1 |
34495086 |
REPAIRING OF TUBE WELL (MATERIALS AND WAGES) IN ALL 13 NOS SANSAD AREA UNDER JADUPUR-II GP _CFC |
652767 |
REPAIRING OF TUBE WELL (MATERIALS AND WAGES) IN ALL 13 NOS SANSAD AREA UNDER JADUPUR-II GP _CFC1 |
Completion of work |
-
latitude : 24.9787817
Longitude : 88.1541663
file name : Image_12052021104558125.png
|
2021-05-12 10:45:58.210007 |
2 |
46811703 |
Expenditure for VBD Controll Activity & Drain cleaning ( Wage & material) in all over Gram Panchayat |
300000 |
Expenditure for VBD Controll Activity & Drain cleaning ( Wage & material) in all over Gram Panchayat1 |
Plinth level |
-
latitude : 24.9751412
Longitude : 88.1547776
file name : Image_21022023165853920.png
|
2023-02-21 16:58:53.99638 |
3 |
58150075 |
CONSTRUCTION OF CC DRAIN FROM KONABARI KABARSTHAN AT KONABARI |
350000 |
CONSTRUCTION OF CC DRAIN FROM KONABARI KABARSTHAN AT KONABARI1 |
Plinth level |
-
latitude : 24.959013224579394,24.95894851628691
Longitude : 88.13038473017514,88.13029412180185
file name : Image_27042023160938177.png
|
2023-04-27 16:09:38.28928 |
4 |
58150075 |
CONSTRUCTION OF CC DRAIN FROM KONABARI KABARSTHAN AT KONABARI |
350000 |
CONSTRUCTION OF CC DRAIN FROM KONABARI KABARSTHAN AT KONABARI1 |
Plinth level |
-
latitude : 24.95892039500177,24.959039292298257
Longitude : 88.13025606796145,88.13043108209968
file name : Image_27042023161039155.png
|
2023-04-27 16:10:39.268273 |
5 |
58149932 |
CONSTRUCTION OF CC DRAIN FROM ALAM ALI HOUSE AT FULBARI |
300000 |
CONSTRUCTION OF CC DRAIN FROM ALAM ALI HOUSE AT FULBARI1 |
Plinth level |
-
latitude : 24.957791310735047,24.9576270673424
Longitude : 88.12660340219736,88.12625823542476
file name : Image_13042023172233811.png
|
2023-04-13 17:22:33.88531 |
6 |
68400527 |
Operation & maintenance of drinking water supply system |
95000 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 24.9714999
Longitude : 88.1555288
file name : Image_27042023161755122.png
|
2023-04-27 16:17:55.219242 |
7 |
68619752 |
CONSTRUCTION OF CC ROAD FROM KAMAL HOUSE TOWARDS DULAL SK HOUSE AT KONABARI |
60000 |
CONSTRUCTION OF CC ROAD FROM KAMAL HOUSE TOWARDS DULAL SK HOUSE AT KONABARI1 |
Plinth level |
-
latitude : 24.957808828912675,24.95759814977646
Longitude : 88.12812941148877,88.1281329318881
file name : Image_27042023161134724.png
|
2023-04-27 16:11:34.818351 |
8 |
58190310 |
CONSTRUCTION OF CC ROAD FROM YEASIN SEKH HOUSE AT KRISHNAPUR |
250000 |
CONSTRUCTION OF CC ROAD FROM YEASIN SEKH HOUSE AT KRISHNAPUR1 |
Plinth level |
-
latitude : 24.954122216440737,24.953969246707857
Longitude : 88.15441531129181,88.15380259416997
file name : Image_20042023111605439.png
|
2023-04-20 11:16:05.52074 |
9 |
58186781 |
CONSTRUCTION OF CC ROAD FROM AFSAR SEKH HOUSE AT BURUJPARA |
300000 |
CONSTRUCTION OF CC ROAD FROM AFSAR SEKH HOUSE AT BURUJPARA1 |
Roof laid |
-
latitude : 24.95968788396567,24.95966726448387
Longitude : 88.15220173448324,88.15220232121646
file name : Image_10052023134246242.png
|
2023-05-10 13:42:46.310041 |
10 |
58148736 |
CONSTRUCTION OF CC DRAIN FROM RANJIT HALDAR HOUSE AT MAHESHPUR |
300000 |
CONSTRUCTION OF CC DRAIN FROM RANJIT HALDAR HOUSE AT MAHESHPUR1 |
Roof laid |
-
latitude : 24.9774998,24.977528
Longitude : 88.1555866,88.1554967
file name : Image_03072024142523831.png
|
2024-07-03 14:25:23.900186 |
11 |
58148736 |
CONSTRUCTION OF CC DRAIN FROM RANJIT HALDAR HOUSE AT MAHESHPUR |
300000 |
CONSTRUCTION OF CC DRAIN FROM RANJIT HALDAR HOUSE AT MAHESHPUR1 |
Plinth level |
-
latitude : 24.9775103,24.9774996
Longitude : 88.1555374,88.1555855
file name : Image_03072024142000416.png
|
2024-07-03 14:20:00.485578 |
12 |
58148736 |
CONSTRUCTION OF CC DRAIN FROM RANJIT HALDAR HOUSE AT MAHESHPUR |
300000 |
CONSTRUCTION OF CC DRAIN FROM RANJIT HALDAR HOUSE AT MAHESHPUR1 |
Plinth level |
-
latitude : 24.9775549,24.9778039008379
Longitude : 88.1553726,88.15580528229475
file name : Image_19042023161323291.png
|
2023-04-19 16:13:23.362308 |
13 |
58183553 |
CONSTRUCTION OF CC ROAD FROM BALARAM HOUSE AT GOPALPUR |
250000 |
CONSTRUCTION OF CC ROAD FROM BALARAM HOUSE AT GOPALPUR1 |
Roof laid |
-
latitude : 24.9737125,24.9737569
Longitude : 88.1543546,88.1543773
file name : Image_03072024153510107.png
|
2024-07-03 15:35:10.170031 |
14 |
58183553 |
CONSTRUCTION OF CC ROAD FROM BALARAM HOUSE AT GOPALPUR |
250000 |
CONSTRUCTION OF CC ROAD FROM BALARAM HOUSE AT GOPALPUR1 |
Plinth level |
-
latitude : 24.9737125,24.9737487
Longitude : 88.1543546,88.1543504
file name : Image_03072024153242549.png
|
2024-07-03 15:32:42.615881 |
15 |
58183553 |
CONSTRUCTION OF CC ROAD FROM BALARAM HOUSE AT GOPALPUR |
250000 |
CONSTRUCTION OF CC ROAD FROM BALARAM HOUSE AT GOPALPUR1 |
Plinth level |
-
latitude : 24.9737125,24.973723
Longitude : 88.1543546,88.1543491
file name : Image_03072024152712490.png
|
2024-07-03 15:27:12.560145 |
16 |
58183553 |
CONSTRUCTION OF CC ROAD FROM BALARAM HOUSE AT GOPALPUR |
250000 |
CONSTRUCTION OF CC ROAD FROM BALARAM HOUSE AT GOPALPUR1 |
Plinth level |
-
latitude : 24.9737188,24.973587593995035
Longitude : 88.1543485,88.15511243417859
file name : Image_19042023162132858.png
|
2023-04-19 16:21:32.925937 |
17 |
68618020 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS SONOTI HANSDA HOUSE AT KRISHNAPUR |
50000 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS SONOTI HANSDA HOUSE AT KRISHNAPUR1 |
Plinth level |
-
latitude : 24.951662002131343,24.95170634239912
Longitude : 88.157774861902,88.15790763124824
file name : Image_10072024140212885.png
|
2024-07-10 14:02:12.952692 |
18 |
68618020 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS SONOTI HANSDA HOUSE AT KRISHNAPUR |
50000 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS SONOTI HANSDA HOUSE AT KRISHNAPUR1 |
Completion of work |
-
latitude : 24.951729141175747,24.951648004353046
Longitude : 88.15791483968496,88.15778458490968
file name : Image_10072024135404447.png
|
2024-07-10 13:54:04.513537 |
19 |
68618020 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS SONOTI HANSDA HOUSE AT KRISHNAPUR |
50000 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS SONOTI HANSDA HOUSE AT KRISHNAPUR1 |
Completion of work |
-
latitude : 24.951688782311976,24.9516814481467
Longitude : 88.1579130794853,88.15790159627795
file name : Image_20042023112502550.png
|
2023-04-20 11:25:02.622114 |
20 |
67587424 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.9610325,24.961868561804295
Longitude : 88.1616005,88.16141369752586
file name : Image_08042024173416152.png
|
2024-04-08 17:34:16.234156 |
21 |
67587424 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.9619031,24.9619041
Longitude : 88.1617156,88.1617162
file name : Image_08042024172725258.png
|
2024-04-08 17:27:25.329763 |
22 |
67587424 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.9619029,24.9619023
Longitude : 88.1617161,88.161714
file name : Image_08042024172344890.png
|
2024-04-08 17:23:44.958697 |
23 |
67587424 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.9619022,24.9619028
Longitude : 88.1617104,88.1617153
file name : Image_08042024171905726.png
|
2024-04-08 17:19:05.796299 |
24 |
67636549 |
Construction of Building |
126000 |
Construction of Building1 |
Plinth level |
-
latitude : 24.9787574
Longitude : 88.1541714
file name : Image_26092024171702590.png
|
2024-09-26 17:17:02.712765 |
25 |
67636549 |
Construction of Building |
126000 |
Construction of Building1 |
Completion of work |
-
latitude : 24.9787185
Longitude : 88.1541634
file name : Image_24072024172529870.png
|
2024-07-24 17:25:29.957134 |
26 |
67636549 |
Construction of Building |
126000 |
Construction of Building1 |
Completion of work |
-
latitude : 24.978739
Longitude : 88.1542198
file name : Image_04072024171346618.png
|
2024-07-04 17:13:46.692753 |
27 |
86817494 |
CULVERT WITH HUME PIPE AT KONABARI NEAR GRAVE YARD OF JADUPUR 2 GP |
125000 |
CULVERT WITH HUME PIPE AT KONABARI NEAR GRAVE YARD OF JADUPUR 2 GP1 |
Completion of work |
-
latitude : 24.958965238183737,24.958949480205774
Longitude : 88.13018088229,88.13026947900653
file name : Image_04082023151327753.png
|
2023-08-04 15:13:27.817528 |
28 |
86817494 |
CULVERT WITH HUME PIPE AT KONABARI NEAR GRAVE YARD OF JADUPUR 2 GP |
125000 |
CULVERT WITH HUME PIPE AT KONABARI NEAR GRAVE YARD OF JADUPUR 2 GP1 |
Completion of work |
-
latitude : 24.958901242353022,24.958941475488245
Longitude : 88.13018909655511,88.13026319257915
file name : Image_04082023150935795.png
|
2023-08-04 15:09:35.864726 |
29 |
86817494 |
CULVERT WITH HUME PIPE AT KONABARI NEAR GRAVE YARD OF JADUPUR 2 GP |
125000 |
CULVERT WITH HUME PIPE AT KONABARI NEAR GRAVE YARD OF JADUPUR 2 GP1 |
Completion of work |
-
latitude : 24.95892110746354,24.9589360691607
Longitude : 88.13020720146596,88.13027618452907
file name : Image_04082023145740377.png
|
2023-08-04 14:57:40.4445 |
30 |
58139756 |
EXPENDITURE FOR WATER TESTING FACILITATOR |
124110 |
EXPENDITURE FOR WATER TESTING FACILITATOR1 |
Plinth level |
-
latitude : 24.9787697
Longitude : 88.1541626
file name : Image_08082023132618148.png
|
2023-08-08 13:26:18.231596 |
31 |
58139756 |
EXPENDITURE FOR WATER TESTING FACILITATOR |
124110 |
EXPENDITURE FOR WATER TESTING FACILITATOR1 |
Completion of work |
-
latitude : 24.9787711
Longitude : 88.1541605
file name : Image_08082023132426964.png
|
2023-08-08 13:24:27.050296 |
32 |
86485396 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.942985852248967
Longitude : 88.1345154158771
file name : Image_13092023174542449.png
|
2023-09-13 17:45:42.51239 |
33 |
86485396 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.942961209453642
Longitude : 88.1344450917095
file name : Image_13092023174335083.png
|
2023-09-13 17:43:35.152751 |
34 |
86485396 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.942954126745462
Longitude : 88.13446403481066
file name : Image_13092023173353854.png
|
2023-09-13 17:33:53.918353 |
35 |
58195807 |
CONSTRUCTION OF CC ROAD FROM JAINAL HOUSE AT FULBARI |
250000 |
CONSTRUCTION OF CC ROAD FROM JAINAL HOUSE AT FULBARI1 |
Completion of work |
-
latitude : 24.95779784861952,24.957751664333045
Longitude : 88.12889040447772,88.12860885635018
file name : Image_04082023152712630.png
|
2023-08-04 15:27:12.704048 |
36 |
58195807 |
CONSTRUCTION OF CC ROAD FROM JAINAL HOUSE AT FULBARI |
250000 |
CONSTRUCTION OF CC ROAD FROM JAINAL HOUSE AT FULBARI1 |
Completion of work |
-
latitude : 24.95781029574573,24.95775992050767
Longitude : 88.12889476306736,88.1286149751395
file name : Image_04082023152048308.png
|
2023-08-04 15:20:48.385787 |
37 |
58195807 |
CONSTRUCTION OF CC ROAD FROM JAINAL HOUSE AT FULBARI |
250000 |
CONSTRUCTION OF CC ROAD FROM JAINAL HOUSE AT FULBARI1 |
Completion of work |
-
latitude : 24.957814696244895,24.957776432856917
Longitude : 88.128840951249,88.12857926823199
file name : Image_02082023133546738.png
|
2023-08-02 13:35:49.103907 |
38 |
86485522 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Roof laid |
-
latitude : 24.960518656298518
Longitude : 88.15195295959711
file name : Image_11082023135931674.png
|
2023-08-11 13:59:31.747845 |
39 |
86485522 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Plinth level |
-
latitude : 24.96046895161271
Longitude : 88.1519516184926
file name : Image_11082023135145118.png
|
2023-08-11 13:51:45.194076 |
40 |
86485522 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.960480853915215
Longitude : 88.15192027017474
file name : Image_11082023134341558.png
|
2023-08-11 13:43:43.010974 |
41 |
86486633 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Roof laid |
-
latitude : 24.94394415523857
Longitude : 88.16034601069987
file name : Image_11082023152807526.png
|
2023-08-11 15:28:07.615019 |
42 |
86486633 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Plinth level |
-
latitude : 24.943906939588487
Longitude : 88.16034542396665
file name : Image_11082023152032816.png
|
2023-08-11 15:20:32.89204 |
43 |
86486633 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Plinth level |
-
latitude : 24.943923787213862
Longitude : 88.16038423217833
file name : Image_11082023151351755.png
|
2023-08-11 15:13:51.835912 |
44 |
86486633 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.9438086617738
Longitude : 88.16037576645613
file name : Image_11082023150641818.png
|
2023-08-11 15:06:42.151574 |
45 |
86486633 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.943859707564116
Longitude : 88.16040233708918
file name : Image_11082023150343355.png
|
2023-08-11 15:03:43.448351 |
46 |
86486611 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Roof laid |
-
latitude : 24.93986732326448
Longitude : 88.15677037462592
file name : Image_11082023144216501.png
|
2023-08-11 14:42:16.624068 |
47 |
86486611 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Plinth level |
-
latitude : 24.939836394041777
Longitude : 88.15674992278218
file name : Image_11082023143603799.png
|
2023-08-11 14:36:03.875788 |
48 |
86486611 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.939865563064814
Longitude : 88.15685570240021
file name : Image_11082023142927036.png
|
2023-08-11 14:29:27.131263 |
49 |
86486611 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.939878303557634
Longitude : 88.15686601214111
file name : Image_11082023141453012.png
|
2023-08-11 14:14:53.463671 |
50 |
86486689 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Roof laid |
-
latitude : 24.952937560155988
Longitude : 88.1736467499286
file name : Image_11082023160644243.png
|
2023-08-11 16:06:44.32613 |
51 |
86486689 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Plinth level |
-
latitude : 24.952969579026103
Longitude : 88.17366250790656
file name : Image_11082023160128019.png
|
2023-08-11 16:01:28.092186 |
52 |
86486689 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.952922808006406
Longitude : 88.17366971634328
file name : Image_11082023155753175.png
|
2023-08-11 15:57:53.248973 |
53 |
86486711 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Roof laid |
-
latitude : 24.95548247359693
Longitude : 88.17461871542037
file name : Image_11082023165518882.png
|
2023-08-11 16:55:18.96991 |
54 |
86486711 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Plinth level |
-
latitude : 24.95545112527907
Longitude : 88.1745963357389
file name : Image_11082023165234357.png
|
2023-08-11 16:52:34.431226 |
55 |
86486711 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.95549714192748
Longitude : 88.1745855230838
file name : Image_11082023164551818.png
|
2023-08-11 16:45:51.921311 |
56 |
86837753 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.95631969999522
Longitude : 88.15530622377992
file name : Image_11082023180442490.png
|
2023-08-11 18:04:42.560523 |
57 |
86837753 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.95618978049606
Longitude : 88.15516934730113
file name : Image_11082023175914384.png
|
2023-08-11 17:59:14.439452 |
58 |
86837753 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.978734417818487
Longitude : 88.15414792858064
file name : Image_11082023175601908.png
|
2023-08-11 17:56:01.979857 |
59 |
86486549 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.97216170653701
Longitude : 88.15836142748594
file name : Image_01092023123456184.png
|
2023-09-01 12:34:56.299639 |
60 |
86486549 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.97215814422816
Longitude : 88.15836427733302
file name : Image_01092023123314285.png
|
2023-09-01 12:33:14.346818 |
61 |
86486549 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.972182577475905
Longitude : 88.15830241888762
file name : Image_01092023123006092.png
|
2023-09-01 12:30:06.195164 |
62 |
86486655 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.9737138
Longitude : 88.154334
file name : Image_01092023130913296.png
|
2023-09-01 13:09:13.376059 |
63 |
86486655 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.9737147
Longitude : 88.1543393
file name : Image_01092023125603895.png
|
2023-09-01 12:56:03.961471 |
64 |
86486655 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.9737105
Longitude : 88.1543368
file name : Image_01092023124839808.png
|
2023-09-01 12:48:39.884558 |
65 |
86485428 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.9714126996696
Longitude : 88.15466383472085
file name : Image_01092023133308990.png
|
2023-09-01 13:33:09.06839 |
66 |
86485428 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.971433780156076
Longitude : 88.1546251103282
file name : Image_01092023133034291.png
|
2023-09-01 13:30:34.360337 |
67 |
86485428 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.971411023288965
Longitude : 88.15463089384139
file name : Image_01092023132648261.png
|
2023-09-01 13:26:48.33552 |
68 |
86485492 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.9709314
Longitude : 88.1533198
file name : Image_01092023135701985.png
|
2023-09-01 13:57:02.063525 |
69 |
86485492 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.9709323
Longitude : 88.1533196
file name : Image_01092023135205511.png
|
2023-09-01 13:52:05.642412 |
70 |
86485492 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.9709319
Longitude : 88.1533255
file name : Image_01092023134631799.png
|
2023-09-01 13:46:31.868658 |
71 |
86486530 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.968107505701482
Longitude : 88.163993479684
file name : Image_01092023144509067.png
|
2023-09-01 14:45:09.144739 |
72 |
86486530 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.968097950331867
Longitude : 88.1639567669481
file name : Image_01092023144024661.png
|
2023-09-01 14:40:24.737772 |
73 |
86486530 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.968114253133535
Longitude : 88.16400337032974
file name : Image_01092023142710621.png
|
2023-09-01 14:27:10.683716 |
74 |
86485471 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.958944115787745
Longitude : 88.16292998380959
file name : Image_01092023154849241.png
|
2023-09-01 15:48:49.320065 |
75 |
86485471 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.965673903934658
Longitude : 88.16717198118567
file name : Image_01092023150844319.png
|
2023-09-01 15:08:44.397143 |
76 |
86485471 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.965644986368716
Longitude : 88.16723425872624
file name : Image_01092023150526036.png
|
2023-09-01 15:05:26.114228 |
77 |
86485471 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.96567541267723
Longitude : 88.16721145994961
file name : Image_01092023150225002.png
|
2023-09-01 15:02:25.077405 |
78 |
86485699 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.960652515292168
Longitude : 88.16204762086272
file name : Image_01092023152530212.png
|
2023-09-01 15:25:30.279303 |
79 |
86485699 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.960675607435405
Longitude : 88.16203370690346
file name : Image_01092023152210049.png
|
2023-09-01 15:22:10.137528 |
80 |
86485699 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.96067221276462
Longitude : 88.16205868497491
file name : Image_01092023151850345.png
|
2023-09-01 15:18:50.423389 |
81 |
86485731 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.95893770363182
Longitude : 88.1628795247525
file name : Image_01092023154645585.png
|
2023-09-01 15:46:45.66245 |
82 |
86485731 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.958975757472217
Longitude : 88.16291615366936
file name : Image_01092023153148753.png
|
2023-09-01 15:31:48.833674 |
83 |
86485613 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.9578135
Longitude : 88.1536648
file name : Image_01092023161750307.png
|
2023-09-01 16:17:50.389967 |
84 |
86485613 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.957814
Longitude : 88.1536587
file name : Image_01092023161554062.png
|
2023-09-01 16:15:54.140624 |
85 |
86485613 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.9578126
Longitude : 88.1536585
file name : Image_01092023161211229.png
|
2023-09-01 16:12:11.409994 |
86 |
86485632 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.959116112440825
Longitude : 88.15398716367781
file name : Image_01092023162733415.png
|
2023-09-01 16:27:33.491861 |
87 |
86485632 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.959083339199424
Longitude : 88.15395338460803
file name : Image_01092023162516010.png
|
2023-09-01 16:25:16.091584 |
88 |
86485632 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.959088410250843
Longitude : 88.15392388030887
file name : Image_01092023162213161.png
|
2023-09-01 16:22:13.229478 |
89 |
86485453 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.97487002518028
Longitude : 88.15827576443553
file name : Image_31082023170216716.png
|
2023-08-31 17:02:16.780593 |
90 |
86485453 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.97488125693053
Longitude : 88.15827400423586
file name : Image_31082023163628906.png
|
2023-08-31 16:36:28.967983 |
91 |
86485453 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.974880418740213
Longitude : 88.1583171710372
file name : Image_31082023163330207.png
|
2023-08-31 16:33:30.274068 |
92 |
86485453 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.974873000755906
Longitude : 88.15829110331833
file name : Image_31082023162204699.png
|
2023-08-31 16:22:04.763033 |
93 |
86485576 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.974192
Longitude : 88.1473654
file name : Image_04092023132824548.png
|
2023-09-04 13:28:24.815849 |
94 |
86485576 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.9741893
Longitude : 88.1473655
file name : Image_04092023130329661.png
|
2023-09-04 13:03:29.728153 |
95 |
86485576 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.972570198588073
Longitude : 88.14745799638331
file name : Image_04092023125444506.png
|
2023-09-04 12:54:44.602301 |
96 |
86485676 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.9308836
Longitude : 88.1293149
file name : Image_04092023143101268.png
|
2023-09-04 14:31:01.496263 |
97 |
86485676 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.9308842
Longitude : 88.1293152
file name : Image_04092023142329577.png
|
2023-09-04 14:23:29.693716 |
98 |
86485676 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.9308847
Longitude : 88.1293155
file name : Image_04092023141824428.png
|
2023-09-04 14:18:24.500823 |
99 |
86485676 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.9306373
Longitude : 88.1289459
file name : Image_04092023140336948.png
|
2023-09-04 14:03:37.035388 |
100 |
84452666 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.94283812120557
Longitude : 88.13408919610083
file name : Image_04092023150042230.png
|
2023-09-04 15:00:42.311932 |
101 |
84452666 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.942791517823935
Longitude : 88.13414946198463
file name : Image_04092023125324931.png
|
2023-09-04 12:53:25.00958 |
102 |
46811789 |
Expenditure Tube Well Repairing (wages and materials purchase ) all gram sansad in Gram Panchayat Ar |
400000 |
Expenditure Tube Well Repairing (wages and materials purchase ) all gram sansad in Gram Panchayat Ar1 |
Completion of work |
-
latitude : 24.9787892
Longitude : 88.1541612
file name : Image_15062022144632552.png
|
2022-06-15 14:46:32.640918 |
103 |
86486669 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.9631333
Longitude : 88.1686673
file name : Image_13092023160251554.png
|
2023-09-13 16:02:51.632494 |
104 |
86486669 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.965818910859525
Longitude : 88.16600991412997
file name : Image_13092023160046030.png
|
2023-09-13 16:00:46.100268 |
105 |
86486669 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.978537862189114
Longitude : 88.15432537347078
file name : Image_13092023153213758.png
|
2023-09-13 15:32:13.830665 |
106 |
86485415 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.97401875909418
Longitude : 88.15714119002223
file name : Image_13092023164404789.png
|
2023-09-13 16:44:04.880861 |
107 |
86485415 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.973937035538256
Longitude : 88.15713934600353
file name : Image_13092023163257282.png
|
2023-09-13 16:32:57.360644 |
108 |
86485415 |
Creation of community soak pits for group of Households |
13318 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.973951200954616
Longitude : 88.15700179897249
file name : Image_13092023162441174.png
|
2023-09-13 16:24:41.29984 |
109 |
58188939 |
CONSTRUCTION OF CC ROAD FROM BSF GATE NO 24 AT MOSLEMPUR |
350000 |
CONSTRUCTION OF CC ROAD FROM BSF GATE NO 24 AT MOSLEMPUR1 |
Roof laid |
-
latitude : 24.943242422305048,24.943402893841267
Longitude : 88.1575465388596,88.15740044228733
file name : Image_19092024122301698.png
|
2024-09-19 12:23:01.78193 |
110 |
58188939 |
CONSTRUCTION OF CC ROAD FROM BSF GATE NO 24 AT MOSLEMPUR |
350000 |
CONSTRUCTION OF CC ROAD FROM BSF GATE NO 24 AT MOSLEMPUR1 |
Plinth level |
-
latitude : 24.94325989857316,24.94342774618417
Longitude : 88.15758367069066,88.15736062824726
file name : Image_19092024121327118.png
|
2024-09-19 12:13:27.181633 |
111 |
58188939 |
CONSTRUCTION OF CC ROAD FROM BSF GATE NO 24 AT MOSLEMPUR |
350000 |
CONSTRUCTION OF CC ROAD FROM BSF GATE NO 24 AT MOSLEMPUR1 |
Completion of work |
-
latitude : 24.943289360962808,24.943289360962808
Longitude : 88.15759942866862,88.15759942866862
file name : Image_22092023170218441.png
|
2023-09-22 17:02:18.500063 |
112 |
58188939 |
CONSTRUCTION OF CC ROAD FROM BSF GATE NO 24 AT MOSLEMPUR |
350000 |
CONSTRUCTION OF CC ROAD FROM BSF GATE NO 24 AT MOSLEMPUR1 |
Completion of work |
-
latitude : 24.94327678810805,24.943533525802195
Longitude : 88.15760680474341,88.15734101459384
file name : Image_22092023165854452.png
|
2023-09-22 16:58:54.522081 |
113 |
58188939 |
CONSTRUCTION OF CC ROAD FROM BSF GATE NO 24 AT MOSLEMPUR |
350000 |
CONSTRUCTION OF CC ROAD FROM BSF GATE NO 24 AT MOSLEMPUR1 |
Completion of work |
-
latitude : 24.943283200263977,24.94354551192373
Longitude : 88.15762960352004,88.15731033682823
file name : Image_22092023165657398.png
|
2023-09-22 16:56:57.465533 |
114 |
58197114 |
CONSTRUCTION OF CC ROAD FROM RABBUL SK HOUSE AT KONABARI |
200000 |
CONSTRUCTION OF CC ROAD FROM RABBUL SK HOUSE AT KONABARI1 |
Completion of work |
-
latitude : 24.9589806,24.95905626565218
Longitude : 88.1261911,88.12680138275027
file name : Image_22092023172823725.png
|
2023-09-22 17:28:23.786896 |
115 |
58197114 |
CONSTRUCTION OF CC ROAD FROM RABBUL SK HOUSE AT KONABARI |
200000 |
CONSTRUCTION OF CC ROAD FROM RABBUL SK HOUSE AT KONABARI1 |
Completion of work |
-
latitude : 24.9589807,24.959034179337323
Longitude : 88.1261964,88.12663156539202
file name : Image_22092023172627840.png
|
2023-09-22 17:26:27.90003 |
116 |
58197114 |
CONSTRUCTION OF CC ROAD FROM RABBUL SK HOUSE AT KONABARI |
200000 |
CONSTRUCTION OF CC ROAD FROM RABBUL SK HOUSE AT KONABARI1 |
Completion of work |
-
latitude : 24.9589803,24.9589803
Longitude : 88.1261922,88.1261922
file name : Image_22092023172402949.png
|
2023-09-22 17:24:03.015018 |
117 |
68339183 |
Drinking water facility |
200000 |
Drinking water facility1 |
Roof laid |
-
latitude : 24.958486
Longitude : 88.1641095
file name : Image_02012024152345406.png
|
2024-01-02 15:23:45.480963 |
118 |
68339183 |
Drinking water facility |
200000 |
Drinking water facility1 |
Plinth level |
-
latitude : 24.9584272
Longitude : 88.1640962
file name : Image_02012024151620077.png
|
2024-01-02 15:16:20.161147 |
119 |
68339183 |
Drinking water facility |
200000 |
Drinking water facility1 |
Completion of work |
-
latitude : 24.9583554
Longitude : 88.1641269
file name : Image_02012024150509761.png
|
2024-01-02 15:05:09.841904 |
120 |
71691526 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.9621169
Longitude : 88.1250103
file name : Image_04092024163203943.png
|
2024-09-04 16:32:04.010959 |
121 |
71691526 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.962095292285085
Longitude : 88.12513665296137
file name : Image_04092024161318220.png
|
2024-09-04 16:13:18.294909 |
122 |
71691526 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.9787196
Longitude : 88.1541938
file name : Image_04092024152059043.png
|
2024-09-04 15:20:59.111944 |
123 |
98312097 |
Creation of a new source of drinking water |
490000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.947153753601015
Longitude : 88.16204158589244
file name : Image_06092024172815266.png
|
2024-09-06 17:28:15.357985 |
124 |
98312097 |
Creation of a new source of drinking water |
490000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.94718757458031
Longitude : 88.16203404217958
file name : Image_04092024170356857.png
|
2024-09-04 17:03:56.935059 |
125 |
98312097 |
Creation of a new source of drinking water |
490000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.947198135778308
Longitude : 88.1620507221669
file name : Image_04092024165934011.png
|
2024-09-04 16:59:34.077728 |
126 |
67567164 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.936371063813567,24.936391934752464
Longitude : 88.1353119481355,88.13531479798257
file name : Image_08122023145145619.png
|
2023-12-08 14:51:45.688596 |
127 |
67567164 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.936342439614236,24.93634403217584
Longitude : 88.1353270355612,88.13532276079059
file name : Image_06122023143640867.png
|
2023-12-06 14:36:40.940338 |
128 |
67567164 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.936387701891363,24.936397089622915
Longitude : 88.13528730534017,88.13530390150845
file name : Image_06122023143459089.png
|
2023-12-06 14:34:59.16702 |
129 |
67567164 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.93634818121791,24.93634818121791
Longitude : 88.13529342412949,88.13529342412949
file name : Image_01122023145017327.png
|
2023-12-01 14:50:17.402585 |
130 |
67567164 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.93630526587367,24.93630526587367
Longitude : 88.13529384322464,88.13529384322464
file name : Image_04122023132325079.png
|
2023-12-04 13:23:25.157038 |
131 |
67567164 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.93630346376449,24.936319347471
Longitude : 88.1353183183819,88.13530599698424
file name : Image_01122023144922279.png
|
2023-12-01 14:49:22.355825 |
132 |
67645428 |
Drainage Construction |
348973 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.96852840296924
Longitude : 88.16488481126726
file name : Image_06122023130931031.png
|
2023-12-06 13:09:31.103866 |
133 |
67645428 |
Drainage Construction |
348973 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.968455103226006
Longitude : 88.16479177214205
file name : Image_01122023124838692.png
|
2023-12-01 12:48:38.779635 |
134 |
67645428 |
Drainage Construction |
348973 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.968699854798615
Longitude : 88.16519368439913
file name : Image_28112023164047213.png
|
2023-11-28 16:40:47.279121 |
135 |
67645649 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.9764242
Longitude : 88.1567927
file name : Image_05022024165542382.png
|
2024-02-05 16:55:42.449312 |
136 |
67645649 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.976614844053984
Longitude : 88.15680691972375
file name : Image_05022024165258672.png
|
2024-02-05 16:52:58.743909 |
137 |
67645649 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.9763963
Longitude : 88.1568381
file name : Image_05022024164139739.png
|
2024-02-05 16:41:39.810914 |
138 |
67645649 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.9764635
Longitude : 88.1567161
file name : Image_05122023143548103.png
|
2023-12-05 14:35:48.191109 |
139 |
67588517 |
Construction of roads |
225000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.9564711,24.9564705
Longitude : 88.122766,88.1227644
file name : Image_26012024093405018.png
|
2024-01-26 09:34:05.084388 |
140 |
67588517 |
Construction of roads |
225000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.9564709,24.9564709
Longitude : 88.1227662,88.122765
file name : Image_26012024093012355.png
|
2024-01-26 09:30:12.442168 |
141 |
67588517 |
Construction of roads |
225000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.9564707,24.9564699
Longitude : 88.1227647,88.1227617
file name : Image_03012024160800311.png
|
2024-01-03 16:08:00.379692 |
142 |
67588517 |
Construction of roads |
225000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.9564715,24.9564715
Longitude : 88.1227659,88.1227654
file name : Image_03012024160150884.png
|
2024-01-03 16:01:50.963387 |
143 |
58185451 |
CONSTRUCTION OF CC ROAD FROM PURNIMA MANDAL HOUSE AT MAHESHPUR |
250000 |
CONSTRUCTION OF CC ROAD FROM PURNIMA MANDAL HOUSE AT MAHESHPUR1 |
Roof laid |
-
latitude : 24.97419155202806,24.9741747463122
Longitude : 88.1492651347071,88.14924795180559
file name : Image_15122023164330608.png
|
2023-12-15 16:43:30.6995 |
144 |
58185451 |
CONSTRUCTION OF CC ROAD FROM PURNIMA MANDAL HOUSE AT MAHESHPUR |
250000 |
CONSTRUCTION OF CC ROAD FROM PURNIMA MANDAL HOUSE AT MAHESHPUR1 |
Roof laid |
-
latitude : 24.97419155202806,24.9741747463122
Longitude : 88.1492651347071,88.14924795180559
file name : Image_15122023164323636.png
|
2023-12-15 16:43:23.747546 |
145 |
58185451 |
CONSTRUCTION OF CC ROAD FROM PURNIMA MANDAL HOUSE AT MAHESHPUR |
250000 |
CONSTRUCTION OF CC ROAD FROM PURNIMA MANDAL HOUSE AT MAHESHPUR1 |
Roof laid |
-
latitude : 24.974147421307862,24.974154043011367
Longitude : 88.14929069951177,88.14927108585835
file name : Image_15122023164314467.png
|
2023-12-15 16:43:14.550904 |
146 |
58185451 |
CONSTRUCTION OF CC ROAD FROM PURNIMA MANDAL HOUSE AT MAHESHPUR |
250000 |
CONSTRUCTION OF CC ROAD FROM PURNIMA MANDAL HOUSE AT MAHESHPUR1 |
Plinth level |
-
latitude : 24.974224660545588,24.974216781556606
Longitude : 88.14929338172078,88.14930436201394
file name : Image_15122023160202205.png
|
2023-12-15 16:02:02.275907 |
147 |
58185451 |
CONSTRUCTION OF CC ROAD FROM PURNIMA MANDAL HOUSE AT MAHESHPUR |
250000 |
CONSTRUCTION OF CC ROAD FROM PURNIMA MANDAL HOUSE AT MAHESHPUR1 |
Completion of work |
-
latitude : 24.974281238391995,24.97427905909717
Longitude : 88.14927083440125,88.14924912527204
file name : Image_04122023150527009.png
|
2023-12-04 15:05:27.074604 |
148 |
58185451 |
CONSTRUCTION OF CC ROAD FROM PURNIMA MANDAL HOUSE AT MAHESHPUR |
250000 |
CONSTRUCTION OF CC ROAD FROM PURNIMA MANDAL HOUSE AT MAHESHPUR1 |
Completion of work |
-
latitude : 24.97427905909717,24.97427905909717
Longitude : 88.14924912527204,88.14924912527204
file name : Image_04122023150450006.png
|
2023-12-04 15:04:50.072076 |
149 |
58185451 |
CONSTRUCTION OF CC ROAD FROM PURNIMA MANDAL HOUSE AT MAHESHPUR |
250000 |
CONSTRUCTION OF CC ROAD FROM PURNIMA MANDAL HOUSE AT MAHESHPUR1 |
Completion of work |
-
latitude : 24.974281238391995,24.97427905909717
Longitude : 88.14927083440125,88.14924912527204
file name : Image_04122023150436013.png
|
2023-12-04 15:04:36.095255 |
150 |
86583319 |
Water Supply to villages |
280000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.942692653276026
Longitude : 88.13412448391318
file name : Image_06122023144241765.png
|
2023-12-06 14:42:41.848755 |
151 |
86583319 |
Water Supply to villages |
280000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.94278267491609
Longitude : 88.13414979726076
file name : Image_06122023141202408.png
|
2023-12-06 14:12:02.503302 |
152 |
86583319 |
Water Supply to villages |
280000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.942751829512417
Longitude : 88.13421819359064
file name : Image_04122023150459724.png
|
2023-12-04 15:04:59.81566 |
153 |
86837657 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 24.9612189643085
Longitude : 88.16196732223034
file name : Image_19122023164508338.png
|
2023-12-19 16:45:08.409803 |
154 |
86837657 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.961198973469436
Longitude : 88.16192843019962
file name : Image_12122023141634005.png
|
2023-12-12 14:16:34.086774 |
155 |
86837657 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.961039130575955
Longitude : 88.16200453788042
file name : Image_11122023152750242.png
|
2023-12-11 15:27:50.31944 |
156 |
46812005 |
WATER TESTING FACILITY IN ALL OVER GRAM PANCHAYAT |
81383 |
WATER TESTING FACILITY IN ALL OVER GRAM PANCHAYAT1 |
Plinth level |
-
latitude : 24.9788036
Longitude : 88.1541349
file name : Image_25032022161738261.png
|
2022-03-25 16:17:38.332831 |
157 |
34463129 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM BHOLA HOUSE TOWARDS MAINUL ISLAM HOUSE AT KONABARI CFC |
200000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM BHOLA HOUSE TOWARDS MAINUL ISLAM HOUSE AT KONABARI CFC1 |
Completion of work |
-
latitude : 24.96127047110349,24.961292641237378
Longitude : 88.12560335732996,88.1256119068712
file name : Image_26012021114841072.png
|
2021-01-26 11:48:41.158783 |
158 |
39053320 |
CONSTRUCTION OF DRAIN WITH COVER FROM MANARUL SK HOUSE TOWARDS POND CFC TIED |
250000 |
CONSTRUCTION OF DRAIN WITH COVER FROM MANARUL SK HOUSE TOWARDS POND CFC TIED 1 |
Completion of work |
-
latitude : 24.958549747243524,24.958549747243524
Longitude : 88.12948694452643,88.12948694452643
file name : Image_28012021160122599.png
|
2021-01-28 16:01:22.666603 |
159 |
34481225 |
CONSTRUCTION OF CC ROAD FROM RABI SAHANI HOUSE TOWARDS ANITA MANDAL HOUSE AT GOPALPUR _CFC |
150000 |
CONSTRUCTION OF CC ROAD FROM RABI SAHANI HOUSE TOWARDS ANITA MANDAL HOUSE AT GOPALPUR _CFC1 |
Roof laid |
-
latitude : 24.9748304,24.9751234
Longitude : 88.1573201,88.1579398
file name : Image_21052024151331793.png
|
2024-05-21 15:13:31.859243 |
160 |
34481225 |
CONSTRUCTION OF CC ROAD FROM RABI SAHANI HOUSE TOWARDS ANITA MANDAL HOUSE AT GOPALPUR _CFC |
150000 |
CONSTRUCTION OF CC ROAD FROM RABI SAHANI HOUSE TOWARDS ANITA MANDAL HOUSE AT GOPALPUR _CFC1 |
Plinth level |
-
latitude : 24.975024964660406,24.9747254
Longitude : 88.1546333245933,88.1573046
file name : Image_21052024150712068.png
|
2024-05-21 15:07:12.131752 |
161 |
34481225 |
CONSTRUCTION OF CC ROAD FROM RABI SAHANI HOUSE TOWARDS ANITA MANDAL HOUSE AT GOPALPUR _CFC |
150000 |
CONSTRUCTION OF CC ROAD FROM RABI SAHANI HOUSE TOWARDS ANITA MANDAL HOUSE AT GOPALPUR _CFC1 |
Completion of work |
-
latitude : 24.972562906332314,24.972555530257523
Longitude : 88.1604206096381,88.16068036481738
file name : Image_10032021125332069.png
|
2021-03-10 12:53:32.169032 |
162 |
34481225 |
CONSTRUCTION OF CC ROAD FROM RABI SAHANI HOUSE TOWARDS ANITA MANDAL HOUSE AT GOPALPUR _CFC |
150000 |
CONSTRUCTION OF CC ROAD FROM RABI SAHANI HOUSE TOWARDS ANITA MANDAL HOUSE AT GOPALPUR _CFC1 |
Completion of work |
-
latitude : 24.9753222,24.9746367
Longitude : 88.1575376,88.157335
file name : Image_10032021134201108.png
|
2021-03-10 13:42:01.194133 |
163 |
34485863 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KALI MANDIR TOWARDS OLD _CFC |
250000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KALI MANDIR TOWARDS OLD _CFC1 |
Completion of work |
-
latitude : 24.975699917413294,24.9750941
Longitude : 88.15378591418266,88.1539571
file name : Image_18032021125428016.png
|
2021-03-18 12:54:28.168675 |
164 |
39053753 |
CONSTRUCTION OF DRAIN WITH COVER FROM KALI MANDIRTOWARDS JITEN DAS HOUSE AT KANCHANTAR CFC |
350000 |
CONSTRUCTION OF DRAIN WITH COVER FROM KALI MANDIRTOWARDS JITEN DAS HOUSE AT KANCHANTAR CFC1 |
Completion of work |
-
latitude : 24.930191547609866,24.9294319
Longitude : 88.1290674302727,88.128949
file name : Image_04072022132009073.png
|
2022-07-04 13:20:09.184849 |
165 |
34494182 |
CONSTRUCTION OF CC ROAD FROM MOTI SK HOUSE TOWARDS MEHEDI HOSSAIN HOUSE AT KRISHNAPUR _CFC |
300000 |
CONSTRUCTION OF CC ROAD FROM MOTI SK HOUSE TOWARDS MEHEDI HOSSAIN HOUSE AT KRISHNAPUR _CFC1 |
Roof laid |
-
latitude : 24.95613655541092,24.955953494645655
Longitude : 88.15781752578914,88.15779070369899
file name : Image_30052024155706792.png
|
2024-05-30 15:57:06.868543 |
166 |
34494182 |
CONSTRUCTION OF CC ROAD FROM MOTI SK HOUSE TOWARDS MEHEDI HOSSAIN HOUSE AT KRISHNAPUR _CFC |
300000 |
CONSTRUCTION OF CC ROAD FROM MOTI SK HOUSE TOWARDS MEHEDI HOSSAIN HOUSE AT KRISHNAPUR _CFC1 |
Plinth level |
-
latitude : 24.956134501844645,24.95597256347537
Longitude : 88.15779665485024,88.15777050331235
file name : Image_30052024155217696.png
|
2024-05-30 15:52:17.785234 |
167 |
34494182 |
CONSTRUCTION OF CC ROAD FROM MOTI SK HOUSE TOWARDS MEHEDI HOSSAIN HOUSE AT KRISHNAPUR _CFC |
300000 |
CONSTRUCTION OF CC ROAD FROM MOTI SK HOUSE TOWARDS MEHEDI HOSSAIN HOUSE AT KRISHNAPUR _CFC1 |
Completion of work |
-
latitude : 24.956061956472695,24.95567370671779
Longitude : 88.157780142501,88.1577111594379
file name : Image_20092021135526349.png
|
2021-09-20 13:55:26.437228 |
168 |
39055746 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JITEN MANDAL HOUSE CFC |
350000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JITEN MANDAL HOUSE CFC1 |
Roof laid |
-
latitude : 24.96821408160031,24.96817036997527
Longitude : 88.14955414272845,88.14958113245666
file name : Image_29052024151624905.png
|
2024-05-29 15:16:24.99358 |
169 |
39055746 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JITEN MANDAL HOUSE CFC |
350000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JITEN MANDAL HOUSE CFC1 |
Plinth level |
-
latitude : 24.9682836,24.96847823727876
Longitude : 88.1492713,88.14928567036986
file name : Image_29052024150732817.png
|
2024-05-29 15:07:32.891833 |
170 |
39055746 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JITEN MANDAL HOUSE CFC |
350000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JITEN MANDAL HOUSE CFC1 |
Completion of work |
-
latitude : 24.968227702192962,24.967936892062426
Longitude : 88.14944878220558,88.14971842803061
file name : Image_01022022174325109.png
|
2022-02-01 17:43:25.190148 |
171 |
34493919 |
CONS OF CC ROAD FROM PUKURPARA TOWARDS LATIKA HOUSE TOWARDS SATTAR HOUSE AT KRISHNAPUR _CFC |
300000 |
CONS OF CC ROAD FROM PUKURPARA TOWARDS LATIKA HOUSE TOWARDS SATTAR HOUSE AT KRISHNAPUR _CFC1 |
Roof laid |
-
latitude : 24.96039682533592,24.960396867245436
Longitude : 88.15760219469666,88.15737479366362
file name : Image_30052024164554276.png
|
2024-05-30 16:45:54.345922 |
172 |
34493919 |
CONS OF CC ROAD FROM PUKURPARA TOWARDS LATIKA HOUSE TOWARDS SATTAR HOUSE AT KRISHNAPUR _CFC |
300000 |
CONS OF CC ROAD FROM PUKURPARA TOWARDS LATIKA HOUSE TOWARDS SATTAR HOUSE AT KRISHNAPUR _CFC1 |
Plinth level |
-
latitude : 24.960379265248775,24.96036556083709
Longitude : 88.15758149139583,88.15742885693908
file name : Image_30052024164044453.png
|
2024-05-30 16:40:44.524225 |
173 |
34493919 |
CONS OF CC ROAD FROM PUKURPARA TOWARDS LATIKA HOUSE TOWARDS SATTAR HOUSE AT KRISHNAPUR _CFC |
300000 |
CONS OF CC ROAD FROM PUKURPARA TOWARDS LATIKA HOUSE TOWARDS SATTAR HOUSE AT KRISHNAPUR _CFC1 |
Completion of work |
-
latitude : 24.960370799526572,24.960365602746606
Longitude : 88.15764200873673,88.15677816979587
file name : Image_08112021142106434.png
|
2021-11-08 14:21:06.521909 |
174 |
34485510 |
CONS OF CC ROAD FROM PURNIMA TOWARDS HAREN HOUSE NAKUL _CFC |
200000 |
CONS OF CC ROAD FROM PURNIMA TOWARDS HAREN HOUSE NAKUL _CFC1 |
Completion of work |
-
latitude : 24.974082545377314,24.974246034398675
Longitude : 88.15438689664006,88.1541988067329
file name : Image_19012022150033717.png
|
2022-01-19 15:00:33.807839 |
175 |
34465193 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KUTUB HOUSE TOWARDS KAYUM HOUSE AT MOSLEMPUR _CFC |
250000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KUTUB HOUSE TOWARDS KAYUM HOUSE AT MOSLEMPUR _CFC1 |
Roof laid |
-
latitude : 24.93787528015673,24.937847452238202
Longitude : 88.15548132173717,88.15554259344935
file name : Image_19092024131006034.png
|
2024-09-19 13:10:06.097007 |
176 |
34465193 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KUTUB HOUSE TOWARDS KAYUM HOUSE AT MOSLEMPUR _CFC |
250000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KUTUB HOUSE TOWARDS KAYUM HOUSE AT MOSLEMPUR _CFC1 |
Plinth level |
-
latitude : 24.93789300788194,24.937834544107318
Longitude : 88.1554969958961,88.15555659122765
file name : Image_19092024130506103.png
|
2024-09-19 13:05:06.170237 |
177 |
34465193 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KUTUB HOUSE TOWARDS KAYUM HOUSE AT MOSLEMPUR _CFC |
250000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KUTUB HOUSE TOWARDS KAYUM HOUSE AT MOSLEMPUR _CFC1 |
Completion of work |
-
latitude : 24.9370046,24.9370046
Longitude : 88.1556953,88.1556953
file name : Image_28102021123200847.png
|
2021-10-28 12:32:00.941118 |
178 |
34465193 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KUTUB HOUSE TOWARDS KAYUM HOUSE AT MOSLEMPUR _CFC |
250000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KUTUB HOUSE TOWARDS KAYUM HOUSE AT MOSLEMPUR _CFC1 |
Completion of work |
-
latitude : 24.940465916879475,24.94024652056396
Longitude : 88.15653040073812,88.15646711736917
file name : Image_21092021154547567.png
|
2021-09-21 15:45:47.652399 |
179 |
34480083 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM MOFAJUL HOUSE TOWARDS AT FULBARI CFC |
350000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM MOFAJUL HOUSE TOWARDS AT FULBARI CFC1 |
Plinth level |
-
latitude : 24.9563458096236,24.9559713
Longitude : 88.12724629417062,88.1255173
file name : Image_16012023132118603.png
|
2023-01-16 13:21:18.680447 |
180 |
34480083 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM MOFAJUL HOUSE TOWARDS AT FULBARI CFC |
350000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM MOFAJUL HOUSE TOWARDS AT FULBARI CFC1 |
Plinth level |
-
latitude : 24.9559239,24.9559242
Longitude : 88.1253888,88.1253961
file name : Image_02022023144150642.png
|
2023-02-02 14:41:50.724428 |
181 |
34480479 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JAKKAR ALI HOUSE TOWARDS MANIK SK HOUSE AT FULBARI _CFC |
350001 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JAKKAR ALI HOUSE TOWARDS MANIK SK HOUSE AT FULBARI _CFC1 |
Completion of work |
-
latitude : 24.9559237,24.955268064513803
Longitude : 88.1253899,88.12749247066677
file name : Image_02022023144432674.png
|
2023-02-02 14:44:32.754054 |
182 |
34480479 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JAKKAR ALI HOUSE TOWARDS MANIK SK HOUSE AT FULBARI _CFC |
350001 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JAKKAR ALI HOUSE TOWARDS MANIK SK HOUSE AT FULBARI _CFC1 |
Completion of work |
-
latitude : 24.956090203486383,24.95627355761826
Longitude : 88.12728468328714,88.12723766081035
file name : Image_16012023132114760.png
|
2023-01-16 13:21:14.832496 |
183 |
86837741 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 24.97466110624373
Longitude : 88.15325114876032
file name : Image_28062024145708607.png
|
2024-06-28 14:57:08.686458 |
184 |
86837741 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.974664668552577
Longitude : 88.1532431859523
file name : Image_28062024145059200.png
|
2024-06-28 14:50:59.272279 |
185 |
86837741 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.974669362418354
Longitude : 88.15325140021741
file name : Image_28062024144352049.png
|
2024-06-28 14:43:52.118894 |
186 |
39119538 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM RAIPUR MADHU MANDAL HOUSE RAIPUR _CFC. |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM RAIPUR MADHU MANDAL HOUSE RAIPUR _CFC.1 |
Roof laid |
-
latitude : 24.964358154684305,24.964457186870277
Longitude : 88.16768663004041,88.16764044575393
file name : Image_24052024153229216.png
|
2024-05-24 15:32:29.294002 |
187 |
39119538 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM RAIPUR MADHU MANDAL HOUSE RAIPUR _CFC. |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM RAIPUR MADHU MANDAL HOUSE RAIPUR _CFC.1 |
Plinth level |
-
latitude : 24.96430275030434,24.964440297335386
Longitude : 88.16776500083506,88.16762913018465
file name : Image_24052024152421412.png
|
2024-05-24 15:24:21.48386 |
188 |
39119538 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM RAIPUR MADHU MANDAL HOUSE RAIPUR _CFC. |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM RAIPUR MADHU MANDAL HOUSE RAIPUR _CFC.1 |
Plinth level |
-
latitude : 24.96438066009432,24.964446206577122
Longitude : 88.16768093034625,88.16763013601303
file name : Image_24052024152637249.png
|
2024-05-24 15:26:37.320256 |
189 |
39119538 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM RAIPUR MADHU MANDAL HOUSE RAIPUR _CFC. |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM RAIPUR MADHU MANDAL HOUSE RAIPUR _CFC.1 |
Completion of work |
-
latitude : 24.964792211540043,24.96442022267729
Longitude : 88.1673882342875,88.16759375855327
file name : Image_26022021132403158.png
|
2021-02-26 13:24:03.230164 |
190 |
46949069 |
Construction of Cement Concrete Road from Biren Mandal's House towards Akil Mandal's House at Raipur |
400000 |
Construction of Cement Concrete Road from Biren Mandal's House towards Akil Mandal's House at Raipur1 |
Plinth level |
-
latitude : 24.964247345924377,24.964244454167783
Longitude : 88.16772887483239,88.16820974461734
file name : Image_24052024154116835.png
|
2024-05-24 15:41:16.932039 |
191 |
46949069 |
Construction of Cement Concrete Road from Biren Mandal's House towards Akil Mandal's House at Raipur |
400000 |
Construction of Cement Concrete Road from Biren Mandal's House towards Akil Mandal's House at Raipur1 |
Completion of work |
-
latitude : 24.96416859794408,24.964177357032895
Longitude : 88.16815710626543,88.1679514143616
file name : Image_24052024153815823.png
|
2024-05-24 15:38:15.892468 |
192 |
46949069 |
Construction of Cement Concrete Road from Biren Mandal's House towards Akil Mandal's House at Raipur |
400000 |
Construction of Cement Concrete Road from Biren Mandal's House towards Akil Mandal's House at Raipur1 |
Completion of work |
-
latitude : 24.964193827472627,24.96410011779517
Longitude : 88.1677494943142,88.16791419871151
file name : Image_02052022123805919.png
|
2022-05-02 12:38:06.026066 |
193 |
34492379 |
CONSTRUCTION OF PUCCA DRAIN FROM TEEN MOHONI WATER TANK TOWARDS PAHARIPARA POND AT KUMARPUR _CFC |
350000 |
CONSTRUCTION OF PUCCA DRAIN FROM TEEN MOHONI WATER TANK TOWARDS PAHARIPARA POND AT KUMARPUR _CFC1 |
Roof laid |
-
latitude : 24.95402615983039,24.954046150669456
Longitude : 88.17232307977974,88.17217472009361
file name : Image_24052024161430451.png
|
2024-05-24 16:14:30.522388 |
194 |
34492379 |
CONSTRUCTION OF PUCCA DRAIN FROM TEEN MOHONI WATER TANK TOWARDS PAHARIPARA POND AT KUMARPUR _CFC |
350000 |
CONSTRUCTION OF PUCCA DRAIN FROM TEEN MOHONI WATER TANK TOWARDS PAHARIPARA POND AT KUMARPUR _CFC1 |
Plinth level |
-
latitude : 24.95404531247914,24.95404753368348
Longitude : 88.1723324675113,88.17219089716673
file name : Image_24052024155551130.png
|
2024-05-24 15:55:51.206197 |
195 |
34492379 |
CONSTRUCTION OF PUCCA DRAIN FROM TEEN MOHONI WATER TANK TOWARDS PAHARIPARA POND AT KUMARPUR _CFC |
350000 |
CONSTRUCTION OF PUCCA DRAIN FROM TEEN MOHONI WATER TANK TOWARDS PAHARIPARA POND AT KUMARPUR _CFC1 |
Completion of work |
-
latitude : 24.954067482613027,24.95402213651687
Longitude : 88.17198528908193,88.17230891436338
file name : Image_26022021133144942.png
|
2021-02-26 13:31:45.036511 |
196 |
46840047 |
Construction of cement concrete drain from Dhiren Mandal's House towards Khoka's house at Konabari. |
700000 |
Construction of cement concrete drain from Dhiren Mandal's House towards Khoka's house at Konabari.1 |
Roof laid |
-
latitude : 24.95903166476637,24.959080908447504
Longitude : 88.13042580150068,88.13047198578715
file name : Image_20052024141514665.png
|
2024-05-20 14:15:14.735892 |
197 |
46840047 |
Construction of cement concrete drain from Dhiren Mandal's House towards Khoka's house at Konabari. |
700000 |
Construction of cement concrete drain from Dhiren Mandal's House towards Khoka's house at Konabari.1 |
Plinth level |
-
latitude : 24.9598596,24.959017541259527
Longitude : 88.1311214,88.13044399023056
file name : Image_20052024141231183.png
|
2024-05-20 14:12:31.251455 |
198 |
46840047 |
Construction of cement concrete drain from Dhiren Mandal's House towards Khoka's house at Konabari. |
700000 |
Construction of cement concrete drain from Dhiren Mandal's House towards Khoka's house at Konabari.1 |
Plinth level |
-
latitude : 24.959062258712947,24.95917373802513
Longitude : 88.13045999966562,88.1306438986212
file name : Image_16012023132536846.png
|
2023-01-16 13:25:36.931569 |
199 |
46847284 |
Construction of cc road from Tumpa Saha house towards Surajit Basak house at Gopalpur |
150000 |
Construction of cc road from Tumpa Saha house towards Surajit Basak house at Gopalpur1 |
Plinth level |
-
latitude : 24.96143739670515,24.961509690620005
Longitude : 88.12560813501477,88.12557737343013
file name : Image_20052024143245903.png
|
2024-05-20 14:32:45.980921 |
200 |
46847284 |
Construction of cc road from Tumpa Saha house towards Surajit Basak house at Gopalpur |
150000 |
Construction of cc road from Tumpa Saha house towards Surajit Basak house at Gopalpur1 |
Completion of work |
-
latitude : 24.9608835,24.961477336473763
Longitude : 88.1255729,88.12563311308622
file name : Image_20052024142855544.png
|
2024-05-20 14:28:55.61296 |
201 |
46847284 |
Construction of cc road from Tumpa Saha house towards Surajit Basak house at Gopalpur |
150000 |
Construction of cc road from Tumpa Saha house towards Surajit Basak house at Gopalpur1 |
Completion of work |
-
latitude : 24.9743772,24.9743838
Longitude : 88.1562842,88.1562911
file name : Image_06062022153308378.png
|
2022-06-06 15:33:08.450877 |
202 |
34462497 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KHALED HOUSE TOWARDS SAPATU HOUSE AT KONABARI CFC |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KHALED HOUSE TOWARDS SAPATU HOUSE AT KONABARI CFC1 |
Roof laid |
-
latitude : 24.961491166613996,24.961476582102478
Longitude : 88.12895896844566,88.12914714217186
file name : Image_20052024144427943.png
|
2024-05-20 14:44:28.022339 |
203 |
34462497 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KHALED HOUSE TOWARDS SAPATU HOUSE AT KONABARI CFC |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KHALED HOUSE TOWARDS SAPATU HOUSE AT KONABARI CFC1 |
Plinth level |
-
latitude : 24.961497872136533,24.961480018682778
Longitude : 88.12913658097386,88.12911378219724
file name : Image_20052024143854831.png
|
2024-05-20 14:38:54.914842 |
204 |
34462497 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KHALED HOUSE TOWARDS SAPATU HOUSE AT KONABARI CFC |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KHALED HOUSE TOWARDS SAPATU HOUSE AT KONABARI CFC1 |
Completion of work |
-
latitude : 24.96141342446208,24.96148919686675
Longitude : 88.12908603809774,88.12918284907937
file name : Image_22112021125218968.png
|
2021-11-22 12:52:19.069659 |
205 |
34462497 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KHALED HOUSE TOWARDS SAPATU HOUSE AT KONABARI CFC |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KHALED HOUSE TOWARDS SAPATU HOUSE AT KONABARI CFC1 |
Completion of work |
-
latitude : 24.961313805542886,24.961443222127855
Longitude : 88.12918955460191,88.12913649715483
file name : Image_22112021125223699.png
|
2021-11-22 12:52:23.795473 |
206 |
34485191 |
CONS OF CC ROAD FROM ANIL TOWARDS RAJKUMAR MANDAL HOUSE MANDIR TOWARDS PULAK HOUSE_CFC |
200000 |
CONS OF CC ROAD FROM ANIL TOWARDS RAJKUMAR MANDAL HOUSE MANDIR TOWARDS PULAK HOUSE_CFC1 |
Roof laid |
-
latitude : 24.9745468609035,24.9745114473626
Longitude : 88.14917284995317,88.1491337902844
file name : Image_20052024150818075.png
|
2024-05-20 15:08:18.148858 |
207 |
34485191 |
CONS OF CC ROAD FROM ANIL TOWARDS RAJKUMAR MANDAL HOUSE MANDIR TOWARDS PULAK HOUSE_CFC |
200000 |
CONS OF CC ROAD FROM ANIL TOWARDS RAJKUMAR MANDAL HOUSE MANDIR TOWARDS PULAK HOUSE_CFC1 |
Plinth level |
-
latitude : 24.97450679540634,24.97457561083138
Longitude : 88.1491560023278,88.14916220493615
file name : Image_20052024150359172.png
|
2024-05-20 15:03:59.25054 |
208 |
34485191 |
CONS OF CC ROAD FROM ANIL TOWARDS RAJKUMAR MANDAL HOUSE MANDIR TOWARDS PULAK HOUSE_CFC |
200000 |
CONS OF CC ROAD FROM ANIL TOWARDS RAJKUMAR MANDAL HOUSE MANDIR TOWARDS PULAK HOUSE_CFC1 |
Completion of work |
-
latitude : 24.974524942226708,24.9760398
Longitude : 88.14905097708106,88.1506388
file name : Image_11012021152835407.png
|
2021-01-11 15:28:35.487741 |
209 |
46965134 |
Construction of cement concrete road from Islam Sekh's House towards Serajul Sekh's House at Kumarpu |
200000 |
Construction of cement concrete road from Islam Sekh's House towards Serajul Sekh's House at Kumarpu1 |
Plinth level |
-
latitude : 24.95584943331778,24.955840464681387
Longitude : 88.17471980117261,88.17489850334823
file name : Image_24052024165250070.png
|
2024-05-24 16:52:50.145114 |
210 |
46965134 |
Construction of cement concrete road from Islam Sekh's House towards Serajul Sekh's House at Kumarpu |
200000 |
Construction of cement concrete road from Islam Sekh's House towards Serajul Sekh's House at Kumarpu1 |
Completion of work |
-
latitude : 24.955880027264357,24.955830490216613
Longitude : 88.1747964117676,88.17498684860766
file name : Image_24052024163543048.png
|
2024-05-24 16:35:43.131625 |
211 |
46965134 |
Construction of cement concrete road from Islam Sekh's House towards Serajul Sekh's House at Kumarpu |
200000 |
Construction of cement concrete road from Islam Sekh's House towards Serajul Sekh's House at Kumarpu1 |
Completion of work |
-
latitude : 24.955337,24.9553395
Longitude : 88.1745849,88.174589
file name : Image_25112022134327255.png
|
2022-11-25 13:43:27.33702 |
212 |
34492726 |
CONSTRUCTION OF CC ROAD WITH SLAB CULVERT FROM GHORAPIR GHAT ROAD AT KUMARPUR _CFC |
250000 |
CONSTRUCTION OF CC ROAD WITH SLAB CULVERT FROM GHORAPIR GHAT ROAD AT KUMARPUR _CFC1 |
Roof laid |
-
latitude : 24.95540862902999,24.95554035063833
Longitude : 88.17676397971809,88.17697796970606
file name : Image_24052024165904415.png
|
2024-05-24 16:59:04.490575 |
213 |
34492726 |
CONSTRUCTION OF CC ROAD WITH SLAB CULVERT FROM GHORAPIR GHAT ROAD AT KUMARPUR _CFC |
250000 |
CONSTRUCTION OF CC ROAD WITH SLAB CULVERT FROM GHORAPIR GHAT ROAD AT KUMARPUR _CFC1 |
Plinth level |
-
latitude : 24.97867348138243,24.954010108485818,24.954545754007995
Longitude : 88.15418866463006,88.17804423160851,88.17757383920252
file name : Image_25012021152512612.png
|
2021-01-25 15:25:12.680964 |
214 |
46847705 |
Construction of cc road from Pintu Sk house towards Sabir Shop at Maheshpur |
200000 |
Construction of cc road from Pintu Sk house towards Sabir Shop at Maheshpur1 |
Roof laid |
-
latitude : 24.9738676,24.9739907
Longitude : 88.1543375,88.154375
file name : Image_21052024143414800.png
|
2024-05-21 14:34:14.908654 |
215 |
46847705 |
Construction of cc road from Pintu Sk house towards Sabir Shop at Maheshpur |
200000 |
Construction of cc road from Pintu Sk house towards Sabir Shop at Maheshpur1 |
Plinth level |
-
latitude : 24.973919,24.9740474
Longitude : 88.1543409,88.1543509
file name : Image_21052024143135967.png
|
2024-05-21 14:31:36.103078 |
216 |
46847705 |
Construction of cc road from Pintu Sk house towards Sabir Shop at Maheshpur |
200000 |
Construction of cc road from Pintu Sk house towards Sabir Shop at Maheshpur1 |
Completion of work |
-
latitude : 24.973927,24.9737712
Longitude : 88.1543501,88.1543334
file name : Image_21052024142403170.png
|
2024-05-21 14:24:03.247366 |
217 |
46847705 |
Construction of cc road from Pintu Sk house towards Sabir Shop at Maheshpur |
200000 |
Construction of cc road from Pintu Sk house towards Sabir Shop at Maheshpur1 |
Completion of work |
-
latitude : 24.9737203,24.97410412877798
Longitude : 88.1543803,88.1540812086314
file name : Image_21102022162658437.png
|
2022-10-21 16:26:58.530497 |
218 |
34482796 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER FROM BUDHHA HOUSE TOWARDS PRIMARY SCHOOL AT GOPALPUR_CFC |
200000 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER FROM BUDHHA HOUSE TOWARDS PRIMARY SCHOOL AT GOPALPUR_CFC1 |
Roof laid |
-
latitude : 24.9748331,24.9748609
Longitude : 88.1546479,88.1545617
file name : Image_21052024144645779.png
|
2024-05-21 14:46:45.853111 |
219 |
34482796 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER FROM BUDHHA HOUSE TOWARDS PRIMARY SCHOOL AT GOPALPUR_CFC |
200000 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER FROM BUDHHA HOUSE TOWARDS PRIMARY SCHOOL AT GOPALPUR_CFC1 |
Plinth level |
-
latitude : 24.9749432,24.9747655
Longitude : 88.1545155,88.1545419
file name : Image_21052024144111620.png
|
2024-05-21 14:41:11.845263 |
220 |
34482796 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER FROM BUDHHA HOUSE TOWARDS PRIMARY SCHOOL AT GOPALPUR_CFC |
200000 |
CONSTRUCTION OF PUCCA DRAIN WITH RCC COVER FROM BUDHHA HOUSE TOWARDS PRIMARY SCHOOL AT GOPALPUR_CFC1 |
Completion of work |
-
latitude : 24.9753262,24.9748213
Longitude : 88.154566,88.1545496
file name : Image_16092021110950918.png
|
2021-09-16 11:09:50.988383 |
221 |
34483202 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KOYEL DAS HOUSE TOWARDS FULKUMAR _CFC |
250000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KOYEL DAS HOUSE TOWARDS FULKUMAR _CFC1 |
Roof laid |
-
latitude : 24.9748009,24.9748113
Longitude : 88.1557502,88.1557085
file name : Image_21052024145633731.png
|
2024-05-21 14:56:33.983086 |
222 |
34483202 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KOYEL DAS HOUSE TOWARDS FULKUMAR _CFC |
250000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KOYEL DAS HOUSE TOWARDS FULKUMAR _CFC1 |
Plinth level |
-
latitude : 24.9747746,24.9748019
Longitude : 88.1557026,88.15575
file name : Image_21052024145158747.png
|
2024-05-21 14:51:58.830369 |
223 |
34483202 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KOYEL DAS HOUSE TOWARDS FULKUMAR _CFC |
250000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM KOYEL DAS HOUSE TOWARDS FULKUMAR _CFC1 |
Completion of work |
-
latitude : 24.9751804,24.975330610759556
Longitude : 88.1539203,88.15459032543004
file name : Image_02022021133646449.png
|
2021-02-02 13:36:46.533755 |
224 |
34481647 |
CONSTRUCTION OF CC ROAD FROM BISTU HALDAR HOUSE TOWARDS BIKASH HALDAR HOUSE AT GOPALPUR _CFC |
150000 |
CONSTRUCTION OF CC ROAD FROM BISTU HALDAR HOUSE TOWARDS BIKASH HALDAR HOUSE AT GOPALPUR _CFC1 |
Roof laid |
-
latitude : 24.97304029762745,24.972896589897573
Longitude : 88.15757176838815,88.15759507007897
file name : Image_21052024154749756.png
|
2024-05-21 15:47:49.827883 |
225 |
34481647 |
CONSTRUCTION OF CC ROAD FROM BISTU HALDAR HOUSE TOWARDS BIKASH HALDAR HOUSE AT GOPALPUR _CFC |
150000 |
CONSTRUCTION OF CC ROAD FROM BISTU HALDAR HOUSE TOWARDS BIKASH HALDAR HOUSE AT GOPALPUR _CFC1 |
Plinth level |
-
latitude : 24.973046919330955,24.972942983731627
Longitude : 88.15755123272538,88.15757813863456
file name : Image_21052024154217577.png
|
2024-05-21 15:42:17.650658 |
226 |
34481647 |
CONSTRUCTION OF CC ROAD FROM BISTU HALDAR HOUSE TOWARDS BIKASH HALDAR HOUSE AT GOPALPUR _CFC |
150000 |
CONSTRUCTION OF CC ROAD FROM BISTU HALDAR HOUSE TOWARDS BIKASH HALDAR HOUSE AT GOPALPUR _CFC1 |
Plinth level |
-
latitude : 24.973036819137633,24.972943696193397
Longitude : 88.15755542367697,88.15757654607296
file name : Image_21052024154050094.png
|
2024-05-21 15:40:50.175245 |
227 |
34481647 |
CONSTRUCTION OF CC ROAD FROM BISTU HALDAR HOUSE TOWARDS BIKASH HALDAR HOUSE AT GOPALPUR _CFC |
150000 |
CONSTRUCTION OF CC ROAD FROM BISTU HALDAR HOUSE TOWARDS BIKASH HALDAR HOUSE AT GOPALPUR _CFC1 |
Completion of work |
-
latitude : 24.972295816987753,24.972305917181075
Longitude : 88.15734746865928,88.15735459327698
file name : Image_16112021131051077.png
|
2021-11-16 13:10:51.166298 |
228 |
46846890 |
Construction of cc road from Bhutni's house towards Pritam'S house at Gopalpur |
200000 |
Construction of cc road from Bhutni's house towards Pritam'S house at Gopalpur1 |
Plinth level |
-
latitude : 24.974852,24.9740238
Longitude : 88.1545311,88.1543646
file name : Image_21052024161209714.png
|
2024-05-21 16:12:10.330085 |
229 |
46846890 |
Construction of cc road from Bhutni's house towards Pritam'S house at Gopalpur |
200000 |
Construction of cc road from Bhutni's house towards Pritam'S house at Gopalpur1 |
Plinth level |
-
latitude : 24.9739444,24.9748169
Longitude : 88.1543557,88.1545872
file name : Image_21052024160156026.png
|
2024-05-21 16:01:56.101568 |
230 |
46846890 |
Construction of cc road from Bhutni's house towards Pritam'S house at Gopalpur |
200000 |
Construction of cc road from Bhutni's house towards Pritam'S house at Gopalpur1 |
Completion of work |
-
latitude : 24.9748152,24.9740416
Longitude : 88.1545121,88.1543516
file name : Image_21052024155758197.png
|
2024-05-21 15:57:58.269358 |
231 |
46846890 |
Construction of cc road from Bhutni's house towards Pritam'S house at Gopalpur |
200000 |
Construction of cc road from Bhutni's house towards Pritam'S house at Gopalpur1 |
Completion of work |
-
latitude : 24.974859463982284,24.972955472767353
Longitude : 88.15747076645494,88.157571349293
file name : Image_21052024152759180.png
|
2024-05-21 15:27:59.271675 |
232 |
46846890 |
Construction of cc road from Bhutni's house towards Pritam'S house at Gopalpur |
200000 |
Construction of cc road from Bhutni's house towards Pritam'S house at Gopalpur1 |
Completion of work |
-
latitude : 24.9738037,24.9748245
Longitude : 88.1543954,88.154527
file name : Image_01112022144153768.png
|
2022-11-01 14:41:53.851527 |
233 |
46965075 |
Construction of cc road from Anil Roy house towards Mahanda River house at Raipur |
300000 |
Construction of cc road from Anil Roy house towards Mahanda River house at Raipur1 |
Roof laid |
-
latitude : 24.968080264516175,24.96809690259397
Longitude : 88.16384587436914,88.1639932282269
file name : Image_24052024151752077.png
|
2024-05-24 15:17:52.14569 |
234 |
46965075 |
Construction of cc road from Anil Roy house towards Mahanda River house at Raipur |
300000 |
Construction of cc road from Anil Roy house towards Mahanda River house at Raipur1 |
Plinth level |
-
latitude : 24.96806018985808,24.968096064403653
Longitude : 88.16385199315846,88.16397906281054
file name : Image_24052024151105763.png
|
2024-05-24 15:11:05.83547 |
235 |
46965075 |
Construction of cc road from Anil Roy house towards Mahanda River house at Raipur |
300000 |
Construction of cc road from Anil Roy house towards Mahanda River house at Raipur1 |
Plinth level |
-
latitude : 24.96775999199599,24.96820838190615
Longitude : 88.16317565739155,88.16430469974875
file name : Image_16022023134530434.png
|
2023-02-16 13:45:30.527054 |
236 |
34489209 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JAHARATALA PRY SCHOOL TOWARDS KARTIK HOUSE_CFC. |
300000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JAHARATALA PRY SCHOOL TOWARDS KARTIK HOUSE_CFC.1 |
Roof laid |
-
latitude : 24.96069589164108,24.960416774265468
Longitude : 88.16208064556122,88.16215993836522
file name : Image_28052024151644467.png
|
2024-05-28 15:16:44.56837 |
237 |
34489209 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JAHARATALA PRY SCHOOL TOWARDS KARTIK HOUSE_CFC. |
300000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JAHARATALA PRY SCHOOL TOWARDS KARTIK HOUSE_CFC.1 |
Roof laid |
-
latitude : 24.96069589164108,24.960416774265468
Longitude : 88.16208064556122,88.16215993836522
file name : Image_28052024151114678.png
|
2024-05-28 15:11:14.776505 |
238 |
34489209 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JAHARATALA PRY SCHOOL TOWARDS KARTIK HOUSE_CFC. |
300000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JAHARATALA PRY SCHOOL TOWARDS KARTIK HOUSE_CFC.1 |
Plinth level |
-
latitude : 24.961921954527497,24.960537096485496
Longitude : 88.16204938106239,88.16212959587574
file name : Image_28052024150637560.png
|
2024-05-28 15:06:37.661129 |
239 |
34489209 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JAHARATALA PRY SCHOOL TOWARDS KARTIK HOUSE_CFC. |
300000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JAHARATALA PRY SCHOOL TOWARDS KARTIK HOUSE_CFC.1 |
Completion of work |
-
latitude : 24.960767808370292,24.960764371789992
Longitude : 88.1620211340487,88.16204527392983
file name : Image_22112021133517103.png
|
2021-11-22 13:35:17.219997 |
240 |
34489209 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JAHARATALA PRY SCHOOL TOWARDS KARTIK HOUSE_CFC. |
300000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JAHARATALA PRY SCHOOL TOWARDS KARTIK HOUSE_CFC.1 |
Completion of work |
-
latitude : 24.960798737592995,24.960748362354934
Longitude : 88.16201224923134,88.16205139271915
file name : Image_22112021133520440.png
|
2021-11-22 13:35:20.528983 |
241 |
34489209 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JAHARATALA PRY SCHOOL TOWARDS KARTIK HOUSE_CFC. |
300000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JAHARATALA PRY SCHOOL TOWARDS KARTIK HOUSE_CFC.1 |
Completion of work |
-
latitude : 24.960613287985325,24.960565008223057
Longitude : 88.16210679709911,88.1621123291552
file name : Image_22112021133523254.png
|
2021-11-22 13:35:23.329252 |
242 |
34489209 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JAHARATALA PRY SCHOOL TOWARDS KARTIK HOUSE_CFC. |
300000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM JAHARATALA PRY SCHOOL TOWARDS KARTIK HOUSE_CFC.1 |
Completion of work |
-
latitude : 24.96053663548082,24.9607725860551
Longitude : 88.16210562363267,88.16204594448209
file name : Image_22112021133526210.png
|
2021-11-22 13:35:26.29838 |
243 |
46980641 |
Construction of cement concrete road from Kartik Pahari's towards Sushil Pahari's House at Gobindapu |
350000 |
Construction of cement concrete road from Kartik Pahari's towards Sushil Pahari's House at Gobindapu1 |
Plinth level |
-
latitude : 24.95972036384046,24.959546816535294
Longitude : 88.16230452619493,88.16234735772014
file name : Image_28052024152554954.png
|
2024-05-28 15:25:55.034863 |
244 |
46980641 |
Construction of cement concrete road from Kartik Pahari's towards Sushil Pahari's House at Gobindapu |
350000 |
Construction of cement concrete road from Kartik Pahari's towards Sushil Pahari's House at Gobindapu1 |
Completion of work |
-
latitude : 24.959720741026103,24.95959735941142
Longitude : 88.16229480318725,88.1623184401542
file name : Image_28052024152229349.png
|
2024-05-28 15:22:29.430545 |
245 |
46980641 |
Construction of cement concrete road from Kartik Pahari's towards Sushil Pahari's House at Gobindapu |
350000 |
Construction of cement concrete road from Kartik Pahari's towards Sushil Pahari's House at Gobindapu1 |
Completion of work |
-
latitude : 24.960141512565315,24.960003839805722
Longitude : 88.16219673492014,88.16226504743099
file name : Image_02052022124552660.png
|
2022-05-02 12:45:52.775701 |
246 |
67587925 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.957684106193483,24.95761583559215
Longitude : 88.1740294676274,88.17396878264844
file name : Image_06122023133120055.png
|
2023-12-06 13:31:20.144862 |
247 |
67587925 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.957615919411182,24.95761432684958
Longitude : 88.17396551370621,88.1739710457623
file name : Image_06122023132324642.png
|
2023-12-06 13:23:24.708778 |
248 |
67587925 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.957141210325062,24.9570205
Longitude : 88.17373995669186,88.1740124
file name : Image_01122023124835782.png
|
2023-12-01 12:48:35.862328 |
249 |
67587925 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.957192046567798,24.9570912
Longitude : 88.1737358495593,88.1739198
file name : Image_01122023124832840.png
|
2023-12-01 12:48:32.924082 |
250 |
67649831 |
Drainage Construction |
170166 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.939928
Longitude : 88.1561708
file name : Image_29122023133721079.png
|
2023-12-29 13:37:21.145612 |
251 |
67649831 |
Drainage Construction |
170166 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.9395279
Longitude : 88.1557447
file name : Image_28122023141341279.png
|
2023-12-28 14:13:41.364757 |
252 |
67649831 |
Drainage Construction |
170166 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.9398252
Longitude : 88.1561335
file name : Image_15122023132201454.png
|
2023-12-15 13:22:01.524651 |
253 |
67649831 |
Drainage Construction |
170166 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.93985822889954
Longitude : 88.15641146153212
file name : Image_15122023130029742.png
|
2023-12-15 13:00:29.820592 |
254 |
67649831 |
Drainage Construction |
170166 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.93988622445613
Longitude : 88.15646259114146
file name : Image_13122023141956172.png
|
2023-12-13 14:19:56.244627 |
255 |
58148557 |
CONSTRUCTION OF CC DRAIN FROM SHANKAR SINGH HOUSE AT GOPALPUR |
300000 |
CONSTRUCTION OF CC DRAIN FROM SHANKAR SINGH HOUSE AT GOPALPUR1 |
Plinth level |
-
latitude : 24.9759878,24.976016501896083
Longitude : 88.1551866,88.15580955706537
file name : Image_05022024172923044.png
|
2024-02-05 17:29:23.117614 |
256 |
58148557 |
CONSTRUCTION OF CC DRAIN FROM SHANKAR SINGH HOUSE AT GOPALPUR |
300000 |
CONSTRUCTION OF CC DRAIN FROM SHANKAR SINGH HOUSE AT GOPALPUR1 |
Plinth level |
-
latitude : 24.9765252,24.9761228
Longitude : 88.1555751,88.1563677
file name : Image_05022024172415575.png
|
2024-02-05 17:24:15.642894 |
257 |
58148557 |
CONSTRUCTION OF CC DRAIN FROM SHANKAR SINGH HOUSE AT GOPALPUR |
300000 |
CONSTRUCTION OF CC DRAIN FROM SHANKAR SINGH HOUSE AT GOPALPUR1 |
Completion of work |
-
latitude : 24.97594844084233,24.9765604
Longitude : 88.15579648129642,88.1556137
file name : Image_01022024141047790.png
|
2024-02-01 14:10:47.855899 |
258 |
68400414 |
Water Supply to villages |
90000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 24.9552712
Longitude : 88.121406
file name : Image_28022024164014929.png
|
2024-02-28 16:40:15.037738 |
259 |
68400414 |
Water Supply to villages |
90000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.955269
Longitude : 88.1214055
file name : Image_28022024163602638.png
|
2024-02-28 16:36:02.757499 |
260 |
68400414 |
Water Supply to villages |
90000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.9552723
Longitude : 88.121403
file name : Image_28022024162535108.png
|
2024-02-28 16:25:35.183584 |
261 |
34488495 |
CONSTRUCTION OF CC ROAD FROM ALI NEWAJ HOUSE TOWARDS JANU SK HOUSE AT GOBINDAPUR _CFC |
150000 |
CONSTRUCTION OF CC ROAD FROM ALI NEWAJ HOUSE TOWARDS JANU SK HOUSE AT GOBINDAPUR _CFC1 |
Roof laid |
-
latitude : 24.952392023988068,24.95228477753699
Longitude : 88.16538244485855,88.16547095775604
file name : Image_28052024160732984.png
|
2024-05-28 16:07:33.067754 |
262 |
34488495 |
CONSTRUCTION OF CC ROAD FROM ALI NEWAJ HOUSE TOWARDS JANU SK HOUSE AT GOBINDAPUR _CFC |
150000 |
CONSTRUCTION OF CC ROAD FROM ALI NEWAJ HOUSE TOWARDS JANU SK HOUSE AT GOBINDAPUR _CFC1 |
Plinth level |
-
latitude : 24.9523704405874,24.952310593798757
Longitude : 88.16540817730129,88.16546919755638
file name : Image_28052024160118869.png
|
2024-05-28 16:01:18.970701 |
263 |
34488495 |
CONSTRUCTION OF CC ROAD FROM ALI NEWAJ HOUSE TOWARDS JANU SK HOUSE AT GOBINDAPUR _CFC |
150000 |
CONSTRUCTION OF CC ROAD FROM ALI NEWAJ HOUSE TOWARDS JANU SK HOUSE AT GOBINDAPUR _CFC1 |
Completion of work |
-
latitude : 24.9531118,24.9531154
Longitude : 88.1649151,88.1649226
file name : Image_02052022142101321.png
|
2022-05-02 14:21:01.417013 |
264 |
34488735 |
CONSTRUCTION OF CC ROAD FROM ABDUL SK HOUSE TOWARDS BABLU AKHTAR HOUSE AT GOBINDAPUR _CFC. |
150000 |
CONSTRUCTION OF CC ROAD FROM ABDUL SK HOUSE TOWARDS BABLU AKHTAR HOUSE AT GOBINDAPUR _CFC.1 |
Plinth level |
-
latitude : 24.9504782,24.9505704
Longitude : 88.1642073,88.164171
file name : Image_28052024161623505.png
|
2024-05-28 16:16:23.594153 |
265 |
34488735 |
CONSTRUCTION OF CC ROAD FROM ABDUL SK HOUSE TOWARDS BABLU AKHTAR HOUSE AT GOBINDAPUR _CFC. |
150000 |
CONSTRUCTION OF CC ROAD FROM ABDUL SK HOUSE TOWARDS BABLU AKHTAR HOUSE AT GOBINDAPUR _CFC.1 |
Plinth level |
-
latitude : 24.9504782,24.9505704
Longitude : 88.1642073,88.164171
file name : Image_28052024161347667.png
|
2024-05-28 16:13:47.884626 |
266 |
34488735 |
CONSTRUCTION OF CC ROAD FROM ABDUL SK HOUSE TOWARDS BABLU AKHTAR HOUSE AT GOBINDAPUR _CFC. |
150000 |
CONSTRUCTION OF CC ROAD FROM ABDUL SK HOUSE TOWARDS BABLU AKHTAR HOUSE AT GOBINDAPUR _CFC.1 |
Completion of work |
-
latitude : 24.9787541,24.9787541
Longitude : 88.1541541,88.1541541
file name : Image_04022021154220820.png
|
2021-02-04 15:42:20.909823 |
267 |
46980516 |
Construction of cement concrete road from Saju Sekh's towards Tajamul Sekh's House at Burujpara. |
150000 |
Construction of cement concrete road from Saju Sekh's towards Tajamul Sekh's House at Burujpara.1 |
Plinth level |
-
latitude : 24.960149978287518,24.960098303854465
Longitude : 88.15211808308959,88.1521765049547
file name : Image_30052024150835566.png
|
2024-05-30 15:08:35.635942 |
268 |
46980516 |
Construction of cement concrete road from Saju Sekh's towards Tajamul Sekh's House at Burujpara. |
150000 |
Construction of cement concrete road from Saju Sekh's towards Tajamul Sekh's House at Burujpara.1 |
Completion of work |
-
latitude : 24.960146374069154,24.960109745152295
Longitude : 88.15213895402849,88.15217005088925
file name : Image_30052024150111086.png
|
2024-05-30 15:01:11.151488 |
269 |
46980516 |
Construction of cement concrete road from Saju Sekh's towards Tajamul Sekh's House at Burujpara. |
150000 |
Construction of cement concrete road from Saju Sekh's towards Tajamul Sekh's House at Burujpara.1 |
Completion of work |
-
latitude : 24.960127850063145,24.960071272216737
Longitude : 88.1520845554769,88.15218606032431
file name : Image_02062022133318042.png
|
2022-06-02 13:33:18.129542 |
270 |
46983527 |
Construction of cement concrete road from Suman Singha's house towards Nowsad Sekh's House at Krishn |
300000 |
Construction of cement concrete road from Suman Singha's house towards Nowsad Sekh's House at Krishn1 |
Roof laid |
-
latitude : 24.954139944165945,24.95398609433323
Longitude : 88.15634423866868,88.15645161084831
file name : Image_30052024154150679.png
|
2024-05-30 15:41:50.748032 |
271 |
46983527 |
Construction of cement concrete road from Suman Singha's house towards Nowsad Sekh's House at Krishn |
300000 |
Construction of cement concrete road from Suman Singha's house towards Nowsad Sekh's House at Krishn1 |
Plinth level |
-
latitude : 24.954131855629385,24.953947789035738
Longitude : 88.15634557977319,88.15645588561893
file name : Image_30052024153608856.png
|
2024-05-30 15:36:08.927855 |
272 |
46983527 |
Construction of cement concrete road from Suman Singha's house towards Nowsad Sekh's House at Krishn |
300000 |
Construction of cement concrete road from Suman Singha's house towards Nowsad Sekh's House at Krishn1 |
Completion of work |
-
latitude : 24.951326264999807,24.954236
Longitude : 88.15813679248095,88.1561437
file name : Image_11112022124053364.png
|
2022-11-11 12:40:53.442578 |
273 |
46961724 |
Construction of cement concrete road from Main Road towards Bapi Sekh's House at Krishnapur. |
150000 |
Construction of cement concrete road from Main Road towards Bapi Sekh's House at Krishnapur.1 |
Roof laid |
-
latitude : 24.951332886703312,24.951291689649224
Longitude : 88.1581445876509,88.15795155242085
file name : Image_30052024162053037.png
|
2024-05-30 16:20:53.113767 |
274 |
46961724 |
Construction of cement concrete road from Main Road towards Bapi Sekh's House at Krishnapur. |
150000 |
Construction of cement concrete road from Main Road towards Bapi Sekh's House at Krishnapur.1 |
Plinth level |
-
latitude : 24.951190603896976,24.951282092370093
Longitude : 88.15775147639215,88.1579765304923
file name : Image_30052024161329420.png
|
2024-05-30 16:13:29.495947 |
275 |
46961724 |
Construction of cement concrete road from Main Road towards Bapi Sekh's House at Krishnapur. |
150000 |
Construction of cement concrete road from Main Road towards Bapi Sekh's House at Krishnapur.1 |
Completion of work |
-
latitude : 24.951344286091626,24.95121818035841
Longitude : 88.15813251771033,88.15782205201685
file name : Image_11112022123544076.png
|
2022-11-11 12:35:44.150794 |
276 |
67351679 |
Construction of roads |
300000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.974698,24.974295110441744
Longitude : 88.1573315,88.15718335099518
file name : Image_04122023155339164.png
|
2023-12-04 15:53:39.233695 |
277 |
67351679 |
Construction of roads |
300000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.9746948,24.9746996
Longitude : 88.1573337,88.157337
file name : Image_01122023124841621.png
|
2023-12-01 12:48:41.696446 |
278 |
67351679 |
Construction of roads |
300000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.9747326,24.9751595
Longitude : 88.1573506,88.1574376
file name : Image_28112023162845177.png
|
2023-11-28 16:28:45.258331 |
279 |
34459535 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM GAMBHIRA POND TOWARDS SANJAY MANDAL LAND AT AMJAMTALA CFC |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM GAMBHIRA POND TOWARDS SANJAY MANDAL LAND AT AMJAMTALA CFC1 |
Roof laid |
-
latitude : 24.9713943,24.9713868
Longitude : 88.1461217,88.1460887
file name : Image_29052024143655686.png
|
2024-05-29 14:36:55.762782 |
280 |
34459535 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM GAMBHIRA POND TOWARDS SANJAY MANDAL LAND AT AMJAMTALA CFC |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM GAMBHIRA POND TOWARDS SANJAY MANDAL LAND AT AMJAMTALA CFC1 |
Roof laid |
-
latitude : 24.9713923,24.9713934
Longitude : 88.146126,88.1461264
file name : Image_29052024143042700.png
|
2024-05-29 14:30:42.793495 |
281 |
34459535 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM GAMBHIRA POND TOWARDS SANJAY MANDAL LAND AT AMJAMTALA CFC |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM GAMBHIRA POND TOWARDS SANJAY MANDAL LAND AT AMJAMTALA CFC1 |
Plinth level |
-
latitude : 24.971454315818846,24.971468606963754
Longitude : 88.14532505348325,88.14505741931498
file name : Image_25012021154643162.png
|
2021-01-25 15:46:43.238649 |
282 |
34461006 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KRISHNA HOUSE TOWARDS BISWAJIT DUTTA HOUSE AT AMAMTALA CFC |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KRISHNA HOUSE TOWARDS BISWAJIT DUTTA HOUSE AT AMAMTALA CFC1 |
Roof laid |
-
latitude : 24.9706033,24.97063930146396
Longitude : 88.1475229,88.14808605238795
file name : Image_29052024150019134.png
|
2024-05-29 15:00:19.227557 |
283 |
34461006 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KRISHNA HOUSE TOWARDS BISWAJIT DUTTA HOUSE AT AMAMTALA CFC |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KRISHNA HOUSE TOWARDS BISWAJIT DUTTA HOUSE AT AMAMTALA CFC1 |
Plinth level |
-
latitude : 24.970604977570474,24.970591901801527,24.97065308969468
Longitude : 88.1479899957776,88.1479696277529,88.1481094378978
file name : Image_29052024145312241.png
|
2024-05-29 14:53:12.325678 |
284 |
34461006 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KRISHNA HOUSE TOWARDS BISWAJIT DUTTA HOUSE AT AMAMTALA CFC |
250000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM KRISHNA HOUSE TOWARDS BISWAJIT DUTTA HOUSE AT AMAMTALA CFC1 |
Completion of work |
-
latitude : 24.978851471096277,24.9705103
Longitude : 88.15410090610385,88.1475369
file name : Image_05012022143856119.png
|
2022-01-05 14:38:56.207794 |
285 |
58150535 |
EXPENDITURE FOR VBD CONTROLL ACTIVITY AND DRAIN CLEANING |
350830 |
EXPENDITURE FOR VBD CONTROLL ACTIVITY AND DRAIN CLEANING1 |
Completion of work |
-
latitude : 24.9760516
Longitude : 88.1553183
file name : Image_31052024142753174.png
|
2024-05-31 14:27:53.240873 |
286 |
46811937 |
Construction of cement concrete drain from Samrat Sekh's Land towards Tofajul Hoque's Land at Nisch |
2500000 |
Construction of cement concrete drain from Samrat Sekh's Land towards Tofajul Hoque's Land at Nisch1 |
Roof laid |
-
latitude : 24.95386489201337,24.953598976135254
Longitude : 88.15353034995496,88.15355365164578
file name : Image_30052024152911993.png
|
2024-05-30 15:29:12.074332 |
287 |
46811937 |
Construction of cement concrete drain from Samrat Sekh's Land towards Tofajul Hoque's Land at Nisch |
2500000 |
Construction of cement concrete drain from Samrat Sekh's Land towards Tofajul Hoque's Land at Nisch1 |
Plinth level |
-
latitude : 24.95387310627848,24.95387310627848
Longitude : 88.15352926030755,88.15352926030755
file name : Image_30052024152217656.png
|
2024-05-30 15:22:17.731951 |
288 |
46811937 |
Construction of cement concrete drain from Samrat Sekh's Land towards Tofajul Hoque's Land at Nisch |
2500000 |
Construction of cement concrete drain from Samrat Sekh's Land towards Tofajul Hoque's Land at Nisch1 |
Completion of work |
-
latitude : 24.953930689953268,24.95323398616165
Longitude : 88.1535161845386,88.15358340740204
file name : Image_06022023163400444.png
|
2023-02-06 16:34:00.530814 |
289 |
34487146 |
SINKING OF SUB MERSSBLE PUMP WITH WATER FILTER AT GOPALPUR SAHANI PARA AT JAHARATALA _CFC |
350000 |
SINKING OF SUB MERSSBLE PUMP WITH WATER FILTER AT GOPALPUR SAHANI PARA AT JAHARATALA _CFC1 |
Roof laid |
-
latitude : 24.9710217
Longitude : 88.1615553
file name : Image_28052024145747071.png
|
2024-05-28 14:57:47.177966 |
290 |
34487146 |
SINKING OF SUB MERSSBLE PUMP WITH WATER FILTER AT GOPALPUR SAHANI PARA AT JAHARATALA _CFC |
350000 |
SINKING OF SUB MERSSBLE PUMP WITH WATER FILTER AT GOPALPUR SAHANI PARA AT JAHARATALA _CFC1 |
Roof laid |
-
latitude : 24.9710217
Longitude : 88.1615553
file name : Image_28052024145415319.png
|
2024-05-28 14:54:15.415822 |
291 |
34487146 |
SINKING OF SUB MERSSBLE PUMP WITH WATER FILTER AT GOPALPUR SAHANI PARA AT JAHARATALA _CFC |
350000 |
SINKING OF SUB MERSSBLE PUMP WITH WATER FILTER AT GOPALPUR SAHANI PARA AT JAHARATALA _CFC1 |
Plinth level |
-
latitude : 24.9709895
Longitude : 88.161532
file name : Image_28052024144035788.png
|
2024-05-28 14:40:35.454444 |
292 |
34487146 |
SINKING OF SUB MERSSBLE PUMP WITH WATER FILTER AT GOPALPUR SAHANI PARA AT JAHARATALA _CFC |
350000 |
SINKING OF SUB MERSSBLE PUMP WITH WATER FILTER AT GOPALPUR SAHANI PARA AT JAHARATALA _CFC1 |
Completion of work |
-
latitude : 24.9710147
Longitude : 88.1614982
file name : Image_08032022133216380.png
|
2022-03-08 13:32:16.491582 |
293 |
34494526 |
CONSTRUCTION OF PUCCA DRAIN FROM NURSSERY GATE TOWARDS UTTAM LAND AT KRISHNAPUR _CFC |
350000 |
CONSTRUCTION OF PUCCA DRAIN FROM NURSSERY GATE TOWARDS UTTAM LAND AT KRISHNAPUR _CFC1 |
Roof laid |
-
latitude : 24.955155663192272,24.955500536598265
Longitude : 88.15762910060585,88.15765969455242
file name : Image_30052024160425868.png
|
2024-05-30 16:04:25.929291 |
294 |
34494526 |
CONSTRUCTION OF PUCCA DRAIN FROM NURSSERY GATE TOWARDS UTTAM LAND AT KRISHNAPUR _CFC |
350000 |
CONSTRUCTION OF PUCCA DRAIN FROM NURSSERY GATE TOWARDS UTTAM LAND AT KRISHNAPUR _CFC1 |
Plinth level |
-
latitude : 24.95561918243766,24.955489598214626
Longitude : 88.15769615583122,88.15764393657446
file name : Image_30052024155934966.png
|
2024-05-30 15:59:35.033483 |
295 |
34494526 |
CONSTRUCTION OF PUCCA DRAIN FROM NURSSERY GATE TOWARDS UTTAM LAND AT KRISHNAPUR _CFC |
350000 |
CONSTRUCTION OF PUCCA DRAIN FROM NURSSERY GATE TOWARDS UTTAM LAND AT KRISHNAPUR _CFC1 |
Completion of work |
-
latitude : 24.9787279,24.9787093
Longitude : 88.1541446,88.1541479
file name : Image_13092021174713047.png
|
2021-09-13 17:47:13.129118 |
296 |
67588630 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.940794236026704,24.940874450840056
Longitude : 88.13297213986516,88.1329151429236
file name : Image_22032024144739559.png
|
2024-03-22 14:47:39.623399 |
297 |
67588630 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.940850269049406,24.9408920109272
Longitude : 88.13296593725681,88.13291455619037
file name : Image_22032024143702141.png
|
2024-03-22 14:37:02.232417 |
298 |
67588630 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.94082474615425,24.940900267101824
Longitude : 88.13301237300038,88.13291790895164
file name : Image_22032024143206630.png
|
2024-03-22 14:32:06.711585 |
299 |
67403741 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.9763,24.9761582
Longitude : 88.1560067,88.1562722
file name : Image_22032024162038107.png
|
2024-03-22 16:20:38.165698 |
300 |
67403741 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.975918768905103,24.97608988545835
Longitude : 88.1557472795248,88.15590703859925
file name : Image_22032024161125861.png
|
2024-03-22 16:11:25.925036 |
301 |
67403741 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.97593641281128,24.9761617
Longitude : 88.15574191510677,88.1562545
file name : Image_22032024160420916.png
|
2024-03-22 16:04:20.979174 |
302 |
67588847 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.929798813536763,24.929652088321745
Longitude : 88.13145442865789,88.13148343004286
file name : Image_15122023134751322.png
|
2023-12-15 13:47:51.394436 |
303 |
67588847 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.929732722230256,24.929689806886017
Longitude : 88.13137882389128,88.13147211447358
file name : Image_15122023134413523.png
|
2023-12-15 13:44:13.592511 |
304 |
67588847 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.92930168285966,24.929453269578516
Longitude : 88.13143724575639,88.13147932291031
file name : Image_13122023135027441.png
|
2023-12-13 13:50:27.538611 |
305 |
67647953 |
Drainage Construction |
170166 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.961552103050053
Longitude : 88.16190429031849
file name : Image_06022024141058859.png
|
2024-02-06 14:10:57.631771 |
306 |
67647953 |
Drainage Construction |
170166 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.961513923481107
Longitude : 88.16187009215355
file name : Image_06022024135831537.png
|
2024-02-06 13:58:31.618633 |
307 |
67647953 |
Drainage Construction |
170166 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.961474193260074
Longitude : 88.16188274882734
file name : Image_01022024142344615.png
|
2024-02-01 14:23:44.679218 |
308 |
67640195 |
Installation of Tubewell |
500834 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 24.977115327492356
Longitude : 88.15599831752479
file name : Image_28022024143542238.png
|
2024-02-28 14:35:42.329267 |
309 |
67640195 |
Installation of Tubewell |
500834 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 24.973919140174985
Longitude : 88.1571255158633
file name : Image_28022024143152326.png
|
2024-02-28 14:31:52.415229 |
310 |
67640195 |
Installation of Tubewell |
500834 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 24.960666010156274
Longitude : 88.16204451955855
file name : Image_28022024143050616.png
|
2024-02-28 14:30:50.696385 |
311 |
67640195 |
Installation of Tubewell |
500834 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 24.958968297578394
Longitude : 88.16291749477386
file name : Image_28022024141200687.png
|
2024-02-28 14:12:00.768535 |
312 |
67640195 |
Installation of Tubewell |
500834 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 24.97875
Longitude : 88.1541856
file name : Image_12122023151041025.png
|
2023-12-12 15:10:41.111786 |
313 |
67640195 |
Installation of Tubewell |
500834 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 24.9787829
Longitude : 88.15417
file name : Image_12122023150652694.png
|
2023-12-12 15:06:52.799854 |
314 |
68338890 |
Drinking water facility |
104000 |
Drinking water facility1 |
Roof laid |
-
latitude : 24.9294525
Longitude : 88.1289691
file name : Image_11122023150005015.png
|
2023-12-11 15:00:05.093871 |
315 |
68338890 |
Drinking water facility |
104000 |
Drinking water facility1 |
Plinth level |
-
latitude : 24.9294525
Longitude : 88.1289691
file name : Image_11122023145413419.png
|
2023-12-11 14:54:13.503972 |
316 |
68338890 |
Drinking water facility |
104000 |
Drinking water facility1 |
Completion of work |
-
latitude : 24.929602132178843
Longitude : 88.12897263094783
file name : Image_11122023144611754.png
|
2023-12-11 14:46:11.912632 |
317 |
58197779 |
CONSTRUCTION OF CC ROAD FROM SHIBNATH HOUSE AT KANCHANTAR |
200000 |
CONSTRUCTION OF CC ROAD FROM SHIBNATH HOUSE AT KANCHANTAR1 |
Roof laid |
-
latitude : 24.93062623310834,24.930422133766115
Longitude : 88.13074666075408,88.13081203959882
file name : Image_28032024154437243.png
|
2024-03-28 15:44:37.321634 |
318 |
58197779 |
CONSTRUCTION OF CC ROAD FROM SHIBNATH HOUSE AT KANCHANTAR |
200000 |
CONSTRUCTION OF CC ROAD FROM SHIBNATH HOUSE AT KANCHANTAR1 |
Plinth level |
-
latitude : 24.93062329944223,24.930387097410858
Longitude : 88.13074473291636,88.13081874512136
file name : Image_28032024153448673.png
|
2024-03-28 15:34:48.759682 |
319 |
58197779 |
CONSTRUCTION OF CC ROAD FROM SHIBNATH HOUSE AT KANCHANTAR |
200000 |
CONSTRUCTION OF CC ROAD FROM SHIBNATH HOUSE AT KANCHANTAR1 |
Completion of work |
-
latitude : 24.930576737970114,24.930389653891325
Longitude : 88.13073081895709,88.13083198852837
file name : Image_28032024152821671.png
|
2024-03-28 15:28:21.739589 |
320 |
58197779 |
CONSTRUCTION OF CC ROAD FROM SHIBNATH HOUSE AT KANCHANTAR |
200000 |
CONSTRUCTION OF CC ROAD FROM SHIBNATH HOUSE AT KANCHANTAR1 |
Completion of work |
-
latitude : 24.930612025782466,24.93039397057146
Longitude : 88.13073710538447,88.13080399297178
file name : Image_28032024152506026.png
|
2024-03-28 15:25:06.110404 |
321 |
58139947 |
INSTALLATION OF SUB MERSSIBLE PUMP FOR GP OFFICE |
350000 |
INSTALLATION OF SUB MERSSIBLE PUMP FOR GP OFFICE1 |
Roof laid |
-
latitude : 24.9787604
Longitude : 88.1541966
file name : Image_08022024141408761.png
|
2024-02-08 14:14:08.858732 |
322 |
58139947 |
INSTALLATION OF SUB MERSSIBLE PUMP FOR GP OFFICE |
350000 |
INSTALLATION OF SUB MERSSIBLE PUMP FOR GP OFFICE1 |
Plinth level |
-
latitude : 24.9787498
Longitude : 88.1541816
file name : Image_08022024141145877.png
|
2024-02-08 14:11:45.950117 |
323 |
58139947 |
INSTALLATION OF SUB MERSSIBLE PUMP FOR GP OFFICE |
350000 |
INSTALLATION OF SUB MERSSIBLE PUMP FOR GP OFFICE1 |
Completion of work |
-
latitude : 24.9787772
Longitude : 88.1541767
file name : Image_08022024140426465.png
|
2024-02-08 14:04:26.557206 |
324 |
46811468 |
Installation of Sanitary Napkin Vending Machine at Jaharatala High (H.S.) School at Jaharatala. |
60000 |
Installation of Sanitary Napkin Vending Machine at Jaharatala High (H.S.) School at Jaharatala.1 |
Roof laid |
-
latitude : 24.964706380851567
Longitude : 88.1589474901557
file name : Image_13062024144743006.png
|
2024-06-13 14:47:43.092984 |
325 |
46811468 |
Installation of Sanitary Napkin Vending Machine at Jaharatala High (H.S.) School at Jaharatala. |
60000 |
Installation of Sanitary Napkin Vending Machine at Jaharatala High (H.S.) School at Jaharatala.1 |
Plinth level |
-
latitude : 24.9651233
Longitude : 88.1587312
file name : Image_13062024144406425.png
|
2024-06-13 14:44:06.511875 |
326 |
46811468 |
Installation of Sanitary Napkin Vending Machine at Jaharatala High (H.S.) School at Jaharatala. |
60000 |
Installation of Sanitary Napkin Vending Machine at Jaharatala High (H.S.) School at Jaharatala.1 |
Completion of work |
-
latitude : 24.9650743
Longitude : 88.1586781
file name : Image_02092022150917020.png
|
2022-09-02 15:09:17.126742 |
327 |
46811311 |
Installation of Sanitary Napkin Vending Machine at Hazi Mohammad Ali High School at Pukurpara. |
60000 |
Installation of Sanitary Napkin Vending Machine at Hazi Mohammad Ali High School at Pukurpara.1 |
Plinth level |
-
latitude : 24.9593562
Longitude : 88.1572984
file name : Image_13062024145841315.png
|
2024-06-13 14:58:41.40206 |
328 |
46811311 |
Installation of Sanitary Napkin Vending Machine at Hazi Mohammad Ali High School at Pukurpara. |
60000 |
Installation of Sanitary Napkin Vending Machine at Hazi Mohammad Ali High School at Pukurpara.1 |
Completion of work |
-
latitude : 24.9593624
Longitude : 88.1572641
file name : Image_02092022150907971.png
|
2022-09-02 15:09:08.080484 |
329 |
46981178 |
Construction of cement concrete road from Moja Sekh's towards Tri Mohini at Fulbari. |
350000 |
Construction of cement concrete road from Moja Sekh's towards Tri Mohini at Fulbari.1 |
Completion of work |
-
latitude : 24.957872279919684,24.95784176979214,24.957634401507676
Longitude : 88.12832898460329,88.12834926880896,88.128463011235
file name : Image_21102022162703511.png
|
2022-10-21 16:27:03.587331 |
330 |
67587522 |
Construction of roads |
225000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.95935583487153,24.959233584813774
Longitude : 88.1524061691016,88.15242100507021
file name : Image_14062024152321531.png
|
2024-06-14 15:23:21.425345 |
331 |
67587522 |
Construction of roads |
225000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.959374233148992,24.959303196519613
Longitude : 88.15241589210927,88.15239703282714
file name : Image_14062024152040824.png
|
2024-06-14 15:20:40.810479 |
332 |
67587522 |
Construction of roads |
225000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.959398582577705,24.959295107983053
Longitude : 88.15240164287388,88.15238177776337
file name : Image_14062024151329685.png
|
2024-06-14 15:13:29.798733 |
333 |
86817521 |
UPGRADATION OF CC ROAD FROM GUNIRAM MANDAL HOUSE TOWARDS SITALA MANDIR AT RAIPUR UNDER JADUPUR 2 GP |
100000 |
UPGRADATION OF CC ROAD FROM GUNIRAM MANDAL HOUSE TOWARDS SITALA MANDIR AT RAIPUR UNDER JADUPUR 2 GP1 |
Roof laid |
-
latitude : 24.962645396590233,24.962665135972202
Longitude : 88.16936133429408,88.1693756673485
file name : Image_12122023141102712.png
|
2023-12-12 14:11:02.89442 |
334 |
86817521 |
UPGRADATION OF CC ROAD FROM GUNIRAM MANDAL HOUSE TOWARDS SITALA MANDIR AT RAIPUR UNDER JADUPUR 2 GP |
100000 |
UPGRADATION OF CC ROAD FROM GUNIRAM MANDAL HOUSE TOWARDS SITALA MANDIR AT RAIPUR UNDER JADUPUR 2 GP1 |
Plinth level |
-
latitude : 24.962509274482727,24.962498671375215
Longitude : 88.16894358024001,88.16897266544402
file name : Image_11122023141013087.png
|
2023-12-11 14:10:13.152109 |
335 |
86817521 |
UPGRADATION OF CC ROAD FROM GUNIRAM MANDAL HOUSE TOWARDS SITALA MANDIR AT RAIPUR UNDER JADUPUR 2 GP |
100000 |
UPGRADATION OF CC ROAD FROM GUNIRAM MANDAL HOUSE TOWARDS SITALA MANDIR AT RAIPUR UNDER JADUPUR 2 GP1 |
Completion of work |
-
latitude : 24.962488529272377,24.962494312785566
Longitude : 88.16889991052449,88.1689129024744
file name : Image_11122023135942406.png
|
2023-12-11 13:59:42.473855 |
336 |
88934783 |
Maintenance/ Upgradation of Gram Panchayat Bhawan |
75000 |
Maintenance/ Upgradation of Gram Panchayat Bhawan1 |
Roof laid |
-
latitude : 24.9787462
Longitude : 88.1541828
file name : Image_11092024184305672.png
|
2024-09-11 18:43:05.746052 |
337 |
88934783 |
Maintenance/ Upgradation of Gram Panchayat Bhawan |
75000 |
Maintenance/ Upgradation of Gram Panchayat Bhawan1 |
Plinth level |
-
latitude : 24.9787523
Longitude : 88.1541766
file name : Image_11092024184129010.png
|
2024-09-11 18:41:29.078928 |
338 |
88934783 |
Maintenance/ Upgradation of Gram Panchayat Bhawan |
75000 |
Maintenance/ Upgradation of Gram Panchayat Bhawan1 |
Completion of work |
-
latitude : 24.9787388
Longitude : 88.1541892
file name : Image_11092024183942197.png
|
2024-09-11 18:39:42.271581 |
339 |
34465560 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM ENAMUL HOUSE TOWARDS SENTU SK HOUSE AT MOSLEMPUR _CFC |
250000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM ENAMUL HOUSE TOWARDS SENTU SK HOUSE AT MOSLEMPUR _CFC1 |
Roof laid |
-
latitude : 24.940485446713865,24.940433017909527
Longitude : 88.15657775849104,88.15663517452776
file name : Image_19092024130221873.png
|
2024-09-19 13:02:21.94776 |
340 |
34465560 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM ENAMUL HOUSE TOWARDS SENTU SK HOUSE AT MOSLEMPUR _CFC |
250000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM ENAMUL HOUSE TOWARDS SENTU SK HOUSE AT MOSLEMPUR _CFC1 |
Plinth level |
-
latitude : 24.940489302389324,24.94046587496996
Longitude : 88.15657616592944,88.1566178239882
file name : Image_19092024125749767.png
|
2024-09-19 12:57:49.849694 |
341 |
34465560 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM ENAMUL HOUSE TOWARDS SENTU SK HOUSE AT MOSLEMPUR _CFC |
250000 |
CONSTRUCTION OF PUCCA DRAIN WITH COVER FROM ENAMUL HOUSE TOWARDS SENTU SK HOUSE AT MOSLEMPUR _CFC1 |
Completion of work |
-
latitude : 24.93681295774877,24.939413988031447
Longitude : 88.15520698204637,88.1559700705111
file name : Image_28102021134748115.png
|
2021-10-28 13:47:48.197799 |
342 |
34477454 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM IMAM HOUSE TOWARDS ATIKUL HOUSE AT MOSLEMPUR _CFC |
150000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM IMAM HOUSE TOWARDS ATIKUL HOUSE AT MOSLEMPUR _CFC1 |
Roof laid |
-
latitude : 24.943847889080644,24.943576399236917
Longitude : 88.15928041934967,88.15946792252362
file name : Image_19092024120746944.png
|
2024-09-19 12:07:47.013904 |
343 |
34477454 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM IMAM HOUSE TOWARDS ATIKUL HOUSE AT MOSLEMPUR _CFC |
150000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM IMAM HOUSE TOWARDS ATIKUL HOUSE AT MOSLEMPUR _CFC1 |
Plinth level |
-
latitude : 24.943707617931068,24.943816121667624
Longitude : 88.15937605686486,88.15928586758673
file name : Image_19092024120256232.png
|
2024-09-19 12:02:56.313298 |
344 |
34477454 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM IMAM HOUSE TOWARDS ATIKUL HOUSE AT MOSLEMPUR _CFC |
150000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM IMAM HOUSE TOWARDS ATIKUL HOUSE AT MOSLEMPUR _CFC1 |
Completion of work |
-
latitude : 24.94352711364627,24.94380958378315
Longitude : 88.15944906324148,88.15929533913732
file name : Image_27012021131622396.png
|
2021-01-27 13:16:22.459127 |
345 |
67408860 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.961601179093122,24.961808547377586
Longitude : 88.12915510497987,88.12906491570175
file name : Image_06062024132336085.png
|
2024-06-06 13:23:36.162593 |
346 |
67408860 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.961637682281435,24.961789646185935
Longitude : 88.12916038557887,88.12906659208238
file name : Image_06062024132635204.png
|
2024-06-06 13:26:35.297467 |
347 |
67408860 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.96159736532718,24.961761943995953
Longitude : 88.12915460206568,88.12908771447837
file name : Image_06062024132944330.png
|
2024-06-06 13:29:44.414477 |
348 |
67408860 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.96160968672484,24.961804607883096
Longitude : 88.12916298396885,88.12907329760492
file name : Image_06062024132030642.png
|
2024-06-06 13:20:30.720332 |
349 |
67408860 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.961634329520166,24.961634329520166
Longitude : 88.12912995927036,88.12912995927036
file name : Image_06062024131254683.png
|
2024-06-06 13:12:54.773716 |
350 |
34478435 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM RATAN SARKAR HOUSE TOWARDS BSF ROAD AT HKK COLONY _CFC |
200000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM RATAN SARKAR HOUSE TOWARDS BSF ROAD AT HKK COLONY _CFC1 |
Roof laid |
-
latitude : 24.938263949006796,24.938266379758716
Longitude : 88.13656370155513,88.13655448146164
file name : Image_19092024132328180.png
|
2024-09-19 13:23:28.256089 |
351 |
34478435 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM RATAN SARKAR HOUSE TOWARDS BSF ROAD AT HKK COLONY _CFC |
200000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM RATAN SARKAR HOUSE TOWARDS BSF ROAD AT HKK COLONY _CFC1 |
Plinth level |
-
latitude : 24.9376653553918,24.938250370323658
Longitude : 88.1367745064199,88.13656554557383
file name : Image_19092024131747853.png
|
2024-09-19 13:17:47.929214 |
352 |
34478435 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM RATAN SARKAR HOUSE TOWARDS BSF ROAD AT HKK COLONY _CFC |
200000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM RATAN SARKAR HOUSE TOWARDS BSF ROAD AT HKK COLONY _CFC1 |
Completion of work |
-
latitude : 24.937684717588127,24.938017730601132
Longitude : 88.13675723969936,88.13661122694612
file name : Image_04022021164354043.png
|
2021-02-04 16:43:54.126979 |
353 |
34478865 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM BSF ROAD TOWARDS BAPPA POND AT HKK COLONY _CFC |
200000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM BSF ROAD TOWARDS BAPPA POND AT HKK COLONY _CFC1 |
Roof laid |
-
latitude : 24.934567068703473,24.934585676528513
Longitude : 88.13597118481994,88.13593983650208
file name : Image_19092024133707924.png
|
2024-09-19 13:37:07.994272 |
354 |
34478865 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM BSF ROAD TOWARDS BAPPA POND AT HKK COLONY _CFC |
200000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM BSF ROAD TOWARDS BAPPA POND AT HKK COLONY _CFC1 |
Plinth level |
-
latitude : 24.934243778698146,24.93453986942768
Longitude : 88.13598744571209,88.13594955950975
file name : Image_19092024133320124.png
|
2024-09-19 13:33:20.190988 |
355 |
34478865 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM BSF ROAD TOWARDS BAPPA POND AT HKK COLONY _CFC |
200000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM BSF ROAD TOWARDS BAPPA POND AT HKK COLONY _CFC1 |
Completion of work |
-
latitude : 24.93405677843839,24.934262889437377
Longitude : 88.13599431887269,88.13597026281059
file name : Image_16112021140212431.png
|
2021-11-16 14:02:12.501251 |
356 |
34479681 |
CONSTRUCTION OF CC ROAD FROM GOBINDA MANDIR BABULAL HALDAR _CFC |
200000 |
CONSTRUCTION OF CC ROAD FROM GOBINDA MANDIR BABULAL HALDAR _CFC1 |
Roof laid |
-
latitude : 24.9304767,24.930668561719358
Longitude : 88.1327757,88.13252387568355
file name : Image_19092024134733850.png
|
2024-09-19 13:47:33.920294 |
357 |
34479681 |
CONSTRUCTION OF CC ROAD FROM GOBINDA MANDIR BABULAL HALDAR _CFC |
200000 |
CONSTRUCTION OF CC ROAD FROM GOBINDA MANDIR BABULAL HALDAR _CFC1 |
Plinth level |
-
latitude : 24.9304499,24.93085501715541
Longitude : 88.1328052,88.13259470276535
file name : Image_19092024134258598.png
|
2024-09-19 13:42:58.65992 |
358 |
34479681 |
CONSTRUCTION OF CC ROAD FROM GOBINDA MANDIR BABULAL HALDAR _CFC |
200000 |
CONSTRUCTION OF CC ROAD FROM GOBINDA MANDIR BABULAL HALDAR _CFC1 |
Completion of work |
-
latitude : 24.93070598691702,24.93121367879212
Longitude : 88.13258179463446,88.1327457446605
file name : Image_30092022125438934.png
|
2022-09-30 12:54:39.03081 |
359 |
34487454 |
CONSTRUCTION OF CC ROAD FROM SATTYA SAHA HOUSE TOWARDS ASHOK DAS HOUSE _CFC. |
250000 |
CONSTRUCTION OF CC ROAD FROM SATTYA SAHA HOUSE TOWARDS ASHOK DAS HOUSE _CFC.1 |
Roof laid |
-
latitude : 24.9307176,24.9306689
Longitude : 88.1319248,88.1319273
file name : Image_19092024140117476.png
|
2024-09-19 14:01:17.544133 |
360 |
34487454 |
CONSTRUCTION OF CC ROAD FROM SATTYA SAHA HOUSE TOWARDS ASHOK DAS HOUSE _CFC. |
250000 |
CONSTRUCTION OF CC ROAD FROM SATTYA SAHA HOUSE TOWARDS ASHOK DAS HOUSE _CFC.1 |
Plinth level |
-
latitude : 24.9307156,24.9307185
Longitude : 88.1319247,88.1319234
file name : Image_19092024135414578.png
|
2024-09-19 13:54:13.914415 |
361 |
34487454 |
CONSTRUCTION OF CC ROAD FROM SATTYA SAHA HOUSE TOWARDS ASHOK DAS HOUSE _CFC. |
250000 |
CONSTRUCTION OF CC ROAD FROM SATTYA SAHA HOUSE TOWARDS ASHOK DAS HOUSE _CFC.1 |
Completion of work |
-
latitude : 24.9305145,24.9305192
Longitude : 88.1317125,88.1317088
file name : Image_02022021141251216.png
|
2021-02-02 14:12:51.296417 |
362 |
68659759 |
Water Supply to villages |
185000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 24.9776049
Longitude : 88.1553093
file name : Image_03072024141649734.png
|
2024-07-03 14:16:49.796483 |
363 |
68659759 |
Water Supply to villages |
185000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.9776048
Longitude : 88.1553037
file name : Image_03072024141326163.png
|
2024-07-03 14:13:26.228201 |
364 |
68659759 |
Water Supply to villages |
185000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.942826931364834
Longitude : 88.13419422134757
file name : Image_06122023140119279.png
|
2023-12-06 14:01:19.364592 |
365 |
68659759 |
Water Supply to villages |
185000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.97756
Longitude : 88.155237
file name : Image_19042023161002507.png
|
2023-04-19 16:10:02.568311 |
366 |
68616253 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS NIKHIL DAS HOUSE AT GOPALPUR |
50000 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS NIKHIL DAS HOUSE AT GOPALPUR1 |
Roof laid |
-
latitude : 24.972264552488923,24.972257637418807
Longitude : 88.15692384727299,88.15698151476681
file name : Image_03072024144609559.png
|
2024-07-03 14:46:09.630707 |
367 |
68616253 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS NIKHIL DAS HOUSE AT GOPALPUR |
50000 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS NIKHIL DAS HOUSE AT GOPALPUR1 |
Plinth level |
-
latitude : 24.972244100645185,24.972269623540342
Longitude : 88.15694195218384,88.15700800158083
file name : Image_03072024144235010.png
|
2024-07-03 14:42:35.076622 |
368 |
68616253 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS NIKHIL DAS HOUSE AT GOPALPUR |
50000 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS NIKHIL DAS HOUSE AT GOPALPUR1 |
Plinth level |
-
latitude : 24.972244100645185,24.972269623540342
Longitude : 88.15694195218384,88.15700800158083
file name : Image_03072024143819260.png
|
2024-07-03 14:38:19.36497 |
369 |
68616253 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS NIKHIL DAS HOUSE AT GOPALPUR |
50000 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS NIKHIL DAS HOUSE AT GOPALPUR1 |
Plinth level |
-
latitude : 24.972258266061544,24.97225457802415
Longitude : 88.15689191222191,88.15702962689102
file name : Image_27042023161808277.png
|
2023-04-27 16:18:08.377525 |
370 |
68659849 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 24.9714658
Longitude : 88.1555414
file name : Image_03072024150342495.png
|
2024-07-03 15:03:42.565763 |
371 |
68659849 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.9714725
Longitude : 88.1555417
file name : Image_03072024145822759.png
|
2024-07-03 14:58:22.842713 |
372 |
68659849 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.9714928
Longitude : 88.1555387
file name : Image_25042023175751721.png
|
2023-04-25 17:57:51.799206 |
373 |
58184879 |
CONSTRUCTION OF CC ROAD FROM BALAI MANDAL HOUSE AT GOPALPUR |
200000 |
CONSTRUCTION OF CC ROAD FROM BALAI MANDAL HOUSE AT GOPALPUR1 |
Roof laid |
-
latitude : 24.972619442269206,24.972522212192416
Longitude : 88.16089401952922,88.16093064844608
file name : Image_03072024151613433.png
|
2024-07-03 15:16:13.5073 |
374 |
58184879 |
CONSTRUCTION OF CC ROAD FROM BALAI MANDAL HOUSE AT GOPALPUR |
200000 |
CONSTRUCTION OF CC ROAD FROM BALAI MANDAL HOUSE AT GOPALPUR1 |
Plinth level |
-
latitude : 24.97259756550193,24.97253139037639
Longitude : 88.16096526570618,88.16092419438064
file name : Image_03072024151213789.png
|
2024-07-03 15:12:13.859535 |
375 |
58184879 |
CONSTRUCTION OF CC ROAD FROM BALAI MANDAL HOUSE AT GOPALPUR |
200000 |
CONSTRUCTION OF CC ROAD FROM BALAI MANDAL HOUSE AT GOPALPUR1 |
Completion of work |
-
latitude : 24.972621370106936,24.972529378719628
Longitude : 88.16089645028114,88.16091178916395
file name : Image_03072024150816441.png
|
2024-07-03 15:08:16.51765 |
376 |
58184879 |
CONSTRUCTION OF CC ROAD FROM BALAI MANDAL HOUSE AT GOPALPUR |
200000 |
CONSTRUCTION OF CC ROAD FROM BALAI MANDAL HOUSE AT GOPALPUR1 |
Completion of work |
-
latitude : 24.97265389189124,24.97258306480944
Longitude : 88.16085093654692,88.16086459904909
file name : Image_19042023164115996.png
|
2023-04-19 16:41:16.071175 |
377 |
68620606 |
CONSTRUCTION OF CC ROAD FROM RAMEN RABIDAS HOUSE TOWARDS BIMAL DAS HOUSE AT AMJAMTOLA |
100000 |
CONSTRUCTION OF CC ROAD FROM RAMEN RABIDAS HOUSE TOWARDS BIMAL DAS HOUSE AT AMJAMTOLA1 |
Roof laid |
-
latitude : 24.974381108768284,24.9743742775172
Longitude : 88.14820373430848,88.14822955057025
file name : Image_10052023141423562.png
|
2023-05-10 14:14:23.632661 |
378 |
68620606 |
CONSTRUCTION OF CC ROAD FROM RAMEN RABIDAS HOUSE TOWARDS BIMAL DAS HOUSE AT AMJAMTOLA |
100000 |
CONSTRUCTION OF CC ROAD FROM RAMEN RABIDAS HOUSE TOWARDS BIMAL DAS HOUSE AT AMJAMTOLA1 |
Roof laid |
-
latitude : 24.97453583870083,24.974397998303175
Longitude : 88.14820968545973,88.14820859581232
file name : Image_10052023141444071.png
|
2023-05-10 14:14:44.147105 |
379 |
88977018 |
Water Supply to villages |
160000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 24.94206706993282
Longitude : 88.13221550546587
file name : Image_24092024141648991.png
|
2024-09-24 14:16:48.975898 |
380 |
88977018 |
Water Supply to villages |
160000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.94203467387706
Longitude : 88.13213596120477
file name : Image_24092024141401312.png
|
2024-09-24 14:14:01.408242 |
381 |
88977018 |
Water Supply to villages |
160000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.94207373354584
Longitude : 88.13219144940376
file name : Image_24092024140850580.png
|
2024-09-24 14:08:50.650729 |
382 |
88977018 |
Water Supply to villages |
160000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.94212310295552
Longitude : 88.1321891862899
file name : Image_24092024140843958.png
|
2024-09-24 14:08:44.023414 |
383 |
88977018 |
Water Supply to villages |
160000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.94207373354584
Longitude : 88.13219144940376
file name : Image_24092024140837673.png
|
2024-09-24 14:08:37.744249 |
384 |
88977018 |
Water Supply to villages |
160000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.94212310295552
Longitude : 88.1321891862899
file name : Image_24092024140832155.png
|
2024-09-24 14:08:32.229997 |
385 |
88977018 |
Water Supply to villages |
160000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.942080229520798
Longitude : 88.13218952156603
file name : Image_24092024140825007.png
|
2024-09-24 14:08:25.095355 |
386 |
68352065 |
Drinking water facility |
200000 |
Drinking water facility1 |
Roof laid |
-
latitude : 24.939743229188025
Longitude : 88.13603069633245
file name : Image_26092024124831896.png
|
2024-09-26 12:48:32.028824 |
387 |
68352065 |
Drinking water facility |
200000 |
Drinking water facility1 |
Plinth level |
-
latitude : 24.93966850452125
Longitude : 88.13600303605199
file name : Image_24092024143215841.png
|
2024-09-24 14:32:15.939486 |
388 |
68352065 |
Drinking water facility |
200000 |
Drinking water facility1 |
Completion of work |
-
latitude : 24.939720178954303
Longitude : 88.13601854257286
file name : Image_24092024142826048.png
|
2024-09-24 14:28:26.131384 |
389 |
86837675 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 24.9656577
Longitude : 88.1664946
file name : Image_09072024141557068.png
|
2024-07-09 14:15:57.142442 |
390 |
86837675 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.9656524
Longitude : 88.166504
file name : Image_09072024141202719.png
|
2024-07-09 14:12:02.791766 |
391 |
86837675 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.9656617
Longitude : 88.1663736
file name : Image_08082023145021499.png
|
2023-08-08 14:50:21.569576 |
392 |
86837675 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.9656554
Longitude : 88.1664327
file name : Image_08082023144639950.png
|
2023-08-08 14:46:40.030066 |
393 |
86837675 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.9656536
Longitude : 88.1664481
file name : Image_08082023144029742.png
|
2023-08-08 14:40:29.822368 |
394 |
34464539 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM DWIJEN SAHA HOUSE TOWARDS PHULTALA MORE AT RAIPUR CFC |
276384 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM DWIJEN SAHA HOUSE TOWARDS PHULTALA MORE AT RAIPUR CFC1 |
Roof laid |
-
latitude : 24.96473609469831,24.96473609469831
Longitude : 88.16709470003843,88.16709470003843
file name : Image_09072024142729185.png
|
2024-07-09 14:27:29.254329 |
395 |
34464539 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM DWIJEN SAHA HOUSE TOWARDS PHULTALA MORE AT RAIPUR CFC |
276384 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM DWIJEN SAHA HOUSE TOWARDS PHULTALA MORE AT RAIPUR CFC1 |
Plinth level |
-
latitude : 24.964724695309997,24.96474946383387
Longitude : 88.16713551990688,88.16722830757499
file name : Image_09072024142144296.png
|
2024-07-09 14:21:44.368084 |
396 |
34464539 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM DWIJEN SAHA HOUSE TOWARDS PHULTALA MORE AT RAIPUR CFC |
276384 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM DWIJEN SAHA HOUSE TOWARDS PHULTALA MORE AT RAIPUR CFC1 |
Completion of work |
-
latitude : 24.964723479934037,24.96471120044589
Longitude : 88.16741983406246,88.16717843525112
file name : Image_02052022123549615.png
|
2022-05-02 12:35:49.714315 |
397 |
58149582 |
CONSTRUCTION OF CC DRAIN FROM YUBA SUPER CLUB AT KUMARPUR |
300000 |
CONSTRUCTION OF CC DRAIN FROM YUBA SUPER CLUB AT KUMARPUR1 |
Roof laid |
-
latitude : 24.955612812191248,24.955810247920454
Longitude : 88.17464855499566,88.17470488138497
file name : Image_09072024144831112.png
|
2024-07-09 14:48:31.193757 |
398 |
58149582 |
CONSTRUCTION OF CC DRAIN FROM YUBA SUPER CLUB AT KUMARPUR |
300000 |
CONSTRUCTION OF CC DRAIN FROM YUBA SUPER CLUB AT KUMARPUR1 |
Plinth level |
-
latitude : 24.955830196850002,24.955691769719124
Longitude : 88.17470605485141,88.17468526773155
file name : Image_09072024144312667.png
|
2024-07-09 14:43:12.738846 |
399 |
58149582 |
CONSTRUCTION OF CC DRAIN FROM YUBA SUPER CLUB AT KUMARPUR |
300000 |
CONSTRUCTION OF CC DRAIN FROM YUBA SUPER CLUB AT KUMARPUR1 |
Completion of work |
-
latitude : 24.95573602616787,24.95571792125702
Longitude : 88.17475341260433,88.17468015477061
file name : Image_09072024143415542.png
|
2024-07-09 14:34:15.619899 |
400 |
58149582 |
CONSTRUCTION OF CC DRAIN FROM YUBA SUPER CLUB AT KUMARPUR |
300000 |
CONSTRUCTION OF CC DRAIN FROM YUBA SUPER CLUB AT KUMARPUR1 |
Completion of work |
-
latitude : 24.9555936595425,24.955802620388567
Longitude : 88.17465056665242,88.1747115869075
file name : Image_20042023103838429.png
|
2023-04-20 10:38:38.520566 |
401 |
58188267 |
CONSTRUCTION OF CC ROAD FROM KARTIK SOREN HOUSE AT GOBINDAPUR |
300000 |
CONSTRUCTION OF CC ROAD FROM KARTIK SOREN HOUSE AT GOBINDAPUR1 |
Roof laid |
-
latitude : 24.959467188455164,24.959444515407085
Longitude : 88.16239052452147,88.16242405213416
file name : Image_09072024150337044.png
|
2024-07-09 15:03:37.110748 |
402 |
58188267 |
CONSTRUCTION OF CC ROAD FROM KARTIK SOREN HOUSE AT GOBINDAPUR |
300000 |
CONSTRUCTION OF CC ROAD FROM KARTIK SOREN HOUSE AT GOBINDAPUR1 |
Plinth level |
-
latitude : 24.960222,24.960222
Longitude : 88.1621926,88.1621926
file name : Image_09072024150108225.png
|
2024-07-09 15:01:08.299237 |
403 |
58188267 |
CONSTRUCTION OF CC ROAD FROM KARTIK SOREN HOUSE AT GOBINDAPUR |
300000 |
CONSTRUCTION OF CC ROAD FROM KARTIK SOREN HOUSE AT GOBINDAPUR1 |
Completion of work |
-
latitude : 24.959457674995065,24.959457674995065
Longitude : 88.16239890642464,88.16239890642464
file name : Image_09072024145719195.png
|
2024-07-09 14:57:19.267107 |
404 |
58188267 |
CONSTRUCTION OF CC ROAD FROM KARTIK SOREN HOUSE AT GOBINDAPUR |
300000 |
CONSTRUCTION OF CC ROAD FROM KARTIK SOREN HOUSE AT GOBINDAPUR1 |
Completion of work |
-
latitude : 24.959198506549,24.959668102674186
Longitude : 88.16255246289074,88.16234174184501
file name : Image_20042023115055648.png
|
2023-04-20 11:50:55.727827 |
405 |
68620168 |
CONSTRUCTION OF CC ROAD FROM SERAJUL HOUSE TOWARDS SARIYATS HOUSE AT GOBINDAPUR |
50000 |
CONSTRUCTION OF CC ROAD FROM SERAJUL HOUSE TOWARDS SARIYATS HOUSE AT GOBINDAPUR1 |
Roof laid |
-
latitude : 24.955166433937848,24.955268944613636
Longitude : 88.16387135535479,88.16395718604326
file name : Image_09072024151622513.png
|
2024-07-09 15:16:22.589267 |
406 |
68620168 |
CONSTRUCTION OF CC ROAD FROM SERAJUL HOUSE TOWARDS SARIYATS HOUSE AT GOBINDAPUR |
50000 |
CONSTRUCTION OF CC ROAD FROM SERAJUL HOUSE TOWARDS SARIYATS HOUSE AT GOBINDAPUR1 |
Plinth level |
-
latitude : 24.955225526355207,24.95527233928442
Longitude : 88.16387143917382,88.16392600536346
file name : Image_09072024151002746.png
|
2024-07-09 15:10:02.833452 |
407 |
68620168 |
CONSTRUCTION OF CC ROAD FROM SERAJUL HOUSE TOWARDS SARIYATS HOUSE AT GOBINDAPUR |
50000 |
CONSTRUCTION OF CC ROAD FROM SERAJUL HOUSE TOWARDS SARIYATS HOUSE AT GOBINDAPUR1 |
Completion of work |
-
latitude : 24.955194178037345,24.955495004542172
Longitude : 88.16385098733008,88.16423253156245
file name : Image_26042023111237900.png
|
2023-04-26 11:12:37.975004 |
408 |
58198540 |
CONSTRUCTION OF CC ROAD FROM PHE TANK AT HKK COLONY |
300000 |
CONSTRUCTION OF CC ROAD FROM PHE TANK AT HKK COLONY1 |
Roof laid |
-
latitude : 24.94595224969089,24.946093526668847
Longitude : 88.12979749403894,88.12971509993076
file name : Image_01102024142142858.png
|
2024-10-01 14:21:42.930807 |
409 |
58198540 |
CONSTRUCTION OF CC ROAD FROM PHE TANK AT HKK COLONY |
300000 |
CONSTRUCTION OF CC ROAD FROM PHE TANK AT HKK COLONY1 |
Plinth level |
-
latitude : 24.94580858387053,24.94594558607787
Longitude : 88.12985264696181,88.12980780377984
file name : Image_01102024141841026.png
|
2024-10-01 14:18:41.101845 |
410 |
58198540 |
CONSTRUCTION OF CC ROAD FROM PHE TANK AT HKK COLONY |
300000 |
CONSTRUCTION OF CC ROAD FROM PHE TANK AT HKK COLONY1 |
Plinth level |
-
latitude : 24.945704606361687,24.94581365492195
Longitude : 88.12992037273943,88.1298254057765
file name : Image_27042023161259661.png
|
2023-04-27 16:12:59.895125 |
411 |
88992180 |
Water Supply to villages |
185000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 24.967558574862778
Longitude : 88.16512495279312
file name : Image_01102024165848290.png
|
2024-10-01 16:58:48.365406 |
412 |
88992180 |
Water Supply to villages |
185000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.96761318296194
Longitude : 88.16514607518911
file name : Image_01102024165412111.png
|
2024-10-01 16:54:12.20023 |
413 |
88992180 |
Water Supply to villages |
185000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.967662845738232
Longitude : 88.16512998193502
file name : Image_01102024164932898.png
|
2024-10-01 16:49:32.983824 |
414 |
46951701 |
Construction of cement concrete road from Hari Mandir towards Babulal Haldar's House at Hare Krishna |
350000 |
Construction of cement concrete road from Hari Mandir towards Babulal Haldar's House at Hare Krishna1 |
Roof laid |
-
latitude : 24.94322125799954,24.94295295327902
Longitude : 88.13387755304575,88.13399045728147
file name : Image_01102024143131040.png
|
2024-10-01 14:31:31.131754 |
415 |
46951701 |
Construction of cement concrete road from Hari Mandir towards Babulal Haldar's House at Hare Krishna |
350000 |
Construction of cement concrete road from Hari Mandir towards Babulal Haldar's House at Hare Krishna1 |
Plinth level |
-
latitude : 24.942868882790208,24.9431447731331
Longitude : 88.1340182852,88.13390060327947
file name : Image_01102024142809850.png
|
2024-10-01 14:28:10.038241 |
416 |
46951701 |
Construction of cement concrete road from Hari Mandir towards Babulal Haldar's House at Hare Krishna |
350000 |
Construction of cement concrete road from Hari Mandir towards Babulal Haldar's House at Hare Krishna1 |
Completion of work |
-
latitude : 24.930745088495314,24.930674387142062
Longitude : 88.13261448405683,88.13259344547987
file name : Image_27092022162231478.png
|
2022-09-27 16:22:31.549084 |
417 |
46951701 |
Construction of cement concrete road from Hari Mandir towards Babulal Haldar's House at Hare Krishna |
350000 |
Construction of cement concrete road from Hari Mandir towards Babulal Haldar's House at Hare Krishna1 |
Completion of work |
-
latitude : 24.943295,24.943005507811904
Longitude : 88.1343432,88.13395315781236
file name : Image_02052022164344380.png
|
2022-05-02 16:43:44.470278 |
418 |
86840920 |
Water Supply to villages |
350000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 24.95884206611663
Longitude : 88.15319540910423
file name : Image_10072024124113386.png
|
2024-07-10 12:41:13.505603 |
419 |
86840920 |
Water Supply to villages |
350000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.9578374
Longitude : 88.1536526
file name : Image_10072024123615265.png
|
2024-07-10 12:36:15.338842 |
420 |
86840920 |
Water Supply to villages |
350000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.9582778
Longitude : 88.1533004
file name : Image_04082023155337642.png
|
2023-08-04 15:53:37.734705 |
421 |
86840920 |
Water Supply to villages |
350000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.9582778
Longitude : 88.1533007
file name : Image_04082023155059208.png
|
2023-08-04 15:50:59.283375 |
422 |
86840920 |
Water Supply to villages |
350000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.95882165618241
Longitude : 88.15322290174663
file name : Image_04082023154842722.png
|
2023-08-04 15:48:42.797721 |
423 |
86837704 |
Water Supply to villages |
350000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 24.9579973
Longitude : 88.1535016
file name : Image_10072024125430664.png
|
2024-07-10 12:54:30.763702 |
424 |
86837704 |
Water Supply to villages |
350000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.9578841
Longitude : 88.1536213
file name : Image_10072024125045747.png
|
2024-07-10 12:50:45.822402 |
425 |
86837704 |
Water Supply to villages |
350000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.9582784
Longitude : 88.1533048
file name : Image_04082023154641814.png
|
2023-08-04 15:46:41.891088 |
426 |
86837704 |
Water Supply to villages |
350000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.9582787
Longitude : 88.1533044
file name : Image_04082023154409882.png
|
2023-08-04 15:44:09.953583 |
427 |
86837704 |
Water Supply to villages |
350000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.95885342359543
Longitude : 88.15320597030222
file name : Image_04082023154029539.png
|
2023-08-04 15:40:29.613535 |
428 |
68307608 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.9578372
Longitude : 88.1536483
file name : Image_10072024130254724.png
|
2024-07-10 13:02:54.804165 |
429 |
68307608 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.9578372
Longitude : 88.1536571
file name : Image_10072024125759928.png
|
2024-07-10 12:58:00.006795 |
430 |
68307608 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.9581954
Longitude : 88.1534091
file name : Image_18042023180129741.png
|
2023-04-18 18:01:29.814145 |
431 |
58149767 |
CONSTRUCTION OF CC DRAIN FROM HABU SEKH HOUSE AT KRISHNAPUR |
350000 |
CONSTRUCTION OF CC DRAIN FROM HABU SEKH HOUSE AT KRISHNAPUR1 |
Roof laid |
-
latitude : 24.9578372,24.9578365
Longitude : 88.1536483,88.1536544
file name : Image_10072024132438429.png
|
2024-07-10 13:24:38.512541 |
432 |
58149767 |
CONSTRUCTION OF CC DRAIN FROM HABU SEKH HOUSE AT KRISHNAPUR |
350000 |
CONSTRUCTION OF CC DRAIN FROM HABU SEKH HOUSE AT KRISHNAPUR1 |
Plinth level |
-
latitude : 24.9578365,24.9578374
Longitude : 88.1536544,88.1536526
file name : Image_10072024131104116.png
|
2024-07-10 13:11:04.18565 |
433 |
58149767 |
CONSTRUCTION OF CC DRAIN FROM HABU SEKH HOUSE AT KRISHNAPUR |
350000 |
CONSTRUCTION OF CC DRAIN FROM HABU SEKH HOUSE AT KRISHNAPUR1 |
Completion of work |
-
latitude : 24.957705438137054,24.9578374
Longitude : 88.15406151115894,88.1536542
file name : Image_10072024130522324.png
|
2024-07-10 13:05:22.404063 |
434 |
58149767 |
CONSTRUCTION OF CC DRAIN FROM HABU SEKH HOUSE AT KRISHNAPUR |
350000 |
CONSTRUCTION OF CC DRAIN FROM HABU SEKH HOUSE AT KRISHNAPUR1 |
Completion of work |
-
latitude : 24.9578241,24.957346776500344
Longitude : 88.1536611,88.15429821610451
file name : Image_20042023110015193.png
|
2023-04-20 11:00:15.280206 |
435 |
68617022 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS MANSUR SK HOUSE AT NISCHINTAPUR |
50000 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS MANSUR SK HOUSE AT NISCHINTAPUR1 |
Roof laid |
-
latitude : 24.95508768595755,24.955113460309803
Longitude : 88.15556614659727,88.15575540997088
file name : Image_10072024133818115.png
|
2024-07-10 13:38:18.184632 |
436 |
68617022 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS MANSUR SK HOUSE AT NISCHINTAPUR |
50000 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS MANSUR SK HOUSE AT NISCHINTAPUR1 |
Plinth level |
-
latitude : 24.955115388147533,24.95508303400129
Longitude : 88.15577921457589,88.15560554154217
file name : Image_10072024133404192.png
|
2024-07-10 13:34:04.27087 |
437 |
68617022 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS MANSUR SK HOUSE AT NISCHINTAPUR |
50000 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS MANSUR SK HOUSE AT NISCHINTAPUR1 |
Completion of work |
-
latitude : 24.955081692896783,24.95507938787341
Longitude : 88.1557367183268,88.15561149269342
file name : Image_10072024132609858.png
|
2024-07-10 13:26:09.937426 |
438 |
68617022 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS MANSUR SK HOUSE AT NISCHINTAPUR |
50000 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS MANSUR SK HOUSE AT NISCHINTAPUR1 |
Completion of work |
-
latitude : 24.95506735984236,24.955026120878756
Longitude : 88.1557631213218,88.15539272502065
file name : Image_20042023111127476.png
|
2023-04-20 11:11:27.54615 |
439 |
68617480 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS SOMAI MURMU HOUSE AT KRISHNAPUR |
50000 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS SOMAI MURMU HOUSE AT KRISHNAPUR1 |
Roof laid |
-
latitude : 24.9529895,24.95275877416134
Longitude : 88.1570235,88.15715543925762
file name : Image_10072024134943480.png
|
2024-07-10 13:49:43.557884 |
440 |
68617480 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS SOMAI MURMU HOUSE AT KRISHNAPUR |
50000 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS SOMAI MURMU HOUSE AT KRISHNAPUR1 |
Plinth level |
-
latitude : 24.9529898,24.9529912
Longitude : 88.157024,88.1570248
file name : Image_10072024134610506.png
|
2024-07-10 13:46:10.581395 |
441 |
68617480 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS SOMAI MURMU HOUSE AT KRISHNAPUR |
50000 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS SOMAI MURMU HOUSE AT KRISHNAPUR1 |
Completion of work |
-
latitude : 24.9529901,24.9529901
Longitude : 88.1570247,88.1570247
file name : Image_10072024134139123.png
|
2024-07-10 13:41:39.197236 |
442 |
68617480 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS SOMAI MURMU HOUSE AT KRISHNAPUR |
50000 |
CONSTRUCTION OF CC ROAD FROM MAIN ROAD TOWARDS SOMAI MURMU HOUSE AT KRISHNAPUR1 |
Completion of work |
-
latitude : 24.9530231,24.9530229
Longitude : 88.1569464,88.1569454
file name : Image_20042023163928864.png
|
2023-04-20 16:39:28.942603 |
443 |
69943319 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM YEASIN SEKH HOUSE TOWARDS MUNJUR SEKH HOUSE AT KRISHNAPUR |
300000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM YEASIN SEKH HOUSE TOWARDS MUNJUR SEKH HOUSE AT KRISHNAPUR1 |
Roof laid |
-
latitude : 24.9524682,24.9524685
Longitude : 88.1533281,88.1533244
file name : Image_10072024144653793.png
|
2024-07-10 14:46:53.879364 |
444 |
69943319 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM YEASIN SEKH HOUSE TOWARDS MUNJUR SEKH HOUSE AT KRISHNAPUR |
300000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM YEASIN SEKH HOUSE TOWARDS MUNJUR SEKH HOUSE AT KRISHNAPUR1 |
Plinth level |
-
latitude : 24.954142584465444,24.954138812609017
Longitude : 88.15446116030216,88.154392009601
file name : Image_10072024142248573.png
|
2024-07-10 14:22:48.650157 |
445 |
69943319 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM YEASIN SEKH HOUSE TOWARDS MUNJUR SEKH HOUSE AT KRISHNAPUR |
300000 |
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM YEASIN SEKH HOUSE TOWARDS MUNJUR SEKH HOUSE AT KRISHNAPUR1 |
Plinth level |
-
latitude : 24.95415063109249,24.954058681614697
Longitude : 88.15441137179732,88.15399562940001
file name : Image_27042023143747825.png
|
2023-04-27 14:37:47.907739 |
446 |
89719386 |
Creation of a new source of drinking water |
260000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.929919010028243
Longitude : 88.13061196357012
file name : Image_03102024173005309.png
|
2024-10-03 17:30:05.399909 |
447 |
89719386 |
Creation of a new source of drinking water |
260000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.929969552904367
Longitude : 88.13059033825994
file name : Image_01102024135945653.png
|
2024-10-01 13:59:45.740813 |
448 |
89719386 |
Creation of a new source of drinking water |
260000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.929908071644604
Longitude : 88.13063576817513
file name : Image_30092024181127325.png
|
2024-09-30 18:11:26.886842 |
449 |
67652250 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.948351527564228
Longitude : 88.15990361385047
file name : Image_12072024155849687.png
|
2024-07-12 15:58:49.764782 |
450 |
67652250 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.948438573628664
Longitude : 88.15984225831926
file name : Image_12072024154759500.png
|
2024-07-12 15:47:59.578484 |
451 |
67587315 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.96269166469574,24.962769825942814
Longitude : 88.16843094304204,88.16873931325972
file name : Image_19072024142646978.png
|
2024-07-19 14:26:47.056519 |
452 |
67587315 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.962736633606255,24.962737346068025
Longitude : 88.1687181070447,88.16868038848042
file name : Image_12072024153240452.png
|
2024-07-12 15:32:40.525232 |
453 |
67587315 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.962749709375203,24.962654155679047
Longitude : 88.16874811425805,88.1682949885726
file name : Image_12072024152751353.png
|
2024-07-12 15:27:51.451562 |
454 |
67587315 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.962736256420612,24.96271312236786
Longitude : 88.16873763687909,88.16863504238427
file name : Image_12072024152144759.png
|
2024-07-12 15:21:44.833854 |
455 |
67898452 |
Drinking water facility |
300000 |
Drinking water facility1 |
Roof laid |
-
latitude : 24.959132373332977
Longitude : 88.1306801084429
file name : Image_19072024135011457.png
|
2024-07-19 13:50:11.538049 |
456 |
67898452 |
Drinking water facility |
300000 |
Drinking water facility1 |
Plinth level |
-
latitude : 24.959140797145665
Longitude : 88.13069703988731
file name : Image_19072024134505977.png
|
2024-07-19 13:45:06.051775 |
457 |
67898452 |
Drinking water facility |
300000 |
Drinking water facility1 |
Completion of work |
-
latitude : 24.95913610327989
Longitude : 88.13064037822187
file name : Image_19072024133721776.png
|
2024-07-19 13:37:21.847076 |
458 |
67898452 |
Drinking water facility |
300000 |
Drinking water facility1 |
Completion of work |
-
latitude : 24.959133085794747
Longitude : 88.13064725138247
file name : Image_19072024133010300.png
|
2024-07-19 13:30:10.370873 |
459 |
67587729 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.959347159601748,24.9593573
Longitude : 88.16315260715783,88.1638363
file name : Image_05022024170925656.png
|
2024-02-05 17:09:25.7186 |
460 |
67587729 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.959345944225788,24.959335844032466
Longitude : 88.16315738484263,88.16299511119723
file name : Image_05022024170740265.png
|
2024-02-05 17:07:40.546667 |
461 |
67587729 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.9593515,24.95932205580175
Longitude : 88.1638399,88.16303936764598
file name : Image_05022024163213660.png
|
2024-02-05 16:32:13.735986 |
462 |
67587729 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.959273231215775,24.9593515
Longitude : 88.16270677372813,88.1638399
file name : Image_01022024141701321.png
|
2024-02-01 14:17:01.380327 |
463 |
34486676 |
CONSTRUCTION OF CC ROAD FROM GOUR MANDAL HOUSE TOWARDS GOPALPUR CREMATORIUM_CFC. |
300000 |
CONSTRUCTION OF CC ROAD FROM GOUR MANDAL HOUSE TOWARDS GOPALPUR CREMATORIUM_CFC.1 |
Completion of work |
-
latitude : 24.972586291842163,24.972601672634482
Longitude : 88.16046444699168,88.16064273007214
file name : Image_28052024140447886.png
|
2024-05-28 14:04:47.967211 |
464 |
34486676 |
CONSTRUCTION OF CC ROAD FROM GOUR MANDAL HOUSE TOWARDS GOPALPUR CREMATORIUM_CFC. |
300000 |
CONSTRUCTION OF CC ROAD FROM GOUR MANDAL HOUSE TOWARDS GOPALPUR CREMATORIUM_CFC.1 |
Completion of work |
-
latitude : 24.972535958513618,24.97256265487522
Longitude : 88.16052915528417,88.1606825441122
file name : Image_31032021144237444.png
|
2021-03-31 14:42:37.538794 |
465 |
34488927 |
CONSTRUCTION OF CC ROAD FROM MARJINA BEWA HOUSE TOWARDS SAKIRUL SK HOUSE AT GOBINDAPUR _CFC |
150000 |
CONSTRUCTION OF CC ROAD FROM MARJINA BEWA HOUSE TOWARDS SAKIRUL SK HOUSE AT GOBINDAPUR _CFC1 |
Completion of work |
-
latitude : 24.9530018,24.9530023
Longitude : 88.1650981,88.165098
file name : Image_28052024162823653.png
|
2024-05-28 16:28:23.743517 |
466 |
34488927 |
CONSTRUCTION OF CC ROAD FROM MARJINA BEWA HOUSE TOWARDS SAKIRUL SK HOUSE AT GOBINDAPUR _CFC |
150000 |
CONSTRUCTION OF CC ROAD FROM MARJINA BEWA HOUSE TOWARDS SAKIRUL SK HOUSE AT GOBINDAPUR _CFC1 |
Completion of work |
-
latitude : 24.9531185,24.9530833
Longitude : 88.1649292,88.1650768
file name : Image_02052022142141657.png
|
2022-05-02 14:21:41.752556 |
467 |
86817546 |
UPGRADATION OF CC ROAD FROM RUMPA GHOSH HOUSE TOWARDS GRAVEYARD AT GOPALPUR UNDER JADUPUR 2 GP |
350000 |
UPGRADATION OF CC ROAD FROM RUMPA GHOSH HOUSE TOWARDS GRAVEYARD AT GOPALPUR UNDER JADUPUR 2 GP1 |
Roof laid |
-
latitude : 24.973528292030096,24.973516766913235
Longitude : 88.15697070211172,88.1570012960583
file name : Image_15122023165237266.png
|
2023-12-15 16:52:37.344127 |
468 |
86817546 |
UPGRADATION OF CC ROAD FROM RUMPA GHOSH HOUSE TOWARDS GRAVEYARD AT GOPALPUR UNDER JADUPUR 2 GP |
350000 |
UPGRADATION OF CC ROAD FROM RUMPA GHOSH HOUSE TOWARDS GRAVEYARD AT GOPALPUR UNDER JADUPUR 2 GP1 |
Roof laid |
-
latitude : 24.97350364923477,24.973530555143952
Longitude : 88.15699215978384,88.15697715617716
file name : Image_15122023165038356.png
|
2023-12-15 16:50:38.431716 |
469 |
86817546 |
UPGRADATION OF CC ROAD FROM RUMPA GHOSH HOUSE TOWARDS GRAVEYARD AT GOPALPUR UNDER JADUPUR 2 GP |
350000 |
UPGRADATION OF CC ROAD FROM RUMPA GHOSH HOUSE TOWARDS GRAVEYARD AT GOPALPUR UNDER JADUPUR 2 GP1 |
Plinth level |
-
latitude : 24.973551090806723,24.973478838801384
Longitude : 88.1569629907608,88.15702275373042
file name : Image_15122023164758972.png
|
2023-12-15 16:47:59.061715 |
470 |
86817546 |
UPGRADATION OF CC ROAD FROM RUMPA GHOSH HOUSE TOWARDS GRAVEYARD AT GOPALPUR UNDER JADUPUR 2 GP |
350000 |
UPGRADATION OF CC ROAD FROM RUMPA GHOSH HOUSE TOWARDS GRAVEYARD AT GOPALPUR UNDER JADUPUR 2 GP1 |
Completion of work |
-
latitude : 24.974183002486825,24.974147714674473
Longitude : 88.15716826356947,88.15714730881155
file name : Image_04122023150518586.png
|
2023-12-04 15:05:18.656129 |
471 |
86817546 |
UPGRADATION OF CC ROAD FROM RUMPA GHOSH HOUSE TOWARDS GRAVEYARD AT GOPALPUR UNDER JADUPUR 2 GP |
350000 |
UPGRADATION OF CC ROAD FROM RUMPA GHOSH HOUSE TOWARDS GRAVEYARD AT GOPALPUR UNDER JADUPUR 2 GP1 |
Completion of work |
-
latitude : 24.974183002486825,24.974147714674473
Longitude : 88.15716826356947,88.15714730881155
file name : Image_04122023150427943.png
|
2023-12-04 15:04:28.014282 |
472 |
86817546 |
UPGRADATION OF CC ROAD FROM RUMPA GHOSH HOUSE TOWARDS GRAVEYARD AT GOPALPUR UNDER JADUPUR 2 GP |
350000 |
UPGRADATION OF CC ROAD FROM RUMPA GHOSH HOUSE TOWARDS GRAVEYARD AT GOPALPUR UNDER JADUPUR 2 GP1 |
Completion of work |
-
latitude : 24.975355,24.974183002486825
Longitude : 88.1552119,88.15716826356947
file name : Image_04122023150415399.png
|
2023-12-04 15:04:15.473903 |
473 |
86837729 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 24.959023743867874
Longitude : 88.16259671933949
file name : Image_28022024135956401.png
|
2024-02-28 13:59:56.467239 |
474 |
86837729 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.95899231173098
Longitude : 88.16265447065234
file name : Image_28022024135635410.png
|
2024-02-28 13:56:35.484043 |
475 |
86837729 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.95899243745953
Longitude : 88.16265271045268
file name : Image_28022024135256231.png
|
2024-02-28 13:52:56.302307 |
476 |
86837729 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.959004507400095
Longitude : 88.16266670823097
file name : Image_28022024134856869.png
|
2024-02-28 13:48:56.939088 |
477 |
67636177 |
Repairing and maintenance of roads |
200000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 24.937521354295313,24.937598635442555
Longitude : 88.13479931093752,88.13475706614554
file name : Image_07082024152503411.png
|
2024-08-07 15:25:03.559962 |
478 |
67636177 |
Repairing and maintenance of roads |
200000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 24.935610531829298,24.935600222088397
Longitude : 88.1355865392834,88.13560447655618
file name : Image_07082024150717348.png
|
2024-08-07 15:07:17.537165 |
479 |
67636177 |
Repairing and maintenance of roads |
200000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 24.935560785233974,24.935617363080382
Longitude : 88.13562450930476,88.13562476076186
file name : Image_07082024145443572.png
|
2024-08-07 14:54:45.022861 |
480 |
107404404 |
Construction of new Piped Water Supply schemes |
300000 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 24.97077085543424
Longitude : 88.15495912916958
file name : Image_16082024135338983.png
|
2024-08-16 13:53:39.059649 |
481 |
107404404 |
Construction of new Piped Water Supply schemes |
300000 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 24.970771023072302
Longitude : 88.1550516653806
file name : Image_16082024134103306.png
|
2024-08-16 13:41:03.389425 |
482 |
107404404 |
Construction of new Piped Water Supply schemes |
300000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 24.978772765025496
Longitude : 88.1540962960571
file name : Image_16082024133818483.png
|
2024-08-16 13:38:18.556584 |
483 |
68352121 |
Drinking water facility |
200000 |
Drinking water facility1 |
Roof laid |
-
latitude : 24.9739807
Longitude : 88.1543111
file name : Image_22082024164643123.png
|
2024-08-22 16:46:43.214256 |
484 |
68352121 |
Drinking water facility |
200000 |
Drinking water facility1 |
Plinth level |
-
latitude : 24.97364593204111
Longitude : 88.15418221056461
file name : Image_22082024163319781.png
|
2024-08-22 16:33:19.884999 |
485 |
68352121 |
Drinking water facility |
200000 |
Drinking water facility1 |
Completion of work |
-
latitude : 24.9739872
Longitude : 88.1543244
file name : Image_16082024155746787.png
|
2024-08-16 15:57:46.86638 |
486 |
67898250 |
Drinking water facilities |
300000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.965527555905282
Longitude : 88.14493596553802
file name : Image_06092024174956173.png
|
2024-09-06 17:50:45.654299 |
487 |
67898250 |
Drinking water facilities |
300000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.965544445440173
Longitude : 88.14495666883886
file name : Image_06092024174251257.png
|
2024-09-06 17:43:40.644671 |
488 |
67898250 |
Drinking water facilities |
300000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 24.965502619743347
Longitude : 88.14492607489228
file name : Image_16082024162714273.png
|
2024-08-16 16:27:14.345222 |
489 |
67651451 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.95908652432263
Longitude : 88.15303590148687
file name : Image_23082024173126983.png
|
2024-08-23 17:31:27.059993 |
490 |
67651451 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.958897763863206
Longitude : 88.15314972773194
file name : Image_23082024172714181.png
|
2024-08-23 17:27:14.252477 |
491 |
67651451 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.95888749603182
Longitude : 88.15314989537
file name : Image_16082024161205108.png
|
2024-08-16 16:12:05.175373 |
492 |
67651941 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.959309441037476
Longitude : 88.13113792799413
file name : Image_22082024174020705.png
|
2024-08-22 17:40:20.774239 |
493 |
67651941 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.959229645319283
Longitude : 88.13097322359681
file name : Image_22082024173641664.png
|
2024-08-22 17:36:41.732508 |
494 |
67651941 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.959315727464855
Longitude : 88.13117464073002
file name : Image_22082024173235942.png
|
2024-08-22 17:32:36.020441 |