1 |
34418063 |
Construction of Concrete road from land Balaram to Gorachand Mandal at Neturia |
239915 |
Construction of Concrete road from land Balaram to Gorachand Mandal at Neturia1 |
Roof laid |
-
latitude : 21.998197459615767,21.998197459615767
Longitude : 87.69783636555076,87.69783636555076
file name : Image_09032021152154869.png
|
2021-03-09 15:21:54.985203 |
2 |
34418063 |
Construction of Concrete road from land Balaram to Gorachand Mandal at Neturia |
239915 |
Construction of Concrete road from land Balaram to Gorachand Mandal at Neturia1 |
Plinth level |
-
latitude : 21.998163764365017,21.998163764365017
Longitude : 87.69782111048698,87.69782111048698
file name : Image_09032021150357654.png
|
2021-03-09 15:03:57.750789 |
3 |
34418063 |
Construction of Concrete road from land Balaram to Gorachand Mandal at Neturia |
239915 |
Construction of Concrete road from land Balaram to Gorachand Mandal at Neturia1 |
Completion of work |
-
latitude : 21.998261958360672,21.998261958360672
Longitude : 87.69783720374107,87.69783720374107
file name : Image_09032021145929510.png
|
2021-03-09 14:59:29.627845 |
4 |
34418356 |
Construction Concrete road from land of Kalachand Mandal to Concrete road at Neturia |
235000 |
Construction Concrete road from land of Kalachand Mandal to Concrete road at Neturia1 |
Roof laid |
-
latitude : 21.999075044877827,21.99907927773893
Longitude : 87.69799914211035,87.69800148904324
file name : Image_09032021155956488.png
|
2021-03-09 15:59:56.599894 |
5 |
34418356 |
Construction Concrete road from land of Kalachand Mandal to Concrete road at Neturia |
235000 |
Construction Concrete road from land of Kalachand Mandal to Concrete road at Neturia1 |
Plinth level |
-
latitude : 21.999049270525575,21.999049270525575
Longitude : 87.69799428060651,87.69799428060651
file name : Image_09032021155713999.png
|
2021-03-09 15:57:14.108743 |
6 |
34418356 |
Construction Concrete road from land of Kalachand Mandal to Concrete road at Neturia |
235000 |
Construction Concrete road from land of Kalachand Mandal to Concrete road at Neturia1 |
Completion of work |
-
latitude : 21.999112931080163,21.999113517813385
Longitude : 87.69800936803222,87.69801624119282
file name : Image_09032021153351400.png
|
2021-03-09 15:33:51.503894 |
7 |
34462202 |
Construction Concrete road from house of Jiban Sahoo to Ramkrishna Pramanik at Basudevberia |
349418 |
Construction Concrete road from house of Jiban Sahoo to Ramkrishna Pramanik at Basudevberia1 |
Roof laid |
-
latitude : 22.022894066758454,22.02289381530136
Longitude : 87.70377527922392,87.70377519540489
file name : Image_11032021163727367.png
|
2021-03-11 16:37:27.478011 |
8 |
34462202 |
Construction Concrete road from house of Jiban Sahoo to Ramkrishna Pramanik at Basudevberia |
349418 |
Construction Concrete road from house of Jiban Sahoo to Ramkrishna Pramanik at Basudevberia1 |
Plinth level |
-
latitude : 22.02289167791605,22.02289167791605
Longitude : 87.70372750237584,87.70372750237584
file name : Image_11032021163351063.png
|
2021-03-11 16:33:51.178082 |
9 |
34462202 |
Construction Concrete road from house of Jiban Sahoo to Ramkrishna Pramanik at Basudevberia |
349418 |
Construction Concrete road from house of Jiban Sahoo to Ramkrishna Pramanik at Basudevberia1 |
Completion of work |
-
latitude : 22.022895659320056,22.022895659320056
Longitude : 87.70370495505631,87.70370495505631
file name : Image_11032021162535631.png
|
2021-03-11 16:25:35.752408 |
10 |
47084574 |
275 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Purnendu Maity(D. Barb |
250000 |
275 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Purnendu Maity(D. Barb1 |
Completion of work |
-
latitude : 22.032875949516892
Longitude : 87.71497895009816
file name : Image_19082022113433804.png
|
2022-08-19 11:34:33.903243 |
11 |
39041028 |
Installation of New Solar Sub-Marsible Pump with pipe line near Barbaria Hospital at Khatial sansad |
585000 |
Installation of New Solar Sub-Marsible Pump with pipe line near Barbaria Hospital at Khatial sansad 1 |
Roof laid |
-
latitude : 22.0362852
Longitude : 87.7124086
file name : Image_05012022105539223.png
|
2022-01-05 10:55:39.354433 |
12 |
39041028 |
Installation of New Solar Sub-Marsible Pump with pipe line near Barbaria Hospital at Khatial sansad |
585000 |
Installation of New Solar Sub-Marsible Pump with pipe line near Barbaria Hospital at Khatial sansad 1 |
Plinth level |
-
latitude : 22.0361954
Longitude : 87.712246
file name : Image_04112021093257354.png
|
2021-11-04 09:32:57.449986 |
13 |
39041028 |
Installation of New Solar Sub-Marsible Pump with pipe line near Barbaria Hospital at Khatial sansad |
585000 |
Installation of New Solar Sub-Marsible Pump with pipe line near Barbaria Hospital at Khatial sansad 1 |
Completion of work |
-
latitude : 22.036143634468317
Longitude : 87.7118856087327
file name : Image_04112021092711209.png
|
2021-11-04 09:27:11.342681 |
14 |
34402009 |
Construction of Concrete road from the house Bhola Dhauria to Sitala Mandir at Barbaria |
349418 |
Construction of Concrete road from the house Bhola Dhauria to Sitala Mandir at Barbaria1 |
Roof laid |
-
latitude : 22.03920839354396,22.039210530929267
Longitude : 87.71237997338176,87.71237486042082
file name : Image_11032021160543068.png
|
2021-03-11 16:05:43.152436 |
15 |
34402009 |
Construction of Concrete road from the house Bhola Dhauria to Sitala Mandir at Barbaria |
349418 |
Construction of Concrete road from the house Bhola Dhauria to Sitala Mandir at Barbaria1 |
Plinth level |
-
latitude : 22.0392045378685,22.0392045378685
Longitude : 87.71238148212433,87.71238148212433
file name : Image_11032021155939332.png
|
2021-03-11 15:59:39.441402 |
16 |
34402009 |
Construction of Concrete road from the house Bhola Dhauria to Sitala Mandir at Barbaria |
349418 |
Construction of Concrete road from the house Bhola Dhauria to Sitala Mandir at Barbaria1 |
Completion of work |
-
latitude : 22.039187103509903,22.039186055772007
Longitude : 87.71240671165287,87.71240687929094
file name : Image_11032021154714510.png
|
2021-03-11 15:47:14.626553 |
17 |
34422756 |
Construction of Concrete road from house of Arjun Maji to Subrata Maji at Manikjore H |
349418 |
Construction of Concrete road from house of Arjun Maji to Subrata Maji at Manikjore H1 |
Roof laid |
-
latitude : 22.02469571493566,22.02469571493566
Longitude : 87.69321475178003,87.69321475178003
file name : Image_11032021165806072.png
|
2021-03-11 16:58:06.177479 |
18 |
34422756 |
Construction of Concrete road from house of Arjun Maji to Subrata Maji at Manikjore H |
349418 |
Construction of Concrete road from house of Arjun Maji to Subrata Maji at Manikjore H1 |
Plinth level |
-
latitude : 22.024673335254192,22.024673335254192
Longitude : 87.69323218613863,87.69323218613863
file name : Image_11032021165431408.png
|
2021-03-11 16:54:31.52528 |
19 |
34422756 |
Construction of Concrete road from house of Arjun Maji to Subrata Maji at Manikjore H |
349418 |
Construction of Concrete road from house of Arjun Maji to Subrata Maji at Manikjore H1 |
Completion of work |
-
latitude : 22.02464969828725,22.02464969828725
Longitude : 87.6931990776211,87.6931990776211
file name : Image_11032021165024291.png
|
2021-03-11 16:50:24.409043 |
20 |
34457603 |
Construction Concrete road from pond side of Rampada Sahoo to PMGSY Road at Manikjore |
349265 |
Construction Concrete road from pond side of Rampada Sahoo to PMGSY Road at Manikjore1 |
Roof laid |
-
latitude : 22.021449781022966,22.021449781022966
Longitude : 87.67956943251193,87.67956943251193
file name : Image_11032021131121864.png
|
2021-03-11 13:11:21.947222 |
21 |
34457603 |
Construction Concrete road from pond side of Rampada Sahoo to PMGSY Road at Manikjore |
349265 |
Construction Concrete road from pond side of Rampada Sahoo to PMGSY Road at Manikjore1 |
Plinth level |
-
latitude : 22.021449990570545,22.021449990570545
Longitude : 87.67955593764782,87.67955593764782
file name : Image_11032021130557581.png
|
2021-03-11 13:05:57.658821 |
22 |
34457603 |
Construction Concrete road from pond side of Rampada Sahoo to PMGSY Road at Manikjore |
349265 |
Construction Concrete road from pond side of Rampada Sahoo to PMGSY Road at Manikjore1 |
Completion of work |
-
latitude : 22.021425096318126,22.021425096318126
Longitude : 87.67954696901143,87.67954696901143
file name : Image_11032021130150661.png
|
2021-03-11 13:01:50.74538 |
23 |
34410260 |
Construction Concrete road from house of Anil Karan to house of Biren Pradhan at Dakshin Patharberia |
350000 |
Construction Concrete road from house of Anil Karan to house of Biren Pradhan at Dakshin Patharberia1 |
Roof laid |
-
latitude : 22.0043804962188,22.0043804962188
Longitude : 87.68587790429592,87.68587790429592
file name : Image_02122021122610494.png
|
2021-12-02 12:26:10.598538 |
24 |
34410260 |
Construction Concrete road from house of Anil Karan to house of Biren Pradhan at Dakshin Patharberia |
350000 |
Construction Concrete road from house of Anil Karan to house of Biren Pradhan at Dakshin Patharberia1 |
Plinth level |
-
latitude : 22.004357613623142,22.004357613623142
Longitude : 87.68585200421512,87.68585200421512
file name : Image_29112021120615931.png
|
2021-11-29 12:06:16.055965 |
25 |
34410260 |
Construction Concrete road from house of Anil Karan to house of Biren Pradhan at Dakshin Patharberia |
350000 |
Construction Concrete road from house of Anil Karan to house of Biren Pradhan at Dakshin Patharberia1 |
Completion of work |
-
latitude : 22.00456829275936,22.004400109872222
Longitude : 87.68564647994936,87.68584387376904
file name : Image_22112021154748037.png
|
2021-11-22 15:47:48.155546 |
26 |
55092818 |
INSTALLATION of new submarsible pump near the house Prahallad Kayal at Dakshin Patharberia west |
162500 |
INSTALLATION of new submarsible pump near the house Prahallad Kayal at Dakshin Patharberia west 1 |
Roof laid |
-
latitude : 22.009106632322073
Longitude : 87.69556185230613
file name : Image_28122021123759628.png
|
2021-12-28 12:37:59.750895 |
27 |
55092818 |
INSTALLATION of new submarsible pump near the house Prahallad Kayal at Dakshin Patharberia west |
162500 |
INSTALLATION of new submarsible pump near the house Prahallad Kayal at Dakshin Patharberia west 1 |
Plinth level |
-
latitude : 22.009124527685344
Longitude : 87.69560166634619
file name : Image_28122021122437963.png
|
2021-12-28 12:24:38.061854 |
28 |
55092818 |
INSTALLATION of new submarsible pump near the house Prahallad Kayal at Dakshin Patharberia west |
162500 |
INSTALLATION of new submarsible pump near the house Prahallad Kayal at Dakshin Patharberia west 1 |
Completion of work |
-
latitude : 22.009124611504376
Longitude : 87.69552882760763
file name : Image_28122021122052872.png
|
2021-12-28 12:20:52.978622 |
29 |
55092881 |
INSTALLATION of new submarsible pump near the house of Janardan Ghorai at Kismat Khatial |
162500 |
INSTALLATION of new submarsible pump near the house of Janardan Ghorai at Kismat Khatial1 |
Roof laid |
-
latitude : 22.05097679514438
Longitude : 87.70396219566464
file name : Image_02022022135222402.png
|
2022-02-02 13:52:22.538502 |
30 |
55092881 |
INSTALLATION of new submarsible pump near the house of Janardan Ghorai at Kismat Khatial |
162500 |
INSTALLATION of new submarsible pump near the house of Janardan Ghorai at Kismat Khatial1 |
Plinth level |
-
latitude : 22.050915816798806
Longitude : 87.70395850762725
file name : Image_02022022134710598.png
|
2022-02-02 13:47:10.716778 |
31 |
55092881 |
INSTALLATION of new submarsible pump near the house of Janardan Ghorai at Kismat Khatial |
162500 |
INSTALLATION of new submarsible pump near the house of Janardan Ghorai at Kismat Khatial1 |
Completion of work |
-
latitude : 22.050939328037202
Longitude : 87.70388868637383
file name : Image_02022022134043824.png
|
2022-02-02 13:40:43.930654 |
32 |
55092095 |
INSTALLATION of submarsible pump near the house of Nishikanta Paloi at Laudighi Sansad |
162500 |
INSTALLATION of submarsible pump near the house of Nishikanta Paloi at Laudighi Sansad1 |
Roof laid |
-
latitude : 22.00394405052066
Longitude : 87.68117900937796
file name : Image_02012022123832590.png
|
2022-01-02 12:38:32.680878 |
33 |
55092095 |
INSTALLATION of submarsible pump near the house of Nishikanta Paloi at Laudighi Sansad |
162500 |
INSTALLATION of submarsible pump near the house of Nishikanta Paloi at Laudighi Sansad1 |
Plinth level |
-
latitude : 22.003988684155047
Longitude : 87.68120809458196
file name : Image_02012022123538678.png
|
2022-01-02 12:35:38.765112 |
34 |
55092095 |
INSTALLATION of submarsible pump near the house of Nishikanta Paloi at Laudighi Sansad |
162500 |
INSTALLATION of submarsible pump near the house of Nishikanta Paloi at Laudighi Sansad1 |
Completion of work |
-
latitude : 22.00262796599418
Longitude : 87.68195047974586
file name : Image_02012022122755815.png
|
2022-01-02 12:27:55.924474 |
35 |
55091917 |
INSTALLATION of submarsible pump near house of Pradip Giri at Basudevberia Horizone sansad |
162500 |
INSTALLATION of submarsible pump near house of Pradip Giri at Basudevberia Horizone sansad1 |
Roof laid |
-
latitude : 22.01369207818061
Longitude : 87.6990997698158
file name : Image_02022022144922392.png
|
2022-02-02 14:49:22.562648 |
36 |
55091917 |
INSTALLATION of submarsible pump near house of Pradip Giri at Basudevberia Horizone sansad |
162500 |
INSTALLATION of submarsible pump near house of Pradip Giri at Basudevberia Horizone sansad1 |
Plinth level |
-
latitude : 22.013707919977605
Longitude : 87.69917478784919
file name : Image_02022022141614312.png
|
2022-02-02 14:16:14.436433 |
37 |
55091917 |
INSTALLATION of submarsible pump near house of Pradip Giri at Basudevberia Horizone sansad |
162500 |
INSTALLATION of submarsible pump near house of Pradip Giri at Basudevberia Horizone sansad1 |
Completion of work |
-
latitude : 22.013609893620014
Longitude : 87.69935022108257
file name : Image_08012022124231867.png
|
2022-01-08 12:42:31.986695 |
38 |
39040733 |
Construction of Rain Water Harvesting at Manikjore K.K. High School at Sansad |
300000 |
Construction of Rain Water Harvesting at Manikjore K.K. High School at Sansad1 |
Roof laid |
-
latitude : 22.022178629413247
Longitude : 87.67484799027443
file name : Image_30032022082233339.png
|
2022-03-30 08:22:33.44048 |
39 |
39040733 |
Construction of Rain Water Harvesting at Manikjore K.K. High School at Sansad |
300000 |
Construction of Rain Water Harvesting at Manikjore K.K. High School at Sansad1 |
Plinth level |
-
latitude : 22.0218778
Longitude : 87.674912
file name : Image_22022022152352985.png
|
2022-02-22 15:23:53.088548 |
40 |
39040733 |
Construction of Rain Water Harvesting at Manikjore K.K. High School at Sansad |
300000 |
Construction of Rain Water Harvesting at Manikjore K.K. High School at Sansad1 |
Completion of work |
-
latitude : 22.022043974138796
Longitude : 87.67477112822235
file name : Image_20012022141815445.png
|
2022-01-20 14:18:15.541267 |
41 |
34473371 |
Repairing of Sub-Marsible pump of GP |
54970 |
Repairing of Sub-Marsible pump of GP1 |
Completion of work |
-
latitude : 21.997636584565043
Longitude : 87.72068878635764
file name : Image_31032022223236058.png
|
2022-03-31 22:32:36.157188 |
42 |
47129029 |
311 Improvement of Tali pilling from the pond side of Prafulla Giri at D. Patharberia(W) Sansad. |
115000 |
311 Improvement of Tali pilling from the pond side of Prafulla Giri at D. Patharberia(W) Sansad.1 |
Roof laid |
-
latitude : 22.01304558198899,22.01304558198899
Longitude : 87.69846567884088,87.69846567884088
file name : Image_26042022172738576.png
|
2022-04-26 17:27:38.739397 |
43 |
47129029 |
311 Improvement of Tali pilling from the pond side of Prafulla Giri at D. Patharberia(W) Sansad. |
115000 |
311 Improvement of Tali pilling from the pond side of Prafulla Giri at D. Patharberia(W) Sansad.1 |
Plinth level |
-
latitude : 22.01306641101837,22.01306641101837
Longitude : 87.69849828444421,87.69849828444421
file name : Image_09042022080217900.png
|
2022-04-09 08:02:17.99132 |
44 |
47129029 |
311 Improvement of Tali pilling from the pond side of Prafulla Giri at D. Patharberia(W) Sansad. |
115000 |
311 Improvement of Tali pilling from the pond side of Prafulla Giri at D. Patharberia(W) Sansad.1 |
Completion of work |
-
latitude : 22.013039463199675,22.013039463199675
Longitude : 87.69848093390465,87.69848093390465
file name : Image_08042022072926128.png
|
2022-04-08 07:29:26.251936 |
45 |
39040521 |
Construction of Rain Water Harvesting at Barbaria Hazra Vidyapith at Barbaria Sansad |
300000 |
Construction of Rain Water Harvesting at Barbaria Hazra Vidyapith at Barbaria Sansad1 |
Roof laid |
-
latitude : 22.03812855295837
Longitude : 87.71410371176898
file name : Image_06052022081036107.png
|
2022-05-06 08:10:36.204035 |
46 |
39040521 |
Construction of Rain Water Harvesting at Barbaria Hazra Vidyapith at Barbaria Sansad |
300000 |
Construction of Rain Water Harvesting at Barbaria Hazra Vidyapith at Barbaria Sansad1 |
Plinth level |
-
latitude : 22.038095863536
Longitude : 87.71412642672658
file name : Image_27042022082312628.png
|
2022-04-27 08:23:12.708553 |
47 |
39040521 |
Construction of Rain Water Harvesting at Barbaria Hazra Vidyapith at Barbaria Sansad |
300000 |
Construction of Rain Water Harvesting at Barbaria Hazra Vidyapith at Barbaria Sansad1 |
Completion of work |
-
latitude : 22.038060827180743
Longitude : 87.7141441963613
file name : Image_02122021152856141.png
|
2021-12-02 15:28:56.233424 |
48 |
61228504 |
Construction of Cerematorium at Simuldari Crematium Ground at Simuldari Sansad |
350000 |
Construction of Cerematorium at Simuldari Crematium Ground at Simuldari Sansad1 |
Roof laid |
-
latitude : 22.042721584439278
Longitude : 87.72185169160366
file name : Image_26042022165206946.png
|
2022-04-26 16:52:07.092667 |
49 |
61228504 |
Construction of Cerematorium at Simuldari Crematium Ground at Simuldari Sansad |
350000 |
Construction of Cerematorium at Simuldari Crematium Ground at Simuldari Sansad1 |
Plinth level |
-
latitude : 22.042725146748126
Longitude : 87.72189703769982
file name : Image_26042022164722095.png
|
2022-04-26 16:47:22.21265 |
50 |
61228504 |
Construction of Cerematorium at Simuldari Crematium Ground at Simuldari Sansad |
350000 |
Construction of Cerematorium at Simuldari Crematium Ground at Simuldari Sansad1 |
Completion of work |
-
latitude : 22.042765128426254
Longitude : 87.7218583971262
file name : Image_26042022164124057.png
|
2022-04-26 16:41:24.21122 |
51 |
47130578 |
320 Construction of Concrete road from the house of Sukhendu Bera to the house of Putul Pradhan at M |
350000 |
320 Construction of Concrete road from the house of Sukhendu Bera to the house of Putul Pradhan at M1 |
Roof laid |
-
latitude : 22.01678449753672,22.01678449753672
Longitude : 87.68231710419059,87.68231710419059
file name : Image_10052022100916006.png
|
2022-05-10 10:09:16.144238 |
52 |
47130578 |
320 Construction of Concrete road from the house of Sukhendu Bera to the house of Putul Pradhan at M |
350000 |
320 Construction of Concrete road from the house of Sukhendu Bera to the house of Putul Pradhan at M1 |
Completion of work |
-
latitude : 22.01556493062526,22.015567319467664
Longitude : 87.68239153549075,87.68238659016788
file name : Image_08052022122914811.png
|
2022-05-08 12:29:14.965262 |
53 |
47130578 |
320 Construction of Concrete road from the house of Sukhendu Bera to the house of Putul Pradhan at M |
350000 |
320 Construction of Concrete road from the house of Sukhendu Bera to the house of Putul Pradhan at M1 |
Completion of work |
-
latitude : 22.0167923765257,22.01679095160216
Longitude : 87.6823012623936,87.6822989154607
file name : Image_27042022074704815.png
|
2022-04-27 07:47:04.933555 |
54 |
47089973 |
287 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Balai Adak at Basudevb |
250000 |
287 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Balai Adak at Basudevb1 |
Roof laid |
-
latitude : 22.030743048526347
Longitude : 87.70412245765328
file name : Image_11062022081346197.png
|
2022-06-11 08:13:46.286335 |
55 |
47089973 |
287 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Balai Adak at Basudevb |
250000 |
287 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Balai Adak at Basudevb1 |
Plinth level |
-
latitude : 22.03077456448227
Longitude : 87.70405707880855
file name : Image_24052022120834437.png
|
2022-05-24 12:08:34.521599 |
56 |
47089973 |
287 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Balai Adak at Basudevb |
250000 |
287 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Balai Adak at Basudevb1 |
Completion of work |
-
latitude : 22.030891072936356
Longitude : 87.70412966609001
file name : Image_09042022075748416.png
|
2022-04-09 07:57:48.525833 |
57 |
47090350 |
289 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Madhyam Para at Basude |
250000 |
289 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Madhyam Para at Basude1 |
Roof laid |
-
latitude : 22.022603969089687
Longitude : 87.70326549187303
file name : Image_11062022082213001.png
|
2022-06-11 08:22:13.080751 |
58 |
47090350 |
289 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Madhyam Para at Basude |
250000 |
289 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Madhyam Para at Basude1 |
Plinth level |
-
latitude : 22.022694661282003
Longitude : 87.70332148298621
file name : Image_24052022120825600.png
|
2022-05-24 12:08:25.697082 |
59 |
47090350 |
289 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Madhyam Para at Basude |
250000 |
289 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Madhyam Para at Basude1 |
Completion of work |
-
latitude : 22.02265321277082
Longitude : 87.7032112609595
file name : Image_09042022075725082.png
|
2022-04-09 07:57:25.191533 |
60 |
47089529 |
285 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Yuba Sangha at Manikjo |
250000 |
285 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Yuba Sangha at Manikjo1 |
Roof laid |
-
latitude : 22.02460556756705
Longitude : 87.6914674602449
file name : Image_07062022180518340.png
|
2022-06-07 18:05:18.429882 |
61 |
47089529 |
285 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Yuba Sangha at Manikjo |
250000 |
285 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Yuba Sangha at Manikjo1 |
Plinth level |
-
latitude : 22.024583439342678
Longitude : 87.69145564176142
file name : Image_30052022183318991.png
|
2022-05-30 18:33:19.08825 |
62 |
47089529 |
285 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Yuba Sangha at Manikjo |
250000 |
285 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Yuba Sangha at Manikjo1 |
Completion of work |
-
latitude : 22.024585409089923
Longitude : 87.69145580939949
file name : Image_27042022075931655.png
|
2022-04-27 07:59:31.79944 |
63 |
47090779 |
290 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Sitala Mandir at Uttar |
250000 |
290 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Sitala Mandir at Uttar1 |
Roof laid |
-
latitude : 22.01860420871526
Longitude : 87.68796776421368
file name : Image_17062022082830147.png
|
2022-06-17 08:28:30.243332 |
64 |
47090779 |
290 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Sitala Mandir at Uttar |
250000 |
290 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Sitala Mandir at Uttar1 |
Plinth level |
-
latitude : 22.018639538437128
Longitude : 87.68802291713655
file name : Image_30052022184441395.png
|
2022-05-30 18:44:41.491415 |
65 |
47090779 |
290 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Sitala Mandir at Uttar |
250000 |
290 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Sitala Mandir at Uttar1 |
Completion of work |
-
latitude : 22.018638239242136
Longitude : 87.68810003064573
file name : Image_27042022074658041.png
|
2022-04-27 07:46:58.189491 |
66 |
47087524 |
282 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Tushar Kanti Dey at La |
250000 |
282 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Tushar Kanti Dey at La1 |
Roof laid |
-
latitude : 22.006526263430715
Longitude : 87.67865337431431
file name : Image_14062022133559749.png
|
2022-06-14 13:35:59.862544 |
67 |
47087524 |
282 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Tushar Kanti Dey at La |
250000 |
282 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Tushar Kanti Dey at La1 |
Plinth level |
-
latitude : 22.00646691955626
Longitude : 87.6787006482482
file name : Image_07062022073115873.png
|
2022-06-07 07:31:15.96057 |
68 |
47087524 |
282 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Tushar Kanti Dey at La |
250000 |
282 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Tushar Kanti Dey at La1 |
Completion of work |
-
latitude : 22.006449652835727
Longitude : 87.67875286750495
file name : Image_04062022095643607.png
|
2022-06-04 09:56:43.711076 |
69 |
47084286 |
273 Upgradation of Electrict Submarsible pump to Solar Pump including allied pipe line near Kismat K |
250000 |
273 Upgradation of Electrict Submarsible pump to Solar Pump including allied pipe line near Kismat K1 |
Roof laid |
-
latitude : 22.043058117851615
Longitude : 87.70499258302152
file name : Image_14062022092420387.png
|
2022-06-14 09:24:20.492486 |
70 |
47084286 |
273 Upgradation of Electrict Submarsible pump to Solar Pump including allied pipe line near Kismat K |
250000 |
273 Upgradation of Electrict Submarsible pump to Solar Pump including allied pipe line near Kismat K1 |
Plinth level |
-
latitude : 22.04304743092507
Longitude : 87.7049864642322
file name : Image_14062022082639474.png
|
2022-06-14 08:26:39.570386 |
71 |
47084286 |
273 Upgradation of Electrict Submarsible pump to Solar Pump including allied pipe line near Kismat K |
250000 |
273 Upgradation of Electrict Submarsible pump to Solar Pump including allied pipe line near Kismat K1 |
Completion of work |
-
latitude : 22.042962396517396
Longitude : 87.70513960160315
file name : Image_09052022113828907.png
|
2022-05-09 11:38:29.027403 |
72 |
47089233 |
283 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Srikanta Jana at Udbad |
250000 |
283 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Srikanta Jana at Udbad1 |
Roof laid |
-
latitude : 22.006116472184658
Longitude : 87.70307966507971
file name : Image_14062022134656780.png
|
2022-06-14 13:46:56.951997 |
73 |
47089233 |
283 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Srikanta Jana at Udbad |
250000 |
283 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Srikanta Jana at Udbad1 |
Plinth level |
-
latitude : 22.006062241271138
Longitude : 87.70301369950175
file name : Image_19052022155738588.png
|
2022-05-19 15:57:38.718302 |
74 |
47089233 |
283 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Srikanta Jana at Udbad |
250000 |
283 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Srikanta Jana at Udbad1 |
Completion of work |
-
latitude : 22.006099289283156
Longitude : 87.70305627956986
file name : Image_09042022075609171.png
|
2022-04-09 07:56:09.304502 |
75 |
47089377 |
284 Upgradation of Electrict Submarsible pump to Solar Pump including allied pipe line near Durga Ma |
250000 |
284 Upgradation of Electrict Submarsible pump to Solar Pump including allied pipe line near Durga Ma1 |
Roof laid |
-
latitude : 21.992154316976666
Longitude : 87.69866189919412
file name : Image_18062022130138299.png
|
2022-06-18 13:01:38.399121 |
76 |
47089377 |
284 Upgradation of Electrict Submarsible pump to Solar Pump including allied pipe line near Durga Ma |
250000 |
284 Upgradation of Electrict Submarsible pump to Solar Pump including allied pipe line near Durga Ma1 |
Plinth level |
-
latitude : 21.992130931466818
Longitude : 87.6987525075674
file name : Image_18062022122922573.png
|
2022-06-18 12:29:22.676778 |
77 |
47089377 |
284 Upgradation of Electrict Submarsible pump to Solar Pump including allied pipe line near Durga Ma |
250000 |
284 Upgradation of Electrict Submarsible pump to Solar Pump including allied pipe line near Durga Ma1 |
Completion of work |
-
latitude : 21.992097194306552
Longitude : 87.69862049259245
file name : Image_18062022121134352.png
|
2022-06-18 12:11:34.449068 |
78 |
47128508 |
308 Construction of Concrete road from the house of Ranjan Dolai to the house of Bibhuti Dolai at D. |
350000 |
308 Construction of Concrete road from the house of Ranjan Dolai to the house of Bibhuti Dolai at D.1 |
Roof laid |
-
latitude : 22.006413862109184,22.00641226954758
Longitude : 87.68970114178956,87.68970290198922
file name : Image_17062022081352883.png
|
2022-06-17 08:13:52.98078 |
79 |
47128508 |
308 Construction of Concrete road from the house of Ranjan Dolai to the house of Bibhuti Dolai at D. |
350000 |
308 Construction of Concrete road from the house of Ranjan Dolai to the house of Bibhuti Dolai at D.1 |
Plinth level |
-
latitude : 22.00640460010618,22.00640460010618
Longitude : 87.6897160615772,87.6897160615772
file name : Image_16062022183836974.png
|
2022-06-16 18:38:37.060445 |
80 |
47128508 |
308 Construction of Concrete road from the house of Ranjan Dolai to the house of Bibhuti Dolai at D. |
350000 |
308 Construction of Concrete road from the house of Ranjan Dolai to the house of Bibhuti Dolai at D.1 |
Completion of work |
-
latitude : 22.006219569593668,22.006219569593668
Longitude : 87.6897210907191,87.6897210907191
file name : Image_14052022084342607.png
|
2022-05-14 08:43:42.733239 |
81 |
47129120 |
312 Improvement of Tali pilling from the pond side of Deb Kumar Ghanti at D. Patharberia(W) Sansad. |
120000 |
312 Improvement of Tali pilling from the pond side of Deb Kumar Ghanti at D. Patharberia(W) Sansad.1 |
Roof laid |
-
latitude : 22.01410639565438,22.014104635454714
Longitude : 87.69323956221342,87.69324014894664
file name : Image_01072022095552884.png
|
2022-07-01 09:55:52.994308 |
82 |
47129120 |
312 Improvement of Tali pilling from the pond side of Deb Kumar Ghanti at D. Patharberia(W) Sansad. |
120000 |
312 Improvement of Tali pilling from the pond side of Deb Kumar Ghanti at D. Patharberia(W) Sansad.1 |
Plinth level |
-
latitude : 22.014319505542517,22.014170978218317
Longitude : 87.69264981150627,87.69310595467687
file name : Image_20062022125124155.png
|
2022-06-20 12:51:24.281779 |
83 |
47129120 |
312 Improvement of Tali pilling from the pond side of Deb Kumar Ghanti at D. Patharberia(W) Sansad. |
120000 |
312 Improvement of Tali pilling from the pond side of Deb Kumar Ghanti at D. Patharberia(W) Sansad.1 |
Plinth level |
-
latitude : 22.014213013462722,22.014213013462722
Longitude : 87.69343041814864,87.69343041814864
file name : Image_20062022092139957.png
|
2022-06-20 09:21:40.066805 |
84 |
47129120 |
312 Improvement of Tali pilling from the pond side of Deb Kumar Ghanti at D. Patharberia(W) Sansad. |
120000 |
312 Improvement of Tali pilling from the pond side of Deb Kumar Ghanti at D. Patharberia(W) Sansad.1 |
Completion of work |
-
latitude : 22.01407119166106,22.01415920164436,22.01415920164436,22.01415920164436
Longitude : 87.69315515644848,87.69309028051794,87.69309028051794,87.69309028051794
file name : Image_09042022075635226.png
|
2022-04-09 07:56:35.350535 |
85 |
47128359 |
307 Improvement of Tali pilling from the pond side of Swapan Maity S/o Gajendra at Simuldari Sansad. |
70000 |
307 Improvement of Tali pilling from the pond side of Swapan Maity S/o Gajendra at Simuldari Sansad.1 |
Roof laid |
-
latitude : 22.035906300880015,22.035942594520748
Longitude : 87.71475280635059,87.71479178220034
file name : Image_01072022095603995.png
|
2022-07-01 09:56:04.103866 |
86 |
47128359 |
307 Improvement of Tali pilling from the pond side of Swapan Maity S/o Gajendra at Simuldari Sansad. |
70000 |
307 Improvement of Tali pilling from the pond side of Swapan Maity S/o Gajendra at Simuldari Sansad.1 |
Plinth level |
-
latitude : 22.035922268405557,22.035944815725088
Longitude : 87.71469488739967,87.71471391431987
file name : Image_23062022114456702.png
|
2022-06-23 11:44:56.830341 |
87 |
47128359 |
307 Improvement of Tali pilling from the pond side of Swapan Maity S/o Gajendra at Simuldari Sansad. |
70000 |
307 Improvement of Tali pilling from the pond side of Swapan Maity S/o Gajendra at Simuldari Sansad.1 |
Completion of work |
-
latitude : 22.035927255637944,22.03593467362225
Longitude : 87.71470930427313,87.71474224515259
file name : Image_23062022073305736.png
|
2022-06-23 07:33:05.850697 |
88 |
47090150 |
288 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Ranjit Hazra at Basude |
250000 |
288 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Ranjit Hazra at Basude1 |
Roof laid |
-
latitude : 22.025536
Longitude : 87.6988374
file name : Image_21072022091527164.png
|
2022-07-21 09:15:27.24457 |
89 |
47090150 |
288 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Ranjit Hazra at Basude |
250000 |
288 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Ranjit Hazra at Basude1 |
Plinth level |
-
latitude : 22.0255258
Longitude : 87.6988391
file name : Image_30062022081506096.png
|
2022-06-30 08:15:06.191009 |
90 |
47090150 |
288 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Ranjit Hazra at Basude |
250000 |
288 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Ranjit Hazra at Basude1 |
Completion of work |
-
latitude : 22.0255247
Longitude : 87.6988381
file name : Image_30062022080706884.png
|
2022-06-30 08:07:06.995908 |
91 |
47129838 |
315 Construction of Concrete road from the house of Gourhari Arai to the house of Srikanta Bar at Kh |
350000 |
315 Construction of Concrete road from the house of Gourhari Arai to the house of Srikanta Bar at Kh1 |
Roof laid |
-
latitude : 22.0028915,22.0028915
Longitude : 87.6821365,87.6821365
file name : Image_20072022093938833.png
|
2022-07-20 09:39:38.948517 |
92 |
47129838 |
315 Construction of Concrete road from the house of Gourhari Arai to the house of Srikanta Bar at Kh |
350000 |
315 Construction of Concrete road from the house of Gourhari Arai to the house of Srikanta Bar at Kh1 |
Plinth level |
-
latitude : 22.002117969095707,22.002117969095707
Longitude : 87.68162953667343,87.68162953667343
file name : Image_18072022144010362.png
|
2022-07-18 14:40:10.473262 |
93 |
47129838 |
315 Construction of Concrete road from the house of Gourhari Arai to the house of Srikanta Bar at Kh |
350000 |
315 Construction of Concrete road from the house of Gourhari Arai to the house of Srikanta Bar at Kh1 |
Completion of work |
-
latitude : 22.00206776149571,22.00206776149571,22.002068515866995,22.002070653252304
Longitude : 87.68160564824939,87.68160564824939,87.68160732463002,87.68160548061132
file name : Image_16072022095710438.png
|
2022-07-16 09:57:10.552378 |
94 |
47130713 |
321 Construction of Concrete road from the house of Ramkrishna Jana to the house of Bhanu Khatua at |
350000 |
321 Construction of Concrete road from the house of Ramkrishna Jana to the house of Bhanu Khatua at 1 |
Plinth level |
-
latitude : 22.031019651331007,22.031019651331007
Longitude : 87.69840935245156,87.69840935245156
file name : Image_03082022123517747.png
|
2022-08-03 12:35:17.896484 |
95 |
47130713 |
321 Construction of Concrete road from the house of Ramkrishna Jana to the house of Bhanu Khatua at |
350000 |
321 Construction of Concrete road from the house of Ramkrishna Jana to the house of Bhanu Khatua at 1 |
Completion of work |
-
latitude : 22.030774857848883,22.030774857848883
Longitude : 87.69858470186591,87.69858470186591
file name : Image_03082022122939335.png
|
2022-08-03 12:29:39.442858 |
96 |
47128228 |
306 Construction of Concrete road from the place of Neem tala to the house of Asis Pramanik at Simul |
350000 |
306 Construction of Concrete road from the place of Neem tala to the house of Asis Pramanik at Simul1 |
Roof laid |
-
latitude : 22.040319456718862,22.040322474204004
Longitude : 87.7175085246563,87.7175114583224
file name : Image_21082022174535548.png
|
2022-08-21 17:45:35.647238 |
97 |
47128228 |
306 Construction of Concrete road from the place of Neem tala to the house of Asis Pramanik at Simul |
350000 |
306 Construction of Concrete road from the place of Neem tala to the house of Asis Pramanik at Simul1 |
Plinth level |
-
latitude : 22.0513982,22.0513982,22.040359103120863
Longitude : 87.7195705,87.7195705,87.71706067956984
file name : Image_06082022085930074.png
|
2022-08-06 08:59:30.19065 |
98 |
47128228 |
306 Construction of Concrete road from the place of Neem tala to the house of Asis Pramanik at Simul |
350000 |
306 Construction of Concrete road from the place of Neem tala to the house of Asis Pramanik at Simul1 |
Completion of work |
-
latitude : 22.040346865542233,22.040347955189645
Longitude : 87.71752461791039,87.71751623600721
file name : Image_31072022163932284.png
|
2022-07-31 16:39:32.394147 |
99 |
47086542 |
280 Construction of New Culvert near the house of Srikanta Bar at Saktia Mouza |
157485 |
280 Construction of New Culvert near the house of Srikanta Bar at Saktia Mouza1 |
Roof laid |
-
latitude : 22.0028957,22.0028957
Longitude : 87.6821541,87.6821541
file name : Image_19082022095523604.png
|
2022-08-19 09:55:23.706281 |
100 |
47086542 |
280 Construction of New Culvert near the house of Srikanta Bar at Saktia Mouza |
157485 |
280 Construction of New Culvert near the house of Srikanta Bar at Saktia Mouza1 |
Plinth level |
-
latitude : 22.0028952,22.0028952
Longitude : 87.6821563,87.6821563
file name : Image_12082022093849415.png
|
2022-08-12 09:38:49.508458 |
101 |
47086542 |
280 Construction of New Culvert near the house of Srikanta Bar at Saktia Mouza |
157485 |
280 Construction of New Culvert near the house of Srikanta Bar at Saktia Mouza1 |
Completion of work |
-
latitude : 22.002540794201195,22.002540794201195
Longitude : 87.68234887160361,87.68234887160361
file name : Image_11082022093250310.png
|
2022-08-11 09:32:50.407717 |
102 |
47128126 |
305 Improvement of Tali pilling from the pond side of Ardhendu Maity at Khatial Sansad. |
90000 |
305 Improvement of Tali pilling from the pond side of Ardhendu Maity at Khatial Sansad.1 |
Roof laid |
-
latitude : 22.032884331420064,22.032884415239096
Longitude : 87.7108165808022,87.71081641316414
file name : Image_13082022114753206.png
|
2022-08-13 11:47:53.311248 |
103 |
47128126 |
305 Improvement of Tali pilling from the pond side of Ardhendu Maity at Khatial Sansad. |
90000 |
305 Improvement of Tali pilling from the pond side of Ardhendu Maity at Khatial Sansad.1 |
Plinth level |
-
latitude : 22.032870166003704,22.032870166003704,22.032897449098527,22.032899712212384
Longitude : 87.71093627437949,87.71093627437949,87.7108062710613,87.71080291830003
file name : Image_13082022114145431.png
|
2022-08-13 11:41:45.535597 |
104 |
47128126 |
305 Improvement of Tali pilling from the pond side of Ardhendu Maity at Khatial Sansad. |
90000 |
305 Improvement of Tali pilling from the pond side of Ardhendu Maity at Khatial Sansad.1 |
Completion of work |
-
latitude : 22.03290977049619,22.03290977049619
Longitude : 87.71084834821522,87.71084834821522
file name : Image_13082022112946951.png
|
2022-08-13 11:29:47.051171 |
105 |
47086846 |
281 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Khantmari Mandir at Kh |
250000 |
281 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Khantmari Mandir at Kh1 |
Roof laid |
-
latitude : 22.00017315801233
Longitude : 87.68401360139251
file name : Image_26092022111139158.png
|
2022-09-26 11:11:39.254673 |
106 |
47086846 |
281 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Khantmari Mandir at Kh |
250000 |
281 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Khantmari Mandir at Kh1 |
Plinth level |
-
latitude : 22.000109162181616
Longitude : 87.68401955254376
file name : Image_30082022111649698.png
|
2022-08-30 11:16:49.79219 |
107 |
47086846 |
281 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Khantmari Mandir at Kh |
250000 |
281 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Khantmari Mandir at Kh1 |
Completion of work |
-
latitude : 22.00010182801634
Longitude : 87.68409130163491
file name : Image_29082022094359548.png
|
2022-08-29 09:43:59.668187 |
108 |
47092853 |
298 Installation of New water pipe line near the Basanti Mandir to the house of Sukumar Bhunia at Ma |
100000 |
298 Installation of New water pipe line near the Basanti Mandir to the house of Sukumar Bhunia at Ma1 |
Roof laid |
-
latitude : 22.023005839437246
Longitude : 87.69139680080116
file name : Image_16092022150304943.png
|
2022-09-16 15:03:05.03959 |
109 |
47092853 |
298 Installation of New water pipe line near the Basanti Mandir to the house of Sukumar Bhunia at Ma |
100000 |
298 Installation of New water pipe line near the Basanti Mandir to the house of Sukumar Bhunia at Ma1 |
Plinth level |
-
latitude : 22.02300722245127
Longitude : 87.69140417687595
file name : Image_10092022091124780.png
|
2022-09-10 09:11:24.87865 |
110 |
47092853 |
298 Installation of New water pipe line near the Basanti Mandir to the house of Sukumar Bhunia at Ma |
100000 |
298 Installation of New water pipe line near the Basanti Mandir to the house of Sukumar Bhunia at Ma1 |
Completion of work |
-
latitude : 22.022974994033575
Longitude : 87.69138305447996
file name : Image_25082022135458729.png
|
2022-08-25 13:54:58.851645 |
111 |
47089750 |
286 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Srikanta Pradhan at Ma |
250000 |
286 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Srikanta Pradhan at Ma1 |
Roof laid |
-
latitude : 22.01471659820527
Longitude : 87.68201711587608
file name : Image_27092022115512341.png
|
2022-09-27 11:55:12.456276 |
112 |
47089750 |
286 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Srikanta Pradhan at Ma |
250000 |
286 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Srikanta Pradhan at Ma1 |
Plinth level |
-
latitude : 22.01471739448607
Longitude : 87.68202105537057
file name : Image_06092022115835599.png
|
2022-09-06 11:58:35.738179 |
113 |
47089750 |
286 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Srikanta Pradhan at Ma |
250000 |
286 Upgradation of Electrict Submarsible pump to Solar Pump near the house of Srikanta Pradhan at Ma1 |
Completion of work |
-
latitude : 22.014727578498423
Longitude : 87.68202348612249
file name : Image_25082022135450008.png
|
2022-08-25 13:54:50.122426 |
114 |
47093770 |
301 Upgradation of Electrict Submarsible pump to Solar Pump at Gram Panchayat Office at Udbadal Mouz |
150000 |
301 Upgradation of Electrict Submarsible pump to Solar Pump at Gram Panchayat Office at Udbadal Mouz1 |
Roof laid |
-
latitude : 22.0090751
Longitude : 87.7018748
file name : Image_27092022161900562.png
|
2022-09-27 16:19:00.640643 |
115 |
47093770 |
301 Upgradation of Electrict Submarsible pump to Solar Pump at Gram Panchayat Office at Udbadal Mouz |
150000 |
301 Upgradation of Electrict Submarsible pump to Solar Pump at Gram Panchayat Office at Udbadal Mouz1 |
Plinth level |
-
latitude : 22.0090933
Longitude : 87.7019469
file name : Image_23092022131449832.png
|
2022-09-23 13:14:49.915566 |
116 |
47093770 |
301 Upgradation of Electrict Submarsible pump to Solar Pump at Gram Panchayat Office at Udbadal Mouz |
150000 |
301 Upgradation of Electrict Submarsible pump to Solar Pump at Gram Panchayat Office at Udbadal Mouz1 |
Completion of work |
-
latitude : 22.0090914
Longitude : 87.7019108
file name : Image_23092022131147700.png
|
2022-09-23 13:11:47.77816 |
117 |
47084984 |
277 Upgradation of Electrict Submarsible pump to the house of Tapan Dolai at Dakshin Patharberia(E) |
250000 |
277 Upgradation of Electrict Submarsible pump to the house of Tapan Dolai at Dakshin Patharberia(E) 1 |
Roof laid |
-
latitude : 22.00505553279072
Longitude : 87.69023649394512
file name : Image_26092022160950925.png
|
2022-09-26 16:09:51.021589 |
118 |
47084984 |
277 Upgradation of Electrict Submarsible pump to the house of Tapan Dolai at Dakshin Patharberia(E) |
250000 |
277 Upgradation of Electrict Submarsible pump to the house of Tapan Dolai at Dakshin Patharberia(E) 1 |
Plinth level |
-
latitude : 22.005093418993056
Longitude : 87.69030849449337
file name : Image_26092022122207660.png
|
2022-09-26 12:22:07.75843 |
119 |
47084984 |
277 Upgradation of Electrict Submarsible pump to the house of Tapan Dolai at Dakshin Patharberia(E) |
250000 |
277 Upgradation of Electrict Submarsible pump to the house of Tapan Dolai at Dakshin Patharberia(E) 1 |
Completion of work |
-
latitude : 22.00508721638471
Longitude : 87.69029558636248
file name : Image_06092022120833904.png
|
2022-09-06 12:08:34.002031 |
120 |
47084754 |
276 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Baishnab Para at Simul |
250000 |
276 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Baishnab Para at Simul1 |
Roof laid |
-
latitude : 22.04048994462937
Longitude : 87.71752512082458
file name : Image_26092022161235638.png
|
2022-09-26 16:12:35.733998 |
121 |
47084754 |
276 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Baishnab Para at Simul |
250000 |
276 Upgradation of Electrict Submarsible pump to Solar Pump near the place of Baishnab Para at Simul1 |
Completion of work |
-
latitude : 22.027349174022675
Longitude : 87.70737413316965
file name : Image_21082022174403891.png
|
2022-08-21 17:44:04.000509 |
122 |
47086058 |
279 Upgradation of Electrict Submarsible pump to Solar Pump near the place of ICDS School at Dakshin |
250000 |
279 Upgradation of Electrict Submarsible pump to Solar Pump near the place of ICDS School at Dakshin1 |
Roof laid |
-
latitude : 22.01379630714655
Longitude : 87.69511819817126
file name : Image_30012023113932327.png
|
2023-01-30 11:39:32.425236 |
123 |
47086058 |
279 Upgradation of Electrict Submarsible pump to Solar Pump near the place of ICDS School at Dakshin |
250000 |
279 Upgradation of Electrict Submarsible pump to Solar Pump near the place of ICDS School at Dakshin1 |
Completion of work |
-
latitude : 22.01377183198929
Longitude : 87.6951024401933
file name : Image_19082022113437491.png
|
2022-08-19 11:34:37.592114 |
124 |
47131791 |
325 Maintennance of Computer & Xerox for Gram Panchayat |
100000 |
325 Maintennance of Computer & Xerox for Gram Panchayat1 |
Plinth level |
-
latitude : 22.0091216
Longitude : 87.7019697
file name : Image_03012023160740302.png
|
2023-01-03 16:07:40.410482 |
125 |
47131791 |
325 Maintennance of Computer & Xerox for Gram Panchayat |
100000 |
325 Maintennance of Computer & Xerox for Gram Panchayat1 |
Completion of work |
-
latitude : 22.0091224
Longitude : 87.7019704
file name : Image_03012023144514171.png
|
2023-01-03 14:45:14.290717 |
126 |
47128010 |
304 Improvement of Tali pilling from the pond side of Tapan Maity at Khatial Sansad. |
75000 |
304 Improvement of Tali pilling from the pond side of Tapan Maity at Khatial Sansad.1 |
Roof laid |
-
latitude : 22.0333453,22.0333453
Longitude : 87.7146496,87.7146496
file name : Image_04022023091630487.png
|
2023-02-04 09:16:30.579379 |
127 |
47128010 |
304 Improvement of Tali pilling from the pond side of Tapan Maity at Khatial Sansad. |
75000 |
304 Improvement of Tali pilling from the pond side of Tapan Maity at Khatial Sansad.1 |
Plinth level |
-
latitude : 22.033345,22.033345
Longitude : 87.7146497,87.7146497
file name : Image_04022023091208263.png
|
2023-02-04 09:12:08.347118 |
128 |
47128010 |
304 Improvement of Tali pilling from the pond side of Tapan Maity at Khatial Sansad. |
75000 |
304 Improvement of Tali pilling from the pond side of Tapan Maity at Khatial Sansad.1 |
Completion of work |
-
latitude : 22.0226602,22.0226602,22.0333443
Longitude : 87.7149525,87.7149525,87.71465
file name : Image_04022023085902863.png
|
2023-02-04 08:59:02.987562 |
129 |
47132188 |
328 GP Office Decoration at Udbadal Mouza |
250000 |
328 GP Office Decoration at Udbadal Mouza1 |
Roof laid |
-
latitude : 22.0090664
Longitude : 87.7018324
file name : Image_06022023125704602.png
|
2023-02-06 12:57:04.712947 |
130 |
47132188 |
328 GP Office Decoration at Udbadal Mouza |
250000 |
328 GP Office Decoration at Udbadal Mouza1 |
Plinth level |
-
latitude : 22.0091222
Longitude : 87.7019391
file name : Image_03022023164348279.png
|
2023-02-03 16:43:48.391405 |
131 |
47132188 |
328 GP Office Decoration at Udbadal Mouza |
250000 |
328 GP Office Decoration at Udbadal Mouza1 |
Completion of work |
-
latitude : 22.0091129
Longitude : 87.7019082
file name : Image_03022023153926662.png
|
2023-02-03 15:39:26.775258 |
132 |
47129411 |
314 Improvement of Tali pilling from the pond side of Narayan Barik at D. Patharberia(W) Sansad. |
80000 |
314 Improvement of Tali pilling from the pond side of Narayan Barik at D. Patharberia(W) Sansad.1 |
Roof laid |
-
latitude : 22.014659978449345,22.014659182168543
Longitude : 87.6917552947998,87.69175428897142
file name : Image_05022023101455842.png
|
2023-02-05 10:14:55.934796 |
133 |
47129411 |
314 Improvement of Tali pilling from the pond side of Narayan Barik at D. Patharberia(W) Sansad. |
80000 |
314 Improvement of Tali pilling from the pond side of Narayan Barik at D. Patharberia(W) Sansad.1 |
Plinth level |
-
latitude : 22.014648746699095,22.014648243784904
Longitude : 87.69177440553904,87.69177507609129
file name : Image_05022023101227399.png
|
2023-02-05 10:12:27.486996 |
134 |
47129411 |
314 Improvement of Tali pilling from the pond side of Narayan Barik at D. Patharberia(W) Sansad. |
80000 |
314 Improvement of Tali pilling from the pond side of Narayan Barik at D. Patharberia(W) Sansad.1 |
Completion of work |
-
latitude : 22.014627163298428,22.014627163298428
Longitude : 87.69180784933269,87.69180784933269
file name : Image_30012023113627994.png
|
2023-01-30 11:36:28.091409 |
135 |
58676318 |
Construction of Concrete road from Biswanathpur Culvert to the house of Sudhanshu Giri at D. Patharb |
350000 |
Construction of Concrete road from Biswanathpur Culvert to the house of Sudhanshu Giri at D. Patharb1 |
Roof laid |
-
latitude : 22.0022111,22.0022109
Longitude : 87.6847586,87.6847584
file name : Image_24022023080643263.png
|
2023-02-24 08:06:43.352121 |
136 |
58676318 |
Construction of Concrete road from Biswanathpur Culvert to the house of Sudhanshu Giri at D. Patharb |
350000 |
Construction of Concrete road from Biswanathpur Culvert to the house of Sudhanshu Giri at D. Patharb1 |
Plinth level |
-
latitude : 22.0022875,22.0022875
Longitude : 87.6846747,87.6846747
file name : Image_13022023092629258.png
|
2023-02-13 09:26:29.34358 |
137 |
58676318 |
Construction of Concrete road from Biswanathpur Culvert to the house of Sudhanshu Giri at D. Patharb |
350000 |
Construction of Concrete road from Biswanathpur Culvert to the house of Sudhanshu Giri at D. Patharb1 |
Completion of work |
-
latitude : 22.0021988,22.0021988
Longitude : 87.6847565,87.6847565
file name : Image_13022023082333217.png
|
2023-02-13 08:23:33.30629 |
138 |
47092538 |
297 Installation of Sanitary Napkeen Vending Machine at Gram Panchayat Office at Udbadal Mouza. |
110000 |
297 Installation of Sanitary Napkeen Vending Machine at Gram Panchayat Office at Udbadal Mouza. 1 |
Roof laid |
-
latitude : 22.0091366
Longitude : 87.7019587
file name : Image_23022023122121761.png
|
2023-02-23 12:21:21.854712 |
139 |
47092538 |
297 Installation of Sanitary Napkeen Vending Machine at Gram Panchayat Office at Udbadal Mouza. |
110000 |
297 Installation of Sanitary Napkeen Vending Machine at Gram Panchayat Office at Udbadal Mouza. 1 |
Plinth level |
-
latitude : 22.0091382
Longitude : 87.7018936
file name : Image_21022023154759398.png
|
2023-02-21 15:47:59.487763 |
140 |
47092538 |
297 Installation of Sanitary Napkeen Vending Machine at Gram Panchayat Office at Udbadal Mouza. |
110000 |
297 Installation of Sanitary Napkeen Vending Machine at Gram Panchayat Office at Udbadal Mouza. 1 |
Completion of work |
-
latitude : 22.0091297
Longitude : 87.7019554
file name : Image_21022023154453734.png
|
2023-02-21 15:44:53.818205 |
141 |
66508620 |
Construction of Concrete road from Barbaria Hazra Vidyapith to the house of Mantu Barman at Barbaria |
350000 |
Construction of Concrete road from Barbaria Hazra Vidyapith to the house of Mantu Barman at Barbaria1 |
Plinth level |
-
latitude : 22.0382401579991,22.0382401579991
Longitude : 87.71407764405012,87.71407764405012
file name : Image_23022023171801668.png
|
2023-02-23 17:18:01.751778 |
142 |
66508620 |
Construction of Concrete road from Barbaria Hazra Vidyapith to the house of Mantu Barman at Barbaria |
350000 |
Construction of Concrete road from Barbaria Hazra Vidyapith to the house of Mantu Barman at Barbaria1 |
Completion of work |
-
latitude : 22.03825692180544,22.03825692180544
Longitude : 87.71408510394394,87.71408510394394
file name : Image_11022023171930270.png
|
2023-02-11 17:19:30.368148 |
143 |
66508582 |
Construction of Concrete road from house Niranjan Mandal to the house of Biswanath Paria at Khatial |
350000 |
Construction of Concrete road from house Niranjan Mandal to the house of Biswanath Paria at Khatial1 |
Roof laid |
-
latitude : 22.03106969129294,22.03106969129294,22.03106969129294,22.03106969129294
Longitude : 87.71614914759994,87.71614914759994,87.71614914759994,87.71614914759994
file name : Image_23022023175431193.png
|
2023-02-23 17:54:31.295219 |
144 |
66508582 |
Construction of Concrete road from house Niranjan Mandal to the house of Biswanath Paria at Khatial |
350000 |
Construction of Concrete road from house Niranjan Mandal to the house of Biswanath Paria at Khatial1 |
Plinth level |
-
latitude : 22.031076061539352,22.031076061539352,22.031076229177415,22.031076229177415,22.031076229177415,22.031076229177415
Longitude : 87.71614596247673,87.71614596247673,87.71614621393383,87.71614621393383,87.71614621393383,87.71614621393383
file name : Image_23022023171153015.png
|
2023-02-23 17:11:53.095602 |
145 |
66508582 |
Construction of Concrete road from house Niranjan Mandal to the house of Biswanath Paria at Khatial |
350000 |
Construction of Concrete road from house Niranjan Mandal to the house of Biswanath Paria at Khatial1 |
Completion of work |
-
latitude : 22.031083689071238,22.03108406625688,22.031078073196113,22.031078157015145
Longitude : 87.71615912206471,87.71615509875119,87.7161614689976,87.71616163663566
file name : Image_11022023174939944.png
|
2023-02-11 17:49:40.05904 |
146 |
58453795 |
Installation of Submarsible pump with pipe line near land of Sohan Nanda Bera at Simuldari Sansad |
250000 |
Installation of Submarsible pump with pipe line near land of Sohan Nanda Bera at Simuldari Sansad1 |
Plinth level |
-
latitude : 22.04413758125156
Longitude : 87.71356458775699
file name : Image_23022023172313532.png
|
2023-02-23 17:23:13.624439 |
147 |
58453795 |
Installation of Submarsible pump with pipe line near land of Sohan Nanda Bera at Simuldari Sansad |
250000 |
Installation of Submarsible pump with pipe line near land of Sohan Nanda Bera at Simuldari Sansad1 |
Completion of work |
-
latitude : 22.044168678112328
Longitude : 87.71360021084547
file name : Image_11022023172811920.png
|
2023-02-11 17:28:12.022136 |
148 |
58452971 |
Installation of water pipe line near the house of Astik Dolai to Khantmari Pucca Bridge at Khantmari |
150000 |
Installation of water pipe line near the house of Astik Dolai to Khantmari Pucca Bridge at Khantmari1 |
Roof laid |
-
latitude : 22.0022103,22.0022103
Longitude : 87.6847562,87.6847562
file name : Image_16032023094257230.png
|
2023-03-16 09:42:57.318422 |
149 |
58452971 |
Installation of water pipe line near the house of Astik Dolai to Khantmari Pucca Bridge at Khantmari |
150000 |
Installation of water pipe line near the house of Astik Dolai to Khantmari Pucca Bridge at Khantmari1 |
Plinth level |
-
latitude : 22.0022079,22.0022079
Longitude : 87.6847587,87.6847587
file name : Image_24022023080247151.png
|
2023-02-24 08:02:47.237789 |
150 |
58452971 |
Installation of water pipe line near the house of Astik Dolai to Khantmari Pucca Bridge at Khantmari |
150000 |
Installation of water pipe line near the house of Astik Dolai to Khantmari Pucca Bridge at Khantmari1 |
Completion of work |
-
latitude : 22.00214495882392,22.00214495882392
Longitude : 87.68546584993601,87.68546584993601
file name : Image_13022023154736607.png
|
2023-02-13 15:47:36.701672 |
151 |
58454903 |
Installation of Submersible Pump with pipe line near the house of Santosh Maity at Khantmari Sansad |
250000 |
Installation of Submersible Pump with pipe line near the house of Santosh Maity at Khantmari Sansad1 |
Roof laid |
-
latitude : 22.003750763833523
Longitude : 87.68689705990255
file name : Image_15032023120934485.png
|
2023-03-15 12:09:34.597959 |
152 |
58454903 |
Installation of Submersible Pump with pipe line near the house of Santosh Maity at Khantmari Sansad |
250000 |
Installation of Submersible Pump with pipe line near the house of Santosh Maity at Khantmari Sansad1 |
Plinth level |
-
latitude : 22.003753571771085
Longitude : 87.68689831718802
file name : Image_24022023081202679.png
|
2023-02-24 08:12:02.777794 |
153 |
58454903 |
Installation of Submersible Pump with pipe line near the house of Santosh Maity at Khantmari Sansad |
250000 |
Installation of Submersible Pump with pipe line near the house of Santosh Maity at Khantmari Sansad1 |
Completion of work |
-
latitude : 22.003775951452553
Longitude : 87.68687283620238
file name : Image_13022023154409062.png
|
2023-02-13 15:44:09.178823 |
154 |
58455492 |
Installation of Submersible Pump with pipe line near house of Mustakin Saha Minority Area at Laudigh |
300000 |
Installation of Submersible Pump with pipe line near house of Mustakin Saha Minority Area at Laudigh1 |
Roof laid |
-
latitude : 22.0036923
Longitude : 87.6759782
file name : Image_15032023075711399.png
|
2023-03-15 07:57:11.487583 |
155 |
58455492 |
Installation of Submersible Pump with pipe line near house of Mustakin Saha Minority Area at Laudigh |
300000 |
Installation of Submersible Pump with pipe line near house of Mustakin Saha Minority Area at Laudigh1 |
Plinth level |
-
latitude : 22.00366602279246
Longitude : 87.67599639482796
file name : Image_24022023094605480.png
|
2023-02-24 09:46:05.583397 |
156 |
58455492 |
Installation of Submersible Pump with pipe line near house of Mustakin Saha Minority Area at Laudigh |
300000 |
Installation of Submersible Pump with pipe line near house of Mustakin Saha Minority Area at Laudigh1 |
Completion of work |
-
latitude : 22.003701813519
Longitude : 87.67602916806936
file name : Image_24022023075317196.png
|
2023-02-24 07:53:17.286502 |
157 |
58461764 |
Construction of Community Toilet near Champainagar School More at Champainagar Sansad |
600000 |
Construction of Community Toilet near Champainagar School More at Champainagar Sansad1 |
Plinth level |
-
latitude : 22.0027681
Longitude : 87.7027669
file name : Image_26022023180331773.png
|
2023-02-26 18:03:31.869634 |
158 |
58461764 |
Construction of Community Toilet near Champainagar School More at Champainagar Sansad |
600000 |
Construction of Community Toilet near Champainagar School More at Champainagar Sansad1 |
Completion of work |
-
latitude : 22.0027023
Longitude : 87.7031418
file name : Image_11022023125913947.png
|
2023-02-11 12:59:14.054806 |
159 |
59313121 |
Installation of water pipe line near house of Tapan Kar to Manoranjan Dhara at Basudevberia(h) |
100000 |
Installation of water pipe line near house of Tapan Kar to Manoranjan Dhara at Basudevberia(h)1 |
Roof laid |
-
latitude : 22.01486185658723,22.01486185658723
Longitude : 87.69855670630932,87.69855670630932
file name : Image_02032023125651387.png
|
2023-03-02 12:56:51.49484 |
160 |
59313121 |
Installation of water pipe line near house of Tapan Kar to Manoranjan Dhara at Basudevberia(h) |
100000 |
Installation of water pipe line near house of Tapan Kar to Manoranjan Dhara at Basudevberia(h)1 |
Plinth level |
-
latitude : 22.01483029872179,22.01483029872179
Longitude : 87.69852234050632,87.69852234050632
file name : Image_25022023091218982.png
|
2023-02-25 09:12:19.066513 |
161 |
59313121 |
Installation of water pipe line near house of Tapan Kar to Manoranjan Dhara at Basudevberia(h) |
100000 |
Installation of water pipe line near house of Tapan Kar to Manoranjan Dhara at Basudevberia(h)1 |
Completion of work |
-
latitude : 22.01488909777254,22.01488909777254
Longitude : 87.69854270853102,87.69854270853102
file name : Image_20022023120155577.png
|
2023-02-20 12:01:55.689566 |
162 |
58350790 |
Installation of water pipe line near Maddham Para Submarsible pump to house of Arjun Maishal at Basu |
150000 |
Installation of water pipe line near Maddham Para Submarsible pump to house of Arjun Maishal at Basu1 |
Roof laid |
-
latitude : 22.02268891967833,22.02268891967833
Longitude : 87.70298453047872,87.70298453047872
file name : Image_15032023094033683.png
|
2023-03-15 09:40:33.776832 |
163 |
58350790 |
Installation of water pipe line near Maddham Para Submarsible pump to house of Arjun Maishal at Basu |
150000 |
Installation of water pipe line near Maddham Para Submarsible pump to house of Arjun Maishal at Basu1 |
Plinth level |
-
latitude : 22.022668048739433,22.022668048739433
Longitude : 87.70174518227577,87.70174518227577
file name : Image_25022023094353121.png
|
2023-02-25 09:43:53.227177 |
164 |
58350790 |
Installation of water pipe line near Maddham Para Submarsible pump to house of Arjun Maishal at Basu |
150000 |
Installation of water pipe line near Maddham Para Submarsible pump to house of Arjun Maishal at Basu1 |
Completion of work |
-
latitude : 22.022712933830917,22.02271423302591
Longitude : 87.70179254002869,87.70179631188512
file name : Image_13022023161602669.png
|
2023-02-13 16:16:02.754381 |
165 |
58456804 |
Installation of Submersible Pump with pipe line near the house of Tapan Bar at Champainagar Sansad |
250000 |
Installation of Submersible Pump with pipe line near the house of Tapan Bar at Champainagar Sansad1 |
Roof laid |
-
latitude : 21.99493484571576
Longitude : 87.71073619835079
file name : Image_09032023173457522.png
|
2023-03-09 17:34:57.604295 |
166 |
58456804 |
Installation of Submersible Pump with pipe line near the house of Tapan Bar at Champainagar Sansad |
250000 |
Installation of Submersible Pump with pipe line near the house of Tapan Bar at Champainagar Sansad1 |
Plinth level |
-
latitude : 21.99487101752311
Longitude : 87.71083787083626
file name : Image_25022023084301938.png
|
2023-02-25 08:43:02.024331 |
167 |
58456804 |
Installation of Submersible Pump with pipe line near the house of Tapan Bar at Champainagar Sansad |
250000 |
Installation of Submersible Pump with pipe line near the house of Tapan Bar at Champainagar Sansad1 |
Completion of work |
-
latitude : 21.99491250794381
Longitude : 87.71082756109536
file name : Image_13022023173410293.png
|
2023-02-13 17:34:10.400132 |
168 |
58682129 |
Construction of Concrete road from house of Sajani Maity to house of Dilip Sardar at Champainagar |
350000 |
Construction of Concrete road from house of Sajani Maity to house of Dilip Sardar at Champainagar 1 |
Roof laid |
-
latitude : 22.009565918706357,22.009565918706357
Longitude : 87.69819150678813,87.69819150678813
file name : Image_15032023082838114.png
|
2023-03-15 08:28:38.207194 |
169 |
58682129 |
Construction of Concrete road from house of Sajani Maity to house of Dilip Sardar at Champainagar |
350000 |
Construction of Concrete road from house of Sajani Maity to house of Dilip Sardar at Champainagar 1 |
Plinth level |
-
latitude : 22.0091363042593,22.0091363042593
Longitude : 87.69881956279278,87.69881956279278
file name : Image_10032023115637020.png
|
2023-03-10 11:56:37.112319 |
170 |
58682129 |
Construction of Concrete road from house of Sajani Maity to house of Dilip Sardar at Champainagar |
350000 |
Construction of Concrete road from house of Sajani Maity to house of Dilip Sardar at Champainagar 1 |
Completion of work |
-
latitude : 22.009632512927055,22.009632512927055
Longitude : 87.69818371161819,87.69818371161819
file name : Image_11022023121926571.png
|
2023-02-11 12:19:26.663357 |
171 |
58457276 |
Installation of Submersible Pump near the house of Tapas Mandal at Champainagar Sansad |
250000 |
Installation of Submersible Pump near the house of Tapas Mandal at Champainagar Sansad1 |
Plinth level |
-
latitude : 22.005869457498193
Longitude : 87.70411809906363
file name : Image_15032023080952945.png
|
2023-03-15 08:09:53.023619 |
172 |
58457276 |
Installation of Submersible Pump near the house of Tapas Mandal at Champainagar Sansad |
250000 |
Installation of Submersible Pump near the house of Tapas Mandal at Champainagar Sansad1 |
Completion of work |
-
latitude : 22.005770718678832
Longitude : 87.70409379154444
file name : Image_25022023082701824.png
|
2023-02-25 08:27:01.925453 |
173 |
34404590 |
Construction of Concrete road from house of Gour Pradhan to place of MuslimPara at Khatial |
350000 |
Construction of Concrete road from house of Gour Pradhan to place of MuslimPara at Khatial1 |
Roof laid |
-
latitude : 22.0336697,22.0336697
Longitude : 87.714704,87.714704
file name : Image_01022022134512426.png
|
2022-02-01 13:45:12.570649 |
174 |
34404590 |
Construction of Concrete road from house of Gour Pradhan to place of MuslimPara at Khatial |
350000 |
Construction of Concrete road from house of Gour Pradhan to place of MuslimPara at Khatial1 |
Plinth level |
-
latitude : 22.032956080511212,22.032956080511212
Longitude : 87.71518288180232,87.71518288180232
file name : Image_29012022101931711.png
|
2022-01-29 10:19:31.816172 |
175 |
34404590 |
Construction of Concrete road from house of Gour Pradhan to place of MuslimPara at Khatial |
350000 |
Construction of Concrete road from house of Gour Pradhan to place of MuslimPara at Khatial1 |
Completion of work |
-
latitude : 22.03300406690687,22.032995643094182,22.032990865409374
Longitude : 87.71523107774556,87.71519880741835,87.71519025787711
file name : Image_30112021132423943.png
|
2021-11-30 13:24:24.049334 |
176 |
34460352 |
Construction of Concrete road from house of Aloke Maity to Naren Jana at Basudevberia |
350000 |
Construction of Concrete road from house of Aloke Maity to Naren Jana at Basudevberia1 |
Roof laid |
-
latitude : 22.02982342801988,22.02982342801988
Longitude : 87.69926564767957,87.69926564767957
file name : Image_29112021152609249.png
|
2021-11-29 15:26:09.398485 |
177 |
34460352 |
Construction of Concrete road from house of Aloke Maity to Naren Jana at Basudevberia |
350000 |
Construction of Concrete road from house of Aloke Maity to Naren Jana at Basudevberia1 |
Plinth level |
-
latitude : 22.029787260107696,22.029787260107696
Longitude : 87.69915282726288,87.69915282726288
file name : Image_22112021135906430.png
|
2021-11-22 13:59:06.560667 |
178 |
34460352 |
Construction of Concrete road from house of Aloke Maity to Naren Jana at Basudevberia |
350000 |
Construction of Concrete road from house of Aloke Maity to Naren Jana at Basudevberia1 |
Completion of work |
-
latitude : 22.029706919565797,22.029753858223557
Longitude : 87.699129357934,87.69913706928492
file name : Image_21112021094706965.png
|
2021-11-21 09:47:07.094537 |
179 |
34413507 |
Construction Concrete road from house Astik Dolai to house Gobardhan Barman at Khantmari |
350000 |
Construction Concrete road from house Astik Dolai to house Gobardhan Barman at Khantmari1 |
Roof laid |
-
latitude : 22.002559695392847,22.002559695392847
Longitude : 87.68411166965961,87.68411166965961
file name : Image_15122021165906915.png
|
2021-12-15 16:59:07.036051 |
180 |
34413507 |
Construction Concrete road from house Astik Dolai to house Gobardhan Barman at Khantmari |
350000 |
Construction Concrete road from house Astik Dolai to house Gobardhan Barman at Khantmari1 |
Plinth level |
-
latitude : 22.0021389,22.0021389
Longitude : 87.6847543,87.6847543
file name : Image_15122021135852571.png
|
2021-12-15 13:58:52.679966 |
181 |
34413507 |
Construction Concrete road from house Astik Dolai to house Gobardhan Barman at Khantmari |
350000 |
Construction Concrete road from house Astik Dolai to house Gobardhan Barman at Khantmari1 |
Plinth level |
-
latitude : 22.0021409,22.0021409
Longitude : 87.6847588,87.6847588
file name : Image_03122021113537764.png
|
2021-12-03 11:35:37.882932 |
182 |
34413507 |
Construction Concrete road from house Astik Dolai to house Gobardhan Barman at Khantmari |
350000 |
Construction Concrete road from house Astik Dolai to house Gobardhan Barman at Khantmari1 |
Completion of work |
-
latitude : 22.0023029,22.0031446
Longitude : 87.6846446,87.6838729
file name : Image_01122021095747515.png
|
2021-12-01 09:57:47.62206 |
183 |
34410479 |
Installation New Solar Submarsible Pump with pipe line near Shambhu Jana at D. Patharberia |
585000 |
Installation New Solar Submarsible Pump with pipe line near Shambhu Jana at D. Patharberia1 |
Roof laid |
-
latitude : 22.012490574270487
Longitude : 87.69390810281038
file name : Image_02112021134346565.png
|
2021-11-02 13:43:46.666389 |
184 |
34410479 |
Installation New Solar Submarsible Pump with pipe line near Shambhu Jana at D. Patharberia |
585000 |
Installation New Solar Submarsible Pump with pipe line near Shambhu Jana at D. Patharberia1 |
Plinth level |
-
latitude : 22.012429679743946
Longitude : 87.69393475726247
file name : Image_10092021093026017.png
|
2021-09-10 09:30:26.106986 |
185 |
34410479 |
Installation New Solar Submarsible Pump with pipe line near Shambhu Jana at D. Patharberia |
585000 |
Installation New Solar Submarsible Pump with pipe line near Shambhu Jana at D. Patharberia1 |
Completion of work |
-
latitude : 22.0123983733356
Longitude : 87.69394791685045
file name : Image_20082021145611921.png
|
2021-08-20 14:56:12.034646 |
186 |
34457857 |
Installation of New Solar Submarsible Pump near house of Kshudiram Acharya at Manikjore |
585000 |
Installation of New Solar Submarsible Pump near house of Kshudiram Acharya at Manikjore1 |
Roof laid |
-
latitude : 22.010011794045568
Longitude : 87.6763860695064
file name : Image_06012022154020280.png
|
2022-01-06 15:40:20.410316 |
187 |
34457857 |
Installation of New Solar Submarsible Pump near house of Kshudiram Acharya at Manikjore |
585000 |
Installation of New Solar Submarsible Pump near house of Kshudiram Acharya at Manikjore1 |
Plinth level |
-
latitude : 22.02211140654981
Longitude : 87.67570135183632
file name : Image_10092021080950492.png
|
2021-09-10 08:09:50.579484 |
188 |
34457857 |
Installation of New Solar Submarsible Pump near house of Kshudiram Acharya at Manikjore |
585000 |
Installation of New Solar Submarsible Pump near house of Kshudiram Acharya at Manikjore1 |
Completion of work |
-
latitude : 22.022097911685705
Longitude : 87.6756700873375
file name : Image_06092021084806929.png
|
2021-09-06 08:48:07.036548 |
189 |
34420549 |
Installation of New Solar Submarsible Pump with pipe line near Sankar Barman at Champainar |
585000 |
Installation of New Solar Submarsible Pump with pipe line near Sankar Barman at Champainar1 |
Roof laid |
-
latitude : 22.003168263472617
Longitude : 87.70261572673917
file name : Image_02112021104536583.png
|
2021-11-02 10:45:36.726468 |
190 |
34420549 |
Installation of New Solar Submarsible Pump with pipe line near Sankar Barman at Champainar |
585000 |
Installation of New Solar Submarsible Pump with pipe line near Sankar Barman at Champainar1 |
Plinth level |
-
latitude : 22.00307807419449
Longitude : 87.70280130207539
file name : Image_06082021100527097.png
|
2021-08-06 10:05:27.180296 |
191 |
34420549 |
Installation of New Solar Submarsible Pump with pipe line near Sankar Barman at Champainar |
585000 |
Installation of New Solar Submarsible Pump with pipe line near Sankar Barman at Champainar1 |
Completion of work |
-
latitude : 22.003070111386478
Longitude : 87.7027542795986
file name : Image_28072021171641879.png
|
2021-07-28 17:16:42.022822 |
192 |
34420331 |
Construction Concrete road from pond of Pranab Maity to house Shakti Pattanayak at udbadal |
349418 |
Construction Concrete road from pond of Pranab Maity to house Shakti Pattanayak at udbadal1 |
Roof laid |
-
latitude : 22.0100498,22.0100498
Longitude : 87.7032236,87.7032236
file name : Image_11032021172437218.png
|
2021-03-11 17:24:37.313743 |
193 |
34420331 |
Construction Concrete road from pond of Pranab Maity to house Shakti Pattanayak at udbadal |
349418 |
Construction Concrete road from pond of Pranab Maity to house Shakti Pattanayak at udbadal1 |
Plinth level |
-
latitude : 22.01022968161851,22.01022968161851
Longitude : 87.70293490961194,87.70293490961194
file name : Image_11032021172049342.png
|
2021-03-11 17:20:49.434197 |
194 |
34420331 |
Construction Concrete road from pond of Pranab Maity to house Shakti Pattanayak at udbadal |
349418 |
Construction Concrete road from pond of Pranab Maity to house Shakti Pattanayak at udbadal1 |
Completion of work |
-
latitude : 22.0100498,22.0100498
Longitude : 87.7032224,87.7032224
file name : Image_11032021171615680.png
|
2021-03-11 17:16:15.754252 |
195 |
34419318 |
Installation of New water pipeline near Basanti Mandir to Rauth Para to Binod Barman at Neturia |
50000 |
Installation of New water pipeline near Basanti Mandir to Rauth Para to Binod Barman at Neturia1 |
Roof laid |
-
latitude : 21.99066640343517,21.990691130049527,21.990691130049527
Longitude : 87.69969773478806,87.69957611337304,87.69957611337304
file name : Image_16112021140537453.png
|
2021-11-16 14:05:37.565532 |
196 |
34419318 |
Installation of New water pipeline near Basanti Mandir to Rauth Para to Binod Barman at Neturia |
50000 |
Installation of New water pipeline near Basanti Mandir to Rauth Para to Binod Barman at Neturia1 |
Plinth level |
-
latitude : 21.992171416059136,21.992171416059136,21.992165967822075,21.992165967822075
Longitude : 87.69872769713402,87.69872769713402,87.69871830940247,87.69871830940247
file name : Image_16112021132728366.png
|
2021-11-16 13:27:28.475597 |
197 |
34419318 |
Installation of New water pipeline near Basanti Mandir to Rauth Para to Binod Barman at Neturia |
50000 |
Installation of New water pipeline near Basanti Mandir to Rauth Para to Binod Barman at Neturia1 |
Plinth level |
-
latitude : 21.992120118811727,21.992160477675498,21.992148030549288
Longitude : 87.69872920587659,87.69872610457242,87.69872082397342
file name : Image_16112021132545052.png
|
2021-11-16 13:25:45.156716 |
198 |
34419318 |
Installation of New water pipeline near Basanti Mandir to Rauth Para to Binod Barman at Neturia |
50000 |
Installation of New water pipeline near Basanti Mandir to Rauth Para to Binod Barman at Neturia1 |
Completion of work |
-
latitude : 21.992056416347623,21.992056416347623
Longitude : 87.69872442819178,87.69872442819178
file name : Image_26102021131037178.png
|
2021-10-26 13:10:37.344711 |
199 |
34458981 |
Construction Concrete road from Krishnadas Acharya to house of Harekrishna Maity at Basudevberia |
350000 |
Construction Concrete road from Krishnadas Acharya to house of Harekrishna Maity at Basudevberia1 |
Roof laid |
-
latitude : 22.028965624049306,22.028965624049306
Longitude : 87.69990141503513,87.69990141503513
file name : Image_29112021151921038.png
|
2021-11-29 15:19:21.143777 |
200 |
34458981 |
Construction Concrete road from Krishnadas Acharya to house of Harekrishna Maity at Basudevberia |
350000 |
Construction Concrete road from Krishnadas Acharya to house of Harekrishna Maity at Basudevberia1 |
Plinth level |
-
latitude : 22.028947854414582,22.028947854414582
Longitude : 87.69992128014565,87.69992128014565
file name : Image_29112021114404553.png
|
2021-11-29 11:44:04.664922 |
201 |
34458981 |
Construction Concrete road from Krishnadas Acharya to house of Harekrishna Maity at Basudevberia |
350000 |
Construction Concrete road from Krishnadas Acharya to house of Harekrishna Maity at Basudevberia1 |
Completion of work |
-
latitude : 22.02895757742226,22.02895757742226
Longitude : 87.69989621825516,87.69989621825516
file name : Image_21112021094712326.png
|
2021-11-21 09:47:12.442367 |
202 |
34401568 |
Improvement road by Bats Morrum from place Betal Khatial more to Kadirchak at Kismat Khatial |
35000 |
Improvement road by Bats Morrum from place Betal Khatial more to Kadirchak at Kismat Khatial1 |
Roof laid |
-
latitude : 22.045469926670194,22.045469926670194
Longitude : 87.6963316462934,87.6963316462934
file name : Image_21022022132756910.png
|
2022-02-21 13:27:57.010217 |
203 |
34401568 |
Improvement road by Bats Morrum from place Betal Khatial more to Kadirchak at Kismat Khatial |
35000 |
Improvement road by Bats Morrum from place Betal Khatial more to Kadirchak at Kismat Khatial1 |
Plinth level |
-
latitude : 22.045476464554667,22.045476464554667
Longitude : 87.69655569456518,87.69655569456518
file name : Image_26012022104716386.png
|
2022-01-26 10:47:16.524386 |
204 |
34401568 |
Improvement road by Bats Morrum from place Betal Khatial more to Kadirchak at Kismat Khatial |
35000 |
Improvement road by Bats Morrum from place Betal Khatial more to Kadirchak at Kismat Khatial1 |
Completion of work |
-
latitude : 22.043745014816523,22.04374291934073
Longitude : 87.69505994394422,87.69505231641233
file name : Image_20012022135959414.png
|
2022-01-20 13:59:59.509759 |
205 |
34458303 |
Improvement road by Bats Morrum from Land of Sukhendu Bera to Culvert at Manikjore |
28000 |
Improvement road by Bats Morrum from Land of Sukhendu Bera to Culvert at Manikjore1 |
Roof laid |
-
latitude : 22.01557293534279,22.01557293534279
Longitude : 87.68242581747472,87.68242581747472
file name : Image_21022022142923827.png
|
2022-02-21 14:29:23.936757 |
206 |
34458303 |
Improvement road by Bats Morrum from Land of Sukhendu Bera to Culvert at Manikjore |
28000 |
Improvement road by Bats Morrum from Land of Sukhendu Bera to Culvert at Manikjore1 |
Plinth level |
-
latitude : 22.015588944777846,22.015588944777846
Longitude : 87.68240134231746,87.68240134231746
file name : Image_01022022141559899.png
|
2022-02-01 14:16:00.034648 |
207 |
34458303 |
Improvement road by Bats Morrum from Land of Sukhendu Bera to Culvert at Manikjore |
28000 |
Improvement road by Bats Morrum from Land of Sukhendu Bera to Culvert at Manikjore1 |
Completion of work |
-
latitude : 22.015586639754474,22.015606462955475
Longitude : 87.68233680166304,87.6824059523642
file name : Image_20012022142731356.png
|
2022-01-20 14:27:31.464154 |
208 |
34470124 |
Improvement road by Bats Morrum from pond Ratan Giri to Madhusudan Maity at U Patharberia |
28005 |
Improvement road by Bats Morrum from pond Ratan Giri to Madhusudan Maity at U Patharberia1 |
Roof laid |
-
latitude : 22.018438456580043,22.018438456580043
Longitude : 87.6893259678036,87.6893259678036
file name : Image_21022022142815652.png
|
2022-02-21 14:28:15.751078 |
209 |
34470124 |
Improvement road by Bats Morrum from pond Ratan Giri to Madhusudan Maity at U Patharberia |
28005 |
Improvement road by Bats Morrum from pond Ratan Giri to Madhusudan Maity at U Patharberia1 |
Roof laid |
-
latitude : 22.018324211239815,22.018324211239815
Longitude : 87.68908607773483,87.68908607773483
file name : Image_01022022142227589.png
|
2022-02-01 14:22:27.694234 |
210 |
34470124 |
Improvement road by Bats Morrum from pond Ratan Giri to Madhusudan Maity at U Patharberia |
28005 |
Improvement road by Bats Morrum from pond Ratan Giri to Madhusudan Maity at U Patharberia1 |
Plinth level |
-
latitude : 22.018385818228126,22.018385818228126
Longitude : 87.68910024315119,87.68910024315119
file name : Image_31012022125917846.png
|
2022-01-31 12:59:17.981256 |
211 |
34470124 |
Improvement road by Bats Morrum from pond Ratan Giri to Madhusudan Maity at U Patharberia |
28005 |
Improvement road by Bats Morrum from pond Ratan Giri to Madhusudan Maity at U Patharberia1 |
Completion of work |
-
latitude : 22.018471900373697,22.018451155163348
Longitude : 87.68917090259492,87.6892498601228
file name : Image_20012022144324345.png
|
2022-01-20 14:43:24.469133 |
212 |
34402864 |
Improvement of Tali pilling from the pond of Aloke Khatua at Barbaria |
60000 |
Improvement of Tali pilling from the pond of Aloke Khatua at Barbaria 1 |
Roof laid |
-
latitude : 22.03901493921876,22.03901493921876
Longitude : 87.71411066874862,87.71411066874862
file name : Image_24022022133629372.png
|
2022-02-24 13:36:29.478992 |
213 |
34402864 |
Improvement of Tali pilling from the pond of Aloke Khatua at Barbaria |
60000 |
Improvement of Tali pilling from the pond of Aloke Khatua at Barbaria 1 |
Plinth level |
-
latitude : 22.039000606164336,22.039000606164336
Longitude : 87.71417344920337,87.71417344920337
file name : Image_27012022144215881.png
|
2022-01-27 14:42:16.035294 |
214 |
34402864 |
Improvement of Tali pilling from the pond of Aloke Khatua at Barbaria |
60000 |
Improvement of Tali pilling from the pond of Aloke Khatua at Barbaria 1 |
Completion of work |
-
latitude : 22.039020471274853,22.039012885652483
Longitude : 87.71409641951323,87.7141185477376
file name : Image_20012022131159902.png
|
2022-01-20 13:12:00.011154 |
215 |
34463425 |
Improvement road by Bats Morrum from place of Bakharbari to Harizone PrySchool at Basudevberia |
28000 |
Improvement road by Bats Morrum from place of Bakharbari to Harizone PrySchool at Basudevberia1 |
Roof laid |
-
latitude : 22.018159213475883,22.018159213475883
Longitude : 87.7014775481075,87.7014775481075
file name : Image_21022022145943109.png
|
2022-02-21 14:59:43.222697 |
216 |
34463425 |
Improvement road by Bats Morrum from place of Bakharbari to Harizone PrySchool at Basudevberia |
28000 |
Improvement road by Bats Morrum from place of Bakharbari to Harizone PrySchool at Basudevberia1 |
Plinth level |
-
latitude : 22.018047817982733,22.018080675043166,22.018080675043166,22.018080675043166
Longitude : 87.70143203437328,87.70157360471785,87.70157360471785,87.70157360471785
file name : Image_29012022101941858.png
|
2022-01-29 10:19:41.977097 |
217 |
34463425 |
Improvement road by Bats Morrum from place of Bakharbari to Harizone PrySchool at Basudevberia |
28000 |
Improvement road by Bats Morrum from place of Bakharbari to Harizone PrySchool at Basudevberia1 |
Completion of work |
-
latitude : 22.018087254837155,22.01804501004517
Longitude : 87.70153529942036,87.7015383169055
file name : Image_20012022150221755.png
|
2022-01-20 15:02:21.943649 |
218 |
34405609 |
Improvement road by Bats Morrum from house of Sukumar Mandal to Jagriti Sangha at Khatial |
28000 |
Improvement road by Bats Morrum from house of Sukumar Mandal to Jagriti Sangha at Khatial1 |
Roof laid |
-
latitude : 22.032523741945624,22.032523741945624
Longitude : 87.71036479622126,87.71036479622126
file name : Image_21022022124934344.png
|
2022-02-21 12:49:34.449167 |
219 |
34405609 |
Improvement road by Bats Morrum from house of Sukumar Mandal to Jagriti Sangha at Khatial |
28000 |
Improvement road by Bats Morrum from house of Sukumar Mandal to Jagriti Sangha at Khatial1 |
Plinth level |
-
latitude : 22.03249687794596,22.03249687794596
Longitude : 87.71034476347268,87.71034476347268
file name : Image_29012022101936429.png
|
2022-01-29 10:19:36.542365 |
220 |
34405609 |
Improvement road by Bats Morrum from house of Sukumar Mandal to Jagriti Sangha at Khatial |
28000 |
Improvement road by Bats Morrum from house of Sukumar Mandal to Jagriti Sangha at Khatial1 |
Completion of work |
-
latitude : 22.03247948549688,22.032504715025425
Longitude : 87.71039446815848,87.7103178575635
file name : Image_20012022134103140.png
|
2022-01-20 13:41:03.257987 |
221 |
39097444 |
Construction of new Community Latrine near Manikjore Cremation Ground at Manikjore |
350000 |
Construction of new Community Latrine near Manikjore Cremation Ground at Manikjore1 |
Plinth level |
-
latitude : 22.0217228
Longitude : 87.6796395
file name : Image_06012022154933225.png
|
2022-01-06 15:49:33.33549 |
222 |
39097444 |
Construction of new Community Latrine near Manikjore Cremation Ground at Manikjore |
350000 |
Construction of new Community Latrine near Manikjore Cremation Ground at Manikjore1 |
Completion of work |
-
latitude : 22.0217113
Longitude : 87.6796511
file name : Image_22122021132436979.png
|
2021-12-22 13:24:37.078637 |
223 |
39040692 |
Construction of Rain Water Harvesting at Champainagar S.C. High School at Sansad |
300000 |
Construction of Rain Water Harvesting at Champainagar S.C. High School at Sansad1 |
Roof laid |
-
latitude : 22.002598042599857
Longitude : 87.7034657355398
file name : Image_07022022160402418.png
|
2022-02-07 16:04:02.5162 |
224 |
39040692 |
Construction of Rain Water Harvesting at Champainagar S.C. High School at Sansad |
300000 |
Construction of Rain Water Harvesting at Champainagar S.C. High School at Sansad1 |
Plinth level |
-
latitude : 22.002655249089003
Longitude : 87.70343522541225
file name : Image_31012022113816481.png
|
2022-01-31 11:38:16.602208 |
225 |
39040692 |
Construction of Rain Water Harvesting at Champainagar S.C. High School at Sansad |
300000 |
Construction of Rain Water Harvesting at Champainagar S.C. High School at Sansad1 |
Completion of work |
-
latitude : 22.002631654031575
Longitude : 87.70343732088804
file name : Image_02122021143949651.png
|
2021-12-02 14:39:49.790175 |
226 |
34459663 |
Installation of New water pipe line from ICDS to house of Manoranjan Bera at Basudevberia Basuli |
100000 |
Installation of New water pipe line from ICDS to house of Manoranjan Bera at Basudevberia Basuli1 |
Roof laid |
-
latitude : 22.03308247961104,22.03307812102139
Longitude : 87.70422723144293,87.70422195084393
file name : Image_15122021132211361.png
|
2021-12-15 13:22:11.456402 |
227 |
34459663 |
Installation of New water pipe line from ICDS to house of Manoranjan Bera at Basudevberia Basuli |
100000 |
Installation of New water pipe line from ICDS to house of Manoranjan Bera at Basudevberia Basuli1 |
Plinth level |
-
latitude : 22.033123467117548,22.03312082681805
Longitude : 87.70411265082657,87.7041180152446
file name : Image_30112021125938710.png
|
2021-11-30 12:59:38.810723 |
228 |
34459663 |
Installation of New water pipe line from ICDS to house of Manoranjan Bera at Basudevberia Basuli |
100000 |
Installation of New water pipe line from ICDS to house of Manoranjan Bera at Basudevberia Basuli1 |
Completion of work |
-
latitude : 22.033058675006032,22.033058675006032
Longitude : 87.70418272353709,87.70418272353709
file name : Image_12092021180132575.png
|
2021-09-12 18:01:32.660618 |
229 |
34415430 |
Installation of New Submarsible Pump near the house of Gopal Das at Khantmari |
160000 |
Installation of New Submarsible Pump near the house of Gopal Das at Khantmari 1 |
Roof laid |
-
latitude : 22.00104902498424
Longitude : 87.681681253016
file name : Image_22122021132442296.png
|
2021-12-22 13:24:42.398494 |
230 |
34415430 |
Installation of New Submarsible Pump near the house of Gopal Das at Khantmari |
160000 |
Installation of New Submarsible Pump near the house of Gopal Das at Khantmari 1 |
Completion of work |
-
latitude : 22.001041565090418
Longitude : 87.68171637319028
file name : Image_15122021135753936.png
|
2021-12-15 13:57:54.048069 |
231 |
34415430 |
Installation of New Submarsible Pump near the house of Gopal Das at Khantmari |
160000 |
Installation of New Submarsible Pump near the house of Gopal Das at Khantmari 1 |
Completion of work |
-
latitude : 22.00107077602297
Longitude : 87.68173632211983
file name : Image_03122021124435346.png
|
2021-12-03 12:44:35.458596 |
232 |
34415430 |
Installation of New Submarsible Pump near the house of Gopal Das at Khantmari |
160000 |
Installation of New Submarsible Pump near the house of Gopal Das at Khantmari 1 |
Completion of work |
-
latitude : 22.00107433833182
Longitude : 87.68170933239162
file name : Image_02122021122448547.png
|
2021-12-02 12:24:48.65517 |
233 |
34407852 |
Construction of Concrete road from pond of Madan Das to house of Bhagbat Das at Simuldari |
350000 |
Construction of Concrete road from pond of Madan Das to house of Bhagbat Das at Simuldari1 |
Plinth level |
-
latitude : 22.034990703687072,22.034990703687072
Longitude : 87.71456471644342,87.71456471644342
file name : Image_16122021123556941.png
|
2021-12-16 12:35:57.046646 |
234 |
34407852 |
Construction of Concrete road from pond of Madan Das to house of Bhagbat Das at Simuldari |
350000 |
Construction of Concrete road from pond of Madan Das to house of Bhagbat Das at Simuldari1 |
Completion of work |
-
latitude : 22.034972431138158,22.034972431138158,22.034978340379894,22.03498638700694
Longitude : 87.7145678177476,87.7145678177476,87.71455734036863,87.71454200148582
file name : Image_16122021123215243.png
|
2021-12-16 12:32:15.350962 |
235 |
34407852 |
Construction of Concrete road from pond of Madan Das to house of Bhagbat Das at Simuldari |
350000 |
Construction of Concrete road from pond of Madan Das to house of Bhagbat Das at Simuldari1 |
Completion of work |
-
latitude : 22.03495893627405,22.034958978183568
Longitude : 87.71456102840602,87.71456102840602
file name : Image_15122021132206921.png
|
2021-12-15 13:22:07.047651 |
236 |
34423188 |
Installation of New Submarsible Pump near the house of Satyaranjan Maji at Manikjore H |
160000 |
Installation of New Submarsible Pump near the house of Satyaranjan Maji at Manikjore H1 |
Roof laid |
-
latitude : 22.024130942299962
Longitude : 87.69262089394033
file name : Image_15122021135547609.png
|
2021-12-15 13:55:47.73576 |
237 |
34423188 |
Installation of New Submarsible Pump near the house of Satyaranjan Maji at Manikjore H |
160000 |
Installation of New Submarsible Pump near the house of Satyaranjan Maji at Manikjore H1 |
Plinth level |
-
latitude : 22.02407390344888
Longitude : 87.69263514317572
file name : Image_11092021112238677.png
|
2021-09-11 11:22:38.780061 |
238 |
34423188 |
Installation of New Submarsible Pump near the house of Satyaranjan Maji at Manikjore H |
160000 |
Installation of New Submarsible Pump near the house of Satyaranjan Maji at Manikjore H1 |
Completion of work |
-
latitude : 22.02402818016708
Longitude : 87.69255149178207
file name : Image_06092021090032171.png
|
2021-09-06 09:00:32.318454 |
239 |
58672067 |
Construction of Concrete road from the house of Ratan Giri to the house of Debendra Maity at U. Path |
350000 |
Construction of Concrete road from the house of Ratan Giri to the house of Debendra Maity at U. Path1 |
Roof laid |
-
latitude : 22.01834378298372,22.01834378298372
Longitude : 87.68903478048742,87.68903478048742
file name : Image_19052023162257661.png
|
2023-05-19 16:22:57.756943 |
240 |
58672067 |
Construction of Concrete road from the house of Ratan Giri to the house of Debendra Maity at U. Path |
350000 |
Construction of Concrete road from the house of Ratan Giri to the house of Debendra Maity at U. Path1 |
Plinth level |
-
latitude : 22.018361133523285,22.018361133523285
Longitude : 87.6890889275819,87.6890889275819
file name : Image_19052023161848256.png
|
2023-05-19 16:18:48.353306 |
241 |
58672067 |
Construction of Concrete road from the house of Ratan Giri to the house of Debendra Maity at U. Path |
350000 |
Construction of Concrete road from the house of Ratan Giri to the house of Debendra Maity at U. Path1 |
Completion of work |
-
latitude : 22.01840895228088,22.01840895228088
Longitude : 87.68909655511379,87.68909655511379
file name : Image_19052023161540156.png
|
2023-05-19 16:15:40.2611 |
242 |
58683378 |
Construction of Concrete road from the house of jiban krishna to house of Aswini Das at D. Patharbe |
230000 |
Construction of Concrete road from the house of jiban krishna to house of Aswini Das at D. Patharbe1 |
Roof laid |
-
latitude : 22.01341669075191,22.013420378789306
Longitude : 87.69748969003558,87.69749220460653
file name : Image_19052023153607006.png
|
2023-05-19 15:36:07.111139 |
243 |
58683378 |
Construction of Concrete road from the house of jiban krishna to house of Aswini Das at D. Patharbe |
230000 |
Construction of Concrete road from the house of jiban krishna to house of Aswini Das at D. Patharbe1 |
Plinth level |
-
latitude : 22.01337712816894,22.01337712816894
Longitude : 87.69745205529034,87.69745205529034
file name : Image_19052023153354777.png
|
2023-05-19 15:33:54.884406 |
244 |
58683378 |
Construction of Concrete road from the house of jiban krishna to house of Aswini Das at D. Patharbe |
230000 |
Construction of Concrete road from the house of jiban krishna to house of Aswini Das at D. Patharbe1 |
Completion of work |
-
latitude : 22.013377379626036,22.0133394934237
Longitude : 87.6974733453244,87.69751626066864
file name : Image_19052023152926190.png
|
2023-05-19 15:29:26.290836 |
245 |
58531442 |
Construction of Concrete road from the house of Tapan Barman to Sachin Barman at Kismat Khatial Sans |
350000 |
Construction of Concrete road from the house of Tapan Barman to Sachin Barman at Kismat Khatial Sans1 |
Roof laid |
-
latitude : 22.044897358864546,22.044897358864546
Longitude : 87.6951780449599,87.6951780449599
file name : Image_30052023120407910.png
|
2023-05-30 12:04:08.005205 |
246 |
58531442 |
Construction of Concrete road from the house of Tapan Barman to Sachin Barman at Kismat Khatial Sans |
350000 |
Construction of Concrete road from the house of Tapan Barman to Sachin Barman at Kismat Khatial Sans1 |
Plinth level |
-
latitude : 22.044957079924643,22.044945135712624
Longitude : 87.69520411267877,87.69520226866007
file name : Image_30052023114917132.png
|
2023-05-30 11:49:17.255998 |
247 |
58531442 |
Construction of Concrete road from the house of Tapan Barman to Sachin Barman at Kismat Khatial Sans |
350000 |
Construction of Concrete road from the house of Tapan Barman to Sachin Barman at Kismat Khatial Sans1 |
Completion of work |
-
latitude : 22.044851216487586,22.044851216487586
Longitude : 87.69515407271683,87.69515407271683
file name : Image_30052023113655810.png
|
2023-05-30 11:36:55.927115 |
248 |
58531442 |
Construction of Concrete road from the house of Tapan Barman to Sachin Barman at Kismat Khatial Sans |
350000 |
Construction of Concrete road from the house of Tapan Barman to Sachin Barman at Kismat Khatial Sans1 |
Completion of work |
-
latitude : 22.044900711625814,22.044894341379404
Longitude : 87.69514443352818,87.69514770247042
file name : Image_30052023113359564.png
|
2023-05-30 11:33:59.684555 |
249 |
58531442 |
Construction of Concrete road from the house of Tapan Barman to Sachin Barman at Kismat Khatial Sans |
350000 |
Construction of Concrete road from the house of Tapan Barman to Sachin Barman at Kismat Khatial Sans1 |
Completion of work |
-
latitude : 22.044753273949027,22.04475436359644
Longitude : 87.69515440799296,87.69515533000231
file name : Image_30052023111743143.png
|
2023-05-30 11:17:43.292743 |
250 |
58679198 |
Construction of Concrete road from the house of Gobinda Das to the house of Nanigopal Bhunia at Khan |
350000 |
Construction of Concrete road from the house of Gobinda Das to the house of Nanigopal Bhunia at Khan1 |
Roof laid |
-
latitude : 22.003922467119992,22.003922467119992
Longitude : 87.6981689594686,87.6981689594686
file name : Image_26052023135149070.png
|
2023-05-26 13:51:49.162617 |
251 |
58679198 |
Construction of Concrete road from the house of Gobinda Das to the house of Nanigopal Bhunia at Khan |
350000 |
Construction of Concrete road from the house of Gobinda Das to the house of Nanigopal Bhunia at Khan1 |
Plinth level |
-
latitude : 22.004019571468234,22.004019571468234
Longitude : 87.69748432561755,87.69748432561755
file name : Image_22052023141834120.png
|
2023-05-22 14:18:34.213382 |
252 |
58679198 |
Construction of Concrete road from the house of Gobinda Das to the house of Nanigopal Bhunia at Khan |
350000 |
Construction of Concrete road from the house of Gobinda Das to the house of Nanigopal Bhunia at Khan1 |
Completion of work |
-
latitude : 22.004010728560388,22.004010728560388
Longitude : 87.69817591644824,87.69817591644824
file name : Image_22052023141239616.png
|
2023-05-22 14:12:39.705067 |
253 |
58761871 |
Installation of water Pipe line near ICDS Centre to the house of Kamalendu Jana at Basudevberia(H) S |
150000 |
Installation of water Pipe line near ICDS Centre to the house of Kamalendu Jana at Basudevberia(H) S1 |
Roof laid |
-
latitude : 22.014233758673072,22.014233758673072
Longitude : 87.69773628562689,87.69773628562689
file name : Image_13062023102156649.png
|
2023-06-13 10:21:56.75153 |
254 |
58761871 |
Installation of water Pipe line near ICDS Centre to the house of Kamalendu Jana at Basudevberia(H) S |
150000 |
Installation of water Pipe line near ICDS Centre to the house of Kamalendu Jana at Basudevberia(H) S1 |
Plinth level |
-
latitude : 22.0144329,22.0144329
Longitude : 87.6979193,87.6979193
file name : Image_22052023144053497.png
|
2023-05-22 14:40:53.598733 |
255 |
58761871 |
Installation of water Pipe line near ICDS Centre to the house of Kamalendu Jana at Basudevberia(H) S |
150000 |
Installation of water Pipe line near ICDS Centre to the house of Kamalendu Jana at Basudevberia(H) S1 |
Completion of work |
-
latitude : 22.014130828902125,22.014130828902125
Longitude : 87.6979707274586,87.6979707274586
file name : Image_19052023154022005.png
|
2023-05-19 15:40:22.101675 |
256 |
58675299 |
Improvement of road by Tali Pilling from the house of Tapan Dolai to the house of Ghanashyam Dolai a |
75000 |
Improvement of road by Tali Pilling from the house of Tapan Dolai to the house of Ghanashyam Dolai a1 |
Roof laid |
-
latitude : 22.022507870569825,22.022472582757473
Longitude : 87.68700619228184,87.6870237942785
file name : Image_30052023122748263.png
|
2023-05-30 12:27:48.360288 |
257 |
58675299 |
Improvement of road by Tali Pilling from the house of Tapan Dolai to the house of Ghanashyam Dolai a |
75000 |
Improvement of road by Tali Pilling from the house of Tapan Dolai to the house of Ghanashyam Dolai a1 |
Roof laid |
-
latitude : 22.02244450338185,22.02244450338185
Longitude : 87.6869307551533,87.6869307551533
file name : Image_30052023122830031.png
|
2023-05-30 12:28:30.123076 |
258 |
58675299 |
Improvement of road by Tali Pilling from the house of Tapan Dolai to the house of Ghanashyam Dolai a |
75000 |
Improvement of road by Tali Pilling from the house of Tapan Dolai to the house of Ghanashyam Dolai a1 |
Plinth level |
-
latitude : 22.022496345452964,22.022496345452964
Longitude : 87.68705061636865,87.68705061636865
file name : Image_29052023114739872.png
|
2023-05-29 11:47:39.988027 |
259 |
58675299 |
Improvement of road by Tali Pilling from the house of Tapan Dolai to the house of Ghanashyam Dolai a |
75000 |
Improvement of road by Tali Pilling from the house of Tapan Dolai to the house of Ghanashyam Dolai a1 |
Completion of work |
-
latitude : 22.022508080117404,22.022508080117404
Longitude : 87.687022453174,87.687022453174
file name : Image_20052023072818076.png
|
2023-05-20 07:28:18.165072 |
260 |
69835983 |
Creation of a new source of drinking water |
250000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.02797811012715
Longitude : 87.68852013163269
file name : Image_08062023172850053.png
|
2023-06-08 17:28:50.149223 |
261 |
69835983 |
Creation of a new source of drinking water |
250000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.02796943485737
Longitude : 87.68845492042601
file name : Image_08062023172552601.png
|
2023-06-08 17:25:52.713333 |
262 |
69835983 |
Creation of a new source of drinking water |
250000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.027964112348855
Longitude : 87.68851233646274
file name : Image_08062023172300745.png
|
2023-06-08 17:23:00.840765 |
263 |
69837044 |
Creation of a new source of drinking water |
250000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.016714927740395
Longitude : 87.70455068908632
file name : Image_28062023151121261.png
|
2023-06-28 15:11:21.238539 |
264 |
69837044 |
Creation of a new source of drinking water |
250000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.016738774254918
Longitude : 87.7044446580112
file name : Image_08062023174333471.png
|
2023-06-08 17:43:33.565845 |
265 |
58452336 |
Installation of water pipe line near the house of Prabhat Bag to Sani Mandir at Khantmari Sansad |
150000 |
Installation of water pipe line near the house of Prabhat Bag to Sani Mandir at Khantmari Sansad1 |
Roof laid |
-
latitude : 22.00278822798282,22.00278822798282
Longitude : 87.69146829843521,87.69146829843521
file name : Image_12062023080801272.png
|
2023-06-12 08:08:01.361463 |
266 |
58452336 |
Installation of water pipe line near the house of Prabhat Bag to Sani Mandir at Khantmari Sansad |
150000 |
Installation of water pipe line near the house of Prabhat Bag to Sani Mandir at Khantmari Sansad1 |
Plinth level |
-
latitude : 22.002749210223556,22.002749210223556
Longitude : 87.69146787934005,87.69146787934005
file name : Image_12062023073752312.png
|
2023-06-12 07:37:52.408274 |
267 |
58452336 |
Installation of water pipe line near the house of Prabhat Bag to Sani Mandir at Khantmari Sansad |
150000 |
Installation of water pipe line near the house of Prabhat Bag to Sani Mandir at Khantmari Sansad1 |
Plinth level |
-
latitude : 22.00276635121554,22.002771086990833
Longitude : 87.69147274084389,87.69147994928062
file name : Image_12062023080337722.png
|
2023-06-12 08:03:37.810921 |
268 |
66830116 |
Construction of roads |
50000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.005086420103908,22.005086420103908
Longitude : 87.68007921986282,87.68007921986282
file name : Image_09042024151405383.png
|
2024-04-09 15:14:05.473366 |
269 |
66830116 |
Construction of roads |
50000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.00509551446885,22.00509551446885
Longitude : 87.68010470084846,87.68010470084846
file name : Image_09042024151204738.png
|
2024-04-09 15:12:04.832606 |
270 |
66830116 |
Construction of roads |
50000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.005158714018762,22.005108674056828
Longitude : 87.68010620959103,87.68014845438302
file name : Image_09042024150742736.png
|
2024-04-09 15:07:42.832573 |
271 |
58457804 |
Installation of Solar Submersible Pump near Gram Panchayat at Champainagar Sansad |
620000 |
Installation of Solar Submersible Pump near Gram Panchayat at Champainagar Sansad1 |
Plinth level |
-
latitude : 22.0090385
Longitude : 87.701973
file name : Image_26072023114424650.png
|
2023-07-26 11:44:24.758063 |
272 |
58457804 |
Installation of Solar Submersible Pump near Gram Panchayat at Champainagar Sansad |
620000 |
Installation of Solar Submersible Pump near Gram Panchayat at Champainagar Sansad1 |
Completion of work |
-
latitude : 22.0090461
Longitude : 87.7019688
file name : Image_26072023113817164.png
|
2023-07-26 11:38:17.324074 |
273 |
58457804 |
Installation of Solar Submersible Pump near Gram Panchayat at Champainagar Sansad |
620000 |
Installation of Solar Submersible Pump near Gram Panchayat at Champainagar Sansad1 |
Completion of work |
-
latitude : 22.0091114
Longitude : 87.7019073
file name : Image_08062023170735342.png
|
2023-06-08 17:07:35.436899 |
274 |
58459417 |
Repairing of Submersible Pump of GP Area |
200980 |
Repairing of Submersible Pump of GP Area1 |
Completion of work |
-
latitude : 22.0090207
Longitude : 87.7019771
file name : Image_04082023133706897.png
|
2023-08-04 13:37:07.034116 |
275 |
58526636 |
Upgradation of toilet of Karmatirtha at Dakshin Patharberia(W) Sansad |
50500 |
Upgradation of toilet of Karmatirtha at Dakshin Patharberia(W) Sansad1 |
Roof laid |
-
latitude : 22.011383618228137
Longitude : 87.69912734627724
file name : Image_14082023133209645.png
|
2023-08-14 13:32:09.745103 |
276 |
58526636 |
Upgradation of toilet of Karmatirtha at Dakshin Patharberia(W) Sansad |
50500 |
Upgradation of toilet of Karmatirtha at Dakshin Patharberia(W) Sansad1 |
Plinth level |
-
latitude : 22.011363208293915
Longitude : 87.6992083992809
file name : Image_14082023132649174.png
|
2023-08-14 13:26:49.276367 |
277 |
58526636 |
Upgradation of toilet of Karmatirtha at Dakshin Patharberia(W) Sansad |
50500 |
Upgradation of toilet of Karmatirtha at Dakshin Patharberia(W) Sansad1 |
Completion of work |
-
latitude : 22.011126042343676
Longitude : 87.69922658801079
file name : Image_14082023132318669.png
|
2023-08-14 13:23:18.766735 |
278 |
58511844 |
Upgradation of Community Toilet of Champainagar SC High School at Champainagar Sansad |
322980 |
Upgradation of Community Toilet of Champainagar SC High School at Champainagar Sansad1 |
Roof laid |
-
latitude : 22.00234164018184
Longitude : 87.7031700219959
file name : Image_23082023143845166.png
|
2023-08-23 14:38:45.262969 |
279 |
58511844 |
Upgradation of Community Toilet of Champainagar SC High School at Champainagar Sansad |
322980 |
Upgradation of Community Toilet of Champainagar SC High School at Champainagar Sansad1 |
Plinth level |
-
latitude : 22.002741
Longitude : 87.7031714
file name : Image_23082023131348517.png
|
2023-08-23 13:13:48.622541 |
280 |
58511844 |
Upgradation of Community Toilet of Champainagar SC High School at Champainagar Sansad |
322980 |
Upgradation of Community Toilet of Champainagar SC High School at Champainagar Sansad1 |
Completion of work |
-
latitude : 22.0027413
Longitude : 87.7031729
file name : Image_23082023131107772.png
|
2023-08-23 13:11:07.843373 |
281 |
58511241 |
Upgradation of Community Toilet of Barbaria Play Ground at Barbaria Sansad |
90000 |
Upgradation of Community Toilet of Barbaria Play Ground at Barbaria Sansad1 |
Roof laid |
-
latitude : 22.03626391477883
Longitude : 87.71451987326145
file name : Image_24082023084916612.png
|
2023-08-24 08:49:16.751531 |
282 |
58511241 |
Upgradation of Community Toilet of Barbaria Play Ground at Barbaria Sansad |
90000 |
Upgradation of Community Toilet of Barbaria Play Ground at Barbaria Sansad1 |
Plinth level |
-
latitude : 22.03628394752741
Longitude : 87.71452599205077
file name : Image_24082023084630470.png
|
2023-08-24 08:46:30.624125 |
283 |
58511241 |
Upgradation of Community Toilet of Barbaria Play Ground at Barbaria Sansad |
90000 |
Upgradation of Community Toilet of Barbaria Play Ground at Barbaria Sansad1 |
Completion of work |
-
latitude : 22.03623889479786
Longitude : 87.71444644778967
file name : Image_24082023084053934.png
|
2023-08-24 08:40:54.048987 |
284 |
58510909 |
Upgradation of Community Toilet near Gram Panchayat at Champainagar Sansad |
70500 |
Upgradation of Community Toilet near Gram Panchayat at Champainagar Sansad1 |
Roof laid |
-
latitude : 22.009071
Longitude : 87.7019492
file name : Image_29082023135838020.png
|
2023-08-29 13:58:38.136051 |
285 |
58510909 |
Upgradation of Community Toilet near Gram Panchayat at Champainagar Sansad |
70500 |
Upgradation of Community Toilet near Gram Panchayat at Champainagar Sansad1 |
Plinth level |
-
latitude : 22.0090571
Longitude : 87.7019604
file name : Image_29082023135626663.png
|
2023-08-29 13:56:26.766248 |
286 |
58510909 |
Upgradation of Community Toilet near Gram Panchayat at Champainagar Sansad |
70500 |
Upgradation of Community Toilet near Gram Panchayat at Champainagar Sansad1 |
Completion of work |
-
latitude : 22.0090525
Longitude : 87.7019707
file name : Image_29082023134802847.png
|
2023-08-29 13:48:02.941146 |
287 |
66813827 |
Water Supply to villages |
90000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.01455168426037
Longitude : 87.69594582729042
file name : Image_09112023125435689.png
|
2023-11-09 12:54:35.898346 |
288 |
66813827 |
Water Supply to villages |
90000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.014546529389918
Longitude : 87.69597575068474
file name : Image_09112023125041706.png
|
2023-11-09 12:50:41.847882 |
289 |
66813827 |
Water Supply to villages |
90000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.014540075324476
Longitude : 87.69595404155552
file name : Image_09112023124711321.png
|
2023-11-09 12:47:11.444265 |
290 |
66813987 |
Water Supply to villages |
185000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.036863
Longitude : 87.7174961
file name : Image_29112023110244933.png
|
2023-11-29 11:02:45.021608 |
291 |
66813987 |
Water Supply to villages |
185000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.0368795
Longitude : 87.7174213
file name : Image_29112023085617716.png
|
2023-11-29 08:56:17.794562 |
292 |
66813987 |
Water Supply to villages |
185000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.03700185753405
Longitude : 87.71725254133344
file name : Image_25112023151546146.png
|
2023-11-25 15:15:46.234657 |
293 |
67576854 |
Drinking water facilities |
234899 |
Drinking water facilities1 |
Roof laid |
-
latitude : 22.0323955
Longitude : 87.7151092
file name : Image_12042024111025437.png
|
2024-04-12 11:10:25.535783 |
294 |
67576854 |
Drinking water facilities |
234899 |
Drinking water facilities1 |
Plinth level |
-
latitude : 22.0323952
Longitude : 87.7151082
file name : Image_12042024110808424.png
|
2024-04-12 11:08:08.684222 |
295 |
67576854 |
Drinking water facilities |
234899 |
Drinking water facilities1 |
Completion of work |
-
latitude : 22.0323969
Longitude : 87.7151116
file name : Image_12042024110358390.png
|
2024-04-12 11:03:58.484691 |
296 |
66829927 |
Construction of roads |
249588 |
Construction of roads1 |
Roof laid |
-
latitude : 22.000013063661754,22.000013776123524
Longitude : 87.68186087720096,87.68187638372183
file name : Image_02032024120622281.png
|
2024-03-02 12:06:22.36747 |
297 |
66829927 |
Construction of roads |
249588 |
Construction of roads1 |
Plinth level |
-
latitude : 22.000016081146896,22.000016081146896
Longitude : 87.68190940842032,87.68190940842032
file name : Image_02032024120445234.png
|
2024-03-02 12:04:45.335828 |
298 |
66829927 |
Construction of roads |
249588 |
Construction of roads1 |
Completion of work |
-
latitude : 21.999989971518517,21.99998812749982
Longitude : 87.681879485026,87.68182005733252
file name : Image_02032024120138185.png
|
2024-03-02 12:01:38.278983 |
299 |
66816809 |
Grey water treatment plant |
350000 |
Grey water treatment plant1 |
Roof laid |
-
latitude : 22.033955748192966
Longitude : 87.690608818084
file name : Image_01122023114640851.png
|
2023-12-01 11:46:41.086772 |
300 |
66816809 |
Grey water treatment plant |
350000 |
Grey water treatment plant1 |
Plinth level |
-
latitude : 22.033877545036376
Longitude : 87.69063664600253
file name : Image_28112023123332258.png
|
2023-11-28 12:33:32.358148 |
301 |
66816809 |
Grey water treatment plant |
350000 |
Grey water treatment plant1 |
Completion of work |
-
latitude : 22.0340248150751
Longitude : 87.69055416807532
file name : Image_28112023123128797.png
|
2023-11-28 12:31:28.900309 |
302 |
67515952 |
Drinking water facilities |
185000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 22.042284216731787
Longitude : 87.71008098497987
file name : Image_11122023125508320.png
|
2023-12-11 12:55:08.419096 |
303 |
67515952 |
Drinking water facilities |
185000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 22.042213808745146
Longitude : 87.71010026335716
file name : Image_28112023121953926.png
|
2023-11-28 12:19:54.032872 |
304 |
67515952 |
Drinking water facilities |
185000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 22.04218342434615
Longitude : 87.7100776322186
file name : Image_28112023120742710.png
|
2023-11-28 12:07:42.793939 |
305 |
67516476 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.0344841433689,22.0344841433689
Longitude : 87.70746784284711,87.70746784284711
file name : Image_28112023115748242.png
|
2023-11-28 11:57:48.326146 |
306 |
67516476 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.034555892460048,22.034555892460048
Longitude : 87.70747773349285,87.70747773349285
file name : Image_28112023115331072.png
|
2023-11-28 11:53:31.160468 |
307 |
67516476 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.034551869146526,22.034551869146526
Longitude : 87.70748200826347,87.70748200826347
file name : Image_28112023115337566.png
|
2023-11-28 11:53:37.668506 |
308 |
67516476 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.03457487747073,22.03457487747073
Longitude : 87.70752073265612,87.70752064883709
file name : Image_24112023140704733.png
|
2023-11-24 14:07:04.832847 |
309 |
66813393 |
Pipe water to residential schools |
60000 |
Pipe water to residential schools1 |
Roof laid |
-
latitude : 22.033170447684824
Longitude : 87.70676921121776
file name : Image_28112023124544468.png
|
2023-11-28 12:45:44.562644 |
310 |
66813393 |
Pipe water to residential schools |
60000 |
Pipe water to residential schools1 |
Plinth level |
-
latitude : 22.03345367219299
Longitude : 87.70672470331192
file name : Image_28112023113810468.png
|
2023-11-28 11:38:10.561602 |
311 |
66813393 |
Pipe water to residential schools |
60000 |
Pipe water to residential schools1 |
Completion of work |
-
latitude : 22.033459371887147
Longitude : 87.7067468315363
file name : Image_24112023140054497.png
|
2023-11-24 14:00:54.59704 |
312 |
66816630 |
Drainage line for grey water |
250000 |
Drainage line for grey water1 |
Roof laid |
-
latitude : 22.0387106
Longitude : 87.7173837
file name : Image_20122023091733182.png
|
2023-12-20 09:17:33.28017 |
313 |
66816630 |
Drainage line for grey water |
250000 |
Drainage line for grey water1 |
Plinth level |
-
latitude : 22.0387118
Longitude : 87.7173904
file name : Image_29112023090031952.png
|
2023-11-29 09:00:32.033438 |
314 |
66816630 |
Drainage line for grey water |
250000 |
Drainage line for grey water1 |
Completion of work |
-
latitude : 22.0387089
Longitude : 87.7173849
file name : Image_25112023151908369.png
|
2023-11-25 15:19:08.464617 |
315 |
66828653 |
Construction of roads |
349900 |
Construction of roads1 |
Roof laid |
-
latitude : 22.03711891081184,22.037110906094313
Longitude : 87.70742232911289,87.7074144501239
file name : Image_03042024113644333.png
|
2024-04-03 11:36:44.425937 |
316 |
66828653 |
Construction of roads |
349900 |
Construction of roads1 |
Plinth level |
-
latitude : 22.037097034044564,22.037097034044564
Longitude : 87.70743833854795,87.70743833854795
file name : Image_03042024113423789.png
|
2024-04-03 11:34:23.881958 |
317 |
66828653 |
Construction of roads |
349900 |
Construction of roads1 |
Completion of work |
-
latitude : 22.03712104819715,22.037077294662595
Longitude : 87.70741696469486,87.70743976347148
file name : Image_03042024112947764.png
|
2024-04-03 11:29:47.8613 |
318 |
68835117 |
Drainage Construction |
350000 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.0091076
Longitude : 87.7019138
file name : Image_02012024160006457.png
|
2024-01-02 16:00:06.540667 |
319 |
68835117 |
Drainage Construction |
350000 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.0091348
Longitude : 87.701905
file name : Image_02012024155711795.png
|
2024-01-02 15:57:11.875225 |
320 |
68835117 |
Drainage Construction |
350000 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.0090693
Longitude : 87.7019664
file name : Image_19122023130648157.png
|
2023-12-19 13:06:48.260691 |
321 |
67516540 |
Construction of roads |
349900 |
Construction of roads1 |
Roof laid |
-
latitude : 22.02771223615855,22.02771223615855
Longitude : 87.70302434451878,87.70302434451878
file name : Image_11032024144556139.png
|
2024-03-11 14:45:56.244262 |
322 |
67516540 |
Construction of roads |
349900 |
Construction of roads1 |
Plinth level |
-
latitude : 22.02769928611815,22.02769928611815
Longitude : 87.70299710333347,87.70299710333347
file name : Image_11032024144348331.png
|
2024-03-11 14:43:48.429269 |
323 |
67516540 |
Construction of roads |
349900 |
Construction of roads1 |
Completion of work |
-
latitude : 22.027690820395947,22.027690820395947
Longitude : 87.70297204144299,87.70297204144299
file name : Image_11032024143942323.png
|
2024-03-11 14:39:42.423653 |
324 |
66816756 |
Drainage line for grey water |
350000 |
Drainage line for grey water1 |
Roof laid |
-
latitude : 22.033188091591
Longitude : 87.70674590952694
file name : Image_28122023151150896.png
|
2023-12-28 15:11:50.985472 |
325 |
66816756 |
Drainage line for grey water |
350000 |
Drainage line for grey water1 |
Plinth level |
-
latitude : 22.018013116903603
Longitude : 87.70677851513028
file name : Image_28122023150841167.png
|
2023-12-28 15:08:41.257034 |
326 |
66816756 |
Drainage line for grey water |
350000 |
Drainage line for grey water1 |
Completion of work |
-
latitude : 22.03324890229851
Longitude : 87.70675638690591
file name : Image_20122023110204348.png
|
2023-12-20 11:02:04.490654 |
327 |
67517034 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.99241105467081,21.99240560643375
Longitude : 87.69619812257588,87.69621262326837
file name : Image_06122023124015573.png
|
2023-12-06 12:40:15.661999 |
328 |
67517034 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.99248389340937,21.992480708286166
Longitude : 87.6956429053098,87.69565623253584
file name : Image_04122023124135782.png
|
2023-12-04 12:41:35.871755 |
329 |
67517034 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.992179127410054,21.992245512083173
Longitude : 87.69681050442159,87.69685182720423
file name : Image_04122023122546521.png
|
2023-12-04 12:25:46.602756 |
330 |
66814382 |
Water Supply to villages |
185000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.01128869317472
Longitude : 87.69979856908321
file name : Image_01122023163243454.png
|
2023-12-01 16:32:43.53234 |
331 |
66814382 |
Water Supply to villages |
185000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.01124246697873
Longitude : 87.69987425766885
file name : Image_01122023162849876.png
|
2023-12-01 16:28:49.98123 |
332 |
66814382 |
Water Supply to villages |
185000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.011223356239498
Longitude : 87.69983838312328
file name : Image_29112023130808861.png
|
2023-11-29 13:08:08.944455 |
333 |
66814382 |
Water Supply to villages |
185000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.011223356239498
Longitude : 87.69983838312328
file name : Image_29112023130804498.png
|
2023-11-29 13:08:04.58196 |
334 |
66814382 |
Water Supply to villages |
185000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.011276916600764
Longitude : 87.6998180989176
file name : Image_29112023130801586.png
|
2023-11-29 13:08:01.670109 |
335 |
66829714 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.034304225817323,22.034304225817323
Longitude : 87.69223909825087,87.69223909825087
file name : Image_11122023131020387.png
|
2023-12-11 13:10:20.475594 |
336 |
66829714 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.03429999295622,22.03429999295622
Longitude : 87.69223968498409,87.69223968498409
file name : Image_11122023130615845.png
|
2023-12-11 13:06:15.945425 |
337 |
66829714 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.0341843,22.0341843
Longitude : 87.6927112,87.6927112
file name : Image_01122023114934212.png
|
2023-12-01 11:49:34.309914 |
338 |
66829714 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.0341839,22.0341839
Longitude : 87.6927061,87.6927061
file name : Image_28112023123921678.png
|
2023-11-28 12:39:21.77538 |
339 |
66814062 |
Water Supply to villages |
185000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.031156653538346
Longitude : 87.71697895601392
file name : Image_11122023124342900.png
|
2023-12-11 12:43:42.98298 |
340 |
66814062 |
Water Supply to villages |
185000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.031143787316978
Longitude : 87.71694417111576
file name : Image_11122023123937463.png
|
2023-12-11 12:39:37.577781 |
341 |
66814062 |
Water Supply to villages |
185000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.031151833944023
Longitude : 87.7170301694423
file name : Image_25112023154820359.png
|
2023-11-25 15:48:20.450354 |
342 |
66829453 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.027656622231007,22.027657125145197
Longitude : 87.69958918914199,87.69959086552262
file name : Image_11122023131655407.png
|
2023-12-11 13:16:55.521346 |
343 |
66829453 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.02766395639628,22.02766395639628
Longitude : 87.69918945617974,87.69918945617974
file name : Image_05122023151359874.png
|
2023-12-05 15:13:59.983796 |
344 |
66829453 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.02765507157892,22.02765394002199
Longitude : 87.69925659522414,87.69924955442548
file name : Image_05122023151306469.png
|
2023-12-05 15:13:06.587736 |
345 |
66829453 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.02758466359228,22.02758466359228
Longitude : 87.69944912753999,87.69944912753999
file name : Image_05122023145801001.png
|
2023-12-05 14:58:01.101371 |
346 |
66809317 |
Water Supply to villages |
80000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.041580053046346
Longitude : 87.70851256325841
file name : Image_29112023080913860.png
|
2023-11-29 08:09:13.956658 |
347 |
66809317 |
Water Supply to villages |
80000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.041605366393924
Longitude : 87.70846210420132
file name : Image_29112023080610444.png
|
2023-11-29 08:06:10.545164 |
348 |
66809317 |
Water Supply to villages |
80000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.041581100784242
Longitude : 87.70854625850916
file name : Image_28112023122951229.png
|
2023-11-28 12:29:51.327382 |
349 |
66814289 |
Water Supply to villages |
239876 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.0080547
Longitude : 87.6952579
file name : Image_19042024154624320.png
|
2024-04-19 15:46:24.411469 |
350 |
66814289 |
Water Supply to villages |
239876 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.0080543
Longitude : 87.6952589
file name : Image_19042024154428591.png
|
2024-04-19 15:44:28.680697 |
351 |
66814289 |
Water Supply to villages |
239876 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.0080541
Longitude : 87.6952594
file name : Image_19042024154026539.png
|
2024-04-19 15:40:26.633337 |
352 |
66815904 |
Drainage line for grey water |
191731 |
Drainage line for grey water1 |
Roof laid |
-
latitude : 22.0368264
Longitude : 87.7174863
file name : Image_09042024104953841.png
|
2024-04-09 10:49:53.926073 |
353 |
66815904 |
Drainage line for grey water |
191731 |
Drainage line for grey water1 |
Plinth level |
-
latitude : 22.036847
Longitude : 87.7174892
file name : Image_09042024104408536.png
|
2024-04-09 10:44:08.622669 |
354 |
66815904 |
Drainage line for grey water |
191731 |
Drainage line for grey water1 |
Completion of work |
-
latitude : 22.0368973
Longitude : 87.717492
file name : Image_09042024074802525.png
|
2024-04-09 07:48:02.64176 |
355 |
66816876 |
Grey water treatment plant |
346898 |
Grey water treatment plant1 |
Roof laid |
-
latitude : 22.0341871
Longitude : 87.6925358
file name : Image_03042024112024686.png
|
2024-04-03 11:20:24.778631 |
356 |
66816876 |
Grey water treatment plant |
346898 |
Grey water treatment plant1 |
Plinth level |
-
latitude : 22.0341878
Longitude : 87.6925363
file name : Image_03042024111806204.png
|
2024-04-03 11:18:06.305786 |
357 |
66816876 |
Grey water treatment plant |
346898 |
Grey water treatment plant1 |
Completion of work |
-
latitude : 22.0341875
Longitude : 87.6925375
file name : Image_03042024111410845.png
|
2024-04-03 11:14:10.945054 |
358 |
66814178 |
Water Supply to villages |
184747 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.043704236857593
Longitude : 87.69507989287376
file name : Image_16042024164725884.png
|
2024-04-16 16:47:25.994179 |
359 |
66814178 |
Water Supply to villages |
184747 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.0437219645828
Longitude : 87.69506312906742
file name : Image_16042024164113384.png
|
2024-04-16 16:41:13.48266 |
360 |
66814178 |
Water Supply to villages |
184747 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.04372783191502
Longitude : 87.69505315460265
file name : Image_16042024163737431.png
|
2024-04-16 16:37:37.527188 |
361 |
66813672 |
Water Supply to villages |
80000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.01480611693114
Longitude : 87.69369528628886
file name : Image_09112023124306912.png
|
2023-11-09 12:43:07.043443 |
362 |
66813672 |
Water Supply to villages |
80000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.01481127180159
Longitude : 87.69372487440705
file name : Image_09112023123909425.png
|
2023-11-09 12:39:09.660572 |
363 |
66813672 |
Water Supply to villages |
80000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.01480804476887
Longitude : 87.69379645586014
file name : Image_09112023123213072.png
|
2023-11-09 12:32:13.358249 |
364 |
58459682 |
Water Testing Expenses |
72000 |
Water Testing Expenses1 |
Plinth level |
-
latitude : 22.0090989
Longitude : 87.7019576
file name : Image_27122023170008425.png
|
2023-12-27 17:00:08.522387 |
365 |
58459682 |
Water Testing Expenses |
72000 |
Water Testing Expenses1 |
Completion of work |
-
latitude : 22.009212663397193
Longitude : 87.7019543107599
file name : Image_27122023165710304.png
|
2023-12-27 16:57:10.427097 |
366 |
58459682 |
Water Testing Expenses |
72000 |
Water Testing Expenses1 |
Completion of work |
-
latitude : 22.0091642
Longitude : 87.7019121
file name : Image_27122023165333368.png
|
2023-12-27 16:53:33.468291 |
367 |
67516205 |
Drinking water facilities |
349943 |
Drinking water facilities1 |
Roof laid |
-
latitude : 22.022612476721406
Longitude : 87.6809071842581
file name : Image_22042024171843377.png
|
2024-04-22 17:18:43.472534 |
368 |
67516205 |
Drinking water facilities |
349943 |
Drinking water facilities1 |
Plinth level |
-
latitude : 22.02260677702725
Longitude : 87.68085102550685
file name : Image_22042024171328948.png
|
2024-04-22 17:13:29.054268 |
369 |
67516205 |
Drinking water facilities |
349943 |
Drinking water facilities1 |
Completion of work |
-
latitude : 22.02262945007533
Longitude : 87.68089997582138
file name : Image_22042024170959241.png
|
2024-04-22 17:09:59.352313 |
370 |
58511535 |
Up Gradation of Community Toilet of Barbaria Hazra Vidyapith at Barbaria Sansad |
320000 |
Up Gradation of Community Toilet of Barbaria Hazra Vidyapith at Barbaria Sansad1 |
Roof laid |
-
latitude : 22.03781955409795
Longitude : 87.71382015198469
file name : Image_24082023090816832.png
|
2023-08-24 09:08:16.927862 |
371 |
58511535 |
Up Gradation of Community Toilet of Barbaria Hazra Vidyapith at Barbaria Sansad |
320000 |
Up Gradation of Community Toilet of Barbaria Hazra Vidyapith at Barbaria Sansad1 |
Plinth level |
-
latitude : 22.0379616
Longitude : 87.7145067
file name : Image_24082023090610898.png
|
2023-08-24 09:06:10.998841 |
372 |
58511535 |
Up Gradation of Community Toilet of Barbaria Hazra Vidyapith at Barbaria Sansad |
320000 |
Up Gradation of Community Toilet of Barbaria Hazra Vidyapith at Barbaria Sansad1 |
Plinth level |
-
latitude : 22.03831492457539
Longitude : 87.71374613977969
file name : Image_24082023090605828.png
|
2023-08-24 09:06:05.935779 |
373 |
58511535 |
Up Gradation of Community Toilet of Barbaria Hazra Vidyapith at Barbaria Sansad |
320000 |
Up Gradation of Community Toilet of Barbaria Hazra Vidyapith at Barbaria Sansad1 |
Completion of work |
-
latitude : 22.0382054
Longitude : 87.7136135
file name : Image_24082023090043185.png
|
2023-08-24 09:00:43.287369 |
374 |
67516865 |
Construction of roads |
349900 |
Construction of roads1 |
Roof laid |
-
latitude : 22.01653580646962,22.01653580646962
Longitude : 87.68071968108416,87.68071968108416
file name : Image_13032024143018732.png
|
2024-03-13 14:30:18.657143 |
375 |
67516865 |
Construction of roads |
349900 |
Construction of roads1 |
Plinth level |
-
latitude : 22.016557012684643,22.016557012684643
Longitude : 87.68071725033224,87.68071725033224
file name : Image_13032024142552528.png
|
2024-03-13 14:25:52.638254 |
376 |
67516865 |
Construction of roads |
349900 |
Construction of roads1 |
Plinth level |
-
latitude : 22.016539913602173,22.01654661912471
Longitude : 87.68071616068482,87.68072026781738
file name : Image_13032024142335901.png
|
2024-03-13 14:23:35.996847 |
377 |
67516865 |
Construction of roads |
349900 |
Construction of roads1 |
Completion of work |
-
latitude : 22.0090901,22.0090901
Longitude : 87.701962,87.701962
file name : Image_13032024141128859.png
|
2024-03-13 14:11:28.766977 |
378 |
68829903 |
Drainage Construction |
559306 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.99392838869244
Longitude : 87.69798832945526
file name : Image_04042024125111895.png
|
2024-04-04 12:51:11.981688 |
379 |
68829903 |
Drainage Construction |
559306 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.9946282
Longitude : 87.6980483
file name : Image_04042024124555934.png
|
2024-04-04 12:45:56.018198 |
380 |
68829903 |
Drainage Construction |
559306 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.9946277
Longitude : 87.6980461
file name : Image_04042024123750389.png
|
2024-04-04 12:37:50.477567 |
381 |
69556563 |
Construction of toilets in public institutions |
380000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 22.03647513873875
Longitude : 87.70726935938
file name : Image_28122023094845037.png
|
2023-12-28 09:48:45.112945 |
382 |
69556563 |
Construction of toilets in public institutions |
380000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 22.03645988367498
Longitude : 87.70719819702208
file name : Image_28112023114207120.png
|
2023-11-28 11:42:07.220012 |
383 |
69556563 |
Construction of toilets in public institutions |
380000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 22.036514240317047
Longitude : 87.70729014649987
file name : Image_24112023140358435.png
|
2023-11-24 14:03:58.553487 |