1 |
47662572 |
Installation of Solar Light near JB Market at sansad XIV |
30000 |
Installation of Solar Light near JB Market at sansad XIV1 |
Completion of work |
-
latitude : 26.85610341
Longitude : 89.38026546
file name : Image_24032023164827675.png
|
2023-03-24 16:48:27.800556 |
2 |
47663118 |
Installation of Solar Light near Bikash Sewa House at sansad XIV |
30000 |
Installation of Solar Light near Bikash Sewa House at sansad XIV1 |
Completion of work |
-
latitude : 26.85624898
Longitude : 89.37849609
file name : Image_24032023170446846.png
|
2023-03-24 17:04:47.031537 |
3 |
47663337 |
Installation of Solar Light near Purnima Bardewa House at sansad XIV |
30000 |
Installation of Solar Light near Purnima Bardewa House at sansad XIV1 |
Completion of work |
-
latitude : 26.85570809
Longitude : 89.37925798
file name : Image_24032023171124246.png
|
2023-03-24 17:11:24.307346 |
4 |
77658964 |
INSTALLATION OF SOLAR LIGHT NEAR MOJAFFAR HOSSAIN HOUSE |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR MOJAFFAR HOSSAIN HOUSE1 |
Completion of work |
-
latitude : 26.8607582
Longitude : 89.3759898
file name : Image_26062023171115805.png
|
2023-06-26 17:11:15.885105 |
5 |
35124563 |
CC ROAD FROM JARINA HOUSE TO OBED HOUSE |
284032 |
CC ROAD FROM JARINA HOUSE TO OBED HOUSE1 |
Completion of work |
-
latitude : 26.8552406,26.8557692,26.8557692
Longitude : 89.3746978,89.374326,89.374326
file name : Image_29092021155402993.png
|
2021-09-29 15:54:03.090089 |
6 |
35124563 |
CC ROAD FROM JARINA HOUSE TO OBED HOUSE |
284032 |
CC ROAD FROM JARINA HOUSE TO OBED HOUSE1 |
Completion of work |
-
latitude : 26.85607278,26.85607301,26.85607286
Longitude : 89.37428024,89.37427984,89.37427993
file name : Image_12082021094351142.png
|
2021-08-12 09:43:51.29657 |
7 |
35124563 |
CC ROAD FROM JARINA HOUSE TO OBED HOUSE |
284032 |
CC ROAD FROM JARINA HOUSE TO OBED HOUSE1 |
Completion of work |
-
latitude : 26.8557245,26.8557245
Longitude : 89.3743113,89.3743113
file name : Image_02072021163121372.png
|
2021-07-02 16:31:21.506876 |
8 |
47663716 |
Installation of Solar Light near Saraswati Sha House at sansad XIV |
30000 |
Installation of Solar Light near Saraswati Sha House at sansad XIV1 |
Completion of work |
-
latitude : 26.8563657
Longitude : 89.3794354
file name : Image_24032023165545726.png
|
2023-03-24 16:55:45.84783 |
9 |
77659848 |
INSTALLATION OF SOLAR LIGHT NEAR SARAN BISWAKARMA |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR SARAN BISWAKARMA1 |
Completion of work |
-
latitude : 26.8601136
Longitude : 89.3732778
file name : Image_26062023171027061.png
|
2023-06-26 17:10:27.134468 |
10 |
47622427 |
Contraction of PCC Drain from Janardhan Mandal House to Shyam Sharma House at Sansad I |
337716 |
Contraction of PCC Drain from Janardhan Mandal House to Shyam Sharma House at Sansad I1 |
Completion of work |
-
latitude : 26.8599346,26.85993426,26.85993426
Longitude : 89.37993372,89.37993348,89.37993348
file name : Image_17022023215121099.png
|
2023-02-17 21:51:21.181888 |
11 |
36213202 |
HIGH DRAIN BINOD LAMA TO KURBAN ANSARI |
349604 |
HIGH DRAIN BINOD LAMA TO KURBAN ANSARI1 |
Plinth level |
-
latitude : 26.8606985,26.8606985
Longitude : 89.3759556,89.3759556
file name : Image_20012022141810726.png
|
2022-01-20 14:18:10.794088 |
12 |
36213202 |
HIGH DRAIN BINOD LAMA TO KURBAN ANSARI |
349604 |
HIGH DRAIN BINOD LAMA TO KURBAN ANSARI1 |
Plinth level |
-
latitude : 26.8578855,26.8578836
Longitude : 89.3745032,89.3745045
file name : Image_20122021162633435.png
|
2021-12-20 16:26:33.562893 |
13 |
36213202 |
HIGH DRAIN BINOD LAMA TO KURBAN ANSARI |
349604 |
HIGH DRAIN BINOD LAMA TO KURBAN ANSARI1 |
Completion of work |
-
latitude : 26.8576088,26.8576088
Longitude : 89.3737932,89.3737932
file name : Image_02112021165558640.png
|
2021-11-02 16:55:58.743492 |
14 |
36215854 |
HIGH DRAIN FROM BISHNU DUTTA TO SHANKAR DAS |
336550 |
HIGH DRAIN FROM BISHNU DUTTA TO SHANKAR DAS1 |
Plinth level |
-
latitude : 26.8607669,26.8607669
Longitude : 89.3808228,89.3808228
file name : Image_31122021160525443.png
|
2021-12-31 16:05:25.543333 |
15 |
36215854 |
HIGH DRAIN FROM BISHNU DUTTA TO SHANKAR DAS |
336550 |
HIGH DRAIN FROM BISHNU DUTTA TO SHANKAR DAS1 |
Plinth level |
-
latitude : 26.8607046,26.8607046
Longitude : 89.3757338,89.3757338
file name : Image_26112021140928374.png
|
2021-11-26 14:09:28.464301 |
16 |
36215854 |
HIGH DRAIN FROM BISHNU DUTTA TO SHANKAR DAS |
336550 |
HIGH DRAIN FROM BISHNU DUTTA TO SHANKAR DAS1 |
Completion of work |
-
latitude : 26.8606988,26.8606988,26.8606988
Longitude : 89.3759753,89.3759753,89.3759753
file name : Image_09112021164138615.png
|
2021-11-09 16:41:38.725453 |
17 |
36230545 |
PCC DRAIN FROM ARJUN BISWAKARMA TO BANWARI JAISWAL |
288533 |
PCC DRAIN FROM ARJUN BISWAKARMA TO BANWARI JAISWAL1 |
Roof laid |
-
latitude : 26.8574846,26.8574846
Longitude : 89.3795596,89.3795596
file name : Image_22022022140235341.png
|
2022-02-22 14:02:35.440134 |
18 |
36230545 |
PCC DRAIN FROM ARJUN BISWAKARMA TO BANWARI JAISWAL |
288533 |
PCC DRAIN FROM ARJUN BISWAKARMA TO BANWARI JAISWAL1 |
Plinth level |
-
latitude : 26.857429,26.857429,26.857429
Longitude : 89.379522,89.379522,89.379522
file name : Image_11022022143755054.png
|
2022-02-11 14:37:55.154942 |
19 |
36230545 |
PCC DRAIN FROM ARJUN BISWAKARMA TO BANWARI JAISWAL |
288533 |
PCC DRAIN FROM ARJUN BISWAKARMA TO BANWARI JAISWAL1 |
Completion of work |
-
latitude : 26.8586572,26.8586572,26.8586572
Longitude : 89.38385227,89.38385227,89.38385227
file name : Image_31012022143357609.png
|
2022-01-31 14:33:57.702738 |
20 |
47686840 |
Installation of Solar Light near Kali Mandir at Sansad XV |
30000 |
Installation of Solar Light near Kali Mandir at Sansad XV1 |
Completion of work |
-
latitude : 26.8555996
Longitude : 89.3726249
file name : Image_08062023171317921.png
|
2023-06-08 17:13:18.005673 |
21 |
47687618 |
Installation of Solar Light near Abdullah Mia house at Sansad XV |
30000 |
Installation of Solar Light near Abdullah Mia house at Sansad XV1 |
Completion of work |
-
latitude : 26.85548034
Longitude : 89.37370714
file name : Image_08062023170757975.png
|
2023-06-08 17:07:58.054584 |
22 |
36227848 |
PCC ROAD FROM THE HOUSE OF JOYDEV TO THE HOUSE OF SHYAM SUNDAR SHARMA |
284891 |
PCC ROAD FROM THE HOUSE OF JOYDEV TO THE HOUSE OF SHYAM SUNDAR SHARMA 1 |
Roof laid |
-
latitude : 26.8528326,26.8528326,26.8528326
Longitude : 89.3805812,89.3805812,89.3805812
file name : Image_25022022155108634.png
|
2022-02-25 15:51:08.76125 |
23 |
36227848 |
PCC ROAD FROM THE HOUSE OF JOYDEV TO THE HOUSE OF SHYAM SUNDAR SHARMA |
284891 |
PCC ROAD FROM THE HOUSE OF JOYDEV TO THE HOUSE OF SHYAM SUNDAR SHARMA 1 |
Plinth level |
-
latitude : 26.85308683,26.85308683,26.85308329
Longitude : 89.38074926,89.38074926,89.38074984
file name : Image_09022022144448851.png
|
2022-02-09 14:44:49.007048 |
24 |
36227848 |
PCC ROAD FROM THE HOUSE OF JOYDEV TO THE HOUSE OF SHYAM SUNDAR SHARMA |
284891 |
PCC ROAD FROM THE HOUSE OF JOYDEV TO THE HOUSE OF SHYAM SUNDAR SHARMA 1 |
Completion of work |
-
latitude : 26.8527147,26.8527147
Longitude : 89.3809198,89.3809198
file name : Image_31012022144726059.png
|
2022-01-31 14:47:26.167125 |
25 |
34952050 |
PCC DRAIN FROM MAYA THAPA HOUSE TO SAMBHU BAITHA HOUSE |
286512 |
PCC DRAIN FROM MAYA THAPA HOUSE TO SAMBHU BAITHA HOUSE 1 |
Roof laid |
-
latitude : 26.8549889,26.8549889,26.8549889
Longitude : 89.3799753,89.3799753,89.3799753
file name : Image_25022022172319660.png
|
2022-02-25 17:23:19.734509 |
26 |
34952050 |
PCC DRAIN FROM MAYA THAPA HOUSE TO SAMBHU BAITHA HOUSE |
286512 |
PCC DRAIN FROM MAYA THAPA HOUSE TO SAMBHU BAITHA HOUSE 1 |
Plinth level |
-
latitude : 26.8550011,26.8550011
Longitude : 89.3799527,89.3799527
file name : Image_25022022154532675.png
|
2022-02-25 15:45:32.791645 |
27 |
34952050 |
PCC DRAIN FROM MAYA THAPA HOUSE TO SAMBHU BAITHA HOUSE |
286512 |
PCC DRAIN FROM MAYA THAPA HOUSE TO SAMBHU BAITHA HOUSE 1 |
Plinth level |
-
latitude : 26.8527973,26.8527973,26.8527973
Longitude : 89.3800818,89.3800818,89.3800818
file name : Image_22022022154358996.png
|
2022-02-22 15:43:59.07478 |
28 |
34952050 |
PCC DRAIN FROM MAYA THAPA HOUSE TO SAMBHU BAITHA HOUSE |
286512 |
PCC DRAIN FROM MAYA THAPA HOUSE TO SAMBHU BAITHA HOUSE 1 |
Completion of work |
-
latitude : 26.8549689,26.8549689,26.8549689
Longitude : 89.3800335,89.3800335,89.3800335
file name : Image_31012022152709969.png
|
2022-01-31 15:27:10.07459 |
29 |
35126101 |
CC ROAD FROM ATIYAR HOUSE TO MAIN ROAD |
320051 |
CC ROAD FROM ATIYAR HOUSE TO MAIN ROAD 1 |
Roof laid |
-
latitude : 26.8524738,26.8524738,26.8524738
Longitude : 89.3800112,89.3800112,89.3800112
file name : Image_25022022172911074.png
|
2022-02-25 17:29:11.175767 |
30 |
35126101 |
CC ROAD FROM ATIYAR HOUSE TO MAIN ROAD |
320051 |
CC ROAD FROM ATIYAR HOUSE TO MAIN ROAD 1 |
Plinth level |
-
latitude : 26.852528,26.852528
Longitude : 89.3799556,89.3799556
file name : Image_25022022164254556.png
|
2022-02-25 16:42:54.627218 |
31 |
35126101 |
CC ROAD FROM ATIYAR HOUSE TO MAIN ROAD |
320051 |
CC ROAD FROM ATIYAR HOUSE TO MAIN ROAD 1 |
Plinth level |
-
latitude : 26.8525479,26.8525479
Longitude : 89.3799357,89.3799357
file name : Image_22022022154355828.png
|
2022-02-22 15:43:55.920817 |
32 |
35126101 |
CC ROAD FROM ATIYAR HOUSE TO MAIN ROAD |
320051 |
CC ROAD FROM ATIYAR HOUSE TO MAIN ROAD 1 |
Completion of work |
-
latitude : 26.8525201,26.8525201,26.8525162
Longitude : 89.3799786,89.3799786,89.3799707
file name : Image_31012022143734751.png
|
2022-01-31 14:37:34.845506 |
33 |
48764235 |
Construction of Paver Block beside the proposed shopping complex at the land of GP Office |
321653 |
Construction of Paver Block beside the proposed shopping complex at the land of GP Office1 |
Plinth level |
-
latitude : 26.8553115,26.8553115,26.8553115
Longitude : 89.3757703,89.3757703,89.3757703
file name : Image_29062022161225864.png
|
2022-06-29 16:12:25.937904 |
34 |
48764235 |
Construction of Paver Block beside the proposed shopping complex at the land of GP Office |
321653 |
Construction of Paver Block beside the proposed shopping complex at the land of GP Office1 |
Completion of work |
-
latitude : 26.8553411,26.855385,26.855385
Longitude : 89.375659,89.3783033,89.3783033
file name : Image_10052022175749783.png
|
2022-05-10 17:57:49.897471 |
35 |
48763315 |
Construction of Shopping Complex at the land of GP Office |
1029397 |
Construction of Shopping Complex at the land of GP Office1 |
Plinth level |
-
latitude : 26.85531938
Longitude : 89.37559567
file name : Image_11052022163013254.png
|
2022-05-11 16:30:13.362512 |
36 |
48763315 |
Construction of Shopping Complex at the land of GP Office |
1029397 |
Construction of Shopping Complex at the land of GP Office1 |
Completion of work |
-
latitude : 26.8553013
Longitude : 89.3758091
file name : Image_06052022182048393.png
|
2022-05-06 18:20:48.480762 |
37 |
47624465 |
Installation of Sanitary Pad Vending Machine with Disposal |
77000 |
Installation of Sanitary Pad Vending Machine with Disposal 1 |
Roof laid |
-
latitude : 26.8552773
Longitude : 89.3758695
file name : Image_06082024151035507.png
|
2024-08-06 15:10:35.616373 |
38 |
47624465 |
Installation of Sanitary Pad Vending Machine with Disposal |
77000 |
Installation of Sanitary Pad Vending Machine with Disposal 1 |
Roof laid |
-
latitude : 26.8552773
Longitude : 89.3758695
file name : Image_06082024151040804.png
|
2024-08-06 15:10:40.927316 |
39 |
47624465 |
Installation of Sanitary Pad Vending Machine with Disposal |
77000 |
Installation of Sanitary Pad Vending Machine with Disposal 1 |
Plinth level |
-
latitude : 26.85518541
Longitude : 89.37590348
file name : Image_14122022221309674.png
|
2022-12-14 22:13:09.743824 |
40 |
47624465 |
Installation of Sanitary Pad Vending Machine with Disposal |
77000 |
Installation of Sanitary Pad Vending Machine with Disposal 1 |
Plinth level |
-
latitude : 26.8552765
Longitude : 89.3758363
file name : Image_14122022221334961.png
|
2022-12-14 22:13:35.020952 |
41 |
47624465 |
Installation of Sanitary Pad Vending Machine with Disposal |
77000 |
Installation of Sanitary Pad Vending Machine with Disposal 1 |
Plinth level |
-
latitude : 26.85518541
Longitude : 89.37590348
file name : Image_14122022221355053.png
|
2022-12-14 22:13:55.124566 |
42 |
47624465 |
Installation of Sanitary Pad Vending Machine with Disposal |
77000 |
Installation of Sanitary Pad Vending Machine with Disposal 1 |
Roof laid |
-
latitude : 26.8552486
Longitude : 89.3758353
file name : Image_22122022171033453.png
|
2022-12-22 17:10:33.5101 |
43 |
47624465 |
Installation of Sanitary Pad Vending Machine with Disposal |
77000 |
Installation of Sanitary Pad Vending Machine with Disposal 1 |
Completion of work |
-
latitude : 26.8552834
Longitude : 89.375824
file name : Image_12122022185351119.png
|
2022-12-12 18:53:51.206544 |
44 |
47694532 |
Construction of PCC Road from Tapan Pandey to Paran House at Sansad VI |
99274 |
Construction of PCC Road from Tapan Pandey to Paran House at Sansad VI1 |
Completion of work |
-
latitude : 26.8552043,26.8552043,26.8552043,26.8552043
Longitude : 89.382781,89.382781,89.382781,89.382781
file name : Image_14082023162244828.png
|
2023-08-14 16:22:44.909056 |
45 |
47628057 |
Installation of Solar Light near Mangal Singh House at Sansad No VI |
35018 |
Installation of Solar Light near Mangal Singh House at Sansad No VI1 |
Completion of work |
-
latitude : 26.8578253
Longitude : 89.3764745
file name : Image_29122022160010386.png
|
2022-12-29 16:00:10.480213 |
46 |
47628327 |
Installation of Solar Light near Ajit Roy House at Sansad VI |
35018 |
Installation of Solar Light near Ajit Roy House at Sansad VI1 |
Completion of work |
-
latitude : 26.85693007
Longitude : 89.3769381
file name : Image_29122022153943079.png
|
2022-12-29 15:39:43.172824 |
47 |
47627995 |
Installation of Solar Light near Nitai Das House at Sansad VI |
35018 |
Installation of Solar Light near Nitai Das House at Sansad VI1 |
Completion of work |
-
latitude : 26.85724562
Longitude : 89.37678487
file name : Image_29122022160847532.png
|
2022-12-29 16:08:47.613597 |
48 |
47625414 |
Installation of Solar Light near Satyaranjan Paul house at Sansad IV |
35018 |
Installation of Solar Light near Satyaranjan Paul house at Sansad IV1 |
Completion of work |
-
latitude : 26.85699713
Longitude : 89.37217776
file name : Image_10012023133449056.png
|
2023-01-10 13:34:49.165135 |
49 |
47706388 |
Installation of Solar Light near Ganesh Pradhan House at sansad XXI |
35018 |
Installation of Solar Light near Ganesh Pradhan House at sansad XXI1 |
Completion of work |
-
latitude : 26.85601532
Longitude : 89.38257759
file name : Image_05012023160043290.png
|
2023-01-05 16:00:43.389256 |
50 |
47706277 |
Installation of Solar Light near Meera Gupta House at Sansad XXI |
35018 |
Installation of Solar Light near Meera Gupta House at Sansad XXI1 |
Completion of work |
-
latitude : 26.85456785
Longitude : 89.38254793
file name : Image_03012023163848773.png
|
2023-01-03 16:38:48.880364 |
51 |
47692828 |
Installation of Solar Light near Ratna bahadur tamang House at sansad XX |
35018 |
Installation of Solar Light near Ratna bahadur tamang House at sansad XX1 |
Completion of work |
-
latitude : 26.85537454
Longitude : 89.38223372
file name : Image_03012023163348292.png
|
2023-01-03 16:33:48.387392 |
52 |
47692074 |
Installation of Solar light near Ganga House at sansad XX |
35018 |
Installation of Solar light near Ganga House at sansad XX1 |
Completion of work |
-
latitude : 26.8577368
Longitude : 89.38382403
file name : Image_05012023155100803.png
|
2023-01-05 15:51:00.897872 |
53 |
47692682 |
Installation of Solar Light near Radha Debi Das at sansad XX |
35018 |
Installation of Solar Light near Radha Debi Das at sansad XX1 |
Completion of work |
-
latitude : 26.85695312
Longitude : 89.38303763
file name : Image_05012023154353404.png
|
2023-01-05 15:43:53.52117 |
54 |
47692492 |
Installation of Solar Light near Sita Chhetri House at sansad XX |
35018 |
Installation of Solar Light near Sita Chhetri House at sansad XX1 |
Completion of work |
-
latitude : 26.85695905
Longitude : 89.38193273
file name : Image_05012023153720555.png
|
2023-01-05 15:37:20.650212 |
55 |
47691659 |
Installation of Solar Light near Sher Bahadur Lama House at sansad XIX |
35018 |
Installation of Solar Light near Sher Bahadur Lama House at sansad XIX1 |
Completion of work |
-
latitude : 26.8589111
Longitude : 89.3819565
file name : Image_28122022154202666.png
|
2022-12-28 15:42:02.746682 |
56 |
47691295 |
Installation of Solar Light near Nima Sherpa House at sansad XIX |
35018 |
Installation of Solar Light near Nima Sherpa House at sansad XIX1 |
Completion of work |
-
latitude : 26.8539522
Longitude : 89.37491769
file name : Image_28122022153337939.png
|
2022-12-28 15:33:38.019517 |
57 |
47691480 |
Installation of Solar Light near Sanju Sarki House at sansad XIX |
35018 |
Installation of Solar Light near Sanju Sarki House at sansad XIX1 |
Completion of work |
-
latitude : 26.8596155
Longitude : 89.38195749
file name : Image_28122022153835251.png
|
2022-12-28 15:38:35.337844 |
58 |
47706174 |
Installation of Solar Light near Iman Singh Tamang House at sansad XVII |
35018 |
Installation of Solar Light near Iman Singh Tamang House at sansad XVII1 |
Completion of work |
-
latitude : 26.8515483
Longitude : 89.3842601
file name : Image_30122022165153305.png
|
2022-12-30 16:51:53.420215 |
59 |
47706063 |
Installation of Solar Light near Manoyara house at Jharna Busty at sansad XVII |
35018 |
Installation of Solar Light near Manoyara house at Jharna Busty at sansad XVII1 |
Completion of work |
-
latitude : 26.85350582
Longitude : 89.38298518
file name : Image_30122022164317436.png
|
2022-12-30 16:43:17.532699 |
60 |
47706063 |
Installation of Solar Light near Manoyara house at Jharna Busty at sansad XVII |
35018 |
Installation of Solar Light near Manoyara house at Jharna Busty at sansad XVII1 |
Completion of work |
-
latitude : 26.85352738
Longitude : 89.38302063
file name : Image_30122022164323424.png
|
2022-12-30 16:43:23.518929 |
61 |
47705814 |
Installation of Solar light near Gopa Thapa House at Jharna Busty |
35018 |
Installation of Solar light near Gopa Thapa House at Jharna Busty1 |
Completion of work |
-
latitude : 26.8560644
Longitude : 89.3844414
file name : Image_03012023151447920.png
|
2023-01-03 15:14:47.998507 |
62 |
47705921 |
Installation of Solar Light near Jannat Bibi House at Jharna Busty at sansad XVII |
35018 |
Installation of Solar Light near Jannat Bibi House at Jharna Busty at sansad XVII1 |
Completion of work |
-
latitude : 26.8546782
Longitude : 89.38463
file name : Image_30122022172624485.png
|
2022-12-30 17:26:24.568213 |
63 |
47705921 |
Installation of Solar Light near Jannat Bibi House at Jharna Busty at sansad XVII |
35018 |
Installation of Solar Light near Jannat Bibi House at Jharna Busty at sansad XVII1 |
Completion of work |
-
latitude : 26.8546782
Longitude : 89.38463
file name : Image_30122022172630743.png
|
2022-12-30 17:26:30.821636 |
64 |
47705693 |
Installation of Solar Light near Mamina Bibi House at sansad XVII |
35018 |
Installation of Solar Light near Mamina Bibi House at sansad XVII1 |
Completion of work |
-
latitude : 26.8525592
Longitude : 89.3839667
file name : Image_30122022170034217.png
|
2022-12-30 17:00:34.321754 |
65 |
47688426 |
Installation of Solar Light near Tilak Thapa House at sansad XVI |
35018 |
Installation of Solar Light near Tilak Thapa House at sansad XVI1 |
Completion of work |
-
latitude : 26.85218953
Longitude : 89.37901159
file name : Image_30122022145139624.png
|
2022-12-30 14:51:39.718563 |
66 |
47688426 |
Installation of Solar Light near Tilak Thapa House at sansad XVI |
35018 |
Installation of Solar Light near Tilak Thapa House at sansad XVI1 |
Completion of work |
-
latitude : 26.85217801
Longitude : 89.37902144
file name : Image_30122022160158333.png
|
2022-12-30 16:01:58.409827 |
67 |
47688613 |
Installation of Solar Light near Ram Bahadur House at sansad XVI |
35018 |
Installation of Solar Light near Ram Bahadur House at sansad XVI1 |
Completion of work |
-
latitude : 26.8537523
Longitude : 89.38094265
file name : Image_30122022144006650.png
|
2022-12-30 14:40:06.737799 |
68 |
47687826 |
Installation of Solar Light near Damray Tamang House at sansad XVI |
35018 |
Installation of Solar Light near Damray Tamang House at sansad XVI1 |
Completion of work |
-
latitude : 26.8532183
Longitude : 89.38096061
file name : Image_30122022143422446.png
|
2022-12-30 14:34:22.532011 |
69 |
47687063 |
Installation of Solar Light near Md Asraf Mia House at Sansad XV |
35018 |
Installation of Solar Light near Md Asraf Mia House at Sansad XV1 |
Completion of work |
-
latitude : 26.85540765
Longitude : 89.37587201
file name : Image_03012023151451408.png
|
2023-01-03 15:14:51.489355 |
70 |
47687433 |
Installation of Solar Light near Health Sub Center at sansad XV |
35018 |
Installation of Solar Light near Health Sub Center at sansad XV1 |
Completion of work |
-
latitude : 26.85200438
Longitude : 89.38233297
file name : Image_03012023151833289.png
|
2023-01-03 15:18:33.367728 |
71 |
47687240 |
Installation of Solar Light near Kumar Rai House at sansad XV |
35018 |
Installation of Solar Light near Kumar Rai House at sansad XV1 |
Completion of work |
-
latitude : 26.85067476
Longitude : 89.3808859
file name : Image_03012023152345010.png
|
2023-01-03 15:23:45.108544 |
72 |
47662027 |
Installation of Solar Light near Jesu Lama House at sansad XIII |
35018 |
Installation of Solar Light near Jesu Lama House at sansad XIII1 |
Completion of work |
-
latitude : 26.8515216
Longitude : 89.3773669
file name : Image_28122022141953063.png
|
2022-12-28 14:19:53.168831 |
73 |
47662378 |
Installation of Solar Light near Kiran Lama House at sansad XIII |
35018 |
Installation of Solar Light near Kiran Lama House at sansad XIII1 |
Completion of work |
-
latitude : 26.8539085
Longitude : 89.3748646
file name : Image_28122022143615906.png
|
2022-12-28 14:36:16.001867 |
74 |
47661791 |
Installation of Solar Light near Khagen Mama House at sansad XIII |
35018 |
Installation of Solar Light near Khagen Mama House at sansad XIII1 |
Completion of work |
-
latitude : 26.8518317
Longitude : 89.3775785
file name : Image_28122022141507254.png
|
2022-12-28 14:15:07.351822 |
75 |
47661631 |
Installation of Solar Light near Binod Chhetri House at sansad XIII |
35018 |
Installation of Solar Light near Binod Chhetri House at sansad XIII1 |
Completion of work |
-
latitude : 26.8527063
Longitude : 89.3750751
file name : Image_28122022142718813.png
|
2022-12-28 14:27:18.915359 |
76 |
47705242 |
Installation of Solar Light near Reena Karmakar House at sansad XII |
35018 |
Installation of Solar Light near Reena Karmakar House at sansad XII1 |
Completion of work |
-
latitude : 26.85752725
Longitude : 89.37821022
file name : Image_13012023165511821.png
|
2023-01-13 16:55:11.912107 |
77 |
47705587 |
Installation of Solar Light near Kamalesh House at sansad XII |
35018 |
Installation of Solar Light near Kamalesh House at sansad XII1 |
Completion of work |
-
latitude : 26.8576247
Longitude : 89.38012877
file name : Image_13012023163135166.png
|
2023-01-13 16:31:35.262439 |
78 |
47705366 |
Installation of Solar Light near Naresh Sha house at sansad XII |
35018 |
Installation of Solar Light near Naresh Sha house at sansad XII1 |
Completion of work |
-
latitude : 26.85531457
Longitude : 89.37591395
file name : Image_13012023162450613.png
|
2023-01-13 16:24:50.699835 |
79 |
47660719 |
Installation of Solar Light near Bablu Agarwal House at Sansad XI |
35018 |
Installation of Solar Light near Bablu Agarwal House at Sansad XI1 |
Completion of work |
-
latitude : 26.85918605
Longitude : 89.37679585
file name : Image_29122022170012591.png
|
2022-12-29 17:00:12.703622 |
80 |
47660140 |
Installation of Solar Light near Babu Hossain House at sansad XI |
35018 |
Installation of Solar Light near Babu Hossain House at sansad XI1 |
Completion of work |
-
latitude : 26.85865835
Longitude : 89.37628705
file name : Image_29122022165356573.png
|
2022-12-29 16:53:56.675235 |
81 |
47660328 |
Installation of Solar Light near Rita Oraon House at sansad XI |
35018 |
Installation of Solar Light near Rita Oraon House at sansad XI1 |
Completion of work |
-
latitude : 26.85855242
Longitude : 89.37742606
file name : Image_29122022170619139.png
|
2022-12-29 17:06:19.207818 |
82 |
47658991 |
Installation of Solar Light near Kali Bari at Sansad X |
35018 |
Installation of Solar Light near Kali Bari at Sansad X1 |
Completion of work |
-
latitude : 26.85496988
Longitude : 89.37222908
file name : Image_29122022150346821.png
|
2022-12-29 15:03:46.89214 |
83 |
47659775 |
Installation of Solar Light near Majibul House at Sansad X |
35018 |
Installation of Solar Light near Majibul House at Sansad X1 |
Completion of work |
-
latitude : 26.85433057
Longitude : 89.37296825
file name : Image_29122022150541239.png
|
2022-12-29 15:05:41.327721 |
84 |
47659600 |
Installation of Solar Light near Rahim Mia House at Sansad X |
35018 |
Installation of Solar Light near Rahim Mia House at Sansad X1 |
Completion of work |
-
latitude : 26.85518393
Longitude : 89.37313609
file name : Image_29122022150342923.png
|
2022-12-29 15:03:43.019577 |
85 |
47658295 |
Installation of Solar Light near Step Siri at Sansad IX |
35018 |
Installation of Solar Light near Step Siri at Sansad IX1 |
Completion of work |
-
latitude : 26.85422278
Longitude : 89.37314068
file name : Image_29122022150544503.png
|
2022-12-29 15:05:44.57399 |
86 |
47658295 |
Installation of Solar Light near Step Siri at Sansad IX |
35018 |
Installation of Solar Light near Step Siri at Sansad IX1 |
Completion of work |
-
latitude : 26.85422327
Longitude : 89.373251
file name : Image_29122022151251224.png
|
2022-12-29 15:12:51.302053 |
87 |
47658114 |
Installation of Solar Light near Nesraf House at Sansad IX |
35018 |
Installation of Solar Light near Nesraf House at Sansad IX1 |
Completion of work |
-
latitude : 26.85301124
Longitude : 89.37240789
file name : Image_29122022151258830.png
|
2022-12-29 15:12:58.92519 |
88 |
47658654 |
Installation of Solar Light near Tasar Mia House at sansad IX |
35018 |
Installation of Solar Light near Tasar Mia House at sansad IX1 |
Completion of work |
-
latitude : 26.85289947
Longitude : 89.37197302
file name : Image_29122022151255079.png
|
2022-12-29 15:12:55.164153 |
89 |
47657929 |
Installation of Solar Light near Salma House at Sansad VIII |
35018 |
Installation of Solar Light near Salma House at Sansad VIII1 |
Completion of work |
-
latitude : 26.85629449
Longitude : 89.37260535
file name : Image_29122022150339273.png
|
2022-12-29 15:03:39.342621 |
90 |
47657506 |
Installation of Solar Light near the house of Ajijul at Sansad VIII |
35018 |
Installation of Solar Light near the house of Ajijul at Sansad VIII1 |
Completion of work |
-
latitude : 26.85666545
Longitude : 89.37344797
file name : Image_29122022150335302.png
|
2022-12-29 15:03:35.383085 |
91 |
47657700 |
Installation of Solar Light near Ansari house at Sansad VIII |
35018 |
Installation of Solar Light near Ansari house at Sansad VIII1 |
Completion of work |
-
latitude : 26.85620478
Longitude : 89.37338568
file name : Image_29122022150331624.png
|
2022-12-29 15:03:31.698962 |
92 |
47704215 |
Installation of Solar Light near Ashish Barua house at Sansad VII |
35018 |
Installation of Solar Light near Ashish Barua house at Sansad VII1 |
Completion of work |
-
latitude : 26.8563554
Longitude : 89.3770667
file name : Image_29122022152118738.png
|
2022-12-29 15:21:18.844586 |
93 |
47705049 |
installation of Solar Light near Sushil Paul House at sansad VII |
35018 |
installation of Solar Light near Sushil Paul House at sansad VII1 |
Completion of work |
-
latitude : 26.8563593
Longitude : 89.377955
file name : Image_29122022152114890.png
|
2022-12-29 15:21:14.981366 |
94 |
47704937 |
Installation of Solar Light near Mahendra Mahato House at sansad VII |
35018 |
Installation of Solar Light near Mahendra Mahato House at sansad VII1 |
Completion of work |
-
latitude : 26.85626465
Longitude : 89.37725169
file name : Image_29122022152107687.png
|
2022-12-29 15:21:07.786936 |
95 |
47704937 |
Installation of Solar Light near Mahendra Mahato House at sansad VII |
35018 |
Installation of Solar Light near Mahendra Mahato House at sansad VII1 |
Completion of work |
-
latitude : 26.8563554
Longitude : 89.3770667
file name : Image_29122022152111444.png
|
2022-12-29 15:21:11.529221 |
96 |
47627671 |
Installation of Solar Light near Biswajit Dutta house at Sansad V |
35018 |
Installation of Solar Light near Biswajit Dutta house at Sansad V1 |
Completion of work |
-
latitude : 26.85972369
Longitude : 89.37665793
file name : Image_29122022165352758.png
|
2022-12-29 16:53:52.858417 |
97 |
47627862 |
Installation of Solar Light near Kishor Sharma House at Sansad V |
35018 |
Installation of Solar Light near Kishor Sharma House at Sansad V1 |
Completion of work |
-
latitude : 26.85963008
Longitude : 89.37602979
file name : Image_29122022163128305.png
|
2022-12-29 16:31:28.453698 |
98 |
47627933 |
Installation of Solar Light near Jagadish Chowdhury House at Sansad V |
35018 |
Installation of Solar Light near Jagadish Chowdhury House at Sansad V1 |
Completion of work |
-
latitude : 26.86007265
Longitude : 89.37606102
file name : Image_29122022165348207.png
|
2022-12-29 16:53:48.304357 |
99 |
47625638 |
Installation of Solar Light near Shyamali Singh House at Sansad IV |
35018 |
Installation of Solar Light near Shyamali Singh House at Sansad IV1 |
Completion of work |
-
latitude : 26.85851921
Longitude : 89.37124662
file name : Image_30122022161125238.png
|
2022-12-30 16:11:25.31116 |
100 |
47625583 |
Installation of Solar Light near Reba Debi House at Sansad IV |
35018 |
Installation of Solar Light near Reba Debi House at Sansad IV1 |
Completion of work |
-
latitude : 26.85871831
Longitude : 89.37434537
file name : Image_30122022160201796.png
|
2022-12-30 16:02:01.883014 |
101 |
47624930 |
Installation of Solar Light near Madan Tamang House at Sansad III |
35018 |
Installation of Solar Light near Madan Tamang House at Sansad III1 |
Completion of work |
-
latitude : 26.85674089
Longitude : 89.37397778
file name : Image_30122022131523078.png
|
2022-12-30 13:15:23.170855 |
102 |
47625188 |
Installation of Solar Light near Anju Tamang House at Sansad III |
35018 |
Installation of Solar Light near Anju Tamang House at Sansad III1 |
Completion of work |
-
latitude : 26.85677667
Longitude : 89.37299912
file name : Image_30122022130802003.png
|
2022-12-30 13:08:02.076203 |
103 |
47624832 |
Installation of Solar Light near Barman House at Sansad III |
35018 |
Installation of Solar Light near Barman House at Sansad III1 |
Completion of work |
-
latitude : 26.85767723
Longitude : 89.37337267
file name : Image_30122022125551525.png
|
2022-12-30 12:55:51.626288 |
104 |
47690318 |
Installation of Solar Light near Amit Gupta House at Sansad I |
35018 |
Installation of Solar Light near Amit Gupta House at Sansad I1 |
Completion of work |
-
latitude : 26.8584287
Longitude : 89.38008425
file name : Image_30122022141716940.png
|
2022-12-30 14:17:17.009709 |
105 |
47690699 |
Installation of Solar Light near Sagar Alam House at sansad I |
35018 |
Installation of Solar Light near Sagar Alam House at sansad I1 |
Completion of work |
-
latitude : 26.86004495
Longitude : 89.38007374
file name : Image_30122022140317578.png
|
2022-12-30 14:03:17.651649 |
106 |
47690506 |
Installation of Solar Light near Vijay Rai House at sansad I |
35018 |
Installation of Solar Light near Vijay Rai House at sansad I1 |
Completion of work |
-
latitude : 26.85958254
Longitude : 89.37995486
file name : Image_30122022140753504.png
|
2022-12-30 14:07:53.579964 |
107 |
47622682 |
Installation of Rigbore near the house of Sima KArmakar at Subash Pally at Sansad V |
443160 |
Installation of Rigbore near the house of Sima KArmakar at Subash Pally at Sansad V1 |
Completion of work |
-
latitude : 26.85605105
Longitude : 89.37924414
file name : Image_15022023170743320.png
|
2023-02-15 17:07:43.396319 |
108 |
47624226 |
Installation of Rigbore with Pump House near Gulam Habibs House at Jharna Busty |
443160 |
Installation of Rigbore with Pump House near Gulam Habibs House at Jharna Busty 1 |
Completion of work |
-
latitude : 26.85265249
Longitude : 89.3841403
file name : Image_04022023170822199.png
|
2023-02-04 17:08:22.273766 |
109 |
47624292 |
Installation of Rigbore at New Subash Pally Chowpathi |
443160 |
Installation of Rigbore at New Subash Pally Chowpathi 1 |
Plinth level |
-
latitude : 26.85753125
Longitude : 89.37373156
file name : Image_05022023164002002.png
|
2023-02-05 16:40:02.084121 |
110 |
47624292 |
Installation of Rigbore at New Subash Pally Chowpathi |
443160 |
Installation of Rigbore at New Subash Pally Chowpathi 1 |
Completion of work |
-
latitude : 26.85897755
Longitude : 89.3728925
file name : Image_02022023160427155.png
|
2023-02-02 16:04:27.235755 |
111 |
47622793 |
Installation of Rigbore with Sub Mersible Pump near the Kali Mandir at Sansad VI |
443160 |
Installation of Rigbore with Sub Mersible Pump near the Kali Mandir at Sansad VI1 |
Plinth level |
-
latitude : 26.8533987
Longitude : 89.3744017
file name : Image_15022023171808556.png
|
2023-02-15 17:18:08.633827 |
112 |
47688815 |
Installation of Solar Light near Shyam Sundar lakhotia at sansad XVI |
30000 |
Installation of Solar Light near Shyam Sundar lakhotia at sansad XVI1 |
Completion of work |
-
latitude : 26.8544785
Longitude : 89.38037212
file name : Image_24032023164046321.png
|
2023-03-24 16:40:46.386996 |
113 |
47689416 |
Installation of Solar Light near Bina Kirtaniya House at sansad XVI |
30000 |
Installation of Solar Light near Bina Kirtaniya House at sansad XVI1 |
Completion of work |
-
latitude : 26.85183784
Longitude : 89.38053272
file name : Image_17032023170807703.png
|
2023-03-17 17:08:07.788832 |
114 |
47689878 |
Installation of Solar Light near Ajay Kumar Agarwal at sansad I |
30000 |
Installation of Solar Light near Ajay Kumar Agarwal at sansad I1 |
Completion of work |
-
latitude : 26.86033414
Longitude : 89.3792472
file name : Image_17032023164500329.png
|
2023-03-17 16:45:00.438603 |
115 |
47690130 |
Installation of Solar Light near Basant Chhetri houest at sansad I |
30000 |
Installation of Solar Light near Basant Chhetri houest at sansad I1 |
Completion of work |
-
latitude : 26.85264196
Longitude : 89.37601049
file name : Image_24032023162924955.png
|
2023-03-24 16:29:25.066223 |
116 |
47704423 |
Installation of Solar Light near Barman House at sansad VII |
30000 |
Installation of Solar Light near Barman House at sansad VII1 |
Completion of work |
-
latitude : 26.85611905
Longitude : 89.37689551
file name : Image_17032023145934485.png
|
2023-03-17 14:59:34.567392 |
117 |
47690860 |
Installation of Solar Light near Adresh School at sansad XIX |
30000 |
Installation of Solar Light near Adresh School at sansad XIX1 |
Completion of work |
-
latitude : 26.858791
Longitude : 89.3830353
file name : Image_08062023183037032.png
|
2023-06-08 18:30:37.168128 |
118 |
47691083 |
Installation of Solar Light near Rajasthan Bhajanlaya at sansad XIX |
30000 |
Installation of Solar Light near Rajasthan Bhajanlaya at sansad XIX1 |
Completion of work |
-
latitude : 26.8587864
Longitude : 89.3830705
file name : Image_08062023182806749.png
|
2023-06-08 18:28:06.825089 |
119 |
47692245 |
Installation of Solar Light near Subaratna House at sansad XX |
30000 |
Installation of Solar Light near Subaratna House at sansad XX1 |
Completion of work |
-
latitude : 26.8571096
Longitude : 89.3825777
file name : Image_31032023170741397.png
|
2023-03-31 17:07:41.489574 |
120 |
47704304 |
Installation of Solar Light near Jitendra Debnath House at sansad VII |
30000 |
Installation of Solar Light near Jitendra Debnath House at sansad VII1 |
Completion of work |
-
latitude : 26.85520859
Longitude : 89.38432557
file name : Image_08062023163454429.png
|
2023-06-08 16:34:54.512582 |
121 |
47705161 |
Installation of Solar Light near Shiwli Mandal House at sansad XII |
30000 |
Installation of Solar Light near Shiwli Mandal House at sansad XII1 |
Completion of work |
-
latitude : 26.85724751
Longitude : 89.37945905
file name : Image_08062023152335433.png
|
2023-06-08 15:23:35.509938 |
122 |
66508936 |
Purchase of Sanitary Pad Incinerator |
53000 |
Purchase of Sanitary Pad Incinerator1 |
Roof laid |
-
latitude : 26.856538
Longitude : 89.3755609
file name : Image_10082024202908885.png
|
2024-08-10 20:29:08.977622 |
123 |
66508936 |
Purchase of Sanitary Pad Incinerator |
53000 |
Purchase of Sanitary Pad Incinerator1 |
Plinth level |
-
latitude : 26.8563903
Longitude : 89.3757033
file name : Image_10082024201444879.png
|
2024-08-10 20:14:44.987576 |
124 |
66508936 |
Purchase of Sanitary Pad Incinerator |
53000 |
Purchase of Sanitary Pad Incinerator1 |
Completion of work |
-
latitude : 26.8560554
Longitude : 89.37619
file name : Image_24022023144706005.png
|
2023-02-24 14:47:06.086747 |
125 |
66508936 |
Purchase of Sanitary Pad Incinerator |
53000 |
Purchase of Sanitary Pad Incinerator1 |
Completion of work |
-
latitude : 26.8560554
Longitude : 89.37619
file name : Image_24022023144739454.png
|
2023-02-24 14:47:39.538872 |
126 |
66508585 |
Creation of drainage channel for management of grey water |
527474 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.85203935,26.85203935,26.8520392
Longitude : 89.37618367,89.37618367,89.37618368
file name : Image_22022023184923042.png
|
2023-02-22 18:49:23.114976 |
127 |
47705477 |
Installation of Solar Light near Kishor Gupta Hoiuse at sansad XII |
30000 |
Installation of Solar Light near Kishor Gupta Hoiuse at sansad XII1 |
Completion of work |
-
latitude : 26.8563657
Longitude : 89.3794354
file name : Image_17032023162915832.png
|
2023-03-17 16:29:15.914267 |
128 |
47706518 |
Installation of Solar Light near St Marchale Church at sansad XXI |
30000 |
Installation of Solar Light near St Marchale Church at sansad XXI1 |
Completion of work |
-
latitude : 26.85620736
Longitude : 89.38324405
file name : Image_20032023155353408.png
|
2023-03-20 15:53:53.483122 |
129 |
47706621 |
Installation of Solar Light near Bhim Prasad Sharma House at sansad XXI |
30000 |
Installation of Solar Light near Bhim Prasad Sharma House at sansad XXI1 |
Completion of work |
-
latitude : 26.85551169
Longitude : 89.38384566
file name : Image_20032023155349649.png
|
2023-03-20 15:53:49.72265 |
130 |
47706764 |
Installation of Solar Light near Sabina Lama House at sansad XXI |
30000 |
Installation of Solar Light near Sabina Lama House at sansad XXI1 |
Completion of work |
-
latitude : 26.85486197
Longitude : 89.38332731
file name : Image_17032023174840956.png
|
2023-03-17 17:48:41.035817 |
131 |
65783001 |
Emergent Protective Work near the house of Abdul Latif to Masjid at Jharna Basty at part 11 by 18 |
952440 |
Emergent Protective Work near the house of Abdul Latif to Masjid at Jharna Basty at part 11 by 181 |
Completion of work |
-
latitude : 26.85525944,26.85525613,26.85525502
Longitude : 89.38483666,89.38483817,89.38484026
file name : Image_23022023180144588.png
|
2023-02-23 18:01:44.70497 |
132 |
58080022 |
Const of Paver Block Road from Kaji to Pandit House via anjay Rai to Saili Lama at BB Toll |
316636 |
Const of Paver Block Road from Kaji to Pandit House via anjay Rai to Saili Lama at BB Toll1 |
Completion of work |
-
latitude : 26.8528641,26.8528641,26.8528641
Longitude : 89.3747614,89.3747614,89.3747614
file name : Image_01032023145652951.png
|
2023-03-01 14:56:53.102601 |
133 |
66508837 |
Purchase of Sanitary Pad Incinerator |
53000 |
Purchase of Sanitary Pad Incinerator1 |
Completion of work |
-
latitude : 26.8578253
Longitude : 89.3750829
file name : Image_01032023145809275.png
|
2023-03-01 14:58:09.357252 |
134 |
66508851 |
Purchase of Sanitary Pad Incinerator |
53000 |
Purchase of Sanitary Pad Incinerator1 |
Roof laid |
-
latitude : 26.8552908
Longitude : 89.3758859
file name : Image_06082024165429514.png
|
2024-08-06 16:54:29.732006 |
135 |
66508851 |
Purchase of Sanitary Pad Incinerator |
53000 |
Purchase of Sanitary Pad Incinerator1 |
Plinth level |
-
latitude : 26.8552689
Longitude : 89.3759342
file name : Image_06082024162950855.png
|
2024-08-06 16:29:50.953932 |
136 |
66508851 |
Purchase of Sanitary Pad Incinerator |
53000 |
Purchase of Sanitary Pad Incinerator1 |
Completion of work |
-
latitude : 26.8480606
Longitude : 89.3815966
file name : Image_27022023153447431.png
|
2023-02-27 15:34:47.51198 |
137 |
66508823 |
Purchase of Sanitary Pad Incinerator |
53000 |
Purchase of Sanitary Pad Incinerator1 |
Completion of work |
-
latitude : 26.8575615
Longitude : 89.3717927
file name : Image_24022023144929459.png
|
2023-02-24 14:49:29.539853 |
138 |
77675076 |
INSTALLATION OF SOLAR LIGHT MEAR SARASWATI SHA HOUSE |
34900 |
INSTALLATION OF SOLAR LIGHT MEAR SARASWATI SHA HOUSE1 |
Completion of work |
-
latitude : 26.8559696
Longitude : 89.3792842
file name : Image_27062023134326481.png
|
2023-06-27 13:43:26.548113 |
139 |
66508873 |
Purchase of Sanitary Pad Incinerator |
53000 |
Purchase of Sanitary Pad Incinerator1 |
Completion of work |
-
latitude : 26.8548055
Longitude : 89.3823754
file name : Image_24022023151019239.png
|
2023-02-24 15:10:19.320478 |
140 |
66508818 |
Purchase of Sanitary Pad Dispenser |
97000 |
Purchase of Sanitary Pad Dispenser1 |
Completion of work |
-
latitude : 26.8576439
Longitude : 89.3728281
file name : Image_24022023144811504.png
|
2023-02-24 14:48:11.588912 |
141 |
66508829 |
Purchase of Sanitary Pad Dispenser |
97000 |
Purchase of Sanitary Pad Dispenser1 |
Completion of work |
-
latitude : 26.857737
Longitude : 89.3751061
file name : Image_01032023145658429.png
|
2023-03-01 14:56:58.500273 |
142 |
66508843 |
Purchase of Sanitary Pad Dispenser |
97000 |
Purchase of Sanitary Pad Dispenser1 |
Roof laid |
-
latitude : 26.8552899
Longitude : 89.3758838
file name : Image_06082024170216737.png
|
2024-08-06 17:02:16.869682 |
143 |
66508843 |
Purchase of Sanitary Pad Dispenser |
97000 |
Purchase of Sanitary Pad Dispenser1 |
Plinth level |
-
latitude : 26.8552627
Longitude : 89.3758661
file name : Image_06082024153134229.png
|
2024-08-06 15:31:34.339563 |
144 |
66508843 |
Purchase of Sanitary Pad Dispenser |
97000 |
Purchase of Sanitary Pad Dispenser1 |
Completion of work |
-
latitude : 26.8552789
Longitude : 89.3758055
file name : Image_27022023153444318.png
|
2023-02-27 15:34:44.409057 |
145 |
47623875 |
Construction of PCC Drain with Iron Cover near Sanjay Jaiswal house to C K Thapa at Sansad XX |
346186 |
Construction of PCC Drain with Iron Cover near Sanjay Jaiswal house to C K Thapa at Sansad XX1 |
Plinth level |
-
latitude : 26.8588334,26.8588334
Longitude : 89.3836747,89.3836747
file name : Image_02032023173907725.png
|
2023-03-02 17:39:07.818039 |
146 |
47623875 |
Construction of PCC Drain with Iron Cover near Sanjay Jaiswal house to C K Thapa at Sansad XX |
346186 |
Construction of PCC Drain with Iron Cover near Sanjay Jaiswal house to C K Thapa at Sansad XX1 |
Completion of work |
-
latitude : 26.8600069,26.8600069,26.8600069
Longitude : 89.3812136,89.3812136,89.3812136
file name : Image_22022023175507271.png
|
2023-02-22 17:55:07.35048 |
147 |
47623673 |
Installation of Rigbore near the House of Ram Bahadur at Sanasad no XVI |
434297 |
Installation of Rigbore near the House of Ram Bahadur at Sanasad no XVI1 |
Completion of work |
-
latitude : 26.85203131
Longitude : 89.37625782
file name : Image_22022023184621557.png
|
2023-02-22 18:46:21.644979 |
148 |
47622616 |
Installation of Rigbore near the house of Kedar Thapa at New Subashpally |
480769 |
Installation of Rigbore near the house of Kedar Thapa at New Subashpally1 |
Completion of work |
-
latitude : 26.8556009
Longitude : 89.3729211
file name : Image_22022023171126613.png
|
2023-02-22 17:11:26.69531 |
149 |
66508386 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.85668395,26.85669259,26.85669444
Longitude : 89.37293104,89.37292654,89.37292583
file name : Image_03032023180344781.png
|
2023-03-03 18:03:44.87995 |
150 |
47625252 |
Installation of Solar Light near Subba House at Sansad III |
25000 |
Installation of Solar Light near Subba House at Sansad III1 |
Completion of work |
-
latitude : 26.8579336
Longitude : 89.3728888
file name : Image_20032023160420853.png
|
2023-03-20 16:04:20.925905 |
151 |
47627728 |
Installation of Solar Light near Munna Lepcha House at Sansad V |
25000 |
Installation of Solar Light near Munna Lepcha House at Sansad V1 |
Completion of work |
-
latitude : 26.85270902
Longitude : 89.37644228
file name : Image_24032023163100391.png
|
2023-03-24 16:31:00.506689 |
152 |
47625322 |
Installation of Solar Light near Mojaffar Hossain house at sansad III |
25000 |
Installation of Solar Light near Mojaffar Hossain house at sansad III1 |
Completion of work |
-
latitude : 26.8581148
Longitude : 89.3740536
file name : Image_20032023162439150.png
|
2023-03-20 16:24:39.233507 |
153 |
47657302 |
Installation of Solar Light near the house of Bulbuli at sansad VIII |
30000 |
Installation of Solar Light near the house of Bulbuli at sansad VIII1 |
Completion of work |
-
latitude : 26.8565716
Longitude : 89.37407937
file name : Image_20032023155357549.png
|
2023-03-20 15:53:57.623314 |
154 |
47627786 |
Installation of Solar light near Sidhu Jaiswal House at Sansad V |
25000 |
Installation of Solar light near Sidhu Jaiswal House at Sansad V1 |
Completion of work |
-
latitude : 26.8596514
Longitude : 89.3773013
file name : Image_31032023170737966.png
|
2023-03-31 17:07:38.053705 |
155 |
47657119 |
Installation of Solar Light near the house of Sumitra at Sansad VIII |
25000 |
Installation of Solar Light near the house of Sumitra at Sansad VIII1 |
Completion of work |
-
latitude : 26.8528779
Longitude : 89.3838842
file name : Image_06062023190949478.png
|
2023-06-06 19:09:49.564206 |
156 |
47658485 |
Installation of Solar Light near Mahamilan Club at Sansad IX |
30000 |
Installation of Solar Light near Mahamilan Club at Sansad IX1 |
Completion of work |
-
latitude : 26.85201039
Longitude : 89.37232633
file name : Image_13032023143537953.png
|
2023-03-13 14:35:38.033324 |
157 |
47658821 |
Installation of Solar Light near Hindi High School at Sansad IX |
30000 |
Installation of Solar Light near Hindi High School at Sansad IX1 |
Completion of work |
-
latitude : 26.8527352
Longitude : 89.37309099
file name : Image_13032023143530812.png
|
2023-03-13 14:35:30.905531 |
158 |
47659217 |
Installation of Solar Light near Tankir Paar at Sansad X |
30000 |
Installation of Solar Light near Tankir Paar at Sansad X1 |
Completion of work |
-
latitude : 26.85387706
Longitude : 89.37462709
file name : Image_17032023172802352.png
|
2023-03-17 17:28:02.428066 |
159 |
47627318 |
Installation of Solar Light near Saran Biswakarma at Sansad |
25000 |
Installation of Solar Light near Saran Biswakarma at Sansad1 |
Completion of work |
-
latitude : 26.86008205
Longitude : 89.373342
file name : Image_13032023151331681.png
|
2023-03-13 15:13:31.754102 |
160 |
47628197 |
Installation of Solar Light near Deep Roy House at Sansad VI |
25000 |
Installation of Solar Light near Deep Roy House at Sansad VI1 |
Completion of work |
-
latitude : 26.8572407
Longitude : 89.37692903
file name : Image_08062023164801370.png
|
2023-06-08 16:48:01.456184 |
161 |
47659932 |
Installation of Solar Light near Shanti Oraon House at sansad XI |
30000 |
Installation of Solar Light near Shanti Oraon House at sansad XI1 |
Completion of work |
-
latitude : 26.85640449
Longitude : 89.37719455
file name : Image_17032023152438724.png
|
2023-03-17 15:24:38.824851 |
162 |
47660503 |
Installation of Solar Light near Faiyaj Alam House at sansad XI |
30000 |
Installation of Solar Light near Faiyaj Alam House at sansad XI1 |
Completion of work |
-
latitude : 26.85868635
Longitude : 89.37708073
file name : Image_17032023160837309.png
|
2023-03-17 16:08:37.437667 |
163 |
47662214 |
Installation of Solar Light near Tshering Lama House at sansad XIII |
30000 |
Installation of Solar Light near Tshering Lama House at sansad XIII1 |
Completion of work |
-
latitude : 26.85442342
Longitude : 89.37602709
file name : Image_24032023162214014.png
|
2023-03-24 16:22:14.095232 |
164 |
47628124 |
Installation of Solar Light near SHMD School at Sansad VI |
25000 |
Installation of Solar Light near SHMD School at Sansad VI1 |
Completion of work |
-
latitude : 26.85701191
Longitude : 89.3762933
file name : Image_20032023163503609.png
|
2023-03-20 16:35:03.671993 |
165 |
34943398 |
PCC DRAIN FROM S.S.K TO RAJ KUMAR HOUSE |
98901 |
PCC DRAIN FROM S.S.K TO RAJ KUMAR HOUSE1 |
Completion of work |
-
latitude : 26.85279974,26.85279973
Longitude : 89.38114256,89.38114251
file name : Image_12052023181450414.png
|
2023-05-12 18:14:50.490495 |
166 |
34743162 |
PCC ROAD FROM NIRMAL KUMAR TO SANJAY AGARWAL |
98901 |
PCC ROAD FROM NIRMAL KUMAR TO SANJAY AGARWAL1 |
Completion of work |
-
latitude : 26.85978158,26.85978158,26.85978877
Longitude : 89.37895363,89.37895363,89.37895338
file name : Image_12052023184016411.png
|
2023-05-12 18:40:16.486425 |
167 |
47695104 |
Construction of Guard Wall from Kalia House to Hindi HS at sansad IX |
206098 |
Construction of Guard Wall from Kalia House to Hindi HS at sansad IX1 |
Completion of work |
-
latitude : 26.85368257
Longitude : 89.37119177
file name : Image_08052023132952007.png
|
2023-05-08 13:29:52.084834 |
168 |
47695657 |
Construction of PCC Road with Paver Block from Dinanath Gupta to Jamuna Sha House at XI |
179101 |
Construction of PCC Road with Paver Block from Dinanath Gupta to Jamuna Sha House at XI1 |
Completion of work |
-
latitude : 26.85908073,26.85908078,26.85908077
Longitude : 89.376187,89.37618709,89.37618714
file name : Image_08052023140922567.png
|
2023-05-08 14:09:22.642103 |
169 |
47699411 |
Construction of PCC Road with Paver Block road from Kajal Kaur to Tilak Thapa House at sansad XVI |
177902 |
Construction of PCC Road with Paver Block road from Kajal Kaur to Tilak Thapa House at sansad XVI1 |
Completion of work |
-
latitude : 26.85221407,26.85221407,26.85221319
Longitude : 89.37966801,89.37966801,89.37966762
file name : Image_08052023133953207.png
|
2023-05-08 13:39:53.302609 |
170 |
36227285 |
PCC DRAIN FROM THE HOUSE OF ANITA RAI TO MOKTAR MIA HOUSE |
408873 |
PCC DRAIN FROM THE HOUSE OF ANITA RAI TO MOKTAR MIA HOUSE1 |
Roof laid |
-
latitude : 26.8576808,26.8576808,26.8576808
Longitude : 89.3737598,89.3737598,89.3737598
file name : Image_03032022144903532.png
|
2022-03-03 14:49:03.631479 |
171 |
36227285 |
PCC DRAIN FROM THE HOUSE OF ANITA RAI TO MOKTAR MIA HOUSE |
408873 |
PCC DRAIN FROM THE HOUSE OF ANITA RAI TO MOKTAR MIA HOUSE1 |
Plinth level |
-
latitude : 26.8576586,26.8576586,26.8576586
Longitude : 89.3738049,89.3738049,89.3738049
file name : Image_22022022134450281.png
|
2022-02-22 13:44:50.375428 |
172 |
36227285 |
PCC DRAIN FROM THE HOUSE OF ANITA RAI TO MOKTAR MIA HOUSE |
408873 |
PCC DRAIN FROM THE HOUSE OF ANITA RAI TO MOKTAR MIA HOUSE1 |
Completion of work |
-
latitude : 26.8574454,26.8576501,26.85765005
Longitude : 89.3738095,89.37378856,89.37378855
file name : Image_16022022161256468.png
|
2022-02-16 16:12:56.534197 |
173 |
36227285 |
PCC DRAIN FROM THE HOUSE OF ANITA RAI TO MOKTAR MIA HOUSE |
408873 |
PCC DRAIN FROM THE HOUSE OF ANITA RAI TO MOKTAR MIA HOUSE1 |
Completion of work |
-
latitude : 26.8575481,26.8575481
Longitude : 89.3730844,89.3730844
file name : Image_25012022170422384.png
|
2022-01-25 17:04:22.48759 |
174 |
47695918 |
Construction of PCC Road from Jaiswal Medicle shop to Kamalesh House at sansad XII |
202084 |
Construction of PCC Road from Jaiswal Medicle shop to Kamalesh House at sansad XII1 |
Completion of work |
-
latitude : 26.8571157,26.8571157,26.8571157
Longitude : 89.379293,89.379293,89.379293
file name : Image_16052023154905795.png
|
2023-05-16 15:49:05.878422 |
175 |
58073640 |
Const of PCC Road from Tala Busty Sabjiwala House to Yusub Miya House at part 11 by 3 |
195349 |
Const of PCC Road from Tala Busty Sabjiwala House to Yusub Miya House at part 11 by 31 |
Completion of work |
-
latitude : 26.8567079,26.8567079,26.8567079
Longitude : 89.3735133,89.3735133,89.3735133
file name : Image_15052023170306206.png
|
2023-05-15 17:03:06.292012 |
176 |
58075118 |
Const of Road from Khokon Biswas to Anu Chhetri House at part no 11 by 8 |
195349 |
Const of Road from Khokon Biswas to Anu Chhetri House at part no 11 by 81 |
Roof laid |
-
latitude : 26.8550572,26.8550572,26.8550572
Longitude : 89.3770036,89.3770036,89.3770036
file name : Image_10082024174217904.png
|
2024-08-10 17:42:18.001736 |
177 |
58075118 |
Const of Road from Khokon Biswas to Anu Chhetri House at part no 11 by 8 |
195349 |
Const of Road from Khokon Biswas to Anu Chhetri House at part no 11 by 81 |
Plinth level |
-
latitude : 26.85561368,26.85561368,26.85561368,26.85561353
Longitude : 89.37675307,89.37675307,89.37675307,89.37675294
file name : Image_10082024173227976.png
|
2024-08-10 17:32:28.074829 |
178 |
58075118 |
Const of Road from Khokon Biswas to Anu Chhetri House at part no 11 by 8 |
195349 |
Const of Road from Khokon Biswas to Anu Chhetri House at part no 11 by 81 |
Completion of work |
-
latitude : 26.8519375,26.8519375,26.8519375
Longitude : 89.37785605,89.37785605,89.37785605
file name : Image_17052023163450722.png
|
2023-05-17 16:34:50.79738 |
179 |
57942866 |
Const of CC Drain with slab from Fulmaya Lama to Rajkumar house via Dal Brd Pradhan at 11 by 6 |
200255 |
Const of CC Drain with slab from Fulmaya Lama to Rajkumar house via Dal Brd Pradhan at 11 by 61 |
Completion of work |
-
latitude : 26.8600553,26.8600553,26.8600553
Longitude : 89.3759931,89.3759931,89.3759931
file name : Image_16052023173012182.png
|
2023-05-16 17:30:12.258344 |
180 |
47699654 |
Construction of PCC Road from Sharmila Mangar to man Kumari tamang House at sansad XVII |
202084 |
Construction of PCC Road from Sharmila Mangar to man Kumari tamang House at sansad XVII1 |
Completion of work |
-
latitude : 26.85429986,26.85430036,26.85430036
Longitude : 89.3848135,89.38481098,89.38481098
file name : Image_22052023151517451.png
|
2023-05-22 15:15:17.537193 |
181 |
57944110 |
Const of PCC Drain from JYotinath Pradhan to Subarna Lama House at part 11 by 18 |
201126 |
Const of PCC Drain from JYotinath Pradhan to Subarna Lama House at part 11 by 181 |
Completion of work |
-
latitude : 26.8529357,26.8529357,26.8529357
Longitude : 89.381106,89.381106,89.381106
file name : Image_16052023181521520.png
|
2023-05-16 18:15:21.630977 |
182 |
66625099 |
Const of Paver Block Road from the HO Bishnu Prasad to Tara Lama |
203768 |
Const of Paver Block Road from the HO Bishnu Prasad to Tara Lama 1 |
Completion of work |
-
latitude : 26.8520376,26.8520376,26.8520376
Longitude : 89.3778197,89.3778197,89.3778197
file name : Image_17052023150547428.png
|
2023-05-17 15:05:47.513907 |
183 |
47701432 |
Construction of PCC Road from Salma to Abdul Khalek House aat Sansad XVIII |
202084 |
Construction of PCC Road from Salma to Abdul Khalek House aat Sansad XVIII1 |
Completion of work |
-
latitude : 26.85521674,26.85521674,26.85387942
Longitude : 89.37589986,89.37589986,89.38287549
file name : Image_22052023150409822.png
|
2023-05-22 15:04:09.899849 |
184 |
35368612 |
PCC DRAIN WITH SLAB FROM PRATIMA BASAK HOUSE TO PRAKASH GUPTA |
98901 |
PCC DRAIN WITH SLAB FROM PRATIMA BASAK HOUSE TO PRAKASH GUPTA1 |
Completion of work |
-
latitude : 26.8519261,26.8519261,26.8519261,26.8519261
Longitude : 89.3744017,89.3744017,89.3744017,89.3744017
file name : Image_29052023163858124.png
|
2023-05-29 16:38:58.220034 |
185 |
35368612 |
PCC DRAIN WITH SLAB FROM PRATIMA BASAK HOUSE TO PRAKASH GUPTA |
98901 |
PCC DRAIN WITH SLAB FROM PRATIMA BASAK HOUSE TO PRAKASH GUPTA1 |
Completion of work |
-
latitude : 26.8515999,26.8515999,26.8515999
Longitude : 89.37621053,89.37621053,89.37621053
file name : Image_29052023163903852.png
|
2023-05-29 16:39:03.927233 |
186 |
36232409 |
RENOVATION OF MINOR CANAL FOR COMMUNITY FROM HOUSE OF PURNIMA BARDEWA TO LALAN GUPTA |
98901 |
RENOVATION OF MINOR CANAL FOR COMMUNITY FROM HOUSE OF PURNIMA BARDEWA TO LALAN GUPTA1 |
Completion of work |
-
latitude : 26.85325719,26.85325706,26.85325701
Longitude : 89.38105153,89.38105187,89.38105197
file name : Image_12052023181401227.png
|
2023-05-12 18:14:01.301509 |
187 |
36223485 |
CONSTRUCTION OF PCC ROAD WITH DRAIN SLAB FROM SSK SCHOOL TO HAJARILAL SAHA HOUSE |
98901 |
CONSTRUCTION OF PCC ROAD WITH DRAIN SLAB FROM SSK SCHOOL TO HAJARILAL SAHA HOUSE1 |
Completion of work |
-
latitude : 26.85282902,26.85282902,26.85282913
Longitude : 89.3811766,89.3811766,89.38117634
file name : Image_12052023181626701.png
|
2023-05-12 18:16:26.782636 |
188 |
36223119 |
PCC ROAD FROM THE HOUSE BRIJESH KANU TO PURNA DAS HOUSE AT JHARNA BASTY |
98901 |
PCC ROAD FROM THE HOUSE BRIJESH KANU TO PURNA DAS HOUSE AT JHARNA BASTY1 |
Completion of work |
-
latitude : 26.8530921,26.85310449,26.85310925
Longitude : 89.37500722,89.37499326,89.37498745
file name : Image_29052023162911565.png
|
2023-05-29 16:29:11.645358 |
189 |
36231088 |
PCC ROAD YSC CLUB TO SUNRISE SCHOOL |
98901 |
PCC ROAD YSC CLUB TO SUNRISE SCHOOL1 |
Completion of work |
-
latitude : 26.85640921,26.85640921,26.8564092
Longitude : 89.38226675,89.38226675,89.38226674
file name : Image_12052023182851874.png
|
2023-05-12 18:28:51.989002 |
190 |
47695345 |
Construction of Guard Wall from Abed Ali mia house to Paloan Mia House at sansad X |
239093 |
Construction of Guard Wall from Abed Ali mia house to Paloan Mia House at sansad X1 |
Completion of work |
-
latitude : 26.85426921
Longitude : 89.37227652
file name : Image_24052023170042042.png
|
2023-05-24 17:00:42.129206 |
191 |
66570904 |
Creation of drainage channel for management of grey water |
200255 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.85657605,26.8565761,26.8565761
Longitude : 89.38070232,89.38070227,89.38070227
file name : Image_22052023154102059.png
|
2023-05-22 15:41:02.140504 |
192 |
36220237 |
PCC ROAD FROM GANESH JAISWAL TO SUNIL MEHERA HOUSE AT JHARNA BASTY |
283920 |
PCC ROAD FROM GANESH JAISWAL TO SUNIL MEHERA HOUSE AT JHARNA BASTY1 |
Completion of work |
-
latitude : 26.85658434,26.85658434,26.85658461
Longitude : 89.37916732,89.37916732,89.37916752
file name : Image_12082021094429695.png
|
2021-08-12 09:44:29.819655 |
193 |
36220237 |
PCC ROAD FROM GANESH JAISWAL TO SUNIL MEHERA HOUSE AT JHARNA BASTY |
283920 |
PCC ROAD FROM GANESH JAISWAL TO SUNIL MEHERA HOUSE AT JHARNA BASTY1 |
Plinth level |
-
latitude : 26.8564909,26.8564909,26.8567301
Longitude : 89.3783258,89.3783258,89.3784064
file name : Image_26072021154121843.png
|
2021-07-26 15:41:21.957452 |
194 |
36220237 |
PCC ROAD FROM GANESH JAISWAL TO SUNIL MEHERA HOUSE AT JHARNA BASTY |
283920 |
PCC ROAD FROM GANESH JAISWAL TO SUNIL MEHERA HOUSE AT JHARNA BASTY1 |
Completion of work |
-
latitude : 26.8566125,26.8566125,26.8566125
Longitude : 89.3792556,89.3792556,89.3792556
file name : Image_13072021161330811.png
|
2021-07-13 16:13:30.8976 |
195 |
36227708 |
PCC DRAIN FROM THE HOUSE OF NITAI MANDAL TO MADAN RAI HOUSE |
267270 |
PCC DRAIN FROM THE HOUSE OF NITAI MANDAL TO MADAN RAI HOUSE1 |
Completion of work |
-
latitude : 26.8545716,26.8545716
Longitude : 89.3831242,89.3831242
file name : Image_08102021181805005.png
|
2021-10-08 18:18:05.097203 |
196 |
36227708 |
PCC DRAIN FROM THE HOUSE OF NITAI MANDAL TO MADAN RAI HOUSE |
267270 |
PCC DRAIN FROM THE HOUSE OF NITAI MANDAL TO MADAN RAI HOUSE1 |
Completion of work |
-
latitude : 26.8520043,26.8520043,26.8520043
Longitude : 89.3803468,89.3803468,89.3803468
file name : Image_10082021130505344.png
|
2021-08-10 13:05:05.479965 |
197 |
36227708 |
PCC DRAIN FROM THE HOUSE OF NITAI MANDAL TO MADAN RAI HOUSE |
267270 |
PCC DRAIN FROM THE HOUSE OF NITAI MANDAL TO MADAN RAI HOUSE1 |
Completion of work |
-
latitude : 26.8524677,26.8524677,26.8524677
Longitude : 89.3805368,89.3805368,89.3805368
file name : Image_05072021162000202.png
|
2021-07-05 16:20:00.302286 |
198 |
77641062 |
CONS OF PCC ROAD FROM RADHIKA BISWA TO ARJUN LAMA HOUSE |
860839 |
CONS OF PCC ROAD FROM RADHIKA BISWA TO ARJUN LAMA HOUSE1 |
Roof laid |
-
latitude : 26.85951953,26.85951957,26.85951957,26.85951957
Longitude : 89.38334338,89.38334447,89.38334447,89.38334447
file name : Image_24012024174503090.png
|
2024-01-24 17:45:03.206838 |
199 |
77641062 |
CONS OF PCC ROAD FROM RADHIKA BISWA TO ARJUN LAMA HOUSE |
860839 |
CONS OF PCC ROAD FROM RADHIKA BISWA TO ARJUN LAMA HOUSE1 |
Plinth level |
-
latitude : 26.85953028,26.85953025,26.85953024
Longitude : 89.38333376,89.38333374,89.38333374
file name : Image_24012024171745676.png
|
2024-01-24 17:17:45.7935 |
200 |
77641062 |
CONS OF PCC ROAD FROM RADHIKA BISWA TO ARJUN LAMA HOUSE |
860839 |
CONS OF PCC ROAD FROM RADHIKA BISWA TO ARJUN LAMA HOUSE1 |
Completion of work |
-
latitude : 26.8589593,26.8589593,26.8589593
Longitude : 89.3829561,89.3829561,89.3829561
file name : Image_01062023153220064.png
|
2023-06-01 15:32:20.217817 |
201 |
58070694 |
Repairing of Vivekananda SSK at BB Toll |
99175 |
Repairing of Vivekananda SSK at BB Toll1 |
Completion of work |
-
latitude : 26.8575618
Longitude : 89.3718089
file name : Image_11082023182020929.png
|
2023-08-11 18:20:20.997508 |
202 |
77676593 |
INSTALLATION OF SOLAR LIGHT NEAR ABDULLAH MIA HOUSE |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR ABDULLAH MIA HOUSE1 |
Completion of work |
-
latitude : 26.8552744
Longitude : 89.3741582
file name : Image_27062023150645300.png
|
2023-06-27 15:06:45.389146 |
203 |
77675843 |
INSTALLATION OF SOLAR LIGHT NEAR KALI MANDIR |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR KALI MANDIR1 |
Completion of work |
-
latitude : 26.8554656
Longitude : 89.372789
file name : Image_27062023151041803.png
|
2023-06-27 15:10:41.911814 |
204 |
77664298 |
INSTALLATION OF SOLAR LIGHT NEAR THE HOUSE OF SUMITA |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR THE HOUSE OF SUMITA1 |
Completion of work |
-
latitude : 26.8528092
Longitude : 89.3840589
file name : Image_02082023164858564.png
|
2023-08-02 16:48:58.656781 |
205 |
77671609 |
INSTALLATION OF SOLAR LIGHT NEAR JB MARKET |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR JB MARKET1 |
Completion of work |
-
latitude : 26.8561499
Longitude : 89.3802736
file name : Image_27062023140630315.png
|
2023-06-27 14:06:30.408617 |
206 |
77660828 |
INSTALLATION OF SOLAR LIGHT NEAR MUNNA LEPCHA HOUSE |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR MUNNA LEPCHA HOUSE1 |
Completion of work |
-
latitude : 26.8525698
Longitude : 89.3759284
file name : Image_26062023173452215.png
|
2023-06-26 17:34:52.286319 |
207 |
77663521 |
INSTALLATION OF SOLAR LIGHT NEAR DEEP ROY HOUSE |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR DEEP ROY HOUSE1 |
Completion of work |
-
latitude : 26.857392
Longitude : 89.3767791
file name : Image_02082023164901664.png
|
2023-08-02 16:49:01.74892 |
208 |
77673222 |
INSTALLATION OF SOLAR LIGHT NEAR PURNIMA BARDEWA HOUSE |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR PURNIMA BARDEWA HOUSE1 |
Completion of work |
-
latitude : 26.8557023
Longitude : 89.3793378
file name : Image_27062023133906552.png
|
2023-06-27 13:39:06.623849 |
209 |
77672446 |
INSTALLATION OF SOLAR LIGHT NEAR BIKASH SEWA HOUSE |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR BIKASH SEWA HOUSE1 |
Completion of work |
-
latitude : 26.8562936
Longitude : 89.3785057
file name : Image_27062023140634257.png
|
2023-06-27 14:06:34.349349 |
210 |
77658078 |
INSTALLATION OF SOLAR LIGHT NEAR SUBBA HOUSE |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR SUBBA HOUSE1 |
Completion of work |
-
latitude : 26.85796
Longitude : 89.3728615
file name : Image_26062023171541613.png
|
2023-06-26 17:15:41.686625 |
211 |
77661669 |
INSTALLATION OF SOLAR LIGHT NEAR SIDHU JAISWAL HOUSE |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR SIDHU JAISWAL HOUSE1 |
Completion of work |
-
latitude : 26.859693
Longitude : 89.3773326
file name : Image_26062023165200965.png
|
2023-06-26 16:52:01.046107 |
212 |
77668251 |
INSTALLATION OF SOLAR LIGHT NEAR SHANTI ORAON HOUSE |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR SHANTI ORAON HOUSE1 |
Completion of work |
-
latitude : 26.8589267
Longitude : 89.3765268
file name : Image_26062023164152289.png
|
2023-06-26 16:41:52.361267 |
213 |
77670447 |
INSTALLATION OF SOLAR LIGHT NEAR TSHERING LAMA HOUSE |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR TSHERING LAMA HOUSE1 |
Completion of work |
-
latitude : 26.8559774
Longitude : 89.379077
file name : Image_26062023174405140.png
|
2023-06-26 17:44:05.313616 |
214 |
77662745 |
INSTALLATION OF SOLAR LIGHT NEAR SHMD SCHOOL |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR SHMD SCHOOL1 |
Completion of work |
-
latitude : 26.8544886
Longitude : 89.3805204
file name : Image_27062023174835734.png
|
2023-06-27 17:48:35.815294 |
215 |
77677473 |
INSTALLATION OF SOLAR LIGHT NEAR SHYAM SUNDAR LAKHOTIA |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR SHYAM SUNDAR LAKHOTIA1 |
Completion of work |
-
latitude : 26.8525684
Longitude : 89.3759176
file name : Image_26062023192149433.png
|
2023-06-26 19:21:49.507494 |
216 |
77679886 |
INTALLATION SOLAR LIGHT NEAR BASANT CHHETRI HOUSE |
34900 |
INTALLATION SOLAR LIGHT NEAR BASANT CHHETRI HOUSE1 |
Completion of work |
-
latitude : 26.8525741
Longitude : 89.3759294
file name : Image_26062023174001994.png
|
2023-06-26 17:40:02.078331 |
217 |
77680589 |
INSTALLATION OF SOLAR LIGHT NEAR ADRESH SCHOOL |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR ADRESH SCHOOL1 |
Completion of work |
-
latitude : 26.8588946
Longitude : 89.3829555
file name : Image_26062023192419820.png
|
2023-06-26 19:24:19.905556 |
218 |
77681368 |
INSTALLATION OF SOALR LIGHT NEAR RAJASTHAN BHAJANALAY |
34900 |
INSTALLATION OF SOALR LIGHT NEAR RAJASTHAN BHAJANALAY1 |
Completion of work |
-
latitude : 26.8585848
Longitude : 89.3831617
file name : Image_26062023192154189.png
|
2023-06-26 19:21:54.269981 |
219 |
77683098 |
INSTALLATION OF SOLAR LIGHT NEAR JITENDRA DEBNATH HOUSE |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR JITENDRA DEBNATH HOUSE1 |
Completion of work |
-
latitude : 26.8551505
Longitude : 89.3746016
file name : Image_27062023152220375.png
|
2023-06-27 15:22:20.452078 |
220 |
77684580 |
INSTALLATION OF SOLAR LIGHT NEAR SHIWLI MANDAL HOUSE |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR SHIWLI MANDAL HOUSE1 |
Completion of work |
-
latitude : 26.8570998
Longitude : 89.3792742
file name : Image_27062023162548999.png
|
2023-06-27 16:25:49.096421 |
221 |
77685841 |
INSTALLATION OF SOLAR LIGHT NEAR ST MARCHALE CHURCH |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR ST MARCHALE CHURCH1 |
Completion of work |
-
latitude : 26.8562116
Longitude : 89.3832797
file name : Image_02082023164855448.png
|
2023-08-02 16:48:55.533613 |
222 |
77686459 |
INSTALLATION OF SOLAR LIGHT NEAR BHIM PRASAD SHARMA HOUSE |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR BHIM PRASAD SHARMA HOUSE1 |
Completion of work |
-
latitude : 26.8544684
Longitude : 89.3826268
file name : Image_27062023174839446.png
|
2023-06-27 17:48:39.539703 |
223 |
77686459 |
INSTALLATION OF SOLAR LIGHT NEAR BHIM PRASAD SHARMA HOUSE |
34900 |
INSTALLATION OF SOLAR LIGHT NEAR BHIM PRASAD SHARMA HOUSE1 |
Completion of work |
-
latitude : 26.8547871
Longitude : 89.3824751
file name : Image_02082023164852390.png
|
2023-08-02 16:48:52.472514 |
224 |
66526543 |
Construction of Toilet and Ramp at Nazrul Smriti High Madrasa |
90000 |
Construction of Toilet and Ramp at Nazrul Smriti High Madrasa1 |
Completion of work |
-
latitude : 26.8548705,26.8548705,26.8548705
Longitude : 89.3746007,89.3746007,89.3746007
file name : Image_11082023183217123.png
|
2023-08-11 18:32:17.200955 |
225 |
66509297 |
Renovation of Approach Road of Sunrise School |
90000 |
Renovation of Approach Road of Sunrise School1 |
Completion of work |
-
latitude : 26.8569239,26.8569239,26.8569239
Longitude : 89.3827355,89.3827355,89.3827355
file name : Image_11082023173411321.png
|
2023-08-11 17:34:11.400607 |
226 |
47702228 |
Construction of PCC Road from Buddha Paul to Sukanta Pry School at sansad VII |
89910 |
Construction of PCC Road from Buddha Paul to Sukanta Pry School at sansad VII1 |
Completion of work |
-
latitude : 26.8564915,26.8564915,26.8564915
Longitude : 89.3755518,89.3755518,89.3755518
file name : Image_11082023185757499.png
|
2023-08-11 18:57:57.574149 |
227 |
66509323 |
Renovation of Approach Road of Eden School |
90000 |
Renovation of Approach Road of Eden School1 |
Completion of work |
-
latitude : 26.8522524,26.8522524,26.8522524
Longitude : 89.3798357,89.3798357,89.3798357
file name : Image_11082023171908875.png
|
2023-08-11 17:19:08.953466 |
228 |
77652636 |
Creation of drainage channel for management of grey water |
99174 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.8563734
Longitude : 89.3752246
file name : Image_11082023183642181.png
|
2023-08-11 18:36:42.290604 |
229 |
66571060 |
Renovation of office building |
99719 |
Renovation of office building 1 |
Completion of work |
-
latitude : 26.8553436
Longitude : 89.3756868
file name : Image_11082023185804238.png
|
2023-08-11 18:58:04.324721 |
230 |
36155262 |
PCC DRAIN DURGA STORE TO JAIGAON SWEET |
94912 |
PCC DRAIN DURGA STORE TO JAIGAON SWEET1 |
Completion of work |
-
latitude : 26.861694,26.861694,26.861694
Longitude : 89.3797053,89.3797053,89.3797053
file name : Image_11082023180727873.png
|
2023-08-11 18:07:27.954821 |
231 |
36155262 |
PCC DRAIN DURGA STORE TO JAIGAON SWEET |
94912 |
PCC DRAIN DURGA STORE TO JAIGAON SWEET1 |
Completion of work |
-
latitude : 26.8616843,26.8616843,26.8616843
Longitude : 89.3796748,89.3796748,89.3796748
file name : Image_11082023180731755.png
|
2023-08-11 18:07:31.829532 |
232 |
66526495 |
Approach Road of Adarsh road of English School |
90000 |
Approach Road of Adarsh road of English School1 |
Completion of work |
-
latitude : 26.8538644,26.8538644,26.8538644
Longitude : 89.3832258,89.3832258,89.3832258
file name : Image_11082023172748417.png
|
2023-08-11 17:27:48.505621 |
233 |
66526438 |
Construction of Approach roach and ramp at Jharna busty SSK and ICDS Center |
90000 |
Construction of Approach roach and ramp at Jharna busty SSK and ICDS Center1 |
Completion of work |
-
latitude : 26.8535944,26.8535944,26.8535944
Longitude : 89.3838769,89.3838769,89.3838769
file name : Image_11082023172519662.png
|
2023-08-11 17:25:19.742504 |
234 |
66509490 |
Painting and Construction of Ramp and repair of approach road of New subhash pally ssk |
90000 |
Painting and Construction of Ramp and repair of approach road of New subhash pally ssk1 |
Completion of work |
-
latitude : 26.8575665
Longitude : 89.3717918
file name : Image_11082023181604276.png
|
2023-08-11 18:16:04.356092 |
235 |
66509453 |
Renovation and Ramp Making at Terapanth Bhawan |
90000 |
Renovation and Ramp Making at Terapanth Bhawan1 |
Completion of work |
-
latitude : 26.8571579
Longitude : 89.3797298
file name : Image_11082023180106035.png
|
2023-08-11 18:01:06.12088 |
236 |
66509396 |
Construction of Ramp at BB English School |
90000 |
Construction of Ramp at BB English School 1 |
Completion of work |
-
latitude : 26.8559766
Longitude : 89.3756828
file name : Image_11082023184032739.png
|
2023-08-11 18:40:32.818005 |
237 |
66509345 |
Renvation of Ramp making at Jaigaon Community Hall |
90000 |
Renvation of Ramp making at Jaigaon Community Hall1 |
Completion of work |
-
latitude : 26.8543787,26.8543787
Longitude : 89.3772958,89.3772958
file name : Image_11082023170212820.png
|
2023-08-11 17:02:12.939875 |
238 |
66526585 |
Construction of Approach road and ramp at Jaigaon Hindi Jr High School |
90000 |
Construction of Approach road and ramp at Jaigaon Hindi Jr High School1 |
Completion of work |
-
latitude : 26.8525338,26.8525338,26.8525338
Longitude : 89.3722818,89.3722818,89.3722818
file name : Image_11082023182853521.png
|
2023-08-11 18:28:53.602151 |
239 |
47696899 |
Construction of Slab Culvert near Chowpathi of Md Lutfar Raheman Shop at Sansad XV |
99274 |
Construction of Slab Culvert near Chowpathi of Md Lutfar Raheman Shop at Sansad XV1 |
Completion of work |
-
latitude : 26.8524658,26.8524658
Longitude : 89.37010486,89.37010486
file name : Image_14082023162241871.png
|
2023-08-14 16:22:41.951922 |
240 |
66526690 |
Construction of Ramp at Dharmasala HMD Road |
40000 |
Construction of Ramp at Dharmasala HMD Road1 |
Completion of work |
-
latitude : 26.8615431
Longitude : 89.3792272
file name : Image_11082023175500016.png
|
2023-08-11 17:55:00.093731 |
241 |
48007271 |
Construction of PCC Road from Tapan Saha to Singh House |
99373 |
Construction of PCC Road from Tapan Saha to Singh House1 |
Completion of work |
-
latitude : 26.8561302,26.8561302,26.8561302,26.8561302
Longitude : 89.3772028,89.3772028,89.3772028,89.3772028
file name : Image_14082023153440381.png
|
2023-08-14 15:34:40.477602 |
242 |
58075519 |
Const of PCC Road from Babli Mia to Maznu Mia House at part 11 by 9 and 10 |
300000 |
Const of PCC Road from Babli Mia to Maznu Mia House at part 11 by 9 and 101 |
Completion of work |
-
latitude : 26.8562764,26.8562764,26.85623
Longitude : 89.371983,89.371983,89.3719465
file name : Image_11082023182433760.png
|
2023-08-11 18:24:33.83465 |
243 |
77649251 |
CONS OF CC ROAD FROM NAZRUL HOUSE TO KACHUMUDDIN |
181845 |
CONS OF CC ROAD FROM NAZRUL HOUSE TO KACHUMUDDIN1 |
Roof laid |
-
latitude : 26.85560856,26.85560856,26.85560851,26.85560847
Longitude : 89.37674279,89.37674279,89.37674278,89.37674275
file name : Image_14072024162840308.png
|
2024-07-14 16:28:40.406425 |
244 |
77649251 |
CONS OF CC ROAD FROM NAZRUL HOUSE TO KACHUMUDDIN |
181845 |
CONS OF CC ROAD FROM NAZRUL HOUSE TO KACHUMUDDIN1 |
Plinth level |
-
latitude : 26.85541349,26.85541349,26.8554135
Longitude : 89.37668597,89.37668597,89.37668596
file name : Image_30062024223803363.png
|
2024-06-30 22:38:03.4776 |
245 |
77649251 |
CONS OF CC ROAD FROM NAZRUL HOUSE TO KACHUMUDDIN |
181845 |
CONS OF CC ROAD FROM NAZRUL HOUSE TO KACHUMUDDIN1 |
Completion of work |
-
latitude : 26.8555708,26.8555708
Longitude : 89.3765856,89.3765856
file name : Image_29062024195244371.png
|
2024-06-29 19:52:44.486459 |
246 |
58072764 |
Const of PCC Road from Hanuman Mandir to Pradip Kumar Mittal House at part 11 by 1 |
181845 |
Const of PCC Road from Hanuman Mandir to Pradip Kumar Mittal House at part 11 by 11 |
Roof laid |
-
latitude : 26.8570377,26.8570377,26.8570377,26.8570377
Longitude : 89.3793496,89.3793496,89.3793496,89.3793496
file name : Image_14072024165318553.png
|
2024-07-14 16:53:18.667303 |
247 |
58072764 |
Const of PCC Road from Hanuman Mandir to Pradip Kumar Mittal House at part 11 by 1 |
181845 |
Const of PCC Road from Hanuman Mandir to Pradip Kumar Mittal House at part 11 by 11 |
Plinth level |
-
latitude : 26.8570418,26.8570418,26.8570418
Longitude : 89.379314,89.379314,89.379314
file name : Image_30062024223546647.png
|
2024-06-30 22:35:46.747823 |
248 |
58072764 |
Const of PCC Road from Hanuman Mandir to Pradip Kumar Mittal House at part 11 by 1 |
181845 |
Const of PCC Road from Hanuman Mandir to Pradip Kumar Mittal House at part 11 by 11 |
Completion of work |
-
latitude : 26.8571052,26.8571052,26.8571052
Longitude : 89.3792644,89.3792644,89.3792644
file name : Image_29062024184116800.png
|
2024-06-29 18:41:16.911247 |
249 |
70857442 |
Drainage Construction |
350000 |
Drainage Construction1 |
Roof laid |
-
latitude : 26.8554533
Longitude : 89.3827977
file name : Image_24012024191454082.png
|
2024-01-24 19:14:54.203871 |
250 |
70857442 |
Drainage Construction |
350000 |
Drainage Construction1 |
Plinth level |
-
latitude : 26.8554489
Longitude : 89.3827835
file name : Image_24012024190229200.png
|
2024-01-24 19:02:29.303292 |
251 |
70857442 |
Drainage Construction |
350000 |
Drainage Construction1 |
Completion of work |
-
latitude : 26.8554241
Longitude : 89.3827773
file name : Image_08012024165351788.png
|
2024-01-08 16:53:51.895453 |
252 |
71652561 |
Construction of new Piped Water Supply schemes |
462232 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 26.8524002
Longitude : 89.3726774
file name : Image_13022024171015907.png
|
2024-02-13 17:10:16.045487 |
253 |
71652561 |
Construction of new Piped Water Supply schemes |
462232 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 26.8552906
Longitude : 89.3758586
file name : Image_09022024000201906.png
|
2024-02-09 00:02:02.014998 |
254 |
71652561 |
Construction of new Piped Water Supply schemes |
462232 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 26.8526183
Longitude : 89.3727875
file name : Image_08012024175459953.png
|
2024-01-08 17:55:00.071715 |
255 |
71653414 |
Construction of new Piped Water Supply schemes |
466901 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 26.8536194
Longitude : 89.3712573
file name : Image_13022024171908929.png
|
2024-02-13 17:19:09.081455 |
256 |
71653414 |
Construction of new Piped Water Supply schemes |
466901 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 26.8552906
Longitude : 89.3758586
file name : Image_09022024000159233.png
|
2024-02-09 00:01:59.350051 |
257 |
71653414 |
Construction of new Piped Water Supply schemes |
466901 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 26.8537822
Longitude : 89.3714458
file name : Image_08012024174620523.png
|
2024-01-08 17:46:20.655865 |
258 |
71654228 |
Construction of new Piped Water Supply schemes |
462232 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 26.8599094
Longitude : 89.3806806
file name : Image_30062024185843319.png
|
2024-06-30 18:58:43.442189 |
259 |
71654228 |
Construction of new Piped Water Supply schemes |
462232 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 26.8601686
Longitude : 89.3806372
file name : Image_30062024183519062.png
|
2024-06-30 18:35:19.194318 |
260 |
71654228 |
Construction of new Piped Water Supply schemes |
462232 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 26.8600845
Longitude : 89.3806286
file name : Image_29062024185324103.png
|
2024-06-29 18:53:24.219075 |
261 |
71649725 |
Construction of new Piped Water Supply schemes |
462232 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 26.8555983
Longitude : 89.3723288
file name : Image_13022024172457143.png
|
2024-02-13 17:24:57.344606 |
262 |
71649725 |
Construction of new Piped Water Supply schemes |
462232 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 26.8552906
Longitude : 89.3758586
file name : Image_09022024000153965.png
|
2024-02-09 00:01:54.07015 |
263 |
71649725 |
Construction of new Piped Water Supply schemes |
462232 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 26.8562842
Longitude : 89.3721819
file name : Image_17012024144448928.png
|
2024-01-17 14:44:49.095574 |
264 |
57944395 |
Inst of new Rigbore with distribution chamber near Ali Hossain House at part 11 by 22 |
464567 |
Inst of new Rigbore with distribution chamber near Ali Hossain House at part 11 by 221 |
Roof laid |
-
latitude : 26.85609479
Longitude : 89.38440877
file name : Image_05022024174752732.png
|
2024-02-05 17:47:52.866598 |
265 |
57944395 |
Inst of new Rigbore with distribution chamber near Ali Hossain House at part 11 by 22 |
464567 |
Inst of new Rigbore with distribution chamber near Ali Hossain House at part 11 by 221 |
Plinth level |
-
latitude : 26.85605421
Longitude : 89.38414918
file name : Image_05022024173158221.png
|
2024-02-05 17:31:58.35073 |
266 |
57944395 |
Inst of new Rigbore with distribution chamber near Ali Hossain House at part 11 by 22 |
464567 |
Inst of new Rigbore with distribution chamber near Ali Hossain House at part 11 by 221 |
Completion of work |
-
latitude : 26.8553575
Longitude : 89.3757961
file name : Image_01022024182454930.png
|
2024-02-01 18:24:55.096296 |
267 |
72160970 |
Construction of roads |
198000 |
Construction of roads1 |
Roof laid |
-
latitude : 26.8574441,26.8574441,26.8574441,26.8574441,26.8574441
Longitude : 89.3735133,89.3735133,89.3735133,89.3735133,89.3735133
file name : Image_13022024163923127.png
|
2024-02-13 16:39:23.272333 |
268 |
72160970 |
Construction of roads |
198000 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8568209,26.8568209
Longitude : 89.3737698,89.3737698
file name : Image_10022024170253045.png
|
2024-02-10 17:02:53.162259 |
269 |
72160970 |
Construction of roads |
198000 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8574441,26.8574441,26.8574441,26.8574441
Longitude : 89.3735133,89.3735133,89.3735133,89.3735133
file name : Image_01022024190236056.png
|
2024-02-01 19:02:36.17945 |
270 |
71640153 |
Drainage Construction |
308342 |
Drainage Construction1 |
Roof laid |
-
latitude : 26.8582774
Longitude : 89.3796422
file name : Image_24012024175442603.png
|
2024-01-24 17:54:42.70185 |
271 |
71640153 |
Drainage Construction |
308342 |
Drainage Construction1 |
Plinth level |
-
latitude : 26.8582299
Longitude : 89.3796995
file name : Image_24012024174610050.png
|
2024-01-24 17:46:10.14863 |
272 |
71640153 |
Drainage Construction |
308342 |
Drainage Construction1 |
Completion of work |
-
latitude : 26.8584143
Longitude : 89.3794347
file name : Image_15122023161442011.png
|
2023-12-15 16:14:42.155946 |
273 |
70831050 |
Drainage Construction |
308342 |
Drainage Construction1 |
Roof laid |
-
latitude : 26.8557897
Longitude : 89.3752367
file name : Image_24012024183904180.png
|
2024-01-24 18:39:04.282426 |
274 |
70831050 |
Drainage Construction |
308342 |
Drainage Construction1 |
Plinth level |
-
latitude : 26.855733
Longitude : 89.3752752
file name : Image_17012024163602758.png
|
2024-01-17 16:36:02.85386 |
275 |
70831050 |
Drainage Construction |
308342 |
Drainage Construction1 |
Completion of work |
-
latitude : 26.855751
Longitude : 89.375292
file name : Image_15122023151713111.png
|
2023-12-15 15:17:13.2289 |
276 |
70831050 |
Drainage Construction |
308342 |
Drainage Construction1 |
Completion of work |
-
latitude : 26.855751
Longitude : 89.375292
file name : Image_15122023151708288.png
|
2023-12-15 15:17:08.405585 |
277 |
70805337 |
Drainage Construction |
308342 |
Drainage Construction1 |
Roof laid |
-
latitude : 26.8603696
Longitude : 89.3768336
file name : Image_24012024182832329.png
|
2024-01-24 18:28:32.431525 |
278 |
70805337 |
Drainage Construction |
308342 |
Drainage Construction1 |
Plinth level |
-
latitude : 26.8603696
Longitude : 89.3768336
file name : Image_24012024181820795.png
|
2024-01-24 18:18:20.916115 |
279 |
70805337 |
Drainage Construction |
308342 |
Drainage Construction1 |
Completion of work |
-
latitude : 26.86068
Longitude : 89.3764843
file name : Image_15122023164248792.png
|
2023-12-15 16:42:48.904692 |
280 |
70808359 |
Drainage Construction |
308342 |
Drainage Construction1 |
Roof laid |
-
latitude : 26.8539024
Longitude : 89.372301
file name : Image_29102024170449956.png
|
2024-10-29 17:04:50.048353 |
281 |
70808359 |
Drainage Construction |
308342 |
Drainage Construction1 |
Roof laid |
-
latitude : 26.8550619
Longitude : 89.37431112
file name : Image_24012024170142197.png
|
2024-01-24 17:01:42.309293 |
282 |
70808359 |
Drainage Construction |
308342 |
Drainage Construction1 |
Plinth level |
-
latitude : 26.8552329
Longitude : 89.3742197
file name : Image_17012024163759314.png
|
2024-01-17 16:37:59.416342 |
283 |
70808359 |
Drainage Construction |
308342 |
Drainage Construction1 |
Completion of work |
-
latitude : 26.8549276
Longitude : 89.3746135
file name : Image_15122023170458660.png
|
2023-12-15 17:04:58.774167 |
284 |
70828536 |
Drainage Construction |
308342 |
Drainage Construction1 |
Roof laid |
-
latitude : 26.8540928
Longitude : 89.3813609
file name : Image_24012024192613362.png
|
2024-01-24 19:26:13.467221 |
285 |
70828536 |
Drainage Construction |
308342 |
Drainage Construction1 |
Plinth level |
-
latitude : 26.8539545
Longitude : 89.3817269
file name : Image_24012024192054639.png
|
2024-01-24 19:20:54.757464 |
286 |
70828536 |
Drainage Construction |
308342 |
Drainage Construction1 |
Completion of work |
-
latitude : 26.8551418
Longitude : 89.3799045
file name : Image_15122023162412439.png
|
2023-12-15 16:24:12.557928 |
287 |
57944753 |
Installation of Rigbore with distribution chamber near kali mandir at 11 by 7 |
462232 |
Installation of Rigbore with distribution chamber near kali mandir at 11 by 71 |
Roof laid |
-
latitude : 26.857834
Longitude : 89.3773119
file name : Image_29052024180604337.png
|
2024-05-29 18:06:04.453991 |
288 |
57944753 |
Installation of Rigbore with distribution chamber near kali mandir at 11 by 7 |
462232 |
Installation of Rigbore with distribution chamber near kali mandir at 11 by 71 |
Plinth level |
-
latitude : 26.8578047
Longitude : 89.3772879
file name : Image_27052024142434360.png
|
2024-05-27 14:24:34.478353 |
289 |
57944753 |
Installation of Rigbore with distribution chamber near kali mandir at 11 by 7 |
462232 |
Installation of Rigbore with distribution chamber near kali mandir at 11 by 71 |
Completion of work |
-
latitude : 26.85810781
Longitude : 89.37721599
file name : Image_05022024182740663.png
|
2024-02-05 18:27:40.795283 |
290 |
57944017 |
inst of new Rigbore with distribution chamber infront of Brijesh Kanu house at part 11 by 16 |
620000 |
inst of new Rigbore with distribution chamber infront of Brijesh Kanu house at part 11 by 161 |
Roof laid |
-
latitude : 26.8553307
Longitude : 89.3842211
file name : Image_30062024201730209.png
|
2024-06-30 20:17:30.328188 |
291 |
57944017 |
inst of new Rigbore with distribution chamber infront of Brijesh Kanu house at part 11 by 16 |
620000 |
inst of new Rigbore with distribution chamber infront of Brijesh Kanu house at part 11 by 161 |
Roof laid |
-
latitude : 26.8549726
Longitude : 89.384207
file name : Image_30062024195754268.png
|
2024-06-30 19:57:54.393698 |
292 |
57944017 |
inst of new Rigbore with distribution chamber infront of Brijesh Kanu house at part 11 by 16 |
620000 |
inst of new Rigbore with distribution chamber infront of Brijesh Kanu house at part 11 by 161 |
Plinth level |
-
latitude : 26.85557
Longitude : 89.3843312
file name : Image_30062024181640713.png
|
2024-06-30 18:16:40.828034 |
293 |
57944017 |
inst of new Rigbore with distribution chamber infront of Brijesh Kanu house at part 11 by 16 |
620000 |
inst of new Rigbore with distribution chamber infront of Brijesh Kanu house at part 11 by 161 |
Completion of work |
-
latitude : 26.8556478
Longitude : 89.3844402
file name : Image_29062024191215000.png
|
2024-06-29 19:12:15.105829 |
294 |
70847731 |
Drainage Construction |
300000 |
Drainage Construction1 |
Roof laid |
-
latitude : 26.851973
Longitude : 89.3786202
file name : Image_30062024220232579.png
|
2024-06-30 22:02:32.688154 |
295 |
70847731 |
Drainage Construction |
300000 |
Drainage Construction1 |
Plinth level |
-
latitude : 26.8516384
Longitude : 89.3785818
file name : Image_29062024194045068.png
|
2024-06-29 19:40:45.182752 |
296 |
70847731 |
Drainage Construction |
300000 |
Drainage Construction1 |
Plinth level |
-
latitude : 26.8516362
Longitude : 89.3785748
file name : Image_29062024194614312.png
|
2024-06-29 19:46:14.412779 |
297 |
70847731 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 26.8516169
Longitude : 89.3785137
file name : Image_18062024175016040.png
|
2024-06-18 17:50:16.152758 |
298 |
70850106 |
Drainage Construction |
300000 |
Drainage Construction1 |
Roof laid |
-
latitude : 26.8558664
Longitude : 89.3844216
file name : Image_30062024213802872.png
|
2024-06-30 21:38:02.992183 |
299 |
70850106 |
Drainage Construction |
300000 |
Drainage Construction1 |
Plinth level |
-
latitude : 26.8553003
Longitude : 89.3837991
file name : Image_29062024192107901.png
|
2024-06-29 19:21:07.99818 |
300 |
70850106 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 26.855793
Longitude : 89.3839481
file name : Image_07062024174817131.png
|
2024-06-07 17:48:17.252499 |
301 |
72202159 |
Installation Computer and Audio Visual aid |
100000 |
Installation Computer and Audio Visual aid1 |
|
-
latitude : 26.8552885
Longitude : 89.3758448
file name : Image_05032024165543953.png
|
2024-03-05 16:55:44.093818 |
302 |
72202159 |
Installation Computer and Audio Visual aid |
100000 |
Installation Computer and Audio Visual aid2 |
|
-
latitude : 26.8552874
Longitude : 89.3758511
file name : Image_05032024165620093.png
|
2024-03-05 16:56:20.314637 |
303 |
72202159 |
Installation Computer and Audio Visual aid |
100000 |
Installation Computer and Audio Visual aid3 |
|
-
latitude : 26.8552963
Longitude : 89.3758513
file name : Image_05032024165655725.png
|
2024-03-05 16:56:55.926303 |
304 |
72202159 |
Installation Computer and Audio Visual aid |
100000 |
Installation Computer and Audio Visual aid4 |
|
-
latitude : 26.8552847
Longitude : 89.375846
file name : Image_05032024165733273.png
|
2024-03-05 16:57:33.455613 |
305 |
91434565 |
Procurement of Computer for Gram Panchayat Bhawan |
200000 |
Procurement of Computer for Gram Panchayat Bhawan1 |
|
-
latitude : 26.8552817
Longitude : 89.3758765
file name : Image_18092024144207654.png
|
2024-09-18 14:42:07.733953 |
306 |
77860743 |
Repairing of Culvert near Subba House |
183515 |
Repairing of Culvert near Subba House1 |
Roof laid |
-
latitude : 26.8563104,26.8563104,26.8563104,26.8563104
Longitude : 89.3721261,89.3721261,89.3721261,89.3721261
file name : Image_30062024205233972.png
|
2024-06-30 20:52:34.118892 |
307 |
77860743 |
Repairing of Culvert near Subba House |
183515 |
Repairing of Culvert near Subba House1 |
Roof laid |
-
latitude : 26.8562877,26.8562877,26.8562877
Longitude : 89.3722474,89.3722474,89.3722474
file name : Image_30062024203841452.png
|
2024-06-30 20:38:41.569161 |
308 |
77860743 |
Repairing of Culvert near Subba House |
183515 |
Repairing of Culvert near Subba House1 |
Plinth level |
-
latitude : 26.8562783,26.8562783,26.85626
Longitude : 89.3722285,89.3722285,89.3722533
file name : Image_29062024182705501.png
|
2024-06-29 18:27:05.616035 |
309 |
77860743 |
Repairing of Culvert near Subba House |
183515 |
Repairing of Culvert near Subba House1 |
Completion of work |
-
latitude : 26.8562473,26.8562473
Longitude : 89.3721855,89.3721855
file name : Image_19062024183138696.png
|
2024-06-19 18:31:38.828222 |
310 |
77651423 |
CONS OF CC ROAD FROM MINA CHHETRI TO AINUL MIA |
181845 |
CONS OF CC ROAD FROM MINA CHHETRI TO AINUL MIA1 |
Roof laid |
-
latitude : 26.8572215,26.8572215,26.8572215,26.8572215
Longitude : 89.3740897,89.3740897,89.3740897,89.3740897
file name : Image_15072024155846291.png
|
2024-07-15 15:58:46.399845 |
311 |
77651423 |
CONS OF CC ROAD FROM MINA CHHETRI TO AINUL MIA |
181845 |
CONS OF CC ROAD FROM MINA CHHETRI TO AINUL MIA1 |
Roof laid |
-
latitude : 26.8573827,26.8573827,26.8573827,26.8573827
Longitude : 89.3739237,89.3739237,89.3739237,89.3739237
file name : Image_15072024155842136.png
|
2024-07-15 15:58:42.257865 |
312 |
77651423 |
CONS OF CC ROAD FROM MINA CHHETRI TO AINUL MIA |
181845 |
CONS OF CC ROAD FROM MINA CHHETRI TO AINUL MIA1 |
Roof laid |
-
latitude : 26.8573584,26.8573584,26.8573584
Longitude : 89.3739865,89.3739865,89.3739865
file name : Image_15072024155835585.png
|
2024-07-15 15:58:35.697598 |
313 |
77651423 |
CONS OF CC ROAD FROM MINA CHHETRI TO AINUL MIA |
181845 |
CONS OF CC ROAD FROM MINA CHHETRI TO AINUL MIA1 |
Roof laid |
-
latitude : 26.8575927,26.8575927,26.8575927,26.8575927,26.8575927
Longitude : 89.3738918,89.3738918,89.3738918,89.3738918,89.3738918
file name : Image_15072024145037201.png
|
2024-07-15 14:50:37.306231 |
314 |
77651423 |
CONS OF CC ROAD FROM MINA CHHETRI TO AINUL MIA |
181845 |
CONS OF CC ROAD FROM MINA CHHETRI TO AINUL MIA1 |
Plinth level |
-
latitude : 26.8573668,26.8573668,26.8573668
Longitude : 89.3739449,89.3739449,89.3739449
file name : Image_29062024180413360.png
|
2024-06-29 18:04:13.464556 |
315 |
77651423 |
CONS OF CC ROAD FROM MINA CHHETRI TO AINUL MIA |
181845 |
CONS OF CC ROAD FROM MINA CHHETRI TO AINUL MIA1 |
Completion of work |
-
latitude : 26.8574522,26.8574522,26.8574305
Longitude : 89.3739364,89.3739364,89.3740021
file name : Image_15122023143045445.png
|
2023-12-15 14:30:45.51701 |
316 |
77653466 |
Creation of drainage channel for management of grey water |
507135 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.8518884
Longitude : 89.3763073
file name : Image_10082024182237976.png
|
2024-08-10 18:22:38.114367 |
317 |
77653466 |
Creation of drainage channel for management of grey water |
507135 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.8562174
Longitude : 89.3772379
file name : Image_06082024184548054.png
|
2024-08-06 18:45:48.158018 |
318 |
77653466 |
Creation of drainage channel for management of grey water |
507135 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.8565476
Longitude : 89.3771336
file name : Image_06082024182536310.png
|
2024-08-06 18:25:36.426848 |
319 |
77653466 |
Creation of drainage channel for management of grey water |
507135 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.8573814
Longitude : 89.3790839
file name : Image_12082023183544395.png
|
2023-08-12 18:35:44.46017 |
320 |
77646857 |
CONS OF CC ROAD FROM BB SCHOOL TO MANIRUDDIN MIA |
181845 |
CONS OF CC ROAD FROM BB SCHOOL TO MANIRUDDIN MIA1 |
Roof laid |
-
latitude : 26.8575471,26.8575471,26.8575471
Longitude : 89.3738136,89.3738136,89.3738136
file name : Image_14072024165631067.png
|
2024-07-14 16:56:31.176199 |
321 |
77646857 |
CONS OF CC ROAD FROM BB SCHOOL TO MANIRUDDIN MIA |
181845 |
CONS OF CC ROAD FROM BB SCHOOL TO MANIRUDDIN MIA1 |
Plinth level |
-
latitude : 26.8576576,26.8576576
Longitude : 89.3741783,89.3741783
file name : Image_30062024173748872.png
|
2024-06-30 17:37:47.722505 |
322 |
77646857 |
CONS OF CC ROAD FROM BB SCHOOL TO MANIRUDDIN MIA |
181845 |
CONS OF CC ROAD FROM BB SCHOOL TO MANIRUDDIN MIA1 |
Completion of work |
-
latitude : 26.8576847,26.8576847,26.8576847
Longitude : 89.3737211,89.3737211,89.3737211
file name : Image_29062024180644959.png
|
2024-06-29 18:06:45.070673 |
323 |
77646857 |
CONS OF CC ROAD FROM BB SCHOOL TO MANIRUDDIN MIA |
181845 |
CONS OF CC ROAD FROM BB SCHOOL TO MANIRUDDIN MIA1 |
Completion of work |
-
latitude : 26.8575987,26.8575987,26.8575987
Longitude : 89.3737867,89.3737867,89.3737867
file name : Image_15122023143042462.png
|
2023-12-15 14:30:42.530989 |
324 |
89130224 |
Procurement of Furniture |
200000 |
Procurement of Furniture1 |
|
-
latitude : 26.8553
Longitude : 89.3758786
file name : Image_25092024200408098.png
|
2024-09-25 20:04:08.177576 |
325 |
72168832 |
Construction of roads |
296075 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8614705,26.8614705,26.8614705
Longitude : 89.3789587,89.3789587,89.3789587
file name : Image_24102024160350315.png
|
2024-10-24 16:03:50.412374 |
326 |
89125641 |
Construction of roads |
96115 |
Construction of roads1 |
Roof laid |
-
latitude : 26.856217,26.856217
Longitude : 89.3755613,89.3755613
file name : Image_24072024175602419.png
|
2024-07-24 17:56:02.542128 |
327 |
89125641 |
Construction of roads |
96115 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8563117,26.8563117
Longitude : 89.3754528,89.3754528
file name : Image_19072024164719521.png
|
2024-07-19 16:47:19.640199 |
328 |
89125641 |
Construction of roads |
96115 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8564697,26.8564697
Longitude : 89.3757763,89.3757763
file name : Image_15072024161906118.png
|
2024-07-15 16:19:06.253423 |
329 |
89125680 |
Construction of roads |
96115 |
Construction of roads1 |
Roof laid |
-
latitude : 26.8544458,26.8544458
Longitude : 89.3771729,89.3771729
file name : Image_24072024192502708.png
|
2024-07-24 19:25:02.807133 |
330 |
89125680 |
Construction of roads |
96115 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8544446,26.8544446
Longitude : 89.3771697,89.3771697
file name : Image_20072024192202346.png
|
2024-07-20 19:22:02.446526 |
331 |
89125680 |
Construction of roads |
96115 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8544446,26.8544446
Longitude : 89.3771697,89.3771697
file name : Image_20072024192155682.png
|
2024-07-20 19:21:55.784403 |
332 |
89125680 |
Construction of roads |
96115 |
Construction of roads1 |
Completion of work |
-
latitude : 26.85435887,26.85435887
Longitude : 89.37690751,89.37690751
file name : Image_19072024153613283.png
|
2024-07-19 15:36:13.404327 |
333 |
89125595 |
Construction of roads |
96115 |
Construction of roads1 |
Roof laid |
-
latitude : 26.8583855,26.8583855
Longitude : 89.3754585,89.3754585
file name : Image_24072024193445878.png
|
2024-07-24 19:34:45.991502 |
334 |
89125595 |
Construction of roads |
96115 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8585232,26.8585232
Longitude : 89.3754674,89.3754674
file name : Image_20072024192006860.png
|
2024-07-20 19:20:06.965914 |
335 |
89125595 |
Construction of roads |
96115 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8582572,26.8582572
Longitude : 89.3757685,89.3757685
file name : Image_15072024172742373.png
|
2024-07-15 17:27:42.504799 |
336 |
89125552 |
Construction of roads |
94288 |
Construction of roads1 |
Roof laid |
-
latitude : 26.8563201,26.8563201
Longitude : 89.3822847,89.3822847
file name : Image_24072024192508995.png
|
2024-07-24 19:25:09.104859 |
337 |
89125552 |
Construction of roads |
94288 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8563863,26.8563863
Longitude : 89.3821796,89.3821796
file name : Image_20072024192111661.png
|
2024-07-20 19:21:11.766369 |
338 |
89125552 |
Construction of roads |
94288 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8560649,26.8560649
Longitude : 89.3823306,89.3823306
file name : Image_19072024153606252.png
|
2024-07-19 15:36:06.364753 |
339 |
91091499 |
Construction of RAMPS |
96492 |
Construction of RAMPS1 |
Roof laid |
-
latitude : 26.8547621
Longitude : 89.3771126
file name : Image_24072024202807033.png
|
2024-07-24 20:28:07.132545 |
340 |
91091499 |
Construction of RAMPS |
96492 |
Construction of RAMPS1 |
Plinth level |
-
latitude : 26.8544446
Longitude : 89.3771697
file name : Image_20072024192205501.png
|
2024-07-20 19:22:05.756209 |
341 |
91091499 |
Construction of RAMPS |
96492 |
Construction of RAMPS1 |
Plinth level |
-
latitude : 26.8544446
Longitude : 89.3771697
file name : Image_20072024192158839.png
|
2024-07-20 19:21:59.101158 |
342 |
91091499 |
Construction of RAMPS |
96492 |
Construction of RAMPS1 |
Completion of work |
-
latitude : 26.85435896
Longitude : 89.37691159
file name : Image_19072024153616571.png
|
2024-07-19 15:36:16.701856 |
343 |
91091626 |
Construction of RAMPS |
96492 |
Construction of RAMPS1 |
Roof laid |
-
latitude : 26.8525346
Longitude : 89.3722572
file name : Image_24072024202749628.png
|
2024-07-24 20:27:49.725114 |
344 |
91091626 |
Construction of RAMPS |
96492 |
Construction of RAMPS1 |
Plinth level |
-
latitude : 26.8525369
Longitude : 89.37226
file name : Image_20072024192024448.png
|
2024-07-20 19:20:24.555723 |
345 |
91091626 |
Construction of RAMPS |
96492 |
Construction of RAMPS1 |
Completion of work |
-
latitude : 26.8525374
Longitude : 89.3722642
file name : Image_15072024172914406.png
|
2024-07-15 17:29:14.537223 |
346 |
89124644 |
Construction of roads |
96840 |
Construction of roads1 |
Roof laid |
-
latitude : 26.858311,26.858311
Longitude : 89.3782509,89.3782509
file name : Image_24072024202819723.png
|
2024-07-24 20:28:19.824688 |
347 |
89124644 |
Construction of roads |
96840 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8584502,26.8584502
Longitude : 89.3782581,89.3782581
file name : Image_20072024153435777.png
|
2024-07-20 15:34:35.898376 |
348 |
89124644 |
Construction of roads |
96840 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8588451,26.8588451,26.8588451
Longitude : 89.3782327,89.3782327,89.3782327
file name : Image_15072024172924898.png
|
2024-07-15 17:29:25.029112 |
349 |
89124769 |
Construction of roads |
96090 |
Construction of roads1 |
Roof laid |
-
latitude : 26.8580295,26.8580295
Longitude : 89.3750371,89.3750371
file name : Image_24072024192459530.png
|
2024-07-24 19:24:59.629883 |
350 |
89124769 |
Construction of roads |
96090 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8579861,26.8579861
Longitude : 89.3750562,89.3750562
file name : Image_20072024192003483.png
|
2024-07-20 19:20:03.60567 |
351 |
89124769 |
Construction of roads |
96090 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8578139,26.8578139,26.8578139
Longitude : 89.3750517,89.3750517,89.3750517
file name : Image_15072024172731571.png
|
2024-07-15 17:27:31.697814 |
352 |
89124686 |
Construction of roads |
94288 |
Construction of roads1 |
Roof laid |
-
latitude : 26.8614636,26.8614636
Longitude : 89.3790836,89.3790836
file name : Image_24072024202824280.png
|
2024-07-24 20:28:24.391093 |
353 |
89124686 |
Construction of roads |
94288 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8615562,26.8615562,26.8615562
Longitude : 89.3791654,89.3791654,89.3791654
file name : Image_20072024192033927.png
|
2024-07-20 19:20:34.040888 |
354 |
89124686 |
Construction of roads |
94288 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8614731,26.8614731
Longitude : 89.3790064,89.3790064
file name : Image_15072024172934947.png
|
2024-07-15 17:29:35.095779 |
355 |
89124843 |
Construction of roads |
96840 |
Construction of roads1 |
Roof laid |
-
latitude : 26.8574482,26.8574482
Longitude : 89.3711025,89.3711025
file name : Image_24072024194411564.png
|
2024-07-24 19:44:11.683682 |
356 |
89124843 |
Construction of roads |
96840 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8574786,26.8574786,26.8574786
Longitude : 89.3715077,89.3715077,89.3715077
file name : Image_20072024192017823.png
|
2024-07-20 19:20:17.930557 |
357 |
89124843 |
Construction of roads |
96840 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8575105,26.8575105
Longitude : 89.3716877,89.3716877
file name : Image_15072024172901016.png
|
2024-07-15 17:29:01.146175 |
358 |
89124908 |
Construction of roads |
96840 |
Construction of roads1 |
Roof laid |
-
latitude : 26.8599269,26.8599269
Longitude : 89.374619,89.374619
file name : Image_24072024193717651.png
|
2024-07-24 19:37:17.755516 |
359 |
89124908 |
Construction of roads |
96840 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8600961,26.8600961
Longitude : 89.3746153,89.3746153
file name : Image_20072024192014325.png
|
2024-07-20 19:20:14.429021 |
360 |
89124908 |
Construction of roads |
96840 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8599796,26.8599796,26.8599796
Longitude : 89.3745666,89.3745666,89.3745666
file name : Image_15072024172827543.png
|
2024-07-15 17:28:27.679164 |
361 |
89124966 |
Construction of roads |
96090 |
Construction of roads1 |
Roof laid |
-
latitude : 26.8586277,26.8586277
Longitude : 89.3756484,89.3756484
file name : Image_24072024202815536.png
|
2024-07-24 20:28:15.64216 |
362 |
89124966 |
Construction of roads |
96090 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8585094,26.8585094
Longitude : 89.3755272,89.3755272
file name : Image_20072024192010558.png
|
2024-07-20 19:20:10.661853 |
363 |
89124966 |
Construction of roads |
96090 |
Construction of roads1 |
Completion of work |
-
latitude : 26.858647,26.858647
Longitude : 89.3751235,89.3751235
file name : Image_15072024172806008.png
|
2024-07-15 17:28:06.143706 |
364 |
89125012 |
Construction of roads |
96840 |
Construction of roads1 |
Roof laid |
-
latitude : 26.8562861,26.8562861
Longitude : 89.3755226,89.3755226
file name : Image_24072024175445673.png
|
2024-07-24 17:54:45.83887 |
365 |
89125012 |
Construction of roads |
96840 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8562891,26.8562891
Longitude : 89.3754414,89.3754414
file name : Image_19072024164542990.png
|
2024-07-19 16:45:43.18205 |
366 |
89125012 |
Construction of roads |
96840 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8561159,26.8561113,26.8561113
Longitude : 89.3758564,89.3758532,89.3758532
file name : Image_15072024161521359.png
|
2024-07-15 16:15:21.494506 |
367 |
89125044 |
Construction of roads |
96840 |
Construction of roads1 |
Roof laid |
-
latitude : 26.8525535,26.8525535
Longitude : 89.3723239,89.3723239
file name : Image_24072024202758441.png
|
2024-07-24 20:27:58.549312 |
368 |
89125044 |
Construction of roads |
96840 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8526869,26.8526869
Longitude : 89.3721126,89.3721126
file name : Image_20072024192027528.png
|
2024-07-20 19:20:27.623377 |
369 |
89125044 |
Construction of roads |
96840 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8560843,26.8560843
Longitude : 89.3758925,89.3758925
file name : Image_15072024161608086.png
|
2024-07-15 16:16:08.211179 |
370 |
89125117 |
Construction of roads |
96840 |
Construction of roads1 |
Roof laid |
-
latitude : 26.8544619,26.8544619
Longitude : 89.3740303,89.3740303
file name : Image_24072024202802881.png
|
2024-07-24 20:28:02.9971 |
371 |
89125117 |
Construction of roads |
96840 |
Construction of roads1 |
Plinth level |
-
latitude : 26.85463657,26.85464124
Longitude : 89.37424785,89.37424715
file name : Image_20072024192021221.png
|
2024-07-20 19:20:21.335205 |
372 |
89125117 |
Construction of roads |
96840 |
Construction of roads1 |
Completion of work |
-
latitude : 26.85473025,26.85473025
Longitude : 89.37419974,89.37419974
file name : Image_15072024172920044.png
|
2024-07-15 17:29:20.164529 |
373 |
89125176 |
Construction of roads |
94288 |
Construction of roads1 |
Roof laid |
-
latitude : 26.857208,26.857208,26.857208
Longitude : 89.3798283,89.3798283,89.3798283
file name : Image_24072024192528543.png
|
2024-07-24 19:25:28.689049 |
374 |
89125176 |
Construction of roads |
94288 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8557237,26.8557237
Longitude : 89.3784157,89.3784157
file name : Image_20072024192030709.png
|
2024-07-20 19:20:30.800144 |
375 |
89125176 |
Construction of roads |
94288 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8571647,26.8571647
Longitude : 89.3798045,89.3798045
file name : Image_15072024172929056.png
|
2024-07-15 17:29:29.188032 |
376 |
89125230 |
Construction of roads |
96048 |
Construction of roads1 |
Roof laid |
-
latitude : 26.8554862,26.8554862
Longitude : 89.3810238,89.3810238
file name : Image_24072024192525368.png
|
2024-07-24 19:25:25.481605 |
377 |
89125230 |
Construction of roads |
96048 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8555582,26.8555582
Longitude : 89.3814046,89.3814046
file name : Image_20072024192149149.png
|
2024-07-20 19:21:49.250458 |
378 |
89125230 |
Construction of roads |
96048 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8543763,26.8543763
Longitude : 89.3841561,89.3841561
file name : Image_15072024184425247.png
|
2024-07-15 18:44:25.360175 |
379 |
89125267 |
Construction of roads |
95940 |
Construction of roads1 |
Roof laid |
-
latitude : 26.8523033,26.8523033
Longitude : 89.379943,89.379943
file name : Image_24072024192522158.png
|
2024-07-24 19:25:22.258454 |
380 |
89125267 |
Construction of roads |
95940 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8522819,26.8522819
Longitude : 89.3799137,89.3799137
file name : Image_20072024192152421.png
|
2024-07-20 19:21:52.5367 |
381 |
89125267 |
Construction of roads |
95940 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8522919,26.8522919
Longitude : 89.379917,89.379917
file name : Image_19072024153609668.png
|
2024-07-19 15:36:09.784352 |
382 |
89125327 |
Construction of roads |
96840 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8534954,26.8534954
Longitude : 89.3830535,89.3830535
file name : Image_24072024192512782.png
|
2024-07-24 19:25:12.890549 |
383 |
89125327 |
Construction of roads |
96840 |
Construction of roads1 |
Completion of work |
-
latitude : 26.853831,26.853831
Longitude : 89.3832248,89.3832248
file name : Image_21072024205337418.png
|
2024-07-21 20:53:37.526265 |
384 |
89125327 |
Construction of roads |
96840 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8537635,26.8537635
Longitude : 89.3833883,89.3833883
file name : Image_20072024192045015.png
|
2024-07-20 19:20:45.108593 |
385 |
89125372 |
Construction of roads |
94288 |
Construction of roads1 |
Roof laid |
-
latitude : 26.8544189,26.8544189
Longitude : 89.3842714,89.3842714
file name : Image_24072024192519064.png
|
2024-07-24 19:25:19.165149 |
386 |
89125372 |
Construction of roads |
94288 |
Construction of roads1 |
Plinth level |
-
latitude : 26.85359275,26.85359275
Longitude : 89.38377404,89.38377404
file name : Image_20072024192051620.png
|
2024-07-20 19:20:51.727676 |
387 |
89125372 |
Construction of roads |
94288 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8542024,26.8542024
Longitude : 89.3840221,89.3840221
file name : Image_15072024184419886.png
|
2024-07-15 18:44:19.991489 |
388 |
89125417 |
Construction of roads |
94288 |
Construction of roads1 |
Roof laid |
-
latitude : 26.8536165,26.8536165
Longitude : 89.3837591,89.3837591
file name : Image_24072024192515968.png
|
2024-07-24 19:25:16.070517 |
389 |
89125417 |
Construction of roads |
94288 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8594174,26.8594174
Longitude : 89.3808949,89.3808949
file name : Image_20072024192048243.png
|
2024-07-20 19:20:48.340516 |
390 |
89125417 |
Construction of roads |
94288 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8535996,26.8535996
Longitude : 89.3837969,89.3837969
file name : Image_15072024184415240.png
|
2024-07-15 18:44:15.361535 |
391 |
89125454 |
Construction of roads |
96840 |
Construction of roads1 |
Roof laid |
-
latitude : 26.8601805,26.8601805
Longitude : 89.3817524,89.3817524
file name : Image_24072024202828913.png
|
2024-07-24 20:28:29.014308 |
392 |
89125454 |
Construction of roads |
96840 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8601363,26.8601363
Longitude : 89.3819258,89.3819258
file name : Image_20072024192037301.png
|
2024-07-20 19:20:37.415902 |
393 |
89125454 |
Construction of roads |
96840 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8601235,26.8601235,26.8601235
Longitude : 89.3818173,89.3818173,89.3818173
file name : Image_15072024173226813.png
|
2024-07-15 17:32:26.95008 |
394 |
89125508 |
Construction of roads |
96115 |
Construction of roads1 |
Roof laid |
-
latitude : 26.8569228,26.8569228
Longitude : 89.3828688,89.3828688
file name : Image_24072024192505886.png
|
2024-07-24 19:25:05.993649 |
395 |
89125508 |
Construction of roads |
96115 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8569287,26.8569287
Longitude : 89.382874,89.382874
file name : Image_20072024192040491.png
|
2024-07-20 19:20:40.600779 |
396 |
89125508 |
Construction of roads |
96115 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8569275,26.8569275
Longitude : 89.3828684,89.3828684
file name : Image_15072024184411201.png
|
2024-07-15 18:44:11.322298 |
397 |
57943798 |
Const of Drain with slab from Mohan Agarwal to Shambu Jaiswal house at part 11 by 14 |
297161 |
Const of Drain with slab from Mohan Agarwal to Shambu Jaiswal house at part 11 by 141 |
Plinth level |
-
latitude : 26.8564519,26.8564519,26.8564519
Longitude : 89.3805247,89.3805247,89.3805247
file name : Image_10082024192102020.png
|
2024-08-10 19:21:02.120081 |
398 |
57943798 |
Const of Drain with slab from Mohan Agarwal to Shambu Jaiswal house at part 11 by 14 |
297161 |
Const of Drain with slab from Mohan Agarwal to Shambu Jaiswal house at part 11 by 141 |
Roof laid |
-
latitude : 26.8564542,26.8564542,26.8564542
Longitude : 89.3805125,89.3805125,89.3805125
file name : Image_10082024193421109.png
|
2024-08-10 19:34:21.203317 |
399 |
57943798 |
Const of Drain with slab from Mohan Agarwal to Shambu Jaiswal house at part 11 by 14 |
297161 |
Const of Drain with slab from Mohan Agarwal to Shambu Jaiswal house at part 11 by 141 |
Plinth level |
-
latitude : 26.8564618,26.8564618,26.8564618
Longitude : 89.3805545,89.3805545,89.3805545
file name : Image_10082024191351707.png
|
2024-08-10 19:13:51.79569 |
400 |
57943798 |
Const of Drain with slab from Mohan Agarwal to Shambu Jaiswal house at part 11 by 14 |
297161 |
Const of Drain with slab from Mohan Agarwal to Shambu Jaiswal house at part 11 by 141 |
Completion of work |
-
latitude : 26.856503,26.856503,26.856503
Longitude : 89.3806703,89.3806703,89.3806703
file name : Image_22052023160054320.png
|
2023-05-22 16:00:54.395511 |
401 |
57942977 |
Const of Drain with slab cover from Manik Sen to Chakra Sarki House at part no 11 by 7 |
507135 |
Const of Drain with slab cover from Manik Sen to Chakra Sarki House at part no 11 by 71 |
Roof laid |
-
latitude : 26.8518843,26.8518843,26.8518843
Longitude : 89.3763274,89.3763274,89.3763274
file name : Image_10082024181144091.png
|
2024-08-10 18:11:44.184416 |
402 |
57942977 |
Const of Drain with slab cover from Manik Sen to Chakra Sarki House at part no 11 by 7 |
507135 |
Const of Drain with slab cover from Manik Sen to Chakra Sarki House at part no 11 by 71 |
Plinth level |
-
latitude : 26.8519014,26.8519014,26.8519014
Longitude : 89.3764224,89.3764224,89.3764224
file name : Image_10082024175952483.png
|
2024-08-10 17:59:52.596856 |
403 |
57942977 |
Const of Drain with slab cover from Manik Sen to Chakra Sarki House at part no 11 by 7 |
507135 |
Const of Drain with slab cover from Manik Sen to Chakra Sarki House at part no 11 by 71 |
Completion of work |
-
latitude : 26.85194255,26.85194255,26.85194255
Longitude : 89.3763299,89.3763299,89.3763299
file name : Image_02082023180039637.png
|
2023-08-02 18:00:39.734162 |
404 |
57943441 |
Const of Drain from Mahabul Miya to Ganga Ray House at part no 11 by 11 |
234642 |
Const of Drain from Mahabul Miya to Ganga Ray House at part no 11 by 111 |
Roof laid |
-
latitude : 26.8559834,26.8559834,26.8559834,26.8559834
Longitude : 89.3761784,89.3761784,89.3761784,89.3761784
file name : Image_10082024171721717.png
|
2024-08-10 17:17:21.812647 |
405 |
57943441 |
Const of Drain from Mahabul Miya to Ganga Ray House at part no 11 by 11 |
234642 |
Const of Drain from Mahabul Miya to Ganga Ray House at part no 11 by 111 |
Plinth level |
-
latitude : 26.8555219,26.8555219,26.8555219,26.8555219
Longitude : 89.3768575,89.3768575,89.3768575,89.3768575
file name : Image_10082024165303785.png
|
2024-08-10 16:53:03.885445 |
406 |
57943441 |
Const of Drain from Mahabul Miya to Ganga Ray House at part no 11 by 11 |
234642 |
Const of Drain from Mahabul Miya to Ganga Ray House at part no 11 by 111 |
Completion of work |
-
latitude : 26.85571688,26.8557073
Longitude : 89.37676696,89.37675836
file name : Image_17052023164601705.png
|
2023-05-17 16:46:01.891349 |
407 |
66508485 |
Creation of drainage channel for management of grey water |
194389 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.8552144,26.8552144,26.8552108
Longitude : 89.3757613,89.3757613,89.3757525
file name : Image_10082024164735908.png
|
2024-08-10 16:47:36.015773 |
408 |
66508485 |
Creation of drainage channel for management of grey water |
194389 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.85495824,26.85495824,26.85495827
Longitude : 89.37551882,89.37551882,89.37551879
file name : Image_10082024152807741.png
|
2024-08-10 15:28:07.855507 |
409 |
66508485 |
Creation of drainage channel for management of grey water |
194389 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.8550625,26.8550625,26.8550625
Longitude : 89.3755301,89.3755301,89.3755301
file name : Image_10082024144245840.png
|
2024-08-10 14:42:45.944865 |
410 |
66508485 |
Creation of drainage channel for management of grey water |
194389 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.8553082,26.8553082,26.8553082
Longitude : 89.3758362,89.3758362,89.3758362
file name : Image_02082023174219543.png
|
2023-08-02 17:42:19.617662 |
411 |
66508485 |
Creation of drainage channel for management of grey water |
194389 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.85635962,26.85636109,26.85636109
Longitude : 89.37656509,89.37656686,89.37656686
file name : Image_02082023173458444.png
|
2023-08-02 17:34:58.531409 |
412 |
72172948 |
Construction of roads |
299778 |
Construction of roads1 |
Plinth level |
-
latitude : 26.8538697,26.8538697,26.8538697
Longitude : 89.3716152,89.3716152,89.3716152
file name : Image_31102024132846157.png
|
2024-10-31 13:28:46.234864 |
413 |
72172948 |
Construction of roads |
299778 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8548594,26.8548594,26.8548594
Longitude : 89.3717365,89.3717365,89.3717365
file name : Image_28102024150819603.png
|
2024-10-28 15:08:19.717402 |
414 |
72157405 |
Construction of roads |
150416 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8552861,26.8552861
Longitude : 89.3715925,89.3715925
file name : Image_29102024171753960.png
|
2024-10-29 17:17:54.261785 |
415 |
72166769 |
Construction of roads |
299778 |
Construction of roads1 |
Completion of work |
-
latitude : 26.8602292,26.8602292
Longitude : 89.3802895,89.3802895
file name : Image_06112024125424357.png
|
2024-11-06 12:54:24.445855 |
416 |
66508919 |
Purchase of Sanitary Pad Dispenser |
97000 |
Purchase of Sanitary Pad Dispenser1 |
Roof laid |
-
latitude : 26.8565835
Longitude : 89.3755338
file name : Image_06082024181515106.png
|
2024-08-06 18:15:15.204731 |
417 |
66508919 |
Purchase of Sanitary Pad Dispenser |
97000 |
Purchase of Sanitary Pad Dispenser1 |
Plinth level |
-
latitude : 26.8562613
Longitude : 89.3755357
file name : Image_06082024175436117.png
|
2024-08-06 17:54:36.227688 |
418 |
66508919 |
Purchase of Sanitary Pad Dispenser |
97000 |
Purchase of Sanitary Pad Dispenser1 |
Completion of work |
-
latitude : 26.8559416
Longitude : 89.3757132
file name : Image_06082024173446643.png
|
2024-08-06 17:34:46.769952 |
419 |
66508919 |
Purchase of Sanitary Pad Dispenser |
97000 |
Purchase of Sanitary Pad Dispenser1 |
Completion of work |
-
latitude : 26.8561186
Longitude : 89.3760884
file name : Image_24022023144701333.png
|
2023-02-24 14:47:01.416483 |
420 |
36155338 |
PCC DRAIN BABULAL MUNDRA TO LALAN KANU |
347747 |
PCC DRAIN BABULAL MUNDRA TO LALAN KANU1 |
Roof laid |
-
latitude : 26.8615608,26.861628,26.861628
Longitude : 89.379355,89.379477,89.379477
file name : Image_25102021153549929.png
|
2021-10-25 15:35:50.03451 |
421 |
36155338 |
PCC DRAIN BABULAL MUNDRA TO LALAN KANU |
347747 |
PCC DRAIN BABULAL MUNDRA TO LALAN KANU1 |
Completion of work |
-
latitude : 26.8616293,26.8616012
Longitude : 89.3794617,89.3794009
file name : Image_25102021125902294.png
|
2021-10-25 12:59:02.384213 |
422 |
36155338 |
PCC DRAIN BABULAL MUNDRA TO LALAN KANU |
347747 |
PCC DRAIN BABULAL MUNDRA TO LALAN KANU1 |
Completion of work |
-
latitude : 26.8615548,26.8616169
Longitude : 89.3793533,89.379419
file name : Image_05102021155311902.png
|
2021-10-05 15:53:12.011664 |
423 |
36216447 |
PCC ROAD VIA NOORNABI TO AT GUABARI |
349066 |
PCC ROAD VIA NOORNABI TO AT GUABARI1 |
Plinth level |
-
latitude : 26.8545541,26.8545541,26.8545212
Longitude : 89.3733906,89.3733906,89.3733806
file name : Image_22122021153002684.png
|
2021-12-22 15:30:02.833987 |
424 |
36216447 |
PCC ROAD VIA NOORNABI TO AT GUABARI |
349066 |
PCC ROAD VIA NOORNABI TO AT GUABARI1 |
Plinth level |
-
latitude : 26.8543471,26.8543471
Longitude : 89.3733139,89.3733139
file name : Image_20122021131038981.png
|
2021-12-20 13:10:39.073293 |
425 |
36216447 |
PCC ROAD VIA NOORNABI TO AT GUABARI |
349066 |
PCC ROAD VIA NOORNABI TO AT GUABARI1 |
Completion of work |
-
latitude : 26.8544331,26.8544331
Longitude : 89.3733239,89.3733239
file name : Image_25112021154415471.png
|
2021-11-25 15:44:15.591785 |
426 |
35366560 |
CONSTRUCTION OF PCC DRAIN WITH SLAB FROM THE HOUSE OF MAYA DEVI SHARMA TO GITA GIRI |
367404 |
CONSTRUCTION OF PCC DRAIN WITH SLAB FROM THE HOUSE OF MAYA DEVI SHARMA TO GITA GIRI1 |
Roof laid |
-
latitude : 26.8594887,26.8594887,26.8594887
Longitude : 89.3819263,89.3819263,89.3819263
file name : Image_23022022150108440.png
|
2022-02-23 15:01:08.547152 |
427 |
35366560 |
CONSTRUCTION OF PCC DRAIN WITH SLAB FROM THE HOUSE OF MAYA DEVI SHARMA TO GITA GIRI |
367404 |
CONSTRUCTION OF PCC DRAIN WITH SLAB FROM THE HOUSE OF MAYA DEVI SHARMA TO GITA GIRI1 |
Plinth level |
-
latitude : 26.859315,26.859315,26.859315
Longitude : 89.3821011,89.3821011,89.3821011
file name : Image_08022022155705717.png
|
2022-02-08 15:57:05.802705 |
428 |
35366560 |
CONSTRUCTION OF PCC DRAIN WITH SLAB FROM THE HOUSE OF MAYA DEVI SHARMA TO GITA GIRI |
367404 |
CONSTRUCTION OF PCC DRAIN WITH SLAB FROM THE HOUSE OF MAYA DEVI SHARMA TO GITA GIRI1 |
Completion of work |
-
latitude : 26.85937387,26.85938228,26.85938419
Longitude : 89.38188043,89.38188637,89.38188729
file name : Image_02022022145929195.png
|
2022-02-02 14:59:29.306771 |
429 |
39103933 |
CONSTRUCTION OF DRAIN FROM TOTON DEY HOUSE TO SUKANTA SCHOOL |
265066 |
CONSTRUCTION OF DRAIN FROM TOTON DEY HOUSE TO SUKANTA SCHOOL1 |
Plinth level |
-
latitude : 26.8565029,26.8565029
Longitude : 89.3762714,89.3762714
file name : Image_05102021163126387.png
|
2021-10-05 16:31:26.482356 |
430 |
39103933 |
CONSTRUCTION OF DRAIN FROM TOTON DEY HOUSE TO SUKANTA SCHOOL |
265066 |
CONSTRUCTION OF DRAIN FROM TOTON DEY HOUSE TO SUKANTA SCHOOL1 |
Completion of work |
-
latitude : 26.8574585,26.8574585,26.85666275
Longitude : 89.3767706,89.3767706,89.37650116
file name : Image_17082021140603643.png
|
2021-08-17 14:06:03.725864 |
431 |
39103933 |
CONSTRUCTION OF DRAIN FROM TOTON DEY HOUSE TO SUKANTA SCHOOL |
265066 |
CONSTRUCTION OF DRAIN FROM TOTON DEY HOUSE TO SUKANTA SCHOOL1 |
Completion of work |
-
latitude : 26.8569077,26.8565118,26.8565512
Longitude : 89.3762534,89.3765648,89.3765442
file name : Image_02072021154928960.png
|
2021-07-02 15:49:29.098964 |
432 |
36212717 |
HIGH DRAIN JAGADISH SARKAR TO HALIMA BEOYA |
367387 |
HIGH DRAIN JAGADISH SARKAR TO HALIMA BEOYA1 |
Roof laid |
-
latitude : 26.8576153,26.8576153,26.8576153
Longitude : 89.3737588,89.3737588,89.3737588
file name : Image_08032022141143031.png
|
2022-03-08 14:11:43.117485 |
433 |
36212717 |
HIGH DRAIN JAGADISH SARKAR TO HALIMA BEOYA |
367387 |
HIGH DRAIN JAGADISH SARKAR TO HALIMA BEOYA1 |
Plinth level |
-
latitude : 26.8576559,26.8576559
Longitude : 89.373691,89.373691
file name : Image_22022022134547098.png
|
2022-02-22 13:45:47.192138 |
434 |
36212717 |
HIGH DRAIN JAGADISH SARKAR TO HALIMA BEOYA |
367387 |
HIGH DRAIN JAGADISH SARKAR TO HALIMA BEOYA1 |
Completion of work |
-
latitude : 26.85765188,26.85765189,26.85765192
Longitude : 89.37397058,89.37397058,89.37397057
file name : Image_16022022161515084.png
|
2022-02-16 16:15:15.152497 |
435 |
36212717 |
HIGH DRAIN JAGADISH SARKAR TO HALIMA BEOYA |
367387 |
HIGH DRAIN JAGADISH SARKAR TO HALIMA BEOYA1 |
Completion of work |
-
latitude : 26.8575416,26.8575416
Longitude : 89.3737433,89.3737433
file name : Image_25012022170121386.png
|
2022-01-25 17:01:21.502652 |
436 |
36229315 |
HILLY UPSTAIRS IMONSINGH TAMANG TO MAMIDUL MIA |
335999 |
HILLY UPSTAIRS IMONSINGH TAMANG TO MAMIDUL MIA1 |
Roof laid |
-
latitude : 26.85371489,26.85371489
Longitude : 89.38539543,89.38539543
file name : Image_27102021171206950.png
|
2021-10-27 17:12:07.030771 |
437 |
36229315 |
HILLY UPSTAIRS IMONSINGH TAMANG TO MAMIDUL MIA |
335999 |
HILLY UPSTAIRS IMONSINGH TAMANG TO MAMIDUL MIA1 |
Completion of work |
-
latitude : 26.85371143,26.85371317,26.85371238
Longitude : 89.38524459,89.38524433,89.3852445
file name : Image_12082021094444372.png
|
2021-08-12 09:44:44.527116 |
438 |
36229315 |
HILLY UPSTAIRS IMONSINGH TAMANG TO MAMIDUL MIA |
335999 |
HILLY UPSTAIRS IMONSINGH TAMANG TO MAMIDUL MIA1 |
Completion of work |
-
latitude : 26.85364494,26.85364503,26.85364554
Longitude : 89.38539695,89.38539665,89.3853968
file name : Image_05072021113901133.png
|
2021-07-05 11:39:01.251426 |
439 |
35361396 |
PCC ROAD FROM HOUSE OF NAJRUL MIYA TO THE HOUSE OF JAINAL MIYA |
285768 |
PCC ROAD FROM HOUSE OF NAJRUL MIYA TO THE HOUSE OF JAINAL MIYA1 |
Completion of work |
-
latitude : 26.53096289,26.53096289,26.8534686
Longitude : 89.53554769,89.53554769,89.3718382
file name : Image_11082021124430324.png
|
2021-08-11 12:44:30.469911 |
440 |
35361396 |
PCC ROAD FROM HOUSE OF NAJRUL MIYA TO THE HOUSE OF JAINAL MIYA |
285768 |
PCC ROAD FROM HOUSE OF NAJRUL MIYA TO THE HOUSE OF JAINAL MIYA1 |
Plinth level |
-
latitude : 26.8552387,26.8552387,26.8552387
Longitude : 89.3758048,89.3758048,89.3758048
file name : Image_07072021150904506.png
|
2021-07-07 15:09:04.633166 |
441 |
35361396 |
PCC ROAD FROM HOUSE OF NAJRUL MIYA TO THE HOUSE OF JAINAL MIYA |
285768 |
PCC ROAD FROM HOUSE OF NAJRUL MIYA TO THE HOUSE OF JAINAL MIYA1 |
Completion of work |
-
latitude : 26.8534659,26.8534659,26.8534659
Longitude : 89.3718381,89.3718381,89.3718381
file name : Image_02072021163851269.png
|
2021-07-02 16:38:51.403321 |
442 |
36223338 |
PCC ROAD MIN BAHADUR THAPA TO RAMSAKHI SHA |
99174 |
PCC ROAD MIN BAHADUR THAPA TO RAMSAKHI SHA1 |
Completion of work |
-
latitude : 26.8539346,26.8539346,26.8539346
Longitude : 89.3802548,89.3802548,89.3802548
file name : Image_11082023171451647.png
|
2023-08-11 17:14:51.728527 |
443 |
36217675 |
CONSTRUCTION OF PCC DRAIN FROM THE HOUSE OF SUNIL GUPTA TO SHIV MANDIR |
2640478 |
CONSTRUCTION OF PCC DRAIN FROM THE HOUSE OF SUNIL GUPTA TO SHIV MANDIR1 |
Plinth level |
-
latitude : 26.8575249,26.8575249
Longitude : 89.3796017,89.3796017
file name : Image_08102021181807809.png
|
2021-10-08 18:18:07.925514 |
444 |
36217675 |
CONSTRUCTION OF PCC DRAIN FROM THE HOUSE OF SUNIL GUPTA TO SHIV MANDIR |
2640478 |
CONSTRUCTION OF PCC DRAIN FROM THE HOUSE OF SUNIL GUPTA TO SHIV MANDIR1 |
Completion of work |
-
latitude : 26.858568,26.858568,26.858568,26.8573869
Longitude : 89.377955,89.377955,89.377955,89.3794663
file name : Image_02092021135553340.png
|
2021-09-02 13:55:53.456867 |
445 |
36217675 |
CONSTRUCTION OF PCC DRAIN FROM THE HOUSE OF SUNIL GUPTA TO SHIV MANDIR |
2640478 |
CONSTRUCTION OF PCC DRAIN FROM THE HOUSE OF SUNIL GUPTA TO SHIV MANDIR1 |
Completion of work |
-
latitude : 26.8602005,26.8602005
Longitude : 89.3801808,89.3801808
file name : Image_02072021173851145.png
|
2021-07-02 17:38:51.263152 |
446 |
36217675 |
CONSTRUCTION OF PCC DRAIN FROM THE HOUSE OF SUNIL GUPTA TO SHIV MANDIR |
2640478 |
CONSTRUCTION OF PCC DRAIN FROM THE HOUSE OF SUNIL GUPTA TO SHIV MANDIR1 |
Completion of work |
-
latitude : 26.8569013,26.8578922
Longitude : 89.3794625,89.3800356
file name : Image_25062021170914744.png
|
2021-06-25 17:09:14.840414 |
447 |
36231546 |
REPAIRING OF DRAIN ANKUSH ENGINEERING TO GOUTAM GOSWAMI |
268800 |
REPAIRING OF DRAIN ANKUSH ENGINEERING TO GOUTAM GOSWAMI1 |
Roof laid |
-
latitude : 26.8550168,26.8550168
Longitude : 89.3831037,89.3831037
file name : Image_08102021181802030.png
|
2021-10-08 18:18:02.116821 |
448 |
36231546 |
REPAIRING OF DRAIN ANKUSH ENGINEERING TO GOUTAM GOSWAMI |
268800 |
REPAIRING OF DRAIN ANKUSH ENGINEERING TO GOUTAM GOSWAMI1 |
Plinth level |
-
latitude : 26.8548377,26.8548377,26.854942
Longitude : 89.3832797,89.3832797,89.3831429
file name : Image_07072021123319972.png
|
2021-07-07 12:33:20.302713 |
449 |
36231546 |
REPAIRING OF DRAIN ANKUSH ENGINEERING TO GOUTAM GOSWAMI |
268800 |
REPAIRING OF DRAIN ANKUSH ENGINEERING TO GOUTAM GOSWAMI1 |
Completion of work |
-
latitude : 26.8545607,26.8545607
Longitude : 89.3830711,89.3830711
file name : Image_02072021164841191.png
|
2021-07-02 16:48:41.313381 |
450 |
36231546 |
REPAIRING OF DRAIN ANKUSH ENGINEERING TO GOUTAM GOSWAMI |
268800 |
REPAIRING OF DRAIN ANKUSH ENGINEERING TO GOUTAM GOSWAMI1 |
Completion of work |
-
latitude : 26.8545172,26.8545298
Longitude : 89.383035,89.3830284
file name : Image_25062021113340637.png
|
2021-06-25 11:33:40.7386 |
451 |
34752802 |
PCC DRAIN FROM BIRENDRA TO GREF WALL |
268800 |
PCC DRAIN FROM BIRENDRA TO GREF WALL1 |
Roof laid |
-
latitude : 26.8600951,26.8601021,26.8601021
Longitude : 89.38007,89.3800803,89.3800803
file name : Image_19072021153724740.png
|
2021-07-19 15:37:24.831097 |
452 |
34752802 |
PCC DRAIN FROM BIRENDRA TO GREF WALL |
268800 |
PCC DRAIN FROM BIRENDRA TO GREF WALL1 |
Plinth level |
-
latitude : 26.8600772,26.8600772,26.8600772
Longitude : 89.3800457,89.3800457,89.3800457
file name : Image_05072021161932465.png
|
2021-07-05 16:19:32.791703 |
453 |
34752802 |
PCC DRAIN FROM BIRENDRA TO GREF WALL |
268800 |
PCC DRAIN FROM BIRENDRA TO GREF WALL1 |
Completion of work |
-
latitude : 26.8600915,26.8601098
Longitude : 89.3800536,89.3800673
file name : Image_02072021165738031.png
|
2021-07-02 16:57:38.15165 |
454 |
34752802 |
PCC DRAIN FROM BIRENDRA TO GREF WALL |
268800 |
PCC DRAIN FROM BIRENDRA TO GREF WALL1 |
Completion of work |
-
latitude : 26.8601001,26.8600548
Longitude : 89.3800679,89.3800759
file name : Image_25062021115947263.png
|
2021-06-25 11:59:47.395587 |
455 |
35709167 |
PCC ROAD FROM DHUMRA NAGASIA HOUSE TO BHAGIRATH PRADHAN HOUSE |
287952 |
PCC ROAD FROM DHUMRA NAGASIA HOUSE TO BHAGIRATH PRADHAN HOUSE1 |
Completion of work |
-
latitude : 26.85789704,26.85789702,26.857897
Longitude : 89.37121019,89.37121019,89.3712102
file name : Image_12082021094334372.png
|
2021-08-12 09:43:34.497897 |
456 |
35709167 |
PCC ROAD FROM DHUMRA NAGASIA HOUSE TO BHAGIRATH PRADHAN HOUSE |
287952 |
PCC ROAD FROM DHUMRA NAGASIA HOUSE TO BHAGIRATH PRADHAN HOUSE1 |
Plinth level |
-
latitude : 26.85852411,26.85852382,26.85852149
Longitude : 89.37124762,89.37124815,89.37124935
file name : Image_15072021133124229.png
|
2021-07-15 13:31:24.356185 |
457 |
35709167 |
PCC ROAD FROM DHUMRA NAGASIA HOUSE TO BHAGIRATH PRADHAN HOUSE |
287952 |
PCC ROAD FROM DHUMRA NAGASIA HOUSE TO BHAGIRATH PRADHAN HOUSE1 |
Completion of work |
-
latitude : 26.8580215,26.8580215,26.8580215
Longitude : 89.372885,89.372885,89.372885
file name : Image_07072021150907540.png
|
2021-07-07 15:09:07.652742 |
458 |
70844560 |
Drainage Construction |
302235 |
Drainage Construction1 |
Completion of work |
-
latitude : 26.852374
Longitude : 89.38126
file name : Image_24102024162358423.png
|
2024-10-24 16:23:58.501214 |
459 |
71433149 |
Construction of Paver Block |
149757 |
Construction of Paver Block1 |
Completion of work |
-
latitude : 26.8550385,26.8550385,26.8550385
Longitude : 89.3802536,89.3802536,89.3802536
file name : Image_28102024150825638.png
|
2024-10-28 15:08:25.748504 |
460 |
71437544 |
Construction of Paver Block |
149757 |
Construction of Paver Block1 |
Plinth level |
-
latitude : 26.8573619,26.8573619
Longitude : 89.3767383,89.3767383
file name : Image_05112024170523548.png
|
2024-11-05 17:05:23.641687 |
461 |
71437544 |
Construction of Paver Block |
149757 |
Construction of Paver Block1 |
Completion of work |
-
latitude : 26.8573342,26.8573342,26.8573342
Longitude : 89.3768083,89.3768083,89.3768083
file name : Image_28102024150822615.png
|
2024-10-28 15:08:22.711051 |
462 |
71651553 |
Construction of new Piped Water Supply schemes |
466901 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 26.8565923
Longitude : 89.3784119
file name : Image_29102024173509689.png
|
2024-10-29 17:35:09.790763 |
463 |
70855289 |
Drainage Construction |
302235 |
Drainage Construction1 |
Completion of work |
-
latitude : 26.8579406
Longitude : 89.382567
file name : Image_28102024150816545.png
|
2024-10-28 15:08:16.65353 |
464 |
57943533 |
Const of Drain from Samsul Miya to Abedali Miya House at part no 11 by 12 |
201126 |
Const of Drain from Samsul Miya to Abedali Miya House at part no 11 by 121 |
Roof laid |
-
latitude : 26.8551478,26.8551478,26.8551478,26.8551478
Longitude : 89.3757476,89.3757476,89.3757476,89.3757476
file name : Image_10082024154945908.png
|
2024-08-10 15:49:46.03842 |
465 |
57943533 |
Const of Drain from Samsul Miya to Abedali Miya House at part no 11 by 12 |
201126 |
Const of Drain from Samsul Miya to Abedali Miya House at part no 11 by 121 |
Roof laid |
-
latitude : 26.8550575,26.8550575,26.8550575
Longitude : 89.3755298,89.3755298,89.3755298
file name : Image_10082024154925834.png
|
2024-08-10 15:49:25.955511 |
466 |
57943533 |
Const of Drain from Samsul Miya to Abedali Miya House at part no 11 by 12 |
201126 |
Const of Drain from Samsul Miya to Abedali Miya House at part no 11 by 121 |
Plinth level |
-
latitude : 26.8552515,26.8552515,26.8552515,26.8552515
Longitude : 89.3757985,89.3757985,89.3757985,89.3757985
file name : Image_10082024152335351.png
|
2024-08-10 15:23:35.468438 |
467 |
57943533 |
Const of Drain from Samsul Miya to Abedali Miya House at part no 11 by 12 |
201126 |
Const of Drain from Samsul Miya to Abedali Miya House at part no 11 by 121 |
Completion of work |
-
latitude : 26.85493375,26.85493375,26.85493375,26.85493375
Longitude : 89.37550255,89.37550255,89.37550255,89.37550255
file name : Image_10082024144839992.png
|
2024-08-10 14:48:40.100645 |
468 |
57943533 |
Const of Drain from Samsul Miya to Abedali Miya House at part no 11 by 12 |
201126 |
Const of Drain from Samsul Miya to Abedali Miya House at part no 11 by 121 |
Completion of work |
-
latitude : 26.85499126,26.85499126,26.85499121
Longitude : 89.37548583,89.37548583,89.37548581
file name : Image_22052023182454911.png
|
2023-05-22 18:24:54.976615 |
469 |
66508802 |
Purchase of Sanitary Pad Dispenser |
97000 |
Purchase of Sanitary Pad Dispenser1 |
Roof laid |
-
latitude : 26.8579836
Longitude : 89.3750505
file name : Image_10082024211317204.png
|
2024-08-10 21:13:17.316018 |
470 |
66508802 |
Purchase of Sanitary Pad Dispenser |
97000 |
Purchase of Sanitary Pad Dispenser1 |
Plinth level |
-
latitude : 26.8580245
Longitude : 89.3750293
file name : Image_10082024205213979.png
|
2024-08-10 20:52:14.084965 |
471 |
66508802 |
Purchase of Sanitary Pad Dispenser |
97000 |
Purchase of Sanitary Pad Dispenser1 |
Completion of work |
-
latitude : 26.8552618
Longitude : 89.3758274
file name : Image_24022023154801595.png
|
2023-02-24 15:48:01.667713 |
472 |
66508810 |
Purchase of Sanitary Pad Incinerator |
53000 |
Purchase of Sanitary Pad Incinerator1 |
Plinth level |
-
latitude : 26.8579888
Longitude : 89.375077
file name : Image_23082024165240660.png
|
2024-08-23 16:52:40.776592 |
473 |
66508810 |
Purchase of Sanitary Pad Incinerator |
53000 |
Purchase of Sanitary Pad Incinerator1 |
Completion of work |
-
latitude : 26.855259
Longitude : 89.3758283
file name : Image_24022023154915495.png
|
2023-02-24 15:49:15.585681 |
474 |
39103909 |
CONSTRUCTION OF DRAIN FROM BABLU DEBNATH HOUSE TO BASUDEB PAL HOUSE |
265066 |
CONSTRUCTION OF DRAIN FROM BABLU DEBNATH HOUSE TO BASUDEB PAL HOUSE1 |
Roof laid |
-
latitude : 26.8565226,26.8565226
Longitude : 89.3765512,89.3765512
file name : Image_05102021162939784.png
|
2021-10-05 16:29:39.876076 |
475 |
39103909 |
CONSTRUCTION OF DRAIN FROM BABLU DEBNATH HOUSE TO BASUDEB PAL HOUSE |
265066 |
CONSTRUCTION OF DRAIN FROM BABLU DEBNATH HOUSE TO BASUDEB PAL HOUSE1 |
Plinth level |
-
latitude : 26.8564976,26.8564976,26.8564976
Longitude : 89.3765655,89.3765655,89.3765655
file name : Image_13072021145227509.png
|
2021-07-13 14:52:27.630303 |
476 |
39103909 |
CONSTRUCTION OF DRAIN FROM BABLU DEBNATH HOUSE TO BASUDEB PAL HOUSE |
265066 |
CONSTRUCTION OF DRAIN FROM BABLU DEBNATH HOUSE TO BASUDEB PAL HOUSE1 |
Completion of work |
-
latitude : 26.8565838,26.85636908
Longitude : 89.376384,89.37619682
file name : Image_02072021154656082.png
|
2021-07-02 15:46:56.219968 |
477 |
36219687 |
CONSTRUCTION OF PCC DRAIN FROM THE HOUSE OF GANESH JAISWAL |
283987 |
CONSTRUCTION OF PCC DRAIN FROM THE HOUSE OF GANESH JAISWAL1 |
Roof laid |
-
latitude : 26.8565671,26.8565671,26.8565671
Longitude : 89.3783602,89.3783602,89.3783602
file name : Image_14032022143926644.png
|
2022-03-14 14:39:26.765616 |
478 |
36219687 |
CONSTRUCTION OF PCC DRAIN FROM THE HOUSE OF GANESH JAISWAL |
283987 |
CONSTRUCTION OF PCC DRAIN FROM THE HOUSE OF GANESH JAISWAL1 |
Plinth level |
-
latitude : 26.8564216,26.8564216,26.8564216
Longitude : 89.3784176,89.3784176,89.3784176
file name : Image_08032022165232576.png
|
2022-03-08 16:52:32.69157 |
479 |
36219687 |
CONSTRUCTION OF PCC DRAIN FROM THE HOUSE OF GANESH JAISWAL |
283987 |
CONSTRUCTION OF PCC DRAIN FROM THE HOUSE OF GANESH JAISWAL1 |
Completion of work |
-
latitude : 26.8565162,26.8565162,26.8565162
Longitude : 89.3788653,89.3788653,89.3788653
file name : Image_31012022170939728.png
|
2022-01-31 17:09:39.823535 |
480 |
35403341 |
PCC DRAIN WITH SLAB FROM REKHA GOYEL HOUSE TO ABDUL MANNAN HOUSE |
347454 |
PCC DRAIN WITH SLAB FROM REKHA GOYEL HOUSE TO ABDUL MANNAN HOUSE1 |
Roof laid |
-
latitude : 26.8584632,26.8584632,26.8584632
Longitude : 89.3768987,89.3768987,89.3768987
file name : Image_16112021124308624.png
|
2021-11-16 12:43:08.731747 |
481 |
35403341 |
PCC DRAIN WITH SLAB FROM REKHA GOYEL HOUSE TO ABDUL MANNAN HOUSE |
347454 |
PCC DRAIN WITH SLAB FROM REKHA GOYEL HOUSE TO ABDUL MANNAN HOUSE1 |
Completion of work |
-
latitude : 26.8584572,26.8584572
Longitude : 89.3768898,89.3768898
file name : Image_25102021125910065.png
|
2021-10-25 12:59:10.179617 |
482 |
35403341 |
PCC DRAIN WITH SLAB FROM REKHA GOYEL HOUSE TO ABDUL MANNAN HOUSE |
347454 |
PCC DRAIN WITH SLAB FROM REKHA GOYEL HOUSE TO ABDUL MANNAN HOUSE1 |
Completion of work |
-
latitude : 26.8584886,26.8584781
Longitude : 89.3768413,89.3768448
file name : Image_08102021181759108.png
|
2021-10-08 18:17:59.254567 |
483 |
36230646 |
PCC ROAD RINJIN SUBBA TO ARJUN LAMA |
337158 |
PCC ROAD RINJIN SUBBA TO ARJUN LAMA1 |
Completion of work |
-
latitude : 26.8589917,26.8589917
Longitude : 89.3837271,89.3837271
file name : Image_16112021162248637.png
|
2021-11-16 16:22:48.738648 |
484 |
36230646 |
PCC ROAD RINJIN SUBBA TO ARJUN LAMA |
337158 |
PCC ROAD RINJIN SUBBA TO ARJUN LAMA1 |
Completion of work |
-
latitude : 26.8588959,26.8588959,26.8588939
Longitude : 89.3837567,89.3837567,89.383746
file name : Image_05102021143141933.png
|
2021-10-05 14:31:42.042624 |
485 |
39103977 |
CONSTRUCTION OF DRAIN FROM KALI MANDIR TO MAIN ROAD AT DEOKOTA TOLL |
265066 |
CONSTRUCTION OF DRAIN FROM KALI MANDIR TO MAIN ROAD AT DEOKOTA TOLL1 |
Roof laid |
-
latitude : 26.85780524,26.85780524,26.85780486
Longitude : 89.38169252,89.38169252,89.38169308
file name : Image_17112022165347952.png
|
2022-11-17 16:53:48.039583 |
486 |
39103977 |
CONSTRUCTION OF DRAIN FROM KALI MANDIR TO MAIN ROAD AT DEOKOTA TOLL |
265066 |
CONSTRUCTION OF DRAIN FROM KALI MANDIR TO MAIN ROAD AT DEOKOTA TOLL1 |
Roof laid |
-
latitude : 26.8578692,26.8578692,26.8578692
Longitude : 89.3815717,89.3815717,89.3815717
file name : Image_07042022175302423.png
|
2022-04-07 17:53:02.526178 |
487 |
39103977 |
CONSTRUCTION OF DRAIN FROM KALI MANDIR TO MAIN ROAD AT DEOKOTA TOLL |
265066 |
CONSTRUCTION OF DRAIN FROM KALI MANDIR TO MAIN ROAD AT DEOKOTA TOLL1 |
Plinth level |
-
latitude : 26.857681,26.857681,26.857681
Longitude : 89.3817237,89.3817237,89.3817237
file name : Image_31032022173029300.png
|
2022-03-31 17:30:29.426137 |
488 |
39103977 |
CONSTRUCTION OF DRAIN FROM KALI MANDIR TO MAIN ROAD AT DEOKOTA TOLL |
265066 |
CONSTRUCTION OF DRAIN FROM KALI MANDIR TO MAIN ROAD AT DEOKOTA TOLL1 |
Completion of work |
-
latitude : 26.8577632,26.857726,26.857726
Longitude : 89.3826607,89.3826903,89.3826903
file name : Image_08072021150553452.png
|
2021-07-08 15:05:53.534747 |
489 |
36221876 |
BLOCK TILES MIN BAHADUR THAPA TO RAM SAKHI SHA |
349247 |
BLOCK TILES MIN BAHADUR THAPA TO RAM SAKHI SHA1 |
Roof laid |
-
latitude : 26.8552705,26.8552705
Longitude : 89.3758248,89.3758248
file name : Image_31122021160522066.png
|
2021-12-31 16:05:22.215013 |
490 |
36221876 |
BLOCK TILES MIN BAHADUR THAPA TO RAM SAKHI SHA |
349247 |
BLOCK TILES MIN BAHADUR THAPA TO RAM SAKHI SHA1 |
Plinth level |
-
latitude : 26.85414894,26.85414894
Longitude : 89.38111976,89.38111976
file name : Image_24122021170055110.png
|
2021-12-24 17:00:55.195618 |
491 |
36221876 |
BLOCK TILES MIN BAHADUR THAPA TO RAM SAKHI SHA |
349247 |
BLOCK TILES MIN BAHADUR THAPA TO RAM SAKHI SHA1 |
Completion of work |
-
latitude : 26.8607832,26.8607832,26.8607832
Longitude : 89.3808237,89.3808237,89.3808237
file name : Image_09112021171118356.png
|
2021-11-09 17:11:18.441547 |
492 |
39103816 |
CONSTRUCTION OF DRAIN FROM TASLIMA KHATUN TO TARAK BISWAKARMA |
432600 |
CONSTRUCTION OF DRAIN FROM TASLIMA KHATUN TO TARAK BISWAKARMA1 |
Roof laid |
-
latitude : 26.85774589,26.85774587,26.85774587
Longitude : 89.37788565,89.37788565,89.37788565
file name : Image_29062022161219573.png
|
2022-06-29 16:12:19.652827 |
493 |
39103816 |
CONSTRUCTION OF DRAIN FROM TASLIMA KHATUN TO TARAK BISWAKARMA |
432600 |
CONSTRUCTION OF DRAIN FROM TASLIMA KHATUN TO TARAK BISWAKARMA1 |
Plinth level |
-
latitude : 26.8581973,26.85771424,26.85771462
Longitude : 89.3773628,89.3778451,89.37784679
file name : Image_17052022144203000.png
|
2022-05-17 14:42:03.110042 |
494 |
39103816 |
CONSTRUCTION OF DRAIN FROM TASLIMA KHATUN TO TARAK BISWAKARMA |
432600 |
CONSTRUCTION OF DRAIN FROM TASLIMA KHATUN TO TARAK BISWAKARMA1 |
Completion of work |
-
latitude : 26.8577428,26.8577428,26.8577428
Longitude : 89.3777999,89.3777999,89.3777999
file name : Image_06052022164402150.png
|
2022-05-06 16:44:02.24362 |
495 |
34898621 |
PCC ROAD FROM RINA PRADHAN TO FURI SHERPA |
349894 |
PCC ROAD FROM RINA PRADHAN TO FURI SHERPA1 |
Roof laid |
-
latitude : 26.8596398,26.8596398,26.8596398
Longitude : 89.3801026,89.3801026,89.3801026
file name : Image_22022022143404007.png
|
2022-02-22 14:34:04.077815 |
496 |
34898621 |
PCC ROAD FROM RINA PRADHAN TO FURI SHERPA |
349894 |
PCC ROAD FROM RINA PRADHAN TO FURI SHERPA1 |
Plinth level |
-
latitude : 26.8596683,26.8596679,26.8596679
Longitude : 89.380003,89.3800078,89.3800078
file name : Image_08022022153801382.png
|
2022-02-08 15:38:01.459683 |
497 |
34898621 |
PCC ROAD FROM RINA PRADHAN TO FURI SHERPA |
349894 |
PCC ROAD FROM RINA PRADHAN TO FURI SHERPA1 |
Completion of work |
-
latitude : 26.85961266,26.8596688,26.8596688
Longitude : 89.380179,89.3800033,89.3800033
file name : Image_31012022124110254.png
|
2022-01-31 12:41:10.346193 |
498 |
36226835 |
DRAIN FROM THE HOUSE OF OM PRAKASH AGARWALTO BHAKTA CHOWPATHI |
265066 |
DRAIN FROM THE HOUSE OF OM PRAKASH AGARWALTO BHAKTA CHOWPATHI1 |
Roof laid |
-
latitude : 26.8531481,26.8531481,26.8531481
Longitude : 89.3789199,89.3789199,89.3789199
file name : Image_25042022165129897.png
|
2022-04-25 16:51:29.985192 |
499 |
36226835 |
DRAIN FROM THE HOUSE OF OM PRAKASH AGARWALTO BHAKTA CHOWPATHI |
265066 |
DRAIN FROM THE HOUSE OF OM PRAKASH AGARWALTO BHAKTA CHOWPATHI1 |
Roof laid |
-
latitude : 26.8528811,26.8528811,26.8528811
Longitude : 89.379029,89.379029,89.379029
file name : Image_25042022165250980.png
|
2022-04-25 16:52:51.065121 |
500 |
36226835 |
DRAIN FROM THE HOUSE OF OM PRAKASH AGARWALTO BHAKTA CHOWPATHI |
265066 |
DRAIN FROM THE HOUSE OF OM PRAKASH AGARWALTO BHAKTA CHOWPATHI1 |
Plinth level |
-
latitude : 26.85537852,26.85537852,26.85537852
Longitude : 89.37591943,89.37591943,89.37591943
file name : Image_31032022165116983.png
|
2022-03-31 16:51:17.07438 |
501 |
36226835 |
DRAIN FROM THE HOUSE OF OM PRAKASH AGARWALTO BHAKTA CHOWPATHI |
265066 |
DRAIN FROM THE HOUSE OF OM PRAKASH AGARWALTO BHAKTA CHOWPATHI1 |
Completion of work |
-
latitude : 26.8508451,26.8508451,26.8508451
Longitude : 89.3797315,89.3797315,89.3797315
file name : Image_24082021163328521.png
|
2021-08-24 16:33:28.6259 |
502 |
36226835 |
DRAIN FROM THE HOUSE OF OM PRAKASH AGARWALTO BHAKTA CHOWPATHI |
265066 |
DRAIN FROM THE HOUSE OF OM PRAKASH AGARWALTO BHAKTA CHOWPATHI1 |
Completion of work |
-
latitude : 26.852215,26.852215
Longitude : 89.3788998,89.3788998
file name : Image_08072021155424889.png
|
2021-07-08 15:54:24.999091 |
503 |
34944709 |
PCC ROAD FROM BRIJESH KAUR TO PURNA DAS |
380941 |
PCC ROAD FROM BRIJESH KAUR TO PURNA DAS 1 |
Roof laid |
-
latitude : 26.8602112,26.8602112,26.8602112
Longitude : 89.3744821,89.3744821,89.3744821
file name : Image_08032022133541784.png
|
2022-03-08 13:35:41.877188 |
504 |
34944709 |
PCC ROAD FROM BRIJESH KAUR TO PURNA DAS |
380941 |
PCC ROAD FROM BRIJESH KAUR TO PURNA DAS 1 |
Completion of work |
-
latitude : 26.8602095,26.8602095,26.8602095
Longitude : 89.3744872,89.3744872,89.3744872
file name : Image_27012022161919073.png
|
2022-01-27 16:19:19.200487 |
505 |
36216254 |
PCC ROAD SATYAM PODDAR TO KAILASH SHA AT SUBHASH PALLY |
364121 |
PCC ROAD SATYAM PODDAR TO KAILASH SHA AT SUBHASH PALLY 1 |
Roof laid |
-
latitude : 26.8607255,26.8607255,26.8607255
Longitude : 89.3759721,89.3759721,89.3759721
file name : Image_03032022143432343.png
|
2022-03-03 14:34:32.425049 |
506 |
36216254 |
PCC ROAD SATYAM PODDAR TO KAILASH SHA AT SUBHASH PALLY |
364121 |
PCC ROAD SATYAM PODDAR TO KAILASH SHA AT SUBHASH PALLY 1 |
Plinth level |
-
latitude : 26.86088,26.86088,26.86088
Longitude : 89.3763499,89.3763499,89.3763499
file name : Image_11022022144530350.png
|
2022-02-11 14:45:30.434774 |
507 |
36216254 |
PCC ROAD SATYAM PODDAR TO KAILASH SHA AT SUBHASH PALLY |
364121 |
PCC ROAD SATYAM PODDAR TO KAILASH SHA AT SUBHASH PALLY 1 |
Completion of work |
-
latitude : 26.86073,26.86073,26.8607315
Longitude : 89.3759649,89.3759649,89.3759641
file name : Image_27012022162721182.png
|
2022-01-27 16:27:21.350078 |
508 |
36229842 |
ROAD FROM ICDS CENTRE VIA HAMIL HOUSE VIA ALEYA HOUSE TO SUNIL MEHERA HOUSE |
378550 |
ROAD FROM ICDS CENTRE VIA HAMIL HOUSE VIA ALEYA HOUSE TO SUNIL MEHERA HOUSE 1 |
Roof laid |
-
latitude : 26.8534747,26.8534747,26.8534727
Longitude : 89.3838407,89.3838407,89.3838418
file name : Image_25022022164251419.png
|
2022-02-25 16:42:51.496293 |
509 |
36229842 |
ROAD FROM ICDS CENTRE VIA HAMIL HOUSE VIA ALEYA HOUSE TO SUNIL MEHERA HOUSE |
378550 |
ROAD FROM ICDS CENTRE VIA HAMIL HOUSE VIA ALEYA HOUSE TO SUNIL MEHERA HOUSE 1 |
Plinth level |
-
latitude : 26.85350903,26.85350963,26.85350963
Longitude : 89.38393426,89.38393364,89.38393364
file name : Image_16022022154726592.png
|
2022-02-16 15:47:26.693984 |
510 |
36229842 |
ROAD FROM ICDS CENTRE VIA HAMIL HOUSE VIA ALEYA HOUSE TO SUNIL MEHERA HOUSE |
378550 |
ROAD FROM ICDS CENTRE VIA HAMIL HOUSE VIA ALEYA HOUSE TO SUNIL MEHERA HOUSE 1 |
Completion of work |
-
latitude : 26.853607,26.853607,26.853607
Longitude : 89.3838378,89.3838378,89.3838378
file name : Image_31012022150346023.png
|
2022-01-31 15:03:46.149827 |
511 |
35131469 |
PCC ROAD FROM BRIDGE TO HO TAIBAR MIYA |
371142 |
PCC ROAD FROM BRIDGE TO HO TAIBAR MIYA1 |
Roof laid |
-
latitude : 26.85354837,26.85354846,26.85354856
Longitude : 89.3721941,89.37219403,89.37219481
file name : Image_03032022133250298.png
|
2022-03-03 13:32:50.399933 |
512 |
35131469 |
PCC ROAD FROM BRIDGE TO HO TAIBAR MIYA |
371142 |
PCC ROAD FROM BRIDGE TO HO TAIBAR MIYA1 |
Plinth level |
-
latitude : 26.8541872,26.8541872,26.8541872
Longitude : 89.3735653,89.3735653,89.3735653
file name : Image_27012022155429475.png
|
2022-01-27 15:54:29.59411 |
513 |
35131469 |
PCC ROAD FROM BRIDGE TO HO TAIBAR MIYA |
371142 |
PCC ROAD FROM BRIDGE TO HO TAIBAR MIYA1 |
Completion of work |
-
latitude : 26.85341095,26.85341023,26.85340741
Longitude : 89.37216864,89.37216998,89.37214849
file name : Image_25012022162954529.png
|
2022-01-25 16:29:54.642803 |
514 |
36216362 |
PCC ROAD FROM THE HOUSE VIA HAMIL HOUSE VIA ALEYA HOUSE TO SUNIL MEHERA HOUSE AT JHARNA BASTY |
378853 |
PCC ROAD FROM THE HOUSE VIA HAMIL HOUSE VIA ALEYA HOUSE TO SUNIL MEHERA HOUSE AT JHARNA BASTY1 |
Roof laid |
-
latitude : 26.854828,26.854828,26.8546518
Longitude : 89.3733205,89.3733205,89.373443
file name : Image_08032022144854029.png
|
2022-03-08 14:48:54.132029 |
515 |
36216362 |
PCC ROAD FROM THE HOUSE VIA HAMIL HOUSE VIA ALEYA HOUSE TO SUNIL MEHERA HOUSE AT JHARNA BASTY |
378853 |
PCC ROAD FROM THE HOUSE VIA HAMIL HOUSE VIA ALEYA HOUSE TO SUNIL MEHERA HOUSE AT JHARNA BASTY1 |
Plinth level |
-
latitude : 26.8548312,26.8548312,26.8548312
Longitude : 89.3732256,89.3732256,89.3732256
file name : Image_03032022142418321.png
|
2022-03-03 14:24:18.395865 |
516 |
36216362 |
PCC ROAD FROM THE HOUSE VIA HAMIL HOUSE VIA ALEYA HOUSE TO SUNIL MEHERA HOUSE AT JHARNA BASTY |
378853 |
PCC ROAD FROM THE HOUSE VIA HAMIL HOUSE VIA ALEYA HOUSE TO SUNIL MEHERA HOUSE AT JHARNA BASTY1 |
Plinth level |
-
latitude : 26.85495392,26.85495528,26.85495528
Longitude : 89.37325019,89.37325102,89.37325102
file name : Image_03032022150854085.png
|
2022-03-03 15:08:54.161176 |
517 |
36216362 |
PCC ROAD FROM THE HOUSE VIA HAMIL HOUSE VIA ALEYA HOUSE TO SUNIL MEHERA HOUSE AT JHARNA BASTY |
378853 |
PCC ROAD FROM THE HOUSE VIA HAMIL HOUSE VIA ALEYA HOUSE TO SUNIL MEHERA HOUSE AT JHARNA BASTY1 |
Completion of work |
-
latitude : 26.8548318,26.8548318,26.8548318
Longitude : 89.3732339,89.3732339,89.3732339
file name : Image_31012022165143578.png
|
2022-01-31 16:51:43.726001 |
518 |
35125140 |
CC ROAD FROM BULBULI HOUSE TO NUR MOHAMMAD HOUSE |
375013 |
CC ROAD FROM BULBULI HOUSE TO NUR MOHAMMAD HOUSE1 |
Roof laid |
-
latitude : 26.8566214,26.8566214,26.8566214
Longitude : 89.3737417,89.3737417,89.3737417
file name : Image_29032022150252330.png
|
2022-03-29 15:02:52.407647 |
519 |
35125140 |
CC ROAD FROM BULBULI HOUSE TO NUR MOHAMMAD HOUSE |
375013 |
CC ROAD FROM BULBULI HOUSE TO NUR MOHAMMAD HOUSE1 |
Plinth level |
-
latitude : 26.8568295,26.8568295,26.8568295
Longitude : 89.3738711,89.3738711,89.3738711
file name : Image_25032022161300192.png
|
2022-03-25 16:13:00.272086 |
520 |
35125140 |
CC ROAD FROM BULBULI HOUSE TO NUR MOHAMMAD HOUSE |
375013 |
CC ROAD FROM BULBULI HOUSE TO NUR MOHAMMAD HOUSE1 |
Completion of work |
-
latitude : 26.8567628,26.8567628,26.8567628
Longitude : 89.3739062,89.3739062,89.3739062
file name : Image_25032022145859021.png
|
2022-03-25 14:58:59.111556 |
521 |
36229938 |
ROAD FROM THE HOUSE OF SARASWATI VIA MAJIYA HOUSE, BIMLA RAI GOLI VIA ABUL HOUSE |
378943 |
ROAD FROM THE HOUSE OF SARASWATI VIA MAJIYA HOUSE, BIMLA RAI GOLI VIA ABUL HOUSE1 |
Roof laid |
-
latitude : 26.853475,26.8534747,26.8534747
Longitude : 89.3838399,89.3838416,89.3838416
file name : Image_25022022160251508.png
|
2022-02-25 16:02:51.588377 |
522 |
36229938 |
ROAD FROM THE HOUSE OF SARASWATI VIA MAJIYA HOUSE, BIMLA RAI GOLI VIA ABUL HOUSE |
378943 |
ROAD FROM THE HOUSE OF SARASWATI VIA MAJIYA HOUSE, BIMLA RAI GOLI VIA ABUL HOUSE1 |
Plinth level |
-
latitude : 26.85328838,26.85328838,26.85328836
Longitude : 89.38372887,89.38372893,89.38372894
file name : Image_16022022154052852.png
|
2022-02-16 15:40:52.955507 |
523 |
36229938 |
ROAD FROM THE HOUSE OF SARASWATI VIA MAJIYA HOUSE, BIMLA RAI GOLI VIA ABUL HOUSE |
378943 |
ROAD FROM THE HOUSE OF SARASWATI VIA MAJIYA HOUSE, BIMLA RAI GOLI VIA ABUL HOUSE1 |
Completion of work |
-
latitude : 26.8536076,26.8536076,26.8536076
Longitude : 89.3838315,89.3838315,89.3838315
file name : Image_31012022150728453.png
|
2022-01-31 15:07:28.67397 |
524 |
36231007 |
HIGH CULVERT AT CHINESE ROAD NEAR THE HOUSE OF USHA PRADHAN |
288342 |
HIGH CULVERT AT CHINESE ROAD NEAR THE HOUSE OF USHA PRADHAN 1 |
Roof laid |
-
latitude : 26.8585034,26.8585034,26.8585034
Longitude : 89.3838966,89.3838966,89.3838966
file name : Image_22022022143412830.png
|
2022-02-22 14:34:12.911279 |
525 |
36231007 |
HIGH CULVERT AT CHINESE ROAD NEAR THE HOUSE OF USHA PRADHAN |
288342 |
HIGH CULVERT AT CHINESE ROAD NEAR THE HOUSE OF USHA PRADHAN 1 |
Plinth level |
-
latitude : 26.8589533,26.8589533,26.8589533
Longitude : 89.3837929,89.3837929,89.3837929
file name : Image_11022022153624512.png
|
2022-02-11 15:36:24.619503 |
526 |
36231007 |
HIGH CULVERT AT CHINESE ROAD NEAR THE HOUSE OF USHA PRADHAN |
288342 |
HIGH CULVERT AT CHINESE ROAD NEAR THE HOUSE OF USHA PRADHAN 1 |
Completion of work |
-
latitude : 26.8588594,26.8588594,26.8588594
Longitude : 89.3837788,89.3837788,89.3837788
file name : Image_31012022124545679.png
|
2022-01-31 12:45:45.776992 |
527 |
36220112 |
PCC DRAIN GANGA RAM LAMA TO JAIGAON GP II OFFICE |
364122 |
PCC DRAIN GANGA RAM LAMA TO JAIGAON GP II OFFICE 1 |
Roof laid |
-
latitude : 26.8549912,26.8549912,26.8549912
Longitude : 89.3757929,89.3757929,89.3757929
file name : Image_23022022143817819.png
|
2022-02-23 14:38:17.920228 |
528 |
36220112 |
PCC DRAIN GANGA RAM LAMA TO JAIGAON GP II OFFICE |
364122 |
PCC DRAIN GANGA RAM LAMA TO JAIGAON GP II OFFICE 1 |
Plinth level |
-
latitude : 26.85523238,26.85523238,26.85523231
Longitude : 89.37604223,89.37604223,89.37604219
file name : Image_16022022160400999.png
|
2022-02-16 16:04:01.079382 |
529 |
36220112 |
PCC DRAIN GANGA RAM LAMA TO JAIGAON GP II OFFICE |
364122 |
PCC DRAIN GANGA RAM LAMA TO JAIGAON GP II OFFICE 1 |
Completion of work |
-
latitude : 26.8551294,26.8551294
Longitude : 89.3758136,89.3758136
file name : Image_31012022170343940.png
|
2022-01-31 17:03:44.129192 |
530 |
34942125 |
PCC ROAD FROM S.S.K SCHOOL TO HAJARD LAL SAHA |
99274 |
PCC ROAD FROM S.S.K SCHOOL TO HAJARD LAL SAHA1 |
Completion of work |
-
latitude : 26.8530402,26.8530402,26.8530402,26.8530402
Longitude : 89.3808344,89.3808344,89.3808344,89.3808344
file name : Image_11082023185800836.png
|
2023-08-11 18:58:00.917744 |
531 |
36232327 |
RENOVATION OF MINOR CANAL FOR COMMUNITY FROM NEPALI SCHOOL TO PAL HOUSE |
98901 |
RENOVATION OF MINOR CANAL FOR COMMUNITY FROM NEPALI SCHOOL TO PAL HOUSE1 |
Completion of work |
-
latitude : 26.8560028,26.8560028,26.8560028
Longitude : 89.3806198,89.3806198,89.3806198
file name : Image_12052023174353390.png
|
2023-05-12 17:43:53.47813 |
532 |
36224008 |
DRAIN FROM MAYA THAPA TO SHAMBHU BAITHA |
286512 |
DRAIN FROM MAYA THAPA TO SHAMBHU BAITHA1 |
Completion of work |
-
latitude : 26.855804,26.855804,26.855804
Longitude : 89.379667,89.379667,89.379667
file name : Image_11082023170721175.png
|
2023-08-11 17:07:21.267304 |
533 |
57942616 |
Const of CC Drain with Slab cover from Pritam Diyali to Md Sabuddin Hoiuse at part no 11 by 1 |
200255 |
Const of CC Drain with Slab cover from Pritam Diyali to Md Sabuddin Hoiuse at part no 11 by 11 |
Completion of work |
-
latitude : 26.85830273,26.85830273,26.85830273
Longitude : 89.38022529,89.38022529,89.38022529
file name : Image_15052023172457519.png
|
2023-05-15 17:24:57.591489 |
534 |
57944641 |
Const of Drain with Slab from Amar Karjee to Jayanti Jaiswal House at part 11 by 23 |
200255 |
Const of Drain with Slab from Amar Karjee to Jayanti Jaiswal House at part 11 by 231 |
Completion of work |
-
latitude : 26.8601775,26.8601775,26.8601775
Longitude : 89.3815601,89.3815601,89.3815601
file name : Image_17052023180228725.png
|
2023-05-17 18:02:28.804502 |
535 |
57943353 |
Const of Drain from Atiyar Rahaman to Sumitra Barman House at part 11 by 9 |
200255 |
Const of Drain from Atiyar Rahaman to Sumitra Barman House at part 11 by 91 |
Completion of work |
-
latitude : 26.8554942,26.8554942
Longitude : 89.374188,89.374188
file name : Image_15052023172313003.png
|
2023-05-15 17:23:13.082362 |
536 |
57943353 |
Const of Drain from Atiyar Rahaman to Sumitra Barman House at part 11 by 9 |
200255 |
Const of Drain from Atiyar Rahaman to Sumitra Barman House at part 11 by 91 |
Completion of work |
-
latitude : 26.8567139,26.8567181,26.8567181
Longitude : 89.3738941,89.3738752,89.3738752
file name : Image_17052023180232017.png
|
2023-05-17 18:02:32.095921 |
537 |
77642662 |
Creation of drainage channel for management of grey water |
1504975 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.85667264
Longitude : 89.37289659
file name : Image_23062023173032043.png
|
2023-06-23 17:30:32.126884 |
538 |
66508861 |
Purchase of Sanitary Pad Dispenser |
97000 |
Purchase of Sanitary Pad Dispenser1 |
Completion of work |
-
latitude : 26.8548365
Longitude : 89.3823941
file name : Image_24022023150933893.png
|
2023-02-24 15:09:33.976621 |
539 |
47622886 |
Contraction of PCC Drain from the house of Rahaman Mia to Rahimuddin Mia at Sansad VIII |
354797 |
Contraction of PCC Drain from the house of Rahaman Mia to Rahimuddin Mia at Sansad VIII1 |
Plinth level |
-
latitude : 26.8560029,26.8560029
Longitude : 89.372593,89.372593
file name : Image_02032023173633157.png
|
2023-03-02 17:36:33.251505 |
540 |
47622886 |
Contraction of PCC Drain from the house of Rahaman Mia to Rahimuddin Mia at Sansad VIII |
354797 |
Contraction of PCC Drain from the house of Rahaman Mia to Rahimuddin Mia at Sansad VIII1 |
Roof laid |
-
latitude : 26.8552836,26.8552836,26.8552836
Longitude : 89.3758155,89.3758155,89.3758155
file name : Image_03032023165635597.png
|
2023-03-03 16:56:35.668231 |
541 |
47622886 |
Contraction of PCC Drain from the house of Rahaman Mia to Rahimuddin Mia at Sansad VIII |
354797 |
Contraction of PCC Drain from the house of Rahaman Mia to Rahimuddin Mia at Sansad VIII1 |
Completion of work |
-
latitude : 26.85583449,26.85583427,26.85583427
Longitude : 89.37182209,89.37182202,89.37182202
file name : Image_22022023175504309.png
|
2023-02-22 17:55:04.37778 |
542 |
47624163 |
Construction of PCC Drain with slab from Jannat Bibi House to Gompa at Jharna Busty |
247480 |
Construction of PCC Drain with slab from Jannat Bibi House to Gompa at Jharna Busty1 |
Roof laid |
-
latitude : 26.85612528,26.85612528,26.85612754
Longitude : 89.38445249,89.38445249,89.38445484
file name : Image_23112022131140895.png
|
2022-11-23 13:11:40.964676 |
543 |
47624163 |
Construction of PCC Drain with slab from Jannat Bibi House to Gompa at Jharna Busty |
247480 |
Construction of PCC Drain with slab from Jannat Bibi House to Gompa at Jharna Busty1 |
Plinth level |
-
latitude : 26.85550528,26.85547088,26.85548974
Longitude : 89.38364559,89.38369625,89.38367837
file name : Image_20052022142916522.png
|
2022-05-20 14:29:16.602134 |
544 |
47624163 |
Construction of PCC Drain with slab from Jannat Bibi House to Gompa at Jharna Busty |
247480 |
Construction of PCC Drain with slab from Jannat Bibi House to Gompa at Jharna Busty1 |
Completion of work |
-
latitude : 26.855925,26.855925,26.855925
Longitude : 89.384424,89.384424,89.384424
file name : Image_11052022134542726.png
|
2022-05-11 13:45:42.826223 |
545 |
47624367 |
Construction of PCC Drain with Slab Cover from St Dominic School to Ashbir Lama House at New Subash |
339845 |
Construction of PCC Drain with Slab Cover from St Dominic School to Ashbir Lama House at New Subash 1 |
Roof laid |
-
latitude : 26.85834796,26.85834796,26.85834793
Longitude : 89.37378077,89.37378077,89.37378078
file name : Image_17112022143946467.png
|
2022-11-17 14:39:46.552564 |
546 |
47624367 |
Construction of PCC Drain with Slab Cover from St Dominic School to Ashbir Lama House at New Subash |
339845 |
Construction of PCC Drain with Slab Cover from St Dominic School to Ashbir Lama House at New Subash 1 |
Plinth level |
-
latitude : 26.85836667,26.85836667,26.85836671
Longitude : 89.37382325,89.37382325,89.37382328
file name : Image_24052022125504823.png
|
2022-05-24 12:55:04.917845 |
547 |
47624367 |
Construction of PCC Drain with Slab Cover from St Dominic School to Ashbir Lama House at New Subash |
339845 |
Construction of PCC Drain with Slab Cover from St Dominic School to Ashbir Lama House at New Subash 1 |
Completion of work |
-
latitude : 26.858292,26.858292,26.858292
Longitude : 89.373949,89.373949,89.373949
file name : Image_10052022174158481.png
|
2022-05-10 17:41:58.612195 |
548 |
47624103 |
Construction of PCC Drain with Slab from Mohan Agarwal House to Jitendra Agarwal House at Sansad XII |
323195 |
Construction of PCC Drain with Slab from Mohan Agarwal House to Jitendra Agarwal House at Sansad XII1 |
Roof laid |
-
latitude : 26.8552594,26.8552594
Longitude : 89.3758435,89.3758435
file name : Image_12122022185002870.png
|
2022-12-12 18:50:02.95372 |
549 |
47624103 |
Construction of PCC Drain with Slab from Mohan Agarwal House to Jitendra Agarwal House at Sansad XII |
323195 |
Construction of PCC Drain with Slab from Mohan Agarwal House to Jitendra Agarwal House at Sansad XII1 |
Plinth level |
-
latitude : 26.85764363,26.85764287,26.8576428
Longitude : 89.37917716,89.37917728,89.37917728
file name : Image_23112022132921623.png
|
2022-11-23 13:29:21.692369 |
550 |
47624103 |
Construction of PCC Drain with Slab from Mohan Agarwal House to Jitendra Agarwal House at Sansad XII |
323195 |
Construction of PCC Drain with Slab from Mohan Agarwal House to Jitendra Agarwal House at Sansad XII1 |
Completion of work |
-
latitude : 26.8578982,26.8578982,26.8578982
Longitude : 89.379459,89.379459,89.379459
file name : Image_11052022143135293.png
|
2022-05-11 14:31:35.379421 |
551 |
47623175 |
Construction of PCC Drain with Iron Cover from Jivan Gurung House to Taaj Bakery at Sansad XI |
339000 |
Construction of PCC Drain with Iron Cover from Jivan Gurung House to Taaj Bakery at Sansad XI1 |
Roof laid |
-
latitude : 26.8581477,26.8581477,26.8581477
Longitude : 89.3786464,89.3786464,89.3786464
file name : Image_02062022162156211.png
|
2022-06-02 16:21:56.295285 |
552 |
47623175 |
Construction of PCC Drain with Iron Cover from Jivan Gurung House to Taaj Bakery at Sansad XI |
339000 |
Construction of PCC Drain with Iron Cover from Jivan Gurung House to Taaj Bakery at Sansad XI1 |
Plinth level |
-
latitude : 26.85825973,26.85825974,26.85825974
Longitude : 89.37867343,89.37867343,89.37867343
file name : Image_17052022145602173.png
|
2022-05-17 14:56:02.26766 |
553 |
47623175 |
Construction of PCC Drain with Iron Cover from Jivan Gurung House to Taaj Bakery at Sansad XI |
339000 |
Construction of PCC Drain with Iron Cover from Jivan Gurung House to Taaj Bakery at Sansad XI1 |
Completion of work |
-
latitude : 26.8581409,26.8581409,26.8581409
Longitude : 89.378609,89.378609,89.378609
file name : Image_06052022160326471.png
|
2022-05-06 16:03:26.547154 |
554 |
47623247 |
Construction of PCC Drain from Kaji House to Pandit House at Sansad XIII |
339845 |
Construction of PCC Drain from Kaji House to Pandit House at Sansad XIII1 |
Roof laid |
-
latitude : 26.85334196,26.85334181,26.85334181
Longitude : 89.37528237,89.37528401,89.37528401
file name : Image_13062022142038901.png
|
2022-06-13 14:20:38.974863 |
555 |
47623247 |
Construction of PCC Drain from Kaji House to Pandit House at Sansad XIII |
339845 |
Construction of PCC Drain from Kaji House to Pandit House at Sansad XIII1 |
Plinth level |
-
latitude : 26.8541336,26.8541336,26.8541336
Longitude : 89.3741056,89.3741056,89.3741056
file name : Image_01062022160111721.png
|
2022-06-01 16:01:11.796361 |
556 |
47623247 |
Construction of PCC Drain from Kaji House to Pandit House at Sansad XIII |
339845 |
Construction of PCC Drain from Kaji House to Pandit House at Sansad XIII1 |
Completion of work |
-
latitude : 26.8582573,26.8582573,26.8582573
Longitude : 89.3749662,89.3749662,89.3749662
file name : Image_11052022161001753.png
|
2022-05-11 16:10:01.838253 |
557 |
47694809 |
Construction of Boundary Wall In Front of SSK at sansad VIII |
1966333 |
Construction of Boundary Wall In Front of SSK at sansad VIII1 |
Plinth level |
-
latitude : 26.85588135
Longitude : 89.37267016
file name : Image_24052022143229448.png
|
2022-05-24 14:32:29.531768 |
558 |
47694809 |
Construction of Boundary Wall In Front of SSK at sansad VIII |
1966333 |
Construction of Boundary Wall In Front of SSK at sansad VIII1 |
Completion of work |
-
latitude : 26.8560758
Longitude : 89.3726288
file name : Image_06052022175901252.png
|
2022-05-06 17:59:01.340928 |
559 |
47694809 |
Construction of Boundary Wall In Front of SSK at sansad VIII |
1966333 |
Construction of Boundary Wall In Front of SSK at sansad VIII1 |
Completion of work |
-
latitude : 26.8560758
Longitude : 89.3726288
file name : Image_06052022180408992.png
|
2022-05-06 18:04:09.059853 |
560 |
47694809 |
Construction of Boundary Wall In Front of SSK at sansad VIII |
1966333 |
Construction of Boundary Wall In Front of SSK at sansad VIII1 |
Completion of work |
-
latitude : 26.8560384
Longitude : 89.3726535
file name : Image_06052022180415669.png
|
2022-05-06 18:04:15.73307 |
561 |
47624033 |
Construction of PCC Drain from Navjyoti Charge to Pritam Pradhan House at Sansad XXI |
298217 |
Construction of PCC Drain from Navjyoti Charge to Pritam Pradhan House at Sansad XXI1 |
Plinth level |
-
latitude : 26.85758808,26.85758806,26.8575881
Longitude : 89.38389616,89.38389611,89.3838961
file name : Image_17112022151333112.png
|
2022-11-17 15:13:33.186852 |
562 |
47624033 |
Construction of PCC Drain from Navjyoti Charge to Pritam Pradhan House at Sansad XXI |
298217 |
Construction of PCC Drain from Navjyoti Charge to Pritam Pradhan House at Sansad XXI1 |
Completion of work |
-
latitude : 26.85603303,26.85603303,26.85603303
Longitude : 89.38229244,89.38229244,89.38229244
file name : Image_11052022170827924.png
|
2022-05-11 17:08:28.109063 |
563 |
47623003 |
Construction of PCC Drain from the house of Mojammel Mia to Aminur Mia at Sansad IX |
298217 |
Construction of PCC Drain from the house of Mojammel Mia to Aminur Mia at Sansad IX1 |
Roof laid |
-
latitude : 26.8540419,26.8540419,26.85404047
Longitude : 89.37300804,89.37300804,89.37300826
file name : Image_13062022144129470.png
|
2022-06-13 14:41:29.559086 |
564 |
47623003 |
Construction of PCC Drain from the house of Mojammel Mia to Aminur Mia at Sansad IX |
298217 |
Construction of PCC Drain from the house of Mojammel Mia to Aminur Mia at Sansad IX1 |
Plinth level |
-
latitude : 26.8526624,26.85394774,26.85395057
Longitude : 89.3744017,89.37304039,89.37304539
file name : Image_17052022143139195.png
|
2022-05-17 14:31:39.277704 |
565 |
47623003 |
Construction of PCC Drain from the house of Mojammel Mia to Aminur Mia at Sansad IX |
298217 |
Construction of PCC Drain from the house of Mojammel Mia to Aminur Mia at Sansad IX1 |
Completion of work |
-
latitude : 26.8555863,26.8555863,26.8555863
Longitude : 89.3729346,89.3729346,89.3729346
file name : Image_06052022181848773.png
|
2022-05-06 18:18:48.860617 |
566 |
47623779 |
Construction of PCC Drain with Iron Cover from Setu Lama House to Gita Giri at Sansad XIX |
331519 |
Construction of PCC Drain with Iron Cover from Setu Lama House to Gita Giri at Sansad XIX1 |
Roof laid |
-
latitude : 26.8587398,26.8587398
Longitude : 89.3820076,89.3820076
file name : Image_23112022170427903.png
|
2022-11-23 17:04:27.977897 |
567 |
47623779 |
Construction of PCC Drain with Iron Cover from Setu Lama House to Gita Giri at Sansad XIX |
331519 |
Construction of PCC Drain with Iron Cover from Setu Lama House to Gita Giri at Sansad XIX1 |
Plinth level |
-
latitude : 26.85897017,26.8589694,26.85896788
Longitude : 89.38190729,89.38190659,89.38190594
file name : Image_17112022150122473.png
|
2022-11-17 15:01:22.550245 |
568 |
47623779 |
Construction of PCC Drain with Iron Cover from Setu Lama House to Gita Giri at Sansad XIX |
331519 |
Construction of PCC Drain with Iron Cover from Setu Lama House to Gita Giri at Sansad XIX1 |
Completion of work |
-
latitude : 26.8587421,26.8587421,26.8587421
Longitude : 89.3819807,89.3819807,89.3819807
file name : Image_11052022142118963.png
|
2022-05-11 14:21:19.053328 |
569 |
47623085 |
Construction of PCC Drain from Choleman Mia house to Chopouddin Kaji Mia at Sansad X |
298217 |
Construction of PCC Drain from Choleman Mia house to Chopouddin Kaji Mia at Sansad X1 |
Roof laid |
-
latitude : 26.85521533,26.85521533,26.85521597
Longitude : 89.37500382,89.37500382,89.37500433
file name : Image_06062022143247485.png
|
2022-06-06 14:32:47.557339 |
570 |
47623085 |
Construction of PCC Drain from Choleman Mia house to Chopouddin Kaji Mia at Sansad X |
298217 |
Construction of PCC Drain from Choleman Mia house to Chopouddin Kaji Mia at Sansad X1 |
Completion of work |
-
latitude : 26.8551463,26.8551463,26.8551463
Longitude : 89.3746528,89.3746528,89.3746528
file name : Image_10052022172821640.png
|
2022-05-10 17:28:21.758606 |
571 |
47622541 |
Installation of Rigbore near the house of Kurban Ansari at Sansad III |
443160 |
Installation of Rigbore near the house of Kurban Ansari at Sansad III1 |
Plinth level |
-
latitude : 26.8551974
Longitude : 89.3757998
file name : Image_05022023163954797.png
|
2023-02-05 16:39:54.914322 |
572 |
47622541 |
Installation of Rigbore near the house of Kurban Ansari at Sansad III |
443160 |
Installation of Rigbore near the house of Kurban Ansari at Sansad III1 |
Completion of work |
-
latitude : 26.85768562
Longitude : 89.37379415
file name : Image_02022023193206488.png
|
2023-02-02 19:32:06.586926 |
573 |
47696129 |
Contruction of PCC Road from Amarnath house to Ganesh Prasad House at Sansad XIII |
202084 |
Contruction of PCC Road from Amarnath house to Ganesh Prasad House at Sansad XIII1 |
Completion of work |
-
latitude : 26.8565466,26.8565466,26.8565466
Longitude : 89.3784611,89.3784611,89.3784611
file name : Image_17052023164610841.png
|
2023-05-17 16:46:10.925677 |
574 |
47694041 |
Construction of PCC Road Near Chandra Kala to lalu Rauth House at sansad IV |
202084 |
Construction of PCC Road Near Chandra Kala to lalu Rauth House at sansad IV1 |
Completion of work |
-
latitude : 26.8588187,26.8588187,26.8588187,26.8588187
Longitude : 89.3739644,89.3739644,89.3739644,89.3739644
file name : Image_16052023154900238.png
|
2023-05-16 15:49:00.322549 |
575 |
72179524 |
Construction of Retaining Walls |
299276 |
Construction of Retaining Walls1 |
Completion of work |
-
latitude : 26.8560025
Longitude : 89.3727165
file name : Image_31102024131535921.png
|
2024-10-31 13:15:36.01157 |
576 |
70801555 |
Drainage Construction |
308342 |
Drainage Construction1 |
Roof laid |
-
latitude : 26.8598151
Longitude : 89.3742036
file name : Image_24012024180954702.png
|
2024-01-24 18:09:54.859088 |
577 |
70801555 |
Drainage Construction |
308342 |
Drainage Construction1 |
Plinth level |
-
latitude : 26.8597922
Longitude : 89.3741918
file name : Image_24012024180322607.png
|
2024-01-24 18:03:22.72425 |
578 |
70801555 |
Drainage Construction |
308342 |
Drainage Construction1 |
Completion of work |
-
latitude : 26.8598183
Longitude : 89.3738636
file name : Image_15122023163540509.png
|
2023-12-15 16:35:40.621712 |