1 |
33925056 |
Extension of Pipe Line Pry School |
25500 |
Extension of Pipe Line Pry School1 |
Plinth level |
-
latitude : 22.03885124064982,22.03885124064982
Longitude : 87.94748087413609,87.94748087413609
file name : Image_08102021142752213.png
|
2021-10-08 14:27:52.321589 |
2 |
33925056 |
Extension of Pipe Line Pry School |
25500 |
Extension of Pipe Line Pry School1 |
Completion of work |
-
latitude : 22.038835398852825,22.038926677778363
Longitude : 87.94750400818884,87.9474840592593
file name : Image_07102021155538741.png
|
2021-10-07 15:55:38.89835 |
3 |
33925004 |
Extension of Pipe Line Sabir |
28500 |
Extension of Pipe Line Sabir1 |
Plinth level |
-
latitude : 22.04372582025826,22.04372582025826
Longitude : 87.94830791652203,87.94830791652203
file name : Image_08102021141502279.png
|
2021-10-08 14:15:02.518062 |
4 |
33925004 |
Extension of Pipe Line Sabir |
28500 |
Extension of Pipe Line Sabir1 |
Completion of work |
-
latitude : 22.043722006492317,22.043722509406507
Longitude : 87.94836382381618,87.94836164452136
file name : Image_07102021153909696.png
|
2021-10-07 15:39:09.818946 |
5 |
33925084 |
Extension of Pipe Line Sahajahan |
25500 |
Extension of Pipe Line Sahajahan1 |
Plinth level |
-
latitude : 22.039032457396388,22.039032457396388
Longitude : 87.94766242615879,87.94766242615879
file name : Image_08102021142628611.png
|
2021-10-08 14:26:28.780355 |
6 |
33925084 |
Extension of Pipe Line Sahajahan |
25500 |
Extension of Pipe Line Sahajahan1 |
Completion of work |
-
latitude : 22.039068834856153,22.039068834856153
Longitude : 87.94767927378416,87.94767927378416
file name : Image_07102021155425690.png
|
2021-10-07 15:54:25.882651 |
7 |
33924970 |
Extension of Pipe Line Umar Faruk |
18500 |
Extension of Pipe Line Umar Faruk1 |
Plinth level |
-
latitude : 22.043696525506675,22.043696525506675
Longitude : 87.94831822626293,87.94831822626293
file name : Image_08102021141555320.png
|
2021-10-08 14:15:55.472003 |
8 |
33924970 |
Extension of Pipe Line Umar Faruk |
18500 |
Extension of Pipe Line Umar Faruk1 |
Completion of work |
-
latitude : 22.043730346485972,22.043769992887974
Longitude : 87.94838762842119,87.94836290180683
file name : Image_07102021154030172.png
|
2021-10-07 15:40:30.279661 |
9 |
33925030 |
Extension of Pipe Line Belal |
18500 |
Extension of Pipe Line Belal1 |
Plinth level |
-
latitude : 22.044457560405135,22.04446074552834
Longitude : 87.94440211728215,87.94441125355661
file name : Image_08102021141950681.png
|
2021-10-08 14:19:50.810566 |
10 |
33925030 |
Extension of Pipe Line Belal |
18500 |
Extension of Pipe Line Belal1 |
Completion of work |
-
latitude : 22.044297172687948,22.044311966747046
Longitude : 87.94446456246078,87.94445567764342
file name : Image_07102021154601851.png
|
2021-10-07 15:46:01.96292 |
11 |
33870491 |
Sinking of a New Tube Well Sahalam |
172000 |
Sinking of a New Tube Well Sahalam1 |
Plinth level |
-
latitude : 22.01514223124832
Longitude : 87.96990104019642
file name : Image_27102021133453257.png
|
2021-10-27 13:34:53.379784 |
12 |
33870491 |
Sinking of a New Tube Well Sahalam |
172000 |
Sinking of a New Tube Well Sahalam1 |
Completion of work |
-
latitude : 22.015200150199234
Longitude : 87.97000028192997
file name : Image_08102021134439666.png
|
2021-10-08 13:44:39.79965 |
13 |
39085710 |
Sinking of a New Tube Well Ashoke Pramanik |
171239 |
Sinking of a New Tube Well Ashoke Pramanik1 |
Completion of work |
-
latitude : 22.0267634
Longitude : 87.9701145
file name : Image_26072021141811578.png
|
2021-07-26 14:18:11.684021 |
14 |
39085710 |
Sinking of a New Tube Well Ashoke Pramanik |
171239 |
Sinking of a New Tube Well Ashoke Pramanik1 |
Completion of work |
-
latitude : 22.0267868
Longitude : 87.9701241
file name : Image_06072021113855635.png
|
2021-07-06 11:38:55.849582 |
15 |
33853858 |
Upgradation of road with Cement Concrete Illiyas |
249575 |
Upgradation of road with Cement Concrete Illiyas1 |
Completion of work |
-
latitude : 22.001949828118086,22.001949828118086
Longitude : 87.9732230398804,87.9732230398804
file name : Image_28032022145128625.png
|
2022-03-28 14:51:28.776508 |
16 |
33853858 |
Upgradation of road with Cement Concrete Illiyas |
249575 |
Upgradation of road with Cement Concrete Illiyas1 |
Completion of work |
-
latitude : 22.011594171635807,22.011594171635807
Longitude : 87.97839676961303,87.97839676961303
file name : Image_22122021151317153.png
|
2021-12-22 15:13:17.244488 |
17 |
33879496 |
Upgradation of road Nila |
159802 |
Upgradation of road Nila1 |
Plinth level |
-
latitude : 22.0117076,22.0117079
Longitude : 87.9771639,87.9771642
file name : Image_26082021170422948.png
|
2021-08-26 17:04:23.037837 |
18 |
33879496 |
Upgradation of road Nila |
159802 |
Upgradation of road Nila1 |
Completion of work |
-
latitude : 22.01161680277437,22.01161680277437,22.011611983180046,22.011611186899245
Longitude : 87.97755438834429,87.97755438834429,87.97755824401975,87.9775570705533
file name : Image_14072021171921251.png
|
2021-07-14 17:19:21.349418 |
19 |
33924333 |
Upgradation of road Das |
254924 |
Upgradation of road Das1 |
Plinth level |
-
latitude : 22.031111558899283,22.031177231110632
Longitude : 87.96128754504025,87.9613365791738
file name : Image_26082021164959741.png
|
2021-08-26 16:49:59.848357 |
20 |
33924333 |
Upgradation of road Das |
254924 |
Upgradation of road Das1 |
Completion of work |
-
latitude : 22.031153049319983,22.031166586093605
Longitude : 87.96133196912706,87.9613352380693
file name : Image_14082021181131034.png
|
2021-08-14 18:11:31.117956 |
21 |
33924887 |
Sinking of a New Tube Well Pachu |
150000 |
Sinking of a New Tube Well Pachu1 |
Plinth level |
-
latitude : 22.04314478673041
Longitude : 87.95160225592554
file name : Image_25082021172013389.png
|
2021-08-25 17:20:13.474313 |
22 |
33924887 |
Sinking of a New Tube Well Pachu |
150000 |
Sinking of a New Tube Well Pachu1 |
Completion of work |
-
latitude : 22.043183888308704
Longitude : 87.95162153430283
file name : Image_12082021123833997.png
|
2021-08-12 12:38:34.117235 |
23 |
39085685 |
Sinking of a New Tube Well Kanai Dutta |
171250 |
Sinking of a New Tube Well Kanai Dutta1 |
Completion of work |
-
latitude : 22.02451764140278
Longitude : 87.97196567058563
file name : Image_12022022150939125.png
|
2022-02-12 15:09:39.296896 |
24 |
33881699 |
Construction of Concrete Guard Wall Madhya |
99890 |
Construction of Concrete Guard Wall Madhya1 |
Plinth level |
-
latitude : 22.025286932475865,22.025286932475865
Longitude : 87.98060749657452,87.98060749657452
file name : Image_17022022144122068.png
|
2022-02-17 14:41:22.207028 |
25 |
33881699 |
Construction of Concrete Guard Wall Madhya |
99890 |
Construction of Concrete Guard Wall Madhya1 |
Completion of work |
-
latitude : 22.025245022960007,22.025245022960007
Longitude : 87.98056072555482,87.98056072555482
file name : Image_12022022151438794.png
|
2022-02-12 15:14:38.921343 |
26 |
39085719 |
Extension of PVC Pipe line near Supriya Sahoo |
37980 |
Extension of PVC Pipe line near Supriya Sahoo1 |
Plinth level |
-
latitude : 22.018921673297882,22.01889619231224
Longitude : 87.96265278942883,87.96265672892332
file name : Image_22092021133757297.png
|
2021-09-22 13:37:57.407218 |
27 |
39085719 |
Extension of PVC Pipe line near Supriya Sahoo |
37980 |
Extension of PVC Pipe line near Supriya Sahoo1 |
Completion of work |
-
latitude : 22.018897575326264,22.0188593538478
Longitude : 87.96273208223283,87.9625747539103
file name : Image_21092021132729926.png
|
2021-09-21 13:27:30.01711 |
28 |
69882906 |
Water Supply to villages |
30000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.012868472374976,22.012868472374976
Longitude : 87.98059257678688,87.98059257678688
file name : Image_24082024145519821.png
|
2024-08-24 14:55:19.915354 |
29 |
69882906 |
Water Supply to villages |
30000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.012833687476814,22.012833687476814
Longitude : 87.98051420599222,87.98051420599222
file name : Image_24082024144727859.png
|
2024-08-24 14:47:27.954317 |
30 |
70196983 |
Purchase of Sanitary Pad Dispenser |
50000 |
Purchase of Sanitary Pad Dispenser1 |
Plinth level |
-
latitude : 22.0115962
Longitude : 87.975778
file name : Image_05092024143451620.png
|
2024-09-05 14:34:51.699661 |
31 |
70196983 |
Purchase of Sanitary Pad Dispenser |
50000 |
Purchase of Sanitary Pad Dispenser1 |
Completion of work |
-
latitude : 22.0115764
Longitude : 87.9758009
file name : Image_05092024142358275.png
|
2024-09-05 14:23:58.361102 |
32 |
70196983 |
Purchase of Sanitary Pad Dispenser |
50000 |
Purchase of Sanitary Pad Dispenser1 |
Completion of work |
-
latitude : 22.0115409
Longitude : 87.9758126
file name : Image_05092024142828076.png
|
2024-09-05 14:28:28.154619 |
33 |
39085652 |
Sub Mersible Pump and PVC water Tank near Goutam |
171240 |
Sub Mersible Pump and PVC water Tank near Goutam1 |
Plinth level |
-
latitude : 22.0033575
Longitude : 87.9831982
file name : Image_24112021162327474.png
|
2021-11-24 16:23:27.57066 |
34 |
39085652 |
Sub Mersible Pump and PVC water Tank near Goutam |
171240 |
Sub Mersible Pump and PVC water Tank near Goutam1 |
Completion of work |
-
latitude : 22.0033568
Longitude : 87.9831982
file name : Image_23112021170315830.png
|
2021-11-23 17:03:15.911147 |
35 |
33924772 |
Repairing of Earth road Sudip |
129232 |
Repairing of Earth road Sudip1 |
Plinth level |
-
latitude : 22.03903518151492,22.039062632247806
Longitude : 87.96520113945007,87.96521262265742
file name : Image_08122021134634003.png
|
2021-12-08 13:46:34.141737 |
36 |
33924772 |
Repairing of Earth road Sudip |
129232 |
Repairing of Earth road Sudip1 |
Completion of work |
-
latitude : 22.039109780453146,22.039068122394383,22.039068373851478
Longitude : 87.96516970731318,87.96512888744473,87.96502780169249
file name : Image_30112021153210304.png
|
2021-11-30 15:32:10.426566 |
37 |
33870999 |
Sinking of a New Tube Well Imran |
171239 |
Sinking of a New Tube Well Imran1 |
Plinth level |
-
latitude : 22.017056616023183
Longitude : 87.97093628905714
file name : Image_15032022173916264.png
|
2022-03-15 17:39:16.38581 |
38 |
33870999 |
Sinking of a New Tube Well Imran |
171239 |
Sinking of a New Tube Well Imran1 |
Completion of work |
-
latitude : 22.017057496123016
Longitude : 87.97093084082007
file name : Image_07032022165433115.png
|
2022-03-07 16:54:33.234446 |
39 |
33924661 |
Sinking of a New Tube Well Gurupada |
324500 |
Sinking of a New Tube Well Gurupada1 |
Plinth level |
-
latitude : 22.03901866916567
Longitude : 87.96584880910814
file name : Image_15122021121646307.png
|
2021-12-15 12:16:46.410933 |
40 |
33924661 |
Sinking of a New Tube Well Gurupada |
324500 |
Sinking of a New Tube Well Gurupada1 |
Completion of work |
-
latitude : 22.03892106190324
Longitude : 87.96592617407441
file name : Image_08122021134920520.png
|
2021-12-08 13:49:20.648734 |
41 |
39094194 |
Upgradation of road from pitch road |
165928 |
Upgradation of road from pitch road1 |
Plinth level |
-
latitude : 22.0034416,22.0034445
Longitude : 87.9788969,87.9788967
file name : Image_30122021131424187.png
|
2021-12-30 13:14:24.295936 |
42 |
33852538 |
Extension of PVC Pipe line Swarnendu |
39960 |
Extension of PVC Pipe line Swarnendu1 |
Plinth level |
-
latitude : 22.0118042,22.01007591560483
Longitude : 87.974098,87.98021606169641
file name : Image_23122021145619987.png
|
2021-12-23 14:56:20.158738 |
43 |
33852538 |
Extension of PVC Pipe line Swarnendu |
39960 |
Extension of PVC Pipe line Swarnendu1 |
Completion of work |
-
latitude : 22.01001196168363,22.0105906
Longitude : 87.98017582856119,87.9799629
file name : Image_22122021160611560.png
|
2021-12-22 16:06:11.654763 |
44 |
39085640 |
Repairing of Earth road with UC Ballah Pilling Conc road to Tapan |
74450 |
Repairing of Earth road with UC Ballah Pilling Conc road to Tapan 1 |
Plinth level |
-
latitude : 22.0091087,22.0094372
Longitude : 87.9721768,87.972833
file name : Image_30122021130435246.png
|
2021-12-30 13:04:35.34073 |
45 |
39085640 |
Repairing of Earth road with UC Ballah Pilling Conc road to Tapan |
74450 |
Repairing of Earth road with UC Ballah Pilling Conc road to Tapan 1 |
Completion of work |
-
latitude : 22.0091038,22.0093001
Longitude : 87.9721706,87.9726874
file name : Image_29122021140121785.png
|
2021-12-29 14:01:21.941335 |
46 |
33875087 |
Upgradation of road Bazar |
272738 |
Upgradation of road Bazar1 |
Plinth level |
-
latitude : 22.0106592,22.0106592
Longitude : 87.9761573,87.9761573
file name : Image_30122021132158005.png
|
2021-12-30 13:21:58.114392 |
47 |
33875087 |
Upgradation of road Bazar |
272738 |
Upgradation of road Bazar1 |
Completion of work |
-
latitude : 22.011519321240485,22.011519321240485
Longitude : 87.97547944821417,87.97547944821417
file name : Image_29122021140631733.png
|
2021-12-29 14:06:31.840676 |
48 |
33883931 |
Sinking of a New Tube Well Mansur |
171239 |
Sinking of a New Tube Well Mansur1 |
Plinth level |
-
latitude : 22.009823159314692
Longitude : 87.97010857611895
file name : Image_07032022164741979.png
|
2022-03-07 16:47:42.092027 |
49 |
33883931 |
Sinking of a New Tube Well Mansur |
171239 |
Sinking of a New Tube Well Mansur1 |
Completion of work |
-
latitude : 22.0089829
Longitude : 87.9707682
file name : Image_28022022122728868.png
|
2022-02-28 12:27:28.958836 |
50 |
33882235 |
Construction of Tale Pilling Milan |
128845 |
Construction of Tale Pilling Milan1 |
Completion of work |
-
latitude : 22.010244433768094,22.01021057087928
Longitude : 87.96967472881079,87.96960574574769
file name : Image_17022022152702248.png
|
2022-02-17 15:27:02.382049 |
51 |
33924815 |
Upgradation of road Bharat |
343647 |
Upgradation of road Bharat1 |
Plinth level |
-
latitude : 22.042878451757133,22.042878451757133
Longitude : 87.9512739367783,87.9512739367783
file name : Image_27012022135930611.png
|
2022-01-27 13:59:30.743728 |
52 |
33924815 |
Upgradation of road Bharat |
343647 |
Upgradation of road Bharat1 |
Completion of work |
-
latitude : 22.042866465635598,22.042866465635598
Longitude : 87.95126371085644,87.95126371085644
file name : Image_25012022142015238.png
|
2022-01-25 14:20:15.353531 |
53 |
39094165 |
Upgradation of road Paritosh Nayak |
330000 |
Upgradation of road Paritosh Nayak1 |
Plinth level |
-
latitude : 22.0046856,22.0046856
Longitude : 87.9786544,87.9786544
file name : Image_29012022145801982.png
|
2022-01-29 14:58:02.170686 |
54 |
39094165 |
Upgradation of road Paritosh Nayak |
330000 |
Upgradation of road Paritosh Nayak1 |
Completion of work |
-
latitude : 22.00501659885049,22.00501659885049
Longitude : 87.97883179038763,87.97883179038763
file name : Image_28012022144645506.png
|
2022-01-28 14:46:45.625618 |
55 |
33884453 |
Construction of Tale Pilling Prabodh |
164934 |
Construction of Tale Pilling Prabodh1 |
Plinth level |
-
latitude : 22.020782036706805,22.020782036706805
Longitude : 87.96172524802387,87.96172524802387
file name : Image_26032022151926749.png
|
2022-03-26 15:19:26.908422 |
56 |
33884453 |
Construction of Tale Pilling Prabodh |
164934 |
Construction of Tale Pilling Prabodh1 |
Completion of work |
-
latitude : 22.020744066685438,22.020744066685438
Longitude : 87.96183220110834,87.96183220110834
file name : Image_21032022171830230.png
|
2022-03-21 17:18:30.325724 |
57 |
39087504 |
Upgradation of road with Cement Concrete Sk Jaynalss house to Kutubuddin |
194200 |
Upgradation of road with Cement Concrete Sk Jaynalss house to Kutubuddin1 |
Plinth level |
-
latitude : 22.043954017572105,22.043941486626863
Longitude : 87.94641586951911,87.94644000940025
file name : Image_30032022142143234.png
|
2022-03-30 14:21:43.338775 |
58 |
39087504 |
Upgradation of road with Cement Concrete Sk Jaynalss house to Kutubuddin |
194200 |
Upgradation of road with Cement Concrete Sk Jaynalss house to Kutubuddin1 |
Completion of work |
-
latitude : 22.044053049758077,22.044053049758077
Longitude : 87.94650027528405,87.94650027528405
file name : Image_16032022181513152.png
|
2022-03-16 18:15:13.231896 |
59 |
33872606 |
Upgradation of road Rabi |
89573 |
Upgradation of road Rabi1 |
Completion of work |
-
latitude : 22.017440549097955,22.017440549097955
Longitude : 87.97094467096031,87.97094467096031
file name : Image_16032022175939504.png
|
2022-03-16 17:59:39.625922 |
60 |
39085638 |
Upgradation of road with Cement Concrete with UC Ballah Pilling from Rafikul Shop |
229681 |
Upgradation of road with Cement Concrete with UC Ballah Pilling from Rafikul Shop1 |
Plinth level |
-
latitude : 22.0090033,22.0090033
Longitude : 87.9709668,87.9709668
file name : Image_26032022150649153.png
|
2022-03-26 15:06:49.283397 |
61 |
39085638 |
Upgradation of road with Cement Concrete with UC Ballah Pilling from Rafikul Shop |
229681 |
Upgradation of road with Cement Concrete with UC Ballah Pilling from Rafikul Shop1 |
Completion of work |
-
latitude : 22.0089663,22.0089663
Longitude : 87.9708307,87.9708307
file name : Image_21032022170923525.png
|
2022-03-21 17:09:23.616787 |
62 |
39094533 |
Construction of Ground Floor infront of Nandigram G.P |
349475 |
Construction of Ground Floor infront of Nandigram G.P1 |
Completion of work |
-
latitude : 22.0147032
Longitude : 87.9736909
file name : Image_26032022144609899.png
|
2022-03-26 14:46:10.00313 |
63 |
39085672 |
Sinking of a New Tube Well Mobarak Babu |
189450 |
Sinking of a New Tube Well Mobarak Babu1 |
Plinth level |
-
latitude : 22.014263137243688
Longitude : 87.97179560177028
file name : Image_27032022124150866.png
|
2022-03-27 12:41:50.98476 |
64 |
39085672 |
Sinking of a New Tube Well Mobarak Babu |
189450 |
Sinking of a New Tube Well Mobarak Babu1 |
Completion of work |
-
latitude : 22.014342513866723
Longitude : 87.97177640721202
file name : Image_26032022145956704.png
|
2022-03-26 14:59:56.829965 |
65 |
33871470 |
Repairing of Earth road Jame Masjid |
179800 |
Repairing of Earth road Jame Masjid1 |
Plinth level |
-
latitude : 22.01609479263425,22.016147472895682
Longitude : 87.96996499411762,87.96996876597404
file name : Image_30032022161858004.png
|
2022-03-30 16:18:58.087465 |
66 |
33871470 |
Repairing of Earth road Jame Masjid |
179800 |
Repairing of Earth road Jame Masjid1 |
Completion of work |
-
latitude : 22.01632676180452,22.016318254172802
Longitude : 87.97077611088753,87.97071190550923
file name : Image_26032022145551631.png
|
2022-03-26 14:55:51.787771 |
67 |
39085644 |
Construction of Boundary Wall arround Battala Jame |
99820 |
Construction of Boundary Wall arround Battala Jame1 |
Plinth level |
-
latitude : 22.01647541485727,22.016457854770124
Longitude : 87.97109261155128,87.97109956853092
file name : Image_26032022145157769.png
|
2022-03-26 14:51:57.891749 |
68 |
39085644 |
Construction of Boundary Wall arround Battala Jame |
99820 |
Construction of Boundary Wall arround Battala Jame1 |
Completion of work |
-
latitude : 22.01635873876512,22.016358319669962
Longitude : 87.97105807811022,87.97105967067182
file name : Image_25032022164448146.png
|
2022-03-25 16:44:48.262636 |
69 |
33924728 |
Upgradation of road Gurupada |
25000 |
Upgradation of road Gurupada1 |
Completion of work |
-
latitude : 22.04259053338319,22.04259053338319
Longitude : 87.96329626813531,87.96329626813531
file name : Image_28032022140158396.png
|
2022-03-28 14:01:58.481867 |
70 |
33874402 |
Construction of Concrete Ghat Hari Mandir |
99900 |
Construction of Concrete Ghat Hari Mandir1 |
Completion of work |
-
latitude : 22.0221871
Longitude : 87.9689642
file name : Image_31032022160452202.png
|
2022-03-31 16:04:52.295646 |
71 |
33874402 |
Construction of Concrete Ghat Hari Mandir |
99900 |
Construction of Concrete Ghat Hari Mandir1 |
Plinth level |
-
latitude : 22.0221885
Longitude : 87.9689645
file name : Image_31032022161144978.png
|
2022-03-31 16:11:45.069462 |
72 |
49038541 |
Sinking of a New Tube Well with Sub Mersible Pump and PVC Pipe Line Extension near Tajpur Paschim Pa |
179446 |
Sinking of a New Tube Well with Sub Mersible Pump and PVC Pipe Line Extension near Tajpur Paschim Pa1 |
Completion of work |
-
latitude : 22.030978621914983
Longitude : 87.9522636719048
file name : Image_12122022152105187.png
|
2022-12-12 15:21:05.291847 |
73 |
49037080 |
Sinking of a New Tube Well with Sub Mersible Pump near Nandigram Bazar Pucca Pool |
171240 |
Sinking of a New Tube Well with Sub Mersible Pump near Nandigram Bazar Pucca Pool1 |
Completion of work |
-
latitude : 22.0109148
Longitude : 87.9754231
file name : Image_12122022135119448.png
|
2022-12-12 13:51:19.577238 |
74 |
56586030 |
Construction of Concrete road with Tale Pilling from Concrete road to Samad Tulla house |
50000 |
Construction of Concrete road with Tale Pilling from Concrete road to Samad Tulla house1 |
Completion of work |
-
latitude : 22.007702621631324,22.007702621631324
Longitude : 87.96972912736237,87.96972912736237
file name : Image_28122023145943887.png
|
2023-12-28 14:59:43.996423 |
75 |
70228796 |
Water Supply to villages |
171257 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.045247931964695
Longitude : 87.9648544639349
file name : Image_29122023124819593.png
|
2023-12-29 12:48:19.689116 |
76 |
70228796 |
Water Supply to villages |
171257 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.04525568522513
Longitude : 87.96480886638165
file name : Image_28122023144256536.png
|
2023-12-28 14:42:56.629358 |
77 |
56586056 |
Construction of Tale Pilling with Earth Work from Akhreja Bibi house to Sk Safiur house |
56528 |
Construction of Tale Pilling with Earth Work from Akhreja Bibi house to Sk Safiur house1 |
Completion of work |
-
latitude : 22.01107935514301,22.01107935514301
Longitude : 87.97113846056163,87.97113846056163
file name : Image_28122023150252505.png
|
2023-12-28 15:02:52.61478 |
78 |
56638963 |
Construction of Concrete road from Chandan Das house to Manoranjan Das house |
139958 |
Construction of Concrete road from Chandan Das house to Manoranjan Das house1 |
Completion of work |
-
latitude : 22.02529912814498,22.025299044325948
Longitude : 87.98034598119557,87.98034547828138
file name : Image_28122023140142320.png
|
2023-12-28 14:01:42.40936 |
79 |
70049661 |
Creation of a new source of drinking water |
171257 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.042270386591554
Longitude : 87.951799063012
file name : Image_23072024133648901.png
|
2024-07-23 13:36:49.014798 |
80 |
70049661 |
Creation of a new source of drinking water |
171257 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.042375495657325
Longitude : 87.95176930725574
file name : Image_29122023125449993.png
|
2023-12-29 12:54:50.078872 |
81 |
70049661 |
Creation of a new source of drinking water |
171257 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.04241338185966
Longitude : 87.95180518180132
file name : Image_28122023143630621.png
|
2023-12-28 14:36:30.726128 |
82 |
49036894 |
Sinking of a New Tube Well with Sub Mersible Pump near Anutosh Nayak house |
171257 |
Sinking of a New Tube Well with Sub Mersible Pump near Anutosh Nayak house1 |
Completion of work |
-
latitude : 22.005096981301904
Longitude : 87.98000475391746
file name : Image_22112022152234267.png
|
2022-11-22 15:22:34.369071 |
83 |
49039152 |
Sinking of a New Tube Well with Sub Mersible Pump and PVC Pipe Line Extension near Sunil Jana |
171257 |
Sinking of a New Tube Well with Sub Mersible Pump and PVC Pipe Line Extension near Sunil Jana1 |
Completion of work |
-
latitude : 22.040305249392986
Longitude : 87.95169965364039
file name : Image_31122022134246910.png
|
2022-12-31 13:42:47.020566 |
84 |
57518922 |
Construction of Culvert near Bangabandhu Club |
150000 |
Construction of Culvert near Bangabandhu Club1 |
Completion of work |
-
latitude : 22.018095762468874
Longitude : 87.97075054608285
file name : Image_28122023135315319.png
|
2023-12-28 13:53:15.409145 |
85 |
49018067 |
Construction of Guard Wall at Saikat Khan pond |
99910 |
Construction of Guard Wall at Saikat Khan pond1 |
Completion of work |
-
latitude : 22.0020225,22.0020229
Longitude : 87.9741605,87.9741627
file name : Image_05122022142107493.png
|
2022-12-05 14:21:07.597382 |
86 |
49018160 |
Construction of Tale Pilling in both side of Mobarak babu pond |
129356 |
Construction of Tale Pilling in both side of Mobarak babu pond1 |
Completion of work |
-
latitude : 22.01438048388809,22.014295575208962
Longitude : 87.97150013968349,87.9716946836561
file name : Image_18012023133648395.png
|
2023-01-18 13:36:48.488533 |
87 |
49020577 |
Construction of Boundary Wall around Nandanayakbar Tarun Club Ground |
129213 |
Construction of Boundary Wall around Nandanayakbar Tarun Club Ground1 |
Completion of work |
-
latitude : 22.025249172002077,22.025249172002077
Longitude : 87.98129439353943,87.98129439353943
file name : Image_17112022163529111.png
|
2022-11-17 16:35:29.226261 |
88 |
49021331 |
Construction of Concrete road from Sk Safi house to Abdul Haque house |
174210 |
Construction of Concrete road from Sk Safi house to Abdul Haque house1 |
Completion of work |
-
latitude : 22.01185132842511,22.01185132842511
Longitude : 87.96793791465461,87.96793791465461
file name : Image_17112022165601151.png
|
2022-11-17 16:56:01.274123 |
89 |
46982673 |
Construction of Concrete road from Dibyendu Sasmal's house to Suprasad Jana's Land at Nandigram-XII |
272374 |
Construction of Concrete road from Dibyendu Sasmal's house to Suprasad Jana's Land at Nandigram-XII 1 |
Completion of work |
-
latitude : 22.04639319330454,22.04639319330454
Longitude : 87.95292408205569,87.95292408205569
file name : Image_22112022152115559.png
|
2022-11-22 15:21:15.664892 |
90 |
49036114 |
Sinking of a NEw Tube Well with Sub Mersible Pump near Amal Jana house |
171240 |
Sinking of a NEw Tube Well with Sub Mersible Pump near Amal Jana house1 |
Completion of work |
-
latitude : 22.0100882
Longitude : 87.9783438
file name : Image_05122022141112420.png
|
2022-12-05 14:11:12.518376 |
91 |
49038676 |
Extension of PVC Pipe Line from near Mahendra Santra's Submercible Pump to SSK School via Rabi Das |
24886 |
Extension of PVC Pipe Line from near Mahendra Santra's Submercible Pump to SSK School via Rabi Das1 |
Completion of work |
-
latitude : 22.0246377,22.0246377
Longitude : 87.965944,87.965944
file name : Image_03022023152933827.png
|
2023-02-03 15:29:34.018344 |
92 |
49037897 |
Extension of PVC Pipe Line from near Ajit Dass house Submercible Pump to ICDS School |
22759 |
Extension of PVC Pipe Line from near Ajit Dass house Submercible Pump to ICDS School1 |
Completion of work |
-
latitude : 22.014382579363883,22.014381531625986
Longitude : 87.97714007087052,87.97711509279907
file name : Image_03022023154223620.png
|
2023-02-03 15:42:23.733988 |
93 |
49037632 |
Extension of PVC Pipe Line from near Sk Ummeds house Submercible Pump to Dali Bibi |
25868 |
Extension of PVC Pipe Line from near Sk Ummeds house Submercible Pump to Dali Bibi1 |
Completion of work |
-
latitude : 22.02099808026105,22.02099808026105
Longitude : 87.97533863224089,87.97533863224089
file name : Image_24012023170145453.png
|
2023-01-24 17:01:45.547471 |
94 |
49037296 |
Extension of PVC Pipe Line from near Laxman Dass house Submercible Pump to Balai Tripathy |
24726 |
Extension of PVC Pipe Line from near Laxman Dass house Submercible Pump to Balai Tripathy1 |
Completion of work |
-
latitude : 22.0086316,22.0086316
Longitude : 87.9769019,87.9769019
file name : Image_24012023144308344.png
|
2023-01-24 14:43:08.462294 |
95 |
49037998 |
Extension of PVC Pipe Line from near Ajit Dass house Submercible Pump toPaltu Maity |
24393 |
Extension of PVC Pipe Line from near Ajit Dass house Submercible Pump toPaltu Maity1 |
Completion of work |
-
latitude : 22.015152415260673,22.015152415260673
Longitude : 87.97750267200172,87.97750267200172
file name : Image_21112022150338616.png
|
2022-11-21 15:03:38.710848 |
96 |
49038090 |
Sinking of a New Tube Well with Sub Mersible Pump near Manoranjan Dass Pond |
171257 |
Sinking of a New Tube Well with Sub Mersible Pump near Manoranjan Dass Pond 1 |
Completion of work |
-
latitude : 22.023793780244887
Longitude : 87.98307470977306
file name : Image_08122022164818496.png
|
2022-12-08 16:48:18.59902 |
97 |
46982817 |
Copnstruction of Tale Pilling from Mahasin Khan's house to Umar Faruk Khan's house at Nandigram-XIII |
223101 |
Copnstruction of Tale Pilling from Mahasin Khan's house to Umar Faruk Khan's house at Nandigram-XIII1 |
Completion of work |
-
latitude : 22.043632655404508,22.043632655404508,22.043597451411188
Longitude : 87.94853162951767,87.94853162951767,87.94852660037577
file name : Image_12122022150359669.png
|
2022-12-12 15:03:59.760657 |
98 |
49036598 |
Sinking of a New Tube Well With Sub Mersible Pump and PVC Line Extension near Pirer Than |
179481 |
Sinking of a New Tube Well With Sub Mersible Pump and PVC Line Extension near Pirer Than1 |
Completion of work |
-
latitude : 22.007474550046027
Longitude : 87.96874458901584
file name : Image_19122022152131803.png
|
2022-12-19 15:21:31.894314 |
99 |
49038416 |
Sinking of a New Tube Well with Sub Mersible Pump near Dulal Khanra |
171240 |
Sinking of a New Tube Well with Sub Mersible Pump near Dulal Khanra1 |
Completion of work |
-
latitude : 22.022969545796514
Longitude : 87.96332049183547
file name : Image_31122022132931247.png
|
2022-12-31 13:29:31.35983 |
100 |
49038980 |
Sinking of a New Tube Well with Sub Mersible Pump near Shankar Bera |
324370 |
Sinking of a New Tube Well with Sub Mersible Pump near Shankar Bera1 |
Completion of work |
-
latitude : 22.0460826
Longitude : 87.9649717
file name : Image_22022023144014179.png
|
2023-02-22 14:40:14.288568 |
101 |
49038786 |
Extension of PVC Pipe Line from near Nataraj Mondal's Submercible Pump to Tajpur Samabay Samiti |
24886 |
Extension of PVC Pipe Line from near Nataraj Mondal's Submercible Pump to Tajpur Samabay Samiti1 |
Completion of work |
-
latitude : 22.0311649,22.0311649
Longitude : 87.969117,87.969117
file name : Image_03022023153352415.png
|
2023-02-03 15:33:52.543091 |
102 |
49042675 |
Repairing of Ladies Toilet at GP Office |
50000 |
Repairing of Ladies Toilet at GP Office1 |
Plinth level |
-
latitude : 22.0146616
Longitude : 87.9737667
file name : Image_05092024140505689.png
|
2024-09-05 14:05:05.768792 |
103 |
49042675 |
Repairing of Ladies Toilet at GP Office |
50000 |
Repairing of Ladies Toilet at GP Office1 |
Completion of work |
-
latitude : 22.0146561
Longitude : 87.9737571
file name : Image_05092024135839157.png
|
2024-09-05 13:58:39.261793 |
104 |
57509338 |
Extension of PVC Pipe Line from near Goutam Manna house Submercible Pump to Pintu Manna house |
34536 |
Extension of PVC Pipe Line from near Goutam Manna house Submercible Pump to Pintu Manna house1 |
Completion of work |
-
latitude : 22.0034423,22.0034102
Longitude : 87.9832711,87.9833074
file name : Image_21032023141823053.png
|
2023-03-21 14:18:23.156548 |
105 |
57577183 |
Sinking of a New Tube Well with Sub Mersible Pump near Sk Manirul Islam house and PVC Pipe Line Ex |
177479 |
Sinking of a New Tube Well with Sub Mersible Pump near Sk Manirul Islam house and PVC Pipe Line Ex1 |
Completion of work |
-
latitude : 22.03981876373291
Longitude : 87.95032770372927
file name : Image_23032023145127703.png
|
2023-03-23 14:51:27.818414 |
106 |
49016891 |
Construction of Concrete Ghat at Bangal Para cremation Place |
99960 |
Construction of Concrete Ghat at Bangal Para cremation Place1 |
Completion of work |
-
latitude : 22.0051947562024
Longitude : 87.97909104265273
file name : Image_21032023141415220.png
|
2023-03-21 14:14:15.316822 |
107 |
57510805 |
Extension of PVC Pipe Line from near Nandigram Hospital More Submercible Pump to Sebabrata Bera ho |
21566 |
Extension of PVC Pipe Line from near Nandigram Hospital More Submercible Pump to Sebabrata Bera ho1 |
Completion of work |
-
latitude : 22.0076901,22.0076901
Longitude : 87.9779888,87.9779888
file name : Image_22032023155653753.png
|
2023-03-22 15:56:53.862077 |
108 |
49039697 |
Cost for Repairing of Water Purifier at G.P Office |
40000 |
Cost for Repairing of Water Purifier at G.P Office1 |
Completion of work |
-
latitude : 22.0146352
Longitude : 87.9736807
file name : Image_05092024140623235.png
|
2024-09-05 14:06:23.325211 |
109 |
49017670 |
Construction of Guard Wall from Sukumar Jana |
69522 |
Construction of Guard Wall from Sukumar Jana1 |
Completion of work |
-
latitude : 22.0034311,22.0034311
Longitude : 87.9790182,87.9790182
file name : Image_28032023123940001.png
|
2023-03-28 12:39:40.165131 |
110 |
49020973 |
Construction of Boundary Wall around Nandanayakbar Primary School |
120949 |
Construction of Boundary Wall around Nandanayakbar Primary School1 |
Completion of work |
-
latitude : 22.02493602409959
Longitude : 87.98407743684947
file name : Image_02052023140349164.png
|
2023-05-02 14:03:49.268247 |
111 |
56638738 |
Construction of Tale Pilling with Earth Work at Tuni Khutia Pond |
74750 |
Construction of Tale Pilling with Earth Work at Tuni Khutia Pond1 |
Completion of work |
-
latitude : 22.012596856802702,22.0121199
Longitude : 87.97460370697081,87.9739235
file name : Image_18052023165058050.png
|
2023-05-18 16:50:58.162739 |
112 |
49018605 |
Construction of Concrete road from Manik house to Saharab house |
69529 |
Construction of Concrete road from Manik house to Saharab house1 |
Completion of work |
-
latitude : 22.015278479084373,22.015278479084373
Longitude : 87.97110828571022,87.97110828571022
file name : Image_18042023153151431.png
|
2023-04-18 15:31:51.540715 |
113 |
49018605 |
Construction of Concrete road from Manik house to Saharab house |
69529 |
Construction of Concrete road from Manik house to Saharab house1 |
Completion of work |
-
latitude : 22.015278479084373,22.015278479084373
Longitude : 87.97110828571022,87.97110828571022
file name : Image_18042023153434139.png
|
2023-04-18 15:34:34.255393 |
114 |
49018805 |
Construction of Concrete road from Maleka house to Samsul house |
79526 |
Construction of Concrete road from Maleka house to Samsul house1 |
Completion of work |
-
latitude : 22.0153314108029,22.0153314108029
Longitude : 87.97064987942576,87.97064987942576
file name : Image_18042023153558194.png
|
2023-04-18 15:35:58.306988 |
115 |
56586121 |
Construction of Concrete road from Durga Mondal's house to Biren Middya's house |
199895 |
Construction of Concrete road from Durga Mondal's house to Biren Middya's house1 |
Completion of work |
-
latitude : 22.0226665,22.0226665
Longitude : 87.9663849,87.9663849
file name : Image_18042023154421928.png
|
2023-04-18 15:44:22.031277 |
116 |
46982154 |
Construction of Concrete road with Tale Pilling from Prabodh Khanra's house to Nantu Khanra's house |
218872 |
Construction of Concrete road with Tale Pilling from Prabodh Khanra's house to Nantu Khanra's house 1 |
Completion of work |
-
latitude : 22.02088861260563,22.0208885287866
Longitude : 87.96209304593503,87.9620932135731
file name : Image_18042023155124785.png
|
2023-04-18 15:51:24.883541 |
117 |
56639328 |
Construction of Concrete road with Tale Pilling from Badal Das house to Ramkrishna Gayen house |
149690 |
Construction of Concrete road with Tale Pilling from Badal Das house to Ramkrishna Gayen house1 |
Completion of work |
-
latitude : 22.033190773800015,22.03316877130419
Longitude : 87.95974225737154,87.95972800813615
file name : Image_20042023073508584.png
|
2023-04-20 07:35:08.705235 |
118 |
57522997 |
Sinking of a New Tube Well with Sub Mersible Pump near Tulu Das house |
171137 |
Sinking of a New Tube Well with Sub Mersible Pump near Tulu Das house1 |
Completion of work |
-
latitude : 22.0124395
Longitude : 87.9770107
file name : Image_20042023070450729.png
|
2023-04-20 07:04:50.82876 |
119 |
57517091 |
Convert to Sub mersible from Existing Mark-II Tube Well and PVC Water Tankat Sk Masu's house and Ext |
79391 |
Convert to Sub mersible from Existing Mark-II Tube Well and PVC Water Tankat Sk Masu's house and Ext1 |
Completion of work |
-
latitude : 22.020087302662432
Longitude : 87.9705461114645
file name : Image_18042023154036374.png
|
2023-04-18 15:40:36.478199 |
120 |
56586092 |
Construction of 02(Two) nos Street Light from Sk Aminuddin's house to Sk Harisuddin's house |
103948 |
Construction of 02(Two) nos Street Light from Sk Aminuddin's house to Sk Harisuddin's house1 |
Completion of work |
-
latitude : 22.015670919790864
Longitude : 87.97032139264047
file name : Image_20042023074959025.png
|
2023-04-20 07:49:59.121368 |
121 |
56585928 |
Construction of Concrete road with Tale Pilling from Shibani Ghorai house to Bapi Ghorai house |
149690 |
Construction of Concrete road with Tale Pilling from Shibani Ghorai house to Bapi Ghorai house 1 |
Completion of work |
-
latitude : 22.005112152546644,22.005112152546644
Longitude : 87.9828689340502,87.9828689340502
file name : Image_20042023081922428.png
|
2023-04-20 08:19:22.541933 |
122 |
56639393 |
Construction of Concrete road from Pradip Khanra house to Ranjit Jana house |
99710 |
Construction of Concrete road from Pradip Khanra house to Ranjit Jana house1 |
Completion of work |
-
latitude : 22.034150501713157,22.034150501713157
Longitude : 87.96537045389414,87.96537045389414
file name : Image_18052023170139127.png
|
2023-05-18 17:01:39.221647 |
123 |
49040530 |
Construction of Community Latrnie infront of Battala Masjid |
219412 |
Construction of Community Latrnie infront of Battala Masjid1 |
Plinth level |
-
latitude : 22.021873276680708
Longitude : 87.97546427696943
file name : Image_05122022150703250.png
|
2022-12-05 15:07:03.386539 |
124 |
49040530 |
Construction of Community Latrnie infront of Battala Masjid |
219412 |
Construction of Community Latrnie infront of Battala Masjid1 |
Completion of work |
-
latitude : 22.021804084070027
Longitude : 87.97537811100483
file name : Image_17112022164336585.png
|
2022-11-17 16:43:36.699469 |
125 |
49040100 |
Construction of Concrete Drain from Latib Babus house to Mahasins house |
299185 |
Construction of Concrete Drain from Latib Babus house to Mahasins house1 |
Completion of work |
-
latitude : 22.003965340554714,22.003965340554714
Longitude : 87.9735906701535,87.9735906701535
file name : Image_31122022131754553.png
|
2022-12-31 13:17:54.657801 |
126 |
49040818 |
Construction of Concrete Drain from Prasun Kanti Janas house to Buddhadeb Mondal |
99638 |
Construction of Concrete Drain from Prasun Kanti Janas house to Buddhadeb Mondal1 |
Completion of work |
-
latitude : 22.021110858768225,22.021110858768225
Longitude : 87.96848156489432,87.96848156489432
file name : Image_05012023124406485.png
|
2023-01-05 12:44:06.587878 |
127 |
65995729 |
Construction of toilets in public institutions |
287414 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 22.001828541979194,22.001827284693718
Longitude : 87.9731485247612,87.97314609400928
file name : Image_18012023135208470.png
|
2023-01-18 13:52:08.598314 |
128 |
65995760 |
Construction of Community Sanitary Complex |
171449 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 22.00371354818344,22.00371354818344
Longitude : 87.97350324690342,87.97350324690342
file name : Image_18012023134723491.png
|
2023-01-18 13:47:23.609198 |
129 |
57994171 |
Construction of Concrete Drain from Manikpur Shib Mandir to Manikpur Samabay Samiti |
149521 |
Construction of Concrete Drain from Manikpur Shib Mandir to Manikpur Samabay Samiti 1 |
Completion of work |
-
latitude : 22.0128508284688,22.0128508284688
Longitude : 87.9615887068212,87.9615887068212
file name : Image_21032023143003502.png
|
2023-03-21 14:30:03.607306 |
130 |
58331533 |
Construction of Concrete Drain from Ganesh Khanra's house to Shankari Samanta's house |
124450 |
Construction of Concrete Drain from Ganesh Khanra's house to Shankari Samanta's house1 |
Completion of work |
-
latitude : 22.0132714,22.0132714
Longitude : 87.9748607,87.9748607
file name : Image_21032023144130314.png
|
2023-03-21 14:41:30.421328 |
131 |
49036993 |
Sinking of a New Tube Well with Sub Mersible Pump near Bidhan Mondals house |
171257 |
Sinking of a New Tube Well with Sub Mersible Pump near Bidhan Mondals house1 |
Completion of work |
-
latitude : 22.021958394907415
Longitude : 87.97060411423445
file name : Image_24052023125459771.png
|
2023-05-24 12:54:59.89231 |
132 |
57572774 |
Construction of Concrete Drain from Amal Maity house to Chittaranjan Das Pond |
49530 |
Construction of Concrete Drain from Amal Maity house to Chittaranjan Das Pond1 |
Completion of work |
-
latitude : 22.024889211170375,22.02489583287388
Longitude : 87.98052082769573,87.98043080605567
file name : Image_21032023140334282.png
|
2023-03-21 14:03:34.382941 |
133 |
56639066 |
Construction of Concrete road from Pitch road to Karim Babu house via Serauddin house |
115056 |
Construction of Concrete road from Pitch road to Karim Babu house via Serauddin house1 |
Completion of work |
-
latitude : 22.0086266,22.0086266
Longitude : 87.9686412,87.9686412
file name : Image_24052023150035950.png
|
2023-05-24 15:00:36.066588 |
134 |
65995805 |
Construction of Community Sanitary Complex |
189386 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 22.011280227452517,22.011274695396423
Longitude : 87.97083394601941,87.97084459103644
file name : Image_22022023142409750.png
|
2023-02-22 14:24:09.863822 |
135 |
49041584 |
Construction of Concrete Drain from Saibul Khans Pond to Sub Mercible Pump |
134193 |
Construction of Concrete Drain from Saibul Khans Pond to Sub Mercible Pump1 |
Completion of work |
-
latitude : 22.010069377720356,22.010069377720356
Longitude : 87.96800622716546,87.96800622716546
file name : Image_23022023144921179.png
|
2023-02-23 14:49:21.277764 |
136 |
49018938 |
Construction of Tale Pilling at Saiyad pond |
69529 |
Construction of Tale Pilling at Saiyad pond1 |
Completion of work |
-
latitude : 22.015649587847292,22.015649587847292
Longitude : 87.97114131040871,87.97114131040871
file name : Image_24052023145528474.png
|
2023-05-24 14:55:28.576783 |
137 |
33883432 |
Concrete Drain Imran |
299730 |
Concrete Drain Imran1 |
Plinth level |
-
latitude : 22.0087749,22.0087749,22.009093849919736
Longitude : 87.9624247,87.9624247,87.96735838986933
file name : Image_06072021112021140.png
|
2021-07-06 11:20:21.258445 |
138 |
33883432 |
Concrete Drain Imran |
299730 |
Concrete Drain Imran1 |
Completion of work |
-
latitude : 22.009051688946784,22.009064429439604
Longitude : 87.96741312369704,87.9674135427922
file name : Image_05072021110715437.png
|
2021-07-05 11:07:15.563098 |
139 |
39085693 |
Construction of Concrete Drain from Bablu Mandal |
107800 |
Construction of Concrete Drain from Bablu Mandal1 |
Plinth level |
-
latitude : 22.020977418869734
Longitude : 87.9691131412983
file name : Image_08022022125141651.png
|
2022-02-08 12:51:41.768958 |
140 |
39085693 |
Construction of Concrete Drain from Bablu Mandal |
107800 |
Construction of Concrete Drain from Bablu Mandal1 |
Completion of work |
-
latitude : 22.02085906639695
Longitude : 87.9690521210432
file name : Image_25012022152451726.png
|
2022-01-25 15:24:51.842006 |
141 |
39085727 |
Construction of Culvert near Shankar Maity |
144692 |
Construction of Culvert near Shankar Maity1 |
Plinth level |
-
latitude : 22.0288057,22.0288057
Longitude : 87.9691895,87.9691895
file name : Image_10022022141600293.png
|
2022-02-10 14:16:00.399268 |
142 |
39085727 |
Construction of Culvert near Shankar Maity |
144692 |
Construction of Culvert near Shankar Maity1 |
Completion of work |
-
latitude : 22.0288121,22.0288121
Longitude : 87.9691872,87.9691872
file name : Image_09022022163218851.png
|
2022-02-09 16:32:18.960133 |
143 |
49042291 |
Construction of Concrete Drain from Basudeb Sasmals Land to Satyagopal Sasmal |
94847 |
Construction of Concrete Drain from Basudeb Sasmals Land to Satyagopal Sasmal1 |
Completion of work |
-
latitude : 22.043231204152107,22.043231204152107
Longitude : 87.9536091350019,87.9536091350019
file name : Image_30032023173516179.png
|
2023-03-30 17:35:16.274778 |
144 |
39085730 |
Construction of Concrete Drain from Swadesh Shasmal |
119539 |
Construction of Concrete Drain from Swadesh Shasmal1 |
Plinth level |
-
latitude : 22.041589356958866
Longitude : 87.95226249843836
file name : Image_17022022142139644.png
|
2022-02-17 14:21:39.735284 |
145 |
39085730 |
Construction of Concrete Drain from Swadesh Shasmal |
119539 |
Construction of Concrete Drain from Swadesh Shasmal1 |
Completion of work |
-
latitude : 22.04164010938257
Longitude : 87.95231991447508
file name : Image_13022022135330792.png
|
2022-02-13 13:53:30.917954 |
146 |
39085732 |
Construction of Concrete Drain from Buddhadeb Bijaly |
179450 |
Construction of Concrete Drain from Buddhadeb Bijaly1 |
Plinth level |
-
latitude : 22.039007395505905
Longitude : 87.95246785506606
file name : Image_28022022121128910.png
|
2022-02-28 12:11:28.993158 |
147 |
39085732 |
Construction of Concrete Drain from Buddhadeb Bijaly |
179450 |
Construction of Concrete Drain from Buddhadeb Bijaly1 |
Completion of work |
-
latitude : 22.039097165688872
Longitude : 87.95236391946673
file name : Image_13022022134706074.png
|
2022-02-13 13:47:06.208438 |
148 |
39085705 |
Construction of Concrete Drain from Khokon Maity |
199901 |
Construction of Concrete Drain from Khokon Maity1 |
Completion of work |
-
latitude : 22.01402362436056
Longitude : 87.97449851408601
file name : Image_28022022123840518.png
|
2022-02-28 12:38:40.599943 |
149 |
39085705 |
Construction of Concrete Drain from Khokon Maity |
199901 |
Construction of Concrete Drain from Khokon Maity1 |
Completion of work |
-
latitude : 22.014083680696785
Longitude : 87.97446959652007
file name : Image_18022022170801016.png
|
2022-02-18 17:08:01.103697 |
150 |
49040663 |
Construction of Concrete Drain from Saiyads house to Sk Seidul babu |
49569 |
Construction of Concrete Drain from Saiyads house to Sk Seidul babu1 |
Completion of work |
-
latitude : 22.0154479611665,22.0154479611665
Longitude : 87.97090594656765,87.97090594656765
file name : Image_23022023145742018.png
|
2023-02-23 14:57:42.113592 |
151 |
33924691 |
Repairing of Bridge near parameswar |
79770 |
Repairing of Bridge near parameswar1 |
Plinth level |
-
latitude : 22.0553102,22.042573308572173
Longitude : 87.9608937,87.96328545548022
file name : Image_28032022140042487.png
|
2022-03-28 14:00:42.603459 |
152 |
33924691 |
Repairing of Bridge near parameswar |
79770 |
Repairing of Bridge near parameswar1 |
Completion of work |
-
latitude : 22.04252569936216,22.04252569936216
Longitude : 87.9632912389934,87.9632912389934
file name : Image_26032022154133432.png
|
2022-03-26 15:41:33.566429 |
153 |
57575122 |
Construction of Community Latrine near Manoranjan Ghorai house |
218391 |
Construction of Community Latrine near Manoranjan Ghorai house1 |
Completion of work |
-
latitude : 22.025261661037803
Longitude : 87.96971253119409
file name : Image_29032023142904158.png
|
2023-03-29 14:29:04.28211 |
154 |
49041441 |
Construction of Concrete Drain from Sk Laltus house to Kalams house |
174619 |
Construction of Concrete Drain from Sk Laltus house to Kalams house1 |
Completion of work |
-
latitude : 22.0101887,22.0101887
Longitude : 87.9700189,87.9700189
file name : Image_29032023143321265.png
|
2023-03-29 14:33:21.345162 |
155 |
39085698 |
Construction of Concrete Drain from Harekrishna Ballav |
199201 |
Construction of Concrete Drain from Harekrishna Ballav1 |
Completion of work |
-
latitude : 22.0129603
Longitude : 87.9749271
file name : Image_08022022150639450.png
|
2022-02-08 15:06:39.533027 |
156 |
39085678 |
Construction of Concrete Drain from Sk Imran |
69372 |
Construction of Concrete Drain from Sk Imran1 |
Plinth level |
-
latitude : 22.016482204198837
Longitude : 87.97109219245613
file name : Image_26032022145450714.png
|
2022-03-26 14:54:50.836794 |
157 |
39085678 |
Construction of Concrete Drain from Sk Imran |
69372 |
Construction of Concrete Drain from Sk Imran1 |
Completion of work |
-
latitude : 22.01640446204692
Longitude : 87.97100367955863
file name : Image_25032022164630328.png
|
2022-03-25 16:46:30.446957 |
158 |
39085721 |
Construction of Concrete Drain from Transformer to Paltu |
249850 |
Construction of Concrete Drain from Transformer to Paltu1 |
Plinth level |
-
latitude : 22.012954470701516
Longitude : 87.96156456694007
file name : Image_27032022125051050.png
|
2022-03-27 12:50:51.195171 |
159 |
39085721 |
Construction of Concrete Drain from Transformer to Paltu |
249850 |
Construction of Concrete Drain from Transformer to Paltu1 |
Completion of work |
-
latitude : 22.012928067706525
Longitude : 87.96159499324858
file name : Image_26032022151259421.png
|
2022-03-26 15:12:59.652685 |
160 |
39085656 |
Construction of Concrete Drain from Basudeb |
149894 |
Construction of Concrete Drain from Basudeb 1 |
Plinth level |
-
latitude : 22.0080274
Longitude : 87.9775898
file name : Image_30032022171444149.png
|
2022-03-30 17:14:44.247361 |
161 |
39085656 |
Construction of Concrete Drain from Basudeb |
149894 |
Construction of Concrete Drain from Basudeb 1 |
Completion of work |
-
latitude : 22.0081073
Longitude : 87.977103
file name : Image_27032022112500269.png
|
2022-03-27 11:25:00.420826 |
162 |
57573308 |
Construction of Concrete Drain from Sk Maktab house to Rajesh Ali Khan house |
149251 |
Construction of Concrete Drain from Sk Maktab house to Rajesh Ali Khan house1 |
Completion of work |
-
latitude : 22.0139808,22.0139808
Longitude : 87.9632333,87.9632333
file name : Image_19042023134918925.png
|
2023-04-19 13:49:19.025481 |
163 |
49040262 |
Construction of Concrete Drain from Sk Habiburs house to Rejjak Khans house |
98917 |
Construction of Concrete Drain from Sk Habiburs house to Rejjak Khans house1 |
Completion of work |
-
latitude : 22.00377050321549,22.00377050321549
Longitude : 87.96851081773639,87.96851081773639
file name : Image_20042023080507859.png
|
2023-04-20 08:05:07.967917 |
164 |
57578942 |
Construction of Culvert near Rajibul Mallik house |
118703 |
Construction of Culvert near Rajibul Mallik house1 |
Completion of work |
-
latitude : 22.04475251957774
Longitude : 87.94873237609863
file name : Image_20042023072239641.png
|
2023-04-20 07:22:39.736075 |
165 |
46982343 |
Construction of Concrete road from Buddhadeb Samanta's house to Haripur Farm at Nandigram-X Sansad u |
99468 |
Construction of Concrete road from Buddhadeb Samanta's house to Haripur Farm at Nandigram-X Sansad u1 |
Completion of work |
-
latitude : 22.028867807239294,22.028867807239294
Longitude : 87.96002179384232,87.96002179384232
file name : Image_23052023133111186.png
|
2023-05-23 13:31:11.294366 |
166 |
57511266 |
Sinking of a New Tube Well with Sub Mersible Pump near Sk Mostapha Babu house |
170623 |
Sinking of a New Tube Well with Sub Mersible Pump near Sk Mostapha Babu house1 |
Completion of work |
-
latitude : 22.001720666885376
Longitude : 87.97246372327209
file name : Image_24052023124419709.png
|
2023-05-24 12:44:19.80343 |
167 |
69801034 |
Construction of roads |
139458 |
Construction of roads1 |
Roof laid |
-
latitude : 22.03304979018867,22.03304979018867
Longitude : 87.95944025740027,87.95944025740027
file name : Image_23072024132706667.png
|
2024-07-23 13:27:06.763013 |
168 |
69801034 |
Construction of roads |
139458 |
Construction of roads1 |
Roof laid |
-
latitude : 22.03316696919501,22.033172543160617
Longitude : 87.9592629801482,87.95927270315588
file name : Image_29122023123801012.png
|
2023-12-29 12:38:01.093562 |
169 |
69801034 |
Construction of roads |
139458 |
Construction of roads1 |
Plinth level |
-
latitude : 22.033135620877147,22.033135620877147
Longitude : 87.95919600874186,87.95919600874186
file name : Image_29122023123206662.png
|
2023-12-29 12:32:06.749379 |
170 |
69801034 |
Construction of roads |
139458 |
Construction of roads1 |
Completion of work |
-
latitude : 22.03325497917831,22.03325497917831
Longitude : 87.95922618359327,87.95922618359327
file name : Image_28122023142557793.png
|
2023-12-28 14:25:57.886323 |
171 |
69841827 |
Electricity connection /Installation of Solar Energy |
104000 |
Electricity connection /Installation of Solar Energy1 |
Roof laid |
-
latitude : 22.01005718205124
Longitude : 87.9754575714469
file name : Image_23072024130643664.png
|
2024-07-23 13:06:43.764726 |
172 |
69841827 |
Electricity connection /Installation of Solar Energy |
104000 |
Electricity connection /Installation of Solar Energy1 |
Roof laid |
-
latitude : 22.009908
Longitude : 87.97526
file name : Image_23072024130518643.png
|
2024-07-23 13:05:18.740863 |
173 |
69841827 |
Electricity connection /Installation of Solar Energy |
104000 |
Electricity connection /Installation of Solar Energy1 |
Roof laid |
-
latitude : 22.0102466
Longitude : 87.9752552
file name : Image_29122023133001459.png
|
2023-12-29 13:30:01.551002 |
174 |
69841827 |
Electricity connection /Installation of Solar Energy |
104000 |
Electricity connection /Installation of Solar Energy1 |
Plinth level |
-
latitude : 22.0102438
Longitude : 87.9752553
file name : Image_29122023132411756.png
|
2023-12-29 13:24:11.846678 |
175 |
69841827 |
Electricity connection /Installation of Solar Energy |
104000 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 22.0104777
Longitude : 87.9757438
file name : Image_28122023145351776.png
|
2023-12-28 14:53:51.874513 |
176 |
69841827 |
Electricity connection /Installation of Solar Energy |
104000 |
Electricity connection /Installation of Solar Energy2 |
Roof laid |
-
latitude : 22.0102447
Longitude : 87.9752098
file name : Image_23072024130737739.png
|
2024-07-23 13:07:37.835659 |
177 |
69841827 |
Electricity connection /Installation of Solar Energy |
104000 |
Electricity connection /Installation of Solar Energy2 |
Plinth level |
-
latitude : 22.0102489
Longitude : 87.9752544
file name : Image_29122023132509530.png
|
2023-12-29 13:25:09.62227 |
178 |
69841827 |
Electricity connection /Installation of Solar Energy |
104000 |
Electricity connection /Installation of Solar Energy2 |
Completion of work |
-
latitude : 22.0104873
Longitude : 87.9757119
file name : Image_28122023145446728.png
|
2023-12-28 14:54:46.835958 |
179 |
49020095 |
Construction of First Floor infront of Nandigram GP Office |
248500 |
Construction of First Floor infront of Nandigram GP Office1 |
Completion of work |
-
latitude : 22.0147131
Longitude : 87.9736315
file name : Image_29122023145910277.png
|
2023-12-29 14:59:10.36127 |
180 |
49019203 |
Erection of 2 nos Street Light from Battala Masjid to Dukha Khan house |
105000 |
Erection of 2 nos Street Light from Battala Masjid to Dukha Khan house1 |
Completion of work |
-
latitude : 22.016360834240913
Longitude : 87.9704475402832
file name : Image_21072023133449002.png
|
2023-07-21 13:34:49.097406 |
181 |
49019203 |
Erection of 2 nos Street Light from Battala Masjid to Dukha Khan house |
105000 |
Erection of 2 nos Street Light from Battala Masjid to Dukha Khan house2 |
Completion of work |
-
latitude : 22.01629390474409
Longitude : 87.97038576565683
file name : Image_21072023133549273.png
|
2023-07-21 13:35:49.369993 |
182 |
49040399 |
Construction of Concrete Drain from Mobarak Babus house to Abu Babus house |
180000 |
Construction of Concrete Drain from Mobarak Babus house to Abu Babus house 1 |
Completion of work |
-
latitude : 22.01396122109145,22.01396122109145
Longitude : 87.97199450433254,87.97199450433254
file name : Image_01082023143132104.png
|
2023-08-01 14:31:32.21908 |
183 |
33925271 |
Renumaration of Water Testing and Water Facillator Nandigram G.P |
50000 |
Renumaration of Water Testing and Water Facillator Nandigram G.P 1 |
Completion of work |
-
latitude : 22.0147339
Longitude : 87.9736611
file name : Image_28072023124233650.png
|
2023-07-28 12:42:33.743213 |
184 |
57522300 |
Sinking of a New Tube Well with Sub Mersible Pump near Sk Tahid house |
172000 |
Sinking of a New Tube Well with Sub Mersible Pump near Sk Tahid house1 |
Completion of work |
-
latitude : 22.01613737270236
Longitude : 87.97342806123197
file name : Image_01082023142002236.png
|
2023-08-01 14:20:02.33829 |
185 |
57574543 |
SinkinSg of a New Tube Well with Sub Mersible Pump and PVC Pipe Line Extension near Gadaibalbar Utta |
200000 |
SinkinSg of a New Tube Well with Sub Mersible Pump and PVC Pipe Line Extension near Gadaibalbar Utta1 |
Completion of work |
-
latitude : 22.0139854
Longitude : 87.9705281
file name : Image_10112023144819419.png
|
2023-11-10 14:48:21.79462 |
186 |
57578441 |
Construction of Concrete Drain from Murari Mohan Manna Land to Buddhabeb Bijaly house |
99950 |
Construction of Concrete Drain from Murari Mohan Manna Land to Buddhabeb Bijaly house1 |
Completion of work |
-
latitude : 22.03920068219304,22.03920068219304
Longitude : 87.95249300077558,87.95249300077558
file name : Image_16012024142047290.png
|
2024-01-16 14:20:47.383413 |
187 |
57572239 |
Extension of PVC Pipe Line from near Tarun Sangha Club Submercible Pump to Satyaranjan Jana house |
40000 |
Extension of PVC Pipe Line from near Tarun Sangha Club Submercible Pump to Satyaranjan Jana house1 |
Completion of work |
-
latitude : 22.024982920847833,22.024982920847833
Longitude : 87.98373771831393,87.98373771831393
file name : Image_16012024135455043.png
|
2024-01-16 13:54:55.137284 |
188 |
57515477 |
Extension of PVC Pipe Line from near Sk Habibur Rahaman house Submercible Pump to Rafikul house' |
30000 |
Extension of PVC Pipe Line from near Sk Habibur Rahaman house Submercible Pump to Rafikul house'1 |
Completion of work |
-
latitude : 22.0087879,22.0087327
Longitude : 87.9710285,87.9709954
file name : Image_16012024150425534.png
|
2024-01-16 15:04:25.622627 |
189 |
57570838 |
Extension of PVC Pipe Line from near Sk Ummed' house Sub Mersible Pump to Masjid |
20000 |
Extension of PVC Pipe Line from near Sk Ummed' house Sub Mersible Pump to Masjid 1 |
Completion of work |
-
latitude : 22.02100185211748,22.02100185211748
Longitude : 87.9753833077848,87.9753833077848
file name : Image_16012024134605035.png
|
2024-01-16 13:46:05.119798 |
190 |
69790407 |
Construction of roads |
135000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.024934934452176,22.024934934452176
Longitude : 87.98380737192929,87.98380737192929
file name : Image_17012024160054274.png
|
2024-01-17 16:00:54.370251 |
191 |
69790407 |
Construction of roads |
135000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.024636454880238,22.02465556561947
Longitude : 87.98361911438406,87.98360981047153
file name : Image_16012024135556054.png
|
2024-01-16 13:55:56.136525 |
192 |
87646266 |
Construction of Tale Pilling at Sk Banu Sk Fajle, Sk Saibul and others |
290000 |
Construction of Tale Pilling at Sk Banu Sk Fajle, Sk Saibul and others1 |
Plinth level |
-
latitude : 22.004718454554677,22.004718454554677
Longitude : 87.97366367653012,87.97366367653012
file name : Image_09022024172932325.png
|
2024-02-09 17:29:32.416977 |
193 |
87646266 |
Construction of Tale Pilling at Sk Banu Sk Fajle, Sk Saibul and others |
290000 |
Construction of Tale Pilling at Sk Banu Sk Fajle, Sk Saibul and others1 |
Completion of work |
-
latitude : 22.004533633589745,22.004533633589745
Longitude : 87.97369938343763,87.97369938343763
file name : Image_08022024140128008.png
|
2024-02-08 14:01:28.121351 |
194 |
70184827 |
Creation of drainage channel for management of grey water |
119261 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.04050159547478
Longitude : 87.9503660928458
file name : Image_31012024111131641.png
|
2024-01-31 11:11:31.752374 |
195 |
70184827 |
Creation of drainage channel for management of grey water |
119261 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.040576823055744
Longitude : 87.95073280110955
file name : Image_16012024141554867.png
|
2024-01-16 14:15:54.959333 |
196 |
70049015 |
Creation of a new source of drinking water |
171222 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.025508801452816
Longitude : 87.974683502689
file name : Image_17012024155402612.png
|
2024-01-17 15:54:02.718422 |
197 |
70049015 |
Creation of a new source of drinking water |
171222 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.0254733460024
Longitude : 87.97458551824093
file name : Image_16012024135008776.png
|
2024-01-16 13:50:08.884467 |
198 |
70190709 |
Greywater management system |
274418 |
Greywater management system1 |
Plinth level |
-
latitude : 22.03186
Longitude : 87.969138
file name : Image_30012024170957448.png
|
2024-01-30 17:09:57.622484 |
199 |
70190709 |
Greywater management system |
274418 |
Greywater management system1 |
Completion of work |
-
latitude : 22.031887848861516
Longitude : 87.96882765367627
file name : Image_16012024140739446.png
|
2024-01-16 14:07:39.537667 |
200 |
70049280 |
Creation of a new source of drinking water |
179231 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.023153151385486
Longitude : 87.96232162043452
file name : Image_25012024121938995.png
|
2024-01-25 12:19:39.093331 |
201 |
70049280 |
Creation of a new source of drinking water |
179231 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.023162371478975
Longitude : 87.96240694820881
file name : Image_17012024154112873.png
|
2024-01-17 15:41:12.9762 |
202 |
89554384 |
Construction of Community Sanitary Complex |
80000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 22.008005040697753
Longitude : 87.97837271355093
file name : Image_16012024151304260.png
|
2024-01-16 15:13:04.354633 |
203 |
39085647 |
Devlopment of G.P Meeting Hall |
150000 |
Devlopment of G.P Meeting Hall 1 |
Completion of work |
-
latitude : 22.0147373
Longitude : 87.973748
file name : Image_25012024180141390.png
|
2024-01-25 18:01:41.497714 |
204 |
69824623 |
Construction of Store Room in GP Bhawan |
150000 |
Construction of Store Room in GP Bhawan1 |
Plinth level |
-
latitude : 22.0147862
Longitude : 87.9736942
file name : Image_25012024155737526.png
|
2024-01-25 15:57:37.608378 |
205 |
69824623 |
Construction of Store Room in GP Bhawan |
150000 |
Construction of Store Room in GP Bhawan1 |
Completion of work |
-
latitude : 22.0147667
Longitude : 87.9736877
file name : Image_25012024155346000.png
|
2024-01-25 15:53:46.075891 |
206 |
56638846 |
Construction of Second Floor of Office Building infront of Nandigram G.P. Office |
250000 |
Construction of Second Floor of Office Building infront of Nandigram G.P. Office1 |
Completion of work |
-
latitude : 22.0147281
Longitude : 87.973737
file name : Image_17012024151903280.png
|
2024-01-17 15:19:03.407473 |
207 |
87648341 |
Creation of a new source of drinking water |
171308 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.0113292
Longitude : 87.9739028
file name : Image_23112023142121846.png
|
2023-11-23 14:21:21.946196 |
208 |
87648341 |
Creation of a new source of drinking water |
171308 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.0115183
Longitude : 87.9738015
file name : Image_23112023142349381.png
|
2023-11-23 14:23:49.475543 |
209 |
87648386 |
Creation of a new source of drinking water |
175000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.0368311
Longitude : 87.9660793
file name : Image_23112023145111741.png
|
2023-11-23 14:51:11.830284 |
210 |
87648256 |
Copnstruction of Concrete road with Tale Pilling from Sk Abu Hossain house to Sk Tabarak house |
70000 |
Copnstruction of Concrete road with Tale Pilling from Sk Abu Hossain house to Sk Tabarak house1 |
Completion of work |
-
latitude : 22.01511884573847,22.015130664221942
Longitude : 87.96992006711662,87.96997245401144
file name : Image_23112023144455037.png
|
2023-11-23 14:44:55.142341 |
211 |
70049739 |
Water Supply to villages |
20000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.041016244329512,22.041016244329512
Longitude : 87.9531741142273,87.9531741142273
file name : Image_13022024161834761.png
|
2024-02-13 16:18:34.847508 |
212 |
70049739 |
Water Supply to villages |
20000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.040630467236042,22.040630467236042
Longitude : 87.95322423800826,87.95322423800826
file name : Image_08022024150637802.png
|
2024-02-08 15:06:37.905459 |
213 |
69867660 |
Water Supply to villages |
171308 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.00474158860743
Longitude : 87.97369192354381
file name : Image_09022024172630727.png
|
2024-02-09 17:26:30.828453 |
214 |
69867660 |
Water Supply to villages |
171308 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.004664768464863
Longitude : 87.97376836650074
file name : Image_08022024135906887.png
|
2024-02-08 13:59:06.98036 |
215 |
70179800 |
Creation of drainage channel for management of grey water |
190000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.014018427580595
Longitude : 87.97534290701151
file name : Image_12022024152228382.png
|
2024-02-12 15:22:28.479083 |
216 |
70179800 |
Creation of drainage channel for management of grey water |
190000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.01405036263168
Longitude : 87.97534408047795
file name : Image_12022024151556342.png
|
2024-02-12 15:15:56.441455 |
217 |
70179800 |
Creation of drainage channel for management of grey water |
190000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.014264352619648
Longitude : 87.97509002499282
file name : Image_09022024171406184.png
|
2024-02-09 17:14:06.285054 |
218 |
70049446 |
Water Supply to villages |
35000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.0307273324579,22.0307273324579
Longitude : 87.95185983181,87.95185983181
file name : Image_13022024161258197.png
|
2024-02-13 16:12:58.279955 |
219 |
70049446 |
Water Supply to villages |
35000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.03071002382785,22.030670503154397
Longitude : 87.95183787122369,87.95182353816926
file name : Image_08022024150001737.png
|
2024-02-08 15:00:01.826298 |
220 |
87648503 |
Creation of drainage channel for management of grey water |
272000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.0112479
Longitude : 87.9717337
file name : Image_09022024174544678.png
|
2024-02-09 17:45:44.763469 |
221 |
87648503 |
Creation of drainage channel for management of grey water |
272000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.011414128355682
Longitude : 87.97228921204805
file name : Image_08022024141904904.png
|
2024-02-08 14:19:05.002582 |
222 |
69869391 |
Water Supply to villages |
171308 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.000947394408286
Longitude : 87.97135563567281
file name : Image_09022024173439088.png
|
2024-02-09 17:34:39.269977 |
223 |
69869391 |
Water Supply to villages |
171308 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.000969774089754
Longitude : 87.97147683799267
file name : Image_08022024140750433.png
|
2024-02-08 14:07:50.542657 |
224 |
69812647 |
Construction of roads |
50000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.03937561251223,22.03937561251223
Longitude : 87.96147630549967,87.96147630549967
file name : Image_04072024141908689.png
|
2024-07-04 14:19:09.040563 |
225 |
69812647 |
Construction of roads |
50000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.039361530914903,22.039361530914903
Longitude : 87.96125644817948,87.96125644817948
file name : Image_04072024141323060.png
|
2024-07-04 14:13:23.161392 |
226 |
70171892 |
Creation of drainage channel for management of grey water |
179410 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.001045211218297
Longitude : 87.97104944474995
file name : Image_24022024102706212.png
|
2024-02-24 10:27:06.302799 |
227 |
70171892 |
Creation of drainage channel for management of grey water |
179410 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.001068638637662
Longitude : 87.97108037397265
file name : Image_20022024131744037.png
|
2024-02-20 13:17:44.147943 |
228 |
70175877 |
Creation of drainage channel for management of grey water |
30000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.01535165309906
Longitude : 87.97115706838667
file name : Image_15032024164932108.png
|
2024-03-15 16:49:32.205705 |
229 |
70175877 |
Creation of drainage channel for management of grey water |
30000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.015404207631946
Longitude : 87.97108079306781
file name : Image_24022024111153162.png
|
2024-02-24 11:11:53.242637 |
230 |
69811616 |
Construction of roads |
50000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.038368568755686,22.038368568755686
Longitude : 87.96081991866231,87.96081991866231
file name : Image_04072024142405319.png
|
2024-07-04 14:24:05.427456 |
231 |
69811616 |
Construction of roads |
50000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.038501841016114,22.038501841016114
Longitude : 87.96071380376816,87.96071380376816
file name : Image_04072024142105676.png
|
2024-07-04 14:21:05.784937 |
232 |
70186106 |
Creation of Silt Oil & Grease chamber for pre-treatment of grey water |
60000 |
Creation of Silt Oil & Grease chamber for pre-treatment of grey water1 |
Plinth level |
-
latitude : 22.040172605775297
Longitude : 87.9529111739248
file name : Image_20022024142726845.png
|
2024-02-20 14:27:26.942616 |
233 |
70186106 |
Creation of Silt Oil & Grease chamber for pre-treatment of grey water |
60000 |
Creation of Silt Oil & Grease chamber for pre-treatment of grey water1 |
Completion of work |
-
latitude : 22.04018237069249
Longitude : 87.95297269709408
file name : Image_17022024153204066.png
|
2024-02-17 15:32:04.172387 |
234 |
70157857 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.00988811906427
Longitude : 87.98109473660588
file name : Image_20022024134659092.png
|
2024-02-20 13:46:59.178295 |
235 |
70157857 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.009829906746745
Longitude : 87.98115223646164
file name : Image_20022024133525634.png
|
2024-02-20 13:35:25.757929 |
236 |
69877079 |
Creation of a new source of drinking water |
171308 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.020842763595283
Longitude : 87.97935792244971
file name : Image_24022024143426841.png
|
2024-02-24 14:34:26.930625 |
237 |
69877079 |
Creation of a new source of drinking water |
171308 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.020816109143198
Longitude : 87.97947200015187
file name : Image_24022024142833882.png
|
2024-02-24 14:28:34.08167 |
238 |
69815586 |
Construction of roads |
139750 |
Construction of roads1 |
Plinth level |
-
latitude : 22.0169611,22.0169611
Longitude : 87.9730295,87.9730295
file name : Image_24022024135843384.png
|
2024-02-24 13:58:43.48072 |
239 |
69815586 |
Construction of roads |
139750 |
Construction of roads1 |
Completion of work |
-
latitude : 22.044507558457553,22.044507558457553
Longitude : 87.9487875290215,87.9487875290215
file name : Image_23022024173218776.png
|
2024-02-23 17:32:19.072613 |
240 |
70180898 |
Creation of drainage channel for management of grey water |
125000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.02491112984717
Longitude : 87.98378750681877
file name : Image_08042024124646769.png
|
2024-04-08 12:46:46.88157 |
241 |
70180898 |
Creation of drainage channel for management of grey water |
125000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.024900862015784
Longitude : 87.98401867970824
file name : Image_20022024135420576.png
|
2024-02-20 13:54:20.661844 |
242 |
70048935 |
Water Supply to villages |
29900 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.0097065,22.0097065
Longitude : 87.9731287,87.9731287
file name : Image_20022024124914053.png
|
2024-02-20 12:49:14.162413 |
243 |
70048935 |
Water Supply to villages |
29900 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.0097068,22.0097068,22.0097069,22.0097069
Longitude : 87.9731283,87.9731283,87.9731277,87.9731277
file name : Image_20022024124501882.png
|
2024-02-20 12:45:01.986086 |
244 |
69872261 |
Water Supply to villages |
179696 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.00805918779224
Longitude : 87.97055038623512
file name : Image_21022024145258852.png
|
2024-02-21 14:52:58.952099 |
245 |
69872261 |
Water Supply to villages |
179696 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.008171756751835
Longitude : 87.97052121721208
file name : Image_21022024140249570.png
|
2024-02-21 14:02:49.680181 |
246 |
67781018 |
Construction of roads |
69430 |
Construction of roads1 |
Plinth level |
-
latitude : 22.0113141,22.0113141
Longitude : 87.9717169,87.9717169
file name : Image_21022024115259248.png
|
2024-02-21 11:52:59.353379 |
247 |
67781018 |
Construction of roads |
69430 |
Construction of roads1 |
Completion of work |
-
latitude : 22.0113167,22.0113167
Longitude : 87.9717203,87.9717203
file name : Image_21022024113632716.png
|
2024-02-21 11:36:32.787175 |
248 |
70049094 |
Creation of a new source of drinking water |
171222 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.011692826636136
Longitude : 87.96832113526762
file name : Image_15032024162733725.png
|
2024-03-15 16:27:33.82446 |
249 |
70049094 |
Creation of a new source of drinking water |
171222 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.011722498573363
Longitude : 87.96835022047162
file name : Image_15032024163244320.png
|
2024-03-15 16:32:44.43122 |
250 |
70049094 |
Creation of a new source of drinking water |
171222 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.011692826636136
Longitude : 87.96832113526762
file name : Image_15032024162711667.png
|
2024-03-15 16:27:11.768408 |
251 |
69865299 |
Water Supply to villages |
25980 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.00650828424841,22.00650828424841
Longitude : 87.98277497291565,87.98277497291565
file name : Image_20022024130616283.png
|
2024-02-20 13:06:16.384496 |
252 |
69865299 |
Water Supply to villages |
25980 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.00659792870283,22.00659792870283
Longitude : 87.98304378055036,87.98304378055036
file name : Image_20022024130016039.png
|
2024-02-20 13:00:16.213781 |
253 |
69780474 |
Construction of roads |
69480 |
Construction of roads1 |
Plinth level |
-
latitude : 22.01651648618281,22.01651648618281
Longitude : 87.97132009640336,87.97132009640336
file name : Image_17022024104841713.png
|
2024-02-17 10:48:41.807464 |
254 |
69780474 |
Construction of roads |
69480 |
Construction of roads1 |
Completion of work |
-
latitude : 22.01638807542622,22.01638807542622
Longitude : 87.97126058489084,87.97126058489084
file name : Image_17022024103642149.png
|
2024-02-17 10:36:42.256879 |
255 |
67781121 |
Construction of roads |
79500 |
Construction of roads1 |
Plinth level |
-
latitude : 22.008054996840656,22.008054996840656
Longitude : 87.97100870870054,87.97100870870054
file name : Image_15032024164340058.png
|
2024-03-15 16:43:40.160327 |
256 |
67781121 |
Construction of roads |
79500 |
Construction of roads1 |
Completion of work |
-
latitude : 22.008056798949838,22.008071090094745
Longitude : 87.97100150026381,87.9710056912154
file name : Image_15032024164009651.png
|
2024-03-15 16:40:09.750725 |
257 |
57575629 |
Construction of Concrete Drain from Tapan Das house to Bhanu Charan Das house |
134959 |
Construction of Concrete Drain from Tapan Das house to Bhanu Charan Das house1 |
Plinth level |
-
latitude : 22.0349058,22.0349058
Longitude : 87.9631582,87.9631582
file name : Image_24022024141701890.png
|
2024-02-24 14:17:01.985648 |
258 |
57575629 |
Construction of Concrete Drain from Tapan Das house to Bhanu Charan Das house |
134959 |
Construction of Concrete Drain from Tapan Das house to Bhanu Charan Das house1 |
Completion of work |
-
latitude : 22.0349074,22.0349048
Longitude : 87.9631666,87.9631586
file name : Image_24022024141246406.png
|
2024-02-24 14:12:46.497933 |
259 |
70178595 |
Creation of drainage channel for management of grey water |
139472 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.0138705
Longitude : 87.9737342
file name : Image_27022024164622271.png
|
2024-02-27 16:46:22.359856 |
260 |
70178595 |
Creation of drainage channel for management of grey water |
139472 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.0147109
Longitude : 87.9737678
file name : Image_14032024163013229.png
|
2024-03-14 16:30:13.324939 |
261 |
70178595 |
Creation of drainage channel for management of grey water |
139472 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.0138705
Longitude : 87.9737342
file name : Image_27022024164334723.png
|
2024-02-27 16:43:34.852043 |
262 |
69889084 |
Water Supply to villages |
27990 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.008659499697387,22.008659499697387
Longitude : 87.97564943321049,87.97564943321049
file name : Image_27022024152717357.png
|
2024-02-27 15:27:17.461253 |
263 |
69889084 |
Water Supply to villages |
27990 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.008716957643628,22.00871096458286
Longitude : 87.97569829970598,87.97568455338478
file name : Image_27022024152149267.png
|
2024-02-27 15:21:49.386361 |
264 |
69889084 |
Water Supply to villages |
27990 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.008724878542125,22.008647471666336
Longitude : 87.97566946595907,87.9757091961801
file name : Image_27022024152121528.png
|
2024-02-27 15:21:21.626805 |
265 |
69889084 |
Water Supply to villages |
27990 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.0105031,22.0104994
Longitude : 87.9740527,87.9741181
file name : Image_17022024111013247.png
|
2024-02-17 11:10:13.359658 |
266 |
70177026 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.02278858050704
Longitude : 87.96884944662452
file name : Image_27022024164944080.png
|
2024-02-27 16:49:44.790056 |
267 |
70177026 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.02294268179685
Longitude : 87.96898104250431
file name : Image_17022024145354082.png
|
2024-02-17 14:53:54.18952 |
268 |
69883768 |
Water Supply to villages |
29980 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.008551289327443,22.008551289327443
Longitude : 87.97551347874105,87.97551347874105
file name : Image_27022024164616512.png
|
2024-02-27 16:46:16.595268 |
269 |
69883768 |
Water Supply to villages |
29980 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.008642819710076,22.008642819710076
Longitude : 87.97557374462485,87.97557374462485
file name : Image_27022024153127722.png
|
2024-02-27 15:31:27.828742 |
270 |
69883768 |
Water Supply to villages |
29980 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.008635150268674,22.008635150268674
Longitude : 87.97558698803186,87.97558698803186
file name : Image_27022024152839423.png
|
2024-02-27 15:28:39.50567 |
271 |
69827089 |
Construction of Building |
275000 |
Construction of Building1 |
Plinth level |
-
latitude : 22.0147321
Longitude : 87.9737681
file name : Image_15032024130118547.png
|
2024-03-15 13:01:18.643516 |
272 |
69827089 |
Construction of Building |
275000 |
Construction of Building1 |
Completion of work |
-
latitude : 22.0147363
Longitude : 87.9737946
file name : Image_15032024125233923.png
|
2024-03-15 12:52:34.046628 |
273 |
69802077 |
Construction of roads |
149700 |
Construction of roads1 |
Plinth level |
-
latitude : 22.03211927320808,22.03211927320808
Longitude : 87.96066485345364,87.96066485345364
file name : Image_15032024173124456.png
|
2024-03-15 17:31:24.547281 |
274 |
69802077 |
Construction of roads |
149700 |
Construction of roads1 |
Completion of work |
-
latitude : 22.032093415036798,22.032093415036798
Longitude : 87.9606272187084,87.9606272187084
file name : Image_15032024172733769.png
|
2024-03-15 17:27:33.858447 |
275 |
57576022 |
Construction of Concrete Drain at Tajpur Madhya Pally Shitala Mandir Premisses |
99950 |
Construction of Concrete Drain at Tajpur Madhya Pally Shitala Mandir Premisses1 |
Plinth level |
-
latitude : 22.035399,22.035399
Longitude : 87.9627288,87.9627288
file name : Image_16032024120254288.png
|
2024-03-16 12:02:54.386696 |
276 |
57576022 |
Construction of Concrete Drain at Tajpur Madhya Pally Shitala Mandir Premisses |
99950 |
Construction of Concrete Drain at Tajpur Madhya Pally Shitala Mandir Premisses1 |
Completion of work |
-
latitude : 22.0351206,22.0351206
Longitude : 87.9629749,87.9629749
file name : Image_16032024115719140.png
|
2024-03-16 11:57:19.23698 |
277 |
69849993 |
Construction of roads |
49480 |
Construction of roads1 |
Plinth level |
-
latitude : 22.011172561906278,22.011172561906278
Longitude : 87.96888607554138,87.96888607554138
file name : Image_15032024161817078.png
|
2024-03-15 16:18:17.189043 |
278 |
69849993 |
Construction of roads |
49480 |
Construction of roads1 |
Completion of work |
-
latitude : 22.0136313,22.0136313
Longitude : 87.963264,87.963264
file name : Image_15032024161216460.png
|
2024-03-15 16:12:16.565634 |
279 |
69783918 |
Construction of roads |
164918 |
Construction of roads1 |
Plinth level |
-
latitude : 22.02418701723218,22.02418701723218
Longitude : 87.97014721669257,87.97014721669257
file name : Image_15032024170326667.png
|
2024-03-15 17:03:26.770277 |
280 |
69783918 |
Construction of roads |
164918 |
Construction of roads1 |
Completion of work |
-
latitude : 22.024195650592446,22.024195650592446
Longitude : 87.97010430134833,87.97010430134833
file name : Image_15032024165757315.png
|
2024-03-15 16:57:57.416324 |
281 |
69849286 |
Construction of roads |
49500 |
Construction of roads1 |
Plinth level |
-
latitude : 22.01128068845719,22.011166694574058
Longitude : 87.96867359429598,87.96873402781785
file name : Image_15032024163353405.png
|
2024-03-15 16:33:53.511693 |
282 |
69849286 |
Construction of roads |
49500 |
Construction of roads1 |
Completion of work |
-
latitude : 22.011096035130322,22.011096035130322
Longitude : 87.96878255903721,87.96878255903721
file name : Image_15032024162652774.png
|
2024-03-15 16:26:52.87246 |
283 |
70188539 |
Creation of drainage channel for management of grey water |
149201 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.044506133534014
Longitude : 87.94320342130959
file name : Image_15032024171522355.png
|
2024-03-15 17:15:22.455038 |
284 |
70188539 |
Creation of drainage channel for management of grey water |
149201 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.04452155623585
Longitude : 87.94318179599941
file name : Image_20022024141832711.png
|
2024-02-20 14:18:32.806356 |
285 |
69799228 |
Construction of roads |
174500 |
Construction of roads1 |
Plinth level |
-
latitude : 22.02122665476054,22.02122665476054
Longitude : 87.96245489269495,87.96245489269495
file name : Image_29062024135453595.png
|
2024-06-29 13:54:53.684718 |
286 |
69799228 |
Construction of roads |
174500 |
Construction of roads1 |
Completion of work |
-
latitude : 22.0274119,22.0274119,22.0211993297562
Longitude : 87.9636495,87.9636495,87.96226311475039
file name : Image_29062024134804309.png
|
2024-06-29 13:48:04.408155 |
287 |
69779606 |
Construction of roads |
69500 |
Construction of roads1 |
Plinth level |
-
latitude : 22.01798554044217,22.01797259040177
Longitude : 87.97121884301305,87.97097316943109
file name : Image_02102024140203124.png
|
2024-10-02 14:02:03.204285 |
288 |
69779606 |
Construction of roads |
69500 |
Construction of roads1 |
Completion of work |
-
latitude : 22.018017517402768,22.018017517402768
Longitude : 87.97111817635596,87.97111817635596
file name : Image_01102024161303196.png
|
2024-10-01 16:13:03.29757 |
289 |
67780714 |
Construction of roads |
70000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.0126905,22.0126905
Longitude : 87.9718642,87.9718642
file name : Image_02102024141229129.png
|
2024-10-02 14:12:29.202142 |
290 |
67780714 |
Construction of roads |
70000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.0126778,22.0126778
Longitude : 87.9719801,87.9719801
file name : Image_02102024140800689.png
|
2024-10-02 14:08:00.767921 |
291 |
56586010 |
Construction of Concrete road with Tale Pilling from Concrete road to Nurul Babu house |
70000 |
Construction of Concrete road with Tale Pilling from Concrete road to Nurul Babu house1 |
Plinth level |
-
latitude : 22.007045564241707,22.007045564241707
Longitude : 87.96901230700314,87.96901230700314
file name : Image_23072024125804627.png
|
2024-07-23 12:58:04.724581 |
292 |
56586010 |
Construction of Concrete road with Tale Pilling from Concrete road to Nurul Babu house |
70000 |
Construction of Concrete road with Tale Pilling from Concrete road to Nurul Babu house1 |
Completion of work |
-
latitude : 22.007028297521174,22.007028297521174
Longitude : 87.96906528063118,87.96906528063118
file name : Image_23072024125111562.png
|
2024-07-23 12:51:11.666183 |
293 |
56586110 |
Construction of 01(One) nos Street Light infriont of Sk Enamul's house |
52000 |
Construction of 01(One) nos Street Light infriont of Sk Enamul's house1 |
Completion of work |
-
latitude : 22.012797561474144
Longitude : 87.9709417372942
file name : Image_21072023132756183.png
|
2023-07-21 13:27:56.285436 |
294 |
56586072 |
Construction of 01(One) nos Street Light infriont of Sk Mukhlesur's house |
52000 |
Construction of 01(One) nos Street Light infriont of Sk Mukhlesur's house1 |
Completion of work |
-
latitude : 22.019957550801337
Longitude : 87.97051576897502
file name : Image_21072023134251084.png
|
2023-07-21 13:42:51.192598 |
295 |
46982719 |
Construction of Concrete road from Debasish Sasmal's Land to Govt. road at Nandigram-XII Sansad unde |
85000 |
Construction of Concrete road from Debasish Sasmal's Land to Govt. road at Nandigram-XII Sansad unde1 |
Plinth level |
-
latitude : 22.046135617420077,22.046135617420077
Longitude : 87.95405890792608,87.95405890792608
file name : Image_23072024135513073.png
|
2024-07-23 13:55:13.376047 |
296 |
46982719 |
Construction of Concrete road from Debasish Sasmal's Land to Govt. road at Nandigram-XII Sansad unde |
85000 |
Construction of Concrete road from Debasish Sasmal's Land to Govt. road at Nandigram-XII Sansad unde1 |
Completion of work |
-
latitude : 22.04614093992859,22.04614093992859
Longitude : 87.95401574112475,87.95401574112475
file name : Image_23072024134354161.png
|
2024-07-23 13:43:54.25634 |
297 |
57584381 |
Cost for Water Testing and Water Facilator at Nandigram G.P. area |
40000 |
Cost for Water Testing and Water Facilator at Nandigram G.P. area 1 |
Completion of work |
-
latitude : 22.0147332
Longitude : 87.9736322
file name : Image_05102024120522727.png
|
2024-10-05 12:05:22.839529 |
298 |
67780548 |
Construction of roads |
80000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.003027070313692,22.003027070313692
Longitude : 87.9719912353903,87.9719912353903
file name : Image_29072024143645180.png
|
2024-07-29 14:36:45.289019 |
299 |
67780548 |
Construction of roads |
80000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.003158289007843,22.003158289007843
Longitude : 87.97210112214088,87.97210112214088
file name : Image_29072024143057882.png
|
2024-07-29 14:30:57.967643 |
300 |
67779430 |
Construction of roads |
90000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.0097432,22.0097432
Longitude : 87.9796592,87.9796592
file name : Image_29072024145157453.png
|
2024-07-29 14:51:57.545624 |
301 |
67779430 |
Construction of roads |
90000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.009691270068288,22.009691270068288
Longitude : 87.97978925518692,87.97978925518692
file name : Image_29072024144553006.png
|
2024-07-29 14:45:53.103873 |
302 |
69880042 |
Water Supply to villages |
35000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.01150096487254,22.01150096487254
Longitude : 87.9798835515976,87.9798835515976
file name : Image_06082024161343989.png
|
2024-08-06 16:13:44.157308 |
303 |
69880042 |
Water Supply to villages |
35000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.011232366785407,22.011232366785407
Longitude : 87.98042669892311,87.98042669892311
file name : Image_06082024160809365.png
|
2024-08-06 16:08:09.454796 |
304 |
69866337 |
Water Supply to villages |
30000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.00541310478002,22.00541310478002
Longitude : 87.98328476026654,87.98328476026654
file name : Image_06082024155735042.png
|
2024-08-06 15:57:35.128308 |
305 |
69866337 |
Water Supply to villages |
30000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.005440555512905,22.005440555512905
Longitude : 87.98331937752664,87.98331937752664
file name : Image_06082024154840071.png
|
2024-08-06 15:48:40.1679 |
306 |
69861174 |
Creation of a new source of drinking water |
171308 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.0106702
Longitude : 87.9799477
file name : Image_13082024164422279.png
|
2024-08-13 16:44:22.394239 |
307 |
69861174 |
Creation of a new source of drinking water |
171308 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.0106268
Longitude : 87.9799491
file name : Image_13082024163758083.png
|
2024-08-13 16:37:58.210688 |
308 |
69808516 |
Construction of roads |
180000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.04581333324313,22.04581333324313
Longitude : 87.95585959218442,87.95585959218442
file name : Image_13082024171531538.png
|
2024-08-13 17:15:31.618509 |
309 |
69808516 |
Construction of roads |
180000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.045856835320592,22.045856835320592
Longitude : 87.95581189915538,87.95581189915538
file name : Image_13082024170833115.png
|
2024-08-13 17:08:33.209368 |