1 |
34780285 |
Maintanance of Road with PCC from Dhananjoy house to birbal house at silogram |
150000 |
Maintanance of Road with PCC from Dhananjoy house to birbal house at silogram1 |
Roof laid |
-
latitude : 24.193917964585125,24.193847263231874,24.193780040368438
Longitude : 87.91879439726472,87.9187903739512,87.91876690462232
file name : Image_27012021115637567.png
|
2021-01-27 11:56:37.66301 |
2 |
34780285 |
Maintanance of Road with PCC from Dhananjoy house to birbal house at silogram |
150000 |
Maintanance of Road with PCC from Dhananjoy house to birbal house at silogram1 |
Plinth level |
-
latitude : 24.193947510793805,24.193604146130383
Longitude : 87.91875801980495,87.91870797984302
file name : Image_27012021101018098.png
|
2021-01-27 10:10:18.1601 |
3 |
34780285 |
Maintanance of Road with PCC from Dhananjoy house to birbal house at silogram |
150000 |
Maintanance of Road with PCC from Dhananjoy house to birbal house at silogram1 |
Plinth level |
-
latitude : 24.193947510793805,24.193604146130383
Longitude : 87.91875801980495,87.91870797984302
file name : Image_27012021101139508.png
|
2021-01-27 10:11:39.571425 |
4 |
34780285 |
Maintanance of Road with PCC from Dhananjoy house to birbal house at silogram |
150000 |
Maintanance of Road with PCC from Dhananjoy house to birbal house at silogram1 |
Completion of work |
-
latitude : 24.19392064679414,24.193609762005508
Longitude : 87.91873371228576,87.91870571672916
file name : Image_10012021122209068.png
|
2021-01-10 12:22:09.140367 |
5 |
34767746 |
Maintanance of road with PCC from Nayan hazra house to Prafulla mondal house at Joychandrapur |
120000 |
Maintanance of road with PCC from Nayan hazra house to Prafulla mondal house at Joychandrapur1 |
Plinth level |
-
latitude : 24.193545933812857,24.193505700677633,24.193475106731057
Longitude : 87.95575129799545,87.95576370321214,87.95576789416373
file name : Image_27012021105710938.png
|
2021-01-27 10:57:11.039173 |
6 |
34767746 |
Maintanance of road with PCC from Nayan hazra house to Prafulla mondal house at Joychandrapur |
120000 |
Maintanance of road with PCC from Nayan hazra house to Prafulla mondal house at Joychandrapur1 |
Roof laid |
-
latitude : 24.193523260764778,24.193507209420204
Longitude : 87.95576906763017,87.95576236210763
file name : Image_27012021110020881.png
|
2021-01-27 11:00:20.972081 |
7 |
34767746 |
Maintanance of road with PCC from Nayan hazra house to Prafulla mondal house at Joychandrapur |
120000 |
Maintanance of road with PCC from Nayan hazra house to Prafulla mondal house at Joychandrapur1 |
Completion of work |
-
latitude : 24.193574097007513,24.19348751194775
Longitude : 87.95575683005154,87.9557471908629
file name : Image_11012021094805396.png
|
2021-01-11 09:48:05.499435 |
8 |
39106306 |
Maint drain inc soakpit cover PCC Srikrishana mondal house to Sudam mondal house at Joyc |
300000 |
Maint drain inc soakpit cover PCC Srikrishana mondal house to Sudam mondal house at Joyc1 |
Completion of work |
-
latitude : 24.195361915044487,24.195369416847825
Longitude : 87.955287611112,87.95528165996075
file name : Image_23032021091715789.png
|
2021-03-23 09:17:15.853205 |
9 |
39106306 |
Maint drain inc soakpit cover PCC Srikrishana mondal house to Sudam mondal house at Joyc |
300000 |
Maint drain inc soakpit cover PCC Srikrishana mondal house to Sudam mondal house at Joyc1 |
Roof laid |
-
latitude : 24.195337062701583,24.195072781294584
Longitude : 87.95504143461585,87.95548374764621
file name : Image_23032021093306796.png
|
2021-03-23 09:33:06.878819 |
10 |
39106306 |
Maint drain inc soakpit cover PCC Srikrishana mondal house to Sudam mondal house at Joyc |
300000 |
Maint drain inc soakpit cover PCC Srikrishana mondal house to Sudam mondal house at Joyc1 |
Completion of work |
-
latitude : 24.195271977223456,24.195238994434476,24.19513635803014
Longitude : 87.95530269853771,87.9553687479347,87.95543278567493
file name : Image_25022021081715786.png
|
2021-02-25 08:17:15.841534 |
11 |
34782831 |
Maintanance of Road with PCC from Ainal house to Nurselim house at silogram |
100000 |
Maintanance of Road with PCC from Ainal house to Nurselim house at silogram1 |
Plinth level |
-
latitude : 24.19686210807413,24.19682577252388
Longitude : 87.9140636511147,87.9144244082272
file name : Image_27012021100959052.png
|
2021-01-27 10:09:59.13854 |
12 |
34782831 |
Maintanance of Road with PCC from Ainal house to Nurselim house at silogram |
100000 |
Maintanance of Road with PCC from Ainal house to Nurselim house at silogram1 |
Roof laid |
-
latitude : 24.196861647069454,24.196858713403344,24.196827323175967
Longitude : 87.91410438716412,87.9141918104142,87.91438593529165
file name : Image_27012021121956747.png
|
2021-01-27 12:19:56.817251 |
13 |
34782831 |
Maintanance of Road with PCC from Ainal house to Nurselim house at silogram |
100000 |
Maintanance of Road with PCC from Ainal house to Nurselim house at silogram1 |
Completion of work |
-
latitude : 24.196858503855765,24.19710250105709
Longitude : 87.91396399028599,87.91411184705794
file name : Image_09012021121335604.png
|
2021-01-09 12:13:35.666595 |
14 |
39105476 |
Sinking a newmark II tubewell with platform and saokpit near Mukul brick vata at jhitkepara |
80000 |
Sinking a newmark II tubewell with platform and saokpit near Mukul brick vata at jhitkepara1 |
Completion of work |
-
latitude : 24.216286666666665
Longitude : 87.91866666666668
file name : Image_03092021114753763.png
|
2021-09-03 11:47:53.849535 |
15 |
39105476 |
Sinking a newmark II tubewell with platform and saokpit near Mukul brick vata at jhitkepara |
80000 |
Sinking a newmark II tubewell with platform and saokpit near Mukul brick vata at jhitkepara1 |
Plinth level |
-
latitude : 24.216301666666663
Longitude : 87.91867166666667
file name : Image_03092021115127704.png
|
2021-09-03 11:51:27.791257 |
16 |
39105476 |
Sinking a newmark II tubewell with platform and saokpit near Mukul brick vata at jhitkepara |
80000 |
Sinking a newmark II tubewell with platform and saokpit near Mukul brick vata at jhitkepara1 |
Roof laid |
-
latitude : 24.216291666666667
Longitude : 87.91864666666667
file name : Image_03092021115240255.png
|
2021-09-03 11:52:40.344114 |
17 |
39106492 |
Maint drain inc soakpit cover PCC Guruprasad sahu house to SSK school at silogram |
150000 |
Maint drain inc soakpit cover PCC Guruprasad sahu house to SSK school at silogram1 |
Roof laid |
-
latitude : 24.19365112669766,24.195133592002094,24.19535135384649,24.195428006350994
Longitude : 87.91870219632983,87.91809727437794,87.91812493465841,87.91814270429313
file name : Image_23032021115029505.png
|
2021-03-23 11:50:29.612257 |
18 |
39106492 |
Maint drain inc soakpit cover PCC Guruprasad sahu house to SSK school at silogram |
150000 |
Maint drain inc soakpit cover PCC Guruprasad sahu house to SSK school at silogram1 |
Completion of work |
-
latitude : 24.195076008327305,24.195122737437487
Longitude : 87.91810574010015,87.91811345145106
file name : Image_25022021090143357.png
|
2021-02-25 09:01:43.432341 |
19 |
39106492 |
Maint drain inc soakpit cover PCC Guruprasad sahu house to SSK school at silogram |
150000 |
Maint drain inc soakpit cover PCC Guruprasad sahu house to SSK school at silogram1 |
Plinth level |
-
latitude : 24.195048892870545,24.195290836505592
Longitude : 87.9181045666337,87.91815343312919
file name : Image_26022021164426823.png
|
2021-02-26 16:44:26.909196 |
20 |
34824873 |
Maintanance of Road with PCC from Nakfuri sk house to Dulal sk house at Harirampur |
100000 |
Maintanance of Road with PCC from Nakfuri sk house to Dulal sk house at Harirampur1 |
Roof laid |
-
latitude : 24.16791931260377,24.167929119430482
Longitude : 87.9122918844223,87.91238995268941
file name : Image_11012021132549371.png
|
2021-01-11 13:25:49.443993 |
21 |
34824873 |
Maintanance of Road with PCC from Nakfuri sk house to Dulal sk house at Harirampur |
100000 |
Maintanance of Road with PCC from Nakfuri sk house to Dulal sk house at Harirampur1 |
Plinth level |
-
latitude : 24.168014489114285,24.167973794974387
Longitude : 87.91232767514884,87.91239615529776
file name : Image_11012021131110093.png
|
2021-01-11 13:11:10.154065 |
22 |
34824873 |
Maintanance of Road with PCC from Nakfuri sk house to Dulal sk house at Harirampur |
100000 |
Maintanance of Road with PCC from Nakfuri sk house to Dulal sk house at Harirampur1 |
Completion of work |
-
latitude : 24.167949655093253,24.167912690900266
Longitude : 87.91238249279559,87.91238115169108
file name : Image_09012021104713907.png
|
2021-01-09 10:47:13.995198 |
23 |
34775807 |
Maintanance of protection wall with PCC at Ramsagar pond at Balsa |
160000 |
Maintanance of protection wall with PCC at Ramsagar pond at Balsa1 |
Completion of work |
-
latitude : 24.219769136980176,24.21972995158285
Longitude : 87.94366995804012,87.94362804852426
file name : Image_02022021171756752.png
|
2021-02-02 17:17:56.815554 |
24 |
34775807 |
Maintanance of protection wall with PCC at Ramsagar pond at Balsa |
160000 |
Maintanance of protection wall with PCC at Ramsagar pond at Balsa1 |
Plinth level |
-
latitude : 24.219735944643617,24.219734854996204
Longitude : 87.94359100051224,87.94359955005348
file name : Image_02022021172047838.png
|
2021-02-02 17:20:47.907632 |
25 |
34775807 |
Maintanance of protection wall with PCC at Ramsagar pond at Balsa |
160000 |
Maintanance of protection wall with PCC at Ramsagar pond at Balsa1 |
Roof laid |
-
latitude : 24.219759455882013,24.219743739813566
Longitude : 87.943632658571,87.94363223947585
file name : Image_02022021172247748.png
|
2021-02-02 17:22:47.814829 |
26 |
34861797 |
Maintanance of Roadside wall with PCC From Choto masjid sanko to masjid end at pirtalapara |
250000 |
Maintanance of Roadside wall with PCC From Choto masjid sanko to masjid end at pirtalapara1 |
Completion of work |
-
latitude : 24.209027183242142,24.209026847966015,24.209025339223444
Longitude : 87.91622190736234,87.91620380245149,87.91618603281677
file name : Image_02022021165611056.png
|
2021-02-02 16:56:11.154694 |
27 |
34861797 |
Maintanance of Roadside wall with PCC From Choto masjid sanko to masjid end at pirtalapara |
250000 |
Maintanance of Roadside wall with PCC From Choto masjid sanko to masjid end at pirtalapara1 |
Plinth level |
-
latitude : 24.20899633783847,24.209010167978704
Longitude : 87.91622349992394,87.91619240306318
file name : Image_02022021170001807.png
|
2021-02-02 17:00:01.909507 |
28 |
34861797 |
Maintanance of Roadside wall with PCC From Choto masjid sanko to masjid end at pirtalapara |
250000 |
Maintanance of Roadside wall with PCC From Choto masjid sanko to masjid end at pirtalapara1 |
Roof laid |
-
latitude : 24.209017627872527,24.209031416103244
Longitude : 87.91614018380642,87.91616532951593
file name : Image_02022021170144609.png
|
2021-02-02 17:01:44.683753 |
29 |
39106466 |
Maint drain inc soakpit cover PCC Madhupur main road to masjid at madhupur |
230000 |
Maint drain inc soakpit cover PCC Madhupur main road to masjid at madhupur1 |
Plinth level |
-
latitude : 24.206529166549444,24.206386380828917,24.2063466925174
Longitude : 87.93300398625433,87.93295352719724,87.93293852359056
file name : Image_23032021123919801.png
|
2021-03-23 12:39:19.878193 |
30 |
39106466 |
Maint drain inc soakpit cover PCC Madhupur main road to masjid at madhupur |
230000 |
Maint drain inc soakpit cover PCC Madhupur main road to masjid at madhupur1 |
Roof laid |
-
latitude : 24.20653821900487,24.206437719985843,24.20631412882358,24.206265094690025
Longitude : 87.93297364376485,87.93299283832312,87.93294397182763,87.93292771093547
file name : Image_23032021134330235.png
|
2021-03-23 13:43:30.32476 |
31 |
39106466 |
Maint drain inc soakpit cover PCC Madhupur main road to masjid at madhupur |
230000 |
Maint drain inc soakpit cover PCC Madhupur main road to masjid at madhupur1 |
Completion of work |
-
latitude : 24.206491238437593,24.206490023061633
Longitude : 87.93298621661961,87.93299417942762
file name : Image_26022021140755230.png
|
2021-02-26 14:07:55.297138 |
32 |
34822918 |
Maintanance of Road with PCC from Kadam sk house to Masjid at Koyemba |
150000 |
Maintanance of Road with PCC from Kadam sk house to Masjid at Koyemba1 |
Completion of work |
-
latitude : 24.178171,24.173225392587483
Longitude : 87.9097286,87.90875069797039
file name : Image_18022021133500506.png
|
2021-02-18 13:35:00.588996 |
33 |
34822918 |
Maintanance of Road with PCC from Kadam sk house to Masjid at Koyemba |
150000 |
Maintanance of Road with PCC from Kadam sk house to Masjid at Koyemba1 |
Completion of work |
-
latitude : 24.17320041451603,24.173215460032225
Longitude : 87.90876385755837,87.9087467584759
file name : Image_18022021133613222.png
|
2021-02-18 13:36:13.312741 |
34 |
34822918 |
Maintanance of Road with PCC from Kadam sk house to Masjid at Koyemba |
150000 |
Maintanance of Road with PCC from Kadam sk house to Masjid at Koyemba1 |
Completion of work |
-
latitude : 24.17320041451603,24.173215460032225
Longitude : 87.90876385755837,87.9087467584759
file name : Image_18022021133757461.png
|
2021-02-18 13:37:57.547558 |
35 |
34822918 |
Maintanance of Road with PCC from Kadam sk house to Masjid at Koyemba |
150000 |
Maintanance of Road with PCC from Kadam sk house to Masjid at Koyemba1 |
Plinth level |
-
latitude : 24.173082103952765,24.17318494990468
Longitude : 87.90876033715904,87.90877047926188
file name : Image_18022021134224739.png
|
2021-02-18 13:42:24.82694 |
36 |
34822918 |
Maintanance of Road with PCC from Kadam sk house to Masjid at Koyemba |
150000 |
Maintanance of Road with PCC from Kadam sk house to Masjid at Koyemba1 |
Roof laid |
-
latitude : 24.173167389817536,24.173159594647586
Longitude : 87.90877274237573,87.90876637212932
file name : Image_18022021134503288.png
|
2021-02-18 13:45:03.378506 |
37 |
34751591 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area |
440000 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area1 |
Roof laid |
-
latitude : 24.2120996
Longitude : 87.9161745
file name : Image_27032021135549442.png
|
2021-03-27 13:55:49.540399 |
38 |
34751591 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area |
440000 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area1 |
Completion of work |
-
latitude : 24.2121315
Longitude : 87.916201
file name : Image_26022021172811342.png
|
2021-02-26 17:28:11.409454 |
39 |
34751591 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area |
440000 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area1 |
Plinth level |
-
latitude : 24.2121161
Longitude : 87.9161951
file name : Image_26022021174826181.png
|
2021-02-26 17:48:26.265739 |
40 |
34751591 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area |
440000 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area1 |
Plinth level |
-
latitude : 24.212118
Longitude : 87.9161957
file name : Image_26022021175121360.png
|
2021-02-26 17:51:21.43996 |
41 |
34751591 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area |
440000 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area1 |
Roof laid |
-
latitude : 24.2120996
Longitude : 87.9161745
file name : Image_27032021135544745.png
|
2021-03-27 13:55:44.85961 |
42 |
34751591 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area |
440000 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area1 |
Completion of work |
-
latitude : 24.2121073
Longitude : 87.9161924
file name : Image_26022021172843957.png
|
2021-02-26 17:28:44.028877 |
43 |
34751591 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area |
440000 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area1 |
Plinth level |
-
latitude : 24.212118
Longitude : 87.9161957
file name : Image_26022021174915786.png
|
2021-02-26 17:49:15.87329 |
44 |
34751591 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area |
440000 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area1 |
Plinth level |
-
latitude : 24.212118
Longitude : 87.9161957
file name : Image_26022021175022039.png
|
2021-02-26 17:50:22.127576 |
45 |
34751591 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area |
440000 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area1 |
Plinth level |
-
latitude : 24.212118
Longitude : 87.9161957
file name : Image_26022021175125228.png
|
2021-02-26 17:51:25.235112 |
46 |
34751591 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area |
440000 |
Purchase of Tubewell Parts for Repairing of tubewell of whole gp area1 |
Plinth level |
-
latitude : 24.212118
Longitude : 87.9161957
file name : Image_26022021175153549.png
|
2021-02-26 17:51:53.636352 |
47 |
46686678 |
Maintanance and Repiar of Tubewell at dunigram paschim and Miyapara and pirtalapara and jhikkepar |
200000 |
Maintanance and Repiar of Tubewell at dunigram paschim and Miyapara and pirtalapara and jhikkepar1 |
Plinth level |
-
latitude : 24.21205166666667
Longitude : 87.91617833333333
file name : Image_03032022151234031.png
|
2022-03-03 15:12:34.085073 |
48 |
46686678 |
Maintanance and Repiar of Tubewell at dunigram paschim and Miyapara and pirtalapara and jhikkepar |
200000 |
Maintanance and Repiar of Tubewell at dunigram paschim and Miyapara and pirtalapara and jhikkepar1 |
Completion of work |
-
latitude : 24.2120831
Longitude : 87.916157
file name : Image_03032022150154196.png
|
2022-03-03 15:01:54.250779 |
49 |
46686815 |
Maintanance and Repiar of Tubewell at shilgram sansad no 6 and 7 and Chandpara 8 and 9 under Dunigr |
100000 |
Maintanance and Repiar of Tubewell at shilgram sansad no 6 and 7 and Chandpara 8 and 9 under Dunigr1 |
Plinth level |
-
latitude : 24.211983333333333
Longitude : 87.91638999999999
file name : Image_03032022151013106.png
|
2022-03-03 15:10:13.172423 |
50 |
46686815 |
Maintanance and Repiar of Tubewell at shilgram sansad no 6 and 7 and Chandpara 8 and 9 under Dunigr |
100000 |
Maintanance and Repiar of Tubewell at shilgram sansad no 6 and 7 and Chandpara 8 and 9 under Dunigr1 |
Completion of work |
-
latitude : 24.212084
Longitude : 87.9161579
file name : Image_03032022150301706.png
|
2022-03-03 15:03:01.765732 |
51 |
46686967 |
Maintanance and Repiar of Tubewell at Kayemba and kamra and Harirampur under Dunigram GP |
100000 |
Maintanance and Repiar of Tubewell at Kayemba and kamra and Harirampur under Dunigram GP1 |
Plinth level |
-
latitude : 24.212061666666667
Longitude : 87.91613166666666
file name : Image_03032022150910914.png
|
2022-03-03 15:09:10.97141 |
52 |
46686967 |
Maintanance and Repiar of Tubewell at Kayemba and kamra and Harirampur under Dunigram GP |
100000 |
Maintanance and Repiar of Tubewell at Kayemba and kamra and Harirampur under Dunigram GP1 |
Completion of work |
-
latitude : 24.212086666666664
Longitude : 87.91613000000001
file name : Image_03032022150423682.png
|
2022-03-03 15:04:23.741399 |
53 |
47244644 |
Construction of Culvert with PCC near choto masjid at Pirtalapara |
60000 |
Construction of Culvert with PCC near choto masjid at Pirtalapara1 |
Completion of work |
-
latitude : 24.21217,24.209076666666668
Longitude : 87.91619166666666,87.91609500000001
file name : Image_23112021134018622.png
|
2021-11-23 13:40:18.706976 |
54 |
47244644 |
Construction of Culvert with PCC near choto masjid at Pirtalapara |
60000 |
Construction of Culvert with PCC near choto masjid at Pirtalapara1 |
Plinth level |
-
latitude : 24.209088333333337,24.209088333333337
Longitude : 87.916045,87.91604166666666
file name : Image_23112021134223262.png
|
2021-11-23 13:42:23.33516 |
55 |
47244644 |
Construction of Culvert with PCC near choto masjid at Pirtalapara |
60000 |
Construction of Culvert with PCC near choto masjid at Pirtalapara1 |
Roof laid |
-
latitude : 24.209068333333335,24.209068333333335
Longitude : 87.91607,87.91607
file name : Image_23112021134322740.png
|
2021-11-23 13:43:22.809764 |
56 |
39105492 |
Sinking of submersible pump with pipe line at kalitala at Jhitkepara. |
240000 |
Sinking of submersible pump with pipe line at kalitala at Jhitkepara.1 |
Completion of work |
-
latitude : 24.21287
Longitude : 87.91910333333333
file name : Image_28092021101609362.png
|
2021-09-28 10:16:09.437366 |
57 |
39105492 |
Sinking of submersible pump with pipe line at kalitala at Jhitkepara. |
240000 |
Sinking of submersible pump with pipe line at kalitala at Jhitkepara.1 |
Plinth level |
-
latitude : 24.212910000000004
Longitude : 87.91909833333332
file name : Image_28092021101719396.png
|
2021-09-28 10:17:19.457298 |
58 |
39105492 |
Sinking of submersible pump with pipe line at kalitala at Jhitkepara. |
240000 |
Sinking of submersible pump with pipe line at kalitala at Jhitkepara.1 |
Roof laid |
-
latitude : 24.21290333333333
Longitude : 87.91910000000001
file name : Image_28092021101928799.png
|
2021-09-28 10:19:28.861464 |
59 |
47242497 |
Construction of new PCC road from HridayRanjan Marjit field to Gosaivasa pond at Chandpara |
250000 |
Construction of new PCC road from HridayRanjan Marjit field to Gosaivasa pond at Chandpara1 |
Plinth level |
-
latitude : 24.185545,24.18557333333333,24.185579999999998
Longitude : 87.91206166666667,87.91208833333333,87.91209666666667
file name : Image_10022022124926032.png
|
2022-02-10 12:49:26.1142 |
60 |
47242497 |
Construction of new PCC road from HridayRanjan Marjit field to Gosaivasa pond at Chandpara |
250000 |
Construction of new PCC road from HridayRanjan Marjit field to Gosaivasa pond at Chandpara1 |
Roof laid |
-
latitude : 24.185516666666665,24.18551166666667,24.18551166666667
Longitude : 87.91205166666666,87.91204666666665,87.91204666666665
file name : Image_10022022125100726.png
|
2022-02-10 12:51:00.795841 |
61 |
47242497 |
Construction of new PCC road from HridayRanjan Marjit field to Gosaivasa pond at Chandpara |
250000 |
Construction of new PCC road from HridayRanjan Marjit field to Gosaivasa pond at Chandpara1 |
Completion of work |
-
latitude : 24.186221666666665,24.186224999999997,24.186231666666664
Longitude : 87.91210833333335,87.91210833333335,87.91210000000001
file name : Image_01022022134328964.png
|
2022-02-01 13:43:29.0908 |
62 |
47242497 |
Construction of new PCC road from HridayRanjan Marjit field to Gosaivasa pond at Chandpara |
250000 |
Construction of new PCC road from HridayRanjan Marjit field to Gosaivasa pond at Chandpara1 |
Completion of work |
-
latitude : 24.186268333333334,24.186269999999997,24.186269999999997,24.186269999999997
Longitude : 87.91214166666666,87.91214166666666,87.91214166666666,87.91214166666666
file name : Image_01022022134333145.png
|
2022-02-01 13:43:33.25122 |
63 |
47241773 |
Construction of new PCC road Molin Ali house to Mannan Ali house at Shilgram |
250000 |
Construction of new PCC road Molin Ali house to Mannan Ali house at Shilgram1 |
Completion of work |
-
latitude : 24.195125,24.19512166666667,24.19512166666667
Longitude : 87.91719666666668,87.91719333333334,87.91719333333334
file name : Image_01022022130514392.png
|
2022-02-01 13:05:14.458125 |
64 |
46654541 |
Installation of Submersible pump inc pipeline and tap and platform near Anarul sk house at Babladang |
150000 |
Installation of Submersible pump inc pipeline and tap and platform near Anarul sk house at Babladang1 |
Completion of work |
-
latitude : 24.194701666666667,24.194695000000003,24.194698333333335
Longitude : 87.96932166666666,87.96932333333334,87.96931833333335
file name : Image_18032022101835580.png
|
2022-03-18 10:18:35.633091 |
65 |
46684320 |
Construction of new PCC drain with cover slab Drain with PCC from Munsur sk house to Horej kha house |
240000 |
Construction of new PCC drain with cover slab Drain with PCC from Munsur sk house to Horej kha house1 |
Completion of work |
-
latitude : 24.174298333333333,24.174301666666665,24.174301666666665
Longitude : 87.90732833333335,87.90733,87.90733
file name : Image_01022022132724519.png
|
2022-02-01 13:27:24.614021 |
66 |
46684320 |
Construction of new PCC drain with cover slab Drain with PCC from Munsur sk house to Horej kha house |
240000 |
Construction of new PCC drain with cover slab Drain with PCC from Munsur sk house to Horej kha house1 |
Completion of work |
-
latitude : 24.174298333333333,24.174301666666665,24.174301666666665
Longitude : 87.90732833333335,87.90733,87.90733
file name : Image_01022022132728917.png
|
2022-02-01 13:27:28.990363 |
67 |
47242120 |
Construction of new PCC road Enamul house to Mehebub house at Shilgram |
125000 |
Construction of new PCC road Enamul house to Mehebub house at Shilgram1 |
Completion of work |
-
latitude : 24.196508333333334,24.196508333333334,24.196508333333334,24.196508333333334
Longitude : 87.91679333333335,87.91679333333335,87.91679333333335,87.91679333333335
file name : Image_03022022111548159.png
|
2022-02-03 11:15:48.232589 |
68 |
47242120 |
Construction of new PCC road Enamul house to Mehebub house at Shilgram |
125000 |
Construction of new PCC road Enamul house to Mehebub house at Shilgram1 |
Plinth level |
-
latitude : 24.196491666666663,24.19649,24.19649
Longitude : 87.91679500000001,87.91679333333335,87.91679333333335
file name : Image_22022022122239063.png
|
2022-02-22 12:22:39.136554 |
69 |
46654405 |
Instalation of Submersible pump inc pipeline and tap and platform near Daud house at Babladanga |
150000 |
Instalation of Submersible pump inc pipeline and tap and platform near Daud house at Babladanga1 |
Completion of work |
-
latitude : 24.2120852,24.2120832
Longitude : 87.916139,87.9161384
file name : Image_15032022134818724.png
|
2022-03-15 13:48:18.803154 |
70 |
47241966 |
Construction of new PCC road Jagatbandhu marjit house to Jamini Marjit house at Shilgram |
125000 |
Construction of new PCC road Jagatbandhu marjit house to Jamini Marjit house at Shilgram1 |
Plinth level |
-
latitude : 24.198436666666666,24.198433333333334,24.198433333333334,24.19842833333333
Longitude : 87.91685833333334,87.91682999999999,87.91682999999999,87.91682333333334
file name : Image_03022022121646875.png
|
2022-02-03 12:16:46.943101 |
71 |
47241966 |
Construction of new PCC road Jagatbandhu marjit house to Jamini Marjit house at Shilgram |
125000 |
Construction of new PCC road Jagatbandhu marjit house to Jamini Marjit house at Shilgram1 |
Completion of work |
-
latitude : 24.19844333333333,24.19844333333333,24.19844333333333
Longitude : 87.91677833333333,87.91677833333333,87.91677833333333
file name : Image_01022022132719591.png
|
2022-02-01 13:27:19.683598 |
72 |
46686260 |
Maintanance and Repiar of Tubewell 3 nos sansads Joychandrapur and Gopalpur and Babladanga under d |
100000 |
Maintanance and Repiar of Tubewell 3 nos sansads Joychandrapur and Gopalpur and Babladanga under d1 |
Plinth level |
-
latitude : 24.2122699
Longitude : 87.9161103
file name : Image_03032022151446473.png
|
2022-03-03 15:14:46.531087 |
73 |
46686260 |
Maintanance and Repiar of Tubewell 3 nos sansads Joychandrapur and Gopalpur and Babladanga under d |
100000 |
Maintanance and Repiar of Tubewell 3 nos sansads Joychandrapur and Gopalpur and Babladanga under d1 |
Completion of work |
-
latitude : 24.212108333333337
Longitude : 87.91622333333335
file name : Image_03032022145535551.png
|
2022-03-03 14:55:35.638702 |
74 |
46686534 |
Maintanance and Repiar of Tubewell 3 nos sansads Motain and kabirajpur and Balsa under Dunigram GP |
300000 |
Maintanance and Repiar of Tubewell 3 nos sansads Motain and kabirajpur and Balsa under Dunigram GP1 |
Plinth level |
-
latitude : 24.212056666666665
Longitude : 87.91617833333333
file name : Image_03032022151409388.png
|
2022-03-03 15:14:09.447136 |
75 |
46686534 |
Maintanance and Repiar of Tubewell 3 nos sansads Motain and kabirajpur and Balsa under Dunigram GP |
300000 |
Maintanance and Repiar of Tubewell 3 nos sansads Motain and kabirajpur and Balsa under Dunigram GP1 |
Completion of work |
-
latitude : 24.2120831
Longitude : 87.916157
file name : Image_03032022145921659.png
|
2022-03-03 14:59:21.783815 |
76 |
47247410 |
Installation of solar electricfication of GP office building |
490000 |
Installation of solar electricfication of GP office building1 |
Completion of work |
-
latitude : 24.2120831
Longitude : 87.9161563
file name : Image_07032022164711974.png
|
2022-03-07 16:47:12.051152 |
77 |
47247410 |
Installation of solar electricfication of GP office building |
490000 |
Installation of solar electricfication of GP office building1 |
Plinth level |
-
latitude : 24.212083333333332
Longitude : 87.91618333333332
file name : Image_07032022164947873.png
|
2022-03-07 16:49:48.006992 |
78 |
46684920 |
Sinking a new tubewell mark II with platform soakpit and drain near Pirtala at Chotochowki |
60000 |
Sinking a new tubewell mark II with platform soakpit and drain near Pirtala at Chotochowki1 |
Completion of work |
-
latitude : 24.20949
Longitude : 87.92926833333334
file name : Image_16032022135313398.png
|
2022-03-16 13:53:13.472975 |
79 |
46684920 |
Sinking a new tubewell mark II with platform soakpit and drain near Pirtala at Chotochowki |
60000 |
Sinking a new tubewell mark II with platform soakpit and drain near Pirtala at Chotochowki1 |
Plinth level |
-
latitude : 24.21381333333333
Longitude : 87.91411000000001
file name : Image_16032022135525282.png
|
2022-03-16 13:55:25.357721 |
80 |
47243335 |
Construction of new PCC road from Aminur house to borku house at via raihan house to babnar ghat at |
200000 |
Construction of new PCC road from Aminur house to borku house at via raihan house to babnar ghat at 1 |
Completion of work |
-
latitude : 24.209796666666662,24.209796666666662,24.209796666666662
Longitude : 87.91519166666667,87.91519166666667,87.91519166666667
file name : Image_17032022132617516.png
|
2022-03-17 13:26:17.592879 |
81 |
47243335 |
Construction of new PCC road from Aminur house to borku house at via raihan house to babnar ghat at |
200000 |
Construction of new PCC road from Aminur house to borku house at via raihan house to babnar ghat at 1 |
Plinth level |
-
latitude : 24.20982333333333,24.20982333333333
Longitude : 87.91505333333335,87.91505333333335
file name : Image_17032022133050815.png
|
2022-03-17 13:30:50.889107 |
82 |
47243335 |
Construction of new PCC road from Aminur house to borku house at via raihan house to babnar ghat at |
200000 |
Construction of new PCC road from Aminur house to borku house at via raihan house to babnar ghat at 1 |
Roof laid |
-
latitude : 24.20979833333333,24.209789999999998,24.209789999999998,24.20979333333333
Longitude : 87.91507166666666,87.91506833333332,87.91506833333332,87.91508
file name : Image_17032022133248036.png
|
2022-03-17 13:32:48.098824 |
83 |
46654674 |
Installationof Submersible pump inc pipeline and tap and platform near Laxmitala nupur let house a |
250000 |
Installationof Submersible pump inc pipeline and tap and platform near Laxmitala nupur let house a1 |
Roof laid |
-
latitude : 24.212143333333334,24.212143333333334
Longitude : 87.91496666666666,87.91496666666666
file name : Image_22032022153546953.png
|
2022-03-22 15:35:47.01505 |
84 |
46654674 |
Installationof Submersible pump inc pipeline and tap and platform near Laxmitala nupur let house a |
250000 |
Installationof Submersible pump inc pipeline and tap and platform near Laxmitala nupur let house a1 |
Plinth level |
-
latitude : 24.212134999999996,24.212134999999996
Longitude : 87.91615833333331,87.91615833333331
file name : Image_22032022152919747.png
|
2022-03-22 15:29:19.818643 |
85 |
46685772 |
Construction of new PCC drain with cover slab from Lalan miya house to Bela pond via masjid at Dunig |
250000 |
Construction of new PCC drain with cover slab from Lalan miya house to Bela pond via masjid at Dunig1 |
Roof laid |
-
latitude : 24.211881666666667,24.211881666666667,24.211881666666667,24.211881666666667
Longitude : 87.91599833333333,87.91599833333333,87.91599833333333,87.91599833333333
file name : Image_25032022155826743.png
|
2022-03-25 15:58:26.814931 |
86 |
46685772 |
Construction of new PCC drain with cover slab from Lalan miya house to Bela pond via masjid at Dunig |
250000 |
Construction of new PCC drain with cover slab from Lalan miya house to Bela pond via masjid at Dunig1 |
Plinth level |
-
latitude : 24.212079,24.212079,24.212079,24.212079
Longitude : 87.9161534,87.9161534,87.9161534,87.9161534
file name : Image_25032022155508727.png
|
2022-03-25 15:55:08.813934 |
87 |
46685772 |
Construction of new PCC drain with cover slab from Lalan miya house to Bela pond via masjid at Dunig |
250000 |
Construction of new PCC drain with cover slab from Lalan miya house to Bela pond via masjid at Dunig1 |
Completion of work |
-
latitude : 24.214328333333334,24.214328333333334
Longitude : 87.91467499999999,87.91467499999999
file name : Image_04032022141430539.png
|
2022-03-04 14:14:30.616487 |
88 |
46685772 |
Construction of new PCC drain with cover slab from Lalan miya house to Bela pond via masjid at Dunig |
250000 |
Construction of new PCC drain with cover slab from Lalan miya house to Bela pond via masjid at Dunig1 |
Plinth level |
-
latitude : 24.21434,24.21434
Longitude : 87.91474333333332,87.91474333333332
file name : Image_04032022141801933.png
|
2022-03-04 14:18:01.996166 |
89 |
46685286 |
Construction of new PCC drain with cover slab from Kalam house to Aminul house at Jhitkepara |
150000 |
Construction of new PCC drain with cover slab from Kalam house to Aminul house at Jhitkepara1 |
Plinth level |
-
latitude : 24.2120839,24.2120839,24.2120839
Longitude : 87.9161523,87.9161523,87.9161523
file name : Image_25032022161330532.png
|
2022-03-25 16:13:30.599396 |
90 |
46685286 |
Construction of new PCC drain with cover slab from Kalam house to Aminul house at Jhitkepara |
150000 |
Construction of new PCC drain with cover slab from Kalam house to Aminul house at Jhitkepara1 |
Completion of work |
-
latitude : 24.2120843,24.2120843,24.2120802
Longitude : 87.9161558,87.9161558,87.9161532
file name : Image_25032022160958926.png
|
2022-03-25 16:09:58.98425 |
91 |
47244326 |
Construction of new PCC road from Motiur house to Eslam house at Pirtalapara |
50000 |
Construction of new PCC road from Motiur house to Eslam house at Pirtalapara1 |
Completion of work |
-
latitude : 24.210773333333336,24.210773333333336,24.210773333333336
Longitude : 87.91915666666667,87.91915666666667,87.91915666666667
file name : Image_05082022142647393.png
|
2022-08-05 14:26:47.488985 |
92 |
46653965 |
Construction of new PCC drain with cover slab from Arun Mondal house to Ashish Mondal house at Joy |
250000 |
Construction of new PCC drain with cover slab from Arun Mondal house to Ashish Mondal house at Joy1 |
Completion of work |
-
latitude : 24.195448333333335,24.195448333333335,24.195448333333335
Longitude : 87.954545,87.954545,87.954545
file name : Image_15072022105538047.png
|
2022-07-15 10:55:38.128181 |
93 |
46683865 |
Sinking a new tubewell mark II with platform soakpit and drain near Dulal Chokroborty house at Chand |
60000 |
Sinking a new tubewell mark II with platform soakpit and drain near Dulal Chokroborty house at Chand1 |
Completion of work |
-
latitude : 24.19134
Longitude : 87.91179333333334
file name : Image_15072022123756965.png
|
2022-07-15 12:37:57.048843 |
94 |
46683865 |
Sinking a new tubewell mark II with platform soakpit and drain near Dulal Chokroborty house at Chand |
60000 |
Sinking a new tubewell mark II with platform soakpit and drain near Dulal Chokroborty house at Chand1 |
Completion of work |
-
latitude : 24.191346666666664
Longitude : 87.91179666666667
file name : Image_15072022124156859.png
|
2022-07-15 12:41:56.943944 |
95 |
46685401 |
Sinking a new tubewell with platform soakpit and drain near Panchkori house at Dunigram paschim |
60000 |
Sinking a new tubewell with platform soakpit and drain near Panchkori house at Dunigram paschim1 |
Completion of work |
-
latitude : 24.2120367
Longitude : 87.9161729
file name : Image_04082022140926755.png
|
2022-08-04 14:09:26.809812 |
96 |
47242797 |
Construction of new PCC roadfrom Kamra Durga Mandir to Tarun Dului house at Kamra |
250000 |
Construction of new PCC roadfrom Kamra Durga Mandir to Tarun Dului house at Kamra1 |
Plinth level |
-
latitude : 24.18082666666667,24.18082666666667,24.18082666666667
Longitude : 87.92363333333333,87.92363333333333,87.92363333333333
file name : Image_05082022140613839.png
|
2022-08-05 14:06:13.923046 |
97 |
47242797 |
Construction of new PCC roadfrom Kamra Durga Mandir to Tarun Dului house at Kamra |
250000 |
Construction of new PCC roadfrom Kamra Durga Mandir to Tarun Dului house at Kamra1 |
Completion of work |
-
latitude : 24.18084666666667,24.18084666666667,24.180844999999998
Longitude : 87.92367833333334,87.92367833333334,87.92368
file name : Image_15072022112221020.png
|
2022-07-15 11:22:21.081356 |
98 |
46654046 |
Sinking a new tubewell with platform soakpit and drain near Rani Bazar at Gopalpur |
60000 |
Sinking a new tubewell with platform soakpit and drain near Rani Bazar at Gopalpur1 |
Completion of work |
-
latitude : 24.1991435
Longitude : 87.952884
file name : Image_08082022105651073.png
|
2022-08-08 10:56:51.195999 |
99 |
46654046 |
Sinking a new tubewell with platform soakpit and drain near Rani Bazar at Gopalpur |
60000 |
Sinking a new tubewell with platform soakpit and drain near Rani Bazar at Gopalpur1 |
Completion of work |
-
latitude : 24.1991435
Longitude : 87.952884
file name : Image_08082022105641112.png
|
2022-08-08 10:56:41.233942 |
100 |
46683689 |
Sinking a new tubewell mark II with platform soakpit and drain near Milon Marjit tea shop at Chandpa |
60000 |
Sinking a new tubewell mark II with platform soakpit and drain near Milon Marjit tea shop at Chandpa1 |
Completion of work |
-
latitude : 24.2120367
Longitude : 87.9161753
file name : Image_08082022130459237.png
|
2022-08-08 13:04:59.332918 |
101 |
56879391 |
Installation of pump with distribution pipeline in water storage Tank near Santosh Mondal at shilgra |
175000 |
Installation of pump with distribution pipeline in water storage Tank near Santosh Mondal at shilgra1 |
Plinth level |
-
latitude : 24.19702666666667
Longitude : 87.91641999999999
file name : Image_26052023111840740.png
|
2023-05-26 11:18:40.848735 |
102 |
56879391 |
Installation of pump with distribution pipeline in water storage Tank near Santosh Mondal at shilgra |
175000 |
Installation of pump with distribution pipeline in water storage Tank near Santosh Mondal at shilgra1 |
Completion of work |
-
latitude : 24.19738166666667
Longitude : 87.91656166666668
file name : Image_13052023103209433.png
|
2023-05-13 10:32:09.508301 |
103 |
46654146 |
Sinking a new mark 2 tubewell with platform soakpit and drain near Laxmitala paschimpara at Gopalpur |
60000 |
Sinking a new mark 2 tubewell with platform soakpit and drain near Laxmitala paschimpara at Gopalpur1 |
Roof laid |
-
latitude : 24.1991415
Longitude : 87.9531475
file name : Image_29122022101708654.png
|
2022-12-29 10:17:08.710711 |
104 |
46654146 |
Sinking a new mark 2 tubewell with platform soakpit and drain near Laxmitala paschimpara at Gopalpur |
60000 |
Sinking a new mark 2 tubewell with platform soakpit and drain near Laxmitala paschimpara at Gopalpur1 |
Plinth level |
-
latitude : 24.1991415
Longitude : 87.9531481
file name : Image_29122022101425936.png
|
2022-12-29 10:14:25.993193 |
105 |
46654146 |
Sinking a new mark 2 tubewell with platform soakpit and drain near Laxmitala paschimpara at Gopalpur |
60000 |
Sinking a new mark 2 tubewell with platform soakpit and drain near Laxmitala paschimpara at Gopalpur1 |
Completion of work |
-
latitude : 24.1991436
Longitude : 87.9528844
file name : Image_08082022110202313.png
|
2022-08-08 11:02:02.405225 |
106 |
46682987 |
Construction of new PCC drain with cover slab from Samim Ali house to Santi sk House at Shilgram |
120000 |
Construction of new PCC drain with cover slab from Samim Ali house to Santi sk House at Shilgram1 |
Completion of work |
-
latitude : 24.195496666666667,24.19541166666667,24.19541166666667,24.195455
Longitude : 87.91664666666665,87.91686666666668,87.91686666666668,87.91674833333333
file name : Image_14072022164734923.png
|
2022-07-14 16:47:35.040068 |
107 |
46684668 |
Sinking a new tubewell mark II with platform soakpit and drain near Sufal mal house at kamra |
60000 |
Sinking a new tubewell mark II with platform soakpit and drain near Sufal mal house at kamra1 |
Completion of work |
-
latitude : 24.180394999999997
Longitude : 87.92282666666667
file name : Image_30122022132639361.png
|
2022-12-30 13:26:39.428059 |
108 |
39105327 |
Sinking a newmark II tubewell with platform and saokpit near Golam nobi house at Koyemba |
80000 |
Sinking a newmark II tubewell with platform and saokpit near Golam nobi house at Koyemba1 |
Completion of work |
-
latitude : 24.17307333333333
Longitude : 87.90858166666666
file name : Image_24092021110315711.png
|
2021-09-24 11:03:15.763389 |
109 |
39105327 |
Sinking a newmark II tubewell with platform and saokpit near Golam nobi house at Koyemba |
80000 |
Sinking a newmark II tubewell with platform and saokpit near Golam nobi house at Koyemba1 |
Plinth level |
-
latitude : 24.17314666666667
Longitude : 87.90856000000001
file name : Image_24092021110410905.png
|
2021-09-24 11:04:10.956412 |
110 |
39105327 |
Sinking a newmark II tubewell with platform and saokpit near Golam nobi house at Koyemba |
80000 |
Sinking a newmark II tubewell with platform and saokpit near Golam nobi house at Koyemba1 |
Roof laid |
-
latitude : 24.173156666666667
Longitude : 87.90857666666668
file name : Image_24092021110547260.png
|
2021-09-24 11:05:47.317079 |
111 |
67230564 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.2120642
Longitude : 87.9161766
file name : Image_29082024130510246.png
|
2024-08-29 13:05:10.37338 |
112 |
67230564 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.2120934
Longitude : 87.9161099
file name : Image_29082024130332716.png
|
2024-08-29 13:03:32.840406 |
113 |
67230564 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 24.2120688
Longitude : 87.9161781
file name : Image_29082024125917686.png
|
2024-08-29 12:59:18.55023 |
114 |
34781583 |
Maintanance of culvert with PCC near house of Arun at silogram |
50000 |
Maintanance of culvert with PCC near house of Arun at silogram1 |
Plinth level |
-
latitude : 24.212141,24.2121411
Longitude : 87.9161673,87.9161701
file name : Image_28092021154030633.png
|
2021-09-28 15:40:30.700395 |
115 |
34781583 |
Maintanance of culvert with PCC near house of Arun at silogram |
50000 |
Maintanance of culvert with PCC near house of Arun at silogram1 |
Roof laid |
-
latitude : 24.2121397,24.2121349
Longitude : 87.9161697,87.9161691
file name : Image_28092021154159694.png
|
2021-09-28 15:41:59.759157 |
116 |
34781583 |
Maintanance of culvert with PCC near house of Arun at silogram |
50000 |
Maintanance of culvert with PCC near house of Arun at silogram1 |
Completion of work |
-
latitude : 24.2121373,24.2121335
Longitude : 87.9161686,87.9161737
file name : Image_28092021153751416.png
|
2021-09-28 15:37:51.480709 |
117 |
39105372 |
Sinking a newmark II tubewell with platform and saokpit near Kalu kha house at Koyemba |
80000 |
Sinking a newmark II tubewell with platform and saokpit near Kalu kha house at Koyemba1 |
Completion of work |
-
latitude : 24.17312
Longitude : 87.90926833333333
file name : Image_24092021110732429.png
|
2021-09-24 11:07:32.484717 |
118 |
39105372 |
Sinking a newmark II tubewell with platform and saokpit near Kalu kha house at Koyemba |
80000 |
Sinking a newmark II tubewell with platform and saokpit near Kalu kha house at Koyemba1 |
Plinth level |
-
latitude : 24.17314666666667
Longitude : 87.90929333333334
file name : Image_24092021110925859.png
|
2021-09-24 11:09:25.917171 |
119 |
39105372 |
Sinking a newmark II tubewell with platform and saokpit near Kalu kha house at Koyemba |
80000 |
Sinking a newmark II tubewell with platform and saokpit near Kalu kha house at Koyemba1 |
Plinth level |
-
latitude : 24.173144999999998
Longitude : 87.90930000000002
file name : Image_24092021111053255.png
|
2021-09-24 11:10:53.325262 |
120 |
56880472 |
Installation of pump with distribution pipeline water Tank near santi para bele pond miiyapara |
250000 |
Installation of pump with distribution pipeline water Tank near santi para bele pond miiyapara1 |
Completion of work |
-
latitude : 24.1991474
Longitude : 87.9531522
file name : Image_15032023103244905.png
|
2023-03-15 10:32:44.982959 |
121 |
39106145 |
Maintanance of Community toilet near Girls school at chandpara |
230000 |
Maintanance of Community toilet near Girls school at chandpara1 |
Completion of work |
-
latitude : 24.187911666666665
Longitude : 87.91168
file name : Image_14122021144324440.png
|
2021-12-14 14:43:24.507122 |
122 |
39106145 |
Maintanance of Community toilet near Girls school at chandpara |
230000 |
Maintanance of Community toilet near Girls school at chandpara1 |
Plinth level |
-
latitude : 24.18795
Longitude : 87.91167333333333
file name : Image_14122021144617506.png
|
2021-12-14 14:46:17.579806 |
123 |
39106145 |
Maintanance of Community toilet near Girls school at chandpara |
230000 |
Maintanance of Community toilet near Girls school at chandpara1 |
Roof laid |
-
latitude : 24.187953333333333
Longitude : 87.91169333333333
file name : Image_14122021144754444.png
|
2021-12-14 14:47:54.510711 |
124 |
34820500 |
Maintanance of road side protection wall with PCC at Panja pond north side at Chandpara |
200000 |
Maintanance of road side protection wall with PCC at Panja pond north side at Chandpara1 |
Completion of work |
-
latitude : 24.19399166666667,24.193998333333337,24.194
Longitude : 87.91055833333333,87.91055666666668,87.91055499999999
file name : Image_14122021151019582.png
|
2021-12-14 15:10:19.655464 |
125 |
34820500 |
Maintanance of road side protection wall with PCC at Panja pond north side at Chandpara |
200000 |
Maintanance of road side protection wall with PCC at Panja pond north side at Chandpara1 |
Plinth level |
-
latitude : 24.194040000000005,24.194035
Longitude : 87.91055833333333,87.91055833333333
file name : Image_14122021151338695.png
|
2021-12-14 15:13:38.756892 |
126 |
34820500 |
Maintanance of road side protection wall with PCC at Panja pond north side at Chandpara |
200000 |
Maintanance of road side protection wall with PCC at Panja pond north side at Chandpara1 |
Roof laid |
-
latitude : 24.194056666666665,24.19404666666667
Longitude : 87.91052666666668,87.91053500000001
file name : Image_14122021151532544.png
|
2021-12-14 15:15:32.595646 |
127 |
47246456 |
Construction of new protection toe wall with Bolder at Panja pond at Chandpara |
280000 |
Construction of new protection toe wall with Bolder at Panja pond at Chandpara1 |
Completion of work |
-
latitude : 24.19404833333333,24.19404833333333
Longitude : 87.91063666666666,87.91063666666666
file name : Image_21122021141639710.png
|
2021-12-21 14:16:39.766799 |
128 |
47246456 |
Construction of new protection toe wall with Bolder at Panja pond at Chandpara |
280000 |
Construction of new protection toe wall with Bolder at Panja pond at Chandpara1 |
Plinth level |
-
latitude : 24.194031666666667,24.194031666666667
Longitude : 87.91061166666665,87.91061166666665
file name : Image_21122021141744064.png
|
2021-12-21 14:17:44.12356 |
129 |
39105394 |
Sinking a newmark II tubewell with platform and saokpit near Gopal mal house at Koyemba |
80000 |
Sinking a newmark II tubewell with platform and saokpit near Gopal mal house at Koyemba1 |
Completion of work |
-
latitude : 24.17576
Longitude : 87.90649166666665
file name : Image_24092021104605166.png
|
2021-09-24 10:46:05.253983 |
130 |
39105394 |
Sinking a newmark II tubewell with platform and saokpit near Gopal mal house at Koyemba |
80000 |
Sinking a newmark II tubewell with platform and saokpit near Gopal mal house at Koyemba1 |
Plinth level |
-
latitude : 24.175774999999998
Longitude : 87.90642833333335
file name : Image_24092021104843420.png
|
2021-09-24 10:48:43.486137 |
131 |
39105394 |
Sinking a newmark II tubewell with platform and saokpit near Gopal mal house at Koyemba |
80000 |
Sinking a newmark II tubewell with platform and saokpit near Gopal mal house at Koyemba1 |
Roof laid |
-
latitude : 24.17568833333333
Longitude : 87.90637999999998
file name : Image_24092021105008578.png
|
2021-09-24 10:50:08.653243 |
132 |
39105394 |
Sinking a newmark II tubewell with platform and saokpit near Gopal mal house at Koyemba |
80000 |
Sinking a newmark II tubewell with platform and saokpit near Gopal mal house at Koyemba1 |
Completion of work |
-
latitude : 24.175698333333337
Longitude : 87.90641833333332
file name : Image_27082021141450517.png
|
2021-08-27 14:14:50.584199 |
133 |
39105512 |
Sinking of submersible pump with pipe line Sentu house at Dunigram paschim |
240000 |
Sinking of submersible pump with pipe line Sentu house at Dunigram paschim1 |
Completion of work |
-
latitude : 24.210721666666668
Longitude : 87.91646999999999
file name : Image_28092021101001566.png
|
2021-09-28 10:10:01.641088 |
134 |
39105512 |
Sinking of submersible pump with pipe line Sentu house at Dunigram paschim |
240000 |
Sinking of submersible pump with pipe line Sentu house at Dunigram paschim1 |
Plinth level |
-
latitude : 24.21070666666667
Longitude : 87.91647499999999
file name : Image_28092021101212203.png
|
2021-09-28 10:12:12.269396 |
135 |
39105512 |
Sinking of submersible pump with pipe line Sentu house at Dunigram paschim |
240000 |
Sinking of submersible pump with pipe line Sentu house at Dunigram paschim1 |
Roof laid |
-
latitude : 24.210696666666664
Longitude : 87.91648833333332
file name : Image_28092021101328192.png
|
2021-09-28 10:13:28.248533 |
136 |
34860452 |
Maintanance of road with PCC from Idd gaha to Monoara house at Kabirajpur |
200000 |
Maintanance of road with PCC from Idd gaha to Monoara house at Kabirajpur1 |
Completion of work |
-
latitude : 24.208626666666667,24.208624999999998,24.208724999999998,24.208803333333336
Longitude : 87.92496333333332,87.92495833333332,87.92474833333333,87.92453833333333
file name : Image_08082021101601111.png
|
2021-08-08 10:16:01.173957 |
137 |
39105353 |
Sinking a newmark II tubewell with platform and saokpit near Montu kha house at Koyemba |
80000 |
Sinking a newmark II tubewell with platform and saokpit near Montu kha house at Koyemba1 |
Completion of work |
-
latitude : 24.17259
Longitude : 87.90791499999999
file name : Image_24092021105600671.png
|
2021-09-24 10:56:00.745719 |
138 |
39105353 |
Sinking a newmark II tubewell with platform and saokpit near Montu kha house at Koyemba |
80000 |
Sinking a newmark II tubewell with platform and saokpit near Montu kha house at Koyemba1 |
Plinth level |
-
latitude : 24.172635
Longitude : 87.90789166666667
file name : Image_24092021105720515.png
|
2021-09-24 10:57:20.590103 |
139 |
39105353 |
Sinking a newmark II tubewell with platform and saokpit near Montu kha house at Koyemba |
80000 |
Sinking a newmark II tubewell with platform and saokpit near Montu kha house at Koyemba1 |
Plinth level |
-
latitude : 24.172596666666664
Longitude : 87.90790666666665
file name : Image_24092021105822660.png
|
2021-09-24 10:58:22.739204 |
140 |
34816961 |
Maintanance of Road protection wall with PCC Maharani pond eastb side at Silogram |
150000 |
Maintanance of Road protection wall with PCC Maharani pond eastb side at Silogram1 |
Completion of work |
-
latitude : 24.198892791755497,24.198767943307757
Longitude : 87.91997683234513,87.91979427449405
file name : Image_10012021121844347.png
|
2021-01-10 12:18:44.417436 |
141 |
34816961 |
Maintanance of Road protection wall with PCC Maharani pond eastb side at Silogram |
150000 |
Maintanance of Road protection wall with PCC Maharani pond eastb side at Silogram1 |
Completion of work |
-
latitude : 24.198679639957845,24.19880687724799
Longitude : 87.91952848434448,87.91987339965999
file name : Image_27012021101038607.png
|
2021-01-27 10:10:38.679465 |
142 |
34816961 |
Maintanance of Road protection wall with PCC Maharani pond eastb side at Silogram |
150000 |
Maintanance of Road protection wall with PCC Maharani pond eastb side at Silogram1 |
Completion of work |
-
latitude : 24.198679639957845,24.19880687724799
Longitude : 87.91952848434448,87.91987339965999
file name : Image_27012021101218114.png
|
2021-01-27 10:12:18.181363 |
143 |
34816961 |
Maintanance of Road protection wall with PCC Maharani pond eastb side at Silogram |
150000 |
Maintanance of Road protection wall with PCC Maharani pond eastb side at Silogram1 |
Roof laid |
-
latitude : 24.198891576379538,24.198794849216938,24.19871823862195
Longitude : 87.91997222229838,87.91986040771008,87.91973476298153
file name : Image_27012021115428572.png
|
2021-01-27 11:54:28.654399 |
144 |
34821903 |
Maintanance of Road with PCC from Subtara das house to Cenema hall at chandpara |
250000 |
Maintanance of Road with PCC from Subtara das house to Cenema hall at chandpara1 |
Plinth level |
-
latitude : 24.186764345504344,24.186690752394497,24.186667031608522
Longitude : 87.91188125498593,87.91192760691047,87.91194655001163
file name : Image_27012021101109664.png
|
2021-01-27 10:11:09.732978 |
145 |
34821903 |
Maintanance of Road with PCC from Subtara das house to Cenema hall at chandpara |
250000 |
Maintanance of Road with PCC from Subtara das house to Cenema hall at chandpara1 |
Roof laid |
-
latitude : 24.186736475676298,24.18679623864591,24.18682741932571
Longitude : 87.91192676872015,87.91188829578459,87.91185426525772
file name : Image_27012021121442264.png
|
2021-01-27 12:14:42.335325 |
146 |
34821903 |
Maintanance of Road with PCC from Subtara das house to Cenema hall at chandpara |
250000 |
Maintanance of Road with PCC from Subtara das house to Cenema hall at chandpara1 |
Roof laid |
-
latitude : 24.186736475676298,24.18679623864591,24.18682741932571
Longitude : 87.91192676872015,87.91188829578459,87.91185426525772
file name : Image_27012021121447955.png
|
2021-01-27 12:14:48.037272 |
147 |
34821903 |
Maintanance of Road with PCC from Subtara das house to Cenema hall at chandpara |
250000 |
Maintanance of Road with PCC from Subtara das house to Cenema hall at chandpara1 |
Completion of work |
-
latitude : 24.186539794318378,24.186464021913707
Longitude : 87.9119895491749,87.91205341927707
file name : Image_09012021111915294.png
|
2021-01-09 11:19:15.359719 |
148 |
34777394 |
Maintanance of road with PCC from Nitai mal house to milon sk house at Madhupur |
150000 |
Maintanance of road with PCC from Nitai mal house to milon sk house at Madhupur1 |
Completion of work |
-
latitude : 24.206117070280015,24.206079309806228
Longitude : 87.93460367247462,87.93459998443723
file name : Image_10012021133243815.png
|
2021-01-10 13:32:43.911622 |
149 |
34777394 |
Maintanance of road with PCC from Nitai mal house to milon sk house at Madhupur |
150000 |
Maintanance of road with PCC from Nitai mal house to milon sk house at Madhupur1 |
Completion of work |
-
latitude : 24.205977134406567,24.205948216840625
Longitude : 87.93463393114507,87.93462999165058
file name : Image_27012021111514494.png
|
2021-01-27 11:15:14.554343 |
150 |
34777394 |
Maintanance of road with PCC from Nitai mal house to milon sk house at Madhupur |
150000 |
Maintanance of road with PCC from Nitai mal house to milon sk house at Madhupur1 |
Plinth level |
-
latitude : 24.20592814218253,24.205945366993546
Longitude : 87.93462705798447,87.93462789617479
file name : Image_27012021112056887.png
|
2021-01-27 11:20:56.953276 |
151 |
34777394 |
Maintanance of road with PCC from Nitai mal house to milon sk house at Madhupur |
150000 |
Maintanance of road with PCC from Nitai mal house to milon sk house at Madhupur1 |
Roof laid |
-
latitude : 24.2062779,24.2062779
Longitude : 87.9345937,87.9345937
file name : Image_27012021112343895.png
|
2021-01-27 11:23:43.956412 |
152 |
34825230 |
Maintanance of Road with PCC from Hasur sk house to School at Harirampur |
260000 |
Maintanance of Road with PCC from Hasur sk house to School at Harirampur1 |
Completion of work |
-
latitude : 24.171402077190578,24.171631867066026,24.171657892875373
Longitude : 87.90959022939205,87.90929242037237,87.90918764658272
file name : Image_11012021132923636.png
|
2021-01-11 13:29:23.717958 |
153 |
34825230 |
Maintanance of Road with PCC from Hasur sk house to School at Harirampur |
260000 |
Maintanance of Road with PCC from Hasur sk house to School at Harirampur1 |
Plinth level |
-
latitude : 24.2119708,24.17142177466303
Longitude : 87.9212903,87.90956541895866
file name : Image_24012021123532481.png
|
2021-01-24 12:35:32.553563 |
154 |
34825230 |
Maintanance of Road with PCC from Hasur sk house to School at Harirampur |
260000 |
Maintanance of Road with PCC from Hasur sk house to School at Harirampur1 |
Roof laid |
-
latitude : 24.171393737196922,24.171595028601587,24.171627005562186
Longitude : 87.9095792490989,87.90944522246718,87.90922083891928
file name : Image_27012021121434675.png
|
2021-01-27 12:14:34.746071 |
155 |
34859886 |
Maintanance of road with PCC from Main road to Tulu miya house at Miyapara |
100000 |
Maintanance of road with PCC from Main road to Tulu miya house at Miyapara1 |
Completion of work |
-
latitude : 24.212129535153508,24.21217098366469,24.212174294516444
Longitude : 87.91978698223829,87.91975999251008,87.91977608576417
file name : Image_29012021123049804.png
|
2021-01-29 12:30:49.904222 |
156 |
34859886 |
Maintanance of road with PCC from Main road to Tulu miya house at Miyapara |
100000 |
Maintanance of road with PCC from Main road to Tulu miya house at Miyapara1 |
Plinth level |
-
latitude : 24.212186699733138,24.21218162868172
Longitude : 87.91978999972343,87.91978371329606
file name : Image_29012021123323429.png
|
2021-01-29 12:33:23.510613 |
157 |
34859886 |
Maintanance of road with PCC from Main road to Tulu miya house at Miyapara |
100000 |
Maintanance of road with PCC from Main road to Tulu miya house at Miyapara1 |
Roof laid |
-
latitude : 24.21212345827371,24.212170313112438,24.212195961736143
Longitude : 87.91982470080256,87.91978505440056,87.91979067027569
file name : Image_29012021123445012.png
|
2021-01-29 12:34:45.091042 |
158 |
34852826 |
Maintanance of Road with PCC from Apel sk house to Bidhyanath dham house at Chhotochowki |
150000 |
Maintanance of Road with PCC from Apel sk house to Bidhyanath dham house at Chhotochowki1 |
Plinth level |
-
latitude : 24.206015188246965,24.21318707987666
Longitude : 87.93463703244925,87.91429767385125
file name : Image_27012021114159869.png
|
2021-01-27 11:41:59.941322 |
159 |
34852826 |
Maintanance of Road with PCC from Apel sk house to Bidhyanath dham house at Chhotochowki |
150000 |
Maintanance of Road with PCC from Apel sk house to Bidhyanath dham house at Chhotochowki1 |
Roof laid |
-
latitude : 24.21312660444528,24.213199065998197,24.213227480649948
Longitude : 87.91436799801886,87.91416331194341,87.9140742123127
file name : Image_27012021114431561.png
|
2021-01-27 11:44:31.639723 |
160 |
34852826 |
Maintanance of Road with PCC from Apel sk house to Bidhyanath dham house at Chhotochowki |
150000 |
Maintanance of Road with PCC from Apel sk house to Bidhyanath dham house at Chhotochowki1 |
Completion of work |
-
latitude : 24.213165496475995,24.213219308294356,24.213290344923735
Longitude : 87.91427764110267,87.91409701108932,87.91393591091037
file name : Image_10012021113354961.png
|
2021-01-10 11:33:55.041914 |
161 |
39105617 |
Sinking of submersible pump with pipe line near Rahul house at Kabirajpur |
240000 |
Sinking of submersible pump with pipe line near Rahul house at Kabirajpur1 |
Plinth level |
-
latitude : 24.21101
Longitude : 87.93048166666668
file name : Image_03092021121009639.png
|
2021-09-03 12:10:09.696301 |
162 |
39105617 |
Sinking of submersible pump with pipe line near Rahul house at Kabirajpur |
240000 |
Sinking of submersible pump with pipe line near Rahul house at Kabirajpur1 |
Roof laid |
-
latitude : 24.21099333333333
Longitude : 87.9305
file name : Image_03092021121228791.png
|
2021-09-03 12:12:28.849917 |
163 |
39105617 |
Sinking of submersible pump with pipe line near Rahul house at Kabirajpur |
240000 |
Sinking of submersible pump with pipe line near Rahul house at Kabirajpur1 |
Completion of work |
-
latitude : 24.211073333333335
Longitude : 87.93046833333334
file name : Image_03092021120237138.png
|
2021-09-03 12:02:37.189789 |
164 |
39105617 |
Sinking of submersible pump with pipe line near Rahul house at Kabirajpur |
240000 |
Sinking of submersible pump with pipe line near Rahul house at Kabirajpur1 |
Completion of work |
-
latitude : 24.21109666666667
Longitude : 87.93051166666667
file name : Image_03092021120115950.png
|
2021-09-03 12:01:16.016294 |
165 |
34822534 |
Maintanance of Road with PCC from Nupur chandra mondal house to susil das house at chandpara |
150000 |
Maintanance of Road with PCC from Nupur chandra mondal house to susil das house at chandpara1 |
Roof laid |
-
latitude : 24.19007,24.190054999999997,24.190048333333333,24.19004,24.190016666666665,24.190016666666665,24.189989999999998,24.189968333333333,24.189943333333336
Longitude : 87.91146666666667,87.91152333333334,87.91155333333333,87.91159,87.91168,87.91168,87.911775,87.91186166666667,87.91194833333333
file name : Image_03092021163326903.png
|
2021-09-03 16:33:26.964939 |
166 |
34822534 |
Maintanance of Road with PCC from Nupur chandra mondal house to susil das house at chandpara |
150000 |
Maintanance of Road with PCC from Nupur chandra mondal house to susil das house at chandpara1 |
Completion of work |
-
latitude : 24.189854999999998,24.189929999999997,24.189946666666668,24.189973333333334,24.189941666666662,24.189941666666662,24.189963333333335,24.189970000000002,24.189970000000002,24.189973333333334
Longitude : 87.91211999999999,87.91225333333333,87.91226999999999,87.91227833333332,87.912205,87.912205,87.91208833333333,87.91207333333332,87.91207333333332,87.91206166666667
file name : Image_23082021141040951.png
|
2021-08-23 14:10:41.023373 |
167 |
34822534 |
Maintanance of Road with PCC from Nupur chandra mondal house to susil das house at chandpara |
150000 |
Maintanance of Road with PCC from Nupur chandra mondal house to susil das house at chandpara1 |
Completion of work |
-
latitude : 24.189933333333336,24.189933333333336,24.189933333333336
Longitude : 87.91212833333333,87.91212833333333,87.91212833333333
file name : Image_08082021125428868.png
|
2021-08-08 12:54:28.946549 |
168 |
39106188 |
Maintanance of Community toilet near Dunigram hattala at dunigram Miyapara |
230702 |
Maintanance of Community toilet near Dunigram hattala at dunigram Miyapara1 |
Completion of work |
-
latitude : 24.211593333333333
Longitude : 87.91830833333333
file name : Image_14122021152559483.png
|
2021-12-14 15:25:59.546315 |
169 |
39106188 |
Maintanance of Community toilet near Dunigram hattala at dunigram Miyapara |
230702 |
Maintanance of Community toilet near Dunigram hattala at dunigram Miyapara1 |
Plinth level |
-
latitude : 24.211908
Longitude : 87.9182571
file name : Image_14122021152810264.png
|
2021-12-14 15:28:10.326065 |
170 |
39106188 |
Maintanance of Community toilet near Dunigram hattala at dunigram Miyapara |
230702 |
Maintanance of Community toilet near Dunigram hattala at dunigram Miyapara1 |
Roof laid |
-
latitude : 24.2116054
Longitude : 87.9184322
file name : Image_14122021152931849.png
|
2021-12-14 15:29:31.913751 |
171 |
39106556 |
Maint drain inc soakpit cover PCC Ajed house to tuktuk house via sabader house at jhitkepara |
210000 |
Maint drain inc soakpit cover PCC Ajed house to tuktuk house via sabader house at jhitkepara1 |
Plinth level |
-
latitude : 24.212455465458333,24.212569962255657,24.21261354815215,24.212661157362163
Longitude : 87.91902816854417,87.9190459381789,87.91904786601663,87.91904862038791
file name : Image_23032021123244020.png
|
2021-03-23 12:32:44.093089 |
172 |
39106556 |
Maint drain inc soakpit cover PCC Ajed house to tuktuk house via sabader house at jhitkepara |
210000 |
Maint drain inc soakpit cover PCC Ajed house to tuktuk house via sabader house at jhitkepara1 |
Roof laid |
-
latitude : 24.212924810126424,24.212917811237276,24.212814210914075,24.21266484539956,24.21261040493846,24.212524532340467
Longitude : 87.9189095646143,87.9190596845001,87.9191077966243,87.91910335421562,87.91910544969141,87.91909371502697
file name : Image_23032021134334403.png
|
2021-03-23 13:43:34.501742 |
173 |
39106556 |
Maint drain inc soakpit cover PCC Ajed house to tuktuk house via sabader house at jhitkepara |
210000 |
Maint drain inc soakpit cover PCC Ajed house to tuktuk house via sabader house at jhitkepara1 |
Roof laid |
-
latitude : 24.212924810126424,24.212917811237276,24.212814210914075,24.21266484539956,24.21261040493846,24.212524532340467
Longitude : 87.9189095646143,87.9190596845001,87.9191077966243,87.91910335421562,87.91910544969141,87.91909371502697
file name : Image_23032021134338469.png
|
2021-03-23 13:43:38.564265 |
174 |
39106556 |
Maint drain inc soakpit cover PCC Ajed house to tuktuk house via sabader house at jhitkepara |
210000 |
Maint drain inc soakpit cover PCC Ajed house to tuktuk house via sabader house at jhitkepara1 |
Completion of work |
-
latitude : 24.21262658201158,24.212631275877357
Longitude : 87.91906387545168,87.91907787322998
file name : Image_25022021084212589.png
|
2021-02-25 08:42:12.667466 |
175 |
39106536 |
Maint drain inc soakpit cover PCC Sukhen saha house to Sadhan sutradhar house at kayemba |
100000 |
Maint drain inc soakpit cover PCC Sukhen saha house to Sadhan sutradhar house at kayemba1 |
Plinth level |
-
latitude : 24.17420226149261,24.174196729436517,24.174141534604132
Longitude : 87.90618047118187,87.90615641511977,87.9061514697969
file name : Image_23032021104352986.png
|
2021-03-23 10:43:53.0596 |
176 |
39106536 |
Maint drain inc soakpit cover PCC Sukhen saha house to Sadhan sutradhar house at kayemba |
100000 |
Maint drain inc soakpit cover PCC Sukhen saha house to Sadhan sutradhar house at kayemba1 |
Roof laid |
-
latitude : 24.17420247104019,24.17414337862283,24.1742831049487
Longitude : 87.90620913729072,87.90618038736284,87.90615641511977
file name : Image_23032021105426623.png
|
2021-03-23 10:54:26.703347 |
177 |
39106536 |
Maint drain inc soakpit cover PCC Sukhen saha house to Sadhan sutradhar house at kayemba |
100000 |
Maint drain inc soakpit cover PCC Sukhen saha house to Sadhan sutradhar house at kayemba1 |
Completion of work |
-
latitude : 24.174224347807467,24.17420720681548
Longitude : 87.90611735545099,87.90614375844598
file name : Image_25022021091038915.png
|
2021-02-25 09:10:38.973108 |
178 |
56878822 |
Installation of pump with distribution pipeline in/c water storage Tank at near Simultala at Balsa |
250000 |
Installation of pump with distribution pipeline in/c water storage Tank at near Simultala at Balsa1 |
Plinth level |
-
latitude : 24.219113333333333
Longitude : 87.94402166666666
file name : Image_24032023122228357.png
|
2023-03-24 12:22:28.490568 |
179 |
56878822 |
Installation of pump with distribution pipeline in/c water storage Tank at near Simultala at Balsa |
250000 |
Installation of pump with distribution pipeline in/c water storage Tank at near Simultala at Balsa1 |
Plinth level |
-
latitude : 24.2120613
Longitude : 87.916176
file name : Image_20032023092555877.png
|
2023-03-20 09:25:55.944275 |
180 |
56878822 |
Installation of pump with distribution pipeline in/c water storage Tank at near Simultala at Balsa |
250000 |
Installation of pump with distribution pipeline in/c water storage Tank at near Simultala at Balsa1 |
Completion of work |
-
latitude : 24.1991474
Longitude : 87.9531522
file name : Image_15032023103241329.png
|
2023-03-15 10:32:41.408813 |
181 |
56878099 |
Installation of pump with distribution pipeline in/c water storage Tank at Namupara gopalpur |
250000 |
Installation of pump with distribution pipeline in/c water storage Tank at Namupara gopalpur1 |
Plinth level |
-
latitude : 24.200041666666667
Longitude : 87.95587166666668
file name : Image_09042023180545444.png
|
2023-04-09 18:05:45.504304 |
182 |
56878099 |
Installation of pump with distribution pipeline in/c water storage Tank at Namupara gopalpur |
250000 |
Installation of pump with distribution pipeline in/c water storage Tank at Namupara gopalpur1 |
Completion of work |
-
latitude : 24.20009394
Longitude : 87.95587258
file name : Image_15032023103219565.png
|
2023-03-15 10:32:19.662137 |
183 |
34781948 |
Maintanance of Road with PCC from Anil mal house to Nitai chandra majhi land at silogram |
150000 |
Maintanance of Road with PCC from Anil mal house to Nitai chandra majhi land at silogram1 |
Roof laid |
-
latitude : 24.197760000000002,24.197760000000002
Longitude : 87.91661,87.91660833333331
file name : Image_03092021165510662.png
|
2021-09-03 16:55:10.731163 |
184 |
34781948 |
Maintanance of Road with PCC from Anil mal house to Nitai chandra majhi land at silogram |
150000 |
Maintanance of Road with PCC from Anil mal house to Nitai chandra majhi land at silogram1 |
Plinth level |
-
latitude : 24.19775666666667,24.19774333333333,24.19774333333333
Longitude : 87.91664999999999,87.91663500000001,87.91663833333332
file name : Image_13082021151129498.png
|
2021-08-13 15:11:29.589894 |
185 |
34781948 |
Maintanance of Road with PCC from Anil mal house to Nitai chandra majhi land at silogram |
150000 |
Maintanance of Road with PCC from Anil mal house to Nitai chandra majhi land at silogram1 |
Completion of work |
-
latitude : 24.19783,24.197835,24.197898333333335,24.197963333333337
Longitude : 87.91659999999999,87.91660166666666,87.91661333333334,87.91665333333334
file name : Image_08082021105830295.png
|
2021-08-08 10:58:30.38738 |
186 |
39105454 |
Sinking of submersible pump with pipe line near masjid at Chotochowki. |
240000 |
Sinking of submersible pump with pipe line near masjid at Chotochowki.1 |
Completion of work |
-
latitude : 24.21552166666667
Longitude : 87.91374166666668
file name : Image_23092021112109990.png
|
2021-09-23 11:21:10.05286 |
187 |
39105454 |
Sinking of submersible pump with pipe line near masjid at Chotochowki. |
240000 |
Sinking of submersible pump with pipe line near masjid at Chotochowki.1 |
Plinth level |
-
latitude : 24.215508333333332
Longitude : 87.91372666666666
file name : Image_23092021112245124.png
|
2021-09-23 11:22:45.193279 |
188 |
39105454 |
Sinking of submersible pump with pipe line near masjid at Chotochowki. |
240000 |
Sinking of submersible pump with pipe line near masjid at Chotochowki.1 |
Roof laid |
-
latitude : 24.21543166666667
Longitude : 87.91367333333334
file name : Image_23092021112554634.png
|
2021-09-23 11:25:54.715648 |
189 |
39105294 |
Sinking of submersible pump with pipe line near dheren house at Kamra |
240000 |
Sinking of submersible pump with pipe line near dheren house at Kamra1 |
Plinth level |
-
latitude : 24.18147762771696
Longitude : 87.92213114909828
file name : Image_16072021145013547.png
|
2021-07-16 14:50:13.634433 |
190 |
39105294 |
Sinking of submersible pump with pipe line near dheren house at Kamra |
240000 |
Sinking of submersible pump with pipe line near dheren house at Kamra1 |
Completion of work |
-
latitude : 24.18152150698006
Longitude : 87.92215134948492
file name : Image_26022021155019092.png
|
2021-02-26 15:50:19.1723 |
191 |
39105294 |
Sinking of submersible pump with pipe line near dheren house at Kamra |
240000 |
Sinking of submersible pump with pipe line near dheren house at Kamra1 |
Plinth level |
-
latitude : 24.181489027105272
Longitude : 87.92218387126923
file name : Image_26022021155807442.png
|
2021-02-26 15:58:07.53371 |
192 |
39105294 |
Sinking of submersible pump with pipe line near dheren house at Kamra |
240000 |
Sinking of submersible pump with pipe line near dheren house at Kamra1 |
Plinth level |
-
latitude : 24.181506671011448
Longitude : 87.92213575914502
file name : Image_26022021155822333.png
|
2021-02-26 15:58:22.425938 |
193 |
34782545 |
Maintanance of Road with PCC from Motiur rahaman house to Hasanur jaman house at silogram |
100000 |
Maintanance of Road with PCC from Motiur rahaman house to Hasanur jaman house at silogram1 |
Roof laid |
-
latitude : 24.197240000000004,24.197245,24.197286666666667,24.197288333333336
Longitude : 87.91302666666667,87.91302499999999,87.912835,87.91283333333334
file name : Image_03092021165905496.png
|
2021-09-03 16:59:05.569931 |
194 |
34782545 |
Maintanance of Road with PCC from Motiur rahaman house to Hasanur jaman house at silogram |
100000 |
Maintanance of Road with PCC from Motiur rahaman house to Hasanur jaman house at silogram1 |
Plinth level |
-
latitude : 24.197256666666664,24.197265,24.19728
Longitude : 87.91307333333334,87.91305833333332,87.913045
file name : Image_10082021120310390.png
|
2021-08-10 12:03:10.451183 |
195 |
34782545 |
Maintanance of Road with PCC from Motiur rahaman house to Hasanur jaman house at silogram |
100000 |
Maintanance of Road with PCC from Motiur rahaman house to Hasanur jaman house at silogram1 |
Completion of work |
-
latitude : 24.19728,24.197263333333332,24.197265
Longitude : 87.91299499999998,87.91301,87.91304333333333
file name : Image_08082021110141914.png
|
2021-08-08 11:01:41.966298 |
196 |
39105256 |
Sinking of submersible pump with pipe line near Masjid at Silogram |
240000 |
Sinking of submersible pump with pipe line near Masjid at Silogram1 |
Completion of work |
-
latitude : 24.195006666666668
Longitude : 87.91599833333333
file name : Image_03092021161239621.png
|
2021-09-03 16:12:39.678158 |
197 |
39105256 |
Sinking of submersible pump with pipe line near Masjid at Silogram |
240000 |
Sinking of submersible pump with pipe line near Masjid at Silogram1 |
Plinth level |
-
latitude : 24.194968333333335
Longitude : 87.91602666666668
file name : Image_03092021161455792.png
|
2021-09-03 16:14:55.85335 |
198 |
39105256 |
Sinking of submersible pump with pipe line near Masjid at Silogram |
240000 |
Sinking of submersible pump with pipe line near Masjid at Silogram1 |
Roof laid |
-
latitude : 24.194938333333333
Longitude : 87.91598833333335
file name : Image_03092021161644152.png
|
2021-09-03 16:16:44.210938 |
199 |
34782232 |
Maintanance of Road with PCC from Sontosh marjit house to Sumadish marjt house at silogram |
100000 |
Maintanance of Road with PCC from Sontosh marjit house to Sumadish marjt house at silogram1 |
Roof laid |
-
latitude : 24.198376666666665,24.19831,24.19831
Longitude : 87.91854833333333,87.91870666666667,87.91870666666667
file name : Image_03092021165505563.png
|
2021-09-03 16:55:05.650425 |
200 |
34782232 |
Maintanance of Road with PCC from Sontosh marjit house to Sumadish marjt house at silogram |
100000 |
Maintanance of Road with PCC from Sontosh marjit house to Sumadish marjt house at silogram1 |
Plinth level |
-
latitude : 24.19831166666667,24.198315,24.198315
Longitude : 87.91876833333332,87.91876666666667,87.91876666666667
file name : Image_09082021121431674.png
|
2021-08-09 12:14:31.729845 |
201 |
34782232 |
Maintanance of Road with PCC from Sontosh marjit house to Sumadish marjt house at silogram |
100000 |
Maintanance of Road with PCC from Sontosh marjit house to Sumadish marjt house at silogram1 |
Completion of work |
-
latitude : 24.198265,24.198265
Longitude : 87.91876833333332,87.91877000000001
file name : Image_08082021122503644.png
|
2021-08-08 12:25:03.718682 |
202 |
34820056 |
Maintanance of Road with PCC from Nosur house to Singi pond at chandpara |
200000 |
Maintanance of Road with PCC from Nosur house to Singi pond at chandpara1 |
Roof laid |
-
latitude : 24.194654999999997,24.19463166666667,24.194624999999995
Longitude : 87.91076166666666,87.91077333333332,87.91076833333334
file name : Image_03092021162115556.png
|
2021-09-03 16:21:15.61713 |
203 |
34820056 |
Maintanance of Road with PCC from Nosur house to Singi pond at chandpara |
200000 |
Maintanance of Road with PCC from Nosur house to Singi pond at chandpara1 |
Completion of work |
-
latitude : 24.194253333333336,24.19424333333333,24.194248333333334
Longitude : 87.91045166666666,87.91046499999999,87.91046833333333
file name : Image_08082021110556530.png
|
2021-08-08 11:05:56.583153 |
204 |
39105543 |
Sinking a new mark II tubewell with platform and saokpit near Sosti tala at Dunigram Miyapara |
80000 |
Sinking a new mark II tubewell with platform and saokpit near Sosti tala at Dunigram Miyapara1 |
Completion of work |
-
latitude : 24.21109666666667
Longitude : 87.92010833333333
file name : Image_24092021112606524.png
|
2021-09-24 11:26:06.593256 |
205 |
39105543 |
Sinking a new mark II tubewell with platform and saokpit near Sosti tala at Dunigram Miyapara |
80000 |
Sinking a new mark II tubewell with platform and saokpit near Sosti tala at Dunigram Miyapara1 |
Plinth level |
-
latitude : 24.211133333333336
Longitude : 87.92011833333332
file name : Image_24092021112721884.png
|
2021-09-24 11:27:21.94606 |
206 |
39105543 |
Sinking a new mark II tubewell with platform and saokpit near Sosti tala at Dunigram Miyapara |
80000 |
Sinking a new mark II tubewell with platform and saokpit near Sosti tala at Dunigram Miyapara1 |
Roof laid |
-
latitude : 24.211143333333332
Longitude : 87.92015166666667
file name : Image_24092021112834474.png
|
2021-09-24 11:28:34.536387 |
207 |
34817434 |
Maintanance of Road with PCC from Somir ray house to Sattyanarayan konai house at Kamra |
200000 |
Maintanance of Road with PCC from Somir ray house to Sattyanarayan konai house at Kamra1 |
Roof laid |
-
latitude : 24.18162166666667,24.18157833333333,24.181575,24.181571666666667,24.181559999999998
Longitude : 87.92378833333332,87.92373666666666,87.92368166666665,87.92364666666666,87.92353999999999
file name : Image_03092021164531026.png
|
2021-09-03 16:45:31.092893 |
208 |
34817434 |
Maintanance of Road with PCC from Somir ray house to Sattyanarayan konai house at Kamra |
200000 |
Maintanance of Road with PCC from Somir ray house to Sattyanarayan konai house at Kamra1 |
Completion of work |
-
latitude : 24.181538333333332,24.181536666666663,24.181538333333332,24.181540000000002,24.181553333333333,24.181559999999998
Longitude : 87.92345166666668,87.92351166666667,87.92355,87.92359666666668,87.92364166666667,87.92367333333335
file name : Image_21082021113642525.png
|
2021-08-21 11:36:42.596745 |
209 |
34817434 |
Maintanance of Road with PCC from Somir ray house to Sattyanarayan konai house at Kamra |
200000 |
Maintanance of Road with PCC from Somir ray house to Sattyanarayan konai house at Kamra1 |
Completion of work |
-
latitude : 24.181555000000003,24.181544999999996,24.181553333333333
Longitude : 87.92345166666668,87.92356166666666,87.92365666666667
file name : Image_08082021123803960.png
|
2021-08-08 12:38:04.029662 |
210 |
46655334 |
Construction of new PCC drain with cover slab from Kundu pond to Kadar Ali house at Shilgram |
250000 |
Construction of new PCC drain with cover slab from Kundu pond to Kadar Ali house at Shilgram1 |
Completion of work |
-
latitude : 24.197193333333335,24.197193333333335,24.197193333333335
Longitude : 87.91647499999999,87.91647499999999,87.91647499999999
file name : Image_02082022124338706.png
|
2022-08-02 12:43:38.780963 |
211 |
46684101 |
Sinking a new tubewell mark II with platform soakpit and drain near Amirul kha house at Koyemba |
59649 |
Sinking a new tubewell mark II with platform soakpit and drain near Amirul kha house at Koyemba1 |
Completion of work |
-
latitude : 24.175819999999998
Longitude : 87.904235
file name : Image_15072022120614738.png
|
2022-07-15 12:06:14.798765 |
212 |
46684101 |
Sinking a new tubewell mark II with platform soakpit and drain near Amirul kha house at Koyemba |
59649 |
Sinking a new tubewell mark II with platform soakpit and drain near Amirul kha house at Koyemba1 |
Plinth level |
-
latitude : 24.17579
Longitude : 87.90422833333332
file name : Image_15072022120800805.png
|
2022-07-15 12:08:00.875552 |
213 |
46686030 |
Sinking a new tubewell with platform soakpit and drain near Madhai house at Pirtalapara |
60000 |
Sinking a new tubewell with platform soakpit and drain near Madhai house at Pirtalapara1 |
Completion of work |
-
latitude : 24.2120367
Longitude : 87.9161729
file name : Image_05082022113725369.png
|
2022-08-05 11:37:25.475039 |
214 |
46686030 |
Sinking a new tubewell with platform soakpit and drain near Madhai house at Pirtalapara |
60000 |
Sinking a new tubewell with platform soakpit and drain near Madhai house at Pirtalapara1 |
Plinth level |
-
latitude : 24.2120371
Longitude : 87.9161744
file name : Image_05082022113906199.png
|
2022-08-05 11:39:06.306643 |
215 |
46654220 |
Sinking a new mark2 tubewell with platform soakpit and drain near Nutun para at Gopalpur |
60000 |
Sinking a new mark2 tubewell with platform soakpit and drain near Nutun para at Gopalpur1 |
Roof laid |
-
latitude : 24.1991474
Longitude : 87.9531528
file name : Image_20032023113753948.png
|
2023-03-20 11:37:54.020023 |
216 |
46654220 |
Sinking a new mark2 tubewell with platform soakpit and drain near Nutun para at Gopalpur |
60000 |
Sinking a new mark2 tubewell with platform soakpit and drain near Nutun para at Gopalpur1 |
Completion of work |
-
latitude : 24.1991434
Longitude : 87.9528845
file name : Image_08082022105644343.png
|
2022-08-08 10:56:44.458316 |
217 |
34777019 |
Maintanance of road with PCC from Sahajahan sk house to subud das house at Mudhupur |
100000 |
Maintanance of road with PCC from Sahajahan sk house to subud das house at Mudhupur1 |
Completion of work |
-
latitude : 24.205715,24.20569833333333,24.2057,24.205703333333336,24.205706666666668,24.20571166666667
Longitude : 87.93302,87.93299333333334,87.93296833333333,87.93293,87.932915,87.93290333333334
file name : Image_14082021093232905.png
|
2021-08-14 09:32:32.991277 |
218 |
34777019 |
Maintanance of road with PCC from Sahajahan sk house to subud das house at Mudhupur |
100000 |
Maintanance of road with PCC from Sahajahan sk house to subud das house at Mudhupur1 |
Completion of work |
-
latitude : 24.20576,24.205753333333337,24.205753333333337
Longitude : 87.93277833333335,87.93278333333335,87.93278333333335
file name : Image_08082021100855885.png
|
2021-08-08 10:08:55.949377 |
219 |
34860674 |
Maintanance of road with PCC from Main road to Enam master house at Kabirajpur |
200000 |
Maintanance of road with PCC from Main road to Enam master house at Kabirajpur1 |
Roof laid |
-
latitude : 24.209818333333335,24.209818333333335,24.209825000000002,24.209825000000002,24.209833333333336,24.209833333333336,24.209833333333336,24.209833333333336,24.209841666666662,24.209841666666662,24.20985166666667,24.20985166666667,24.20985166666667,24.209860000000003,24.20986833333333
Longitude : 87.92954,87.92954,87.92953333333335,87.92953333333335,87.92953166666666,87.92953166666666,87.92953166666666,87.92953166666666,87.92952833333332,87.92952833333332,87.92952500000001,87.92952500000001,87.92952500000001,87.929515,87.92950333333334
file name : Image_10092021104957543.png
|
2021-09-10 10:49:57.629993 |
220 |
34860674 |
Maintanance of road with PCC from Main road to Enam master house at Kabirajpur |
200000 |
Maintanance of road with PCC from Main road to Enam master house at Kabirajpur1 |
Completion of work |
-
latitude : 24.209705,24.209683333333334,24.209675,24.20966
Longitude : 87.92959666666665,87.9296,87.92960166666666,87.92960666666667
file name : Image_08082021101212855.png
|
2021-08-08 10:12:12.927882 |
221 |
34862146 |
Maintanance of road with PCC From Durga mandir to Dujadhan house at pirtalapara |
210000 |
Maintanance of road with PCC From Durga mandir to Dujadhan house at pirtalapara1 |
Completion of work |
-
latitude : 24.20927166666667,24.20922666666667,24.20918,24.20916666666667,24.209088333333337,24.209066666666665,24.20904833333333,24.209038333333336,24.209038333333336,24.209024999999997,24.208975000000002,24.20894
Longitude : 87.92009166666666,87.92008333333334,87.92007166666666,87.92006666666666,87.92004666666665,87.92003500000001,87.92003333333332,87.92003500000001,87.92003500000001,87.92003666666666,87.92003166666667,87.92003500000001
file name : Image_21082021101925301.png
|
2021-08-21 10:19:25.366428 |
222 |
34862146 |
Maintanance of road with PCC From Durga mandir to Dujadhan house at pirtalapara |
210000 |
Maintanance of road with PCC From Durga mandir to Dujadhan house at pirtalapara1 |
Completion of work |
-
latitude : 24.209369999999996,24.209414999999996,24.209441666666667
Longitude : 87.92010499999999,87.92012833333335,87.920135
file name : Image_08082021101936249.png
|
2021-08-08 10:19:36.334532 |
223 |
34768622 |
Maintanance of Cultural stage with PCC at Gopalpur Paschimpara at Gopalpur |
280000 |
Maintanance of Cultural stage with PCC at Gopalpur Paschimpara at Gopalpur1 |
Completion of work |
-
latitude : 24.200263333333336
Longitude : 87.95472999999998
file name : Image_08032022102741367.png
|
2022-03-08 10:27:41.44602 |
224 |
34768622 |
Maintanance of Cultural stage with PCC at Gopalpur Paschimpara at Gopalpur |
280000 |
Maintanance of Cultural stage with PCC at Gopalpur Paschimpara at Gopalpur1 |
Plinth level |
-
latitude : 24.200316666666662
Longitude : 87.95477166666666
file name : Image_08032022103218213.png
|
2022-03-08 10:32:18.289335 |
225 |
46683138 |
Construction of new PCC drain with cover slab from DayaNidhi Sahu house to Suchandan mondal house a |
130000 |
Construction of new PCC drain with cover slab from DayaNidhi Sahu house to Suchandan mondal house a1 |
Completion of work |
-
latitude : 24.2120327,24.2120327,24.2120327
Longitude : 87.9161734,87.9161734,87.9161734
file name : Image_04082022140817047.png
|
2022-08-04 14:08:17.099161 |
226 |
34823560 |
Maintanance of Road with PCC from Bhagabatitala to sukhen saha house at Koyemba |
100000 |
Maintanance of Road with PCC from Bhagabatitala to sukhen saha house at Koyemba1 |
Roof laid |
-
latitude : 24.173108333333335,24.173105000000003,24.173105000000003
Longitude : 87.90839,87.90839833333332,87.908405
file name : Image_03092021163412611.png
|
2021-09-03 16:34:12.672809 |
227 |
34823560 |
Maintanance of Road with PCC from Bhagabatitala to sukhen saha house at Koyemba |
100000 |
Maintanance of Road with PCC from Bhagabatitala to sukhen saha house at Koyemba1 |
Completion of work |
-
latitude : 24.173150000000003,24.173115,24.17307,24.173049999999996,24.17302833333333,24.17299666666667,24.172974999999997
Longitude : 87.90843000000001,87.90841,87.90841166666665,87.90840333333333,87.90839833333332,87.90836333333333,87.90834833333332
file name : Image_17082021115640103.png
|
2021-08-17 11:56:40.185657 |
228 |
34823560 |
Maintanance of Road with PCC from Bhagabatitala to sukhen saha house at Koyemba |
100000 |
Maintanance of Road with PCC from Bhagabatitala to sukhen saha house at Koyemba1 |
Completion of work |
-
latitude : 24.17312666666667,24.173141666666666,24.17312666666667
Longitude : 87.908425,87.908415,87.90841166666665
file name : Image_08082021124723712.png
|
2021-08-08 12:47:23.785056 |
229 |
34853196 |
Maintanance of Road with PCC from Moatafa house to Amir house at Chhotochowki |
120000 |
Maintanance of Road with PCC from Moatafa house to Amir house at Chhotochowki1 |
Completion of work |
-
latitude : 24.201396666666664,24.201396666666664,24.216201666666667,24.216171666666664,24.216116666666668,24.216115,24.216115,24.216113333333336,24.216113333333336,24.216113333333336
Longitude : 87.95557333333333,87.95557333333333,87.91323166666668,87.91318500000001,87.91311333333333,87.91310666666668,87.91310833333334,87.913105,87.913105,87.91309833333335
file name : Image_13082021151135729.png
|
2021-08-13 15:11:35.844286 |
230 |
34853196 |
Maintanance of Road with PCC from Moatafa house to Amir house at Chhotochowki |
120000 |
Maintanance of Road with PCC from Moatafa house to Amir house at Chhotochowki1 |
Completion of work |
-
latitude : 24.201396666666664,24.201396666666664,24.216201666666667,24.216171666666664,24.216116666666668,24.216115,24.216115,24.216113333333336,24.216113333333336,24.216113333333336
Longitude : 87.95557333333333,87.95557333333333,87.91323166666668,87.91318500000001,87.91311333333333,87.91310666666668,87.91310833333334,87.913105,87.913105,87.91309833333335
file name : Image_13082021151143286.png
|
2021-08-13 15:11:43.38164 |
231 |
34853196 |
Maintanance of Road with PCC from Moatafa house to Amir house at Chhotochowki |
120000 |
Maintanance of Road with PCC from Moatafa house to Amir house at Chhotochowki1 |
Completion of work |
-
latitude : 24.21617,24.216188333333335,24.216178333333332,24.216168333333332,24.216161666666668,24.216144999999997,24.216121666666663,24.216111666666666,24.216093333333333,24.216078333333332,24.216056666666667,24.216046666666664,24.216018333333334
Longitude : 87.91309166666666,87.91313166666666,87.91312166666667,87.91311333333333,87.91310999999999,87.91309833333335,87.91309333333332,87.91308833333332,87.91308333333333,87.91307333333334,87.91304833333334,87.91304333333333,87.91303666666666
file name : Image_08082021103542960.png
|
2021-08-08 10:35:43.024922 |
232 |
56877952 |
Installation of Submersible pump with distribution pipeline in/c water storage Tank near Bagdipara I |
250000 |
Installation of Submersible pump with distribution pipeline in/c water storage Tank near Bagdipara I1 |
Plinth level |
-
latitude : 24.197195000000004
Longitude : 87.95282166666667
file name : Image_10042023133214549.png
|
2023-04-10 13:32:14.626662 |
233 |
56877952 |
Installation of Submersible pump with distribution pipeline in/c water storage Tank near Bagdipara I |
250000 |
Installation of Submersible pump with distribution pipeline in/c water storage Tank near Bagdipara I1 |
Completion of work |
-
latitude : 24.19713408
Longitude : 87.95300733
file name : Image_15032023103223331.png
|
2023-03-15 10:32:23.420326 |
234 |
34783150 |
Maintanance of Road with PCC from Khoka mondal house to Saidar rahaman house at silogram |
100000 |
Maintanance of Road with PCC from Khoka mondal house to Saidar rahaman house at silogram1 |
Roof laid |
-
latitude : 24.196535,24.196601666666666,24.19661833333333
Longitude : 87.91670666666666,87.91646666666665,87.91641166666668
file name : Image_03092021165901254.png
|
2021-09-03 16:59:01.327071 |
235 |
34783150 |
Maintanance of Road with PCC from Khoka mondal house to Saidar rahaman house at silogram |
100000 |
Maintanance of Road with PCC from Khoka mondal house to Saidar rahaman house at silogram1 |
Completion of work |
-
latitude : 24.196575,24.19661833333333,24.19662166666667
Longitude : 87.91657166666667,87.91639500000001,87.91638666666668
file name : Image_08082021105833560.png
|
2021-08-08 10:58:33.654859 |
236 |
34783150 |
Maintanance of Road with PCC from Khoka mondal house to Saidar rahaman house at silogram |
100000 |
Maintanance of Road with PCC from Khoka mondal house to Saidar rahaman house at silogram1 |
Completion of work |
-
latitude : 24.196575,24.19661833333333,24.19662166666667
Longitude : 87.91657166666667,87.91639500000001,87.91638666666668
file name : Image_08082021105836661.png
|
2021-08-08 10:58:36.732422 |
237 |
56878980 |
Installation of pump with distribution pipeline in/c water storage Tank near Khirul Basar at Motain |
250000 |
Installation of pump with distribution pipeline in/c water storage Tank near Khirul Basar at Motain1 |
Plinth level |
-
latitude : 24.20498
Longitude : 87.93663833333333
file name : Image_10042023114301459.png
|
2023-04-10 11:43:01.536338 |
238 |
56878980 |
Installation of pump with distribution pipeline in/c water storage Tank near Khirul Basar at Motain |
250000 |
Installation of pump with distribution pipeline in/c water storage Tank near Khirul Basar at Motain1 |
Completion of work |
-
latitude : 24.20499893
Longitude : 87.93670425
file name : Image_15032023103227025.png
|
2023-03-15 10:32:27.11732 |
239 |
56757377 |
Construction of new PCC road from Ohidul alam house to Jul Master house at Shilgram |
150000 |
Construction of new PCC road from Ohidul alam house to Jul Master house at Shilgram1 |
Completion of work |
-
latitude : 24.19466974,24.19466634,24.19465257
Longitude : 87.91529388,87.91531543,87.91536602
file name : Image_09032023114454994.png
|
2023-03-09 11:44:55.072551 |
240 |
56757377 |
Construction of new PCC road from Ohidul alam house to Jul Master house at Shilgram |
150000 |
Construction of new PCC road from Ohidul alam house to Jul Master house at Shilgram1 |
Plinth level |
-
latitude : 24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474,24.1991474
Longitude : 87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522,87.9531522
file name : Image_15032023103458920.png
|
2023-03-15 10:34:58.996564 |
241 |
56757377 |
Construction of new PCC road from Ohidul alam house to Jul Master house at Shilgram |
150000 |
Construction of new PCC road from Ohidul alam house to Jul Master house at Shilgram1 |
Roof laid |
-
latitude : 24.1922433,24.1922433,24.1922433,24.1922433,24.1922433,24.1922433,24.1922433,24.1922433,24.1922433,24.1922433,24.1922433,24.1922433,24.1922433,24.1922433,24.1922433,24.1922433,24.1922433,24.1922433,24.1922433,24.1922433,24.1922433
Longitude : 87.9128719,87.9128719,87.9128719,87.9128719,87.9128719,87.9128719,87.9128719,87.9128719,87.9128719,87.9128719,87.9128719,87.9128719,87.9128719,87.9128719,87.9128719,87.9128719,87.9128719,87.9128719,87.9128719,87.9128719,87.9128719
file name : Image_16032023124448288.png
|
2023-03-16 12:44:48.375903 |
242 |
56880172 |
Installation with distribution pipeline in/c water storage Tank Near Fulkumar house at Jhitkepara |
200000 |
Installation with distribution pipeline in/c water storage Tank Near Fulkumar house at Jhitkepara1 |
Plinth level |
-
latitude : 24.213823333333334
Longitude : 87.91676000000001
file name : Image_08052023135908712.png
|
2023-05-08 13:59:08.806171 |
243 |
56880172 |
Installation with distribution pipeline in/c water storage Tank Near Fulkumar house at Jhitkepara |
200000 |
Installation with distribution pipeline in/c water storage Tank Near Fulkumar house at Jhitkepara1 |
Completion of work |
-
latitude : 24.1991474
Longitude : 87.9531522
file name : Image_15032023103248506.png
|
2023-03-15 10:32:48.577586 |
244 |
56880318 |
Installation of pump with distribution pipeline in/c water storage Tank near Eid gaha at kabirajpur |
250000 |
Installation of pump with distribution pipeline in/c water storage Tank near Eid gaha at kabirajpur1 |
Plinth level |
-
latitude : 24.208978333333334
Longitude : 87.92436666666666
file name : Image_13042023135943574.png
|
2023-04-13 13:59:43.673085 |
245 |
56880318 |
Installation of pump with distribution pipeline in/c water storage Tank near Eid gaha at kabirajpur |
250000 |
Installation of pump with distribution pipeline in/c water storage Tank near Eid gaha at kabirajpur1 |
Completion of work |
-
latitude : 24.2084557
Longitude : 87.9247472
file name : Image_15032023103230647.png
|
2023-03-15 10:32:30.719624 |
246 |
39106508 |
Maint drain inc soakpit cover PCC Badal karmakar house to Halderpond at Chandpara |
200000 |
Maint drain inc soakpit cover PCC Badal karmakar house to Halderpond at Chandpara1 |
Roof laid |
-
latitude : 24.19441538862884,24.194401390850544,24.19441044330597,24.194425991736352,24.194444348104298
Longitude : 87.91314650326967,87.91319729760289,87.9131278116256,87.91300593875349,87.91290300898254
file name : Image_23032021110801106.png
|
2021-03-23 11:08:01.170726 |
247 |
39106508 |
Maint drain inc soakpit cover PCC Badal karmakar house to Halderpond at Chandpara |
200000 |
Maint drain inc soakpit cover PCC Badal karmakar house to Halderpond at Chandpara1 |
Completion of work |
-
latitude : 24.194461447186768,24.19444049242884,24.194415975362062,24.194387015886605
Longitude : 87.91270947083831,87.91282908059657,87.91299680247903,87.91318296454847
file name : Image_25022021090151544.png
|
2021-02-25 09:01:51.60326 |
248 |
39106508 |
Maint drain inc soakpit cover PCC Badal karmakar house to Halderpond at Chandpara |
200000 |
Maint drain inc soakpit cover PCC Badal karmakar house to Halderpond at Chandpara1 |
Plinth level |
-
latitude : 24.194445102475584,24.19444535393268,24.194457256235182,24.19443026650697
Longitude : 87.91271550580859,87.91278700344265,87.91282220743597,87.91290376335382
file name : Image_26022021161443358.png
|
2021-02-26 16:14:43.4398 |
249 |
39106609 |
Maint drain inc soakpit cover PCCThakur house to Main road via bindha house at Miyapara |
150000 |
Maint drain inc soakpit cover PCCThakur house to Main road via bindha house at Miyapara1 |
Roof laid |
-
latitude : 24.21103724744171,24.211032260209322
Longitude : 87.92065601795912,87.92065501213074
file name : Image_23032021123152922.png
|
2021-03-23 12:31:52.990305 |
250 |
39106609 |
Maint drain inc soakpit cover PCCThakur house to Main road via bindha house at Miyapara |
150000 |
Maint drain inc soakpit cover PCCThakur house to Main road via bindha house at Miyapara1 |
Completion of work |
-
latitude : 24.2110152868554,24.21091139316559
Longitude : 87.92062651365995,87.9206416849047
file name : Image_25022021084407319.png
|
2021-02-25 08:44:07.41616 |
251 |
39106609 |
Maint drain inc soakpit cover PCCThakur house to Main road via bindha house at Miyapara |
150000 |
Maint drain inc soakpit cover PCCThakur house to Main road via bindha house at Miyapara1 |
Plinth level |
-
latitude : 24.21098117250949,24.21098117250949
Longitude : 87.92068309150636,87.92068309150636
file name : Image_26022021164536509.png
|
2021-02-26 16:45:36.596521 |
252 |
47242985 |
Construction of new Culvert with PCC at Sastitala at Chotochowki |
250000 |
Construction of new Culvert with PCC at Sastitala at Chotochowki1 |
Plinth level |
-
latitude : 24.214256666666664,24.214256666666664,24.214256666666664
Longitude : 87.914635,87.914635,87.914635
file name : Image_19032022163322186.png
|
2022-03-19 16:33:22.254765 |
253 |
47242985 |
Construction of new Culvert with PCC at Sastitala at Chotochowki |
250000 |
Construction of new Culvert with PCC at Sastitala at Chotochowki1 |
Completion of work |
-
latitude : 24.2143,24.2143
Longitude : 87.91467499999999,87.91467499999999
file name : Image_19032022162848073.png
|
2022-03-19 16:28:48.137317 |
254 |
46685625 |
Construction of new Bathing ghat with PCC with attached Bathroom at Morol pond at Dunigram paschim |
200000 |
Construction of new Bathing ghat with PCC with attached Bathroom at Morol pond at Dunigram paschim 1 |
Plinth level |
-
latitude : 24.21211833
Longitude : 87.91621492
file name : Image_27022023131623443.png
|
2023-02-27 13:16:23.51119 |
255 |
56797156 |
Construction of new PCC road from Tarun konai house to Sandhi konai house at Kamra |
250000 |
Construction of new PCC road from Tarun konai house to Sandhi konai house at Kamra1 |
Roof laid |
-
latitude : 24.1880267,24.1880267,24.1880267,24.1880267,24.1880267,24.1880267
Longitude : 87.9103074,87.9103074,87.9103074,87.9103074,87.9103074,87.9103074
file name : Image_20032023114029664.png
|
2023-03-20 11:40:29.748075 |
256 |
56797156 |
Construction of new PCC road from Tarun konai house to Sandhi konai house at Kamra |
250000 |
Construction of new PCC road from Tarun konai house to Sandhi konai house at Kamra1 |
Plinth level |
-
latitude : 24.1991459,24.1991459,24.1991459
Longitude : 87.9531539,87.9531539,87.9531539
file name : Image_17032023104303406.png
|
2023-03-17 10:43:03.488502 |
257 |
56797156 |
Construction of new PCC road from Tarun konai house to Sandhi konai house at Kamra |
250000 |
Construction of new PCC road from Tarun konai house to Sandhi konai house at Kamra1 |
Completion of work |
-
latitude : 24.18278674,24.18285208,24.1827982
Longitude : 87.92384653,87.92386779,87.92385205
file name : Image_15032023103212203.png
|
2023-03-15 10:32:12.281148 |
258 |
56882351 |
Construction of new PCC drain with cover slab from Enamul house to Emdadul house at Dunigra Paschim |
100000 |
Construction of new PCC drain with cover slab from Enamul house to Emdadul house at Dunigra Paschim1 |
Completion of work |
-
latitude : 24.21040888,24.21028469,24.21022557
Longitude : 87.91709937,87.9170385,87.91698662
file name : Image_08032023133025949.png
|
2023-03-08 13:30:26.034115 |
259 |
56881572 |
Con of new PCC drain with cover slab Drain with PCC from Kadam sekh house to Entaj house a koyemba |
103000 |
Con of new PCC drain with cover slab Drain with PCC from Kadam sekh house to Entaj house a koyemba1 |
Roof laid |
-
latitude : 24.172604999999997,24.17260666666667,24.17260666666667,24.17260666666667,24.17260666666667,24.17260666666667,24.172598333333333
Longitude : 87.90866333333334,87.90866666666668,87.90867000000001,87.90867000000001,87.90867000000001,87.90867000000001,87.90868166666665
file name : Image_28032023111304264.png
|
2023-03-28 11:13:04.389705 |
260 |
56881572 |
Con of new PCC drain with cover slab Drain with PCC from Kadam sekh house to Entaj house a koyemba |
103000 |
Con of new PCC drain with cover slab Drain with PCC from Kadam sekh house to Entaj house a koyemba1 |
Plinth level |
-
latitude : 24.172649999999997,24.172649999999997,24.172611666666665
Longitude : 87.90875833333332,87.90875833333332,87.90873166666667
file name : Image_24032023130523334.png
|
2023-03-24 13:05:23.432913 |
261 |
56881572 |
Con of new PCC drain with cover slab Drain with PCC from Kadam sekh house to Entaj house a koyemba |
103000 |
Con of new PCC drain with cover slab Drain with PCC from Kadam sekh house to Entaj house a koyemba1 |
Completion of work |
-
latitude : 24.17238845,24.17238845,24.17238845
Longitude : 87.90886488,87.90886488,87.90886488
file name : Image_16032023124444111.png
|
2023-03-16 12:44:44.421386 |
262 |
56884929 |
Construction of new PCC drain with cover slab from Manuyaz sk house to Nasir mondal house at Hariram |
250000 |
Construction of new PCC drain with cover slab from Manuyaz sk house to Nasir mondal house at Hariram1 |
Roof laid |
-
latitude : 24.167501666666666,24.167501666666666,24.167501666666666
Longitude : 87.91078166666667,87.91078166666667,87.91078166666667
file name : Image_24032023152731300.png
|
2023-03-24 15:27:31.388827 |
263 |
56884929 |
Construction of new PCC drain with cover slab from Manuyaz sk house to Nasir mondal house at Hariram |
250000 |
Construction of new PCC drain with cover slab from Manuyaz sk house to Nasir mondal house at Hariram1 |
Plinth level |
-
latitude : 24.2118754,24.2118754,24.2118754,24.2118754,24.2118754,24.2118754,24.2118754,24.2118754,24.2118754
Longitude : 87.9182927,87.9182927,87.9182927,87.9182927,87.9182927,87.9182927,87.9182927,87.9182927,87.9182927
file name : Image_20032023113758650.png
|
2023-03-20 11:37:58.715804 |
264 |
56884929 |
Construction of new PCC drain with cover slab from Manuyaz sk house to Nasir mondal house at Hariram |
250000 |
Construction of new PCC drain with cover slab from Manuyaz sk house to Nasir mondal house at Hariram1 |
Completion of work |
-
latitude : 24.16751087,24.16751637,24.16752214,24.16753789
Longitude : 87.91075374,87.91075443,87.9107516,87.91074502
file name : Image_15032023103208662.png
|
2023-03-15 10:32:08.745662 |
265 |
46683468 |
Construction of new PCC drain with cover slabDrain with PCC from Pradip singha house to Library at |
150000 |
Construction of new PCC drain with cover slabDrain with PCC from Pradip singha house to Library at 1 |
Plinth level |
-
latitude : 24.2119922,24.2120402
Longitude : 87.9159197,87.9161763
file name : Image_28032023175018420.png
|
2023-03-28 17:50:18.489876 |
266 |
56881694 |
Con of new PCC drain cover slab Drain with PCC from Anath bandhu majumdar house to Masjid at kayemba |
300000 |
Con of new PCC drain cover slab Drain with PCC from Anath bandhu majumdar house to Masjid at kayemba1 |
Completion of work |
-
latitude : 24.2120399,24.2120399
Longitude : 87.9161496,87.9161496
file name : Image_29022024134345884.png
|
2024-02-29 13:43:45.987076 |
267 |
56879966 |
Installation ofpump with distribution pipeline in/c water storage Tank at pirtala at Chotochowki |
250000 |
Installation ofpump with distribution pipeline in/c water storage Tank at pirtala at Chotochowki1 |
Plinth level |
-
latitude : 24.213472
Longitude : 87.9139705
file name : Image_21032023121122175.png
|
2023-03-21 12:11:22.273565 |
268 |
56879966 |
Installation ofpump with distribution pipeline in/c water storage Tank at pirtala at Chotochowki |
250000 |
Installation ofpump with distribution pipeline in/c water storage Tank at pirtala at Chotochowki1 |
Completion of work |
-
latitude : 24.21384237
Longitude : 87.9142471
file name : Image_08032023133738813.png
|
2023-03-08 13:37:38.889864 |
269 |
56757036 |
Construction of new PCC road from Sisith saha House to Indrajit sahu house at Shilgram |
103000 |
Construction of new PCC road from Sisith saha House to Indrajit sahu house at Shilgram1 |
Plinth level |
-
latitude : 24.2120598,24.2120598
Longitude : 87.9161536,87.9161536
file name : Image_04052023131024071.png
|
2023-05-04 13:10:24.145461 |
270 |
56757036 |
Construction of new PCC road from Sisith saha House to Indrajit sahu house at Shilgram |
103000 |
Construction of new PCC road from Sisith saha House to Indrajit sahu house at Shilgram1 |
Completion of work |
-
latitude : 24.2122254,24.2120611
Longitude : 87.9161546,87.9161561
file name : Image_04052023130239809.png
|
2023-05-04 13:02:39.897149 |
271 |
56954375 |
Installation of pump with distribution pipeline in/c water storage Tank near Ananda let at Madhupur |
250000 |
Installation of pump with distribution pipeline in/c water storage Tank near Ananda let at Madhupur1 |
Completion of work |
-
latitude : 24.208173333333335
Longitude : 87.93357499999999
file name : Image_26052023160042726.png
|
2023-05-26 16:00:42.809265 |
272 |
56880586 |
Inst of Submersible pump with distribution pipeline storage Tank near Nuralam at pirtalapara |
250000 |
Inst of Submersible pump with distribution pipeline storage Tank near Nuralam at pirtalapara1 |
Plinth level |
-
latitude : 24.203566666666667
Longitude : 87.91658333333335
file name : Image_28032023111203290.png
|
2023-03-28 11:12:03.425915 |
273 |
56880586 |
Inst of Submersible pump with distribution pipeline storage Tank near Nuralam at pirtalapara |
250000 |
Inst of Submersible pump with distribution pipeline storage Tank near Nuralam at pirtalapara1 |
Completion of work |
-
latitude : 24.20363753
Longitude : 87.91651911
file name : Image_08032023130628508.png
|
2023-03-08 13:06:28.581798 |
274 |
56881348 |
Construction of new PCC drain with cover slab from Sujjad sk house to Dahatala at Chandpara |
103000 |
Construction of new PCC drain with cover slab from Sujjad sk house to Dahatala at Chandpara1 |
Completion of work |
-
latitude : 24.2122259,24.2122232,24.2122232
Longitude : 87.9161607,87.916157,87.916157
file name : Image_29092023172306488.png
|
2023-09-29 17:23:06.55697 |
275 |
56880853 |
Construction of new PCC drain with cover slab from Tamal Mondal house to Das pond at Joychandrapur |
150000 |
Construction of new PCC drain with cover slab from Tamal Mondal house to Das pond at Joychandrapur1 |
Completion of work |
-
latitude : 24.194913333333336,24.194911666666666,24.194906666666665
Longitude : 87.95606833333335,87.95607166666666,87.95607666666668
file name : Image_27052023115622223.png
|
2023-05-27 11:56:22.294415 |
276 |
56881239 |
Construction of new PCC drain with cover slab from Ananda Konai house to Mihir house at Shilgram |
125000 |
Construction of new PCC drain with cover slab from Ananda Konai house to Mihir house at Shilgram1 |
Completion of work |
-
latitude : 24.2120607,24.2120607,24.2120607
Longitude : 87.916178,87.916178,87.916178
file name : Image_14122023161621399.png
|
2023-12-14 16:16:21.459376 |
277 |
56881239 |
Construction of new PCC drain with cover slab from Ananda Konai house to Mihir house at Shilgram |
125000 |
Construction of new PCC drain with cover slab from Ananda Konai house to Mihir house at Shilgram1 |
Completion of work |
-
latitude : 24.2120589,24.2120588
Longitude : 87.9161486,87.9161537
file name : Image_13102023131918641.png
|
2023-10-13 13:19:18.817325 |
278 |
47243176 |
Construction of new PCC roadfrom Curren house to Alal sk house via dhulu sk house at Jhitkepara |
250000 |
Construction of new PCC roadfrom Curren house to Alal sk house via dhulu sk house at Jhitkepara1 |
Completion of work |
-
latitude : 24.2120598,24.2120598,24.2120598
Longitude : 87.9161745,87.9161745,87.9161745
file name : Image_22082022140929561.png
|
2022-08-22 14:09:29.61234 |
279 |
56882437 |
Construction of new PCC drain with cover slab from Sahid house to Anisur Rahaman house at Kabirajpur |
150000 |
Construction of new PCC drain with cover slab from Sahid house to Anisur Rahaman house at Kabirajpur1 |
Completion of work |
-
latitude : 24.2120636,24.2120636,24.2120636
Longitude : 87.9161764,87.9161764,87.9161764
file name : Image_14122023161721132.png
|
2023-12-14 16:17:21.191597 |
280 |
56882437 |
Construction of new PCC drain with cover slab from Sahid house to Anisur Rahaman house at Kabirajpur |
150000 |
Construction of new PCC drain with cover slab from Sahid house to Anisur Rahaman house at Kabirajpur1 |
Completion of work |
-
latitude : 24.20927,24.20927,24.20926833333333
Longitude : 87.92635166666666,87.92635166666666,87.92635333333334
file name : Image_26052023155915970.png
|
2023-05-26 15:59:16.081296 |
281 |
46684801 |
Construction of new PCC drain with cover slabDrain with PCC from Esahaf sk house to Salam sk house |
200000 |
Construction of new PCC drain with cover slabDrain with PCC from Esahaf sk house to Salam sk house 1 |
Roof laid |
-
latitude : 24.2116646,24.2139929,24.21404834,24.21408401,24.21412163,24.21416036,24.21420279,24.21420279,24.21428636
Longitude : 87.9149397,87.91279358,87.91277031,87.9127638,87.91276002,87.91275555,87.91274943,87.91274943,87.91273333
file name : Image_15022023131258891.png
|
2023-02-15 13:12:58.965663 |
282 |
47242658 |
Construction of new PCC from Main Road to Pirtala at Koyemba |
250000 |
Construction of new PCC from Main Road to Pirtala at Koyemba1 |
Completion of work |
-
latitude : 24.177329999999998,24.177326666666666,24.177326666666666
Longitude : 87.90985833333335,87.90986,87.90986
file name : Image_15072022122732312.png
|
2022-07-15 12:27:32.379592 |
283 |
47242658 |
Construction of new PCC from Main Road to Pirtala at Koyemba |
250000 |
Construction of new PCC from Main Road to Pirtala at Koyemba1 |
Plinth level |
-
latitude : 24.177313333333338,24.177313333333338,24.177313333333338
Longitude : 87.90987500000001,87.90987500000001,87.90987500000001
file name : Image_15072022123040043.png
|
2022-07-15 12:30:40.114537 |
284 |
47242658 |
Construction of new PCC from Main Road to Pirtala at Koyemba |
250000 |
Construction of new PCC from Main Road to Pirtala at Koyemba1 |
Roof laid |
-
latitude : 24.177311666666665,24.177311666666665,24.177311666666665
Longitude : 87.909885,87.909885,87.909885
file name : Image_15072022123224638.png
|
2022-07-15 12:32:24.7009 |
285 |
47243829 |
Construction of new PCC road from Gandu sk house to Edelmsk house at Dunigram miyapara |
250000 |
Construction of new PCC road from Gandu sk house to Edelmsk house at Dunigram miyapara1 |
Plinth level |
-
latitude : 24.212569999999996,24.212569999999996,24.212569999999996,24.212569999999996
Longitude : 87.92138166666668,87.92138166666668,87.92138166666668,87.92138166666668
file name : Image_02082022124651898.png
|
2022-08-02 12:46:51.970831 |
286 |
47243829 |
Construction of new PCC road from Gandu sk house to Edelmsk house at Dunigram miyapara |
250000 |
Construction of new PCC road from Gandu sk house to Edelmsk house at Dunigram miyapara1 |
Roof laid |
-
latitude : 24.212555,24.212555,24.212555,24.212555
Longitude : 87.92137333333334,87.92137333333334,87.92137333333334,87.92137333333334
file name : Image_02082022124815730.png
|
2022-08-02 12:48:15.804614 |
287 |
47243829 |
Construction of new PCC road from Gandu sk house to Edelmsk house at Dunigram miyapara |
250000 |
Construction of new PCC road from Gandu sk house to Edelmsk house at Dunigram miyapara1 |
Completion of work |
-
latitude : 24.212565,24.212565,24.212565
Longitude : 87.92136,87.92136,87.92136
file name : Image_02082022124415733.png
|
2022-08-02 12:44:15.803402 |
288 |
47236477 |
Construction of new PCC roadfrom Brojen Mondal house to Laxmitala at Balsa |
250000 |
Construction of new PCC roadfrom Brojen Mondal house to Laxmitala at Balsa1 |
Roof laid |
-
latitude : 24.21942,24.21942,24.21942,24.21942
Longitude : 87.93840833333334,87.93840833333334,87.93840833333334,87.93840833333334
file name : Image_02082022141822035.png
|
2022-08-02 14:18:22.097384 |
289 |
47236477 |
Construction of new PCC roadfrom Brojen Mondal house to Laxmitala at Balsa |
250000 |
Construction of new PCC roadfrom Brojen Mondal house to Laxmitala at Balsa1 |
Plinth level |
-
latitude : 24.219314999999998,24.219314999999998,24.219314999999998
Longitude : 87.93848166666666,87.93848166666666,87.93848166666666
file name : Image_02082022130720328.png
|
2022-08-02 13:07:20.388177 |
290 |
47236477 |
Construction of new PCC roadfrom Brojen Mondal house to Laxmitala at Balsa |
250000 |
Construction of new PCC roadfrom Brojen Mondal house to Laxmitala at Balsa1 |
Completion of work |
-
latitude : 24.219299999999997,24.219299999999997,24.219299999999997
Longitude : 87.93850666666667,87.93850666666667,87.93850666666667
file name : Image_02082022130248145.png
|
2022-08-02 13:02:48.212731 |
291 |
47241571 |
Construction of new PCC road with Various dia mtr of Hume Pipe for All Sansad of Dunigram GP area |
230000 |
Construction of new PCC road with Various dia mtr of Hume Pipe for All Sansad of Dunigram GP area1 |
Roof laid |
-
latitude : 24.212133333333334,24.212133333333334
Longitude : 87.91619,87.91619
file name : Image_02082022142356849.png
|
2022-08-02 14:23:56.908562 |
292 |
47241571 |
Construction of new PCC road with Various dia mtr of Hume Pipe for All Sansad of Dunigram GP area |
230000 |
Construction of new PCC road with Various dia mtr of Hume Pipe for All Sansad of Dunigram GP area1 |
Completion of work |
-
latitude : 24.212094999999998,24.212094999999998,24.212094999999998
Longitude : 87.91622833333334,87.91622833333334,87.91622833333334
file name : Image_02082022141829097.png
|
2022-08-02 14:18:29.160246 |
293 |
47241571 |
Construction of new PCC road with Various dia mtr of Hume Pipe for All Sansad of Dunigram GP area |
230000 |
Construction of new PCC road with Various dia mtr of Hume Pipe for All Sansad of Dunigram GP area1 |
Completion of work |
-
latitude : 24.212094999999998,24.212094999999998,24.212094999999998
Longitude : 87.91622833333334,87.91622833333334,87.91622833333334
file name : Image_02082022141836717.png
|
2022-08-02 14:18:36.776024 |
294 |
47241571 |
Construction of new PCC road with Various dia mtr of Hume Pipe for All Sansad of Dunigram GP area |
230000 |
Construction of new PCC road with Various dia mtr of Hume Pipe for All Sansad of Dunigram GP area1 |
Plinth level |
-
latitude : 24.2120377,24.2120377
Longitude : 87.9161704,87.9161704
file name : Image_02082022142016270.png
|
2022-08-02 14:20:16.331003 |
295 |
56878496 |
Installation of pump with distribution pipeline in/c water storage Tank at near Mokam Babladanga |
250000 |
Installation of pump with distribution pipeline in/c water storage Tank at near Mokam Babladanga1 |
Roof laid |
-
latitude : 24.194639999999996
Longitude : 87.97016666666666
file name : Image_15052023115637712.png
|
2023-05-15 11:56:37.785301 |
296 |
56878496 |
Installation of pump with distribution pipeline in/c water storage Tank at near Mokam Babladanga |
250000 |
Installation of pump with distribution pipeline in/c water storage Tank at near Mokam Babladanga1 |
Plinth level |
-
latitude : 24.194518333333335
Longitude : 87.97043166666666
file name : Image_15052023115540079.png
|
2023-05-15 11:55:40.151658 |
297 |
56878496 |
Installation of pump with distribution pipeline in/c water storage Tank at near Mokam Babladanga |
250000 |
Installation of pump with distribution pipeline in/c water storage Tank at near Mokam Babladanga1 |
Completion of work |
-
latitude : 24.19464268
Longitude : 87.97030499
file name : Image_15032023103215783.png
|
2023-03-15 10:32:15.869723 |
298 |
47246242 |
Construction of new protection toe wall with Bolder at asadul pond at Harirampur |
320000 |
Construction of new protection toe wall with Bolder at asadul pond at Harirampur1 |
Completion of work |
-
latitude : 24.166735000000003,24.166735000000003,24.166735000000003
Longitude : 87.91126666666666,87.91126666666666,87.91126666666666
file name : Image_15072022121510363.png
|
2022-07-15 12:15:10.441867 |
299 |
47246242 |
Construction of new protection toe wall with Bolder at asadul pond at Harirampur |
320000 |
Construction of new protection toe wall with Bolder at asadul pond at Harirampur1 |
Plinth level |
-
latitude : 24.166736666666665,24.166736666666665
Longitude : 87.91127333333334,87.91127333333334
file name : Image_15072022121655795.png
|
2022-07-15 12:16:55.852075 |
300 |
47246242 |
Construction of new protection toe wall with Bolder at asadul pond at Harirampur |
320000 |
Construction of new protection toe wall with Bolder at asadul pond at Harirampur1 |
Roof laid |
-
latitude : 24.16675,24.16675
Longitude : 87.91126166666666,87.91126166666666
file name : Image_15072022121816311.png
|
2022-07-15 12:18:16.370265 |
301 |
47245968 |
Construction of new Baby feeding room at Gp office meeting room corner |
150000 |
Construction of new Baby feeding room at Gp office meeting room corner1 |
Completion of work |
-
latitude : 24.2120632
Longitude : 87.9161719
file name : Image_29082022144317035.png
|
2022-08-29 14:43:17.115145 |
302 |
56798286 |
Construction of new PCC road from Sentu house to Sadek house at Paschim |
103000 |
Construction of new PCC road from Sentu house to Sadek house at Paschim1 |
Roof laid |
-
latitude : 24.212061,24.212061
Longitude : 87.9161766,87.9161766
file name : Image_10012024130833540.png
|
2024-01-10 13:08:33.642485 |
303 |
56798286 |
Construction of new PCC road from Sentu house to Sadek house at Paschim |
103000 |
Construction of new PCC road from Sentu house to Sadek house at Paschim1 |
Plinth level |
-
latitude : 24.2120566,24.2120566
Longitude : 87.9161666,87.9161666
file name : Image_10012024130650834.png
|
2024-01-10 13:06:50.930645 |
304 |
56798286 |
Construction of new PCC road from Sentu house to Sadek house at Paschim |
103000 |
Construction of new PCC road from Sentu house to Sadek house at Paschim1 |
Completion of work |
-
latitude : 24.212063,24.212063
Longitude : 87.9161757,87.9161757
file name : Image_10012024130436756.png
|
2024-01-10 13:04:36.867554 |
305 |
56880987 |
Construction of new PCC drain with cover slab from Kobir sk house to Golam sk house at Babladanga |
150000 |
Construction of new PCC drain with cover slab from Kobir sk house to Golam sk house at Babladanga1 |
Completion of work |
-
latitude : 24.19443833333333,24.19445,24.194460000000003,24.194458333333333
Longitude : 87.96586333333335,87.965835,87.96580333333334,87.96579333333332
file name : Image_27052023120304010.png
|
2023-05-27 12:03:04.090866 |
306 |
47236294 |
Construction of new road protection Toe wall with Bolder at Kalital pond at Babladanga |
250000 |
Construction of new road protection Toe wall with Bolder at Kalital pond at Babladanga1 |
Plinth level |
-
latitude : 24.1991468,24.1991474
Longitude : 87.9531532,87.9531525
file name : Image_20032023113749393.png
|
2023-03-20 11:37:49.464801 |
307 |
47236294 |
Construction of new road protection Toe wall with Bolder at Kalital pond at Babladanga |
250000 |
Construction of new road protection Toe wall with Bolder at Kalital pond at Babladanga1 |
Plinth level |
-
latitude : 24.193320000000003,24.193320000000003,24.193320000000003
Longitude : 87.96704166666665,87.96704166666665,87.96704166666665
file name : Image_15072022110618764.png
|
2022-07-15 11:06:18.819143 |
308 |
56881085 |
Construction of new PCC drain with cover slab from Aloke Adhikary house to Kalitala at Balsa |
150000 |
Construction of new PCC drain with cover slab from Aloke Adhikary house to Kalitala at Balsa1 |
Completion of work |
-
latitude : 24.2120379,24.2120379
Longitude : 87.916158,87.916158
file name : Image_09102023151735035.png
|
2023-10-09 15:17:35.141658 |
309 |
56879500 |
Inst of pump with distribution pipeline in/c water storage Tank near Khoka Monda at shilgram |
175000 |
Inst of pump with distribution pipeline in/c water storage Tank near Khoka Monda at shilgram1 |
Roof laid |
-
latitude : 24.196596666666665
Longitude : 87.91673666666665
file name : Image_23052023160434582.png
|
2023-05-23 16:04:34.651839 |
310 |
56879500 |
Inst of pump with distribution pipeline in/c water storage Tank near Khoka Monda at shilgram |
175000 |
Inst of pump with distribution pipeline in/c water storage Tank near Khoka Monda at shilgram1 |
Plinth level |
-
latitude : 24.196571666666667
Longitude : 87.91676333333335
file name : Image_23052023160208610.png
|
2023-05-23 16:02:08.684421 |
311 |
56879500 |
Inst of pump with distribution pipeline in/c water storage Tank near Khoka Monda at shilgram |
175000 |
Inst of pump with distribution pipeline in/c water storage Tank near Khoka Monda at shilgram1 |
Plinth level |
-
latitude : 24.196539999999995
Longitude : 87.91673166666666
file name : Image_09042023180233311.png
|
2023-04-09 18:02:33.443043 |
312 |
56879500 |
Inst of pump with distribution pipeline in/c water storage Tank near Khoka Monda at shilgram |
175000 |
Inst of pump with distribution pipeline in/c water storage Tank near Khoka Monda at shilgram1 |
Completion of work |
-
latitude : 24.19661976
Longitude : 87.91668772
file name : Image_09032023114938380.png
|
2023-03-09 11:49:38.458727 |
313 |
56879619 |
Inst of pump with distribution pipeline in/c water storage Tank at Barjali pond par at Chandpara |
200000 |
Inst of pump with distribution pipeline in/c water storage Tank at Barjali pond par at Chandpara1 |
Roof laid |
-
latitude : 24.19051833333333
Longitude : 87.91359333333334
file name : Image_23052023161139112.png
|
2023-05-23 16:11:39.20471 |
314 |
56879619 |
Inst of pump with distribution pipeline in/c water storage Tank at Barjali pond par at Chandpara |
200000 |
Inst of pump with distribution pipeline in/c water storage Tank at Barjali pond par at Chandpara1 |
Plinth level |
-
latitude : 24.19053
Longitude : 87.91358833333334
file name : Image_23052023160942034.png
|
2023-05-23 16:09:42.102982 |
315 |
56879619 |
Inst of pump with distribution pipeline in/c water storage Tank at Barjali pond par at Chandpara |
200000 |
Inst of pump with distribution pipeline in/c water storage Tank at Barjali pond par at Chandpara1 |
Completion of work |
-
latitude : 24.18963154
Longitude : 87.91103392
file name : Image_15032023103237686.png
|
2023-03-15 10:32:37.760295 |
316 |
56879855 |
Installation of Submersible pump with pipeline in water storage Tank at Sajal Pramanik at Chandpara |
200000 |
Installation of Submersible pump with pipeline in water storage Tank at Sajal Pramanik at Chandpara1 |
Roof laid |
-
latitude : 24.189518333333332
Longitude : 87.91098166666667
file name : Image_23052023161649406.png
|
2023-05-23 16:16:49.480509 |
317 |
56879855 |
Installation of Submersible pump with pipeline in water storage Tank at Sajal Pramanik at Chandpara |
200000 |
Installation of Submersible pump with pipeline in water storage Tank at Sajal Pramanik at Chandpara1 |
Plinth level |
-
latitude : 24.18951666666667
Longitude : 87.91099333333335
file name : Image_23052023161516176.png
|
2023-05-23 16:15:16.248832 |
318 |
56879855 |
Installation of Submersible pump with pipeline in water storage Tank at Sajal Pramanik at Chandpara |
200000 |
Installation of Submersible pump with pipeline in water storage Tank at Sajal Pramanik at Chandpara1 |
Completion of work |
-
latitude : 24.1991469
Longitude : 87.9531532
file name : Image_15032023103234193.png
|
2023-03-15 10:32:34.269568 |
319 |
39105431 |
Sinking of submersible pump with pipe line near Masjid at Harirampur |
240000 |
Sinking of s.ubmersible pump with pipe line near Masjid at Harirampur1 |
Completion of work |
-
latitude : 24.168146666666665
Longitude : 87.91084833333335
file name : Image_03092021163433420.png
|
2021-09-03 16:34:33.488572 |
320 |
39105755 |
Maintanance of road protection wall with pcc near abdul roup house at Tithidanga. |
300000 |
Maintanance of road protection wall with pcc near abdul roup house at Tithidanga.1 |
Completion of work |
-
latitude : 24.2120821,24.2120841
Longitude : 87.9160986,87.9161006
file name : Image_21122021130529670.png
|
2021-12-21 13:05:29.728636 |
321 |
39105755 |
Maintanance of road protection wall with pcc near abdul roup house at Tithidanga. |
300000 |
Maintanance of road protection wall with pcc near abdul roup house at Tithidanga.1 |
Completion of work |
-
latitude : 24.2120859,24.2120859
Longitude : 87.9160989,87.9160989
file name : Image_21122021125304156.png
|
2021-12-21 12:53:04.231267 |
322 |
34858607 |
Maintanance of Bathing ghat with PCC at dighi paschim par at Dunigram Paschim |
100000 |
Maintanance of ..Bathing ghat with PCC at dighi paschim par at Dunigram Paschim1 |
Completion of work |
-
latitude : 24.21099
Longitude : 87.91649666666666
file name : Image_08032022124332054.png
|
2022-03-08 12:43:32.140643 |
323 |
46685026 |
Construction of new PCC drain with cover slab from Tuktuk house to sabad house at Jhitkepara |
100000 |
Construction of new PCC drain with cover slab from Tuktuk house to sabad house at Jhitkepara1 |
Completion of work |
-
latitude : 24.2120606,24.2120606
Longitude : 87.9161712,87.9161712
file name : Image_16082022120615321.png
|
2022-08-16 12:06:15.415861 |
324 |
46654769 |
Construction of new PCC drain with cover slab from Abu hasan house to Nazrul sk house at Motain |
250000 |
Construction of new PCC drain with cover slab from Abu hasan house to Nazrul sk house at Motain1 |
Completion of work |
-
latitude : 24.212098333333333,24.212098333333333
Longitude : 87.91615333333333,87.91615333333333
file name : Image_16082022121025018.png
|
2022-08-16 12:10:25.119966 |
325 |
47236664 |
Construction of new PCC roadfrom Main Rastha to Kamal sekh house via Kacchu let house at Motain |
250000 |
Construction of new PCC roadfrom Main Rastha to Kamal sekh house via Kacchu let house at Motain1 |
Roof laid |
-
latitude : 24.206808333333335,24.206808333333335,24.206808333333335,24.206808333333335,24.206808333333335
Longitude : 87.93207666666667,87.93207666666667,87.93208833333334,87.93208833333334,87.93208833333334
file name : Image_28032023120402032.png
|
2023-03-28 12:04:04.082431 |
326 |
47236664 |
Construction of new PCC roadfrom Main Rastha to Kamal sekh house via Kacchu let house at Motain |
250000 |
Construction of new PCC roadfrom Main Rastha to Kamal sekh house via Kacchu let house at Motain1 |
Plinth level |
-
latitude : 24.206783333333338,24.20674166666667,24.20674166666667,24.20672666666667,24.20672666666667,24.206711666666667,24.206711666666667,24.206711666666667,24.20668333333333,24.20668333333333,24.20668333333333,24.20666833333333,24.206656666666664,24.206656666666664,24.206645,24.206633333333336,24.206633333333336,24.206621666666667
Longitude : 87.93221833333334,87.93221999999999,87.93221999999999,87.93221999999999,87.93221999999999,87.93221666666668,87.93221666666668,87.93221666666668,87.93220833333335,87.93220833333335,87.93220833333335,87.93220333333332,87.93220000000001,87.93220000000001,87.932195,87.93218833333334,87.93218833333334,87.93218499999999
file name : Image_25032023113512108.png
|
2023-03-25 11:35:12.28857 |
327 |
47236664 |
Construction of new PCC roadfrom Main Rastha to Kamal sekh house via Kacchu let house at Motain |
250000 |
Construction of new PCC roadfrom Main Rastha to Kamal sekh house via Kacchu let house at Motain1 |
Completion of work |
-
latitude : 24.2120598,24.2120598,24.2120598
Longitude : 87.9161745,87.9161745,87.9161745
file name : Image_16082022121128573.png
|
2022-08-16 12:11:28.670552 |
328 |
46683318 |
Construction of new PCC drain with cover slabDrain with PCC from Salam house to Lisad house via Dah |
350000 |
Construction of new PCC drain with cover slabDrain with PCC from Salam house to Lisad house via Dah1 |
Roof laid |
-
latitude : 24.19522833333333,24.19522833333333,24.19522833333333
Longitude : 87.91349999999998,87.91349999999998,87.91349999999998
file name : Image_15072022124608564.png
|
2022-07-15 12:46:08.655035 |
329 |
46683318 |
Construction of new PCC drain with cover slabDrain with PCC from Salam house to Lisad house via Dah |
350000 |
Construction of new PCC drain with cover slabDrain with PCC from Salam house to Lisad house via Dah1 |
Completion of work |
-
latitude : 24.19493333333333,24.19493333333333,24.19493333333333
Longitude : 87.91781666666665,87.91781833333334,87.91781833333334
file name : Image_14072022165332830.png
|
2022-07-14 16:53:32.943941 |
330 |
46683318 |
Construction of new PCC drain with cover slabDrain with PCC from Salam house to Lisad house via Dah |
350000 |
Construction of new PCC drain with cover slabDrain with PCC from Salam house to Lisad house via Dah1 |
Plinth level |
-
latitude : 24.194894999999995,24.194894999999995,24.194894999999995
Longitude : 87.91780666666666,87.91780666666666,87.91780666666666
file name : Image_14072022165754142.png
|
2022-07-14 16:57:54.257954 |
331 |
46683318 |
Construction of new PCC drain with cover slabDrain with PCC from Salam house to Lisad house via Dah |
350000 |
Construction of new PCC drain with cover slabDrain with PCC from Salam house to Lisad house via Dah1 |
Roof laid |
-
latitude : 24.194905000000002,24.194905000000002,24.194905000000002
Longitude : 87.91782166666665,87.91782166666665,87.91782166666665
file name : Image_14072022165913358.png
|
2022-07-14 16:59:13.490413 |
332 |
46684531 |
Construction of new PCC drain with cover slab from Ajit Konai house to Manab Konai house at Kamra |
200000 |
Construction of new PCC drain with cover slab from Ajit Konai house to Manab Konai house at Kamra1 |
Completion of work |
-
latitude : 24.182351666666666,24.182351666666666,24.182351666666666
Longitude : 87.92368166666665,87.92368166666665,87.92368166666665
file name : Image_03022022111721536.png
|
2022-02-03 11:17:21.602595 |
333 |
46684531 |
Construction of new PCC drain with cover slab from Ajit Konai house to Manab Konai house at Kamra |
200000 |
Construction of new PCC drain with cover slab from Ajit Konai house to Manab Konai house at Kamra1 |
Completion of work |
-
latitude : 24.181753333333337,24.18175666666667,24.18176,24.18176,24.181765000000002
Longitude : 87.92379333333335,87.92379333333335,87.92379666666666,87.92379666666666,87.92379833333334
file name : Image_01022022134348278.png
|
2022-02-01 13:43:48.433719 |
334 |
46685894 |
Construction of new PCC drain with cover slab from Ahad shop to sastitala gabbar house at Dunigram |
250000 |
Construction of new PCC drain with cover slab from Ahad shop to sastitala gabbar house at Dunigram 1 |
Completion of work |
-
latitude : 24.210473333333333,24.210473333333333,24.210473333333333
Longitude : 87.92018000000002,87.92018000000002,87.92018000000002
file name : Image_01022022153101699.png
|
2022-02-01 15:31:01.785649 |
335 |
39105232 |
Sinking of submersible pump with pipe line near Motahar sk house at Motain. |
240000 |
Sinking of su.bmersible pump with pipe line near Motahar sk house at Motain. 1 |
Completion of work |
-
latitude : 24.20774333333333
Longitude : 87.93905666666666
file name : Image_04092021103947033.png
|
2021-09-04 10:39:47.117281 |
336 |
39105633 |
Sinking of submersible pump with pipe line near Miyapukur at Dunigram pirtala para |
240000 |
Sinking of.. submersible pump with pipe line near Miyapukur at Dunigram pirtala para1 |
Completion of work |
-
latitude : 24.210451603867114
Longitude : 87.9186897072941
file name : Image_25022021085057125.png
|
2021-02-25 08:50:57.210197 |
337 |
39105633 |
Sinking of submersible pump with pipe line near Miyapukur at Dunigram pirtala para |
240000 |
Sinking of.. submersible pump with pipe line near Miyapukur at Dunigram pirtala para1 |
Plinth level |
-
latitude : 24.210436390712857
Longitude : 87.91870647110045
file name : Image_26022021172509616.png
|
2021-02-26 17:25:09.689212 |
338 |
39105173 |
Sinking of submersible pump with pipe line at Kutubpur. |
240000 |
Sinking of ..submersible pump with pipe line at Kutubpur.1 |
Completion of work |
-
latitude : 24.220345015637577
Longitude : 87.95181356370449
file name : Image_25022021084207890.png
|
2021-02-25 08:42:07.972681 |
339 |
39105173 |
Sinking of submersible pump with pipe line at Kutubpur. |
240000 |
Sinking of ..submersible pump with pipe line at Kutubpur.1 |
Plinth level |
-
latitude : 24.21995848417282
Longitude : 87.95163427479565
file name : Image_27022021104303372.png
|
2021-02-27 10:43:03.45572 |
340 |
56797407 |
Construction of new PCC road from Manik sk house to Netu sk house at Harirampur |
200000 |
Construction of new PCC road from Manik sk house to Netu sk house at Harirampur1 |
Completion of work |
-
latitude : 24.16827333333333,24.16827333333333,24.16827333333333,24.16827333333333
Longitude : 87.90977833333334,87.90977833333334,87.90977833333334,87.90978666666666
file name : Image_26052023093713990.png
|
2023-05-26 09:37:14.076593 |
341 |
56797407 |
Construction of new PCC road from Manik sk house to Netu sk house at Harirampur |
200000 |
Construction of new PCC road from Manik sk house to Netu sk house at Harirampur1 |
Plinth level |
-
latitude : 24.168288333333333,24.168290000000002,24.168290000000002,24.168290000000002
Longitude : 87.90988,87.90987666666666,87.90987333333332,87.90987333333332
file name : Image_26052023095936848.png
|
2023-05-26 09:59:36.937295 |
342 |
56880719 |
Instof Submersible pump with distrib in/c water storage Tank near Durga Mandir at pirtalapara |
150000 |
Instof Submersible pump with distrib in/c water storage Tank near Durga Mandir at pirtalapara1 |
Plinth level |
-
latitude : 24.208775
Longitude : 87.91998666666665
file name : Image_10062023104341598.png
|
2023-06-10 10:43:41.663576 |
343 |
56880719 |
Instof Submersible pump with distrib in/c water storage Tank near Durga Mandir at pirtalapara |
150000 |
Instof Submersible pump with distrib in/c water storage Tank near Durga Mandir at pirtalapara1 |
Completion of work |
-
latitude : 24.20879166666667
Longitude : 87.91997
file name : Image_10062023104040793.png
|
2023-06-10 10:40:40.858617 |
344 |
56797520 |
Construction of new PCC road from Pirtala to Saheb house at Chotochowki |
130000 |
Construction of new PCC road from Pirtala to Saheb house at Chotochowki1 |
Roof laid |
-
latitude : 24.2120275,24.212119999999995,24.212119999999995,24.212119999999995
Longitude : 87.9161214,87.91624500000002,87.91624500000002,87.91624500000002
file name : Image_07082023121551345.png
|
2023-08-07 12:15:51.412332 |
345 |
56797520 |
Construction of new PCC road from Pirtala to Saheb house at Chotochowki |
130000 |
Construction of new PCC road from Pirtala to Saheb house at Chotochowki1 |
Plinth level |
-
latitude : 24.213661666666667,24.213661666666667,24.213661666666667,24.213661666666667
Longitude : 87.91404499999999,87.91404499999999,87.91404499999999,87.91404499999999
file name : Image_31072023140430724.png
|
2023-07-31 14:04:30.798189 |
346 |
56797520 |
Construction of new PCC road from Pirtala to Saheb house at Chotochowki |
130000 |
Construction of new PCC road from Pirtala to Saheb house at Chotochowki1 |
Completion of work |
-
latitude : 24.21374166666667,24.213743333333333,24.213743333333333
Longitude : 87.91411333333332,87.91412333333334,87.91412333333334
file name : Image_27052023112216164.png
|
2023-05-27 11:22:16.239208 |
347 |
56755993 |
Construction of new road protection Toe wall with Bolder at Alamin house to sadek house at Babla |
300000 |
Construction of new road protection Toe wall with Bolder at Alamin house to sadek house at Babla1 |
Plinth level |
-
latitude : 24.193410000000004,24.193410000000004,24.193410000000004
Longitude : 87.97423666666667,87.97423666666667,87.97423666666667
file name : Image_31072023133854184.png
|
2023-07-31 13:38:54.254717 |
348 |
56755993 |
Construction of new road protection Toe wall with Bolder at Alamin house to sadek house at Babla |
300000 |
Construction of new road protection Toe wall with Bolder at Alamin house to sadek house at Babla1 |
Completion of work |
-
latitude : 24.193399999999997,24.19338833333334,24.19338833333334,24.19337833333333
Longitude : 87.97429500000001,87.97428999999998,87.97428999999998,87.97428666666669
file name : Image_31072023133222494.png
|
2023-07-31 13:32:22.571036 |
349 |
56798458 |
Construction of new PCC road from Anisur house to Somir molla house at Kabirajpur |
200000 |
Construction of new PCC road from Anisur house to Somir molla house at Kabirajpur1 |
Roof laid |
-
latitude : 24.209153333333333,24.209146666666665,24.209146666666665
Longitude : 87.92635,87.92634500000001,87.92634500000001
file name : Image_07082023151628964.png
|
2023-08-07 15:16:29.034048 |
350 |
56798458 |
Construction of new PCC road from Anisur house to Somir molla house at Kabirajpur |
200000 |
Construction of new PCC road from Anisur house to Somir molla house at Kabirajpur1 |
Plinth level |
-
latitude : 24.20843166666667,24.208451666666665,24.208470000000002,24.208470000000002,24.208481666666664,24.208481666666664
Longitude : 87.92574166666667,87.92575166666666,87.92575666666669,87.92575666666669,87.92575833333333,87.92575833333333
file name : Image_04082023112321167.png
|
2023-08-04 11:23:21.254892 |
351 |
56798458 |
Construction of new PCC road from Anisur house to Somir molla house at Kabirajpur |
200000 |
Construction of new PCC road from Anisur house to Somir molla house at Kabirajpur1 |
Completion of work |
-
latitude : 24.208368333333336,24.208399999999997,24.208405000000003
Longitude : 87.925745,87.92575333333335,87.92574833333335
file name : Image_04082023111525132.png
|
2023-08-04 11:15:25.205518 |
352 |
56798611 |
Construction of new PCC road from Jomir sk house to Samu sk house via Nobir house at miyapara |
200000 |
Construction of new PCC road from Jomir sk house to Samu sk house via Nobir house at miyapara1 |
Completion of work |
-
latitude : 24.211971,24.211971,24.211971
Longitude : 87.9159485,87.9159485,87.9159485
file name : Image_29092023172647399.png
|
2023-09-29 17:26:47.464683 |
353 |
56882940 |
Construction of new PCC drain with cover slab from Alahan house to Lalchand sk house at Miyapara |
150000 |
Construction of new PCC drain with cover slab from Alahan house to Lalchand sk house at Miyapara1 |
Completion of work |
-
latitude : 24.2120597,24.2120597
Longitude : 87.9161551,87.9161551
file name : Image_13102023131309528.png
|
2023-10-13 13:13:09.621706 |
354 |
56773018 |
Construction of new PCC road from Gayanath mal house to Astik mal house at Koyemba |
103000 |
Construction of new PCC road from Gayanath mal house to Astik mal house at Koyemba1 |
Plinth level |
-
latitude : 24.173321666666666,24.173321666666666,24.17332666666667,24.17332666666667,24.173330000000004
Longitude : 87.906945,87.906945,87.90693833333334,87.90693833333334,87.90693000000002
file name : Image_20092023115540093.png
|
2023-09-20 11:55:40.155819 |
355 |
56773018 |
Construction of new PCC road from Gayanath mal house to Astik mal house at Koyemba |
103000 |
Construction of new PCC road from Gayanath mal house to Astik mal house at Koyemba1 |
Completion of work |
-
latitude : 24.173394999999996,24.173394999999996,24.173394999999996
Longitude : 87.90699333333332,87.90700666666667,87.90700666666667
file name : Image_27052023100932399.png
|
2023-05-27 10:09:32.473609 |
356 |
56881472 |
Cons of new PCC drain with cover slab from Arun karmakar house to Shibsagar land at Chandpara |
103000 |
Cons of new PCC drain with cover slab from Arun karmakar house to Shibsagar land at Chandpara1 |
Roof laid |
-
latitude : 24.194860000000002,24.19485666666667,24.19485666666667
Longitude : 87.91195166666667,87.91195666666665,87.91195666666665
file name : Image_20092023123150952.png
|
2023-09-20 12:31:51.045951 |
357 |
56881472 |
Cons of new PCC drain with cover slab from Arun karmakar house to Shibsagar land at Chandpara |
103000 |
Cons of new PCC drain with cover slab from Arun karmakar house to Shibsagar land at Chandpara1 |
Plinth level |
-
latitude : 24.194748333333337,24.194748333333337,24.194748333333337
Longitude : 87.91179166666667,87.91179166666667,87.91179166666667
file name : Image_07082023122742281.png
|
2023-08-07 12:27:42.347933 |
358 |
56881472 |
Cons of new PCC drain with cover slab from Arun karmakar house to Shibsagar land at Chandpara |
103000 |
Cons of new PCC drain with cover slab from Arun karmakar house to Shibsagar land at Chandpara1 |
Completion of work |
-
latitude : 24.194826666666668,24.194826666666668
Longitude : 87.91205333333333,87.91205333333333
file name : Image_07082023121815412.png
|
2023-08-07 12:18:15.482102 |
359 |
56882153 |
Con of new PCC drain with cover slab from Sunil Mal house to Amit master house at Dunigram paschim |
250000 |
Con of new PCC drain with cover slab from Sunil Mal house to Amit master house at Dunigram paschim1 |
Completion of work |
-
latitude : 24.2120547,24.2120547
Longitude : 87.9161618,87.9161618
file name : Image_14122023161214939.png
|
2023-12-14 16:12:15.018505 |
360 |
56882008 |
Construction of new PCC drain with cover slab fromMannan sk house to Jahagir house at Jhitkepara |
200000 |
Construction of new PCC drain with cover slab fromMannan sk house to Jahagir house at Jhitkepara1 |
Completion of work |
-
latitude : 24.2120387,24.2120387,24.2120387
Longitude : 87.9161558,87.9161558,87.9161558
file name : Image_09102023151422792.png
|
2023-10-09 15:14:22.906761 |
361 |
56878238 |
Installation of pump with distribution pipeline in/c water storage Tank at near Bhanumal at gopalpur |
250000 |
Installation of pump with distribution pipeline in/c water storage Tank at near Bhanumal at gopalpur1 |
Plinth level |
-
latitude : 24.20107833333333
Longitude : 87.95338833333332
file name : Image_26092023154333041.png
|
2023-09-26 15:43:33.116793 |
362 |
56878238 |
Installation of pump with distribution pipeline in/c water storage Tank at near Bhanumal at gopalpur |
250000 |
Installation of pump with distribution pipeline in/c water storage Tank at near Bhanumal at gopalpur1 |
Completion of work |
-
latitude : 24.200933333333335
Longitude : 87.95339
file name : Image_27052023100817548.png
|
2023-05-27 10:08:17.639046 |
363 |
67246096 |
Drainage Construction |
213000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.2120399
Longitude : 87.9161496
file name : Image_29022024133238190.png
|
2024-02-29 13:32:38.286687 |
364 |
67246096 |
Drainage Construction |
213000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.2120399
Longitude : 87.9161496
file name : Image_29022024131345943.png
|
2024-02-29 13:13:46.030113 |
365 |
67246096 |
Drainage Construction |
213000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.2120399
Longitude : 87.9161496
file name : Image_29022024125945893.png
|
2024-02-29 12:59:46.043214 |
366 |
67246096 |
Drainage Construction |
213000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.2120399
Longitude : 87.9161496
file name : Image_29022024125936417.png
|
2024-02-29 12:59:36.570792 |
367 |
67246584 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.2120399
Longitude : 87.9161496
file name : Image_29022024133518203.png
|
2024-02-29 13:35:18.291994 |
368 |
67246584 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.2120399
Longitude : 87.9161496
file name : Image_29022024131512771.png
|
2024-02-29 13:15:12.858578 |
369 |
67246584 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.2120399
Longitude : 87.9161496
file name : Image_29022024125927338.png
|
2024-02-29 12:59:27.678374 |
370 |
67246798 |
Drainage Construction |
250000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.212057
Longitude : 87.9161722
file name : Image_09012024165252250.png
|
2024-01-09 16:52:52.303328 |
371 |
67246798 |
Drainage Construction |
250000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.212057
Longitude : 87.9161722
file name : Image_09012024164750464.png
|
2024-01-09 16:47:50.526314 |
372 |
67246798 |
Drainage Construction |
250000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.2120614
Longitude : 87.9161749
file name : Image_09012024160651363.png
|
2024-01-09 16:06:51.42349 |
373 |
67246798 |
Drainage Construction |
250000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.2120614
Longitude : 87.9161749
file name : Image_09012024160648561.png
|
2024-01-09 16:06:48.615009 |
374 |
67221644 |
Construction of roads |
130000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.2120399,24.2120399
Longitude : 87.9161496,87.9161496
file name : Image_29022024133127054.png
|
2024-02-29 13:31:27.144853 |
375 |
67221644 |
Construction of roads |
130000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.2120399,24.2120399
Longitude : 87.9161496,87.9161496
file name : Image_29022024131837033.png
|
2024-02-29 13:18:37.135397 |
376 |
67221644 |
Construction of roads |
130000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2120399,24.2120399
Longitude : 87.9161496,87.9161496
file name : Image_29022024131639590.png
|
2024-02-29 13:16:39.672533 |
377 |
67219834 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.2120399,24.2120399
Longitude : 87.9161496,87.9161496
file name : Image_29022024133311956.png
|
2024-02-29 13:33:12.034787 |
378 |
67219834 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.2120399,24.2120399
Longitude : 87.9161496,87.9161496
file name : Image_29022024131321270.png
|
2024-02-29 13:13:21.351406 |
379 |
67219834 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2120399,24.2120399
Longitude : 87.9161496,87.9161496
file name : Image_29022024125949421.png
|
2024-02-29 12:59:49.848824 |
380 |
67219834 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2120399,24.2120399
Longitude : 87.9161496,87.9161496
file name : Image_29022024125939268.png
|
2024-02-29 12:59:39.380569 |
381 |
67230778 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.2120399
Longitude : 87.9161496
file name : Image_29022024133132386.png
|
2024-02-29 13:31:32.500526 |
382 |
67230778 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.2120399
Longitude : 87.9161496
file name : Image_29022024133129696.png
|
2024-02-29 13:31:29.779065 |
383 |
67230778 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.2120399
Longitude : 87.9161496
file name : Image_29022024131445848.png
|
2024-02-29 13:14:45.937706 |
384 |
67230778 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 24.2120399
Longitude : 87.9161496
file name : Image_29022024125930407.png
|
2024-02-29 12:59:30.648875 |
385 |
67246748 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.212057
Longitude : 87.9161722
file name : Image_09012024165257702.png
|
2024-01-09 16:52:57.765442 |
386 |
67246748 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.212057
Longitude : 87.9161722
file name : Image_09012024165254771.png
|
2024-01-09 16:52:54.823176 |
387 |
67246748 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.212057
Longitude : 87.9161722
file name : Image_09012024164924932.png
|
2024-01-09 16:49:24.997818 |
388 |
67246748 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.2120614
Longitude : 87.9161749
file name : Image_09012024160645404.png
|
2024-01-09 16:06:45.464895 |
389 |
67219786 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.2120399,24.2120399
Longitude : 87.9161496,87.9161496
file name : Image_29022024133202802.png
|
2024-02-29 13:32:02.903037 |
390 |
67219786 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.2120399,24.2120399
Longitude : 87.9161496,87.9161496
file name : Image_29022024131414411.png
|
2024-02-29 13:14:14.499509 |
391 |
67219786 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.2120399,24.2120399
Longitude : 87.9161496,87.9161496
file name : Image_29022024125942150.png
|
2024-02-29 12:59:42.343115 |
392 |
67219786 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.2120399,24.2120399
Longitude : 87.9161496,87.9161496
file name : Image_29022024125933334.png
|
2024-02-29 12:59:33.587315 |
393 |
67219786 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.212101666666666,24.212098333333333
Longitude : 87.91618333333332,87.91618833333332
file name : Image_27012024134205899.png
|
2024-01-27 13:42:05.955074 |
394 |
67219786 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2120646,24.2120646
Longitude : 87.9161781,87.9161781
file name : Image_27012024125906565.png
|
2024-01-27 12:59:06.688209 |
395 |
67220280 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.21211333333333,24.21211333333333
Longitude : 87.91622166666666,87.91622166666666
file name : Image_27012024144229245.png
|
2024-01-27 14:42:29.293299 |
396 |
67220280 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.2120568,24.2120568
Longitude : 87.9161814,87.9161814
file name : Image_27012024133920966.png
|
2024-01-27 13:39:21.093716 |
397 |
67220280 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2120638,24.2120638
Longitude : 87.916179,87.916179
file name : Image_27012024125729174.png
|
2024-01-27 12:57:29.252828 |
398 |
67222117 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.212115,24.212119999999995
Longitude : 87.91619,87.91619666666665
file name : Image_27012024145009676.png
|
2024-01-27 14:50:09.72793 |
399 |
67222117 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.212108333333337,24.212108333333337
Longitude : 87.91618166666667,87.91618166666667
file name : Image_27012024141945301.png
|
2024-01-27 14:19:45.352385 |
400 |
67222117 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.212131666666664,24.212131666666664
Longitude : 87.91620666666668,87.91620666666668
file name : Image_27012024141749908.png
|
2024-01-27 14:17:49.96126 |
401 |
67241979 |
Purchase of water testing kit |
50000 |
Purchase of water testing kit1 |
|
-
latitude : 24.212001
Longitude : 87.9159944
file name : Image_14122023165657332.png
|
2023-12-14 16:56:57.382026 |
402 |
67246684 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.2120399
Longitude : 87.9161496
file name : Image_29022024133357864.png
|
2024-02-29 13:33:57.945226 |
403 |
67246684 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.2120399
Longitude : 87.9161496
file name : Image_29022024131231419.png
|
2024-02-29 13:12:31.511558 |
404 |
67246684 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.2120399
Longitude : 87.9161496
file name : Image_29022024130309529.png
|
2024-02-29 13:03:10.250234 |
405 |
56798108 |
Construction of new PCC road from Amahamudi house to Eid Gaha at Jhitkepara |
250000 |
Construction of new PCC road from Amahamudi house to Eid Gaha at Jhitkepara1 |
Roof laid |
-
latitude : 24.2120399,24.2120399
Longitude : 87.9161496,87.9161496
file name : Image_29022024140455604.png
|
2024-02-29 14:04:55.683197 |
406 |
56798108 |
Construction of new PCC road from Amahamudi house to Eid Gaha at Jhitkepara |
250000 |
Construction of new PCC road from Amahamudi house to Eid Gaha at Jhitkepara1 |
Plinth level |
-
latitude : 24.2120399,24.2120399
Longitude : 87.9161496,87.9161496
file name : Image_29022024135936555.png
|
2024-02-29 13:59:36.637794 |
407 |
56798108 |
Construction of new PCC road from Amahamudi house to Eid Gaha at Jhitkepara |
250000 |
Construction of new PCC road from Amahamudi house to Eid Gaha at Jhitkepara1 |
Completion of work |
-
latitude : 24.2120399,24.2120399
Longitude : 87.9161496,87.9161496
file name : Image_29022024134351638.png
|
2024-02-29 13:43:51.720884 |
408 |
56798108 |
Construction of new PCC road from Amahamudi house to Eid Gaha at Jhitkepara |
250000 |
Construction of new PCC road from Amahamudi house to Eid Gaha at Jhitkepara1 |
Completion of work |
-
latitude : 24.2120399,24.2120399
Longitude : 87.9161496,87.9161496
file name : Image_29022024134348629.png
|
2024-02-29 13:43:48.719379 |
409 |
56798108 |
Construction of new PCC road from Amahamudi house to Eid Gaha at Jhitkepara |
250000 |
Construction of new PCC road from Amahamudi house to Eid Gaha at Jhitkepara1 |
Completion of work |
-
latitude : 24.21652,24.21652,24.21652,24.21652
Longitude : 87.92013999999999,87.92013999999999,87.92013999999999,87.92013999999999
file name : Image_27052023103022971.png
|
2023-05-27 10:30:23.073746 |
410 |
67230620 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.2121015
Longitude : 87.9161265
file name : Image_21032024142844100.png
|
2024-03-21 14:28:44.160688 |
411 |
67230620 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.2121015
Longitude : 87.9161258
file name : Image_21032024142522325.png
|
2024-03-21 14:25:22.387043 |
412 |
67230620 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 24.2120813
Longitude : 87.9161482
file name : Image_21032024142202798.png
|
2024-03-21 14:22:02.864006 |
413 |
67246921 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.2120963
Longitude : 87.9161158
file name : Image_31052024153259579.png
|
2024-05-31 15:32:59.656865 |
414 |
67246921 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.2120772
Longitude : 87.9161383
file name : Image_31052024152958026.png
|
2024-05-31 15:29:58.120364 |
415 |
67246921 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.2120914
Longitude : 87.9161176
file name : Image_31052024152627360.png
|
2024-05-31 15:26:27.443255 |
416 |
67224043 |
Repairing of Hall |
350000 |
Repairing of Hall1 |
Roof laid |
-
latitude : 24.19943333333333
Longitude : 87.95434166666668
file name : Image_10092024201954956.png
|
2024-09-10 20:22:03.168993 |
417 |
67224043 |
Repairing of Hall |
350000 |
Repairing of Hall1 |
Plinth level |
-
latitude : 24.1984862
Longitude : 87.9529793
file name : Image_10092024201822084.png
|
2024-09-10 20:20:30.283237 |
418 |
67224043 |
Repairing of Hall |
350000 |
Repairing of Hall1 |
Completion of work |
-
latitude : 24.1984862
Longitude : 87.9529793
file name : Image_10092024201647655.png
|
2024-09-10 20:18:55.827919 |
419 |
67221576 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.212131666666664,24.212131666666664
Longitude : 87.91623833333333,87.91623833333333
file name : Image_29062024120146633.png
|
2024-06-29 12:01:46.713777 |
420 |
67221576 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.2122004,24.2122004
Longitude : 87.9161547,87.9161547
file name : Image_29062024115928442.png
|
2024-06-29 11:59:28.528043 |
421 |
67221576 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2120777,24.2120777
Longitude : 87.9161918,87.9161918
file name : Image_29062024115620727.png
|
2024-06-29 11:56:20.810523 |
422 |
67219444 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.212086,24.212086
Longitude : 87.9161016,87.9161016
file name : Image_01072024125752108.png
|
2024-07-01 12:57:52.212751 |
423 |
67219444 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.2120778,24.2120778,24.2120778
Longitude : 87.9161887,87.9161887,87.9161887
file name : Image_01072024125419272.png
|
2024-07-01 12:54:19.361419 |
424 |
67219444 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2120917,24.2120917
Longitude : 87.9161043,87.9161043
file name : Image_01072024125159581.png
|
2024-07-01 12:51:59.665739 |
425 |
67220374 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.212077,24.212077
Longitude : 87.9161895,87.9161895
file name : Image_02072024104533620.png
|
2024-07-02 10:45:33.695029 |
426 |
67220374 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.212076,24.212076
Longitude : 87.9161892,87.9161892
file name : Image_02072024104118499.png
|
2024-07-02 10:41:18.589292 |
427 |
67220374 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2120855,24.212082
Longitude : 87.9161874,87.9161913
file name : Image_02072024103753323.png
|
2024-07-02 10:37:53.406066 |
428 |
67219115 |
Construction of roads |
250000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.212067,24.212067
Longitude : 87.9161597,87.9161597
file name : Image_13032024122653219.png
|
2024-03-13 12:26:53.303596 |
429 |
67219115 |
Construction of roads |
250000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.2120676,24.2120676,24.2120676
Longitude : 87.9161536,87.9161536,87.9161536
file name : Image_13032024122157338.png
|
2024-03-13 12:21:57.397056 |
430 |
67219115 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2120641,24.2120641,24.2120641
Longitude : 87.9161564,87.9161564,87.9161564
file name : Image_13032024121608995.png
|
2024-03-13 12:16:09.047801 |
431 |
67219115 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2120641,24.2120641,24.2120641
Longitude : 87.9161564,87.9161564,87.9161564
file name : Image_13032024121602476.png
|
2024-03-13 12:16:02.529596 |
432 |
67219115 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2120646,24.2120683,24.2120683
Longitude : 87.9161574,87.9161603,87.9161603
file name : Image_13032024121555832.png
|
2024-03-13 12:15:55.883298 |
433 |
67230676 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.2120662
Longitude : 87.9161548
file name : Image_13032024122702557.png
|
2024-03-13 12:27:02.624602 |
434 |
67230676 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.2120662
Longitude : 87.9161548
file name : Image_13032024122656673.png
|
2024-03-13 12:26:56.751465 |
435 |
67230676 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.2120675
Longitude : 87.9161598
file name : Image_13032024122204135.png
|
2024-03-13 12:22:04.116267 |
436 |
67230676 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.2120675
Longitude : 87.9161598
file name : Image_13032024122200325.png
|
2024-03-13 12:22:00.378023 |
437 |
67230676 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 24.2120661
Longitude : 87.9161541
file name : Image_13032024121605860.png
|
2024-03-13 12:16:05.761739 |
438 |
67230676 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 24.2120661
Longitude : 87.9161541
file name : Image_13032024121559500.png
|
2024-03-13 12:15:59.552055 |
439 |
67221739 |
Construction of roads |
90000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.2120693,24.2120693
Longitude : 87.9161682,87.9161682
file name : Image_23092024170225494.png
|
2024-09-23 17:02:25.600447 |
440 |
67221739 |
Construction of roads |
90000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.2120651,24.2120651
Longitude : 87.9161679,87.9161679
file name : Image_23092024170048040.png
|
2024-09-23 17:00:48.132722 |
441 |
67221739 |
Construction of roads |
90000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.212071,24.2120689
Longitude : 87.9161724,87.9161686
file name : Image_23092024165811455.png
|
2024-09-23 16:58:11.535491 |
442 |
67205426 |
Electricity/Solar Power Installation |
30000 |
Electricity/Solar Power Installation1 |
Roof laid |
-
latitude : 24.2120716
Longitude : 87.9160934
file name : Image_03072024163023860.png
|
2024-07-03 16:30:23.952855 |
443 |
67205426 |
Electricity/Solar Power Installation |
30000 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 24.212067
Longitude : 87.9161866
file name : Image_03072024162212080.png
|
2024-07-03 16:22:12.180351 |
444 |
67205426 |
Electricity/Solar Power Installation |
30000 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 24.212067
Longitude : 87.9161866
file name : Image_03072024162202744.png
|
2024-07-03 16:22:02.843019 |
445 |
67205426 |
Electricity/Solar Power Installation |
30000 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 24.2120698
Longitude : 87.9160847
file name : Image_03072024161646119.png
|
2024-07-03 16:16:46.214587 |
446 |
67205426 |
Electricity/Solar Power Installation |
30000 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 24.2120698
Longitude : 87.9160847
file name : Image_03072024161618129.png
|
2024-07-03 16:16:18.267472 |
447 |
67205253 |
Electricity/Solar Power Installation |
90000 |
Electricity/Solar Power Installation1 |
Roof laid |
-
latitude : 24.2120679
Longitude : 87.916189
file name : Image_03072024162926406.png
|
2024-07-03 16:29:26.502643 |
448 |
67205253 |
Electricity/Solar Power Installation |
90000 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 24.2120675
Longitude : 87.9161863
file name : Image_03072024162154091.png
|
2024-07-03 16:21:54.182808 |
449 |
67205253 |
Electricity/Solar Power Installation |
90000 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 24.2121184
Longitude : 87.9161397
file name : Image_03072024161607104.png
|
2024-07-03 16:16:07.206128 |
450 |
67205467 |
Electricity/Solar Power Installation |
60000 |
Electricity/Solar Power Installation1 |
Roof laid |
-
latitude : 24.212078
Longitude : 87.9160912
file name : Image_03072024163033606.png
|
2024-07-03 16:30:33.712803 |
451 |
67205467 |
Electricity/Solar Power Installation |
60000 |
Electricity/Solar Power Installation1 |
Roof laid |
-
latitude : 24.212078
Longitude : 87.9160912
file name : Image_03072024163028694.png
|
2024-07-03 16:30:28.7897 |
452 |
67205467 |
Electricity/Solar Power Installation |
60000 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 24.2120667
Longitude : 87.9161855
file name : Image_03072024162215825.png
|
2024-07-03 16:22:15.927243 |
453 |
67205467 |
Electricity/Solar Power Installation |
60000 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 24.2120667
Longitude : 87.9161855
file name : Image_03072024162208037.png
|
2024-07-03 16:22:08.338215 |
454 |
67205467 |
Electricity/Solar Power Installation |
60000 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 24.2120647
Longitude : 87.916183
file name : Image_03072024161626809.png
|
2024-07-03 16:16:26.907207 |
455 |
67205467 |
Electricity/Solar Power Installation |
60000 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 24.2120647
Longitude : 87.916183
file name : Image_03072024161651619.png
|
2024-07-03 16:16:51.718373 |
456 |
67205325 |
Electricity/Solar Power Installation |
90000 |
Electricity/Solar Power Installation1 |
Roof laid |
-
latitude : 24.2120709
Longitude : 87.9161952
file name : Image_03072024162931394.png
|
2024-07-03 16:29:31.486316 |
457 |
67205325 |
Electricity/Solar Power Installation |
90000 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 24.2120664
Longitude : 87.9161908
file name : Image_03072024162158925.png
|
2024-07-03 16:21:59.035272 |
458 |
67205325 |
Electricity/Solar Power Installation |
90000 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 24.2120765
Longitude : 87.9160893
file name : Image_03072024161639207.png
|
2024-07-03 16:16:39.624251 |
459 |
67205325 |
Electricity/Solar Power Installation |
90000 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 24.2120765
Longitude : 87.9160893
file name : Image_03072024161613892.png
|
2024-07-03 16:16:14.064463 |
460 |
67221794 |
Construction of roads |
50000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.212153333333337,24.212153333333337
Longitude : 87.91618166666667,87.91618166666667
file name : Image_27012024143525455.png
|
2024-01-27 14:35:25.509436 |
461 |
67221794 |
Construction of roads |
50000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.21209666666667,24.21209666666667
Longitude : 87.91619333333334,87.91619333333334
file name : Image_27012024134243237.png
|
2024-01-27 13:42:43.293787 |
462 |
67221794 |
Construction of roads |
50000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2120646,24.2120646,24.2120646
Longitude : 87.9161781,87.9161781,87.9161781
file name : Image_27012024130002296.png
|
2024-01-27 13:00:02.416004 |
463 |
67230754 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.212193333333335
Longitude : 87.91625333333334
file name : Image_27012024151626194.png
|
2024-01-27 15:16:26.249582 |
464 |
67230754 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.212173333333332
Longitude : 87.91613833333334
file name : Image_27012024151421293.png
|
2024-01-27 15:14:21.354719 |
465 |
67230754 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 24.2120646
Longitude : 87.9161781
file name : Image_27012024130403197.png
|
2024-01-27 13:04:03.299075 |
466 |
67219210 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.212063,24.212063,24.212063,24.212063
Longitude : 87.9161768,87.9161768,87.9161768,87.9161768
file name : Image_29012024162914260.png
|
2024-01-29 16:29:14.347849 |
467 |
67219210 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.2120592,24.2120592,24.2120592
Longitude : 87.9161693,87.9161693,87.9161693
file name : Image_27012024153119655.png
|
2024-01-27 15:31:19.754172 |
468 |
67219210 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.2120781,24.2120781,24.2120781
Longitude : 87.9160653,87.9160653,87.9160653
file name : Image_27012024152915882.png
|
2024-01-27 15:29:15.970801 |
469 |
67219210 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.21216666666667,24.212148333333335
Longitude : 87.91615166666666,87.916225
file name : Image_27012024152157196.png
|
2024-01-27 15:21:57.284532 |
470 |
67219891 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.212039,24.212039
Longitude : 87.9161133,87.9161133
file name : Image_08072024124034256.png
|
2024-07-08 12:40:34.348688 |
471 |
67219891 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.2120655,24.2120655
Longitude : 87.9161873,87.9161873
file name : Image_08072024123328442.png
|
2024-07-08 12:33:28.532052 |
472 |
67219891 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.2120655,24.2120655
Longitude : 87.9161873,87.9161873
file name : Image_08072024123323506.png
|
2024-07-08 12:33:23.595774 |
473 |
67219891 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2120685,24.2120685
Longitude : 87.9161904,87.9161904
file name : Image_08072024122401730.png
|
2024-07-08 12:24:00.778043 |
474 |
67221692 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.2120661,24.2120661
Longitude : 87.9160893,87.9160893
file name : Image_08072024124030409.png
|
2024-07-08 12:40:30.500014 |
475 |
67221692 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.2120659,24.2120659
Longitude : 87.9161896,87.9161896
file name : Image_08072024123318344.png
|
2024-07-08 12:33:18.432854 |
476 |
67221692 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2120702,24.2120702
Longitude : 87.9161873,87.9161873
file name : Image_08072024122409070.png
|
2024-07-08 12:24:09.153968 |
477 |
67221692 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2120702,24.2120702
Longitude : 87.9161873,87.9161873
file name : Image_08072024122418258.png
|
2024-07-08 12:24:18.338415 |
478 |
67220449 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.212058,24.212058
Longitude : 87.9160831,87.9160831
file name : Image_08072024122218063.png
|
2024-07-08 12:22:18.110074 |
479 |
67220449 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.212013333333335,24.21202
Longitude : 87.91618500000001,87.91618833333332
file name : Image_08072024121536848.png
|
2024-07-08 12:15:36.902016 |
480 |
67220449 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2120699,24.2120699
Longitude : 87.9160853,87.9160853
file name : Image_08072024121324766.png
|
2024-07-08 12:13:24.817963 |
481 |
67219512 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.212155,24.212155
Longitude : 87.91620833333333,87.91620833333333
file name : Image_27012024143936915.png
|
2024-01-27 14:39:36.965558 |
482 |
67219512 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.212155,24.212155
Longitude : 87.91622000000001,87.91622000000001
file name : Image_27012024143835236.png
|
2024-01-27 14:38:35.287868 |
483 |
67219512 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.212116666666663,24.212116666666663
Longitude : 87.91619833333334,87.91619333333334
file name : Image_27012024134030329.png
|
2024-01-27 13:40:30.430326 |
484 |
67219512 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2120646,24.2120646
Longitude : 87.9161781,87.9161781
file name : Image_27012024125756363.png
|
2024-01-27 12:57:56.427185 |
485 |
67230590 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.21215833333333
Longitude : 87.91614499999999
file name : Image_27012024144830085.png
|
2024-01-27 14:48:30.135185 |
486 |
67230590 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.212134999999996
Longitude : 87.91619
file name : Image_27012024144549543.png
|
2024-01-27 14:45:49.59315 |
487 |
67230590 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.212136666666666
Longitude : 87.91618500000001
file name : Image_27012024134317671.png
|
2024-01-27 13:43:17.720199 |
488 |
67230590 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 24.2120646
Longitude : 87.9161781
file name : Image_27012024130121262.png
|
2024-01-27 13:01:21.362058 |
489 |
67230802 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.2120658
Longitude : 87.9161692
file name : Image_26092024140032556.png
|
2024-09-26 14:00:32.634844 |
490 |
67230802 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.2120694
Longitude : 87.9161716
file name : Image_26092024135900568.png
|
2024-09-26 13:59:00.652588 |
491 |
67230802 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 24.2120713
Longitude : 87.9161708
file name : Image_26092024135740712.png
|
2024-09-26 13:57:40.785136 |
492 |
67219388 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.212059999999997,24.2120589
Longitude : 87.91621833333332,87.9160855
file name : Image_18072024143011849.png
|
2024-07-18 14:30:11.932559 |
493 |
67219388 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.212059999999997,24.2120589
Longitude : 87.91621833333332,87.9160855
file name : Image_18072024142949504.png
|
2024-07-18 14:29:49.585418 |
494 |
67219388 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.2120784,24.21208
Longitude : 87.9161804,87.9161816
file name : Image_18072024140707800.png
|
2024-07-18 14:07:07.890349 |
495 |
67219388 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.212074,24.212074
Longitude : 87.9161754,87.9161754
file name : Image_18072024135347558.png
|
2024-07-18 13:53:47.645404 |
496 |
67246394 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.2120753
Longitude : 87.916181
file name : Image_18072024143018823.png
|
2024-07-18 14:30:18.912782 |
497 |
67246394 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.2120753
Longitude : 87.916181
file name : Image_18072024142958316.png
|
2024-07-18 14:29:58.429586 |
498 |
67246394 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.2120615
Longitude : 87.9160832
file name : Image_18072024140741632.png
|
2024-07-18 14:07:41.715177 |
499 |
67246394 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.2120763
Longitude : 87.9161781
file name : Image_18072024135442196.png
|
2024-07-18 13:54:42.287257 |
500 |
67247090 |
Drainage Construction |
190420 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.2120743
Longitude : 87.9161739
file name : Image_18072024142954222.png
|
2024-07-18 14:29:54.326134 |
501 |
67247090 |
Drainage Construction |
190420 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.2120743
Longitude : 87.9161739
file name : Image_18072024143015346.png
|
2024-07-18 14:30:15.434614 |
502 |
67247090 |
Drainage Construction |
190420 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.2120758
Longitude : 87.9161773
file name : Image_18072024140826208.png
|
2024-07-18 14:08:26.018762 |
503 |
67247090 |
Drainage Construction |
190420 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.212075
Longitude : 87.9161809
file name : Image_18072024135538039.png
|
2024-07-18 13:55:37.634707 |
504 |
67245790 |
Drainage Construction |
125000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.2120701
Longitude : 87.9161811
file name : Image_18072024143008503.png
|
2024-07-18 14:30:08.583773 |
505 |
67245790 |
Drainage Construction |
125000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.2120701
Longitude : 87.9161811
file name : Image_18072024142945424.png
|
2024-07-18 14:29:45.508562 |
506 |
67245790 |
Drainage Construction |
125000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.212028333333333
Longitude : 87.91620833333333
file name : Image_18072024141948327.png
|
2024-07-18 14:19:48.087442 |
507 |
67245790 |
Drainage Construction |
125000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.2120732
Longitude : 87.9161709
file name : Image_18072024135709342.png
|
2024-07-18 13:57:09.432924 |
508 |
67245679 |
Drainage Construction |
175000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.2120708
Longitude : 87.9161824
file name : Image_18072024142940830.png
|
2024-07-18 14:29:40.927283 |
509 |
67245679 |
Drainage Construction |
175000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.2120772
Longitude : 87.9161813
file name : Image_18072024142034933.png
|
2024-07-18 14:20:35.012617 |
510 |
67245679 |
Drainage Construction |
175000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.2120764
Longitude : 87.9161797
file name : Image_18072024135747978.png
|
2024-07-18 13:57:48.071485 |
511 |
67244621 |
Operation and Maintenance of drinking water supply system |
300000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 24.212054
Longitude : 87.9160808
file name : Image_22072024140217852.png
|
2024-07-22 14:02:17.917795 |
512 |
67244621 |
Operation and Maintenance of drinking water supply system |
300000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 24.212081
Longitude : 87.9161443
file name : Image_22072024135748464.png
|
2024-07-22 13:57:48.526639 |
513 |
67244621 |
Operation and Maintenance of drinking water supply system |
300000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.2120814
Longitude : 87.9161722
file name : Image_22072024135449636.png
|
2024-07-22 13:54:49.808358 |
514 |
67230727 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.2120755
Longitude : 87.9161754
file name : Image_24072024143850085.png
|
2024-07-24 14:38:50.173869 |
515 |
67230727 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.2120599
Longitude : 87.9160832
file name : Image_24072024143454885.png
|
2024-07-24 14:34:54.97765 |
516 |
67230727 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 24.2120601
Longitude : 87.9160828
file name : Image_24072024142953075.png
|
2024-07-24 14:29:53.195957 |
517 |
67247031 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.2120064
Longitude : 87.9160406
file name : Image_31072024180623605.png
|
2024-07-31 18:06:23.697324 |
518 |
67247031 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.2121147
Longitude : 87.9161141
file name : Image_31072024175946553.png
|
2024-07-31 17:59:46.646399 |
519 |
67247031 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.2120489
Longitude : 87.9160946
file name : Image_31072024175521019.png
|
2024-07-31 17:55:21.112975 |
520 |
67246874 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.2119864
Longitude : 87.9160416
file name : Image_31072024180627281.png
|
2024-07-31 18:06:27.371357 |
521 |
67246874 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.2120763
Longitude : 87.9161062
file name : Image_31072024180034465.png
|
2024-07-31 18:00:34.564026 |
522 |
67246874 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.2120098
Longitude : 87.9160676
file name : Image_31072024175527683.png
|
2024-07-31 17:55:27.784236 |
523 |
67230819 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.2120654
Longitude : 87.9161747
file name : Image_21082024170750737.png
|
2024-08-21 17:07:50.824811 |
524 |
67230819 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.212088333333334
Longitude : 87.916165
file name : Image_21082024170554015.png
|
2024-08-21 17:05:54.110243 |
525 |
67230819 |
Drinking water facilities |
175000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 24.2120671
Longitude : 87.9161742
file name : Image_21082024170223622.png
|
2024-08-21 17:02:23.734813 |
526 |
67246322 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.212065
Longitude : 87.9161732
file name : Image_21082024124854658.png
|
2024-08-21 12:48:54.761132 |
527 |
67246322 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.212065
Longitude : 87.9161732
file name : Image_21082024124850334.png
|
2024-08-21 12:48:50.443329 |
528 |
67246322 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.2120646
Longitude : 87.9161755
file name : Image_21082024124330486.png
|
2024-08-21 12:43:30.611444 |
529 |
67246322 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.199173333333338
Longitude : 87.95319833333333
file name : Image_21082024123016296.png
|
2024-08-21 12:30:16.391722 |
530 |
67246974 |
Drainage Construction |
250000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.2120646
Longitude : 87.9161786
file name : Image_21082024124842358.png
|
2024-08-21 12:48:42.468863 |
531 |
67246974 |
Drainage Construction |
250000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.212095
Longitude : 87.9161093
file name : Image_21082024124338584.png
|
2024-08-21 12:43:38.681535 |
532 |
67246974 |
Drainage Construction |
250000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.212095
Longitude : 87.9161093
file name : Image_21082024124334426.png
|
2024-08-21 12:43:34.54806 |
533 |
67246974 |
Drainage Construction |
250000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.2120702
Longitude : 87.9161746
file name : Image_21082024123025973.png
|
2024-08-21 12:30:26.068381 |
534 |
67246974 |
Drainage Construction |
250000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.2120702
Longitude : 87.9161746
file name : Image_21082024123020988.png
|