1 |
34758734 |
CC ROAD UPGREDATION FROM SANKHAIR TO GAROYA |
200000 |
CC ROAD UPGREDATION FROM SANKHAIR TO GAROYA1 |
Plinth level |
-
latitude : 25.44494164,25.44493326,25.44493298
Longitude : 88.68889315,88.68838514,88.68838566
file name : Image_22092021205554804.png
|
2021-09-22 20:55:54.955343 |
2 |
34758734 |
CC ROAD UPGREDATION FROM SANKHAIR TO GAROYA |
200000 |
CC ROAD UPGREDATION FROM SANKHAIR TO GAROYA1 |
Completion of work |
-
latitude : 25.44495674,25.44494837
Longitude : 88.68838442,88.6886602
file name : Image_12092021150701284.png
|
2021-09-12 15:07:01.369504 |
3 |
34758734 |
CC ROAD UPGREDATION FROM SANKHAIR TO GAROYA |
200000 |
CC ROAD UPGREDATION FROM SANKHAIR TO GAROYA1 |
Completion of work |
-
latitude : 25.44495674,25.44494837
Longitude : 88.68838442,88.6886602
file name : Image_12092021150643968.png
|
2021-09-12 15:06:44.063837 |
4 |
34751893 |
CC ROAD FROM HOUSE OF HABIBUR MIAHL TO HOUSE OF CHHAPAR TO TALPUKUR |
250000 |
CC ROAD FROM HOUSE OF HABIBUR MIAHL TO HOUSE OF CHHAPAR TO TALPUKUR1 |
Plinth level |
-
latitude : 25.45029386,25.45028016,25.45027277
Longitude : 88.65788301,88.65806928,88.65791852
file name : Image_15092021155247934.png
|
2021-09-15 15:52:48.04202 |
5 |
34751893 |
CC ROAD FROM HOUSE OF HABIBUR MIAHL TO HOUSE OF CHHAPAR TO TALPUKUR |
250000 |
CC ROAD FROM HOUSE OF HABIBUR MIAHL TO HOUSE OF CHHAPAR TO TALPUKUR1 |
Completion of work |
-
latitude : 25.45030831,25.45030099,25.45027716
Longitude : 88.65790022,88.65805183,88.65791555
file name : Image_09092021160438724.png
|
2021-09-09 16:04:38.825554 |
6 |
34611209 |
CC ROAD FROM MORAM ROAD TO HOBIBOR MIAH HOUSE |
150000 |
CC ROAD FROM MORAM ROAD TO HOBIBOR MIAH HOUSE 1 |
Plinth level |
-
latitude : 25.43156339,25.43172242,25.43155969
Longitude : 88.6601272,88.6601188,88.66016093
file name : Image_15092021155242255.png
|
2021-09-15 15:52:42.37152 |
7 |
34611209 |
CC ROAD FROM MORAM ROAD TO HOBIBOR MIAH HOUSE |
150000 |
CC ROAD FROM MORAM ROAD TO HOBIBOR MIAH HOUSE 1 |
Completion of work |
-
latitude : 25.43158511,25.4318312,25.43152785
Longitude : 88.66009868,88.6600974,88.6601616
file name : Image_09092021160751729.png
|
2021-09-09 16:07:51.839115 |
8 |
47232422 |
CONSTRUCTION OF CC ROAD FROM KANKIT BARMANS HOUSE TO BABLU BARMANS HOUSE |
350000 |
CONSTRUCTION OF CC ROAD FROM KANKIT BARMANS HOUSE TO BABLU BARMANS HOUSE1 |
Plinth level |
-
latitude : 25.45557787,25.45557296
Longitude : 88.66258499,88.66258771
file name : Image_09012023164949465.png
|
2023-01-09 16:49:49.529805 |
9 |
47232422 |
CONSTRUCTION OF CC ROAD FROM KANKIT BARMANS HOUSE TO BABLU BARMANS HOUSE |
350000 |
CONSTRUCTION OF CC ROAD FROM KANKIT BARMANS HOUSE TO BABLU BARMANS HOUSE1 |
Completion of work |
-
latitude : 25.4562755,25.45627881,25.45627855,25.45627855
Longitude : 88.66243367,88.66242563,88.66242572,88.66242572
file name : Image_28122022133618961.png
|
2022-12-28 13:36:18.993354 |
10 |
47235905 |
CONSTRUCTION OF C C ROAD FROM ZP ROAD TO SAMIRUDDIN MIAHS HOUSE AT DEOWANIYAPARA |
175000 |
CONSTRUCTION OF C C ROAD FROM ZP ROAD TO SAMIRUDDIN MIAHS HOUSE AT DEOWANIYAPARA1 |
Plinth level |
-
latitude : 25.4163684,25.41636465,25.41640548,25.41642148
Longitude : 88.64648251,88.64648509,88.6464156,88.64640406
file name : Image_09012023164935975.png
|
2023-01-09 16:49:36.050921 |
11 |
34730258 |
CC ROAD FROM SSK TO FAJLUR RAHAMAN HOUSE |
150000 |
CC ROAD FROM SSK TO FAJLUR RAHAMAN HOUSE1 |
Plinth level |
-
latitude : 25.46069979,25.46069814,25.46068666
Longitude : 88.65270172,88.65281045,88.65270937
file name : Image_22092021151240373.png
|
2021-09-22 15:12:40.468808 |
12 |
34730258 |
CC ROAD FROM SSK TO FAJLUR RAHAMAN HOUSE |
150000 |
CC ROAD FROM SSK TO FAJLUR RAHAMAN HOUSE1 |
Completion of work |
-
latitude : 25.46067774,25.46069531,25.46066869
Longitude : 88.65266403,88.65288205,88.65266651
file name : Image_09092021160708028.png
|
2021-09-09 16:07:08.129829 |
13 |
35105801 |
CC ROAD FROM LAND OF PATIT PABAN DAS TO ZP ROAD |
320000 |
CC ROAD FROM LAND OF PATIT PABAN DAS TO ZP ROAD1 |
Plinth level |
-
latitude : 25.41882126,25.41876089
Longitude : 88.67384179,88.67389612
file name : Image_09092021131756379.png
|
2021-09-09 13:17:56.484599 |
14 |
35105801 |
CC ROAD FROM LAND OF PATIT PABAN DAS TO ZP ROAD |
320000 |
CC ROAD FROM LAND OF PATIT PABAN DAS TO ZP ROAD1 |
Completion of work |
-
latitude : 25.4187404,25.41886138,25.41871081
Longitude : 88.67384812,88.67370061,88.67387675
file name : Image_27082021124259866.png
|
2021-08-27 12:42:59.976725 |
15 |
34742818 |
CC ROAD FROM HOUSE OF NAJIR MIAH TO TRANSFORMAR |
175000 |
CC ROAD FROM HOUSE OF NAJIR MIAH TO TRANSFORMAR1 |
Plinth level |
-
latitude : 25.47471661,25.47474663,25.47469566
Longitude : 88.65547249,88.6556983,88.65544087
file name : Image_20082021181635819.png
|
2021-08-20 18:16:35.919864 |
16 |
34742818 |
CC ROAD FROM HOUSE OF NAJIR MIAH TO TRANSFORMAR |
175000 |
CC ROAD FROM HOUSE OF NAJIR MIAH TO TRANSFORMAR1 |
Completion of work |
-
latitude : 25.47471183,25.47477697
Longitude : 88.65543248,88.65587908
file name : Image_18082021084006316.png
|
2021-08-18 08:40:06.422344 |
17 |
34744542 |
CC ROAD FROM HOUSE OF UNIS ALI TO BOUHAR POND |
110000 |
CC ROAD FROM HOUSE OF UNIS ALI TO BOUHAR POND1 |
Completion of work |
-
latitude : 25.47108232,25.47110124,25.47108939
Longitude : 88.65667553,88.65683728,88.65666831
file name : Image_09092021160739390.png
|
2021-09-09 16:07:39.493363 |
18 |
34749362 |
CC ROAD FROM LAND OF NAJRUL TO HOUSE OF MAMINUL |
245000 |
CC ROAD FROM LAND OF NAJRUL TO HOUSE OF MAMINUL1 |
Completion of work |
-
latitude : 25.46836768,25.46829899
Longitude : 88.66947685,88.66950064
file name : Image_18082021084012806.png
|
2021-08-18 08:40:12.907223 |
19 |
34735012 |
CC ROAD FROM HOUSE OF LAL BABU TO HOUE OF RAHAMAN MIAH |
150000 |
CC ROAD FROM HOUSE OF LAL BABU TO HOUE OF RAHAMAN MIAH1 |
Plinth level |
-
latitude : 25.47590038,25.47603084,25.47592411
Longitude : 88.65111725,88.6510975,88.65113092
file name : Image_15092021155254280.png
|
2021-09-15 15:52:54.424032 |
20 |
34735012 |
CC ROAD FROM HOUSE OF LAL BABU TO HOUE OF RAHAMAN MIAH |
150000 |
CC ROAD FROM HOUSE OF LAL BABU TO HOUE OF RAHAMAN MIAH1 |
Completion of work |
-
latitude : 25.47589411,25.47605547,25.47591717
Longitude : 88.65115457,88.65111869,88.65113883
file name : Image_27082021124254247.png
|
2021-08-27 12:42:54.359768 |
21 |
34688026 |
CC ROAD FROM CC ROAD TO MOHONPURA |
300000 |
CC ROAD FROM CC ROAD TO MOHONPURA1 |
Plinth level |
-
latitude : 25.41585306,25.41591332
Longitude : 88.6717013,88.67187677
file name : Image_27082021124317557.png
|
2021-08-27 12:43:17.658988 |
22 |
34688026 |
CC ROAD FROM CC ROAD TO MOHONPURA |
300000 |
CC ROAD FROM CC ROAD TO MOHONPURA1 |
Completion of work |
-
latitude : 25.41592827,25.41584134,25.41592309
Longitude : 88.67189822,88.671555,88.67188037
file name : Image_18082021084018917.png
|
2021-08-18 08:40:19.023302 |
23 |
34729139 |
CC ROAD FROM TAL PUKUR TO MAHISHAR |
320000 |
CC ROAD FROM TAL PUKUR TO MAHISHAR1 |
Plinth level |
-
latitude : 25.45042647,25.45000343,25.45038967,25.45037621
Longitude : 88.65151149,88.6516732,88.65156408,88.6515693
file name : Image_09092021160701877.png
|
2021-09-09 16:07:01.996004 |
24 |
34729139 |
CC ROAD FROM TAL PUKUR TO MAHISHAR |
320000 |
CC ROAD FROM TAL PUKUR TO MAHISHAR1 |
Completion of work |
-
latitude : 25.45054696,25.45030131,25.45048707
Longitude : 88.65156412,88.65163118,88.65154311
file name : Image_18082021083947497.png
|
2021-08-18 08:39:47.613213 |
25 |
35105275 |
CC ROAD FROM HOUSE OF JARJIS MIAH TO HOUSE OF MAINUDDIN MIAH |
150000 |
CC ROAD FROM HOUSE OF JARJIS MIAH TO HOUSE OF MAINUDDIN MIAH1 |
Completion of work |
-
latitude : 25.43336363,25.43334555,25.43336987
Longitude : 88.66090784,88.66066761,88.66088152
file name : Image_09092021160745579.png
|
2021-09-09 16:07:45.683529 |
26 |
35105275 |
CC ROAD FROM HOUSE OF JARJIS MIAH TO HOUSE OF MAINUDDIN MIAH |
150000 |
CC ROAD FROM HOUSE OF JARJIS MIAH TO HOUSE OF MAINUDDIN MIAH1 |
Completion of work |
-
latitude : 25.43344137,25.43339892,25.43341782
Longitude : 88.66092251,88.6608267,88.66092584
file name : Image_15092021155230662.png
|
2021-09-15 15:52:30.773881 |
27 |
34805106 |
CC ROAD FROM PWD ROAD TO JAME MOSJIT TO HOUSE OF RAHAMAN |
300000 |
CC ROAD FROM PWD ROAD TO JAME MOSJIT TO HOUSE OF RAHAMAN1 |
Completion of work |
-
latitude : 25.45730971,25.45727431,25.45733141
Longitude : 88.67764558,88.6773153,88.67765331
file name : Image_18082021083954066.png
|
2021-08-18 08:39:54.166171 |
28 |
34805106 |
CC ROAD FROM PWD ROAD TO JAME MOSJIT TO HOUSE OF RAHAMAN |
300000 |
CC ROAD FROM PWD ROAD TO JAME MOSJIT TO HOUSE OF RAHAMAN1 |
Plinth level |
-
latitude : 25.45732378,25.45731943,25.45734173
Longitude : 88.67762369,88.67750764,88.6776172
file name : Image_09092021142718493.png
|
2021-09-09 14:27:18.610661 |
29 |
34805106 |
CC ROAD FROM PWD ROAD TO JAME MOSJIT TO HOUSE OF RAHAMAN |
300000 |
CC ROAD FROM PWD ROAD TO JAME MOSJIT TO HOUSE OF RAHAMAN1 |
Completion of work |
-
latitude : 25.45730971,25.45727431,25.45733141
Longitude : 88.67764558,88.6773153,88.67765331
file name : Image_18082021084043570.png
|
2021-08-18 08:40:43.666398 |
30 |
34805953 |
CC ROAD FROM HOUSE ABUL MIAH TO HOUSE OF AINADDIN |
160000 |
CC ROAD FROM HOUSE ABUL MIAH TO HOUSE OF AINADDIN1 |
Plinth level |
-
latitude : 25.45815204,25.45799222,25.45814492
Longitude : 88.67829538,88.67820874,88.67826525
file name : Image_09092021160432734.png
|
2021-09-09 16:04:32.835101 |
31 |
34805953 |
CC ROAD FROM HOUSE ABUL MIAH TO HOUSE OF AINADDIN |
160000 |
CC ROAD FROM HOUSE ABUL MIAH TO HOUSE OF AINADDIN1 |
Completion of work |
-
latitude : 25.45811905,25.45798731,25.45811826
Longitude : 88.67829248,88.67822064,88.67826053
file name : Image_18082021084049811.png
|
2021-08-18 08:40:49.914968 |
32 |
34750678 |
CC ROAD FROM HOUSE OF MAKBUL TO PMGSY ROAD |
300000 |
CC ROAD FROM HOUSE OF MAKBUL TO PMGSY ROAD1 |
Plinth level |
-
latitude : 25.44992359,25.44976155,25.44993436
Longitude : 88.65645408,88.65645199,88.65645929
file name : Image_20082021181615876.png
|
2021-08-20 18:16:15.976038 |
33 |
34750678 |
CC ROAD FROM HOUSE OF MAKBUL TO PMGSY ROAD |
300000 |
CC ROAD FROM HOUSE OF MAKBUL TO PMGSY ROAD1 |
Completion of work |
-
latitude : 25.45016152,25.44980458,25.44993148
Longitude : 88.65644241,88.65645727,88.65646039
file name : Image_18082021083941202.png
|
2021-08-18 08:39:41.300761 |
34 |
34754960 |
CC ROAD FROM CC ROAD TO CHAKASAN VILLAGE |
300000 |
CC ROAD FROM CC ROAD TO CHAKASAN VILLAGE1 |
Plinth level |
-
latitude : 25.444431,25.44427625,25.44446018
Longitude : 88.66578284,88.66568924,88.66575549
file name : Image_09092021160444747.png
|
2021-09-09 16:04:44.845157 |
35 |
34754960 |
CC ROAD FROM CC ROAD TO CHAKASAN VILLAGE |
300000 |
CC ROAD FROM CC ROAD TO CHAKASAN VILLAGE1 |
Completion of work |
-
latitude : 25.444446,25.44444313,25.44434491
Longitude : 88.6657861,88.66576052,88.66568161
file name : Image_18082021084036819.png
|
2021-08-18 08:40:36.930944 |
36 |
34689808 |
CC ROAD FROM SSK SCHOOL TO LAND OF KHAJER MAHALAT |
110000 |
CC ROAD FROM SSK SCHOOL TO LAND OF KHAJER MAHALAT1 |
Plinth level |
-
latitude : 25.4176085,25.41772769,25.41758741
Longitude : 88.69302717,88.69300296,88.69303551
file name : Image_09092021131802532.png
|
2021-09-09 13:18:02.626164 |
37 |
34689808 |
CC ROAD FROM SSK SCHOOL TO LAND OF KHAJER MAHALAT |
110000 |
CC ROAD FROM SSK SCHOOL TO LAND OF KHAJER MAHALAT1 |
Completion of work |
-
latitude : 25.41760883,25.41775736
Longitude : 88.69300673,88.69297736
file name : Image_27082021124311416.png
|
2021-08-27 12:43:11.53065 |
38 |
34738517 |
CC ROAD FROM BASPARA EAST MOSJID TO TRANSFORMAR |
175000 |
CC ROAD FROM BASPARA EAST MOSJID TO TRANSFORMAR1 |
Plinth level |
-
latitude : 25.47475702,25.47477698,25.47475015
Longitude : 88.65594684,88.65613201,88.65594914
file name : Image_15092021155218086.png
|
2021-09-15 15:52:18.200313 |
39 |
34738517 |
CC ROAD FROM BASPARA EAST MOSJID TO TRANSFORMAR |
175000 |
CC ROAD FROM BASPARA EAST MOSJID TO TRANSFORMAR1 |
Completion of work |
-
latitude : 25.47478521,25.47481371,25.47478807
Longitude : 88.65592408,88.65613994,88.6559148
file name : Image_09092021160726572.png
|
2021-09-09 16:07:26.672136 |
40 |
34692881 |
CC ROAD FROM ZP ROAD TO HOUSE OF SANKAR DAS |
175000 |
CC ROAD FROM ZP ROAD TO HOUSE OF SANKAR DAS1 |
Plinth level |
-
latitude : 25.44512241,25.44508301,25.44511971
Longitude : 88.6776728,88.67781186,88.67767414
file name : Image_12092021150638247.png
|
2021-09-12 15:06:38.340294 |
41 |
34692881 |
CC ROAD FROM ZP ROAD TO HOUSE OF SANKAR DAS |
175000 |
CC ROAD FROM ZP ROAD TO HOUSE OF SANKAR DAS1 |
Plinth level |
-
latitude : 25.44512241,25.44508301,25.44511971
Longitude : 88.6776728,88.67781186,88.67767414
file name : Image_12092021150655664.png
|
2021-09-12 15:06:55.752574 |
42 |
34692881 |
CC ROAD FROM ZP ROAD TO HOUSE OF SANKAR DAS |
175000 |
CC ROAD FROM ZP ROAD TO HOUSE OF SANKAR DAS1 |
Completion of work |
-
latitude : 25.4472309,25.4472309,25.4472291
Longitude : 88.6810083,88.6810083,88.681007
file name : Image_09092021142712051.png
|
2021-09-09 14:27:12.156112 |
43 |
34718453 |
CC ROAD FROM HOUSE OF RAMJAN MIAH TO BANSBARI |
320000 |
CC ROAD FROM HOUSE OF RAMJAN MIAH TO BANSBARI1 |
Completion of work |
-
latitude : 25.43768177,25.43765397,25.43767144
Longitude : 88.6797124,88.67989827,88.67970598
file name : Image_22092021151234037.png
|
2021-09-22 15:12:34.154267 |
44 |
34718453 |
CC ROAD FROM HOUSE OF RAMJAN MIAH TO BANSBARI |
320000 |
CC ROAD FROM HOUSE OF RAMJAN MIAH TO BANSBARI1 |
Completion of work |
-
latitude : 25.43768288,25.43766627,25.43767194
Longitude : 88.67971019,88.67989347,88.67973729
file name : Image_12092021150632307.png
|
2021-09-12 15:06:32.414987 |
45 |
34735895 |
CC ROAD FROM HOUSE OF DIJEN ROY TO HOUSE OF ANOWAR ALI |
150000 |
CC ROAD FROM HOUSE OF DIJEN ROY TO HOUSE OF ANOWAR ALI1 |
Completion of work |
-
latitude : 25.47530368,25.47539563,25.475302
Longitude : 88.65135296,88.65151355,88.65135386
file name : Image_09092021160732843.png
|
2021-09-09 16:07:32.947577 |
46 |
34695024 |
CC ROAD FROM CC ROAD TO HOUSE OF FARYAT ALI |
190000 |
CC ROAD FROM CC ROAD TO HOUSE OF FARYAT ALI1 |
Completion of work |
-
latitude : 25.43684394,25.43667138,25.43682503
Longitude : 88.67964179,88.67965853,88.67961651
file name : Image_08102021152842295.png
|
2021-10-08 15:28:42.412789 |
47 |
34695024 |
CC ROAD FROM CC ROAD TO HOUSE OF FARYAT ALI |
190000 |
CC ROAD FROM CC ROAD TO HOUSE OF FARYAT ALI1 |
Plinth level |
-
latitude : 25.43680523,25.43666555,25.43679622
Longitude : 88.67961881,88.67965985,88.67962691
file name : Image_06112021130139095.png
|
2021-11-06 13:01:39.227524 |
48 |
34584601 |
CC ROAD FROM BISWASPUKUR BRIDGE TO HOUSE OF ALO MANDAL |
320000 |
CC ROAD FROM BISWASPUKUR BRIDGE TO HOUSE OF ALO MANDAL1 |
Plinth level |
-
latitude : 25.42205265,25.42201624,25.42202304
Longitude : 88.65270388,88.65278614,88.65271451
file name : Image_15092021155224420.png
|
2021-09-15 15:52:24.534077 |
49 |
34584601 |
CC ROAD FROM BISWASPUKUR BRIDGE TO HOUSE OF ALO MANDAL |
320000 |
CC ROAD FROM BISWASPUKUR BRIDGE TO HOUSE OF ALO MANDAL1 |
Completion of work |
-
latitude : 25.4220302,25.42204525,25.42198814
Longitude : 88.65268552,88.65289174,88.6526921
file name : Image_09092021160720593.png
|
2021-09-09 16:07:20.694792 |
50 |
35156309 |
WATER TESTING |
36000 |
WATER TESTING1 |
Completion of work |
-
latitude : 25.44431438
Longitude : 88.67696965
file name : Image_30122021153511100.png
|
2021-12-30 15:35:11.219021 |
51 |
47227877 |
CONSTRUCTION OF BAMBOO PILLING AT IBRAHIM MIAHS POND |
30000 |
CONSTRUCTION OF BAMBOO PILLING AT IBRAHIM MIAHS POND1 |
Completion of work |
-
latitude : 25.41530511,25.41527853,25.41531006
Longitude : 88.66851984,88.66838539,88.66850682
file name : Image_18022023222040538.png
|
2023-02-18 22:20:40.606328 |
52 |
47228671 |
CONSTRUCTION OF BAMBOO PILLING AT MAHAN KURA POND |
30000 |
CONSTRUCTION OF BAMBOO PILLING AT MAHAN KURA POND1 |
Completion of work |
-
latitude : 25.41620418,25.41626831,25.41616847
Longitude : 88.67182425,88.67180804,88.67183646
file name : Image_24012023164504152.png
|
2023-01-24 16:45:04.240777 |
53 |
46643082 |
CONSTRUCTION OF PUCCA DRAIN FROM PAGLA PUKUR TO LAND OF MOSTAFA SARKAR VIA MADRASHA AT MAJHA PARA |
169000 |
CONSTRUCTION OF PUCCA DRAIN FROM PAGLA PUKUR TO LAND OF MOSTAFA SARKAR VIA MADRASHA AT MAJHA PARA1 |
Completion of work |
-
latitude : 25.41275003,25.41274999
Longitude : 88.66979461,88.66979466
file name : Image_16032022194937379.png
|
2022-03-16 19:49:37.496193 |
54 |
47229032 |
CONSTRUCTION OF BAMBOO PILLING AT PAGLA PUKUR |
30000 |
CONSTRUCTION OF BAMBOO PILLING AT PAGLA PUKUR1 |
Plinth level |
-
latitude : 25.41271771,25.41277825
Longitude : 88.66972098,88.66975258
file name : Image_10052022153501640.png
|
2022-05-10 15:35:01.746678 |
55 |
47229032 |
CONSTRUCTION OF BAMBOO PILLING AT PAGLA PUKUR |
30000 |
CONSTRUCTION OF BAMBOO PILLING AT PAGLA PUKUR1 |
Completion of work |
-
latitude : 25.41303296,25.4129932
Longitude : 88.66984215,88.66985791
file name : Image_26042022160557061.png
|
2022-04-26 16:05:57.171991 |
56 |
47228392 |
CONSTRUCTION OF BAMBOO PILLING AT LATE KANU DASS POND |
30000 |
CONSTRUCTION OF BAMBOO PILLING AT LATE KANU DASS POND1 |
Completion of work |
-
latitude : 25.41832979,25.41842888
Longitude : 88.67407245,88.67405765
file name : Image_26042022160616073.png
|
2022-04-26 16:06:16.195047 |
57 |
47229250 |
CONSTRUCTION OF BAMBOO PILLING AT TABAUDDIN SARKARS KURI |
30000 |
CONSTRUCTION OF BAMBOO PILLING AT TABAUDDIN SARKARS KURI1 |
Plinth level |
-
latitude : 25.4141024,25.41410143
Longitude : 88.6707906,88.67071611
file name : Image_10052022153508141.png
|
2022-05-10 15:35:08.250069 |
58 |
47229250 |
CONSTRUCTION OF BAMBOO PILLING AT TABAUDDIN SARKARS KURI |
30000 |
CONSTRUCTION OF BAMBOO PILLING AT TABAUDDIN SARKARS KURI1 |
Completion of work |
-
latitude : 25.41410514,25.41410032
Longitude : 88.67072386,88.67072092
file name : Image_26042022160609801.png
|
2022-04-26 16:06:09.922069 |
59 |
47228075 |
CONSTRUCTION OF BAMBOO PILLING AT KALI TALA PUKUR |
50000 |
CONSTRUCTION OF BAMBOO PILLING AT KALI TALA PUKUR1 |
Plinth level |
-
latitude : 25.41422643,25.41424658
Longitude : 88.671118,88.67116694
file name : Image_10052022153455321.png
|
2022-05-10 15:34:55.461975 |
60 |
47228075 |
CONSTRUCTION OF BAMBOO PILLING AT KALI TALA PUKUR |
50000 |
CONSTRUCTION OF BAMBOO PILLING AT KALI TALA PUKUR1 |
Completion of work |
-
latitude : 25.41429332,25.41422191,25.41419277
Longitude : 88.67149832,88.67110435,88.67106624
file name : Image_26042022160603131.png
|
2022-04-26 16:06:03.272046 |
61 |
47227661 |
CONSTRUCTION OF BAMBOO PILLING AT DURGA TALA PUKUR FROM GOUTAMS HOUSE TO SUBIRS HOUSE |
30000 |
CONSTRUCTION OF BAMBOO PILLING AT DURGA TALA PUKUR FROM GOUTAMS HOUSE TO SUBIRS HOUSE1 |
Completion of work |
-
latitude : 25.42017162,25.4202573
Longitude : 88.66731596,88.66738564
file name : Image_26042022160622500.png
|
2022-04-26 16:06:22.589987 |
62 |
39084627 |
Construction of Roof Top rain water harvesting system at Ashokegram GP office |
710134 |
Construction of Roof Top rain water harvesting system at Ashokegram GP office1 |
Completion of work |
-
latitude : 25.4439956
Longitude : 88.6769786
file name : Image_08042022144122154.png
|
2022-04-08 14:41:22.298118 |
63 |
47232872 |
CONSTRUCTION OF C C ROAD FROM AMCHHARS HOUSE TO TAIMUR HOUSE AT SARKARPARA |
350000 |
CONSTRUCTION OF C C ROAD FROM AMCHHARS HOUSE TO TAIMUR HOUSE AT SARKARPARA1 |
Plinth level |
-
latitude : 25.43543077,25.4355058
Longitude : 88.66085487,88.66082995
file name : Image_10052022153449149.png
|
2022-05-10 15:34:49.279713 |
64 |
47232872 |
CONSTRUCTION OF C C ROAD FROM AMCHHARS HOUSE TO TAIMUR HOUSE AT SARKARPARA |
350000 |
CONSTRUCTION OF C C ROAD FROM AMCHHARS HOUSE TO TAIMUR HOUSE AT SARKARPARA1 |
Completion of work |
-
latitude : 25.43543295,25.43555332
Longitude : 88.66085026,88.66080583
file name : Image_27042022125144210.png
|
2022-04-27 12:51:44.330428 |
65 |
47234699 |
CONSTRUCTION OF C C ROAD FROM BANSHPARA TRANSFORMAR TO LOKCHHER ALIS HOUSE |
150000 |
CONSTRUCTION OF C C ROAD FROM BANSHPARA TRANSFORMAR TO LOKCHHER ALIS HOUSE1 |
Plinth level |
-
latitude : 25.47485083,25.47512321,25.47524033
Longitude : 88.65591564,88.65584325,88.65582067
file name : Image_31052022151520665.png
|
2022-05-31 15:15:20.759247 |
66 |
47234699 |
CONSTRUCTION OF C C ROAD FROM BANSHPARA TRANSFORMAR TO LOKCHHER ALIS HOUSE |
150000 |
CONSTRUCTION OF C C ROAD FROM BANSHPARA TRANSFORMAR TO LOKCHHER ALIS HOUSE1 |
Plinth level |
-
latitude : 25.47483748,25.47472864
Longitude : 88.6561805,88.65614647
file name : Image_10052022153528213.png
|
2022-05-10 15:35:28.346559 |
67 |
46639385 |
CONSTRUCTION OF PUCCA DRAIN FROM GOFFAR MOULANAS HOUSE TO SHALLUKKURI POND |
239000 |
CONSTRUCTION OF PUCCA DRAIN FROM GOFFAR MOULANAS HOUSE TO SHALLUKKURI POND1 |
Plinth level |
-
latitude : 25.46978846,25.46978455
Longitude : 88.66050384,88.66049116
file name : Image_18052022130558475.png
|
2022-05-18 13:05:58.56715 |
68 |
46642732 |
CONSTRUCTION OF PUCCA DRAIN FROM JATIN ROYS HOUSE TO TRANS FORMER |
219000 |
CONSTRUCTION OF PUCCA DRAIN FROM JATIN ROYS HOUSE TO TRANS FORMER1 |
Plinth level |
-
latitude : 25.47233835,25.47231458
Longitude : 88.65270811,88.65264407
file name : Image_16062022132415914.png
|
2022-06-16 13:24:16.016383 |
69 |
46642732 |
CONSTRUCTION OF PUCCA DRAIN FROM JATIN ROYS HOUSE TO TRANS FORMER |
219000 |
CONSTRUCTION OF PUCCA DRAIN FROM JATIN ROYS HOUSE TO TRANS FORMER1 |
Plinth level |
-
latitude : 25.47233109,25.47228475
Longitude : 88.65274666,88.65263855
file name : Image_10052022153534995.png
|
2022-05-10 15:35:35.14873 |
70 |
46642179 |
CONSTRUCTION OF PUCCA DRAIN FROM KAILASH BARMANS POND TO PURANO LAXMI MANDIR |
229000 |
CONSTRUCTION OF PUCCA DRAIN FROM KAILASH BARMANS POND TO PURANO LAXMI MANDIR1 |
Plinth level |
-
latitude : 25.4099457,25.40991077
Longitude : 88.68620338,88.68614176
file name : Image_16062022132745670.png
|
2022-06-16 13:27:45.766 |
71 |
46641815 |
CONSTRUCTION OF PUCCA DRAIN FROM BORO PUKUR TO ALTAP ALIS HOUSE |
264000 |
CONSTRUCTION OF PUCCA DRAIN FROM BORO PUKUR TO ALTAP ALIS HOUSE1 |
Completion of work |
-
latitude : 25.43033575,25.43034459,25.43032931
Longitude : 88.67634674,88.67635293,88.67635881
file name : Image_27042022145103773.png
|
2022-04-27 14:51:03.912682 |
72 |
46642446 |
CONSTRUCTION OF PUCCA DRAIN FROM MOMTAJ MIAHS HOUSE TO RULAMINS HOUSE AT SARKAR PARA |
169000 |
CONSTRUCTION OF PUCCA DRAIN FROM MOMTAJ MIAHS HOUSE TO RULAMINS HOUSE AT SARKAR PARA1 |
Plinth level |
-
latitude : 25.42170599,25.42167998
Longitude : 88.64764448,88.64768553
file name : Image_16062022132517731.png
|
2022-06-16 13:25:17.825469 |
73 |
46641527 |
CONSTRUCTION OF PUCCA DRAIN TRANSFARMER TO SALANGAHAR |
179000 |
CONSTRUCTION OF PUCCA DRAIN TRANSFARMER TO SALANGAHAR1 |
Plinth level |
-
latitude : 25.44309392,25.4430956
Longitude : 88.67443224,88.67443533
file name : Image_16062022132641112.png
|
2022-06-16 13:26:41.203866 |
74 |
46641425 |
CONSTRUCTION OF PUCCA DRAIN FROM PIR PUKUR TO AJAMDIGHI CANAL |
379000 |
CONSTRUCTION OF PUCCA DRAIN FROM PIR PUKUR TO AJAMDIGHI CANAL1 |
Plinth level |
-
latitude : 25.44407678,25.44905776,25.4490588,25.44905424,25.44905424,25.44905102
Longitude : 88.67696529,88.65676517,88.65675298,88.65675718,88.65675718,88.65675876
file name : Image_10052022153514751.png
|
2022-05-10 15:35:14.949649 |
75 |
46641028 |
CONSTRUCTION OF PUCCA DRAIN FROM PURBA PARA MOSJID TO AHED ALIS HOUSE |
394000 |
CONSTRUCTION OF PUCCA DRAIN FROM PURBA PARA MOSJID TO AHED ALIS HOUSE1 |
Completion of work |
-
latitude : 25.45847548,25.45847118,25.45847069,25.45847068,25.45847069,25.45847057
Longitude : 88.67836956,88.67839065,88.67839165,88.67839168,88.67839239,88.67839284
file name : Image_27042022145116794.png
|
2022-04-27 14:51:16.910599 |
76 |
46641028 |
CONSTRUCTION OF PUCCA DRAIN FROM PURBA PARA MOSJID TO AHED ALIS HOUSE |
394000 |
CONSTRUCTION OF PUCCA DRAIN FROM PURBA PARA MOSJID TO AHED ALIS HOUSE1 |
Completion of work |
-
latitude : 25.45847548,25.45847118,25.45847069,25.45847068,25.45847069,25.45847057
Longitude : 88.67836956,88.67839065,88.67839165,88.67839168,88.67839239,88.67839284
file name : Image_27042022145110266.png
|
2022-04-27 14:51:10.395584 |
77 |
46640106 |
CONSTRUCTION OF PUCCA DRAIN FROM FARAJ ALIS HOUSE TO PMGSY ROAD |
364000 |
CONSTRUCTION OF PUCCA DRAIN FROM FARAJ ALIS HOUSE TO PMGSY ROAD1 |
Plinth level |
-
latitude : 25.4608356,25.46115974
Longitude : 88.6632282,88.65349442
file name : Image_16062022132847590.png
|
2022-06-16 13:28:47.687769 |
78 |
46640106 |
CONSTRUCTION OF PUCCA DRAIN FROM FARAJ ALIS HOUSE TO PMGSY ROAD |
364000 |
CONSTRUCTION OF PUCCA DRAIN FROM FARAJ ALIS HOUSE TO PMGSY ROAD1 |
Completion of work |
-
latitude : 25.46118842,25.46117356
Longitude : 88.65334141,88.65350771
file name : Image_18052022150610088.png
|
2022-05-18 15:06:10.196285 |
79 |
46640106 |
CONSTRUCTION OF PUCCA DRAIN FROM FARAJ ALIS HOUSE TO PMGSY ROAD |
364000 |
CONSTRUCTION OF PUCCA DRAIN FROM FARAJ ALIS HOUSE TO PMGSY ROAD1 |
Completion of work |
-
latitude : 25.46118842,25.46117356
Longitude : 88.65334141,88.65350771
file name : Image_18052022150616733.png
|
2022-05-18 15:06:16.83491 |
80 |
46641952 |
CONSTRUCTION OF PUCCA DRAIN FROM IYASIN MIAHS HOUSE TOAFA MIAHS HOUSE |
169000 |
CONSTRUCTION OF PUCCA DRAIN FROM IYASIN MIAHS HOUSE TOAFA MIAHS HOUSE1 |
Plinth level |
-
latitude : 25.43657513,25.43657228
Longitude : 88.67148669,88.67148208
file name : Image_22032023094227128.png
|
2023-03-22 09:42:27.185993 |
81 |
46641952 |
CONSTRUCTION OF PUCCA DRAIN FROM IYASIN MIAHS HOUSE TOAFA MIAHS HOUSE |
169000 |
CONSTRUCTION OF PUCCA DRAIN FROM IYASIN MIAHS HOUSE TOAFA MIAHS HOUSE1 |
Plinth level |
-
latitude : 25.43656083,25.43660746,25.43660482
Longitude : 88.67149542,88.67145206,88.67144874
file name : Image_23022023170842460.png
|
2023-02-23 17:08:42.517138 |
82 |
46642269 |
CONSTRUCTION OF PUCCA DRAIN FROM GHORAGARI PUKUR TO KHARIJUL MIAHS HOUSE |
219000 |
CONSTRUCTION OF PUCCA DRAIN FROM GHORAGARI PUKUR TO KHARIJUL MIAHS HOUSE1 |
Completion of work |
-
latitude : 25.41868577,25.41857532,25.41870415
Longitude : 88.69190347,88.691899,88.69186712
file name : Image_01032023150300718.png
|
2023-03-01 15:03:00.785155 |
83 |
46643491 |
CONSTRUCTION OF PUCCA DRAIN AROUND THE GOKULPUR BAZAR |
343000 |
CONSTRUCTION OF PUCCA DRAIN AROUND THE GOKULPUR BAZAR1 |
Completion of work |
-
latitude : 25.4147114,25.414717,25.4147429
Longitude : 88.6718958,88.67191,88.6719889
file name : Image_18022023222052665.png
|
2023-02-18 22:20:52.735972 |
84 |
46643311 |
CONSTRUCTION OF PUCCA DRAIN FROM HOUSE OF MAIDUR SARKAR TO BIPULS LAND |
169000 |
CONSTRUCTION OF PUCCA DRAIN FROM HOUSE OF MAIDUR SARKAR TO BIPULS LAND1 |
Completion of work |
-
latitude : 25.42124093,25.42130379,25.42130379,25.4213049,25.42130182
Longitude : 88.667559,88.66754754,88.66754754,88.66754653,88.66754641
file name : Image_24012023164454333.png
|
2023-01-24 16:44:54.410979 |
85 |
46643311 |
CONSTRUCTION OF PUCCA DRAIN FROM HOUSE OF MAIDUR SARKAR TO BIPULS LAND |
169000 |
CONSTRUCTION OF PUCCA DRAIN FROM HOUSE OF MAIDUR SARKAR TO BIPULS LAND1 |
Completion of work |
-
latitude : 25.42123777,25.42134931,25.42122652
Longitude : 88.66763068,88.66755117,88.66761891
file name : Image_12022023135457496.png
|
2023-02-12 13:54:57.56566 |
86 |
46642554 |
CONSTRUCTION OF PUCCA DRAIN FROM ZP ROAD TO MAMINULS HOUSE AT KISTOPUR |
189000 |
CONSTRUCTION OF PUCCA DRAIN FROM ZP ROAD TO MAMINULS HOUSE AT KISTOPUR1 |
Completion of work |
-
latitude : 25.42191106,25.42197786,25.42197518
Longitude : 88.63969999,88.63968739,88.63969369
file name : Image_13022023142150064.png
|
2023-02-13 14:21:50.1328 |
87 |
46639794 |
CONSTRUCTION OF PUCCA DRAIN FROM MOSJID TO GIYASUDDINS HOUSE AT TANTIKURI |
239000 |
CONSTRUCTION OF PUCCA DRAIN FROM MOSJID TO GIYASUDDINS HOUSE AT TANTIKURI1 |
Completion of work |
-
latitude : 25.47023609,25.47020554
Longitude : 88.67189903,88.67191043
file name : Image_13012023154414037.png
|
2023-01-13 15:44:14.111865 |
88 |
46642060 |
CONSTRUCTION OF PUCCA DRAIN FROM KASHEM MORE MOSJID TO MANNAN ALIS HOUSE |
409000 |
CONSTRUCTION OF PUCCA DRAIN FROM KASHEM MORE MOSJID TO MANNAN ALIS HOUSE1 |
Completion of work |
-
latitude : 25.4638656,25.4638631
Longitude : 88.6530296,88.6530264
file name : Image_13012023154419481.png
|
2023-01-13 15:44:19.549521 |
89 |
46641661 |
CONSTRUCTION OF PUCCA DRAIN FROM ALAUDDIN SHAHS HOUSE TO CULVERT |
269000 |
CONSTRUCTION OF PUCCA DRAIN FROM ALAUDDIN SHAHS HOUSE TO CULVERT1 |
Plinth level |
-
latitude : 25.43773313,25.43773295,25.43773129,25.43773129,25.43773129
Longitude : 88.67963396,88.67963697,88.67963815,88.67963815,88.67963815
file name : Image_03022023181906654.png
|
2023-02-03 18:19:06.723516 |
90 |
46641661 |
CONSTRUCTION OF PUCCA DRAIN FROM ALAUDDIN SHAHS HOUSE TO CULVERT |
269000 |
CONSTRUCTION OF PUCCA DRAIN FROM ALAUDDIN SHAHS HOUSE TO CULVERT1 |
Completion of work |
-
latitude : 25.43773012,25.437732,25.43773303
Longitude : 88.67963154,88.67963611,88.67963839
file name : Image_30122022222421163.png
|
2022-12-30 22:24:21.238708 |
91 |
46641661 |
CONSTRUCTION OF PUCCA DRAIN FROM ALAUDDIN SHAHS HOUSE TO CULVERT |
269000 |
CONSTRUCTION OF PUCCA DRAIN FROM ALAUDDIN SHAHS HOUSE TO CULVERT1 |
Completion of work |
-
latitude : 25.43892938,25.43884205,25.43886012
Longitude : 88.67976891,88.6797967,88.67977695
file name : Image_02022023124342898.png
|
2023-02-02 12:43:43.007723 |
92 |
66178113 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 25.41246879,25.41249211,25.41248393
Longitude : 88.66969602,88.66976556,88.66976787
file name : Image_02022023164433495.png
|
2023-02-02 16:44:33.563541 |
93 |
66178113 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 25.41237324,25.41241887,25.41244709
Longitude : 88.66979244,88.66969411,88.66977298
file name : Image_02022023124403323.png
|
2023-02-02 12:44:03.407695 |
94 |
47244887 |
PURCHASES OF TUBEWELL MATERIAL |
700000 |
PURCHASES OF TUBEWELL MATERIAL9 |
Plinth level |
-
latitude : 25.4439725
Longitude : 88.6770132
file name : Image_16062022132949269.png
|
2022-06-16 13:29:49.376477 |
95 |
47244887 |
PURCHASES OF TUBEWELL MATERIAL |
700000 |
PURCHASES OF TUBEWELL MATERIAL9 |
Completion of work |
-
latitude : 25.4440475
Longitude : 88.6769797
file name : Image_18052022150603723.png
|
2022-05-18 15:06:03.808714 |
96 |
57126387 |
INSTALATION OF MARK II WITH PLAT FORM INFRONT OF BIPAD BARMAN HOUSE AT PURBABISHNUPUR |
124000 |
INSTALATION OF MARK II WITH PLAT FORM INFRONT OF BIPAD BARMAN HOUSE AT PURBABISHNUPUR1 |
Plinth level |
-
latitude : 25.45807464
Longitude : 88.67166776
file name : Image_29092023104614427.png
|
2023-09-29 10:46:14.483704 |
97 |
57126387 |
INSTALATION OF MARK II WITH PLAT FORM INFRONT OF BIPAD BARMAN HOUSE AT PURBABISHNUPUR |
124000 |
INSTALATION OF MARK II WITH PLAT FORM INFRONT OF BIPAD BARMAN HOUSE AT PURBABISHNUPUR1 |
Completion of work |
-
latitude : 25.45902022
Longitude : 88.67208348
file name : Image_26052023102552369.png
|
2023-05-26 10:25:52.436599 |
98 |
46763441 |
INSTALATION OF NAPKIN VENDING MACHINE AT ASHOKGRAM HIGH SCHOOL |
60000 |
INSTALATION OF NAPKIN VENDING MACHINE AT ASHOKGRAM HIGH SCHOOL 1 |
Completion of work |
-
latitude : 25.44321719
Longitude : 88.6769461
file name : Image_27062022131947989.png
|
2022-06-27 13:19:48.079716 |
99 |
65180693 |
Constraction of Bamboo piling at pagla Pukur Gokul pur |
81083 |
Constraction of Bamboo piling at pagla Pukur Gokul pur1 |
Completion of work |
-
latitude : 25.41310846,25.41308156,25.41308156,25.41308156,25.41308156,25.41307977
Longitude : 88.669889,88.66992404,88.66992404,88.66992404,88.66992404,88.66993211
file name : Image_19102022154744657.png
|
2022-10-19 15:47:44.731477 |
100 |
65180693 |
Constraction of Bamboo piling at pagla Pukur Gokul pur |
81083 |
Constraction of Bamboo piling at pagla Pukur Gokul pur1 |
Plinth level |
-
latitude : 25.41305925,25.41304984
Longitude : 88.66984034,88.6699298
file name : Image_01112022135231343.png
|
2022-11-01 13:52:31.420877 |
101 |
65180693 |
Constraction of Bamboo piling at pagla Pukur Gokul pur |
81083 |
Constraction of Bamboo piling at pagla Pukur Gokul pur1 |
Completion of work |
-
latitude : 25.41426618,25.4147086
Longitude : 88.6711957,88.671852
file name : Image_19102022095205521.png
|
2022-10-19 09:52:05.615622 |
102 |
65181074 |
CONS OF BAMBOO PILING AT KALITALA PUKUR GOKUL PUR |
60848 |
CONS OF BAMBOO PILING AT KALITALA PUKUR GOKUL PUR1 |
Completion of work |
-
latitude : 25.41425023,25.41424647
Longitude : 88.67138075,88.67127659
file name : Image_19102022154740134.png
|
2022-10-19 15:47:40.214818 |
103 |
65180980 |
CONS OF BAMBOO PILING LATE KANU DAS POND AT GOKULPUR |
50135 |
CONS OF BAMBOO PILING LATE KANU DAS POND AT GOKULPUR1 |
Completion of work |
-
latitude : 25.41824778,25.41827301,25.41827301,25.41827301,25.41827989,25.41832023
Longitude : 88.67411604,88.67409423,88.67409423,88.67409423,88.67409424,88.67409161
file name : Image_19102022154749468.png
|
2022-10-19 15:47:49.563125 |
104 |
64261067 |
REPAIRING AND RENOVATION OF HAZIPUR ICDS CENTER AT CHAKAHAR |
150000 |
REPAIRING AND RENOVATION OF HAZIPUR ICDS CENTER AT CHAKAHAR1 |
Completion of work |
-
latitude : 25.47450871
Longitude : 88.64996368
file name : Image_28122022133613773.png
|
2022-12-28 13:36:13.806447 |
105 |
47234913 |
CONSTRUCTION OF C C ROAD FROM BOUHAR CC ROAD TO MANNAN ALIS HOUSE |
200000 |
CONSTRUCTION OF C C ROAD FROM BOUHAR CC ROAD TO MANNAN ALIS HOUSE1 |
Completion of work |
-
latitude : 25.47111536,25.4711178
Longitude : 88.6564393,88.65661775
file name : Image_13122022151619685.png
|
2022-12-13 15:16:19.744772 |
106 |
47236170 |
CONSTRUCTION OF C C ROAD AROUND THE ASHOKGRAM HIGH SCHOOL FIELD |
350000 |
CONSTRUCTION OF C C ROAD AROUND THE ASHOKGRAM HIGH SCHOOL FIELD1 |
Plinth level |
-
latitude : 25.4438553,25.4438628
Longitude : 88.6769916,88.6769791
file name : Image_24012023164459310.png
|
2023-01-24 16:44:59.387594 |
107 |
47236170 |
CONSTRUCTION OF C C ROAD AROUND THE ASHOKGRAM HIGH SCHOOL FIELD |
350000 |
CONSTRUCTION OF C C ROAD AROUND THE ASHOKGRAM HIGH SCHOOL FIELD1 |
Completion of work |
-
latitude : 25.4438117,25.4433025
Longitude : 88.6770114,88.6770865
file name : Image_13012023154425466.png
|
2023-01-13 15:44:25.56925 |
108 |
46645241 |
CONSTRUCTION OF WATER TUNK AT BANPUKUR MORE NEAR SSK |
295000 |
CONSTRUCTION OF WATER TUNK AT BANPUKUR MORE NEAR SSK1 |
Completion of work |
-
latitude : 25.42482475
Longitude : 88.65621343
file name : Image_28012023111738988.png
|
2023-01-28 11:17:39.052747 |
109 |
57042914 |
DRINKING WATER TESTING PURPOSE |
70000 |
DRINKING WATER TESTING PURPOSE1 |
Completion of work |
-
latitude : 25.43716005
Longitude : 88.67228552
file name : Image_02022023124309686.png
|
2023-02-02 12:43:09.760144 |
110 |
56821243 |
REPAIRING OF ROAD WITH BAMBOO PILLING AT HOPNA KUDI POND SIDE AT GOKULPUR ADIBASHI PARA |
45000 |
REPAIRING OF ROAD WITH BAMBOO PILLING AT HOPNA KUDI POND SIDE AT GOKULPUR ADIBASHI PARA1 |
Completion of work |
-
latitude : 25.41578941,25.41584259,25.41584259
Longitude : 88.67194331,88.67191229,88.67191229
file name : Image_22032023143226386.png
|
2023-03-22 14:32:26.445153 |
111 |
64261157 |
PROTECTION OF EXISTING CC ROAD WITH BAMBOO PILLING WORK BESIDE TALPUKUR AT NILHARI |
105000 |
PROTECTION OF EXISTING CC ROAD WITH BAMBOO PILLING WORK BESIDE TALPUKUR AT NILHARI1 |
Plinth level |
-
latitude : 25.42478617,25.42478789,25.42476974
Longitude : 88.65622298,88.65613791,88.65622164
file name : Image_10022023142517010.png
|
2023-02-10 14:25:17.077756 |
112 |
64261157 |
PROTECTION OF EXISTING CC ROAD WITH BAMBOO PILLING WORK BESIDE TALPUKUR AT NILHARI |
105000 |
PROTECTION OF EXISTING CC ROAD WITH BAMBOO PILLING WORK BESIDE TALPUKUR AT NILHARI1 |
Completion of work |
-
latitude : 25.42477652,25.42478082,25.42478071,25.42477419
Longitude : 88.65619734,88.65608236,88.65606496,88.65617919
file name : Image_07022023152431396.png
|
2023-02-07 15:24:31.470374 |
113 |
46642835 |
CONSTRUCTION OF PUCCA DRAIN FROM PRODIP ROYS HOUSE TO NITAI ROYS LAND |
319000 |
CONSTRUCTION OF PUCCA DRAIN FROM PRODIP ROYS HOUSE TO NITAI ROYS LAND1 |
Plinth level |
-
latitude : 25.47082185,25.47082463
Longitude : 88.65398051,88.65398201
file name : Image_22032023143230008.png
|
2023-03-22 14:32:30.068315 |
114 |
47236467 |
CC ROAD UPGRADATION BESIDE NIRANJANS HOUSE |
50000 |
CC ROAD UPGRADATION BESIDE NIRANJANS HOUSE 1 |
Completion of work |
-
latitude : 25.44303117,25.44303117,25.44303117,25.44303117,25.4430261,25.4430261
Longitude : 88.67595093,88.67595093,88.67595093,88.67595093,88.67595404,88.67595404
file name : Image_09022023131718608.png
|
2023-02-09 13:17:18.669792 |
115 |
47236467 |
CC ROAD UPGRADATION BESIDE NIRANJANS HOUSE |
50000 |
CC ROAD UPGRADATION BESIDE NIRANJANS HOUSE 1 |
Completion of work |
-
latitude : 25.44301338,25.44301338,25.44301338
Longitude : 88.67595197,88.67595197,88.67595197
file name : Image_09022023131724768.png
|
2023-02-09 13:17:24.831509 |
116 |
47236882 |
CC ROAD UPGRADATION FROM ICHHAB ALIS HOUSE TO MIJANUR SARKARS HOUSE VIA SAHABAT ALIS HOUSE |
200000 |
CC ROAD UPGRADATION FROM ICHHAB ALIS HOUSE TO MIJANUR SARKARS HOUSE VIA SAHABAT ALIS HOUSE1 |
Plinth level |
-
latitude : 25.43728283,25.43726202,25.43728711,25.43728711,25.43729386
Longitude : 88.6791705,88.67923312,88.67915507,88.67915507,88.67915585
file name : Image_28012023111757579.png
|
2023-01-28 11:17:57.639419 |
117 |
47236882 |
CC ROAD UPGRADATION FROM ICHHAB ALIS HOUSE TO MIJANUR SARKARS HOUSE VIA SAHABAT ALIS HOUSE |
200000 |
CC ROAD UPGRADATION FROM ICHHAB ALIS HOUSE TO MIJANUR SARKARS HOUSE VIA SAHABAT ALIS HOUSE1 |
Plinth level |
-
latitude : 25.43733065,25.43732292,25.43732554
Longitude : 88.6791603,88.67923236,88.67913908
file name : Image_06022023150900223.png
|
2023-02-06 15:09:00.340654 |
118 |
47231113 |
CONSTRUCTION OF BAMBOO PILLING FROM MAJIDURS HOUSE TO MIJANURS HOUSE |
50000 |
CONSTRUCTION OF BAMBOO PILLING FROM MAJIDURS HOUSE TO MIJANURS HOUSE1 |
Completion of work |
-
latitude : 25.437282,25.43720615
Longitude : 88.67957049,88.67957204
file name : Image_28012023111745150.png
|
2023-01-28 11:17:45.210372 |
119 |
47230427 |
CONSTRUCTION OF BAMBOO PILLING BE SIDE RAMJAN MIAHS HOUSE |
50000 |
CONSTRUCTION OF BAMBOO PILLING BE SIDE RAMJAN MIAHS HOUSE1 |
Completion of work |
-
latitude : 25.43760486,25.43762147,25.4376005
Longitude : 88.68026377,88.68034436,88.68027306
file name : Image_28012023111750959.png
|
2023-01-28 11:17:51.023054 |
120 |
47226297 |
CONSTRUCTION OF BAMBOO PILLING FROM KHOKONS HOUSE TO MAIDURS HOUSE |
30000 |
CONSTRUCTION OF BAMBOO PILLING FROM KHOKONS HOUSE TO MAIDURS HOUSE1 |
Completion of work |
-
latitude : 25.42072007,25.42071981,25.42064963,25.42073782
Longitude : 88.66799375,88.66799891,88.6680025,88.6680026
file name : Image_24012023164509350.png
|
2023-01-24 16:45:09.427719 |
121 |
47226178 |
CONSTRUCTION OF BAMBOO PILLING FROM JIBANS HOUSE TO KHOKONS HOUSE |
30000 |
CONSTRUCTION OF BAMBOO PILLING FROM JIBANS HOUSE TO KHOKONS HOUSE1 |
Plinth level |
-
latitude : 25.42036597,25.4203012,25.42036228
Longitude : 88.66845889,88.66847464,88.66847064
file name : Image_24012023164514525.png
|
2023-01-24 16:45:14.63055 |
122 |
56810028 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM ZP ROAD TOWARDS SAHAZAD ALIS HOUSE AT BONPUKUR UNDER NILHA |
325000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM ZP ROAD TOWARDS SAHAZAD ALIS HOUSE AT BONPUKUR UNDER NILHA1 |
Completion of work |
-
latitude : 25.42531022,25.42533048,25.42536041
Longitude : 88.65735721,88.65736716,88.65737133
file name : Image_22032023143222966.png
|
2023-03-22 14:32:23.026092 |
123 |
56806756 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM CC ROAD TOWARDS RENTAJUL ALIS HOUSE AT BANSPARA DOMUTHA FA |
290000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM CC ROAD TOWARDS RENTAJUL ALIS HOUSE AT BANSPARA DOMUTHA FA1 |
Completion of work |
-
latitude : 25.47490315,25.47490857,25.4748976
Longitude : 88.65654394,88.65656996,88.65657305
file name : Image_22032023143241872.png
|
2023-03-22 14:32:41.933546 |
124 |
47243885 |
PURCHASES OF HUME PIPE |
400000 |
PURCHASES OF HUME PIPE1 |
Plinth level |
-
latitude : 25.44409199,25.44407712
Longitude : 88.67701235,88.67701225
file name : Image_31052022151514125.png
|
2022-05-31 15:15:14.219938 |
125 |
47243885 |
PURCHASES OF HUME PIPE |
400000 |
PURCHASES OF HUME PIPE1 |
Completion of work |
-
latitude : 25.4439683,25.4439511
Longitude : 88.6769792,88.6769774
file name : Image_18052022150557492.png
|
2022-05-18 15:05:57.579611 |
126 |
35141890 |
PURCHES OF TUBE WELL MATERIALS AND WAGE ALL SANSAD |
420000 |
PURCHES OF TUBE WELL MATERIALS AND WAGE ALL SANSAD 1 |
Plinth level |
-
latitude : 25.44422559
Longitude : 88.67688295
file name : Image_08102021152836032.png
|
2021-10-08 15:28:36.18638 |
127 |
35141890 |
PURCHES OF TUBE WELL MATERIALS AND WAGE ALL SANSAD |
420000 |
PURCHES OF TUBE WELL MATERIALS AND WAGE ALL SANSAD 1 |
Completion of work |
-
latitude : 25.44422459
Longitude : 88.67690231
file name : Image_07102021155228586.png
|
2021-10-07 15:52:28.704357 |
128 |
39078260 |
Construction of pure drinking water system infornt of Nehemba FP school |
450000 |
Construction of pure drinking water system infornt of Nehemba FP school1 |
Plinth level |
-
latitude : 25.42175817
Longitude : 88.64577333
file name : Image_25032022161942586.png
|
2022-03-25 16:19:42.687264 |
129 |
39078260 |
Construction of pure drinking water system infornt of Nehemba FP school |
450000 |
Construction of pure drinking water system infornt of Nehemba FP school1 |
Completion of work |
-
latitude : 25.42179096
Longitude : 88.64574094
file name : Image_01122021115014281.png
|
2021-12-01 11:50:14.413387 |
130 |
35160666 |
PURCHES OF HUME PIPE ALL SANSAD |
251000 |
PURCHES OF HUME PIPE ALL SANSAD1 |
Plinth level |
-
latitude : 25.41390944,25.41395361,25.41392845
Longitude : 88.6701832,88.67011766,88.67015942
file name : Image_09092021131750022.png
|
2021-09-09 13:17:50.114339 |
131 |
35160666 |
PURCHES OF HUME PIPE ALL SANSAD |
251000 |
PURCHES OF HUME PIPE ALL SANSAD1 |
Completion of work |
-
latitude : 25.41396264,25.41391895
Longitude : 88.67010553,88.67015761
file name : Image_27082021124324098.png
|
2021-08-27 12:43:24.211495 |
132 |
39084536 |
Construction of pure drinking water system infornt of Alok Roy house |
450000 |
Construction of pure drinking water system infornt of Alok Roy house1 |
Plinth level |
-
latitude : 25.47323685
Longitude : 88.65522085
file name : Image_25032022161954423.png
|
2022-03-25 16:19:54.522845 |
133 |
39084536 |
Construction of pure drinking water system infornt of Alok Roy house |
450000 |
Construction of pure drinking water system infornt of Alok Roy house1 |
Plinth level |
-
latitude : 25.47323685
Longitude : 88.65522085
file name : Image_25032022162021468.png
|
2022-03-25 16:20:21.56684 |
134 |
39084536 |
Construction of pure drinking water system infornt of Alok Roy house |
450000 |
Construction of pure drinking water system infornt of Alok Roy house1 |
Completion of work |
-
latitude : 25.4732014
Longitude : 88.6552239
file name : Image_01122021115121917.png
|
2021-12-01 11:51:22.03066 |
135 |
39084524 |
Construction of pure drinking water system infornt of Kamrul Ali house at Chandura |
450000 |
Construction of pure drinking water system infornt of Kamrul Ali house at Chandura1 |
Plinth level |
-
latitude : 25.46185061
Longitude : 88.65369725
file name : Image_25032022161948166.png
|
2022-03-25 16:19:48.275517 |
136 |
39084524 |
Construction of pure drinking water system infornt of Kamrul Ali house at Chandura |
450000 |
Construction of pure drinking water system infornt of Kamrul Ali house at Chandura1 |
Completion of work |
-
latitude : 25.46179782
Longitude : 88.65367285
file name : Image_01122021114956088.png
|
2021-12-01 11:49:56.215398 |
137 |
39084622 |
Construction of pure drinking water system near Nalpukur bazer |
450000 |
Construction of pure drinking water system near Nalpukur bazer 1 |
Completion of work |
-
latitude : 25.4588
Longitude : 88.6762079
file name : Image_01122021114941634.png
|
2021-12-01 11:49:41.761199 |
138 |
39084345 |
Construction of pure drinking water system infornt of Ashokegram GP office |
450000 |
Construction of pure drinking water system infornt of Ashokegram GP office1 |
Completion of work |
-
latitude : 25.4437755
Longitude : 88.6772404
file name : Image_01122021115103849.png
|
2021-12-01 11:51:03.965655 |
139 |
39084345 |
Construction of pure drinking water system infornt of Ashokegram GP office |
450000 |
Construction of pure drinking water system infornt of Ashokegram GP office1 |
Completion of work |
-
latitude : 25.4440475
Longitude : 88.6770359
file name : Image_01122021115115439.png
|
2021-12-01 11:51:15.547559 |
140 |
39084345 |
Construction of pure drinking water system infornt of Ashokegram GP office |
450000 |
Construction of pure drinking water system infornt of Ashokegram GP office1 |
Completion of work |
-
latitude : 25.4437755
Longitude : 88.6772404
file name : Image_01122021115232849.png
|
2021-12-01 11:52:32.975793 |
141 |
39084345 |
Construction of pure drinking water system infornt of Ashokegram GP office |
450000 |
Construction of pure drinking water system infornt of Ashokegram GP office1 |
Plinth level |
-
latitude : 25.4441157
Longitude : 88.6769799
file name : Image_14032022222308350.png
|
2022-03-14 22:23:08.449641 |
142 |
39084345 |
Construction of pure drinking water system infornt of Ashokegram GP office |
450000 |
Construction of pure drinking water system infornt of Ashokegram GP office1 |
Completion of work |
-
latitude : 25.4440475
Longitude : 88.6770359
file name : Image_01122021115255696.png
|
2021-12-01 11:52:55.816349 |
143 |
39078315 |
Construction of pure drinking water system at Nilhari FP school |
450000 |
Construction of pure drinking water system at Nilhari FP school 1 |
Completion of work |
-
latitude : 25.43422979
Longitude : 88.66073791
file name : Image_01122021115026932.png
|
2021-12-01 11:50:27.065407 |
144 |
39078315 |
Construction of pure drinking water system at Nilhari FP school |
450000 |
Construction of pure drinking water system at Nilhari FP school 1 |
Plinth level |
-
latitude : 25.43418589
Longitude : 88.6607269
file name : Image_14032022222247217.png
|
2022-03-14 22:22:47.317377 |
145 |
39078315 |
Construction of pure drinking water system at Nilhari FP school |
450000 |
Construction of pure drinking water system at Nilhari FP school 1 |
Completion of work |
-
latitude : 25.43422979
Longitude : 88.66073791
file name : Image_01122021115128125.png
|
2021-12-01 11:51:28.23988 |
146 |
39084365 |
Construction of pure drinking water system at Kamat para more |
450000 |
Construction of pure drinking water system at Kamat para more1 |
Completion of work |
-
latitude : 25.4419651
Longitude : 88.6744471
file name : Image_01122021115051682.png
|
2021-12-01 11:50:51.801566 |
147 |
39084365 |
Construction of pure drinking water system at Kamat para more |
450000 |
Construction of pure drinking water system at Kamat para more1 |
Plinth level |
-
latitude : 25.44193348
Longitude : 88.67442054
file name : Image_14032022222314646.png
|
2022-03-14 22:23:14.747455 |
148 |
39084365 |
Construction of pure drinking water system at Kamat para more |
450000 |
Construction of pure drinking water system at Kamat para more1 |
Completion of work |
-
latitude : 25.4419651
Longitude : 88.6744471
file name : Image_01122021115215700.png
|
2021-12-01 11:52:15.827127 |
149 |
39078373 |
Construction of pure drinking water system near Gokulpur bazar |
450000 |
Construction of pure drinking water system near Gokulpur bazar 1 |
Completion of work |
-
latitude : 25.41468763
Longitude : 88.6716763
file name : Image_01122021115039619.png
|
2021-12-01 11:50:39.728445 |
150 |
39078373 |
Construction of pure drinking water system near Gokulpur bazar |
450000 |
Construction of pure drinking water system near Gokulpur bazar 1 |
Plinth level |
-
latitude : 25.41475302
Longitude : 88.67176308
file name : Image_14032022222239095.png
|
2022-03-14 22:22:39.211765 |
151 |
39078373 |
Construction of pure drinking water system near Gokulpur bazar |
450000 |
Construction of pure drinking water system near Gokulpur bazar 1 |
Completion of work |
-
latitude : 25.41468763
Longitude : 88.6716763
file name : Image_01122021115145915.png
|
2021-12-01 11:51:46.032012 |
152 |
39082101 |
Construction of pure drinking water system at Ashokegram hat khola |
450000 |
Construction of pure drinking water system at Ashokegram hat khola1 |
Completion of work |
-
latitude : 25.4447684
Longitude : 88.6775783
file name : Image_01122021115058043.png
|
2021-12-01 11:50:58.171607 |
153 |
39082101 |
Construction of pure drinking water system at Ashokegram hat khola |
450000 |
Construction of pure drinking water system at Ashokegram hat khola1 |
Plinth level |
-
latitude : 25.44476837
Longitude : 88.67762042
file name : Image_14032022222259167.png
|
2022-03-14 22:22:59.27468 |
154 |
39082101 |
Construction of pure drinking water system at Ashokegram hat khola |
450000 |
Construction of pure drinking water system at Ashokegram hat khola1 |
Completion of work |
-
latitude : 25.4447684
Longitude : 88.6775783
file name : Image_01122021115224816.png
|
2021-12-01 11:52:24.932461 |
155 |
39084521 |
Construction of pure drinking water system infornt of Raishali Masjid |
450000 |
Construction of pure drinking water system infornt of Raishali Masjid1 |
Plinth level |
-
latitude : 25.43573351
Longitude : 88.67211322
file name : Image_14032022222253524.png
|
2022-03-14 22:22:53.652223 |
156 |
39084521 |
Construction of pure drinking water system infornt of Raishali Masjid |
450000 |
Construction of pure drinking water system infornt of Raishali Masjid1 |
Completion of work |
-
latitude : 25.43572305
Longitude : 88.6721103
file name : Image_01122021115020782.png
|
2021-12-01 11:50:20.900434 |
157 |
39084602 |
Construction of pure drinking water system infornt of new ICDS at Garoa |
450000 |
Construction of pure drinking water system infornt of new ICDS at Garoa 1 |
Completion of work |
-
latitude : 25.43727494
Longitude : 88.6918571
file name : Image_01122021115045500.png
|
2021-12-01 11:50:45.626778 |
158 |
39084602 |
Construction of pure drinking water system infornt of new ICDS at Garoa |
450000 |
Construction of pure drinking water system infornt of new ICDS at Garoa 1 |
Plinth level |
-
latitude : 25.4373892
Longitude : 88.69187525
file name : Image_14032022222333163.png
|
2022-03-14 22:23:33.26503 |
159 |
39084602 |
Construction of pure drinking water system infornt of new ICDS at Garoa |
450000 |
Construction of pure drinking water system infornt of new ICDS at Garoa 1 |
Completion of work |
-
latitude : 25.43727494
Longitude : 88.6918571
file name : Image_01122021115157404.png
|
2021-12-01 11:51:57.558832 |
160 |
39082017 |
Construction of pure drinking water system near Srirampur bazar |
450000 |
Construction of pure drinking water system near Srirampur bazar1 |
Completion of work |
-
latitude : 25.40814639
Longitude : 88.68375613
file name : Image_01122021115244538.png
|
2021-12-01 11:52:44.669538 |
161 |
39082017 |
Construction of pure drinking water system near Srirampur bazar |
450000 |
Construction of pure drinking water system near Srirampur bazar1 |
Completion of work |
-
latitude : 25.4076113
Longitude : 88.6832994
file name : Image_01122021115138796.png
|
2021-12-01 11:51:38.914218 |
162 |
39082017 |
Construction of pure drinking water system near Srirampur bazar |
450000 |
Construction of pure drinking water system near Srirampur bazar1 |
Completion of work |
-
latitude : 25.40814639
Longitude : 88.68375613
file name : Image_01122021115109629.png
|
2021-12-01 11:51:09.767991 |
163 |
39082017 |
Construction of pure drinking water system near Srirampur bazar |
450000 |
Construction of pure drinking water system near Srirampur bazar1 |
Completion of work |
-
latitude : 25.4076113
Longitude : 88.6832994
file name : Image_01122021115033418.png
|
2021-12-01 11:50:33.54722 |
164 |
39082017 |
Construction of pure drinking water system near Srirampur bazar |
450000 |
Construction of pure drinking water system near Srirampur bazar1 |
Completion of work |
-
latitude : 25.4086409
Longitude : 88.68355443
file name : Image_30122021152523786.png
|
2021-12-30 15:25:23.926989 |
165 |
39082017 |
Construction of pure drinking water system near Srirampur bazar |
450000 |
Construction of pure drinking water system near Srirampur bazar1 |
Completion of work |
-
latitude : 25.40865343
Longitude : 88.68362475
file name : Image_14032022222232433.png
|
2022-03-14 22:22:32.552168 |
166 |
39084814 |
Construction of pure drinking water system infornt of Mafijur Rahaman house at Chilakuri |
450000 |
Construction of pure drinking water system infornt of Mafijur Rahaman house at Chilakuri1 |
Plinth level |
-
latitude : 25.46916178
Longitude : 88.66122715
file name : Image_14032022222320678.png
|
2022-03-14 22:23:20.832269 |
167 |
39084814 |
Construction of pure drinking water system infornt of Mafijur Rahaman house at Chilakuri |
450000 |
Construction of pure drinking water system infornt of Mafijur Rahaman house at Chilakuri1 |
Completion of work |
-
latitude : 25.46912467
Longitude : 88.6611954
file name : Image_01122021115002795.png
|
2021-12-01 11:50:02.910747 |
168 |
39084590 |
Construction of pure drinking water system infornt of Mukul Barman house at Kamarkhair |
450000 |
Construction of pure drinking water system infornt of Mukul Barman house at Kamarkhair1 |
Completion of work |
-
latitude : 25.45675414
Longitude : 88.66244608
file name : Image_01122021115009297.png
|
2021-12-01 11:50:09.411724 |
169 |
39084597 |
Construction of pure drinking water system infornt of Baspara Maszid |
450000 |
Construction of pure drinking water system infornt of Baspara Maszid 1 |
Plinth level |
-
latitude : 25.47588765
Longitude : 88.65664654
file name : Image_14032022222327780.png
|
2022-03-14 22:23:27.888958 |
170 |
39084597 |
Construction of pure drinking water system infornt of Baspara Maszid |
450000 |
Construction of pure drinking water system infornt of Baspara Maszid 1 |
Completion of work |
-
latitude : 25.47584902
Longitude : 88.65671482
file name : Image_01122021114949714.png
|
2021-12-01 11:49:49.873352 |
171 |
34645058 |
BAMBOO PILLING BESIDE SAHAJAN MIAH POND |
50000 |
BAMBOO PILLING BESIDE SAHAJAN MIAH POND1 |
Completion of work |
-
latitude : 25.42411842,25.42401223,25.42410075
Longitude : 88.65629892,88.65634203,88.6562542
file name : Image_15092021155236367.png
|
2021-09-15 15:52:36.486995 |
172 |
34719611 |
CC ROAD FROM ZP ROAD TO HOUSE OF MAMTAJ MIAH |
175000 |
CC ROAD FROM ZP ROAD TO HOUSE OF MAMTAJ MIAH1 |
Plinth level |
-
latitude : 25.42837223,25.42838756,25.42837652
Longitude : 88.67504083,88.67522611,88.67505688
file name : Image_12092021150649585.png
|
2021-09-12 15:06:49.671294 |
173 |
34719611 |
CC ROAD FROM ZP ROAD TO HOUSE OF MAMTAJ MIAH |
175000 |
CC ROAD FROM ZP ROAD TO HOUSE OF MAMTAJ MIAH1 |
Completion of work |
-
latitude : 25.42837928,25.4283979,25.42838522
Longitude : 88.67505365,88.67519329,88.67505555
file name : Image_09092021160714064.png
|
2021-09-09 16:07:14.177389 |
174 |
34719611 |
CC ROAD FROM ZP ROAD TO HOUSE OF MAMTAJ MIAH |
175000 |
CC ROAD FROM ZP ROAD TO HOUSE OF MAMTAJ MIAH1 |
Completion of work |
-
latitude : 25.42837689,25.42839322,25.42837211
Longitude : 88.67505142,88.6751327,88.67506514
file name : Image_09092021142705397.png
|
2021-09-09 14:27:05.517882 |
175 |
34690177 |
CC ROAD FROM HOUSE OF SANTOSH ROY TO LAXMI MANDIR |
175000 |
CC ROAD FROM HOUSE OF SANTOSH ROY TO LAXMI MANDIR1 |
Plinth level |
-
latitude : 25.40992486,25.40975437,25.40991181
Longitude : 88.68616439,88.68618434,88.68615414
file name : Image_09092021160758099.png
|
2021-09-09 16:07:58.198063 |
176 |
34690177 |
CC ROAD FROM HOUSE OF SANTOSH ROY TO LAXMI MANDIR |
175000 |
CC ROAD FROM HOUSE OF SANTOSH ROY TO LAXMI MANDIR1 |
Completion of work |
-
latitude : 25.40986732,25.40970176,25.40988013
Longitude : 88.6861695,88.68620443,88.68614153
file name : Image_27082021124305827.png
|
2021-08-27 12:43:05.941853 |
177 |
56822446 |
REPAIRING OF ROAD WITH BAMBOO PILLING OF ASHIM DAS POND SIDE AT BHABANIPUR |
40000 |
REPAIRING OF ROAD WITH BAMBOO PILLING OF ASHIM DAS POND SIDE AT BHABANIPUR1 |
Completion of work |
-
latitude : 25.4191135,25.41913837,25.41911894
Longitude : 88.67091562,88.67085477,88.67090928
file name : Image_27032023185359961.png
|
2023-03-27 18:54:00.027976 |
178 |
46642939 |
CONSTRUCTION OF PUCCA DRAIN FROM SARAFAT MONDALS SHOP TO RAGHUBIR PAULS HOUSE |
269000 |
CONSTRUCTION OF PUCCA DRAIN FROM SARAFAT MONDALS SHOP TO RAGHUBIR PAULS HOUSE1 |
Completion of work |
-
latitude : 25.4428925,25.4428387,25.4428421
Longitude : 88.6772756,88.6772114,88.6772113
file name : Image_15022023143529053.png
|
2023-02-15 14:35:29.128597 |
179 |
56817284 |
REPAIRING OF ROAD WITH BAMBOO PILLING OF MOKSED MONDAL POND SIDE AT GOKULPARA DAKSHIN PARA |
50000 |
REPAIRING OF ROAD WITH BAMBOO PILLING OF MOKSED MONDAL POND SIDE AT GOKULPARA DAKSHIN PARA1 |
Completion of work |
-
latitude : 25.41087329,25.41076161,25.41088161
Longitude : 88.6683818,88.66833808,88.66833107
file name : Image_27032023185405701.png
|
2023-03-27 18:54:05.768788 |
180 |
47225352 |
CONSTRUCTION OF BAMBOO PILLING AT MAHISHAHAR KHUTIPUKUR |
75000 |
CONSTRUCTION OF BAMBOO PILLING AT MAHISHAHAR KHUTIPUKUR1 |
Completion of work |
-
latitude : 25.44924537,25.44916672,25.44922522
Longitude : 88.65207521,88.65213284,88.65205246
file name : Image_27032023185411344.png
|
2023-03-27 18:54:11.414843 |
181 |
56814808 |
REPAIR AND MAINTAINCE OF ROAD WITH BAMBOO PILLING FROM TRANSFORMER TOWARDS CHEMIDAI HOUSE AT ASHOKGR |
50000 |
REPAIR AND MAINTAINCE OF ROAD WITH BAMBOO PILLING FROM TRANSFORMER TOWARDS CHEMIDAI HOUSE AT ASHOKGR1 |
Completion of work |
-
latitude : 25.44299678,25.44289833,25.44298567
Longitude : 88.67429775,88.67428664,88.67427989
file name : Image_27032023185416736.png
|
2023-03-27 18:54:16.798197 |
182 |
56822983 |
CONSTRUCTION OF CC ROAD FROM GOKULPUR DAKSHIN PARA MOSZID TOWARDS DACHIMUDDIN MONDAL HOUSE AT GOKULP |
100000 |
CONSTRUCTION OF CC ROAD FROM GOKULPUR DAKSHIN PARA MOSZID TOWARDS DACHIMUDDIN MONDAL HOUSE AT GOKULP1 |
Completion of work |
-
latitude : 25.4147364,25.4147364,25.4147364
Longitude : 88.6719324,88.6719324,88.6719324
file name : Image_11052023072241261.png
|
2023-05-11 07:22:41.327607 |
183 |
56876137 |
CONSTRUCTION OF COMMUNITY TOILET AT NEHEMBA BAZER |
350000 |
CONSTRUCTION OF COMMUNITY TOILET AT NEHEMBA BAZER1 |
Completion of work |
-
latitude : 25.4215505
Longitude : 88.64548229
file name : Image_11052023072310422.png
|
2023-05-11 07:23:10.492831 |
184 |
56813634 |
CONSTRUCTION OF CC ROAD WITH BAMBOO PILLING FROM CC ROAD TOWARDS MONSUR MIYAS HOUSE AT ASHOKGRAM II |
125000 |
CONSTRUCTION OF CC ROAD WITH BAMBOO PILLING FROM CC ROAD TOWARDS MONSUR MIYAS HOUSE AT ASHOKGRAM II1 |
Plinth level |
-
latitude : 25.43730863,25.43723297,25.43730572
Longitude : 88.679192,88.67921571,88.67922073
file name : Image_19052023150450568.png
|
2023-05-19 15:04:50.624122 |
185 |
56813634 |
CONSTRUCTION OF CC ROAD WITH BAMBOO PILLING FROM CC ROAD TOWARDS MONSUR MIYAS HOUSE AT ASHOKGRAM II |
125000 |
CONSTRUCTION OF CC ROAD WITH BAMBOO PILLING FROM CC ROAD TOWARDS MONSUR MIYAS HOUSE AT ASHOKGRAM II1 |
Plinth level |
-
latitude : 25.43730863,25.43723297,25.43730572
Longitude : 88.679192,88.67921571,88.67922073
file name : Image_19052023150440620.png
|
2023-05-19 15:04:40.676054 |
186 |
56813634 |
CONSTRUCTION OF CC ROAD WITH BAMBOO PILLING FROM CC ROAD TOWARDS MONSUR MIYAS HOUSE AT ASHOKGRAM II |
125000 |
CONSTRUCTION OF CC ROAD WITH BAMBOO PILLING FROM CC ROAD TOWARDS MONSUR MIYAS HOUSE AT ASHOKGRAM II1 |
Plinth level |
-
latitude : 25.43724048,25.43725204
Longitude : 88.67924047,88.67925444
file name : Image_19052023150429807.png
|
2023-05-19 15:04:29.864466 |
187 |
57125816 |
INSTALATION OF MARK II WITH PLATFORM INFRONT OF KAMARKHAIR HABLU BARMAN |
124000 |
INSTALATION OF MARK II WITH PLATFORM INFRONT OF KAMARKHAIR HABLU BARMAN1 |
Completion of work |
-
latitude : 25.45477671
Longitude : 88.66237108
file name : Image_01032023150308776.png
|
2023-03-01 15:03:08.84866 |
188 |
56878720 |
CONSTRUCTION OF PACCA DRAIN FROM DARIYA PARA SAHARAB ALIS HOUSE TOWARDS LIYAKAT ALIS HOUSE AT ASHOKG |
175000 |
CONSTRUCTION OF PACCA DRAIN FROM DARIYA PARA SAHARAB ALIS HOUSE TOWARDS LIYAKAT ALIS HOUSE AT ASHOKG1 |
Plinth level |
-
latitude : 25.44966896,25.44966896,25.4496745,25.44967661,25.4495162
Longitude : 88.67829128,88.67829128,88.67829001,88.67829391,88.67891831
file name : Image_11052023084753185.png
|
2023-05-11 08:47:53.234021 |
189 |
56878720 |
CONSTRUCTION OF PACCA DRAIN FROM DARIYA PARA SAHARAB ALIS HOUSE TOWARDS LIYAKAT ALIS HOUSE AT ASHOKG |
175000 |
CONSTRUCTION OF PACCA DRAIN FROM DARIYA PARA SAHARAB ALIS HOUSE TOWARDS LIYAKAT ALIS HOUSE AT ASHOKG1 |
Completion of work |
-
latitude : 25.44955406,25.44955392,25.44955254
Longitude : 88.67894351,88.67907702,88.67894165
file name : Image_11052023072302611.png
|
2023-05-11 07:23:02.674963 |
190 |
56878720 |
CONSTRUCTION OF PACCA DRAIN FROM DARIYA PARA SAHARAB ALIS HOUSE TOWARDS LIYAKAT ALIS HOUSE AT ASHOKG |
175000 |
CONSTRUCTION OF PACCA DRAIN FROM DARIYA PARA SAHARAB ALIS HOUSE TOWARDS LIYAKAT ALIS HOUSE AT ASHOKG1 |
Completion of work |
-
latitude : 25.4438873,25.4438873,25.4438873
Longitude : 88.6769536,88.6769536,88.6769536
file name : Image_11052023072252119.png
|
2023-05-11 07:22:52.186403 |
191 |
56839760 |
CONSTRUCTION OF CC ROAD FROM JABED ALIS SHOP TOWARDS GOLAM MOSTAFA HOUSE AT NARAIL |
200000 |
CONSTRUCTION OF CC ROAD FROM JABED ALIS SHOP TOWARDS GOLAM MOSTAFA HOUSE AT NARAIL1 |
Plinth level |
-
latitude : 25.46154658,25.46149613,25.46153636
Longitude : 88.65373908,88.65362467,88.65373154
file name : Image_11052023073531242.png
|
2023-05-11 07:35:31.299221 |
192 |
56839760 |
CONSTRUCTION OF CC ROAD FROM JABED ALIS SHOP TOWARDS GOLAM MOSTAFA HOUSE AT NARAIL |
200000 |
CONSTRUCTION OF CC ROAD FROM JABED ALIS SHOP TOWARDS GOLAM MOSTAFA HOUSE AT NARAIL1 |
Completion of work |
-
latitude : 25.46152774,25.46145157,25.46150344
Longitude : 88.65373422,88.65360726,88.65371143
file name : Image_11052023072321273.png
|
2023-05-11 07:23:21.335302 |
193 |
56839760 |
CONSTRUCTION OF CC ROAD FROM JABED ALIS SHOP TOWARDS GOLAM MOSTAFA HOUSE AT NARAIL |
200000 |
CONSTRUCTION OF CC ROAD FROM JABED ALIS SHOP TOWARDS GOLAM MOSTAFA HOUSE AT NARAIL1 |
Completion of work |
-
latitude : 25.46146893,25.46150839,25.4615416
Longitude : 88.65354035,88.65373811,88.6537269
file name : Image_11052023072257204.png
|
2023-05-11 07:22:57.265744 |
194 |
56811885 |
CONSTRUCTION OF CC ROAD FROM CC ROAD TOWARDS ICDS CENTER AT RAMPUR |
210000 |
CONSTRUCTION OF CC ROAD FROM CC ROAD TOWARDS ICDS CENTER AT RAMPUR1 |
Completion of work |
-
latitude : 25.45098933,25.45099551,25.45101873
Longitude : 88.67966374,88.67968348,88.67969163
file name : Image_25052023180449182.png
|
2023-05-25 18:04:49.246713 |
195 |
56840463 |
CONSTRUCTION OF CC ROAD FROM SIRAJUDDIN MIYAS HOUSE TOWARDS AMINUL MIYAS HOUSE AT RAISHALI |
200000 |
CONSTRUCTION OF CC ROAD FROM SIRAJUDDIN MIYAS HOUSE TOWARDS AMINUL MIYAS HOUSE AT RAISHALI1 |
Completion of work |
-
latitude : 25.43606171,25.43603787,25.43604365,25.43604694
Longitude : 88.67041185,88.67038786,88.67041251,88.6704199
file name : Image_26052023112204105.png
|
2023-05-26 11:22:04.172665 |
196 |
56807498 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM CC ROAD TOWARDS RABIUL ISLAM HOUSE AT PURBASANKARPUR |
60000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM CC ROAD TOWARDS RABIUL ISLAM HOUSE AT PURBASANKARPUR1 |
Completion of work |
-
latitude : 25.46563814,25.46564679,25.46566366
Longitude : 88.6541436,88.65414954,88.65416214
file name : Image_26052023141054074.png
|
2023-05-26 14:10:54.143309 |
197 |
56839141 |
CONSTRUCTION OF CC ROAD FROM ANOWAR ALI HOUSE TOWARDS SSK AT ANCHALAHAR |
230000 |
CONSTRUCTION OF CC ROAD FROM ANOWAR ALI HOUSE TOWARDS SSK AT ANCHALAHAR1 |
Completion of work |
-
latitude : 25.46959013,25.46960772,25.46959884,25.46966962
Longitude : 88.67072561,88.67074766,88.6707476,88.67075542
file name : Image_24052023154548883.png
|
2023-05-24 15:45:48.944528 |
198 |
56815900 |
CONSTRUCTION OF CC ROAD FROM ASHOKGRAM ATM TOWARDS BIJOU KUMAR HOUSE AT ASHOKGRAM I |
350000 |
CONSTRUCTION OF CC ROAD FROM ASHOKGRAM ATM TOWARDS BIJOU KUMAR HOUSE AT ASHOKGRAM I1 |
Completion of work |
-
latitude : 25.4439083,25.4439083,25.4439083
Longitude : 88.6769609,88.6769609,88.6769609
file name : Image_27072023154019945.png
|
2023-07-27 15:40:20.012921 |
199 |
56815900 |
CONSTRUCTION OF CC ROAD FROM ASHOKGRAM ATM TOWARDS BIJOU KUMAR HOUSE AT ASHOKGRAM I |
350000 |
CONSTRUCTION OF CC ROAD FROM ASHOKGRAM ATM TOWARDS BIJOU KUMAR HOUSE AT ASHOKGRAM I1 |
Completion of work |
-
latitude : 25.4439083,25.4439083,25.4439083
Longitude : 88.6769609,88.6769609,88.6769609
file name : Image_27072023153405718.png
|
2023-07-27 15:34:05.781131 |
200 |
56815900 |
CONSTRUCTION OF CC ROAD FROM ASHOKGRAM ATM TOWARDS BIJOU KUMAR HOUSE AT ASHOKGRAM I |
350000 |
CONSTRUCTION OF CC ROAD FROM ASHOKGRAM ATM TOWARDS BIJOU KUMAR HOUSE AT ASHOKGRAM I1 |
Completion of work |
-
latitude : 25.4439079,25.4439079,25.4439079
Longitude : 88.6769808,88.6769808,88.6769808
file name : Image_25052023152334097.png
|
2023-05-25 15:23:34.154103 |
201 |
56814079 |
CONSTRUCTION OF CC ROAD FROM TRANSFER TOWARDS HAYDER HOUSE AT ASHOKGRAM II |
75000 |
CONSTRUCTION OF CC ROAD FROM TRANSFER TOWARDS HAYDER HOUSE AT ASHOKGRAM II1 |
Completion of work |
-
latitude : 25.44312604,25.44311937,25.44313895
Longitude : 88.67438789,88.67437673,88.67437131
file name : Image_26052023115202036.png
|
2023-05-26 11:52:02.106696 |
202 |
56816920 |
REPAIRING OF ROAD WITH BAMBOO PILLING OF HAJI MOHAMMED ALIS POND SIDE AT GOKULPUR |
75000 |
REPAIRING OF ROAD WITH BAMBOO PILLING OF HAJI MOHAMMED ALIS POND SIDE AT GOKULPUR1 |
Completion of work |
-
latitude : 25.41394052,25.41393459,25.41393468
Longitude : 88.67184811,88.67184669,88.67184184
file name : Image_25052023164610857.png
|
2023-05-25 16:46:10.922331 |
203 |
56821564 |
REPAIRING OF ROAD WITH BAMBOO PILLING OF MAINUL HAQUE POND SIDE AT GOKULPUR |
50000 |
REPAIRING OF ROAD WITH BAMBOO PILLING OF MAINUL HAQUE POND SIDE AT GOKULPUR1 |
Completion of work |
-
latitude : 25.4141874,25.4141874,25.4141874
Longitude : 88.6730983,88.6730983,88.6730983
file name : Image_25052023165543564.png
|
2023-05-25 16:55:43.628066 |
204 |
46641262 |
CONSTRUCTION OF PUCCA DRAIN FROM MARK II TO AFCHHAR ALIS HOUSE AT KASHIPUR |
169000 |
CONSTRUCTION OF PUCCA DRAIN FROM MARK II TO AFCHHAR ALIS HOUSE AT KASHIPUR1 |
Plinth level |
-
latitude : 25.44819216,25.4482401
Longitude : 88.68110054,88.68105854
file name : Image_01112022135216824.png
|
2022-11-01 13:52:16.896636 |
205 |
46641262 |
CONSTRUCTION OF PUCCA DRAIN FROM MARK II TO AFCHHAR ALIS HOUSE AT KASHIPUR |
169000 |
CONSTRUCTION OF PUCCA DRAIN FROM MARK II TO AFCHHAR ALIS HOUSE AT KASHIPUR1 |
Plinth level |
-
latitude : 25.44822443,25.4482808
Longitude : 88.68124335,88.68125484
file name : Image_10052022153521530.png
|
2022-05-10 15:35:21.659052 |
206 |
56840652 |
CONSTRUCTION OF CC ROAD WITH BAMBOO PILLING FROM DULALS HOUSE TOWARDS BELTALA AT RAISHALI |
150000 |
CONSTRUCTION OF CC ROAD WITH BAMBOO PILLING FROM DULALS HOUSE TOWARDS BELTALA AT RAISHALI1 |
Plinth level |
-
latitude : 25.4372206,25.43714492,25.43711131
Longitude : 88.67240081,88.67230841,88.67222377
file name : Image_24052023130815384.png
|
2023-05-24 13:08:15.463383 |
207 |
56809310 |
REPAIR AND MAINTAINCE OF CC ROAD FROM NEHEMBA UTTAR PARA JAMIRUDDIN HOUSE TOWARDS AYUB ALIS HOUSE AT |
350000 |
REPAIR AND MAINTAINCE OF CC ROAD FROM NEHEMBA UTTAR PARA JAMIRUDDIN HOUSE TOWARDS AYUB ALIS HOUSE AT1 |
Completion of work |
-
latitude : 25.42473041,25.42485301,25.4247224
Longitude : 88.64536184,88.64535052,88.64539756
file name : Image_22032023094321181.png
|
2023-03-22 09:43:21.236924 |
208 |
56876430 |
CONSTRUCTION OF PACCA DRAIN FROM FP SCHOOL TOWARDS SARKAR PARA AT NILHARI |
175000 |
CONSTRUCTION OF PACCA DRAIN FROM FP SCHOOL TOWARDS SARKAR PARA AT NILHARI1 |
Plinth level |
-
latitude : 25.43544293,25.43548115,25.43521534
Longitude : 88.66086303,88.66085914,88.66083521
file name : Image_11052023084801210.png
|
2023-05-11 08:48:01.26115 |
209 |
56876430 |
CONSTRUCTION OF PACCA DRAIN FROM FP SCHOOL TOWARDS SARKAR PARA AT NILHARI |
175000 |
CONSTRUCTION OF PACCA DRAIN FROM FP SCHOOL TOWARDS SARKAR PARA AT NILHARI1 |
Completion of work |
-
latitude : 25.4438853,25.4438853,25.4438853
Longitude : 88.6769511,88.6769511,88.6769511
file name : Image_11052023072246588.png
|
2023-05-11 07:22:46.65405 |
210 |
56887203 |
CONSTRUCTION OF PACCA DRAIN FOR MOMINUL HAQUE TOWARDS SALUKKUDI AT ANCHALAHAR |
150000 |
CONSTRUCTION OF PACCA DRAIN FOR MOMINUL HAQUE TOWARDS SALUKKUDI AT ANCHALAHAR1 |
Completion of work |
-
latitude : 25.46982949,25.469802,25.46982024
Longitude : 88.65969474,88.65967851,88.65966512
file name : Image_22032023143245929.png
|
2023-03-22 14:32:45.988916 |
211 |
56876964 |
CONSTRUCTION OF PACCA DRAIN FROM MAMINUL SARKAR HOUSE TOWARDS ZP ROAD NEAR MARKII AT KHAILYA PARA |
175000 |
CONSTRUCTION OF PACCA DRAIN FROM MAMINUL SARKAR HOUSE TOWARDS ZP ROAD NEAR MARKII AT KHAILYA PARA1 |
Plinth level |
-
latitude : 25.43041726,25.43051732,25.4305662
Longitude : 88.66407922,88.66406122,88.66405702
file name : Image_27072023153341088.png
|
2023-07-27 15:33:41.159286 |
212 |
56876964 |
CONSTRUCTION OF PACCA DRAIN FROM MAMINUL SARKAR HOUSE TOWARDS ZP ROAD NEAR MARKII AT KHAILYA PARA |
175000 |
CONSTRUCTION OF PACCA DRAIN FROM MAMINUL SARKAR HOUSE TOWARDS ZP ROAD NEAR MARKII AT KHAILYA PARA1 |
Completion of work |
-
latitude : 25.43041836,25.43056513,25.43041611
Longitude : 88.66404993,88.66405269,88.66409016
file name : Image_24052023125424985.png
|
2023-05-24 12:54:25.049125 |
213 |
56876964 |
CONSTRUCTION OF PACCA DRAIN FROM MAMINUL SARKAR HOUSE TOWARDS ZP ROAD NEAR MARKII AT KHAILYA PARA |
175000 |
CONSTRUCTION OF PACCA DRAIN FROM MAMINUL SARKAR HOUSE TOWARDS ZP ROAD NEAR MARKII AT KHAILYA PARA1 |
Completion of work |
-
latitude : 25.4331897,25.4331897,25.4331897
Longitude : 88.6740606,88.6740606,88.6740606
file name : Image_24052023125420333.png
|
2023-05-24 12:54:20.402144 |
214 |
56879215 |
CONSTRUCTION OF PACCA DRAIN FROMCC ROAD TOWARDS TARAK BASAK HOUSE VIA BANIA KUDI AT KARAIL |
200000 |
CONSTRUCTION OF PACCA DRAIN FROMCC ROAD TOWARDS TARAK BASAK HOUSE VIA BANIA KUDI AT KARAIL1 |
Plinth level |
-
latitude : 25.419435,25.41943173,25.41938951
Longitude : 88.66970058,88.66968646,88.66965929
file name : Image_27072023153347146.png
|
2023-07-27 15:33:47.210715 |
215 |
56879215 |
CONSTRUCTION OF PACCA DRAIN FROMCC ROAD TOWARDS TARAK BASAK HOUSE VIA BANIA KUDI AT KARAIL |
200000 |
CONSTRUCTION OF PACCA DRAIN FROMCC ROAD TOWARDS TARAK BASAK HOUSE VIA BANIA KUDI AT KARAIL1 |
Completion of work |
-
latitude : 25.41942686,25.41935358,25.41938355
Longitude : 88.66969672,88.66968086,88.66969397
file name : Image_24052023125415739.png
|
2023-05-24 12:54:15.815302 |
216 |
56841210 |
REPAIR AND MAINTAINCE OF CC ROAD WITH BAMBOO PILLING OF RAGHUNATHS POND AT PURBABISHNUPUR |
50000 |
REPAIR AND MAINTAINCE OF CC ROAD WITH BAMBOO PILLING OF RAGHUNATHS POND AT PURBABISHNUPUR1 |
Plinth level |
-
latitude : 25.45977085,25.45975051,25.45974852
Longitude : 88.67425286,88.67416062,88.67414513
file name : Image_29082023111252263.png
|
2023-08-29 11:12:52.340469 |
217 |
56841210 |
REPAIR AND MAINTAINCE OF CC ROAD WITH BAMBOO PILLING OF RAGHUNATHS POND AT PURBABISHNUPUR |
50000 |
REPAIR AND MAINTAINCE OF CC ROAD WITH BAMBOO PILLING OF RAGHUNATHS POND AT PURBABISHNUPUR1 |
Completion of work |
-
latitude : 25.45977569,25.45974854,25.45974706,25.45974568
Longitude : 88.67420511,88.67418957,88.67416637,88.67414114
file name : Image_07082023165859653.png
|
2023-08-07 16:58:59.714416 |
218 |
56842928 |
CONSTREUCTION OF CC ROAD FROM NUR ISLAM HOUSE TOWARDS CHHAPAR ALIS HOUSE AT ROYPUR |
175000 |
CONSTREUCTION OF CC ROAD FROM NUR ISLAM HOUSE TOWARDS CHHAPAR ALIS HOUSE AT ROYPUR1 |
Completion of work |
-
latitude : 25.4499845,25.44999422,25.45000499
Longitude : 88.65826932,88.65827779,88.65826564
file name : Image_27072023153418427.png
|
2023-07-27 15:34:18.488747 |
219 |
56842928 |
CONSTREUCTION OF CC ROAD FROM NUR ISLAM HOUSE TOWARDS CHHAPAR ALIS HOUSE AT ROYPUR |
175000 |
CONSTREUCTION OF CC ROAD FROM NUR ISLAM HOUSE TOWARDS CHHAPAR ALIS HOUSE AT ROYPUR1 |
Completion of work |
-
latitude : 25.4499845,25.44999422,25.45000499
Longitude : 88.65826932,88.65827779,88.65826564
file name : Image_27072023154023406.png
|
2023-07-27 15:40:23.466437 |
220 |
56815319 |
CONSTRUCTION OF CC ROAD WITH BAMBOO PILLING AT TALPUKUR UNDER ASHOKGRAM II |
75000 |
CONSTRUCTION OF CC ROAD WITH BAMBOO PILLING AT TALPUKUR UNDER ASHOKGRAM II1 |
Completion of work |
-
latitude : 25.43754746,25.43754173,25.43754981
Longitude : 88.68012987,88.68013478,88.68012882
file name : Image_04092023115648212.png
|
2023-09-04 11:56:49.400733 |
221 |
67397659 |
REPAIRING RENOVATION OF EXISTING HOMEO BUILDING AT ASHOKGRAM GP |
200000 |
REPAIRING RENOVATION OF EXISTING HOMEO BUILDING AT ASHOKGRAM GP 1 |
Completion of work |
-
latitude : 25.44425969
Longitude : 88.67676844
file name : Image_20092023131813038.png
|
2023-09-20 13:18:13.107675 |
222 |
56878977 |
CONSTRUCTION OF PACCA DRAIN FROM PURBA PARAMIJANUR RAHAMAN HOUSE TOWARDS NAYAPUKUR AT GOKULPUR |
200000 |
CONSTRUCTION OF PACCA DRAIN FROM PURBA PARAMIJANUR RAHAMAN HOUSE TOWARDS NAYAPUKUR AT GOKULPUR1 |
Completion of work |
-
latitude : 25.41032475,25.41032443,25.41031747
Longitude : 88.67240104,88.67241274,88.67242625
file name : Image_04092023115728420.png
|
2023-09-04 11:57:29.088732 |
223 |
56878977 |
CONSTRUCTION OF PACCA DRAIN FROM PURBA PARAMIJANUR RAHAMAN HOUSE TOWARDS NAYAPUKUR AT GOKULPUR |
200000 |
CONSTRUCTION OF PACCA DRAIN FROM PURBA PARAMIJANUR RAHAMAN HOUSE TOWARDS NAYAPUKUR AT GOKULPUR1 |
Completion of work |
-
latitude : 25.41032475,25.41032443,25.41031747
Longitude : 88.67240104,88.67241274,88.67242625
file name : Image_04092023115708834.png
|
2023-09-04 11:57:09.729821 |
224 |
56842752 |
CONSTRUCTION OF CC ROAD FROM ZP ROAD TOWARDS SAMADUL MIYAS HOUSE AT PURBABISHNUPUR |
300000 |
CONSTRUCTION OF CC ROAD FROM ZP ROAD TOWARDS SAMADUL MIYAS HOUSE AT PURBABISHNUPUR1 |
Completion of work |
-
latitude : 25.45855532,25.45856572,25.45856842
Longitude : 88.67785582,88.67786868,88.67789145
file name : Image_26052023101431480.png
|
2023-05-26 10:14:31.5706 |
225 |
56877305 |
CONSTRUCTION OF SOLAR PURE DRINKING WATER SYSTEN INFRONT OF SAHAJAD HOSSAIN HOUSE AT RAMPUR |
350000 |
CONSTRUCTION OF SOLAR PURE DRINKING WATER SYSTEN INFRONT OF SAHAJAD HOSSAIN HOUSE AT RAMPUR1 |
Completion of work |
-
latitude : 25.45462279
Longitude : 88.67834042
file name : Image_11052023072315607.png
|
2023-05-11 07:23:15.698742 |
226 |
56838378 |
CONSTRUCTION OF CC ROAD FROM GOPI ROYS HOUSE TOWARDS GADU ROYS HOUSE AT BHOLANATHPUR |
150000 |
CONSTRUCTION OF CC ROAD FROM GOPI ROYS HOUSE TOWARDS GADU ROYS HOUSE AT BHOLANATHPUR1 |
Completion of work |
-
latitude : 25.40873169,25.40883689,25.40884282
Longitude : 88.68648102,88.68658308,88.68660643
file name : Image_25052023161401295.png
|
2023-05-25 16:14:01.353364 |
227 |
57561473 |
CONSTRUCTION OF SOLAR PURE DRINKING WATER SYSTEM AT BHOLANATHPUR LAXMITALA |
330000 |
CONSTRUCTION OF SOLAR PURE DRINKING WATER SYSTEM AT BHOLANATHPUR LAXMITALA1 |
Completion of work |
-
latitude : 25.40934408
Longitude : 88.6861912
file name : Image_01032023150304765.png
|
2023-03-01 15:03:04.835283 |
228 |
56877587 |
CONSTRUCTION OF PACCA DRAIN FROM KUDDUS MIYA HOUSE TOWARDS KADER MIYAS HOUSE AT GAROA |
200000 |
CONSTRUCTION OF PACCA DRAIN FROM KUDDUS MIYA HOUSE TOWARDS KADER MIYAS HOUSE AT GAROA1 |
Roof laid |
-
latitude : 25.43947986,25.43943163,25.43948434
Longitude : 88.69084604,88.69079992,88.6908602
file name : Image_13012024151948560.png
|
2024-01-13 15:19:48.633203 |
229 |
56877587 |
CONSTRUCTION OF PACCA DRAIN FROM KUDDUS MIYA HOUSE TOWARDS KADER MIYAS HOUSE AT GAROA |
200000 |
CONSTRUCTION OF PACCA DRAIN FROM KUDDUS MIYA HOUSE TOWARDS KADER MIYAS HOUSE AT GAROA1 |
Plinth level |
-
latitude : 25.43941266,25.4393734,25.4393734,25.4393734,25.4393734,25.43937107,25.43938521
Longitude : 88.69083699,88.69084033,88.69084033,88.69084033,88.69084033,88.69083745,88.69085946
file name : Image_01012024163942744.png
|
2024-01-01 16:39:42.841445 |
230 |
56877587 |
CONSTRUCTION OF PACCA DRAIN FROM KUDDUS MIYA HOUSE TOWARDS KADER MIYAS HOUSE AT GAROA |
200000 |
CONSTRUCTION OF PACCA DRAIN FROM KUDDUS MIYA HOUSE TOWARDS KADER MIYAS HOUSE AT GAROA1 |
Plinth level |
-
latitude : 25.43938746,25.43938692,25.43938837
Longitude : 88.6908844,88.69087807,88.69087634
file name : Image_25122023124600056.png
|
2023-12-25 12:45:58.096303 |
231 |
56877587 |
CONSTRUCTION OF PACCA DRAIN FROM KUDDUS MIYA HOUSE TOWARDS KADER MIYAS HOUSE AT GAROA |
200000 |
CONSTRUCTION OF PACCA DRAIN FROM KUDDUS MIYA HOUSE TOWARDS KADER MIYAS HOUSE AT GAROA1 |
Plinth level |
-
latitude : 25.43938746,25.43938692,25.43938837
Longitude : 88.6908844,88.69087807,88.69087634
file name : Image_25122023124542626.png
|
2023-12-25 12:45:42.532738 |
232 |
56877587 |
CONSTRUCTION OF PACCA DRAIN FROM KUDDUS MIYA HOUSE TOWARDS KADER MIYAS HOUSE AT GAROA |
200000 |
CONSTRUCTION OF PACCA DRAIN FROM KUDDUS MIYA HOUSE TOWARDS KADER MIYAS HOUSE AT GAROA1 |
Completion of work |
-
latitude : 25.43940786,25.43940589,25.43940514
Longitude : 88.69082881,88.69078138,88.69071334
file name : Image_19122023154617444.png
|
2023-12-19 15:46:17.515652 |
233 |
57171084 |
INSTALATION OF MARK II WITH PLAT FORM INFORNT OF UTTARPARA JAHAR ALIS HOUSE AT GOKULPUR |
124000 |
INSTALATION OF MARK II WITH PLAT FORM INFORNT OF UTTARPARA JAHAR ALIS HOUSE AT GOKULPUR1 |
Roof laid |
-
latitude : 25.41559907
Longitude : 88.66995043
file name : Image_29012024153421316.png
|
2024-01-29 15:34:21.383734 |
234 |
57171084 |
INSTALATION OF MARK II WITH PLAT FORM INFORNT OF UTTARPARA JAHAR ALIS HOUSE AT GOKULPUR |
124000 |
INSTALATION OF MARK II WITH PLAT FORM INFORNT OF UTTARPARA JAHAR ALIS HOUSE AT GOKULPUR1 |
Plinth level |
-
latitude : 25.4156802
Longitude : 88.66996485
file name : Image_28012024165119010.png
|
2024-01-28 16:51:19.078832 |
235 |
57171084 |
INSTALATION OF MARK II WITH PLAT FORM INFORNT OF UTTARPARA JAHAR ALIS HOUSE AT GOKULPUR |
124000 |
INSTALATION OF MARK II WITH PLAT FORM INFORNT OF UTTARPARA JAHAR ALIS HOUSE AT GOKULPUR1 |
Completion of work |
-
latitude : 25.41566535
Longitude : 88.66998781
file name : Image_25122023124530884.png
|
2023-12-25 12:45:30.868885 |
236 |
57139616 |
INSTALATION OF MARK II WITH PLAT FORM INFORNT OF ANICHHUR RAHAMAN HOUSE AT CHAKAHAR |
124000 |
INSTALATION OF MARK II WITH PLAT FORM INFORNT OF ANICHHUR RAHAMAN HOUSE AT CHAKAHAR1 |
Plinth level |
-
latitude : 25.47579195
Longitude : 88.65222309
file name : Image_12012024110118206.png
|
2024-01-12 11:01:18.284142 |
237 |
57139616 |
INSTALATION OF MARK II WITH PLAT FORM INFORNT OF ANICHHUR RAHAMAN HOUSE AT CHAKAHAR |
124000 |
INSTALATION OF MARK II WITH PLAT FORM INFORNT OF ANICHHUR RAHAMAN HOUSE AT CHAKAHAR1 |
Completion of work |
-
latitude : 25.47576916
Longitude : 88.65221086
file name : Image_25122023130203003.png
|
2023-12-25 13:02:03.08802 |
238 |
57127913 |
INSTALATION OF MARK II WITH PLAT FORM INFRONT OF MONDAL PARA MOSZID AT NEHEMBA |
124000 |
INSTALATION OF MARK II WITH PLAT FORM INFRONT OF MONDAL PARA MOSZID AT NEHEMBA 1 |
Roof laid |
-
latitude : 25.42284809
Longitude : 88.64674812
file name : Image_28022024104751938.png
|
2024-02-28 10:47:52.017178 |
239 |
57127913 |
INSTALATION OF MARK II WITH PLAT FORM INFRONT OF MONDAL PARA MOSZID AT NEHEMBA |
124000 |
INSTALATION OF MARK II WITH PLAT FORM INFRONT OF MONDAL PARA MOSZID AT NEHEMBA 1 |
Plinth level |
-
latitude : 25.42278876
Longitude : 88.64679663
file name : Image_20022024152215758.png
|
2024-02-20 15:22:15.8628 |
240 |
57127913 |
INSTALATION OF MARK II WITH PLAT FORM INFRONT OF MONDAL PARA MOSZID AT NEHEMBA |
124000 |
INSTALATION OF MARK II WITH PLAT FORM INFRONT OF MONDAL PARA MOSZID AT NEHEMBA 1 |
Completion of work |
-
latitude : 25.42285647
Longitude : 88.64677661
file name : Image_15022024164930423.png
|
2024-02-15 16:49:30.506255 |
241 |
56889235 |
INSTALATION OF INDIAN MARK II TUBEWELL WITH PLAT FORM INFORNT OF ABDULLAH MIAH AT CHANDURA |
124000 |
INSTALATION OF INDIAN MARK II TUBEWELL WITH PLAT FORM INFORNT OF ABDULLAH MIAH AT CHANDURA1 |
Plinth level |
-
latitude : 25.4598579
Longitude : 88.65224904
file name : Image_11012024152219726.png
|
2024-01-11 15:22:19.795174 |
242 |
56889235 |
INSTALATION OF INDIAN MARK II TUBEWELL WITH PLAT FORM INFORNT OF ABDULLAH MIAH AT CHANDURA |
124000 |
INSTALATION OF INDIAN MARK II TUBEWELL WITH PLAT FORM INFORNT OF ABDULLAH MIAH AT CHANDURA1 |
Roof laid |
-
latitude : 25.45982249
Longitude : 88.65222621
file name : Image_12012024105646727.png
|
2024-01-12 10:56:46.794786 |
243 |
56889235 |
INSTALATION OF INDIAN MARK II TUBEWELL WITH PLAT FORM INFORNT OF ABDULLAH MIAH AT CHANDURA |
124000 |
INSTALATION OF INDIAN MARK II TUBEWELL WITH PLAT FORM INFORNT OF ABDULLAH MIAH AT CHANDURA1 |
Plinth level |
-
latitude : 25.45983539
Longitude : 88.65227134
file name : Image_11012024152212469.png
|
2024-01-11 15:22:12.54278 |
244 |
56889235 |
INSTALATION OF INDIAN MARK II TUBEWELL WITH PLAT FORM INFORNT OF ABDULLAH MIAH AT CHANDURA |
124000 |
INSTALATION OF INDIAN MARK II TUBEWELL WITH PLAT FORM INFORNT OF ABDULLAH MIAH AT CHANDURA1 |
Completion of work |
-
latitude : 25.4615421
Longitude : 88.6521585
file name : Image_19122023154622756.png
|
2023-12-19 15:46:22.832696 |
245 |
56878190 |
CONSTRUCTION OF PACCA DRAIN FROM ULEMANIES HOUSE TOWARDS MAJIDUR HOUSE AT ASHOKGRAM II |
100000 |
CONSTRUCTION OF PACCA DRAIN FROM ULEMANIES HOUSE TOWARDS MAJIDUR HOUSE AT ASHOKGRAM II1 |
Plinth level |
-
latitude : 25.43767154,25.43767458,25.43764164
Longitude : 88.67970348,88.67977635,88.67968672
file name : Image_01012024164002745.png
|
2024-01-01 16:40:02.817567 |
246 |
56878190 |
CONSTRUCTION OF PACCA DRAIN FROM ULEMANIES HOUSE TOWARDS MAJIDUR HOUSE AT ASHOKGRAM II |
100000 |
CONSTRUCTION OF PACCA DRAIN FROM ULEMANIES HOUSE TOWARDS MAJIDUR HOUSE AT ASHOKGRAM II1 |
Completion of work |
-
latitude : 25.43776309,25.4377487,25.43772346,25.43770477
Longitude : 88.67987882,88.67986207,88.67971557,88.67969946
file name : Image_28122023141756896.png
|
2023-12-28 14:17:56.966632 |
247 |
67188842 |
Construction of roads |
325000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.45163008,25.45162182
Longitude : 88.67942169,88.6794056
file name : Image_29122023100819835.png
|
2023-12-29 10:08:19.906918 |
248 |
67188842 |
Construction of roads |
325000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.4516322,25.45156526,25.45163254
Longitude : 88.67945989,88.67940209,88.67946031
file name : Image_28122023141743933.png
|
2023-12-28 14:17:44.006761 |
249 |
67188842 |
Construction of roads |
325000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.45164752,25.45158965,25.45167171
Longitude : 88.67944342,88.67937594,88.67945266
file name : Image_15122023145217732.png
|
2023-12-15 14:52:17.855541 |
250 |
67534096 |
Water Supply to villages |
330000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.41994336
Longitude : 88.69211482
file name : Image_25052024175712032.png
|
2024-05-25 17:57:12.134022 |
251 |
67534096 |
Water Supply to villages |
330000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.41994506
Longitude : 88.69216929
file name : Image_11032024114214589.png
|
2024-03-11 11:42:14.70208 |
252 |
67534096 |
Water Supply to villages |
330000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.41995771
Longitude : 88.69211998
file name : Image_28012024165114784.png
|
2024-01-28 16:51:14.858011 |
253 |
67251449 |
Creation of drainage channel for management of grey water |
190000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 25.41554358,25.41555309,25.41554584
Longitude : 88.64812297,88.64801205,88.64809747
file name : Image_02012024212552195.png
|
2024-01-02 21:25:52.261235 |
254 |
67251449 |
Creation of drainage channel for management of grey water |
190000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 25.41545966,25.41549067,25.415498
Longitude : 88.64807392,88.64793927,88.64809265
file name : Image_01012024163950536.png
|
2024-01-01 16:39:50.604761 |
255 |
67251449 |
Creation of drainage channel for management of grey water |
190000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 25.41554468,25.41555327,25.41555496
Longitude : 88.64809535,88.64805862,88.64804979
file name : Image_23112023145422980.png
|
2023-11-23 14:54:23.048728 |
256 |
67296873 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 25.43848937
Longitude : 88.67950543
file name : Image_15012024154955367.png
|
2024-01-15 15:49:55.438044 |
257 |
67296873 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 25.43847324
Longitude : 88.67946953
file name : Image_31122023142909622.png
|
2023-12-31 14:29:09.696161 |
258 |
67189637 |
Construction of roads |
250000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.41885683,25.4191754,25.41911162
Longitude : 88.6682317,88.66852162,88.66854454
file name : Image_02012024212600496.png
|
2024-01-02 21:26:00.562465 |
259 |
67189637 |
Construction of roads |
250000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.41882843,25.41889321
Longitude : 88.66818348,88.66816889
file name : Image_01012024163954633.png
|
2024-01-01 16:39:54.708501 |
260 |
67189637 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.41878958,25.4188679,25.41878021
Longitude : 88.66822209,88.66817541,88.66822294
file name : Image_28122023141750171.png
|
2023-12-28 14:17:50.245744 |
261 |
67533923 |
Water Supply to villages |
330000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.43308362
Longitude : 88.69356143
file name : Image_11032024114225584.png
|
2024-03-11 11:42:25.715572 |
262 |
67533923 |
Water Supply to villages |
330000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.43304592
Longitude : 88.69351015
file name : Image_25122023124555855.png
|
2023-12-25 12:45:55.841174 |
263 |
67533923 |
Water Supply to villages |
330000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.43304592
Longitude : 88.69351015
file name : Image_25122023124538748.png
|
2023-12-25 12:45:35.924703 |
264 |
67189317 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.47556387,25.47556977,25.4756328
Longitude : 88.65571757,88.65568778,88.65570095
file name : Image_29122023103435171.png
|
2023-12-29 10:34:35.243065 |
265 |
67189317 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.4755676,25.47559659,25.47561945
Longitude : 88.65574458,88.65573416,88.65570948
file name : Image_25122023125418642.png
|
2023-12-25 12:54:18.719088 |
266 |
67189317 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.47543954,25.47551329,25.47551905,25.47551905,25.47551905
Longitude : 88.65576335,88.65575293,88.65575682,88.65575682,88.65575682
file name : Image_15122023145301354.png
|
2023-12-15 14:53:01.420152 |
267 |
67189374 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.47019818,25.47011968,25.470217
Longitude : 88.66773195,88.66772787,88.66773436
file name : Image_29122023102215972.png
|
2023-12-29 10:22:16.044478 |
268 |
67189374 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.47029789,25.47021955,25.47030133
Longitude : 88.66773374,88.66774928,88.66775496
file name : Image_22122023165602813.png
|
2023-12-22 16:56:02.890209 |
269 |
67189374 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.47022642,25.47016121,25.47028636
Longitude : 88.66773739,88.66773491,88.66773543
file name : Image_19122023163059484.png
|
2023-12-19 16:30:59.557584 |
270 |
67189220 |
Construction of roads |
140000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.4221258,25.4221258,25.4221258
Longitude : 88.6399735,88.6399735,88.6399735
file name : Image_02012024212556350.png
|
2024-01-02 21:25:56.417043 |
271 |
67189220 |
Construction of roads |
140000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.42614945,25.42616407,25.4261613
Longitude : 88.64589881,88.64598826,88.6458936
file name : Image_01012024163946751.png
|
2024-01-01 16:39:46.821118 |
272 |
67189220 |
Construction of roads |
140000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.42620619,25.42620578,25.42621054
Longitude : 88.64580003,88.64594169,88.64596265
file name : Image_19122023154613293.png
|
2023-12-19 15:46:13.370865 |
273 |
67189118 |
Construction of roads |
250000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.46143834,25.46142968,25.46142649
Longitude : 88.65344359,88.65345121,88.65344976
file name : Image_28022024083008504.png
|
2024-02-28 08:30:08.629362 |
274 |
67189118 |
Construction of roads |
250000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.46152638,25.46152446,25.46152234
Longitude : 88.6533844,88.65338424,88.6533931
file name : Image_07022024114959193.png
|
2024-02-07 11:49:59.402189 |
275 |
67189118 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.4615167,25.46151401,25.46150114
Longitude : 88.65340891,88.65341249,88.65343844
file name : Image_03022024120523855.png
|
2024-02-03 12:05:23.93004 |
276 |
67533606 |
Operation and Maintenance of drinking water supply system |
200000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 25.44423353
Longitude : 88.67685949
file name : Image_28022024100000435.png
|
2024-02-28 10:00:00.539752 |
277 |
67533606 |
Operation and Maintenance of drinking water supply system |
200000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 25.44425637
Longitude : 88.6768877
file name : Image_19022024162750529.png
|
2024-02-19 16:27:50.678165 |
278 |
67533606 |
Operation and Maintenance of drinking water supply system |
200000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 25.44428278
Longitude : 88.6768872
file name : Image_16022024134843028.png
|
2024-02-16 13:48:43.125646 |
279 |
67528446 |
Creation of Shed for segregation and processing of wet and dry waste |
240656 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 25.41890825
Longitude : 88.67344196
file name : Image_29012024153925168.png
|
2024-01-29 15:39:25.241987 |
280 |
67528446 |
Creation of Shed for segregation and processing of wet and dry waste |
240656 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 25.41896341
Longitude : 88.67346024
file name : Image_13012024151952646.png
|
2024-01-13 15:19:52.71951 |
281 |
67528446 |
Creation of Shed for segregation and processing of wet and dry waste |
240656 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 25.41899491
Longitude : 88.67346135
file name : Image_02012024212603977.png
|
2024-01-02 21:26:04.036773 |
282 |
67528446 |
Creation of Shed for segregation and processing of wet and dry waste |
240656 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 25.41897068
Longitude : 88.67348887
file name : Image_01012024163958898.png
|
2024-01-01 16:39:58.973128 |
283 |
67528446 |
Creation of Shed for segregation and processing of wet and dry waste |
240656 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 25.41898049
Longitude : 88.67350521
file name : Image_23122023151534962.png
|
2023-12-23 15:15:34.84386 |
284 |
67251383 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 25.45266559,25.45263542,25.45262629
Longitude : 88.65269692,88.65269843,88.65269844
file name : Image_07022024115010632.png
|
2024-02-07 11:50:10.720276 |
285 |
67251383 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 25.45266559,25.45263542,25.45262629
Longitude : 88.65269692,88.65269843,88.65269844
file name : Image_07022024115004946.png
|
2024-02-07 11:50:05.043235 |
286 |
67251383 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 25.45266605,25.45263865,25.45263668
Longitude : 88.65267526,88.65270129,88.65268393
file name : Image_02022024162946581.png
|
2024-02-02 16:29:46.6725 |
287 |
67251383 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 25.45259373,25.45258328,25.45259292
Longitude : 88.65268015,88.65269122,88.65269069
file name : Image_25012024115936907.png
|
2024-01-25 11:59:36.988221 |
288 |
67189687 |
Construction of roads |
300000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.47154748,25.4715926,25.47164779
Longitude : 88.64921874,88.64921234,88.64921035
file name : Image_12012024102003590.png
|
2024-01-12 10:20:03.664138 |
289 |
67189687 |
Construction of roads |
300000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.47165022,25.4717083,25.47172004
Longitude : 88.64923928,88.64923413,88.64922906
file name : Image_31122023152755126.png
|
2023-12-31 15:27:55.18734 |
290 |
67189687 |
Construction of roads |
300000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.4715949,25.47153699,25.47153981
Longitude : 88.64921125,88.64924599,88.64924923
file name : Image_25122023124551655.png
|
2023-12-25 12:45:51.636683 |
291 |
67189687 |
Construction of roads |
300000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.4715949,25.47153699,25.47153981
Longitude : 88.64921125,88.64924599,88.64924923
file name : Image_25122023124605318.png
|
2023-12-25 12:46:04.920281 |
292 |
56977469 |
CONSTRUCTION OF COVERED PACCA DRAIN FROM MALEK MIYAS POND TOWARDS MAMIDUL LAND AT PURBABISHNUPUR |
140000 |
CONSTRUCTION OF COVERED PACCA DRAIN FROM MALEK MIYAS POND TOWARDS MAMIDUL LAND AT PURBABISHNUPUR1 |
Roof laid |
-
latitude : 25.45692328,25.45692406,25.45694127
Longitude : 88.67654732,88.67654047,88.67653809
file name : Image_28022024084028681.png
|
2024-02-28 08:40:28.227804 |
293 |
56977469 |
CONSTRUCTION OF COVERED PACCA DRAIN FROM MALEK MIYAS POND TOWARDS MAMIDUL LAND AT PURBABISHNUPUR |
140000 |
CONSTRUCTION OF COVERED PACCA DRAIN FROM MALEK MIYAS POND TOWARDS MAMIDUL LAND AT PURBABISHNUPUR1 |
Plinth level |
-
latitude : 25.45701041,25.45702214,25.45700668
Longitude : 88.67652215,88.67651905,88.67650938
file name : Image_27022024154104673.png
|
2024-02-27 15:41:04.791557 |
294 |
56977469 |
CONSTRUCTION OF COVERED PACCA DRAIN FROM MALEK MIYAS POND TOWARDS MAMIDUL LAND AT PURBABISHNUPUR |
140000 |
CONSTRUCTION OF COVERED PACCA DRAIN FROM MALEK MIYAS POND TOWARDS MAMIDUL LAND AT PURBABISHNUPUR1 |
Completion of work |
-
latitude : 25.45708797,25.45708797
Longitude : 88.67654082,88.67654082
file name : Image_19022024092444506.png
|
2024-02-19 09:24:44.600777 |
295 |
56890443 |
CONSTRUCTION OF PACCA DRAIN FORM KAIHARA PUKUR TOWARDS JAGANNATH ROYS HOUSE AT CHAKAHAR |
100000 |
CONSTRUCTION OF PACCA DRAIN FORM KAIHARA PUKUR TOWARDS JAGANNATH ROYS HOUSE AT CHAKAHAR1 |
Roof laid |
-
latitude : 25.47319583,25.47319804,25.47320017
Longitude : 88.65315475,88.65313811,88.65312266
file name : Image_07022024113112624.png
|
2024-02-07 11:31:12.710746 |
296 |
56890443 |
CONSTRUCTION OF PACCA DRAIN FORM KAIHARA PUKUR TOWARDS JAGANNATH ROYS HOUSE AT CHAKAHAR |
100000 |
CONSTRUCTION OF PACCA DRAIN FORM KAIHARA PUKUR TOWARDS JAGANNATH ROYS HOUSE AT CHAKAHAR1 |
Plinth level |
-
latitude : 25.47320979,25.47320359,25.47318386
Longitude : 88.65318459,88.65319718,88.65318188
file name : Image_03022024151331043.png
|
2024-02-03 15:13:31.113908 |
297 |
56890443 |
CONSTRUCTION OF PACCA DRAIN FORM KAIHARA PUKUR TOWARDS JAGANNATH ROYS HOUSE AT CHAKAHAR |
100000 |
CONSTRUCTION OF PACCA DRAIN FORM KAIHARA PUKUR TOWARDS JAGANNATH ROYS HOUSE AT CHAKAHAR1 |
Completion of work |
-
latitude : 25.47322889,25.47321133,25.47319832
Longitude : 88.65313853,88.65313529,88.65314536
file name : Image_03022024120250255.png
|
2024-02-03 12:02:50.327193 |
298 |
56890443 |
CONSTRUCTION OF PACCA DRAIN FORM KAIHARA PUKUR TOWARDS JAGANNATH ROYS HOUSE AT CHAKAHAR |
100000 |
CONSTRUCTION OF PACCA DRAIN FORM KAIHARA PUKUR TOWARDS JAGANNATH ROYS HOUSE AT CHAKAHAR1 |
Completion of work |
-
latitude : 25.44885255,25.44884999,25.44882343
Longitude : 88.65514734,88.6551496,88.65514745
file name : Image_25012024120625916.png
|
2024-01-25 12:06:25.996279 |
299 |
56876646 |
CONSTRUCTION OF PACCA DRAIN FROM ZP ROAD TOWARDS BONPUKUR CC ROAD AT BONPUKUR |
175000 |
CONSTRUCTION OF PACCA DRAIN FROM ZP ROAD TOWARDS BONPUKUR CC ROAD AT BONPUKUR1 |
Plinth level |
-
latitude : 25.42543799,25.42541633,25.42539758
Longitude : 88.65707268,88.65706285,88.6570572
file name : Image_31122023145027580.png
|
2023-12-31 14:50:27.641717 |
300 |
56876646 |
CONSTRUCTION OF PACCA DRAIN FROM ZP ROAD TOWARDS BONPUKUR CC ROAD AT BONPUKUR |
175000 |
CONSTRUCTION OF PACCA DRAIN FROM ZP ROAD TOWARDS BONPUKUR CC ROAD AT BONPUKUR1 |
Completion of work |
-
latitude : 25.42550476,25.42543076,25.42546918
Longitude : 88.65699475,88.65699382,88.65700825
file name : Image_15122023145245606.png
|
2023-12-15 14:52:45.679134 |
301 |
56840858 |
CONSTRUCTION OF CC ROAD FROM MOKSED MIYAS HOUSE TOWARDS JAME MASZID AT UTTAR PARA CHAKASHAN |
200000 |
CONSTRUCTION OF CC ROAD FROM MOKSED MIYAS HOUSE TOWARDS JAME MASZID AT UTTAR PARA CHAKASHAN1 |
Roof laid |
-
latitude : 25.47620717,25.47619769,25.47618971
Longitude : 88.65111796,88.65111956,88.65111911
file name : Image_06062024124332982.png
|
2024-06-06 12:43:33.073205 |
302 |
56840858 |
CONSTRUCTION OF CC ROAD FROM MOKSED MIYAS HOUSE TOWARDS JAME MASZID AT UTTAR PARA CHAKASHAN |
200000 |
CONSTRUCTION OF CC ROAD FROM MOKSED MIYAS HOUSE TOWARDS JAME MASZID AT UTTAR PARA CHAKASHAN1 |
Plinth level |
-
latitude : 25.47620743,25.47620282,25.47619675
Longitude : 88.65107463,88.65108392,88.65107631
file name : Image_06062024123337026.png
|
2024-06-06 12:33:37.107191 |
303 |
56840858 |
CONSTRUCTION OF CC ROAD FROM MOKSED MIYAS HOUSE TOWARDS JAME MASZID AT UTTAR PARA CHAKASHAN |
200000 |
CONSTRUCTION OF CC ROAD FROM MOKSED MIYAS HOUSE TOWARDS JAME MASZID AT UTTAR PARA CHAKASHAN1 |
Completion of work |
-
latitude : 25.47621734,25.4762013,25.47620524
Longitude : 88.6511194,88.65111708,88.65107775
file name : Image_16032024145841460.png
|
2024-03-16 14:58:41.559566 |
304 |
56812550 |
CONSTRUCTION OF CC ROAD FROM CC ROAD TOWARDS MAMINUL MIYAS HOUSE AT ASHOKGRAM II |
125000 |
CONSTRUCTION OF CC ROAD FROM CC ROAD TOWARDS MAMINUL MIYAS HOUSE AT ASHOKGRAM II1 |
Plinth level |
-
latitude : 25.43766979,25.43768706,25.43768515
Longitude : 88.68101248,88.68112234,88.68105667
file name : Image_11072024152737722.png
|
2024-07-11 15:27:37.808584 |
305 |
56812550 |
CONSTRUCTION OF CC ROAD FROM CC ROAD TOWARDS MAMINUL MIYAS HOUSE AT ASHOKGRAM II |
125000 |
CONSTRUCTION OF CC ROAD FROM CC ROAD TOWARDS MAMINUL MIYAS HOUSE AT ASHOKGRAM II1 |
Completion of work |
-
latitude : 25.43776028,25.437768,25.43771669
Longitude : 88.68134957,88.68138335,88.68128533
file name : Image_16032024110936598.png
|
2024-03-16 11:09:36.685739 |
306 |
56812550 |
CONSTRUCTION OF CC ROAD FROM CC ROAD TOWARDS MAMINUL MIYAS HOUSE AT ASHOKGRAM II |
125000 |
CONSTRUCTION OF CC ROAD FROM CC ROAD TOWARDS MAMINUL MIYAS HOUSE AT ASHOKGRAM II1 |
Completion of work |
-
latitude : 25.43776028,25.437768,25.43771669
Longitude : 88.68134957,88.68138335,88.68128533
file name : Image_16032024110913328.png
|
2024-03-16 11:09:13.4128 |
307 |
67189343 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.46456361,25.4645817,25.4645984
Longitude : 88.65109522,88.65107917,88.65105282
file name : Image_08062024162320614.png
|
2024-06-08 16:23:20.709197 |
308 |
67189343 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.4643791,25.4643791,25.4643791
Longitude : 88.6514397,88.6514397,88.6514397
file name : Image_15032024175142690.png
|
2024-03-15 17:51:42.784686 |
309 |
67189451 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.44865553,25.44863612,25.44867307
Longitude : 88.65654783,88.65652005,88.65657012
file name : Image_25062024144409771.png
|
2024-06-25 14:44:09.860514 |
310 |
67189451 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.44870739,25.44866927,25.44870186
Longitude : 88.65657688,88.65652425,88.65657306
file name : Image_15032024170507292.png
|
2024-03-15 17:05:07.396895 |
311 |
67189516 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.41013981,25.41017475,25.41012711
Longitude : 88.68650041,88.68660001,88.68647803
file name : Image_07062024160807496.png
|
2024-06-07 16:08:07.59023 |
312 |
67189516 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.41012477,25.41011655,25.41011913
Longitude : 88.68649018,88.6865073,88.68651788
file name : Image_03062024135536339.png
|
2024-06-03 13:55:36.422222 |
313 |
67189516 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.41012477,25.41011655,25.41011913
Longitude : 88.68649018,88.6865073,88.68651788
file name : Image_03062024135330276.png
|
2024-06-03 13:53:30.40786 |
314 |
67189516 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.41018984,25.41020683,25.41016884
Longitude : 88.68652545,88.68662256,88.68655577
file name : Image_15032024161610934.png
|
2024-03-15 16:16:11.190396 |
315 |
67189576 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.44158104,25.44156548,25.44158485
Longitude : 88.67971246,88.67976215,88.67976629
file name : Image_10072024121901584.png
|
2024-07-10 12:19:01.683936 |
316 |
67189576 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.44159589,25.44161197,25.44163446
Longitude : 88.67972702,88.67973205,88.67973396
file name : Image_16032024123324582.png
|
2024-03-16 12:33:24.66875 |
317 |
67238034 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 25.4303417,25.43038003
Longitude : 88.6766206,88.67669944
file name : Image_07062024160802738.png
|
2024-06-07 16:08:02.846339 |
318 |
67238034 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 25.43034066,25.43032996,25.43035023
Longitude : 88.67666364,88.67662466,88.67663539
file name : Image_16032024110907170.png
|
2024-03-16 11:09:07.262226 |
319 |
67238034 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 25.43034066,25.43032996,25.43035023
Longitude : 88.67666364,88.67662466,88.67663539
file name : Image_16032024110930903.png
|
2024-03-16 11:09:30.991329 |
320 |
67242175 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 25.43495149,25.43494066
Longitude : 88.66060642,88.66058605
file name : Image_18062024071859437.png
|
2024-06-18 07:18:59.529299 |
321 |
67242175 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 25.4349841,25.43499078,25.43497498
Longitude : 88.660592,88.66058452,88.66058012
file name : Image_16032024124821216.png
|
2024-03-16 12:48:21.32131 |
322 |
67252504 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 25.4550488
Longitude : 88.6104522
file name : Image_29072024104313885.png
|
2024-07-29 10:43:13.974207 |
323 |
67252504 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 25.4652006
Longitude : 88.63705634
file name : Image_08062024162336941.png
|
2024-06-08 16:23:37.041765 |
324 |
67252504 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 25.46526118
Longitude : 88.63701369
file name : Image_15032024175146359.png
|
2024-03-15 17:51:46.444224 |
325 |
67532444 |
Providing piped water supply to public institutions |
160000 |
Providing piped water supply to public institutions1 |
Plinth level |
-
latitude : 25.44415012
Longitude : 88.67696979
file name : Image_05062024140335960.png
|
2024-06-05 14:03:36.059302 |
326 |
67532444 |
Providing piped water supply to public institutions |
160000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 25.44420764
Longitude : 88.67692125
file name : Image_15032024170450535.png
|
2024-03-15 17:04:50.631803 |
327 |
67534027 |
Water Supply to villages |
330000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.47222377
Longitude : 88.65803543
file name : Image_08062024205443400.png
|
2024-06-08 20:54:43.485294 |
328 |
67534027 |
Water Supply to villages |
330000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.47228997
Longitude : 88.65805076
file name : Image_15032024175150099.png
|
2024-03-15 17:51:50.19624 |
329 |
70187328 |
Construction of Community Sanitary Complex |
310000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 25.4640296
Longitude : 88.6541354
file name : Image_29072024105506231.png
|
2024-07-29 10:55:06.31717 |
330 |
70187328 |
Construction of Community Sanitary Complex |
310000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 25.4640128
Longitude : 88.6540823
file name : Image_24072024114125041.png
|
2024-07-24 11:41:25.130701 |
331 |
70187328 |
Construction of Community Sanitary Complex |
310000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 25.4640128
Longitude : 88.6540823
file name : Image_24072024114116893.png
|
2024-07-24 11:41:16.988239 |
332 |
70177213 |
Construction of Community Sanitary Complex |
310000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 25.47153064
Longitude : 88.65308799
file name : Image_23062024175213281.png
|
2024-06-23 17:52:13.370988 |
333 |
70177213 |
Construction of Community Sanitary Complex |
310000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 25.47159539
Longitude : 88.65311818
file name : Image_16032024110917379.png
|
2024-03-16 11:09:17.460252 |
334 |
67536112 |
Providing piped water supply to public institutions |
180000 |
Providing piped water supply to public institutions1 |
Plinth level |
-
latitude : 25.4707591
Longitude : 88.65245764
file name : Image_08062024205436450.png
|
2024-06-08 20:54:36.554767 |
335 |
67536112 |
Providing piped water supply to public institutions |
180000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 25.47059947
Longitude : 88.65237438
file name : Image_16032024110848553.png
|
2024-03-16 11:08:48.63873 |
336 |
67251733 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 25.45346165
Longitude : 88.66328196
file name : Image_23062024175202894.png
|
2024-06-23 17:52:02.974471 |
337 |
67251733 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 25.45350889
Longitude : 88.6632534
file name : Image_12022024132047853.png
|
2024-02-12 13:20:47.927957 |
338 |
67252466 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 25.47092645
Longitude : 88.6525512
file name : Image_23062024175222136.png
|
2024-06-23 17:52:22.225478 |
339 |
67252466 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 25.47088104
Longitude : 88.65256109
file name : Image_05062024140341125.png
|
2024-06-05 14:03:41.218212 |
340 |
67251514 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 25.4670788,25.46722324,25.46716076
Longitude : 88.67078207,88.67078321,88.6707787
file name : Image_29122023101510795.png
|
2023-12-29 10:15:10.868524 |
341 |
67251514 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 25.46716805,25.46728547,25.46719412
Longitude : 88.67083196,88.67081762,88.67082216
file name : Image_22122023164643627.png
|
2023-12-22 16:46:43.693747 |
342 |
67251514 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 25.46719066,25.46725652,25.46713623
Longitude : 88.67078653,88.67078667,88.67079808
file name : Image_19122023162208243.png
|
2023-12-19 16:22:08.322135 |
343 |
67251990 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 25.43575196,25.43575626,25.43576662
Longitude : 88.67535125,88.6752946,88.67533229
file name : Image_29122023095935197.png
|
2023-12-29 09:59:35.272479 |
344 |
67251990 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 25.43577585,25.43579254,25.43577924
Longitude : 88.67535982,88.67537897,88.67532216
file name : Image_25122023124534798.png
|
2023-12-25 12:45:34.88155 |
345 |
67251990 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 25.43578807,25.43573306,25.43572041
Longitude : 88.67507277,88.67486515,88.67485912
file name : Image_01122023132505385.png
|
2023-12-01 13:25:05.462787 |
346 |
67251796 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 25.44858215,25.44850324,25.448548
Longitude : 88.65794612,88.65795075,88.65793891
file name : Image_15012024154932901.png
|
2024-01-15 15:49:32.970591 |
347 |
67251796 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 25.44859954,25.44856365,25.44856986
Longitude : 88.65793489,88.65795104,88.65794405
file name : Image_29122023165225535.png
|
2023-12-29 16:52:25.599702 |