1 |
35381435 |
Construction of CC road from Sukuruddin house to Mohosen house via Mannan Sk house CFC |
250000 |
Construction of CC road from Sukuruddin house to Mohosen house via Mannan Sk house CFC1 |
Roof laid |
-
latitude : 24.88515260629356,24.88512385636568
Longitude : 87.98696936108172,87.98692275770009
file name : Image_14012021141922025.png
|
2021-01-14 14:19:22.112538 |
2 |
35381435 |
Construction of CC road from Sukuruddin house to Mohosen house via Mannan Sk house CFC |
250000 |
Construction of CC road from Sukuruddin house to Mohosen house via Mannan Sk house CFC1 |
Roof laid |
-
latitude : 24.88510432653129,24.88509745337069
Longitude : 87.98686458729208,87.98660868778825
file name : Image_14012021142218065.png
|
2021-01-14 14:22:18.155737 |
3 |
35883374 |
Construction of CC Road from Karim House to Amfarul House CFC |
150000 |
Construction of CC Road from Karim House to Amfarul House CFC1 |
Completion of work |
-
latitude : 24.881421611644328,24.881681450642645
Longitude : 87.99952168017626,87.99951103515923
file name : Image_22012021114618125.png
|
2021-01-22 11:46:18.222641 |
4 |
35843117 |
Construction of Cement Concrete road from house of Nurul to house of Jiayul CFC |
250000 |
Construction of Cement Concrete road from house of Nurul to house of Jiayul CFC1 |
Completion of work |
-
latitude : 24.87040955107659,24.870272087864578
Longitude : 87.9909573867917,87.99063954502344
file name : Image_27012021113851018.png
|
2021-01-27 11:38:51.110517 |
5 |
35890265 |
Construction of Cement Concrete Road from house of Ghanasham Chowdhury to house of Gopal Chowdhury |
100000 |
Construction of Cement Concrete Road from house of Ghanasham Chowdhury to house of Gopal Chowdhury1 |
Completion of work |
-
latitude : 24.87457430921495,24.874567184597254
Longitude : 87.98143336549401,87.98143948428333
file name : Image_02022021123749549.png
|
2021-02-02 12:37:49.638821 |
6 |
35843352 |
Construction of Cement Concrete Road From house of Sammul Sk to house of Enamul Hoque CFC |
139000 |
Construction of Cement Concrete Road From house of Sammul Sk to house of Enamul Hoque CFC1 |
Completion of work |
-
latitude : 24.87709931563586,24.877084773033857
Longitude : 87.98614852130413,87.98623929731548
file name : Image_11082021144018102.png
|
2021-08-11 14:40:18.199524 |
7 |
35471472 |
Construction of cement Concrete Road form Atab munsi house to Kallu sk Hosue CFC |
174930 |
Construction of cement Concrete Road form Atab munsi house to Kallu sk Hosue CFC1 |
Completion of work |
-
latitude : 24.875643379054964,24.875629926100373
Longitude : 87.99247778020799,87.9924841504544
file name : Image_12022021124538122.png
|
2021-02-12 12:45:38.225795 |
8 |
35369884 |
Construction of CC Road from Matiur Rahaman house to Abul Raihan house CFC |
188000 |
Construction of CC Road from Matiur Rahaman house to Abul Raihan house CFC1 |
Completion of work |
-
latitude : 24.882270614616573,24.882250288501382
Longitude : 87.98728074878454,87.98730254173279
file name : Image_30032021121401143.png
|
2021-03-30 12:14:01.234453 |
9 |
35379496 |
Construction of CC Road from Nurul Mistri house to Mohosin house CFC |
154000 |
Construction of CC Road from Nurul Mistri house to Mohosin house CFC1 |
Completion of work |
-
latitude : 24.87808787729591,24.87805895972997
Longitude : 87.99714541062713,87.99712336622179
file name : Image_30032021121353872.png
|
2021-03-30 12:13:53.977276 |
10 |
35470292 |
Construction of CC road from NABARD road to Dukkhu Ghosh CFC |
196000 |
Construction of CC road from NABARD road to Dukkhu Ghosh CFC1 |
Completion of work |
-
latitude : 24.883588333333332,24.883588333333332
Longitude : 88.00561333333332,88.00561333333332
file name : Image_10122021121045579.png
|
2021-12-10 12:10:45.661943 |
11 |
35370382 |
Cons of CC Road from Md Anaul hoque house to Md Saikhul Mostafij house CFC |
250000 |
Cons of CC Road from Md Anaul hoque house to Md Saikhul Mostafij house CFC1 |
Completion of work |
-
latitude : 24.883243083022535,24.883214752189815
Longitude : 87.98819689080119,87.9882220365107
file name : Image_10052021150439923.png
|
2021-05-10 15:04:40.004346 |
12 |
35367951 |
Construction of cover Drain form Enamul house to Sattar Munsi house at Nasiruddin biswas Tola CFC |
350000 |
Construction of cover Drain form Enamul house to Sattar Munsi house at Nasiruddin biswas Tola CFC1 |
Completion of work |
-
latitude : 24.88217535428703,24.882180970162153
Longitude : 87.99646840430796,87.99647234380245
file name : Image_12052021152051541.png
|
2021-05-12 15:20:51.651316 |
13 |
39062906 |
Construction of Cover Drain from house of Hajit to house of Hajrat CFC |
250000 |
Construction of Cover Drain from house of Hajit to house of Hajrat CFC1 |
Completion of work |
-
latitude : 24.871546430513263,24.871546430513263
Longitude : 87.99087549559772,87.99087549559772
file name : Image_19052021101619310.png
|
2021-05-19 10:16:19.392222 |
14 |
35469734 |
Construction of Cover Drain form Alinagar jame masjid to Ataur (bhaggu)House at yakub tola CFC |
250000 |
Construction of Cover Drain form Alinagar jame masjid to Ataur (bhaggu)House at yakub tola CFC1 |
Completion of work |
-
latitude : 24.88342543132603,24.88342543132603
Longitude : 88.00354960374534,88.00354960374534
file name : Image_19052021101245370.png
|
2021-05-19 10:12:45.448148 |
15 |
35470992 |
Construction of Cover Drain from house of Ranjan Ghosh to house of Chaitanya Mandal CFC |
300000 |
Construction of Cover Drain from house of Ranjan Ghosh to house of Chaitanya Mandal CFC1 |
Completion of work |
-
latitude : 24.88260149024427,24.88260149024427
Longitude : 88.00770107656717,88.00770107656717
file name : Image_19052021101746705.png
|
2021-05-19 10:17:46.793908 |
16 |
35470992 |
Construction of Cover Drain from house of Ranjan Ghosh to house of Chaitanya Mandal CFC |
300000 |
Construction of Cover Drain from house of Ranjan Ghosh to house of Chaitanya Mandal CFC1 |
Completion of work |
-
latitude : 24.88260149024427,24.88260149024427
Longitude : 88.00770107656717,88.00770107656717
file name : Image_19052021101804724.png
|
2021-05-19 10:18:04.802795 |
17 |
39062849 |
Construction of cover drain from Dukkhu Sk house to Setab Sk house CFC |
250000 |
Construction of cover drain from Dukkhu Sk house to Setab Sk house CFC1 |
Completion of work |
-
latitude : 24.875370715744793,24.875339409336448
Longitude : 87.9919732734561,87.9919574316591
file name : Image_19052021100445769.png
|
2021-05-19 10:04:45.852849 |
18 |
39062849 |
Construction of cover drain from Dukkhu Sk house to Setab Sk house CFC |
250000 |
Construction of cover drain from Dukkhu Sk house to Setab Sk house CFC1 |
Completion of work |
-
latitude : 24.875370715744793,24.875339409336448
Longitude : 87.9919732734561,87.9919574316591
file name : Image_19052021100638443.png
|
2021-05-19 10:06:38.523757 |
19 |
39062836 |
Construction of cover drain from Baghu house towards Sadek house CFC |
300000 |
Construction of cover drain from Baghu house towards Sadek house CFC1 |
Completion of work |
-
latitude : 24.883473333333335,24.883473333333335
Longitude : 88.00355333333333,88.00355333333333
file name : Image_15022022144336618.png
|
2022-02-15 14:43:36.682495 |
20 |
35878811 |
Cleanning of Drain at Nabinagar |
150000 |
Cleanning of Drain at Nabinagar1 |
Plinth level |
-
latitude : 24.888321133330464,24.88826908171177
Longitude : 87.9885367769748,87.98854163847864
file name : Image_03092021120137659.png
|
2021-09-03 12:01:37.743513 |
21 |
35879440 |
Cleanning of Drain at Alinagar cfc |
150000 |
Cleanning of Drain at Alinagar cfc1 |
Roof laid |
-
latitude : 24.8859474202618,24.885995909571648
Longitude : 87.9935859516263,87.9936086665839
file name : Image_03092021171630539.png
|
2021-09-03 17:16:30.644155 |
22 |
35469458 |
Improvement of CC road form Samijuddin house to Abed sk house via Maiju house CFC |
200000 |
Improvement of CC road form Samijuddin house to Abed sk house via Maiju house CFC1 |
Completion of work |
-
latitude : 24.882738333333336,24.88270166666667
Longitude : 88.00379166666669,88.00383666666667
file name : Image_16092021163452724.png
|
2021-09-16 16:34:52.789081 |
23 |
35469819 |
Improvement of Cement concrete road Form house of Mainul Sk to house of Dillu Sk CFC |
200000 |
Improvement of Cement concrete road Form house of Mainul Sk to house of Dillu Sk CFC1 |
Completion of work |
-
latitude : 24.88243166666667,24.882423333333335
Longitude : 88.00462999999999,88.00460166666666
file name : Image_16092021164606751.png
|
2021-09-16 16:46:06.818279 |
24 |
35469819 |
Improvement of Cement concrete road Form house of Mainul Sk to house of Dillu Sk CFC |
200000 |
Improvement of Cement concrete road Form house of Mainul Sk to house of Dillu Sk CFC1 |
Completion of work |
-
latitude : 24.882394999999995,24.882394999999995
Longitude : 88.00454166666665,88.00470833333333
file name : Image_16092021164616237.png
|
2021-09-16 16:46:16.302195 |
25 |
35475492 |
Construction of Cement Concrete road from house of Jaheru to house of Hasimel cfc |
250000 |
Construction of Cement Concrete road from house of Jaheru to house of Hasimel cfc1 |
Completion of work |
-
latitude : 24.88243,24.873148333333333
Longitude : 88.004605,87.99067833333332
file name : Image_16092021171138947.png
|
2021-09-16 17:11:38.997339 |
26 |
35475492 |
Construction of Cement Concrete road from house of Jaheru to house of Hasimel cfc |
250000 |
Construction of Cement Concrete road from house of Jaheru to house of Hasimel cfc1 |
Completion of work |
-
latitude : 24.873135,24.873128333333337
Longitude : 87.99069333333334,87.990715
file name : Image_16092021171147813.png
|
2021-09-16 17:11:47.8684 |
27 |
39063035 |
Construction of Cover Drain From Amiruddin Tea Shope to house of Ajahar CFC |
280000 |
Construction of Cover Drain From Amiruddin Tea Shope to house of Ajahar CFC1 |
Completion of work |
-
latitude : 24.8855641,24.885891666666666
Longitude : 87.9810698,87.98696833333334
file name : Image_24092021114524137.png
|
2021-09-24 11:45:24.225152 |
28 |
39062920 |
Construction of Cover Drain from house of Nurhasan to house of Maslam CFC |
300000 |
Construction of Cover Drain from house of Nurhasan to house of Maslam CFC1 |
Completion of work |
-
latitude : 24.87192333333333,24.871940000000002
Longitude : 87.99065833333334,87.99067666666666
file name : Image_24092021171328039.png
|
2021-09-24 17:13:28.097755 |
29 |
35471355 |
Construction of CC Road form Jamal house to Anikul house Hosue CFC |
250000 |
Construction of CC Road form Jamal house to Anikul house Hosue CFC1 |
Completion of work |
-
latitude : 24.88234,24.882336666666667
Longitude : 88.00443833333333,88.00444166666666
file name : Image_28092021153947645.png
|
2021-09-28 15:39:47.715785 |
30 |
35369156 |
Construction of cover drain fron Ejajul house to Afrajul house CFC |
250000 |
Construction of cover drain fron Ejajul house to Afrajul house CFC1 |
Completion of work |
-
latitude : 24.88362833333333,24.88362833333333
Longitude : 87.99637,87.99637
file name : Image_28092021160048666.png
|
2021-09-28 16:00:48.730932 |
31 |
35379889 |
Construction of CC Road from Akramul house to Sariful house CFC |
200000 |
Construction of CC Road from Akramul house to Sariful house CFC1 |
Completion of work |
-
latitude : 24.881199,24.881199
Longitude : 87.9984027,87.9984027
file name : Image_28092021150832202.png
|
2021-09-28 15:08:32.265781 |
32 |
35891623 |
Construction of Cement concret road with cover Drain from Endraul house to Barik Hoque house CFC |
200000 |
Construction of Cement concret road with cover Drain from Endraul house to Barik Hoque house CFC1 |
Completion of work |
-
latitude : 24.882686666666668,24.882690000000004
Longitude : 87.99648333333334,87.99648166666665
file name : Image_28092021153951514.png
|
2021-09-28 15:39:51.615134 |
33 |
35384238 |
Construction of Cover Drain from Ebrahim Momin house to NABARD Road CFC |
200000 |
Construction of Cover Drain from Ebrahim Momin house to NABARD Road CFC1 |
Completion of work |
-
latitude : 24.886441666666663,24.886441666666663
Longitude : 87.99266833333334,87.99266833333334
file name : Image_28092021160054189.png
|
2021-09-28 16:00:54.261398 |
34 |
35470073 |
Installation of high mast tower at Nurnagar Kabaristhan CFC |
400000 |
Installation of high mast tower at Nurnagar Kabaristhan CFC1 |
Completion of work |
-
latitude : 24.887841666666667
Longitude : 87.99169166666667
file name : Image_28092021160059165.png
|
2021-09-28 16:00:59.370201 |
35 |
35882378 |
Construction of Cover Drain from Najirpur Jumma Masjid to Sohel Garage CFC |
300000 |
Construction of Cover Drain from Najirpur Jumma Masjid to Sohel Garage CFC1 |
Completion of work |
-
latitude : 24.885293,24.885293
Longitude : 87.9935484,87.9935484
file name : Image_28092021150828450.png
|
2021-09-28 15:08:28.510664 |
36 |
35384711 |
Construction of CC Road from Dhaklu House to Waktiy Masjid CFC |
250000 |
Construction of CC Road from Dhaklu House to Waktiy Masjid CFC1 |
Completion of work |
-
latitude : 24.881991666666668,24.881991666666668
Longitude : 87.99842500000001,87.99842500000001
file name : Image_28092021153943684.png
|
2021-09-28 15:39:43.760265 |
37 |
35843767 |
Construction of Cement Concrete Road from house of Nabin Chowdhury to house of Sunil Chowdhury CFC |
200000 |
Construction of Cement Concrete Road from house of Nabin Chowdhury to house of Sunil Chowdhury CFC1 |
Completion of work |
-
latitude : 24.874298333333332,24.874291666666668
Longitude : 87.98162666666667,87.98163500000001
file name : Image_16122021130212473.png
|
2021-12-16 13:02:12.536766 |
38 |
35470470 |
Construction of Cover Drain from house of Laxman Ghosh to house of Nur Hossain CFC |
250000 |
Construction of Cover Drain from house of Laxman Ghosh to house of Nur Hossain CFC1 |
Completion of work |
-
latitude : 24.883156666666665,24.883155000000002
Longitude : 88.00542833333333,88.00543333333331
file name : Image_06012022164609603.png
|
2022-01-06 16:46:09.710782 |
39 |
39062966 |
Construction of Cover Drain From house of Nausad Sk to house of Jamal Sk CFC |
250000 |
Construction of Cover Drain From house of Nausad Sk to house of Jamal Sk CFC1 |
Completion of work |
-
latitude : 24.87719666666667,24.877198333333332
Longitude : 87.98613666666667,87.98613333333333
file name : Image_06012022112709208.png
|
2022-01-06 11:27:09.326047 |
40 |
39063772 |
Construction of Tape Water Tank in front of Ainal Sk house cfc |
250000 |
Construction of Tape Water Tank in front of Ainal Sk house cfc1 |
Completion of work |
-
latitude : 24.878473333333332
Longitude : 87.98765666666668
file name : Image_20012022121939710.png
|
2022-01-20 12:19:39.822322 |
41 |
39062769 |
Construction of cover drain from Masjid Pond to house of Habiruddin CFC |
249990 |
Construction of cover drain from Masjid Pond to house of Habiruddin CFC1 |
Completion of work |
-
latitude : 24.8805003,24.8805003
Longitude : 87.9981052,87.9981052
file name : Image_25012022122617526.png
|
2022-01-25 12:26:17.619243 |
42 |
39063852 |
Construction of Tape Water Tank at Nabinagar Health Centre CFC |
250000 |
Construction of Tape Water Tank at Nabinagar Health Centre CFC1 |
Completion of work |
-
latitude : 24.881373333333332
Longitude : 87.98701000000001
file name : Image_20012022115749194.png
|
2022-01-20 11:57:49.31205 |
43 |
35368481 |
Construction of CC road with cover drain fron Asadul house to Waktiya Masjid CFC |
349965 |
Construction of CC road with cover drain fron Asadul house to Waktiya Masjid CFC1 |
Completion of work |
-
latitude : 24.8833613,24.8834242
Longitude : 87.9977944,87.9975827
file name : Image_16032022123002017.png
|
2022-03-16 12:30:02.153539 |
44 |
35380661 |
Construction of CC road from Jamal house to Bullu house via modern school CFC |
262000 |
Construction of CC road from Jamal house to Bullu house via modern school CFC1 |
Completion of work |
-
latitude : 24.884373215027153,24.884531716816127
Longitude : 87.99431283026934,87.99443663097918
file name : Image_19012021120124329.png
|
2021-01-19 12:01:24.419276 |
45 |
48973920 |
CONSTRUCTION OF WATER TANK ALINAGAR ISLAMIA MISSION INFRONT AT ALINAGAR TIED CFC |
195000 |
CONSTRUCTION OF WATER TANK ALINAGAR ISLAMIA MISSION INFRONT AT ALINAGAR TIED CFC1 |
Completion of work |
-
latitude : 24.877031666666667
Longitude : 87.99678833333334
file name : Image_27092022173957527.png
|
2022-09-27 17:39:57.610909 |
46 |
47338008 |
CONSTRUCTION OF C C ROAD WITH EARTH FILLING FROM AJIRUDDIN MANDAL HOUSE TO PALTU SK HOUSE AT SANSAD |
250000 |
CONSTRUCTION OF C C ROAD WITH EARTH FILLING FROM AJIRUDDIN MANDAL HOUSE TO PALTU SK HOUSE AT SANSAD 1 |
Completion of work |
-
latitude : 24.87965,24.87965
Longitude : 87.98931833333333,87.98931833333333
file name : Image_27092022174947209.png
|
2022-09-27 17:49:47.283764 |
47 |
47471113 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD XII UNTIED CFC |
200000 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD XII UNTIED CFC1 |
Completion of work |
-
latitude : 24.877373333333335
Longitude : 87.99380333333332
file name : Image_06072022171859841.png
|
2022-07-06 17:18:59.910001 |
48 |
47472659 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD VIII UNTIED CFC |
200000 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD VIII UNTIED CFC1 |
Completion of work |
-
latitude : 24.881960000000003
Longitude : 87.99840333333334
file name : Image_06072022171903406.png
|
2022-07-06 17:19:03.477809 |
49 |
47476919 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD XVI UNTIED CFC |
200000 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD XVI UNTIED CFC1 |
Completion of work |
-
latitude : 24.874563333333338
Longitude : 87.98161166666665
file name : Image_06072022171856478.png
|
2022-07-06 17:18:56.5482 |
50 |
48983144 |
CONSTRUCTION OF COVER HIGH DRAIN FROM OSMAN HOUSE TO AUTO STAND AT SANSAD XVII TIED CFC |
350000 |
CONSTRUCTION OF COVER HIGH DRAIN FROM OSMAN HOUSE TO AUTO STAND AT SANSAD XVII TIED CFC1 |
Completion of work |
-
latitude : 24.87494333333333,24.87494333333333,24.874934999999997
Longitude : 87.98551333333334,87.98551333333334,87.98550166666668
file name : Image_24062022140859436.png
|
2022-06-24 14:08:59.482026 |
51 |
47257570 |
CONSTRUCTION OF C C ROAD FROM SERAJUL HOUSE TO SATTAR HOUSE VIA TAHIR SK HOUSE AT SANSAD II UNTIED C |
300000 |
CONSTRUCTION OF C C ROAD FROM SERAJUL HOUSE TO SATTAR HOUSE VIA TAHIR SK HOUSE AT SANSAD II UNTIED C1 |
Completion of work |
-
latitude : 24.8833216,24.8833216
Longitude : 87.9971161,87.9971161
file name : Image_06072022171909753.png
|
2022-07-06 17:19:09.828365 |
52 |
47288437 |
CONSTRUCTION OF C C ROAD FROM ATIKUR HOUSE TO KABAR STHAN VIA SARIF HOUSE VIA MANTU HOUSE AT SANSADI |
250000 |
CONSTRUCTION OF C C ROAD FROM ATIKUR HOUSE TO KABAR STHAN VIA SARIF HOUSE VIA MANTU HOUSE AT SANSADI1 |
Completion of work |
-
latitude : 24.88310333333333,24.8832062
Longitude : 87.99734166666667,87.9976887
file name : Image_06072022171906562.png
|
2022-07-06 17:19:06.629732 |
53 |
47548194 |
CONSTRUCTION OF COVER DRAIN FROM SABIUL HOUSE TO JAME MASJID POND AT SANSAD V TIED CFC |
300000 |
CONSTRUCTION OF COVER DRAIN FROM SABIUL HOUSE TO JAME MASJID POND AT SANSAD V TIED CFC1 |
Completion of work |
-
latitude : 24.8803736,24.8803736
Longitude : 87.9978344,87.9978344
file name : Image_19072022170238975.png
|
2022-07-19 17:02:39.028461 |
54 |
47547520 |
CONSTRUCTION OF COVER DRAIN FROM YEASIN HOUSE TO KHURSED HOUSE AT SANSAD II TIED |
350000 |
CONSTRUCTION OF COVER DRAIN FROM YEASIN HOUSE TO KHURSED HOUSE AT SANSAD II TIED1 |
Completion of work |
-
latitude : 24.884998333333336,24.884998333333336
Longitude : 87.98746333333332,87.98746333333332
file name : Image_05082022141830619.png
|
2022-08-05 14:18:30.701844 |
55 |
47262702 |
CONSTRUCTION OF C C ROAD WITH EARTH FILLING FROM BARKAT HOUSE TO SIRAJ HOUSE AT SANSAD III UNTIED CF |
150000 |
CONSTRUCTION OF C C ROAD WITH EARTH FILLING FROM BARKAT HOUSE TO SIRAJ HOUSE AT SANSAD III UNTIED CF1 |
Completion of work |
-
latitude : 24.885133333333336,24.885143333333335
Longitude : 87.98781499999998,87.98781166666667
file name : Image_12082022143755936.png
|
2022-08-12 14:37:56.032313 |
56 |
35884995 |
Impv of Alinagar Play Ground by making Stage CFC |
300000 |
Impv of Alinagar Play Ground by making Stage CFC1 |
Completion of work |
-
latitude : 24.88354035,24.8835403
Longitude : 88.0018302,88.00183027
file name : Image_13012023174503071.png
|
2023-01-13 17:45:03.187468 |
57 |
48982303 |
CONSTRUCTION OF COVER DRAIN FROM KULESH GHOSH TO BUDDHU MOMIN AT SANSAD XI PBG CFC |
275000 |
CONSTRUCTION OF COVER DRAIN FROM KULESH GHOSH TO BUDDHU MOMIN AT SANSAD XI PBG CFC1 |
Completion of work |
-
latitude : 24.883255000000002,24.88323666666667
Longitude : 88.00584833333332,88.00584333333333
file name : Image_23082022135510137.png
|
2022-08-23 13:55:10.244516 |
58 |
48974496 |
CONSTRUCTION OF COMMUNITY LATRINE ALINAGAR JAME-MASJID INFRONT AT ALINAGAR TIED CFC |
350000 |
CONSTRUCTION OF COMMUNITY LATRINE ALINAGAR JAME-MASJID INFRONT AT ALINAGAR TIED CFC1 |
Completion of work |
-
latitude : 24.88365414
Longitude : 88.00380208
file name : Image_13012023174459850.png
|
2023-01-13 17:44:59.973665 |
59 |
64839168 |
Construction of Concrete road from house of Kuddus to house of Hajibul at Nabinagar under Alinagar G |
290000 |
Construction of Concrete road from house of Kuddus to house of Hajibul at Nabinagar under Alinagar G1 |
Completion of work |
-
latitude : 24.88555815,24.88555811
Longitude : 87.98760717,87.98760715
file name : Image_13022023132107420.png
|
2023-02-13 13:21:07.496377 |
60 |
64839206 |
Construction of Concrete road from house of Yeashin sardar to house of Kashim via Panchu House at Na |
200000 |
Construction of Concrete road from house of Yeashin sardar to house of Kashim via Panchu House at Na1 |
Completion of work |
-
latitude : 24.88654702,24.88654702
Longitude : 87.98770255,87.98770255
file name : Image_13022023131056196.png
|
2023-02-13 13:10:56.264213 |
61 |
47337647 |
CONSTRUCTION OF C C ROAD WITH EARTH FILLING FROM JAKIR HOUSE TO SAKI HOIUSE AT SANSAD XII UNTIED CFC |
200000 |
CONSTRUCTION OF C C ROAD WITH EARTH FILLING FROM JAKIR HOUSE TO SAKI HOIUSE AT SANSAD XII UNTIED CFC1 |
Completion of work |
-
latitude : 24.87714068,24.87714107
Longitude : 87.99261082,87.99261176
file name : Image_03022023124636043.png
|
2023-02-03 12:46:36.14562 |
62 |
64839497 |
Construction of Concrete road from house of ojed to house of Kaimul at Nabinagar under Alinagar GP |
225000 |
Construction of Concrete road from house of ojed to house of Kaimul at Nabinagar under Alinagar GP1 |
Completion of work |
-
latitude : 24.88087788,24.88087788
Longitude : 87.99100349,87.99100353
file name : Image_08022023111252698.png
|
2023-02-08 11:12:52.79136 |
63 |
47475166 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD X UNTIED CFC |
240000 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD X UNTIED CFC1 |
Completion of work |
-
latitude : 24.8841257
Longitude : 88.0025052
file name : Image_08022023113916263.png
|
2023-02-08 11:39:16.377947 |
64 |
47471630 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD XI UNTIED CFC |
240000 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD XI UNTIED CFC1 |
Completion of work |
-
latitude : 24.88147678
Longitude : 88.00886649
file name : Image_08022023114608422.png
|
2023-02-08 11:46:08.55669 |
65 |
47474215 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD V UNTIED CFC |
240000 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD V UNTIED CFC1 |
Completion of work |
-
latitude : 24.87791379
Longitude : 87.99647906
file name : Image_08022023112524029.png
|
2023-02-08 11:25:24.145147 |
66 |
64840809 |
Construction of Concrete road from house of Johak to house of Badhru house at Panchutola under Ali |
150000 |
Construction of Concrete road from house of Johak to house of Badhru house at Panchutola under Ali1 |
Completion of work |
-
latitude : 24.8812468,24.8812468
Longitude : 87.9983817,87.9983817
file name : Image_08022023113146901.png
|
2023-02-08 11:31:47.001004 |
67 |
47548819 |
CONSRTUCTION OF COVER DRAIN FROM JAME MASJID TO ROUF HARDWERE SHOP AT SANSAD VI TIED CFC |
350000 |
CONSRTUCTION OF COVER DRAIN FROM JAME MASJID TO ROUF HARDWERE SHOP AT SANSAD VI TIED CFC1 |
Completion of work |
-
latitude : 24.88508575,24.885311
Longitude : 87.99404329,87.9935492
file name : Image_10022023142628366.png
|
2023-02-10 14:26:28.45365 |
68 |
72153887 |
Drainage Construction |
350000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.885011666666667
Longitude : 87.98754333333333
file name : Image_03122024154817144.png
|
2024-12-03 15:48:17.23238 |
69 |
72153887 |
Drainage Construction |
350000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.885025000000002
Longitude : 87.98742666666666
file name : Image_02122024124019270.png
|
2024-12-02 12:40:19.36653 |
70 |
72153887 |
Drainage Construction |
350000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.885904
Longitude : 87.9934608
file name : Image_30082024165707926.png
|
2024-08-30 16:57:08.760367 |
71 |
72185302 |
Drainage Construction |
350000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.883441666666666
Longitude : 87.996785
file name : Image_10122024163212800.png
|
2024-12-10 16:32:12.884576 |
72 |
72185302 |
Drainage Construction |
350000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.883441666666666
Longitude : 87.99676666666667
file name : Image_10122024124557897.png
|
2024-12-10 12:45:57.993571 |
73 |
72185302 |
Drainage Construction |
350000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.8833072
Longitude : 87.9974939
file name : Image_30082024171817669.png
|
2024-08-30 17:18:18.01909 |
74 |
72156642 |
Drainage Construction |
350000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.88468833333333
Longitude : 87.98773000000001
file name : Image_07112024133538100.png
|
2024-11-07 13:35:38.199484 |
75 |
72156642 |
Drainage Construction |
350000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.88463
Longitude : 87.98772
file name : Image_21102024144054372.png
|
2024-10-21 14:40:54.468428 |
76 |
72156642 |
Drainage Construction |
350000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.885904
Longitude : 87.9934608
file name : Image_30082024165152814.png
|
2024-08-30 16:51:53.572507 |
77 |
64895280 |
Water Supply to villages |
300000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.88786708,24.8878668
Longitude : 87.99174387,87.99174401
file name : Image_22022023163801376.png
|
2023-02-22 16:38:01.485158 |
78 |
64839871 |
Construction of Concrete road from house of Samful to house of Raja via matin house at Panchutola u |
150000 |
Construction of Concrete road from house of Samful to house of Raja via matin house at Panchutola u1 |
Completion of work |
-
latitude : 24.88198225,24.88197815
Longitude : 87.99869798,87.99870068
file name : Image_22022023163823362.png
|
2023-02-22 16:38:23.443101 |
79 |
64895355 |
Water Supply to villages |
300000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.8747338,24.87473381
Longitude : 87.98543628,87.98543627
file name : Image_09032023122737757.png
|
2023-03-09 12:27:37.850676 |
80 |
64895167 |
Water Supply to villages |
350000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.88580797,24.88580372
Longitude : 87.98751389,87.98750977
file name : Image_06032023140234073.png
|
2023-03-06 14:02:34.161643 |
81 |
64839512 |
Construction of Concrete road from house of Mainul to house of Sakir at Nurnagar under Alinagar G |
175000 |
Construction of Concrete road from house of Mainul to house of Sakir at Nurnagar under Alinagar G1 |
Completion of work |
-
latitude : 24.8846807,24.8846807
Longitude : 87.9970732,87.9970732
file name : Image_08032023123421899.png
|
2023-03-08 12:34:21.98561 |
82 |
64839543 |
Construction of Concrete road from house of tajiruddin to house of Rejjak at Nurnagar under Alinaga |
99000 |
Construction of Concrete road from house of tajiruddin to house of Rejjak at Nurnagar under Alinaga1 |
Completion of work |
-
latitude : 24.8833079,24.8833079
Longitude : 87.997331,87.997331
file name : Image_08032023123413028.png
|
2023-03-08 12:34:13.137637 |
83 |
64839474 |
Construction of Concrete road from house of Rintu to Nabard road via Mahibur house to Nabard Road at |
200000 |
Construction of Concrete road from house of Rintu to Nabard road via Mahibur house to Nabard Road at1 |
Plinth level |
-
latitude : 24.8831854,24.8831854
Longitude : 87.9978264,87.9978264
file name : Image_12042023233504894.png
|
2023-04-12 23:35:04.988462 |
84 |
66954454 |
Construction of Concrete road from house of Mahidur to faridul house at Nur Nagar |
220000 |
Construction of Concrete road from house of Mahidur to faridul house at Nur Nagar1 |
Roof laid |
-
latitude : 24.88450896,24.88450896
Longitude : 87.99782909,87.99782909
file name : Image_15052023132016794.png
|
2023-05-15 13:20:16.898441 |
85 |
58381113 |
CONSTRUCTION WATER TANK INFRONT DUBU SK AT CHAMA TOLA |
150000 |
CONSTRUCTION WATER TANK INFRONT DUBU SK AT CHAMA TOLA1 |
Roof laid |
-
latitude : 24.87255293
Longitude : 87.98436614
file name : Image_19042023224602189.png
|
2023-04-19 22:46:02.276503 |
86 |
58409377 |
CONSTRUCTION OF COVER DRAIN FROM ENTAJ HOUSE TO RAUF DR MEDICAL SHOP AT ALINAGAR |
350000 |
CONSTRUCTION OF COVER DRAIN FROM ENTAJ HOUSE TO RAUF DR MEDICAL SHOP AT ALINAGAR1 |
Roof laid |
-
latitude : 24.88258813,24.88258813
Longitude : 87.99720248,87.99720243
file name : Image_19042023224617465.png
|
2023-04-19 22:46:17.533422 |
87 |
58405913 |
CONSTRUCTION OF COVER DRAIN FROM OSMAN TO JUMA MASJID AT SANSAD XVII TIED CFC |
350000 |
CONSTRUCTION OF COVER DRAIN FROM OSMAN TO JUMA MASJID AT SANSAD XVII TIED CFC1 |
Roof laid |
-
latitude : 24.8744703,24.8744703
Longitude : 87.9856879,87.9856879
file name : Image_19042023224609543.png
|
2023-04-19 22:46:09.620188 |
88 |
58379432 |
CONSTRUCTION OF C C ROAD FROM NABARD ROAD TO ID -GAHA VIA SANJUR AND ESARAJUL SARDAR AT NABINAGAR |
170000 |
CONSTRUCTION OF C C ROAD FROM NABARD ROAD TO ID -GAHA VIA SANJUR AND ESARAJUL SARDAR AT NABINAGAR1 |
Roof laid |
-
latitude : 24.88718338,24.88718337
Longitude : 87.9869623,87.9869623
file name : Image_19042023224556017.png
|
2023-04-19 22:45:56.099456 |
89 |
58370116 |
CONSTRUCTION OF CC ROAD FROM MASHIBUL HOUSE TO MANTU VIA RABIUL AT SANSAD V |
250000 |
CONSTRUCTION OF CC ROAD FROM MASHIBUL HOUSE TO MANTU VIA RABIUL AT SANSAD V1 |
Roof laid |
-
latitude : 24.88125357,24.88125212
Longitude : 87.99784005,87.99783934
file name : Image_16052023124923569.png
|
2023-05-16 12:49:23.663805 |
90 |
58402643 |
CONSTRUCTION OF COMMUNITY LATRINE SOBUJ PATHSALA AT NABINAGAR UTTAR TIED |
350000 |
CONSTRUCTION OF COMMUNITY LATRINE SOBUJ PATHSALA AT NABINAGAR UTTAR TIED1 |
Roof laid |
-
latitude : 24.88620496
Longitude : 87.98795084
file name : Image_19052023224420178.png
|
2023-05-19 22:44:20.265547 |
91 |
66954927 |
Creation of a new source of drinking water |
215000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.88073639
Longitude : 87.99006807
file name : Image_23052023151908218.png
|
2023-05-23 15:19:08.316865 |
92 |
58331236 |
CONSTRUCTION OF CC ROAD FROM AFSAR HOUSE TO KAIMUL AT NABINAGAR |
350000 |
CONSTRUCTION OF CC ROAD FROM AFSAR HOUSE TO KAIMUL AT NABINAGAR1 |
Roof laid |
-
latitude : 24.88021843,24.88021843
Longitude : 87.99076205,87.990762
file name : Image_23052023151924803.png
|
2023-05-23 15:19:24.895954 |
93 |
58370754 |
CONSTRUCTION OF CC ROAD FROM KOYA SHOP TO SATIL SHOP AT SANSAD VIII |
210000 |
CONSTRUCTION OF CC ROAD FROM KOYA SHOP TO SATIL SHOP AT SANSAD VIII1 |
Roof laid |
-
latitude : 24.88263544,24.88263544
Longitude : 87.99962374,87.99962374
file name : Image_22052023230222656.png
|
2023-05-22 23:02:22.735291 |
94 |
64895095 |
Water Supply to villages |
350000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 24.88776839,24.88776839
Longitude : 87.98735394,87.98735394
file name : Image_22052023230136513.png
|
2023-05-22 23:01:36.598792 |
95 |
58334126 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD XIV UNTIED CFC |
99000 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD XIV UNTIED CFC1 |
Completion of work |
-
latitude : 24.8858336
Longitude : 87.9933341
file name : Image_19072023125337245.png
|
2023-07-19 12:53:37.338039 |
96 |
58375500 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD III UNTIED CFC |
99000 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD III UNTIED CFC1 |
Completion of work |
-
latitude : 24.8881147
Longitude : 87.987858
file name : Image_19072023125340719.png
|
2023-07-19 12:53:40.833386 |
97 |
58392798 |
CONSTRUCTION OF COVER DRAIN FROM NURFUL TO ABUL MANDAL AT SANSAD III TIED CFC |
290000 |
CONSTRUCTION OF COVER DRAIN FROM NURFUL TO ABUL MANDAL AT SANSAD III TIED CFC1 |
Roof laid |
-
latitude : 24.88214086,24.88214162
Longitude : 87.98706184,87.98706849
file name : Image_26062023214502007.png
|
2023-06-26 21:45:02.100362 |
98 |
66954161 |
Construction of Concrete road from house of Matibul house to Senaul at Nabinagar |
93500 |
Construction of Concrete road from house of Matibul house to Senaul at Nabinagar1 |
Plinth level |
-
latitude : 24.88712224,24.88712224
Longitude : 87.98778391,87.98778391
file name : Image_26062023214429903.png
|
2023-06-26 21:44:30.000289 |
99 |
66954221 |
Construction of Concrete road from house of Karim Master to Bablu house at Nabinagar |
100100 |
Construction of Concrete road from house of Karim Master to Bablu house at Nabinagar1 |
Roof laid |
-
latitude : 24.88400432,24.88400377
Longitude : 87.98737526,87.98737556
file name : Image_26062023214437695.png
|
2023-06-26 21:44:37.78607 |
100 |
66954073 |
Construction of Concrete road from house of Bajaul house to Hafijul at Nabinagar |
100100 |
Construction of Concrete road from house of Bajaul house to Hafijul at Nabinagar1 |
Plinth level |
-
latitude : 24.88215927,24.88215927
Longitude : 87.98705472,87.98705472
file name : Image_26062023214518638.png
|
2023-06-26 21:45:18.732845 |
101 |
66953751 |
Construction of Concrete road from house of Arsed House to Dulu at Nabinagar |
102000 |
Construction of Concrete road from house of Arsed House to Dulu at Nabinagar1 |
Plinth level |
-
latitude : 24.88267694,24.88267619
Longitude : 87.98737668,87.98737782
file name : Image_26062023214444877.png
|
2023-06-26 21:44:44.968937 |
102 |
66953821 |
Construction of Concrete road from house of Hakim house to Koyesh at Nabinagar |
95400 |
Construction of Concrete road from house of Hakim house to Koyesh at Nabinagar1 |
Plinth level |
-
latitude : 24.88217254,24.88217254
Longitude : 87.98705843,87.98705843
file name : Image_26062023214533650.png
|
2023-06-26 21:45:33.748499 |
103 |
58406742 |
CONSTRUCTION OF DUSTBINE NABINAGAR HEALTH CENTRE AT NABINAGAR |
76000 |
CONSTRUCTION OF DUSTBINE NABINAGAR HEALTH CENTRE AT NABINAGAR1 |
Roof laid |
-
latitude : 24.88123875
Longitude : 87.98696316
file name : Image_04072023114308132.png
|
2023-07-04 11:43:08.225575 |
104 |
64895340 |
Water Supply to villages |
350000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.8742178
Longitude : 87.98872774
file name : Image_04072023114933353.png
|
2023-07-04 11:49:33.447758 |
105 |
58373336 |
CONSTRUCTION OF CC ROAD FROM AMINUL HOUSE TO SOLIMUDDIN AT SANSAD II |
99500 |
CONSTRUCTION OF CC ROAD FROM AMINUL HOUSE TO SOLIMUDDIN AT SANSAD II1 |
Completion of work |
-
latitude : 24.8844391,24.8844391
Longitude : 87.9973472,87.9973472
file name : Image_04072023132406952.png
|
2023-07-04 13:24:07.049587 |
106 |
58374781 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD II UNTIED CFC |
99000 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD II UNTIED CFC1 |
Completion of work |
-
latitude : 24.8838701
Longitude : 87.99805186
file name : Image_13072023225551545.png
|
2023-07-13 22:55:51.688045 |
107 |
58367310 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD IX UNTIED CFC |
99500 |
INSTALLATION OF SOLAR LIGHT IN DIFFARENT PLACE AT SANSAD IX UNTIED CFC1 |
Completion of work |
-
latitude : 24.88249269
Longitude : 87.99841123
file name : Image_04072023132839843.png
|
2023-07-04 13:28:39.935055 |
108 |
58401545 |
CONSTRUCTION WATER TANK INFRONT GHOSH PARA KALI MANDIR AT SANSAD XI |
150000 |
CONSTRUCTION WATER TANK INFRONT GHOSH PARA KALI MANDIR AT SANSAD XI1 |
Completion of work |
-
latitude : 24.8818042
Longitude : 88.00639126
file name : Image_27072023210017824.png
|
2023-07-27 21:00:17.941921 |
109 |
58408778 |
CONST OF NEW CONECTION TUBEWELL ALL SANSAD UNDER ALINAGAR GP |
99800 |
CONST OF NEW CONECTION TUBEWELL ALL SANSAD UNDER ALINAGAR GP 1 |
Completion of work |
-
latitude : 24.88360408
Longitude : 88.00080312
file name : Image_19072023125619952.png
|
2023-07-19 12:56:20.058946 |
110 |
58408778 |
CONST OF NEW CONECTION TUBEWELL ALL SANSAD UNDER ALINAGAR GP |
99800 |
CONST OF NEW CONECTION TUBEWELL ALL SANSAD UNDER ALINAGAR GP 1 |
Completion of work |
-
latitude : 24.88359611
Longitude : 88.00079514
file name : Image_19072023125818331.png
|
2023-07-19 12:58:18.41734 |
111 |
64895182 |
Water Supply to villages |
300000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.88265404,24.88265298
Longitude : 87.99704238,87.99704186
file name : Image_07082023140021539.png
|
2023-08-07 14:00:21.626091 |
112 |
66954321 |
Construction of Concrete road from house of Nabart Road to Subhas house at Babupara |
99500 |
Construction of Concrete road from house of Nabart Road to Subhas house at Babupara1 |
Completion of work |
-
latitude : 24.883469,24.883469
Longitude : 88.0009563,88.0009563
file name : Image_07082023140001182.png
|
2023-08-07 14:00:01.293072 |
113 |
66954032 |
Construction of Concrete road from house of Chand master house to Rashid at Nabinagar |
99000 |
Construction of Concrete road from house of Chand master house to Rashid at Nabinagar1 |
Completion of work |
-
latitude : 24.88262215,24.88262212
Longitude : 87.9873347,87.98733473
file name : Image_07082023140041791.png
|
2023-08-07 14:00:41.880539 |
114 |
66954108 |
Construction of Concrete road from house of Tipu sultan house to Nurul at Nabinagar |
99000 |
Construction of Concrete road from house of Tipu sultan house to Nurul at Nabinagar1 |
Completion of work |
-
latitude : 24.88242793,24.88242798
Longitude : 87.98730534,87.98730535
file name : Image_07082023140031047.png
|
2023-08-07 14:00:31.135784 |
115 |
58381911 |
CONSTRUCTION OF COVER DRAIN FROM ATIKUR HOUSE TO NABARD ROAD AT SANSAD IX TIED CFC |
300000 |
CONSTRUCTION OF COVER DRAIN FROM ATIKUR HOUSE TO NABARD ROAD AT SANSAD IX TIED CFC1 |
Completion of work |
-
latitude : 24.88249964,24.88249964
Longitude : 87.9980404,87.9980404
file name : Image_07082023140012993.png
|
2023-08-07 14:00:13.085788 |
116 |
58393506 |
CONSTRUCTION OF COVER DRAIN FROM MATIN TO SAIDUL HOUSE AT SANSAD III TIED CFC |
350000 |
CONSTRUCTION OF COVER DRAIN FROM MATIN TO SAIDUL HOUSE AT SANSAD III TIED CFC1 |
Completion of work |
-
latitude : 24.88631034,24.88631034
Longitude : 87.98766727,87.98766727
file name : Image_07082023140026606.png
|
2023-08-07 14:00:26.704056 |
117 |
58329548 |
CONSTRUCTION OF CC ROAD FROM AJED SK HOUSE TO AFSAR HOUSE AT NABINAGAR |
250000 |
CONSTRUCTION OF CC ROAD FROM AJED SK HOUSE TO AFSAR HOUSE AT NABINAGAR1 |
Completion of work |
-
latitude : 24.87970362,24.87970811
Longitude : 87.99024034,87.99024418
file name : Image_09082023171644843.png
|
2023-08-09 17:16:44.94131 |
118 |
66954589 |
Creation of a new source of drinking water |
215000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.8832157
Longitude : 87.9975611
file name : Image_09082023171639909.png
|
2023-08-09 17:16:40.071176 |
119 |
66955137 |
Creation of a new source of drinking water |
215000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.88704323
Longitude : 87.9865569
file name : Image_09082023202533162.png
|
2023-08-09 20:25:33.24748 |
120 |
66955137 |
Creation of a new source of drinking water |
215000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.88704323
Longitude : 87.9865569
file name : Image_09082023202444284.png
|
2023-08-09 20:24:44.372133 |
121 |
58399290 |
CONSTRUCTION WATER TANK INFRONT FATE PUR KALIMANDIR AT SANSAD XI |
150000 |
CONSTRUCTION WATER TANK INFRONT FATE PUR KALIMANDIR AT SANSAD XI1 |
Completion of work |
-
latitude : 24.8813954
Longitude : 88.00890208
file name : Image_09082023161111115.png
|
2023-08-09 16:11:11.224399 |
122 |
58325836 |
CONSTRUCTION OF C C ROAD FROM NIMAI HOUSE TO SIPEN HOUSE AT CHAMATOLA |
350000 |
CONSTRUCTION OF C C ROAD FROM NIMAI HOUSE TO SIPEN HOUSE AT CHAMATOLA1 |
Completion of work |
-
latitude : 24.8740282,24.8740282
Longitude : 87.9811325,87.9811325
file name : Image_09082023202501685.png
|
2023-08-09 20:25:01.764226 |
123 |
58325836 |
CONSTRUCTION OF C C ROAD FROM NIMAI HOUSE TO SIPEN HOUSE AT CHAMATOLA |
350000 |
CONSTRUCTION OF C C ROAD FROM NIMAI HOUSE TO SIPEN HOUSE AT CHAMATOLA1 |
Completion of work |
-
latitude : 24.8740282,24.8740282
Longitude : 87.9811325,87.9811325
file name : Image_09082023171657426.png
|
2023-08-09 17:16:57.518886 |
124 |
58325836 |
CONSTRUCTION OF C C ROAD FROM NIMAI HOUSE TO SIPEN HOUSE AT CHAMATOLA |
350000 |
CONSTRUCTION OF C C ROAD FROM NIMAI HOUSE TO SIPEN HOUSE AT CHAMATOLA1 |
Completion of work |
-
latitude : 24.8740284,24.8740284
Longitude : 87.9811329,87.9811329
file name : Image_09082023171653185.png
|
2023-08-09 17:16:53.278822 |
125 |
58325836 |
CONSTRUCTION OF C C ROAD FROM NIMAI HOUSE TO SIPEN HOUSE AT CHAMATOLA |
350000 |
CONSTRUCTION OF C C ROAD FROM NIMAI HOUSE TO SIPEN HOUSE AT CHAMATOLA1 |
Completion of work |
-
latitude : 24.8740282,24.8740282
Longitude : 87.9811327,87.9811327
file name : Image_09082023171648829.png
|
2023-08-09 17:16:48.928463 |
126 |
39062858 |
Construction of Cover Drain from Jumma Masjid to house of Muktar Sk CFC |
300000 |
Construction of Cover Drain from Jumma Masjid to house of Muktar Sk CFC1 |
Completion of work |
-
latitude : 24.87162,24.87162
Longitude : 87.990925,87.990925
file name : Image_23022022152521246.png
|
2022-02-23 15:25:21.311271 |
127 |
66954884 |
Creation of a new source of drinking water |
215000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.88055316
Longitude : 87.99706673
file name : Image_16102023145530902.png
|
2023-10-16 14:55:31.000052 |
128 |
66954884 |
Creation of a new source of drinking water |
215000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.88056483
Longitude : 87.99702655
file name : Image_16102023145102871.png
|
2023-10-16 14:51:02.947239 |
129 |
66954884 |
Creation of a new source of drinking water |
215000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.88065309
Longitude : 87.99707879
file name : Image_01092023152251325.png
|
2023-09-01 15:22:51.41707 |
130 |
66954675 |
Creation of a new source of drinking water |
215000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.8825514
Longitude : 87.99887768
file name : Image_13122023145456180.png
|
2023-12-13 14:54:56.317303 |
131 |
66954675 |
Creation of a new source of drinking water |
215000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.88248032
Longitude : 87.99888123
file name : Image_16102023144106108.png
|
2023-10-16 14:41:06.20641 |
132 |
66954675 |
Creation of a new source of drinking water |
215000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.88250743
Longitude : 87.99894303
file name : Image_01092023152300821.png
|
2023-09-01 15:23:00.908504 |
133 |
66954675 |
Creation of a new source of drinking water |
215000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.88255074
Longitude : 87.9989468
file name : Image_01092023152246659.png
|
2023-09-01 15:22:46.746209 |
134 |
58404254 |
CONSTRUCTION WATER TANK INFRONT ASMAUL HOQUE AT SANSAD XIV |
150000 |
CONSTRUCTION WATER TANK INFRONT ASMAUL HOQUE AT SANSAD XIV1 |
Roof laid |
-
latitude : 24.88113293
Longitude : 87.99100828
file name : Image_11102023125129482.png
|
2023-10-11 12:51:29.569603 |
135 |
58404254 |
CONSTRUCTION WATER TANK INFRONT ASMAUL HOQUE AT SANSAD XIV |
150000 |
CONSTRUCTION WATER TANK INFRONT ASMAUL HOQUE AT SANSAD XIV1 |
Plinth level |
-
latitude : 24.88113434
Longitude : 87.9909762
file name : Image_11102023124632874.png
|
2023-10-11 12:46:32.952213 |
136 |
58404254 |
CONSTRUCTION WATER TANK INFRONT ASMAUL HOQUE AT SANSAD XIV |
150000 |
CONSTRUCTION WATER TANK INFRONT ASMAUL HOQUE AT SANSAD XIV1 |
Completion of work |
-
latitude : 24.88115207
Longitude : 87.99100931
file name : Image_01092023152256478.png
|
2023-09-01 15:22:56.568276 |
137 |
58390303 |
CONSTRUCTION OF COVER DRAIN FROM EFRAJUL TO EJAJUL AT SANSAD X TIED CFC |
300000 |
CONSTRUCTION OF COVER DRAIN FROM EFRAJUL TO EJAJUL AT SANSAD X TIED CFC1 |
Roof laid |
-
latitude : 24.88295298,24.88295298
Longitude : 88.00097969,88.00097969
file name : Image_17102023113808918.png
|
2023-10-17 11:38:09.002543 |
138 |
58390303 |
CONSTRUCTION OF COVER DRAIN FROM EFRAJUL TO EJAJUL AT SANSAD X TIED CFC |
300000 |
CONSTRUCTION OF COVER DRAIN FROM EFRAJUL TO EJAJUL AT SANSAD X TIED CFC1 |
Plinth level |
-
latitude : 24.8836725,24.8836725
Longitude : 88.0009882,88.0009882
file name : Image_16102023143550870.png
|
2023-10-16 14:35:50.964884 |
139 |
58390303 |
CONSTRUCTION OF COVER DRAIN FROM EFRAJUL TO EJAJUL AT SANSAD X TIED CFC |
300000 |
CONSTRUCTION OF COVER DRAIN FROM EFRAJUL TO EJAJUL AT SANSAD X TIED CFC1 |
Plinth level |
-
latitude : 24.8836725,24.8836725
Longitude : 88.0009882,88.0009882
file name : Image_16102023143547192.png
|
2023-10-16 14:35:47.292693 |
140 |
58390303 |
CONSTRUCTION OF COVER DRAIN FROM EFRAJUL TO EJAJUL AT SANSAD X TIED CFC |
300000 |
CONSTRUCTION OF COVER DRAIN FROM EFRAJUL TO EJAJUL AT SANSAD X TIED CFC1 |
Completion of work |
-
latitude : 24.88293049,24.88290741
Longitude : 88.0010635,88.00106981
file name : Image_01092023152241627.png
|
2023-09-01 15:22:41.714543 |
141 |
72191282 |
Instalation of Sanitation vending machine and incinerators |
100000 |
Instalation of Sanitation vending machine and incinerators1 |
|
-
latitude : 24.8858724
Longitude : 87.9933857
file name : Image_30012024152005469.png
|
2024-01-30 15:20:05.557254 |
142 |
72054212 |
Construction of roads |
98901 |
Construction of roads1 |
Roof laid |
-
latitude : 24.88251815,24.88251815
Longitude : 87.99805971,87.9980597
file name : Image_02012024144701453.png
|
2024-01-02 14:47:01.540283 |
143 |
72054212 |
Construction of roads |
98901 |
Construction of roads1 |
Plinth level |
-
latitude : 24.88247154,24.88247154
Longitude : 87.99805095,87.99805095
file name : Image_31122023103805102.png
|
2023-12-31 10:38:05.179233 |
144 |
72054212 |
Construction of roads |
98901 |
Construction of roads1 |
Plinth level |
-
latitude : 24.8858171,24.8858171
Longitude : 87.993305,87.993305
file name : Image_21122023134231246.png
|
2023-12-21 13:42:31.334187 |
145 |
72054212 |
Construction of roads |
98901 |
Construction of roads1 |
Completion of work |
-
latitude : 24.8824898,24.8824898
Longitude : 87.99803662,87.99803662
file name : Image_16122023105951458.png
|
2023-12-16 10:59:51.544804 |
146 |
72048738 |
Construction of roads |
99000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.88462813,24.88462813
Longitude : 87.98804676,87.98804676
file name : Image_02042024133434380.png
|
2024-04-02 13:34:34.472313 |
147 |
72048738 |
Construction of roads |
99000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.88461299,24.88461307
Longitude : 87.98807263,87.98807256
file name : Image_02042024133006653.png
|
2024-04-02 13:30:06.75322 |
148 |
72048738 |
Construction of roads |
99000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.88464422,24.8846443
Longitude : 87.9880453,87.98804537
file name : Image_21122023134234791.png
|
2023-12-21 13:42:34.884606 |
149 |
72069985 |
Installation of Computer with Internet facility |
100000 |
Installation of Computer with Internet facility1 |
|
-
latitude : 24.8858834
Longitude : 87.993401
file name : Image_16022024183853484.png
|
2024-02-16 18:38:53.563281 |
150 |
58391398 |
CONSTRUCTION OF COVER DRAIN FROM AMADUL TO INTAJ AT SANSAD II TIED CFC |
350000 |
CONSTRUCTION OF COVER DRAIN FROM AMADUL TO INTAJ AT SANSAD II TIED CFC1 |
Roof laid |
-
latitude : 24.8831846,24.8831846
Longitude : 87.9978085,87.9978085
file name : Image_16022024183641587.png
|
2024-02-16 18:36:41.669689 |
151 |
58391398 |
CONSTRUCTION OF COVER DRAIN FROM AMADUL TO INTAJ AT SANSAD II TIED CFC |
350000 |
CONSTRUCTION OF COVER DRAIN FROM AMADUL TO INTAJ AT SANSAD II TIED CFC1 |
Plinth level |
-
latitude : 24.8833128,24.8833128
Longitude : 87.9974092,87.9974092
file name : Image_16022024113650447.png
|
2024-02-16 11:36:50.582425 |
152 |
58391398 |
CONSTRUCTION OF COVER DRAIN FROM AMADUL TO INTAJ AT SANSAD II TIED CFC |
350000 |
CONSTRUCTION OF COVER DRAIN FROM AMADUL TO INTAJ AT SANSAD II TIED CFC1 |
Completion of work |
-
latitude : 24.8833893,24.8833893
Longitude : 87.9973643,87.9973643
file name : Image_28012024132921367.png
|
2024-01-28 13:29:21.450519 |
153 |
58386937 |
CONSTRUCTION OF COVER DRAIN FROM MABUD TO AYESH MORE AT SANSAD VIII TIED CFC |
350000 |
CONSTRUCTION OF COVER DRAIN FROM MABUD TO AYESH MORE AT SANSAD VIII TIED CFC1 |
Roof laid |
-
latitude : 24.8831846,24.8831846
Longitude : 87.9978085,87.9978085
file name : Image_16022024183638185.png
|
2024-02-16 18:36:38.26625 |
154 |
58386937 |
CONSTRUCTION OF COVER DRAIN FROM MABUD TO AYESH MORE AT SANSAD VIII TIED CFC |
350000 |
CONSTRUCTION OF COVER DRAIN FROM MABUD TO AYESH MORE AT SANSAD VIII TIED CFC1 |
Plinth level |
-
latitude : 24.8833112,24.8833112
Longitude : 87.9974051,87.9974051
file name : Image_16022024113654491.png
|
2024-02-16 11:36:54.603205 |
155 |
58386937 |
CONSTRUCTION OF COVER DRAIN FROM MABUD TO AYESH MORE AT SANSAD VIII TIED CFC |
350000 |
CONSTRUCTION OF COVER DRAIN FROM MABUD TO AYESH MORE AT SANSAD VIII TIED CFC1 |
Completion of work |
-
latitude : 24.8833249,24.8833249
Longitude : 87.9974541,87.9974541
file name : Image_28012024132917265.png
|
2024-01-28 13:29:17.343308 |
156 |
72012887 |
Construction of roads |
250000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.88320347,24.88320347
Longitude : 87.99310691,87.99310691
file name : Image_22012024162722396.png
|
2024-01-22 16:27:22.469881 |
157 |
72012887 |
Construction of roads |
250000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.8946416,24.8946416
Longitude : 87.9874841,87.9874841
file name : Image_19012024142905364.png
|
2024-01-19 14:29:05.455413 |
158 |
72012887 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.88326121,24.88326121
Longitude : 87.993004,87.993004
file name : Image_21122023112510859.png
|
2023-12-21 11:25:10.988325 |
159 |
71988689 |
Construction of roads |
220000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.87743651,24.87743643
Longitude : 87.98977879,87.9897788
file name : Image_06022024120610989.png
|
2024-02-06 12:06:11.081272 |
160 |
71988689 |
Construction of roads |
220000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.877238,24.877238
Longitude : 87.9896588,87.9896588
file name : Image_31012024134222989.png
|
2024-01-31 13:42:23.070804 |
161 |
71988689 |
Construction of roads |
220000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.87772849,24.87772849
Longitude : 87.98973845,87.98973845
file name : Image_21122023112507907.png
|
2023-12-21 11:25:07.993841 |
162 |
72025437 |
Construction of roads |
250000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.87028082,24.87028084
Longitude : 87.99973085,87.9997309
file name : Image_04012024124536191.png
|
2024-01-04 12:45:36.285177 |
163 |
72025437 |
Construction of roads |
250000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.87011978,24.87081493
Longitude : 87.99971548,87.99980977
file name : Image_02012024105233296.png
|
2024-01-02 10:52:33.393567 |
164 |
72025437 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.87091727,24.87091733
Longitude : 87.99981467,87.99981472
file name : Image_18122023115827118.png
|
2023-12-18 11:58:27.210561 |
165 |
72160000 |
Drainage Construction |
350000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.8866788
Longitude : 87.9925164
file name : Image_26012024170537199.png
|
2024-01-26 17:05:37.288318 |
166 |
72160000 |
Drainage Construction |
350000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.88715513
Longitude : 87.99221085
file name : Image_21122023112516841.png
|
2023-12-21 11:25:16.948276 |
167 |
71701120 |
Construction of roads |
175000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.8848935,24.8848935
Longitude : 88.0029071,88.0029071
file name : Image_02012024151422995.png
|
2024-01-02 15:14:23.110848 |
168 |
71701120 |
Construction of roads |
175000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.88488445,24.88488288
Longitude : 88.00301831,88.00301797
file name : Image_02012024145539721.png
|
2024-01-02 14:55:39.81528 |
169 |
71701120 |
Construction of roads |
175000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.88320794,24.88320728
Longitude : 87.99308172,87.99308234
file name : Image_31122023104244709.png
|
2023-12-31 10:42:44.790354 |
170 |
71701120 |
Construction of roads |
175000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.88482618,24.88482618
Longitude : 88.00295426,88.00295426
file name : Image_21122023112513893.png
|
2023-12-21 11:25:13.992578 |
171 |
72180920 |
Drainage Construction |
265000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.883805
Longitude : 88.00052333333333
file name : Image_20082024163445703.png
|
2024-08-20 16:34:45.804719 |
172 |
72180920 |
Drainage Construction |
265000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.883754999999997
Longitude : 88.00054166666665
file name : Image_12082024122318655.png
|
2024-08-12 12:23:18.744202 |
173 |
72180920 |
Drainage Construction |
265000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.8839
Longitude : 88.00038
file name : Image_07082024121552656.png
|
2024-08-07 12:15:52.741919 |
174 |
71830470 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.885358333333336,24.88527
Longitude : 87.99453166666666,87.99464166666667
file name : Image_18112024152104216.png
|
2024-11-18 15:21:04.33284 |
175 |
71830470 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.885354999999997,24.885321666666663
Longitude : 87.994535,87.99462666666668
file name : Image_30102024124424166.png
|
2024-10-30 12:44:24.25094 |
176 |
71830470 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.8859387,24.8859387
Longitude : 87.9935583,87.9935583
file name : Image_05072024171406346.png
|
2024-07-05 17:14:06.447929 |
177 |
72017667 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.95038763,24.95039405
Longitude : 88.01029251,88.01029608
file name : Image_24052024213533300.png
|
2024-05-24 21:35:33.386235 |
178 |
72017667 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.8764415,24.87644583
Longitude : 87.98683809,87.98684121
file name : Image_04012024125605428.png
|
2024-01-04 12:56:05.514037 |
179 |
72017667 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.87652735,24.87652735
Longitude : 87.98672474,87.98672474
file name : Image_04012024124729054.png
|
2024-01-04 12:47:29.224998 |
180 |
72017667 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.87648038,24.87648038
Longitude : 87.98667997,87.98667997
file name : Image_31122023103810391.png
|
2023-12-31 10:38:10.465477 |
181 |
71699824 |
Construction of roads |
99000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.8814667,24.8814667
Longitude : 87.9983425,87.9983425
file name : Image_02012024144705458.png
|
2024-01-02 14:47:05.620237 |
182 |
71699824 |
Construction of roads |
99000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.8814667,24.8814667
Longitude : 87.9983425,87.9983425
file name : Image_02012024144657726.png
|
2024-01-02 14:46:57.803825 |
183 |
71699824 |
Construction of roads |
99000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.8858555,24.8858555
Longitude : 87.9934144,87.9934144
file name : Image_21122023145825787.png
|
2023-12-21 14:58:25.870726 |
184 |
71699824 |
Construction of roads |
99000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.88218013,24.88218041
Longitude : 87.99843454,87.99843459
file name : Image_16122023105947822.png
|
2023-12-16 10:59:47.904725 |
185 |
97355578 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.8815035
Longitude : 87.9983308
file name : Image_07092024141130295.png
|
2024-09-07 14:12:36.067049 |
186 |
97364028 |
Construction of roads |
160000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.877956666666666,24.877936666666663
Longitude : 87.98984999999999,87.98983166666667
file name : Image_05112024164128007.png
|
2024-11-05 16:41:28.094063 |
187 |
97364028 |
Construction of roads |
160000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.877954999999996,24.877953333333334
Longitude : 87.98983500000001,87.98983833333332
file name : Image_05112024165220639.png
|
2024-11-05 16:52:20.721917 |
188 |
97364028 |
Construction of roads |
160000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.87802166666667,24.878041666666665
Longitude : 87.98991499999998,87.98991166666669
file name : Image_09102024145044886.png
|
2024-10-09 14:50:44.964989 |
189 |
97364028 |
Construction of roads |
160000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.8756731,24.8756731
Longitude : 87.9891768,87.9891768
file name : Image_07092024135632466.png
|
2024-09-07 13:57:38.022178 |
190 |
97364321 |
Construction of roads |
140000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.8859155,24.8859155
Longitude : 87.993529,87.993529
file name : Image_27112024155846981.png
|
2024-11-27 15:58:47.061459 |
191 |
97364321 |
Construction of roads |
140000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.8858957,24.8858957
Longitude : 87.9935498,87.9935498
file name : Image_25112024164009001.png
|
2024-11-25 16:40:09.110296 |
192 |
97364321 |
Construction of roads |
140000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.8833217,24.883136666666662
Longitude : 87.9970798,87.996845
file name : Image_07092024142535924.png
|
2024-09-07 14:26:41.871443 |
193 |
97366523 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.880393333333338,24.880393333333338
Longitude : 87.98658166666668,87.98658166666668
file name : Image_05112024170524307.png
|
2024-11-05 17:05:24.397685 |
194 |
97366523 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.880488333333332,24.880418333333335
Longitude : 87.98664,87.98657833333333
file name : Image_02102024170049097.png
|
2024-10-02 17:00:49.192049 |
195 |
97366523 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.8770668,24.8770668
Longitude : 87.9863649,87.9863649
file name : Image_07092024133645594.png
|
2024-09-07 13:37:50.891487 |
196 |
97367109 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.877335000000002,24.877333333333333
Longitude : 87.98622666666667,87.98622833333333
file name : Image_05112024165911380.png
|
2024-11-05 16:59:11.457984 |
197 |
97367109 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.877336666666665,24.87737666666667
Longitude : 87.98620666666666,87.98617833333334
file name : Image_05112024105444240.png
|
2024-11-05 10:54:44.328187 |
198 |
97367109 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.87742166666667,24.87742166666667
Longitude : 87.98618833333333,87.98618833333333
file name : Image_02112024160136231.png
|
2024-11-02 16:01:36.091439 |
199 |
97367109 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.87734833333333,24.8770677
Longitude : 87.98624999999998,87.9863659
file name : Image_07092024132428481.png
|
2024-09-07 13:25:33.629828 |
200 |
97364947 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.8859155,24.8859155
Longitude : 87.993529,87.993529
file name : Image_27112024155503545.png
|
2024-11-27 15:55:03.638051 |
201 |
97364947 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.8858431,24.8858431
Longitude : 87.9934954,87.9934954
file name : Image_20112024163734937.png
|
2024-11-20 16:37:35.048482 |
202 |
97364947 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.883981666666667,24.884008333333334
Longitude : 87.99718999999999,87.99712666666667
file name : Image_07092024143327053.png
|
2024-09-07 14:34:33.101321 |
203 |
58362571 |
CONSTRUCTION OF C C ROAD FROM MANTU HOUSE TO NABARD VIA SENTU LAND AT SANASD IX |
235000 |
CONSTRUCTION OF C C ROAD FROM MANTU HOUSE TO NABARD VIA SENTU LAND AT SANASD IX1 |
Roof laid |
-
latitude : 24.8859329,24.8859334
Longitude : 87.9935628,87.9935624
file name : Image_07092024165742509.png
|
2024-09-07 16:58:50.51253 |
204 |
58362571 |
CONSTRUCTION OF C C ROAD FROM MANTU HOUSE TO NABARD VIA SENTU LAND AT SANASD IX |
235000 |
CONSTRUCTION OF C C ROAD FROM MANTU HOUSE TO NABARD VIA SENTU LAND AT SANASD IX1 |
Roof laid |
-
latitude : 24.88252356,24.88252356
Longitude : 87.99769008,87.99769008
file name : Image_23062023173843329.png
|
2023-06-23 17:38:43.416828 |
205 |
72007224 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.8799666,24.8799666
Longitude : 88.0070399,88.0070399
file name : Image_15072024170721834.png
|
2024-07-15 17:07:21.922564 |
206 |
72007224 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.8799664,24.8799664
Longitude : 88.0070364,88.0070364
file name : Image_14072024184112171.png
|
2024-07-14 18:41:12.307633 |
207 |
72007224 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.8799664,24.8799664
Longitude : 88.0070364,88.0070364
file name : Image_14072024184058095.png
|
2024-07-14 18:40:58.229203 |
208 |
72007224 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.8799661,24.8799661
Longitude : 88.0070287,88.0070287
file name : Image_22062024133211604.png
|
2024-06-22 13:32:11.699818 |
209 |
72004560 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.883290000000002,24.88328333333333
Longitude : 88.00585333333332,88.005865
file name : Image_15072024170439706.png
|
2024-07-15 17:04:39.800787 |
210 |
72004560 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.8837483,24.8837483
Longitude : 88.0056546,88.0056546
file name : Image_14072024184105950.png
|
2024-07-14 18:41:06.036573 |
211 |
72004560 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.880313333333334,24.880313333333334
Longitude : 88.00684833333335,88.00684833333335
file name : Image_22062024134319852.png
|
2024-06-22 13:43:19.98901 |
212 |
72009741 |
Construction of roads |
160000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.883401666666668,24.883399999999998
Longitude : 88.00052,88.00052166666667
file name : Image_15072024170059897.png
|
2024-07-15 17:00:59.987057 |
213 |
72009741 |
Construction of roads |
160000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.883593333333337,24.88356666666667
Longitude : 88.000595,88.00061499999998
file name : Image_13072024140945642.png
|
2024-07-13 14:09:45.734644 |
214 |
72009741 |
Construction of roads |
160000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.883523333333333,24.883523333333333
Longitude : 88.00059666666667,88.00059666666667
file name : Image_22062024125117168.png
|
2024-06-22 12:51:17.246946 |
215 |
72019445 |
Construction of roads |
175000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.877336,24.877336
Longitude : 87.9888308,87.9888308
file name : Image_30072024170623350.png
|
2024-07-30 17:06:23.451293 |
216 |
72019445 |
Construction of roads |
175000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.8859262,24.8859262
Longitude : 87.9935402,87.9935402
file name : Image_27072024131053525.png
|
2024-07-27 13:10:53.610241 |
217 |
72019445 |
Construction of roads |
175000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.8773383,24.8773383
Longitude : 87.9888282,87.9888282
file name : Image_24062024173910849.png
|
2024-06-24 17:39:10.94761 |
218 |
72176143 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 24.8841289
Longitude : 88.0032401
file name : Image_20082024160319713.png
|
2024-08-20 16:03:19.867106 |
219 |
72176143 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 25.0015552
Longitude : 88.1412093
file name : Image_07082024120537631.png
|
2024-08-07 12:05:37.750284 |
220 |
72176143 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.8836278
Longitude : 88.0005379
file name : Image_22062024130736628.png
|
2024-06-22 13:07:36.715714 |
221 |
72230530 |
Drinking water facilities |
600000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.8858617
Longitude : 87.9934499
file name : Image_07082024130054006.png
|
2024-08-07 13:00:54.090439 |
222 |
72230530 |
Drinking water facilities |
600000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.874405000000003
Longitude : 87.98381333333333
file name : Image_12072024124226700.png
|
2024-07-12 12:42:26.789004 |
223 |
72230530 |
Drinking water facilities |
600000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 24.874381666666668
Longitude : 87.98381166666668
file name : Image_22062024112821939.png
|
2024-06-22 11:28:21.821242 |
224 |
72174384 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 24.8736893
Longitude : 87.9928341
file name : Image_28082024120842364.png
|
2024-08-28 12:08:42.549195 |
225 |
72174384 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 24.8736921
Longitude : 87.9928483
file name : Image_07082024133431798.png
|
2024-08-07 13:34:31.895004 |
226 |
72174384 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.8747155
Longitude : 87.9881176
file name : Image_22062024120229882.png
|
2024-06-22 12:02:29.980752 |
227 |
72221860 |
Repair of drainage channel |
99500 |
Repair of drainage channel1 |
Roof laid |
-
latitude : 24.8835949
Longitude : 87.9876241
file name : Image_15072024164549306.png
|
2024-07-15 16:45:49.413079 |
228 |
72221860 |
Repair of drainage channel |
99500 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 24.8814588
Longitude : 87.9867823
file name : Image_15072024120343326.png
|
2024-07-15 12:03:43.425588 |
229 |
72221860 |
Repair of drainage channel |
99500 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 24.8858844
Longitude : 87.9933857
file name : Image_10072024171115295.png
|
2024-07-10 17:11:15.392701 |
230 |
72221860 |
Repair of drainage channel |
99500 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 24.883595
Longitude : 87.9876333
file name : Image_05072024171854364.png
|
2024-07-05 17:18:54.464235 |
231 |
72223492 |
Repair of drainage channel |
99500 |
Repair of drainage channel1 |
Roof laid |
-
latitude : 24.883595
Longitude : 87.9876333
file name : Image_15072024164957049.png
|
2024-07-15 16:49:57.140253 |
232 |
72223492 |
Repair of drainage channel |
99500 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 24.8835949
Longitude : 87.9876241
file name : Image_15072024164234389.png
|
2024-07-15 16:42:34.482774 |
233 |
72223492 |
Repair of drainage channel |
99500 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 24.8835958
Longitude : 87.987633
file name : Image_10072024171118952.png
|
2024-07-10 17:11:19.048062 |
234 |
72223492 |
Repair of drainage channel |
99500 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 24.88311666666667
Longitude : 87.987435
file name : Image_05072024171858093.png
|
2024-07-05 17:18:58.173469 |
235 |
72227625 |
Drinking water facility |
600000 |
Drinking water facility1 |
Roof laid |
-
latitude : 24.885155
Longitude : 87.98817666666667
file name : Image_09092024173839305.png
|
2024-09-09 17:40:26.206333 |
236 |
72227625 |
Drinking water facility |
600000 |
Drinking water facility1 |
Plinth level |
-
latitude : 24.874278333333336
Longitude : 87.98362
file name : Image_07082024132038899.png
|
2024-08-07 13:20:38.986167 |
237 |
72227625 |
Drinking water facility |
600000 |
Drinking water facility1 |
Completion of work |
-
latitude : 24.885113333333333
Longitude : 87.98814499999999
file name : Image_27072024135941382.png
|
2024-07-27 13:59:41.500574 |
238 |
72077596 |
Procurement of Furniture |
100000 |
Procurement of Furniture1 |
|
-
latitude : 24.8859432
Longitude : 87.9935555
file name : Image_14072024181610848.png
|
2024-07-14 18:16:10.948575 |
239 |
72023545 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.8831454,24.8831454
Longitude : 87.997858,87.997858
file name : Image_19112024140714652.png
|
2024-11-19 14:07:14.743044 |
240 |
72023545 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.883086,24.8830925
Longitude : 87.9978189,87.9978081
file name : Image_04112024164229572.png
|
2024-11-04 16:42:29.334486 |
241 |
72023545 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.88332666666667,24.88332666666667
Longitude : 87.99785500000002,87.99785500000002
file name : Image_24062024181354272.png
|
2024-06-24 18:13:54.365904 |
242 |
72158261 |
Drainage Construction |
248000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.8841692
Longitude : 87.9872455
file name : Image_28112024171829753.png
|
2024-11-28 17:18:29.843209 |
243 |
72158261 |
Drainage Construction |
248000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.884141666666665
Longitude : 87.98737666666666
file name : Image_14112024170258494.png
|
2024-11-14 17:02:58.640397 |
244 |
72158261 |
Drainage Construction |
248000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.884035
Longitude : 87.98735166666665
file name : Image_24062024173738686.png
|
2024-06-24 17:37:38.773514 |
245 |
97363393 |
Construction of roads |
140000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.8841658,24.8841879
Longitude : 88.0042778,88.0043832
file name : Image_05112024172939286.png
|
2024-11-05 17:29:39.36822 |
246 |
97363393 |
Construction of roads |
140000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.8841883,24.8841982
Longitude : 88.0043746,88.0044203
file name : Image_04102024170233668.png
|
2024-10-04 17:02:33.763218 |
247 |
97363393 |
Construction of roads |
140000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.8841883,24.8841872
Longitude : 88.0043746,88.0043608
file name : Image_07092024144508570.png
|
2024-09-07 14:46:14.274413 |
248 |
39062817 |
Construction of Community Latrine at Najirpur Bazar CFC |
600000 |
Construction of Community Latrine at Najirpur Bazar CFC1 |
Roof laid |
-
latitude : 24.8858569
Longitude : 87.9934483
file name : Image_08082024152307733.png
|
2024-08-08 15:23:07.833247 |
249 |
39062817 |
Construction of Community Latrine at Najirpur Bazar CFC |
600000 |
Construction of Community Latrine at Najirpur Bazar CFC1 |
Plinth level |
-
latitude : 24.8858533
Longitude : 87.9934428
file name : Image_08082024151907849.png
|
2024-08-08 15:19:07.956738 |
250 |
39062817 |
Construction of Community Latrine at Najirpur Bazar CFC |
600000 |
Construction of Community Latrine at Najirpur Bazar CFC1 |
Completion of work |
-
latitude : 24.88599448464811
Longitude : 87.99344186671078
file name : Image_30072021183418138.png
|
2021-07-30 18:34:18.243264 |
251 |
35367441 |
Reparing of Cover Drain form Jiaul Shop to Muktar House at Nasiruddin biswas Tola CFC |
200000 |
Reparing of Cover Drain form Jiaul Shop to Muktar House at Nasiruddin biswas Tola CFC1 |
Completion of work |
-
latitude : 24.88246333333333,24.882465000000003
Longitude : 87.996455,87.99645833333334
file name : Image_28092021153955234.png
|
2021-09-28 15:39:55.318482 |
252 |
35367441 |
Reparing of Cover Drain form Jiaul Shop to Muktar House at Nasiruddin biswas Tola CFC |
200000 |
Reparing of Cover Drain form Jiaul Shop to Muktar House at Nasiruddin biswas Tola CFC1 |
Completion of work |
-
latitude : 24.88247666666667,24.882481666666664
Longitude : 87.99644500000001,87.99644666666667
file name : Image_28092021153958985.png
|
2021-09-28 15:39:59.06065 |
253 |
72229150 |
Drinking water facility |
600000 |
Drinking water facility1 |
Roof laid |
-
latitude : 24.8745994
Longitude : 87.9870613
file name : Image_18032024113637912.png
|
2024-03-18 11:36:38.076062 |
254 |
72229150 |
Drinking water facility |
600000 |
Drinking water facility1 |
Plinth level |
-
latitude : 24.8745971
Longitude : 87.9870608
file name : Image_18032024113133178.png
|
2024-03-18 11:31:33.274285 |
255 |
72229150 |
Drinking water facility |
600000 |
Drinking water facility1 |
Completion of work |
-
latitude : 24.8746459
Longitude : 87.9871608
file name : Image_21122023112504929.png
|
2023-12-21 11:25:05.030924 |
256 |
97350142 |
Drainage Construction |
550000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.8859223
Longitude : 87.9935622
file name : Image_29102024152335703.png
|
2024-10-29 15:23:35.794689 |
257 |
72226071 |
Drinking water facilities |
600000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.88440333333333
Longitude : 87.99551333333332
file name : Image_29112024163225161.png
|
2024-11-29 16:32:25.277826 |
258 |
72226071 |
Drinking water facilities |
600000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.884378333333334
Longitude : 87.99558333333334
file name : Image_07092024151351851.png
|
2024-09-07 15:14:58.444828 |
259 |
72226071 |
Drinking water facilities |
600000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 24.8843068
Longitude : 87.9950445
file name : Image_20082024154446719.png
|
2024-08-20 15:44:46.815663 |
260 |
97363829 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.882726666666667,24.88271666666667
Longitude : 88.00601,88.00601499999999
file name : Image_03122024160619953.png
|
2024-12-03 16:06:20.042148 |
261 |
97363829 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.8837131,24.8837131
Longitude : 88.0056189,88.0056189
file name : Image_01122024123216795.png
|
2024-12-01 12:32:16.870108 |
262 |
97363829 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.88275833333333,24.88275
Longitude : 88.00610499999999,88.00614166666668
file name : Image_07092024145506875.png
|
2024-09-07 14:56:13.250284 |
263 |
97354015 |
Purchase of Sanitary Pad Incinerator |
200000 |
Purchase of Sanitary Pad Incinerator1 |
Roof laid |
-
latitude : 24.886043333333337
Longitude : 87.99356833333334
file name : Image_03122024145941937.png
|
2024-12-03 14:59:42.020421 |
264 |
97354015 |
Purchase of Sanitary Pad Incinerator |
200000 |
Purchase of Sanitary Pad Incinerator1 |
Plinth level |
-
latitude : 24.886059999999997
Longitude : 87.99353833333335
file name : Image_03122024143342805.png
|
2024-12-03 14:33:42.903475 |
265 |
97354015 |
Purchase of Sanitary Pad Incinerator |
200000 |
Purchase of Sanitary Pad Incinerator1 |
Completion of work |
-
latitude : 24.885995
Longitude : 87.99345833333334
file name : Image_03122024132859841.png
|
2024-12-03 13:28:59.972969 |
266 |
97353727 |
Purchase of Sanitary Pad Dispenser |
500000 |
Purchase of Sanitary Pad Dispenser1 |
Roof laid |
-
latitude : 24.886
Longitude : 87.99354833333334
file name : Image_03122024145937167.png
|
2024-12-03 14:59:37.289799 |
267 |
97353727 |
Purchase of Sanitary Pad Dispenser |
500000 |
Purchase of Sanitary Pad Dispenser1 |
Plinth level |
-
latitude : 24.886045
Longitude : 87.99354833333334
file name : Image_03122024143334772.png
|
2024-12-03 14:33:34.8646 |
268 |
97353727 |
Purchase of Sanitary Pad Dispenser |
500000 |
Purchase of Sanitary Pad Dispenser1 |
Completion of work |
-
latitude : 24.88603833333333
Longitude : 87.99351666666668
file name : Image_03122024132856988.png
|
2024-12-03 13:28:57.075948 |
269 |
97392244 |
Purchase/ installtion of various Equipments |
305880 |
Purchase/ installtion of various Equipments1 |
Roof laid |
-
latitude : 24.88602166666667,24.886014999999997
Longitude : 87.99351666666668,87.99351999999999
file name : Image_03122024145927116.png
|
2024-12-03 14:59:27.20332 |
270 |
97392244 |
Purchase/ installtion of various Equipments |
305880 |
Purchase/ installtion of various Equipments1 |
Plinth level |
-
latitude : 24.885968333333334,24.885965000000002
Longitude : 87.99358833333332,87.99357666666668
file name : Image_03122024143505231.png
|
2024-12-03 14:35:05.323048 |
271 |
97392244 |
Purchase/ installtion of various Equipments |
305880 |
Purchase/ installtion of various Equipments1 |
Completion of work |
-
latitude : 24.886014999999997,24.88604666666667
Longitude : 87.99356833333334,87.99357333333334
file name : Image_03122024132902625.png
|
2024-12-03 13:29:02.71593 |
272 |
72169830 |
Drainage Construction |
350000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.874961666666664
Longitude : 87.98414333333334
file name : Image_15072024114949800.png
|
2024-07-15 11:49:49.886845 |
273 |
72169830 |
Drainage Construction |
350000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.87507333333333
Longitude : 87.98409666666666
file name : Image_10072024171609737.png
|
2024-07-10 17:16:09.820396 |
274 |
72169830 |
Drainage Construction |
350000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.874996666666668
Longitude : 87.98409666666666
file name : Image_22062024112951929.png
|