1 |
34839918 |
CC road from Mahajan Ali shop to Afaz Ali house |
349214 |
CC road from Mahajan Ali shop to Afaz Ali house 1 |
Roof laid |
-
latitude : 26.723285363987088,26.72272654250264
Longitude : 89.26706727594137,89.26813496276736
file name : Image_28012021160100778.png
|
2021-01-28 16:01:00.879881 |
2 |
34839918 |
CC road from Mahajan Ali shop to Afaz Ali house |
349214 |
CC road from Mahajan Ali shop to Afaz Ali house 1 |
Plinth level |
-
latitude : 26.723262104205787,26.72267323359847
Longitude : 89.26712754182518,89.26817703992128
file name : Image_28012021153540723.png
|
2021-01-28 15:35:40.82678 |
3 |
34839918 |
CC road from Mahajan Ali shop to Afaz Ali house |
349214 |
CC road from Mahajan Ali shop to Afaz Ali house 1 |
Completion of work |
-
latitude : 26.723317760042846,26.72285088803619
Longitude : 89.26706660538912,89.26782994531095
file name : Image_08012021115358499.png
|
2021-01-08 11:53:58.629026 |
4 |
34836593 |
CC road from Abinash Sarkar house to Sasti Sutradhar |
173290 |
CC road from Abinash Sarkar house to Sasti Sutradhar 1 |
Roof laid |
-
latitude : 26.69139100704342,26.6920808
Longitude : 89.27185661159456,89.2711172
file name : Image_25012021111049558.png
|
2021-01-25 11:10:49.646678 |
5 |
34836593 |
CC road from Abinash Sarkar house to Sasti Sutradhar |
173290 |
CC road from Abinash Sarkar house to Sasti Sutradhar 1 |
Plinth level |
-
latitude : 26.691258656792343,26.69199735391885
Longitude : 89.27207169122994,89.27165527828038
file name : Image_08012021115349494.png
|
2021-01-08 11:53:49.61458 |
6 |
34836593 |
CC road from Abinash Sarkar house to Sasti Sutradhar |
173290 |
CC road from Abinash Sarkar house to Sasti Sutradhar 1 |
Completion of work |
-
latitude : 26.691474155522883,26.691450267098844
Longitude : 89.27186507731676,89.27184328436852
file name : Image_28122020135640821.png
|
2020-12-28 13:56:40.965347 |
7 |
34836593 |
CC road from Abinash Sarkar house to Sasti Sutradhar |
173290 |
CC road from Abinash Sarkar house to Sasti Sutradhar 1 |
Completion of work |
-
latitude : 26.6920811,26.691441633738577
Longitude : 89.2711127,89.27183356136084
file name : Image_28122020133720316.png
|
2020-12-28 13:37:20.41888 |
8 |
34822935 |
Shed in front of Uttar Chhekamari PHC |
260625 |
Shed in front of Uttar Chhekamari PHC1 |
Plinth level |
-
latitude : 26.705632992088795
Longitude : 89.25242937169969
file name : Image_10022021121746450.png
|
2021-02-10 12:17:46.536748 |
9 |
34822935 |
Shed in front of Uttar Chhekamari PHC |
260625 |
Shed in front of Uttar Chhekamari PHC1 |
Completion of work |
-
latitude : 26.70575758907944
Longitude : 89.25246097147465
file name : Image_08012021145206501.png
|
2021-01-08 14:52:06.622791 |
10 |
34718570 |
Hand pump tubewell with water recharge pit near ICDS centre no ninety two at MNS Nagar |
30744 |
Hand pump tubewell with water recharge pit near ICDS centre no ninety two at MNS Nagar 1 |
Roof laid |
-
latitude : 26.7116221
Longitude : 89.2796813
file name : Image_02072021161411823.png
|
2021-07-02 16:14:11.927905 |
11 |
34718570 |
Hand pump tubewell with water recharge pit near ICDS centre no ninety two at MNS Nagar |
30744 |
Hand pump tubewell with water recharge pit near ICDS centre no ninety two at MNS Nagar 1 |
Plinth level |
-
latitude : 26.7116435
Longitude : 89.2796417
file name : Image_02072021160959725.png
|
2021-07-02 16:09:59.860288 |
12 |
34718570 |
Hand pump tubewell with water recharge pit near ICDS centre no ninety two at MNS Nagar |
30744 |
Hand pump tubewell with water recharge pit near ICDS centre no ninety two at MNS Nagar 1 |
Completion of work |
-
latitude : 26.707766144536436
Longitude : 89.28092583082616
file name : Image_02072021160441708.png
|
2021-07-02 16:04:41.827636 |
13 |
39111787 |
Sinking of Hand Pump tubewell with recharge pit near Jatan Oraon house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Jatan Oraon house at Uttar Chhekamari1 |
Roof laid |
-
latitude : 26.70046525541693
Longitude : 89.25824163481593
file name : Image_22062021160806451.png
|
2021-06-22 16:08:06.529275 |
14 |
39111787 |
Sinking of Hand Pump tubewell with recharge pit near Jatan Oraon house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Jatan Oraon house at Uttar Chhekamari1 |
Plinth level |
-
latitude : 26.700461944565177
Longitude : 89.25824607722461
file name : Image_22062021160554645.png
|
2021-06-22 16:05:54.718169 |
15 |
39111787 |
Sinking of Hand Pump tubewell with recharge pit near Jatan Oraon house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Jatan Oraon house at Uttar Chhekamari1 |
Completion of work |
-
latitude : 26.70047091320157
Longitude : 89.25825110636652
file name : Image_22062021160126475.png
|
2021-06-22 16:01:26.563867 |
16 |
39111787 |
Sinking of Hand Pump tubewell with recharge pit near Jatan Oraon house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Jatan Oraon house at Uttar Chhekamari1 |
Completion of work |
-
latitude : 26.700518606230617
Longitude : 89.2582412995398
file name : Image_05062021134910843.png
|
2021-06-05 13:49:10.946692 |
17 |
39111840 |
Sinking of Hand Pump tubewell with recharge pit near Maya Sarki house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Maya Sarki house at Uttar Chhekamari1 |
Roof laid |
-
latitude : 26.700077215209603
Longitude : 89.26232043653727
file name : Image_25062021141020430.png
|
2021-06-25 14:10:20.520144 |
18 |
39111840 |
Sinking of Hand Pump tubewell with recharge pit near Maya Sarki house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Maya Sarki house at Uttar Chhekamari1 |
Plinth level |
-
latitude : 26.700091548264027
Longitude : 89.26232647150755
file name : Image_25062021140810106.png
|
2021-06-25 14:08:10.213474 |
19 |
39111840 |
Sinking of Hand Pump tubewell with recharge pit near Maya Sarki house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Maya Sarki house at Uttar Chhekamari1 |
Completion of work |
-
latitude : 26.700058858841658
Longitude : 89.26244784146547
file name : Image_25062021140526140.png
|
2021-06-25 14:05:26.235277 |
20 |
34836827 |
CC road from Prem Toppno house to Juli Naik house |
167407 |
CC road from Prem Toppno house to Juli Naik house 1 |
Completion of work |
-
latitude : 26.696714144200087,26.69620712287724
Longitude : 89.26994075998664,89.26961143501103
file name : Image_28072021144200275.png
|
2021-07-28 14:42:00.377775 |
21 |
34836827 |
CC road from Prem Toppno house to Juli Naik house |
167407 |
CC road from Prem Toppno house to Juli Naik house 1 |
Completion of work |
-
latitude : 26.703951791860163,26.696175606921315,26.69673463795334
Longitude : 89.27161294966936,89.26957690156996,89.26985400728881
file name : Image_22062021130902777.png
|
2021-06-22 13:09:02.856801 |
22 |
75266135 |
REPAIRING OF RABINDRA BHANU BHAKTA PARK PAINTING AND REPAIRING OF BOUNDARY WALL AT SUBHASH NAGAR |
350000 |
REPAIRING OF RABINDRA BHANU BHAKTA PARK PAINTING AND REPAIRING OF BOUNDARY WALL AT SUBHASH NAGAR1 |
Roof laid |
-
latitude : 26.6958772
Longitude : 89.2820886
file name : Image_04102024160324899.png
|
2024-10-04 16:03:24.987395 |
23 |
75266135 |
REPAIRING OF RABINDRA BHANU BHAKTA PARK PAINTING AND REPAIRING OF BOUNDARY WALL AT SUBHASH NAGAR |
350000 |
REPAIRING OF RABINDRA BHANU BHAKTA PARK PAINTING AND REPAIRING OF BOUNDARY WALL AT SUBHASH NAGAR1 |
Roof laid |
-
latitude : 26.6959474
Longitude : 89.2821176
file name : Image_04102024160320736.png
|
2024-10-04 16:03:20.820316 |
24 |
75266135 |
REPAIRING OF RABINDRA BHANU BHAKTA PARK PAINTING AND REPAIRING OF BOUNDARY WALL AT SUBHASH NAGAR |
350000 |
REPAIRING OF RABINDRA BHANU BHAKTA PARK PAINTING AND REPAIRING OF BOUNDARY WALL AT SUBHASH NAGAR1 |
Plinth level |
-
latitude : 26.69600122142583
Longitude : 89.28242174908519
file name : Image_02092024102921197.png
|
2024-09-02 10:29:21.667249 |
25 |
75266135 |
REPAIRING OF RABINDRA BHANU BHAKTA PARK PAINTING AND REPAIRING OF BOUNDARY WALL AT SUBHASH NAGAR |
350000 |
REPAIRING OF RABINDRA BHANU BHAKTA PARK PAINTING AND REPAIRING OF BOUNDARY WALL AT SUBHASH NAGAR1 |
Completion of work |
-
latitude : 26.6959548
Longitude : 89.2821378
file name : Image_30082024170617203.png
|
2024-08-30 17:06:17.357612 |
26 |
34840535 |
CC road from Mangra Oaon house to Chandra Oraon house |
109192 |
CC road from Mangra Oaon house to Chandra Oraon house 1 |
Roof laid |
-
latitude : 26.718673054128885,26.718464219011366
Longitude : 89.28082658909261,89.2808202188462
file name : Image_25012021111045070.png
|
2021-01-25 11:10:45.164864 |
27 |
34840535 |
CC road from Mangra Oaon house to Chandra Oraon house |
109192 |
CC road from Mangra Oaon house to Chandra Oraon house 1 |
Roof laid |
-
latitude : 26.718709054403007,26.718346998095512
Longitude : 89.280906887725,89.28083706647158
file name : Image_15012021143954322.png
|
2021-01-15 14:39:54.40796 |
28 |
34840535 |
CC road from Mangra Oaon house to Chandra Oraon house |
109192 |
CC road from Mangra Oaon house to Chandra Oraon house 1 |
Plinth level |
-
latitude : 26.71831212937832,26.71835793647915
Longitude : 89.2809309437871,89.2807805724442
file name : Image_08012021115353830.png
|
2021-01-08 11:53:53.94357 |
29 |
34840535 |
CC road from Mangra Oaon house to Chandra Oraon house |
109192 |
CC road from Mangra Oaon house to Chandra Oraon house 1 |
Completion of work |
-
latitude : 26.718578254804015,26.7185245687142
Longitude : 89.2808321211487,89.28078199736774
file name : Image_04012021162724666.png
|
2021-01-04 16:27:24.76216 |
30 |
34840535 |
CC road from Mangra Oaon house to Chandra Oraon house |
109192 |
CC road from Mangra Oaon house to Chandra Oraon house 1 |
Completion of work |
-
latitude : 26.707830894738436,26.7183070583269
Longitude : 89.28061033599079,89.28082214668393
file name : Image_04012021154722618.png
|
2021-01-04 15:47:22.731678 |
31 |
56909378 |
CC drain from Babun Roy house to Krishna Tamali house at Bangabari |
303976 |
CC drain from Babun Roy house to Krishna Tamali house at Bangabari1 |
Roof laid |
-
latitude : 26.721591758541763,26.721606636419892
Longitude : 89.23941001296043,89.23978560604155
file name : Image_24032023141005212.png
|
2023-03-24 14:10:05.295819 |
32 |
56909378 |
CC drain from Babun Roy house to Krishna Tamali house at Bangabari |
303976 |
CC drain from Babun Roy house to Krishna Tamali house at Bangabari1 |
Plinth level |
-
latitude : 26.721622687764466,26.7216053372249
Longitude : 89.23947958275676,89.23972190357745
file name : Image_24032023140322101.png
|
2023-03-24 14:03:22.196857 |
33 |
56909378 |
CC drain from Babun Roy house to Krishna Tamali house at Bangabari |
303976 |
CC drain from Babun Roy house to Krishna Tamali house at Bangabari1 |
Completion of work |
-
latitude : 26.721618371084332,26.721598925068974
Longitude : 89.23937254585326,89.23955636098981
file name : Image_21032023165426375.png
|
2023-03-21 16:54:26.461143 |
34 |
56772342 |
CC drain with slab from Sister Quarter of Madarihat BPHC to high drain |
348361 |
CC drain with slab from Sister Quarter of Madarihat BPHC to high drain1 |
Roof laid |
-
latitude : 26.692841495387256,26.6916004
Longitude : 89.27480846643448,89.2751182
file name : Image_27032023180850375.png
|
2023-03-27 18:08:50.587598 |
35 |
56772342 |
CC drain with slab from Sister Quarter of Madarihat BPHC to high drain |
348361 |
CC drain with slab from Sister Quarter of Madarihat BPHC to high drain1 |
Plinth level |
-
latitude : 26.6917361,26.6917034
Longitude : 89.2751852,89.2749392
file name : Image_27032023180356751.png
|
2023-03-27 18:03:56.847846 |
36 |
56772342 |
CC drain with slab from Sister Quarter of Madarihat BPHC to high drain |
348361 |
CC drain with slab from Sister Quarter of Madarihat BPHC to high drain1 |
Completion of work |
-
latitude : 26.6944195,26.6919182
Longitude : 89.2746184,89.2749032
file name : Image_20032023093925178.png
|
2023-03-20 09:39:25.268457 |
37 |
56583048 |
Overhead tank running with solar system near Perana Sangha club at Uttar Khairbari |
348617 |
Overhead tank running with solar system near Perana Sangha club at Uttar Khairbari1 |
Roof laid |
-
latitude : 26.7332314979285
Longitude : 89.2664528824389
file name : Image_11052023155449911.png
|
2023-05-11 15:54:50.012671 |
38 |
56583048 |
Overhead tank running with solar system near Perana Sangha club at Uttar Khairbari |
348617 |
Overhead tank running with solar system near Perana Sangha club at Uttar Khairbari1 |
Plinth level |
-
latitude : 26.733188373036683
Longitude : 89.26635833457112
file name : Image_11042023165408016.png
|
2023-04-11 16:54:08.112708 |
39 |
56583048 |
Overhead tank running with solar system near Perana Sangha club at Uttar Khairbari |
348617 |
Overhead tank running with solar system near Perana Sangha club at Uttar Khairbari1 |
Completion of work |
-
latitude : 26.733202496543527
Longitude : 89.26639689132571
file name : Image_11042023164334110.png
|
2023-04-11 16:43:34.207226 |
40 |
56793230 |
CC drain with slab from Abhijit Roy house to Ramprasad Saha house at Rabindra Nagar |
241889 |
CC drain with slab from Abhijit Roy house to Ramprasad Saha house at Rabindra Nagar1 |
Roof laid |
-
latitude : 26.6966993,26.696713
Longitude : 89.2793959,89.2793802
file name : Image_23032023160046988.png
|
2023-03-23 16:00:47.112953 |
41 |
56793230 |
CC drain with slab from Abhijit Roy house to Ramprasad Saha house at Rabindra Nagar |
241889 |
CC drain with slab from Abhijit Roy house to Ramprasad Saha house at Rabindra Nagar1 |
Plinth level |
-
latitude : 26.6965887,26.6966232
Longitude : 89.2794974,89.2794882
file name : Image_23032023155708760.png
|
2023-03-23 15:57:08.848027 |
42 |
56793230 |
CC drain with slab from Abhijit Roy house to Ramprasad Saha house at Rabindra Nagar |
241889 |
CC drain with slab from Abhijit Roy house to Ramprasad Saha house at Rabindra Nagar1 |
Completion of work |
-
latitude : 26.6966659,26.6966098
Longitude : 89.2794647,89.2794721
file name : Image_11032023104210137.png
|
2023-03-11 10:42:10.243512 |
43 |
56909552 |
CC drain from Mangal Oraon house to Jailu Oraon house at Mujnai TG |
349170 |
CC drain from Mangal Oraon house to Jailu Oraon house at Mujnai TG1 |
Roof laid |
-
latitude : 26.712206080555916,26.71227472834289
Longitude : 89.239945365116,89.23944806680083
file name : Image_28032023155737687.png
|
2023-03-28 15:57:37.788106 |
44 |
56909552 |
CC drain from Mangal Oraon house to Jailu Oraon house at Mujnai TG |
349170 |
CC drain from Mangal Oraon house to Jailu Oraon house at Mujnai TG1 |
Plinth level |
-
latitude : 26.7122406559065,26.712241410277784
Longitude : 89.23970991745591,89.23956625163555
file name : Image_28032023154700571.png
|
2023-03-28 15:47:00.670955 |
45 |
56909552 |
CC drain from Mangal Oraon house to Jailu Oraon house at Mujnai TG |
349170 |
CC drain from Mangal Oraon house to Jailu Oraon house at Mujnai TG1 |
Completion of work |
-
latitude : 26.712230346165597,26.712231477722526
Longitude : 89.23981066793203,89.23965560272336
file name : Image_28032023154126637.png
|
2023-03-28 15:41:26.749521 |
46 |
56772828 |
CC drain from Soyo Oraon house to Some Oraon at Purba Khairbari |
349165 |
CC drain from Soyo Oraon house to Some Oraon at Purba Khairbari1 |
Roof laid |
-
latitude : 26.718019349500537,26.718004010617733
Longitude : 89.28014815784991,89.28035141900182
file name : Image_30032023160422299.png
|
2023-03-30 16:04:22.409433 |
47 |
56772828 |
CC drain from Soyo Oraon house to Some Oraon at Purba Khairbari |
349165 |
CC drain from Soyo Oraon house to Some Oraon at Purba Khairbari1 |
Plinth level |
-
latitude : 26.717997011728585,26.718002753332257
Longitude : 89.28041730076075,89.28045552223921
file name : Image_30032023160005930.png
|
2023-03-30 16:00:06.03083 |
48 |
56772828 |
CC drain from Soyo Oraon house to Some Oraon at Purba Khairbari |
349165 |
CC drain from Soyo Oraon house to Some Oraon at Purba Khairbari1 |
Completion of work |
-
latitude : 26.717959251254797,26.71797157265246
Longitude : 89.28020993247628,89.28026868961751
file name : Image_20032023125139269.png
|
2023-03-20 12:51:39.359148 |
49 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year1 |
Roof laid |
-
latitude : 26.7078317
Longitude : 89.2805518
file name : Image_06012022134147349.png
|
2022-01-06 13:41:47.493837 |
50 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year1 |
Plinth level |
-
latitude : 26.7078272
Longitude : 89.2805556
file name : Image_06012022133657682.png
|
2022-01-06 13:36:57.842352 |
51 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year1 |
Completion of work |
-
latitude : 26.7078269
Longitude : 89.2805557
file name : Image_06012022132927957.png
|
2022-01-06 13:29:28.101564 |
52 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year2 |
Completion of work |
-
latitude : 26.691640787757933
Longitude : 89.27339636720717
file name : Image_07012022104151490.png
|
2022-01-07 10:41:51.614278 |
53 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year2 |
Completion of work |
-
latitude : 26.691571259871125
Longitude : 89.27339703775942
file name : Image_07012022104157063.png
|
2022-01-07 10:41:57.166821 |
54 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year2 |
Completion of work |
-
latitude : 26.691613630391657
Longitude : 89.27337633445859
file name : Image_07012022093531565.png
|
2022-01-07 09:35:31.661715 |
55 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year2 |
Completion of work |
-
latitude : 26.691651600413024
Longitude : 89.27342318929732
file name : Image_07012022093535223.png
|
2022-01-07 09:35:35.318404 |
56 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year2 |
Completion of work |
-
latitude : 26.69146074447781
Longitude : 89.27336426451802
file name : Image_07012022092457280.png
|
2022-01-07 09:24:57.379276 |
57 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year5 |
Completion of work |
-
latitude : 26.6911204
Longitude : 89.2749645
file name : Image_09012022200125676.png
|
2022-01-09 20:01:25.783234 |
58 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year5 |
Completion of work |
-
latitude : 26.6911651
Longitude : 89.2749481
file name : Image_09012022195536726.png
|
2022-01-09 19:55:36.872297 |
59 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year5 |
Completion of work |
-
latitude : 26.6911584
Longitude : 89.2751604
file name : Image_09012022194541207.png
|
2022-01-09 19:45:41.317461 |
60 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year5 |
Completion of work |
-
latitude : 26.6939619
Longitude : 89.280468
file name : Image_08012022124252971.png
|
2022-01-08 12:42:53.085938 |
61 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year5 |
Completion of work |
-
latitude : 26.6940074
Longitude : 89.2804596
file name : Image_08012022123731274.png
|
2022-01-08 12:37:31.37138 |
62 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year5 |
Completion of work |
-
latitude : 26.6940557
Longitude : 89.2805235
file name : Image_08012022123115985.png
|
2022-01-08 12:31:16.096842 |
63 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year3 |
Completion of work |
-
latitude : 26.7053084
Longitude : 89.2807647
file name : Image_07012022162241383.png
|
2022-01-07 16:22:41.474111 |
64 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year3 |
Completion of work |
-
latitude : 26.704890648834407
Longitude : 89.28069155663252
file name : Image_07012022161256561.png
|
2022-01-07 16:12:56.659716 |
65 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year3 |
Completion of work |
-
latitude : 26.7053178
Longitude : 89.2807373
file name : Image_07012022160348825.png
|
2022-01-07 16:03:48.922578 |
66 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year4 |
Completion of work |
-
latitude : 26.6884504
Longitude : 89.2775471
file name : Image_08012022113437260.png
|
2022-01-08 11:34:37.383048 |
67 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year4 |
Completion of work |
-
latitude : 26.6884455
Longitude : 89.2775503
file name : Image_08012022113034215.png
|
2022-01-08 11:30:34.326035 |
68 |
34913709 |
Street light throughout the financial year |
6000000 |
Street light throughout the financial year4 |
Completion of work |
-
latitude : 26.6884455
Longitude : 89.2775503
file name : Image_08012022111347099.png
|
2022-01-08 11:13:47.221037 |
69 |
47100434 |
Construction of high Drain with Slab from Ashim Lahiri House to Achamka Club at Aswini Nagar III San |
285456 |
Construction of high Drain with Slab from Ashim Lahiri House to Achamka Club at Aswini Nagar III San1 |
Plinth level |
-
latitude : 26.6911739,26.691680727526546,26.6914611
Longitude : 89.2784727,89.27846088074148,89.2797344
file name : Image_09052022140108904.png
|
2022-05-09 14:01:09.018865 |
70 |
47100434 |
Construction of high Drain with Slab from Ashim Lahiri House to Achamka Club at Aswini Nagar III San |
285456 |
Construction of high Drain with Slab from Ashim Lahiri House to Achamka Club at Aswini Nagar III San1 |
Completion of work |
-
latitude : 26.691138837486506,26.6885259
Longitude : 89.27835384383798,89.2783627
file name : Image_21032022164410567.png
|
2022-03-21 16:44:10.66818 |
71 |
47100434 |
Construction of high Drain with Slab from Ashim Lahiri House to Achamka Club at Aswini Nagar III San |
285456 |
Construction of high Drain with Slab from Ashim Lahiri House to Achamka Club at Aswini Nagar III San1 |
Completion of work |
-
latitude : 26.6895539,26.6885261,26.6886244
Longitude : 89.2779165,89.2783671,89.2783539
file name : Image_28022022114143832.png
|
2022-02-28 11:41:43.94759 |
72 |
47102060 |
CONSTRUCTION OF CC DRAIN FROM KUL BAHADUR CHHETRITOMISSION HOSPITAL AT PRADHAN NAGAR SANSAD IX |
269222 |
CONSTRUCTION OF CC DRAIN FROM KUL BAHADUR CHHETRITOMISSION HOSPITAL AT PRADHAN NAGAR SANSAD IX1 |
Roof laid |
-
latitude : 26.695319982245564,26.695994515903294
Longitude : 89.26518277265131,89.26512979902327
file name : Image_16062022133312662.png
|
2022-06-16 13:33:12.769308 |
73 |
47102060 |
CONSTRUCTION OF CC DRAIN FROM KUL BAHADUR CHHETRITOMISSION HOSPITAL AT PRADHAN NAGAR SANSAD IX |
269222 |
CONSTRUCTION OF CC DRAIN FROM KUL BAHADUR CHHETRITOMISSION HOSPITAL AT PRADHAN NAGAR SANSAD IX1 |
Roof laid |
-
latitude : 26.695339805446565,26.69537475798279
Longitude : 89.2651388514787,89.26512904465199
file name : Image_15062022140245487.png
|
2022-06-15 14:02:45.565674 |
74 |
47102060 |
CONSTRUCTION OF CC DRAIN FROM KUL BAHADUR CHHETRITOMISSION HOSPITAL AT PRADHAN NAGAR SANSAD IX |
269222 |
CONSTRUCTION OF CC DRAIN FROM KUL BAHADUR CHHETRITOMISSION HOSPITAL AT PRADHAN NAGAR SANSAD IX1 |
Plinth level |
-
latitude : 26.6952611412853,26.695277569815516
Longitude : 89.26523893140256,89.26514807157218
file name : Image_15062022130937478.png
|
2022-06-15 13:09:37.561885 |
75 |
47102060 |
CONSTRUCTION OF CC DRAIN FROM KUL BAHADUR CHHETRITOMISSION HOSPITAL AT PRADHAN NAGAR SANSAD IX |
269222 |
CONSTRUCTION OF CC DRAIN FROM KUL BAHADUR CHHETRITOMISSION HOSPITAL AT PRADHAN NAGAR SANSAD IX1 |
Completion of work |
-
latitude : 26.6914477,26.6914455
Longitude : 89.2738092,89.2738089
file name : Image_29052022163108066.png
|
2022-05-29 16:31:08.18166 |
76 |
57049500 |
Road with pavers block from Ganesh Roy house to Jamal Hussain house at Uttar Khairbari |
183845 |
Road with pavers block from Ganesh Roy house to Jamal Hussain house at Uttar Khairbari1 |
Roof laid |
-
latitude : 26.73281818628311,26.732792537659407
Longitude : 89.2658865172416,89.26596321165562
file name : Image_19072023124250095.png
|
2023-07-19 12:42:50.209881 |
77 |
57049500 |
Road with pavers block from Ganesh Roy house to Jamal Hussain house at Uttar Khairbari |
183845 |
Road with pavers block from Ganesh Roy house to Jamal Hussain house at Uttar Khairbari1 |
Plinth level |
-
latitude : 26.732754525728524,26.732852174900472
Longitude : 89.26596639677882,89.26604652777314
file name : Image_19072023123515046.png
|
2023-07-19 12:35:15.144607 |
78 |
57049500 |
Road with pavers block from Ganesh Roy house to Jamal Hussain house at Uttar Khairbari |
183845 |
Road with pavers block from Ganesh Roy house to Jamal Hussain house at Uttar Khairbari1 |
Completion of work |
-
latitude : 26.7327877599746,26.732944543473423
Longitude : 89.26595466211438,89.26619648002088
file name : Image_03072023164713389.png
|
2023-07-03 16:47:13.485441 |
79 |
56909649 |
CC drain from Football Ground to Monshi Gore house at Mujnai TG |
340439 |
CC drain from Football Ground to Monshi Gore house at Mujnai TG1 |
Roof laid |
-
latitude : 26.715761558152735,26.715626483783126
Longitude : 89.23513566143811,89.23537814989686
file name : Image_31072023122416017.png
|
2023-07-31 12:24:16.158108 |
80 |
56909649 |
CC drain from Football Ground to Monshi Gore house at Mujnai TG |
340439 |
CC drain from Football Ground to Monshi Gore house at Mujnai TG1 |
Plinth level |
-
latitude : 26.715774214826524,26.715694377198815
Longitude : 89.23523071222007,89.23550815321505
file name : Image_31072023095020326.png
|
2023-07-31 09:50:20.4247 |
81 |
56909649 |
CC drain from Football Ground to Monshi Gore house at Mujnai TG |
340439 |
CC drain from Football Ground to Monshi Gore house at Mujnai TG1 |
Completion of work |
-
latitude : 26.715730000287294,26.715687126852572
Longitude : 89.2351964302361,89.23534613102674
file name : Image_29072023132253476.png
|
2023-07-29 13:22:53.597497 |
82 |
56709894 |
Rig bore tubewell near the house of Ranjit Saiba at Uttar Chhekamari at Uttar Chhekamari |
349826 |
Rig bore tubewell near the house of Ranjit Saiba at Uttar Chhekamari at Uttar Chhekamari1 |
Roof laid |
-
latitude : 26.70096343383193
Longitude : 89.2603154014796
file name : Image_08062023171618338.png
|
2023-06-08 17:16:18.437568 |
83 |
56709894 |
Rig bore tubewell near the house of Ranjit Saiba at Uttar Chhekamari at Uttar Chhekamari |
349826 |
Rig bore tubewell near the house of Ranjit Saiba at Uttar Chhekamari at Uttar Chhekamari1 |
Plinth level |
-
latitude : 26.700936653651297
Longitude : 89.26030936650932
file name : Image_08062023170947136.png
|
2023-06-08 17:09:47.244609 |
84 |
56709894 |
Rig bore tubewell near the house of Ranjit Saiba at Uttar Chhekamari at Uttar Chhekamari |
349826 |
Rig bore tubewell near the house of Ranjit Saiba at Uttar Chhekamari at Uttar Chhekamari1 |
Completion of work |
-
latitude : 26.700928271748126
Longitude : 89.26025379449129
file name : Image_08062023170424241.png
|
2023-06-08 17:04:24.344928 |
85 |
56582979 |
Overhead tank running with solar system at jamtola bazar of Uttar Khairbari |
349729 |
Overhead tank running with solar system at jamtola bazar of Uttar Khairbari1 |
Completion of work |
-
latitude : 26.73590876162052
Longitude : 89.27164119668305
file name : Image_04082023151108715.png
|
2023-08-04 15:11:08.83623 |
86 |
56974138 |
Culvert near Sukru Oraon house at Purba Khairbari |
136791 |
Culvert near Sukru Oraon house at Purba Khairbari1 |
Plinth level |
-
latitude : 26.720312470570207,26.72026813030243
Longitude : 89.27835091017187,89.27836641669273
file name : Image_25082023160530835.png
|
2023-08-25 16:05:30.936885 |
87 |
56974138 |
Culvert near Sukru Oraon house at Purba Khairbari |
136791 |
Culvert near Sukru Oraon house at Purba Khairbari1 |
Completion of work |
-
latitude : 26.72033388633281,26.720334053970873
Longitude : 89.27836080081761,89.2785079870373
file name : Image_25082023155700815.png
|
2023-08-25 15:57:00.926307 |
88 |
56793130 |
CC drain with slab from Gopal Das house to four no Play ground boundary at Prdhan Nagar |
251457 |
CC drain with slab from Gopal Das house to four no Play ground boundary at Prdhan Nagar1 |
Roof laid |
-
latitude : 26.7055673,26.705401986837387,26.7055149
Longitude : 89.279943,89.27974867634475,89.2804538
file name : Image_25082023170332022.png
|
2023-08-25 17:03:32.115237 |
89 |
56793130 |
CC drain with slab from Gopal Das house to four no Play ground boundary at Prdhan Nagar |
251457 |
CC drain with slab from Gopal Das house to four no Play ground boundary at Prdhan Nagar1 |
Plinth level |
-
latitude : 26.7055929,26.705486
Longitude : 89.2796496,89.2802748
file name : Image_25082023165729201.png
|
2023-08-25 16:57:29.294337 |
90 |
56793130 |
CC drain with slab from Gopal Das house to four no Play ground boundary at Prdhan Nagar |
251457 |
CC drain with slab from Gopal Das house to four no Play ground boundary at Prdhan Nagar1 |
Completion of work |
-
latitude : 26.7055881,26.7055277
Longitude : 89.2797252,89.280479
file name : Image_25082023165138438.png
|
2023-08-25 16:51:38.545333 |
91 |
56793130 |
CC drain with slab from Gopal Das house to four no Play ground boundary at Prdhan Nagar |
251457 |
CC drain with slab from Gopal Das house to four no Play ground boundary at Prdhan Nagar1 |
Completion of work |
-
latitude : 26.7055765,26.7054435
Longitude : 89.2795494,89.2805827
file name : Image_25082023165131068.png
|
2023-08-25 16:51:31.161082 |
92 |
56793346 |
CC drain with slab from Jabarani Saha house to Pranesh Das house at Subhas Nagar |
348372 |
CC drain with slab from Jabarani Saha house to Pranesh Das house at Subhas Nagar1 |
Roof laid |
-
latitude : 26.6943321749568,26.69431172311306
Longitude : 89.27875843830407,89.27869859151542
file name : Image_18052023092039355.png
|
2023-05-18 09:20:39.459356 |
93 |
56793346 |
CC drain with slab from Jabarani Saha house to Pranesh Das house at Subhas Nagar |
348372 |
CC drain with slab from Jabarani Saha house to Pranesh Das house at Subhas Nagar1 |
Plinth level |
-
latitude : 26.694241231307387,26.694303047843277
Longitude : 89.27859901450574,89.27861728705466
file name : Image_18052023091210577.png
|
2023-05-18 09:12:10.693601 |
94 |
56793346 |
CC drain with slab from Jabarani Saha house to Pranesh Das house at Subhas Nagar |
348372 |
CC drain with slab from Jabarani Saha house to Pranesh Das house at Subhas Nagar1 |
Completion of work |
-
latitude : 26.69437668286264,26.694212523289025
Longitude : 89.27884561009705,89.27860144525766
file name : Image_18052023085531189.png
|
2023-05-18 08:55:31.285771 |
95 |
46896699 |
Construction of CC Road from Dipak Majhi house to Sanjib Naik |
249476 |
Construction of CC Road from Dipak Majhi house to Sanjib Naik1 |
Completion of work |
-
latitude : 26.695876750163734,26.69586585368961
Longitude : 89.27296184934676,89.27287534810603
file name : Image_14092022151429310.png
|
2022-09-14 15:14:29.416081 |
96 |
47208975 |
Installation of Hand Pump with Water recharge Pit near house of Bandhan Oraon bech line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Bandhan Oraon bech line 1 |
Roof laid |
-
latitude : 26.71170563902706
Longitude : 89.24131153151393
file name : Image_18102022092056788.png
|
2022-10-18 09:20:56.88668 |
97 |
47208975 |
Installation of Hand Pump with Water recharge Pit near house of Bandhan Oraon bech line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Bandhan Oraon bech line 1 |
Plinth level |
-
latitude : 26.6914696
Longitude : 89.2734556
file name : Image_14102022125844386.png
|
2022-10-14 12:58:44.498889 |
98 |
47208975 |
Installation of Hand Pump with Water recharge Pit near house of Bandhan Oraon bech line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Bandhan Oraon bech line 1 |
Completion of work |
-
latitude : 26.711790757253766
Longitude : 89.2411539517343
file name : Image_28092022155525296.png
|
2022-09-28 15:55:25.400754 |
99 |
57051657 |
Road with Pavers block from Mobarak Miya house to Masjid at Uttar Chhekamari |
300000 |
Road with Pavers block from Mobarak Miya house to Masjid at Uttar Chhekamari1 |
Roof laid |
-
latitude : 26.704187029972672,26.704694679938257
Longitude : 89.25150895491242,89.2507897876203
file name : Image_27032023154927439.png
|
2023-03-27 15:49:27.533107 |
100 |
57051657 |
Road with Pavers block from Mobarak Miya house to Masjid at Uttar Chhekamari |
300000 |
Road with Pavers block from Mobarak Miya house to Masjid at Uttar Chhekamari1 |
Plinth level |
-
latitude : 26.704708342440426,26.704166494309902
Longitude : 89.25074578262866,89.25147442147136
file name : Image_27032023153227003.png
|
2023-03-27 15:32:27.112437 |
101 |
57051657 |
Road with Pavers block from Mobarak Miya house to Masjid at Uttar Chhekamari |
300000 |
Road with Pavers block from Mobarak Miya house to Masjid at Uttar Chhekamari1 |
Completion of work |
-
latitude : 26.704652099870145,26.70450797304511
Longitude : 89.25070613622665,89.25097402185202
file name : Image_21032023164010179.png
|
2023-03-21 16:40:10.281527 |
102 |
56772175 |
CC drain with slab from Rajkumar Roy to Nilima Das house at Aswini Nagar one |
347092 |
CC drain with slab from Rajkumar Roy to Nilima Das house at Aswini Nagar one1 |
Roof laid |
-
latitude : 26.69305230025202,26.6927574
Longitude : 89.26963767036796,89.2690322
file name : Image_27032023175451824.png
|
2023-03-27 17:54:51.918815 |
103 |
56772175 |
CC drain with slab from Rajkumar Roy to Nilima Das house at Aswini Nagar one |
347092 |
CC drain with slab from Rajkumar Roy to Nilima Das house at Aswini Nagar one1 |
Plinth level |
-
latitude : 26.6930559463799,26.6927548
Longitude : 89.26956868730485,89.2690345
file name : Image_27032023175000958.png
|
2023-03-27 17:50:01.061075 |
104 |
56772175 |
CC drain with slab from Rajkumar Roy to Nilima Das house at Aswini Nagar one |
347092 |
CC drain with slab from Rajkumar Roy to Nilima Das house at Aswini Nagar one1 |
Completion of work |
-
latitude : 26.6907218,26.6927546
Longitude : 89.2761565,89.2690336
file name : Image_20032023092707585.png
|
2023-03-20 09:27:07.699304 |
105 |
57050284 |
Road with Pavers block from Satyen Sarkar house to Prabir Sarkar house at MNS Nagar |
347949 |
Road with Pavers block from Satyen Sarkar house to Prabir Sarkar house at MNS Nagar1 |
Roof laid |
-
latitude : 26.7053535,26.7053532
Longitude : 89.2827039,89.2827058
file name : Image_13042023165108292.png
|
2023-04-13 16:51:08.390762 |
106 |
57050284 |
Road with Pavers block from Satyen Sarkar house to Prabir Sarkar house at MNS Nagar |
347949 |
Road with Pavers block from Satyen Sarkar house to Prabir Sarkar house at MNS Nagar1 |
Plinth level |
-
latitude : 26.7053097859025,26.70525505207479
Longitude : 89.2819254565984,89.28218412213027
file name : Image_30032023161158022.png
|
2023-03-30 16:11:58.118472 |
107 |
57050284 |
Road with Pavers block from Satyen Sarkar house to Prabir Sarkar house at MNS Nagar |
347949 |
Road with Pavers block from Satyen Sarkar house to Prabir Sarkar house at MNS Nagar1 |
Completion of work |
-
latitude : 26.705286777578294,26.705312342382967
Longitude : 89.2817874904722,89.2819465789944
file name : Image_20032023125845519.png
|
2023-03-20 12:58:45.616326 |
108 |
34309584 |
Construction of cc drain from Hiran Das house to Railway line at MNS nagar |
160457 |
Construction of cc drain from Hiran Das house to Railway line at MNS nagar1 |
Plinth level |
-
latitude : 26.713276994414628,26.713435035198927
Longitude : 89.27959470078349,89.27998596802354
file name : Image_17032021144924886.png
|
2021-03-17 14:49:25.019581 |
109 |
34309584 |
Construction of cc drain from Hiran Das house to Railway line at MNS nagar |
160457 |
Construction of cc drain from Hiran Das house to Railway line at MNS nagar1 |
Roof laid |
-
latitude : 26.713454858399928,26.71329861972481
Longitude : 89.27996216341853,89.27970157004893
file name : Image_17032021145353527.png
|
2021-03-17 14:53:53.633012 |
110 |
34309584 |
Construction of cc drain from Hiran Das house to Railway line at MNS nagar |
160457 |
Construction of cc drain from Hiran Das house to Railway line at MNS nagar1 |
Completion of work |
-
latitude : 26.713473382405937,26.713259224779904
Longitude : 89.27994573488832,89.27965320646763
file name : Image_04022021140020185.png
|
2021-02-04 14:00:20.310012 |
111 |
39109256 |
Construction of CC drain from Soyo Oraon house to Some Oraon at Purba Khairbari house |
342390 |
Construction of CC drain from Soyo Oraon house to Some Oraon at Purba Khairbari house1 |
Roof laid |
-
latitude : 26.717887124978006,26.717974632047117
Longitude : 89.27950174547732,89.28014949895442
file name : Image_17032021144617708.png
|
2021-03-17 14:46:17.811525 |
112 |
39109256 |
Construction of CC drain from Soyo Oraon house to Some Oraon at Purba Khairbari house |
342390 |
Construction of CC drain from Soyo Oraon house to Some Oraon at Purba Khairbari house1 |
Roof laid |
-
latitude : 26.717867720872164,26.7178598837927
Longitude : 89.27939328365028,89.28010582923889
file name : Image_12032021161240564.png
|
2021-03-12 16:12:40.651629 |
113 |
39109256 |
Construction of CC drain from Soyo Oraon house to Some Oraon at Purba Khairbari house |
342390 |
Construction of CC drain from Soyo Oraon house to Some Oraon at Purba Khairbari house1 |
Completion of work |
-
latitude : 26.7137746,26.717823003418744
Longitude : 89.2836863,89.27943745628
file name : Image_28012021121626300.png
|
2021-01-28 12:16:26.41076 |
114 |
39112112 |
Drain with slab from Jalmohan Mandal house to Abinash Barman house at Uttar Khairbari |
206314 |
Drain with slab from Jalmohan Mandal house to Abinash Barman house at Uttar Khairbari1 |
Completion of work |
-
latitude : 26.73346216790378,26.733388155698776
Longitude : 89.26627996377647,89.26629614084959
file name : Image_17032021134455063.png
|
2021-03-17 13:44:55.194135 |
115 |
39112112 |
Drain with slab from Jalmohan Mandal house to Abinash Barman house at Uttar Khairbari |
206314 |
Drain with slab from Jalmohan Mandal house to Abinash Barman house at Uttar Khairbari1 |
Roof laid |
-
latitude : 26.73321175854653,26.73343132250011
Longitude : 89.26693408749998,89.26632941700518
file name : Image_17032021144558123.png
|
2021-03-17 14:45:58.232122 |
116 |
39112112 |
Drain with slab from Jalmohan Mandal house to Abinash Barman house at Uttar Khairbari |
206314 |
Drain with slab from Jalmohan Mandal house to Abinash Barman house at Uttar Khairbari1 |
Completion of work |
-
latitude : 26.73340693116188,26.73335249070078
Longitude : 89.26627862267196,89.26683157682419
file name : Image_28012021152329352.png
|
2021-01-28 15:23:29.438921 |
117 |
56772462 |
CC drain with slab from Gautam Roy house to Malay Das house |
301200 |
CC drain with slab from Gautam Roy house to Malay Das house 1 |
Roof laid |
-
latitude : 26.6932536,26.6933376
Longitude : 89.2790835,89.2791077
file name : Image_17042023171011156.png
|
2023-04-17 17:10:11.2636 |
118 |
56772462 |
CC drain with slab from Gautam Roy house to Malay Das house |
301200 |
CC drain with slab from Gautam Roy house to Malay Das house 1 |
Plinth level |
-
latitude : 26.6933134,26.6934506
Longitude : 89.2791387,89.2789427
file name : Image_17042023170323801.png
|
2023-04-17 17:03:23.918386 |
119 |
56772462 |
CC drain with slab from Gautam Roy house to Malay Das house |
301200 |
CC drain with slab from Gautam Roy house to Malay Das house 1 |
Completion of work |
-
latitude : 26.6932945,26.6932877
Longitude : 89.2791448,89.2791466
file name : Image_13042023160756466.png
|
2023-04-13 16:07:56.558089 |
120 |
56582795 |
Drinking water arrangement with solar system near Bahadizud Mosjid at M Khairbari |
348617 |
Drinking water arrangement with solar system near Bahadizud Mosjid at M Khairbari1 |
Plinth level |
-
latitude : 26.723940912634134
Longitude : 89.27227939479053
file name : Image_11042023170901879.png
|
2023-04-11 17:09:02.01705 |
121 |
56582795 |
Drinking water arrangement with solar system near Bahadizud Mosjid at M Khairbari |
348617 |
Drinking water arrangement with solar system near Bahadizud Mosjid at M Khairbari1 |
Roof laid |
-
latitude : 26.72394166700542
Longitude : 89.2722962424159
file name : Image_11052023160916495.png
|
2023-05-11 16:09:16.606568 |
122 |
56582795 |
Drinking water arrangement with solar system near Bahadizud Mosjid at M Khairbari |
348617 |
Drinking water arrangement with solar system near Bahadizud Mosjid at M Khairbari1 |
Completion of work |
-
latitude : 26.723902984522283
Longitude : 89.27230412140489
file name : Image_11042023170358410.png
|
2023-04-11 17:03:58.507003 |
123 |
39112181 |
Drain with slab from Dipak Jha house to Jhari Oraon house at Bangabari |
269911 |
Drain with slab from Dipak Jha house to Jhari Oraon house at Bangabari1 |
Roof laid |
-
latitude : 26.721049239858985,26.721556093543768
Longitude : 89.23983246088028,89.23924840986729
file name : Image_26032021131457516.png
|
2021-03-26 13:14:57.614709 |
124 |
39112181 |
Drain with slab from Dipak Jha house to Jhari Oraon house at Bangabari |
269911 |
Drain with slab from Dipak Jha house to Jhari Oraon house at Bangabari1 |
Plinth level |
-
latitude : 26.721554207615554,26.72106738667935
Longitude : 89.23925939016044,89.23981980420649
file name : Image_17032021140219403.png
|
2021-03-17 14:02:19.487356 |
125 |
39112181 |
Drain with slab from Dipak Jha house to Jhari Oraon house at Bangabari |
269911 |
Drain with slab from Dipak Jha house to Jhari Oraon house at Bangabari1 |
Completion of work |
-
latitude : 26.721526044420898,26.721047731116414
Longitude : 89.2392701189965,89.23984293825924
file name : Image_10022021112532131.png
|
2021-02-10 11:25:32.219564 |
126 |
39112181 |
Drain with slab from Dipak Jha house to Jhari Oraon house at Bangabari |
269911 |
Drain with slab from Dipak Jha house to Jhari Oraon house at Bangabari1 |
Completion of work |
-
latitude : 26.721533630043268,26.721006953157485
Longitude : 89.23927112482488,89.23993178643286
file name : Image_28012021152333570.png
|
2021-01-28 15:23:33.659582 |
127 |
39111465 |
Drain with slab from Kusum Chowdhury house to Mina Sharma house at Purba khairbari |
202301 |
Drain with slab from Kusum Chowdhury house to Mina Sharma house at Purba khairbari1 |
Roof laid |
-
latitude : 26.722876662388444,26.722539919428527
Longitude : 89.29200075566769,89.29138217121363
file name : Image_23042021161454843.png
|
2021-04-23 16:14:54.927128 |
128 |
39111465 |
Drain with slab from Kusum Chowdhury house to Mina Sharma house at Purba khairbari |
202301 |
Drain with slab from Kusum Chowdhury house to Mina Sharma house at Purba khairbari1 |
Plinth level |
-
latitude : 26.722859521396458,26.72254888806492
Longitude : 89.29197242483497,89.2913749627769
file name : Image_22032021144430932.png
|
2021-03-22 14:44:31.139728 |
129 |
39111465 |
Drain with slab from Kusum Chowdhury house to Mina Sharma house at Purba khairbari |
202301 |
Drain with slab from Kusum Chowdhury house to Mina Sharma house at Purba khairbari1 |
Completion of work |
-
latitude : 26.72301328741014,26.722664055414498
Longitude : 89.29208507761359,89.29167067632079
file name : Image_08022021150301409.png
|
2021-02-08 15:03:01.495395 |
130 |
39111465 |
Drain with slab from Kusum Chowdhury house to Mina Sharma house at Purba khairbari |
202301 |
Drain with slab from Kusum Chowdhury house to Mina Sharma house at Purba khairbari1 |
Completion of work |
-
latitude : 26.72301328741014,26.722664055414498
Longitude : 89.29208507761359,89.29167067632079
file name : Image_08022021150315608.png
|
2021-02-08 15:03:15.693279 |
131 |
39111465 |
Drain with slab from Kusum Chowdhury house to Mina Sharma house at Purba khairbari |
202301 |
Drain with slab from Kusum Chowdhury house to Mina Sharma house at Purba khairbari1 |
Completion of work |
-
latitude : 26.72301328741014,26.722664055414498
Longitude : 89.29208507761359,89.29167067632079
file name : Image_08022021150449861.png
|
2021-02-08 15:04:50.454642 |
132 |
39111415 |
Drain with slab from Madhya Khairbari ITDP Primary School to Durga Munda house at Madhya Khairbari |
293121 |
Drain with slab from Madhya Khairbari ITDP Primary School to Durga Munda house at Madhya Khairbari1 |
Roof laid |
-
latitude : 26.7191826319322,26.718904268927872
Longitude : 89.26351586356759,89.26289384253323
file name : Image_22032021154432143.png
|
2021-03-22 15:44:32.312361 |
133 |
39111415 |
Drain with slab from Madhya Khairbari ITDP Primary School to Durga Munda house at Madhya Khairbari |
293121 |
Drain with slab from Madhya Khairbari ITDP Primary School to Durga Munda house at Madhya Khairbari1 |
Plinth level |
-
latitude : 26.7188528040424,26.71913535799831
Longitude : 89.2628784198314,89.26352684386075
file name : Image_19032021154508888.png
|
2021-03-19 15:45:09.065421 |
134 |
39111415 |
Drain with slab from Madhya Khairbari ITDP Primary School to Durga Munda house at Madhya Khairbari |
293121 |
Drain with slab from Madhya Khairbari ITDP Primary School to Durga Munda house at Madhya Khairbari1 |
Completion of work |
-
latitude : 26.718802764080465,26.719086784869432
Longitude : 89.26283994689584,89.26335199736059
file name : Image_01022021153431942.png
|
2021-02-01 15:34:32.044626 |
135 |
34784306 |
CC drain from Bikash Pradhan house to Birey Tamang house at Mujnai Hatkhola |
249708 |
CC drain from Bikash Pradhan house to Birey Tamang house at Mujnai Hatkhola1 |
Roof laid |
-
latitude : 26.71861999668181,26.71930735465139
Longitude : 89.234086163342,89.23458823934197
file name : Image_09062021130316891.png
|
2021-06-09 13:03:17.001231 |
136 |
34784306 |
CC drain from Bikash Pradhan house to Birey Tamang house at Mujnai Hatkhola |
249708 |
CC drain from Bikash Pradhan house to Birey Tamang house at Mujnai Hatkhola1 |
Plinth level |
-
latitude : 26.7186368862167,26.71860432252288
Longitude : 89.23410963267088,89.23410736955702
file name : Image_03062021142157079.png
|
2021-06-03 14:21:57.196978 |
137 |
34784306 |
CC drain from Bikash Pradhan house to Birey Tamang house at Mujnai Hatkhola |
249708 |
CC drain from Bikash Pradhan house to Birey Tamang house at Mujnai Hatkhola1 |
Completion of work |
-
latitude : 26.719229025766253,26.718922373838723
Longitude : 89.23452545888722,89.23430702649057
file name : Image_08022021150306427.png
|
2021-02-08 15:03:06.518693 |
138 |
34784306 |
CC drain from Bikash Pradhan house to Birey Tamang house at Mujnai Hatkhola |
249708 |
CC drain from Bikash Pradhan house to Birey Tamang house at Mujnai Hatkhola1 |
Completion of work |
-
latitude : 26.719229025766253,26.718922373838723
Longitude : 89.23452545888722,89.23430702649057
file name : Image_08022021150319858.png
|
2021-02-08 15:03:19.946105 |
139 |
39111503 |
Drain with slab from Rakhal Das house to Swapan Das house at Uttar Madarihat |
188825 |
Drain with slab from Rakhal Das house to Swapan Das house at Uttar Madarihat1 |
Completion of work |
-
latitude : 26.700202859938145,26.7052831,26.7052831
Longitude : 89.02887420728803,89.2806472,89.2806472
file name : Image_28072021125049537.png
|
2021-07-28 12:50:49.716668 |
140 |
39111503 |
Drain with slab from Rakhal Das house to Swapan Das house at Uttar Madarihat |
188825 |
Drain with slab from Rakhal Das house to Swapan Das house at Uttar Madarihat1 |
Plinth level |
-
latitude : 26.704392763786018,26.7052627
Longitude : 89.28075945004821,89.2806704
file name : Image_26072021133055936.png
|
2021-07-26 13:30:56.06973 |
141 |
39111503 |
Drain with slab from Rakhal Das house to Swapan Das house at Uttar Madarihat |
188825 |
Drain with slab from Rakhal Das house to Swapan Das house at Uttar Madarihat1 |
Completion of work |
-
latitude : 26.700284415856004,26.7052936
Longitude : 89.02885031886399,89.2806834
file name : Image_22062021125533698.png
|
2021-06-22 12:55:33.806069 |
142 |
39112161 |
Drain with slab from Kamalesh adhikari house to Saraswati Dutta house at Aswini Nagar 2 |
193188 |
Drain with slab from Kamalesh adhikari house to Saraswati Dutta house at Aswini Nagar 2 1 |
Roof laid |
-
latitude : 26.68999106157571,26.689990642480552
Longitude : 89.27484937012196,89.27547147497535
file name : Image_21092021140117243.png
|
2021-09-21 14:01:17.320634 |
143 |
39112161 |
Drain with slab from Kamalesh adhikari house to Saraswati Dutta house at Aswini Nagar 2 |
193188 |
Drain with slab from Kamalesh adhikari house to Saraswati Dutta house at Aswini Nagar 2 1 |
Plinth level |
-
latitude : 26.69007819145918,26.689996551722288
Longitude : 89.27549418993294,89.2748645413667
file name : Image_21092021135641778.png
|
2021-09-21 13:56:41.877687 |
144 |
39112161 |
Drain with slab from Kamalesh adhikari house to Saraswati Dutta house at Aswini Nagar 2 |
193188 |
Drain with slab from Kamalesh adhikari house to Saraswati Dutta house at Aswini Nagar 2 1 |
Completion of work |
-
latitude : 26.68996822088957,26.69000887311995
Longitude : 89.27483579143882,89.27549343556166
file name : Image_21092021135316469.png
|
2021-09-21 13:53:16.564979 |
145 |
75267152 |
REPAIRING AND PAINTING OF MILAN PATHAGAR AT ASWINI NAGAR WARD NO III OF MADARIHAT |
246009 |
REPAIRING AND PAINTING OF MILAN PATHAGAR AT ASWINI NAGAR WARD NO III OF MADARIHAT1 |
Plinth level |
-
latitude : 26.6917749
Longitude : 89.2802005
file name : Image_15062023173535999.png
|
2023-06-15 17:35:36.743602 |
146 |
75267152 |
REPAIRING AND PAINTING OF MILAN PATHAGAR AT ASWINI NAGAR WARD NO III OF MADARIHAT |
246009 |
REPAIRING AND PAINTING OF MILAN PATHAGAR AT ASWINI NAGAR WARD NO III OF MADARIHAT1 |
Completion of work |
-
latitude : 26.6917531
Longitude : 89.2802329
file name : Image_13062023085410646.png
|
2023-06-13 08:54:10.755877 |
147 |
56909458 |
CC drain from Manager Bunglow to Mujnai Health Sub Centre |
344607 |
CC drain from Manager Bunglow to Mujnai Health Sub Centre1 |
Roof laid |
-
latitude : 26.722376849502325,26.722312686033547
Longitude : 89.2360149230808,89.23599480651319
file name : Image_14072023143821276.png
|
2023-07-14 14:38:21.381266 |
148 |
56909458 |
CC drain from Manager Bunglow to Mujnai Health Sub Centre |
344607 |
CC drain from Manager Bunglow to Mujnai Health Sub Centre1 |
Roof laid |
-
latitude : 26.722370060160756,26.722394325770438
Longitude : 89.23597242683172,89.23594669438899
file name : Image_14072023143844601.png
|
2023-07-14 14:38:44.701077 |
149 |
56909458 |
CC drain from Manager Bunglow to Mujnai Health Sub Centre |
344607 |
CC drain from Manager Bunglow to Mujnai Health Sub Centre1 |
Plinth level |
-
latitude : 26.721983905881643,26.72200234606862
Longitude : 89.23596245236695,89.23603009432554
file name : Image_14072023143004770.png
|
2023-07-14 14:30:04.877308 |
150 |
56909458 |
CC drain from Manager Bunglow to Mujnai Health Sub Centre |
344607 |
CC drain from Manager Bunglow to Mujnai Health Sub Centre1 |
Completion of work |
-
latitude : 26.722411382943392,26.722368760965765,26.722221029922366
Longitude : 89.23593780957162,89.23597083427012,89.23594728112221
file name : Image_14072023141650982.png
|
2023-07-14 14:16:51.07951 |
151 |
56909458 |
CC drain from Manager Bunglow to Mujnai Health Sub Centre |
344607 |
CC drain from Manager Bunglow to Mujnai Health Sub Centre1 |
Completion of work |
-
latitude : 26.722410544753075,26.72232228331268
Longitude : 89.23594669438899,89.23598893918097
file name : Image_14072023141718020.png
|
2023-07-14 14:17:18.115629 |
152 |
56973291 |
Culvert near Kaji Jamuruddin house at Madhya Khairbari |
161922 |
Culvert near Kaji Jamuruddin house at Madhya Khairbari1 |
Roof laid |
-
latitude : 26.71133553609252,26.71132145449519
Longitude : 89.25418462604284,89.25416191108525
file name : Image_19072023172043898.png
|
2023-07-19 17:20:43.992178 |
153 |
56973291 |
Culvert near Kaji Jamuruddin house at Madhya Khairbari |
161922 |
Culvert near Kaji Jamuruddin house at Madhya Khairbari1 |
Plinth level |
-
latitude : 26.711375853046775,26.711312443949282
Longitude : 89.25422318279743,89.25419460050762
file name : Image_19072023171223349.png
|
2023-07-19 17:12:23.450558 |
154 |
56973291 |
Culvert near Kaji Jamuruddin house at Madhya Khairbari |
161922 |
Culvert near Kaji Jamuruddin house at Madhya Khairbari1 |
Completion of work |
-
latitude : 26.711335661821067,26.7113598017022
Longitude : 89.2541625816375,89.25419912673533
file name : Image_19072023170522908.png
|
2023-07-19 17:05:23.012474 |
155 |
56792753 |
CC drain with slab and culvert from Durgi Dahal house at MNS nagar |
349636 |
CC drain with slab and culvert from Durgi Dahal house at MNS nagar1 |
Roof laid |
-
latitude : 26.71278,26.71278
Longitude : 89.2798458,89.2798458
file name : Image_12082024152417375.png
|
2024-08-12 15:24:17.470487 |
156 |
56792753 |
CC drain with slab and culvert from Durgi Dahal house at MNS nagar |
349636 |
CC drain with slab and culvert from Durgi Dahal house at MNS nagar1 |
Plinth level |
-
latitude : 26.7128229,26.7117483
Longitude : 89.2798176,89.2796287
file name : Image_12082024151040167.png
|
2024-08-12 15:10:40.282065 |
157 |
56792753 |
CC drain with slab and culvert from Durgi Dahal house at MNS nagar |
349636 |
CC drain with slab and culvert from Durgi Dahal house at MNS nagar1 |
Completion of work |
-
latitude : 26.712358170188963,26.71234375331551
Longitude : 89.27984037436545,89.27978320978582
file name : Image_01082024153230436.png
|
2024-08-01 15:32:30.528074 |
158 |
56792753 |
CC drain with slab and culvert from Durgi Dahal house at MNS nagar |
349636 |
CC drain with slab and culvert from Durgi Dahal house at MNS nagar1 |
Completion of work |
-
latitude : 26.7117133,26.7117122
Longitude : 89.2797384,89.2797404
file name : Image_01082024153225114.png
|
2024-08-01 15:32:25.21237 |
159 |
56792753 |
CC drain with slab and culvert from Durgi Dahal house at MNS nagar |
349636 |
CC drain with slab and culvert from Durgi Dahal house at MNS nagar1 |
Completion of work |
-
latitude : 26.7117133,26.7117122
Longitude : 89.2797384,89.2797404
file name : Image_01082024152922187.png
|
2024-08-01 15:29:22.289337 |
160 |
56794136 |
CC drain with slab from Alimun Ali house to Kartik das hotel at Aswini Nagar three |
348796 |
CC drain with slab from Alimun Ali house to Kartik das hotel at Aswini Nagar three1 |
Roof laid |
-
latitude : 26.6893085,26.6892863
Longitude : 89.2789296,89.2789304
file name : Image_11102023143148002.png
|
2023-10-11 14:31:49.859537 |
161 |
56794136 |
CC drain with slab from Alimun Ali house to Kartik das hotel at Aswini Nagar three |
348796 |
CC drain with slab from Alimun Ali house to Kartik das hotel at Aswini Nagar three1 |
Plinth level |
-
latitude : 26.6893015,26.6892737
Longitude : 89.2789188,89.2789337
file name : Image_11102023142427093.png
|
2023-10-11 14:24:27.189999 |
162 |
56794136 |
CC drain with slab from Alimun Ali house to Kartik das hotel at Aswini Nagar three |
348796 |
CC drain with slab from Alimun Ali house to Kartik das hotel at Aswini Nagar three1 |
Completion of work |
-
latitude : 26.6892814,26.689319
Longitude : 89.2789092,89.2788588
file name : Image_29092023161414104.png
|
2023-09-29 16:14:14.204523 |
163 |
57120861 |
Road with pavers block from Anjan Saha house to Bhojeswari Saha at Aswini Nagar ward no one |
197074 |
Road with pavers block from Anjan Saha house to Bhojeswari Saha at Aswini Nagar ward no one1 |
Roof laid |
-
latitude : 26.68972497805953,26.68970452621579
Longitude : 89.27259304560721,89.2725729290396
file name : Image_08082023132308478.png
|
2023-08-08 13:23:08.580868 |
164 |
57120861 |
Road with pavers block from Anjan Saha house to Bhojeswari Saha at Aswini Nagar ward no one |
197074 |
Road with pavers block from Anjan Saha house to Bhojeswari Saha at Aswini Nagar ward no one1 |
Plinth level |
-
latitude : 26.689680134877563,26.689703813754022
Longitude : 89.27267024293542,89.27251660265028
file name : Image_08082023131413753.png
|
2023-08-08 13:14:13.947689 |
165 |
57120861 |
Road with pavers block from Anjan Saha house to Bhojeswari Saha at Aswini Nagar ward no one |
197074 |
Road with pavers block from Anjan Saha house to Bhojeswari Saha at Aswini Nagar ward no one1 |
Completion of work |
-
latitude : 26.689644176512957,26.689664837904274
Longitude : 89.27266152575612,89.27258893847466
file name : Image_31072023100358789.png
|
2023-07-31 10:03:58.879444 |
166 |
75266498 |
Creation of drainage channel for management of grey water |
348663 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.692919405177236
Longitude : 89.26574469543993
file name : Image_08082023133440716.png
|
2023-08-08 13:34:40.84811 |
167 |
75266498 |
Creation of drainage channel for management of grey water |
348663 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.692903102375567
Longitude : 89.26554679870605
file name : Image_08082023132821772.png
|
2023-08-08 13:28:21.889811 |
168 |
75266498 |
Creation of drainage channel for management of grey water |
348663 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.6924842
Longitude : 89.2652283
file name : Image_31072023095720468.png
|
2023-07-31 09:57:20.576118 |
169 |
75266498 |
Creation of drainage channel for management of grey water |
348663 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.6924821
Longitude : 89.2652304
file name : Image_31072023095443043.png
|
2023-07-31 09:54:43.151782 |
170 |
56582518 |
Drinking water arrangement with solar system near Adivasi Club at Madhya Khairbari |
349729 |
Drinking water arrangement with solar system near Adivasi Club at Madhya Khairbari1 |
Completion of work |
-
latitude : 26.714993147179484
Longitude : 89.27053327672184
file name : Image_08082023142809080.png
|
2023-08-08 14:28:09.177984 |
171 |
57049664 |
Road with Pavers block from Dipak Oraon house to Mujnai River at Bangabari |
209642 |
Road with Pavers block from Dipak Oraon house to Mujnai River at Bangabari1 |
Roof laid |
-
latitude : 26.726643196307123,26.72660174779594
Longitude : 89.25485257990658,89.25483003258705
file name : Image_09082023150145033.png
|
2023-08-09 15:01:45.126174 |
172 |
57049664 |
Road with Pavers block from Dipak Oraon house to Mujnai River at Bangabari |
209642 |
Road with Pavers block from Dipak Oraon house to Mujnai River at Bangabari1 |
Plinth level |
-
latitude : 26.726626893505454,26.72649722546339
Longitude : 89.25484637729824,89.25482282415032
file name : Image_09082023145040615.png
|
2023-08-09 14:50:40.77805 |
173 |
57049664 |
Road with Pavers block from Dipak Oraon house to Mujnai River at Bangabari |
209642 |
Road with Pavers block from Dipak Oraon house to Mujnai River at Bangabari1 |
Completion of work |
-
latitude : 26.726623876020312,26.726588252931833
Longitude : 89.25480396486819,89.25482265651226
file name : Image_01082023154557986.png
|
2023-08-01 15:45:58.092681 |
174 |
56710049 |
Repairing of tubewell at all sansad under Madarihat GP |
621680 |
Repairing of tubewell at all sansad under Madarihat GP1 |
Completion of work |
-
latitude : 26.7076456
Longitude : 89.2805674
file name : Image_09082023140328090.png
|
2023-08-09 14:03:28.201518 |
175 |
57050410 |
Road with Pavers Block from Bishnu Majhi house to Jatru Oraon house at Uttar Chhekamari |
348871 |
Road with Pavers Block from Bishnu Majhi house to Jatru Oraon house at Uttar Chhekamari1 |
Completion of work |
-
latitude : 26.697442699223757,26.69772554654628
Longitude : 89.2572557553649,89.25735097378492
file name : Image_01082023162802724.png
|
2023-08-01 16:28:02.820832 |
176 |
57050410 |
Road with Pavers Block from Bishnu Majhi house to Jatru Oraon house at Uttar Chhekamari |
348871 |
Road with Pavers Block from Bishnu Majhi house to Jatru Oraon house at Uttar Chhekamari1 |
Completion of work |
-
latitude : 26.697490140795708,26.697490140795708
Longitude : 89.25723136402667,89.25723136402667
file name : Image_01082023162819003.png
|
2023-08-01 16:28:19.116055 |
177 |
57121416 |
CC road from Mihir Das house to four no Prymary School boundary at Pradhan Nagar |
200000 |
CC road from Mihir Das house to four no Prymary School boundary at Pradhan Nagar1 |
Roof laid |
-
latitude : 26.7056148,26.7055944,26.705148140899837
Longitude : 89.2795331,89.279526,89.27987272851169
file name : Image_09122023142427322.png
|
2023-12-09 14:24:27.4201 |
178 |
57121416 |
CC road from Mihir Das house to four no Prymary School boundary at Pradhan Nagar |
200000 |
CC road from Mihir Das house to four no Prymary School boundary at Pradhan Nagar1 |
Plinth level |
-
latitude : 26.7055262,26.7055246
Longitude : 89.2804468,89.2804421
file name : Image_06112023160043981.png
|
2023-11-06 16:00:44.219365 |
179 |
57121416 |
CC road from Mihir Das house to four no Prymary School boundary at Pradhan Nagar |
200000 |
CC road from Mihir Das house to four no Prymary School boundary at Pradhan Nagar1 |
Plinth level |
-
latitude : 26.705611,26.7052737,26.7052729
Longitude : 89.2795464,89.2802084,89.2802081
file name : Image_16102023153241907.png
|
2023-10-16 15:32:42.010108 |
180 |
57121416 |
CC road from Mihir Das house to four no Prymary School boundary at Pradhan Nagar |
200000 |
CC road from Mihir Das house to four no Prymary School boundary at Pradhan Nagar1 |
Completion of work |
-
latitude : 26.7052785,26.7052785
Longitude : 89.2802023,89.2801983
file name : Image_12102023150242739.png
|
2023-10-12 15:02:42.838358 |
181 |
75266818 |
Creation of a new source of drinking water |
217661 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 26.703854645602405
Longitude : 89.25117242150009
file name : Image_21082023153738189.png
|
2023-08-21 15:37:38.312532 |
182 |
75266818 |
Creation of a new source of drinking water |
217661 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 26.703817220404744
Longitude : 89.25123956054449
file name : Image_21082023153341327.png
|
2023-08-21 15:33:41.528982 |
183 |
75266818 |
Creation of a new source of drinking water |
217661 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 26.70382392592728
Longitude : 89.25114140845835
file name : Image_21082023152609211.png
|
2023-08-21 15:26:09.331871 |
184 |
75266818 |
Creation of a new source of drinking water |
217661 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 26.70377355068922
Longitude : 89.25117644481361
file name : Image_21082023152759698.png
|
2023-08-21 15:27:59.803942 |
185 |
75266818 |
Creation of a new source of drinking water |
217661 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.703785369172692
Longitude : 89.25120376981795
file name : Image_05082023093552288.png
|
2023-08-05 09:35:52.388938 |
186 |
70430792 |
Creation of drainage channel for management of grey water |
313501 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.7192122
Longitude : 89.2767047
file name : Image_16032024162540006.png
|
2024-03-16 16:25:40.099696 |
187 |
70430792 |
Creation of drainage channel for management of grey water |
313501 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.7187301
Longitude : 89.2765657
file name : Image_05022024140529039.png
|
2024-02-05 14:05:29.132942 |
188 |
70430792 |
Creation of drainage channel for management of grey water |
313501 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.7192266
Longitude : 89.2767329
file name : Image_12122023140155247.png
|
2023-12-12 14:01:55.3563 |
189 |
71737097 |
Installation of Tubewell |
321525 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 26.6929413
Longitude : 89.2792795
file name : Image_31072024101547160.png
|
2024-07-31 10:15:47.271126 |
190 |
71737097 |
Installation of Tubewell |
321525 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 26.6921702
Longitude : 89.2794048
file name : Image_31072024100813471.png
|
2024-07-31 10:08:13.560619 |
191 |
71737097 |
Installation of Tubewell |
321525 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 26.6932097
Longitude : 89.2791915
file name : Image_06012024135624501.png
|
2024-01-06 13:56:24.586063 |
192 |
70662225 |
Installation of Tubewell |
321525 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 26.718923253938556
Longitude : 89.26296710036695
file name : Image_06022024102129379.png
|
2024-02-06 10:21:29.495001 |
193 |
70662225 |
Installation of Tubewell |
321525 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 26.718970737420022
Longitude : 89.26301387138665
file name : Image_21012024112749447.png
|
2024-01-21 11:27:49.566046 |
194 |
70662225 |
Installation of Tubewell |
321525 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 26.71887455508113
Longitude : 89.26308226771653
file name : Image_31122023093346413.png
|
2023-12-31 09:33:46.505086 |
195 |
70662225 |
Installation of Tubewell |
321525 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 26.71879320871085
Longitude : 89.26341980695724
file name : Image_29122023114913118.png
|
2023-12-29 11:49:13.197433 |
196 |
70660342 |
Installation of Tubewell |
321525 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 26.708064037375152
Longitude : 89.25869258120656
file name : Image_06022024101112371.png
|
2024-02-06 10:11:12.459401 |
197 |
70660342 |
Installation of Tubewell |
321525 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 26.70806386973709
Longitude : 89.25876039080322
file name : Image_21012024111806447.png
|
2024-01-21 11:18:06.533131 |
198 |
70660342 |
Installation of Tubewell |
321525 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 26.708095050416887
Longitude : 89.25880590453744
file name : Image_21012024111801822.png
|
2024-01-21 11:18:01.909806 |
199 |
70660342 |
Installation of Tubewell |
321525 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 26.7080847825855
Longitude : 89.25873147323728
file name : Image_29122023121801432.png
|
2023-12-29 12:18:01.546607 |
200 |
75269427 |
office maintenance and painting and others |
300000 |
office maintenance and painting and others1 |
Roof laid |
-
latitude : 26.7078785
Longitude : 89.2805598
file name : Image_05022024170003795.png
|
2024-02-05 17:00:03.893961 |
201 |
75269427 |
office maintenance and painting and others |
300000 |
office maintenance and painting and others1 |
Plinth level |
-
latitude : 26.7078586
Longitude : 89.2805792
file name : Image_05022024164541451.png
|
2024-02-05 16:45:41.60333 |
202 |
75269427 |
office maintenance and painting and others |
300000 |
office maintenance and painting and others1 |
Plinth level |
-
latitude : 26.7077865
Longitude : 89.2805531
file name : Image_08082023153829622.png
|
2023-08-08 15:38:29.778564 |
203 |
75269427 |
office maintenance and painting and others |
300000 |
office maintenance and painting and others1 |
Completion of work |
-
latitude : 26.7077898
Longitude : 89.280573
file name : Image_31072023164711470.png
|
2023-07-31 16:47:11.580919 |
204 |
70429535 |
Creation of drainage channel for management of grey water |
300888 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.72266686335206
Longitude : 89.23592917621136
file name : Image_02022024142543136.png
|
2024-02-02 14:25:43.221706 |
205 |
70429535 |
Creation of drainage channel for management of grey water |
300888 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.722798626869917
Longitude : 89.2358748614788
file name : Image_08012024162524904.png
|
2024-01-08 16:25:25.003371 |
206 |
70429535 |
Creation of drainage channel for management of grey water |
300888 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.722518419846892
Longitude : 89.23593110404909
file name : Image_19122023092246186.png
|
2023-12-19 09:22:46.282489 |
207 |
71475696 |
Drainage Construction |
256043 |
Drainage Construction1 |
Roof laid |
-
latitude : 26.692995219491422
Longitude : 89.26620519720018
file name : Image_09012024095013071.png
|
2024-01-09 09:50:13.157812 |
208 |
71475696 |
Drainage Construction |
256043 |
Drainage Construction1 |
Plinth level |
-
latitude : 26.693000541999936
Longitude : 89.26637761294842
file name : Image_05012024121143691.png
|
2024-01-05 12:11:43.791453 |
209 |
71475696 |
Drainage Construction |
256043 |
Drainage Construction1 |
Plinth level |
-
latitude : 26.6927929
Longitude : 89.2672885
file name : Image_05012024121132399.png
|
2024-01-05 12:11:32.500652 |
210 |
71475696 |
Drainage Construction |
256043 |
Drainage Construction1 |
Plinth level |
-
latitude : 26.6927929
Longitude : 89.2672885
file name : Image_04012024130620466.png
|
2024-01-04 13:06:21.617756 |
211 |
71475696 |
Drainage Construction |
256043 |
Drainage Construction1 |
Completion of work |
-
latitude : 26.692950585857034
Longitude : 89.26622003316879
file name : Image_12122023093017752.png
|
2023-12-12 09:30:17.875844 |
212 |
70349973 |
Creation of drainage channel for management of grey water |
318779 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.7224709
Longitude : 89.2897725
file name : Image_18012024134257731.png
|
2024-01-18 13:42:57.834014 |
213 |
70349973 |
Creation of drainage channel for management of grey water |
318779 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.7215045
Longitude : 89.2892523
file name : Image_28122023154312425.png
|
2023-12-28 15:43:12.532567 |
214 |
70349973 |
Creation of drainage channel for management of grey water |
318779 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.72023
Longitude : 89.2892835
file name : Image_12122023105655327.png
|
2023-12-12 10:56:55.476574 |
215 |
75266358 |
INSTALLATION OF SOLAR HIGH MAST LIGHT NEAR FISH MARKET AT MADARIHAT DIN BAZAR |
349613 |
INSTALLATION OF SOLAR HIGH MAST LIGHT NEAR FISH MARKET AT MADARIHAT DIN BAZAR1 |
Roof laid |
-
latitude : 26.691438029520214
Longitude : 89.27820355631411
file name : Image_19032024120538171.png
|
2024-03-19 12:05:38.301352 |
216 |
75266358 |
INSTALLATION OF SOLAR HIGH MAST LIGHT NEAR FISH MARKET AT MADARIHAT DIN BAZAR |
349613 |
INSTALLATION OF SOLAR HIGH MAST LIGHT NEAR FISH MARKET AT MADARIHAT DIN BAZAR1 |
Roof laid |
-
latitude : 26.69140802230686
Longitude : 89.27820707671344
file name : Image_19032024120551925.png
|
2024-03-19 12:05:52.043701 |
217 |
75266358 |
INSTALLATION OF SOLAR HIGH MAST LIGHT NEAR FISH MARKET AT MADARIHAT DIN BAZAR |
349613 |
INSTALLATION OF SOLAR HIGH MAST LIGHT NEAR FISH MARKET AT MADARIHAT DIN BAZAR1 |
Plinth level |
-
latitude : 26.6916146
Longitude : 89.2783478
file name : Image_14032024132243168.png
|
2024-03-14 13:22:43.25203 |
218 |
75266358 |
INSTALLATION OF SOLAR HIGH MAST LIGHT NEAR FISH MARKET AT MADARIHAT DIN BAZAR |
349613 |
INSTALLATION OF SOLAR HIGH MAST LIGHT NEAR FISH MARKET AT MADARIHAT DIN BAZAR1 |
Completion of work |
-
latitude : 26.6915846
Longitude : 89.2784343
file name : Image_13122023131035210.png
|
2023-12-13 13:10:35.31767 |
219 |
71648721 |
Construction of roads |
223768 |
Construction of roads1 |
Roof laid |
-
latitude : 26.717682480812073,26.7182485
Longitude : 89.28325574845076,89.2876032
file name : Image_20012024122817506.png
|
2024-01-20 12:28:17.597927 |
220 |
71648721 |
Construction of roads |
223768 |
Construction of roads1 |
Plinth level |
-
latitude : 26.71773583162576,26.717659179121256
Longitude : 89.28322406485677,89.28323278203607
file name : Image_08012024134819897.png
|
2024-01-08 13:48:20.060232 |
221 |
71648721 |
Construction of roads |
223768 |
Construction of roads1 |
Completion of work |
-
latitude : 26.717361034825444,26.717556584626436
Longitude : 89.28329162299633,89.28323227912188
file name : Image_24122023152129935.png
|
2023-12-24 15:21:30.039852 |
222 |
71644459 |
Repairing and maintenance of roads |
222764 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 26.69577256310731,26.69574071187526
Longitude : 89.27646540105343,89.27637789398432
file name : Image_15122023091433233.png
|
2023-12-15 09:14:33.32269 |
223 |
71643664 |
Construction of roads |
346669 |
Construction of roads1 |
Roof laid |
-
latitude : 26.700054835528135,26.70015403535217
Longitude : 89.28535985760391,89.28532700054348
file name : Image_20012024134218688.png
|
2024-01-20 13:42:18.767818 |
224 |
71643664 |
Construction of roads |
346669 |
Construction of roads1 |
Plinth level |
-
latitude : 26.70023416634649,26.70030620880425
Longitude : 89.28524083457887,89.28534493781626
file name : Image_08012024144246440.png
|
2024-01-08 14:42:46.612024 |
225 |
71643664 |
Construction of roads |
346669 |
Construction of roads1 |
Completion of work |
-
latitude : 26.70029384549707,26.70059354044497
Longitude : 89.28536371327937,89.28543755784631
file name : Image_15122023090606359.png
|
2023-12-15 09:06:06.466152 |
226 |
71647162 |
Construction of roads |
223004 |
Construction of roads1 |
Roof laid |
-
latitude : 26.724160686135292,26.724173133261502
Longitude : 89.25301484763622,89.25312574021518
file name : Image_02022024141548608.png
|
2024-02-02 14:15:48.74262 |
227 |
71647162 |
Construction of roads |
223004 |
Construction of roads1 |
Roof laid |
-
latitude : 26.724505266174674,26.72415087930858
Longitude : 89.25290462560952,89.25320184789598
file name : Image_02022024141539010.png
|
2024-02-02 14:15:39.118687 |
228 |
71647162 |
Construction of roads |
223004 |
Construction of roads1 |
Plinth level |
-
latitude : 26.724134157411754,26.72413621097803
Longitude : 89.25298282876611,89.25315465778112
file name : Image_08012024161411147.png
|
2024-01-08 16:14:11.237641 |
229 |
71647162 |
Construction of roads |
223004 |
Construction of roads1 |
Completion of work |
-
latitude : 26.724074687808752,26.724062240682542
Longitude : 89.25306254066527,89.2533237207681
file name : Image_19122023090736290.png
|
2023-12-19 09:07:36.403825 |
230 |
56976571 |
Solar light ner Jariful Islam house at Madhya Khairbari |
35496 |
Solar light ner Jariful Islam house at Madhya Khairbari1 |
Roof laid |
-
latitude : 26.72397343441844
Longitude : 89.27305564284325
file name : Image_05012024160912423.png
|
2024-01-05 16:09:12.524891 |
231 |
56976571 |
Solar light ner Jariful Islam house at Madhya Khairbari |
35496 |
Solar light ner Jariful Islam house at Madhya Khairbari1 |
Plinth level |
-
latitude : 26.724053230136633
Longitude : 89.27305882796645
file name : Image_29122023161426220.png
|
2023-12-29 16:14:26.331692 |
232 |
56976571 |
Solar light ner Jariful Islam house at Madhya Khairbari |
35496 |
Solar light ner Jariful Islam house at Madhya Khairbari1 |
Completion of work |
-
latitude : 26.724030934274197
Longitude : 89.27305849269032
file name : Image_24122023145744906.png
|
2023-12-24 14:57:44.877994 |
233 |
56976442 |
Solar light near Ramjhan Ali house at Madhya Khairbari |
35496 |
Solar light near Ramjhan Ali house at Madhya Khairbari1 |
Roof laid |
-
latitude : 26.725043635815382
Longitude : 89.27100341767073
file name : Image_05012024155509570.png
|
2024-01-05 15:55:09.66507 |
234 |
56976442 |
Solar light near Ramjhan Ali house at Madhya Khairbari |
35496 |
Solar light near Ramjhan Ali house at Madhya Khairbari1 |
Plinth level |
-
latitude : 26.725037014111876
Longitude : 89.27101607434452
file name : Image_29122023161008225.png
|
2023-12-29 16:10:08.33003 |
235 |
56976442 |
Solar light near Ramjhan Ali house at Madhya Khairbari |
35496 |
Solar light near Ramjhan Ali house at Madhya Khairbari1 |
Completion of work |
-
latitude : 26.7255106754601
Longitude : 89.27013865672052
file name : Image_24122023144345188.png
|
2023-12-24 14:43:45.3065 |
236 |
56976206 |
Solar light near Bulbul Islam house at Madhya Khairbari |
35496 |
Solar light near Bulbul Islam house at Madhya Khairbari1 |
Roof laid |
-
latitude : 26.722936257719994
Longitude : 89.2666545510292
file name : Image_05012024160422560.png
|
2024-01-05 16:04:22.667068 |
237 |
56976206 |
Solar light near Bulbul Islam house at Madhya Khairbari |
35496 |
Solar light near Bulbul Islam house at Madhya Khairbari1 |
Plinth level |
-
latitude : 26.722991452552378
Longitude : 89.26661582663655
file name : Image_29122023160138055.png
|
2023-12-29 16:01:38.178568 |
238 |
56976206 |
Solar light near Bulbul Islam house at Madhya Khairbari |
35496 |
Solar light near Bulbul Islam house at Madhya Khairbari1 |
Completion of work |
-
latitude : 26.722952602431178
Longitude : 89.26661792211235
file name : Image_24122023145209780.png
|
2023-12-24 14:52:09.76286 |
239 |
56975994 |
Solar Light near Md Nur Ali house at Madhya Khairbari |
35496 |
Solar Light near Md Nur Ali house at Madhya Khairbari1 |
Roof laid |
-
latitude : 26.7256885
Longitude : 89.2701332
file name : Image_05012024155300267.png
|
2024-01-05 15:53:00.363247 |
240 |
56975994 |
Solar Light near Md Nur Ali house at Madhya Khairbari |
35496 |
Solar Light near Md Nur Ali house at Madhya Khairbari1 |
Plinth level |
-
latitude : 26.725657652132213
Longitude : 89.26990597508848
file name : Image_29122023160723299.png
|
2023-12-29 16:07:23.410621 |
241 |
56975994 |
Solar Light near Md Nur Ali house at Madhya Khairbari |
35496 |
Solar Light near Md Nur Ali house at Madhya Khairbari1 |
Completion of work |
-
latitude : 26.7256875
Longitude : 89.2701311
file name : Image_24122023144104091.png
|
2023-12-24 14:41:04.2032 |
242 |
71627152 |
Installation of Tubewell |
350000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 26.725905505008996
Longitude : 89.27729311399162
file name : Image_02102024172250343.png
|
2024-10-02 17:22:50.47492 |
243 |
71627152 |
Installation of Tubewell |
350000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 26.725797629915178
Longitude : 89.27720116451383
file name : Image_27062024134632776.png
|
2024-06-27 13:46:32.885931 |
244 |
71627152 |
Installation of Tubewell |
350000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 26.725771268829703
Longitude : 89.27712782286108
file name : Image_27062024134411196.png
|
2024-06-27 13:44:11.293002 |
245 |
71627152 |
Installation of Tubewell |
350000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 26.725781075656414
Longitude : 89.2771527171135
file name : Image_24122023130821920.png
|
2023-12-24 13:08:22.024308 |
246 |
71604560 |
Installation of Tubewell |
321525 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 26.699363831430674
Longitude : 89.28506598807871
file name : Image_23082024181417438.png
|
2024-08-23 18:14:17.52842 |
247 |
71604560 |
Installation of Tubewell |
321525 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 26.699358173646033
Longitude : 89.28499717265368
file name : Image_23082024180945745.png
|
2024-08-23 18:09:45.820196 |
248 |
71604560 |
Installation of Tubewell |
321525 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 26.699304906651378
Longitude : 89.28493556566536
file name : Image_24122023123828444.png
|
2023-12-24 12:38:28.548539 |
249 |
71626209 |
Installation of Tubewell |
321525 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 26.6907894
Longitude : 89.2783791
file name : Image_23082024182625565.png
|
2024-08-23 18:26:25.762015 |
250 |
71626209 |
Installation of Tubewell |
321525 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 26.69069937430322
Longitude : 89.2779418732971
file name : Image_23082024182248345.png
|
2024-08-23 18:22:48.495446 |
251 |
71626209 |
Installation of Tubewell |
321525 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 26.6908608
Longitude : 89.2783855
file name : Image_23082024151211590.png
|
2024-08-23 15:12:11.769155 |
252 |
71486758 |
Operation & maintenance of Grey water management system |
200000 |
Operation & maintenance of Grey water management system1 |
Roof laid |
-
latitude : 26.6920467
Longitude : 89.2725788
file name : Image_15032024164120936.png
|
2024-03-15 16:41:21.022595 |
253 |
71486758 |
Operation & maintenance of Grey water management system |
200000 |
Operation & maintenance of Grey water management system1 |
Plinth level |
-
latitude : 26.6920509
Longitude : 89.2725348
file name : Image_15032024163748074.png
|
2024-03-15 16:37:48.160383 |
254 |
71486758 |
Operation & maintenance of Grey water management system |
200000 |
Operation & maintenance of Grey water management system1 |
Completion of work |
-
latitude : 26.692068
Longitude : 89.2725321
file name : Image_15032024163143928.png
|
2024-03-15 16:31:44.022966 |
255 |
70916164 |
Creation of drainage channel for management of grey water |
370000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.6920557
Longitude : 89.2725765
file name : Image_16032024091600799.png
|
2024-03-16 09:16:00.904445 |
256 |
70916164 |
Creation of drainage channel for management of grey water |
370000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.6920225
Longitude : 89.2725744
file name : Image_16032024091055919.png
|
2024-03-16 09:10:56.010113 |
257 |
70916164 |
Creation of drainage channel for management of grey water |
370000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.6920575
Longitude : 89.2725846
file name : Image_16032024090654374.png
|
2024-03-16 09:06:54.481059 |
258 |
71601463 |
Installation of Tubewell |
610840 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 26.725379
Longitude : 89.2861073
file name : Image_22032024144744883.png
|
2024-03-22 14:47:44.975186 |
259 |
71601463 |
Installation of Tubewell |
610840 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 26.7253786
Longitude : 89.2861074
file name : Image_21032024141905134.png
|
2024-03-21 14:19:05.236827 |
260 |
71601463 |
Installation of Tubewell |
610840 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 26.72780543100089
Longitude : 89.25880992785096
file name : Image_22032024144503366.png
|
2024-03-22 14:45:03.460527 |
261 |
71601463 |
Installation of Tubewell |
610840 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 26.72780543100089
Longitude : 89.25880992785096
file name : Image_22032024144410926.png
|
2024-03-22 14:44:11.026016 |
262 |
71601463 |
Installation of Tubewell |
610840 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 26.72780543100089
Longitude : 89.25880992785096
file name : Image_22032024144038816.png
|
2024-03-22 14:40:38.913791 |
263 |
71601463 |
Installation of Tubewell |
610840 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 26.727745290845633
Longitude : 89.25877464003861
file name : Image_22032024142321271.png
|
2024-03-22 14:23:21.385595 |
264 |
71601463 |
Installation of Tubewell |
610840 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 26.727745290845633
Longitude : 89.25877464003861
file name : Image_22032024142203192.png
|
2024-03-22 14:22:03.305158 |
265 |
71601463 |
Installation of Tubewell |
610840 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 26.727762264199555
Longitude : 89.25879123620689
file name : Image_22032024093111360.png
|
2024-03-22 09:31:11.472392 |
266 |
71601463 |
Installation of Tubewell |
610840 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 26.7046681
Longitude : 89.2804232
file name : Image_21032024133615345.png
|
2024-03-21 13:36:15.436695 |
267 |
71601463 |
Installation of Tubewell |
610840 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 26.70534733682871
Longitude : 89.28007515147328
file name : Image_21032024132159115.png
|
2024-03-21 13:21:59.253454 |
268 |
71601463 |
Installation of Tubewell |
610840 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 26.705306600779295
Longitude : 89.28010390140116
file name : Image_21032024130005370.png
|
2024-03-21 13:00:05.456764 |
269 |
71601463 |
Installation of Tubewell |
610840 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 26.7053840495646
Longitude : 89.280148409307
file name : Image_21032024125959114.png
|
2024-03-21 12:59:59.203373 |
270 |
70431853 |
Creation of drainage channel for management of grey water |
315425 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.7360704
Longitude : 89.2703516
file name : Image_08012024152605925.png
|
2024-01-08 15:26:06.061307 |
271 |
70431853 |
Creation of drainage channel for management of grey water |
315425 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.7360706
Longitude : 89.2703484
file name : Image_27122023130901669.png
|
2023-12-27 13:09:01.779465 |
272 |
70431853 |
Creation of drainage channel for management of grey water |
315425 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.735888058319688
Longitude : 89.27162778563797
file name : Image_12122023132450871.png
|
2023-12-12 13:24:50.964322 |
273 |
95755167 |
Construction of roads |
300000 |
Construction of roads1 |
Roof laid |
-
latitude : 26.721036667004228,26.721399100497365
Longitude : 89.23504270613194,89.2350862082094
file name : Image_02102024163124846.png
|
2024-10-02 16:31:24.926242 |
274 |
95755167 |
Construction of roads |
300000 |
Construction of roads1 |
Plinth level |
-
latitude : 26.7203222354874,26.72051803674549
Longitude : 89.23499803058803,89.23498244024813
file name : Image_02102024161747790.png
|
2024-10-02 16:17:47.878594 |
275 |
95755167 |
Construction of roads |
300000 |
Construction of roads1 |
Completion of work |
-
latitude : 26.720177186653018,26.71999961603433
Longitude : 89.2350510880351,89.23511831089854
file name : Image_02102024160132585.png
|
2024-10-02 16:01:32.67967 |
276 |
95756379 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 26.725510088726878,26.725636613555253
Longitude : 89.2923419829458,89.29238783195615
file name : Image_24092024171657730.png
|
2024-09-24 17:16:57.811684 |
277 |
95756379 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 26.7259078938514,26.72585093881935
Longitude : 89.29245513863862,89.29243619553745
file name : Image_24092024171223371.png
|
2024-09-24 17:12:23.454965 |
278 |
95756379 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 26.725393286906183,26.725485362112522
Longitude : 89.29232169874012,89.29236151278019
file name : Image_24092024170706559.png
|
2024-09-24 17:07:06.645076 |
279 |
71620125 |
Installation of Tubewell |
311316 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 26.715707913972437
Longitude : 89.23344201408327
file name : Image_02102024164736244.png
|
2024-10-02 16:47:36.335583 |
280 |
71620125 |
Installation of Tubewell |
311316 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 26.715713404119015
Longitude : 89.23345760442317
file name : Image_02102024164315228.png
|
2024-10-02 16:43:15.323095 |
281 |
71620125 |
Installation of Tubewell |
311316 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 26.7157829
Longitude : 89.2341496
file name : Image_27062024143902200.png
|
2024-06-27 14:39:02.295699 |
282 |
71620125 |
Installation of Tubewell |
311316 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 26.7157834
Longitude : 89.2341324
file name : Image_24122023133024601.png
|
2023-12-24 13:30:24.726376 |
283 |
89133998 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 26.72537610400468
Longitude : 89.25441856496036
file name : Image_25102024152415949.png
|
2024-10-25 15:24:16.276161 |
284 |
89133998 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 26.725370781496167
Longitude : 89.25444002263248
file name : Image_25102024151950339.png
|
2024-10-25 15:19:50.443932 |
285 |
89133998 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.725355819799006
Longitude : 89.25448084250093
file name : Image_25102024151214930.png
|
2024-10-25 15:12:15.178784 |
286 |
89134713 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 26.696415916085243
Longitude : 89.26059351302683
file name : Image_23092024145440538.png
|
2024-09-23 14:54:40.628599 |
287 |
89134713 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 26.696437331847847
Longitude : 89.26054380834103
file name : Image_23092024143323839.png
|
2024-09-23 14:33:23.96393 |
288 |
89134713 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.696443995460868
Longitude : 89.26053299568594
file name : Image_18092024100334275.png
|
2024-09-18 10:03:34.374058 |
289 |
91837669 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 26.732751298695803
Longitude : 89.26290582865477
file name : Image_21102024154759935.png
|
2024-10-21 15:48:00.04258 |
290 |
91837669 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 26.73275020904839
Longitude : 89.26293851807714
file name : Image_02102024171341876.png
|
2024-10-02 17:13:41.9591 |
291 |
91837669 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.732716471888125
Longitude : 89.26291915588081
file name : Image_20092024130906812.png
|
2024-09-20 13:09:06.919103 |
292 |
89134178 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 26.693641380406916
Longitude : 89.27282790653408
file name : Image_23092024170901106.png
|
2024-09-23 17:09:01.188668 |
293 |
89134178 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 26.6936601
Longitude : 89.2729527
file name : Image_23092024165805619.png
|
2024-09-23 16:58:05.707666 |
294 |
89134178 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.693613845854998
Longitude : 89.27283402532339
file name : Image_18092024102545479.png
|
2024-09-18 10:25:45.573262 |
295 |
96116448 |
Creation of a new source of drinking water |
300000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 26.71513128094375
Longitude : 89.25307276658714
file name : Image_23092024141412654.png
|
2024-09-23 14:14:12.739128 |
296 |
96116448 |
Creation of a new source of drinking water |
300000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 26.71508325263858
Longitude : 89.25312012434006
file name : Image_23092024140853420.png
|
2024-09-23 14:08:52.247657 |
297 |
96116448 |
Creation of a new source of drinking water |
300000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 26.71513454988599
Longitude : 89.25315985456109
file name : Image_18092024094803279.png
|
2024-09-18 09:48:03.371727 |
298 |
91684363 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 26.699556782841682
Longitude : 89.28413878194988
file name : Image_22102024140748860.png
|
2024-10-22 14:07:55.534958 |
299 |
91683939 |
Drainage Construction |
300000 |
Drainage Construction1 |
Roof laid |
-
latitude : 26.6987178
Longitude : 89.2836412
file name : Image_21102024165022472.png
|
2024-10-21 16:50:22.568137 |
300 |
91683939 |
Drainage Construction |
300000 |
Drainage Construction1 |
Plinth level |
-
latitude : 26.69863519258797
Longitude : 89.2839149851352
file name : Image_21102024164431741.png
|
2024-10-21 16:44:31.938575 |
301 |
91683939 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 26.698572956956923
Longitude : 89.28393845446408
file name : Image_21102024152710356.png
|
2024-10-21 15:27:10.472883 |
302 |
91683939 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 26.698574759066105
Longitude : 89.28394122049212
file name : Image_21102024152652622.png
|
2024-10-21 15:26:52.717881 |
303 |
91682859 |
Drainage Construction |
350000 |
Drainage Construction1 |
Plinth level |
-
latitude : 26.715986444614828
Longitude : 89.23426553606987
file name : Image_25102024154146772.png
|
2024-10-25 15:41:46.865848 |
304 |
91682859 |
Drainage Construction |
350000 |
Drainage Construction1 |
Completion of work |
-
latitude : 26.71601192560047
Longitude : 89.23435212112963
file name : Image_25102024153821524.png
|
2024-10-25 15:38:21.640576 |
305 |
91683775 |
Drainage Construction |
300000 |
Drainage Construction1 |
Roof laid |
-
latitude : 26.692203590646386
Longitude : 89.28052383475006
file name : Image_05112024065854012.png
|
2024-11-05 06:58:54.090975 |
306 |
91683775 |
Drainage Construction |
300000 |
Drainage Construction1 |
Plinth level |
-
latitude : 26.6920587
Longitude : 89.2806556
file name : Image_05112024065045378.png
|
2024-11-05 06:50:45.495699 |
307 |
91683775 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 26.692320434376597
Longitude : 89.28053992800415
file name : Image_21102024165755433.png
|
2024-10-21 16:57:55.509752 |
308 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places1 |
Roof laid |
-
latitude : 26.6938751
Longitude : 89.281114
file name : Image_03102024151917631.png
|
2024-10-03 15:19:17.728366 |
309 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places1 |
Plinth level |
-
latitude : 26.6915784
Longitude : 89.2755147
file name : Image_02102024094743288.png
|
2024-10-02 09:47:43.374805 |
310 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places1 |
Completion of work |
-
latitude : 26.6935673
Longitude : 89.2800583
file name : Image_01102024093714678.png
|
2024-10-01 09:37:14.774343 |
311 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places2 |
Roof laid |
-
latitude : 26.694136
Longitude : 89.2811978
file name : Image_03102024152053627.png
|
2024-10-03 15:20:53.711581 |
312 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places2 |
Plinth level |
-
latitude : 26.689901459030807
Longitude : 89.27845945581794
file name : Image_02102024095300242.png
|
2024-10-02 09:53:00.334212 |
313 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places2 |
Completion of work |
-
latitude : 26.693249358795583
Longitude : 89.28046591579914
file name : Image_01102024094552365.png
|
2024-10-01 09:45:52.452182 |
314 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places3 |
Roof laid |
-
latitude : 26.6944041
Longitude : 89.2813895
file name : Image_03102024152317814.png
|
2024-10-03 15:23:17.919306 |
315 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places3 |
Plinth level |
-
latitude : 26.6896339
Longitude : 89.2783275
file name : Image_02102024095847381.png
|
2024-10-02 09:58:47.474209 |
316 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places3 |
Completion of work |
-
latitude : 26.693246
Longitude : 89.280815
file name : Image_01102024094729838.png
|
2024-10-01 09:47:29.934195 |
317 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places4 |
Roof laid |
-
latitude : 26.6931979
Longitude : 89.2807688
file name : Image_03102024153100828.png
|
2024-10-03 15:31:00.926386 |
318 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places4 |
Plinth level |
-
latitude : 26.693200785666704
Longitude : 89.28045091219246
file name : Image_02102024100706119.png
|
2024-10-02 10:07:06.20461 |
319 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places4 |
Completion of work |
-
latitude : 26.6927319
Longitude : 89.2804899
file name : Image_01102024095055578.png
|
2024-10-01 09:50:55.682681 |
320 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places5 |
Roof laid |
-
latitude : 26.6927493
Longitude : 89.280488
file name : Image_03102024153445195.png
|
2024-10-03 15:34:45.285381 |
321 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places5 |
Plinth level |
-
latitude : 26.6935614
Longitude : 89.2800559
file name : Image_02102024100841332.png
|
2024-10-02 10:08:41.417117 |
322 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places5 |
Completion of work |
-
latitude : 26.689826021902263
Longitude : 89.27863681688905
file name : Image_01102024095524963.png
|
2024-10-01 09:55:25.086961 |
323 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places6 |
Roof laid |
-
latitude : 26.692711
Longitude : 89.2804787
file name : Image_03102024153657032.png
|
2024-10-03 15:36:57.122105 |
324 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places6 |
Plinth level |
-
latitude : 26.6932081
Longitude : 89.2808067
file name : Image_02102024101630130.png
|
2024-10-02 10:16:28.580476 |
325 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places6 |
Completion of work |
-
latitude : 26.6896066
Longitude : 89.2783882
file name : Image_01102024095819932.png
|
2024-10-01 09:58:20.022847 |
326 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places7 |
Roof laid |
-
latitude : 26.6895794
Longitude : 89.2785027
file name : Image_03102024155113749.png
|
2024-10-03 15:51:13.832194 |
327 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places7 |
Plinth level |
-
latitude : 26.6938445
Longitude : 89.2811089
file name : Image_02102024101912127.png
|
2024-10-02 10:19:12.221964 |
328 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places7 |
Completion of work |
-
latitude : 26.6939027
Longitude : 89.2811386
file name : Image_01102024100953650.png
|
2024-10-01 10:09:53.770301 |
329 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places8 |
Roof laid |
-
latitude : 26.689857495948672
Longitude : 89.27866372279823
file name : Image_03102024155222425.png
|
2024-10-03 15:52:22.513264 |
330 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places8 |
Plinth level |
-
latitude : 26.6941732
Longitude : 89.2812349
file name : Image_02102024102142856.png
|
2024-10-02 10:21:42.199971 |
331 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places8 |
Completion of work |
-
latitude : 26.6942435
Longitude : 89.2813206
file name : Image_01102024101319848.png
|
2024-10-01 10:13:19.943868 |
332 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places9 |
Roof laid |
-
latitude : 26.690033725462854
Longitude : 89.2785167042166
file name : Image_03102024155635073.png
|
2024-10-03 15:56:35.161844 |
333 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places9 |
Plinth level |
-
latitude : 26.69513750821352
Longitude : 89.28175195120275
file name : Image_02102024102352420.png
|
2024-10-02 10:23:52.401792 |
334 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places9 |
Completion of work |
-
latitude : 26.6949379
Longitude : 89.2817987
file name : Image_01102024101551609.png
|
2024-10-01 10:15:51.696219 |
335 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places10 |
Roof laid |
-
latitude : 26.691526
Longitude : 89.2754844
file name : Image_03102024155910792.png
|
2024-10-03 15:59:10.896647 |
336 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places10 |
Plinth level |
-
latitude : 26.6928568
Longitude : 89.280531
file name : Image_02102024103923160.png
|
2024-10-02 10:39:23.257982 |
337 |
70760142 |
Purchase of segregation bins to be fixed at public places |
240000 |
Purchase of segregation bins to be fixed at public places10 |
Completion of work |
-
latitude : 26.6913687
Longitude : 89.2752968
file name : Image_01102024105245073.png
|
2024-10-01 10:52:45.170457 |
338 |
71642213 |
Boundary wall and Gate |
349876 |
Boundary wall and Gate1 |
Roof laid |
-
latitude : 26.688847518526018
Longitude : 89.27408393472433
file name : Image_09012024091556462.png
|
2024-01-09 09:15:56.559077 |
339 |
71642213 |
Boundary wall and Gate |
349876 |
Boundary wall and Gate1 |
Plinth level |
-
latitude : 26.688867593184114
Longitude : 89.27422215230763
file name : Image_24122023120451828.png
|
2023-12-24 12:04:51.74772 |
340 |
71642213 |
Boundary wall and Gate |
349876 |
Boundary wall and Gate1 |
Completion of work |
-
latitude : 26.688843495212495
Longitude : 89.27398678846657
file name : Image_14122023112047643.png
|
2023-12-14 11:20:47.736827 |
341 |
70441952 |
Operation & maintenance of Grey water management system |
330000 |
Operation & maintenance of Grey water management system1 |
Roof laid |
-
latitude : 26.6934948
Longitude : 89.279456
file name : Image_01102024155343113.png
|
2024-10-01 15:53:43.202086 |
342 |
70441952 |
Operation & maintenance of Grey water management system |
330000 |
Operation & maintenance of Grey water management system1 |
Plinth level |
-
latitude : 26.6934955
Longitude : 89.2794663
file name : Image_01102024154512429.png
|
2024-10-01 15:45:12.522043 |
343 |
70441952 |
Operation & maintenance of Grey water management system |
330000 |
Operation & maintenance of Grey water management system1 |
Plinth level |
-
latitude : 26.6934851
Longitude : 89.2794652
file name : Image_01102024154421237.png
|
2024-10-01 15:44:21.322328 |
344 |
70441952 |
Operation & maintenance of Grey water management system |
330000 |
Operation & maintenance of Grey water management system1 |
Completion of work |
-
latitude : 26.6934874
Longitude : 89.279471
file name : Image_01102024093237284.png
|
2024-10-01 09:32:37.376926 |
345 |
71701130 |
Maintenance of Street Lights |
500000 |
Maintenance of Street Lights1 |
Roof laid |
-
latitude : 26.70773219782859
Longitude : 89.2804713640362
file name : Image_01102024152350800.png
|
2024-10-01 15:23:50.920621 |
346 |
71701130 |
Maintenance of Street Lights |
500000 |
Maintenance of Street Lights1 |
Plinth level |
-
latitude : 26.707748961634934
Longitude : 89.28045116364956
file name : Image_01102024150757017.png
|
2024-10-01 15:07:57.121058 |
347 |
71701130 |
Maintenance of Street Lights |
500000 |
Maintenance of Street Lights1 |
Completion of work |
-
latitude : 26.70768840238452
Longitude : 89.28053087554872
file name : Image_01102024135218822.png
|
2024-10-01 13:52:19.06991 |
348 |
71563108 |
Use of LED buls/LED tubelights for street lights |
380000 |
Use of LED buls/LED tubelights for street lights1 |
Roof laid |
-
latitude : 26.707587274722755
Longitude : 89.28038662299514
file name : Image_01102024152528054.png
|
2024-10-01 15:25:28.194744 |
349 |
71563108 |
Use of LED buls/LED tubelights for street lights |
380000 |
Use of LED buls/LED tubelights for street lights1 |
Plinth level |
-
latitude : 26.7075899
Longitude : 89.2803832
file name : Image_01102024150940350.png
|
2024-10-01 15:09:40.479916 |
350 |
71563108 |
Use of LED buls/LED tubelights for street lights |
380000 |
Use of LED buls/LED tubelights for street lights1 |
Completion of work |
-
latitude : 26.7075826
Longitude : 89.2803935
file name : Image_01102024134041908.png
|
2024-10-01 13:40:42.029364 |
351 |
70428904 |
Creation of drainage channel for management of grey water |
301911 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.72491983510554
Longitude : 89.25254101864994
file name : Image_02022024135715081.png
|
2024-02-02 13:57:15.22575 |
352 |
70428904 |
Creation of drainage channel for management of grey water |
301911 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.724934964440763
Longitude : 89.25251126289368
file name : Image_10012024133250274.png
|
2024-01-10 13:32:50.374081 |
353 |
70428904 |
Creation of drainage channel for management of grey water |
301911 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.72482361085713
Longitude : 89.25238469615579
file name : Image_12122023133536854.png
|
2023-12-12 13:35:36.984348 |
354 |
34837257 |
CC road from ZP road to Rajesh Sharma house |
132698 |
CC road from ZP road to Rajesh Sharma house 1 |
Roof laid |
-
latitude : 26.704695601947606,26.70473218895495
Longitude : 89.27200907841325,89.27164622582495
file name : Image_16072021161354640.png
|
2021-07-16 16:13:54.73836 |
355 |
34837257 |
CC road from ZP road to Rajesh Sharma house |
132698 |
CC road from ZP road to Rajesh Sharma house 1 |
Plinth level |
-
latitude : 26.70467510819435,26.704726656898856
Longitude : 89.27202424965799,89.27163189277053
file name : Image_16072021161003116.png
|
2021-07-16 16:10:03.202837 |
356 |
34837257 |
CC road from ZP road to Rajesh Sharma house |
132698 |
CC road from ZP road to Rajesh Sharma house 1 |
Plinth level |
-
latitude : 26.70475301798433,26.704686381854117
Longitude : 89.27161362022161,89.27198627963662
file name : Image_16072021160946424.png
|
2021-07-16 16:09:46.501374 |
357 |
34837257 |
CC road from ZP road to Rajesh Sharma house |
132698 |
CC road from ZP road to Rajesh Sharma house 1 |
Completion of work |
-
latitude : 26.707734963856637,26.704667857848108
Longitude : 89.2805162910372,89.27178947255015
file name : Image_22062021143108322.png
|
2021-06-22 14:31:08.425592 |
358 |
39111861 |
Sinking of Hand Pump tubewell with recharge pit near Sadan Turi house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Sadan Turi house at Uttar Chhekamari1 |
Roof laid |
-
latitude : 26.70523007400334
Longitude : 89.26213142462075
file name : Image_25062021135721778.png
|
2021-06-25 13:57:21.895643 |
359 |
39111861 |
Sinking of Hand Pump tubewell with recharge pit near Sadan Turi house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Sadan Turi house at Uttar Chhekamari1 |
Plinth level |
-
latitude : 26.705293566919863
Longitude : 89.26213938742876
file name : Image_25062021135152989.png
|
2021-06-25 13:51:53.09889 |
360 |
39111861 |
Sinking of Hand Pump tubewell with recharge pit near Sadan Turi house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Sadan Turi house at Uttar Chhekamari1 |
Completion of work |
-
latitude : 26.705189128406346
Longitude : 89.26225799135864
file name : Image_05062021143808662.png
|
2021-06-05 14:38:08.763956 |
361 |
34718920 |
Hand pump with recharge pit at Meghnath Saha Nagar SSK at MNS Nagar |
30744 |
Hand pump with recharge pit at Meghnath Saha Nagar SSK at MNS Nagar1 |
Roof laid |
-
latitude : 26.708158417604864
Longitude : 89.28202595561743
file name : Image_25062021144654340.png
|
2021-06-25 14:46:54.444982 |
362 |
34718920 |
Hand pump with recharge pit at Meghnath Saha Nagar SSK at MNS Nagar |
30744 |
Hand pump with recharge pit at Meghnath Saha Nagar SSK at MNS Nagar1 |
Plinth level |
-
latitude : 26.708142408169806
Longitude : 89.2820013128221
file name : Image_25062021144027268.png
|
2021-06-25 14:40:27.357378 |
363 |
34718920 |
Hand pump with recharge pit at Meghnath Saha Nagar SSK at MNS Nagar |
30744 |
Hand pump with recharge pit at Meghnath Saha Nagar SSK at MNS Nagar1 |
Plinth level |
-
latitude : 26.708142408169806
Longitude : 89.2820013128221
file name : Image_25062021144244269.png
|
2021-06-25 14:42:44.37996 |
364 |
34718920 |
Hand pump with recharge pit at Meghnath Saha Nagar SSK at MNS Nagar |
30744 |
Hand pump with recharge pit at Meghnath Saha Nagar SSK at MNS Nagar1 |
Completion of work |
-
latitude : 26.70813184697181
Longitude : 89.2820034082979
file name : Image_25062021143623387.png
|
2021-06-25 14:36:23.485545 |
365 |
34718920 |
Hand pump with recharge pit at Meghnath Saha Nagar SSK at MNS Nagar |
30744 |
Hand pump with recharge pit at Meghnath Saha Nagar SSK at MNS Nagar1 |
Completion of work |
-
latitude : 26.708126859739423
Longitude : 89.28200617432594
file name : Image_22062021150915062.png
|
2021-06-22 15:09:15.145256 |
366 |
34718063 |
Hand Pump tubewell with recharge pit near ICDS centre no Sixty one at MNS Nagar |
30744 |
Hand Pump tubewell with recharge pit near ICDS centre no Sixty one at MNS Nagar1 |
Roof laid |
-
latitude : 26.700304951518774
Longitude : 89.02895492501557
file name : Image_25062021131938335.png
|
2021-06-25 13:19:38.432812 |
367 |
34718063 |
Hand Pump tubewell with recharge pit near ICDS centre no Sixty one at MNS Nagar |
30744 |
Hand Pump tubewell with recharge pit near ICDS centre no Sixty one at MNS Nagar1 |
Plinth level |
-
latitude : 26.706560575403273
Longitude : 89.27139895968139
file name : Image_22062021154055710.png
|
2021-06-22 15:40:55.825254 |
368 |
34718063 |
Hand Pump tubewell with recharge pit near ICDS centre no Sixty one at MNS Nagar |
30744 |
Hand Pump tubewell with recharge pit near ICDS centre no Sixty one at MNS Nagar1 |
Completion of work |
-
latitude : 26.706561245955527
Longitude : 89.27137213759124
file name : Image_22062021153251924.png
|
2021-06-22 15:32:52.041519 |
369 |
34898209 |
Four no prymary school ground with sitting arrangement for the old age person |
89453 |
Four no prymary school ground with sitting arrangement for the old age person 1 |
Completion of work |
-
latitude : 26.7052751
Longitude : 89.2806907
file name : Image_16082021155056275.png
|
2021-08-16 15:50:56.425656 |
370 |
34898209 |
Four no prymary school ground with sitting arrangement for the old age person |
89453 |
Four no prymary school ground with sitting arrangement for the old age person 1 |
Completion of work |
-
latitude : 26.7055634
Longitude : 89.2794907
file name : Image_28072021130904775.png
|
2021-07-28 13:09:04.875422 |
371 |
34898209 |
Four no prymary school ground with sitting arrangement for the old age person |
89453 |
Four no prymary school ground with sitting arrangement for the old age person 1 |
Completion of work |
-
latitude : 26.7052985
Longitude : 89.2805985
file name : Image_22062021125541410.png
|
2021-06-22 12:55:41.517785 |
372 |
34893696 |
CC road from Babita Chhetri house to Somra Oraon land |
349214 |
CC road from Babita Chhetri house to Somra Oraon land 1 |
Roof laid |
-
latitude : 26.721203257329762,26.728916787542403
Longitude : 89.27810356020927,89.28641178645194
file name : Image_20032021160039447.png
|
2021-03-20 16:00:40.145391 |
373 |
34893696 |
CC road from Babita Chhetri house to Somra Oraon land |
349214 |
CC road from Babita Chhetri house to Somra Oraon land 1 |
Plinth level |
-
latitude : 26.727712894789875,26.72771293669939
Longitude : 89.28612956777215,89.28612973541021
file name : Image_12032021161156038.png
|
2021-03-12 16:11:56.130886 |
374 |
34893696 |
CC road from Babita Chhetri house to Somra Oraon land |
349214 |
CC road from Babita Chhetri house to Somra Oraon land 1 |
Completion of work |
-
latitude : 26.7289125546813,26.727800108492374
Longitude : 89.28645520471036,89.286123868078
file name : Image_14012021143138640.png
|
2021-01-14 14:31:38.755655 |
375 |
34890424 |
Culvert near Bandhan Oraon house |
196257 |
Culvert near Bandhan Oraon house 1 |
Roof laid |
-
latitude : 26.724029215984046
Longitude : 89.28836736828089
file name : Image_02072021140623948.png
|
2021-07-02 14:06:24.036366 |
376 |
34890424 |
Culvert near Bandhan Oraon house |
196257 |
Culvert near Bandhan Oraon house 1 |
Plinth level |
-
latitude : 26.72399862203747
Longitude : 89.28835110738873
file name : Image_08062021160214948.png
|
2021-06-08 16:02:15.029442 |
377 |
34890424 |
Culvert near Bandhan Oraon house |
196257 |
Culvert near Bandhan Oraon house 1 |
Completion of work |
-
latitude : 26.72396421432495
Longitude : 89.28842017427087
file name : Image_31052021133505442.png
|
2021-05-31 13:35:05.54454 |
378 |
34910479 |
Office premises with precast pavers block at Madarihat Gram Panchayat office |
348249 |
Office premises with precast pavers block at Madarihat Gram Panchayat office1 |
Roof laid |
-
latitude : 26.7078078
Longitude : 89.2805441
file name : Image_12032021161223297.png
|
2021-03-12 16:12:23.394468 |
379 |
34910479 |
Office premises with precast pavers block at Madarihat Gram Panchayat office |
348249 |
Office premises with precast pavers block at Madarihat Gram Panchayat office1 |
Plinth level |
-
latitude : 26.7078137
Longitude : 89.2805066
file name : Image_05032021131108269.png
|
2021-03-05 13:11:08.362475 |
380 |
34910479 |
Office premises with precast pavers block at Madarihat Gram Panchayat office |
348249 |
Office premises with precast pavers block at Madarihat Gram Panchayat office1 |
Completion of work |
-
latitude : 26.7057599
Longitude : 89.2806018
file name : Image_10022021123534006.png
|
2021-02-10 12:35:34.11006 |
381 |
34839998 |
CC road from Rabin Karjee house to Satri Munda |
349214 |
CC road from Rabin Karjee house to Satri Munda 1 |
Roof laid |
-
latitude : 26.714306082576513,26.71313986647874
Longitude : 89.25770938396454,89.25760519690812
file name : Image_01022021151845316.png
|
2021-02-01 15:18:45.409065 |
382 |
34839998 |
CC road from Rabin Karjee house to Satri Munda |
349214 |
CC road from Rabin Karjee house to Satri Munda 1 |
Plinth level |
-
latitude : 26.713143847882748,26.71361763495952
Longitude : 89.25759807229042,89.25782974809408
file name : Image_01022021151146121.png
|
2021-02-01 15:11:46.207665 |
383 |
34839998 |
CC road from Rabin Karjee house to Satri Munda |
349214 |
CC road from Rabin Karjee house to Satri Munda 1 |
Completion of work |
-
latitude : 26.713203066028655,26.71425025910139
Longitude : 89.2575937975198,89.25774634815753
file name : Image_08012021145209428.png
|
2021-01-08 14:52:09.549863 |
384 |
34947349 |
CC road from Harka Bd Lama to Lalita Sharma |
290730 |
CC road from Harka Bd Lama to Lalita Sharma1 |
Roof laid |
-
latitude : 26.696921554394066,26.69606609735638
Longitude : 89.2626799363643,89.26255605183542
file name : Image_24032021134341232.png
|
2021-03-24 13:43:41.340839 |
385 |
34947349 |
CC road from Harka Bd Lama to Lalita Sharma |
290730 |
CC road from Harka Bd Lama to Lalita Sharma1 |
Plinth level |
-
latitude : 26.696905167773366,26.696001598611474
Longitude : 89.26266124472022,89.2625414673239
file name : Image_18032021115313313.png
|
2021-03-18 11:53:13.065694 |
386 |
34947349 |
CC road from Harka Bd Lama to Lalita Sharma |
290730 |
CC road from Harka Bd Lama to Lalita Sharma1 |
Completion of work |
-
latitude : 26.715205083601177,26.696930481120944
Longitude : 89.26436972804368,89.26269896328449
file name : Image_03022021120436720.png
|
2021-02-03 12:04:36.807682 |
387 |
34834628 |
CC road from Shyamal Das house to Etowa Mahali house at Bangabari |
349214 |
CC road from Shyamal Das house to Etowa Mahali house at Bangabari1 |
Roof laid |
-
latitude : 26.721533252857625,26.72157750930637,26.721572228707373
Longitude : 89.24068833701313,89.24067987129092,89.24065765924752
file name : Image_13022021121118514.png
|
2021-02-13 12:11:18.624148 |
388 |
34834628 |
CC road from Shyamal Das house to Etowa Mahali house at Bangabari |
349214 |
CC road from Shyamal Das house to Etowa Mahali house at Bangabari1 |
Roof laid |
-
latitude : 26.721556303091347,26.721544861793518
Longitude : 89.24067123793066,89.23929308541119
file name : Image_10022021112521960.png
|
2021-02-10 11:25:22.058226 |
389 |
34834628 |
CC road from Shyamal Das house to Etowa Mahali house at Bangabari |
349214 |
CC road from Shyamal Das house to Etowa Mahali house at Bangabari1 |
Plinth level |
-
latitude : 26.72156812157482,26.721544610336423
Longitude : 89.23921287059784,89.24068263731897
file name : Image_09022021123013406.png
|
2021-02-09 12:30:13.532103 |
390 |
34834628 |
CC road from Shyamal Das house to Etowa Mahali house at Bangabari |
349214 |
CC road from Shyamal Das house to Etowa Mahali house at Bangabari1 |
Completion of work |
-
latitude : 26.721566319465637,26.721535515971482
Longitude : 89.23928000964224,89.24080291762948
file name : Image_15012021143940074.png
|
2021-01-15 14:39:40.171134 |
391 |
34946491 |
Shed in front of Madarihat Gram Panchayat HQ PHC |
348158 |
Shed in front of Madarihat Gram Panchayat HQ PHC1 |
Roof laid |
-
latitude : 26.707547502592206
Longitude : 89.28062131628394
file name : Image_17032021124008675.png
|
2021-03-17 12:40:08.788081 |
392 |
34946491 |
Shed in front of Madarihat Gram Panchayat HQ PHC |
348158 |
Shed in front of Madarihat Gram Panchayat HQ PHC1 |
Roof laid |
-
latitude : 26.7078086
Longitude : 89.2805131
file name : Image_12032021161230742.png
|
2021-03-12 16:12:30.83181 |
393 |
34946491 |
Shed in front of Madarihat Gram Panchayat HQ PHC |
348158 |
Shed in front of Madarihat Gram Panchayat HQ PHC1 |
Plinth level |
-
latitude : 26.7078081
Longitude : 89.2805355
file name : Image_05032021130810258.png
|
2021-03-05 13:08:10.34433 |
394 |
34946491 |
Shed in front of Madarihat Gram Panchayat HQ PHC |
348158 |
Shed in front of Madarihat Gram Panchayat HQ PHC1 |
Completion of work |
-
latitude : 26.7078691
Longitude : 89.2803561
file name : Image_15012021143945540.png
|
2021-01-15 14:39:45.646855 |
395 |
34838442 |
Road with pavers block from Narayan Karmakar shop to Indrajit Das house |
308095 |
Road with pavers block from Narayan Karmakar shop to Indrajit Das house1 |
Completion of work |
-
latitude : 26.6885291,26.6885382
Longitude : 89.2783824,89.2784084
file name : Image_12032021161212338.png
|
2021-03-12 16:12:12.424554 |
396 |
34838442 |
Road with pavers block from Narayan Karmakar shop to Indrajit Das house |
308095 |
Road with pavers block from Narayan Karmakar shop to Indrajit Das house1 |
Completion of work |
-
latitude : 26.6885713,26.6885701
Longitude : 89.2783894,89.2783791
file name : Image_28012021152341400.png
|
2021-01-28 15:23:41.494068 |
397 |
34838212 |
CC road from Alok Bhattacharjee house to Mithu Das house |
169895 |
CC road from Alok Bhattacharjee house to Mithu Das house 1 |
Roof laid |
-
latitude : 26.6903457,26.6898265
Longitude : 89.2745315,89.276145
file name : Image_02072021120327013.png
|
2021-07-02 12:03:27.15358 |
398 |
34838212 |
CC road from Alok Bhattacharjee house to Mithu Das house |
169895 |
CC road from Alok Bhattacharjee house to Mithu Das house 1 |
Plinth level |
-
latitude : 26.6903481,26.69019117951393
Longitude : 89.2745685,89.27542470395565
file name : Image_28062021114457338.png
|
2021-06-28 11:44:57.444406 |
399 |
34838212 |
CC road from Alok Bhattacharjee house to Mithu Das house |
169895 |
CC road from Alok Bhattacharjee house to Mithu Das house 1 |
Completion of work |
-
latitude : 26.6898025,26.6903525730595
Longitude : 89.2761621,89.2750268150121
file name : Image_10022021112541224.png
|
2021-02-10 11:25:41.322254 |
400 |
34839858 |
CC road from Afaz Ali shop to Mosaref Hossain house |
348858 |
CC road from Afaz Ali shop to Mosaref Hossain house1 |
Roof laid |
-
latitude : 26.722685722634196,26.722358744591475
Longitude : 89.26823143847287,89.2694987822324
file name : Image_24032021155207904.png
|
2021-03-24 15:52:08.008501 |
401 |
34839858 |
CC road from Afaz Ali shop to Mosaref Hossain house |
348858 |
CC road from Afaz Ali shop to Mosaref Hossain house1 |
Plinth level |
-
latitude : 26.722675622440875,26.722356104291975
Longitude : 89.26821542903781,89.2694371752441
file name : Image_20032021162508299.png
|
2021-03-20 16:25:08.809961 |
402 |
34839858 |
CC road from Afaz Ali shop to Mosaref Hossain house |
348858 |
CC road from Afaz Ali shop to Mosaref Hossain house1 |
Completion of work |
-
latitude : 26.72265412285924,26.722366497851908
Longitude : 89.26833420060575,89.26945058628917
file name : Image_11022021173246919.png
|
2021-02-11 17:32:47.035558 |
403 |
39112235 |
Sinking of Hand Pump tubewell with recharge pit near Tohidul Haque house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Tohidul Haque house at Uttar Chhekamari1 |
Roof laid |
-
latitude : 26.70686525758356
Longitude : 89.25300872884691
file name : Image_25062021133931476.png
|
2021-06-25 13:39:31.579352 |
404 |
39112235 |
Sinking of Hand Pump tubewell with recharge pit near Tohidul Haque house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Tohidul Haque house at Uttar Chhekamari1 |
Plinth level |
-
latitude : 26.706893420778215
Longitude : 89.25310805439949
file name : Image_05062021141158943.png
|
2021-06-05 14:11:59.02922 |
405 |
39112235 |
Sinking of Hand Pump tubewell with recharge pit near Tohidul Haque house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Tohidul Haque house at Uttar Chhekamari1 |
Completion of work |
-
latitude : 26.706909094937146
Longitude : 89.25307461060584
file name : Image_05062021140733094.png
|
2021-06-05 14:07:33.178385 |
406 |
39112251 |
Sinking of Hand Pump tubewell with recharge pit near Phagu Oraon house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Phagu Oraon house at Uttar Chhekamari1 |
Roof laid |
-
latitude : 26.71256340108812
Longitude : 89.26119223237038
file name : Image_25062021133442168.png
|
2021-06-25 13:34:42.281665 |
407 |
39112251 |
Sinking of Hand Pump tubewell with recharge pit near Phagu Oraon house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Phagu Oraon house at Uttar Chhekamari1 |
Plinth level |
-
latitude : 26.71253284905106
Longitude : 89.26117605529726
file name : Image_25062021133110438.png
|
2021-06-25 13:31:10.540979 |
408 |
39112251 |
Sinking of Hand Pump tubewell with recharge pit near Phagu Oraon house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Phagu Oraon house at Uttar Chhekamari1 |
Completion of work |
-
latitude : 26.71256884932518
Longitude : 89.26112811081111
file name : Image_05062021142910130.png
|
2021-06-05 14:29:10.228697 |
409 |
39112356 |
Sinking of Hand Pump tubewell with recharge pit near Bandhan Oraon house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Bandhan Oraon house at Uttar Chhekamari1 |
Roof laid |
-
latitude : 26.700387974269688
Longitude : 89.26786699332297
file name : Image_25062021142042738.png
|
2021-06-25 14:20:42.830604 |
410 |
39112356 |
Sinking of Hand Pump tubewell with recharge pit near Bandhan Oraon house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Bandhan Oraon house at Uttar Chhekamari1 |
Plinth level |
-
latitude : 26.700415299274027
Longitude : 89.26788417622447
file name : Image_25062021141804570.png
|
2021-06-25 14:18:04.676816 |
411 |
39112356 |
Sinking of Hand Pump tubewell with recharge pit near Bandhan Oraon house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Bandhan Oraon house at Uttar Chhekamari1 |
Completion of work |
-
latitude : 26.70040972530842
Longitude : 89.26788317039609
file name : Image_25062021141514167.png
|
2021-06-25 14:15:14.27258 |
412 |
39112327 |
Sinking of Hand Pump tubewell with recharge pit near Ramesh Oraon house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Ramesh Oraon house at Uttar Chhekamari1 |
Roof laid |
-
latitude : 26.70252820942551
Longitude : 89.26111419685185
file name : Image_22062021155137862.png
|
2021-06-22 15:51:37.959647 |
413 |
39112327 |
Sinking of Hand Pump tubewell with recharge pit near Ramesh Oraon house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Ramesh Oraon house at Uttar Chhekamari1 |
Plinth level |
-
latitude : 26.70252992771566
Longitude : 89.26110749132931
file name : Image_22062021154711044.png
|
2021-06-22 15:47:11.148736 |
414 |
39112327 |
Sinking of Hand Pump tubewell with recharge pit near Ramesh Oraon house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Ramesh Oraon house at Uttar Chhekamari1 |
Completion of work |
-
latitude : 26.70261106453836
Longitude : 89.26108008250594
file name : Image_05062021131645470.png
|
2021-06-05 13:16:45.566755 |
415 |
39112221 |
Sinking of Hand Pump tubewell with recharge pit near Amrul Hoque house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Amrul Hoque house at Uttar Chhekamari1 |
Roof laid |
-
latitude : 26.70981518458575
Longitude : 89.24915883690119
file name : Image_25062021134321352.png
|
2021-06-25 13:43:21.482147 |
416 |
39112221 |
Sinking of Hand Pump tubewell with recharge pit near Amrul Hoque house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Amrul Hoque house at Uttar Chhekamari1 |
Plinth level |
-
latitude : 26.709902021102607
Longitude : 89.24906814470887
file name : Image_22062021164209251.png
|
2021-06-22 16:42:09.351847 |
417 |
39112221 |
Sinking of Hand Pump tubewell with recharge pit near Amrul Hoque house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Amrul Hoque house at Uttar Chhekamari1 |
Completion of work |
-
latitude : 26.70988194644451
Longitude : 89.24903738312423
file name : Image_22062021161601383.png
|
2021-06-22 16:16:01.468572 |
418 |
39112221 |
Sinking of Hand Pump tubewell with recharge pit near Amrul Hoque house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Amrul Hoque house at Uttar Chhekamari1 |
Completion of work |
-
latitude : 26.709897369146347
Longitude : 89.24902321770787
file name : Image_05062021142307563.png
|
2021-06-05 14:23:07.639354 |
419 |
39112221 |
Sinking of Hand Pump tubewell with recharge pit near Amrul Hoque house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Amrul Hoque house at Uttar Chhekamari1 |
Completion of work |
-
latitude : 26.709897369146347
Longitude : 89.24902321770787
file name : Image_05062021142011405.png
|
2021-06-05 14:20:11.498319 |
420 |
39112275 |
Sinking of Hand Pump tubewell with recharge pit near Maya Saiba house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Maya Saiba house at Uttar Chhekamari1 |
Roof laid |
-
latitude : 26.700577279552817
Longitude : 89.26026619970798
file name : Image_25062021140116958.png
|
2021-06-25 14:01:17.059201 |
421 |
39112275 |
Sinking of Hand Pump tubewell with recharge pit near Maya Saiba house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Maya Saiba house at Uttar Chhekamari1 |
Plinth level |
-
latitude : 26.700536040589213
Longitude : 89.26024717278779
file name : Image_05062021132912562.png
|
2021-06-05 13:29:12.666051 |
422 |
39112275 |
Sinking of Hand Pump tubewell with recharge pit near Maya Saiba house at Uttar Chhekamari |
30744 |
Sinking of Hand Pump tubewell with recharge pit near Maya Saiba house at Uttar Chhekamari1 |
Completion of work |
-
latitude : 26.70059789903462
Longitude : 89.2602633498609
file name : Image_05062021132401185.png
|
2021-06-05 13:24:01.290437 |
423 |
34919667 |
Highmast solar light near Bimal Oraon house at Purba Khairbari |
349879 |
Highmast solar light near Bimal Oraon house at Purba Khairbari 1 |
Roof laid |
-
latitude : 26.71626971103251
Longitude : 89.28279541432858
file name : Image_22062021165541385.png
|
2021-06-22 16:55:41.508898 |
424 |
34919667 |
Highmast solar light near Bimal Oraon house at Purba Khairbari |
349879 |
Highmast solar light near Bimal Oraon house at Purba Khairbari 1 |
Plinth level |
-
latitude : 26.716227801516652
Longitude : 89.28277110680938
file name : Image_22062021165230120.png
|
2021-06-22 16:52:30.248015 |
425 |
34892902 |
Culvert near the house of Lalita Sharma |
175857 |
Culvert near the house of Lalita Sharma 1 |
Roof laid |
-
latitude : 26.725754463113844
Longitude : 89.27931868471205
file name : Image_28062022144933040.png
|
2022-06-28 14:49:33.143651 |
426 |
34892902 |
Culvert near the house of Lalita Sharma |
175857 |
Culvert near the house of Lalita Sharma 1 |
Plinth level |
-
latitude : 26.725779441185296
Longitude : 89.27920402027667
file name : Image_28062022144336321.png
|
2022-06-28 14:43:36.434871 |
427 |
34892902 |
Culvert near the house of Lalita Sharma |
175857 |
Culvert near the house of Lalita Sharma 1 |
Completion of work |
-
latitude : 26.725713768973947
Longitude : 89.27930091507733
file name : Image_28062022143650864.png
|
2022-06-28 14:36:50.96731 |
428 |
34907295 |
Drain cleaning along with garbage disposal throughout the year |
212971 |
Drain cleaning along with garbage disposal throughout the year 1 |
Plinth level |
-
latitude : 26.69094856828451,26.690975222736597
Longitude : 89.27580851130188,89.2758381832391
file name : Image_15062022091432124.png
|
2022-06-15 09:14:32.215755 |
429 |
34907295 |
Drain cleaning along with garbage disposal throughout the year |
212971 |
Drain cleaning along with garbage disposal throughout the year 1 |
Completion of work |
-
latitude : 26.690951460041106,26.6912966
Longitude : 89.27578009665012,89.2749703
file name : Image_15062022083101397.png
|
2022-06-15 08:31:01.481655 |
430 |
34945690 |
Slab over the drain at Madarihat Bazar of Uttar Madarihat |
187938 |
Slab over the drain at Madarihat Bazar of Uttar Madarihat 1 |
Roof laid |
-
latitude : 26.693691,26.6938156,26.6926367,26.694517247378826,26.6944836
Longitude : 89.2809685,89.2811429,89.2804545,89.28062106482685,89.2811732
file name : Image_21092021134259560.png
|
2021-09-21 13:42:59.65777 |
431 |
34945690 |
Slab over the drain at Madarihat Bazar of Uttar Madarihat |
187938 |
Slab over the drain at Madarihat Bazar of Uttar Madarihat 1 |
Plinth level |
-
latitude : 26.6936243,26.6940162
Longitude : 89.2808932,89.2804834
file name : Image_21092021133455810.png
|
2021-09-21 13:34:55.908651 |
432 |
34945690 |
Slab over the drain at Madarihat Bazar of Uttar Madarihat |
187938 |
Slab over the drain at Madarihat Bazar of Uttar Madarihat 1 |
Completion of work |
-
latitude : 26.693936088122427,26.6936196
Longitude : 89.28072148002684,89.2808394
file name : Image_21092021132853664.png
|
2021-09-21 13:28:53.752413 |
433 |
47208698 |
Construction of CC Drain from Sanu Rana house to Culvert at Purba |
345793 |
Construction of CC Drain from Sanu Rana house to Culvert at Purba 1 |
Plinth level |
-
latitude : 26.717547196894884,26.717168376781046
Longitude : 89.28429694846272,89.28590660914779
file name : Image_10052022153146233.png
|
2022-05-10 15:31:46.356241 |
434 |
47208698 |
Construction of CC Drain from Sanu Rana house to Culvert at Purba |
345793 |
Construction of CC Drain from Sanu Rana house to Culvert at Purba 1 |
Completion of work |
-
latitude : 26.717533827759326,26.717533827759326,26.71722227241844,26.71723543200642
Longitude : 89.28452091291547,89.28452091291547,89.2859299108386,89.2859058547765
file name : Image_26022022120823009.png
|
2022-02-26 12:08:23.123697 |
435 |
46896565 |
Construction of Paver Block Road from Hamid Ali house to Mithun Biswas house |
331436 |
Construction of Paver Block Road from Hamid Ali house to Mithun Biswas house1 |
Roof laid |
-
latitude : 26.69581526890397,26.6971474
Longitude : 89.27663253620267,89.2767882
file name : Image_20042022123006173.png
|
2022-04-20 12:30:06.284717 |
436 |
46896565 |
Construction of Paver Block Road from Hamid Ali house to Mithun Biswas house |
331436 |
Construction of Paver Block Road from Hamid Ali house to Mithun Biswas house1 |
Plinth level |
-
latitude : 26.696272501721978,26.69580474961549
Longitude : 89.27681274712086,89.27660596556962
file name : Image_20042022122201811.png
|
2022-04-20 12:22:01.915721 |
437 |
46896565 |
Construction of Paver Block Road from Hamid Ali house to Mithun Biswas house |
331436 |
Construction of Paver Block Road from Hamid Ali house to Mithun Biswas house1 |
Completion of work |
-
latitude : 26.695957803167403,26.695938524790108
Longitude : 89.27665156312287,89.27671643905342
file name : Image_02032022172342913.png
|
2022-03-02 17:23:43.014682 |
438 |
46909257 |
Construction of CC Road from ZP road to Mahabul Alam house |
310535 |
Construction of CC Road from ZP road to Mahabul Alam house1 |
Plinth level |
-
latitude : 26.7254567,26.725039989687502
Longitude : 89.2700928,89.27094390615821
file name : Image_10052022153141997.png
|
2022-05-10 15:31:42.116512 |
439 |
46909257 |
Construction of CC Road from ZP road to Mahabul Alam house |
310535 |
Construction of CC Road from ZP road to Mahabul Alam house1 |
Plinth level |
-
latitude : 26.725060399621725,26.725052185356617
Longitude : 89.27101381123066,89.27101096138358
file name : Image_10052022121242595.png
|
2022-05-10 12:12:42.700306 |
440 |
46909257 |
Construction of CC Road from ZP road to Mahabul Alam house |
310535 |
Construction of CC Road from ZP road to Mahabul Alam house1 |
Completion of work |
-
latitude : 26.72558330465108,26.7252852441743
Longitude : 89.26985912024975,89.27043898031116
file name : Image_08042022115540828.png
|
2022-04-08 11:55:40.95618 |
441 |
46909257 |
Construction of CC Road from ZP road to Mahabul Alam house |
310535 |
Construction of CC Road from ZP road to Mahabul Alam house1 |
Completion of work |
-
latitude : 26.725091538392007,26.7255276
Longitude : 89.27090484648943,89.270134
file name : Image_08042022115545617.png
|
2022-04-08 11:55:45.73098 |
442 |
46909257 |
Construction of CC Road from ZP road to Mahabul Alam house |
310535 |
Construction of CC Road from ZP road to Mahabul Alam house1 |
Completion of work |
-
latitude : 26.724243750795722,26.724280882626772,26.724308794364333,26.724308794364333
Longitude : 89.26704372279346,89.2671381868422,89.26713324151933,89.26713324151933
file name : Image_26022022121325515.png
|
2022-02-26 12:13:25.615163 |
443 |
47208888 |
Construction of CC Drain with Slab Culvert near house of Mikin Lama at Uttar Khairbari |
242711 |
Construction of CC Drain with Slab Culvert near house of Mikin Lama at Uttar Khairbari1 |
Roof laid |
-
latitude : 26.728309895843267,26.72899440396577
Longitude : 89.27550081163645,89.27477460354567
file name : Image_25042022122121363.png
|
2022-04-25 12:21:21.492785 |
444 |
47208888 |
Construction of CC Drain with Slab Culvert near house of Mikin Lama at Uttar Khairbari |
242711 |
Construction of CC Drain with Slab Culvert near house of Mikin Lama at Uttar Khairbari1 |
Plinth level |
-
latitude : 26.729024788364768,26.72829652670771
Longitude : 89.27485004067421,89.27545848302543
file name : Image_25042022120640905.png
|
2022-04-25 12:06:41.036568 |
445 |
47208888 |
Construction of CC Drain with Slab Culvert near house of Mikin Lama at Uttar Khairbari |
242711 |
Construction of CC Drain with Slab Culvert near house of Mikin Lama at Uttar Khairbari1 |
Completion of work |
-
latitude : 26.728334077633917,26.7301513
Longitude : 89.27547549828887,89.273784
file name : Image_04032022135314551.png
|
2022-03-04 13:53:14.679806 |
446 |
47099175 |
Construction of drain with slab from Pawan Kanti house to Panchanan Sarkar house at Aswini Nagar -1 |
345759 |
Construction of drain with slab from Pawan Kanti house to Panchanan Sarkar house at Aswini Nagar -1 1 |
Roof laid |
-
latitude : 26.6923661,26.6922196
Longitude : 89.2721881,89.2711845
file name : Image_19052022125605126.png
|
2022-05-19 12:56:05.244763 |
447 |
47099175 |
Construction of drain with slab from Pawan Kanti house to Panchanan Sarkar house at Aswini Nagar -1 |
345759 |
Construction of drain with slab from Pawan Kanti house to Panchanan Sarkar house at Aswini Nagar -1 1 |
Plinth level |
-
latitude : 26.6923559,26.6921278
Longitude : 89.2720908,89.2711139
file name : Image_19052022090734828.png
|
2022-05-19 09:07:34.933249 |
448 |
47099175 |
Construction of drain with slab from Pawan Kanti house to Panchanan Sarkar house at Aswini Nagar -1 |
345759 |
Construction of drain with slab from Pawan Kanti house to Panchanan Sarkar house at Aswini Nagar -1 1 |
Completion of work |
-
latitude : 26.6922836,26.6921351
Longitude : 89.2712343,89.2711264
file name : Image_18052022172707858.png
|
2022-05-18 17:27:07.980314 |
449 |
47099175 |
Construction of drain with slab from Pawan Kanti house to Panchanan Sarkar house at Aswini Nagar -1 |
345759 |
Construction of drain with slab from Pawan Kanti house to Panchanan Sarkar house at Aswini Nagar -1 1 |
Completion of work |
-
latitude : 26.6920959,26.6921256
Longitude : 89.2711089,89.2710907
file name : Image_21032022164553110.png
|
2022-03-21 16:45:53.208329 |
450 |
47099175 |
Construction of drain with slab from Pawan Kanti house to Panchanan Sarkar house at Aswini Nagar -1 |
345759 |
Construction of drain with slab from Pawan Kanti house to Panchanan Sarkar house at Aswini Nagar -1 1 |
Completion of work |
-
latitude : 26.6921263,26.6921263
Longitude : 89.2710981,89.2710981
file name : Image_02032022170037189.png
|
2022-03-02 17:00:37.301336 |
451 |
47209725 |
Installation of Rigbore tubewell at 5no Line SSK at Bangabari |
280535 |
Installation of Rigbore tubewell at 5no Line SSK at Bangabari1 |
Roof laid |
-
latitude : 26.722074639983475
Longitude : 89.2412834521383
file name : Image_13092022130252011.png
|
2022-09-13 13:02:52.12458 |
452 |
47209725 |
Installation of Rigbore tubewell at 5no Line SSK at Bangabari |
280535 |
Installation of Rigbore tubewell at 5no Line SSK at Bangabari1 |
Plinth level |
-
latitude : 26.7221148731187
Longitude : 89.24129778519273
file name : Image_13092022125338813.png
|
2022-09-13 12:53:39.01344 |
453 |
47209725 |
Installation of Rigbore tubewell at 5no Line SSK at Bangabari |
280535 |
Installation of Rigbore tubewell at 5no Line SSK at Bangabari1 |
Completion of work |
-
latitude : 26.722002513706684
Longitude : 89.24134204164147
file name : Image_07092022143105671.png
|
2022-09-07 14:31:05.790028 |
454 |
47102438 |
Construction of CC Drain from Totopara road to Jagadish Poudel house at MNS Nagar at Sansad X |
237288 |
Construction of CC Drain from Totopara road to Jagadish Poudel house at MNS Nagar at Sansad X1 |
Roof laid |
-
latitude : 26.713074,26.7117136
Longitude : 89.2798354,89.2797199
file name : Image_25042022143158456.png
|
2022-04-25 14:31:58.5708 |
455 |
47102438 |
Construction of CC Drain from Totopara road to Jagadish Poudel house at MNS Nagar at Sansad X |
237288 |
Construction of CC Drain from Totopara road to Jagadish Poudel house at MNS Nagar at Sansad X1 |
Plinth level |
-
latitude : 26.7129053,26.7130897
Longitude : 89.2797501,89.2797072
file name : Image_25042022142418985.png
|
2022-04-25 14:24:19.117648 |
456 |
47102438 |
Construction of CC Drain from Totopara road to Jagadish Poudel house at MNS Nagar at Sansad X |
237288 |
Construction of CC Drain from Totopara road to Jagadish Poudel house at MNS Nagar at Sansad X1 |
Completion of work |
-
latitude : 26.71289,26.7123045
Longitude : 89.2796359,89.2795511
file name : Image_21032022165442078.png
|
2022-03-21 16:54:42.193399 |
457 |
47098636 |
Construction of CC Drain from Narayan Sharma house to Gangu Naik at Sansad II |
195540 |
Construction of CC Drain from Narayan Sharma house to Gangu Naik at Sansad II1 |
Roof laid |
-
latitude : 26.721726413816214,26.720912782475352
Longitude : 89.23597301356494,89.23610083758831
file name : Image_28112022123210425.png
|
2022-11-28 12:32:10.525138 |
458 |
47098636 |
Construction of CC Drain from Narayan Sharma house to Gangu Naik at Sansad II |
195540 |
Construction of CC Drain from Narayan Sharma house to Gangu Naik at Sansad II1 |
Plinth level |
-
latitude : 26.72081081662327,26.72170420177281
Longitude : 89.23615020699799,89.23600587062538
file name : Image_28112022121351961.png
|
2022-11-28 12:13:52.086937 |
459 |
47098636 |
Construction of CC Drain from Narayan Sharma house to Gangu Naik at Sansad II |
195540 |
Construction of CC Drain from Narayan Sharma house to Gangu Naik at Sansad II1 |
Completion of work |
-
latitude : 26.7209578352049,26.721057118847966
Longitude : 89.23608457669616,89.2360130790621
file name : Image_29052022171048931.png
|
2022-05-29 17:10:49.02137 |
460 |
47103765 |
Construction of CC Drain from Tanijul Islam land to Sultan Miya land at Madhya khairbari at Sansad X |
345793 |
Construction of CC Drain from Tanijul Islam land to Sultan Miya land at Madhya khairbari at Sansad X1 |
Roof laid |
-
latitude : 26.7304449,26.7304485
Longitude : 89.2643503,89.2643556
file name : Image_01042023152456077.png
|
2023-04-01 15:24:56.17292 |
461 |
47103765 |
Construction of CC Drain from Tanijul Islam land to Sultan Miya land at Madhya khairbari at Sansad X |
345793 |
Construction of CC Drain from Tanijul Islam land to Sultan Miya land at Madhya khairbari at Sansad X1 |
Plinth level |
-
latitude : 26.7304487,26.7304449
Longitude : 89.2643575,89.2643503
file name : Image_01042023151941759.png
|
2023-04-01 15:19:41.862849 |
462 |
47103765 |
Construction of CC Drain from Tanijul Islam land to Sultan Miya land at Madhya khairbari at Sansad X |
345793 |
Construction of CC Drain from Tanijul Islam land to Sultan Miya land at Madhya khairbari at Sansad X1 |
Completion of work |
-
latitude : 26.72463459894061,26.724644657224417
Longitude : 89.2667964566499,89.26680056378245
file name : Image_01042023150929122.png
|
2023-04-01 15:09:29.238426 |
463 |
47209588 |
Installation of Rigbore Tubewell near the house of Ranjit Saiba at Uttar chhekamari Sansad XI |
280187 |
Installation of Rigbore Tubewell near the house of Ranjit Saiba at Uttar chhekamari Sansad XI1 |
Roof laid |
-
latitude : 26.70080245938152
Longitude : 89.26026125438511
file name : Image_21112022152050435.png
|
2022-11-21 15:20:50.544424 |
464 |
47209588 |
Installation of Rigbore Tubewell near the house of Ranjit Saiba at Uttar chhekamari Sansad XI |
280187 |
Installation of Rigbore Tubewell near the house of Ranjit Saiba at Uttar chhekamari Sansad XI1 |
Roof laid |
-
latitude : 26.700828024186194
Longitude : 89.26026829518378
file name : Image_21112022151935485.png
|
2022-11-21 15:19:35.58616 |
465 |
47209588 |
Installation of Rigbore Tubewell near the house of Ranjit Saiba at Uttar chhekamari Sansad XI |
280187 |
Installation of Rigbore Tubewell near the house of Ranjit Saiba at Uttar chhekamari Sansad XI1 |
Plinth level |
-
latitude : 26.700819935649633
Longitude : 89.26028271205723
file name : Image_21112022151559494.png
|
2022-11-21 15:15:59.625872 |
466 |
47209588 |
Installation of Rigbore Tubewell near the house of Ranjit Saiba at Uttar chhekamari Sansad XI |
280187 |
Installation of Rigbore Tubewell near the house of Ranjit Saiba at Uttar chhekamari Sansad XI1 |
Completion of work |
-
latitude : 26.700801998376846
Longitude : 89.26024650223553
file name : Image_21112022150653205.png
|
2022-11-21 15:06:53.295492 |
467 |
47208818 |
CONSTRUCTION OF CC DRAIN FROM RAIHNO RESORT TO BIPIN SHARMA AT PURBA KHARBARI |
346326 |
CONSTRUCTION OF CC DRAIN FROM RAIHNO RESORT TO BIPIN SHARMA AT PURBA KHARBARI 1 |
Roof laid |
-
latitude : 26.7201425,26.7202217
Longitude : 89.2892926,89.2892009
file name : Image_07012023140132196.png
|
2023-01-07 14:01:32.284475 |
468 |
47208818 |
CONSTRUCTION OF CC DRAIN FROM RAIHNO RESORT TO BIPIN SHARMA AT PURBA KHARBARI |
346326 |
CONSTRUCTION OF CC DRAIN FROM RAIHNO RESORT TO BIPIN SHARMA AT PURBA KHARBARI 1 |
Plinth level |
-
latitude : 26.7201905,26.7201655
Longitude : 89.2892359,89.2892753
file name : Image_07012023135626552.png
|
2023-01-07 13:56:26.66954 |
469 |
47208818 |
CONSTRUCTION OF CC DRAIN FROM RAIHNO RESORT TO BIPIN SHARMA AT PURBA KHARBARI |
346326 |
CONSTRUCTION OF CC DRAIN FROM RAIHNO RESORT TO BIPIN SHARMA AT PURBA KHARBARI 1 |
Completion of work |
-
latitude : 26.7201994,26.7202321
Longitude : 89.2892421,89.2891978
file name : Image_10112022154025336.png
|
2022-11-10 15:40:25.463618 |
470 |
47101153 |
Construction of Drain with slab from suravi sweets to high drain at Subhas Nagar at sansad VII |
119848 |
Construction of Drain with slab from suravi sweets to high drain at Subhas Nagar at sansad VII1 |
Roof laid |
-
latitude : 26.6943104,26.69435514137149
Longitude : 89.2813974,89.28201472386718
file name : Image_16112022124433245.png
|
2022-11-16 12:44:33.385682 |
471 |
47101153 |
Construction of Drain with slab from suravi sweets to high drain at Subhas Nagar at sansad VII |
119848 |
Construction of Drain with slab from suravi sweets to high drain at Subhas Nagar at sansad VII1 |
Plinth level |
-
latitude : 26.6947434,26.694456478580832
Longitude : 89.2815679,89.28185814991593
file name : Image_16112022124026699.png
|
2022-11-16 12:40:26.806354 |
472 |
47101153 |
Construction of Drain with slab from suravi sweets to high drain at Subhas Nagar at sansad VII |
119848 |
Construction of Drain with slab from suravi sweets to high drain at Subhas Nagar at sansad VII1 |
Completion of work |
-
latitude : 26.6914669,26.6914662
Longitude : 89.2734509,89.2734527
file name : Image_19102022102557528.png
|
2022-10-19 10:25:57.637776 |
473 |
47208762 |
CONSTRUCTION OF CC DRAIN FROM SUKRA ORAON HOUSE TO PUNAI ORAON LAND AT PURBA KHAIRBARI |
345793 |
CONSTRUCTION OF CC DRAIN FROM SUKRA ORAON HOUSE TO PUNAI ORAON LAND AT PURBA KHAIRBARI 1 |
Roof laid |
-
latitude : 26.7157728,26.71751153189689
Longitude : 89.2852668,89.28437699563801
file name : Image_14122022163042243.png
|
2022-12-14 16:30:42.345544 |
474 |
47208762 |
CONSTRUCTION OF CC DRAIN FROM SUKRA ORAON HOUSE TO PUNAI ORAON LAND AT PURBA KHAIRBARI |
345793 |
CONSTRUCTION OF CC DRAIN FROM SUKRA ORAON HOUSE TO PUNAI ORAON LAND AT PURBA KHAIRBARI 1 |
Plinth level |
-
latitude : 26.71752284746617,26.715768
Longitude : 89.28439434617758,89.2852667
file name : Image_14122022162624325.png
|
2022-12-14 16:26:24.421317 |
475 |
47208762 |
CONSTRUCTION OF CC DRAIN FROM SUKRA ORAON HOUSE TO PUNAI ORAON LAND AT PURBA KHAIRBARI |
345793 |
CONSTRUCTION OF CC DRAIN FROM SUKRA ORAON HOUSE TO PUNAI ORAON LAND AT PURBA KHAIRBARI 1 |
Completion of work |
-
latitude : 26.717854351736605,26.717552938498557
Longitude : 89.28286917507648,89.28438018076122
file name : Image_09122022145723369.png
|
2022-12-09 14:57:23.498952 |
476 |
47209262 |
Installation of Hand Pump with Water recharge Pit near house of Kanchi Tamang VII number line sansad |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Kanchi Tamang VII number line sansad1 |
Roof laid |
-
latitude : 26.71580409631133
Longitude : 89.23483500257134
file name : Image_18102022095326443.png
|
2022-10-18 09:53:26.582437 |
477 |
47209262 |
Installation of Hand Pump with Water recharge Pit near house of Kanchi Tamang VII number line sansad |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Kanchi Tamang VII number line sansad1 |
Roof laid |
-
latitude : 26.715829828754067
Longitude : 89.23473215661943
file name : Image_14102022134307270.png
|
2022-10-14 13:43:07.428429 |
478 |
47209262 |
Installation of Hand Pump with Water recharge Pit near house of Kanchi Tamang VII number line sansad |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Kanchi Tamang VII number line sansad1 |
Plinth level |
-
latitude : 26.71583435498178
Longitude : 89.23491119407117
file name : Image_28092022151713562.png
|
2022-09-28 15:17:13.653285 |
479 |
47209262 |
Installation of Hand Pump with Water recharge Pit near house of Kanchi Tamang VII number line sansad |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Kanchi Tamang VII number line sansad1 |
Completion of work |
-
latitude : 26.716237356886268
Longitude : 89.23480742610991
file name : Image_14092022133550419.png
|
2022-09-14 13:35:50.548672 |
480 |
47209024 |
Installation of Hand Pump with Water recharge Pit near house of Biren Oraon VII number line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Biren Oraon VII number line1 |
Roof laid |
-
latitude : 26.712157800793648
Longitude : 89.23777855932713
file name : Image_18102022093616559.png
|
2022-10-18 09:36:16.711059 |
481 |
47209024 |
Installation of Hand Pump with Water recharge Pit near house of Biren Oraon VII number line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Biren Oraon VII number line1 |
Roof laid |
-
latitude : 26.712217731401324
Longitude : 89.237717455253
file name : Image_14102022132130006.png
|
2022-10-14 13:21:30.122573 |
482 |
47209024 |
Installation of Hand Pump with Water recharge Pit near house of Biren Oraon VII number line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Biren Oraon VII number line1 |
Plinth level |
-
latitude : 26.7121101077646
Longitude : 89.24044769257307
file name : Image_28092022145443852.png
|
2022-09-28 14:54:43.973014 |
483 |
47209024 |
Installation of Hand Pump with Water recharge Pit near house of Biren Oraon VII number line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Biren Oraon VII number line1 |
Completion of work |
-
latitude : 26.7118667
Longitude : 89.2383102
file name : Image_14092022135556266.png
|
2022-09-14 13:55:56.389938 |
484 |
47209496 |
Installation of Hand Pump with Water recharge Pit near house of Tersha Lakra Khariya line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Tersha Lakra Khariya line1 |
Roof laid |
-
latitude : 26.7118524
Longitude : 89.2383529
file name : Image_18102022092836809.png
|
2022-10-18 09:28:36.90034 |
485 |
47209496 |
Installation of Hand Pump with Water recharge Pit near house of Tersha Lakra Khariya line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Tersha Lakra Khariya line1 |
Plinth level |
-
latitude : 26.7118672
Longitude : 89.2383106
file name : Image_18102022092549513.png
|
2022-10-18 09:25:49.621861 |
486 |
47209496 |
Installation of Hand Pump with Water recharge Pit near house of Tersha Lakra Khariya line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Tersha Lakra Khariya line1 |
Completion of work |
-
latitude : 26.712289773859084
Longitude : 89.23770010471344
file name : Image_14092022135545334.png
|
2022-09-14 13:55:45.46986 |
487 |
47209430 |
Installation of Hand Pump with Water recharge Pit near house of Sumitra Naik bech line sansad I |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Sumitra Naik bech line sansad I1 |
Roof laid |
-
latitude : 26.71770205255598
Longitude : 89.2356369830668
file name : Image_18102022101113147.png
|
2022-10-18 10:11:13.245539 |
488 |
47209430 |
Installation of Hand Pump with Water recharge Pit near house of Sumitra Naik bech line sansad I |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Sumitra Naik bech line sansad I1 |
Plinth level |
-
latitude : 26.7177293356508
Longitude : 89.23564796335995
file name : Image_28092022152359953.png
|
2022-09-28 15:24:00.051823 |
489 |
47209430 |
Installation of Hand Pump with Water recharge Pit near house of Sumitra Naik bech line sansad I |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Sumitra Naik bech line sansad I1 |
Completion of work |
-
latitude : 26.71769111417234
Longitude : 89.23562751151621
file name : Image_14092022131713247.png
|
2022-09-14 13:17:13.362234 |
490 |
47209402 |
Installation of Hand Pump with Water recharge Pit near house of Pukli Oraon football ground line san |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Pukli Oraon football ground line san1 |
Roof laid |
-
latitude : 26.715289154089987
Longitude : 89.2343967128545
file name : Image_18102022094703275.png
|
2022-10-18 09:47:03.384516 |
491 |
47209402 |
Installation of Hand Pump with Water recharge Pit near house of Pukli Oraon football ground line san |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Pukli Oraon football ground line san1 |
Plinth level |
-
latitude : 26.715322388336062
Longitude : 89.23436360433698
file name : Image_14102022133733359.png
|
2022-10-14 13:37:33.484837 |
492 |
47209402 |
Installation of Hand Pump with Water recharge Pit near house of Pukli Oraon football ground line san |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Pukli Oraon football ground line san1 |
Completion of work |
-
latitude : 26.71603003051132
Longitude : 89.23504874110222
file name : Image_28092022153018537.png
|
2022-09-28 15:30:18.631142 |
493 |
47209359 |
Installation of Hand Pump with Water recharge Pit near house of Milo Oraon VII number line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Milo Oraon VII number line1 |
Roof laid |
-
latitude : 26.714139743708074
Longitude : 89.23627425916493
file name : Image_18102022094307953.png
|
2022-10-18 09:43:08.074868 |
494 |
47209359 |
Installation of Hand Pump with Water recharge Pit near house of Milo Oraon VII number line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Milo Oraon VII number line1 |
Plinth level |
-
latitude : 26.7141141789034
Longitude : 89.23627534881234
file name : Image_18102022094027511.png
|
2022-10-18 09:40:27.634907 |
495 |
47209359 |
Installation of Hand Pump with Water recharge Pit near house of Milo Oraon VII number line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Milo Oraon VII number line1 |
Completion of work |
-
latitude : 26.714153406210244
Longitude : 89.23624567687511
file name : Image_14102022133144421.png
|
2022-10-14 13:31:44.540385 |
496 |
47209318 |
Installation of Hand Pump with Water recharge Pit near house of Mangal Oraon X number line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Mangal Oraon X number line1 |
Roof laid |
-
latitude : 26.7118478
Longitude : 89.2383683
file name : Image_18102022093208455.png
|
2022-10-18 09:32:08.606833 |
497 |
47209318 |
Installation of Hand Pump with Water recharge Pit near house of Mangal Oraon X number line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Mangal Oraon X number line1 |
Plinth level |
-
latitude : 26.7118689
Longitude : 89.2383119
file name : Image_28092022154754556.png
|
2022-09-28 15:47:54.654961 |
498 |
47209318 |
Installation of Hand Pump with Water recharge Pit near house of Mangal Oraon X number line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Mangal Oraon X number line1 |
Completion of work |
-
latitude : 26.7118711
Longitude : 89.23836
file name : Image_14092022135515740.png
|
2022-09-14 13:55:15.870525 |
499 |
47209121 |
Installation of Hand Pump with Water recharge Pit near house of Gode Oraon X number line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Gode Oraon X number line 1 |
Roof laid |
-
latitude : 26.712129721418023
Longitude : 89.24045892432332
file name : Image_18102022102619407.png
|
2022-10-18 10:26:19.503514 |
500 |
47209121 |
Installation of Hand Pump with Water recharge Pit near house of Gode Oraon X number line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Gode Oraon X number line 1 |
Plinth level |
-
latitude : 26.6914669
Longitude : 89.2734509
file name : Image_14102022130557623.png
|
2022-10-14 13:05:57.767366 |
501 |
47209121 |
Installation of Hand Pump with Water recharge Pit near house of Gode Oraon X number line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Gode Oraon X number line 1 |
Completion of work |
-
latitude : 26.712111406959593
Longitude : 89.2405167594552
file name : Image_14092022140017870.png
|
2022-09-14 14:00:17.998421 |
502 |
47209081 |
Installation of Hand Pump with Water recharge Pit near house of Gita Lohar VII number line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Gita Lohar VII number line 1 |
Roof laid |
-
latitude : 26.716225538402796
Longitude : 89.23513373360038
file name : Image_18102022095908515.png
|
2022-10-18 09:59:08.680382 |
503 |
47209081 |
Installation of Hand Pump with Water recharge Pit near house of Gita Lohar VII number line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Gita Lohar VII number line 1 |
Roof laid |
-
latitude : 26.71615580096841
Longitude : 89.23513440415263
file name : Image_18102022100148257.png
|
2022-10-18 10:01:48.372479 |
504 |
47209081 |
Installation of Hand Pump with Water recharge Pit near house of Gita Lohar VII number line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Gita Lohar VII number line 1 |
Roof laid |
-
latitude : 26.715757534839213
Longitude : 89.23488370142877
file name : Image_14102022135310356.png
|
2022-10-14 13:53:10.474171 |
505 |
47209081 |
Installation of Hand Pump with Water recharge Pit near house of Gita Lohar VII number line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Gita Lohar VII number line 1 |
Plinth level |
-
latitude : 26.716210576705635
Longitude : 89.23517430201173
file name : Image_28092022151339431.png
|
2022-09-28 15:13:39.527942 |
506 |
47209081 |
Installation of Hand Pump with Water recharge Pit near house of Gita Lohar VII number line |
28193 |
Installation of Hand Pump with Water recharge Pit near house of Gita Lohar VII number line 1 |
Completion of work |
-
latitude : 26.716250642202795
Longitude : 89.23523004166782
file name : Image_14092022131904741.png
|
2022-09-14 13:19:04.847646 |
507 |
46896639 |
Construction of Paver Block Road from Sambhu Gope house to Biplab Biswas house |
154475 |
Construction of Paver Block Road from Sambhu Gope house to Biplab Biswas house1 |
Plinth level |
-
latitude : 26.6915146,26.696013752371073
Longitude : 89.2734939,89.27685817703605
file name : Image_24092022170458147.png
|
2022-09-24 17:04:58.226962 |
508 |
46896639 |
Construction of Paver Block Road from Sambhu Gope house to Biplab Biswas house |
154475 |
Construction of Paver Block Road from Sambhu Gope house to Biplab Biswas house1 |
Completion of work |
-
latitude : 26.696093128994107,26.6915124
Longitude : 89.276754995808,89.2734914
file name : Image_17092022101356568.png
|
2022-09-17 10:13:56.662074 |
509 |
46896961 |
Construction of CC or Paver Block Road from Totopara road to Manish Mangar house |
229087 |
Construction of CC or Paver Block Road from Totopara road to Manish Mangar house1 |
Plinth level |
-
latitude : 26.7078152,26.7078048
Longitude : 89.2698529,89.2698446
file name : Image_13102022163332180.png
|
2022-10-13 16:33:32.342912 |
510 |
46896961 |
Construction of CC or Paver Block Road from Totopara road to Manish Mangar house |
229087 |
Construction of CC or Paver Block Road from Totopara road to Manish Mangar house1 |
Plinth level |
-
latitude : 26.7077974,26.7078046
Longitude : 89.2698133,89.269836
file name : Image_13102022162809005.png
|
2022-10-13 16:28:09.154819 |
511 |
46896961 |
Construction of CC or Paver Block Road from Totopara road to Manish Mangar house |
229087 |
Construction of CC or Paver Block Road from Totopara road to Manish Mangar house1 |
Completion of work |
-
latitude : 26.6915155,26.6915124
Longitude : 89.2734935,89.2734905
file name : Image_27092022102450116.png
|
2022-09-27 10:24:50.21743 |
512 |
46897039 |
Construction of CC Road from PMGSY Road to Kartik Saiba house |
348696 |
Construction of CC Road from PMGSY Road to Kartik Saiba house1 |
Roof laid |
-
latitude : 26.708655045367777,26.708939736709
Longitude : 89.25042794086039,89.25091660581529
file name : Image_28092022143423380.png
|
2022-09-28 14:34:23.48911 |
513 |
46897039 |
Construction of CC Road from PMGSY Road to Kartik Saiba house |
348696 |
Construction of CC Road from PMGSY Road to Kartik Saiba house1 |
Plinth level |
-
latitude : 26.6915125,26.6915146
Longitude : 89.2734897,89.2734939
file name : Image_23092022100139820.png
|
2022-09-23 10:01:39.910809 |
514 |
46897039 |
Construction of CC Road from PMGSY Road to Kartik Saiba house |
348696 |
Construction of CC Road from PMGSY Road to Kartik Saiba house1 |
Completion of work |
-
latitude : 26.6915154,26.70868002343923
Longitude : 89.2734749,89.250413691625
file name : Image_14092022141826575.png
|
2022-09-14 14:18:26.674773 |
515 |
46897039 |
Construction of CC Road from PMGSY Road to Kartik Saiba house |
348696 |
Construction of CC Road from PMGSY Road to Kartik Saiba house1 |
Completion of work |
-
latitude : 26.6915162,26.6915162
Longitude : 89.2734741,89.2734736
file name : Image_14092022141816201.png
|
2022-09-14 14:18:16.299209 |
516 |
47209672 |
Installation of Hand Pump with Water recharge Pit near Pranami Mandir sansad XIV |
122702 |
Installation of Hand Pump with Water recharge Pit near Pranami Mandir sansad XIV1 |
Roof laid |
-
latitude : 26.72064397484064
Longitude : 89.28117343224585
file name : Image_11012023143753981.png
|
2023-01-11 14:37:54.082366 |
517 |
47209672 |
Installation of Hand Pump with Water recharge Pit near Pranami Mandir sansad XIV |
122702 |
Installation of Hand Pump with Water recharge Pit near Pranami Mandir sansad XIV1 |
Plinth level |
-
latitude : 26.720714340917766
Longitude : 89.28118608891964
file name : Image_11012023143224330.png
|
2023-01-11 14:32:24.440177 |
518 |
47209672 |
Installation of Hand Pump with Water recharge Pit near Pranami Mandir sansad XIV |
122702 |
Installation of Hand Pump with Water recharge Pit near Pranami Mandir sansad XIV1 |
Plinth level |
-
latitude : 26.720662876032293
Longitude : 89.28104896098375
file name : Image_05122022121226566.png
|
2022-12-05 12:12:26.67858 |
519 |
47209672 |
Installation of Hand Pump with Water recharge Pit near Pranami Mandir sansad XIV |
122702 |
Installation of Hand Pump with Water recharge Pit near Pranami Mandir sansad XIV1 |
Completion of work |
-
latitude : 26.720680939033628
Longitude : 89.28112171590328
file name : Image_09112022134926985.png
|
2022-11-09 13:49:27.123014 |
520 |
47101628 |
CONSTRUCTION OF CC DRAIN FROM RAJESH TOPNO LAND TO SHYAMUAL TIGGA LAND AT PRADHAN NAGAR SANSAD IX |
347904 |
CONSTRUCTION OF CC DRAIN FROM RAJESH TOPNO LAND TO SHYAMUAL TIGGA LAND AT PRADHAN NAGAR SANSAD IX1 |
Roof laid |
-
latitude : 26.6914684,26.6914669
Longitude : 89.2734568,89.2734509
file name : Image_11102022141152812.png
|
2022-10-11 14:11:52.9109 |
521 |
47101628 |
CONSTRUCTION OF CC DRAIN FROM RAJESH TOPNO LAND TO SHYAMUAL TIGGA LAND AT PRADHAN NAGAR SANSAD IX |
347904 |
CONSTRUCTION OF CC DRAIN FROM RAJESH TOPNO LAND TO SHYAMUAL TIGGA LAND AT PRADHAN NAGAR SANSAD IX1 |
Plinth level |
-
latitude : 26.6915146,26.6915146
Longitude : 89.2734939,89.2734939
file name : Image_28092022141503201.png
|
2022-09-28 14:15:03.320214 |
522 |
47101628 |
CONSTRUCTION OF CC DRAIN FROM RAJESH TOPNO LAND TO SHYAMUAL TIGGA LAND AT PRADHAN NAGAR SANSAD IX |
347904 |
CONSTRUCTION OF CC DRAIN FROM RAJESH TOPNO LAND TO SHYAMUAL TIGGA LAND AT PRADHAN NAGAR SANSAD IX1 |
Completion of work |
-
latitude : 26.6915157,26.6915157
Longitude : 89.2734742,89.2734742
file name : Image_14092022143032792.png
|
2022-09-14 14:30:32.906874 |
523 |
46896172 |
Construction CC road from Lipika Lodh house to Sashodhar Mandal |
72655 |
Construction CC road from Lipika Lodh house to Sashodhar Mandal 1 |
Roof laid |
-
latitude : 26.6898381,26.6898722
Longitude : 89.2761509,89.276181
file name : Image_08112022093601063.png
|
2022-11-08 09:36:01.149538 |
524 |
46896172 |
Construction CC road from Lipika Lodh house to Sashodhar Mandal |
72655 |
Construction CC road from Lipika Lodh house to Sashodhar Mandal 1 |
Plinth level |
-
latitude : 26.6898725,26.6898722
Longitude : 89.276182,89.2761784
file name : Image_08112022092627691.png
|
2022-11-08 09:26:27.785595 |
525 |
46896172 |
Construction CC road from Lipika Lodh house to Sashodhar Mandal |
72655 |
Construction CC road from Lipika Lodh house to Sashodhar Mandal 1 |
Plinth level |
-
latitude : 26.6898728,26.689873
Longitude : 89.2761823,89.2761826
file name : Image_21102022122029588.png
|
2022-10-21 12:20:29.698267 |
526 |
46896172 |
Construction CC road from Lipika Lodh house to Sashodhar Mandal |
72655 |
Construction CC road from Lipika Lodh house to Sashodhar Mandal 1 |
Completion of work |
-
latitude : 26.6914662,26.6898497
Longitude : 89.2734721,89.2761823
file name : Image_29092022090439242.png
|
2022-09-29 09:04:39.32579 |
527 |
46895996 |
Construction of Paver Block Road from Dulal Saha House to Ashim Dey house |
232181 |
Construction of Paver Block Road from Dulal Saha House to Ashim Dey house 1 |
Roof laid |
-
latitude : 26.6914663,26.6914674
Longitude : 89.2734737,89.2734752
file name : Image_29092022105958379.png
|
2022-09-29 10:59:58.500977 |
528 |
46895996 |
Construction of Paver Block Road from Dulal Saha House to Ashim Dey house |
232181 |
Construction of Paver Block Road from Dulal Saha House to Ashim Dey house 1 |
Plinth level |
-
latitude : 26.6914662,26.6914673
Longitude : 89.2734721,89.2734686
file name : Image_29092022093348484.png
|
2022-09-29 09:33:48.59152 |
529 |
46895996 |
Construction of Paver Block Road from Dulal Saha House to Ashim Dey house |
232181 |
Construction of Paver Block Road from Dulal Saha House to Ashim Dey house 1 |
Completion of work |
-
latitude : 26.6915124,26.6915162
Longitude : 89.2734905,89.2734929
file name : Image_27092022090710165.png
|
2022-09-27 09:07:10.277623 |
530 |
46895996 |
Construction of Paver Block Road from Dulal Saha House to Ashim Dey house |
232181 |
Construction of Paver Block Road from Dulal Saha House to Ashim Dey house 1 |
Completion of work |
-
latitude : 26.6915123,26.6915135
Longitude : 89.2734728,89.2734685
file name : Image_13092022173345801.png
|
2022-09-13 17:33:45.911009 |
531 |
47104175 |
Construction of CC Drain from Madhya Khairbari Prymary School to Bifai Oraon house at Madhya Khairb |
290945 |
Construction of CC Drain from Madhya Khairbari Prymary School to Bifai Oraon house at Madhya Khairb1 |
Roof laid |
-
latitude : 26.718937293626368,26.717992778867483
Longitude : 89.26292577758431,89.26194115541875
file name : Image_16062022130906336.png
|
2022-06-16 13:09:06.438216 |
532 |
47104175 |
Construction of CC Drain from Madhya Khairbari Prymary School to Bifai Oraon house at Madhya Khairb |
290945 |
Construction of CC Drain from Madhya Khairbari Prymary School to Bifai Oraon house at Madhya Khairb1 |
Plinth level |
-
latitude : 26.718711610883474,26.71861714683473
Longitude : 89.26270709373057,89.26258538849652
file name : Image_15062022140239826.png
|
2022-06-15 14:02:39.90685 |
533 |
47104175 |
Construction of CC Drain from Madhya Khairbari Prymary School to Bifai Oraon house at Madhya Khairb |
290945 |
Construction of CC Drain from Madhya Khairbari Prymary School to Bifai Oraon house at Madhya Khairb1 |
Completion of work |
-
latitude : 26.6914449,26.6914448
Longitude : 89.2738077,89.273807
file name : Image_29052022164647750.png
|
2022-05-29 16:46:47.872091 |
534 |
46908998 |
Construction of CC Road from ZP road to Harka Bahadur Sarki house |
349726 |
Construction of CC Road from ZP road to Harka Bahadur Sarki house1 |
Roof laid |
-
latitude : 26.69974428601563,26.69974227435887,26.699298159219325
Longitude : 89.26187921315432,89.2618786264211,89.26364402286708
file name : Image_31052022161943379.png
|
2022-05-31 16:19:43.481162 |
535 |
46908998 |
Construction of CC Road from ZP road to Harka Bahadur Sarki house |
349726 |
Construction of CC Road from ZP road to Harka Bahadur Sarki house1 |
Plinth level |
-
latitude : 26.6914461,26.6914461
Longitude : 89.2738018,89.2738018
file name : Image_30052022120505207.png
|
2022-05-30 12:05:05.309236 |
536 |
47607324 |
Construction of toilet for women at Gram Panchayat Office |
157429 |
Construction of toilet for women at Gram Panchayat Office1 |
Plinth level |
-
latitude : 26.707899081520736
Longitude : 89.28053364157677
file name : Image_13092022163623614.png
|
2022-09-13 16:36:23.711861 |
537 |
47607324 |
Construction of toilet for women at Gram Panchayat Office |
157429 |
Construction of toilet for women at Gram Panchayat Office1 |
Roof laid |
-
latitude : 26.7078297
Longitude : 89.2805334
file name : Image_13092022165037663.png
|
2022-09-13 16:50:37.781383 |
538 |
47607324 |
Construction of toilet for women at Gram Panchayat Office |
157429 |
Construction of toilet for women at Gram Panchayat Office1 |
Plinth level |
-
latitude : 26.7078249
Longitude : 89.2805377
file name : Image_13092022162357826.png
|
2022-09-13 16:23:57.92207 |
539 |
47607324 |
Construction of toilet for women at Gram Panchayat Office |
157429 |
Construction of toilet for women at Gram Panchayat Office1 |
Completion of work |
-
latitude : 26.7078282
Longitude : 89.2805439
file name : Image_13092022160941467.png
|
2022-09-13 16:09:41.552334 |
540 |
34308619 |
Drain with slab from Biplab Saha house to Suranjan Saha house at Rabindra Nagar |
197038 |
Drain with slab from Biplab Saha house to Suranjan Saha house at Rabindra Nagar1 |
Roof laid |
-
latitude : 26.6956672,26.697178
Longitude : 89.2794085,89.2793187
file name : Image_17032021155317679.png
|
2021-03-17 15:53:17.796972 |
541 |
34308619 |
Drain with slab from Biplab Saha house to Suranjan Saha house at Rabindra Nagar |
197038 |
Drain with slab from Biplab Saha house to Suranjan Saha house at Rabindra Nagar1 |
Roof laid |
-
latitude : 26.6971383,26.695669
Longitude : 89.2792428,89.2794107
file name : Image_05032021145348703.png
|
2021-03-05 14:53:48.81961 |
542 |
34308619 |
Drain with slab from Biplab Saha house to Suranjan Saha house at Rabindra Nagar |
197038 |
Drain with slab from Biplab Saha house to Suranjan Saha house at Rabindra Nagar1 |
Completion of work |
-
latitude : 26.707922,26.707922
Longitude : 89.2805237,89.2805237
file name : Image_05032021143523429.png
|
2021-03-05 14:35:23.531294 |
543 |
34308619 |
Drain with slab from Biplab Saha house to Suranjan Saha house at Rabindra Nagar |
197038 |
Drain with slab from Biplab Saha house to Suranjan Saha house at Rabindra Nagar1 |
Completion of work |
-
latitude : 26.697182,26.6956685
Longitude : 89.2793641,89.2794108
file name : Image_08022021150123292.png
|
2021-02-08 15:01:23.388283 |
544 |
34308619 |
Drain with slab from Biplab Saha house to Suranjan Saha house at Rabindra Nagar |
197038 |
Drain with slab from Biplab Saha house to Suranjan Saha house at Rabindra Nagar1 |
Completion of work |
-
latitude : 26.697182,26.6956685
Longitude : 89.2793641,89.2794108
file name : Image_08022021150310869.png
|
2021-02-08 15:03:10.953515 |
545 |
39111530 |
Drain with slab from Lalita Lakra house to Vincent Lakra house at Uttar Madarihat |
348156 |
Drain with slab from Lalita Lakra house to Vincent Lakra house at Uttar Madarihat1 |
Roof laid |
-
latitude : 26.70785532798618,26.696892050094903
Longitude : 89.28063766099513,89.27114247344434
file name : Image_22032021153056416.png
|
2021-03-22 15:30:56.566918 |
546 |
39111530 |
Drain with slab from Lalita Lakra house to Vincent Lakra house at Uttar Madarihat |
348156 |
Drain with slab from Lalita Lakra house to Vincent Lakra house at Uttar Madarihat1 |
Plinth level |
-
latitude : 26.696890331804752,26.6968714306131
Longitude : 89.2718871217221,89.27112168632448
file name : Image_18032021142112395.png
|
2021-03-18 14:21:12.043008 |
547 |
39111530 |
Drain with slab from Lalita Lakra house to Vincent Lakra house at Uttar Madarihat |
348156 |
Drain with slab from Lalita Lakra house to Vincent Lakra house at Uttar Madarihat1 |
Completion of work |
-
latitude : 26.692528850398958,26.696940455585718
Longitude : 89.26491463556886,89.27183909341693
file name : Image_01022021145113178.png
|
2021-02-01 14:51:13.302449 |
548 |
39112139 |
Drain with slab from Digen Das house to Sashikanta Paul house at Subhas Nagar |
264143 |
Drain with slab from Digen Das house to Sashikanta Paul house at Subhas Nagar1 |
Roof laid |
-
latitude : 26.699490398168564,26.699571912176907
Longitude : 89.28450146690011,89.28382580168545
file name : Image_23092021142003267.png
|
2021-09-23 14:20:03.36686 |
549 |
39112139 |
Drain with slab from Digen Das house to Sashikanta Paul house at Subhas Nagar |
264143 |
Drain with slab from Digen Das house to Sashikanta Paul house at Subhas Nagar1 |
Plinth level |
-
latitude : 26.699486919678748,26.69958473648876
Longitude : 89.28445444442332,89.28381331264973
file name : Image_23092021141356466.png
|
2021-09-23 14:13:56.57406 |
550 |
39112139 |
Drain with slab from Digen Das house to Sashikanta Paul house at Subhas Nagar |
264143 |
Drain with slab from Digen Das house to Sashikanta Paul house at Subhas Nagar1 |
Completion of work |
-
latitude : 26.69956177007407,26.69945511035621
Longitude : 89.28377081640065,89.28442284464836
file name : Image_22062021131240507.png
|
2021-06-22 13:12:40.598595 |
551 |
39111684 |
Drain with slab from Nitai saha house to Hari Ranjan Dey house at Rabindra Nagar |
299742 |
Drain with slab from Nitai saha house to Hari Ranjan Dey house at Rabindra Nagar1 |
Roof laid |
-
latitude : 26.6970737,26.6956672
Longitude : 89.2793494,89.2794085
file name : Image_19032021170710302.png
|
2021-03-19 17:07:10.290681 |
552 |
39111684 |
Drain with slab from Nitai saha house to Hari Ranjan Dey house at Rabindra Nagar |
299742 |
Drain with slab from Nitai saha house to Hari Ranjan Dey house at Rabindra Nagar1 |
Plinth level |
-
latitude : 26.695667,26.6957594
Longitude : 89.2794061,89.2793799
file name : Image_17032021154050254.png
|
2021-03-17 15:40:50.364441 |
553 |
39111684 |
Drain with slab from Nitai saha house to Hari Ranjan Dey house at Rabindra Nagar |
299742 |
Drain with slab from Nitai saha house to Hari Ranjan Dey house at Rabindra Nagar1 |
Completion of work |
-
latitude : 26.696086758747697,26.6956679
Longitude : 89.27963568829,89.27941
file name : Image_08022021150047315.png
|
2021-02-08 15:00:47.438914 |
554 |
39111707 |
Drain with slab from Laxman Sharma house to Mahesh Thakur house at Aswini Nagar 3 |
231987 |
Drain with slab from Laxman Sharma house to Mahesh Thakur house at Aswini Nagar 31 |
Roof laid |
-
latitude : 26.6922292,26.6932855
Longitude : 89.2793135,89.2791909
file name : Image_22032021144423904.png
|
2021-03-22 14:44:24.068031 |
555 |
39111707 |
Drain with slab from Laxman Sharma house to Mahesh Thakur house at Aswini Nagar 3 |
231987 |
Drain with slab from Laxman Sharma house to Mahesh Thakur house at Aswini Nagar 31 |
Plinth level |
-
latitude : 26.692150784656405,26.6933169
Longitude : 89.27891517989337,89.2791073
file name : Image_18032021121537108.png
|
2021-03-18 12:15:37.260143 |
556 |
39111707 |
Drain with slab from Laxman Sharma house to Mahesh Thakur house at Aswini Nagar 3 |
231987 |
Drain with slab from Laxman Sharma house to Mahesh Thakur house at Aswini Nagar 31 |
Completion of work |
-
latitude : 26.69246518984437,26.693341
Longitude : 89.2790262401104,89.2791135
file name : Image_19022021134143608.png
|
2021-02-19 13:41:43.706494 |
557 |
34759295 |
CC drain from Khusi Kr Oraon house to Mangal Oraon house at Mujnai TG |
201181 |
CC drain from Khusi Kr Oraon house to Mangal Oraon house at Mujnai TG1 |
Roof laid |
-
latitude : 26.71190219465643,26.71168204396963
Longitude : 89.24200907349586,89.24144798889756
file name : Image_05032021130806948.png
|
2021-03-05 13:08:07.027105 |
558 |
34759295 |
CC drain from Khusi Kr Oraon house to Mangal Oraon house at Mujnai TG |
201181 |
CC drain from Khusi Kr Oraon house to Mangal Oraon house at Mujnai TG1 |
Plinth level |
-
latitude : 26.711892639286816,26.711707692593336
Longitude : 89.24204578623176,89.24146173521876
file name : Image_19022021134446433.png
|
2021-02-19 13:44:46.532554 |
559 |
34759295 |
CC drain from Khusi Kr Oraon house to Mangal Oraon house at Mujnai TG |
201181 |
CC drain from Khusi Kr Oraon house to Mangal Oraon house at Mujnai TG1 |
Completion of work |
-
latitude : 26.71181288547814,26.71169247943908
Longitude : 89.24194218590856,89.24141630530357
file name : Image_28012021152337587.png
|
2021-01-28 15:23:37.686195 |
560 |
39111554 |
Drain with slab from Chatterjee Saw Mill to Larensia Minj at Aswini Nagar 1 |
228283 |
Drain with slab from Chatterjee Saw Mill to Larensia Minj at Aswini Nagar 11 |
Roof laid |
-
latitude : 26.692700888961554,26.6921032
Longitude : 89.27080065943301,89.2711352
file name : Image_22062021125525699.png
|
2021-06-22 12:55:25.813211 |
561 |
39111554 |
Drain with slab from Chatterjee Saw Mill to Larensia Minj at Aswini Nagar 1 |
228283 |
Drain with slab from Chatterjee Saw Mill to Larensia Minj at Aswini Nagar 11 |
Plinth level |
-
latitude : 26.6921028,26.6921029
Longitude : 89.2711272,89.2711328
file name : Image_10062021113130462.png
|
2021-06-10 11:31:30.557617 |
562 |
39111554 |
Drain with slab from Chatterjee Saw Mill to Larensia Minj at Aswini Nagar 1 |
228283 |
Drain with slab from Chatterjee Saw Mill to Larensia Minj at Aswini Nagar 11 |
Completion of work |
-
latitude : 26.6920741,26.692772009409964
Longitude : 89.2711122,89.27045884542167
file name : Image_15022021113414974.png
|
2021-02-15 11:34:15.092302 |
563 |
39111554 |
Drain with slab from Chatterjee Saw Mill to Larensia Minj at Aswini Nagar 1 |
228283 |
Drain with slab from Chatterjee Saw Mill to Larensia Minj at Aswini Nagar 11 |
Completion of work |
-
latitude : 26.693092742934823,26.692961021326482
Longitude : 89.26921765320003,89.26980229094625
file name : Image_04022021171216516.png
|
2021-02-04 17:12:16.601138 |
564 |
39111589 |
Drain with slab from Rajesh Minj house to Minati arjo at Aswini Nagar 1 |
228283 |
Drain with slab from Rajesh Minj house to Minati arjo at Aswini Nagar 11 |
Roof laid |
-
latitude : 26.700021349824965,26.692811027169228
Longitude : 89.02887420728803,89.26499040797353
file name : Image_28062021110204083.png
|
2021-06-28 11:02:04.175078 |
565 |
39111589 |
Drain with slab from Rajesh Minj house to Minati arjo at Aswini Nagar 1 |
228283 |
Drain with slab from Rajesh Minj house to Minati arjo at Aswini Nagar 11 |
Roof laid |
-
latitude : 26.69380151666701,26.692841411568224
Longitude : 89.28104879334569,89.26494740881026
file name : Image_21062021111304350.png
|
2021-06-21 11:13:04.442821 |
566 |
39111589 |
Drain with slab from Rajesh Minj house to Minati arjo at Aswini Nagar 1 |
228283 |
Drain with slab from Rajesh Minj house to Minati arjo at Aswini Nagar 11 |
Plinth level |
-
latitude : 26.692866473458707,26.69283286202699
Longitude : 89.2653524223715,89.26495084539056
file name : Image_10062021112746559.png
|
2021-06-10 11:27:46.653826 |
567 |
39111589 |
Drain with slab from Rajesh Minj house to Minati arjo at Aswini Nagar 1 |
228283 |
Drain with slab from Rajesh Minj house to Minati arjo at Aswini Nagar 11 |
Completion of work |
-
latitude : 26.702302903868258,26.69287707656622
Longitude : 89.1554529312998,89.2655286937952
file name : Image_01022021115623313.png
|
2021-02-01 11:56:23.469087 |
568 |
70433516 |
Creation of drainage channel for management of grey water |
349676 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 26.69557973742485
Longitude : 89.26971671171486
file name : Image_31072024104832804.png
|
2024-07-31 10:48:32.902845 |
569 |
70433516 |
Creation of drainage channel for management of grey water |
349676 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 26.695790207013488
Longitude : 89.26979156211019
file name : Image_31072024103946171.png
|
2024-07-31 10:39:46.269705 |
570 |
70433516 |
Creation of drainage channel for management of grey water |
349676 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 26.69577197637409
Longitude : 89.26980128511786
file name : Image_12122023115903752.png
|
2023-12-12 11:59:03.862361 |
571 |
71646343 |
Construction of roads |
226030 |
Construction of roads1 |
Roof laid |
-
latitude : 26.705317539162934,26.705339583568275
Longitude : 89.28222603164613,89.28223541937768
file name : Image_18012024151257513.png
|
2024-01-18 15:12:57.60573 |
572 |
71646343 |
Construction of roads |
226030 |
Construction of roads1 |
Roof laid |
-
latitude : 26.70540793798864,26.705425665713847
Longitude : 89.28225788287818,89.28223776631057
file name : Image_18012024151240420.png
|
2024-01-18 15:12:40.517663 |
573 |
71646343 |
Construction of roads |
226030 |
Construction of roads1 |
Plinth level |
-
latitude : 26.705302745103836,26.705467700958252
Longitude : 89.28208211436868,89.28214657120407
file name : Image_08012024134026787.png
|
2024-01-08 13:40:26.934725 |
574 |
71646343 |
Construction of roads |
226030 |
Construction of roads1 |
Completion of work |
-
latitude : 26.705471514724195,26.705471514724195
Longitude : 89.28221002221107,89.28221002221107
file name : Image_24122023151443355.png
|
2023-12-24 15:14:43.455635 |
575 |
71646343 |
Construction of roads |
226030 |
Construction of roads1 |
Completion of work |
-
latitude : 26.705481573008,26.705461204983294
Longitude : 89.28197155706584,89.28229317069054
file name : Image_24122023151329644.png
|
2023-12-24 15:13:29.779733 |