1 |
67157384 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.908801
Longitude : 88.3819364
file name : Image_13032023154145812.png
|
2023-03-13 15:41:45.899117 |
2 |
67157384 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.9103855
Longitude : 88.3827364
file name : Image_13032023153635208.png
|
2023-03-13 15:36:35.294625 |
3 |
67157384 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.9104086
Longitude : 88.3827014
file name : Image_13032023153745298.png
|
2023-03-13 15:37:45.38636 |
4 |
67157384 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.9088088
Longitude : 88.3819417
file name : Image_13032023153243844.png
|
2023-03-13 15:32:43.947242 |
5 |
34938186 |
Construction of Concrite Drain from Pikai house to Suresh Prasad house 1ST PHASE |
354648 |
Construction of Concrite Drain from Pikai house to Suresh Prasad house 1ST PHASE1 |
Completion of work |
-
latitude : 22.9008905,22.901342
Longitude : 88.3778755,88.3775314
file name : Image_08112021102454688.png
|
2021-11-08 10:24:54.779971 |
6 |
34938186 |
Construction of Concrite Drain from Pikai house to Suresh Prasad house 1ST PHASE |
354648 |
Construction of Concrite Drain from Pikai house to Suresh Prasad house 1ST PHASE1 |
Completion of work |
-
latitude : 22.90131333333333,22.900964999999996
Longitude : 88.37673166666667,88.37821000000001
file name : Image_02112021094121137.png
|
2021-11-02 09:41:21.247423 |
7 |
34938186 |
Construction of Concrite Drain from Pikai house to Suresh Prasad house 1ST PHASE |
354648 |
Construction of Concrite Drain from Pikai house to Suresh Prasad house 1ST PHASE1 |
Completion of work |
-
latitude : 22.9061995,22.9061995
Longitude : 88.3709045,88.3709045
file name : Image_29102021102711318.png
|
2021-10-29 10:27:11.412763 |
8 |
34963220 |
Maintenance of Electrical poll tapping street light with Led at Different Sansad under Gp area |
2394165 |
Maintenance of Electrical poll tapping street light with Led at Different Sansad under Gp area1 |
Completion of work |
-
latitude : 22.8991679
Longitude : 88.3767071
file name : Image_23072021115432045.png
|
2021-07-23 11:54:32.153647 |
9 |
34963220 |
Maintenance of Electrical poll tapping street light with Led at Different Sansad under Gp area |
2394165 |
Maintenance of Electrical poll tapping street light with Led at Different Sansad under Gp area1 |
Completion of work |
-
latitude : 22.909047
Longitude : 88.3819722
file name : Image_01062021155727307.png
|
2021-06-01 15:57:27.422429 |
10 |
34963220 |
Maintenance of Electrical poll tapping street light with Led at Different Sansad under Gp area |
2394165 |
Maintenance of Electrical poll tapping street light with Led at Different Sansad under Gp area1 |
Completion of work |
-
latitude : 22.9090403
Longitude : 88.3819747
file name : Image_01062021155731992.png
|
2021-06-01 15:57:32.117702 |
11 |
34866193 |
CC Road from Debashish Das to Sukumar Karmakar |
192301 |
CC Road from Debashish Das to Sukumar Karmakar 1 |
Completion of work |
-
latitude : 22.908604999999998,22.9002167
Longitude : 88.370705,88.3765582
file name : Image_22012022150215357.png
|
2022-01-22 15:02:15.452384 |
12 |
34866193 |
CC Road from Debashish Das to Sukumar Karmakar |
192301 |
CC Road from Debashish Das to Sukumar Karmakar 1 |
Completion of work |
-
latitude : 22.901470000000003,22.908411666666666
Longitude : 88.37700333333332,88.37096500000001
file name : Image_22012022122142610.png
|
2022-01-22 12:21:42.700749 |
13 |
34866193 |
CC Road from Debashish Das to Sukumar Karmakar |
192301 |
CC Road from Debashish Das to Sukumar Karmakar 1 |
Completion of work |
-
latitude : 22.9008865,22.9008865,22.900930000000002
Longitude : 88.3769255,88.3769255,88.37685000000002
file name : Image_14012022122312513.png
|
2022-01-14 12:23:12.604423 |
14 |
34866193 |
CC Road from Debashish Das to Sukumar Karmakar |
192301 |
CC Road from Debashish Das to Sukumar Karmakar 1 |
Completion of work |
-
latitude : 22.9088345,22.9088076
Longitude : 88.3819375,88.3819464
file name : Image_14012022133337350.png
|
2022-01-14 13:33:37.445649 |
15 |
34917184 |
CC Road Swapan Biswas to Lakshan Biswas |
57940 |
CC Road Swapan Biswas to Lakshan Biswas1 |
Completion of work |
-
latitude : 22.9010453,22.9010452
Longitude : 88.3786273,88.3786269
file name : Image_08112021101811410.png
|
2021-11-08 10:18:11.512658 |
16 |
34917184 |
CC Road Swapan Biswas to Lakshan Biswas |
57940 |
CC Road Swapan Biswas to Lakshan Biswas1 |
Completion of work |
-
latitude : 22.9010435,22.9010417
Longitude : 88.3786241,88.3786202
file name : Image_08112021102004029.png
|
2021-11-08 10:20:04.13165 |
17 |
34917184 |
CC Road Swapan Biswas to Lakshan Biswas |
57940 |
CC Road Swapan Biswas to Lakshan Biswas1 |
Completion of work |
-
latitude : 22.900991666666663,22.901083333333336
Longitude : 88.37826666666666,88.37827333333334
file name : Image_02112021094234482.png
|
2021-11-02 09:42:34.591639 |
18 |
34917184 |
CC Road Swapan Biswas to Lakshan Biswas |
57940 |
CC Road Swapan Biswas to Lakshan Biswas1 |
Completion of work |
-
latitude : 22.9062004,22.9062009
Longitude : 88.3709061,88.3709065
file name : Image_29102021102142018.png
|
2021-10-29 10:21:42.11606 |
19 |
34951040 |
Cleaining of Kuchcha Drain and sludge in existing drain at Sansad V |
142870 |
Cleaining of Kuchcha Drain and sludge in existing drain at Sansad V1 |
Completion of work |
-
latitude : 22.9006359,22.90061
Longitude : 88.3765605,88.3765379
file name : Image_21072021112432730.png
|
2021-07-21 11:24:32.805805 |
20 |
34951040 |
Cleaining of Kuchcha Drain and sludge in existing drain at Sansad V |
142870 |
Cleaining of Kuchcha Drain and sludge in existing drain at Sansad V1 |
Completion of work |
-
latitude : 22.90306666666667,22.909839
Longitude : 88.38004833333335,88.3821842
file name : Image_20072021132109915.png
|
2021-07-20 13:21:10.0159 |
21 |
34951040 |
Cleaining of Kuchcha Drain and sludge in existing drain at Sansad V |
142870 |
Cleaining of Kuchcha Drain and sludge in existing drain at Sansad V1 |
Completion of work |
-
latitude : 22.906330000000004,22.906211666666664
Longitude : 88.37131166666668,88.37145000000001
file name : Image_20072021132123192.png
|
2021-07-20 13:21:23.276649 |
22 |
34951040 |
Cleaining of Kuchcha Drain and sludge in existing drain at Sansad V |
142870 |
Cleaining of Kuchcha Drain and sludge in existing drain at Sansad V1 |
Completion of work |
-
latitude : 22.91458,22.9145513
Longitude : 88.3813012,88.3812957
file name : Image_14072021111302628.png
|
2021-07-14 11:13:02.713251 |
23 |
39076407 |
CCover Drain from Srikanta Khan to Cittaranjan Gyne |
345223 |
CCover Drain from Srikanta Khan to Cittaranjan Gyne1 |
Roof laid |
-
latitude : 22.9013656,22.9013656,22.9013656
Longitude : 88.377484,88.377484,88.377484
file name : Image_06072021135739917.png
|
2021-07-06 13:57:40.022652 |
24 |
39076407 |
CCover Drain from Srikanta Khan to Cittaranjan Gyne |
345223 |
CCover Drain from Srikanta Khan to Cittaranjan Gyne1 |
Roof laid |
-
latitude : 22.9013771,22.9013444
Longitude : 88.3774803,88.3775331
file name : Image_06072021135953121.png
|
2021-07-06 13:59:53.265033 |
25 |
39076407 |
CCover Drain from Srikanta Khan to Cittaranjan Gyne |
345223 |
CCover Drain from Srikanta Khan to Cittaranjan Gyne1 |
Roof laid |
-
latitude : 22.901386666666667,22.901337
Longitude : 88.37810333333333,88.377553
file name : Image_06072021140509197.png
|
2021-07-06 14:05:09.327003 |
26 |
39076407 |
CCover Drain from Srikanta Khan to Cittaranjan Gyne |
345223 |
CCover Drain from Srikanta Khan to Cittaranjan Gyne1 |
Roof laid |
-
latitude : 22.9012898,22.9013493,22.9013757
Longitude : 88.377589,88.377538,88.37748
file name : Image_06072021141119636.png
|
2021-07-06 14:11:19.776672 |
27 |
39076407 |
CCover Drain from Srikanta Khan to Cittaranjan Gyne |
345223 |
CCover Drain from Srikanta Khan to Cittaranjan Gyne1 |
Plinth level |
-
latitude : 22.8992532,22.9013749
Longitude : 88.3765652,88.3774776
file name : Image_02072021152057023.png
|
2021-07-02 15:20:57.142184 |
28 |
39076407 |
CCover Drain from Srikanta Khan to Cittaranjan Gyne |
345223 |
CCover Drain from Srikanta Khan to Cittaranjan Gyne1 |
Completion of work |
-
latitude : 22.9013794,22.90139166666667
Longitude : 88.3774758,88.37809999999999
file name : Image_02072021150442411.png
|
2021-07-02 15:04:42.560971 |
29 |
34905921 |
CC Road Sukdeb Goswami to Kanai Pal |
202217 |
CC Road Sukdeb Goswami to Kanai Pal1 |
Completion of work |
-
latitude : 22.9000083,22.8997149
Longitude : 88.3768532,88.3767738
file name : Image_22012022150412280.png
|
2022-01-22 15:04:12.37708 |
30 |
34905921 |
CC Road Sukdeb Goswami to Kanai Pal |
202217 |
CC Road Sukdeb Goswami to Kanai Pal1 |
Completion of work |
-
latitude : 22.900789999999997,22.9008049
Longitude : 88.376765,88.3771945
file name : Image_22012022150604364.png
|
2022-01-22 15:06:04.45717 |
31 |
34905921 |
CC Road Sukdeb Goswami to Kanai Pal |
202217 |
CC Road Sukdeb Goswami to Kanai Pal1 |
Completion of work |
-
latitude : 22.9085147,22.908551666666668
Longitude : 88.3702551,88.37079166666666
file name : Image_22012022122311487.png
|
2022-01-22 12:23:11.584809 |
32 |
34905921 |
CC Road Sukdeb Goswami to Kanai Pal |
202217 |
CC Road Sukdeb Goswami to Kanai Pal1 |
Completion of work |
-
latitude : 22.9009953,22.9010119
Longitude : 88.376989,88.3769977
file name : Image_14012022122330342.png
|
2022-01-14 12:23:30.435987 |
33 |
34905921 |
CC Road Sukdeb Goswami to Kanai Pal |
202217 |
CC Road Sukdeb Goswami to Kanai Pal1 |
Completion of work |
-
latitude : 22.9009953,22.9010119
Longitude : 88.376989,88.3769977
file name : Image_14012022122337484.png
|
2022-01-14 12:23:37.56024 |
34 |
34905921 |
CC Road Sukdeb Goswami to Kanai Pal |
202217 |
CC Road Sukdeb Goswami to Kanai Pal1 |
Completion of work |
-
latitude : 22.9087655,22.9088259
Longitude : 88.3819511,88.3819574
file name : Image_14012022133511820.png
|
2022-01-14 13:35:11.923181 |
35 |
39069577 |
CCover Drain from Ratan Aich to Asoke Biswas |
237232 |
CCover Drain from Ratan Aich to Asoke Biswas1 |
Roof laid |
-
latitude : 22.899605,22.899605
Longitude : 88.3767839,88.3767839
file name : Image_14012022122232582.png
|
2022-01-14 12:22:32.680677 |
36 |
39069577 |
CCover Drain from Ratan Aich to Asoke Biswas |
237232 |
CCover Drain from Ratan Aich to Asoke Biswas1 |
Completion of work |
-
latitude : 22.8998133,22.9001791
Longitude : 88.3793135,88.3791827
file name : Image_21072021112406101.png
|
2021-07-21 11:24:06.181959 |
37 |
39069577 |
CCover Drain from Ratan Aich to Asoke Biswas |
237232 |
CCover Drain from Ratan Aich to Asoke Biswas1 |
Completion of work |
-
latitude : 22.8996465,22.9006337
Longitude : 88.3768568,88.3765551
file name : Image_21072021112415993.png
|
2021-07-21 11:24:16.071229 |
38 |
39069577 |
CCover Drain from Ratan Aich to Asoke Biswas |
237232 |
CCover Drain from Ratan Aich to Asoke Biswas1 |
Completion of work |
-
latitude : 22.9002339,22.8998003
Longitude : 88.3791485,88.3793139
file name : Image_21072021112351543.png
|
2021-07-21 11:23:51.624249 |
39 |
39069577 |
CCover Drain from Ratan Aich to Asoke Biswas |
237232 |
CCover Drain from Ratan Aich to Asoke Biswas1 |
Completion of work |
-
latitude : 22.9105238,22.9105089
Longitude : 88.3805365,88.3805629
file name : Image_20072021132114513.png
|
2021-07-20 13:21:14.613086 |
40 |
39069577 |
CCover Drain from Ratan Aich to Asoke Biswas |
237232 |
CCover Drain from Ratan Aich to Asoke Biswas1 |
Completion of work |
-
latitude : 22.906913333333332,22.906814999999998
Longitude : 88.36934500000001,88.369375
file name : Image_20072021132119280.png
|
2021-07-20 13:21:19.373584 |
41 |
39069577 |
CCover Drain from Ratan Aich to Asoke Biswas |
237232 |
CCover Drain from Ratan Aich to Asoke Biswas1 |
Completion of work |
-
latitude : 22.8998039,22.8998041
Longitude : 88.379296,88.3793113
file name : Image_14072021112558088.png
|
2021-07-14 11:25:58.18887 |
42 |
34962845 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area |
677194 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area1 |
Completion of work |
-
latitude : 22.9088292
Longitude : 88.3819613
file name : Image_29072021154524182.png
|
2021-07-29 15:45:24.293956 |
43 |
34962845 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area |
677194 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area1 |
Completion of work |
-
latitude : 22.909379
Longitude : 88.3821454
file name : Image_29072021153634773.png
|
2021-07-29 15:36:34.904308 |
44 |
34962845 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area |
677194 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area1 |
Completion of work |
-
latitude : 22.90895
Longitude : 88.3819219
file name : Image_29072021153721538.png
|
2021-07-29 15:37:21.645771 |
45 |
34962845 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area |
677194 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area1 |
Completion of work |
-
latitude : 22.9089871
Longitude : 88.3819198
file name : Image_29072021153716240.png
|
2021-07-29 15:37:16.367797 |
46 |
34962845 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area |
677194 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area1 |
Completion of work |
-
latitude : 22.90895
Longitude : 88.3819219
file name : Image_29072021153846580.png
|
2021-07-29 15:38:46.687523 |
47 |
34962845 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area |
677194 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area1 |
Completion of work |
-
latitude : 22.901423
Longitude : 88.3769842
file name : Image_27072021150938976.png
|
2021-07-27 15:09:39.102339 |
48 |
34962845 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area |
677194 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area1 |
Completion of work |
-
latitude : 22.9051276
Longitude : 88.376531
file name : Image_27072021150932557.png
|
2021-07-27 15:09:32.651793 |
49 |
34962845 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area |
677194 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area1 |
Completion of work |
-
latitude : 22.90465
Longitude : 88.37644333333334
file name : Image_27072021150929723.png
|
2021-07-27 15:09:29.822658 |
50 |
34962845 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area |
677194 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area1 |
Completion of work |
-
latitude : 22.9050973
Longitude : 88.3763153
file name : Image_27072021150925117.png
|
2021-07-27 15:09:25.25294 |
51 |
34962845 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area |
677194 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area1 |
Completion of work |
-
latitude : 22.9050718
Longitude : 88.376367
file name : Image_27072021150920471.png
|
2021-07-27 15:09:20.62265 |
52 |
34962845 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area |
677194 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area99 |
Roof laid |
-
latitude : 22.9014317
Longitude : 88.3768997
file name : Image_01082021110119029.png
|
2021-08-01 11:01:19.109692 |
53 |
34962845 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area |
677194 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area99 |
Completion of work |
-
latitude : 22.9090178
Longitude : 88.3821476
file name : Image_29072021153644602.png
|
2021-07-29 15:36:44.723749 |
54 |
34962845 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area |
677194 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area99 |
Completion of work |
-
latitude : 22.9090178
Longitude : 88.3821476
file name : Image_29072021153738841.png
|
2021-07-29 15:37:38.951118 |
55 |
34962845 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area |
677194 |
Installation of Electrical poll tapping street light with Led at Different Sansad under Gp area99 |
Completion of work |
-
latitude : 22.9011789
Longitude : 88.3769034
file name : Image_27072021150944831.png
|
2021-07-27 15:09:44.934538 |
56 |
34963220 |
Maintenance of Electrical poll tapping street light with Led at Different Sansad under Gp area |
2394165 |
Maintenance of Electrical poll tapping street light with Led at Different Sansad under Gp area99 |
Completion of work |
-
latitude : 22.9012872
Longitude : 88.3768516
file name : Image_24072021181913566.png
|
2021-07-24 18:19:13.681874 |
57 |
34963220 |
Maintenance of Electrical poll tapping street light with Led at Different Sansad under Gp area |
2394165 |
Maintenance of Electrical poll tapping street light with Led at Different Sansad under Gp area99 |
Completion of work |
-
latitude : 22.9014344
Longitude : 88.3768947
file name : Image_23072021115434981.png
|
2021-07-23 11:54:35.089143 |
58 |
34832056 |
CC Road from Haradhan Ruidas to Mahadev Ruidas via Rajkumar Ruidas via sushanta das |
347321 |
CC Road from Haradhan Ruidas to Mahadev Ruidas via Rajkumar Ruidas via sushanta das1 |
Plinth level |
-
latitude : 22.90829666666667,22.911886666666668
Longitude : 88.38188333333333,88.36254499999998
file name : Image_16092021094102511.png
|
2021-09-16 09:41:02.620974 |
59 |
34832056 |
CC Road from Haradhan Ruidas to Mahadev Ruidas via Rajkumar Ruidas via sushanta das |
347321 |
CC Road from Haradhan Ruidas to Mahadev Ruidas via Rajkumar Ruidas via sushanta das1 |
Plinth level |
-
latitude : 22.9123289,22.9123294
Longitude : 88.3627064,88.3627127
file name : Image_16092021094205939.png
|
2021-09-16 09:42:06.031918 |
60 |
34832056 |
CC Road from Haradhan Ruidas to Mahadev Ruidas via Rajkumar Ruidas via sushanta das |
347321 |
CC Road from Haradhan Ruidas to Mahadev Ruidas via Rajkumar Ruidas via sushanta das1 |
Completion of work |
-
latitude : 22.9088634,22.9088807,22.9089432,22.9090469
Longitude : 88.3819603,88.3819558,88.3818818,88.3818507
file name : Image_04082021173438761.png
|
2021-08-04 17:34:38.908287 |
61 |
34832056 |
CC Road from Haradhan Ruidas to Mahadev Ruidas via Rajkumar Ruidas via sushanta das |
347321 |
CC Road from Haradhan Ruidas to Mahadev Ruidas via Rajkumar Ruidas via sushanta das1 |
Completion of work |
-
latitude : 22.908468333333335,22.908453333333334
Longitude : 88.37086166666668,88.37083666666668
file name : Image_05082021195225998.png
|
2021-08-05 19:52:26.090764 |
62 |
34832056 |
CC Road from Haradhan Ruidas to Mahadev Ruidas via Rajkumar Ruidas via sushanta das |
347321 |
CC Road from Haradhan Ruidas to Mahadev Ruidas via Rajkumar Ruidas via sushanta das1 |
Completion of work |
-
latitude : 22.9014311,22.9014295,22.9014311,22.9014311
Longitude : 88.3769,88.376892,88.3768908,88.3768908
file name : Image_04082021135044039.png
|
2021-08-04 13:50:44.167699 |
63 |
34904123 |
CC Road from Matri Chhaya to Mritunjay Dey |
347889 |
CC Road from Matri Chhaya to Mritunjay Dey 1 |
Completion of work |
-
latitude : 22.9045043,22.9044939
Longitude : 88.3766355,88.376641
file name : Image_22122021113036485.png
|
2021-12-22 11:30:36.597099 |
64 |
34904123 |
CC Road from Matri Chhaya to Mritunjay Dey |
347889 |
CC Road from Matri Chhaya to Mritunjay Dey 1 |
Completion of work |
-
latitude : 22.9045284,22.9044904
Longitude : 88.3766551,88.3766537
file name : Image_22122021102719773.png
|
2021-12-22 10:27:19.867433 |
65 |
34865535 |
CC Road from Nityananda Sil to Bijay Barman |
295359 |
CC Road from Nityananda Sil to Bijay Barman 1 |
Roof laid |
-
latitude : 22.908538333333333,22.90852333333333,22.908530000000003
Longitude : 88.370435,88.37042500000001,88.37042333333332
file name : Image_16092021094058762.png
|
2021-09-16 09:40:58.871811 |
66 |
34865535 |
CC Road from Nityananda Sil to Bijay Barman |
295359 |
CC Road from Nityananda Sil to Bijay Barman 1 |
Completion of work |
-
latitude : 22.904733333333336,22.904686666666667
Longitude : 88.37655166666667,88.37659666666666
file name : Image_04082021173442857.png
|
2021-08-04 17:34:43.009657 |
67 |
34865535 |
CC Road from Nityananda Sil to Bijay Barman |
295359 |
CC Road from Nityananda Sil to Bijay Barman 1 |
Completion of work |
-
latitude : 22.9045271,22.9051348
Longitude : 88.3765515,88.3764004
file name : Image_04082021173547468.png
|
2021-08-04 17:35:47.583089 |
68 |
34865535 |
CC Road from Nityananda Sil to Bijay Barman |
295359 |
CC Road from Nityananda Sil to Bijay Barman 1 |
Completion of work |
-
latitude : 22.9089806,22.9088696
Longitude : 88.3819275,88.3819573
file name : Image_04082021135052888.png
|
2021-08-04 13:50:53.012755 |
69 |
34865535 |
CC Road from Nityananda Sil to Bijay Barman |
295359 |
CC Road from Nityananda Sil to Bijay Barman 1 |
Completion of work |
-
latitude : 22.9014311,22.9014293
Longitude : 88.3769,88.3769015
file name : Image_04082021091252421.png
|
2021-08-04 09:12:52.554808 |
70 |
34909874 |
CC Road Swapan Kundu to Krishna Kundu Sansad No I |
25075 |
CC Road Swapan Kundu to Krishna Kundu Sansad No I1 |
Roof laid |
-
latitude : 22.901056666666666,22.9008203
Longitude : 88.37848666666666,88.378711
file name : Image_21122021084603577.png
|
2021-12-21 08:46:03.686408 |
71 |
34909874 |
CC Road Swapan Kundu to Krishna Kundu Sansad No I |
25075 |
CC Road Swapan Kundu to Krishna Kundu Sansad No I1 |
Roof laid |
-
latitude : 22.9010384,22.9010373
Longitude : 88.3785981,88.3785934
file name : Image_21122021085032425.png
|
2021-12-21 08:50:32.525599 |
72 |
34909874 |
CC Road Swapan Kundu to Krishna Kundu Sansad No I |
25075 |
CC Road Swapan Kundu to Krishna Kundu Sansad No I1 |
Completion of work |
-
latitude : 22.9044511,22.9044293,22.9044315
Longitude : 88.3766529,88.3766704,88.376667
file name : Image_25112021103807879.png
|
2021-11-25 10:38:07.981035 |
73 |
34909874 |
CC Road Swapan Kundu to Krishna Kundu Sansad No I |
25075 |
CC Road Swapan Kundu to Krishna Kundu Sansad No I1 |
Completion of work |
-
latitude : 22.904719999999998,22.9047959
Longitude : 88.37640833333334,88.3766752
file name : Image_22112021112328808.png
|
2021-11-22 11:23:28.941537 |
74 |
34910648 |
CC Road Nibir Halder to Dulal Ray Sansad No I |
23022 |
CC Road Nibir Halder to Dulal Ray Sansad No I1 |
Roof laid |
-
latitude : 22.9011925,22.9011925
Longitude : 88.378711,88.378711
file name : Image_21122021084600040.png
|
2021-12-21 08:46:00.155231 |
75 |
34910648 |
CC Road Nibir Halder to Dulal Ray Sansad No I |
23022 |
CC Road Nibir Halder to Dulal Ray Sansad No I1 |
Roof laid |
-
latitude : 22.9010375,22.9010383
Longitude : 88.3785922,88.3785987
file name : Image_21122021085231086.png
|
2021-12-21 08:52:31.199875 |
76 |
34910648 |
CC Road Nibir Halder to Dulal Ray Sansad No I |
23022 |
CC Road Nibir Halder to Dulal Ray Sansad No I1 |
Completion of work |
-
latitude : 22.9044475,22.9044228
Longitude : 88.3766561,88.3767
file name : Image_25112021103934115.png
|
2021-11-25 10:39:34.247873 |
77 |
34910648 |
CC Road Nibir Halder to Dulal Ray Sansad No I |
23022 |
CC Road Nibir Halder to Dulal Ray Sansad No I1 |
Completion of work |
-
latitude : 22.8963352,22.90472833333333,22.904758333333334
Longitude : 88.3810689,88.37621833333333,88.37620999999999
file name : Image_22112021112620564.png
|
2021-11-22 11:26:20.685043 |
78 |
34910648 |
CC Road Nibir Halder to Dulal Ray Sansad No I |
23022 |
CC Road Nibir Halder to Dulal Ray Sansad No I1 |
Completion of work |
-
latitude : 22.90472333333333,22.904700000000002
Longitude : 88.37618333333333,88.37620166666666
file name : Image_22112021112705667.png
|
2021-11-22 11:27:05.7892 |
79 |
34908314 |
CC Road Sudhir Saha to Santosh Sachki Sansad No I |
122864 |
CC Road Sudhir Saha to Santosh Sachki Sansad No I1 |
Roof laid |
-
latitude : 22.9008233,22.901075
Longitude : 88.3790143,88.37843166666669
file name : Image_21122021084556306.png
|
2021-12-21 08:45:56.425715 |
80 |
34908314 |
CC Road Sudhir Saha to Santosh Sachki Sansad No I |
122864 |
CC Road Sudhir Saha to Santosh Sachki Sansad No I1 |
Roof laid |
-
latitude : 22.9008233,22.901075
Longitude : 88.3790143,88.37843166666669
file name : Image_21122021084607038.png
|
2021-12-21 08:46:07.152092 |
81 |
34908314 |
CC Road Sudhir Saha to Santosh Sachki Sansad No I |
122864 |
CC Road Sudhir Saha to Santosh Sachki Sansad No I1 |
Roof laid |
-
latitude : 22.9010375,22.9010373
Longitude : 88.3785922,88.3785934
file name : Image_21122021084910116.png
|
2021-12-21 08:49:10.223211 |
82 |
34908314 |
CC Road Sudhir Saha to Santosh Sachki Sansad No I |
122864 |
CC Road Sudhir Saha to Santosh Sachki Sansad No I1 |
Completion of work |
-
latitude : 22.9044615,22.904471,22.9044326
Longitude : 88.3766311,88.3766518,88.3766604
file name : Image_25112021103658419.png
|
2021-11-25 10:36:58.535843 |
83 |
34908314 |
CC Road Sudhir Saha to Santosh Sachki Sansad No I |
122864 |
CC Road Sudhir Saha to Santosh Sachki Sansad No I1 |
Completion of work |
-
latitude : 22.904721666666667,22.9044888
Longitude : 88.37648166666668,88.3766089
file name : Image_22112021112202909.png
|
2021-11-22 11:22:03.028906 |
84 |
34904979 |
CC Road Subhas Ray to Ajit Guha Ray |
100387 |
CC Road Subhas Ray to Ajit Guha Ray1 |
Completion of work |
-
latitude : 22.9127537,22.9127586
Longitude : 88.3786547,88.3786574
file name : Image_08102021133544938.png
|
2021-10-08 13:35:45.032829 |
85 |
34904979 |
CC Road Subhas Ray to Ajit Guha Ray |
100387 |
CC Road Subhas Ray to Ajit Guha Ray1 |
Completion of work |
-
latitude : 22.9131861,22.9131878
Longitude : 88.3784606,88.3784595
file name : Image_08102021133552618.png
|
2021-10-08 13:35:52.718094 |
86 |
34904979 |
CC Road Subhas Ray to Ajit Guha Ray |
100387 |
CC Road Subhas Ray to Ajit Guha Ray1 |
Completion of work |
-
latitude : 22.9131858,22.9131814
Longitude : 88.3784731,88.3784598
file name : Image_08102021133649150.png
|
2021-10-08 13:36:49.237031 |
87 |
34904979 |
CC Road Subhas Ray to Ajit Guha Ray |
100387 |
CC Road Subhas Ray to Ajit Guha Ray1 |
Completion of work |
-
latitude : 22.9088243,22.9088714
Longitude : 88.3819154,88.3819086
file name : Image_29092021125038788.png
|
2021-09-29 12:50:38.896379 |
88 |
34904979 |
CC Road Subhas Ray to Ajit Guha Ray |
100387 |
CC Road Subhas Ray to Ajit Guha Ray1 |
Completion of work |
-
latitude : 22.9088985,22.9091986
Longitude : 88.3819698,88.381688
file name : Image_29092021125152829.png
|
2021-09-29 12:51:52.957022 |
89 |
34904979 |
CC Road Subhas Ray to Ajit Guha Ray |
100387 |
CC Road Subhas Ray to Ajit Guha Ray1 |
Completion of work |
-
latitude : 22.9076775,22.9076763
Longitude : 88.3698751,88.3698746
file name : Image_28092021111727909.png
|
2021-09-28 11:17:28.004458 |
90 |
34902399 |
CC Road from Farm side to Hooghly satation |
176230 |
CC Road from Farm side to Hooghly satation 1 |
Completion of work |
-
latitude : 22.9127052,22.9127773
Longitude : 88.3783701,88.3782924
file name : Image_08102021133123658.png
|
2021-10-08 13:31:23.784593 |
91 |
34902399 |
CC Road from Farm side to Hooghly satation |
176230 |
CC Road from Farm side to Hooghly satation 1 |
Completion of work |
-
latitude : 22.9128002,22.9127744
Longitude : 88.3782951,88.3784188
file name : Image_08102021133258090.png
|
2021-10-08 13:32:58.20408 |
92 |
34902399 |
CC Road from Farm side to Hooghly satation |
176230 |
CC Road from Farm side to Hooghly satation 1 |
Completion of work |
-
latitude : 22.9089904,22.9088453
Longitude : 88.3819197,88.3819983
file name : Image_29092021123517613.png
|
2021-09-29 12:35:17.68872 |
93 |
34902399 |
CC Road from Farm side to Hooghly satation |
176230 |
CC Road from Farm side to Hooghly satation 1 |
Completion of work |
-
latitude : 22.9076732,22.9076872
Longitude : 88.3698704,88.3698813
file name : Image_28092021111601626.png
|
2021-09-28 11:16:01.727136 |
94 |
34949922 |
Cleaining of Kuchcha Drain and sludge in existing drain at Sansad III |
349111 |
Cleaining of Kuchcha Drain and sludge in existing drain at Sansad III1 |
Completion of work |
-
latitude : 22.9008141,22.9004511
Longitude : 88.3781044,88.3790143
file name : Image_03032022115434580.png
|
2022-03-03 11:54:34.695716 |
95 |
34949922 |
Cleaining of Kuchcha Drain and sludge in existing drain at Sansad III |
349111 |
Cleaining of Kuchcha Drain and sludge in existing drain at Sansad III1 |
Completion of work |
-
latitude : 22.9004511,22.9004511
Longitude : 88.3790143,88.3790143
file name : Image_03032022115439364.png
|
2022-03-03 11:54:39.468258 |
96 |
34949922 |
Cleaining of Kuchcha Drain and sludge in existing drain at Sansad III |
349111 |
Cleaining of Kuchcha Drain and sludge in existing drain at Sansad III1 |
Completion of work |
-
latitude : 22.8951797,22.8952043
Longitude : 88.3855989,88.3856209
file name : Image_27022022142415608.png
|
2022-02-27 14:24:15.692323 |
97 |
34949922 |
Cleaining of Kuchcha Drain and sludge in existing drain at Sansad III |
349111 |
Cleaining of Kuchcha Drain and sludge in existing drain at Sansad III1 |
Completion of work |
-
latitude : 22.8951739,22.8951684
Longitude : 88.3855923,88.3855833
file name : Image_27022022103906677.png
|
2022-02-27 10:39:06.796542 |
98 |
34860156 |
CC Road from Biswanath Das to Ashis Pal |
233592 |
CC Road from Biswanath Das to Ashis Pal 1 |
Completion of work |
-
latitude : 22.9012863,22.9013852
Longitude : 88.3774593,88.3774632
file name : Image_03032022111712569.png
|
2022-03-03 11:17:12.688216 |
99 |
34860156 |
CC Road from Biswanath Das to Ashis Pal |
233592 |
CC Road from Biswanath Das to Ashis Pal 1 |
Completion of work |
-
latitude : 22.9013586,22.9005486
Longitude : 88.3775008,88.377052
file name : Image_03032022115110181.png
|
2022-03-03 11:51:10.304792 |
100 |
34860156 |
CC Road from Biswanath Das to Ashis Pal |
233592 |
CC Road from Biswanath Das to Ashis Pal 1 |
Completion of work |
-
latitude : 22.8951851,22.8951851
Longitude : 88.3855851,88.3855851
file name : Image_27022022142316281.png
|
2022-02-27 14:23:16.362729 |
101 |
34860156 |
CC Road from Biswanath Das to Ashis Pal |
233592 |
CC Road from Biswanath Das to Ashis Pal 1 |
Completion of work |
-
latitude : 22.8952727,22.8952653
Longitude : 88.3856492,88.3856327
file name : Image_27022022095437244.png
|
2022-02-27 09:54:37.371361 |
102 |
34936939 |
Construction of Concrite Drain from Mantu Dutta to Sekhar Das |
349210 |
Construction of Concrite Drain from Mantu Dutta to Sekhar Das 1 |
Plinth level |
-
latitude : 22.901453333333333,22.901455000000002
Longitude : 88.37748666666667,88.37749833333334
file name : Image_22122021124419525.png
|
2021-12-22 12:44:19.645088 |
103 |
34936939 |
Construction of Concrite Drain from Mantu Dutta to Sekhar Das |
349210 |
Construction of Concrite Drain from Mantu Dutta to Sekhar Das 1 |
Plinth level |
-
latitude : 22.901384999999998,22.90140166666667
Longitude : 88.37751333333333,88.377535
file name : Image_22122021122531843.png
|
2021-12-22 12:25:32.048796 |
104 |
34915106 |
CC Road Jatileshswar Mandir to Jay Narayan Ghosh |
342053 |
CC Road Jatileshswar Mandir to Jay Narayan Ghosh1 |
Completion of work |
-
latitude : 22.901419999999998,22.901423333333334
Longitude : 88.37749000000001,88.37748166666667
file name : Image_22122021123641484.png
|
2021-12-22 12:36:41.605473 |
105 |
34915106 |
CC Road Jatileshswar Mandir to Jay Narayan Ghosh |
342053 |
CC Road Jatileshswar Mandir to Jay Narayan Ghosh1 |
Completion of work |
-
latitude : 22.9044857,22.9044952
Longitude : 88.376653,88.3766446
file name : Image_22122021113127846.png
|
2021-12-22 11:31:27.977263 |
106 |
34915106 |
CC Road Jatileshswar Mandir to Jay Narayan Ghosh |
342053 |
CC Road Jatileshswar Mandir to Jay Narayan Ghosh1 |
Completion of work |
-
latitude : 22.8994996,22.90140166666667
Longitude : 88.3767178,88.37751166666666
file name : Image_22122021122934814.png
|
2021-12-22 12:29:34.924189 |
107 |
34915106 |
CC Road Jatileshswar Mandir to Jay Narayan Ghosh |
342053 |
CC Road Jatileshswar Mandir to Jay Narayan Ghosh1 |
Completion of work |
-
latitude : 22.9044925,22.9044931,22.9044813
Longitude : 88.3766487,88.3766522,88.3766544
file name : Image_22122021102856972.png
|
2021-12-22 10:28:57.071697 |
108 |
34931723 |
CC Road to Sanjay Karmakar to Tori Karmakar |
49175 |
CC Road to Sanjay Karmakar to Tori Karmakar1 |
Completion of work |
-
latitude : 22.9050455,22.9050455
Longitude : 88.3766485,88.3766485
file name : Image_28012022124254327.png
|
2022-01-28 12:42:54.43622 |
109 |
34931723 |
CC Road to Sanjay Karmakar to Tori Karmakar |
49175 |
CC Road to Sanjay Karmakar to Tori Karmakar1 |
Completion of work |
-
latitude : 22.9044372,22.9049509
Longitude : 88.3766421,88.3766836
file name : Image_28012022124157952.png
|
2022-01-28 12:41:58.086527 |
110 |
34931723 |
CC Road to Sanjay Karmakar to Tori Karmakar |
49175 |
CC Road to Sanjay Karmakar to Tori Karmakar1 |
Completion of work |
-
latitude : 22.904659,22.9046709
Longitude : 88.3765294,88.3765249
file name : Image_28012022122458438.png
|
2022-01-28 12:24:58.538674 |
111 |
34931723 |
CC Road to Sanjay Karmakar to Tori Karmakar |
49175 |
CC Road to Sanjay Karmakar to Tori Karmakar1 |
Completion of work |
-
latitude : 22.905249,22.905249
Longitude : 88.376426,88.376426
file name : Image_28012022123719783.png
|
2022-01-28 12:37:19.898047 |
112 |
34931723 |
CC Road to Sanjay Karmakar to Tori Karmakar |
49175 |
CC Road to Sanjay Karmakar to Tori Karmakar1 |
Completion of work |
-
latitude : 22.9049591,22.904438
Longitude : 88.3765804,88.376641
file name : Image_28012022122613690.png
|
2022-01-28 12:26:14.356881 |
113 |
34931723 |
CC Road to Sanjay Karmakar to Tori Karmakar |
49175 |
CC Road to Sanjay Karmakar to Tori Karmakar1 |
Completion of work |
-
latitude : 22.9088367,22.9088367
Longitude : 88.381971,88.381971
file name : Image_28012022122230949.png
|
2022-01-28 12:22:31.096762 |
114 |
34931723 |
CC Road to Sanjay Karmakar to Tori Karmakar |
49175 |
CC Road to Sanjay Karmakar to Tori Karmakar1 |
Completion of work |
-
latitude : 22.9088367,22.9049315
Longitude : 88.381971,88.3766382
file name : Image_28012022122241574.png
|
2022-01-28 12:22:41.694516 |
115 |
72314104 |
Maintenance of Street Lights |
199186 |
Maintenance of Street Lights1 |
|
-
latitude : 22.9001871
Longitude : 88.3823322
file name : Image_29022024180031245.png
|
2024-02-29 18:00:31.351846 |
116 |
49235566 |
CC Drain Nemai Chand Biswas to Jhill |
448335 |
CC Drain Nemai Chand Biswas to Jhill1 |
Plinth level |
-
latitude : 22.9027914,22.901728333333335
Longitude : 88.3773428,88.376815
file name : Image_13102022122839768.png
|
2022-10-13 12:28:39.894929 |
117 |
49235566 |
CC Drain Nemai Chand Biswas to Jhill |
448335 |
CC Drain Nemai Chand Biswas to Jhill1 |
Completion of work |
-
latitude : 22.901163333333336,22.901191666666666
Longitude : 88.37552666666667,88.37558333333332
file name : Image_27082022054028494.png
|
2022-08-27 05:40:28.597789 |
118 |
49235566 |
CC Drain Nemai Chand Biswas to Jhill |
448335 |
CC Drain Nemai Chand Biswas to Jhill1 |
Completion of work |
-
latitude : 22.901201666666665,22.901206666666667
Longitude : 88.37576666666668,88.37578666666668
file name : Image_31082022113040308.png
|
2022-08-31 11:30:40.40926 |
119 |
49207505 |
CC Road from Raju Caset Shop to Premanshu Ghosh |
125645 |
CC Road from Raju Caset Shop to Premanshu Ghosh1 |
Plinth level |
-
latitude : 22.9046689,22.9047522
Longitude : 88.3799445,88.3798864
file name : Image_24082022153938177.png
|
2022-08-24 15:39:38.279321 |
120 |
49207505 |
CC Road from Raju Caset Shop to Premanshu Ghosh |
125645 |
CC Road from Raju Caset Shop to Premanshu Ghosh1 |
Plinth level |
-
latitude : 22.9043902,22.9043906
Longitude : 88.3798284,88.3797979
file name : Image_19082022133229464.png
|
2022-08-19 13:32:29.569325 |
121 |
49207505 |
CC Road from Raju Caset Shop to Premanshu Ghosh |
125645 |
CC Road from Raju Caset Shop to Premanshu Ghosh1 |
Completion of work |
-
latitude : 22.9047934,22.900516666666665
Longitude : 88.3798808,88.37705666666668
file name : Image_29072022113733739.png
|
2022-07-29 11:37:33.83951 |
122 |
49208825 |
CC Road from Tanumay Bose to Ratneshwar Dalal via Jayanta Bhattacharya |
263409 |
CC Road from Tanumay Bose to Ratneshwar Dalal via Jayanta Bhattacharya1 |
Plinth level |
-
latitude : 22.9080168,22.9079982
Longitude : 88.3817872,88.3818407
file name : Image_19082022123734081.png
|
2022-08-19 12:37:34.195204 |
123 |
49208825 |
CC Road from Tanumay Bose to Ratneshwar Dalal via Jayanta Bhattacharya |
263409 |
CC Road from Tanumay Bose to Ratneshwar Dalal via Jayanta Bhattacharya1 |
Completion of work |
-
latitude : 22.9037943,22.9038316
Longitude : 88.3819808,88.3819461
file name : Image_26072022175254395.png
|
2022-07-26 17:52:54.503707 |
124 |
49223306 |
CC Road Harekrishna Debnath to Balaram Ghosh |
57447 |
CC Road Harekrishna Debnath to Balaram Ghosh1 |
Completion of work |
-
latitude : 22.9037591,22.9038061
Longitude : 88.3819773,88.3819798
file name : Image_24082022153436804.png
|
2022-08-24 15:34:36.89585 |
125 |
49223306 |
CC Road Harekrishna Debnath to Balaram Ghosh |
57447 |
CC Road Harekrishna Debnath to Balaram Ghosh1 |
Completion of work |
-
latitude : 22.9038238,22.9038312
Longitude : 88.3819909,88.3819863
file name : Image_24082022153249239.png
|
2022-08-24 15:32:49.335271 |
126 |
49223306 |
CC Road Harekrishna Debnath to Balaram Ghosh |
57447 |
CC Road Harekrishna Debnath to Balaram Ghosh1 |
Completion of work |
-
latitude : 22.903847,22.903847
Longitude : 88.3819569,88.3819569
file name : Image_19082022132951703.png
|
2022-08-19 13:29:51.813054 |
127 |
49223306 |
CC Road Harekrishna Debnath to Balaram Ghosh |
57447 |
CC Road Harekrishna Debnath to Balaram Ghosh1 |
Completion of work |
-
latitude : 22.9013581,22.901508
Longitude : 88.3774857,88.3771278
file name : Image_05082022141857339.png
|
2022-08-05 14:18:57.438556 |
128 |
49223306 |
CC Road Harekrishna Debnath to Balaram Ghosh |
57447 |
CC Road Harekrishna Debnath to Balaram Ghosh1 |
Completion of work |
-
latitude : 22.901506666666666,22.901516666666666
Longitude : 88.37695666666666,88.37692666666665
file name : Image_05082022122130649.png
|
2022-08-05 12:21:30.74412 |
129 |
63800992 |
Construction of drain from Durgamandir to Koushik Majumder |
238199 |
Construction of drain from Durgamandir to Koushik Majumder1 |
Completion of work |
-
latitude : 22.8997816,22.8999428
Longitude : 88.3767419,88.3766522
file name : Image_23092022160646413.png
|
2022-09-23 16:06:46.507465 |
130 |
63800992 |
Construction of drain from Durgamandir to Koushik Majumder |
238199 |
Construction of drain from Durgamandir to Koushik Majumder1 |
Completion of work |
-
latitude : 22.8998393,22.9003668
Longitude : 88.3769179,88.3765094
file name : Image_31082022155747521.png
|
2022-08-31 15:57:47.637616 |
131 |
34939993 |
Construction of Concrite Drain Dulal Samaddar to Nabarun sarkar kalvert via beside Rabindra Sangha |
499254 |
Construction of Concrite Drain Dulal Samaddar to Nabarun sarkar kalvert via beside Rabindra Sangha1 |
Completion of work |
-
latitude : 22.8973438,22.8973438
Longitude : 88.3787808,88.3787808
file name : Image_15112022083820487.png
|
2022-11-15 08:38:20.587206 |
132 |
34939993 |
Construction of Concrite Drain Dulal Samaddar to Nabarun sarkar kalvert via beside Rabindra Sangha |
499254 |
Construction of Concrite Drain Dulal Samaddar to Nabarun sarkar kalvert via beside Rabindra Sangha1 |
Completion of work |
-
latitude : 22.8973452,22.897332
Longitude : 88.3787588,88.3787538
file name : Image_15112022083921716.png
|
2022-11-15 08:39:21.80732 |
133 |
34939993 |
Construction of Concrite Drain Dulal Samaddar to Nabarun sarkar kalvert via beside Rabindra Sangha |
499254 |
Construction of Concrite Drain Dulal Samaddar to Nabarun sarkar kalvert via beside Rabindra Sangha1 |
Completion of work |
-
latitude : 22.8973857,22.8973749
Longitude : 88.3789999,88.3789935
file name : Image_05112022115315362.png
|
2022-11-05 11:53:15.483101 |
134 |
63801106 |
Construction of Road from Mallick Gas Godwan to Dr B N Roy |
284791 |
Construction of Road from Mallick Gas Godwan to Dr B N Roy1 |
Completion of work |
-
latitude : 22.9071579,22.9072105
Longitude : 88.3823513,88.3823738
file name : Image_14112022140110117.png
|
2022-11-14 14:01:10.227131 |
135 |
63801106 |
Construction of Road from Mallick Gas Godwan to Dr B N Roy |
284791 |
Construction of Road from Mallick Gas Godwan to Dr B N Roy1 |
Completion of work |
-
latitude : 22.9072513,22.9072419
Longitude : 88.3821083,88.3820833
file name : Image_14112022140113538.png
|
2022-11-14 14:01:13.624937 |
136 |
63801106 |
Construction of Road from Mallick Gas Godwan to Dr B N Roy |
284791 |
Construction of Road from Mallick Gas Godwan to Dr B N Roy1 |
Completion of work |
-
latitude : 22.9072513,22.9072419
Longitude : 88.3821083,88.3820833
file name : Image_14112022140116943.png
|
2022-11-14 14:01:17.040639 |
137 |
63801106 |
Construction of Road from Mallick Gas Godwan to Dr B N Roy |
284791 |
Construction of Road from Mallick Gas Godwan to Dr B N Roy1 |
Completion of work |
-
latitude : 22.9073311,22.9072365,22.9071873
Longitude : 88.3813902,88.3824218,88.3824027
file name : Image_14112022135507336.png
|
2022-11-14 13:55:07.445994 |
138 |
63801106 |
Construction of Road from Mallick Gas Godwan to Dr B N Roy |
284791 |
Construction of Road from Mallick Gas Godwan to Dr B N Roy1 |
Completion of work |
-
latitude : 22.9073311,22.9072365,22.9071873
Longitude : 88.3813902,88.3824218,88.3824027
file name : Image_14112022135514382.png
|
2022-11-14 13:55:14.482023 |
139 |
63801106 |
Construction of Road from Mallick Gas Godwan to Dr B N Roy |
284791 |
Construction of Road from Mallick Gas Godwan to Dr B N Roy1 |
Completion of work |
-
latitude : 22.9075435,22.9075435
Longitude : 88.3825251,88.3825251
file name : Image_21102022143639051.png
|
2022-10-21 14:36:39.15204 |
140 |
63801106 |
Construction of Road from Mallick Gas Godwan to Dr B N Roy |
284791 |
Construction of Road from Mallick Gas Godwan to Dr B N Roy1 |
Completion of work |
-
latitude : 22.8922399,22.892431666666667
Longitude : 88.3768912,88.377315
file name : Image_05112022115934050.png
|
2022-11-05 11:59:34.187494 |
141 |
34939420 |
Construction of Concrite Drain Swapan Das via Malina Dutta to Gobinda Adhikari Gola |
118882 |
Construction of Concrite Drain Swapan Das via Malina Dutta to Gobinda Adhikari Gola 1 |
Completion of work |
-
latitude : 22.9074651,22.9074404
Longitude : 88.3813861,88.3813827
file name : Image_15112022083806428.png
|
2022-11-15 08:38:06.548424 |
142 |
34939420 |
Construction of Concrite Drain Swapan Das via Malina Dutta to Gobinda Adhikari Gola |
118882 |
Construction of Concrite Drain Swapan Das via Malina Dutta to Gobinda Adhikari Gola 1 |
Completion of work |
-
latitude : 22.907377,22.9073813
Longitude : 88.3814204,88.381414
file name : Image_14112022140248026.png
|
2022-11-14 14:02:48.139829 |
143 |
34939420 |
Construction of Concrite Drain Swapan Das via Malina Dutta to Gobinda Adhikari Gola |
118882 |
Construction of Concrite Drain Swapan Das via Malina Dutta to Gobinda Adhikari Gola 1 |
Completion of work |
-
latitude : 22.9080591,22.901515000000003
Longitude : 88.3817084,88.37693833333333
file name : Image_04112022131014228.png
|
2022-11-04 13:10:14.319778 |
144 |
49205152 |
CC Road from Bukan Das to Prasanta Biswas |
506439 |
CC Road from Bukan Das to Prasanta Biswas1 |
Completion of work |
-
latitude : 22.9047201,22.9047201
Longitude : 88.3765056,88.3765056
file name : Image_02012023171007716.png
|
2023-01-02 17:10:07.814203 |
145 |
49205152 |
CC Road from Bukan Das to Prasanta Biswas |
506439 |
CC Road from Bukan Das to Prasanta Biswas1 |
Completion of work |
-
latitude : 22.9134642,22.9138585
Longitude : 88.3820204,88.3820264
file name : Image_02012023164448326.png
|
2023-01-02 16:44:48.44005 |
146 |
34860716 |
CC Road from Ramesh Mukherjeeto Sukumar via from Dhrubo Hajra to Chitta Das |
76314 |
CC Road from Ramesh Mukherjeeto Sukumar via from Dhrubo Hajra to Chitta Das 1 |
Roof laid |
-
latitude : 22.9015057,22.9015828
Longitude : 88.3773036,88.377189
file name : Image_29122022115124775.png
|
2022-12-29 11:51:24.887289 |
147 |
34860716 |
CC Road from Ramesh Mukherjeeto Sukumar via from Dhrubo Hajra to Chitta Das |
76314 |
CC Road from Ramesh Mukherjeeto Sukumar via from Dhrubo Hajra to Chitta Das 1 |
Completion of work |
-
latitude : 22.904629999999997,22.90463666666667
Longitude : 88.37645333333333,88.37654666666667
file name : Image_21072021112312723.png
|
2021-07-21 11:23:12.804471 |
148 |
34860716 |
CC Road from Ramesh Mukherjeeto Sukumar via from Dhrubo Hajra to Chitta Das |
76314 |
CC Road from Ramesh Mukherjeeto Sukumar via from Dhrubo Hajra to Chitta Das 1 |
Completion of work |
-
latitude : 22.903335,22.902939999999997
Longitude : 88.3801788,88.379895
file name : Image_21072021112333087.png
|
2021-07-21 11:23:33.165255 |
149 |
34860716 |
CC Road from Ramesh Mukherjeeto Sukumar via from Dhrubo Hajra to Chitta Das |
76314 |
CC Road from Ramesh Mukherjeeto Sukumar via from Dhrubo Hajra to Chitta Das 1 |
Completion of work |
-
latitude : 22.902955,22.9030692,22.9033344
Longitude : 88.37989833333334,88.3802275,88.3801761
file name : Image_21072021112338950.png
|
2021-07-21 11:23:39.027868 |
150 |
34860716 |
CC Road from Ramesh Mukherjeeto Sukumar via from Dhrubo Hajra to Chitta Das |
76314 |
CC Road from Ramesh Mukherjeeto Sukumar via from Dhrubo Hajra to Chitta Das 1 |
Completion of work |
-
latitude : 22.9006483,22.9006333
Longitude : 88.3765422,88.3765411
file name : Image_21072021112423747.png
|
2021-07-21 11:24:23.830819 |
151 |
34860716 |
CC Road from Ramesh Mukherjeeto Sukumar via from Dhrubo Hajra to Chitta Das |
76314 |
CC Road from Ramesh Mukherjeeto Sukumar via from Dhrubo Hajra to Chitta Das 1 |
Completion of work |
-
latitude : 22.904601666666668,22.9044397
Longitude : 88.37651166666667,88.3766494
file name : Image_20072021132128145.png
|
2021-07-20 13:21:28.238451 |
152 |
34860716 |
CC Road from Ramesh Mukherjeeto Sukumar via from Dhrubo Hajra to Chitta Das |
76314 |
CC Road from Ramesh Mukherjeeto Sukumar via from Dhrubo Hajra to Chitta Das 1 |
Completion of work |
-
latitude : 22.9033359,22.9033361
Longitude : 88.3801722,88.3801689
file name : Image_14072021114616198.png
|
2021-07-14 11:46:16.310906 |
153 |
49235770 |
CC Drain Dhiren Malakar to Dipankar Halder |
132992 |
CC Drain Dhiren Malakar to Dipankar Halder1 |
Roof laid |
-
latitude : 22.902564999999996,22.9026908
Longitude : 88.37921,88.3796209
file name : Image_29122022115128245.png
|
2022-12-29 11:51:28.359746 |
154 |
49235770 |
CC Drain Dhiren Malakar to Dipankar Halder |
132992 |
CC Drain Dhiren Malakar to Dipankar Halder1 |
Roof laid |
-
latitude : 22.902564999999996,22.9026908
Longitude : 88.37921,88.3796209
file name : Image_29122022115131630.png
|
2022-12-29 11:51:31.744992 |
155 |
49235770 |
CC Drain Dhiren Malakar to Dipankar Halder |
132992 |
CC Drain Dhiren Malakar to Dipankar Halder1 |
Roof laid |
-
latitude : 22.902566666666665,22.90256
Longitude : 88.37923666666666,88.37922333333333
file name : Image_29122022115220541.png
|
2022-12-29 11:52:20.65577 |
156 |
49235770 |
CC Drain Dhiren Malakar to Dipankar Halder |
132992 |
CC Drain Dhiren Malakar to Dipankar Halder1 |
Plinth level |
-
latitude : 22.902474999999995,22.8997988
Longitude : 88.37950333333335,88.3769154
file name : Image_16122022110408960.png
|
2022-12-16 11:04:09.039677 |
157 |
49235770 |
CC Drain Dhiren Malakar to Dipankar Halder |
132992 |
CC Drain Dhiren Malakar to Dipankar Halder1 |
Plinth level |
-
latitude : 22.902566666666665,22.902530000000002
Longitude : 88.37953833333334,88.37956333333335
file name : Image_03122022120009195.png
|
2022-12-03 12:00:09.307827 |
158 |
49235770 |
CC Drain Dhiren Malakar to Dipankar Halder |
132992 |
CC Drain Dhiren Malakar to Dipankar Halder1 |
Completion of work |
-
latitude : 22.9026908,22.901558333333334
Longitude : 88.3796209,88.37697666666666
file name : Image_29112022082457124.png
|
2022-11-29 08:24:57.200854 |
159 |
49182923 |
CC road from Aikyatan Club to Bibekananda Moulick |
488453 |
CC road from Aikyatan Club to Bibekananda Moulick1 |
Completion of work |
-
latitude : 22.9047219,22.9047219
Longitude : 88.3765039,88.3765038
file name : Image_03012023132655487.png
|
2023-01-03 13:26:55.59132 |
160 |
49182923 |
CC road from Aikyatan Club to Bibekananda Moulick |
488453 |
CC road from Aikyatan Club to Bibekananda Moulick1 |
Completion of work |
-
latitude : 22.9047118,22.9047269
Longitude : 88.3764946,88.3764923
file name : Image_03012023132705541.png
|
2023-01-03 13:27:05.633006 |
161 |
49182923 |
CC road from Aikyatan Club to Bibekananda Moulick |
488453 |
CC road from Aikyatan Club to Bibekananda Moulick1 |
Completion of work |
-
latitude : 22.9047118,22.9047269
Longitude : 88.3764946,88.3764923
file name : Image_03012023132721705.png
|
2023-01-03 13:27:21.799733 |
162 |
49182923 |
CC road from Aikyatan Club to Bibekananda Moulick |
488453 |
CC road from Aikyatan Club to Bibekananda Moulick1 |
Completion of work |
-
latitude : 22.908769,22.9087862
Longitude : 88.3819511,88.3819469
file name : Image_03012023132922442.png
|
2023-01-03 13:29:22.550526 |
163 |
49212853 |
CC Road from Devid Banglo to Goutam Halder |
278950 |
CC Road from Devid Banglo to Goutam Halder1 |
Completion of work |
-
latitude : 22.902495,22.902488333333334
Longitude : 88.35765666666666,88.35763
file name : Image_03092022072745953.png
|
2022-09-03 07:27:46.064562 |
164 |
49212853 |
CC Road from Devid Banglo to Goutam Halder |
278950 |
CC Road from Devid Banglo to Goutam Halder1 |
Completion of work |
-
latitude : 22.90143333333333,22.90213833333333
Longitude : 88.37682000000001,88.35750000000002
file name : Image_25092022163818300.png
|
2022-09-25 16:38:18.406821 |
165 |
49212853 |
CC Road from Devid Banglo to Goutam Halder |
278950 |
CC Road from Devid Banglo to Goutam Halder1 |
Completion of work |
-
latitude : 22.902071666666664,22.902056666666667
Longitude : 88.35752333333333,88.35752166666667
file name : Image_18082022114223601.png
|
2022-08-18 11:42:23.728532 |
166 |
49233885 |
CC Drain Sarkar Pukur to GT Road via Narayanpur mandir Phase1 |
349579 |
CC Drain Sarkar Pukur to GT Road via Narayanpur mandir Phase11 |
Completion of work |
-
latitude : 22.9101795,22.9099622
Longitude : 88.3831958,88.3825916
file name : Image_30082022145718984.png
|
2022-08-30 14:57:19.089926 |
167 |
49233885 |
CC Drain Sarkar Pukur to GT Road via Narayanpur mandir Phase1 |
349579 |
CC Drain Sarkar Pukur to GT Road via Narayanpur mandir Phase11 |
Completion of work |
-
latitude : 22.9098159,22.9098408
Longitude : 88.3837166,88.3837178
file name : Image_19082022131534833.png
|
2022-08-19 13:15:34.925922 |
168 |
49233885 |
CC Drain Sarkar Pukur to GT Road via Narayanpur mandir Phase1 |
349579 |
CC Drain Sarkar Pukur to GT Road via Narayanpur mandir Phase11 |
Completion of work |
-
latitude : 22.9103401,22.91028
Longitude : 88.383249,88.3832568
file name : Image_17082022120329384.png
|
2022-08-17 12:03:29.4964 |
169 |
49236199 |
CC Drain Nemai Halder to Saraswati River via Rupamani Tudu |
349547 |
CC Drain Nemai Halder to Saraswati River via Rupamani Tudu1 |
Completion of work |
-
latitude : 22.8963269,22.896611666666665
Longitude : 88.3626558,88.36268999999999
file name : Image_02092022104923587.png
|
2022-09-02 10:49:23.712678 |
170 |
49236199 |
CC Drain Nemai Halder to Saraswati River via Rupamani Tudu |
349547 |
CC Drain Nemai Halder to Saraswati River via Rupamani Tudu1 |
Completion of work |
-
latitude : 22.896595,22.896625000000004
Longitude : 88.36271,88.362715
file name : Image_02092022105018150.png
|
2022-09-02 10:50:18.283295 |
171 |
49236199 |
CC Drain Nemai Halder to Saraswati River via Rupamani Tudu |
349547 |
CC Drain Nemai Halder to Saraswati River via Rupamani Tudu1 |
Completion of work |
-
latitude : 22.896576666666668,22.896433333333334
Longitude : 88.36411166666667,88.36382
file name : Image_18082022105917738.png
|
2022-08-18 10:59:17.852738 |
172 |
49211034 |
CC Road from Indrajit Banerjee to Jayanta Neyogi |
83473 |
CC Road from Indrajit Banerjee to Jayanta Neyogi1 |
Roof laid |
-
latitude : 22.90478333333333,22.9047188
Longitude : 88.37991500000001,88.3798438
file name : Image_29072022113743517.png
|
2022-07-29 11:37:43.618618 |
173 |
49211034 |
CC Road from Indrajit Banerjee to Jayanta Neyogi |
83473 |
CC Road from Indrajit Banerjee to Jayanta Neyogi1 |
Completion of work |
-
latitude : 22.9089281,22.9088739
Longitude : 88.3819067,88.3819261
file name : Image_20072022150526446.png
|
2022-07-20 15:05:26.572424 |
174 |
49211034 |
CC Road from Indrajit Banerjee to Jayanta Neyogi |
83473 |
CC Road from Indrajit Banerjee to Jayanta Neyogi1 |
Completion of work |
-
latitude : 22.8994827,22.8994994
Longitude : 88.3767306,88.3767254
file name : Image_13072022160732370.png
|
2022-07-13 16:07:32.463007 |
175 |
49232657 |
CC Drain Bukan Das to Prasanta Biswas |
299008 |
CC Drain Bukan Das to Prasanta Biswas1 |
Plinth level |
-
latitude : 22.9133027,22.9132534
Longitude : 88.3827274,88.3827392
file name : Image_30082022150348517.png
|
2022-08-30 15:03:48.650474 |
176 |
49232657 |
CC Drain Bukan Das to Prasanta Biswas |
299008 |
CC Drain Bukan Das to Prasanta Biswas1 |
Plinth level |
-
latitude : 22.9134429,22.9134813
Longitude : 88.3820082,88.3820455
file name : Image_19082022124834987.png
|
2022-08-19 12:48:35.1042 |
177 |
49232657 |
CC Drain Bukan Das to Prasanta Biswas |
299008 |
CC Drain Bukan Das to Prasanta Biswas1 |
Completion of work |
-
latitude : 22.9073432,22.9073928
Longitude : 88.3814428,88.3814164
file name : Image_29072022135232563.png
|
2022-07-29 13:52:32.720769 |
178 |
49232657 |
CC Drain Bukan Das to Prasanta Biswas |
299008 |
CC Drain Bukan Das to Prasanta Biswas1 |
Completion of work |
-
latitude : 22.9073638,22.9073516
Longitude : 88.3814239,88.3814452
file name : Image_29072022135544860.png
|
2022-07-29 13:55:45.019925 |
179 |
49235211 |
CC Drain Kanchan Singha to Lalu Biswas via Ramesh Ray |
266172 |
CC Drain Kanchan Singha to Lalu Biswas via Ramesh Ray1 |
Roof laid |
-
latitude : 22.901648333333334,22.900488333333335
Longitude : 88.37708666666667,88.37749166666666
file name : Image_05012023162734249.png
|
2023-01-05 16:27:34.36235 |
180 |
49235211 |
CC Drain Kanchan Singha to Lalu Biswas via Ramesh Ray |
266172 |
CC Drain Kanchan Singha to Lalu Biswas via Ramesh Ray1 |
Plinth level |
-
latitude : 22.9008536,22.9008207
Longitude : 88.3777991,88.3776591
file name : Image_14112022135511075.png
|
2022-11-14 13:55:11.182828 |
181 |
49235211 |
CC Drain Kanchan Singha to Lalu Biswas via Ramesh Ray |
266172 |
CC Drain Kanchan Singha to Lalu Biswas via Ramesh Ray1 |
Plinth level |
-
latitude : 22.9008536,22.9008207
Longitude : 88.3777991,88.3776591
file name : Image_14112022135504009.png
|
2022-11-14 13:55:04.106574 |
182 |
49226589 |
CC Road from Nemai Mondal to Santosh Nag |
225499 |
CC Road from Nemai Mondal to Santosh Nag1 |
Completion of work |
-
latitude : 22.9087256,22.9088189
Longitude : 88.3819524,88.3819452
file name : Image_03012023132830040.png
|
2023-01-03 13:28:30.14623 |
183 |
49238264 |
Maintanance of Tubewells at Differnt Sansad GP Area |
1200000 |
Maintanance of Tubewells at Differnt Sansad GP Area1 |
Roof laid |
-
latitude : 22.9047232
Longitude : 88.3765041
file name : Image_03012023132700175.png
|
2023-01-03 13:27:00.278345 |
184 |
49238264 |
Maintanance of Tubewells at Differnt Sansad GP Area |
1200000 |
Maintanance of Tubewells at Differnt Sansad GP Area1 |
Roof laid |
-
latitude : 22.9087841
Longitude : 88.3819417
file name : Image_03012023132711728.png
|
2023-01-03 13:27:11.828164 |
185 |
49238264 |
Maintanance of Tubewells at Differnt Sansad GP Area |
1200000 |
Maintanance of Tubewells at Differnt Sansad GP Area1 |
Roof laid |
-
latitude : 22.9047232
Longitude : 88.3765041
file name : Image_03012023132716892.png
|
2023-01-03 13:27:16.991995 |
186 |
49238264 |
Maintanance of Tubewells at Differnt Sansad GP Area |
1200000 |
Maintanance of Tubewells at Differnt Sansad GP Area1 |
Roof laid |
-
latitude : 22.9087841
Longitude : 88.3819417
file name : Image_03012023132727301.png
|
2023-01-03 13:27:27.412136 |
187 |
49238264 |
Maintanance of Tubewells at Differnt Sansad GP Area |
1200000 |
Maintanance of Tubewells at Differnt Sansad GP Area1 |
Plinth level |
-
latitude : 22.8900577
Longitude : 88.3749522
file name : Image_27092022164114655.png
|
2022-09-27 16:41:14.777687 |
188 |
49238264 |
Maintanance of Tubewells at Differnt Sansad GP Area |
1200000 |
Maintanance of Tubewells at Differnt Sansad GP Area1 |
Plinth level |
-
latitude : 22.904743333333332
Longitude : 88.37629999999999
file name : Image_27092022163113862.png
|
2022-09-27 16:31:13.984006 |
189 |
49211591 |
CC Road from Chandrasekhar Prasad to Pratap Chandra Saha |
129366 |
CC Road from Chandrasekhar Prasad to Pratap Chandra Saha1 |
Completion of work |
-
latitude : 22.9113998,22.9113773
Longitude : 88.3788636,88.3788301
file name : Image_02012023163925266.png
|
2023-01-02 16:39:25.366707 |
190 |
49211591 |
CC Road from Chandrasekhar Prasad to Pratap Chandra Saha |
129366 |
CC Road from Chandrasekhar Prasad to Pratap Chandra Saha1 |
Completion of work |
-
latitude : 22.9113799,22.9114317
Longitude : 88.3788925,88.378941
file name : Image_02012023164037347.png
|
2023-01-02 16:40:37.452476 |
191 |
49216209 |
CC Road from Krishna Majumder Kartik Debnath |
128455 |
CC Road from Krishna Majumder Kartik Debnath1 |
Roof laid |
-
latitude : 22.9088256,22.9088297
Longitude : 88.381927,88.3819376
file name : Image_08022023142217815.png
|
2023-02-08 14:22:17.90089 |
192 |
49216209 |
CC Road from Krishna Majumder Kartik Debnath |
128455 |
CC Road from Krishna Majumder Kartik Debnath1 |
Roof laid |
-
latitude : 22.8997803,22.9004542,22.9004542
Longitude : 88.3792922,88.3793176,88.3793176
file name : Image_08022023144036159.png
|
2023-02-08 14:40:36.272553 |
193 |
49216209 |
CC Road from Krishna Majumder Kartik Debnath |
128455 |
CC Road from Krishna Majumder Kartik Debnath1 |
Plinth level |
-
latitude : 22.900501666666667,22.900465
Longitude : 88.37953333333334,88.37956333333335
file name : Image_05012023093145680.png
|
2023-01-05 09:31:45.780614 |
194 |
49216209 |
CC Road from Krishna Majumder Kartik Debnath |
128455 |
CC Road from Krishna Majumder Kartik Debnath1 |
Plinth level |
-
latitude : 22.900516666666665,22.90075
Longitude : 88.37944999999999,88.3795818
file name : Image_05012023093502174.png
|
2023-01-05 09:35:02.268931 |
195 |
49216209 |
CC Road from Krishna Majumder Kartik Debnath |
128455 |
CC Road from Krishna Majumder Kartik Debnath1 |
Completion of work |
-
latitude : 22.9004542,22.9004542
Longitude : 88.3793176,88.3793176
file name : Image_02012023163918385.png
|
2023-01-02 16:39:18.485238 |
196 |
49216209 |
CC Road from Krishna Majumder Kartik Debnath |
128455 |
CC Road from Krishna Majumder Kartik Debnath1 |
Completion of work |
-
latitude : 22.9007508,22.9008295
Longitude : 88.3795729,88.3796209
file name : Image_02012023154617853.png
|
2023-01-02 15:46:17.964763 |
197 |
34932905 |
Construction of Concrete Road from Sabjuj Sangha Club to Basudeb Halder |
616192 |
Construction of Concrete Road from Sabjuj Sangha Club to Basudeb Halder1 |
Roof laid |
-
latitude : 22.9020537,22.9020082
Longitude : 88.3782041,88.3781761
file name : Image_05012023122353433.png
|
2023-01-05 12:23:53.549506 |
198 |
34932905 |
Construction of Concrete Road from Sabjuj Sangha Club to Basudeb Halder |
616192 |
Construction of Concrete Road from Sabjuj Sangha Club to Basudeb Halder1 |
Completion of work |
-
latitude : 22.9025335,22.9023159
Longitude : 88.378385,88.3783309
file name : Image_06122022112759743.png
|
2022-12-06 11:27:59.841934 |
199 |
34932905 |
Construction of Concrete Road from Sabjuj Sangha Club to Basudeb Halder |
616192 |
Construction of Concrete Road from Sabjuj Sangha Club to Basudeb Halder1 |
Completion of work |
-
latitude : 22.9025839,22.9025892
Longitude : 88.3784022,88.3784024
file name : Image_06122022112656035.png
|
2022-12-06 11:26:56.161578 |
200 |
34932905 |
Construction of Concrete Road from Sabjuj Sangha Club to Basudeb Halder |
616192 |
Construction of Concrete Road from Sabjuj Sangha Club to Basudeb Halder1 |
Completion of work |
-
latitude : 22.9017945,22.90143833333333,22.902083333333334
Longitude : 88.3778363,88.37688833333335,88.37778166666666
file name : Image_06122022111630234.png
|
2022-12-06 11:16:30.325264 |
201 |
49207860 |
CC Road from Dipak Mondal to Bikash Ray via Bijan Ray |
34617 |
CC Road from Dipak Mondal to Bikash Ray via Bijan Ray1 |
Completion of work |
-
latitude : 22.9113648,22.9108033
Longitude : 88.3827776,88.3823213
file name : Image_02012023165102623.png
|
2023-01-02 16:51:02.744771 |
202 |
49185184 |
CC Road from Puppy Singh to Mritunjay De |
812327 |
CC Road from Puppy Singh to Mritunjay De1 |
Roof laid |
-
latitude : 22.9148411,22.9149007
Longitude : 88.3832764,88.383277
file name : Image_02012023164731734.png
|
2023-01-02 16:47:31.858141 |
203 |
49185184 |
CC Road from Puppy Singh to Mritunjay De |
812327 |
CC Road from Puppy Singh to Mritunjay De1 |
Completion of work |
-
latitude : 22.9148866,22.9148866
Longitude : 88.3832949,88.3832949
file name : Image_29112022150241906.png
|
2022-11-29 15:02:42.00683 |
204 |
49185184 |
CC Road from Puppy Singh to Mritunjay De |
812327 |
CC Road from Puppy Singh to Mritunjay De1 |
Completion of work |
-
latitude : 22.9148562,22.9148562
Longitude : 88.3832927,88.3832927
file name : Image_29112022145107596.png
|
2022-11-29 14:51:07.743732 |
205 |
49185184 |
CC Road from Puppy Singh to Mritunjay De |
812327 |
CC Road from Puppy Singh to Mritunjay De1 |
Completion of work |
-
latitude : 22.9148819,22.9149445
Longitude : 88.383309,88.3833199
file name : Image_15112022135225760.png
|
2022-11-15 13:52:25.879259 |
206 |
49185184 |
CC Road from Puppy Singh to Mritunjay De |
812327 |
CC Road from Puppy Singh to Mritunjay De1 |
Completion of work |
-
latitude : 22.9150527,22.9150568
Longitude : 88.3833143,88.3833116
file name : Image_15112022135333120.png
|
2022-11-15 13:53:33.22024 |
207 |
63801148 |
Maintenance of ICDS Centers |
350000 |
Maintenance of ICDS Centers1 |
Completion of work |
-
latitude : 22.9102758
Longitude : 88.3827023
file name : Image_02012023165523662.png
|
2023-01-02 16:55:23.781468 |
208 |
49236046 |
CC Drain Prasanya Barman to Panchu Dey |
226057 |
CC Drain Prasanya Barman to Panchu Dey1 |
Completion of work |
-
latitude : 22.9039474,22.9039469
Longitude : 88.3792624,88.3792535
file name : Image_21082022111542975.png
|
2022-08-21 11:15:43.056012 |
209 |
49230677 |
CC Drain Nirapada Pal to Tripurai Babu |
369504 |
CC Drain Nirapada Pal to Tripurai Babu1 |
Completion of work |
-
latitude : 22.9115248,22.9114911
Longitude : 88.3759482,88.3759425
file name : Image_04022023124810077.png
|
2023-02-04 12:48:10.186617 |
210 |
49229475 |
Maintanance of Electrical poll tapping streetlight with led under GP area |
299881 |
Maintanance of Electrical poll tapping streetlight with led under GP area1 |
Completion of work |
-
latitude : 22.907308333333336
Longitude : 88.36743833333334
file name : Image_19012023151116822.png
|
2023-01-19 15:11:16.924373 |
211 |
49229475 |
Maintanance of Electrical poll tapping streetlight with led under GP area |
299881 |
Maintanance of Electrical poll tapping streetlight with led under GP area1 |
Completion of work |
-
latitude : 22.9089004
Longitude : 88.3819288
file name : Image_04012023131122320.png
|
2023-01-04 13:11:22.448934 |
212 |
49229475 |
Maintanance of Electrical poll tapping streetlight with led under GP area |
299881 |
Maintanance of Electrical poll tapping streetlight with led under GP area1 |
Completion of work |
-
latitude : 22.9088803
Longitude : 88.3819372
file name : Image_04012023131550742.png
|
2023-01-04 13:15:50.883418 |
213 |
49229475 |
Maintanance of Electrical poll tapping streetlight with led under GP area |
299881 |
Maintanance of Electrical poll tapping streetlight with led under GP area1 |
Completion of work |
-
latitude : 22.9104331
Longitude : 88.3828528
file name : Image_02012023165244998.png
|
2023-01-02 16:52:45.125872 |
214 |
49235077 |
CC Drain Sanjay Das to Nikhil Halder |
234281 |
CC Drain Sanjay Das to Nikhil Halder1 |
Plinth level |
-
latitude : 22.91142,22.9038472
Longitude : 88.38371833333333,88.377469
file name : Image_24012023133927762.png
|
2023-01-24 13:39:27.891663 |
215 |
49235077 |
CC Drain Sanjay Das to Nikhil Halder |
234281 |
CC Drain Sanjay Das to Nikhil Halder1 |
Plinth level |
-
latitude : 22.903847,22.9030476
Longitude : 88.3774714,88.3781044
file name : Image_24012023134028256.png
|
2023-01-24 13:40:28.441628 |
216 |
49235077 |
CC Drain Sanjay Das to Nikhil Halder |
234281 |
CC Drain Sanjay Das to Nikhil Halder1 |
Completion of work |
-
latitude : 22.903764,22.9037641
Longitude : 88.3772133,88.3772131
file name : Image_16122022111220591.png
|
2022-12-16 11:12:20.705406 |
217 |
49235077 |
CC Drain Sanjay Das to Nikhil Halder |
234281 |
CC Drain Sanjay Das to Nikhil Halder1 |
Completion of work |
-
latitude : 22.903764,22.9037641
Longitude : 88.3772133,88.3772131
file name : Image_16122022111226994.png
|
2022-12-16 11:12:27.089319 |
218 |
59310911 |
Construction of Drain infront of Gitanjali Sangha to Chowrangi Morh |
333469 |
Construction of Drain infront of Gitanjali Sangha to Chowrangi Morh1 |
Completion of work |
-
latitude : 22.8997811,22.8997698
Longitude : 88.3792929,88.3792839
file name : Image_07022023065640699.png
|
2023-02-07 06:56:40.813211 |
219 |
59310911 |
Construction of Drain infront of Gitanjali Sangha to Chowrangi Morh |
333469 |
Construction of Drain infront of Gitanjali Sangha to Chowrangi Morh1 |
Completion of work |
-
latitude : 22.9115531,22.9115445
Longitude : 88.3760128,88.3760161
file name : Image_04022023131218849.png
|
2023-02-04 13:12:18.928091 |
220 |
59327532 |
CC Road from Rajlaxmi Pharmecy to Kishor Dutta via Sanjay Das |
234750 |
CC Road from Rajlaxmi Pharmecy to Kishor Dutta via Sanjay Das1 |
Completion of work |
-
latitude : 22.9034905,22.9034905,22.903023333333334
Longitude : 88.3825419,88.3825419,88.38241500000001
file name : Image_07022023144623973.png
|
2023-02-07 14:46:24.09886 |
221 |
49237128 |
Purchasing of Tubewell materials for repairing all sansad under GP area |
1380751 |
Purchasing of Tubewell materials for repairing all sansad under GP area1 |
Completion of work |
-
latitude : 22.9088316
Longitude : 88.3819264
file name : Image_13022023120902825.png
|
2023-02-13 12:09:02.910515 |
222 |
49237128 |
Purchasing of Tubewell materials for repairing all sansad under GP area |
1380751 |
Purchasing of Tubewell materials for repairing all sansad under GP area1 |
Completion of work |
-
latitude : 22.9088677
Longitude : 88.3819152
file name : Image_09022023160209446.png
|
2023-02-09 16:02:09.535248 |
223 |
49240933 |
Repairing or Maintance of Tubewell plantforms |
349998 |
Repairing or Maintance of Tubewell plantforms1 |
Plinth level |
-
latitude : 22.9087715
Longitude : 88.3818818
file name : Image_13032023153025441.png
|
2023-03-13 15:30:25.532518 |
224 |
59308318 |
CC Road from Sushanta Mallick to Shobha Biswas |
333469 |
CC Road from Sushanta Mallick to Shobha Biswas1 |
Roof laid |
-
latitude : 22.9013007,22.9009384
Longitude : 88.3821688,88.3822153
file name : Image_23022023134735537.png
|
2023-02-23 13:47:35.636847 |
225 |
59308318 |
CC Road from Sushanta Mallick to Shobha Biswas |
333469 |
CC Road from Sushanta Mallick to Shobha Biswas1 |
Completion of work |
-
latitude : 22.9008694,22.900888
Longitude : 88.3822802,88.3822688
file name : Image_13022023120906721.png
|
2023-02-13 12:09:06.814168 |
226 |
59308318 |
CC Road from Sushanta Mallick to Shobha Biswas |
333469 |
CC Road from Sushanta Mallick to Shobha Biswas1 |
Completion of work |
-
latitude : 22.9008694,22.900888
Longitude : 88.3822802,88.3822688
file name : Image_13022023120910562.png
|
2023-02-13 12:09:10.647892 |
227 |
59308318 |
CC Road from Sushanta Mallick to Shobha Biswas |
333469 |
CC Road from Sushanta Mallick to Shobha Biswas1 |
Completion of work |
-
latitude : 22.8997805,22.8997805
Longitude : 88.3792932,88.3792932
file name : Image_07022023140617179.png
|
2023-02-07 14:06:17.263064 |
228 |
49235657 |
CC Drain Binay Chatterjee to Jhil via rabindra Sangha Club to Naba Sil |
509638 |
CC Drain Binay Chatterjee to Jhil via rabindra Sangha Club to Naba Sil1 |
Plinth level |
-
latitude : 22.897581,22.8981905
Longitude : 88.3801021,88.3790979
file name : Image_25022023120323876.png
|
2023-02-25 12:03:23.966068 |
229 |
49235657 |
CC Drain Binay Chatterjee to Jhil via rabindra Sangha Club to Naba Sil |
509638 |
CC Drain Binay Chatterjee to Jhil via rabindra Sangha Club to Naba Sil1 |
Plinth level |
-
latitude : 22.9011174,22.9011174
Longitude : 88.3828059,88.3828059
file name : Image_09032023151917459.png
|
2023-03-09 15:19:17.560869 |
230 |
49235657 |
CC Drain Binay Chatterjee to Jhil via rabindra Sangha Club to Naba Sil |
509638 |
CC Drain Binay Chatterjee to Jhil via rabindra Sangha Club to Naba Sil1 |
Completion of work |
-
latitude : 22.8995382,22.8993185
Longitude : 88.3803908,88.3808122
file name : Image_07022023144913144.png
|
2023-02-07 14:49:13.277702 |
231 |
67157333 |
Cc Road Naraayan Kundu to Shymal Pal via Srikanta Mistri |
511215 |
Cc Road Naraayan Kundu to Shymal Pal via Srikanta Mistri1 |
Plinth level |
-
latitude : 22.901473333333335,22.9019278
Longitude : 88.37754000000001,88.3778011
file name : Image_14032023125211988.png
|
2023-03-14 12:52:12.121607 |
232 |
67157333 |
Cc Road Naraayan Kundu to Shymal Pal via Srikanta Mistri |
511215 |
Cc Road Naraayan Kundu to Shymal Pal via Srikanta Mistri1 |
Plinth level |
-
latitude : 22.901175,22.90122666666667
Longitude : 88.37791833333334,88.37792166666668
file name : Image_17032023091918569.png
|
2023-03-17 09:19:18.667395 |
233 |
67157333 |
Cc Road Naraayan Kundu to Shymal Pal via Srikanta Mistri |
511215 |
Cc Road Naraayan Kundu to Shymal Pal via Srikanta Mistri1 |
Completion of work |
-
latitude : 22.900723333333335,22.900465,22.900575000000003
Longitude : 88.37659166666666,88.37701666666665,88.377125
file name : Image_13032023104358650.png
|
2023-03-13 10:43:58.761256 |
234 |
67157333 |
Cc Road Naraayan Kundu to Shymal Pal via Srikanta Mistri |
511215 |
Cc Road Naraayan Kundu to Shymal Pal via Srikanta Mistri1 |
Completion of work |
-
latitude : 22.900638333333337,22.900660000000002
Longitude : 88.37723333333334,88.37726333333333
file name : Image_13032023104507087.png
|
2023-03-13 10:45:07.185961 |
235 |
59237174 |
CC Drain from Sharmistha Dutta to Mamata Ray |
132385 |
CC Drain from Sharmistha Dutta to Mamata Ray1 |
Completion of work |
-
latitude : 22.9110068,22.9109541
Longitude : 88.3790836,88.3791658
file name : Image_01042023132218752.png
|
2023-04-01 13:22:18.89859 |
236 |
67157308 |
CC Road from Rajen Halder to farm Panchil via Agri Deep Tubewell |
344608 |
CC Road from Rajen Halder to farm Panchil via Agri Deep Tubewell1 |
Plinth level |
-
latitude : 22.900186666666666,22.90019333333333
Longitude : 88.36276166666667,88.36274333333334
file name : Image_06042023113856630.png
|
2023-04-06 11:38:56.763476 |
237 |
67157308 |
CC Road from Rajen Halder to farm Panchil via Agri Deep Tubewell |
344608 |
CC Road from Rajen Halder to farm Panchil via Agri Deep Tubewell1 |
Completion of work |
-
latitude : 22.900585,22.900585,22.900585
Longitude : 88.377105,88.37714333333334,88.37714333333334
file name : Image_13032023121439854.png
|
2023-03-13 12:14:39.947493 |
238 |
67157350 |
CC Road from Akna Natunpara house of Mritunjay barui to Susanta Das near Shib Mandir |
687206 |
CC Road from Akna Natunpara house of Mritunjay barui to Susanta Das near Shib Mandir1 |
Completion of work |
-
latitude : 22.90149666666667,22.9101502
Longitude : 88.376905,88.3666206
file name : Image_01042023131454431.png
|
2023-04-01 13:14:54.526816 |
239 |
67157350 |
CC Road from Akna Natunpara house of Mritunjay barui to Susanta Das near Shib Mandir |
687206 |
CC Road from Akna Natunpara house of Mritunjay barui to Susanta Das near Shib Mandir1 |
Completion of work |
-
latitude : 22.909088333333337,22.909088333333337
Longitude : 88.36727,88.36723166666667
file name : Image_24032023115152390.png
|
2023-03-24 11:51:52.498983 |
240 |
67157289 |
Creation of drainage channel for management of grey water |
325748 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.9112872
Longitude : 88.3839846
file name : Image_19052023083131530.png
|
2023-05-19 08:31:31.629188 |
241 |
67157289 |
Creation of drainage channel for management of grey water |
325748 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.911106
Longitude : 88.383866
file name : Image_06042023141119656.png
|
2023-04-06 14:11:19.74318 |
242 |
67157289 |
Creation of drainage channel for management of grey water |
325748 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.9112131
Longitude : 88.3839027
file name : Image_06042023140846270.png
|
2023-04-06 14:08:46.3619 |
243 |
59339744 |
CC Drain from Uttarayan Flat to Raja Chakraborty |
349983 |
CC Drain from Uttarayan Flat to Raja Chakraborty1 |
Completion of work |
-
latitude : 22.900978333333335,22.90248166666667
Longitude : 88.37685833333335,88.37957666666668
file name : Image_02052023162635902.png
|
2023-05-02 16:26:35.994657 |
244 |
59339744 |
CC Drain from Uttarayan Flat to Raja Chakraborty |
349983 |
CC Drain from Uttarayan Flat to Raja Chakraborty1 |
Completion of work |
-
latitude : 22.9040353,22.9041001
Longitude : 88.3803688,88.3803849
file name : Image_17032023091922179.png
|
2023-03-17 09:19:22.261371 |
245 |
59315212 |
CC Drain of Binay Chatterjee to Jhill |
337642 |
CC Drain of Binay Chatterjee to Jhill1 |
Roof laid |
-
latitude : 22.902744999999996,22.902763333333336
Longitude : 88.37626833333334,88.37627833333333
file name : Image_21042023112215634.png
|
2023-04-21 11:22:15.730316 |
246 |
59315212 |
CC Drain of Binay Chatterjee to Jhill |
337642 |
CC Drain of Binay Chatterjee to Jhill1 |
Roof laid |
-
latitude : 22.902789999999996,22.90279666666667
Longitude : 88.37632,88.37631000000002
file name : Image_24032023112840191.png
|
2023-03-24 11:28:40.296275 |
247 |
59315212 |
CC Drain of Binay Chatterjee to Jhill |
337642 |
CC Drain of Binay Chatterjee to Jhill1 |
Plinth level |
-
latitude : 22.90162,22.9036967
Longitude : 88.37687,88.3767248
file name : Image_28022023061145544.png
|
2023-02-28 06:11:45.623671 |
248 |
59315212 |
CC Drain of Binay Chatterjee to Jhill |
337642 |
CC Drain of Binay Chatterjee to Jhill1 |
Completion of work |
-
latitude : 22.9032959,22.90281,22.902823333333338
Longitude : 88.3767955,88.37626,88.37626
file name : Image_23022023101105352.png
|
2023-02-23 10:11:05.448338 |
249 |
35203988 |
Maintenance of Tubewells at different sansad under GP |
1100000 |
Maintenance of Tubewells at different sansad under GP1 |
Plinth level |
-
latitude : 22.904775000000004
Longitude : 88.37627833333333
file name : Image_27092022161458004.png
|
2022-09-27 16:14:58.135566 |
250 |
35203988 |
Maintenance of Tubewells at different sansad under GP |
1100000 |
Maintenance of Tubewells at different sansad under GP1 |
Plinth level |
-
latitude : 22.9087482
Longitude : 88.3819646
file name : Image_27092022140125511.png
|
2022-09-27 14:01:25.615575 |
251 |
35203988 |
Maintenance of Tubewells at different sansad under GP |
1100000 |
Maintenance of Tubewells at different sansad under GP1 |
Plinth level |
-
latitude : 22.9088078
Longitude : 88.3819491
file name : Image_27092022140129652.png
|
2022-09-27 14:01:29.766359 |
252 |
35203988 |
Maintenance of Tubewells at different sansad under GP |
1100000 |
Maintenance of Tubewells at different sansad under GP1 |
Plinth level |
-
latitude : 22.9088131
Longitude : 88.38195
file name : Image_27092022140134100.png
|
2022-09-27 14:01:34.197359 |
253 |
35203988 |
Maintenance of Tubewells at different sansad under GP |
1100000 |
Maintenance of Tubewells at different sansad under GP1 |
Plinth level |
-
latitude : 22.9087448
Longitude : 88.3819625
file name : Image_27092022140137935.png
|
2022-09-27 14:01:38.040925 |
254 |
35203988 |
Maintenance of Tubewells at different sansad under GP |
1100000 |
Maintenance of Tubewells at different sansad under GP1 |
Plinth level |
-
latitude : 22.9087482
Longitude : 88.3819646
file name : Image_27092022140142026.png
|
2022-09-27 14:01:42.115387 |
255 |
35203988 |
Maintenance of Tubewells at different sansad under GP |
1100000 |
Maintenance of Tubewells at different sansad under GP1 |
Plinth level |
-
latitude : 22.9088078
Longitude : 88.3819491
file name : Image_27092022140146170.png
|
2022-09-27 14:01:46.267845 |
256 |
35203988 |
Maintenance of Tubewells at different sansad under GP |
1100000 |
Maintenance of Tubewells at different sansad under GP1 |
Plinth level |
-
latitude : 22.9088131
Longitude : 88.38195
file name : Image_27092022140150683.png
|
2022-09-27 14:01:50.812316 |
257 |
35203988 |
Maintenance of Tubewells at different sansad under GP |
1100000 |
Maintenance of Tubewells at different sansad under GP1 |
Plinth level |
-
latitude : 22.9087598
Longitude : 88.381968
file name : Image_27092022140257446.png
|
2022-09-27 14:02:57.539527 |
258 |
35203988 |
Maintenance of Tubewells at different sansad under GP |
1100000 |
Maintenance of Tubewells at different sansad under GP1 |
Completion of work |
-
latitude : 22.904698333333332
Longitude : 88.37635833333334
file name : Image_13072021074545145.png
|
2021-07-13 07:45:45.227537 |
259 |
35203988 |
Maintenance of Tubewells at different sansad under GP |
1100000 |
Maintenance of Tubewells at different sansad under GP1 |
Completion of work |
-
latitude : 22.9044223
Longitude : 88.3766444
file name : Image_13072021074551903.png
|
2021-07-13 07:45:51.990749 |
260 |
35203988 |
Maintenance of Tubewells at different sansad under GP |
1100000 |
Maintenance of Tubewells at different sansad under GP1 |
Completion of work |
-
latitude : 22.9011028
Longitude : 88.3768094
file name : Image_15062021140359677.png
|
2021-06-15 14:03:59.760251 |
261 |
35203988 |
Maintenance of Tubewells at different sansad under GP |
1100000 |
Maintenance of Tubewells at different sansad under GP99 |
Completion of work |
-
latitude : 22.904706666666666
Longitude : 88.37628666666666
file name : Image_13072021074548645.png
|
2021-07-13 07:45:48.732974 |
262 |
35084835 |
Purchasing of Tubewell materials For Repearing or Maintenance of Tubewelles are All Sansad |
1600000 |
Purchasing of Tubewell materials For Repearing or Maintenance of Tubewelles are All Sansad1 |
Completion of work |
-
latitude : 22.8916867
Longitude : 88.3728884
file name : Image_29112021142903913.png
|
2021-11-29 14:29:04.010798 |
263 |
35084835 |
Purchasing of Tubewell materials For Repearing or Maintenance of Tubewelles are All Sansad |
1600000 |
Purchasing of Tubewell materials For Repearing or Maintenance of Tubewelles are All Sansad1 |
Completion of work |
-
latitude : 22.8920149
Longitude : 88.3727168
file name : Image_29112021143008919.png
|
2021-11-29 14:30:09.066177 |
264 |
35084835 |
Purchasing of Tubewell materials For Repearing or Maintenance of Tubewelles are All Sansad |
1600000 |
Purchasing of Tubewell materials For Repearing or Maintenance of Tubewelles are All Sansad1 |
Completion of work |
-
latitude : 22.8917649
Longitude : 88.3728256
file name : Image_29112021142618409.png
|
2021-11-29 14:26:18.536598 |
265 |
35084835 |
Purchasing of Tubewell materials For Repearing or Maintenance of Tubewelles are All Sansad |
1600000 |
Purchasing of Tubewell materials For Repearing or Maintenance of Tubewelles are All Sansad1 |
Completion of work |
-
latitude : 22.8912817
Longitude : 88.3722985
file name : Image_29112021142333696.png
|
2021-11-29 14:23:33.792936 |
266 |
67157408 |
CC road from Nirmal Dey to Asoke Biswas |
99811 |
CC road from Nirmal Dey to Asoke Biswas1 |
Completion of work |
-
latitude : 22.90138,22.90138
Longitude : 88.3775063,88.3775063
file name : Image_18052023162412843.png
|
2023-05-18 16:24:12.938857 |
267 |
67157408 |
CC road from Nirmal Dey to Asoke Biswas |
99811 |
CC road from Nirmal Dey to Asoke Biswas1 |
Completion of work |
-
latitude : 22.9013779,22.9013779
Longitude : 88.3775003,88.3775025
file name : Image_18052023162415819.png
|
2023-05-18 16:24:15.933274 |
268 |
59392070 |
Construction of Dustbin Tub in All Sansad under GP area |
200000 |
Construction of Dustbin Tub in All Sansad under GP area1 |
Completion of work |
-
latitude : 22.9128694
Longitude : 88.3825329
file name : Image_19052023083837175.png
|
2023-05-19 08:38:37.279887 |
269 |
67157359 |
CC Road from Sanjay Das to Chinmoy Karmakar |
349559 |
CC Road from Sanjay Das to Chinmoy Karmakar1 |
Completion of work |
-
latitude : 22.9122902,22.9122902,22.9122725
Longitude : 88.3801744,88.3801744,88.3801757
file name : Image_11052023161409310.png
|
2023-05-11 16:14:09.416543 |
270 |
67157359 |
CC Road from Sanjay Das to Chinmoy Karmakar |
349559 |
CC Road from Sanjay Das to Chinmoy Karmakar1 |
Completion of work |
-
latitude : 22.9122795,22.9122751
Longitude : 88.3801963,88.3802046
file name : Image_04052023165159951.png
|
2023-05-04 16:52:00.057976 |
271 |
67157376 |
CC Road Arati Bose to Pranab Chatterje via Saraswati Acharya |
162425 |
CC Road Arati Bose to Pranab Chatterje via Saraswati Acharya1 |
Completion of work |
-
latitude : 22.9074136,22.9074522
Longitude : 88.3811819,88.3812804
file name : Image_19052023085046643.png
|
2023-05-19 08:50:46.723974 |
272 |
67157376 |
CC Road Arati Bose to Pranab Chatterje via Saraswati Acharya |
162425 |
CC Road Arati Bose to Pranab Chatterje via Saraswati Acharya1 |
Completion of work |
-
latitude : 22.907014,22.907014
Longitude : 88.3809075,88.3809075
file name : Image_19052023085200771.png
|
2023-05-19 08:52:00.854959 |
273 |
67157249 |
Creation of drainage channel for management of grey water |
349890 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.9091201,22.9091254
Longitude : 88.3828355,88.3829669
file name : Image_19052023084717397.png
|
2023-05-19 08:47:17.481335 |
274 |
67157249 |
Creation of drainage channel for management of grey water |
349890 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.9016102,22.9015701
Longitude : 88.3772149,88.3772626
file name : Image_21042023112219234.png
|
2023-04-21 11:22:19.325616 |
275 |
67157249 |
Creation of drainage channel for management of grey water |
349890 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.9016102,22.9015701
Longitude : 88.3772149,88.3772626
file name : Image_21042023112224416.png
|
2023-04-21 11:22:24.508226 |
276 |
67157249 |
Creation of drainage channel for management of grey water |
349890 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.90059833333333,22.90059833333333
Longitude : 88.37724166666666,88.37724166666666
file name : Image_13032023121124272.png
|
2023-03-13 12:11:24.369853 |
277 |
67157249 |
Creation of drainage channel for management of grey water |
349890 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.900609999999997,22.8995631
Longitude : 88.377075,88.3768205
file name : Image_13032023121232295.png
|
2023-03-13 12:12:32.385253 |
278 |
80456778 |
Creation of drainage channel for management of grey water |
162000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.900840000000002
Longitude : 88.376805
file name : Image_25072023110410323.png
|
2023-07-25 11:04:10.40173 |
279 |
59030375 |
CC Road from Shukla Mukherjee to Sanjay Biswas |
304786 |
CC Road from Shukla Mukherjee to Sanjay Biswas1 |
Completion of work |
-
latitude : 22.901474999999998,22.901383333333335
Longitude : 88.37704000000001,88.37704833333333
file name : Image_22072023130829735.png
|
2023-07-22 13:08:29.832391 |
280 |
59030375 |
CC Road from Shukla Mukherjee to Sanjay Biswas |
304786 |
CC Road from Shukla Mukherjee to Sanjay Biswas1 |
Completion of work |
-
latitude : 22.901455000000002,22.901398333333336
Longitude : 88.37702499999999,88.377035
file name : Image_20072023124445947.png
|
2023-07-20 12:44:46.162776 |
281 |
59030375 |
CC Road from Shukla Mukherjee to Sanjay Biswas |
304786 |
CC Road from Shukla Mukherjee to Sanjay Biswas1 |
Completion of work |
-
latitude : 22.9014014,22.9014017
Longitude : 88.3775217,88.3775251
file name : Image_20072023123355167.png
|
2023-07-20 12:33:55.39325 |
282 |
86759105 |
CC Road from Sanjay Das to Sanjib Dakua at Khudiram pally |
140000 |
CC Road from Sanjay Das to Sanjib Dakua at Khudiram pally1 |
Completion of work |
-
latitude : 22.909,22.9112997
Longitude : 88.38180499999999,88.3787772
file name : Image_07082023154741366.png
|
2023-08-07 15:47:41.459196 |
283 |
86759105 |
CC Road from Sanjay Das to Sanjib Dakua at Khudiram pally |
140000 |
CC Road from Sanjay Das to Sanjib Dakua at Khudiram pally1 |
Completion of work |
-
latitude : 22.9044484,22.9044458
Longitude : 88.3766191,88.376619
file name : Image_01082023114639132.png
|
2023-08-01 11:46:39.242217 |
284 |
59395033 |
Purchasing of Tubewell materials for reparing or Maintenance of Tube wells are all Sansad Under GP |
1200000 |
Purchasing of Tubewell materials for reparing or Maintenance of Tube wells are all Sansad Under GP1 |
Completion of work |
-
latitude : 22.9082936
Longitude : 88.3703053
file name : Image_08082023123305101.png
|
2023-08-08 12:33:05.181242 |
285 |
67157231 |
Creation of drainage channel for management of grey water |
111922 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.901474999999998,22.906363333333335,22.906335
Longitude : 88.37696333333334,88.37114000000001,88.37094333333334
file name : Image_08082023123300677.png
|
2023-08-08 12:33:00.75265 |
286 |
67157231 |
Creation of drainage channel for management of grey water |
111922 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.90125833333333,22.901261666666663
Longitude : 88.37542166666665,88.37538166666667
file name : Image_08082023113830602.png
|
2023-08-08 11:38:30.769709 |
287 |
72348423 |
Construction of roads |
129293 |
Construction of roads1 |
Roof laid |
-
latitude : 22.9023062,22.9023062
Longitude : 88.3784077,88.3784077
file name : Image_12022024154353959.png
|
2024-02-12 15:43:54.071432 |
288 |
72348423 |
Construction of roads |
129293 |
Construction of roads1 |
Plinth level |
-
latitude : 22.90246666666667,22.90246666666667
Longitude : 88.37874666666667,88.37874666666667
file name : Image_15012024160121136.png
|
2024-01-15 16:01:21.235379 |
289 |
72348423 |
Construction of roads |
129293 |
Construction of roads1 |
Completion of work |
-
latitude : 22.902448333333336,22.902448333333336
Longitude : 88.3787,88.3787
file name : Image_14122023145359927.png
|
2023-12-14 14:54:00.019477 |
290 |
72363583 |
Construction of roads |
214302 |
Construction of roads1 |
Roof laid |
-
latitude : 22.9100901,22.9100901
Longitude : 88.3662487,88.3662487
file name : Image_26122023145812651.png
|
2023-12-26 14:58:12.791311 |
291 |
72363583 |
Construction of roads |
214302 |
Construction of roads1 |
Plinth level |
-
latitude : 22.9066217,22.9066217
Longitude : 88.3825657,88.3825657
file name : Image_20122023132524101.png
|
2023-12-20 13:25:24.240451 |
292 |
72363583 |
Construction of roads |
214302 |
Construction of roads1 |
Completion of work |
-
latitude : 22.91065,22.91065
Longitude : 88.36662333333334,88.36662333333334
file name : Image_13122023154705578.png
|
2023-12-13 15:47:05.676136 |
293 |
72255726 |
Drainage Construction |
217941 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.9121447
Longitude : 88.3631757
file name : Image_26122023152904507.png
|
2023-12-26 15:29:04.586079 |
294 |
72255726 |
Drainage Construction |
217941 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.9125117
Longitude : 88.3626729
file name : Image_14122023151458716.png
|
2023-12-14 15:14:58.828488 |
295 |
72255726 |
Drainage Construction |
217941 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.9121592
Longitude : 88.3631756
file name : Image_13122023152939033.png
|
2023-12-13 15:29:39.129321 |
296 |
72302399 |
Construction and Maintenance of Classroom Flooring |
200000 |
Construction and Maintenance of Classroom Flooring1 |
Roof laid |
-
latitude : 22.903328333333334
Longitude : 88.37596833333333
file name : Image_07022024150322563.png
|
2024-02-07 15:03:22.656101 |
297 |
72302399 |
Construction and Maintenance of Classroom Flooring |
200000 |
Construction and Maintenance of Classroom Flooring1 |
Plinth level |
-
latitude : 22.90330666666667
Longitude : 88.37589833333335
file name : Image_26122023144509340.png
|
2023-12-26 14:45:09.426703 |
298 |
72302399 |
Construction and Maintenance of Classroom Flooring |
200000 |
Construction and Maintenance of Classroom Flooring1 |
Completion of work |
-
latitude : 22.8984158
Longitude : 88.3793265
file name : Image_18122023151355922.png
|
2023-12-18 15:13:56.072209 |
299 |
72341915 |
Construction of roads |
129425 |
Construction of roads1 |
Roof laid |
-
latitude : 22.8981961,22.8981961
Longitude : 88.3791513,88.3791513
file name : Image_15012024154531649.png
|
2024-01-15 15:45:31.733646 |
300 |
72341915 |
Construction of roads |
129425 |
Construction of roads1 |
Roof laid |
-
latitude : 22.8982003,22.8982003
Longitude : 88.3791557,88.3791557
file name : Image_09012024153700654.png
|
2024-01-09 15:37:00.746718 |
301 |
72341915 |
Construction of roads |
129425 |
Construction of roads1 |
Plinth level |
-
latitude : 22.8985487,22.8985487
Longitude : 88.3784555,88.3784555
file name : Image_02012024152825827.png
|
2024-01-02 15:28:26.078233 |
302 |
72341915 |
Construction of roads |
129425 |
Construction of roads1 |
Completion of work |
-
latitude : 22.8985853,22.8985853,22.8985853
Longitude : 88.3803344,88.3803344,88.3803344
file name : Image_13122023130252630.png
|
2023-12-13 13:02:52.718427 |
303 |
87957999 |
Creation of Small-bore pipe conveyance system |
101415 |
Creation of Small-bore pipe conveyance system1 |
Roof laid |
-
latitude : 22.9092957
Longitude : 88.3702178
file name : Image_29022024174712702.png
|
2024-02-29 17:47:12.805626 |
304 |
87957999 |
Creation of Small-bore pipe conveyance system |
101415 |
Creation of Small-bore pipe conveyance system1 |
Plinth level |
-
latitude : 22.910225
Longitude : 88.36876166666667
file name : Image_26022024161316971.png
|
2024-02-26 16:13:17.179918 |
305 |
87957999 |
Creation of Small-bore pipe conveyance system |
101415 |
Creation of Small-bore pipe conveyance system1 |
Completion of work |
-
latitude : 22.9096741
Longitude : 88.3708245
file name : Image_20022024153827865.png
|
2024-02-20 15:38:27.962093 |
306 |
72333931 |
Construction of roads |
64437 |
Construction of roads1 |
Roof laid |
-
latitude : 22.906554,22.9065041
Longitude : 88.3826298,88.3826243
file name : Image_02012024122517793.png
|
2024-01-02 12:25:17.890969 |
307 |
72333931 |
Construction of roads |
64437 |
Construction of roads1 |
Plinth level |
-
latitude : 22.9067065,22.9067065
Longitude : 88.3826424,88.3826424
file name : Image_28122023193307743.png
|
2023-12-28 19:33:07.863115 |
308 |
72333931 |
Construction of roads |
64437 |
Construction of roads1 |
Completion of work |
-
latitude : 22.9063551,22.9063551,22.9063551
Longitude : 88.3825845,88.3825845,88.3825845
file name : Image_26122023135221299.png
|
2023-12-26 13:52:21.388834 |
309 |
72333931 |
Construction of roads |
64437 |
Construction of roads1 |
Completion of work |
-
latitude : 22.9066217,22.9066217
Longitude : 88.3825657,88.3825657
file name : Image_20122023132519668.png
|
2023-12-20 13:25:19.762223 |
310 |
72345338 |
Construction of roads |
86303 |
Construction of roads1 |
Roof laid |
-
latitude : 22.902414999999998,22.902414999999998
Longitude : 88.37694000000002,88.37694000000002
file name : Image_15012024160423765.png
|
2024-01-15 16:04:23.864609 |
311 |
72345338 |
Construction of roads |
86303 |
Construction of roads1 |
Plinth level |
-
latitude : 22.90251333333333,22.902504999999998
Longitude : 88.37682833333335,88.37683666666665
file name : Image_08012024132224190.png
|
2024-01-08 13:22:24.316376 |
312 |
72345338 |
Construction of roads |
86303 |
Construction of roads1 |
Completion of work |
-
latitude : 22.902433333333338,22.902431666666665
Longitude : 88.37691500000001,88.37691000000001
file name : Image_26122023144454061.png
|
2023-12-26 14:44:54.144669 |
313 |
72164008 |
Drainage Construction |
211556 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.903623333333332
Longitude : 88.380955
file name : Image_04012024155120679.png
|
2024-01-04 15:51:20.765892 |
314 |
72164008 |
Drainage Construction |
211556 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.8983884
Longitude : 88.3827362
file name : Image_26122023142204849.png
|
2023-12-26 14:22:04.941914 |
315 |
72164008 |
Drainage Construction |
211556 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.903384
Longitude : 88.3811155
file name : Image_18122023153419725.png
|
2023-12-18 15:34:19.809464 |
316 |
72154094 |
Drainage Construction |
213742 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.90118166666667
Longitude : 88.37970833333333
file name : Image_12022024155304402.png
|
2024-02-12 15:53:04.48166 |
317 |
72154094 |
Drainage Construction |
213742 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.900501666666667
Longitude : 88.37944666666665
file name : Image_07022024151525541.png
|
2024-02-07 15:15:25.660616 |
318 |
72154094 |
Drainage Construction |
213742 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.900533333333335
Longitude : 88.37941666666666
file name : Image_15012024155604653.png
|
2024-01-15 15:56:04.734807 |
319 |
72167040 |
Drainage Construction |
183894 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.8985487
Longitude : 88.3784555
file name : Image_04012024152923558.png
|
2024-01-04 15:29:23.644901 |
320 |
72167040 |
Drainage Construction |
183894 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.8983884
Longitude : 88.3827362
file name : Image_26122023140944149.png
|
2023-12-26 14:09:44.241337 |
321 |
72167040 |
Drainage Construction |
183894 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.903329999999997
Longitude : 88.37599333333334
file name : Image_18122023153304730.png
|
2023-12-18 15:33:04.815695 |
322 |
87957572 |
Creation of Shed for segregation and processing of wet and dry waste |
1341720 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 22.91022666666667
Longitude : 88.36888333333333
file name : Image_05032024155730508.png
|
2024-03-05 15:57:30.613988 |
323 |
87957572 |
Creation of Shed for segregation and processing of wet and dry waste |
1341720 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 22.910146666666666
Longitude : 88.36881999999999
file name : Image_04032024155721562.png
|
2024-03-04 15:57:21.653124 |
324 |
87959146 |
Purchase of segregation bins to be fixed at public places |
492560 |
Purchase of segregation bins to be fixed at public places1 |
Roof laid |
-
latitude : 22.9089991
Longitude : 88.3819168
file name : Image_10062024141102416.png
|
2024-06-10 14:11:02.530384 |
325 |
87959146 |
Purchase of segregation bins to be fixed at public places |
492560 |
Purchase of segregation bins to be fixed at public places1 |
Plinth level |
-
latitude : 22.908997
Longitude : 88.3819231
file name : Image_07062024173526018.png
|
2024-06-07 17:35:26.125971 |
326 |
87959146 |
Purchase of segregation bins to be fixed at public places |
492560 |
Purchase of segregation bins to be fixed at public places1 |
Completion of work |
-
latitude : 22.908823
Longitude : 88.3819415
file name : Image_12032024173922759.png
|
2024-03-12 17:39:22.869575 |
327 |
106508816 |
Construction of roads |
84006 |
Construction of roads1 |
Plinth level |
-
latitude : 22.914978333333337,22.914822
Longitude : 88.38180333333334,88.3819443
file name : Image_22072024181130597.png
|
2024-07-22 18:11:30.680053 |
328 |
106508816 |
Construction of roads |
84006 |
Construction of roads1 |
Completion of work |
-
latitude : 22.9130071,22.9130071
Longitude : 88.3810187,88.3810187
file name : Image_12072024130109467.png
|
2024-07-12 13:01:09.602737 |
329 |
106508848 |
Construction of roads |
312182 |
Construction of roads1 |
Plinth level |
-
latitude : 22.904821666666667,22.904823333333336
Longitude : 88.3753,88.37529666666666
file name : Image_21062024171554714.png
|
2024-06-21 17:15:54.810429 |
330 |
106508848 |
Construction of roads |
312182 |
Construction of roads1 |
Plinth level |
-
latitude : 22.904821666666667,22.904823333333336
Longitude : 88.3753,88.37529666666666
file name : Image_21062024163923299.png
|
2024-06-21 16:39:23.386482 |
331 |
106508848 |
Construction of roads |
312182 |
Construction of roads1 |
Completion of work |
-
latitude : 22.901133333333338,22.901133333333338
Longitude : 88.37991166666667,88.37991166666667
file name : Image_18062024163909291.png
|
2024-06-18 16:39:09.383702 |
332 |
106508993 |
Drainage Construction |
347878 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.905604999999998
Longitude : 88.37836166666666
file name : Image_21062024163912241.png
|
2024-06-21 16:39:12.325186 |
333 |
106508993 |
Drainage Construction |
347878 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.91499666666667
Longitude : 88.38185333333334
file name : Image_17062024180107287.png
|
2024-06-17 18:01:07.38685 |
334 |
106508993 |
Drainage Construction |
347878 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.905739999999998
Longitude : 88.37843999999998
file name : Image_14062024174653484.png
|
2024-06-14 17:46:53.567658 |
335 |
106509026 |
Drainage Construction |
229959 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.9012394
Longitude : 88.3807178
file name : Image_17062024180731238.png
|
2024-06-17 18:07:31.337033 |
336 |
106509026 |
Drainage Construction |
229959 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.9090019
Longitude : 88.3819425
file name : Image_15062024181605248.png
|
2024-06-15 18:16:05.345248 |
337 |
106509026 |
Drainage Construction |
229959 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.9090019
Longitude : 88.3819425
file name : Image_15062024181347619.png
|
2024-06-15 18:13:47.71004 |
338 |
106509026 |
Drainage Construction |
229959 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.9016283
Longitude : 88.3807
file name : Image_14062024160731172.png
|
2024-06-14 16:07:31.27353 |
339 |
106508926 |
Construction of roads |
144285 |
Construction of roads1 |
Plinth level |
-
latitude : 22.9009249,22.9009249
Longitude : 88.3801159,88.3801159
file name : Image_21062024163915675.png
|
2024-06-21 16:39:15.755405 |
340 |
106508926 |
Construction of roads |
144285 |
Construction of roads1 |
Plinth level |
-
latitude : 22.9009434,22.9009434
Longitude : 88.3802545,88.3802545
file name : Image_21062024160908109.png
|
2024-06-21 16:09:08.192724 |
341 |
106508926 |
Construction of roads |
144285 |
Construction of roads1 |
Completion of work |
-
latitude : 22.900901666666662,22.900901666666662
Longitude : 88.38055333333332,88.38055333333332
file name : Image_18062024155913484.png
|
2024-06-18 15:59:13.564679 |
342 |
106508886 |
Construction of roads |
237631 |
Construction of roads1 |
Plinth level |
-
latitude : 22.9120385,22.9120385
Longitude : 88.3542517,88.3542517
file name : Image_26062024170101642.png
|
2024-06-26 17:01:01.738767 |
343 |
106508886 |
Construction of roads |
237631 |
Construction of roads1 |
Completion of work |
-
latitude : 22.91272333333333,22.91272333333333
Longitude : 88.35456166666667,88.35456166666667
file name : Image_21062024171600257.png
|
2024-06-21 17:16:00.354808 |
344 |
106508870 |
Construction of roads |
348556 |
Construction of roads1 |
Plinth level |
-
latitude : 22.9083955,22.9083955
Longitude : 88.36997,88.36997
file name : Image_13072024152702378.png
|
2024-07-13 15:27:01.645537 |
345 |
106508870 |
Construction of roads |
348556 |
Construction of roads1 |
Completion of work |
-
latitude : 22.908801666666665,22.908795
Longitude : 88.370035,88.37003000000001
file name : Image_18062024165031908.png
|
2024-06-18 16:50:31.999719 |
346 |
106508832 |
Construction of roads |
248071 |
Construction of roads1 |
Plinth level |
-
latitude : 22.9047711,22.9047711
Longitude : 88.3531736,88.3531736
file name : Image_26062024165132122.png
|
2024-06-26 16:51:32.203791 |
347 |
106508832 |
Construction of roads |
248071 |
Construction of roads1 |
Completion of work |
-
latitude : 22.9046737,22.9046737
Longitude : 88.3531477,88.3531477
file name : Image_15062024181631564.png
|
2024-06-15 18:16:31.659504 |
348 |
106508943 |
Construction of roads |
61908 |
Construction of roads1 |
Plinth level |
-
latitude : 22.9011143,22.9011143
Longitude : 88.3803451,88.3803451
file name : Image_21062024163919670.png
|
2024-06-21 16:39:19.766079 |
349 |
106508943 |
Construction of roads |
61908 |
Construction of roads1 |
Completion of work |
-
latitude : 22.901069999999997,22.9009695
Longitude : 88.38012833333332,88.3804016
file name : Image_18062024160546232.png
|
2024-06-18 16:05:46.316693 |
350 |
72101389 |
Drinking water facility |
349467 |
Drinking water facility1 |
Plinth level |
-
latitude : 22.9089965
Longitude : 88.3818818
file name : Image_19092024121403175.png
|
2024-09-19 12:14:03.249625 |
351 |
72101389 |
Drinking water facility |
349467 |
Drinking water facility1 |
Completion of work |
-
latitude : 22.9090036
Longitude : 88.3818781
file name : Image_18092024154454231.png
|
2024-09-18 15:44:54.308548 |
352 |
106508906 |
Construction of roads |
214601 |
Construction of roads1 |
Plinth level |
-
latitude : 22.910981666666665,22.9110044
Longitude : 88.37369833333332,88.3740692
file name : Image_20092024173256083.png
|
2024-09-20 17:32:56.160095 |
353 |
106508906 |
Construction of roads |
214601 |
Construction of roads1 |
Completion of work |
-
latitude : 22.9109339,22.9109339
Longitude : 88.3740327,88.3740327
file name : Image_19092024142445396.png
|
2024-09-19 14:24:45.485255 |
354 |
72362246 |
Construction of roads |
348761 |
Construction of roads1 |
Roof laid |
-
latitude : 22.912147,22.912147
Longitude : 88.3631798,88.3631798
file name : Image_26122023152954604.png
|
2023-12-26 15:29:54.758071 |
355 |
72362246 |
Construction of roads |
348761 |
Construction of roads1 |
Plinth level |
-
latitude : 22.901605000000004,22.901621666666664
Longitude : 88.35857333333334,88.35856833333334
file name : Image_20122023163736620.png
|
2023-12-20 16:37:36.716369 |
356 |
72362246 |
Construction of roads |
348761 |
Construction of roads1 |
Completion of work |
-
latitude : 22.901563333333335,22.901563333333335
Longitude : 88.35853166666666,88.35853166666666
file name : Image_13122023161125297.png
|
2023-12-13 16:11:25.390856 |
357 |
72148144 |
Drainage Construction |
238814 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.9086499
Longitude : 88.3818748
file name : Image_05082024184144880.png
|
2024-08-05 18:41:44.978956 |
358 |
72148144 |
Drainage Construction |
238814 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.9086025
Longitude : 88.3818894
file name : Image_29072024160608667.png
|
2024-07-29 16:06:08.743978 |
359 |
72342984 |
Construction of roads |
129618 |
Construction of roads1 |
Roof laid |
-
latitude : 22.8981956,22.8981956
Longitude : 88.3791501,88.3791501
file name : Image_15012024154903833.png
|
2024-01-15 15:49:03.926063 |
360 |
72342984 |
Construction of roads |
129618 |
Construction of roads1 |
Plinth level |
-
latitude : 22.8984158,22.8984158
Longitude : 88.3793265,88.3793265
file name : Image_18122023145650979.png
|
2023-12-18 14:56:51.35349 |
361 |
72342984 |
Construction of roads |
129618 |
Construction of roads1 |
Completion of work |
-
latitude : 22.909128333333335,22.8985175
Longitude : 88.38183666666667,88.3790043
file name : Image_13122023125959870.png
|
2023-12-13 12:59:59.988147 |