1 |
34846460 |
Improvement of road by concreting from Golam Mostafa to Kanrar para |
1450526 |
Improvement of road by concreting from Golam Mostafa to Kanrar para1 |
Roof laid |
-
latitude : 22.713330499827862,22.713330499827862
Longitude : 87.93427107855678,87.93427107855678
file name : Image_01032021191503731.png
|
2021-03-01 19:15:03.842579 |
2 |
34846460 |
Improvement of road by concreting from Golam Mostafa to Kanrar para |
1450526 |
Improvement of road by concreting from Golam Mostafa to Kanrar para1 |
Completion of work |
-
latitude : 22.71329843904823,22.713290601968765
Longitude : 87.93426671996713,87.93432413600385
file name : Image_02022021154002069.png
|
2021-02-02 15:40:02.172545 |
3 |
34846460 |
Improvement of road by concreting from Golam Mostafa to Kanrar para |
1450526 |
Improvement of road by concreting from Golam Mostafa to Kanrar para1 |
Plinth level |
-
latitude : 22.713295337744057,22.713295337744057,22.713295337744057,22.713295337744057,22.713295337744057,22.71330967079848
Longitude : 87.93432296253741,87.93432296253741,87.93432296253741,87.93432296253741,87.93432296253741,87.93423553928733
file name : Image_09022021144322127.png
|
2021-02-09 14:43:22.23685 |
4 |
34802625 |
Construction of Swasan Chulli at Bandaipur Swasan |
349926 |
Construction of Swasan Chulli at Bandaipur Swasan1 |
Completion of work |
-
latitude : 22.718402054160833
Longitude : 87.93472118675709
file name : Image_24022021160442219.png
|
2021-02-24 16:04:42.288711 |
5 |
34855255 |
Improvement of road by concreting from house of Abani Dolui to PMGSY road |
349383 |
Improvement of road by concreting from house of Abani Dolui to PMGSY road1 |
Completion of work |
-
latitude : 22.701018573716283,22.70150757394731
Longitude : 87.90486761368811,87.90288663469255
file name : Image_26022021122234466.png
|
2021-02-26 12:22:34.559376 |
6 |
34848606 |
Improvement of road by concreting from Pitch rasta to Dilip Jomjar House |
147850 |
Improvement of road by concreting from Pitch rasta to Dilip Jomjar House1 |
Completion of work |
-
latitude : 22.69563642796129,22.6949269
Longitude : 87.92317846789956,87.9238279
file name : Image_26022021154804763.png
|
2021-02-26 15:48:04.876976 |
7 |
34844819 |
Construction of Cnocrete Road from house of Kartick Maity to House of Sujit Maity |
304386 |
Construction of Cnocrete Road from house of Kartick Maity to House of Sujit Maity1 |
Completion of work |
-
latitude : 22.718876134604216,22.71888669580221,22.718820814043283
Longitude : 87.9196865670383,87.91966427117586,87.91962512768805
file name : Image_18022021175500053.png
|
2021-02-18 17:55:00.167479 |
8 |
34844819 |
Construction of Cnocrete Road from house of Kartick Maity to House of Sujit Maity |
304386 |
Construction of Cnocrete Road from house of Kartick Maity to House of Sujit Maity1 |
Plinth level |
-
latitude : 22.718732887879014,22.718737120740116
Longitude : 87.91961783543229,87.9196067713201
file name : Image_01032021191517831.png
|
2021-03-01 19:15:17.912281 |
9 |
34844819 |
Construction of Cnocrete Road from house of Kartick Maity to House of Sujit Maity |
304386 |
Construction of Cnocrete Road from house of Kartick Maity to House of Sujit Maity1 |
Roof laid |
-
latitude : 22.718896460719407,22.718786112964153
Longitude : 87.9196384549141,87.91963526979089
file name : Image_04032021145905332.png
|
2021-03-04 14:59:05.431427 |
10 |
34854311 |
Improvement of road by concreting from house Bag to house of Bharat Khan |
330128 |
Improvement of road by concreting from house Bag to house of Bharat Khan1 |
Completion of work |
-
latitude : 22.712537990882993,22.712537948973477
Longitude : 87.90775643661618,87.90775668807328
file name : Image_26022021154743577.png
|
2021-02-26 15:47:43.717454 |
11 |
34856658 |
Construction of Swasan Chulli of Kabilpur Burning Ghat |
349926 |
Construction of Swasan Chulli of Kabilpur Burning Ghat1 |
Completion of work |
-
latitude : 22.69870139658451
Longitude : 87.89176569320261
file name : Image_26022021115804240.png
|
2021-02-26 11:58:04.362675 |
12 |
34856658 |
Construction of Swasan Chulli of Kabilpur Burning Ghat |
349926 |
Construction of Swasan Chulli of Kabilpur Burning Ghat1 |
Completion of work |
-
latitude : 22.69874875433743
Longitude : 87.89165874011815
file name : Image_26022021115843668.png
|
2021-02-26 11:58:43.795523 |
13 |
34847047 |
Improvement of road by concreting from Karati Para to Mantu Das House |
174856 |
Improvement of road by concreting from Karati Para to Mantu Das House1 |
Completion of work |
-
latitude : 22.700912123546004,22.700935089960694
Longitude : 87.93435540050268,87.9343424923718
file name : Image_24022021160446008.png
|
2021-02-24 16:04:45.887488 |
14 |
34847047 |
Improvement of road by concreting from Karati Para to Mantu Das House |
174856 |
Improvement of road by concreting from Karati Para to Mantu Das House1 |
Completion of work |
-
latitude : 22.701580286957324,22.701580286957324,22.70158162806183
Longitude : 87.93444064445794,87.93444064445794,87.93445196002722
file name : Image_24022021164204708.png
|
2021-02-24 16:42:04.809729 |
15 |
34800299 |
Construction of Swasan Chulli at Bag Para Swasan |
349926 |
Construction of Swasan Chulli at Bag Para Swasan1 |
Completion of work |
-
latitude : 22.72435136139393
Longitude : 87.93088227510452
file name : Image_01032021191511095.png
|
2021-03-01 19:15:11.219042 |
16 |
34802173 |
Swasan Chulli at Bandaipur Paschim Para Swasan |
349926 |
Swasan Chulli at Bandaipur Paschim Para Swasan1 |
Completion of work |
-
latitude : 22.71249419543892
Longitude : 87.93822138570249
file name : Image_24022021162055024.png
|
2021-02-24 16:20:55.147176 |
17 |
34848528 |
Improvement of road by concreting from Gopinath Majo goal Ghar to Maji Pond |
147850 |
Improvement of road by concreting from Gopinath Majo goal Ghar to Maji Pond1 |
Completion of work |
-
latitude : 22.6949269,22.696388871409
Longitude : 87.9238279,87.92649149894714
file name : Image_01032021191456469.png
|
2021-03-01 19:14:56.557747 |
18 |
34854035 |
Improvement of road by concreting from New ICDS centre to Ranir Bari |
2273695 |
Improvement of road by concreting from New ICDS centre to Ranir Bari1 |
Plinth level |
-
latitude : 22.709099985659122,22.70908867008984
Longitude : 87.92173015885055,87.92173300869763
file name : Image_15022021154438824.png
|
2021-02-15 15:44:38.928887 |
19 |
34854035 |
Improvement of road by concreting from New ICDS centre to Ranir Bari |
2273695 |
Improvement of road by concreting from New ICDS centre to Ranir Bari1 |
Completion of work |
-
latitude : 22.70897689741105,22.709004264324903
Longitude : 87.92168724350631,87.92170710861683
file name : Image_09022021163229598.png
|
2021-02-09 16:32:29.689855 |
20 |
34854035 |
Improvement of road by concreting from New ICDS centre to Ranir Bari |
2273695 |
Improvement of road by concreting from New ICDS centre to Ranir Bari1 |
Completion of work |
-
latitude : 22.70894492045045,22.709313430823386
Longitude : 87.92167458683252,87.9217807855457
file name : Image_29012021161320394.png
|
2021-01-29 16:13:20.487185 |
21 |
34850308 |
Improvement of road by concreting from Gandhi Das to house of Dudhkumar Mondal |
1398674 |
Improvement of road by concreting from Gandhi Das to house of Dudhkumar Mondal1 |
Completion of work |
-
latitude : 22.692705360241234,22.69255901221186,22.692542835138738
Longitude : 87.92386167682707,87.92386637069285,87.92385455220938
file name : Image_15022021152601837.png
|
2021-02-15 15:26:01.933711 |
22 |
34850308 |
Improvement of road by concreting from Gandhi Das to house of Dudhkumar Mondal |
1398674 |
Improvement of road by concreting from Gandhi Das to house of Dudhkumar Mondal1 |
Plinth level |
-
latitude : 22.69246551208198,22.6923955231905
Longitude : 87.923803338781,87.92376981116831
file name : Image_04032021153401621.png
|
2021-03-04 15:34:01.722033 |
23 |
34853896 |
Construction of Bamboo Bridge at Soneyr Kheye Ghat |
50250 |
Construction of Bamboo Bridge at Soneyr Kheye Ghat1 |
Completion of work |
-
latitude : 22.72337864153087
Longitude : 87.91765789501369
file name : Image_22072021122450061.png
|
2021-07-22 12:24:50.162647 |
24 |
34850219 |
Improvement of road by concreting from shop of Ajit Maji to house of Uttam Koley |
209229 |
Improvement of road by concreting from shop of Ajit Maji to house of Uttam Koley1 |
Completion of work |
-
latitude : 22.694748071953654,22.694748071953654,22.694631940685213
Longitude : 87.9251691699028,87.9251691699028,87.92506271973252
file name : Image_15062021150455327.png
|
2021-06-15 15:04:55.415717 |
25 |
34850219 |
Improvement of road by concreting from shop of Ajit Maji to house of Uttam Koley |
209229 |
Improvement of road by concreting from shop of Ajit Maji to house of Uttam Koley1 |
Plinth level |
-
latitude : 22.694748742505908,22.694655284285545
Longitude : 87.92513539083302,87.925063977018
file name : Image_23062021174224208.png
|
2021-06-23 17:42:24.30415 |
26 |
34849919 |
Improvement of road by concreting from Buddhadeb Bera to Nemai Pandit |
254606 |
Improvement of road by concreting from Buddhadeb Bera to Nemai Pandit 1 |
Completion of work |
-
latitude : 22.6947981,22.69526096060872,22.6948046,22.6948046
Longitude : 87.926655,87.92693104594946,87.9266502,87.9266502
file name : Image_15062021150452368.png
|
2021-06-15 15:04:52.455885 |
27 |
34849919 |
Improvement of road by concreting from Buddhadeb Bera to Nemai Pandit |
254606 |
Improvement of road by concreting from Buddhadeb Bera to Nemai Pandit 1 |
Plinth level |
-
latitude : 22.695356304757297,22.6948071,22.694806,22.695225505158305
Longitude : 87.92688217945397,87.9266534,87.9266614,87.92689592577517
file name : Image_23062021174551414.png
|
2021-06-23 17:45:51.516954 |
28 |
34869016 |
Improvement of road by concreting from house of Haru Kheto to Samanta Para |
1426238 |
Improvement of road by concreting from house of Haru Kheto to Samanta Para1 |
Completion of work |
-
latitude : 22.69520836416632,22.693601846694946
Longitude : 87.90431113913655,87.90772869251668
file name : Image_26022021154755164.png
|
2021-02-26 15:47:55.27209 |
29 |
34869016 |
Improvement of road by concreting from house of Haru Kheto to Samanta Para |
1426238 |
Improvement of road by concreting from house of Haru Kheto to Samanta Para1 |
Completion of work |
-
latitude : 22.693798234686255,22.693798067048192
Longitude : 87.90742040611804,87.90742040611804
file name : Image_22062021183136406.png
|
2021-06-22 18:31:36.5262 |
30 |
34869016 |
Improvement of road by concreting from house of Haru Kheto to Samanta Para |
1426238 |
Improvement of road by concreting from house of Haru Kheto to Samanta Para1 |
Completion of work |
-
latitude : 22.693802467547357,22.69391432404518
Longitude : 87.90742660872638,87.90732493624091
file name : Image_22062021183735656.png
|
2021-06-22 18:37:35.736889 |
31 |
34872925 |
Sinking of 27 nos new Tubewell at different places under Arunda GP |
1125250 |
Sinking of 27 nos new Tubewell at different places under Arunda GP1 |
Completion of work |
-
latitude : 22.696895012632012
Longitude : 87.9231730196625
file name : Image_22112021155247379.png
|
2021-11-22 15:52:47.496128 |
32 |
34872925 |
Sinking of 27 nos new Tubewell at different places under Arunda GP |
1125250 |
Sinking of 27 nos new Tubewell at different places under Arunda GP1 |
Plinth level |
-
latitude : 22.696907208301127
Longitude : 87.92312080040574
file name : Image_24112021175653159.png
|
2021-11-24 17:56:53.28207 |
33 |
49196906 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT LAWSAR BAGAN PARA |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT LAWSAR BAGAN PARA1 |
Completion of work |
-
latitude : 22.7039128029719
Longitude : 87.87724496796727
file name : Image_13122021172320279.png
|
2021-12-13 17:23:20.376662 |
34 |
49196906 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT LAWSAR BAGAN PARA |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT LAWSAR BAGAN PARA1 |
Plinth level |
-
latitude : 22.703889166004956
Longitude : 87.87720163352787
file name : Image_17012022135510831.png
|
2022-01-17 13:55:10.960893 |
35 |
49196906 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT LAWSAR BAGAN PARA |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT LAWSAR BAGAN PARA1 |
Plinth level |
-
latitude : 22.70388124510646
Longitude : 87.87722434848547
file name : Image_17012022135514663.png
|
2022-01-17 13:55:14.788733 |
36 |
34857184 |
Repairing of 35 nos tube well |
2032356 |
Repairing of 35 nos tube well1 |
Completion of work |
-
latitude : 22.718423721380532
Longitude : 87.92263741604984
file name : Image_24022022124107258.png
|
2022-02-24 12:41:07.38573 |
37 |
34857184 |
Repairing of 35 nos tube well |
2032356 |
Repairing of 35 nos tube well2 |
Completion of work |
-
latitude : 22.717511225491762
Longitude : 87.93457148596644
file name : Image_24022022124110741.png
|
2022-02-24 12:41:10.851222 |
38 |
34857184 |
Repairing of 35 nos tube well |
2032356 |
Repairing of 35 nos tube well14 |
Completion of work |
-
latitude : 22.716647051274776
Longitude : 87.93635289184749
file name : Image_24022022124114079.png
|
2022-02-24 12:41:14.196315 |
39 |
49214404 |
SINKING OF NEW MINI WITH SOLAR SYSTEM NEAR HAMBIR PARA ASUTHTOLA |
349197 |
SINKING OF NEW MINI WITH SOLAR SYSTEM NEAR HAMBIR PARA ASUTHTOLA1 |
Completion of work |
-
latitude : 22.725595822557807
Longitude : 87.92786017991602
file name : Image_19012022155316507.png
|
2022-01-19 15:53:16.64039 |
40 |
49196964 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR DOLUI PARA |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR DOLUI PARA1 |
Completion of work |
-
latitude : 22.696258574724197
Longitude : 87.92668076232076
file name : Image_19012022152758091.png
|
2022-01-19 15:27:58.210537 |
41 |
49197027 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR PAR CHABBISHPUR SANTRA PARA |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR PAR CHABBISHPUR SANTRA PARA1 |
Completion of work |
-
latitude : 22.710679178126156
Longitude : 87.92261403053999
file name : Image_27012022165510138.png
|
2022-01-27 16:55:10.305428 |
42 |
58148607 |
SOAK PIT WITH REPAIRING ALL TUBEWELL UNDER ARUNDA GP |
2519510 |
SOAK PIT WITH REPAIRING ALL TUBEWELL UNDER ARUNDA GP1 |
Completion of work |
-
latitude : 22.696934449486434
Longitude : 87.92314879596233
file name : Image_20072022150002278.png
|
2022-07-20 15:00:02.415851 |
43 |
58147064 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR MAITY PARA |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR MAITY PARA1 |
Completion of work |
-
latitude : 22.707202951423824
Longitude : 87.88603850640357
file name : Image_17102022114456106.png
|
2022-10-17 11:44:56.228222 |
44 |
58147064 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR MAITY PARA |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR MAITY PARA1 |
Plinth level |
-
latitude : 22.70722189452499
Longitude : 87.88607379421592
file name : Image_05012023132102696.png
|
2023-01-05 13:21:02.788631 |
45 |
58147598 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT ARUNDA BAG PARA |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT ARUNDA BAG PARA1 |
Completion of work |
-
latitude : 22.72436297032982
Longitude : 87.93085025623441
file name : Image_15102022131317902.png
|
2022-10-15 13:13:18.00016 |
46 |
58147598 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT ARUNDA BAG PARA |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT ARUNDA BAG PARA1 |
Plinth level |
-
latitude : 22.724394109100103
Longitude : 87.93078462593257
file name : Image_29102022113145163.png
|
2022-10-29 11:31:45.303945 |
47 |
58146926 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR ARUNDA PRY SCHOOL |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR ARUNDA PRY SCHOOL1 |
Completion of work |
-
latitude : 22.721936535090208
Longitude : 87.91983811184764
file name : Image_15102022131311791.png
|
2022-10-15 13:13:11.875603 |
48 |
58146926 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR ARUNDA PRY SCHOOL |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR ARUNDA PRY SCHOOL1 |
Plinth level |
-
latitude : 22.721933056600392
Longitude : 87.91980952955782
file name : Image_29102022111854307.png
|
2022-10-29 11:18:54.440063 |
49 |
57958397 |
CONSTRUCTION OF CONCRETE ROAD FROM SWAPAN BHANGI HOUSE TO DAL PARA |
946460 |
CONSTRUCTION OF CONCRETE ROAD FROM SWAPAN BHANGI HOUSE TO DAL PARA1 |
Completion of work |
-
latitude : 22.701952275820076,22.701923442073166
Longitude : 87.87622849456966,87.8762750979513
file name : Image_01092022180734079.png
|
2022-09-01 18:07:34.17626 |
50 |
75935198 |
CONSTRUCTION OF SWASAN CHULLI AT JASHU PARA SWASAN AT DHARASHIMUL UNDER ARUNDA GP |
409453 |
CONSTRUCTION OF SWASAN CHULLI AT JASHU PARA SWASAN AT DHARASHIMUL UNDER ARUNDA GP1 |
Completion of work |
-
latitude : 22.71204245276749
Longitude : 87.93560388498008
file name : Image_19052023095555649.png
|
2023-05-19 09:55:55.770241 |
51 |
75935198 |
CONSTRUCTION OF SWASAN CHULLI AT JASHU PARA SWASAN AT DHARASHIMUL UNDER ARUNDA GP |
409453 |
CONSTRUCTION OF SWASAN CHULLI AT JASHU PARA SWASAN AT DHARASHIMUL UNDER ARUNDA GP1 |
Completion of work |
-
latitude : 22.7199962
Longitude : 87.925996
file name : Image_16102023160405280.png
|
2023-10-16 16:04:05.36035 |
52 |
58147310 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR SCHOOL MATH |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR SCHOOL MATH1 |
Completion of work |
-
latitude : 22.725594313815236
Longitude : 87.92769480496645
file name : Image_05012023142725725.png
|
2023-01-05 14:27:25.825172 |
53 |
58147310 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR SCHOOL MATH |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR SCHOOL MATH1 |
Plinth level |
-
latitude : 22.725656172260642
Longitude : 87.9277995787561
file name : Image_05012023144427306.png
|
2023-01-05 14:44:27.427902 |
54 |
34844874 |
Construction of Cnocrete Road from house of Subrata Khamrui to house of Shibu Jana |
349225 |
Construction of Cnocrete Road from house of Subrata Khamrui to house of Shibu Jana1 |
Completion of work |
-
latitude : 22.719614035449922,22.71963549312204
Longitude : 87.92032987810671,87.92043331079185
file name : Image_11062021113514181.png
|
2021-06-11 11:35:14.29171 |
55 |
34844874 |
Construction of Cnocrete Road from house of Subrata Khamrui to house of Shibu Jana |
349225 |
Construction of Cnocrete Road from house of Subrata Khamrui to house of Shibu Jana1 |
Completion of work |
-
latitude : 22.7196047315374,22.719598906114697
Longitude : 87.92047882452607,87.9204064887017
file name : Image_14062021175222411.png
|
2021-06-14 17:52:22.500284 |
56 |
34850033 |
Improvement of road by concreting from shop of Tinkar Polley to house of Yadav Polley |
181521 |
Improvement of road by concreting from shop of Tinkar Polley to house of Yadav Polley1 |
Completion of work |
-
latitude : 22.694314350374043,22.69417122937739
Longitude : 87.92360787279904,87.92382496409118
file name : Image_25032021155914666.png
|
2021-03-25 15:59:14.780855 |
57 |
34850033 |
Improvement of road by concreting from shop of Tinkar Polley to house of Yadav Polley |
181521 |
Improvement of road by concreting from shop of Tinkar Polley to house of Yadav Polley1 |
Plinth level |
-
latitude : 22.694327384233475,22.694327384233475
Longitude : 87.92362648062408,87.92362648062408
file name : Image_24082021153705155.png
|
2021-08-24 15:37:05.258383 |
58 |
67693729 |
Construction of Sheds |
368542 |
Construction of Sheds1 |
Completion of work |
-
latitude : 22.713973333333335
Longitude : 87.92544166666667
file name : Image_29082024132913996.png
|
2024-08-29 13:29:14.454089 |
59 |
34868375 |
Improvement of road by concreting from house of Paritosh Pandit to house of Raju Santra |
711720 |
Improvement of road by concreting from house of Paritosh Pandit to house of Raju Santra1 |
Plinth level |
-
latitude : 22.710405802354217,22.710405802354217
Longitude : 87.89584508165717,87.89584508165717
file name : Image_01032023120201584.png
|
2023-03-01 12:02:01.707191 |
60 |
67460489 |
Drinking water facilities |
246616 |
Drinking water facilities1 |
Plinth level |
-
latitude : 22.70152
Longitude : 87.87600666666667
file name : Image_12092024134007151.png
|
2024-09-12 13:40:07.239753 |
61 |
67460489 |
Drinking water facilities |
246616 |
Drinking water facilities1 |
Completion of work |
-
latitude : 22.701551666666667
Longitude : 87.87601833333335
file name : Image_06092024143408735.png
|
2024-09-06 14:34:08.83317 |
62 |
67493259 |
Construction Toilet |
856706 |
Construction Toilet1 |
Completion of work |
-
latitude : 22.698888333333336
Longitude : 87.89201999999999
file name : Image_06092024153549494.png
|
2024-09-06 15:35:49.610408 |
63 |
67198308 |
Water Supply to villages |
349197 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.702799518592656
Longitude : 87.92122213169932
file name : Image_31032023132006914.png
|
2023-03-31 13:20:07.083795 |
64 |
67198220 |
Construction of toilets in public institutions |
854640 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 22.691906564868987
Longitude : 87.92182613164186
file name : Image_31032023131948857.png
|
2023-03-31 13:19:49.021294 |
65 |
67198220 |
Construction of toilets in public institutions |
854640 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 22.691906564868987
Longitude : 87.92182613164186
file name : Image_31032023132020392.png
|
2023-03-31 13:20:20.496116 |
66 |
67198220 |
Construction of toilets in public institutions |
854640 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 22.688250755891204
Longitude : 87.92151189409196
file name : Image_31032023132144369.png
|
2023-03-31 13:21:44.741948 |
67 |
49196991 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR GOBERIYA AGUNKHAKI POND |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR GOBERIYA AGUNKHAKI POND1 |
Completion of work |
-
latitude : 22.72778509184718
Longitude : 87.93288663960993
file name : Image_30102021101141878.png
|
2021-10-30 10:11:41.973558 |
68 |
49196991 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR GOBERIYA AGUNKHAKI POND |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR GOBERIYA AGUNKHAKI POND1 |
Plinth level |
-
latitude : 22.72781597916037
Longitude : 87.93290650472045
file name : Image_02112021142753058.png
|
2021-11-02 14:27:53.169735 |
69 |
49196838 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT DHARASHIMUL JASHU PARA |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT DHARASHIMUL JASHU PARA1 |
Plinth level |
-
latitude : 22.7117156
Longitude : 87.9342898
file name : Image_02112021143937828.png
|
2021-11-02 14:39:37.924201 |
70 |
49196838 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT DHARASHIMUL JASHU PARA |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT DHARASHIMUL JASHU PARA1 |
Completion of work |
-
latitude : 22.7117151
Longitude : 87.9342898
file name : Image_31102021084538136.png
|
2021-10-31 08:45:38.261022 |
71 |
49196676 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT ARUNDA SHIBTOLA |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT ARUNDA SHIBTOLA1 |
Plinth level |
-
latitude : 22.718707364983857
Longitude : 87.92012309655547
file name : Image_02112021142749229.png
|
2021-11-02 14:27:49.356005 |
72 |
49196676 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT ARUNDA SHIBTOLA |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT ARUNDA SHIBTOLA1 |
Completion of work |
-
latitude : 22.718708
Longitude : 87.9204567
file name : Image_30102021101147342.png
|
2021-10-30 10:11:47.44435 |
73 |
49197302 |
CONSTRUCTION OF COMMUNITY TOILET SYSTEM AT ARUNDA MANSHATOLA |
989033 |
CONSTRUCTION OF COMMUNITY TOILET SYSTEM AT ARUNDA MANSHATOLA1 |
Completion of work |
-
latitude : 22.725689322687685
Longitude : 87.92791449464858
file name : Image_19052022163049192.png
|
2022-05-19 16:30:49.291025 |
74 |
49197302 |
CONSTRUCTION OF COMMUNITY TOILET SYSTEM AT ARUNDA MANSHATOLA |
989033 |
CONSTRUCTION OF COMMUNITY TOILET SYSTEM AT ARUNDA MANSHATOLA1 |
Plinth level |
-
latitude : 22.725751013495028
Longitude : 87.92784132063389
file name : Image_20052022152320628.png
|
2022-05-20 15:23:20.737943 |
75 |
49196873 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT DHARASHIMUL PATRA PARA |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT DHARASHIMUL PATRA PARA1 |
Plinth level |
-
latitude : 22.709151324816048
Longitude : 87.9313740413636
file name : Image_02112021144830305.png
|
2021-11-02 14:48:30.424097 |
76 |
49196873 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT DHARASHIMUL PATRA PARA |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT DHARASHIMUL PATRA PARA1 |
Completion of work |
-
latitude : 22.7090148255229
Longitude : 87.9313637316227
file name : Image_31102021080337175.png
|
2021-10-31 08:03:37.260937 |
77 |
49196937 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR DHARASHIMUL SHIB MONDIR |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR DHARASHIMUL SHIB MONDIR1 |
Completion of work |
-
latitude : 22.699453001841903
Longitude : 87.93084279634058
file name : Image_27012022165504323.png
|
2022-01-27 16:55:04.488217 |
78 |
49196802 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT BANDAIPUR |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT BANDAIPUR1 |
Completion of work |
-
latitude : 22.719048927538097
Longitude : 87.93431307189167
file name : Image_19012022154410701.png
|
2022-01-19 15:44:10.819698 |
79 |
49196622 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR NETAJI POLLIMANGAL SEBA SAMITY |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP NEAR NETAJI POLLIMANGAL SEBA SAMITY1 |
Completion of work |
-
latitude : 22.698496459051967,22.698487783782184
Longitude : 87.89840810000896,87.8984060883522
file name : Image_19012022161834925.png
|
2022-01-19 16:18:35.092614 |
80 |
34797209 |
Construction of Swasan Chulli at Sing Para Swasan |
349926 |
Construction of Swasan Chulli at Sing Para Swasan1 |
Completion of work |
-
latitude : 22.71433557383716
Longitude : 87.92632880620658
file name : Image_24022021162050844.png
|
2021-02-24 16:20:50.962299 |
81 |
34797209 |
Construction of Swasan Chulli at Sing Para Swasan |
349926 |
Construction of Swasan Chulli at Sing Para Swasan1 |
Plinth level |
-
latitude : 22.714251838624477
Longitude : 87.92630910873413
file name : Image_21092021131954335.png
|
2021-09-21 13:19:54.425013 |
82 |
75935968 |
Water Supply to villages |
349197 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.713070000000002
Longitude : 87.93036166666667
file name : Image_06072023182039118.png
|
2023-07-06 18:20:39.208075 |
83 |
58146791 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT KARAK PARA |
349197 |
SOLAR SYSTEM SUBMERSIBLE PUMP AT KARAK PARA1 |
Completion of work |
-
latitude : 22.696095
Longitude : 87.92134833333333
file name : Image_06072023175819816.png
|
2023-07-06 17:58:19.915443 |
84 |
57959769 |
CONSTRUCTION OF CONCRETE ROAD FROM BAR PARA TO MANINDRA BAR LAND |
381701 |
CONSTRUCTION OF CONCRETE ROAD FROM BAR PARA TO MANINDRA BAR LAND1 |
Completion of work |
-
latitude : 22.719033295288682,22.719015777111053
Longitude : 87.93449915014207,87.93454390950501
file name : Image_19052023094520333.png
|
2023-05-19 09:45:20.433194 |
85 |
67468961 |
Drinking water facilities |
1119510 |
Drinking water facilities1 |
Completion of work |
-
latitude : 22.72160166666667
Longitude : 87.92668499999999
file name : Image_11062024123619359.png
|
2024-06-11 12:36:19.469558 |
86 |
87959085 |
Construction of roads |
47252 |
Construction of roads1 |
Roof laid |
-
latitude : 22.719771666666663,22.71981166666667,22.71982666666667
Longitude : 87.92622166666666,87.92617666666665,87.92605166666665
file name : Image_06092024171005736.png
|
2024-09-06 17:10:05.839313 |
87 |
87959085 |
Construction of roads |
47252 |
Construction of roads1 |
Plinth level |
-
latitude : 22.7197566,22.7197566
Longitude : 87.9262298,87.9262298
file name : Image_05092024160603205.png
|
2024-09-05 16:06:32.120355 |
88 |
87959085 |
Construction of roads |
47252 |
Construction of roads1 |
Completion of work |
-
latitude : 22.720007,22.720007
Longitude : 87.9259894,87.9259894
file name : Image_05092024154530632.png
|
2024-09-05 15:45:59.279291 |
89 |
87959085 |
Construction of roads |
47252 |
Construction of roads1 |
Completion of work |
-
latitude : 22.7200108,22.7200108
Longitude : 87.9259879,87.9259879
file name : Image_05092024154533658.png
|
2024-09-05 15:46:02.302451 |
90 |
67493328 |
Construction Toilet |
850000 |
Construction Toilet1 |
Roof laid |
-
latitude : 22.706815
Longitude : 87.87314333333333
file name : Image_12092024140552870.png
|
2024-09-12 14:05:52.968146 |
91 |
67493328 |
Construction Toilet |
850000 |
Construction Toilet1 |
Plinth level |
-
latitude : 22.706805
Longitude : 87.87314833333333
file name : Image_12092024133417715.png
|
2024-09-12 13:34:17.702104 |
92 |
67493328 |
Construction Toilet |
850000 |
Construction Toilet1 |
Completion of work |
-
latitude : 22.70651833333333
Longitude : 87.87319166666666
file name : Image_06092024142258749.png
|
2024-09-06 14:23:45.498235 |
93 |
67469277 |
Drainage Construction |
595853 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.6889292
Longitude : 87.9210325
file name : Image_26072024162408375.png
|
2024-07-26 16:24:08.493937 |
94 |
67469277 |
Drainage Construction |
595853 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.6889512
Longitude : 87.921008
file name : Image_10062024151548566.png
|
2024-06-10 15:15:48.654013 |
95 |
67692663 |
Construction of roads |
184031 |
Construction of roads1 |
Roof laid |
-
latitude : 22.721935,22.721868333333337
Longitude : 87.92286833333334,87.92286166666666
file name : Image_07062024143450757.png
|
2024-06-07 14:34:50.848433 |
96 |
67692663 |
Construction of roads |
184031 |
Construction of roads1 |
Roof laid |
-
latitude : 22.721886666666666,22.72188833333333
Longitude : 87.92286333333335,87.922865
file name : Image_07062024134238520.png
|
2024-06-07 13:42:38.60584 |
97 |
67692663 |
Construction of roads |
184031 |
Construction of roads1 |
Plinth level |
-
latitude : 22.721884999999997,22.721884999999997
Longitude : 87.92285166666667,87.92285166666667
file name : Image_25042024120012093.png
|
2024-04-25 12:00:12.188848 |
98 |
67692663 |
Construction of roads |
184031 |
Construction of roads1 |
Completion of work |
-
latitude : 22.721895000000004,22.721853333333335
Longitude : 87.92286,87.92289833333334
file name : Image_03042024123406986.png
|
2024-04-03 12:34:07.086014 |
99 |
67691825 |
Construction of roads |
215667 |
Construction of roads1 |
Plinth level |
-
latitude : 22.7306401,22.7306401
Longitude : 87.9318147,87.9318147
file name : Image_30062024084427046.png
|
2024-06-30 08:44:27.129358 |
100 |
67691825 |
Construction of roads |
215667 |
Construction of roads1 |
Completion of work |
-
latitude : 22.7215849,22.7215849
Longitude : 87.9265904,87.9265904
file name : Image_10062024150438953.png
|
2024-06-10 15:04:39.043591 |
101 |
67700689 |
Construction of Building |
530938 |
Construction of Building1 |
Roof laid |
-
latitude : 22.69973
Longitude : 87.93279
file name : Image_29082024134608128.png
|
2024-08-29 13:46:08.819371 |
102 |
67700689 |
Construction of Building |
530938 |
Construction of Building1 |
Plinth level |
-
latitude : 22.69980666666667
Longitude : 87.93294166666668
file name : Image_28082024162331676.png
|
2024-08-28 16:23:32.090042 |
103 |
67700689 |
Construction of Building |
530938 |
Construction of Building1 |
Completion of work |
-
latitude : 22.69970166666667
Longitude : 87.93260333333335
file name : Image_26072024153353671.png
|
2024-07-26 15:33:53.785347 |
104 |
67700689 |
Construction of Building |
530938 |
Construction of Building1 |
Completion of work |
-
latitude : 22.69973166666667
Longitude : 87.93282833333333
file name : Image_19062024153702625.png
|
2024-06-19 15:37:02.728689 |
105 |
67702375 |
Construction of roads |
719770 |
Construction of roads1 |
Roof laid |
-
latitude : 22.7435526,22.7435526
Longitude : 87.9325294,87.9325294
file name : Image_04072024104658729.png
|
2024-07-04 10:46:58.840171 |
106 |
67702375 |
Construction of roads |
719770 |
Construction of roads1 |
Plinth level |
-
latitude : 22.7306401,22.7306401
Longitude : 87.9318147,87.9318147
file name : Image_30062024083736220.png
|
2024-06-30 08:37:36.326033 |
107 |
67702375 |
Construction of roads |
719770 |
Construction of roads1 |
Completion of work |
-
latitude : 22.723873333333337,22.723958333333332
Longitude : 87.935105,87.935145
file name : Image_19062024154918244.png
|
2024-06-19 15:49:18.375245 |
108 |
67461258 |
Drinking water facility |
246616 |
Drinking water facility1 |
Plinth level |
-
latitude : 22.696641666666665
Longitude : 87.88626833333335
file name : Image_12092024141522756.png
|
2024-09-12 14:15:22.848639 |
109 |
67461258 |
Drinking water facility |
246616 |
Drinking water facility1 |
Completion of work |
-
latitude : 22.69667
Longitude : 87.886235
file name : Image_06092024144355467.png
|
2024-09-06 14:43:55.589127 |
110 |
67701158 |
Repairing/Construction of Building |
197326 |
Repairing/Construction of Building1 |
Plinth level |
-
latitude : 22.703505000000003
Longitude : 87.935965
file name : Image_10092024145450457.png
|
2024-09-10 14:54:53.946282 |
111 |
67701158 |
Repairing/Construction of Building |
197326 |
Repairing/Construction of Building1 |
Completion of work |
-
latitude : 22.703521666666667
Longitude : 87.93594166666665
file name : Image_29082024134246197.png
|
2024-08-29 13:42:46.842793 |
112 |
67692155 |
Construction of roads |
150367 |
Construction of roads1 |
Plinth level |
-
latitude : 22.700638333333337,22.700638333333337
Longitude : 87.88111666666667,87.88111666666667
file name : Image_04072024121527729.png
|
2024-07-04 12:15:27.815581 |
113 |
67692155 |
Construction of roads |
150367 |
Construction of roads1 |
Completion of work |
-
latitude : 22.700695000000003,22.700693333333334
Longitude : 87.88111333333333,87.88111666666667
file name : Image_01072024125057991.png
|
2024-07-01 12:50:58.095122 |