1 |
34656740 |
Improvement of Boundary Wall of Chandrapur Idga And Tile pilling of Dargatala |
348015 |
Improvement of Boundary Wall of Chandrapur Idga And Tile pilling of Dargatala1 |
Roof laid |
-
latitude : 22.471351199783385,22.471409747377038
Longitude : 87.98037213273346,87.98036894761026
file name : Image_02022021172951122.png
|
2021-02-02 17:29:51.205572 |
2 |
34656740 |
Improvement of Boundary Wall of Chandrapur Idga And Tile pilling of Dargatala |
348015 |
Improvement of Boundary Wall of Chandrapur Idga And Tile pilling of Dargatala1 |
Plinth level |
-
latitude : 22.471330286934972,22.471343236975372
Longitude : 87.98041261732578,87.98034916631877
file name : Image_02022021172545440.png
|
2021-02-02 17:25:45.532158 |
3 |
34656740 |
Improvement of Boundary Wall of Chandrapur Idga And Tile pilling of Dargatala |
348015 |
Improvement of Boundary Wall of Chandrapur Idga And Tile pilling of Dargatala1 |
Completion of work |
-
latitude : 22.47134143486619,22.471328149549663
Longitude : 87.98034849576652,87.98039241693914
file name : Image_02022021172126973.png
|
2021-02-02 17:21:27.077036 |
4 |
34583988 |
Improvement of Pcc road from Chandrapur ICDS Centre to Subir pal house |
349611 |
Improvement of Pcc road from Chandrapur ICDS Centre to Subir pal house1 |
Roof laid |
-
latitude : 22.46818317566067,22.468195036053658
Longitude : 87.97803794033825,87.98013777472079
file name : Image_26112020140133862.png
|
2020-11-26 14:01:33.95937 |
5 |
34583988 |
Improvement of Pcc road from Chandrapur ICDS Centre to Subir pal house |
349611 |
Improvement of Pcc road from Chandrapur ICDS Centre to Subir pal house1 |
Plinth level |
-
latitude : 22.468226007185876,22.468226007185876
Longitude : 87.97806174494326,87.97806174494326
file name : Image_26112020134613412.png
|
2020-11-26 13:46:13.535363 |
6 |
34583988 |
Improvement of Pcc road from Chandrapur ICDS Centre to Subir pal house |
349611 |
Improvement of Pcc road from Chandrapur ICDS Centre to Subir pal house1 |
Completion of work |
-
latitude : 22.469628,22.46817043516785
Longitude : 87.9783438,87.97807046212256
file name : Image_25112020143435483.png
|
2020-11-25 14:34:35.585615 |
7 |
34583279 |
Improvement of Pcc Road From Chanchal Malik house to Guna Bag house |
3488350 |
Improvement of Pcc Road From Chanchal Malik house to Guna Bag house1 |
Roof laid |
-
latitude : 22.4695654,22.471035202033818
Longitude : 87.9701179,87.96936652623117
file name : Image_03122020162325401.png
|
2020-12-03 16:23:25.488267 |
8 |
34583279 |
Improvement of Pcc Road From Chanchal Malik house to Guna Bag house |
3488350 |
Improvement of Pcc Road From Chanchal Malik house to Guna Bag house1 |
Plinth level |
-
latitude : 22.4695653,22.4695654
Longitude : 87.9701156,87.9701145
file name : Image_03122020161803645.png
|
2020-12-03 16:18:03.726047 |
9 |
34583279 |
Improvement of Pcc Road From Chanchal Malik house to Guna Bag house |
3488350 |
Improvement of Pcc Road From Chanchal Malik house to Guna Bag house1 |
Completion of work |
-
latitude : 22.47053890954703,22.47051585931331
Longitude : 87.96979282982647,87.96968210488558
file name : Image_03122020122512282.png
|
2020-12-03 12:25:12.37164 |
10 |
34613858 |
Improvement of Pcc road from Tapas Bar house to Matiyar Rahaman house |
334196 |
Improvement of Pcc road from Tapas Bar house to Matiyar Rahaman house1 |
Roof laid |
-
latitude : 22.47044997755438,22.470558020286262
Longitude : 87.99477400258183,87.9939971677959
file name : Image_04122020162203708.png
|
2020-12-04 16:22:03.788575 |
11 |
34613858 |
Improvement of Pcc road from Tapas Bar house to Matiyar Rahaman house |
334196 |
Improvement of Pcc road from Tapas Bar house to Matiyar Rahaman house1 |
Plinth level |
-
latitude : 22.47051837388426,22.470528264530003
Longitude : 87.99485036171973,87.99480392597616
file name : Image_04122020161542017.png
|
2020-12-04 16:15:42.089381 |
12 |
34613858 |
Improvement of Pcc road from Tapas Bar house to Matiyar Rahaman house |
334196 |
Improvement of Pcc road from Tapas Bar house to Matiyar Rahaman house1 |
Completion of work |
-
latitude : 22.47050299309194,22.470439081080258
Longitude : 87.9947947897017,87.9945410694927
file name : Image_04122020112508194.png
|
2020-12-04 11:25:08.281972 |
13 |
34614563 |
Improvement of Pcc road from Saiyad Rabu house to Sk Sahabul house |
335442 |
Improvement of Pcc road from Saiyad Rabu house to Sk Sahabul house1 |
Roof laid |
-
latitude : 22.47188525274396,22.471960899420083
Longitude : 87.98215412534773,87.98216912895441
file name : Image_01022021141909096.png
|
2021-02-01 14:19:09.194355 |
14 |
34614563 |
Improvement of Pcc road from Saiyad Rabu house to Sk Sahabul house |
335442 |
Improvement of Pcc road from Saiyad Rabu house to Sk Sahabul house1 |
Plinth level |
-
latitude : 22.47185335960239,22.4718771642074
Longitude : 87.98214758746326,87.98215311951935
file name : Image_01022021141443353.png
|
2021-02-01 14:14:43.574605 |
15 |
34614563 |
Improvement of Pcc road from Saiyad Rabu house to Sk Sahabul house |
335442 |
Improvement of Pcc road from Saiyad Rabu house to Sk Sahabul house1 |
Plinth level |
-
latitude : 22.47187703847885,22.471947111189365
Longitude : 87.98214549198747,87.98216351307929
file name : Image_31012021121915413.png
|
2021-01-31 12:19:15.487669 |
16 |
39075113 |
laying distribution system of pipe line construction of valve chamber etc |
255597 |
laying distribution system of pipe line construction of valve chamber etc1 |
Roof laid |
-
latitude : 22.475388846360147,22.47543909586966
Longitude : 87.97780877910554,87.97785152681172
file name : Image_08032021173836769.png
|
2021-03-08 17:38:36.873471 |
17 |
39075113 |
laying distribution system of pipe line construction of valve chamber etc |
255597 |
laying distribution system of pipe line construction of valve chamber etc1 |
Plinth level |
-
latitude : 22.475377027876675,22.47533356770873
Longitude : 87.97783702611923,87.97784314490855
file name : Image_08032021171906700.png
|
2021-03-08 17:19:06.796766 |
18 |
39075113 |
laying distribution system of pipe line construction of valve chamber etc |
255597 |
laying distribution system of pipe line construction of valve chamber etc1 |
Completion of work |
-
latitude : 22.475417805835605,22.475402341224253
Longitude : 87.97783426009119,87.9778541252017
file name : Image_08032021170143389.png
|
2021-03-08 17:01:43.471124 |
19 |
39076448 |
Laying distribution system of pipe line construction of valve chamber etc |
347406 |
Laying distribution system of pipe line construction of valve chamber etc1 |
Roof laid |
-
latitude : 22.47541897930205,22.47541147749871
Longitude : 87.97785496339202,87.97784674912691
file name : Image_08032021173922775.png
|
2021-03-08 17:39:22.870948 |
20 |
39076448 |
Laying distribution system of pipe line construction of valve chamber etc |
347406 |
Laying distribution system of pipe line construction of valve chamber etc1 |
Plinth level |
-
latitude : 22.475369148887694,22.475407454185188
Longitude : 87.97783157788217,87.9778356011957
file name : Image_08032021172022513.png
|
2021-03-08 17:20:22.603107 |
21 |
39076448 |
Laying distribution system of pipe line construction of valve chamber etc |
347406 |
Laying distribution system of pipe line construction of valve chamber etc1 |
Completion of work |
-
latitude : 22.475402341224253,22.475354690104723
Longitude : 87.9778541252017,87.9778266325593
file name : Image_08032021170250053.png
|
2021-03-08 17:02:50.137433 |
22 |
39080867 |
laying distribution system of pipe line construction of valve chamber etc |
260253 |
laying distribution system of pipe line construction of valve chamber etc1 |
Roof laid |
-
latitude : 22.475399700924754,22.475405652076006
Longitude : 87.97786560840905,87.97782571054995
file name : Image_08032021174031629.png
|
2021-03-08 17:40:31.740714 |
23 |
39080867 |
laying distribution system of pipe line construction of valve chamber etc |
260253 |
laying distribution system of pipe line construction of valve chamber etc1 |
Plinth level |
-
latitude : 22.47532518580556,22.475423798896372
Longitude : 87.9779059253633,87.97784993425012
file name : Image_08032021172237717.png
|
2021-03-08 17:22:37.813429 |
24 |
39080867 |
laying distribution system of pipe line construction of valve chamber etc |
260253 |
laying distribution system of pipe line construction of valve chamber etc1 |
Completion of work |
-
latitude : 22.475388469174504,22.475383020937443
Longitude : 87.97781355679035,87.97781833447516
file name : Image_08032021170523608.png
|
2021-03-08 17:05:23.699471 |
25 |
39072806 |
construction of pump house with laying pipe deep tube well |
1600000 |
construction of pump house with laying pipe deep tube well1 |
Roof laid |
-
latitude : 22.47542937286198
Longitude : 87.97782462090254
file name : Image_08032021174132514.png
|
2021-03-08 17:41:32.614646 |
26 |
39072806 |
construction of pump house with laying pipe deep tube well |
1600000 |
construction of pump house with laying pipe deep tube well1 |
Plinth level |
-
latitude : 22.475389265455306
Longitude : 87.9778110422194
file name : Image_08032021172427929.png
|
2021-03-08 17:24:28.040901 |
27 |
39072806 |
construction of pump house with laying pipe deep tube well |
1600000 |
construction of pump house with laying pipe deep tube well1 |
Completion of work |
-
latitude : 22.475389055907726
Longitude : 87.97783467918634
file name : Image_08032021170715995.png
|
2021-03-08 17:07:16.097919 |
28 |
34577240 |
Improvement of Pcc Road From Shibnath Adhikary House to Gopalpur Saner Ghat |
348826 |
Improvement of Pcc Road From Shibnath Adhikary House to Gopalpur Saner Ghat1 |
Completion of work |
-
latitude : 22.475296268239617,22.475263788364828
Longitude : 87.96755980700254,87.96747053973377
file name : Image_31032021113928528.png
|
2021-03-31 11:39:28.627052 |
29 |
34572325 |
Improvement of Pcc road from Amir Ali house to Ganda para |
219112 |
Improvement of Pcc road from Amir Ali house to Ganda para1 |
Completion of work |
-
latitude : 22.47501283418387,22.47501283418387
Longitude : 87.97459431923926,87.97459431923926
file name : Image_31032021115035253.png
|
2021-03-31 11:50:35.354904 |
30 |
34582296 |
Improvement of Pcc road from Monohar Ghatak house to Sunil Hait house |
348980 |
Improvement of Pcc road from Monohar Ghatak house to Sunil Hait house1 |
Completion of work |
-
latitude : 22.47671096585691,22.476742565631866
Longitude : 87.96919654123485,87.96919612213969
file name : Image_31032021113525886.png
|
2021-03-31 11:35:25.993725 |
31 |
34574865 |
Improvement of Pcc road from Mahasin house to Rafik house |
216887 |
Improvement of Pcc road from Mahasin house to Rafik house1 |
Completion of work |
-
latitude : 22.476695459336042,22.47663540299982
Longitude : 87.9734112136066,87.97342705540359
file name : Image_31032021115418338.png
|
2021-03-31 11:54:18.442615 |
32 |
34570632 |
Improvement of Pcc road with Tile pilling from Tapas Das houes to Asto malik house |
349720 |
Improvement of Pcc road with Tile pilling from Tapas Das houes to Asto malik house 1 |
Completion of work |
-
latitude : 22.4710875,22.4710718
Longitude : 87.9712559,87.9714704
file name : Image_31032021115824050.png
|
2021-03-31 11:58:24.162892 |
33 |
34806284 |
Tube Well Materials Wages |
400000 |
Tube Well Materials Wages1 |
Completion of work |
-
latitude : 22.4711058
Longitude : 87.9714632
file name : Image_10062021144217214.png
|
2021-06-10 14:42:17.323176 |
34 |
39081195 |
cons of drain from nadu house to Idga |
400000 |
cons of drain from nadu house to Idga1 |
Roof laid |
-
latitude : 22.471486567519605,22.47156472876668
Longitude : 87.9828036390245,87.98286289907992
file name : Image_03082021153717692.png
|
2021-08-03 15:37:17.789653 |
35 |
39081195 |
cons of drain from nadu house to Idga |
400000 |
cons of drain from nadu house to Idga1 |
Plinth level |
-
latitude : 22.471489291638136,22.47141368687153
Longitude : 87.98280732706189,87.98287505283952
file name : Image_03082021153426876.png
|
2021-08-03 15:34:26.98104 |
36 |
39081195 |
cons of drain from nadu house to Idga |
400000 |
cons of drain from nadu house to Idga1 |
Completion of work |
-
latitude : 22.47838671784848,22.47151414398104
Longitude : 87.97088071703911,87.98275753855705
file name : Image_03082021153110395.png
|
2021-08-03 15:31:10.489896 |
37 |
39081010 |
cons of drain bimal bera house to ujjal manna house |
400000 |
cons of drain bimal bera house to ujjal manna house1 |
Plinth level |
-
latitude : 22.476021721959114,22.476013
Longitude : 87.96580371446908,87.9657599
file name : Image_03082021115232120.png
|
2021-08-03 11:52:32.229051 |
38 |
39081010 |
cons of drain bimal bera house to ujjal manna house |
400000 |
cons of drain bimal bera house to ujjal manna house1 |
Completion of work |
-
latitude : 22.4760134,22.47615935280919
Longitude : 87.9657587,87.96560699120164
file name : Image_30072021104537970.png
|
2021-07-30 10:45:38.074646 |
39 |
39081175 |
cons of drain from saharat house to damodar khal |
106367 |
cons of drain from saharat house to damodar khal1 |
Roof laid |
-
latitude : 22.47734342236072,22.47725943569094
Longitude : 87.97277309931815,87.97267955727875
file name : Image_03112021171643450.png
|
2021-11-03 17:16:43.533912 |
40 |
39081175 |
cons of drain from saharat house to damodar khal |
106367 |
cons of drain from saharat house to damodar khal1 |
Plinth level |
-
latitude : 22.477355785667896,22.477369280532002
Longitude : 87.97274828888476,87.97274929471314
file name : Image_03112021123111924.png
|
2021-11-03 12:31:12.010707 |
41 |
39081175 |
cons of drain from saharat house to damodar khal |
106367 |
cons of drain from saharat house to damodar khal1 |
Completion of work |
-
latitude : 22.477438347414136,22.477369448170066
Longitude : 87.97284317202866,87.97282137908041
file name : Image_01112021121208274.png
|
2021-11-01 12:12:08.442797 |
42 |
39081215 |
cons drain of ranajit dhak house to sanat polly boroz |
102271 |
cons drain of ranajit dhak house to sanat polly boroz1 |
Roof laid |
-
latitude : 22.472501238808036,22.472578352317214
Longitude : 87.98116506077349,87.9812145140022
file name : Image_29102021140355730.png
|
2021-10-29 14:03:55.81735 |
43 |
39081215 |
cons drain of ranajit dhak house to sanat polly boroz |
102271 |
cons drain of ranajit dhak house to sanat polly boroz1 |
Plinth level |
-
latitude : 22.472471399232745,22.47247508727014
Longitude : 87.98114787787199,87.98114536330104
file name : Image_29102021135807309.png
|
2021-10-29 13:58:07.436248 |
44 |
39081215 |
cons drain of ranajit dhak house to sanat polly boroz |
102271 |
cons drain of ranajit dhak house to sanat polly boroz1 |
Completion of work |
-
latitude : 22.47249826323241,22.47281421907246
Longitude : 87.98126438632607,87.9812752828002
file name : Image_28102021184103922.png
|
2021-10-28 18:41:04.033178 |
45 |
47033018 |
Repairing Tube Well |
200000 |
Repairing Tube Well1 |
Completion of work |
-
latitude : 22.4709401
Longitude : 87.9681689
file name : Image_10022022120650093.png
|
2022-02-10 12:06:50.215352 |
46 |
47073166 |
Construction of Boundary wall from Khadinan Purbapara Graveyerd |
297330 |
Construction of Boundary wall from Khadinan Purbapara Graveyerd 1 |
Plinth level |
-
latitude : 22.47187058441341,22.471867902204394
Longitude : 87.97938306815922,87.97941081225872
file name : Image_14032022143833590.png
|
2022-03-14 14:38:33.69375 |
47 |
47073166 |
Construction of Boundary wall from Khadinan Purbapara Graveyerd |
297330 |
Construction of Boundary wall from Khadinan Purbapara Graveyerd 1 |
Completion of work |
-
latitude : 22.471778760664165,22.471808516420424
Longitude : 87.9793880134821,87.97937594354153
file name : Image_08032022133718945.png
|
2022-03-08 13:37:19.085461 |
48 |
47071595 |
Construction of pcc road with tile pilling from Khadinan Mahamaya Sangha to Shumbhu Kapri House |
256026 |
Construction of pcc road with tile pilling from Khadinan Mahamaya Sangha to Shumbhu Kapri House 1 |
Roof laid |
-
latitude : 22.4710659,22.4710469
Longitude : 87.9712538,87.9712466
file name : Image_28032022121205098.png
|
2022-03-28 12:12:05.195213 |
49 |
47071595 |
Construction of pcc road with tile pilling from Khadinan Mahamaya Sangha to Shumbhu Kapri House |
256026 |
Construction of pcc road with tile pilling from Khadinan Mahamaya Sangha to Shumbhu Kapri House 1 |
Roof laid |
-
latitude : 22.4710659,22.4710728
Longitude : 87.9712538,87.971483
file name : Image_28032022120937376.png
|
2022-03-28 12:09:37.475952 |
50 |
47071595 |
Construction of pcc road with tile pilling from Khadinan Mahamaya Sangha to Shumbhu Kapri House |
256026 |
Construction of pcc road with tile pilling from Khadinan Mahamaya Sangha to Shumbhu Kapri House 1 |
Completion of work |
-
latitude : 22.4710525,22.4710647
Longitude : 87.9712528,87.9711874
file name : Image_28032022120510960.png
|
2022-03-28 12:05:11.052132 |
51 |
47011013 |
Construction of Pakka Drain from Swapan Mitra House to Yubo Gosti Club |
348818 |
Construction of Pakka Drain from Swapan Mitra House to Yubo Gosti Club1 |
Roof laid |
-
latitude : 22.475582803599536,22.475427906028926
Longitude : 87.96667266637087,87.96704163774848
file name : Image_28032022125337757.png
|
2022-03-28 12:53:37.891069 |
52 |
47011013 |
Construction of Pakka Drain from Swapan Mitra House to Yubo Gosti Club |
348818 |
Construction of Pakka Drain from Swapan Mitra House to Yubo Gosti Club1 |
Plinth level |
-
latitude : 22.47542727738619,22.47550313360989
Longitude : 87.96707944013178,87.96675623394549
file name : Image_28032022123449972.png
|
2022-03-28 12:34:50.098652 |
53 |
47011013 |
Construction of Pakka Drain from Swapan Mitra House to Yubo Gosti Club |
348818 |
Construction of Pakka Drain from Swapan Mitra House to Yubo Gosti Club1 |
Completion of work |
-
latitude : 22.47539429459721,22.475423337891698
Longitude : 87.9671336710453,87.96721388585865
file name : Image_28032022123013420.png
|
2022-03-28 12:30:13.53079 |
54 |
47074463 |
Construction of pcc road with Groud wall from Chandrapur Darga Tala |
226214 |
Construction of pcc road with Groud wall from Chandrapur Darga Tala1 |
Plinth level |
-
latitude : 22.471544570289552,22.47151393443346
Longitude : 87.98058712854981,87.98046290874481
file name : Image_20072022162140920.png
|
2022-07-20 16:21:41.012909 |
55 |
47074463 |
Construction of pcc road with Groud wall from Chandrapur Darga Tala |
226214 |
Construction of pcc road with Groud wall from Chandrapur Darga Tala1 |
Completion of work |
-
latitude : 22.471533003263175,22.471542097628117
Longitude : 87.98061638139188,87.98065611161292
file name : Image_18072022110539947.png
|
2022-07-18 11:05:40.0477 |
56 |
47074307 |
Construction of pcc road with tile pilling from Manik Maji House to Rabu House |
260794 |
Construction of pcc road with tile pilling from Manik Maji House to Rabu House1 |
Roof laid |
-
latitude : 22.47159020975232,22.471566908061504
Longitude : 87.98156294971704,87.98157518729568
file name : Image_20072022161930941.png
|
2022-07-20 16:19:31.035561 |
57 |
47074307 |
Construction of pcc road with tile pilling from Manik Maji House to Rabu House |
260794 |
Construction of pcc road with tile pilling from Manik Maji House to Rabu House1 |
Plinth level |
-
latitude : 22.47154297772795,22.471858053468168
Longitude : 87.98157460056245,87.9816690646112
file name : Image_18072022110535090.png
|
2022-07-18 11:05:35.186187 |
58 |
47074307 |
Construction of pcc road with tile pilling from Manik Maji House to Rabu House |
260794 |
Construction of pcc road with tile pilling from Manik Maji House to Rabu House1 |
Completion of work |
-
latitude : 22.47104002162814,22.47089262586087
Longitude : 87.98158692196012,87.98145038075745
file name : Image_31032022164010151.png
|
2022-03-31 16:40:10.25458 |
59 |
34799804 |
laying distribution system of pipe line construction of valve chamber etc |
460000 |
laying distribution system of pipe line construction of valve chamber etc1 |
Roof laid |
-
latitude : 22.4710139
Longitude : 87.9711918
file name : Image_30072022115617816.png
|
2022-07-30 11:56:17.926519 |
60 |
34799804 |
laying distribution system of pipe line construction of valve chamber etc |
460000 |
laying distribution system of pipe line construction of valve chamber etc1 |
Plinth level |
-
latitude : 22.4710946
Longitude : 87.9714621
file name : Image_30072022115319293.png
|
2022-07-30 11:53:19.396521 |
61 |
34799804 |
laying distribution system of pipe line construction of valve chamber etc |
460000 |
laying distribution system of pipe line construction of valve chamber etc1 |
Completion of work |
-
latitude : 22.471063
Longitude : 87.9712396
file name : Image_30072022114957642.png
|
2022-07-30 11:49:57.748097 |
62 |
47555483 |
Sinking of new Pump house with booring with laying pipe line at Gopalpur Khadinan |
344046 |
Sinking of new Pump house with booring with laying pipe line at Gopalpur Khadinan1 |
Plinth level |
-
latitude : 22.477985811419785,22.478011376224458
Longitude : 87.96744086779654,87.96748629771173
file name : Image_30082022144835103.png
|
2022-08-30 14:48:35.219179 |
63 |
47555483 |
Sinking of new Pump house with booring with laying pipe line at Gopalpur Khadinan |
344046 |
Sinking of new Pump house with booring with laying pipe line at Gopalpur Khadinan1 |
Completion of work |
-
latitude : 22.475466881878674,22.475436748936772
Longitude : 87.97220757231116,87.97221855260432
file name : Image_08032022134408658.png
|
2022-03-08 13:44:08.783956 |
64 |
47014284 |
Construction of Pakka Drain from Syed Manik House to Hasin House |
65404 |
Construction of Pakka Drain from Syed Manik House to Hasin House1 |
Completion of work |
-
latitude : 22.470365948975086,22.47025157790631
Longitude : 87.98161206766963,87.98158315010369
file name : Image_01092022130135513.png
|
2022-09-01 13:01:35.636007 |
65 |
47033629 |
Repairing and Maintanence of pipe line |
70653 |
Repairing and Maintanence of pipe line 1 |
Plinth level |
-
latitude : 22.469475329853594,22.469460368156433
Longitude : 87.98085392452776,87.98084671609104
file name : Image_01092022125501077.png
|
2022-09-01 12:55:01.230832 |
66 |
47033629 |
Repairing and Maintanence of pipe line |
70653 |
Repairing and Maintanence of pipe line 1 |
Completion of work |
-
latitude : 22.469597957096994,22.46959720272571
Longitude : 87.98091678880155,87.98088979907334
file name : Image_26082022163040246.png
|
2022-08-26 16:30:40.364945 |
67 |
47073057 |
Construction of pcc road from Tapos Mondal House to Biplop Roychoudhury House |
99609 |
Construction of pcc road from Tapos Mondal House to Biplop Roychoudhury House1 |
Plinth level |
-
latitude : 22.47968670912087,22.47964563779533
Longitude : 87.96257165260613,87.9625890031457
file name : Image_23092022114657637.png
|
2022-09-23 11:46:57.781466 |
68 |
47073057 |
Construction of pcc road from Tapos Mondal House to Biplop Roychoudhury House |
99609 |
Construction of pcc road from Tapos Mondal House to Biplop Roychoudhury House1 |
Completion of work |
-
latitude : 22.47960678767413,22.47969257645309
Longitude : 87.9625353589654,87.962447097525
file name : Image_22092022120312764.png
|
2022-09-22 12:03:12.942833 |
69 |
65220391 |
Water Supply to villages |
1100000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.477896460331976
Longitude : 87.96746341511607
file name : Image_26092022125921502.png
|
2022-09-26 12:59:21.624216 |
70 |
65220391 |
Water Supply to villages |
1100000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.47790178284049
Longitude : 87.96748571097851
file name : Image_26092022125646058.png
|
2022-09-26 12:56:46.174539 |
71 |
65220391 |
Water Supply to villages |
1100000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.477887659333646
Longitude : 87.96747623942792
file name : Image_26092022124634066.png
|
2022-09-26 12:46:34.177958 |
72 |
56125140 |
TUBE WELL REPAIRING AND MAINTENANCE AT KHADINAN |
400000 |
TUBE WELL REPAIRING AND MAINTENANCE AT KHADINAN1 |
Plinth level |
-
latitude : 22.477837493643165
Longitude : 87.96985980123281
file name : Image_20022023161326941.png
|
2023-02-20 16:13:27.032866 |
73 |
56125140 |
TUBE WELL REPAIRING AND MAINTENANCE AT KHADINAN |
400000 |
TUBE WELL REPAIRING AND MAINTENANCE AT KHADINAN1 |
Completion of work |
-
latitude : 22.4712037
Longitude : 87.971565
file name : Image_13022023160836609.png
|
2023-02-13 16:08:36.719125 |
74 |
67294751 |
Construction of roads |
400000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.4710675,22.4711473
Longitude : 87.9712333,87.9714756
file name : Image_28122023174419209.png
|
2023-12-28 17:44:19.357726 |
75 |
67294751 |
Construction of roads |
400000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.471072,22.4711247
Longitude : 87.9712348,87.9713455
file name : Image_28122023173935180.png
|
2023-12-28 17:39:35.323837 |
76 |
67294751 |
Construction of roads |
400000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.4710684,22.4711918
Longitude : 87.9712226,87.9713041
file name : Image_28122023173543598.png
|
2023-12-28 17:35:43.771405 |
77 |
56071753 |
OPERATION AND MAINTANANCE OF PUMP HOUSE AT SANSAD V MOUZA GOPALPUR |
400000 |
OPERATION AND MAINTANANCE OF PUMP HOUSE AT SANSAD V MOUZA GOPALPUR1 |
Completion of work |
-
latitude : 22.478038826957345
Longitude : 87.967473808676
file name : Image_22022023130917070.png
|
2023-02-22 13:09:17.174036 |
78 |
56071753 |
OPERATION AND MAINTANANCE OF PUMP HOUSE AT SANSAD V MOUZA GOPALPUR |
400000 |
OPERATION AND MAINTANANCE OF PUMP HOUSE AT SANSAD V MOUZA GOPALPUR1 |
Plinth level |
-
latitude : 22.477998048998415
Longitude : 87.96741580590606
file name : Image_24022023115448582.png
|
2023-02-24 11:54:48.684748 |
79 |
56086049 |
CONSTRUCTION OF PCC ROAD FROM KHADINAN BULET SANGHA TO NH6 VIA FIROJ HASSAN HOPUSE |
240000 |
CONSTRUCTION OF PCC ROAD FROM KHADINAN BULET SANGHA TO NH6 VIA FIROJ HASSAN HOPUSE1 |
Plinth level |
-
latitude : 22.4685655,22.4687025
Longitude : 87.9733033,87.9736964
file name : Image_02032023164218786.png
|
2023-03-02 16:42:18.896897 |
80 |
56086049 |
CONSTRUCTION OF PCC ROAD FROM KHADINAN BULET SANGHA TO NH6 VIA FIROJ HASSAN HOPUSE |
240000 |
CONSTRUCTION OF PCC ROAD FROM KHADINAN BULET SANGHA TO NH6 VIA FIROJ HASSAN HOPUSE1 |
Completion of work |
-
latitude : 22.4683799,22.4684173
Longitude : 87.9731742,87.9727692
file name : Image_02032023163557184.png
|
2023-03-02 16:35:57.278943 |
81 |
66308244 |
Operation & maintenance of community compost pits |
468325 |
Operation & maintenance of community compost pits1 |
Plinth level |
-
latitude : 22.471113614737988
Longitude : 87.99743810668588
file name : Image_16032023133602605.png
|
2023-03-16 13:36:02.691421 |
82 |
66308244 |
Operation & maintenance of community compost pits |
468325 |
Operation & maintenance of community compost pits1 |
Completion of work |
-
latitude : 22.471102634444833
Longitude : 87.99733911640942
file name : Image_16032023132414951.png
|
2023-03-16 13:24:15.04731 |
83 |
66308212 |
Purchase of equipment (including safety equipment) for waste management |
480000 |
Purchase of equipment (including safety equipment) for waste management1 |
Plinth level |
-
latitude : 22.471102634444833
Longitude : 87.99733911640942
file name : Image_16032023133459006.png
|
2023-03-16 13:34:59.106647 |
84 |
66308212 |
Purchase of equipment (including safety equipment) for waste management |
480000 |
Purchase of equipment (including safety equipment) for waste management1 |
Completion of work |
-
latitude : 22.471102634444833
Longitude : 87.99733911640942
file name : Image_16032023132311808.png
|
2023-03-16 13:23:11.916921 |
85 |
47034629 |
Laying pipeline under Gp area |
419000 |
Laying pipeline under Gp area1 |
Plinth level |
-
latitude : 22.470798203721642,22.470779763534665
Longitude : 87.98940748907626,87.98941059038043
file name : Image_14032022144749328.png
|
2022-03-14 14:47:49.43329 |
86 |
47034629 |
Laying pipeline under Gp area |
419000 |
Laying pipeline under Gp area1 |
Roof laid |
-
latitude : 22.470785840414464,22.47085842769593
Longitude : 87.98947957344353,87.9893669206649
file name : Image_14032022145209828.png
|
2022-03-14 14:52:09.929822 |
87 |
47034629 |
Laying pipeline under Gp area |
419000 |
Laying pipeline under Gp area1 |
Completion of work |
-
latitude : 22.4707891093567,22.470793006941676
Longitude : 87.98941813409328,87.98941863700747
file name : Image_08032022133621099.png
|
2022-03-08 13:36:21.233046 |
88 |
47074202 |
Construction of pcc road from Sukumar Patra House to Tantipara Mohoutsab Tala |
132109 |
Construction of pcc road from Sukumar Patra House to Tantipara Mohoutsab Tala1 |
Roof laid |
-
latitude : 22.468125969171524,22.468124460428953
Longitude : 87.99268020316958,87.9926876630634
file name : Image_20072022161009080.png
|
2022-07-20 16:10:09.160308 |
89 |
47074202 |
Construction of pcc road from Sukumar Patra House to Tantipara Mohoutsab Tala |
132109 |
Construction of pcc road from Sukumar Patra House to Tantipara Mohoutsab Tala1 |
Plinth level |
-
latitude : 22.467992613092065,22.467997265048325
Longitude : 87.99269814044237,87.99270367249846
file name : Image_20072022160742574.png
|
2022-07-20 16:07:42.667541 |
90 |
47074202 |
Construction of pcc road from Sukumar Patra House to Tantipara Mohoutsab Tala |
132109 |
Construction of pcc road from Sukumar Patra House to Tantipara Mohoutsab Tala1 |
Completion of work |
-
latitude : 22.467962647788227,22.46798456646502
Longitude : 87.99275999888778,87.99276209436357
file name : Image_20072022160513698.png
|
2022-07-20 16:05:13.783795 |
91 |
47072824 |
Construction of pcc road Tile Pilling from Rajab Ali house to Nasir house via dighi |
284128 |
Construction of pcc road Tile Pilling from Rajab Ali house to Nasir house via dighi1 |
Plinth level |
-
latitude : 22.476466884836555,22.476515248417854
Longitude : 87.97396978363395,87.97386718913913
file name : Image_05072022123234994.png
|
2022-07-05 12:32:35.085677 |
92 |
47072824 |
Construction of pcc road Tile Pilling from Rajab Ali house to Nasir house via dighi |
284128 |
Construction of pcc road Tile Pilling from Rajab Ali house to Nasir house via dighi1 |
Completion of work |
-
latitude : 22.476447061635554,22.476513111032546
Longitude : 87.97406852245331,87.97406944446266
file name : Image_31032022163119122.png
|
2022-03-31 16:31:19.222755 |
93 |
47071792 |
Construction of pcc road from Nabab Mallick house to Sahensha Mallick house via Haro Danga |
200795 |
Construction of pcc road from Nabab Mallick house to Sahensha Mallick house via Haro Danga 1 |
Roof laid |
-
latitude : 22.473754207603633,22.473705089651048
Longitude : 87.97458166256547,87.97476354986429
file name : Image_14032022162625316.png
|
2022-03-14 16:26:25.43381 |
94 |
47071792 |
Construction of pcc road from Nabab Mallick house to Sahensha Mallick house via Haro Danga |
200795 |
Construction of pcc road from Nabab Mallick house to Sahensha Mallick house via Haro Danga 1 |
Completion of work |
-
latitude : 22.473712214268744,22.473742640577257
Longitude : 87.97461342997849,87.97488559037447
file name : Image_14032022141742445.png
|
2022-03-14 14:17:42.552216 |
95 |
47071792 |
Construction of pcc road from Nabab Mallick house to Sahensha Mallick house via Haro Danga |
200795 |
Construction of pcc road from Nabab Mallick house to Sahensha Mallick house via Haro Danga 1 |
Plinth level |
-
latitude : 22.473712633363903,22.473683799616992
Longitude : 87.97514257952571,87.97511173412204
file name : Image_14032022143200691.png
|
2022-03-14 14:32:00.808501 |
96 |
47072919 |
Construction of pcc road from Samar ghosh House to Kanu Mitra house |
259044 |
Construction of pcc road from Samar ghosh House to Kanu Mitra house 1 |
Roof laid |
-
latitude : 22.475661,22.4756599
Longitude : 87.9681671,87.9681666
file name : Image_24022022123355706.png
|
2022-02-24 12:33:55.806527 |
97 |
47072919 |
Construction of pcc road from Samar ghosh House to Kanu Mitra house |
259044 |
Construction of pcc road from Samar ghosh House to Kanu Mitra house 1 |
Plinth level |
-
latitude : 22.4756602,22.475661
Longitude : 87.9681668,87.9681671
file name : Image_24022022122836014.png
|
2022-02-24 12:28:36.118779 |
98 |
47072919 |
Construction of pcc road from Samar ghosh House to Kanu Mitra house |
259044 |
Construction of pcc road from Samar ghosh House to Kanu Mitra house 1 |
Completion of work |
-
latitude : 22.4756615,22.4756605
Longitude : 87.968167,87.9681668
file name : Image_24022022121619316.png
|
2022-02-24 12:16:19.42551 |
99 |
66308179 |
Any other operation and maintenance needs related to solid waste management |
410000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 22.471102634444833
Longitude : 87.99733911640942
file name : Image_16032023133412106.png
|
2023-03-16 13:34:12.204568 |
100 |
66308179 |
Any other operation and maintenance needs related to solid waste management |
410000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 22.470915634185076
Longitude : 87.97122487798333
file name : Image_16032023132211958.png
|
2023-03-16 13:22:12.048822 |
101 |
56071974 |
OPERATION MAINTANANCE OF PUMP HOUSE AT KHADINAN |
500000 |
OPERATION MAINTANANCE OF PUMP HOUSE AT KHADINAN1 |
Plinth level |
-
latitude : 22.476545381359756
Longitude : 87.97403021715581
file name : Image_20032023140308713.png
|
2023-03-20 14:03:08.819699 |
102 |
56071974 |
OPERATION MAINTANANCE OF PUMP HOUSE AT KHADINAN |
500000 |
OPERATION MAINTANANCE OF PUMP HOUSE AT KHADINAN1 |
Completion of work |
-
latitude : 22.476605772972107
Longitude : 87.97400549054146
file name : Image_18032023114348264.png
|
2023-03-18 11:43:48.357702 |
103 |
47008930 |
Construction of Pakka drain From Pradip Barik House to Kanchan chouley House |
345386 |
Construction of Pakka drain From Pradip Barik House to Kanchan chouley House1 |
Roof laid |
-
latitude : 22.469324874691665,22.46937772259116
Longitude : 87.97352277673781,87.97351389192045
file name : Image_28032022122344168.png
|
2022-03-28 12:23:44.271694 |
104 |
47008930 |
Construction of Pakka drain From Pradip Barik House to Kanchan chouley House |
345386 |
Construction of Pakka drain From Pradip Barik House to Kanchan chouley House1 |
Plinth level |
-
latitude : 22.46936770621687,22.4684253
Longitude : 87.9734992235899,87.9740039
file name : Image_28032022122116881.png
|
2022-03-28 12:21:17.014968 |
105 |
47008930 |
Construction of Pakka drain From Pradip Barik House to Kanchan chouley House |
345386 |
Construction of Pakka drain From Pradip Barik House to Kanchan chouley House1 |
Completion of work |
-
latitude : 22.471010056324303,22.469376046210527
Longitude : 87.97117928043008,87.97358086332679
file name : Image_28032022120343933.png
|
2022-03-28 12:03:44.033228 |
106 |
56093225 |
CONSTRUCTION OF PCC ROAD FROM BISWAJIT BERA HOUSE TO AMTA ROAD |
240000 |
CONSTRUCTION OF PCC ROAD FROM BISWAJIT BERA HOUSE TO AMTA ROAD1 |
Plinth level |
-
latitude : 22.47669638134539,22.4767252150923
Longitude : 87.97008477151394,87.96996960416436
file name : Image_16032023152729673.png
|
2023-03-16 15:27:32.697927 |
107 |
56093225 |
CONSTRUCTION OF PCC ROAD FROM BISWAJIT BERA HOUSE TO AMTA ROAD |
240000 |
CONSTRUCTION OF PCC ROAD FROM BISWAJIT BERA HOUSE TO AMTA ROAD1 |
Completion of work |
-
latitude : 22.470942623913288,22.47671603690833
Longitude : 87.97100267373025,87.97007001936436
file name : Image_16032023151850867.png
|
2023-03-16 15:18:50.966831 |
108 |
66308099 |
Water Supply to villages |
300000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.470976151525974
Longitude : 87.99737088382244
file name : Image_27032023124630076.png
|
2023-03-27 12:46:30.240162 |
109 |
66308099 |
Water Supply to villages |
300000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.471234314143658
Longitude : 87.99762359820306
file name : Image_27032023122305456.png
|
2023-03-27 12:23:05.845824 |
110 |
68098016 |
IMP. OF PCC RPAD AT CHANDRAPUR IGDA SANSAD- XI |
345227 |
IMP. OF PCC RPAD AT CHANDRAPUR IGDA SANSAD- XI1 |
Plinth level |
-
latitude : 22.471566488966346,22.471576379612088
Longitude : 87.98292936757207,87.98287614248693
file name : Image_20042023162909901.png
|
2023-04-20 16:29:10.012337 |
111 |
68098016 |
IMP. OF PCC RPAD AT CHANDRAPUR IGDA SANSAD- XI |
345227 |
IMP. OF PCC RPAD AT CHANDRAPUR IGDA SANSAD- XI1 |
Completion of work |
-
latitude : 22.471618582494557,22.47162076178938
Longitude : 87.98292039893568,87.98284940421581
file name : Image_20042023162242608.png
|
2023-04-20 16:22:42.721818 |
112 |
68098016 |
IMP. OF PCC RPAD AT CHANDRAPUR IGDA SANSAD- XI |
345227 |
IMP. OF PCC RPAD AT CHANDRAPUR IGDA SANSAD- XI1 |
Completion of work |
-
latitude : 22.4715904192999,22.471586815081537
Longitude : 87.98289030790329,87.98291101120412
file name : Image_20042023162213294.png
|
2023-04-20 16:22:13.396517 |
113 |
68097362 |
IMP. OF TILE PILLING FROM HARU DHAK HOUSE TO SAYED CHHATU HOUSE WITH PCC ROAD AT CHANDRAPUR DARGA TA |
343920 |
IMP. OF TILE PILLING FROM HARU DHAK HOUSE TO SAYED CHHATU HOUSE WITH PCC ROAD AT CHANDRAPUR DARGA TA1 |
Plinth level |
-
latitude : 22.471455386839807,22.471568123437464
Longitude : 87.98081310465932,87.98254949972034
file name : Image_20042023163925649.png
|
2023-04-20 16:39:25.759271 |
114 |
68097362 |
IMP. OF TILE PILLING FROM HARU DHAK HOUSE TO SAYED CHHATU HOUSE WITH PCC ROAD AT CHANDRAPUR DARGA TA |
343920 |
IMP. OF TILE PILLING FROM HARU DHAK HOUSE TO SAYED CHHATU HOUSE WITH PCC ROAD AT CHANDRAPUR DARGA TA1 |
Completion of work |
-
latitude : 22.471468630246818,22.471523322165012
Longitude : 87.98079608939588,87.98073062673211
file name : Image_20042023163555267.png
|
2023-04-20 16:35:55.36997 |
115 |
68098429 |
IMP. OF PCC RPAD FROM CHANDRAPUR BORO BANDH NEAR NH6 TO CHANDRAPUR SWASAN PART-I SANSAD X |
348911 |
IMP. OF PCC RPAD FROM CHANDRAPUR BORO BANDH NEAR NH6 TO CHANDRAPUR SWASAN PART-I SANSAD X1 |
Plinth level |
-
latitude : 22.4711207812652,22.47111026197672
Longitude : 87.99615425057709,87.99616707488894
file name : Image_31052023144354876.png
|
2023-05-31 14:43:54.951508 |
116 |
68098429 |
IMP. OF PCC RPAD FROM CHANDRAPUR BORO BANDH NEAR NH6 TO CHANDRAPUR SWASAN PART-I SANSAD X |
348911 |
IMP. OF PCC RPAD FROM CHANDRAPUR BORO BANDH NEAR NH6 TO CHANDRAPUR SWASAN PART-I SANSAD X1 |
Completion of work |
-
latitude : 22.471110387705266,22.471167678013444
Longitude : 87.99618601799011,87.99652422778308
file name : Image_31052023143650828.png
|
2023-05-31 14:36:50.918648 |
117 |
68098775 |
IMP. OF PCC ROAD FROM CHANDRAPUR BORO BANDH NEAR NH6 TO CHANDRAPUR SWASAN PHASE -II SANSAD X |
348911 |
IMP. OF PCC ROAD FROM CHANDRAPUR BORO BANDH NEAR NH6 TO CHANDRAPUR SWASAN PHASE -II SANSAD X1 |
Plinth level |
-
latitude : 22.47115741018206,22.471194751560688
Longitude : 87.99653604626656,87.99663361161947
file name : Image_31052023144510888.png
|
2023-05-31 14:45:10.976304 |
118 |
68098775 |
IMP. OF PCC ROAD FROM CHANDRAPUR BORO BANDH NEAR NH6 TO CHANDRAPUR SWASAN PHASE -II SANSAD X |
348911 |
IMP. OF PCC ROAD FROM CHANDRAPUR BORO BANDH NEAR NH6 TO CHANDRAPUR SWASAN PHASE -II SANSAD X1 |
Completion of work |
-
latitude : 22.471162816509604,22.471129917539656
Longitude : 87.99654199741781,87.99658918753266
file name : Image_31052023143744913.png
|
2023-05-31 14:37:45.003416 |
119 |
68686915 |
Creation of drainage channel for management of grey water |
275227 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.475918
Longitude : 87.9677102
file name : Image_09062023124129979.png
|
2023-06-09 12:41:30.080253 |
120 |
68686915 |
Creation of drainage channel for management of grey water |
275227 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.475377027876675
Longitude : 87.96728228218853
file name : Image_09062023123356896.png
|
2023-06-09 12:33:57.029473 |
121 |
57813148 |
CONSTRUCTION OF COVER DRAIN FROM SK ALO HOUSE TO SK MABUD HOUAE |
202000 |
CONSTRUCTION OF COVER DRAIN FROM SK ALO HOUSE TO SK MABUD HOUAE1 |
Plinth level |
-
latitude : 22.4777877
Longitude : 87.9722678
file name : Image_10082023165614790.png
|
2023-08-10 16:56:14.885059 |
122 |
57813148 |
CONSTRUCTION OF COVER DRAIN FROM SK ALO HOUSE TO SK MABUD HOUAE |
202000 |
CONSTRUCTION OF COVER DRAIN FROM SK ALO HOUSE TO SK MABUD HOUAE1 |
Completion of work |
-
latitude : 22.4777879
Longitude : 87.9722666
file name : Image_09082023151740293.png
|
2023-08-09 15:17:41.126854 |
123 |
68691350 |
Creation of drainage channel for management of grey water |
323350 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.47179590165615
Longitude : 87.97935591079295
file name : Image_17072023144555890.png
|
2023-07-17 14:46:06.883047 |
124 |
68691350 |
Creation of drainage channel for management of grey water |
323350 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.4714635
Longitude : 87.9791863
file name : Image_17072023143725131.png
|
2023-07-17 14:37:25.23207 |
125 |
67303063 |
Creation of Shed for segregation and processing of wet and dry waste |
400000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
|
-
latitude : 22.474881866946816
Longitude : 87.97510812990367
file name : Image_18012024155541111.png
|
2024-01-18 15:55:41.21338 |
126 |
67304605 |
Creation of a new source of drinking water |
700000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.47792810201645
Longitude : 87.96753717586398
file name : Image_25042024123025969.png
|
2024-04-25 12:30:26.053965 |
127 |
67304605 |
Creation of a new source of drinking water |
700000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.4716604501009
Longitude : 87.97155981883407
file name : Image_17112023163357271.png
|
2023-11-17 16:33:57.417468 |
128 |
67304605 |
Creation of a new source of drinking water |
700000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.4714677
Longitude : 87.9712877
file name : Image_17112023162249838.png
|
2023-11-17 16:22:49.92936 |
129 |
67311601 |
Installation of Solar lights |
200000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 22.4711471
Longitude : 87.9714753
file name : Image_17112023163113399.png
|
2023-11-17 16:31:13.501554 |
130 |
67311601 |
Installation of Solar lights |
200000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 22.470994172617793
Longitude : 87.97133141197264
file name : Image_17112023162804559.png
|
2023-11-17 16:28:04.695331 |
131 |
67301786 |
Computer in GP Bhawan |
200000 |
Computer in GP Bhawan1 |
Plinth level |
-
latitude : 22.4699239
Longitude : 87.9722218
file name : Image_21112023125248318.png
|
2023-11-21 12:52:48.405348 |
132 |
67301786 |
Computer in GP Bhawan |
200000 |
Computer in GP Bhawan1 |
Completion of work |
-
latitude : 22.4711443
Longitude : 87.9713101
file name : Image_21112023124837766.png
|
2023-11-21 12:48:37.86055 |
133 |
67302906 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.476514410227537
Longitude : 87.96489377506077
file name : Image_04122023163007036.png
|
2023-12-04 16:30:07.128994 |
134 |
67302906 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.476576352491975
Longitude : 87.96493023633957
file name : Image_26112023161701049.png
|
2023-11-26 16:17:01.127478 |
135 |
67302906 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.476564114913344
Longitude : 87.96497616916895
file name : Image_23112023155551191.png
|
2023-11-23 15:55:51.285124 |
136 |
67302663 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.4702935
Longitude : 87.9700926
file name : Image_23112023134233490.png
|
2023-11-23 13:42:33.579427 |
137 |
67302663 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.4702891
Longitude : 87.9700944
file name : Image_23112023133848921.png
|
2023-11-23 13:38:49.007118 |
138 |
67302663 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.470299187116325
Longitude : 87.97010312788188
file name : Image_23112023133456686.png
|
2023-11-23 13:34:56.769874 |
139 |
67299598 |
Construction of roads |
400000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.47709452174604,22.4769098
Longitude : 87.96823580749333,87.9690889
file name : Image_26112023161211813.png
|
2023-11-26 16:12:11.902412 |
140 |
67299598 |
Construction of roads |
400000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.477094982750714,22.477066065184772
Longitude : 87.96831543557346,87.9682576842606
file name : Image_26112023160736552.png
|
2023-11-26 16:07:36.631512 |
141 |
94661700 |
Construction of roads |
349076 |
Construction of roads1 |
Roof laid |
-
latitude : 22.46779840439558,22.46780762448907
Longitude : 87.99211165867746,87.99218449741602
file name : Image_26042024155832521.png
|
2024-04-26 15:58:32.600754 |
142 |
94661700 |
Construction of roads |
349076 |
Construction of roads1 |
Plinth level |
-
latitude : 22.467778329737484,22.467682021670043
Longitude : 87.99222959205508,87.99179658293724
file name : Image_26042024155051570.png
|
2024-04-26 15:50:51.651226 |
143 |
94661700 |
Construction of roads |
349076 |
Construction of roads1 |
Completion of work |
-
latitude : 22.46781785041094,22.46760042384267
Longitude : 87.9922198690474,87.99140573479235
file name : Image_25042024121252057.png
|
2024-04-25 12:12:52.150535 |
144 |
94591792 |
Construction of roads |
250000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.46813288424164,22.4681842
Longitude : 87.98083255067468,87.9802392
file name : Image_26042024162031032.png
|
2024-04-26 16:20:31.115357 |
145 |
94591792 |
Construction of roads |
250000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.468132046051323,22.46818531304598
Longitude : 87.98080715350807,87.98065611161292
file name : Image_26042024161348706.png
|
2024-04-26 16:13:48.799944 |
146 |
94591792 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.468144074082375,22.4681875
Longitude : 87.98082576133311,87.9802374
file name : Image_26042024160759306.png
|
2024-04-26 16:07:59.388585 |
147 |
67299813 |
Construction of roads |
400000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.471519634127617,22.4718802
Longitude : 87.98164207488298,87.9822381
file name : Image_09052024154301137.png
|
2024-05-09 15:43:01.316943 |
148 |
67299813 |
Construction of roads |
400000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.47155915480107,22.4718802
Longitude : 87.98173134215176,87.9822381
file name : Image_09052024153508921.png
|
2024-05-09 15:35:09.01142 |
149 |
67299813 |
Construction of roads |
400000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.47167549561709,22.4718835
Longitude : 87.98166990280151,87.9822363
file name : Image_09052024151546220.png
|
2024-05-09 15:15:46.320336 |
150 |
95796302 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.469142065383494
Longitude : 87.99475103616714
file name : Image_13052024160107773.png
|
2024-05-13 16:01:07.8623 |
151 |
95796302 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.469158242456615
Longitude : 87.9947324283421
file name : Image_13052024155650597.png
|
2024-05-13 15:56:50.679696 |
152 |
95796302 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.468985533341765
Longitude : 87.99476503394544
file name : Image_13052024154719865.png
|
2024-05-13 15:47:19.952207 |
153 |
67302597 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.477336297743022
Longitude : 87.97410749830306
file name : Image_15032024170329101.png
|
2024-03-15 17:03:29.201067 |
154 |
67302597 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.47728089336306
Longitude : 87.97412342391908
file name : Image_15032024165858353.png
|
2024-03-15 16:58:58.468509 |
155 |
67302597 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.477270080707967
Longitude : 87.97415426932275
file name : Image_15032024165545965.png
|
2024-03-15 16:55:46.058979 |
156 |
95786976 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.4696756
Longitude : 87.9705181
file name : Image_28052024165340427.png
|
2024-05-28 16:53:40.523881 |
157 |
95786976 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.470019022002816
Longitude : 87.97083780169487
file name : Image_28052024165040200.png
|
2024-05-28 16:50:40.297829 |
158 |
95786976 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.469974011182785
Longitude : 87.97103234566748
file name : Image_28052024164413514.png
|
2024-05-28 16:44:13.613 |
159 |
96976979 |
Water Supply to villages |
1400000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.4689012
Longitude : 87.9809189
file name : Image_10062024173504228.png
|
2024-06-10 17:35:04.335061 |
160 |
96976979 |
Water Supply to villages |
1400000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.4689253
Longitude : 87.9809723
file name : Image_10062024173034887.png
|
2024-06-10 17:30:34.983335 |
161 |
96976979 |
Water Supply to villages |
1400000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.4689112
Longitude : 87.980944
file name : Image_10062024172243006.png
|
2024-06-10 17:22:43.107736 |