1 |
57379459 |
CFC concrerte road at Chandpur sansad From Amalendu Satpati house to Parameswar Das house Jl no 237 |
100000 |
CFC concrerte road at Chandpur sansad From Amalendu Satpati house to Parameswar Das house Jl no 237 1 |
Completion of work |
-
latitude : 21.64583,21.64583
Longitude : 87.60531666666665,87.60531
file name : Image_16102023162050093.png
|
2023-10-16 16:20:50.197743 |
2 |
57379459 |
CFC concrerte road at Chandpur sansad From Amalendu Satpati house to Parameswar Das house Jl no 237 |
100000 |
CFC concrerte road at Chandpur sansad From Amalendu Satpati house to Parameswar Das house Jl no 237 1 |
Completion of work |
-
latitude : 21.645838333333337,21.645836666666664
Longitude : 87.60534833333334,87.60534166666666
file name : Image_16102023162124273.png
|
2023-10-16 16:21:24.388793 |
3 |
57379459 |
CFC concrerte road at Chandpur sansad From Amalendu Satpati house to Parameswar Das house Jl no 237 |
100000 |
CFC concrerte road at Chandpur sansad From Amalendu Satpati house to Parameswar Das house Jl no 237 1 |
Completion of work |
-
latitude : 21.645833333333332,21.645833333333332
Longitude : 87.60535333333334,87.60535166666665
file name : Image_16102023162158437.png
|
2023-10-16 16:21:58.645172 |
4 |
33407771 |
CFC Concreet rd at Bodhra Concreet rd to Bibhuti Patra |
100000 |
CFC Concreet rd at Bodhra Concreet rd to Bibhuti Patra1 |
Completion of work |
-
latitude : 21.6817969,21.6817969
Longitude : 87.5837172,87.5837172
file name : Image_04072021104539446.png
|
2021-07-04 10:45:39.601242 |
5 |
33407771 |
CFC Concreet rd at Bodhra Concreet rd to Bibhuti Patra |
100000 |
CFC Concreet rd at Bodhra Concreet rd to Bibhuti Patra1 |
Completion of work |
-
latitude : 21.6817965,21.6817936,21.6817936,21.6817942,21.6817939
Longitude : 87.5837182,87.5837176,87.5837176,87.5837128,87.5837137
file name : Image_04072021102425318.png
|
2021-07-04 10:24:25.43521 |
6 |
33407771 |
CFC Concreet rd at Bodhra Concreet rd to Bibhuti Patra |
100000 |
CFC Concreet rd at Bodhra Concreet rd to Bibhuti Patra1 |
Completion of work |
-
latitude : 21.6817965,21.6817936,21.6817936,21.6817942,21.6817939
Longitude : 87.5837182,87.5837176,87.5837176,87.5837128,87.5837137
file name : Image_04072021102516241.png
|
2021-07-04 10:25:16.359614 |
7 |
33407771 |
CFC Concreet rd at Bodhra Concreet rd to Bibhuti Patra |
100000 |
CFC Concreet rd at Bodhra Concreet rd to Bibhuti Patra1 |
Completion of work |
-
latitude : 21.6817972,21.6817972
Longitude : 87.5837173,87.5837173
file name : Image_04072021102358631.png
|
2021-07-04 10:23:58.755161 |
8 |
33407771 |
CFC Concreet rd at Bodhra Concreet rd to Bibhuti Patra |
100000 |
CFC Concreet rd at Bodhra Concreet rd to Bibhuti Patra1 |
Completion of work |
-
latitude : 21.6817975,21.6817975
Longitude : 87.5837174,87.5837174
file name : Image_04072021094858632.png
|
2021-07-04 09:48:58.762235 |
9 |
33321998 |
CFC Concreet Rd at Tengramari Manotosh Karan to Ananta Das |
150000 |
CFC Concreet Rd at Tengramari Manotosh Karan to Ananta Das1 |
Completion of work |
-
latitude : 21.6817934,21.6817934
Longitude : 87.5837153,87.5837153
file name : Image_04072021105112656.png
|
2021-07-04 10:51:12.81143 |
10 |
33321998 |
CFC Concreet Rd at Tengramari Manotosh Karan to Ananta Das |
150000 |
CFC Concreet Rd at Tengramari Manotosh Karan to Ananta Das1 |
Completion of work |
-
latitude : 21.6817948,21.6817948
Longitude : 87.5837111,87.5837111
file name : Image_04072021104850207.png
|
2021-07-04 10:48:50.34918 |
11 |
33321998 |
CFC Concreet Rd at Tengramari Manotosh Karan to Ananta Das |
150000 |
CFC Concreet Rd at Tengramari Manotosh Karan to Ananta Das1 |
Completion of work |
-
latitude : 21.6817935,21.6817935
Longitude : 87.5837169,87.5837169
file name : Image_04072021104545509.png
|
2021-07-04 10:45:45.647377 |
12 |
33407827 |
CFC Concreet rd at Bodhra Pacha Bandh Concreet rd to Rajendra Patra |
100000 |
CFC Concreet rd at Bodhra Pacha Bandh Concreet rd to Rajendra Patra1 |
Completion of work |
-
latitude : 21.651257746852934,21.651187799870968,21.651187799870968
Longitude : 87.58509121835232,87.58508660830557,87.58508660830557
file name : Image_07072021161825092.png
|
2021-07-07 16:18:25.42856 |
13 |
33407827 |
CFC Concreet rd at Bodhra Pacha Bandh Concreet rd to Rajendra Patra |
100000 |
CFC Concreet rd at Bodhra Pacha Bandh Concreet rd to Rajendra Patra1 |
Completion of work |
-
latitude : 21.651267134584486,21.65120728779584,21.651199534535408,21.651199534535408,21.65119911544025,21.651198654435575
Longitude : 87.58507386781275,87.58506900630891,87.58507805876434,87.58507805876434,87.58507898077369,87.585079818964
file name : Image_07072021161840369.png
|
2021-07-07 16:18:40.693905 |
14 |
33407827 |
CFC Concreet rd at Bodhra Pacha Bandh Concreet rd to Rajendra Patra |
100000 |
CFC Concreet rd at Bodhra Pacha Bandh Concreet rd to Rajendra Patra1 |
Completion of work |
-
latitude : 21.651267134584486,21.65120728779584,21.651199534535408,21.651199534535408,21.65119911544025,21.651198654435575
Longitude : 87.58507386781275,87.58506900630891,87.58507805876434,87.58507805876434,87.58507898077369,87.585079818964
file name : Image_07072021161829532.png
|
2021-07-07 16:18:29.785711 |
15 |
33407827 |
CFC Concreet rd at Bodhra Pacha Bandh Concreet rd to Rajendra Patra |
100000 |
CFC Concreet rd at Bodhra Pacha Bandh Concreet rd to Rajendra Patra1 |
Completion of work |
-
latitude : 21.65121772326529,21.651215124875307
Longitude : 87.58509314619005,87.58509180508554
file name : Image_07072021161302335.png
|
2021-07-07 16:13:02.52565 |
16 |
33407827 |
CFC Concreet rd at Bodhra Pacha Bandh Concreet rd to Rajendra Patra |
100000 |
CFC Concreet rd at Bodhra Pacha Bandh Concreet rd to Rajendra Patra1 |
Completion of work |
-
latitude : 21.651257160119712,21.651257411576807
Longitude : 87.58510429412127,87.58510529994965
file name : Image_07072021160932863.png
|
2021-07-07 16:09:33.154831 |
17 |
33399496 |
CFC Boundary Wall at Tajpur of Tajpur Play Ground |
100000 |
CFC Boundary Wall at Tajpur of Tajpur Play Ground1 |
Plinth level |
-
latitude : 21.654127836227417
Longitude : 87.6313827931881
file name : Image_06012022133254292.png
|
2022-01-06 13:32:54.425627 |
18 |
33399496 |
CFC Boundary Wall at Tajpur of Tajpur Play Ground |
100000 |
CFC Boundary Wall at Tajpur of Tajpur Play Ground1 |
Completion of work |
-
latitude : 21.6529794
Longitude : 87.6293467
file name : Image_07072021171116070.png
|
2021-07-07 17:11:16.289998 |
19 |
33399496 |
CFC Boundary Wall at Tajpur of Tajpur Play Ground |
100000 |
CFC Boundary Wall at Tajpur of Tajpur Play Ground1 |
Completion of work |
-
latitude : 21.6529794
Longitude : 87.6293467
file name : Image_07072021170952501.png
|
2021-07-07 17:09:52.76274 |
20 |
33399496 |
CFC Boundary Wall at Tajpur of Tajpur Play Ground |
100000 |
CFC Boundary Wall at Tajpur of Tajpur Play Ground1 |
Completion of work |
-
latitude : 21.653226404450834
Longitude : 87.62876596301794
file name : Image_07072021170215967.png
|
2021-07-07 17:02:16.265918 |
21 |
33399496 |
CFC Boundary Wall at Tajpur of Tajpur Play Ground |
100000 |
CFC Boundary Wall at Tajpur of Tajpur Play Ground1 |
Completion of work |
-
latitude : 21.6529792
Longitude : 87.6293412
file name : Image_07072021165911199.png
|
2021-07-07 16:59:11.359865 |
22 |
33399496 |
CFC Boundary Wall at Tajpur of Tajpur Play Ground |
100000 |
CFC Boundary Wall at Tajpur of Tajpur Play Ground1 |
Completion of work |
-
latitude : 21.653230930678546
Longitude : 87.62874643318355
file name : Image_07072021165859652.png
|
2021-07-07 16:58:59.862471 |
23 |
33399496 |
CFC Boundary Wall at Tajpur of Tajpur Play Ground |
100000 |
CFC Boundary Wall at Tajpur of Tajpur Play Ground1 |
Completion of work |
-
latitude : 21.6529792
Longitude : 87.6293412
file name : Image_07072021165903471.png
|
2021-07-07 16:59:03.73401 |
24 |
33399496 |
CFC Boundary Wall at Tajpur of Tajpur Play Ground |
100000 |
CFC Boundary Wall at Tajpur of Tajpur Play Ground1 |
Completion of work |
-
latitude : 21.653230930678546
Longitude : 87.62874643318355
file name : Image_07072021165907377.png
|
2021-07-07 16:59:07.546112 |
25 |
33399496 |
CFC Boundary Wall at Tajpur of Tajpur Play Ground |
100000 |
CFC Boundary Wall at Tajpur of Tajpur Play Ground1 |
Completion of work |
-
latitude : 21.65324434172362
Longitude : 87.62872505933046
file name : Image_07072021165855719.png
|
2021-07-07 16:58:55.935626 |
26 |
33319605 |
CFC Concreet rd at Chandpur Mukteswar Giri to Pramatha Shit |
100000 |
CFC Concreet rd at Chandpur Mukteswar Giri to Pramatha Shit1 |
Completion of work |
-
latitude : 21.643366,21.643366,21.643366,21.643366
Longitude : 87.5975502,87.5975502,87.5975502,87.5975502
file name : Image_13072021131040441.png
|
2021-07-13 13:10:40.58538 |
27 |
33319605 |
CFC Concreet rd at Chandpur Mukteswar Giri to Pramatha Shit |
100000 |
CFC Concreet rd at Chandpur Mukteswar Giri to Pramatha Shit1 |
Completion of work |
-
latitude : 21.6433663,21.6433663
Longitude : 87.5975491,87.5975491
file name : Image_13072021130946304.png
|
2021-07-13 13:09:46.435496 |
28 |
33319605 |
CFC Concreet rd at Chandpur Mukteswar Giri to Pramatha Shit |
100000 |
CFC Concreet rd at Chandpur Mukteswar Giri to Pramatha Shit1 |
Completion of work |
-
latitude : 21.6433663,21.6433663,21.6433663
Longitude : 87.5975491,87.5975491,87.5975491
file name : Image_13072021130842483.png
|
2021-07-13 13:08:42.624774 |
29 |
33319906 |
CFC Concreet rd at Chandpur Black Top rd to Saktipada Jana res |
100000 |
CFC Concreet rd at Chandpur Black Top rd to Saktipada Jana res1 |
Completion of work |
-
latitude : 21.642245817929506,21.642245817929506,21.642245817929506,21.642245817929506
Longitude : 87.59312560781837,87.59312560781837,87.59312560781837,87.59312560781837
file name : Image_13072021131910259.png
|
2021-07-13 13:19:10.416354 |
30 |
33319906 |
CFC Concreet rd at Chandpur Black Top rd to Saktipada Jana res |
100000 |
CFC Concreet rd at Chandpur Black Top rd to Saktipada Jana res1 |
Completion of work |
-
latitude : 21.642245817929506,21.642245817929506,21.642245817929506
Longitude : 87.59312560781837,87.59312560781837,87.59312560781837
file name : Image_13072021131813214.png
|
2021-07-13 13:18:13.336003 |
31 |
33319906 |
CFC Concreet rd at Chandpur Black Top rd to Saktipada Jana res |
100000 |
CFC Concreet rd at Chandpur Black Top rd to Saktipada Jana res1 |
Completion of work |
-
latitude : 21.642245817929506,21.642245817929506
Longitude : 87.59312560781837,87.59312560781837
file name : Image_13072021131714760.png
|
2021-07-13 13:17:14.889339 |
32 |
33408523 |
CFC Concreet rd at Deulbatta PMAY rd to Sea Dyck |
100000 |
CFC Concreet rd at Deulbatta PMAY rd to Sea Dyck1 |
Completion of work |
-
latitude : 21.663849628530443,21.663849628530443,21.663849628530443
Longitude : 87.558154463768,87.558154463768,87.558154463768
file name : Image_04082021162734344.png
|
2021-08-04 16:27:34.424091 |
33 |
33408523 |
CFC Concreet rd at Deulbatta PMAY rd to Sea Dyck |
100000 |
CFC Concreet rd at Deulbatta PMAY rd to Sea Dyck1 |
Completion of work |
-
latitude : 21.663879635743797,21.663879635743797,21.663879635743797,21.663879635743797
Longitude : 87.55810895003378,87.55810895003378,87.55810895003378,87.55810895003378
file name : Image_04082021162535795.png
|
2021-08-04 16:25:35.878647 |
34 |
33408523 |
CFC Concreet rd at Deulbatta PMAY rd to Sea Dyck |
100000 |
CFC Concreet rd at Deulbatta PMAY rd to Sea Dyck1 |
Completion of work |
-
latitude : 21.663879635743797,21.663879635743797,21.663879635743797
Longitude : 87.55810895003378,87.55810895003378,87.55810895003378
file name : Image_04082021162359540.png
|
2021-08-04 16:23:59.642627 |
35 |
33330887 |
CFC Concreet Rd at Jaldha from Sasanka Das shop to Badal Das |
130000 |
CFC Concreet Rd at Jaldha from Sasanka Das shop to Badal Das1 |
Completion of work |
-
latitude : 21.645822837017477,21.645822837017477,21.645822837017477
Longitude : 87.60689338669181,87.60689338669181,87.60689338669181
file name : Image_13072021124928015.png
|
2021-07-13 12:49:28.147913 |
36 |
33330887 |
CFC Concreet Rd at Jaldha from Sasanka Das shop to Badal Das |
130000 |
CFC Concreet Rd at Jaldha from Sasanka Das shop to Badal Das1 |
Completion of work |
-
latitude : 21.64580682758242,21.64580682758242,21.645805570296943
Longitude : 87.60693269781768,87.60693269781768,87.60693437419832
file name : Image_13072021124800733.png
|
2021-07-13 12:48:00.866115 |
37 |
33330887 |
CFC Concreet Rd at Jaldha from Sasanka Das shop to Badal Das |
130000 |
CFC Concreet Rd at Jaldha from Sasanka Das shop to Badal Das1 |
Completion of work |
-
latitude : 21.645819819532335,21.645819819532335
Longitude : 87.60682029649615,87.60682029649615
file name : Image_13072021124641802.png
|
2021-07-13 12:46:41.924949 |
38 |
33326913 |
CFC Concreet Rd at Jamra Shyampur Prasanta Bera to Bimal Majhi |
100000 |
CFC Concreet Rd at Jamra Shyampur Prasanta Bera to Bimal Majhi1 |
Completion of work |
-
latitude : 21.639795494265854,21.639795494265854,21.639795494265854,21.639795494265854
Longitude : 87.58543990552425,87.58543990552425,87.58543990552425,87.58543990552425
file name : Image_04082021151058408.png
|
2021-08-04 15:10:58.507648 |
39 |
33326913 |
CFC Concreet Rd at Jamra Shyampur Prasanta Bera to Bimal Majhi |
100000 |
CFC Concreet Rd at Jamra Shyampur Prasanta Bera to Bimal Majhi1 |
Completion of work |
-
latitude : 21.639789501205087,21.639734809286892,21.639727810397744
Longitude : 87.58544661104679,87.585455076769,87.58546848781407
file name : Image_04082021150925089.png
|
2021-08-04 15:09:25.160524 |
40 |
33326913 |
CFC Concreet Rd at Jamra Shyampur Prasanta Bera to Bimal Majhi |
100000 |
CFC Concreet Rd at Jamra Shyampur Prasanta Bera to Bimal Majhi1 |
Completion of work |
-
latitude : 21.6398268006742,21.639797128736973
Longitude : 87.58535382337868,87.58539447560906
file name : Image_04082021150721649.png
|
2021-08-04 15:07:21.750119 |
41 |
33322627 |
CFC Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap |
200000 |
CFC Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap1 |
Roof laid |
-
latitude : 21.661306666666665
Longitude : 87.59575333333332
file name : Image_17122022171905106.png
|
2022-12-17 17:19:05.195664 |
42 |
33322627 |
CFC Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap |
200000 |
CFC Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap1 |
Roof laid |
-
latitude : 21.661341666666665
Longitude : 87.59586166666668
file name : Image_17122022171939713.png
|
2022-12-17 17:19:39.793002 |
43 |
33322627 |
CFC Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap |
200000 |
CFC Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap1 |
Roof laid |
-
latitude : 21.661321666666662
Longitude : 87.59581000000001
file name : Image_17122022172009159.png
|
2022-12-17 17:20:09.239954 |
44 |
33322627 |
CFC Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap |
200000 |
CFC Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap1 |
Completion of work |
-
latitude : 21.661232840269804
Longitude : 87.59570606052876
file name : Image_14082021174806047.png
|
2021-08-14 17:48:06.136935 |
45 |
33322627 |
CFC Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap |
200000 |
CFC Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap1 |
Completion of work |
-
latitude : 21.661284556612372
Longitude : 87.59568954817951
file name : Image_14082021174610835.png
|
2021-08-14 17:46:10.923341 |
46 |
33322627 |
CFC Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap |
200000 |
CFC Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap1 |
Completion of work |
-
latitude : 21.661293525248766
Longitude : 87.59578895755112
file name : Image_14082021174337209.png
|
2021-08-14 17:43:37.336075 |
47 |
33322627 |
CFC Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap |
200000 |
CFC Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap1 |
Completion of work |
-
latitude : 21.66127952747047
Longitude : 87.59573514573276
file name : Image_14082021174340934.png
|
2021-08-14 17:43:41.022536 |
48 |
33322627 |
CFC Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap |
200000 |
CFC Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap1 |
Completion of work |
-
latitude : 21.66132525075227
Longitude : 87.59584972634912
file name : Image_14082021174344959.png
|
2021-08-14 17:43:45.044419 |
49 |
33322627 |
CFC Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap |
200000 |
CFC Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap1 |
Completion of work |
-
latitude : 21.66129369288683
Longitude : 87.59576356038451
file name : Image_14082021174348361.png
|
2021-08-14 17:43:48.446327 |
50 |
33328614 |
CFC Concreet Rd at Dublabari Mukundanath Bera to Pramatha Giri |
100000 |
CFC Concreet Rd at Dublabari Mukundanath Bera to Pramatha Giri1 |
Completion of work |
-
latitude : 21.670031072571874,21.67003312613815,21.67003312613815,21.67003312613815
Longitude : 87.60004738345742,87.60004964657128,87.60004964657128,87.60004964657128
file name : Image_02092021130354718.png
|
2021-09-02 13:03:54.795562 |
51 |
33328614 |
CFC Concreet Rd at Dublabari Mukundanath Bera to Pramatha Giri |
100000 |
CFC Concreet Rd at Dublabari Mukundanath Bera to Pramatha Giri1 |
Completion of work |
-
latitude : 21.67006560601294,21.67006560601294,21.67006560601294
Longitude : 87.60011192411184,87.60011192411184,87.60011192411184
file name : Image_02092021130006772.png
|
2021-09-02 13:00:06.863133 |
52 |
33328614 |
CFC Concreet Rd at Dublabari Mukundanath Bera to Pramatha Giri |
100000 |
CFC Concreet Rd at Dublabari Mukundanath Bera to Pramatha Giri1 |
Completion of work |
-
latitude : 21.670009824447334,21.67004527989775,21.67004527989775,21.67004578281194
Longitude : 87.60006138123572,87.60004612617195,87.60004612617195,87.6000465452671
file name : Image_02092021130214376.png
|
2021-09-02 13:02:14.453913 |
53 |
33328614 |
CFC Concreet Rd at Dublabari Mukundanath Bera to Pramatha Giri |
100000 |
CFC Concreet Rd at Dublabari Mukundanath Bera to Pramatha Giri1 |
Completion of work |
-
latitude : 21.67006560601294,21.67006560601294,21.67006560601294
Longitude : 87.60011192411184,87.60011192411184,87.60011192411184
file name : Image_02092021130022804.png
|
2021-09-02 13:00:22.886306 |
54 |
33328614 |
CFC Concreet Rd at Dublabari Mukundanath Bera to Pramatha Giri |
100000 |
CFC Concreet Rd at Dublabari Mukundanath Bera to Pramatha Giri1 |
Completion of work |
-
latitude : 21.670069377869368,21.67008706368506
Longitude : 87.60003422386944,87.60003506205976
file name : Image_02092021125951292.png
|
2021-09-02 12:59:51.385199 |
55 |
33328077 |
CFC Concreet Rd at Dublabari Atul Khatua to Juthika Santra |
100000 |
CFC Concreet Rd at Dublabari Atul Khatua to Juthika Santra1 |
Completion of work |
-
latitude : 21.669882461428642,21.669882461428642,21.669882461428642,21.66989654302597,21.66989654302597
Longitude : 87.59878464974463,87.59878464974463,87.59878464974463,87.59877392090857,87.59877392090857
file name : Image_02092021132306771.png
|
2021-09-02 13:23:06.85917 |
56 |
33328077 |
CFC Concreet Rd at Dublabari Atul Khatua to Juthika Santra |
100000 |
CFC Concreet Rd at Dublabari Atul Khatua to Juthika Santra1 |
Completion of work |
-
latitude : 21.66989402845502,21.66989402845502,21.66989402845502,21.66989402845502
Longitude : 87.59874693118036,87.59874693118036,87.59874693118036,87.59874693118036
file name : Image_02092021131124486.png
|
2021-09-02 13:11:24.567795 |
57 |
33328077 |
CFC Concreet Rd at Dublabari Atul Khatua to Juthika Santra |
100000 |
CFC Concreet Rd at Dublabari Atul Khatua to Juthika Santra1 |
Completion of work |
-
latitude : 21.669860458932817,21.669860458932817,21.669860458932817,21.669860458932817,21.669860458932817
Longitude : 87.59875405579805,87.59875405579805,87.59875405579805,87.59875405579805,87.59875405579805
file name : Image_02092021131004006.png
|
2021-09-02 13:10:04.089022 |
58 |
33409138 |
CFC Pacca Ghat at Deulbatta at Harisamaj Pukur |
100000 |
CFC Pacca Ghat at Deulbatta at Harisamaj Pukur1 |
Roof laid |
-
latitude : 21.66461900342256
Longitude : 87.55576436407864
file name : Image_12112021150012011.png
|
2021-11-12 15:00:12.150517 |
59 |
33409138 |
CFC Pacca Ghat at Deulbatta at Harisamaj Pukur |
100000 |
CFC Pacca Ghat at Deulbatta at Harisamaj Pukur1 |
Completion of work |
-
latitude : 21.66465471033007
Longitude : 87.55576075986028
file name : Image_12112021144805226.png
|
2021-11-12 14:48:05.320002 |
60 |
33409138 |
CFC Pacca Ghat at Deulbatta at Harisamaj Pukur |
100000 |
CFC Pacca Ghat at Deulbatta at Harisamaj Pukur1 |
Completion of work |
-
latitude : 21.664619129151106
Longitude : 87.55578766576946
file name : Image_12112021144603150.png
|
2021-11-12 14:46:03.236486 |
61 |
33337794 |
CFC Concreet Rd at Jaldha from Jaldha MSK to Subal Patra |
200000 |
CFC Concreet Rd at Jaldha from Jaldha MSK to Subal Patra1 |
Completion of work |
-
latitude : 21.651295591145754,21.651295591145754,21.651290729641914
Longitude : 87.60515422560275,87.60515422560275,87.6051860768348
file name : Image_16092021152423511.png
|
2021-09-16 15:24:23.592524 |
62 |
33337794 |
CFC Concreet Rd at Jaldha from Jaldha MSK to Subal Patra |
200000 |
CFC Concreet Rd at Jaldha from Jaldha MSK to Subal Patra1 |
Completion of work |
-
latitude : 21.651377859525383,21.651377859525383,21.65126709267497
Longitude : 87.60517886839807,87.60517886839807,87.60523150674999
file name : Image_16092021152251835.png
|
2021-09-16 15:22:51.903521 |
63 |
33337794 |
CFC Concreet Rd at Jaldha from Jaldha MSK to Subal Patra |
200000 |
CFC Concreet Rd at Jaldha from Jaldha MSK to Subal Patra1 |
Completion of work |
-
latitude : 21.651250538416207,21.651250538416207,21.651223842054605
Longitude : 87.60514039546251,87.60514039546251,87.60514860972762
file name : Image_16092021151850021.png
|
2021-09-16 15:18:50.110231 |
64 |
38962599 |
CFC Sinking of Submarsel Pump at Jaldha near Tapan Barai |
200000 |
CFC Sinking of Submarsel Pump at Jaldha near Tapan Barai1 |
Completion of work |
-
latitude : 21.645913990214467
Longitude : 87.61169328354299
file name : Image_16092021153452326.png
|
2021-09-16 15:34:52.398701 |
65 |
38962599 |
CFC Sinking of Submarsel Pump at Jaldha near Tapan Barai |
200000 |
CFC Sinking of Submarsel Pump at Jaldha near Tapan Barai1 |
Completion of work |
-
latitude : 21.645869775675237
Longitude : 87.6116983126849
file name : Image_16092021153352594.png
|
2021-09-16 15:33:52.668512 |
66 |
38962599 |
CFC Sinking of Submarsel Pump at Jaldha near Tapan Barai |
200000 |
CFC Sinking of Submarsel Pump at Jaldha near Tapan Barai1 |
Completion of work |
-
latitude : 21.64588117506355
Longitude : 87.61170418001711
file name : Image_16092021153253009.png
|
2021-09-16 15:32:53.085307 |
67 |
33322213 |
CFC Concreet Rd at Tengramari Saheb Pukur to Prasanta Dey |
100000 |
CFC Concreet Rd at Tengramari Saheb Pukur to Prasanta Dey1 |
Roof laid |
-
latitude : 21.651306697167456,21.651277192868292
Longitude : 87.5884195882827,87.58842545561492
file name : Image_03032022141054978.png
|
2022-03-03 14:10:55.051638 |
68 |
33322213 |
CFC Concreet Rd at Tengramari Saheb Pukur to Prasanta Dey |
100000 |
CFC Concreet Rd at Tengramari Saheb Pukur to Prasanta Dey1 |
Roof laid |
-
latitude : 21.65134257171303,21.65134257171303
Longitude : 87.5883989688009,87.5883989688009
file name : Image_03032022141133765.png
|
2022-03-03 14:11:33.833399 |
69 |
33322213 |
CFC Concreet Rd at Tengramari Saheb Pukur to Prasanta Dey |
100000 |
CFC Concreet Rd at Tengramari Saheb Pukur to Prasanta Dey1 |
Roof laid |
-
latitude : 21.651309044100344,21.651309044100344
Longitude : 87.5884074345231,87.5884074345231
file name : Image_03032022141209991.png
|
2022-03-03 14:12:10.099475 |
70 |
33410753 |
CFC Concreet rd at Bherichauli Raghu Pradhan to Babla Pradhan |
124106 |
CFC Concreet rd at Bherichauli Raghu Pradhan to Babla Pradhan1 |
Completion of work |
-
latitude : 21.65514108259231,21.65514074731618,21.65514074731618,21.65514074731618
Longitude : 87.60640162043273,87.60640296153724,87.60640296153724,87.60640296153724
file name : Image_18122021140644072.png
|
2021-12-18 14:06:44.145163 |
71 |
33410753 |
CFC Concreet rd at Bherichauli Raghu Pradhan to Babla Pradhan |
124106 |
CFC Concreet rd at Bherichauli Raghu Pradhan to Babla Pradhan1 |
Completion of work |
-
latitude : 21.65517972316593,21.65517972316593,21.655154577456415,21.655154577456415
Longitude : 87.606439338997,87.606439338997,87.60647538118064,87.60647538118064
file name : Image_18122021140555757.png
|
2021-12-18 14:05:55.818871 |
72 |
33410753 |
CFC Concreet rd at Bherichauli Raghu Pradhan to Babla Pradhan |
124106 |
CFC Concreet rd at Bherichauli Raghu Pradhan to Babla Pradhan1 |
Completion of work |
-
latitude : 21.65517972316593,21.65517972316593,21.655154577456415,21.655154577456415
Longitude : 87.606439338997,87.606439338997,87.60647538118064,87.60647538118064
file name : Image_18122021140559665.png
|
2021-12-18 14:05:59.738496 |
73 |
33410753 |
CFC Concreet rd at Bherichauli Raghu Pradhan to Babla Pradhan |
124106 |
CFC Concreet rd at Bherichauli Raghu Pradhan to Babla Pradhan1 |
Completion of work |
-
latitude : 21.65519711561501,21.65519711561501,21.65519711561501
Longitude : 87.60648535564542,87.60648535564542,87.60648535564542
file name : Image_18122021140552480.png
|
2021-12-18 14:05:52.547344 |
74 |
33410753 |
CFC Concreet rd at Bherichauli Raghu Pradhan to Babla Pradhan |
124106 |
CFC Concreet rd at Bherichauli Raghu Pradhan to Babla Pradhan1 |
Completion of work |
-
latitude : 21.655196445062757,21.655196445062757,21.65516849141568,21.65516849141568
Longitude : 87.6064969226718,87.6064969226718,87.60647781193256,87.60647781193256
file name : Image_18122021140026408.png
|
2021-12-18 14:00:26.504244 |
75 |
33408601 |
CFC Pacca Drain at Bahadurpur Janmenjoy Patra to Kshemanta Sahoo |
200000 |
CFC Pacca Drain at Bahadurpur Janmenjoy Patra to Kshemanta Sahoo1 |
Completion of work |
-
latitude : 21.66462080553174,21.66462080553174,21.66462080553174,21.66462080553174
Longitude : 87.55181062035263,87.55181062035263,87.55181062035263,87.55181062035263
file name : Image_18122021124748131.png
|
2021-12-18 12:47:48.217253 |
76 |
33408601 |
CFC Pacca Drain at Bahadurpur Janmenjoy Patra to Kshemanta Sahoo |
200000 |
CFC Pacca Drain at Bahadurpur Janmenjoy Patra to Kshemanta Sahoo1 |
Completion of work |
-
latitude : 21.664572190493345,21.664572190493345,21.664572190493345,21.664572190493345,21.664572190493345,21.664572190493345
Longitude : 87.55178765393794,87.55178765393794,87.55178765393794,87.55178765393794,87.55178765393794,87.55178765393794
file name : Image_18122021122951016.png
|
2021-12-18 12:29:51.103028 |
77 |
33408601 |
CFC Pacca Drain at Bahadurpur Janmenjoy Patra to Kshemanta Sahoo |
200000 |
CFC Pacca Drain at Bahadurpur Janmenjoy Patra to Kshemanta Sahoo1 |
Completion of work |
-
latitude : 21.664572190493345,21.664572190493345,21.664572190493345,21.664572190493345,21.664572190493345
Longitude : 87.55178765393794,87.55178765393794,87.55178765393794,87.55178765393794,87.55178765393794
file name : Image_18122021123113461.png
|
2021-12-18 12:31:13.541938 |
78 |
33408601 |
CFC Pacca Drain at Bahadurpur Janmenjoy Patra to Kshemanta Sahoo |
200000 |
CFC Pacca Drain at Bahadurpur Janmenjoy Patra to Kshemanta Sahoo1 |
Completion of work |
-
latitude : 21.66459997650236,21.66459997650236,21.66459804866463
Longitude : 87.55176686681807,87.55176686681807,87.5517656095326
file name : Image_18122021122823254.png
|
2021-12-18 12:28:23.358797 |
79 |
33398315 |
CFC Concreet Rd at Bodhra Gour Sankar to Bankesh Das |
100000 |
CFC Concreet Rd at Bodhra Gour Sankar to Bankesh Das1 |
Completion of work |
-
latitude : 21.65956815239042,21.659542587585747,21.659542587585747,21.659542587585747
Longitude : 87.58164441213012,87.58163410238922,87.58163410238922,87.58163410238922
file name : Image_18122021131918548.png
|
2021-12-18 13:19:18.617455 |
80 |
33398315 |
CFC Concreet Rd at Bodhra Gour Sankar to Bankesh Das |
100000 |
CFC Concreet Rd at Bodhra Gour Sankar to Bankesh Das1 |
Completion of work |
-
latitude : 21.659580725245178,21.659580725245178,21.659576324746013,21.659576324746013
Longitude : 87.58163368329406,87.58163368329406,87.58163066580892,87.58163066580892
file name : Image_18122021131325970.png
|
2021-12-18 13:13:26.043494 |
81 |
33398315 |
CFC Concreet Rd at Bodhra Gour Sankar to Bankesh Das |
100000 |
CFC Concreet Rd at Bodhra Gour Sankar to Bankesh Das1 |
Completion of work |
-
latitude : 21.659584874287248,21.659561446867883,21.659561446867883,21.659561446867883,21.6595614887774
Longitude : 87.58162077516317,87.58162999525666,87.58162999525666,87.58162999525666,87.5816298276186
file name : Image_18122021131517005.png
|
2021-12-18 13:15:17.079826 |
82 |
33398315 |
CFC Concreet Rd at Bodhra Gour Sankar to Bankesh Das |
100000 |
CFC Concreet Rd at Bodhra Gour Sankar to Bankesh Das1 |
Completion of work |
-
latitude : 21.65956207551062,21.65956207551062,21.65956207551062
Longitude : 87.5816697254777,87.5816697254777,87.5816697254777
file name : Image_18122021131033184.png
|
2021-12-18 13:10:33.287027 |
83 |
38962354 |
CFC Pacca Drain at Bodhra from Jaykrishna Pradhan to Pulin Pariari |
200000 |
CFC Pacca Drain at Bodhra from Jaykrishna Pradhan to Pulin Pariari1 |
Completion of work |
-
latitude : 21.659321975894272
Longitude : 87.58317570202053
file name : Image_18022022153154105.png
|
2022-02-18 15:31:54.204767 |
84 |
38962354 |
CFC Pacca Drain at Bodhra from Jaykrishna Pradhan to Pulin Pariari |
200000 |
CFC Pacca Drain at Bodhra from Jaykrishna Pradhan to Pulin Pariari1 |
Completion of work |
-
latitude : 21.6593006439507
Longitude : 87.5831182859838
file name : Image_18022022153233542.png
|
2022-02-18 15:32:33.613749 |
85 |
38962354 |
CFC Pacca Drain at Bodhra from Jaykrishna Pradhan to Pulin Pariari |
200000 |
CFC Pacca Drain at Bodhra from Jaykrishna Pradhan to Pulin Pariari1 |
Completion of work |
-
latitude : 21.659357263706625
Longitude : 87.5831565912813
file name : Image_18022022153310015.png
|
2022-02-18 15:33:10.088185 |
86 |
33421670 |
CFC Repiaring of Tube well |
271788 |
CFC Repiaring of Tube well2 |
Completion of work |
-
latitude : 21.6589123
Longitude : 87.5896605
file name : Image_02062022123139562.png
|
2022-06-02 12:31:39.670475 |
87 |
33421670 |
CFC Repiaring of Tube well |
271788 |
CFC Repiaring of Tube well2 |
Completion of work |
-
latitude : 21.658257516101003
Longitude : 87.58889769203961
file name : Image_29122021123400661.png
|
2021-12-29 12:34:00.77014 |
88 |
33407408 |
CFC Sinking of Tarapump Tube Well at Tajpur near Bijoy Mandal |
200000 |
CFC Sinking of Tarapump Tube Well at Tajpur near Bijoy Mandal1 |
Completion of work |
-
latitude : 21.65413609240204
Longitude : 87.6313653588295
file name : Image_06012022133414607.png
|
2022-01-06 13:34:14.726858 |
89 |
33407408 |
CFC Sinking of Tarapump Tube Well at Tajpur near Bijoy Mandal |
200000 |
CFC Sinking of Tarapump Tube Well at Tajpur near Bijoy Mandal1 |
Completion of work |
-
latitude : 21.654124441556633
Longitude : 87.63138405047357
file name : Image_06012022133143559.png
|
2022-01-06 13:31:43.715977 |
90 |
38962292 |
CFC Sinking of Submarsel Pump at Bahadurpur near Samajbari |
300000 |
CFC Sinking of Submarsel Pump at Bahadurpur near Samajbari1 |
Completion of work |
-
latitude : 21.652073641307652
Longitude : 87.55215662531555
file name : Image_06012022142353613.png
|
2022-01-06 14:23:53.760139 |
91 |
38962292 |
CFC Sinking of Submarsel Pump at Bahadurpur near Samajbari |
300000 |
CFC Sinking of Submarsel Pump at Bahadurpur near Samajbari1 |
Completion of work |
-
latitude : 21.65206496603787
Longitude : 87.55218805745244
file name : Image_06012022142311798.png
|
2022-01-06 14:23:11.936098 |
92 |
38962292 |
CFC Sinking of Submarsel Pump at Bahadurpur near Samajbari |
300000 |
CFC Sinking of Submarsel Pump at Bahadurpur near Samajbari1 |
Completion of work |
-
latitude : 21.652086884714663
Longitude : 87.55209258757532
file name : Image_06012022142154623.png
|
2022-01-06 14:21:54.780969 |
93 |
38962737 |
CFC Sinking of Submarsel Pump at Shankarpur near Mahadeb Mandir |
220000 |
CFC Sinking of Submarsel Pump at Shankarpur near Mahadeb Mandir1 |
Completion of work |
-
latitude : 21.64724155794829
Longitude : 87.57292949594557
file name : Image_06012022152249687.png
|
2022-01-06 15:22:49.778861 |
94 |
38962737 |
CFC Sinking of Submarsel Pump at Shankarpur near Mahadeb Mandir |
220000 |
CFC Sinking of Submarsel Pump at Shankarpur near Mahadeb Mandir1 |
Completion of work |
-
latitude : 21.647213059477508
Longitude : 87.57288456894457
file name : Image_06012022152214591.png
|
2022-01-06 15:22:14.679073 |
95 |
38962737 |
CFC Sinking of Submarsel Pump at Shankarpur near Mahadeb Mandir |
220000 |
CFC Sinking of Submarsel Pump at Shankarpur near Mahadeb Mandir1 |
Completion of work |
-
latitude : 21.64720991626382
Longitude : 87.5728608481586
file name : Image_06012022152134322.png
|
2022-01-06 15:21:34.423088 |
96 |
38962988 |
CFC Sinking of Submarsel Pump at Tengramari near Chaitanya Dey |
200000 |
CFC Sinking of Submarsel Pump at Tengramari near Chaitanya Dey 1 |
Completion of work |
-
latitude : 21.65681440383196
Longitude : 87.59517087601125
file name : Image_10012022150443385.png
|
2022-01-10 15:04:43.459147 |
97 |
38962988 |
CFC Sinking of Submarsel Pump at Tengramari near Chaitanya Dey |
200000 |
CFC Sinking of Submarsel Pump at Tengramari near Chaitanya Dey 1 |
Completion of work |
-
latitude : 21.65671947877854
Longitude : 87.59517305530608
file name : Image_10012022150326184.png
|
2022-01-10 15:03:26.265559 |
98 |
38962988 |
CFC Sinking of Submarsel Pump at Tengramari near Chaitanya Dey |
200000 |
CFC Sinking of Submarsel Pump at Tengramari near Chaitanya Dey 1 |
Completion of work |
-
latitude : 21.656773667782545
Longitude : 87.5951871369034
file name : Image_10012022150236937.png
|
2022-01-10 15:02:37.01799 |
99 |
38962988 |
CFC Sinking of Submarsel Pump at Tengramari near Chaitanya Dey |
200000 |
CFC Sinking of Submarsel Pump at Tengramari near Chaitanya Dey 1 |
Completion of work |
-
latitude : 21.65673335082829
Longitude : 87.59512276388705
file name : Image_10012022150139720.png
|
2022-01-10 15:01:39.830905 |
100 |
38962672 |
CFC Sinking of Submarsel Pump at Dublabari near Susanta Chuyan |
200000 |
CFC Sinking of Submarsel Pump at Dublabari near Susanta Chuyan1 |
Completion of work |
-
latitude : 21.670735864900053
Longitude : 87.60531524196267
file name : Image_10012022153929993.png
|
2022-01-10 15:39:30.085704 |
101 |
38962672 |
CFC Sinking of Submarsel Pump at Dublabari near Susanta Chuyan |
200000 |
CFC Sinking of Submarsel Pump at Dublabari near Susanta Chuyan1 |
Completion of work |
-
latitude : 21.670708749443293
Longitude : 87.60535094887018
file name : Image_10012022153838397.png
|
2022-01-10 15:38:38.491401 |
102 |
38962672 |
CFC Sinking of Submarsel Pump at Dublabari near Susanta Chuyan |
200000 |
CFC Sinking of Submarsel Pump at Dublabari near Susanta Chuyan1 |
Completion of work |
-
latitude : 21.670746468007565
Longitude : 87.60535446926951
file name : Image_10012022153507600.png
|
2022-01-10 15:35:07.717078 |
103 |
33331031 |
CFC Concreet Rd at Jaldha from Sea dyck banndh to plot 365 |
200000 |
CFC Concreet Rd at Jaldha from Sea dyck banndh to plot 3651 |
Completion of work |
-
latitude : 21.6497645,21.6497645
Longitude : 87.6128272,87.6128272
file name : Image_30012022080851674.png
|
2022-01-30 08:08:51.75883 |
104 |
33331031 |
CFC Concreet Rd at Jaldha from Sea dyck banndh to plot 365 |
200000 |
CFC Concreet Rd at Jaldha from Sea dyck banndh to plot 3651 |
Completion of work |
-
latitude : 21.651055407710373,21.651035374961793
Longitude : 87.61403870768845,87.61404926888645
file name : Image_30012022080931350.png
|
2022-01-30 08:09:31.407307 |
105 |
33331031 |
CFC Concreet Rd at Jaldha from Sea dyck banndh to plot 365 |
200000 |
CFC Concreet Rd at Jaldha from Sea dyck banndh to plot 3651 |
Completion of work |
-
latitude : 21.6497637,21.6497637,21.6497637
Longitude : 87.6128185,87.6128185,87.6128185
file name : Image_30012022081006566.png
|
2022-01-30 08:10:06.624026 |
106 |
38962574 |
CFC Sinking of Submarsel Pump at Jaldha near Subhas Jana |
200000 |
CFC Sinking of Submarsel Pump at Jaldha near Subhas Jana1 |
Completion of work |
-
latitude : 21.6458950471133
Longitude : 87.60657043196261
file name : Image_02032022171948330.png
|
2022-03-02 17:19:48.418234 |
107 |
38962574 |
CFC Sinking of Submarsel Pump at Jaldha near Subhas Jana |
200000 |
CFC Sinking of Submarsel Pump at Jaldha near Subhas Jana1 |
Completion of work |
-
latitude : 21.64591780398041
Longitude : 87.60658090934157
file name : Image_02032022172031542.png
|
2022-03-02 17:20:31.622141 |
108 |
38962574 |
CFC Sinking of Submarsel Pump at Jaldha near Subhas Jana |
200000 |
CFC Sinking of Submarsel Pump at Jaldha near Subhas Jana1 |
Completion of work |
-
latitude : 21.645916127599776
Longitude : 87.60653740726411
file name : Image_02032022172111113.png
|
2022-03-02 17:21:11.194096 |
109 |
38962341 |
CFC Pacca Drain at Bodhra from Satyasundar Patra Res to Gobinda Sau land |
150000 |
CFC Pacca Drain at Bodhra from Satyasundar Patra Res to Gobinda Sau land1 |
Completion of work |
-
latitude : 21.65774366352707
Longitude : 87.58506984449923
file name : Image_09032022135358454.png
|
2022-03-09 13:53:58.588584 |
110 |
38962341 |
CFC Pacca Drain at Bodhra from Satyasundar Patra Res to Gobinda Sau land |
150000 |
CFC Pacca Drain at Bodhra from Satyasundar Patra Res to Gobinda Sau land1 |
Completion of work |
-
latitude : 21.657667052932084
Longitude : 87.58509825915098
file name : Image_09032022135447903.png
|
2022-03-09 13:54:48.010221 |
111 |
38962341 |
CFC Pacca Drain at Bodhra from Satyasundar Patra Res to Gobinda Sau land |
150000 |
CFC Pacca Drain at Bodhra from Satyasundar Patra Res to Gobinda Sau land1 |
Completion of work |
-
latitude : 21.657707998529077
Longitude : 87.58505157195032
file name : Image_09032022135531513.png
|
2022-03-09 13:55:31.615104 |
112 |
38962318 |
CFC Pacca Drain at Bodhra from Rahakanta Chanda Res to Saktipada Jana |
150000 |
CFC Pacca Drain at Bodhra from Rahakanta Chanda Res to Saktipada Jana1 |
Completion of work |
-
latitude : 21.65883745998144
Longitude : 87.58792304433882
file name : Image_09032022134638223.png
|
2022-03-09 13:46:38.345404 |
113 |
38962318 |
CFC Pacca Drain at Bodhra from Rahakanta Chanda Res to Saktipada Jana |
150000 |
CFC Pacca Drain at Bodhra from Rahakanta Chanda Res to Saktipada Jana1 |
Completion of work |
-
latitude : 21.65886306669563
Longitude : 87.58796696551144
file name : Image_09032022134751618.png
|
2022-03-09 13:47:51.714887 |
114 |
38962318 |
CFC Pacca Drain at Bodhra from Rahakanta Chanda Res to Saktipada Jana |
150000 |
CFC Pacca Drain at Bodhra from Rahakanta Chanda Res to Saktipada Jana1 |
Completion of work |
-
latitude : 21.65889139752835
Longitude : 87.58794626221061
file name : Image_09032022134835004.png
|
2022-03-09 13:48:35.101358 |
115 |
33408401 |
CFC Concreet rd at Gopalpur Achintya Roy to Ananta Roy |
100000 |
CFC Concreet rd at Gopalpur Achintya Roy to Ananta Roy1 |
Completion of work |
-
latitude : 21.664148066192865,21.664148066192865
Longitude : 87.54815711639822,87.54815711639822
file name : Image_09032022141855482.png
|
2022-03-09 14:18:55.560109 |
116 |
33408401 |
CFC Concreet rd at Gopalpur Achintya Roy to Ananta Roy |
100000 |
CFC Concreet rd at Gopalpur Achintya Roy to Ananta Roy1 |
Completion of work |
-
latitude : 21.664148066192865,21.664148066192865
Longitude : 87.54815711639822,87.54815711639822
file name : Image_09032022141939249.png
|
2022-03-09 14:19:39.322968 |
117 |
33408401 |
CFC Concreet rd at Gopalpur Achintya Roy to Ananta Roy |
100000 |
CFC Concreet rd at Gopalpur Achintya Roy to Ananta Roy1 |
Completion of work |
-
latitude : 21.664148066192865,21.664148066192865
Longitude : 87.54815711639822,87.54815711639822
file name : Image_09032022142020265.png
|
2022-03-09 14:20:20.338899 |
118 |
38962840 |
CFC Sinking of Submarsel Pump at Chandpur near Asoke Pradhan |
200000 |
CFC Sinking of Submarsel Pump at Chandpur near Asoke Pradhan 1 |
Completion of work |
-
latitude : 21.64351399987936
Longitude : 87.59880820289254
file name : Image_09032022150117263.png
|
2022-03-09 15:01:17.35007 |
119 |
38962840 |
CFC Sinking of Submarsel Pump at Chandpur near Asoke Pradhan |
200000 |
CFC Sinking of Submarsel Pump at Chandpur near Asoke Pradhan 1 |
Completion of work |
-
latitude : 21.643540989607573
Longitude : 87.59874936193228
file name : Image_09032022150157064.png
|
2022-03-09 15:01:57.131873 |
120 |
38962840 |
CFC Sinking of Submarsel Pump at Chandpur near Asoke Pradhan |
200000 |
CFC Sinking of Submarsel Pump at Chandpur near Asoke Pradhan 1 |
Completion of work |
-
latitude : 21.643478460609913
Longitude : 87.59879043325782
file name : Image_09032022150232936.png
|
2022-03-09 15:02:33.007387 |
121 |
33410545 |
CFC Concreet rd at Kshirpal Sasanka Pahari to Laxmikanta Manda |
200000 |
CFC Concreet rd at Kshirpal Sasanka Pahari to Laxmikanta Manda1 |
Completion of work |
-
latitude : 21.654425687156618,21.654434194788337,21.654434194788337
Longitude : 87.5991368573159,87.59912386536598,87.59912386536598
file name : Image_11032022140551618.png
|
2022-03-11 14:05:51.691667 |
122 |
33410545 |
CFC Concreet rd at Kshirpal Sasanka Pahari to Laxmikanta Manda |
200000 |
CFC Concreet rd at Kshirpal Sasanka Pahari to Laxmikanta Manda1 |
Completion of work |
-
latitude : 21.65443750564009,21.654439978301525,21.65443951729685
Longitude : 87.59916527196765,87.59915110655129,87.59914842434227
file name : Image_11032022140631249.png
|
2022-03-11 14:06:31.33193 |
123 |
33410545 |
CFC Concreet rd at Kshirpal Sasanka Pahari to Laxmikanta Manda |
200000 |
CFC Concreet rd at Kshirpal Sasanka Pahari to Laxmikanta Manda1 |
Completion of work |
-
latitude : 21.654421663843095,21.654387591406703,21.654421412386
Longitude : 87.59910617955029,87.59907885454595,87.59907298721373
file name : Image_11032022140708334.png
|
2022-03-11 14:07:08.396665 |
124 |
33328838 |
CFC Concreet Rd at Dublabari Bablu Das to Mukundanath Bera |
100000 |
CFC Concreet Rd at Dublabari Bablu Das to Mukundanath Bera1 |
Completion of work |
-
latitude : 21.66991556994617,21.66991556994617,21.66991556994617
Longitude : 87.60255390778184,87.60255390778184,87.60255390778184
file name : Image_11032022142314493.png
|
2022-03-11 14:23:14.567734 |
125 |
33328838 |
CFC Concreet Rd at Dublabari Bablu Das to Mukundanath Bera |
100000 |
CFC Concreet Rd at Dublabari Bablu Das to Mukundanath Bera1 |
Completion of work |
-
latitude : 21.66990978643298,21.66990978643298,21.66990978643298
Longitude : 87.60255172848701,87.60255172848701,87.60255172848701
file name : Image_11032022142435426.png
|
2022-03-11 14:24:35.504955 |
126 |
33328838 |
CFC Concreet Rd at Dublabari Bablu Das to Mukundanath Bera |
100000 |
CFC Concreet Rd at Dublabari Bablu Das to Mukundanath Bera1 |
Completion of work |
-
latitude : 21.669900440610945,21.66990119498223,21.669902536086738
Longitude : 87.60252876207232,87.60253018699586,87.60253253392875
file name : Image_11032022142140064.png
|
2022-03-11 14:21:40.160326 |
127 |
38962803 |
CFC Pacca Drain at Shankarpur from Subhas Nayak res to Main Rd |
380000 |
CFC Pacca Drain at Shankarpur from Subhas Nayak res to Main Rd1 |
Completion of work |
-
latitude : 21.647404921241105
Longitude : 87.57225492037833
file name : Image_24032022142148695.png
|
2022-03-24 14:21:48.792952 |
128 |
38962803 |
CFC Pacca Drain at Shankarpur from Subhas Nayak res to Main Rd |
380000 |
CFC Pacca Drain at Shankarpur from Subhas Nayak res to Main Rd1 |
Completion of work |
-
latitude : 21.647363305091858
Longitude : 87.57225181907415
file name : Image_24032022142229100.png
|
2022-03-24 14:22:29.167093 |
129 |
38962803 |
CFC Pacca Drain at Shankarpur from Subhas Nayak res to Main Rd |
380000 |
CFC Pacca Drain at Shankarpur from Subhas Nayak res to Main Rd1 |
Completion of work |
-
latitude : 21.647383840754628
Longitude : 87.5723032001406
file name : Image_24032022142305420.png
|
2022-03-24 14:23:05.490185 |
130 |
33397948 |
CFC Concreet Rd at Kuiliatta Tiris Fukar to Aswini Garu |
100000 |
CFC Concreet Rd at Kuiliatta Tiris Fukar to Aswini Garu1 |
Completion of work |
-
latitude : 21.662565185688436,21.662565185688436,21.662565185688436
Longitude : 87.5704862549901,87.5704862549901,87.5704862549901
file name : Image_24032022132317661.png
|
2022-03-24 13:23:17.736702 |
131 |
33397948 |
CFC Concreet Rd at Kuiliatta Tiris Fukar to Aswini Garu |
100000 |
CFC Concreet Rd at Kuiliatta Tiris Fukar to Aswini Garu1 |
Completion of work |
-
latitude : 21.662565185688436,21.662565185688436,21.662565185688436
Longitude : 87.5704862549901,87.5704862549901,87.5704862549901
file name : Image_24032022132415424.png
|
2022-03-24 13:24:15.494289 |
132 |
33397948 |
CFC Concreet Rd at Kuiliatta Tiris Fukar to Aswini Garu |
100000 |
CFC Concreet Rd at Kuiliatta Tiris Fukar to Aswini Garu1 |
Completion of work |
-
latitude : 21.662565185688436,21.662565185688436,21.662565185688436
Longitude : 87.5704862549901,87.5704862549901,87.5704862549901
file name : Image_24032022132452261.png
|
2022-03-24 13:24:52.327951 |
133 |
33407192 |
CFC pacca drain at tajpur Nayan Latua to Chandrasekhar |
200000 |
CFC pacca drain at tajpur Nayan Latua to Chandrasekhar1 |
Completion of work |
-
latitude : 21.655356413684785,21.655356413684785,21.655345810577273
Longitude : 87.62344932183623,87.62344932183623,87.62350296601653
file name : Image_24032022103211306.png
|
2022-03-24 10:32:11.388412 |
134 |
33407192 |
CFC pacca drain at tajpur Nayan Latua to Chandrasekhar |
200000 |
CFC pacca drain at tajpur Nayan Latua to Chandrasekhar1 |
Completion of work |
-
latitude : 21.65532984305173,21.65533068124205,21.65533068124205,21.655324227176607
Longitude : 87.62355568818748,87.62354361824691,87.62354361824691,87.62351746670902
file name : Image_24032022103252275.png
|
2022-03-24 10:32:52.351981 |
135 |
33407192 |
CFC pacca drain at tajpur Nayan Latua to Chandrasekhar |
200000 |
CFC pacca drain at tajpur Nayan Latua to Chandrasekhar1 |
Completion of work |
-
latitude : 21.655351342633367,21.65537083055824,21.65537083055824,21.65537083055824
Longitude : 87.62351109646261,87.62353372760117,87.62353372760117,87.62353372760117
file name : Image_24032022103331898.png
|
2022-03-24 10:33:31.97669 |
136 |
33318482 |
CFC Concreet rd at Chandpur Parameswar Das to Sudhir Patra |
100000 |
CFC Concreet rd at Chandpur Parameswar Das to Sudhir Patra1 |
Completion of work |
-
latitude : 21.646221270784736,21.646221270784736,21.6462195944041
Longitude : 87.60488340631127,87.60488340631127,87.60485381819308
file name : Image_24032022120857070.png
|
2022-03-24 12:08:57.136715 |
137 |
33318482 |
CFC Concreet rd at Chandpur Parameswar Das to Sudhir Patra |
100000 |
CFC Concreet rd at Chandpur Parameswar Das to Sudhir Patra1 |
Completion of work |
-
latitude : 21.64624105207622,21.64624105207622
Longitude : 87.60492120869458,87.60492120869458
file name : Image_24032022120929380.png
|
2022-03-24 12:09:29.443914 |
138 |
33318482 |
CFC Concreet rd at Chandpur Parameswar Das to Sudhir Patra |
100000 |
CFC Concreet rd at Chandpur Parameswar Das to Sudhir Patra1 |
Completion of work |
-
latitude : 21.646217037923634,21.646217037923634,21.646222108975053
Longitude : 87.60487401857972,87.60487401857972,87.60485348291695
file name : Image_24032022121000016.png
|
2022-03-24 12:10:00.089556 |
139 |
33322317 |
CFC Pailling at Tengramari in Ardhenduu Dattas pukur parh |
150000 |
CFC Pailling at Tengramari in Ardhenduu Dattas pukur parh1 |
Completion of work |
-
latitude : 21.6573752
Longitude : 87.5922304
file name : Image_02052022122253348.png
|
2022-05-02 12:22:53.479725 |
140 |
33322317 |
CFC Pailling at Tengramari in Ardhenduu Dattas pukur parh |
150000 |
CFC Pailling at Tengramari in Ardhenduu Dattas pukur parh1 |
Completion of work |
-
latitude : 21.6573658
Longitude : 87.5922329
file name : Image_02052022122343592.png
|
2022-05-02 12:23:43.68065 |
141 |
33322317 |
CFC Pailling at Tengramari in Ardhenduu Dattas pukur parh |
150000 |
CFC Pailling at Tengramari in Ardhenduu Dattas pukur parh1 |
Completion of work |
-
latitude : 21.6573658
Longitude : 87.592234
file name : Image_02052022122436070.png
|
2022-05-02 12:24:36.155822 |
142 |
33327931 |
CFC Const of Multipurpose Building at Bahadurpur near Samajbari |
300000 |
CFC Const of Multipurpose Building at Bahadurpur near Samajbari 1 |
Completion of work |
-
latitude : 21.651928802020848
Longitude : 87.5520211737603
file name : Image_10052022133434638.png
|
2022-05-10 13:34:34.748114 |
143 |
33327931 |
CFC Const of Multipurpose Building at Bahadurpur near Samajbari |
300000 |
CFC Const of Multipurpose Building at Bahadurpur near Samajbari 1 |
Completion of work |
-
latitude : 21.65195365436375
Longitude : 87.5520378537476
file name : Image_10052022133518457.png
|
2022-05-10 13:35:18.541931 |
144 |
33327931 |
CFC Const of Multipurpose Building at Bahadurpur near Samajbari |
300000 |
CFC Const of Multipurpose Building at Bahadurpur near Samajbari 1 |
Completion of work |
-
latitude : 21.651869039051235
Longitude : 87.55201111547649
file name : Image_10052022133604197.png
|
2022-05-10 13:36:04.295877 |
145 |
38962937 |
CFC Pacca Drain at Chandpur from Arun Jana res to Aswini Pradhan |
150000 |
CFC Pacca Drain at Chandpur from Arun Jana res to Aswini Pradhan1 |
Completion of work |
-
latitude : 21.647453333333335
Longitude : 87.59554833333335
file name : Image_02062022130401359.png
|
2022-06-02 13:04:01.459397 |
146 |
38962937 |
CFC Pacca Drain at Chandpur from Arun Jana res to Aswini Pradhan |
150000 |
CFC Pacca Drain at Chandpur from Arun Jana res to Aswini Pradhan1 |
Completion of work |
-
latitude : 21.647431666666662
Longitude : 87.59553666666667
file name : Image_02062022130455496.png
|
2022-06-02 13:04:55.602447 |
147 |
38962937 |
CFC Pacca Drain at Chandpur from Arun Jana res to Aswini Pradhan |
150000 |
CFC Pacca Drain at Chandpur from Arun Jana res to Aswini Pradhan1 |
Completion of work |
-
latitude : 21.64744333333333
Longitude : 87.59551833333335
file name : Image_02062022130545084.png
|
2022-06-02 13:05:45.182654 |
148 |
38962429 |
CFC Pacca Drain at Gopalpur from PMAY Rd to Apurba Payra |
100000 |
CFC Pacca Drain at Gopalpur from PMAY Rd to Apurba Payra 1 |
Completion of work |
-
latitude : 21.6566014
Longitude : 87.5973742
file name : Image_02062022135153046.png
|
2022-06-02 13:51:53.151808 |
149 |
38962429 |
CFC Pacca Drain at Gopalpur from PMAY Rd to Apurba Payra |
100000 |
CFC Pacca Drain at Gopalpur from PMAY Rd to Apurba Payra 1 |
Completion of work |
-
latitude : 21.6566014
Longitude : 87.5973742
file name : Image_02062022135242686.png
|
2022-06-02 13:52:42.799559 |
150 |
38962429 |
CFC Pacca Drain at Gopalpur from PMAY Rd to Apurba Payra |
100000 |
CFC Pacca Drain at Gopalpur from PMAY Rd to Apurba Payra 1 |
Completion of work |
-
latitude : 21.6566014
Longitude : 87.5973742
file name : Image_02062022135334977.png
|
2022-06-02 13:53:35.088819 |
151 |
33327128 |
CFC Concreet Rd at Jamra Shyampur Siddheswar Panda to Pradip Panda |
100000 |
CFC Concreet Rd at Jamra Shyampur Siddheswar Panda to Pradip Panda1 |
Completion of work |
-
latitude : 21.64032166666667,21.640319999999996
Longitude : 87.58684833333334,87.58684333333333
file name : Image_03062022123633052.png
|
2022-06-03 12:36:33.177687 |
152 |
33327128 |
CFC Concreet Rd at Jamra Shyampur Siddheswar Panda to Pradip Panda |
100000 |
CFC Concreet Rd at Jamra Shyampur Siddheswar Panda to Pradip Panda1 |
Completion of work |
-
latitude : 21.640300000000003,21.640289999999997
Longitude : 87.58685666666666,87.58686166666666
file name : Image_03062022123719664.png
|
2022-06-03 12:37:19.77429 |
153 |
33327128 |
CFC Concreet Rd at Jamra Shyampur Siddheswar Panda to Pradip Panda |
100000 |
CFC Concreet Rd at Jamra Shyampur Siddheswar Panda to Pradip Panda1 |
Completion of work |
-
latitude : 21.640308333333337,21.64032333333334
Longitude : 87.58683666666666,87.58684999999998
file name : Image_03062022123758395.png
|
2022-06-03 12:37:58.506952 |
154 |
33407663 |
CFC Brick Soiling at Bodhra at Bodhra Play Ground |
100000 |
CFC Brick Soiling at Bodhra at Bodhra Play Ground1 |
Completion of work |
-
latitude : 21.658646666666662,21.658649999999998
Longitude : 87.58679166666667,87.58680833333334
file name : Image_03062022121951100.png
|
2022-06-03 12:19:51.198715 |
155 |
33407663 |
CFC Brick Soiling at Bodhra at Bodhra Play Ground |
100000 |
CFC Brick Soiling at Bodhra at Bodhra Play Ground1 |
Completion of work |
-
latitude : 21.65864,21.658633333333334
Longitude : 87.58679666666667,87.58678666666668
file name : Image_03062022122054773.png
|
2022-06-03 12:20:54.874507 |
156 |
33407663 |
CFC Brick Soiling at Bodhra at Bodhra Play Ground |
100000 |
CFC Brick Soiling at Bodhra at Bodhra Play Ground1 |
Completion of work |
-
latitude : 21.658603333333335,21.658604999999998
Longitude : 87.58681999999999,87.58681833333334
file name : Image_03062022122144389.png
|
2022-06-03 12:21:44.502342 |
157 |
33327232 |
CFC Concreet Rd at Lachhimpur Laxman Jana to Murari Das |
100000 |
CFC Concreet Rd at Lachhimpur Laxman Jana to Murari Das1 |
Completion of work |
-
latitude : 21.641493333333333,21.641484999999996
Longitude : 87.58343833333332,87.58345166666668
file name : Image_03062022124305217.png
|
2022-06-03 12:43:05.326364 |
158 |
33327232 |
CFC Concreet Rd at Lachhimpur Laxman Jana to Murari Das |
100000 |
CFC Concreet Rd at Lachhimpur Laxman Jana to Murari Das1 |
Completion of work |
-
latitude : 21.64152166666667,21.641513333333332
Longitude : 87.58345,87.58344666666666
file name : Image_03062022124400289.png
|
2022-06-03 12:44:00.405052 |
159 |
33327232 |
CFC Concreet Rd at Lachhimpur Laxman Jana to Murari Das |
100000 |
CFC Concreet Rd at Lachhimpur Laxman Jana to Murari Das1 |
Completion of work |
-
latitude : 21.641525,21.64151
Longitude : 87.58344666666666,87.58343333333332
file name : Image_03062022124445393.png
|
2022-06-03 12:44:45.503855 |
160 |
33408864 |
CFC Pailling at Deulbatta in Hari Patra Pukur Parh |
100000 |
CFC Pailling at Deulbatta in Hari Patra Pukur Parh1 |
Completion of work |
-
latitude : 21.664111666666667
Longitude : 87.55413333333333
file name : Image_22062022154321682.png
|
2022-06-22 15:43:21.804633 |
161 |
33408864 |
CFC Pailling at Deulbatta in Hari Patra Pukur Parh |
100000 |
CFC Pailling at Deulbatta in Hari Patra Pukur Parh1 |
Completion of work |
-
latitude : 21.664138333333334
Longitude : 87.55414999999999
file name : Image_22062022154424632.png
|
2022-06-22 15:44:24.751679 |
162 |
33408864 |
CFC Pailling at Deulbatta in Hari Patra Pukur Parh |
100000 |
CFC Pailling at Deulbatta in Hari Patra Pukur Parh1 |
Completion of work |
-
latitude : 21.66408666666667
Longitude : 87.55413166666668
file name : Image_22062022154510696.png
|
2022-06-22 15:45:10.80857 |
163 |
33407092 |
CFC Boundary Wall at Tajpur of Tajpur SSK |
100000 |
CFC Boundary Wall at Tajpur of Tajpur SSK1 |
Completion of work |
-
latitude : 21.653833333333335
Longitude : 87.62534666666667
file name : Image_22062022135512851.png
|
2022-06-22 13:55:12.974755 |
164 |
33407092 |
CFC Boundary Wall at Tajpur of Tajpur SSK |
100000 |
CFC Boundary Wall at Tajpur of Tajpur SSK1 |
Completion of work |
-
latitude : 21.653801666666663
Longitude : 87.625305
file name : Image_22062022135615443.png
|
2022-06-22 13:56:15.566513 |
165 |
33407092 |
CFC Boundary Wall at Tajpur of Tajpur SSK |
100000 |
CFC Boundary Wall at Tajpur of Tajpur SSK1 |
Completion of work |
-
latitude : 21.653821666666666
Longitude : 87.62535000000001
file name : Image_22062022135700038.png
|
2022-06-22 13:57:00.184834 |
166 |
38962897 |
CFC Pacca Drain at Chandpur from Jhaukhana to Patitpaban Bhunia |
150000 |
CFC Pacca Drain at Chandpur from Jhaukhana to Patitpaban Bhunia1 |
Completion of work |
-
latitude : 21.64353833333333
Longitude : 87.593965
file name : Image_22062022162530025.png
|
2022-06-22 16:25:30.131751 |
167 |
38962897 |
CFC Pacca Drain at Chandpur from Jhaukhana to Patitpaban Bhunia |
150000 |
CFC Pacca Drain at Chandpur from Jhaukhana to Patitpaban Bhunia1 |
Completion of work |
-
latitude : 21.643561666666663
Longitude : 87.59395333333332
file name : Image_22062022162533698.png
|
2022-06-22 16:25:33.81332 |
168 |
38962897 |
CFC Pacca Drain at Chandpur from Jhaukhana to Patitpaban Bhunia |
150000 |
CFC Pacca Drain at Chandpur from Jhaukhana to Patitpaban Bhunia1 |
Completion of work |
-
latitude : 21.64353833333333
Longitude : 87.59390166666665
file name : Image_22062022162623597.png
|
2022-06-22 16:26:23.720993 |
169 |
38962897 |
CFC Pacca Drain at Chandpur from Jhaukhana to Patitpaban Bhunia |
150000 |
CFC Pacca Drain at Chandpur from Jhaukhana to Patitpaban Bhunia1 |
Completion of work |
-
latitude : 21.643551666666667
Longitude : 87.59390666666668
file name : Image_22062022162752771.png
|
2022-06-22 16:27:52.889312 |
170 |
38962465 |
CFC Pacca Drain at Bherichauli from Biren Sau res to Madhusudan Haldar |
175894 |
CFC Pacca Drain at Bherichauli from Biren Sau res to Madhusudan Haldar1 |
Completion of work |
-
latitude : 21.655626666666663
Longitude : 87.60512666666666
file name : Image_27062022064248872.png
|
2022-06-27 06:42:48.99195 |
171 |
38962465 |
CFC Pacca Drain at Bherichauli from Biren Sau res to Madhusudan Haldar |
175894 |
CFC Pacca Drain at Bherichauli from Biren Sau res to Madhusudan Haldar1 |
Completion of work |
-
latitude : 21.655641666666664
Longitude : 87.60513666666665
file name : Image_27062022065020541.png
|
2022-06-27 06:50:20.642727 |
172 |
38962465 |
CFC Pacca Drain at Bherichauli from Biren Sau res to Madhusudan Haldar |
175894 |
CFC Pacca Drain at Bherichauli from Biren Sau res to Madhusudan Haldar1 |
Completion of work |
-
latitude : 21.655644999999996
Longitude : 87.60513333333334
file name : Image_27062022065030769.png
|
2022-06-27 06:50:30.875712 |
173 |
38962465 |
CFC Pacca Drain at Bherichauli from Biren Sau res to Madhusudan Haldar |
175894 |
CFC Pacca Drain at Bherichauli from Biren Sau res to Madhusudan Haldar1 |
Completion of work |
-
latitude : 21.655651666666667
Longitude : 87.60509666666667
file name : Image_27062022065039668.png
|
2022-06-27 06:50:39.777112 |
174 |
38962465 |
CFC Pacca Drain at Bherichauli from Biren Sau res to Madhusudan Haldar |
175894 |
CFC Pacca Drain at Bherichauli from Biren Sau res to Madhusudan Haldar1 |
Completion of work |
-
latitude : 21.655651666666667
Longitude : 87.60506833333332
file name : Image_27062022065123187.png
|
2022-06-27 06:51:23.295488 |
175 |
38962465 |
CFC Pacca Drain at Bherichauli from Biren Sau res to Madhusudan Haldar |
175894 |
CFC Pacca Drain at Bherichauli from Biren Sau res to Madhusudan Haldar1 |
Completion of work |
-
latitude : 21.65562333333333
Longitude : 87.60505833333333
file name : Image_27062022071148413.png
|
2022-06-27 07:11:48.517812 |
176 |
38962374 |
CFC Sinking of Submarsel Pump at Lachhimpur near Mahadeb Mandir |
250000 |
CFC Sinking of Submarsel Pump at Lachhimpur near Mahadeb Mandir 1 |
Completion of work |
-
latitude : 21.64092333333333
Longitude : 87.58311499999999
file name : Image_27062022071151601.png
|
2022-06-27 07:11:51.67739 |
177 |
38962374 |
CFC Sinking of Submarsel Pump at Lachhimpur near Mahadeb Mandir |
250000 |
CFC Sinking of Submarsel Pump at Lachhimpur near Mahadeb Mandir 1 |
Completion of work |
-
latitude : 21.640946666666665
Longitude : 87.58312
file name : Image_27062022071237567.png
|
2022-06-27 07:12:37.642862 |
178 |
38962374 |
CFC Sinking of Submarsel Pump at Lachhimpur near Mahadeb Mandir |
250000 |
CFC Sinking of Submarsel Pump at Lachhimpur near Mahadeb Mandir 1 |
Completion of work |
-
latitude : 21.64092666666666
Longitude : 87.58312499999998
file name : Image_27062022071319782.png
|
2022-06-27 07:13:19.86251 |
179 |
46612005 |
15T Sinking of Submarsel Pump at Bodhra near Ananta Shit res JL 234 Plot 112 |
250000 |
15T Sinking of Submarsel Pump at Bodhra near Ananta Shit res JL 234 Plot 112 1 |
Completion of work |
-
latitude : 21.65945166666667
Longitude : 87.58257499999999
file name : Image_29062022095218626.png
|
2022-06-29 09:52:18.759351 |
180 |
46612005 |
15T Sinking of Submarsel Pump at Bodhra near Ananta Shit res JL 234 Plot 112 |
250000 |
15T Sinking of Submarsel Pump at Bodhra near Ananta Shit res JL 234 Plot 112 1 |
Completion of work |
-
latitude : 21.659441666666666
Longitude : 87.58254833333334
file name : Image_29062022095313320.png
|
2022-06-29 09:53:13.442 |
181 |
46612005 |
15T Sinking of Submarsel Pump at Bodhra near Ananta Shit res JL 234 Plot 112 |
250000 |
15T Sinking of Submarsel Pump at Bodhra near Ananta Shit res JL 234 Plot 112 1 |
Completion of work |
-
latitude : 21.65945333333333
Longitude : 87.58257833333333
file name : Image_29062022095348616.png
|
2022-06-29 09:53:48.748403 |
182 |
46611855 |
15T Sinking of Submarsel Pump at Tengramari near Seheb Pukur Bimal Dey res JL 235 Plot 1197 |
250000 |
15T Sinking of Submarsel Pump at Tengramari near Seheb Pukur Bimal Dey res JL 235 Plot 11971 |
Completion of work |
-
latitude : 21.651384999999998
Longitude : 87.58859333333334
file name : Image_29062022100210650.png
|
2022-06-29 10:02:10.733894 |
183 |
46611855 |
15T Sinking of Submarsel Pump at Tengramari near Seheb Pukur Bimal Dey res JL 235 Plot 1197 |
250000 |
15T Sinking of Submarsel Pump at Tengramari near Seheb Pukur Bimal Dey res JL 235 Plot 11971 |
Completion of work |
-
latitude : 21.651414999999997
Longitude : 87.58859499999998
file name : Image_29062022100246116.png
|
2022-06-29 10:02:46.194812 |
184 |
46611855 |
15T Sinking of Submarsel Pump at Tengramari near Seheb Pukur Bimal Dey res JL 235 Plot 1197 |
250000 |
15T Sinking of Submarsel Pump at Tengramari near Seheb Pukur Bimal Dey res JL 235 Plot 11971 |
Completion of work |
-
latitude : 21.651419999999998
Longitude : 87.58856166666668
file name : Image_29062022100324661.png
|
2022-06-29 10:03:24.746734 |
185 |
46612532 |
15T Sinking of Submarsel Pump at Tajpur Purusottam Majhi res JL 244 Plot 181 |
250000 |
15T Sinking of Submarsel Pump at Tajpur Purusottam Majhi res JL 244 Plot 181 1 |
Completion of work |
-
latitude : 21.65299166666667
Longitude : 87.628705
file name : Image_05072022112401139.png
|
2022-07-05 11:24:01.258463 |
186 |
46612532 |
15T Sinking of Submarsel Pump at Tajpur Purusottam Majhi res JL 244 Plot 181 |
250000 |
15T Sinking of Submarsel Pump at Tajpur Purusottam Majhi res JL 244 Plot 181 1 |
Completion of work |
-
latitude : 21.653031666666667
Longitude : 87.62872
file name : Image_05072022112503890.png
|
2022-07-05 11:25:04.020476 |
187 |
46612532 |
15T Sinking of Submarsel Pump at Tajpur Purusottam Majhi res JL 244 Plot 181 |
250000 |
15T Sinking of Submarsel Pump at Tajpur Purusottam Majhi res JL 244 Plot 181 1 |
Completion of work |
-
latitude : 21.653025000000003
Longitude : 87.62872
file name : Image_05072022112546323.png
|
2022-07-05 11:25:46.444993 |
188 |
46587025 |
15U Concreet Rd at Bodhra from Hemanta Patra res to Radhakanta Chanda res GS No 3 JL NO 234 Plot |
100000 |
15U Concreet Rd at Bodhra from Hemanta Patra res to Radhakanta Chanda res GS No 3 JL NO 234 Plot 1 |
Completion of work |
-
latitude : 21.65841833333333,21.658428333333337,21.658426666666667
Longitude : 87.58808666666667,87.58808833333333,87.58808666666667
file name : Image_05072022133502478.png
|
2022-07-05 13:35:02.585256 |
189 |
46587025 |
15U Concreet Rd at Bodhra from Hemanta Patra res to Radhakanta Chanda res GS No 3 JL NO 234 Plot |
100000 |
15U Concreet Rd at Bodhra from Hemanta Patra res to Radhakanta Chanda res GS No 3 JL NO 234 Plot 1 |
Completion of work |
-
latitude : 21.65837333333333,21.658368333333335
Longitude : 87.58807666666668,87.58807666666668
file name : Image_05072022133542360.png
|
2022-07-05 13:35:42.46172 |
190 |
46587025 |
15U Concreet Rd at Bodhra from Hemanta Patra res to Radhakanta Chanda res GS No 3 JL NO 234 Plot |
100000 |
15U Concreet Rd at Bodhra from Hemanta Patra res to Radhakanta Chanda res GS No 3 JL NO 234 Plot 1 |
Completion of work |
-
latitude : 21.658428333333337,21.658428333333337,21.65843166666667
Longitude : 87.58809000000001,87.58808666666667,87.58808666666667
file name : Image_05072022133623557.png
|
2022-07-05 13:36:23.662344 |
191 |
46563452 |
15U Concreet Rd at Jhaugeria from Kalpana Mandal res to Basudeb Mandal res GS No 2 JL NO 207 Plo |
100000 |
15U Concreet Rd at Jhaugeria from Kalpana Mandal res to Basudeb Mandal res GS No 2 JL NO 207 Plo1 |
Completion of work |
-
latitude : 21.65214166666666,21.652145000000004
Longitude : 87.55843166666666,87.55843666666667
file name : Image_05072022135742036.png
|
2022-07-05 13:57:42.168275 |
192 |
46563452 |
15U Concreet Rd at Jhaugeria from Kalpana Mandal res to Basudeb Mandal res GS No 2 JL NO 207 Plo |
100000 |
15U Concreet Rd at Jhaugeria from Kalpana Mandal res to Basudeb Mandal res GS No 2 JL NO 207 Plo1 |
Completion of work |
-
latitude : 21.652128333333334,21.652133333333335,21.652134999999998
Longitude : 87.55841666666666,87.55841666666666,87.55841333333335
file name : Image_05072022135818513.png
|
2022-07-05 13:58:18.645495 |
193 |
46563452 |
15U Concreet Rd at Jhaugeria from Kalpana Mandal res to Basudeb Mandal res GS No 2 JL NO 207 Plo |
100000 |
15U Concreet Rd at Jhaugeria from Kalpana Mandal res to Basudeb Mandal res GS No 2 JL NO 207 Plo1 |
Completion of work |
-
latitude : 21.65237666666667,21.652368333333335,21.652356666666666
Longitude : 87.55830499999999,87.55831000000002,87.55831666666667
file name : Image_05072022135858182.png
|
2022-07-05 13:58:58.318551 |
194 |
46587213 |
15U Concreet Rd at Bodhra from Gourmohan Giri res to Sukumar Giri res GS No 3 JL NO 234 Plot Goa |
100000 |
15U Concreet Rd at Bodhra from Gourmohan Giri res to Sukumar Giri res GS No 3 JL NO 234 Plot Goa1 |
Completion of work |
-
latitude : 21.650555,21.650558333333333
Longitude : 87.58782666666666,87.58783
file name : Image_26072022141256611.png
|
2022-07-26 14:12:56.707647 |
195 |
46587213 |
15U Concreet Rd at Bodhra from Gourmohan Giri res to Sukumar Giri res GS No 3 JL NO 234 Plot Goa |
100000 |
15U Concreet Rd at Bodhra from Gourmohan Giri res to Sukumar Giri res GS No 3 JL NO 234 Plot Goa1 |
Completion of work |
-
latitude : 21.650530000000003,21.650531666666666
Longitude : 87.58782833333335,87.58783
file name : Image_26072022141340674.png
|
2022-07-26 14:13:40.766792 |
196 |
46587213 |
15U Concreet Rd at Bodhra from Gourmohan Giri res to Sukumar Giri res GS No 3 JL NO 234 Plot Goa |
100000 |
15U Concreet Rd at Bodhra from Gourmohan Giri res to Sukumar Giri res GS No 3 JL NO 234 Plot Goa1 |
Completion of work |
-
latitude : 21.650533333333335,21.650536666666667
Longitude : 87.58780666666668,87.587795
file name : Image_26072022141435588.png
|
2022-07-26 14:14:35.683172 |
197 |
46591300 |
15T Sinking of Submarsel Pump at Jamra Shyampur near Himangshu Jana res JL 218 Plot 321 |
225000 |
15T Sinking of Submarsel Pump at Jamra Shyampur near Himangshu Jana res JL 218 Plot 3211 |
Completion of work |
-
latitude : 21.640053333333338
Longitude : 87.58524000000001
file name : Image_19092022135101974.png
|
2022-09-19 13:51:02.125263 |
198 |
46591300 |
15T Sinking of Submarsel Pump at Jamra Shyampur near Himangshu Jana res JL 218 Plot 321 |
225000 |
15T Sinking of Submarsel Pump at Jamra Shyampur near Himangshu Jana res JL 218 Plot 3211 |
Completion of work |
-
latitude : 21.640038333333337
Longitude : 87.58526166666667
file name : Image_19092022135335624.png
|
2022-09-19 13:53:35.751373 |
199 |
46591300 |
15T Sinking of Submarsel Pump at Jamra Shyampur near Himangshu Jana res JL 218 Plot 321 |
225000 |
15T Sinking of Submarsel Pump at Jamra Shyampur near Himangshu Jana res JL 218 Plot 3211 |
Completion of work |
-
latitude : 21.640060000000002
Longitude : 87.58525333333334
file name : Image_19092022135428478.png
|
2022-09-19 13:54:28.60392 |
200 |
46566762 |
15U Concreet Rd at Lachhimpur from Laxman Jana res to Nirmal Das res GS No 11 JL NO 219 Plot 374 |
100000 |
15U Concreet Rd at Lachhimpur from Laxman Jana res to Nirmal Das res GS No 11 JL NO 219 Plot 3741 |
Completion of work |
-
latitude : 21.64191,21.641900000000003
Longitude : 87.583505,87.58349666666666
file name : Image_19092022141350059.png
|
2022-09-19 14:13:50.298895 |
201 |
46566762 |
15U Concreet Rd at Lachhimpur from Laxman Jana res to Nirmal Das res GS No 11 JL NO 219 Plot 374 |
100000 |
15U Concreet Rd at Lachhimpur from Laxman Jana res to Nirmal Das res GS No 11 JL NO 219 Plot 3741 |
Completion of work |
-
latitude : 21.64188,21.641858333333335
Longitude : 87.58350333333334,87.58355833333331
file name : Image_19092022141353741.png
|
2022-09-19 14:13:53.828742 |
202 |
46566762 |
15U Concreet Rd at Lachhimpur from Laxman Jana res to Nirmal Das res GS No 11 JL NO 219 Plot 374 |
100000 |
15U Concreet Rd at Lachhimpur from Laxman Jana res to Nirmal Das res GS No 11 JL NO 219 Plot 3741 |
Completion of work |
-
latitude : 21.641871666666663,21.641873333333333,21.641873333333333
Longitude : 87.583505,87.58350333333334,87.58350333333334
file name : Image_19092022141356752.png
|
2022-09-19 14:13:56.837197 |
203 |
46566762 |
15U Concreet Rd at Lachhimpur from Laxman Jana res to Nirmal Das res GS No 11 JL NO 219 Plot 374 |
100000 |
15U Concreet Rd at Lachhimpur from Laxman Jana res to Nirmal Das res GS No 11 JL NO 219 Plot 3741 |
Completion of work |
-
latitude : 21.641858333333335,21.641840000000002
Longitude : 87.58350666666665,87.58355666666667
file name : Image_19092022141434005.png
|
2022-09-19 14:14:34.087593 |
204 |
46566762 |
15U Concreet Rd at Lachhimpur from Laxman Jana res to Nirmal Das res GS No 11 JL NO 219 Plot 374 |
100000 |
15U Concreet Rd at Lachhimpur from Laxman Jana res to Nirmal Das res GS No 11 JL NO 219 Plot 3741 |
Completion of work |
-
latitude : 21.641846666666666,21.641844999999996
Longitude : 87.58351666666667,87.58351499999999
file name : Image_19092022141510783.png
|
2022-09-19 14:15:10.870747 |
205 |
46609925 |
15T Sinking of Submarsel Pump at Dublabari near Sripati Pradhan res JL 240 Plot |
200000 |
15T Sinking of Submarsel Pump at Dublabari near Sripati Pradhan res JL 240 Plot 1 |
Completion of work |
-
latitude : 21.669726666666666
Longitude : 87.60122000000001
file name : Image_28092022095230696.png
|
2022-09-28 09:52:30.783204 |
206 |
46609925 |
15T Sinking of Submarsel Pump at Dublabari near Sripati Pradhan res JL 240 Plot |
200000 |
15T Sinking of Submarsel Pump at Dublabari near Sripati Pradhan res JL 240 Plot 1 |
Completion of work |
-
latitude : 21.669716666666666
Longitude : 87.60123
file name : Image_28092022095241989.png
|
2022-09-28 09:52:42.069844 |
207 |
46609925 |
15T Sinking of Submarsel Pump at Dublabari near Sripati Pradhan res JL 240 Plot |
200000 |
15T Sinking of Submarsel Pump at Dublabari near Sripati Pradhan res JL 240 Plot 1 |
Completion of work |
-
latitude : 21.669666666666664
Longitude : 87.60128666666667
file name : Image_28092022095305747.png
|
2022-09-28 09:53:05.82762 |
208 |
46609925 |
15T Sinking of Submarsel Pump at Dublabari near Sripati Pradhan res JL 240 Plot |
200000 |
15T Sinking of Submarsel Pump at Dublabari near Sripati Pradhan res JL 240 Plot 1 |
Completion of work |
-
latitude : 21.669683333333335
Longitude : 87.60126833333334
file name : Image_28092022095332137.png
|
2022-09-28 09:53:32.216502 |
209 |
46609925 |
15T Sinking of Submarsel Pump at Dublabari near Sripati Pradhan res JL 240 Plot |
200000 |
15T Sinking of Submarsel Pump at Dublabari near Sripati Pradhan res JL 240 Plot 1 |
Completion of work |
-
latitude : 21.669688333333337
Longitude : 87.601285
file name : Image_28092022095252253.png
|
2022-09-28 09:52:52.338847 |
210 |
46609925 |
15T Sinking of Submarsel Pump at Dublabari near Sripati Pradhan res JL 240 Plot |
200000 |
15T Sinking of Submarsel Pump at Dublabari near Sripati Pradhan res JL 240 Plot 1 |
Completion of work |
-
latitude : 21.669699999999995
Longitude : 87.60127833333333
file name : Image_28092022095428990.png
|
2022-09-28 09:54:29.085039 |
211 |
46565493 |
15U Concreet Rd at Jaldha from Sripati Latua res to Paban Majhi res GS No 7 JL NO 242 Plot 274 |
100000 |
15U Concreet Rd at Jaldha from Sripati Latua res to Paban Majhi res GS No 7 JL NO 242 Plot 274 1 |
Completion of work |
-
latitude : 21.657445,21.657445
Longitude : 87.61264333333332,87.61264333333332
file name : Image_28092022085134765.png
|
2022-09-28 08:51:34.857221 |
212 |
46565493 |
15U Concreet Rd at Jaldha from Sripati Latua res to Paban Majhi res GS No 7 JL NO 242 Plot 274 |
100000 |
15U Concreet Rd at Jaldha from Sripati Latua res to Paban Majhi res GS No 7 JL NO 242 Plot 274 1 |
Completion of work |
-
latitude : 21.65744833333333,21.65744833333333
Longitude : 87.61268,87.61268
file name : Image_28092022085837547.png
|
2022-09-28 08:58:37.644638 |
213 |
46565493 |
15U Concreet Rd at Jaldha from Sripati Latua res to Paban Majhi res GS No 7 JL NO 242 Plot 274 |
100000 |
15U Concreet Rd at Jaldha from Sripati Latua res to Paban Majhi res GS No 7 JL NO 242 Plot 274 1 |
Completion of work |
-
latitude : 21.657468333333334,21.657463333333332,21.657463333333332
Longitude : 87.61266333333333,87.61266499999998,87.61266499999998
file name : Image_28092022085841887.png
|
2022-09-28 08:58:41.97803 |
214 |
46565493 |
15U Concreet Rd at Jaldha from Sripati Latua res to Paban Majhi res GS No 7 JL NO 242 Plot 274 |
100000 |
15U Concreet Rd at Jaldha from Sripati Latua res to Paban Majhi res GS No 7 JL NO 242 Plot 274 1 |
Completion of work |
-
latitude : 21.657458333333338,21.657458333333338
Longitude : 87.61266499999998,87.61266499999998
file name : Image_28092022085926499.png
|
2022-09-28 08:59:26.591626 |
215 |
46581496 |
15U Concreet Rd at Kshirpal from Dhananjay Shit res to Ananta Bera res GS No 8 JL NO 238 Plot 34 |
100000 |
15U Concreet Rd at Kshirpal from Dhananjay Shit res to Ananta Bera res GS No 8 JL NO 238 Plot 341 |
Completion of work |
-
latitude : 21.654915,21.654915
Longitude : 87.60493166666666,87.60493166666666
file name : Image_27092022125846969.png
|
2022-09-27 12:58:47.069663 |
216 |
46581496 |
15U Concreet Rd at Kshirpal from Dhananjay Shit res to Ananta Bera res GS No 8 JL NO 238 Plot 34 |
100000 |
15U Concreet Rd at Kshirpal from Dhananjay Shit res to Ananta Bera res GS No 8 JL NO 238 Plot 341 |
Completion of work |
-
latitude : 21.65491833333333,21.65491833333333
Longitude : 87.60489000000001,87.60489000000001
file name : Image_27092022125930732.png
|
2022-09-27 12:59:30.829192 |
217 |
46581496 |
15U Concreet Rd at Kshirpal from Dhananjay Shit res to Ananta Bera res GS No 8 JL NO 238 Plot 34 |
100000 |
15U Concreet Rd at Kshirpal from Dhananjay Shit res to Ananta Bera res GS No 8 JL NO 238 Plot 341 |
Completion of work |
-
latitude : 21.65492,21.65492,21.65492
Longitude : 87.6049,87.6049,87.6049
file name : Image_27092022130014846.png
|
2022-09-27 13:00:14.938013 |
218 |
49114748 |
15T Sinking of Sumbersel Pump at Chandpur near Tapati Das res JL 237 Plot 860 |
250000 |
15T Sinking of Sumbersel Pump at Chandpur near Tapati Das res JL 237 Plot 8601 |
Completion of work |
-
latitude : 21.64707
Longitude : 87.60075499999999
file name : Image_28092022102717024.png
|
2022-09-28 10:27:17.102447 |
219 |
49114748 |
15T Sinking of Sumbersel Pump at Chandpur near Tapati Das res JL 237 Plot 860 |
250000 |
15T Sinking of Sumbersel Pump at Chandpur near Tapati Das res JL 237 Plot 8601 |
Completion of work |
-
latitude : 21.647100000000002
Longitude : 87.60077500000001
file name : Image_28092022102755370.png
|
2022-09-28 10:27:55.44701 |
220 |
49114748 |
15T Sinking of Sumbersel Pump at Chandpur near Tapati Das res JL 237 Plot 860 |
250000 |
15T Sinking of Sumbersel Pump at Chandpur near Tapati Das res JL 237 Plot 8601 |
Completion of work |
-
latitude : 21.647105000000003
Longitude : 87.60078333333334
file name : Image_28092022102836318.png
|
2022-09-28 10:28:36.399906 |
221 |
46610582 |
15T Sinking of Submarsel Pump at Kshirpal near Siddheswar Pradhan res JL 238 Plot 110 |
200000 |
15T Sinking of Submarsel Pump at Kshirpal near Siddheswar Pradhan res JL 238 Plot 110 1 |
Completion of work |
-
latitude : 21.659761666666668
Longitude : 87.60493833333334
file name : Image_18122022084249646.png
|
2022-12-18 08:42:49.732452 |
222 |
46610582 |
15T Sinking of Submarsel Pump at Kshirpal near Siddheswar Pradhan res JL 238 Plot 110 |
200000 |
15T Sinking of Submarsel Pump at Kshirpal near Siddheswar Pradhan res JL 238 Plot 110 1 |
Completion of work |
-
latitude : 21.65981
Longitude : 87.60491833333332
file name : Image_18122022084320581.png
|
2022-12-18 08:43:20.666967 |
223 |
46610582 |
15T Sinking of Submarsel Pump at Kshirpal near Siddheswar Pradhan res JL 238 Plot 110 |
200000 |
15T Sinking of Submarsel Pump at Kshirpal near Siddheswar Pradhan res JL 238 Plot 110 1 |
Completion of work |
-
latitude : 21.659806666666668
Longitude : 87.60489333333335
file name : Image_18122022084352055.png
|
2022-12-18 08:43:52.138415 |
224 |
46589808 |
15T Sinking of Submarsel Pump at Jaldha near Rabindranath Giri res JL 242 Plot 773 |
200000 |
15T Sinking of Submarsel Pump at Jaldha near Rabindranath Giri res JL 242 Plot 7731 |
Completion of work |
-
latitude : 21.64502166666667
Longitude : 87.60783666666666
file name : Image_18122022074041978.png
|
2022-12-18 07:40:42.059019 |
225 |
46589808 |
15T Sinking of Submarsel Pump at Jaldha near Rabindranath Giri res JL 242 Plot 773 |
200000 |
15T Sinking of Submarsel Pump at Jaldha near Rabindranath Giri res JL 242 Plot 7731 |
Completion of work |
-
latitude : 21.64499
Longitude : 87.60787666666666
file name : Image_18122022074115354.png
|
2022-12-18 07:41:15.435144 |
226 |
46589808 |
15T Sinking of Submarsel Pump at Jaldha near Rabindranath Giri res JL 242 Plot 773 |
200000 |
15T Sinking of Submarsel Pump at Jaldha near Rabindranath Giri res JL 242 Plot 7731 |
Completion of work |
-
latitude : 21.645014999999997
Longitude : 87.60785166666668
file name : Image_18122022074152115.png
|
2022-12-18 07:41:52.190551 |
227 |
46557803 |
15U Concreet Rd at Tajpur from Tajeswari Resort to Barsa Resort GS No 10 JL NO 244 Plot 136 Go |
200000 |
15U Concreet Rd at Tajpur from Tajeswari Resort to Barsa Resort GS No 10 JL NO 244 Plot 136 Go1 |
Completion of work |
-
latitude : 21.654782,21.654782
Longitude : 87.6232181,87.6232181
file name : Image_18122022093901874.png
|
2022-12-18 09:39:01.969837 |
228 |
46557803 |
15U Concreet Rd at Tajpur from Tajeswari Resort to Barsa Resort GS No 10 JL NO 244 Plot 136 Go |
200000 |
15U Concreet Rd at Tajpur from Tajeswari Resort to Barsa Resort GS No 10 JL NO 244 Plot 136 Go1 |
Completion of work |
-
latitude : 21.654782,21.654782
Longitude : 87.6232181,87.6232181
file name : Image_18122022093932865.png
|
2022-12-18 09:39:32.953832 |
229 |
46557803 |
15U Concreet Rd at Tajpur from Tajeswari Resort to Barsa Resort GS No 10 JL NO 244 Plot 136 Go |
200000 |
15U Concreet Rd at Tajpur from Tajeswari Resort to Barsa Resort GS No 10 JL NO 244 Plot 136 Go1 |
Completion of work |
-
latitude : 21.654782,21.654782
Longitude : 87.6232181,87.6232181
file name : Image_18122022094004718.png
|
2022-12-18 09:40:04.793075 |
230 |
46588648 |
15T Pacca Drain at Jaldha from Sasanka Das shop to sudhir Pradhan res GS No 7 JL NO 242 Plot 8 |
100000 |
15T Pacca Drain at Jaldha from Sasanka Das shop to sudhir Pradhan res GS No 7 JL NO 242 Plot 81 |
Completion of work |
-
latitude : 21.64588666666667
Longitude : 87.60652833333333
file name : Image_18122022075226552.png
|
2022-12-18 07:52:26.635994 |
231 |
46588648 |
15T Pacca Drain at Jaldha from Sasanka Das shop to sudhir Pradhan res GS No 7 JL NO 242 Plot 8 |
100000 |
15T Pacca Drain at Jaldha from Sasanka Das shop to sudhir Pradhan res GS No 7 JL NO 242 Plot 81 |
Completion of work |
-
latitude : 21.645895000000003
Longitude : 87.60651333333333
file name : Image_18122022075300493.png
|
2022-12-18 07:53:00.569656 |
232 |
46588648 |
15T Pacca Drain at Jaldha from Sasanka Das shop to sudhir Pradhan res GS No 7 JL NO 242 Plot 8 |
100000 |
15T Pacca Drain at Jaldha from Sasanka Das shop to sudhir Pradhan res GS No 7 JL NO 242 Plot 81 |
Completion of work |
-
latitude : 21.645891666666664
Longitude : 87.60651000000001
file name : Image_18122022075330301.png
|
2022-12-18 07:53:30.407181 |
233 |
46610828 |
15T Sinking of Submarsel Pump at Kshirpal near Jamini Mal res JL 238 Plot 370 |
200000 |
15T Sinking of Submarsel Pump at Kshirpal near Jamini Mal res JL 238 Plot 370 1 |
Completion of work |
-
latitude : 21.654049999999998
Longitude : 87.60557333333333
file name : Image_18122022164739330.png
|
2022-12-18 16:47:39.414242 |
234 |
46610828 |
15T Sinking of Submarsel Pump at Kshirpal near Jamini Mal res JL 238 Plot 370 |
200000 |
15T Sinking of Submarsel Pump at Kshirpal near Jamini Mal res JL 238 Plot 370 1 |
Completion of work |
-
latitude : 21.654073333333333
Longitude : 87.60562333333334
file name : Image_18122022164821152.png
|
2022-12-18 16:48:21.250138 |
235 |
46610828 |
15T Sinking of Submarsel Pump at Kshirpal near Jamini Mal res JL 238 Plot 370 |
200000 |
15T Sinking of Submarsel Pump at Kshirpal near Jamini Mal res JL 238 Plot 370 1 |
Completion of work |
-
latitude : 21.654041666666664
Longitude : 87.60558666666665
file name : Image_18122022164649927.png
|
2022-12-18 16:46:50.035145 |
236 |
46565638 |
15U Concreet Rd at Jaldha from Ajit Maity res to Swapan Jana res GS No 7 JL NO 242 Plot 708 to |
100000 |
15U Concreet Rd at Jaldha from Ajit Maity res to Swapan Jana res GS No 7 JL NO 242 Plot 708 to 1 |
Completion of work |
-
latitude : 21.651355,21.65125833333333
Longitude : 87.60518666666667,87.60515
file name : Image_18122022090746828.png
|
2022-12-18 09:07:46.885118 |
237 |
46565638 |
15U Concreet Rd at Jaldha from Ajit Maity res to Swapan Jana res GS No 7 JL NO 242 Plot 708 to |
100000 |
15U Concreet Rd at Jaldha from Ajit Maity res to Swapan Jana res GS No 7 JL NO 242 Plot 708 to 1 |
Completion of work |
-
latitude : 21.651339999999998,21.651329999999998
Longitude : 87.60517166666665,87.605205
file name : Image_18122022090829730.png
|
2022-12-18 09:08:29.797175 |
238 |
46565638 |
15U Concreet Rd at Jaldha from Ajit Maity res to Swapan Jana res GS No 7 JL NO 242 Plot 708 to |
100000 |
15U Concreet Rd at Jaldha from Ajit Maity res to Swapan Jana res GS No 7 JL NO 242 Plot 708 to 1 |
Completion of work |
-
latitude : 21.651611666666668,21.65153
Longitude : 87.60504666666665,87.60508166666665
file name : Image_18122022090905220.png
|
2022-12-18 09:09:05.276378 |
239 |
46566510 |
15U Concreet Rd at Shankarpur from Parimal Sen to Village rd Via Tapas Jana res GS No 12 JL NO 224 |
200000 |
15U Concreet Rd at Shankarpur from Parimal Sen to Village rd Via Tapas Jana res GS No 12 JL NO 2241 |
Completion of work |
-
latitude : 21.649466666666665,21.64947833333333
Longitude : 87.57306666666666,87.57304500000001
file name : Image_18122022111017209.png
|
2022-12-18 11:10:17.296598 |
240 |
46566510 |
15U Concreet Rd at Shankarpur from Parimal Sen to Village rd Via Tapas Jana res GS No 12 JL NO 224 |
200000 |
15U Concreet Rd at Shankarpur from Parimal Sen to Village rd Via Tapas Jana res GS No 12 JL NO 2241 |
Completion of work |
-
latitude : 21.64949166666667,21.649486666666668
Longitude : 87.573,87.57300500000001
file name : Image_18122022111138838.png
|
2022-12-18 11:11:38.918973 |
241 |
46566510 |
15U Concreet Rd at Shankarpur from Parimal Sen to Village rd Via Tapas Jana res GS No 12 JL NO 224 |
200000 |
15U Concreet Rd at Shankarpur from Parimal Sen to Village rd Via Tapas Jana res GS No 12 JL NO 2241 |
Completion of work |
-
latitude : 21.649471666666667,21.649483333333333
Longitude : 87.57299166666665,87.573
file name : Image_18122022111211868.png
|
2022-12-18 11:12:11.949401 |
242 |
46582815 |
15U Upgradetion of Passenger Shed at Tengramari near Kshirpal Stand GS No 5 JL NO 235 Plot 263 Go |
100000 |
15U Upgradetion of Passenger Shed at Tengramari near Kshirpal Stand GS No 5 JL NO 235 Plot 263 Go1 |
Completion of work |
-
latitude : 21.656850000000002
Longitude : 87.59746500000001
file name : Image_17122022172529457.png
|
2022-12-17 17:25:29.544766 |
243 |
46582815 |
15U Upgradetion of Passenger Shed at Tengramari near Kshirpal Stand GS No 5 JL NO 235 Plot 263 Go |
100000 |
15U Upgradetion of Passenger Shed at Tengramari near Kshirpal Stand GS No 5 JL NO 235 Plot 263 Go1 |
Completion of work |
-
latitude : 21.656810000000004
Longitude : 87.597475
file name : Image_17122022172619215.png
|
2022-12-17 17:26:19.309868 |
244 |
46582815 |
15U Upgradetion of Passenger Shed at Tengramari near Kshirpal Stand GS No 5 JL NO 235 Plot 263 Go |
100000 |
15U Upgradetion of Passenger Shed at Tengramari near Kshirpal Stand GS No 5 JL NO 235 Plot 263 Go1 |
Completion of work |
-
latitude : 21.656825000000005
Longitude : 87.597455
file name : Image_17122022172705444.png
|
2022-12-17 17:27:05.530299 |
245 |
46564898 |
15U Concreet Rd at Jaldha from Narayan Das res to Subal Dalai res GS No 7 JL NO 242 Plot 882 to |
100000 |
15U Concreet Rd at Jaldha from Narayan Das res to Subal Dalai res GS No 7 JL NO 242 Plot 882 to1 |
Completion of work |
-
latitude : 21.645316666666666,21.64528833333333
Longitude : 87.60691999999999,87.60705166666666
file name : Image_18122022074851559.png
|
2022-12-18 07:48:51.653511 |
246 |
46564898 |
15U Concreet Rd at Jaldha from Narayan Das res to Subal Dalai res GS No 7 JL NO 242 Plot 882 to |
100000 |
15U Concreet Rd at Jaldha from Narayan Das res to Subal Dalai res GS No 7 JL NO 242 Plot 882 to1 |
Completion of work |
-
latitude : 21.645323333333334,21.64532166666667
Longitude : 87.60692333333333,87.60692166666668
file name : Image_18122022074922688.png
|
2022-12-18 07:49:22.794811 |
247 |
46564898 |
15U Concreet Rd at Jaldha from Narayan Das res to Subal Dalai res GS No 7 JL NO 242 Plot 882 to |
100000 |
15U Concreet Rd at Jaldha from Narayan Das res to Subal Dalai res GS No 7 JL NO 242 Plot 882 to1 |
Completion of work |
-
latitude : 21.64535,21.645371666666666
Longitude : 87.606915,87.606965
file name : Image_18122022074957581.png
|
2022-12-18 07:49:57.672353 |
248 |
46609643 |
15T Sinking of Submarsel Pump at Lachhimpur near Nirmal Das res JL 219 Plot 429 |
225000 |
15T Sinking of Submarsel Pump at Lachhimpur near Nirmal Das res JL 219 Plot 4291 |
Completion of work |
-
latitude : 21.641916666666663
Longitude : 87.58379166666667
file name : Image_18122022105548942.png
|
2022-12-18 10:55:49.067058 |
249 |
46609643 |
15T Sinking of Submarsel Pump at Lachhimpur near Nirmal Das res JL 219 Plot 429 |
225000 |
15T Sinking of Submarsel Pump at Lachhimpur near Nirmal Das res JL 219 Plot 4291 |
Completion of work |
-
latitude : 21.64189666666667
Longitude : 87.58379333333332
file name : Image_18122022105618625.png
|
2022-12-18 10:56:18.739998 |
250 |
46609643 |
15T Sinking of Submarsel Pump at Lachhimpur near Nirmal Das res JL 219 Plot 429 |
225000 |
15T Sinking of Submarsel Pump at Lachhimpur near Nirmal Das res JL 219 Plot 4291 |
Completion of work |
-
latitude : 21.641925
Longitude : 87.58378499999999
file name : Image_18122022105648878.png
|
2022-12-18 10:56:48.980607 |
251 |
38962703 |
CFC Extention of Pipe line Water for Supply at Dublabari from Jhareswar Manna res to Srikanta Das |
100000 |
CFC Extention of Pipe line Water for Supply at Dublabari from Jhareswar Manna res to Srikanta Das1 |
Completion of work |
-
latitude : 21.670756666666662,21.670733333333335
Longitude : 87.60540833333334,87.60538166666666
file name : Image_19122022114756661.png
|
2022-12-19 11:47:56.760043 |
252 |
38962703 |
CFC Extention of Pipe line Water for Supply at Dublabari from Jhareswar Manna res to Srikanta Das |
100000 |
CFC Extention of Pipe line Water for Supply at Dublabari from Jhareswar Manna res to Srikanta Das1 |
Completion of work |
-
latitude : 21.670779999999997,21.670734999999997
Longitude : 87.60541666666668,87.60539166666668
file name : Image_19122022114826531.png
|
2022-12-19 11:48:26.629585 |
253 |
38962703 |
CFC Extention of Pipe line Water for Supply at Dublabari from Jhareswar Manna res to Srikanta Das |
100000 |
CFC Extention of Pipe line Water for Supply at Dublabari from Jhareswar Manna res to Srikanta Das1 |
Completion of work |
-
latitude : 21.670758333333332,21.670761666666667
Longitude : 87.60537833333335,87.60538666666667
file name : Image_19122022114903734.png
|
2022-12-19 11:49:03.836787 |
254 |
46611254 |
15T Pacca Drain at Gopalpur from BBD Club to Arun Jana res GS No 1 JL NO 210 Plot 18 Goal 9 |
200000 |
15T Pacca Drain at Gopalpur from BBD Club to Arun Jana res GS No 1 JL NO 210 Plot 18 Goal 91 |
Completion of work |
-
latitude : 21.651069999999997
Longitude : 87.61422666666667
file name : Image_17122022162651432.png
|
2022-12-17 16:26:51.578213 |
255 |
46611254 |
15T Pacca Drain at Gopalpur from BBD Club to Arun Jana res GS No 1 JL NO 210 Plot 18 Goal 9 |
200000 |
15T Pacca Drain at Gopalpur from BBD Club to Arun Jana res GS No 1 JL NO 210 Plot 18 Goal 91 |
Completion of work |
-
latitude : 21.664778333333334
Longitude : 87.54911833333333
file name : Image_17122022162733677.png
|
2022-12-17 16:27:33.768341 |
256 |
46611254 |
15T Pacca Drain at Gopalpur from BBD Club to Arun Jana res GS No 1 JL NO 210 Plot 18 Goal 9 |
200000 |
15T Pacca Drain at Gopalpur from BBD Club to Arun Jana res GS No 1 JL NO 210 Plot 18 Goal 91 |
Completion of work |
-
latitude : 21.664785
Longitude : 87.549125
file name : Image_17122022162809224.png
|
2022-12-17 16:28:09.312345 |
257 |
46587107 |
15U Concreet Rd at Bodhra from CC Rd to Satyaranjan Patra res GS No 3 JL NO 234 Plot Goal 9 |
100000 |
15U Concreet Rd at Bodhra from CC Rd to Satyaranjan Patra res GS No 3 JL NO 234 Plot Goal 91 |
Completion of work |
-
latitude : 21.653611666666666,21.653591666666664
Longitude : 87.58892499999999,87.58887833333334
file name : Image_18122022104258850.png
|
2022-12-18 10:42:58.936017 |
258 |
46587107 |
15U Concreet Rd at Bodhra from CC Rd to Satyaranjan Patra res GS No 3 JL NO 234 Plot Goal 9 |
100000 |
15U Concreet Rd at Bodhra from CC Rd to Satyaranjan Patra res GS No 3 JL NO 234 Plot Goal 91 |
Completion of work |
-
latitude : 21.653608333333334,21.653598333333335
Longitude : 87.58892166666668,87.58892833333333
file name : Image_18122022104331269.png
|
2022-12-18 10:43:31.357354 |
259 |
46587107 |
15U Concreet Rd at Bodhra from CC Rd to Satyaranjan Patra res GS No 3 JL NO 234 Plot Goal 9 |
100000 |
15U Concreet Rd at Bodhra from CC Rd to Satyaranjan Patra res GS No 3 JL NO 234 Plot Goal 91 |
Completion of work |
-
latitude : 21.65363333333333,21.653636666666664
Longitude : 87.58889833333333,87.58889166666668
file name : Image_18122022104403652.png
|
2022-12-18 10:44:03.737669 |
260 |
46590390 |
15T Sinking of Submarsel Pump at Chandpur near Amal Barik res JL 237 Plot 315 |
250000 |
15T Sinking of Submarsel Pump at Chandpur near Amal Barik res JL 237 Plot 3151 |
Completion of work |
-
latitude : 21.647693333333336
Longitude : 87.59737500000001
file name : Image_18122022080200862.png
|
2022-12-18 08:02:00.932783 |
261 |
46590390 |
15T Sinking of Submarsel Pump at Chandpur near Amal Barik res JL 237 Plot 315 |
250000 |
15T Sinking of Submarsel Pump at Chandpur near Amal Barik res JL 237 Plot 3151 |
Completion of work |
-
latitude : 21.647673333333334
Longitude : 87.59745
file name : Image_18122022080250564.png
|
2022-12-18 08:02:50.628334 |
262 |
46590390 |
15T Sinking of Submarsel Pump at Chandpur near Amal Barik res JL 237 Plot 315 |
250000 |
15T Sinking of Submarsel Pump at Chandpur near Amal Barik res JL 237 Plot 3151 |
Completion of work |
-
latitude : 21.647663333333337
Longitude : 87.59737666666666
file name : Image_18122022080336151.png
|
2022-12-18 08:03:36.21276 |
263 |
46566388 |
15U Concreet Rd at Chandpur from Mantu Rauth res to Pacca rd GS No 9 JL NO 237 Plot 352 to 355 |
100000 |
15U Concreet Rd at Chandpur from Mantu Rauth res to Pacca rd GS No 9 JL NO 237 Plot 352 to 355 1 |
Plinth level |
-
latitude : 21.643465,21.643503333333335
Longitude : 87.59594666666665,87.59589833333332
file name : Image_18122022081110243.png
|
2022-12-18 08:11:10.320326 |
264 |
46566388 |
15U Concreet Rd at Chandpur from Mantu Rauth res to Pacca rd GS No 9 JL NO 237 Plot 352 to 355 |
100000 |
15U Concreet Rd at Chandpur from Mantu Rauth res to Pacca rd GS No 9 JL NO 237 Plot 352 to 355 1 |
Plinth level |
-
latitude : 21.643465,21.643463333333337
Longitude : 87.59589499999998,87.59588666666666
file name : Image_18122022081143972.png
|
2022-12-18 08:11:44.04829 |
265 |
46566388 |
15U Concreet Rd at Chandpur from Mantu Rauth res to Pacca rd GS No 9 JL NO 237 Plot 352 to 355 |
100000 |
15U Concreet Rd at Chandpur from Mantu Rauth res to Pacca rd GS No 9 JL NO 237 Plot 352 to 355 1 |
Plinth level |
-
latitude : 21.643478333333338,21.643478333333338
Longitude : 87.59587666666667,87.59587666666667
file name : Image_18122022081217429.png
|
2022-12-18 08:12:17.504912 |
266 |
46582608 |
15U Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap GS No 5 JL NO 235 Plot 12 |
100000 |
15U Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap GS No 5 JL NO 235 Plot 121 |
Completion of work |
-
latitude : 21.661271666666668
Longitude : 87.595725
file name : Image_20122022092810313.png
|
2022-12-20 09:28:10.398803 |
267 |
46582608 |
15U Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap GS No 5 JL NO 235 Plot 12 |
100000 |
15U Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap GS No 5 JL NO 235 Plot 121 |
Completion of work |
-
latitude : 21.66131833333333
Longitude : 87.595705
file name : Image_20122022092842810.png
|
2022-12-20 09:28:42.890097 |
268 |
46582608 |
15U Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap GS No 5 JL NO 235 Plot 12 |
100000 |
15U Upgradetion of Multipurpose Building at Tengramari Durgapuja Mandap GS No 5 JL NO 235 Plot 121 |
Completion of work |
-
latitude : 21.661328333333337
Longitude : 87.595705
file name : Image_20122022092916933.png
|
2022-12-20 09:29:17.013584 |
269 |
46586853 |
15U Concreet Rd at Bodhra from CC Rd to Ranjit Chanda res GS No 3 JL NO 234 Plot 550 Goal 9 |
100000 |
15U Concreet Rd at Bodhra from CC Rd to Ranjit Chanda res GS No 3 JL NO 234 Plot 550 Goal 91 |
Completion of work |
-
latitude : 21.65786666666667,21.657859999999996
Longitude : 87.58738666666667,87.58739333333332
file name : Image_29122022161451987.png
|
2022-12-29 16:14:52.070174 |
270 |
46586853 |
15U Concreet Rd at Bodhra from CC Rd to Ranjit Chanda res GS No 3 JL NO 234 Plot 550 Goal 9 |
100000 |
15U Concreet Rd at Bodhra from CC Rd to Ranjit Chanda res GS No 3 JL NO 234 Plot 550 Goal 91 |
Completion of work |
-
latitude : 21.657885000000004,21.657870000000003
Longitude : 87.58740833333334,87.58739833333333
file name : Image_29122022161524554.png
|
2022-12-29 16:15:24.636754 |
271 |
46586853 |
15U Concreet Rd at Bodhra from CC Rd to Ranjit Chanda res GS No 3 JL NO 234 Plot 550 Goal 9 |
100000 |
15U Concreet Rd at Bodhra from CC Rd to Ranjit Chanda res GS No 3 JL NO 234 Plot 550 Goal 91 |
Completion of work |
-
latitude : 21.657876666666667,21.657876666666667
Longitude : 87.58741333333334,87.58741333333334
file name : Image_29122022161555518.png
|
2022-12-29 16:15:55.603245 |
272 |
38963036 |
CFC Construction of Community tiolet at Tengramari Durgapuja Mandap |
100000 |
CFC Construction of Community tiolet at Tengramari Durgapuja Mandap1 |
Completion of work |
-
latitude : 21.66146
Longitude : 87.595765
file name : Image_29122022164655493.png
|
2022-12-29 16:46:55.571462 |
273 |
38963036 |
CFC Construction of Community tiolet at Tengramari Durgapuja Mandap |
100000 |
CFC Construction of Community tiolet at Tengramari Durgapuja Mandap1 |
Completion of work |
-
latitude : 21.66130333333333
Longitude : 87.59584500000001
file name : Image_29122022164732965.png
|
2022-12-29 16:47:33.041154 |
274 |
38963036 |
CFC Construction of Community tiolet at Tengramari Durgapuja Mandap |
100000 |
CFC Construction of Community tiolet at Tengramari Durgapuja Mandap1 |
Completion of work |
-
latitude : 21.661340000000003
Longitude : 87.59573166666665
file name : Image_29122022164816852.png
|
2022-12-29 16:48:16.928435 |
275 |
49162715 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
150000 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Roof laid |
-
latitude : 21.668740000000003,21.668765
Longitude : 87.59670166666668,87.59676666666668
file name : Image_05012023153041731.png
|
2023-01-05 15:30:41.815533 |
276 |
49162715 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
150000 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Roof laid |
-
latitude : 21.668773333333334,21.668773333333334
Longitude : 87.59677666666667,87.59677666666667
file name : Image_05012023153111965.png
|
2023-01-05 15:31:12.054434 |
277 |
49162715 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
150000 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Roof laid |
-
latitude : 21.668731666666666,21.668731666666666
Longitude : 87.59675166666666,87.59675166666666
file name : Image_05012023153142365.png
|
2023-01-05 15:31:42.462381 |
278 |
49162715 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
150000 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Completion of work |
-
latitude : 21.66871,21.66871
Longitude : 87.59677500000001,87.59677500000001
file name : Image_29122022163927630.png
|
2022-12-29 16:39:27.702223 |
279 |
49162715 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
150000 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Completion of work |
-
latitude : 21.66877833333333,21.66877833333333
Longitude : 87.59682,87.59682
file name : Image_31122022141138827.png
|
2022-12-31 14:11:38.898774 |
280 |
49162715 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
150000 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Completion of work |
-
latitude : 21.668815000000002,21.668831666666666
Longitude : 87.59683000000001,87.59682833333333
file name : Image_31122022141213196.png
|
2022-12-31 14:12:13.26841 |
281 |
49162715 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
150000 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Plinth level |
-
latitude : 21.668845,21.668848333333337
Longitude : 87.59679,87.59678833333334
file name : Image_31122022142017588.png
|
2022-12-31 14:20:17.665268 |
282 |
49162715 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
150000 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Plinth level |
-
latitude : 21.66882333333333,21.66882666666667
Longitude : 87.59675666666665,87.59675666666665
file name : Image_31122022142049849.png
|
2022-12-31 14:20:49.938954 |
283 |
49162715 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
150000 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Roof laid |
-
latitude : 21.66878,21.668803333333337,21.668813333333333
Longitude : 87.59682666666667,87.596825,87.59683000000001
file name : Image_31122022142827266.png
|
2022-12-31 14:28:27.339592 |
284 |
49162715 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
150000 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Completion of work |
-
latitude : 21.66875166666667,21.66875166666667
Longitude : 87.596805,87.596805
file name : Image_31122022141104466.png
|
2022-12-31 14:11:04.542606 |
285 |
49162715 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
150000 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Completion of work |
-
latitude : 21.668738333333334,21.668738333333334
Longitude : 87.59685833333333,87.59685833333333
file name : Image_29122022164003310.png
|
2022-12-29 16:40:03.383108 |
286 |
49162715 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
150000 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Completion of work |
-
latitude : 21.668729999999996,21.668723333333332,21.66871833333333
Longitude : 87.59689333333333,87.59689666666667,87.59689666666667
file name : Image_29122022164040418.png
|
2022-12-29 16:40:40.494695 |
287 |
49162715 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
150000 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Roof laid |
-
latitude : 21.668818333333334,21.668815000000002
Longitude : 87.59674333333332,87.59674000000001
file name : Image_31122022142932207.png
|
2022-12-31 14:29:32.285629 |
288 |
49162715 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
150000 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Roof laid |
-
latitude : 21.668819999999997,21.668819999999997
Longitude : 87.59682666666667,87.59682666666667
file name : Image_31122022142856049.png
|
2022-12-31 14:28:56.126548 |
289 |
49162715 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
150000 |
OF Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Plinth level |
-
latitude : 21.66886833333333,21.668870000000002
Longitude : 87.59677833333332,87.59677833333332
file name : Image_31122022142122023.png
|
2022-12-31 14:21:22.105604 |
290 |
46581107 |
15U Concreet Rd at Dublabari from Bikash Maity res to Abanti Maity res GS No 6 JL NO 240 Plot 18 |
100000 |
15U Concreet Rd at Dublabari from Bikash Maity res to Abanti Maity res GS No 6 JL NO 240 Plot 181 |
Completion of work |
-
latitude : 21.6679907,21.6679907
Longitude : 87.5990419,87.5990419
file name : Image_11012023161142250.png
|
2023-01-11 16:11:42.331981 |
291 |
46581107 |
15U Concreet Rd at Dublabari from Bikash Maity res to Abanti Maity res GS No 6 JL NO 240 Plot 18 |
100000 |
15U Concreet Rd at Dublabari from Bikash Maity res to Abanti Maity res GS No 6 JL NO 240 Plot 181 |
Completion of work |
-
latitude : 21.669711666666664,21.669713333333334
Longitude : 87.60086000000001,87.60087166666666
file name : Image_11012023161250075.png
|
2023-01-11 16:12:50.156698 |
292 |
46581107 |
15U Concreet Rd at Dublabari from Bikash Maity res to Abanti Maity res GS No 6 JL NO 240 Plot 18 |
100000 |
15U Concreet Rd at Dublabari from Bikash Maity res to Abanti Maity res GS No 6 JL NO 240 Plot 181 |
Completion of work |
-
latitude : 21.669755000000002,21.669755000000002
Longitude : 87.60087999999999,87.60087999999999
file name : Image_11012023161334622.png
|
2023-01-11 16:13:34.710544 |
293 |
46583076 |
15U Concreet Rd at Tengramari from Sumita Payra res to Panchanan Dey res GS No 5 JL NO 235 Plot |
100000 |
15U Concreet Rd at Tengramari from Sumita Payra res to Panchanan Dey res GS No 5 JL NO 235 Plot 1 |
Completion of work |
-
latitude : 21.6586231,21.6586231,21.6586231
Longitude : 87.595029,87.595029,87.595029
file name : Image_24012023162108345.png
|
2023-01-24 16:21:08.421963 |
294 |
46583076 |
15U Concreet Rd at Tengramari from Sumita Payra res to Panchanan Dey res GS No 5 JL NO 235 Plot |
100000 |
15U Concreet Rd at Tengramari from Sumita Payra res to Panchanan Dey res GS No 5 JL NO 235 Plot 1 |
Completion of work |
-
latitude : 21.658096666666665,21.658099999999997
Longitude : 87.59432333333334,87.59432
file name : Image_24012023162140691.png
|
2023-01-24 16:21:40.764324 |
295 |
46583076 |
15U Concreet Rd at Tengramari from Sumita Payra res to Panchanan Dey res GS No 5 JL NO 235 Plot |
100000 |
15U Concreet Rd at Tengramari from Sumita Payra res to Panchanan Dey res GS No 5 JL NO 235 Plot 1 |
Completion of work |
-
latitude : 21.658066666666667,21.658066666666667,21.658066666666667
Longitude : 87.59433666666668,87.59433666666668,87.59433666666668
file name : Image_24012023162212860.png
|
2023-01-24 16:22:12.932599 |
296 |
46588167 |
15U Repiaring of Tube well and Platform at GP area GS No All JL NO Plot Goal 6 |
175894 |
15U Repiaring of Tube well and Platform at GP area GS No All JL NO Plot Goal 61 |
Completion of work |
-
latitude : 21.656841666666665
Longitude : 87.59728666666666
file name : Image_24012023163245238.png
|
2023-01-24 16:32:45.315482 |
297 |
46588167 |
15U Repiaring of Tube well and Platform at GP area GS No All JL NO Plot Goal 6 |
175894 |
15U Repiaring of Tube well and Platform at GP area GS No All JL NO Plot Goal 61 |
Completion of work |
-
latitude : 21.656858333333336
Longitude : 87.59728666666666
file name : Image_24012023163332539.png
|
2023-01-24 16:33:32.617356 |
298 |
46588167 |
15U Repiaring of Tube well and Platform at GP area GS No All JL NO Plot Goal 6 |
175894 |
15U Repiaring of Tube well and Platform at GP area GS No All JL NO Plot Goal 61 |
Completion of work |
-
latitude : 21.656850000000002
Longitude : 87.59728833333332
file name : Image_24012023163414191.png
|
2023-01-24 16:34:14.286199 |
299 |
46586186 |
15U Concreet Rd at Tengramari from Bimal Para res to Dayal Chanda res via Chaitanya Brahma GS No 5 |
150000 |
15U Concreet Rd at Tengramari from Bimal Para res to Dayal Chanda res via Chaitanya Brahma GS No 5 1 |
Completion of work |
-
latitude : 21.657091666666663,21.657091666666663,21.657118333333333
Longitude : 87.59602500000001,87.59602500000001,87.59601666666667
file name : Image_24012023162651576.png
|
2023-01-24 16:26:51.656358 |
300 |
46586186 |
15U Concreet Rd at Tengramari from Bimal Para res to Dayal Chanda res via Chaitanya Brahma GS No 5 |
150000 |
15U Concreet Rd at Tengramari from Bimal Para res to Dayal Chanda res via Chaitanya Brahma GS No 5 1 |
Completion of work |
-
latitude : 21.657208333333333,21.65720666666667,21.65720666666667
Longitude : 87.59601833333333,87.59600999999999,87.59600999999999
file name : Image_24012023162804145.png
|
2023-01-24 16:28:04.21449 |
301 |
46586186 |
15U Concreet Rd at Tengramari from Bimal Para res to Dayal Chanda res via Chaitanya Brahma GS No 5 |
150000 |
15U Concreet Rd at Tengramari from Bimal Para res to Dayal Chanda res via Chaitanya Brahma GS No 5 1 |
Completion of work |
-
latitude : 21.657169999999997,21.657173333333336,21.65717833333333
Longitude : 87.59601666666667,87.59601666666667,87.59601833333333
file name : Image_24012023162906908.png
|
2023-01-24 16:29:06.999009 |
302 |
56741958 |
CFC Pucca Drain at Deulbutta Sansad from Bankim Senapati house to Culvert J.L. No.-105 Plot No.-168 |
133000 |
CFC Pucca Drain at Deulbutta Sansad from Bankim Senapati house to Culvert J.L. No.-105 Plot No.-1681 |
Completion of work |
-
latitude : 21.663884999999997,21.663886666666667,21.663891666666668
Longitude : 87.54629833333333,87.54629833333333,87.54631166666668
file name : Image_30032023132922631.png
|
2023-03-30 13:29:22.706782 |
303 |
56741958 |
CFC Pucca Drain at Deulbutta Sansad from Bankim Senapati house to Culvert J.L. No.-105 Plot No.-168 |
133000 |
CFC Pucca Drain at Deulbutta Sansad from Bankim Senapati house to Culvert J.L. No.-105 Plot No.-1681 |
Completion of work |
-
latitude : 21.663891666666668,21.663883333333334,21.663878333333333
Longitude : 87.5463,87.54630333333334,87.54630166666666
file name : Image_30032023133048571.png
|
2023-03-30 13:30:48.65759 |
304 |
56741958 |
CFC Pucca Drain at Deulbutta Sansad from Bankim Senapati house to Culvert J.L. No.-105 Plot No.-168 |
133000 |
CFC Pucca Drain at Deulbutta Sansad from Bankim Senapati house to Culvert J.L. No.-105 Plot No.-1681 |
Completion of work |
-
latitude : 21.663923333333333,21.663926666666665,21.663926666666665
Longitude : 87.54628499999998,87.54628333333334,87.54628333333334
file name : Image_30032023133121015.png
|
2023-03-30 13:31:21.08983 |
305 |
56753739 |
CFC Concrete road at Jashipur from Uttam Patra house to Shrikanta house jl no.224 plot no |
150000 |
CFC Concrete road at Jashipur from Uttam Patra house to Shrikanta house jl no.224 plot no1 |
Completion of work |
-
latitude : 21.66021333333333,21.66021333333333
Longitude : 87.575535,87.575535
file name : Image_10032023133504845.png
|
2023-03-10 13:35:04.945695 |
306 |
56753739 |
CFC Concrete road at Jashipur from Uttam Patra house to Shrikanta house jl no.224 plot no |
150000 |
CFC Concrete road at Jashipur from Uttam Patra house to Shrikanta house jl no.224 plot no1 |
Completion of work |
-
latitude : 21.660230000000002,21.660230000000002
Longitude : 87.57555499999998,87.57555499999998
file name : Image_10032023133430485.png
|
2023-03-10 13:34:30.571952 |
307 |
56753739 |
CFC Concrete road at Jashipur from Uttam Patra house to Shrikanta house jl no.224 plot no |
150000 |
CFC Concrete road at Jashipur from Uttam Patra house to Shrikanta house jl no.224 plot no1 |
Completion of work |
-
latitude : 21.6602,21.66019833333333
Longitude : 87.57558833333333,87.57558499999999
file name : Image_10032023133351794.png
|
2023-03-10 13:33:51.885673 |
308 |
56753427 |
CFC Concrete road at Bodhra Sansad from Concrete road to Dulal Chandra house via Subal jana jl no 23 |
100000 |
CFC Concrete road at Bodhra Sansad from Concrete road to Dulal Chandra house via Subal jana jl no 231 |
Completion of work |
-
latitude : 21.658871666666663,21.658875
Longitude : 87.58619666666667,87.58620333333334
file name : Image_10032023132238388.png
|
2023-03-10 13:22:38.463397 |
309 |
56753427 |
CFC Concrete road at Bodhra Sansad from Concrete road to Dulal Chandra house via Subal jana jl no 23 |
100000 |
CFC Concrete road at Bodhra Sansad from Concrete road to Dulal Chandra house via Subal jana jl no 231 |
Completion of work |
-
latitude : 21.658888333333334,21.658893333333335
Longitude : 87.58625500000001,87.58625833333332
file name : Image_10032023132313944.png
|
2023-03-10 13:23:14.019318 |
310 |
56753427 |
CFC Concrete road at Bodhra Sansad from Concrete road to Dulal Chandra house via Subal jana jl no 23 |
100000 |
CFC Concrete road at Bodhra Sansad from Concrete road to Dulal Chandra house via Subal jana jl no 231 |
Completion of work |
-
latitude : 21.658883333333332,21.658885
Longitude : 87.58622166666667,87.58621166666666
file name : Image_10032023132353857.png
|
2023-03-10 13:23:53.940074 |
311 |
56754130 |
CFC Concrete road at Jashipur sansad from Nityananda Kamila house to Manas Pariari house jl no 234 p |
100000 |
CFC Concrete road at Jashipur sansad from Nityananda Kamila house to Manas Pariari house jl no 234 p1 |
Completion of work |
-
latitude : 21.66090166666667,21.66089833333333
Longitude : 87.58155166666666,87.58154833333334
file name : Image_10032023132821794.png
|
2023-03-10 13:28:21.924839 |
312 |
56754130 |
CFC Concrete road at Jashipur sansad from Nityananda Kamila house to Manas Pariari house jl no 234 p |
100000 |
CFC Concrete road at Jashipur sansad from Nityananda Kamila house to Manas Pariari house jl no 234 p1 |
Completion of work |
-
latitude : 21.66087333333333,21.66087333333333
Longitude : 87.58155666666669,87.58155666666669
file name : Image_10032023132858964.png
|
2023-03-10 13:28:59.044475 |
313 |
56754130 |
CFC Concrete road at Jashipur sansad from Nityananda Kamila house to Manas Pariari house jl no 234 p |
100000 |
CFC Concrete road at Jashipur sansad from Nityananda Kamila house to Manas Pariari house jl no 234 p1 |
Completion of work |
-
latitude : 21.660846666666664,21.660845000000002
Longitude : 87.58158999999999,87.58158499999999
file name : Image_10032023132933869.png
|
2023-03-10 13:29:33.944516 |
314 |
56752837 |
CFC Concrete road at Bodhra Sansad from Concrete road Dey pukur parh jl no 2314 plot 457-457 |
100000 |
CFC Concrete road at Bodhra Sansad from Concrete road Dey pukur parh jl no 2314 plot 457-4571 |
Completion of work |
-
latitude : 21.660026666666667,21.659985
Longitude : 87.58906666666665,87.58908833333335
file name : Image_10032023131754562.png
|
2023-03-10 13:17:54.735027 |
315 |
56752837 |
CFC Concrete road at Bodhra Sansad from Concrete road Dey pukur parh jl no 2314 plot 457-457 |
100000 |
CFC Concrete road at Bodhra Sansad from Concrete road Dey pukur parh jl no 2314 plot 457-4571 |
Completion of work |
-
latitude : 21.660011666666666,21.660014999999998
Longitude : 87.58909333333334,87.58909333333334
file name : Image_10032023131829575.png
|
2023-03-10 13:18:29.656755 |
316 |
56752837 |
CFC Concrete road at Bodhra Sansad from Concrete road Dey pukur parh jl no 2314 plot 457-457 |
100000 |
CFC Concrete road at Bodhra Sansad from Concrete road Dey pukur parh jl no 2314 plot 457-4571 |
Completion of work |
-
latitude : 21.660008333333334,21.660010000000003
Longitude : 87.58906666666665,87.58907333333333
file name : Image_10032023131902050.png
|
2023-03-10 13:19:02.134195 |
317 |
59466323 |
CFC of Pucca drain at Jashipur Sansad from Gopal Das house to Kalipada Das Jl. No. 234 Plot No.675 |
165535 |
CFC of Pucca drain at Jashipur Sansad from Gopal Das house to Kalipada Das Jl. No. 234 Plot No.6751 |
Completion of work |
-
latitude : 21.650605000000002,21.650605000000002
Longitude : 87.58452833333334,87.58452666666666
file name : Image_10032023134733050.png
|
2023-03-10 13:47:33.130832 |
318 |
59466323 |
CFC of Pucca drain at Jashipur Sansad from Gopal Das house to Kalipada Das Jl. No. 234 Plot No.675 |
165535 |
CFC of Pucca drain at Jashipur Sansad from Gopal Das house to Kalipada Das Jl. No. 234 Plot No.6751 |
Completion of work |
-
latitude : 21.650615000000002,21.650615000000002
Longitude : 87.58449333333334,87.58449333333334
file name : Image_10032023134821430.png
|
2023-03-10 13:48:21.51802 |
319 |
59466323 |
CFC of Pucca drain at Jashipur Sansad from Gopal Das house to Kalipada Das Jl. No. 234 Plot No.675 |
165535 |
CFC of Pucca drain at Jashipur Sansad from Gopal Das house to Kalipada Das Jl. No. 234 Plot No.6751 |
Completion of work |
-
latitude : 21.650615000000002,21.650615000000002
Longitude : 87.58449,87.58449
file name : Image_10032023134903937.png
|
2023-03-10 13:49:04.010667 |
320 |
46588422 |
15T Sinking of Submarsel Pump at Bahadurpur near Rampada Mandal Plot 334 JL 209 |
300000 |
15T Sinking of Submarsel Pump at Bahadurpur near Rampada Mandal Plot 334 JL 2091 |
Completion of work |
-
latitude : 21.652293333333333
Longitude : 87.55351166666667
file name : Image_14032023092202219.png
|
2023-03-14 09:22:02.294939 |
321 |
46588422 |
15T Sinking of Submarsel Pump at Bahadurpur near Rampada Mandal Plot 334 JL 209 |
300000 |
15T Sinking of Submarsel Pump at Bahadurpur near Rampada Mandal Plot 334 JL 2091 |
Completion of work |
-
latitude : 21.652283333333337
Longitude : 87.55346333333334
file name : Image_14032023092323646.png
|
2023-03-14 09:23:23.717463 |
322 |
46588422 |
15T Sinking of Submarsel Pump at Bahadurpur near Rampada Mandal Plot 334 JL 209 |
300000 |
15T Sinking of Submarsel Pump at Bahadurpur near Rampada Mandal Plot 334 JL 2091 |
Completion of work |
-
latitude : 21.652250000000002
Longitude : 87.55351333333334
file name : Image_14032023092408180.png
|
2023-03-14 09:24:08.249537 |
323 |
46611708 |
15T Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
225894 |
15T Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Completion of work |
-
latitude : 21.668818333333334
Longitude : 87.59680333333333
file name : Image_23032023142900426.png
|
2023-03-23 14:29:00.540412 |
324 |
46611708 |
15T Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
225894 |
15T Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Completion of work |
-
latitude : 21.668878333333335
Longitude : 87.59678666666666
file name : Image_23032023142938017.png
|
2023-03-23 14:29:38.087752 |
325 |
46611708 |
15T Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
225894 |
15T Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Completion of work |
-
latitude : 21.66877833333333
Longitude : 87.59679
file name : Image_23032023143013775.png
|
2023-03-23 14:30:13.852154 |
326 |
46611708 |
15T Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
225894 |
15T Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Completion of work |
-
latitude : 21.668785000000003
Longitude : 87.59684166666666
file name : Image_23032023143047492.png
|
2023-03-23 14:30:47.5701 |
327 |
46611708 |
15T Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 |
225894 |
15T Maintanence and running cost for Dublabari SWM Project JL 240 Plot 288 1 |
Completion of work |
-
latitude : 21.668819999999997
Longitude : 87.59675833333334
file name : Image_23032023143126460.png
|
2023-03-23 14:31:26.529228 |
328 |
56943807 |
CFC Upgradation of Tengramari ICDS Centre at Tengramari Sansad. Jl No. 235 Plot No.372 |
350000 |
CFC Upgradation of Tengramari ICDS Centre at Tengramari Sansad. Jl No. 235 Plot No.3721 |
Completion of work |
-
latitude : 21.657398333333337
Longitude : 87.594165
file name : Image_30032023140631495.png
|
2023-03-30 14:06:31.570777 |
329 |
56943807 |
CFC Upgradation of Tengramari ICDS Centre at Tengramari Sansad. Jl No. 235 Plot No.372 |
350000 |
CFC Upgradation of Tengramari ICDS Centre at Tengramari Sansad. Jl No. 235 Plot No.3721 |
Completion of work |
-
latitude : 21.657351666666667
Longitude : 87.59413666666666
file name : Image_30032023140709297.png
|
2023-03-30 14:07:09.384709 |
330 |
56943807 |
CFC Upgradation of Tengramari ICDS Centre at Tengramari Sansad. Jl No. 235 Plot No.372 |
350000 |
CFC Upgradation of Tengramari ICDS Centre at Tengramari Sansad. Jl No. 235 Plot No.3721 |
Completion of work |
-
latitude : 21.6578783
Longitude : 87.595029
file name : Image_30032023140749488.png
|
2023-03-30 14:07:49.56814 |
331 |
56762226 |
CFC Concrete road at Jaldha sansad from Mriganka Das house to Shambhu Jana house jl no 242 plot 812- |
150000 |
CFC Concrete road at Jaldha sansad from Mriganka Das house to Shambhu Jana house jl no 242 plot 812-1 |
Completion of work |
-
latitude : 21.648036666666666,21.648036666666666,21.648036666666666
Longitude : 87.60464166666667,87.60464333333333,87.60464333333333
file name : Image_30032023142457709.png
|
2023-03-30 14:24:57.828111 |
332 |
56762226 |
CFC Concrete road at Jaldha sansad from Mriganka Das house to Shambhu Jana house jl no 242 plot 812- |
150000 |
CFC Concrete road at Jaldha sansad from Mriganka Das house to Shambhu Jana house jl no 242 plot 812-1 |
Completion of work |
-
latitude : 21.648049999999998,21.648046666666666,21.648046666666666
Longitude : 87.60465166666667,87.60465666666666,87.60465666666666
file name : Image_30032023142612864.png
|
2023-03-30 14:26:12.957089 |
333 |
56762226 |
CFC Concrete road at Jaldha sansad from Mriganka Das house to Shambhu Jana house jl no 242 plot 812- |
150000 |
CFC Concrete road at Jaldha sansad from Mriganka Das house to Shambhu Jana house jl no 242 plot 812-1 |
Completion of work |
-
latitude : 21.648031666666665,21.648034999999997,21.648036666666666
Longitude : 87.60468333333334,87.60469166666665,87.60469499999999
file name : Image_30032023142648081.png
|
2023-03-30 14:26:48.197374 |
334 |
56747116 |
CFC Pucca drain at Deulbutta Sansad from PMGSY road to Dilip Bera Pond parh JL. No.-210,Plot No.-16- |
133000 |
CFC Pucca drain at Deulbutta Sansad from PMGSY road to Dilip Bera Pond parh JL. No.-210,Plot No.-16-1 |
Completion of work |
-
latitude : 21.664718333333333,21.664718333333333,21.664718333333333
Longitude : 87.55086333333333,87.55086333333333,87.55086333333333
file name : Image_30032023132404511.png
|
2023-03-30 13:24:04.59324 |
335 |
56747116 |
CFC Pucca drain at Deulbutta Sansad from PMGSY road to Dilip Bera Pond parh JL. No.-210,Plot No.-16- |
133000 |
CFC Pucca drain at Deulbutta Sansad from PMGSY road to Dilip Bera Pond parh JL. No.-210,Plot No.-16-1 |
Completion of work |
-
latitude : 21.664705000000005,21.664701666666662,21.664705000000005
Longitude : 87.55086666666666,87.55086333333333,87.55086166666666
file name : Image_30032023132444182.png
|
2023-03-30 13:24:44.264608 |
336 |
56747116 |
CFC Pucca drain at Deulbutta Sansad from PMGSY road to Dilip Bera Pond parh JL. No.-210,Plot No.-16- |
133000 |
CFC Pucca drain at Deulbutta Sansad from PMGSY road to Dilip Bera Pond parh JL. No.-210,Plot No.-16-1 |
Completion of work |
-
latitude : 21.66469833333333,21.66469833333333,21.664695
Longitude : 87.550845,87.550845,87.55085
file name : Image_30032023132536972.png
|
2023-03-30 13:25:37.046521 |
337 |
56755417 |
CFC Concrete road at Chandpur sansad from Jiban Krishna Pal house to Subal Pal house Jl No.237 plot |
100000 |
CFC Concrete road at Chandpur sansad from Jiban Krishna Pal house to Subal Pal house Jl No.237 plot 1 |
Completion of work |
-
latitude : 21.647138333333334,21.64714333333333,21.647141666666666
Longitude : 87.60005000000001,87.60005000000001,87.60005166666666
file name : Image_30032023141622422.png
|
2023-03-30 14:16:22.513658 |
338 |
56755417 |
CFC Concrete road at Chandpur sansad from Jiban Krishna Pal house to Subal Pal house Jl No.237 plot |
100000 |
CFC Concrete road at Chandpur sansad from Jiban Krishna Pal house to Subal Pal house Jl No.237 plot 1 |
Completion of work |
-
latitude : 21.647109999999998,21.647106666666666,21.647106666666666
Longitude : 87.60004166666667,87.60003833333333,87.60003833333333
file name : Image_30032023141657030.png
|
2023-03-30 14:16:57.108534 |
339 |
56755417 |
CFC Concrete road at Chandpur sansad from Jiban Krishna Pal house to Subal Pal house Jl No.237 plot |
100000 |
CFC Concrete road at Chandpur sansad from Jiban Krishna Pal house to Subal Pal house Jl No.237 plot 1 |
Completion of work |
-
latitude : 21.647136666666665,21.647136666666665,21.647136666666665
Longitude : 87.60004333333333,87.60004333333333,87.60004333333333
file name : Image_30032023141730719.png
|
2023-03-30 14:17:30.806024 |
340 |
46581629 |
15U Construction of Kitchen shed of ICDS at Kshirpal GS No 8 JL NO 238 Plot 194 Goal 9 |
100000 |
15U Construction of Kitchen shed of ICDS at Kshirpal GS No 8 JL NO 238 Plot 194 Goal 91 |
Completion of work |
-
latitude : 21.65734166666667
Longitude : 87.59854166666668
file name : Image_30032023152620096.png
|
2023-03-30 15:26:20.190304 |
341 |
46581629 |
15U Construction of Kitchen shed of ICDS at Kshirpal GS No 8 JL NO 238 Plot 194 Goal 9 |
100000 |
15U Construction of Kitchen shed of ICDS at Kshirpal GS No 8 JL NO 238 Plot 194 Goal 91 |
Completion of work |
-
latitude : 21.657349999999997
Longitude : 87.59854500000002
file name : Image_30032023152705829.png
|
2023-03-30 15:27:05.891569 |
342 |
46581629 |
15U Construction of Kitchen shed of ICDS at Kshirpal GS No 8 JL NO 238 Plot 194 Goal 9 |
100000 |
15U Construction of Kitchen shed of ICDS at Kshirpal GS No 8 JL NO 238 Plot 194 Goal 91 |
Completion of work |
-
latitude : 21.657333333333334
Longitude : 87.59856166666665
file name : Image_30032023152753140.png
|
2023-03-30 15:27:53.22253 |
343 |
46581629 |
15U Construction of Kitchen shed of ICDS at Kshirpal GS No 8 JL NO 238 Plot 194 Goal 9 |
100000 |
15U Construction of Kitchen shed of ICDS at Kshirpal GS No 8 JL NO 238 Plot 194 Goal 91 |
Completion of work |
-
latitude : 21.657339999999998
Longitude : 87.59859166666665
file name : Image_30032023152904701.png
|
2023-03-30 15:29:04.801713 |
344 |
56921045 |
CFC Sinking of Tara Pump near Pulin jana house at Tajpur sansad. Jl no.244 Plot no -200 |
100000 |
CFC Sinking of Tara Pump near Pulin jana house at Tajpur sansad. Jl no.244 Plot no -2001 |
Completion of work |
-
latitude : 21.65484333333333
Longitude : 87.61767333333334
file name : Image_25052023064859109.png
|
2023-05-25 06:48:59.192738 |
345 |
56921045 |
CFC Sinking of Tara Pump near Pulin jana house at Tajpur sansad. Jl no.244 Plot no -200 |
100000 |
CFC Sinking of Tara Pump near Pulin jana house at Tajpur sansad. Jl no.244 Plot no -2001 |
Completion of work |
-
latitude : 21.65481333333333
Longitude : 87.61770499999999
file name : Image_25052023064930007.png
|
2023-05-25 06:49:30.088214 |
346 |
56921045 |
CFC Sinking of Tara Pump near Pulin jana house at Tajpur sansad. Jl no.244 Plot no -200 |
100000 |
CFC Sinking of Tara Pump near Pulin jana house at Tajpur sansad. Jl no.244 Plot no -2001 |
Completion of work |
-
latitude : 21.654794999999996
Longitude : 87.61769000000001
file name : Image_25052023065003649.png
|
2023-05-25 06:50:03.754707 |
347 |
56923112 |
CFC Sinking of Submersible near Shitala Mandir at Dublabari Mouza under Tengramari Sansad. |
220000 |
CFC Sinking of Submersible near Shitala Mandir at Dublabari Mouza under Tengramari Sansad.1 |
Completion of work |
-
latitude : 21.669629999999998
Longitude : 87.60017500000001
file name : Image_24052023165817424.png
|
2023-05-24 16:58:17.511374 |
348 |
56923112 |
CFC Sinking of Submersible near Shitala Mandir at Dublabari Mouza under Tengramari Sansad. |
220000 |
CFC Sinking of Submersible near Shitala Mandir at Dublabari Mouza under Tengramari Sansad.1 |
Completion of work |
-
latitude : 21.669609999999995
Longitude : 87.60017
file name : Image_24052023165909570.png
|
2023-05-24 16:59:09.658 |
349 |
56923112 |
CFC Sinking of Submersible near Shitala Mandir at Dublabari Mouza under Tengramari Sansad. |
220000 |
CFC Sinking of Submersible near Shitala Mandir at Dublabari Mouza under Tengramari Sansad.1 |
Completion of work |
-
latitude : 21.669608333333333
Longitude : 87.60020833333334
file name : Image_24052023170002398.png
|
2023-05-24 17:00:02.503943 |
350 |
56760601 |
CFC Concrete road at Lachimpur sansad from Rajani Rout house to Raja Rout house jl no 236 Plot No 40 |
100000 |
CFC Concrete road at Lachimpur sansad from Rajani Rout house to Raja Rout house jl no 236 Plot No 401 |
Completion of work |
-
latitude : 21.643669999999997,21.643641666666667
Longitude : 87.59344166666666,87.59343500000001
file name : Image_24052023171923902.png
|
2023-05-24 17:19:23.973339 |
351 |
56760601 |
CFC Concrete road at Lachimpur sansad from Rajani Rout house to Raja Rout house jl no 236 Plot No 40 |
100000 |
CFC Concrete road at Lachimpur sansad from Rajani Rout house to Raja Rout house jl no 236 Plot No 401 |
Completion of work |
-
latitude : 21.643651666666663,21.643651666666663
Longitude : 87.59346166666667,87.59346
file name : Image_24052023172001339.png
|
2023-05-24 17:20:01.449841 |
352 |
56760601 |
CFC Concrete road at Lachimpur sansad from Rajani Rout house to Raja Rout house jl no 236 Plot No 40 |
100000 |
CFC Concrete road at Lachimpur sansad from Rajani Rout house to Raja Rout house jl no 236 Plot No 401 |
Completion of work |
-
latitude : 21.643655,21.64366
Longitude : 87.59337666666667,87.59337833333332
file name : Image_24052023172029976.png
|
2023-05-24 17:20:30.046365 |
353 |
56752636 |
CFC Concrete road at Bodhra Sansad from Bodhra Concrete road to Subhas Giri house J.l. no234 plot no |
100000 |
CFC Concrete road at Bodhra Sansad from Bodhra Concrete road to Subhas Giri house J.l. no234 plot no1 |
Completion of work |
-
latitude : 21.657963333333335,21.657963333333335
Longitude : 87.589705,87.589705
file name : Image_24052023172807931.png
|
2023-05-24 17:28:08.005718 |
354 |
56752636 |
CFC Concrete road at Bodhra Sansad from Bodhra Concrete road to Subhas Giri house J.l. no234 plot no |
100000 |
CFC Concrete road at Bodhra Sansad from Bodhra Concrete road to Subhas Giri house J.l. no234 plot no1 |
Completion of work |
-
latitude : 21.65793833333333,21.65793833333333
Longitude : 87.58963833333334,87.589635
file name : Image_24052023172838339.png
|
2023-05-24 17:28:38.42426 |
355 |
56752636 |
CFC Concrete road at Bodhra Sansad from Bodhra Concrete road to Subhas Giri house J.l. no234 plot no |
100000 |
CFC Concrete road at Bodhra Sansad from Bodhra Concrete road to Subhas Giri house J.l. no234 plot no1 |
Completion of work |
-
latitude : 21.657926666666672,21.657926666666672
Longitude : 87.58965333333332,87.58965333333332
file name : Image_24052023172908638.png
|
2023-05-24 17:29:08.708246 |
356 |
56752383 |
CFC Concrete road at Deulbutta Sansad from PMGSY to Nitai Patra house Jl no.209 Plot No.29-75 |
100000 |
CFC Concrete road at Deulbutta Sansad from PMGSY to Nitai Patra house Jl no.209 Plot No.29-751 |
Completion of work |
-
latitude : 21.664556666666666,21.664556666666666
Longitude : 87.55223166666669,87.55223166666669
file name : Image_25052023075645526.png
|
2023-05-25 07:56:45.604281 |
357 |
56752383 |
CFC Concrete road at Deulbutta Sansad from PMGSY to Nitai Patra house Jl no.209 Plot No.29-75 |
100000 |
CFC Concrete road at Deulbutta Sansad from PMGSY to Nitai Patra house Jl no.209 Plot No.29-751 |
Completion of work |
-
latitude : 21.664521666666662,21.66452333333333
Longitude : 87.55221666666667,87.55221833333331
file name : Image_25052023075714879.png
|
2023-05-25 07:57:14.959426 |
358 |
56752383 |
CFC Concrete road at Deulbutta Sansad from PMGSY to Nitai Patra house Jl no.209 Plot No.29-75 |
100000 |
CFC Concrete road at Deulbutta Sansad from PMGSY to Nitai Patra house Jl no.209 Plot No.29-751 |
Completion of work |
-
latitude : 21.664540000000002,21.664540000000002
Longitude : 87.552215,87.552215
file name : Image_25052023075745132.png
|
2023-05-25 07:57:45.209912 |
359 |
56939337 |
CFC Sinking of Submersible Pump near Mahadev Mandir at Jaldha Sansad. Jl No.242, Plot No.726 |
200000 |
CFC Sinking of Submersible Pump near Mahadev Mandir at Jaldha Sansad. Jl No.242, Plot No.7261 |
Completion of work |
-
latitude : 21.64984
Longitude : 87.60544666666668
file name : Image_24052023163712462.png
|
2023-05-24 16:37:12.535186 |
360 |
56939337 |
CFC Sinking of Submersible Pump near Mahadev Mandir at Jaldha Sansad. Jl No.242, Plot No.726 |
200000 |
CFC Sinking of Submersible Pump near Mahadev Mandir at Jaldha Sansad. Jl No.242, Plot No.7261 |
Completion of work |
-
latitude : 21.649876666666668
Longitude : 87.60547833333334
file name : Image_24052023163757444.png
|
2023-05-24 16:37:57.514466 |
361 |
56939337 |
CFC Sinking of Submersible Pump near Mahadev Mandir at Jaldha Sansad. Jl No.242, Plot No.726 |
200000 |
CFC Sinking of Submersible Pump near Mahadev Mandir at Jaldha Sansad. Jl No.242, Plot No.7261 |
Completion of work |
-
latitude : 21.649886666666664
Longitude : 87.60545166666667
file name : Image_24052023163838012.png
|
2023-05-24 16:38:38.090951 |
362 |
56921672 |
CFC Sinking of Submersible Pump near Nirmal Giri house at Kshirpal Sansad. JL No. 238 Plot No.237 |
200000 |
CFC Sinking of Submersible Pump near Nirmal Giri house at Kshirpal Sansad. JL No. 238 Plot No.2371 |
Completion of work |
-
latitude : 21.656616666666665
Longitude : 87.601505
file name : Image_24052023164750090.png
|
2023-05-24 16:47:50.204017 |
363 |
56921672 |
CFC Sinking of Submersible Pump near Nirmal Giri house at Kshirpal Sansad. JL No. 238 Plot No.237 |
200000 |
CFC Sinking of Submersible Pump near Nirmal Giri house at Kshirpal Sansad. JL No. 238 Plot No.2371 |
Completion of work |
-
latitude : 21.656663333333334
Longitude : 87.60148666666667
file name : Image_24052023164829658.png
|
2023-05-24 16:48:29.764011 |
364 |
56921672 |
CFC Sinking of Submersible Pump near Nirmal Giri house at Kshirpal Sansad. JL No. 238 Plot No.237 |
200000 |
CFC Sinking of Submersible Pump near Nirmal Giri house at Kshirpal Sansad. JL No. 238 Plot No.2371 |
Completion of work |
-
latitude : 21.656661666666665
Longitude : 87.60149166666666
file name : Image_24052023164903632.png
|
2023-05-24 16:49:03.739791 |
365 |
56764638 |
CFC Concrete guardwall at Deulbutta sansad near Sushanta Sau pond jl no.210 plot no 174 |
100000 |
CFC Concrete guardwall at Deulbutta sansad near Sushanta Sau pond jl no.210 plot no 1741 |
Completion of work |
-
latitude : 21.66397833333333
Longitude : 87.54928
file name : Image_25052023074605279.png
|
2023-05-25 07:46:05.35892 |
366 |
56764638 |
CFC Concrete guardwall at Deulbutta sansad near Sushanta Sau pond jl no.210 plot no 174 |
100000 |
CFC Concrete guardwall at Deulbutta sansad near Sushanta Sau pond jl no.210 plot no 1741 |
Completion of work |
-
latitude : 21.663940000000004
Longitude : 87.54931
file name : Image_25052023074636685.png
|
2023-05-25 07:46:36.757475 |
367 |
56764638 |
CFC Concrete guardwall at Deulbutta sansad near Sushanta Sau pond jl no.210 plot no 174 |
100000 |
CFC Concrete guardwall at Deulbutta sansad near Sushanta Sau pond jl no.210 plot no 1741 |
Completion of work |
-
latitude : 21.66395
Longitude : 87.54930666666665
file name : Image_25052023074707426.png
|
2023-05-25 07:47:07.499935 |
368 |
56940506 |
CFC Sinking of Submersible Pump near Jamini Maity house at Tengramari Sansad. Jl No.235 Plot No.1117 |
230000 |
CFC Sinking of Submersible Pump near Jamini Maity house at Tengramari Sansad. Jl No.235 Plot No.11171 |
Completion of work |
-
latitude : 21.64891
Longitude : 87.59390666666668
file name : Image_24052023171218508.png
|
2023-05-24 17:12:18.602328 |
369 |
56940506 |
CFC Sinking of Submersible Pump near Jamini Maity house at Tengramari Sansad. Jl No.235 Plot No.1117 |
230000 |
CFC Sinking of Submersible Pump near Jamini Maity house at Tengramari Sansad. Jl No.235 Plot No.11171 |
Completion of work |
-
latitude : 21.648933333333336
Longitude : 87.59393166666665
file name : Image_24052023171255201.png
|
2023-05-24 17:12:55.288658 |
370 |
56940506 |
CFC Sinking of Submersible Pump near Jamini Maity house at Tengramari Sansad. Jl No.235 Plot No.1117 |
230000 |
CFC Sinking of Submersible Pump near Jamini Maity house at Tengramari Sansad. Jl No.235 Plot No.11171 |
Completion of work |
-
latitude : 21.648933333333336
Longitude : 87.59392333333332
file name : Image_24052023171321927.png
|
2023-05-24 17:13:22.020832 |
371 |
56940989 |
CFC Sinking of Submersible near Debabrata Karan at Tengramari Sansad. Jl No. 235 Plot No. 282 |
215535 |
CFC Sinking of Submersible near Debabrata Karan at Tengramari Sansad. Jl No. 235 Plot No. 2821 |
Completion of work |
-
latitude : 21.6567
Longitude : 87.59622833333333
file name : Image_24052023162839494.png
|
2023-05-24 16:28:39.57973 |
372 |
56940989 |
CFC Sinking of Submersible near Debabrata Karan at Tengramari Sansad. Jl No. 235 Plot No. 282 |
215535 |
CFC Sinking of Submersible near Debabrata Karan at Tengramari Sansad. Jl No. 235 Plot No. 2821 |
Completion of work |
-
latitude : 21.656703333333333
Longitude : 87.59621
file name : Image_24052023162912456.png
|
2023-05-24 16:29:12.542253 |
373 |
56940989 |
CFC Sinking of Submersible near Debabrata Karan at Tengramari Sansad. Jl No. 235 Plot No. 282 |
215535 |
CFC Sinking of Submersible near Debabrata Karan at Tengramari Sansad. Jl No. 235 Plot No. 2821 |
Completion of work |
-
latitude : 21.656745
Longitude : 87.59621
file name : Image_24052023162943755.png
|
2023-05-24 16:29:43.847469 |
374 |
56950716 |
CFC Boundery Wall & Smasan Chullah at Dublabari Mouza under Tengramari Sansad. Jl No.240 Plot No.288 |
250000 |
CFC Boundery Wall & Smasan Chullah at Dublabari Mouza under Tengramari Sansad. Jl No.240 Plot No.2881 |
Completion of work |
-
latitude : 21.66715333333333
Longitude : 87.59676833333333
file name : Image_20072023123519094.png
|
2023-07-20 12:35:19.348126 |
375 |
56950716 |
CFC Boundery Wall & Smasan Chullah at Dublabari Mouza under Tengramari Sansad. Jl No.240 Plot No.288 |
250000 |
CFC Boundery Wall & Smasan Chullah at Dublabari Mouza under Tengramari Sansad. Jl No.240 Plot No.2881 |
Completion of work |
-
latitude : 21.66715333333333
Longitude : 87.59676499999999
file name : Image_20072023123600833.png
|
2023-07-20 12:36:01.079048 |
376 |
56950716 |
CFC Boundery Wall & Smasan Chullah at Dublabari Mouza under Tengramari Sansad. Jl No.240 Plot No.288 |
250000 |
CFC Boundery Wall & Smasan Chullah at Dublabari Mouza under Tengramari Sansad. Jl No.240 Plot No.2881 |
Completion of work |
-
latitude : 21.66719333333333
Longitude : 87.59676833333333
file name : Image_20072023123440469.png
|
2023-07-20 12:34:40.589943 |
377 |
56950285 |
CFC Upgradetion of Multi Purpose building near Shisu Bari at Bodhar Sansad. Jl no. -234 Plot No. 367 |
150000 |
CFC Upgradetion of Multi Purpose building near Shisu Bari at Bodhar Sansad. Jl no. -234 Plot No. 3671 |
Completion of work |
-
latitude : 21.65927333333333
Longitude : 87.58589500000001
file name : Image_20072023124437635.png
|
2023-07-20 12:44:37.843701 |
378 |
56950285 |
CFC Upgradetion of Multi Purpose building near Shisu Bari at Bodhar Sansad. Jl no. -234 Plot No. 367 |
150000 |
CFC Upgradetion of Multi Purpose building near Shisu Bari at Bodhar Sansad. Jl no. -234 Plot No. 3671 |
Completion of work |
-
latitude : 21.659303333333334
Longitude : 87.58592166666668
file name : Image_20072023124516024.png
|
2023-07-20 12:45:16.118207 |
379 |
56950285 |
CFC Upgradetion of Multi Purpose building near Shisu Bari at Bodhar Sansad. Jl no. -234 Plot No. 367 |
150000 |
CFC Upgradetion of Multi Purpose building near Shisu Bari at Bodhar Sansad. Jl no. -234 Plot No. 3671 |
Completion of work |
-
latitude : 21.659341666666666
Longitude : 87.58593833333335
file name : Image_20072023124555437.png
|
2023-07-20 12:45:55.54306 |
380 |
56939005 |
CFC Sinking of Submersible near Rabindra Dalai at Jaldha sansad. Jl No. 242, Plot -836 |
200000 |
CFC Sinking of Submersible near Rabindra Dalai at Jaldha sansad. Jl No. 242, Plot -8361 |
Completion of work |
-
latitude : 21.654423333333337
Longitude : 87.60964833333334
file name : Image_20072023115637101.png
|
2023-07-20 11:56:37.190887 |
381 |
56939005 |
CFC Sinking of Submersible near Rabindra Dalai at Jaldha sansad. Jl No. 242, Plot -836 |
200000 |
CFC Sinking of Submersible near Rabindra Dalai at Jaldha sansad. Jl No. 242, Plot -8361 |
Completion of work |
-
latitude : 21.654448333333335
Longitude : 87.60968166666667
file name : Image_20072023115712699.png
|
2023-07-20 11:57:12.821318 |
382 |
56939005 |
CFC Sinking of Submersible near Rabindra Dalai at Jaldha sansad. Jl No. 242, Plot -836 |
200000 |
CFC Sinking of Submersible near Rabindra Dalai at Jaldha sansad. Jl No. 242, Plot -8361 |
Completion of work |
-
latitude : 21.65443
Longitude : 87.60968833333332
file name : Image_20072023115745375.png
|
2023-07-20 11:57:45.460778 |
383 |
46582284 |
15U Construction of GARD wall at Bahadurpur near Jatindra Nath Jana res GS No 1 JL NO 209 Plot 80 |
100000 |
15U Construction of GARD wall at Bahadurpur near Jatindra Nath Jana res GS No 1 JL NO 209 Plot 80 1 |
Completion of work |
-
latitude : 21.662853333333334,21.662853333333334
Longitude : 87.55253499999999,87.55253499999999
file name : Image_20072023131236312.png
|
2023-07-20 13:12:36.431165 |
384 |
46582284 |
15U Construction of GARD wall at Bahadurpur near Jatindra Nath Jana res GS No 1 JL NO 209 Plot 80 |
100000 |
15U Construction of GARD wall at Bahadurpur near Jatindra Nath Jana res GS No 1 JL NO 209 Plot 80 1 |
Completion of work |
-
latitude : 21.66283,21.66283
Longitude : 87.55254500000001,87.55254500000001
file name : Image_20072023131324903.png
|
2023-07-20 13:13:25.016527 |
385 |
46582284 |
15U Construction of GARD wall at Bahadurpur near Jatindra Nath Jana res GS No 1 JL NO 209 Plot 80 |
100000 |
15U Construction of GARD wall at Bahadurpur near Jatindra Nath Jana res GS No 1 JL NO 209 Plot 80 1 |
Completion of work |
-
latitude : 21.66283,21.66283
Longitude : 87.55253833333333,87.55253666666667
file name : Image_20072023131410459.png
|
2023-07-20 13:14:10.637353 |
386 |
56918777 |
CFC Sinking of Submersible Pump near Ananta Shit House at Jashipur sansad. Jl. No.234 Plot No. 113 |
200000 |
CFC Sinking of Submersible Pump near Ananta Shit House at Jashipur sansad. Jl. No.234 Plot No. 1131 |
Completion of work |
-
latitude : 21.659155000000002
Longitude : 87.58383
file name : Image_31072023155512236.png
|
2023-07-31 15:55:12.321298 |
387 |
56918777 |
CFC Sinking of Submersible Pump near Ananta Shit House at Jashipur sansad. Jl. No.234 Plot No. 113 |
200000 |
CFC Sinking of Submersible Pump near Ananta Shit House at Jashipur sansad. Jl. No.234 Plot No. 1131 |
Completion of work |
-
latitude : 21.659171666666666
Longitude : 87.58386833333334
file name : Image_31072023155631234.png
|
2023-07-31 15:56:31.339908 |
388 |
56918777 |
CFC Sinking of Submersible Pump near Ananta Shit House at Jashipur sansad. Jl. No.234 Plot No. 113 |
200000 |
CFC Sinking of Submersible Pump near Ananta Shit House at Jashipur sansad. Jl. No.234 Plot No. 1131 |
Completion of work |
-
latitude : 21.65921166666667
Longitude : 87.58383666666666
file name : Image_31072023155731985.png
|
2023-07-31 15:57:32.069816 |
389 |
56918777 |
CFC Sinking of Submersible Pump near Ananta Shit House at Jashipur sansad. Jl. No.234 Plot No. 113 |
200000 |
CFC Sinking of Submersible Pump near Ananta Shit House at Jashipur sansad. Jl. No.234 Plot No. 1131 |
Completion of work |
-
latitude : 21.65918166666667
Longitude : 87.58383
file name : Image_31072023155922686.png
|
2023-07-31 15:59:22.770246 |
390 |
56762001 |
CFC Concrete road at Shankarpur sansad from Aghor Majhi house to Gramin Main road jl no 221 plot 237 |
120000 |
CFC Concrete road at Shankarpur sansad from Aghor Majhi house to Gramin Main road jl no 221 plot 2371 |
Completion of work |
-
latitude : 21.64536666666667,21.64536666666667
Longitude : 87.57461166666666,87.57461166666666
file name : Image_31072023160815864.png
|
2023-07-31 16:08:15.973753 |
391 |
56762001 |
CFC Concrete road at Shankarpur sansad from Aghor Majhi house to Gramin Main road jl no 221 plot 237 |
120000 |
CFC Concrete road at Shankarpur sansad from Aghor Majhi house to Gramin Main road jl no 221 plot 2371 |
Completion of work |
-
latitude : 21.64537833333333,21.64537833333333
Longitude : 87.57464166666665,87.57464166666665
file name : Image_31072023160851115.png
|
2023-07-31 16:08:51.322532 |
392 |
56762001 |
CFC Concrete road at Shankarpur sansad from Aghor Majhi house to Gramin Main road jl no 221 plot 237 |
120000 |
CFC Concrete road at Shankarpur sansad from Aghor Majhi house to Gramin Main road jl no 221 plot 2371 |
Completion of work |
-
latitude : 21.645403333333334,21.645403333333334
Longitude : 87.57464,87.57464
file name : Image_31072023160922646.png
|
2023-07-31 16:09:22.916485 |
393 |
56918587 |
CFC Sinking of Submersible Pump near Jhaugeria Pry. School at Jhaugeria sansad Jl No. 207 Plot No. 2 |
250000 |
CFC Sinking of Submersible Pump near Jhaugeria Pry. School at Jhaugeria sansad Jl No. 207 Plot No. 21 |
Completion of work |
-
latitude : 21.65171833333333
Longitude : 87.55884666666667
file name : Image_31072023161959200.png
|
2023-07-31 16:19:59.273522 |
394 |
56918587 |
CFC Sinking of Submersible Pump near Jhaugeria Pry. School at Jhaugeria sansad Jl No. 207 Plot No. 2 |
250000 |
CFC Sinking of Submersible Pump near Jhaugeria Pry. School at Jhaugeria sansad Jl No. 207 Plot No. 21 |
Completion of work |
-
latitude : 21.651755
Longitude : 87.55884166666668
file name : Image_31072023162100060.png
|
2023-07-31 16:21:00.130472 |
395 |
56918587 |
CFC Sinking of Submersible Pump near Jhaugeria Pry. School at Jhaugeria sansad Jl No. 207 Plot No. 2 |
250000 |
CFC Sinking of Submersible Pump near Jhaugeria Pry. School at Jhaugeria sansad Jl No. 207 Plot No. 21 |
Completion of work |
-
latitude : 21.651758333333337
Longitude : 87.55882166666667
file name : Image_31072023162156146.png
|
2023-07-31 16:21:56.224735 |
396 |
56937739 |
CFC Sinking of Submersible Pump near Gita Jana at ShankarpurSansad. Jl No.221, Plot No 129 |
200000 |
CFC Sinking of Submersible Pump near Gita Jana at ShankarpurSansad. Jl No.221, Plot No 1291 |
Completion of work |
-
latitude : 21.64168833333333
Longitude : 87.57879666666668
file name : Image_31072023163502982.png
|
2023-07-31 16:35:03.062819 |
397 |
56937739 |
CFC Sinking of Submersible Pump near Gita Jana at ShankarpurSansad. Jl No.221, Plot No 129 |
200000 |
CFC Sinking of Submersible Pump near Gita Jana at ShankarpurSansad. Jl No.221, Plot No 1291 |
Completion of work |
-
latitude : 21.641681666666667
Longitude : 87.578815
file name : Image_31072023163540730.png
|
2023-07-31 16:35:40.811131 |
398 |
56937739 |
CFC Sinking of Submersible Pump near Gita Jana at ShankarpurSansad. Jl No.221, Plot No 129 |
200000 |
CFC Sinking of Submersible Pump near Gita Jana at ShankarpurSansad. Jl No.221, Plot No 1291 |
Completion of work |
-
latitude : 21.641691666666663
Longitude : 87.57879833333332
file name : Image_31072023163615399.png
|
2023-07-31 16:36:15.489278 |
399 |
59468744 |
CFC Drain at Jaldha Sansad from Adhir Pradhan house to Sudhangshu Pradhan house Jl. No. 242 Plot No, |
200000 |
CFC Drain at Jaldha Sansad from Adhir Pradhan house to Sudhangshu Pradhan house Jl. No. 242 Plot No,1 |
Completion of work |
-
latitude : 21.64583,21.64583
Longitude : 87.60676166666666,87.60676166666666
file name : Image_29072023181950212.png
|
2023-07-29 18:19:50.284899 |
400 |
59468744 |
CFC Drain at Jaldha Sansad from Adhir Pradhan house to Sudhangshu Pradhan house Jl. No. 242 Plot No, |
200000 |
CFC Drain at Jaldha Sansad from Adhir Pradhan house to Sudhangshu Pradhan house Jl. No. 242 Plot No,1 |
Completion of work |
-
latitude : 21.645818333333334,21.645815000000002
Longitude : 87.60677499999998,87.60677833333332
file name : Image_29072023182027655.png
|
2023-07-29 18:20:27.736412 |
401 |
59468744 |
CFC Drain at Jaldha Sansad from Adhir Pradhan house to Sudhangshu Pradhan house Jl. No. 242 Plot No, |
200000 |
CFC Drain at Jaldha Sansad from Adhir Pradhan house to Sudhangshu Pradhan house Jl. No. 242 Plot No,1 |
Completion of work |
-
latitude : 21.64582833333333,21.64582833333333
Longitude : 87.60683666666667,87.60683666666667
file name : Image_29072023182106495.png
|
2023-07-29 18:21:06.573916 |
402 |
56952991 |
CFC Repairing Tube Well of Different Sansad under Talgachhari-II Sansad. |
250000 |
CFC Repairing Tube Well of Different Sansad under Talgachhari-II Sansad.1 |
Completion of work |
-
latitude : 21.6615658
Longitude : 87.5904711
file name : Image_05102023125411619.png
|
2023-10-05 12:54:11.710958 |
403 |
56952991 |
CFC Repairing Tube Well of Different Sansad under Talgachhari-II Sansad. |
250000 |
CFC Repairing Tube Well of Different Sansad under Talgachhari-II Sansad.1 |
Completion of work |
-
latitude : 21.657458333333338
Longitude : 87.59326166666666
file name : Image_05102023124217687.png
|
2023-10-05 12:42:17.81046 |
404 |
56952991 |
CFC Repairing Tube Well of Different Sansad under Talgachhari-II Sansad. |
250000 |
CFC Repairing Tube Well of Different Sansad under Talgachhari-II Sansad.1 |
Completion of work |
-
latitude : 21.655678333333338
Longitude : 87.60454999999999
file name : Image_05102023124203038.png
|
2023-10-05 12:42:03.13005 |
405 |
56952991 |
CFC Repairing Tube Well of Different Sansad under Talgachhari-II Sansad. |
250000 |
CFC Repairing Tube Well of Different Sansad under Talgachhari-II Sansad.2 |
Completion of work |
-
latitude : 21.65568166666667
Longitude : 87.60453166666666
file name : Image_05102023124207802.png
|
2023-10-05 12:42:07.917695 |
406 |
56952991 |
CFC Repairing Tube Well of Different Sansad under Talgachhari-II Sansad. |
250000 |
CFC Repairing Tube Well of Different Sansad under Talgachhari-II Sansad.5 |
Completion of work |
-
latitude : 21.655701666666666
Longitude : 87.604575
file name : Image_05102023124212886.png
|
2023-10-05 12:42:12.988915 |
407 |
56936708 |
CFC Sinking of Tara Pump near Tarani Rout at Lachimpur sansad JL no .236 Plot No 408 |
100000 |
CFC Sinking of Tara Pump near Tarani Rout at Lachimpur sansad JL no .236 Plot No 4081 |
Completion of work |
-
latitude : 21.643728333333335
Longitude : 87.59325666666668
file name : Image_06102023152453655.png
|
2023-10-06 15:24:53.74261 |
408 |
56936708 |
CFC Sinking of Tara Pump near Tarani Rout at Lachimpur sansad JL no .236 Plot No 408 |
100000 |
CFC Sinking of Tara Pump near Tarani Rout at Lachimpur sansad JL no .236 Plot No 4081 |
Completion of work |
-
latitude : 21.643696666666663
Longitude : 87.59325333333332
file name : Image_06102023152421065.png
|
2023-10-06 15:24:21.164619 |
409 |
56936708 |
CFC Sinking of Tara Pump near Tarani Rout at Lachimpur sansad JL no .236 Plot No 408 |
100000 |
CFC Sinking of Tara Pump near Tarani Rout at Lachimpur sansad JL no .236 Plot No 4081 |
Completion of work |
-
latitude : 21.643745
Longitude : 87.59321666666668
file name : Image_06102023151218852.png
|
2023-10-06 15:12:18.94015 |
410 |
56919031 |
CFC Sinking Of Tara Pump near Asim Pradhan at Chandpur sansad. Jl No. 2237 Plot No. 231 |
100000 |
CFC Sinking Of Tara Pump near Asim Pradhan at Chandpur sansad. Jl No. 2237 Plot No. 2311 |
Completion of work |
-
latitude : 21.64635333333333
Longitude : 87.59505333333333
file name : Image_06102023153300519.png
|
2023-10-06 15:33:00.654146 |
411 |
56919031 |
CFC Sinking Of Tara Pump near Asim Pradhan at Chandpur sansad. Jl No. 2237 Plot No. 231 |
100000 |
CFC Sinking Of Tara Pump near Asim Pradhan at Chandpur sansad. Jl No. 2237 Plot No. 2311 |
Completion of work |
-
latitude : 21.646326666666663
Longitude : 87.59508166666667
file name : Image_06102023153219804.png
|
2023-10-06 15:32:19.954606 |
412 |
56919031 |
CFC Sinking Of Tara Pump near Asim Pradhan at Chandpur sansad. Jl No. 2237 Plot No. 231 |
100000 |
CFC Sinking Of Tara Pump near Asim Pradhan at Chandpur sansad. Jl No. 2237 Plot No. 2311 |
Completion of work |
-
latitude : 21.646351666666668
Longitude : 87.59503000000001
file name : Image_06102023153141755.png
|
2023-10-06 15:31:41.971524 |
413 |
56920337 |
CFC Sinking of Submersible Pump near Animesh Sui at Chandpur Sansad jl no. 237 plot -147 |
200000 |
CFC Sinking of Submersible Pump near Animesh Sui at Chandpur Sansad jl no. 237 plot -1471 |
Completion of work |
-
latitude : 21.64741333333333
Longitude : 87.60020166666666
file name : Image_06102023145856292.png
|
2023-10-06 14:58:56.370054 |
414 |
56920337 |
CFC Sinking of Submersible Pump near Animesh Sui at Chandpur Sansad jl no. 237 plot -147 |
200000 |
CFC Sinking of Submersible Pump near Animesh Sui at Chandpur Sansad jl no. 237 plot -1471 |
Completion of work |
-
latitude : 21.64743
Longitude : 87.60018666666669
file name : Image_06102023145817099.png
|
2023-10-06 14:58:17.174468 |
415 |
56920337 |
CFC Sinking of Submersible Pump near Animesh Sui at Chandpur Sansad jl no. 237 plot -147 |
200000 |
CFC Sinking of Submersible Pump near Animesh Sui at Chandpur Sansad jl no. 237 plot -1471 |
Completion of work |
-
latitude : 21.64738
Longitude : 87.60014166666666
file name : Image_06102023145739536.png
|
2023-10-06 14:57:39.615409 |
416 |
46561592 |
15U Construction of Multipurpose Building at Kuliatta near Ananta Giri res GS No 4 JL NO 227 Plot |
150000 |
15U Construction of Multipurpose Building at Kuliatta near Ananta Giri res GS No 4 JL NO 227 Plot1 |
Completion of work |
-
latitude : 21.668015
Longitude : 87.57412500000001
file name : Image_05102023124556164.png
|
2023-10-05 12:45:57.458731 |
417 |
46561592 |
15U Construction of Multipurpose Building at Kuliatta near Ananta Giri res GS No 4 JL NO 227 Plot |
150000 |
15U Construction of Multipurpose Building at Kuliatta near Ananta Giri res GS No 4 JL NO 227 Plot1 |
Completion of work |
-
latitude : 21.668013333333338
Longitude : 87.57412166666667
file name : Image_05102023124512495.png
|
2023-10-05 12:45:13.865052 |
418 |
46561592 |
15U Construction of Multipurpose Building at Kuliatta near Ananta Giri res GS No 4 JL NO 227 Plot |
150000 |
15U Construction of Multipurpose Building at Kuliatta near Ananta Giri res GS No 4 JL NO 227 Plot1 |
Completion of work |
-
latitude : 21.66800166666667
Longitude : 87.57411166666667
file name : Image_05102023124426177.png
|
2023-10-05 12:44:26.588826 |
419 |
46561592 |
15U Construction of Multipurpose Building at Kuliatta near Ananta Giri res GS No 4 JL NO 227 Plot |
150000 |
15U Construction of Multipurpose Building at Kuliatta near Ananta Giri res GS No 4 JL NO 227 Plot1 |
Completion of work |
-
latitude : 21.668031666666668
Longitude : 87.57413333333334
file name : Image_05102023124344559.png
|
2023-10-05 12:43:44.770171 |
420 |
46561592 |
15U Construction of Multipurpose Building at Kuliatta near Ananta Giri res GS No 4 JL NO 227 Plot |
150000 |
15U Construction of Multipurpose Building at Kuliatta near Ananta Giri res GS No 4 JL NO 227 Plot1 |
Completion of work |
-
latitude : 21.668015
Longitude : 87.57412000000001
file name : Image_05102023124340170.png
|
2023-10-05 12:43:40.434655 |
421 |
46561592 |
15U Construction of Multipurpose Building at Kuliatta near Ananta Giri res GS No 4 JL NO 227 Plot |
150000 |
15U Construction of Multipurpose Building at Kuliatta near Ananta Giri res GS No 4 JL NO 227 Plot1 |
Completion of work |
-
latitude : 21.668031666666668
Longitude : 87.57411333333333
file name : Image_05102023124223244.png
|
2023-10-05 12:42:23.33665 |
422 |
56756220 |
CFC Concrete road at Kshirpal sansad from Ratan Pradhan house to Bhajaram Mal house jl no 238 plot 1 |
100000 |
CFC Concrete road at Kshirpal sansad from Ratan Pradhan house to Bhajaram Mal house jl no 238 plot 11 |
Completion of work |
-
latitude : 21.658036666666664,21.658035
Longitude : 87.60499166666665,87.60499166666665
file name : Image_05102023120438218.png
|
2023-10-05 12:04:39.389996 |
423 |
56756220 |
CFC Concrete road at Kshirpal sansad from Ratan Pradhan house to Bhajaram Mal house jl no 238 plot 1 |
100000 |
CFC Concrete road at Kshirpal sansad from Ratan Pradhan house to Bhajaram Mal house jl no 238 plot 11 |
Completion of work |
-
latitude : 21.658020000000004,21.658009999999997
Longitude : 87.60499666666668,87.60498333333335
file name : Image_05102023120357718.png
|
2023-10-05 12:03:58.221008 |
424 |
56756220 |
CFC Concrete road at Kshirpal sansad from Ratan Pradhan house to Bhajaram Mal house jl no 238 plot 1 |
100000 |
CFC Concrete road at Kshirpal sansad from Ratan Pradhan house to Bhajaram Mal house jl no 238 plot 11 |
Completion of work |
-
latitude : 21.658039999999996,21.658038333333334
Longitude : 87.60503333333332,87.60502999999999
file name : Image_05102023120247309.png
|
2023-10-05 12:02:48.201457 |
425 |
56756220 |
CFC Concrete road at Kshirpal sansad from Ratan Pradhan house to Bhajaram Mal house jl no 238 plot 1 |
100000 |
CFC Concrete road at Kshirpal sansad from Ratan Pradhan house to Bhajaram Mal house jl no 238 plot 11 |
Completion of work |
-
latitude : 21.65806,21.658095000000003
Longitude : 87.60503666666666,87.60505833333333
file name : Image_05102023120157617.png
|
2023-10-05 12:01:57.847453 |
426 |
56756220 |
CFC Concrete road at Kshirpal sansad from Ratan Pradhan house to Bhajaram Mal house jl no 238 plot 1 |
100000 |
CFC Concrete road at Kshirpal sansad from Ratan Pradhan house to Bhajaram Mal house jl no 238 plot 11 |
Completion of work |
-
latitude : 21.65758,21.65763666666667
Longitude : 87.604485,87.60457166666666
file name : Image_05102023120149394.png
|
2023-10-05 12:01:49.470823 |
427 |
67910087 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.6628886,21.6628886
Longitude : 87.5960789,87.5960789
file name : Image_16012024153208168.png
|
2024-01-16 15:32:08.264603 |
428 |
67910087 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.663588333333337,21.663588333333337
Longitude : 87.59611666666666,87.59611666666666
file name : Image_16012024152652834.png
|
2024-01-16 15:26:52.92732 |
429 |
67910087 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.662886,21.662886
Longitude : 87.5960811,87.5960811
file name : Image_11012024123258060.png
|
2024-01-11 12:32:58.154368 |
430 |
67910087 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.662886,21.662886
Longitude : 87.5960811,87.5960811
file name : Image_11012024123227985.png
|
2024-01-11 12:32:28.085617 |
431 |
67910087 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.662886,21.662886
Longitude : 87.5960811,87.5960811
file name : Image_11012024123156031.png
|
2024-01-11 12:31:56.139557 |
432 |
67909124 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.66067333333334,21.66067333333334
Longitude : 87.58021,87.58021
file name : Image_16012024145327205.png
|
2024-01-16 14:53:27.354048 |
433 |
67909124 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.656515,21.656515
Longitude : 87.60141333333334,87.60141333333334
file name : Image_16012024143959228.png
|
2024-01-16 14:39:59.317074 |
434 |
67909124 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.66064833333333,21.660651666666663
Longitude : 87.58011666666668,87.58011333333334
file name : Image_09012024140430798.png
|
2024-01-09 14:04:30.901886 |
435 |
67909124 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.66064666666667,21.660641666666667
Longitude : 87.58011333333334,87.58011333333334
file name : Image_09012024140351910.png
|
2024-01-09 14:03:52.058728 |
436 |
67909124 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.660598333333336,21.660598333333336
Longitude : 87.58011499999999,87.58011499999999
file name : Image_09012024140307852.png
|
2024-01-09 14:03:07.957082 |
437 |
67910191 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.65666666666667,21.656663333333334
Longitude : 87.60152833333335,87.60152166666667
file name : Image_16012024151717379.png
|
2024-01-16 15:17:17.486494 |
438 |
67910191 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.65662166666667,21.65662166666667
Longitude : 87.601415,87.601415
file name : Image_16012024124941083.png
|
2024-01-16 12:49:41.197722 |
439 |
67910191 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.65657666666667,21.65657666666667
Longitude : 87.60144833333334,87.60144833333334
file name : Image_16012024124935171.png
|
2024-01-16 12:49:35.321493 |
440 |
67910191 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.656703333333333,21.656701666666663
Longitude : 87.60144,87.60144333333334
file name : Image_11012024122505654.png
|
2024-01-11 12:25:05.772075 |
441 |
67910191 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.656713333333332,21.65671166666667
Longitude : 87.60149000000001,87.60148499999998
file name : Image_11012024122432502.png
|
2024-01-11 12:24:32.667106 |
442 |
67910191 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.65665,21.65665
Longitude : 87.60153333333334,87.60153333333334
file name : Image_11012024122344380.png
|
2024-01-11 12:23:44.489557 |
443 |
56749448 |
CFC Pucca drain at Tajpur Sansad from Chandra Sekhar Jana house to Bachu Mandal house jl no 244 plot |
300000 |
CFC Pucca drain at Tajpur Sansad from Chandra Sekhar Jana house to Bachu Mandal house jl no 244 plot1 |
Completion of work |
-
latitude : 21.656105000000004,21.656109999999998
Longitude : 87.62369666666667,87.62369500000001
file name : Image_11012024084432318.png
|
2024-01-11 08:44:32.407378 |
444 |
56749448 |
CFC Pucca drain at Tajpur Sansad from Chandra Sekhar Jana house to Bachu Mandal house jl no 244 plot |
300000 |
CFC Pucca drain at Tajpur Sansad from Chandra Sekhar Jana house to Bachu Mandal house jl no 244 plot1 |
Completion of work |
-
latitude : 21.656115,21.65611666666667
Longitude : 87.62371,87.62370166666666
file name : Image_11012024084359413.png
|
2024-01-11 08:43:59.500297 |
445 |
56749448 |
CFC Pucca drain at Tajpur Sansad from Chandra Sekhar Jana house to Bachu Mandal house jl no 244 plot |
300000 |
CFC Pucca drain at Tajpur Sansad from Chandra Sekhar Jana house to Bachu Mandal house jl no 244 plot1 |
Completion of work |
-
latitude : 21.656091666666665,21.656146666666668
Longitude : 87.62369833333332,87.62355666666666
file name : Image_11012024084321417.png
|
2024-01-11 08:43:21.509306 |
446 |
67903278 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.669608333333333
Longitude : 87.59848333333333
file name : Image_16012024154408532.png
|
2024-01-16 15:44:08.638357 |
447 |
67903278 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.6628912
Longitude : 87.5960774
file name : Image_16012024153727043.png
|
2024-01-16 15:37:27.136586 |
448 |
67903278 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.669539999999998
Longitude : 87.59847999999998
file name : Image_11012024123758944.png
|
2024-01-11 12:37:59.058305 |
449 |
67903278 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.669505000000004
Longitude : 87.5985
file name : Image_11012024123723811.png
|
2024-01-11 12:37:23.91976 |
450 |
67903278 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.669521666666665
Longitude : 87.59852833333335
file name : Image_11012024123646335.png
|
2024-01-11 12:36:46.446666 |
451 |
67910321 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.6589693,21.6589693
Longitude : 87.58962,87.58962
file name : Image_20012024152746259.png
|
2024-01-20 15:27:46.347274 |
452 |
67910321 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.6589693,21.6589693
Longitude : 87.58962,87.58962
file name : Image_20012024151658901.png
|
2024-01-20 15:16:58.995279 |
453 |
67910321 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.6784338,21.6784338
Longitude : 87.5637415,87.5637415
file name : Image_12012024123607291.png
|
2024-01-12 12:36:07.393388 |
454 |
67910321 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.6784338,21.6784338
Longitude : 87.5637415,87.5637415
file name : Image_12012024123529997.png
|
2024-01-12 12:35:30.136239 |
455 |
67910321 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.6784338,21.6784338
Longitude : 87.5637415,87.5637415
file name : Image_12012024123448697.png
|
2024-01-12 12:34:48.802214 |
456 |
67911613 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.657396666666667,21.657396666666667
Longitude : 87.61242333333333,87.61242333333333
file name : Image_16012024121255580.png
|
2024-01-16 12:12:55.670947 |
457 |
67911613 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.657375000000002,21.657393333333335
Longitude : 87.61238999999999,87.61238
file name : Image_16012024115738367.png
|
2024-01-16 11:57:38.466993 |
458 |
67911613 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.65735666666667,21.65735666666667
Longitude : 87.61235,87.61235
file name : Image_11012024110540583.png
|
2024-01-11 11:05:40.682363 |
459 |
67911613 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.657373333333332,21.657381666666666
Longitude : 87.61231666666666,87.61233166666668
file name : Image_11012024110501896.png
|
2024-01-11 11:05:01.994633 |
460 |
67911613 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.657348333333335,21.657346666666665
Longitude : 87.61230166666668,87.61230166666668
file name : Image_11012024110417703.png
|
2024-01-11 11:04:17.822746 |
461 |
67908735 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.647093333333334,21.64710166666667
Longitude : 87.60267333333334,87.60266833333331
file name : Image_16012024123246263.png
|
2024-01-16 12:32:46.35777 |
462 |
67908735 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.64713166666667,21.647135000000002
Longitude : 87.60268166666668,87.60268166666668
file name : Image_16012024122611011.png
|
2024-01-16 12:26:11.110845 |
463 |
67908735 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.647161666666662,21.64716
Longitude : 87.60269333333332,87.60269333333332
file name : Image_11012024121552171.png
|
2024-01-11 12:15:52.284412 |
464 |
67908735 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.647154999999998,21.647153333333335
Longitude : 87.60266833333331,87.60266500000002
file name : Image_11012024121521092.png
|
2024-01-11 12:15:21.203116 |
465 |
67908735 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.647180000000002,21.647184999999997
Longitude : 87.60269666666666,87.60269333333332
file name : Image_11012024121443123.png
|
2024-01-11 12:14:43.242715 |
466 |
67910844 |
Construction of Building |
150000 |
Construction of Building1 |
Roof laid |
-
latitude : 21.651995000000003
Longitude : 87.55214
file name : Image_19042024084255722.png
|
2024-04-19 08:42:55.801539 |
467 |
67910844 |
Construction of Building |
150000 |
Construction of Building1 |
Plinth level |
-
latitude : 21.65203166666667
Longitude : 87.55212333333333
file name : Image_19042024083808106.png
|
2024-04-19 08:38:08.183373 |
468 |
67910844 |
Construction of Building |
150000 |
Construction of Building1 |
Plinth level |
-
latitude : 21.65203166666667
Longitude : 87.55212333333333
file name : Image_19042024083804141.png
|
2024-04-19 08:38:04.225929 |
469 |
67910844 |
Construction of Building |
150000 |
Construction of Building1 |
Plinth level |
-
latitude : 21.652086666666666
Longitude : 87.55211833333333
file name : Image_19042024083758856.png
|
2024-04-19 08:37:58.940889 |
470 |
67910844 |
Construction of Building |
150000 |
Construction of Building1 |
Completion of work |
-
latitude : 21.651915
Longitude : 87.55205666666667
file name : Image_19042024073121509.png
|
2024-04-19 07:31:21.605086 |
471 |
67901649 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.654851666666666
Longitude : 87.63254833333333
file name : Image_27012024122219409.png
|
2024-01-27 12:22:19.504546 |
472 |
67901649 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.65485833333333
Longitude : 87.63255666666667
file name : Image_27012024121836189.png
|
2024-01-27 12:18:36.276973 |
473 |
67901649 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.65486
Longitude : 87.63253166666667
file name : Image_27012024121013290.png
|
2024-01-27 12:10:13.378312 |
474 |
67901460 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.65678666666667
Longitude : 87.62392
file name : Image_20012024162021534.png
|
2024-01-20 16:20:21.642008 |
475 |
67901460 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.656781666666667
Longitude : 87.62398333333334
file name : Image_20012024161738636.png
|
2024-01-20 16:17:38.756854 |
476 |
67901460 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.656781666666667
Longitude : 87.62398333333334
file name : Image_20012024161730360.png
|
2024-01-20 16:17:30.493352 |
477 |
67901460 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.656793333333333
Longitude : 87.62395166666666
file name : Image_20012024161727125.png
|
2024-01-20 16:17:27.222266 |
478 |
67901460 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.656793333333333
Longitude : 87.62395166666666
file name : Image_20012024161515219.png
|
2024-01-20 16:15:15.314395 |
479 |
67901460 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.656753333333334
Longitude : 87.62401166666665
file name : Image_20012024160955870.png
|
2024-01-20 16:09:55.967455 |
480 |
56765143 |
CFC Bolli Piling at Jhaugeria sansad near Dhiren Barai Pond Jl No. 207 Plot No. 357 |
150000 |
CFC Bolli Piling at Jhaugeria sansad near Dhiren Barai Pond Jl No. 207 Plot No. 3571 |
Roof laid |
-
latitude : 21.651365000000002
Longitude : 87.55980833333334
file name : Image_31012024131905229.png
|
2024-01-31 13:19:05.34826 |
481 |
56765143 |
CFC Bolli Piling at Jhaugeria sansad near Dhiren Barai Pond Jl No. 207 Plot No. 357 |
150000 |
CFC Bolli Piling at Jhaugeria sansad near Dhiren Barai Pond Jl No. 207 Plot No. 3571 |
Plinth level |
-
latitude : 21.65132833333333
Longitude : 87.55984666666667
file name : Image_31012024131603275.png
|
2024-01-31 13:16:03.393501 |
482 |
56765143 |
CFC Bolli Piling at Jhaugeria sansad near Dhiren Barai Pond Jl No. 207 Plot No. 357 |
150000 |
CFC Bolli Piling at Jhaugeria sansad near Dhiren Barai Pond Jl No. 207 Plot No. 3571 |
Completion of work |
-
latitude : 21.651336666666666
Longitude : 87.559795
file name : Image_31012024130932394.png
|
2024-01-31 13:09:32.528899 |
483 |
67897974 |
Creation of a new source of drinking water |
120000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 21.652504999999998
Longitude : 87.60515
file name : Image_20022024125122192.png
|
2024-02-20 12:51:22.347179 |
484 |
67897974 |
Creation of a new source of drinking water |
120000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.65252333333334
Longitude : 87.60515666666667
file name : Image_20022024124227398.png
|
2024-02-20 12:42:27.531581 |
485 |
67897974 |
Creation of a new source of drinking water |
120000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.652563333333333
Longitude : 87.60516666666666
file name : Image_20022024120919717.png
|
2024-02-20 12:09:19.827735 |
486 |
92974003 |
Construction of Concrete road at Lachhimpur sansad from Fanibhusan House to Lachhimpur MSK JL. 219 p |
100000 |
Construction of Concrete road at Lachhimpur sansad from Fanibhusan House to Lachhimpur MSK JL. 219 p1 |
Completion of work |
-
latitude : 21.6589753,21.6589753
Longitude : 87.589621,87.589621
file name : Image_20022024154343702.png
|
2024-02-20 15:43:43.79616 |
487 |
92974003 |
Construction of Concrete road at Lachhimpur sansad from Fanibhusan House to Lachhimpur MSK JL. 219 p |
100000 |
Construction of Concrete road at Lachhimpur sansad from Fanibhusan House to Lachhimpur MSK JL. 219 p1 |
Completion of work |
-
latitude : 21.6589753,21.6589753
Longitude : 87.589621,87.589621
file name : Image_20022024154238627.png
|
2024-02-20 15:42:38.744525 |
488 |
92974003 |
Construction of Concrete road at Lachhimpur sansad from Fanibhusan House to Lachhimpur MSK JL. 219 p |
100000 |
Construction of Concrete road at Lachhimpur sansad from Fanibhusan House to Lachhimpur MSK JL. 219 p1 |
Completion of work |
-
latitude : 21.6589753,21.6589753
Longitude : 87.589621,87.589621
file name : Image_20022024154140315.png
|
2024-02-20 15:41:40.419777 |
489 |
67896361 |
Creation of a new source of drinking water |
120000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 21.65100166666667
Longitude : 87.60284500000002
file name : Image_20022024132638410.png
|
2024-02-20 13:26:38.685011 |
490 |
67896361 |
Creation of a new source of drinking water |
120000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.651020000000003
Longitude : 87.60282166666666
file name : Image_20022024132024778.png
|
2024-02-20 13:20:24.884818 |
491 |
67896361 |
Creation of a new source of drinking water |
120000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.651008333333333
Longitude : 87.60283666666668
file name : Image_20022024130111601.png
|
2024-02-20 13:01:11.699465 |
492 |
67909956 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.65425833333334,21.65426
Longitude : 87.62313166666667,87.62313666666665
file name : Image_26042024075437015.png
|
2024-04-26 07:54:37.09817 |
493 |
67909956 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.654275,21.654275
Longitude : 87.62315166666667,87.62315166666667
file name : Image_26042024075151773.png
|
2024-04-26 07:51:51.858542 |
494 |
67909956 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.6547794,21.6547794
Longitude : 87.6232062,87.6232062
file name : Image_26042024074652373.png
|
2024-04-26 07:46:52.45687 |
495 |
67897806 |
Creation of a new source of drinking water |
225000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 21.64971666666667
Longitude : 87.57304500000001
file name : Image_21032024135018572.png
|
2024-03-21 13:50:18.702857 |
496 |
67897806 |
Creation of a new source of drinking water |
225000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.64970333333333
Longitude : 87.57303500000002
file name : Image_21032024134637649.png
|
2024-03-21 13:46:37.78905 |
497 |
67897806 |
Creation of a new source of drinking water |
225000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.64974666666667
Longitude : 87.573015
file name : Image_21032024134221068.png
|
2024-03-21 13:42:21.346626 |
498 |
59469980 |
CFC Community Toilet at Kshirpal Sansad at Kshirpal Stand. Jl. No. 238 Plot No. 514 |
150000 |
CFC Community Toilet at Kshirpal Sansad at Kshirpal Stand. Jl. No. 238 Plot No. 5141 |
Roof laid |
-
latitude : 21.6573244
Longitude : 87.5976023
file name : Image_21032024130318203.png
|
2024-03-21 13:03:18.301101 |
499 |
59469980 |
CFC Community Toilet at Kshirpal Sansad at Kshirpal Stand. Jl. No. 238 Plot No. 514 |
150000 |
CFC Community Toilet at Kshirpal Sansad at Kshirpal Stand. Jl. No. 238 Plot No. 5141 |
Roof laid |
-
latitude : 21.6573244
Longitude : 87.5976023
file name : Image_21032024130304551.png
|
2024-03-21 13:03:04.688269 |
500 |
59469980 |
CFC Community Toilet at Kshirpal Sansad at Kshirpal Stand. Jl. No. 238 Plot No. 514 |
150000 |
CFC Community Toilet at Kshirpal Sansad at Kshirpal Stand. Jl. No. 238 Plot No. 5141 |
Roof laid |
-
latitude : 21.6573244
Longitude : 87.5976023
file name : Image_21032024130308509.png
|
2024-03-21 13:03:08.631738 |
501 |
59469980 |
CFC Community Toilet at Kshirpal Sansad at Kshirpal Stand. Jl. No. 238 Plot No. 514 |
150000 |
CFC Community Toilet at Kshirpal Sansad at Kshirpal Stand. Jl. No. 238 Plot No. 5141 |
Plinth level |
-
latitude : 21.6573275
Longitude : 87.597602
file name : Image_21032024125854127.png
|
2024-03-21 12:58:54.216377 |
502 |
59469980 |
CFC Community Toilet at Kshirpal Sansad at Kshirpal Stand. Jl. No. 238 Plot No. 514 |
150000 |
CFC Community Toilet at Kshirpal Sansad at Kshirpal Stand. Jl. No. 238 Plot No. 5141 |
Completion of work |
-
latitude : 21.6573163
Longitude : 87.5975825
file name : Image_21032024125027938.png
|
2024-03-21 12:50:28.035821 |
503 |
67911487 |
Construction of Building |
100000 |
Construction of Building1 |
Roof laid |
-
latitude : 21.663214999999997
Longitude : 87.57681833333332
file name : Image_21032024123537461.png
|
2024-03-21 12:35:37.579694 |
504 |
67911487 |
Construction of Building |
100000 |
Construction of Building1 |
Plinth level |
-
latitude : 21.663225000000004
Longitude : 87.57683666666665
file name : Image_21032024123250847.png
|
2024-03-21 12:32:50.968016 |
505 |
67911487 |
Construction of Building |
100000 |
Construction of Building1 |
Completion of work |
-
latitude : 21.663296666666664
Longitude : 87.576805
file name : Image_21032024121254032.png
|
2024-03-21 12:12:54.15795 |
506 |
67902045 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.641276666666666
Longitude : 87.58024166666668
file name : Image_12092024150409051.png
|
2024-09-12 15:04:09.164704 |
507 |
67902045 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.641308333333335
Longitude : 87.58025500000001
file name : Image_12092024150018783.png
|
2024-09-12 15:00:18.866389 |
508 |
67902045 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.64134333333333
Longitude : 87.58028833333334
file name : Image_12092024145203333.png
|
2024-09-12 14:52:03.427458 |
509 |
67902045 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.641301666666664
Longitude : 87.58025833333335
file name : Image_12092024145159097.png
|
2024-09-12 14:51:59.179163 |
510 |
67902045 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.641230000000004
Longitude : 87.58026999999998
file name : Image_12092024145155096.png
|
2024-09-12 14:51:55.206095 |
511 |
67902045 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.64134333333333
Longitude : 87.58028833333334
file name : Image_12092024144945326.png
|
2024-09-12 14:49:45.409959 |
512 |
67902045 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.641301666666664
Longitude : 87.58025833333335
file name : Image_12092024144941158.png
|
2024-09-12 14:49:41.24883 |
513 |
67902045 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.641230000000004
Longitude : 87.58026999999998
file name : Image_12092024144937020.png
|
2024-09-12 14:49:37.106864 |
514 |
67902045 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.64129666666667
Longitude : 87.58007666666666
file name : Image_12092024144932712.png
|
2024-09-12 14:49:32.798452 |
515 |
67899660 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.656581666666664
Longitude : 87.59396833333334
file name : Image_24062024130524787.png
|
2024-06-24 13:05:24.936717 |
516 |
67899660 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.656686666666662
Longitude : 87.59399166666665
file name : Image_24062024130002148.png
|
2024-06-24 13:00:02.269979 |
517 |
67899660 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.65656166666667
Longitude : 87.59392666666666
file name : Image_24062024125657036.png
|
2024-06-24 12:56:57.139608 |
518 |
67900486 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.647190000000002
Longitude : 87.59550833333333
file name : Image_24062024124243702.png
|
2024-06-24 12:42:43.795476 |
519 |
67900486 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.64723333333333
Longitude : 87.59548500000001
file name : Image_24062024123445426.png
|
2024-06-24 12:34:45.52284 |
520 |
67900486 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.647175
Longitude : 87.59547666666667
file name : Image_24062024120526910.png
|
2024-06-24 12:05:27.005427 |
521 |
67900110 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.646425
Longitude : 87.59782166666668
file name : Image_28062024091254261.png
|
2024-06-28 09:12:54.348737 |
522 |
67900110 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.646428333333333
Longitude : 87.59779666666667
file name : Image_28062024090900152.png
|
2024-06-28 09:09:00.239456 |
523 |
67900110 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.646406666666667
Longitude : 87.59783999999999
file name : Image_28062024090512260.png
|
2024-06-28 09:05:12.356804 |
524 |
67912285 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.668156666666665,21.668156666666665
Longitude : 87.59924833333335,87.59924833333335
file name : Image_28062024095510298.png
|
2024-06-28 09:55:10.385216 |
525 |
67912285 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.668185,21.668185
Longitude : 87.59923833333332,87.59923833333332
file name : Image_28062024095126737.png
|
2024-06-28 09:51:26.834358 |
526 |
67912285 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.668203333333334,21.668198333333333
Longitude : 87.59922166666665,87.59922666666668
file name : Image_28062024094606918.png
|
2024-06-28 09:46:07.012916 |
527 |
67897006 |
Creation of a new source of drinking water |
225000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 21.65768166666667
Longitude : 87.58819
file name : Image_28062024135615067.png
|
2024-06-28 13:56:15.162117 |
528 |
67897006 |
Creation of a new source of drinking water |
225000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.657651666666666
Longitude : 87.58817333333333
file name : Image_28062024135223835.png
|
2024-06-28 13:52:23.935464 |
529 |
67897006 |
Creation of a new source of drinking water |
225000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.65771666666667
Longitude : 87.58816833333334
file name : Image_28062024134552235.png
|
2024-06-28 13:45:52.347015 |
530 |
67897195 |
Creation of a new source of drinking water |
225000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 21.65723666666667
Longitude : 87.58966000000001
file name : Image_28062024134416647.png
|
2024-06-28 13:44:16.767139 |
531 |
67897195 |
Creation of a new source of drinking water |
225000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.657086666666668
Longitude : 87.5894
file name : Image_28062024131920828.png
|
2024-06-28 13:19:20.968652 |
532 |
67897195 |
Creation of a new source of drinking water |
225000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.657196666666664
Longitude : 87.58973499999999
file name : Image_28062024120539182.png
|
2024-06-28 12:05:39.300646 |
533 |
67911747 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.655168333333336,21.655103333333333
Longitude : 87.60648,87.60651666666666
file name : Image_11072024121801210.png
|
2024-07-11 12:18:01.309925 |
534 |
67911747 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.655180000000005,21.655183333333337
Longitude : 87.60643999999999,87.60644499999998
file name : Image_11072024121253828.png
|
2024-07-11 12:12:53.931554 |
535 |
67911747 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.655163333333334,21.655163333333334
Longitude : 87.60640166666666,87.60640166666666
file name : Image_11072024114431234.png
|
2024-07-11 11:44:31.354139 |
536 |
67911747 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.655165000000004,21.655146666666663
Longitude : 87.60642166666666,87.60644833333332
file name : Image_11072024114419767.png
|
2024-07-11 11:44:19.875931 |
537 |
67911871 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.646833333333333,21.646838333333335
Longitude : 87.60434666666667,87.60434500000001
file name : Image_11072024113543257.png
|
2024-07-11 11:35:43.362779 |
538 |
67911871 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.646884999999997,21.646881666666665
Longitude : 87.60429500000001,87.60429666666666
file name : Image_11072024113156129.png
|
2024-07-11 11:31:56.216055 |
539 |
67911871 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.646808333333336,21.64686
Longitude : 87.60436,87.60435833333334
file name : Image_11072024110959235.png
|
2024-07-11 11:09:59.337358 |
540 |
67912135 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.674078333333334,21.674086666666668
Longitude : 87.59680000000002,87.59679833333333
file name : Image_14072024125155544.png
|
2024-07-14 12:51:55.633457 |
541 |
67912135 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.674106666666663,21.6741
Longitude : 87.59681166666665,87.59679333333334
file name : Image_14072024124839403.png
|
2024-07-14 12:48:39.494862 |
542 |
67912135 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.674081666666666,21.674081666666666
Longitude : 87.596845,87.596845
file name : Image_14072024124209948.png
|
2024-07-14 12:42:10.038081 |
543 |
67909754 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.6498612,21.6498612
Longitude : 87.5870218,87.5870218
file name : Image_14072024133146235.png
|
2024-07-14 13:31:46.328016 |
544 |
67909754 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.6498574,21.6498574
Longitude : 87.587023,87.587023
file name : Image_14072024131438123.png
|
2024-07-14 13:14:38.21352 |
545 |
67909754 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.649795,21.649795
Longitude : 87.58699666666668,87.58699666666668
file name : Image_14072024130907592.png
|
2024-07-14 13:09:07.679967 |
546 |
67902870 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.651845
Longitude : 87.552195
file name : Image_19072024144105671.png
|
2024-07-19 14:41:05.765696 |
547 |
67902870 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.651835
Longitude : 87.55219333333335
file name : Image_19072024143515275.png
|
2024-07-19 14:35:15.362264 |
548 |
67902870 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.651795
Longitude : 87.55215000000001
file name : Image_19072024143023962.png
|
2024-07-19 14:30:24.062354 |
549 |
67903829 |
Drainage Construction |
165535 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.657463333333332
Longitude : 87.59325333333332
file name : Image_29072024173031829.png
|
2024-07-29 17:30:31.940986 |
550 |
67903829 |
Drainage Construction |
165535 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.657463333333332
Longitude : 87.59323666666666
file name : Image_29072024172609283.png
|
2024-07-29 17:26:09.399098 |
551 |
67903829 |
Drainage Construction |
165535 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.65741166666667
Longitude : 87.59325833333332
file name : Image_29072024171635412.png
|
2024-07-29 17:16:35.500226 |
552 |
67903829 |
Drainage Construction |
165535 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.657481666666666
Longitude : 87.59332166666667
file name : Image_29072024171631397.png
|
2024-07-29 17:16:31.546254 |
553 |
67903829 |
Drainage Construction |
165535 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.657066666666665
Longitude : 87.58983000000002
file name : Image_29072024171627717.png
|
2024-07-29 17:16:27.816701 |
554 |
67903829 |
Drainage Construction |
165535 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.657079999999997
Longitude : 87.58985
file name : Image_29072024171623848.png
|
2024-07-29 17:16:23.938218 |
555 |
67908878 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.64766666666667,21.64766666666667
Longitude : 87.59786666666666,87.59786666666666
file name : Image_27072024133235503.png
|
2024-07-27 13:32:35.608954 |
556 |
67908878 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.647674999999996,21.647674999999996
Longitude : 87.59789833333335,87.59789833333335
file name : Image_27072024133001035.png
|
2024-07-27 13:30:01.142049 |
557 |
67908878 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.647658333333332,21.64766666666667
Longitude : 87.59788833333332,87.59792666666665
file name : Image_27072024132600397.png
|
2024-07-27 13:26:00.497239 |
558 |
67908878 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.647618333333337,21.64762,21.647618333333337
Longitude : 87.59789666666666,87.59791833333333,87.597925
file name : Image_27072024132426499.png
|
2024-07-27 13:24:26.609467 |
559 |
67897554 |
Creation of a new source of drinking water |
120000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 21.64313666666667
Longitude : 87.58283000000002
file name : Image_20082024163515488.png
|
2024-08-20 16:35:15.575869 |
560 |
67897554 |
Creation of a new source of drinking water |
120000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.643141666666665
Longitude : 87.58283833333334
file name : Image_20082024163225692.png
|
2024-08-20 16:32:25.788301 |
561 |
67897554 |
Creation of a new source of drinking water |
120000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.64312
Longitude : 87.58283666666667
file name : Image_20082024162656770.png
|
2024-08-20 16:26:56.882007 |
562 |
67903122 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.652298333333338
Longitude : 87.55228166666666
file name : Image_31072024164509589.png
|
2024-07-31 16:45:09.696367 |
563 |
67903122 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.65232
Longitude : 87.552285
file name : Image_31072024163951606.png
|
2024-07-31 16:39:51.692497 |
564 |
67903122 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.652253333333338
Longitude : 87.55222166666665
file name : Image_31072024163308989.png
|
2024-07-31 16:33:09.087133 |
565 |
67903633 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.657556666666665
Longitude : 87.59422
file name : Image_20072024172805014.png
|
2024-07-20 17:28:05.111478 |
566 |
67903633 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.65762666666667
Longitude : 87.5942
file name : Image_20072024172244179.png
|
2024-07-20 17:22:44.287172 |
567 |
67903633 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.657570000000003
Longitude : 87.59419666666666
file name : Image_20072024171636135.png
|
2024-07-20 17:16:36.216965 |
568 |
67911266 |
Construction of Building |
300000 |
Construction of Building1 |
Roof laid |
-
latitude : 21.645553333333336
Longitude : 87.57284
file name : Image_31072024161253321.png
|
2024-07-31 16:12:53.43346 |
569 |
67911266 |
Construction of Building |
300000 |
Construction of Building1 |
Plinth level |
-
latitude : 21.645521666666664
Longitude : 87.572715
file name : Image_31072024160033387.png
|
2024-07-31 16:00:33.511456 |
570 |
67911266 |
Construction of Building |
300000 |
Construction of Building1 |
Completion of work |
-
latitude : 21.645595000000004
Longitude : 87.57279500000001
file name : Image_31072024155052076.png
|
2024-07-31 15:50:52.181314 |
571 |
67896852 |
Creation of a new source of drinking water |
225000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 21.66293
Longitude : 87.58341999999999
file name : Image_24072024131703702.png
|
2024-07-24 13:17:03.793566 |
572 |
67896852 |
Creation of a new source of drinking water |
225000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.662936666666663
Longitude : 87.58342499999999
file name : Image_24072024131354961.png
|
2024-07-24 13:13:55.054016 |
573 |
67896852 |
Creation of a new source of drinking water |
225000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.662905000000002
Longitude : 87.58339833333334
file name : Image_24072024130747198.png
|
2024-07-24 13:07:47.408096 |
574 |
67901817 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.6572918
Longitude : 87.5975814
file name : Image_24072024172819971.png
|
2024-07-24 17:28:20.063435 |
575 |
67901817 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.6572917
Longitude : 87.5975814
file name : Image_24072024171404925.png
|
2024-07-24 17:14:05.030515 |
576 |
67901817 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.657331666666664
Longitude : 87.59759166666666
file name : Image_24072024165234016.png
|
2024-07-24 16:52:34.114364 |
577 |
67896575 |
Creation of a new source of drinking water |
225000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 21.64540833333333
Longitude : 87.60557833333333
file name : Image_27072024125442077.png
|
2024-07-27 12:54:42.183065 |
578 |
67896575 |
Creation of a new source of drinking water |
225000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.645445000000002
Longitude : 87.60555500000001
file name : Image_27072024125132844.png
|
2024-07-27 12:51:32.947885 |
579 |
67896575 |
Creation of a new source of drinking water |
225000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.645415000000003
Longitude : 87.60549833333334
file name : Image_27072024124717500.png
|
2024-07-27 12:47:17.613033 |
580 |
67909472 |
Construction of Building |
100000 |
Construction of Building1 |
Roof laid |
-
latitude : 21.65959666666667
Longitude : 87.581185
file name : Image_31072024153746112.png
|
2024-07-31 15:37:46.254778 |
581 |
67909472 |
Construction of Building |
100000 |
Construction of Building1 |
Plinth level |
-
latitude : 21.659518333333335
Longitude : 87.58125833333334
file name : Image_31072024153045652.png
|
2024-07-31 15:30:45.847357 |
582 |
67909472 |
Construction of Building |
100000 |
Construction of Building1 |
Completion of work |
-
latitude : 21.659516666666665
Longitude : 87.58129333333333
file name : Image_31072024152111441.png
|
2024-07-31 15:21:11.543872 |
583 |
67898138 |
Creation of a new source of drinking water |
225000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 21.64695166666667
Longitude : 87.60436833333333
file name : Image_27072024131035841.png
|
2024-07-27 13:10:35.957127 |
584 |
67898138 |
Creation of a new source of drinking water |
225000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.646931666666667
Longitude : 87.60436499999999
file name : Image_27072024130745056.png
|
2024-07-27 13:07:45.180758 |
585 |
67898138 |
Creation of a new source of drinking water |
225000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.646945
Longitude : 87.60435666666666
file name : Image_27072024130240405.png
|
2024-07-27 13:02:40.510824 |
586 |
67899887 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.651189999999996
Longitude : 87.58873333333334
file name : Image_06092024144055854.png
|
2024-09-06 14:41:42.836837 |
587 |
67899887 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.651243333333333
Longitude : 87.58874499999999
file name : Image_06092024143743272.png
|
2024-09-06 14:38:30.217378 |
588 |
67899887 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.658756666666665
Longitude : 87.58949499999999
file name : Image_06092024143316525.png
|
2024-09-06 14:33:16.640483 |
589 |
67908544 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.647655,21.64767
Longitude : 87.59636666666665,87.59635166666666
file name : Image_31072024132801492.png
|
2024-07-31 13:28:01.589089 |
590 |
67908544 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.647641666666665,21.647641666666665
Longitude : 87.59632500000001,87.59632500000001
file name : Image_31072024132152537.png
|
2024-07-31 13:21:52.6316 |
591 |
67908544 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.64762,21.64762,21.647623333333332
Longitude : 87.59619333333333,87.59619333333333,87.59623000000002
file name : Image_31072024131738134.png
|
2024-07-31 13:17:38.237875 |
592 |
67909004 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.651594999999997,21.651609999999998
Longitude : 87.58508666666667,87.58507999999999
file name : Image_16082024150727839.png
|
2024-08-16 15:07:27.942586 |
593 |
67909004 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.651578333333337,21.651578333333337
Longitude : 87.58515000000001,87.58515000000001
file name : Image_16082024150440495.png
|
2024-08-16 15:04:39.651845 |
594 |
67909004 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.65161666666667,21.65161833333333
Longitude : 87.58507999999999,87.58507833333333
file name : Image_16082024145913007.png
|
2024-08-16 14:59:12.784205 |
595 |
89840048 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.65911833333333,21.65911833333333
Longitude : 87.60477166666666,87.60477166666666
file name : Image_09112024131820607.png
|
2024-11-09 13:18:20.71167 |
596 |
89840048 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.659103333333338,21.659103333333338
Longitude : 87.60478833333333,87.60478833333333
file name : Image_09112024131234000.png
|
2024-11-09 13:12:34.106071 |
597 |
89840048 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.659128333333335,21.659128333333335
Longitude : 87.60477333333334,87.60477333333334
file name : Image_09112024130624968.png
|
2024-11-09 13:06:25.073323 |
598 |
89840048 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.659113333333334,21.659110000000002
Longitude : 87.60475166666666,87.60475166666666
file name : Image_09112024125135452.png
|
2024-11-09 12:51:35.542153 |
599 |
89836563 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.664405000000002,21.664405000000002
Longitude : 87.55418333333334,87.55418333333334
file name : Image_09112024140536529.png
|
2024-11-09 14:05:36.629375 |
600 |
89836563 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.66443333333333,21.66443333333333
Longitude : 87.55416500000001,87.55416500000001
file name : Image_09112024140255402.png
|
2024-11-09 14:02:55.493267 |
601 |
89836563 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.673989,21.673989
Longitude : 87.5505559,87.5505559
file name : Image_09112024140004138.png
|
2024-11-09 14:00:04.218117 |
602 |
89047952 |
Construction of roads |
180000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.661389999999997,21.661389999999997
Longitude : 87.58886333333334,87.58886333333334
file name : Image_09112024145703933.png
|
2024-11-09 14:57:04.044258 |
603 |
89047952 |
Construction of roads |
180000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.661381666666664,21.661381666666664
Longitude : 87.58882833333334,87.58882833333334
file name : Image_09112024145331350.png
|
2024-11-09 14:53:31.457196 |
604 |
89047952 |
Construction of roads |
180000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.661381666666664,21.661381666666664
Longitude : 87.58886333333334,87.58886333333334
file name : Image_09112024144950884.png
|
2024-11-09 14:49:50.997736 |
605 |
89051224 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.6509,21.6509
Longitude : 87.60743166666667,87.60743166666667
file name : Image_09112024122324681.png
|
2024-11-09 12:23:24.766913 |
606 |
89051224 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.650859999999998,21.650859999999998
Longitude : 87.60745666666665,87.60745666666665
file name : Image_09112024121143593.png
|
2024-11-09 12:11:43.688043 |
607 |
89051224 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.650908333333337,21.650908333333337
Longitude : 87.60743666666667,87.60743666666667
file name : Image_09112024120701858.png
|
2024-11-09 12:07:01.961512 |
608 |
89840588 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.64696666666667,21.64696666666667
Longitude : 87.60412999999998,87.60412999999998
file name : Image_09112024123709130.png
|
2024-11-09 12:37:07.589345 |
609 |
89840588 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.64696333333333,21.64696333333333
Longitude : 87.60415499999999,87.60415499999999
file name : Image_09112024123415609.png
|
2024-11-09 12:34:15.592073 |
610 |
89840588 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.647018333333335,21.647018333333335
Longitude : 87.60416333333333,87.60416333333333
file name : Image_09112024123137521.png
|
2024-11-09 12:31:37.598957 |
611 |
89059313 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.647291666666668,21.647291666666668
Longitude : 87.57310333333335,87.57310333333335
file name : Image_09112024142444853.png
|
2024-11-09 14:24:44.938459 |
612 |
89059313 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.647251666666662,21.647251666666662
Longitude : 87.57309666666667,87.57309666666667
file name : Image_09112024142139219.png
|
2024-11-09 14:21:39.305635 |
613 |
89059313 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.647240000000004,21.647240000000004
Longitude : 87.57309500000001,87.57309500000001
file name : Image_09112024141852330.png
|
2024-11-09 14:18:52.415619 |
614 |
89837959 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.661550000000002,21.661550000000002
Longitude : 87.58162333333333,87.58162333333333
file name : Image_09112024151212465.png
|
2024-11-09 15:12:12.569422 |
615 |
89837959 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.661505000000002,21.661505000000002
Longitude : 87.58164333333335,87.58164333333335
file name : Image_09112024150815999.png
|
2024-11-09 15:08:16.079649 |
616 |
89837959 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.661520000000003,21.661520000000003
Longitude : 87.58163,87.58163
file name : Image_09112024150459253.png
|
2024-11-09 15:04:59.338655 |
617 |
67903473 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.652578333333334
Longitude : 87.60765
file name : Image_12112024092740567.png
|
2024-11-12 09:27:40.654985 |
618 |
67903473 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.65256
Longitude : 87.60765166666667
file name : Image_12112024091346723.png
|
2024-11-12 09:13:46.848557 |
619 |
67903473 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.652555
Longitude : 87.60766166666666
file name : Image_12112024091204403.png
|
2024-11-12 09:12:04.492075 |
620 |
67903473 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.652566666666665
Longitude : 87.6077
file name : Image_12112024085701641.png
|
2024-11-12 08:57:01.733295 |
621 |
89775388 |
Drainage Construction |
185000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.65037333333333
Longitude : 87.596935
file name : Image_12112024113646154.png
|
2024-11-12 11:36:46.245531 |
622 |
89775388 |
Drainage Construction |
185000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.650401666666667
Longitude : 87.59694166666668
file name : Image_12112024113411032.png
|
2024-11-12 11:34:11.133441 |
623 |
89775388 |
Drainage Construction |
185000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.650425000000002
Longitude : 87.59692666666666
file name : Image_12112024113007017.png
|
2024-11-12 11:30:07.108313 |
624 |
89839336 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.651471666666666,21.651471666666666
Longitude : 87.55720500000001,87.55720500000001
file name : Image_18112024130027353.png
|
2024-11-18 13:00:27.433129 |
625 |
89839336 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.651473333333335,21.651473333333335
Longitude : 87.55719666666667,87.55719666666667
file name : Image_18112024125653411.png
|
2024-11-18 12:56:53.500413 |
626 |
89839336 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.65144666666667,21.65144833333333
Longitude : 87.55720500000001,87.55720000000001
file name : Image_18112024125259825.png
|
2024-11-18 12:52:59.915754 |
627 |
89777194 |
Drainage Construction |
160000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.651239999999998
Longitude : 87.58801166666666
file name : Image_21112024140204973.png
|
2024-11-21 14:02:05.055039 |
628 |
89777194 |
Drainage Construction |
160000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.651253333333337
Longitude : 87.58798499999999
file name : Image_21112024135913819.png
|
2024-11-21 13:59:13.936745 |
629 |
89777194 |
Drainage Construction |
160000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.651255
Longitude : 87.58800166666667
file name : Image_21112024135029872.png
|
2024-11-21 13:50:29.960366 |
630 |
89118674 |
Drainage Construction |
185000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.66903166666667
Longitude : 87.59881333333333
file name : Image_21112024145325156.png
|
2024-11-21 14:53:25.258523 |
631 |
89118674 |
Drainage Construction |
185000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.66904833333333
Longitude : 87.59875333333333
file name : Image_21112024142956970.png
|
2024-11-21 14:29:57.083224 |
632 |
89118674 |
Drainage Construction |
185000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.66906333333333
Longitude : 87.59879000000001
file name : Image_21112024142342739.png
|
2024-11-21 14:23:42.868707 |