1 |
34858017 |
Installation of Sub Marsible in front Adibashipara Club Jajiar |
150000 |
Installation of Sub Marsible in front Adibashipara Club Jajiar 1 |
Completion of work |
-
latitude : 25.30712373
Longitude : 88.64706644
file name : Image_08022021113848630.png
|
2021-02-08 11:38:48.742262 |
2 |
34856760 |
CC Darin from Dakshin pukur towards the pond of Ajijar Jajiar |
130000 |
CC Darin from Dakshin pukur towards the pond of Ajijar Jajiar 1 |
Roof laid |
-
latitude : 25.30349341,25.30349341
Longitude : 88.63674149,88.63674149
file name : Image_27032021074633179.png
|
2021-03-27 07:46:33.291208 |
3 |
34856760 |
CC Darin from Dakshin pukur towards the pond of Ajijar Jajiar |
130000 |
CC Darin from Dakshin pukur towards the pond of Ajijar Jajiar 1 |
Plinth level |
-
latitude : 25.30342092,25.30342023
Longitude : 88.636679,88.63670112
file name : Image_10032021100747557.png
|
2021-03-10 10:07:47.66212 |
4 |
34856760 |
CC Darin from Dakshin pukur towards the pond of Ajijar Jajiar |
130000 |
CC Darin from Dakshin pukur towards the pond of Ajijar Jajiar 1 |
Completion of work |
-
latitude : 25.30333682,25.30334107
Longitude : 88.63680335,88.63680288
file name : Image_15022021162238293.png
|
2021-02-15 16:22:38.383155 |
5 |
34803158 |
Installation of Sub-Marsible in front of the house of Ashraful at Majhikhanda Sansad |
150000 |
Installation of Sub-Marsible in front of the house of Ashraful at Majhikhanda Sansad1 |
Plinth level |
-
latitude : 25.30742969
Longitude : 88.60948854
file name : Image_28012022123709365.png
|
2022-01-28 12:37:09.484118 |
6 |
34803158 |
Installation of Sub-Marsible in front of the house of Ashraful at Majhikhanda Sansad |
150000 |
Installation of Sub-Marsible in front of the house of Ashraful at Majhikhanda Sansad1 |
Completion of work |
-
latitude : 25.3074536
Longitude : 88.60949588
file name : Image_05072021150009663.png
|
2021-07-05 15:00:09.830017 |
7 |
34862676 |
Installation of Sub Marsible in front of Shibtala More at Inayatpu |
150000 |
Installation of Sub Marsible in front of Shibtala More at Inayatpu 1 |
Roof laid |
-
latitude : 25.26250468
Longitude : 88.58666837
file name : Image_01092021092443982.png
|
2021-09-01 09:24:44.100019 |
8 |
34862676 |
Installation of Sub Marsible in front of Shibtala More at Inayatpu |
150000 |
Installation of Sub Marsible in front of Shibtala More at Inayatpu 1 |
Plinth level |
-
latitude : 25.26246777
Longitude : 88.59323322
file name : Image_28062021102928707.png
|
2021-06-28 10:29:28.806215 |
9 |
34862676 |
Installation of Sub Marsible in front of Shibtala More at Inayatpu |
150000 |
Installation of Sub Marsible in front of Shibtala More at Inayatpu 1 |
Completion of work |
-
latitude : 25.26248202
Longitude : 88.58681885
file name : Image_07042021083303106.png
|
2021-04-07 08:33:03.224706 |
10 |
34900884 |
Installation of Sub Marsible in front of Islam Sarkar atGodahar Para Dwipkhanda |
150000 |
Installation of Sub Marsible in front of Islam Sarkar atGodahar Para Dwipkhanda 1 |
Roof laid |
-
latitude : 25.29314745
Longitude : 88.59396046
file name : Image_07042021083315279.png
|
2021-04-07 08:33:15.402205 |
11 |
34900884 |
Installation of Sub Marsible in front of Islam Sarkar atGodahar Para Dwipkhanda |
150000 |
Installation of Sub Marsible in front of Islam Sarkar atGodahar Para Dwipkhanda 1 |
Plinth level |
-
latitude : 25.29312859
Longitude : 88.59397436
file name : Image_02032021094205076.png
|
2021-03-02 09:42:05.18418 |
12 |
34900884 |
Installation of Sub Marsible in front of Islam Sarkar atGodahar Para Dwipkhanda |
150000 |
Installation of Sub Marsible in front of Islam Sarkar atGodahar Para Dwipkhanda 1 |
Completion of work |
-
latitude : 25.2930798
Longitude : 88.59396095
file name : Image_08022021113845766.png
|
2021-02-08 11:38:45.876705 |
13 |
34862328 |
Installation of Sub-Marsible in front of house Nazrul at Sundarpur |
150000 |
Installation of Sub-Marsible in front of house Nazrul at Sundarpur 1 |
Roof laid |
-
latitude : 25.26246777
Longitude : 88.59323322
file name : Image_28062021102924982.png
|
2021-06-28 10:29:25.08345 |
14 |
34862328 |
Installation of Sub-Marsible in front of house Nazrul at Sundarpur |
150000 |
Installation of Sub-Marsible in front of house Nazrul at Sundarpur 1 |
Plinth level |
-
latitude : 25.26237488
Longitude : 88.59312266
file name : Image_07042021083307242.png
|
2021-04-07 08:33:07.368808 |
15 |
34862328 |
Installation of Sub-Marsible in front of house Nazrul at Sundarpur |
150000 |
Installation of Sub-Marsible in front of house Nazrul at Sundarpur 1 |
Completion of work |
-
latitude : 25.26235562
Longitude : 88.59313322
file name : Image_11022021141223193.png
|
2021-02-11 14:12:23.273419 |
16 |
34858904 |
Construction of CC Drain from GP Office to Karaitala at Jaminischinta |
168839 |
Construction of CC Drain from GP Office to Karaitala at Jaminischinta 1 |
Plinth level |
-
latitude : 25.29695728,25.29695727
Longitude : 88.63179677,88.63179673
file name : Image_08022021113851576.png
|
2021-02-08 11:38:51.691893 |
17 |
34858904 |
Construction of CC Drain from GP Office to Karaitala at Jaminischinta |
168839 |
Construction of CC Drain from GP Office to Karaitala at Jaminischinta 1 |
Completion of work |
-
latitude : 25.29697237,25.29697235
Longitude : 88.6318028,88.63180278
file name : Image_03022021113824362.png
|
2021-02-03 11:38:24.468484 |
18 |
34864933 |
Construction of CC road from the house Maino Soren to the house Jayanta Soren at Sarifabad |
200000 |
Construction of CC road from the house Maino Soren to the house Jayanta Soren at Sarifabad 1 |
Roof laid |
-
latitude : 25.27790512,25.27790488
Longitude : 88.59664387,88.59664395
file name : Image_07042021083311240.png
|
2021-04-07 08:33:11.368827 |
19 |
34864933 |
Construction of CC road from the house Maino Soren to the house Jayanta Soren at Sarifabad |
200000 |
Construction of CC road from the house Maino Soren to the house Jayanta Soren at Sarifabad 1 |
Roof laid |
-
latitude : 25.27782608,25.27783698
Longitude : 88.59652348,88.59652044
file name : Image_15122020144000389.png
|
2020-12-15 14:40:00.482642 |
20 |
34864933 |
Construction of CC road from the house Maino Soren to the house Jayanta Soren at Sarifabad |
200000 |
Construction of CC road from the house Maino Soren to the house Jayanta Soren at Sarifabad 1 |
Plinth level |
-
latitude : 25.27790293,25.2779027
Longitude : 88.59652137,88.59652133
file name : Image_08122020134630208.png
|
2020-12-08 13:46:30.400175 |
21 |
34864933 |
Construction of CC road from the house Maino Soren to the house Jayanta Soren at Sarifabad |
200000 |
Construction of CC road from the house Maino Soren to the house Jayanta Soren at Sarifabad 1 |
Plinth level |
-
latitude : 25.27791118,25.27791083
Longitude : 88.59652673,88.59652406
file name : Image_08122020122444691.png
|
2020-12-08 12:24:44.776704 |
22 |
34864933 |
Construction of CC road from the house Maino Soren to the house Jayanta Soren at Sarifabad |
200000 |
Construction of CC road from the house Maino Soren to the house Jayanta Soren at Sarifabad 1 |
Completion of work |
-
latitude : 25.27788872,25.27789205
Longitude : 88.596562,88.59655699
file name : Image_13112020124029394.png
|
2020-11-13 12:40:34.231294 |
23 |
34890118 |
Construction of CC Drain from Kartik Shil ChakProvuram ICDS to the Idga both side at Bhaginagar |
200000 |
Construction of CC Drain from Kartik Shil ChakProvuram ICDS to the Idga both side at Bhaginagar 1 |
Roof laid |
-
latitude : 25.27643257,25.2764247
Longitude : 88.62051522,88.62051431
file name : Image_07042021083254803.png
|
2021-04-07 08:32:54.920193 |
24 |
34890118 |
Construction of CC Drain from Kartik Shil ChakProvuram ICDS to the Idga both side at Bhaginagar |
200000 |
Construction of CC Drain from Kartik Shil ChakProvuram ICDS to the Idga both side at Bhaginagar 1 |
Plinth level |
-
latitude : 25.27647398,25.27647071
Longitude : 88.62058574,88.62059066
file name : Image_10032021100740766.png
|
2021-03-10 10:07:40.85533 |
25 |
34890118 |
Construction of CC Drain from Kartik Shil ChakProvuram ICDS to the Idga both side at Bhaginagar |
200000 |
Construction of CC Drain from Kartik Shil ChakProvuram ICDS to the Idga both side at Bhaginagar 1 |
Completion of work |
-
latitude : 25.27647207,25.27647207
Longitude : 88.62055766,88.62055765
file name : Image_18022021121317500.png
|
2021-02-18 12:13:17.591758 |
26 |
34854869 |
Construction of CC road from the land of Laxmi Kachhuya, TO the Soma Kujur at Jajiar |
150000 |
Construction of CC road from the land of Laxmi Kachhuya, TO the Soma Kujur at Jajiar 1 |
Completion of work |
-
latitude : 25.31027614,25.31027614
Longitude : 88.64466097,88.64466097
file name : Image_31082021112649058.png
|
2021-08-31 11:26:49.147226 |
27 |
34996718 |
Installation of Sub Marsible in front of the house of Monoranjan Mondal at Sakair |
150000 |
Installation of Sub Marsible in front of the house of Monoranjan Mondal at Sakair 1 |
Roof laid |
-
latitude : 25.27028357
Longitude : 88.62964561
file name : Image_02102021090504461.png
|
2021-10-02 09:05:04.56746 |
28 |
34996718 |
Installation of Sub Marsible in front of the house of Monoranjan Mondal at Sakair |
150000 |
Installation of Sub Marsible in front of the house of Monoranjan Mondal at Sakair 1 |
Plinth level |
-
latitude : 25.27023041
Longitude : 88.6296089
file name : Image_11022021124802170.png
|
2021-02-11 12:48:02.284921 |
29 |
34996718 |
Installation of Sub Marsible in front of the house of Monoranjan Mondal at Sakair |
150000 |
Installation of Sub Marsible in front of the house of Monoranjan Mondal at Sakair 1 |
Completion of work |
-
latitude : 25.27024236
Longitude : 88.62960959
file name : Image_05022021115111925.png
|
2021-02-05 11:51:12.027592 |
30 |
34885480 |
Installation of Sub-Marsible in front of the house of Faruk Hossain at Nodhan |
150000 |
Installation of Sub-Marsible in front of the house of Faruk Hossain at Nodhan 1 |
Roof laid |
-
latitude : 25.28917603
Longitude : 88.60730819
file name : Image_28062021102949487.png
|
2021-06-28 10:29:49.589702 |
31 |
34885480 |
Installation of Sub-Marsible in front of the house of Faruk Hossain at Nodhan |
150000 |
Installation of Sub-Marsible in front of the house of Faruk Hossain at Nodhan 1 |
Plinth level |
-
latitude : 25.28923444
Longitude : 88.6073561
file name : Image_02032021094201346.png
|
2021-03-02 09:42:01.484078 |
32 |
34885480 |
Installation of Sub-Marsible in front of the house of Faruk Hossain at Nodhan |
150000 |
Installation of Sub-Marsible in front of the house of Faruk Hossain at Nodhan 1 |
Completion of work |
-
latitude : 25.28919304
Longitude : 88.60734629
file name : Image_08022021113842456.png
|
2021-02-08 11:38:42.571498 |
33 |
34901574 |
Installation of Sub Marsible in front of house Jahiruddin at Uttarpara , Dwipkhanda |
150000 |
Installation of Sub Marsible in front of house Jahiruddin at Uttarpara , Dwipkhanda 1 |
Roof laid |
-
latitude : 25.30058662
Longitude : 88.59610919
file name : Image_07042021083323443.png
|
2021-04-07 08:33:23.569048 |
34 |
34901574 |
Installation of Sub Marsible in front of house Jahiruddin at Uttarpara , Dwipkhanda |
150000 |
Installation of Sub Marsible in front of house Jahiruddin at Uttarpara , Dwipkhanda 1 |
Plinth level |
-
latitude : 25.30065423
Longitude : 88.59614998
file name : Image_02032021094215763.png
|
2021-03-02 09:42:15.85868 |
35 |
34901574 |
Installation of Sub Marsible in front of house Jahiruddin at Uttarpara , Dwipkhanda |
150000 |
Installation of Sub Marsible in front of house Jahiruddin at Uttarpara , Dwipkhanda 1 |
Completion of work |
-
latitude : 25.30061142
Longitude : 88.59616071
file name : Image_11022021100229752.png
|
2021-02-11 10:02:29.824023 |
36 |
34852630 |
Installation of Sub-Marsible in front of the house of Basanti Oraw |
150000 |
Installation of Sub-Marsible in front of the house of Basanti Oraw 1 |
Roof laid |
-
latitude : 25.27609832
Longitude : 88.60402323
file name : Image_07042021083259186.png
|
2021-04-07 08:32:59.307168 |
37 |
34852630 |
Installation of Sub-Marsible in front of the house of Basanti Oraw |
150000 |
Installation of Sub-Marsible in front of the house of Basanti Oraw 1 |
Plinth level |
-
latitude : 25.27605089
Longitude : 88.60409629
file name : Image_10032021100744038.png
|
2021-03-10 10:07:44.123174 |
38 |
34852630 |
Installation of Sub-Marsible in front of the house of Basanti Oraw |
150000 |
Installation of Sub-Marsible in front of the house of Basanti Oraw 1 |
Completion of work |
-
latitude : 25.27604998
Longitude : 88.60407776
file name : Image_11022021141316954.png
|
2021-02-11 14:13:17.038411 |
39 |
34858484 |
Construction of CC road from the shop of Goutam Saha to the Senahar Bridge Jaminischinta |
300000 |
Construction of CC road from the shop of Goutam Saha to the Senahar Bridge Jaminischinta 1 |
Roof laid |
-
latitude : 25.29970979,25.2997098
Longitude : 88.63481387,88.63481389
file name : Image_27032021074713904.png
|
2021-03-27 07:47:14.006722 |
40 |
34858484 |
Construction of CC road from the shop of Goutam Saha to the Senahar Bridge Jaminischinta |
300000 |
Construction of CC road from the shop of Goutam Saha to the Senahar Bridge Jaminischinta 1 |
Plinth level |
-
latitude : 25.29968212,25.29968212
Longitude : 88.63487056,88.63487055
file name : Image_15022021162243477.png
|
2021-02-15 16:22:43.554134 |
41 |
34858484 |
Construction of CC road from the shop of Goutam Saha to the Senahar Bridge Jaminischinta |
300000 |
Construction of CC road from the shop of Goutam Saha to the Senahar Bridge Jaminischinta 1 |
Completion of work |
-
latitude : 25.29966674,25.29966349
Longitude : 88.63452449,88.6345057
file name : Image_08122020122243314.png
|
2020-12-08 12:22:43.408865 |
42 |
34746411 |
Construction of Cement concrete road from Transformar towards house of Osman at Majhikhanda Sansad |
300000 |
Construction of Cement concrete road from Transformar towards house of Osman at Majhikhanda Sansad1 |
Roof laid |
-
latitude : 25.30746179,25.30746178
Longitude : 88.60950733,88.6095074
file name : Image_05072021150003196.png
|
2021-07-05 15:00:03.320734 |
43 |
34746411 |
Construction of Cement concrete road from Transformar towards house of Osman at Majhikhanda Sansad |
300000 |
Construction of Cement concrete road from Transformar towards house of Osman at Majhikhanda Sansad1 |
Plinth level |
-
latitude : 25.30747499,25.30747499
Longitude : 88.60953401,88.60953401
file name : Image_02032021094218797.png
|
2021-03-02 09:42:18.905062 |
44 |
34746411 |
Construction of Cement concrete road from Transformar towards house of Osman at Majhikhanda Sansad |
300000 |
Construction of Cement concrete road from Transformar towards house of Osman at Majhikhanda Sansad1 |
Completion of work |
-
latitude : 25.30739341,25.30739338
Longitude : 88.60954558,88.60954551
file name : Image_18022021121332603.png
|
2021-02-18 12:13:32.692556 |
45 |
34902294 |
Construction of CC road from the Mosjid to house of Mostafa Sarkar at Shuktapara, Durgapur |
250000 |
Construction of CC road from the Mosjid to house of Mostafa Sarkar at Shuktapara, Durgapur 1 |
Completion of work |
-
latitude : 25.31548529,25.31548533
Longitude : 88.61344224,88.61344225
file name : Image_18022021121326517.png
|
2021-02-18 12:13:26.60507 |
46 |
34897346 |
Construction of CC road from house Batu Molla to Kheshipukur at Dwipkhanda |
300000 |
Construction of CC road from house Batu Molla to Kheshipukur at Dwipkhanda 1 |
Roof laid |
-
latitude : 25.30051747,25.30051749
Longitude : 88.59566286,88.59566288
file name : Image_07042021083319412.png
|
2021-04-07 08:33:19.532127 |
47 |
34897346 |
Construction of CC road from house Batu Molla to Kheshipukur at Dwipkhanda |
300000 |
Construction of CC road from house Batu Molla to Kheshipukur at Dwipkhanda 1 |
Plinth level |
-
latitude : 25.30050409,25.30049175
Longitude : 88.59569546,88.59569909
file name : Image_02032021094208748.png
|
2021-03-02 09:42:08.839891 |
48 |
34897346 |
Construction of CC road from house Batu Molla to Kheshipukur at Dwipkhanda |
300000 |
Construction of CC road from house Batu Molla to Kheshipukur at Dwipkhanda 1 |
Completion of work |
-
latitude : 25.30045229,25.30045215
Longitude : 88.59567377,88.59567386
file name : Image_18022021121323478.png
|
2021-02-18 12:13:23.558877 |
49 |
34894793 |
CC road from H/O Anowar to H/O Rofik, Darpail Sansad |
350000 |
CC road from H/O Anowar to H/O Rofik, Darpail Sansad 1 |
Roof laid |
-
latitude : 25.29574959,25.29574959
Longitude : 88.62758715,88.62758715
file name : Image_27032021074545983.png
|
2021-03-27 07:45:46.108206 |
50 |
34894793 |
CC road from H/O Anowar to H/O Rofik, Darpail Sansad |
350000 |
CC road from H/O Anowar to H/O Rofik, Darpail Sansad 1 |
Plinth level |
-
latitude : 25.29574752,25.29574751
Longitude : 88.62752703,88.62752703
file name : Image_18022021121320582.png
|
2021-02-18 12:13:20.666493 |
51 |
34894793 |
CC road from H/O Anowar to H/O Rofik, Darpail Sansad |
350000 |
CC road from H/O Anowar to H/O Rofik, Darpail Sansad 1 |
Completion of work |
-
latitude : 25.29577389,25.29577382
Longitude : 88.62761115,88.62761114
file name : Image_02022021142702850.png
|
2021-02-02 14:27:02.948244 |
52 |
34863449 |
Construction of CC road from the house Ajimuddin Miah to house of Akbar Molla at Sarifabad |
200000 |
Construction of CC road from the house Ajimuddin Miah to house of Akbar Molla at Sarifabad 1 |
Roof laid |
-
latitude : 25.28226153,25.28226153
Longitude : 88.59236374,88.59236374
file name : Image_26112021113829284.png
|
2021-11-26 11:38:29.39476 |
53 |
34863449 |
Construction of CC road from the house Ajimuddin Miah to house of Akbar Molla at Sarifabad |
200000 |
Construction of CC road from the house Ajimuddin Miah to house of Akbar Molla at Sarifabad 1 |
Plinth level |
-
latitude : 25.2821724,25.2821724
Longitude : 88.59224362,88.59224362
file name : Image_01092021092439193.png
|
2021-09-01 09:24:39.293206 |
54 |
34863449 |
Construction of CC road from the house Ajimuddin Miah to house of Akbar Molla at Sarifabad |
200000 |
Construction of CC road from the house Ajimuddin Miah to house of Akbar Molla at Sarifabad 1 |
Completion of work |
-
latitude : 25.28219777,25.28222339
Longitude : 88.59233509,88.59235411
file name : Image_28062021102942165.png
|
2021-06-28 10:29:42.284988 |
55 |
34800605 |
Bamboo Pilling from the house of Jhantu towards the house of Saddam at Majhikhanda Sansad |
150000 |
Bamboo Pilling from the house of Jhantu towards the house of Saddam at Majhikhanda Sansad1 |
Plinth level |
-
latitude : 25.31316951,25.31316951
Longitude : 88.59999445,88.59999445
file name : Image_31082021112641714.png
|
2021-08-31 11:26:41.802645 |
56 |
34800605 |
Bamboo Pilling from the house of Jhantu towards the house of Saddam at Majhikhanda Sansad |
150000 |
Bamboo Pilling from the house of Jhantu towards the house of Saddam at Majhikhanda Sansad1 |
Completion of work |
-
latitude : 25.31303265,25.31303265
Longitude : 88.59995808,88.59995808
file name : Image_28062021124332222.png
|
2021-06-28 12:43:32.326622 |
57 |
34904115 |
Bamboo Pillingfrom The Chadahati Bank Ghar towards the house of Aijul at Durgapur |
100000 |
Bamboo Pillingfrom The Chadahati Bank Ghar towards the house of Aijul at Durgapur 1 |
Roof laid |
-
latitude : 25.30866178,25.30866178
Longitude : 88.61300172,88.61300172
file name : Image_28012022123657043.png
|
2022-01-28 12:36:57.169147 |
58 |
34904115 |
Bamboo Pillingfrom The Chadahati Bank Ghar towards the house of Aijul at Durgapur |
100000 |
Bamboo Pillingfrom The Chadahati Bank Ghar towards the house of Aijul at Durgapur 1 |
Plinth level |
-
latitude : 25.30867372,25.30867303
Longitude : 88.61305098,88.61305131
file name : Image_31082021112645414.png
|
2021-08-31 11:26:45.507988 |
59 |
34904115 |
Bamboo Pillingfrom The Chadahati Bank Ghar towards the house of Aijul at Durgapur |
100000 |
Bamboo Pillingfrom The Chadahati Bank Ghar towards the house of Aijul at Durgapur 1 |
Completion of work |
-
latitude : 25.30866804,25.30866855
Longitude : 88.61308449,88.61308464
file name : Image_28062021124335109.png
|
2021-06-28 12:43:35.19966 |
60 |
34996074 |
Bamboo pilling of H/O Girin Barman to H/O Ganesh Baraman Jidra Sansad |
100000 |
Bamboo pilling of H/O Girin Barman to H/O Ganesh Baraman Jidra Sansad1 |
Roof laid |
-
latitude : 25.26130443,25.26130312
Longitude : 88.59201617,88.59201552
file name : Image_26112021113832958.png
|
2021-11-26 11:38:33.088001 |
61 |
34996074 |
Bamboo pilling of H/O Girin Barman to H/O Ganesh Baraman Jidra Sansad |
100000 |
Bamboo pilling of H/O Girin Barman to H/O Ganesh Baraman Jidra Sansad1 |
Plinth level |
-
latitude : 25.26142864,25.2614285
Longitude : 88.59210168,88.59210034
file name : Image_31082021112637960.png
|
2021-08-31 11:26:38.048733 |
62 |
34996074 |
Bamboo pilling of H/O Girin Barman to H/O Ganesh Baraman Jidra Sansad |
100000 |
Bamboo pilling of H/O Girin Barman to H/O Ganesh Baraman Jidra Sansad1 |
Completion of work |
-
latitude : 25.2614404,25.26144097
Longitude : 88.59202189,88.59202223
file name : Image_05072021145959427.png
|
2021-07-05 14:59:59.557477 |
63 |
34884569 |
Bamboo Pilling at the bank of Bhatra Dighi at Nodhan |
100000 |
Bamboo Pilling at the bank of Bhatra Dighi at Nodhan 1 |
Roof laid |
-
latitude : 25.28637497,25.28637627
Longitude : 88.61025252,88.61023492
file name : Image_02062022122831259.png
|
2022-06-02 12:28:31.358383 |
64 |
34884569 |
Bamboo Pilling at the bank of Bhatra Dighi at Nodhan |
100000 |
Bamboo Pilling at the bank of Bhatra Dighi at Nodhan 1 |
Plinth level |
-
latitude : 25.28640181,25.28640172
Longitude : 88.61025877,88.61025899
file name : Image_05042022094527240.png
|
2022-04-05 09:45:27.355905 |
65 |
34884569 |
Bamboo Pilling at the bank of Bhatra Dighi at Nodhan |
100000 |
Bamboo Pilling at the bank of Bhatra Dighi at Nodhan 1 |
Completion of work |
-
latitude : 25.28638322,25.28638227
Longitude : 88.61029542,88.6102919
file name : Image_28062021102945656.png
|
2021-06-28 10:29:45.76571 |
66 |
34898886 |
Bamboo Pilling at the bank of Khashpukur at Dwipkhanda |
100000 |
Bamboo Pilling at the bank of Khashpukur at Dwipkhanda 1 |
Plinth level |
-
latitude : 25.3026193,25.3026193
Longitude : 88.62133608,88.62133608
file name : Image_14042022094324176.png
|
2022-04-14 09:43:24.296277 |
67 |
34898886 |
Bamboo Pilling at the bank of Khashpukur at Dwipkhanda |
100000 |
Bamboo Pilling at the bank of Khashpukur at Dwipkhanda 1 |
Completion of work |
-
latitude : 25.30119808,25.30119989
Longitude : 88.59734816,88.59732485
file name : Image_28062021124344763.png
|
2021-06-28 12:43:44.864522 |
68 |
46840096 |
Installation of Solar Sub-Marsible Pump with reserver in Front of house of Barun Mahato at Kistapur |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of house of Barun Mahato at Kistapur1 |
Roof laid |
-
latitude : 25.27307406,25.27307143
Longitude : 88.60397846,88.60398459
file name : Image_22082022093853597.png
|
2022-08-22 09:38:53.712229 |
69 |
46840096 |
Installation of Solar Sub-Marsible Pump with reserver in Front of house of Barun Mahato at Kistapur |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of house of Barun Mahato at Kistapur1 |
Plinth level |
-
latitude : 25.2729782,25.27297774
Longitude : 88.60407648,88.60407502
file name : Image_27072022093010978.png
|
2022-07-27 09:30:11.08162 |
70 |
46840096 |
Installation of Solar Sub-Marsible Pump with reserver in Front of house of Barun Mahato at Kistapur |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of house of Barun Mahato at Kistapur1 |
Completion of work |
-
latitude : 25.27291868,25.27291868
Longitude : 88.60407172,88.60407172
file name : Image_28032022095513501.png
|
2022-03-28 09:55:13.635581 |
71 |
46840096 |
Installation of Solar Sub-Marsible Pump with reserver in Front of house of Barun Mahato at Kistapur |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of house of Barun Mahato at Kistapur1 |
Completion of work |
-
latitude : 25.27291868,25.27291868
Longitude : 88.60407172,88.60407172
file name : Image_28032022095549493.png
|
2022-03-28 09:55:49.593739 |
72 |
46841667 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Jullu Rahaman at Jas |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Jullu Rahaman at Jas1 |
Roof laid |
-
latitude : 25.27474069,25.27473671
Longitude : 88.58604343,88.5860407
file name : Image_22082022093845451.png
|
2022-08-22 09:38:45.572808 |
73 |
46841667 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Jullu Rahaman at Jas |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Jullu Rahaman at Jas1 |
Plinth level |
-
latitude : 25.27474405,25.27474405
Longitude : 88.58596411,88.58596411
file name : Image_27072022093005830.png
|
2022-07-27 09:30:05.944374 |
74 |
46841667 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Jullu Rahaman at Jas |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Jullu Rahaman at Jas1 |
Completion of work |
-
latitude : 25.2747112,25.27471126
Longitude : 88.5858778,88.58587783
file name : Image_23032022103831663.png
|
2022-03-23 10:38:31.7629 |
75 |
57848758 |
Pucca Drain With cover From Dwipkhanda Batu Molla House Towards Bara Damuya house Dwipkhanda |
300000 |
Pucca Drain With cover From Dwipkhanda Batu Molla House Towards Bara Damuya house Dwipkhanda 1 |
Plinth level |
-
latitude : 25.30071256,25.30071387
Longitude : 88.59545058,88.5954485
file name : Image_14012024103229692.png
|
2024-01-14 10:32:29.75368 |
76 |
57848758 |
Pucca Drain With cover From Dwipkhanda Batu Molla House Towards Bara Damuya house Dwipkhanda |
300000 |
Pucca Drain With cover From Dwipkhanda Batu Molla House Towards Bara Damuya house Dwipkhanda 1 |
Plinth level |
-
latitude : 25.30080693,25.30080767
Longitude : 88.59546526,88.59546204
file name : Image_30122023135301722.png
|
2023-12-30 13:53:01.799304 |
77 |
57848758 |
Pucca Drain With cover From Dwipkhanda Batu Molla House Towards Bara Damuya house Dwipkhanda |
300000 |
Pucca Drain With cover From Dwipkhanda Batu Molla House Towards Bara Damuya house Dwipkhanda 1 |
Plinth level |
-
latitude : 25.3008051,25.30083057
Longitude : 88.59549038,88.5954385
file name : Image_30122023135156530.png
|
2023-12-30 13:51:56.602522 |
78 |
57848758 |
Pucca Drain With cover From Dwipkhanda Batu Molla House Towards Bara Damuya house Dwipkhanda |
300000 |
Pucca Drain With cover From Dwipkhanda Batu Molla House Towards Bara Damuya house Dwipkhanda 1 |
Completion of work |
-
latitude : 25.30079797,25.30078004
Longitude : 88.59528368,88.59527086
file name : Image_06062023131755550.png
|
2023-06-06 13:17:55.6687 |
79 |
46839397 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Chakahar ICDS Centre at Jajiar S |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Chakahar ICDS Centre at Jajiar S1 |
Roof laid |
-
latitude : 25.30955838,25.30955836
Longitude : 88.64371161,88.64371158
file name : Image_02092022124826999.png
|
2022-09-02 12:48:27.119289 |
80 |
46839397 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Chakahar ICDS Centre at Jajiar S |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Chakahar ICDS Centre at Jajiar S1 |
Plinth level |
-
latitude : 25.30955873,25.30955528
Longitude : 88.6436826,88.64368165
file name : Image_24082022121607939.png
|
2022-08-24 12:16:08.062259 |
81 |
46839397 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Chakahar ICDS Centre at Jajiar S |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Chakahar ICDS Centre at Jajiar S1 |
Completion of work |
-
latitude : 25.3094418,25.30944192
Longitude : 88.64363306,88.64363121
file name : Image_28032022095537581.png
|
2022-03-28 09:55:37.693572 |
82 |
46839397 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Chakahar ICDS Centre at Jajiar S |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Chakahar ICDS Centre at Jajiar S1 |
Completion of work |
-
latitude : 25.3094418,25.30944192
Longitude : 88.64363306,88.64363121
file name : Image_28032022095603194.png
|
2022-03-28 09:56:03.300327 |
83 |
46833832 |
Construction of Cement Concrete/Bricks Drain from Bedkuri towords the house of Sripada at Jasrai |
350000 |
Construction of Cement Concrete/Bricks Drain from Bedkuri towords the house of Sripada at Jasrai 1 |
Roof laid |
-
latitude : 25.27501459,25.27502459
Longitude : 88.58701128,88.58701131
file name : Image_27072022093000457.png
|
2022-07-27 09:30:00.56109 |
84 |
46833832 |
Construction of Cement Concrete/Bricks Drain from Bedkuri towords the house of Sripada at Jasrai |
350000 |
Construction of Cement Concrete/Bricks Drain from Bedkuri towords the house of Sripada at Jasrai 1 |
Plinth level |
-
latitude : 25.27530591,25.27528848
Longitude : 88.58700008,88.58701084
file name : Image_06072022143641145.png
|
2022-07-06 14:36:41.249026 |
85 |
46833832 |
Construction of Cement Concrete/Bricks Drain from Bedkuri towords the house of Sripada at Jasrai |
350000 |
Construction of Cement Concrete/Bricks Drain from Bedkuri towords the house of Sripada at Jasrai 1 |
Completion of work |
-
latitude : 25.27587878,25.27587878
Longitude : 88.58714761,88.58714761
file name : Image_24032022150356338.png
|
2022-03-24 15:03:56.446511 |
86 |
46839691 |
Installation of Solar Sub-Marsible Pump with reserver in Front of house of Siddik Mill at Jidhra S |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of house of Siddik Mill at Jidhra S1 |
Roof laid |
-
latitude : 25.26251286,25.26251286
Longitude : 88.6003495,88.60034952
file name : Image_22082022093849416.png
|
2022-08-22 09:38:49.534994 |
87 |
46839691 |
Installation of Solar Sub-Marsible Pump with reserver in Front of house of Siddik Mill at Jidhra S |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of house of Siddik Mill at Jidhra S1 |
Plinth level |
-
latitude : 25.26248318,25.26248318
Longitude : 88.60036548,88.60036548
file name : Image_27072022092956319.png
|
2022-07-27 09:29:56.433539 |
88 |
46839691 |
Installation of Solar Sub-Marsible Pump with reserver in Front of house of Siddik Mill at Jidhra S |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of house of Siddik Mill at Jidhra S1 |
Completion of work |
-
latitude : 25.26253222,25.26253222
Longitude : 88.60035068,88.60035068
file name : Image_28032022095523333.png
|
2022-03-28 09:55:23.454278 |
89 |
46839691 |
Installation of Solar Sub-Marsible Pump with reserver in Front of house of Siddik Mill at Jidhra S |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of house of Siddik Mill at Jidhra S1 |
Completion of work |
-
latitude : 25.26253222,25.26253222
Longitude : 88.60035068,88.60035068
file name : Image_28032022095553641.png
|
2022-03-28 09:55:53.755103 |
90 |
34856068 |
Bamboo Pilling at the bank of Mojarul Pond at Jajiar Sansad |
70000 |
Bamboo Pilling at the bank of Mojarul Pond at Jajiar Sansad 1 |
Roof laid |
-
latitude : 25.30030903,25.30030903
Longitude : 88.63542493,88.63542493
file name : Image_01072022091113247.png
|
2022-07-01 09:11:13.334443 |
91 |
34856068 |
Bamboo Pilling at the bank of Mojarul Pond at Jajiar Sansad |
70000 |
Bamboo Pilling at the bank of Mojarul Pond at Jajiar Sansad 1 |
Plinth level |
-
latitude : 25.30030274,25.30030264
Longitude : 88.63542965,88.63542805
file name : Image_08062022100939261.png
|
2022-06-08 10:09:39.350288 |
92 |
34856068 |
Bamboo Pilling at the bank of Mojarul Pond at Jajiar Sansad |
70000 |
Bamboo Pilling at the bank of Mojarul Pond at Jajiar Sansad 1 |
Completion of work |
-
latitude : 25.30035629,25.30036375
Longitude : 88.63538931,88.63538927
file name : Image_05072021150048976.png
|
2021-07-05 15:00:49.071817 |
93 |
48631634 |
Supply of Mark II materials for Repairing and Resinking |
250000 |
Supply of Mark II materials for Repairing and Resinking 1 |
Completion of work |
-
latitude : 25.2963231
Longitude : 88.6316232
file name : Image_26032022082723175.png
|
2022-03-26 08:27:23.270883 |
94 |
48631634 |
Supply of Mark II materials for Repairing and Resinking |
250000 |
Supply of Mark II materials for Repairing and Resinking 2 |
Completion of work |
-
latitude : 25.2963236
Longitude : 88.6316253
file name : Image_26032022082613167.png
|
2022-03-26 08:26:13.30969 |
95 |
48631634 |
Supply of Mark II materials for Repairing and Resinking |
250000 |
Supply of Mark II materials for Repairing and Resinking 2 |
Completion of work |
-
latitude : 25.2963236
Longitude : 88.6316253
file name : Image_26032022082729704.png
|
2022-03-26 08:27:29.841193 |
96 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP1 |
Plinth level |
-
latitude : 25.29619307
Longitude : 88.63179449
file name : Image_26032022082755720.png
|
2022-03-26 08:27:55.816086 |
97 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP1 |
Plinth level |
-
latitude : 25.29359822
Longitude : 88.62919397
file name : Image_28032022095418558.png
|
2022-03-28 09:54:18.687031 |
98 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP1 |
Plinth level |
-
latitude : 25.29335754
Longitude : 88.62826269
file name : Image_28032022095424641.png
|
2022-03-28 09:54:24.752637 |
99 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP1 |
Plinth level |
-
latitude : 25.29328334
Longitude : 88.62766784
file name : Image_28032022095431991.png
|
2022-03-28 09:54:32.104856 |
100 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP1 |
Plinth level |
-
latitude : 25.2929229
Longitude : 88.62592114
file name : Image_28032022095438879.png
|
2022-03-28 09:54:38.991366 |
101 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP1 |
Plinth level |
-
latitude : 25.29240242
Longitude : 88.62499413
file name : Image_28032022095444361.png
|
2022-03-28 09:54:44.474159 |
102 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP1 |
Plinth level |
-
latitude : 25.28899399
Longitude : 88.61364311
file name : Image_28032022095449597.png
|
2022-03-28 09:54:49.707438 |
103 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP1 |
Plinth level |
-
latitude : 25.29034841
Longitude : 88.61283136
file name : Image_28032022095505780.png
|
2022-03-28 09:55:05.882084 |
104 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP1 |
Plinth level |
-
latitude : 25.29034841
Longitude : 88.61283136
file name : Image_28032022095543056.png
|
2022-03-28 09:55:43.152958 |
105 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP1 |
Plinth level |
-
latitude : 25.29619307
Longitude : 88.63179449
file name : Image_26032022082648082.png
|
2022-03-26 08:26:48.180176 |
106 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP1 |
Completion of work |
-
latitude : 25.2963237
Longitude : 88.6316277
file name : Image_24032022150313329.png
|
2022-03-24 15:03:13.43654 |
107 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP2 |
Completion of work |
-
latitude : 25.29578266
Longitude : 88.63125806
file name : Image_26032022082714793.png
|
2022-03-26 08:27:14.888171 |
108 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP2 |
Completion of work |
-
latitude : 25.29578266
Longitude : 88.63125806
file name : Image_26032022082816508.png
|
2022-03-26 08:28:16.608814 |
109 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP2 |
Completion of work |
-
latitude : 25.29391781
Longitude : 88.63038264
file name : Image_24032022150319027.png
|
2022-03-24 15:03:19.116826 |
110 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP3 |
Completion of work |
-
latitude : 25.2935968
Longitude : 88.62922504
file name : Image_24032022150323433.png
|
2022-03-24 15:03:23.525663 |
111 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP4 |
Completion of work |
-
latitude : 25.29338436
Longitude : 88.62826782
file name : Image_24032022150327894.png
|
2022-03-24 15:03:27.985717 |
112 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP5 |
Completion of work |
-
latitude : 25.29325719
Longitude : 88.62768492
file name : Image_24032022150332831.png
|
2022-03-24 15:03:32.913194 |
113 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP6 |
Completion of work |
-
latitude : 25.29299973
Longitude : 88.62594192
file name : Image_24032022150337225.png
|
2022-03-24 15:03:37.325435 |
114 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP7 |
Completion of work |
-
latitude : 25.29243399
Longitude : 88.62502832
file name : Image_24032022150342677.png
|
2022-03-24 15:03:42.769999 |
115 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP8 |
Completion of work |
-
latitude : 25.28991845
Longitude : 88.61735725
file name : Image_24032022150347858.png
|
2022-03-24 15:03:47.97036 |
116 |
48631810 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP |
350000 |
Mark II Tubewell Labour Wages at Different Sansad at Dawipkhanda GP9 |
Completion of work |
-
latitude : 25.2903858
Longitude : 88.61286586
file name : Image_24032022150352052.png
|
2022-03-24 15:03:52.14219 |
117 |
34905565 |
Installation of Sub Marsible in front of the house of Akbar Mandal at Chandahati |
150000 |
Installation of Sub Marsible in front of the house of Akbar Mandal at Chandahati 1 |
Roof laid |
-
latitude : 25.30891436
Longitude : 88.61401235
file name : Image_29032022100528724.png
|
2022-03-29 10:05:28.834563 |
118 |
34905565 |
Installation of Sub Marsible in front of the house of Akbar Mandal at Chandahati |
150000 |
Installation of Sub Marsible in front of the house of Akbar Mandal at Chandahati 1 |
Plinth level |
-
latitude : 25.30890651
Longitude : 88.61399823
file name : Image_23032022103822028.png
|
2022-03-23 10:38:22.142163 |
119 |
34905565 |
Installation of Sub Marsible in front of the house of Akbar Mandal at Chandahati |
150000 |
Installation of Sub Marsible in front of the house of Akbar Mandal at Chandahati 1 |
Completion of work |
-
latitude : 25.30892526
Longitude : 88.61400555
file name : Image_28012022123701140.png
|
2022-01-28 12:37:01.288728 |
120 |
34904753 |
Installation of Sub Marsible in front of the house of Fayjuddin Mandan at Durgapur |
150000 |
Installation of Sub Marsible in front of the house of Fayjuddin Mandan at Durgapur 1 |
Roof laid |
-
latitude : 25.3071271
Longitude : 88.61643671
file name : Image_29032022100532850.png
|
2022-03-29 10:05:32.956813 |
121 |
34904753 |
Installation of Sub Marsible in front of the house of Fayjuddin Mandan at Durgapur |
150000 |
Installation of Sub Marsible in front of the house of Fayjuddin Mandan at Durgapur 1 |
Plinth level |
-
latitude : 25.30261325
Longitude : 88.62137154
file name : Image_23032022103818565.png
|
2022-03-23 10:38:18.675362 |
122 |
34904753 |
Installation of Sub Marsible in front of the house of Fayjuddin Mandan at Durgapur |
150000 |
Installation of Sub Marsible in front of the house of Fayjuddin Mandan at Durgapur 1 |
Completion of work |
-
latitude : 25.3071426
Longitude : 88.61640931
file name : Image_28012022124917176.png
|
2022-01-28 12:49:17.338748 |
123 |
57895168 |
Contruction of Soak pit front of Raju house at Chandahat Durgapur |
5000 |
Contruction of Soak pit front of Raju house at Chandahat Durgapur1 |
Completion of work |
-
latitude : 25.30760094
Longitude : 88.61742767
file name : Image_01082023164807904.png
|
2023-08-01 16:48:08.003246 |
124 |
57886922 |
Construction of Soak pit Front Of Panjara adibasipara at Darpail |
5000 |
Construction of Soak pit Front Of Panjara adibasipara at Darpail1 |
Completion of work |
-
latitude : 25.29826632
Longitude : 88.63861974
file name : Image_26072023111141898.png
|
2023-07-26 11:11:41.995018 |
125 |
57889721 |
Construction of Soak Pit front of Ganesh Hansad house at Jidhra |
5000 |
Construction of Soak Pit front of Ganesh Hansad house at Jidhra1 |
Completion of work |
-
latitude : 25.26391292
Longitude : 88.60043497
file name : Image_27072023093113001.png
|
2023-07-27 09:31:13.114778 |
126 |
48632344 |
Supply of Mark II Materials for Reapairing and Resinking at Different Sansad at Dwipkhanda GP nos 25 |
230000 |
Supply of Mark II Materials for Reapairing and Resinking at Different Sansad at Dwipkhanda GP nos 251 |
Completion of work |
-
latitude : 25.2962824
Longitude : 88.6316045
file name : Image_09092022114055520.png
|
2022-09-09 11:40:55.624541 |
127 |
46545887 |
Construction/Repairing/Renovation of Dwipkhanda Gram Panchayat Office Building at Daralhat at Jamini |
1548839 |
Construction/Repairing/Renovation of Dwipkhanda Gram Panchayat Office Building at Daralhat at Jamini1 |
Completion of work |
-
latitude : 25.29624985
Longitude : 88.63152995
file name : Image_18032022092811803.png
|
2022-03-18 09:28:11.903072 |
128 |
46841158 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Gopal at Darpail at D |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Gopal at Darpail at D1 |
Roof laid |
-
latitude : 25.29561815,25.29561826
Longitude : 88.63478796,88.63478776
file name : Image_22092022090107590.png
|
2022-09-22 09:01:07.714183 |
129 |
46841158 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Gopal at Darpail at D |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Gopal at Darpail at D1 |
Plinth level |
-
latitude : 25.29558606,25.29558606
Longitude : 88.63476993,88.63476993
file name : Image_20092022113233744.png
|
2022-09-20 11:32:33.865852 |
130 |
46841158 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Gopal at Darpail at D |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Gopal at Darpail at D1 |
Completion of work |
-
latitude : 25.29563404,25.29563404
Longitude : 88.63479832,88.63479832
file name : Image_19092022140541186.png
|
2022-09-19 14:05:41.300982 |
131 |
46841158 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Gopal at Darpail at D |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Gopal at Darpail at D1 |
Completion of work |
-
latitude : 25.2955893,25.29559082
Longitude : 88.63480229,88.63480269
file name : Image_28032022095527023.png
|
2022-03-28 09:55:27.134955 |
132 |
46841158 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Gopal at Darpail at D |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Gopal at Darpail at D1 |
Completion of work |
-
latitude : 25.2955893,25.29559082
Longitude : 88.63480229,88.63480269
file name : Image_28032022095557068.png
|
2022-03-28 09:55:57.175374 |
133 |
46541978 |
Construction of Cement Concrete Road from the house of Jhantu Sarkar towords the Culvert at Karnja |
250000 |
Construction of Cement Concrete Road from the house of Jhantu Sarkar towords the Culvert at Karnja1 |
Roof laid |
-
latitude : 25.31323594,25.3132345
Longitude : 88.59986714,88.59986781
file name : Image_12012023113717003.png
|
2023-01-12 11:37:17.109344 |
134 |
46541978 |
Construction of Cement Concrete Road from the house of Jhantu Sarkar towords the Culvert at Karnja |
250000 |
Construction of Cement Concrete Road from the house of Jhantu Sarkar towords the Culvert at Karnja1 |
Plinth level |
-
latitude : 25.31327396,25.31327396
Longitude : 88.59982953,88.59982953
file name : Image_03122022110802908.png
|
2022-12-03 11:08:02.994762 |
135 |
46541978 |
Construction of Cement Concrete Road from the house of Jhantu Sarkar towords the Culvert at Karnja |
250000 |
Construction of Cement Concrete Road from the house of Jhantu Sarkar towords the Culvert at Karnja1 |
Completion of work |
-
latitude : 25.29659367,25.29659367
Longitude : 88.63126492,88.63126492
file name : Image_25112022133128146.png
|
2022-11-25 13:31:28.23936 |
136 |
34806872 |
Installation of Sub-Marsible in front of the house of Iyakub at Majhikhanda Sansad |
150000 |
Installation of Sub-Marsible in front of the house of Iyakub at Majhikhanda Sansad1 |
Roof laid |
-
latitude : 25.31375979
Longitude : 88.6032045
file name : Image_02062022122825624.png
|
2022-06-02 12:28:25.71809 |
137 |
34806872 |
Installation of Sub-Marsible in front of the house of Iyakub at Majhikhanda Sansad |
150000 |
Installation of Sub-Marsible in front of the house of Iyakub at Majhikhanda Sansad1 |
Plinth level |
-
latitude : 25.31379233
Longitude : 88.60329886
file name : Image_05042022091822299.png
|
2022-04-05 09:18:22.430717 |
138 |
34806872 |
Installation of Sub-Marsible in front of the house of Iyakub at Majhikhanda Sansad |
150000 |
Installation of Sub-Marsible in front of the house of Iyakub at Majhikhanda Sansad1 |
Completion of work |
-
latitude : 25.31380228
Longitude : 88.60323404
file name : Image_28012022123705324.png
|
2022-01-28 12:37:05.511121 |
139 |
34903133 |
Construction of CC Drain from house Rasidul to house of Mansur Molla at Vakuya , Durgapur |
200000 |
Construction of CC Drain from house Rasidul to house of Mansur Molla at Vakuya , Durgapur 1 |
Roof laid |
-
latitude : 25.3156679,25.3156679
Longitude : 88.61927964,88.61927964
file name : Image_05042022091812584.png
|
2022-04-05 09:18:12.702608 |
140 |
34903133 |
Construction of CC Drain from house Rasidul to house of Mansur Molla at Vakuya , Durgapur |
200000 |
Construction of CC Drain from house Rasidul to house of Mansur Molla at Vakuya , Durgapur 1 |
Plinth level |
-
latitude : 25.31569175,25.31569175
Longitude : 88.61917676,88.61917676
file name : Image_28012022123652782.png
|
2022-01-28 12:36:52.905653 |
141 |
34903133 |
Construction of CC Drain from house Rasidul to house of Mansur Molla at Vakuya , Durgapur |
200000 |
Construction of CC Drain from house Rasidul to house of Mansur Molla at Vakuya , Durgapur 1 |
Completion of work |
-
latitude : 25.31557167,25.31557167
Longitude : 88.61959551,88.61959549
file name : Image_18022021121329583.png
|
2021-02-18 12:13:29.678969 |
142 |
46840601 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Shibmandir at Jaminischinta Sansa |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Shibmandir at Jaminischinta Sansa1 |
Roof laid |
-
latitude : 25.2989677,25.2989677
Longitude : 88.63602078,88.63602078
file name : Image_11072022135031924.png
|
2022-07-11 13:50:32.064339 |
143 |
46840601 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Shibmandir at Jaminischinta Sansa |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Shibmandir at Jaminischinta Sansa1 |
Plinth level |
-
latitude : 25.29905393,25.29905392
Longitude : 88.63577024,88.63577022
file name : Image_01072022093149289.png
|
2022-07-01 09:31:49.38614 |
144 |
46840601 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Shibmandir at Jaminischinta Sansa |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Shibmandir at Jaminischinta Sansa1 |
Completion of work |
-
latitude : 25.29894076,25.29894076
Longitude : 88.63602634,88.63602634
file name : Image_28032022095531820.png
|
2022-03-28 09:55:31.918038 |
145 |
46840601 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Shibmandir at Jaminischinta Sansa |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Shibmandir at Jaminischinta Sansa1 |
Completion of work |
-
latitude : 25.29894076,25.29894076
Longitude : 88.63602634,88.63602634
file name : Image_28032022095600145.png
|
2022-03-28 09:56:00.245771 |
146 |
46842596 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Monoranjan at Sakair |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Monoranjan at Sakair1 |
Roof laid |
-
latitude : 25.26641438,25.26642797
Longitude : 88.62697316,88.62696788
file name : Image_11072022135028480.png
|
2022-07-11 13:50:28.622029 |
147 |
46842596 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Monoranjan at Sakair |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Monoranjan at Sakair1 |
Plinth level |
-
latitude : 25.26652924,25.26652924
Longitude : 88.62697117,88.62697117
file name : Image_11072022092259627.png
|
2022-07-11 09:22:59.724812 |
148 |
46842596 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Monoranjan at Sakair |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Monoranjan at Sakair1 |
Completion of work |
-
latitude : 25.26645334,25.26645344
Longitude : 88.6269335,88.62693344
file name : Image_27052022160252895.png
|
2022-05-27 16:02:52.991839 |
149 |
34997534 |
Installation of Sub Marsible in front of the house of Mantu Mahato at Shivrampur Sakair |
150000 |
Installation of Sub Marsible in front of the house of Mantu Mahato at Shivrampur Sakair 1 |
Completion of work |
-
latitude : 25.25495355
Longitude : 88.60996246
file name : Image_03112021133848251.png
|
2021-11-03 13:38:48.354721 |
150 |
57878345 |
Purchase of Mark II Materials |
849300 |
Purchase of Mark II Materials1 |
Completion of work |
-
latitude : 25.2963232
Longitude : 88.6315707
file name : Image_02032023110700967.png
|
2023-03-02 11:07:01.06059 |
151 |
57878345 |
Purchase of Mark II Materials |
849300 |
Purchase of Mark II Materials1 |
Completion of work |
-
latitude : 25.296323
Longitude : 88.6315703
file name : Image_02032023110956104.png
|
2023-03-02 11:09:56.201887 |
152 |
34889332 |
Construction of CC road from house RabindraNath Sarkar to Auli Mondir at Bhaginagar |
200000 |
Construction of CC road from house RabindraNath Sarkar to Auli Mondir at Bhaginagar 1 |
Roof laid |
-
latitude : 25.2962771,25.2962771
Longitude : 88.6315898,88.6315898
file name : Image_10122021122704826.png
|
2021-12-10 12:27:04.924657 |
153 |
34889332 |
Construction of CC road from house RabindraNath Sarkar to Auli Mondir at Bhaginagar |
200000 |
Construction of CC road from house RabindraNath Sarkar to Auli Mondir at Bhaginagar 1 |
Plinth level |
-
latitude : 25.27831297,25.27831297
Longitude : 88.62991609,88.62991609
file name : Image_27112021092031855.png
|
2021-11-27 09:20:31.961487 |
154 |
34889332 |
Construction of CC road from house RabindraNath Sarkar to Auli Mondir at Bhaginagar |
200000 |
Construction of CC road from house RabindraNath Sarkar to Auli Mondir at Bhaginagar 1 |
Completion of work |
-
latitude : 25.27832154,25.27832249
Longitude : 88.63031753,88.63031626
file name : Image_01092021092455215.png
|
2021-09-01 09:24:55.31734 |
155 |
34855663 |
Construction of CC road from moksedul towards the Talpukur at Jajiar Sansad |
200000 |
Construction of CC road from moksedul towards the Talpukur at Jajiar Sansad 1 |
Roof laid |
-
latitude : 25.30261212,25.30261212
Longitude : 88.63564845,88.63564845
file name : Image_10122021122654481.png
|
2021-12-10 12:26:54.584889 |
156 |
34855663 |
Construction of CC road from moksedul towards the Talpukur at Jajiar Sansad |
200000 |
Construction of CC road from moksedul towards the Talpukur at Jajiar Sansad 1 |
Plinth level |
-
latitude : 25.2962544,25.2962544
Longitude : 88.6316205,88.6316205
file name : Image_26112021113839822.png
|
2021-11-26 11:38:39.931333 |
157 |
34855663 |
Construction of CC road from moksedul towards the Talpukur at Jajiar Sansad |
200000 |
Construction of CC road from moksedul towards the Talpukur at Jajiar Sansad 1 |
Completion of work |
-
latitude : 25.30259701,25.30259701
Longitude : 88.63566751,88.63566752
file name : Image_05072021150029188.png
|
2021-07-05 15:00:29.304303 |
158 |
34855663 |
Construction of CC road from moksedul towards the Talpukur at Jajiar Sansad |
200000 |
Construction of CC road from moksedul towards the Talpukur at Jajiar Sansad 1 |
Completion of work |
-
latitude : 25.2630621,25.26306356
Longitude : 88.58689484,88.58689559
file name : Image_28062021102933233.png
|
2021-06-28 10:29:33.314816 |
159 |
34850979 |
Construction of CC road from the house of Ajgar Miah towards Bilaikuri |
300000 |
Construction of CC road from the house of Ajgar Miah towards Bilaikuri 1 |
Roof laid |
-
latitude : 25.27440678,25.27440678
Longitude : 88.60239662,88.60239662
file name : Image_28012022123721360.png
|
2022-01-28 12:37:21.479399 |
160 |
34850979 |
Construction of CC road from the house of Ajgar Miah towards Bilaikuri |
300000 |
Construction of CC road from the house of Ajgar Miah towards Bilaikuri 1 |
Plinth level |
-
latitude : 25.27446325,25.27446325
Longitude : 88.60246791,88.60246791
file name : Image_29112021111255924.png
|
2021-11-29 11:12:56.04306 |
161 |
34850979 |
Construction of CC road from the house of Ajgar Miah towards Bilaikuri |
300000 |
Construction of CC road from the house of Ajgar Miah towards Bilaikuri 1 |
Completion of work |
-
latitude : 25.27223046,25.27222831
Longitude : 88.60226366,88.60226616
file name : Image_28062021102938735.png
|
2021-06-28 10:29:38.851106 |
162 |
34860497 |
Installation of Sub-Marsible Tubewell in front of Sripada Malo at Jaminischinta |
150000 |
Installation of Sub-Marsible Tubewell in front of Sripada Malo at Jaminischinta 1 |
Roof laid |
-
latitude : 25.29832768
Longitude : 88.63451231
file name : Image_10122021122659503.png
|
2021-12-10 12:26:59.609222 |
163 |
34860497 |
Installation of Sub-Marsible Tubewell in front of Sripada Malo at Jaminischinta |
150000 |
Installation of Sub-Marsible Tubewell in front of Sripada Malo at Jaminischinta 1 |
Plinth level |
-
latitude : 25.29622913
Longitude : 88.63182456
file name : Image_03112021094003677.png
|
2021-11-03 09:40:03.770824 |
164 |
34860497 |
Installation of Sub-Marsible Tubewell in front of Sripada Malo at Jaminischinta |
150000 |
Installation of Sub-Marsible Tubewell in front of Sripada Malo at Jaminischinta 1 |
Completion of work |
-
latitude : 25.29825514
Longitude : 88.63459523
file name : Image_02102021090521284.png
|
2021-10-02 09:05:21.415538 |
165 |
34866674 |
Installation of Sub Marsible in front of house of Badni Tudu at Sarifabad |
150000 |
Installation of Sub Marsible in front of house of Badni Tudu at Sarifabad 1 |
Roof laid |
-
latitude : 25.27430552
Longitude : 88.59309743
file name : Image_26112021113825384.png
|
2021-11-26 11:38:25.519068 |
166 |
34866674 |
Installation of Sub Marsible in front of house of Badni Tudu at Sarifabad |
150000 |
Installation of Sub Marsible in front of house of Badni Tudu at Sarifabad 1 |
Plinth level |
-
latitude : 25.27433357
Longitude : 88.59309318
file name : Image_02102021090445335.png
|
2021-10-02 09:04:45.43962 |
167 |
34895513 |
Installation of Sub Marsible in front of the house Faijuddin at Bejahar Darpail |
150000 |
Installation of Sub Marsible in front of the house Faijuddin at Bejahar Darpail 1 |
Plinth level |
-
latitude : 25.29325797
Longitude : 88.62951748
file name : Image_03112021094010012.png
|
2021-11-03 09:40:10.107169 |
168 |
34895513 |
Installation of Sub Marsible in front of the house Faijuddin at Bejahar Darpail |
150000 |
Installation of Sub Marsible in front of the house Faijuddin at Bejahar Darpail 1 |
Completion of work |
-
latitude : 25.29325317
Longitude : 88.62948137
file name : Image_02102021090515300.png
|
2021-10-02 09:05:15.394896 |
169 |
34895513 |
Installation of Sub Marsible in front of the house Faijuddin at Bejahar Darpail |
150000 |
Installation of Sub Marsible in front of the house Faijuddin at Bejahar Darpail 1 |
Plinth level |
-
latitude : 25.29322597
Longitude : 88.62948167
file name : Image_03102021103032636.png
|
2021-10-03 10:30:32.742853 |
170 |
34860938 |
Installation of Sub-Marsible in front of house Bhubeneswar house at Jaminischinta |
150000 |
Installation of Sub-Marsible in front of house Bhubeneswar house at Jaminischinta 1 |
Roof laid |
-
latitude : 25.2963221
Longitude : 88.6315714
file name : Image_17032023161732225.png
|
2023-03-17 16:17:32.369433 |
171 |
34860938 |
Installation of Sub-Marsible in front of house Bhubeneswar house at Jaminischinta |
150000 |
Installation of Sub-Marsible in front of house Bhubeneswar house at Jaminischinta 1 |
Plinth level |
-
latitude : 25.2963466
Longitude : 88.6316082
file name : Image_02102021090510092.png
|
2021-10-02 09:05:10.180935 |
172 |
34860938 |
Installation of Sub-Marsible in front of house Bhubeneswar house at Jaminischinta |
150000 |
Installation of Sub-Marsible in front of house Bhubeneswar house at Jaminischinta 1 |
Roof laid |
-
latitude : 25.2962751
Longitude : 88.6315907
file name : Image_03102021103046357.png
|
2021-10-03 10:30:46.442387 |
173 |
34860938 |
Installation of Sub-Marsible in front of house Bhubeneswar house at Jaminischinta |
150000 |
Installation of Sub-Marsible in front of house Bhubeneswar house at Jaminischinta 1 |
Completion of work |
-
latitude : 25.2963466
Longitude : 88.6316084
file name : Image_09092021141830709.png
|
2021-09-09 14:18:30.811162 |
174 |
34861344 |
Construction of CCroad from the land Dwipesh Ghosh to the land of Amiya Pramanik at Jidra |
300000 |
Construction of CCroad from the land Dwipesh Ghosh to the land of Amiya Pramanik at Jidra 1 |
Roof laid |
-
latitude : 25.2965204,25.2965204
Longitude : 88.63106817,88.63106817
file name : Image_02102021090434425.png
|
2021-10-02 09:04:34.527705 |
175 |
34896286 |
Installation of Sub Marsible in front of Bortala at Darpail |
150000 |
Installation of Sub Marsible in front of Bortala at Darpail 1 |
Plinth level |
-
latitude : 25.29820781
Longitude : 88.63830899
file name : Image_02102021090527774.png
|
2021-10-02 09:05:27.879974 |
176 |
34896286 |
Installation of Sub Marsible in front of Bortala at Darpail |
150000 |
Installation of Sub Marsible in front of Bortala at Darpail 1 |
Completion of work |
-
latitude : 25.29819434
Longitude : 88.63840647
file name : Image_15022021162228547.png
|
2021-02-15 16:22:28.618256 |
177 |
34995311 |
Construction of CC road from the house Kamal Barman to house of Bikash Barman at Sakair |
200000 |
Construction of CC road from the house Kamal Barman to house of Bikash Barman at Sakair 1 |
Roof laid |
-
latitude : 25.26486415,25.26486415
Longitude : 88.62998557,88.62998557
file name : Image_03112021133853310.png
|
2021-11-03 13:38:53.425447 |
178 |
34995311 |
Construction of CC road from the house Kamal Barman to house of Bikash Barman at Sakair |
200000 |
Construction of CC road from the house Kamal Barman to house of Bikash Barman at Sakair 1 |
Plinth level |
-
latitude : 25.26496801,25.26496801
Longitude : 88.6299558,88.6299558
file name : Image_02102021090457574.png
|
2021-10-02 09:04:57.65847 |
179 |
34995311 |
Construction of CC road from the house Kamal Barman to house of Bikash Barman at Sakair |
200000 |
Construction of CC road from the house Kamal Barman to house of Bikash Barman at Sakair 1 |
Completion of work |
-
latitude : 25.26492848,25.26492856
Longitude : 88.62994583,88.62994584
file name : Image_01092021092449043.png
|
2021-09-01 09:24:49.157395 |
180 |
57904982 |
Construction of CC Road from the house of Sundarpur Swapan Bhakta House Towards High Road Jidhra |
275000 |
Construction of CC Road from the house of Sundarpur Swapan Bhakta House Towards High Road Jidhra1 |
Completion of work |
-
latitude : 25.2650286,25.26502595
Longitude : 88.58077716,88.58077912
file name : Image_22022023110930862.png
|
2023-02-22 11:09:30.952902 |
181 |
57892314 |
Contruction of Soak pit front of Karanjabari Yukub Sarkar house at Majhikhanda |
5000 |
Contruction of Soak pit front of Karanjabari Yukub Sarkar house at Majhikhanda1 |
Completion of work |
-
latitude : 25.31319721
Longitude : 88.60232066
file name : Image_14032023135641471.png
|
2023-03-14 13:56:41.569184 |
182 |
57893064 |
Contruction of Soak pit front of Bablu Molla house at Jaminischinta |
5000 |
Contruction of Soak pit front of Bablu Molla house at Jaminischinta1 |
Completion of work |
-
latitude : 25.29840878
Longitude : 88.63457269
file name : Image_14032023135743908.png
|
2023-03-14 13:57:44.009716 |
183 |
57893064 |
Contruction of Soak pit front of Bablu Molla house at Jaminischinta |
5000 |
Contruction of Soak pit front of Bablu Molla house at Jaminischinta1 |
Completion of work |
-
latitude : 25.29840878
Longitude : 88.63457269
file name : Image_14032023135818137.png
|
2023-03-14 13:58:18.225461 |
184 |
66671901 |
CONS OF CC ROAD FROM THE HO S BARMAN TOWARDS THE VATPARA F P SCHOOL |
300000 |
CONS OF CC ROAD FROM THE HO S BARMAN TOWARDS THE VATPARA F P SCHOOL1 |
Roof laid |
-
latitude : 25.28649756,25.28649756
Longitude : 88.60698828,88.60698828
file name : Image_23032023103850800.png
|
2023-03-23 10:38:50.902084 |
185 |
66671901 |
CONS OF CC ROAD FROM THE HO S BARMAN TOWARDS THE VATPARA F P SCHOOL |
300000 |
CONS OF CC ROAD FROM THE HO S BARMAN TOWARDS THE VATPARA F P SCHOOL1 |
Plinth level |
-
latitude : 25.28658903,25.28658903
Longitude : 88.60681686,88.60681686
file name : Image_20032023134246389.png
|
2023-03-20 13:42:46.484561 |
186 |
66671901 |
CONS OF CC ROAD FROM THE HO S BARMAN TOWARDS THE VATPARA F P SCHOOL |
300000 |
CONS OF CC ROAD FROM THE HO S BARMAN TOWARDS THE VATPARA F P SCHOOL1 |
Completion of work |
-
latitude : 25.28662719,25.28662719
Longitude : 88.60679704,88.60679704
file name : Image_02032023151053679.png
|
2023-03-02 15:10:53.79601 |
187 |
46838306 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house Nabanu at Majhikhanda S |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house Nabanu at Majhikhanda S1 |
Roof laid |
-
latitude : 25.30643579,25.30643579
Longitude : 88.60993609,88.60993609
file name : Image_23032023103907940.png
|
2023-03-23 10:39:08.036142 |
188 |
46838306 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house Nabanu at Majhikhanda S |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house Nabanu at Majhikhanda S1 |
Plinth level |
-
latitude : 25.3064252,25.30642523
Longitude : 88.60988277,88.60988277
file name : Image_02032023151117244.png
|
2023-03-02 15:11:17.325153 |
189 |
46838306 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house Nabanu at Majhikhanda S |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house Nabanu at Majhikhanda S1 |
Completion of work |
-
latitude : 25.30650128,25.30650128
Longitude : 88.60984914,88.60984914
file name : Image_21032022111516345.png
|
2022-03-21 11:15:16.493601 |
190 |
46839149 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Mosjid at Chandahati at Durgapur |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Mosjid at Chandahati at Durgapur 1 |
Roof laid |
-
latitude : 25.308994,25.308994
Longitude : 88.6129395,88.6129395
file name : Image_23032023103901022.png
|
2023-03-23 10:39:01.131386 |
191 |
46839149 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Mosjid at Chandahati at Durgapur |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Mosjid at Chandahati at Durgapur 1 |
Plinth level |
-
latitude : 25.30867148,25.30867461
Longitude : 88.6129882,88.61299586
file name : Image_20032023134221506.png
|
2023-03-20 13:42:21.614832 |
192 |
46839149 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Mosjid at Chandahati at Durgapur |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Mosjid at Chandahati at Durgapur 1 |
Completion of work |
-
latitude : 25.30868194,25.30868192
Longitude : 88.61300077,88.61300077
file name : Image_02032023151140343.png
|
2023-03-02 15:11:40.447907 |
193 |
46839149 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Mosjid at Chandahati at Durgapur |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Mosjid at Chandahati at Durgapur 1 |
Completion of work |
-
latitude : 25.30799413,25.30799413
Longitude : 88.61304708,88.61304708
file name : Image_23032022103825175.png
|
2022-03-23 10:38:25.300048 |
194 |
66671701 |
CONS OF CC ROAD FROM THE HOUSE OF S UDDIN TOWARDS THE HOUSE MOSTAFA SARKAR |
300000 |
CONS OF CC ROAD FROM THE HOUSE OF S UDDIN TOWARDS THE HOUSE MOSTAFA SARKAR1 |
Roof laid |
-
latitude : 25.31556637,25.31556637
Longitude : 88.61394933,88.61394933
file name : Image_01042023121714864.png
|
2023-04-01 12:17:14.952295 |
195 |
66671701 |
CONS OF CC ROAD FROM THE HOUSE OF S UDDIN TOWARDS THE HOUSE MOSTAFA SARKAR |
300000 |
CONS OF CC ROAD FROM THE HOUSE OF S UDDIN TOWARDS THE HOUSE MOSTAFA SARKAR1 |
Plinth level |
-
latitude : 25.31718606,25.31718606
Longitude : 88.61225798,88.61225798
file name : Image_23032023103857387.png
|
2023-03-23 10:38:57.482165 |
196 |
66671701 |
CONS OF CC ROAD FROM THE HOUSE OF S UDDIN TOWARDS THE HOUSE MOSTAFA SARKAR |
300000 |
CONS OF CC ROAD FROM THE HOUSE OF S UDDIN TOWARDS THE HOUSE MOSTAFA SARKAR1 |
Completion of work |
-
latitude : 25.31562036,25.31562045
Longitude : 88.61396522,88.61396522
file name : Image_20032023134229668.png
|
2023-03-20 13:42:29.764422 |
197 |
57902701 |
Construction of CC Road From the house of Sobha haro House Towards Anil Kujur at Mahadebpur |
275000 |
Construction of CC Road From the house of Sobha haro House Towards Anil Kujur at Mahadebpur1 |
Roof laid |
-
latitude : 25.25712462,25.25712462
Longitude : 88.62092424,88.62092424
file name : Image_23032023103832538.png
|
2023-03-23 10:38:32.639402 |
198 |
57902701 |
Construction of CC Road From the house of Sobha haro House Towards Anil Kujur at Mahadebpur |
275000 |
Construction of CC Road From the house of Sobha haro House Towards Anil Kujur at Mahadebpur1 |
Plinth level |
-
latitude : 25.25715519,25.25715519
Longitude : 88.62086301,88.62086301
file name : Image_16032023143623821.png
|
2023-03-16 14:36:23.922845 |
199 |
57902701 |
Construction of CC Road From the house of Sobha haro House Towards Anil Kujur at Mahadebpur |
275000 |
Construction of CC Road From the house of Sobha haro House Towards Anil Kujur at Mahadebpur1 |
Completion of work |
-
latitude : 25.25714515,25.25714514
Longitude : 88.62083081,88.62083077
file name : Image_22022023110913741.png
|
2023-02-22 11:09:13.828379 |
200 |
57879441 |
Mark II Tubewell Labours Payment |
500000 |
Mark II Tubewell Labours Payment5 |
Completion of work |
-
latitude : 25.2939227
Longitude : 88.63043302
file name : Image_24032023092626227.png
|
2023-03-24 09:26:26.323879 |
201 |
57879441 |
Mark II Tubewell Labours Payment |
500000 |
Mark II Tubewell Labours Payment5 |
Completion of work |
-
latitude : 25.29493298
Longitude : 88.62962418
file name : Image_24032023092629905.png
|
2023-03-24 09:26:30.004426 |
202 |
57879441 |
Mark II Tubewell Labours Payment |
500000 |
Mark II Tubewell Labours Payment5 |
Completion of work |
-
latitude : 25.2963455
Longitude : 88.6315713
file name : Image_24032023093337850.png
|
2023-03-24 09:33:37.963651 |
203 |
57904181 |
Construction of CC Road From the House of Soleman Miya House Towards Sarot Barman House sarifabad |
275000 |
Construction of CC Road From the House of Soleman Miya House Towards Sarot Barman House sarifabad1 |
Roof laid |
-
latitude : 25.27486074,25.27486074
Longitude : 88.58604253,88.58604253
file name : Image_01042023121721669.png
|
2023-04-01 12:17:21.760354 |
204 |
57904181 |
Construction of CC Road From the House of Soleman Miya House Towards Sarot Barman House sarifabad |
275000 |
Construction of CC Road From the House of Soleman Miya House Towards Sarot Barman House sarifabad1 |
Plinth level |
-
latitude : 25.27482833,25.27482833
Longitude : 88.58603075,88.58603075
file name : Image_23032023103844226.png
|
2023-03-23 10:38:44.317581 |
205 |
57904181 |
Construction of CC Road From the House of Soleman Miya House Towards Sarot Barman House sarifabad |
275000 |
Construction of CC Road From the House of Soleman Miya House Towards Sarot Barman House sarifabad1 |
Completion of work |
-
latitude : 25.27476489,25.27476473
Longitude : 88.58586123,88.58586728
file name : Image_22022023110934786.png
|
2023-02-22 11:09:34.878103 |
206 |
57893834 |
Contruction of Soak pit front of Shibrampur Shib Mandir at Skair |
5000 |
Contruction of Soak pit front of Shibrampur Shib Mandir at Skair1 |
Plinth level |
-
latitude : 25.25496565
Longitude : 88.60996191
file name : Image_25032023095351194.png
|
2023-03-25 09:53:51.296136 |
207 |
57893834 |
Contruction of Soak pit front of Shibrampur Shib Mandir at Skair |
5000 |
Contruction of Soak pit front of Shibrampur Shib Mandir at Skair1 |
Completion of work |
-
latitude : 25.25492595
Longitude : 88.60993742
file name : Image_22022023110918858.png
|
2023-02-22 11:09:18.957461 |
208 |
57896592 |
Contruction of Soak pit front of Nimai Mahato house at Kistapur |
5000 |
Contruction of Soak pit front of Nimai Mahato house at Kistapur1 |
Roof laid |
-
latitude : 25.27631581
Longitude : 88.60437196
file name : Image_27072023132257282.png
|
2023-07-27 13:22:57.382573 |
209 |
57896592 |
Contruction of Soak pit front of Nimai Mahato house at Kistapur |
5000 |
Contruction of Soak pit front of Nimai Mahato house at Kistapur1 |
Completion of work |
-
latitude : 25.27631186
Longitude : 88.6043962
file name : Image_20032023134259340.png
|
2023-03-20 13:42:59.430816 |
210 |
57896592 |
Contruction of Soak pit front of Nimai Mahato house at Kistapur |
5000 |
Contruction of Soak pit front of Nimai Mahato house at Kistapur1 |
Completion of work |
-
latitude : 25.27254267
Longitude : 88.60224505
file name : Image_22022023110950294.png
|
2023-02-22 11:09:50.399582 |
211 |
57897646 |
Construction of Soak pit Front of Khorgeswar Land at Sakair |
5000 |
Construction of Soak pit Front of Khorgeswar Land at Sakair1 |
Roof laid |
-
latitude : 25.2963717
Longitude : 88.63159043
file name : Image_01082023164800672.png
|
2023-08-01 16:48:00.777131 |
212 |
57897646 |
Construction of Soak pit Front of Khorgeswar Land at Sakair |
5000 |
Construction of Soak pit Front of Khorgeswar Land at Sakair1 |
Plinth level |
-
latitude : 25.26842743
Longitude : 88.62686605
file name : Image_25032023095316307.png
|
2023-03-25 09:53:16.410251 |
213 |
57897646 |
Construction of Soak pit Front of Khorgeswar Land at Sakair |
5000 |
Construction of Soak pit Front of Khorgeswar Land at Sakair1 |
Completion of work |
-
latitude : 25.268491
Longitude : 88.62687651
file name : Image_16032023143718144.png
|
2023-03-16 14:37:18.239558 |
214 |
57898980 |
Construction of Soak pit Front of Itgah at Bhaginagar |
5000 |
Construction of Soak pit Front of Itgah at Bhaginagar1 |
Plinth level |
-
latitude : 25.27629172
Longitude : 88.62889445
file name : Image_23032023103828999.png
|
2023-03-23 10:38:29.110341 |
215 |
57898980 |
Construction of Soak pit Front of Itgah at Bhaginagar |
5000 |
Construction of Soak pit Front of Itgah at Bhaginagar1 |
Completion of work |
-
latitude : 25.27649267
Longitude : 88.62041386
file name : Image_22022023110859759.png
|
2023-02-22 11:08:59.847907 |
216 |
57898980 |
Construction of Soak pit Front of Itgah at Bhaginagar |
5000 |
Construction of Soak pit Front of Itgah at Bhaginagar1 |
Completion of work |
-
latitude : 25.27640716
Longitude : 88.62891196
file name : Image_16032023143809973.png
|
2023-03-16 14:38:10.077106 |
217 |
57898547 |
Construction of Soak pit Front of Haran Shil at Bhaginagar |
5000 |
Construction of Soak pit Front of Haran Shil at Bhaginagar1 |
Completion of work |
-
latitude : 25.2771185
Longitude : 88.62387958
file name : Image_22022023110904801.png
|
2023-02-22 11:09:04.889214 |
218 |
46834187 |
Construction of Cement Concrete /Bricks Drain from the house of Ismail e towords the house of Ki |
350000 |
Construction of Cement Concrete /Bricks Drain from the house of Ismail e towords the house of Ki1 |
Roof laid |
-
latitude : 25.26382636,25.26382765
Longitude : 88.60048815,88.60049234
file name : Image_31052023093900106.png
|
2023-05-31 09:39:00.202002 |
219 |
46834187 |
Construction of Cement Concrete /Bricks Drain from the house of Ismail e towords the house of Ki |
350000 |
Construction of Cement Concrete /Bricks Drain from the house of Ismail e towords the house of Ki1 |
Plinth level |
-
latitude : 25.26377514,25.26377239
Longitude : 88.60070302,88.60071239
file name : Image_23032023103836420.png
|
2023-03-23 10:38:36.513504 |
220 |
46834187 |
Construction of Cement Concrete /Bricks Drain from the house of Ismail e towords the house of Ki |
350000 |
Construction of Cement Concrete /Bricks Drain from the house of Ismail e towords the house of Ki1 |
Completion of work |
-
latitude : 25.26390646,25.26390582
Longitude : 88.60038171,88.60038231
file name : Image_22022023110926423.png
|
2023-02-22 11:09:26.510525 |
221 |
46840344 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Faruk Hossain at Nod |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Faruk Hossain at Nod1 |
Roof laid |
-
latitude : 25.28816944,25.28816944
Longitude : 88.60635279,88.60635279
file name : Image_13042023091417085.png
|
2023-04-13 09:14:17.172126 |
222 |
46840344 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Faruk Hossain at Nod |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Faruk Hossain at Nod1 |
Completion of work |
-
latitude : 25.28814424,25.28814358
Longitude : 88.60652878,88.60652784
file name : Image_02032023151059226.png
|
2023-03-02 15:10:59.328679 |
223 |
57868167 |
Installation of Solar Marsible Pump with reserver in Front of Sakair Naren Barman pachhimpara at Sak |
300000 |
Installation of Solar Marsible Pump with reserver in Front of Sakair Naren Barman pachhimpara at Sak1 |
Completion of work |
-
latitude : 25.26747772
Longitude : 88.62940069
file name : Image_09062023102744965.png
|
2023-06-09 10:27:45.05251 |
224 |
57868167 |
Installation of Solar Marsible Pump with reserver in Front of Sakair Naren Barman pachhimpara at Sak |
300000 |
Installation of Solar Marsible Pump with reserver in Front of Sakair Naren Barman pachhimpara at Sak1 |
Completion of work |
-
latitude : 25.26747992
Longitude : 88.62940966
file name : Image_06062023131816884.png
|
2023-06-06 13:18:17.005124 |
225 |
57874237 |
Installation Of Solar Sub Marsible Pump With Reserver in Front of Near Bapi Mandal Ganjakuri Nodhan |
300000 |
Installation Of Solar Sub Marsible Pump With Reserver in Front of Near Bapi Mandal Ganjakuri Nodhan1 |
Completion of work |
-
latitude : 25.28904883
Longitude : 88.61354601
file name : Image_09062023102733915.png
|
2023-06-09 10:27:34.006985 |
226 |
57874237 |
Installation Of Solar Sub Marsible Pump With Reserver in Front of Near Bapi Mandal Ganjakuri Nodhan |
300000 |
Installation Of Solar Sub Marsible Pump With Reserver in Front of Near Bapi Mandal Ganjakuri Nodhan1 |
Completion of work |
-
latitude : 25.28914772
Longitude : 88.61356644
file name : Image_06062023131737928.png
|
2023-06-06 13:17:38.040235 |
227 |
57863340 |
Pucca Drain With Cover From AliMuddin House To Nayapukur at Nodhan |
250000 |
Pucca Drain With Cover From AliMuddin House To Nayapukur at Nodhan1 |
Completion of work |
-
latitude : 25.28922397,25.28919597
Longitude : 88.60741562,88.60737993
file name : Image_09062023102739970.png
|
2023-06-09 10:27:40.063988 |
228 |
57863340 |
Pucca Drain With Cover From AliMuddin House To Nayapukur at Nodhan |
250000 |
Pucca Drain With Cover From AliMuddin House To Nayapukur at Nodhan1 |
Completion of work |
-
latitude : 25.28931461,25.28929434
Longitude : 88.60731762,88.60733088
file name : Image_06062023131746716.png
|
2023-06-06 13:17:46.832612 |
229 |
57862358 |
Pucca Drain With Cover From Faruk Miya Towards Akru Barman House at Jajiar sansad |
300000 |
Pucca Drain With Cover From Faruk Miya Towards Akru Barman House at Jajiar sansad1 |
Completion of work |
-
latitude : 25.30082576,25.30082487
Longitude : 88.63579156,88.6357938
file name : Image_21062023103428764.png
|
2023-06-21 10:34:28.865877 |
230 |
57862358 |
Pucca Drain With Cover From Faruk Miya Towards Akru Barman House at Jajiar sansad |
300000 |
Pucca Drain With Cover From Faruk Miya Towards Akru Barman House at Jajiar sansad1 |
Completion of work |
-
latitude : 25.30080061,25.30079453
Longitude : 88.63583845,88.63581912
file name : Image_09062023102727471.png
|
2023-06-09 10:27:27.564501 |
231 |
57862358 |
Pucca Drain With Cover From Faruk Miya Towards Akru Barman House at Jajiar sansad |
300000 |
Pucca Drain With Cover From Faruk Miya Towards Akru Barman House at Jajiar sansad1 |
Completion of work |
-
latitude : 25.3007895,25.30081543
Longitude : 88.63578807,88.63579743
file name : Image_06062023131721316.png
|
2023-06-06 13:17:21.424517 |
232 |
57866412 |
Installation Of Solar sub Marsible Pump With Reserver in Front Enayetpur Rofikul Molla House at Jidh |
300000 |
Installation Of Solar sub Marsible Pump With Reserver in Front Enayetpur Rofikul Molla House at Jidh1 |
Roof laid |
-
latitude : 25.25541709
Longitude : 88.5936494
file name : Image_27072023093050846.png
|
2023-07-27 09:30:50.950458 |
233 |
57866412 |
Installation Of Solar sub Marsible Pump With Reserver in Front Enayetpur Rofikul Molla House at Jidh |
300000 |
Installation Of Solar sub Marsible Pump With Reserver in Front Enayetpur Rofikul Molla House at Jidh1 |
Plinth level |
-
latitude : 25.25541019
Longitude : 88.59362376
file name : Image_02042023111319685.png
|
2023-04-02 11:13:19.765878 |
234 |
57866412 |
Installation Of Solar sub Marsible Pump With Reserver in Front Enayetpur Rofikul Molla House at Jidh |
300000 |
Installation Of Solar sub Marsible Pump With Reserver in Front Enayetpur Rofikul Molla House at Jidh1 |
Completion of work |
-
latitude : 25.25551679
Longitude : 88.59354234
file name : Image_26032023151943168.png
|
2023-03-26 15:19:43.266584 |
235 |
57869644 |
Installation of Solar Maesible Pump with reserver in Front of Kartik Shil Near ICDS Centre Chakprabh |
300000 |
Installation of Solar Maesible Pump with reserver in Front of Kartik Shil Near ICDS Centre Chakprabh1 |
Roof laid |
-
latitude : 25.27654082
Longitude : 88.62123321
file name : Image_04052023152151468.png
|
2023-05-04 15:21:51.566766 |
236 |
57869644 |
Installation of Solar Maesible Pump with reserver in Front of Kartik Shil Near ICDS Centre Chakprabh |
300000 |
Installation of Solar Maesible Pump with reserver in Front of Kartik Shil Near ICDS Centre Chakprabh1 |
Plinth level |
-
latitude : 25.27659354
Longitude : 88.62121126
file name : Image_26032023151946827.png
|
2023-03-26 15:19:46.944268 |
237 |
57869644 |
Installation of Solar Maesible Pump with reserver in Front of Kartik Shil Near ICDS Centre Chakprabh |
300000 |
Installation of Solar Maesible Pump with reserver in Front of Kartik Shil Near ICDS Centre Chakprabh1 |
Completion of work |
-
latitude : 25.27653976
Longitude : 88.62151056
file name : Image_14032023135734205.png
|
2023-03-14 13:57:34.306535 |
238 |
57869644 |
Installation of Solar Maesible Pump with reserver in Front of Kartik Shil Near ICDS Centre Chakprabh |
300000 |
Installation of Solar Maesible Pump with reserver in Front of Kartik Shil Near ICDS Centre Chakprabh1 |
Completion of work |
-
latitude : 25.27653976
Longitude : 88.62151056
file name : Image_14032023135813475.png
|
2023-03-14 13:58:13.556789 |
239 |
57850878 |
Pucca Drain with Cover From Ranjit Tappo House Towards Kaddu Oraw Pond at Jidhra |
300000 |
Pucca Drain with Cover From Ranjit Tappo House Towards Kaddu Oraw Pond at Jidhra1 |
Completion of work |
-
latitude : 25.25736652,25.25736596
Longitude : 88.59733344,88.59734762
file name : Image_27072023093059017.png
|
2023-07-27 09:30:59.110448 |
240 |
57850878 |
Pucca Drain with Cover From Ranjit Tappo House Towards Kaddu Oraw Pond at Jidhra |
300000 |
Pucca Drain with Cover From Ranjit Tappo House Towards Kaddu Oraw Pond at Jidhra1 |
Completion of work |
-
latitude : 25.25769105,25.25769338
Longitude : 88.59650258,88.59653042
file name : Image_06062023131801989.png
|
2023-06-06 13:18:02.099929 |
241 |
57885542 |
Construction Of Soak Pit Front of Jahiruddin House at Dwipkhanda |
5000 |
Construction Of Soak Pit Front of Jahiruddin House at Dwipkhanda1 |
Completion of work |
-
latitude : 25.3006987
Longitude : 88.5961012
file name : Image_14032023135800130.png
|
2023-03-14 13:58:00.23178 |
242 |
57886264 |
Construction Of Soak pit Front of Sundarpur Shibtala More at Jidhra |
5000 |
Construction Of Soak pit Front of Sundarpur Shibtala More at Jidhra1 |
Completion of work |
-
latitude : 25.26250751
Longitude : 88.58673739
file name : Image_26032023151938115.png
|
2023-03-26 15:19:38.214563 |
243 |
57886264 |
Construction Of Soak pit Front of Sundarpur Shibtala More at Jidhra |
5000 |
Construction Of Soak pit Front of Sundarpur Shibtala More at Jidhra1 |
Completion of work |
-
latitude : 25.26251333
Longitude : 88.58683516
file name : Image_14032023135753141.png
|
2023-03-14 13:57:53.244481 |
244 |
57886264 |
Construction Of Soak pit Front of Sundarpur Shibtala More at Jidhra |
5000 |
Construction Of Soak pit Front of Sundarpur Shibtala More at Jidhra1 |
Completion of work |
-
latitude : 25.26251333
Longitude : 88.58683516
file name : Image_14032023135828718.png
|
2023-03-14 13:58:28.824111 |
245 |
57887696 |
Construction of Soak Pit Front of Puthai FP school at Jajiar |
5000 |
Construction of Soak Pit Front of Puthai FP school at Jajiar1 |
Completion of work |
-
latitude : 25.29860565
Longitude : 88.6330706
file name : Image_25072023124838460.png
|
2023-07-25 12:48:38.569447 |
246 |
57888443 |
Construction of Soak Pit Near Asaraful House at Majikhanda |
5000 |
Construction of Soak Pit Near Asaraful House at Majikhanda1 |
Completion of work |
-
latitude : 25.30746054
Longitude : 88.60926793
file name : Image_14032023135723849.png
|
2023-03-14 13:57:23.969127 |
247 |
57888443 |
Construction of Soak Pit Near Asaraful House at Majikhanda |
5000 |
Construction of Soak Pit Near Asaraful House at Majikhanda1 |
Completion of work |
-
latitude : 25.30746054
Longitude : 88.60926793
file name : Image_14032023135805581.png
|
2023-03-14 13:58:05.681624 |
248 |
57891483 |
Constrution of Soak pit front of Dipak Mahanta at Darpail |
5000 |
Constrution of Soak pit front of Dipak Mahanta at Darpail1 |
Completion of work |
-
latitude : 25.29832288
Longitude : 88.63863265
file name : Image_14032023135748892.png
|
2023-03-14 13:57:49.021788 |
249 |
57891483 |
Constrution of Soak pit front of Dipak Mahanta at Darpail |
5000 |
Constrution of Soak pit front of Dipak Mahanta at Darpail1 |
Completion of work |
-
latitude : 25.29832288
Longitude : 88.63863265
file name : Image_14032023135823750.png
|
2023-03-14 13:58:23.845572 |
250 |
57894458 |
Contruction of Soak pit front of Faruk house at Nodhan |
5000 |
Contruction of Soak pit front of Faruk house at Nodhan1 |
Plinth level |
-
latitude : 25.3008996
Longitude : 88.5960901
file name : Image_27072023132307560.png
|
2023-07-27 13:23:07.681892 |
251 |
57894458 |
Contruction of Soak pit front of Faruk house at Nodhan |
5000 |
Contruction of Soak pit front of Faruk house at Nodhan1 |
Completion of work |
-
latitude : 25.28922852
Longitude : 88.60733792
file name : Image_02032023151104738.png
|
2023-03-02 15:11:04.859833 |
252 |
57895876 |
Contruction of Soak pit front of Laxmitala at Kistaputr |
5000 |
Contruction of Soak pit front of Laxmitala at Kistaputr1 |
Completion of work |
-
latitude : 25.27611966
Longitude : 88.60402881
file name : Image_27072023132253481.png
|
2023-07-27 13:22:53.582677 |
253 |
57897157 |
Construction of Soak Pit Front Of Kandna Hemram house at Sarifabad |
5000 |
Construction of Soak Pit Front Of Kandna Hemram house at Sarifabad1 |
Completion of work |
-
latitude : 25.27433171
Longitude : 88.59303746
file name : Image_27072023132300880.png
|
2023-07-27 13:23:00.979487 |
254 |
57897157 |
Construction of Soak Pit Front Of Kandna Hemram house at Sarifabad |
5000 |
Construction of Soak Pit Front Of Kandna Hemram house at Sarifabad1 |
Completion of work |
-
latitude : 25.27425766
Longitude : 88.59305078
file name : Image_01042023121718393.png
|
2023-04-01 12:17:18.488344 |
255 |
57898082 |
Construction of Soak pit Front of Swapna Ekka at Dwipkhanda |
5000 |
Construction of Soak pit Front of Swapna Ekka at Dwipkhanda1 |
Completion of work |
-
latitude : 25.29743158
Longitude : 88.59440697
file name : Image_27072023132304218.png
|
2023-07-27 13:23:04.32187 |
256 |
75704178 |
Construction of Cement Concrete Road. |
300000 |
Construction of Cement Concrete Road.1 |
Plinth level |
-
latitude : 25.28328805,25.28328805
Longitude : 88.61961095,88.61961099
file name : Image_09112023131029880.png
|
2023-11-09 13:10:30.315816 |
257 |
75704178 |
Construction of Cement Concrete Road. |
300000 |
Construction of Cement Concrete Road.1 |
Completion of work |
-
latitude : 25.28335335,25.28335123
Longitude : 88.61951523,88.61951743
file name : Image_20092023151047150.png
|
2023-09-20 15:10:47.26873 |
258 |
75705029 |
Construction of Cement Concrete Road |
250000 |
Construction of Cement Concrete Road1 |
Roof laid |
-
latitude : 25.2971171,25.2971171
Longitude : 88.6315594,88.6315594
file name : Image_09112023131041024.png
|
2023-11-09 13:10:41.387109 |
259 |
75705029 |
Construction of Cement Concrete Road |
250000 |
Construction of Cement Concrete Road1 |
Plinth level |
-
latitude : 25.2971286,25.2971286
Longitude : 88.6315505,88.6315505
file name : Image_27092023145059676.png
|
2023-09-27 14:50:59.764561 |
260 |
75705029 |
Construction of Cement Concrete Road |
250000 |
Construction of Cement Concrete Road1 |
Completion of work |
-
latitude : 25.2975421,25.2975421
Longitude : 88.631472,88.631472
file name : Image_21092023132758244.png
|
2023-09-21 13:27:58.343528 |
261 |
57883300 |
Construction of Comunity Toilet in Front TMC Office Daralhat at Public Place |
600000 |
Construction of Comunity Toilet in Front TMC Office Daralhat at Public Place1 |
Roof laid |
-
latitude : 25.2994464
Longitude : 88.6325136
file name : Image_03022024140133254.png
|
2024-02-03 14:01:33.319745 |
262 |
57883300 |
Construction of Comunity Toilet in Front TMC Office Daralhat at Public Place |
600000 |
Construction of Comunity Toilet in Front TMC Office Daralhat at Public Place1 |
Roof laid |
-
latitude : 25.2994276
Longitude : 88.632547
file name : Image_03022024140127568.png
|
2024-02-03 14:01:27.639932 |
263 |
57883300 |
Construction of Comunity Toilet in Front TMC Office Daralhat at Public Place |
600000 |
Construction of Comunity Toilet in Front TMC Office Daralhat at Public Place1 |
Plinth level |
-
latitude : 25.2994136
Longitude : 88.6326042
file name : Image_07102023104902389.png
|
2023-10-07 10:49:02.474417 |
264 |
57883300 |
Construction of Comunity Toilet in Front TMC Office Daralhat at Public Place |
600000 |
Construction of Comunity Toilet in Front TMC Office Daralhat at Public Place1 |
Completion of work |
-
latitude : 25.29936
Longitude : 88.6320048
file name : Image_20092023121903259.png
|
2023-09-20 12:19:03.375795 |
265 |
78780942 |
rOAD CC |
85000 |
rOAD CC1 |
Completion of work |
-
latitude : 25.28655765,25.28655765
Longitude : 88.60760242,88.60760242
file name : Image_27092023144816274.png
|
2023-09-27 14:48:16.370867 |
266 |
78777801 |
construction of Cement Road from House of Safiuddin towards Amkuri Nodhan |
300000 |
construction of Cement Road from House of Safiuddin towards Amkuri Nodhan1 |
Plinth level |
-
latitude : 25.29007833,25.29009421
Longitude : 88.60554181,88.6054939
file name : Image_13102023173430621.png
|
2023-10-13 17:34:30.813815 |
267 |
78777801 |
construction of Cement Road from House of Safiuddin towards Amkuri Nodhan |
300000 |
construction of Cement Road from House of Safiuddin towards Amkuri Nodhan1 |
Plinth level |
-
latitude : 25.29015679,25.29015472
Longitude : 88.60560374,88.60560345
file name : Image_27092023144810149.png
|
2023-09-27 14:48:10.241018 |
268 |
78777801 |
construction of Cement Road from House of Safiuddin towards Amkuri Nodhan |
300000 |
construction of Cement Road from House of Safiuddin towards Amkuri Nodhan1 |
Completion of work |
-
latitude : 25.29008818,25.29008718
Longitude : 88.60548867,88.60548894
file name : Image_21092023132204915.png
|
2023-09-21 13:22:05.008528 |
269 |
78782167 |
Roads |
230000 |
Roads1 |
Plinth level |
-
latitude : 25.29270381,25.29271248
Longitude : 88.59262642,88.5927506
file name : Image_20112023085504459.png
|
2023-11-20 08:55:04.55862 |
270 |
78782167 |
Roads |
230000 |
Roads1 |
Completion of work |
-
latitude : 25.29270595,25.29270318
Longitude : 88.59274557,88.59273789
file name : Image_01112023123626336.png
|
2023-11-01 12:36:26.42964 |
271 |
78782167 |
Roads |
230000 |
Roads1 |
Completion of work |
-
latitude : 25.29269871,25.29268826
Longitude : 88.59277267,88.59277375
file name : Image_13102023171724199.png
|
2023-10-13 17:17:24.301457 |
272 |
78774046 |
construction of ement concrete road |
280000 |
construction of ement concrete road1 |
Plinth level |
-
latitude : 25.30501144,25.3051029
Longitude : 88.60559775,88.6056459
file name : Image_13102023171716379.png
|
2023-10-13 17:17:16.487484 |
273 |
78774046 |
construction of ement concrete road |
280000 |
construction of ement concrete road1 |
Plinth level |
-
latitude : 25.3050969,25.3050984
Longitude : 88.6056329,88.6056343
file name : Image_27092023165857252.png
|
2023-09-27 16:58:57.346476 |
274 |
78774046 |
construction of ement concrete road |
280000 |
construction of ement concrete road1 |
Completion of work |
-
latitude : 25.305137,25.305137
Longitude : 88.6056275,88.6056275
file name : Image_21092023132156357.png
|
2023-09-21 13:21:56.449755 |
275 |
67888952 |
Creation of a new source of drinking water |
699300 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 25.29634085
Longitude : 88.63170411
file name : Image_29112023111337164.png
|
2023-11-29 11:13:37.256266 |
276 |
67888952 |
Creation of a new source of drinking water |
699300 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 25.2963492
Longitude : 88.63171441
file name : Image_29112023111006066.png
|
2023-11-29 11:10:06.164016 |
277 |
67888952 |
Creation of a new source of drinking water |
699300 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 25.29636115
Longitude : 88.63172653
file name : Image_29112023110809121.png
|
2023-11-29 11:08:09.218444 |
278 |
67888952 |
Creation of a new source of drinking water |
699300 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 25.2963973
Longitude : 88.6315855
file name : Image_29112023110006862.png
|
2023-11-29 11:00:06.955438 |
279 |
67888952 |
Creation of a new source of drinking water |
699300 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 25.2963639
Longitude : 88.6315925
file name : Image_29112023105656445.png
|
2023-11-29 10:56:56.557777 |
280 |
67599384 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.25747142
Longitude : 88.59684896
file name : Image_09032024142305632.png
|
2024-03-09 14:23:05.70174 |
281 |
67599384 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.25745073
Longitude : 88.59679951
file name : Image_09032024141728631.png
|
2024-03-09 14:17:28.703965 |
282 |
67599384 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.25751208
Longitude : 88.59683192
file name : Image_26112023114350986.png
|
2023-11-26 11:43:51.078525 |
283 |
67599384 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.25750475
Longitude : 88.59681149
file name : Image_20112023085514498.png
|
2023-11-20 08:55:14.58244 |
284 |
67599384 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.25753979
Longitude : 88.59676197
file name : Image_01112023123636705.png
|
2023-11-01 12:36:36.84476 |
285 |
67598542 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.2766046
Longitude : 88.62312582
file name : Image_09032024141633106.png
|
2024-03-09 14:16:33.194832 |
286 |
67598542 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.27649151
Longitude : 88.6230535
file name : Image_11122023165001372.png
|
2023-12-11 16:50:01.446696 |
287 |
67598542 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.27650761
Longitude : 88.62325606
file name : Image_20112023085524822.png
|
2023-11-20 08:55:24.904036 |
288 |
67598542 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.27656965
Longitude : 88.62316319
file name : Image_01112023123640042.png
|
2023-11-01 12:36:40.135861 |
289 |
67598425 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.28662102
Longitude : 88.60614549
file name : Image_11122023165005139.png
|
2023-12-11 16:50:05.233764 |
290 |
67598425 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.28661769
Longitude : 88.60612563
file name : Image_20112023085508992.png
|
2023-11-20 08:55:09.07999 |
291 |
67598425 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.28657125
Longitude : 88.60608913
file name : Image_01112023123629871.png
|
2023-11-01 12:36:30.00134 |
292 |
67598244 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.30119672
Longitude : 88.5973897
file name : Image_08032024132333742.png
|
2024-03-08 13:23:33.818843 |
293 |
67598244 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.2978906
Longitude : 88.59351656
file name : Image_11122023165008787.png
|
2023-12-11 16:50:08.870195 |
294 |
67598244 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.29791996
Longitude : 88.59353592
file name : Image_20112023085459181.png
|
2023-11-20 08:54:59.276163 |
295 |
67598244 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.29788698
Longitude : 88.59350692
file name : Image_01112023123623071.png
|
2023-11-01 12:36:23.213328 |
296 |
67598133 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.30118408
Longitude : 88.59744031
file name : Image_08032024132150562.png
|
2024-03-08 13:21:50.627681 |
297 |
67598133 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.29791257
Longitude : 88.59345032
file name : Image_08032024130049706.png
|
2024-03-08 13:00:49.779633 |
298 |
67598133 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.30114865
Longitude : 88.59744677
file name : Image_11122023165012472.png
|
2023-12-11 16:50:12.551888 |
299 |
67598133 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.30116553
Longitude : 88.59736698
file name : Image_20112023085454240.png
|
2023-11-20 08:54:54.332152 |
300 |
67598133 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.30115158
Longitude : 88.59741342
file name : Image_01112023123619617.png
|
2023-11-01 12:36:19.715386 |
301 |
67597933 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.29491374
Longitude : 88.63386473
file name : Image_08032024092506344.png
|
2024-03-08 09:25:06.413717 |
302 |
67597933 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.29635388
Longitude : 88.63157909
file name : Image_29112023120553940.png
|
2023-11-29 12:05:54.040143 |
303 |
67597933 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.29489782
Longitude : 88.63389793
file name : Image_27112023094512918.png
|
2023-11-27 09:45:13.0087 |
304 |
67597933 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.29492455
Longitude : 88.63392505
file name : Image_20112023085533777.png
|
2023-11-20 08:55:33.893235 |
305 |
67597933 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.29495006
Longitude : 88.63392704
file name : Image_09112023140132194.png
|
2023-11-09 14:01:32.315188 |
306 |
67596864 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.2949285,25.2949285
Longitude : 88.6303637,88.6303637
file name : Image_27122023123845365.png
|
2023-12-27 12:38:45.431774 |
307 |
67596864 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.2949403,25.2949403
Longitude : 88.630367,88.630367
file name : Image_21122023135721226.png
|
2023-12-21 13:57:21.293038 |
308 |
67596864 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.2949295,25.2949295
Longitude : 88.6303496,88.6303496
file name : Image_17122023094649184.png
|
2023-12-17 09:46:49.253503 |
309 |
67596671 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.31246348,25.31246808,25.31246808
Longitude : 88.59989542,88.5998984,88.5998984
file name : Image_26112023093033176.png
|
2023-11-26 09:30:33.269374 |
310 |
67585009 |
Construction of roads |
50000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.29811823,25.29811823
Longitude : 88.63197785,88.63197785
file name : Image_13092024112905391.png
|
2024-09-13 11:29:05.480072 |
311 |
67585009 |
Construction of roads |
50000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.30386562,25.3038656
Longitude : 88.63178236,88.63178234
file name : Image_22112023125033525.png
|
2023-11-22 12:50:33.612406 |
312 |
67583622 |
Construction of roads |
300000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.28415862,25.28415853
Longitude : 88.62149878,88.62149884
file name : Image_09032024093739308.png
|
2024-03-09 09:37:39.37425 |
313 |
67583622 |
Construction of roads |
300000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.28413436,25.28413436
Longitude : 88.62138934,88.62138934
file name : Image_27112023110305764.png
|
2023-11-27 11:03:05.854726 |
314 |
67583622 |
Construction of roads |
300000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.28419107,25.28419156
Longitude : 88.62158171,88.62157999
file name : Image_26112023093023761.png
|
2023-11-26 09:30:23.860513 |
315 |
67583622 |
Construction of roads |
300000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.28419528,25.28419528
Longitude : 88.6215239,88.6215239
file name : Image_22112023125020152.png
|
2023-11-22 12:50:20.23691 |
316 |
67583622 |
Construction of roads |
300000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.28416662,25.28416832
Longitude : 88.62155471,88.62155626
file name : Image_09112023131035574.png
|
2023-11-09 13:10:35.808945 |
317 |
67601239 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 25.27572695
Longitude : 88.62315708
file name : Image_21122023135717097.png
|
2023-12-21 13:57:17.159446 |
318 |
67601239 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 25.27570489
Longitude : 88.62313017
file name : Image_14122023133723032.png
|
2023-12-14 13:37:23.099921 |
319 |
67601239 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 25.27579696
Longitude : 88.62311099
file name : Image_22112023125056505.png
|
2023-11-22 12:50:56.587713 |
320 |
67583992 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.30100458,25.3010046
Longitude : 88.63054913,88.63054913
file name : Image_27112023110314930.png
|
2023-11-27 11:03:15.01924 |
321 |
67583992 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.30105976,25.30105976
Longitude : 88.63054542,88.63054542
file name : Image_22112023125024299.png
|
2023-11-22 12:50:24.385328 |
322 |
67583992 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.29727143,25.29727143
Longitude : 88.63124995,88.63124995
file name : Image_09112023132342852.png
|
2023-11-09 13:23:42.95832 |
323 |
67596783 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.2637316,25.263732
Longitude : 88.5871819,88.5871853
file name : Image_14122023133715116.png
|
2023-12-14 13:37:15.196273 |
324 |
67596783 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.2962095,25.2962095
Longitude : 88.63165568,88.63165568
file name : Image_14122023134823842.png
|
2023-12-14 13:48:23.913391 |
325 |
67596783 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.26306931,25.26306909
Longitude : 88.5868959,88.58689538
file name : Image_01122023141249830.png
|
2023-12-01 14:12:49.924256 |
326 |
67596783 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.26294459,25.26294514
Longitude : 88.58674489,88.58675206
file name : Image_21112023151602187.png
|
2023-11-21 15:16:02.271294 |
327 |
67598040 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.30629563
Longitude : 88.61425304
file name : Image_21122023094357388.png
|
2023-12-21 09:43:57.475978 |
328 |
67598040 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.30637722
Longitude : 88.61412187
file name : Image_20112023085446060.png
|
2023-11-20 08:54:46.153003 |
329 |
67598040 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.30640157
Longitude : 88.61405599
file name : Image_01112023123616418.png
|
2023-11-01 12:36:16.514013 |
330 |
67598695 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.2737694
Longitude : 88.62795501
file name : Image_11122023164957431.png
|
2023-12-11 16:49:57.505805 |
331 |
67598695 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.27378342
Longitude : 88.62799773
file name : Image_26112023114342485.png
|
2023-11-26 11:43:42.579302 |
332 |
67598695 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.27378392
Longitude : 88.62802269
file name : Image_20112023085529451.png
|
2023-11-20 08:55:29.550645 |
333 |
67598695 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.27386979
Longitude : 88.62793221
file name : Image_01112023123643419.png
|
2023-11-01 12:36:43.568728 |
334 |
67572050 |
Construction of roads |
300000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.2737523,25.2737523
Longitude : 88.6015926,88.6015926
file name : Image_17122023111401796.png
|
2023-12-17 11:14:01.862831 |
335 |
67572050 |
Construction of roads |
300000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.26393808,25.26393808
Longitude : 88.6004053,88.6004053
file name : Image_14122023133719299.png
|
2023-12-14 13:37:19.376878 |
336 |
67572050 |
Construction of roads |
300000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.2639326,25.26393252
Longitude : 88.60043438,88.60043472
file name : Image_21112023151611967.png
|
2023-11-21 15:16:12.074288 |
337 |
67571454 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.27668922,25.27668918
Longitude : 88.58752389,88.58752441
file name : Image_01122023141239404.png
|
2023-12-01 14:12:39.524162 |
338 |
67571454 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.27662757,25.27662797
Longitude : 88.58752199,88.5875221
file name : Image_27112023110310172.png
|
2023-11-27 11:03:10.259662 |
339 |
67571454 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.27692887,25.27692887
Longitude : 88.5874848,88.5874848
file name : Image_26112023093028792.png
|
2023-11-26 09:30:28.886855 |
340 |
67574555 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.28633624,25.28633624
Longitude : 88.60876183,88.60876183
file name : Image_24052024163137875.png
|
2024-05-24 16:31:37.95003 |
341 |
67574555 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.28632413,25.28632419
Longitude : 88.60867059,88.60867029
file name : Image_24052024162347929.png
|
2024-05-24 16:23:48.0052 |
342 |
67574555 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.286385,25.28638502
Longitude : 88.6086052,88.60860522
file name : Image_15032024152039586.png
|
2024-03-15 15:20:39.665603 |
343 |
67574555 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.28636015,25.28636003
Longitude : 88.6086741,88.60867401
file name : Image_15032024151732391.png
|
2024-03-15 15:17:32.496129 |
344 |
67595665 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.27584738,25.27597412
Longitude : 88.60393029,88.60381391
file name : Image_12052024121206645.png
|
2024-05-12 12:12:06.707056 |
345 |
67595665 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.27600264,25.27595401
Longitude : 88.60380982,88.60389767
file name : Image_14032024173514136.png
|
2024-03-14 17:35:14.211292 |
346 |
67595665 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.27584718,25.27583617
Longitude : 88.60392788,88.60393063
file name : Image_13032024150624462.png
|
2024-03-13 15:06:24.550547 |
347 |
67583811 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.30214148,25.30214148
Longitude : 88.63195784,88.63195784
file name : Image_05072024103821740.png
|
2024-07-05 10:38:21.823057 |
348 |
67583811 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.30220656,25.30220533
Longitude : 88.63195503,88.63195654
file name : Image_14062024142816066.png
|
2024-06-14 14:28:16.128575 |
349 |
67583811 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.30220424,25.30220629
Longitude : 88.63199024,88.63198957
file name : Image_15032024174416967.png
|
2024-03-15 17:44:17.03779 |
350 |
67596386 |
Construction of Sheds |
300000 |
Construction of Sheds1 |
Roof laid |
-
latitude : 25.27046367
Longitude : 88.61803233
file name : Image_12072024155746134.png
|
2024-07-12 15:57:46.058103 |
351 |
67596386 |
Construction of Sheds |
300000 |
Construction of Sheds1 |
Plinth level |
-
latitude : 25.27053423
Longitude : 88.61807933
file name : Image_12072024155316260.png
|
2024-07-12 15:53:16.323739 |
352 |
67596386 |
Construction of Sheds |
300000 |
Construction of Sheds1 |
Completion of work |
-
latitude : 25.29095617
Longitude : 88.62972257
file name : Image_29052024131505415.png
|
2024-05-29 13:15:05.514606 |
353 |
67596505 |
Construction of Sheds |
300000 |
Construction of Sheds1 |
Roof laid |
-
latitude : 25.30009747
Longitude : 88.60567328
file name : Image_03062024155503504.png
|
2024-06-03 15:55:03.578532 |
354 |
67596505 |
Construction of Sheds |
300000 |
Construction of Sheds1 |
Plinth level |
-
latitude : 25.30009718
Longitude : 88.60574692
file name : Image_12052024152433645.png
|
2024-05-12 15:24:33.706698 |
355 |
67596505 |
Construction of Sheds |
300000 |
Construction of Sheds1 |
Completion of work |
-
latitude : 25.30007741
Longitude : 88.6057465
file name : Image_13032024172744822.png
|
2024-03-13 17:27:44.901506 |
356 |
34899803 |
Bamboo Pilling at the bank of Godaharpukur from Fayjul Mandal to Moslem Sarka at Dwipkhanda |
100000 |
Bamboo Pilling at the bank of Godaharpukur from Fayjul Mandal to Moslem Sarka at Dwipkhanda 1 |
Roof laid |
-
latitude : 25.29190018,25.29190018
Longitude : 88.59323346,88.59323346
file name : Image_28012022123713533.png
|
2022-01-28 12:37:13.660001 |
357 |
34899803 |
Bamboo Pilling at the bank of Godaharpukur from Fayjul Mandal to Moslem Sarka at Dwipkhanda |
100000 |
Bamboo Pilling at the bank of Godaharpukur from Fayjul Mandal to Moslem Sarka at Dwipkhanda 1 |
Plinth level |
-
latitude : 25.29187249,25.29187028
Longitude : 88.59320912,88.59320386
file name : Image_28012022104243670.png
|
2022-01-28 10:42:43.777651 |
358 |
34899803 |
Bamboo Pilling at the bank of Godaharpukur from Fayjul Mandal to Moslem Sarka at Dwipkhanda |
100000 |
Bamboo Pilling at the bank of Godaharpukur from Fayjul Mandal to Moslem Sarka at Dwipkhanda 1 |
Completion of work |
-
latitude : 25.29187202,25.29186855
Longitude : 88.59323783,88.59322839
file name : Image_28062021124341748.png
|
2021-06-28 12:43:41.850236 |
359 |
34898197 |
Construction of CC road from the house Ratan Kisku to the Pucca Rasta at Dwipkhanda |
150000 |
Construction of CC road from the house Ratan Kisku to the Pucca Rasta at Dwipkhanda 1 |
Roof laid |
-
latitude : 25.29496157,25.294961
Longitude : 88.59446426,88.59446303
file name : Image_05042022094509054.png
|
2022-04-05 09:45:09.169932 |
360 |
34898197 |
Construction of CC road from the house Ratan Kisku to the Pucca Rasta at Dwipkhanda |
150000 |
Construction of CC road from the house Ratan Kisku to the Pucca Rasta at Dwipkhanda 1 |
Plinth level |
-
latitude : 25.29492478,25.29492478
Longitude : 88.59448732,88.59448732
file name : Image_29032022100524720.png
|
2022-03-29 10:05:24.82943 |
361 |
34898197 |
Construction of CC road from the house Ratan Kisku to the Pucca Rasta at Dwipkhanda |
150000 |
Construction of CC road from the house Ratan Kisku to the Pucca Rasta at Dwipkhanda 1 |
Completion of work |
-
latitude : 25.29498942,25.29498935
Longitude : 88.59453952,88.59453939
file name : Image_28062021124338817.png
|
2021-06-28 12:43:38.914792 |
362 |
34852911 |
Installation of Sub-Marsible in front of the house of Kishan Mahato |
150000 |
Installation of Sub-Marsible in front of the house of Kishan Mahato 1 |
Roof laid |
-
latitude : 25.27257745
Longitude : 88.6022391
file name : Image_28012022123717560.png
|
2022-01-28 12:37:17.7044 |
363 |
34852911 |
Installation of Sub-Marsible in front of the house of Kishan Mahato |
150000 |
Installation of Sub-Marsible in front of the house of Kishan Mahato 1 |
Completion of work |
-
latitude : 25.27246052
Longitude : 88.60218989
file name : Image_29112021111231222.png
|
2021-11-29 11:12:31.345241 |
364 |
34852911 |
Installation of Sub-Marsible in front of the house of Kishan Mahato |
150000 |
Installation of Sub-Marsible in front of the house of Kishan Mahato 1 |
Completion of work |
-
latitude : 25.27246052
Longitude : 88.60218989
file name : Image_29112021111344927.png
|
2021-11-29 11:13:45.038883 |
365 |
46540362 |
Construction of Cement Concrete Road from the house of Saleman Miah towords the house of Sharat Ba |
350000 |
Construction of Cement Concrete Road from the house of Saleman Miah towords the house of Sharat Ba1 |
Roof laid |
-
latitude : 25.27423282,25.27423282
Longitude : 88.58559688,88.58559688
file name : Image_03122022110759042.png
|
2022-12-03 11:07:59.126785 |
366 |
46540362 |
Construction of Cement Concrete Road from the house of Saleman Miah towords the house of Sharat Ba |
350000 |
Construction of Cement Concrete Road from the house of Saleman Miah towords the house of Sharat Ba1 |
Plinth level |
-
latitude : 25.27418356,25.27418392
Longitude : 88.58560976,88.58561159
file name : Image_24112022095952331.png
|
2022-11-24 09:59:52.431821 |
367 |
46540362 |
Construction of Cement Concrete Road from the house of Saleman Miah towords the house of Sharat Ba |
350000 |
Construction of Cement Concrete Road from the house of Saleman Miah towords the house of Sharat Ba1 |
Completion of work |
-
latitude : 25.27421668,25.27421667
Longitude : 88.58559694,88.58559694
file name : Image_19092022140429958.png
|
2022-09-19 14:04:30.040953 |
368 |
46541270 |
Construction of Cement Concrete Road from the house of Mamenur towords the Barapukur Para Road at |
200000 |
Construction of Cement Concrete Road from the house of Mamenur towords the Barapukur Para Road at1 |
Roof laid |
-
latitude : 25.30877656,25.30877656
Longitude : 88.61559075,88.61559075
file name : Image_04022023123315061.png
|
2023-02-04 12:33:15.157544 |
369 |
46541270 |
Construction of Cement Concrete Road from the house of Mamenur towords the Barapukur Para Road at |
200000 |
Construction of Cement Concrete Road from the house of Mamenur towords the Barapukur Para Road at1 |
Plinth level |
-
latitude : 25.30859923,25.30859923
Longitude : 88.61558654,88.61558654
file name : Image_03022023123950748.png
|
2023-02-03 12:39:50.867477 |
370 |
46541270 |
Construction of Cement Concrete Road from the house of Mamenur towords the Barapukur Para Road at |
200000 |
Construction of Cement Concrete Road from the house of Mamenur towords the Barapukur Para Road at1 |
Completion of work |
-
latitude : 25.3084931,25.3084931
Longitude : 88.6155847,88.6155847
file name : Image_03122022110806875.png
|
2022-12-03 11:08:06.971209 |
371 |
46539900 |
Construction of Cement Concrete Road from the house of Ratan Oraw towords the Pacca Rasta at Dwipkha |
350000 |
Construction of Cement Concrete Road from the house of Ratan Oraw towords the Pacca Rasta at Dwipkha1 |
Roof laid |
-
latitude : 25.29495074,25.29495074
Longitude : 88.59510557,88.59510557
file name : Image_02032023151108981.png
|
2023-03-02 15:11:09.103481 |
372 |
46539900 |
Construction of Cement Concrete Road from the house of Ratan Oraw towords the Pacca Rasta at Dwipkha |
350000 |
Construction of Cement Concrete Road from the house of Ratan Oraw towords the Pacca Rasta at Dwipkha1 |
Plinth level |
-
latitude : 25.29499718,25.29499718
Longitude : 88.59503568,88.5950357
file name : Image_04022023123309114.png
|
2023-02-04 12:33:09.233019 |
373 |
46539900 |
Construction of Cement Concrete Road from the house of Ratan Oraw towords the Pacca Rasta at Dwipkha |
350000 |
Construction of Cement Concrete Road from the house of Ratan Oraw towords the Pacca Rasta at Dwipkha1 |
Completion of work |
-
latitude : 25.29507564,25.29508215
Longitude : 88.59506236,88.59506631
file name : Image_03022023123945949.png
|
2023-02-03 12:39:46.059878 |
374 |
46542896 |
Construction of Cement Concrete Road from the house of Barun Mahata towords the house Yousuf Ali |
250000 |
Construction of Cement Concrete Road from the house of Barun Mahata towords the house Yousuf Ali1 |
Roof laid |
-
latitude : 25.27230607,25.27230604
Longitude : 88.60230788,88.60231441
file name : Image_23032023103847575.png
|
2023-03-23 10:38:47.676915 |
375 |
46542896 |
Construction of Cement Concrete Road from the house of Barun Mahata towords the house Yousuf Ali |
250000 |
Construction of Cement Concrete Road from the house of Barun Mahata towords the house Yousuf Ali1 |
Plinth level |
-
latitude : 25.27227806,25.27227802
Longitude : 88.60234876,88.60234876
file name : Image_20032023134252830.png
|
2023-03-20 13:42:52.920733 |
376 |
46542896 |
Construction of Cement Concrete Road from the house of Barun Mahata towords the house Yousuf Ali |
250000 |
Construction of Cement Concrete Road from the house of Barun Mahata towords the house Yousuf Ali1 |
Completion of work |
-
latitude : 25.27229322,25.27229322
Longitude : 88.60227289,88.60227289
file name : Image_22022023110940381.png
|
2023-02-22 11:09:40.483458 |
377 |
66671832 |
CONS OF CC ROAD FROM TRANSFORMER TOWARDS THE HOUSE OF S TIRKI AT MAJHIKHANDA |
300000 |
CONS OF CC ROAD FROM TRANSFORMER TOWARDS THE HOUSE OF S TIRKI AT MAJHIKHANDA1 |
Roof laid |
-
latitude : 25.30732818,25.30732844
Longitude : 88.60867965,88.60867877
file name : Image_23032023103854097.png
|
2023-03-23 10:38:54.188082 |
378 |
66671832 |
CONS OF CC ROAD FROM TRANSFORMER TOWARDS THE HOUSE OF S TIRKI AT MAJHIKHANDA |
300000 |
CONS OF CC ROAD FROM TRANSFORMER TOWARDS THE HOUSE OF S TIRKI AT MAJHIKHANDA1 |
Plinth level |
-
latitude : 25.30730067,25.30730067
Longitude : 88.60874008,88.60874008
file name : Image_20032023134240180.png
|
2023-03-20 13:42:40.277279 |
379 |
66671832 |
CONS OF CC ROAD FROM TRANSFORMER TOWARDS THE HOUSE OF S TIRKI AT MAJHIKHANDA |
300000 |
CONS OF CC ROAD FROM TRANSFORMER TOWARDS THE HOUSE OF S TIRKI AT MAJHIKHANDA1 |
Completion of work |
-
latitude : 25.30733,25.30733165
Longitude : 88.60873914,88.60873828
file name : Image_02032023151121789.png
|
2023-03-02 15:11:21.882062 |
380 |
66671636 |
CONS OF CC ROAD FROM THE HOUSE OF OF HIMANSU BARMAN TOWARDS THE NURSERY OF BHUJAN BARMAN |
348839 |
CONS OF CC ROAD FROM THE HOUSE OF OF HIMANSU BARMAN TOWARDS THE NURSERY OF BHUJAN BARMAN 1 |
Roof laid |
-
latitude : 25.26490661,25.26490723
Longitude : 88.63036262,88.63036306
file name : Image_16032023143536236.png
|
2023-03-16 14:35:36.335854 |
381 |
66671636 |
CONS OF CC ROAD FROM THE HOUSE OF OF HIMANSU BARMAN TOWARDS THE NURSERY OF BHUJAN BARMAN |
348839 |
CONS OF CC ROAD FROM THE HOUSE OF OF HIMANSU BARMAN TOWARDS THE NURSERY OF BHUJAN BARMAN 1 |
Plinth level |
-
latitude : 25.26495504,25.26495506
Longitude : 88.63033583,88.63033583
file name : Image_02032023151049025.png
|
2023-03-02 15:10:49.119406 |
382 |
66671636 |
CONS OF CC ROAD FROM THE HOUSE OF OF HIMANSU BARMAN TOWARDS THE NURSERY OF BHUJAN BARMAN |
348839 |
CONS OF CC ROAD FROM THE HOUSE OF OF HIMANSU BARMAN TOWARDS THE NURSERY OF BHUJAN BARMAN 1 |
Completion of work |
-
latitude : 25.26488715,25.26488727
Longitude : 88.6301891,88.63018922
file name : Image_22022023110909299.png
|
2023-02-22 11:09:09.411676 |
383 |
46543727 |
Construction of Slab- Culvert in front of the house of Ismail at Darpail Sansad. |
300000 |
Construction of Slab- Culvert in front of the house of Ismail at Darpail Sansad. 1 |
Roof laid |
-
latitude : 25.29803255,25.29802967
Longitude : 88.63762964,88.63762525
file name : Image_26032023151916899.png
|
2023-03-26 15:19:17.000484 |
384 |
46543727 |
Construction of Slab- Culvert in front of the house of Ismail at Darpail Sansad. |
300000 |
Construction of Slab- Culvert in front of the house of Ismail at Darpail Sansad. 1 |
Plinth level |
-
latitude : 25.29799483,25.29799483
Longitude : 88.63756807,88.63757021
file name : Image_16032023151338146.png
|
2023-03-16 15:13:38.2513 |
385 |
46543727 |
Construction of Slab- Culvert in front of the house of Ismail at Darpail Sansad. |
300000 |
Construction of Slab- Culvert in front of the house of Ismail at Darpail Sansad. 1 |
Completion of work |
-
latitude : 25.29795225,25.29795225
Longitude : 88.63752277,88.63752277
file name : Image_03022023123941469.png
|
2023-02-03 12:39:41.579348 |
386 |
46542224 |
Construction of Cement Concrete Road from the house of Bulbul Choudhury Godown towords the house |
250000 |
Construction of Cement Concrete Road from the house of Bulbul Choudhury Godown towords the house 1 |
Roof laid |
-
latitude : 25.27706948,25.27706948
Longitude : 88.62275982,88.62275982
file name : Image_13042023091359694.png
|
2023-04-13 09:13:59.791798 |
387 |
46542224 |
Construction of Cement Concrete Road from the house of Bulbul Choudhury Godown towords the house |
250000 |
Construction of Cement Concrete Road from the house of Bulbul Choudhury Godown towords the house 1 |
Plinth level |
-
latitude : 25.27708142,25.27708142
Longitude : 88.62274535,88.62274535
file name : Image_10042023092239529.png
|
2023-04-10 09:22:39.630759 |
388 |
46542224 |
Construction of Cement Concrete Road from the house of Bulbul Choudhury Godown towords the house |
250000 |
Construction of Cement Concrete Road from the house of Bulbul Choudhury Godown towords the house 1 |
Completion of work |
-
latitude : 25.27707728,25.27707723
Longitude : 88.62272269,88.62272256
file name : Image_22022023110853538.png
|
2023-02-22 11:08:53.624531 |
389 |
46836940 |
Construction of Cement Concrete/Bricks Drain from Bilaikuri Mukh towords the house of Sonatan at S |
248839 |
Construction of Cement Concrete/Bricks Drain from Bilaikuri Mukh towords the house of Sonatan at S1 |
Roof laid |
-
latitude : 25.265823,25.265823
Longitude : 88.5805086,88.5805086
file name : Image_13042023091407923.png
|
2023-04-13 09:14:08.017852 |
390 |
46836940 |
Construction of Cement Concrete/Bricks Drain from Bilaikuri Mukh towords the house of Sonatan at S |
248839 |
Construction of Cement Concrete/Bricks Drain from Bilaikuri Mukh towords the house of Sonatan at S1 |
Plinth level |
-
latitude : 25.2658222,25.2658222
Longitude : 88.5805269,88.5805269
file name : Image_23032023103840569.png
|
2023-03-23 10:38:40.670555 |
391 |
46836940 |
Construction of Cement Concrete/Bricks Drain from Bilaikuri Mukh towords the house of Sonatan at S |
248839 |
Construction of Cement Concrete/Bricks Drain from Bilaikuri Mukh towords the house of Sonatan at S1 |
Completion of work |
-
latitude : 25.26577192,25.26577171
Longitude : 88.5801446,88.58014149
file name : Image_19092022140437638.png
|
2022-09-19 14:04:37.747342 |
392 |
46543136 |
Construction of Cement Concrete Road from the house of Bhoda towords the house Safiuddin a |
200000 |
Construction of Cement Concrete Road from the house of Bhoda towords the house Safiuddin a1 |
Roof laid |
-
latitude : 25.28564476,25.28564167
Longitude : 88.60621359,88.6062143
file name : Image_13042023091412373.png
|
2023-04-13 09:14:12.455475 |
393 |
46543136 |
Construction of Cement Concrete Road from the house of Bhoda towords the house Safiuddin a |
200000 |
Construction of Cement Concrete Road from the house of Bhoda towords the house Safiuddin a1 |
Completion of work |
-
latitude : 25.28565098,25.28565103
Longitude : 88.60619102,88.60619101
file name : Image_19092022140445212.png
|
2022-09-19 14:04:45.307112 |
394 |
57907542 |
Installation of Solar Sub Marsible Pump with reserver in front of near Nejamaddin house at Darpail |
150000 |
Installation of Solar Sub Marsible Pump with reserver in front of near Nejamaddin house at Darpail1 |
Plinth level |
-
latitude : 25.29193902
Longitude : 88.63198301
file name : Image_26032023151920615.png
|
2023-03-26 15:19:20.720572 |
395 |
57907542 |
Installation of Solar Sub Marsible Pump with reserver in front of near Nejamaddin house at Darpail |
150000 |
Installation of Solar Sub Marsible Pump with reserver in front of near Nejamaddin house at Darpail1 |
Completion of work |
-
latitude : 25.29192594
Longitude : 88.63193913
file name : Image_14032023135630208.png
|
2023-03-14 13:56:30.342839 |
396 |
57871176 |
Installation of Solar Marsible Pump with reserver in Front of near Suktapara Masjid at Durgapur |
300000 |
Installation of Solar Marsible Pump with reserver in Front of near Suktapara Masjid at Durgapur1 |
Roof laid |
-
latitude : 25.31557859
Longitude : 88.61341708
file name : Image_02042023111312221.png
|
2023-04-02 11:13:12.304385 |
397 |
57871176 |
Installation of Solar Marsible Pump with reserver in Front of near Suktapara Masjid at Durgapur |
300000 |
Installation of Solar Marsible Pump with reserver in Front of near Suktapara Masjid at Durgapur1 |
Plinth level |
-
latitude : 25.3155869
Longitude : 88.61343232
file name : Image_26032023151929385.png
|
2023-03-26 15:19:29.516382 |
398 |
57871176 |
Installation of Solar Marsible Pump with reserver in Front of near Suktapara Masjid at Durgapur |
300000 |
Installation of Solar Marsible Pump with reserver in Front of near Suktapara Masjid at Durgapur1 |
Completion of work |
-
latitude : 25.31560931
Longitude : 88.61341164
file name : Image_14032023135636656.png
|
2023-03-14 13:56:36.736642 |
399 |
57872319 |
Installation of Solar Sub Marsible pump With Reserver in Front Of Near Bajimuddin sarkar House Jamin |
300000 |
Installation of Solar Sub Marsible pump With Reserver in Front Of Near Bajimuddin sarkar House Jamin1 |
Roof laid |
-
latitude : 25.30110557
Longitude : 88.63022386
file name : Image_02042023111308586.png
|
2023-04-02 11:13:08.67455 |
400 |
57872319 |
Installation of Solar Sub Marsible pump With Reserver in Front Of Near Bajimuddin sarkar House Jamin |
300000 |
Installation of Solar Sub Marsible pump With Reserver in Front Of Near Bajimuddin sarkar House Jamin1 |
Plinth level |
-
latitude : 25.30112144
Longitude : 88.63022171
file name : Image_26032023151925637.png
|
2023-03-26 15:19:25.743179 |
401 |
57872319 |
Installation of Solar Sub Marsible pump With Reserver in Front Of Near Bajimuddin sarkar House Jamin |
300000 |
Installation of Solar Sub Marsible pump With Reserver in Front Of Near Bajimuddin sarkar House Jamin1 |
Completion of work |
-
latitude : 25.30113481
Longitude : 88.63019678
file name : Image_14032023135623218.png
|
2023-03-14 13:56:23.31232 |
402 |
57865266 |
Installation of Solar Sub Marsible Pump With reserver in Front of Dwipkhanda Dighipara Near Sukumar |
300000 |
Installation of Solar Sub Marsible Pump With reserver in Front of Dwipkhanda Dighipara Near Sukumar 1 |
Roof laid |
-
latitude : 25.29567106
Longitude : 88.60037863
file name : Image_02042023111315958.png
|
2023-04-02 11:13:16.048964 |
403 |
57865266 |
Installation of Solar Sub Marsible Pump With reserver in Front of Dwipkhanda Dighipara Near Sukumar |
300000 |
Installation of Solar Sub Marsible Pump With reserver in Front of Dwipkhanda Dighipara Near Sukumar 1 |
Plinth level |
-
latitude : 25.29564857
Longitude : 88.60038685
file name : Image_26032023151934358.png
|
2023-03-26 15:19:34.451918 |
404 |
57865266 |
Installation of Solar Sub Marsible Pump With reserver in Front of Dwipkhanda Dighipara Near Sukumar |
300000 |
Installation of Solar Sub Marsible Pump With reserver in Front of Dwipkhanda Dighipara Near Sukumar 1 |
Completion of work |
-
latitude : 25.2957509
Longitude : 88.60040918
file name : Image_14032023135650501.png
|
2023-03-14 13:56:50.606871 |
405 |
57904549 |
Construction of CC Road From the house of Pulak Kumar saha House Towards Amit Kr Das Jaminishchinta |
275000 |
Construction of CC Road From the house of Pulak Kumar saha House Towards Amit Kr Das Jaminishchinta1 |
Roof laid |
-
latitude : 25.29754898,25.29754898
Longitude : 88.63105136,88.63105136
file name : Image_21052023100948746.png
|
2023-05-21 10:09:48.831293 |
406 |
57904549 |
Construction of CC Road From the house of Pulak Kumar saha House Towards Amit Kr Das Jaminishchinta |
275000 |
Construction of CC Road From the house of Pulak Kumar saha House Towards Amit Kr Das Jaminishchinta1 |
Plinth level |
-
latitude : 25.29756228,25.29756791
Longitude : 88.6312036,88.63119936
file name : Image_07052023074343790.png
|
2023-05-07 07:43:43.893557 |
407 |
57904549 |
Construction of CC Road From the house of Pulak Kumar saha House Towards Amit Kr Das Jaminishchinta |
275000 |
Construction of CC Road From the house of Pulak Kumar saha House Towards Amit Kr Das Jaminishchinta1 |
Completion of work |
-
latitude : 25.2975443,25.2975443
Longitude : 88.6314619,88.6314619
file name : Image_16032023151334613.png
|
2023-03-16 15:13:34.711018 |
408 |
57902217 |
Construction of CC RoadFrom the House of Makbul House Towards Hamidur House at Kistapur |
275000 |
Construction of CC RoadFrom the House of Makbul House Towards Hamidur House at Kistapur1 |
Roof laid |
-
latitude : 25.2731476,25.2731476
Longitude : 88.60359964,88.60359964
file name : Image_13042023091403616.png
|
2023-04-13 09:14:03.706163 |
409 |
57902217 |
Construction of CC RoadFrom the House of Makbul House Towards Hamidur House at Kistapur |
275000 |
Construction of CC RoadFrom the House of Makbul House Towards Hamidur House at Kistapur1 |
Plinth level |
-
latitude : 25.27311631,25.27311999
Longitude : 88.60360429,88.6035972
file name : Image_10042023092242785.png
|
2023-04-10 09:22:42.876316 |
410 |
57902217 |
Construction of CC RoadFrom the House of Makbul House Towards Hamidur House at Kistapur |
275000 |
Construction of CC RoadFrom the House of Makbul House Towards Hamidur House at Kistapur1 |
Completion of work |
-
latitude : 25.27318124,25.27318125
Longitude : 88.60360313,88.60360314
file name : Image_22022023111001544.png
|
2023-02-22 11:10:01.638575 |
411 |
57901303 |
Construction of CC Road From Nurmahhad house Towards Rasidul House at Darpail |
275000 |
Construction of CC Road From Nurmahhad house Towards Rasidul House at Darpail1 |
Roof laid |
-
latitude : 25.29853956,25.29853955
Longitude : 88.63840725,88.63840725
file name : Image_21052023100945540.png
|
2023-05-21 10:09:45.632276 |
412 |
57901303 |
Construction of CC Road From Nurmahhad house Towards Rasidul House at Darpail |
275000 |
Construction of CC Road From Nurmahhad house Towards Rasidul House at Darpail1 |
Plinth level |
-
latitude : 25.29851154,25.29851154
Longitude : 88.63833098,88.63833098
file name : Image_28042023124656042.png
|
2023-04-28 12:46:56.817861 |
413 |
57901303 |
Construction of CC Road From Nurmahhad house Towards Rasidul House at Darpail |
275000 |
Construction of CC Road From Nurmahhad house Towards Rasidul House at Darpail1 |
Completion of work |
-
latitude : 25.29858443,25.29858443
Longitude : 88.63842565,88.63842565
file name : Image_27042023120853741.png
|
2023-04-27 12:08:54.087548 |
414 |
46837927 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Talpara near Moslem Sarkar house a |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Talpara near Moslem Sarkar house a1 |
Roof laid |
-
latitude : 25.29582076,25.29582076
Longitude : 88.59457638,88.59457638
file name : Image_24112022095956289.png
|
2022-11-24 09:59:56.398961 |
415 |
46837927 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Talpara near Moslem Sarkar house a |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Talpara near Moslem Sarkar house a1 |
Plinth level |
-
latitude : 25.29574729,25.29574729
Longitude : 88.59461115,88.59461115
file name : Image_07112022113315976.png
|
2022-11-07 11:33:16.084878 |
416 |
46837927 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Talpara near Moslem Sarkar house a |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Talpara near Moslem Sarkar house a1 |
Completion of work |
-
latitude : 25.29680537,25.29680537
Longitude : 88.59358371,88.59358371
file name : Image_23032022103828416.png
|
2022-03-23 10:38:28.516732 |
417 |
46841433 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Jamai at Sarifabad |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Jamai at Sarifabad 1 |
Plinth level |
-
latitude : 25.27771445,25.27771406
Longitude : 88.58799219,88.58799191
file name : Image_09012023151600905.png
|
2023-01-09 15:16:01.012186 |
418 |
46841433 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Jamai at Sarifabad |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Jamai at Sarifabad 1 |
Roof laid |
-
latitude : 25.27775024,25.27775003
Longitude : 88.58811571,88.58811612
file name : Image_12012023114022800.png
|
2023-01-12 11:40:22.920139 |
419 |
46841433 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Jamai at Sarifabad |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Jamai at Sarifabad 1 |
Completion of work |
-
latitude : 25.2777704,25.27777037
Longitude : 88.5881936,88.58819358
file name : Image_07112022113512424.png
|
2022-11-07 11:35:12.531106 |
420 |
46841433 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Jamai at Sarifabad |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of the house of Jamai at Sarifabad 1 |
Completion of work |
-
latitude : 25.2777704,25.27777037
Longitude : 88.5881936,88.58819358
file name : Image_07112022113631660.png
|
2022-11-07 11:36:31.782358 |
421 |
46832226 |
Construction of Cement Concrete/Bricks Drain from theTalpara Napukur towords to the house of Mamun |
300000 |
Construction of Cement Concrete/Bricks Drain from theTalpara Napukur towords to the house of Mamun 1 |
Roof laid |
-
latitude : 25.2976297,25.2976297
Longitude : 88.59372203,88.59372201
file name : Image_02032023151113000.png
|
2023-03-02 15:11:13.083453 |
422 |
46832226 |
Construction of Cement Concrete/Bricks Drain from theTalpara Napukur towords to the house of Mamun |
300000 |
Construction of Cement Concrete/Bricks Drain from theTalpara Napukur towords to the house of Mamun 1 |
Plinth level |
-
latitude : 25.29758453,25.29758453
Longitude : 88.59355069,88.59355069
file name : Image_12012023113650797.png
|
2023-01-12 11:36:50.902575 |
423 |
46832226 |
Construction of Cement Concrete/Bricks Drain from theTalpara Napukur towords to the house of Mamun |
300000 |
Construction of Cement Concrete/Bricks Drain from theTalpara Napukur towords to the house of Mamun 1 |
Completion of work |
-
latitude : 25.29762866,25.29762695
Longitude : 88.59362123,88.5936206
file name : Image_07112022113615235.png
|
2022-11-07 11:36:15.343487 |
424 |
46838619 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Panjara Mosjid at Darpail a Sansa |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Panjara Mosjid at Darpail a Sansa1 |
Roof laid |
-
latitude : 25.29645289,25.29645289
Longitude : 88.6297207,88.6297207
file name : Image_16032023151331248.png
|
2023-03-16 15:13:31.381312 |
425 |
46838619 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Panjara Mosjid at Darpail a Sansa |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Panjara Mosjid at Darpail a Sansa1 |
Plinth level |
-
latitude : 25.29638958,25.29638958
Longitude : 88.62981916,88.62981916
file name : Image_09012023151604913.png
|
2023-01-09 15:16:05.015932 |
426 |
46838619 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Panjara Mosjid at Darpail a Sansa |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Panjara Mosjid at Darpail a Sansa1 |
Completion of work |
-
latitude : 25.29646805,25.29646879
Longitude : 88.62979094,88.62979082
file name : Image_03122022110755283.png
|
2022-12-03 11:07:55.37916 |
427 |
46838841 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Mosjid Dakshin Para at Durgapur Sa |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Mosjid Dakshin Para at Durgapur Sa1 |
Roof laid |
-
latitude : 25.30835439,25.30835439
Longitude : 88.61734461,88.61734461
file name : Image_23032023103904486.png
|
2023-03-23 10:39:04.582403 |
428 |
46838841 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Mosjid Dakshin Para at Durgapur Sa |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Mosjid Dakshin Para at Durgapur Sa1 |
Plinth level |
-
latitude : 25.3083489,25.3083489
Longitude : 88.61734334,88.61734334
file name : Image_20032023134214813.png
|
2023-03-20 13:42:14.919763 |
429 |
46838841 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Mosjid Dakshin Para at Durgapur Sa |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Mosjid Dakshin Para at Durgapur Sa1 |
Plinth level |
-
latitude : 25.30843733,25.30843733
Longitude : 88.6172838,88.6172838
file name : Image_02032023151144387.png
|
2023-03-02 15:11:44.491601 |
430 |
46838841 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Mosjid Dakshin Para at Durgapur Sa |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Mosjid Dakshin Para at Durgapur Sa1 |
Completion of work |
-
latitude : 25.3083451,25.3083451
Longitude : 88.61730592,88.61730592
file name : Image_07112022113555348.png
|
2022-11-07 11:35:55.449924 |
431 |
46838841 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Mosjid Dakshin Para at Durgapur Sa |
230000 |
Installation of Solar Sub-Marsible Pump with reserver in Front of Mosjid Dakshin Para at Durgapur Sa1 |
Completion of work |
-
latitude : 25.3083451,25.3083451
Longitude : 88.61730592,88.61730592
file name : Image_07112022113700972.png
|
2022-11-07 11:37:01.077327 |
432 |
67599301 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.27412079
Longitude : 88.60323931
file name : Image_26112023114346855.png
|
2023-11-26 11:43:46.961905 |
433 |
67599301 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.27409443
Longitude : 88.60324379
file name : Image_20112023085519319.png
|
2023-11-20 08:55:19.410666 |
434 |
67599301 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.2865826
Longitude : 88.60607511
file name : Image_01112023123633242.png
|
2023-11-01 12:36:33.395087 |
435 |
67599466 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.2644687
Longitude : 88.59640646
file name : Image_01082024144056161.png
|
2024-08-01 14:40:56.255507 |
436 |
67599466 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.26435899
Longitude : 88.5964436
file name : Image_18072024162648527.png
|
2024-07-18 16:26:48.599392 |
437 |
67599466 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.26448322
Longitude : 88.59645572
file name : Image_02072024110158639.png
|
2024-07-02 11:01:58.715078 |
438 |
67598804 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.2980858
Longitude : 88.6324454
file name : Image_26072024123429549.png
|
2024-07-26 12:34:29.624851 |
439 |
67151214 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 25.28333869,25.28328816
Longitude : 88.61940434,88.61981114
file name : Image_13092024151751641.png
|
2024-09-13 15:17:51.707283 |
440 |
67151214 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 25.28336519,25.28336477
Longitude : 88.62008064,88.62008034
file name : Image_13092024150732348.png
|
2024-09-13 15:07:32.429517 |
441 |
67151214 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 25.28329053,25.28334947
Longitude : 88.61982323,88.61984257
file name : Image_15062024102252527.png
|
2024-06-15 10:22:52.591461 |
442 |
67598322 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.30803951
Longitude : 88.60817897
file name : Image_07082024130010146.png
|
2024-08-07 13:00:23.325333 |
443 |
67598322 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.3079164
Longitude : 88.60837558
file name : Image_18072024164413340.png
|
2024-07-18 16:44:13.408882 |
444 |
67598322 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.30793272
Longitude : 88.60830582
file name : Image_21062024175522866.png
|
2024-06-21 17:55:22.939073 |
445 |
67308002 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 25.29643629
Longitude : 88.62982785
file name : Image_17072024111652495.png
|
2024-07-17 11:16:52.567347 |
446 |
67308002 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 25.29650592
Longitude : 88.62973438
file name : Image_08072024142319916.png
|
2024-07-08 14:23:19.987815 |
447 |
67308002 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 25.29638074
Longitude : 88.62982978
file name : Image_22062024132218921.png
|
2024-06-22 13:22:18.9916 |
448 |
89160313 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.29816937,25.29816383
Longitude : 88.63748773,88.63750919
file name : Image_01102024123638796.png
|
2024-10-01 12:36:38.858368 |
449 |
89160313 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.29835239,25.29835818
Longitude : 88.63772348,88.6377537
file name : Image_01102024122350475.png
|
2024-10-01 12:23:50.548682 |
450 |
89160313 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.2984115,25.29841244
Longitude : 88.63773178,88.63772916
file name : Image_30092024164900428.png
|
2024-09-30 16:49:00.492794 |
451 |
67345701 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 25.28902853
Longitude : 88.60791238
file name : Image_08072024142212999.png
|
2024-07-08 14:22:13.073956 |
452 |
67345701 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 25.28906758
Longitude : 88.60775864
file name : Image_08072024140542750.png
|
2024-07-08 14:05:42.823548 |
453 |
67345701 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 25.28910843
Longitude : 88.60776833
file name : Image_08072024140518643.png
|
2024-07-08 14:05:18.602298 |
454 |
67345701 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 25.28899785
Longitude : 88.6078015
file name : Image_21062024151023142.png
|
2024-06-21 15:10:23.220845 |
455 |
67574881 |
Construction of roads |
300000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.30096197,25.30096407
Longitude : 88.6325674,88.63257666
file name : Image_23072024153041609.png
|
2024-07-23 15:30:41.934147 |
456 |
67574881 |
Construction of roads |
300000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.3008219,25.3008219
Longitude : 88.6320334,88.6320334
file name : Image_18072024162637066.png
|
2024-07-18 16:26:37.127213 |
457 |
67574881 |
Construction of roads |
300000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.30086825,25.30086636
Longitude : 88.63248624,88.63249996
file name : Image_15072024165833329.png
|
2024-07-15 16:58:33.493941 |
458 |
67890547 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.29684181
Longitude : 88.59236792
file name : Image_07082024125334410.png
|
2024-08-07 12:53:35.294897 |
459 |
67890547 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.29668789
Longitude : 88.5923453
file name : Image_07082024123638898.png
|
2024-08-07 12:36:38.976362 |
460 |
67890547 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.29669309
Longitude : 88.59223032
file name : Image_01082024115728616.png
|
2024-08-01 11:57:28.683574 |
461 |
67308332 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 25.30383188
Longitude : 88.61528374
file name : Image_11092024091851460.png
|
2024-09-11 09:21:10.048652 |
462 |
67308332 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 25.30394711
Longitude : 88.61525752
file name : Image_08092024145722505.png
|
2024-09-08 14:58:48.050486 |
463 |
67308332 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 25.30396381
Longitude : 88.615244
file name : Image_08092024145718721.png
|
2024-09-08 14:58:44.287832 |
464 |
67308332 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 25.30393607
Longitude : 88.61524907
file name : Image_01082024114052899.png
|
2024-08-01 11:40:52.974752 |
465 |
67308332 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 25.30390951
Longitude : 88.61522392
file name : Image_01082024114048657.png
|
2024-08-01 11:40:48.764263 |
466 |
67308391 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 25.27039355
Longitude : 88.62891454
file name : Image_26072024122101311.png
|
2024-07-26 12:21:01.386553 |
467 |
67308391 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 25.27040119
Longitude : 88.62890852
file name : Image_26072024121752340.png
|
2024-07-26 12:17:52.414482 |
468 |
67308391 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 25.27041151
Longitude : 88.62884385
file name : Image_26072024121339994.png
|
2024-07-26 12:13:40.075933 |
469 |
67598869 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.30331427
Longitude : 88.6370745
file name : Image_11122023145930799.png
|
2023-12-11 14:59:30.888409 |
470 |
67598869 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.3033419
Longitude : 88.63703563
file name : Image_20112023085428471.png
|
2023-11-20 08:54:28.551275 |
471 |
67598869 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.30333301
Longitude : 88.63705438
file name : Image_01112023123555804.png
|
2023-11-01 12:35:55.94691 |
472 |
89450090 |
Installation of Information Board |
70000 |
Administrative Cost |
Roof laid |
-
latitude : 25.2963172
Longitude : 88.6316512
file name : Image_26072024182426841.png
|
2024-07-26 18:24:26.907925 |
473 |
89450090 |
Installation of Information Board |
70000 |
Administrative Cost |
Plinth level |
-
latitude : 25.2963191
Longitude : 88.63165
file name : Image_26072024181859695.png
|
2024-07-26 18:18:59.762215 |
474 |
89450090 |
Installation of Information Board |
70000 |
Administrative Cost |
Completion of work |
-
latitude : 25.2963175
Longitude : 88.6316485
file name : Image_26072024181437192.png
|
2024-07-26 18:14:37.25569 |
475 |
67599548 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.27806568
Longitude : 88.5967641
file name : Image_06082024165353343.png
|
2024-08-06 16:53:53.328357 |
476 |
67599548 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.2780724
Longitude : 88.59676588
file name : Image_06082024164729417.png
|
2024-08-06 16:47:29.507731 |
477 |
67599548 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.27805438
Longitude : 88.596763
file name : Image_06082024164123936.png
|
2024-08-06 16:41:24.026704 |
478 |
57903192 |
Construction of CC Road From The House of Soma House Towards Chakahar ICDS jajiar |
275000 |
Construction of CC Road From The House of Soma House Towards Chakahar ICDS jajiar1 |
Roof laid |
-
latitude : 25.30966009,25.30967346
Longitude : 88.643525,88.64347962
file name : Image_05082024135341266.png
|
2024-08-05 13:53:41.34833 |
479 |
57903192 |
Construction of CC Road From The House of Soma House Towards Chakahar ICDS jajiar |
275000 |
Construction of CC Road From The House of Soma House Towards Chakahar ICDS jajiar1 |
Plinth level |
-
latitude : 25.31017809,25.31019977
Longitude : 88.64365685,88.64364936
file name : Image_04012024114857609.png
|
2024-01-04 11:48:57.691303 |
480 |
57903192 |
Construction of CC Road From The House of Soma House Towards Chakahar ICDS jajiar |
275000 |
Construction of CC Road From The House of Soma House Towards Chakahar ICDS jajiar1 |
Plinth level |
-
latitude : 25.31026837,25.31028569
Longitude : 88.64369829,88.64368303
file name : Image_30122023130212370.png
|
2023-12-30 13:02:12.474144 |
481 |
57903192 |
Construction of CC Road From The House of Soma House Towards Chakahar ICDS jajiar |
275000 |
Construction of CC Road From The House of Soma House Towards Chakahar ICDS jajiar1 |
Plinth level |
-
latitude : 25.31017953,25.31011816
Longitude : 88.64362069,88.64365063
file name : Image_27122023105416536.png
|
2023-12-27 10:54:16.618122 |
482 |
57903192 |
Construction of CC Road From The House of Soma House Towards Chakahar ICDS jajiar |
275000 |
Construction of CC Road From The House of Soma House Towards Chakahar ICDS jajiar1 |
Completion of work |
-
latitude : 25.31016488,25.31011966
Longitude : 88.64361029,88.64356414
file name : Image_06062023131731283.png
|
2023-06-06 13:17:31.386806 |
483 |
89158575 |
Construction of roads |
300000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.26630731,25.26616542
Longitude : 88.62881015,88.62930609
file name : Image_16082024150007972.png
|
2024-08-16 15:00:08.038768 |
484 |
89158575 |
Construction of roads |
300000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.26628477,25.26620763
Longitude : 88.62935671,88.62934491
file name : Image_16082024145109499.png
|
2024-08-16 14:51:09.562203 |
485 |
89158575 |
Construction of roads |
300000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.26615384,25.26615331
Longitude : 88.62961836,88.62939123
file name : Image_11082024174122924.png
|
2024-08-11 17:41:23.001833 |
486 |
89187370 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.27440163
Longitude : 88.57765997
file name : Image_20092024135000257.png
|
2024-09-20 13:50:00.320454 |
487 |
89187370 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.27440698
Longitude : 88.57767033
file name : Image_20092024134817550.png
|
2024-09-20 13:48:17.616951 |
488 |
89187370 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.27441403
Longitude : 88.57764137
file name : Image_20092024134318093.png
|
2024-09-20 13:43:18.161253 |
489 |
89187370 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.27451856
Longitude : 88.5776636
file name : Image_23082024120758718.png
|
2024-08-23 12:07:58.79521 |
490 |
89226529 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 25.31207388
Longitude : 88.60107905
file name : Image_23082024114207254.png
|
2024-08-23 11:42:07.334364 |
491 |
89226529 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 25.31229714
Longitude : 88.60100119
file name : Image_21082024134532556.png
|
2024-08-21 13:45:32.700503 |
492 |
89226529 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 25.31206613
Longitude : 88.60122089
file name : Image_11082024155042424.png
|
2024-08-11 15:50:42.4918 |
493 |
89187757 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.2926512
Longitude : 88.60971443
file name : Image_09092024153802347.png
|
2024-09-09 15:39:47.626514 |
494 |
89188764 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.25356245
Longitude : 88.60981869
file name : Image_13092024122622352.png
|
2024-09-13 12:26:22.428883 |
495 |
89188764 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.25357768
Longitude : 88.60984523
file name : Image_13092024121956233.png
|
2024-09-13 12:19:56.29412 |
496 |
89188764 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.2534776
Longitude : 88.6097126
file name : Image_21082024130525315.png
|
2024-08-21 13:05:25.394745 |
497 |
89189302 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.27675208
Longitude : 88.61935924
file name : Image_01102024162908992.png
|
2024-10-01 16:29:09.07879 |
498 |
89189302 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.29806685
Longitude : 88.63774663
file name : Image_01102024161353809.png
|
2024-10-01 16:13:53.887766 |
499 |
89189302 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.27676481
Longitude : 88.61931331
file name : Image_21082024132428055.png
|
2024-08-21 13:24:28.298216 |
500 |
89188887 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.30128378
Longitude : 88.63720711
file name : Image_11092024162013386.png
|
2024-09-11 16:20:13.467218 |
501 |
89188887 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.30134308
Longitude : 88.63729654
file name : Image_11092024160723643.png
|
2024-09-11 16:07:23.730488 |
502 |
89188887 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.30122423
Longitude : 88.63701741
file name : Image_09092024155234464.png
|
2024-09-09 15:54:19.944273 |
503 |
89189162 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.30034957
Longitude : 88.63180965
file name : Image_18092024161300309.png
|
2024-09-18 16:13:00.372488 |
504 |
89189162 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.30268251
Longitude : 88.63645798
file name : Image_18092024143931587.png
|
2024-09-18 14:39:31.663447 |
505 |
89189162 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.3027881
Longitude : 88.63674735
file name : Image_08092024141308057.png
|
2024-09-08 14:14:33.021375 |
506 |
89188284 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 25.29602918
Longitude : 88.6271672
file name : Image_13092024153648280.png
|
2024-09-13 15:36:48.361762 |
507 |
89188284 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 25.29603212
Longitude : 88.62713141
file name : Image_13092024153008279.png
|
2024-09-13 15:30:08.352292 |
508 |
89188284 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.29598372
Longitude : 88.62704705
file name : Image_08092024142205860.png
|
2024-09-08 14:23:30.935933 |