1 |
35665713 |
Installation of highmast light post infront Kartik Mandal House at Anandanagar CFC BG |
100000 |
Installation of highmast light post infront Kartik Mandal House at Anandanagar CFC BG1 |
Roof laid |
-
latitude : 24.96945984195918
Longitude : 88.20978063158691
file name : Image_07082022102033379.png
|
2022-08-07 10:20:33.514312 |
2 |
35569781 |
Installation of high mast solar light post in front of Binod Das at Mahadebpur Purba CFC BG |
100000 |
Installation of high mast solar light post in front of Binod Das at Mahadebpur Purba CFC BG1 |
Roof laid |
-
latitude : 24.96998320799321
Longitude : 88.2196865323931
file name : Image_07082022102047618.png
|
2022-08-07 10:20:47.736919 |
3 |
35587581 |
Consruction of cc road from Main Road towards Ananda Biswas House at Najarpur CFC BG |
70000 |
Consruction of cc road from Main Road towards Ananda Biswas House at Najarpur CFC BG 1 |
Roof laid |
-
latitude : 24.96479912661016,24.964833157137036
Longitude : 88.22811093181372,88.22810866869986
file name : Image_02082022141234030.png
|
2022-08-02 14:12:34.230197 |
4 |
35593834 |
Construction of Cc road from Prabhat Pramanik House towards Niranjan Shil House at Najarpur CFC BG |
50000 |
Construction of Cc road from Prabhat Pramanik House towards Niranjan Shil House at Najarpur CFC BG1 |
Roof laid |
-
latitude : 24.968032906763256,24.968011952005327
Longitude : 88.22731113061309,88.22727902792394
file name : Image_02082022134542869.png
|
2022-08-02 13:45:42.977749 |
5 |
47027355 |
INSTALLATION OF HIGH MAST LIGHT POST AT BURIMA TOLA AT D CHAR LAXMIPUR PBG SFC |
100000 |
INSTALLATION OF HIGH MAST LIGHT POST AT BURIMA TOLA AT D CHAR LAXMIPUR PBG SFC1 |
Roof laid |
-
latitude : 24.96755004
Longitude : 88.23904041
file name : Image_31122022150008278.png
|
2022-12-31 15:00:08.424551 |
6 |
35668799 |
Construction of cc road from Anukul Sarkar towards Manab Sarkar at dakshin char laxmipur UNTIED |
325000 |
Construction of cc road from Anukul Sarkar towards Manab Sarkar at dakshin char laxmipur UNTIED1 |
Roof laid |
-
latitude : 24.96961897239089,24.96961897239089
Longitude : 88.23924025520682,88.23924025520682
file name : Image_19032021160158664.png
|
2021-03-19 16:01:58.858405 |
7 |
35536713 |
Construction of cc road from Botol Mandal towards Manik Mandal at Mahadebpur Purba CFC BG UNTIED |
100000 |
Construction of cc road from Botol Mandal towards Manik Mandal at Mahadebpur Purba CFC BG UNTIED1 |
Roof laid |
-
latitude : 24.97016916051507,24.97016916051507
Longitude : 88.2172878831625,88.2172878831625
file name : Image_19032021160237657.png
|
2021-03-19 16:02:37.832253 |
8 |
58868227 |
STREET LIGHT CONNECTION FROM BIKASH SUTRADHAR TOWARDS RAJKUMAR RAM AT D CHARLAXMIPUR |
363000 |
STREET LIGHT CONNECTION FROM BIKASH SUTRADHAR TOWARDS RAJKUMAR RAM AT D CHARLAXMIPUR1 |
Roof laid |
-
latitude : 24.96974785
Longitude : 88.24009182
file name : Image_11052023152120377.png
|
2023-05-11 15:21:20.493406 |
9 |
35544319 |
Construction of cc road from Biswanath towards Milan das Kartik Choudhury At Adampur CFC BG |
130000 |
Construction of cc road from Biswanath towards Milan das Kartik Choudhury At Adampur CFC BG1 |
Roof laid |
-
latitude : 24.95910291094333,24.95910291094333
Longitude : 88.18907992914319,88.18907992914319
file name : Image_18032021165639289.png
|
2021-03-18 16:56:39.357972 |
10 |
35568135 |
Construction of cc road from Nimai das House toward Nilay RAI House at Mahadebpur paschim CFC BG |
250000 |
Construction of cc road from Nimai das House toward Nilay RAI House at Mahadebpur paschim CFC BG1 |
Roof laid |
-
latitude : 24.9679591,24.9679549
Longitude : 88.2157557,88.215758
file name : Image_19032021134327340.png
|
2021-03-19 13:43:27.369646 |
11 |
35526636 |
Construction of cc road from Ho Lachman Choudhury towards H o Rmjit Choudhury at AdampurCFCBG |
70000 |
Construction of cc road from Ho Lachman Choudhury towards H o Rmjit Choudhury at AdampurCFCBG1 |
Roof laid |
-
latitude : 24.960632482543588,24.960632482543588
Longitude : 88.18757889792323,88.18757889792323
file name : Image_18032021165643087.png
|
2021-03-18 16:56:43.14747 |
12 |
67133870 |
Construction of Community Sanitary Complex |
80000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.96287357,24.96287357
Longitude : 88.22092245,88.22092245
file name : Image_19052023150436130.png
|
2023-05-19 15:04:36.226388 |
13 |
66273059 |
Construction of CC Road from HO Baidyanath Biswas towards Shreedam Haldar at Dakshin Charlaxmipur |
200000 |
Construction of CC Road from HO Baidyanath Biswas towards Shreedam Haldar at Dakshin Charlaxmipur 1 |
Roof laid |
-
latitude : 24.96785787,24.96786099
Longitude : 88.23921173,88.23922169
file name : Image_19012023153030396.png
|
2023-01-19 15:30:30.52315 |
14 |
47091953 |
CONSTRUCTION OF DRAIN WITH COVER FROM MANAHARPUR PRY SCHOOL TOWARDS H O DEJI BIBI AT MUCHIA GOLAPAT |
213086 |
CONSTRUCTION OF DRAIN WITH COVER FROM MANAHARPUR PRY SCHOOL TOWARDS H O DEJI BIBI AT MUCHIA GOLAPAT1 |
Roof laid |
-
latitude : 24.9634902,24.9634905
Longitude : 88.2236908,88.2236915
file name : Image_19012023142459610.png
|
2023-01-19 14:24:59.702042 |
15 |
67132961 |
Construction of Community Sanitary Complex |
92000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.96022855,24.96022855,24.96022855
Longitude : 88.23001718,88.23001718,88.23001718
file name : Image_19052023150614580.png
|
2023-05-19 15:06:14.69311 |
16 |
67132503 |
Construction of CC Road house of Gobinda Basak house Towards Ujjwal Sarkar at Charlaxmipur |
95000 |
Construction of CC Road house of Gobinda Basak house Towards Ujjwal Sarkar at Charlaxmipur1 |
Roof laid |
-
latitude : 24.96958759,24.96958761
Longitude : 88.24019314,88.24019309
file name : Image_24042023152600960.png
|
2023-04-24 15:26:01.062204 |
17 |
66272474 |
Installation of High mast light post at Tarakali Mandir at Muchia Gram Panchayat untied |
100000 |
Installation of High mast light post at Tarakali Mandir at Muchia Gram Panchayat untied1 |
Roof laid |
-
latitude : 24.97040265
Longitude : 88.23175778
file name : Image_31122022144430478.png
|
2022-12-31 14:44:30.578865 |
18 |
47029457 |
INSTALLATION OF SUBMERSIBLE PUMP WITH FILTER NEAR HO MANIK SARKAR AT LAXMIPUR TIED |
463086 |
INSTALLATION OF SUBMERSIBLE PUMP WITH FILTER NEAR HO MANIK SARKAR AT LAXMIPUR TIED 1 |
Roof laid |
-
latitude : 24.96613338
Longitude : 88.23897253
file name : Image_31122022150546782.png
|
2022-12-31 15:05:46.881077 |
19 |
47030026 |
INSTALLATION OF HIGH MAST LIGHT POST NEAR KALPATARU CLUB AT SENDIYA UNITED |
100000 |
INSTALLATION OF HIGH MAST LIGHT POST NEAR KALPATARU CLUB AT SENDIYA UNITED 1 |
Roof laid |
-
latitude : 24.97414949
Longitude : 88.23787291
file name : Image_31122022145401788.png
|
2022-12-31 14:54:02.025787 |
20 |
66274011 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.98310078
Longitude : 88.23603311
file name : Image_19012023150527639.png
|
2023-01-19 15:05:27.729135 |
21 |
46919419 |
INSTALLATION OF SUB MERSIBLE PUMP WITH FILTER NEAR HO NIRMAL BISWAS SHIBMANDIR AT NEMUA TIED |
463086 |
INSTALLATION OF SUB MERSIBLE PUMP WITH FILTER NEAR HO NIRMAL BISWAS SHIBMANDIR AT NEMUA TIED 1 |
Roof laid |
-
latitude : 24.96402701
Longitude : 88.20836887
file name : Image_30012023153523301.png
|
2023-01-30 15:35:23.422889 |
22 |
66274040 |
Construction of Community Sanitary Complex |
300000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.96970635
Longitude : 88.24005567
file name : Image_03022023122051492.png
|
2023-02-03 12:20:51.602664 |
23 |
66272946 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.9600806,24.9600806
Longitude : 88.23018548,88.23018548
file name : Image_19052023150709382.png
|
2023-05-19 15:07:09.470626 |
24 |
67132716 |
Construction of CC Road from Rajib Rai towards Ranjit Sarkar at Charlaxmipur |
72000 |
Construction of CC Road from Rajib Rai towards Ranjit Sarkar at Charlaxmipur1 |
Roof laid |
-
latitude : 24.97071296,24.97071197
Longitude : 88.23971196,88.23971154
file name : Image_24042023152320852.png
|
2023-04-24 15:23:20.956643 |
25 |
67132716 |
Construction of CC Road from Rajib Rai towards Ranjit Sarkar at Charlaxmipur |
72000 |
Construction of CC Road from Rajib Rai towards Ranjit Sarkar at Charlaxmipur1 |
Roof laid |
-
latitude : 24.97070545,24.97070549
Longitude : 88.23970312,88.23970312
file name : Image_24042023152325056.png
|
2023-04-24 15:23:25.157731 |
26 |
35660885 |
Installation of High mast light post infront Laluchandra Das House at Mahadebpur purba CFC BG |
100000 |
Installation of High mast light post infront Laluchandra Das House at Mahadebpur purba CFC BG1 |
Roof laid |
-
latitude : 24.967313278466463
Longitude : 88.2163829728961
file name : Image_07082022102025735.png
|
2022-08-07 10:20:25.88745 |
27 |
39054735 |
INSTALLATION OF SUBMERSIBLEPUMP AT RAMPARA BOTGACH TOLA CFC BG TIED |
300000 |
INSTALLATION OF SUBMERSIBLEPUMP AT RAMPARA BOTGACH TOLA CFC BG TIED1 |
Roof laid |
-
latitude : 24.964462090283632
Longitude : 88.21044280193746
file name : Image_13062022160548366.png
|
2022-06-13 16:05:48.472518 |
28 |
35548752 |
Construction of cc Road from Kayesh Dewan House towards Bablu Dewan House at Chhotpur CFC BG UNTIED |
125000 |
Construction of cc Road from Kayesh Dewan House towards Bablu Dewan House at Chhotpur CFC BG UNTIED1 |
Roof laid |
-
latitude : 24.9671604,24.9671596
Longitude : 88.1788651,88.178864
file name : Image_13062022160541682.png
|
2022-06-13 16:05:41.767 |
29 |
35566207 |
Comstruction of cc road from Sonamuni House towards Sankar Gupta House at Golapatty CFC BG UNTIED |
375000 |
Comstruction of cc road from Sonamuni House towards Sankar Gupta House at Golapatty CFC BG UNTIED1 |
Roof laid |
-
latitude : 24.961324869655073,24.9613217683509
Longitude : 88.2266591861844,88.22665642015636
file name : Image_13062022165002974.png
|
2022-06-13 16:50:03.092487 |
30 |
35556343 |
Construction of cc road with earth work from Sukumar Pal towards Main road at Baruipara UNTIED |
150000 |
Construction of cc road with earth work from Sukumar Pal towards Main road at Baruipara UNTIED1 |
Roof laid |
-
latitude : 24.9609533,24.9609405
Longitude : 88.2363413,88.2363299
file name : Image_02082022140307567.png
|
2022-08-02 14:03:07.65728 |
31 |
35565794 |
Construction of cc road from Milan Biswas House towards PWD Road at Manaharpur CFC BG |
100000 |
Construction of cc road from Milan Biswas House towards PWD Road at Manaharpur CFC BG1 |
Roof laid |
-
latitude : 24.96661653276533,24.9661033
Longitude : 88.22094767354429,88.2218496
file name : Image_02082022133752735.png
|
2022-08-02 13:37:52.919933 |
32 |
35561766 |
Construction of cc road from Ajit House towards Mobarakpur Pry School At Mahadebpiur purba UNTIED |
200000 |
Construction of cc road from Ajit House towards Mobarakpur Pry School At Mahadebpiur purba UNTIED1 |
Roof laid |
-
latitude : 24.969499027356505,24.969462398439646
Longitude : 88.21307019330561,88.21302191354334
file name : Image_07082022102029543.png
|
2022-08-07 10:20:29.634412 |
33 |
35546960 |
Installatrion of a Submersible pump infront of Prabhat Das House at Adampur CFC BG TIED |
300000 |
Installatrion of a Submersible pump infront of Prabhat Das House at Adampur CFC BG TIED1 |
Roof laid |
-
latitude : 24.957059109583497
Longitude : 88.19337205030024
file name : Image_24062022172520317.png
|
2022-06-24 17:25:20.430652 |
34 |
35665108 |
Installation of High mast Light infront of Gobinda saha at Anandanagar CFC BG |
100000 |
Installation of High mast Light infront of Gobinda saha at Anandanagar CFC BG1 |
Roof laid |
-
latitude : 24.968732041306794
Longitude : 88.21125911548734
file name : Image_07082022102043857.png
|
2022-08-07 10:20:43.960607 |
35 |
35527425 |
construction of cc road from Ho Raghunath Choudhury towards Ho Niten at Adampur CFCBG |
70000 |
construction of cc road from Ho Raghunath Choudhury towards Ho Niten at Adampur CFCBG1 |
Roof laid |
-
latitude : 24.96004675514996,24.960083509795368
Longitude : 88.18651992827654,88.18678387440741
file name : Image_13062022160545008.png
|
2022-06-13 16:05:45.088179 |
36 |
35695674 |
Construction of siri from main road towards village at laxmipur CFC BG |
50000 |
Construction of siri from main road towards village at laxmipur CFC BG1 |
Roof laid |
-
latitude : 24.96180968,24.96180925
Longitude : 88.23797178,88.23797183
file name : Image_29112022163033910.png
|
2022-11-29 16:30:34.004484 |
37 |
35678529 |
Rennovation of Muchia Gp office At Muchia Gp office CFC BG |
250000 |
Rennovation of Muchia Gp office At Muchia Gp office CFC BG1 |
Roof laid |
-
latitude : 24.9653192
Longitude : 88.22241715
file name : Image_30112022160749269.png
|
2022-11-30 16:07:49.358241 |
38 |
35667630 |
Installation of submersible pump infront Bimal Mandal House At mahadebpur paschim CFC BG TIED |
300000 |
Installation of submersible pump infront Bimal Mandal House At mahadebpur paschim CFC BG TIED1 |
Roof laid |
-
latitude : 24.965738779865205
Longitude : 88.21343019604683
file name : Image_07072021221007737.png
|
2021-07-07 22:10:07.851387 |
39 |
39054781 |
Installation of Submersible pump near Durjay Sangha Club Laxmipur CFCBG TIED |
300000 |
Installation of Submersible pump near Durjay Sangha Club Laxmipur CFCBG TIED 1 |
Roof laid |
-
latitude : 24.96668350417167
Longitude : 88.23967594653368
file name : Image_07072021221106435.png
|
2021-07-07 22:11:06.547652 |
40 |
39054672 |
Installation of submersible pump near Goinda das house CFC BG TIED |
300000 |
Installation of submersible pump near Goinda das house CFC BG TIED1 |
Roof laid |
-
latitude : 24.969099294394255
Longitude : 88.21606856770813
file name : Image_07072021221013179.png
|
2021-07-07 22:10:13.310656 |
41 |
35670011 |
Installation of submersible pump infront of kanchiram House at Dakshin Char Laxmipur CFC BG TIED |
300000 |
Installation of submersible pump infront of kanchiram House at Dakshin Char Laxmipur CFC BG TIED1 |
Roof laid |
-
latitude : 24.967559287324548
Longitude : 88.23850340209901
file name : Image_07072021221112311.png
|
2021-07-07 22:11:12.431652 |
42 |
35674188 |
Installation of Filter at the mershal of nakul Mandal House at Najarpur CFC BG TIED |
50000 |
Installation of Filter at the mershal of nakul Mandal House at Najarpur CFC BG TIED1 |
Roof laid |
-
latitude : 24.968475848436356
Longitude : 88.22578880935907
file name : Image_07072021221022973.png
|
2021-07-07 22:10:23.084977 |
43 |
35673861 |
Installation of filter at the mershal of Bipul mandal house at Najarpur CFC BG TIED |
50000 |
Installation of filter at the mershal of Bipul mandal house at Najarpur CFC BG TIED1 |
Roof laid |
-
latitude : 24.969716244377196
Longitude : 88.22681869380176
file name : Image_07072021221101605.png
|
2021-07-07 22:11:01.729423 |
44 |
39054647 |
INSTALLATION OF SUBMERSIBLE PUMP NEAR ADHIBASIPARA KHASPARA TIED |
300000 |
INSTALLATION OF SUBMERSIBLE PUMP NEAR ADHIBASIPARA KHASPARA TIED1 |
Roof laid |
-
latitude : 24.965693978592753
Longitude : 88.20387088693678
file name : Image_09092021171752567.png
|
2021-09-09 17:17:52.64634 |
45 |
35557055 |
Installation of submrsible pump with soak pit near Muchia baruipara Choudhury Graden CFC BG TIED |
300000 |
Installation of submrsible pump with soak pit near Muchia baruipara Choudhury Graden CFC BG TIED1 |
Roof laid |
-
latitude : 24.96098829433322
Longitude : 88.23426090180874
file name : Image_09092021171749549.png
|
2021-09-09 17:17:49.623363 |
46 |
35545518 |
Installation of submersible pump near Manahar Choudhury House at Adampur CFC BG TIED |
300000 |
Installation of submersible pump near Manahar Choudhury House at Adampur CFC BG TIED1 |
Plinth level |
-
latitude : 24.96059430297464
Longitude : 88.18756766617298
file name : Image_09092021171755723.png
|
2021-09-09 17:17:55.804098 |
47 |
35553943 |
Construction of cc road from Sajit Ghosh House towards Satyen Sarkar House at Nemua CFC BG UNTIED |
200000 |
Construction of cc road from Sajit Ghosh House towards Satyen Sarkar House at Nemua CFC BG UNTIED1 |
Roof laid |
-
latitude : 24.966389634646475,24.966388000175357,24.966388000175357
Longitude : 88.2012798730284,88.20128339342773,88.20128339342773
file name : Image_16032021142626953.png
|
2021-03-16 14:26:27.04131 |
48 |
35666152 |
Installation of high mast light at Ajaynagar bat tola CFC BG |
100000 |
Installation of high mast light at Ajaynagar bat tola CFC BG1 |
Roof laid |
-
latitude : 24.964508903212845
Longitude : 88.2104698754847
file name : Image_17032021130507180.png
|
2021-03-17 13:05:07.257568 |
49 |
35665914 |
Installation of high mast light post atr mathpara ananda nagar infront of Gopal Mandal House CFC BG |
100000 |
Installation of high mast light post atr mathpara ananda nagar infront of Gopal Mandal House CFC BG1 |
Roof laid |
-
latitude : 24.9684279
Longitude : 88.215579
file name : Image_17032021130503921.png
|
2021-03-17 13:05:04.003474 |
50 |
35570562 |
Installation of High mast light post infront of Kalitala Durga Mandir at Mahadebpur Purba UNTIED |
100000 |
Installation of High mast light post infront of Kalitala Durga Mandir at Mahadebpur Purba UNTIED1 |
Roof laid |
-
latitude : 24.989040680229664
Longitude : 88.14615335315466
file name : Image_17032021130500815.png
|
2021-03-17 13:05:00.916322 |
51 |
35670460 |
Construction of cc road from Ananda Singha House towards Nimai Podder House at laxmipur UNTIED |
250000 |
Construction of cc road from Ananda Singha House towards Nimai Podder House at laxmipur UNTIED1 |
Roof laid |
-
latitude : 24.963067886419594,24.963067886419594
Longitude : 88.23673272505403,88.23673272505403
file name : Image_17032021135104597.png
|
2021-03-17 13:51:04.70308 |
52 |
58839423 |
SUB MARSHALL PUMP INFRONT OF AKANTA DUTTA HOUSE |
272000 |
SUB MARSHALL PUMP INFRONT OF AKANTA DUTTA HOUSE1 |
Roof laid |
-
latitude : 24.97303198
Longitude : 88.23801175
file name : Image_11062023142649997.png
|
2023-06-11 14:26:50.107475 |
53 |
67135882 |
Construction of Community Sanitary Complex |
300000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.97409408
Longitude : 88.23726004
file name : Image_03062024133048544.png
|
2024-06-03 13:30:48.649743 |
54 |
67135882 |
Construction of Community Sanitary Complex |
300000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.97407781
Longitude : 88.23722426
file name : Image_30052024140133631.png
|
2024-05-30 14:01:33.731765 |
55 |
67135882 |
Construction of Community Sanitary Complex |
300000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.97406236
Longitude : 88.23723452
file name : Image_11062023142921459.png
|
2023-06-11 14:29:21.590229 |
56 |
35569454 |
Installation of high mast solar lighit at Shibganj in front of Kali mandir CFC BG |
100000 |
Installation of high mast solar lighit at Shibganj in front of Kali mandir CFC BG1 |
Roof laid |
-
latitude : 24.97968400362879
Longitude : 88.23424346745014
file name : Image_07082022102250319.png
|
2022-08-07 10:22:50.410099 |
57 |
77133539 |
CONSTRUCTION OF ROAD WITH BRICK BATS FROM NARAYAN PAL LAND TO JITEN MAHALDER LAND BIDHANGAR |
240000 |
CONSTRUCTION OF ROAD WITH BRICK BATS FROM NARAYAN PAL LAND TO JITEN MAHALDER LAND BIDHANGAR1 |
Completion of work |
-
latitude : 25.00454822,25.00428227
Longitude : 88.2128071,88.21283717
file name : Image_31072023172025085.png
|
2023-07-31 17:20:25.211396 |
58 |
58876450 |
LAMP POST INFRONT OF JAYANTA SARKAR HOUSE AT BIDHAN GAR |
100000 |
LAMP POST INFRONT OF JAYANTA SARKAR HOUSE AT BIDHAN GAR1 |
Completion of work |
-
latitude : 24.98053289
Longitude : 88.23456114
file name : Image_01082023155503823.png
|
2023-08-01 15:55:03.957912 |
59 |
58876450 |
LAMP POST INFRONT OF JAYANTA SARKAR HOUSE AT BIDHAN GAR |
100000 |
LAMP POST INFRONT OF JAYANTA SARKAR HOUSE AT BIDHAN GAR1 |
Completion of work |
-
latitude : 24.9805497
Longitude : 88.23444273
file name : Image_01082023155956405.png
|
2023-08-01 15:59:56.510668 |
60 |
58876450 |
LAMP POST INFRONT OF JAYANTA SARKAR HOUSE AT BIDHAN GAR |
100000 |
LAMP POST INFRONT OF JAYANTA SARKAR HOUSE AT BIDHAN GAR1 |
Completion of work |
-
latitude : 24.98054262
Longitude : 88.23448122
file name : Image_01082023155719994.png
|
2023-08-01 15:57:20.201549 |
61 |
58876450 |
LAMP POST INFRONT OF JAYANTA SARKAR HOUSE AT BIDHAN GAR |
100000 |
LAMP POST INFRONT OF JAYANTA SARKAR HOUSE AT BIDHAN GAR1 |
Completion of work |
-
latitude : 24.98054317
Longitude : 88.23448443
file name : Image_01082023155724424.png
|
2023-08-01 15:57:24.540594 |
62 |
77131263 |
INSTALLATION OF HIGH MASS LIGHT POST NEAR HO MANASHATALA AT MANAHARPUR |
100000 |
INSTALLATION OF HIGH MASS LIGHT POST NEAR HO MANASHATALA AT MANAHARPUR1 |
Completion of work |
-
latitude : 24.96665002
Longitude : 88.2201406
file name : Image_01082023165223670.png
|
2023-08-01 16:52:23.761189 |
63 |
77143431 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.96409557
Longitude : 88.18012526
file name : Image_08082023151350361.png
|
2023-08-08 15:13:50.571849 |
64 |
77143431 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.96414773
Longitude : 88.18013592
file name : Image_08082023151014312.png
|
2023-08-08 15:10:14.65723 |
65 |
77143431 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.96737836
Longitude : 88.1793462
file name : Image_08082023145120520.png
|
2023-08-08 14:51:20.622541 |
66 |
77143431 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.96416494
Longitude : 88.18011527
file name : Image_05082023164844156.png
|
2023-08-05 16:48:45.958497 |
67 |
67134209 |
Construction of Community Sanitary Complex |
95000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.96338127,24.96338127
Longitude : 88.22211614,88.22211614
file name : Image_08082023163041120.png
|
2023-08-08 16:30:41.216079 |
68 |
67134209 |
Construction of Community Sanitary Complex |
95000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.96336243,24.96337018,24.96337018
Longitude : 88.22215481,88.22215192,88.22215192
file name : Image_08082023162950800.png
|
2023-08-08 16:29:50.903999 |
69 |
67134209 |
Construction of Community Sanitary Complex |
95000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.96336921,24.96336921,24.96336921
Longitude : 88.22211524,88.22211524,88.22211524
file name : Image_08082023162524798.png
|
2023-08-08 16:25:24.898624 |
70 |
67134209 |
Construction of Community Sanitary Complex |
95000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.96340146,24.96340146
Longitude : 88.22214325,88.22214325
file name : Image_04082023154435741.png
|
2023-08-04 15:44:35.843345 |
71 |
77144541 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.96737499
Longitude : 88.1793495
file name : Image_08082023150337202.png
|
2023-08-08 15:03:37.256223 |
72 |
77144541 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.96738436
Longitude : 88.17934788
file name : Image_08082023145129740.png
|
2023-08-08 14:51:29.849999 |
73 |
77144541 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.96738436
Longitude : 88.17934788
file name : Image_08082023145151530.png
|
2023-08-08 14:51:51.632345 |
74 |
77144541 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.96737136
Longitude : 88.17935441
file name : Image_05082023163709326.png
|
2023-08-05 16:37:09.434284 |
75 |
77145905 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.98250746
Longitude : 88.22261324
file name : Image_08082023170642861.png
|
2023-08-08 17:06:42.96205 |
76 |
77145905 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.98251024
Longitude : 88.22262459
file name : Image_08082023170133518.png
|
2023-08-08 17:01:33.613419 |
77 |
77145905 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.98253492
Longitude : 88.22258895
file name : Image_05082023173408804.png
|
2023-08-05 17:34:08.919746 |
78 |
87269860 |
construction of cc road from house of Kalam Biswas at Chhotpur |
150000 |
construction of cc road from house of Kalam Biswas at Chhotpur1 |
Roof laid |
-
latitude : 24.9667458,24.9667458
Longitude : 88.1793929,88.1793929
file name : Image_26092023141554723.png
|
2023-09-26 14:15:54.819044 |
79 |
87269860 |
construction of cc road from house of Kalam Biswas at Chhotpur |
150000 |
construction of cc road from house of Kalam Biswas at Chhotpur1 |
Plinth level |
-
latitude : 24.9667489,24.9667489
Longitude : 88.1793903,88.1793903
file name : Image_26092023141109877.png
|
2023-09-26 14:11:09.974617 |
80 |
87269860 |
construction of cc road from house of Kalam Biswas at Chhotpur |
150000 |
construction of cc road from house of Kalam Biswas at Chhotpur1 |
Completion of work |
-
latitude : 24.9669896,24.96699325,24.96699325
Longitude : 88.17932012,88.17931042,88.17931042
file name : Image_26092023140332478.png
|
2023-09-26 14:03:32.560177 |
81 |
66273987 |
Construction of Community Sanitary Complex |
300000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.96795527
Longitude : 88.23942343
file name : Image_19012023153951414.png
|
2023-01-19 15:39:51.521222 |
82 |
67132828 |
Construction of Protection wall near house of Kanan Bala Das at Dakshin Charlaxmipur |
96000 |
Construction of Protection wall near house of Kanan Bala Das at Dakshin Charlaxmipur1 |
Roof laid |
-
latitude : 24.96790407,24.96790407
Longitude : 88.23942324,88.23942324
file name : Image_17102023152543984.png
|
2023-10-17 15:25:44.069676 |
83 |
67132828 |
Construction of Protection wall near house of Kanan Bala Das at Dakshin Charlaxmipur |
96000 |
Construction of Protection wall near house of Kanan Bala Das at Dakshin Charlaxmipur1 |
Plinth level |
-
latitude : 24.96793438,24.9679344
Longitude : 88.23938783,88.23938786
file name : Image_17102023150436667.png
|
2023-10-17 15:04:36.833539 |
84 |
67134115 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.97710392,24.97710384
Longitude : 88.2405583,88.2405582
file name : Image_10112023152429108.png
|
2023-11-10 15:24:29.204621 |
85 |
67134115 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.97718054,24.97711926
Longitude : 88.24058952,88.24055205
file name : Image_10112023151631232.png
|
2023-11-10 15:16:31.342691 |
86 |
67134115 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.9771062,24.97710528
Longitude : 88.24053363,88.24053239
file name : Image_10112023151803460.png
|
2023-11-10 15:18:03.570274 |
87 |
67134115 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.97713632,24.9771137
Longitude : 88.24059141,88.24059052
file name : Image_10112023145630153.png
|
2023-11-10 14:56:30.602168 |
88 |
67439200 |
Drinking water facilities |
150000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.9612225
Longitude : 88.23380132
file name : Image_17012024104247790.png
|
2024-01-17 10:42:47.869283 |
89 |
67439200 |
Drinking water facilities |
150000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.96119369
Longitude : 88.23385273
file name : Image_14012024144510276.png
|
2024-01-14 14:45:10.372879 |
90 |
67439200 |
Drinking water facilities |
150000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 24.96082692
Longitude : 88.2338969
file name : Image_13012024121649347.png
|
2024-01-13 12:16:49.443303 |
91 |
67266641 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.96733788,24.96733788
Longitude : 88.21721538,88.21721538
file name : Image_17012024103040701.png
|
2024-01-17 10:30:40.781263 |
92 |
67266641 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.96736057,24.96736021
Longitude : 88.21723447,88.21723692
file name : Image_14012024150613392.png
|
2024-01-14 15:06:13.474636 |
93 |
67266641 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.96731377,24.96731828
Longitude : 88.21727991,88.2172787
file name : Image_12012024125623974.png
|
2024-01-12 12:56:24.065886 |
94 |
77142292 |
Construction of Community Sanitary Complex |
300000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.96181824
Longitude : 88.22592066
file name : Image_01022024153017752.png
|
2024-02-01 15:30:17.846604 |
95 |
77142292 |
Construction of Community Sanitary Complex |
300000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.9617869
Longitude : 88.22593317
file name : Image_24012024134633756.png
|
2024-01-24 13:46:33.845355 |
96 |
77142292 |
Construction of Community Sanitary Complex |
300000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.96181932
Longitude : 88.22594066
file name : Image_24012024134007928.png
|
2024-01-24 13:40:08.018697 |
97 |
67341290 |
Electricity connection /Installation of Solar Energy |
100000 |
Electricity connection /Installation of Solar Energy1 |
Plinth level |
-
latitude : 24.96562691
Longitude : 88.22001743
file name : Image_08012024144307613.png
|
2024-01-08 14:43:07.754075 |
98 |
67341290 |
Electricity connection /Installation of Solar Energy |
100000 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 24.96565479
Longitude : 88.2200002
file name : Image_06012024144502383.png
|
2024-01-06 14:45:02.491247 |
99 |
67341290 |
Electricity connection /Installation of Solar Energy |
100000 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 24.96632996
Longitude : 88.21866215
file name : Image_06012024143747699.png
|
2024-01-06 14:37:47.87751 |
100 |
67341048 |
Electricity connection /Installation of Solar Energy |
100000 |
Electricity connection /Installation of Solar Energy1 |
Roof laid |
-
latitude : 24.97001067
Longitude : 88.21698985
file name : Image_17012024103506177.png
|
2024-01-17 10:35:06.318929 |
101 |
67341048 |
Electricity connection /Installation of Solar Energy |
100000 |
Electricity connection /Installation of Solar Energy1 |
Plinth level |
-
latitude : 24.96998528
Longitude : 88.21702861
file name : Image_14012024151323829.png
|
2024-01-14 15:13:23.938342 |
102 |
67341048 |
Electricity connection /Installation of Solar Energy |
100000 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 24.96998628
Longitude : 88.2170372
file name : Image_12012024125725136.png
|
2024-01-12 12:57:25.247784 |
103 |
67341174 |
Electricity connection /Installation of Solar Energy |
100000 |
Electricity connection /Installation of Solar Energy1 |
Plinth level |
-
latitude : 24.96769592
Longitude : 88.21949144
file name : Image_06012024143004642.png
|
2024-01-06 14:30:04.878615 |
104 |
67341174 |
Electricity connection /Installation of Solar Energy |
100000 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 24.96767226
Longitude : 88.21945005
file name : Image_06012024140752214.png
|
2024-01-06 14:07:52.349244 |
105 |
58909433 |
GP OFFICE BUILDING CONSTRUCTION |
350000 |
GP OFFICE BUILDING CONSTRUCTION1 |
Roof laid |
-
latitude : 24.9653555
Longitude : 88.2224037
file name : Image_01022024154551012.png
|
2024-02-01 15:45:51.109949 |
106 |
58909433 |
GP OFFICE BUILDING CONSTRUCTION |
350000 |
GP OFFICE BUILDING CONSTRUCTION1 |
Plinth level |
-
latitude : 24.96538021
Longitude : 88.22239017
file name : Image_24012024123136251.png
|
2024-01-24 12:31:36.325009 |
107 |
58909433 |
GP OFFICE BUILDING CONSTRUCTION |
350000 |
GP OFFICE BUILDING CONSTRUCTION1 |
Completion of work |
-
latitude : 24.9653496
Longitude : 88.2224026
file name : Image_24012024122033641.png
|
2024-01-24 12:20:33.731289 |
108 |
66272904 |
Construction of CC Road from HO Sanjay Debnath towards Durga Mandir at Manahapur under Muchia GP |
150000 |
Construction of CC Road from HO Sanjay Debnath towards Durga Mandir at Manahapur under Muchia GP1 |
Roof laid |
-
latitude : 24.96541513,24.96331197
Longitude : 88.22239262,88.22180443
file name : Image_30122022151308530.png
|
2022-12-30 15:13:08.649954 |
109 |
46944571 |
CONSTRUCTION OF CC ROAD FROM HO ARUN SARKAR TOWARDS HO MOHAN MRIDHA AT GOLAPATTY UNTIED |
200000 |
CONSTRUCTION OF CC ROAD FROM HO ARUN SARKAR TOWARDS HO MOHAN MRIDHA AT GOLAPATTY UNTIED 1 |
Roof laid |
-
latitude : 24.96368999,24.96367726
Longitude : 88.22690824,88.22691576
file name : Image_29112022163818604.png
|
2022-11-29 16:38:18.724303 |
110 |
46920741 |
CONSTRUCTION OF CC ROAD HO BRAJEN MISRA TOWARDS HO DURGA MANDAL AT MANAHARPUR UNTIED |
150000 |
CONSTRUCTION OF CC ROAD HO BRAJEN MISRA TOWARDS HO DURGA MANDAL AT MANAHARPUR UNTIED 1 |
Roof laid |
-
latitude : 24.96316375,24.9631599
Longitude : 88.22149345,88.22148512
file name : Image_05122022153311049.png
|
2022-12-05 15:33:11.170782 |
111 |
66272565 |
Construction of CC Road from PWD road towards Nilratan Poddar house under Muchia GP UNTIED |
125000 |
Construction of CC Road from PWD road towards Nilratan Poddar house under Muchia GP UNTIED1 |
Roof laid |
-
latitude : 24.96257768,24.96255788
Longitude : 88.23701783,88.23704445
file name : Image_21122022144139074.png
|
2022-12-21 14:41:39.179382 |
112 |
46921053 |
CONSTRUCTION OF CC ROAD FROM HO PADMA MOHON CHOUDHURY TOWARDS HO MANIK CHOUDHURY AT MAHAJUMPARA UN |
100000 |
CONSTRUCTION OF CC ROAD FROM HO PADMA MOHON CHOUDHURY TOWARDS HO MANIK CHOUDHURY AT MAHAJUMPARA UN1 |
Roof laid |
-
latitude : 24.96612242,24.96612279
Longitude : 88.21899101,88.21899053
file name : Image_21122022142143163.png
|
2022-12-21 14:21:43.276824 |
113 |
67802540 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.9643127
Longitude : 88.2325649
file name : Image_24012024131046337.png
|
2024-01-24 13:10:46.439944 |
114 |
67802540 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.9642276
Longitude : 88.2326088
file name : Image_24012024130414738.png
|
2024-01-24 13:04:14.835642 |
115 |
67802540 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.9642789
Longitude : 88.2325852
file name : Image_24012024123947726.png
|
2024-01-24 12:39:47.817939 |
116 |
67800863 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.96441134
Longitude : 88.23228352
file name : Image_24012024130715099.png
|
2024-01-24 13:07:15.177306 |
117 |
67800863 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.96438811
Longitude : 88.23228525
file name : Image_24012024125116484.png
|
2024-01-24 12:51:16.569146 |
118 |
67800863 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.96440146
Longitude : 88.23221509
file name : Image_24012024124054388.png
|
2024-01-24 12:40:54.482929 |
119 |
67135286 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.96148584,24.96148584
Longitude : 88.22656542,88.22656542
file name : Image_01022024153428662.png
|
2024-02-01 15:34:28.770598 |
120 |
67135286 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.9614867,24.9614867
Longitude : 88.2266025,88.2266025
file name : Image_24012024133653177.png
|
2024-01-24 13:36:53.270135 |
121 |
67135286 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.96154489,24.96154489
Longitude : 88.22642505,88.22642505
file name : Image_24012024132415308.png
|
2024-01-24 13:24:15.396349 |
122 |
77145295 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.99695812
Longitude : 88.21190414
file name : Image_21112023123652239.png
|
2023-11-21 12:36:52.358161 |
123 |
77145295 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.99699102
Longitude : 88.21191043
file name : Image_21112023122856349.png
|
2023-11-21 12:28:56.513853 |
124 |
77145295 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.996993
Longitude : 88.2119421
file name : Image_21112023122231470.png
|
2023-11-21 12:22:31.602825 |
125 |
77145295 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.99695353
Longitude : 88.21187994
file name : Image_07082023115355254.png
|
2023-08-07 11:53:55.360749 |
126 |
87269884 |
Construction of culvert with hume pipe near house of Ujjal Sarkar Dakshin Charlaxmipur |
200000 |
Construction of culvert with hume pipe near house of Ujjal Sarkar Dakshin Charlaxmipur1 |
Roof laid |
-
latitude : 24.96966701,24.96966706
Longitude : 88.24015594,88.24015592
file name : Image_23112023142556412.png
|
2023-11-23 14:25:56.501952 |
127 |
87269884 |
Construction of culvert with hume pipe near house of Ujjal Sarkar Dakshin Charlaxmipur |
200000 |
Construction of culvert with hume pipe near house of Ujjal Sarkar Dakshin Charlaxmipur1 |
Plinth level |
-
latitude : 24.96970885,24.96970885
Longitude : 88.24011643,88.24011643
file name : Image_23112023142249303.png
|
2023-11-23 14:22:49.390101 |
128 |
87269884 |
Construction of culvert with hume pipe near house of Ujjal Sarkar Dakshin Charlaxmipur |
200000 |
Construction of culvert with hume pipe near house of Ujjal Sarkar Dakshin Charlaxmipur1 |
Completion of work |
-
latitude : 24.96969433,24.96969482
Longitude : 88.24014881,88.24014815
file name : Image_23112023141959654.png
|
2023-11-23 14:19:59.745985 |
129 |
77073693 |
Creation of community soak pits for group of Households |
190800 |
Creation of community soak pits for group of Households1 |
Roof laid |
-
latitude : 24.95960599
Longitude : 88.18794013
file name : Image_05022024122238383.png
|
2024-02-05 12:22:38.474686 |
130 |
77073693 |
Creation of community soak pits for group of Households |
190800 |
Creation of community soak pits for group of Households1 |
Plinth level |
-
latitude : 24.95956133
Longitude : 88.18796129
file name : Image_05022024121156150.png
|
2024-02-05 12:11:56.24509 |
131 |
77073693 |
Creation of community soak pits for group of Households |
190800 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 24.95951203
Longitude : 88.1880256
file name : Image_04022024104930917.png
|
2024-02-04 10:49:31.009188 |
132 |
58844060 |
SUB MARSHALL PUMP INFRONT OF KADAMTALA CLUB |
272000 |
SUB MARSHALL PUMP INFRONT OF KADAMTALA CLUB1 |
Roof laid |
-
latitude : 24.96450319
Longitude : 88.18343938
file name : Image_09122023152653910.png
|
2023-12-09 15:26:53.989436 |
133 |
58844060 |
SUB MARSHALL PUMP INFRONT OF KADAMTALA CLUB |
272000 |
SUB MARSHALL PUMP INFRONT OF KADAMTALA CLUB1 |
Plinth level |
-
latitude : 24.96449886
Longitude : 88.18344019
file name : Image_09122023152438970.png
|
2023-12-09 15:24:39.056461 |
134 |
58844060 |
SUB MARSHALL PUMP INFRONT OF KADAMTALA CLUB |
272000 |
SUB MARSHALL PUMP INFRONT OF KADAMTALA CLUB1 |
Completion of work |
-
latitude : 24.96449767
Longitude : 88.18344154
file name : Image_09122023152202284.png
|
2023-12-09 15:22:02.366642 |
135 |
67342473 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.9658217,24.9658217
Longitude : 88.2105092,88.2105092
file name : Image_05022024124016405.png
|
2024-02-05 12:40:16.506188 |
136 |
67342473 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.9658217,24.9658217,24.9658217
Longitude : 88.2105092,88.2105092,88.2105092
file name : Image_05022024123834057.png
|
2024-02-05 12:38:34.164849 |
137 |
67342473 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.9658217,24.9658217
Longitude : 88.2105092,88.2105092
file name : Image_05022024123547679.png
|
2024-02-05 12:35:47.780756 |
138 |
67342587 |
Electricity connection /Installation of Solar Energy |
100000 |
Electricity connection /Installation of Solar Energy1 |
Roof laid |
-
latitude : 24.96516052
Longitude : 88.23156067
file name : Image_05022024125621648.png
|
2024-02-05 12:56:21.738524 |
139 |
67342587 |
Electricity connection /Installation of Solar Energy |
100000 |
Electricity connection /Installation of Solar Energy1 |
Plinth level |
-
latitude : 24.96516361
Longitude : 88.2315843
file name : Image_05022024125405387.png
|
2024-02-05 12:54:05.490031 |
140 |
67342587 |
Electricity connection /Installation of Solar Energy |
100000 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 24.96516456
Longitude : 88.23156852
file name : Image_05022024125122517.png
|
2024-02-05 12:51:22.607415 |
141 |
67562489 |
Drinking water facilities |
200000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.96548662
Longitude : 88.22146483
file name : Image_08022024173551156.png
|
2024-02-08 17:35:51.257201 |
142 |
67562489 |
Drinking water facilities |
200000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.96548843
Longitude : 88.22146814
file name : Image_08022024173303386.png
|
2024-02-08 17:33:03.503909 |
143 |
67562489 |
Drinking water facilities |
200000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 24.96676973
Longitude : 88.22096605
file name : Image_08022024172532158.png
|
2024-02-08 17:25:32.253368 |
144 |
75959988 |
Creation of a new source of drinking water |
120000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.97795691
Longitude : 88.240209
file name : Image_22022024102934517.png
|
2024-02-22 10:29:34.631814 |
145 |
75959988 |
Creation of a new source of drinking water |
120000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.97792724
Longitude : 88.24019459
file name : Image_22022024102358467.png
|
2024-02-22 10:23:58.567904 |
146 |
75959988 |
Creation of a new source of drinking water |
120000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.97795326
Longitude : 88.24022968
file name : Image_22022024101159167.png
|
2024-02-22 10:11:59.251824 |
147 |
89563316 |
Construction of Community Sanitary Complex |
228000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 25.00210533
Longitude : 88.21251034
file name : Image_05032024165748871.png
|
2024-03-05 16:57:48.966165 |
148 |
89563316 |
Construction of Community Sanitary Complex |
228000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 25.00209932
Longitude : 88.21247247
file name : Image_05032024165110839.png
|
2024-03-05 16:51:10.933878 |
149 |
58827362 |
CC CULVERT FROM PWD ROAD TOWARDS FOOTBALL FIELD |
227000 |
CC CULVERT FROM PWD ROAD TOWARDS FOOTBALL FIELD1 |
Roof laid |
-
latitude : 24.96357358,24.96357359
Longitude : 88.23478064,88.23478063
file name : Image_09122023145112445.png
|
2023-12-09 14:51:12.560602 |
150 |
58827362 |
CC CULVERT FROM PWD ROAD TOWARDS FOOTBALL FIELD |
227000 |
CC CULVERT FROM PWD ROAD TOWARDS FOOTBALL FIELD1 |
Plinth level |
-
latitude : 24.9635715,24.96357149
Longitude : 88.23477455,88.23477456
file name : Image_09122023144832102.png
|
2023-12-09 14:48:32.217617 |
151 |
58827362 |
CC CULVERT FROM PWD ROAD TOWARDS FOOTBALL FIELD |
227000 |
CC CULVERT FROM PWD ROAD TOWARDS FOOTBALL FIELD1 |
Completion of work |
-
latitude : 24.96370869,24.96370869
Longitude : 88.23475535,88.23475535
file name : Image_09122023144537742.png
|
2023-12-09 14:45:37.913157 |
152 |
67438874 |
Drinking water facilities |
150000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.96150247
Longitude : 88.23793229
file name : Image_16022024121027475.png
|
2024-02-16 12:10:27.590292 |
153 |
67438874 |
Drinking water facilities |
150000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.96149617
Longitude : 88.23794734
file name : Image_16022024120504708.png
|
2024-02-16 12:05:04.80454 |
154 |
67438874 |
Drinking water facilities |
150000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 24.96140335
Longitude : 88.23791665
file name : Image_16022024115959323.png
|
2024-02-16 11:59:59.418445 |
155 |
67562157 |
Drinking water facilities |
150000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.95587031
Longitude : 88.19160289
file name : Image_23022024111115686.png
|
2024-02-23 11:11:15.827399 |
156 |
67562157 |
Drinking water facilities |
150000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.95588331
Longitude : 88.1915622
file name : Image_23022024110633965.png
|
2024-02-23 11:06:34.079211 |
157 |
67562157 |
Drinking water facilities |
150000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 24.95586699
Longitude : 88.19157623
file name : Image_23022024110009943.png
|
2024-02-23 11:00:10.059693 |
158 |
67798729 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.9760195
Longitude : 88.2321413
file name : Image_22022024105841364.png
|
2024-02-22 10:58:41.4576 |
159 |
67798729 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.97601138
Longitude : 88.2321235
file name : Image_22022024105620680.png
|
2024-02-22 10:56:20.786163 |
160 |
67798729 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.97601311
Longitude : 88.23212062
file name : Image_22022024105324756.png
|
2024-02-22 10:53:24.855771 |
161 |
67134179 |
Construction of Community Sanitary Complex |
96000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.96476305,24.96477653
Longitude : 88.2390094,88.23898746
file name : Image_05032024094920638.png
|
2024-03-05 09:49:20.720865 |
162 |
67134179 |
Construction of Community Sanitary Complex |
96000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.96498924,24.96498924
Longitude : 88.23898718,88.23898718
file name : Image_01032024172739796.png
|
2024-03-01 17:27:39.894555 |
163 |
67134179 |
Construction of Community Sanitary Complex |
96000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.96478513,24.96478513
Longitude : 88.2389083,88.2389083
file name : Image_27022024085038105.png
|
2024-02-27 08:50:38.198167 |
164 |
89563097 |
Construction of Community Sanitary Complex |
150000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.96554246
Longitude : 88.22073371
file name : Image_28022024111207270.png
|
2024-02-28 11:12:07.36707 |
165 |
89563097 |
Construction of Community Sanitary Complex |
150000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.96552199
Longitude : 88.22076506
file name : Image_27022024091309649.png
|
2024-02-27 09:13:07.270758 |
166 |
89563174 |
Construction of Community Sanitary Complex |
180000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.96745594
Longitude : 88.21940281
file name : Image_28022024111353306.png
|
2024-02-28 11:13:53.405872 |
167 |
89563174 |
Construction of Community Sanitary Complex |
180000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.96739169
Longitude : 88.21942558
file name : Image_27022024091536407.png
|
2024-02-27 09:15:36.391121 |
168 |
58860087 |
CC ROAD FROM BINAY SAHA HOUSE TOWARDS NARAYAN MANDAL HOUSE AT NEMUA |
263000 |
CC ROAD FROM BINAY SAHA HOUSE TOWARDS NARAYAN MANDAL HOUSE AT NEMUA1 |
Roof laid |
-
latitude : 24.96356572,24.96356733
Longitude : 88.19532561,88.19532516
file name : Image_29032023125019910.png
|
2023-03-29 12:50:20.01443 |
169 |
58871594 |
CC ROAD FROM NAJRUL SEKH TOWARDS EBRAHIM AT CHHOTPUR |
100000 |
CC ROAD FROM NAJRUL SEKH TOWARDS EBRAHIM AT CHHOTPUR1 |
Roof laid |
-
latitude : 24.96602001,24.96597916
Longitude : 88.17878593,88.17880311
file name : Image_29032023124028226.png
|
2023-03-29 12:40:28.916171 |
170 |
46944906 |
CONSTRUCTION OF CC ROAD HO PRABIR ROY CHOUDHURY TOWARDS HO DIPALI MOHAN SAHA AT D CHAR LAXMIPUR UN |
350000 |
CONSTRUCTION OF CC ROAD HO PRABIR ROY CHOUDHURY TOWARDS HO DIPALI MOHAN SAHA AT D CHAR LAXMIPUR UN1 |
Roof laid |
-
latitude : 24.96803114,24.96803114
Longitude : 88.24080897,88.24080897
file name : Image_24042023152931931.png
|
2023-04-24 15:29:32.053726 |
171 |
66272994 |
Construction of CC Road from HO Gobinda Sarkar towards Mantu Basu at Dakshin Charlaxmipur under Much |
250000 |
Construction of CC Road from HO Gobinda Sarkar towards Mantu Basu at Dakshin Charlaxmipur under Much1 |
Roof laid |
-
latitude : 24.96847803,24.96846295
Longitude : 88.23911416,88.23910427
file name : Image_24042023152313150.png
|
2023-04-24 15:23:13.259773 |
172 |
66272994 |
Construction of CC Road from HO Gobinda Sarkar towards Mantu Basu at Dakshin Charlaxmipur under Much |
250000 |
Construction of CC Road from HO Gobinda Sarkar towards Mantu Basu at Dakshin Charlaxmipur under Much1 |
Roof laid |
-
latitude : 24.96848498,24.96848755
Longitude : 88.23913367,88.23913335
file name : Image_24042023152316934.png
|
2023-04-24 15:23:17.076857 |
173 |
67132351 |
Construction of cc road from Satmile concrete road towards house of Goutam Biswas at Golapatti |
94000 |
Construction of cc road from Satmile concrete road towards house of Goutam Biswas at Golapatti 1 |
Roof laid |
-
latitude : 24.96418224,24.96418224
Longitude : 88.22776736,88.22776736
file name : Image_04052023163707762.png
|
2023-05-04 16:37:07.852842 |
174 |
67132410 |
CC Road from house of Uttam Biswas towards Sonatan Karmakar at Golapatti |
94000 |
CC Road from house of Uttam Biswas towards Sonatan Karmakar at Golapatti1 |
Roof laid |
-
latitude : 24.96423746,24.96423746
Longitude : 88.2277471,88.2277471
file name : Image_04052023163531747.png
|
2023-05-04 16:35:31.841405 |
175 |
67132875 |
Construction of CC Road from House of Parbat Mandal towards house of Baburam Mishra at Englishtola |
60000 |
Construction of CC Road from House of Parbat Mandal towards house of Baburam Mishra at Englishtola1 |
Roof laid |
-
latitude : 24.96398297,24.96398297
Longitude : 88.22780605,88.22780605
file name : Image_04052023164006387.png
|
2023-05-04 16:40:06.473271 |
176 |
58837936 |
SUB MARSHALL PUMP INFRONT OF BARUN BISWAS HOUSE |
272000 |
SUB MARSHALL PUMP INFRONT OF BARUN BISWAS HOUSE1 |
Roof laid |
-
latitude : 24.9634089
Longitude : 88.2404897
file name : Image_02052023163600626.png
|
2023-05-02 16:36:00.728556 |
177 |
67341288 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.96429448,24.96428795
Longitude : 88.23341722,88.2334184
file name : Image_05062024114101131.png
|
2024-06-05 11:41:01.282882 |
178 |
67341288 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.96428301,24.96428775
Longitude : 88.23341448,88.23341518
file name : Image_05062024113641213.png
|
2024-06-05 11:36:41.390971 |
179 |
67341288 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.964717,24.96424258
Longitude : 88.2334041,88.23344817
file name : Image_03062024125248754.png
|
2024-06-03 12:52:48.847019 |
180 |
58892057 |
SUB MARSHALL PUMP INFRONT OF NENGRI KALI MANDIR AT MAHAJUMPARA |
272000 |
SUB MARSHALL PUMP INFRONT OF NENGRI KALI MANDIR AT MAHAJUMPARA1 |
Roof laid |
-
latitude : 24.9654541
Longitude : 88.2197644
file name : Image_04052023114427714.png
|
2023-05-04 11:44:27.830512 |
181 |
67132677 |
Construction of CC Road from Mahajumpara Concrete Road towards Land of Narayan Das Mahajumpara |
96000 |
Construction of CC Road from Mahajumpara Concrete Road towards Land of Narayan Das Mahajumpara1 |
Roof laid |
-
latitude : 24.96433041,24.96433041
Longitude : 88.21855412,88.21855412
file name : Image_19052023145217213.png
|
2023-05-19 14:52:17.302184 |
182 |
67134023 |
Construction of Community Sanitary Complex |
96000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.96431553,24.96431553
Longitude : 88.23221854,88.23221854
file name : Image_26052023153406624.png
|
2023-05-26 15:34:06.726493 |
183 |
73652434 |
INSTALLATION OF HIGH MAST LIGHT POST NEAR HO SUDHIR PRAMANIK AT NEMUA UNTIED 1.00LAKH untied |
100000 |
INSTALLATION OF HIGH MAST LIGHT POST NEAR HO SUDHIR PRAMANIK AT NEMUA UNTIED 1.00LAKH untied1 |
Roof laid |
-
latitude : 24.96261638
Longitude : 88.20285182
file name : Image_26052023152034281.png
|
2023-05-26 15:20:34.407043 |
184 |
67133921 |
Construction of Community Sanitary Complex |
96000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.97717321,24.97717322
Longitude : 88.24041261,88.2404126
file name : Image_08082023172358026.png
|
2023-08-08 17:23:58.000076 |
185 |
67133921 |
Construction of Community Sanitary Complex |
96000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.9771611,24.9771611
Longitude : 88.24039111,88.24039111
file name : Image_04082023160159487.png
|
2023-08-04 16:01:59.594733 |
186 |
67133921 |
Construction of Community Sanitary Complex |
96000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.96433685,24.96433685
Longitude : 88.23228727,88.23228727
file name : Image_31052023140304374.png
|
2023-05-31 14:03:04.473746 |
187 |
67132553 |
Construction of CC Road house of Arfat Dewan towards house of Subash Dewan (Land of Subhash Dewan) a |
95000 |
Construction of CC Road house of Arfat Dewan towards house of Subash Dewan (Land of Subhash Dewan) a1 |
Roof laid |
-
latitude : 24.96758149,24.96758154
Longitude : 88.17928511,88.17928513
file name : Image_31052023142535290.png
|
2023-05-31 14:25:35.389004 |
188 |
46918106 |
CONSTRUCTION OF CC ROAD FROM HO FAJLU SEKH TOWARDS HO ENAUL SEKH AT CHHOTPUR UNTIED |
70000 |
CONSTRUCTION OF CC ROAD FROM HO FAJLU SEKH TOWARDS HO ENAUL SEKH AT CHHOTPUR UNTIED 1 |
Roof laid |
-
latitude : 24.9653902,24.9653902,24.9653902
Longitude : 88.1790855,88.1790855,88.1790855
file name : Image_31052023141859523.png
|
2023-05-31 14:18:59.623845 |
189 |
46917789 |
CONSTRUCTION OF CC ROAD FROM HO IBRAHIM DEWAN TOWARDS HO UJIR DEWAN AT CHHOTPUR UNTIED |
40000 |
CONSTRUCTION OF CC ROAD FROM HO IBRAHIM DEWAN TOWARDS HO UJIR DEWAN AT CHHOTPUR UNTIED 1 |
Roof laid |
-
latitude : 24.9673114,24.9673114
Longitude : 88.17905538,88.17905538
file name : Image_31052023142426624.png
|
2023-05-31 14:24:26.720218 |
190 |
67135761 |
Construction of Community Sanitary Complex |
80000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.9655251
Longitude : 88.2223033
file name : Image_30032023140631800.png
|
2023-03-30 14:06:31.886438 |
191 |
35666525 |
Installation of submersible pump infront of buddhimatt Biswas House At anandanagar CFC BG TIED |
305001 |
Installation of submersible pump infront of buddhimatt Biswas House At anandanagar CFC BG TIED1 |
Plinth level |
-
latitude : 24.96876758057624
Longitude : 88.21132197976112
file name : Image_13062022160551621.png
|
2022-06-13 16:05:51.720596 |
192 |
35679679 |
Installation of submersible pump with filter infront Ranjan Gain House at Sendiya CFC BG TIED |
305000 |
Installation of submersible pump with filter infront Ranjan Gain House at Sendiya CFC BG TIED1 |
Roof laid |
-
latitude : 24.978110804222524
Longitude : 88.23035191744566
file name : Image_13062022164043112.png
|
2022-06-13 16:40:43.211832 |
193 |
35680877 |
Installation of submersible pump with filter infront of Dipak Sarkar House at Sendiya CFC BG TIED |
305000 |
Installation of submersible pump with filter infront of Dipak Sarkar House at Sendiya CFC BG TIED1 |
Roof laid |
-
latitude : 24.973320001736283
Longitude : 88.23727712966502
file name : Image_13062022163244588.png
|
2022-06-13 16:32:44.708165 |
194 |
35712273 |
Construction of drain from Tapan Mitra House towards Shamvu Mandal House at Manaharpur CFC BG TIED |
200000 |
Construction of drain from Tapan Mitra House towards Shamvu Mandal House at Manaharpur CFC BG TIED1 |
Roof laid |
-
latitude : 24.965206,24.965206,24.9647119
Longitude : 88.2214238,88.2214238,88.2252737
file name : Image_18072022134057890.png
|
2022-07-18 13:40:58.008329 |
195 |
35667220 |
Installation of submersible infront Nilay Rai House at Mahadebpur Paschim CFC BG TIED |
305000 |
Installation of submersible infront Nilay Rai House at Mahadebpur Paschim CFC BG TIED1 |
Roof laid |
-
latitude : 24.9679763
Longitude : 88.2148534
file name : Image_25072022170758738.png
|
2022-07-25 17:07:58.85211 |
196 |
35558758 |
Construction of Culvert on the way towards sanjit Mandal House from High road Mohanbagan CFC BG TIED |
400000 |
Construction of Culvert on the way towards sanjit Mandal House from High road Mohanbagan CFC BG TIED1 |
Roof laid |
-
latitude : 24.96345531,24.96346201
Longitude : 88.23545273,88.23545532
file name : Image_30112022161827447.png
|
2022-11-30 16:18:27.543704 |
197 |
66272634 |
Construction of CC Road from Bateswar Sarkar towards Bhabesh Sarkar via Satyendra Nath Sarkar at Mal |
200000 |
Construction of CC Road from Bateswar Sarkar towards Bhabesh Sarkar via Satyendra Nath Sarkar at Mal1 |
Roof laid |
-
latitude : 24.96768728,24.96768506
Longitude : 88.221752,88.22176553
file name : Image_23122022142036661.png
|
2022-12-23 14:20:36.753404 |
198 |
46923318 |
CONSTRUCTION OF CC ROAD FROM HO BIDUBHUSAN PWD ROAD TOWARDS HO BAPAN PRAMANIK AT MAHADEBPUR PURBA |
200000 |
CONSTRUCTION OF CC ROAD FROM HO BIDUBHUSAN PWD ROAD TOWARDS HO BAPAN PRAMANIK AT MAHADEBPUR PURBA1 |
Roof laid |
-
latitude : 24.96817974,24.96817999
Longitude : 88.21701169,88.21700748
file name : Image_30122022151752202.png
|
2022-12-30 15:17:52.30989 |
199 |
47026928 |
CONSTRUCTION OF A ROOM FOR MERSHAL INFRONT OF PARITOSH SARKAR AT DAKSHIN CHAR LAXMIPUR UNTIED |
100000 |
CONSTRUCTION OF A ROOM FOR MERSHAL INFRONT OF PARITOSH SARKAR AT DAKSHIN CHAR LAXMIPUR UNTIED 1 |
Roof laid |
-
latitude : 24.96747903
Longitude : 88.23946828
file name : Image_31122022150155079.png
|
2022-12-31 15:01:55.166266 |
200 |
67817367 |
Repair of drainage channel |
50000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 24.96823248
Longitude : 88.21503862
file name : Image_24042024122213009.png
|
2024-04-24 12:22:13.111985 |
201 |
67817367 |
Repair of drainage channel |
50000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 24.96825641
Longitude : 88.2151301
file name : Image_24042024121712244.png
|
2024-04-24 12:17:12.363771 |
202 |
66274023 |
Construction of Community Sanitary Complex |
300000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.96336082
Longitude : 88.18444085
file name : Image_30012023152629785.png
|
2023-01-30 15:26:29.896458 |
203 |
66274028 |
Construction of Community Sanitary Complex |
300000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.96624805
Longitude : 88.21878531
file name : Image_30012023154128003.png
|
2023-01-30 15:41:28.121952 |
204 |
67053644 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.9652759
Longitude : 88.2223993
file name : Image_01032023162104937.png
|
2023-03-01 16:21:05.051649 |
205 |
67053644 |
Creation of drainage channel for management of grey water |
300000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 24.9652759
Longitude : 88.2223993
file name : Image_01032023161831197.png
|
2023-03-01 16:18:31.296326 |
206 |
46922158 |
INSTALLATION OF SUBMERSIBLE PUMP NEAR HO ANUPAM SARKAR AT BIDHANGAR TIED |
333086 |
INSTALLATION OF SUBMERSIBLE PUMP NEAR HO ANUPAM SARKAR AT BIDHANGAR TIED1 |
Roof laid |
-
latitude : 24.9652757
Longitude : 88.2223966
file name : Image_01032023132314740.png
|
2023-03-01 13:23:14.834796 |
207 |
35661690 |
Installation of High Mast light infront of Durga Mandit at Manaharpur CFC BG |
100000 |
Installation of High Mast light infront of Durga Mandit at Manaharpur CFC BG1 |
Roof laid |
-
latitude : 24.96343308594078
Longitude : 88.22204075753689
file name : Image_07082022102218254.png
|
2022-08-07 10:22:18.381914 |
208 |
101402694 |
Greywater management system |
31746 |
Greywater management system1 |
Roof laid |
-
latitude : 24.96407093
Longitude : 88.18001973
file name : Image_22062024132648325.png
|
2024-06-22 13:26:48.408072 |
209 |
101402694 |
Greywater management system |
31746 |
Greywater management system1 |
Plinth level |
-
latitude : 24.96408403
Longitude : 88.18004227
file name : Image_22062024132306837.png
|
2024-06-22 13:23:06.921038 |
210 |
101402694 |
Greywater management system |
31746 |
Greywater management system1 |
Completion of work |
-
latitude : 24.96410405
Longitude : 88.18004957
file name : Image_22062024131951028.png
|
2024-06-22 13:19:51.130238 |
211 |
67266849 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.97236907,24.97236907
Longitude : 88.23793083,88.23793083
file name : Image_02042024131439869.png
|
2024-04-02 13:14:39.971931 |
212 |
67266849 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.97233374,24.97233245
Longitude : 88.23763404,88.23763426
file name : Image_11032024123043192.png
|
2024-03-11 12:30:43.321611 |
213 |
67266849 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.97242229,24.97242229
Longitude : 88.23762161,88.23762161
file name : Image_09032024134310293.png
|
2024-03-09 13:43:10.386446 |
214 |
67266767 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.97278391,24.97278405
Longitude : 88.23860569,88.23860598
file name : Image_02042024131237887.png
|
2024-04-02 13:12:37.997201 |
215 |
67266767 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.97250522,24.97250522
Longitude : 88.22616307,88.22616307
file name : Image_11032024122502439.png
|
2024-03-11 12:25:02.542725 |
216 |
67266767 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.97280277,24.97280277
Longitude : 88.23859678,88.23859678
file name : Image_09032024133737291.png
|
2024-03-09 13:37:37.381266 |
217 |
67342244 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.96571711,24.96571672
Longitude : 88.20358068,88.20358015
file name : Image_01042024131842828.png
|
2024-04-01 13:18:42.923277 |
218 |
67342244 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.96573521,24.96573521
Longitude : 88.20353392,88.20353392
file name : Image_28032024112834102.png
|
2024-03-28 11:28:34.194246 |
219 |
67342244 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.9631677,24.9631677
Longitude : 88.2041298,88.2041298
file name : Image_09032024130059019.png
|
2024-03-09 13:00:59.122576 |
220 |
67267620 |
Construction of roads |
110000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.96590817,24.96590817
Longitude : 88.21975246,88.21975246
file name : Image_01042024132843176.png
|
2024-04-01 13:28:43.280506 |
221 |
67267620 |
Construction of roads |
110000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.96586718,24.96586718
Longitude : 88.21973484,88.21973484
file name : Image_18032024125855099.png
|
2024-03-18 12:58:55.191428 |
222 |
67267620 |
Construction of roads |
110000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.96589598,24.96589598
Longitude : 88.21976925,88.21976925
file name : Image_14032024112832410.png
|
2024-03-14 11:28:32.491541 |
223 |
67340934 |
Construction of roads |
103950 |
Construction of roads1 |
Plinth level |
-
latitude : 24.96679226,24.96679226
Longitude : 88.17926038,88.17926038
file name : Image_01042024131035197.png
|
2024-04-01 13:10:35.28582 |
224 |
67340934 |
Construction of roads |
103950 |
Construction of roads1 |
Completion of work |
-
latitude : 24.9667526,24.9667526
Longitude : 88.1794392,88.1794392
file name : Image_01042024071149488.png
|
2024-04-01 07:11:49.575386 |
225 |
67341733 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.96349618,24.96349618
Longitude : 88.24014128,88.24014128
file name : Image_01042024160127501.png
|
2024-04-01 16:01:27.60232 |
226 |
67341733 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.96348933,24.96349048
Longitude : 88.24014886,88.24014909
file name : Image_14032024123406667.png
|
2024-03-14 12:34:06.756872 |
227 |
67341733 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.97219983,24.97219983
Longitude : 88.22631197,88.22631197
file name : Image_13032024171019744.png
|
2024-03-13 17:10:19.845947 |
228 |
67267211 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.96413323,24.96413323
Longitude : 88.21859276,88.21859276
file name : Image_01042024132512826.png
|
2024-04-01 13:25:12.917721 |
229 |
67267211 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.96419662,24.96419662
Longitude : 88.21855615,88.21855615
file name : Image_15032024151230906.png
|
2024-03-15 15:12:31.00552 |
230 |
67267211 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.96418728,24.9641895
Longitude : 88.21851911,88.21851207
file name : Image_15032024150521742.png
|
2024-03-15 15:05:21.841123 |
231 |
67627739 |
Augmentation of existing sources of Drinking Water |
150000 |
Augmentation of existing sources of Drinking Water1 |
Roof laid |
-
latitude : 24.96576457
Longitude : 88.21464973
file name : Image_04072024162334540.png
|
2024-07-04 16:23:34.648771 |
232 |
67627739 |
Augmentation of existing sources of Drinking Water |
150000 |
Augmentation of existing sources of Drinking Water1 |
Plinth level |
-
latitude : 24.9680622
Longitude : 88.2146841
file name : Image_17052024123000924.png
|
2024-05-17 12:30:01.020133 |
233 |
67627739 |
Augmentation of existing sources of Drinking Water |
150000 |
Augmentation of existing sources of Drinking Water1 |
Roof laid |
-
latitude : 24.965774
Longitude : 88.21470723
file name : Image_04042024122547782.png
|
2024-04-04 12:25:47.862057 |
234 |
67627739 |
Augmentation of existing sources of Drinking Water |
150000 |
Augmentation of existing sources of Drinking Water1 |
Plinth level |
-
latitude : 24.96573342
Longitude : 88.21469869
file name : Image_04042024121943618.png
|
2024-04-04 12:19:43.70877 |
235 |
67627739 |
Augmentation of existing sources of Drinking Water |
150000 |
Augmentation of existing sources of Drinking Water1 |
Completion of work |
-
latitude : 24.96578411
Longitude : 88.21468646
file name : Image_04042024081316677.png
|
2024-04-04 08:13:16.771666 |
236 |
66273008 |
Construction of Protection Wall from Biplab Biswas towards HO Bibhutibhusan Mandal Mohanbagan und |
200000 |
Construction of Protection Wall from Biplab Biswas towards HO Bibhutibhusan Mandal Mohanbagan und1 |
Roof laid |
-
latitude : 24.96288689
Longitude : 88.2333944
file name : Image_11102023125544074.png
|
2023-10-11 12:55:44.16675 |
237 |
66273008 |
Construction of Protection Wall from Biplab Biswas towards HO Bibhutibhusan Mandal Mohanbagan und |
200000 |
Construction of Protection Wall from Biplab Biswas towards HO Bibhutibhusan Mandal Mohanbagan und1 |
Plinth level |
-
latitude : 24.96283747
Longitude : 88.23337314
file name : Image_11102023124540682.png
|
2023-10-11 12:45:40.777739 |
238 |
66273008 |
Construction of Protection Wall from Biplab Biswas towards HO Bibhutibhusan Mandal Mohanbagan und |
200000 |
Construction of Protection Wall from Biplab Biswas towards HO Bibhutibhusan Mandal Mohanbagan und1 |
Completion of work |
-
latitude : 24.96283752
Longitude : 88.23337447
file name : Image_11102023123701430.png
|
2023-10-11 12:37:01.527754 |
239 |
67342397 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.96893641,24.9689429
Longitude : 88.22629785,88.22631449
file name : Image_05062024130556501.png
|
2024-06-05 13:05:56.589628 |
240 |
67342397 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.96888197,24.96886155
Longitude : 88.22635323,88.22635036
file name : Image_03062024134559142.png
|
2024-06-03 13:45:59.255938 |
241 |
67342397 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.96882071,24.96882086
Longitude : 88.22600992,88.22600976
file name : Image_30052024121402495.png
|
2024-05-30 12:14:02.580297 |
242 |
35547353 |
Installation of submersible pump with Filter near Pranesh Sarkar House at Bidhangar CFC BG TIED |
300000 |
Installation of submersible pump with Filter near Pranesh Sarkar House at Bidhangar CFC BG TIED1 |
Roof laid |
-
latitude : 24.981346428394318
Longitude : 88.22852650657296
file name : Image_07082022103441844.png
|
2022-08-07 10:34:41.968899 |
243 |
35567878 |
Construction of cc road from Sujan mandal House towards Bishnu Haldar House at Anandanagar UNTIED |
100000 |
Construction of cc road from Sujan mandal House towards Bishnu Haldar House at Anandanagar UNTIED1 |
Roof laid |
-
latitude : 24.96791251,24.96790458
Longitude : 88.20901258,88.20885026
file name : Image_29112022155742788.png
|
2022-11-29 15:57:42.900232 |
244 |
67567595 |
Repairing/Construction of Building |
110000 |
Repairing/Construction of Building1 |
Plinth level |
-
latitude : 24.9654935
Longitude : 88.2221912
file name : Image_24052024160502904.png
|
2024-05-24 16:05:02.985509 |
245 |
67567595 |
Repairing/Construction of Building |
110000 |
Repairing/Construction of Building1 |
Completion of work |
-
latitude : 24.96541
Longitude : 88.2221985
file name : Image_24052024155748731.png
|
2024-05-24 15:57:48.812704 |
246 |
58833141 |
CC DRAIN FROM PARITOSH SARKAR HOUSE TOWARDS MARSHALL |
227000 |
CC DRAIN FROM PARITOSH SARKAR HOUSE TOWARDS MARSHALL1 |
Roof laid |
-
latitude : 24.96740474,24.96740474
Longitude : 88.2394582,88.2394582
file name : Image_09082023110556628.png
|
2023-08-09 11:05:56.729387 |
247 |
58833141 |
CC DRAIN FROM PARITOSH SARKAR HOUSE TOWARDS MARSHALL |
227000 |
CC DRAIN FROM PARITOSH SARKAR HOUSE TOWARDS MARSHALL1 |
Plinth level |
-
latitude : 24.96742161,24.96742163
Longitude : 88.23946534,88.23946536
file name : Image_09082023105610562.png
|
2023-08-09 10:56:10.721269 |
248 |
58833141 |
CC DRAIN FROM PARITOSH SARKAR HOUSE TOWARDS MARSHALL |
227000 |
CC DRAIN FROM PARITOSH SARKAR HOUSE TOWARDS MARSHALL1 |
Completion of work |
-
latitude : 24.96743144,24.96743144
Longitude : 88.23948779,88.23948779
file name : Image_09082023105257526.png
|
2023-08-09 10:52:57.62681 |
249 |
58833141 |
CC DRAIN FROM PARITOSH SARKAR HOUSE TOWARDS MARSHALL |
227000 |
CC DRAIN FROM PARITOSH SARKAR HOUSE TOWARDS MARSHALL1 |
Completion of work |
-
latitude : 24.9674416,24.96744165
Longitude : 88.23948431,88.23948432
file name : Image_07082023160229362.png
|
2023-08-07 16:02:29.455519 |
250 |
77147106 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.96682912
Longitude : 88.23196763
file name : Image_09082023112646077.png
|
2023-08-09 11:26:46.191473 |
251 |
77147106 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.9668291
Longitude : 88.23196658
file name : Image_09082023112354261.png
|
2023-08-09 11:23:54.382069 |
252 |
77147106 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.96681699
Longitude : 88.231978
file name : Image_09082023112107447.png
|
2023-08-09 11:21:07.57687 |
253 |
77147106 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.96682548
Longitude : 88.23200227
file name : Image_07082023150932439.png
|
2023-08-07 15:09:32.53465 |
254 |
77148990 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.96295527
Longitude : 88.22219156
file name : Image_08082023160602175.png
|
2023-08-08 16:06:02.345485 |
255 |
77148990 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.96297023
Longitude : 88.22216504
file name : Image_08082023160224112.png
|
2023-08-08 16:02:24.301492 |
256 |
77148990 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.96296727
Longitude : 88.22214079
file name : Image_05082023172500018.png
|
2023-08-05 17:25:00.128853 |
257 |
77134796 |
CONSTRUCTION OF ROAD WITH BRICKS FROM KISTO CHOWDHURY LAND TOWARDS SUKHDEB BISWAS LAND ATG NEMUA |
105000 |
CONSTRUCTION OF ROAD WITH BRICKS FROM KISTO CHOWDHURY LAND TOWARDS SUKHDEB BISWAS LAND ATG NEMUA1 |
Roof laid |
-
latitude : 24.97047534,24.97047534,24.97047534
Longitude : 88.20290134,88.20290134,88.20290134
file name : Image_09082023132541944.png
|
2023-08-09 13:25:42.046379 |
258 |
77134796 |
CONSTRUCTION OF ROAD WITH BRICKS FROM KISTO CHOWDHURY LAND TOWARDS SUKHDEB BISWAS LAND ATG NEMUA |
105000 |
CONSTRUCTION OF ROAD WITH BRICKS FROM KISTO CHOWDHURY LAND TOWARDS SUKHDEB BISWAS LAND ATG NEMUA1 |
Plinth level |
-
latitude : 24.97049204,24.97049204,24.97049206
Longitude : 88.20287926,88.20287926,88.20287927
file name : Image_09082023131126258.png
|
2023-08-09 13:11:26.352248 |
259 |
77134796 |
CONSTRUCTION OF ROAD WITH BRICKS FROM KISTO CHOWDHURY LAND TOWARDS SUKHDEB BISWAS LAND ATG NEMUA |
105000 |
CONSTRUCTION OF ROAD WITH BRICKS FROM KISTO CHOWDHURY LAND TOWARDS SUKHDEB BISWAS LAND ATG NEMUA1 |
Completion of work |
-
latitude : 24.97053118,24.97053124
Longitude : 88.20283825,88.20283834
file name : Image_03082023163606262.png
|
2023-08-03 16:36:06.580863 |
260 |
58825143 |
CC DRAIN FROM PALASH BISWAS TOWARDES NARESH HALDER HOUSE |
227000 |
CC DRAIN FROM PALASH BISWAS TOWARDES NARESH HALDER HOUSE1 |
Roof laid |
-
latitude : 24.96339446,24.96339446
Longitude : 88.24028335,88.24028335
file name : Image_23092023180132941.png
|
2023-09-23 18:01:33.04702 |
261 |
58825143 |
CC DRAIN FROM PALASH BISWAS TOWARDES NARESH HALDER HOUSE |
227000 |
CC DRAIN FROM PALASH BISWAS TOWARDES NARESH HALDER HOUSE1 |
Plinth level |
-
latitude : 24.9622969,24.9622969
Longitude : 88.2404897,88.2404897
file name : Image_23092023175745454.png
|
2023-09-23 17:57:45.570372 |
262 |
58825143 |
CC DRAIN FROM PALASH BISWAS TOWARDES NARESH HALDER HOUSE |
227000 |
CC DRAIN FROM PALASH BISWAS TOWARDES NARESH HALDER HOUSE1 |
Completion of work |
-
latitude : 24.96325306,24.96325306
Longitude : 88.24018792,88.24018792
file name : Image_23092023175055243.png
|
2023-09-23 17:50:55.342393 |
263 |
58825143 |
CC DRAIN FROM PALASH BISWAS TOWARDES NARESH HALDER HOUSE |
227000 |
CC DRAIN FROM PALASH BISWAS TOWARDES NARESH HALDER HOUSE1 |
Completion of work |
-
latitude : 24.9622969,24.9622969
Longitude : 88.2404897,88.2404897
file name : Image_23092023173252870.png
|
2023-09-23 17:32:52.960902 |
264 |
67132471 |
Construction of CC Road house of Santosh Basak towards house of Ramkrishna Basak at Charlaxmipur |
95000 |
Construction of CC Road house of Santosh Basak towards house of Ramkrishna Basak at Charlaxmipur1 |
Roof laid |
-
latitude : 24.96866474,24.96866466
Longitude : 88.2405198,88.24051973
file name : Image_24042023152330926.png
|
2023-04-24 15:23:31.034344 |
265 |
67133973 |
Construction of Community Sanitary Complex |
96000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.96543738,24.96543738
Longitude : 88.22115605,88.22115605
file name : Image_19052023144820577.png
|
2023-05-19 14:48:20.677277 |
266 |
58896890 |
CC ROAD FROM BABLU MANDAL LAND TOWARDS AJAY PRAMANIK LAND AT MAHAJUMPARA |
143000 |
CC ROAD FROM BABLU MANDAL LAND TOWARDS AJAY PRAMANIK LAND AT MAHAJUMPARA1 |
Roof laid |
-
latitude : 24.96501785,24.96501785
Longitude : 88.21845052,88.21845052
file name : Image_11052023150901109.png
|
2023-05-11 15:09:01.210433 |
267 |
58846378 |
SUB MARSHALL PUMP INFRONT OF SUKUMAR SARKAR HOUSE AT ANANDANAGAR |
300000 |
SUB MARSHALL PUMP INFRONT OF SUKUMAR SARKAR HOUSE AT ANANDANAGAR1 |
Roof laid |
-
latitude : 24.96953785
Longitude : 88.21122541
file name : Image_11062023140005025.png
|
2023-06-11 14:00:05.134506 |
268 |
58891413 |
SUB MARSHALL PUMP INFRONT OF MATHUR HALDER HOUSE AT MAHADEBPUR PURBA |
272000 |
SUB MARSHALL PUMP INFRONT OF MATHUR HALDER HOUSE AT MAHADEBPUR PURBA1 |
Roof laid |
-
latitude : 24.96921154
Longitude : 88.21852717
file name : Image_11062023140502168.png
|
2023-06-11 14:05:02.301146 |
269 |
67818008 |
Repair of drainage channel |
50000 |
Repair of drainage channel |
Roof laid |
-
latitude : 24.96964978
Longitude : 88.22681073
file name : Image_02042024151625042.png
|
2024-04-02 15:16:25.143931 |
270 |
67818008 |
Repair of drainage channel |
50000 |
Repair of drainage channel |
Plinth level |
-
latitude : 24.96966391
Longitude : 88.22683151
file name : Image_02042024151028593.png
|
2024-04-02 15:10:28.679151 |
271 |
67818008 |
Repair of drainage channel |
50000 |
Repair of drainage channel |
Completion of work |
-
latitude : 24.96960047
Longitude : 88.22683448
file name : Image_02042024150247787.png
|
2024-04-02 15:02:47.86929 |
272 |
47033649 |
CONSTRUCTION OF PROTECTION WALL FROM H KARTIK MRIDHA TOWARDS HO DILIP MRIDHA AT MOHANBAGAN TIED |
383708 |
CONSTRUCTION OF PROTECTION WALL FROM H KARTIK MRIDHA TOWARDS HO DILIP MRIDHA AT MOHANBAGAN TIED1 |
Roof laid |
-
latitude : 24.96282106
Longitude : 88.23311376
file name : Image_11102023125456750.png
|
2023-10-11 12:54:56.839627 |
273 |
47033649 |
CONSTRUCTION OF PROTECTION WALL FROM H KARTIK MRIDHA TOWARDS HO DILIP MRIDHA AT MOHANBAGAN TIED |
383708 |
CONSTRUCTION OF PROTECTION WALL FROM H KARTIK MRIDHA TOWARDS HO DILIP MRIDHA AT MOHANBAGAN TIED1 |
Plinth level |
-
latitude : 24.96282892
Longitude : 88.23307386
file name : Image_11102023124643891.png
|
2023-10-11 12:46:43.98388 |
274 |
47033649 |
CONSTRUCTION OF PROTECTION WALL FROM H KARTIK MRIDHA TOWARDS HO DILIP MRIDHA AT MOHANBAGAN TIED |
383708 |
CONSTRUCTION OF PROTECTION WALL FROM H KARTIK MRIDHA TOWARDS HO DILIP MRIDHA AT MOHANBAGAN TIED1 |
Completion of work |
-
latitude : 24.96278433
Longitude : 88.23299557
file name : Image_11102023123526800.png
|
2023-10-11 12:35:26.90594 |
275 |
66272693 |
Construction of Protection Wall from Utpal Biswas towards Dakshin Charlaxmipur under Muchia GP UNTIE |
200000 |
Construction of Protection Wall from Utpal Biswas towards Dakshin Charlaxmipur under Muchia GP UNTIE1 |
Roof laid |
-
latitude : 24.96782557
Longitude : 88.23922215
file name : Image_17102023150256039.png
|
2023-10-17 15:02:56.13783 |
276 |
66272693 |
Construction of Protection Wall from Utpal Biswas towards Dakshin Charlaxmipur under Muchia GP UNTIE |
200000 |
Construction of Protection Wall from Utpal Biswas towards Dakshin Charlaxmipur under Muchia GP UNTIE1 |
Roof laid |
-
latitude : 24.96785023
Longitude : 88.23918177
file name : Image_19012023153940712.png
|
2023-01-19 15:39:40.823812 |
277 |
77136158 |
CONSTRUCTION OF ROAD WITH BRICKS BATS AND EARTH FROM NARAYAN DAS LAND TO TEMOHINI VIA GREAT BANAYAN |
105000 |
CONSTRUCTION OF ROAD WITH BRICKS BATS AND EARTH FROM NARAYAN DAS LAND TO TEMOHINI VIA GREAT BANAYAN 1 |
Roof laid |
-
latitude : 24.98042985,24.98048549
Longitude : 88.20335333,88.20338082
file name : Image_10062024163952868.png
|
2024-06-10 16:39:52.982552 |
278 |
77136158 |
CONSTRUCTION OF ROAD WITH BRICKS BATS AND EARTH FROM NARAYAN DAS LAND TO TEMOHINI VIA GREAT BANAYAN |
105000 |
CONSTRUCTION OF ROAD WITH BRICKS BATS AND EARTH FROM NARAYAN DAS LAND TO TEMOHINI VIA GREAT BANAYAN 1 |
Plinth level |
-
latitude : 24.98041093,24.98041193
Longitude : 88.20336258,88.20336225
file name : Image_09062024100737589.png
|
2024-06-09 10:07:37.681066 |
279 |
77136158 |
CONSTRUCTION OF ROAD WITH BRICKS BATS AND EARTH FROM NARAYAN DAS LAND TO TEMOHINI VIA GREAT BANAYAN |
105000 |
CONSTRUCTION OF ROAD WITH BRICKS BATS AND EARTH FROM NARAYAN DAS LAND TO TEMOHINI VIA GREAT BANAYAN 1 |
Completion of work |
-
latitude : 24.98055664,24.98074434
Longitude : 88.20345753,88.20362642
file name : Image_06062024171642699.png
|
2024-06-06 17:16:42.809591 |
280 |
58910016 |
RENNOVATION OF GP OFFICE |
150000 |
RENNOVATION OF GP OFFICE1 |
Plinth level |
-
latitude : 24.965407
Longitude : 88.2223868
file name : Image_11062024083426866.png
|
2024-06-11 08:34:26.960285 |
281 |
58910016 |
RENNOVATION OF GP OFFICE |
150000 |
RENNOVATION OF GP OFFICE1 |
Completion of work |
-
latitude : 24.96544984
Longitude : 88.22230901
file name : Image_10062024154544982.png
|
2024-06-10 15:45:45.119287 |
282 |
101398285 |
Greywater management system |
31746 |
Greywater management system1 |
Roof laid |
-
latitude : 24.95997048
Longitude : 88.18939314
file name : Image_22062024135137416.png
|
2024-06-22 13:51:37.500819 |
283 |
101398285 |
Greywater management system |
31746 |
Greywater management system1 |
Plinth level |
-
latitude : 24.9599805
Longitude : 88.18937177
file name : Image_14062024141908760.png
|
2024-06-14 14:19:08.625663 |
284 |
101398285 |
Greywater management system |
31746 |
Greywater management system1 |
Completion of work |
-
latitude : 24.95999001
Longitude : 88.18933426
file name : Image_14062024141316522.png
|
2024-06-14 14:13:16.627188 |
285 |
101398591 |
Greywater management system |
31746 |
Greywater management system1 |
Roof laid |
-
latitude : 24.96028698
Longitude : 88.18628488
file name : Image_22062024134613096.png
|
2024-06-22 13:46:13.18054 |
286 |
101398591 |
Greywater management system |
31746 |
Greywater management system1 |
Plinth level |
-
latitude : 24.96031651
Longitude : 88.18626677
file name : Image_14062024143039423.png
|
2024-06-14 14:30:39.515272 |
287 |
101398591 |
Greywater management system |
31746 |
Greywater management system1 |
Completion of work |
-
latitude : 24.96030507
Longitude : 88.18627407
file name : Image_14062024142547776.png
|
2024-06-14 14:25:47.861555 |
288 |
101400325 |
Greywater management system |
31746 |
Greywater management system1 |
Roof laid |
-
latitude : 24.96878907
Longitude : 88.214291
file name : Image_22062024135855788.png
|
2024-06-22 13:58:55.882041 |
289 |
101400325 |
Greywater management system |
31746 |
Greywater management system1 |
Plinth level |
-
latitude : 24.96885496
Longitude : 88.21427613
file name : Image_14062024154617003.png
|
2024-06-14 15:46:17.116994 |
290 |
101400325 |
Greywater management system |
31746 |
Greywater management system1 |
Completion of work |
-
latitude : 24.96881827
Longitude : 88.21426883
file name : Image_14062024154204553.png
|
2024-06-14 15:42:04.655374 |
291 |
101403204 |
Greywater management system |
31746 |
Greywater management system1 |
Roof laid |
-
latitude : 24.96325156
Longitude : 88.18443525
file name : Image_22062024134123539.png
|
2024-06-22 13:41:23.632268 |
292 |
101403204 |
Greywater management system |
31746 |
Greywater management system1 |
Plinth level |
-
latitude : 24.96327168
Longitude : 88.18443798
file name : Image_14062024144521300.png
|
2024-06-14 14:45:21.38596 |
293 |
101403204 |
Greywater management system |
31746 |
Greywater management system1 |
Completion of work |
-
latitude : 24.96327658
Longitude : 88.18444604
file name : Image_14062024143918957.png
|
2024-06-14 14:39:19.04153 |
294 |
101402192 |
Greywater management system |
31746 |
Greywater management system1 |
Roof laid |
-
latitude : 24.96735272
Longitude : 88.17934146
file name : Image_22062024133404664.png
|
2024-06-22 13:34:04.742883 |
295 |
101402192 |
Greywater management system |
31746 |
Greywater management system1 |
Plinth level |
-
latitude : 24.96735036
Longitude : 88.17935268
file name : Image_14062024152258620.png
|
2024-06-14 15:22:58.764039 |
296 |
101402192 |
Greywater management system |
31746 |
Greywater management system1 |
Completion of work |
-
latitude : 24.96735207
Longitude : 88.17934172
file name : Image_14062024151219704.png
|
2024-06-14 15:12:19.799912 |
297 |
58842384 |
SUB MARSHALL PUMP INFRONT OF GOMBHIRA TOLA AT GOLAPATTI |
272000 |
SUB MARSHALL PUMP INFRONT OF GOMBHIRA TOLA AT GOLAPATTI1 |
Roof laid |
-
latitude : 24.9606446
Longitude : 88.2284701
file name : Image_11062023141141502.png
|
2023-06-11 14:11:41.625426 |
298 |
67438436 |
Drinking water facilities |
247000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.96691853
Longitude : 88.20076568
file name : Image_03072024134837566.png
|
2024-07-03 13:48:37.663193 |
299 |
67438436 |
Drinking water facilities |
247000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.96688175
Longitude : 88.20070939
file name : Image_22062024130211268.png
|
2024-06-22 13:02:11.372945 |
300 |
67438436 |
Drinking water facilities |
247000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 24.96691966
Longitude : 88.20073959
file name : Image_22062024125600960.png
|
2024-06-22 12:56:01.057457 |
301 |
67135325 |
Construction of Community Sanitary Complex |
94000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.96730759,24.96730759
Longitude : 88.1780089,88.1780089
file name : Image_08082023144122352.png
|
2023-08-08 14:41:22.455193 |
302 |
67135325 |
Construction of Community Sanitary Complex |
94000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.9673473,24.9673473,24.96734731
Longitude : 88.17794489,88.17794489,88.17794491
file name : Image_08082023143501719.png
|
2023-08-08 14:35:01.818737 |
303 |
67135325 |
Construction of Community Sanitary Complex |
94000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.96730578,24.96730578
Longitude : 88.17804252,88.17804252
file name : Image_08082023142329966.png
|
2023-08-08 14:23:30.060257 |
304 |
67135325 |
Construction of Community Sanitary Complex |
94000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.96730005,24.96730005
Longitude : 88.17798048,88.17798048
file name : Image_04082023140404601.png
|
2023-08-04 14:04:04.693822 |
305 |
67135325 |
Construction of Community Sanitary Complex |
94000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.96731329,24.96731332,24.96731332
Longitude : 88.17801517,88.17801517,88.17801517
file name : Image_04082023140407654.png
|
2023-08-04 14:04:07.740656 |
306 |
67135325 |
Construction of Community Sanitary Complex |
94000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.96730767,24.96730767
Longitude : 88.17802626,88.17802626
file name : Image_04082023140410509.png
|
2023-08-04 14:04:10.59847 |
307 |
67135163 |
Construction of Community Sanitary Complex |
95000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.97220203,24.97220203,24.97220203
Longitude : 88.23887818,88.23887818,88.23887818
file name : Image_08082023174329605.png
|
2023-08-08 17:43:29.704265 |
308 |
67135163 |
Construction of Community Sanitary Complex |
95000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.97221497,24.97221497
Longitude : 88.23888136,88.23888136
file name : Image_08082023173625871.png
|
2023-08-08 17:36:25.967558 |
309 |
67135163 |
Construction of Community Sanitary Complex |
95000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.97218274,24.97218274
Longitude : 88.23883572,88.23883572
file name : Image_04082023161641571.png
|
2023-08-04 16:16:41.800906 |
310 |
67134148 |
Construction of Community Sanitary Complex |
96000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.96756567,24.96756567,24.96756567
Longitude : 88.23849723,88.23849723,88.23849723
file name : Image_09082023104810728.png
|
2023-08-09 10:48:10.824516 |
311 |
67134148 |
Construction of Community Sanitary Complex |
96000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.9650898,24.9650898,24.96757058
Longitude : 88.2258824,88.2258824,88.23850612
file name : Image_09082023104412442.png
|
2023-08-09 10:44:12.538367 |
312 |
67134148 |
Construction of Community Sanitary Complex |
96000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.96760302,24.96760302
Longitude : 88.23845474,88.23845474
file name : Image_04082023162333839.png
|
2023-08-04 16:23:33.943768 |
313 |
77146492 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.96882761
Longitude : 88.21427249
file name : Image_08082023154704882.png
|
2023-08-08 15:47:05.049238 |
314 |
77146492 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.96881228
Longitude : 88.2142821
file name : Image_08082023154300750.png
|
2023-08-08 15:43:00.987665 |
315 |
77146492 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.96880425
Longitude : 88.21429263
file name : Image_05082023170250456.png
|
2023-08-05 17:02:50.572506 |
316 |
58895134 |
CONSTRUCTION OF SITTING BENCH INFRONT OF BINAPANI CLUB AT MAHAJUMPARA |
120000 |
CONSTRUCTION OF SITTING BENCH INFRONT OF BINAPANI CLUB AT MAHAJUMPARA1 |
Roof laid |
-
latitude : 24.96629563
Longitude : 88.21870358
file name : Image_17112023142114290.png
|
2023-11-17 14:21:14.3727 |
317 |
58895134 |
CONSTRUCTION OF SITTING BENCH INFRONT OF BINAPANI CLUB AT MAHAJUMPARA |
120000 |
CONSTRUCTION OF SITTING BENCH INFRONT OF BINAPANI CLUB AT MAHAJUMPARA1 |
Plinth level |
-
latitude : 24.96633183
Longitude : 88.21866724
file name : Image_17112023141708885.png
|
2023-11-17 14:17:09.021613 |
318 |
58895134 |
CONSTRUCTION OF SITTING BENCH INFRONT OF BINAPANI CLUB AT MAHAJUMPARA |
120000 |
CONSTRUCTION OF SITTING BENCH INFRONT OF BINAPANI CLUB AT MAHAJUMPARA1 |
Completion of work |
-
latitude : 24.96634252
Longitude : 88.21877771
file name : Image_08112023144314008.png
|
2023-11-08 14:43:14.254499 |