1 |
49026212 |
Praymary school to ICDS Drain at Birajpur |
158956 |
Praymary school to ICDS Drain at Birajpur1 |
Roof laid |
-
latitude : 22.83712344
Longitude : 87.48084404
file name : Image_29112022144942974.png
|
2022-11-29 14:49:43.082157 |
2 |
49026212 |
Praymary school to ICDS Drain at Birajpur |
158956 |
Praymary school to ICDS Drain at Birajpur1 |
Plinth level |
-
latitude : 22.83727803
Longitude : 87.48081247
file name : Image_29112022123238585.png
|
2022-11-29 12:32:38.729658 |
3 |
49026212 |
Praymary school to ICDS Drain at Birajpur |
158956 |
Praymary school to ICDS Drain at Birajpur1 |
Completion of work |
-
latitude : 22.837136
Longitude : 87.48089914
file name : Image_18112022121520504.png
|
2022-11-18 12:15:20.6111 |
4 |
59981736 |
Re-Excavation of Concrete Drain at Uttar Kharkusma |
75000 |
Re-Excavation of Concrete Drain at Uttar Kharkusma1 |
Roof laid |
-
latitude : 22.8671768,22.8671768
Longitude : 87.4305113,87.4305113
file name : Image_21122022125153582.png
|
2022-12-21 12:51:53.698708 |
5 |
59981736 |
Re-Excavation of Concrete Drain at Uttar Kharkusma |
75000 |
Re-Excavation of Concrete Drain at Uttar Kharkusma1 |
Plinth level |
-
latitude : 22.86773823,22.86773823,22.86773823
Longitude : 87.43109351,87.43109351,87.43109351
file name : Image_12122022143233301.png
|
2022-12-12 14:32:33.392942 |
6 |
59981736 |
Re-Excavation of Concrete Drain at Uttar Kharkusma |
75000 |
Re-Excavation of Concrete Drain at Uttar Kharkusma1 |
Completion of work |
-
latitude : 22.86773316,22.8676683,22.8676683,22.8676683,22.8676683,22.8676683,22.86770753
Longitude : 87.43108623,87.43099481,87.43099481,87.43099481,87.43099481,87.43099481,87.43108151
file name : Image_12122022143004270.png
|
2022-12-12 14:30:04.379604 |
7 |
59937920 |
Solatutbar ICDS repair |
84590 |
Solatutbar ICDS repair1 |
Plinth level |
-
latitude : 22.86236978
Longitude : 87.42701661
file name : Image_19012023125748176.png
|
2023-01-19 12:57:48.292447 |
8 |
59937920 |
Solatutbar ICDS repair |
84590 |
Solatutbar ICDS repair1 |
Roof laid |
-
latitude : 22.86240292
Longitude : 87.42704964
file name : Image_19012023130050000.png
|
2023-01-19 13:00:50.110056 |
9 |
59937920 |
Solatutbar ICDS repair |
84590 |
Solatutbar ICDS repair1 |
Plinth level |
-
latitude : 22.86234278
Longitude : 87.42707449
file name : Image_12012023171224048.png
|
2023-01-12 17:12:24.128764 |
10 |
59937920 |
Solatutbar ICDS repair |
84590 |
Solatutbar ICDS repair1 |
Completion of work |
-
latitude : 22.86239317
Longitude : 87.42698791
file name : Image_12012023170956746.png
|
2023-01-12 17:09:56.838665 |
11 |
59984964 |
Installation of sub Marsibal pump with Tank Baladghata Purba para at Baladghata |
144357 |
Installation of sub Marsibal pump with Tank Baladghata Purba para at Baladghata1 |
Roof laid |
-
latitude : 22.84978689
Longitude : 87.48145002
file name : Image_02012023141702849.png
|
2023-01-02 14:17:02.945974 |
12 |
59984964 |
Installation of sub Marsibal pump with Tank Baladghata Purba para at Baladghata |
144357 |
Installation of sub Marsibal pump with Tank Baladghata Purba para at Baladghata1 |
Plinth level |
-
latitude : 22.84974492
Longitude : 87.48153601
file name : Image_02012023141340985.png
|
2023-01-02 14:13:41.073535 |
13 |
59984964 |
Installation of sub Marsibal pump with Tank Baladghata Purba para at Baladghata |
144357 |
Installation of sub Marsibal pump with Tank Baladghata Purba para at Baladghata1 |
Plinth level |
-
latitude : 22.84977493
Longitude : 87.48145853
file name : Image_02012023141401392.png
|
2023-01-02 14:14:01.484176 |
14 |
59984964 |
Installation of sub Marsibal pump with Tank Baladghata Purba para at Baladghata |
144357 |
Installation of sub Marsibal pump with Tank Baladghata Purba para at Baladghata1 |
Plinth level |
-
latitude : 22.84977493
Longitude : 87.48145853
file name : Image_02012023141410021.png
|
2023-01-02 14:14:10.121034 |
15 |
59984964 |
Installation of sub Marsibal pump with Tank Baladghata Purba para at Baladghata |
144357 |
Installation of sub Marsibal pump with Tank Baladghata Purba para at Baladghata1 |
Completion of work |
-
latitude : 22.84932
Longitude : 87.48156828
file name : Image_12122022140523115.png
|
2022-12-12 14:05:23.206207 |
16 |
60001527 |
Installation & repair Of Street light near adar Khan House at Solatutbar |
95000 |
Installation & repair Of Street light near adar Khan House at Solatutbar1 |
Roof laid |
-
latitude : 22.86298006
Longitude : 87.42697075
file name : Image_02012023132904054.png
|
2023-01-02 13:29:04.149165 |
17 |
60001527 |
Installation & repair Of Street light near adar Khan House at Solatutbar |
95000 |
Installation & repair Of Street light near adar Khan House at Solatutbar1 |
Plinth level |
-
latitude : 22.86299697
Longitude : 87.42699637
file name : Image_21122022125726797.png
|
2022-12-21 12:57:26.92049 |
18 |
60001527 |
Installation & repair Of Street light near adar Khan House at Solatutbar |
95000 |
Installation & repair Of Street light near adar Khan House at Solatutbar1 |
Completion of work |
-
latitude : 22.86019489
Longitude : 87.43157488
file name : Image_12112022153920751.png
|
2022-11-12 15:39:20.838786 |
19 |
46761969 |
Instalation of Low musk light at Sabir khan house at Solatutbar |
100000 |
Instalation of Low musk light at Sabir khan house at Solatutbar1 |
Roof laid |
-
latitude : 22.86293409
Longitude : 87.42693022
file name : Image_05012023124845782.png
|
2023-01-05 12:48:45.90229 |
20 |
46761969 |
Instalation of Low musk light at Sabir khan house at Solatutbar |
100000 |
Instalation of Low musk light at Sabir khan house at Solatutbar1 |
Plinth level |
-
latitude : 22.86292001
Longitude : 87.4269017
file name : Image_05012023124716022.png
|
2023-01-05 12:47:16.129938 |
21 |
46761969 |
Instalation of Low musk light at Sabir khan house at Solatutbar |
100000 |
Instalation of Low musk light at Sabir khan house at Solatutbar1 |
Completion of work |
-
latitude : 22.8630394
Longitude : 87.42710646
file name : Image_05012023124429958.png
|
2023-01-05 12:44:30.070755 |
22 |
48990393 |
Repair & Mantanance of SWM Plant |
153433 |
Repair & Mantanance of SWM Plant1 |
Roof laid |
-
latitude : 22.84665675,22.84665675
Longitude : 87.41136037,87.41136037
file name : Image_10022023130154417.png
|
2023-02-10 13:01:54.506114 |
23 |
48990393 |
Repair & Mantanance of SWM Plant |
153433 |
Repair & Mantanance of SWM Plant1 |
Plinth level |
-
latitude : 22.84646132,22.84646132
Longitude : 87.41155762,87.41155762
file name : Image_28012023121104768.png
|
2023-01-28 12:11:04.863285 |
24 |
48990393 |
Repair & Mantanance of SWM Plant |
153433 |
Repair & Mantanance of SWM Plant1 |
Plinth level |
-
latitude : 22.84651776,22.84651774
Longitude : 87.4114765,87.41147647
file name : Image_13012023122825376.png
|
2023-01-13 12:28:25.47721 |
25 |
48990393 |
Repair & Mantanance of SWM Plant |
153433 |
Repair & Mantanance of SWM Plant1 |
Completion of work |
-
latitude : 22.84651625,22.84651625
Longitude : 87.41153403,87.41153403
file name : Image_13012023122522906.png
|
2023-01-13 12:25:23.007597 |
26 |
66830660 |
WAB CEMERA AND COMPUTER REPARING AT G.P OFFICE |
350000 |
WAB CEMERA AND COMPUTER REPARING AT G.P OFFICE1 |
Completion of work |
-
latitude : 22.8539783
Longitude : 87.4305641
file name : Image_27022023142011005.png
|
2023-02-27 14:20:11.08603 |
27 |
66830660 |
WAB CEMERA AND COMPUTER REPARING AT G.P OFFICE |
350000 |
WAB CEMERA AND COMPUTER REPARING AT G.P OFFICE1 |
Plinth level |
-
latitude : 22.8539793
Longitude : 87.430561
file name : Image_27022023142131105.png
|
2023-02-27 14:21:31.186782 |
28 |
66830660 |
WAB CEMERA AND COMPUTER REPARING AT G.P OFFICE |
350000 |
WAB CEMERA AND COMPUTER REPARING AT G.P OFFICE1 |
Roof laid |
-
latitude : 22.8539774
Longitude : 87.4305631
file name : Image_27022023142245736.png
|
2023-02-27 14:22:45.813907 |
29 |
36021962 |
Installition of pipe line from masjid more to pry. School at Madnahari |
138924 |
Installition of pipe line from masjid more to pry. School at Madnahari1 |
Completion of work |
-
latitude : 22.86332333333333,22.863314999999997
Longitude : 87.42587,87.42585666666668
file name : Image_05012022120245541.png
|
2022-01-05 12:02:45.638911 |
30 |
39111068 |
Re-Excavation of Road Side Drain at Baladghata |
50000 |
Re-Excavation of Road Side Drain at Baladghata1 |
Plinth level |
-
latitude : 22.831575013697147,22.831575642339885
Longitude : 87.46320627629757,87.4632061086595
file name : Image_03012022133413177.png
|
2022-01-03 13:34:13.313982 |
31 |
39111068 |
Re-Excavation of Road Side Drain at Baladghata |
50000 |
Re-Excavation of Road Side Drain at Baladghata1 |
Plinth level |
-
latitude : 22.83161403145641,22.831606529653072
Longitude : 87.4632066115737,87.46321398764849
file name : Image_03012022132851193.png
|
2022-01-03 13:28:51.321918 |
32 |
39111068 |
Re-Excavation of Road Side Drain at Baladghata |
50000 |
Re-Excavation of Road Side Drain at Baladghata1 |
Completion of work |
-
latitude : 22.830131666666663,22.830131666666663
Longitude : 87.47180000000002,87.47180000000002
file name : Image_24122021132457486.png
|
2021-12-24 13:24:57.602626 |
33 |
39106339 |
Construction Of Concrete Drain from Nurhusen Mandal Home Maja Bhangi home at Mathuri |
335671 |
Construction Of Concrete Drain from Nurhusen Mandal Home Maja Bhangi home at Mathuri 1 |
Completion of work |
-
latitude : 22.862763333333337,22.862765
Longitude : 87.43274333333332,87.43273166666668
file name : Image_21122021162515874.png
|
2021-12-21 16:25:15.980022 |
34 |
39108536 |
Re-Excavation of Road Side Drain at Pathartoria |
55500 |
Re-Excavation of Road Side Drain at Pathartoria 1 |
Roof laid |
-
latitude : 22.829849431291223,22.829843647778034
Longitude : 87.47225102037191,87.47225806117058
file name : Image_03012022134919742.png
|
2022-01-03 13:49:19.845192 |
35 |
39108536 |
Re-Excavation of Road Side Drain at Pathartoria |
55500 |
Re-Excavation of Road Side Drain at Pathartoria 1 |
Plinth level |
-
latitude : 22.82982973381877,22.82984704244882
Longitude : 87.47231614775956,87.47230441309512
file name : Image_03012022133955731.png
|
2022-01-03 13:39:55.847495 |
36 |
39108536 |
Re-Excavation of Road Side Drain at Pathartoria |
55500 |
Re-Excavation of Road Side Drain at Pathartoria 1 |
Completion of work |
-
latitude : 22.831725,22.831723333333336
Longitude : 87.46320666666666,87.46320833333333
file name : Image_24122021133653595.png
|
2021-12-24 13:36:53.697176 |
37 |
39106258 |
Construction Of Concrete Drain from Pitchrasta to Baramtala at Baladghata |
290000 |
Construction Of Concrete Drain from Pitchrasta to Baramtala at Baladghata 1 |
Roof laid |
-
latitude : 22.84770925529301,22.847653683274984
Longitude : 87.47829051688313,87.47838255017996
file name : Image_02052022124754254.png
|
2022-05-02 12:47:54.372807 |
38 |
39106258 |
Construction Of Concrete Drain from Pitchrasta to Baramtala at Baladghata |
290000 |
Construction Of Concrete Drain from Pitchrasta to Baramtala at Baladghata 1 |
Plinth level |
-
latitude : 22.847576653584838,22.847577575594187
Longitude : 87.47784275561571,87.47781375423074
file name : Image_02052022124327614.png
|
2022-05-02 12:43:27.72898 |
39 |
39106258 |
Construction Of Concrete Drain from Pitchrasta to Baramtala at Baladghata |
290000 |
Construction Of Concrete Drain from Pitchrasta to Baramtala at Baladghata 1 |
Completion of work |
-
latitude : 22.84768176265061,22.847716505639255
Longitude : 87.4777877703309,87.4778347928077
file name : Image_02052022124042818.png
|
2022-05-02 12:40:42.931872 |
40 |
34805276 |
Construction Of Concrete road from main road to Pursusa adibasi Para at Pursusa |
325726 |
Construction Of Concrete road from main road to Pursusa adibasi Para at Pursusa1 |
Completion of work |
-
latitude : 22.839491666666664,22.839491666666664
Longitude : 87.41962333333335,87.41962333333335
file name : Image_20122021134900227.png
|
2021-12-20 13:49:00.345359 |
41 |
34805276 |
Construction Of Concrete road from main road to Pursusa adibasi Para at Pursusa |
325726 |
Construction Of Concrete road from main road to Pursusa adibasi Para at Pursusa1 |
Plinth level |
-
latitude : 22.839526666666664,22.839526666666664
Longitude : 87.41968,87.41968
file name : Image_24122021140124074.png
|
2021-12-24 14:01:24.16906 |
42 |
35266128 |
Construction Of Concrete road from Canel pole to Naderchand home at Dhanyachora |
276733 |
Construction Of Concrete road from Canel pole to Naderchand home at Dhanyachora1 |
Roof laid |
-
latitude : 22.8539934,22.8539904
Longitude : 87.4305112,87.4305142
file name : Image_05012022125255237.png
|
2022-01-05 12:52:55.346949 |
43 |
35266128 |
Construction Of Concrete road from Canel pole to Naderchand home at Dhanyachora |
276733 |
Construction Of Concrete road from Canel pole to Naderchand home at Dhanyachora1 |
Roof laid |
-
latitude : 22.8540141,22.854012,22.854012
Longitude : 87.4306165,87.4306176,87.4306176
file name : Image_31122021160442100.png
|
2021-12-31 16:04:42.23237 |
44 |
35266128 |
Construction Of Concrete road from Canel pole to Naderchand home at Dhanyachora |
276733 |
Construction Of Concrete road from Canel pole to Naderchand home at Dhanyachora1 |
Completion of work |
-
latitude : 22.8539999,22.8539999
Longitude : 87.4305055,87.4305055
file name : Image_21122021120840325.png
|
2021-12-21 12:08:40.436594 |
45 |
35266128 |
Construction Of Concrete road from Canel pole to Naderchand home at Dhanyachora |
276733 |
Construction Of Concrete road from Canel pole to Naderchand home at Dhanyachora1 |
Completion of work |
-
latitude : 22.8539749,22.8540086
Longitude : 87.4306068,87.4305732
file name : Image_20122021133533158.png
|
2021-12-20 13:35:33.286239 |
46 |
35266128 |
Construction Of Concrete road from Canel pole to Naderchand home at Dhanyachora |
276733 |
Construction Of Concrete road from Canel pole to Naderchand home at Dhanyachora1 |
Plinth level |
-
latitude : 22.8540234,22.8539578
Longitude : 87.430475,87.4306257
file name : Image_23122021154913758.png
|
2021-12-23 15:49:13.858708 |
47 |
39110997 |
Re-Excavation of Road Side Drain at Dhalma |
50000 |
Re-Excavation of Road Side Drain at Dhalma 1 |
Roof laid |
-
latitude : 22.835067962296307,22.835067166015506
Longitude : 87.44912216439843,87.44910682551563
file name : Image_03012022140237100.png
|
2022-01-03 14:02:37.192822 |
48 |
39110997 |
Re-Excavation of Road Side Drain at Dhalma |
50000 |
Re-Excavation of Road Side Drain at Dhalma 1 |
Plinth level |
-
latitude : 22.83501855097711,22.83501855097711
Longitude : 87.44912057183683,87.44912057183683
file name : Image_03012022135909717.png
|
2022-01-03 13:59:09.864235 |
49 |
39110997 |
Re-Excavation of Road Side Drain at Dhalma |
50000 |
Re-Excavation of Road Side Drain at Dhalma 1 |
Completion of work |
-
latitude : 22.831838333333334,22.831838333333334
Longitude : 87.46325833333334,87.46325833333334
file name : Image_30122021142938195.png
|
2021-12-30 14:29:38.319287 |
50 |
39110997 |
Re-Excavation of Road Side Drain at Dhalma |
50000 |
Re-Excavation of Road Side Drain at Dhalma 1 |
Completion of work |
-
latitude : 22.831838333333334,22.831838333333334
Longitude : 87.46325833333334,87.46325833333334
file name : Image_30122021142947329.png
|
2021-12-30 14:29:47.433928 |
51 |
34803779 |
Installition of pipe line from Rabi Mallick home to Bag para via atchala at Dhalma |
177865 |
Installition of pipe line from Rabi Mallick home to Bag para via atchala at Dhalma1 |
Roof laid |
-
latitude : 22.831797846592963,22.831814233213663
Longitude : 87.45010762475431,87.45012698695064
file name : Image_03012022142738645.png
|
2022-01-03 14:27:38.772596 |
52 |
34803779 |
Installition of pipe line from Rabi Mallick home to Bag para via atchala at Dhalma |
177865 |
Installition of pipe line from Rabi Mallick home to Bag para via atchala at Dhalma1 |
Roof laid |
-
latitude : 22.83179210498929,22.83179411664605
Longitude : 87.4501289986074,87.45014760643244
file name : Image_03012022141047024.png
|
2022-01-03 14:10:47.137577 |
53 |
34803779 |
Installition of pipe line from Rabi Mallick home to Bag para via atchala at Dhalma |
177865 |
Installition of pipe line from Rabi Mallick home to Bag para via atchala at Dhalma1 |
Completion of work |
-
latitude : 22.83015833333333,22.83017
Longitude : 87.45119333333332,87.45118833333332
file name : Image_20122021133537987.png
|
2021-12-20 13:35:38.104994 |
54 |
34803779 |
Installition of pipe line from Rabi Mallick home to Bag para via atchala at Dhalma |
177865 |
Installition of pipe line from Rabi Mallick home to Bag para via atchala at Dhalma1 |
Completion of work |
-
latitude : 22.83015833333333,22.83017
Longitude : 87.45119333333332,87.45118833333332
file name : Image_20122021133542462.png
|
2021-12-20 13:35:42.576402 |
55 |
34803779 |
Installition of pipe line from Rabi Mallick home to Bag para via atchala at Dhalma |
177865 |
Installition of pipe line from Rabi Mallick home to Bag para via atchala at Dhalma1 |
Plinth level |
-
latitude : 22.831871666666665,22.831875
Longitude : 87.450125,87.45012666666668
file name : Image_24122021134759741.png
|
2021-12-24 13:47:59.854919 |
56 |
36038676 |
Installation of Sub Marsibal Pump with Tank at Birajpur Muchi Danga |
229629 |
Installation of Sub Marsibal Pump with Tank at Birajpur Muchi Danga1 |
Roof laid |
-
latitude : 22.8278341
Longitude : 87.4837655
file name : Image_27012022111223848.png
|
2022-01-27 11:12:23.946379 |
57 |
36038676 |
Installation of Sub Marsibal Pump with Tank at Birajpur Muchi Danga |
229629 |
Installation of Sub Marsibal Pump with Tank at Birajpur Muchi Danga1 |
Plinth level |
-
latitude : 22.829692983068526
Longitude : 87.48491205275059
file name : Image_19012022105846373.png
|
2022-01-19 10:58:46.50265 |
58 |
36038676 |
Installation of Sub Marsibal Pump with Tank at Birajpur Muchi Danga |
229629 |
Installation of Sub Marsibal Pump with Tank at Birajpur Muchi Danga1 |
Completion of work |
-
latitude : 22.829713333333334
Longitude : 87.48491166666666
file name : Image_24122021130640047.png
|
2021-12-24 13:06:40.166009 |
59 |
39111076 |
Re-Excavation of Road Side Drain at Lodha |
50000 |
Re-Excavation of Road Side Drain at Lodha1 |
Roof laid |
-
latitude : 22.85502720158547,22.855028919875622
Longitude : 87.46077728457749,87.46077233925462
file name : Image_03012022143131891.png
|
2022-01-03 14:31:32.005378 |
60 |
39111076 |
Re-Excavation of Road Side Drain at Lodha |
50000 |
Re-Excavation of Road Side Drain at Lodha1 |
Plinth level |
-
latitude : 22.854999750852585,22.855020663700998
Longitude : 87.46078725904226,87.46080025099218
file name : Image_03012022142747257.png
|
2022-01-03 14:27:47.363454 |
61 |
39111076 |
Re-Excavation of Road Side Drain at Lodha |
50000 |
Re-Excavation of Road Side Drain at Lodha1 |
Plinth level |
-
latitude : 22.854999750852585,22.855020663700998
Longitude : 87.46078725904226,87.46080025099218
file name : Image_03012022142742125.png
|
2022-01-03 14:27:42.229849 |
62 |
39111076 |
Re-Excavation of Road Side Drain at Lodha |
50000 |
Re-Excavation of Road Side Drain at Lodha1 |
Completion of work |
-
latitude : 22.835075,22.835056666666667
Longitude : 87.44909666666666,87.44909666666666
file name : Image_24122021134219417.png
|
2021-12-24 13:42:19.52541 |
63 |
39111076 |
Re-Excavation of Road Side Drain at Lodha |
50000 |
Re-Excavation of Road Side Drain at Lodha1 |
Plinth level |
-
latitude : 22.83185,22.83185
Longitude : 87.46327000000001,87.46327000000001
file name : Image_30122021142951879.png
|
2021-12-30 14:29:51.982172 |
64 |
39111076 |
Re-Excavation of Road Side Drain at Lodha |
50000 |
Re-Excavation of Road Side Drain at Lodha1 |
Plinth level |
-
latitude : 22.83185,22.83185
Longitude : 87.46327000000001,87.46327000000001
file name : Image_30122021142941388.png
|
2021-12-30 14:29:41.510561 |
65 |
39108522 |
Re-Excavation of Road Side Drain at Ghoramara |
50000 |
Re-Excavation of Road Side Drain at Ghoramara 1 |
Roof laid |
-
latitude : 22.831796631217003,22.83179290127009
Longitude : 87.46327391825616,87.46328297071159
file name : Image_03012022133254232.png
|
2022-01-03 13:32:54.345184 |
66 |
39108522 |
Re-Excavation of Road Side Drain at Ghoramara |
50000 |
Re-Excavation of Road Side Drain at Ghoramara 1 |
Completion of work |
-
latitude : 22.83178037032485,22.831809539347887
Longitude : 87.4632895924151,87.46329395100474
file name : Image_03012022132616337.png
|
2022-01-03 13:26:16.456071 |
67 |
39108522 |
Re-Excavation of Road Side Drain at Ghoramara |
50000 |
Re-Excavation of Road Side Drain at Ghoramara 1 |
Completion of work |
-
latitude : 22.831709999999998,22.831709999999998
Longitude : 87.46326166666668,87.46326166666668
file name : Image_30122021142944290.png
|
2021-12-30 14:29:44.391404 |
68 |
39108522 |
Re-Excavation of Road Side Drain at Ghoramara |
50000 |
Re-Excavation of Road Side Drain at Ghoramara 1 |
Completion of work |
-
latitude : 22.82983166666667,22.82983166666667
Longitude : 87.47225166666666,87.472255
file name : Image_24122021132453785.png
|
2021-12-24 13:24:53.88904 |
69 |
39108522 |
Re-Excavation of Road Side Drain at Ghoramara |
50000 |
Re-Excavation of Road Side Drain at Ghoramara 1 |
Completion of work |
-
latitude : 22.831709999999998,22.831709999999998
Longitude : 87.46326166666668,87.46326166666668
file name : Image_30122021142935054.png
|
2021-12-30 14:29:35.163806 |
70 |
39106295 |
Construction Of Concrete Drain from Swapan Samanta home to Basari Land at Lodha |
290000 |
Construction Of Concrete Drain from Swapan Samanta home to Basari Land at Lodha 1 |
Completion of work |
-
latitude : 22.854973333333337,22.854966666666662
Longitude : 87.46076333333333,87.46073833333334
file name : Image_22122021134909561.png
|
2021-12-22 13:49:09.678683 |
71 |
39106295 |
Construction Of Concrete Drain from Swapan Samanta home to Basari Land at Lodha |
290000 |
Construction Of Concrete Drain from Swapan Samanta home to Basari Land at Lodha 1 |
Completion of work |
-
latitude : 22.855036666666667,22.855036666666667
Longitude : 87.46079333333334,87.46079333333334
file name : Image_30122021142931676.png
|
2021-12-30 14:29:31.787736 |
72 |
34727929 |
Installation of sub Marsibal pump with Tank near Kasinath Kotal home at Uttar Kharkusma |
229629 |
Installation of sub Marsibal pump with Tank near Kasinath Kotal home at Uttar Kharkusma1 |
Plinth level |
-
latitude : 22.8674593
Longitude : 87.4282112
file name : Image_03032022132926815.png
|
2022-03-03 13:29:26.913923 |
73 |
34727929 |
Installation of sub Marsibal pump with Tank near Kasinath Kotal home at Uttar Kharkusma |
229629 |
Installation of sub Marsibal pump with Tank near Kasinath Kotal home at Uttar Kharkusma1 |
Plinth level |
-
latitude : 22.8674526
Longitude : 87.4282036
file name : Image_03032022132626554.png
|
2022-03-03 13:26:26.665372 |
74 |
34601816 |
Construction Of Concrete road from Enath Khan home to Id Gaha at Uttar Madnahari |
329476 |
Construction Of Concrete road from Enath Khan home to Id Gaha at Uttar Madnahari1 |
Completion of work |
-
latitude : 22.86511833333333,22.86511833333333
Longitude : 87.422085,87.422085
file name : Image_04012022093017057.png
|
2022-01-04 09:30:17.164716 |
75 |
34601816 |
Construction Of Concrete road from Enath Khan home to Id Gaha at Uttar Madnahari |
329476 |
Construction Of Concrete road from Enath Khan home to Id Gaha at Uttar Madnahari1 |
Completion of work |
-
latitude : 22.865113333333337,22.865105000000003
Longitude : 87.42203333333333,87.422035
file name : Image_24122021125605884.png
|
2021-12-24 12:56:06.010648 |
76 |
34596450 |
Costruction Concrete road From Jabbari Bayen home to Tanti Nala at Monglapota |
200000 |
Costruction Concrete road From Jabbari Bayen home to Tanti Nala at Monglapota1 |
Roof laid |
-
latitude : 22.86517371,22.8651737,22.86516929,22.86516929
Longitude : 87.42052348,87.4205235,87.42052153,87.42052153
file name : Image_07022022122110216.png
|
2022-02-07 12:21:10.316804 |
77 |
34596450 |
Costruction Concrete road From Jabbari Bayen home to Tanti Nala at Monglapota |
200000 |
Costruction Concrete road From Jabbari Bayen home to Tanti Nala at Monglapota1 |
Roof laid |
-
latitude : 22.86517594,22.86517603,22.8651819,22.8651819
Longitude : 87.42053065,87.42053226,87.42053312,87.42053312
file name : Image_07022022122147821.png
|
2022-02-07 12:21:47.922616 |
78 |
34596450 |
Costruction Concrete road From Jabbari Bayen home to Tanti Nala at Monglapota |
200000 |
Costruction Concrete road From Jabbari Bayen home to Tanti Nala at Monglapota1 |
Plinth level |
-
latitude : 22.8651988,22.86520699,22.86521293
Longitude : 87.42052076,87.42051569,87.42050122
file name : Image_07022022121835642.png
|
2022-02-07 12:18:35.744819 |
79 |
34596450 |
Costruction Concrete road From Jabbari Bayen home to Tanti Nala at Monglapota |
200000 |
Costruction Concrete road From Jabbari Bayen home to Tanti Nala at Monglapota1 |
Plinth level |
-
latitude : 22.86520491,22.86520408
Longitude : 87.42051221,87.42051088
file name : Image_07022022121918446.png
|
2022-02-07 12:19:18.551444 |
80 |
34596450 |
Costruction Concrete road From Jabbari Bayen home to Tanti Nala at Monglapota |
200000 |
Costruction Concrete road From Jabbari Bayen home to Tanti Nala at Monglapota1 |
Completion of work |
-
latitude : 22.86518881,22.86519711
Longitude : 87.42053063,87.42050796
file name : Image_07022022120820299.png
|
2022-02-07 12:08:20.391729 |
81 |
34596450 |
Costruction Concrete road From Jabbari Bayen home to Tanti Nala at Monglapota |
200000 |
Costruction Concrete road From Jabbari Bayen home to Tanti Nala at Monglapota1 |
Completion of work |
-
latitude : 22.86519866,22.86519347,22.86519231,22.86518801
Longitude : 87.42051956,87.4205231,87.42052111,87.42052781
file name : Image_07022022121304263.png
|
2022-02-07 12:13:04.368198 |
82 |
35176115 |
Construction Of Concrete road from PLC to Abubakkar House at Solatutbar |
328816 |
Construction Of Concrete road from PLC to Abubakkar House at Solatutbar1 |
Completion of work |
-
latitude : 22.863496666666666,22.863496666666666
Longitude : 87.42722499999999,87.42722499999999
file name : Image_05012022121451935.png
|
2022-01-05 12:14:52.025847 |
83 |
35176115 |
Construction Of Concrete road from PLC to Abubakkar House at Solatutbar |
328816 |
Construction Of Concrete road from PLC to Abubakkar House at Solatutbar1 |
Completion of work |
-
latitude : 22.863551666666662,22.863554999999998
Longitude : 87.42735166666668,87.42733833333332
file name : Image_24122021125609137.png
|
2021-12-24 12:56:09.286695 |
84 |
35176115 |
Construction Of Concrete road from PLC to Abubakkar House at Solatutbar |
328816 |
Construction Of Concrete road from PLC to Abubakkar House at Solatutbar1 |
Completion of work |
-
latitude : 22.863551666666662,22.863554999999998
Longitude : 87.42735166666668,87.42733833333332
file name : Image_24122021125612861.png
|
2021-12-24 12:56:12.990152 |
85 |
34810214 |
Construction Of Concrete Road from Basari Panja home to Trelochan Samanta Home at Ghoramara |
336030 |
Construction Of Concrete Road from Basari Panja home to Trelochan Samanta Home at Ghoramara1 |
Roof laid |
-
latitude : 22.832030821591616,22.83199788071215
Longitude : 87.46120484545827,87.46123384684324
file name : Image_07022022155356316.png
|
2022-02-07 15:53:56.4122 |
86 |
34810214 |
Construction Of Concrete Road from Basari Panja home to Trelochan Samanta Home at Ghoramara |
336030 |
Construction Of Concrete Road from Basari Panja home to Trelochan Samanta Home at Ghoramara1 |
Plinth level |
-
latitude : 22.8539927,22.8539927,22.84713737,22.84713737
Longitude : 87.4306064,87.4306064,87.44983909,87.44983909
file name : Image_24012022175157369.png
|
2022-01-24 17:51:57.468896 |
87 |
34810214 |
Construction Of Concrete Road from Basari Panja home to Trelochan Samanta Home at Ghoramara |
336030 |
Construction Of Concrete Road from Basari Panja home to Trelochan Samanta Home at Ghoramara1 |
Plinth level |
-
latitude : 22.83200237,22.83200237
Longitude : 87.46132139,87.46132139
file name : Image_24012022175200732.png
|
2022-01-24 17:52:00.835261 |
88 |
34810214 |
Construction Of Concrete Road from Basari Panja home to Trelochan Samanta Home at Ghoramara |
336030 |
Construction Of Concrete Road from Basari Panja home to Trelochan Samanta Home at Ghoramara1 |
Completion of work |
-
latitude : 22.83210166666667,22.832098333333338
Longitude : 87.46121999999998,87.46122166666667
file name : Image_24122021133658975.png
|
2021-12-24 13:36:59.094227 |
89 |
39106231 |
Construction Of Concrete Drain from Panchayat office to Esra dalal House at Dhanyachora |
254231 |
Construction Of Concrete Drain from Panchayat office to Esra dalal House at Dhanyachora 1 |
Plinth level |
-
latitude : 22.85689582116902,22.85689582116902
Longitude : 87.43050696328282,87.43050696328282
file name : Image_15022021162836469.png
|
2021-02-15 16:28:36.544391 |
90 |
39106231 |
Construction Of Concrete Drain from Panchayat office to Esra dalal House at Dhanyachora |
254231 |
Construction Of Concrete Drain from Panchayat office to Esra dalal House at Dhanyachora 1 |
Completion of work |
-
latitude : 22.856868370436132,22.856868370436132
Longitude : 87.43051802739501,87.43051802739501
file name : Image_11022021115534020.png
|
2021-02-11 11:55:34.118488 |
91 |
34811426 |
Construction Of Concrete road from Alihusen Home to upar Basti at Taldanga |
263413 |
Construction Of Concrete road from Alihusen Home to upar Basti at Taldanga1 |
Plinth level |
-
latitude : 22.857316466979682,22.857316466979682
Longitude : 87.4339494947344,87.4339494947344
file name : Image_15022021163206374.png
|
2021-02-15 16:32:06.459035 |
92 |
34811426 |
Construction Of Concrete road from Alihusen Home to upar Basti at Taldanga |
263413 |
Construction Of Concrete road from Alihusen Home to upar Basti at Taldanga1 |
Completion of work |
-
latitude : 22.85731579642743,22.857342325150967,22.857342325150967
Longitude : 87.43390750139952,87.43391387164593,87.43391387164593
file name : Image_11022021114310710.png
|
2021-02-11 11:43:10.812751 |
93 |
34593581 |
Construction Of Concrete road from Ashok jan home to Barun Jana home at Birajpur |
270971 |
Construction Of Concrete road from Ashok jan home to Barun Jana home at Birajpur1 |
Plinth level |
-
latitude : 22.83705895766616,22.837058622390032
Longitude : 87.48114053159952,87.48114296235144
file name : Image_15022021121716995.png
|
2021-02-15 12:17:17.090838 |
94 |
34593581 |
Construction Of Concrete road from Ashok jan home to Barun Jana home at Birajpur |
270971 |
Construction Of Concrete road from Ashok jan home to Barun Jana home at Birajpur1 |
Completion of work |
-
latitude : 22.837101873010397,22.837101873010397
Longitude : 87.48104581609368,87.48104581609368
file name : Image_11022021130335253.png
|
2021-02-11 13:03:35.360973 |
95 |
34806954 |
Construction Of Concrete road from Mathuri Indgha to Mathuri Masjid at Mathuri |
263757 |
Construction Of Concrete road from Mathuri Indgha to Mathuri Masjid at Mathuri1 |
Plinth level |
-
latitude : 22.862001825124025,22.862001825124025
Longitude : 87.4330590851605,87.4330590851605
file name : Image_16022021102638740.png
|
2021-02-16 10:26:38.818101 |
96 |
34806954 |
Construction Of Concrete road from Mathuri Indgha to Mathuri Masjid at Mathuri |
263757 |
Construction Of Concrete road from Mathuri Indgha to Mathuri Masjid at Mathuri1 |
Completion of work |
-
latitude : 22.86196565721184,22.86196565721184
Longitude : 87.43300552479923,87.43300552479923
file name : Image_11022021115200977.png
|
2021-02-11 11:52:01.076105 |
97 |
46761594 |
Construction of concret road from Saker Khan house to Altak khan house at Solatutbar |
300000 |
Construction of concret road from Saker Khan house to Altak khan house at Solatutbar1 |
Plinth level |
-
latitude : 22.86376235,22.86376235
Longitude : 87.42759356,87.42759356
file name : Image_21032023151845734.png
|
2023-03-21 15:18:45.810919 |
98 |
46761594 |
Construction of concret road from Saker Khan house to Altak khan house at Solatutbar |
300000 |
Construction of concret road from Saker Khan house to Altak khan house at Solatutbar1 |
Roof laid |
-
latitude : 22.86383257,22.86383258
Longitude : 87.42756926,87.42756924
file name : Image_21032023152549544.png
|
2023-03-21 15:25:49.618559 |
99 |
46761594 |
Construction of concret road from Saker Khan house to Altak khan house at Solatutbar |
300000 |
Construction of concret road from Saker Khan house to Altak khan house at Solatutbar1 |
Completion of work |
-
latitude : 22.86380295,22.86380295
Longitude : 87.42753595,87.42753595
file name : Image_10032023154829676.png
|
2023-03-10 15:48:29.781591 |
100 |
46761416 |
Construction of concret road from S.S.K to Mammhad Dalal house at Taldanga |
201645 |
Construction of concret road from S.S.K to Mammhad Dalal house at Taldanga1 |
Plinth level |
-
latitude : 22.86064232,22.86064232
Longitude : 87.43151297,87.43151297
file name : Image_21032023153348017.png
|
2023-03-21 15:33:48.104638 |
101 |
46761416 |
Construction of concret road from S.S.K to Mammhad Dalal house at Taldanga |
201645 |
Construction of concret road from S.S.K to Mammhad Dalal house at Taldanga1 |
Roof laid |
-
latitude : 22.86015634,22.86015634
Longitude : 87.43124507,87.43124507
file name : Image_21032023153753097.png
|
2023-03-21 15:37:53.201471 |
102 |
46761416 |
Construction of concret road from S.S.K to Mammhad Dalal house at Taldanga |
201645 |
Construction of concret road from S.S.K to Mammhad Dalal house at Taldanga1 |
Completion of work |
-
latitude : 22.86043856,22.86043856
Longitude : 87.43131027,87.43131027
file name : Image_15032023124749568.png
|
2023-03-15 12:47:49.698471 |
103 |
46761272 |
Instlation of submersible pump with pipeline near Mamataj Kha house at Taldanga |
144357 |
Instlation of submersible pump with pipeline near Mamataj Kha house at Taldanga1 |
Roof laid |
-
latitude : 22.85743345
Longitude : 87.42961929
file name : Image_21032023154045877.png
|
2023-03-21 15:40:45.976874 |
104 |
46761272 |
Instlation of submersible pump with pipeline near Mamataj Kha house at Taldanga |
144357 |
Instlation of submersible pump with pipeline near Mamataj Kha house at Taldanga1 |
Completion of work |
-
latitude : 22.86064768
Longitude : 87.43163534
file name : Image_15032023125357811.png
|
2023-03-15 12:53:57.908679 |
105 |
46761272 |
Instlation of submersible pump with pipeline near Mamataj Kha house at Taldanga |
144357 |
Instlation of submersible pump with pipeline near Mamataj Kha house at Taldanga1 |
Plinth level |
-
latitude : 22.85739112
Longitude : 87.42965583
file name : Image_16032023134635913.png
|
2023-03-16 13:46:36.014368 |
106 |
66830404 |
Water Supply to villages |
156000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.86674035
Longitude : 87.42739544
file name : Image_10042023081153686.png
|
2023-04-10 08:11:53.784837 |
107 |
66830404 |
Water Supply to villages |
156000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.86674856
Longitude : 87.42738258
file name : Image_10042023081341931.png
|
2023-04-10 08:13:42.021018 |
108 |
66830404 |
Water Supply to villages |
156000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.86681873
Longitude : 87.4273914
file name : Image_10032023154412914.png
|
2023-03-10 15:44:13.007554 |
109 |
67094626 |
Water Supply to villages |
169475 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.8498589
Longitude : 87.4645763
file name : Image_20042023140003244.png
|
2023-04-20 14:00:03.355349 |
110 |
67094626 |
Water Supply to villages |
169475 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.850236
Longitude : 87.4648858
file name : Image_02042023151207989.png
|
2023-04-02 15:12:08.088099 |
111 |
67094626 |
Water Supply to villages |
169475 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.84959414
Longitude : 87.46477317
file name : Image_02042023151508987.png
|
2023-04-02 15:15:09.100161 |
112 |
67094804 |
Water Supply to villages |
30000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.86637884
Longitude : 87.42567608
file name : Image_02052023161308323.png
|
2023-05-02 16:13:08.429805 |
113 |
67094804 |
Water Supply to villages |
30000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.86638342
Longitude : 87.42565668
file name : Image_02052023161527100.png
|
2023-05-02 16:15:27.208297 |
114 |
67094804 |
Water Supply to villages |
30000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.86637561
Longitude : 87.42566051
file name : Image_02052023161654358.png
|
2023-05-02 16:16:54.461628 |
115 |
67094735 |
Water Supply to villages |
30000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.86637891
Longitude : 87.42566579
file name : Image_02052023162115614.png
|
2023-05-02 16:21:15.71523 |
116 |
67094735 |
Water Supply to villages |
30000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.86639039
Longitude : 87.4256815
file name : Image_02052023162246702.png
|
2023-05-02 16:22:46.806163 |
117 |
67094735 |
Water Supply to villages |
30000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.86636427
Longitude : 87.42566362
file name : Image_02052023162349806.png
|
2023-05-02 16:23:49.915506 |
118 |
49026651 |
Saifulla Khan house to bara masjid Drain Daskin Paschim Kharkusma |
160486 |
Saifulla Khan house to bara masjid Drain Daskin Paschim Kharkusma1 |
Completion of work |
-
latitude : 22.86607821
Longitude : 87.42577266
file name : Image_20052023113048406.png
|
2023-05-20 11:30:48.505667 |
119 |
49026651 |
Saifulla Khan house to bara masjid Drain Daskin Paschim Kharkusma |
160486 |
Saifulla Khan house to bara masjid Drain Daskin Paschim Kharkusma1 |
Plinth level |
-
latitude : 22.86606748
Longitude : 87.42575331
file name : Image_20052023113357290.png
|
2023-05-20 11:33:57.392599 |
120 |
49026651 |
Saifulla Khan house to bara masjid Drain Daskin Paschim Kharkusma |
160486 |
Saifulla Khan house to bara masjid Drain Daskin Paschim Kharkusma1 |
Plinth level |
-
latitude : 22.86610639
Longitude : 87.42581426
file name : Image_20052023113550646.png
|
2023-05-20 11:35:50.757493 |
121 |
49026651 |
Saifulla Khan house to bara masjid Drain Daskin Paschim Kharkusma |
160486 |
Saifulla Khan house to bara masjid Drain Daskin Paschim Kharkusma1 |
Roof laid |
-
latitude : 22.86617231
Longitude : 87.42582169
file name : Image_20052023114118040.png
|
2023-05-20 11:41:18.154799 |
122 |
39089141 |
Installation of Sub Marsibal Pump with Tank near Ghoramara at Ghoramara |
260162 |
Installation of Sub Marsibal Pump with Tank near Ghoramara at Ghoramara1 |
Plinth level |
-
latitude : 22.86515325307846
Longitude : 87.42583497427404
file name : Image_04032021120458299.png
|
2021-03-04 12:04:58.393064 |
123 |
39089141 |
Installation of Sub Marsibal Pump with Tank near Ghoramara at Ghoramara |
260162 |
Installation of Sub Marsibal Pump with Tank near Ghoramara at Ghoramara1 |
Completion of work |
-
latitude : 22.83005910459906
Longitude : 87.47113798744977
file name : Image_15022021123423055.png
|
2021-02-15 12:34:23.174718 |
124 |
39104054 |
Installalation of sup- pump with tank at Solatutbar ICDS |
259133 |
Installalation of sup- pump with tank at Solatutbar ICDS1 |
Completion of work |
-
latitude : 22.864477294497192
Longitude : 87.4279285222292
file name : Image_15022021103617299.png
|
2021-02-15 10:36:17.403681 |
125 |
46764584 |
Office computer & Xerox repair |
250000 |
Office computer & Xerox repair 1 |
Roof laid |
-
latitude : 22.8539619
Longitude : 87.4305468
file name : Image_25052023140307516.png
|
2023-05-25 14:03:07.60206 |
126 |
46764584 |
Office computer & Xerox repair |
250000 |
Office computer & Xerox repair 1 |
Roof laid |
-
latitude : 22.853996
Longitude : 87.4305826
file name : Image_30062022182945039.png
|
2022-06-30 18:29:45.136175 |
127 |
46764584 |
Office computer & Xerox repair |
250000 |
Office computer & Xerox repair 1 |
Roof laid |
-
latitude : 22.8539757
Longitude : 87.4305722
file name : Image_03082021150449070.png
|
2021-08-03 15:04:49.158525 |
128 |
46764584 |
Office computer & Xerox repair |
250000 |
Office computer & Xerox repair 1 |
Completion of work |
-
latitude : 22.8539784
Longitude : 87.4305773
file name : Image_03082021145502228.png
|
2021-08-03 14:55:02.328475 |
129 |
39106361 |
Costruction Concrete Drain From High Madrasa to Deluar Khan Home At Uttar Madnahari |
263662 |
Costruction Concrete Drain From High Madrasa to Deluar Khan Home At Uttar Madnahari 1 |
Completion of work |
-
latitude : 22.865143194794655,22.865143194794655
Longitude : 87.4240102339536,87.4240102339536
file name : Image_15022021165248949.png
|
2021-02-15 16:52:49.038253 |
130 |
46752465 |
Construction of concret drain Bhurabi than to Banpukur Pursusa |
241718 |
Construction of concret drain Bhurabi than to Banpukur Pursusa1 |
Roof laid |
-
latitude : 22.83366137
Longitude : 87.42022786
file name : Image_06122022115409927.png
|
2022-12-06 11:54:10.040287 |
131 |
46752465 |
Construction of concret drain Bhurabi than to Banpukur Pursusa |
241718 |
Construction of concret drain Bhurabi than to Banpukur Pursusa1 |
Plinth level |
-
latitude : 22.83363233
Longitude : 87.42025333
file name : Image_29112022153445064.png
|
2022-11-29 15:34:45.17817 |
132 |
46752465 |
Construction of concret drain Bhurabi than to Banpukur Pursusa |
241718 |
Construction of concret drain Bhurabi than to Banpukur Pursusa1 |
Completion of work |
-
latitude : 22.8335882
Longitude : 87.42023445
file name : Image_21112022135159502.png
|
2022-11-21 13:02:07.25948 |
133 |
46749039 |
Construction of concret drain from Kabir house to pitch road at Dhannyachora |
160486 |
Construction of concret drain from Kabir house to pitch road at Dhannyachora1 |
Completion of work |
-
latitude : 22.8535339
Longitude : 87.4287517
file name : Image_10032023163859641.png
|
2023-03-10 16:38:59.74068 |
134 |
46749039 |
Construction of concret drain from Kabir house to pitch road at Dhannyachora |
160486 |
Construction of concret drain from Kabir house to pitch road at Dhannyachora1 |
Plinth level |
-
latitude : 22.8535767
Longitude : 87.4287383
file name : Image_10032023164147145.png
|
2023-03-10 16:41:47.236873 |
135 |
46749039 |
Construction of concret drain from Kabir house to pitch road at Dhannyachora |
160486 |
Construction of concret drain from Kabir house to pitch road at Dhannyachora1 |
Roof laid |
-
latitude : 22.8535402
Longitude : 87.4287501
file name : Image_10032023164434629.png
|
2023-03-10 16:44:34.721421 |
136 |
59977162 |
Construction Of Concrete Drain from Najrul Haque Land to Khal at Solatutbar |
300000 |
Construction Of Concrete Drain from Najrul Haque Land to Khal at Solatutbar1 |
Roof laid |
-
latitude : 22.86399964,22.86399964
Longitude : 87.42841594,87.42841594
file name : Image_07062023174725503.png
|
2023-06-07 17:47:25.592908 |
137 |
59977162 |
Construction Of Concrete Drain from Najrul Haque Land to Khal at Solatutbar |
300000 |
Construction Of Concrete Drain from Najrul Haque Land to Khal at Solatutbar1 |
Completion of work |
-
latitude : 22.86403568,22.86403864
Longitude : 87.4283828,87.42838147
file name : Image_31052023182300970.png
|
2023-05-31 18:23:01.064565 |
138 |
59977162 |
Construction Of Concrete Drain from Najrul Haque Land to Khal at Solatutbar |
300000 |
Construction Of Concrete Drain from Najrul Haque Land to Khal at Solatutbar1 |
Plinth level |
-
latitude : 22.86405621,22.86405621
Longitude : 87.42835999,87.42835999
file name : Image_31052023182615572.png
|
2023-05-31 18:26:15.655339 |
139 |
59942524 |
Grampanchayet office building repair & Coiour |
323520 |
Grampanchayet office building repair & Coiour1 |
Completion of work |
-
latitude : 22.8539793
Longitude : 87.4305246
file name : Image_09062023144313518.png
|
2023-06-09 14:43:13.59058 |
140 |
59942524 |
Grampanchayet office building repair & Coiour |
323520 |
Grampanchayet office building repair & Coiour1 |
Plinth level |
-
latitude : 22.8539798
Longitude : 87.430523
file name : Image_09062023144607274.png
|
2023-06-09 14:46:07.358574 |
141 |
59942524 |
Grampanchayet office building repair & Coiour |
323520 |
Grampanchayet office building repair & Coiour1 |
Roof laid |
-
latitude : 22.853978
Longitude : 87.4305217
file name : Image_09062023150051992.png
|
2023-06-09 15:00:52.086844 |
142 |
67080937 |
Deduction Expenditure for 2020-21 fy Scheme |
367054 |
Deduction Expenditure for 2020-21 fy Scheme1 |
Plinth level |
-
latitude : 22.8539761,22.8539761
Longitude : 87.4305628,87.4305628
file name : Image_03032023210346827.png
|
2023-03-03 21:03:46.918429 |
143 |
67080281 |
Operation & maintenance of community sanitary complex |
673341 |
Operation & maintenance of community sanitary complex1 |
Plinth level |
-
latitude : 22.8539783
Longitude : 87.4305636
file name : Image_03032023210238153.png
|
2023-03-03 21:02:38.258625 |
144 |
67080307 |
Operation & maintenance of drinking water supply system |
238849 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 22.8539766
Longitude : 87.4305628
file name : Image_03032023210316177.png
|
2023-03-03 21:03:16.264704 |
145 |
67647806 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.8640823,22.8640823
Longitude : 87.42754581,87.42754581
file name : Image_29122023134833611.png
|
2023-12-29 13:48:33.714691 |
146 |
67647806 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.86404194,22.86404194
Longitude : 87.42757222,87.42757222
file name : Image_29122023134540338.png
|
2023-12-29 13:45:40.429332 |
147 |
67647806 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.86400104,22.86400104
Longitude : 87.42764287,87.42764287
file name : Image_29122023134235103.png
|
2023-12-29 13:42:35.19816 |
148 |
67639808 |
Boundary wall and Gate |
250000 |
Boundary wall and Gate1 |
Plinth level |
-
latitude : 22.8540225
Longitude : 87.4305582
file name : Image_30122023172918050.png
|
2023-12-30 17:29:18.124643 |
149 |
67639808 |
Boundary wall and Gate |
250000 |
Boundary wall and Gate1 |
Completion of work |
-
latitude : 22.8540319
Longitude : 87.4305515
file name : Image_30122023172703405.png
|
2023-12-30 17:27:03.487013 |
150 |
67646662 |
Procurement of Printer |
130000 |
Procurement of Printer |
|
-
latitude : 22.8539797
Longitude : 87.4305649
file name : Image_14092023164918472.png
|
2023-09-14 16:49:18.579218 |
151 |
67646662 |
Procurement of Printer |
130000 |
Procurement of Printer |
|
-
latitude : 22.8539772
Longitude : 87.4305641
file name : Image_14092023164946643.png
|
2023-09-14 16:49:46.831096 |
152 |
67646662 |
Procurement of Printer |
130000 |
Procurement of Printer |
|
-
latitude : 22.8539816
Longitude : 87.4305619
file name : Image_14092023165010674.png
|
2023-09-14 16:50:10.846105 |
153 |
67646662 |
Procurement of Printer |
130000 |
Procurement of Printer |
|
-
latitude : 22.8539781
Longitude : 87.4305609
file name : Image_14092023165036181.png
|
2023-09-14 16:50:36.332888 |
154 |
67646662 |
Procurement of Printer |
130000 |
Procurement of Printer |
|
-
latitude : 22.8539753
Longitude : 87.4305624
file name : Image_04102023140554122.png
|
2023-10-04 14:05:54.214744 |
155 |
67580821 |
Construction and repairing of Gate doors window, fixtures etc. |
150000 |
Construction and repairing of Gate doors window, fixtures etc.1 |
Roof laid |
-
latitude : 22.86615249
Longitude : 87.42908866
file name : Image_30122023171140276.png
|
2023-12-30 17:11:40.355655 |
156 |
67580821 |
Construction and repairing of Gate doors window, fixtures etc. |
150000 |
Construction and repairing of Gate doors window, fixtures etc.1 |
Plinth level |
-
latitude : 22.86617711
Longitude : 87.4291231
file name : Image_30122023170904818.png
|
2023-12-30 17:09:04.897374 |
157 |
67580821 |
Construction and repairing of Gate doors window, fixtures etc. |
150000 |
Construction and repairing of Gate doors window, fixtures etc.1 |
Completion of work |
-
latitude : 22.86615376
Longitude : 87.42910501
file name : Image_30122023170502410.png
|
2023-12-30 17:05:02.512672 |
158 |
67649748 |
Installation of Computer with Internet facility |
60000 |
Installation of Computer with Internet facility1 |
|
-
latitude : 22.8539782
Longitude : 87.4305696
file name : Image_09102023170259201.png
|
2023-10-09 17:02:59.281947 |
159 |
67094597 |
Water Supply to villages |
39721 |
Water Supply to villages1 |
|
-
latitude : 22.84543663
Longitude : 87.42070707
file name : Image_04102023140908819.png
|
2023-10-04 14:09:08.913286 |
160 |
67094597 |
Water Supply to villages |
39721 |
Water Supply to villages1 |
|
-
latitude : 22.84539385
Longitude : 87.42075547
file name : Image_04102023140652420.png
|
2023-10-04 14:06:52.523165 |
161 |
67094597 |
Water Supply to villages |
39721 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.8539797
Longitude : 87.430545
file name : Image_26072023151311804.png
|
2023-07-26 15:13:11.918249 |
162 |
59978118 |
Costruction Concrete Drain From Manglapota Mandir Drain Meramat at Monglapota |
66123 |
Costruction Concrete Drain From Manglapota Mandir Drain Meramat at Monglapota1 |
Plinth level |
-
latitude : 22.86874585,22.86876903
Longitude : 87.42055995,87.42049615
file name : Image_09102023155527444.png
|
2023-10-09 15:55:27.547757 |
163 |
59978118 |
Costruction Concrete Drain From Manglapota Mandir Drain Meramat at Monglapota |
66123 |
Costruction Concrete Drain From Manglapota Mandir Drain Meramat at Monglapota1 |
Completion of work |
-
latitude : 22.86909116,22.86909116
Longitude : 87.41963627,87.41963627
file name : Image_04102023142705432.png
|
2023-10-04 14:27:05.533959 |
164 |
67464219 |
Drainage Construction |
175335 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.86071527
Longitude : 87.42404564
file name : Image_03012024155005862.png
|
2024-01-03 15:50:05.939104 |
165 |
67464219 |
Drainage Construction |
175335 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.86079651
Longitude : 87.42417146
file name : Image_03012024154640085.png
|
2024-01-03 15:46:40.164847 |
166 |
67464219 |
Drainage Construction |
175335 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.8608664
Longitude : 87.42428293
file name : Image_03012024154351333.png
|
2024-01-03 15:43:51.412064 |
167 |
67580062 |
Functional Electricity Connection |
100000 |
Functional Electricity Connection1 |
Roof laid |
-
latitude : 22.85674739
Longitude : 87.45739079
file name : Image_15012024103252858.png
|
2024-01-15 10:32:52.973104 |
168 |
67580062 |
Functional Electricity Connection |
100000 |
Functional Electricity Connection1 |
Plinth level |
-
latitude : 22.85685607
Longitude : 87.45731671
file name : Image_15012024103043638.png
|
2024-01-15 10:30:43.731404 |
169 |
67580062 |
Functional Electricity Connection |
100000 |
Functional Electricity Connection1 |
Completion of work |
-
latitude : 22.85502398
Longitude : 87.42980234
file name : Image_15012024102725095.png
|
2024-01-15 10:27:25.192116 |
170 |
67576943 |
Pipeline connection for water supply to all houses |
250000 |
Pipeline connection for water supply to all houses1 |
|
-
latitude : 22.84342252
Longitude : 87.417713
file name : Image_11012024145906857.png
|
2024-01-11 14:59:06.946996 |
171 |
67575743 |
Drinking water facility |
250000 |
Drinking water facility1 |
Roof laid |
-
latitude : 22.84998137
Longitude : 87.42242026
file name : Image_11012024152143345.png
|
2024-01-11 15:21:43.436942 |
172 |
67575743 |
Drinking water facility |
250000 |
Drinking water facility1 |
Plinth level |
-
latitude : 22.84996169
Longitude : 87.42245149
file name : Image_11012024151908840.png
|
2024-01-11 15:19:08.93519 |
173 |
67575743 |
Drinking water facility |
250000 |
Drinking water facility1 |
Completion of work |
-
latitude : 22.84999611
Longitude : 87.42244487
file name : Image_11012024151355986.png
|
2024-01-11 15:13:56.076371 |
174 |
67649941 |
Procurement of Furniture |
100000 |
Procurement of Furniture1 |
Plinth level |
-
latitude : 22.85402155
Longitude : 87.43061741
file name : Image_29112023162507506.png
|
2023-11-29 16:25:07.593141 |
175 |
67649941 |
Procurement of Furniture |
100000 |
Procurement of Furniture1 |
Completion of work |
-
latitude : 22.8540129
Longitude : 87.4305457
file name : Image_29112023162323600.png
|
2023-11-29 16:23:23.69842 |
176 |
67623691 |
Purchase of Sanitary Pad Dispenser |
150000 |
Purchase of Sanitary Pad Dispenser1 |
Roof laid |
-
latitude : 22.84986442
Longitude : 87.46682642
file name : Image_19122023131238320.png
|
2023-12-19 13:12:38.40911 |
177 |
67623691 |
Purchase of Sanitary Pad Dispenser |
150000 |
Purchase of Sanitary Pad Dispenser1 |
Plinth level |
-
latitude : 22.85018982
Longitude : 87.46680957
file name : Image_19122023130221120.png
|
2023-12-19 13:02:21.214457 |
178 |
67623691 |
Purchase of Sanitary Pad Dispenser |
150000 |
Purchase of Sanitary Pad Dispenser1 |
Completion of work |
-
latitude : 22.85013053
Longitude : 87.46683844
file name : Image_19122023124334171.png
|
2023-12-19 12:43:34.020379 |
179 |
67623164 |
Purchase of Sanitary Pad Dispenser |
150000 |
Purchase of Sanitary Pad Dispenser1 |
Roof laid |
-
latitude : 22.854004
Longitude : 87.430547
file name : Image_15122023131110689.png
|
2023-12-15 13:11:10.785093 |
180 |
67623164 |
Purchase of Sanitary Pad Dispenser |
150000 |
Purchase of Sanitary Pad Dispenser1 |
Plinth level |
-
latitude : 22.8540039
Longitude : 87.4305462
file name : Image_15122023130918015.png
|
2023-12-15 13:09:17.911023 |
181 |
67623164 |
Purchase of Sanitary Pad Dispenser |
150000 |
Purchase of Sanitary Pad Dispenser1 |
Completion of work |
-
latitude : 22.8540069
Longitude : 87.4305435
file name : Image_15122023130643302.png
|
2023-12-15 13:06:43.077306 |
182 |
67623549 |
Purchase of Sanitary Pad Dispenser |
150000 |
Purchase of Sanitary Pad Dispenser1 |
Plinth level |
-
latitude : 22.8666546
Longitude : 87.42453932
file name : Image_20122023120010979.png
|
2023-12-20 12:00:11.06797 |
183 |
67623549 |
Purchase of Sanitary Pad Dispenser |
150000 |
Purchase of Sanitary Pad Dispenser1 |
Completion of work |
-
latitude : 22.8666686
Longitude : 87.4242653
file name : Image_20122023115437523.png
|
2023-12-20 11:54:37.600786 |
184 |
67581097 |
Electricity |
100000 |
Electricity1 |
|
-
latitude : 22.86605413
Longitude : 87.42681349
file name : Image_24112023151423163.png
|
2023-11-24 15:14:23.278732 |
185 |
67581097 |
Electricity |
100000 |
Electricity1 |
|
-
latitude : 22.86582985
Longitude : 87.42678187
file name : Image_24112023150754075.png
|
2023-11-24 15:07:54.1661 |
186 |
67648516 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Roof laid |
-
latitude : 22.86756941
Longitude : 87.42985952
file name : Image_24112023152700966.png
|
2023-11-24 15:27:01.072939 |
187 |
67648516 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Plinth level |
-
latitude : 22.867617
Longitude : 87.4297598
file name : Image_24112023152402189.png
|
2023-11-24 15:24:02.284693 |
188 |
67648516 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Completion of work |
-
latitude : 22.8676172
Longitude : 87.4297574
file name : Image_24112023152132320.png
|
2023-11-24 15:21:32.405891 |
189 |
67882220 |
Drainage Construction |
100000 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.85948141
Longitude : 87.43379016
file name : Image_24112023135506991.png
|
2023-11-24 13:55:07.081595 |
190 |
67882220 |
Drainage Construction |
100000 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.85944777
Longitude : 87.43381326
file name : Image_24112023135242162.png
|
2023-11-24 13:52:42.265218 |
191 |
67882220 |
Drainage Construction |
100000 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.85944465
Longitude : 87.43370279
file name : Image_24112023134846078.png
|
2023-11-24 13:48:46.165452 |
192 |
67878142 |
Drainage Construction |
69650 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.86744415
Longitude : 87.41879349
file name : Image_24112023145933442.png
|
2023-11-24 14:59:33.557461 |
193 |
67878142 |
Drainage Construction |
69650 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.86743901
Longitude : 87.41882258
file name : Image_24112023145624865.png
|
2023-11-24 14:56:24.95839 |
194 |
67878142 |
Drainage Construction |
69650 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.86744333
Longitude : 87.41876042
file name : Image_24112023145419078.png
|
2023-11-24 14:54:19.17037 |
195 |
46751787 |
Repair of submersible pump at Pursusa |
50000 |
Repair of submersible pump at Pursusa1 |
Roof laid |
-
latitude : 22.8539917
Longitude : 87.4305734
file name : Image_23112023182729840.png
|
2023-11-23 18:27:29.919691 |
196 |
46751787 |
Repair of submersible pump at Pursusa |
50000 |
Repair of submersible pump at Pursusa1 |
Plinth level |
-
latitude : 22.8539853
Longitude : 87.4305759
file name : Image_23112023182522226.png
|
2023-11-23 18:25:22.307853 |
197 |
46751787 |
Repair of submersible pump at Pursusa |
50000 |
Repair of submersible pump at Pursusa1 |
Completion of work |
-
latitude : 22.8539968
Longitude : 87.4305674
file name : Image_23112023182052395.png
|
2023-11-23 18:20:52.469946 |
198 |
34707218 |
Construction Of Concrete road from Banamali Mana home to Beltala at Baladghata |
263756 |
Construction Of Concrete road from Banamali Mana home to Beltala at Baladghata1 |
Plinth level |
-
latitude : 22.851363555528224,22.851363555528224
Longitude : 87.4778384808451,87.4778384808451
file name : Image_15022021121215498.png
|
2021-02-15 12:12:15.585059 |
199 |
34707218 |
Construction Of Concrete road from Banamali Mana home to Beltala at Baladghata |
263756 |
Construction Of Concrete road from Banamali Mana home to Beltala at Baladghata1 |
Completion of work |
-
latitude : 22.8513656090945,22.851368878036737
Longitude : 87.47781978920102,87.4778228905052
file name : Image_11022021151445020.png
|
2021-02-11 15:14:45.12329 |
200 |
34802929 |
Construction Of Concrete road fromShankar Hemram home to Bijay Hemram Home at Dhalma |
262453 |
Construction Of Concrete road fromShankar Hemram home to Bijay Hemram Home at Dhalma1 |
Plinth level |
-
latitude : 22.834991477429867,22.834991477429867
Longitude : 87.44177400134504,87.44177400134504
file name : Image_04032021121524903.png
|
2021-03-04 12:15:24.988542 |
201 |
34802929 |
Construction Of Concrete road fromShankar Hemram home to Bijay Hemram Home at Dhalma |
262453 |
Construction Of Concrete road fromShankar Hemram home to Bijay Hemram Home at Dhalma1 |
Plinth level |
-
latitude : 22.835030872374773,22.835030872374773
Longitude : 87.4417704809457,87.4417704809457
file name : Image_15022021123508052.png
|
2021-02-15 12:35:08.149921 |
202 |
34802929 |
Construction Of Concrete road fromShankar Hemram home to Bijay Hemram Home at Dhalma |
262453 |
Construction Of Concrete road fromShankar Hemram home to Bijay Hemram Home at Dhalma1 |
Plinth level |
-
latitude : 22.835030872374773,22.835030872374773
Longitude : 87.4417704809457,87.4417704809457
file name : Image_15022021123438858.png
|
2021-02-15 12:34:38.958487 |
203 |
34802929 |
Construction Of Concrete road fromShankar Hemram home to Bijay Hemram Home at Dhalma |
262453 |
Construction Of Concrete road fromShankar Hemram home to Bijay Hemram Home at Dhalma1 |
Completion of work |
-
latitude : 22.834978024475276,22.834978024475276
Longitude : 87.4417480174452,87.4417480174452
file name : Image_11022021131853187.png
|
2021-02-11 13:18:53.281405 |
204 |
34598333 |
Construction Of Concrete road from Mohan Patar home to Ramesh Patar home at Monglapota |
145119 |
Construction Of Concrete road from Mohan Patar home to Ramesh Patar home at Monglapota1 |
Plinth level |
-
latitude : 22.865195000000003,22.865195000000003
Longitude : 87.42055833333333,87.42055833333333
file name : Image_05022022090934134.png
|
2022-02-05 09:09:34.259622 |
205 |
34598333 |
Construction Of Concrete road from Mohan Patar home to Ramesh Patar home at Monglapota |
145119 |
Construction Of Concrete road from Mohan Patar home to Ramesh Patar home at Monglapota1 |
Plinth level |
-
latitude : 22.869023333333335,22.869025000000004
Longitude : 87.41970333333332,87.41970333333332
file name : Image_24062021133257329.png
|
2021-06-24 13:32:57.456755 |
206 |
34598333 |
Construction Of Concrete road from Mohan Patar home to Ramesh Patar home at Monglapota |
145119 |
Construction Of Concrete road from Mohan Patar home to Ramesh Patar home at Monglapota1 |
Plinth level |
-
latitude : 22.869041666666664,22.869041666666664
Longitude : 87.41958000000001,87.41958000000001
file name : Image_24062021132924175.png
|
2021-06-24 13:29:24.280679 |
207 |
35039042 |
Construction Of Concrete road from Sdanga masjid to Asajul Mandal at Dakahin Kharkusma |
263171 |
Construction Of Concrete road from Sdanga masjid to Asajul Mandal at Dakahin Kharkusma1 |
Completion of work |
-
latitude : 22.861361699178815,22.861361699178815
Longitude : 87.43288239464164,87.43288239464164
file name : Image_15022021163538805.png
|
2021-02-15 16:35:38.885734 |
208 |
35039042 |
Construction Of Concrete road from Sdanga masjid to Asajul Mandal at Dakahin Kharkusma |
263171 |
Construction Of Concrete road from Sdanga masjid to Asajul Mandal at Dakahin Kharkusma1 |
Completion of work |
-
latitude : 22.86135172471404,22.86135172471404,22.86135172471404
Longitude : 87.43280536495149,87.43280536495149,87.43280536495149
file name : Image_11022021115153663.png
|
2021-02-11 11:51:53.763821 |
209 |
35409672 |
Construction Of Concrete road from Kanu Jana shop to Babunpara beltala at Lodha |
263663 |
Construction Of Concrete road from Kanu Jana shop to Babunpara beltala at Lodha1 |
Completion of work |
-
latitude : 22.853461378253996,22.85345274489373
Longitude : 87.46035349555314,87.46036958880723
file name : Image_15022021143807318.png
|
2021-02-15 14:38:07.409806 |
210 |
35190643 |
Construction Of Concrete road from Aju khan home to Pry School at Madnahari |
258469 |
Construction Of Concrete road from Aju khan home to Pry School at Madnahari1 |
Completion of work |
-
latitude : 22.864903807640076,22.864903807640076
Longitude : 87.42632900364697,87.42632900364697
file name : Image_16022021084454018.png
|
2021-02-16 08:44:54.141172 |
211 |
39106274 |
Construction Of Concrete Drain from Mahim Mandal home to Nasirul mandal house at Kharkusma |
282251 |
Construction Of Concrete Drain from Mahim Mandal home to Nasirul mandal house at Kharkusma 1 |
Plinth level |
-
latitude : 22.866047183051705,22.866047183051705
Longitude : 87.42836371064186,87.42836371064186
file name : Image_19022021084537335.png
|
2021-02-19 08:45:37.458429 |
212 |
39106274 |
Construction Of Concrete Drain from Mahim Mandal home to Nasirul mandal house at Kharkusma |
282251 |
Construction Of Concrete Drain from Mahim Mandal home to Nasirul mandal house at Kharkusma 1 |
Completion of work |
-
latitude : 22.86594555247575,22.86594475619495
Longitude : 87.4284927919507,87.42849069647491
file name : Image_15022021103327943.png
|
2021-02-15 10:33:28.056561 |
213 |
88472712 |
Water Supply to villages |
50000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.85404832,22.85405345
Longitude : 87.4305107,87.43051829
file name : Image_24112023164206740.png
|
2023-11-24 16:42:06.827677 |
214 |
88472712 |
Water Supply to villages |
50000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.8539936,22.8539936
Longitude : 87.4305668,87.4305668
file name : Image_24112023164031279.png
|
2023-11-24 16:40:31.369766 |
215 |
88472712 |
Water Supply to villages |
50000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.8539999,22.8539999
Longitude : 87.4305665,87.4305665
file name : Image_24112023163845690.png
|
2023-11-24 16:38:45.855743 |
216 |
39106308 |
Construction Of Concrete Drain from Asrar Bhangi home to Atu khan Home at Taldanga |
290000 |
Construction Of Concrete Drain from Asrar Bhangi home to Atu khan Home at Taldanga 1 |
Completion of work |
-
latitude : 22.855839999999997,22.8539887
Longitude : 87.43011833333334,87.4305489
file name : Image_11012022135933968.png
|
2022-01-11 13:59:34.089823 |
217 |
35860052 |
Construction Of Concrete road from Husen Mandal houseat Dakshin Paschim Kharkusma |
317467 |
Construction Of Concrete road from Husen Mandal houseat Dakshin Paschim Kharkusma1 |
Completion of work |
-
latitude : 22.8657,22.865708333333334
Longitude : 87.42708166666668,87.42708666666667
file name : Image_23122021121234308.png
|
2021-12-23 12:12:34.429612 |
218 |
49026857 |
Ghoramara Concrite Drain |
160486 |
Ghoramara Concrite Drain1 |
Plinth level |
-
latitude : 22.83178594
Longitude : 87.46330026
file name : Image_22032023135620749.png
|
2023-03-22 13:56:20.845283 |
219 |
49026857 |
Ghoramara Concrite Drain |
160486 |
Ghoramara Concrite Drain1 |
Roof laid |
-
latitude : 22.83177725
Longitude : 87.46330038
file name : Image_22032023140027916.png
|
2023-03-22 14:00:28.01312 |
220 |
49026857 |
Ghoramara Concrite Drain |
160486 |
Ghoramara Concrite Drain1 |
Completion of work |
-
latitude : 22.83187939
Longitude : 87.4633191
file name : Image_10032023141836065.png
|
2023-03-10 14:18:36.16353 |
221 |
46759548 |
Repair of Submersible pump & Pipe line at South Kharkusma |
90000 |
Repair of Submersible pump & Pipe line at South Kharkusma1 |
Roof laid |
-
latitude : 22.86494387
Longitude : 87.42888228
file name : Image_31082022125319285.png
|
2022-08-31 12:53:19.399645 |
222 |
46759548 |
Repair of Submersible pump & Pipe line at South Kharkusma |
90000 |
Repair of Submersible pump & Pipe line at South Kharkusma1 |
Plinth level |
-
latitude : 22.86495472
Longitude : 87.42892405
file name : Image_31082022124951711.png
|
2022-08-31 12:49:51.824024 |
223 |
46759548 |
Repair of Submersible pump & Pipe line at South Kharkusma |
90000 |
Repair of Submersible pump & Pipe line at South Kharkusma1 |
Completion of work |
-
latitude : 22.86487254
Longitude : 87.42893236
file name : Image_31082022123823999.png
|
2022-08-31 12:38:24.106169 |
224 |
46759548 |
Repair of Submersible pump & Pipe line at South Kharkusma |
90000 |
Repair of Submersible pump & Pipe line at South Kharkusma1 |
Completion of work |
-
latitude : 22.86491543
Longitude : 87.42888493
file name : Image_31082022123820512.png
|
2022-08-31 12:38:20.620617 |
225 |
59996478 |
Installation of Sub Marsibal Pump with Tank Chiraima Muslim para at Pursusha |
144357 |
Installation of Sub Marsibal Pump with Tank Chiraima Muslim para at Pursusha1 |
Completion of work |
-
latitude : 22.84499303
Longitude : 87.41880363
file name : Image_20042023131947634.png
|
2023-04-20 13:19:47.745928 |
226 |
59996478 |
Installation of Sub Marsibal Pump with Tank Chiraima Muslim para at Pursusha |
144357 |
Installation of Sub Marsibal Pump with Tank Chiraima Muslim para at Pursusha1 |
Plinth level |
-
latitude : 22.8449738
Longitude : 87.41877199
file name : Image_20042023132228258.png
|
2023-04-20 13:22:28.363172 |
227 |
59996478 |
Installation of Sub Marsibal Pump with Tank Chiraima Muslim para at Pursusha |
144357 |
Installation of Sub Marsibal Pump with Tank Chiraima Muslim para at Pursusha1 |
Roof laid |
-
latitude : 22.84494716
Longitude : 87.41870412
file name : Image_20042023132432586.png
|
2023-04-20 13:24:32.684467 |
228 |
59997518 |
Extension and Repair of G.P of Pipe Line at Parbotipur |
99468 |
Extension and Repair of G.P of Pipe Line at Parbotipur1 |
Roof laid |
-
latitude : 22.8539819
Longitude : 87.4305255
file name : Image_07062023130758741.png
|
2023-06-07 13:07:58.926088 |
229 |
59997518 |
Extension and Repair of G.P of Pipe Line at Parbotipur |
99468 |
Extension and Repair of G.P of Pipe Line at Parbotipur1 |
Completion of work |
-
latitude : 22.8539765
Longitude : 87.4305255
file name : Image_07062023130259079.png
|
2023-06-07 13:02:59.191067 |
230 |
59997518 |
Extension and Repair of G.P of Pipe Line at Parbotipur |
99468 |
Extension and Repair of G.P of Pipe Line at Parbotipur1 |
Plinth level |
-
latitude : 22.8539793
Longitude : 87.4305261
file name : Image_07062023130517462.png
|
2023-06-07 13:05:17.577106 |
231 |
59996884 |
Installation of Sub Marsibal Pump with Tank Ghoramara villege at Ghoramara |
144357 |
Installation of Sub Marsibal Pump with Tank Ghoramara villege at Ghoramara1 |
Roof laid |
-
latitude : 22.8319779
Longitude : 87.46332494
file name : Image_02012023142740419.png
|
2023-01-02 14:27:40.517595 |
232 |
59996884 |
Installation of Sub Marsibal Pump with Tank Ghoramara villege at Ghoramara |
144357 |
Installation of Sub Marsibal Pump with Tank Ghoramara villege at Ghoramara1 |
Plinth level |
-
latitude : 22.83188664
Longitude : 87.46319863
file name : Image_12122022132322107.png
|
2022-12-12 13:23:22.211228 |
233 |
59996884 |
Installation of Sub Marsibal Pump with Tank Ghoramara villege at Ghoramara |
144357 |
Installation of Sub Marsibal Pump with Tank Ghoramara villege at Ghoramara1 |
Completion of work |
-
latitude : 22.83191871
Longitude : 87.46299098
file name : Image_22112022082551832.png
|
2022-11-22 08:25:52.242497 |
234 |
59992735 |
Installation of sub Marsibal pump with Tank near Anandanagar Pry. School at Anandanagar |
169475 |
Installation of sub Marsibal pump with Tank near Anandanagar Pry. School at Anandanagar1 |
Completion of work |
-
latitude : 22.84623194
Longitude : 87.44919193
file name : Image_11052023142011867.png
|
2023-05-11 14:20:11.982326 |
235 |
59992735 |
Installation of sub Marsibal pump with Tank near Anandanagar Pry. School at Anandanagar |
169475 |
Installation of sub Marsibal pump with Tank near Anandanagar Pry. School at Anandanagar1 |
Plinth level |
-
latitude : 22.84624666
Longitude : 87.44923938
file name : Image_11052023142349869.png
|
2023-05-11 14:23:49.974204 |
236 |
59992735 |
Installation of sub Marsibal pump with Tank near Anandanagar Pry. School at Anandanagar |
169475 |
Installation of sub Marsibal pump with Tank near Anandanagar Pry. School at Anandanagar1 |
Roof laid |
-
latitude : 22.84628105
Longitude : 87.44926508
file name : Image_11052023142550616.png
|
2023-05-11 14:25:50.734509 |
237 |
59940022 |
Construction Of Concrete road from Rabiayl Mondal home to Rahaman khan house at Madnahari |
298890 |
Construction Of Concrete road from Rabiayl Mondal home to Rahaman khan house at Madnahari1 |
Completion of work |
-
latitude : 22.86167449,22.86167449
Longitude : 87.42485141,87.42485141
file name : Image_31052023183256605.png
|
2023-05-31 18:32:56.679976 |
238 |
59940022 |
Construction Of Concrete road from Rabiayl Mondal home to Rahaman khan house at Madnahari |
298890 |
Construction Of Concrete road from Rabiayl Mondal home to Rahaman khan house at Madnahari1 |
Plinth level |
-
latitude : 22.86166035,22.8616612
Longitude : 87.42488868,87.42488824
file name : Image_31052023183405630.png
|
2023-05-31 18:34:05.705458 |
239 |
59940022 |
Construction Of Concrete road from Rabiayl Mondal home to Rahaman khan house at Madnahari |
298890 |
Construction Of Concrete road from Rabiayl Mondal home to Rahaman khan house at Madnahari1 |
Roof laid |
-
latitude : 22.86160977,22.86160977
Longitude : 87.42491113,87.42491113
file name : Image_31052023183626661.png
|
2023-05-31 18:36:26.741783 |
240 |
66828794 |
Installation Of Street light near Pursusha Sansad |
100000 |
Installation Of Street light near Pursusha Sansad1 |
Completion of work |
-
latitude : 22.8443786
Longitude : 87.41841493
file name : Image_17062023101900255.png
|
2023-06-17 10:19:00.363005 |
241 |
66828794 |
Installation Of Street light near Pursusha Sansad |
100000 |
Installation Of Street light near Pursusha Sansad1 |
Plinth level |
-
latitude : 22.84436288
Longitude : 87.41839025
file name : Image_17062023102340725.png
|
2023-06-17 10:23:40.840629 |
242 |
66828794 |
Installation Of Street light near Pursusha Sansad |
100000 |
Installation Of Street light near Pursusha Sansad1 |
Plinth level |
-
latitude : 22.84434982
Longitude : 87.41838289
file name : Image_17062023102434218.png
|
2023-06-17 10:24:34.333076 |
243 |
66828794 |
Installation Of Street light near Pursusha Sansad |
100000 |
Installation Of Street light near Pursusha Sansad1 |
Roof laid |
-
latitude : 22.84435956
Longitude : 87.41839122
file name : Image_17062023102639650.png
|
2023-06-17 10:26:39.76663 |
244 |
59979157 |
Construction Of Concrete Drain from Jele Para culvat to Nadighat at Uttar Kharkusma |
275000 |
Construction Of Concrete Drain from Jele Para culvat to Nadighat at Uttar Kharkusma1 |
Roof laid |
-
latitude : 22.86867379,22.86867379
Longitude : 87.42960818,87.42960818
file name : Image_17052023135901921.png
|
2023-05-17 13:59:02.019885 |
245 |
59979157 |
Construction Of Concrete Drain from Jele Para culvat to Nadighat at Uttar Kharkusma |
275000 |
Construction Of Concrete Drain from Jele Para culvat to Nadighat at Uttar Kharkusma1 |
Completion of work |
-
latitude : 22.86852676,22.86852736
Longitude : 87.4296655,87.42966075
file name : Image_17052023135312377.png
|
2023-05-17 13:53:12.473458 |
246 |
59979157 |
Construction Of Concrete Drain from Jele Para culvat to Nadighat at Uttar Kharkusma |
275000 |
Construction Of Concrete Drain from Jele Para culvat to Nadighat at Uttar Kharkusma1 |
Plinth level |
-
latitude : 22.86859431,22.86859427
Longitude : 87.42960731,87.42960682
file name : Image_17052023135702207.png
|
2023-05-17 13:57:02.31638 |
247 |
59993038 |
Anandanagar Pry. School submersible repair |
50000 |
Anandanagar Pry. School submersible repair1 |
Completion of work |
-
latitude : 22.84559979
Longitude : 87.44936547
file name : Image_31032023172905735.png
|
2023-03-31 17:29:05.835494 |
248 |
59993038 |
Anandanagar Pry. School submersible repair |
50000 |
Anandanagar Pry. School submersible repair1 |
Plinth level |
-
latitude : 22.84557041
Longitude : 87.44941506
file name : Image_31032023173143419.png
|
2023-03-31 17:31:43.523624 |
249 |
59993038 |
Anandanagar Pry. School submersible repair |
50000 |
Anandanagar Pry. School submersible repair1 |
Roof laid |
-
latitude : 22.84557112
Longitude : 87.44939918
file name : Image_31032023173326048.png
|
2023-03-31 17:33:26.179894 |
250 |
59976879 |
Construction Of Concrete Drain from Grampnchayet office to Parbotipur Hospital at Dhanyachora |
325885 |
Construction Of Concrete Drain from Grampnchayet office to Parbotipur Hospital at Dhanyachora1 |
Completion of work |
-
latitude : 22.85323595,22.85323595
Longitude : 87.4284977,87.4284977
file name : Image_13052023110548456.png
|
2023-05-13 11:05:48.55057 |
251 |
59976879 |
Construction Of Concrete Drain from Grampnchayet office to Parbotipur Hospital at Dhanyachora |
325885 |
Construction Of Concrete Drain from Grampnchayet office to Parbotipur Hospital at Dhanyachora1 |
Plinth level |
-
latitude : 22.85322794,22.85322871
Longitude : 87.42847884,87.42847595
file name : Image_13052023110841152.png
|
2023-05-13 11:08:41.252073 |
252 |
59976879 |
Construction Of Concrete Drain from Grampnchayet office to Parbotipur Hospital at Dhanyachora |
325885 |
Construction Of Concrete Drain from Grampnchayet office to Parbotipur Hospital at Dhanyachora1 |
Roof laid |
-
latitude : 22.85323374,22.85323715
Longitude : 87.4284499,87.42844902
file name : Image_13052023111002303.png
|
2023-05-13 11:10:02.436901 |
253 |
59976879 |
Construction Of Concrete Drain from Grampnchayet office to Parbotipur Hospital at Dhanyachora |
325885 |
Construction Of Concrete Drain from Grampnchayet office to Parbotipur Hospital at Dhanyachora1 |
Roof laid |
-
latitude : 22.85322073,22.85322073
Longitude : 87.42844332,87.42844332
file name : Image_13052023111044567.png
|
2023-05-13 11:10:44.651246 |
254 |
66038952 |
Installation Of Street light near Malbandi Shitala Mandir at Malbandi |
130000 |
Installation Of Street light near Malbandi Shitala Mandir at Malbandi1 |
Roof laid |
-
latitude : 22.84767661
Longitude : 87.46731927
file name : Image_19012023114635203.png
|
2023-01-19 11:46:35.328842 |
255 |
66038952 |
Installation Of Street light near Malbandi Shitala Mandir at Malbandi |
130000 |
Installation Of Street light near Malbandi Shitala Mandir at Malbandi1 |
Completion of work |
-
latitude : 22.84772417
Longitude : 87.4672729
file name : Image_02012023135656605.png
|
2023-01-02 13:56:56.732744 |
256 |
66038952 |
Installation Of Street light near Malbandi Shitala Mandir at Malbandi |
130000 |
Installation Of Street light near Malbandi Shitala Mandir at Malbandi1 |
Plinth level |
-
latitude : 22.84769767
Longitude : 87.46734981
file name : Image_02012023135926902.png
|
2023-01-02 13:59:27.024928 |
257 |
59983241 |
Construction Of Concrete Drain from Ghoramara Pry. School to Pich Rasta at Ghoramara |
275000 |
Construction Of Concrete Drain from Ghoramara Pry. School to Pich Rasta at Ghoramara1 |
Completion of work |
-
latitude : 22.8329438,22.8329438
Longitude : 87.46349993,87.46349993
file name : Image_20052023135357066.png
|
2023-05-20 13:53:57.191022 |
258 |
59983241 |
Construction Of Concrete Drain from Ghoramara Pry. School to Pich Rasta at Ghoramara |
275000 |
Construction Of Concrete Drain from Ghoramara Pry. School to Pich Rasta at Ghoramara1 |
Plinth level |
-
latitude : 22.83297268,22.83297282
Longitude : 87.46352113,87.46352136
file name : Image_20052023135658635.png
|
2023-05-20 13:56:58.735573 |
259 |
59983241 |
Construction Of Concrete Drain from Ghoramara Pry. School to Pich Rasta at Ghoramara |
275000 |
Construction Of Concrete Drain from Ghoramara Pry. School to Pich Rasta at Ghoramara1 |
Roof laid |
-
latitude : 22.8329601,22.8329601
Longitude : 87.46349143,87.46349143
file name : Image_20052023135829647.png
|
2023-05-20 13:58:29.74706 |
260 |
59995594 |
Installation of sub Marsibal pump with Tank near danga Uparbasti (Kharkusma D) at Dakahin Purba Kha |
158655 |
Installation of sub Marsibal pump with Tank near danga Uparbasti (Kharkusma D) at Dakahin Purba Kha1 |
Plinth level |
-
latitude : 22.85982926
Longitude : 87.43349804
file name : Image_09062023145221202.png
|
2023-06-09 14:52:21.303928 |
261 |
59995594 |
Installation of sub Marsibal pump with Tank near danga Uparbasti (Kharkusma D) at Dakahin Purba Kha |
158655 |
Installation of sub Marsibal pump with Tank near danga Uparbasti (Kharkusma D) at Dakahin Purba Kha1 |
Roof laid |
-
latitude : 22.85985254
Longitude : 87.4334467
file name : Image_09062023145410271.png
|
2023-06-09 14:54:10.370239 |
262 |
59995594 |
Installation of sub Marsibal pump with Tank near danga Uparbasti (Kharkusma D) at Dakahin Purba Kha |
158655 |
Installation of sub Marsibal pump with Tank near danga Uparbasti (Kharkusma D) at Dakahin Purba Kha1 |
Completion of work |
-
latitude : 22.85983328
Longitude : 87.43343411
file name : Image_09062023112502793.png
|
2023-06-09 11:25:02.888227 |
263 |
59985260 |
Installation of Marsibal pump Pipe Line Repiar Baladghata Villege at Baladghata |
175000 |
Installation of Marsibal pump Pipe Line Repiar Baladghata Villege at Baladghata1 |
Completion of work |
-
latitude : 22.85186073
Longitude : 87.47603065
file name : Image_13052023113032506.png
|
2023-05-13 11:30:32.606692 |
264 |
59985260 |
Installation of Marsibal pump Pipe Line Repiar Baladghata Villege at Baladghata |
175000 |
Installation of Marsibal pump Pipe Line Repiar Baladghata Villege at Baladghata1 |
Plinth level |
-
latitude : 22.85189485
Longitude : 87.47607831
file name : Image_13052023113318705.png
|
2023-05-13 11:33:18.800171 |
265 |
59985260 |
Installation of Marsibal pump Pipe Line Repiar Baladghata Villege at Baladghata |
175000 |
Installation of Marsibal pump Pipe Line Repiar Baladghata Villege at Baladghata1 |
Roof laid |
-
latitude : 22.85187267
Longitude : 87.47605608
file name : Image_13052023113525580.png
|
2023-05-13 11:35:25.669818 |
266 |
59978783 |
Construction Of Concrete Drain from Khankhan Samanta House to Birajpur Pry. School at Birajpur |
251159 |
Construction Of Concrete Drain from Khankhan Samanta House to Birajpur Pry. School at Birajpur1 |
Completion of work |
-
latitude : 22.83634439,22.83634281
Longitude : 87.48058669,87.48059133
file name : Image_02042023142027796.png
|
2023-04-02 14:20:27.887175 |
267 |
59978783 |
Construction Of Concrete Drain from Khankhan Samanta House to Birajpur Pry. School at Birajpur |
251159 |
Construction Of Concrete Drain from Khankhan Samanta House to Birajpur Pry. School at Birajpur1 |
Plinth level |
-
latitude : 22.83639575,22.83639575
Longitude : 87.48059461,87.48059461
file name : Image_02042023142308097.png
|
2023-04-02 14:23:08.18279 |
268 |
59978783 |
Construction Of Concrete Drain from Khankhan Samanta House to Birajpur Pry. School at Birajpur |
251159 |
Construction Of Concrete Drain from Khankhan Samanta House to Birajpur Pry. School at Birajpur1 |
Roof laid |
-
latitude : 22.83638277,22.83638277
Longitude : 87.48059955,87.48059955
file name : Image_02042023142447869.png
|
2023-04-02 14:24:47.951769 |
269 |
59978783 |
Construction Of Concrete Drain from Khankhan Samanta House to Birajpur Pry. School at Birajpur |
251159 |
Construction Of Concrete Drain from Khankhan Samanta House to Birajpur Pry. School at Birajpur1 |
Roof laid |
-
latitude : 22.83638022,22.83638083
Longitude : 87.48060055,87.48060122
file name : Image_02042023142552541.png
|
2023-04-02 14:25:52.627822 |
270 |
59950089 |
Computer Repair G. P Office |
195000 |
Computer Repair G. P Office1 |
Roof laid |
-
latitude : 22.8540128
Longitude : 87.4305867
file name : Image_30062022183837220.png
|
2022-06-30 18:38:37.350541 |
271 |
59950089 |
Computer Repair G. P Office |
195000 |
Computer Repair G. P Office1 |
Plinth level |
-
latitude : 22.8539919
Longitude : 87.4305927
file name : Image_30062022183636889.png
|
2022-06-30 18:36:37.041152 |
272 |
59950089 |
Computer Repair G. P Office |
195000 |
Computer Repair G. P Office1 |
Completion of work |
-
latitude : 22.854025
Longitude : 87.430582
file name : Image_30062022183425031.png
|
2022-06-30 18:34:25.125409 |
273 |
59950089 |
Computer Repair G. P Office |
195000 |
Computer Repair G. P Office1 |
Completion of work |
-
latitude : 22.854025
Longitude : 87.430582
file name : Image_30062022183416332.png
|
2022-06-30 18:34:16.426715 |
274 |
59950089 |
Computer Repair G. P Office |
195000 |
Computer Repair G. P Office2 |
Completion of work |
-
latitude : 22.8540048
Longitude : 87.4305713
file name : Image_30062022183413326.png
|
2022-06-30 18:34:13.426202 |
275 |
46763831 |
Gp office Goudown repair & colour |
349421 |
Gp office Goudown repair & colour1 |
Completion of work |
-
latitude : 22.8539773
Longitude : 87.4304954
file name : Image_13022023124113777.png
|
2023-02-13 12:41:13.880324 |
276 |
46763831 |
Gp office Goudown repair & colour |
349421 |
Gp office Goudown repair & colour1 |
Plinth level |
-
latitude : 22.8539768
Longitude : 87.430502
file name : Image_18022023162717525.png
|
2023-02-18 16:27:17.608485 |
277 |
46763831 |
Gp office Goudown repair & colour |
349421 |
Gp office Goudown repair & colour1 |
Roof laid |
-
latitude : 22.853977
Longitude : 87.4304985
file name : Image_18022023163257978.png
|
2023-02-18 16:32:58.087577 |
278 |
49025951 |
madnahari kabarstan drain repair |
160066 |
madnahari kabarstan drain repair1 |
Completion of work |
-
latitude : 22.86521302
Longitude : 87.42394473
file name : Image_02042023131505233.png
|
2023-04-02 13:15:05.31983 |
279 |
49025951 |
madnahari kabarstan drain repair |
160066 |
madnahari kabarstan drain repair1 |
Plinth level |
-
latitude : 22.86521271
Longitude : 87.42401551
file name : Image_02042023131744480.png
|
2023-04-02 13:17:44.562703 |
280 |
49025951 |
madnahari kabarstan drain repair |
160066 |
madnahari kabarstan drain repair1 |
Roof laid |
-
latitude : 22.86520375
Longitude : 87.42398055
file name : Image_02042023131927730.png
|
2023-04-02 13:19:27.838196 |
281 |
46750809 |
Instalation of Submersible pump Near Dhalma Atchala |
239787 |
Instalation of Submersible pump Near Dhalma Atchala1 |
Roof laid |
-
latitude : 22.8310744
Longitude : 87.45020058
file name : Image_30052022164443106.png
|
2022-05-30 16:44:43.21451 |
282 |
46750809 |
Instalation of Submersible pump Near Dhalma Atchala |
239787 |
Instalation of Submersible pump Near Dhalma Atchala1 |
Roof laid |
-
latitude : 22.831761
Longitude : 87.4497146
file name : Image_30052022164351553.png
|
2022-05-30 16:43:51.666466 |
283 |
46750809 |
Instalation of Submersible pump Near Dhalma Atchala |
239787 |
Instalation of Submersible pump Near Dhalma Atchala1 |
Plinth level |
-
latitude : 22.83106136
Longitude : 87.45023045
file name : Image_30052022164032598.png
|
2022-05-30 16:40:32.708009 |
284 |
46750809 |
Instalation of Submersible pump Near Dhalma Atchala |
239787 |
Instalation of Submersible pump Near Dhalma Atchala1 |
Plinth level |
-
latitude : 22.83105757
Longitude : 87.45021795
file name : Image_30052022164106794.png
|
2022-05-30 16:41:06.902862 |
285 |
46750809 |
Instalation of Submersible pump Near Dhalma Atchala |
239787 |
Instalation of Submersible pump Near Dhalma Atchala1 |
Completion of work |
-
latitude : 22.83104666
Longitude : 87.45017408
file name : Image_30052022163613088.png
|
2022-05-30 16:36:13.222077 |
286 |
46750809 |
Instalation of Submersible pump Near Dhalma Atchala |
239787 |
Instalation of Submersible pump Near Dhalma Atchala1 |
Completion of work |
-
latitude : 22.831761
Longitude : 87.4497146
file name : Image_30052022163535392.png
|
2022-05-30 16:35:35.516002 |
287 |
46762172 |
Construction of concret drain from U.Kharkusma Ruidas para to jele ghut |
252370 |
Construction of concret drain from U.Kharkusma Ruidas para to jele ghut1 |
Completion of work |
-
latitude : 22.86712082
Longitude : 87.42647003
file name : Image_02042023133217429.png
|
2023-04-02 13:32:17.51858 |
288 |
46762172 |
Construction of concret drain from U.Kharkusma Ruidas para to jele ghut |
252370 |
Construction of concret drain from U.Kharkusma Ruidas para to jele ghut1 |
Plinth level |
-
latitude : 22.86827782
Longitude : 87.42932857
file name : Image_02042023133452900.png
|
2023-04-02 13:34:52.983056 |
289 |
46762172 |
Construction of concret drain from U.Kharkusma Ruidas para to jele ghut |
252370 |
Construction of concret drain from U.Kharkusma Ruidas para to jele ghut1 |
Roof laid |
-
latitude : 22.86829701
Longitude : 87.4293424
file name : Image_02042023134023837.png
|
2023-04-02 13:40:23.922115 |
290 |
46749658 |
Instlation of submersible pump with pipeline at Anandanagar Dhannyachora |
239787 |
Instlation of submersible pump with pipeline at Anandanagar Dhannyachora1 |
Roof laid |
-
latitude : 22.84395909
Longitude : 87.45250591
file name : Image_13072022110114969.png
|
2022-07-13 11:01:15.073785 |
291 |
46749658 |
Instlation of submersible pump with pipeline at Anandanagar Dhannyachora |
239787 |
Instlation of submersible pump with pipeline at Anandanagar Dhannyachora1 |
Completion of work |
-
latitude : 22.84400059
Longitude : 87.45246581
file name : Image_13072022105746731.png
|
2022-07-13 10:57:46.840827 |
292 |
46749658 |
Instlation of submersible pump with pipeline at Anandanagar Dhannyachora |
239787 |
Instlation of submersible pump with pipeline at Anandanagar Dhannyachora1 |
Plinth level |
-
latitude : 22.84398018
Longitude : 87.45247843
file name : Image_13072022105919091.png
|
2022-07-13 10:59:19.20193 |
293 |
46749658 |
Instlation of submersible pump with pipeline at Anandanagar Dhannyachora |
239787 |
Instlation of submersible pump with pipeline at Anandanagar Dhannyachora1 |
Completion of work |
-
latitude : 22.84390654
Longitude : 87.45239424
file name : Image_13072022105654901.png
|
2022-07-13 10:56:55.01451 |
294 |
46765913 |
Instalation of Low musk light at Parbotipur near G.P office |
95000 |
Instalation of Low musk light at Parbotipur near G.P office1 |
Plinth level |
-
latitude : 22.8539779
Longitude : 87.4304742
file name : Image_02042023135719523.png
|
2023-04-02 13:57:19.606446 |
295 |
46765913 |
Instalation of Low musk light at Parbotipur near G.P office |
95000 |
Instalation of Low musk light at Parbotipur near G.P office1 |
Roof laid |
-
latitude : 22.853978
Longitude : 87.4304734
file name : Image_02042023135902290.png
|
2023-04-02 13:59:02.389453 |
296 |
46765913 |
Instalation of Low musk light at Parbotipur near G.P office |
95000 |
Instalation of Low musk light at Parbotipur near G.P office1 |
Completion of work |
-
latitude : 22.8548174
Longitude : 87.4304133
file name : Image_10032023164746264.png
|
2023-03-10 16:47:46.366726 |
297 |
46764227 |
Construction of Toilet at GP office for public use |
300000 |
Construction of Toilet at GP office for public use1 |
Roof laid |
-
latitude : 22.8539785
Longitude : 87.4305544
file name : Image_10052023132820125.png
|
2023-05-10 13:28:20.234398 |
298 |
46764227 |
Construction of Toilet at GP office for public use |
300000 |
Construction of Toilet at GP office for public use1 |
Plinth level |
-
latitude : 22.8539788
Longitude : 87.4305077
file name : Image_04042023121822055.png
|
2023-04-04 12:18:22.146385 |
299 |
46764227 |
Construction of Toilet at GP office for public use |
300000 |
Construction of Toilet at GP office for public use1 |
Completion of work |
-
latitude : 22.8539794
Longitude : 87.4305057
file name : Image_21032023124614433.png
|
2023-03-21 12:46:14.547883 |
300 |
46764908 |
Water testing |
40000 |
Water testing1 |
Roof laid |
-
latitude : 22.85214341
Longitude : 87.42523723
file name : Image_28092022142322280.png
|
2022-09-28 14:23:22.382925 |
301 |
46764908 |
Water testing |
40000 |
Water testing1 |
Completion of work |
-
latitude : 22.85212009
Longitude : 87.42512817
file name : Image_28092022142034416.png
|
2022-09-28 14:20:34.519226 |
302 |
46764908 |
Water testing |
40000 |
Water testing1 |
Completion of work |
-
latitude : 22.85211448
Longitude : 87.42511902
file name : Image_28092022142041540.png
|
2022-09-28 14:20:41.636917 |
303 |
46764908 |
Water testing |
40000 |
Water testing1 |
Completion of work |
-
latitude : 22.85213679
Longitude : 87.42515327
file name : Image_28092022142048873.png
|
2022-09-28 14:20:48.988198 |
304 |
46764908 |
Water testing |
40000 |
Water testing1 |
Completion of work |
-
latitude : 22.85211448
Longitude : 87.42511902
file name : Image_28092022142057126.png
|
2022-09-28 14:20:57.227811 |
305 |
46764908 |
Water testing |
40000 |
Water testing1 |
Completion of work |
-
latitude : 22.85213679
Longitude : 87.42515327
file name : Image_28092022142107419.png
|
2022-09-28 14:21:07.513831 |
306 |
46764908 |
Water testing |
40000 |
Water testing1 |
Completion of work |
-
latitude : 22.85210804
Longitude : 87.42512876
file name : Image_28092022141241976.png
|
2022-09-28 14:12:42.079354 |
307 |
46747523 |
Instlation of submersible pump with pipeline at Monglapota |
144357 |
Instlation of submersible pump with pipeline at Monglapota1 |
Roof laid |
-
latitude : 22.86872501
Longitude : 87.41876463
file name : Image_04042023125137750.png
|
2023-04-04 12:51:37.849503 |
308 |
46747523 |
Instlation of submersible pump with pipeline at Monglapota |
144357 |
Instlation of submersible pump with pipeline at Monglapota1 |
Completion of work |
-
latitude : 22.86878954
Longitude : 87.41869431
file name : Image_02042023130348386.png
|
2023-04-02 13:03:48.469117 |
309 |
46747523 |
Instlation of submersible pump with pipeline at Monglapota |
144357 |
Instlation of submersible pump with pipeline at Monglapota1 |
Plinth level |
-
latitude : 22.86879321
Longitude : 87.41869065
file name : Image_02042023130750455.png
|
2023-04-02 13:07:50.562066 |
310 |
46746850 |
Instlation of submersible pump with pipeline at Madnahari Monglapota Gorasthan |
144357 |
Instlation of submersible pump with pipeline at Madnahari Monglapota Gorasthan1 |
Plinth level |
-
latitude : 22.86511874
Longitude : 87.42204557
file name : Image_22032023151011380.png
|
2023-03-22 15:10:11.475618 |
311 |
46746850 |
Instlation of submersible pump with pipeline at Madnahari Monglapota Gorasthan |
144357 |
Instlation of submersible pump with pipeline at Madnahari Monglapota Gorasthan1 |
Roof laid |
-
latitude : 22.86512142
Longitude : 87.42207926
file name : Image_22032023151537512.png
|
2023-03-22 15:15:37.606169 |
312 |
46746850 |
Instlation of submersible pump with pipeline at Madnahari Monglapota Gorasthan |
144357 |
Instlation of submersible pump with pipeline at Madnahari Monglapota Gorasthan1 |
Completion of work |
-
latitude : 22.86511355
Longitude : 87.42222783
file name : Image_10032023152400557.png
|
2023-03-10 15:24:00.654595 |
313 |
46758959 |
Construction of concret road from D. Kharkusma Salematulla Dalal house to Abutaher Dalal house |
199725 |
Construction of concret road from D. Kharkusma Salematulla Dalal house to Abutaher Dalal house1 |
Plinth level |
-
latitude : 22.86624632,22.86624632
Longitude : 87.43006326,87.43006326
file name : Image_21032023152719763.png
|
2023-03-21 15:27:19.84874 |
314 |
46758959 |
Construction of concret road from D. Kharkusma Salematulla Dalal house to Abutaher Dalal house |
199725 |
Construction of concret road from D. Kharkusma Salematulla Dalal house to Abutaher Dalal house1 |
Roof laid |
-
latitude : 22.86637364,22.86637364
Longitude : 87.42971925,87.42971925
file name : Image_21032023153120714.png
|
2023-03-21 15:31:20.798305 |
315 |
46758959 |
Construction of concret road from D. Kharkusma Salematulla Dalal house to Abutaher Dalal house |
199725 |
Construction of concret road from D. Kharkusma Salematulla Dalal house to Abutaher Dalal house1 |
Completion of work |
-
latitude : 22.86706888,22.86706888
Longitude : 87.42970345,87.42970345
file name : Image_10032023155758286.png
|
2023-03-10 15:57:58.388485 |
316 |
46751011 |
Construction of concret road from Ashoke Singh house to Subud Singh house at Pathortora |
201645 |
Construction of concret road from Ashoke Singh house to Subud Singh house at Pathortora1 |
Plinth level |
-
latitude : 22.83584577,22.83584577
Longitude : 87.42320611,87.42320611
file name : Image_22032023153429503.png
|
2023-03-22 15:34:29.612676 |
317 |
46751011 |
Construction of concret road from Ashoke Singh house to Subud Singh house at Pathortora |
201645 |
Construction of concret road from Ashoke Singh house to Subud Singh house at Pathortora1 |
Roof laid |
-
latitude : 22.83584658,22.83584798
Longitude : 87.42322111,87.42322179
file name : Image_22032023153625107.png
|
2023-03-22 15:36:25.21068 |
318 |
46751011 |
Construction of concret road from Ashoke Singh house to Subud Singh house at Pathortora |
201645 |
Construction of concret road from Ashoke Singh house to Subud Singh house at Pathortora1 |
Completion of work |
-
latitude : 22.83586401,22.83586401
Longitude : 87.42328315,87.42328315
file name : Image_10032023150009887.png
|
2023-03-10 15:00:09.975941 |
319 |
46763297 |
Instalation of Low musk light at U.Kharkusma Temahani Market |
95000 |
Instalation of Low musk light at U.Kharkusma Temahani Market1 |
Roof laid |
-
latitude : 22.86800034
Longitude : 87.4304864
file name : Image_04122022140954709.png
|
2022-12-04 14:09:54.794097 |
320 |
46763297 |
Instalation of Low musk light at U.Kharkusma Temahani Market |
95000 |
Instalation of Low musk light at U.Kharkusma Temahani Market1 |
Plinth level |
-
latitude : 22.86803965
Longitude : 87.43050625
file name : Image_04122022132321961.png
|
2022-12-04 13:23:22.035857 |
321 |
46763297 |
Instalation of Low musk light at U.Kharkusma Temahani Market |
95000 |
Instalation of Low musk light at U.Kharkusma Temahani Market1 |
Completion of work |
-
latitude : 22.8679979
Longitude : 87.43058092
file name : Image_12112022154521581.png
|
2022-11-12 15:45:21.683496 |
322 |
46754508 |
Instalation of Low musk light at Birajpur Lohar Para |
95000 |
Instalation of Low musk light at Birajpur Lohar Para1 |
Roof laid |
-
latitude : 22.84144467
Longitude : 87.4764369
file name : Image_12122022134617187.png
|
2022-12-12 13:46:17.287337 |
323 |
46754508 |
Instalation of Low musk light at Birajpur Lohar Para |
95000 |
Instalation of Low musk light at Birajpur Lohar Para1 |
Plinth level |
-
latitude : 22.84135224
Longitude : 87.47633849
file name : Image_18112022122302597.png
|
2022-11-18 12:23:02.695247 |
324 |
46754508 |
Instalation of Low musk light at Birajpur Lohar Para |
95000 |
Instalation of Low musk light at Birajpur Lohar Para1 |
Completion of work |
-
latitude : 22.83708716
Longitude : 87.48088157
file name : Image_18112022122113304.png
|
2022-11-18 12:21:13.406972 |
325 |
46754508 |
Instalation of Low musk light at Birajpur Lohar Para |
95000 |
Instalation of Low musk light at Birajpur Lohar Para1 |
Completion of work |
-
latitude : 22.84148549
Longitude : 87.47641845
file name : Image_12112022150100344.png
|
2022-11-12 15:01:00.452998 |
326 |
46754867 |
Instlation of submersible pump with pipeline at Baladghata purbapara |
144357 |
Instlation of submersible pump with pipeline at Baladghata purbapara1 |
Roof laid |
-
latitude : 22.84777752
Longitude : 87.47774203
file name : Image_02042023144412964.png
|
2023-04-02 14:44:13.06752 |
327 |
46754867 |
Instlation of submersible pump with pipeline at Baladghata purbapara |
144357 |
Instlation of submersible pump with pipeline at Baladghata purbapara1 |
Roof laid |
-
latitude : 22.84777725
Longitude : 87.47771655
file name : Image_02042023144704119.png
|
2023-04-02 14:47:04.221301 |
328 |
46754867 |
Instlation of submersible pump with pipeline at Baladghata purbapara |
144357 |
Instlation of submersible pump with pipeline at Baladghata purbapara1 |
Completion of work |
-
latitude : 22.84774132
Longitude : 87.47772851
file name : Image_10032023140804346.png
|
2023-03-10 14:08:04.441457 |
329 |
46754867 |
Instlation of submersible pump with pipeline at Baladghata purbapara |
144357 |
Instlation of submersible pump with pipeline at Baladghata purbapara1 |
Plinth level |
-
latitude : 22.84776093
Longitude : 87.47770284
file name : Image_10032023141104429.png
|
2023-03-10 14:11:04.533891 |
330 |
46746598 |
Instlation of submersible pump with pipeline at Madnahari Bazarpara |
144357 |
Instlation of submersible pump with pipeline at Madnahari Bazarpara 1 |
Roof laid |
-
latitude : 22.8677603
Longitude : 87.42725268
file name : Image_04032023133647508.png
|
2023-03-04 13:36:47.617639 |
331 |
46746598 |
Instlation of submersible pump with pipeline at Madnahari Bazarpara |
144357 |
Instlation of submersible pump with pipeline at Madnahari Bazarpara 1 |
Completion of work |
-
latitude : 22.8677761
Longitude : 87.42732518
file name : Image_01032023140222451.png
|
2023-03-01 14:02:22.577923 |
332 |
46746598 |
Instlation of submersible pump with pipeline at Madnahari Bazarpara |
144357 |
Instlation of submersible pump with pipeline at Madnahari Bazarpara 1 |
Plinth level |
-
latitude : 22.86776812
Longitude : 87.42730367
file name : Image_01032023140717085.png
|
2023-03-01 14:07:17.186594 |
333 |
48995972 |
Pathra new submarsle Pump & Paipe Line |
144357 |
Pathra new submarsle Pump & Paipe Line 1 |
Completion of work |
-
latitude : 22.86388884
Longitude : 87.43824104
file name : Image_04032023134350664.png
|
2023-03-04 13:43:50.772762 |
334 |
48995972 |
Pathra new submarsle Pump & Paipe Line |
144357 |
Pathra new submarsle Pump & Paipe Line 1 |
Plinth level |
-
latitude : 22.86385605
Longitude : 87.43829933
file name : Image_04032023134711327.png
|
2023-03-04 13:47:11.427636 |
335 |
48995972 |
Pathra new submarsle Pump & Paipe Line |
144357 |
Pathra new submarsle Pump & Paipe Line 1 |
Roof laid |
-
latitude : 22.86387765
Longitude : 87.4382782
file name : Image_04032023135103606.png
|
2023-03-04 13:51:03.71724 |
336 |
46757448 |
Instlation of submersible pump with pipeline at Ghoramara |
144357 |
Instlation of submersible pump with pipeline at Ghoramara1 |
Roof laid |
-
latitude : 22.83106491
Longitude : 87.46313569
file name : Image_20042023140928043.png
|
2023-04-20 14:09:28.138856 |
337 |
46757448 |
Instlation of submersible pump with pipeline at Ghoramara |
144357 |
Instlation of submersible pump with pipeline at Ghoramara1 |
Plinth level |
-
latitude : 22.83101707
Longitude : 87.46314574
file name : Image_02042023154827240.png
|
2023-04-02 15:48:27.343339 |
338 |
46757448 |
Instlation of submersible pump with pipeline at Ghoramara |
144357 |
Instlation of submersible pump with pipeline at Ghoramara1 |
Completion of work |
-
latitude : 22.83193616
Longitude : 87.46332982
file name : Image_10032023142157487.png
|
2023-03-10 14:21:57.574896 |
339 |
46757448 |
Instlation of submersible pump with pipeline at Ghoramara |
144357 |
Instlation of submersible pump with pipeline at Ghoramara1 |
Completion of work |
-
latitude : 22.83097738
Longitude : 87.46317218
file name : Image_10032023142326429.png
|
2023-03-10 14:23:26.528777 |
340 |
59998136 |
Submersible repair at Taldanga |
100000 |
Submersible repair at Taldanga1 |
Completion of work |
-
latitude : 22.8551023
Longitude : 87.43021158
file name : Image_31032023175556810.png
|
2023-03-31 17:55:56.89718 |
341 |
59998136 |
Submersible repair at Taldanga |
100000 |
Submersible repair at Taldanga1 |
Plinth level |
-
latitude : 22.85512376
Longitude : 87.43015443
file name : Image_31032023175827255.png
|
2023-03-31 17:58:27.346412 |
342 |
59998136 |
Submersible repair at Taldanga |
100000 |
Submersible repair at Taldanga1 |
Roof laid |
-
latitude : 22.85510217
Longitude : 87.4301978
file name : Image_31032023175952208.png
|
2023-03-31 17:59:52.306072 |
343 |
59982496 |
Construction Of Concrete Drain from Hasen Choudhawary House to Ali Hosen Mallick House at Dakahin Pu |
245213 |
Construction Of Concrete Drain from Hasen Choudhawary House to Ali Hosen Mallick House at Dakahin Pu1 |
Roof laid |
-
latitude : 22.8621634,22.86216515
Longitude : 87.43234968,87.4323542
file name : Image_20042023134520895.png
|
2023-04-20 13:45:20.999864 |
344 |
59982496 |
Construction Of Concrete Drain from Hasen Choudhawary House to Ali Hosen Mallick House at Dakahin Pu |
245213 |
Construction Of Concrete Drain from Hasen Choudhawary House to Ali Hosen Mallick House at Dakahin Pu1 |
Completion of work |
-
latitude : 22.86212286,22.86212286
Longitude : 87.43240899,87.43240899
file name : Image_02042023134905183.png
|
2023-04-02 13:49:05.269839 |
345 |
59982496 |
Construction Of Concrete Drain from Hasen Choudhawary House to Ali Hosen Mallick House at Dakahin Pu |
245213 |
Construction Of Concrete Drain from Hasen Choudhawary House to Ali Hosen Mallick House at Dakahin Pu1 |
Plinth level |
-
latitude : 22.86214781,22.86214781
Longitude : 87.43234841,87.43234841
file name : Image_02042023135123002.png
|
2023-04-02 13:51:23.088071 |
346 |
59992444 |
Installation of Sub Marsibal Pump with Tank and Pipe Line Paresh Jana House at Lodha |
144357 |
Installation of Sub Marsibal Pump with Tank and Pipe Line Paresh Jana House at Lodha1 |
Roof laid |
-
latitude : 22.85332206
Longitude : 87.4741136
file name : Image_12122022141622483.png
|
2022-12-12 14:16:22.577415 |
347 |
59992444 |
Installation of Sub Marsibal Pump with Tank and Pipe Line Paresh Jana House at Lodha |
144357 |
Installation of Sub Marsibal Pump with Tank and Pipe Line Paresh Jana House at Lodha1 |
Plinth level |
-
latitude : 22.85735204
Longitude : 87.45888682
file name : Image_24112022153018232.png
|
2022-11-24 15:30:18.329432 |
348 |
59992444 |
Installation of Sub Marsibal Pump with Tank and Pipe Line Paresh Jana House at Lodha |
144357 |
Installation of Sub Marsibal Pump with Tank and Pipe Line Paresh Jana House at Lodha1 |
Completion of work |
-
latitude : 22.85738978
Longitude : 87.458886
file name : Image_24112022152654931.png
|
2022-11-24 15:26:55.048055 |
349 |
59993607 |
Installition of pipe line Aliyar Choudhwary House to Dill Mahammad Mandal House at Mathuri |
144357 |
Installition of pipe line Aliyar Choudhwary House to Dill Mahammad Mandal House at Mathuri1 |
Roof laid |
-
latitude : 22.85978488
Longitude : 87.43613399
file name : Image_21122022130428147.png
|
2022-12-21 13:04:28.24255 |
350 |
59993607 |
Installition of pipe line Aliyar Choudhwary House to Dill Mahammad Mandal House at Mathuri |
144357 |
Installition of pipe line Aliyar Choudhwary House to Dill Mahammad Mandal House at Mathuri1 |
Plinth level |
-
latitude : 22.85975603
Longitude : 87.43606606
file name : Image_06122022100317784.png
|
2022-12-06 10:03:17.87149 |
351 |
59993607 |
Installition of pipe line Aliyar Choudhwary House to Dill Mahammad Mandal House at Mathuri |
144357 |
Installition of pipe line Aliyar Choudhwary House to Dill Mahammad Mandal House at Mathuri1 |
Completion of work |
-
latitude : 22.85977633
Longitude : 87.43616412
file name : Image_06122022100003571.png
|
2022-12-06 10:00:03.699924 |
352 |
59995258 |
Submersible repair at Taldanga |
144357 |
Submersible repair at Taldanga1 |
Roof laid |
-
latitude : 22.85853585
Longitude : 87.43213012
file name : Image_21122022130716795.png
|
2022-12-21 13:07:16.882124 |
353 |
59995258 |
Submersible repair at Taldanga |
144357 |
Submersible repair at Taldanga1 |
Plinth level |
-
latitude : 22.8586785
Longitude : 87.43244566
file name : Image_06122022101105935.png
|
2022-12-06 10:11:06.020897 |
354 |
59995258 |
Submersible repair at Taldanga |
144357 |
Submersible repair at Taldanga1 |
Completion of work |
-
latitude : 22.85874401
Longitude : 87.43244563
file name : Image_04122022131725394.png
|
2022-12-04 13:17:25.480366 |
355 |
59995883 |
Installation of Pipe Line Daskin Paschim Gramin at Dakahin Paschim Kharkusma |
243481 |
Installation of Pipe Line Daskin Paschim Gramin at Dakahin Paschim Kharkusma 1 |
Roof laid |
-
latitude : 22.8655749
Longitude : 87.42713023
file name : Image_02012023135614595.png
|
2023-01-02 13:56:14.705325 |
356 |
59995883 |
Installation of Pipe Line Daskin Paschim Gramin at Dakahin Paschim Kharkusma |
243481 |
Installation of Pipe Line Daskin Paschim Gramin at Dakahin Paschim Kharkusma 1 |
Roof laid |
-
latitude : 22.8655749
Longitude : 87.42713023
file name : Image_02012023133326710.png
|
2023-01-02 13:33:26.810489 |
357 |
59995883 |
Installation of Pipe Line Daskin Paschim Gramin at Dakahin Paschim Kharkusma |
243481 |
Installation of Pipe Line Daskin Paschim Gramin at Dakahin Paschim Kharkusma 1 |
Plinth level |
-
latitude : 22.86560572
Longitude : 87.42727796
file name : Image_13122022112312934.png
|
2022-12-13 11:23:13.035922 |
358 |
59995883 |
Installation of Pipe Line Daskin Paschim Gramin at Dakahin Paschim Kharkusma |
243481 |
Installation of Pipe Line Daskin Paschim Gramin at Dakahin Paschim Kharkusma 1 |
Completion of work |
-
latitude : 22.83190171
Longitude : 87.46326885
file name : Image_22112022142649389.png
|
2022-11-22 14:26:49.904544 |
359 |
59993981 |
Installation of Sub Marsibal Pump with Tank Manglapota Rajapara at Manglapota |
144403 |
Installation of Sub Marsibal Pump with Tank Manglapota Rajapara at Manglapota1 |
Roof laid |
-
latitude : 22.86733912
Longitude : 87.42106601
file name : Image_06122022094517051.png
|
2022-12-06 09:45:17.157287 |
360 |
59993981 |
Installation of Sub Marsibal Pump with Tank Manglapota Rajapara at Manglapota |
144403 |
Installation of Sub Marsibal Pump with Tank Manglapota Rajapara at Manglapota1 |
Plinth level |
-
latitude : 22.86732797
Longitude : 87.4210557
file name : Image_06122022094247685.png
|
2022-12-06 09:42:47.787004 |
361 |
59993981 |
Installation of Sub Marsibal Pump with Tank Manglapota Rajapara at Manglapota |
144403 |
Installation of Sub Marsibal Pump with Tank Manglapota Rajapara at Manglapota1 |
Completion of work |
-
latitude : 22.86730244
Longitude : 87.42107999
file name : Image_28112022115322956.png
|
2022-11-28 11:53:23.081431 |
362 |
59982736 |
Re-Excavation of Concrete Drain at Dakahin Purba Kharkusma |
75000 |
Re-Excavation of Concrete Drain at Dakahin Purba Kharkusma 1 |
Completion of work |
-
latitude : 22.85851188,22.85851747
Longitude : 87.43285522,87.43284541
file name : Image_18112022161432911.png
|
2022-11-18 16:14:33.003503 |
363 |
59982736 |
Re-Excavation of Concrete Drain at Dakahin Purba Kharkusma |
75000 |
Re-Excavation of Concrete Drain at Dakahin Purba Kharkusma 1 |
Plinth level |
-
latitude : 22.85855578,22.85855699
Longitude : 87.43276924,87.43276176
file name : Image_18112022161624034.png
|
2022-11-18 16:16:24.1255 |
364 |
59982736 |
Re-Excavation of Concrete Drain at Dakahin Purba Kharkusma |
75000 |
Re-Excavation of Concrete Drain at Dakahin Purba Kharkusma 1 |
Roof laid |
-
latitude : 22.85868808,22.8586891,22.85869069
Longitude : 87.43246322,87.43246573,87.43247204
file name : Image_18112022161810892.png
|
2022-11-18 16:18:10.989386 |
365 |
59994428 |
Installation of Sub Marsibal Pump Repiar pathartora sansad |
175000 |
Installation of Sub Marsibal Pump Repiar pathartora sansad1 |
Roof laid |
-
latitude : 22.84807598
Longitude : 87.42232892
file name : Image_28092022140836109.png
|
2022-09-28 14:08:36.200257 |
366 |
59994428 |
Installation of Sub Marsibal Pump Repiar pathartora sansad |
175000 |
Installation of Sub Marsibal Pump Repiar pathartora sansad1 |
Plinth level |
-
latitude : 22.84812694
Longitude : 87.42231533
file name : Image_28092022140555254.png
|
2022-09-28 14:05:55.335731 |
367 |
59994428 |
Installation of Sub Marsibal Pump Repiar pathartora sansad |
175000 |
Installation of Sub Marsibal Pump Repiar pathartora sansad1 |
Completion of work |
-
latitude : 22.84813353
Longitude : 87.42232295
file name : Image_28092022140227056.png
|
2022-09-28 14:02:27.142126 |
368 |
59938925 |
Installation & repair Of Street light near Ruidas para Mansa Mandir at Uttar Kharkusma |
95000 |
Installation & repair Of Street light near Ruidas para Mansa Mandir at Uttar Kharkusma1 |
Roof laid |
-
latitude : 22.8675738
Longitude : 87.4284296
file name : Image_04122022141759486.png
|
2022-12-04 14:17:59.566005 |
369 |
59938925 |
Installation & repair Of Street light near Ruidas para Mansa Mandir at Uttar Kharkusma |
95000 |
Installation & repair Of Street light near Ruidas para Mansa Mandir at Uttar Kharkusma1 |
Plinth level |
-
latitude : 22.8675732
Longitude : 87.4284292
file name : Image_04122022141449468.png
|
2022-12-04 14:14:49.562801 |
370 |
59938925 |
Installation & repair Of Street light near Ruidas para Mansa Mandir at Uttar Kharkusma |
95000 |
Installation & repair Of Street light near Ruidas para Mansa Mandir at Uttar Kharkusma1 |
Completion of work |
-
latitude : 22.867544
Longitude : 87.4284055
file name : Image_12112022154340945.png
|
2022-11-12 15:43:41.052018 |
371 |
59945573 |
Street light repair at Dhannyachora sansad |
95000 |
Street light repair at Dhannyachora sansad1 |
Plinth level |
-
latitude : 22.84905807
Longitude : 87.43455688
file name : Image_02012023163246227.png
|
2023-01-02 16:32:46.342126 |
372 |
59945573 |
Street light repair at Dhannyachora sansad |
95000 |
Street light repair at Dhannyachora sansad1 |
Roof laid |
-
latitude : 22.84908774
Longitude : 87.43463119
file name : Image_02012023163454507.png
|
2023-01-02 16:34:54.615991 |
373 |
59945573 |
Street light repair at Dhannyachora sansad |
95000 |
Street light repair at Dhannyachora sansad1 |
Completion of work |
-
latitude : 22.8490091
Longitude : 87.43461413
file name : Image_12112022152851675.png
|
2022-11-12 15:28:51.787519 |
374 |
59945573 |
Street light repair at Dhannyachora sansad |
95000 |
Street light repair at Dhannyachora sansad1 |
Completion of work |
-
latitude : 22.8490086
Longitude : 87.43460926
file name : Image_12112022152945742.png
|
2022-11-12 15:29:45.851839 |
375 |
59941860 |
Construction Of verandha & boundary wall at Madnahari 237 no ICDS |
336460 |
Construction Of verandha & boundary wall at Madnahari 237 no ICDS1 |
Roof laid |
-
latitude : 22.8603367
Longitude : 87.42288665
file name : Image_22032023152250110.png
|
2023-03-22 15:22:50.206515 |
376 |
59941860 |
Construction Of verandha & boundary wall at Madnahari 237 no ICDS |
336460 |
Construction Of verandha & boundary wall at Madnahari 237 no ICDS1 |
Plinth level |
-
latitude : 22.860385
Longitude : 87.42288924
file name : Image_19012023130816414.png
|
2023-01-19 13:08:16.531867 |
377 |
59941860 |
Construction Of verandha & boundary wall at Madnahari 237 no ICDS |
336460 |
Construction Of verandha & boundary wall at Madnahari 237 no ICDS1 |
Completion of work |
-
latitude : 22.86041666
Longitude : 87.42292457
file name : Image_12012023171910037.png
|
2023-01-12 17:19:10.122037 |
378 |
59974563 |
Construction Of Concrete Drain from Bhabani Garai House to Kachi Bag House at Uttar Madnahari |
237609 |
Construction Of Concrete Drain from Bhabani Garai House to Kachi Bag House at Uttar Madnahari1 |
Roof laid |
-
latitude : 22.86736654,22.86736654,22.8673618,22.8673618,22.8673618,22.8673618,22.8673618
Longitude : 87.40058239,87.40058239,87.40058132,87.40058132,87.40058132,87.40058132,87.40058132
file name : Image_11122022111832855.png
|
2022-12-11 11:18:32.953017 |
379 |
59974563 |
Construction Of Concrete Drain from Bhabani Garai House to Kachi Bag House at Uttar Madnahari |
237609 |
Construction Of Concrete Drain from Bhabani Garai House to Kachi Bag House at Uttar Madnahari1 |
Completion of work |
-
latitude : 22.86735568,22.86735568,22.86735568,22.86735568,22.86735593
Longitude : 87.40064609,87.40064609,87.40064609,87.40064609,87.4006495
file name : Image_08122022134248872.png
|
2022-12-08 13:42:48.998947 |
380 |
59974563 |
Construction Of Concrete Drain from Bhabani Garai House to Kachi Bag House at Uttar Madnahari |
237609 |
Construction Of Concrete Drain from Bhabani Garai House to Kachi Bag House at Uttar Madnahari1 |
Completion of work |
-
latitude : 22.86532634,22.86532634,22.86532634,22.86532634,22.86532634,22.86532634,22.86532634
Longitude : 87.34666159,87.34666159,87.34666159,87.34666159,87.34666159,87.34666159,87.34666159
file name : Image_08122022112430557.png
|
2022-12-08 11:24:30.653546 |
381 |
59984424 |
Installation of SubMarsibal pump Pipe Line Repiar Maiya Maitik House Lohar para at Uttar Madnahar |
151749 |
Installation of SubMarsibal pump Pipe Line Repiar Maiya Maitik House Lohar para at Uttar Madnahar1 |
Completion of work |
-
latitude : 22.86614293
Longitude : 87.40184557
file name : Image_31052023120804924.png
|
2023-05-31 12:08:05.029015 |
382 |
59984424 |
Installation of SubMarsibal pump Pipe Line Repiar Maiya Maitik House Lohar para at Uttar Madnahar |
151749 |
Installation of SubMarsibal pump Pipe Line Repiar Maiya Maitik House Lohar para at Uttar Madnahar1 |
Plinth level |
-
latitude : 22.86613275
Longitude : 87.40184185
file name : Image_31052023121138723.png
|
2023-05-31 12:11:38.817907 |
383 |
59984424 |
Installation of SubMarsibal pump Pipe Line Repiar Maiya Maitik House Lohar para at Uttar Madnahar |
151749 |
Installation of SubMarsibal pump Pipe Line Repiar Maiya Maitik House Lohar para at Uttar Madnahar1 |
Roof laid |
-
latitude : 22.86613207
Longitude : 87.40185507
file name : Image_31052023185242653.png
|
2023-05-31 18:52:42.730985 |
384 |
59976277 |
Construction Of Concrete Drain from Janda Pry. School to Chitta Samanta Shop at Malbandi |
200373 |
Construction Of Concrete Drain from Janda Pry. School to Chitta Samanta Shop at Malbandi1 |
Completion of work |
-
latitude : 22.85249899,22.85249899
Longitude : 87.46558714,87.46558714
file name : Image_20052023133331214.png
|
2023-05-20 13:33:31.310179 |
385 |
59976277 |
Construction Of Concrete Drain from Janda Pry. School to Chitta Samanta Shop at Malbandi |
200373 |
Construction Of Concrete Drain from Janda Pry. School to Chitta Samanta Shop at Malbandi1 |
Plinth level |
-
latitude : 22.8524936,22.8524936
Longitude : 87.46557734,87.46557734
file name : Image_20052023133607830.png
|
2023-05-20 13:36:07.921297 |
386 |
59976277 |
Construction Of Concrete Drain from Janda Pry. School to Chitta Samanta Shop at Malbandi |
200373 |
Construction Of Concrete Drain from Janda Pry. School to Chitta Samanta Shop at Malbandi1 |
Roof laid |
-
latitude : 22.85250545,22.85250504
Longitude : 87.46556023,87.46556579
file name : Image_20052023133759604.png
|
2023-05-20 13:37:59.69385 |
387 |
59938363 |
Construction Of Birajpur Pry. School Boundary at Birajpur |
155000 |
Construction Of Birajpur Pry. School Boundary at Birajpur1 |
Completion of work |
-
latitude : 22.83669302
Longitude : 87.4807966
file name : Image_02062023140201360.png
|
2023-06-02 14:02:01.450465 |
388 |
59938363 |
Construction Of Birajpur Pry. School Boundary at Birajpur |
155000 |
Construction Of Birajpur Pry. School Boundary at Birajpur1 |
Plinth level |
-
latitude : 22.83669582
Longitude : 87.48089643
file name : Image_02062023140632162.png
|
2023-06-02 14:06:32.255344 |
389 |
59938363 |
Construction Of Birajpur Pry. School Boundary at Birajpur |
155000 |
Construction Of Birajpur Pry. School Boundary at Birajpur1 |
Plinth level |
-
latitude : 22.83668636
Longitude : 87.48084483
file name : Image_02062023140715757.png
|
2023-06-02 14:07:15.845387 |
390 |
59938363 |
Construction Of Birajpur Pry. School Boundary at Birajpur |
155000 |
Construction Of Birajpur Pry. School Boundary at Birajpur1 |
Roof laid |
-
latitude : 22.83669075
Longitude : 87.48087718
file name : Image_02062023140901964.png
|
2023-06-02 14:09:02.056345 |
391 |
59994726 |
Installation of sub Marsibal pump with Tank near Jaganath Kotal House at Uttar Kharkusma |
151749 |
Installation of sub Marsibal pump with Tank near Jaganath Kotal House at Uttar Kharkusma1 |
Completion of work |
-
latitude : 22.84411962
Longitude : 87.36142239
file name : Image_07062023173325837.png
|
2023-06-07 17:33:25.922078 |
392 |
59994726 |
Installation of sub Marsibal pump with Tank near Jaganath Kotal House at Uttar Kharkusma |
151749 |
Installation of sub Marsibal pump with Tank near Jaganath Kotal House at Uttar Kharkusma1 |
Plinth level |
-
latitude : 22.86825662
Longitude : 87.4293324
file name : Image_07062023174007638.png
|
2023-06-07 17:40:07.723001 |
393 |
59994726 |
Installation of sub Marsibal pump with Tank near Jaganath Kotal House at Uttar Kharkusma |
151749 |
Installation of sub Marsibal pump with Tank near Jaganath Kotal House at Uttar Kharkusma1 |
Roof laid |
-
latitude : 22.86826531
Longitude : 87.42932224
file name : Image_07062023174125314.png
|
2023-06-07 17:41:25.400029 |
394 |
59994971 |
Installation of Sub Marsibal Pump Repiar Taldanga ICDS School at Taldanga |
151749 |
Installation of Sub Marsibal Pump Repiar Taldanga ICDS School at Taldanga1 |
Plinth level |
-
latitude : 22.861625
Longitude : 87.43237
file name : Image_07062023175423674.png
|
2023-06-07 17:54:23.767907 |
395 |
59994971 |
Installation of Sub Marsibal Pump Repiar Taldanga ICDS School at Taldanga |
151749 |
Installation of Sub Marsibal Pump Repiar Taldanga ICDS School at Taldanga1 |
Roof laid |
-
latitude : 22.86102911
Longitude : 87.43045521
file name : Image_07062023175552060.png
|
2023-06-07 17:55:52.148971 |
396 |
59994971 |
Installation of Sub Marsibal Pump Repiar Taldanga ICDS School at Taldanga |
151749 |
Installation of Sub Marsibal Pump Repiar Taldanga ICDS School at Taldanga1 |
Completion of work |
-
latitude : 22.86104691
Longitude : 87.43046282
file name : Image_05062023130417004.png
|
2023-06-05 13:04:17.109931 |
397 |
59939154 |
Installation & repair Of Street light near taldanga Kabarstan gate at Taldanga |
100000 |
Installation & repair Of Street light near taldanga Kabarstan gate at Taldanga1 |
Completion of work |
-
latitude : 22.86076313
Longitude : 87.43182788
file name : Image_17062023114323806.png
|
2023-06-17 11:43:23.891414 |
398 |
59939154 |
Installation & repair Of Street light near taldanga Kabarstan gate at Taldanga |
100000 |
Installation & repair Of Street light near taldanga Kabarstan gate at Taldanga1 |
Plinth level |
-
latitude : 22.8606578
Longitude : 87.43173147
file name : Image_17062023114713192.png
|
2023-06-17 11:47:13.279303 |
399 |
59939154 |
Installation & repair Of Street light near taldanga Kabarstan gate at Taldanga |
100000 |
Installation & repair Of Street light near taldanga Kabarstan gate at Taldanga1 |
Roof laid |
-
latitude : 22.86065727
Longitude : 87.43172658
file name : Image_17062023114844000.png
|
2023-06-17 11:48:44.082269 |
400 |
59939666 |
Construction Of Concrete road from Chirma adibashi para gramin road at Pursusha |
216424 |
Construction Of Concrete road from Chirma adibashi para gramin road at Pursusha 1 |
Completion of work |
-
latitude : 22.84379164,22.84379164
Longitude : 87.41883042,87.41883042
file name : Image_20052023120532296.png
|
2023-05-20 12:05:32.39763 |
401 |
59939666 |
Construction Of Concrete road from Chirma adibashi para gramin road at Pursusha |
216424 |
Construction Of Concrete road from Chirma adibashi para gramin road at Pursusha 1 |
Plinth level |
-
latitude : 22.84377955,22.84377955
Longitude : 87.41881983,87.41881983
file name : Image_20052023121146958.png
|
2023-05-20 12:11:47.057454 |
402 |
59939666 |
Construction Of Concrete road from Chirma adibashi para gramin road at Pursusha |
216424 |
Construction Of Concrete road from Chirma adibashi para gramin road at Pursusha 1 |
Roof laid |
-
latitude : 22.84373489,22.84382223
Longitude : 87.41874306,87.41890952
file name : Image_20052023130507187.png
|
2023-05-20 13:05:07.295594 |
403 |
49027172 |
Rahaman Khan House to Samad khan House drain at Pursusha |
160486 |
Rahaman Khan House to Samad khan House drain at Pursusha1 |
Roof laid |
-
latitude : 22.84473643
Longitude : 87.41869101
file name : Image_22032023153103442.png
|
2023-03-22 15:31:03.538851 |
404 |
49027172 |
Rahaman Khan House to Samad khan House drain at Pursusha |
160486 |
Rahaman Khan House to Samad khan House drain at Pursusha1 |
Completion of work |
-
latitude : 22.84445176
Longitude : 87.41839741
file name : Image_10032023150627812.png
|
2023-03-10 15:06:27.896959 |
405 |
49027172 |
Rahaman Khan House to Samad khan House drain at Pursusha |
160486 |
Rahaman Khan House to Samad khan House drain at Pursusha1 |
Plinth level |
-
latitude : 22.84442663
Longitude : 87.41841186
file name : Image_10032023150904795.png
|
2023-03-10 15:09:04.893735 |
406 |
67649572 |
Procurement of Computer |
200000 |
Procurement of Computer1 |
|
-
latitude : 22.8540062
Longitude : 87.4305654
file name : Image_13122023161442520.png
|
2023-12-13 16:14:42.61173 |
407 |
59950089 |
Computer Repair G. P Office |
195000 |
Computer Repair G. P Office3 |
Completion of work |
-
latitude : 22.8540071
Longitude : 87.4305774
file name : Image_30062022183419220.png
|
2022-06-30 18:34:19.336226 |
408 |
59950089 |
Computer Repair G. P Office |
195000 |
Computer Repair G. P Office3 |
Completion of work |
-
latitude : 22.8540071
Longitude : 87.4305774
file name : Image_30062022183427967.png
|
2022-06-30 18:34:28.069685 |
409 |
59950089 |
Computer Repair G. P Office |
195000 |
Computer Repair G. P Office4 |
Completion of work |
-
latitude : 22.8540076
Longitude : 87.4305755
file name : Image_30062022183422060.png
|
2022-06-30 18:34:22.162543 |
410 |
59950089 |
Computer Repair G. P Office |
195000 |
Computer Repair G. P Office4 |
Completion of work |
-
latitude : 22.8540076
Longitude : 87.4305755
file name : Image_30062022183430771.png
|
2022-06-30 18:34:30.87421 |
411 |
67578389 |
Drinking water facility |
250000 |
Drinking water facility1 |
|
-
latitude : 22.84265471
Longitude : 87.47637241
file name : Image_20122023154422962.png
|
2023-12-20 15:44:23.072811 |
412 |
67578389 |
Drinking water facility |
250000 |
Drinking water facility1 |
|
-
latitude : 22.84264776
Longitude : 87.47632855
file name : Image_20122023154210032.png
|
2023-12-20 15:42:10.133823 |
413 |
67579759 |
Construction of roads |
249836 |
Construction of roads1 |
Roof laid |
-
latitude : 22.8504481,22.8504481
Longitude : 87.4661466,87.4661466
file name : Image_20122023160009949.png
|
2023-12-20 16:00:10.06865 |
414 |
67579759 |
Construction of roads |
249836 |
Construction of roads1 |
Plinth level |
-
latitude : 22.85066966,22.85066968
Longitude : 87.46583346,87.46583346
file name : Image_20122023155750120.png
|
2023-12-20 15:57:50.210453 |
415 |
67579759 |
Construction of roads |
249836 |
Construction of roads1 |
Completion of work |
-
latitude : 22.8504523,22.8504523
Longitude : 87.4661463,87.4661463
file name : Image_20122023155545265.png
|
2023-12-20 15:55:45.355033 |
416 |
67578580 |
Construction of Water treatment plant |
249530 |
Construction of Water treatment plant1 |
|
-
latitude : 22.86118755
Longitude : 87.43362453
file name : Image_20122023162333336.png
|
2023-12-20 16:23:33.432609 |
417 |
67578580 |
Construction of Water treatment plant |
249530 |
Construction of Water treatment plant1 |
|
-
latitude : 22.86119638
Longitude : 87.43366537
file name : Image_20122023161957090.png
|
2023-12-20 16:19:57.22045 |
418 |
46747225 |
Construction of concret drain from Amit Dutta house to bakui at Monglapota |
160486 |
Construction of concret drain from Amit Dutta house to bakui at Monglapota1 |
Plinth level |
-
latitude : 22.86911953
Longitude : 87.41678236
file name : Image_02052023160629854.png
|
2023-05-02 16:06:29.970115 |
419 |
46747225 |
Construction of concret drain from Amit Dutta house to bakui at Monglapota |
160486 |
Construction of concret drain from Amit Dutta house to bakui at Monglapota1 |
Roof laid |
-
latitude : 22.86916688
Longitude : 87.4164855
file name : Image_02052023160740982.png
|
2023-05-02 16:07:41.082614 |
420 |
46747225 |
Construction of concret drain from Amit Dutta house to bakui at Monglapota |
160486 |
Construction of concret drain from Amit Dutta house to bakui at Monglapota1 |
Completion of work |
-
latitude : 22.86910793
Longitude : 87.41681182
file name : Image_02042023125801104.png
|
2023-04-02 12:58:01.198199 |
421 |
49025397 |
Installation of sumarsale Pump with pipe line Near g.p Office Market complex |
144357 |
Installation of sumarsale Pump with pipe line Near g.p Office Market complex1 |
Plinth level |
-
latitude : 22.8539776
Longitude : 87.4304754
file name : Image_02042023140105690.png
|
2023-04-02 14:01:05.778992 |
422 |
49025397 |
Installation of sumarsale Pump with pipe line Near g.p Office Market complex |
144357 |
Installation of sumarsale Pump with pipe line Near g.p Office Market complex1 |
Roof laid |
-
latitude : 22.8539746
Longitude : 87.4304693
file name : Image_02042023140336565.png
|
2023-04-02 14:03:36.651592 |
423 |
49025397 |
Installation of sumarsale Pump with pipe line Near g.p Office Market complex |
144357 |
Installation of sumarsale Pump with pipe line Near g.p Office Market complex1 |
Completion of work |
-
latitude : 22.8541167
Longitude : 87.4304154
file name : Image_10032023165035274.png
|
2023-03-10 16:50:35.359597 |
424 |
59949457 |
Xerax Repair & Paper |
181180 |
Xerax Repair & Paper1 |
Roof laid |
-
latitude : 22.8539602
Longitude : 87.4305828
file name : Image_28092022150809981.png
|
2022-09-28 15:08:10.073659 |
425 |
59949457 |
Xerax Repair & Paper |
181180 |
Xerax Repair & Paper1 |
Plinth level |
-
latitude : 22.8539611
Longitude : 87.4305808
file name : Image_28092022150555349.png
|
2022-09-28 15:05:55.421563 |
426 |
59949457 |
Xerax Repair & Paper |
181180 |
Xerax Repair & Paper1 |
Completion of work |
-
latitude : 22.8539602
Longitude : 87.4305806
file name : Image_28092022150344942.png
|
2022-09-28 15:03:44.993874 |
427 |
66828703 |
Contingency and others |
350000 |
Contingency and others1 |
Completion of work |
-
latitude : 22.853979
Longitude : 87.4305472
file name : Image_10022023163038759.png
|
2023-02-10 16:30:38.844827 |
428 |
66828703 |
Contingency and others |
350000 |
Contingency and others1 |
Plinth level |
-
latitude : 22.8539803
Longitude : 87.4305618
file name : Image_10022023163147767.png
|
2023-02-10 16:31:47.85253 |
429 |
66828703 |
Contingency and others |
350000 |
Contingency and others1 |
Roof laid |
-
latitude : 22.8539799
Longitude : 87.4305604
file name : Image_10022023163252611.png
|
2023-02-10 16:32:52.694845 |
430 |
67094562 |
Water Supply to villages |
169475 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.84800432
Longitude : 87.4223567
file name : Image_20042023130753268.png
|
2023-04-20 13:07:53.393775 |
431 |
67094562 |
Water Supply to villages |
169475 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.84814171
Longitude : 87.42235602
file name : Image_20042023131325008.png
|
2023-04-20 13:13:25.114229 |
432 |
67094562 |
Water Supply to villages |
169475 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.84812794
Longitude : 87.42237719
file name : Image_20042023131539918.png
|
2023-04-20 13:15:40.018213 |
433 |
67463916 |
Drinking water facilities |
150000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 22.86380337,22.86380337
Longitude : 87.42327416,87.42327416
file name : Image_26122023135446905.png
|
2023-12-26 13:54:47.000941 |
434 |
67463916 |
Drinking water facilities |
150000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 22.8637163,22.8637163
Longitude : 87.4232224,87.4232224
file name : Image_26122023135254634.png
|
2023-12-26 13:52:54.732318 |
435 |
67463916 |
Drinking water facilities |
150000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 22.86376449,22.86376453
Longitude : 87.42318905,87.42318908
file name : Image_26122023135052145.png
|
2023-12-26 13:50:52.240456 |
436 |
67467358 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.86918817
Longitude : 87.41629708
file name : Image_26122023134145426.png
|
2023-12-26 13:41:45.512789 |
437 |
67467358 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.8691687
Longitude : 87.41638236
file name : Image_26122023133933807.png
|
2023-12-26 13:39:33.88863 |
438 |
67467358 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.8657075
Longitude : 87.4217402
file name : Image_26122023133601510.png
|
2023-12-26 13:36:01.598374 |
439 |
67467358 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.8657075
Longitude : 87.4217402
file name : Image_26122023133247201.png
|
2023-12-26 13:32:47.30314 |
440 |
67577515 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Plinth level |
-
latitude : 22.84391009
Longitude : 87.42018988
file name : Image_28032024143247506.png
|
2024-03-28 14:32:47.600747 |
441 |
67577515 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Completion of work |
-
latitude : 22.8439288
Longitude : 87.42006813
file name : Image_28032024142932425.png
|
2024-03-28 14:29:32.517767 |
442 |
89919714 |
Drinking water facility |
100000 |
Drinking water facility1 |
Roof laid |
-
latitude : 22.8540081
Longitude : 87.4305254
file name : Image_13082024145518426.png
|
2024-08-13 14:55:18.527192 |
443 |
89919714 |
Drinking water facility |
100000 |
Drinking water facility1 |
Roof laid |
-
latitude : 22.8540081
Longitude : 87.4305254
file name : Image_13082024144910403.png
|
2024-08-13 14:49:10.507188 |
444 |
89919714 |
Drinking water facility |
100000 |
Drinking water facility1 |
Plinth level |
-
latitude : 22.8540034
Longitude : 87.4305269
file name : Image_13082024144740614.png
|
2024-08-13 14:47:40.708778 |
445 |
89919714 |
Drinking water facility |
100000 |
Drinking water facility1 |
Completion of work |
-
latitude : 22.8540029
Longitude : 87.4305293
file name : Image_13082024144459537.png
|
2024-08-13 14:44:59.632879 |
446 |
67878379 |
Drainage Construction |
61128 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.8640087
Longitude : 87.42598154
file name : Image_13062024125644622.png
|
2024-06-13 12:56:44.726134 |
447 |
67878379 |
Drainage Construction |
61128 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.86399686
Longitude : 87.42599889
file name : Image_13062024125240144.png
|
2024-06-13 12:52:40.236221 |
448 |
67878379 |
Drainage Construction |
61128 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.86455091
Longitude : 87.35970445
file name : Image_13062024124148065.png
|
2024-06-13 12:41:48.154125 |
449 |
67879391 |
Construction of roads |
300000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.83880578,22.83880578
Longitude : 87.42859883,87.42859883
file name : Image_12062024144342572.png
|
2024-06-12 14:43:42.67474 |
450 |
67879391 |
Construction of roads |
300000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.83877504,22.83877504,22.83877504
Longitude : 87.42858868,87.42858868,87.42858868
file name : Image_12062024144106451.png
|
2024-06-12 14:41:06.55658 |
451 |
67879391 |
Construction of roads |
300000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.86979393,22.86979393
Longitude : 87.34732338,87.34732338
file name : Image_12062024142946351.png
|
2024-06-12 14:29:46.455731 |
452 |
67618166 |
Construction of Boundary Wall |
240307 |
Construction of Boundary Wall1 |
Roof laid |
-
latitude : 22.83021911
Longitude : 87.47190212
file name : Image_12082024150107830.png
|
2024-08-12 15:01:07.931877 |
453 |
67618166 |
Construction of Boundary Wall |
240307 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 22.83023664
Longitude : 87.47190188
file name : Image_12082024145823862.png
|
2024-08-12 14:58:23.964799 |
454 |
67618166 |
Construction of Boundary Wall |
240307 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 22.83021231
Longitude : 87.47190578
file name : Image_12082024145455758.png
|
2024-08-12 14:54:55.846129 |
455 |
67619035 |
Drinking water facility |
250000 |
Drinking water facility1 |
|
-
latitude : 22.8656997
Longitude : 87.4217622
file name : Image_12062024180720717.png
|
2024-06-12 18:07:20.810582 |
456 |
67578797 |
Construction of Water treatment plant |
250000 |
Construction of Water treatment plant1 |
|
-
latitude : 22.85969433
Longitude : 87.44435488
file name : Image_23062024170007938.png
|
2024-06-23 17:00:08.033881 |
457 |
89918248 |
Drinking water facility |
115416 |
Drinking water facility1 |
|
-
latitude : 22.854115
Longitude : 87.4303577
file name : Image_13062024152430315.png
|
2024-06-13 15:24:30.446274 |
458 |
89915471 |
Drinking water facility |
201060 |
Drinking water facility1 |
|
-
latitude : 22.8539989
Longitude : 87.4305363
file name : Image_20062024145609744.png
|
2024-06-20 14:56:09.830257 |
459 |
67622996 |
Drinking water facility |
232500 |
Drinking water facility1 |
|
-
latitude : 22.8573379
Longitude : 87.43126465
file name : Image_23062024173036928.png
|
2024-06-23 17:30:37.020071 |
460 |
89914643 |
Drinking water facility |
200000 |
Drinking water facility1 |
|
-
latitude : 22.86652006
Longitude : 87.42014753
file name : Image_12062024181652670.png
|
2024-06-12 18:16:52.756295 |
461 |
89918793 |
Repair of drainage channel |
250000 |
Repair of drainage channel1 |
Roof laid |
-
latitude : 22.83710392
Longitude : 87.48079283
file name : Image_30072024074808244.png
|
2024-07-30 07:48:08.342379 |
462 |
89918793 |
Repair of drainage channel |
250000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 22.83708869
Longitude : 87.48080753
file name : Image_30072024074556400.png
|
2024-07-30 07:45:56.494959 |
463 |
89918793 |
Repair of drainage channel |
250000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 22.8371348
Longitude : 87.48079832
file name : Image_30072024074400313.png
|
2024-07-30 07:44:00.416433 |
464 |
89919623 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.83550958
Longitude : 87.43896141
file name : Image_10072024142611805.png
|
2024-07-10 14:26:12.018912 |
465 |
89919623 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.83548917
Longitude : 87.43894528
file name : Image_10072024141621604.png
|
2024-07-10 14:16:21.694289 |
466 |
89919623 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.83551769
Longitude : 87.43893052
file name : Image_10072024141312001.png
|
2024-07-10 14:13:12.08179 |
467 |
89909254 |
Drainage Construction |
350000 |
Drainage Construction1 |
|
-
latitude : 22.86606511
Longitude : 87.42685677
file name : Image_13062024131205719.png
|
2024-06-13 13:12:05.824672 |
468 |
67618729 |
Boundary wall and Gate |
200000 |
Boundary wall and Gate1 |
Roof laid |
-
latitude : 22.85743051
Longitude : 87.43134244
file name : Image_30122023172124077.png
|
2023-12-30 17:21:24.160574 |
469 |
67618729 |
Boundary wall and Gate |
200000 |
Boundary wall and Gate1 |
Plinth level |
-
latitude : 22.85742731
Longitude : 87.43131861
file name : Image_30122023171939646.png
|
2023-12-30 17:19:39.732083 |
470 |
67618729 |
Boundary wall and Gate |
200000 |
Boundary wall and Gate1 |
Completion of work |
-
latitude : 22.85737722
Longitude : 87.43130318
file name : Image_30122023171752057.png
|
2023-12-30 17:17:52.140916 |
471 |
67647417 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Roof laid |
-
latitude : 22.8674014
Longitude : 87.4282795
file name : Image_12072024164223274.png
|
2024-07-12 16:42:23.423478 |
472 |
67647417 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Plinth level |
-
latitude : 22.8673987
Longitude : 87.428305
file name : Image_12072024163957421.png
|
2024-07-12 16:39:57.532076 |
473 |
67647417 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Completion of work |
-
latitude : 22.86728733
Longitude : 87.42829533
file name : Image_12072024161700739.png
|
2024-07-12 16:17:00.85006 |
474 |
67465458 |
Electricity connection /Installation of Solar Energy |
100000 |
Electricity connection /Installation of Solar Energy1 |
Roof laid |
-
latitude : 22.86755466
Longitude : 87.42668374
file name : Image_12072024163822113.png
|
2024-07-12 16:38:22.256537 |
475 |
67465458 |
Electricity connection /Installation of Solar Energy |
100000 |
Electricity connection /Installation of Solar Energy1 |
Plinth level |
-
latitude : 22.86755665
Longitude : 87.42667687
file name : Image_12072024163631259.png
|
2024-07-12 16:36:31.396691 |
476 |
67465458 |
Electricity connection /Installation of Solar Energy |
100000 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 22.8673391
Longitude : 87.4270726
file name : Image_12072024163416589.png
|
2024-07-12 16:34:16.724265 |
477 |
90725219 |
Pipeline connection for water supply |
80775 |
Pipeline connection for water supply1 |
Roof laid |
-
latitude : 22.8693614
Longitude : 87.4182216
file name : Image_12072024162943046.png
|
2024-07-12 16:29:43.15477 |
478 |
90725219 |
Pipeline connection for water supply |
80775 |
Pipeline connection for water supply1 |
Plinth level |
-
latitude : 22.86907133
Longitude : 87.41798836
file name : Image_12072024162810941.png
|
2024-07-12 16:28:11.028108 |
479 |
90725219 |
Pipeline connection for water supply |
80775 |
Pipeline connection for water supply1 |
Completion of work |
-
latitude : 22.8690928
Longitude : 87.4183629
file name : Image_12072024162634513.png
|
2024-07-12 16:26:34.601176 |
480 |
90969937 |
Drinking water facilities/ Installation of RO/ Water Filter |
259649 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
|
-
latitude : 22.85563655
Longitude : 87.42902298
file name : Image_05112024125300325.png
|
2024-11-05 12:53:00.423239 |
481 |
90969937 |
Drinking water facilities/ Installation of RO/ Water Filter |
259649 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
|
-
latitude : 22.85566482
Longitude : 87.42901889
file name : Image_05112024124602092.png
|
2024-11-05 12:46:02.18607 |
482 |
90969937 |
Drinking water facilities/ Installation of RO/ Water Filter |
259649 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
|
-
latitude : 22.85572328
Longitude : 87.42905083
file name : Image_24102024134840211.png
|
2024-10-24 13:48:40.310036 |
483 |
90978542 |
Pipeline connection for water supply |
50350 |
Pipeline connection for water supply1 |
Roof laid |
-
latitude : 22.85759045
Longitude : 87.43479096
file name : Image_05112024124146761.png
|
2024-11-05 12:41:46.849849 |
484 |
90978542 |
Pipeline connection for water supply |
50350 |
Pipeline connection for water supply1 |
Roof laid |
-
latitude : 22.85761533
Longitude : 87.43477926
file name : Image_05112024123908093.png
|
2024-11-05 12:39:08.181463 |
485 |
90978542 |
Pipeline connection for water supply |
50350 |
Pipeline connection for water supply1 |
Plinth level |
-
latitude : 22.8540107
Longitude : 87.430614
file name : Image_28102024142053651.png
|
2024-10-28 14:20:53.76079 |
486 |
90978542 |
Pipeline connection for water supply |
50350 |
Pipeline connection for water supply1 |
Completion of work |
-
latitude : 22.8540096
Longitude : 87.4306261
file name : Image_28102024141910700.png
|
2024-10-28 14:19:10.904371 |
487 |
90978542 |
Pipeline connection for water supply |
50350 |
Pipeline connection for water supply1 |
Completion of work |
-
latitude : 22.8577004
Longitude : 87.4347677
file name : Image_24102024143503984.png
|
2024-10-24 14:35:04.080011 |
488 |
90721793 |
Drinking water facilities/ Installation of RO/ Water Filter |
199479 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
Roof laid |
-
latitude : 22.85255451
Longitude : 87.4760506
file name : Image_11112024132412362.png
|
2024-11-11 13:24:12.456333 |
489 |
90721793 |
Drinking water facilities/ Installation of RO/ Water Filter |
199479 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
Plinth level |
-
latitude : 22.85265476
Longitude : 87.47599229
file name : Image_11112024131152335.png
|
2024-11-11 13:11:52.428996 |
490 |
90721793 |
Drinking water facilities/ Installation of RO/ Water Filter |
199479 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
Completion of work |
-
latitude : 22.85244472
Longitude : 87.47586948
file name : Image_24102024132157721.png
|
2024-10-24 13:21:57.8363 |
491 |
97839006 |
Construction of roads |
343766 |
Construction of roads1 |
Roof laid |
-
latitude : 22.82911284,22.82911284
Longitude : 87.45046394,87.45046394
file name : Image_22112024121642780.png
|
2024-11-22 12:16:42.876944 |
492 |
97839006 |
Construction of roads |
343766 |
Construction of roads1 |
Plinth level |
-
latitude : 22.82909927,22.82909927
Longitude : 87.45049439,87.45049439
file name : Image_19112024120926800.png
|
2024-11-19 12:09:26.90989 |
493 |
97839006 |
Construction of roads |
343766 |
Construction of roads1 |
Completion of work |
-
latitude : 22.82894698,22.82894856
Longitude : 87.45122664,87.4512256
file name : Image_24102024133723127.png
|
2024-10-24 13:37:23.227021 |
494 |
90920983 |
Drainage Construction |
349750 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.8648943
Longitude : 87.4274133
file name : Image_10122024140600534.png
|
2024-12-10 14:06:00.61575 |
495 |
90920983 |
Drainage Construction |
349750 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.8648844
Longitude : 87.4267936
file name : Image_05112024123211217.png
|
2024-11-05 12:32:11.314952 |
496 |
90920983 |
Drainage Construction |
349750 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.8656485
Longitude : 87.4280329
file name : Image_24102024135958995.png
|
2024-10-24 13:59:59.09825 |
497 |
98030791 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure |
145662 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure1 |
Roof laid |
-
latitude : 22.86809119
Longitude : 87.41757096
file name : Image_05112024122536252.png
|
2024-11-05 12:25:36.353996 |
498 |
98030791 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure |
145662 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure1 |
Plinth level |
-
latitude : 22.86803167
Longitude : 87.4175552
file name : Image_05112024122324507.png
|
2024-11-05 12:23:24.615996 |
499 |
98030791 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure |
145662 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure1 |
Completion of work |
-
latitude : 22.86810222
Longitude : 87.41757185
file name : Image_24102024141435805.png
|
2024-10-24 14:14:35.921564 |
500 |
90910853 |
Drainage Construction |
349242 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.8671618
Longitude : 87.4295819
file name : Image_10122024135551128.png
|
2024-12-10 13:55:51.217472 |
501 |
90910853 |
Drainage Construction |
349242 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.86396422
Longitude : 87.42858959
file name : Image_10122024135312127.png
|
2024-12-10 13:53:12.219666 |
502 |
90910853 |
Drainage Construction |
349242 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.86397657
Longitude : 87.42858019
file name : Image_10122024135041061.png
|
2024-12-10 13:50:41.155488 |
503 |
90979096 |
Drainage Construction |
52742 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.86588222
Longitude : 87.42968522
file name : Image_05112024121246894.png
|
2024-11-05 12:12:47.018184 |
504 |
90979096 |
Drainage Construction |
52742 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.8725654
Longitude : 87.34811169
file name : Image_05112024120926990.png
|
2024-11-05 12:09:27.083068 |
505 |
90979096 |
Drainage Construction |
52742 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.86606546
Longitude : 87.42926336
file name : Image_24102024135823921.png
|
2024-10-24 13:58:24.013038 |
506 |
91079477 |
Maintenance of Street Lights |
125239 |
Maintenance of Street Lights1 |
Roof laid |
-
latitude : 22.86219792
Longitude : 87.43221748
file name : Image_12112024121641807.png
|
2024-11-12 12:16:41.908805 |
507 |
91079477 |
Maintenance of Street Lights |
125239 |
Maintenance of Street Lights1 |
Plinth level |
-
latitude : 22.8726167
Longitude : 87.34815999
file name : Image_12112024120221849.png
|
2024-11-12 12:02:21.937807 |
508 |
91079477 |
Maintenance of Street Lights |
125239 |
Maintenance of Street Lights1 |
Completion of work |
-
latitude : 22.8596205
Longitude : 87.4313835
file name : Image_11112024122934887.png
|
2024-11-11 12:29:34.985135 |
509 |
98032624 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure |
348127 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure1 |
Roof laid |
-
latitude : 22.8542067
Longitude : 87.42980245
file name : Image_10122024163813398.png
|
2024-12-10 16:38:13.501338 |
510 |
98032624 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure |
348127 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure1 |
Plinth level |
-
latitude : 22.8552094
Longitude : 87.430337
file name : Image_10122024163547537.png
|
2024-12-10 16:35:47.637992 |
511 |
98032624 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure |
348127 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure1 |
Completion of work |
-
latitude : 22.8540898
Longitude : 87.4304494
file name : Image_24102024144032640.png
|
2024-10-24 14:40:32.750779 |
512 |
90982928 |
Installation of Street Lights |
100000 |
Installation of Street Lights1 |
|
-
latitude : 22.8666456
Longitude : 87.4242466
file name : Image_19112024135337523.png
|
2024-11-19 13:53:37.665161 |
513 |
90982928 |
Installation of Street Lights |
100000 |
Installation of Street Lights1 |
|
-
latitude : 22.8661454
Longitude : 87.4235314
file name : Image_24102024141936204.png
|
2024-10-24 14:19:36.296253 |
514 |
91056187 |
Procurement of Computer Printer, UPS, etc. |
500000 |
Procurement of Computer Printer, UPS, etc.1 |
Roof laid |
-
latitude : 22.8539813
Longitude : 87.4306019
file name : Image_22082024122205300.png
|
2024-08-22 12:22:05.211163 |
515 |
91056187 |
Procurement of Computer Printer, UPS, etc. |
500000 |
Procurement of Computer Printer, UPS, etc.1 |
Plinth level |
-
latitude : 22.8539779
Longitude : 87.4305768
file name : Image_21082024163136304.png
|
2024-08-21 16:31:36.410719 |
516 |
91056187 |
Procurement of Computer Printer, UPS, etc. |
500000 |
Procurement of Computer Printer, UPS, etc.1 |
Completion of work |
-
latitude : 22.8539616
Longitude : 87.4305813
file name : Image_21082024153459078.png
|
2024-08-21 15:34:59.234253 |
517 |
90972529 |
Pipeline connection for water supply |
40000 |
Pipeline connection for water supply1 |
Roof laid |
-
latitude : 22.8549706
Longitude : 87.4299794
file name : Image_28102024144643894.png
|
2024-10-28 14:46:43.987565 |
518 |
90972529 |
Pipeline connection for water supply |
40000 |
Pipeline connection for water supply1 |
Plinth level |
-
latitude : 22.854969
Longitude : 87.4299768
file name : Image_28102024144336110.png
|
2024-10-28 14:43:36.191168 |
519 |
90972529 |
Pipeline connection for water supply |
40000 |
Pipeline connection for water supply1 |
Completion of work |
-
latitude : 22.8540064
Longitude : 87.4306156
file name : Image_28102024143324263.png
|
2024-10-28 14:33:24.347972 |
520 |
106554177 |
Electricity connection /Installation of Solar Energy |
100000 |
Electricity connection /Installation of Solar Energy1 |
Roof laid |
-
latitude : 22.8541402
Longitude : 87.4298523
file name : Image_30102024122612156.png
|
2024-10-30 12:26:12.244643 |
521 |
106554177 |
Electricity connection /Installation of Solar Energy |
100000 |
Electricity connection /Installation of Solar Energy1 |
Plinth level |
-
latitude : 22.8541533
Longitude : 87.4298434
file name : Image_30102024122320489.png
|
2024-10-30 12:23:20.61402 |
522 |
106554177 |
Electricity connection /Installation of Solar Energy |
100000 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 22.8539999
Longitude : 87.4305967
file name : Image_30102024122016349.png
|
2024-10-30 12:20:16.440727 |
523 |
67636542 |
Procurement of Waste Disposal Units |
400000 |
Procurement of Waste Disposal Units1 |
Plinth level |
-
latitude : 22.8539766
Longitude : 87.4305685
file name : Image_17102023164018107.png
|
2023-10-17 16:40:18.194039 |
524 |
67636542 |
Procurement of Waste Disposal Units |
400000 |
Procurement of Waste Disposal Units1 |
Completion of work |
-
latitude : 22.8539774
Longitude : 87.4305716
file name : Image_17102023162207627.png
|
2023-10-17 16:22:07.713177 |