1 |
39058191 |
Installation of Mark-II Tube Well with Soak Pit near Mahatab house Jama Masjid at Jharbari Malingoan |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Mahatab house Jama Masjid at Jharbari Malingoan1 |
Plinth level |
-
latitude : 26.050990554504097
Longitude : 87.96604041941464
file name : Image_24032021163452038.png
|
2021-03-24 16:34:52.138655 |
2 |
39058191 |
Installation of Mark-II Tube Well with Soak Pit near Mahatab house Jama Masjid at Jharbari Malingoan |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Mahatab house Jama Masjid at Jharbari Malingoan1 |
Plinth level |
-
latitude : 26.050990554504097
Longitude : 87.96604041941464
file name : Image_24032021163502052.png
|
2021-03-24 16:35:02.153138 |
3 |
39058191 |
Installation of Mark-II Tube Well with Soak Pit near Mahatab house Jama Masjid at Jharbari Malingoan |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Mahatab house Jama Masjid at Jharbari Malingoan1 |
Completion of work |
-
latitude : 26.05115655809641
Longitude : 87.96616380102932
file name : Image_06032021135615400.png
|
2021-03-06 13:56:15.516105 |
4 |
47590799 |
CONSTRUCTION OF PCC DRAIN WITH COVER AT AIJUDDIN HOUSE TO SAMSUL HOUSE UNDER PASCHIJ BALDIABASA |
250009 |
CONSTRUCTION OF PCC DRAIN WITH COVER AT AIJUDDIN HOUSE TO SAMSUL HOUSE UNDER PASCHIJ BALDIABASA1 |
Completion of work |
-
latitude : 26.065022866241634,26.065022866241634,26.0650402167812
Longitude : 87.99831334501505,87.99831334501505,87.99831141717732
file name : Image_29032022173940751.png
|
2022-03-29 17:39:40.857297 |
5 |
47749882 |
PCC CULVERT AT NUKANI FELD PURBA KAMARSHAL SANSAD |
228860 |
PCC CULVERT AT NUKANI FELD PURBA KAMARSHAL SANSAD1 |
Plinth level |
-
latitude : 26.045118905603886,26.063588932156563
Longitude : 87.94389551505446,87.90686401538551
file name : Image_27092021144911302.png
|
2021-09-27 14:49:11.417651 |
6 |
47749882 |
PCC CULVERT AT NUKANI FELD PURBA KAMARSHAL SANSAD |
228860 |
PCC CULVERT AT NUKANI FELD PURBA KAMARSHAL SANSAD1 |
Completion of work |
-
latitude : 26.063569360412657,26.063607498072088
Longitude : 87.90681146085262,87.9068404622376
file name : Image_23092021160844807.png
|
2021-09-23 16:08:44.913349 |
7 |
35118750 |
CONSTRUCTION OF PCC ROAD FROM LAKHAN HOUSE TO HARESH HOUSE AT BINARDAH |
250000 |
CONSTRUCTION OF PCC ROAD FROM LAKHAN HOUSE TO HARESH HOUSE AT BINARDAH1 |
Plinth level |
-
latitude : 26.02095345966518,26.020968547090888
Longitude : 87.928063608706,87.92803343385458
file name : Image_08122021154409965.png
|
2021-12-08 15:44:10.068834 |
8 |
47526807 |
CONSRUCTION OF PCC ROAD FORM MAJIBUR RAHAMAN HOUSE TO ASFAK HOUSE UNDER BARODIA SANSAD. |
250000 |
CONSRUCTION OF PCC ROAD FORM MAJIBUR RAHAMAN HOUSE TO ASFAK HOUSE UNDER BARODIA SANSAD.1 |
Plinth level |
-
latitude : 26.07383438386023,26.073795910924673
Longitude : 87.91566333733499,87.91564959101379
file name : Image_27122021170309243.png
|
2021-12-27 17:03:09.354043 |
9 |
47526807 |
CONSRUCTION OF PCC ROAD FORM MAJIBUR RAHAMAN HOUSE TO ASFAK HOUSE UNDER BARODIA SANSAD. |
250000 |
CONSRUCTION OF PCC ROAD FORM MAJIBUR RAHAMAN HOUSE TO ASFAK HOUSE UNDER BARODIA SANSAD.1 |
Completion of work |
-
latitude : 26.073675421066582,26.073627434670925
Longitude : 87.91647168807685,87.91649440303445
file name : Image_20122021160827402.png
|
2021-12-20 16:08:27.508874 |
10 |
47527115 |
CONSRUCTION OF PCC ROAD FORM AAM BAGAN TO BOATGACH UNDER BHARNA SANSAD. |
250000 |
CONSRUCTION OF PCC ROAD FORM AAM BAGAN TO BOATGACH UNDER BHARNA SANSAD.1 |
Completion of work |
-
latitude : 26.032893480733037,26.032978096045554
Longitude : 87.91547315195203,87.91543434374034
file name : Image_01092022115512098.png
|
2022-09-01 11:55:12.224397 |
11 |
47527115 |
CONSRUCTION OF PCC ROAD FORM AAM BAGAN TO BOATGACH UNDER BHARNA SANSAD. |
250000 |
CONSRUCTION OF PCC ROAD FORM AAM BAGAN TO BOATGACH UNDER BHARNA SANSAD.1 |
Completion of work |
-
latitude : 26.03297285735607,26.03298421483487
Longitude : 87.9153850581497,87.91541858576238
file name : Image_26072022174856265.png
|
2022-07-26 17:48:56.386163 |
12 |
47527366 |
CONSRUCTION OF PCC ROAD FORM KASIM LAND TO SAYEEDUR RAHAMAN LAND UNDER JHARBARI MALINGA8N SANSAD. |
250000 |
CONSRUCTION OF PCC ROAD FORM KASIM LAND TO SAYEEDUR RAHAMAN LAND UNDER JHARBARI MALINGA8N SANSAD.1 |
Completion of work |
-
latitude : 26.05459364131093,26.054609399288893
Longitude : 87.97291617840528,87.97300804406404
file name : Image_06092022152847221.png
|
2022-09-06 15:28:47.3257 |
13 |
47730116 |
CONSTRUCTION OF PCC DRAIN WITH COVER FROM HAJRAT HOUSE TO SUDHANI AT PATWA |
250000 |
CONSTRUCTION OF PCC DRAIN WITH COVER FROM HAJRAT HOUSE TO SUDHANI AT PATWA1 |
Completion of work |
-
latitude : 26.0704699,26.0704699,26.0704699
Longitude : 87.9278545,87.9278545,87.9278545
file name : Image_20082022133746336.png
|
2022-08-20 13:37:46.448943 |
14 |
47560782 |
CONSTRUCTION OF PCC DRAIN WITH COVER AT KALAM HOUSE TO SUDHANI AT U.DUMORIA |
250000 |
CONSTRUCTION OF PCC DRAIN WITH COVER AT KALAM HOUSE TO SUDHANI AT U.DUMORIA1 |
Completion of work |
-
latitude : 26.0704668,26.0704668
Longitude : 87.9278407,87.9278407
file name : Image_06092022152857621.png
|
2022-09-06 15:28:57.734429 |
15 |
47560782 |
CONSTRUCTION OF PCC DRAIN WITH COVER AT KALAM HOUSE TO SUDHANI AT U.DUMORIA |
250000 |
CONSTRUCTION OF PCC DRAIN WITH COVER AT KALAM HOUSE TO SUDHANI AT U.DUMORIA1 |
Completion of work |
-
latitude : 26.0704668,26.0704668
Longitude : 87.9278407,87.9278407
file name : Image_06092022152901900.png
|
2022-09-06 15:29:02.0048 |
16 |
47717886 |
MARK-II TUBEWEL WITH SHOPEPIT AT ADIBASI ICDS CENTRE UNDER PURBA BALDIABASA |
120000 |
MARK-II TUBEWEL WITH SHOPEPIT AT ADIBASI ICDS CENTRE UNDER PURBA BALDIABASA1 |
Completion of work |
-
latitude : 26.06543894391507
Longitude : 87.99873813986778
file name : Image_31012023123502301.png
|
2023-01-31 12:35:02.391334 |
17 |
47525857 |
CONSRUCTION OF PCC ROAD FORM ABDUL LATIF HOUSE TO KABARSTHAN UNDER BANBARI SANSAD. |
250000 |
CONSRUCTION OF PCC ROAD FORM ABDUL LATIF HOUSE TO KABARSTHAN UNDER BANBARI SANSAD.1 |
Completion of work |
-
latitude : 26.07053669169545,26.070539583452046
Longitude : 87.96633655205369,87.96633001416922
file name : Image_06092022152852466.png
|
2022-09-06 15:28:52.574821 |
18 |
47834660 |
CONSTRUCTION OF PCC DRAIN WITH COVER AT MALO HOUSE TO NANDU HOUSE UNDER DEHAGAON SANSAD |
250000 |
CONSTRUCTION OF PCC DRAIN WITH COVER AT MALO HOUSE TO NANDU HOUSE UNDER DEHAGAON SANSAD1 |
Completion of work |
-
latitude : 26.04700667783618,26.046639047563076
Longitude : 87.93624484911561,87.936827307567
file name : Image_11072022134942457.png
|
2022-07-11 13:49:42.584046 |
19 |
56794091 |
CLEANING AND REPAIRING OF DRAIN UNDER DIFFERENT VILLAGES OF BELAN G.P. |
257315 |
CLEANING AND REPAIRING OF DRAIN UNDER DIFFERENT VILLAGES OF BELAN G.P.1 |
Completion of work |
-
latitude : 26.062123524025083,26.061524972319603
Longitude : 87.93998292647302,87.94006624259055
file name : Image_24072022113813100.png
|
2022-07-24 11:38:13.206742 |
20 |
47626587 |
CONSTRUCTION OF PCC ROAD FROM KALAM HOUSE TO HOBUL HOUSE AT SHIRSI |
250000 |
CONSTRUCTION OF PCC ROAD FROM KALAM HOUSE TO HOBUL HOUSE AT SHIRSI1 |
Completion of work |
-
latitude : 26.043974440544844,26.043881149962544
Longitude : 87.93779851868749,87.93772710487247
file name : Image_16082022123445228.png
|
2022-08-16 12:34:45.330237 |
21 |
47626587 |
CONSTRUCTION OF PCC ROAD FROM KALAM HOUSE TO HOBUL HOUSE AT SHIRSI |
250000 |
CONSTRUCTION OF PCC ROAD FROM KALAM HOUSE TO HOBUL HOUSE AT SHIRSI1 |
Plinth level |
-
latitude : 26.044430038891733,26.044383267872036
Longitude : 87.93797261081636,87.93799230828881
file name : Image_16082022123944506.png
|
2022-08-16 12:39:44.60574 |
22 |
56779731 |
REPAIRING AND UPGRADATION OF G.P.OFFICE BUILDING |
308080 |
REPAIRING AND UPGRADATION OF G.P.OFFICE BUILDING1 |
Completion of work |
-
latitude : 26.0704446
Longitude : 87.9278794
file name : Image_17082022173540298.png
|
2022-08-17 17:35:40.552561 |
23 |
56635775 |
COMMUNITY TOILET AT GIRLS MADRASHA UNDER BANBARI SANSAD |
200000 |
COMMUNITY TOILET AT GIRLS MADRASHA UNDER BANBARI SANSAD1 |
Completion of work |
-
latitude : 26.0704699
Longitude : 87.9278545
file name : Image_20082022133749896.png
|
2022-08-20 13:37:50.027028 |
24 |
47526927 |
CONSRUCTION OF PCC ROAD FORM ESTAB ALI HOUSE TO JOHOR HOUSE UNDER UTTAR DUMORIA SANSAD. |
250000 |
CONSRUCTION OF PCC ROAD FORM ESTAB ALI HOUSE TO JOHOR HOUSE UNDER UTTAR DUMORIA SANSAD.1 |
Plinth level |
-
latitude : 26.042427141219378,26.04240656364709
Longitude : 87.94849676080048,87.94854336418211
file name : Image_26082022140052468.png
|
2022-08-26 14:00:52.574922 |
25 |
47526927 |
CONSRUCTION OF PCC ROAD FORM ESTAB ALI HOUSE TO JOHOR HOUSE UNDER UTTAR DUMORIA SANSAD. |
250000 |
CONSRUCTION OF PCC ROAD FORM ESTAB ALI HOUSE TO JOHOR HOUSE UNDER UTTAR DUMORIA SANSAD.1 |
Completion of work |
-
latitude : 26.042259125970304,26.042342986911535
Longitude : 87.94891501776874,87.94891661033034
file name : Image_24082022133245385.png
|
2022-08-24 13:32:45.50943 |
26 |
47670135 |
PAINTING OF G.P OFFICE BUILDING |
150000 |
PAINTING OF G.P OFFICE BUILDING1 |
Completion of work |
-
latitude : 26.0704198
Longitude : 87.9278994
file name : Image_21032022143539134.png
|
2022-03-21 14:35:39.342066 |
27 |
47528378 |
CONSRUCTION OF PCC ROAD FORM PCC ROAD TO IDGAHA GROUND AT CHAPORE |
250000 |
CONSRUCTION OF PCC ROAD FORM PCC ROAD TO IDGAHA GROUND AT CHAPORE1 |
Completion of work |
-
latitude : 26.07029135338962,26.06958668678999
Longitude : 87.9323703981936,87.9321994073689
file name : Image_01112022145041320.png
|
2022-11-01 14:50:41.429553 |
28 |
66657705 |
Creation of a new source of drinking water |
92000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.048637838102877
Longitude : 87.93370789848268
file name : Image_09082023130657371.png
|
2023-08-09 13:06:57.462228 |
29 |
47716900 |
CONSTRUCTION OF PCC ROAD FROM PMGSY ROAD TO BANU HOUSE AT PURBA BALDIABASA |
250000 |
CONSTRUCTION OF PCC ROAD FROM PMGSY ROAD TO BANU HOUSE AT PURBA BALDIABASA1 |
Completion of work |
-
latitude : 26.056653116829693,26.05666539631784
Longitude : 87.9920213855803,87.99200646579266
file name : Image_13092022135407288.png
|
2022-09-13 13:54:07.391163 |
30 |
47713764 |
CONSTRUCTION OF PCC ROAD FORM JAREFUL HOUSE TO ARIF HOUSE AT BINARDHA |
250000 |
CONSTRUCTION OF PCC ROAD FORM JAREFUL HOUSE TO ARIF HOUSE AT BINARDHA1 |
Plinth level |
-
latitude : 26.021595555357635,26.021273438818753
Longitude : 87.92670020833611,87.92675351724029
file name : Image_01032023143211509.png
|
2023-03-01 14:32:11.580291 |
31 |
47713764 |
CONSTRUCTION OF PCC ROAD FORM JAREFUL HOUSE TO ARIF HOUSE AT BINARDHA |
250000 |
CONSTRUCTION OF PCC ROAD FORM JAREFUL HOUSE TO ARIF HOUSE AT BINARDHA1 |
Completion of work |
-
latitude : 26.02127712685615,26.021247999742627
Longitude : 87.92677816003561,87.92674513533711
file name : Image_27022023124054770.png
|
2023-02-27 12:40:54.858246 |
32 |
47592243 |
CONSTRUCTION OF PCC DRAIN WITH COVER FROM PODO DAS HOUSE TO BIMAL DAS HOUSE UNDER CHAPORE SANSAD |
250000 |
CONSTRUCTION OF PCC DRAIN WITH COVER FROM PODO DAS HOUSE TO BIMAL DAS HOUSE UNDER CHAPORE SANSAD1 |
Completion of work |
-
latitude : 26.07072520069778,26.070680608972907
Longitude : 87.9282863996923,87.92827064171433
file name : Image_27032023151606867.png
|
2023-03-27 15:16:06.936516 |
33 |
47543622 |
CONSTRUCTION OF PCC DRAIN WITH SHOP PITAT PARESH HOUSE TO EDGAH AT GOHORRAH |
250000 |
CONSTRUCTION OF PCC DRAIN WITH SHOP PITAT PARESH HOUSE TO EDGAH AT GOHORRAH1 |
Completion of work |
-
latitude : 26.06502705719322,26.065022866241634
Longitude : 87.99830756150186,87.99831334501505
file name : Image_29032022173936039.png
|
2022-03-29 17:39:36.142426 |
34 |
47574595 |
CONSTRUCTION OF PCC DRAIN WITH PREAM LAL HOUSE TO LAKHAN HOUSE UNDER BINARDHA |
250000 |
CONSTRUCTION OF PCC DRAIN WITH PREAM LAL HOUSE TO LAKHAN HOUSE UNDER BINARDHA1 |
Completion of work |
-
latitude : 26.021776562556624,26.0217675101012
Longitude : 87.92521124705672,87.9252035357058
file name : Image_27032023151510217.png
|
2023-03-27 15:15:10.290838 |
35 |
35300390 |
UPGRADATION OF G.P.OFFICE ROOM AND BOUNDRY WALL AT GROUND FLOOR |
250000 |
UPGRADATION OF G.P.OFFICE ROOM AND BOUNDRY WALL AT GROUND FLOOR2 |
Plinth level |
-
latitude : 26.0704597
Longitude : 87.9278956
file name : Image_24032021120224921.png
|
2021-03-24 12:02:24.999474 |
36 |
35300390 |
UPGRADATION OF G.P.OFFICE ROOM AND BOUNDRY WALL AT GROUND FLOOR |
250000 |
UPGRADATION OF G.P.OFFICE ROOM AND BOUNDRY WALL AT GROUND FLOOR2 |
Completion of work |
-
latitude : 26.0704682
Longitude : 87.9278979
file name : Image_16032021151029621.png
|
2021-03-16 15:10:29.706391 |
37 |
39058510 |
Constriction of Drain and Cover with Soak Pit near Baldiabasa High School at Goharra |
250000 |
Constriction of Drain and Cover with Soak Pit near Baldiabasa High School at Goharra1 |
Completion of work |
-
latitude : 26.05946214403957,26.059449948370457
Longitude : 87.98042292706668,87.98044178634882
file name : Image_24112021141635251.png
|
2021-11-24 14:16:35.349665 |
38 |
39058472 |
Constriction of Community Toilet near Madrasa at Banbari |
250000 |
Constriction of Community Toilet near Madrasa at Banbari1 |
Completion of work |
-
latitude : 26.067480565980077
Longitude : 87.96675925143063
file name : Image_24022022173316850.png
|
2022-02-24 17:33:16.95973 |
39 |
39058415 |
Constriction of Community Toilet near Chapore ICDS Centre at Chapore |
250000 |
Constriction of Community Toilet near Chapore ICDS Centre at Chapore1 |
Completion of work |
-
latitude : 26.069878502748907
Longitude : 87.9253488779068
file name : Image_27122021170312654.png
|
2021-12-27 17:03:12.743794 |
40 |
39058415 |
Constriction of Community Toilet near Chapore ICDS Centre at Chapore |
250000 |
Constriction of Community Toilet near Chapore ICDS Centre at Chapore1 |
Completion of work |
-
latitude : 26.069889818318188
Longitude : 87.92519079521298
file name : Image_03112021165447864.png
|
2021-11-03 16:54:47.953858 |
41 |
39058423 |
Constriction of Community Toilet near Pir Majar Khanka at Malingoan |
250000 |
Constriction of Community Toilet near Pir Majar Khanka at Malingoan1 |
Completion of work |
-
latitude : 26.056904029101133
Longitude : 87.96675673685968
file name : Image_24022022173307058.png
|
2022-02-24 17:33:07.174005 |
42 |
39058430 |
Constriction of Community Toilet near Jama Masjid at Jharbari Malingoan |
250000 |
Constriction of Community Toilet near Jama Masjid at Jharbari Malingoan1 |
Completion of work |
-
latitude : 26.062246318906546
Longitude : 87.97166844829917
file name : Image_24022022173333204.png
|
2022-02-24 17:33:33.295649 |
43 |
39058492 |
Constriction of Community Toilet near Baro Masjid at Paschim Baldiabasa |
250000 |
Constriction of Community Toilet near Baro Masjid at Paschim Baldiabasa1 |
Completion of work |
-
latitude : 26.058385740034282
Longitude : 87.98934722319245
file name : Image_24022022173327312.png
|
2022-02-24 17:33:27.40738 |
44 |
35300952 |
CONSTRUCTION OF LADIES TOILET AT G.P. OFFICE |
300000 |
CONSTRUCTION OF LADIES TOILET AT G.P. OFFICE1 |
Completion of work |
-
latitude : 26.0704444
Longitude : 87.927861
file name : Image_26112021145736941.png
|
2021-11-26 14:57:37.086855 |
45 |
39058403 |
Constriction of Community Toilet near Wakte Masjid at Dumuria |
250000 |
Constriction of Community Toilet near Wakte Masjid at Dumuria1 |
Plinth level |
-
latitude : 26.042429823428392
Longitude : 87.94833574444056
file name : Image_16032021132431098.png
|
2021-03-16 13:24:31.216252 |
46 |
39058403 |
Constriction of Community Toilet near Wakte Masjid at Dumuria |
250000 |
Constriction of Community Toilet near Wakte Masjid at Dumuria1 |
Completion of work |
-
latitude : 26.04245291557163
Longitude : 87.94836499728262
file name : Image_16032021123329157.png
|
2021-03-16 12:33:29.257227 |
47 |
39058403 |
Constriction of Community Toilet near Wakte Masjid at Dumuria |
250000 |
Constriction of Community Toilet near Wakte Masjid at Dumuria1 |
Completion of work |
-
latitude : 26.04100733064115
Longitude : 87.94842685572803
file name : Image_06032021112504555.png
|
2021-03-06 11:25:04.65498 |
48 |
35296766 |
CONSTRUCTION OF DRAIN FROM CHARAN DAS HOUSE TO CHANNA PUKUR AT BHARNA |
290000 |
CONSTRUCTION OF DRAIN FROM CHARAN DAS HOUSE TO CHANNA PUKUR AT BHARNA1 |
Completion of work |
-
latitude : 26.029418176040053
Longitude : 87.91896052658558
file name : Image_16112021135715872.png
|
2021-11-16 13:57:15.990061 |
49 |
39058421 |
Constriction of Community Toilet near Juma Masjid at Ladhi |
250000 |
Constriction of Community Toilet near Juma Masjid at Ladhi1 |
Plinth level |
-
latitude : 26.050777067430317
Longitude : 87.96013318933547
file name : Image_12112021151854183.png
|
2021-11-12 15:18:54.287619 |
50 |
39058421 |
Constriction of Community Toilet near Juma Masjid at Ladhi |
250000 |
Constriction of Community Toilet near Juma Masjid at Ladhi1 |
Completion of work |
-
latitude : 26.050757453776896
Longitude : 87.9601726680994
file name : Image_28092021101200214.png
|
2021-09-28 10:12:00.320447 |
51 |
39058393 |
Constriction of Community Toilet near Ajabul House at Shirshi |
250000 |
Constriction of Community Toilet near Ajabul House at Shirshi1 |
Plinth level |
-
latitude : 26.040767692029476
Longitude : 87.93539701960981
file name : Image_30092021154209431.png
|
2021-09-30 15:42:09.542324 |
52 |
39058393 |
Constriction of Community Toilet near Ajabul House at Shirshi |
250000 |
Constriction of Community Toilet near Ajabul House at Shirshi1 |
Completion of work |
-
latitude : 26.040847110562027
Longitude : 87.93541638180614
file name : Image_30092021153116591.png
|
2021-09-30 15:31:16.69524 |
53 |
39058393 |
Constriction of Community Toilet near Ajabul House at Shirshi |
250000 |
Constriction of Community Toilet near Ajabul House at Shirshi1 |
Completion of work |
-
latitude : 26.040803524665534
Longitude : 87.93538629077375
file name : Image_05072021143246658.png
|
2021-07-05 14:32:46.780348 |
54 |
39058485 |
Constriction of Community Toilet near Juma Masjid Haji Tola at Purba Baldiabasa |
250000 |
Constriction of Community Toilet near Juma Masjid Haji Tola at Purba Baldiabasa1 |
Completion of work |
-
latitude : 26.05741440318525
Longitude : 87.99173036590219
file name : Image_25062021110032180.png
|
2021-06-25 11:00:32.26942 |
55 |
39057279 |
Installation of Mark-II Tube Well with Soak Pit near Kabarsthan at Binardaha |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Kabarsthan at Binardaha1 |
Completion of work |
-
latitude : 26.034225490875542
Longitude : 87.92997485026717
file name : Image_24062021153625697.png
|
2021-06-24 15:36:25.815621 |
56 |
39058240 |
Installation of Mark-II Tube Well with Soak Pit near Madrasa at Banbari |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Madrasa at Banbari1 |
Roof laid |
-
latitude : 26.067397920414805
Longitude : 87.96680124476552
file name : Image_24062021143049392.png
|
2021-06-24 14:30:49.503981 |
57 |
39058313 |
Installation of Mark-II Tube Well with Soak Pit near Masjid Dakshin Basti at Goharra |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Masjid Dakshin Basti at Goharra1 |
Completion of work |
-
latitude : 26.05914182960987
Longitude : 87.97990744002163
file name : Image_01042021170036362.png
|
2021-04-01 17:00:36.496589 |
58 |
39055273 |
Installation of Mark-II Tube Well with Soak Pit near United Public School at Barodhia |
120000 |
Installation of Mark-II Tube Well with Soak Pit near United Public School at Barodhia1 |
Plinth level |
-
latitude : 26.07067897450179
Longitude : 87.92774165980518
file name : Image_24032021121813048.png
|
2021-03-24 12:18:13.134271 |
59 |
39055273 |
Installation of Mark-II Tube Well with Soak Pit near United Public School at Barodhia |
120000 |
Installation of Mark-II Tube Well with Soak Pit near United Public School at Barodhia1 |
Completion of work |
-
latitude : 26.040764255449176
Longitude : 87.94624370522797
file name : Image_16032021161556092.png
|
2021-03-16 16:15:56.179943 |
60 |
39058185 |
Installation of Mark-II Tube Well with Soak Pit near Babul Rasid House at Jharbari Malingoan |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Babul Rasid House at Jharbari Malingoan1 |
Plinth level |
-
latitude : 26.051005935296416
Longitude : 87.9660064727068
file name : Image_24032021163448386.png
|
2021-03-24 16:34:48.50315 |
61 |
39058185 |
Installation of Mark-II Tube Well with Soak Pit near Babul Rasid House at Jharbari Malingoan |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Babul Rasid House at Jharbari Malingoan1 |
Plinth level |
-
latitude : 26.050963439047337
Longitude : 87.96604335308075
file name : Image_24032021163455427.png
|
2021-03-24 16:34:55.51706 |
62 |
39058185 |
Installation of Mark-II Tube Well with Soak Pit near Babul Rasid House at Jharbari Malingoan |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Babul Rasid House at Jharbari Malingoan1 |
Plinth level |
-
latitude : 26.050963439047337
Longitude : 87.96604335308075
file name : Image_24032021163505430.png
|
2021-03-24 16:35:05.528969 |
63 |
39058185 |
Installation of Mark-II Tube Well with Soak Pit near Babul Rasid House at Jharbari Malingoan |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Babul Rasid House at Jharbari Malingoan1 |
Completion of work |
-
latitude : 26.053484338335693
Longitude : 87.96774873510003
file name : Image_06032021135201721.png
|
2021-03-06 13:52:01.828514 |
64 |
39058200 |
Installation of Mark-II Tube Well with Soak Pit near Juma Masjid at Patwa |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Juma Masjid at Patwa1 |
Completion of work |
-
latitude : 26.068913494236767
Longitude : 87.95794601552188
file name : Image_06032021125755115.png
|
2021-03-06 12:57:55.217773 |
65 |
39058219 |
Installation of Mark-II Tube Well with Soak Pit near Tamijuddin House at Patwa |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Tamijuddin House at Patwa1 |
Plinth level |
-
latitude : 26.068956535309553
Longitude : 87.95792330056429
file name : Image_08042021161754597.png
|
2021-04-08 16:17:54.686572 |
66 |
39058232 |
Installation of Mark-II Tube Well with Soak Pit near Iyasin House at Banbari |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Iyasin House at Banbari1 |
Plinth level |
-
latitude : 26.06680548749864
Longitude : 87.9705445189029
file name : Image_24062021151036860.png
|
2021-06-24 15:10:36.967107 |
67 |
39058232 |
Installation of Mark-II Tube Well with Soak Pit near Iyasin House at Banbari |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Iyasin House at Banbari1 |
Plinth level |
-
latitude : 26.066733403131366
Longitude : 87.97042993828654
file name : Image_24032021163951298.png
|
2021-03-24 16:39:51.397727 |
68 |
39058232 |
Installation of Mark-II Tube Well with Soak Pit near Iyasin House at Banbari |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Iyasin House at Banbari1 |
Completion of work |
-
latitude : 26.066759596578777
Longitude : 87.97057419084013
file name : Image_17032021131804819.png
|
2021-03-17 13:18:04.918045 |
69 |
39058253 |
Installation of Mark-II Tube Well with Soak Pit near Juma Masjid Idgah Tola at Purba Baldiabasa |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Juma Masjid Idgah Tola at Purba Baldiabasa1 |
Plinth level |
-
latitude : 26.06166733894497
Longitude : 87.98850115388632
file name : Image_25062021110822238.png
|
2021-06-25 11:08:22.325325 |
70 |
39058261 |
Installation of Mark-II Tube Well with Soak Pit near Juma Masjid Colony at Paschim Baldiabasa |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Juma Masjid Colony at Paschim Baldiabasa1 |
Plinth level |
-
latitude : 26.058406946249306
Longitude : 87.98940111882985
file name : Image_25062021110506589.png
|
2021-06-25 11:05:06.677061 |
71 |
39058270 |
Installation of Mark-II Tube Well with Soak Pit near Juma Masjid at Paschim Baldiabasa |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Juma Masjid at Paschim Baldiabasa1 |
Plinth level |
-
latitude : 26.0649641091004
Longitude : 87.99398107454181
file name : Image_25062021105548294.png
|
2021-06-25 10:55:48.414892 |
72 |
39057204 |
Installation of Mark-II Tube Well with Soak Pit near Shirshi Colony Chowk at Dehgoan |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Shirshi Colony Chowk at Dehgoan1 |
Completion of work |
-
latitude : 26.07045962009579
Longitude : 87.9279322642833
file name : Image_24062021153351216.png
|
2021-06-24 15:33:51.355241 |
73 |
39057440 |
Installation of Mark-II Tube Well with Soak Pit near Siromoni Kali Mandir at Bharna |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Siromoni Kali Mandir at Bharna1 |
Completion of work |
-
latitude : 26.028407108969986
Longitude : 87.91575076058507
file name : Image_10042021160204085.png
|
2021-04-10 16:02:04.160683 |
74 |
39057363 |
Installation of Mark-II Tube Well with Soak Pit near Hari Pada House at Bharna |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Hari Pada House at Bharna1 |
Completion of work |
-
latitude : 26.030431338585913
Longitude : 87.91739587672055
file name : Image_10042021160211537.png
|
2021-04-10 16:02:11.610382 |
75 |
39055296 |
Installation of Mark-II Tube Well with Soak Pit near Harijon Tola at Barodhia |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Harijon Tola at Barodhia1 |
Plinth level |
-
latitude : 26.069945013150573
Longitude : 87.90535435080528
file name : Image_24032021122241664.png
|
2021-03-24 12:22:41.768848 |
76 |
39055296 |
Installation of Mark-II Tube Well with Soak Pit near Harijon Tola at Barodhia |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Harijon Tola at Barodhia1 |
Completion of work |
-
latitude : 26.070078285411
Longitude : 87.91171755641699
file name : Image_16032021162400922.png
|
2021-03-16 16:24:01.008317 |
77 |
39055296 |
Installation of Mark-II Tube Well with Soak Pit near Harijon Tola at Barodhia |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Harijon Tola at Barodhia1 |
Completion of work |
-
latitude : 26.070135324262083
Longitude : 87.91171445511281
file name : Image_15032021115233206.png
|
2021-03-15 11:52:33.315931 |
78 |
39057875 |
Installation of Mark-II Tube Well with Soak Pit near Lagma Kali Mandir at Bharna |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Lagma Kali Mandir at Bharna1 |
Completion of work |
-
latitude : 26.07009
Longitude : 87.9277541
file name : Image_30122021142106749.png
|
2021-12-30 14:21:06.854104 |
79 |
39058111 |
Installation of Mark-II Tube Well with Soak Pit near Poresh House at Kanjia |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Poresh House at Kanjia1 |
Completion of work |
-
latitude : 26.07009
Longitude : 87.9277541
file name : Image_30122021142102624.png
|
2021-12-30 14:21:02.724462 |
80 |
39058111 |
Installation of Mark-II Tube Well with Soak Pit near Poresh House at Kanjia |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Poresh House at Kanjia1 |
Completion of work |
-
latitude : 26.07009
Longitude : 87.9277541
file name : Image_30122021142044734.png
|
2021-12-30 14:20:44.844618 |
81 |
39056406 |
Installation of Mark-II Tube Well with Soak Pit near Rampur Kabarsthan at Rampur |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Rampur Kabarsthan at Rampur1 |
Completion of work |
-
latitude : 26.074133114889264
Longitude : 87.9263367690146
file name : Image_30092021115546056.png
|
2021-09-30 11:55:46.177679 |
82 |
39058137 |
Installation of Mark-II Tube Well with Soak Pit near Chapore Madrasa at Chapore |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Chapore Madrasa at Chapore1 |
Plinth level |
-
latitude : 26.06773893814534
Longitude : 87.92577442713082
file name : Image_02102021134427266.png
|
2021-10-02 13:44:27.376507 |
83 |
39058137 |
Installation of Mark-II Tube Well with Soak Pit near Chapore Madrasa at Chapore |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Chapore Madrasa at Chapore1 |
Completion of work |
-
latitude : 26.06770888902247
Longitude : 87.92573880404234
file name : Image_27092021104923843.png
|
2021-09-27 10:49:23.956607 |
84 |
35293782 |
INSTALLATION OF PURIFYING WATER AT G.P. OFFICE |
100000 |
INSTALLATION OF PURIFYING WATER AT G.P. OFFICE1 |
Plinth level |
-
latitude : 26.0703938
Longitude : 87.9278424
file name : Image_07012022154319913.png
|
2022-01-07 15:43:20.018155 |
85 |
35293782 |
INSTALLATION OF PURIFYING WATER AT G.P. OFFICE |
100000 |
INSTALLATION OF PURIFYING WATER AT G.P. OFFICE1 |
Completion of work |
-
latitude : 26.0703807
Longitude : 87.9278281
file name : Image_07012022151202405.png
|
2022-01-07 15:12:02.488429 |
86 |
35318817 |
MARK-II TUBE WELL REPAIRING OF ALL SANSAD UNDER BELAN G.P |
50000 |
MARK-II TUBE WELL REPAIRING OF ALL SANSAD UNDER BELAN G.P1 |
Plinth level |
-
latitude : 26.077218619175255
Longitude : 87.92887539602816
file name : Image_30092021115541497.png
|
2021-09-30 11:55:41.625842 |
87 |
35318817 |
MARK-II TUBE WELL REPAIRING OF ALL SANSAD UNDER BELAN G.P |
50000 |
MARK-II TUBE WELL REPAIRING OF ALL SANSAD UNDER BELAN G.P1 |
Completion of work |
-
latitude : 26.07723052147776
Longitude : 87.9288784135133
file name : Image_29092021130234894.png
|
2021-09-29 13:02:34.980962 |
88 |
39058249 |
Installation of Mark-II Tube Well with Soak Pit near Juma Masjid Mistry Para at Purba Baldiabasa |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Juma Masjid Mistry Para at Purba Baldiabasa1 |
Completion of work |
-
latitude : 26.0234831
Longitude : 87.9605779
file name : Image_12022022123233264.png
|
2022-02-12 12:32:33.408044 |
89 |
39058133 |
Installation of Mark-II Tube Well with Soak Pit near Nice Public School at Chapore |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Nice Public School at Chapore1 |
Plinth level |
-
latitude : 26.06828468386084
Longitude : 87.9212683159858
file name : Image_02102021134054792.png
|
2021-10-02 13:40:54.894709 |
90 |
39058133 |
Installation of Mark-II Tube Well with Soak Pit near Nice Public School at Chapore |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Nice Public School at Chapore1 |
Completion of work |
-
latitude : 26.06822152622044
Longitude : 87.92125708423555
file name : Image_27092021104530500.png
|
2021-09-27 10:45:30.648764 |
91 |
39058125 |
Installation of Mark-II Tube Well with Soak Pit near Bijulia More at Dumuria |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Bijulia More at Dumuria1 |
Completion of work |
-
latitude : 26.045312569476664
Longitude : 87.94283444993198
file name : Image_27092021121400694.png
|
2021-09-27 12:14:00.79759 |
92 |
39058104 |
Installation of Mark-II Tube Well with Soak Pit near Dulal More at Kanjia |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Dulal More at Kanjia1 |
Plinth level |
-
latitude : 26.033578659407794
Longitude : 87.91526854969561
file name : Image_02102021111212439.png
|
2021-10-02 11:12:12.519191 |
93 |
39058104 |
Installation of Mark-II Tube Well with Soak Pit near Dulal More at Kanjia |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Dulal More at Kanjia1 |
Completion of work |
-
latitude : 26.033645546995103
Longitude : 87.91526100598276
file name : Image_28092021093311235.png
|
2021-09-28 09:33:11.362079 |
94 |
39058033 |
Installation of Mark-II Tube Well with Soak Pit near Mustafa House at Bijulia |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Mustafa House at Bijulia1 |
Completion of work |
-
latitude : 26.0424544243142
Longitude : 87.93969802558422
file name : Image_27092021121911793.png
|
2021-09-27 12:19:11.907486 |
95 |
39058094 |
Installation of Mark-II Tube Well with Soak Pit near Tauf House at Shirshi |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Tauf House at Shirshi1 |
Completion of work |
-
latitude : 26.039053425192833
Longitude : 87.93528051115572
file name : Image_27092021122415898.png
|
2021-09-27 12:24:16.00168 |
96 |
39058099 |
Installation of Mark-II Tube Well with Soak Pit near FP School at Kanjia |
120000 |
Installation of Mark-II Tube Well with Soak Pit near FP School at Kanjia1 |
Plinth level |
-
latitude : 26.04464172385633
Longitude : 87.91147875599563
file name : Image_02102021112143618.png
|
2021-10-02 11:21:43.700487 |
97 |
39058099 |
Installation of Mark-II Tube Well with Soak Pit near FP School at Kanjia |
120000 |
Installation of Mark-II Tube Well with Soak Pit near FP School at Kanjia1 |
Completion of work |
-
latitude : 26.04469960089773
Longitude : 87.91148680262268
file name : Image_28092021092105303.png
|
2021-09-28 09:21:05.41846 |
98 |
39058167 |
Installation of Mark-II Tube Well with Soak Pit near Asgar House at Malingoan |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Asgar House at Malingoan1 |
Roof laid |
-
latitude : 26.05334037914872
Longitude : 87.96777094714344
file name : Image_24032021161611403.png
|
2021-03-24 16:16:11.5094 |
99 |
39058119 |
Installation of Mark-II Tube Well with Soak Pit near Paschim Kabarsthan at Dumuria |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Paschim Kabarsthan at Dumuria1 |
Completion of work |
-
latitude : 26.040208409540355
Longitude : 87.9426383972168
file name : Image_14072021112131375.png
|
2021-07-14 11:21:31.478558 |
100 |
39058119 |
Installation of Mark-II Tube Well with Soak Pit near Paschim Kabarsthan at Dumuria |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Paschim Kabarsthan at Dumuria1 |
Completion of work |
-
latitude : 26.040176851674914
Longitude : 87.94263663701713
file name : Image_13072021130803230.png
|
2021-07-13 13:08:03.370906 |
101 |
39058325 |
Installation of Mark-II Tube Well with Soak Pit near Kali Mandir at Goharra |
120000 |
Installation of Mark-II Tube Well with Soak Pit near Kali Mandir at Goharra1 |
Plinth level |
-
latitude : 26.06651979032904
Longitude : 87.98430249094963
file name : Image_24032021164836598.png
|
2021-03-24 16:48:36.728379 |
102 |
35284846 |
CONSTRUCTION OF SEATING SYSTEM WITH SHADE FOR STUDENT OF MID-DAY MEAL AT KANJIA F.P.SCHOOL |
248860 |
CONSTRUCTION OF SEATING SYSTEM WITH SHADE FOR STUDENT OF MID-DAY MEAL AT KANJIA F.P.SCHOOL1 |
Plinth level |
-
latitude : 26.04183533694595
Longitude : 87.91454250924289
file name : Image_21042022153053503.png
|
2022-04-21 15:30:53.621979 |
103 |
35284846 |
CONSTRUCTION OF SEATING SYSTEM WITH SHADE FOR STUDENT OF MID-DAY MEAL AT KANJIA F.P.SCHOOL |
248860 |
CONSTRUCTION OF SEATING SYSTEM WITH SHADE FOR STUDENT OF MID-DAY MEAL AT KANJIA F.P.SCHOOL1 |
Completion of work |
-
latitude : 26.04186165612191
Longitude : 87.91432441212237
file name : Image_21042022152023640.png
|
2022-04-21 15:20:23.74965 |
104 |
35295334 |
CONSTRUCTION OF WATER PLAN AT DULAL PAUL HOUSE |
290000 |
CONSTRUCTION OF WATER PLAN AT DULAL PAUL HOUSE1 |
Completion of work |
-
latitude : 26.04306592606008
Longitude : 87.91212793439627
file name : Image_24062021164859684.png
|
2021-06-24 16:48:59.79829 |
105 |
35302309 |
CONSTRUCTION OF DRAIN FROM ASAMUDDIN LAND TO NAIMUL LAND VIA MAMA BHAGNA ROAD AT CHAPORE |
268860 |
CONSTRUCTION OF DRAIN FROM ASAMUDDIN LAND TO NAIMUL LAND VIA MAMA BHAGNA ROAD AT CHAPORE1 |
Completion of work |
-
latitude : 26.06919805984944,26.067202538251877,26.068607554771006
Longitude : 87.92610626667738,87.92563964612782,87.92595438659191
file name : Image_23032021152705621.png
|
2021-03-23 15:27:05.724108 |
106 |
35116892 |
CONSTRUCTION OF PCC ROAD FROM AHAMAD HOUSE TO JANAVDHAN RAM HOUSE AT BARODIA |
240000 |
CONSTRUCTION OF PCC ROAD FROM AHAMAD HOUSE TO JANAVDHAN RAM HOUSE AT BARODIA1 |
Plinth level |
-
latitude : 26.06877464801073,26.068864376284182
Longitude : 87.93170252814889,87.93101076968014
file name : Image_04032021150438758.png
|
2021-03-04 15:04:38.856111 |
107 |
35116892 |
CONSTRUCTION OF PCC ROAD FROM AHAMAD HOUSE TO JANAVDHAN RAM HOUSE AT BARODIA |
240000 |
CONSTRUCTION OF PCC ROAD FROM AHAMAD HOUSE TO JANAVDHAN RAM HOUSE AT BARODIA1 |
Completion of work |
-
latitude : 26.0647238,26.06512629892677
Longitude : 87.9104426,87.90761528536677
file name : Image_10022021140351787.png
|
2021-02-10 14:03:51.877262 |
108 |
35116892 |
CONSTRUCTION OF PCC ROAD FROM AHAMAD HOUSE TO JANAVDHAN RAM HOUSE AT BARODIA |
240000 |
CONSTRUCTION OF PCC ROAD FROM AHAMAD HOUSE TO JANAVDHAN RAM HOUSE AT BARODIA1 |
Plinth level |
-
latitude : 26.065203119069338,26.06552858836949
Longitude : 87.90768493898213,87.90773632004857
file name : Image_16022021114537175.png
|
2021-02-16 11:45:37.306742 |
109 |
35103559 |
CONSTRUCTION OF PCC ROAD FROM KABRASTHAN TO FP SCHOOL AT BANBARI |
250000 |
CONSTRUCTION OF PCC ROAD FROM KABRASTHAN TO FP SCHOOL AT BANBARI1 |
Plinth level |
-
latitude : 26.069832863286138,26.069838982075453
Longitude : 87.96520457603037,87.96516585163772
file name : Image_12072021121226469.png
|
2021-07-12 12:12:26.583739 |
110 |
35103559 |
CONSTRUCTION OF PCC ROAD FROM KABRASTHAN TO FP SCHOOL AT BANBARI |
250000 |
CONSTRUCTION OF PCC ROAD FROM KABRASTHAN TO FP SCHOOL AT BANBARI1 |
Completion of work |
-
latitude : 26.070016217418015,26.070514312013984
Longitude : 87.96588627621531,87.96629539690912
file name : Image_02032021133424466.png
|
2021-03-02 13:34:24.577215 |
111 |
35166896 |
CONSTRUCTION OF PCC ROAD FROM SHIBLI HOUSE TO PMGSY ROAD AT MALINGAON |
250000 |
CONSTRUCTION OF PCC ROAD FROM SHIBLI HOUSE TO PMGSY ROAD AT MALINGAON1 |
Plinth level |
-
latitude : 26.050968803465366,26.050973371602595
Longitude : 87.96608953736722,87.9661148507148
file name : Image_24032021163458705.png
|
2021-03-24 16:34:58.815833 |
112 |
35166896 |
CONSTRUCTION OF PCC ROAD FROM SHIBLI HOUSE TO PMGSY ROAD AT MALINGAON |
250000 |
CONSTRUCTION OF PCC ROAD FROM SHIBLI HOUSE TO PMGSY ROAD AT MALINGAON1 |
Plinth level |
-
latitude : 26.050968803465366,26.050973371602595
Longitude : 87.96608953736722,87.9661148507148
file name : Image_24032021163508666.png
|
2021-03-24 16:35:08.782196 |
113 |
35161777 |
CONSTRUCTION OF PCC ROAD FROM KALI MANDIR TO DINESH HOUSE AT GOHARRAH |
250000 |
CONSTRUCTION OF PCC ROAD FROM KALI MANDIR TO DINESH HOUSE AT GOHARRAH1 |
Plinth level |
-
latitude : 26.066545816138387,26.06653433293104
Longitude : 87.98487086780369,87.98487002961338
file name : Image_25062021112325240.png
|
2021-06-25 11:23:25.338716 |
114 |
35161777 |
CONSTRUCTION OF PCC ROAD FROM KALI MANDIR TO DINESH HOUSE AT GOHARRAH |
250000 |
CONSTRUCTION OF PCC ROAD FROM KALI MANDIR TO DINESH HOUSE AT GOHARRAH1 |
Plinth level |
-
latitude : 26.066545816138387,26.06653433293104
Longitude : 87.98487086780369,87.98487002961338
file name : Image_30062021155139583.png
|
2021-06-30 15:51:39.733052 |
115 |
35161777 |
CONSTRUCTION OF PCC ROAD FROM KALI MANDIR TO DINESH HOUSE AT GOHARRAH |
250000 |
CONSTRUCTION OF PCC ROAD FROM KALI MANDIR TO DINESH HOUSE AT GOHARRAH1 |
Plinth level |
-
latitude : 26.066600298509,26.066600298509
Longitude : 87.98498335294425,87.98498335294425
file name : Image_24032021165327772.png
|
2021-03-24 16:53:27.885908 |
116 |
35161777 |
CONSTRUCTION OF PCC ROAD FROM KALI MANDIR TO DINESH HOUSE AT GOHARRAH |
250000 |
CONSTRUCTION OF PCC ROAD FROM KALI MANDIR TO DINESH HOUSE AT GOHARRAH1 |
Plinth level |
-
latitude : 26.066646524704993,26.0664528189227
Longitude : 87.98489936627448,87.98530337400734
file name : Image_17032021135033371.png
|
2021-03-17 13:50:33.487608 |
117 |
35161777 |
CONSTRUCTION OF PCC ROAD FROM KALI MANDIR TO DINESH HOUSE AT GOHARRAH |
250000 |
CONSTRUCTION OF PCC ROAD FROM KALI MANDIR TO DINESH HOUSE AT GOHARRAH1 |
Plinth level |
-
latitude : 26.066630096174777,26.066612116992474
Longitude : 87.98492996022105,87.98495032824576
file name : Image_17032021135409561.png
|
2021-03-17 13:54:09.679626 |
118 |
35161777 |
CONSTRUCTION OF PCC ROAD FROM KALI MANDIR TO DINESH HOUSE AT GOHARRAH |
250000 |
CONSTRUCTION OF PCC ROAD FROM KALI MANDIR TO DINESH HOUSE AT GOHARRAH1 |
Completion of work |
-
latitude : 26.066607967950404,26.06658039148897,26.066580642946064
Longitude : 87.984813535586,87.98474865965545,87.98474865965545
file name : Image_04022021112603869.png
|
2021-02-04 11:26:03.965473 |
119 |
35118284 |
CONSTRUCTION OF PCC ROAD FROM CHANDU DAS HOUSE TO SIROMONI BATGACHH AT BHARNA |
250000 |
CONSTRUCTION OF PCC ROAD FROM CHANDU DAS HOUSE TO SIROMONI BATGACHH AT BHARNA1 |
Roof laid |
-
latitude : 26.029528356157243,26.029852693900466
Longitude : 87.91556023992598,87.91554607450962
file name : Image_10042021160207470.png
|
2021-04-10 16:02:07.539785 |
120 |
35118284 |
CONSTRUCTION OF PCC ROAD FROM CHANDU DAS HOUSE TO SIROMONI BATGACHH AT BHARNA |
250000 |
CONSTRUCTION OF PCC ROAD FROM CHANDU DAS HOUSE TO SIROMONI BATGACHH AT BHARNA1 |
Plinth level |
-
latitude : 26.030015889555216,26.029461259022355
Longitude : 87.91553475894034,87.91560030542314
file name : Image_15022021112735784.png
|
2021-02-15 11:27:35.877187 |
121 |
35118284 |
CONSTRUCTION OF PCC ROAD FROM CHANDU DAS HOUSE TO SIROMONI BATGACHH AT BHARNA |
250000 |
CONSTRUCTION OF PCC ROAD FROM CHANDU DAS HOUSE TO SIROMONI BATGACHH AT BHARNA1 |
Completion of work |
-
latitude : 26.029899548739195,26.029708315618336
Longitude : 87.91549980640411,87.91555705480278
file name : Image_09022021123437368.png
|
2021-02-09 12:34:37.48303 |
122 |
35171741 |
CONSTRUCTION OF PCC ROAD FROM ABDUR RASHID HOUSE TO AZAD ALI HOUSE AT SHIRSI |
250000 |
CONSTRUCTION OF PCC ROAD FROM ABDUR RASHID HOUSE TO AZAD ALI HOUSE AT SHIRSI1 |
Plinth level |
-
latitude : 26.042221910320222,26.04166983626783
Longitude : 87.93600018136203,87.93582508340478
file name : Image_13022021132129987.png
|
2021-02-13 13:21:30.094643 |
123 |
35171741 |
CONSTRUCTION OF PCC ROAD FROM ABDUR RASHID HOUSE TO AZAD ALI HOUSE AT SHIRSI |
250000 |
CONSTRUCTION OF PCC ROAD FROM ABDUR RASHID HOUSE TO AZAD ALI HOUSE AT SHIRSI1 |
Completion of work |
-
latitude : 26.04180935304612,26.042133984155953
Longitude : 87.93592692352831,87.93594293296337
file name : Image_09022021125709661.png
|
2021-02-09 12:57:09.767621 |
124 |
35163628 |
CONSTRUCTION OF PCC ROAD FROM ASIMUDDIN LAND TO PMGSY ROAD ABID HOUSE AT JHARBARI MALINGAON |
250000 |
CONSTRUCTION OF PCC ROAD FROM ASIMUDDIN LAND TO PMGSY ROAD ABID HOUSE AT JHARBARI MALINGAON1 |
Completion of work |
-
latitude : 26.058459458872676,26.058459458872676
Longitude : 87.97389124520123,87.97389124520123
file name : Image_01042021170057564.png
|
2021-04-01 17:00:57.660733 |
125 |
35163628 |
CONSTRUCTION OF PCC ROAD FROM ASIMUDDIN LAND TO PMGSY ROAD ABID HOUSE AT JHARBARI MALINGAON |
250000 |
CONSTRUCTION OF PCC ROAD FROM ASIMUDDIN LAND TO PMGSY ROAD ABID HOUSE AT JHARBARI MALINGAON1 |
Completion of work |
-
latitude : 26.058459458872676,26.058459458872676
Longitude : 87.97389124520123,87.97389124520123
file name : Image_01042021170113678.png
|
2021-04-01 17:01:13.7704 |
126 |
35163628 |
CONSTRUCTION OF PCC ROAD FROM ASIMUDDIN LAND TO PMGSY ROAD ABID HOUSE AT JHARBARI MALINGAON |
250000 |
CONSTRUCTION OF PCC ROAD FROM ASIMUDDIN LAND TO PMGSY ROAD ABID HOUSE AT JHARBARI MALINGAON1 |
Completion of work |
-
latitude : 26.061105877161026,26.061083623208106
Longitude : 87.96579466201365,87.96578644774854
file name : Image_17032021151732461.png
|
2021-03-17 15:17:32.578371 |
127 |
35163628 |
CONSTRUCTION OF PCC ROAD FROM ASIMUDDIN LAND TO PMGSY ROAD ABID HOUSE AT JHARBARI MALINGAON |
250000 |
CONSTRUCTION OF PCC ROAD FROM ASIMUDDIN LAND TO PMGSY ROAD ABID HOUSE AT JHARBARI MALINGAON1 |
Completion of work |
-
latitude : 26.050891438499093,26.050922912545502
Longitude : 87.96613262034953,87.96607989817858
file name : Image_16032021100324667.png
|
2021-03-16 10:03:24.757296 |
128 |
35119997 |
CONSTRUCTION OF PCC ROAD FROM ILYASH HOUSE TO SANAULLAH LAND AT CHAPORE |
250000 |
CONSTRUCTION OF PCC ROAD FROM ILYASH HOUSE TO SANAULLAH LAND AT CHAPORE1 |
Completion of work |
-
latitude : 26.068850294686854,26.068850294686854
Longitude : 87.93173119425774,87.93173119425774
file name : Image_27012021160723563.png
|
2021-01-27 16:07:23.65183 |
129 |
35119170 |
CONSTRUCTION OF PCC ROAD FROM PARWEZ HOUSE TO NOOR ISLAM AT BINARDAH |
250000 |
CONSTRUCTION OF PCC ROAD FROM PARWEZ HOUSE TO NOOR ISLAM AT BINARDAH1 |
Plinth level |
-
latitude : 26.02100454736501,26.02098694536835,26.02099373470992
Longitude : 87.92812647297978,87.92820543050766,87.92836653068662
file name : Image_04072021115123704.png
|
2021-07-04 11:51:23.812716 |
130 |
35119170 |
CONSTRUCTION OF PCC ROAD FROM PARWEZ HOUSE TO NOOR ISLAM AT BINARDAH |
250000 |
CONSTRUCTION OF PCC ROAD FROM PARWEZ HOUSE TO NOOR ISLAM AT BINARDAH1 |
Completion of work |
-
latitude : 26.02096448186785,26.02101850323379
Longitude : 87.92814902029932,87.92812437750399
file name : Image_04072021112224847.png
|
2021-07-04 11:22:24.936694 |
131 |
35119170 |
CONSTRUCTION OF PCC ROAD FROM PARWEZ HOUSE TO NOOR ISLAM AT BINARDAH |
250000 |
CONSTRUCTION OF PCC ROAD FROM PARWEZ HOUSE TO NOOR ISLAM AT BINARDAH1 |
Completion of work |
-
latitude : 26.020986861549318,26.02092743385583
Longitude : 87.92809814214706,87.92853341437876
file name : Image_09022021113916550.png
|
2021-02-09 11:39:16.677437 |
132 |
35090204 |
CONSTRUCTION PCC ROAD FROM BASANTU HOUSE TO BINOD HOUSE AT LADHI |
250000 |
CONSTRUCTION PCC ROAD FROM BASANTU HOUSE TO BINOD HOUSE AT LADHI1 |
Completion of work |
-
latitude : 26.07009,26.07009
Longitude : 87.9277541,87.9277541
file name : Image_30122021142058209.png
|
2021-12-30 14:20:58.314079 |
133 |
35170158 |
CONSTRUCTION OF PCC ROAD FROM BHULA HOUSE TO BHILU MD HOUSE AT PATWA |
250000 |
CONSTRUCTION OF PCC ROAD FROM BHULA HOUSE TO BHILU MD HOUSE AT PATWA1 |
Completion of work |
-
latitude : 26.059545543976128,26.05957953259349
Longitude : 87.95664095319808,87.95663399621844
file name : Image_08112021134512782.png
|
2021-11-08 13:45:12.883739 |
134 |
35273054 |
CONSTRUCTION OF PCC ROAD FROM FOJU HOUSE TO ISTAB HOUSE AT CHAPORE |
300000 |
CONSTRUCTION OF PCC ROAD FROM FOJU HOUSE TO ISTAB HOUSE AT CHAPORE1 |
Completion of work |
-
latitude : 26.068910895846784,26.06891730800271
Longitude : 87.93171099387109,87.9317223932594
file name : Image_03112021170740524.png
|
2021-11-03 17:07:40.595064 |
135 |
35084356 |
CONSTRUCTION PCC ROAD FROM GOPAL SARKAR TO SANJAY KHAN HOUSE AT KANJIA |
250000 |
CONSTRUCTION PCC ROAD FROM GOPAL SARKAR TO SANJAY KHAN HOUSE AT KANJIA1 |
Plinth level |
-
latitude : 26.041473574005067,26.041477639228106
Longitude : 87.9142415151,87.91416859254241
file name : Image_09122021125417107.png
|
2021-12-09 12:54:17.213523 |
136 |
35084356 |
CONSTRUCTION PCC ROAD FROM GOPAL SARKAR TO SANJAY KHAN HOUSE AT KANJIA |
250000 |
CONSTRUCTION PCC ROAD FROM GOPAL SARKAR TO SANJAY KHAN HOUSE AT KANJIA1 |
Completion of work |
-
latitude : 26.041489667259157,26.04149733670056
Longitude : 87.91409256868064,87.91411595419049
file name : Image_18112021115616718.png
|
2021-11-18 11:56:16.856252 |
137 |
35283650 |
CONSTRUCTION OF PCC ROAD FROM MATIN HOUSE TO AJHAR HOUSE AT FULBASA |
300000 |
CONSTRUCTION OF PCC ROAD FROM MATIN HOUSE TO AJHAR HOUSE AT FULBASA1 |
Plinth level |
-
latitude : 26.0452114418149,26.045543323270977
Longitude : 87.94600691646338,87.9460865445435
file name : Image_09122021130349213.png
|
2021-12-09 13:03:49.293548 |
138 |
35046570 |
CONSTRUCTION OF PCC ROAD FROM KURBAN HOUSE TO HAIDAR HOUSE PASCHIMTOLA AT TALBARI KAMARSAL |
385040 |
CONSTRUCTION OF PCC ROAD FROM KURBAN HOUSE TO HAIDAR HOUSE PASCHIMTOLA AT TALBARI KAMARSAL1 |
Completion of work |
-
latitude : 26.0548594314605,26.054821629077196
Longitude : 87.91025734506547,87.91024116799235
file name : Image_29112021151040821.png
|
2021-11-29 15:10:40.971026 |
139 |
35046570 |
CONSTRUCTION OF PCC ROAD FROM KURBAN HOUSE TO HAIDAR HOUSE PASCHIMTOLA AT TALBARI KAMARSAL |
385040 |
CONSTRUCTION OF PCC ROAD FROM KURBAN HOUSE TO HAIDAR HOUSE PASCHIMTOLA AT TALBARI KAMARSAL1 |
Completion of work |
-
latitude : 26.055173291824758,26.055112397298217
Longitude : 87.91024628095329,87.91024183854461
file name : Image_16112021115044376.png
|
2021-11-16 11:50:44.496617 |
140 |
35092149 |
CONSTRUCTION OF PCC ROAD FROM CHANGMARA TO ILFAJ HOUSE AT PURBO BALDIABASA |
250000 |
CONSTRUCTION OF PCC ROAD FROM CHANGMARA TO ILFAJ HOUSE AT PURBO BALDIABASA1 |
Plinth level |
-
latitude : 26.0661280201748,26.06616586446762
Longitude : 87.98689501360059,87.98676433973014
file name : Image_01042021170049371.png
|
2021-04-01 17:00:49.49001 |
141 |
35092149 |
CONSTRUCTION OF PCC ROAD FROM CHANGMARA TO ILFAJ HOUSE AT PURBO BALDIABASA |
250000 |
CONSTRUCTION OF PCC ROAD FROM CHANGMARA TO ILFAJ HOUSE AT PURBO BALDIABASA1 |
Plinth level |
-
latitude : 26.0661280201748,26.06616586446762
Longitude : 87.98689501360059,87.98676433973014
file name : Image_01042021170106063.png
|
2021-04-01 17:01:06.156021 |
142 |
35091086 |
CONSTRUCTION OF PCC ROAD FROM FARIJUDDIN HOUSE TO SANTU HOUSE AT PURBO BALDIABASA |
250000 |
CONSTRUCTION OF PCC ROAD FROM FARIJUDDIN HOUSE TO SANTU HOUSE AT PURBO BALDIABASA1 |
Completion of work |
-
latitude : 26.066141724586487,26.06613430660218
Longitude : 87.9869272839278,87.98692828975618
file name : Image_01042021170040606.png
|
2021-04-01 17:00:40.705766 |
143 |
35091086 |
CONSTRUCTION OF PCC ROAD FROM FARIJUDDIN HOUSE TO SANTU HOUSE AT PURBO BALDIABASA |
250000 |
CONSTRUCTION OF PCC ROAD FROM FARIJUDDIN HOUSE TO SANTU HOUSE AT PURBO BALDIABASA1 |
Completion of work |
-
latitude : 26.066166409291327,26.066098264418542
Longitude : 87.98691077157855,87.98688797280192
file name : Image_01042021170053914.png
|
2021-04-01 17:00:54.020646 |
144 |
35091086 |
CONSTRUCTION OF PCC ROAD FROM FARIJUDDIN HOUSE TO SANTU HOUSE AT PURBO BALDIABASA |
250000 |
CONSTRUCTION OF PCC ROAD FROM FARIJUDDIN HOUSE TO SANTU HOUSE AT PURBO BALDIABASA1 |
Completion of work |
-
latitude : 26.066141724586487,26.06613430660218
Longitude : 87.9869272839278,87.98692828975618
file name : Image_01042021170101911.png
|
2021-04-01 17:01:02.008329 |
145 |
35091086 |
CONSTRUCTION OF PCC ROAD FROM FARIJUDDIN HOUSE TO SANTU HOUSE AT PURBO BALDIABASA |
250000 |
CONSTRUCTION OF PCC ROAD FROM FARIJUDDIN HOUSE TO SANTU HOUSE AT PURBO BALDIABASA1 |
Completion of work |
-
latitude : 26.066166409291327,26.066098264418542
Longitude : 87.98691077157855,87.98688797280192
file name : Image_01042021170109738.png
|
2021-04-01 17:01:09.829 |
146 |
35101572 |
CONSTRUCTION OF PCC ROAD FROM MATIUR HOUSE TO MOKBUL HOUSE AT PASCHIM BALDIABASA |
250000 |
CONSTRUCTION OF PCC ROAD FROM MATIUR HOUSE TO MOKBUL HOUSE AT PASCHIM BALDIABASA1 |
Completion of work |
-
latitude : 26.06164470780641,26.06164986267686
Longitude : 87.98966389149427,87.98970429226756
file name : Image_24112021133745086.png
|
2021-11-24 13:37:45.195388 |
147 |
35119787 |
CONSTRUCTION OF PCC ROAD FROM KABARSTHAN MORE TO ISTAB HOUSE AT CHAPORE |
250000 |
CONSTRUCTION OF PCC ROAD FROM KABARSTHAN MORE TO ISTAB HOUSE AT CHAPORE1 |
Completion of work |
-
latitude : 26.069574700668454,26.069557894952595
Longitude : 87.93215875513852,87.93215389363468
file name : Image_29112021151047422.png
|
2021-11-29 15:10:47.566847 |
148 |
35119787 |
CONSTRUCTION OF PCC ROAD FROM KABARSTHAN MORE TO ISTAB HOUSE AT CHAPORE |
250000 |
CONSTRUCTION OF PCC ROAD FROM KABARSTHAN MORE TO ISTAB HOUSE AT CHAPORE1 |
Completion of work |
-
latitude : 26.069574700668454,26.069557894952595
Longitude : 87.93215875513852,87.93215389363468
file name : Image_29112021151054011.png
|
2021-11-29 15:10:54.114502 |
149 |
35173811 |
CONSTRUCTION OF PCC ROAD FROM SULTAN HOUSE TO JAKKAR HOUSE AT DUMRIA |
250000 |
CONSTRUCTION OF PCC ROAD FROM SULTAN HOUSE TO JAKKAR HOUSE AT DUMRIA1 |
Completion of work |
-
latitude : 26.0703442,26.0703442
Longitude : 87.9278004,87.9278004
file name : Image_27122021170315949.png
|
2021-12-27 17:03:16.051419 |
150 |
35101002 |
CONSTRUCTION OF PCC ROAD FROM BELAL HOUSE TO NOUSAD HOUSE AT PASCHIM BALDIABASA |
250000 |
CONSTRUCTION OF PCC ROAD FROM BELAL HOUSE TO NOUSAD HOUSE AT PASCHIM BALDIABASA1 |
Completion of work |
-
latitude : 26.064840434119105,26.064840643666685
Longitude : 87.99848039634526,87.99848006106913
file name : Image_24112021133751580.png
|
2021-11-24 13:37:51.693599 |
151 |
35101002 |
CONSTRUCTION OF PCC ROAD FROM BELAL HOUSE TO NOUSAD HOUSE AT PASCHIM BALDIABASA |
250000 |
CONSTRUCTION OF PCC ROAD FROM BELAL HOUSE TO NOUSAD HOUSE AT PASCHIM BALDIABASA1 |
Completion of work |
-
latitude : 26.064840434119105,26.064840643666685
Longitude : 87.99848039634526,87.99848006106913
file name : Image_24112021133758948.png
|
2021-11-24 13:37:59.052604 |
152 |
35170473 |
CONSTRUCTION OF PCC ROAD FROM LAL MD HOUSE TO ABDUL HAMID HOUSE AT PATWA |
240000 |
CONSTRUCTION OF PCC ROAD FROM LAL MD HOUSE TO ABDUL HAMID HOUSE AT PATWA1 |
Completion of work |
-
latitude : 26.0704207,26.0704207
Longitude : 87.9278525,87.9278525
file name : Image_08112021122830646.png
|
2021-11-08 12:28:30.75935 |
153 |
35171156 |
CONSTRUCTION OF PCC ROAD FROM ILIYAS HOUSE TO AJHAR HOUSE AT SHIRSI |
250000 |
CONSTRUCTION OF PCC ROAD FROM ILIYAS HOUSE TO AJHAR HOUSE AT SHIRSI1 |
Completion of work |
-
latitude : 26.042859060689807,26.04289971292019
Longitude : 87.9361103195697,87.93613504618406
file name : Image_01112021120628579.png
|
2021-11-01 12:06:28.666653 |
154 |
35118480 |
CONSTRUCTION OF PCC ROAD FROM KHOKA DAS HOUSE TO BHUIDHOR MORE AT BHARNA |
250000 |
CONSTRUCTION OF PCC ROAD FROM KHOKA DAS HOUSE TO BHUIDHOR MORE AT BHARNA1 |
Completion of work |
-
latitude : 26.0090364,26.0090364
Longitude : 87.8963257,87.8963257
file name : Image_16112021114806584.png
|
2021-11-16 11:48:06.709109 |
155 |
35162908 |
CONSTRUCTION OF PCC ROAD FROM OLIULLAH HOUSE TO JAMIL HOUSE AT GOHARRAH |
250000 |
CONSTRUCTION OF PCC ROAD FROM OLIULLAH HOUSE TO JAMIL HOUSE AT GOHARRAH1 |
Completion of work |
-
latitude : 26.05954240076244,26.059534940868616
Longitude : 87.97996611334383,87.97992127016187
file name : Image_24112021141002895.png
|
2021-11-24 14:10:02.987421 |
156 |
35162908 |
CONSTRUCTION OF PCC ROAD FROM OLIULLAH HOUSE TO JAMIL HOUSE AT GOHARRAH |
250000 |
CONSTRUCTION OF PCC ROAD FROM OLIULLAH HOUSE TO JAMIL HOUSE AT GOHARRAH1 |
Completion of work |
-
latitude : 26.059558033011854,26.059552375227213
Longitude : 87.97998698428273,87.97996804118156
file name : Image_08112021123118532.png
|
2021-11-08 12:31:18.6214 |
157 |
35164269 |
CONSTRUCTION OF PCC ROAD FROM ISLAM HOUSE TO JAMA MASJID VIA MAHATAB HOUSE AT PURBO MALINGAON |
250000 |
CONSTRUCTION OF PCC ROAD FROM ISLAM HOUSE TO JAMA MASJID VIA MAHATAB HOUSE AT PURBO MALINGAON1 |
Plinth level |
-
latitude : 26.053636176511645,26.053638816811144
Longitude : 87.9738655127585,87.9738443903625
file name : Image_12112021144044747.png
|
2021-11-12 14:40:44.884842 |
158 |
35164269 |
CONSTRUCTION OF PCC ROAD FROM ISLAM HOUSE TO JAMA MASJID VIA MAHATAB HOUSE AT PURBO MALINGAON |
250000 |
CONSTRUCTION OF PCC ROAD FROM ISLAM HOUSE TO JAMA MASJID VIA MAHATAB HOUSE AT PURBO MALINGAON1 |
Completion of work |
-
latitude : 26.053769700229168,26.053769700229168
Longitude : 87.97393860295415,87.97393860295415
file name : Image_12112021143146791.png
|
2021-11-12 14:31:46.921491 |
159 |
35164923 |
CONSTRUCTION OF PCC ROAD FROM MAHBUB BAITAK TO JAMA MASJID AT JHARBARI MALINGAON |
250000 |
CONSTRUCTION OF PCC ROAD FROM MAHBUB BAITAK TO JAMA MASJID AT JHARBARI MALINGAON1 |
Completion of work |
-
latitude : 25.986526678316295,26.061086053960025
Longitude : 87.88725656457245,87.96577546745539
file name : Image_22112021143644930.png
|
2021-11-22 14:36:45.036298 |
160 |
35102767 |
CONSTRUCTION OF PCC ROAD FROM ABU KALAM HOUSE TO JAMA MASJID AT BONBARI |
250000 |
CONSTRUCTION OF PCC ROAD FROM ABU KALAM HOUSE TO JAMA MASJID AT BONBARI1 |
Completion of work |
-
latitude : 26.069995681755245,26.06995859183371
Longitude : 87.96590572223067,87.96595844440162
file name : Image_23112021135744595.png
|
2021-11-23 13:57:44.727889 |
161 |
35120828 |
CONSTRUCTION OF PCC ROAD FROM ALIM HOUSE TO SALIM HOUSE AT DEHOGAON |
240000 |
CONSTRUCTION OF PCC ROAD FROM ALIM HOUSE TO SALIM HOUSE AT DEHOGAON1 |
Plinth level |
-
latitude : 26.047308049164712,26.047291536815464
Longitude : 87.93452152982354,87.93448749929667
file name : Image_06112021125401764.png
|
2021-11-06 12:54:01.876745 |
162 |
35120828 |
CONSTRUCTION OF PCC ROAD FROM ALIM HOUSE TO SALIM HOUSE AT DEHOGAON |
240000 |
CONSTRUCTION OF PCC ROAD FROM ALIM HOUSE TO SALIM HOUSE AT DEHOGAON1 |
Completion of work |
-
latitude : 26.047433065250516,26.047326824627817
Longitude : 87.93453980237246,87.93450862169266
file name : Image_06112021124427821.png
|
2021-11-06 12:44:27.952675 |
163 |
35122054 |
CONSTRUCTION OF PCC ROAD FROM SAIRU HOUSE TO DILIP HOUSE AT DIGHLI KAMARSAL |
250000 |
CONSTRUCTION OF PCC ROAD FROM SAIRU HOUSE TO DILIP HOUSE AT DIGHLI KAMARSAL1 |
Plinth level |
-
latitude : 26.05929106939584,26.059246016666293
Longitude : 87.92358633130789,87.92362472042441
file name : Image_25112021152602525.png
|
2021-11-25 15:26:02.626199 |
164 |
35122054 |
CONSTRUCTION OF PCC ROAD FROM SAIRU HOUSE TO DILIP HOUSE AT DIGHLI KAMARSAL |
250000 |
CONSTRUCTION OF PCC ROAD FROM SAIRU HOUSE TO DILIP HOUSE AT DIGHLI KAMARSAL1 |
Completion of work |
-
latitude : 26.059353724122047,26.059128125198185
Longitude : 87.92367710731924,87.92358540929854
file name : Image_25112021145422416.png
|
2021-11-25 14:54:22.566977 |
165 |
56373924 |
Repairing of mark-ii tubewell with platform soakpit and drainage in deffrent village under belan gp |
350000 |
Repairing of mark-ii tubewell with platform soakpit and drainage in deffrent village under belan gp1 |
Completion of work |
-
latitude : 26.0696113
Longitude : 87.9268923
file name : Image_03022022131822148.png
|
2022-02-03 13:18:22.234373 |
166 |
56373924 |
Repairing of mark-ii tubewell with platform soakpit and drainage in deffrent village under belan gp |
350000 |
Repairing of mark-ii tubewell with platform soakpit and drainage in deffrent village under belan gp2 |
Completion of work |
-
latitude : 26.07059842441231
Longitude : 87.92708544060588
file name : Image_03022022131830057.png
|
2022-02-03 13:18:30.143938 |
167 |
56373924 |
Repairing of mark-ii tubewell with platform soakpit and drainage in deffrent village under belan gp |
350000 |
Repairing of mark-ii tubewell with platform soakpit and drainage in deffrent village under belan gp2 |
Completion of work |
-
latitude : 26.07059842441231
Longitude : 87.92708544060588
file name : Image_03022022131826278.png
|
2022-02-03 13:18:26.361563 |
168 |
47545584 |
MARK-II TUBEWELL WITH SHOP PIT COVER NEAR NOUSAD HOUSE AT MALINGAON |
120000 |
MARK-II TUBEWELL WITH SHOP PIT COVER NEAR NOUSAD HOUSE AT MALINGAON1 |
Completion of work |
-
latitude : 26.05498105287552
Longitude : 87.96595299616456
file name : Image_07112022155501654.png
|
2022-11-07 15:55:01.781244 |
169 |
47547793 |
MARK-II TUBEWELL WITH SHOP PIT COVER AT MAJHAR AREA AT MALINGAON |
120000 |
MARK-II TUBEWELL WITH SHOP PIT COVER AT MAJHAR AREA AT MALINGAON1 |
Completion of work |
-
latitude : 26.0704449
Longitude : 87.9278602
file name : Image_20092022135917197.png
|
2022-09-20 13:59:17.315341 |
170 |
47623752 |
MARK-II TUBE WELL WITH SHOP PIT AT NEAR MUNTAJ ALI HOUSE UNDER U.RAMPUR |
120000 |
MARK-II TUBE WELL WITH SHOP PIT AT NEAR MUNTAJ ALI HOUSE UNDER U.RAMPUR1 |
Completion of work |
-
latitude : 26.0704708
Longitude : 87.9278513
file name : Image_12082022134318792.png
|
2022-08-12 13:43:18.900311 |
171 |
47623752 |
MARK-II TUBE WELL WITH SHOP PIT AT NEAR MUNTAJ ALI HOUSE UNDER U.RAMPUR |
120000 |
MARK-II TUBE WELL WITH SHOP PIT AT NEAR MUNTAJ ALI HOUSE UNDER U.RAMPUR1 |
Completion of work |
-
latitude : 26.0757424402982
Longitude : 87.92524904944003
file name : Image_17082022171456795.png
|
2022-08-17 17:14:56.882506 |
172 |
47623752 |
MARK-II TUBE WELL WITH SHOP PIT AT NEAR MUNTAJ ALI HOUSE UNDER U.RAMPUR |
120000 |
MARK-II TUBE WELL WITH SHOP PIT AT NEAR MUNTAJ ALI HOUSE UNDER U.RAMPUR1 |
Completion of work |
-
latitude : 26.0757424402982
Longitude : 87.92524904944003
file name : Image_17082022171500303.png
|
2022-08-17 17:15:00.389813 |
173 |
47544937 |
MARK-II TUBEWELL WITH SHOP PIT COVER MUSGAR PARA NEAR ETWARI AT GOHORRAH |
120000 |
MARK-II TUBEWELL WITH SHOP PIT COVER MUSGAR PARA NEAR ETWARI AT GOHORRAH1 |
Completion of work |
-
latitude : 26.0704642
Longitude : 87.9278201
file name : Image_24072022113809677.png
|
2022-07-24 11:38:09.777486 |
174 |
47626779 |
MARK-II TUBEWEL WITH SHOP PIT AT MAJHIAPARA MASJID UNDER SHIRSI BIJULIA SANSAD |
120000 |
MARK-II TUBEWEL WITH SHOP PIT AT MAJHIAPARA MASJID UNDER SHIRSI BIJULIA SANSAD1 |
Completion of work |
-
latitude : 26.0704658
Longitude : 87.9278128
file name : Image_18072022143204654.png
|
2022-07-18 14:32:04.820706 |
175 |
47622569 |
MARK-II TUBEWELL WITH SHOP PIT AT LOHAKACHI JUMAMASJIT |
120000 |
MARK-II TUBEWELL WITH SHOP PIT AT LOHAKACHI JUMAMASJIT1 |
Completion of work |
-
latitude : 26.0704658
Longitude : 87.9278128
file name : Image_18072022143215665.png
|
2022-07-18 14:32:15.77906 |
176 |
47620953 |
MARK-II TUBEWELL WITH SHOP PIT AT BATNALA UNDER KANJIA SANSAD |
120000 |
MARK-II TUBEWELL WITH SHOP PIT AT BATNALA UNDER KANJIA SANSAD1 |
Completion of work |
-
latitude : 26.040242901071906
Longitude : 87.91236547753215
file name : Image_18072022124313483.png
|
2022-07-18 12:43:13.596812 |
177 |
47774753 |
MARK-II TUBWEL WITH SHOPE PIT AT PASCHIM TOLA MASJID UNDER SHIRSI BIJULIA SANSAD |
120000 |
MARK-II TUBWEL WITH SHOPE PIT AT PASCHIM TOLA MASJID UNDER SHIRSI BIJULIA SANSAD1 |
Completion of work |
-
latitude : 26.0704658
Longitude : 87.9278128
file name : Image_18072022143209630.png
|
2022-07-18 14:32:09.740482 |
178 |
47549601 |
MARK-II TUBWEL WITH SHOP PIT C8VER AT RANIGANJ PURBA AT T.KAMARSHAL |
120000 |
MARK-II TUBWEL WITH SHOP PIT C8VER AT RANIGANJ PURBA AT T.KAMARSHAL1 |
Plinth level |
-
latitude : 26.06098534539342
Longitude : 87.91328815743327
file name : Image_31082022173242250.png
|
2022-08-31 17:32:42.346924 |
179 |
47557515 |
MARK-II TUBEWELL WITH SHOP PIT COVER ATALI HUSSAIN HOUSE AT BARODIA |
120000 |
MARK-II TUBEWELL WITH SHOP PIT COVER ATALI HUSSAIN HOUSE AT BARODIA1 |
Completion of work |
-
latitude : 26.073571820743382
Longitude : 87.915446665138
file name : Image_18072022124305999.png
|
2022-07-18 12:43:06.120528 |
180 |
47544410 |
MARK-II TUBEWELL WITH SHOP PIT COVER AT HUSSAIN IMMAM HOUSE AT GOHORRAH |
120000 |
MARK-II TUBEWELL WITH SHOP PIT COVER AT HUSSAIN IMMAM HOUSE AT GOHORRAH1 |
Completion of work |
-
latitude : 26.0704642
Longitude : 87.9278201
file name : Image_24072022113806013.png
|
2022-07-24 11:38:06.118446 |
181 |
47760939 |
MARK-II TUBEWEL WITH SHOP PIT COVER AT BILATIBARI KABARSTHAN |
120000 |
MARK-II TUBEWEL WITH SHOP PIT COVER AT BILATIBARI KABARSTHAN 1 |
Plinth level |
-
latitude : 26.069255056791008
Longitude : 87.91439197026193
file name : Image_17082022171449498.png
|
2022-08-17 17:14:49.580572 |
182 |
47760939 |
MARK-II TUBEWEL WITH SHOP PIT COVER AT BILATIBARI KABARSTHAN |
120000 |
MARK-II TUBEWEL WITH SHOP PIT COVER AT BILATIBARI KABARSTHAN 1 |
Completion of work |
-
latitude : 26.069245249964297
Longitude : 87.91437009349465
file name : Image_12072022121401988.png
|
2022-07-12 12:14:02.090727 |
183 |
47643004 |
MARK-II TUBEWEL WITH SHOP PIT COVER AT T.KAMARSHAL MADRASHA UNDER T.KAMARSHAL |
120000 |
MARK-II TUBEWEL WITH SHOP PIT COVER AT T.KAMARSHAL MADRASHA UNDER T.KAMARSHAL1 |
Plinth level |
-
latitude : 26.054101875051856
Longitude : 87.90979206562042
file name : Image_17082022171453125.png
|
2022-08-17 17:14:53.21345 |
184 |
47643004 |
MARK-II TUBEWEL WITH SHOP PIT COVER AT T.KAMARSHAL MADRASHA UNDER T.KAMARSHAL |
120000 |
MARK-II TUBEWEL WITH SHOP PIT COVER AT T.KAMARSHAL MADRASHA UNDER T.KAMARSHAL1 |
Completion of work |
-
latitude : 26.054100994952023
Longitude : 87.90977152995765
file name : Image_18072022124252348.png
|
2022-07-18 12:42:52.464988 |
185 |
47623951 |
MARK-II TUBE WEL WITH SHOP PIT AT IDGAHA UNDER CHAPORE SANSAD |
120000 |
MARK-II TUBE WEL WITH SHOP PIT AT IDGAHA UNDER CHAPORE SANSAD1 |
Completion of work |
-
latitude : 26.0779992
Longitude : 87.9254691
file name : Image_05082022134854197.png
|
2022-08-05 13:48:54.326089 |
186 |
47773223 |
MARK-II TUBEWEL WITH SHOP PIT AT PURBA MALIGAON |
120000 |
MARK-II TUBEWEL WITH SHOP PIT AT PURBA MALIGAON1 |
Completion of work |
-
latitude : 26.052770619280636
Longitude : 87.9741446301341
file name : Image_18072022124234972.png
|
2022-07-18 12:42:35.08564 |
187 |
47772867 |
MARK-II TUBEWEL WITH SHOP PIT AT KALIMANDIR,JHARBARI MALINGAON |
120000 |
MARK-II TUBEWEL WITH SHOP PIT AT KALIMANDIR,JHARBARI MALINGAON1 |
Completion of work |
-
latitude : 26.061183158308268
Longitude : 87.97106612473726
file name : Image_18072022124244242.png
|
2022-07-18 12:42:44.363514 |
188 |
47718202 |
MARK-II TUBEWEL WITH SHOP PIT AT CHURCH AREA UNDER PURBA BALDIABASA |
120000 |
MARK-II TUBEWEL WITH SHOP PIT AT CHURCH AREA UNDER PURBA BALDIABASA1 |
Completion of work |
-
latitude : 26.05793420691043
Longitude : 87.99196011386812
file name : Image_31012023121745308.png
|
2023-01-31 12:17:45.396195 |
189 |
47554177 |
MARK-II TUBEWELL WITH SHOP PIT COVER AT KUMARTOLI KALIMANDIR |
120000 |
MARK-II TUBEWELL WITH SHOP PIT COVER AT KUMARTOLI KALIMANDIR 1 |
Plinth level |
-
latitude : 26.070466
Longitude : 87.9278134
file name : Image_21072022145502116.png
|
2022-07-21 14:55:02.244675 |
190 |
47554177 |
MARK-II TUBEWELL WITH SHOP PIT COVER AT KUMARTOLI KALIMANDIR |
120000 |
MARK-II TUBEWELL WITH SHOP PIT COVER AT KUMARTOLI KALIMANDIR 1 |
Completion of work |
-
latitude : 26.0704679
Longitude : 87.92786
file name : Image_22062022130343596.png
|
2022-06-22 13:03:43.692395 |
191 |
47554177 |
MARK-II TUBEWELL WITH SHOP PIT COVER AT KUMARTOLI KALIMANDIR |
120000 |
MARK-II TUBEWELL WITH SHOP PIT COVER AT KUMARTOLI KALIMANDIR 1 |
Completion of work |
-
latitude : 26.05635975021869
Longitude : 87.92786202393472
file name : Image_04072022130655097.png
|
2022-07-04 13:06:55.187653 |
192 |
47555493 |
MARK-II TUBEWEL WITH SHOP PIT COVER AT KUMARTOLI CHOWK AT P.KAMASHAL |
120000 |
MARK-II TUBEWEL WITH SHOP PIT COVER AT KUMARTOLI CHOWK AT P.KAMASHAL1 |
Plinth level |
-
latitude : 26.080644973553717
Longitude : 87.9259081184864
file name : Image_21072022145555933.png
|
2022-07-21 14:55:56.041873 |
193 |
47621169 |
MARK-II TUBEWEL WITH SHOP PIT AT SANJOY MORE UNDER KANJIA SANSAD |
120000 |
MARK-II TUBEWEL WITH SHOP PIT AT SANJOY MORE UNDER KANJIA SANSAD1 |
Completion of work |
-
latitude : 26.043694694526494
Longitude : 87.91263286024332
file name : Image_18072022124340206.png
|
2022-07-18 12:43:40.335292 |
194 |
47718501 |
MARK-II TUBEWEL WITH SHOPE PIT AT MISSION SCHOOL PURBA BALDIABASA SANSAD |
120000 |
MARK-II TUBEWEL WITH SHOPE PIT AT MISSION SCHOOL PURBA BALDIABASA SANSAD1 |
Completion of work |
-
latitude : 26.0704449
Longitude : 87.9278602
file name : Image_20092022135912792.png
|
2022-09-20 13:59:12.905545 |
195 |
47718851 |
MARK-II TUBEWEL WITH SHOPE PIT AT EIDGAH TOLA MASJID PURBA BALDIABASA |
120000 |
MARK-II TUBEWEL WITH SHOPE PIT AT EIDGAH TOLA MASJID PURBA BALDIABASA1 |
Completion of work |
-
latitude : 26.055705919861794
Longitude : 87.98338584601879
file name : Image_09112022141734387.png
|
2022-11-09 14:17:34.492773 |
196 |
56556586 |
CONSTRUCTION OF PCC ROAD FROM SAHABUDDIN HOUSE TO AMRODDIN HOUSE UNDER PATWA SANSAD |
185000 |
CONSTRUCTION OF PCC ROAD FROM SAHABUDDIN HOUSE TO AMRODDIN HOUSE UNDER PATWA SANSAD1 |
Completion of work |
-
latitude : 26.0831684,26.0831684
Longitude : 87.945581,87.945581
file name : Image_01082023120731437.png
|
2023-08-01 12:07:31.529423 |
197 |
69335154 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.062600538134575
Longitude : 87.98871380276978
file name : Image_07092023153047001.png
|
2023-09-07 15:30:47.085531 |
198 |
69340424 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.061765323393047
Longitude : 87.93900006450713
file name : Image_09102023133740252.png
|
2023-10-09 13:37:40.321542 |
199 |
69342148 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 26.06172500643879
Longitude : 87.98732751980424
file name : Image_17102023143931278.png
|
2023-10-17 14:39:31.351048 |
200 |
69342148 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.06169294565916
Longitude : 87.98732902854681
file name : Image_17102023142209239.png
|
2023-10-17 14:22:09.312739 |
201 |
69344593 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.071032439358532
Longitude : 87.95931503176689
file name : Image_17102023152151310.png
|
2023-10-17 15:21:51.388044 |
202 |
69334145 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.05918453540653
Longitude : 87.97993342392147
file name : Image_19092023132149536.png
|
2023-09-19 13:21:49.612643 |
203 |
69345954 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.056245379149914
Longitude : 87.97313234768808
file name : Image_17102023140215481.png
|
2023-10-17 14:02:15.552126 |
204 |
66827172 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 26.077892021276057,26.044450658373535
Longitude : 87.9289492405951,87.94900034554303
file name : Image_27062024160716262.png
|
2024-06-27 16:07:15.620019 |
205 |
66827172 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 26.04423742275685,26.04418491013348
Longitude : 87.94904770329595,87.94905231334269
file name : Image_27122023133101793.png
|
2023-12-27 13:31:01.854226 |
206 |
66827172 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 26.044228076934814,26.044385824352503
Longitude : 87.94909656979144,87.94923755340278
file name : Image_27122023150730990.png
|
2023-12-27 15:07:31.071722 |
207 |
66827172 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 26.04423742275685,26.04418491013348
Longitude : 87.94904770329595,87.94905231334269
file name : Image_27122023133052142.png
|
2023-12-27 13:30:52.21512 |
208 |
56746603 |
CONSTRUCTION OF PCC ROAD FROM MUSTAFA HOUSE TO ASGAR HOUSE UNDER MALINGAON SANSAD |
190000 |
CONSTRUCTION OF PCC ROAD FROM MUSTAFA HOUSE TO ASGAR HOUSE UNDER MALINGAON SANSAD1 |
Completion of work |
-
latitude : 26.05228241533041,26.052306345663965
Longitude : 87.96809784136713,87.96810370869935
file name : Image_12092023144411475.png
|
2023-09-12 14:44:11.54882 |
209 |
69337308 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.062293970026076
Longitude : 87.99351252615452
file name : Image_07092023154040820.png
|
2023-09-07 15:40:40.892556 |
210 |
69339139 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 26.078492836095393
Longitude : 87.92354727163911
file name : Image_31102023143757158.png
|
2023-10-31 14:37:57.237644 |
211 |
56743190 |
CONSTRUCTION OF PCC ROAD FROM JALIL HOUSE TO ABDUL TUFF HOUSE UNDER BARODIA SANSAD |
190000 |
CONSTRUCTION OF PCC ROAD FROM JALIL HOUSE TO ABDUL TUFF HOUSE UNDER BARODIA SANSAD1 |
Completion of work |
-
latitude : 26.073337462730706,26.073324806056917
Longitude : 87.9164453689009,87.91634386405349
file name : Image_19092023132159074.png
|
2023-09-19 13:21:59.145594 |
212 |
66822195 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 26.04492540936917
Longitude : 87.93828718364239
file name : Image_27062024160719763.png
|
2024-06-27 16:07:19.832134 |
213 |
66822195 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 26.0449334140867
Longitude : 87.93821275234222
file name : Image_22022024150734570.png
|
2024-02-22 15:07:34.64346 |
214 |
66822195 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.044901981949806
Longitude : 87.93825256638229
file name : Image_17012024120538764.png
|
2024-01-17 12:05:38.839717 |
215 |
67829865 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.04074468370527
Longitude : 87.93543272651732
file name : Image_17012024121004505.png
|
2024-01-17 12:10:04.568795 |
216 |
67829865 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.0407569212839
Longitude : 87.93536852113903
file name : Image_17012024120626949.png
|
2024-01-17 12:06:27.018695 |
217 |
69347646 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.021004002541304
Longitude : 87.92793184518814
file name : Image_08012024155957064.png
|
2024-01-08 15:59:57.126159 |
218 |
66825674 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.066352613270283
Longitude : 87.9293065611273
file name : Image_27122023150800150.png
|
2023-12-27 15:08:00.226458 |
219 |
66825674 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.066352613270283
Longitude : 87.9293065611273
file name : Image_27122023150753004.png
|
2023-12-27 15:07:53.082338 |
220 |
66825674 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.065749661065638
Longitude : 87.92909014038742
file name : Image_11122023121957065.png
|
2023-12-11 12:19:57.142623 |
221 |
66825674 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.06573599856347
Longitude : 87.92911050841212
file name : Image_11122023121406725.png
|
2023-12-11 12:14:06.827031 |
222 |
66822222 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.0704848
Longitude : 87.9278551
file name : Image_10012024134727865.png
|
2024-01-10 13:47:27.931689 |
223 |
66827249 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 26.03856153320521,26.038628462702036
Longitude : 87.92803108692169,87.92792019434273
file name : Image_19122023145424334.png
|
2023-12-19 14:54:24.413325 |
224 |
66827249 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 26.03859392926097,26.03859392926097
Longitude : 87.9280067794025,87.9280067794025
file name : Image_19122023144811872.png
|
2023-12-19 14:48:11.944593 |
225 |
66826206 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 26.05077907908708,26.05073574464768
Longitude : 87.9584080260247,87.95844591222703
file name : Image_26062024135456110.png
|
2024-06-26 13:54:56.21368 |
226 |
66826206 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 26.051548831164837,26.05132339987904
Longitude : 87.95836502686143,87.95835656113923
file name : Image_27122023133031031.png
|
2023-12-27 13:30:31.106576 |
227 |
66826206 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 26.050736624747515,26.050774259492755
Longitude : 87.95848270878196,87.95847340486944
file name : Image_27122023125321257.png
|
2023-12-27 12:53:21.240967 |
228 |
66822148 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 26.077948682941496
Longitude : 87.92897656559944
file name : Image_27062024122235337.png
|
2024-06-27 12:22:35.422606 |
229 |
66822148 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 26.07800337485969
Longitude : 87.9288821015507
file name : Image_22022024150104145.png
|
2024-02-22 15:01:04.223594 |
230 |
66822148 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.0776014
Longitude : 87.9277066
file name : Image_20022024120102556.png
|
2024-02-20 12:01:02.66359 |
231 |
68696462 |
Repair of drainage channel |
600000 |
Repair of drainage channel1 |
Roof laid |
-
latitude : 26.0704831
Longitude : 87.9278919
file name : Image_03072024134325216.png
|
2024-07-03 13:43:25.308871 |
232 |
68696462 |
Repair of drainage channel |
600000 |
Repair of drainage channel1 |
Roof laid |
-
latitude : 26.0704826
Longitude : 87.9278963
file name : Image_03072024132505204.png
|
2024-07-03 13:25:05.277423 |
233 |
68696462 |
Repair of drainage channel |
600000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 26.07060915324837
Longitude : 87.92798305861652
file name : Image_03072024124555572.png
|
2024-07-03 12:45:55.634993 |
234 |
68696462 |
Repair of drainage channel |
600000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 26.065349341370165
Longitude : 87.99445725046098
file name : Image_14122023142440861.png
|
2023-12-14 14:24:40.936418 |
235 |
67721603 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.061917832121253
Longitude : 87.98850651830435
file name : Image_26062024145150066.png
|
2024-06-26 14:51:50.137666 |
236 |
67721603 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.06183003168553
Longitude : 87.98851674422622
file name : Image_28122023142745889.png
|
2023-12-28 14:27:45.954759 |
237 |
67721603 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.0704819
Longitude : 87.9278401
file name : Image_28122023142230960.png
|
2023-12-28 14:22:31.033911 |
238 |
66824974 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.06486063450575
Longitude : 87.99867426976562
file name : Image_26062024144332071.png
|
2024-06-26 14:43:32.144584 |
239 |
66824974 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.064781886525452
Longitude : 87.99876663833857
file name : Image_19122023133111550.png
|
2023-12-19 13:31:11.637392 |
240 |
66824974 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.064737630076706
Longitude : 87.99867963418365
file name : Image_19122023132654732.png
|
2023-12-19 13:26:54.800613 |
241 |
56750672 |
CONSTRUCTION OF PCC ROAD FROM SAME HOUSE TO MANGAL PARA UNDER LADHI SANSAD |
190000 |
CONSTRUCTION OF PCC ROAD FROM SAME HOUSE TO MANGAL PARA UNDER LADHI SANSAD1 |
Completion of work |
-
latitude : 26.053877365775406,26.05388763360679
Longitude : 87.95370200648904,87.95369077473879
file name : Image_19122023143929134.png
|
2023-12-19 14:39:29.207236 |
242 |
66827105 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 26.03687718976289,26.036905772052705
Longitude : 87.92504511773586,87.92513170279562
file name : Image_13032024123752612.png
|
2024-03-13 12:37:52.68269 |
243 |
66827105 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 26.036871573887765,26.036927732639015
Longitude : 87.9250917211175,87.9251017794013
file name : Image_12032024115210580.png
|
2024-03-12 11:52:10.648687 |
244 |
66825234 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.046501039527357
Longitude : 87.93704431504011
file name : Image_31052024142551911.png
|
2024-05-31 14:25:51.976613 |
245 |
66825234 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.04660187382251
Longitude : 87.93683309108019
file name : Image_13032024123756687.png
|
2024-03-13 12:37:56.751075 |
246 |
66827034 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 26.062203613109887,26.062162122689188
Longitude : 87.93850150890648,87.93848985806108
file name : Image_13052024121022198.png
|
2024-05-13 12:10:22.265214 |
247 |
66827034 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 26.052353,26.06228441465646
Longitude : 87.9596689,87.93850645422935
file name : Image_13052024120429161.png
|
2024-05-13 12:04:29.230139 |
248 |
66825760 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.040259287692606
Longitude : 87.94855166226625
file name : Image_24062024121710555.png
|
2024-06-24 12:17:10.628586 |
249 |
66825582 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.058569010347128
Longitude : 87.98071755096316
file name : Image_26062024142408485.png
|
2024-06-26 14:24:08.556457 |
250 |
66825582 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.05857353657484
Longitude : 87.98070472665131
file name : Image_19032024135451807.png
|
2024-03-19 13:54:51.909642 |
251 |
66825582 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.05859306640923
Longitude : 87.98078049905598
file name : Image_19032024134046480.png
|
2024-03-19 13:40:46.557066 |
252 |
68690263 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.070395791903138
Longitude : 87.92371893301606
file name : Image_13062024144908945.png
|
2024-06-13 14:49:09.014012 |
253 |
66827648 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 26.06673843227327,26.066692331805825
Longitude : 87.96336273662746,87.963498942554
file name : Image_26062024141338996.png
|
2024-06-26 14:13:39.113005 |
254 |
66827648 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 26.0667160525918,26.0667160525918
Longitude : 87.96329693868756,87.96329693868756
file name : Image_26062024141335379.png
|
2024-06-26 14:13:35.46309 |
255 |
66827648 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 26.067164903506637,26.06713615357876
Longitude : 87.96362718567252,87.96365903690457
file name : Image_04042024133307634.png
|
2024-04-04 13:33:07.713986 |
256 |
66827648 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 26.067148558795452,26.067126053385437
Longitude : 87.96364135108888,87.96366180293262
file name : Image_04042024132132069.png
|
2024-04-04 13:21:32.146432 |
257 |
66826943 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 26.02953434921801,26.02954315021634
Longitude : 87.912254082039,87.91223304346204
file name : Image_27062024114810670.png
|
2024-06-27 11:48:10.757959 |
258 |
66826943 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 26.02956955321133,26.02952353656292
Longitude : 87.91223128326237,87.9121938161552
file name : Image_14052024115446777.png
|
2024-05-14 11:54:46.84439 |
259 |
66826943 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 26.02955723181367,26.029496043920517
Longitude : 87.91222734376788,87.91210647672415
file name : Image_14052024114943413.png
|
2024-05-14 11:49:43.48872 |
260 |
68689163 |
Augmentation of existing sources of Drinking Water |
500000 |
Augmentation of existing sources of Drinking Water1 |
Plinth level |
-
latitude : 26.07087280601263
Longitude : 87.92733522132039
file name : Image_22052024132115558.png
|
2024-05-22 13:21:15.631255 |
261 |
68689163 |
Augmentation of existing sources of Drinking Water |
500000 |
Augmentation of existing sources of Drinking Water1 |
Completion of work |
-
latitude : 26.070950464345515
Longitude : 87.92642259970307
file name : Image_18052024112218272.png
|
2024-05-18 11:22:18.33428 |
262 |
68689163 |
Augmentation of existing sources of Drinking Water |
500000 |
Augmentation of existing sources of Drinking Water1 |
Completion of work |
-
latitude : 26.071020369417965
Longitude : 87.92646702378988
file name : Image_18052024112920823.png
|
2024-05-18 11:29:20.890776 |
263 |
68689163 |
Augmentation of existing sources of Drinking Water |
500000 |
Augmentation of existing sources of Drinking Water1 |
Completion of work |
-
latitude : 26.070950464345515
Longitude : 87.92642259970307
file name : Image_18052024112212842.png
|
2024-05-18 11:22:12.905946 |
264 |
68694629 |
Operation & maintenance of community sanitary complex |
500000 |
Operation & maintenance of community sanitary complex1 |
Plinth level |
-
latitude : 26.070813755504787
Longitude : 87.92627315036952
file name : Image_28052024133714072.png
|
2024-05-28 13:37:14.162861 |
265 |
68694629 |
Operation & maintenance of community sanitary complex |
500000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 26.070883073844016
Longitude : 87.92638404294848
file name : Image_18052024112924263.png
|
2024-05-18 11:29:24.342068 |
266 |
68694629 |
Operation & maintenance of community sanitary complex |
500000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 26.070883073844016
Longitude : 87.92638404294848
file name : Image_18052024112927619.png
|
2024-05-18 11:29:27.696514 |
267 |
68694629 |
Operation & maintenance of community sanitary complex |
500000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 26.070856964215636
Longitude : 87.92625085450709
file name : Image_18052024112209474.png
|
2024-05-18 11:22:09.546205 |
268 |
66827442 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 26.040890528820455,26.040893839672208
Longitude : 87.9145073890686,87.9145211353898
file name : Image_27062024115337356.png
|
2024-06-27 11:53:37.450602 |
269 |
66827442 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 26.040905071422458,26.040872088633478
Longitude : 87.91448383592069,87.91450906544924
file name : Image_23032024114142954.png
|
2024-03-23 11:41:43.025913 |
270 |
66827442 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 26.040906915441155,26.040906915441155
Longitude : 87.91452557779849,87.91452557779849
file name : Image_23032024113239815.png
|
2024-03-23 11:32:39.887996 |
271 |
66826318 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 26.052089799195528,26.05211343616247
Longitude : 87.90953993797302,87.90947229601443
file name : Image_27062024115837978.png
|
2024-06-27 11:58:38.067463 |
272 |
66826318 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 26.05209382250905,26.052122111432254
Longitude : 87.90957514196634,87.9095324780792
file name : Image_23032024113223800.png
|
2024-03-23 11:32:23.888038 |
273 |
66826318 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 26.05206226464361,26.05207663960755
Longitude : 87.90948662906885,87.90951127186418
file name : Image_23032024111449851.png
|
2024-03-23 11:14:49.923853 |
274 |
68696388 |
Purchase of litter bins to be fixed at public places |
100000 |
Purchase of litter bins to be fixed at public places1 |
Plinth level |
-
latitude : 26.0704937
Longitude : 87.9278541
file name : Image_12062024125800243.png
|
2024-06-12 12:58:00.378155 |
275 |
68696388 |
Purchase of litter bins to be fixed at public places |
100000 |
Purchase of litter bins to be fixed at public places1 |
Completion of work |
-
latitude : 26.0704965
Longitude : 87.9278924
file name : Image_12062024120144630.png
|
2024-06-12 12:01:44.733079 |
276 |
66822102 |
Chlorinization of drinking water source |
79000 |
Chlorinization of drinking water source1 |
Plinth level |
-
latitude : 26.071010227315128
Longitude : 87.92658009566367
file name : Image_12062024133527211.png
|
2024-06-12 13:35:27.287347 |
277 |
66822102 |
Chlorinization of drinking water source |
79000 |
Chlorinization of drinking water source1 |
Completion of work |
-
latitude : 26.0704902
Longitude : 87.9278404
file name : Image_03122023153455390.png
|
2023-12-03 15:34:55.456888 |
278 |
66827310 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 26.073274430818856,26.073266677558422
Longitude : 87.91661032475531,87.91656598448753
file name : Image_27062024121108625.png
|
2024-06-27 12:11:08.704966 |
279 |
66827310 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 26.073510297574103,26.07340225484222
Longitude : 87.915776995942,87.91602157987654
file name : Image_26122023141009601.png
|
2023-12-26 14:10:09.675964 |
280 |
66827310 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 26.07344760093838,26.073062871582806
Longitude : 87.9159458912909,87.91596072725952
file name : Image_26122023122423566.png
|
2023-12-26 12:24:23.640066 |
281 |
66825118 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.0687026
Longitude : 87.9584852
file name : Image_01022024131615062.png
|
2024-02-01 13:16:15.153416 |
282 |
66825118 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.07391128782183
Longitude : 87.9592246748507
file name : Image_14122023134914587.png
|
2023-12-14 13:49:14.641644 |
283 |
66825118 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.0704894
Longitude : 87.9278584
file name : Image_14122023133343323.png
|
2023-12-14 13:33:43.392859 |
284 |
66825431 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.060708700679243
Longitude : 87.98946540802717
file name : Image_26062024143445718.png
|
2024-06-26 14:34:45.881482 |
285 |
66825431 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.060729739256203
Longitude : 87.989472867921
file name : Image_19122023131701788.png
|
2023-12-19 13:17:01.873921 |
286 |
66825431 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.060637035407126
Longitude : 87.99021927639842
file name : Image_19122023125300032.png
|
2023-12-19 12:53:00.111053 |
287 |
67721356 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.064316648989916
Longitude : 87.99860168248415
file name : Image_26062024144336964.png
|
2024-06-26 14:43:37.032996 |
288 |
67721356 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.064193937927485
Longitude : 87.9985574260354
file name : Image_31122023140046174.png
|
2023-12-31 14:00:46.237819 |
289 |
67721356 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.064317948184907
Longitude : 87.99864132888615
file name : Image_28122023143634083.png
|
2023-12-28 14:36:34.163797 |
290 |
66826537 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 26.0638904,26.063927812501788
Longitude : 87.9837931,87.98423258587718
file name : Image_26062024142844845.png
|
2024-06-26 14:28:44.921199 |
291 |
66826537 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 26.064549330621958,26.064579128287733
Longitude : 87.98427918925881,87.9842952825129
file name : Image_19032024132552753.png
|
2024-03-19 13:25:52.827507 |
292 |
66826537 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 26.064526280388236,26.06449732091278
Longitude : 87.98428296111524,87.98432948067784
file name : Image_19032024131611792.png
|
2024-03-19 13:16:11.861411 |