS FULAL AT GHUSKIRA |
99949 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO MAJIB TOWARDS FULAL AT GHUSKIRA1 |
Roof laid |
-
latitude : 24.41694104,24.41694704,24.4169435
Longitude : 87.8579758,87.85796029,87.85794567
file name : Image_12042023113103035.png
|
2023-04-12 11:31:03.149746 |
518 |
57879564 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO MAJIB TOWARDS FULAL AT GHUSKIRA |
99949 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO MAJIB TOWARDS FULAL AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.41696555,24.41690617,24.4169305
Longitude : 87.8579734,87.85795371,87.85794711
file name : Image_12042023112831726.png
|
2023-04-12 11:28:31.83188 |
519 |
57879564 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO MAJIB TOWARDS FULAL AT GHUSKIRA |
99949 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO MAJIB TOWARDS FULAL AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41702039,24.41699688,24.41699202
Longitude : 87.85776756,87.85775323,87.85774636
file name : Image_04042023123637971.png
|
2023-04-04 12:36:38.060477 |
520 |
47147321 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM DULAL KALI DAS TO MADHAI RAJBANSHI HOUSE AT GOPAL |
160000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM DULAL KALI DAS TO MADHAI RAJBANSHI HOUSE AT GOPAL |
Completion of work |
-
latitude : 24.434123333333332,24.434093333333333,24.434126666666664
Longitude : 87.86767,87.86773999999998,87.86767333333334
file name : Image_30082022130131842.png
|
2022-08-30 13:01:31.928669 |
521 |
47147321 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM DULAL KALI DAS TO MADHAI RAJBANSHI HOUSE AT GOPAL |
160000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM DULAL KALI DAS TO MADHAI RAJBANSHI HOUSE AT GOPAL |
Completion of work |
-
latitude : 24.434293333333336,24.43409166666667
Longitude : 87.86719999999998,87.86775333333331
file name : Image_30082022130134846.png
|
2022-08-30 13:01:34.926363 |
522 |
47147321 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM DULAL KALI DAS TO MADHAI RAJBANSHI HOUSE AT GOPAL |
160000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM DULAL KALI DAS TO MADHAI RAJBANSHI HOUSE AT GOPAL |
Completion of work |
-
latitude : 24.434156666666663,24.434158333333336
Longitude : 87.86756833333332,87.86751666666666
file name : Image_30082022130137746.png
|
2022-08-30 13:01:37.82956 |
523 |
47147321 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM DULAL KALI DAS TO MADHAI RAJBANSHI HOUSE AT GOPAL |
160000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM DULAL KALI DAS TO MADHAI RAJBANSHI HOUSE AT GOPAL |
Completion of work |
-
latitude : 24.434293333333336,24.43409166666667
Longitude : 87.86719999999998,87.86775333333331
file name : Image_30082022130140617.png
|
2022-08-30 13:01:40.698076 |
524 |
47147321 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM DULAL KALI DAS TO MADHAI RAJBANSHI HOUSE AT GOPAL |
160000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM DULAL KALI DAS TO MADHAI RAJBANSHI HOUSE AT GOPAL |
Completion of work |
-
latitude : 24.434156666666663,24.434158333333336
Longitude : 87.86756833333332,87.86751666666666
file name : Image_30082022130144700.png
|
2022-08-30 13:01:44.786088 |
525 |
56643867 |
CONS OF COVER SLAB ON EXISTING PUCCA DRAIN INCL PCC ROAD FROM JUMMA MASJID WEST TO NORTH SIDE AT BHA |
149971 |
CONS OF COVER SLAB ON EXISTING PUCCA DRAIN INCL PCC ROAD FROM JUMMA MASJID WEST TO NORTH SIDE AT BHA1 |
Roof laid |
-
latitude : 24.4394547,24.439493
Longitude : 87.8616995,87.8617125
file name : Image_04052023114120102.png
|
2023-05-04 11:41:20.211829 |
526 |
56643867 |
CONS OF COVER SLAB ON EXISTING PUCCA DRAIN INCL PCC ROAD FROM JUMMA MASJID WEST TO NORTH SIDE AT BHA |
149971 |
CONS OF COVER SLAB ON EXISTING PUCCA DRAIN INCL PCC ROAD FROM JUMMA MASJID WEST TO NORTH SIDE AT BHA1 |
Plinth level |
-
latitude : 24.4394804,24.4407687,24.43968641,24.43968794
Longitude : 87.8617855,87.8646426,87.86181197,87.86180463
file name : Image_20042023131134838.png
|
2023-04-20 13:11:34.933685 |
527 |
56643867 |
CONS OF COVER SLAB ON EXISTING PUCCA DRAIN INCL PCC ROAD FROM JUMMA MASJID WEST TO NORTH SIDE AT BHA |
149971 |
CONS OF COVER SLAB ON EXISTING PUCCA DRAIN INCL PCC ROAD FROM JUMMA MASJID WEST TO NORTH SIDE AT BHA1 |
Completion of work |
-
latitude : 24.4394596,24.4394639,24.4394674
Longitude : 87.8617104,87.8617141,87.861726
file name : Image_18042023120909579.png
|
2023-04-18 12:09:09.689823 |
528 |
47147038 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM SENTU SK TO HOSSAIN SK HOUSE AT DHITORA |
90000 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM SENTU SK TO HOSSAIN SK HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.4570442,24.4570442
Longitude : 87.8578573,87.8578573
file name : Image_31082022163753759.png
|
2022-08-31 16:37:53.856178 |
529 |
47147038 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM SENTU SK TO HOSSAIN SK HOUSE AT DHITORA |
90000 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM SENTU SK TO HOSSAIN SK HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.4570442,24.4570442
Longitude : 87.8578573,87.8578573
file name : Image_31082022163756617.png
|
2022-08-31 16:37:56.709854 |
530 |
47147038 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM SENTU SK TO HOSSAIN SK HOUSE AT DHITORA |
90000 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM SENTU SK TO HOSSAIN SK HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.4570442,24.4570442
Longitude : 87.8578573,87.8578573
file name : Image_31082022163800613.png
|
2022-08-31 16:38:00.706213 |
531 |
47147048 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BORO JUMMA MASJID TO PITCH ROAD AT PANIARA |
80000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BORO JUMMA MASJID TO PITCH ROAD AT PANIARA1 |
Completion of work |
-
latitude : 24.4402643,24.4402643
Longitude : 87.8563348,87.8563348
file name : Image_12082022173557129.png
|
2022-08-12 17:35:57.239764 |
532 |
47147048 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BORO JUMMA MASJID TO PITCH ROAD AT PANIARA |
80000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BORO JUMMA MASJID TO PITCH ROAD AT PANIARA1 |
Completion of work |
-
latitude : 24.4402643,24.4402643
Longitude : 87.8563348,87.8563348
file name : Image_12082022134448947.png
|
2022-08-12 13:44:49.04958 |
533 |
47147048 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BORO JUMMA MASJID TO PITCH ROAD AT PANIARA |
80000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BORO JUMMA MASJID TO PITCH ROAD AT PANIARA1 |
Completion of work |
-
latitude : 24.4402643,24.4402643
Longitude : 87.8563348,87.8563348
file name : Image_12082022134412994.png
|
2022-08-12 13:44:13.10011 |
534 |
47147048 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BORO JUMMA MASJID TO PITCH ROAD AT PANIARA |
80000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BORO JUMMA MASJID TO PITCH ROAD AT PANIARA1 |
Completion of work |
-
latitude : 24.4402643,24.4402643
Longitude : 87.8563348,87.8563348
file name : Image_12082022134238341.png
|
2022-08-12 13:42:38.452994 |
535 |
47147226 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MANOJ SARKAR HOUSE TO KARTICK TOLA AT BHADISWAR |
101452 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MANOJ SARKAR HOUSE TO KARTICK TOLA AT BHADISWAR1 |
Completion of work |
-
latitude : 24.4413531,24.4413531
Longitude : 87.8647231,87.8647231
file name : Image_21032022173454368.png
|
2022-03-21 17:34:54.464935 |
536 |
47147226 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MANOJ SARKAR HOUSE TO KARTICK TOLA AT BHADISWAR |
101452 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MANOJ SARKAR HOUSE TO KARTICK TOLA AT BHADISWAR1 |
Completion of work |
-
latitude : 24.4413531,24.4413531
Longitude : 87.8647231,87.8647231
file name : Image_21032022173355078.png
|
2022-03-21 17:33:55.218338 |
537 |
47147226 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MANOJ SARKAR HOUSE TO KARTICK TOLA AT BHADISWAR |
101452 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MANOJ SARKAR HOUSE TO KARTICK TOLA AT BHADISWAR1 |
Completion of work |
-
latitude : 24.4413531,24.4413531,24.4413531
Longitude : 87.8647231,87.8647231,87.8647231
file name : Image_21032022173606395.png
|
2022-03-21 17:36:06.501551 |
538 |
57872247 |
CONS OF PCC ROAD FROM GOSHAI TOLA TO SASTI TOLA VIA SANNASI TO CHANDAN AND NIROS TO BIKASH LANE AT G |
89926 |
CONS OF PCC ROAD FROM GOSHAI TOLA TO SASTI TOLA VIA SANNASI TO CHANDAN AND NIROS TO BIKASH LANE AT G1 |
Roof laid |
-
latitude : 24.43484645,24.43481397,24.43480385
Longitude : 87.87577521,87.8757486,87.87575186
file name : Image_04052023123716606.png
|
2023-05-04 12:37:16.700477 |
539 |
57872247 |
CONS OF PCC ROAD FROM GOSHAI TOLA TO SASTI TOLA VIA SANNASI TO CHANDAN AND NIROS TO BIKASH LANE AT G |
89926 |
CONS OF PCC ROAD FROM GOSHAI TOLA TO SASTI TOLA VIA SANNASI TO CHANDAN AND NIROS TO BIKASH LANE AT G1 |
Plinth level |
-
latitude : 24.43483541,24.43482827
Longitude : 87.87575641,87.87575592
file name : Image_04052023123350831.png
|
2023-05-04 12:33:50.962566 |
540 |
57872247 |
CONS OF PCC ROAD FROM GOSHAI TOLA TO SASTI TOLA VIA SANNASI TO CHANDAN AND NIROS TO BIKASH LANE AT G |
89926 |
CONS OF PCC ROAD FROM GOSHAI TOLA TO SASTI TOLA VIA SANNASI TO CHANDAN AND NIROS TO BIKASH LANE AT G1 |
Completion of work |
-
latitude : 24.43488911,24.43487831
Longitude : 87.87577245,87.87579065
file name : Image_31032023150530734.png
|
2023-03-31 15:05:30.837288 |
541 |
47147236 |
CONST OF CONCRETE RCC COVER SLAB ON EXISTING PUCCA DRAIN FROM TUSHAR PANDIT HOUSE TO DURGA MANDIR VI |
100000 |
CONST OF CONCRETE RCC COVER SLAB ON EXISTING PUCCA DRAIN FROM TUSHAR PANDIT HOUSE TO DURGA MANDIR VI |
Completion of work |
-
latitude : 24.4402373,24.4402373
Longitude : 87.8564823,87.8564823
file name : Image_28062022150809873.png
|
2022-06-28 15:08:09.97177 |
542 |
47147236 |
CONST OF CONCRETE RCC COVER SLAB ON EXISTING PUCCA DRAIN FROM TUSHAR PANDIT HOUSE TO DURGA MANDIR VI |
100000 |
CONST OF CONCRETE RCC COVER SLAB ON EXISTING PUCCA DRAIN FROM TUSHAR PANDIT HOUSE TO DURGA MANDIR VI |
Completion of work |
-
latitude : 24.4402373,24.4402373
Longitude : 87.8564823,87.8564823
file name : Image_28062022143729499.png
|
2022-06-28 14:37:29.610788 |
543 |
47147236 |
CONST OF CONCRETE RCC COVER SLAB ON EXISTING PUCCA DRAIN FROM TUSHAR PANDIT HOUSE TO DURGA MANDIR VI |
100000 |
CONST OF CONCRETE RCC COVER SLAB ON EXISTING PUCCA DRAIN FROM TUSHAR PANDIT HOUSE TO DURGA MANDIR VI |
Completion of work |
-
latitude : 24.4402373,24.4402373
Longitude : 87.8564823,87.8564823
file name : Image_28062022150800970.png
|
2022-06-28 15:08:01.067464 |
544 |
47147078 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM AKTARI BEWA TO BARU SK HOUSE AT MURARAI |
80000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM AKTARI BEWA TO BARU SK HOUSE AT MURARAI |
Completion of work |
-
latitude : 24.44493333333333,24.444993333333333
Longitude : 87.85267166666667,87.85247333333334
file name : Image_17082022115418009.png
|
2022-08-17 11:54:18.162599 |
545 |
47147078 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM AKTARI BEWA TO BARU SK HOUSE AT MURARAI |
80000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM AKTARI BEWA TO BARU SK HOUSE AT MURARAI |
Completion of work |
-
latitude : 24.445006666666668,24.444984999999996
Longitude : 87.85237833333333,87.85245000000002
file name : Image_17082022115506349.png
|
2022-08-17 11:55:06.462585 |
546 |
47147078 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM AKTARI BEWA TO BARU SK HOUSE AT MURARAI |
80000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM AKTARI BEWA TO BARU SK HOUSE AT MURARAI |
Completion of work |
-
latitude : 24.4452266,24.4452266
Longitude : 87.8530427,87.8530427
file name : Image_17082022115603789.png
|
2022-08-17 11:56:03.901504 |
547 |
47147179 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM NAJIR SK TO MUNNA AND MONIRUDDIN TO SAKIM SK HOUS |
120000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM NAJIR SK TO MUNNA AND MONIRUDDIN TO SAKIM SK HOUS |
Completion of work |
-
latitude : 24.4403278,24.4403278
Longitude : 87.8561962,87.8561962
file name : Image_12082022113821812.png
|
2022-08-12 11:38:21.917741 |
548 |
47147179 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM NAJIR SK TO MUNNA AND MONIRUDDIN TO SAKIM SK HOUS |
120000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM NAJIR SK TO MUNNA AND MONIRUDDIN TO SAKIM SK HOUS |
Completion of work |
-
latitude : 24.4403278,24.4403278
Longitude : 87.8561962,87.8561962
file name : Image_12082022113830334.png
|
2022-08-12 11:38:30.431857 |
549 |
47147179 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM NAJIR SK TO MUNNA AND MONIRUDDIN TO SAKIM SK HOUS |
120000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM NAJIR SK TO MUNNA AND MONIRUDDIN TO SAKIM SK HOUS |
Completion of work |
-
latitude : 24.4403278,24.4403278
Longitude : 87.8561962,87.8561962
file name : Image_12082022113925346.png
|
2022-08-12 11:39:25.448855 |
550 |
47147179 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM NAJIR SK TO MUNNA AND MONIRUDDIN TO SAKIM SK HOUS |
120000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM NAJIR SK TO MUNNA AND MONIRUDDIN TO SAKIM SK HOUS |
Completion of work |
-
latitude : 24.4403278,24.4403278,24.4403278
Longitude : 87.8561962,87.8561962,87.8561962
file name : Image_12082022113809675.png
|
2022-08-12 11:38:09.779143 |
551 |
47147210 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MANNAN LAND TO OHAB HOUSE AND RCC COVER SLAB ON E |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MANNAN LAND TO OHAB HOUSE AND RCC COVER SLAB ON E |
Roof laid |
-
latitude : 24.44222446,24.44222221
Longitude : 87.85640277,87.85638787
file name : Image_29112022103606611.png
|
2022-11-29 10:36:06.735832 |
552 |
47147210 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MANNAN LAND TO OHAB HOUSE AND RCC COVER SLAB ON E |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MANNAN LAND TO OHAB HOUSE AND RCC COVER SLAB ON E |
Plinth level |
-
latitude : 24.4423531,24.44220738
Longitude : 87.8564694,87.85643345
file name : Image_24112022153114438.png
|
2022-11-24 15:31:14.539223 |
553 |
47147210 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MANNAN LAND TO OHAB HOUSE AND RCC COVER SLAB ON E |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MANNAN LAND TO OHAB HOUSE AND RCC COVER SLAB ON E |
Completion of work |
-
latitude : 24.4423531,24.4423076
Longitude : 87.8564694,87.8561547
file name : Image_24112022152637523.png
|
2022-11-24 15:26:37.61772 |
554 |
56643942 |
CONS PUCCA DRAIN INC PCC ROAD FROM MOSIBUR RAHAMAN TO MD KALAM AT BHADISWAR |
99919 |
CONS PUCCA DRAIN INC PCC ROAD FROM MOSIBUR RAHAMAN TO MD KALAM AT BHADISWAR1 |
Roof laid |
-
latitude : 24.4396802,24.4396884
Longitude : 87.8638074,87.8638238
file name : Image_04052023120019106.png
|
2023-05-04 12:00:19.211302 |
555 |
56643942 |
CONS PUCCA DRAIN INC PCC ROAD FROM MOSIBUR RAHAMAN TO MD KALAM AT BHADISWAR |
99919 |
CONS PUCCA DRAIN INC PCC ROAD FROM MOSIBUR RAHAMAN TO MD KALAM AT BHADISWAR1 |
Plinth level |
-
latitude : 24.439673,24.4396738
Longitude : 87.8638269,87.8638321
file name : Image_04052023115739730.png
|
2023-05-04 11:57:39.820652 |
556 |
56643942 |
CONS PUCCA DRAIN INC PCC ROAD FROM MOSIBUR RAHAMAN TO MD KALAM AT BHADISWAR |
99919 |
CONS PUCCA DRAIN INC PCC ROAD FROM MOSIBUR RAHAMAN TO MD KALAM AT BHADISWAR1 |
Completion of work |
-
latitude : 24.4396746,24.4396746
Longitude : 87.8638325,87.8638325
file name : Image_04052023115232573.png
|
2023-05-04 11:52:32.673471 |
557 |
47290090 |
CONST CULTURAL SHED NEAR GOPAL MANDIR AT BHADISWAR |
99000 |
CONST CULTURAL SHED NEAR GOPAL MANDIR AT BHADISWAR1 |
Completion of work |
-
latitude : 24.4411789
Longitude : 87.8647461
file name : Image_28062022113041517.png
|
2022-06-28 11:30:41.626799 |
558 |
47290090 |
CONST CULTURAL SHED NEAR GOPAL MANDIR AT BHADISWAR |
99000 |
CONST CULTURAL SHED NEAR GOPAL MANDIR AT BHADISWAR1 |
Completion of work |
-
latitude : 24.4411809
Longitude : 87.8647464
file name : Image_28062022113119387.png
|
2022-06-28 11:31:19.509654 |
559 |
47290090 |
CONST CULTURAL SHED NEAR GOPAL MANDIR AT BHADISWAR |
99000 |
CONST CULTURAL SHED NEAR GOPAL MANDIR AT BHADISWAR1 |
Completion of work |
-
latitude : 24.4411809
Longitude : 87.8647464
file name : Image_28062022113153565.png
|
2022-06-28 11:31:53.683466 |
560 |
47147647 |
RENOVATION OF GROUND FLOOR AND COLOURING OUT SIDE OF GP BUILDING |
250000 |
RENOVATION OF GROUND FLOOR AND COLOURING OUT SIDE OF GP BUILDING1 |
Completion of work |
-
latitude : 24.440198
Longitude : 87.8563613
file name : Image_08072022144949133.png
|
2022-07-08 14:49:49.263691 |
561 |
47147647 |
RENOVATION OF GROUND FLOOR AND COLOURING OUT SIDE OF GP BUILDING |
250000 |
RENOVATION OF GROUND FLOOR AND COLOURING OUT SIDE OF GP BUILDING1 |
Completion of work |
-
latitude : 24.4402581
Longitude : 87.8563552
file name : Image_12072022152239566.png
|
2022-07-12 15:22:39.661424 |
562 |
47147647 |
RENOVATION OF GROUND FLOOR AND COLOURING OUT SIDE OF GP BUILDING |
250000 |
RENOVATION OF GROUND FLOOR AND COLOURING OUT SIDE OF GP BUILDING1 |
Completion of work |
-
latitude : 24.4401768
Longitude : 87.8563646
file name : Image_12072022152242649.png
|
2022-07-12 15:22:42.742311 |
563 |
47147647 |
RENOVATION OF GROUND FLOOR AND COLOURING OUT SIDE OF GP BUILDING |
250000 |
RENOVATION OF GROUND FLOOR AND COLOURING OUT SIDE OF GP BUILDING1 |
Completion of work |
-
latitude : 24.4401768
Longitude : 87.8563646
file name : Image_12072022152245737.png
|
2022-07-12 15:22:45.827993 |
564 |
47147610 |
CONST OF CONCRETE CHATAL IN FORNT OF PUMP HOUSE AT GHUSKIRA |
70000 |
CONST OF CONCRETE CHATAL IN FORNT OF PUMP HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.417743333333338,24.41774666666667
Longitude : 87.85462833333334,87.85461833333332
file name : Image_19072022171159155.png
|
2022-07-19 17:11:59.251643 |
565 |
47147610 |
CONST OF CONCRETE CHATAL IN FORNT OF PUMP HOUSE AT GHUSKIRA |
70000 |
CONST OF CONCRETE CHATAL IN FORNT OF PUMP HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.417753333333334,24.417786666666665
Longitude : 87.85462333333335,87.85461
file name : Image_19072022171116523.png
|
2022-07-19 17:11:16.635776 |
566 |
47147610 |
CONST OF CONCRETE CHATAL IN FORNT OF PUMP HOUSE AT GHUSKIRA |
70000 |
CONST OF CONCRETE CHATAL IN FORNT OF PUMP HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.417761666666667,24.41775
Longitude : 87.85467166666668,87.85466666666667
file name : Image_19072022171020914.png
|
2022-07-19 17:10:21.009173 |
567 |
47147025 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SAFIKUL SK TO MONIRUL ISLAM HOUSE AT DHITORA |
150000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SAFIKUL SK TO MONIRUL ISLAM HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.4401623,24.4401623
Longitude : 87.8562735,87.8562735
file name : Image_02092022140748164.png
|
2022-09-02 14:07:48.272354 |
568 |
47147025 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SAFIKUL SK TO MONIRUL ISLAM HOUSE AT DHITORA |
150000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SAFIKUL SK TO MONIRUL ISLAM HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.4401623,24.4401623
Longitude : 87.8562735,87.8562735
file name : Image_02092022140908958.png
|
2022-09-02 14:09:09.053223 |
569 |
47147025 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SAFIKUL SK TO MONIRUL ISLAM HOUSE AT DHITORA |
150000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM SAFIKUL SK TO MONIRUL ISLAM HOUSE AT DHITORA1 |
Completion of work |
-
latitude : 24.4401623,24.4401623
Longitude : 87.8562735,87.8562735
file name : Image_02092022141004665.png
|
2022-09-02 14:10:04.801433 |
570 |
47117201 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM RESINKING TUBEWELL AT DARPONARAYANPUR GD PAR |
99000 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM RESINKING TUBEWELL AT DARPONARAYANPUR GD PAR |
Completion of work |
-
latitude : 24.4418005
Longitude : 87.8579085
file name : Image_05082022153504767.png
|
2022-08-05 15:35:04.926391 |
571 |
47117201 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM RESINKING TUBEWELL AT DARPONARAYANPUR GD PAR |
99000 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM RESINKING TUBEWELL AT DARPONARAYANPUR GD PAR |
Completion of work |
-
latitude : 24.4418078
Longitude : 87.8579252
file name : Image_05082022153540506.png
|
2022-08-05 15:35:40.651042 |
572 |
47117201 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM RESINKING TUBEWELL AT DARPONARAYANPUR GD PAR |
99000 |
MAINTAINANCE AND REPAIRING OF TUBEWELL SUB MARSIBLE PUM RESINKING TUBEWELL AT DARPONARAYANPUR GD PAR |
Completion of work |
-
latitude : 24.4415489
Longitude : 87.8579945
file name : Image_05082022153711794.png
|
2022-08-05 15:37:11.932896 |
573 |
56634126 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO RAZZAK TOWARDS RUHUL VIA SHORIF AT MURARAI |
149969 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO RAZZAK TOWARDS RUHUL VIA SHORIF AT MURARAI1 |
Roof laid |
-
latitude : 24.44313456,24.44314659,24.442409
Longitude : 87.85220439,87.85219185,87.8519477
file name : Image_11052023113708164.png
|
2023-05-11 11:37:08.260073 |
574 |
56634126 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO RAZZAK TOWARDS RUHUL VIA SHORIF AT MURARAI |
149969 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO RAZZAK TOWARDS RUHUL VIA SHORIF AT MURARAI1 |
Plinth level |
-
latitude : 24.4443924,24.4443896,24.4423407
Longitude : 87.8528681,87.8528702,87.8518141
file name : Image_11052023113205441.png
|
2023-05-11 11:32:05.56127 |
575 |
56634126 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO RAZZAK TOWARDS RUHUL VIA SHORIF AT MURARAI |
149969 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO RAZZAK TOWARDS RUHUL VIA SHORIF AT MURARAI1 |
Completion of work |
-
latitude : 24.4444641,24.44332266
Longitude : 87.8529305,87.85225585
file name : Image_06042023141346549.png
|
2023-04-06 14:13:46.63647 |
576 |
56643395 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO JOY PRAKASH TOWARDS DURGA MANDIR AT BHASIWAR |
149937 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO JOY PRAKASH TOWARDS DURGA MANDIR AT BHASIWAR1 |
Roof laid |
-
latitude : 24.44234498,24.44234427,24.44234641
Longitude : 87.86094573,87.86093388,87.86091007
file name : Image_12052023121538420.png
|
2023-05-12 12:15:38.510368 |
577 |
56643395 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO JOY PRAKASH TOWARDS DURGA MANDIR AT BHASIWAR |
149937 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO JOY PRAKASH TOWARDS DURGA MANDIR AT BHASIWAR1 |
Plinth level |
-
latitude : 24.44236723,24.44236164
Longitude : 87.86081004,87.86083244
file name : Image_12052023121027179.png
|
2023-05-12 12:10:27.289239 |
578 |
56643395 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO JOY PRAKASH TOWARDS DURGA MANDIR AT BHASIWAR |
149937 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO JOY PRAKASH TOWARDS DURGA MANDIR AT BHASIWAR1 |
Completion of work |
-
latitude : 24.44235975,24.44235377,24.44235324
Longitude : 87.86083384,87.86085031,87.86083972
file name : Image_13042023131640974.png
|
2023-04-13 13:16:41.081706 |
579 |
56643162 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO PROSHANTO MONDAL TOWARDS PWD ROAD AT BHASIWAR |
99929 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO PROSHANTO MONDAL TOWARDS PWD ROAD AT BHASIWAR1 |
Roof laid |
-
latitude : 24.4397459,24.4397307
Longitude : 87.8641221,87.8641085
file name : Image_08052023141959016.png
|
2023-05-08 14:19:59.100202 |
580 |
56643162 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO PROSHANTO MONDAL TOWARDS PWD ROAD AT BHASIWAR |
99929 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO PROSHANTO MONDAL TOWARDS PWD ROAD AT BHASIWAR1 |
Plinth level |
-
latitude : 24.4397277,24.4397601,24.4397581
Longitude : 87.8641363,87.8640891,87.8640814
file name : Image_08052023141705699.png
|
2023-05-08 14:17:05.797791 |
581 |
56643162 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO PROSHANTO MONDAL TOWARDS PWD ROAD AT BHASIWAR |
99929 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO PROSHANTO MONDAL TOWARDS PWD ROAD AT BHASIWAR1 |
Completion of work |
-
latitude : 24.44066837,24.4397799,24.4397799,24.4397727,24.4397853
Longitude : 87.86405482,87.8640746,87.8640746,87.8640463,87.8640979
file name : Image_18042023131402215.png
|
2023-04-18 13:14:02.270638 |
582 |
56903716 |
CONS OF PCC ROAD FROM HO TOUHID MOLLA TOWARDS PWD ROAD AT GHUSKIRA |
149962 |
CONS OF PCC ROAD FROM HO TOUHID MOLLA TOWARDS PWD ROAD AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41682166666667,24.41679333333333,24.416803333333338
Longitude : 87.85868333333335,87.85864666666666,87.85863499999999
file name : Image_31052023125907968.png
|
2023-05-31 12:59:08.062947 |
583 |
56903716 |
CONS OF PCC ROAD FROM HO TOUHID MOLLA TOWARDS PWD ROAD AT GHUSKIRA |
149962 |
CONS OF PCC ROAD FROM HO TOUHID MOLLA TOWARDS PWD ROAD AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.416808333333332,24.416825000000003,24.41685166666667
Longitude : 87.85859333333335,87.858625,87.85862
file name : Image_31052023125904081.png
|
2023-05-31 12:59:04.189915 |
584 |
56903716 |
CONS OF PCC ROAD FROM HO TOUHID MOLLA TOWARDS PWD ROAD AT GHUSKIRA |
149962 |
CONS OF PCC ROAD FROM HO TOUHID MOLLA TOWARDS PWD ROAD AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.41683183,24.41683262,24.41683224
Longitude : 87.85861272,87.85861218,87.85861297
file name : Image_22052023123411895.png
|
2023-05-22 12:34:11.98146 |
585 |
56903716 |
CONS OF PCC ROAD FROM HO TOUHID MOLLA TOWARDS PWD ROAD AT GHUSKIRA |
149962 |
CONS OF PCC ROAD FROM HO TOUHID MOLLA TOWARDS PWD ROAD AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41690474,24.41687822
Longitude : 87.85863693,87.85860847
file name : Image_15052023132032060.png
|
2023-05-15 13:20:32.17942 |
586 |
56634005 |
CONS OF PCC ROAD INCL SIDE DRAIN FROM HO MANOJ MONDAL TO A BISWAS VIA T KARMOKAR AT MURARAI |
99600 |
CONS OF PCC ROAD INCL SIDE DRAIN FROM HO MANOJ MONDAL TO A BISWAS VIA T KARMOKAR AT MURARAI1 |
Roof laid |
-
latitude : 24.4402189,24.4402189,24.4402189
Longitude : 87.8563055,87.8563055,87.8563055
file name : Image_08062023155636101.png
|
2023-06-08 15:56:36.196441 |
587 |
56634005 |
CONS OF PCC ROAD INCL SIDE DRAIN FROM HO MANOJ MONDAL TO A BISWAS VIA T KARMOKAR AT MURARAI |
99600 |
CONS OF PCC ROAD INCL SIDE DRAIN FROM HO MANOJ MONDAL TO A BISWAS VIA T KARMOKAR AT MURARAI1 |
Plinth level |
-
latitude : 24.4399,24.4398997,24.4398997
Longitude : 87.8532885,87.8532938,87.8532938
file name : Image_31052023121909865.png
|
2023-05-31 12:19:09.972357 |
588 |
56634005 |
CONS OF PCC ROAD INCL SIDE DRAIN FROM HO MANOJ MONDAL TO A BISWAS VIA T KARMOKAR AT MURARAI |
99600 |
CONS OF PCC ROAD INCL SIDE DRAIN FROM HO MANOJ MONDAL TO A BISWAS VIA T KARMOKAR AT MURARAI1 |
Completion of work |
-
latitude : 24.4398995,24.43972148,24.43973045
Longitude : 87.8532926,87.85311009,87.85309894
file name : Image_26052023160428586.png
|
2023-05-26 16:04:28.693234 |
589 |
56633825 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO CHHOTU TOWARDS FOKIR SKHOUSE AT NAJRULPOLLY |
99000 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO CHHOTU TOWARDS FOKIR SKHOUSE AT NAJRULPOLLY1 |
Plinth level |
-
latitude : 24.4492119,24.4492116,24.44922148
Longitude : 87.85437428,87.85436065,87.85436501
file name : Image_03102023123312895.png
|
2023-10-03 12:33:12.999515 |
590 |
56633825 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO CHHOTU TOWARDS FOKIR SKHOUSE AT NAJRULPOLLY |
99000 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO CHHOTU TOWARDS FOKIR SKHOUSE AT NAJRULPOLLY1 |
Completion of work |
-
latitude : 24.44931266,24.44930157,24.44934002
Longitude : 87.85506723,87.85507019,87.8550895
file name : Image_24072023161710423.png
|
2023-07-24 16:17:10.495728 |
591 |
56633393 |
CONS PUCCA DRAIN WITH COVER SLAB FROM CHHOTO MASJID TOWARDS SAHEB HOUSE AT PANIARA |
149973 |
CONS PUCCA DRAIN WITH COVER SLAB FROM CHHOTO MASJID TOWARDS SAHEB HOUSE AT PANIARA1 |
Roof laid |
-
latitude : 24.43556085,24.43559973,24.43560265
Longitude : 87.84550089,87.84546657,87.84546582
file name : Image_29052023130409123.png
|
2023-05-29 13:04:09.269396 |
592 |
56633393 |
CONS PUCCA DRAIN WITH COVER SLAB FROM CHHOTO MASJID TOWARDS SAHEB HOUSE AT PANIARA |
149973 |
CONS PUCCA DRAIN WITH COVER SLAB FROM CHHOTO MASJID TOWARDS SAHEB HOUSE AT PANIARA1 |
Plinth level |
-
latitude : 24.43563035,24.43562089
Longitude : 87.84546782,87.84546442
file name : Image_24052023114450368.png
|
2023-05-24 11:44:50.469479 |
593 |
56633393 |
CONS PUCCA DRAIN WITH COVER SLAB FROM CHHOTO MASJID TOWARDS SAHEB HOUSE AT PANIARA |
149973 |
CONS PUCCA DRAIN WITH COVER SLAB FROM CHHOTO MASJID TOWARDS SAHEB HOUSE AT PANIARA1 |
Completion of work |
-
latitude : 24.43561198,24.43559689
Longitude : 87.84540193,87.84541791
file name : Image_15052023124501418.png
|
2023-05-15 12:45:01.546301 |
594 |
47149801 |
CONST OF CONCRETE ROAD FROM MIHIR MONDAL HOUSE TO DURGA MANDIR VIA BIKASH DAS HOUSE AT BHADISWAR |
150000 |
CONST OF CONCRETE ROAD FROM MIHIR MONDAL HOUSE TO DURGA MANDIR VIA BIKASH DAS HOUSE AT BHADISWAR |
Completion of work |
-
latitude : 24.442293333333335,24.442293333333335
Longitude : 87.86063,87.86050333333333
file name : Image_26082022170932050.png
|
2022-08-26 17:09:32.163648 |
595 |
47149801 |
CONST OF CONCRETE ROAD FROM MIHIR MONDAL HOUSE TO DURGA MANDIR VIA BIKASH DAS HOUSE AT BHADISWAR |
150000 |
CONST OF CONCRETE ROAD FROM MIHIR MONDAL HOUSE TO DURGA MANDIR VIA BIKASH DAS HOUSE AT BHADISWAR |
Completion of work |
-
latitude : 24.442378333333334,24.442288333333334
Longitude : 87.86041333333333,87.86055999999999
file name : Image_26082022170716535.png
|
2022-08-26 17:07:16.657883 |
596 |
47149801 |
CONST OF CONCRETE ROAD FROM MIHIR MONDAL HOUSE TO DURGA MANDIR VIA BIKASH DAS HOUSE AT BHADISWAR |
150000 |
CONST OF CONCRETE ROAD FROM MIHIR MONDAL HOUSE TO DURGA MANDIR VIA BIKASH DAS HOUSE AT BHADISWAR |
Completion of work |
-
latitude : 24.442320000000002,24.44230166666667
Longitude : 87.86078333333334,87.86070666666667
file name : Image_26082022170831291.png
|
2022-08-26 17:08:31.370526 |
597 |
47147244 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MIMJAR SK HOUSE TO TALBUNA PUKUR AT BHADISWAR |
150000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MIMJAR SK HOUSE TO TALBUNA PUKUR AT BHADISWAR1 |
Completion of work |
-
latitude : 24.4401624,24.4401624
Longitude : 87.8562745,87.8562745
file name : Image_30082022131827131.png
|
2022-08-30 13:18:27.227907 |
598 |
47147244 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MIMJAR SK HOUSE TO TALBUNA PUKUR AT BHADISWAR |
150000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MIMJAR SK HOUSE TO TALBUNA PUKUR AT BHADISWAR1 |
Completion of work |
-
latitude : 24.4401624,24.4401624
Longitude : 87.8562745,87.8562745
file name : Image_31082022163736499.png
|
2022-08-31 16:37:36.592778 |
599 |
47147244 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MIMJAR SK HOUSE TO TALBUNA PUKUR AT BHADISWAR |
150000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MIMJAR SK HOUSE TO TALBUNA PUKUR AT BHADISWAR1 |
Completion of work |
-
latitude : 24.4401624,24.4401624
Longitude : 87.8562745,87.8562745
file name : Image_31082022163742213.png
|
2022-08-31 16:37:42.305331 |
600 |
47147244 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MIMJAR SK HOUSE TO TALBUNA PUKUR AT BHADISWAR |
150000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MIMJAR SK HOUSE TO TALBUNA PUKUR AT BHADISWAR1 |
Completion of work |
-
latitude : 24.4401624,24.4401624
Longitude : 87.8562745,87.8562745
file name : Image_31082022163803546.png
|
2022-08-31 16:38:03.655196 |
601 |
47147244 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MIMJAR SK HOUSE TO TALBUNA PUKUR AT BHADISWAR |
150000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MIMJAR SK HOUSE TO TALBUNA PUKUR AT BHADISWAR1 |
Completion of work |
-
latitude : 24.4401624,24.4401624
Longitude : 87.8562745,87.8562745
file name : Image_31082022163806481.png
|
2022-08-31 16:38:06.57585 |
602 |
47147244 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MIMJAR SK HOUSE TO TALBUNA PUKUR AT BHADISWAR |
150000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM MIMJAR SK HOUSE TO TALBUNA PUKUR AT BHADISWAR1 |
Completion of work |
-
latitude : 24.4401624,24.4401624
Longitude : 87.8562745,87.8562745
file name : Image_31082022163739352.png
|
2022-08-31 16:37:39.454911 |
603 |
56635344 |
CONS PUCCA DRAIN INCL PCC ROAD FROM HO B SAHU TOWARDS REZAUL KARIM AT MURARAI |
99600 |
CONS PUCCA DRAIN INCL PCC ROAD FROM HO B SAHU TOWARDS REZAUL KARIM AT MURARAI1 |
Plinth level |
-
latitude : 24.4396078,24.43759324,24.4381507
Longitude : 87.861267,87.85740161,87.8586382
file name : Image_26052023114223149.png
|
2023-05-26 11:42:23.24949 |
604 |
56635344 |
CONS PUCCA DRAIN INCL PCC ROAD FROM HO B SAHU TOWARDS REZAUL KARIM AT MURARAI |
99600 |
CONS PUCCA DRAIN INCL PCC ROAD FROM HO B SAHU TOWARDS REZAUL KARIM AT MURARAI1 |
Completion of work |
-
latitude : 24.4401352,24.4401352,24.4401352
Longitude : 87.8563776,87.8563776,87.8563776
file name : Image_17052023151424419.png
|
2023-05-17 15:14:24.568449 |
605 |
47147407 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM FUL BAJIUDDIN HOUSE TO SELIM SK HOUSE AT GHUSKIRA |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM FUL BAJIUDDIN HOUSE TO SELIM SK HOUSE AT GHUSKIRA |
Completion of work |
-
latitude : 24.418121666666668,24.418006666666663
Longitude : 87.85719833333333,87.857185
file name : Image_10082022121810435.png
|
2022-08-10 12:18:10.537961 |
606 |
47147407 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM FUL BAJIUDDIN HOUSE TO SELIM SK HOUSE AT GHUSKIRA |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM FUL BAJIUDDIN HOUSE TO SELIM SK HOUSE AT GHUSKIRA |
Completion of work |
-
latitude : 24.417981666666666,24.417993333333335
Longitude : 87.85733166666665,87.85725833333332
file name : Image_10082022121900425.png
|
2022-08-10 12:19:00.535472 |
607 |
47147407 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM FUL BAJIUDDIN HOUSE TO SELIM SK HOUSE AT GHUSKIRA |
100000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM FUL BAJIUDDIN HOUSE TO SELIM SK HOUSE AT GHUSKIRA |
Completion of work |
-
latitude : 24.418041666666667,24.418103333333338
Longitude : 87.85712666666669,87.85717666666666
file name : Image_10082022122016758.png
|
2022-08-10 12:20:16.851082 |
608 |
47147100 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM BITHIKA GUI TO RAKIBUL ISLAM HOUSE AT HAZRADIGHI |
99000 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM BITHIKA GUI TO RAKIBUL ISLAM HOUSE AT HAZRADIGHI |
Completion of work |
-
latitude : 24.437704,24.437734999999996
Longitude : 87.8562029,87.85630166666667
file name : Image_13092022144840571.png
|
2022-09-13 14:48:40.672578 |
609 |
47147100 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM BITHIKA GUI TO RAKIBUL ISLAM HOUSE AT HAZRADIGHI |
99000 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM BITHIKA GUI TO RAKIBUL ISLAM HOUSE AT HAZRADIGHI |
Completion of work |
-
latitude : 24.4377091,24.4377088
Longitude : 87.8562068,87.8562061
file name : Image_13092022144933839.png
|
2022-09-13 14:49:33.94385 |
610 |
47147100 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM BITHIKA GUI TO RAKIBUL ISLAM HOUSE AT HAZRADIGHI |
99000 |
CONST OF CONCRETE ROAD INCLUDING SIDE DRAIN FROM BITHIKA GUI TO RAKIBUL ISLAM HOUSE AT HAZRADIGHI |
Completion of work |
-
latitude : 24.4377103,24.4377094
Longitude : 87.8562079,87.8562081
file name : Image_13092022145045613.png
|
2022-09-13 14:50:45.719986 |
611 |
47147359 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BABLU SAHANA HOUSE TO PWD ROAD AT GHUSKIRA TALUHA |
150000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BABLU SAHANA HOUSE TO PWD ROAD AT GHUSKIRA TALUHA |
Completion of work |
-
latitude : 24.4397059,24.4397059
Longitude : 87.8578981,87.8578981
file name : Image_12082022174655822.png
|
2022-08-12 17:46:55.928786 |
612 |
47147359 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BABLU SAHANA HOUSE TO PWD ROAD AT GHUSKIRA TALUHA |
150000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BABLU SAHANA HOUSE TO PWD ROAD AT GHUSKIRA TALUHA |
Completion of work |
-
latitude : 24.4397059,24.4397059
Longitude : 87.8578981,87.8578981
file name : Image_12082022174447501.png
|
2022-08-12 17:44:47.607365 |
613 |
47147359 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BABLU SAHANA HOUSE TO PWD ROAD AT GHUSKIRA TALUHA |
150000 |
CONST OF CONCRETE PUCCA DRAIN WITH COVER SLAB FROM BABLU SAHANA HOUSE TO PWD ROAD AT GHUSKIRA TALUHA |
Completion of work |
-
latitude : 24.4397059,24.4397059
Longitude : 87.8578981,87.8578981
file name : Image_12082022173938766.png
|
2022-08-12 17:39:38.875443 |
614 |
47114703 |
PURCHASE TUBEWELL MATERIAL FOR MAINTAINANCE OF TUBEWELL THROUGH THE SANSAD NO XIII TO XXVI UNDER MUR |
480000 |
PURCHASE TUBEWELL MATERIAL FOR MAINTAINANCE OF TUBEWELL THROUGH THE SANSAD NO XIII TO XXVI UNDER MUR |
Completion of work |
-
latitude : 24.4402172
Longitude : 87.8563135
file name : Image_17082022143001254.png
|
2022-08-17 14:30:01.344295 |
615 |
47114703 |
PURCHASE TUBEWELL MATERIAL FOR MAINTAINANCE OF TUBEWELL THROUGH THE SANSAD NO XIII TO XXVI UNDER MUR |
480000 |
PURCHASE TUBEWELL MATERIAL FOR MAINTAINANCE OF TUBEWELL THROUGH THE SANSAD NO XIII TO XXVI UNDER MUR |
Completion of work |
-
latitude : 24.4402105
Longitude : 87.8563069
file name : Image_17082022143004156.png
|
2022-08-17 14:30:04.245897 |
616 |
47114703 |
PURCHASE TUBEWELL MATERIAL FOR MAINTAINANCE OF TUBEWELL THROUGH THE SANSAD NO XIII TO XXVI UNDER MUR |
480000 |
PURCHASE TUBEWELL MATERIAL FOR MAINTAINANCE OF TUBEWELL THROUGH THE SANSAD NO XIII TO XXVI UNDER MUR |
Completion of work |
-
latitude : 24.4401927
Longitude : 87.8563131
file name : Image_17082022143007069.png
|
2022-08-17 14:30:07.162755 |
617 |
47114703 |
PURCHASE TUBEWELL MATERIAL FOR MAINTAINANCE OF TUBEWELL THROUGH THE SANSAD NO XIII TO XXVI UNDER MUR |
480000 |
PURCHASE TUBEWELL MATERIAL FOR MAINTAINANCE OF TUBEWELL THROUGH THE SANSAD NO XIII TO XXVI UNDER MUR |
Completion of work |
-
latitude : 24.4402105
Longitude : 87.8563069
file name : Image_17082022143009899.png
|
2022-08-17 14:30:09.988394 |
618 |
47114703 |
PURCHASE TUBEWELL MATERIAL FOR MAINTAINANCE OF TUBEWELL THROUGH THE SANSAD NO XIII TO XXVI UNDER MUR |
480000 |
PURCHASE TUBEWELL MATERIAL FOR MAINTAINANCE OF TUBEWELL THROUGH THE SANSAD NO XIII TO XXVI UNDER MUR |
Completion of work |
-
latitude : 24.4401927
Longitude : 87.8563131
file name : Image_17082022143012796.png
|
2022-08-17 14:30:12.889901 |
619 |
47147779 |
MAINTANENCE OF RAOD REPAIRING BY STONE DUST IN RAINY SEASON AND ELECTION URGENT IN BOOTH PREMISES VA |
300000 |
MAINTANENCE OF RAOD REPAIRING BY STONE DUST IN RAINY SEASON AND ELECTION URGENT IN BOOTH PREMISES VA |
Completion of work |
-
latitude : 24.41815,24.418166666666668
Longitude : 87.85952833333334,87.85952833333334
file name : Image_25082022112216612.png
|
2022-08-25 11:22:16.701855 |
620 |
47147779 |
MAINTANENCE OF RAOD REPAIRING BY STONE DUST IN RAINY SEASON AND ELECTION URGENT IN BOOTH PREMISES VA |
300000 |
MAINTANENCE OF RAOD REPAIRING BY STONE DUST IN RAINY SEASON AND ELECTION URGENT IN BOOTH PREMISES VA |
Completion of work |
-
latitude : 24.418159999999997,24.418165
Longitude : 87.85949000000001,87.85948666666667
file name : Image_25082022114129890.png
|
2022-08-25 11:41:30.01583 |
621 |
47147779 |
MAINTANENCE OF RAOD REPAIRING BY STONE DUST IN RAINY SEASON AND ELECTION URGENT IN BOOTH PREMISES VA |
300000 |
MAINTANENCE OF RAOD REPAIRING BY STONE DUST IN RAINY SEASON AND ELECTION URGENT IN BOOTH PREMISES VA |
Completion of work |
-
latitude : 24.418155000000002,24.418141666666664
Longitude : 87.85946833333334,87.859495
file name : Image_25082022112106752.png
|
2022-08-25 11:21:06.852241 |
622 |
47149609 |
CONST OF CONCRETE ROAD FROM BINDU BHUIMALI TO CHANCHALI BHUIMALI HOUSE AT BHADISWAR |
100000 |
CONST OF CONCRETE ROAD FROM BINDU BHUIMALI TO CHANCHALI BHUIMALI HOUSE AT BHADISWAR |
Completion of work |
-
latitude : 24.43971333333333,24.439703333333334,24.439709999999998
Longitude : 87.86652833333333,87.86653833333334,87.86661000000001
file name : Image_29112022154309238.png
|
2022-11-29 15:43:09.3351 |
623 |
47149609 |
CONST OF CONCRETE ROAD FROM BINDU BHUIMALI TO CHANCHALI BHUIMALI HOUSE AT BHADISWAR |
100000 |
CONST OF CONCRETE ROAD FROM BINDU BHUIMALI TO CHANCHALI BHUIMALI HOUSE AT BHADISWAR |
Completion of work |
-
latitude : 24.439706666666666,24.439743333333332,24.439718333333335,24.43971333333333
Longitude : 87.86652000000001,87.86652833333333,87.86653333333334,87.86660833333332
file name : Image_29112022154036806.png
|
2022-11-29 15:40:36.915873 |
624 |
47149609 |
CONST OF CONCRETE ROAD FROM BINDU BHUIMALI TO CHANCHALI BHUIMALI HOUSE AT BHADISWAR |
100000 |
CONST OF CONCRETE ROAD FROM BINDU BHUIMALI TO CHANCHALI BHUIMALI HOUSE AT BHADISWAR |
Completion of work |
-
latitude : 24.43972666666667,24.43974166666667,24.439705000000004
Longitude : 87.86662833333334,87.86667833333334,87.866615
file name : Image_29112022153539893.png
|
2022-11-29 15:35:39.98667 |
625 |
47147811 |
MAINTANENCE OF STREET LIGNT VARIOUS LOCATION UNDER MURARAI GP |
97000 |
MAINTANENCE OF STREET LIGNT VARIOUS LOCATION UNDER MURARAI GP |
Roof laid |
-
latitude : 24.4402893
Longitude : 87.8563171
file name : Image_05012023143440483.png
|
2023-01-05 14:34:40.59094 |
626 |
47147811 |
MAINTANENCE OF STREET LIGNT VARIOUS LOCATION UNDER MURARAI GP |
97000 |
MAINTANENCE OF STREET LIGNT VARIOUS LOCATION UNDER MURARAI GP |
Plinth level |
-
latitude : 24.4402759
Longitude : 87.8563502
file name : Image_05012023143116178.png
|
2023-01-05 14:31:16.348286 |
627 |
47147811 |
MAINTANENCE OF STREET LIGNT VARIOUS LOCATION UNDER MURARAI GP |
97000 |
MAINTANENCE OF STREET LIGNT VARIOUS LOCATION UNDER MURARAI GP |
Plinth level |
-
latitude : 24.4402574
Longitude : 87.8563589
file name : Image_05012023143120182.png
|
2023-01-05 14:31:20.291053 |
628 |
47147811 |
MAINTANENCE OF STREET LIGNT VARIOUS LOCATION UNDER MURARAI GP |
97000 |
MAINTANENCE OF STREET LIGNT VARIOUS LOCATION UNDER MURARAI GP |
Completion of work |
-
latitude : 24.440258
Longitude : 87.8563415
file name : Image_04012023120649972.png
|
2023-01-04 12:06:50.066504 |
629 |
47147106 |
CONST OF CONCRETE PUCCA DRAIN WITH RCC COVER SLAB FROM SUBODH DEBNATH TO NRITYA DUTTA HOUSE AT MURAR |
99000 |
CONST OF CONCRETE PUCCA DRAIN WITH RCC COVER SLAB FROM SUBODH DEBNATH TO NRITYA DUTTA HOUSE AT MURAR |
Roof laid |
-
latitude : 24.4401156,24.4401156
Longitude : 87.8558741,87.8558741
file name : Image_04012023120206872.png
|
2023-01-04 12:02:06.961457 |
630 |
47147106 |
CONST OF CONCRETE PUCCA DRAIN WITH RCC COVER SLAB FROM SUBODH DEBNATH TO NRITYA DUTTA HOUSE AT MURAR |
99000 |
CONST OF CONCRETE PUCCA DRAIN WITH RCC COVER SLAB FROM SUBODH DEBNATH TO NRITYA DUTTA HOUSE AT MURAR |
Plinth level |
-
latitude : 24.4401089,24.4401156
Longitude : 87.8558636,87.8558741
file name : Image_04012023120104033.png
|
2023-01-04 12:01:04.139357 |
631 |
47147106 |
CONST OF CONCRETE PUCCA DRAIN WITH RCC COVER SLAB FROM SUBODH DEBNATH TO NRITYA DUTTA HOUSE AT MURAR |
99000 |
CONST OF CONCRETE PUCCA DRAIN WITH RCC COVER SLAB FROM SUBODH DEBNATH TO NRITYA DUTTA HOUSE AT MURAR |
Completion of work |
-
latitude : 24.4401171,24.4401181
Longitude : 87.8558812,87.8558781
file name : Image_04012023115715764.png
|
2023-01-04 11:57:15.884248 |
632 |
68098984 |
Services of Collection & transportation of waste from household to treatment site |
100000 |
Services of Collection & transportation of waste from household to treatment site1 |
Roof laid |
-
latitude : 24.4402795
Longitude : 87.8563937
file name : Image_29122023123838059.png
|
2023-12-29 12:38:38.177038 |
633 |
68098984 |
Services of Collection & transportation of waste from household to treatment site |
100000 |
Services of Collection & transportation of waste from household to treatment site1 |
Plinth level |
-
latitude : 24.4402803
Longitude : 87.8563434
file name : Image_29122023123127199.png
|
2023-12-29 12:31:27.283586 |
634 |
68098984 |
Services of Collection & transportation of waste from household to treatment site |
100000 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 24.4402817
Longitude : 87.8563572
file name : Image_29122023122517446.png
|
2023-12-29 12:25:17.541407 |
635 |
56786840 |
CONS OF PCC ROAD FROM HO LOVELY TOWARDS FULBAS AT MIAPUR |
139949 |
CONS OF PCC ROAD FROM HO LOVELY TOWARDS FULBAS AT MIAPUR1 |
Roof laid |
-
latitude : 24.4402747,24.4402747,24.4402747
Longitude : 87.8563037,87.8563037,87.8563037
file name : Image_07062023134921515.png
|
2023-06-07 13:49:21.61542 |
636 |
56786840 |
CONS OF PCC ROAD FROM HO LOVELY TOWARDS FULBAS AT MIAPUR |
139949 |
CONS OF PCC ROAD FROM HO LOVELY TOWARDS FULBAS AT MIAPUR1 |
Completion of work |
-
latitude : 24.45607,24.456079999999996,24.45605666666667
Longitude : 87.84698166666666,87.84694499999999,87.84699166666665
file name : Image_02062023135205429.png
|
2023-06-02 13:52:05.534996 |
637 |
56786840 |
CONS OF PCC ROAD FROM HO LOVELY TOWARDS FULBAS AT MIAPUR |
139949 |
CONS OF PCC ROAD FROM HO LOVELY TOWARDS FULBAS AT MIAPUR1 |
Completion of work |
-
latitude : 24.45597593,24.45597767,24.45597763
Longitude : 87.84714169,87.84714002,87.8471367
file name : Image_16052023110932130.png
|
2023-05-16 11:09:32.234285 |
638 |
56673432 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO NITAI MAL TO S SARKAR VAI RAGHUNATH MAL TO KANAK LATA A |
179853 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO NITAI MAL TO S SARKAR VAI RAGHUNATH MAL TO KANAK LATA A1 |
Roof laid |
-
latitude : 24.42282164,24.42283691,24.42283136
Longitude : 87.86454972,87.86456964,87.86455124
file name : Image_07062023123242085.png
|
2023-06-07 12:32:42.195797 |
639 |
56673432 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO NITAI MAL TO S SARKAR VAI RAGHUNATH MAL TO KANAK LATA A |
179853 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO NITAI MAL TO S SARKAR VAI RAGHUNATH MAL TO KANAK LATA A1 |
Completion of work |
-
latitude : 24.422829999999998,24.422761666666663,24.42284833333333
Longitude : 87.86458166666668,87.86461166666668,87.86461833333333
file name : Image_01062023174952545.png
|
2023-06-01 17:49:52.677197 |
640 |
56673432 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO NITAI MAL TO S SARKAR VAI RAGHUNATH MAL TO KANAK LATA A |
179853 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO NITAI MAL TO S SARKAR VAI RAGHUNATH MAL TO KANAK LATA A1 |
Completion of work |
-
latitude : 24.422685,24.422700000000003,24.422678333333337
Longitude : 87.86495833333332,87.864935,87.86492500000001
file name : Image_16052023103356230.png
|
2023-05-16 10:33:56.322529 |
641 |
56645568 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO FOJLE TOWARDS HAFIJ AT GHUSKIRA |
80000 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO FOJLE TOWARDS HAFIJ AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.4180468,24.4175121,24.41693462,24.41692336
Longitude : 87.8588119,87.8589463,87.85863805,87.85863937
file name : Image_07062023111849122.png
|
2023-06-07 11:18:49.212128 |
642 |
56645568 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO FOJLE TOWARDS HAFIJ AT GHUSKIRA |
80000 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO FOJLE TOWARDS HAFIJ AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.41698637,24.41684565,24.41685021
Longitude : 87.85854608,87.85866012,87.85865814
file name : Image_31052023114444649.png
|
2023-05-31 11:44:44.746771 |
643 |
56636444 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO SOKHU TO NAJRUL VIA DULAL TO NOUSAD AND ROFIKUL TOWARDS BAR |
119912 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO SOKHU TO NAJRUL VIA DULAL TO NOUSAD AND ROFIKUL TOWARDS BAR1 |
Roof laid |
-
latitude : 24.44678404,24.44669275,24.44674269
Longitude : 87.85099194,87.85098763,87.8510083
file name : Image_12062023114748764.png
|
2023-06-12 11:47:48.939764 |
644 |
56636444 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO SOKHU TO NAJRUL VIA DULAL TO NOUSAD AND ROFIKUL TOWARDS BAR |
119912 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO SOKHU TO NAJRUL VIA DULAL TO NOUSAD AND ROFIKUL TOWARDS BAR1 |
Completion of work |
-
latitude : 24.44673833333333,24.44672333333333,24.446695
Longitude : 87.85110666666667,87.85107500000001,87.851085
file name : Image_06062023112135388.png
|
2023-06-06 11:21:35.486043 |
645 |
56636444 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO SOKHU TO NAJRUL VIA DULAL TO NOUSAD AND ROFIKUL TOWARDS BAR |
119912 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO SOKHU TO NAJRUL VIA DULAL TO NOUSAD AND ROFIKUL TOWARDS BAR1 |
Completion of work |
-
latitude : 24.44682833333333,24.446836666666666,24.446788333333334
Longitude : 87.85105833333334,87.85105166666666,87.85106666666667
file name : Image_19052023142141031.png
|
2023-05-19 14:21:41.136054 |
646 |
56633246 |
CONS OF PUCCA DRAIN FROM HO MOHASIN MASTER TOWARDS MUNSOR MASTER AT DHITORA |
99600 |
CONS OF PUCCA DRAIN FROM HO MOHASIN MASTER TOWARDS MUNSOR MASTER AT DHITORA1 |
Plinth level |
-
latitude : 24.45727081,24.45725297
Longitude : 87.84896445,87.84896869
file name : Image_29052023114909866.png
|
2023-05-29 11:49:09.96356 |
647 |
56633246 |
CONS OF PUCCA DRAIN FROM HO MOHASIN MASTER TOWARDS MUNSOR MASTER AT DHITORA |
99600 |
CONS OF PUCCA DRAIN FROM HO MOHASIN MASTER TOWARDS MUNSOR MASTER AT DHITORA1 |
Completion of work |
-
latitude : 24.45723525,24.45728926,24.45728441
Longitude : 87.84899598,87.84898716,87.84898754
file name : Image_22052023142134583.png
|
2023-05-22 14:21:34.673609 |
648 |
56786993 |
CONSTRUCTION OF ROAD PROTECTION WALL BY BOUDER MASONRY AT DUM PUKUR AT PANIARA |
199935 |
CONSTRUCTION OF ROAD PROTECTION WALL BY BOUDER MASONRY AT DUM PUKUR AT PANIARA1 |
Roof laid |
-
latitude : 24.436281666666666
Longitude : 87.84585166666666
file name : Image_14062023132747089.png
|
2023-06-14 13:27:47.192862 |
649 |
56786993 |
CONSTRUCTION OF ROAD PROTECTION WALL BY BOUDER MASONRY AT DUM PUKUR AT PANIARA |
199935 |
CONSTRUCTION OF ROAD PROTECTION WALL BY BOUDER MASONRY AT DUM PUKUR AT PANIARA1 |
Plinth level |
-
latitude : 24.444394
Longitude : 87.8528666
file name : Image_15052023124018319.png
|
2023-05-15 12:40:18.437425 |
650 |
56786993 |
CONSTRUCTION OF ROAD PROTECTION WALL BY BOUDER MASONRY AT DUM PUKUR AT PANIARA |
199935 |
CONSTRUCTION OF ROAD PROTECTION WALL BY BOUDER MASONRY AT DUM PUKUR AT PANIARA1 |
Completion of work |
-
latitude : 24.43630876
Longitude : 87.84581219
file name : Image_18042023105638025.png
|
2023-04-18 10:56:38.122594 |
651 |
56903588 |
CONS OF PCC ROAD INC CALVERT FROM HO HANIF TOWARDS A B SIDDIK AT GHUSKIRA |
179986 |
CONS OF PCC ROAD INC CALVERT FROM HO HANIF TOWARDS A B SIDDIK AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.4219578,24.421959,24.4219415
Longitude : 87.8603572,87.8603603,87.8603449
file name : Image_07062023115638162.png
|
2023-06-07 11:56:38.272121 |
652 |
56903588 |
CONS OF PCC ROAD INC CALVERT FROM HO HANIF TOWARDS A B SIDDIK AT GHUSKIRA |
179986 |
CONS OF PCC ROAD INC CALVERT FROM HO HANIF TOWARDS A B SIDDIK AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.422466666666665,24.42249,24.422514999999997
Longitude : 87.86089500000001,87.86089166666667,87.86089166666667
file name : Image_16052023102246568.png
|
2023-05-16 10:22:46.682593 |
653 |
56787215 |
CONS OF WAITING SHED IN FORNT OF SHIB MANDIR AT MURARAI |
345000 |
CONS OF WAITING SHED IN FORNT OF SHIB MANDIR AT MURARAI |
Roof laid |
-
latitude : 24.43898
Longitude : 87.8574846
file name : Image_22062023161353396.png
|
2023-06-22 16:13:53.487207 |
654 |
56787215 |
CONS OF WAITING SHED IN FORNT OF SHIB MANDIR AT MURARAI |
345000 |
CONS OF WAITING SHED IN FORNT OF SHIB MANDIR AT MURARAI |
Plinth level |
-
latitude : 24.4389529
Longitude : 87.8573846
file name : Image_22062023160501104.png
|
2023-06-22 16:05:01.297499 |
655 |
56787215 |
CONS OF WAITING SHED IN FORNT OF SHIB MANDIR AT MURARAI |
345000 |
CONS OF WAITING SHED IN FORNT OF SHIB MANDIR AT MURARAI |
Completion of work |
-
latitude : 24.439138333333336
Longitude : 87.85735833333335
file name : Image_19062023152906837.png
|
2023-06-19 15:29:07.010944 |
656 |
56632862 |
CONS OF PCC ROAD INCL SIDE DRAIN FROM HO MOFIJUL TOWARDS HASANUR REZA AND OKTIYA MASJID TO MALEK AT |
149815 |
CONS OF PCC ROAD INCL SIDE DRAIN FROM HO MOFIJUL TOWARDS HASANUR REZA AND OKTIYA MASJID TO MALEK AT 1 |
Roof laid |
-
latitude : 24.45795736,24.45792925
Longitude : 87.84911712,87.84911619
file name : Image_14072023121219427.png
|
2023-07-14 12:12:19.525986 |
657 |
56632862 |
CONS OF PCC ROAD INCL SIDE DRAIN FROM HO MOFIJUL TOWARDS HASANUR REZA AND OKTIYA MASJID TO MALEK AT |
149815 |
CONS OF PCC ROAD INCL SIDE DRAIN FROM HO MOFIJUL TOWARDS HASANUR REZA AND OKTIYA MASJID TO MALEK AT 1 |
Plinth level |
-
latitude : 24.45799585,24.45799455
Longitude : 87.84912703,87.84912732
file name : Image_26062023132551931.png
|
2023-06-26 13:25:52.041022 |
658 |
56632862 |
CONS OF PCC ROAD INCL SIDE DRAIN FROM HO MOFIJUL TOWARDS HASANUR REZA AND OKTIYA MASJID TO MALEK AT |
149815 |
CONS OF PCC ROAD INCL SIDE DRAIN FROM HO MOFIJUL TOWARDS HASANUR REZA AND OKTIYA MASJID TO MALEK AT 1 |
Completion of work |
-
latitude : 24.45803492,24.45801414,24.45800491
Longitude : 87.84914153,87.84911358,87.84910326
file name : Image_26062023131342504.png
|
2023-06-26 13:13:42.62483 |
659 |
56903559 |
CONS OF MUKH AGNI NEAR PASCHIM PARA AT GHUSKIRA |
212214 |
CONS OF MUKH AGNI NEAR PASCHIM PARA AT GHUSKIRA 1 |
Roof laid |
-
latitude : 24.42044553
Longitude : 87.85432256
file name : Image_14072023113034585.png
|
2023-07-14 11:30:34.67826 |
660 |
56903559 |
CONS OF MUKH AGNI NEAR PASCHIM PARA AT GHUSKIRA |
212214 |
CONS OF MUKH AGNI NEAR PASCHIM PARA AT GHUSKIRA 1 |
Plinth level |
-
latitude : 24.42046165
Longitude : 87.85431527
file name : Image_14072023112700106.png
|
2023-07-14 11:27:00.196934 |
661 |
56903559 |
CONS OF MUKH AGNI NEAR PASCHIM PARA AT GHUSKIRA |
212214 |
CONS OF MUKH AGNI NEAR PASCHIM PARA AT GHUSKIRA 1 |
Completion of work |
-
latitude : 24.42037456
Longitude : 87.85424284
file name : Image_24052023120529069.png
|
2023-05-24 12:05:29.175261 |
662 |
56903439 |
CONS OF PCC ROAD FROM HO N RABIDAS TO S RABIDAS VIA NITAI TO DHONI AND JOYDEB TO K RABIDAS LANE AT |
99000 |
CONS OF PCC ROAD FROM HO N RABIDAS TO S RABIDAS VIA NITAI TO DHONI AND JOYDEB TO K RABIDAS LANE AT 1 |
Roof laid |
-
latitude : 24.43509485,24.43508119,24.43510092
Longitude : 87.87191732,87.87188417,87.8719405
file name : Image_01082023133633967.png
|
2023-08-01 13:36:34.065136 |
663 |
56903439 |
CONS OF PCC ROAD FROM HO N RABIDAS TO S RABIDAS VIA NITAI TO DHONI AND JOYDEB TO K RABIDAS LANE AT |
99000 |
CONS OF PCC ROAD FROM HO N RABIDAS TO S RABIDAS VIA NITAI TO DHONI AND JOYDEB TO K RABIDAS LANE AT 1 |
Plinth level |
-
latitude : 24.43509388,24.43511295,24.43512171
Longitude : 87.87186754,87.87186628,87.87185543
file name : Image_24072023135645447.png
|
2023-07-24 13:56:45.551759 |
664 |
56903439 |
CONS OF PCC ROAD FROM HO N RABIDAS TO S RABIDAS VIA NITAI TO DHONI AND JOYDEB TO K RABIDAS LANE AT |
99000 |
CONS OF PCC ROAD FROM HO N RABIDAS TO S RABIDAS VIA NITAI TO DHONI AND JOYDEB TO K RABIDAS LANE AT 1 |
Completion of work |
-
latitude : 24.43505823,24.43508391
Longitude : 87.87191959,87.87189864
file name : Image_17072023124210674.png
|
2023-07-17 12:42:10.795517 |
665 |
56643218 |
INSTALLATION OF SUB MARSIBLE PUMP INC WATER TANK WITH PIPE LINE AT KARTIK TOLA AT BHADISWAR |
149954 |
INSTALLATION OF SUB MARSIBLE PUMP INC WATER TANK WITH PIPE LINE AT KARTIK TOLA AT BHADISWAR1 |
Roof laid |
-
latitude : 24.44200173
Longitude : 87.86595109
file name : Image_20072023133751550.png
|
2023-07-20 13:37:52.57457 |
666 |
56643218 |
INSTALLATION OF SUB MARSIBLE PUMP INC WATER TANK WITH PIPE LINE AT KARTIK TOLA AT BHADISWAR |
149954 |
INSTALLATION OF SUB MARSIBLE PUMP INC WATER TANK WITH PIPE LINE AT KARTIK TOLA AT BHADISWAR1 |
Plinth level |
-
latitude : 24.44195301
Longitude : 87.86596252
file name : Image_20072023133148946.png
|
2023-07-20 13:31:49.077012 |
667 |
56643218 |
INSTALLATION OF SUB MARSIBLE PUMP INC WATER TANK WITH PIPE LINE AT KARTIK TOLA AT BHADISWAR |
149954 |
INSTALLATION OF SUB MARSIBLE PUMP INC WATER TANK WITH PIPE LINE AT KARTIK TOLA AT BHADISWAR1 |
Completion of work |
-
latitude : 24.44192333333334
Longitude : 87.86596499999999
file name : Image_17052023135519940.png
|
2023-05-17 13:55:20.060202 |
668 |
56903795 |
CONS OF PCC ROAD INCL CHATAL IN ID GAHA AT DADPUR |
99600 |
CONS OF PCC ROAD INCL CHATAL IN ID GAHA AT DADPUR1 |
Plinth level |
-
latitude : 24.408189999999998,24.40800166666667
Longitude : 87.86407166666667,87.86393833333335
file name : Image_06072023105929231.png
|
2023-07-06 10:59:29.342643 |
669 |
56903795 |
CONS OF PCC ROAD INCL CHATAL IN ID GAHA AT DADPUR |
99600 |
CONS OF PCC ROAD INCL CHATAL IN ID GAHA AT DADPUR1 |
Completion of work |
-
latitude : 24.408500000000004,24.408496666666665,24.408501666666666
Longitude : 87.86422833333333,87.86419499999998,87.864175
file name : Image_05072023174337998.png
|
2023-07-05 17:43:38.137252 |
670 |
56894416 |
CONS OF WAITING SHED INFORNT SAHABA KHANA JANAZA PLACE AT BHADOSWAR |
299638 |
CONS OF WAITING SHED INFORNT SAHABA KHANA JANAZA PLACE AT BHADOSWAR1 |
Plinth level |
-
latitude : 24.43737311
Longitude : 87.86341748
file name : Image_24072023115902631.png
|
2023-07-24 11:59:02.730255 |
671 |
56894416 |
CONS OF WAITING SHED INFORNT SAHABA KHANA JANAZA PLACE AT BHADOSWAR |
299638 |
CONS OF WAITING SHED INFORNT SAHABA KHANA JANAZA PLACE AT BHADOSWAR1 |
Completion of work |
-
latitude : 24.441899
Longitude : 87.8579567
file name : Image_16052023125623131.png
|
2023-05-16 12:56:23.232947 |
672 |
56643496 |
INSTALLATION OF SUB MARSIBLE PUMP INC WATER TANK WITH PIPE LINE DURGA MANDIR AT BHADISWAR |
99600 |
INSTALLATION OF SUB MARSIBLE PUMP INC WATER TANK WITH PIPE LINE DURGA MANDIR AT BHADISWAR1 |
Plinth level |
-
latitude : 24.4397047
Longitude : 87.862813
file name : Image_01082023125842525.png
|
2023-08-01 12:58:42.619585 |
673 |
56643496 |
INSTALLATION OF SUB MARSIBLE PUMP INC WATER TANK WITH PIPE LINE DURGA MANDIR AT BHADISWAR |
99600 |
INSTALLATION OF SUB MARSIBLE PUMP INC WATER TANK WITH PIPE LINE DURGA MANDIR AT BHADISWAR1 |
Completion of work |
-
latitude : 24.4397209
Longitude : 87.8631023
file name : Image_17072023122514840.png
|
2023-07-17 12:25:14.958527 |
674 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
Roof laid |
-
latitude : 24.416893333333338
Longitude : 87.85891000000001
file name : Image_03082023175210718.png
|
2023-08-03 17:52:10.813671 |
675 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
Plinth level |
-
latitude : 24.416828333333335
Longitude : 87.85884666666668
file name : Image_01082023173220968.png
|
2023-08-01 17:32:21.092271 |
676 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
Completion of work |
-
latitude : 24.43399675
Longitude : 87.86861753
file name : Image_24072023133152452.png
|
2023-07-24 13:31:52.575927 |
677 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP2 |
Roof laid |
-
latitude : 24.4171579
Longitude : 87.8589999
file name : Image_03082023175355935.png
|
2023-08-03 17:53:56.028294 |
678 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP2 |
Plinth level |
-
latitude : 24.4171603
Longitude : 87.858998
file name : Image_03082023094000540.png
|
2023-08-03 09:40:00.649482 |
679 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP2 |
Completion of work |
-
latitude : 24.4172215
Longitude : 87.8591828
file name : Image_01082023173310719.png
|
2023-08-01 17:33:10.831287 |
680 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP3 |
Roof laid |
-
latitude : 24.417029
Longitude : 87.8590606
file name : Image_03082023175450097.png
|
2023-08-03 17:54:50.226577 |
681 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP3 |
Plinth level |
-
latitude : 24.4171639
Longitude : 87.8589943
file name : Image_03082023094055454.png
|
2023-08-03 09:40:55.757709 |
682 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP3 |
Completion of work |
-
latitude : 24.417226
Longitude : 87.8591809
file name : Image_01082023173417340.png
|
2023-08-01 17:34:17.445328 |
683 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP3 |
Completion of work |
-
latitude : 24.41725666666667
Longitude : 87.85768666666667
file name : Image_31072023170342483.png
|
2023-07-31 17:03:42.673786 |
684 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP4 |
Roof laid |
-
latitude : 24.41671666666667
Longitude : 87.85886833333333
file name : Image_03082023175532358.png
|
2023-08-03 17:55:32.453018 |
685 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP4 |
Plinth level |
-
latitude : 24.4171595
Longitude : 87.8589942
file name : Image_03082023094150102.png
|
2023-08-03 09:41:50.222649 |
686 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP4 |
Completion of work |
-
latitude : 24.416739999999997
Longitude : 87.85902833333333
file name : Image_01082023173547429.png
|
2023-08-01 17:35:47.542806 |
687 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP4 |
Completion of work |
-
latitude : 24.416964999999998
Longitude : 87.85780833333335
file name : Image_31072023170920879.png
|
2023-07-31 17:09:20.974252 |
688 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP5 |
Roof laid |
-
latitude : 24.4170505
Longitude : 87.8590522
file name : Image_03082023175637215.png
|
2023-08-03 17:56:37.336174 |
689 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP5 |
Plinth level |
-
latitude : 24.4171579
Longitude : 87.8589999
file name : Image_03082023094452586.png
|
2023-08-03 09:44:52.69617 |
690 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP5 |
Completion of work |
-
latitude : 24.416711666666668
Longitude : 87.85904166666666
file name : Image_01082023173641519.png
|
2023-08-01 17:36:41.638307 |
691 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP5 |
Completion of work |
-
latitude : 24.416948333333334
Longitude : 87.85781999999999
file name : Image_31072023171004876.png
|
2023-07-31 17:10:04.970058 |
692 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP6 |
Roof laid |
-
latitude : 24.4170505
Longitude : 87.8590522
file name : Image_03082023175723035.png
|
2023-08-03 17:57:23.162516 |
693 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP6 |
Plinth level |
-
latitude : 24.4171583
Longitude : 87.8589887
file name : Image_03082023095047427.png
|
2023-08-03 09:50:47.532736 |
694 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP6 |
Completion of work |
-
latitude : 24.4172605
Longitude : 87.8591795
file name : Image_01082023173852599.png
|
2023-08-01 17:38:52.701115 |
695 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP6 |
Completion of work |
-
latitude : 24.416990000000002
Longitude : 87.85828166666667
file name : Image_31072023171157945.png
|
2023-07-31 17:11:58.044951 |
696 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP6 |
Completion of work |
-
latitude : 24.416925
Longitude : 87.85824833333332
file name : Image_31072023171526434.png
|
2023-07-31 17:15:26.5588 |
697 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP7 |
Roof laid |
-
latitude : 24.4171627
Longitude : 87.8589936
file name : Image_03082023175800952.png
|
2023-08-03 17:58:01.045142 |
698 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP7 |
Plinth level |
-
latitude : 24.4171559
Longitude : 87.8589858
file name : Image_03082023095132510.png
|
2023-08-03 09:51:32.613993 |
699 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP7 |
Completion of work |
-
latitude : 24.4172495
Longitude : 87.8591176
file name : Image_01082023174021533.png
|
2023-08-01 17:40:21.687191 |
700 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP7 |
Completion of work |
-
latitude : 24.4172495
Longitude : 87.8591176
file name : Image_01082023174028172.png
|
2023-08-01 17:40:28.326201 |
701 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP7 |
Completion of work |
-
latitude : 24.416925
Longitude : 87.85824666666667
file name : Image_31072023171611333.png
|
2023-07-31 17:16:11.435247 |
702 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP8 |
Roof laid |
-
latitude : 24.4171627
Longitude : 87.8589936
file name : Image_03082023175842574.png
|
2023-08-03 17:58:42.669678 |
703 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP8 |
Plinth level |
-
latitude : 24.4171614
Longitude : 87.8589954
file name : Image_03082023095237531.png
|
2023-08-03 09:52:37.670407 |
704 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP8 |
Completion of work |
-
latitude : 24.41699833333333
Longitude : 87.85825500000001
file name : Image_01082023174152174.png
|
2023-08-01 17:41:52.28393 |
705 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP8 |
Completion of work |
-
latitude : 24.41708833333333
Longitude : 87.85778833333333
file name : Image_01082023174359193.png
|
2023-08-01 17:43:59.298591 |
706 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP8 |
Completion of work |
-
latitude : 24.416888333333336
Longitude : 87.85863166666668
file name : Image_31072023171742076.png
|
2023-07-31 17:17:42.183113 |
707 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP9 |
Roof laid |
-
latitude : 24.4171627
Longitude : 87.8589936
file name : Image_03082023175932877.png
|
2023-08-03 17:59:32.982646 |
708 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP9 |
Plinth level |
-
latitude : 24.41670166666667
Longitude : 87.858945
file name : Image_03082023095355114.png
|
2023-08-03 09:53:55.255084 |
709 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP9 |
Completion of work |
-
latitude : 24.417321666666666
Longitude : 87.85775333333335
file name : Image_01082023174536510.png
|
2023-08-01 17:45:36.637184 |
710 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP9 |
Completion of work |
-
latitude : 24.41689
Longitude : 87.858625
file name : Image_31072023172128976.png
|
2023-07-31 17:21:29.08103 |
711 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP9 |
Completion of work |
-
latitude : 24.416873333333335
Longitude : 87.858625
file name : Image_31072023172224390.png
|
2023-07-31 17:22:24.481606 |
712 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP10 |
Roof laid |
-
latitude : 24.4171208
Longitude : 87.8590151
file name : Image_03082023180236578.png
|
2023-08-03 18:02:36.684748 |
713 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP10 |
Plinth level |
-
latitude : 24.4171559
Longitude : 87.8589858
file name : Image_03082023095535781.png
|
2023-08-03 09:55:35.888393 |
714 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP10 |
Completion of work |
-
latitude : 24.41725
Longitude : 87.85774500000001
file name : Image_01082023174643556.png
|
2023-08-01 17:46:43.663222 |
715 |
56892033 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP |
100000 |
REPAIRING OF SOLAR LIGHT INC INSTALLATION BUTTERY VARIOUS LOCATION UNDER MURARAI GP10 |
Completion of work |
-
latitude : 24.41676166666667
Longitude : 87.85892833333334
file name : Image_31072023172414535.png
|
2023-07-31 17:24:14.624121 |
716 |
56644572 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO KRISHNA TO PCC VIA SANTOSH TO RAMPRPSAD AT GOPALPUR |
50000 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO KRISHNA TO PCC VIA SANTOSH TO RAMPRPSAD AT GOPALPUR1 |
Plinth level |
-
latitude : 24.43475217,24.43474954,24.43475608
Longitude : 87.86905886,87.86906085,87.86906297
file name : Image_07082023131848878.png
|
2023-08-07 13:18:49.640972 |
717 |
56644572 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO KRISHNA TO PCC VIA SANTOSH TO RAMPRPSAD AT GOPALPUR |
50000 |
CONS PUCCA DRAIN WITH COVER SLAB FROM HO KRISHNA TO PCC VIA SANTOSH TO RAMPRPSAD AT GOPALPUR1 |
Completion of work |
-
latitude : 24.4344636,24.43470274,24.43474354
Longitude : 87.8649495,87.86907965,87.86908936
file name : Image_17072023123343135.png
|
2023-07-17 12:33:43.227331 |
718 |
56630966 |
CONS PUCCA HIGH DRAIN WITH COVER SLAB NEAR SHIB KALI MANDIR AT RABIDAS PARA |
163973 |
CONS PUCCA HIGH DRAIN WITH COVER SLAB NEAR SHIB KALI MANDIR AT RABIDAS PARA1 |
Plinth level |
-
latitude : 24.4571446,24.4614307,24.45785747,24.45786023
Longitude : 87.8577441,87.8560497,87.85756979,87.85757032
file name : Image_25072023130323167.png
|
2023-07-25 13:03:23.246237 |
719 |
56630966 |
CONS PUCCA HIGH DRAIN WITH COVER SLAB NEAR SHIB KALI MANDIR AT RABIDAS PARA |
163973 |
CONS PUCCA HIGH DRAIN WITH COVER SLAB NEAR SHIB KALI MANDIR AT RABIDAS PARA1 |
Completion of work |
-
latitude : 24.457978333333337,24.457990000000002,24.457988333333333
Longitude : 87.85745999999999,87.85750000000002,87.85746833333333
file name : Image_16052023121819222.png
|
2023-05-16 12:18:19.35333 |
720 |
56903506 |
CONST OF ROAD PROTECTION WALL BY BOUDER MASONRY AT MATRA PUKUR AT MATRA PARA |
199968 |
CONST OF ROAD PROTECTION WALL BY BOUDER MASONRY AT MATRA PUKUR AT MATRA PARA1 |
Plinth level |
-
latitude : 24.43332752
Longitude : 87.86849706
file name : Image_01082023131215003.png
|
2023-08-01 13:12:15.136597 |
721 |
56903506 |
CONST OF ROAD PROTECTION WALL BY BOUDER MASONRY AT MATRA PUKUR AT MATRA PARA |
199968 |
CONST OF ROAD PROTECTION WALL BY BOUDER MASONRY AT MATRA PUKUR AT MATRA PARA1 |
Completion of work |
-
latitude : 24.43317833333333
Longitude : 87.86847000000002
file name : Image_06062023174409077.png
|
2023-06-06 17:44:09.174106 |
722 |
56891467 |
INST OF SOLAR S LIGHT NEAR HO MANOJ NOBA DUTTA RITA PANDIT TINKU SK MUSTAK FIROJ SK R KALI MANDIR BU |
99600 |
INST OF SOLAR S LIGHT NEAR HO MANOJ NOBA DUTTA RITA PANDIT TINKU SK MUSTAK FIROJ SK R KALI MANDIR BU1 |
Roof laid |
-
latitude : 24.43923333333333
Longitude : 87.85730666666664
file name : Image_07082023154219622.png
|
2023-08-07 15:42:19.735101 |
723 |
56891467 |
INST OF SOLAR S LIGHT NEAR HO MANOJ NOBA DUTTA RITA PANDIT TINKU SK MUSTAK FIROJ SK R KALI MANDIR BU |
99600 |
INST OF SOLAR S LIGHT NEAR HO MANOJ NOBA DUTTA RITA PANDIT TINKU SK MUSTAK FIROJ SK R KALI MANDIR BU1 |
Plinth level |
-
latitude : 24.439133333333334
Longitude : 87.85734499999998
file name : Image_07082023153602682.png
|
2023-08-07 15:36:02.812245 |
724 |
56891467 |
INST OF SOLAR S LIGHT NEAR HO MANOJ NOBA DUTTA RITA PANDIT TINKU SK MUSTAK FIROJ SK R KALI MANDIR BU |
99600 |
INST OF SOLAR S LIGHT NEAR HO MANOJ NOBA DUTTA RITA PANDIT TINKU SK MUSTAK FIROJ SK R KALI MANDIR BU1 |
Completion of work |
-
latitude : 24.4390379
Longitude : 87.8572282
file name : Image_07082023124632428.png
|
2023-08-07 12:46:32.608012 |
725 |
56786762 |
MAINTANENCE OF SOLAR STREET LIGHT VARIOUS LOCATION UNDER MURARAI GP |
100000 |
MAINTANENCE OF SOLAR STREET LIGHT VARIOUS LOCATION UNDER MURARAI GP1 |
Roof laid |
-
latitude : 24.4402717
Longitude : 87.8563123
file name : Image_04082023164307396.png
|
2023-08-04 16:43:07.494981 |
726 |
56786762 |
MAINTANENCE OF SOLAR STREET LIGHT VARIOUS LOCATION UNDER MURARAI GP |
100000 |
MAINTANENCE OF SOLAR STREET LIGHT VARIOUS LOCATION UNDER MURARAI GP1 |
Plinth level |
-
latitude : 24.4402733
Longitude : 87.8563199
file name : Image_04082023164040118.png
|
2023-08-04 16:40:40.215527 |
727 |
56786762 |
MAINTANENCE OF SOLAR STREET LIGHT VARIOUS LOCATION UNDER MURARAI GP |
100000 |
MAINTANENCE OF SOLAR STREET LIGHT VARIOUS LOCATION UNDER MURARAI GP1 |
Completion of work |
-
latitude : 24.4402783
Longitude : 87.8563143
file name : Image_04082023163715892.png
|
2023-08-04 16:37:15.974224 |
728 |
56635639 |
INSTALLATION OF SUBMARSIBLE PUMP INCL WAITING SHED NEAR NETAJI CLUB KALI MANDIR AT MURARAI |
150000 |
INSTALLATION OF SUBMARSIBLE PUMP INCL WAITING SHED NEAR NETAJI CLUB KALI MANDIR AT MURARAI1 |
Plinth level |
-
latitude : 24.4391795
Longitude : 87.8565602
file name : Image_07082023155329148.png
|
2023-08-07 15:53:29.278747 |
729 |
56635639 |
INSTALLATION OF SUBMARSIBLE PUMP INCL WAITING SHED NEAR NETAJI CLUB KALI MANDIR AT MURARAI |
150000 |
INSTALLATION OF SUBMARSIBLE PUMP INCL WAITING SHED NEAR NETAJI CLUB KALI MANDIR AT MURARAI1 |
Completion of work |
-
latitude : 24.4391795
Longitude : 87.8565602
file name : Image_07082023154908125.png
|
2023-08-07 15:49:08.244764 |
730 |
56636602 |
CONS COVER SLAB ON EXITING PUCCA DRAIN AT MOHULLA DANGA |
99600 |
CONS COVER SLAB ON EXITING PUCCA DRAIN AT MOHULLA DANGA1 |
Roof laid |
-
latitude : 24.4401193,24.4401193
Longitude : 87.8563158,87.8563158
file name : Image_29092023145608847.png
|
2023-09-29 14:56:09.033452 |
731 |
56636602 |
CONS COVER SLAB ON EXITING PUCCA DRAIN AT MOHULLA DANGA |
99600 |
CONS COVER SLAB ON EXITING PUCCA DRAIN AT MOHULLA DANGA1 |
Plinth level |
-
latitude : 24.4401193,24.4401193,24.4401193
Longitude : 87.8563158,87.8563158,87.8563158
file name : Image_29092023144821856.png
|
2023-09-29 14:48:21.948831 |
732 |
56636602 |
CONS COVER SLAB ON EXITING PUCCA DRAIN AT MOHULLA DANGA |
99600 |
CONS COVER SLAB ON EXITING PUCCA DRAIN AT MOHULLA DANGA1 |
Plinth level |
-
latitude : 24.440315000000002,24.440305,24.440303333333336
Longitude : 87.843625,87.84362000000002,87.84361166666667
file name : Image_19092023131524260.png
|
2023-09-19 13:15:24.396533 |
733 |
56636602 |
CONS COVER SLAB ON EXITING PUCCA DRAIN AT MOHULLA DANGA |
99600 |
CONS COVER SLAB ON EXITING PUCCA DRAIN AT MOHULLA DANGA1 |
Completion of work |
-
latitude : 24.440319999999996,24.440301666666663,24.440348333333336
Longitude : 87.84337500000001,87.84339999999999,87.84336
file name : Image_18092023122300661.png
|
2023-09-18 12:23:00.764041 |
734 |
56787021 |
CONS OF PCC ROAD FROM PITCH TO JAMIYAT HOUSE VIA TOUFIK HOUSE AT LD PARA |
99000 |
CONS OF PCC ROAD FROM PITCH TO JAMIYAT HOUSE VIA TOUFIK HOUSE AT LD PARA1 |
Roof laid |
-
latitude : 24.4492102,24.4492106,24.4492102
Longitude : 87.8522041,87.8522037,87.8522042
file name : Image_26092023112622975.png
|
2023-09-26 11:26:23.070023 |
735 |
56787021 |
CONS OF PCC ROAD FROM PITCH TO JAMIYAT HOUSE VIA TOUFIK HOUSE AT LD PARA |
99000 |
CONS OF PCC ROAD FROM PITCH TO JAMIYAT HOUSE VIA TOUFIK HOUSE AT LD PARA1 |
Plinth level |
-
latitude : 24.44900189,24.44899309,24.4489791,24.44899954
Longitude : 87.85198227,87.85197377,87.85198177,87.8519702
file name : Image_13092023112257909.png
|
2023-09-13 11:22:58.001548 |
736 |
56787021 |
CONS OF PCC ROAD FROM PITCH TO JAMIYAT HOUSE VIA TOUFIK HOUSE AT LD PARA |
99000 |
CONS OF PCC ROAD FROM PITCH TO JAMIYAT HOUSE VIA TOUFIK HOUSE AT LD PARA1 |
Completion of work |
-
latitude : 24.44904,24.4491794,24.4491794,24.4491851
Longitude : 87.852345,87.8522382,87.8522382,87.8521604
file name : Image_24072023160851601.png
|
2023-07-24 16:08:52.371881 |
737 |
56635118 |
CONS OF PCC ROAD INCL DRAIN FROM HO BHUTU DUTTA TOWARDS SMRITI AT MURARAI |
149964 |
CONS OF PCC ROAD INCL DRAIN FROM HO BHUTU DUTTA TOWARDS SMRITI AT MURARAI1 |
Plinth level |
-
latitude : 24.43785833333333,24.437895000000005,24.437928333333335
Longitude : 87.85621,87.85618833333335,87.856215
file name : Image_19092023132118420.png
|
2023-09-19 13:21:18.536473 |
738 |
56635118 |
CONS OF PCC ROAD INCL DRAIN FROM HO BHUTU DUTTA TOWARDS SMRITI AT MURARAI |
149964 |
CONS OF PCC ROAD INCL DRAIN FROM HO BHUTU DUTTA TOWARDS SMRITI AT MURARAI1 |
Completion of work |
-
latitude : 24.43795967,24.43797158,24.437966
Longitude : 87.85640292,87.85641421,87.85641035
file name : Image_04092023124520074.png
|
2023-09-04 12:45:20.168909 |
739 |
68144982 |
Extension of existing pipeline |
69957 |
Extension of existing pipeline1 |
Roof laid |
-
latitude : 24.457916666666666,24.457925
Longitude : 87.84553666666667,87.84557166666667
file name : Image_19012024113328722.png
|
2024-01-19 11:33:28.802666 |
740 |
68144982 |
Extension of existing pipeline |
69957 |
Extension of existing pipeline1 |
Plinth level |
-
latitude : 24.458099999999998,24.458023333333337
Longitude : 87.84603999999999,87.84608833333331
file name : Image_19012024112857737.png
|
2024-01-19 11:28:57.846296 |
741 |
68144982 |
Extension of existing pipeline |
69957 |
Extension of existing pipeline1 |
Completion of work |
-
latitude : 24.45811,24.458068333333337
Longitude : 87.84604666666668,87.84602000000001
file name : Image_19012024112456380.png
|
2024-01-19 11:24:56.470189 |
742 |
67517349 |
Construction of Building |
150000 |
Construction of Building1 |
Roof laid |
-
latitude : 24.4401757
Longitude : 87.8563064
file name : Image_10012024165305749.png
|
2024-01-10 16:53:05.858805 |
743 |
67517349 |
Construction of Building |
150000 |
Construction of Building1 |
Plinth level |
-
latitude : 24.4401673
Longitude : 87.8562999
file name : Image_10012024164702449.png
|
2024-01-10 16:47:02.529347 |
744 |
67517349 |
Construction of Building |
150000 |
Construction of Building1 |
Plinth level |
-
latitude : 24.4401819
Longitude : 87.8563117
file name : Image_10012024164659120.png
|
2024-01-10 16:46:59.201665 |
745 |
67517349 |
Construction of Building |
150000 |
Construction of Building1 |
Plinth level |
-
latitude : 24.4401656
Longitude : 87.8563063
file name : Image_10012024164655400.png
|
2024-01-10 16:46:55.497617 |
746 |
67517349 |
Construction of Building |
150000 |
Construction of Building1 |
Plinth level |
-
latitude : 24.4401608
Longitude : 87.8563029
file name : Image_10012024164652064.png
|
2024-01-10 16:46:52.20779 |
747 |
67517349 |
Construction of Building |
150000 |
Construction of Building1 |
Completion of work |
-
latitude : 24.44017
Longitude : 87.8563042
file name : Image_10012024163939040.png
|
2024-01-10 16:39:39.130897 |
748 |
68100380 |
Operation and Maintenance of drinking water supply system |
350000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 24.4401715
Longitude : 87.8563174
file name : Image_08012024125031659.png
|
2024-01-08 12:50:31.739228 |
749 |
68100380 |
Operation and Maintenance of drinking water supply system |
350000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 24.4401705
Longitude : 87.8563257
file name : Image_08012024124710079.png
|
2024-01-08 12:47:10.156804 |
750 |
68100380 |
Operation and Maintenance of drinking water supply system |
350000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.4401698
Longitude : 87.856328
file name : Image_08012024124151312.png
|
2024-01-08 12:41:51.40194 |
751 |
68108954 |
Operation and Maintenance of drinking water supply system |
200000 |
Operation and Maintenance of drinking water supply system |
Roof laid |
-
latitude : 24.4401612
Longitude : 87.8563108
file name : Image_28122023130711845.png
|
2023-12-28 13:07:11.93928 |
752 |
68108954 |
Operation and Maintenance of drinking water supply system |
200000 |
Operation and Maintenance of drinking water supply system |
Plinth level |
-
latitude : 24.441454999999998
Longitude : 87.85679999999999
file name : Image_28122023130231535.png
|
2023-12-28 13:02:31.641968 |
753 |
68108954 |
Operation and Maintenance of drinking water supply system |
200000 |
Operation and Maintenance of drinking water supply system |
Completion of work |
-
latitude : 24.4401681
Longitude : 87.856311
file name : Image_28122023125513004.png
|
2023-12-28 12:55:13.099223 |
754 |
68109561 |
Operation and Maintenance of drinking water supply system |
200000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 24.4393262
Longitude : 87.8564136
file name : Image_16042024122016848.png
|
2024-04-16 12:20:16.931232 |
755 |
68109561 |
Operation and Maintenance of drinking water supply system |
200000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 24.4394048
Longitude : 87.8563816
file name : Image_16042024121520399.png
|
2024-04-16 12:15:20.490362 |
756 |
68109561 |
Operation and Maintenance of drinking water supply system |
200000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.4395041
Longitude : 87.8563507
file name : Image_16042024120842220.png
|
2024-04-16 12:08:42.315772 |
757 |
56630057 |
INSTALLATION OF SUB MARSIBLE PUMP INCL PIPE LINE AT DOMA POND NEAR KABARSTAN GATE |
169716 |
INSTALLATION OF SUB MARSIBLE PUMP INCL PIPE LINE AT DOMA POND NEAR KABARSTAN GATE1 |
Roof laid |
-
latitude : 24.440219
Longitude : 87.856316
file name : Image_26062023122037473.png
|
2023-06-26 12:20:37.610406 |
758 |
56630057 |
INSTALLATION OF SUB MARSIBLE PUMP INCL PIPE LINE AT DOMA POND NEAR KABARSTAN GATE |
169716 |
INSTALLATION OF SUB MARSIBLE PUMP INCL PIPE LINE AT DOMA POND NEAR KABARSTAN GATE1 |
Plinth level |
-
latitude : 24.440219
Longitude : 87.856316
file name : Image_26062023121456055.png
|
2023-06-26 12:14:56.159578 |
759 |
56630057 |
INSTALLATION OF SUB MARSIBLE PUMP INCL PIPE LINE AT DOMA POND NEAR KABARSTAN GATE |
169716 |
INSTALLATION OF SUB MARSIBLE PUMP INCL PIPE LINE AT DOMA POND NEAR KABARSTAN GATE1 |
Completion of work |
-
latitude : 24.440219
Longitude : 87.856316
file name : Image_26062023120753555.png
|
2023-06-26 12:07:53.718137 |
760 |
67515779 |
Repairing and maintenance of roads |
200000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 24.4395916,24.4396219
Longitude : 87.8548808,87.854785
file name : Image_01022024130355874.png
|
2024-02-01 13:03:55.973555 |
761 |
67515779 |
Repairing and maintenance of roads |
200000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 24.439462,24.439462
Longitude : 87.8546995,87.8546995
file name : Image_01022024130101379.png
|
2024-02-01 13:01:01.462646 |
762 |
67515779 |
Repairing and maintenance of roads |
200000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 24.4393758,24.4395007
Longitude : 87.8546324,87.8547119
file name : Image_01022024125549692.png
|
2024-02-01 12:55:49.779506 |
763 |
67517676 |
Installation of Computer with Internet facility |
100000 |
Installation of Computer with Internet facility1 |
|
-
latitude : 24.4402771
Longitude : 87.8563331
file name : Image_01022024164135874.png
|
2024-02-01 16:41:35.960088 |
764 |
67536152 |
Construction of roads |
149958 |
Construction of roads1 |
Roof laid |
-
latitude : 24.42056942,24.42055718,24.42054023,24.42050714
Longitude : 87.85398147,87.85398501,87.85397468,87.85385201
file name : Image_18122023133816942.png
|
2023-12-18 13:38:17.054901 |
765 |
67536152 |
Construction of roads |
149958 |
Construction of roads1 |
Plinth level |
-
latitude : 24.42068497,24.42068713
Longitude : 87.85412395,87.85411913
file name : Image_13122023122606931.png
|
2023-12-13 12:26:07.027422 |
766 |
67536152 |
Construction of roads |
149958 |
Construction of roads1 |
Completion of work |
-
latitude : 24.42066947,24.42066429,24.42067566
Longitude : 87.85405332,87.85406034,87.85406184
file name : Image_13122023121902844.png
|
2023-12-13 12:19:02.949671 |
767 |
67519915 |
Construction of roads |
99987 |
Construction of roads1 |
Roof laid |
-
latitude : 24.46198946,24.4619068,24.46192615
Longitude : 87.86491337,87.86500268,87.8650034
file name : Image_26122023121938454.png
|
2023-12-26 12:19:38.5555 |
768 |
67519915 |
Construction of roads |
99987 |
Construction of roads1 |
Plinth level |
-
latitude : 24.46191729,24.46195256,24.46196475,24.46196965,24.4619732
Longitude : 87.86498875,87.86503208,87.86499579,87.86498814,87.8649883
file name : Image_21122023130449760.png
|
2023-12-21 13:04:49.859044 |
769 |
67519915 |
Construction of roads |
99987 |
Construction of roads1 |
Completion of work |
-
latitude : 24.46199166666667,24.461935
Longitude : 87.86496166666666,87.86506
file name : Image_19122023164156313.png
|
2023-12-19 16:41:56.400283 |
770 |
67519791 |
Construction of roads |
99984 |
Construction of roads1 |
Roof laid |
-
latitude : 24.46162717,24.46168893,24.46170381
Longitude : 87.86536993,87.86531939,87.86531618
file name : Image_26122023122307508.png
|
2023-12-26 12:23:06.892741 |
771 |
67519791 |
Construction of roads |
99984 |
Construction of roads1 |
Plinth level |
-
latitude : 24.4648486,24.46148203,24.46149124,24.46150275
Longitude : 87.8615739,87.86569677,87.86568716,87.8656754
file name : Image_22122023113928443.png
|
2023-12-22 11:39:28.545454 |
772 |
67519791 |
Construction of roads |
99984 |
Construction of roads1 |
Completion of work |
-
latitude : 24.461668333333332,24.46161833333333
Longitude : 87.86538333333334,87.86548666666667
file name : Image_19122023163728742.png
|
2023-12-19 16:37:28.829065 |
773 |
67524352 |
Construction of roads |
79958 |
Construction of roads1 |
Roof laid |
-
latitude : 24.4422555,24.4421803
Longitude : 87.8516392,87.8516912
file name : Image_11032024161802448.png
|
2024-03-11 16:18:02.537109 |
774 |
67524352 |
Construction of roads |
79958 |
Construction of roads1 |
Plinth level |
-
latitude : 24.442196,24.4421962
Longitude : 87.8516899,87.8516895
file name : Image_04032024120651874.png
|
2024-03-04 12:06:51.991972 |
775 |
67524352 |
Construction of roads |
79958 |
Construction of roads1 |
Completion of work |
-
latitude : 24.44218,24.442263333333337
Longitude : 87.85177666666665,87.85167166666666
file name : Image_16012024164147918.png
|
2024-01-16 16:41:47.998699 |
776 |
68170047 |
Creation of drainage channel for management of grey water |
99975 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.443426666666664
Longitude : 87.85300333333335
file name : Image_18012024150626686.png
|
2024-01-18 15:06:26.792515 |
777 |
68170047 |
Creation of drainage channel for management of grey water |
99975 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.449853333333333
Longitude : 87.84444666666668
file name : Image_18012024150026153.png
|
2024-01-18 15:00:26.231555 |
778 |
68170047 |
Creation of drainage channel for management of grey water |
99975 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.4443628
Longitude : 87.852893
file name : Image_02012024113422883.png
|
2024-01-02 11:34:22.99615 |
779 |
68142078 |
Creation of a new source of drinking water |
179924 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.41885
Longitude : 87.85984666666667
file name : Image_05022024113027036.png
|
2024-02-05 11:30:27.146007 |
780 |
68142078 |
Creation of a new source of drinking water |
179924 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.44504392
Longitude : 87.85836526
file name : Image_29012024131211121.png
|
2024-01-29 13:12:11.20217 |
781 |
68142078 |
Creation of a new source of drinking water |
179924 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.44502617
Longitude : 87.85837133
file name : Image_29012024130332464.png
|
2024-01-29 13:03:32.552152 |
782 |
68150028 |
Creation of drainage channel for management of grey water |
99995 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.45586933
Longitude : 87.84890777
file name : Image_19012024162652422.png
|
2024-01-19 16:26:52.520461 |
783 |
68150028 |
Creation of drainage channel for management of grey water |
99995 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.45591559
Longitude : 87.84898317
file name : Image_19012024162341081.png
|
2024-01-19 16:23:41.181537 |
784 |
68150028 |
Creation of drainage channel for management of grey water |
99995 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.455843333333338
Longitude : 87.84904833333333
file name : Image_12012024115618705.png
|
2024-01-12 11:56:18.810074 |
785 |
67524227 |
Construction of roads |
99952 |
Construction of roads1 |
Roof laid |
-
latitude : 24.4481279,24.4481279,24.4481279
Longitude : 87.8547497,87.8547497,87.8547497
file name : Image_24012024142545412.png
|
2024-01-24 14:25:45.509038 |
786 |
67524227 |
Construction of roads |
99952 |
Construction of roads1 |
Plinth level |
-
latitude : 24.4457549,24.445755,24.445755,24.445755
Longitude : 87.858249,87.8582482,87.8582482,87.8582482
file name : Image_19012024125709983.png
|
2024-01-19 12:57:10.066424 |
787 |
67524227 |
Construction of roads |
99952 |
Construction of roads1 |
Completion of work |
-
latitude : 24.445742,24.445742,24.445742
Longitude : 87.8582149,87.8582149,87.8582149
file name : Image_04012024154248358.png
|
2024-01-04 15:42:48.444104 |
788 |
67524839 |
Construction of roads |
99930 |
Construction of roads1 |
Roof laid |
-
latitude : 24.4398184,24.44094024
Longitude : 87.8640912,87.86337824
file name : Image_08012024121541240.png
|
2024-01-08 12:15:41.422332 |
789 |
67524839 |
Construction of roads |
99930 |
Construction of roads1 |
Plinth level |
-
latitude : 24.44081111,24.44082721,24.4397224
Longitude : 87.86374215,87.86378191,87.8634351
file name : Image_04012024120039289.png
|
2024-01-04 12:00:39.373303 |
790 |
67524839 |
Construction of roads |
99930 |
Construction of roads1 |
Completion of work |
-
latitude : 24.440896666666664,24.440883333333332
Longitude : 87.86340166666666,87.86344333333334
file name : Image_02012024122837821.png
|
2024-01-02 12:28:37.916643 |
791 |
67536784 |
Construction of roads |
99969 |
Construction of roads1 |
Roof laid |
-
latitude : 24.417135,24.41719833333333
Longitude : 87.85685666666669,87.85681833333335
file name : Image_19012024151557676.png
|
2024-01-19 15:15:57.768777 |
792 |
67536784 |
Construction of roads |
99969 |
Construction of roads1 |
Plinth level |
-
latitude : 24.41719428,24.41716768,24.41715609
Longitude : 87.85683584,87.85683934,87.85682205
file name : Image_10012024124825383.png
|
2024-01-10 12:48:25.485565 |
793 |
67536784 |
Construction of roads |
99969 |
Construction of roads1 |
Completion of work |
-
latitude : 24.41698163,24.41698702,24.41698544
Longitude : 87.85679951,87.85680957,87.85681212
file name : Image_09012024124657719.png
|
2024-01-09 12:46:57.799581 |
794 |
67524659 |
Construction of roads |
99955 |
Construction of roads1 |
Roof laid |
-
latitude : 24.44347833333334,24.443623333333335
Longitude : 87.86047333333333,87.860615
file name : Image_28122023133840296.png
|
2023-12-28 13:38:40.377988 |
795 |
67524659 |
Construction of roads |
99955 |
Construction of roads1 |
Plinth level |
-
latitude : 24.4402438,24.4402438,24.4402438
Longitude : 87.8564257,87.8564257,87.8564257
file name : Image_21122023140525710.png
|
2023-12-21 14:05:25.821282 |
796 |
67524659 |
Construction of roads |
99955 |
Construction of roads1 |
Completion of work |
-
latitude : 24.443181666666668,24.442236
Longitude : 87.86397666666666,87.8634152
file name : Image_19122023161332066.png
|
2023-12-19 16:13:32.166682 |
797 |
67524753 |
Construction of roads |
99955 |
Construction of roads1 |
Roof laid |
-
latitude : 24.443485000000003,24.443181666666668
Longitude : 87.86412,87.86400666666665
file name : Image_28122023134704917.png
|
2023-12-28 13:47:05.011189 |
798 |
67524753 |
Construction of roads |
99955 |
Construction of roads1 |
Plinth level |
-
latitude : 24.4402803,24.4402803,24.4402803
Longitude : 87.8563328,87.8563328,87.8563328
file name : Image_26122023132119267.png
|
2023-12-26 13:21:18.870723 |
799 |
67524753 |
Construction of roads |
99955 |
Construction of roads1 |
Completion of work |
-
latitude : 24.44364,24.44363333333333
Longitude : 87.86063666666665,87.8606
file name : Image_19122023160544522.png
|
2023-12-19 16:05:44.628161 |
800 |
67524220 |
Construction of roads |
99964 |
Construction of roads1 |
Roof laid |
-
latitude : 24.4483883,24.4483743,24.4483743
Longitude : 87.8548491,87.8548717,87.8548717
file name : Image_25012024153704540.png
|
2024-01-25 15:37:04.617752 |
801 |
67524220 |
Construction of roads |
99964 |
Construction of roads1 |
Plinth level |
-
latitude : 24.44908993,24.44908728,24.44916171
Longitude : 87.85492821,87.85494043,87.85489234
file name : Image_19012024111509889.png
|
2024-01-19 11:15:09.976118 |
802 |
67524220 |
Construction of roads |
99964 |
Construction of roads1 |
Completion of work |
-
latitude : 24.4485338,24.4483435,24.4483435
Longitude : 87.8548194,87.8548092,87.8548092
file name : Image_16012024151253683.png
|
2024-01-16 15:12:53.776373 |
803 |
68149082 |
Creation of drainage channel for management of grey water |
99971 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.45992417
Longitude : 87.85653879
file name : Image_19012024122832853.png
|
2024-01-19 12:28:32.935563 |
804 |
68149082 |
Creation of drainage channel for management of grey water |
99971 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.459830000000004
Longitude : 87.85663166666667
file name : Image_10012024161519088.png
|
2024-01-10 16:15:19.188589 |
805 |
68149082 |
Creation of drainage channel for management of grey water |
99971 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.459819999999997
Longitude : 87.85642333333332
file name : Image_02012024135535496.png
|
2024-01-02 13:55:35.62039 |
806 |
68173718 |
Creation of drainage channel for management of grey water |
99975 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.4397487
Longitude : 87.8639552
file name : Image_05032024112037976.png
|
2024-03-05 11:20:38.082517 |
807 |
68173718 |
Creation of drainage channel for management of grey water |
99975 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.4397958
Longitude : 87.8640944
file name : Image_04032024123656665.png
|
2024-03-04 12:36:56.762254 |
808 |
68173718 |
Creation of drainage channel for management of grey water |
99975 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.4397555
Longitude : 87.8640696
file name : Image_04032024123701039.png
|
2024-03-04 12:37:01.142171 |
809 |
68173718 |
Creation of drainage channel for management of grey water |
99975 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.4397219
Longitude : 87.8640822
file name : Image_28022024174939997.png
|
2024-02-28 17:49:40.085613 |
810 |
68175198 |
Creation of drainage channel for management of grey water |
99954 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.43506821
Longitude : 87.87491617
file name : Image_31012024131041871.png
|
2024-01-31 13:10:41.979025 |
811 |
68175198 |
Creation of drainage channel for management of grey water |
99954 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.43503136
Longitude : 87.87494092
file name : Image_31012024131035728.png
|
2024-01-31 13:10:35.846393 |
812 |
68175198 |
Creation of drainage channel for management of grey water |
99954 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.43502199
Longitude : 87.87492548
file name : Image_24012024122244140.png
|
2024-01-24 12:22:44.231731 |
813 |
68175198 |
Creation of drainage channel for management of grey water |
99954 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.435023
Longitude : 87.87492463
file name : Image_24012024121656737.png
|
2024-01-24 12:16:56.831111 |
814 |
67516826 |
Installation of Solar Power Installation |
150000 |
Installation of Solar Power Installation1 |
Roof laid |
-
latitude : 24.443933333333334
Longitude : 87.85335500000001
file name : Image_20122023140807103.png
|
2023-12-20 14:08:07.219808 |
815 |
67516826 |
Installation of Solar Power Installation |
150000 |
Installation of Solar Power Installation1 |
Plinth level |
-
latitude : 24.443926666666666
Longitude : 87.853365
file name : Image_20122023140611173.png
|
2023-12-20 14:06:11.402337 |
816 |
67516826 |
Installation of Solar Power Installation |
150000 |
Installation of Solar Power Installation1 |
Completion of work |
-
latitude : 24.45389
Longitude : 87.84856166666665
file name : Image_20122023140340747.png
|
2023-12-20 14:03:40.847843 |
817 |
68098537 |
Services of Collection & transportation of waste from household to treatment site |
120000 |
Services of Collection & transportation of waste from household to treatment site1 |
Roof laid |
-
latitude : 24.4423861
Longitude : 87.8494414
file name : Image_28122023123749574.png
|
2023-12-28 12:37:49.659614 |
818 |
68098537 |
Services of Collection & transportation of waste from household to treatment site |
120000 |
Services of Collection & transportation of waste from household to treatment site1 |
Plinth level |
-
latitude : 24.4424965
Longitude : 87.8494627
file name : Image_28122023123054622.png
|
2023-12-28 12:30:54.721688 |
819 |
68098537 |
Services of Collection & transportation of waste from household to treatment site |
120000 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 24.4424282
Longitude : 87.8494308
file name : Image_28122023122323019.png
|
2023-12-28 12:23:23.116756 |
820 |
67524339 |
Construction of roads |
99964 |
Construction of roads1 |
Plinth level |
-
latitude : 24.44346666666667,24.443501666666666,24.443361666666668
Longitude : 87.85009833333334,87.85015666666668,87.85027666666669
file name : Image_22042024160837713.png
|
2024-04-22 16:08:37.816812 |
821 |
67524339 |
Construction of roads |
99964 |
Construction of roads1 |
Plinth level |
-
latitude : 24.443320000000003,24.443339999999996
Longitude : 87.84991,87.85005500000001
file name : Image_22042024160230305.png
|
2024-04-22 16:02:30.410445 |
822 |
67524339 |
Construction of roads |
99964 |
Construction of roads1 |
Completion of work |
-
latitude : 24.443315,24.443271666666668
Longitude : 87.85007499999999,87.85014000000001
file name : Image_19042024170302370.png
|
2024-04-19 17:03:02.58604 |
823 |
67539655 |
Construction of roads |
199870 |
Construction of roads1 |
Roof laid |
-
latitude : 24.4227134,24.42271199,24.42271664
Longitude : 87.86643796,87.86644179,87.86644755
file name : Image_26122023135538377.png
|
2023-12-26 13:55:38.479182 |
824 |
67539655 |
Construction of roads |
199870 |
Construction of roads1 |
Plinth level |
-
latitude : 24.42276242,24.42275158,24.42272425
Longitude : 87.86644918,87.8664519,87.86648035
file name : Image_26122023134809036.png
|
2023-12-26 13:48:09.110951 |
825 |
67539655 |
Construction of roads |
199870 |
Construction of roads1 |
Completion of work |
-
latitude : 24.42269942,24.42272197,24.42273276
Longitude : 87.866412,87.86640648,87.8664201
file name : Image_18122023124434477.png
|
2023-12-18 12:44:34.591529 |
826 |
68100593 |
Operation and Maintenance of drinking water supply system |
350000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 24.4402009
Longitude : 87.8563335
file name : Image_03062024125928442.png
|
2024-06-03 12:59:28.546259 |
827 |
68100593 |
Operation and Maintenance of drinking water supply system |
350000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 24.4401634
Longitude : 87.8563225
file name : Image_03062024125000752.png
|
2024-06-03 12:50:00.831956 |
828 |
68100593 |
Operation and Maintenance of drinking water supply system |
350000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.4401574
Longitude : 87.8563288
file name : Image_03062024124438292.png
|
2024-06-03 12:44:38.365527 |
829 |
67539437 |
Construction of roads |
99969 |
Construction of roads1 |
Roof laid |
-
latitude : 24.42585647,24.42581279,24.42580554
Longitude : 87.86122332,87.86138041,87.86139418
file name : Image_24012024133221701.png
|
2024-01-24 13:32:21.789777 |
830 |
67539437 |
Construction of roads |
99969 |
Construction of roads1 |
Plinth level |
-
latitude : 24.42587,24.425863333333336
Longitude : 87.86127499999999,87.86126166666666
file name : Image_18012024122402867.png
|
2024-01-18 12:24:02.973399 |
831 |
67539437 |
Construction of roads |
99969 |
Construction of roads1 |
Completion of work |
-
latitude : 24.42581613,24.42579167,24.42579035
Longitude : 87.8610663,87.86109,87.86106113
file name : Image_18122023135004291.png
|
2023-12-18 13:50:05.201576 |
832 |
68176132 |
Creation of drainage channel for management of grey water |
99932 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.419983333333334
Longitude : 87.85840666666667
file name : Image_04012024112353347.png
|
2024-01-04 11:23:53.432038 |
833 |
68176132 |
Creation of drainage channel for management of grey water |
99932 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.42016981
Longitude : 87.8580856
file name : Image_29122023125225900.png
|
2023-12-29 12:52:25.993542 |
834 |
68176132 |
Creation of drainage channel for management of grey water |
99932 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.42008541
Longitude : 87.85798372
file name : Image_29122023124621975.png
|
2023-12-29 12:46:22.071275 |
835 |
68142391 |
Creation of a new source of drinking water |
99969 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.4394591
Longitude : 87.8548846
file name : Image_19012024150317459.png
|
2024-01-19 15:03:17.551363 |
836 |
68142391 |
Creation of a new source of drinking water |
99969 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.4393681
Longitude : 87.8547087
file name : Image_18012024114627967.png
|
2024-01-18 11:46:28.063318 |
837 |
68142391 |
Creation of a new source of drinking water |
99969 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.4393129
Longitude : 87.8546923
file name : Image_17012024134341193.png
|
2024-01-17 13:43:41.273551 |
838 |
98841098 |
Water Supply to villages |
1200000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 24.4402415
Longitude : 87.8563346
file name : Image_23092024153014515.png
|
2024-09-23 15:30:14.603871 |
839 |
98841098 |
Water Supply to villages |
1200000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.4401513
Longitude : 87.856345
file name : Image_23092024152733628.png
|
2024-09-23 15:27:33.72083 |
840 |
98841098 |
Water Supply to villages |
1200000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.44079
Longitude : 87.85736
file name : Image_23092024152512205.png
|
2024-09-23 15:25:12.301128 |
841 |
68100195 |
Operation and Maintenance of drinking water supply system |
350000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 24.4376787
Longitude : 87.8560497
file name : Image_08012024123847163.png
|
2024-01-08 12:38:47.239631 |
842 |
68100195 |
Operation and Maintenance of drinking water supply system |
350000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 24.4401739
Longitude : 87.8563304
file name : Image_08012024123336405.png
|
2024-01-08 12:33:36.498626 |
843 |
68100195 |
Operation and Maintenance of drinking water supply system |
350000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 24.4401672
Longitude : 87.8563212
file name : Image_05012024165656443.png
|
2024-01-05 16:56:56.515359 |
844 |
68100195 |
Operation and Maintenance of drinking water supply system |
350000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.4401693
Longitude : 87.8563135
file name : Image_05012024164954807.png
|
2024-01-05 16:49:54.87919 |
845 |
68099508 |
Services of Collection & transportation of waste from household to treatment site |
130580 |
Services of Collection & transportation of waste from household to treatment site1 |
Roof laid |
-
latitude : 24.4402509
Longitude : 87.8563513
file name : Image_25052024105842712.png
|
2024-05-25 10:58:42.799197 |
846 |
68099508 |
Services of Collection & transportation of waste from household to treatment site |
130580 |
Services of Collection & transportation of waste from household to treatment site1 |
Plinth level |
-
latitude : 24.4402823
Longitude : 87.8563315
file name : Image_25052024105616685.png
|
2024-05-25 10:56:16.789814 |
847 |
68099508 |
Services of Collection & transportation of waste from household to treatment site |
130580 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 24.4402573
Longitude : 87.8563435
file name : Image_25052024104427674.png
|
2024-05-25 10:44:27.754565 |
848 |
68174499 |
Creation of drainage channel for management of grey water |
99975 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.4392238
Longitude : 87.864239
file name : Image_08022024161259941.png
|
2024-02-08 16:13:00.0288 |
849 |
68174499 |
Creation of drainage channel for management of grey water |
99975 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.4392971
Longitude : 87.8642443
file name : Image_08022024160604275.png
|
2024-02-08 16:06:04.382253 |
850 |
68174499 |
Creation of drainage channel for management of grey water |
99975 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.4391572
Longitude : 87.8642303
file name : Image_08022024155547592.png
|
2024-02-08 15:55:47.692182 |
851 |
68174499 |
Creation of drainage channel for management of grey water |
99975 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.439333
Longitude : 87.8642422
file name : Image_24012024104733823.png
|
2024-01-24 10:47:33.910035 |
852 |
98758011 |
Services of Collection & transportation of waste from household to treatment site |
150000 |
Services of Collection & transportation of waste from household to treatment site1 |
Roof laid |
-
latitude : 24.442639999999997
Longitude : 87.84885166666666
file name : Image_03102024131721832.png
|
2024-10-03 13:17:21.903142 |
853 |
98758011 |
Services of Collection & transportation of waste from household to treatment site |
150000 |
Services of Collection & transportation of waste from household to treatment site1 |
Plinth level |
-
latitude : 24.4426733
Longitude : 87.8487936
file name : Image_03102024131400665.png
|
2024-10-03 13:14:00.847153 |
854 |
98758011 |
Services of Collection & transportation of waste from household to treatment site |
150000 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 24.4426731
Longitude : 87.8488017
file name : Image_03102024130958349.png
|
2024-10-03 13:09:58.441051 |
855 |
98759014 |
Services of Collection & transportation of waste from household to treatment site |
150000 |
Services of Collection & transportation of waste from household to treatment site1 |
Roof laid |
-
latitude : 24.440994999999997
Longitude : 87.85607999999999
file name : Image_01102024135537058.png
|
2024-10-01 13:55:37.146164 |
856 |
98759014 |
Services of Collection & transportation of waste from household to treatment site |
150000 |
Services of Collection & transportation of waste from household to treatment site1 |
Plinth level |
-
latitude : 24.4406691
Longitude : 87.8565666
file name : Image_01102024134528137.png
|
2024-10-01 13:45:28.227109 |
857 |
98759014 |
Services of Collection & transportation of waste from household to treatment site |
150000 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 24.44083
Longitude : 87.85649
file name : Image_01102024134233199.png
|
2024-10-01 13:42:33.291129 |
858 |
98671083 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
100000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
|
-
latitude : 24.440875
Longitude : 87.86380333333334
file name : Image_01102024132628073.png
|
2024-10-01 13:26:28.17274 |
859 |
98841689 |
Water Supply to villages |
670000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 24.4402321
Longitude : 87.856388
file name : Image_03102024135213418.png
|
2024-10-03 13:52:13.603085 |
860 |
98841689 |
Water Supply to villages |
670000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.44034166666667
Longitude : 87.85625166666665
file name : Image_03102024135014770.png
|
2024-10-03 13:50:15.422387 |
861 |
98841689 |
Water Supply to villages |
670000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.4402524
Longitude : 87.8563393
file name : Image_03102024134446186.png
|
2024-10-03 13:44:46.27602 |
862 |
98674563 |
Construction of roads |
99928 |
Construction of roads1 |
Completion of work |
-
latitude : 24.459978333333332,24.459926666666668
Longitude : 87.85706666666668,87.85722833333332
file name : Image_22102024115357252.png
|
2024-10-22 11:53:57.356799 |
863 |
98725973 |
Construction of roads |
69971 |
Construction of roads1 |
Completion of work |
-
latitude : 24.442741666666667,24.44279333333333
Longitude : 87.85704333333334,87.85694333333335
file name : Image_23102024113812514.png
|
2024-10-23 11:38:12.62552 |
864 |
98726298 |
Construction of roads |
69971 |
Construction of roads1 |
Completion of work |
-
latitude : 24.442798333333332,24.44279333333333
Longitude : 87.85710499999999,87.85709166666666
file name : Image_23102024113647937.png
|
2024-10-23 11:36:48.038884 |
865 |
56903642 |
CONS OF ROAD PROTECTION WALL BY BOUDER MASONRY AT DANAR PUKUR AT GHUSKIRA |
149462 |
CONS OF ROAD PROTECTION WALL BY BOUDER MASONRY AT DANAR PUKUR AT GHUSKIRA1 |
Roof laid |
-
latitude : 24.4402201
Longitude : 87.8565954
file name : Image_24072024122743205.png
|
2024-07-24 12:27:43.295671 |
866 |
56903642 |
CONS OF ROAD PROTECTION WALL BY BOUDER MASONRY AT DANAR PUKUR AT GHUSKIRA |
149462 |
CONS OF ROAD PROTECTION WALL BY BOUDER MASONRY AT DANAR PUKUR AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.4402201
Longitude : 87.8565954
file name : Image_24072024122448584.png
|
2024-07-24 12:24:48.697351 |
867 |
56903642 |
CONS OF ROAD PROTECTION WALL BY BOUDER MASONRY AT DANAR PUKUR AT GHUSKIRA |
149462 |
CONS OF ROAD PROTECTION WALL BY BOUDER MASONRY AT DANAR PUKUR AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.4402201
Longitude : 87.8565954
file name : Image_24072024121318038.png
|
2024-07-24 12:13:18.126516 |
868 |
96729288 |
Creation of a new source of drinking water |
99969 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.4409488
Longitude : 87.853169
file name : Image_11082024111619488.png
|
2024-08-11 11:16:19.562262 |
869 |
96729288 |
Creation of a new source of drinking water |
99969 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.4409485
Longitude : 87.8531758
file name : Image_10082024144941920.png
|
2024-08-10 14:49:42.012081 |
870 |
96729288 |
Creation of a new source of drinking water |
99969 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.440579
Longitude : 87.8571849
file name : Image_27072024112555843.png
|
2024-07-27 11:25:55.933785 |
871 |
68169705 |
Creation of drainage channel for management of grey water |
99994 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.4402539
Longitude : 87.8563268
file name : Image_20092024132520852.png
|
2024-09-20 13:25:20.930956 |
872 |
68169705 |
Creation of drainage channel for management of grey water |
99994 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.4402539
Longitude : 87.8563268
file name : Image_20092024132111777.png
|
2024-09-20 13:21:11.85183 |
873 |
68169803 |
Creation of drainage channel for management of grey water |
69723 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.440227
Longitude : 87.856335
file name : Image_09092024120633735.png
|
2024-09-09 12:08:16.212861 |
874 |
68169803 |
Creation of drainage channel for management of grey water |
69723 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.4401756
Longitude : 87.8563222
file name : Image_05092024160031335.png
|
2024-09-05 16:01:00.1701 |
875 |
68169803 |
Creation of drainage channel for management of grey water |
69723 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.4401756
Longitude : 87.8563222
file name : Image_05092024154849694.png
|
2024-09-05 15:49:18.375153 |
876 |
68170141 |
Creation of drainage channel for management of grey water |
179954 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.444357
Longitude : 87.8539215
file name : Image_23082024114032043.png
|
2024-08-23 11:40:32.134831 |
877 |
68170141 |
Creation of drainage channel for management of grey water |
179954 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.4443544
Longitude : 87.8537874
file name : Image_22082024144716736.png
|
2024-08-22 14:47:16.923523 |
878 |
68170141 |
Creation of drainage channel for management of grey water |
179954 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.444327
Longitude : 87.8539796
file name : Image_08082024120948708.png
|
2024-08-08 12:09:48.830517 |
879 |
68171990 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.4401834
Longitude : 87.8563347
file name : Image_02092024133626736.png
|
2024-09-02 13:36:27.289985 |
880 |
68171990 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.4401834
Longitude : 87.8563347
file name : Image_02092024133252942.png
|
2024-09-02 13:32:53.461733 |
881 |
68171990 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.4401834
Longitude : 87.8563347
file name : Image_02092024132821468.png
|
2024-09-02 13:28:21.943438 |
882 |
68177447 |
Creation of drainage channel for management of grey water |
199905 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.422908333333332
Longitude : 87.86459500000001
file name : Image_21082024112625818.png
|
2024-08-21 11:26:25.905246 |
883 |
68177447 |
Creation of drainage channel for management of grey water |
199905 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.422883333333335
Longitude : 87.86461333333334
file name : Image_20082024110407126.png
|
2024-08-20 11:04:07.211839 |
884 |
68177447 |
Creation of drainage channel for management of grey water |
199905 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.4171752
Longitude : 87.859182
file name : Image_14082024092624655.png
|
2024-08-14 09:26:24.751131 |
885 |
68142863 |
Creation of a new source of drinking water |
149950 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.4402524
Longitude : 87.8563338
file name : Image_24092024134812676.png
|
2024-09-24 13:48:12.814733 |
886 |
68177069 |
Creation of drainage channel for management of grey water |
199905 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.419718
Longitude : 87.8583594
file name : Image_29072024174700440.png
|
2024-07-29 17:47:00.56195 |
887 |
68177069 |
Creation of drainage channel for management of grey water |
199905 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.419718
Longitude : 87.8583594
file name : Image_29072024174241301.png
|
2024-07-29 17:42:41.400437 |
888 |
68177069 |
Creation of drainage channel for management of grey water |
199905 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.416878333333337
Longitude : 87.85843333333332
file name : Image_25072024121248931.png
|
2024-07-25 12:12:49.048024 |
889 |
96654571 |
Creation of drainage channel for management of grey water |
179978 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.4402484
Longitude : 87.8563258
file name : Image_06082024120310702.png
|
2024-08-06 12:03:10.796445 |
890 |
96654571 |
Creation of drainage channel for management of grey water |
179978 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.4401503
Longitude : 87.8563233
file name : Image_30072024171113284.png
|
2024-07-30 17:11:13.399646 |
891 |
96654571 |
Creation of drainage channel for management of grey water |
179978 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.4529568
Longitude : 87.8494568
file name : Image_29072024172510239.png
|
2024-07-29 17:25:10.327342 |
892 |
96654571 |
Creation of drainage channel for management of grey water |
179978 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.4529568
Longitude : 87.8494568
file name : Image_29072024172501543.png
|
2024-07-29 17:25:01.672516 |
893 |
68143413 |
Creation of a new source of drinking water |
249900 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.4402524
Longitude : 87.8563338
file name : Image_24092024133719007.png
|
2024-09-24 13:37:19.109305 |
894 |
68143722 |
Creation of a new source of drinking water |
149988 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.438908333333334
Longitude : 87.86931333333332
file name : Image_29072024160015181.png
|
2024-07-29 16:00:15.324591 |
895 |
68143722 |
Creation of a new source of drinking water |
149988 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.438866666666666
Longitude : 87.86930833333332
file name : Image_29072024155759866.png
|
2024-07-29 15:57:59.975687 |
896 |
68143722 |
Creation of a new source of drinking water |
149988 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.4316276
Longitude : 87.8613656
file name : Image_27072024105556092.png
|
2024-07-27 10:55:56.203562 |
897 |
68144247 |
Creation of a new source of drinking water |
149950 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.4393835
Longitude : 87.8592521
file name : Image_02092024150423704.png
|
2024-09-02 15:04:23.848661 |
898 |
68144247 |
Creation of a new source of drinking water |
149950 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.4393835
Longitude : 87.8592521
file name : Image_02092024150020879.png
|
2024-09-02 15:00:21.761019 |
899 |
68144247 |
Creation of a new source of drinking water |
149950 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.43335666666667
Longitude : 87.86846500000001
file name : Image_26072024110736679.png
|
2024-07-26 11:07:36.774211 |
900 |
96655857 |
Creation of a new source of drinking water |
249900 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.436515
Longitude : 87.84606666666666
file name : Image_13082024113407405.png
|
2024-08-13 11:34:07.504229 |
901 |
96655857 |
Creation of a new source of drinking water |
249900 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.436515
Longitude : 87.84606666666666
file name : Image_13082024113402426.png
|
2024-08-13 11:34:02.531081 |
902 |
96655857 |
Creation of a new source of drinking water |
249900 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.436490000000003
Longitude : 87.84608333333333
file name : Image_13082024113358277.png
|
2024-08-13 11:33:58.396704 |
903 |
96726989 |
Creation of a new source of drinking water |
99969 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.44080333333333
Longitude : 87.86482166666669
file name : Image_30072024121841973.png
|
2024-07-30 12:18:42.062319 |
904 |
96726989 |
Creation of a new source of drinking water |
99969 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.4394086
Longitude : 87.8618161
file name : Image_29072024131755156.png
|
2024-07-29 13:17:55.243635 |
905 |
96726989 |
Creation of a new source of drinking water |
99969 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.4394086
Longitude : 87.8618161
file name : Image_29072024131119761.png
|
2024-07-29 13:11:19.858584 |
906 |
67517859 |
Construction of roads |
199977 |
Construction of roads1 |
Roof laid |
-
latitude : 24.458756666666666,24.45877666666667
Longitude : 87.84586666666668,87.84586333333333
file name : Image_29072024125255185.png
|
2024-07-29 12:52:55.275106 |
907 |
67517859 |
Construction of roads |
199977 |
Construction of roads1 |
Plinth level |
-
latitude : 24.458736666666663,24.458765000000003
Longitude : 87.84585999999999,87.84586499999999
file name : Image_29072024124845578.png
|
2024-07-29 12:48:45.67135 |
908 |
67517859 |
Construction of roads |
199977 |
Construction of roads1 |
Completion of work |
-
latitude : 24.458739999999995,24.458738333333333
Longitude : 87.84583666666667,87.84585
file name : Image_29072024124506452.png
|
2024-07-29 12:45:06.533728 |
909 |
67520051 |
Construction of roads |
149888 |
Construction of roads1 |
Roof laid |
-
latitude : 24.4401503,24.4401503
Longitude : 87.8563233,87.8563233
file name : Image_30072024165307348.png
|
2024-07-30 16:53:07.479602 |
910 |
67520051 |
Construction of roads |
149888 |
Construction of roads1 |
Plinth level |
-
latitude : 24.4529568,24.4529568
Longitude : 87.8494568,87.8494568
file name : Image_29072024162947499.png
|
2024-07-29 16:29:47.587748 |
911 |
67520051 |
Construction of roads |
149888 |
Construction of roads1 |
Completion of work |
-
latitude : 24.4529568,24.4529568
Longitude : 87.8494568,87.8494568
file name : Image_29072024161824064.png
|
2024-07-29 16:18:24.145302 |
912 |
68171080 |
Creation of drainage channel for management of grey water |
89914 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.4386057
Longitude : 87.8543511
file name : Image_11082024172224130.png
|
2024-08-11 17:22:24.222244 |
913 |
68171080 |
Creation of drainage channel for management of grey water |
89914 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.4385992
Longitude : 87.8543505
file name : Image_11082024171303249.png
|
2024-08-11 17:13:03.353016 |
914 |
68171080 |
Creation of drainage channel for management of grey water |
89914 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.438305
Longitude : 87.85447500000001
file name : Image_11082024171309493.png
|
2024-08-11 17:13:09.617448 |
915 |
68171080 |
Creation of drainage channel for management of grey water |
89914 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.438246666666668
Longitude : 87.854445
file name : Image_25072024114244802.png
|
2024-07-25 11:42:44.898973 |
916 |
67524448 |
Construction of roads |
144084 |
Construction of roads1 |
Roof laid |
-
latitude : 24.4434448,24.443365000000004
Longitude : 87.8556789,87.85570000000001
file name : Image_21082024150519457.png
|
2024-08-21 15:05:19.614131 |
917 |
67524448 |
Construction of roads |
144084 |
Construction of roads1 |
Plinth level |
-
latitude : 24.443328333333337,24.443324999999998
Longitude : 87.855675,87.85566666666666
file name : Image_21082024150045509.png
|
2024-08-21 15:00:45.622209 |
918 |
67524448 |
Construction of roads |
144084 |
Construction of roads1 |
Completion of work |
-
latitude : 24.443495,24.4434095
Longitude : 87.85575333333333,87.8556953
file name : Image_20082024135101224.png
|
2024-08-20 13:51:01.307569 |
919 |
67524202 |
Construction of roads |
69890 |
Construction of roads1 |
Roof laid |
-
latitude : 24.4417912,24.4417912
Longitude : 87.8509611,87.8509611
file name : Image_09082024115959750.png
|
2024-08-09 11:59:59.8659 |
920 |
67524202 |
Construction of roads |
69890 |
Construction of roads1 |
Plinth level |
-
latitude : 24.435488333333335,24.435470000000002
Longitude : 87.84449000000001,87.84448499999999
file name : Image_08082024140005292.png
|
2024-08-08 14:00:05.388592 |
921 |
67524202 |
Construction of roads |
69890 |
Construction of roads1 |
Completion of work |
-
latitude : 24.435461666666665,24.435459999999996
Longitude : 87.84448833333333,87.84448499999999
file name : Image_06082024140157212.png
|
2024-08-06 14:01:57.347808 |
922 |
67525032 |
Construction of roads |
149917 |
Construction of roads1 |
Roof laid |
-
latitude : 24.4393015,24.4393015
Longitude : 87.8589242,87.8589242
file name : Image_03092024153540462.png
|
2024-09-03 15:35:40.583506 |
923 |
67525032 |
Construction of roads |
149917 |
Construction of roads1 |
Plinth level |
-
latitude : 24.4393015,24.4393015
Longitude : 87.8589242,87.8589242
file name : Image_03092024152734043.png
|
2024-09-03 15:27:34.143323 |
924 |
67525032 |
Construction of roads |
149917 |
Construction of roads1 |
Completion of work |
-
latitude : 24.4393015,24.4393015
Longitude : 87.8589242,87.8589242
file name : Image_03092024151343145.png
|
2024-09-03 15:13:43.23619 |
925 |
67539895 |
Construction of roads |
149940 |
Construction of roads1 |
Roof laid |
-
latitude : 24.412175,24.412103333333334
Longitude : 87.86035500000001,87.86031666666668
file name : Image_07082024113334652.png
|
2024-08-07 11:33:33.873832 |
926 |
67539895 |
Construction of roads |
149940 |
Construction of roads1 |
Plinth level |
-
latitude : 24.417173,24.417173
Longitude : 87.8591847,87.8591847
file name : Image_06082024100619726.png
|
2024-08-06 10:06:19.845055 |
927 |
67539895 |
Construction of roads |
149940 |
Construction of roads1 |
Completion of work |
-
latitude : 24.41214166666667,24.412269999999996
Longitude : 87.86033166666667,87.86039833333334
file name : Image_31072024100748924.png
|
2024-07-31 10:07:49.012308 |
928 |
68173337 |
Creation of drainage channel for management of grey water |
99994 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.44197166666667
Longitude : 87.86192833333334
file name : Image_28082024122003265.png
|
2024-08-28 12:20:03.642191 |
929 |
68173337 |
Creation of drainage channel for management of grey water |
99994 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.441648333333333
Longitude : 87.86290833333332
file name : Image_02092024161238183.png
|
2024-09-02 16:12:38.427553 |
930 |
68173337 |
Creation of drainage channel for management of grey water |
99994 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.441648333333333
Longitude : 87.86290833333332
file name : Image_02092024161222273.png
|
2024-09-02 16:12:22.50736 |
931 |
68173337 |
Creation of drainage channel for management of grey water |
99994 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.441645
Longitude : 87.86288833333334
file name : Image_02092024161218130.png
|
2024-09-02 16:12:18.381263 |
932 |
68173337 |
Creation of drainage channel for management of grey water |
99994 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.439265
Longitude : 87.8588768
file name : Image_21082024124245389.png
|
2024-08-21 12:42:45.480414 |
933 |
68173337 |
Creation of drainage channel for management of grey water |
99994 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.439265
Longitude : 87.8588768
file name : Image_21082024123158842.png
|
2024-08-21 12:31:58.934245 |
934 |
68172629 |
Creation of drainage channel for management of grey water |
99741 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.44187
Longitude : 87.85824333333333
file name : Image_06082024124631186.png
|
2024-08-06 12:46:31.290834 |
935 |
68172629 |
Creation of drainage channel for management of grey water |
99741 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.441921666666666
Longitude : 87.858235
file name : Image_06082024124318908.png
|
2024-08-06 12:43:19.008413 |
936 |
68172629 |
Creation of drainage channel for management of grey water |
99741 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.4418761
Longitude : 87.8577829
file name : Image_06082024123236745.png
|
2024-08-06 12:32:36.84858 |
937 |
68174861 |
Creation of drainage channel for management of grey water |
99741 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.4387618
Longitude : 87.85931
file name : Image_16082024165040902.png
|
2024-08-16 16:50:40.988174 |
938 |
68174861 |
Creation of drainage channel for management of grey water |
99741 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.43869833333333
Longitude : 87.85934
file name : Image_06082024125341607.png
|
2024-08-06 12:53:41.713936 |
939 |
68174861 |
Creation of drainage channel for management of grey water |
99741 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.4426006
Longitude : 87.8575076
file name : Image_30072024171117653.png
|
2024-07-30 17:11:17.771483 |
940 |
68173839 |
Creation of drainage channel for management of grey water |
99994 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.441588333333335
Longitude : 87.86287166666668
file name : Image_09092024104152471.png
|
2024-09-09 10:41:52.558994 |
941 |
68173839 |
Creation of drainage channel for management of grey water |
99994 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.44170166666667
Longitude : 87.86290166666667
file name : Image_28082024122338879.png
|
2024-08-28 12:23:39.29001 |
942 |
68173839 |
Creation of drainage channel for management of grey water |
99994 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.439265
Longitude : 87.8588768
file name : Image_21082024123520551.png
|
2024-08-21 12:35:20.657172 |
943 |
67524706 |
Construction of roads |
99952 |
Construction of roads1 |
Roof laid |
-
latitude : 24.439289999999996,24.439328333333332
Longitude : 87.86877666666666,87.86880500000001
file name : Image_29072024185318261.png
|
2024-07-29 18:53:18.36674 |
944 |
67524706 |
Construction of roads |
99952 |
Construction of roads1 |
Plinth level |
-
latitude : 24.43924,24.439255000000003
Longitude : 87.868775,87.86874833333334
file name : Image_29072024185040212.png
|
2024-07-29 18:50:40.293556 |
945 |
67524706 |
Construction of roads |
99952 |
Construction of roads1 |
Completion of work |
-
latitude : 24.439270000000004,24.439510000000002
Longitude : 87.86876333333333,87.86881333333334
file name : Image_26072024115400131.png
|
2024-07-26 11:54:00.257583 |
946 |
67536566 |
Construction of roads |
99931 |
Construction of roads1 |
Roof laid |
-
latitude : 24.419718,24.419718
Longitude : 87.8583594,87.8583594
file name : Image_29072024173307045.png
|
2024-07-29 17:33:07.160581 |
947 |
67536566 |
Construction of roads |
99931 |
Construction of roads1 |
Plinth level |
-
latitude : 24.419718,24.419718
Longitude : 87.8583594,87.8583594
file name : Image_29072024172751654.png
|
2024-07-29 17:27:51.732641 |
948 |
67536566 |
Construction of roads |
99931 |
Construction of roads1 |
Completion of work |
-
latitude : 24.419849999999997,24.41981333333333
Longitude : 87.85868166666666,87.85876000000002
file name : Image_25072024123513866.png
|
2024-07-25 12:35:13.951395 |
949 |
67524241 |
Construction of roads |
149904 |
Construction of roads1 |
Plinth level |
-
latitude : 24.447163333333332,24.447175
Longitude : 87.85254166666667,87.85193
file name : Image_29092024113326481.png
|
2024-09-29 11:33:26.590855 |
950 |
67524241 |
Construction of roads |
149904 |
Construction of roads1 |
Completion of work |
-
latitude : 24.4452152,24.4452138
Longitude : 87.8530612,87.853066
file name : Image_13082024170401047.png
|
2024-08-13 17:04:01.200463 |
951 |
67539803 |
Construction of roads |
139862 |
Construction of roads1 |
Roof laid |
-
latitude : 24.40942326,24.4094665,24.40946188
Longitude : 87.86293403,87.86291221,87.86291393
file name : Image_24012024131607062.png
|
2024-01-24 13:16:07.153396 |
952 |
67539803 |
Construction of roads |
139862 |
Construction of roads1 |
Plinth level |
-
latitude : 24.409203333333334,24.40926833333333
Longitude : 87.86289000000001,87.86288
file name : Image_22012024124417832.png
|
2024-01-22 12:44:17.916363 |
953 |
67539803 |
Construction of roads |
139862 |
Construction of roads1 |
Completion of work |
-
latitude : 24.40913833333333,24.409411666666664
Longitude : 87.86282333333332,87.86291333333332
file name : Image_21012024110044171.png
|
2024-01-21 11:00:44.267449 |
954 |
96736895 |
Construction of roads |
99952 |
Construction of roads1 |
Roof laid |
-
latitude : 24.4394086,24.4394086
Longitude : 87.8618161,87.8618161
file name : Image_29072024133151861.png
|
2024-07-29 13:31:51.967264 |
955 |
96736895 |
Construction of roads |
99952 |
Construction of roads1 |
Plinth level |
-
latitude : 24.4394086,24.4394086
Longitude : 87.8618161,87.8618161
file name : Image_29072024132922310.png
|
2024-07-29 13:29:22.399718 |
956 |
96736895 |
Construction of roads |
99952 |
Construction of roads1 |
Completion of work |
-
latitude : 24.439467,24.439467
Longitude : 87.8655622,87.8655622
file name : Image_25072024160409620.png
|
2024-07-25 16:04:09.737501 |
957 |
96736895 |
Construction of roads |
99952 |
Construction of roads1 |
Completion of work |
-
latitude : 24.439467,24.439467
Longitude : 87.8655622,87.8655622
file name : Image_25072024160413026.png
|
2024-07-25 16:04:13.111748 |
958 |
98747812 |
Construction of roads |
99952 |
Construction of roads1 |
Completion of work |
-
latitude : 24.441036666666665,24.441048333333335
Longitude : 87.86384833333335,87.86385333333334
file name : Image_22102024124744592.png
|
2024-10-22 12:47:44.69775 |
959 |
98747074 |
Construction of roads |
99952 |
Construction of roads1 |
Completion of work |
-
latitude : 24.440098333333335,24.4398024
Longitude : 87.86412,87.8640891
file name : Image_22102024130034772.png
|
2024-10-22 13:00:35.107715 |
960 |
67524211 |
Construction of roads |
99980 |
Construction of roads1 |
Roof laid |
-
latitude : 24.44948594,24.44948571,24.44948705
Longitude : 87.85161388,87.85161287,87.85160988
file name : Image_08012024154827104.png
|
2024-01-08 15:48:27.234656 |
961 |
67524211 |
Construction of roads |
99980 |
Construction of roads1 |
Plinth level |
-
latitude : 24.44945742,24.44935688,24.44945213
Longitude : 87.85166435,87.85168731,87.85168756
file name : Image_08012024154533170.png
|
2024-01-08 15:45:33.293159 |
962 |
67524211 |
Construction of roads |
99980 |
Construction of roads1 |
Completion of work |
-
latitude : 24.4551217,24.44950735,24.44952463
Longitude : 87.8560497,87.85181327,87.85180886
file name : Image_04012024153258018.png
|
2024-01-04 15:32:58.110038 |
963 |
98674981 |
Construction of roads |
99928 |
Construction of roads1 |
Completion of work |
-
latitude : 24.4571779,24.4571777
Longitude : 87.8576467,87.8576509
file name : Image_22102024115005459.png
|
2024-10-22 11:50:05.608227 |
964 |
98690247 |
Construction of roads |
99928 |
Construction of roads1 |
Completion of work |
-
latitude : 24.4401818,24.4401818
Longitude : 87.8563306,87.8563306
file name : Image_23102024122315264.png
|
2024-10-23 12:23:15.363784 |
965 |
98690247 |
Construction of roads |
99928 |
Construction of roads1 |
Completion of work |
-
latitude : 24.4401818,24.4401818
Longitude : 87.8563306,87.8563306
file name : Image_23102024121727605.png
|
2024-10-23 12:17:27.75057 |
966 |
98688605 |
Construction of roads |
99928 |
Construction of roads1 |
Completion of work |
-
latitude : 24.4401818,24.4401818
Longitude : 87.8563306,87.8563306
file name : Image_23102024122147397.png
|
2024-10-23 12:21:47.501017 |
967 |
98708188 |
Construction of roads |
99952 |
Construction of roads1 |
Completion of work |
-
latitude : 24.444008333333333,24.44408
Longitude : 87.85780166666667,87.85760499999999
file name : Image_23102024114204550.png
|
2024-10-23 11:42:04.646302 |
968 |
67519645 |
Construction of roads |
99928 |
Construction of roads1 |
Completion of work |
-
latitude : 24.45741333333334,24.457386666666668
Longitude : 87.86385833333334,87.86387500000001
file name : Image_22102024121207493.png
|
2024-10-22 12:12:07.586598 |
969 |
98746240 |
Construction of roads |
99952 |
Construction of roads1 |
Completion of work |
-
latitude : 24.4394833,24.435971666666667
Longitude : 87.8586227,87.86033333333334
file name : Image_22102024131017720.png
|
2024-10-22 13:10:18.564533 |
970 |
68173195 |
Creation of drainage channel for management of grey water |
99975 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.4406608
Longitude : 87.8565709
file name : Image_05032024113936674.png
|
2024-03-05 11:39:36.764799 |
971 |
68173195 |
Creation of drainage channel for management of grey water |
99975 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.4406516
Longitude : 87.8565576
file name : Image_09022024144259926.png
|
2024-02-09 14:43:00.023444 |
972 |
68173195 |
Creation of drainage channel for management of grey water |
99975 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.440361666666664
Longitude : 87.85665333333333
file name : Image_31012024115739254.png
|
2024-01-31 11:57:39.37207 |
973 |
67525162 |
Construction of roads |
99955 |
Construction of roads1 |
Roof laid |
-
latitude : 24.434185000000003,24.434173333333334
Longitude : 87.867555,87.86757666666666
file name : Image_04032024122440183.png
|
2024-03-04 12:24:40.27152 |
974 |
67525162 |
Construction of roads |
99955 |
Construction of roads1 |
Plinth level |
-
latitude : 24.434483333333333,24.43447666666667
Longitude : 87.86765500000001,87.86769333333335
file name : Image_19022024130228198.png
|
2024-02-19 13:02:28.280776 |
975 |
67525162 |
Construction of roads |
99955 |
Construction of roads1 |
Completion of work |
-
latitude : 24.434203333333336,24.434218333333334
Longitude : 87.86757333333335,87.86754833333335
file name : Image_16012024112317185.png
|
2024-01-16 11:23:17.278852 |
976 |
56644814 |
CONS PUCCA DRAIN WITH COVER SLAB FROM NASIR SK HO TOWARDS NEKRAUL HOUSE AT GHUSKIRA |
99949 |
CONS PUCCA DRAIN WITH COVER SLAB FROM NASIR SK HO TOWARDS NEKRAUL HOUSE AT GHUSKIRA1 |
Roof laid |
-
latitude : 24.41988219,24.41989309,24.41989527
Longitude : 87.85857601,87.85851558,87.85851982
file name : Image_04052023132356907.png
|
2023-05-04 13:23:56.989943 |
977 |
56644814 |
CONS PUCCA DRAIN WITH COVER SLAB FROM NASIR SK HO TOWARDS NEKRAUL HOUSE AT GHUSKIRA |
99949 |
CONS PUCCA DRAIN WITH COVER SLAB FROM NASIR SK HO TOWARDS NEKRAUL HOUSE AT GHUSKIRA1 |
Plinth level |
-
latitude : 24.4197217,24.4197265,24.41985748
Longitude : 87.8583706,87.8583675,87.85852176
file name : Image_12042023111328630.png
|
2023-04-12 11:13:28.728573 |
978 |
56644814 |
CONS PUCCA DRAIN WITH COVER SLAB FROM NASIR SK HO TOWARDS NEKRAUL HOUSE AT GHUSKIRA |
99949 |
CONS PUCCA DRAIN WITH COVER SLAB FROM NASIR SK HO TOWARDS NEKRAUL HOUSE AT GHUSKIRA1 |
Completion of work |
-
latitude : 24.4197276,24.4197276,24.4197271
Longitude : 87.8583676,87.8583676,87.85837
file name : Image_12042023110806513.png
|
2023-04-12 11:08:06.618227 |
979 |
68176850 |
Creation of drainage channel for management of grey water |
99990 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.418176666666668
Longitude : 87.85691333333334
file name : Image_08022024101450507.png
|
2024-02-08 10:14:50.604739 |
980 |
68176850 |
Creation of drainage channel for management of grey water |
99990 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.418256666666668
Longitude : 87.85674333333333
file name : Image_22012024121124926.png
|
2024-01-22 12:11:25.01293 |
981 |
68176850 |
Creation of drainage channel for management of grey water |
99990 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.418153333333333
Longitude : 87.85688833333333
file name : Image_17012024135928000.png
|