1 |
56865837 |
ROAD REPAIR AT MOUZA SUKRULLAPUR FROM THE HO JALADHAR MAITY TO THE SHOP OF ANUP BARIK VIA SATYARANJA |
200000 |
ROAD REPAIR AT MOUZA SUKRULLAPUR FROM THE HO JALADHAR MAITY TO THE SHOP OF ANUP BARIK VIA SATYARANJA1 |
Completion of work |
-
latitude : 22.01017413,22.01017698
Longitude : 87.77935464,87.77934264
file name : Image_22092023162144588.png
|
2023-09-22 16:21:44.666785 |
2 |
56865837 |
ROAD REPAIR AT MOUZA SUKRULLAPUR FROM THE HO JALADHAR MAITY TO THE SHOP OF ANUP BARIK VIA SATYARANJA |
200000 |
ROAD REPAIR AT MOUZA SUKRULLAPUR FROM THE HO JALADHAR MAITY TO THE SHOP OF ANUP BARIK VIA SATYARANJA1 |
Completion of work |
-
latitude : 22.0100276,22.00987238
Longitude : 87.77873364,87.77878874
file name : Image_22092023161607111.png
|
2023-09-22 16:16:07.17985 |
3 |
34023867 |
Upgradation of CC Road at mouza Shyamchak |
300000 |
Upgradation of CC Road at mouza Shyamchak1 |
Roof laid |
-
latitude : 22.058558333333334,22.058521666666667
Longitude : 87.75607666666669,87.75610499999999
file name : Image_24022021171825165.png
|
2021-02-24 17:18:25.24669 |
4 |
34023867 |
Upgradation of CC Road at mouza Shyamchak |
300000 |
Upgradation of CC Road at mouza Shyamchak1 |
Plinth level |
-
latitude : 22.05870333333333,22.058638333333338
Longitude : 87.75613833333334,87.75610666666668
file name : Image_19022021154253655.png
|
2021-02-19 15:42:53.759744 |
5 |
34023867 |
Upgradation of CC Road at mouza Shyamchak |
300000 |
Upgradation of CC Road at mouza Shyamchak1 |
Completion of work |
-
latitude : 22.058535,22.058513333333334
Longitude : 87.75607333333333,87.75602166666667
file name : Image_19022021153531822.png
|
2021-02-19 15:35:31.931192 |
6 |
34020579 |
Upgradation of CC Road at Mouza BalaramChak |
300000 |
Upgradation of CC Road at Mouza BalaramChak1 |
Roof laid |
-
latitude : 22.043041666666667,22.043065000000002
Longitude : 87.76294833333334,87.76297833333335
file name : Image_24022021170002271.png
|
2021-02-24 17:00:02.390166 |
7 |
34020579 |
Upgradation of CC Road at Mouza BalaramChak |
300000 |
Upgradation of CC Road at Mouza BalaramChak1 |
Plinth level |
-
latitude : 22.04296,22.04307833333333
Longitude : 87.763075,87.76262333333334
file name : Image_19022021144852676.png
|
2021-02-19 14:48:52.792214 |
8 |
34020579 |
Upgradation of CC Road at Mouza BalaramChak |
300000 |
Upgradation of CC Road at Mouza BalaramChak1 |
Completion of work |
-
latitude : 22.042923333333338,22.043020000000002
Longitude : 87.76292833333333,87.76289333333334
file name : Image_19022021144143751.png
|
2021-02-19 14:41:43.856398 |
9 |
34015034 |
Upgradation of CC Road at mouza Ashutia |
300000 |
Upgradation of CC Road at mouza Ashutia1 |
Roof laid |
-
latitude : 22.037823333333336,22.037876666666662
Longitude : 87.77371833333333,87.77371166666666
file name : Image_07032021100158307.png
|
2021-03-07 10:01:58.386938 |
10 |
34015034 |
Upgradation of CC Road at mouza Ashutia |
300000 |
Upgradation of CC Road at mouza Ashutia1 |
Plinth level |
-
latitude : 22.03783,22.037820000000004
Longitude : 87.77371999999998,87.773715
file name : Image_26022021140945309.png
|
2021-02-26 14:09:45.403036 |
11 |
34015034 |
Upgradation of CC Road at mouza Ashutia |
300000 |
Upgradation of CC Road at mouza Ashutia1 |
Completion of work |
-
latitude : 22.03776833333333,22.037760000000002
Longitude : 87.77367000000001,87.77367000000001
file name : Image_22022021124932409.png
|
2021-02-22 12:49:32.52144 |
12 |
34023922 |
Upgradation of CC Road at Mouza Gumkia |
300000 |
Upgradation of CC Road at Mouza Gumkia1 |
Roof laid |
-
latitude : 22.061191666666666,22.06134833333333
Longitude : 87.76897,87.76921499999999
file name : Image_26022021142541795.png
|
2021-02-26 14:25:41.898898 |
13 |
34023922 |
Upgradation of CC Road at Mouza Gumkia |
300000 |
Upgradation of CC Road at Mouza Gumkia1 |
Plinth level |
-
latitude : 22.061280000000004,22.061320000000002
Longitude : 87.76917499999999,87.76916833333334
file name : Image_19022021152151031.png
|
2021-02-19 15:21:51.12912 |
14 |
34023922 |
Upgradation of CC Road at Mouza Gumkia |
300000 |
Upgradation of CC Road at Mouza Gumkia1 |
Completion of work |
-
latitude : 22.06127333333333,22.06125666666667
Longitude : 87.76918166666668,87.76912333333333
file name : Image_19022021150527376.png
|
2021-02-19 15:05:27.469696 |
15 |
33990678 |
Upgradation of CC Road at Mouza Kotebarh |
300000 |
Upgradation of CC Road at Mouza Kotebarh1 |
Plinth level |
-
latitude : 22.042616666666664,22.042616666666664
Longitude : 87.78249333333333,87.78249333333333
file name : Image_26022021144240397.png
|
2021-02-26 14:42:40.503749 |
16 |
33990678 |
Upgradation of CC Road at Mouza Kotebarh |
300000 |
Upgradation of CC Road at Mouza Kotebarh1 |
Completion of work |
-
latitude : 22.042576666666665,22.04255333333333
Longitude : 87.78255333333333,87.78254666666665
file name : Image_24022021112108572.png
|
2021-02-24 11:21:08.672484 |
17 |
33990084 |
Upgradation of CC Road at mouza Purba Radhapur |
300000 |
Upgradation of CC Road at mouza Purba Radhapur1 |
Roof laid |
-
latitude : 22.023979999999998,22.023979999999998
Longitude : 87.74561,87.74561
file name : Image_02032021115316764.png
|
2021-03-02 11:53:16.899728 |
18 |
33990084 |
Upgradation of CC Road at mouza Purba Radhapur |
300000 |
Upgradation of CC Road at mouza Purba Radhapur1 |
Roof laid |
-
latitude : 22.024006666666665,22.02395333333333
Longitude : 87.74554666666667,87.74558666666665
file name : Image_02032021115324108.png
|
2021-03-02 11:53:24.225944 |
19 |
33990084 |
Upgradation of CC Road at mouza Purba Radhapur |
300000 |
Upgradation of CC Road at mouza Purba Radhapur1 |
Roof laid |
-
latitude : 22.02389333333333,22.023888333333336
Longitude : 87.74551500000001,87.74558666666665
file name : Image_02032021115330360.png
|
2021-03-02 11:53:30.484793 |
20 |
33990084 |
Upgradation of CC Road at mouza Purba Radhapur |
300000 |
Upgradation of CC Road at mouza Purba Radhapur1 |
Plinth level |
-
latitude : 22.023934999999998,22.023778333333333
Longitude : 87.74556,87.74539666666666
file name : Image_26022021134903560.png
|
2021-02-26 13:49:03.678934 |
21 |
33990084 |
Upgradation of CC Road at mouza Purba Radhapur |
300000 |
Upgradation of CC Road at mouza Purba Radhapur1 |
Completion of work |
-
latitude : 22.023945000000005,22.02393833333333
Longitude : 87.74558,87.74546666666666
file name : Image_22022021125022065.png
|
2021-02-22 12:50:22.189913 |
22 |
34004858 |
Extension of water pipe line at mouza Shukrullapur |
100000 |
Extension of water pipe line at mouza Shukrullapur1 |
Roof laid |
-
latitude : 22.01691443,22.01693501
Longitude : 87.76633055,87.76631889
file name : Image_11022022133643928.png
|
2022-02-11 13:36:44.035128 |
23 |
34004858 |
Extension of water pipe line at mouza Shukrullapur |
100000 |
Extension of water pipe line at mouza Shukrullapur1 |
Plinth level |
-
latitude : 22.01692086,22.01692263
Longitude : 87.76632816,87.76632709
file name : Image_11022022133316823.png
|
2022-02-11 13:33:16.933786 |
24 |
34004858 |
Extension of water pipe line at mouza Shukrullapur |
100000 |
Extension of water pipe line at mouza Shukrullapur1 |
Completion of work |
-
latitude : 22.01688308,22.016654
Longitude : 87.76631832,87.7663658
file name : Image_11022022132858077.png
|
2022-02-11 13:28:58.174418 |
25 |
34026115 |
Sinking of Tube Well with Pump at mouza Kotebarh |
250000 |
Sinking of Tube Well with Pump at mouza Kotebarh1 |
Plinth level |
-
latitude : 22.03897336
Longitude : 87.77205442
file name : Image_17072021120350175.png
|
2021-07-17 12:03:50.267319 |
26 |
34026115 |
Sinking of Tube Well with Pump at mouza Kotebarh |
250000 |
Sinking of Tube Well with Pump at mouza Kotebarh1 |
Completion of work |
-
latitude : 22.03899291
Longitude : 87.77202269
file name : Image_17072021115159433.png
|
2021-07-17 11:51:59.551156 |
27 |
33998742 |
Extension of water pipe line at mouza Sukrullapur |
145000 |
Extension of water pipe line at mouza Sukrullapur1 |
Roof laid |
-
latitude : 22.01572391,22.01572611
Longitude : 87.78086495,87.7808665
file name : Image_22012022144536379.png
|
2022-01-22 14:45:36.48878 |
28 |
33998742 |
Extension of water pipe line at mouza Sukrullapur |
145000 |
Extension of water pipe line at mouza Sukrullapur1 |
Plinth level |
-
latitude : 22.01576003,22.01575744
Longitude : 87.78086277,87.7808628
file name : Image_22012022143959471.png
|
2022-01-22 14:39:59.579011 |
29 |
33998742 |
Extension of water pipe line at mouza Sukrullapur |
145000 |
Extension of water pipe line at mouza Sukrullapur1 |
Completion of work |
-
latitude : 22.01573824,22.01575139
Longitude : 87.78085894,87.78086443
file name : Image_22012022143543384.png
|
2022-01-22 14:35:43.510125 |
30 |
39111160 |
sinking of Tubewell with pump at mouza Kotebarh |
250000 |
sinking of Tubewell with pump at mouza Kotebarh1 |
Roof laid |
-
latitude : 22.045064619742334
Longitude : 87.78246575966477
file name : Image_09042021171130820.png
|
2021-04-09 17:11:30.87205 |
31 |
39111160 |
sinking of Tubewell with pump at mouza Kotebarh |
250000 |
sinking of Tubewell with pump at mouza Kotebarh1 |
Plinth level |
-
latitude : 22.04507953952998
Longitude : 87.78242527507246
file name : Image_09042021170331752.png
|
2021-04-09 17:03:31.795652 |
32 |
39111160 |
sinking of Tubewell with pump at mouza Kotebarh |
250000 |
sinking of Tubewell with pump at mouza Kotebarh1 |
Completion of work |
-
latitude : 22.0451224129647
Longitude : 87.78236207552254
file name : Image_09042021095454865.png
|
2021-04-09 09:54:54.965769 |
33 |
34019634 |
Extension of water pipe line at Mouza Ashutia |
100000 |
Extension of water pipe line at Mouza Ashutia1 |
Roof laid |
-
latitude : 22.03468365,22.03468667
Longitude : 87.76920261,87.76919927
file name : Image_22012022141159090.png
|
2022-01-22 14:11:59.178155 |
34 |
34019634 |
Extension of water pipe line at Mouza Ashutia |
100000 |
Extension of water pipe line at Mouza Ashutia1 |
Plinth level |
-
latitude : 22.03471318,22.03470039
Longitude : 87.76918857,87.76920228
file name : Image_22012022140452933.png
|
2022-01-22 14:04:53.011851 |
35 |
34019634 |
Extension of water pipe line at Mouza Ashutia |
100000 |
Extension of water pipe line at Mouza Ashutia1 |
Plinth level |
-
latitude : 22.03555408,22.03555411
Longitude : 87.76925496,87.76925492
file name : Image_04012022114807530.png
|
2022-01-04 11:48:07.653854 |
36 |
34019634 |
Extension of water pipe line at Mouza Ashutia |
100000 |
Extension of water pipe line at Mouza Ashutia1 |
Completion of work |
-
latitude : 22.03521356,22.03522698
Longitude : 87.76925703,87.76926834
file name : Image_03012022141147357.png
|
2022-01-03 14:11:47.470042 |
37 |
34020037 |
Extension of water pipe line at mouza Ashutia |
100000 |
Extension of water pipe line at mouza Ashutia1 |
Roof laid |
-
latitude : 22.03779989,22.03778987
Longitude : 87.76973366,87.76974286
file name : Image_22012022135648857.png
|
2022-01-22 13:56:48.965968 |
38 |
34020037 |
Extension of water pipe line at mouza Ashutia |
100000 |
Extension of water pipe line at mouza Ashutia1 |
Plinth level |
-
latitude : 22.03777472,22.03776859
Longitude : 87.76977093,87.76977081
file name : Image_22012022134755940.png
|
2022-01-22 13:47:56.045548 |
39 |
34020037 |
Extension of water pipe line at mouza Ashutia |
100000 |
Extension of water pipe line at mouza Ashutia1 |
Plinth level |
-
latitude : 22.03630397,22.03631
Longitude : 87.76925869,87.76926337
file name : Image_04012022114250894.png
|
2022-01-04 11:42:51.044083 |
40 |
34020037 |
Extension of water pipe line at mouza Ashutia |
100000 |
Extension of water pipe line at mouza Ashutia1 |
Completion of work |
-
latitude : 22.03769675,22.03768137
Longitude : 87.76975572,87.76976681
file name : Image_03012022141144057.png
|
2022-01-03 14:11:44.170178 |
41 |
33999610 |
Extension of water pipe line at mouza Sukrullapur |
155000 |
Extension of water pipe line at mouza Sukrullapur1 |
Roof laid |
-
latitude : 22.00935711,22.00935317
Longitude : 87.77987088,87.77987297
file name : Image_22012022151304613.png
|
2022-01-22 15:13:04.705193 |
42 |
33999610 |
Extension of water pipe line at mouza Sukrullapur |
155000 |
Extension of water pipe line at mouza Sukrullapur1 |
Plinth level |
-
latitude : 22.00932173,22.00931724
Longitude : 87.77988653,87.7798822
file name : Image_22012022150747355.png
|
2022-01-22 15:07:47.444113 |
43 |
33999610 |
Extension of water pipe line at mouza Sukrullapur |
155000 |
Extension of water pipe line at mouza Sukrullapur1 |
Completion of work |
-
latitude : 22.00933071,22.00933064
Longitude : 87.77989942,87.77989624
file name : Image_22012022150042897.png
|
2022-01-22 15:00:43.019547 |
44 |
39111022 |
sinking of Tubewell with pump at mouza Kalaberia |
250000 |
sinking of Tubewell with pump at mouza Kalaberia1 |
Roof laid |
-
latitude : 22.05456634517759
Longitude : 87.78045443817973
file name : Image_21062021170023032.png
|
2021-06-21 17:00:23.098939 |
45 |
39111022 |
sinking of Tubewell with pump at mouza Kalaberia |
250000 |
sinking of Tubewell with pump at mouza Kalaberia1 |
Plinth level |
-
latitude : 22.05464153084904
Longitude : 87.78060330078006
file name : Image_08052021122017282.png
|
2021-05-08 12:20:17.162808 |
46 |
39111022 |
sinking of Tubewell with pump at mouza Kalaberia |
250000 |
sinking of Tubewell with pump at mouza Kalaberia1 |
Completion of work |
-
latitude : 22.054626820608974
Longitude : 87.78051051311195
file name : Image_06052021120958446.png
|
2021-05-06 12:09:58.495462 |
47 |
39111054 |
sinking of Tubewell with pump at mouza Deuribarh |
250000 |
sinking of Tubewell with pump at mouza Deuribarh1 |
Plinth level |
-
latitude : 22.021512896753848
Longitude : 87.75968994945288
file name : Image_15052021225327192.png
|
2021-05-15 22:53:27.284071 |
48 |
39111054 |
sinking of Tubewell with pump at mouza Deuribarh |
250000 |
sinking of Tubewell with pump at mouza Deuribarh1 |
Completion of work |
-
latitude : 22.02146532945335
Longitude : 87.75973420590162
file name : Image_13052021115327791.png
|
2021-05-13 11:53:27.878923 |
49 |
39110923 |
sinking of Tubewell with pump at mouza Dalbarh |
250000 |
sinking of Tubewell with pump at mouza Dalbarh1 |
Plinth level |
-
latitude : 22.04140446
Longitude : 87.78607216
file name : Image_06072021120500344.png
|
2021-07-06 12:05:00.597337 |
50 |
39110923 |
sinking of Tubewell with pump at mouza Dalbarh |
250000 |
sinking of Tubewell with pump at mouza Dalbarh1 |
Plinth level |
-
latitude : 22.04142775386572
Longitude : 87.78613971546292
file name : Image_22052021110109693.png
|
2021-05-22 11:01:09.746797 |
51 |
39110923 |
sinking of Tubewell with pump at mouza Dalbarh |
250000 |
sinking of Tubewell with pump at mouza Dalbarh1 |
Completion of work |
-
latitude : 22.041467023082078
Longitude : 87.78615564107895
file name : Image_20052021170748345.png
|
2021-05-20 17:07:48.422762 |
52 |
39110957 |
sinking of Tubewell with pump at mouza Ramchak |
250000 |
sinking of Tubewell with pump at mouza Ramchak1 |
Plinth level |
-
latitude : 22.037670356221497
Longitude : 87.77471492998302
file name : Image_10072021162744008.png
|
2021-07-10 16:27:44.063574 |
53 |
39110957 |
sinking of Tubewell with pump at mouza Ramchak |
250000 |
sinking of Tubewell with pump at mouza Ramchak1 |
Plinth level |
-
latitude : 22.037549363449216
Longitude : 87.77485339902341
file name : Image_10062021145644510.png
|
2021-06-10 14:56:44.597214 |
54 |
39110957 |
sinking of Tubewell with pump at mouza Ramchak |
250000 |
sinking of Tubewell with pump at mouza Ramchak1 |
Completion of work |
-
latitude : 22.037524972110987
Longitude : 87.77478617615998
file name : Image_30052021084416368.png
|
2021-05-30 08:44:16.463817 |
55 |
34029317 |
Sinking of Tube Well with pump at mouza Kalaberia |
250000 |
Sinking of Tube Well with pump at mouza Kalaberia1 |
Roof laid |
-
latitude : 22.05928593
Longitude : 87.78922798
file name : Image_10062021134309321.png
|
2021-06-10 13:43:09.441153 |
56 |
34029317 |
Sinking of Tube Well with pump at mouza Kalaberia |
250000 |
Sinking of Tube Well with pump at mouza Kalaberia1 |
Plinth level |
-
latitude : 22.05927924
Longitude : 87.78920307
file name : Image_10062021133306722.png
|
2021-06-10 13:33:06.831901 |
57 |
34029317 |
Sinking of Tube Well with pump at mouza Kalaberia |
250000 |
Sinking of Tube Well with pump at mouza Kalaberia1 |
Completion of work |
-
latitude : 22.05926692
Longitude : 87.78920255
file name : Image_10062021132107680.png
|
2021-06-10 13:21:07.768831 |
58 |
34011189 |
Sinking of Tube Well with Pump at mouza Nelua |
250000 |
Sinking of Tube Well with Pump at mouza Nelua1 |
Roof laid |
-
latitude : 22.032130337320268
Longitude : 87.76937297545373
file name : Image_28072021182407356.png
|
2021-07-28 18:24:07.415721 |
59 |
34011189 |
Sinking of Tube Well with Pump at mouza Nelua |
250000 |
Sinking of Tube Well with Pump at mouza Nelua1 |
Completion of work |
-
latitude : 22.03191148582846
Longitude : 87.76921103708446
file name : Image_28062021162626017.png
|
2021-06-28 16:26:26.10617 |
60 |
34015386 |
Upgradation of CC Road at Mouza Kalaberia |
300000 |
Upgradation of CC Road at Mouza Kalaberia1 |
Roof laid |
-
latitude : 22.05436151,22.05437152
Longitude : 87.78479992,87.78478905
file name : Image_18022022153235057.png
|
2022-02-18 15:32:35.182593 |
61 |
34015386 |
Upgradation of CC Road at Mouza Kalaberia |
300000 |
Upgradation of CC Road at Mouza Kalaberia1 |
Plinth level |
-
latitude : 22.05437748,22.05438389
Longitude : 87.78503593,87.78502852
file name : Image_09022022130552312.png
|
2022-02-09 13:05:52.402707 |
62 |
34015386 |
Upgradation of CC Road at Mouza Kalaberia |
300000 |
Upgradation of CC Road at Mouza Kalaberia1 |
Completion of work |
-
latitude : 22.05434281,22.0543598
Longitude : 87.78487227,87.78487893
file name : Image_09022022130000969.png
|
2022-02-09 13:00:01.106254 |
63 |
33988869 |
Upgradation of CC Road at mouza Dayalchak |
300000 |
Upgradation of CC Road at mouza Dayalchak1 |
Roof laid |
-
latitude : 22.02455715,22.02455878
Longitude : 87.75664156,87.75664175
file name : Image_18022022145832017.png
|
2022-02-18 14:58:32.144931 |
64 |
33988869 |
Upgradation of CC Road at mouza Dayalchak |
300000 |
Upgradation of CC Road at mouza Dayalchak1 |
Plinth level |
-
latitude : 22.02445812,22.02445437
Longitude : 87.75694101,87.75694332
file name : Image_12022022123255793.png
|
2022-02-12 12:32:55.907464 |
65 |
33988869 |
Upgradation of CC Road at mouza Dayalchak |
300000 |
Upgradation of CC Road at mouza Dayalchak1 |
Completion of work |
-
latitude : 22.02449289,22.02449182
Longitude : 87.75639625,87.75639655
file name : Image_12022022122303356.png
|
2022-02-12 12:23:03.459413 |
66 |
49138032 |
WATER PIPELINE FROM GOBARDHAN MAITY TO SANKAR MAITY AT KOTEBARH |
50000 |
WATER PIPELINE FROM GOBARDHAN MAITY TO SANKAR MAITY AT KOTEBARH1 |
Roof laid |
-
latitude : 22.05555135,22.05555213
Longitude : 87.77901116,87.7790095
file name : Image_11022022183850861.png
|
2022-02-11 18:38:50.955209 |
67 |
49138032 |
WATER PIPELINE FROM GOBARDHAN MAITY TO SANKAR MAITY AT KOTEBARH |
50000 |
WATER PIPELINE FROM GOBARDHAN MAITY TO SANKAR MAITY AT KOTEBARH1 |
Plinth level |
-
latitude : 22.05554348,22.05554346
Longitude : 87.77903637,87.77903587
file name : Image_11022022182819904.png
|
2022-02-11 18:28:20.001677 |
68 |
49138032 |
WATER PIPELINE FROM GOBARDHAN MAITY TO SANKAR MAITY AT KOTEBARH |
50000 |
WATER PIPELINE FROM GOBARDHAN MAITY TO SANKAR MAITY AT KOTEBARH1 |
Completion of work |
-
latitude : 22.05552363,22.05552371
Longitude : 87.77894794,87.77894818
file name : Image_11022022181909258.png
|
2022-02-11 18:19:09.339875 |
69 |
39111070 |
sinking of Tubewell with pump mouza Purba Radhapur |
250000 |
sinking of Tubewell with pump mouza Purba Radhapur1 |
Plinth level |
-
latitude : 22.02158648
Longitude : 87.74890828
file name : Image_23122021123101282.png
|
2021-12-23 12:31:01.379789 |
70 |
39111070 |
sinking of Tubewell with pump mouza Purba Radhapur |
250000 |
sinking of Tubewell with pump mouza Purba Radhapur1 |
Completion of work |
-
latitude : 22.02155525
Longitude : 87.74887126
file name : Image_23122021122140741.png
|
2021-12-23 12:21:40.89285 |
71 |
34000497 |
Upgradation of CC Road at mouza Shukrullapur |
300000 |
Upgradation of CC Road at mouza Shukrullapur1 |
Roof laid |
-
latitude : 22.010121680796146,22.010117070749402
Longitude : 87.76299795135856,87.76302888058126
file name : Image_22022022163610787.png
|
2022-02-22 16:36:10.885372 |
72 |
34000497 |
Upgradation of CC Road at mouza Shukrullapur |
300000 |
Upgradation of CC Road at mouza Shukrullapur1 |
Plinth level |
-
latitude : 22.010110071860254,22.010091044940054
Longitude : 87.76302619837224,87.76302628219128
file name : Image_20022022165658399.png
|
2022-02-20 16:56:58.492933 |
73 |
34000497 |
Upgradation of CC Road at mouza Shukrullapur |
300000 |
Upgradation of CC Road at mouza Shukrullapur1 |
Completion of work |
-
latitude : 22.010604,22.0106043
Longitude : 87.7629533,87.7629605
file name : Image_19022022100424456.png
|
2022-02-19 10:04:24.51465 |
74 |
33996319 |
Const of wooden bridge near P Radhapur Pry School |
300000 |
Const of wooden bridge near P Radhapur Pry School1 |
Roof laid |
-
latitude : 22.02598383
Longitude : 87.74622464
file name : Image_02042022123120350.png
|
2022-04-02 12:31:20.452094 |
75 |
33996319 |
Const of wooden bridge near P Radhapur Pry School |
300000 |
Const of wooden bridge near P Radhapur Pry School1 |
Plinth level |
-
latitude : 22.02595679
Longitude : 87.74614408
file name : Image_02042022122324218.png
|
2022-04-02 12:23:24.347368 |
76 |
33996319 |
Const of wooden bridge near P Radhapur Pry School |
300000 |
Const of wooden bridge near P Radhapur Pry School1 |
Completion of work |
-
latitude : 22.0201429
Longitude : 87.7484992
file name : Image_02042022121713212.png
|
2022-04-02 12:17:13.339065 |
77 |
49139176 |
water pipeline from takhur mandir torabi maity shop |
100000 |
water pipeline from takhur mandir torabi maity shop1 |
Roof laid |
-
latitude : 22.03063874,22.03063611
Longitude : 87.7657761,87.76577898
file name : Image_22022022134420186.png
|
2022-02-22 13:44:20.296742 |
78 |
49139176 |
water pipeline from takhur mandir torabi maity shop |
100000 |
water pipeline from takhur mandir torabi maity shop1 |
Plinth level |
-
latitude : 22.03065267,22.03065572
Longitude : 87.7656746,87.76568247
file name : Image_22022022134117858.png
|
2022-02-22 13:41:17.974943 |
79 |
49139176 |
water pipeline from takhur mandir torabi maity shop |
100000 |
water pipeline from takhur mandir torabi maity shop1 |
Completion of work |
-
latitude : 22.03059759,22.03060356
Longitude : 87.76576042,87.76575856
file name : Image_22022022133707400.png
|
2022-02-22 13:37:07.578209 |
80 |
34021692 |
Upgradation of CC Road at Mouza Su-Charabarh |
300000 |
Upgradation of CC Road at Mouza Su-Charabarh1 |
Roof laid |
-
latitude : 22.05535896,22.05535163
Longitude : 87.7725237,87.77252111
file name : Image_22022022140324168.png
|
2022-02-22 14:03:24.262309 |
81 |
34021692 |
Upgradation of CC Road at Mouza Su-Charabarh |
300000 |
Upgradation of CC Road at Mouza Su-Charabarh1 |
Plinth level |
-
latitude : 22.05535554,22.05535837
Longitude : 87.77248245,87.77248818
file name : Image_22022022140003369.png
|
2022-02-22 14:00:03.49572 |
82 |
34021692 |
Upgradation of CC Road at Mouza Su-Charabarh |
300000 |
Upgradation of CC Road at Mouza Su-Charabarh1 |
Completion of work |
-
latitude : 22.05543576,22.05541044
Longitude : 87.77221605,87.77221021
file name : Image_22022022135555743.png
|
2022-02-22 13:55:55.886415 |
83 |
33980385 |
Upgradation of Concrete Road at Mouza Dwarikachak |
300000 |
Upgradation of Concrete Road at Mouza Dwarikachak1 |
Plinth level |
-
latitude : 22.04646725,22.04644868
Longitude : 87.75172102,87.75173602
file name : Image_24012022135651056.png
|
2022-01-24 13:56:51.17014 |
84 |
33980385 |
Upgradation of Concrete Road at Mouza Dwarikachak |
300000 |
Upgradation of Concrete Road at Mouza Dwarikachak1 |
Completion of work |
-
latitude : 22.04685265,22.04686857
Longitude : 87.75163168,87.75163283
file name : Image_22012022134139862.png
|
2022-01-22 13:41:39.992182 |
85 |
33987298 |
Upgradation of Concrete Road at Mouza Manoharpur |
300000 |
Upgradation of Concrete Road at Mouza Manoharpur1 |
Plinth level |
-
latitude : 22.03764358,22.03765489
Longitude : 87.7476319,87.74761926
file name : Image_22012022124405812.png
|
2022-01-22 12:44:05.930023 |
86 |
33987298 |
Upgradation of Concrete Road at Mouza Manoharpur |
300000 |
Upgradation of Concrete Road at Mouza Manoharpur1 |
Completion of work |
-
latitude : 22.037231,22.03723362
Longitude : 87.74724497,87.74723882
file name : Image_22012022123745120.png
|
2022-01-22 12:37:45.254442 |
87 |
34025123 |
Upgradation of CC Road at mouza Shyamchak |
300000 |
Upgradation of CC Road at mouza Shyamchak1 |
Roof laid |
-
latitude : 22.05806113,22.0580581
Longitude : 87.75441276,87.75439887
file name : Image_28012022124715157.png
|
2022-01-28 12:47:15.272554 |
88 |
34025123 |
Upgradation of CC Road at mouza Shyamchak |
300000 |
Upgradation of CC Road at mouza Shyamchak1 |
Plinth level |
-
latitude : 22.05796258,22.05796056
Longitude : 87.75477574,87.75477759
file name : Image_27012022120201265.png
|
2022-01-27 12:02:01.395947 |
89 |
34025123 |
Upgradation of CC Road at mouza Shyamchak |
300000 |
Upgradation of CC Road at mouza Shyamchak1 |
Completion of work |
-
latitude : 22.05800648,22.05800187
Longitude : 87.75511921,87.75511471
file name : Image_27012022114951915.png
|
2022-01-27 11:49:52.051675 |
90 |
33995590 |
Upgradation of CC Road at Mouza Kotebarh |
300000 |
Upgradation of CC Road at Mouza Kotebarh1 |
Roof laid |
-
latitude : 22.050090031698346,22.049746038392186
Longitude : 87.78113353997469,87.78073699213564
file name : Image_07022022135543892.png
|
2022-02-07 13:55:43.963773 |
91 |
33995590 |
Upgradation of CC Road at Mouza Kotebarh |
300000 |
Upgradation of CC Road at Mouza Kotebarh1 |
Plinth level |
-
latitude : 22.05012984573841,22.05014208331704
Longitude : 87.78112054802477,87.78115902096033
file name : Image_07022022134936685.png
|
2022-02-07 13:49:36.752125 |
92 |
33995590 |
Upgradation of CC Road at Mouza Kotebarh |
300000 |
Upgradation of CC Road at Mouza Kotebarh1 |
Completion of work |
-
latitude : 22.050072555430233,22.050072555430233
Longitude : 87.78116379864514,87.78116379864514
file name : Image_07022022134458587.png
|
2022-02-07 13:44:58.670757 |
93 |
34009678 |
Upgradation of CC Road at Mouza Deuribarh |
300000 |
Upgradation of CC Road at Mouza Deuribarh1 |
Roof laid |
-
latitude : 22.01648434,22.01649247
Longitude : 87.76636381,87.76637013
file name : Image_24022022150636325.png
|
2022-02-24 15:06:36.413075 |
94 |
34009678 |
Upgradation of CC Road at Mouza Deuribarh |
300000 |
Upgradation of CC Road at Mouza Deuribarh1 |
Plinth level |
-
latitude : 22.0161582,22.01615228
Longitude : 87.76638306,87.7663813
file name : Image_15022022134909785.png
|
2022-02-15 13:49:09.8842 |
95 |
34009678 |
Upgradation of CC Road at Mouza Deuribarh |
300000 |
Upgradation of CC Road at Mouza Deuribarh1 |
Completion of work |
-
latitude : 22.01648979,22.01648991
Longitude : 87.7663675,87.76637091
file name : Image_15022022133713153.png
|
2022-02-15 13:37:13.258389 |
96 |
33988237 |
Upgradation of CC Road at mouza PurbaRadhapur |
300000 |
Upgradation of CC Road at mouza PurbaRadhapur1 |
Roof laid |
-
latitude : 22.029681,22.02968164
Longitude : 87.74883582,87.74883736
file name : Image_24022022141744782.png
|
2022-02-24 14:17:44.876781 |
97 |
33988237 |
Upgradation of CC Road at mouza PurbaRadhapur |
300000 |
Upgradation of CC Road at mouza PurbaRadhapur1 |
Plinth level |
-
latitude : 22.02975639,22.02976362
Longitude : 87.74885924,87.74886287
file name : Image_24022022141136665.png
|
2022-02-24 14:11:36.776307 |
98 |
33988237 |
Upgradation of CC Road at mouza PurbaRadhapur |
300000 |
Upgradation of CC Road at mouza PurbaRadhapur1 |
Completion of work |
-
latitude : 22.03041025,22.03040691
Longitude : 87.74891449,87.74892243
file name : Image_24022022140043162.png
|
2022-02-24 14:00:43.291441 |
99 |
34003623 |
Upgradation of CC Road at mouza Chowdunia |
300000 |
Upgradation of CC Road at mouza Chowdunia1 |
Roof laid |
-
latitude : 22.036194428801537,22.036192542873323
Longitude : 87.78203786350787,87.78205412440002
file name : Image_29012022160116147.png
|
2022-01-29 16:01:16.258973 |
100 |
34003623 |
Upgradation of CC Road at mouza Chowdunia |
300000 |
Upgradation of CC Road at mouza Chowdunia1 |
Plinth level |
-
latitude : 22.036131187342107,22.036109981127083
Longitude : 87.781987991184,87.78197114355862
file name : Image_21012022134147068.png
|
2022-01-21 13:41:47.160278 |
101 |
34003623 |
Upgradation of CC Road at mouza Chowdunia |
300000 |
Upgradation of CC Road at mouza Chowdunia1 |
Completion of work |
-
latitude : 22.035827385261655,22.035706476308405
Longitude : 87.78194155544043,87.78191548772156
file name : Image_11012022131254659.png
|
2022-01-11 13:12:54.735791 |
102 |
34008812 |
Upgradation of CC Road at mouza Kotebarh |
300000 |
Upgradation of CC Road at mouza Kotebarh1 |
Roof laid |
-
latitude : 22.04496539,22.04494717
Longitude : 87.78199621,87.78199317
file name : Image_16022022124613592.png
|
2022-02-16 12:46:13.69857 |
103 |
34008812 |
Upgradation of CC Road at mouza Kotebarh |
300000 |
Upgradation of CC Road at mouza Kotebarh1 |
Plinth level |
-
latitude : 22.04516046,22.04515642
Longitude : 87.78177421,87.78178622
file name : Image_11022022121912607.png
|
2022-02-11 12:19:12.827203 |
104 |
34008812 |
Upgradation of CC Road at mouza Kotebarh |
300000 |
Upgradation of CC Road at mouza Kotebarh1 |
Completion of work |
-
latitude : 22.04557516,22.04559468
Longitude : 87.7814121,87.78138171
file name : Image_28012022154013231.png
|
2022-01-28 15:40:13.22921 |
105 |
34014308 |
Upgradation of CC Road at mouza Kalaberia |
300000 |
Upgradation of CC Road at mouza Kalaberia1 |
Roof laid |
-
latitude : 22.05817099,22.05817345
Longitude : 87.7923938,87.79239555
file name : Image_25012022124733279.png
|
2022-01-25 12:47:33.401336 |
106 |
34014308 |
Upgradation of CC Road at mouza Kalaberia |
300000 |
Upgradation of CC Road at mouza Kalaberia1 |
Plinth level |
-
latitude : 22.05809797,22.05809562
Longitude : 87.79235965,87.79237138
file name : Image_25012022123938193.png
|
2022-01-25 12:39:38.326145 |
107 |
34014308 |
Upgradation of CC Road at mouza Kalaberia |
300000 |
Upgradation of CC Road at mouza Kalaberia1 |
Completion of work |
-
latitude : 22.05812851,22.05812278
Longitude : 87.79230592,87.79228373
file name : Image_25012022122908381.png
|
2022-01-25 12:29:08.485927 |
108 |
34016680 |
Upgradation of CC Road at Bhu-Charabarh |
300000 |
Upgradation of CC Road at Bhu-Charabarh1 |
Roof laid |
-
latitude : 22.06063867,22.06063944
Longitude : 87.77839286,87.77839164
file name : Image_11022022140648149.png
|
2022-02-11 14:06:48.228853 |
109 |
34016680 |
Upgradation of CC Road at Bhu-Charabarh |
300000 |
Upgradation of CC Road at Bhu-Charabarh1 |
Plinth level |
-
latitude : 22.0605867,22.06058804
Longitude : 87.77872317,87.77872389
file name : Image_28012022115902799.png
|
2022-01-28 11:59:02.93177 |
110 |
34016680 |
Upgradation of CC Road at Bhu-Charabarh |
300000 |
Upgradation of CC Road at Bhu-Charabarh1 |
Completion of work |
-
latitude : 22.06052888,22.06054385
Longitude : 87.77893395,87.77893618
file name : Image_27012022113342624.png
|
2022-01-27 11:33:42.736271 |
111 |
34011804 |
Sinking of Tube Well with Pump at mouza Nelua |
250000 |
Sinking of Tube Well with Pump at mouza Nelua1 |
Completion of work |
-
latitude : 22.02627308
Longitude : 87.76846799
file name : Image_04012022115618744.png
|
2022-01-04 11:56:18.873044 |
112 |
33999078 |
Upgradation of CC Road at Mouza Kotebarh |
300000 |
Upgradation of CC Road at Mouza Kotebarh1 |
Roof laid |
-
latitude : 22.05004613,22.05002668
Longitude : 87.77264585,87.77261061
file name : Image_04012022111843011.png
|
2022-01-04 11:18:43.114657 |
113 |
33999078 |
Upgradation of CC Road at Mouza Kotebarh |
300000 |
Upgradation of CC Road at Mouza Kotebarh1 |
Plinth level |
-
latitude : 22.04948435,22.04947472
Longitude : 87.77233699,87.77233943
file name : Image_31122021121336688.png
|
2021-12-31 12:13:36.80147 |
114 |
33999078 |
Upgradation of CC Road at Mouza Kotebarh |
300000 |
Upgradation of CC Road at Mouza Kotebarh1 |
Completion of work |
-
latitude : 22.04936952,22.04937352
Longitude : 87.77222641,87.77225451
file name : Image_29122021115233436.png
|
2021-12-29 11:52:33.605234 |
115 |
49139099 |
water pipeline from kakali das to ananta samant at ramchak |
100000 |
water pipeline from kakali das to ananta samant at ramchak1 |
Roof laid |
-
latitude : 22.03491955,22.03492338
Longitude : 87.76864118,87.76865292
file name : Image_03032022145047423.png
|
2022-03-03 14:50:47.535694 |
116 |
49139099 |
water pipeline from kakali das to ananta samant at ramchak |
100000 |
water pipeline from kakali das to ananta samant at ramchak1 |
Plinth level |
-
latitude : 22.03494184,22.03493934
Longitude : 87.76870455,87.76870861
file name : Image_03032022144438470.png
|
2022-03-03 14:44:38.576337 |
117 |
49139099 |
water pipeline from kakali das to ananta samant at ramchak |
100000 |
water pipeline from kakali das to ananta samant at ramchak1 |
Completion of work |
-
latitude : 22.03490088,22.03489171
Longitude : 87.76864562,87.76865344
file name : Image_03032022143452687.png
|
2022-03-03 14:34:52.787394 |
118 |
33997882 |
Upgradation of CC Road at mouza Bhairabichak |
300000 |
Upgradation of CC Road at mouza Bhairabichak1 |
Roof laid |
-
latitude : 22.0267381,22.0267389
Longitude : 87.7813686,87.7813638
file name : Image_02022022112027965.png
|
2022-02-02 11:20:28.037577 |
119 |
33997882 |
Upgradation of CC Road at mouza Bhairabichak |
300000 |
Upgradation of CC Road at mouza Bhairabichak1 |
Plinth level |
-
latitude : 22.02646347,22.02645648
Longitude : 87.78112268,87.7811152
file name : Image_01022022134147000.png
|
2022-02-01 13:41:47.133331 |
120 |
33997882 |
Upgradation of CC Road at mouza Bhairabichak |
300000 |
Upgradation of CC Road at mouza Bhairabichak1 |
Completion of work |
-
latitude : 22.0267277,22.0267265
Longitude : 87.7813719,87.7813698
file name : Image_31012022103650889.png
|
2022-01-31 10:36:50.969881 |
121 |
34013822 |
Extension of Water Pipe line at mouza Nelua |
100000 |
Extension of Water Pipe line at mouza Nelua1 |
Roof laid |
-
latitude : 22.02135893,22.02136145
Longitude : 87.76572234,87.76572005
file name : Image_22022022133015067.png
|
2022-02-22 13:30:15.173647 |
122 |
34013822 |
Extension of Water Pipe line at mouza Nelua |
100000 |
Extension of Water Pipe line at mouza Nelua1 |
Plinth level |
-
latitude : 22.02134814,22.02134907
Longitude : 87.76568998,87.76569667
file name : Image_22022022132455866.png
|
2022-02-22 13:24:55.974501 |
123 |
34013822 |
Extension of Water Pipe line at mouza Nelua |
100000 |
Extension of Water Pipe line at mouza Nelua1 |
Completion of work |
-
latitude : 22.02135133,22.02134198
Longitude : 87.76573472,87.76574608
file name : Image_22022022132040832.png
|
2022-02-22 13:20:40.939934 |
124 |
34013045 |
Extension of Water Pipe line at mouza Nelua |
100000 |
Extension of Water Pipe line at mouza Nelua1 |
Roof laid |
-
latitude : 22.02041467,22.0204112
Longitude : 87.77055514,87.77055175
file name : Image_22022022131441919.png
|
2022-02-22 13:14:42.017389 |
125 |
34013045 |
Extension of Water Pipe line at mouza Nelua |
100000 |
Extension of Water Pipe line at mouza Nelua1 |
Plinth level |
-
latitude : 22.02043972,22.02043276
Longitude : 87.77050769,87.77050342
file name : Image_22022022131117617.png
|
2022-02-22 13:11:17.711244 |
126 |
34013045 |
Extension of Water Pipe line at mouza Nelua |
100000 |
Extension of Water Pipe line at mouza Nelua1 |
Completion of work |
-
latitude : 22.02041327,22.02041882
Longitude : 87.7705345,87.7705468
file name : Image_22022022130712269.png
|
2022-02-22 13:07:12.361011 |
127 |
34011313 |
Upgradation of CC Road at mouza Kalaberia |
300000 |
Upgradation of CC Road at mouza Kalaberia1 |
Roof laid |
-
latitude : 22.05410886090249,22.054019928909838
Longitude : 87.78643023222685,87.78628807514906
file name : Image_06022022100237684.png
|
2022-02-06 10:02:37.745737 |
128 |
34011313 |
Upgradation of CC Road at mouza Kalaberia |
300000 |
Upgradation of CC Road at mouza Kalaberia1 |
Plinth level |
-
latitude : 22.05384916,22.0538932
Longitude : 87.78626425,87.786085
file name : Image_31012022115332673.png
|
2022-01-31 11:53:32.793438 |
129 |
34011313 |
Upgradation of CC Road at mouza Kalaberia |
300000 |
Upgradation of CC Road at mouza Kalaberia1 |
Completion of work |
-
latitude : 22.0536577,22.0538438
Longitude : 87.7858507,87.7860427
file name : Image_30012022111803879.png
|
2022-01-30 11:18:03.951273 |
130 |
49121923 |
PIPELINE FROM SUBODH DAS TO MADAN DAS AT SHYAMCHAK |
50000 |
PIPELINE FROM SUBODH DAS TO MADAN DAS AT SHYAMCHAK1 |
Roof laid |
-
latitude : 22.05187582,22.05187706
Longitude : 87.76068373,87.76068378
file name : Image_04032022145741717.png
|
2022-03-04 14:57:41.911648 |
131 |
49121923 |
PIPELINE FROM SUBODH DAS TO MADAN DAS AT SHYAMCHAK |
50000 |
PIPELINE FROM SUBODH DAS TO MADAN DAS AT SHYAMCHAK1 |
Plinth level |
-
latitude : 22.05187987,22.05189614
Longitude : 87.76064422,87.76065715
file name : Image_04032022145028374.png
|
2022-03-04 14:50:28.49231 |
132 |
49121923 |
PIPELINE FROM SUBODH DAS TO MADAN DAS AT SHYAMCHAK |
50000 |
PIPELINE FROM SUBODH DAS TO MADAN DAS AT SHYAMCHAK1 |
Completion of work |
-
latitude : 22.05188728,22.05188785
Longitude : 87.76071665,87.76072604
file name : Image_04032022144143118.png
|
2022-03-04 14:41:43.233513 |
133 |
49122565 |
PIPELINE FROM SUSANTA PRADHAN TO GOURHARI KUMAR AT SHYAMCHAK |
30000 |
PIPELINE FROM SUSANTA PRADHAN TO GOURHARI KUMAR AT SHYAMCHAK1 |
Roof laid |
-
latitude : 22.05310089,22.05310243
Longitude : 87.75697497,87.75697078
file name : Image_04032022151643885.png
|
2022-03-04 15:16:43.979577 |
134 |
49122565 |
PIPELINE FROM SUSANTA PRADHAN TO GOURHARI KUMAR AT SHYAMCHAK |
30000 |
PIPELINE FROM SUSANTA PRADHAN TO GOURHARI KUMAR AT SHYAMCHAK1 |
Plinth level |
-
latitude : 22.05312836,22.05314524
Longitude : 87.75699189,87.75698879
file name : Image_04032022150824214.png
|
2022-03-04 15:08:24.339615 |
135 |
49122565 |
PIPELINE FROM SUSANTA PRADHAN TO GOURHARI KUMAR AT SHYAMCHAK |
30000 |
PIPELINE FROM SUSANTA PRADHAN TO GOURHARI KUMAR AT SHYAMCHAK1 |
Completion of work |
-
latitude : 22.05313116,22.05313224
Longitude : 87.75696578,87.75697693
file name : Image_04032022150152514.png
|
2022-03-04 15:01:52.60012 |
136 |
49121545 |
WATER PIPELINE FROM HARIPADA DAS TO SUDHANSHU PATRA |
60000 |
WATER PIPELINE FROM HARIPADA DAS TO SUDHANSHU PATRA1 |
Roof laid |
-
latitude : 22.05413438,22.05413258
Longitude : 87.75385566,87.753856
file name : Image_04032022153152456.png
|
2022-03-04 15:31:52.560973 |
137 |
49121545 |
WATER PIPELINE FROM HARIPADA DAS TO SUDHANSHU PATRA |
60000 |
WATER PIPELINE FROM HARIPADA DAS TO SUDHANSHU PATRA1 |
Plinth level |
-
latitude : 22.05410143,22.05410167
Longitude : 87.75391136,87.75391697
file name : Image_04032022152734748.png
|
2022-03-04 15:27:34.851285 |
138 |
49121545 |
WATER PIPELINE FROM HARIPADA DAS TO SUDHANSHU PATRA |
60000 |
WATER PIPELINE FROM HARIPADA DAS TO SUDHANSHU PATRA1 |
Completion of work |
-
latitude : 22.05407921,22.05409265
Longitude : 87.75385677,87.75387579
file name : Image_04032022152251203.png
|
2022-03-04 15:22:51.3097 |
139 |
49123460 |
PIPELINRE AT MOUZA SHYAMCHAK FROM PARESH CH MAITY TO SIBSANKAR PATRA |
50000 |
PIPELINRE AT MOUZA SHYAMCHAK FROM PARESH CH MAITY TO SIBSANKAR PATRA1 |
Roof laid |
-
latitude : 22.05829342,22.05829663
Longitude : 87.75577141,87.75577174
file name : Image_04032022154811383.png
|
2022-03-04 15:48:11.496511 |
140 |
49123460 |
PIPELINRE AT MOUZA SHYAMCHAK FROM PARESH CH MAITY TO SIBSANKAR PATRA |
50000 |
PIPELINRE AT MOUZA SHYAMCHAK FROM PARESH CH MAITY TO SIBSANKAR PATRA1 |
Plinth level |
-
latitude : 22.05832171,22.05831741
Longitude : 87.7557595,87.75577718
file name : Image_04032022154217043.png
|
2022-03-04 15:42:17.152453 |
141 |
49123460 |
PIPELINRE AT MOUZA SHYAMCHAK FROM PARESH CH MAITY TO SIBSANKAR PATRA |
50000 |
PIPELINRE AT MOUZA SHYAMCHAK FROM PARESH CH MAITY TO SIBSANKAR PATRA1 |
Completion of work |
-
latitude : 22.05828935,22.05829331
Longitude : 87.7557845,87.7557725
file name : Image_04032022153728237.png
|
2022-03-04 15:37:28.378215 |
142 |
49137584 |
TUBEWELL NEAR THE HOUSE OF KAMAL GIRI AT DEURIBARH |
200000 |
TUBEWELL NEAR THE HOUSE OF KAMAL GIRI AT DEURIBARH1 |
Roof laid |
-
latitude : 22.0133347
Longitude : 87.75682789
file name : Image_25032022181514050.png
|
2022-03-25 18:15:14.156386 |
143 |
49137584 |
TUBEWELL NEAR THE HOUSE OF KAMAL GIRI AT DEURIBARH |
200000 |
TUBEWELL NEAR THE HOUSE OF KAMAL GIRI AT DEURIBARH1 |
Plinth level |
-
latitude : 22.01326843
Longitude : 87.75688076
file name : Image_03032022135638766.png
|
2022-03-03 13:56:38.885586 |
144 |
49137584 |
TUBEWELL NEAR THE HOUSE OF KAMAL GIRI AT DEURIBARH |
200000 |
TUBEWELL NEAR THE HOUSE OF KAMAL GIRI AT DEURIBARH1 |
Completion of work |
-
latitude : 22.01319586
Longitude : 87.75693673
file name : Image_03032022134547031.png
|
2022-03-03 13:45:47.161224 |
145 |
49137976 |
WATER DRAINAGE FROM HARA MAHAMMAD TO HABIBUR MALLIK AT KOTEBARH |
300000 |
WATER DRAINAGE FROM HARA MAHAMMAD TO HABIBUR MALLIK AT KOTEBARH1 |
Roof laid |
-
latitude : 22.04519189,22.04518208
Longitude : 87.78577077,87.78576089
file name : Image_25032022120443681.png
|
2022-03-25 12:04:43.765906 |
146 |
49137976 |
WATER DRAINAGE FROM HARA MAHAMMAD TO HABIBUR MALLIK AT KOTEBARH |
300000 |
WATER DRAINAGE FROM HARA MAHAMMAD TO HABIBUR MALLIK AT KOTEBARH1 |
Plinth level |
-
latitude : 22.04543127,22.04544185
Longitude : 87.78568956,87.78569757
file name : Image_25032022115619746.png
|
2022-03-25 11:56:19.862445 |
147 |
49137976 |
WATER DRAINAGE FROM HARA MAHAMMAD TO HABIBUR MALLIK AT KOTEBARH |
300000 |
WATER DRAINAGE FROM HARA MAHAMMAD TO HABIBUR MALLIK AT KOTEBARH1 |
Completion of work |
-
latitude : 22.04553527,22.04553053
Longitude : 87.78564782,87.78564986
file name : Image_25032022114936478.png
|
2022-03-25 11:49:36.595084 |
148 |
49124244 |
TUBEWELL NEAR THE HOUSE OF TAPAS KUMAR GIRI AT MOUZA GUMKIA |
200000 |
TUBEWELL NEAR THE HOUSE OF TAPAS KUMAR GIRI AT MOUZA GUMKIA1 |
Plinth level |
-
latitude : 22.06444761
Longitude : 87.75312975
file name : Image_01042022151034299.png
|
2022-04-01 15:10:34.397086 |
149 |
49124244 |
TUBEWELL NEAR THE HOUSE OF TAPAS KUMAR GIRI AT MOUZA GUMKIA |
200000 |
TUBEWELL NEAR THE HOUSE OF TAPAS KUMAR GIRI AT MOUZA GUMKIA1 |
Completion of work |
-
latitude : 22.06442991
Longitude : 87.75315583
file name : Image_01042022150629980.png
|
2022-04-01 15:06:30.063906 |
150 |
49139270 |
tubewell with pipeline near sukumar manna at dwarikachak |
250000 |
tubewell with pipeline near sukumar manna at dwarikachak1 |
Plinth level |
-
latitude : 22.045883333333336
Longitude : 87.75185833333335
file name : Image_11052022144708288.png
|
2022-05-11 14:47:08.405765 |
151 |
49139270 |
tubewell with pipeline near sukumar manna at dwarikachak |
250000 |
tubewell with pipeline near sukumar manna at dwarikachak1 |
Plinth level |
-
latitude : 22.04590366
Longitude : 87.75187525
file name : Image_04042022125225461.png
|
2022-04-04 12:52:25.589589 |
152 |
49139270 |
tubewell with pipeline near sukumar manna at dwarikachak |
250000 |
tubewell with pipeline near sukumar manna at dwarikachak1 |
Completion of work |
-
latitude : 22.04594703
Longitude : 87.75189808
file name : Image_04042022124555442.png
|
2022-04-04 12:45:55.598291 |
153 |
47460650 |
Upgradation of concrete road at mouza Bhu Charabarh from the H/o Bhimcharan Gorai to the H/o Jhantu |
300000 |
Upgradation of concrete road at mouza Bhu Charabarh from the H/o Bhimcharan Gorai to the H/o Jhantu 1 |
Plinth level |
-
latitude : 22.06074752,22.06076673
Longitude : 87.7792593,87.77923673
file name : Image_08042022123659598.png
|
2022-04-08 12:36:59.707912 |
154 |
47460650 |
Upgradation of concrete road at mouza Bhu Charabarh from the H/o Bhimcharan Gorai to the H/o Jhantu |
300000 |
Upgradation of concrete road at mouza Bhu Charabarh from the H/o Bhimcharan Gorai to the H/o Jhantu 1 |
Completion of work |
-
latitude : 22.06061676,22.06063466
Longitude : 87.77905878,87.77902864
file name : Image_08042022123202504.png
|
2022-04-08 12:32:02.630314 |
155 |
49124941 |
CC COVERED DRAIN FROM SK RAHADUL TEA SHOP TO THE ISLAM KHA |
290000 |
CC COVERED DRAIN FROM SK RAHADUL TEA SHOP TO THE ISLAM KHA1 |
Roof laid |
-
latitude : 22.04713666,22.04712279
Longitude : 87.77826173,87.77825493
file name : Image_13042022115905830.png
|
2022-04-13 11:59:05.940418 |
156 |
49124941 |
CC COVERED DRAIN FROM SK RAHADUL TEA SHOP TO THE ISLAM KHA |
290000 |
CC COVERED DRAIN FROM SK RAHADUL TEA SHOP TO THE ISLAM KHA1 |
Plinth level |
-
latitude : 22.0468808,22.04713457
Longitude : 87.7783518,87.77828809
file name : Image_13042022114938738.png
|
2022-04-13 11:49:38.888649 |
157 |
49124941 |
CC COVERED DRAIN FROM SK RAHADUL TEA SHOP TO THE ISLAM KHA |
290000 |
CC COVERED DRAIN FROM SK RAHADUL TEA SHOP TO THE ISLAM KHA1 |
Completion of work |
-
latitude : 22.0469636,22.0469571
Longitude : 87.778555,87.7785524
file name : Image_13042022113711384.png
|
2022-04-13 11:37:11.496573 |
158 |
56869818 |
ROAD REPAIR AT MOUZA SHYAMCHAK FROM THE HO KRISHNA GOPAL DAS TO THE HO SANTOSH DAS |
182139 |
ROAD REPAIR AT MOUZA SHYAMCHAK FROM THE HO KRISHNA GOPAL DAS TO THE HO SANTOSH DAS1 |
Roof laid |
-
latitude : 22.05348427,22.05346795
Longitude : 87.75596823,87.75596907
file name : Image_27122023170457725.png
|
2023-12-27 17:04:57.79768 |
159 |
56869818 |
ROAD REPAIR AT MOUZA SHYAMCHAK FROM THE HO KRISHNA GOPAL DAS TO THE HO SANTOSH DAS |
182139 |
ROAD REPAIR AT MOUZA SHYAMCHAK FROM THE HO KRISHNA GOPAL DAS TO THE HO SANTOSH DAS1 |
Plinth level |
-
latitude : 22.05353181,22.05350902
Longitude : 87.7560068,87.75598043
file name : Image_27122023170150863.png
|
2023-12-27 17:01:50.933019 |
160 |
56869818 |
ROAD REPAIR AT MOUZA SHYAMCHAK FROM THE HO KRISHNA GOPAL DAS TO THE HO SANTOSH DAS |
182139 |
ROAD REPAIR AT MOUZA SHYAMCHAK FROM THE HO KRISHNA GOPAL DAS TO THE HO SANTOSH DAS1 |
Completion of work |
-
latitude : 22.05339146,22.05343582
Longitude : 87.75593965,87.75596414
file name : Image_27122023165837473.png
|
2023-12-27 16:58:37.555092 |
161 |
34027253 |
Sinking of Tube Well with Pump at mouza Kotebarh |
200000 |
Sinking of Tube Well with Pump at mouza Kotebarh1 |
Plinth level |
-
latitude : 22.051315
Longitude : 87.77884
file name : Image_10052022122619048.png
|
2022-05-10 12:26:19.155656 |
162 |
34027253 |
Sinking of Tube Well with Pump at mouza Kotebarh |
200000 |
Sinking of Tube Well with Pump at mouza Kotebarh1 |
Roof laid |
-
latitude : 22.051309999999997
Longitude : 87.77886333333332
file name : Image_10052022123059700.png
|
2022-05-10 12:30:59.811765 |
163 |
34027253 |
Sinking of Tube Well with Pump at mouza Kotebarh |
200000 |
Sinking of Tube Well with Pump at mouza Kotebarh1 |
Completion of work |
-
latitude : 22.051348333333333
Longitude : 87.77882833333334
file name : Image_10052022122120713.png
|
2022-05-10 12:21:20.823739 |
164 |
34027253 |
Sinking of Tube Well with Pump at mouza Kotebarh |
200000 |
Sinking of Tube Well with Pump at mouza Kotebarh1 |
Completion of work |
-
latitude : 22.05133283
Longitude : 87.77898875
file name : Image_04042022115103874.png
|
2022-04-04 11:51:04.016503 |
165 |
34027253 |
Sinking of Tube Well with Pump at mouza Kotebarh |
200000 |
Sinking of Tube Well with Pump at mouza Kotebarh1 |
Completion of work |
-
latitude : 22.05133283
Longitude : 87.77898875
file name : Image_04042022124234054.png
|
2022-04-04 12:42:34.196812 |
166 |
49135034 |
TUBEWELL NEAR THE HOIUSE OF JAGANNATH PRADHAN AT NELUA |
200000 |
TUBEWELL NEAR THE HOIUSE OF JAGANNATH PRADHAN AT NELUA1 |
Roof laid |
-
latitude : 22.023333333333333
Longitude : 87.76945666666667
file name : Image_09052022154856931.png
|
2022-05-09 15:48:57.031717 |
167 |
49135034 |
TUBEWELL NEAR THE HOIUSE OF JAGANNATH PRADHAN AT NELUA |
200000 |
TUBEWELL NEAR THE HOIUSE OF JAGANNATH PRADHAN AT NELUA1 |
Plinth level |
-
latitude : 22.02329166666667
Longitude : 87.76946333333332
file name : Image_09052022154628330.png
|
2022-05-09 15:46:28.44246 |
168 |
49135034 |
TUBEWELL NEAR THE HOIUSE OF JAGANNATH PRADHAN AT NELUA |
200000 |
TUBEWELL NEAR THE HOIUSE OF JAGANNATH PRADHAN AT NELUA1 |
Completion of work |
-
latitude : 22.02335333333333
Longitude : 87.76951333333334
file name : Image_09052022154255338.png
|
2022-05-09 15:42:55.439423 |
169 |
47985664 |
Drinking water Pipeline at mouza Kotebarh near the H/o Sankar Das |
50000 |
Drinking water Pipeline at mouza Kotebarh near the H/o Sankar Das1 |
Completion of work |
-
latitude : 22.05550333333333,22.055806666666665
Longitude : 87.77875333333334,87.77836
file name : Image_13052022190049481.png
|
2022-05-13 19:00:49.58162 |
170 |
49137690 |
WATER PIPELINE FROM DURYADHAN MONDAL TO JOYNARAYAN MONDAL AT DEURIBARH |
50000 |
WATER PIPELINE FROM DURYADHAN MONDAL TO JOYNARAYAN MONDAL AT DEURIBARH1 |
Plinth level |
-
latitude : 22.00865666666667,22.00865666666667
Longitude : 87.76024333333335,87.76024333333335
file name : Image_11052022161906973.png
|
2022-05-11 16:19:07.103113 |
171 |
49137690 |
WATER PIPELINE FROM DURYADHAN MONDAL TO JOYNARAYAN MONDAL AT DEURIBARH |
50000 |
WATER PIPELINE FROM DURYADHAN MONDAL TO JOYNARAYAN MONDAL AT DEURIBARH1 |
Completion of work |
-
latitude : 22.00861166666667,22.008733333333332
Longitude : 87.76035500000002,87.76046
file name : Image_11052022155049385.png
|
2022-05-11 15:50:49.497232 |
172 |
49129688 |
TUBEWELL NEAR THE HOUSE OF RAMESH MONDAL AT SUKRULLAPUR |
200000 |
TUBEWELL NEAR THE HOUSE OF RAMESH MONDAL AT SUKRULLAPUR1 |
Completion of work |
-
latitude : 22.013658333333336
Longitude : 87.77074499999999
file name : Image_11052022162745050.png
|
2022-05-11 16:27:45.162604 |
173 |
49129688 |
TUBEWELL NEAR THE HOUSE OF RAMESH MONDAL AT SUKRULLAPUR |
200000 |
TUBEWELL NEAR THE HOUSE OF RAMESH MONDAL AT SUKRULLAPUR1 |
Plinth level |
-
latitude : 22.01353
Longitude : 87.77077
file name : Image_11052022163002394.png
|
2022-05-11 16:30:02.519024 |
174 |
49129688 |
TUBEWELL NEAR THE HOUSE OF RAMESH MONDAL AT SUKRULLAPUR |
200000 |
TUBEWELL NEAR THE HOUSE OF RAMESH MONDAL AT SUKRULLAPUR1 |
Roof laid |
-
latitude : 22.013655000000004
Longitude : 87.77074333333333
file name : Image_11052022163144245.png
|
2022-05-11 16:31:44.346123 |
175 |
56581674 |
PIPELINE AT MOUZA RAMCHAK FROM THE HO BADAL MANDAL TO THE HO JOYDEV DAS AND PUCCA BRIDGE |
49937 |
PIPELINE AT MOUZA RAMCHAK FROM THE HO BADAL MANDAL TO THE HO JOYDEV DAS AND PUCCA BRIDGE1 |
Roof laid |
-
latitude : 22.0381975,22.03819843
Longitude : 87.7730759,87.77307616
file name : Image_04052023164656518.png
|
2023-05-04 16:46:56.586502 |
176 |
56581674 |
PIPELINE AT MOUZA RAMCHAK FROM THE HO BADAL MANDAL TO THE HO JOYDEV DAS AND PUCCA BRIDGE |
49937 |
PIPELINE AT MOUZA RAMCHAK FROM THE HO BADAL MANDAL TO THE HO JOYDEV DAS AND PUCCA BRIDGE1 |
Roof laid |
-
latitude : 22.0381605,22.03817523
Longitude : 87.77309061,87.77310428
file name : Image_04052023164230421.png
|
2023-05-04 16:42:30.482723 |
177 |
68464154 |
Pipeline connection for water supply to all houses |
70000 |
Pipeline connection for water supply to all houses1 |
Roof laid |
-
latitude : 22.03856291
Longitude : 87.7626455
file name : Image_29122023120539024.png
|
2023-12-29 12:05:39.094687 |
178 |
68464154 |
Pipeline connection for water supply to all houses |
70000 |
Pipeline connection for water supply to all houses1 |
Plinth level |
-
latitude : 22.03856056
Longitude : 87.76263876
file name : Image_29122023120225176.png
|
2023-12-29 12:02:25.248799 |
179 |
68464154 |
Pipeline connection for water supply to all houses |
70000 |
Pipeline connection for water supply to all houses1 |
Completion of work |
-
latitude : 22.03855488
Longitude : 87.76267634
file name : Image_29122023115840760.png
|
2023-12-29 11:58:40.818573 |
180 |
49118536 |
TUBEWELL NEAR THE HOUSE OF SK KUTUBUDDIN AT DALBARH |
200000 |
TUBEWELL NEAR THE HOUSE OF SK KUTUBUDDIN AT DALBARH1 |
Roof laid |
-
latitude : 22.037640000000003
Longitude : 87.78665166666666
file name : Image_15072022175603294.png
|
2022-07-15 17:56:03.405808 |
181 |
49118536 |
TUBEWELL NEAR THE HOUSE OF SK KUTUBUDDIN AT DALBARH |
200000 |
TUBEWELL NEAR THE HOUSE OF SK KUTUBUDDIN AT DALBARH1 |
Plinth level |
-
latitude : 22.03784333333333
Longitude : 87.78686333333332
file name : Image_15072022175155328.png
|
2022-07-15 17:51:55.429893 |
182 |
49118536 |
TUBEWELL NEAR THE HOUSE OF SK KUTUBUDDIN AT DALBARH |
200000 |
TUBEWELL NEAR THE HOUSE OF SK KUTUBUDDIN AT DALBARH1 |
Completion of work |
-
latitude : 22.0389239
Longitude : 87.7878617
file name : Image_15072022174808109.png
|
2022-07-15 17:48:08.222484 |
183 |
49138143 |
TUBEWELL REPAIR NEAR THE HOUSE OF ANSAR SAHA AT KOTEBARH |
15000 |
TUBEWELL REPAIR NEAR THE HOUSE OF ANSAR SAHA AT KOTEBARH1 |
Roof laid |
-
latitude : 22.046605
Longitude : 87.78539666666666
file name : Image_27082022154021284.png
|
2022-08-27 15:40:21.385684 |
184 |
49138143 |
TUBEWELL REPAIR NEAR THE HOUSE OF ANSAR SAHA AT KOTEBARH |
15000 |
TUBEWELL REPAIR NEAR THE HOUSE OF ANSAR SAHA AT KOTEBARH1 |
Plinth level |
-
latitude : 22.046550000000003
Longitude : 87.78537499999999
file name : Image_27082022153339538.png
|
2022-08-27 15:33:39.637597 |
185 |
49138143 |
TUBEWELL REPAIR NEAR THE HOUSE OF ANSAR SAHA AT KOTEBARH |
15000 |
TUBEWELL REPAIR NEAR THE HOUSE OF ANSAR SAHA AT KOTEBARH1 |
Completion of work |
-
latitude : 22.046689
Longitude : 87.7851397
file name : Image_27082022152847428.png
|
2022-08-27 15:28:47.524325 |
186 |
49138218 |
TUBEWELL REPAIR NEAR THE HOUSE OF SANKAR PRADHAN AT KOTEBARH |
15000 |
TUBEWELL REPAIR NEAR THE HOUSE OF SANKAR PRADHAN AT KOTEBARH1 |
Roof laid |
-
latitude : 22.046995
Longitude : 87.78301666666667
file name : Image_27082022152331517.png
|
2022-08-27 15:23:31.626965 |
187 |
49138218 |
TUBEWELL REPAIR NEAR THE HOUSE OF SANKAR PRADHAN AT KOTEBARH |
15000 |
TUBEWELL REPAIR NEAR THE HOUSE OF SANKAR PRADHAN AT KOTEBARH1 |
Plinth level |
-
latitude : 22.04699333333333
Longitude : 87.78309166666668
file name : Image_27082022152055560.png
|
2022-08-27 15:20:55.651788 |
188 |
49138218 |
TUBEWELL REPAIR NEAR THE HOUSE OF SANKAR PRADHAN AT KOTEBARH |
15000 |
TUBEWELL REPAIR NEAR THE HOUSE OF SANKAR PRADHAN AT KOTEBARH1 |
Completion of work |
-
latitude : 22.046938333333333
Longitude : 87.78303833333332
file name : Image_27082022151347918.png
|
2022-08-27 15:13:48.0091 |
189 |
56633399 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA CHOWDHUNIA FROM THE HOUSE OF MADHAB SHIT TO PRAFULLA PATRAA |
49937 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA CHOWDHUNIA FROM THE HOUSE OF MADHAB SHIT TO PRAFULLA PATRAA1 |
Completion of work |
-
latitude : 22.0402871,22.0402871
Longitude : 87.7814209,87.7814209
file name : Image_23042023152319499.png
|
2023-04-23 15:23:19.56753 |
190 |
56633399 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA CHOWDHUNIA FROM THE HOUSE OF MADHAB SHIT TO PRAFULLA PATRAA |
49937 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA CHOWDHUNIA FROM THE HOUSE OF MADHAB SHIT TO PRAFULLA PATRAA1 |
Plinth level |
-
latitude : 22.03928418,22.03928108,22.03928082
Longitude : 87.7824095,87.78240516,87.78240506
file name : Image_23042023153220852.png
|
2023-04-23 15:32:20.921854 |
191 |
56581481 |
PIPELINE AT MOUZA RAMCHAK FROM THE HO SUBHAS MAITY TO THE HO RANJAN GHORAI |
49937 |
PIPELINE AT MOUZA RAMCHAK FROM THE HO SUBHAS MAITY TO THE HO RANJAN GHORAI1 |
Completion of work |
-
latitude : 22.0336769,22.03367056
Longitude : 87.77137737,87.77137914
file name : Image_23042023154328643.png
|
2023-04-23 15:43:28.699234 |
192 |
56581481 |
PIPELINE AT MOUZA RAMCHAK FROM THE HO SUBHAS MAITY TO THE HO RANJAN GHORAI |
49937 |
PIPELINE AT MOUZA RAMCHAK FROM THE HO SUBHAS MAITY TO THE HO RANJAN GHORAI1 |
Plinth level |
-
latitude : 22.03360557,22.03360573
Longitude : 87.77135597,87.77135568
file name : Image_23042023154726125.png
|
2023-04-23 15:47:26.206675 |
193 |
56551431 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA P RADHAUR FROM MONDAL PARA TO HO MONORANJAN MAITY |
49937 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA P RADHAUR FROM MONDAL PARA TO HO MONORANJAN MAITY1 |
Completion of work |
-
latitude : 22.0205174,22.02053656
Longitude : 87.74694787,87.74693286
file name : Image_23042023160654524.png
|
2023-04-23 16:06:54.580669 |
194 |
56551431 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA P RADHAUR FROM MONDAL PARA TO HO MONORANJAN MAITY |
49937 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA P RADHAUR FROM MONDAL PARA TO HO MONORANJAN MAITY1 |
Plinth level |
-
latitude : 22.02053638,22.02053558
Longitude : 87.7469601,87.74695926
file name : Image_23042023161125199.png
|
2023-04-23 16:11:25.251282 |
195 |
68466323 |
Pipeline connection for water supply to all houses |
49541 |
Pipeline connection for water supply to all houses1 |
Roof laid |
-
latitude : 22.0586551
Longitude : 87.7758297
file name : Image_28122023142149174.png
|
2023-12-28 14:21:49.255461 |
196 |
68466323 |
Pipeline connection for water supply to all houses |
49541 |
Pipeline connection for water supply to all houses1 |
Plinth level |
-
latitude : 22.05890354
Longitude : 87.77531578
file name : Image_28122023141858444.png
|
2023-12-28 14:18:58.534622 |
197 |
68466323 |
Pipeline connection for water supply to all houses |
49541 |
Pipeline connection for water supply to all houses1 |
Completion of work |
-
latitude : 22.05935893
Longitude : 87.77509036
file name : Image_28122023141350983.png
|
2023-12-28 14:13:51.053766 |
198 |
56633512 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA CHOWDHUNIA FROM THE HOUSE OF ASWINI MAIKAP |
191999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA CHOWDHUNIA FROM THE HOUSE OF ASWINI MAIKAP1 |
Roof laid |
-
latitude : 22.03454675
Longitude : 87.7850291
file name : Image_09082023130934632.png
|
2023-08-09 13:09:34.714182 |
199 |
56633512 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA CHOWDHUNIA FROM THE HOUSE OF ASWINI MAIKAP |
191999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA CHOWDHUNIA FROM THE HOUSE OF ASWINI MAIKAP1 |
Plinth level |
-
latitude : 22.03452378
Longitude : 87.78502696
file name : Image_25072023131233491.png
|
2023-07-25 13:12:33.570667 |
200 |
56633512 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA CHOWDHUNIA FROM THE HOUSE OF ASWINI MAIKAP |
191999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA CHOWDHUNIA FROM THE HOUSE OF ASWINI MAIKAP1 |
Plinth level |
-
latitude : 22.03460752
Longitude : 87.7850072
file name : Image_25072023112607891.png
|
2023-07-25 11:26:07.962159 |
201 |
56633512 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA CHOWDHUNIA FROM THE HOUSE OF ASWINI MAIKAP |
191999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA CHOWDHUNIA FROM THE HOUSE OF ASWINI MAIKAP1 |
Completion of work |
-
latitude : 22.03457719
Longitude : 87.78503113
file name : Image_25072023111409228.png
|
2023-07-25 11:14:09.404959 |
202 |
56870492 |
ROAD REPAIR AT MOUZA SU CHARABARH FROM THE HO SUDHIR DAS TO THE HO NARAYAN MAITY |
150000 |
ROAD REPAIR AT MOUZA SU CHARABARH FROM THE HO SUDHIR DAS TO THE HO NARAYAN MAITY1 |
Roof laid |
-
latitude : 22.05645585,22.0564545
Longitude : 87.77082621,87.77082128
file name : Image_21072023163736979.png
|
2023-07-21 16:37:37.094063 |
203 |
56870492 |
ROAD REPAIR AT MOUZA SU CHARABARH FROM THE HO SUDHIR DAS TO THE HO NARAYAN MAITY |
150000 |
ROAD REPAIR AT MOUZA SU CHARABARH FROM THE HO SUDHIR DAS TO THE HO NARAYAN MAITY1 |
Plinth level |
-
latitude : 22.05649151,22.05647529
Longitude : 87.77084311,87.77083954
file name : Image_21072023163431681.png
|
2023-07-21 16:34:31.749232 |
204 |
56870492 |
ROAD REPAIR AT MOUZA SU CHARABARH FROM THE HO SUDHIR DAS TO THE HO NARAYAN MAITY |
150000 |
ROAD REPAIR AT MOUZA SU CHARABARH FROM THE HO SUDHIR DAS TO THE HO NARAYAN MAITY1 |
Completion of work |
-
latitude : 22.05631714,22.05637955
Longitude : 87.77092464,87.77093308
file name : Image_21072023162949412.png
|
2023-07-21 16:29:49.555966 |
205 |
56551847 |
Pipeline with platform and tank at mouza P Radhapur from Manab Kalyan Sangha to Bhaskar ch Dolai |
42113 |
Pipeline with platform and tank at mouza P Radhapur from Manab Kalyan Sangha to Bhaskar ch Dolai1 |
Completion of work |
-
latitude : 22.01967775,22.01967719
Longitude : 87.75377332,87.75374797
file name : Image_10062023101612362.png
|
2023-06-10 10:16:12.422654 |
206 |
56551847 |
Pipeline with platform and tank at mouza P Radhapur from Manab Kalyan Sangha to Bhaskar ch Dolai |
42113 |
Pipeline with platform and tank at mouza P Radhapur from Manab Kalyan Sangha to Bhaskar ch Dolai1 |
Roof laid |
-
latitude : 22.01974486,22.01974131
Longitude : 87.75372151,87.75370812
file name : Image_10062023102908818.png
|
2023-06-10 10:29:08.87024 |
207 |
56551847 |
Pipeline with platform and tank at mouza P Radhapur from Manab Kalyan Sangha to Bhaskar ch Dolai |
42113 |
Pipeline with platform and tank at mouza P Radhapur from Manab Kalyan Sangha to Bhaskar ch Dolai1 |
Plinth level |
-
latitude : 22.01968644,22.01968745,22.01968796
Longitude : 87.7537402,87.75374096,87.75374108
file name : Image_10062023102419892.png
|
2023-06-10 10:24:19.950494 |
208 |
56551847 |
Pipeline with platform and tank at mouza P Radhapur from Manab Kalyan Sangha to Bhaskar ch Dolai |
42113 |
Pipeline with platform and tank at mouza P Radhapur from Manab Kalyan Sangha to Bhaskar ch Dolai1 |
Completion of work |
-
latitude : 22.0201933,22.0196948
Longitude : 87.7521908,87.75372472
file name : Image_10062023101758810.png
|
2023-06-10 10:17:58.868296 |
209 |
39111196 |
Purchase of materials for VBD Sanitation Campain |
317054 |
Purchase of materials for VBD Sanitation Campain1 |
Roof laid |
-
latitude : 22.0555389
Longitude : 87.778947
file name : Image_11012023144304616.png
|
2023-01-11 14:43:04.74937 |
210 |
35138348 |
Extension of water pipe line at mouza Kotebarh |
100000 |
Extension of water pipe line at mouza Kotebarh1 |
Roof laid |
-
latitude : 22.04661128,22.04660394
Longitude : 87.78542299,87.78543633
file name : Image_25112021132220520.png
|
2021-11-25 13:22:20.619899 |
211 |
35138348 |
Extension of water pipe line at mouza Kotebarh |
100000 |
Extension of water pipe line at mouza Kotebarh1 |
Plinth level |
-
latitude : 22.04662177,22.04662526
Longitude : 87.78544048,87.78536468
file name : Image_25112021131637210.png
|
2021-11-25 13:16:37.319029 |
212 |
35138348 |
Extension of water pipe line at mouza Kotebarh |
100000 |
Extension of water pipe line at mouza Kotebarh1 |
Completion of work |
-
latitude : 22.04659444,22.04659023
Longitude : 87.78540959,87.78544991
file name : Image_25112021130151104.png
|
2021-11-25 13:01:51.199465 |
213 |
35138124 |
Upgradation of SubMurshiblePlatform Moza Kotebarh |
30000 |
Upgradation of SubMurshiblePlatform Moza Kotebarh1 |
Roof laid |
-
latitude : 22.04596951
Longitude : 87.7847937
file name : Image_25112021133540490.png
|
2021-11-25 13:35:40.598973 |
214 |
35138124 |
Upgradation of SubMurshiblePlatform Moza Kotebarh |
30000 |
Upgradation of SubMurshiblePlatform Moza Kotebarh1 |
Plinth level |
-
latitude : 22.04599737
Longitude : 87.78476815
file name : Image_25112021133306974.png
|
2021-11-25 13:33:07.080279 |
215 |
35138124 |
Upgradation of SubMurshiblePlatform Moza Kotebarh |
30000 |
Upgradation of SubMurshiblePlatform Moza Kotebarh1 |
Completion of work |
-
latitude : 22.04600505
Longitude : 87.78477177
file name : Image_25112021132839082.png
|
2021-11-25 13:28:39.188648 |
216 |
47975296 |
Water Pipeline at mouza Purba radhapur from the Manab Kalyan to the H/o Narayan Dolai |
30067 |
Water Pipeline at mouza Purba radhapur from the Manab Kalyan to the H/o Narayan Dolai1 |
Roof laid |
-
latitude : 22.02003039,22.02001822
Longitude : 87.7531596,87.75310193
file name : Image_24012023173241963.png
|
2023-01-24 17:32:42.071641 |
217 |
47975296 |
Water Pipeline at mouza Purba radhapur from the Manab Kalyan to the H/o Narayan Dolai |
30067 |
Water Pipeline at mouza Purba radhapur from the Manab Kalyan to the H/o Narayan Dolai1 |
Plinth level |
-
latitude : 22.02021821,22.02030188
Longitude : 87.75290297,87.7529172
file name : Image_24012023172247933.png
|
2023-01-24 17:22:48.030906 |
218 |
47975296 |
Water Pipeline at mouza Purba radhapur from the Manab Kalyan to the H/o Narayan Dolai |
30067 |
Water Pipeline at mouza Purba radhapur from the Manab Kalyan to the H/o Narayan Dolai1 |
Completion of work |
-
latitude : 22.02028067,22.02026313,22.02029559
Longitude : 87.75290725,87.7529246,87.75297857
file name : Image_24012023171525248.png
|
2023-01-24 17:15:25.359607 |
219 |
47976622 |
Water pipeline at mouza Bhu Charabarh from the H/o Bhaktiranjan Ghorai |
69822 |
Water pipeline at mouza Bhu Charabarh from the H/o Bhaktiranjan Ghorai1 |
Roof laid |
-
latitude : 22.06257612,22.06257548
Longitude : 87.77935423,87.77932094
file name : Image_30012023154653189.png
|
2023-01-30 15:46:53.282817 |
220 |
47976622 |
Water pipeline at mouza Bhu Charabarh from the H/o Bhaktiranjan Ghorai |
69822 |
Water pipeline at mouza Bhu Charabarh from the H/o Bhaktiranjan Ghorai1 |
Plinth level |
-
latitude : 22.0584207,22.0584207
Longitude : 87.7791834,87.7791834
file name : Image_30012023153901841.png
|
2023-01-30 15:39:01.941908 |
221 |
47976622 |
Water pipeline at mouza Bhu Charabarh from the H/o Bhaktiranjan Ghorai |
69822 |
Water pipeline at mouza Bhu Charabarh from the H/o Bhaktiranjan Ghorai1 |
Completion of work |
-
latitude : 22.06184864,22.0584204
Longitude : 87.77896945,87.7791871
file name : Image_30012023153501195.png
|
2023-01-30 15:35:01.291541 |
222 |
47977154 |
Water Pipeline at mouza Bhu Charabarh from the H/o Gurupada Bera bothside |
59703 |
Water Pipeline at mouza Bhu Charabarh from the H/o Gurupada Bera bothside1 |
Roof laid |
-
latitude : 22.06031636,22.06031631
Longitude : 87.77659807,87.77659081
file name : Image_30012023160841950.png
|
2023-01-30 16:08:42.0328 |
223 |
47977154 |
Water Pipeline at mouza Bhu Charabarh from the H/o Gurupada Bera bothside |
59703 |
Water Pipeline at mouza Bhu Charabarh from the H/o Gurupada Bera bothside1 |
Plinth level |
-
latitude : 22.06032412,22.06034799
Longitude : 87.77656151,87.77657765
file name : Image_30012023160427790.png
|
2023-01-30 16:04:27.879696 |
224 |
47977154 |
Water Pipeline at mouza Bhu Charabarh from the H/o Gurupada Bera bothside |
59703 |
Water Pipeline at mouza Bhu Charabarh from the H/o Gurupada Bera bothside1 |
Plinth level |
-
latitude : 22.06052618,22.06052749
Longitude : 87.77744881,87.77743781
file name : Image_30012023160420253.png
|
2023-01-30 16:04:20.387234 |
225 |
47977154 |
Water Pipeline at mouza Bhu Charabarh from the H/o Gurupada Bera bothside |
59703 |
Water Pipeline at mouza Bhu Charabarh from the H/o Gurupada Bera bothside1 |
Completion of work |
-
latitude : 22.06053523,22.06048196
Longitude : 87.77745498,87.77749905
file name : Image_30012023155348645.png
|
2023-01-30 15:53:48.769623 |
226 |
47472360 |
Upgradation of concrete road at mouza Nelua from the H/o Jagannath Pradhan to the H/o Jagannath |
149954 |
Upgradation of concrete road at mouza Nelua from the H/o Jagannath Pradhan to the H/o Jagannath 1 |
Plinth level |
-
latitude : 22.02353282,22.02351968
Longitude : 87.76937729,87.76937654
file name : Image_31012023172404053.png
|
2023-01-31 17:24:04.159601 |
227 |
47472360 |
Upgradation of concrete road at mouza Nelua from the H/o Jagannath Pradhan to the H/o Jagannath |
149954 |
Upgradation of concrete road at mouza Nelua from the H/o Jagannath Pradhan to the H/o Jagannath 1 |
Plinth level |
-
latitude : 22.02377607,22.02376397
Longitude : 87.76938731,87.76936099
file name : Image_31012023171045474.png
|
2023-01-31 17:10:45.584217 |
228 |
47472360 |
Upgradation of concrete road at mouza Nelua from the H/o Jagannath Pradhan to the H/o Jagannath |
149954 |
Upgradation of concrete road at mouza Nelua from the H/o Jagannath Pradhan to the H/o Jagannath 1 |
Completion of work |
-
latitude : 22.02375657,22.02376196
Longitude : 87.76939617,87.76941036
file name : Image_31012023170142043.png
|
2023-01-31 17:01:42.139464 |
229 |
49138751 |
WATER PIPELINE FROM BISWAJIT ROY TO ASIT DAS AT KOTEBARH |
59703 |
WATER PIPELINE FROM BISWAJIT ROY TO ASIT DAS AT KOTEBARH1 |
Roof laid |
-
latitude : 22.04780106,22.04777219
Longitude : 87.78389725,87.78388074
file name : Image_02022023172245214.png
|
2023-02-02 17:22:45.308884 |
230 |
49138751 |
WATER PIPELINE FROM BISWAJIT ROY TO ASIT DAS AT KOTEBARH |
59703 |
WATER PIPELINE FROM BISWAJIT ROY TO ASIT DAS AT KOTEBARH1 |
Plinth level |
-
latitude : 22.04794113,22.04794733
Longitude : 87.78365057,87.78367486
file name : Image_02022023171031537.png
|
2023-02-02 17:10:31.618642 |
231 |
49138751 |
WATER PIPELINE FROM BISWAJIT ROY TO ASIT DAS AT KOTEBARH |
59703 |
WATER PIPELINE FROM BISWAJIT ROY TO ASIT DAS AT KOTEBARH1 |
Completion of work |
-
latitude : 22.04758742,22.04759802
Longitude : 87.78371535,87.78371284
file name : Image_02022023170213690.png
|
2023-02-02 17:02:13.775898 |
232 |
49125341 |
TUBEWELL NEAR THE HOUSE OF SEKH MEHEBUR AT KOTEBARH |
199999 |
TUBEWELL NEAR THE HOUSE OF SEKH MEHEBUR AT KOTEBARH1 |
Roof laid |
-
latitude : 22.05057953
Longitude : 87.77302459
file name : Image_03022023131010391.png
|
2023-02-03 13:10:10.493398 |
233 |
49125341 |
TUBEWELL NEAR THE HOUSE OF SEKH MEHEBUR AT KOTEBARH |
199999 |
TUBEWELL NEAR THE HOUSE OF SEKH MEHEBUR AT KOTEBARH1 |
Plinth level |
-
latitude : 22.05060806
Longitude : 87.7729493
file name : Image_03022023130633605.png
|
2023-02-03 13:06:33.703164 |
234 |
49125341 |
TUBEWELL NEAR THE HOUSE OF SEKH MEHEBUR AT KOTEBARH |
199999 |
TUBEWELL NEAR THE HOUSE OF SEKH MEHEBUR AT KOTEBARH1 |
Completion of work |
-
latitude : 22.05059766
Longitude : 87.77299952
file name : Image_03022023130109331.png
|
2023-02-03 13:01:09.448299 |
235 |
49136923 |
WATER PIPELINE FROM AMAL MANDAL TO DILIP MANDAL ATDEURIBARH |
49937 |
WATER PIPELINE FROM AMAL MANDAL TO DILIP MANDAL ATDEURIBARH 1 |
Roof laid |
-
latitude : 22.0113542,22.0110712,22.0111581
Longitude : 87.7613841,87.7613806,87.7613771
file name : Image_03022023160335575.png
|
2023-02-03 16:03:35.656496 |
236 |
49136923 |
WATER PIPELINE FROM AMAL MANDAL TO DILIP MANDAL ATDEURIBARH |
49937 |
WATER PIPELINE FROM AMAL MANDAL TO DILIP MANDAL ATDEURIBARH 1 |
Plinth level |
-
latitude : 22.0110838,22.0110862,22.0113255
Longitude : 87.7613674,87.7613672,87.761374
file name : Image_03022023154838526.png
|
2023-02-03 15:48:38.63729 |
237 |
49136923 |
WATER PIPELINE FROM AMAL MANDAL TO DILIP MANDAL ATDEURIBARH |
49937 |
WATER PIPELINE FROM AMAL MANDAL TO DILIP MANDAL ATDEURIBARH 1 |
Completion of work |
-
latitude : 22.01082899,22.0113381
Longitude : 87.76079306,87.7613894
file name : Image_03022023153048881.png
|
2023-02-03 15:30:48.97973 |
238 |
49233489 |
water pipeline from Asish Ghorai to Mithu Bhunia at kalaberia |
84576 |
water pipeline from Asish Ghorai to Mithu Bhunia at kalaberia1 |
Roof laid |
-
latitude : 22.06053426,22.06049668
Longitude : 87.79307151,87.7930978
file name : Image_03022023164549260.png
|
2023-02-03 16:45:49.366331 |
239 |
49233489 |
water pipeline from Asish Ghorai to Mithu Bhunia at kalaberia |
84576 |
water pipeline from Asish Ghorai to Mithu Bhunia at kalaberia1 |
Plinth level |
-
latitude : 22.06059188,22.06056404
Longitude : 87.79285013,87.79285938
file name : Image_03022023164246295.png
|
2023-02-03 16:42:46.401136 |
240 |
49233489 |
water pipeline from Asish Ghorai to Mithu Bhunia at kalaberia |
84576 |
water pipeline from Asish Ghorai to Mithu Bhunia at kalaberia1 |
Completion of work |
-
latitude : 22.06104995,22.06100726
Longitude : 87.79221444,87.79216348
file name : Image_03022023163442890.png
|
2023-02-03 16:34:42.992301 |
241 |
49136826 |
TUBEWELL AT NIMNA BUNIADI VIDYALAY AT DEURIBARH |
199999 |
TUBEWELL AT NIMNA BUNIADI VIDYALAY AT DEURIBARH1 |
Roof laid |
-
latitude : 22.02392699
Longitude : 87.76511605
file name : Image_07022023161813814.png
|
2023-02-07 16:18:13.899154 |
242 |
49136826 |
TUBEWELL AT NIMNA BUNIADI VIDYALAY AT DEURIBARH |
199999 |
TUBEWELL AT NIMNA BUNIADI VIDYALAY AT DEURIBARH1 |
Plinth level |
-
latitude : 22.02390101
Longitude : 87.76501025
file name : Image_23012023120241177.png
|
2023-01-23 12:02:41.270778 |
243 |
56865279 |
ROAD REPAIR AT MOUZA PURBA RADHAPUR FROM THE HO CHITTARANJAN PATRA TO THE HO NANDA JANA |
150000 |
ROAD REPAIR AT MOUZA PURBA RADHAPUR FROM THE HO CHITTARANJAN PATRA TO THE HO NANDA JANA1 |
Roof laid |
-
latitude : 22.02733995,22.02733992
Longitude : 87.74657012,87.74657452
file name : Image_10062023105144433.png
|
2023-06-10 10:51:44.486936 |
244 |
56865279 |
ROAD REPAIR AT MOUZA PURBA RADHAPUR FROM THE HO CHITTARANJAN PATRA TO THE HO NANDA JANA |
150000 |
ROAD REPAIR AT MOUZA PURBA RADHAPUR FROM THE HO CHITTARANJAN PATRA TO THE HO NANDA JANA1 |
Plinth level |
-
latitude : 22.02735772,22.02735937
Longitude : 87.74657615,87.74657682
file name : Image_10062023104727484.png
|
2023-06-10 10:47:27.539539 |
245 |
56865279 |
ROAD REPAIR AT MOUZA PURBA RADHAPUR FROM THE HO CHITTARANJAN PATRA TO THE HO NANDA JANA |
150000 |
ROAD REPAIR AT MOUZA PURBA RADHAPUR FROM THE HO CHITTARANJAN PATRA TO THE HO NANDA JANA1 |
Completion of work |
-
latitude : 22.02736808,22.02736817
Longitude : 87.74654904,87.74654869
file name : Image_10062023104040053.png
|
2023-06-10 10:40:40.106989 |
246 |
56872810 |
CONCRETE ROAD AT MOUZA KOTEBARH FROM THE HO DIPAK KR SASMAL TO KOTEBARH BATTALA TEEN RASTAR MORE |
199846 |
CONCRETE ROAD AT MOUZA KOTEBARH FROM THE HO DIPAK KR SASMAL TO KOTEBARH BATTALA TEEN RASTAR MORE1 |
Roof laid |
-
latitude : 22.0523168,22.0523168
Longitude : 87.7830166,87.7830166
file name : Image_14032023124319804.png
|
2023-03-14 12:43:19.920819 |
247 |
56872810 |
CONCRETE ROAD AT MOUZA KOTEBARH FROM THE HO DIPAK KR SASMAL TO KOTEBARH BATTALA TEEN RASTAR MORE |
199846 |
CONCRETE ROAD AT MOUZA KOTEBARH FROM THE HO DIPAK KR SASMAL TO KOTEBARH BATTALA TEEN RASTAR MORE1 |
Plinth level |
-
latitude : 22.05193478,22.0523156
Longitude : 87.7840063,87.7830172
file name : Image_14032023124030824.png
|
2023-03-14 12:40:30.894239 |
248 |
56872810 |
CONCRETE ROAD AT MOUZA KOTEBARH FROM THE HO DIPAK KR SASMAL TO KOTEBARH BATTALA TEEN RASTAR MORE |
199846 |
CONCRETE ROAD AT MOUZA KOTEBARH FROM THE HO DIPAK KR SASMAL TO KOTEBARH BATTALA TEEN RASTAR MORE1 |
Completion of work |
-
latitude : 22.05208022,22.0520821
Longitude : 87.7856228,87.78561909
file name : Image_14032023123509761.png
|
2023-03-14 12:35:09.838463 |
249 |
47974275 |
Water pipeline at mouza Purba Radhapur from the H/o Suchibrata mondal to SSK |
53129 |
Water pipeline at mouza Purba Radhapur from the H/o Suchibrata mondal to SSK1 |
Roof laid |
-
latitude : 22.0197639,22.0197137
Longitude : 87.7498006,87.7498311
file name : Image_24012023154646095.png
|
2023-01-24 15:46:46.223557 |
250 |
47974275 |
Water pipeline at mouza Purba Radhapur from the H/o Suchibrata mondal to SSK |
53129 |
Water pipeline at mouza Purba Radhapur from the H/o Suchibrata mondal to SSK1 |
Plinth level |
-
latitude : 22.01972573,22.01971916
Longitude : 87.75129038,87.75128471
file name : Image_24012023153933785.png
|
2023-01-24 15:39:33.921151 |
251 |
47974275 |
Water pipeline at mouza Purba Radhapur from the H/o Suchibrata mondal to SSK |
53129 |
Water pipeline at mouza Purba Radhapur from the H/o Suchibrata mondal to SSK1 |
Completion of work |
-
latitude : 22.01950678,22.01959616
Longitude : 87.75167354,87.75164377
file name : Image_24012023152941906.png
|
2023-01-24 15:29:42.035234 |
252 |
56630008 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA KALABERIA NEAR THE HOUSE OF MOHIT BERA |
199999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA KALABERIA NEAR THE HOUSE OF MOHIT BERA1 |
Roof laid |
-
latitude : 22.05800171
Longitude : 87.79168808
file name : Image_14032023120109764.png
|
2023-03-14 12:01:09.845034 |
253 |
56630008 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA KALABERIA NEAR THE HOUSE OF MOHIT BERA |
199999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA KALABERIA NEAR THE HOUSE OF MOHIT BERA1 |
Plinth level |
-
latitude : 22.05800573
Longitude : 87.79171332
file name : Image_14032023115812207.png
|
2023-03-14 11:58:12.269405 |
254 |
56630008 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA KALABERIA NEAR THE HOUSE OF MOHIT BERA |
199999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA KALABERIA NEAR THE HOUSE OF MOHIT BERA1 |
Completion of work |
-
latitude : 22.05800396
Longitude : 87.79163913
file name : Image_14032023115501239.png
|
2023-03-14 11:55:01.306848 |
255 |
56865662 |
CONCRETE ROAD AT MOUZA PURBA RADHAPUR FROM THE POND OF SUVENDU PATRA TO THE HO MADHURI SASMAL |
149869 |
CONCRETE ROAD AT MOUZA PURBA RADHAPUR FROM THE POND OF SUVENDU PATRA TO THE HO MADHURI SASMAL1 |
Roof laid |
-
latitude : 22.02475167,22.02476973
Longitude : 87.74905388,87.74907247
file name : Image_14032023162347508.png
|
2023-03-14 16:23:47.570735 |
256 |
56865662 |
CONCRETE ROAD AT MOUZA PURBA RADHAPUR FROM THE POND OF SUVENDU PATRA TO THE HO MADHURI SASMAL |
149869 |
CONCRETE ROAD AT MOUZA PURBA RADHAPUR FROM THE POND OF SUVENDU PATRA TO THE HO MADHURI SASMAL1 |
Plinth level |
-
latitude : 22.02483277,22.02477457
Longitude : 87.74899377,87.74905651
file name : Image_01032023130950392.png
|
2023-03-01 13:09:50.490409 |
257 |
56865662 |
CONCRETE ROAD AT MOUZA PURBA RADHAPUR FROM THE POND OF SUVENDU PATRA TO THE HO MADHURI SASMAL |
149869 |
CONCRETE ROAD AT MOUZA PURBA RADHAPUR FROM THE POND OF SUVENDU PATRA TO THE HO MADHURI SASMAL1 |
Completion of work |
-
latitude : 22.02493007,22.02477658
Longitude : 87.74918878,87.7490825
file name : Image_01032023130649982.png
|
2023-03-01 13:06:50.073481 |
258 |
49126990 |
WATER PIPELINE FROM PLOT NO 1073-1015 AT SUKRULLAPUR |
49937 |
WATER PIPELINE FROM PLOT NO 1073-1015 AT SUKRULLAPUR1 |
Roof laid |
-
latitude : 22.01696609,22.01696852
Longitude : 87.78099707,87.78099786
file name : Image_23012023152158045.png
|
2023-01-23 15:21:58.136919 |
259 |
49126990 |
WATER PIPELINE FROM PLOT NO 1073-1015 AT SUKRULLAPUR |
49937 |
WATER PIPELINE FROM PLOT NO 1073-1015 AT SUKRULLAPUR1 |
Plinth level |
-
latitude : 22.01752795,22.0176197,22.01762349
Longitude : 87.78094621,87.78100803,87.78102342
file name : Image_23012023150510885.png
|
2023-01-23 15:05:10.978773 |
260 |
49126990 |
WATER PIPELINE FROM PLOT NO 1073-1015 AT SUKRULLAPUR |
49937 |
WATER PIPELINE FROM PLOT NO 1073-1015 AT SUKRULLAPUR1 |
Plinth level |
-
latitude : 22.01764411,22.01761908
Longitude : 87.78100794,87.78102894
file name : Image_23012023150516217.png
|
2023-01-23 15:05:16.306297 |
261 |
49126990 |
WATER PIPELINE FROM PLOT NO 1073-1015 AT SUKRULLAPUR |
49937 |
WATER PIPELINE FROM PLOT NO 1073-1015 AT SUKRULLAPUR1 |
Completion of work |
-
latitude : 22.01765519,22.01764715,22.01759682
Longitude : 87.78101617,87.78102864,87.78103686
file name : Image_23012023145618873.png
|
2023-01-23 14:56:18.989669 |
262 |
56869116 |
CONCRETE ROAD AT MOUZA DEURIBARH FROM THE HO LALTU DHAURIA TO THE FISHERY OF AMAL KR MANDAL |
149875 |
CONCRETE ROAD AT MOUZA DEURIBARH FROM THE HO LALTU DHAURIA TO THE FISHERY OF AMAL KR MANDAL1 |
Roof laid |
-
latitude : 22.01362195,22.01358803,22.01360417
Longitude : 87.75637003,87.75634434,87.75636269
file name : Image_16032023135627498.png
|
2023-03-16 13:56:27.562884 |
263 |
56869116 |
CONCRETE ROAD AT MOUZA DEURIBARH FROM THE HO LALTU DHAURIA TO THE FISHERY OF AMAL KR MANDAL |
149875 |
CONCRETE ROAD AT MOUZA DEURIBARH FROM THE HO LALTU DHAURIA TO THE FISHERY OF AMAL KR MANDAL1 |
Plinth level |
-
latitude : 22.01355594,22.01355389
Longitude : 87.75651351,87.75651305
file name : Image_16032023135329707.png
|
2023-03-16 13:53:29.784467 |
264 |
56869116 |
CONCRETE ROAD AT MOUZA DEURIBARH FROM THE HO LALTU DHAURIA TO THE FISHERY OF AMAL KR MANDAL |
149875 |
CONCRETE ROAD AT MOUZA DEURIBARH FROM THE HO LALTU DHAURIA TO THE FISHERY OF AMAL KR MANDAL1 |
Completion of work |
-
latitude : 22.01356966,22.01357416
Longitude : 87.75651579,87.75651158
file name : Image_16032023134937310.png
|
2023-03-16 13:49:37.379564 |
265 |
56871072 |
ROAD FREPAIR AT MOUZA BHU CHARABARH FROM THE HO BHIM GHORAI TO THE HO NIKUNJ GHORAI |
149966 |
ROAD FREPAIR AT MOUZA BHU CHARABARH FROM THE HO BHIM GHORAI TO THE HO NIKUNJ GHORAI1 |
Roof laid |
-
latitude : 22.06122985,22.06121862,22.06120542
Longitude : 87.77907168,87.77907233,87.77907425
file name : Image_14032023130822823.png
|
2023-03-14 13:08:22.900653 |
266 |
56871072 |
ROAD FREPAIR AT MOUZA BHU CHARABARH FROM THE HO BHIM GHORAI TO THE HO NIKUNJ GHORAI |
149966 |
ROAD FREPAIR AT MOUZA BHU CHARABARH FROM THE HO BHIM GHORAI TO THE HO NIKUNJ GHORAI1 |
Plinth level |
-
latitude : 22.06115318,22.06114021
Longitude : 87.779125,87.77911817
file name : Image_14032023130145746.png
|
2023-03-14 13:01:45.806819 |
267 |
56871072 |
ROAD FREPAIR AT MOUZA BHU CHARABARH FROM THE HO BHIM GHORAI TO THE HO NIKUNJ GHORAI |
149966 |
ROAD FREPAIR AT MOUZA BHU CHARABARH FROM THE HO BHIM GHORAI TO THE HO NIKUNJ GHORAI1 |
Completion of work |
-
latitude : 22.06156642,22.06157851
Longitude : 87.77885386,87.77886445
file name : Image_14032023125531134.png
|
2023-03-14 12:55:31.231886 |
268 |
49137061 |
WATER PIPELINE FROM SUDAM JANA TO SWAPAN KUMAR DAS AT DEURIBARH |
79948 |
WATER PIPELINE FROM SUDAM JANA TO SWAPAN KUMAR DAS AT DEURIBARH1 |
Roof laid |
-
latitude : 22.0167598,22.0167582
Longitude : 87.7663522,87.7663469
file name : Image_24012023175506850.png
|
2023-01-24 17:55:06.977658 |
269 |
49137061 |
WATER PIPELINE FROM SUDAM JANA TO SWAPAN KUMAR DAS AT DEURIBARH |
79948 |
WATER PIPELINE FROM SUDAM JANA TO SWAPAN KUMAR DAS AT DEURIBARH1 |
Plinth level |
-
latitude : 22.01846448,22.01845001,22.01843159
Longitude : 87.76589773,87.76590235,87.76594451
file name : Image_24012023174534181.png
|
2023-01-24 17:45:34.31174 |
270 |
49137061 |
WATER PIPELINE FROM SUDAM JANA TO SWAPAN KUMAR DAS AT DEURIBARH |
79948 |
WATER PIPELINE FROM SUDAM JANA TO SWAPAN KUMAR DAS AT DEURIBARH1 |
Completion of work |
-
latitude : 22.01844929,22.01847609
Longitude : 87.76592519,87.76595361
file name : Image_23012023155422646.png
|
2023-01-23 15:54:22.767988 |
271 |
56553788 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA SUKRULLAPUR NEAR R THE HOUSE OF SRINIBAS BARMAN |
199999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA SUKRULLAPUR NEAR R THE HOUSE OF SRINIBAS BARMAN1 |
Roof laid |
-
latitude : 22.0195251
Longitude : 87.7659794
file name : Image_21032023122635787.png
|
2023-03-21 12:26:35.847719 |
272 |
56553788 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA SUKRULLAPUR NEAR R THE HOUSE OF SRINIBAS BARMAN |
199999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA SUKRULLAPUR NEAR R THE HOUSE OF SRINIBAS BARMAN1 |
Plinth level |
-
latitude : 22.0195259
Longitude : 87.765979
file name : Image_21032023122252027.png
|
2023-03-21 12:22:52.090244 |
273 |
56553788 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA SUKRULLAPUR NEAR R THE HOUSE OF SRINIBAS BARMAN |
199999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA SUKRULLAPUR NEAR R THE HOUSE OF SRINIBAS BARMAN1 |
Completion of work |
-
latitude : 22.019526
Longitude : 87.7659789
file name : Image_21032023121651271.png
|
2023-03-21 12:16:51.328675 |
274 |
66897771 |
Construction of Community Sanitary Complex |
50354 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 22.05849578
Longitude : 87.7729715
file name : Image_14032023140752974.png
|
2023-03-14 14:07:53.039038 |
275 |
66897771 |
Construction of Community Sanitary Complex |
50354 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 22.05852667
Longitude : 87.77297065
file name : Image_14032023140217589.png
|
2023-03-14 14:02:17.652279 |
276 |
66897771 |
Construction of Community Sanitary Complex |
50354 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 22.05851975
Longitude : 87.7729382
file name : Image_14032023135833721.png
|
2023-03-14 13:58:33.794286 |
277 |
49127152 |
WATER PIPELINE FROM BIMAL GOSWAMI TO THE SUBMERSHIBLE |
87353 |
WATER PIPELINE FROM BIMAL GOSWAMI TO THE SUBMERSHIBLE1 |
Roof laid |
-
latitude : 22.02100215,22.02098777
Longitude : 87.77530836,87.77534691
file name : Image_23012023153859817.png
|
2023-01-23 15:38:59.923961 |
278 |
49127152 |
WATER PIPELINE FROM BIMAL GOSWAMI TO THE SUBMERSHIBLE |
87353 |
WATER PIPELINE FROM BIMAL GOSWAMI TO THE SUBMERSHIBLE1 |
Plinth level |
-
latitude : 22.02074146,22.02075711
Longitude : 87.77613969,87.77614957
file name : Image_23012023153224157.png
|
2023-01-23 15:32:24.25736 |
279 |
49127152 |
WATER PIPELINE FROM BIMAL GOSWAMI TO THE SUBMERSHIBLE |
87353 |
WATER PIPELINE FROM BIMAL GOSWAMI TO THE SUBMERSHIBLE1 |
Completion of work |
-
latitude : 22.02006173,22.02006457,22.0200671
Longitude : 87.77724538,87.7772461,87.77725004
file name : Image_23012023152331158.png
|
2023-01-23 15:23:31.257333 |
280 |
56583139 |
PIPELINE AT MOUZA GUMKIA FROM THE HOUSE OF AMIYO KUMAR GIRI TO DIPANKAR GIRI |
24000 |
PIPELINE AT MOUZA GUMKIA FROM THE HOUSE OF AMIYO KUMAR GIRI TO DIPANKAR GIRI1 |
Roof laid |
-
latitude : 22.0649725,22.06497282
Longitude : 87.75263258,87.75263295
file name : Image_14032023144805654.png
|
2023-03-14 14:48:05.70815 |
281 |
56583139 |
PIPELINE AT MOUZA GUMKIA FROM THE HOUSE OF AMIYO KUMAR GIRI TO DIPANKAR GIRI |
24000 |
PIPELINE AT MOUZA GUMKIA FROM THE HOUSE OF AMIYO KUMAR GIRI TO DIPANKAR GIRI1 |
Plinth level |
-
latitude : 22.06495179,22.06495177
Longitude : 87.75263963,87.75263949
file name : Image_14032023143801767.png
|
2023-03-14 14:38:01.831136 |
282 |
56583139 |
PIPELINE AT MOUZA GUMKIA FROM THE HOUSE OF AMIYO KUMAR GIRI TO DIPANKAR GIRI |
24000 |
PIPELINE AT MOUZA GUMKIA FROM THE HOUSE OF AMIYO KUMAR GIRI TO DIPANKAR GIRI1 |
Completion of work |
-
latitude : 22.06497657,22.06497617,22.06497612
Longitude : 87.752682,87.75268156,87.75268152
file name : Image_14032023143428086.png
|
2023-03-14 14:34:28.143047 |
283 |
66897987 |
Construction of Community Sanitary Complex |
199999 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 22.05684234
Longitude : 87.76733472
file name : Image_23042023163618000.png
|
2023-04-23 16:36:18.092835 |
284 |
66897987 |
Construction of Community Sanitary Complex |
199999 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 22.0568567
Longitude : 87.7673475
file name : Image_23042023164008876.png
|
2023-04-23 16:40:08.94516 |
285 |
66897987 |
Construction of Community Sanitary Complex |
199999 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 22.05683546
Longitude : 87.76732898
file name : Image_23042023164331734.png
|
2023-04-23 16:43:31.795745 |
286 |
56548914 |
SINKING OF TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA MONOHARPUR NEAR THE LAND OF KISHORE MONDAL |
199999 |
SINKING OF TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA MONOHARPUR NEAR THE LAND OF KISHORE MONDAL1 |
Plinth level |
-
latitude : 22.03762708
Longitude : 87.74350917
file name : Image_14032023160647856.png
|
2023-03-14 16:06:47.925931 |
287 |
56548914 |
SINKING OF TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA MONOHARPUR NEAR THE LAND OF KISHORE MONDAL |
199999 |
SINKING OF TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA MONOHARPUR NEAR THE LAND OF KISHORE MONDAL1 |
Roof laid |
-
latitude : 22.03761515
Longitude : 87.74356398
file name : Image_14032023160910220.png
|
2023-03-14 16:09:10.28571 |
288 |
56548914 |
SINKING OF TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA MONOHARPUR NEAR THE LAND OF KISHORE MONDAL |
199999 |
SINKING OF TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA MONOHARPUR NEAR THE LAND OF KISHORE MONDAL1 |
Completion of work |
-
latitude : 22.03761023
Longitude : 87.74353416
file name : Image_14032023155931010.png
|
2023-03-14 15:59:31.082737 |
289 |
56873779 |
ROAD REPAIR AT MOUZA KOTEBARH FROM THE HO RAFI BABU TO THE DHOSA OF GOPAL CHINI |
183901 |
ROAD REPAIR AT MOUZA KOTEBARH FROM THE HO RAFI BABU TO THE DHOSA OF GOPAL CHINI1 |
Roof laid |
-
latitude : 22.04813744,22.04812684
Longitude : 87.7805102,87.78052834
file name : Image_29122023160840099.png
|
2023-12-29 16:08:40.181563 |
290 |
56873779 |
ROAD REPAIR AT MOUZA KOTEBARH FROM THE HO RAFI BABU TO THE DHOSA OF GOPAL CHINI |
183901 |
ROAD REPAIR AT MOUZA KOTEBARH FROM THE HO RAFI BABU TO THE DHOSA OF GOPAL CHINI1 |
Plinth level |
-
latitude : 22.04815253,22.04815616
Longitude : 87.78051511,87.78051214
file name : Image_29122023160534411.png
|
2023-12-29 16:05:34.497375 |
291 |
56873779 |
ROAD REPAIR AT MOUZA KOTEBARH FROM THE HO RAFI BABU TO THE DHOSA OF GOPAL CHINI |
183901 |
ROAD REPAIR AT MOUZA KOTEBARH FROM THE HO RAFI BABU TO THE DHOSA OF GOPAL CHINI1 |
Completion of work |
-
latitude : 22.048077,22.04808042
Longitude : 87.78049842,87.78049581
file name : Image_29122023160002169.png
|
2023-12-29 16:00:02.249073 |
292 |
56873513 |
CONCRETE ROAD AT MOUZA DALBARH FROM THE PRY SCHOOL TO THE MANASA MANDIR |
160000 |
CONCRETE ROAD AT MOUZA DALBARH FROM THE PRY SCHOOL TO THE MANASA MANDIR1 |
Roof laid |
-
latitude : 22.04334093,22.04339272
Longitude : 87.78713475,87.78719414
file name : Image_10062023180103805.png
|
2023-06-10 18:01:03.858707 |
293 |
56873513 |
CONCRETE ROAD AT MOUZA DALBARH FROM THE PRY SCHOOL TO THE MANASA MANDIR |
160000 |
CONCRETE ROAD AT MOUZA DALBARH FROM THE PRY SCHOOL TO THE MANASA MANDIR1 |
Plinth level |
-
latitude : 22.04352889,22.04352874
Longitude : 87.78727884,87.78727908
file name : Image_10062023175815835.png
|
2023-06-10 17:58:15.895553 |
294 |
56873513 |
CONCRETE ROAD AT MOUZA DALBARH FROM THE PRY SCHOOL TO THE MANASA MANDIR |
160000 |
CONCRETE ROAD AT MOUZA DALBARH FROM THE PRY SCHOOL TO THE MANASA MANDIR1 |
Completion of work |
-
latitude : 22.04348743,22.04348891
Longitude : 87.7872564,87.78725955
file name : Image_10062023175421954.png
|
2023-06-10 17:54:22.010558 |
295 |
56552663 |
PIPELINE AT MOUZA SUKRULLAPUR FROM BANAYAN TREE TO THE HO MAHADEV SANTRA |
42113 |
PIPELINE AT MOUZA SUKRULLAPUR FROM BANAYAN TREE TO THE HO MAHADEV SANTRA1 |
Roof laid |
-
latitude : 22.02091414,22.02092065
Longitude : 87.77529127,87.77534661
file name : Image_20062023120514657.png
|
2023-06-20 12:05:14.724839 |
296 |
56552663 |
PIPELINE AT MOUZA SUKRULLAPUR FROM BANAYAN TREE TO THE HO MAHADEV SANTRA |
42113 |
PIPELINE AT MOUZA SUKRULLAPUR FROM BANAYAN TREE TO THE HO MAHADEV SANTRA1 |
Plinth level |
-
latitude : 22.01938725,22.01938621
Longitude : 87.7749993,87.77499725
file name : Image_20062023114226657.png
|
2023-06-20 11:42:26.721969 |
297 |
56552663 |
PIPELINE AT MOUZA SUKRULLAPUR FROM BANAYAN TREE TO THE HO MAHADEV SANTRA |
42113 |
PIPELINE AT MOUZA SUKRULLAPUR FROM BANAYAN TREE TO THE HO MAHADEV SANTRA1 |
Completion of work |
-
latitude : 22.01940768,22.019401
Longitude : 87.7749893,87.77497948
file name : Image_20062023113516781.png
|
2023-06-20 11:35:16.844839 |
298 |
56629311 |
CULVERT REPAIRING NEAR THE CREMATORIUM AT MOUZA BHU CHARABARH |
156226 |
CULVERT REPAIRING NEAR THE CREMATORIUM AT MOUZA BHU CHARABARH1 |
Roof laid |
-
latitude : 22.0635582
Longitude : 87.77535563
file name : Image_17102023162330609.png
|
2023-10-17 16:23:30.725721 |
299 |
56629311 |
CULVERT REPAIRING NEAR THE CREMATORIUM AT MOUZA BHU CHARABARH |
156226 |
CULVERT REPAIRING NEAR THE CREMATORIUM AT MOUZA BHU CHARABARH1 |
Plinth level |
-
latitude : 22.06354325
Longitude : 87.77531332
file name : Image_17102023162026913.png
|
2023-10-17 16:20:26.997495 |
300 |
56629311 |
CULVERT REPAIRING NEAR THE CREMATORIUM AT MOUZA BHU CHARABARH |
156226 |
CULVERT REPAIRING NEAR THE CREMATORIUM AT MOUZA BHU CHARABARH1 |
Completion of work |
-
latitude : 22.06362024
Longitude : 87.77547872
file name : Image_17102023160218443.png
|
2023-10-17 16:02:18.973773 |
301 |
56868760 |
ROAD REPAIR AT MOUZA SUKRULLAPUR FROM THE HO ARUP SUKUL TO THE HO MANIK KAR |
70873 |
ROAD REPAIR AT MOUZA SUKRULLAPUR FROM THE HO ARUP SUKUL TO THE HO MANIK KAR1 |
Roof laid |
-
latitude : 22.00917097,22.00917215
Longitude : 87.77992462,87.77992387
file name : Image_30032023132749710.png
|
2023-03-30 13:27:49.774762 |
302 |
56868760 |
ROAD REPAIR AT MOUZA SUKRULLAPUR FROM THE HO ARUP SUKUL TO THE HO MANIK KAR |
70873 |
ROAD REPAIR AT MOUZA SUKRULLAPUR FROM THE HO ARUP SUKUL TO THE HO MANIK KAR1 |
Plinth level |
-
latitude : 22.00917465,22.00917441
Longitude : 87.77991569,87.77991535
file name : Image_30032023132229180.png
|
2023-03-30 13:22:29.250287 |
303 |
56868760 |
ROAD REPAIR AT MOUZA SUKRULLAPUR FROM THE HO ARUP SUKUL TO THE HO MANIK KAR |
70873 |
ROAD REPAIR AT MOUZA SUKRULLAPUR FROM THE HO ARUP SUKUL TO THE HO MANIK KAR1 |
Completion of work |
-
latitude : 22.00907833,22.00907786
Longitude : 87.77986124,87.77986177
file name : Image_30032023131630319.png
|
2023-03-30 13:16:30.394344 |
304 |
56552372 |
PIPELINE AT MOUZA SUKRULLAPUR FROM THE HGOUSE OF ASIT KAR TO SATYRANJAN KAR |
49937 |
PIPELINE AT MOUZA SUKRULLAPUR FROM THE HGOUSE OF ASIT KAR TO SATYRANJAN KAR1 |
Roof laid |
-
latitude : 22.00966057,22.00966057
Longitude : 87.7784814,87.77848156
file name : Image_16032023143240953.png
|
2023-03-16 14:32:41.014354 |
305 |
56552372 |
PIPELINE AT MOUZA SUKRULLAPUR FROM THE HGOUSE OF ASIT KAR TO SATYRANJAN KAR |
49937 |
PIPELINE AT MOUZA SUKRULLAPUR FROM THE HGOUSE OF ASIT KAR TO SATYRANJAN KAR1 |
Plinth level |
-
latitude : 22.00841431,22.00840365
Longitude : 87.77845402,87.77846054
file name : Image_16032023142901780.png
|
2023-03-16 14:29:01.850915 |
306 |
56552372 |
PIPELINE AT MOUZA SUKRULLAPUR FROM THE HGOUSE OF ASIT KAR TO SATYRANJAN KAR |
49937 |
PIPELINE AT MOUZA SUKRULLAPUR FROM THE HGOUSE OF ASIT KAR TO SATYRANJAN KAR1 |
Completion of work |
-
latitude : 22.00838033,22.00838116
Longitude : 87.77848472,87.77848436
file name : Image_16032023142552797.png
|
2023-03-16 14:25:52.865548 |
307 |
56553655 |
PIPELINE AT MOUZA SUKRULLAPUR FROM THE HOUYSE OF ASIT KAR TO THE HO TAPAN MAITY |
42113 |
PIPELINE AT MOUZA SUKRULLAPUR FROM THE HOUYSE OF ASIT KAR TO THE HO TAPAN MAITY1 |
Roof laid |
-
latitude : 22.00971313,22.00971288
Longitude : 87.77843753,87.77843638
file name : Image_20062023111259571.png
|
2023-06-20 11:12:59.631169 |
308 |
56553655 |
PIPELINE AT MOUZA SUKRULLAPUR FROM THE HOUYSE OF ASIT KAR TO THE HO TAPAN MAITY |
42113 |
PIPELINE AT MOUZA SUKRULLAPUR FROM THE HOUYSE OF ASIT KAR TO THE HO TAPAN MAITY1 |
Plinth level |
-
latitude : 22.00944433,22.00943523
Longitude : 87.77884192,87.77888697
file name : Image_20062023105658101.png
|
2023-06-20 10:56:58.178894 |
309 |
56553655 |
PIPELINE AT MOUZA SUKRULLAPUR FROM THE HOUYSE OF ASIT KAR TO THE HO TAPAN MAITY |
42113 |
PIPELINE AT MOUZA SUKRULLAPUR FROM THE HOUYSE OF ASIT KAR TO THE HO TAPAN MAITY1 |
Completion of work |
-
latitude : 22.00966941,22.0097842
Longitude : 87.77847001,87.77838058
file name : Image_20062023104450035.png
|
2023-06-20 10:44:50.101848 |
310 |
56694563 |
PIPELINE AT MOUZA KALABERIA14 FROM THE HO OF KRISHNA DULAL DAS TO THE HO MANIKLAL SHIT VIA SAMBHUNAT |
42113 |
PIPELINE AT MOUZA KALABERIA14 FROM THE HO OF KRISHNA DULAL DAS TO THE HO MANIKLAL SHIT VIA SAMBHUNAT1 |
Roof laid |
-
latitude : 22.05904078,22.05904064
Longitude : 87.78692496,87.78692499
file name : Image_10062023174110089.png
|
2023-06-10 17:41:10.147586 |
311 |
56694563 |
PIPELINE AT MOUZA KALABERIA14 FROM THE HO OF KRISHNA DULAL DAS TO THE HO MANIKLAL SHIT VIA SAMBHUNAT |
42113 |
PIPELINE AT MOUZA KALABERIA14 FROM THE HO OF KRISHNA DULAL DAS TO THE HO MANIKLAL SHIT VIA SAMBHUNAT1 |
Plinth level |
-
latitude : 22.05904467,22.05904435
Longitude : 87.78691541,87.78691563
file name : Image_10062023173815215.png
|
2023-06-10 17:38:15.275939 |
312 |
56694563 |
PIPELINE AT MOUZA KALABERIA14 FROM THE HO OF KRISHNA DULAL DAS TO THE HO MANIKLAL SHIT VIA SAMBHUNAT |
42113 |
PIPELINE AT MOUZA KALABERIA14 FROM THE HO OF KRISHNA DULAL DAS TO THE HO MANIKLAL SHIT VIA SAMBHUNAT1 |
Completion of work |
-
latitude : 22.05905511,22.05906002
Longitude : 87.78689549,87.78689922
file name : Image_10062023173529436.png
|
2023-06-10 17:35:29.498391 |
313 |
68740503 |
Pipeline connection for water supply to all houses |
102000 |
Pipeline connection for water supply to all houses1 |
Roof laid |
-
latitude : 22.06330752
Longitude : 87.78451357
file name : Image_30082024143233473.png
|
2024-08-30 14:32:33.986554 |
314 |
68740503 |
Pipeline connection for water supply to all houses |
102000 |
Pipeline connection for water supply to all houses1 |
Plinth level |
-
latitude : 22.06336666
Longitude : 87.78453798
file name : Image_30082024142015798.png
|
2024-08-30 14:20:16.142608 |
315 |
68740503 |
Pipeline connection for water supply to all houses |
102000 |
Pipeline connection for water supply to all houses1 |
Completion of work |
-
latitude : 22.0634104
Longitude : 87.78457855
file name : Image_30082024141049858.png
|
2024-08-30 14:10:50.072906 |
316 |
68740503 |
Pipeline connection for water supply to all houses |
102000 |
Pipeline connection for water supply to all houses1 |
Completion of work |
-
latitude : 22.06344322
Longitude : 87.784408
file name : Image_30082024140001098.png
|
2024-08-30 14:00:01.971863 |
317 |
56548654 |
SPREADING OF PIELINE WITH PLATFORM AND TANK AT MOUZA MONOHARPUR FROM SHITALA MANDIR TO THE POND MADH |
69970 |
SPREADING OF PIELINE WITH PLATFORM AND TANK AT MOUZA MONOHARPUR FROM SHITALA MANDIR TO THE POND MADH1 |
Roof laid |
-
latitude : 22.0405898,22.04058567
Longitude : 87.75138486,87.75139251
file name : Image_10062023120227035.png
|
2023-06-10 12:02:27.108407 |
318 |
56548654 |
SPREADING OF PIELINE WITH PLATFORM AND TANK AT MOUZA MONOHARPUR FROM SHITALA MANDIR TO THE POND MADH |
69970 |
SPREADING OF PIELINE WITH PLATFORM AND TANK AT MOUZA MONOHARPUR FROM SHITALA MANDIR TO THE POND MADH1 |
Plinth level |
-
latitude : 22.04022146,22.04033121
Longitude : 87.75080395,87.75078537
file name : Image_10062023115824328.png
|
2023-06-10 11:58:24.39021 |
319 |
56548654 |
SPREADING OF PIELINE WITH PLATFORM AND TANK AT MOUZA MONOHARPUR FROM SHITALA MANDIR TO THE POND MADH |
69970 |
SPREADING OF PIELINE WITH PLATFORM AND TANK AT MOUZA MONOHARPUR FROM SHITALA MANDIR TO THE POND MADH1 |
Completion of work |
-
latitude : 22.0416494,22.0416494
Longitude : 87.7499288,87.7499288
file name : Image_10062023115428343.png
|
2023-06-10 11:54:28.401498 |
320 |
56549061 |
PIPELINE WITH PLATFORM AND TANKAT MOUZA MONOHARPUR FROM PUCCA BRIDGE TO JAGADISH SAHOO |
69970 |
PIPELINE WITH PLATFORM AND TANKAT MOUZA MONOHARPUR FROM PUCCA BRIDGE TO JAGADISH SAHOO1 |
Roof laid |
-
latitude : 22.04071273,22.04073013
Longitude : 87.74521932,87.74520762
file name : Image_10062023113238581.png
|
2023-06-10 11:32:38.640297 |
321 |
56549061 |
PIPELINE WITH PLATFORM AND TANKAT MOUZA MONOHARPUR FROM PUCCA BRIDGE TO JAGADISH SAHOO |
69970 |
PIPELINE WITH PLATFORM AND TANKAT MOUZA MONOHARPUR FROM PUCCA BRIDGE TO JAGADISH SAHOO1 |
Plinth level |
-
latitude : 22.04072439,22.04071298
Longitude : 87.74522749,87.74521579
file name : Image_10062023112700516.png
|
2023-06-10 11:27:00.575182 |
322 |
56549061 |
PIPELINE WITH PLATFORM AND TANKAT MOUZA MONOHARPUR FROM PUCCA BRIDGE TO JAGADISH SAHOO |
69970 |
PIPELINE WITH PLATFORM AND TANKAT MOUZA MONOHARPUR FROM PUCCA BRIDGE TO JAGADISH SAHOO1 |
Completion of work |
-
latitude : 22.0407202,22.04071992,22.040751
Longitude : 87.74514429,87.74514518,87.74517044
file name : Image_10062023112157067.png
|
2023-06-10 11:21:57.127067 |
323 |
68262769 |
Pipeline connection for water supply to all houses |
42000 |
Pipeline connection for water supply to all houses1 |
Roof laid |
-
latitude : 22.02536371,22.02537248
Longitude : 87.75221789,87.7521827
file name : Image_29082024104534276.png
|
2024-08-29 10:45:34.965972 |
324 |
68262769 |
Pipeline connection for water supply to all houses |
42000 |
Pipeline connection for water supply to all houses1 |
Plinth level |
-
latitude : 22.00981252,22.00981252
Longitude : 87.76469135,87.76469135
file name : Image_29082024104137738.png
|
2024-08-29 10:41:38.363679 |
325 |
68262769 |
Pipeline connection for water supply to all houses |
42000 |
Pipeline connection for water supply to all houses1 |
Completion of work |
-
latitude : 22.02529647,22.02530101
Longitude : 87.75217177,87.75220268
file name : Image_28082024144533385.png
|
2024-08-28 14:45:34.122548 |
326 |
99369747 |
Construction of roads |
170000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.02105604,22.02105514
Longitude : 87.76787123,87.76787043
file name : Image_29082024152139333.png
|
2024-08-29 15:21:39.683731 |
327 |
99369747 |
Construction of roads |
170000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.02095252,22.02095089
Longitude : 87.76841415,87.76841331
file name : Image_29082024151659923.png
|
2024-08-29 15:17:00.220688 |
328 |
99369747 |
Construction of roads |
170000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.02092697,22.02094895
Longitude : 87.76847746,87.76843575
file name : Image_29082024151015609.png
|
2024-08-29 15:10:15.81113 |
329 |
56633712 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA CHOWDHUNIA FROM THE HO OF SUKUMAR DAS TO SURAPATI MAIKAP |
59703 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA CHOWDHUNIA FROM THE HO OF SUKUMAR DAS TO SURAPATI MAIKAP1 |
Roof laid |
-
latitude : 22.0369018,22.0369018
Longitude : 87.783408,87.783408
file name : Image_16032023151435414.png
|
2023-03-16 15:14:35.483805 |
330 |
56633712 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA CHOWDHUNIA FROM THE HO OF SUKUMAR DAS TO SURAPATI MAIKAP |
59703 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA CHOWDHUNIA FROM THE HO OF SUKUMAR DAS TO SURAPATI MAIKAP1 |
Plinth level |
-
latitude : 22.03686433,22.03686443
Longitude : 87.78495299,87.78491538
file name : Image_16032023150930601.png
|
2023-03-16 15:09:30.668848 |
331 |
56633712 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA CHOWDHUNIA FROM THE HO OF SUKUMAR DAS TO SURAPATI MAIKAP |
59703 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA CHOWDHUNIA FROM THE HO OF SUKUMAR DAS TO SURAPATI MAIKAP1 |
Completion of work |
-
latitude : 22.0368232,22.03682334
Longitude : 87.78494691,87.78494648
file name : Image_16032023150533093.png
|
2023-03-16 15:05:33.153337 |
332 |
56633712 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA CHOWDHUNIA FROM THE HO OF SUKUMAR DAS TO SURAPATI MAIKAP |
59703 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA CHOWDHUNIA FROM THE HO OF SUKUMAR DAS TO SURAPATI MAIKAP1 |
Completion of work |
-
latitude : 22.02107035,22.02107305
Longitude : 87.76782031,87.76782209
file name : Image_14032023173411721.png
|
2023-03-14 17:34:11.804192 |
333 |
56628916 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA BHU CHARABARH NEAR CHARABARH GRAMYA MANDIR |
199999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA BHU CHARABARH NEAR CHARABARH GRAMYA MANDIR1 |
Roof laid |
-
latitude : 22.06026788
Longitude : 87.77555018
file name : Image_17032023160800504.png
|
2023-03-17 16:08:00.580657 |
334 |
56628916 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA BHU CHARABARH NEAR CHARABARH GRAMYA MANDIR |
199999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA BHU CHARABARH NEAR CHARABARH GRAMYA MANDIR1 |
Plinth level |
-
latitude : 22.0601305
Longitude : 87.77553609
file name : Image_17032023160043424.png
|
2023-03-17 16:00:43.500155 |
335 |
56628916 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA BHU CHARABARH NEAR CHARABARH GRAMYA MANDIR |
199999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA BHU CHARABARH NEAR CHARABARH GRAMYA MANDIR1 |
Completion of work |
-
latitude : 22.06024954
Longitude : 87.77548156
file name : Image_17032023154516386.png
|
2023-03-17 15:45:16.470399 |
336 |
56634086 |
TUBEWEL WITH SUBMERSHIBLE PUMP AT MOUZA KOTEBARH 19 NEAR THE HOUSE OF SK MESBAUDDIN |
199999 |
TUBEWEL WITH SUBMERSHIBLE PUMP AT MOUZA KOTEBARH 19 NEAR THE HOUSE OF SK MESBAUDDIN1 |
Roof laid |
-
latitude : 22.046048
Longitude : 87.7739098
file name : Image_17072023160759310.png
|
2023-07-17 16:07:59.378331 |
337 |
56634086 |
TUBEWEL WITH SUBMERSHIBLE PUMP AT MOUZA KOTEBARH 19 NEAR THE HOUSE OF SK MESBAUDDIN |
199999 |
TUBEWEL WITH SUBMERSHIBLE PUMP AT MOUZA KOTEBARH 19 NEAR THE HOUSE OF SK MESBAUDDIN1 |
Plinth level |
-
latitude : 22.0460146
Longitude : 87.7739179
file name : Image_13062023124920778.png
|
2023-06-13 12:49:20.848116 |
338 |
56634086 |
TUBEWEL WITH SUBMERSHIBLE PUMP AT MOUZA KOTEBARH 19 NEAR THE HOUSE OF SK MESBAUDDIN |
199999 |
TUBEWEL WITH SUBMERSHIBLE PUMP AT MOUZA KOTEBARH 19 NEAR THE HOUSE OF SK MESBAUDDIN1 |
Completion of work |
-
latitude : 22.0460145
Longitude : 87.7739252
file name : Image_13062023124231687.png
|
2023-06-13 12:42:31.753081 |
339 |
66898056 |
Construction of Community Sanitary Complex |
99888 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 22.04886747
Longitude : 87.7886224
file name : Image_13032023163009560.png
|
2023-03-13 16:30:09.630367 |
340 |
66898056 |
Construction of Community Sanitary Complex |
99888 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 22.04970645
Longitude : 87.78901486
file name : Image_13032023162238863.png
|
2023-03-13 16:22:38.917665 |
341 |
66898056 |
Construction of Community Sanitary Complex |
99888 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 22.04957955
Longitude : 87.78901783
file name : Image_13032023161110990.png
|
2023-03-13 16:11:11.045729 |
342 |
56700476 |
pipeline with platform and tank at mouza chowdhunia from the land of kenaram maity to chowdhunia shi |
49937 |
pipeline with platform and tank at mouza chowdhunia from the land of kenaram maity to chowdhunia shi1 |
Plinth level |
-
latitude : 22.0360215,22.0360215
Longitude : 87.7819105,87.7819105
file name : Image_16032023151958228.png
|
2023-03-16 15:19:58.284582 |
343 |
56700476 |
pipeline with platform and tank at mouza chowdhunia from the land of kenaram maity to chowdhunia shi |
49937 |
pipeline with platform and tank at mouza chowdhunia from the land of kenaram maity to chowdhunia shi1 |
Completion of work |
-
latitude : 22.0360204,22.0360227
Longitude : 87.7819074,87.781911
file name : Image_16032023151743612.png
|
2023-03-16 15:17:43.671175 |
344 |
66898099 |
Construction of Community Sanitary Complex |
99888 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 22.05146979
Longitude : 87.78730182
file name : Image_14032023113200038.png
|
2023-03-14 11:32:00.092181 |
345 |
66898099 |
Construction of Community Sanitary Complex |
99888 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 22.0505963
Longitude : 87.78848952
file name : Image_13032023164151866.png
|
2023-03-13 16:41:51.920904 |
346 |
66898099 |
Construction of Community Sanitary Complex |
99888 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 22.05054536
Longitude : 87.78846908
file name : Image_13032023163634788.png
|
2023-03-13 16:36:34.846389 |
347 |
66897958 |
Construction of Community Sanitary Complex |
50354 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 22.06192875
Longitude : 87.7680929
file name : Image_14032023142138371.png
|
2023-03-14 14:21:38.433728 |
348 |
66897958 |
Construction of Community Sanitary Complex |
50354 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 22.06191031
Longitude : 87.76808199
file name : Image_14032023141702572.png
|
2023-03-14 14:17:02.68131 |
349 |
56871501 |
CONCRETE ROAD AT MOUZA KALABERI FROM THE DHOSA BARI OF ASHOK DAS TO THE HO ROY PARA MORE |
149953 |
CONCRETE ROAD AT MOUZA KALABERI FROM THE DHOSA BARI OF ASHOK DAS TO THE HO ROY PARA MORE1 |
Plinth level |
-
latitude : 22.05633191,22.05635686
Longitude : 87.7861898,87.7861769
file name : Image_14032023122333379.png
|
2023-03-14 12:23:33.440071 |
350 |
56871501 |
CONCRETE ROAD AT MOUZA KALABERI FROM THE DHOSA BARI OF ASHOK DAS TO THE HO ROY PARA MORE |
149953 |
CONCRETE ROAD AT MOUZA KALABERI FROM THE DHOSA BARI OF ASHOK DAS TO THE HO ROY PARA MORE1 |
Completion of work |
-
latitude : 22.05611868,22.05612822
Longitude : 87.78614441,87.78615767
file name : Image_14032023121544484.png
|
2023-03-14 12:15:44.555306 |
351 |
56694877 |
PIPELINE AT MOUZA KALABERIA FROM THE HO TAPAS HALDER TO THE HO JHARNA HALDER VIA GURUPADA RO |
49937 |
PIPELINE AT MOUZA KALABERIA FROM THE HO TAPAS HALDER TO THE HO JHARNA HALDER VIA GURUPADA RO1 |
Plinth level |
-
latitude : 22.0591878,22.059195
Longitude : 87.7822322,87.7822367
file name : Image_14032023113844183.png
|
2023-03-14 11:38:44.250489 |
352 |
56694877 |
PIPELINE AT MOUZA KALABERIA FROM THE HO TAPAS HALDER TO THE HO JHARNA HALDER VIA GURUPADA RO |
49937 |
PIPELINE AT MOUZA KALABERIA FROM THE HO TAPAS HALDER TO THE HO JHARNA HALDER VIA GURUPADA RO1 |
Completion of work |
-
latitude : 22.0591935,22.0591935
Longitude : 87.7822538,87.7822538
file name : Image_14032023113359229.png
|
2023-03-14 11:33:59.287161 |
353 |
56869664 |
CONCRETE ROAD AT MOUZA BALARAMCHAK FROM THE HOUSE OF NISHIKANTA MAITY TO THE HO CHANDIDAS GUACHAIT |
149792 |
CONCRETE ROAD AT MOUZA BALARAMCHAK FROM THE HOUSE OF NISHIKANTA MAITY TO THE HO CHANDIDAS GUACHAIT1 |
Roof laid |
-
latitude : 22.0377151,22.037712
Longitude : 87.7668914,87.7668856
file name : Image_16032023130706227.png
|
2023-03-16 13:07:06.309447 |
354 |
56869664 |
CONCRETE ROAD AT MOUZA BALARAMCHAK FROM THE HOUSE OF NISHIKANTA MAITY TO THE HO CHANDIDAS GUACHAIT |
149792 |
CONCRETE ROAD AT MOUZA BALARAMCHAK FROM THE HOUSE OF NISHIKANTA MAITY TO THE HO CHANDIDAS GUACHAIT1 |
Plinth level |
-
latitude : 22.0377147,22.0377147
Longitude : 87.766884,87.7668835
file name : Image_16032023130305246.png
|
2023-03-16 13:03:05.318053 |
355 |
56869664 |
CONCRETE ROAD AT MOUZA BALARAMCHAK FROM THE HOUSE OF NISHIKANTA MAITY TO THE HO CHANDIDAS GUACHAIT |
149792 |
CONCRETE ROAD AT MOUZA BALARAMCHAK FROM THE HOUSE OF NISHIKANTA MAITY TO THE HO CHANDIDAS GUACHAIT1 |
Completion of work |
-
latitude : 22.0377151,22.0377146
Longitude : 87.7668914,87.7668905
file name : Image_16032023124116381.png
|
2023-03-16 12:41:16.449394 |
356 |
56582837 |
CONCRETE DRAIN AT MOUZA SHYAMCHAK NEAR THE MINI SHALLOW OF PRANAB DAS |
50196 |
CONCRETE DRAIN AT MOUZA SHYAMCHAK NEAR THE MINI SHALLOW OF PRANAB DAS1 |
Plinth level |
-
latitude : 22.05657183,22.05657076,22.05656581
Longitude : 87.75357697,87.75358115,87.75358725
file name : Image_14032023150014118.png
|
2023-03-14 15:00:14.174806 |
357 |
56582837 |
CONCRETE DRAIN AT MOUZA SHYAMCHAK NEAR THE MINI SHALLOW OF PRANAB DAS |
50196 |
CONCRETE DRAIN AT MOUZA SHYAMCHAK NEAR THE MINI SHALLOW OF PRANAB DAS1 |
Completion of work |
-
latitude : 22.05652363,22.05652364
Longitude : 87.75357878,87.75357876
file name : Image_14032023145705121.png
|
2023-03-14 14:57:05.179481 |
358 |
56581063 |
PIPELINE AT MOUZA NELUA FROM THE HO ARDHENDU SAHOO TO THE HO PRADIP SAHOO AND ASIT MAJEE |
49937 |
PIPELINE AT MOUZA NELUA FROM THE HO ARDHENDU SAHOO TO THE HO PRADIP SAHOO AND ASIT MAJEE1 |
Plinth level |
-
latitude : 22.02159169,22.02159303
Longitude : 87.76480848,87.76480793
file name : Image_16032023133957544.png
|
2023-03-16 13:39:57.679758 |
359 |
56581063 |
PIPELINE AT MOUZA NELUA FROM THE HO ARDHENDU SAHOO TO THE HO PRADIP SAHOO AND ASIT MAJEE |
49937 |
PIPELINE AT MOUZA NELUA FROM THE HO ARDHENDU SAHOO TO THE HO PRADIP SAHOO AND ASIT MAJEE1 |
Completion of work |
-
latitude : 22.02159022,22.02157456
Longitude : 87.76477755,87.76475902
file name : Image_16032023131825288.png
|
2023-03-16 13:18:25.360709 |
360 |
56582774 |
CONCRETE DRAIN AT MOUZA SHYAMCHAK NEAR SINDHUBALA SSK |
50196 |
CONCRETE DRAIN AT MOUZA SHYAMCHAK NEAR SINDHUBALA SSK1 |
Roof laid |
-
latitude : 22.0558987,22.05590066
Longitude : 87.753595,87.7535876
file name : Image_14032023150924107.png
|
2023-03-14 15:09:24.160947 |
361 |
56582774 |
CONCRETE DRAIN AT MOUZA SHYAMCHAK NEAR SINDHUBALA SSK |
50196 |
CONCRETE DRAIN AT MOUZA SHYAMCHAK NEAR SINDHUBALA SSK1 |
Plinth level |
-
latitude : 22.05590456,22.05590452
Longitude : 87.75360683,87.75360569
file name : Image_14032023150643923.png
|
2023-03-14 15:06:43.986558 |
362 |
56582774 |
CONCRETE DRAIN AT MOUZA SHYAMCHAK NEAR SINDHUBALA SSK |
50196 |
CONCRETE DRAIN AT MOUZA SHYAMCHAK NEAR SINDHUBALA SSK1 |
Completion of work |
-
latitude : 22.05586962,22.05587699
Longitude : 87.75358182,87.75359215
file name : Image_14032023150350726.png
|
2023-03-14 15:03:50.800184 |
363 |
47545495 |
Upgradation of concrete road at mouza Shyamchak from the H/O Arabindu Shain to the H/O Sudhanshu Pat |
199752 |
Upgradation of concrete road at mouza Shyamchak from the H/O Arabindu Shain to the H/O Sudhanshu Pat1 |
Completion of work |
-
latitude : 22.0543074,22.0543093
Longitude : 87.7541126,87.7541107
file name : Image_14032023153558571.png
|
2023-03-14 15:35:58.646815 |
364 |
56629750 |
PIPELINE AT MOUZA KALABERIA FROM THE HO RANJIT MONDAL TO THE HO SATYANARAYAN CHINI VIA UTTAM MONDAL |
49937 |
PIPELINE AT MOUZA KALABERIA FROM THE HO RANJIT MONDAL TO THE HO SATYANARAYAN CHINI VIA UTTAM MONDAL1 |
Plinth level |
-
latitude : 22.0545373,22.05454193
Longitude : 87.78155548,87.78155628
file name : Image_16032023122040422.png
|
2023-03-16 12:20:40.52596 |
365 |
56629750 |
PIPELINE AT MOUZA KALABERIA FROM THE HO RANJIT MONDAL TO THE HO SATYANARAYAN CHINI VIA UTTAM MONDAL |
49937 |
PIPELINE AT MOUZA KALABERIA FROM THE HO RANJIT MONDAL TO THE HO SATYANARAYAN CHINI VIA UTTAM MONDAL1 |
Completion of work |
-
latitude : 22.05454762,22.05455594
Longitude : 87.78145574,87.78146693
file name : Image_16032023120414282.png
|
2023-03-16 12:04:14.34708 |
366 |
56551174 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA PURBA RADHAPUR FROM THE HOUSE OF SANKAR PATRA TO PRAKASH PA |
69822 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA PURBA RADHAPUR FROM THE HOUSE OF SANKAR PATRA TO PRAKASH PA1 |
Completion of work |
-
latitude : 22.0249026,22.02490326,22.02489838
Longitude : 87.74910079,87.74910999,87.749114
file name : Image_14032023163035764.png
|
2023-03-14 16:30:35.83462 |
367 |
56551174 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA PURBA RADHAPUR FROM THE HOUSE OF SANKAR PATRA TO PRAKASH PA |
69822 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA PURBA RADHAPUR FROM THE HOUSE OF SANKAR PATRA TO PRAKASH PA1 |
Plinth level |
-
latitude : 22.02488386,22.02488256
Longitude : 87.74910683,87.74909855
file name : Image_14032023164156581.png
|
2023-03-14 16:41:56.681175 |
368 |
56865517 |
ROAD REPAIR AT MOUZA DAYALCHAK FROM THE HO KANAI CHAULIA TO THE HO PRADIP PATRA |
119994 |
ROAD REPAIR AT MOUZA DAYALCHAK FROM THE HO KANAI CHAULIA TO THE HO PRADIP PATRA1 |
Roof laid |
-
latitude : 22.02868921,22.02867947
Longitude : 87.75694041,87.75696065
file name : Image_14032023165305494.png
|
2023-03-14 16:53:05.557823 |
369 |
56865517 |
ROAD REPAIR AT MOUZA DAYALCHAK FROM THE HO KANAI CHAULIA TO THE HO PRADIP PATRA |
119994 |
ROAD REPAIR AT MOUZA DAYALCHAK FROM THE HO KANAI CHAULIA TO THE HO PRADIP PATRA1 |
Plinth level |
-
latitude : 22.02846531,22.02846243
Longitude : 87.75695837,87.75696701
file name : Image_01032023134505803.png
|
2023-03-01 13:45:05.895436 |
370 |
56865517 |
ROAD REPAIR AT MOUZA DAYALCHAK FROM THE HO KANAI CHAULIA TO THE HO PRADIP PATRA |
119994 |
ROAD REPAIR AT MOUZA DAYALCHAK FROM THE HO KANAI CHAULIA TO THE HO PRADIP PATRA1 |
Completion of work |
-
latitude : 22.02850477,22.02849038
Longitude : 87.75697425,87.75696953
file name : Image_01032023132518162.png
|
2023-03-01 13:25:18.250592 |
371 |
47469712 |
Upgradation of concrete road at mouza Sukrullapur from the Kali Mandir to the H/o Haradhan Kand |
149893 |
Upgradation of concrete road at mouza Sukrullapur from the Kali Mandir to the H/o Haradhan Kand1 |
Plinth level |
-
latitude : 22.02107442,22.02108671
Longitude : 87.76779153,87.7678015
file name : Image_14032023174139704.png
|
2023-03-14 17:41:39.7875 |
372 |
47469712 |
Upgradation of concrete road at mouza Sukrullapur from the Kali Mandir to the H/o Haradhan Kand |
149893 |
Upgradation of concrete road at mouza Sukrullapur from the Kali Mandir to the H/o Haradhan Kand1 |
Plinth level |
-
latitude : 22.02105814,22.02104681
Longitude : 87.76763721,87.76763581
file name : Image_14032023175234260.png
|
2023-03-14 17:52:34.317302 |
373 |
56580416 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA DEURIBARH NEAR THE HOUSE OF PRANAB KHATUA |
199999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA DEURIBARH NEAR THE HOUSE OF PRANAB KHATUA1 |
Roof laid |
-
latitude : 22.02167036
Longitude : 87.764338
file name : Image_21032023120957029.png
|
2023-03-21 12:09:57.107437 |
374 |
56580416 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA DEURIBARH NEAR THE HOUSE OF PRANAB KHATUA |
199999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA DEURIBARH NEAR THE HOUSE OF PRANAB KHATUA1 |
Plinth level |
-
latitude : 22.02164183
Longitude : 87.76433853
file name : Image_21032023120517204.png
|
2023-03-21 12:05:17.276192 |
375 |
56552144 |
PIPELINE AT MOUZA SUKRULLAPUR FROM THE HOUSE OF SASTI MONDAL TO RABINDRANATH DINDA |
49937 |
PIPELINE AT MOUZA SUKRULLAPUR FROM THE HOUSE OF SASTI MONDAL TO RABINDRANATH DINDA1 |
Roof laid |
-
latitude : 22.0192716,22.01927263
Longitude : 87.77858797,87.77858777
file name : Image_16032023145317922.png
|
2023-03-16 14:53:17.985874 |
376 |
56552144 |
PIPELINE AT MOUZA SUKRULLAPUR FROM THE HOUSE OF SASTI MONDAL TO RABINDRANATH DINDA |
49937 |
PIPELINE AT MOUZA SUKRULLAPUR FROM THE HOUSE OF SASTI MONDAL TO RABINDRANATH DINDA1 |
Plinth level |
-
latitude : 22.01923342,22.01922772
Longitude : 87.77859655,87.7786006
file name : Image_16032023144655750.png
|
2023-03-16 14:46:55.82508 |
377 |
56552144 |
PIPELINE AT MOUZA SUKRULLAPUR FROM THE HOUSE OF SASTI MONDAL TO RABINDRANATH DINDA |
49937 |
PIPELINE AT MOUZA SUKRULLAPUR FROM THE HOUSE OF SASTI MONDAL TO RABINDRANATH DINDA1 |
Completion of work |
-
latitude : 22.0194431,22.01921286
Longitude : 87.779254,87.77855679
file name : Image_16032023144303462.png
|
2023-03-16 14:43:03.525412 |
378 |
56581919 |
PIPELINE AT MOUZA BALARAMCHAK FROM THE HOUSE OF PASHUATI SARDAR TO RADHESHYAM DAS |
49937 |
PIPELINE AT MOUZA BALARAMCHAK FROM THE HOUSE OF PASHUATI SARDAR TO RADHESHYAM DAS1 |
Roof laid |
-
latitude : 22.0437435,22.04374344
Longitude : 87.7622912,87.76229117
file name : Image_16032023164324098.png
|
2023-03-16 16:43:24.157872 |
379 |
56581919 |
PIPELINE AT MOUZA BALARAMCHAK FROM THE HOUSE OF PASHUATI SARDAR TO RADHESHYAM DAS |
49937 |
PIPELINE AT MOUZA BALARAMCHAK FROM THE HOUSE OF PASHUATI SARDAR TO RADHESHYAM DAS1 |
Plinth level |
-
latitude : 22.04385869,22.04385865
Longitude : 87.76244341,87.76244341
file name : Image_16032023164009463.png
|
2023-03-16 16:40:09.513306 |
380 |
56581919 |
PIPELINE AT MOUZA BALARAMCHAK FROM THE HOUSE OF PASHUATI SARDAR TO RADHESHYAM DAS |
49937 |
PIPELINE AT MOUZA BALARAMCHAK FROM THE HOUSE OF PASHUATI SARDAR TO RADHESHYAM DAS1 |
Completion of work |
-
latitude : 22.04382175,22.04382468
Longitude : 87.76240431,87.76240244
file name : Image_16032023163501081.png
|
2023-03-16 16:35:01.132974 |
381 |
47996068 |
Drinking water pipeline at mouza Kalaberia from the H/o Amar Das to the H/o Tapas Das |
35401 |
Drinking water pipeline at mouza Kalaberia from the H/o Amar Das to the H/o Tapas Das1 |
Roof laid |
-
latitude : 22.05599169,22.05599307
Longitude : 87.78708984,87.78709025
file name : Image_21032023170040541.png
|
2023-03-21 17:00:40.604941 |
382 |
47996068 |
Drinking water pipeline at mouza Kalaberia from the H/o Amar Das to the H/o Tapas Das |
35401 |
Drinking water pipeline at mouza Kalaberia from the H/o Amar Das to the H/o Tapas Das1 |
Plinth level |
-
latitude : 22.05597084,22.05597084
Longitude : 87.78804478,87.78804475
file name : Image_21032023165431685.png
|
2023-03-21 16:54:31.751331 |
383 |
47996068 |
Drinking water pipeline at mouza Kalaberia from the H/o Amar Das to the H/o Tapas Das |
35401 |
Drinking water pipeline at mouza Kalaberia from the H/o Amar Das to the H/o Tapas Das1 |
Completion of work |
-
latitude : 22.05591831,22.05592406
Longitude : 87.78801358,87.78801603
file name : Image_21032023163738685.png
|
2023-03-21 16:37:38.782253 |
384 |
89198391 |
Creation of drainage channel for management of grey water |
204000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.0539732
Longitude : 87.7844869
file name : Image_30082024163338058.png
|
2024-08-30 16:33:38.563233 |
385 |
89198391 |
Creation of drainage channel for management of grey water |
204000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.05414135
Longitude : 87.78439578
file name : Image_30082024162845141.png
|
2024-08-30 16:28:45.576221 |
386 |
56873642 |
CONCRETE ROAD AT MOUZA KOTEBARH FROM THE HO SK EJAHAR KHAN TO THE HO JAKIR HOSSAIN |
149897 |
CONCRETE ROAD AT MOUZA KOTEBARH FROM THE HO SK EJAHAR KHAN TO THE HO JAKIR HOSSAIN1 |
Completion of work |
-
latitude : 22.04598312,22.04597897,22.04598153
Longitude : 87.77015326,87.77017691,87.77017738
file name : Image_23032023164322488.png
|
2023-03-23 16:43:22.590516 |
387 |
56866940 |
ROAD REPAIR WITH PILLING AT MOUZA BHAIRABICHAK FROM THE POND OF NIHARIKA MONFDAL TO SACHINDEV BARMAN |
89915 |
ROAD REPAIR WITH PILLING AT MOUZA BHAIRABICHAK FROM THE POND OF NIHARIKA MONFDAL TO SACHINDEV BARMAN1 |
Roof laid |
-
latitude : 22.01884686,22.01884844
Longitude : 87.78075264,87.78075404
file name : Image_23032023165507545.png
|
2023-03-23 16:55:07.6181 |
388 |
56866940 |
ROAD REPAIR WITH PILLING AT MOUZA BHAIRABICHAK FROM THE POND OF NIHARIKA MONFDAL TO SACHINDEV BARMAN |
89915 |
ROAD REPAIR WITH PILLING AT MOUZA BHAIRABICHAK FROM THE POND OF NIHARIKA MONFDAL TO SACHINDEV BARMAN1 |
Plinth level |
-
latitude : 22.01884048,22.01883808
Longitude : 87.78070876,87.78071862
file name : Image_23032023164915632.png
|
2023-03-23 16:49:15.698977 |
389 |
56866940 |
ROAD REPAIR WITH PILLING AT MOUZA BHAIRABICHAK FROM THE POND OF NIHARIKA MONFDAL TO SACHINDEV BARMAN |
89915 |
ROAD REPAIR WITH PILLING AT MOUZA BHAIRABICHAK FROM THE POND OF NIHARIKA MONFDAL TO SACHINDEV BARMAN1 |
Completion of work |
-
latitude : 22.01885504,22.01885724
Longitude : 87.78036386,87.78036146
file name : Image_23032023163305978.png
|
2023-03-23 16:33:06.063642 |
390 |
49233714 |
Swasan chulli at mouza Kalaberia |
169945 |
Swasan chulli at mouza Kalaberia1 |
Plinth level |
-
latitude : 22.05746085,22.05745831
Longitude : 87.79748495,87.79746646
file name : Image_31032023151647953.png
|
2023-03-31 15:16:48.024175 |
391 |
49233714 |
Swasan chulli at mouza Kalaberia |
169945 |
Swasan chulli at mouza Kalaberia1 |
Completion of work |
-
latitude : 22.05749625,22.05749553
Longitude : 87.79743906,87.79743839
file name : Image_31032023151039099.png
|
2023-03-31 15:10:39.199567 |
392 |
49127417 |
COVER CC DRAIN AT MOUZA SUKRULLAPUR |
240000 |
COVER CC DRAIN AT MOUZA SUKRULLAPUR1 |
Completion of work |
-
latitude : 22.01229248,22.01230088
Longitude : 87.78113564,87.78112874
file name : Image_31032023172242573.png
|
2023-03-31 17:22:42.65061 |
393 |
49127417 |
COVER CC DRAIN AT MOUZA SUKRULLAPUR |
240000 |
COVER CC DRAIN AT MOUZA SUKRULLAPUR1 |
Plinth level |
-
latitude : 22.01228411,22.01228751
Longitude : 87.78114158,87.78114406
file name : Image_31032023172628184.png
|
2023-03-31 17:26:28.248435 |
394 |
49129100 |
CULVERT NEAR THE BRAJA MANDAL FISHERY AT MOUZA SUKRULLAPUR |
202022 |
CULVERT NEAR THE BRAJA MANDAL FISHERY AT MOUZA SUKRULLAPUR1 |
Completion of work |
-
latitude : 22.01201239,22.01199932
Longitude : 87.77399441,87.77399185
file name : Image_31032023175600844.png
|
2023-03-31 17:56:00.908913 |
395 |
49129100 |
CULVERT NEAR THE BRAJA MANDAL FISHERY AT MOUZA SUKRULLAPUR |
202022 |
CULVERT NEAR THE BRAJA MANDAL FISHERY AT MOUZA SUKRULLAPUR1 |
Plinth level |
-
latitude : 22.01195349,22.01193582
Longitude : 87.77398876,87.77398155
file name : Image_31032023180016371.png
|
2023-03-31 18:00:16.442062 |
396 |
49129100 |
CULVERT NEAR THE BRAJA MANDAL FISHERY AT MOUZA SUKRULLAPUR |
202022 |
CULVERT NEAR THE BRAJA MANDAL FISHERY AT MOUZA SUKRULLAPUR1 |
Roof laid |
-
latitude : 22.01200859,22.01200303
Longitude : 87.77397854,87.7739718
file name : Image_31032023180336795.png
|
2023-03-31 18:03:36.860453 |
397 |
66898017 |
Construction of Community Sanitary Complex |
49978 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 22.05501176
Longitude : 87.77409536
file name : Image_31032023180546403.png
|
2023-03-31 18:05:46.494907 |
398 |
56628740 |
SLAB CULVERT WITH LOCK GATE AT MOUZA SU CHARABARH NEAR THE LAND OF KHOKAN DOLAI |
300000 |
SLAB CULVERT WITH LOCK GATE AT MOUZA SU CHARABARH NEAR THE LAND OF KHOKAN DOLAI1 |
Plinth level |
-
latitude : 22.05585653,22.05587128
Longitude : 87.77594128,87.77594073
file name : Image_10042023175020987.png
|
2023-04-10 17:50:21.056423 |
399 |
56628740 |
SLAB CULVERT WITH LOCK GATE AT MOUZA SU CHARABARH NEAR THE LAND OF KHOKAN DOLAI |
300000 |
SLAB CULVERT WITH LOCK GATE AT MOUZA SU CHARABARH NEAR THE LAND OF KHOKAN DOLAI1 |
Completion of work |
-
latitude : 22.05587259,22.05589222
Longitude : 87.77591872,87.7759147
file name : Image_10042023174812956.png
|
2023-04-10 17:48:13.02142 |
400 |
56580531 |
COMMUNITY TOILET AT MOUZA DEURIBARH NEAR THE NIMTALA YUVA SANGHA |
150000 |
COMMUNITY TOILET AT MOUZA DEURIBARH NEAR THE NIMTALA YUVA SANGHA1 |
Roof laid |
-
latitude : 22.0130071
Longitude : 87.75197603
file name : Image_29122023073111112.png
|
2023-12-29 07:31:11.18191 |
401 |
56580531 |
COMMUNITY TOILET AT MOUZA DEURIBARH NEAR THE NIMTALA YUVA SANGHA |
150000 |
COMMUNITY TOILET AT MOUZA DEURIBARH NEAR THE NIMTALA YUVA SANGHA1 |
Plinth level |
-
latitude : 22.01298871
Longitude : 87.75202611
file name : Image_29122023072749710.png
|
2023-12-29 07:27:49.788056 |
402 |
56580531 |
COMMUNITY TOILET AT MOUZA DEURIBARH NEAR THE NIMTALA YUVA SANGHA |
150000 |
COMMUNITY TOILET AT MOUZA DEURIBARH NEAR THE NIMTALA YUVA SANGHA1 |
Completion of work |
-
latitude : 22.01294601
Longitude : 87.7521133
file name : Image_29122023072201733.png
|
2023-12-29 07:22:01.811242 |
403 |
56633930 |
COMMUNITY TOILET AT MOUZA KOTEBARH 19 NEAR THE BUS STAND |
249914 |
COMMUNITY TOILET AT MOUZA KOTEBARH 19 NEAR THE BUS STAND1 |
Roof laid |
-
latitude : 22.0468998
Longitude : 87.7785891
file name : Image_26042023170445871.png
|
2023-04-26 17:04:46.270743 |
404 |
56633930 |
COMMUNITY TOILET AT MOUZA KOTEBARH 19 NEAR THE BUS STAND |
249914 |
COMMUNITY TOILET AT MOUZA KOTEBARH 19 NEAR THE BUS STAND1 |
Plinth level |
-
latitude : 22.0469216
Longitude : 87.7786005
file name : Image_26042023170038558.png
|
2023-04-26 17:00:38.639499 |
405 |
56633930 |
COMMUNITY TOILET AT MOUZA KOTEBARH 19 NEAR THE BUS STAND |
249914 |
COMMUNITY TOILET AT MOUZA KOTEBARH 19 NEAR THE BUS STAND1 |
Completion of work |
-
latitude : 22.0469195
Longitude : 87.7785717
file name : Image_26042023165454240.png
|
2023-04-26 16:54:54.307825 |
406 |
56631318 |
COMMUNITY TOILET AT MOUZA KOTEBARH 17 NEAR THE LAND OF BAPI GIRI |
149936 |
COMMUNITY TOILET AT MOUZA KOTEBARH 17 NEAR THE LAND OF BAPI GIRI1 |
Plinth level |
-
latitude : 22.04699584
Longitude : 87.783114
file name : Image_01052023130602923.png
|
2023-05-01 13:06:02.978457 |
407 |
88598894 |
Greywater management system |
54412 |
Greywater management system1 |
Roof laid |
-
latitude : 22.06369733
Longitude : 87.75123247
file name : Image_29122023094709683.png
|
2023-12-29 09:47:09.742575 |
408 |
88598894 |
Greywater management system |
54412 |
Greywater management system1 |
Plinth level |
-
latitude : 22.06374458
Longitude : 87.75127747
file name : Image_29122023094352994.png
|
2023-12-29 09:43:53.052756 |
409 |
88598894 |
Greywater management system |
54412 |
Greywater management system1 |
Completion of work |
-
latitude : 22.06381899
Longitude : 87.75140852
file name : Image_29122023094038458.png
|
2023-12-29 09:40:38.525085 |
410 |
68467741 |
Pipeline connection for water supply to all houses |
71319 |
Pipeline connection for water supply to all houses1 |
Roof laid |
-
latitude : 22.044275
Longitude : 87.78432901
file name : Image_29122023104200723.png
|
2023-12-29 10:42:00.78599 |
411 |
68467741 |
Pipeline connection for water supply to all houses |
71319 |
Pipeline connection for water supply to all houses1 |
Plinth level |
-
latitude : 22.04430735
Longitude : 87.78428406
file name : Image_29122023103918219.png
|
2023-12-29 10:39:18.283486 |
412 |
68467741 |
Pipeline connection for water supply to all houses |
71319 |
Pipeline connection for water supply to all houses1 |
Completion of work |
-
latitude : 22.04434839
Longitude : 87.7842571
file name : Image_29122023103701952.png
|
2023-12-29 10:37:02.012963 |
413 |
56869969 |
ROAD REPAIR AT MOUZA SHYAMCHAK FROM THE HO SAHADEV DAS TO THE HO UTTAR PARA GRAMMYA HARI MANDIR |
160000 |
ROAD REPAIR AT MOUZA SHYAMCHAK FROM THE HO SAHADEV DAS TO THE HO UTTAR PARA GRAMMYA HARI MANDIR1 |
Roof laid |
-
latitude : 22.05658082,22.05658301
Longitude : 87.75371051,87.75371834
file name : Image_29122023124552410.png
|
2023-12-29 12:45:52.48841 |
414 |
56869969 |
ROAD REPAIR AT MOUZA SHYAMCHAK FROM THE HO SAHADEV DAS TO THE HO UTTAR PARA GRAMMYA HARI MANDIR |
160000 |
ROAD REPAIR AT MOUZA SHYAMCHAK FROM THE HO SAHADEV DAS TO THE HO UTTAR PARA GRAMMYA HARI MANDIR1 |
Plinth level |
-
latitude : 22.05657417,22.05657405
Longitude : 87.75364945,87.75365976
file name : Image_29122023123936883.png
|
2023-12-29 12:39:36.961167 |
415 |
56869969 |
ROAD REPAIR AT MOUZA SHYAMCHAK FROM THE HO SAHADEV DAS TO THE HO UTTAR PARA GRAMMYA HARI MANDIR |
160000 |
ROAD REPAIR AT MOUZA SHYAMCHAK FROM THE HO SAHADEV DAS TO THE HO UTTAR PARA GRAMMYA HARI MANDIR1 |
Completion of work |
-
latitude : 22.05646682,22.0565029
Longitude : 87.753705,87.75366154
file name : Image_29122023123331502.png
|
2023-12-29 12:33:31.577193 |
416 |
56582125 |
PIPELINE AT MOUZA ASHUTIA FROM THE HOUSE OF TAPAN MAITY TO BHANU MAITY AND RAMPADA MAITY |
42113 |
PIPELINE AT MOUZA ASHUTIA FROM THE HOUSE OF TAPAN MAITY TO BHANU MAITY AND RAMPADA MAITY1 |
Roof laid |
-
latitude : 22.03756773,22.03756834
Longitude : 87.76263722,87.76263731
file name : Image_11062023124211820.png
|
2023-06-11 12:42:11.874588 |
417 |
56582125 |
PIPELINE AT MOUZA ASHUTIA FROM THE HOUSE OF TAPAN MAITY TO BHANU MAITY AND RAMPADA MAITY |
42113 |
PIPELINE AT MOUZA ASHUTIA FROM THE HOUSE OF TAPAN MAITY TO BHANU MAITY AND RAMPADA MAITY1 |
Plinth level |
-
latitude : 22.03844862,22.03844446
Longitude : 87.76265832,87.76265259
file name : Image_11062023123458079.png
|
2023-06-11 12:34:58.142103 |
418 |
56582125 |
PIPELINE AT MOUZA ASHUTIA FROM THE HOUSE OF TAPAN MAITY TO BHANU MAITY AND RAMPADA MAITY |
42113 |
PIPELINE AT MOUZA ASHUTIA FROM THE HOUSE OF TAPAN MAITY TO BHANU MAITY AND RAMPADA MAITY1 |
Completion of work |
-
latitude : 22.03844789,22.03845332
Longitude : 87.76263898,87.76264571
file name : Image_11062023122625503.png
|
2023-06-11 12:26:25.570774 |
419 |
56580159 |
PIPELINE AT MOUZA DEURIBARH FROM NIUMTALA MANDIR TO PRADIP KUMAR SASMAL |
42113 |
PIPELINE AT MOUZA DEURIBARH FROM NIUMTALA MANDIR TO PRADIP KUMAR SASMAL1 |
Plinth level |
-
latitude : 22.01308801,22.01308306
Longitude : 87.7513543,87.75135106
file name : Image_10062023092522250.png
|
2023-06-10 09:25:22.304552 |
420 |
56580159 |
PIPELINE AT MOUZA DEURIBARH FROM NIUMTALA MANDIR TO PRADIP KUMAR SASMAL |
42113 |
PIPELINE AT MOUZA DEURIBARH FROM NIUMTALA MANDIR TO PRADIP KUMAR SASMAL1 |
Completion of work |
-
latitude : 22.01309154,22.01307521
Longitude : 87.75133924,87.75132834
file name : Image_10062023091711380.png
|
2023-06-10 09:17:11.440661 |
421 |
56635943 |
PIPELINE AT MOUZA KOTEBARH21 FROM THE HO SK AMINUL TO THE HO BHAGABATI SAHOO |
42113 |
PIPELINE AT MOUZA KOTEBARH21 FROM THE HO SK AMINUL TO THE HO BHAGABATI SAHOO1 |
Plinth level |
-
latitude : 22.0399152,22.0399152
Longitude : 87.7816674,87.7816674
file name : Image_10062023165301934.png
|
2023-06-10 16:53:01.992614 |
422 |
56635943 |
PIPELINE AT MOUZA KOTEBARH21 FROM THE HO SK AMINUL TO THE HO BHAGABATI SAHOO |
42113 |
PIPELINE AT MOUZA KOTEBARH21 FROM THE HO SK AMINUL TO THE HO BHAGABATI SAHOO1 |
Completion of work |
-
latitude : 22.04214331,22.04215202
Longitude : 87.78228255,87.78228886
file name : Image_10062023162608709.png
|
2023-06-10 16:26:08.771097 |
423 |
56550418 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA PURBA RADHAPUR FROM MANAB KAIYAN TO SSK |
42113 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA PURBA RADHAPUR FROM MANAB KAIYAN TO SSK1 |
Plinth level |
-
latitude : 22.01990203,22.01989053
Longitude : 87.75239713,87.75238449
file name : Image_10062023100641075.png
|
2023-06-10 10:06:41.131675 |
424 |
56550418 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA PURBA RADHAPUR FROM MANAB KAIYAN TO SSK |
42113 |
PIPELINE WITH PLATFORM AND TANK AT MOUZA PURBA RADHAPUR FROM MANAB KAIYAN TO SSK1 |
Completion of work |
-
latitude : 22.02014479,22.02013414
Longitude : 87.75170607,87.75169882
file name : Image_10062023094917840.png
|
2023-06-10 09:49:17.9153 |
425 |
56550330 |
PIPELINE AT MOUZA DAYALCHAK FROM THE HOUSE OF BHABESH PATRA TO RABIN JANA |
57584 |
PIPELINE AT MOUZA DAYALCHAK FROM THE HOUSE OF BHABESH PATRA TO RABIN JANA1 |
Plinth level |
-
latitude : 22.02765101,22.02765326
Longitude : 87.75680542,87.75680288
file name : Image_13062023170916159.png
|
2023-06-13 17:09:16.224197 |
426 |
56550330 |
PIPELINE AT MOUZA DAYALCHAK FROM THE HOUSE OF BHABESH PATRA TO RABIN JANA |
57584 |
PIPELINE AT MOUZA DAYALCHAK FROM THE HOUSE OF BHABESH PATRA TO RABIN JANA1 |
Completion of work |
-
latitude : 22.02768571,22.02767617
Longitude : 87.75678376,87.75679563
file name : Image_13062023170123199.png
|
2023-06-13 17:01:23.264382 |
427 |
56870161 |
CONCRETE ROAD AT MOUZA BHU CHARABARH FROM THE HO TAPAN PAL TO THE HO NARUGOPAL DOLAI |
200000 |
CONCRETE ROAD AT MOUZA BHU CHARABARH FROM THE HO TAPAN PAL TO THE HO NARUGOPAL DOLAI1 |
Roof laid |
-
latitude : 22.0608311,22.0608304
Longitude : 87.769822,87.7698189
file name : Image_11062023120824090.png
|
2023-06-11 12:08:24.149182 |
428 |
56870161 |
CONCRETE ROAD AT MOUZA BHU CHARABARH FROM THE HO TAPAN PAL TO THE HO NARUGOPAL DOLAI |
200000 |
CONCRETE ROAD AT MOUZA BHU CHARABARH FROM THE HO TAPAN PAL TO THE HO NARUGOPAL DOLAI1 |
Plinth level |
-
latitude : 22.0608308,22.0608307
Longitude : 87.7698211,87.7698167
file name : Image_11062023120456573.png
|
2023-06-11 12:04:56.638783 |
429 |
56870161 |
CONCRETE ROAD AT MOUZA BHU CHARABARH FROM THE HO TAPAN PAL TO THE HO NARUGOPAL DOLAI |
200000 |
CONCRETE ROAD AT MOUZA BHU CHARABARH FROM THE HO TAPAN PAL TO THE HO NARUGOPAL DOLAI1 |
Completion of work |
-
latitude : 22.0608308,22.06035774
Longitude : 87.7698156,87.77044941
file name : Image_11062023115901018.png
|
2023-06-11 11:59:01.072937 |
430 |
56581549 |
PIPELINE AT MOUZA ASHUTIA FROM THE HOUSE OF SATYEN MAITY TO THE HO RAJIB MAITY |
42113 |
PIPELINE AT MOUZA ASHUTIA FROM THE HOUSE OF SATYEN MAITY TO THE HO RAJIB MAITY1 |
Roof laid |
-
latitude : 22.02668504,22.02664051
Longitude : 87.76561036,87.76563933
file name : Image_11062023080628322.png
|
2023-06-11 08:06:28.388855 |
431 |
56581549 |
PIPELINE AT MOUZA ASHUTIA FROM THE HOUSE OF SATYEN MAITY TO THE HO RAJIB MAITY |
42113 |
PIPELINE AT MOUZA ASHUTIA FROM THE HOUSE OF SATYEN MAITY TO THE HO RAJIB MAITY1 |
Plinth level |
-
latitude : 22.02666502,22.02666045
Longitude : 87.7657488,87.76573537
file name : Image_11062023075245475.png
|
2023-06-11 07:52:45.54764 |
432 |
56581549 |
PIPELINE AT MOUZA ASHUTIA FROM THE HOUSE OF SATYEN MAITY TO THE HO RAJIB MAITY |
42113 |
PIPELINE AT MOUZA ASHUTIA FROM THE HOUSE OF SATYEN MAITY TO THE HO RAJIB MAITY1 |
Completion of work |
-
latitude : 22.02669166,22.02669127
Longitude : 87.76571889,87.76571877
file name : Image_11062023070004759.png
|
2023-06-11 07:00:04.83864 |
433 |
56864731 |
CONCRETE ROAD AT MOUZA MONOHARPUR FROM THE HO RABISANKAR GUACHAIT TO THE HO CHITTARANJAN JANA |
150000 |
CONCRETE ROAD AT MOUZA MONOHARPUR FROM THE HO RABISANKAR GUACHAIT TO THE HO CHITTARANJAN JANA1 |
Plinth level |
-
latitude : 22.03801799,22.03801763
Longitude : 87.7483474,87.74834073
file name : Image_10062023114706013.png
|
2023-06-10 11:47:06.074544 |
434 |
56864731 |
CONCRETE ROAD AT MOUZA MONOHARPUR FROM THE HO RABISANKAR GUACHAIT TO THE HO CHITTARANJAN JANA |
150000 |
CONCRETE ROAD AT MOUZA MONOHARPUR FROM THE HO RABISANKAR GUACHAIT TO THE HO CHITTARANJAN JANA1 |
Completion of work |
-
latitude : 22.03807447,22.03807319
Longitude : 87.74837441,87.74838772
file name : Image_10062023114134691.png
|
2023-06-10 11:41:34.753386 |
435 |
56874103 |
CONCRETE ROAD AT MOUZA KOTEBARH FROM THE HO SK SAFIUDDIN TO THE HO SK MUSTAK |
150000 |
CONCRETE ROAD AT MOUZA KOTEBARH FROM THE HO SK SAFIUDDIN TO THE HO SK MUSTAK1 |
Plinth level |
-
latitude : 22.0449126,22.04491174
Longitude : 87.77042995,87.77042802
file name : Image_10062023161454208.png
|
2023-06-10 16:14:54.286093 |
436 |
56874103 |
CONCRETE ROAD AT MOUZA KOTEBARH FROM THE HO SK SAFIUDDIN TO THE HO SK MUSTAK |
150000 |
CONCRETE ROAD AT MOUZA KOTEBARH FROM THE HO SK SAFIUDDIN TO THE HO SK MUSTAK1 |
Completion of work |
-
latitude : 22.04464139,22.04464829
Longitude : 87.77056819,87.77056483
file name : Image_10062023160740034.png
|
2023-06-10 16:07:40.108338 |
437 |
56694251 |
PIPELINE AT MOUZA KALABERIA FROM THE HOUSE OF SUBAL MANDAL TO ANUKUL THAKUR MANDIR VIA RAMPADA SAHOO |
42113 |
PIPELINE AT MOUZA KALABERIA FROM THE HOUSE OF SUBAL MANDAL TO ANUKUL THAKUR MANDIR VIA RAMPADA SAHOO1 |
Roof laid |
-
latitude : 22.0582578,22.0582578
Longitude : 87.7796688,87.7796688
file name : Image_21062023174743746.png
|
2023-06-21 17:47:43.815559 |
438 |
56694251 |
PIPELINE AT MOUZA KALABERIA FROM THE HOUSE OF SUBAL MANDAL TO ANUKUL THAKUR MANDIR VIA RAMPADA SAHOO |
42113 |
PIPELINE AT MOUZA KALABERIA FROM THE HOUSE OF SUBAL MANDAL TO ANUKUL THAKUR MANDIR VIA RAMPADA SAHOO1 |
Plinth level |
-
latitude : 22.0582128,22.058246
Longitude : 87.7807635,87.7808353
file name : Image_21062023173137436.png
|
2023-06-21 17:31:37.503081 |
439 |
56694251 |
PIPELINE AT MOUZA KALABERIA FROM THE HOUSE OF SUBAL MANDAL TO ANUKUL THAKUR MANDIR VIA RAMPADA SAHOO |
42113 |
PIPELINE AT MOUZA KALABERIA FROM THE HOUSE OF SUBAL MANDAL TO ANUKUL THAKUR MANDIR VIA RAMPADA SAHOO1 |
Completion of work |
-
latitude : 22.0582562,22.0582562
Longitude : 87.7796093,87.7796093
file name : Image_21062023172212828.png
|
2023-06-21 17:22:12.897222 |
440 |
88972324 |
UPGRADATION OF CONCRETE ROAD AT MOUZA GUMKIA FROM THE HOUSE OF BASUDEV KAMILA TO THE HOUSE OF SHAKTI |
183901 |
UPGRADATION OF CONCRETE ROAD AT MOUZA GUMKIA FROM THE HOUSE OF BASUDEV KAMILA TO THE HOUSE OF SHAKTI1 |
Roof laid |
-
latitude : 22.06255789,22.06255776
Longitude : 87.75317487,87.75317499
file name : Image_29122023145547751.png
|
2023-12-29 14:55:47.815638 |
441 |
88972324 |
UPGRADATION OF CONCRETE ROAD AT MOUZA GUMKIA FROM THE HOUSE OF BASUDEV KAMILA TO THE HOUSE OF SHAKTI |
183901 |
UPGRADATION OF CONCRETE ROAD AT MOUZA GUMKIA FROM THE HOUSE OF BASUDEV KAMILA TO THE HOUSE OF SHAKTI1 |
Plinth level |
-
latitude : 22.05478852,22.05478852
Longitude : 87.78035639,87.78035639
file name : Image_29122023145148993.png
|
2023-12-29 14:51:49.062829 |
442 |
88972324 |
UPGRADATION OF CONCRETE ROAD AT MOUZA GUMKIA FROM THE HOUSE OF BASUDEV KAMILA TO THE HOUSE OF SHAKTI |
183901 |
UPGRADATION OF CONCRETE ROAD AT MOUZA GUMKIA FROM THE HOUSE OF BASUDEV KAMILA TO THE HOUSE OF SHAKTI1 |
Completion of work |
-
latitude : 22.0618534,22.0618534
Longitude : 87.7533792,87.7533792
file name : Image_29122023144746823.png
|
2023-12-29 14:47:46.892787 |
443 |
56872639 |
CONCRETE ROAD AT MOUZA KALABERIA FROM THE HO OF SUKUMAR JANA TO THE HO RAMPADA PANDIT |
150000 |
CONCRETE ROAD AT MOUZA KALABERIA FROM THE HO OF SUKUMAR JANA TO THE HO RAMPADA PANDIT1 |
Roof laid |
-
latitude : 22.05776782,22.05779129
Longitude : 87.79330434,87.79337582
file name : Image_19072023133642128.png
|
2023-07-19 13:36:42.200411 |
444 |
56872639 |
CONCRETE ROAD AT MOUZA KALABERIA FROM THE HO OF SUKUMAR JANA TO THE HO RAMPADA PANDIT |
150000 |
CONCRETE ROAD AT MOUZA KALABERIA FROM THE HO OF SUKUMAR JANA TO THE HO RAMPADA PANDIT1 |
Plinth level |
-
latitude : 22.05746763,22.05748742
Longitude : 87.79375814,87.79378059
file name : Image_19072023132355739.png
|
2023-07-19 13:23:55.805801 |
445 |
56872639 |
CONCRETE ROAD AT MOUZA KALABERIA FROM THE HO OF SUKUMAR JANA TO THE HO RAMPADA PANDIT |
150000 |
CONCRETE ROAD AT MOUZA KALABERIA FROM THE HO OF SUKUMAR JANA TO THE HO RAMPADA PANDIT1 |
Completion of work |
-
latitude : 22.05745883,22.05746769
Longitude : 87.79382554,87.79382634
file name : Image_19072023131550544.png
|
2023-07-19 13:15:50.665456 |
446 |
56873097 |
ROAD REPAIR AT MOUZA KOTEBARH FROM THE HO JANEALAM MALLIK TO THEWALL OF SHYAMAL PRADHAN VIA AKBAR MD |
200000 |
ROAD REPAIR AT MOUZA KOTEBARH FROM THE HO JANEALAM MALLIK TO THEWALL OF SHYAMAL PRADHAN VIA AKBAR MD1 |
Roof laid |
-
latitude : 22.0464064,22.0457586
Longitude : 87.78555705,87.7858319
file name : Image_19092023163455124.png
|
2023-09-19 16:34:55.178493 |
447 |
56873097 |
ROAD REPAIR AT MOUZA KOTEBARH FROM THE HO JANEALAM MALLIK TO THEWALL OF SHYAMAL PRADHAN VIA AKBAR MD |
200000 |
ROAD REPAIR AT MOUZA KOTEBARH FROM THE HO JANEALAM MALLIK TO THEWALL OF SHYAMAL PRADHAN VIA AKBAR MD1 |
Plinth level |
-
latitude : 22.045786,22.045786
Longitude : 87.7858244,87.7858244
file name : Image_16082023135107409.png
|
2023-08-16 13:51:07.476694 |
448 |
56873097 |
ROAD REPAIR AT MOUZA KOTEBARH FROM THE HO JANEALAM MALLIK TO THEWALL OF SHYAMAL PRADHAN VIA AKBAR MD |
200000 |
ROAD REPAIR AT MOUZA KOTEBARH FROM THE HO JANEALAM MALLIK TO THEWALL OF SHYAMAL PRADHAN VIA AKBAR MD1 |
Plinth level |
-
latitude : 22.0466848,22.0466848
Longitude : 87.7851515,87.7851515
file name : Image_19092023162718230.png
|
2023-09-19 16:27:18.289895 |
449 |
56873097 |
ROAD REPAIR AT MOUZA KOTEBARH FROM THE HO JANEALAM MALLIK TO THEWALL OF SHYAMAL PRADHAN VIA AKBAR MD |
200000 |
ROAD REPAIR AT MOUZA KOTEBARH FROM THE HO JANEALAM MALLIK TO THEWALL OF SHYAMAL PRADHAN VIA AKBAR MD1 |
Completion of work |
-
latitude : 22.0457572,22.0457876
Longitude : 87.7858391,87.7858249
file name : Image_16082023134233506.png
|
2023-08-16 13:42:33.574524 |
450 |
56549486 |
CONSTRUCTION OF SLUB CULVERT AT MOUZA DAYALCHAK |
199939 |
CONSTRUCTION OF SLUB CULVERT AT MOUZA DAYALCHAK1 |
Roof laid |
-
latitude : 22.02311812
Longitude : 87.7543231
file name : Image_26092023143640261.png
|
2023-09-26 14:36:40.323041 |
451 |
56549486 |
CONSTRUCTION OF SLUB CULVERT AT MOUZA DAYALCHAK |
199939 |
CONSTRUCTION OF SLUB CULVERT AT MOUZA DAYALCHAK1 |
Plinth level |
-
latitude : 22.02307316
Longitude : 87.75428458
file name : Image_26092023143124269.png
|
2023-09-26 14:31:24.335038 |
452 |
56549486 |
CONSTRUCTION OF SLUB CULVERT AT MOUZA DAYALCHAK |
199939 |
CONSTRUCTION OF SLUB CULVERT AT MOUZA DAYALCHAK1 |
Completion of work |
-
latitude : 22.02314197
Longitude : 87.75433957
file name : Image_26092023142628206.png
|
2023-09-26 14:26:28.268887 |
453 |
56582424 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA BALARAMCHAK NEAR THE HOUSE OF BISWAJIT SAMANTA |
199999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA BALARAMCHAK NEAR THE HOUSE OF BISWAJIT SAMANTA1 |
Roof laid |
-
latitude : 22.04997077
Longitude : 87.76053511
file name : Image_27092023134414431.png
|
2023-09-27 13:44:14.559637 |
454 |
56582424 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA BALARAMCHAK NEAR THE HOUSE OF BISWAJIT SAMANTA |
199999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA BALARAMCHAK NEAR THE HOUSE OF BISWAJIT SAMANTA1 |
Plinth level |
-
latitude : 22.04995727
Longitude : 87.76049199
file name : Image_27092023133249118.png
|
2023-09-27 13:32:49.371099 |
455 |
56582424 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA BALARAMCHAK NEAR THE HOUSE OF BISWAJIT SAMANTA |
199999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA BALARAMCHAK NEAR THE HOUSE OF BISWAJIT SAMANTA1 |
Plinth level |
-
latitude : 22.04999293
Longitude : 87.7604918
file name : Image_15062023134058588.png
|
2023-06-15 13:40:58.648766 |
456 |
56582424 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA BALARAMCHAK NEAR THE HOUSE OF BISWAJIT SAMANTA |
199999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA BALARAMCHAK NEAR THE HOUSE OF BISWAJIT SAMANTA1 |
Plinth level |
-
latitude : 22.05009935
Longitude : 87.76070749
file name : Image_13062023162240495.png
|
2023-06-13 16:22:40.554991 |
457 |
56582424 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA BALARAMCHAK NEAR THE HOUSE OF BISWAJIT SAMANTA |
199999 |
TUBEWELL WITH SUBMERSHIBLE PUMP AT MOUZA BALARAMCHAK NEAR THE HOUSE OF BISWAJIT SAMANTA1 |
Completion of work |
-
latitude : 22.04999014
Longitude : 87.76053092
file name : Image_13062023161237180.png
|
2023-06-13 16:12:37.246903 |
458 |
47482367 |
Constuction of new pipe culvert at mouza Deuribarh near Annapurna Karkhana |
200000 |
Constuction of new pipe culvert at mouza Deuribarh near Annapurna Karkhana1 |
Roof laid |
-
latitude : 22.01272262,22.01272159
Longitude : 87.74757722,87.74757755
file name : Image_07112023163726979.png
|
2023-11-07 16:37:27.091864 |
459 |
47482367 |
Constuction of new pipe culvert at mouza Deuribarh near Annapurna Karkhana |
200000 |
Constuction of new pipe culvert at mouza Deuribarh near Annapurna Karkhana1 |
Plinth level |
-
latitude : 22.01270103,22.01270451
Longitude : 87.74760213,87.74758602
file name : Image_07112023163046848.png
|
2023-11-07 16:30:47.141675 |
460 |
47482367 |
Constuction of new pipe culvert at mouza Deuribarh near Annapurna Karkhana |
200000 |
Constuction of new pipe culvert at mouza Deuribarh near Annapurna Karkhana1 |
Plinth level |
-
latitude : 22.01268966,22.0126997
Longitude : 87.74759224,87.74758957
file name : Image_07112023162853072.png
|
2023-11-07 16:28:51.931165 |
461 |
47482367 |
Constuction of new pipe culvert at mouza Deuribarh near Annapurna Karkhana |
200000 |
Constuction of new pipe culvert at mouza Deuribarh near Annapurna Karkhana1 |
Completion of work |
-
latitude : 22.01266721,22.01260148
Longitude : 87.74758964,87.74756485
file name : Image_07112023162418587.png
|
2023-11-07 16:24:18.564262 |
462 |
47482367 |
Constuction of new pipe culvert at mouza Deuribarh near Annapurna Karkhana |
200000 |
Constuction of new pipe culvert at mouza Deuribarh near Annapurna Karkhana1 |
Completion of work |
-
latitude : 22.01265798,22.01261118
Longitude : 87.74752135,87.74758178
file name : Image_07112023160852956.png
|
2023-11-07 16:08:53.221761 |
463 |
68256908 |
Construction of roads |
193883 |
Construction of roads1 |
Roof laid |
-
latitude : 22.0599969,22.0599969
Longitude : 87.78108445,87.78108445
file name : Image_02012024162408147.png
|
2024-01-02 16:24:08.21435 |
464 |
68256908 |
Construction of roads |
193883 |
Construction of roads1 |
Plinth level |
-
latitude : 22.06010002,22.06012191
Longitude : 87.78159756,87.78159895
file name : Image_02012024162102686.png
|
2024-01-02 16:21:02.750656 |
465 |
68256908 |
Construction of roads |
193883 |
Construction of roads1 |
Completion of work |
-
latitude : 22.05991197,22.06000383
Longitude : 87.78158328,87.78166948
file name : Image_02012024161721737.png
|
2024-01-02 16:17:21.804625 |
466 |
68262578 |
Piped water supply to HH |
85000 |
Piped water supply to HH1 |
Roof laid |
-
latitude : 22.00985414,22.00985414
Longitude : 87.76464873,87.76464873
file name : Image_18042024172551256.png
|
2024-04-18 17:25:51.323506 |
467 |
68262578 |
Piped water supply to HH |
85000 |
Piped water supply to HH1 |
Plinth level |
-
latitude : 22.00985414,22.00985414
Longitude : 87.76464873,87.76464873
file name : Image_18042024170807683.png
|
2024-04-18 17:08:07.750563 |
468 |
68262578 |
Piped water supply to HH |
85000 |
Piped water supply to HH1 |
Completion of work |
-
latitude : 22.00985414,22.00985414
Longitude : 87.76464873,87.76464873
file name : Image_18042024170316648.png
|
2024-04-18 17:03:16.732921 |
469 |
88598992 |
Greywater management system |
54412 |
Greywater management system1 |
Roof laid |
-
latitude : 22.0437645
Longitude : 87.78733076
file name : Image_11012024131318658.png
|
2024-01-11 13:13:18.722342 |
470 |
88598992 |
Greywater management system |
54412 |
Greywater management system1 |
Plinth level |
-
latitude : 22.0435645
Longitude : 87.78725286
file name : Image_11012024130932763.png
|
2024-01-11 13:09:32.838279 |
471 |
88598992 |
Greywater management system |
54412 |
Greywater management system1 |
Completion of work |
-
latitude : 22.04351416
Longitude : 87.78715791
file name : Image_11012024130543311.png
|
2024-01-11 13:05:43.385102 |
472 |
68489091 |
Creation of drainage channel for management of grey water |
303032 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.045919
Longitude : 87.779861
file name : Image_25012024130212619.png
|
2024-01-25 13:02:12.695893 |
473 |
68489091 |
Creation of drainage channel for management of grey water |
303032 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.0458865
Longitude : 87.7799324
file name : Image_11012024145629913.png
|
2024-01-11 14:56:29.985026 |
474 |
68489091 |
Creation of drainage channel for management of grey water |
303032 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.0458865
Longitude : 87.7799321
file name : Image_11012024144938008.png
|
2024-01-11 14:49:38.079584 |
475 |
56635813 |
CONCRETE DRAIN AT MOUZA KOTEBARH FROM THE HOUSER OF SK AZIZ TO THE HO SK TAIYAB |
302849 |
CONCRETE DRAIN AT MOUZA KOTEBARH FROM THE HOUSER OF SK AZIZ TO THE HO SK TAIYAB1 |
Roof laid |
-
latitude : 22.0460808,22.0460808
Longitude : 87.7792448,87.7792448
file name : Image_25012024125329000.png
|
2024-01-25 12:53:29.083694 |
476 |
56635813 |
CONCRETE DRAIN AT MOUZA KOTEBARH FROM THE HOUSER OF SK AZIZ TO THE HO SK TAIYAB |
302849 |
CONCRETE DRAIN AT MOUZA KOTEBARH FROM THE HOUSER OF SK AZIZ TO THE HO SK TAIYAB1 |
Plinth level |
-
latitude : 22.0458866,22.0458866
Longitude : 87.77994,87.77994
file name : Image_11012024150810788.png
|
2024-01-11 15:08:10.864526 |
477 |
56635813 |
CONCRETE DRAIN AT MOUZA KOTEBARH FROM THE HOUSER OF SK AZIZ TO THE HO SK TAIYAB |
302849 |
CONCRETE DRAIN AT MOUZA KOTEBARH FROM THE HOUSER OF SK AZIZ TO THE HO SK TAIYAB1 |
Completion of work |
-
latitude : 22.0458861,22.0458959
Longitude : 87.7799391,87.7799233
file name : Image_11012024150058477.png
|
2024-01-11 15:00:58.543834 |
478 |
56635663 |
CONCRETE DRAIN AT MOUZA KOTEBARH20 FROM THE HOUSE MAHATABUDDIN TO THE HO SAFIUR RAHAMAN |
153821 |
CONCRETE DRAIN AT MOUZA KOTEBARH20 FROM THE HOUSE MAHATABUDDIN TO THE HO SAFIUR RAHAMAN1 |
Roof laid |
-
latitude : 22.0468647,22.0468647,22.0468647
Longitude : 87.778629,87.778629,87.778629
file name : Image_11012024134451952.png
|
2024-01-11 13:44:52.01828 |
479 |
56635663 |
CONCRETE DRAIN AT MOUZA KOTEBARH20 FROM THE HOUSE MAHATABUDDIN TO THE HO SAFIUR RAHAMAN |
153821 |
CONCRETE DRAIN AT MOUZA KOTEBARH20 FROM THE HOUSE MAHATABUDDIN TO THE HO SAFIUR RAHAMAN1 |
Plinth level |
-
latitude : 22.0468617,22.046874
Longitude : 87.7786274,87.7786164
file name : Image_11012024133953966.png
|
2024-01-11 13:39:54.032508 |
480 |
56635663 |
CONCRETE DRAIN AT MOUZA KOTEBARH20 FROM THE HOUSE MAHATABUDDIN TO THE HO SAFIUR RAHAMAN |
153821 |
CONCRETE DRAIN AT MOUZA KOTEBARH20 FROM THE HOUSE MAHATABUDDIN TO THE HO SAFIUR RAHAMAN1 |
Completion of work |
-
latitude : 22.0468939,22.0468939
Longitude : 87.7785992,87.7785992
file name : Image_11012024133609789.png
|
2024-01-11 13:36:09.866132 |
481 |
68257110 |
Construction of roads |
193734 |
Construction of roads1 |
Roof laid |
-
latitude : 22.05025893,22.05009701
Longitude : 87.77289303,87.77267292
file name : Image_17012024144226186.png
|
2024-01-17 14:42:26.250233 |
482 |
68257110 |
Construction of roads |
193734 |
Construction of roads1 |
Plinth level |
-
latitude : 22.05058174,22.05025442
Longitude : 87.77231998,87.77286432
file name : Image_17012024143710210.png
|
2024-01-17 14:37:10.275842 |
483 |
68257110 |
Construction of roads |
193734 |
Construction of roads1 |
Completion of work |
-
latitude : 22.05051434,22.05018735,22.05017917
Longitude : 87.77300559,87.77290088,87.77285544
file name : Image_17012024143216406.png
|
2024-01-17 14:32:16.473062 |
484 |
56635495 |
TUBEWELL WITH SUBMERSHIBLE UMP AT MOUZA KOTEBARH20 NEAR THE HOUSE OF SK SERAJUL BABU |
199999 |
TUBEWELL WITH SUBMERSHIBLE UMP AT MOUZA KOTEBARH20 NEAR THE HOUSE OF SK SERAJUL BABU1 |
Completion of work |
-
latitude : 22.04808698
Longitude : 87.78045867
file name : Image_17032023173204305.png
|
2023-03-17 17:32:04.37894 |
485 |
56635495 |
TUBEWELL WITH SUBMERSHIBLE UMP AT MOUZA KOTEBARH20 NEAR THE HOUSE OF SK SERAJUL BABU |
199999 |
TUBEWELL WITH SUBMERSHIBLE UMP AT MOUZA KOTEBARH20 NEAR THE HOUSE OF SK SERAJUL BABU1 |
Plinth level |
-
latitude : 22.04812927
Longitude : 87.7804258
file name : Image_17032023173439351.png
|
2023-03-17 17:34:39.421016 |
486 |
56635495 |
TUBEWELL WITH SUBMERSHIBLE UMP AT MOUZA KOTEBARH20 NEAR THE HOUSE OF SK SERAJUL BABU |
199999 |
TUBEWELL WITH SUBMERSHIBLE UMP AT MOUZA KOTEBARH20 NEAR THE HOUSE OF SK SERAJUL BABU1 |
Roof laid |
-
latitude : 22.04811313
Longitude : 87.78042302
file name : Image_17032023173746918.png
|
2023-03-17 17:37:46.975511 |
487 |
88255393 |
Construction of Community Sanitary Complex |
149933 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 22.06053573
Longitude : 87.78802003
file name : Image_05122023154936190.png
|
2023-12-05 15:49:36.278999 |
488 |
88255393 |
Construction of Community Sanitary Complex |
149933 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 22.06031362
Longitude : 87.78796609
file name : Image_05122023154249813.png
|
2023-12-05 15:42:50.008105 |
489 |
88255393 |
Construction of Community Sanitary Complex |
149933 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 22.06040052
Longitude : 87.78798867
file name : Image_05122023153429563.png
|
2023-12-05 15:34:32.267692 |
490 |
68463992 |
Pipeline connection for water supply to all houses |
70000 |
Pipeline connection for water supply to all houses1 |
Roof laid |
-
latitude : 22.03866757
Longitude : 87.76987271
file name : Image_28122023153856350.png
|
2023-12-28 15:38:56.415263 |
491 |
68463992 |
Pipeline connection for water supply to all houses |
70000 |
Pipeline connection for water supply to all houses1 |
Plinth level |
-
latitude : 22.0384285
Longitude : 87.7697994
file name : Image_28122023153412261.png
|
2023-12-28 15:34:12.340273 |
492 |
68463992 |
Pipeline connection for water supply to all houses |
70000 |
Pipeline connection for water supply to all houses1 |
Completion of work |
-
latitude : 22.05902511
Longitude : 87.77525966
file name : Image_28122023152222531.png
|
2023-12-28 15:22:22.614199 |
493 |
68463992 |
Pipeline connection for water supply to all houses |
70000 |
Pipeline connection for water supply to all houses1 |
Completion of work |
-
latitude : 22.0364543
Longitude : 87.7693009
file name : Image_12122023141131300.png
|
2023-12-12 14:11:31.378286 |
494 |
68256772 |
Construction of roads |
194085 |
Construction of roads1 |
Roof laid |
-
latitude : 22.03380338,22.03382685,22.03381097
Longitude : 87.76978086,87.76980465,87.76980473
file name : Image_12122023140647866.png
|
2023-12-12 14:06:47.950865 |
495 |
68256772 |
Construction of roads |
194085 |
Construction of roads1 |
Plinth level |
-
latitude : 22.03377285,22.03377291
Longitude : 87.76984237,87.76984238
file name : Image_12122023140232760.png
|
2023-12-12 14:02:32.837862 |
496 |
68256772 |
Construction of roads |
194085 |
Construction of roads1 |
Plinth level |
-
latitude : 22.03375594,22.03377208
Longitude : 87.76987159,87.76986976
file name : Image_12122023135607434.png
|
2023-12-12 13:56:07.505994 |
497 |
68256772 |
Construction of roads |
194085 |
Construction of roads1 |
Completion of work |
-
latitude : 22.03380638,22.03380513
Longitude : 87.7697721,87.76977524
file name : Image_12122023134852823.png
|
2023-12-12 13:48:52.886404 |
498 |
56869554 |
CONCRETE ROAD AT MOUZA ASHUTIA FROM THE HO BULU MIRDDA TO THE CULVERT |
150000 |
CONCRETE ROAD AT MOUZA ASHUTIA FROM THE HO BULU MIRDDA TO THE CULVERT1 |
Roof laid |
-
latitude : 22.03115503,22.03115501,22.03115502
Longitude : 87.76496235,87.76496229,87.76496231
file name : Image_12122023142946886.png
|
2023-12-12 14:29:46.968676 |
499 |
56869554 |
CONCRETE ROAD AT MOUZA ASHUTIA FROM THE HO BULU MIRDDA TO THE CULVERT |
150000 |
CONCRETE ROAD AT MOUZA ASHUTIA FROM THE HO BULU MIRDDA TO THE CULVERT1 |
Plinth level |
-
latitude : 22.03118178,22.03118183
Longitude : 87.7649224,87.76492232
file name : Image_12122023142400761.png
|
2023-12-12 14:24:00.839352 |
500 |
56869554 |
CONCRETE ROAD AT MOUZA ASHUTIA FROM THE HO BULU MIRDDA TO THE CULVERT |
150000 |
CONCRETE ROAD AT MOUZA ASHUTIA FROM THE HO BULU MIRDDA TO THE CULVERT1 |
Completion of work |
-
latitude : 22.0300113,22.0300113
Longitude : 87.7644205,87.7644205
file name : Image_12122023141722003.png
|
2023-12-12 14:17:22.087142 |
501 |
68256661 |
Construction of roads |
193353 |
Construction of roads1 |
Roof laid |
-
latitude : 22.01925406,22.01925406
Longitude : 87.74981934,87.74981934
file name : Image_21122023153100491.png
|
2023-12-21 15:31:00.565834 |
502 |
68256661 |
Construction of roads |
193353 |
Construction of roads1 |
Plinth level |
-
latitude : 22.0196521,22.0196521
Longitude : 87.749884,87.749884
file name : Image_21122023152326169.png
|
2023-12-21 15:23:26.235721 |
503 |
68256661 |
Construction of roads |
193353 |
Construction of roads1 |
Plinth level |
-
latitude : 22.0196777,22.0196618
Longitude : 87.7498647,87.749878
file name : Image_21122023151654645.png
|
2023-12-21 15:16:54.712569 |
504 |
68256661 |
Construction of roads |
193353 |
Construction of roads1 |
Completion of work |
-
latitude : 22.0196449,22.01934051
Longitude : 87.7498826,87.74941832
file name : Image_21122023150114504.png
|
2023-12-21 15:01:14.576204 |
505 |
68256738 |
Construction of roads |
194085 |
Construction of roads1 |
Roof laid |
-
latitude : 22.01172517,22.01172516
Longitude : 87.75884518,87.75884468
file name : Image_22122023130353792.png
|
2023-12-22 13:03:53.868051 |
506 |
68256738 |
Construction of roads |
194085 |
Construction of roads1 |
Plinth level |
-
latitude : 22.01177862,22.01173339
Longitude : 87.75885839,87.75883733
file name : Image_22122023130023032.png
|
2023-12-22 13:00:23.108376 |
507 |
68256738 |
Construction of roads |
194085 |
Construction of roads1 |
Completion of work |
-
latitude : 22.01164141,22.01168357
Longitude : 87.75856539,87.75845452
file name : Image_21122023131230949.png
|
2023-12-21 13:12:31.021637 |
508 |
56630338 |
COMMUNITY TOILET AT MOUZA KOTEBARH 16 NEAR TEEN RASTAR MORE |
199954 |
COMMUNITY TOILET AT MOUZA KOTEBARH 16 NEAR TEEN RASTAR MORE1 |
Roof laid |
-
latitude : 22.05156378
Longitude : 87.78578868
file name : Image_21122023143836988.png
|
2023-12-21 14:38:37.099823 |
509 |
56630338 |
COMMUNITY TOILET AT MOUZA KOTEBARH 16 NEAR TEEN RASTAR MORE |
199954 |
COMMUNITY TOILET AT MOUZA KOTEBARH 16 NEAR TEEN RASTAR MORE1 |
Plinth level |
-
latitude : 22.05160506
Longitude : 87.7857367
file name : Image_21122023143201820.png
|
2023-12-21 14:32:01.923538 |
510 |
56630338 |
COMMUNITY TOILET AT MOUZA KOTEBARH 16 NEAR TEEN RASTAR MORE |
199954 |
COMMUNITY TOILET AT MOUZA KOTEBARH 16 NEAR TEEN RASTAR MORE1 |
Completion of work |
-
latitude : 22.05158715
Longitude : 87.78575893
file name : Image_21122023141806853.png
|
2023-12-21 14:18:06.931001 |
511 |
56630338 |
COMMUNITY TOILET AT MOUZA KOTEBARH 16 NEAR TEEN RASTAR MORE |
199954 |
COMMUNITY TOILET AT MOUZA KOTEBARH 16 NEAR TEEN RASTAR MORE1 |
Completion of work |
-
latitude : 22.05161353
Longitude : 87.78577328
file name : Image_21122023140936735.png
|
2023-12-21 14:09:36.814417 |
512 |
68493203 |
Purchase of water testing kit |
150000 |
Purchase of water testing kit1 |
|
-
latitude : 22.00979368
Longitude : 87.76518862
file name : Image_21122023160114856.png
|
2023-12-21 16:01:14.929074 |
513 |
68256969 |
Construction of roads |
256515 |
Construction of roads1 |
Roof laid |
-
latitude : 22.05752199,22.05753269
Longitude : 87.79380704,87.79405955
file name : Image_22122023160305493.png
|
2023-12-22 16:03:05.577173 |
514 |
68256969 |
Construction of roads |
256515 |
Construction of roads1 |
Plinth level |
-
latitude : 22.05755555,22.05753989,22.05753983
Longitude : 87.7937154,87.79373831,87.79373485
file name : Image_22122023155902067.png
|
2023-12-22 15:59:02.130764 |
515 |
68256969 |
Construction of roads |
256515 |
Construction of roads1 |
Completion of work |
-
latitude : 22.05757331,22.05754898
Longitude : 87.79356241,87.79356797
file name : Image_22122023155452871.png
|
2023-12-22 15:54:52.951423 |
516 |
56628559 |
COMMUNITY TOILET AT MOUZA SU CHARABARH NEAR NIMTALA ICDS CENTRE |
199954 |
COMMUNITY TOILET AT MOUZA SU CHARABARH NEAR NIMTALA ICDS CENTRE1 |
Roof laid |
-
latitude : 22.05578987
Longitude : 87.76944551
file name : Image_01032024123012821.png
|
2024-03-01 12:30:12.938091 |
517 |
56628559 |
COMMUNITY TOILET AT MOUZA SU CHARABARH NEAR NIMTALA ICDS CENTRE |
199954 |
COMMUNITY TOILET AT MOUZA SU CHARABARH NEAR NIMTALA ICDS CENTRE1 |
Plinth level |
-
latitude : 22.05578987
Longitude : 87.76944551
file name : Image_01032024121037849.png
|
2024-03-01 12:10:37.932567 |
518 |
56628559 |
COMMUNITY TOILET AT MOUZA SU CHARABARH NEAR NIMTALA ICDS CENTRE |
199954 |
COMMUNITY TOILET AT MOUZA SU CHARABARH NEAR NIMTALA ICDS CENTRE1 |
Completion of work |
-
latitude : 22.05604703
Longitude : 87.76922989
file name : Image_01032024120227246.png
|
2024-03-01 12:02:27.316362 |
519 |
68493875 |
Operation and Maintenance of drinking water supply system |
168230 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 22.02001002
Longitude : 87.75314626
file name : Image_22082024110327403.png
|
2024-08-22 11:03:27.465593 |
520 |
68493875 |
Operation and Maintenance of drinking water supply system |
168230 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 22.02000368
Longitude : 87.75314582
file name : Image_22082024105914836.png
|
2024-08-22 10:59:14.909441 |
521 |
68493875 |
Operation and Maintenance of drinking water supply system |
168230 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 22.01991604
Longitude : 87.75313552
file name : Image_22082024105218910.png
|
2024-08-22 10:52:18.980064 |
522 |
88598970 |
Greywater management system |
54412 |
Greywater management system1 |
Roof laid |
-
latitude : 22.03148152
Longitude : 87.76764347
file name : Image_01032024125754927.png
|
2024-03-01 12:57:55.03162 |
523 |
88598970 |
Greywater management system |
54412 |
Greywater management system1 |
Plinth level |
-
latitude : 22.03148902
Longitude : 87.76773521
file name : Image_01032024125504143.png
|
2024-03-01 12:55:04.2417 |
524 |
88598970 |
Greywater management system |
54412 |
Greywater management system1 |
Plinth level |
-
latitude : 22.0314855
Longitude : 87.76738805
file name : Image_01032024125104170.png
|
2024-03-01 12:51:04.24199 |
525 |
88598970 |
Greywater management system |
54412 |
Greywater management system1 |
Completion of work |
-
latitude : 22.03161704
Longitude : 87.76752176
file name : Image_01032024124759935.png
|
2024-03-01 12:48:00.028473 |
526 |
88598954 |
Greywater management system |
54412 |
Greywater management system1 |
Roof laid |
-
latitude : 22.02385225
Longitude : 87.75683711
file name : Image_01032024131717715.png
|
2024-03-01 13:17:17.816862 |
527 |
88598954 |
Greywater management system |
54412 |
Greywater management system1 |
Plinth level |
-
latitude : 22.02396757
Longitude : 87.7569462
file name : Image_01032024131135689.png
|
2024-03-01 13:11:35.785104 |
528 |
88598954 |
Greywater management system |
54412 |
Greywater management system1 |
Completion of work |
-
latitude : 22.02384888
Longitude : 87.75685642
file name : Image_01032024130535127.png
|
2024-03-01 13:05:35.201646 |
529 |
56551987 |
COMMUNITY TOILET AT MOUZA SUKRULLAPUR NEAR THE GROUND OF VIVEKANANDA SANGHA |
199954 |
COMMUNITY TOILET AT MOUZA SUKRULLAPUR NEAR THE GROUND OF VIVEKANANDA SANGHA1 |
Roof laid |
-
latitude : 22.00985615
Longitude : 87.7655903
file name : Image_11032024130535326.png
|
2024-03-11 13:05:35.414106 |
530 |
56551987 |
COMMUNITY TOILET AT MOUZA SUKRULLAPUR NEAR THE GROUND OF VIVEKANANDA SANGHA |
199954 |
COMMUNITY TOILET AT MOUZA SUKRULLAPUR NEAR THE GROUND OF VIVEKANANDA SANGHA1 |
Roof laid |
-
latitude : 22.00650542
Longitude : 87.77731328
file name : Image_02032024162450537.png
|
2024-03-02 16:24:50.618544 |
531 |
56551987 |
COMMUNITY TOILET AT MOUZA SUKRULLAPUR NEAR THE GROUND OF VIVEKANANDA SANGHA |
199954 |
COMMUNITY TOILET AT MOUZA SUKRULLAPUR NEAR THE GROUND OF VIVEKANANDA SANGHA1 |
Plinth level |
-
latitude : 22.00650542
Longitude : 87.77731328
file name : Image_02032024162051500.png
|
2024-03-02 16:20:51.58475 |
532 |
56551987 |
COMMUNITY TOILET AT MOUZA SUKRULLAPUR NEAR THE GROUND OF VIVEKANANDA SANGHA |
199954 |
COMMUNITY TOILET AT MOUZA SUKRULLAPUR NEAR THE GROUND OF VIVEKANANDA SANGHA1 |
Completion of work |
-
latitude : 22.00650542
Longitude : 87.77731328
file name : Image_02032024161550278.png
|
2024-03-02 16:15:50.358532 |
533 |
68494483 |
Construction of toilets in public institutions |
101906 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 22.0555428
Longitude : 87.7788943
file name : Image_27042024161749507.png
|
2024-04-27 16:17:49.590725 |
534 |
68494483 |
Construction of toilets in public institutions |
101906 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 22.0555396
Longitude : 87.7788899
file name : Image_27042024161521313.png
|
2024-04-27 16:15:21.386782 |
535 |
56630195 |
SLAB CULVERT AT MOUZA KALABERIA NEAR THE LAND OF RADHESHYAM BERA |
200000 |
SLAB CULVERT AT MOUZA KALABERIA NEAR THE LAND OF RADHESHYAM BERA1 |
Roof laid |
-
latitude : 22.05536193,22.05531983
Longitude : 87.79660445,87.79661161
file name : Image_03052024180250025.png
|
2024-05-03 18:02:50.102603 |
536 |
56630195 |
SLAB CULVERT AT MOUZA KALABERIA NEAR THE LAND OF RADHESHYAM BERA |
200000 |
SLAB CULVERT AT MOUZA KALABERIA NEAR THE LAND OF RADHESHYAM BERA1 |
Plinth level |
-
latitude : 22.05533965,22.05532085
Longitude : 87.79662709,87.79661747
file name : Image_03052024175717796.png
|
2024-05-03 17:57:17.86073 |
537 |
56630195 |
SLAB CULVERT AT MOUZA KALABERIA NEAR THE LAND OF RADHESHYAM BERA |
200000 |
SLAB CULVERT AT MOUZA KALABERIA NEAR THE LAND OF RADHESHYAM BERA1 |
Completion of work |
-
latitude : 22.05533411,22.05534044
Longitude : 87.7966485,87.79665258
file name : Image_03052024175206435.png
|
2024-05-03 17:52:06.512192 |
538 |
56581828 |
SLAB CULVERT AT MOUZA ASHUTIA NEAR THE HOUSE OF MADAN GUACHAIT |
200000 |
SLAB CULVERT AT MOUZA ASHUTIA NEAR THE HOUSE OF MADAN GUACHAIT1 |
Roof laid |
-
latitude : 22.03280627,22.0325695
Longitude : 87.76242692,87.76221963
file name : Image_11032024173500273.png
|
2024-03-11 17:35:00.346944 |
539 |
56581828 |
SLAB CULVERT AT MOUZA ASHUTIA NEAR THE HOUSE OF MADAN GUACHAIT |
200000 |
SLAB CULVERT AT MOUZA ASHUTIA NEAR THE HOUSE OF MADAN GUACHAIT1 |
Plinth level |
-
latitude : 22.03249941,22.03249941
Longitude : 87.76224596,87.76224596
file name : Image_11032024173156881.png
|
2024-03-11 17:31:56.965769 |
540 |
56581828 |
SLAB CULVERT AT MOUZA ASHUTIA NEAR THE HOUSE OF MADAN GUACHAIT |
200000 |
SLAB CULVERT AT MOUZA ASHUTIA NEAR THE HOUSE OF MADAN GUACHAIT1 |
Completion of work |
-
latitude : 22.05337894,22.03293475
Longitude : 87.77362484,87.76202509
file name : Image_11032024172717747.png
|
2024-03-11 17:27:17.829453 |
541 |
68465620 |
Drinking water facilities |
270000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 22.05821923
Longitude : 87.7778879
file name : Image_15032024100841960.png
|
2024-03-15 10:08:42.036326 |
542 |
68465620 |
Drinking water facilities |
270000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 22.05831634
Longitude : 87.77794553
file name : Image_15032024100425885.png
|
2024-03-15 10:04:25.977213 |
543 |
68465620 |
Drinking water facilities |
270000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 22.05831477
Longitude : 87.77784084
file name : Image_15032024095902201.png
|
2024-03-15 09:59:02.270625 |
544 |
68464586 |
Pipeline connection for water supply to all houses |
70000 |
Pipeline connection for water supply to all houses1 |
Roof laid |
-
latitude : 22.05142506
Longitude : 87.76253608
file name : Image_15032024094317858.png
|
2024-03-15 09:43:17.943477 |
545 |
68464586 |
Pipeline connection for water supply to all houses |
70000 |
Pipeline connection for water supply to all houses1 |
Plinth level |
-
latitude : 22.0514206
Longitude : 87.7616744
file name : Image_15032024093941722.png
|
2024-03-15 09:39:41.794178 |
546 |
68464586 |
Pipeline connection for water supply to all houses |
70000 |
Pipeline connection for water supply to all houses1 |
Completion of work |
-
latitude : 22.0514126
Longitude : 87.7616806
file name : Image_15032024093000708.png
|
2024-03-15 09:30:00.772899 |
547 |
68256592 |
Construction of roads |
250000 |
Upgradation to Concrete road at Mouza Manoharpur from Joydeb Sahoo Fisery to haripada Jana house |
Plinth level |
-
latitude : 22.00985414,22.00985414
Longitude : 87.76464873,87.76464873
file name : Image_23042024164017797.png
|
2024-04-23 16:40:17.868316 |
548 |
68256592 |
Construction of roads |
250000 |
Upgradation to Concrete road at Mouza Manoharpur from Joydeb Sahoo Fisery to haripada Jana house |
Completion of work |
-
latitude : 22.00985414,22.00985414
Longitude : 87.76464873,87.76464873
file name : Image_23042024163341566.png
|
2024-04-23 16:33:41.644022 |
549 |
92548715 |
Construction of roads |
206514 |
UPGRADATION OF CC ROAD AT MOUZA RAMCHAK FROM THE HOUSE OF ASISH PATTANAYAK TO AJAY MAITY HUSKING MILL |
Roof laid |
-
latitude : 22.039186,22.039186
Longitude : 87.7697564,87.7697564
file name : Image_28032024142105826.png
|
2024-03-28 14:21:05.907516 |
550 |
92548715 |
Construction of roads |
206514 |
UPGRADATION OF CC ROAD AT MOUZA RAMCHAK FROM THE HOUSE OF ASISH PATTANAYAK TO AJAY MAITY HUSKING MILL |
Plinth level |
-
latitude : 22.0391857,22.0391857
Longitude : 87.7697646,87.7697646
file name : Image_16032024171713868.png
|
2024-03-16 17:17:13.944524 |
551 |
92548715 |
Construction of roads |
206514 |
UPGRADATION OF CC ROAD AT MOUZA RAMCHAK FROM THE HOUSE OF ASISH PATTANAYAK TO AJAY MAITY HUSKING MILL |
Completion of work |
-
latitude : 22.03869958,22.03885464,22.03882668
Longitude : 87.76982381,87.76983196,87.76978374
file name : Image_16032024165908594.png
|
2024-03-16 16:59:08.667924 |
552 |
92547878 |
Construction of roads |
198725 |
Construction of roads1 |
Roof laid |
-
latitude : 22.00985414,22.00985414
Longitude : 87.76464873,87.76464873
file name : Image_25042024134151263.png
|
2024-04-25 13:41:51.324217 |
553 |
92547878 |
Construction of roads |
198725 |
Construction of roads1 |
Plinth level |
-
latitude : 22.00985414,22.00985414
Longitude : 87.76464873,87.76464873
file name : Image_25042024133755059.png
|
2024-04-25 13:37:55.124407 |
554 |
92547878 |
Construction of roads |
198725 |
Construction of roads1 |
Completion of work |
-
latitude : 22.00985414,22.00985414
Longitude : 87.76464873,87.76464873
file name : Image_25042024133320723.png
|
2024-04-25 13:33:20.799121 |
555 |
92547878 |
Construction of roads |
198725 |
Construction of roads1 |
Completion of work |
-
latitude : 22.0500327,22.0500327
Longitude : 87.77189574,87.77189574
file name : Image_16032024174042683.png
|
2024-03-16 17:40:42.755086 |
556 |
92550796 |
Construction of Community Sanitary Complex |
154500 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 22.04079716
Longitude : 87.76921788
file name : Image_16032024172327938.png
|
2024-03-16 17:23:28.009694 |
557 |
92547042 |
Construction of roads |
252600 |
Construction of roads1 |
Roof laid |
-
latitude : 22.00985414,22.00985414
Longitude : 87.76464873,87.76464873
file name : Image_25042024140838965.png
|
2024-04-25 14:08:39.365408 |
558 |
92547042 |
Construction of roads |
252600 |
Construction of roads1 |
Plinth level |
-
latitude : 22.00985414,22.00985414
Longitude : 87.76464873,87.76464873
file name : Image_25042024140529505.png
|
2024-04-25 14:05:29.575756 |
559 |
92547042 |
Construction of roads |
252600 |
Construction of roads1 |
Completion of work |
-
latitude : 22.05539168,22.05539168
Longitude : 87.77245244,87.77245244
file name : Image_16032024175338825.png
|
2024-03-16 17:53:38.894773 |
560 |
92548278 |
Construction of roads |
302066 |
Construction of roads1 |
Roof laid |
-
latitude : 22.03130248,22.03130248
Longitude : 87.76753065,87.76753065
file name : Image_28032024150829979.png
|
2024-03-28 15:08:30.066746 |
561 |
92548278 |
Construction of roads |
302066 |
Construction of roads1 |
Plinth level |
-
latitude : 22.03148216,22.03125081,22.03125081
Longitude : 87.76735711,87.76717742,87.76717742
file name : Image_28032024150319613.png
|
2024-03-28 15:03:19.858501 |
562 |
92548278 |
Construction of roads |
302066 |
Construction of roads1 |
Plinth level |
-
latitude : 22.03148216,22.03125081,22.03125081
Longitude : 87.76735711,87.76717742,87.76717742
file name : Image_28032024150102956.png
|
2024-03-28 15:01:03.063941 |
563 |
92548278 |
Construction of roads |
302066 |
Construction of roads1 |
Completion of work |
-
latitude : 22.03146043,22.03146006
Longitude : 87.76755922,87.76756176
file name : Image_27032024110942483.png
|
2024-03-27 11:09:42.569252 |
564 |
92531438 |
Creation of drainage channel for management of grey water |
203000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.06051644
Longitude : 87.78925716
file name : Image_15052024164118022.png
|
2024-05-15 16:41:18.108119 |
565 |
92531438 |
Creation of drainage channel for management of grey water |
203000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.06050267
Longitude : 87.78926844
file name : Image_15052024163811732.png
|
2024-05-15 16:38:11.796471 |
566 |
92531438 |
Creation of drainage channel for management of grey water |
203000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.0604975
Longitude : 87.78925028
file name : Image_15052024163252410.png
|
2024-05-15 16:32:52.472387 |
567 |
68503167 |
Repair of drainage channel |
150000 |
Repair of drainage channel1 |
Roof laid |
-
latitude : 22.04038733
Longitude : 87.78447773
file name : Image_18072024174513945.png
|
2024-07-18 17:45:14.016641 |
568 |
68503167 |
Repair of drainage channel |
150000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 22.04036225
Longitude : 87.7844787
file name : Image_18072024174214017.png
|
2024-07-18 17:42:14.095705 |
569 |
68503167 |
Repair of drainage channel |
150000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 22.04668605
Longitude : 87.77874363
file name : Image_18072024173400149.png
|
2024-07-18 17:34:00.219134 |
570 |
68467307 |
Pipeline connection for water supply to all houses |
70000 |
Pipeline connection for water supply to all houses1 |
Roof laid |
-
latitude : 22.06039988
Longitude : 87.78805592
file name : Image_22032024131814583.png
|
2024-03-22 13:18:14.677022 |
571 |
68467307 |
Pipeline connection for water supply to all houses |
70000 |
Pipeline connection for water supply to all houses1 |
Plinth level |
-
latitude : 22.06046269
Longitude : 87.78817585
file name : Image_22032024131245161.png
|
2024-03-22 13:12:45.238134 |
572 |
68467307 |
Pipeline connection for water supply to all houses |
70000 |
Pipeline connection for water supply to all houses1 |
Completion of work |
-
latitude : 22.06049049
Longitude : 87.78775989
file name : Image_22032024130258549.png
|
2024-03-22 13:02:58.620596 |
573 |
92546768 |
Construction of roads |
248569 |
Construction of roads1 |
Roof laid |
-
latitude : 22.05980366,22.05981405
Longitude : 87.76162575,87.76168801
file name : Image_27032024123423430.png
|
2024-03-27 12:34:23.520404 |
574 |
92546768 |
Construction of roads |
248569 |
Construction of roads1 |
Plinth level |
-
latitude : 22.06054685,22.06054519
Longitude : 87.76182221,87.7618233
file name : Image_27032024122943211.png
|
2024-03-27 12:29:44.012798 |
575 |
92546768 |
Construction of roads |
248569 |
Construction of roads1 |
Completion of work |
-
latitude : 22.05940522,22.05940522
Longitude : 87.76174876,87.76174876
file name : Image_27032024122232757.png
|
2024-03-27 12:22:32.885302 |
576 |
68256687 |
Construction of roads |
190000 |
Upgradation to Concrete road at Mouza Bhairabichak from Khitis Jana house to Rampada Barman |
Roof laid |
-
latitude : 22.01919645,22.01923357
Longitude : 87.77959396,87.77963242
file name : Image_27032024164729343.png
|
2024-03-27 16:47:29.426136 |
577 |
68256687 |
Construction of roads |
190000 |
Upgradation to Concrete road at Mouza Bhairabichak from Khitis Jana house to Rampada Barman |
Plinth level |
-
latitude : 22.01913755,22.01916257
Longitude : 87.77966466,87.7797472
file name : Image_27032024164217165.png
|
2024-03-27 16:42:17.287508 |
578 |
68256687 |
Construction of roads |
190000 |
Upgradation to Concrete road at Mouza Bhairabichak from Khitis Jana house to Rampada Barman |
Completion of work |
-
latitude : 22.01913403,22.01914397
Longitude : 87.77966551,87.77966312
file name : Image_27032024163409147.png
|
2024-03-27 16:34:09.316534 |
579 |
68467798 |
Pipeline connection for water supply to all houses |
90000 |
Spreding of pipeline at Mouza Chowdhunia from Monoranjan Das house to Bisnupada Maikap house |
Roof laid |
-
latitude : 22.03581665
Longitude : 87.78566792
file name : Image_31032024090237314.png
|
2024-03-31 09:02:37.385034 |
580 |
68467798 |
Pipeline connection for water supply to all houses |
90000 |
Spreding of pipeline at Mouza Chowdhunia from Monoranjan Das house to Bisnupada Maikap house |
Plinth level |
-
latitude : 22.03537098
Longitude : 87.78526036
file name : Image_31032024085731320.png
|
2024-03-31 08:57:31.395482 |
581 |
68467798 |
Pipeline connection for water supply to all houses |
90000 |
Spreding of pipeline at Mouza Chowdhunia from Monoranjan Das house to Bisnupada Maikap house |
Completion of work |
-
latitude : 22.03535478
Longitude : 87.78525058
file name : Image_31032024085446488.png
|
2024-03-31 08:54:46.559595 |
582 |
68257568 |
Repairing/Construction of Building |
350000 |
Repairing/Construction of Building1 |
Plinth level |
-
latitude : 22.0555444
Longitude : 87.7789436
file name : Image_09092024160348429.png
|
2024-09-09 16:03:48.507083 |
583 |
68257568 |
Repairing/Construction of Building |
350000 |
Repairing/Construction of Building1 |
Completion of work |
-
latitude : 22.055533
Longitude : 87.7789133
file name : Image_09092024155954013.png
|
2024-09-09 15:59:54.084838 |
584 |
68263125 |
Pipeline connection for water supply to all houses |
70000 |
Spreding of pipeline at mouza Deurbarh from Chandan Giri to Binoy Maity |
Roof laid |
-
latitude : 22.02253236,22.02253236
Longitude : 87.76343936,87.76343936
file name : Image_02042024120412604.png
|
2024-04-02 12:04:12.673096 |
585 |
68263125 |
Pipeline connection for water supply to all houses |
70000 |
Spreding of pipeline at mouza Deurbarh from Chandan Giri to Binoy Maity |
Plinth level |
-
latitude : 22.02234943,22.02231046
Longitude : 87.76291277,87.76271122
file name : Image_02042024120103064.png
|
2024-04-02 12:01:03.138043 |
586 |
68263125 |
Pipeline connection for water supply to all houses |
70000 |
Spreding of pipeline at mouza Deurbarh from Chandan Giri to Binoy Maity |
Completion of work |
-
latitude : 22.00992171,22.00992171
Longitude : 87.76498259,87.76498259
file name : Image_02042024115613046.png
|
2024-04-02 11:56:13.153535 |
587 |
68465408 |
Drinking water facility |
270000 |
Sinking of Tube Well with Submershible pump with sock pit at mouza Sucharabarh near the house of Rangalal |
Roof laid |
-
latitude : 22.05345898
Longitude : 87.76680141
file name : Image_29032024143607845.png
|
2024-03-29 14:36:07.918535 |
588 |
68465408 |
Drinking water facility |
270000 |
Sinking of Tube Well with Submershible pump with sock pit at mouza Sucharabarh near the house of Rangalal |
Plinth level |
-
latitude : 22.05344913
Longitude : 87.76693627
file name : Image_29032024143037032.png
|
2024-03-29 14:30:37.115972 |
589 |
68465408 |
Drinking water facility |
270000 |
Sinking of Tube Well with Submershible pump with sock pit at mouza Sucharabarh near the house of Rangalal |
Completion of work |
-
latitude : 22.05349466
Longitude : 87.76701901
file name : Image_29032024142211608.png
|
2024-03-29 14:22:11.689913 |
590 |
68467429 |
Pipeline connection for water supply to all houses |
70000 |
Pipeline connection for water supply to all houses1 |
Roof laid |
-
latitude : 22.0606303
Longitude : 87.7893765
file name : Image_29032024155545113.png
|
2024-03-29 15:55:45.18007 |
591 |
68467429 |
Pipeline connection for water supply to all houses |
70000 |
Pipeline connection for water supply to all houses1 |
Plinth level |
-
latitude : 22.05923045
Longitude : 87.78924785
file name : Image_29032024155134943.png
|
2024-03-29 15:51:35.033435 |
592 |
68467429 |
Pipeline connection for water supply to all houses |
70000 |
Pipeline connection for water supply to all houses1 |
Completion of work |
-
latitude : 22.05923928
Longitude : 87.78924917
file name : Image_29032024154544426.png
|
2024-03-29 15:45:44.504859 |
593 |
92384253 |
Creation of drainage channel for management of grey water |
204000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.05268852
Longitude : 87.75788013
file name : Image_18062024170316141.png
|
2024-06-18 17:03:16.223143 |
594 |
92384253 |
Creation of drainage channel for management of grey water |
204000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.05271044
Longitude : 87.75757923
file name : Image_18062024165138299.png
|
2024-06-18 16:51:38.365717 |
595 |
92384253 |
Creation of drainage channel for management of grey water |
204000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.01356971
Longitude : 87.75398014
file name : Image_18062024164401407.png
|
2024-06-18 16:44:01.491508 |
596 |
56630735 |
SLAB CULVERT AT MOUZA KALABERIA 16 NEAR THE FISHERY OF SOUMEN ROY |
200000 |
SLAB CULVERT AT MOUZA KALABERIA 16 NEAR THE FISHERY OF SOUMEN ROY1 |
Roof laid |
-
latitude : 22.05062111,22.05050473
Longitude : 87.79443562,87.79421452
file name : Image_18062024182737735.png
|
2024-06-18 18:27:37.804571 |
597 |
56630735 |
SLAB CULVERT AT MOUZA KALABERIA 16 NEAR THE FISHERY OF SOUMEN ROY |
200000 |
SLAB CULVERT AT MOUZA KALABERIA 16 NEAR THE FISHERY OF SOUMEN ROY1 |
Plinth level |
-
latitude : 22.05046287,22.0505335
Longitude : 87.79414349,87.79411038
file name : Image_18062024182426535.png
|
2024-06-18 18:24:26.602514 |
598 |
56630735 |
SLAB CULVERT AT MOUZA KALABERIA 16 NEAR THE FISHERY OF SOUMEN ROY |
200000 |
SLAB CULVERT AT MOUZA KALABERIA 16 NEAR THE FISHERY OF SOUMEN ROY1 |
Completion of work |
-
latitude : 22.0504738,22.05046847
Longitude : 87.79417382,87.7941551
file name : Image_18062024181816807.png
|
2024-06-18 18:18:16.903738 |
599 |
68465538 |
Pipeline connection for water supply to all houses |
58315 |
Pipeline connection for water supply to all houses1 |
Plinth level |
-
latitude : 22.05498585
Longitude : 87.76885755
file name : Image_29122023101211820.png
|
2023-12-29 10:12:11.889858 |
600 |
68465538 |
Pipeline connection for water supply to all houses |
58315 |
Pipeline connection for water supply to all houses1 |
Completion of work |
-
latitude : 22.05577422
Longitude : 87.76933263
file name : Image_29122023100831031.png
|
2023-12-29 10:08:31.103111 |
601 |
68740381 |
Pipeline connection for water supply to all houses |
50000 |
Pipeline connection for water supply to all houses1 |
Plinth level |
-
latitude : 22.02108806
Longitude : 87.75870117
file name : Image_24062024172711441.png
|
2024-06-24 17:27:11.527473 |
602 |
68740381 |
Pipeline connection for water supply to all houses |
50000 |
Pipeline connection for water supply to all houses1 |
Completion of work |
-
latitude : 22.02111588
Longitude : 87.75870254
file name : Image_24062024172144259.png
|
2024-06-24 17:21:44.337565 |
603 |
92530047 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.0578355
Longitude : 87.7797008
file name : Image_03072024135320384.png
|
2024-07-03 13:53:20.455127 |
604 |
92530047 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.0578349
Longitude : 87.7797011
file name : Image_03072024134833338.png
|
2024-07-03 13:48:33.407235 |
605 |
92530047 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.0578338
Longitude : 87.7796989
file name : Image_03072024133950648.png
|
2024-07-03 13:39:50.728658 |
606 |
92541405 |
Creation of a new source of drinking water |
210000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.0557247
Longitude : 87.7794883
file name : Image_16032024160650348.png
|
2024-03-16 16:06:50.424454 |
607 |
92541405 |
Creation of a new source of drinking water |
210000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.05577891
Longitude : 87.77903979
file name : Image_16032024160234272.png
|
2024-03-16 16:02:34.34517 |
608 |
89247828 |
Construction of roads |
290000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.06065085,22.06065414
Longitude : 87.76182118,87.7618229
file name : Image_01102024173939989.png
|
2024-10-01 17:39:40.072619 |
609 |
89247828 |
Construction of roads |
290000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.06151705,22.06153704
Longitude : 87.76197336,87.76200385
file name : Image_01102024172148952.png
|
2024-10-01 17:21:48.865828 |
610 |
89238706 |
Construction of roads |
195000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.0667084,22.06662891,22.06664628
Longitude : 87.75293416,87.75289643,87.75293313
file name : Image_01102024170623243.png
|
2024-10-01 17:06:23.318577 |
611 |
89238706 |
Construction of roads |
195000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.06665398,22.06668387
Longitude : 87.75283461,87.75286271
file name : Image_01102024164531737.png
|
2024-10-01 16:45:31.815981 |
612 |
68257010 |
Construction of roads |
193817 |
Upgradation to Concrete Road at Mouza Kotebarh from Debbrata Panda to Narayan Manna House |
Roof laid |
-
latitude : 22.05106315,22.05103469
Longitude : 87.78723636,87.78744911
file name : Image_27122023121508606.png
|
2023-12-27 12:15:08.678773 |
613 |
68257010 |
Construction of roads |
193817 |
Upgradation to Concrete Road at Mouza Kotebarh from Debbrata Panda to Narayan Manna House |
Plinth level |
-
latitude : 22.05082583,22.05082584
Longitude : 87.78811748,87.78811748
file name : Image_27122023121220482.png
|
2023-12-27 12:12:20.56677 |
614 |
68257010 |
Construction of roads |
193817 |
Upgradation to Concrete Road at Mouza Kotebarh from Debbrata Panda to Narayan Manna House |
Completion of work |
-
latitude : 22.00972543,22.00972543
Longitude : 87.76475615,87.76475615
file name : Image_27122023120724653.png
|
2023-12-27 12:07:24.725482 |
615 |
89373815 |
Construction of roads |
170000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.05039181,22.0503907,22.05038252
Longitude : 87.78106602,87.78108184,87.78108288
file name : Image_02102024144134436.png
|
2024-10-02 14:41:34.500823 |
616 |
89373815 |
Construction of roads |
170000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.05028759,22.05035029
Longitude : 87.78098447,87.78099508
file name : Image_02102024143308263.png
|
2024-10-02 14:33:08.333855 |
617 |
89373815 |
Construction of roads |
170000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.0506307,22.05445755
Longitude : 87.7804921,87.78052391
file name : Image_02102024142852855.png
|
2024-10-02 14:28:52.921922 |
618 |
89366688 |
Construction of roads |
180000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.03378224,22.03381447
Longitude : 87.77050501,87.77046399
file name : Image_02102024164238493.png
|
2024-10-02 16:42:38.548285 |
619 |
89366688 |
Construction of roads |
180000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.03381923,22.03382253,22.03382233
Longitude : 87.77045086,87.77045519,87.7704567
file name : Image_02102024163827719.png
|
2024-10-02 16:38:27.773461 |
620 |
89366688 |
Construction of roads |
180000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.03382411,22.03382273,22.03382173
Longitude : 87.77044471,87.77044543,87.77044576
file name : Image_02102024163409167.png
|
2024-10-02 16:34:09.232001 |
621 |
89369835 |
Construction of roads |
190000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.05566832,22.05566716
Longitude : 87.7852588,87.78526074
file name : Image_04102024142427266.png
|
2024-10-04 14:24:27.345805 |
622 |
89369835 |
Construction of roads |
190000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.05569492,22.0556814
Longitude : 87.78526785,87.78526416
file name : Image_04102024142041586.png
|
2024-10-04 14:20:41.566536 |
623 |
89369835 |
Construction of roads |
190000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.05572275,22.05568272
Longitude : 87.78531717,87.78532131
file name : Image_04102024140734842.png
|
2024-10-04 14:07:34.9076 |
624 |
89371619 |
Construction of roads |
120000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.05448926,22.05447586
Longitude : 87.78611429,87.78612751
file name : Image_03102024134609015.png
|
2024-10-03 13:46:09.971039 |
625 |
89371619 |
Construction of roads |
120000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.05446889,22.05445623
Longitude : 87.78633525,87.78633846
file name : Image_03102024134025589.png
|
2024-10-03 13:40:25.654753 |
626 |
89371083 |
Construction of roads |
170000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.05707395,22.0574892
Longitude : 87.78664988,87.7866436
file name : Image_03102024133440886.png
|
2024-10-03 13:34:40.953074 |
627 |
89371083 |
Construction of roads |
170000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.0574858,22.057187
Longitude : 87.7866486,87.78660594
file name : Image_03102024133009646.png
|
2024-10-03 13:30:09.762052 |
628 |
89374404 |
Construction of roads |
120000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.0448811,22.04486458
Longitude : 87.77566845,87.77575514
file name : Image_04102024132328517.png
|
2024-10-04 13:23:28.593754 |
629 |
89374404 |
Construction of roads |
120000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.01000767,22.01000767
Longitude : 87.76453156,87.76453156
file name : Image_04102024131559193.png
|
2024-10-04 13:15:59.32873 |
630 |
89251421 |
Construction of roads |
280000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.0329519,22.03284823
Longitude : 87.7684152,87.76869039
file name : Image_03102024123524379.png
|
2024-10-03 12:35:24.455645 |
631 |
89251421 |
Construction of roads |
280000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.0329526,22.0329526
Longitude : 87.768419,87.768419
file name : Image_03102024123037098.png
|
2024-10-03 12:30:37.179624 |
632 |
68525390 |
Construction of roads |
195252 |
Construction of roads1 |
Roof laid |
-
latitude : 22.05402021,22.05399981
Longitude : 87.75496656,87.75497972
file name : Image_08012024141452283.png
|
2024-01-08 14:14:52.386727 |
633 |
68525390 |
Construction of roads |
195252 |
Construction of roads1 |
Plinth level |
-
latitude : 22.0539962,22.0539947
Longitude : 87.75498106,87.7549796
file name : Image_08012024141220423.png
|
2024-01-08 14:12:20.49935 |
634 |
68525390 |
Construction of roads |
195252 |
Construction of roads1 |
Completion of work |
-
latitude : 22.05389387,22.05405722
Longitude : 87.75504806,87.75501007
file name : Image_08012024140941805.png
|
2024-01-08 14:09:41.897284 |
635 |
68262750 |
Pipeline connection for water supply to all houses |
63049 |
Pipeline connection for water supply to all houses1 |
Plinth level |
-
latitude : 22.02036981,22.02004463
Longitude : 87.73980548,87.74002047
file name : Image_29122023080032131.png
|
2023-12-29 08:00:32.202862 |
636 |
68262750 |
Pipeline connection for water supply to all houses |
63049 |
Pipeline connection for water supply to all houses1 |
Completion of work |
-
latitude : 22.02136827,22.02138079
Longitude : 87.74003932,87.74002866
file name : Image_29122023075246787.png
|
2023-12-29 07:52:46.874888 |
637 |
92547541 |
Construction of roads |
203206 |
UPGRADATION OF CC ROAD AT MOUZA CHOWDHUNIA FROM THE HOUSE OF LAKSHMAN MAITY TO KATHPOOL |
Roof laid |
-
latitude : 22.03766568,22.03766568
Longitude : 87.78310648,87.78310648
file name : Image_27032024160401255.png
|
2024-03-27 16:04:01.362674 |
638 |
92547541 |
Construction of roads |
203206 |
UPGRADATION OF CC ROAD AT MOUZA CHOWDHUNIA FROM THE HOUSE OF LAKSHMAN MAITY TO KATHPOOL |
Plinth level |
-
latitude : 22.05980462,22.05980462
Longitude : 87.7617035,87.7617035
file name : Image_27032024155952471.png
|
2024-03-27 15:59:52.674341 |
639 |
92547541 |
Construction of roads |
203206 |
UPGRADATION OF CC ROAD AT MOUZA CHOWDHUNIA FROM THE HOUSE OF LAKSHMAN MAITY TO KATHPOOL |
Completion of work |
-
latitude : 22.05573963,22.05573963
Longitude : 87.77914758,87.77914758
file name : Image_16032024162641846.png
|
2024-03-16 16:26:41.92082 |
640 |
68503233 |
Repair of drainage channel |
250000 |
Repair of drainage channel1 |
Roof laid |
-
latitude : 22.04256676
Longitude : 87.7824668
file name : Image_02082024134619763.png
|
2024-08-02 13:46:19.845173 |
641 |
68503233 |
Repair of drainage channel |
250000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 22.04254872
Longitude : 87.78248023
file name : Image_18072024154944659.png
|
2024-07-18 15:49:44.726679 |
642 |
68503233 |
Repair of drainage channel |
250000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 22.04253526
Longitude : 87.78245197
file name : Image_18072024154442522.png
|
2024-07-18 15:44:42.584551 |
643 |
99370592 |
Water Supply to villages |
203000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.05380478
Longitude : 87.79571983
file name : Image_20072024121228375.png
|
2024-07-20 12:12:28.450619 |
644 |
99370592 |
Water Supply to villages |
203000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.05406507
Longitude : 87.79591817
file name : Image_20072024120641605.png
|
2024-07-20 12:06:41.68674 |
645 |
68502933 |
Repair of drainage channel |
150000 |
Repair of drainage channel1 |
Roof laid |
-
latitude : 22.04901722
Longitude : 87.78881607
file name : Image_18072024181114515.png
|
2024-07-18 18:11:14.593949 |
646 |
68502933 |
Repair of drainage channel |
150000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 22.04910123
Longitude : 87.78856355
file name : Image_18072024180718581.png
|
2024-07-18 18:07:18.645906 |
647 |
68502933 |
Repair of drainage channel |
150000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 22.0489329
Longitude : 87.7886407
file name : Image_18072024180233574.png
|
2024-07-18 18:02:33.643716 |
648 |
68263265 |
Construction of toilets in public institutions |
310000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 22.01042036
Longitude : 87.76123048
file name : Image_19072024110025285.png
|
2024-07-19 11:00:25.358419 |
649 |
68263265 |
Construction of toilets in public institutions |
310000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 22.01042445
Longitude : 87.76123024
file name : Image_19072024105644796.png
|
2024-07-19 10:56:44.880953 |
650 |
68496862 |
Repair of drainage channel |
300000 |
Repair of drainage channel1 |
Roof laid |
-
latitude : 22.05891049
Longitude : 87.78186492
file name : Image_01082024163626467.png
|
2024-08-01 16:36:26.55576 |
651 |
68496862 |
Repair of drainage channel |
300000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 22.05886267
Longitude : 87.78190034
file name : Image_01082024163325710.png
|
2024-08-01 16:33:25.780501 |
652 |
68496862 |
Repair of drainage channel |
300000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 22.0588091
Longitude : 87.7820519
file name : Image_01082024162620459.png
|
2024-08-01 16:26:20.533452 |
653 |
106575844 |
Construction of roads |
53695 |
Construction of roads1 |
Roof laid |
-
latitude : 22.05016255,22.05012774
Longitude : 87.77575041,87.77577396
file name : Image_20072024151826843.png
|
2024-07-20 15:18:26.945766 |
654 |
106575844 |
Construction of roads |
53695 |
Construction of roads1 |
Plinth level |
-
latitude : 22.05011187,22.05011384
Longitude : 87.77582951,87.77582877
file name : Image_20072024151523243.png
|
2024-07-20 15:15:23.326674 |
655 |
106575844 |
Construction of roads |
53695 |
Construction of roads1 |
Completion of work |
-
latitude : 22.01980999,22.05001271
Longitude : 87.81939062,87.77578352
file name : Image_20072024151118318.png
|
2024-07-20 15:11:18.400138 |
656 |
39111037 |
sinking of Tubewell with pump at mouza Kotebarh |
250000 |
sinking of Tubewell with pump at mouza Kotebarh1 |
Roof laid |
-
latitude : 22.04982921
Longitude : 87.77998479
file name : Image_25012022114412077.png
|
2022-01-25 11:44:12.184467 |
657 |
39111037 |
sinking of Tubewell with pump at mouza Kotebarh |
250000 |
sinking of Tubewell with pump at mouza Kotebarh1 |
Plinth level |
-
latitude : 22.04979227
Longitude : 87.7799045
file name : Image_25012022113846127.png
|
2022-01-25 11:38:46.22565 |
658 |
39111037 |
sinking of Tubewell with pump at mouza Kotebarh |
250000 |
sinking of Tubewell with pump at mouza Kotebarh1 |
Completion of work |
-
latitude : 22.04992873
Longitude : 87.77990261
file name : Image_13012022120110757.png
|
2022-01-13 12:01:10.870409 |
659 |
39111126 |
sinking of Tubewell with pump at mouza Dwarikachak |
250000 |
sinking of Tubewell with pump at mouza Dwarikachak1 |
Roof laid |
-
latitude : 22.05312057
Longitude : 87.75578568
file name : Image_08062021124353994.png
|
2021-06-08 12:43:54.117529 |
660 |
39111126 |
sinking of Tubewell with pump at mouza Dwarikachak |
250000 |
sinking of Tubewell with pump at mouza Dwarikachak1 |
Plinth level |
-
latitude : 22.05312755
Longitude : 87.75581824
file name : Image_08062021123701513.png
|
2021-06-08 12:37:01.624108 |
661 |
39111126 |
sinking of Tubewell with pump at mouza Dwarikachak |
250000 |
sinking of Tubewell with pump at mouza Dwarikachak1 |
Completion of work |
-
latitude : 22.05312414
Longitude : 87.75580294
file name : Image_08062021123037111.png
|
2021-06-08 12:30:37.242557 |
662 |
39111126 |
sinking of Tubewell with pump at mouza Dwarikachak |
250000 |
sinking of Tubewell with pump at mouza Dwarikachak1 |
Completion of work |
-
latitude : 22.0531287
Longitude : 87.75581291
file name : Image_08062021123142656.png
|
2021-06-08 12:31:42.764874 |
663 |
34738273 |
Sink of tubewell with Sub pump at mouza Kalaberia |
200000 |
Sink of tubewell with Sub pump at mouza Kalaberia1 |
Roof laid |
-
latitude : 22.05392262
Longitude : 87.78120396
file name : Image_21022022131455838.png
|
2022-02-21 13:14:55.930587 |
664 |
34738273 |
Sink of tubewell with Sub pump at mouza Kalaberia |
200000 |
Sink of tubewell with Sub pump at mouza Kalaberia1 |
Plinth level |
-
latitude : 22.05392404
Longitude : 87.781199
file name : Image_21022022131119785.png
|
2022-02-21 13:11:19.872064 |
665 |
34738273 |
Sink of tubewell with Sub pump at mouza Kalaberia |
200000 |
Sink of tubewell with Sub pump at mouza Kalaberia1 |
Completion of work |
-
latitude : 22.05393079
Longitude : 87.78120707
file name : Image_21022022130000182.png
|
2022-02-21 13:00:00.283577 |
666 |
35134698 |
Sinking of Tube Well with Pump at mouza Kotebarh |
250000 |
Sinking of Tube Well with Pump at mouza Kotebarh1 |
Roof laid |
-
latitude : 22.0469546
Longitude : 87.7785606
file name : Image_03072021122929224.png
|
2021-07-03 12:29:29.299981 |
667 |
35134698 |
Sinking of Tube Well with Pump at mouza Kotebarh |
250000 |
Sinking of Tube Well with Pump at mouza Kotebarh1 |
Plinth level |
-
latitude : 22.0469833
Longitude : 87.7785314
file name : Image_23052021161235215.png
|
2021-05-23 16:12:35.267664 |
668 |
35134698 |
Sinking of Tube Well with Pump at mouza Kotebarh |
250000 |
Sinking of Tube Well with Pump at mouza Kotebarh1 |
Completion of work |
-
latitude : 22.0469808
Longitude : 87.7785323
file name : Image_23052021111853325.png
|
2021-05-23 11:18:53.382731 |
669 |
39110971 |
sinking of Tubewell with pump mouza Shukrullapur |
250000 |
sinking of Tubewell with pump mouza Shukrullapur1 |
Roof laid |
-
latitude : 22.01683587860316
Longitude : 87.78107511810958
file name : Image_03032022170247919.png
|
2022-03-03 17:02:47.954211 |
670 |
39110971 |
sinking of Tubewell with pump mouza Shukrullapur |
250000 |
sinking of Tubewell with pump mouza Shukrullapur1 |
Plinth level |
-
latitude : 22.016883194446564
Longitude : 87.78095450252295
file name : Image_19022022095348117.png
|
2022-02-19 09:53:48.210529 |
671 |
39110971 |
sinking of Tubewell with pump mouza Shukrullapur |
250000 |
sinking of Tubewell with pump mouza Shukrullapur1 |
Completion of work |
-
latitude : 22.01693755108863
Longitude : 87.78099054470658
file name : Image_09022022131016933.png
|
2022-02-09 13:10:16.992646 |
672 |
34028257 |
Sinking of TubeWell withPump at mouza Bhucharabarh |
250000 |
Sinking of TubeWell withPump at mouza Bhucharabarh1 |
Roof laid |
-
latitude : 22.060603452846408
Longitude : 87.77820280753076
file name : Image_28062021161147563.png
|
2021-06-28 16:11:47.61729 |
673 |
34028257 |
Sinking of TubeWell withPump at mouza Bhucharabarh |
250000 |
Sinking of TubeWell withPump at mouza Bhucharabarh1 |
Plinth level |
-
latitude : 22.06055144313723
Longitude : 87.77809593826532
file name : Image_08052021091415813.png
|
2021-05-08 09:14:15.958955 |
674 |
34028257 |
Sinking of TubeWell withPump at mouza Bhucharabarh |
250000 |
Sinking of TubeWell withPump at mouza Bhucharabarh1 |
Completion of work |
-
latitude : 22.058768989518285
Longitude : 87.77898592874408
file name : Image_06052021171603271.png
|
2021-05-06 17:16:03.096878 |
675 |
34027839 |
Sinking of Tube Well with Pump at mouza Kotebarh |
250000 |
Sinking of Tube Well with Pump at mouza Kotebarh1 |
Roof laid |
-
latitude : 22.043138877488673
Longitude : 87.78208832256496
file name : Image_28062021165924475.png
|
2021-06-28 16:59:24.549694 |
676 |
34027839 |
Sinking of Tube Well with Pump at mouza Kotebarh |
250000 |
Sinking of Tube Well with Pump at mouza Kotebarh1 |
Plinth level |
-
latitude : 22.04407475888729
Longitude : 87.78154039755464
file name : Image_06062021095533401.png
|
2021-06-06 09:55:33.483 |
677 |
34027839 |
Sinking of Tube Well with Pump at mouza Kotebarh |
250000 |
Sinking of Tube Well with Pump at mouza Kotebarh1 |
Completion of work |
-
latitude : 22.044088505208492
Longitude : 87.78152933344245
file name : Image_03062021112601558.png
|
2021-06-03 11:26:01.625831 |
678 |
34028595 |
Sinking of Tube Well with Pump at mouza Kalaberia |
250000 |
Sinking of Tube Well with Pump at mouza Kalaberia1 |
Roof laid |
-
latitude : 22.05458078
Longitude : 87.7851431
file name : Image_10062021130907725.png
|
2021-06-10 13:09:07.813086 |
679 |
34028595 |
Sinking of Tube Well with Pump at mouza Kalaberia |
250000 |
Sinking of Tube Well with Pump at mouza Kalaberia1 |
Plinth level |
-
latitude : 22.05457262
Longitude : 87.78517345
file name : Image_10062021130338180.png
|
2021-06-10 13:03:38.267473 |
680 |
34028595 |
Sinking of Tube Well with Pump at mouza Kalaberia |
250000 |
Sinking of Tube Well with Pump at mouza Kalaberia1 |
Completion of work |
-
latitude : 22.05458853
Longitude : 87.78516559
file name : Image_10062021125254495.png
|
2021-06-10 12:52:54.615138 |
681 |
39111007 |
sinking of Tubewell with pump mouza Su-charabarh |
250000 |
sinking of Tubewell with pump mouza Su-charabarh1 |
Roof laid |
-
latitude : 22.05566459
Longitude : 87.76931613
file name : Image_22012022163342813.png
|
2022-01-22 16:33:42.928463 |
682 |
39111007 |
sinking of Tubewell with pump mouza Su-charabarh |
250000 |
sinking of Tubewell with pump mouza Su-charabarh1 |
Plinth level |
-
latitude : 22.05568004
Longitude : 87.76932886
file name : Image_22012022162829943.png
|
2022-01-22 16:28:30.055207 |
683 |
39111007 |
sinking of Tubewell with pump mouza Su-charabarh |
250000 |
sinking of Tubewell with pump mouza Su-charabarh1 |
Completion of work |
-
latitude : 22.05571247
Longitude : 87.76931845
file name : Image_22012022162349850.png
|
2022-01-22 16:23:49.979425 |
684 |
34028543 |
Sinking of Tube Well with Pump at mouza Kotebarh |
250000 |
Sinking of Tube Well with Pump at mouza Kotebarh1 |
Roof laid |
-
latitude : 22.04529013
Longitude : 87.78521407
file name : Image_28012022160637991.png
|
2022-01-28 16:06:38.41696 |
685 |
34028543 |
Sinking of Tube Well with Pump at mouza Kotebarh |
250000 |
Sinking of Tube Well with Pump at mouza Kotebarh1 |
Plinth level |
-
latitude : 22.04526643
Longitude : 87.78525628
file name : Image_28012022160252686.png
|
2022-01-28 16:02:52.767288 |
686 |
34028543 |
Sinking of Tube Well with Pump at mouza Kotebarh |
250000 |
Sinking of Tube Well with Pump at mouza Kotebarh1 |
Completion of work |
-
latitude : 22.04528033
Longitude : 87.78523287
file name : Image_28012022155839464.png
|
2022-01-28 15:58:39.485327 |
687 |
39110948 |
sinking of Tubewell with pump at mouza Kotebarh |
250000 |
sinking of Tubewell with pump at mouza Kotebarh1 |
Roof laid |
-
latitude : 22.04221805
Longitude : 87.78227103
file name : Image_22012022160057593.png
|
2022-01-22 16:00:57.71318 |
688 |
39110948 |
sinking of Tubewell with pump at mouza Kotebarh |
250000 |
sinking of Tubewell with pump at mouza Kotebarh1 |
Plinth level |
-
latitude : 22.04226058
Longitude : 87.78227395
file name : Image_22012022155600577.png
|
2022-01-22 15:56:00.689949 |
689 |
39110948 |
sinking of Tubewell with pump at mouza Kotebarh |
250000 |
sinking of Tubewell with pump at mouza Kotebarh1 |
Completion of work |
-
latitude : 22.04225686
Longitude : 87.7822624
file name : Image_22012022155029777.png
|
2022-01-22 15:50:29.889008 |
690 |
34027496 |
Sinking of TubeWell with Pump at mouza Sucharabarh |
250000 |
Sinking of TubeWell with Pump at mouza Sucharabarh1 |
Roof laid |
-
latitude : 22.04825792
Longitude : 87.76939061
file name : Image_22012022171637090.png
|
2022-01-22 17:16:37.190331 |
691 |
34027496 |
Sinking of TubeWell with Pump at mouza Sucharabarh |
250000 |
Sinking of TubeWell with Pump at mouza Sucharabarh1 |
Plinth level |
-
latitude : 22.0482622
Longitude : 87.76937475
file name : Image_22012022171244520.png
|
2022-01-22 17:12:44.621464 |
692 |
34027496 |
Sinking of TubeWell with Pump at mouza Sucharabarh |
250000 |
Sinking of TubeWell with Pump at mouza Sucharabarh1 |
Completion of work |
-
latitude : 22.04822126
Longitude : 87.76939262
file name : Image_22012022170344919.png
|
2022-01-22 17:03:45.019726 |
693 |
39110981 |
sinking of Tubewell with pump mouza Bhu-charabarh |
250000 |
sinking of Tubewell with pump mouza Bhu-charabarh1 |
Roof laid |
-
latitude : 22.06037612
Longitude : 87.77142674
file name : Image_01022022132216414.png
|
2022-02-01 13:22:16.522164 |
694 |
39110981 |
sinking of Tubewell with pump mouza Bhu-charabarh |
250000 |
sinking of Tubewell with pump mouza Bhu-charabarh1 |
Plinth level |
-
latitude : 22.060212772339582
Longitude : 87.77139276266098
file name : Image_31012022152531370.png
|
2022-01-31 15:25:31.458545 |
695 |
39110981 |
sinking of Tubewell with pump mouza Bhu-charabarh |
250000 |
sinking of Tubewell with pump mouza Bhu-charabarh1 |
Completion of work |
-
latitude : 22.060347637161613
Longitude : 87.77138153091073
file name : Image_07012022111043947.png
|
2022-01-07 11:10:44.032649 |
696 |
49211865 |
LADIES TOILET AT GRAM PANCHAYAT OFFICE |
99571 |
LADIES TOILET AT GRAM PANCHAYAT OFFICE1 |
Roof laid |
-
latitude : 22.0555191
Longitude : 87.7789259
file name : Image_19072023130011019.png
|
2023-07-19 13:00:11.078899 |
697 |
49211865 |
LADIES TOILET AT GRAM PANCHAYAT OFFICE |
99571 |
LADIES TOILET AT GRAM PANCHAYAT OFFICE1 |
Plinth level |
-
latitude : 22.0555215
Longitude : 87.7789326
file name : Image_19072023125540845.png
|
2023-07-19 12:55:40.917753 |
698 |
49211865 |
LADIES TOILET AT GRAM PANCHAYAT OFFICE |
99571 |
LADIES TOILET AT GRAM PANCHAYAT OFFICE1 |
Completion of work |
-
latitude : 22.0555215
Longitude : 87.7789829
file name : Image_19072023124727217.png
|
2023-07-19 12:47:27.278572 |
699 |
47469229 |
Upgradation of concrete road at mouza Sukrullapur from the H/o Puchi Pradhan to the crematorium |
149944 |
Upgradation of concrete road at mouza Sukrullapur from the H/o Puchi Pradhan to the crematorium1 |
Roof laid |
-
latitude : 22.02069403,22.02073075
Longitude : 87.77497827,87.77497294
file name : Image_02022023160341045.png
|
2023-02-02 16:03:41.143218 |
700 |
47469229 |
Upgradation of concrete road at mouza Sukrullapur from the H/o Puchi Pradhan to the crematorium |
149944 |
Upgradation of concrete road at mouza Sukrullapur from the H/o Puchi Pradhan to the crematorium1 |
Plinth level |
-
latitude : 22.02071934,22.02071113,22.0207122,22.02071563
Longitude : 87.77491282,87.77491906,87.77492133,87.77492583
file name : Image_02022023155804048.png
|
2023-02-02 15:58:04.153553 |
701 |
47469229 |
Upgradation of concrete road at mouza Sukrullapur from the H/o Puchi Pradhan to the crematorium |
149944 |
Upgradation of concrete road at mouza Sukrullapur from the H/o Puchi Pradhan to the crematorium1 |
Completion of work |
-
latitude : 22.02069923,22.02066934
Longitude : 87.77446683,87.77444182
file name : Image_31012023173606186.png
|
2023-01-31 17:36:06.297045 |
702 |
47469229 |
Upgradation of concrete road at mouza Sukrullapur from the H/o Puchi Pradhan to the crematorium |
149944 |
Upgradation of concrete road at mouza Sukrullapur from the H/o Puchi Pradhan to the crematorium1 |
Completion of work |
-
latitude : 22.02070451,22.02073721,22.02075606,22.0207579
Longitude : 87.7750219,87.77497805,87.77497031,87.77496888
file name : Image_23012023154644783.png
|
2023-01-23 15:46:44.893947 |
703 |
47547994 |
Upgradation of concrete road at mouza Su Charabarh from the H/O Bapi Pandit to the H/O Santosh Pandi |
179938 |
Upgradation of concrete road at mouza Su Charabarh from the H/O Bapi Pandit to the H/O Santosh Pandi1 |
Plinth level |
-
latitude : 22.05572798,22.05572519,22.05575138
Longitude : 87.76733634,87.76733167,87.76732067
file name : Image_07022023165713050.png
|
2023-02-07 16:57:13.165681 |
704 |
47547994 |
Upgradation of concrete road at mouza Su Charabarh from the H/O Bapi Pandit to the H/O Santosh Pandi |
179938 |
Upgradation of concrete road at mouza Su Charabarh from the H/O Bapi Pandit to the H/O Santosh Pandi1 |
Roof laid |
-
latitude : 22.05601449,22.05601258
Longitude : 87.7672926,87.76727611
file name : Image_07022023170906174.png
|
2023-02-07 17:09:06.260198 |
705 |
47547994 |
Upgradation of concrete road at mouza Su Charabarh from the H/O Bapi Pandit to the H/O Santosh Pandi |
179938 |
Upgradation of concrete road at mouza Su Charabarh from the H/O Bapi Pandit to the H/O Santosh Pandi1 |
Completion of work |
-
latitude : 22.05574973,22.05574194
Longitude : 87.76732527,87.76731924
file name : Image_07022023164652308.png
|
2023-02-07 16:46:52.412062 |
706 |
47896877 |
Upgradation of concrete road at mouza Kalaberia from the Pucca road to the H/o Asish Mondal |
179960 |
Upgradation of concrete road at mouza Kalaberia from the Pucca road to the H/o Asish Mondal1 |
Roof laid |
-
latitude : 22.05793498,22.0581194,22.0580623
Longitude : 87.77968759,87.7796881,87.7797044
file name : Image_02022023135657710.png
|
2023-02-02 13:56:57.816964 |
707 |
47896877 |
Upgradation of concrete road at mouza Kalaberia from the Pucca road to the H/o Asish Mondal |
179960 |
Upgradation of concrete road at mouza Kalaberia from the Pucca road to the H/o Asish Mondal1 |
Plinth level |
-
latitude : 22.05777488,22.0577048,22.0577048
Longitude : 87.77966078,87.7797009,87.7797009
file name : Image_23012023142524084.png
|
2023-01-23 14:25:24.194882 |
708 |
47896877 |
Upgradation of concrete road at mouza Kalaberia from the Pucca road to the H/o Asish Mondal |
179960 |
Upgradation of concrete road at mouza Kalaberia from the Pucca road to the H/o Asish Mondal1 |
Completion of work |
-
latitude : 22.0578206,22.0578206
Longitude : 87.7795826,87.7795826
file name : Image_23012023114250070.png
|
2023-01-23 11:42:50.175727 |
709 |
47974829 |
Water pipeline at mouza Purba radhapur from the ICDS center to the H/o Madan Pradhan |
39996 |
Water pipeline at mouza Purba radhapur from the ICDS center to the H/o Madan Pradhan1 |
Roof laid |
-
latitude : 22.02196938,22.02198026,22.02199019
Longitude : 87.74058851,87.7405779,87.74060203
file name : Image_03022023150415188.png
|
2023-02-03 15:04:15.276006 |
710 |
47974829 |
Water pipeline at mouza Purba radhapur from the ICDS center to the H/o Madan Pradhan |
39996 |
Water pipeline at mouza Purba radhapur from the ICDS center to the H/o Madan Pradhan1 |
Plinth level |
-
latitude : 22.02195511,22.02196185,22.02196425
Longitude : 87.74061523,87.74060457,87.74058775
file name : Image_03022023145441104.png
|
2023-02-03 14:54:41.222278 |
711 |
47974829 |
Water pipeline at mouza Purba radhapur from the ICDS center to the H/o Madan Pradhan |
39996 |
Water pipeline at mouza Purba radhapur from the ICDS center to the H/o Madan Pradhan1 |
Completion of work |
-
latitude : 22.02137906,22.02143156
Longitude : 87.74001493,87.74002524
file name : Image_03022023144537989.png
|
2023-02-03 14:45:38.091588 |
712 |
48001751 |
Drinking water pipeline at mouza Kalaberia from the Prakash Samanta Subm. to H/o Manik Chini and Deb |
49937 |
Drinking water pipeline at mouza Kalaberia from the Prakash Samanta Subm. to H/o Manik Chini and Deb1 |
Roof laid |
-
latitude : 22.05321056,22.0528217,22.0529746
Longitude : 87.78142714,87.7817489,87.7816324
file name : Image_03022023134138611.png
|
2023-02-03 13:41:38.713327 |
713 |
48001751 |
Drinking water pipeline at mouza Kalaberia from the Prakash Samanta Subm. to H/o Manik Chini and Deb |
49937 |
Drinking water pipeline at mouza Kalaberia from the Prakash Samanta Subm. to H/o Manik Chini and Deb1 |
Plinth level |
-
latitude : 22.0529733,22.0529734
Longitude : 87.7816391,87.7816397
file name : Image_03022023133732412.png
|
2023-02-03 13:37:32.512718 |
714 |
48001751 |
Drinking water pipeline at mouza Kalaberia from the Prakash Samanta Subm. to H/o Manik Chini and Deb |
49937 |
Drinking water pipeline at mouza Kalaberia from the Prakash Samanta Subm. to H/o Manik Chini and Deb1 |
Completion of work |
-
latitude : 22.0529573,22.0529689
Longitude : 87.781663,87.7816515
file name : Image_03022023133209287.png
|
2023-02-03 13:32:09.391979 |
715 |
48000468 |
Drinking water pipeline at mouza Kalaberia from the Subhas Das Submersible to the H/o Prasanta Maity |
59703 |
Drinking water pipeline at mouza Kalaberia from the Subhas Das Submersible to the H/o Prasanta Maity1 |
Roof laid |
-
latitude : 22.06075777,22.06075784,22.0607588
Longitude : 87.78315018,87.78315705,87.78316195
file name : Image_02022023145227311.png
|
2023-02-02 14:52:27.41308 |
716 |
48000468 |
Drinking water pipeline at mouza Kalaberia from the Subhas Das Submersible to the H/o Prasanta Maity |
59703 |
Drinking water pipeline at mouza Kalaberia from the Subhas Das Submersible to the H/o Prasanta Maity1 |
Plinth level |
-
latitude : 22.0627021,22.06272289,22.06272599
Longitude : 87.78412121,87.78412891,87.78412985
file name : Image_02022023144448598.png
|
2023-02-02 14:44:48.701349 |
717 |
48000468 |
Drinking water pipeline at mouza Kalaberia from the Subhas Das Submersible to the H/o Prasanta Maity |
59703 |
Drinking water pipeline at mouza Kalaberia from the Subhas Das Submersible to the H/o Prasanta Maity1 |
Completion of work |
-
latitude : 22.0612099,22.06154473
Longitude : 87.7833155,87.78354564
file name : Image_02022023143625928.png
|
2023-02-02 14:36:26.029102 |
718 |
47977934 |
Tubewell with Submersble Pump and sock pit at mouza Dalbarh near the H/o Kanai das |
200000 |
Tubewell with Submersble Pump and sock pit at mouza Dalbarh near the H/o Kanai das1 |
Roof laid |
-
latitude : 22.03722454
Longitude : 87.78346072
file name : Image_04032022142214084.png
|
2022-03-04 14:22:14.18487 |
719 |
47977934 |
Tubewell with Submersble Pump and sock pit at mouza Dalbarh near the H/o Kanai das |
200000 |
Tubewell with Submersble Pump and sock pit at mouza Dalbarh near the H/o Kanai das1 |
Plinth level |
-
latitude : 22.03720535
Longitude : 87.7834325
file name : Image_22022022125211022.png
|
2022-02-22 12:52:11.13852 |
720 |
47977934 |
Tubewell with Submersble Pump and sock pit at mouza Dalbarh near the H/o Kanai das |
200000 |
Tubewell with Submersble Pump and sock pit at mouza Dalbarh near the H/o Kanai das1 |
Completion of work |
-
latitude : 22.03722152
Longitude : 87.78346781
file name : Image_22022022124846600.png
|
2022-02-22 12:48:46.737092 |
721 |
47985208 |
Tubewell with Submersible Pump Pipeline and sock pit at mouza Kotebarh near the H/o Nishikanta Jana |
250000 |
Tubewell with Submersible Pump Pipeline and sock pit at mouza Kotebarh near the H/o Nishikanta Jana 1 |
Roof laid |
-
latitude : 22.05158484
Longitude : 87.78585523
file name : Image_09032022114039475.png
|
2022-03-09 11:40:39.574859 |
722 |
47985208 |
Tubewell with Submersible Pump Pipeline and sock pit at mouza Kotebarh near the H/o Nishikanta Jana |
250000 |
Tubewell with Submersible Pump Pipeline and sock pit at mouza Kotebarh near the H/o Nishikanta Jana 1 |
Plinth level |
-
latitude : 22.05131032
Longitude : 87.78586828
file name : Image_09032022112714179.png
|
2022-03-09 11:27:14.277249 |
723 |
47985208 |
Tubewell with Submersible Pump Pipeline and sock pit at mouza Kotebarh near the H/o Nishikanta Jana |
250000 |
Tubewell with Submersible Pump Pipeline and sock pit at mouza Kotebarh near the H/o Nishikanta Jana 1 |
Completion of work |
-
latitude : 22.05157574
Longitude : 87.78597303
file name : Image_16022022122553239.png
|
2022-02-16 12:25:53.331909 |
724 |
47466195 |
Upgradation of concrete road at mouza Kalaberia from the H/o Sambhu Jana to the H/o Srikanta Samant |
250000 |
Upgradation of concrete road at mouza Kalaberia from the H/o Sambhu Jana to the H/o Srikanta Samant1 |
Roof laid |
-
latitude : 22.05794156,22.05800369
Longitude : 87.78952122,87.7894967
file name : Image_01042022134238015.png
|
2022-04-01 13:42:38.123995 |
725 |
47466195 |
Upgradation of concrete road at mouza Kalaberia from the H/o Sambhu Jana to the H/o Srikanta Samant |
250000 |
Upgradation of concrete road at mouza Kalaberia from the H/o Sambhu Jana to the H/o Srikanta Samant1 |
Plinth level |
-
latitude : 22.05794764,22.05798407
Longitude : 87.78951446,87.78948932
file name : Image_01042022132841438.png
|
2022-04-01 13:28:41.538005 |
726 |
47466195 |
Upgradation of concrete road at mouza Kalaberia from the H/o Sambhu Jana to the H/o Srikanta Samant |
250000 |
Upgradation of concrete road at mouza Kalaberia from the H/o Sambhu Jana to the H/o Srikanta Samant1 |
Completion of work |
-
latitude : 22.05851546,22.05852767
Longitude : 87.78911699,87.78911849
file name : Image_01042022131905586.png
|
2022-04-01 13:19:05.68938 |
727 |
49117199 |
TUBEWELL NEAR THE HOUSE OF SANKAR PATRA PURBA RADHAPUR |
200000 |
TUBEWELL NEAR THE HOUSE OF SANKAR PATRA PURBA RADHAPUR1 |
Roof laid |
-
latitude : 22.02465833333333
Longitude : 87.74854666666667
file name : Image_11052022152924793.png
|
2022-05-11 15:29:24.893529 |
728 |
49117199 |
TUBEWELL NEAR THE HOUSE OF SANKAR PATRA PURBA RADHAPUR |
200000 |
TUBEWELL NEAR THE HOUSE OF SANKAR PATRA PURBA RADHAPUR1 |
Plinth level |
-
latitude : 22.02469934
Longitude : 87.74851405
file name : Image_01042022142923626.png
|
2022-04-01 14:29:23.727979 |
729 |
49117199 |
TUBEWELL NEAR THE HOUSE OF SANKAR PATRA PURBA RADHAPUR |
200000 |
TUBEWELL NEAR THE HOUSE OF SANKAR PATRA PURBA RADHAPUR1 |
Plinth level |
-
latitude : 22.02469934
Longitude : 87.74851405
file name : Image_01042022150554641.png
|
2022-04-01 15:05:54.730331 |
730 |
49117199 |
TUBEWELL NEAR THE HOUSE OF SANKAR PATRA PURBA RADHAPUR |
200000 |
TUBEWELL NEAR THE HOUSE OF SANKAR PATRA PURBA RADHAPUR1 |
Completion of work |
-
latitude : 22.0246914
Longitude : 87.74862289
file name : Image_01042022142331245.png
|
2022-04-01 14:23:31.448617 |
731 |
47488265 |
Construction of boundary wall at Kotebarh VS Crematorium ground |
200000 |
Construction of boundary wall at Kotebarh VS Crematorium ground1 |
Roof laid |
-
latitude : 22.04739033
Longitude : 87.78084967
file name : Image_21022022125212930.png
|
2022-02-21 12:52:13.052351 |
732 |
47488265 |
Construction of boundary wall at Kotebarh VS Crematorium ground |
200000 |
Construction of boundary wall at Kotebarh VS Crematorium ground1 |
Plinth level |
-
latitude : 22.04757985
Longitude : 87.78086526
file name : Image_21022022124341347.png
|
2022-02-21 12:43:41.449338 |
733 |
47488265 |
Construction of boundary wall at Kotebarh VS Crematorium ground |
200000 |
Construction of boundary wall at Kotebarh VS Crematorium ground1 |
Completion of work |
-
latitude : 22.04777331
Longitude : 87.7808385
file name : Image_21022022123706632.png
|
2022-02-21 12:37:06.748382 |
734 |
49124462 |
TUBEWELL NEAR THE HOUSE OF PRADIP PATTANAYAK AT GUMKIA |
200000 |
TUBEWELL NEAR THE HOUSE OF PRADIP PATTANAYAK AT GUMKIA1 |
Roof laid |
-
latitude : 22.06768884
Longitude : 87.75327098
file name : Image_21012022122909792.png
|
2022-01-21 12:29:09.905278 |
735 |
49124462 |
TUBEWELL NEAR THE HOUSE OF PRADIP PATTANAYAK AT GUMKIA |
200000 |
TUBEWELL NEAR THE HOUSE OF PRADIP PATTANAYAK AT GUMKIA1 |
Plinth level |
-
latitude : 22.06775223
Longitude : 87.75326471
file name : Image_21012022121658837.png
|
2022-01-21 12:16:58.949237 |
736 |
49124462 |
TUBEWELL NEAR THE HOUSE OF PRADIP PATTANAYAK AT GUMKIA |
200000 |
TUBEWELL NEAR THE HOUSE OF PRADIP PATTANAYAK AT GUMKIA1 |
Completion of work |
-
latitude : 22.06765179
Longitude : 87.75324307
file name : Image_21012022120330353.png
|
2022-01-21 12:03:30.456923 |
737 |
47900404 |
Upgradation of concrete road with pilling at mouza Ashutia from Baropukur to the H/o Asish Giri |
329000 |
Upgradation of concrete road with pilling at mouza Ashutia from Baropukur to the H/o Asish Giri1 |
Roof laid |
-
latitude : 22.03068575821817,22.03068575821817
Longitude : 87.7659334614873,87.7659334614873
file name : Image_28032022121327780.png
|
2022-03-28 12:13:27.876778 |
738 |
47900404 |
Upgradation of concrete road with pilling at mouza Ashutia from Baropukur to the H/o Asish Giri |
329000 |
Upgradation of concrete road with pilling at mouza Ashutia from Baropukur to the H/o Asish Giri1 |
Plinth level |
-
latitude : 22.03108134213835,22.031052382662892
Longitude : 87.76604779064655,87.76608735322952
file name : Image_27032022150530096.png
|
2022-03-27 15:05:30.161559 |
739 |
47900404 |
Upgradation of concrete road with pilling at mouza Ashutia from Baropukur to the H/o Asish Giri |
329000 |
Upgradation of concrete road with pilling at mouza Ashutia from Baropukur to the H/o Asish Giri1 |
Completion of work |
-
latitude : 22.031008461490273,22.031040773727
Longitude : 87.76603630743921,87.7658637240529
file name : Image_27032022103659527.png
|
2022-03-27 10:36:59.598524 |
740 |
47467162 |
Upgradation of concrete road at mouza Gumkia from the H/o Tapan Pal to the H/o Barin Pradhan |
200000 |
Upgradation of concrete road at mouza Gumkia from the H/o Tapan Pal to the H/o Barin Pradhan1 |
Roof laid |
-
latitude : 22.06100732,22.06100209
Longitude : 87.77008689,87.77008227
file name : Image_09042022140255269.png
|
2022-04-09 14:02:55.352697 |
741 |
47467162 |
Upgradation of concrete road at mouza Gumkia from the H/o Tapan Pal to the H/o Barin Pradhan |
200000 |
Upgradation of concrete road at mouza Gumkia from the H/o Tapan Pal to the H/o Barin Pradhan1 |
Plinth level |
-
latitude : 22.06097706,22.0609773
Longitude : 87.77010494,87.77010474
file name : Image_09042022134003542.png
|
2022-04-09 13:40:03.646812 |
742 |
47467162 |
Upgradation of concrete road at mouza Gumkia from the H/o Tapan Pal to the H/o Barin Pradhan |
200000 |
Upgradation of concrete road at mouza Gumkia from the H/o Tapan Pal to the H/o Barin Pradhan1 |
Completion of work |
-
latitude : 22.06141228,22.06142376
Longitude : 87.76989067,87.76987639
file name : Image_07042022140622949.png
|
2022-04-07 14:06:23.040444 |
743 |
47995594 |
Drinking water Pipeline at mouza Kalaberia from the Satyanarayan Club to the H/o Arabinda Bera |
50000 |
Drinking water Pipeline at mouza Kalaberia from the Satyanarayan Club to the H/o Arabinda Bera1 |
Roof laid |
-
latitude : 22.05788,22.05788
Longitude : 87.79321166666665,87.79321166666665
file name : Image_10052022144906592.png
|
2022-05-10 14:49:06.719247 |
744 |
47995594 |
Drinking water Pipeline at mouza Kalaberia from the Satyanarayan Club to the H/o Arabinda Bera |
50000 |
Drinking water Pipeline at mouza Kalaberia from the Satyanarayan Club to the H/o Arabinda Bera1 |
Plinth level |
-
latitude : 22.057875,22.057891666666666
Longitude : 87.79324333333334,87.79323333333332
file name : Image_10052022144317225.png
|
2022-05-10 14:43:17.32967 |
745 |
47995594 |
Drinking water Pipeline at mouza Kalaberia from the Satyanarayan Club to the H/o Arabinda Bera |
50000 |
Drinking water Pipeline at mouza Kalaberia from the Satyanarayan Club to the H/o Arabinda Bera1 |
Completion of work |
-
latitude : 22.058038333333336,22.058185
Longitude : 87.79270999999999,87.79304833333332
file name : Image_10052022142753121.png
|
2022-05-10 14:27:53.230072 |
746 |
47996544 |
Drinking water pipeline at mouza Kalaberia from the H/o Narayan Jana to the H/o Jagannath Pandit |
50000 |
Drinking water pipeline at mouza Kalaberia from the H/o Narayan Jana to the H/o Jagannath Pandit1 |
Roof laid |
-
latitude : 22.0570667,22.057066
Longitude : 87.7946545,87.7946525
file name : Image_10052022151404246.png
|
2022-05-10 15:14:04.362606 |
747 |
47996544 |
Drinking water pipeline at mouza Kalaberia from the H/o Narayan Jana to the H/o Jagannath Pandit |
50000 |
Drinking water pipeline at mouza Kalaberia from the H/o Narayan Jana to the H/o Jagannath Pandit1 |
Plinth level |
-
latitude : 22.0570706,22.05707
Longitude : 87.7946491,87.7946548
file name : Image_10052022150744134.png
|
2022-05-10 15:07:44.234265 |
748 |
47996544 |
Drinking water pipeline at mouza Kalaberia from the H/o Narayan Jana to the H/o Jagannath Pandit |
50000 |
Drinking water pipeline at mouza Kalaberia from the H/o Narayan Jana to the H/o Jagannath Pandit1 |
Completion of work |
-
latitude : 22.0570703,22.057066
Longitude : 87.7946564,87.7946525
file name : Image_10052022145543004.png
|
2022-05-10 14:55:43.114181 |
749 |
47997043 |
Drinking water pipeline at mouza Kalaberia from the H/o Sudip Maity to the H/o Mohit Bera |
50000 |
Drinking water pipeline at mouza Kalaberia from the H/o Sudip Maity to the H/o Mohit Bera1 |
Roof laid |
-
latitude : 22.058445,22.058413333333338
Longitude : 87.79072166666668,87.79072999999998
file name : Image_10052022155937412.png
|
2022-05-10 15:59:37.531179 |
750 |
47997043 |
Drinking water pipeline at mouza Kalaberia from the H/o Sudip Maity to the H/o Mohit Bera |
50000 |
Drinking water pipeline at mouza Kalaberia from the H/o Sudip Maity to the H/o Mohit Bera1 |
Plinth level |
-
latitude : 22.058483333333335,22.058451666666663
Longitude : 87.79060499999999,87.79067500000001
file name : Image_10052022155247461.png
|
2022-05-10 15:52:47.574738 |
751 |
47997043 |
Drinking water pipeline at mouza Kalaberia from the H/o Sudip Maity to the H/o Mohit Bera |
50000 |
Drinking water pipeline at mouza Kalaberia from the H/o Sudip Maity to the H/o Mohit Bera1 |
Completion of work |
-
latitude : 22.058396666666667,22.058396666666667
Longitude : 87.79075499999999,87.79075499999999
file name : Image_10052022154758876.png
|
2022-05-10 15:47:59.053585 |
752 |
47984187 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Sekh Ismail |
200000 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Sekh Ismail1 |
Roof laid |
-
latitude : 22.0458915
Longitude : 87.7799212
file name : Image_10052022131638326.png
|
2022-05-10 13:16:38.422434 |
753 |
47984187 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Sekh Ismail |
200000 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Sekh Ismail1 |
Plinth level |
-
latitude : 22.0460572
Longitude : 87.7794734
file name : Image_10052022131054730.png
|
2022-05-10 13:10:54.819137 |
754 |
47984187 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Sekh Ismail |
200000 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Sekh Ismail1 |
Plinth level |
-
latitude : 22.0459283
Longitude : 87.7797834
file name : Image_04042022114014536.png
|
2022-04-04 11:40:14.632895 |
755 |
47984187 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Sekh Ismail |
200000 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Sekh Ismail1 |
Completion of work |
-
latitude : 22.0458964
Longitude : 87.7798851
file name : Image_04042022113448250.png
|
2022-04-04 11:34:48.372284 |
756 |
47463762 |
Upgradation of concrete road at mouza Kotebarh from the H/o Maifuj Sekh to the H/o Hamu Khan |
250000 |
Upgradation of concrete road at mouza Kotebarh from the H/o Maifuj Sekh to the H/o Hamu Khan1 |
Roof laid |
-
latitude : 22.0448249,22.04481616
Longitude : 87.77760388,87.77761253
file name : Image_29032022112446192.png
|
2022-03-29 11:24:46.290572 |
757 |
47463762 |
Upgradation of concrete road at mouza Kotebarh from the H/o Maifuj Sekh to the H/o Hamu Khan |
250000 |
Upgradation of concrete road at mouza Kotebarh from the H/o Maifuj Sekh to the H/o Hamu Khan1 |
Plinth level |
-
latitude : 22.04508286,22.04508308
Longitude : 87.77750737,87.77750744
file name : Image_29032022111810597.png
|
2022-03-29 11:18:10.688854 |
758 |
47463762 |
Upgradation of concrete road at mouza Kotebarh from the H/o Maifuj Sekh to the H/o Hamu Khan |
250000 |
Upgradation of concrete road at mouza Kotebarh from the H/o Maifuj Sekh to the H/o Hamu Khan1 |
Completion of work |
-
latitude : 22.04501871,22.0450094
Longitude : 87.77746773,87.77748669
file name : Image_29032022110913718.png
|
2022-03-29 11:09:13.818133 |
759 |
47976114 |
Tubewell with Submersible pump pipeline and sock pit at mouza Bhu Charabarh near H/o Swapan Acharya |
200000 |
Tubewell with Submersible pump pipeline and sock pit at mouza Bhu Charabarh near H/o Swapan Acharya1 |
Roof laid |
-
latitude : 22.060921666666665
Longitude : 87.78248666666666
file name : Image_11052022131943254.png
|
2022-05-11 13:19:43.360829 |
760 |
47976114 |
Tubewell with Submersible pump pipeline and sock pit at mouza Bhu Charabarh near H/o Swapan Acharya |
200000 |
Tubewell with Submersible pump pipeline and sock pit at mouza Bhu Charabarh near H/o Swapan Acharya1 |
Plinth level |
-
latitude : 22.06089833333333
Longitude : 87.78245999999999
file name : Image_11052022131531771.png
|
2022-05-11 13:15:31.875707 |
761 |
47976114 |
Tubewell with Submersible pump pipeline and sock pit at mouza Bhu Charabarh near H/o Swapan Acharya |
200000 |
Tubewell with Submersible pump pipeline and sock pit at mouza Bhu Charabarh near H/o Swapan Acharya1 |
Completion of work |
-
latitude : 22.0589301
Longitude : 87.7801764
file name : Image_11052022131306279.png
|
2022-05-11 13:13:06.36808 |
762 |
47462552 |
Upgradation of concrete road at mouza Dalbarh from the H/o Swapan Basu to the H/o Tapan Bhunia |
150000 |
Upgradation of concrete road at mouza Dalbarh from the H/o Swapan Basu to the H/o Tapan Bhunia1 |
Roof laid |
-
latitude : 22.042653333333337,22.042645
Longitude : 87.784575,87.78457333333333
file name : Image_10052022132948051.png
|
2022-05-10 13:29:48.155861 |
763 |
47462552 |
Upgradation of concrete road at mouza Dalbarh from the H/o Swapan Basu to the H/o Tapan Bhunia |
150000 |
Upgradation of concrete road at mouza Dalbarh from the H/o Swapan Basu to the H/o Tapan Bhunia1 |
Plinth level |
-
latitude : 22.042826666666663,22.042826666666663
Longitude : 87.78459999999998,87.78459999999998
file name : Image_10052022132720101.png
|
2022-05-10 13:27:20.200153 |
764 |
47462552 |
Upgradation of concrete road at mouza Dalbarh from the H/o Swapan Basu to the H/o Tapan Bhunia |
150000 |
Upgradation of concrete road at mouza Dalbarh from the H/o Swapan Basu to the H/o Tapan Bhunia1 |
Completion of work |
-
latitude : 22.04277833333333,22.042806666666667
Longitude : 87.78468166666669,87.78463666666667
file name : Image_10052022132432245.png
|
2022-05-10 13:24:32.353039 |
765 |
47898895 |
Upgradation of concrete road at mouza Balaramchak from the Ganga Mandir to the H/o Mamud Sekh |
149941 |
Upgradation of concrete road at mouza Balaramchak from the Ganga Mandir to the H/o Mamud Sekh1 |
Roof laid |
-
latitude : 22.04487167,22.04487655
Longitude : 87.76899791,87.76899604
file name : Image_31012023153201936.png
|
2023-01-31 15:32:02.054089 |
766 |
47898895 |
Upgradation of concrete road at mouza Balaramchak from the Ganga Mandir to the H/o Mamud Sekh |
149941 |
Upgradation of concrete road at mouza Balaramchak from the Ganga Mandir to the H/o Mamud Sekh1 |
Plinth level |
-
latitude : 22.04487179,22.04487088
Longitude : 87.76895019,87.76895908
file name : Image_31012023152320515.png
|
2023-01-31 15:23:20.623355 |
767 |
47898895 |
Upgradation of concrete road at mouza Balaramchak from the Ganga Mandir to the H/o Mamud Sekh |
149941 |
Upgradation of concrete road at mouza Balaramchak from the Ganga Mandir to the H/o Mamud Sekh1 |
Completion of work |
-
latitude : 22.04478477,22.0449478
Longitude : 87.76898868,87.7695301
file name : Image_19012023141802959.png
|
2023-01-19 14:18:03.061165 |
768 |
49138865 |
CULVERT ON CHOTO KHAL NEAR SWAPAN DAS AT SU CHARABARH |
150000 |
CULVERT ON CHOTO KHAL NEAR SWAPAN DAS AT SU CHARABARH1 |
Roof laid |
-
latitude : 22.05046333333333,22.05046333333333
Longitude : 87.76420666666667,87.76420666666667
file name : Image_13052022190038290.png
|
2022-05-13 19:00:38.397781 |
769 |
49138865 |
CULVERT ON CHOTO KHAL NEAR SWAPAN DAS AT SU CHARABARH |
150000 |
CULVERT ON CHOTO KHAL NEAR SWAPAN DAS AT SU CHARABARH1 |
Plinth level |
-
latitude : 22.050498333333334,22.050471666666667
Longitude : 87.76417833333335,87.76414500000001
file name : Image_11052022172751639.png
|
2022-05-11 17:27:51.748854 |
770 |
49138865 |
CULVERT ON CHOTO KHAL NEAR SWAPAN DAS AT SU CHARABARH |
150000 |
CULVERT ON CHOTO KHAL NEAR SWAPAN DAS AT SU CHARABARH1 |
Completion of work |
-
latitude : 22.050471666666667,22.05046666666666,22.05046666666666
Longitude : 87.76423500000001,87.76423666666666,87.76423666666666
file name : Image_11052022172154661.png
|
2022-05-11 17:21:54.75074 |
771 |
47465380 |
Upgradation of concrete road with pilling at mouza Kotebarh from the H/o Kajal Bhakta to the H/o |
380000 |
Upgradation of concrete road with pilling at mouza Kotebarh from the H/o Kajal Bhakta to the H/o 1 |
Roof laid |
-
latitude : 22.0539177,22.054250000000003
Longitude : 87.7845942,87.78426333333333
file name : Image_15072022181821960.png
|
2022-07-15 18:18:22.056877 |
772 |
47465380 |
Upgradation of concrete road with pilling at mouza Kotebarh from the H/o Kajal Bhakta to the H/o |
380000 |
Upgradation of concrete road with pilling at mouza Kotebarh from the H/o Kajal Bhakta to the H/o 1 |
Plinth level |
-
latitude : 22.054116666666665,22.05413
Longitude : 87.78436666666667,87.78436166666667
file name : Image_15072022181515058.png
|
2022-07-15 18:15:15.131246 |
773 |
47465380 |
Upgradation of concrete road with pilling at mouza Kotebarh from the H/o Kajal Bhakta to the H/o |
380000 |
Upgradation of concrete road with pilling at mouza Kotebarh from the H/o Kajal Bhakta to the H/o 1 |
Completion of work |
-
latitude : 22.054088333333333,22.054088333333333
Longitude : 87.78423333333333,87.78423166666668
file name : Image_15072022181113619.png
|
2022-07-15 18:11:13.706442 |
774 |
47983031 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Najrul Khan |
200000 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Najrul Khan1 |
Roof laid |
-
latitude : 22.045136666666668
Longitude : 87.77298833333334
file name : Image_10052022125953970.png
|
2022-05-10 12:59:54.104092 |
775 |
47983031 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Najrul Khan |
200000 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Najrul Khan1 |
Plinth level |
-
latitude : 22.045113333333333
Longitude : 87.77301333333335
file name : Image_10052022125428082.png
|
2022-05-10 12:54:28.199956 |
776 |
47983031 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Najrul Khan |
200000 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Najrul Khan1 |
Completion of work |
-
latitude : 22.045101666666664
Longitude : 87.77299
file name : Image_10052022124549617.png
|
2022-05-10 12:45:49.786864 |
777 |
48005302 |
Tubewell with Submersible pump and sock pit at mouza Kalaberia near the H/o Gorachand halder |
200000 |
Tubewell with Submersible pump and sock pit at mouza Kalaberia near the H/o Gorachand halder1 |
Roof laid |
-
latitude : 22.0601836
Longitude : 87.7830362
file name : Image_10052022141523455.png
|
2022-05-10 14:15:23.535755 |
778 |
48005302 |
Tubewell with Submersible pump and sock pit at mouza Kalaberia near the H/o Gorachand halder |
200000 |
Tubewell with Submersible pump and sock pit at mouza Kalaberia near the H/o Gorachand halder1 |
Plinth level |
-
latitude : 22.0601836
Longitude : 87.7830362
file name : Image_10052022141137966.png
|
2022-05-10 14:11:38.050804 |
779 |
48005302 |
Tubewell with Submersible pump and sock pit at mouza Kalaberia near the H/o Gorachand halder |
200000 |
Tubewell with Submersible pump and sock pit at mouza Kalaberia near the H/o Gorachand halder1 |
Completion of work |
-
latitude : 22.0601853
Longitude : 87.7830444
file name : Image_10052022140545164.png
|
2022-05-10 14:05:45.385689 |
780 |
47456421 |
Upgradation of concrete road at mouza Purba Radhapur from the H/o Prabodh Sahoo to the H/o Suchibrat |
199951 |
Upgradation of concrete road at mouza Purba Radhapur from the H/o Prabodh Sahoo to the H/o Suchibrat1 |
Roof laid |
-
latitude : 22.01956724,22.01971362
Longitude : 87.75026394,87.75076384
file name : Image_24012023162220490.png
|
2023-01-24 16:22:20.593686 |
781 |
47456421 |
Upgradation of concrete road at mouza Purba Radhapur from the H/o Prabodh Sahoo to the H/o Suchibrat |
199951 |
Upgradation of concrete road at mouza Purba Radhapur from the H/o Prabodh Sahoo to the H/o Suchibrat1 |
Plinth level |
-
latitude : 22.01952032,22.01951885
Longitude : 87.75010818,87.75010717
file name : Image_24012023161610368.png
|
2023-01-24 16:16:10.461994 |
782 |
47456421 |
Upgradation of concrete road at mouza Purba Radhapur from the H/o Prabodh Sahoo to the H/o Suchibrat |
199951 |
Upgradation of concrete road at mouza Purba Radhapur from the H/o Prabodh Sahoo to the H/o Suchibrat1 |
Completion of work |
-
latitude : 22.01947682,22.01948105
Longitude : 87.75023744,87.7502179
file name : Image_24012023155230986.png
|
2023-01-24 15:52:31.113015 |
783 |
47468123 |
Upgradation of concrete road at mouza Kotebarh from the H/o SK Jabed to the H/o Sekender Mir |
199909 |
Upgradation of concrete road at mouza Kotebarh from the H/o SK Jabed to the H/o Sekender Mir1 |
Roof laid |
-
latitude : 22.05012709,22.05012576
Longitude : 87.77609622,87.77608219
file name : Image_18012023135409161.png
|
2023-01-18 13:54:09.2748 |
784 |
47468123 |
Upgradation of concrete road at mouza Kotebarh from the H/o SK Jabed to the H/o Sekender Mir |
199909 |
Upgradation of concrete road at mouza Kotebarh from the H/o SK Jabed to the H/o Sekender Mir1 |
Plinth level |
-
latitude : 22.05012231,22.05013527
Longitude : 87.77598965,87.77579272
file name : Image_18012023134657956.png
|
2023-01-18 13:46:58.067461 |
785 |
47468123 |
Upgradation of concrete road at mouza Kotebarh from the H/o SK Jabed to the H/o Sekender Mir |
199909 |
Upgradation of concrete road at mouza Kotebarh from the H/o SK Jabed to the H/o Sekender Mir1 |
Completion of work |
-
latitude : 22.05033255,22.05033255
Longitude : 87.77535255,87.77535255
file name : Image_18012023132505504.png
|
2023-01-18 13:25:05.686925 |
786 |
47543325 |
Upgradation of concrete road at mouza the H/O Amal Patra to the H/O Harekrishna Patra's pond side |
149987 |
Upgradation of concrete road at mouza the H/O Amal Patra to the H/O Harekrishna Patra's pond side1 |
Roof laid |
-
latitude : 22.02808798,22.02803854
Longitude : 87.75812115,87.75806152
file name : Image_31012023163951813.png
|
2023-01-31 16:39:51.918961 |
787 |
47543325 |
Upgradation of concrete road at mouza the H/O Amal Patra to the H/O Harekrishna Patra's pond side |
149987 |
Upgradation of concrete road at mouza the H/O Amal Patra to the H/O Harekrishna Patra's pond side1 |
Plinth level |
-
latitude : 22.02751542,22.02751754
Longitude : 87.75825545,87.75823695
file name : Image_31012023161632656.png
|
2023-01-31 16:16:32.745296 |
788 |
47543325 |
Upgradation of concrete road at mouza the H/O Amal Patra to the H/O Harekrishna Patra's pond side |
149987 |
Upgradation of concrete road at mouza the H/O Amal Patra to the H/O Harekrishna Patra's pond side1 |
Completion of work |
-
latitude : 22.02798455,22.02804505
Longitude : 87.75797753,87.75803806
file name : Image_31012023160653144.png
|
2023-01-31 16:06:53.240287 |
789 |
47468813 |
Upgradation of concrete road withu.c bullah pilling at mouza Sukrullapur from the bank of Bhakti K |
179845 |
Upgradation of concrete road withu.c bullah pilling at mouza Sukrullapur from the bank of Bhakti K1 |
Roof laid |
-
latitude : 22.00912138,22.00913756
Longitude : 87.7807404,87.78074934
file name : Image_02022023154554509.png
|
2023-02-02 15:45:54.604794 |
790 |
47468813 |
Upgradation of concrete road withu.c bullah pilling at mouza Sukrullapur from the bank of Bhakti K |
179845 |
Upgradation of concrete road withu.c bullah pilling at mouza Sukrullapur from the bank of Bhakti K1 |
Plinth level |
-
latitude : 22.00908753,22.00908055
Longitude : 87.77985614,87.77985224
file name : Image_02022023152529353.png
|
2023-02-02 15:25:29.441412 |
791 |
47468813 |
Upgradation of concrete road withu.c bullah pilling at mouza Sukrullapur from the bank of Bhakti K |
179845 |
Upgradation of concrete road withu.c bullah pilling at mouza Sukrullapur from the bank of Bhakti K1 |
Completion of work |
-
latitude : 22.00908642,22.00909727
Longitude : 87.7798592,87.77985332
file name : Image_02022023151855444.png
|
2023-02-02 15:18:55.535021 |
792 |
47980360 |
Construction of cover Concrete drain at mouza Kotebarh from the H/o Ainal Khan to the H/o Sk Ajij |
199972 |
Construction of cover Concrete drain at mouza Kotebarh from the H/o Ainal Khan to the H/o Sk Ajij1 |
Roof laid |
-
latitude : 22.0469337,22.0469223,22.0469323
Longitude : 87.7785943,87.778597,87.7785879
file name : Image_01022023125408630.png
|
2023-02-01 12:54:08.745158 |
793 |
47980360 |
Construction of cover Concrete drain at mouza Kotebarh from the H/o Ainal Khan to the H/o Sk Ajij |
199972 |
Construction of cover Concrete drain at mouza Kotebarh from the H/o Ainal Khan to the H/o Sk Ajij1 |
Plinth level |
-
latitude : 22.0469424,22.0469755,22.0469755
Longitude : 87.7786056,87.7785638,87.7785638
file name : Image_21012023145805768.png
|
2023-01-21 14:58:05.889085 |
794 |
47980360 |
Construction of cover Concrete drain at mouza Kotebarh from the H/o Ainal Khan to the H/o Sk Ajij |
199972 |
Construction of cover Concrete drain at mouza Kotebarh from the H/o Ainal Khan to the H/o Sk Ajij1 |
Completion of work |
-
latitude : 22.0469789,22.0469592
Longitude : 87.7785626,87.7785813
file name : Image_21012023142639290.png
|
2023-01-21 14:26:39.387624 |
795 |
49123255 |
TUBEWELL NEAR THE HOUSE OF PRABHAT CHAR AT SHYAMCHAK |
199999 |
TUBEWELL NEAR THE HOUSE OF PRABHAT CHAR AT SHYAMCHAK1 |
Roof laid |
-
latitude : 22.06007917
Longitude : 87.75714373
file name : Image_24012023140012378.png
|
2023-01-24 14:00:12.515785 |
796 |
49123255 |
TUBEWELL NEAR THE HOUSE OF PRABHAT CHAR AT SHYAMCHAK |
199999 |
TUBEWELL NEAR THE HOUSE OF PRABHAT CHAR AT SHYAMCHAK1 |
Plinth level |
-
latitude : 22.06014919
Longitude : 87.75716298
file name : Image_24012023134717556.png
|
2023-01-24 13:47:17.673804 |
797 |
49123255 |
TUBEWELL NEAR THE HOUSE OF PRABHAT CHAR AT SHYAMCHAK |
199999 |
TUBEWELL NEAR THE HOUSE OF PRABHAT CHAR AT SHYAMCHAK1 |
Completion of work |
-
latitude : 22.06019955
Longitude : 87.75715941
file name : Image_24012023133335177.png
|
2023-01-24 13:33:35.29876 |
798 |
47984599 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Debabrata maity |
199999 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Debabrata maity1 |
Roof laid |
-
latitude : 22.05206501
Longitude : 87.77997912
file name : Image_24012023130353527.png
|
2023-01-24 13:03:53.642564 |
799 |
47984599 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Debabrata maity |
199999 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Debabrata maity1 |
Roof laid |
-
latitude : 22.05205229
Longitude : 87.78001388
file name : Image_24012023130455506.png
|
2023-01-24 13:04:55.601232 |
800 |
47984599 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Debabrata maity |
199999 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Debabrata maity1 |
Plinth level |
-
latitude : 22.05205812
Longitude : 87.7799815
file name : Image_24012023125453561.png
|
2023-01-24 12:54:53.672038 |
801 |
47984599 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Debabrata maity |
199999 |
Tubewell with Submersible Pump and sock pit at mouza Kotebarh near the H/o Debabrata maity1 |
Completion of work |
-
latitude : 22.05204486
Longitude : 87.77996461
file name : Image_24012023124323142.png
|
2023-01-24 12:43:23.253129 |
802 |
47471894 |
Upgradation of concrete road at mouza Dwarikachak from the H/o Prasanta Manik to the H/o Sankar |
199917 |
Upgradation of concrete road at mouza Dwarikachak from the H/o Prasanta Manik to the H/o Sankar 1 |
Roof laid |
-
latitude : 22.04721642,22.04724148
Longitude : 87.75164345,87.75163456
file name : Image_30012023163930992.png
|
2023-01-30 16:39:31.101074 |
803 |
47471894 |
Upgradation of concrete road at mouza Dwarikachak from the H/o Prasanta Manik to the H/o Sankar |
199917 |
Upgradation of concrete road at mouza Dwarikachak from the H/o Prasanta Manik to the H/o Sankar 1 |
Plinth level |
-
latitude : 22.047802,22.04776708
Longitude : 87.75152775,87.75151869
file name : Image_30012023162949567.png
|
2023-01-30 16:29:49.677415 |
804 |
47471894 |
Upgradation of concrete road at mouza Dwarikachak from the H/o Prasanta Manik to the H/o Sankar |
199917 |
Upgradation of concrete road at mouza Dwarikachak from the H/o Prasanta Manik to the H/o Sankar 1 |
Completion of work |
-
latitude : 22.04791914,22.04792864
Longitude : 87.75150584,87.75150494
file name : Image_30012023162519248.png
|
2023-01-30 16:25:19.349178 |
805 |
49137790 |
TUBEWELL NEAR THE HOUSE OF NANDAN MAITY AT DAYALCHAK |
199999 |
TUBEWELL NEAR THE HOUSE OF NANDAN MAITY AT DAYALCHAK1 |
Roof laid |
-
latitude : 22.02829157
Longitude : 87.75524574
file name : Image_30012023172929666.png
|
2023-01-30 17:29:29.753593 |
806 |
49137790 |
TUBEWELL NEAR THE HOUSE OF NANDAN MAITY AT DAYALCHAK |
199999 |
TUBEWELL NEAR THE HOUSE OF NANDAN MAITY AT DAYALCHAK1 |
Roof laid |
-
latitude : 22.02832348
Longitude : 87.75524796
file name : Image_30012023173450358.png
|
2023-01-30 17:34:50.457121 |
807 |
49137790 |
TUBEWELL NEAR THE HOUSE OF NANDAN MAITY AT DAYALCHAK |
199999 |
TUBEWELL NEAR THE HOUSE OF NANDAN MAITY AT DAYALCHAK1 |
Plinth level |
-
latitude : 22.02824102
Longitude : 87.75525399
file name : Image_30012023172347321.png
|
2023-01-30 17:23:47.405308 |
808 |
49137790 |
TUBEWELL NEAR THE HOUSE OF NANDAN MAITY AT DAYALCHAK |
199999 |
TUBEWELL NEAR THE HOUSE OF NANDAN MAITY AT DAYALCHAK1 |
Completion of work |
-
latitude : 22.02826258
Longitude : 87.75527433
file name : Image_30012023171454314.png
|
2023-01-30 17:14:54.391607 |
809 |
49137887 |
TUBEWELL NEAR THE HOUSE OF KALIPADA HATUA AT DAYALCHAK |
199999 |
TUBEWELL NEAR THE HOUSE OF KALIPADA HATUA AT DAYALCHAK1 |
Roof laid |
-
latitude : 22.02120109
Longitude : 87.75469972
file name : Image_24012023151215466.png
|
2023-01-24 15:12:15.559573 |
810 |
49137887 |
TUBEWELL NEAR THE HOUSE OF KALIPADA HATUA AT DAYALCHAK |
199999 |
TUBEWELL NEAR THE HOUSE OF KALIPADA HATUA AT DAYALCHAK1 |
Plinth level |
-
latitude : 22.02117052
Longitude : 87.75453482
file name : Image_24012023150717860.png
|
2023-01-24 15:07:17.956311 |
811 |
49137887 |
TUBEWELL NEAR THE HOUSE OF KALIPADA HATUA AT DAYALCHAK |
199999 |
TUBEWELL NEAR THE HOUSE OF KALIPADA HATUA AT DAYALCHAK1 |
Completion of work |
-
latitude : 22.02118387
Longitude : 87.75466402
file name : Image_24012023150111217.png
|
2023-01-24 15:01:11.339756 |
812 |
34007060 |
Water Pipe line at mouza Deuribarh |
100000 |
Water Pipe line at mouza Deuribarh1 |
Roof laid |
-
latitude : 22.02000443,22.02000665
Longitude : 87.7657199,87.76572097
file name : Image_11022022134953710.png
|
2022-02-11 13:49:53.825769 |
813 |
34007060 |
Water Pipe line at mouza Deuribarh |
100000 |
Water Pipe line at mouza Deuribarh1 |
Plinth level |
-
latitude : 22.02000496,22.020007
Longitude : 87.76572683,87.76572996
file name : Image_11022022134634028.png
|
2022-02-11 13:46:34.144562 |
814 |
34007060 |
Water Pipe line at mouza Deuribarh |
100000 |
Water Pipe line at mouza Deuribarh1 |
Completion of work |
-
latitude : 22.01997369,22.01999094
Longitude : 87.76571449,87.76571401
file name : Image_11022022134310348.png
|
2022-02-11 13:43:10.463818 |
815 |
56634297 |
PIPELINE AT MOUZA KOTEBARH20 FROM THE HO OF PALLI SHITALA MANDIR TO THE HO GOPAL CHINI AND RAJKUMAR |
57237 |
PIPELINE AT MOUZA KOTEBARH20 FROM THE HO OF PALLI SHITALA MANDIR TO THE HO GOPAL CHINI AND RAJKUMAR 1 |
Roof laid |
-
latitude : 22.05019987,22.05020949
Longitude : 87.78078895,87.78104788
file name : Image_30072024122953249.png
|
2024-07-30 12:29:53.324502 |
816 |
56634297 |
PIPELINE AT MOUZA KOTEBARH20 FROM THE HO OF PALLI SHITALA MANDIR TO THE HO GOPAL CHINI AND RAJKUMAR |
57237 |
PIPELINE AT MOUZA KOTEBARH20 FROM THE HO OF PALLI SHITALA MANDIR TO THE HO GOPAL CHINI AND RAJKUMAR 1 |
Plinth level |
-
latitude : 22.05010657,22.04995849
Longitude : 87.78114807,87.78108052
file name : Image_30072024122626662.png
|
2024-07-30 12:26:26.736097 |
817 |
56634297 |
PIPELINE AT MOUZA KOTEBARH20 FROM THE HO OF PALLI SHITALA MANDIR TO THE HO GOPAL CHINI AND RAJKUMAR |
57237 |
PIPELINE AT MOUZA KOTEBARH20 FROM THE HO OF PALLI SHITALA MANDIR TO THE HO GOPAL CHINI AND RAJKUMAR 1 |
Completion of work |
-
latitude : 22.0501655,22.05016941
Longitude : 87.78117068,87.78116487
file name : Image_30072024121752967.png
|
2024-07-30 12:17:53.02786 |
818 |
99370133 |
Construction of roads |
250000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.0377392,22.0377381
Longitude : 87.7669108,87.7669051
file name : Image_20082024165604690.png
|
2024-08-20 16:56:04.753426 |
819 |
99370133 |
Construction of roads |
250000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.037747,22.037747
Longitude : 87.7669155,87.7669155
file name : Image_20082024165241617.png
|
2024-08-20 16:52:41.679019 |
820 |
99370133 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.0377494,22.0377494,22.037738
Longitude : 87.7669264,87.7669264,87.7669086
file name : Image_20082024164725434.png
|
2024-08-20 16:47:25.507132 |
821 |
68256945 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.0582711,22.0582711
Longitude : 87.7797577,87.7797577
file name : Image_20082024160116375.png
|
2024-08-20 16:01:16.501387 |
822 |
68256945 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.0581992,22.0583051
Longitude : 87.7797755,87.7797339
file name : Image_20082024155433733.png
|
2024-08-20 15:54:33.8152 |
823 |
68256945 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.058227,22.058227
Longitude : 87.7798683,87.7798683
file name : Image_20082024154608409.png
|
2024-08-20 15:46:08.474736 |
824 |
34023461 |
Sinking of TubeWell with Pump at mouza BalaramChak |
250000 |
Sinking of TubeWell with Pump at mouza BalaramChak1 |
Roof laid |
-
latitude : 22.0424867
Longitude : 87.7695337
file name : Image_20022022163747308.png
|
2022-02-20 16:37:47.383051 |
825 |
34023461 |
Sinking of TubeWell with Pump at mouza BalaramChak |
250000 |
Sinking of TubeWell with Pump at mouza BalaramChak1 |
Plinth level |
-
latitude : 22.01694819610566
Longitude : 87.78096238151193
file name : Image_16022022104614878.png
|
2022-02-16 10:46:14.964216 |
826 |
34023461 |
Sinking of TubeWell with Pump at mouza BalaramChak |
250000 |
Sinking of TubeWell with Pump at mouza BalaramChak1 |
Plinth level |
-
latitude : 22.04196779988706
Longitude : 87.76936409063637
file name : Image_12022022093035713.png
|
2022-02-12 09:30:35.821771 |
827 |
34023461 |
Sinking of TubeWell with Pump at mouza BalaramChak |
250000 |
Sinking of TubeWell with Pump at mouza BalaramChak1 |
Completion of work |
-
latitude : 22.041901666671038
Longitude : 87.76942980475724
file name : Image_09022022110308745.png
|