1 |
34469796 |
CC ROAD PANCHU SHOP TO KALITALA VIYA GANESH MURMU |
1035353 |
CC ROAD PANCHU SHOP TO KALITALA VIYA GANESH MURMU1 |
Completion of work |
-
latitude : 23.0655857,23.0656611
Longitude : 88.4458507,88.4458493
file name : Image_07072021110650532.png
|
2021-07-07 11:06:50.600068 |
2 |
51751419 |
CONSTRUCTION OF ROAD WITH DRAIN FROM RUKESHPUR TO GANGA DHAR |
707018 |
CONSTRUCTION OF ROAD WITH DRAIN FROM RUKESHPUR TO GANGA DHAR1 |
Completion of work |
-
latitude : 23.0569799,23.0569805
Longitude : 88.4470927,88.4470931
file name : Image_24052021135208010.png
|
2021-05-24 13:52:07.843699 |
3 |
34472334 |
CC ROAD PABAN GHOSH HOUSE TO ABHOD GHOSH HOUSE |
830008 |
CC ROAD PABAN GHOSH HOUSE TO ABHOD GHOSH HOUSE1 |
Completion of work |
-
latitude : 23.0608232,23.06085245
Longitude : 88.45078457,88.45082477
file name : Image_27122021155408594.png
|
2021-12-27 15:54:08.728535 |
4 |
39076478 |
CC ROAD WITH DRAIN FROM IDGATALA TOWARDS KABARSTAN |
867982 |
CC ROAD WITH DRAIN FROM IDGATALA TOWARDS KABARSTAN1 |
Completion of work |
-
latitude : 23.0967071,23.0967053
Longitude : 88.4566004,88.456602
file name : Image_15062021101727350.png
|
2021-06-15 10:17:27.427022 |
5 |
56172659 |
LED STREET LIGHT FIXING FROM SIJA BAZAR TO UTTARGOPALPUR |
507064 |
LED STREET LIGHT FIXING FROM SIJA BAZAR TO UTTARGOPALPUR1 |
Completion of work |
-
latitude : 23.0568804
Longitude : 88.4471055
file name : Image_30122021144604484.png
|
2021-12-30 14:46:04.638835 |
6 |
56172659 |
LED STREET LIGHT FIXING FROM SIJA BAZAR TO UTTARGOPALPUR |
507064 |
LED STREET LIGHT FIXING FROM SIJA BAZAR TO UTTARGOPALPUR1 |
Completion of work |
-
latitude : 23.0569397
Longitude : 88.4472104
file name : Image_30122021144611875.png
|
2021-12-30 14:46:11.961395 |
7 |
56173012 |
MAINTANACE OF TUBEWELL |
177931 |
MAINTANACE OF TUBEWELL1 |
Completion of work |
-
latitude : 23.0569599
Longitude : 88.447296
file name : Image_07042022154223573.png
|
2022-04-07 15:42:23.673056 |
8 |
46477200 |
ROAD SIDE STREET LIGHT SIJA PACHIMPAR AT XVI NO SANSAD |
107276 |
ROAD SIDE STREET LIGHT SIJA PACHIMPAR AT XVI NO SANSAD1 |
Roof laid |
-
latitude : 23.0554117
Longitude : 88.4420824
file name : Image_06052022104356578.png
|
2022-05-06 10:43:56.731707 |
9 |
46477200 |
ROAD SIDE STREET LIGHT SIJA PACHIMPAR AT XVI NO SANSAD |
107276 |
ROAD SIDE STREET LIGHT SIJA PACHIMPAR AT XVI NO SANSAD1 |
Completion of work |
-
latitude : 23.0554782
Longitude : 88.4420837
file name : Image_11022022133654729.png
|
2022-02-11 13:36:54.854528 |
10 |
46476692 |
HIGH MASS LIGHT ROAD SIDE HATIKANDA MORE AT XI NO SANSAD |
107276 |
HIGH MASS LIGHT ROAD SIDE HATIKANDA MORE AT XI NO SANSAD1 |
Plinth level |
-
latitude : 23.08314809
Longitude : 88.45377053
file name : Image_05052022094718422.png
|
2022-05-05 09:47:18.552891 |
11 |
46476692 |
HIGH MASS LIGHT ROAD SIDE HATIKANDA MORE AT XI NO SANSAD |
107276 |
HIGH MASS LIGHT ROAD SIDE HATIKANDA MORE AT XI NO SANSAD1 |
Completion of work |
-
latitude : 23.08313097
Longitude : 88.45371182
file name : Image_09022022175243244.png
|
2022-02-09 17:52:43.355452 |
12 |
34723141 |
HIGH MASS LIGHT FORNT OF MUKTOKESHI TALA |
107276 |
HIGH MASS LIGHT FORNT OF MUKTOKESHI TALA1 |
Plinth level |
-
latitude : 23.0526205
Longitude : 88.4461966
file name : Image_05052022135317050.png
|
2022-05-05 13:53:17.146562 |
13 |
34723141 |
HIGH MASS LIGHT FORNT OF MUKTOKESHI TALA |
107276 |
HIGH MASS LIGHT FORNT OF MUKTOKESHI TALA1 |
Completion of work |
-
latitude : 23.0531136
Longitude : 88.447158
file name : Image_10022022144514799.png
|
2022-02-10 14:45:14.899165 |
14 |
47241203 |
CONSTRUCTION OF CONCRETE ROAD WITH DRAIN FROM MANGAL HEMBRAM HOUSE TO STKK ROAD VIA BIPAL HOUSE AT K |
239203 |
CONSTRUCTION OF CONCRETE ROAD WITH DRAIN FROM MANGAL HEMBRAM HOUSE TO STKK ROAD VIA BIPAL HOUSE AT K1 |
Completion of work |
-
latitude : 23.05231136,23.05234091
Longitude : 88.43755803,88.43754293
file name : Image_07072022161658963.png
|
2022-07-07 16:16:59.055057 |
15 |
46863430 |
CONSTRUCTION OF CONCRETE ROAD WITH CALVERT DRAIN FROM SABUJSANGHA CLUB TO TARUN MRIDHA HOUSE AT BANE |
774271 |
CONSTRUCTION OF CONCRETE ROAD WITH CALVERT DRAIN FROM SABUJSANGHA CLUB TO TARUN MRIDHA HOUSE AT BANE1 |
Roof laid |
-
latitude : 23.0653728,23.0653728
Longitude : 88.4548194,88.4548194
file name : Image_07092022105111820.png
|
2022-09-07 10:51:11.914724 |
16 |
46863430 |
CONSTRUCTION OF CONCRETE ROAD WITH CALVERT DRAIN FROM SABUJSANGHA CLUB TO TARUN MRIDHA HOUSE AT BANE |
774271 |
CONSTRUCTION OF CONCRETE ROAD WITH CALVERT DRAIN FROM SABUJSANGHA CLUB TO TARUN MRIDHA HOUSE AT BANE1 |
Plinth level |
-
latitude : 23.0653852,23.0653852
Longitude : 88.4548168,88.4548168
file name : Image_27072022172928682.png
|
2022-07-27 17:29:28.764808 |
17 |
46863430 |
CONSTRUCTION OF CONCRETE ROAD WITH CALVERT DRAIN FROM SABUJSANGHA CLUB TO TARUN MRIDHA HOUSE AT BANE |
774271 |
CONSTRUCTION OF CONCRETE ROAD WITH CALVERT DRAIN FROM SABUJSANGHA CLUB TO TARUN MRIDHA HOUSE AT BANE1 |
Completion of work |
-
latitude : 23.06503134,23.06503131
Longitude : 88.45439292,88.45439294
file name : Image_27072022102143612.png
|
2022-07-27 10:21:43.719217 |
18 |
46860133 |
CONSTRUCTION OF CONCRETE ROAD WITH DRAIN FROM ARUN MALIK HOUSE TO DILIP GHOSH SHOP AT DHAKCHARA IV N |
522063 |
CONSTRUCTION OF CONCRETE ROAD WITH DRAIN FROM ARUN MALIK HOUSE TO DILIP GHOSH SHOP AT DHAKCHARA IV N1 |
Plinth level |
-
latitude : 23.07669493,23.07669198
Longitude : 88.42644263,88.42644242
file name : Image_04082022173344109.png
|
2022-08-04 17:33:44.195328 |
19 |
46860133 |
CONSTRUCTION OF CONCRETE ROAD WITH DRAIN FROM ARUN MALIK HOUSE TO DILIP GHOSH SHOP AT DHAKCHARA IV N |
522063 |
CONSTRUCTION OF CONCRETE ROAD WITH DRAIN FROM ARUN MALIK HOUSE TO DILIP GHOSH SHOP AT DHAKCHARA IV N1 |
Completion of work |
-
latitude : 23.07562113,23.07562802
Longitude : 88.42674258,88.42674498
file name : Image_12072022102220071.png
|
2022-07-12 10:22:20.140819 |
20 |
46861046 |
CONSTRUCTION OF CONCRETE ROAD WITH DRAIN FROM SASTHITALA TO MADAN GHOSH DHAKCHARA |
497521 |
CONSTRUCTION OF CONCRETE ROAD WITH DRAIN FROM SASTHITALA TO MADAN GHOSH DHAKCHARA1 |
Plinth level |
-
latitude : 23.07449817,23.07449812
Longitude : 88.42622935,88.42622897
file name : Image_04082022174251781.png
|
2022-08-04 17:42:51.874493 |
21 |
46861046 |
CONSTRUCTION OF CONCRETE ROAD WITH DRAIN FROM SASTHITALA TO MADAN GHOSH DHAKCHARA |
497521 |
CONSTRUCTION OF CONCRETE ROAD WITH DRAIN FROM SASTHITALA TO MADAN GHOSH DHAKCHARA1 |
Completion of work |
-
latitude : 23.07440731,23.07437163
Longitude : 88.42659481,88.42670849
file name : Image_12072022101641826.png
|
2022-07-12 10:16:41.9177 |
22 |
98124853 |
Procurement of Computer Printer, UPS, etc. |
600000 |
Procurement of Computer Printer, UPS, etc.1 |
|
-
latitude : 23.0569589
Longitude : 88.447233
file name : Image_27082024150938598.png
|
2024-08-27 15:09:38.791565 |
23 |
34544020 |
CC ROAD CHITTA BANIK TO CLUB VIA SAMAR BISWAS |
1650929 |
CC ROAD CHITTA BANIK TO CLUB VIA SAMAR BISWAS1 |
Completion of work |
-
latitude : 23.07560098,23.07564646
Longitude : 88.46050965,88.46057782
file name : Image_27072022101407367.png
|
2022-07-27 10:14:07.44055 |
24 |
94830975 |
Greywater management system |
152550 |
CONSTRUCTION OF 5 NOS FILTER CHAMBER AT DRAIN AT UTTARGOPALPUR IMIS VILLAGE |
Roof laid |
-
latitude : 23.086903333333332
Longitude : 88.46317666666667
file name : Image_29082024100401514.png
|
2024-08-29 10:04:01.612271 |
25 |
94830975 |
Greywater management system |
152550 |
CONSTRUCTION OF 5 NOS FILTER CHAMBER AT DRAIN AT UTTARGOPALPUR IMIS VILLAGE |
Plinth level |
-
latitude : 23.08688833333333
Longitude : 88.463195
file name : Image_29082024100120896.png
|
2024-08-29 10:01:20.960109 |
26 |
94830975 |
Greywater management system |
152550 |
CONSTRUCTION OF 5 NOS FILTER CHAMBER AT DRAIN AT UTTARGOPALPUR IMIS VILLAGE |
Completion of work |
-
latitude : 23.08687166666667
Longitude : 88.46319999999999
file name : Image_29082024095649876.png
|
2024-08-29 09:56:50.684356 |
27 |
94836069 |
Greywater management system |
154000 |
CONSTRUCTION OF FILTER CHAMBER AT DRAIN AT BARAIL IMIS VILLAGE |
Roof laid |
-
latitude : 23.087388333333333
Longitude : 88.44496166666667
file name : Image_02092024105231191.png
|
2024-09-02 10:52:31.94421 |
28 |
94836069 |
Greywater management system |
154000 |
CONSTRUCTION OF FILTER CHAMBER AT DRAIN AT BARAIL IMIS VILLAGE |
Plinth level |
-
latitude : 23.087388333333333
Longitude : 88.44489999999999
file name : Image_02092024104911255.png
|
2024-09-02 10:49:11.350179 |
29 |
94836069 |
Greywater management system |
154000 |
CONSTRUCTION OF FILTER CHAMBER AT DRAIN AT BARAIL IMIS VILLAGE |
Completion of work |
-
latitude : 23.08742833333333
Longitude : 88.44494333333333
file name : Image_02092024104323247.png
|
2024-09-02 10:43:23.363409 |
30 |
67696107 |
Creation of drainage channel for management of grey water |
1324609 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.057264999999997
Longitude : 88.44925666666668
file name : Image_08122023165334662.png
|
2023-12-08 16:53:34.741426 |
31 |
67696107 |
Creation of drainage channel for management of grey water |
1324609 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.07759666666667
Longitude : 88.44167833333334
file name : Image_23112023120231070.png
|
2023-11-23 12:02:31.142936 |
32 |
67696107 |
Creation of drainage channel for management of grey water |
1324609 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.057833
Longitude : 88.4488039
file name : Image_21112023111431160.png
|
2023-11-21 11:14:31.236494 |
33 |
34717254 |
HIGH MASS LIGHT FORNT OF SUJOY DAS SHOP |
107276 |
HIGH MASS LIGHT FORNT OF SUJOY DAS SHOP1 |
Roof laid |
-
latitude : 23.0555243
Longitude : 88.4420876
file name : Image_03052023102223926.png
|
2023-05-03 10:22:24.19584 |
34 |
34717254 |
HIGH MASS LIGHT FORNT OF SUJOY DAS SHOP |
107276 |
HIGH MASS LIGHT FORNT OF SUJOY DAS SHOP1 |
Plinth level |
-
latitude : 23.0650953
Longitude : 88.44855174
file name : Image_05052022130312389.png
|
2022-05-05 13:03:12.474688 |
35 |
34717254 |
HIGH MASS LIGHT FORNT OF SUJOY DAS SHOP |
107276 |
HIGH MASS LIGHT FORNT OF SUJOY DAS SHOP1 |
Completion of work |
-
latitude : 23.06518074
Longitude : 88.44849156
file name : Image_09022022175232340.png
|
2022-02-09 17:52:32.461917 |
36 |
64212687 |
ROAD PROTECTION WORK ON THE BANK OF HARBHANGA POND KAMALPUR |
1120777 |
ROAD PROTECTION WORK ON THE BANK OF HARBHANGA POND KAMALPUR1 |
Completion of work |
-
latitude : 23.05247134,23.0524745
Longitude : 88.44116176,88.44115841
file name : Image_13072022180849196.png
|
2022-07-13 18:08:49.259973 |
37 |
67693941 |
cc ROAD TOWARDS END OF DINABANDHU HOUSE TA KHAMARGACHI 7 |
297730 |
cc ROAD TOWARDS END OF DINABANDHU HOUSE TA KHAMARGACHI 71 |
Roof laid |
-
latitude : 23.0609862,23.0609862
Longitude : 88.4454298,88.4454298
file name : Image_12052023111910852.png
|
2023-05-12 11:19:10.940778 |
38 |
67693941 |
cc ROAD TOWARDS END OF DINABANDHU HOUSE TA KHAMARGACHI 7 |
297730 |
cc ROAD TOWARDS END OF DINABANDHU HOUSE TA KHAMARGACHI 71 |
Plinth level |
-
latitude : 23.061194999999998,23.061223333333334
Longitude : 88.44559166666667,88.44560000000001
file name : Image_03052023110432384.png
|
2023-05-03 11:04:32.4753 |
39 |
67693941 |
cc ROAD TOWARDS END OF DINABANDHU HOUSE TA KHAMARGACHI 7 |
297730 |
cc ROAD TOWARDS END OF DINABANDHU HOUSE TA KHAMARGACHI 71 |
Completion of work |
-
latitude : 23.061535000000003,23.061516666666662
Longitude : 88.44561666666665,88.44559166666667
file name : Image_02052023123916942.png
|
2023-05-02 12:39:17.085763 |
40 |
67694535 |
CC ROAD TOWORDS END OF SISHUPARA AT KHAMARGACHI |
731738 |
CC ROAD TOWORDS END OF SISHUPARA AT KHAMARGACHI1 |
Roof laid |
-
latitude : 23.06176833333333,23.061771666666665
Longitude : 88.44214666666667,88.44214666666667
file name : Image_12052023111907582.png
|
2023-05-12 11:19:07.680418 |
41 |
67694535 |
CC ROAD TOWORDS END OF SISHUPARA AT KHAMARGACHI |
731738 |
CC ROAD TOWORDS END OF SISHUPARA AT KHAMARGACHI1 |
Plinth level |
-
latitude : 23.061563333333332,23.061615
Longitude : 88.44211166666668,88.44209333333335
file name : Image_03052023110704014.png
|
2023-05-03 11:07:04.114114 |
42 |
67694535 |
CC ROAD TOWORDS END OF SISHUPARA AT KHAMARGACHI |
731738 |
CC ROAD TOWORDS END OF SISHUPARA AT KHAMARGACHI1 |
Completion of work |
-
latitude : 23.061845,23.061836666666668
Longitude : 88.442195,88.44219333333334
file name : Image_02052023123921791.png
|
2023-05-02 12:39:21.942528 |
43 |
67694948 |
CC ROAD TOWARDS CC ROAD TO LALCHARAN MURMU HOUSE TO VIA SANJAY HOUSE AT KHAMARGACHI |
400176 |
CC ROAD TOWARDS CC ROAD TO LALCHARAN MURMU HOUSE TO VIA SANJAY HOUSE AT KHAMARGACHI1 |
Roof laid |
-
latitude : 23.064105,23.064105
Longitude : 88.44667,88.44667
file name : Image_12052023111857854.png
|
2023-05-12 11:18:57.960409 |
44 |
67694948 |
CC ROAD TOWARDS CC ROAD TO LALCHARAN MURMU HOUSE TO VIA SANJAY HOUSE AT KHAMARGACHI |
400176 |
CC ROAD TOWARDS CC ROAD TO LALCHARAN MURMU HOUSE TO VIA SANJAY HOUSE AT KHAMARGACHI1 |
Plinth level |
-
latitude : 23.064403333333335,23.064403333333335
Longitude : 88.44596833333331,88.44596833333331
file name : Image_03052023111236979.png
|
2023-05-03 11:12:37.084485 |
45 |
67694948 |
CC ROAD TOWARDS CC ROAD TO LALCHARAN MURMU HOUSE TO VIA SANJAY HOUSE AT KHAMARGACHI |
400176 |
CC ROAD TOWARDS CC ROAD TO LALCHARAN MURMU HOUSE TO VIA SANJAY HOUSE AT KHAMARGACHI1 |
Completion of work |
-
latitude : 23.064746666666665,23.064746666666665
Longitude : 88.44615833333334,88.446155
file name : Image_02052023123925121.png
|
2023-05-02 12:39:25.239365 |
46 |
67695868 |
Creation of drainage channel for management of grey water |
552144 |
CONSTRUCTION OF PLATFORM, DRAIN AND SOAKPIT FOR 14 NOS EXISTING TUBEWELL AT BANESWARPUR |
Roof laid |
-
latitude : 23.069160000000004
Longitude : 88.45630333333332
file name : Image_08042024180211415.png
|
2024-04-08 18:02:11.491232 |
47 |
67695868 |
Creation of drainage channel for management of grey water |
552144 |
CONSTRUCTION OF PLATFORM, DRAIN AND SOAKPIT FOR 14 NOS EXISTING TUBEWELL AT BANESWARPUR |
Plinth level |
-
latitude : 23.056813333333334
Longitude : 88.44687833333334
file name : Image_10112023171518054.png
|
2023-11-10 17:15:18.132012 |
48 |
67695868 |
Creation of drainage channel for management of grey water |
552144 |
CONSTRUCTION OF PLATFORM, DRAIN AND SOAKPIT FOR 14 NOS EXISTING TUBEWELL AT BANESWARPUR |
Plinth level |
-
latitude : 23.069235000000003
Longitude : 88.45653499999999
file name : Image_17102023154115505.png
|
2023-10-17 15:41:15.590173 |
49 |
67695868 |
Creation of drainage channel for management of grey water |
552144 |
CONSTRUCTION OF PLATFORM, DRAIN AND SOAKPIT FOR 14 NOS EXISTING TUBEWELL AT BANESWARPUR |
Completion of work |
-
latitude : 23.069096666666663
Longitude : 88.45687500000001
file name : Image_07102023172817544.png
|
2023-10-07 17:28:17.624761 |
50 |
59246720 |
TUBE WELL MEINTANANCE FOR GP |
458988 |
TUBE WELL MEINTANANCE FOR GP1 |
Completion of work |
-
latitude : 23.056924
Longitude : 88.4471061
file name : Image_23052023110917875.png
|
2023-05-23 11:09:17.972638 |
51 |
59246840 |
SAFE DRINKING WATER IN GP |
1000000 |
SAFE DRINKING WATER IN GP1 |
Completion of work |
-
latitude : 23.06495
Longitude : 88.44857166666667
file name : Image_06082024165518524.png
|
2024-08-06 16:55:18.590729 |
52 |
59246840 |
SAFE DRINKING WATER IN GP |
1000000 |
SAFE DRINKING WATER IN GP1 |
Completion of work |
-
latitude : 23.0569428
Longitude : 88.447184
file name : Image_23052023111015431.png
|
2023-05-23 11:10:15.518513 |
53 |
39076560 |
ROAD DRAIN SAILEN MONDAL TO SONAR BHAGAR AT RUKS |
707018 |
ROAD DRAIN SAILEN MONDAL TO SONAR BHAGAR AT RUKS1 |
Roof laid |
-
latitude : 23.0729862,23.0729862
Longitude : 88.4592226,88.4592226
file name : Image_01062023114938749.png
|
2023-06-01 11:49:38.865352 |
54 |
39076560 |
ROAD DRAIN SAILEN MONDAL TO SONAR BHAGAR AT RUKS |
707018 |
ROAD DRAIN SAILEN MONDAL TO SONAR BHAGAR AT RUKS1 |
Completion of work |
-
latitude : 23.0729403,23.0729403
Longitude : 88.4592428,88.4592428
file name : Image_27012021160809327.png
|
2021-01-27 16:08:09.408356 |
55 |
67612704 |
STREET LIGHT AT SIJA XVI NO SANSAD |
346362 |
STREET LIGHT AT SIJA XVI NO SANSAD1 |
Roof laid |
-
latitude : 23.055509
Longitude : 88.4421003
file name : Image_06062023112911786.png
|
2023-06-06 11:29:11.892907 |
56 |
67612704 |
STREET LIGHT AT SIJA XVI NO SANSAD |
346362 |
STREET LIGHT AT SIJA XVI NO SANSAD1 |
Plinth level |
-
latitude : 23.0573833
Longitude : 88.4443389
file name : Image_03052023102022961.png
|
2023-05-03 10:20:23.144337 |
57 |
67612704 |
STREET LIGHT AT SIJA XVI NO SANSAD |
346362 |
STREET LIGHT AT SIJA XVI NO SANSAD1 |
Completion of work |
-
latitude : 23.055658333333334
Longitude : 88.44493499999999
file name : Image_06042023111736494.png
|
2023-04-06 11:17:36.604624 |
58 |
59214130 |
HIGH MASS LIGHT AT MUKTARPUR PLAY GROUND SANSAD NO VIII |
152696 |
HIGH MASS LIGHT AT MUKTARPUR PLAY GROUND SANSAD NO VIII1 |
Roof laid |
-
latitude : 23.096569999999996
Longitude : 88.45672
file name : Image_17072023172125672.png
|
2023-07-17 17:21:25.777038 |
59 |
59214130 |
HIGH MASS LIGHT AT MUKTARPUR PLAY GROUND SANSAD NO VIII |
152696 |
HIGH MASS LIGHT AT MUKTARPUR PLAY GROUND SANSAD NO VIII1 |
Plinth level |
-
latitude : 23.059578333333334
Longitude : 88.44886833333334
file name : Image_07062023104229034.png
|
2023-06-07 10:42:29.176587 |
60 |
59214130 |
HIGH MASS LIGHT AT MUKTARPUR PLAY GROUND SANSAD NO VIII |
152696 |
HIGH MASS LIGHT AT MUKTARPUR PLAY GROUND SANSAD NO VIII1 |
Completion of work |
-
latitude : 23.059590000000004
Longitude : 88.44883499999999
file name : Image_05062023102540800.png
|
2023-06-05 10:25:40.909359 |
61 |
67694287 |
CC RODA HARADHAN GHOSH LAND TO KALITALA AT DHAKCHARA V |
470959 |
CC RODA HARADHAN GHOSH LAND TO KALITALA AT DHAKCHARA V1 |
Roof laid |
-
latitude : 23.07168,23.07168
Longitude : 88.42392333333333,88.42392166666666
file name : Image_07082023133016890.png
|
2023-08-07 13:30:17.048773 |
62 |
67694287 |
CC RODA HARADHAN GHOSH LAND TO KALITALA AT DHAKCHARA V |
470959 |
CC RODA HARADHAN GHOSH LAND TO KALITALA AT DHAKCHARA V1 |
Plinth level |
-
latitude : 23.072221666666664,23.07222
Longitude : 88.42351666666667,88.42351500000001
file name : Image_01082023110458743.png
|
2023-08-01 11:04:58.870908 |
63 |
67694287 |
CC RODA HARADHAN GHOSH LAND TO KALITALA AT DHAKCHARA V |
470959 |
CC RODA HARADHAN GHOSH LAND TO KALITALA AT DHAKCHARA V1 |
Completion of work |
-
latitude : 23.072165000000002,23.07216
Longitude : 88.42346166666667,88.42346333333334
file name : Image_06062023112858411.png
|
2023-06-06 11:28:58.501916 |
64 |
67646393 |
Creation of drainage channel for management of grey water |
407914 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.057196666666663
Longitude : 88.43739166666667
file name : Image_06062023112908538.png
|
2023-06-06 11:29:08.627604 |
65 |
67646393 |
Creation of drainage channel for management of grey water |
407914 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.057276666666667
Longitude : 88.43717999999998
file name : Image_03052023105515833.png
|
2023-05-03 10:55:15.916853 |
66 |
67646393 |
Creation of drainage channel for management of grey water |
407914 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.057171666666665
Longitude : 88.43729666666668
file name : Image_02052023123931971.png
|
2023-05-02 12:39:32.093593 |
67 |
59225836 |
HIGH MASS LIGHT AT SIJA AROAT SIJA XIV NO DSANSAD |
152696 |
HIGH MASS LIGHT AT SIJA AROAT SIJA XIV NO DSANSAD1 |
Roof laid |
-
latitude : 23.0550655
Longitude : 88.4464109
file name : Image_19072023103416491.png
|
2023-07-19 10:34:16.601176 |
68 |
59225836 |
HIGH MASS LIGHT AT SIJA AROAT SIJA XIV NO DSANSAD |
152696 |
HIGH MASS LIGHT AT SIJA AROAT SIJA XIV NO DSANSAD1 |
Plinth level |
-
latitude : 23.054718333333334
Longitude : 88.44617333333332
file name : Image_07062023104614731.png
|
2023-06-07 10:46:14.972802 |
69 |
59225836 |
HIGH MASS LIGHT AT SIJA AROAT SIJA XIV NO DSANSAD |
152696 |
HIGH MASS LIGHT AT SIJA AROAT SIJA XIV NO DSANSAD1 |
Completion of work |
-
latitude : 23.054730000000003
Longitude : 88.446125
file name : Image_05062023102836451.png
|
2023-06-05 10:28:36.588009 |
70 |
59202671 |
CONSTRUCTION OF CONCRETE ROAD FROM LALTU MURMU HOUSE TO SALIKTALA AT BARAIL I NO SANSAD |
497876 |
CONSTRUCTION OF CONCRETE ROAD FROM LALTU MURMU HOUSE TO SALIKTALA AT BARAIL I NO SANSAD1 |
Roof laid |
-
latitude : 23.081183333333335,23.081183333333335
Longitude : 88.44708333333334,88.44708333333334
file name : Image_18042023102443672.png
|
2023-04-18 10:24:43.763045 |
71 |
59202671 |
CONSTRUCTION OF CONCRETE ROAD FROM LALTU MURMU HOUSE TO SALIKTALA AT BARAIL I NO SANSAD |
497876 |
CONSTRUCTION OF CONCRETE ROAD FROM LALTU MURMU HOUSE TO SALIKTALA AT BARAIL I NO SANSAD1 |
Plinth level |
-
latitude : 23.08107,23.08107
Longitude : 88.447715,88.447715
file name : Image_13022023103300875.png
|
2023-02-13 10:33:00.966841 |
72 |
59202671 |
CONSTRUCTION OF CONCRETE ROAD FROM LALTU MURMU HOUSE TO SALIKTALA AT BARAIL I NO SANSAD |
497876 |
CONSTRUCTION OF CONCRETE ROAD FROM LALTU MURMU HOUSE TO SALIKTALA AT BARAIL I NO SANSAD1 |
Completion of work |
-
latitude : 23.08129333333333,23.08129166666667,23.08129333333333
Longitude : 88.446745,88.44675000000001,88.44676499999998
file name : Image_07022023104347756.png
|
2023-02-07 10:43:47.892174 |
73 |
59204099 |
CONSTRUCTION OF CONCRETE ROAD FROM DIPAK SEN HOUSE TO RAMESH SEN HOUSE AT BARAIL II NO SANSAD |
191072 |
CONSTRUCTION OF CONCRETE ROAD FROM DIPAK SEN HOUSE TO RAMESH SEN HOUSE AT BARAIL II NO SANSAD1 |
Roof laid |
-
latitude : 23.085579999999997,23.085579999999997
Longitude : 88.44614833333331,88.44615166666667
file name : Image_18042023102014402.png
|
2023-04-18 10:20:14.494256 |
74 |
59204099 |
CONSTRUCTION OF CONCRETE ROAD FROM DIPAK SEN HOUSE TO RAMESH SEN HOUSE AT BARAIL II NO SANSAD |
191072 |
CONSTRUCTION OF CONCRETE ROAD FROM DIPAK SEN HOUSE TO RAMESH SEN HOUSE AT BARAIL II NO SANSAD1 |
Plinth level |
-
latitude : 23.085615,23.085615
Longitude : 88.44614333333332,88.44614333333332
file name : Image_13022023102705764.png
|
2023-02-13 10:27:05.850773 |
75 |
59204099 |
CONSTRUCTION OF CONCRETE ROAD FROM DIPAK SEN HOUSE TO RAMESH SEN HOUSE AT BARAIL II NO SANSAD |
191072 |
CONSTRUCTION OF CONCRETE ROAD FROM DIPAK SEN HOUSE TO RAMESH SEN HOUSE AT BARAIL II NO SANSAD1 |
Completion of work |
-
latitude : 23.085609999999996,23.085613333333338
Longitude : 88.44615666666665,88.44615666666665
file name : Image_07022023103333089.png
|
2023-02-07 10:33:33.208405 |
76 |
59204754 |
CONSTRUCTION OF CONCRETE ROAD FROM BAGANPARA AJIT MONDAL HOUSE TO BAROYARI VIA BASTUTHAKUR BARAIL |
199144 |
CONSTRUCTION OF CONCRETE ROAD FROM BAGANPARA AJIT MONDAL HOUSE TO BAROYARI VIA BASTUTHAKUR BARAIL1 |
Roof laid |
-
latitude : 23.085140000000003,23.085140000000003
Longitude : 88.44199833333332,88.44199833333332
file name : Image_18042023111650496.png
|
2023-04-18 11:16:50.61285 |
77 |
59204754 |
CONSTRUCTION OF CONCRETE ROAD FROM BAGANPARA AJIT MONDAL HOUSE TO BAROYARI VIA BASTUTHAKUR BARAIL |
199144 |
CONSTRUCTION OF CONCRETE ROAD FROM BAGANPARA AJIT MONDAL HOUSE TO BAROYARI VIA BASTUTHAKUR BARAIL1 |
Plinth level |
-
latitude : 23.085366666666665,23.085366666666665
Longitude : 88.44224333333335,88.44224333333335
file name : Image_13022023104845574.png
|
2023-02-13 10:48:45.673972 |
78 |
59204754 |
CONSTRUCTION OF CONCRETE ROAD FROM BAGANPARA AJIT MONDAL HOUSE TO BAROYARI VIA BASTUTHAKUR BARAIL |
199144 |
CONSTRUCTION OF CONCRETE ROAD FROM BAGANPARA AJIT MONDAL HOUSE TO BAROYARI VIA BASTUTHAKUR BARAIL1 |
Completion of work |
-
latitude : 23.085296666666668,23.085309999999996
Longitude : 88.44219,88.44220333333332
file name : Image_07022023105103294.png
|
2023-02-07 10:51:03.41147 |
79 |
59239592 |
NEW TUBE WELL WITH PLATFORM SOKPIT BESIDE AGHEN MATH AT HAMJANPUR III NO SANSAD |
111173 |
NEW TUBE WELL WITH PLATFORM SOKPIT BESIDE AGHEN MATH AT HAMJANPUR III NO SANSAD1 |
Roof laid |
-
latitude : 23.0569907
Longitude : 88.4472486
file name : Image_18042023113924502.png
|
2023-04-18 11:39:24.630903 |
80 |
59239592 |
NEW TUBE WELL WITH PLATFORM SOKPIT BESIDE AGHEN MATH AT HAMJANPUR III NO SANSAD |
111173 |
NEW TUBE WELL WITH PLATFORM SOKPIT BESIDE AGHEN MATH AT HAMJANPUR III NO SANSAD1 |
Plinth level |
-
latitude : 23.056992
Longitude : 88.4472749
file name : Image_23032023131557655.png
|
2023-03-23 13:15:57.748876 |
81 |
59239592 |
NEW TUBE WELL WITH PLATFORM SOKPIT BESIDE AGHEN MATH AT HAMJANPUR III NO SANSAD |
111173 |
NEW TUBE WELL WITH PLATFORM SOKPIT BESIDE AGHEN MATH AT HAMJANPUR III NO SANSAD1 |
Completion of work |
-
latitude : 23.0569916
Longitude : 88.4472654
file name : Image_15032023135605682.png
|
2023-03-15 13:56:05.780991 |
82 |
59239592 |
NEW TUBE WELL WITH PLATFORM SOKPIT BESIDE AGHEN MATH AT HAMJANPUR III NO SANSAD |
111173 |
NEW TUBE WELL WITH PLATFORM SOKPIT BESIDE AGHEN MATH AT HAMJANPUR III NO SANSAD1 |
Completion of work |
-
latitude : 23.0569916
Longitude : 88.4472654
file name : Image_15032023135613450.png
|
2023-03-15 13:56:13.549648 |
83 |
59211751 |
STREET LIGHT MUKTARPUR BASSTAND TO SISHUPARA VIA SOMNATH TO BANESWARPUR BASSTAND AT KHAMARGACHI VII |
327232 |
STREET LIGHT MUKTARPUR BASSTAND TO SISHUPARA VIA SOMNATH TO BANESWARPUR BASSTAND AT KHAMARGACHI VII1 |
Roof laid |
-
latitude : 23.06202
Longitude : 88.44688833333333
file name : Image_13042023154546485.png
|
2023-04-13 15:45:46.639306 |
84 |
59211751 |
STREET LIGHT MUKTARPUR BASSTAND TO SISHUPARA VIA SOMNATH TO BANESWARPUR BASSTAND AT KHAMARGACHI VII |
327232 |
STREET LIGHT MUKTARPUR BASSTAND TO SISHUPARA VIA SOMNATH TO BANESWARPUR BASSTAND AT KHAMARGACHI VII1 |
Plinth level |
-
latitude : 23.075608333333335
Longitude : 88.42668166666665
file name : Image_23032023134922859.png
|
2023-03-23 13:49:22.976212 |
85 |
59211751 |
STREET LIGHT MUKTARPUR BASSTAND TO SISHUPARA VIA SOMNATH TO BANESWARPUR BASSTAND AT KHAMARGACHI VII |
327232 |
STREET LIGHT MUKTARPUR BASSTAND TO SISHUPARA VIA SOMNATH TO BANESWARPUR BASSTAND AT KHAMARGACHI VII1 |
Completion of work |
-
latitude : 23.062115000000002
Longitude : 88.44708833333334
file name : Image_13022023110151259.png
|
2023-02-13 11:01:51.350636 |
86 |
67612547 |
STREET LIGHT FROM GOBINDA HALDER HOUSE TO MIHIR HALDER VIA RAMPRASAD MALO TO SABJI AROAT AT SIJA XIV |
246884 |
STREET LIGHT FROM GOBINDA HALDER HOUSE TO MIHIR HALDER VIA RAMPRASAD MALO TO SABJI AROAT AT SIJA XIV1 |
Roof laid |
-
latitude : 23.0567476
Longitude : 88.447033
file name : Image_20042023103133800.png
|
2023-04-20 10:31:33.989695 |
87 |
67612547 |
STREET LIGHT FROM GOBINDA HALDER HOUSE TO MIHIR HALDER VIA RAMPRASAD MALO TO SABJI AROAT AT SIJA XIV |
246884 |
STREET LIGHT FROM GOBINDA HALDER HOUSE TO MIHIR HALDER VIA RAMPRASAD MALO TO SABJI AROAT AT SIJA XIV1 |
Plinth level |
-
latitude : 23.096506666666663
Longitude : 88.45682333333335
file name : Image_13042023174045532.png
|
2023-04-13 17:40:45.68844 |
88 |
67612547 |
STREET LIGHT FROM GOBINDA HALDER HOUSE TO MIHIR HALDER VIA RAMPRASAD MALO TO SABJI AROAT AT SIJA XIV |
246884 |
STREET LIGHT FROM GOBINDA HALDER HOUSE TO MIHIR HALDER VIA RAMPRASAD MALO TO SABJI AROAT AT SIJA XIV1 |
Completion of work |
-
latitude : 23.0564768
Longitude : 88.4469633
file name : Image_06042023103731217.png
|
2023-04-06 10:37:31.315778 |
89 |
67613191 |
STREET LIGHT FROM CHIDAM RAJBANSHI TO KALYAN MUKHERJEE HOUSE VIA SUNIL DAS TO BANAMALI AT RUKESHPUR |
308101 |
STREET LIGHT FROM CHIDAM RAJBANSHI TO KALYAN MUKHERJEE HOUSE VIA SUNIL DAS TO BANAMALI AT RUKESHPUR1 |
Roof laid |
-
latitude : 23.0729753
Longitude : 88.459233
file name : Image_28072023172739044.png
|
2023-07-28 17:27:39.183484 |
90 |
67613191 |
STREET LIGHT FROM CHIDAM RAJBANSHI TO KALYAN MUKHERJEE HOUSE VIA SUNIL DAS TO BANAMALI AT RUKESHPUR |
308101 |
STREET LIGHT FROM CHIDAM RAJBANSHI TO KALYAN MUKHERJEE HOUSE VIA SUNIL DAS TO BANAMALI AT RUKESHPUR1 |
Plinth level |
-
latitude : 23.075868333333332
Longitude : 88.46166
file name : Image_07062023103504724.png
|
2023-06-07 10:35:04.869732 |
91 |
67613191 |
STREET LIGHT FROM CHIDAM RAJBANSHI TO KALYAN MUKHERJEE HOUSE VIA SUNIL DAS TO BANAMALI AT RUKESHPUR |
308101 |
STREET LIGHT FROM CHIDAM RAJBANSHI TO KALYAN MUKHERJEE HOUSE VIA SUNIL DAS TO BANAMALI AT RUKESHPUR1 |
Completion of work |
-
latitude : 23.073678333333337
Longitude : 88.46055999999999
file name : Image_01062023113757190.png
|
2023-06-01 11:37:57.381533 |
92 |
67615154 |
STREET LIGHT AT SIJA XV NO SANSAD |
346362 |
STREET LIGHT AT SIJA XV NO SANSAD1 |
Roof laid |
-
latitude : 23.0541363
Longitude : 88.4457115
file name : Image_20042023103358596.png
|
2023-04-20 10:33:58.830478 |
93 |
67615154 |
STREET LIGHT AT SIJA XV NO SANSAD |
346362 |
STREET LIGHT AT SIJA XV NO SANSAD1 |
Plinth level |
-
latitude : 23.0541587
Longitude : 88.4457232
file name : Image_13042023174234600.png
|
2023-04-13 17:42:34.799485 |
94 |
67615154 |
STREET LIGHT AT SIJA XV NO SANSAD |
346362 |
STREET LIGHT AT SIJA XV NO SANSAD1 |
Completion of work |
-
latitude : 23.0542715
Longitude : 88.4458576
file name : Image_06042023111741008.png
|
2023-04-06 11:17:41.196082 |
95 |
67695742 |
Creation of drainage channel for management of grey water |
722881 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.096641666666663
Longitude : 88.45678000000001
file name : Image_25042023171920568.png
|
2023-04-25 17:19:20.658526 |
96 |
67695742 |
Creation of drainage channel for management of grey water |
722881 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.0569972
Longitude : 88.4472476
file name : Image_18042023114801247.png
|
2023-04-18 11:48:01.361821 |
97 |
67695742 |
Creation of drainage channel for management of grey water |
722881 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.0569909
Longitude : 88.4472653
file name : Image_30032023110657310.png
|
2023-03-30 11:06:57.554152 |
98 |
67696242 |
Creation of drainage channel for management of grey water |
949422 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.072843333333335
Longitude : 88.42975833333334
file name : Image_02022024102132992.png
|
2024-02-02 10:21:33.069078 |
99 |
67696242 |
Creation of drainage channel for management of grey water |
949422 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.072821666666663
Longitude : 88.43025000000002
file name : Image_18122023104734978.png
|
2023-12-18 10:47:35.049762 |
100 |
67696242 |
Creation of drainage channel for management of grey water |
949422 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.072754999999997
Longitude : 88.43020499999999
file name : Image_06062023112918362.png
|
2023-06-06 11:29:18.453726 |
101 |
67696242 |
Creation of drainage channel for management of grey water |
949422 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.072754999999997
Longitude : 88.43020499999999
file name : Image_06062023112902034.png
|
2023-06-06 11:29:02.122626 |
102 |
67696508 |
Creation of drainage channel for management of grey water |
1472442 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.075691666666664
Longitude : 88.45983333333334
file name : Image_01062023114620354.png
|
2023-06-01 11:46:20.496112 |
103 |
67696508 |
Creation of drainage channel for management of grey water |
1472442 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.075660000000003
Longitude : 88.46031666666667
file name : Image_11052023130107848.png
|
2023-05-11 13:01:07.948401 |
104 |
67696508 |
Creation of drainage channel for management of grey water |
1472442 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.07567333333333
Longitude : 88.45988000000001
file name : Image_25042023172547941.png
|
2023-04-25 17:25:48.017683 |
105 |
64212710 |
CONSTRUCTION OF CC ROAD FROM BARAIL ADHIBASI PARA CC ROAD TO ICDS AT BARAIL |
222569 |
CONSTRUCTION OF CC ROAD FROM BARAIL ADHIBASI PARA CC ROAD TO ICDS AT BARAIL1 |
Roof laid |
-
latitude : 23.0569568,23.0569592
Longitude : 88.4472552,88.4472554
file name : Image_03052023112943666.png
|
2023-05-03 11:29:43.776183 |
106 |
64212710 |
CONSTRUCTION OF CC ROAD FROM BARAIL ADHIBASI PARA CC ROAD TO ICDS AT BARAIL |
222569 |
CONSTRUCTION OF CC ROAD FROM BARAIL ADHIBASI PARA CC ROAD TO ICDS AT BARAIL1 |
Plinth level |
-
latitude : 23.081979999999998,23.081979999999998
Longitude : 88.44654333333334,88.44654166666666
file name : Image_18042023111607685.png
|
2023-04-18 11:16:07.795758 |
107 |
64212710 |
CONSTRUCTION OF CC ROAD FROM BARAIL ADHIBASI PARA CC ROAD TO ICDS AT BARAIL |
222569 |
CONSTRUCTION OF CC ROAD FROM BARAIL ADHIBASI PARA CC ROAD TO ICDS AT BARAIL1 |
Completion of work |
-
latitude : 23.082006666666665,23.082006666666665
Longitude : 88.44654666666665,88.44654666666665
file name : Image_13022023104224918.png
|
2023-02-13 10:42:25.025031 |
108 |
46860471 |
CONSTRUCTION OF CONCRETE ROAD DRAIN WITH DRAIN FROM DURGATALA TO JAGANNATH TO VIA LAXMAN |
461425 |
CONSTRUCTION OF CONCRETE ROAD DRAIN WITH DRAIN FROM DURGATALA TO JAGANNATH TO VIA LAXMAN1 |
Roof laid |
-
latitude : 23.0569594,23.0569592
Longitude : 88.4472564,88.4472562
file name : Image_03052023113957182.png
|
2023-05-03 11:39:57.307162 |
109 |
46860471 |
CONSTRUCTION OF CONCRETE ROAD DRAIN WITH DRAIN FROM DURGATALA TO JAGANNATH TO VIA LAXMAN |
461425 |
CONSTRUCTION OF CONCRETE ROAD DRAIN WITH DRAIN FROM DURGATALA TO JAGANNATH TO VIA LAXMAN1 |
Completion of work |
-
latitude : 23.0569928,23.0569928
Longitude : 88.447274,88.447274
file name : Image_23032023130245221.png
|
2023-03-23 13:02:45.339269 |
110 |
46860471 |
CONSTRUCTION OF CONCRETE ROAD DRAIN WITH DRAIN FROM DURGATALA TO JAGANNATH TO VIA LAXMAN |
461425 |
CONSTRUCTION OF CONCRETE ROAD DRAIN WITH DRAIN FROM DURGATALA TO JAGANNATH TO VIA LAXMAN1 |
Completion of work |
-
latitude : 23.075381666666665,23.075383333333335
Longitude : 88.42701333333335,88.427015
file name : Image_14032023151155105.png
|
2023-03-14 15:11:55.195919 |
111 |
66730209 |
Creation of drainage channel for management of grey water |
1217338 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.0569581
Longitude : 88.4472551
file name : Image_03052023105833320.png
|
2023-05-03 10:58:33.420834 |
112 |
66730209 |
Creation of drainage channel for management of grey water |
1217338 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.07498666666667
Longitude : 88.43855333333335
file name : Image_02052023123928600.png
|
2023-05-02 12:39:28.784809 |
113 |
66730209 |
Creation of drainage channel for management of grey water |
1217338 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.074979999999996
Longitude : 88.43920666666666
file name : Image_21022023103628673.png
|
2023-02-21 10:36:28.766543 |
114 |
59211080 |
CONSTRUCTION OF CONCRETE ROAD FROM BESIDE GIRLS HIGH SCHOOL GATE AT KHAMARGACHI VII NO SANSAD |
162464 |
CONSTRUCTION OF CONCRETE ROAD FROM BESIDE GIRLS HIGH SCHOOL GATE AT KHAMARGACHI VII NO SANSAD1 |
Roof laid |
-
latitude : 23.0614282,23.0614278
Longitude : 88.4465091,88.4465114
file name : Image_26042023151832298.png
|
2023-04-26 15:18:32.411467 |
115 |
59211080 |
CONSTRUCTION OF CONCRETE ROAD FROM BESIDE GIRLS HIGH SCHOOL GATE AT KHAMARGACHI VII NO SANSAD |
162464 |
CONSTRUCTION OF CONCRETE ROAD FROM BESIDE GIRLS HIGH SCHOOL GATE AT KHAMARGACHI VII NO SANSAD1 |
Plinth level |
-
latitude : 23.060576666666666,23.060536666666668
Longitude : 88.44670833333333,88.44668166666666
file name : Image_23032023135709296.png
|
2023-03-23 13:57:09.382264 |
116 |
59211080 |
CONSTRUCTION OF CONCRETE ROAD FROM BESIDE GIRLS HIGH SCHOOL GATE AT KHAMARGACHI VII NO SANSAD |
162464 |
CONSTRUCTION OF CONCRETE ROAD FROM BESIDE GIRLS HIGH SCHOOL GATE AT KHAMARGACHI VII NO SANSAD1 |
Completion of work |
-
latitude : 23.06125833333333,23.061239999999998
Longitude : 88.44658333333334,88.446605
file name : Image_10022023173752864.png
|
2023-02-10 17:37:52.961509 |
117 |
59239292 |
NEW TUBEWELL PLATFORM SOKPIT BESIDE HOUSE OF AMIT KHANRA AT BARAL I NO SANSAD |
111173 |
NEW TUBEWELL PLATFORM SOKPIT BESIDE HOUSE OF AMIT KHANRA AT BARAL I NO SANSAD1 |
Roof laid |
-
latitude : 23.085578333333334
Longitude : 88.44357166666666
file name : Image_20082024111306040.png
|
2024-08-20 11:13:06.110154 |
118 |
59239292 |
NEW TUBEWELL PLATFORM SOKPIT BESIDE HOUSE OF AMIT KHANRA AT BARAL I NO SANSAD |
111173 |
NEW TUBEWELL PLATFORM SOKPIT BESIDE HOUSE OF AMIT KHANRA AT BARAL I NO SANSAD1 |
Plinth level |
-
latitude : 23.08557166666667
Longitude : 88.443595
file name : Image_18042023111658484.png
|
2023-04-18 11:16:58.594583 |
119 |
59239026 |
NEW TUBEWELL WITH PLATFROM SOKPIT BESIDE HOUSE OF ANIMESH HANSDA AT ABARAIL I NO SANSAD |
111173 |
NEW TUBEWELL WITH PLATFROM SOKPIT BESIDE HOUSE OF ANIMESH HANSDA AT ABARAIL I NO SANSAD1 |
Roof laid |
-
latitude : 23.08237166666667
Longitude : 88.44597666666665
file name : Image_18042023111642586.png
|
2023-04-18 11:16:42.700665 |
120 |
59239026 |
NEW TUBEWELL WITH PLATFROM SOKPIT BESIDE HOUSE OF ANIMESH HANSDA AT ABARAIL I NO SANSAD |
111173 |
NEW TUBEWELL WITH PLATFROM SOKPIT BESIDE HOUSE OF ANIMESH HANSDA AT ABARAIL I NO SANSAD1 |
Plinth level |
-
latitude : 23.0569916
Longitude : 88.4472749
file name : Image_23032023132130347.png
|
2023-03-23 13:21:30.451244 |
121 |
59239026 |
NEW TUBEWELL WITH PLATFROM SOKPIT BESIDE HOUSE OF ANIMESH HANSDA AT ABARAIL I NO SANSAD |
111173 |
NEW TUBEWELL WITH PLATFROM SOKPIT BESIDE HOUSE OF ANIMESH HANSDA AT ABARAIL I NO SANSAD1 |
Completion of work |
-
latitude : 23.0569911
Longitude : 88.4472654
file name : Image_15032023135557678.png
|
2023-03-15 13:55:57.783121 |
122 |
59210385 |
HIGH MASS LIGHT HARISALPUR AT GOURNAI VI NO SANSAD |
152696 |
HIGH MASS LIGHT HARISALPUR AT GOURNAI VI NO SANSAD1 |
Roof laid |
-
latitude : 23.063460000000003
Longitude : 88.42705833333333
file name : Image_01082023103229561.png
|
2023-08-01 10:32:29.668377 |
123 |
59210385 |
HIGH MASS LIGHT HARISALPUR AT GOURNAI VI NO SANSAD |
152696 |
HIGH MASS LIGHT HARISALPUR AT GOURNAI VI NO SANSAD1 |
Plinth level |
-
latitude : 23.063526666666668
Longitude : 88.42701833333334
file name : Image_17072023172015718.png
|
2023-07-17 17:20:15.817602 |
124 |
59210385 |
HIGH MASS LIGHT HARISALPUR AT GOURNAI VI NO SANSAD |
152696 |
HIGH MASS LIGHT HARISALPUR AT GOURNAI VI NO SANSAD1 |
Completion of work |
-
latitude : 23.063284999999997
Longitude : 88.42696499999998
file name : Image_06062023112854500.png
|
2023-06-06 11:28:54.61696 |
125 |
59209916 |
HIGH MASS LIGHT KALITALA AT GOURNAI VI NO SANSAD |
152696 |
HIGH MASS LIGHT KALITALA AT GOURNAI VI NO SANSAD1 |
Roof laid |
-
latitude : 23.075105
Longitude : 88.43062666666668
file name : Image_22112023102933435.png
|
2023-11-22 10:29:33.521845 |
126 |
59209916 |
HIGH MASS LIGHT KALITALA AT GOURNAI VI NO SANSAD |
152696 |
HIGH MASS LIGHT KALITALA AT GOURNAI VI NO SANSAD1 |
Plinth level |
-
latitude : 23.096584999999997
Longitude : 88.45681
file name : Image_01082023102706602.png
|
2023-08-01 10:27:06.771772 |
127 |
59209916 |
HIGH MASS LIGHT KALITALA AT GOURNAI VI NO SANSAD |
152696 |
HIGH MASS LIGHT KALITALA AT GOURNAI VI NO SANSAD1 |
Completion of work |
-
latitude : 23.07416166666667
Longitude : 88.43060833333332
file name : Image_06062023112905356.png
|
2023-06-06 11:29:05.46211 |
128 |
59209916 |
HIGH MASS LIGHT KALITALA AT GOURNAI VI NO SANSAD |
152696 |
HIGH MASS LIGHT KALITALA AT GOURNAI VI NO SANSAD1 |
Completion of work |
-
latitude : 23.07416166666667
Longitude : 88.43060833333332
file name : Image_06062023112921413.png
|
2023-06-06 11:29:21.523297 |
129 |
67616331 |
STREET LIGHT AT KAMALPUR XVIII NO SANSAD |
346392 |
STREET LIGHT AT KAMALPUR XVIII NO SANSAD1 |
Roof laid |
-
latitude : 23.06037666666667
Longitude : 88.43986000000001
file name : Image_02112023162524109.png
|
2023-11-02 16:25:24.196014 |
130 |
67616331 |
STREET LIGHT AT KAMALPUR XVIII NO SANSAD |
346392 |
STREET LIGHT AT KAMALPUR XVIII NO SANSAD1 |
Plinth level |
-
latitude : 23.0578017
Longitude : 88.4370871
file name : Image_07082023130229792.png
|
2023-08-07 13:02:29.920504 |
131 |
67616331 |
STREET LIGHT AT KAMALPUR XVIII NO SANSAD |
346392 |
STREET LIGHT AT KAMALPUR XVIII NO SANSAD1 |
Completion of work |
-
latitude : 23.05934333333333
Longitude : 88.43684999999999
file name : Image_01082023111232926.png
|
2023-08-01 11:12:33.060021 |
132 |
67696636 |
Creation of drainage channel for management of grey water |
747030 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.07585333333333
Longitude : 88.440655
file name : Image_08122023162749314.png
|
2023-12-08 16:27:49.39149 |
133 |
67696636 |
Creation of drainage channel for management of grey water |
747030 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.075174999999998
Longitude : 88.43939666666665
file name : Image_06122023103425238.png
|
2023-12-06 10:34:25.315475 |
134 |
67696636 |
Creation of drainage channel for management of grey water |
747030 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.077381666666664
Longitude : 88.44170166666666
file name : Image_23112023112540335.png
|
2023-11-23 11:25:40.407727 |
135 |
67861314 |
Construction of roads |
961015 |
Construction of roads |
Roof laid |
-
latitude : 23.0845634,23.0845634
Longitude : 88.4671806,88.4671806
file name : Image_21112023101525824.png
|
2023-11-21 10:15:25.896761 |
136 |
67861314 |
Construction of roads |
961015 |
Construction of roads |
Plinth level |
-
latitude : 23.096629999999998,23.096629999999998
Longitude : 88.45679666666668,88.45679666666668
file name : Image_18102023103655358.png
|
2023-10-18 10:36:55.427302 |
137 |
67861314 |
Construction of roads |
961015 |
Construction of roads |
Completion of work |
-
latitude : 23.06927,23.06927
Longitude : 88.45649,88.45649
file name : Image_17102023154218105.png
|
2023-10-17 15:42:18.183607 |
138 |
67861314 |
Construction of roads |
961015 |
Construction of roads |
Completion of work |
-
latitude : 23.084800000000005,23.084800000000005
Longitude : 88.46653166666668,88.46653166666668
file name : Image_11102023100339693.png
|
2023-10-11 10:03:39.761959 |
139 |
70885645 |
Creation of drainage channel for management of grey water |
238874 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.096526666666666
Longitude : 88.45677499999998
file name : Image_25022024110410228.png
|
2024-02-25 11:04:10.290078 |
140 |
70885645 |
Creation of drainage channel for management of grey water |
238874 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.083979999999997
Longitude : 88.46559666666666
file name : Image_12022024101054436.png
|
2024-02-12 10:10:54.509211 |
141 |
70885645 |
Creation of drainage channel for management of grey water |
238874 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.083915
Longitude : 88.46590833333333
file name : Image_19012024111643576.png
|
2024-01-19 11:16:43.649294 |
142 |
98123147 |
Drainage Construction |
102501 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.067684999999997
Longitude : 88.45542833333333
file name : Image_18042024145105088.png
|
2024-04-18 14:51:05.155779 |
143 |
98123147 |
Drainage Construction |
102501 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.0671836
Longitude : 88.4550952
file name : Image_18042024144554746.png
|
2024-04-18 14:45:54.81773 |
144 |
98123147 |
Drainage Construction |
102501 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.0671502
Longitude : 88.4550937
file name : Image_18042024143552526.png
|
2024-04-18 14:35:52.592787 |
145 |
94863156 |
Greywater management system |
470000 |
Greywater management system1 |
Roof laid |
-
latitude : 23.0677
Longitude : 88.45545666666666
file name : Image_18042024145558790.png
|
2024-04-18 14:55:58.85762 |
146 |
94863156 |
Greywater management system |
470000 |
Greywater management system1 |
Plinth level |
-
latitude : 23.067276666666665
Longitude : 88.45526166666666
file name : Image_18042024143738797.png
|
2024-04-18 14:37:38.868924 |
147 |
94863156 |
Greywater management system |
470000 |
Greywater management system1 |
Completion of work |
-
latitude : 23.067746666666668
Longitude : 88.45539666666667
file name : Image_10042024115632776.png
|
2024-04-10 11:56:32.84777 |
148 |
67860417 |
Use of LED buls/LED tubelights for street lights |
305755 |
Use of LED buls/LED tubelights for street lights1 |
Roof laid |
-
latitude : 23.0638401
Longitude : 88.4517933
file name : Image_08022024105155848.png
|
2024-02-08 10:51:55.930932 |
149 |
67860417 |
Use of LED buls/LED tubelights for street lights |
305755 |
Use of LED buls/LED tubelights for street lights1 |
Plinth level |
-
latitude : 23.068798333333334
Longitude : 88.455585
file name : Image_07022024112059223.png
|
2024-02-07 11:20:59.329888 |
150 |
67860417 |
Use of LED buls/LED tubelights for street lights |
305755 |
Use of LED buls/LED tubelights for street lights1 |
Completion of work |
-
latitude : 23.067380000000004
Longitude : 88.45637666666669
file name : Image_18012024110131583.png
|
2024-01-18 11:01:31.667625 |
151 |
59244111 |
CONSTRUCTION OF CONCRETE ROAD WITH PUCCA DRAIN FROM KESAB MALIK HOUSE TO KAMAKHYA MALIK LEDH AT HATI |
318837 |
CONSTRUCTION OF CONCRETE ROAD WITH PUCCA DRAIN FROM KESAB MALIK HOUSE TO KAMAKHYA MALIK LEDH AT HATI1 |
Roof laid |
-
latitude : 23.09653166666667,23.09653166666667
Longitude : 88.45670666666668,88.45670666666668
file name : Image_30112023105505194.png
|
2023-11-30 10:55:05.268487 |
152 |
59244111 |
CONSTRUCTION OF CONCRETE ROAD WITH PUCCA DRAIN FROM KESAB MALIK HOUSE TO KAMAKHYA MALIK LEDH AT HATI |
318837 |
CONSTRUCTION OF CONCRETE ROAD WITH PUCCA DRAIN FROM KESAB MALIK HOUSE TO KAMAKHYA MALIK LEDH AT HATI1 |
Plinth level |
-
latitude : 23.078671666666665,23.078674999999997
Longitude : 88.46241166666665,88.46240833333334
file name : Image_21112023102038302.png
|
2023-11-21 10:20:38.383156 |
153 |
59244111 |
CONSTRUCTION OF CONCRETE ROAD WITH PUCCA DRAIN FROM KESAB MALIK HOUSE TO KAMAKHYA MALIK LEDH AT HATI |
318837 |
CONSTRUCTION OF CONCRETE ROAD WITH PUCCA DRAIN FROM KESAB MALIK HOUSE TO KAMAKHYA MALIK LEDH AT HATI1 |
Plinth level |
-
latitude : 23.078736666666668,23.078736666666668
Longitude : 88.46223499999999,88.46223499999999
file name : Image_17102023160450157.png
|
2023-10-17 16:04:50.224704 |
154 |
59244111 |
CONSTRUCTION OF CONCRETE ROAD WITH PUCCA DRAIN FROM KESAB MALIK HOUSE TO KAMAKHYA MALIK LEDH AT HATI |
318837 |
CONSTRUCTION OF CONCRETE ROAD WITH PUCCA DRAIN FROM KESAB MALIK HOUSE TO KAMAKHYA MALIK LEDH AT HATI1 |
Plinth level |
-
latitude : 23.0785881,23.078715000000003
Longitude : 88.4626884,88.46230500000001
file name : Image_17102023104219145.png
|
2023-10-17 10:42:19.217916 |
155 |
59244111 |
CONSTRUCTION OF CONCRETE ROAD WITH PUCCA DRAIN FROM KESAB MALIK HOUSE TO KAMAKHYA MALIK LEDH AT HATI |
318837 |
CONSTRUCTION OF CONCRETE ROAD WITH PUCCA DRAIN FROM KESAB MALIK HOUSE TO KAMAKHYA MALIK LEDH AT HATI1 |
Completion of work |
-
latitude : 23.0785914,23.0785914
Longitude : 88.4626956,88.4626956
file name : Image_11102023101051371.png
|
2023-10-11 10:10:51.446373 |
156 |
67861499 |
Construction of roads |
68160 |
Construction of roads1 |
Roof laid |
-
latitude : 23.051178333333336,23.05118
Longitude : 88.43849666666668,88.438485
file name : Image_20122023103926589.png
|
2023-12-20 10:39:26.6641 |
157 |
67861499 |
Construction of roads |
68160 |
Construction of roads1 |
Plinth level |
-
latitude : 23.050964999999998,23.051009999999998
Longitude : 88.43872166666667,88.43873
file name : Image_18122023104646660.png
|
2023-12-18 10:46:46.725028 |
158 |
67861499 |
Construction of roads |
68160 |
Construction of roads1 |
Completion of work |
-
latitude : 23.0512604,23.0512604
Longitude : 88.438724,88.438724
file name : Image_25112023113335962.png
|
2023-11-25 11:33:36.02501 |
159 |
67870820 |
Drainage line for grey water |
215590 |
Drainage line for grey water1 |
Roof laid |
-
latitude : 23.05650166666667
Longitude : 88.43743833333335
file name : Image_18122023104642853.png
|
2023-12-18 10:46:42.91523 |
160 |
67870820 |
Drainage line for grey water |
215590 |
Drainage line for grey water1 |
Plinth level |
-
latitude : 23.056475
Longitude : 88.43777333333334
file name : Image_06122023104606648.png
|
2023-12-06 10:46:06.718364 |
161 |
67870820 |
Drainage line for grey water |
215590 |
Drainage line for grey water1 |
Completion of work |
-
latitude : 23.056475
Longitude : 88.437775
file name : Image_25112023113635503.png
|
2023-11-25 11:36:35.571903 |
162 |
98122106 |
Drainage Construction |
1000000 |
CONSTRUCTION OF PUCCA DRAIN WITH SOAKPIT AND NECESSARY RENOVATION AT GP |
Plinth level |
-
latitude : 23.0569575
Longitude : 88.4472404
file name : Image_06092024114614766.png
|
2024-09-06 11:46:14.832751 |
163 |
98122106 |
Drainage Construction |
1000000 |
CONSTRUCTION OF PUCCA DRAIN WITH SOAKPIT AND NECESSARY RENOVATION AT GP |
Completion of work |
-
latitude : 23.0569576
Longitude : 88.4472428
file name : Image_06092024114309396.png
|
2024-09-06 11:43:09.49116 |
164 |
67826354 |
Construction of roads |
197642 |
Construction of roads1 |
Roof laid |
-
latitude : 23.073068333333335,23.073068333333335
Longitude : 88.42541166666666,88.42541166666666
file name : Image_02022024103045971.png
|
2024-02-02 10:30:46.045796 |
165 |
67826354 |
Construction of roads |
197642 |
Construction of roads1 |
Plinth level |
-
latitude : 23.07306,23.07306
Longitude : 88.425295,88.425295
file name : Image_20122023103920411.png
|
2023-12-20 10:39:20.495659 |
166 |
67826354 |
Construction of roads |
197642 |
Construction of roads1 |
Completion of work |
-
latitude : 23.073013333333332,23.073013333333332
Longitude : 88.42524499999999,88.42524499999999
file name : Image_18122023105528072.png
|
2023-12-18 10:55:28.143848 |
167 |
70883043 |
Creation of drainage channel for management of grey water |
574373 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.069815000000002
Longitude : 88.45746
file name : Image_08042024180559304.png
|
2024-04-08 18:05:59.37482 |
168 |
70883043 |
Creation of drainage channel for management of grey water |
574373 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.069779999999998
Longitude : 88.45750833333335
file name : Image_19012024112435161.png
|
2024-01-19 11:24:35.231405 |
169 |
70883043 |
Creation of drainage channel for management of grey water |
574373 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.06980666666667
Longitude : 88.45752499999999
file name : Image_18012024105442630.png
|
2024-01-18 10:54:42.732052 |
170 |
67861222 |
Construction of roads |
275215 |
Construction of roads1 |
Roof laid |
-
latitude : 23.096619999999998,23.096619999999998
Longitude : 88.45684166666666,88.45684166666666
file name : Image_20022024103937017.png
|
2024-02-20 10:39:37.080994 |
171 |
67861222 |
Construction of roads |
275215 |
Construction of roads1 |
Plinth level |
-
latitude : 23.055004999999998,23.055003333333335
Longitude : 88.44242333333335,88.44242666666666
file name : Image_24012024101131506.png
|
2024-01-24 10:11:31.571509 |
172 |
67861222 |
Construction of roads |
275215 |
Construction of roads1 |
Completion of work |
-
latitude : 23.054993333333332,23.05499166666667
Longitude : 88.44241666666667,88.44241833333332
file name : Image_20122023104808073.png
|
2023-12-20 10:48:08.153803 |
173 |
67860580 |
Use of LED buls/LED tubelights for street lights |
162675 |
Use of LED buls/LED tubelights for street lights1 |
Roof laid |
-
latitude : 23.08461833333333
Longitude : 88.461865
file name : Image_19012024172935751.png
|
2024-01-19 17:29:35.820977 |
174 |
67860580 |
Use of LED buls/LED tubelights for street lights |
162675 |
Use of LED buls/LED tubelights for street lights1 |
Plinth level |
-
latitude : 23.0845026
Longitude : 88.4648863
file name : Image_19012024110418310.png
|
2024-01-19 11:04:18.387436 |
175 |
67860580 |
Use of LED buls/LED tubelights for street lights |
162675 |
Use of LED buls/LED tubelights for street lights1 |
Completion of work |
-
latitude : 23.08456833333333
Longitude : 88.46203333333332
file name : Image_18012024104757131.png
|
2024-01-18 10:47:57.20586 |
176 |
67860580 |
Use of LED buls/LED tubelights for street lights |
162675 |
Use of LED buls/LED tubelights for street lights1 |
Completion of work |
-
latitude : 23.0854852
Longitude : 88.4625456
file name : Image_27122023101538868.png
|
2023-12-27 10:15:38.931556 |
177 |
67826197 |
Construction of roads |
191167 |
Construction of roads1 |
Roof laid |
-
latitude : 23.096574999999998,23.096574999999998
Longitude : 88.45685166666665,88.45685166666665
file name : Image_30012024100805906.png
|
2024-01-30 10:08:05.981571 |
178 |
67826197 |
Construction of roads |
191167 |
Construction of roads1 |
Plinth level |
-
latitude : 23.085066666666663,23.085061666666668
Longitude : 88.44552166666666,88.44551500000001
file name : Image_25012024102443209.png
|
2024-01-25 10:24:43.292531 |
179 |
67826197 |
Construction of roads |
191167 |
Construction of roads1 |
Completion of work |
-
latitude : 23.096545,23.085203333333332
Longitude : 88.45664666666669,88.44562666666667
file name : Image_18012024102759819.png
|
2024-01-18 10:27:59.881323 |
180 |
67860683 |
Use of LED buls/LED tubelights for street lights |
299480 |
STREET LIGHT AT HATIKANDA |
Roof laid |
-
latitude : 23.0777951
Longitude : 88.4611802
file name : Image_10042024115451975.png
|
2024-04-10 11:54:52.037509 |
181 |
67860683 |
Use of LED buls/LED tubelights for street lights |
299480 |
STREET LIGHT AT HATIKANDA |
Plinth level |
-
latitude : 23.07754
Longitude : 88.46209833333333
file name : Image_02042024140915874.png
|
2024-04-02 14:09:15.961716 |
182 |
67860683 |
Use of LED buls/LED tubelights for street lights |
299480 |
STREET LIGHT AT HATIKANDA |
Completion of work |
-
latitude : 23.0784772
Longitude : 88.4610954
file name : Image_29022024103510744.png
|
2024-02-29 10:35:10.868042 |
183 |
67828689 |
Solar Street Lighting Installation |
299480 |
STREET LIGHT FROM AJIT MONDAL HOUSE TO ABODH GHOSH HOUSE AT MUKTARPUR |
Roof laid |
-
latitude : 23.060309999999998
Longitude : 88.44915166666667
file name : Image_08042024173100397.png
|
2024-04-08 17:31:00.483498 |
184 |
67828689 |
Solar Street Lighting Installation |
299480 |
STREET LIGHT FROM AJIT MONDAL HOUSE TO ABODH GHOSH HOUSE AT MUKTARPUR |
Plinth level |
-
latitude : 23.057031666666663
Longitude : 88.44729166666666
file name : Image_02042024140300494.png
|
2024-04-02 14:03:00.58214 |
185 |
67828689 |
Solar Street Lighting Installation |
299480 |
STREET LIGHT FROM AJIT MONDAL HOUSE TO ABODH GHOSH HOUSE AT MUKTARPUR |
Completion of work |
-
latitude : 23.060225
Longitude : 88.44942
file name : Image_29022024104642239.png
|
2024-02-29 10:46:42.309722 |
186 |
67860793 |
Use of LED buls/LED tubelights for street lights |
299480 |
STREET LIGHT AT HAMJANPUR |
Roof laid |
-
latitude : 23.097935
Longitude : 88.45678000000001
file name : Image_19042024104708134.png
|
2024-04-19 10:47:07.652549 |
187 |
67860793 |
Use of LED buls/LED tubelights for street lights |
299480 |
STREET LIGHT AT HAMJANPUR |
Plinth level |
-
latitude : 23.0570289
Longitude : 88.4473116
file name : Image_05042024144702152.png
|
2024-04-05 14:47:02.220165 |
188 |
67860793 |
Use of LED buls/LED tubelights for street lights |
299480 |
STREET LIGHT AT HAMJANPUR |
Completion of work |
-
latitude : 23.074725
Longitude : 88.439194
file name : Image_10032024101638781.png
|
2024-03-10 10:16:38.864675 |
189 |
94844747 |
Greywater management system |
82816 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT UTTARGOPALPUR |
Roof laid |
-
latitude : 23.084846666666667
Longitude : 88.46654166666667
file name : Image_24062024173244972.png
|
2024-06-24 17:32:45.046911 |
190 |
94844747 |
Greywater management system |
82816 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT UTTARGOPALPUR |
Plinth level |
-
latitude : 23.0845685
Longitude : 88.4663192
file name : Image_14062024175115406.png
|
2024-06-14 17:51:15.479165 |
191 |
94844747 |
Greywater management system |
82816 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT UTTARGOPALPUR |
Completion of work |
-
latitude : 23.0849212
Longitude : 88.4666777
file name : Image_07062024111501212.png
|
2024-06-07 11:15:01.274832 |
192 |
94845529 |
Greywater management system |
42276 |
Greywater management system1 |
Roof laid |
-
latitude : 23.084846666666667
Longitude : 88.46651666666666
file name : Image_24062024173337730.png
|
2024-06-24 17:33:37.793448 |
193 |
94845529 |
Greywater management system |
42276 |
Greywater management system1 |
Plinth level |
-
latitude : 23.084501666666664
Longitude : 88.46819500000001
file name : Image_14062024174823880.png
|
2024-06-14 17:48:23.94373 |
194 |
94845529 |
Greywater management system |
42276 |
Greywater management system1 |
Completion of work |
-
latitude : 23.08443666666667
Longitude : 88.46821
file name : Image_07062024112206280.png
|
2024-06-07 11:22:06.353024 |
195 |
94855015 |
Greywater management system |
393376 |
CONSTRUCTION OF PLATFORM DRAIN AND SOAKPIT AT BARAIL |
Roof laid |
-
latitude : 23.084755000000005
Longitude : 88.44983333333333
file name : Image_12072024180607041.png
|
2024-07-12 18:06:05.198489 |
196 |
94855015 |
Greywater management system |
393376 |
CONSTRUCTION OF PLATFORM DRAIN AND SOAKPIT AT BARAIL |
Plinth level |
-
latitude : 23.08476333333333
Longitude : 88.44981333333332
file name : Image_08072024102718418.png
|
2024-07-08 10:27:18.474311 |
197 |
94855015 |
Greywater management system |
393376 |
CONSTRUCTION OF PLATFORM DRAIN AND SOAKPIT AT BARAIL |
Plinth level |
-
latitude : 23.08476333333333
Longitude : 88.44981333333332
file name : Image_08072024102712992.png
|
2024-07-08 10:27:13.048748 |
198 |
94855015 |
Greywater management system |
393376 |
CONSTRUCTION OF PLATFORM DRAIN AND SOAKPIT AT BARAIL |
Completion of work |
-
latitude : 23.084744999999998
Longitude : 88.44982166666665
file name : Image_24062024175457290.png
|
2024-06-24 17:54:57.353705 |
199 |
67696348 |
Creation of drainage channel for management of grey water |
487415 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.0628836
Longitude : 88.4474052
file name : Image_23032024144133138.png
|
2024-03-23 14:41:33.192232 |
200 |
67696348 |
Creation of drainage channel for management of grey water |
487415 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.0631739
Longitude : 88.4477351
file name : Image_27072023172027609.png
|
2023-07-27 17:20:27.701982 |
201 |
67696348 |
Creation of drainage channel for management of grey water |
487415 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.063190000000002
Longitude : 88.44665000000002
file name : Image_25072023172421020.png
|
2023-07-25 17:24:21.096312 |
202 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Roof laid |
-
latitude : 23.059398333333334
Longitude : 88.45003999999999
file name : Image_09072024173144097.png
|
2024-07-09 17:31:44.158881 |
203 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Plinth level |
-
latitude : 23.059416666666667
Longitude : 88.44989500000001
file name : Image_24062024165852413.png
|
2024-06-24 16:58:52.470952 |
204 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Completion of work |
-
latitude : 23.059956666666668
Longitude : 88.44911166666667
file name : Image_11062024113238956.png
|
2024-06-11 11:32:39.028235 |
205 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Roof laid |
-
latitude : 23.058045
Longitude : 88.45108
file name : Image_09072024173740280.png
|
2024-07-09 17:37:40.335108 |
206 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Plinth level |
-
latitude : 23.05806
Longitude : 88.45110500000001
file name : Image_24062024170134778.png
|
2024-06-24 17:01:34.84075 |
207 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Completion of work |
-
latitude : 23.05805666666667
Longitude : 88.45109666666667
file name : Image_14062024174255638.png
|
2024-06-14 17:42:55.704412 |
208 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Roof laid |
-
latitude : 23.060055000000002
Longitude : 88.45169
file name : Image_09072024173819054.png
|
2024-07-09 17:38:19.108335 |
209 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Plinth level |
-
latitude : 23.060065
Longitude : 88.45169666666668
file name : Image_24062024170513919.png
|
2024-06-24 17:05:13.98017 |
210 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Completion of work |
-
latitude : 23.060065
Longitude : 88.45168666666665
file name : Image_14062024174305011.png
|
2024-06-14 17:43:05.070902 |
211 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Roof laid |
-
latitude : 23.060005
Longitude : 88.44908500000001
file name : Image_09072024172851651.png
|
2024-07-09 17:28:51.70405 |
212 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Plinth level |
-
latitude : 23.060040000000004
Longitude : 88.44909833333334
file name : Image_24062024165600271.png
|
2024-06-24 16:56:00.331543 |
213 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Completion of work |
-
latitude : 23.060056666666664
Longitude : 88.449095
file name : Image_14062024174313299.png
|
2024-06-14 17:43:13.365366 |
214 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Roof laid |
-
latitude : 23.059998333333336
Longitude : 88.44911333333333
file name : Image_10092024161056034.png
|
2024-09-10 16:10:59.553819 |
215 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Plinth level |
-
latitude : 23.0607362
Longitude : 88.4494701
file name : Image_10092024160422418.png
|
2024-09-10 16:04:25.927988 |
216 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Completion of work |
-
latitude : 23.059983333333335
Longitude : 88.44913833333334
file name : Image_10092024155639332.png
|
2024-09-10 15:56:42.844588 |
217 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Roof laid |
-
latitude : 23.060013333333337
Longitude : 88.44910666666668
file name : Image_10092024161026662.png
|
2024-09-10 16:10:30.176123 |
218 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Plinth level |
-
latitude : 23.06000333333333
Longitude : 88.44912166666667
file name : Image_10092024160455306.png
|
2024-09-10 16:04:58.826222 |
219 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Completion of work |
-
latitude : 23.0607382
Longitude : 88.4494734
file name : Image_10092024155719394.png
|
2024-09-10 15:57:22.911133 |
220 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Roof laid |
-
latitude : 23.060008333333332
Longitude : 88.449095
file name : Image_10092024161000573.png
|
2024-09-10 16:10:04.093042 |
221 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Plinth level |
-
latitude : 23.059981666666665
Longitude : 88.44910166666665
file name : Image_10092024160525765.png
|
2024-09-10 16:05:29.284245 |
222 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Completion of work |
-
latitude : 23.0607268
Longitude : 88.449317
file name : Image_10092024155751020.png
|
2024-09-10 15:57:54.524387 |
223 |
94856067 |
Greywater management system |
200811 |
CONSTRUCTION OF SILT CHAMBER AND VERTICAL CHAMBER AT BARAIL |
Roof laid |
-
latitude : 23.072488333333332
Longitude : 88.45923499999999
file name : Image_12072024180506567.png
|
2024-07-12 18:05:06.623549 |
224 |
94856067 |
Greywater management system |
200811 |
CONSTRUCTION OF SILT CHAMBER AND VERTICAL CHAMBER AT BARAIL |
Plinth level |
-
latitude : 23.084765
Longitude : 88.44980500000001
file name : Image_08072024102708826.png
|
2024-07-08 10:27:08.880368 |
225 |
94856067 |
Greywater management system |
200811 |
CONSTRUCTION OF SILT CHAMBER AND VERTICAL CHAMBER AT BARAIL |
Completion of work |
-
latitude : 23.084723333333333
Longitude : 88.44980333333334
file name : Image_24062024175310481.png
|
2024-06-24 17:53:10.543472 |
226 |
94860825 |
Greywater management system |
116259 |
CONSTRUCTION OF VERTICAL FILTER CHAMBER AT MUKTARPUR |
Roof laid |
-
latitude : 23.06005
Longitude : 88.449095
file name : Image_09072024173010564.png
|
2024-07-09 17:30:10.620301 |
227 |
94860825 |
Greywater management system |
116259 |
CONSTRUCTION OF VERTICAL FILTER CHAMBER AT MUKTARPUR |
Plinth level |
-
latitude : 23.060043333333336
Longitude : 88.44908833333332
file name : Image_24062024165709455.png
|
2024-06-24 16:57:09.518186 |
228 |
94860825 |
Greywater management system |
116259 |
CONSTRUCTION OF VERTICAL FILTER CHAMBER AT MUKTARPUR |
Completion of work |
-
latitude : 23.060041666666667
Longitude : 88.44913666666667
file name : Image_14062024174319765.png
|
2024-06-14 17:43:19.825855 |
229 |
67860906 |
Construction of roads |
360000 |
CONSTRUCTION OF CONCRETE ROAD FROM MAHADEB MALO HOUSE TO BRICK FIELD AT SIJA |
Roof laid |
-
latitude : 23.0499465,23.0499373
Longitude : 88.4443044,88.4444712
file name : Image_19072024105037243.png
|
2024-07-19 10:50:37.294951 |
230 |
67860906 |
Construction of roads |
360000 |
CONSTRUCTION OF CONCRETE ROAD FROM MAHADEB MALO HOUSE TO BRICK FIELD AT SIJA |
Plinth level |
-
latitude : 23.0499417,23.0500317
Longitude : 88.4444382,88.4443521
file name : Image_08072024105309763.png
|
2024-07-08 10:53:09.812773 |
231 |
67860906 |
Construction of roads |
360000 |
CONSTRUCTION OF CONCRETE ROAD FROM MAHADEB MALO HOUSE TO BRICK FIELD AT SIJA |
Completion of work |
-
latitude : 23.0502478,23.0500332
Longitude : 88.4444079,88.4442441
file name : Image_28062024113253518.png
|
2024-06-28 11:32:53.573302 |
232 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Roof laid |
-
latitude : 23.0607288
Longitude : 88.4493407
file name : Image_10092024160930105.png
|
2024-09-10 16:09:33.620132 |
233 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Plinth level |
-
latitude : 23.059981666666665
Longitude : 88.44910166666665
file name : Image_10092024160553674.png
|
2024-09-10 16:05:57.201836 |
234 |
89974298 |
Drinking water facilities/ Installation of RO/ Water Filter |
227744 |
CONSTRUCTION OF PLATFORM WITH SOAKPIT AT EXISTING TUBEWELL |
Completion of work |
-
latitude : 23.0607395
Longitude : 88.4492565
file name : Image_10092024155826070.png
|
2024-09-10 15:58:29.580137 |
235 |
94832892 |
Greywater management system |
305100 |
CONSTRUCTION OF FILTER CHAMBER AT DISCHARGE POINT OF DRAIN AT RUKESHPUR IMIS VILLAGE |
Plinth level |
-
latitude : 23.072283333333335
Longitude : 88.46107666666667
file name : Image_26092024110521916.png
|
2024-09-26 11:05:21.99377 |
236 |
94832892 |
Greywater management system |
305100 |
CONSTRUCTION OF FILTER CHAMBER AT DISCHARGE POINT OF DRAIN AT RUKESHPUR IMIS VILLAGE |
Completion of work |
-
latitude : 23.072259999999996
Longitude : 88.46108166666666
file name : Image_26092024105729370.png
|
2024-09-26 10:57:29.436367 |
237 |
94854148 |
Greywater management system |
158535 |
CONSTRUCTION OF SILT CHAMBER AND VERTICAL FILTER CHAMBER AT RUKESHPUR IMIS VILLAGE |
Roof laid |
-
latitude : 23.0750847
Longitude : 88.4610978
file name : Image_07082024180355857.png
|
2024-08-07 18:03:55.922827 |
238 |
94854148 |
Greywater management system |
158535 |
CONSTRUCTION OF SILT CHAMBER AND VERTICAL FILTER CHAMBER AT RUKESHPUR IMIS VILLAGE |
Plinth level |
-
latitude : 23.074991666666666
Longitude : 88.46124833333333
file name : Image_16072024120234124.png
|
2024-07-16 12:02:34.187418 |
239 |
94854148 |
Greywater management system |
158535 |
CONSTRUCTION OF SILT CHAMBER AND VERTICAL FILTER CHAMBER AT RUKESHPUR IMIS VILLAGE |
Completion of work |
-
latitude : 23.0750381
Longitude : 88.4610813
file name : Image_13072024130930946.png
|
2024-07-13 13:09:31.012748 |
240 |
94853208 |
Greywater management system |
310560 |
CONSTRUCTION OF TUBEWELL PLATFORM AND SOAKPIT AT RUKESHPUR IMIS VILLAGE |
Roof laid |
-
latitude : 23.075015
Longitude : 88.46131333333332
file name : Image_07082024180525347.png
|
2024-08-07 18:05:25.412694 |
241 |
94853208 |
Greywater management system |
310560 |
CONSTRUCTION OF TUBEWELL PLATFORM AND SOAKPIT AT RUKESHPUR IMIS VILLAGE |
Plinth level |
-
latitude : 23.074991666666666
Longitude : 88.46124833333333
file name : Image_16072024120342242.png
|
2024-07-16 12:03:42.302855 |
242 |
94853208 |
Greywater management system |
310560 |
CONSTRUCTION OF TUBEWELL PLATFORM AND SOAKPIT AT RUKESHPUR IMIS VILLAGE |
Completion of work |
-
latitude : 23.075039
Longitude : 88.4610861
file name : Image_13072024131120416.png
|
2024-07-13 13:11:20.486469 |
243 |
68368218 |
Infrastructure and training on solid and liquid waste management |
1400000 |
CONSTRUCTION OF SOLID WASTE MANAGEMENT UNIT AT DHAKCHARA |
Roof laid |
-
latitude : 23.07135333333333
Longitude : 88.42439666666665
file name : Image_06082024184503048.png
|
2024-08-06 18:45:03.22232 |
244 |
68368218 |
Infrastructure and training on solid and liquid waste management |
1400000 |
CONSTRUCTION OF SOLID WASTE MANAGEMENT UNIT AT DHAKCHARA |
Plinth level |
-
latitude : 23.071358333333333
Longitude : 88.42438500000002
file name : Image_25072024124503991.png
|
2024-07-25 12:45:04.063032 |
245 |
68368218 |
Infrastructure and training on solid and liquid waste management |
1400000 |
CONSTRUCTION OF SOLID WASTE MANAGEMENT UNIT AT DHAKCHARA |
Completion of work |
-
latitude : 23.071341666666665
Longitude : 88.4244
file name : Image_25072024123055861.png
|
2024-07-25 12:30:55.948857 |
246 |
68897691 |
Any other operation and maintenance needs related to solid waste management |
220000 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 23.071419999999996
Longitude : 88.424405
file name : Image_06082024184507048.png
|
2024-08-06 18:45:07.120521 |
247 |
68897691 |
Any other operation and maintenance needs related to solid waste management |
220000 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 23.071419999999996
Longitude : 88.424405
file name : Image_06082024184517504.png
|
2024-08-06 18:45:17.574656 |
248 |
68897691 |
Any other operation and maintenance needs related to solid waste management |
220000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 23.07135166666667
Longitude : 88.424375
file name : Image_25072024124605890.png
|
2024-07-25 12:46:05.957036 |
249 |
68897691 |
Any other operation and maintenance needs related to solid waste management |
220000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 23.0728845
Longitude : 88.4256968
file name : Image_25072024123222946.png
|
2024-07-25 12:32:23.025948 |
250 |
89678344 |
Repair of pipe drinking water |
1500000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 23.0569513
Longitude : 88.4472355
file name : Image_19092024124900696.png
|
2024-09-19 12:49:00.77538 |
251 |
89678344 |
Repair of pipe drinking water |
1500000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 23.0569688
Longitude : 88.4472227
file name : Image_23072024134009098.png
|
2024-07-23 13:40:09.168814 |
252 |
94860581 |
Greywater management system |
147966 |
CONSTRUCTION OF VERTICAL FILTER CHAMBER AND SILT CHAMBER AT KAMALPUR |
Roof laid |
-
latitude : 23.056165000000004
Longitude : 88.43673666666668
file name : Image_07082024150350684.png
|
2024-08-07 15:03:50.804938 |
253 |
94860581 |
Greywater management system |
147966 |
CONSTRUCTION OF VERTICAL FILTER CHAMBER AND SILT CHAMBER AT KAMALPUR |
Plinth level |
-
latitude : 23.05622
Longitude : 88.43675666666668
file name : Image_06082024184524429.png
|
2024-08-06 18:45:24.495023 |
254 |
94860581 |
Greywater management system |
147966 |
CONSTRUCTION OF VERTICAL FILTER CHAMBER AND SILT CHAMBER AT KAMALPUR |
Plinth level |
-
latitude : 23.05622
Longitude : 88.43675666666668
file name : Image_06082024184514048.png
|
2024-08-06 18:45:14.106864 |
255 |
94860581 |
Greywater management system |
147966 |
CONSTRUCTION OF VERTICAL FILTER CHAMBER AND SILT CHAMBER AT KAMALPUR |
Completion of work |
-
latitude : 23.056300000000004
Longitude : 88.43677666666666
file name : Image_06082024165544691.png
|
2024-08-06 16:55:44.807253 |
256 |
94860581 |
Greywater management system |
147966 |
CONSTRUCTION OF VERTICAL FILTER CHAMBER AND SILT CHAMBER AT KAMALPUR |
Completion of work |
-
latitude : 23.056268333333332
Longitude : 88.43673666666668
file name : Image_02082024131737303.png
|
2024-08-02 13:17:37.383101 |
257 |
94860020 |
Greywater management system |
289856 |
CONSTRUCTION OF TUBEWELL PLATFORM AND SOAKPIT AT KAMALPUR |
Roof laid |
-
latitude : 23.056171666666668
Longitude : 88.43673500000001
file name : Image_07082024150347316.png
|
2024-08-07 15:03:47.391493 |
258 |
94860020 |
Greywater management system |
289856 |
CONSTRUCTION OF TUBEWELL PLATFORM AND SOAKPIT AT KAMALPUR |
Plinth level |
-
latitude : 23.05621833333333
Longitude : 88.43676333333333
file name : Image_06082024184521103.png
|
2024-08-06 18:45:21.163646 |
259 |
94860020 |
Greywater management system |
289856 |
CONSTRUCTION OF TUBEWELL PLATFORM AND SOAKPIT AT KAMALPUR |
Plinth level |
-
latitude : 23.05621833333333
Longitude : 88.43676333333333
file name : Image_06082024184510597.png
|
2024-08-06 18:45:10.656236 |
260 |
94860020 |
Greywater management system |
289856 |
CONSTRUCTION OF TUBEWELL PLATFORM AND SOAKPIT AT KAMALPUR |
Completion of work |
-
latitude : 23.05622166666667
Longitude : 88.43675499999999
file name : Image_06082024165638276.png
|
2024-08-06 16:56:38.336115 |
261 |
94860020 |
Greywater management system |
289856 |
CONSTRUCTION OF TUBEWELL PLATFORM AND SOAKPIT AT KAMALPUR |
Completion of work |
-
latitude : 23.056258333333336
Longitude : 88.43675666666668
file name : Image_02082024131750448.png
|
2024-08-02 13:17:50.5242 |
262 |
94860020 |
Greywater management system |
289856 |
CONSTRUCTION OF TUBEWELL PLATFORM AND SOAKPIT AT KAMALPUR |
Completion of work |
-
latitude : 23.056258333333336
Longitude : 88.43675666666668
file name : Image_02082024131743116.png
|
2024-08-02 13:17:43.186907 |
263 |
94859236 |
Greywater management system |
73983 |
CONSTRUCTION OF SILT CHAMBER AND VERTICAL FILTER CHAMBER AT GOURNAI |
Roof laid |
-
latitude : 23.0767468
Longitude : 88.439934
file name : Image_06082024174521889.png
|
2024-08-06 17:45:21.951571 |
264 |
94859236 |
Greywater management system |
73983 |
CONSTRUCTION OF SILT CHAMBER AND VERTICAL FILTER CHAMBER AT GOURNAI |
Plinth level |
-
latitude : 23.075068333333334
Longitude : 88.43060166666667
file name : Image_06082024173810576.png
|
2024-08-06 17:38:10.642789 |
265 |
94859236 |
Greywater management system |
73983 |
CONSTRUCTION OF SILT CHAMBER AND VERTICAL FILTER CHAMBER AT GOURNAI |
Completion of work |
-
latitude : 23.075081666666666
Longitude : 88.43058
file name : Image_06082024172609293.png
|
2024-08-06 17:26:09.360808 |
266 |
94858375 |
Greywater management system |
144928 |
CONSTRUCTION OF TUBEWELL PLATFORM AND SOAKPIT AT GOURNAI |
Roof laid |
-
latitude : 23.07505666666667
Longitude : 88.43056999999999
file name : Image_06082024174435227.png
|
2024-08-06 17:44:35.293396 |
267 |
94858375 |
Greywater management system |
144928 |
CONSTRUCTION OF TUBEWELL PLATFORM AND SOAKPIT AT GOURNAI |
Plinth level |
-
latitude : 23.075066666666665
Longitude : 88.43054666666667
file name : Image_06082024173706823.png
|
2024-08-06 17:37:06.892487 |
268 |
94858375 |
Greywater management system |
144928 |
CONSTRUCTION OF TUBEWELL PLATFORM AND SOAKPIT AT GOURNAI |
Completion of work |
-
latitude : 23.075066666666665
Longitude : 88.43053666666668
file name : Image_06082024172620704.png
|
2024-08-06 17:26:20.775161 |
269 |
94858375 |
Greywater management system |
144928 |
CONSTRUCTION OF TUBEWELL PLATFORM AND SOAKPIT AT GOURNAI |
Completion of work |
-
latitude : 23.075066666666665
Longitude : 88.43053666666668
file name : Image_06082024172615081.png
|
2024-08-06 17:26:15.1521 |
270 |
94848582 |
Greywater management system |
73983 |
CONSTRUCTION OF SILT CHAMBER AND VERTICAL FILTER CHAMBER AT HATIKANDA |
Roof laid |
-
latitude : 23.0777809
Longitude : 88.4611539
file name : Image_13082024103212892.png
|
2024-08-13 10:32:12.965274 |
271 |
94848582 |
Greywater management system |
73983 |
CONSTRUCTION OF SILT CHAMBER AND VERTICAL FILTER CHAMBER AT HATIKANDA |
Plinth level |
-
latitude : 23.077834999999997
Longitude : 88.46149333333332
file name : Image_13082024102526352.png
|
2024-08-13 10:25:26.41475 |
272 |
94848582 |
Greywater management system |
73983 |
CONSTRUCTION OF SILT CHAMBER AND VERTICAL FILTER CHAMBER AT HATIKANDA |
Completion of work |
-
latitude : 23.0778003
Longitude : 88.4611269
file name : Image_13082024101556262.png
|
2024-08-13 10:15:56.328544 |
273 |
94910867 |
Greywater management system |
144928 |
CONSTRUCTION OF TUBEWELL PLATFORM AND SOAKPIT AT HATIKANDA |
Roof laid |
-
latitude : 23.0777611
Longitude : 88.4611609
file name : Image_13082024103106561.png
|
2024-08-13 10:31:06.635442 |
274 |
94910867 |
Greywater management system |
144928 |
CONSTRUCTION OF TUBEWELL PLATFORM AND SOAKPIT AT HATIKANDA |
Plinth level |
-
latitude : 23.0777611
Longitude : 88.4611609
file name : Image_13082024102621842.png
|
2024-08-13 10:26:21.910897 |
275 |
94910867 |
Greywater management system |
144928 |
CONSTRUCTION OF TUBEWELL PLATFORM AND SOAKPIT AT HATIKANDA |
Completion of work |
-
latitude : 23.0777736
Longitude : 88.4611469
file name : Image_13082024101648985.png
|
2024-08-13 10:16:49.051595 |