1 |
34689756 |
installation of sub mersible at talit bag para sansad four |
70000 |
installation of sub mersible at talit bag para sansad four1 |
Completion of work |
-
latitude : 22.759023187682033
Longitude : 87.77963116765022
file name : Image_04032021150651146.png
|
2021-03-04 15:06:51.209907 |
2 |
34689964 |
installation of sub mersible at talit patra para sansad four |
70000 |
installation of sub mersible at talit patra para sansad four1 |
Completion of work |
-
latitude : 22.756758606992662
Longitude : 87.77967240661383
file name : Image_04032021150749000.png
|
2021-03-04 15:07:49.068531 |
3 |
34711606 |
installation of sub mersible at gujrat hazara para sansad seven |
70000 |
installation of sub mersible at gujrat hazara para sansad seven1 |
Completion of work |
-
latitude : 22.750742831267416
Longitude : 87.77680805884302
file name : Image_04032021152230256.png
|
2021-03-04 15:22:30.337303 |
4 |
35067577 |
Installation of submersible at Talit sibtala bene para sansad four |
70000 |
Installation of submersible at Talit sibtala bene para sansad four1 |
Completion of work |
-
latitude : 22.752087037079036
Longitude : 87.7819570619613
file name : Image_04032021151511561.png
|
2021-03-04 15:15:11.647737 |
5 |
34710753 |
installation of sub mersible at gujrat mete para sansad seven |
70000 |
installation of sub mersible at gujrat mete para sansad seven1 |
Completion of work |
-
latitude : 22.75003447663039
Longitude : 87.77104860171676
file name : Image_04032021153110877.png
|
2021-03-04 15:31:10.956755 |
6 |
39119892 |
Pipe Setting of Irrigation from Gujrat Boyaler Sankogora to Kotal para math sansad eight |
550000 |
Pipe Setting of Irrigation from Gujrat Boyaler Sankogora to Kotal para math sansad eight1 |
Completion of work |
-
latitude : 22.752355341799557,22.752355341799557,22.752355341799557
Longitude : 87.77340475469828,87.77340475469828,87.77340475469828
file name : Image_30112021163803184.png
|
2021-11-30 16:38:03.26781 |
7 |
34639575 |
Improvement of road from nadi bundh to sufal patra bari at ghasua sansad two |
320000 |
Improvement of road from nadi bundh to sufal patra bari at ghasua sansad two1 |
Completion of work |
-
latitude : 22.769039436243474,22.769009009934962
Longitude : 87.77884075418115,87.77886472642422
file name : Image_11082021152429214.png
|
2021-08-11 15:24:29.290645 |
8 |
39113901 |
Installation of Solar light at Madanbati Purushtala |
103130 |
Installation of Solar light at Madanbati Purushtala1 |
Completion of work |
-
latitude : 22.7657602
Longitude : 87.775857
file name : Image_09032021133039556.png
|
2021-03-09 13:30:39.697387 |
9 |
34716811 |
New installation of solar light at gujrat bhimtala sansad eight |
80000 |
New installation of solar light at gujrat bhimtala sansad eight1 |
Completion of work |
-
latitude : 22.7662663,22.7662662
Longitude : 87.7742104,87.7742098
file name : Image_09032021132536997.png
|
2021-03-09 13:25:37.08173 |
10 |
34791759 |
Repearing of boulder morrum madanbati purushtala to panhashed tala sansad nine |
250000 |
Repearing of boulder morrum madanbati purushtala to panhashed tala sansad nine1 |
Completion of work |
-
latitude : 22.7579862,22.7579862
Longitude : 87.7693431,87.7693431
file name : Image_04052021135456246.png
|
2021-05-04 13:54:56.379335 |
11 |
34793027 |
Repearing of boulder morrum madanbati pry school to pal para sansad ten |
157198 |
Repearing of boulder morrum madanbati pry school to pal para sansad ten1 |
Completion of work |
-
latitude : 22.75801895186305,22.76187957264483,22.76187957264483
Longitude : 87.7692621666938,87.76235464029014,87.76235464029014
file name : Image_04052021135605608.png
|
2021-05-04 13:56:05.718578 |
12 |
39119852 |
Pipe Setting of Irrigation from Madanbati Purushtala to Choudhury para Math Sansad nine |
300000 |
Pipe Setting of Irrigation from Madanbati Purushtala to Choudhury para Math Sansad nine1 |
Completion of work |
-
latitude : 22.758296309038997,22.758296309038997,22.758296309038997,22.758296309038997,22.758296309038997
Longitude : 87.76876620948315,87.76876620948315,87.76876620948315,87.76876620948315,87.76876620948315
file name : Image_10082021145722418.png
|
2021-08-10 14:57:22.511831 |
13 |
39119911 |
Pipe Setting for Irrigation purpose |
300000 |
Pipe Setting for Irrigation purpose1 |
Completion of work |
-
latitude : 22.76146110612899,22.76146110612899
Longitude : 87.76418072171509,87.76418072171509
file name : Image_10082021150902186.png
|
2021-08-10 15:09:02.261545 |
14 |
34713022 |
Improvement of road from main road to pravakar rajpandit bari gujrat sansad eight |
200000 |
Improvement of road from main road to pravakar rajpandit bari gujrat sansad eight1 |
Completion of work |
-
latitude : 22.756057712249458,22.756057712249458
Longitude : 87.76987588964403,87.76987588964403
file name : Image_02072021134459348.png
|
2021-07-02 13:44:59.495694 |
15 |
34789862 |
C C R from shitala mandir to murari pramanik bari madanbati sansad nine |
200000 |
C C R from shitala mandir to murari pramanik bari madanbati sansad nine1 |
Completion of work |
-
latitude : 22.7662151,22.7662151
Longitude : 87.7758883,87.7758883
file name : Image_09082021154542205.png
|
2021-08-09 15:45:42.293648 |
16 |
34789862 |
C C R from shitala mandir to murari pramanik bari madanbati sansad nine |
200000 |
C C R from shitala mandir to murari pramanik bari madanbati sansad nine1 |
Completion of work |
-
latitude : 22.7662151,22.7662151,22.7662151
Longitude : 87.7758883,87.7758883,87.7758883
file name : Image_09082021154545055.png
|
2021-08-09 15:45:45.141938 |
17 |
34790776 |
installation of sub mersible at madanbati maity para sansad nine |
70000 |
installation of sub mersible at madanbati maity para sansad nine1 |
Completion of work |
-
latitude : 22.76113006286323
Longitude : 87.77170239016414
file name : Image_10082021154804357.png
|
2021-08-10 15:48:04.43565 |
18 |
34792869 |
installation of sub mersible at madanbati laga para sansad ten |
70000 |
installation of sub mersible at madanbati laga para sansad ten1 |
Completion of work |
-
latitude : 22.762789051048458
Longitude : 87.77567960321903
file name : Image_10082021145322922.png
|
2021-08-10 14:53:23.02372 |
19 |
34791377 |
installation of sub mersible at madanbati chowdhury para sansad nine |
70000 |
installation of sub mersible at madanbati chowdhury para sansad nine1 |
Completion of work |
-
latitude : 22.7579583
Longitude : 87.769324
file name : Image_10082021151009770.png
|
2021-08-10 15:10:09.86402 |
20 |
34791377 |
installation of sub mersible at madanbati chowdhury para sansad nine |
70000 |
installation of sub mersible at madanbati chowdhury para sansad nine1 |
Completion of work |
-
latitude : 22.7579583
Longitude : 87.769324
file name : Image_10082021151017115.png
|
2021-08-10 15:10:20.595647 |
21 |
34791005 |
installation of sub mersible at madanbati paramanik para sansad nine |
70000 |
installation of sub mersible at madanbati paramanik para sansad nine1 |
Completion of work |
-
latitude : 22.76014380622655
Longitude : 87.7709393016994
file name : Image_10082021154801350.png
|
2021-08-10 15:48:01.438597 |
22 |
34792623 |
installation of sub mersible at madanbati chowdhury para sansad ten |
70000 |
installation of sub mersible at madanbati chowdhury para sansad ten1 |
Completion of work |
-
latitude : 22.76109335012734
Longitude : 87.77215702459216
file name : Image_10082021145520870.png
|
2021-08-10 14:55:20.971329 |
23 |
34734314 |
Repearing of boulder morrum boyler sankogora to kabadi katan sansad eight |
152000 |
Repearing of boulder morrum boyler sankogora to kabadi katan sansad eight1 |
Completion of work |
-
latitude : 22.75783836375922,22.75783836375922
Longitude : 87.77073838748038,87.77073838748038
file name : Image_10082021151907512.png
|
2021-08-10 15:19:07.619647 |
24 |
34640079 |
Improvement of road from asit hazra bari to nadi bundh at ghasua sansad two |
280000 |
Improvement of road from asit hazra bari to nadi bundh at ghasua sansad two1 |
Completion of work |
-
latitude : 22.766295913606882,22.766295913606882,22.766295913606882,22.766295913606882,22.766295913606882
Longitude : 87.7808291092515,87.7808291092515,87.7808291092515,87.7808291092515,87.7808291092515
file name : Image_03092021161512567.png
|
2021-09-03 16:15:12.634404 |
25 |
49225434 |
Repairing of Boulder Moorum form Satbigha More to Hatkata |
100000 |
Repairing of Boulder Moorum form Satbigha More to Hatkata1 |
Completion of work |
-
latitude : 22.750403489917517,22.750403489917517,22.750403489917517,22.750403489917517,22.750403489917517
Longitude : 87.76834627613425,87.76834627613425,87.76834627613425,87.76834627613425,87.76834627613425
file name : Image_17022022120130760.png
|
2022-02-17 12:01:30.864078 |
26 |
34709847 |
New installation of solar light at gujrat high school math sansad seven |
80000 |
New installation of solar light at gujrat high school math sansad seven 1 |
Completion of work |
-
latitude : 22.761052320711315
Longitude : 87.77504165656865
file name : Image_28092021153328352.png
|
2021-09-28 15:33:28.445469 |
27 |
48982244 |
Installation of Nw Submersable pump at Mohisgote Kalimata Mandir |
95378 |
Installation of Nw Submersable pump at Mohisgote Kalimata Mandir1 |
Completion of work |
-
latitude : 22.76110881473869
Longitude : 87.76990086771548
file name : Image_17022022140231599.png
|
2022-02-17 14:02:31.69482 |
28 |
48991343 |
Installation of Nw Submersable pump with pipeline at Chuyadanga Sardarpara |
100000 |
Installation of Nw Submersable pump with pipeline at Chuyadanga Sardarpara1 |
Completion of work |
-
latitude : 22.770432382822037
Longitude : 87.75419812649488
file name : Image_08032022142505941.png
|
2022-03-08 14:25:06.06003 |
29 |
48991205 |
Installation of Nw Submersable pump at Madanbati Maity para |
100000 |
Installation of Nw Submersable pump at Madanbati Maity para1 |
Completion of work |
-
latitude : 22.760283490642905
Longitude : 87.76942988857627
file name : Image_08032022143719790.png
|
2022-03-08 14:37:19.935553 |
30 |
48989865 |
Mini Pipe Line at Gujrat School Math |
348000 |
Mini Pipe Line at Gujrat School Math1 |
Completion of work |
-
latitude : 22.752075092867017,22.752075092867017,22.752075092867017,22.752075092867017,22.752075092867017,22.752075092867017
Longitude : 87.77147825807333,87.77147825807333,87.77147825807333,87.77147825807333,87.77147825807333,87.77147825807333
file name : Image_08032022144711789.png
|
2022-03-08 14:47:11.950549 |
31 |
48981766 |
Installation of Nw Submersable pump at Ghasua Bag para |
150000 |
Installation of Nw Submersable pump at Ghasua Bag para1 |
Completion of work |
-
latitude : 22.768654371611774
Longitude : 87.78333513066173
file name : Image_08032022152021103.png
|
2022-03-08 15:20:21.1827 |
32 |
48981451 |
Installation of Nw Submersable pump at Ghasua Maity para |
150000 |
Installation of Nw Submersable pump at Ghasua Maity para1 |
Completion of work |
-
latitude : 22.75846059434116,22.75846059434116,22.75846059434116,22.75845996569842,22.75845996569842,22.75845996569842,22.7584636118263,22.7584636118263,22.7584636118263
Longitude : 87.78382178395987,87.78382178395987,87.78382178395987,87.78382823802531,87.78382823802531,87.78382823802531,87.78384483419359,87.78384483419359,87.78384483419359
file name : Image_08032022150830173.png
|
2022-03-08 15:08:30.25194 |
33 |
49224881 |
Construction of Bathing Ghat atMohisgot Shiv pukur Sansad VI |
250000 |
Construction of Bathing Ghat atMohisgot Shiv pukur Sansad VI1 |
Completion of work |
-
latitude : 22.773666121065617
Longitude : 87.76553163304925
file name : Image_23032022145110966.png
|
2022-03-23 14:51:11.090161 |
34 |
48990134 |
Installation of Nw Submersable pump at Gujrat Tapan Mondal house |
150000 |
Installation of Nw Submersable pump at Gujrat Tapan Mondal house1 |
Completion of work |
-
latitude : 22.758257500827312
Longitude : 87.76929410174489
file name : Image_05072022152757886.png
|
2022-07-05 15:27:57.992045 |
35 |
48982469 |
Installation of Tubewell with Chatal and Soke Pit near Gujrat Jayanta Mete House |
100000 |
Installation of Tubewell with Chatal and Soke Pit near Gujrat Jayanta Mete House1 |
Completion of work |
-
latitude : 22.76274592615664
Longitude : 87.77540660463274
file name : Image_08072022142733087.png
|
2022-07-08 14:27:33.182069 |
36 |
48979219 |
CC Covered drain from Mohisgote saheb Ali House to Anuyar Ali House |
303403 |
CC Covered drain from Mohisgote saheb Ali House to Anuyar Ali House1 |
Completion of work |
-
latitude : 22.76852369774133,22.76852369774133,22.76852369774133
Longitude : 87.77093502692878,87.77093502692878,87.77093502692878
file name : Image_14072022125218745.png
|
2022-07-14 12:52:18.860977 |
37 |
48979219 |
CC Covered drain from Mohisgote saheb Ali House to Anuyar Ali House |
303403 |
CC Covered drain from Mohisgote saheb Ali House to Anuyar Ali House1 |
Completion of work |
-
latitude : 22.7673053,22.7673053,22.7673053,22.7673053,22.7673053,22.7673053,22.7673053
Longitude : 87.7694148,87.7694148,87.7694148,87.7694148,87.7694148,87.7694148,87.7694148
file name : Image_14072022125214715.png
|
2022-07-14 12:52:14.834746 |
38 |
48991447 |
Existing Tube Well Repairing Soke pit with drainage under GP area |
600000 |
Existing Tube Well Repairing Soke pit with drainage under GP area1 |
Completion of work |
-
latitude : 22.7662814
Longitude : 87.7760318
file name : Image_26072022163623453.png
|
2022-07-26 16:36:23.620688 |
39 |
48991073 |
Installation of Nw Submersable pump at Madanbati Gayenpara |
100000 |
Installation of Nw Submersable pump at Madanbati Gayenpara1 |
Completion of work |
-
latitude : 22.764855944551528
Longitude : 87.76468615047634
file name : Image_04082022134243415.png
|
2022-08-04 13:42:43.51402 |
40 |
48981589 |
Installation of Nw Tubewell with Chatal and Soke pit at Ghasua Sarkel para |
100000 |
Installation of Nw Tubewell with Chatal and Soke pit at Ghasua Sarkel para1 |
Completion of work |
-
latitude : 22.759833466261625
Longitude : 87.7861856482923
file name : Image_14102022150617472.png
|
2022-10-14 15:06:17.572489 |
41 |
56774144 |
Installation of new Submersible pump with pipeline at Sansad IV |
179264 |
Installation of new Submersible pump with pipeline at Sansad IV1 |
Completion of work |
-
latitude : 22.75759474374354
Longitude : 87.78119900263846
file name : Image_21032023160527739.png
|
2023-03-21 16:05:27.857794 |
42 |
56774144 |
Installation of new Submersible pump with pipeline at Sansad IV |
179264 |
Installation of new Submersible pump with pipeline at Sansad IV1 |
Completion of work |
-
latitude : 22.75756892748177
Longitude : 87.78126128017902
file name : Image_21032023160536625.png
|
2023-03-21 16:05:36.766489 |
43 |
56774817 |
Installation of New Submersible pump with pipeline at Sansad VI |
179264 |
Installation of New Submersible pump with pipeline at Sansad VI1 |
Completion of work |
-
latitude : 22.76827278546989
Longitude : 87.77056974358857
file name : Image_21032023152507987.png
|
2023-03-21 15:25:08.090878 |
44 |
56778599 |
Installation of 2 nos New Submersible pump with pipeline at sansad VIII |
179264 |
Installation of 2 nos New Submersible pump with pipeline at sansad VIII1 |
Completion of work |
-
latitude : 22.7584024
Longitude : 87.7707997
file name : Image_21032023153646948.png
|
2023-03-21 15:36:47.042291 |
45 |
56773071 |
Repairing 30 nos Tubewell with Chatal and Shok pit at Sansad VIII |
80000 |
Repairing 30 nos Tubewell with Chatal and Shok pit at Sansad VIII1 |
Completion of work |
-
latitude : 22.758734221570194
Longitude : 87.770911809057
file name : Image_06042023105640632.png
|
2023-04-06 10:56:40.720322 |
46 |
56773071 |
Repairing 30 nos Tubewell with Chatal and Shok pit at Sansad VIII |
80000 |
Repairing 30 nos Tubewell with Chatal and Shok pit at Sansad VIII1 |
Completion of work |
-
latitude : 22.75875509250909
Longitude : 87.77090644463897
file name : Image_06042023105644384.png
|
2023-04-06 10:56:44.477489 |
47 |
56772156 |
Repairing 15 nos Tubewell with Chatal and Shok pit Sansad I |
80000 |
Repairing 15 nos Tubewell with Chatal and Shok pit Sansad I1 |
Completion of work |
-
latitude : 22.763333371840417
Longitude : 87.78565499000251
file name : Image_06042023103511076.png
|
2023-04-06 10:35:11.189856 |
48 |
56772341 |
Repairing 15 nos Tubewell with Chatal and Shok pit Sansad II |
80000 |
Repairing 15 nos Tubewell with Chatal and Shok pit Sansad II1 |
Completion of work |
-
latitude : 22.76838527061045
Longitude : 87.78341836296022
file name : Image_06042023103922062.png
|
2023-04-06 10:39:22.198707 |
49 |
56772795 |
Repairing 15 nos Tubewell with Chatal and Shok pit at Sansad V |
80000 |
Repairing 15 nos Tubewell with Chatal and Shok pit at Sansad V1 |
Completion of work |
-
latitude : 22.7662746
Longitude : 87.7759528
file name : Image_05042023180153490.png
|
2023-04-05 18:01:53.636089 |
50 |
56772895 |
Repairing 15 nos Tubewell with Chatal and Shok Pit at Sansad VI |
80000 |
Repairing 15 nos Tubewell with Chatal and Shok Pit at Sansad VI1 |
Completion of work |
-
latitude : 22.767655793577433
Longitude : 87.7694682776928
file name : Image_06042023110752220.png
|
2023-04-06 11:07:52.323836 |
51 |
56773194 |
Repairing 15 nos Tubewell with Chatal and Shok pit at Sansad IX |
80000 |
Repairing 15 nos Tubewell with Chatal and Shok pit at Sansad IX1 |
Completion of work |
-
latitude : 22.759435535408556
Longitude : 87.76922084391117
file name : Image_06042023105937013.png
|
2023-04-06 10:59:37.176931 |
52 |
67217710 |
Water Supply to villages |
179264 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.76579786092043
Longitude : 87.78018169105053
file name : Image_06042023102810067.png
|
2023-04-06 10:28:10.171056 |
53 |
69363262 |
CONSTRUCTION OF CC ROAD FROM MADANBATI SISIR DOLUI HOUSE TO BIDYUT MONDAL HOUSE |
39321 |
CONSTRUCTION OF CC ROAD FROM MADANBATI SISIR DOLUI HOUSE TO BIDYUT MONDAL HOUSE1 |
Completion of work |
-
latitude : 22.75685847736895,22.75685847736895,22.75685847736895,22.75685847736895
Longitude : 87.76570530608296,87.76570530608296,87.76570530608296,87.76570530608296
file name : Image_01062023133315210.png
|
2023-06-01 13:33:15.332174 |
54 |
56773417 |
Repairing 15 nos Tubewell with Chatal and Shok Pit at Sansad XI |
80000 |
Repairing 15 nos Tubewell with Chatal and Shok Pit at Sansad XI1 |
Completion of work |
-
latitude : 22.771511720493436
Longitude : 87.7605605777353
file name : Image_08062023130804547.png
|
2023-06-08 13:08:04.646159 |
55 |
67217460 |
Water Supply to villages |
180000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.7626033
Longitude : 87.7718246
file name : Image_08062023124113516.png
|
2023-06-08 12:41:13.614333 |
56 |
67217519 |
Water Supply to villages |
180000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.746208724565804
Longitude : 87.81845941208303
file name : Image_08062023125225651.png
|
2023-06-08 12:52:25.75101 |
57 |
67217650 |
Water Supply to villages |
180000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.765566143207252
Longitude : 87.7615883667022
file name : Image_08062023130216129.png
|
2023-06-08 13:02:16.245903 |
58 |
69362419 |
CONSTRUCTION OF CC ROAD FROM MADANBATI MIRMAL MAITY SHOP TO SUBHASH PRAMANIK |
338940 |
CONSTRUCTION OF CC ROAD FROM MADANBATI MIRMAL MAITY SHOP TO SUBHASH PRAMANIK1 |
Completion of work |
-
latitude : 22.7579203,22.7579203,22.7579176,22.7579176,22.7579176
Longitude : 87.769436,87.769436,87.7694357,87.7694357,87.7694357
file name : Image_01062023132038733.png
|
2023-06-01 13:20:38.844607 |
59 |
69364098 |
CONSTRUVTION OF CC ROAD MADANBATI UTTAM SAMANTA HOUSE TO KALIPADA SAMANTA HOUSE |
145976 |
CONSTRUVTION OF CC ROAD MADANBATI UTTAM SAMANTA HOUSE TO KALIPADA SAMANTA HOUSE1 |
Completion of work |
-
latitude : 22.759979437105358,22.759979437105358,22.759979437105358,22.759979437105358
Longitude : 87.76758184656501,87.76758184656501,87.76758184656501,87.76758184656501
file name : Image_01062023140420069.png
|
2023-06-01 14:04:20.216694 |
60 |
69364649 |
CONSTRUCTION OF CC ROAD FROM MADANBATI AJAY SAMANTA HOUSE TO MOHAN PRAMANIK HOUSE |
47653 |
CONSTRUCTION OF CC ROAD FROM MADANBATI AJAY SAMANTA HOUSE TO MOHAN PRAMANIK HOUSE1 |
Completion of work |
-
latitude : 22.75911266449839,22.75911266449839,22.75911266449839,22.75911266449839,22.75911266449839
Longitude : 87.76816355064511,87.76816355064511,87.76816355064511,87.76816355064511,87.76816355064511
file name : Image_01062023140038191.png
|
2023-06-01 14:00:38.314249 |
61 |
67217413 |
Water Supply to villages |
180000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.768506221473217
Longitude : 87.78250289149582
file name : Image_08062023132356111.png
|
2023-06-08 13:23:56.215993 |
62 |
56842470 |
Installation of New Submersible pump with pipeline at Sabsad XI |
100000 |
Installation of New Submersible pump with pipeline at Sabsad XI1 |
Completion of work |
-
latitude : 22.7714242
Longitude : 87.7587371
file name : Image_01062023141305703.png
|
2023-06-01 14:13:05.849916 |
63 |
67217339 |
Construction of Stadium at Madanbati Purushtala Play Ground Sansad IX |
762777 |
Construction of Stadium at Madanbati Purushtala Play Ground Sansad IX1 |
Completion of work |
-
latitude : 22.758097532205284
Longitude : 87.76879554614425
file name : Image_17032023131615559.png
|
2023-03-17 13:16:15.740234 |
64 |
49224049 |
Construction of Shed at 2nd Floor Slab |
448542 |
Construction of Shed at 2nd Floor Slab1 |
Roof laid |
-
latitude : 22.7662927
Longitude : 87.7760358
file name : Image_25082023150107560.png
|
2023-08-25 15:01:07.673566 |
65 |
49224049 |
Construction of Shed at 2nd Floor Slab |
448542 |
Construction of Shed at 2nd Floor Slab1 |
Plinth level |
-
latitude : 22.7662988
Longitude : 87.7759597
file name : Image_25082023143048800.png
|
2023-08-25 14:30:48.953418 |
66 |
49224049 |
Construction of Shed at 2nd Floor Slab |
448542 |
Construction of Shed at 2nd Floor Slab1 |
Completion of work |
-
latitude : 22.7660843
Longitude : 87.7742756
file name : Image_07022022134557882.png
|
2022-02-07 13:45:57.999975 |
67 |
49223667 |
Renovation of Office Building at 2nd Floor |
447119 |
Renovation of Office Building at 2nd Floor1 |
Completion of work |
-
latitude : 22.7662919
Longitude : 87.7760353
file name : Image_25082023150225513.png
|
2023-08-25 15:02:25.622208 |
68 |
49223667 |
Renovation of Office Building at 2nd Floor |
447119 |
Renovation of Office Building at 2nd Floor1 |
Completion of work |
-
latitude : 22.766293
Longitude : 87.7760357
file name : Image_25082023143241254.png
|
2023-08-25 14:32:41.351562 |
69 |
49223667 |
Renovation of Office Building at 2nd Floor |
447119 |
Renovation of Office Building at 2nd Floor1 |
Completion of work |
-
latitude : 22.7661023
Longitude : 87.775886
file name : Image_07022022134554693.png
|
2022-02-07 13:45:54.822783 |
70 |
49223855 |
Office Building Repairing and Colouring |
345000 |
Office Building Repairing and Colouring1 |
Plinth level |
-
latitude : 22.7662923
Longitude : 87.7760355
file name : Image_25082023145940494.png
|
2023-08-25 14:59:40.575435 |
71 |
49223855 |
Office Building Repairing and Colouring |
345000 |
Office Building Repairing and Colouring1 |
Completion of work |
-
latitude : 22.7662804
Longitude : 87.7759848
file name : Image_29062022145056249.png
|
2022-06-29 14:50:56.362427 |
72 |
56843431 |
Renovation of Office Building |
344336 |
Renovation of Office Building1 |
Completion of work |
-
latitude : 22.7662388
Longitude : 87.7760293
file name : Image_08062023122355982.png
|
2023-06-08 12:23:56.095075 |
73 |
58690776 |
CC Covered drain from Madanbati Sanjib Shaw Shop to Purushtala Play Ground |
220140 |
CC Covered drain from Madanbati Sanjib Shaw Shop to Purushtala Play Ground1 |
Completion of work |
-
latitude : 22.7583288,22.7583288,22.7583288,22.7583288,22.7583288,22.7583288
Longitude : 87.7690722,87.7690722,87.7690722,87.7690722,87.7690722,87.7690722
file name : Image_27092023164908133.png
|
2023-09-27 16:49:08.221612 |
74 |
67290620 |
Installation of RO/Water Supply |
38000 |
Installation of RO/Water Supply1 |
Plinth level |
-
latitude : 22.7663532
Longitude : 87.7760493
file name : Image_05012024133616164.png
|
2024-01-05 13:36:16.263285 |
75 |
67290620 |
Installation of RO/Water Supply |
38000 |
Installation of RO/Water Supply1 |
Completion of work |
-
latitude : 22.7663514
Longitude : 87.7760511
file name : Image_05012024133317740.png
|
2024-01-05 13:33:17.832123 |
76 |
56842841 |
Construction of Community Toilet at Gujrat Gumtigora |
200000 |
Construction of Community Toilet at Gujrat Gumtigora1 |
Plinth level |
-
latitude : 22.7662157
Longitude : 87.7760104
file name : Image_28022024163527056.png
|
2024-02-28 16:35:27.227578 |
77 |
56842841 |
Construction of Community Toilet at Gujrat Gumtigora |
200000 |
Construction of Community Toilet at Gujrat Gumtigora1 |
Completion of work |
-
latitude : 22.766215
Longitude : 87.7760061
file name : Image_28022024163127866.png
|
2024-02-28 16:31:27.98017 |
78 |
56842841 |
Construction of Community Toilet at Gujrat Gumtigora |
200000 |
Construction of Community Toilet at Gujrat Gumtigora1 |
Completion of work |
-
latitude : 22.7662165
Longitude : 87.7760111
file name : Image_28022024162734801.png
|
2024-02-28 16:27:34.885752 |
79 |
67240432 |
Operation and Maintenance of drinking water supply system |
95000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 22.76013328693807
Longitude : 87.76941765099764
file name : Image_29112023161932787.png
|
2023-11-29 16:19:32.874197 |
80 |
67240432 |
Operation and Maintenance of drinking water supply system |
95000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 22.7601455245167
Longitude : 87.76939493604004
file name : Image_29112023161625176.png
|
2023-11-29 16:16:25.267869 |
81 |
67240432 |
Operation and Maintenance of drinking water supply system |
95000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 22.7602121187374
Longitude : 87.76949878782034
file name : Image_24112023165305787.png
|
2023-11-24 16:53:05.884377 |
82 |
67240432 |
Operation and Maintenance of drinking water supply system |
95000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 22.760202018544078
Longitude : 87.76947003789246
file name : Image_24112023154059524.png
|
2023-11-24 15:40:59.612896 |
83 |
67240468 |
Operation and Maintenance of drinking water supply system |
95000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 22.763926098123193
Longitude : 87.76622255332768
file name : Image_29112023161014521.png
|
2023-11-29 16:10:14.618498 |
84 |
67240468 |
Operation and Maintenance of drinking water supply system |
95000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 22.763946591876447
Longitude : 87.7662352938205
file name : Image_24112023164642135.png
|
2023-11-24 16:46:42.221067 |
85 |
67240468 |
Operation and Maintenance of drinking water supply system |
95000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 22.763888966292143
Longitude : 87.76619656942785
file name : Image_24112023153517052.png
|
2023-11-24 15:35:17.149874 |
86 |
67245750 |
Construction of roads |
209903 |
Construction of roads1 |
Roof laid |
-
latitude : 22.765023917891085,22.765023917891085,22.765023917891085,22.765023917891085
Longitude : 87.75504444725811,87.75504444725811,87.75504444725811,87.75504444725811
file name : Image_05122023153147854.png
|
2023-12-05 15:31:47.961541 |
87 |
67245750 |
Construction of roads |
209903 |
Construction of roads1 |
Plinth level |
-
latitude : 22.765024253167212,22.765024253167212,22.765024253167212,22.765024253167212,22.765024253167212,22.765024253167212
Longitude : 87.75502055883408,87.75502055883408,87.75502055883408,87.75502055883408,87.75502055883408,87.75502055883408
file name : Image_05122023151601953.png
|
2023-12-05 15:16:02.051945 |
88 |
67245750 |
Construction of roads |
209903 |
Construction of roads1 |
Completion of work |
-
latitude : 22.76508254930377,22.76508254930377,22.76508254930377,22.76508254930377,22.76508254930377
Longitude : 87.75505785830319,87.75505785830319,87.75505785830319,87.75505785830319,87.75505785830319
file name : Image_05122023150941666.png
|
2023-12-05 15:09:41.767495 |
89 |
67244675 |
Construction of roads |
112261 |
Construction of road from nadibundh to pintu maity bari I |
Roof laid |
-
latitude : 22.759409761056304,22.759409761056304,22.759409761056304,22.759409761056304,22.759410180151463
Longitude : 87.78536405414343,87.78536405414343,87.78536405414343,87.78536405414343,87.7853639703244
file name : Image_05122023124922651.png
|
2023-12-05 12:49:22.742833 |
90 |
67244675 |
Construction of roads |
112261 |
Construction of road from nadibundh to pintu maity bari I |
Plinth level |
-
latitude : 22.75941638275981,22.75941638275981,22.75941638275981,22.75941638275981,22.75941638275981,22.75941638275981
Longitude : 87.78537813574076,87.78537813574076,87.78537813574076,87.78537813574076,87.78537813574076,87.78537813574076
file name : Image_05122023123712413.png
|
2023-12-05 12:37:12.506524 |
91 |
67244675 |
Construction of roads |
112261 |
Construction of road from nadibundh to pintu maity bari I |
Completion of work |
-
latitude : 22.742526051588356,22.742526051588356,22.742526051588356,22.742526051588356,22.742526051588356,22.742526051588356
Longitude : 87.83855536021292,87.83855536021292,87.83855536021292,87.83855536021292,87.83855536021292,87.83855536021292
file name : Image_04122023165210043.png
|
2023-12-04 16:52:10.123132 |
92 |
67244675 |
Construction of roads |
112261 |
Construction of road from nadibundh to pintu maity bari I |
Completion of work |
-
latitude : 22.7597405,22.7597405,22.7597405,22.7597405,22.7597405
Longitude : 87.7856326,87.7856326,87.7856326,87.7856326,87.7856326
file name : Image_04122023165804334.png
|
2023-12-04 16:58:04.411993 |
93 |
67240507 |
Operation and Maintenance of drinking water supply system |
96000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad XI |
Roof laid |
-
latitude : 22.7653963
Longitude : 87.7551236
file name : Image_06122023152205732.png
|
2023-12-06 15:22:05.90388 |
94 |
67240507 |
Operation and Maintenance of drinking water supply system |
96000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad XI |
Roof laid |
-
latitude : 22.7653963
Longitude : 87.7551236
file name : Image_06122023152240669.png
|
2023-12-06 15:22:40.750156 |
95 |
67240507 |
Operation and Maintenance of drinking water supply system |
96000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad XI |
Plinth level |
-
latitude : 22.7653963
Longitude : 87.7551236
file name : Image_06122023151746970.png
|
2023-12-06 15:17:47.18122 |
96 |
67240507 |
Operation and Maintenance of drinking water supply system |
96000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad XI |
Completion of work |
-
latitude : 22.7653963
Longitude : 87.7551236
file name : Image_06122023151234618.png
|
2023-12-06 15:12:34.70676 |
97 |
67240296 |
Operation and Maintenance of drinking water supply system |
90000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad VII |
Roof laid |
-
latitude : 22.752415859140456
Longitude : 87.76977472007275
file name : Image_06122023154216912.png
|
2023-12-06 15:42:16.999531 |
98 |
67240296 |
Operation and Maintenance of drinking water supply system |
90000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad VII |
Plinth level |
-
latitude : 22.752417577430606
Longitude : 87.76975544169545
file name : Image_06122023153909224.png
|
2023-12-06 15:39:09.317223 |
99 |
67240296 |
Operation and Maintenance of drinking water supply system |
90000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad VII |
Completion of work |
-
latitude : 22.760924
Longitude : 87.763194
file name : Image_06122023153258511.png
|
2023-12-06 15:32:58.675049 |
100 |
67240164 |
Operation and Maintenance of drinking water supply system |
91000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad VI |
Roof laid |
-
latitude : 22.77156276628375
Longitude : 87.76059536263347
file name : Image_06122023150504889.png
|
2023-12-06 15:05:04.97947 |
101 |
67240164 |
Operation and Maintenance of drinking water supply system |
91000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad VI |
Plinth level |
-
latitude : 22.771527939476073
Longitude : 87.76056602597237
file name : Image_06122023150016536.png
|
2023-12-06 15:00:16.620491 |
102 |
67240164 |
Operation and Maintenance of drinking water supply system |
91000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad VI |
Completion of work |
-
latitude : 22.77152756229043
Longitude : 87.760522775352
file name : Image_06122023145500114.png
|
2023-12-06 14:55:00.206029 |
103 |
67239818 |
Prefer a water purification system that wastes less water |
92000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad IV |
Roof laid |
-
latitude : 22.764688013121486
Longitude : 87.78007364831865
file name : Image_13122023160329719.png
|
2023-12-13 16:03:29.897915 |
104 |
67239818 |
Prefer a water purification system that wastes less water |
92000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad IV |
Plinth level |
-
latitude : 22.764678332023323
Longitude : 87.78007239103317
file name : Image_13122023160129256.png
|
2023-12-13 16:01:29.344616 |
105 |
67239818 |
Prefer a water purification system that wastes less water |
92000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad IV |
Completion of work |
-
latitude : 22.76467673946172
Longitude : 87.78004079125822
file name : Image_13122023155921779.png
|
2023-12-13 15:59:21.872065 |
106 |
67239721 |
Operation and Maintenance of piped water supply system |
90000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad III |
Roof laid |
-
latitude : 22.76529503054917
Longitude : 87.78113362379372
file name : Image_13122023162410140.png
|
2023-12-13 16:24:10.246019 |
107 |
67239721 |
Operation and Maintenance of piped water supply system |
90000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad III |
Plinth level |
-
latitude : 22.76533216238022
Longitude : 87.78120562434196
file name : Image_13122023161659005.png
|
2023-12-13 16:16:59.11705 |
108 |
67239721 |
Operation and Maintenance of piped water supply system |
90000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad III |
Completion of work |
-
latitude : 22.76529410853982
Longitude : 87.78113496489823
file name : Image_13122023161050464.png
|
2023-12-13 16:10:50.56554 |
109 |
67239679 |
Operation and Maintenance of drinking water supply system |
89000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad II 67239679 |
Roof laid |
-
latitude : 22.768508149310946
Longitude : 87.78252275660634
file name : Image_13122023151008139.png
|
2023-12-13 15:10:08.23966 |
110 |
67239679 |
Operation and Maintenance of drinking water supply system |
89000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad II 67239679 |
Plinth level |
-
latitude : 22.768567032180727
Longitude : 87.78250699862838
file name : Image_13122023150356891.png
|
2023-12-13 15:03:56.988548 |
111 |
67239679 |
Operation and Maintenance of drinking water supply system |
89000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad II 67239679 |
Completion of work |
-
latitude : 22.76849607937038
Longitude : 87.78251429088414
file name : Image_13122023145318453.png
|
2023-12-13 14:53:18.540017 |
112 |
67239954 |
Water Supply to villages |
90000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad V |
Roof laid |
-
latitude : 22.77563767042011
Longitude : 87.76587562635541
file name : Image_06122023144741196.png
|
2023-12-06 14:47:41.280603 |
113 |
67239954 |
Water Supply to villages |
90000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad V |
Plinth level |
-
latitude : 22.775642699562013
Longitude : 87.76587327942252
file name : Image_06122023144347613.png
|
2023-12-06 14:43:47.699518 |
114 |
67239954 |
Water Supply to villages |
90000 |
Repair of Hand Pump Tubewell Platfrom and chatal at Sansad V |
Completion of work |
-
latitude : 22.775634611025453
Longitude : 87.76589113287628
file name : Image_06122023143652669.png
|
2023-12-06 14:36:52.756118 |
115 |
67239468 |
Augmentation of existing sources of Drinking Water |
93000 |
Augmentation of existing sources of Drinking Water1 |
Roof laid |
-
latitude : 22.7661107
Longitude : 87.7759637
file name : Image_21122023172011544.png
|
2023-12-21 17:20:11.742339 |
116 |
67239468 |
Augmentation of existing sources of Drinking Water |
93000 |
Augmentation of existing sources of Drinking Water1 |
Plinth level |
-
latitude : 22.7661107
Longitude : 87.7759637
file name : Image_21122023171342310.png
|
2023-12-21 17:13:42.576404 |
117 |
67239468 |
Augmentation of existing sources of Drinking Water |
93000 |
Augmentation of existing sources of Drinking Water1 |
Completion of work |
-
latitude : 22.760740178637207
Longitude : 87.78627424500883
file name : Image_14122023152735579.png
|
2023-12-14 15:27:35.673713 |
118 |
67290517 |
Procurement of Computer |
100000 |
Procurement of Computer1 |
Roof laid |
-
latitude : 22.7663346
Longitude : 87.7760363
file name : Image_08122023164325948.png
|
2023-12-08 16:43:26.131044 |
119 |
67290517 |
Procurement of Computer |
100000 |
Procurement of Computer1 |
Plinth level |
-
latitude : 22.7663362
Longitude : 87.7760297
file name : Image_08122023163141351.png
|
2023-12-08 16:31:41.468607 |
120 |
67290517 |
Procurement of Computer |
100000 |
Procurement of Computer1 |
Completion of work |
-
latitude : 22.7663362
Longitude : 87.7760297
file name : Image_08122023162225869.png
|
2023-12-08 16:22:25.958967 |
121 |
34703557 |
Repearing of boulder morrum noukaghat to badal sau shop sansad five |
153000 |
Repearing of boulder morrum noukaghat to badal sau shop sansad five1 |
Roof laid |
-
latitude : 22.766240006312728,22.766240006312728,22.766240006312728,22.766240006312728
Longitude : 87.77606190182269,87.77606190182269,87.77606190182269,87.77606190182269
file name : Image_12122023122531269.png
|
2023-12-12 12:25:31.384498 |
122 |
34703557 |
Repearing of boulder morrum noukaghat to badal sau shop sansad five |
153000 |
Repearing of boulder morrum noukaghat to badal sau shop sansad five1 |
Plinth level |
-
latitude : 22.766224038787186,22.766224038787186,22.766224038787186,22.766224038787186,22.766224038787186
Longitude : 87.77609065175056,87.77609065175056,87.77609065175056,87.77609065175056,87.77609065175056
file name : Image_12122023121536248.png
|
2023-12-12 12:15:36.337125 |
123 |
34703557 |
Repearing of boulder morrum noukaghat to badal sau shop sansad five |
153000 |
Repearing of boulder morrum noukaghat to badal sau shop sansad five1 |
Completion of work |
-
latitude : 22.766223,22.766223,22.766223,22.766223,22.766223,22.766223
Longitude : 87.7760139,87.7760139,87.7760139,87.7760139,87.7760139,87.7760139
file name : Image_11122023163741958.png
|
2023-12-11 16:37:42.051779 |
124 |
34796330 |
Computer maintenance of office purpose |
400000 |
Computer maintenance of office purpose1 |
Plinth level |
-
latitude : 22.7661818
Longitude : 87.7760021
file name : Image_16122023134748725.png
|
2023-12-16 13:47:48.932812 |
125 |
34796330 |
Computer maintenance of office purpose |
400000 |
Computer maintenance of office purpose1 |
Completion of work |
-
latitude : 22.7662811
Longitude : 87.7760255
file name : Image_11082021130027216.png
|
2021-08-11 13:00:27.437154 |
126 |
34794134 |
construction of ladies toilet at office building |
320000 |
construction of ladies toilet at office building1 |
Completion of work |
-
latitude : 22.76576
Longitude : 87.7758781
file name : Image_09032021153809717.png
|
2021-03-09 15:38:09.816732 |
127 |
67581416 |
Construction of Sheds |
350000 |
Construction of Waiting Shed at Madanbati Purushtala South Side IX |
Plinth level |
-
latitude : 22.757792472839355
Longitude : 87.76901129633188
file name : Image_27122023140150166.png
|
2023-12-27 14:01:50.259095 |
128 |
67581416 |
Construction of Sheds |
350000 |
Construction of Waiting Shed at Madanbati Purushtala South Side IX |
Completion of work |
-
latitude : 22.7574616
Longitude : 87.7687274
file name : Image_27122023135234013.png
|
2023-12-27 13:52:34.106739 |
129 |
67245625 |
Construction of roads |
277694 |
Concrete Road from Madanbati Main Road to Nimdanga Swasan |
Plinth level |
-
latitude : 22.765537602826953,22.765537602826953,22.765537602826953,22.765537602826953,22.765537602826953
Longitude : 87.76456201449037,87.76456201449037,87.76456201449037,87.76456201449037,87.76456201449037
file name : Image_12032024142731229.png
|
2024-03-12 14:27:31.330291 |
130 |
67245625 |
Construction of roads |
277694 |
Concrete Road from Madanbati Main Road to Nimdanga Swasan |
Completion of work |
-
latitude : 22.76551455259323,22.76551455259323,22.76551455259323,22.76551455259323,22.76551455259323,22.76551455259323
Longitude : 87.76455673389137,87.76455673389137,87.76455673389137,87.76455673389137,87.76455673389137,87.76455673389137
file name : Image_12032024142158588.png
|
2024-03-12 14:21:58.695501 |
131 |
67245107 |
Construction of roads |
269778 |
Concrete Road from Nandalal Bag House to Haru Bhaumick House V |
Plinth level |
-
latitude : 22.763270465657115,22.763270465657115,22.763270465657115,22.763270465657115
Longitude : 87.77012432925403,87.77012432925403,87.77012432925403,87.77012432925403
file name : Image_12032024144459365.png
|
2024-03-12 14:44:59.455889 |
132 |
67245107 |
Construction of roads |
269778 |
Concrete Road from Nandalal Bag House to Haru Bhaumick House V |
Completion of work |
-
latitude : 22.763202195055783,22.763202195055783
Longitude : 87.77017319574952,87.77017319574952
file name : Image_12032024144032162.png
|
2024-03-12 14:40:32.258613 |
133 |
67246196 |
Computer in GP Bhawan |
98132 |
Computer in GP Bhawan1 |
Plinth level |
-
latitude : 22.742639877833426
Longitude : 87.83854060806334
file name : Image_23032024140924993.png
|
2024-03-23 14:09:25.117274 |
134 |
67246196 |
Computer in GP Bhawan |
98132 |
Computer in GP Bhawan1 |
Completion of work |
-
latitude : 22.742639877833426
Longitude : 87.83854060806334
file name : Image_23032024140646813.png
|
2024-03-23 14:06:46.93189 |
135 |
67734499 |
Construction of Sheds |
327104 |
Construction of New Swashan Chulli at Ghasua Swashan III |
Plinth level |
-
latitude : 22.76323337573558
Longitude : 87.77278642170131
file name : Image_28032024175346007.png
|
2024-03-28 17:53:46.089802 |
136 |
67734499 |
Construction of Sheds |
327104 |
Construction of New Swashan Chulli at Ghasua Swashan III |
Completion of work |
-
latitude : 22.76323337573558
Longitude : 87.77278642170131
file name : Image_28032024175017957.png
|
2024-03-28 17:50:18.046701 |
137 |
67151484 |
Drainage line for grey water |
557566 |
Drain from Mohisgote Dildar Ali Bari to Babna Pukur Ghat VI |
Plinth level |
-
latitude : 22.7690545
Longitude : 87.7702584
file name : Image_28032024173049188.png
|
2024-03-28 17:30:49.287879 |
138 |
67151484 |
Drainage line for grey water |
557566 |
Drain from Mohisgote Dildar Ali Bari to Babna Pukur Ghat VI |
Completion of work |
-
latitude : 22.7690562
Longitude : 87.7702657
file name : Image_28032024172612537.png
|
2024-03-28 17:26:12.646566 |
139 |
67164167 |
Drinking water facilities |
181489 |
Installation of Submersible with Over Head Tank near Mohisgote Manshatala V |
Plinth level |
-
latitude : 22.763792322948575
Longitude : 87.78142372146249
file name : Image_25012024134244563.png
|
2024-01-25 13:42:44.66975 |
140 |
67164167 |
Drinking water facilities |
181489 |
Installation of Submersible with Over Head Tank near Mohisgote Manshatala V |
Completion of work |
-
latitude : 22.76379802264273
Longitude : 87.7814179379493
file name : Image_25012024133658606.png
|
2024-01-25 13:36:58.722428 |
141 |
67169371 |
Pipeline connection for water supply to all houses |
181489 |
Installation of Submersible with Over Head Tank at GP Office V |
Plinth level |
-
latitude : 22.7662541
Longitude : 87.7759943
file name : Image_25012024122555846.png
|
2024-01-25 12:25:55.956425 |
142 |
67169371 |
Pipeline connection for water supply to all houses |
181489 |
Installation of Submersible with Over Head Tank at GP Office V |
Completion of work |
-
latitude : 22.7662376
Longitude : 87.7760324
file name : Image_25012024121921848.png
|
2024-01-25 12:19:21.957205 |
143 |
67164342 |
Pipeline connection for water supply to all houses |
181126 |
Installation of Submersible with Over Head Tank at Gujrat Shibtala VIII |
Plinth level |
-
latitude : 22.760355239734054
Longitude : 87.77063889428973
file name : Image_16012024162303147.png
|
2024-01-16 16:23:03.239083 |
144 |
67164342 |
Pipeline connection for water supply to all houses |
181126 |
Installation of Submersible with Over Head Tank at Gujrat Shibtala VIII |
Completion of work |
-
latitude : 22.760413829237223
Longitude : 87.77072262950242
file name : Image_16012024161903589.png
|
2024-01-16 16:19:03.686419 |
145 |
56773816 |
Installation of new Submersable pump with pipeline at Sansad I |
179375 |
Installation of new Submersable pump with pipeline at Sansad I1 |
Plinth level |
-
latitude : 22.760335709899664
Longitude : 87.78616544790566
file name : Image_03072024180110206.png
|
2024-07-03 18:01:10.311769 |
146 |
56773816 |
Installation of new Submersable pump with pipeline at Sansad I |
179375 |
Installation of new Submersable pump with pipeline at Sansad I1 |
Completion of work |
-
latitude : 22.760259895585477
Longitude : 87.7861959580332
file name : Image_17102023124158608.png
|
2023-10-17 12:41:58.701431 |