1 |
34487946 |
Repairing of tubewell at GP area |
1500000 |
Repairing of tubewell at GP area1 |
Roof laid |
-
latitude : 22.528076651506126
Longitude : 87.8937176708132
file name : Image_09082021171300602.png
|
2021-08-09 17:13:00.691125 |
2 |
34487946 |
Repairing of tubewell at GP area |
1500000 |
Repairing of tubewell at GP area1 |
Plinth level |
-
latitude : 22.528067557141185
Longitude : 87.89376301690936
file name : Image_09082021170802088.png
|
2021-08-09 17:08:02.179138 |
3 |
34487946 |
Repairing of tubewell at GP area |
1500000 |
Repairing of tubewell at GP area1 |
Completion of work |
-
latitude : 22.52807317301631
Longitude : 87.89378304965794
file name : Image_18062021171100053.png
|
2021-06-18 17:11:00.136631 |
4 |
67375875 |
Water Supply to villages |
175000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.517353682778776
Longitude : 87.90302912704647
file name : Image_02022024160230915.png
|
2024-02-02 16:02:31.013296 |
5 |
67375875 |
Water Supply to villages |
175000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.517366046085954
Longitude : 87.90291639044881
file name : Image_02022024155549387.png
|
2024-02-02 15:55:49.508879 |
6 |
67375875 |
Water Supply to villages |
175000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.517340816557407
Longitude : 87.90299819782376
file name : Image_02022024154733190.png
|
2024-02-02 15:47:33.283222 |
7 |
47570127 |
REPAIRING OF TUBEWELL AT GP AREA |
1800000 |
REPAIRING OF TUBEWELL AT GP AREA1 |
Completion of work |
-
latitude : 22.515897201374173
Longitude : 87.90394585579634
file name : Image_07032022150914068.png
|
2022-03-07 15:09:14.151078 |
8 |
47515645 |
Construction of drain from Deulgram Chandrapara ICDS center to Dutta pukurpar |
250000 |
Construction of drain from Deulgram Chandrapara ICDS center to Dutta pukurpar1 |
Plinth level |
-
latitude : 22.512747826986015,22.512776660732925
Longitude : 87.90344101376832,87.903411090374
file name : Image_28032022162048301.png
|
2022-03-28 16:20:48.39589 |
9 |
47515645 |
Construction of drain from Deulgram Chandrapara ICDS center to Dutta pukurpar |
250000 |
Construction of drain from Deulgram Chandrapara ICDS center to Dutta pukurpar1 |
Completion of work |
-
latitude : 22.512768739834428,22.51274506095797
Longitude : 87.90339223109186,87.90337915532291
file name : Image_25032022165654179.png
|
2022-03-25 16:56:54.294722 |
10 |
47519493 |
Extension of pipeline for drinking water from Kotai Dhali para to Kansra via Sonayara and Koriyara |
350000 |
Extension of pipeline for drinking water from Kotai Dhali para to Kansra via Sonayara and Koriyara1 |
Plinth level |
-
latitude : 22.5261949,22.5261976
Longitude : 87.9074773,87.9075015
file name : Image_28032022161114668.png
|
2022-03-28 16:11:14.756002 |
11 |
47519493 |
Extension of pipeline for drinking water from Kotai Dhali para to Kansra via Sonayara and Koriyara |
350000 |
Extension of pipeline for drinking water from Kotai Dhali para to Kansra via Sonayara and Koriyara1 |
Completion of work |
-
latitude : 22.5262606,22.526242
Longitude : 87.9074674,87.9074665
file name : Image_25032022164002813.png
|
2022-03-25 16:40:02.922831 |
12 |
47519583 |
Tubewell water drinking testing |
50000 |
Tubewell water drinking testing1 |
Completion of work |
-
latitude : 22.5218978
Longitude : 87.9041608
file name : Image_25052022171353515.png
|
2022-05-25 17:13:53.601211 |
13 |
47569284 |
REPAIRING OF STREET LIGHT AT GP AREA |
400000 |
REPAIRING OF STREET LIGHT AT GP AREA1 |
Roof laid |
-
latitude : 22.51714493148029
Longitude : 87.90321487002075
file name : Image_11072022141738979.png
|
2022-07-11 14:17:39.07826 |
14 |
47569284 |
REPAIRING OF STREET LIGHT AT GP AREA |
400000 |
REPAIRING OF STREET LIGHT AT GP AREA1 |
Plinth level |
-
latitude : 22.517142458818853
Longitude : 87.9032343160361
file name : Image_11072022141337938.png
|
2022-07-11 14:13:38.053387 |
15 |
47569284 |
REPAIRING OF STREET LIGHT AT GP AREA |
400000 |
REPAIRING OF STREET LIGHT AT GP AREA1 |
Completion of work |
-
latitude : 22.517192624509335
Longitude : 87.90319601073861
file name : Image_11072022141107731.png
|
2022-07-11 14:11:07.835986 |
16 |
39054419 |
Renovatio of DMB High school |
338500 |
Renovatio of DMB High school 1 |
Roof laid |
-
latitude : 22.519518183544278
Longitude : 87.90315326303244
file name : Image_13012021143205466.png
|
2021-01-13 14:32:05.55561 |
17 |
39054419 |
Renovatio of DMB High school |
338500 |
Renovatio of DMB High school 1 |
Plinth level |
-
latitude : 22.5197406
Longitude : 87.90335
file name : Image_13012021141124256.png
|
2021-01-13 14:11:24.335297 |
18 |
39054419 |
Renovatio of DMB High school |
338500 |
Renovatio of DMB High school 1 |
Completion of work |
-
latitude : 22.519544335082173
Longitude : 87.90306458249688
file name : Image_11012021155059003.png
|
2021-01-11 15:50:59.127593 |
19 |
34383993 |
Construction of Chilampur Market shed at Chilampur |
350000 |
Construction of Chilampur Market shed at Chilampur1 |
Roof laid |
-
latitude : 22.517064004205167
Longitude : 87.9091265425086
file name : Image_01022021145107165.png
|
2021-02-01 14:51:07.262669 |
20 |
34383993 |
Construction of Chilampur Market shed at Chilampur |
350000 |
Construction of Chilampur Market shed at Chilampur1 |
Plinth level |
-
latitude : 22.517115720547736
Longitude : 87.90908656083047
file name : Image_18012021092644833.png
|
2021-01-18 09:26:44.956439 |
21 |
34383993 |
Construction of Chilampur Market shed at Chilampur |
350000 |
Construction of Chilampur Market shed at Chilampur1 |
Completion of work |
-
latitude : 22.517081229016185
Longitude : 87.90910474956036
file name : Image_17122020140446841.png
|
2020-12-17 14:04:46.916481 |
22 |
34559684 |
Renovation of common service center at Deygram Dhatri para |
250795 |
Renovation of common service center at Deygram Dhatri para1 |
Roof laid |
-
latitude : 22.510580183006823
Longitude : 87.89578867144883
file name : Image_26112020144715400.png
|
2020-11-26 14:47:15.484663 |
23 |
34559684 |
Renovation of common service center at Deygram Dhatri para |
250795 |
Renovation of common service center at Deygram Dhatri para1 |
Plinth level |
-
latitude : 22.510625696741045
Longitude : 87.89583058096468
file name : Image_26112020143727851.png
|
2020-11-26 14:37:27.944185 |
24 |
34559684 |
Renovation of common service center at Deygram Dhatri para |
250795 |
Renovation of common service center at Deygram Dhatri para1 |
Completion of work |
-
latitude : 22.51057494431734
Longitude : 87.89578473195434
file name : Image_26112020125828484.png
|
2020-11-26 12:58:28.595341 |
25 |
34379337 |
Renovatio of DMB High school |
250000 |
Renovatio of DMB High school 1 |
Roof laid |
-
latitude : 22.5199218
Longitude : 87.9029099
file name : Image_13012021141845141.png
|
2021-01-13 14:18:45.228442 |
26 |
34379337 |
Renovatio of DMB High school |
250000 |
Renovatio of DMB High school 1 |
Plinth level |
-
latitude : 22.51951826736331
Longitude : 87.90321612730622
file name : Image_13012021141119885.png
|
2021-01-13 14:11:19.958307 |
27 |
34379337 |
Renovatio of DMB High school |
250000 |
Renovatio of DMB High school 1 |
Completion of work |
-
latitude : 22.5199204
Longitude : 87.9029096
file name : Image_11012021154926123.png
|
2021-01-11 15:49:26.247901 |
28 |
34435542 |
Installation of street light at Mankur x sansad area |
150000 |
Installation of street light at Mankur x sansad area1 |
Roof laid |
-
latitude : 22.51995291095227
Longitude : 87.90087816305459
file name : Image_19022021143839832.png
|
2021-02-19 14:38:39.927854 |
29 |
34435542 |
Installation of street light at Mankur x sansad area |
150000 |
Installation of street light at Mankur x sansad area1 |
Plinth level |
-
latitude : 22.52007260452956
Longitude : 87.90083047002554
file name : Image_18022021154144145.png
|
2021-02-18 15:41:44.249908 |
30 |
34435542 |
Installation of street light at Mankur x sansad area |
150000 |
Installation of street light at Mankur x sansad area1 |
Completion of work |
-
latitude : 22.5200584391132
Longitude : 87.90079819969833
file name : Image_15022021144249144.png
|
2021-02-15 14:42:49.248988 |
31 |
34435842 |
Installation of street light at sansad no XIV |
150000 |
Installation of street light at sansad no XIV1 |
Roof laid |
-
latitude : 22.51159447710961
Longitude : 87.90236905217171
file name : Image_19022021143239598.png
|
2021-02-19 14:32:39.71561 |
32 |
34435842 |
Installation of street light at sansad no XIV |
150000 |
Installation of street light at sansad no XIV1 |
Plinth level |
-
latitude : 22.511682487092912
Longitude : 87.90227727033198
file name : Image_18022021153608588.png
|
2021-02-18 15:36:08.698574 |
33 |
34435842 |
Installation of street light at sansad no XIV |
150000 |
Installation of street light at sansad no XIV1 |
Completion of work |
-
latitude : 22.511593513190746
Longitude : 87.90235379710793
file name : Image_15022021143439023.png
|
2021-02-15 14:34:39.118802 |
34 |
34435733 |
Installation of street light at sansad no XI |
150000 |
Installation of street light at sansad no XI1 |
Roof laid |
-
latitude : 22.51960812136531
Longitude : 87.9037528205663
file name : Image_19022021141926387.png
|
2021-02-19 14:19:26.494686 |
35 |
34435733 |
Installation of street light at sansad no XI |
150000 |
Installation of street light at sansad no XI1 |
Plinth level |
-
latitude : 22.51959739252925
Longitude : 87.90377779863775
file name : Image_18022021153935697.png
|
2021-02-18 15:39:35.812848 |
36 |
34435733 |
Installation of street light at sansad no XI |
150000 |
Installation of street light at sansad no XI1 |
Completion of work |
-
latitude : 22.5197609
Longitude : 87.9031716
file name : Image_15022021143843703.png
|
2021-02-15 14:38:43.812944 |
37 |
34331561 |
Extension of pipeline for drinking wate at Kajiberia Burnning Ghat to Kajiberia Pry schoo |
350000 |
Extension of pipeline for drinking wate at Kajiberia Burnning Ghat to Kajiberia Pry schoo1 |
Roof laid |
-
latitude : 22.5313222,22.5313222
Longitude : 87.9081648,87.9081648
file name : Image_19022021151213149.png
|
2021-02-19 15:12:13.258507 |
38 |
34331561 |
Extension of pipeline for drinking wate at Kajiberia Burnning Ghat to Kajiberia Pry schoo |
350000 |
Extension of pipeline for drinking wate at Kajiberia Burnning Ghat to Kajiberia Pry schoo1 |
Plinth level |
-
latitude : 22.52986405044794,22.529847412370145
Longitude : 87.90756692178547,87.90756432339549
file name : Image_17022021123255366.png
|
2021-02-17 12:32:55.467514 |
39 |
34331561 |
Extension of pipeline for drinking wate at Kajiberia Burnning Ghat to Kajiberia Pry schoo |
350000 |
Extension of pipeline for drinking wate at Kajiberia Burnning Ghat to Kajiberia Pry schoo1 |
Completion of work |
-
latitude : 22.52984108403325,22.529819584451616
Longitude : 87.90728864260018,87.90730255655944
file name : Image_17122020144416735.png
|
2020-12-17 14:44:16.831816 |
40 |
34331731 |
Extension of pipeline for drinking water from Kajiberia Meherun Nesha house to Kamaluddin house |
350000 |
Extension of pipeline for drinking water from Kajiberia Meherun Nesha house to Kamaluddin house1 |
Roof laid |
-
latitude : 22.52971979789436,22.529719839803874
Longitude : 87.90804636664689,87.90804603137076
file name : Image_08032021170027376.png
|
2021-03-08 17:00:27.492894 |
41 |
34331731 |
Extension of pipeline for drinking water from Kajiberia Meherun Nesha house to Kamaluddin house |
350000 |
Extension of pipeline for drinking water from Kajiberia Meherun Nesha house to Kamaluddin house1 |
Roof laid |
-
latitude : 22.529753241688013,22.529748464003205
Longitude : 87.90805122815073,87.9080421756953
file name : Image_08032021170034458.png
|
2021-03-08 17:00:34.572787 |
42 |
34331731 |
Extension of pipeline for drinking water from Kajiberia Meherun Nesha house to Kamaluddin house |
350000 |
Extension of pipeline for drinking water from Kajiberia Meherun Nesha house to Kamaluddin house1 |
Plinth level |
-
latitude : 22.527795690111816,22.527795690111816
Longitude : 87.90787470526993,87.90787470526993
file name : Image_27022021125416186.png
|
2021-02-27 12:54:16.293094 |
43 |
34331731 |
Extension of pipeline for drinking water from Kajiberia Meherun Nesha house to Kamaluddin house |
350000 |
Extension of pipeline for drinking water from Kajiberia Meherun Nesha house to Kamaluddin house1 |
Completion of work |
-
latitude : 22.529613096266985,22.529613096266985
Longitude : 87.90802876465023,87.90802876465023
file name : Image_19022021151527075.png
|
2021-02-19 15:15:27.1683 |
44 |
47519213 |
Extension of pipeline for drinking water from Bakshi Kalipada Manna hou to Madan Das hou |
97000 |
Extension of pipeline for drinking water from Bakshi Kalipada Manna hou to Madan Das hou1 |
Roof laid |
-
latitude : 22.535084299743176,22.5349044
Longitude : 87.91437361389399,87.9136186
file name : Image_20022023151129563.png
|
2023-02-20 15:11:29.661726 |
45 |
47519213 |
Extension of pipeline for drinking water from Bakshi Kalipada Manna hou to Madan Das hou |
97000 |
Extension of pipeline for drinking water from Bakshi Kalipada Manna hou to Madan Das hou1 |
Plinth level |
-
latitude : 22.535078935325146,22.5349044
Longitude : 87.91448928415775,87.9136186
file name : Image_20022023150531904.png
|
2023-02-20 15:05:31.996835 |
46 |
47519213 |
Extension of pipeline for drinking water from Bakshi Kalipada Manna hou to Madan Das hou |
97000 |
Extension of pipeline for drinking water from Bakshi Kalipada Manna hou to Madan Das hou1 |
Completion of work |
-
latitude : 22.5346024,22.5346024
Longitude : 87.9136397,87.9136397
file name : Image_20022023150008198.png
|
2023-02-20 15:00:08.31296 |
47 |
47519162 |
Extension of pipeline for drinking water from Bakshi Pratap Mahata hou to Sahadeb Mahata hou |
95000 |
Extension of pipeline for drinking water from Bakshi Pratap Mahata hou to Sahadeb Mahata hou1 |
Roof laid |
-
latitude : 22.532286923378706,22.532286923378706
Longitude : 87.91338044218719,87.91338044218719
file name : Image_20022023152407148.png
|
2023-02-20 15:24:07.256283 |
48 |
47519162 |
Extension of pipeline for drinking water from Bakshi Pratap Mahata hou to Sahadeb Mahata hou |
95000 |
Extension of pipeline for drinking water from Bakshi Pratap Mahata hou to Sahadeb Mahata hou1 |
Plinth level |
-
latitude : 22.532279128208756,22.532286923378706
Longitude : 87.91336032561958,87.91338044218719
file name : Image_20022023152045286.png
|
2023-02-20 15:20:45.378564 |
49 |
47519162 |
Extension of pipeline for drinking water from Bakshi Pratap Mahata hou to Sahadeb Mahata hou |
95000 |
Extension of pipeline for drinking water from Bakshi Pratap Mahata hou to Sahadeb Mahata hou1 |
Completion of work |
-
latitude : 22.532295305281878,22.532355738803744
Longitude : 87.91325538419187,87.9132089484483
file name : Image_20022023151806398.png
|
2023-02-20 15:18:06.48921 |
50 |
34432607 |
Renovation of road from Chilampur Somnath Bera to Uttam Manna hous |
190000 |
Renovation of road from Chilampur Somnath Bera to Uttam Manna hous1 |
Roof laid |
-
latitude : 22.516793897375464,22.516797333955765
Longitude : 87.90822657756507,87.9082097299397
file name : Image_28062021141139568.png
|
2021-06-28 14:11:39.653956 |
51 |
34432607 |
Renovation of road from Chilampur Somnath Bera to Uttam Manna hous |
190000 |
Renovation of road from Chilampur Somnath Bera to Uttam Manna hous1 |
Plinth level |
-
latitude : 22.51673497259617,22.51675953157246
Longitude : 87.90821702219546,87.90820067748427
file name : Image_10062021142140042.png
|
2021-06-10 14:21:40.135277 |
52 |
34432607 |
Renovation of road from Chilampur Somnath Bera to Uttam Manna hous |
190000 |
Renovation of road from Chilampur Somnath Bera to Uttam Manna hous1 |
Completion of work |
-
latitude : 22.51672424376011,22.516805715858936
Longitude : 87.9082409106195,87.90820486843586
file name : Image_10062021140847165.png
|
2021-06-10 14:08:47.273412 |
53 |
34552015 |
Reconstruction of Commen service center at chilampur |
316249 |
Reconstruction of Commen service center at chilampur1 |
Roof laid |
-
latitude : 22.519417055882514
Longitude : 87.91056755930185
file name : Image_26112021145131725.png
|
2021-11-26 14:51:31.876451 |
54 |
34552015 |
Reconstruction of Commen service center at chilampur |
316249 |
Reconstruction of Commen service center at chilampur1 |
Plinth level |
-
latitude : 22.51935255713761
Longitude : 87.91046597063541
file name : Image_23112021151305481.png
|
2021-11-23 15:13:05.581141 |
55 |
34552015 |
Reconstruction of Commen service center at chilampur |
316249 |
Reconstruction of Commen service center at chilampur1 |
Completion of work |
-
latitude : 22.51928193960339
Longitude : 87.91061793453991
file name : Image_18112021143536813.png
|
2021-11-18 14:35:36.936243 |
56 |
34386923 |
Renovation of road from Malia PMGSY road to Ranja house |
293818 |
Renovation of road from Malia PMGSY road to Ranja house1 |
Roof laid |
-
latitude : 22.527859644033015,22.527849921025336
Longitude : 87.91426104493439,87.91428686119616
file name : Image_23112021150107428.png
|
2021-11-23 15:01:07.510286 |
57 |
34386923 |
Renovation of road from Malia PMGSY road to Ranja house |
293818 |
Renovation of road from Malia PMGSY road to Ranja house1 |
Roof laid |
-
latitude : 22.52789208199829,22.527843550778925
Longitude : 87.91425853036344,87.91427194140851
file name : Image_23112021150100950.png
|
2021-11-23 15:01:01.024658 |
58 |
34386923 |
Renovation of road from Malia PMGSY road to Ranja house |
293818 |
Renovation of road from Malia PMGSY road to Ranja house1 |
Plinth level |
-
latitude : 22.527871797792614,22.527920035645366
Longitude : 87.91427076794207,87.9142861906439
file name : Image_23112021145503977.png
|
2021-11-23 14:55:04.085468 |
59 |
34386923 |
Renovation of road from Malia PMGSY road to Ranja house |
293818 |
Renovation of road from Malia PMGSY road to Ranja house1 |
Completion of work |
-
latitude : 22.527894009836018,22.527931896038353
Longitude : 87.91427604854107,87.9142848495394
file name : Image_18112021135548939.png
|
2021-11-18 13:55:49.071652 |
60 |
34389678 |
Renovation of PCC road from Khanra Boxipara towards Khanra IdGa |
152563 |
Renovation of PCC road from Khanra Boxipara towards Khanra IdGa1 |
Roof laid |
-
latitude : 22.523305504582822,22.523300643078983
Longitude : 87.91416901163757,87.91417420841753
file name : Image_18112021141712163.png
|
2021-11-18 14:17:12.252311 |
61 |
34389678 |
Renovation of PCC road from Khanra Boxipara towards Khanra IdGa |
152563 |
Renovation of PCC road from Khanra Boxipara towards Khanra IdGa1 |
Plinth level |
-
latitude : 22.52341530751437,22.523403405211866
Longitude : 87.91425760835409,87.91429189033806
file name : Image_18112021141320249.png
|
2021-11-18 14:13:20.349423 |
62 |
34389678 |
Renovation of PCC road from Khanra Boxipara towards Khanra IdGa |
152563 |
Renovation of PCC road from Khanra Boxipara towards Khanra IdGa1 |
Completion of work |
-
latitude : 22.523477459326386,22.523477459326386
Longitude : 87.91433430276811,87.91433430276811
file name : Image_18112021140352729.png
|
2021-11-18 14:03:52.82555 |
63 |
34433008 |
Renovation of PCC road from Deulgram Asgar house to sk Motleb Ali house |
198121 |
Renovation of PCC road from Deulgram Asgar house to sk Motleb Ali house1 |
Roof laid |
-
latitude : 22.5175267,22.5175267
Longitude : 87.9049062,87.9049062
file name : Image_18112021144806791.png
|
2021-11-18 14:48:06.91543 |
64 |
34433008 |
Renovation of PCC road from Deulgram Asgar house to sk Motleb Ali house |
198121 |
Renovation of PCC road from Deulgram Asgar house to sk Motleb Ali house1 |
Plinth level |
-
latitude : 22.51723880879581,22.5175266
Longitude : 87.90542400442064,87.9049051
file name : Image_18112021144512143.png
|
2021-11-18 14:45:12.266931 |
65 |
34433008 |
Renovation of PCC road from Deulgram Asgar house to sk Motleb Ali house |
198121 |
Renovation of PCC road from Deulgram Asgar house to sk Motleb Ali house1 |
Completion of work |
-
latitude : 22.517344797961414,22.5175266
Longitude : 87.90551679208875,87.9049051
file name : Image_18112021144044158.png
|
2021-11-18 14:40:44.270266 |
66 |
34558642 |
Construction of common cervice center at Mankur Chhatu Sen house |
156028 |
Construction of common cervice center at Mankur Chhatu Sen house1 |
Roof laid |
-
latitude : 22.5156202
Longitude : 87.8994295
file name : Image_18112021150908315.png
|
2021-11-18 15:09:08.406068 |
67 |
34558642 |
Construction of common cervice center at Mankur Chhatu Sen house |
156028 |
Construction of common cervice center at Mankur Chhatu Sen house1 |
Plinth level |
-
latitude : 22.5156195
Longitude : 87.8994294
file name : Image_18112021150606604.png
|
2021-11-18 15:06:06.710349 |
68 |
34558642 |
Construction of common cervice center at Mankur Chhatu Sen house |
156028 |
Construction of common cervice center at Mankur Chhatu Sen house1 |
Completion of work |
-
latitude : 22.515619
Longitude : 87.899429
file name : Image_18112021150040462.png
|
2021-11-18 15:00:40.559647 |
69 |
34548027 |
Construction of Jatri Pathikhalay building at Uttar Malia near Abdul Gighi |
319792 |
Construction of Jatri Pathikhalay building at Uttar Malia near Abdul Gighi1 |
Roof laid |
-
latitude : 22.5313688
Longitude : 87.9081588
file name : Image_22122021154658223.png
|
2021-12-22 15:46:58.377201 |
70 |
34548027 |
Construction of Jatri Pathikhalay building at Uttar Malia near Abdul Gighi |
319792 |
Construction of Jatri Pathikhalay building at Uttar Malia near Abdul Gighi1 |
Plinth level |
-
latitude : 22.5313642
Longitude : 87.9081621
file name : Image_21122021155003419.png
|
2021-12-21 15:50:03.541403 |
71 |
34548027 |
Construction of Jatri Pathikhalay building at Uttar Malia near Abdul Gighi |
319792 |
Construction of Jatri Pathikhalay building at Uttar Malia near Abdul Gighi1 |
Completion of work |
-
latitude : 22.5313696
Longitude : 87.9081673
file name : Image_18112021134113601.png
|
2021-11-18 13:41:13.743048 |
72 |
39054904 |
Common sevice center at Kajiberia Sasan |
350000 |
Common sevice center at Kajiberia Sasan1 |
Roof laid |
-
latitude : 22.523752595297992
Longitude : 87.90657291188836
file name : Image_22122021153941365.png
|
2021-12-22 15:39:41.499069 |
73 |
39054904 |
Common sevice center at Kajiberia Sasan |
350000 |
Common sevice center at Kajiberia Sasan1 |
Plinth level |
-
latitude : 22.52367380540818
Longitude : 87.9063824750483
file name : Image_21122021154520650.png
|
2021-12-21 15:45:20.76403 |
74 |
39054904 |
Common sevice center at Kajiberia Sasan |
350000 |
Common sevice center at Kajiberia Sasan1 |
Completion of work |
-
latitude : 22.523596147075295
Longitude : 87.90639789775014
file name : Image_18112021160201300.png
|
2021-11-18 16:02:01.39807 |
75 |
34483696 |
Extrantion of pipe line of water at sansad XVI sansad |
150000 |
Extrantion of pipe line of water at sansad XVI sansad1 |
Roof laid |
-
latitude : 22.514165500178933,22.5141585431993
Longitude : 87.90128418244421,87.90131259709597
file name : Image_12082021151052442.png
|
2021-08-12 15:10:52.538614 |
76 |
34483696 |
Extrantion of pipe line of water at sansad XVI sansad |
150000 |
Extrantion of pipe line of water at sansad XVI sansad1 |
Roof laid |
-
latitude : 22.514153975062072,22.51418930478394
Longitude : 87.90129440836608,87.90125819854438
file name : Image_12082021151056645.png
|
2021-08-12 15:10:56.735512 |
77 |
34483696 |
Extrantion of pipe line of water at sansad XVI sansad |
150000 |
Extrantion of pipe line of water at sansad XVI sansad1 |
Plinth level |
-
latitude : 22.514106198213995,22.514119022525847
Longitude : 87.90126104839146,87.90124420076609
file name : Image_09082021164649184.png
|
2021-08-09 16:46:49.284687 |
78 |
34483696 |
Extrantion of pipe line of water at sansad XVI sansad |
150000 |
Extrantion of pipe line of water at sansad XVI sansad1 |
Completion of work |
-
latitude : 22.51413092482835,22.51413142774254
Longitude : 87.90129960514605,87.90128393098712
file name : Image_06072021161438954.png
|
2021-07-06 16:14:39.097937 |
79 |
34387679 |
Extension of pipeline for drinking water at Bakshi Maity para |
250000 |
Extension of pipeline for drinking water at Bakshi Maity para1 |
Roof laid |
-
latitude : 22.526792837306857,22.526770792901516
Longitude : 87.89777526631951,87.89779454469681
file name : Image_09082021165515046.png
|
2021-08-09 16:55:15.17943 |
80 |
34387679 |
Extension of pipeline for drinking water at Bakshi Maity para |
250000 |
Extension of pipeline for drinking water at Bakshi Maity para1 |
Plinth level |
-
latitude : 22.5272327,22.5272327
Longitude : 87.8981969,87.8981969
file name : Image_03082021163850597.png
|
2021-08-03 16:38:50.703608 |
81 |
34387679 |
Extension of pipeline for drinking water at Bakshi Maity para |
250000 |
Extension of pipeline for drinking water at Bakshi Maity para1 |
Completion of work |
-
latitude : 22.526733702979982,22.52673361916095
Longitude : 87.89778532460332,87.89778616279364
file name : Image_06072021154034455.png
|
2021-07-06 15:40:34.580649 |
82 |
34386238 |
Extension of pipeline for drinking water from Bakshi PCC road to Bakshi Mondal Para |
250000 |
Extension of pipeline for drinking water from Bakshi PCC road to Bakshi Mondal Para1 |
Roof laid |
-
latitude : 22.52549485769123,22.525518033653498
Longitude : 87.8973182849586,87.89728777483106
file name : Image_09082021165842683.png
|
2021-08-09 16:58:42.800029 |
83 |
34386238 |
Extension of pipeline for drinking water from Bakshi PCC road to Bakshi Mondal Para |
250000 |
Extension of pipeline for drinking water from Bakshi PCC road to Bakshi Mondal Para1 |
Plinth level |
-
latitude : 22.525539114139974,22.525509148836136
Longitude : 87.89735541678965,87.89727771654725
file name : Image_03082021164404077.png
|
2021-08-03 16:44:04.212447 |
84 |
34386238 |
Extension of pipeline for drinking water from Bakshi PCC road to Bakshi Mondal Para |
250000 |
Extension of pipeline for drinking water from Bakshi PCC road to Bakshi Mondal Para1 |
Completion of work |
-
latitude : 22.525532534345984,22.5257312
Longitude : 87.89731208235025,87.8969709
file name : Image_06072021154411827.png
|
2021-07-06 15:44:11.945647 |
85 |
34326985 |
Extension of pipeline for drinking water from Bakshi cenema Hall to Taly field |
250000 |
Extension of pipeline for drinking water from Bakshi cenema Hall to Taly field1 |
Roof laid |
-
latitude : 22.526548001915216,22.526363893412054
Longitude : 87.8925312962383,87.89249315857887
file name : Image_03082021170010477.png
|
2021-08-03 17:00:10.628507 |
86 |
34326985 |
Extension of pipeline for drinking water from Bakshi cenema Hall to Taly field |
250000 |
Extension of pipeline for drinking water from Bakshi cenema Hall to Taly field1 |
Plinth level |
-
latitude : 22.52655453979969,22.52655395306647
Longitude : 87.89255468174815,87.89255484938622
file name : Image_03082021165144338.png
|
2021-08-03 16:51:44.443235 |
87 |
34326985 |
Extension of pipeline for drinking water from Bakshi cenema Hall to Taly field |
250000 |
Extension of pipeline for drinking water from Bakshi cenema Hall to Taly field1 |
Completion of work |
-
latitude : 22.526613464578986,22.5267698
Longitude : 87.8925870358944,87.8926945
file name : Image_06072021155243012.png
|
2021-07-06 15:52:43.155208 |
88 |
34326758 |
Extension of pipeline for drinking water from Bakshi Laibery to Parial para |
250000 |
Extension of pipeline for drinking water from Bakshi Laibery to Parial para1 |
Roof laid |
-
latitude : 22.52677146345377,22.5267699
Longitude : 87.89257764816284,87.8926953
file name : Image_03082021170144552.png
|
2021-08-03 17:01:44.689087 |
89 |
34326758 |
Extension of pipeline for drinking water from Bakshi Laibery to Parial para |
250000 |
Extension of pipeline for drinking water from Bakshi Laibery to Parial para1 |
Plinth level |
-
latitude : 22.5267699,22.5267698
Longitude : 87.8926953,87.8926944
file name : Image_03082021164951680.png
|
2021-08-03 16:49:51.785997 |
90 |
34326758 |
Extension of pipeline for drinking water from Bakshi Laibery to Parial para |
250000 |
Extension of pipeline for drinking water from Bakshi Laibery to Parial para1 |
Completion of work |
-
latitude : 22.526728799566627,22.5267698
Longitude : 87.89258074946702,87.8926955
file name : Image_06072021154933796.png
|
2021-07-06 15:49:33.914813 |
91 |
39050241 |
Consrtuction of drain with cover at Deulgram from Balai Pal shop to Kamini pond |
250000 |
Consrtuction of drain with cover at Deulgram from Balai Pal shop to Kamini pond 1 |
Roof laid |
-
latitude : 22.5145879,22.514502285048366
Longitude : 87.9061489,87.90675438009202
file name : Image_22122021161235748.png
|
2021-12-22 16:12:35.848263 |
92 |
39050241 |
Consrtuction of drain with cover at Deulgram from Balai Pal shop to Kamini pond |
250000 |
Consrtuction of drain with cover at Deulgram from Balai Pal shop to Kamini pond 1 |
Plinth level |
-
latitude : 22.51448049210012,22.5145883
Longitude : 87.90672848001122,87.9061532
file name : Image_21122021162206045.png
|
2021-12-21 16:22:06.138094 |
93 |
39050241 |
Consrtuction of drain with cover at Deulgram from Balai Pal shop to Kamini pond |
250000 |
Consrtuction of drain with cover at Deulgram from Balai Pal shop to Kamini pond 1 |
Completion of work |
-
latitude : 22.5145884,22.514436235651374
Longitude : 87.9061676,87.90672680363059
file name : Image_14122021140947489.png
|
2021-12-14 14:09:47.574826 |
94 |
39050451 |
Const of drain with cover from Kajiberia Moslem house to Rabin Samanta shop |
300000 |
Const of drain with cover from Kajiberia Moslem house to Rabin Samanta shop1 |
Roof laid |
-
latitude : 22.52331401221454,22.5233334582299
Longitude : 87.90518159978092,87.90508126839995
file name : Image_11012022150240845.png
|
2022-01-11 15:02:40.940318 |
95 |
39050451 |
Const of drain with cover from Kajiberia Moslem house to Rabin Samanta shop |
300000 |
Const of drain with cover from Kajiberia Moslem house to Rabin Samanta shop1 |
Plinth level |
-
latitude : 22.5219917,22.5219957
Longitude : 87.9049234,87.9049206
file name : Image_11012022145308731.png
|
2022-01-11 14:53:08.883234 |
96 |
39050451 |
Const of drain with cover from Kajiberia Moslem house to Rabin Samanta shop |
300000 |
Const of drain with cover from Kajiberia Moslem house to Rabin Samanta shop1 |
Completion of work |
-
latitude : 22.5219957,22.522247373126447
Longitude : 87.9049206,87.90489661507308
file name : Image_11012022144856080.png
|
2022-01-11 14:48:56.209823 |
97 |
55356772 |
Construction of drain with cover from Mankur DMB more towards Chilampur sasan |
350000 |
Construction of drain with cover from Mankur DMB more towards Chilampur sasan1 |
Roof laid |
-
latitude : 22.51931370701641,22.519274982623756
Longitude : 87.90415766648948,87.90415565483272
file name : Image_11012022152216244.png
|
2022-01-11 15:22:16.354992 |
98 |
55356772 |
Construction of drain with cover from Mankur DMB more towards Chilampur sasan |
350000 |
Construction of drain with cover from Mankur DMB more towards Chilampur sasan1 |
Plinth level |
-
latitude : 22.51934061292559,22.519274353981018
Longitude : 87.90410628542304,87.90416386909783
file name : Image_11012022151636560.png
|
2022-01-11 15:16:36.656724 |
99 |
55356772 |
Construction of drain with cover from Mankur DMB more towards Chilampur sasan |
350000 |
Construction of drain with cover from Mankur DMB more towards Chilampur sasan1 |
Completion of work |
-
latitude : 22.519285124726593,22.51932623796165
Longitude : 87.90414383634925,87.90410997346044
file name : Image_11012022150806987.png
|
2022-01-11 15:08:07.088071 |
100 |
55356855 |
Construction of community Toilet at Mankur PHC Rural hospital |
300000 |
Construction of community Toilet at Mankur PHC Rural hospital1 |
Roof laid |
-
latitude : 22.5118066649884
Longitude : 87.901093326509
file name : Image_02022022152202912.png
|
2022-02-02 15:22:03.009528 |
101 |
55356855 |
Construction of community Toilet at Mankur PHC Rural hospital |
300000 |
Construction of community Toilet at Mankur PHC Rural hospital1 |
Plinth level |
-
latitude : 22.51171215903014
Longitude : 87.90118309669197
file name : Image_02022022151822768.png
|
2022-02-02 15:18:22.883031 |
102 |
55356855 |
Construction of community Toilet at Mankur PHC Rural hospital |
300000 |
Construction of community Toilet at Mankur PHC Rural hospital1 |
Completion of work |
-
latitude : 22.511712703853846
Longitude : 87.90113054215908
file name : Image_02022022151028665.png
|
2022-02-02 15:10:28.75904 |
103 |
55356411 |
Construction of drain with cover from Mankur Kohinoor furniture shop towards Bose para sasan |
350000 |
Construction of drain with cover from Mankur Kohinoor furniture shop towards Bose para sasan1 |
Roof laid |
-
latitude : 22.516033994033933,22.515989234670997
Longitude : 87.90243082679808,87.90243811905384
file name : Image_02022022150449006.png
|
2022-02-02 15:04:49.099811 |
104 |
55356411 |
Construction of drain with cover from Mankur Kohinoor furniture shop towards Bose para sasan |
350000 |
Construction of drain with cover from Mankur Kohinoor furniture shop towards Bose para sasan1 |
Plinth level |
-
latitude : 22.51621156465262,22.516240566037595
Longitude : 87.90244054980576,87.90238883346319
file name : Image_02022022150202478.png
|
2022-02-02 15:02:02.575822 |
105 |
55356411 |
Construction of drain with cover from Mankur Kohinoor furniture shop towards Bose para sasan |
350000 |
Construction of drain with cover from Mankur Kohinoor furniture shop towards Bose para sasan1 |
Completion of work |
-
latitude : 22.516016643494368,22.516016643494368
Longitude : 87.90244926698506,87.90244926698506
file name : Image_02022022145905670.png
|
2022-02-02 14:59:05.789187 |
106 |
55356556 |
Construction of drain with cover from Chilampur Mozaffar Ali land towards Alauddin land |
350000 |
Construction of drain with cover from Chilampur Mozaffar Ali land towards Alauddin land1 |
Roof laid |
-
latitude : 22.52100178040564,22.520970348268747
Longitude : 87.90870971046388,87.90872764773667
file name : Image_07022022153337768.png
|
2022-02-07 15:33:37.860761 |
107 |
55356556 |
Construction of drain with cover from Chilampur Mozaffar Ali land towards Alauddin land |
350000 |
Construction of drain with cover from Chilampur Mozaffar Ali land towards Alauddin land1 |
Plinth level |
-
latitude : 22.520657954737544,22.52064839936793
Longitude : 87.9087676294148,87.90875145234168
file name : Image_02022022153659026.png
|
2022-02-02 15:36:59.151679 |
108 |
55356556 |
Construction of drain with cover from Chilampur Mozaffar Ali land towards Alauddin land |
350000 |
Construction of drain with cover from Chilampur Mozaffar Ali land towards Alauddin land1 |
Completion of work |
-
latitude : 22.52080924808979,22.52083879429847
Longitude : 87.90872739627957,87.90872680954635
file name : Image_02022022153206988.png
|
2022-02-02 15:32:07.218027 |
109 |
55357243 |
Construction of Community Toilet at Mankur Park |
300000 |
Construction of Community Toilet at Mankur Park1 |
Roof laid |
-
latitude : 22.514174971729517
Longitude : 87.89799747057259
file name : Image_08032022173732622.png
|
2022-03-08 17:37:32.723139 |
110 |
55357243 |
Construction of Community Toilet at Mankur Park |
300000 |
Construction of Community Toilet at Mankur Park1 |
Plinth level |
-
latitude : 22.51427014824003
Longitude : 87.89797232486308
file name : Image_08032022173549897.png
|
2022-03-08 17:35:50.010188 |
111 |
55357243 |
Construction of Community Toilet at Mankur Park |
300000 |
Construction of Community Toilet at Mankur Park1 |
Completion of work |
-
latitude : 22.514283978380263
Longitude : 87.89798263460398
file name : Image_08032022173312795.png
|
2022-03-08 17:33:12.909717 |
112 |
55357190 |
Construction of Community Toilet at Chilampur |
275000 |
Construction of Community Toilet at Chilampur1 |
Roof laid |
-
latitude : 22.520085177384317
Longitude : 87.91074483655393
file name : Image_14112022140416776.png
|
2022-11-14 14:04:16.862907 |
113 |
55357190 |
Construction of Community Toilet at Chilampur |
275000 |
Construction of Community Toilet at Chilampur1 |
Roof laid |
-
latitude : 22.52013077493757
Longitude : 87.91077216155827
file name : Image_22032022152517139.png
|
2022-03-22 15:25:17.242075 |
114 |
55357190 |
Construction of Community Toilet at Chilampur |
275000 |
Construction of Community Toilet at Chilampur1 |
Plinth level |
-
latitude : 22.520136600360274
Longitude : 87.9107225406915
file name : Image_16032022154942592.png
|
2022-03-16 15:49:42.724518 |
115 |
55357190 |
Construction of Community Toilet at Chilampur |
275000 |
Construction of Community Toilet at Chilampur1 |
Completion of work |
-
latitude : 22.520056595094502
Longitude : 87.91069974191487
file name : Image_16032022154446359.png
|
2022-03-16 15:44:46.479074 |
116 |
55357125 |
Construction of Community Toilet at Malia |
300000 |
Construction of Community Toilet at Malia1 |
Roof laid |
-
latitude : 22.528210929594934
Longitude : 87.91373482905328
file name : Image_16032022160702757.png
|
2022-03-16 16:07:02.892607 |
117 |
55357125 |
Construction of Community Toilet at Malia |
300000 |
Construction of Community Toilet at Malia1 |
Plinth level |
-
latitude : 22.52825317438692
Longitude : 87.91370063088834
file name : Image_16032022160132355.png
|
2022-03-16 16:01:32.4467 |
118 |
55357125 |
Construction of Community Toilet at Malia |
300000 |
Construction of Community Toilet at Malia1 |
Completion of work |
-
latitude : 22.528174510225654
Longitude : 87.91366542689502
file name : Image_16032022155722485.png
|
2022-03-16 15:57:22.630754 |
119 |
55357045 |
Construction of Community Toilet at Kansrakotai |
300000 |
Construction of Community Toilet at Kansrakotai1 |
Roof laid |
-
latitude : 22.529396046884358
Longitude : 87.90050198324025
file name : Image_14112022142944561.png
|
2022-11-14 14:29:44.655114 |
120 |
55357045 |
Construction of Community Toilet at Kansrakotai |
300000 |
Construction of Community Toilet at Kansrakotai1 |
Roof laid |
-
latitude : 22.529459916986525
Longitude : 87.90046124719083
file name : Image_16032022162713639.png
|
2022-03-16 16:27:13.744647 |
121 |
55357045 |
Construction of Community Toilet at Kansrakotai |
300000 |
Construction of Community Toilet at Kansrakotai1 |
Plinth level |
-
latitude : 22.529389592818916
Longitude : 87.90052386000752
file name : Image_16032022162149926.png
|
2022-03-16 16:21:50.033211 |
122 |
55357045 |
Construction of Community Toilet at Kansrakotai |
300000 |
Construction of Community Toilet at Kansrakotai1 |
Completion of work |
-
latitude : 22.529378151521087
Longitude : 87.90042738430202
file name : Image_16032022161802992.png
|
2022-03-16 16:18:03.095219 |
123 |
55356981 |
Construction of Community Toilet at Kazeberia Agricultural Co Operative Society |
275000 |
Construction of Community Toilet at Kazeberia Agricultural Co Operative Society1 |
Roof laid |
-
latitude : 22.522645
Longitude : 87.9041558
file name : Image_05112022132635258.png
|
2022-11-05 13:26:35.37409 |
124 |
55356981 |
Construction of Community Toilet at Kazeberia Agricultural Co Operative Society |
275000 |
Construction of Community Toilet at Kazeberia Agricultural Co Operative Society1 |
Plinth level |
-
latitude : 22.5226865
Longitude : 87.9042606
file name : Image_28032022160434738.png
|
2022-03-28 16:04:34.838844 |
125 |
55356981 |
Construction of Community Toilet at Kazeberia Agricultural Co Operative Society |
275000 |
Construction of Community Toilet at Kazeberia Agricultural Co Operative Society1 |
Completion of work |
-
latitude : 22.522663
Longitude : 87.9041526
file name : Image_16032022163334005.png
|
2022-03-16 16:33:34.128062 |
126 |
47568214 |
INSTALATION OF STREET LIGHT SANSAD II AREA |
300000 |
INSTALATION OF STREET LIGHT SANSAD II AREA1 |
Roof laid |
-
latitude : 22.523686713539064
Longitude : 87.90627124719322
file name : Image_08032022170559733.png
|
2022-03-08 17:05:59.807228 |
127 |
47568214 |
INSTALATION OF STREET LIGHT SANSAD II AREA |
300000 |
INSTALATION OF STREET LIGHT SANSAD II AREA1 |
Plinth level |
-
latitude : 22.523584286682308
Longitude : 87.90624677203596
file name : Image_08032022170340958.png
|
2022-03-08 17:03:41.02546 |
128 |
47568214 |
INSTALATION OF STREET LIGHT SANSAD II AREA |
300000 |
INSTALATION OF STREET LIGHT SANSAD II AREA1 |
Completion of work |
-
latitude : 22.525770203210413
Longitude : 87.90495604276657
file name : Image_08032022165953123.png
|
2022-03-08 16:59:53.25319 |
129 |
47518953 |
Extension of pipeline for drinking water from Uttar Malia Rekha shop to Sk Shaid Ali hou |
350000 |
Extension of pipeline for drinking water from Uttar Malia Rekha shop to Sk Shaid Ali hou1 |
Plinth level |
-
latitude : 22.5349498,22.535411319695413
Longitude : 87.9133894,87.91348588652909
file name : Image_28042022165408631.png
|
2022-04-28 16:54:08.745105 |
130 |
47518953 |
Extension of pipeline for drinking water from Uttar Malia Rekha shop to Sk Shaid Ali hou |
350000 |
Extension of pipeline for drinking water from Uttar Malia Rekha shop to Sk Shaid Ali hou1 |
Completion of work |
-
latitude : 22.5349501,22.525307731702924
Longitude : 87.9133896,87.90458363480866
file name : Image_28042022164817855.png
|
2022-04-28 16:48:17.957661 |
131 |
47518807 |
Extension of pipeline for drinkingwater from Deulgram Shitalatala to Gopi Chandra hou |
350000 |
Extension of pipeline for drinkingwater from Deulgram Shitalatala to Gopi Chandra hou1 |
Roof laid |
-
latitude : 22.51393252518028,22.513909013941884
Longitude : 87.90813471190631,87.90804293006659
file name : Image_24052022151640600.png
|
2022-05-24 15:16:40.702715 |
132 |
47518807 |
Extension of pipeline for drinkingwater from Deulgram Shitalatala to Gopi Chandra hou |
350000 |
Extension of pipeline for drinkingwater from Deulgram Shitalatala to Gopi Chandra hou1 |
Plinth level |
-
latitude : 22.513940487988293,22.513886424712837
Longitude : 87.908152397722,87.9081957321614
file name : Image_24052022151339882.png
|
2022-05-24 15:13:39.977362 |
133 |
47518807 |
Extension of pipeline for drinkingwater from Deulgram Shitalatala to Gopi Chandra hou |
350000 |
Extension of pipeline for drinkingwater from Deulgram Shitalatala to Gopi Chandra hou1 |
Completion of work |
-
latitude : 22.51392037142068,22.513892794959247
Longitude : 87.90813446044922,87.90820302441716
file name : Image_24052022151028387.png
|
2022-05-24 15:10:28.478711 |
134 |
47518911 |
Extension of pipeline for drinking water from Deulgram Gan Chandra hou to Beno Mahji hou |
350000 |
Extension of pipeline for drinking water from Deulgram Gan Chandra hou to Beno Mahji hou1 |
Roof laid |
-
latitude : 22.51375537365675,22.51374992541969
Longitude : 87.90311680175364,87.9031671769917
file name : Image_24052022150519864.png
|
2022-05-24 15:05:19.954128 |
135 |
47518911 |
Extension of pipeline for drinking water from Deulgram Gan Chandra hou to Beno Mahji hou |
350000 |
Extension of pipeline for drinking water from Deulgram Gan Chandra hou to Beno Mahji hou1 |
Plinth level |
-
latitude : 22.513821716420352,22.513720337301493
Longitude : 87.90316675789654,87.9031325597316
file name : Image_24052022150120962.png
|
2022-05-24 15:01:21.065819 |
136 |
47518911 |
Extension of pipeline for drinking water from Deulgram Gan Chandra hou to Beno Mahji hou |
350000 |
Extension of pipeline for drinking water from Deulgram Gan Chandra hou to Beno Mahji hou1 |
Completion of work |
-
latitude : 22.513855202123523,22.513774652034044
Longitude : 87.90318427607417,87.90317195467651
file name : Image_24052022145652913.png
|
2022-05-24 14:56:53.040278 |
137 |
47519538 |
Extension of pipeline for drinking water at Sansad XV area |
150000 |
Extension of pipeline for drinking water at Sansad XV area1 |
Roof laid |
-
latitude : 22.513067009858787,22.513083815574646
Longitude : 87.90025295689702,87.90021398104727
file name : Image_30062022154459244.png
|
2022-06-30 15:44:59.357649 |
138 |
47519538 |
Extension of pipeline for drinking water at Sansad XV area |
150000 |
Extension of pipeline for drinking water at Sansad XV area1 |
Plinth level |
-
latitude : 22.5130482763052,22.513042576611042
Longitude : 87.90038195438683,87.90046124719083
file name : Image_30062022154108641.png
|
2022-06-30 15:41:08.755076 |
139 |
47519538 |
Extension of pipeline for drinking water at Sansad XV area |
150000 |
Extension of pipeline for drinking water at Sansad XV area1 |
Completion of work |
-
latitude : 22.51307283528149,22.513078493066132
Longitude : 87.90021054446697,87.90021146647632
file name : Image_30062022152600966.png
|
2022-06-30 15:26:01.072083 |
140 |
47519404 |
Extension of pipeline for drinking water from Mankur Ramkrishna Panja house to Rupali Santra hou |
200000 |
Extension of pipeline for drinking water from Mankur Ramkrishna Panja house to Rupali Santra hou1 |
Roof laid |
-
latitude : 22.519059902988374,22.518987357616425
Longitude : 87.9035215638578,87.90357068181038
file name : Image_30062022155707958.png
|
2022-06-30 15:57:08.09018 |
141 |
47519404 |
Extension of pipeline for drinking water from Mankur Ramkrishna Panja house to Rupali Santra hou |
200000 |
Extension of pipeline for drinking water from Mankur Ramkrishna Panja house to Rupali Santra hou1 |
Plinth level |
-
latitude : 22.51903211697936,22.51900894101709
Longitude : 87.90320883505046,87.90313180536032
file name : Image_30062022155343893.png
|
2022-06-30 15:53:44.025007 |
142 |
47519404 |
Extension of pipeline for drinking water from Mankur Ramkrishna Panja house to Rupali Santra hou |
200000 |
Extension of pipeline for drinking water from Mankur Ramkrishna Panja house to Rupali Santra hou1 |
Completion of work |
-
latitude : 22.51903676893562,22.519002654589713
Longitude : 87.90358040481806,87.9035004414618
file name : Image_30062022154947562.png
|
2022-06-30 15:49:47.675231 |
143 |
34561011 |
Construction of Pukur Ghat at Deulgram Mayar Pukur |
126950 |
Construction of Pukur Ghat at Deulgram Mayar Pukur1 |
Roof laid |
-
latitude : 22.513967603445053
Longitude : 87.9081333708018
file name : Image_24052022152223755.png
|
2022-05-24 15:22:23.855409 |
144 |
34561011 |
Construction of Pukur Ghat at Deulgram Mayar Pukur |
126950 |
Construction of Pukur Ghat at Deulgram Mayar Pukur1 |
Plinth level |
-
latitude : 22.51401366200298
Longitude : 87.90809816680849
file name : Image_28042022171957618.png
|
2022-04-28 17:19:57.706016 |
145 |
34561011 |
Construction of Pukur Ghat at Deulgram Mayar Pukur |
126950 |
Construction of Pukur Ghat at Deulgram Mayar Pukur1 |
Completion of work |
-
latitude : 22.514020074158907
Longitude : 87.9081851709634
file name : Image_28042022171533665.png
|
2022-04-28 17:15:33.781996 |
146 |
47565571 |
CONSTRUCTION OF ROAD FROM KAJIBERIA PRY SCHOOL TO KAJIBERIA SASAN |
166096 |
CONSTRUCTION OF ROAD FROM KAJIBERIA PRY SCHOOL TO KAJIBERIA SASAN1 |
Roof laid |
-
latitude : 22.523596691899,22.52360268495977
Longitude : 87.90619790554047,87.90619991719723
file name : Image_24082022135535662.png
|
2022-08-24 13:55:35.762306 |
147 |
47565571 |
CONSTRUCTION OF ROAD FROM KAJIBERIA PRY SCHOOL TO KAJIBERIA SASAN |
166096 |
CONSTRUCTION OF ROAD FROM KAJIBERIA PRY SCHOOL TO KAJIBERIA SASAN1 |
Plinth level |
-
latitude : 22.523514633066952,22.5236088456586
Longitude : 87.90624015033245,87.90615767240524
file name : Image_24082022135326920.png
|
2022-08-24 13:53:27.020388 |
148 |
47565571 |
CONSTRUCTION OF ROAD FROM KAJIBERIA PRY SCHOOL TO KAJIBERIA SASAN |
166096 |
CONSTRUCTION OF ROAD FROM KAJIBERIA PRY SCHOOL TO KAJIBERIA SASAN1 |
Completion of work |
-
latitude : 22.523558512330055,22.52351970411837
Longitude : 87.90623151697218,87.90626621805131
file name : Image_24082022135043401.png
|
2022-08-24 13:50:43.509872 |
149 |
47567379 |
CONST OF ROAD FROM MANKUR MANSATALA TO PATRA PARA VIA SHYAMAL HOU |
150000 |
CONST OF ROAD FROM MANKUR MANSATALA TO PATRA PARA VIA SHYAMAL HOU1 |
Roof laid |
-
latitude : 22.513084863312542,22.513001170009375
Longitude : 87.90030852891505,87.90026837959886
file name : Image_24082022134415499.png
|
2022-08-24 13:44:15.608123 |
150 |
47567379 |
CONST OF ROAD FROM MANKUR MANSATALA TO PATRA PARA VIA SHYAMAL HOU |
150000 |
CONST OF ROAD FROM MANKUR MANSATALA TO PATRA PARA VIA SHYAMAL HOU1 |
Plinth level |
-
latitude : 22.51304370816797,22.51306131016463
Longitude : 87.90022504515946,87.9002227820456
file name : Image_24082022133935801.png
|
2022-08-24 13:39:35.89329 |
151 |
47567379 |
CONST OF ROAD FROM MANKUR MANSATALA TO PATRA PARA VIA SHYAMAL HOU |
150000 |
CONST OF ROAD FROM MANKUR MANSATALA TO PATRA PARA VIA SHYAMAL HOU1 |
Completion of work |
-
latitude : 22.51310451887548,22.513027656823397
Longitude : 87.9001503624022,87.90020417422056
file name : Image_24082022133607086.png
|
2022-08-24 13:36:07.178687 |
152 |
47519307 |
Extension of pipeline for drinking water from Khanra Mondal para to Mallick para |
327500 |
Extension of pipeline for drinking water from Khanra Mondal para to Mallick para1 |
Roof laid |
-
latitude : 22.52368097193539,22.523746015504003
Longitude : 87.91179777123034,87.91184772737324
file name : Image_05092022140115985.png
|
2022-09-05 14:01:16.086674 |
153 |
47519307 |
Extension of pipeline for drinking water from Khanra Mondal para to Mallick para |
327500 |
Extension of pipeline for drinking water from Khanra Mondal para to Mallick para1 |
Plinth level |
-
latitude : 22.523694005794823,22.5236883899197
Longitude : 87.91184647008777,87.91184135712683
file name : Image_05092022135721501.png
|
2022-09-05 13:57:21.642596 |
154 |
47519307 |
Extension of pipeline for drinking water from Khanra Mondal para to Mallick para |
327500 |
Extension of pipeline for drinking water from Khanra Mondal para to Mallick para1 |
Completion of work |
-
latitude : 22.523707835935056,22.523703770712018
Longitude : 87.91183741763234,87.91185745038092
file name : Image_05092022135441253.png
|
2022-09-05 13:54:41.374601 |
155 |
47518993 |
Extension of pipeline for drinking water from South Malia Gulmapara to Paiker para |
327500 |
Extension of pipeline for drinking water from South Malia Gulmapara to Paiker para1 |
Roof laid |
-
latitude : 22.52810867037624,22.5281875859946
Longitude : 87.91335638612509,87.9132932703942
file name : Image_05092022133450699.png
|
2022-09-05 13:34:50.816853 |
156 |
47518993 |
Extension of pipeline for drinking water from South Malia Gulmapara to Paiker para |
327500 |
Extension of pipeline for drinking water from South Malia Gulmapara to Paiker para1 |
Plinth level |
-
latitude : 22.528070071712136,22.52804928459227
Longitude : 87.91351916268468,87.91346074081957
file name : Image_05092022133127354.png
|
2022-09-05 13:31:27.479822 |
157 |
47518993 |
Extension of pipeline for drinking water from South Malia Gulmapara to Paiker para |
327500 |
Extension of pipeline for drinking water from South Malia Gulmapara to Paiker para1 |
Completion of work |
-
latitude : 22.528106030076742,22.528043501079082
Longitude : 87.91334272362292,87.91334389708936
file name : Image_05092022132758672.png
|
2022-09-05 13:27:58.785488 |
158 |
47557658 |
CONST OF ROAD FROM S MALIA SK TURU ALI HOU TO SK ABBAS ALI |
160000 |
CONST OF ROAD FROM S MALIA SK TURU ALI HOU TO SK ABBAS ALI 1 |
Roof laid |
-
latitude : 22.527688527479768,22.527701896615326
Longitude : 87.912407387048,87.91241685859859
file name : Image_05092022132147495.png
|
2022-09-05 13:21:47.598219 |
159 |
47557658 |
CONST OF ROAD FROM S MALIA SK TURU ALI HOU TO SK ABBAS ALI |
160000 |
CONST OF ROAD FROM S MALIA SK TURU ALI HOU TO SK ABBAS ALI 1 |
Plinth level |
-
latitude : 22.527770125307143,22.527722474187613
Longitude : 87.912423228845,87.91243814863265
file name : Image_05092022131929902.png
|
2022-09-05 13:19:30.009802 |
160 |
47557658 |
CONST OF ROAD FROM S MALIA SK TURU ALI HOU TO SK ABBAS ALI |
160000 |
CONST OF ROAD FROM S MALIA SK TURU ALI HOU TO SK ABBAS ALI 1 |
Completion of work |
-
latitude : 22.525291764177382,22.52800448331982
Longitude : 87.9046728182584,87.912394143641
file name : Image_05092022131509848.png
|
2022-09-05 13:15:09.94667 |
161 |
47519447 |
Extension of pipeline for drinking water from Kajiberia Binapani club to Mallick para |
327500 |
Extension of pipeline for drinking water from Kajiberia Binapani club to Mallick para1 |
Roof laid |
-
latitude : 22.525535468012094,22.525584544055164
Longitude : 87.90913836099207,87.90902302600443
file name : Image_26092022142943479.png
|
2022-09-26 14:29:43.5792 |
162 |
47519447 |
Extension of pipeline for drinking water from Kajiberia Binapani club to Mallick para |
327500 |
Extension of pipeline for drinking water from Kajiberia Binapani club to Mallick para1 |
Plinth level |
-
latitude : 22.525573521852493,22.52552943304181
Longitude : 87.9091075155884,87.90901439264417
file name : Image_26092022142628699.png
|
2022-09-26 14:26:28.792846 |
163 |
47519447 |
Extension of pipeline for drinking water from Kajiberia Binapani club to Mallick para |
327500 |
Extension of pipeline for drinking water from Kajiberia Binapani club to Mallick para1 |
Completion of work |
-
latitude : 22.52557808998972,22.525579892098904,22.525579892098904
Longitude : 87.9090728983283,87.90911380201578,87.90911380201578
file name : Image_26092022142401652.png
|
2022-09-26 14:24:01.748657 |
164 |
47519121 |
Extension of pipeline for drinking water at Bholsar |
200000 |
Extension of pipeline for drinking water at Bholsar 1 |
Roof laid |
-
latitude : 22.5270133651793,22.526992787607014,22.52696449868381
Longitude : 87.91607413440943,87.91607991792262,87.916041277349
file name : Image_26092022141635516.png
|
2022-09-26 14:16:35.608064 |
165 |
47519121 |
Extension of pipeline for drinking water at Bholsar |
200000 |
Extension of pipeline for drinking water at Bholsar 1 |
Plinth level |
-
latitude : 22.527016382664442,22.52700527664274
Longitude : 87.91606642305851,87.91609659790993
file name : Image_26092022141300176.png
|
2022-09-26 14:13:00.263599 |
166 |
47519121 |
Extension of pipeline for drinking water at Bholsar |
200000 |
Extension of pipeline for drinking water at Bholsar 1 |
Completion of work |
-
latitude : 22.52639800775796,22.526411460712552
Longitude : 87.9159062448889,87.91589031927288
file name : Image_26092022135136628.png
|
2022-09-26 13:51:36.744507 |
167 |
47321868 |
Construction of drainfrom Bakshi Sajal Chandra shop toUttam Pramanick hou |
300000 |
Construction of drainfrom Bakshi Sajal Chandra shop toUttam Pramanick hou1 |
Roof laid |
-
latitude : 22.52760990522802,22.52760990522802
Longitude : 87.89241218939424,87.89241218939424
file name : Image_26092022144926600.png
|
2022-09-26 14:49:26.708379 |
168 |
47321868 |
Construction of drainfrom Bakshi Sajal Chandra shop toUttam Pramanick hou |
300000 |
Construction of drainfrom Bakshi Sajal Chandra shop toUttam Pramanick hou1 |
Plinth level |
-
latitude : 22.527680438943207,22.52769255079329
Longitude : 87.89217305369675,87.8921240195632
file name : Image_26092022144700533.png
|
2022-09-26 14:47:00.662862 |
169 |
47321868 |
Construction of drainfrom Bakshi Sajal Chandra shop toUttam Pramanick hou |
300000 |
Construction of drainfrom Bakshi Sajal Chandra shop toUttam Pramanick hou1 |
Completion of work |
-
latitude : 22.527595446445048,22.527595446445048
Longitude : 87.89243884384632,87.89243884384632
file name : Image_26092022144015808.png
|
2022-09-26 14:40:15.923512 |
170 |
56407212 |
Repairing of tubewell at Kansrakotai mouza |
170400 |
Repairing of tubewell at Kansrakotai mouza1 |
Completion of work |
-
latitude : 22.528837057761848
Longitude : 87.90489619597793
file name : Image_09032023161257557.png
|
2023-03-09 16:12:57.650196 |
171 |
56407258 |
Repairing of tubewell at Mankur mouza |
170400 |
Repairing of tubewell at Mankur mouza1 |
Completion of work |
-
latitude : 22.5219668
Longitude : 87.9041215
file name : Image_09032023164212431.png
|
2023-03-09 16:42:12.515412 |
172 |
56407282 |
Repairing of tubewell at Deulgram Mouza |
284000 |
Repairing of tubewell at Deulgram Mouza1 |
Completion of work |
-
latitude : 22.52490661572665
Longitude : 87.91291046887636
file name : Image_03052023153415954.png
|
2023-05-03 15:34:16.048768 |
173 |
56407332 |
Repairing of tubewell at Bholsar Mouza |
284000 |
Repairing of tubewell at Bholsar Mouza1 |
Completion of work |
-
latitude : 22.524149
Longitude : 87.9149058
file name : Image_03052023153023452.png
|
2023-05-03 15:30:23.556497 |
174 |
56407239 |
Repairing of tubewell at Bakshi mouza |
284000 |
Repairing of tubewell at Bakshi mouza1 |
Completion of work |
-
latitude : 22.5246969
Longitude : 87.8996243
file name : Image_03052023152014763.png
|
2023-05-03 15:20:14.861465 |
175 |
47559707 |
CONST OF ROAD FROM BHOLSAR KALO ALI TO BURNING GHAT WITH PILLING |
283904 |
CONST OF ROAD FROM BHOLSAR KALO ALI TO BURNING GHAT WITH PILLING1 |
Roof laid |
-
latitude : 22.52007939387113,22.52007939387113
Longitude : 87.91068918071687,87.91068918071687
file name : Image_14112022141344067.png
|
2022-11-14 14:13:44.153491 |
176 |
47559707 |
CONST OF ROAD FROM BHOLSAR KALO ALI TO BURNING GHAT WITH PILLING |
283904 |
CONST OF ROAD FROM BHOLSAR KALO ALI TO BURNING GHAT WITH PILLING1 |
Plinth level |
-
latitude : 22.53111789934337,22.531118066981435
Longitude : 87.91814563795924,87.9181447159499
file name : Image_11112022151636504.png
|
2022-11-11 15:16:36.599819 |
177 |
47559707 |
CONST OF ROAD FROM BHOLSAR KALO ALI TO BURNING GHAT WITH PILLING |
283904 |
CONST OF ROAD FROM BHOLSAR KALO ALI TO BURNING GHAT WITH PILLING1 |
Completion of work |
-
latitude : 22.5025862,22.53114291932434
Longitude : 87.9345526,87.91816013865173
file name : Image_11112022151018679.png
|
2022-11-11 15:10:18.772843 |
178 |
67095312 |
Construction of Burnning Ghat at Chilampur |
265572 |
Construction of Burnning Ghat at Chilampur1 |
Roof laid |
-
latitude : 22.52065778709948
Longitude : 87.91029439307749
file name : Image_15052023154538551.png
|
2023-05-15 15:45:38.655306 |
179 |
67095312 |
Construction of Burnning Ghat at Chilampur |
265572 |
Construction of Burnning Ghat at Chilampur1 |
Plinth level |
-
latitude : 22.520682807080448
Longitude : 87.91029640473425
file name : Image_15052023153951500.png
|
2023-05-15 15:39:51.691489 |
180 |
67095312 |
Construction of Burnning Ghat at Chilampur |
265572 |
Construction of Burnning Ghat at Chilampur1 |
Completion of work |
-
latitude : 22.52587019931525
Longitude : 87.90529777295887
file name : Image_15052023153729343.png
|
2023-05-15 15:37:29.459121 |
181 |
56405858 |
Const of road from Bakshi Tapash Mondal house to Asit Mondal house |
39607 |
Const of road from Bakshi Tapash Mondal house to Asit Mondal house1 |
Roof laid |
-
latitude : 22.526164446026087,22.5266462
Longitude : 87.89658143185079,87.894705
file name : Image_24052023152528530.png
|
2023-05-24 15:25:28.636226 |
182 |
56405858 |
Const of road from Bakshi Tapash Mondal house to Asit Mondal house |
39607 |
Const of road from Bakshi Tapash Mondal house to Asit Mondal house1 |
Plinth level |
-
latitude : 22.526115872897208,22.526092613115907
Longitude : 87.89660079404712,87.89657765999436
file name : Image_24052023151954647.png
|
2023-05-24 15:19:54.739595 |
183 |
56405858 |
Const of road from Bakshi Tapash Mondal house to Asit Mondal house |
39607 |
Const of road from Bakshi Tapash Mondal house to Asit Mondal house1 |
Completion of work |
-
latitude : 22.526129325851798,22.526129325851798
Longitude : 87.89653021842241,87.89653021842241
file name : Image_24052023151738196.png
|
2023-05-24 15:17:38.28871 |
184 |
67095695 |
Water Supply to villages |
251154 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.533612227998674,22.533582388423383
Longitude : 87.89914419874549,87.89921561256051
file name : Image_24052023150952109.png
|
2023-05-24 15:09:52.236046 |
185 |
67095695 |
Water Supply to villages |
251154 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.5318586,22.533731083385646
Longitude : 87.894705,87.89923958480358
file name : Image_24052023150423937.png
|
2023-05-24 15:04:24.04422 |
186 |
56406945 |
Const of road from Balaram Chandra house to Rabi Kundu house via Sadar Bakul |
143475 |
Const of road from Balaram Chandra house to Rabi Kundu house via Sadar Bakul1 |
Roof laid |
-
latitude : 22.5133152,22.513282424770296
Longitude : 87.9032166,87.90282653644681
file name : Image_30052023143044526.png
|
2023-05-30 14:30:44.610255 |
187 |
56406945 |
Const of road from Balaram Chandra house to Rabi Kundu house via Sadar Bakul |
143475 |
Const of road from Balaram Chandra house to Rabi Kundu house via Sadar Bakul1 |
Plinth level |
-
latitude : 22.513307738117874,22.5133152
Longitude : 87.90259745903313,87.9032166
file name : Image_30052023142709670.png
|
2023-05-30 14:27:09.760542 |
188 |
56406945 |
Const of road from Balaram Chandra house to Rabi Kundu house via Sadar Bakul |
143475 |
Const of road from Balaram Chandra house to Rabi Kundu house via Sadar Bakul1 |
Completion of work |
-
latitude : 22.513333344832063,22.513310671783984
Longitude : 87.90263056755066,87.90260944515467
file name : Image_30052023142426018.png
|
2023-05-30 14:24:26.102357 |
189 |
67095774 |
Creation of Shed for segregation and processing of wet and dry waste |
1270000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 22.533393250778317
Longitude : 87.8991019539535
file name : Image_05062023165038288.png
|
2023-06-05 16:50:38.384405 |
190 |
67095774 |
Creation of Shed for segregation and processing of wet and dry waste |
1270000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 22.53339907620102
Longitude : 87.8990453761071
file name : Image_05062023164637592.png
|
2023-06-05 16:46:37.687199 |
191 |
67408145 |
Procurement of Computer |
140000 |
Procurement of Computer1 |
|
-
latitude : 22.5219101
Longitude : 87.9041128
file name : Image_29122023133122673.png
|
2023-12-29 13:31:22.78113 |
192 |
67408733 |
Procurement of Printer |
50000 |
Procurement of Printer1 |
|
-
latitude : 22.5219496
Longitude : 87.9041104
file name : Image_05012024151720757.png
|
2024-01-05 15:17:20.86266 |
193 |
47567678 |
CONST OF ROAD FROM MANKUR SK PARA MASJIT TO HANNAN ALI HOU |
350000 |
CONST OF ROAD FROM MANKUR SK PARA MASJIT TO HANNAN ALI HOU1 |
Roof laid |
-
latitude : 22.512195501476526,22.512205098755658
Longitude : 87.89901008829474,87.89902274496853
file name : Image_08032022172248651.png
|
2022-03-08 17:22:48.742867 |
194 |
47567678 |
CONST OF ROAD FROM MANKUR SK PARA MASJIT TO HANNAN ALI HOU |
350000 |
CONST OF ROAD FROM MANKUR SK PARA MASJIT TO HANNAN ALI HOU1 |
Plinth level |
-
latitude : 22.51220740377903,22.51222672406584
Longitude : 87.89901302196085,87.89902232587337
file name : Image_08032022172041251.png
|
2022-03-08 17:20:41.340971 |
195 |
47567678 |
CONST OF ROAD FROM MANKUR SK PARA MASJIT TO HANNAN ALI HOU |
350000 |
CONST OF ROAD FROM MANKUR SK PARA MASJIT TO HANNAN ALI HOU1 |
Completion of work |
-
latitude : 22.512185527011752,22.512238207273185
Longitude : 87.89900807663798,87.89888796396554
file name : Image_08032022171609804.png
|
2022-03-08 17:16:09.90335 |
196 |
47519254 |
Extension of pipeline for drinking water from Mankur Bose burming Ghat to Avijit Bose |
327500 |
Extension of pipeline for drinking water from Mankur Bose burming Ghat to Avijit Bose1 |
Roof laid |
-
latitude : 22.518000933341682,22.5182986
Longitude : 87.90255445986986,87.9034268
file name : Image_14112022135353982.png
|
2022-11-14 13:53:54.099726 |
197 |
47519254 |
Extension of pipeline for drinking water from Mankur Bose burming Ghat to Avijit Bose |
327500 |
Extension of pipeline for drinking water from Mankur Bose burming Ghat to Avijit Bose1 |
Plinth level |
-
latitude : 22.51799691002816,22.5182986
Longitude : 87.90250450372696,87.9034268
file name : Image_14112022135010890.png
|
2022-11-14 13:50:11.005658 |
198 |
47519254 |
Extension of pipeline for drinking water from Mankur Bose burming Ghat to Avijit Bose |
327500 |
Extension of pipeline for drinking water from Mankur Bose burming Ghat to Avijit Bose1 |
Completion of work |
-
latitude : 22.51803182065487,22.518005585297942
Longitude : 87.90256133303046,87.90251355618238
file name : Image_14112022134741902.png
|
2022-11-14 13:47:42.015831 |
199 |
47519360 |
Extension of pipeline for drinking water from Chilampur Ganesh Bera land to Rabin Manna hos |
327500 |
Extension of pipeline for drinking water from Chilampur Ganesh Bera land to Rabin Manna hos1 |
Roof laid |
-
latitude : 22.516822228208184,22.516805841587484
Longitude : 87.90900408290327,87.90900743566453
file name : Image_23122022155553506.png
|
2022-12-23 15:55:53.607108 |
200 |
47519360 |
Extension of pipeline for drinking water from Chilampur Ganesh Bera land to Rabin Manna hos |
327500 |
Extension of pipeline for drinking water from Chilampur Ganesh Bera land to Rabin Manna hos1 |
Plinth level |
-
latitude : 22.516823024488986,22.51683392096311
Longitude : 87.90900500491261,87.90896921418607
file name : Image_23122022155114814.png
|
2022-12-23 15:51:14.912178 |
201 |
47519360 |
Extension of pipeline for drinking water from Chilampur Ganesh Bera land to Rabin Manna hos |
327500 |
Extension of pipeline for drinking water from Chilampur Ganesh Bera land to Rabin Manna hos1 |
Completion of work |
-
latitude : 22.516756472177804,22.516851271502674
Longitude : 87.90898094885051,87.9090126324445
file name : Image_23122022154617292.png
|
2022-12-23 15:46:17.392207 |
202 |
47519035 |
Extension of pipe line for drinking water from Mankur Swarajit Baur shop to Sukh Mondal hou |
327500 |
Extension of pipe line for drinking water from Mankur Swarajit Baur shop to Sukh Mondal hou1 |
Roof laid |
-
latitude : 22.5194987,22.5195151
Longitude : 87.9016544,87.9016584
file name : Image_11012023161408773.png
|
2023-01-11 16:14:08.878004 |
203 |
47519035 |
Extension of pipe line for drinking water from Mankur Swarajit Baur shop to Sukh Mondal hou |
327500 |
Extension of pipe line for drinking water from Mankur Swarajit Baur shop to Sukh Mondal hou1 |
Plinth level |
-
latitude : 22.519541,22.5194631
Longitude : 87.9016681,87.901628
file name : Image_11012023161124505.png
|
2023-01-11 16:11:24.607714 |
204 |
47519035 |
Extension of pipe line for drinking water from Mankur Swarajit Baur shop to Sukh Mondal hou |
327500 |
Extension of pipe line for drinking water from Mankur Swarajit Baur shop to Sukh Mondal hou1 |
Completion of work |
-
latitude : 22.5195094,22.5195094
Longitude : 87.9016587,87.9016587
file name : Image_11012023160610312.png
|
2023-01-11 16:06:10.414832 |
205 |
34554394 |
Construction of Chilampur ID-Ga shed at Chilampur |
340706 |
Construction of Chilampur ID-Ga shed at Chilampur1 |
Roof laid |
-
latitude : 22.518420447595417
Longitude : 87.90752484463155
file name : Image_26112021142809773.png
|
2021-11-26 14:28:09.87834 |
206 |
34554394 |
Construction of Chilampur ID-Ga shed at Chilampur |
340706 |
Construction of Chilampur ID-Ga shed at Chilampur1 |
Roof laid |
-
latitude : 22.518496261909604
Longitude : 87.90748477913439
file name : Image_26112021142812523.png
|
2021-11-26 14:28:12.632533 |
207 |
34554394 |
Construction of Chilampur ID-Ga shed at Chilampur |
340706 |
Construction of Chilampur ID-Ga shed at Chilampur1 |
Plinth level |
-
latitude : 22.518392032943666
Longitude : 87.90753867477179
file name : Image_23112021152934693.png
|
2021-11-23 15:29:34.81408 |
208 |
34554394 |
Construction of Chilampur ID-Ga shed at Chilampur |
340706 |
Construction of Chilampur ID-Ga shed at Chilampur1 |
Completion of work |
-
latitude : 22.51835821196437
Longitude : 87.90748578496277
file name : Image_18112021163423083.png
|
2021-11-18 16:34:23.195571 |
209 |
56397593 |
Const Common service centre at Kansra Shibtala |
239893 |
Const Common service centre at Kansra Shibtala1 |
Plinth level |
-
latitude : 22.533428412862122
Longitude : 87.90833101607859
file name : Image_27072023131317570.png
|
2023-07-27 13:13:17.68099 |
210 |
56397593 |
Const Common service centre at Kansra Shibtala |
239893 |
Const Common service centre at Kansra Shibtala1 |
Completion of work |
-
latitude : 22.5327447
Longitude : 87.9087364
file name : Image_27072023130804879.png
|
2023-07-27 13:08:04.986791 |
211 |
56392910 |
Drinking water supply from housevto house by sub mersible pump at sansad XVIII |
211272 |
Drinking water supply from housevto house by sub mersible pump at sansad XVIII1 |
Completion of work |
-
latitude : 22.507306882180274,22.507306882180274
Longitude : 87.89502390660346,87.89502390660346
file name : Image_27072023133758397.png
|
2023-07-27 13:37:58.500465 |
212 |
56379326 |
Constu house of cover drain from Mankur Lal to Taharat Mallick house |
300450 |
Constu house of cover drain from Mankur Lal to Taharat Mallick house1 |
Roof laid |
-
latitude : 22.5112248,22.5112193
Longitude : 87.9018199,87.9018258
file name : Image_01112023161536783.png
|
2023-11-01 16:15:36.87018 |
213 |
56379326 |
Constu house of cover drain from Mankur Lal to Taharat Mallick house |
300450 |
Constu house of cover drain from Mankur Lal to Taharat Mallick house1 |
Plinth level |
-
latitude : 22.5110498,22.511251
Longitude : 87.9020224,87.9017819
file name : Image_01112023161053697.png
|
2023-11-01 16:10:53.789224 |
214 |
56379326 |
Constu house of cover drain from Mankur Lal to Taharat Mallick house |
300450 |
Constu house of cover drain from Mankur Lal to Taharat Mallick house1 |
Completion of work |
-
latitude : 22.5110675,22.5110884
Longitude : 87.9020046,87.9019735
file name : Image_01112023160318957.png
|
2023-11-01 16:03:19.042414 |
215 |
56379172 |
Const of cover drain at Khanra Answer Li Garden to Kamar Danga |
300450 |
Const of cover drain at Khanra Answer Li Garden to Kamar Danga1 |
Plinth level |
-
latitude : 22.5240956,22.5240962
Longitude : 87.9148073,87.9148096
file name : Image_19092023134928640.png
|
2023-09-19 13:49:28.722382 |
216 |
56379172 |
Const of cover drain at Khanra Answer Li Garden to Kamar Danga |
300450 |
Const of cover drain at Khanra Answer Li Garden to Kamar Danga1 |
Completion of work |
-
latitude : 22.5240963,22.5240963
Longitude : 87.9148018,87.9148025
file name : Image_19092023134602975.png
|
2023-09-19 13:46:03.081142 |
217 |
67375721 |
Water Supply to villages |
175000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.519772658124566,22.519772658124566
Longitude : 87.89627993479371,87.89627993479371
file name : Image_09012024143548647.png
|
2024-01-09 14:35:48.730472 |
218 |
67375721 |
Water Supply to villages |
175000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.519772658124566,22.519772658124566
Longitude : 87.89627993479371,87.89627993479371
file name : Image_09012024143237824.png
|
2024-01-09 14:32:37.921383 |
219 |
67375721 |
Water Supply to villages |
175000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.5257817,22.51975966617465
Longitude : 87.8855044,87.896275408566
file name : Image_09012024143021846.png
|
2024-01-09 14:30:21.933233 |
220 |
67429566 |
Repairing and maintenance of roads |
50000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 22.5118852,22.5118855
Longitude : 87.8989838,87.8989837
file name : Image_10012024145916499.png
|
2024-01-10 14:59:16.621572 |
221 |
67429566 |
Repairing and maintenance of roads |
50000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 22.5118845,22.5118845
Longitude : 87.8989839,87.8989839
file name : Image_10012024145617554.png
|
2024-01-10 14:56:17.646289 |
222 |
67429566 |
Repairing and maintenance of roads |
50000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 22.5118849,22.5118843
Longitude : 87.8989839,87.8989837
file name : Image_10012024145349312.png
|
2024-01-10 14:53:49.402834 |
223 |
67427863 |
Operation and Maintenance of drinking water supply system |
280000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 22.528470307588577
Longitude : 87.89673280902207
file name : Image_10012024142918942.png
|
2024-01-10 14:29:19.047792 |
224 |
67427863 |
Operation and Maintenance of drinking water supply system |
280000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 22.528373831883073
Longitude : 87.8967965953052
file name : Image_10012024142550305.png
|
2024-01-10 14:25:50.400329 |
225 |
67427863 |
Operation and Maintenance of drinking water supply system |
280000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 22.52847382798791
Longitude : 87.89675460197031
file name : Image_10012024142116994.png
|
2024-01-10 14:21:17.093941 |
226 |
67427923 |
Operation and Maintenance of drinking water supply system |
280000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 22.511703106574714
Longitude : 87.89789278060198
file name : Image_10012024145006437.png
|
2024-01-10 14:50:06.564658 |
227 |
67427923 |
Operation and Maintenance of drinking water supply system |
280000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 22.511681732721627
Longitude : 87.89802731014788
file name : Image_10012024144709428.png
|
2024-01-10 14:47:09.523104 |
228 |
67427923 |
Operation and Maintenance of drinking water supply system |
280000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 22.51170708797872
Longitude : 87.8979179263115
file name : Image_10012024144432136.png
|
2024-01-10 14:44:32.234832 |
229 |
67374807 |
Water Supply to villages |
225000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.527498970739543
Longitude : 87.89252920076251
file name : Image_22112023142811280.png
|
2023-11-22 14:28:11.388225 |
230 |
67374807 |
Water Supply to villages |
225000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.527582999318838
Longitude : 87.89246323518455
file name : Image_22112023142550300.png
|
2023-11-22 14:25:50.393953 |
231 |
67374807 |
Water Supply to villages |
225000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.527591129764915
Longitude : 87.89241327904165
file name : Image_22112023142108399.png
|
2023-11-22 14:21:08.484526 |
232 |
67375496 |
Water Supply to villages |
225000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.530251294374466,22.530205445364118
Longitude : 87.89779714308679,87.89778356440365
file name : Image_22112023144049070.png
|
2023-11-22 14:40:49.162803 |
233 |
67375496 |
Water Supply to villages |
225000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.53025841899216,22.53027522470802
Longitude : 87.89771625772119,87.89775221608579
file name : Image_22112023143850632.png
|
2023-11-22 14:38:50.729502 |
234 |
67375496 |
Water Supply to villages |
225000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.53022141288966,22.53030619584024
Longitude : 87.89776311255991,87.89776177145541
file name : Image_22112023143449423.png
|
2023-11-22 14:34:49.515031 |
235 |
67406722 |
Construction of roads |
200595 |
Construction of roads1 |
Roof laid |
-
latitude : 22.51442353706807,22.514380998909473
Longitude : 87.90018565021455,87.90030534379184
file name : Image_22112023145916260.png
|
2023-11-22 14:59:16.354413 |
236 |
67406722 |
Construction of roads |
200595 |
Construction of roads1 |
Plinth level |
-
latitude : 22.514135031960905,22.51408318988979
Longitude : 87.90023233741522,87.9003160726279
file name : Image_22112023145559202.png
|
2023-11-22 14:55:59.300642 |
237 |
67406722 |
Construction of roads |
200595 |
Construction of roads1 |
Completion of work |
-
latitude : 22.514358493499458,22.514436822384596
Longitude : 87.90033887140453,87.90029503405094
file name : Image_22112023145354684.png
|
2023-11-22 14:53:54.778111 |
238 |
56407401 |
Repairing of GP Office Building |
99210 |
Repairing of GP Office Building1 |
Roof laid |
-
latitude : 22.5219789
Longitude : 87.9041818
file name : Image_22112023122802535.png
|
2023-11-22 12:28:02.623975 |
239 |
56407401 |
Repairing of GP Office Building |
99210 |
Repairing of GP Office Building1 |
Plinth level |
-
latitude : 22.5219901
Longitude : 87.9042258
file name : Image_22112023122230142.png
|
2023-11-22 12:22:30.229906 |
240 |
56407401 |
Repairing of GP Office Building |
99210 |
Repairing of GP Office Building1 |
Completion of work |
-
latitude : 22.5220012
Longitude : 87.9042018
file name : Image_22112023121659609.png
|
2023-11-22 12:16:59.703297 |
241 |
67405432 |
Construction of roads |
203193 |
Construction of roads1 |
Roof laid |
-
latitude : 22.529388586990535,22.52935434691608
Longitude : 87.91214905679226,87.91219758801162
file name : Image_05012024150129221.png
|
2024-01-05 15:01:29.315089 |
242 |
67405432 |
Construction of roads |
203193 |
Construction of roads1 |
Plinth level |
-
latitude : 22.529293997213244,22.529209339991212
Longitude : 87.91220529936254,87.91218576952815
file name : Image_05012024145433293.png
|
2024-01-05 14:54:33.414039 |
243 |
67405432 |
Construction of roads |
203193 |
Construction of roads1 |
Completion of work |
-
latitude : 22.529201335273683,22.52917313016951
Longitude : 87.91215928271413,87.91210119612515
file name : Image_05012024144812457.png
|
2024-01-05 14:48:12.547582 |
244 |
67377186 |
Water Supply to villages |
155087 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.528725662268698
Longitude : 87.91223270818591
file name : Image_06122023144051529.png
|
2023-12-06 14:40:51.621003 |
245 |
67377186 |
Water Supply to villages |
155087 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.528728931210935
Longitude : 87.9120968375355
file name : Image_06122023143616831.png
|
2023-12-06 14:36:16.928838 |
246 |
67377186 |
Water Supply to villages |
155087 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.528779935091734
Longitude : 87.9121935646981
file name : Image_01122023154012574.png
|
2023-12-01 15:40:12.677472 |
247 |
67375614 |
Water Supply to villages |
175000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.519142632372677
Longitude : 87.91006917133927
file name : Image_06122023142908718.png
|
2023-12-06 14:29:08.819976 |
248 |
67375614 |
Water Supply to villages |
175000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.51920755021274
Longitude : 87.9100903775543
file name : Image_06122023142234021.png
|
2023-12-06 14:22:34.109299 |
249 |
67375614 |
Water Supply to villages |
175000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.519409637898207
Longitude : 87.91009842418134
file name : Image_01122023152806833.png
|
2023-12-01 15:28:06.924345 |
250 |
67405628 |
Construction of roads |
203409 |
Construction of roads1 |
Roof laid |
-
latitude : 22.521885400637984,22.521862015128136
Longitude : 87.91020680218935,87.91015533730388
file name : Image_20122023131955455.png
|
2023-12-20 13:19:55.542036 |
251 |
67405628 |
Construction of roads |
203409 |
Construction of roads1 |
Plinth level |
-
latitude : 22.5200719,22.5200719,22.52239254768938,22.522471379488707
Longitude : 87.9045169,87.9045169,87.91027234867215,87.91032037697732
file name : Image_20122023131706338.png
|
2023-12-20 13:17:06.425441 |
252 |
67405628 |
Construction of roads |
203409 |
Construction of roads1 |
Completion of work |
-
latitude : 22.52250452991575,22.522524939849973
Longitude : 87.91032121516764,87.91037544608116
file name : Image_01122023153116670.png
|
2023-12-01 15:31:16.763678 |
253 |
70290282 |
Construction of Community Sanitary Complex |
781086 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 22.514553414657712
Longitude : 87.89935676380992
file name : Image_05122023123825742.png
|
2023-12-05 12:38:25.825896 |
254 |
70290282 |
Construction of Community Sanitary Complex |
781086 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 22.514466955326498
Longitude : 87.89941585622728
file name : Image_05122023123402768.png
|
2023-12-05 12:34:02.852804 |
255 |
70290282 |
Construction of Community Sanitary Complex |
781086 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 22.514579398557544
Longitude : 87.89949615485966
file name : Image_01122023151633072.png
|
2023-12-01 15:16:33.212692 |
256 |
67376460 |
Water Supply to villages |
225000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.50577869359404
Longitude : 87.89522976614535
file name : Image_06122023162332031.png
|
2023-12-06 16:23:32.124024 |
257 |
67376460 |
Water Supply to villages |
225000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.505827476270497
Longitude : 87.89512692019343
file name : Image_06122023162044289.png
|
2023-12-06 16:20:44.372001 |
258 |
67376460 |
Water Supply to villages |
225000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.505740178748965
Longitude : 87.89512348361313
file name : Image_01122023132115570.png
|
2023-12-01 13:21:15.6796 |
259 |
67406975 |
Construction of roads |
206220 |
Construction of roads1 |
Roof laid |
-
latitude : 22.509415,22.508766213431954
Longitude : 87.8970304,87.89759824052453
file name : Image_06122023160700933.png
|
2023-12-06 16:07:01.024836 |
260 |
67406975 |
Construction of roads |
206220 |
Construction of roads1 |
Plinth level |
-
latitude : 22.5091668,22.5093961
Longitude : 87.8976142,87.8970886
file name : Image_06122023160330991.png
|
2023-12-06 16:03:31.085875 |
261 |
67406975 |
Construction of roads |
206220 |
Construction of roads1 |
Completion of work |
-
latitude : 22.508813361637294,22.50891226809472
Longitude : 87.8975875955075,87.89764601737261
file name : Image_06122023155545476.png
|
2023-12-06 15:55:45.563662 |
262 |
56379343 |
Const of cover drain from Deygram Subhas Mondal house to BHanu Mondal house |
175517 |
Const of cover drain from Deygram Subhas Mondal house to BHanu Mondal house1 |
Roof laid |
-
latitude : 22.506358176469803,22.5063703302294
Longitude : 87.89332120679319,87.89331936277449
file name : Image_19022024161648374.png
|
2024-02-19 16:16:48.787684 |
263 |
56379343 |
Const of cover drain from Deygram Subhas Mondal house to BHanu Mondal house |
175517 |
Const of cover drain from Deygram Subhas Mondal house to BHanu Mondal house1 |
Plinth level |
-
latitude : 22.506376155652106,22.506429255008698
Longitude : 87.89333352819085,87.89331626147032
file name : Image_19022024161304553.png
|
2024-02-19 16:13:05.164663 |
264 |
56379343 |
Const of cover drain from Deygram Subhas Mondal house to BHanu Mondal house |
175517 |
Const of cover drain from Deygram Subhas Mondal house to BHanu Mondal house1 |
Completion of work |
-
latitude : 22.521643708460033,22.506359391845763
Longitude : 87.90373479947448,87.89329564198852
file name : Image_19022024160322863.png
|
2024-02-19 16:03:22.975619 |
265 |
67375657 |
Water Supply to villages |
191172 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.522419160231948,22.522531310096383
Longitude : 87.8973806463182,87.89741668850183
file name : Image_27022024133821402.png
|
2024-02-27 13:38:21.48712 |
266 |
67375657 |
Water Supply to villages |
191172 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.522460189647973,22.522460189647973
Longitude : 87.89739749394357,87.89739749394357
file name : Image_27022024133148753.png
|
2024-02-27 13:31:48.857897 |
267 |
67375657 |
Water Supply to villages |
191172 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.520745,22.522408138029277
Longitude : 87.898998,87.89726061746478
file name : Image_27022024132811150.png
|
2024-02-27 13:28:11.244199 |
268 |
67408235 |
Internet in GP Bhawan |
40000 |
Internet in GP Bhawan1 |
Roof laid |
-
latitude : 22.5219158
Longitude : 87.9041196
file name : Image_26122023142636962.png
|
2023-12-26 14:26:37.056154 |
269 |
67408235 |
Internet in GP Bhawan |
40000 |
Internet in GP Bhawan1 |
Plinth level |
-
latitude : 22.5219109
Longitude : 87.9041162
file name : Image_26122023142442840.png
|
2023-12-26 14:24:42.93745 |
270 |
67408235 |
Internet in GP Bhawan |
40000 |
Internet in GP Bhawan1 |
Completion of work |
-
latitude : 22.5219089
Longitude : 87.9041086
file name : Image_26122023141755731.png
|
2023-12-26 14:17:55.82166 |
271 |
67400527 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
99000 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
Roof laid |
-
latitude : 22.53317184280604
Longitude : 87.89895376190543
file name : Image_20032024152050814.png
|
2024-03-20 15:20:51.963016 |
272 |
67400527 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
99000 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
Plinth level |
-
latitude : 22.533265091478825
Longitude : 87.89900723844767
file name : Image_20032024151319281.png
|
2024-03-20 15:13:19.380053 |
273 |
67400527 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
99000 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
Completion of work |
-
latitude : 22.533408841118217
Longitude : 87.89899667724967
file name : Image_20032024150745547.png
|
2024-03-20 15:07:45.643667 |
274 |
56379278 |
Const of cover drain at Deulgram Badamtala |
299472 |
Const of cover drain at Deulgram Badamtala1 |
Roof laid |
-
latitude : 22.51791191753,22.517886688001454
Longitude : 87.9000694770366,87.90007852949202
file name : Image_15032024154547738.png
|
2024-03-15 15:45:47.836644 |
275 |
56379278 |
Const of cover drain at Deulgram Badamtala |
299472 |
Const of cover drain at Deulgram Badamtala1 |
Plinth level |
-
latitude : 22.5179248675704,22.5179248675704
Longitude : 87.90028824470937,87.90028824470937
file name : Image_15032024154058561.png
|
2024-03-15 15:40:58.664669 |
276 |
56379278 |
Const of cover drain at Deulgram Badamtala |
299472 |
Const of cover drain at Deulgram Badamtala1 |
Completion of work |
-
latitude : 22.52573747187853,22.52573747187853
Longitude : 87.90533230639994,87.90533230639994
file name : Image_15032024153519108.png
|
2024-03-15 15:35:19.250732 |
277 |
67376362 |
Water Supply to villages |
190576 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.5059016,22.5059032
Longitude : 87.8942982,87.8942968
file name : Image_12032024171724813.png
|
2024-03-12 17:17:24.921179 |
278 |
67376362 |
Water Supply to villages |
190576 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.5059034,22.5059033
Longitude : 87.8943021,87.8942997
file name : Image_12032024171421042.png
|
2024-03-12 17:14:21.146637 |
279 |
67376362 |
Water Supply to villages |
190576 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.511640787124634,22.5059039
Longitude : 87.89914780296385,87.8942973
file name : Image_12032024171104504.png
|
2024-03-12 17:11:04.607911 |
280 |
67375436 |
Water Supply to villages |
175000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.53466407302767
Longitude : 87.91341916657984
file name : Image_13032024162617864.png
|
2024-03-13 16:26:17.963372 |
281 |
67375436 |
Water Supply to villages |
175000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.534584696404636
Longitude : 87.91338429786265
file name : Image_13032024161418444.png
|
2024-03-13 16:14:18.52088 |
282 |
67375436 |
Water Supply to villages |
175000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.53488149959594
Longitude : 87.91343810968101
file name : Image_13032024160912292.png
|
2024-03-13 16:09:12.388447 |
283 |
70286618 |
Construction of Community Sanitary Complex |
769865 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 22.5346726
Longitude : 87.9112588
file name : Image_13032024160138259.png
|
2024-03-13 16:01:38.351283 |
284 |
70286618 |
Construction of Community Sanitary Complex |
769865 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 22.5348709
Longitude : 87.9112973
file name : Image_13032024155833127.png
|
2024-03-13 15:58:33.212157 |
285 |
70286618 |
Construction of Community Sanitary Complex |
769865 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 22.5347005
Longitude : 87.9112542
file name : Image_13032024155537997.png
|
2024-03-13 15:55:38.096564 |
286 |
67428139 |
Operation and Maintenance of drinking water supply system |
280000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 22.52622135914862
Longitude : 87.91217881254852
file name : Image_18032024152716663.png
|
2024-03-18 15:27:16.767436 |
287 |
67428139 |
Operation and Maintenance of drinking water supply system |
280000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 22.526106359437108
Longitude : 87.91219364851713
file name : Image_18032024152348020.png
|
2024-03-18 15:23:48.135369 |
288 |
67428139 |
Operation and Maintenance of drinking water supply system |
280000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 22.526161805726588
Longitude : 87.91221493855119
file name : Image_18032024152024611.png
|
2024-03-18 15:20:24.739034 |
289 |
67427981 |
Operation and Maintenance of drinking water supply system |
280000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 22.52297064755112
Longitude : 87.91165075264871
file name : Image_18032024153747371.png
|
2024-03-18 15:37:47.464684 |
290 |
67427981 |
Operation and Maintenance of drinking water supply system |
280000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 22.522856276482344
Longitude : 87.9116168897599
file name : Image_18032024153514308.png
|
2024-03-18 15:35:14.408392 |
291 |
67427981 |
Operation and Maintenance of drinking water supply system |
280000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 22.52293443772942
Longitude : 87.91165050119162
file name : Image_18032024153220946.png
|
2024-03-18 15:32:21.04884 |
292 |
56407015 |
Const of road from Mankur Dipak Bose house to Sukumar Bose via Raghunath Tempal |
250634 |
Const of road from Mankur Dipak Bose house to Sukumar Bose via Raghunath Tempal1 |
Roof laid |
-
latitude : 22.51741252373904,22.517449487932026
Longitude : 87.90046166628599,87.90053090080619
file name : Image_22022023154154595.png
|
2023-02-22 15:41:54.701565 |
293 |
56407015 |
Const of road from Mankur Dipak Bose house to Sukumar Bose via Raghunath Tempal |
250634 |
Const of road from Mankur Dipak Bose house to Sukumar Bose via Raghunath Tempal1 |
Plinth level |
-
latitude : 22.517436579801142,22.517433939501643
Longitude : 87.90043828077614,87.90035370737314
file name : Image_22022023153950872.png
|
2023-02-22 15:39:50.963157 |
294 |
56407015 |
Const of road from Mankur Dipak Bose house to Sukumar Bose via Raghunath Tempal |
250634 |
Const of road from Mankur Dipak Bose house to Sukumar Bose via Raghunath Tempal1 |
Completion of work |
-
latitude : 22.51743871718645,22.51753058284521
Longitude : 87.90038061328232,87.90040953084826
file name : Image_22022023153742462.png
|
2023-02-22 15:37:42.560673 |
295 |
56406979 |
Const of road from Mankur Patra para to Janannath Dolui Via Mira Dolui house |
201572 |
Const of road from Mankur Patra para to Janannath Dolui Via Mira Dolui house1 |
Roof laid |
-
latitude : 22.5130059,22.5130055
Longitude : 87.8989429,87.8989452
file name : Image_22022023152909043.png
|
2023-02-22 15:29:09.133433 |
296 |
56406979 |
Const of road from Mankur Patra para to Janannath Dolui Via Mira Dolui house |
201572 |
Const of road from Mankur Patra para to Janannath Dolui Via Mira Dolui house1 |
Plinth level |
-
latitude : 22.51226871740073,22.512355260550976
Longitude : 87.89839250966907,87.89829553104937
file name : Image_22022023152637773.png
|
2023-02-22 15:26:37.86445 |
297 |
56406979 |
Const of road from Mankur Patra para to Janannath Dolui Via Mira Dolui house |
201572 |
Const of road from Mankur Patra para to Janannath Dolui Via Mira Dolui house1 |
Completion of work |
-
latitude : 22.51223896164447,22.51222630497068
Longitude : 87.89857037365437,87.89847599342465
file name : Image_22022023152415341.png
|
2023-02-22 15:24:15.440112 |
298 |
67095436 |
Const of PCC road from Chilampur Andul Sasan to Gaus Ali house |
350000 |
Const of PCC road from Chilampur Andul Sasan to Gaus Ali house1 |
Roof laid |
-
latitude : 22.5233896,22.522765500470996
Longitude : 87.9155933,87.91586944833398
file name : Image_22032023133950529.png
|
2023-03-22 13:39:50.624705 |
299 |
67095436 |
Const of PCC road from Chilampur Andul Sasan to Gaus Ali house |
350000 |
Const of PCC road from Chilampur Andul Sasan to Gaus Ali house1 |
Plinth level |
-
latitude : 22.522371425293386,22.52229703590274
Longitude : 87.91589006781578,87.91575260460377
file name : Image_22032023133354841.png
|
2023-03-22 13:33:54.929261 |
300 |
67095436 |
Const of PCC road from Chilampur Andul Sasan to Gaus Ali house |
350000 |
Const of PCC road from Chilampur Andul Sasan to Gaus Ali house1 |
Completion of work |
-
latitude : 22.522699870169163,22.5233896
Longitude : 87.91592057794333,87.9155933
file name : Image_09032023160112188.png
|
2023-03-09 16:01:12.27222 |
301 |
56379610 |
Construction of RO and UV treatment unit of water at sansad III |
175000 |
Construction of RO and UV treatment unit of water at sansad III1 |
Roof laid |
-
latitude : 22.527963579632342
Longitude : 87.91657730005682
file name : Image_22032023132819094.png
|
2023-03-22 13:28:19.198325 |
302 |
56379610 |
Construction of RO and UV treatment unit of water at sansad III |
175000 |
Construction of RO and UV treatment unit of water at sansad III1 |
Plinth level |
-
latitude : 22.52795855049044
Longitude : 87.91657520458102
file name : Image_22032023132618899.png
|
2023-03-22 13:26:18.999701 |
303 |
56379610 |
Construction of RO and UV treatment unit of water at sansad III |
175000 |
Construction of RO and UV treatment unit of water at sansad III1 |
Completion of work |
-
latitude : 22.52790884580463
Longitude : 87.91648836806417
file name : Image_22032023132104253.png
|
2023-03-22 13:21:04.356956 |
304 |
56379593 |
Construction of RO and UV tretment unit at sansad IV |
175000 |
Construction of RO and UV tretment unit at sansad IV1 |
Roof laid |
-
latitude : 22.526144539006054
Longitude : 87.9120746254921
file name : Image_22032023135147077.png
|
2023-03-22 13:51:47.178487 |
305 |
56379593 |
Construction of RO and UV tretment unit at sansad IV |
175000 |
Construction of RO and UV tretment unit at sansad IV1 |
Plinth level |
-
latitude : 22.526164990849793
Longitude : 87.91206842288375
file name : Image_22032023134933020.png
|
2023-03-22 13:49:33.118615 |
306 |
56379593 |
Construction of RO and UV tretment unit at sansad IV |
175000 |
Construction of RO and UV tretment unit at sansad IV1 |
Completion of work |
-
latitude : 22.52612362615764
Longitude : 87.91217965073884
file name : Image_22032023134535840.png
|
2023-03-22 13:45:35.942218 |
307 |
56379557 |
Const of RO and UV treatment unit of water at sansad XIV |
175000 |
Const of RO and UV treatment unit of water at sansad XIV1 |
Roof laid |
-
latitude : 22.5109642
Longitude : 87.9022514
file name : Image_22032023140614406.png
|
2023-03-22 14:06:14.498928 |
308 |
56379557 |
Const of RO and UV treatment unit of water at sansad XIV |
175000 |
Const of RO and UV treatment unit of water at sansad XIV1 |
Plinth level |
-
latitude : 22.5108594
Longitude : 87.9024398
file name : Image_22032023140339672.png
|
2023-03-22 14:03:39.773798 |
309 |
56379557 |
Const of RO and UV treatment unit of water at sansad XIV |
175000 |
Const of RO and UV treatment unit of water at sansad XIV1 |
Completion of work |
-
latitude : 22.5108547
Longitude : 87.9024392
file name : Image_22032023140008584.png
|
2023-03-22 14:00:08.68771 |
310 |
56379601 |
Construction of RO and UV treatment unit of water at sansad XII |
175000 |
Construction of RO and UV treatment unit of water at sansad XII1 |
Roof laid |
-
latitude : 22.52065242268145
Longitude : 87.9021137394011
file name : Image_29032023153349279.png
|
2023-03-29 15:33:49.363539 |
311 |
56379601 |
Construction of RO and UV treatment unit of water at sansad XII |
175000 |
Construction of RO and UV treatment unit of water at sansad XII1 |
Plinth level |
-
latitude : 22.5201933
Longitude : 87.9020851
file name : Image_29032023153015805.png
|
2023-03-29 15:30:15.904515 |
312 |
56379601 |
Construction of RO and UV treatment unit of water at sansad XII |
175000 |
Construction of RO and UV treatment unit of water at sansad XII1 |
Completion of work |
-
latitude : 22.520659128203988
Longitude : 87.90222588926554
file name : Image_29032023152349078.png
|
2023-03-29 15:23:49.177353 |
313 |
56379601 |
Construction of RO and UV treatment unit of water at sansad XII |
175000 |
Construction of RO and UV treatment unit of water at sansad XII1 |
Completion of work |
-
latitude : 22.520650327205658
Longitude : 87.9021948762238
file name : Image_29032023152328777.png
|
2023-03-29 15:23:28.872942 |
314 |
56379571 |
Const of RO and UV tretment unit of water at sansad V |
175000 |
Const of RO and UV tretment unit of water at sansad V1 |
Roof laid |
-
latitude : 22.5346721
Longitude : 87.9116263
file name : Image_29032023155044044.png
|
2023-03-29 15:50:44.138694 |
315 |
56379571 |
Const of RO and UV tretment unit of water at sansad V |
175000 |
Const of RO and UV tretment unit of water at sansad V1 |
Plinth level |
-
latitude : 22.5346715
Longitude : 87.9116287
file name : Image_29032023154703969.png
|
2023-03-29 15:47:04.071073 |
316 |
56379571 |
Const of RO and UV tretment unit of water at sansad V |
175000 |
Const of RO and UV tretment unit of water at sansad V1 |
Completion of work |
-
latitude : 22.5346721
Longitude : 87.911634
file name : Image_29032023154449260.png
|
2023-03-29 15:44:49.368885 |
317 |
47518862 |
Extension of pipeline for drinkingwater from Mankur Ganapati Pradhan hou to Ashis Samanta hou |
1500000 |
Extension of pipeline for drinkingwater from Mankur Ganapati Pradhan hou to Ashis Samanta hou1 |
Roof laid |
-
latitude : 22.51238618977368,22.512340173125267
Longitude : 87.89615898393095,87.89606762118638
file name : Image_01022023141723075.png
|
2023-02-01 14:17:23.177327 |
318 |
47518862 |
Extension of pipeline for drinkingwater from Mankur Ganapati Pradhan hou to Ashis Samanta hou |
1500000 |
Extension of pipeline for drinkingwater from Mankur Ganapati Pradhan hou to Ashis Samanta hou1 |
Roof laid |
-
latitude : 22.512439121492207,22.51237403601408
Longitude : 87.89609620347619,87.8961770888418
file name : Image_01022023141507531.png
|
2023-02-01 14:15:07.62861 |
319 |
47518862 |
Extension of pipeline for drinkingwater from Mankur Ganapati Pradhan hou to Ashis Samanta hou |
1500000 |
Extension of pipeline for drinkingwater from Mankur Ganapati Pradhan hou to Ashis Samanta hou1 |
Plinth level |
-
latitude : 22.512361337430775,22.51242776401341
Longitude : 87.89616895839572,87.89619175717235
file name : Image_01022023141129255.png
|
2023-02-01 14:11:29.355681 |
320 |
47518862 |
Extension of pipeline for drinkingwater from Mankur Ganapati Pradhan hou to Ashis Samanta hou |
1500000 |
Extension of pipeline for drinkingwater from Mankur Ganapati Pradhan hou to Ashis Samanta hou1 |
Completion of work |
-
latitude : 22.5122763030231,22.512329150922596
Longitude : 87.8962238598615,87.8961873985827
file name : Image_01022023140546481.png
|
2023-02-01 14:05:46.577211 |
321 |
66319946 |
Const of PCC road from Bholser Market to Uttar Malia |
324523 |
Const of PCC road from Bholser Market to Uttar Malia1 |
Plinth level |
-
latitude : 22.53143905196339,22.531422707252204
Longitude : 87.91360172443092,87.91359250433743
file name : Image_24052023154225654.png
|
2023-05-24 15:42:25.742622 |
322 |
66319946 |
Const of PCC road from Bholser Market to Uttar Malia |
324523 |
Const of PCC road from Bholser Market to Uttar Malia1 |
Completion of work |
-
latitude : 22.53148284740746,22.531452421098948
Longitude : 87.91363785043359,87.913615135476
file name : Image_24052023153916297.png
|
2023-05-24 15:39:16.385897 |
323 |
56379634 |
Drinkiater water supply from house to house by sub mersible pump at sansad II |
211272 |
Drinkiater water supply from house to house by sub mersible pump at sansad II1 |
Plinth level |
-
latitude : 22.531695161014795,22.531695161014795
Longitude : 87.90172976441681,87.90172976441681
file name : Image_06062023160718212.png
|
2023-06-06 16:07:18.308621 |
324 |
56379634 |
Drinkiater water supply from house to house by sub mersible pump at sansad II |
211272 |
Drinkiater water supply from house to house by sub mersible pump at sansad II1 |
Completion of work |
-
latitude : 22.531695161014795,22.531695161014795
Longitude : 87.90172976441681,87.90172976441681
file name : Image_06062023160418492.png
|
2023-06-06 16:04:18.58027 |
325 |
56393067 |
Drinking water supply from house to house by sub mersible pump at sansad VI |
211272 |
Drinking water supply from house to house by sub mersible pump at sansad VI1 |
Plinth level |
-
latitude : 22.5265702,22.526082135736942
Longitude : 87.8981813,87.89764232933521
file name : Image_06062023161809500.png
|
2023-06-06 16:18:09.593718 |
326 |
56393067 |
Drinking water supply from house to house by sub mersible pump at sansad VI |
211272 |
Drinking water supply from house to house by sub mersible pump at sansad VI1 |
Completion of work |
-
latitude : 22.526562,22.5261316
Longitude : 87.8981869,87.8969046
file name : Image_06062023161514424.png
|
2023-06-06 16:15:14.519609 |
327 |
56392594 |
Drinking water supply from house to house by sub mersible pump at sansad XV |
211272 |
Drinking water supply from house to house by sub mersible pump at sansad XV1 |
Roof laid |
-
latitude : 22.5113047,22.5113048
Longitude : 87.8987198,87.8987204
file name : Image_17072023163942144.png
|
2023-07-17 16:39:42.230207 |
328 |
56392594 |
Drinking water supply from house to house by sub mersible pump at sansad XV |
211272 |
Drinking water supply from house to house by sub mersible pump at sansad XV1 |
Plinth level |
-
latitude : 22.5113046,22.5113046
Longitude : 87.89872,87.8987199
file name : Image_17072023163628602.png
|
2023-07-17 16:36:28.722127 |
329 |
56392594 |
Drinking water supply from house to house by sub mersible pump at sansad XV |
211272 |
Drinking water supply from house to house by sub mersible pump at sansad XV1 |
Completion of work |
-
latitude : 22.5112957,22.5112843
Longitude : 87.8987294,87.8986851
file name : Image_17072023163009865.png
|
2023-07-17 16:30:09.964104 |
330 |
56393378 |
Drinking water supply from house to house by sub mersible pump at sansad XVII |
211272 |
Drinking water supply from house to house by sub mersible pump at sansad XVII1 |
Roof laid |
-
latitude : 22.50956299714744,22.50960440374911
Longitude : 87.89535658434033,87.89541073143482
file name : Image_17072023165550841.png
|
2023-07-17 16:55:50.925004 |
331 |
56393378 |
Drinking water supply from house to house by sub mersible pump at sansad XVII |
211272 |
Drinking water supply from house to house by sub mersible pump at sansad XVII1 |
Plinth level |
-
latitude : 22.509509520605206,22.509524398483336
Longitude : 87.89530369453132,87.8952637128532
file name : Image_17072023165319527.png
|
2023-07-17 16:53:19.609086 |
332 |
56393378 |
Drinking water supply from house to house by sub mersible pump at sansad XVII |
211272 |
Drinking water supply from house to house by sub mersible pump at sansad XVII1 |
Completion of work |
-
latitude : 22.509588059037924,22.509592627175152
Longitude : 87.89537787437439,87.8953414130956
file name : Image_17072023164847699.png
|
2023-07-17 16:48:47.55573 |
333 |
56392361 |
Drinking water supply from house to house by sub mersible pump at sansad ix |
211272 |
Drinking water supply from house to house by sub mersible pump at sansad ix1 |
Roof laid |
-
latitude : 22.522143102250993,22.522143102250993
Longitude : 87.89514963515103,87.89514963515103
file name : Image_17072023171525636.png
|
2023-07-17 17:15:25.809225 |
334 |
56392361 |
Drinking water supply from house to house by sub mersible pump at sansad ix |
211272 |
Drinking water supply from house to house by sub mersible pump at sansad ix1 |
Plinth level |
-
latitude : 22.52212390769273,22.522181156091392
Longitude : 87.8951202146709,87.89514016360044
file name : Image_17072023171213837.png
|
2023-07-17 17:12:13.986157 |
335 |
56392361 |
Drinking water supply from house to house by sub mersible pump at sansad ix |
211272 |
Drinking water supply from house to house by sub mersible pump at sansad ix1 |
Completion of work |
-
latitude : 22.522115190513432,22.522192974574864
Longitude : 87.89511342532933,87.89517251774669
file name : Image_17072023170955420.png
|
2023-07-17 17:09:55.531813 |