1 |
35068242 |
PIPE LINE NEAR ABHA SING HOUSE AT RAMNAGAR |
49699 |
PIPE LINE NEAR ABHA SING HOUSE AT RAMNAGAR1 |
Roof laid |
-
latitude : 22.42833026,22.42831811,22.42831247
Longitude : 87.48247081,87.48247556,87.48248066
file name : Image_07072021105012560.png
|
2021-07-07 10:50:12.672405 |
2 |
35068242 |
PIPE LINE NEAR ABHA SING HOUSE AT RAMNAGAR |
49699 |
PIPE LINE NEAR ABHA SING HOUSE AT RAMNAGAR1 |
Plinth level |
-
latitude : 22.42836726,22.42835732,22.42834369
Longitude : 87.48246502,87.48246297,87.4824625
file name : Image_07072021104723516.png
|
2021-07-07 10:47:23.634658 |
3 |
35068242 |
PIPE LINE NEAR ABHA SING HOUSE AT RAMNAGAR |
49699 |
PIPE LINE NEAR ABHA SING HOUSE AT RAMNAGAR1 |
Completion of work |
-
latitude : 22.42832081,22.42831491,22.42830714
Longitude : 87.482444,87.48241213,87.48239746
file name : Image_07072021094915557.png
|
2021-07-07 09:49:15.666066 |
4 |
56347479 |
INSTALLATION OF SUBMERSIBLE PUMP WITH PIPELINE BESIDE GOPALPUR RAHIMUDDIN KHAN HOUSE |
200837 |
INSTALLATION OF SUBMERSIBLE PUMP WITH PIPELINE BESIDE GOPALPUR RAHIMUDDIN KHAN HOUSE1 |
Roof laid |
-
latitude : 22.4077182
Longitude : 87.44592752
file name : Image_16102023103819318.png
|
2023-10-16 10:38:19.410586 |
5 |
56347479 |
INSTALLATION OF SUBMERSIBLE PUMP WITH PIPELINE BESIDE GOPALPUR RAHIMUDDIN KHAN HOUSE |
200837 |
INSTALLATION OF SUBMERSIBLE PUMP WITH PIPELINE BESIDE GOPALPUR RAHIMUDDIN KHAN HOUSE1 |
Plinth level |
-
latitude : 22.40772372
Longitude : 87.44595527
file name : Image_16102023103522818.png
|
2023-10-16 10:35:22.908441 |
6 |
56347479 |
INSTALLATION OF SUBMERSIBLE PUMP WITH PIPELINE BESIDE GOPALPUR RAHIMUDDIN KHAN HOUSE |
200837 |
INSTALLATION OF SUBMERSIBLE PUMP WITH PIPELINE BESIDE GOPALPUR RAHIMUDDIN KHAN HOUSE1 |
Completion of work |
-
latitude : 22.40770015
Longitude : 87.44593111
file name : Image_16102023102930476.png
|
2023-10-16 10:29:30.595592 |
7 |
56347479 |
INSTALLATION OF SUBMERSIBLE PUMP WITH PIPELINE BESIDE GOPALPUR RAHIMUDDIN KHAN HOUSE |
200837 |
INSTALLATION OF SUBMERSIBLE PUMP WITH PIPELINE BESIDE GOPALPUR RAHIMUDDIN KHAN HOUSE1 |
Completion of work |
-
latitude : 22.40770015
Longitude : 87.44593111
file name : Image_16102023102924388.png
|
2023-10-16 10:29:24.478111 |
8 |
35473437 |
INSTALLATION OF SUBMERSIBLE PUMP WITH PIPE LINE AT DAKSHIN DHEKIA BAGAN PARA AT DAKSHIN DHEKIA |
164500 |
INSTALLATION OF SUBMERSIBLE PUMP WITH PIPE LINE AT DAKSHIN DHEKIA BAGAN PARA AT DAKSHIN DHEKIA 1 |
Roof laid |
-
latitude : 22.38874962
Longitude : 87.43831407
file name : Image_05042022155137382.png
|
2022-04-05 15:51:37.500297 |
9 |
35473437 |
INSTALLATION OF SUBMERSIBLE PUMP WITH PIPE LINE AT DAKSHIN DHEKIA BAGAN PARA AT DAKSHIN DHEKIA |
164500 |
INSTALLATION OF SUBMERSIBLE PUMP WITH PIPE LINE AT DAKSHIN DHEKIA BAGAN PARA AT DAKSHIN DHEKIA 1 |
Plinth level |
-
latitude : 22.3887118
Longitude : 87.43828978
file name : Image_25012022095304746.png
|
2022-01-25 09:53:04.866762 |
10 |
35473437 |
INSTALLATION OF SUBMERSIBLE PUMP WITH PIPE LINE AT DAKSHIN DHEKIA BAGAN PARA AT DAKSHIN DHEKIA |
164500 |
INSTALLATION OF SUBMERSIBLE PUMP WITH PIPE LINE AT DAKSHIN DHEKIA BAGAN PARA AT DAKSHIN DHEKIA 1 |
Completion of work |
-
latitude : 22.38871798
Longitude : 87.43831327
file name : Image_25012022094839334.png
|
2022-01-25 09:48:39.47028 |
11 |
46783631 |
CONSTRUCTION OF CONCRETE ROAD FROM MAIN ROAD TO DILJAN ALI HOUSE |
349300 |
CONSTRUCTION OF CONCRETE ROAD FROM MAIN ROAD TO DILJAN ALI HOUSE1 |
Completion of work |
-
latitude : 22.38462987,22.38463299,22.38463292
Longitude : 87.45732193,87.45732262,87.457319
file name : Image_18022022175341166.png
|
2022-02-18 17:53:41.272046 |
12 |
46783631 |
CONSTRUCTION OF CONCRETE ROAD FROM MAIN ROAD TO DILJAN ALI HOUSE |
349300 |
CONSTRUCTION OF CONCRETE ROAD FROM MAIN ROAD TO DILJAN ALI HOUSE1 |
Plinth level |
-
latitude : 22.38463918,22.38463383,22.38462217
Longitude : 87.45733519,87.45733261,87.45732067
file name : Image_18022022175712697.png
|
2022-02-18 17:57:12.793072 |
13 |
35069045 |
CC RODE FROM AMAR ALI HOUSE TO RAHAMAT ALI HOUSE AT MAHESHPUR |
249400 |
CC RODE FROM AMAR ALI HOUSE TO RAHAMAT ALI HOUSE AT MAHESHPUR1 |
Roof laid |
-
latitude : 22.44001327,22.44001384,22.44002478
Longitude : 87.48238154,87.48237638,87.48237239
file name : Image_04042022140614322.png
|
2022-04-04 14:06:14.429246 |
14 |
35069045 |
CC RODE FROM AMAR ALI HOUSE TO RAHAMAT ALI HOUSE AT MAHESHPUR |
249400 |
CC RODE FROM AMAR ALI HOUSE TO RAHAMAT ALI HOUSE AT MAHESHPUR1 |
Roof laid |
-
latitude : 22.41755083,22.41755083,22.44002372
Longitude : 87.4774818,87.4774818,87.48239056
file name : Image_24012022134609960.png
|
2022-01-24 13:46:10.097357 |
15 |
35069045 |
CC RODE FROM AMAR ALI HOUSE TO RAHAMAT ALI HOUSE AT MAHESHPUR |
249400 |
CC RODE FROM AMAR ALI HOUSE TO RAHAMAT ALI HOUSE AT MAHESHPUR1 |
Plinth level |
-
latitude : 22.44000793,22.4400397,22.44006186
Longitude : 87.48236387,87.48237205,87.4823695
file name : Image_22122021134526211.png
|
2021-12-22 13:45:26.33103 |
16 |
35069045 |
CC RODE FROM AMAR ALI HOUSE TO RAHAMAT ALI HOUSE AT MAHESHPUR |
249400 |
CC RODE FROM AMAR ALI HOUSE TO RAHAMAT ALI HOUSE AT MAHESHPUR1 |
Completion of work |
-
latitude : 22.43999346,22.44000885,22.44005704
Longitude : 87.48228653,87.48229762,87.48232098
file name : Image_22122021133551596.png
|
2021-12-22 13:35:51.703876 |
17 |
46909078 |
SINKING OF SUBMERSIBLE PUMP WITH PIPELINE NEAR SK RAPHIK ALI HOUSE AT CHOWPENIA |
219500 |
SINKING OF SUBMERSIBLE PUMP WITH PIPELINE NEAR SK RAPHIK ALI HOUSE AT CHOWPENIA1 |
Plinth level |
-
latitude : 22.41680657
Longitude : 87.4778624
file name : Image_04042022131710639.png
|
2022-04-04 13:17:10.730259 |
18 |
46909078 |
SINKING OF SUBMERSIBLE PUMP WITH PIPELINE NEAR SK RAPHIK ALI HOUSE AT CHOWPENIA |
219500 |
SINKING OF SUBMERSIBLE PUMP WITH PIPELINE NEAR SK RAPHIK ALI HOUSE AT CHOWPENIA1 |
Completion of work |
-
latitude : 22.41673525
Longitude : 87.47786599
file name : Image_29032022141446649.png
|
2022-03-29 14:14:46.727513 |
19 |
46909078 |
SINKING OF SUBMERSIBLE PUMP WITH PIPELINE NEAR SK RAPHIK ALI HOUSE AT CHOWPENIA |
219500 |
SINKING OF SUBMERSIBLE PUMP WITH PIPELINE NEAR SK RAPHIK ALI HOUSE AT CHOWPENIA1 |
Plinth level |
-
latitude : 22.41672231
Longitude : 87.47786962
file name : Image_29032022141630025.png
|
2022-03-29 14:16:30.112369 |
20 |
46785071 |
CONSTRUCTION OF CONCRETE ROAD FROM KALIARA MAIN MORUM ROAD TO MAHATA PARA AT KALIARA |
309850 |
CONSTRUCTION OF CONCRETE ROAD FROM KALIARA MAIN MORUM ROAD TO MAHATA PARA AT KALIARA1 |
Roof laid |
-
latitude : 22.40542918,22.40543305,22.40542498
Longitude : 87.44661402,87.44661566,87.44660262
file name : Image_05042022160716034.png
|
2022-04-05 16:07:16.122448 |
21 |
46785071 |
CONSTRUCTION OF CONCRETE ROAD FROM KALIARA MAIN MORUM ROAD TO MAHATA PARA AT KALIARA |
309850 |
CONSTRUCTION OF CONCRETE ROAD FROM KALIARA MAIN MORUM ROAD TO MAHATA PARA AT KALIARA1 |
Plinth level |
-
latitude : 22.40539674,22.40539506,22.40539484
Longitude : 87.44661953,87.44663044,87.4466465
file name : Image_31032022161638784.png
|
2022-03-31 16:16:38.877861 |
22 |
46785071 |
CONSTRUCTION OF CONCRETE ROAD FROM KALIARA MAIN MORUM ROAD TO MAHATA PARA AT KALIARA |
309850 |
CONSTRUCTION OF CONCRETE ROAD FROM KALIARA MAIN MORUM ROAD TO MAHATA PARA AT KALIARA1 |
Completion of work |
-
latitude : 22.40540893,22.4053996
Longitude : 87.4466806,87.44669296
file name : Image_31032022161113925.png
|
2022-03-31 16:11:14.014597 |
23 |
35197224 |
CC DRAIN FROM MAIN CANEL TO PRANAB DE POND AT BAR BASANTAPUR |
149650 |
CC DRAIN FROM MAIN CANEL TO PRANAB DE POND AT BAR BASANTAPUR1 |
Roof laid |
-
latitude : 22.39118134,22.39120112,22.39120326
Longitude : 87.48556095,87.48557248,87.4855837
file name : Image_26052022125035757.png
|
2022-05-26 12:50:35.892897 |
24 |
35197224 |
CC DRAIN FROM MAIN CANEL TO PRANAB DE POND AT BAR BASANTAPUR |
149650 |
CC DRAIN FROM MAIN CANEL TO PRANAB DE POND AT BAR BASANTAPUR1 |
Plinth level |
-
latitude : 22.4091718,22.39117289,22.39118542
Longitude : 87.47016046,87.48558431,87.48557339
file name : Image_26052022124644957.png
|
2022-05-26 12:46:45.089243 |
25 |
39125657 |
CONSTRUCTION PF CALVAT IN FRONT OF CHAKRABORTY VATA AT PELAGERIA |
663278 |
CONSTRUCTION PF CALVAT IN FRONT OF CHAKRABORTY VATA AT PELAGERIA1 |
Completion of work |
-
latitude : 22.39313064,22.39314196,22.39315632
Longitude : 87.45058924,87.45057597,87.45056138
file name : Image_24082022171232721.png
|
2022-08-24 17:12:32.817705 |
26 |
39125657 |
CONSTRUCTION PF CALVAT IN FRONT OF CHAKRABORTY VATA AT PELAGERIA |
663278 |
CONSTRUCTION PF CALVAT IN FRONT OF CHAKRABORTY VATA AT PELAGERIA1 |
Plinth level |
-
latitude : 22.39322264,22.39321904,22.393188
Longitude : 87.45061013,87.45061463,87.45060406
file name : Image_24082022171723971.png
|
2022-08-24 17:17:24.076693 |
27 |
39125657 |
CONSTRUCTION PF CALVAT IN FRONT OF CHAKRABORTY VATA AT PELAGERIA |
663278 |
CONSTRUCTION PF CALVAT IN FRONT OF CHAKRABORTY VATA AT PELAGERIA1 |
Roof laid |
-
latitude : 22.39312605,22.39312605,22.3931526
Longitude : 87.45061391,87.45062641,87.45063527
file name : Image_01092022112500755.png
|
2022-09-01 11:25:00.856576 |
28 |
46868999 |
CONSTRUCTION OF PUCCA DRAIN FROM RAMPUR 4 NO CANEL TO SSK AT RAMPUR |
249750 |
CONSTRUCTION OF PUCCA DRAIN FROM RAMPUR 4 NO CANEL TO SSK AT RAMPUR1 |
Roof laid |
-
latitude : 22.38371179,22.38374836,22.3837455
Longitude : 87.47515622,87.47518216,87.47521729
file name : Image_01092022114212830.png
|
2022-09-01 11:42:12.954648 |
29 |
46868999 |
CONSTRUCTION OF PUCCA DRAIN FROM RAMPUR 4 NO CANEL TO SSK AT RAMPUR |
249750 |
CONSTRUCTION OF PUCCA DRAIN FROM RAMPUR 4 NO CANEL TO SSK AT RAMPUR1 |
Plinth level |
-
latitude : 22.38371308,22.38374464,22.38373757
Longitude : 87.47518068,87.47521249,87.4752415
file name : Image_01092022114023061.png
|
2022-09-01 11:40:23.160897 |
30 |
46868999 |
CONSTRUCTION OF PUCCA DRAIN FROM RAMPUR 4 NO CANEL TO SSK AT RAMPUR |
249750 |
CONSTRUCTION OF PUCCA DRAIN FROM RAMPUR 4 NO CANEL TO SSK AT RAMPUR1 |
Completion of work |
-
latitude : 22.38371827,22.38373222,22.38374566
Longitude : 87.47516596,87.47518176,87.47523129
file name : Image_01092022113550083.png
|
2022-09-01 11:35:50.19108 |
31 |
46786628 |
CONSRUCTION OF MOTHER & CHILD CARE ROOM FOR WOMEN AT GRAM PANCHAYAT OFFICE |
349900 |
CONSRUCTION OF MOTHER & CHILD CARE ROOM FOR WOMEN AT GRAM PANCHAYAT OFFICE1 |
Plinth level |
-
latitude : 22.3984659
Longitude : 87.4790186
file name : Image_16122022154956615.png
|
2022-12-16 15:49:56.733554 |
32 |
46786628 |
CONSRUCTION OF MOTHER & CHILD CARE ROOM FOR WOMEN AT GRAM PANCHAYAT OFFICE |
349900 |
CONSRUCTION OF MOTHER & CHILD CARE ROOM FOR WOMEN AT GRAM PANCHAYAT OFFICE1 |
Completion of work |
-
latitude : 22.398454
Longitude : 87.4790535
file name : Image_16122022153250235.png
|
2022-12-16 15:32:50.348835 |
33 |
46779316 |
CONSTRUCTION OF CONCRETE ROAD FROM CHOWPENIA NIMAI PATRA HOUSE SHITALA MANDIR AT CHOWPENIA |
306100 |
CONSTRUCTION OF CONCRETE ROAD FROM CHOWPENIA NIMAI PATRA HOUSE SHITALA MANDIR AT CHOWPENIA1 |
Roof laid |
-
latitude : 22.41794296,22.41794859,22.41796329
Longitude : 87.48707875,87.48709305,87.48711536
file name : Image_21122022125527046.png
|
2022-12-21 12:55:27.167902 |
34 |
46779316 |
CONSTRUCTION OF CONCRETE ROAD FROM CHOWPENIA NIMAI PATRA HOUSE SHITALA MANDIR AT CHOWPENIA |
306100 |
CONSTRUCTION OF CONCRETE ROAD FROM CHOWPENIA NIMAI PATRA HOUSE SHITALA MANDIR AT CHOWPENIA1 |
Plinth level |
-
latitude : 22.41797497,22.41798428,22.41800544
Longitude : 87.4870871,87.48709367,87.48711659
file name : Image_21122022125312477.png
|
2022-12-21 12:53:12.594626 |
35 |
46779316 |
CONSTRUCTION OF CONCRETE ROAD FROM CHOWPENIA NIMAI PATRA HOUSE SHITALA MANDIR AT CHOWPENIA |
306100 |
CONSTRUCTION OF CONCRETE ROAD FROM CHOWPENIA NIMAI PATRA HOUSE SHITALA MANDIR AT CHOWPENIA1 |
Completion of work |
-
latitude : 22.4179945,22.41799694,22.41800246
Longitude : 87.48706988,87.48707642,87.48710131
file name : Image_21122022124941653.png
|
2022-12-21 12:49:41.774435 |
36 |
46867220 |
CONSTRUCTION OF PUCCA DRAIN FROM RAJESH SING HOUSE TO TARUN ROUT GROUND AT MOMINPUR |
260200 |
CONSTRUCTION OF PUCCA DRAIN FROM RAJESH SING HOUSE TO TARUN ROUT GROUND AT MOMINPUR1 |
Roof laid |
-
latitude : 22.42959844,22.42961512,22.42961972
Longitude : 87.48225829,87.48226522,87.4822621
file name : Image_21122022122248891.png
|
2022-12-21 12:22:48.992681 |
37 |
46867220 |
CONSTRUCTION OF PUCCA DRAIN FROM RAJESH SING HOUSE TO TARUN ROUT GROUND AT MOMINPUR |
260200 |
CONSTRUCTION OF PUCCA DRAIN FROM RAJESH SING HOUSE TO TARUN ROUT GROUND AT MOMINPUR1 |
Plinth level |
-
latitude : 22.42954947,22.4295667,22.42959778
Longitude : 87.48222333,87.48222546,87.48224048
file name : Image_21122022122038221.png
|
2022-12-21 12:20:38.321848 |
38 |
46867220 |
CONSTRUCTION OF PUCCA DRAIN FROM RAJESH SING HOUSE TO TARUN ROUT GROUND AT MOMINPUR |
260200 |
CONSTRUCTION OF PUCCA DRAIN FROM RAJESH SING HOUSE TO TARUN ROUT GROUND AT MOMINPUR1 |
Completion of work |
-
latitude : 22.42959901,22.42959138,22.42957356
Longitude : 87.48227163,87.48226766,87.48226267
file name : Image_21122022120930360.png
|
2022-12-21 12:09:30.461917 |
39 |
48851633 |
CONSTRUCTION OF CONCRETE ROAD FROM GOPALPUR MAIN CONCRETE ROAD TO BABLU KHAN |
177700 |
CONSTRUCTION OF CONCRETE ROAD FROM GOPALPUR MAIN CONCRETE ROAD TO BABLU KHAN1 |
Roof laid |
-
latitude : 22.41211553,22.41214211,22.41215963
Longitude : 87.4458677,87.4458611,87.44585696
file name : Image_13012023100557657.png
|
2023-01-13 10:05:57.728052 |
40 |
48851633 |
CONSTRUCTION OF CONCRETE ROAD FROM GOPALPUR MAIN CONCRETE ROAD TO BABLU KHAN |
177700 |
CONSTRUCTION OF CONCRETE ROAD FROM GOPALPUR MAIN CONCRETE ROAD TO BABLU KHAN1 |
Plinth level |
-
latitude : 22.41207844,22.41208976,22.41215816
Longitude : 87.44586857,87.44586876,87.44587008
file name : Image_13012023100256313.png
|
2023-01-13 10:02:56.396516 |
41 |
48851633 |
CONSTRUCTION OF CONCRETE ROAD FROM GOPALPUR MAIN CONCRETE ROAD TO BABLU KHAN |
177700 |
CONSTRUCTION OF CONCRETE ROAD FROM GOPALPUR MAIN CONCRETE ROAD TO BABLU KHAN1 |
Completion of work |
-
latitude : 22.41214325,22.412148,22.41215065
Longitude : 87.44582467,87.44582929,87.44583683
file name : Image_13012023100041811.png
|
2023-01-13 10:00:41.89866 |
42 |
46868569 |
CONSTRUCTION OF PUCCA DRAIN FROM UTTAR PARA HEMANTA FIELD TO JAGADISH JANA AT SAHARDA |
174884 |
CONSTRUCTION OF PUCCA DRAIN FROM UTTAR PARA HEMANTA FIELD TO JAGADISH JANA AT SAHARDA1 |
Completion of work |
-
latitude : 22.38468979,22.38464851,22.38466549
Longitude : 87.49597553,87.49596962,87.49590628
file name : Image_13012023145853573.png
|
2023-01-13 14:58:53.680474 |
43 |
46868569 |
CONSTRUCTION OF PUCCA DRAIN FROM UTTAR PARA HEMANTA FIELD TO JAGADISH JANA AT SAHARDA |
174884 |
CONSTRUCTION OF PUCCA DRAIN FROM UTTAR PARA HEMANTA FIELD TO JAGADISH JANA AT SAHARDA1 |
Plinth level |
-
latitude : 22.38468119,22.38467749,22.38467564
Longitude : 87.49597791,87.49597985,87.49597853
file name : Image_13012023150354225.png
|
2023-01-13 15:03:54.307404 |
44 |
46868569 |
CONSTRUCTION OF PUCCA DRAIN FROM UTTAR PARA HEMANTA FIELD TO JAGADISH JANA AT SAHARDA |
174884 |
CONSTRUCTION OF PUCCA DRAIN FROM UTTAR PARA HEMANTA FIELD TO JAGADISH JANA AT SAHARDA1 |
Roof laid |
-
latitude : 22.38468816,22.38468818,22.38468818
Longitude : 87.49598094,87.49597984,87.49597984
file name : Image_13012023150554888.png
|
2023-01-13 15:05:54.975548 |
45 |
46870255 |
CONSTRUCTION OF PUCCA DRAIN FROM SATTAR KHAN HOUSE TO SAHARAM ALI HOUSE AT SULTANPUR |
151080 |
CONSTRUCTION OF PUCCA DRAIN FROM SATTAR KHAN HOUSE TO SAHARAM ALI HOUSE AT SULTANPUR1 |
Completion of work |
-
latitude : 22.4084332,22.4084322,22.4084322
Longitude : 87.4803138,87.4803136,87.4803136
file name : Image_31012023093328455.png
|
2023-01-31 09:33:28.549824 |
46 |
46870255 |
CONSTRUCTION OF PUCCA DRAIN FROM SATTAR KHAN HOUSE TO SAHARAM ALI HOUSE AT SULTANPUR |
151080 |
CONSTRUCTION OF PUCCA DRAIN FROM SATTAR KHAN HOUSE TO SAHARAM ALI HOUSE AT SULTANPUR1 |
Plinth level |
-
latitude : 22.4084322,22.4084322,22.4084322
Longitude : 87.4803136,87.4803136,87.4803136
file name : Image_31012023093625894.png
|
2023-01-31 09:36:25.98031 |
47 |
46870255 |
CONSTRUCTION OF PUCCA DRAIN FROM SATTAR KHAN HOUSE TO SAHARAM ALI HOUSE AT SULTANPUR |
151080 |
CONSTRUCTION OF PUCCA DRAIN FROM SATTAR KHAN HOUSE TO SAHARAM ALI HOUSE AT SULTANPUR1 |
Roof laid |
-
latitude : 22.4084331,22.4084331,22.4084331
Longitude : 87.4803137,87.4803137,87.4803137
file name : Image_31012023094012574.png
|
2023-01-31 09:40:12.658592 |
48 |
46869347 |
CONSTRUCTION OF PUCCA DRAIN FROM BAR BASANTAPUR PRANOB DE POND TO NARAYAN CHANDRA DAS HOUSE AT BAR |
249200 |
CONSTRUCTION OF PUCCA DRAIN FROM BAR BASANTAPUR PRANOB DE POND TO NARAYAN CHANDRA DAS HOUSE AT BAR 1 |
Completion of work |
-
latitude : 22.39164434,22.39165281,22.39165518,22.39166035
Longitude : 87.48563487,87.48564292,87.48564543,87.48566658
file name : Image_31012023095114339.png
|
2023-01-31 09:51:14.436479 |
49 |
46869347 |
CONSTRUCTION OF PUCCA DRAIN FROM BAR BASANTAPUR PRANOB DE POND TO NARAYAN CHANDRA DAS HOUSE AT BAR |
249200 |
CONSTRUCTION OF PUCCA DRAIN FROM BAR BASANTAPUR PRANOB DE POND TO NARAYAN CHANDRA DAS HOUSE AT BAR 1 |
Plinth level |
-
latitude : 22.39164963,22.39164771,22.39165615
Longitude : 87.48566255,87.48567298,87.48568903
file name : Image_31012023095239409.png
|
2023-01-31 09:52:39.503732 |
50 |
46869347 |
CONSTRUCTION OF PUCCA DRAIN FROM BAR BASANTAPUR PRANOB DE POND TO NARAYAN CHANDRA DAS HOUSE AT BAR |
249200 |
CONSTRUCTION OF PUCCA DRAIN FROM BAR BASANTAPUR PRANOB DE POND TO NARAYAN CHANDRA DAS HOUSE AT BAR 1 |
Roof laid |
-
latitude : 22.39166131,22.39166343,22.39167182
Longitude : 87.48565431,87.48566516,87.48568204
file name : Image_31012023095409381.png
|
2023-01-31 09:54:09.474574 |
51 |
66362061 |
Creation of drainage channel for management of grey water |
152628 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.39334169,22.39335578,22.39336284
Longitude : 87.44462465,87.4446251,87.44462353
file name : Image_15022023165532059.png
|
2023-02-15 16:55:32.16279 |
52 |
66362061 |
Creation of drainage channel for management of grey water |
152628 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.39334428,22.39334217,22.39335518
Longitude : 87.44461486,87.44457902,87.44456277
file name : Image_15022023164226977.png
|
2023-02-15 16:42:27.080309 |
53 |
66338669 |
INSTALLATION OF SINGLE POLE SOLAR LIGHT NEAR PELAGERIA SHITALA MANDIR |
43730 |
INSTALLATION OF SINGLE POLE SOLAR LIGHT NEAR PELAGERIA SHITALA MANDIR1 |
Roof laid |
-
latitude : 22.3943013
Longitude : 87.4559171
file name : Image_08032023090330218.png
|
2023-03-08 09:03:30.293737 |
54 |
66338669 |
INSTALLATION OF SINGLE POLE SOLAR LIGHT NEAR PELAGERIA SHITALA MANDIR |
43730 |
INSTALLATION OF SINGLE POLE SOLAR LIGHT NEAR PELAGERIA SHITALA MANDIR1 |
Roof laid |
-
latitude : 22.39490539
Longitude : 87.44512543
file name : Image_08032023085752627.png
|
2023-03-08 08:57:52.701498 |
55 |
66338669 |
INSTALLATION OF SINGLE POLE SOLAR LIGHT NEAR PELAGERIA SHITALA MANDIR |
43730 |
INSTALLATION OF SINGLE POLE SOLAR LIGHT NEAR PELAGERIA SHITALA MANDIR1 |
Completion of work |
-
latitude : 22.39490427
Longitude : 87.44514735
file name : Image_08032023085354657.png
|
2023-03-08 08:53:54.748134 |
56 |
66338669 |
INSTALLATION OF SINGLE POLE SOLAR LIGHT NEAR PELAGERIA SHITALA MANDIR |
43730 |
INSTALLATION OF SINGLE POLE SOLAR LIGHT NEAR PELAGERIA SHITALA MANDIR1 |
Plinth level |
-
latitude : 22.39489451
Longitude : 87.4451449
file name : Image_08032023085545595.png
|
2023-03-08 08:55:45.681238 |
57 |
66338655 |
INSTALLATION OF SINGLE POLE SOLAR LIGHT NEAR PELAGERIA KALI MANDIR |
43730 |
INSTALLATION OF SINGLE POLE SOLAR LIGHT NEAR PELAGERIA KALI MANDIR1 |
Plinth level |
-
latitude : 22.39564603
Longitude : 87.45590875
file name : Image_08032023084310978.png
|
2023-03-08 08:43:11.055506 |
58 |
66338655 |
INSTALLATION OF SINGLE POLE SOLAR LIGHT NEAR PELAGERIA KALI MANDIR |
43730 |
INSTALLATION OF SINGLE POLE SOLAR LIGHT NEAR PELAGERIA KALI MANDIR1 |
Completion of work |
-
latitude : 22.39560826
Longitude : 87.4559272
file name : Image_08032023083830631.png
|
2023-03-08 08:38:30.710896 |
59 |
66338718 |
CONSTRUCTION OF CONCRETE ROAD FROM OT ROAD TO SUB CENTER AT PELAGERIA |
198059 |
CONSTRUCTION OF CONCRETE ROAD FROM OT ROAD TO SUB CENTER AT PELAGERIA1 |
Plinth level |
-
latitude : 22.3942732,22.3942732,22.3942732
Longitude : 87.4558842,87.4558842,87.4558842
file name : Image_01032023113436862.png
|
2023-03-01 11:34:36.974196 |
60 |
66338718 |
CONSTRUCTION OF CONCRETE ROAD FROM OT ROAD TO SUB CENTER AT PELAGERIA |
198059 |
CONSTRUCTION OF CONCRETE ROAD FROM OT ROAD TO SUB CENTER AT PELAGERIA1 |
Completion of work |
-
latitude : 22.3942771,22.3942771,22.3942771
Longitude : 87.4558972,87.4558972,87.4558972
file name : Image_01032023112712071.png
|
2023-03-01 11:27:12.163152 |
61 |
66338718 |
CONSTRUCTION OF CONCRETE ROAD FROM OT ROAD TO SUB CENTER AT PELAGERIA |
198059 |
CONSTRUCTION OF CONCRETE ROAD FROM OT ROAD TO SUB CENTER AT PELAGERIA1 |
Completion of work |
-
latitude : 22.394272,22.394272,22.394272
Longitude : 87.4558812,87.4558812,87.4558812
file name : Image_01032023112600784.png
|
2023-03-01 11:26:00.878505 |
62 |
59065611 |
CONST OF CONCRETE ROAD FROM SHAKTI BRAHMA HOUSE TO SUNIL BRAHMA HOUSE AT MEUDIPUR 15TH UNTIED |
349092 |
CONST OF CONCRETE ROAD FROM SHAKTI BRAHMA HOUSE TO SUNIL BRAHMA HOUSE AT MEUDIPUR 15TH UNTIED1 |
Roof laid |
-
latitude : 22.42203191,22.42205645,22.42207082
Longitude : 87.47946778,87.47944615,87.47942605
file name : Image_01032023121802955.png
|
2023-03-01 12:18:03.03874 |
63 |
59065611 |
CONST OF CONCRETE ROAD FROM SHAKTI BRAHMA HOUSE TO SUNIL BRAHMA HOUSE AT MEUDIPUR 15TH UNTIED |
349092 |
CONST OF CONCRETE ROAD FROM SHAKTI BRAHMA HOUSE TO SUNIL BRAHMA HOUSE AT MEUDIPUR 15TH UNTIED1 |
Plinth level |
-
latitude : 22.42204405,22.4220587,22.42206229
Longitude : 87.47947569,87.4794917,87.47945634
file name : Image_01032023121443644.png
|
2023-03-01 12:14:43.729941 |
64 |
59065611 |
CONST OF CONCRETE ROAD FROM SHAKTI BRAHMA HOUSE TO SUNIL BRAHMA HOUSE AT MEUDIPUR 15TH UNTIED |
349092 |
CONST OF CONCRETE ROAD FROM SHAKTI BRAHMA HOUSE TO SUNIL BRAHMA HOUSE AT MEUDIPUR 15TH UNTIED1 |
Completion of work |
-
latitude : 22.4216162,22.4216162,22.4216162
Longitude : 87.4798299,87.4798299,87.4798299
file name : Image_01032023121045900.png
|
2023-03-01 12:10:46.009517 |
65 |
56500829 |
EXTENSION OF PIPELINE FROM SK TUTUL HOUSE TONUR BIBI HOUSE AT D DHEKIA |
60000 |
EXTENSION OF PIPELINE FROM SK TUTUL HOUSE TONUR BIBI HOUSE AT D DHEKIA1 |
Roof laid |
-
latitude : 22.38588663,22.38589129,22.38588321
Longitude : 87.44422727,87.44423918,87.44422689
file name : Image_10032023110547977.png
|
2023-03-10 11:05:48.055329 |
66 |
56500829 |
EXTENSION OF PIPELINE FROM SK TUTUL HOUSE TONUR BIBI HOUSE AT D DHEKIA |
60000 |
EXTENSION OF PIPELINE FROM SK TUTUL HOUSE TONUR BIBI HOUSE AT D DHEKIA1 |
Plinth level |
-
latitude : 22.38587566,22.38587292,22.38587055
Longitude : 87.44417659,87.44416929,87.44415225
file name : Image_10032023110338548.png
|
2023-03-10 11:03:38.702019 |
67 |
56500829 |
EXTENSION OF PIPELINE FROM SK TUTUL HOUSE TONUR BIBI HOUSE AT D DHEKIA |
60000 |
EXTENSION OF PIPELINE FROM SK TUTUL HOUSE TONUR BIBI HOUSE AT D DHEKIA1 |
Completion of work |
-
latitude : 22.38588407,22.38589084,22.38588811
Longitude : 87.44418546,87.44418471,87.44418136
file name : Image_10032023105835770.png
|
2023-03-10 10:58:35.866942 |
68 |
59158045 |
CONST OF CONCRETE ROAD FROM BLACK TOP ROAD TO BALAI KISKU HOUSE AT DAKSHIN DHEKIA 15TH FUND |
81540 |
CONST OF CONCRETE ROAD FROM BLACK TOP ROAD TO BALAI KISKU HOUSE AT DAKSHIN DHEKIA 15TH FUND 1 |
Plinth level |
-
latitude : 22.38831376,22.38829372
Longitude : 87.43984092,87.43983487
file name : Image_10032023112429102.png
|
2023-03-10 11:24:29.190483 |
69 |
59158045 |
CONST OF CONCRETE ROAD FROM BLACK TOP ROAD TO BALAI KISKU HOUSE AT DAKSHIN DHEKIA 15TH FUND |
81540 |
CONST OF CONCRETE ROAD FROM BLACK TOP ROAD TO BALAI KISKU HOUSE AT DAKSHIN DHEKIA 15TH FUND 1 |
Plinth level |
-
latitude : 22.38838305,22.38836659,22.3883547
Longitude : 87.43980938,87.43980489,87.43980769
file name : Image_10032023112155497.png
|
2023-03-10 11:21:55.584433 |
70 |
59158045 |
CONST OF CONCRETE ROAD FROM BLACK TOP ROAD TO BALAI KISKU HOUSE AT DAKSHIN DHEKIA 15TH FUND |
81540 |
CONST OF CONCRETE ROAD FROM BLACK TOP ROAD TO BALAI KISKU HOUSE AT DAKSHIN DHEKIA 15TH FUND 1 |
Completion of work |
-
latitude : 22.38836176,22.38834918,22.38833683
Longitude : 87.43980883,87.43980808,87.43980451
file name : Image_10032023111924322.png
|
2023-03-10 11:19:24.415219 |
71 |
35255673 |
SINKING A SUBMERSIBLE PUMP WITH PIPE LINE AT POYNOB PARA AT GOPALPUR |
249300 |
SINKING A SUBMERSIBLE PUMP WITH PIPE LINE AT POYNOB PARA AT GOPALPUR1 |
Roof laid |
-
latitude : 22.41307027
Longitude : 87.44414646
file name : Image_24042021095417783.png
|
2021-04-24 09:54:17.913815 |
72 |
35255673 |
SINKING A SUBMERSIBLE PUMP WITH PIPE LINE AT POYNOB PARA AT GOPALPUR |
249300 |
SINKING A SUBMERSIBLE PUMP WITH PIPE LINE AT POYNOB PARA AT GOPALPUR1 |
Plinth level |
-
latitude : 22.41305096
Longitude : 87.44412689
file name : Image_02022021095821527.png
|
2021-02-02 09:58:21.641399 |
73 |
35255673 |
SINKING A SUBMERSIBLE PUMP WITH PIPE LINE AT POYNOB PARA AT GOPALPUR |
249300 |
SINKING A SUBMERSIBLE PUMP WITH PIPE LINE AT POYNOB PARA AT GOPALPUR1 |
Completion of work |
-
latitude : 22.41306768
Longitude : 87.44402867
file name : Image_24012021100301637.png
|
2021-01-24 10:03:01.71709 |
74 |
35246266 |
E OF PIPE LINE FROM SING PARA AND KHAMRAI PARA AT MEUDICHAK |
124898 |
E OF PIPE LINE FROM SING PARA AND KHAMRAI PARA AT MEUDICHAK1 |
Roof laid |
-
latitude : 22.39053293,22.39053082,22.39048735
Longitude : 87.4794302,87.4794171,87.47941157
file name : Image_26042021120531289.png
|
2021-04-26 12:05:31.370819 |
75 |
35246266 |
E OF PIPE LINE FROM SING PARA AND KHAMRAI PARA AT MEUDICHAK |
124898 |
E OF PIPE LINE FROM SING PARA AND KHAMRAI PARA AT MEUDICHAK1 |
Plinth level |
-
latitude : 22.39056193,22.39057548,22.3905841
Longitude : 87.47939105,87.47941902,87.4794382
file name : Image_24042021111725170.png
|
2021-04-24 11:17:25.278286 |
76 |
35246266 |
E OF PIPE LINE FROM SING PARA AND KHAMRAI PARA AT MEUDICHAK |
124898 |
E OF PIPE LINE FROM SING PARA AND KHAMRAI PARA AT MEUDICHAK1 |
Completion of work |
-
latitude : 22.39060136,22.39051943,22.39049831
Longitude : 87.47937071,87.47937567,87.47937985
file name : Image_29012021170412665.png
|
2021-01-29 17:04:12.768625 |
77 |
35193765 |
EXTENSION OF PIPE LINE FROM ATASI SING HOUSE TO DAKSHIN PARA BASANTAPUR PRIMARY SCHOOL AT BOGDIHI |
74500 |
EXTENSION OF PIPE LINE FROM ATASI SING HOUSE TO DAKSHIN PARA BASANTAPUR PRIMARY SCHOOL AT BOGDIHI1 |
Roof laid |
-
latitude : 22.38509611,22.38507759,22.38503393
Longitude : 87.48533238,87.48532195,87.4853275
file name : Image_26042021121109584.png
|
2021-04-26 12:11:09.689838 |
78 |
35193765 |
EXTENSION OF PIPE LINE FROM ATASI SING HOUSE TO DAKSHIN PARA BASANTAPUR PRIMARY SCHOOL AT BOGDIHI |
74500 |
EXTENSION OF PIPE LINE FROM ATASI SING HOUSE TO DAKSHIN PARA BASANTAPUR PRIMARY SCHOOL AT BOGDIHI1 |
Plinth level |
-
latitude : 22.38512253,22.38511612,22.38507924
Longitude : 87.48532858,87.4853192,87.48532498
file name : Image_24042021105845656.png
|
2021-04-24 10:58:45.768641 |
79 |
35193765 |
EXTENSION OF PIPE LINE FROM ATASI SING HOUSE TO DAKSHIN PARA BASANTAPUR PRIMARY SCHOOL AT BOGDIHI |
74500 |
EXTENSION OF PIPE LINE FROM ATASI SING HOUSE TO DAKSHIN PARA BASANTAPUR PRIMARY SCHOOL AT BOGDIHI1 |
Completion of work |
-
latitude : 22.38516332,22.38506177,22.38497499
Longitude : 87.48532377,87.48532848,87.48533884
file name : Image_21012021163558297.png
|
2021-01-21 16:35:58.394327 |
80 |
35190080 |
EXTENTION OF PIPE LINE OF DHARAPARA AT CHOWPENIA |
99806 |
EXTENTION OF PIPE LINE OF DHARAPARA AT CHOWPENIA1 |
Roof laid |
-
latitude : 22.4193435,22.41935438
Longitude : 87.48627114,87.48626862
file name : Image_04042022133806019.png
|
2022-04-04 13:38:06.14103 |
81 |
35190080 |
EXTENTION OF PIPE LINE OF DHARAPARA AT CHOWPENIA |
99806 |
EXTENTION OF PIPE LINE OF DHARAPARA AT CHOWPENIA1 |
Plinth level |
-
latitude : 22.41912194,22.41913646,22.41911682
Longitude : 87.48754533,87.48755998,87.48752477
file name : Image_21052021083518031.png
|
2021-05-21 08:35:18.146726 |
82 |
35190080 |
EXTENTION OF PIPE LINE OF DHARAPARA AT CHOWPENIA |
99806 |
EXTENTION OF PIPE LINE OF DHARAPARA AT CHOWPENIA1 |
Completion of work |
-
latitude : 22.41912036,22.41910894,22.41908796
Longitude : 87.48752294,87.48750657,87.48748569
file name : Image_21052021082751490.png
|
2021-05-21 08:27:51.598033 |
83 |
35071343 |
CC DRAIN FROM ASIT DANDAPAT HOUSE TO PRAVANJAN GHOSH HOUSE AT SULTANPUR |
99850 |
CC DRAIN FROM ASIT DANDAPAT HOUSE TO PRAVANJAN GHOSH HOUSE AT SULTANPUR1 |
Plinth level |
-
latitude : 22.40445573,22.40446034,22.40445988
Longitude : 87.47527114,87.4752863,87.47528924
file name : Image_04042022143441892.png
|
2022-04-04 14:34:42.020537 |
84 |
35071343 |
CC DRAIN FROM ASIT DANDAPAT HOUSE TO PRAVANJAN GHOSH HOUSE AT SULTANPUR |
99850 |
CC DRAIN FROM ASIT DANDAPAT HOUSE TO PRAVANJAN GHOSH HOUSE AT SULTANPUR1 |
Completion of work |
-
latitude : 22.4044129,22.4044123
Longitude : 87.4747347,87.4747383
file name : Image_10022021170522674.png
|
2021-02-10 17:05:22.753154 |
85 |
35078263 |
EXTENSION OF PIPE LINE AT SULTANPUR RUSTAM ALI HOUSE |
49622 |
EXTENSION OF PIPE LINE AT SULTANPUR RUSTAM ALI HOUSE1 |
Roof laid |
-
latitude : 22.40669028,22.40669321,22.40671331
Longitude : 87.47855615,87.47856938,87.47858594
file name : Image_07072021103051367.png
|
2021-07-07 10:30:51.467323 |
86 |
35078263 |
EXTENSION OF PIPE LINE AT SULTANPUR RUSTAM ALI HOUSE |
49622 |
EXTENSION OF PIPE LINE AT SULTANPUR RUSTAM ALI HOUSE1 |
Plinth level |
-
latitude : 22.40669779,22.40669965,22.40670315
Longitude : 87.47852994,87.47854252,87.47852656
file name : Image_07072021102659740.png
|
2021-07-07 10:26:59.846755 |
87 |
35078263 |
EXTENSION OF PIPE LINE AT SULTANPUR RUSTAM ALI HOUSE |
49622 |
EXTENSION OF PIPE LINE AT SULTANPUR RUSTAM ALI HOUSE1 |
Completion of work |
-
latitude : 22.40666536,22.40667095
Longitude : 87.4785255,87.47851963
file name : Image_07072021102040175.png
|
2021-07-07 10:20:40.267501 |
88 |
35078263 |
EXTENSION OF PIPE LINE AT SULTANPUR RUSTAM ALI HOUSE |
49622 |
EXTENSION OF PIPE LINE AT SULTANPUR RUSTAM ALI HOUSE1 |
Completion of work |
-
latitude : 22.40681737,22.40675971,22.40675631
Longitude : 87.47852285,87.47854464,87.47856615
file name : Image_25062021131043922.png
|
2021-06-25 13:10:44.030756 |
89 |
59154118 |
CONCRETE ROAD FROM PRAKASH DINDA HOUSE TO MANNA PARA AT KALIARA 15TH UNTIED FUND |
205724 |
CONCRETE ROAD FROM PRAKASH DINDA HOUSE TO MANNA PARA AT KALIARA 15TH UNTIED FUND1 |
Roof laid |
-
latitude : 22.40455616,22.40456584,22.40458792
Longitude : 87.45139809,87.45140682,87.45141256
file name : Image_14032023093847335.png
|
2023-03-14 09:38:47.421539 |
90 |
59154118 |
CONCRETE ROAD FROM PRAKASH DINDA HOUSE TO MANNA PARA AT KALIARA 15TH UNTIED FUND |
205724 |
CONCRETE ROAD FROM PRAKASH DINDA HOUSE TO MANNA PARA AT KALIARA 15TH UNTIED FUND1 |
Plinth level |
-
latitude : 22.40453923,22.40458043,22.40457961
Longitude : 87.45141731,87.45143238,87.45143973
file name : Image_14032023093349579.png
|
2023-03-14 09:33:49.661957 |
91 |
59154118 |
CONCRETE ROAD FROM PRAKASH DINDA HOUSE TO MANNA PARA AT KALIARA 15TH UNTIED FUND |
205724 |
CONCRETE ROAD FROM PRAKASH DINDA HOUSE TO MANNA PARA AT KALIARA 15TH UNTIED FUND1 |
Completion of work |
-
latitude : 22.40452902,22.40456298,22.40460161
Longitude : 87.45137164,87.45138301,87.45138766
file name : Image_14032023092339558.png
|
2023-03-14 09:23:39.636818 |
92 |
59064518 |
CONST OF CONCRETE ROAD FROM RANJIT GHORAI HOUSE TO MANIK DHARA HOUSE AT CHOWPENIA 15TH UNTIED FUND |
301817 |
CONST OF CONCRETE ROAD FROM RANJIT GHORAI HOUSE TO MANIK DHARA HOUSE AT CHOWPENIA 15TH UNTIED FUND1 |
Roof laid |
-
latitude : 22.41731278,22.41729087,22.41726762
Longitude : 87.48713594,87.4871319,87.48713326
file name : Image_13032023111828876.png
|
2023-03-13 11:18:28.965199 |
93 |
59064518 |
CONST OF CONCRETE ROAD FROM RANJIT GHORAI HOUSE TO MANIK DHARA HOUSE AT CHOWPENIA 15TH UNTIED FUND |
301817 |
CONST OF CONCRETE ROAD FROM RANJIT GHORAI HOUSE TO MANIK DHARA HOUSE AT CHOWPENIA 15TH UNTIED FUND1 |
Plinth level |
-
latitude : 22.4186597,22.4186597,22.4186597
Longitude : 87.4872936,87.4872936,87.4872936
file name : Image_13032023111613350.png
|
2023-03-13 11:16:13.484182 |
94 |
59064518 |
CONST OF CONCRETE ROAD FROM RANJIT GHORAI HOUSE TO MANIK DHARA HOUSE AT CHOWPENIA 15TH UNTIED FUND |
301817 |
CONST OF CONCRETE ROAD FROM RANJIT GHORAI HOUSE TO MANIK DHARA HOUSE AT CHOWPENIA 15TH UNTIED FUND1 |
Completion of work |
-
latitude : 22.3990963,22.3990963,22.3990963
Longitude : 87.479531,87.479531,87.479531
file name : Image_13032023111227113.png
|
2023-03-13 11:12:27.206432 |
95 |
35279492 |
EXTENSION OF PIPE LINE AT ADIBASI PARA AT PELAGERIA |
49900 |
EXTENSION OF PIPE LINE AT ADIBASI PARA AT PELAGERIA1 |
Plinth level |
-
latitude : 22.38756139,22.38755522,22.38755489
Longitude : 87.45298339,87.45297512,87.45295927
file name : Image_25032022180345557.png
|
2022-03-25 18:03:45.674768 |
96 |
35279492 |
EXTENSION OF PIPE LINE AT ADIBASI PARA AT PELAGERIA |
49900 |
EXTENSION OF PIPE LINE AT ADIBASI PARA AT PELAGERIA1 |
Completion of work |
-
latitude : 22.38753473,22.38753914,22.38753517
Longitude : 87.45295688,87.4529487,87.45292065
file name : Image_25032022175629836.png
|
2022-03-25 17:56:29.951025 |
97 |
35174744 |
CC DRAIN FROM SHAKTI PAL HOUSE TO AJIT PAL HOUSE AT SULTANPUR |
92700 |
CC DRAIN FROM SHAKTI PAL HOUSE TO AJIT PAL HOUSE AT SULTANPUR1 |
Completion of work |
-
latitude : 22.4018718,22.4018718,22.401872
Longitude : 87.4799028,87.4799028,87.4799113
file name : Image_05032022130608614.png
|
2022-03-05 13:06:08.702534 |
98 |
35174744 |
CC DRAIN FROM SHAKTI PAL HOUSE TO AJIT PAL HOUSE AT SULTANPUR |
92700 |
CC DRAIN FROM SHAKTI PAL HOUSE TO AJIT PAL HOUSE AT SULTANPUR1 |
Plinth level |
-
latitude : 22.4018677,22.4018677,22.4018677
Longitude : 87.4799076,87.4799076,87.4799076
file name : Image_05032022131045508.png
|
2022-03-05 13:10:45.611281 |
99 |
35186021 |
EXTENSION OF PIPE LINE FROM SK RAHAMAN HOUSE TO ANOYAR KHAN HOUSE AT DAKSHIN DHEKIA |
49800 |
EXTENSION OF PIPE LINE FROM SK RAHAMAN HOUSE TO ANOYAR KHAN HOUSE AT DAKSHIN DHEKIA1 |
Plinth level |
-
latitude : 22.38588229,22.38589441,22.38588948
Longitude : 87.44474177,87.44469638,87.44462005
file name : Image_12052021092703139.png
|
2021-05-12 09:27:03.234841 |
100 |
35186021 |
EXTENSION OF PIPE LINE FROM SK RAHAMAN HOUSE TO ANOYAR KHAN HOUSE AT DAKSHIN DHEKIA |
49800 |
EXTENSION OF PIPE LINE FROM SK RAHAMAN HOUSE TO ANOYAR KHAN HOUSE AT DAKSHIN DHEKIA1 |
Completion of work |
-
latitude : 22.3859294,22.38594262,22.3859797
Longitude : 87.44471756,87.44476847,87.44487941
file name : Image_14022021115953281.png
|
2021-02-14 11:59:53.378362 |
101 |
35249370 |
E OF PIPE LINE FROM AJIT DE HOUSE TO GOUR SHYAM HOUSE AT RAMPUR |
70058 |
E OF PIPE LINE FROM AJIT DE HOUSE TO GOUR SHYAM HOUSE AT RAMPUR1 |
Roof laid |
-
latitude : 22.38484384,22.38484145,22.3848435
Longitude : 87.47582891,87.47583914,87.47585126
file name : Image_12112021140825507.png
|
2021-11-12 14:08:25.617368 |
102 |
35249370 |
E OF PIPE LINE FROM AJIT DE HOUSE TO GOUR SHYAM HOUSE AT RAMPUR |
70058 |
E OF PIPE LINE FROM AJIT DE HOUSE TO GOUR SHYAM HOUSE AT RAMPUR1 |
Plinth level |
-
latitude : 22.38483385,22.38483072,22.38486777
Longitude : 87.47583676,87.47587099,87.47589428
file name : Image_12112021140455742.png
|
2021-11-12 14:04:55.830086 |
103 |
35249370 |
E OF PIPE LINE FROM AJIT DE HOUSE TO GOUR SHYAM HOUSE AT RAMPUR |
70058 |
E OF PIPE LINE FROM AJIT DE HOUSE TO GOUR SHYAM HOUSE AT RAMPUR1 |
Completion of work |
-
latitude : 22.39123663,22.38486042,22.38490794
Longitude : 87.47772542,87.47588994,87.47592026
file name : Image_12112021135338249.png
|
2021-11-12 13:53:38.378594 |
104 |
35287220 |
CC ROAD FROM P DE HOUSE TO ASWINI DE HOUSE AT MEUDICHAK |
86049 |
CC ROAD FROM P DE HOUSE TO ASWINI DE HOUSE AT MEUDICHAK1 |
Plinth level |
-
latitude : 22.39118262,22.39119181,22.39124546
Longitude : 87.47934434,87.47933896,87.47935075
file name : Image_03012022120011263.png
|
2022-01-03 12:00:11.387397 |
105 |
35287220 |
CC ROAD FROM P DE HOUSE TO ASWINI DE HOUSE AT MEUDICHAK |
86049 |
CC ROAD FROM P DE HOUSE TO ASWINI DE HOUSE AT MEUDICHAK1 |
Completion of work |
-
latitude : 22.38508781,22.39127287,22.39135969
Longitude : 87.45712344,87.4793306,87.47934193
file name : Image_03012022115321197.png
|
2022-01-03 11:53:21.323041 |
106 |
35273262 |
CC DRAIN NEAR MOIN ROUT HOUSE DURGAPUR |
104280 |
CC DRAIN NEAR MOIN ROUT HOUSE DURGAPUR1 |
Plinth level |
-
latitude : 22.39514611,22.39514292,22.39513682
Longitude : 87.45967473,87.45966914,87.45968305
file name : Image_08022022173239145.png
|
2022-02-08 17:32:39.250142 |
107 |
35273262 |
CC DRAIN NEAR MOIN ROUT HOUSE DURGAPUR |
104280 |
CC DRAIN NEAR MOIN ROUT HOUSE DURGAPUR1 |
Completion of work |
-
latitude : 22.39513799,22.39514262,22.39514558
Longitude : 87.45967877,87.45969107,87.45968061
file name : Image_08022022172643212.png
|
2022-02-08 17:26:43.315561 |
108 |
46778984 |
CONSTRUCTION OF CONCRETE ROAD FROM SAHARDA KALIPADA HOUSE TO JAGADISH JANA HOUSE AT SAHARDA |
299500 |
CONSTRUCTION OF CONCRETE ROAD FROM SAHARDA KALIPADA HOUSE TO JAGADISH JANA HOUSE AT SAHARDA1 |
Completion of work |
-
latitude : 22.38509118,22.38509182,22.38513862
Longitude : 87.49398272,87.49397522,87.49401666
file name : Image_07042022132409071.png
|
2022-04-07 13:24:09.156724 |
109 |
46778984 |
CONSTRUCTION OF CONCRETE ROAD FROM SAHARDA KALIPADA HOUSE TO JAGADISH JANA HOUSE AT SAHARDA |
299500 |
CONSTRUCTION OF CONCRETE ROAD FROM SAHARDA KALIPADA HOUSE TO JAGADISH JANA HOUSE AT SAHARDA1 |
Plinth level |
-
latitude : 22.38515332,22.38516129,22.38516409
Longitude : 87.4939726,87.49398942,87.49400741
file name : Image_07042022133532487.png
|
2022-04-07 13:35:32.590714 |
110 |
35191715 |
INSTALLATION OF SUBMERSIBLE PUMP AT DHAL PARA AT MEUDIPUR |
49800 |
INSTALLATION OF SUBMERSIBLE PUMP AT DHAL PARA AT MEUDIPUR1 |
Roof laid |
-
latitude : 22.42510199
Longitude : 87.48138684
file name : Image_12112021144517740.png
|
2021-11-12 14:45:17.853484 |
111 |
35191715 |
INSTALLATION OF SUBMERSIBLE PUMP AT DHAL PARA AT MEUDIPUR |
49800 |
INSTALLATION OF SUBMERSIBLE PUMP AT DHAL PARA AT MEUDIPUR1 |
Plinth level |
-
latitude : 22.42512701
Longitude : 87.48136871
file name : Image_12112021144058932.png
|
2021-11-12 14:40:59.045383 |
112 |
35191715 |
INSTALLATION OF SUBMERSIBLE PUMP AT DHAL PARA AT MEUDIPUR |
49800 |
INSTALLATION OF SUBMERSIBLE PUMP AT DHAL PARA AT MEUDIPUR1 |
Completion of work |
-
latitude : 22.42508943
Longitude : 87.48140948
file name : Image_12112021143159369.png
|
2021-11-12 14:31:59.470911 |
113 |
35073903 |
CC ROAD FROM MAIN BRICKS BATS SOILING TO BIMALA SASMAL HOUSE AT DAKSHIN DHEKIA |
200203 |
CC ROAD FROM MAIN BRICKS BATS SOILING TO BIMALA SASMAL HOUSE AT DAKSHIN DHEKIA1 |
Roof laid |
-
latitude : 22.38961881,22.3896257,22.38962869
Longitude : 87.44003243,87.44005563,87.44011159
file name : Image_24042021093458172.png
|
2021-04-24 09:34:58.28258 |
114 |
35073903 |
CC ROAD FROM MAIN BRICKS BATS SOILING TO BIMALA SASMAL HOUSE AT DAKSHIN DHEKIA |
200203 |
CC ROAD FROM MAIN BRICKS BATS SOILING TO BIMALA SASMAL HOUSE AT DAKSHIN DHEKIA1 |
Plinth level |
-
latitude : 22.38959477,22.38960225,22.38961375
Longitude : 87.44003399,87.44005164,87.44012984
file name : Image_24042021091444675.png
|
2021-04-24 09:14:44.769898 |
115 |
35073903 |
CC ROAD FROM MAIN BRICKS BATS SOILING TO BIMALA SASMAL HOUSE AT DAKSHIN DHEKIA |
200203 |
CC ROAD FROM MAIN BRICKS BATS SOILING TO BIMALA SASMAL HOUSE AT DAKSHIN DHEKIA1 |
Plinth level |
-
latitude : 22.38961805,22.38962588,22.38962679
Longitude : 87.44001913,87.44004997,87.44012492
file name : Image_02022021094618402.png
|
2021-02-02 09:46:18.511399 |
116 |
35073903 |
CC ROAD FROM MAIN BRICKS BATS SOILING TO BIMALA SASMAL HOUSE AT DAKSHIN DHEKIA |
200203 |
CC ROAD FROM MAIN BRICKS BATS SOILING TO BIMALA SASMAL HOUSE AT DAKSHIN DHEKIA1 |
Completion of work |
-
latitude : 22.38963538,22.38963835,22.38964281
Longitude : 87.44002613,87.44002806,87.44003003
file name : Image_29122020171047909.png
|
2020-12-29 17:10:47.99892 |
117 |
35083189 |
CC DRAINFROM NITAI MIDYA HOUSE TO BAMUN DANGA AT SULTANPUR |
89709 |
CC DRAINFROM NITAI MIDYA HOUSE TO BAMUN DANGA AT SULTANPUR1 |
Plinth level |
-
latitude : 22.3991083,22.3991083,22.3991083
Longitude : 87.4771194,87.4771247,87.4771247
file name : Image_24042021112653316.png
|
2021-04-24 11:26:53.414443 |
118 |
35083189 |
CC DRAINFROM NITAI MIDYA HOUSE TO BAMUN DANGA AT SULTANPUR |
89709 |
CC DRAINFROM NITAI MIDYA HOUSE TO BAMUN DANGA AT SULTANPUR1 |
Completion of work |
-
latitude : 22.39811684,22.39806199,22.3981347
Longitude : 87.47693957,87.47692479,87.47692035
file name : Image_09022021131948712.png
|
2021-02-09 13:19:48.806448 |
119 |
35259630 |
CONST OF CONCRETE ROAD FROM ALOKA MANNA HOUSE TO SANJOY PRAMANIK HOUSE AT SAHARDA |
274276 |
CONST OF CONCRETE ROAD FROM ALOKA MANNA HOUSE TO SANJOY PRAMANIK HOUSE AT SAHARDA |
Roof laid |
-
latitude : 22.38325983,22.38323,22.38319991
Longitude : 87.4931149,87.49312453,87.49312262
file name : Image_24042021104354859.png
|
2021-04-24 10:43:54.958592 |
120 |
35259630 |
CONST OF CONCRETE ROAD FROM ALOKA MANNA HOUSE TO SANJOY PRAMANIK HOUSE AT SAHARDA |
274276 |
CONST OF CONCRETE ROAD FROM ALOKA MANNA HOUSE TO SANJOY PRAMANIK HOUSE AT SAHARDA |
Plinth level |
-
latitude : 22.38313553,22.3831586,22.38320592
Longitude : 87.49311792,87.49312706,87.49314189
file name : Image_23012021155021507.png
|
2021-01-23 15:50:21.625659 |
121 |
35259630 |
CONST OF CONCRETE ROAD FROM ALOKA MANNA HOUSE TO SANJOY PRAMANIK HOUSE AT SAHARDA |
274276 |
CONST OF CONCRETE ROAD FROM ALOKA MANNA HOUSE TO SANJOY PRAMANIK HOUSE AT SAHARDA |
Completion of work |
-
latitude : 22.38322312,22.38323655
Longitude : 87.4931069,87.49309654
file name : Image_19122020103611882.png
|
2020-12-19 10:36:11.986024 |
122 |
35079135 |
INSTALLATION OF SUBMERSIBLE PUMP AT BAMUN PARA AT AKRA |
129800 |
INSTALLATION OF SUBMERSIBLE PUMP AT BAMUN PARA AT AKRA1 |
Completion of work |
-
latitude : 22.39870463
Longitude : 87.46778168
file name : Image_09022021133633258.png
|
2021-02-09 13:36:33.380779 |
123 |
35195543 |
SINKING OF SUBMERSIBLE PUMP WITH PIPE LINE AT SURPARA AT RAMNAGAR |
149848 |
SINKING OF SUBMERSIBLE PUMP WITH PIPE LINE AT SURPARA AT RAMNAGAR1 |
Roof laid |
-
latitude : 22.42811623
Longitude : 87.48233207
file name : Image_04042022135616032.png
|
2022-04-04 13:56:16.163857 |
124 |
35195543 |
SINKING OF SUBMERSIBLE PUMP WITH PIPE LINE AT SURPARA AT RAMNAGAR |
149848 |
SINKING OF SUBMERSIBLE PUMP WITH PIPE LINE AT SURPARA AT RAMNAGAR1 |
Plinth level |
-
latitude : 22.42805034
Longitude : 87.48236608
file name : Image_26042021115908251.png
|
2021-04-26 11:59:08.357397 |
125 |
35195543 |
SINKING OF SUBMERSIBLE PUMP WITH PIPE LINE AT SURPARA AT RAMNAGAR |
149848 |
SINKING OF SUBMERSIBLE PUMP WITH PIPE LINE AT SURPARA AT RAMNAGAR1 |
Completion of work |
-
latitude : 22.42814035
Longitude : 87.48235963
file name : Image_10022021162536625.png
|
2021-02-10 16:25:36.672843 |
126 |
35288445 |
CC ROAD FROM N BHUNIA HOUSE TO MAJI PARA AT PELAGERIA |
200100 |
CC ROAD FROM N BHUNIA HOUSE TO MAJI PARA AT PELAGERIA1 |
Roof laid |
-
latitude : 22.3961922,22.39622287,22.39625497
Longitude : 87.45502706,87.45504042,87.45505725
file name : Image_24042021101609850.png
|
2021-04-24 10:16:09.935634 |
127 |
35288445 |
CC ROAD FROM N BHUNIA HOUSE TO MAJI PARA AT PELAGERIA |
200100 |
CC ROAD FROM N BHUNIA HOUSE TO MAJI PARA AT PELAGERIA1 |
Plinth level |
-
latitude : 22.3964719,22.3964736,22.3964736
Longitude : 87.4550028,87.4550076,87.4550076
file name : Image_14022021121610409.png
|
2021-02-14 12:16:10.48526 |
128 |
35288445 |
CC ROAD FROM N BHUNIA HOUSE TO MAJI PARA AT PELAGERIA |
200100 |
CC ROAD FROM N BHUNIA HOUSE TO MAJI PARA AT PELAGERIA1 |
Completion of work |
-
latitude : 22.39628272,22.39628306,22.39628142
Longitude : 87.4550818,87.45508326,87.45508549
file name : Image_29122020165832078.png
|
2020-12-29 16:58:32.174167 |
129 |
35068190 |
CC ROAD FROM HASINUDDIN HOUSE TO MIR ZAKIR HOUSE AT BEGUNIA |
248000 |
CC ROAD FROM HASINUDDIN HOUSE TO MIR ZAKIR HOUSE AT BEGUNIA 1 |
Roof laid |
-
latitude : 22.4115586,22.4115586,22.4115586
Longitude : 87.4778373,87.4778373,87.4778373
file name : Image_04042022131010107.png
|
2022-04-04 13:10:10.206058 |
130 |
35068190 |
CC ROAD FROM HASINUDDIN HOUSE TO MIR ZAKIR HOUSE AT BEGUNIA |
248000 |
CC ROAD FROM HASINUDDIN HOUSE TO MIR ZAKIR HOUSE AT BEGUNIA 1 |
Plinth level |
-
latitude : 22.4114,22.41139817,22.41137735
Longitude : 87.47781811,87.47777191,87.47782137
file name : Image_25092021111224323.png
|
2021-09-25 11:12:24.403106 |
131 |
35068190 |
CC ROAD FROM HASINUDDIN HOUSE TO MIR ZAKIR HOUSE AT BEGUNIA |
248000 |
CC ROAD FROM HASINUDDIN HOUSE TO MIR ZAKIR HOUSE AT BEGUNIA 1 |
Roof laid |
-
latitude : 22.41139116,22.41137758,22.41137943
Longitude : 87.47782217,87.47782208,87.47782538
file name : Image_25092021113130181.png
|
2021-09-25 11:31:30.296286 |
132 |
35068190 |
CC ROAD FROM HASINUDDIN HOUSE TO MIR ZAKIR HOUSE AT BEGUNIA |
248000 |
CC ROAD FROM HASINUDDIN HOUSE TO MIR ZAKIR HOUSE AT BEGUNIA 1 |
Completion of work |
-
latitude : 22.41140328,22.41140829
Longitude : 87.47779458,87.47780439
file name : Image_25092021110050898.png
|
2021-09-25 11:00:51.005665 |
133 |
35068190 |
CC ROAD FROM HASINUDDIN HOUSE TO MIR ZAKIR HOUSE AT BEGUNIA |
248000 |
CC ROAD FROM HASINUDDIN HOUSE TO MIR ZAKIR HOUSE AT BEGUNIA 1 |
Completion of work |
-
latitude : 22.4068013,22.4083432,22.4083432
Longitude : 87.4794331,87.4828371,87.4828371
file name : Image_28122020164640242.png
|
2020-12-28 16:46:40.364489 |
134 |
35280336 |
CC ROAD FROM MURLI GAYEN HOUSE TO SUMAN MANNA HOUSE AT BHAIRABPUR |
199100 |
CC ROAD FROM MURLI GAYEN HOUSE TO SUMAN MANNA HOUSE AT BHAIRABPUR1 |
Plinth level |
-
latitude : 22.38326596,22.38326251,22.38328914
Longitude : 87.45578648,87.45579235,87.45577971
file name : Image_30122021111541127.png
|
2021-12-30 11:15:41.231015 |
135 |
35280336 |
CC ROAD FROM MURLI GAYEN HOUSE TO SUMAN MANNA HOUSE AT BHAIRABPUR |
199100 |
CC ROAD FROM MURLI GAYEN HOUSE TO SUMAN MANNA HOUSE AT BHAIRABPUR1 |
Completion of work |
-
latitude : 22.38347838,22.38341268,22.38335811
Longitude : 87.45579641,87.4557745,87.45577102
file name : Image_30122021104553127.png
|
2021-12-30 10:45:53.291495 |
136 |
46868080 |
CONSTRUCTION OF PUCCA DRAIN FROM GOPAL MAJHI HOUSE TO JHANTU PATRA LAND AT MEUDIPUR |
216200 |
CONSTRUCTION OF PUCCA DRAIN FROM GOPAL MAJHI HOUSE TO JHANTU PATRA LAND AT MEUDIPUR1 |
Roof laid |
-
latitude : 22.42246373,22.42245954,22.42245917
Longitude : 87.47995241,87.47995819,87.4799756
file name : Image_04042022132802889.png
|
2022-04-04 13:28:02.979151 |
137 |
46868080 |
CONSTRUCTION OF PUCCA DRAIN FROM GOPAL MAJHI HOUSE TO JHANTU PATRA LAND AT MEUDIPUR |
216200 |
CONSTRUCTION OF PUCCA DRAIN FROM GOPAL MAJHI HOUSE TO JHANTU PATRA LAND AT MEUDIPUR1 |
Completion of work |
-
latitude : 22.42249534,22.4224953,22.42249444
Longitude : 87.48000893,87.48002095,87.48004578
file name : Image_01042022130821185.png
|
2022-04-01 13:08:21.267579 |
138 |
46868080 |
CONSTRUCTION OF PUCCA DRAIN FROM GOPAL MAJHI HOUSE TO JHANTU PATRA LAND AT MEUDIPUR |
216200 |
CONSTRUCTION OF PUCCA DRAIN FROM GOPAL MAJHI HOUSE TO JHANTU PATRA LAND AT MEUDIPUR1 |
Plinth level |
-
latitude : 22.42243846,22.42241298,22.42243543
Longitude : 87.48001347,87.48001566,87.48005034
file name : Image_01042022130928246.png
|
2022-04-01 13:09:28.343518 |
139 |
34746888 |
CONST OF CC ROAD FROM BAKA DULE HOUSE TO KARTIK LAYEK HOUSE AT MEUDIPUR |
279000 |
CONST OF CC ROAD FROM BAKA DULE HOUSE TO KARTIK LAYEK HOUSE AT MEUDIPUR1 |
Roof laid |
-
latitude : 22.42168105,22.42168318,22.4216994
Longitude : 87.48034139,87.48032023,87.4803408
file name : Image_30042021154729823.png
|
2021-04-30 15:47:29.931868 |
140 |
34746888 |
CONST OF CC ROAD FROM BAKA DULE HOUSE TO KARTIK LAYEK HOUSE AT MEUDIPUR |
279000 |
CONST OF CC ROAD FROM BAKA DULE HOUSE TO KARTIK LAYEK HOUSE AT MEUDIPUR1 |
Plinth level |
-
latitude : 22.42167748,22.42167878,22.42168404
Longitude : 87.48032247,87.48034038,87.48034964
file name : Image_24042021120215028.png
|
2021-04-24 12:02:15.171273 |
141 |
34746888 |
CONST OF CC ROAD FROM BAKA DULE HOUSE TO KARTIK LAYEK HOUSE AT MEUDIPUR |
279000 |
CONST OF CC ROAD FROM BAKA DULE HOUSE TO KARTIK LAYEK HOUSE AT MEUDIPUR1 |
Completion of work |
-
latitude : 22.42152696,22.42145407,22.42144674
Longitude : 87.48031244,87.48025629,87.48026303
file name : Image_10022021161835378.png
|
2021-02-10 16:18:35.431208 |
142 |
34746888 |
CONST OF CC ROAD FROM BAKA DULE HOUSE TO KARTIK LAYEK HOUSE AT MEUDIPUR |
279000 |
CONST OF CC ROAD FROM BAKA DULE HOUSE TO KARTIK LAYEK HOUSE AT MEUDIPUR1 |
Completion of work |
-
latitude : 22.42170124,22.42169684,22.42169702
Longitude : 87.48043207,87.48041425,87.48040094
file name : Image_28122020165711301.png
|
2020-12-28 16:57:11.431083 |
143 |
35069844 |
CON DRAIN FROM HAREN DHAL HOUSE TO BANESWAR DHAL AT RAMNAGAR |
170500 |
CON DRAIN FROM HAREN DHAL HOUSE TO BANESWAR DHAL AT RAMNAGAR1 |
Completion of work |
-
latitude : 22.42659353,22.42658322,22.42655076
Longitude : 87.48059951,87.48059357,87.48054955
file name : Image_29032022135403499.png
|
2022-03-29 13:54:03.637237 |
144 |
35069844 |
CON DRAIN FROM HAREN DHAL HOUSE TO BANESWAR DHAL AT RAMNAGAR |
170500 |
CON DRAIN FROM HAREN DHAL HOUSE TO BANESWAR DHAL AT RAMNAGAR1 |
Plinth level |
-
latitude : 22.42657487,22.42657492,22.42657436
Longitude : 87.4805446,87.48053089,87.4805185
file name : Image_29032022140233865.png
|
2022-03-29 14:02:33.950188 |
145 |
34744765 |
CONST OF PUCCA DRAIN WITH COVER FROM TAPAN DAS HOUSE TO ASHIS PAL POND AT RAMNAGA |
218200 |
CONST OF PUCCA DRAIN WITH COVER FROM TAPAN DAS HOUSE TO ASHIS PAL POND AT RAMNAGA1 |
Roof laid |
-
latitude : 22.42789892,22.42789701,22.42791539
Longitude : 87.48412434,87.48414261,87.48415572
file name : Image_04042022135234643.png
|
2022-04-04 13:52:34.748476 |
146 |
34744765 |
CONST OF PUCCA DRAIN WITH COVER FROM TAPAN DAS HOUSE TO ASHIS PAL POND AT RAMNAGA |
218200 |
CONST OF PUCCA DRAIN WITH COVER FROM TAPAN DAS HOUSE TO ASHIS PAL POND AT RAMNAGA1 |
Plinth level |
-
latitude : 22.42790928,22.42791895,22.42789183
Longitude : 87.48421953,87.48420899,87.4841717
file name : Image_29122021140559277.png
|
2021-12-29 14:05:59.391622 |
147 |
34744765 |
CONST OF PUCCA DRAIN WITH COVER FROM TAPAN DAS HOUSE TO ASHIS PAL POND AT RAMNAGA |
218200 |
CONST OF PUCCA DRAIN WITH COVER FROM TAPAN DAS HOUSE TO ASHIS PAL POND AT RAMNAGA1 |
Completion of work |
-
latitude : 22.42789953,22.42792149,22.42799396
Longitude : 87.48418559,87.48432027,87.48424609
file name : Image_29122021135217778.png
|
2021-12-29 13:52:17.900354 |
148 |
35176653 |
CC RODE FROM SUNIL DHAL HOUSE TO BASANTA DHAL HOUSE AT MEUDIPUR |
149810 |
CC RODE FROM SUNIL DHAL HOUSE TO BASANTA DHAL HOUSE AT MEUDIPUR1 |
Plinth level |
-
latitude : 22.42527562,22.42529789,22.42532923
Longitude : 87.48020023,87.48018999,87.48019653
file name : Image_25012022134809436.png
|
2022-01-25 13:48:09.551494 |
149 |
35176653 |
CC RODE FROM SUNIL DHAL HOUSE TO BASANTA DHAL HOUSE AT MEUDIPUR |
149810 |
CC RODE FROM SUNIL DHAL HOUSE TO BASANTA DHAL HOUSE AT MEUDIPUR1 |
Roof laid |
-
latitude : 22.42528742,22.42529724,22.42532945
Longitude : 87.48018865,87.48019893,87.48019936
file name : Image_25012022135401548.png
|
2022-01-25 13:54:01.664594 |
150 |
35270806 |
SUBMERSIBLE PUMP WITH PIPE LINE AT ADIBASI PARA AT AYMA |
183350 |
SUBMERSIBLE PUMP WITH PIPE LINE AT ADIBASI PARA AT AYMA1 |
Roof laid |
-
latitude : 22.41952816
Longitude : 87.44316623
file name : Image_05042022164208317.png
|
2022-04-05 16:42:08.437392 |
151 |
35270806 |
SUBMERSIBLE PUMP WITH PIPE LINE AT ADIBASI PARA AT AYMA |
183350 |
SUBMERSIBLE PUMP WITH PIPE LINE AT ADIBASI PARA AT AYMA1 |
Roof laid |
-
latitude : 22.41950781
Longitude : 87.44315532
file name : Image_29122021095930543.png
|
2021-12-29 09:59:30.658547 |
152 |
35270806 |
SUBMERSIBLE PUMP WITH PIPE LINE AT ADIBASI PARA AT AYMA |
183350 |
SUBMERSIBLE PUMP WITH PIPE LINE AT ADIBASI PARA AT AYMA1 |
Plinth level |
-
latitude : 22.41949152
Longitude : 87.4431287
file name : Image_29122021095546380.png
|
2021-12-29 09:55:46.507552 |
153 |
35270806 |
SUBMERSIBLE PUMP WITH PIPE LINE AT ADIBASI PARA AT AYMA |
183350 |
SUBMERSIBLE PUMP WITH PIPE LINE AT ADIBASI PARA AT AYMA1 |
Completion of work |
-
latitude : 22.41952055
Longitude : 87.44313733
file name : Image_29122021093918701.png
|
2021-12-29 09:39:18.80961 |
154 |
35054768 |
CC ROAD FROM RABIN DAS HOUSE TO INDRA SARKAR HOUSE AT AKRA |
205500 |
CC ROAD FROM RABIN DAS HOUSE TO INDRA SARKAR HOUSE AT AKRA1 |
Completion of work |
-
latitude : 22.39603929,22.3960643,22.39606161
Longitude : 87.46573507,87.46570373,87.46570154
file name : Image_31122021123320951.png
|
2021-12-31 12:33:21.066649 |
155 |
35065016 |
CONST OF PUCCA DRAIN WITH COVER FROM SK PIYAR ALI HOUSE TO HOSSAIN HOUSE AT CHOWPENIA |
116400 |
CONST OF PUCCA DRAIN WITH COVER FROM SK PIYAR ALI HOUSE TO HOSSAIN HOUSE AT CHOWPENIA1 |
Completion of work |
-
latitude : 22.41531213,22.41768791,22.41769097
Longitude : 87.47134995,87.47571927,87.47568949
file name : Image_28122021135429280.png
|
2021-12-28 13:54:29.401085 |
156 |
35072243 |
CC ROAD FROM MAIN ROAD TO DULAL DE HOUSE AT AKASHYA |
204100 |
CC ROAD FROM MAIN ROAD TO DULAL DE HOUSE AT AKASHYA1 |
Plinth level |
-
latitude : 22.39444221,22.394474,22.39448327
Longitude : 87.48558235,87.48558863,87.48556018
file name : Image_21122021133223686.png
|
2021-12-21 13:32:23.813369 |
157 |
35072243 |
CC ROAD FROM MAIN ROAD TO DULAL DE HOUSE AT AKASHYA |
204100 |
CC ROAD FROM MAIN ROAD TO DULAL DE HOUSE AT AKASHYA1 |
Completion of work |
-
latitude : 22.39440986,22.39440343,22.39445446
Longitude : 87.48557839,87.48556124,87.48553986
file name : Image_21122021130153995.png
|
2021-12-21 13:01:54.091182 |
158 |
35072243 |
CC ROAD FROM MAIN ROAD TO DULAL DE HOUSE AT AKASHYA |
204100 |
CC ROAD FROM MAIN ROAD TO DULAL DE HOUSE AT AKASHYA1 |
Completion of work |
-
latitude : 22.39448773,22.39449521,22.39445523
Longitude : 87.48556361,87.48555282,87.485561
file name : Image_21122021130034749.png
|
2021-12-21 13:00:34.869172 |
159 |
35271603 |
CC ROAD FROM KAT PUL TO SWAPAN ATTA HOUSE AT KANIKHA |
274800 |
CC ROAD FROM KAT PUL TO SWAPAN ATTA HOUSE AT KANIKHA1 |
Completion of work |
-
latitude : 22.38543585,22.38544913,22.38545569
Longitude : 87.4760099,87.47599623,87.47596308
file name : Image_22122021115340702.png
|
2021-12-22 11:53:40.830705 |
160 |
35267921 |
CONST OF CONCRETE ROAD FROM MAIN ROAD TO SING NAYEK PARA AT DURGAPUR |
258088 |
CONST OF CONCRETE ROAD FROM MAIN ROAD TO SING NAYEK PARA AT DURGAPUR1 |
Roof laid |
-
latitude : 22.38955128,22.38970128,22.38964109
Longitude : 87.46530394,87.46700986,87.46698555
file name : Image_30042021153320681.png
|
2021-04-30 15:33:20.791424 |
161 |
35267921 |
CONST OF CONCRETE ROAD FROM MAIN ROAD TO SING NAYEK PARA AT DURGAPUR |
258088 |
CONST OF CONCRETE ROAD FROM MAIN ROAD TO SING NAYEK PARA AT DURGAPUR1 |
Plinth level |
-
latitude : 22.38976303,22.38961035,22.38960337
Longitude : 87.46715437,87.46704604,87.46702627
file name : Image_10022021155025506.png
|
2021-02-10 15:50:25.639167 |
162 |
35267921 |
CONST OF CONCRETE ROAD FROM MAIN ROAD TO SING NAYEK PARA AT DURGAPUR |
258088 |
CONST OF CONCRETE ROAD FROM MAIN ROAD TO SING NAYEK PARA AT DURGAPUR1 |
Completion of work |
-
latitude : 22.3897941,22.38977636,22.38969686
Longitude : 87.46712721,87.46710923,87.46706816
file name : Image_21012021161810031.png
|
2021-01-21 16:18:10.12112 |
163 |
39125653 |
REPAIR OF TOILET AND URINAL OF GP OFFICE AT SULTANPUR MOUZA |
249850 |
REPAIR OF TOILET AND URINAL OF GP OFFICE AT SULTANPUR MOUZA1 |
Completion of work |
-
latitude : 22.39852981
Longitude : 87.47889283
file name : Image_16122021134620182.png
|
2021-12-16 13:46:20.265768 |
164 |
35280948 |
CC ROAD FROM P KALIARA RIVER EMB TO DHAL PARA AT KALIARA |
200100 |
CC ROAD FROM P KALIARA RIVER EMB TO DHAL PARA AT KALIARA1 |
Roof laid |
-
latitude : 22.39944329,22.39942106,22.39938528
Longitude : 87.44426508,87.44429688,87.44437612
file name : Image_24042021094347141.png
|
2021-04-24 09:43:47.257818 |
165 |
35280948 |
CC ROAD FROM P KALIARA RIVER EMB TO DHAL PARA AT KALIARA |
200100 |
CC ROAD FROM P KALIARA RIVER EMB TO DHAL PARA AT KALIARA1 |
Plinth level |
-
latitude : 22.39943757,22.3994021,22.39936291
Longitude : 87.44428883,87.44435361,87.44449552
file name : Image_22122020150917334.png
|
2020-12-22 15:09:17.422882 |
166 |
35280948 |
CC ROAD FROM P KALIARA RIVER EMB TO DHAL PARA AT KALIARA |
200100 |
CC ROAD FROM P KALIARA RIVER EMB TO DHAL PARA AT KALIARA1 |
Completion of work |
-
latitude : 22.39948698,22.39942176,22.39941628
Longitude : 87.44427246,87.44439897,87.44445208
file name : Image_19122020110253920.png
|
2020-12-19 11:02:54.004629 |
167 |
35287297 |
INSTALLATION OF TUBE WELL AT PANIFALA GANKAR PARA MARK II AT DURGAPUR EAST |
99400 |
INSTALLATION OF TUBE WELL AT PANIFALA GANKAR PARA MARK II AT DURGAPUR EAST1 |
Roof laid |
-
latitude : 22.40156216
Longitude : 87.47358986
file name : Image_04042022160440130.png
|
2022-04-04 16:04:40.251597 |
168 |
35287297 |
INSTALLATION OF TUBE WELL AT PANIFALA GANKAR PARA MARK II AT DURGAPUR EAST |
99400 |
INSTALLATION OF TUBE WELL AT PANIFALA GANKAR PARA MARK II AT DURGAPUR EAST1 |
Roof laid |
-
latitude : 22.40152004
Longitude : 87.47359066
file name : Image_10052021152735696.png
|
2021-05-10 15:27:35.797012 |
169 |
35287297 |
INSTALLATION OF TUBE WELL AT PANIFALA GANKAR PARA MARK II AT DURGAPUR EAST |
99400 |
INSTALLATION OF TUBE WELL AT PANIFALA GANKAR PARA MARK II AT DURGAPUR EAST1 |
Plinth level |
-
latitude : 22.40150908
Longitude : 87.47357559
file name : Image_10052021151653358.png
|
2021-05-10 15:16:53.453226 |
170 |
35287297 |
INSTALLATION OF TUBE WELL AT PANIFALA GANKAR PARA MARK II AT DURGAPUR EAST |
99400 |
INSTALLATION OF TUBE WELL AT PANIFALA GANKAR PARA MARK II AT DURGAPUR EAST1 |
Completion of work |
-
latitude : 22.40155896
Longitude : 87.47357472
file name : Image_10052021142931652.png
|
2021-05-10 14:29:31.746415 |
171 |
56338574 |
EXTENSION OF PIPE LINE FROM JOYDEV JANA HOUSE TO BASUDEV DEY HOUSE |
107106 |
EXTENSION OF PIPE LINE FROM JOYDEV JANA HOUSE TO BASUDEV DEY HOUSE1 |
Plinth level |
-
latitude : 22.39143715,22.39142728,22.39140255
Longitude : 87.47774173,87.47773712,87.47773967
file name : Image_17032023154843108.png
|
2023-03-17 15:48:43.230269 |
172 |
56338574 |
EXTENSION OF PIPE LINE FROM JOYDEV JANA HOUSE TO BASUDEV DEY HOUSE |
107106 |
EXTENSION OF PIPE LINE FROM JOYDEV JANA HOUSE TO BASUDEV DEY HOUSE1 |
Completion of work |
-
latitude : 22.395517,22.395517,22.395517
Longitude : 87.4784791,87.4784791,87.4784791
file name : Image_17032023154505499.png
|
2023-03-17 15:45:05.618529 |
173 |
46910422 |
INSTALLATION OF SUBMERSIBLE PUMP WITH WATER TANK AND PIPE LINE NEAR PASCHIM PARA AT BEGUNIA |
300000 |
INSTALLATION OF SUBMERSIBLE PUMP WITH WATER TANK AND PIPE LINE NEAR PASCHIM PARA AT BEGUNIA1 |
Completion of work |
-
latitude : 22.41068011
Longitude : 87.47716814
file name : Image_04042022161658016.png
|
2022-04-04 16:16:58.113003 |
174 |
46910422 |
INSTALLATION OF SUBMERSIBLE PUMP WITH WATER TANK AND PIPE LINE NEAR PASCHIM PARA AT BEGUNIA |
300000 |
INSTALLATION OF SUBMERSIBLE PUMP WITH WATER TANK AND PIPE LINE NEAR PASCHIM PARA AT BEGUNIA1 |
Plinth level |
-
latitude : 22.41067384
Longitude : 87.47716801
file name : Image_04042022163113712.png
|
2022-04-04 16:31:13.811524 |
175 |
46869734 |
CONSTRUCTION OF PUCCA DRAIN FROM PELAGERIA ASIM DAS HOUSE TO TAPAN PATAR LAND AT PELAGERIA |
249920 |
CONSTRUCTION OF PUCCA DRAIN FROM PELAGERIA ASIM DAS HOUSE TO TAPAN PATAR LAND AT PELAGERIA1 |
Plinth level |
-
latitude : 22.39329421,22.39329079,22.39328981
Longitude : 87.44542043,87.44539481,87.44535916
file name : Image_20052022153304456.png
|
2022-05-20 15:33:04.554918 |
176 |
46869734 |
CONSTRUCTION OF PUCCA DRAIN FROM PELAGERIA ASIM DAS HOUSE TO TAPAN PATAR LAND AT PELAGERIA |
249920 |
CONSTRUCTION OF PUCCA DRAIN FROM PELAGERIA ASIM DAS HOUSE TO TAPAN PATAR LAND AT PELAGERIA1 |
Completion of work |
-
latitude : 22.39327662,22.39327722,22.39328231
Longitude : 87.4453957,87.4453898,87.44529208
file name : Image_20052022152831718.png
|
2022-05-20 15:28:31.825063 |
177 |
46869734 |
CONSTRUCTION OF PUCCA DRAIN FROM PELAGERIA ASIM DAS HOUSE TO TAPAN PATAR LAND AT PELAGERIA |
249920 |
CONSTRUCTION OF PUCCA DRAIN FROM PELAGERIA ASIM DAS HOUSE TO TAPAN PATAR LAND AT PELAGERIA1 |
Roof laid |
-
latitude : 22.3933116,22.39330755,22.39331251,22.39331779
Longitude : 87.44539035,87.44536819,87.44536229,87.44532113
file name : Image_20052022153435093.png
|
2022-05-20 15:34:35.195779 |
178 |
46779657 |
CONSTRUCTION OF CONCRETE ROAD FROM OKRA RIVER BANDH TO MADHU PATRA HOUSE AT OKRA |
281400 |
CONSTRUCTION OF CONCRETE ROAD FROM OKRA RIVER BANDH TO MADHU PATRA HOUSE AT OKRA1 |
Plinth level |
-
latitude : 22.39938959,22.39937433,22.39937682,22.39936169
Longitude : 87.46781922,87.46781742,87.46784706,87.46781906
file name : Image_24052022141445233.png
|
2022-05-24 14:14:45.334208 |
179 |
46779657 |
CONSTRUCTION OF CONCRETE ROAD FROM OKRA RIVER BANDH TO MADHU PATRA HOUSE AT OKRA |
281400 |
CONSTRUCTION OF CONCRETE ROAD FROM OKRA RIVER BANDH TO MADHU PATRA HOUSE AT OKRA1 |
Completion of work |
-
latitude : 22.3984546,22.3974976,22.3974976
Longitude : 87.4790162,87.4786956,87.4786956
file name : Image_19052022130149375.png
|
2022-05-19 13:01:49.478007 |
180 |
46778199 |
CONSTRUCTION OF CONCRETE ROAD FROM PAIR ALI HOUSE TO AJIMUDDIN HOUSE AT MAHESHPUR |
306100 |
CONSTRUCTION OF CONCRETE ROAD FROM PAIR ALI HOUSE TO AJIMUDDIN HOUSE AT MAHESHPUR1 |
Roof laid |
-
latitude : 22.44108888,22.44105406,22.44102486
Longitude : 87.47793122,87.47793453,87.47792675
file name : Image_26092022162331682.png
|
2022-09-26 16:23:31.778314 |
181 |
46778199 |
CONSTRUCTION OF CONCRETE ROAD FROM PAIR ALI HOUSE TO AJIMUDDIN HOUSE AT MAHESHPUR |
306100 |
CONSTRUCTION OF CONCRETE ROAD FROM PAIR ALI HOUSE TO AJIMUDDIN HOUSE AT MAHESHPUR1 |
Plinth level |
-
latitude : 22.44110343,22.44109162,22.44105772
Longitude : 87.47793711,87.47795644,87.47795221
file name : Image_26092022161607224.png
|
2022-09-26 16:16:07.321877 |
182 |
46778199 |
CONSTRUCTION OF CONCRETE ROAD FROM PAIR ALI HOUSE TO AJIMUDDIN HOUSE AT MAHESHPUR |
306100 |
CONSTRUCTION OF CONCRETE ROAD FROM PAIR ALI HOUSE TO AJIMUDDIN HOUSE AT MAHESHPUR1 |
Completion of work |
-
latitude : 22.44104743,22.44103451,22.44097226
Longitude : 87.47792952,87.47792472,87.47793439
file name : Image_26092022161428180.png
|
2022-09-26 16:14:28.277748 |
183 |
46909247 |
CONSTRUCTION OF COMMUNITY TOILET AT MADPUR GHAT BAZAR AT DAKSHIN DEKIA |
349800 |
CONSTRUCTION OF COMMUNITY TOILET AT MADPUR GHAT BAZAR AT DAKSHIN DEKIA1 |
Completion of work |
-
latitude : 22.3882252
Longitude : 87.4404528
file name : Image_20032023173027862.png
|
2023-03-20 17:30:27.952888 |
184 |
46909247 |
CONSTRUCTION OF COMMUNITY TOILET AT MADPUR GHAT BAZAR AT DAKSHIN DEKIA |
349800 |
CONSTRUCTION OF COMMUNITY TOILET AT MADPUR GHAT BAZAR AT DAKSHIN DEKIA1 |
Plinth level |
-
latitude : 22.38801897
Longitude : 87.44105117
file name : Image_20032023173307959.png
|
2023-03-20 17:33:08.041688 |
185 |
46909247 |
CONSTRUCTION OF COMMUNITY TOILET AT MADPUR GHAT BAZAR AT DAKSHIN DEKIA |
349800 |
CONSTRUCTION OF COMMUNITY TOILET AT MADPUR GHAT BAZAR AT DAKSHIN DEKIA1 |
Roof laid |
-
latitude : 22.3880174
Longitude : 87.44107594
file name : Image_20032023173820192.png
|
2023-03-20 17:38:20.284687 |
186 |
56338193 |
INSTALLATION OF SUB MERSIBLE PUMP AT BEGUNIA PRY SCHOOL |
130176 |
INSTALLATION OF SUB MERSIBLE PUMP AT BEGUNIA PRY SCHOOL1 |
Plinth level |
-
latitude : 22.4106328
Longitude : 87.4797701
file name : Image_27032023171113704.png
|
2023-03-27 17:11:13.794845 |
187 |
56338193 |
INSTALLATION OF SUB MERSIBLE PUMP AT BEGUNIA PRY SCHOOL |
130176 |
INSTALLATION OF SUB MERSIBLE PUMP AT BEGUNIA PRY SCHOOL1 |
Completion of work |
-
latitude : 22.4106331
Longitude : 87.4797708
file name : Image_22032023163148465.png
|
2023-03-22 16:31:48.572362 |
188 |
56338777 |
INSTALLATION OF SUBMERSIBLE PUMP WITH PIPELINE NEAR PRAKASH DEY HOUSE AT SAHARDA |
120740 |
INSTALLATION OF SUBMERSIBLE PUMP WITH PIPELINE NEAR PRAKASH DEY HOUSE AT SAHARDA1 |
Completion of work |
-
latitude : 22.38252795
Longitude : 87.49431212
file name : Image_27032023171326359.png
|
2023-03-27 17:13:26.450221 |
189 |
56338777 |
INSTALLATION OF SUBMERSIBLE PUMP WITH PIPELINE NEAR PRAKASH DEY HOUSE AT SAHARDA |
120740 |
INSTALLATION OF SUBMERSIBLE PUMP WITH PIPELINE NEAR PRAKASH DEY HOUSE AT SAHARDA1 |
Plinth level |
-
latitude : 22.38254638
Longitude : 87.49431126
file name : Image_27032023171809634.png
|
2023-03-27 17:18:09.742306 |
190 |
67927232 |
Drainage Construction |
152692 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.3926506
Longitude : 87.4703466
file name : Image_28122023175201258.png
|
2023-12-28 17:52:01.386028 |
191 |
67927232 |
Drainage Construction |
152692 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.3926506
Longitude : 87.4703466
file name : Image_28122023174709620.png
|
2023-12-28 17:47:09.83784 |
192 |
56337393 |
INSTALLATION OF SUB MERSIBLE PUMP WITH WATER TANK AT CHOWPENIA PRY SCHOOL |
146138 |
INSTALLATION OF SUB MERSIBLE PUMP WITH WATER TANK AT CHOWPENIA PRY SCHOOL1 |
Completion of work |
-
latitude : 22.41515035
Longitude : 87.48633464
file name : Image_30032023161756296.png
|
2023-03-30 16:17:56.387634 |
193 |
66361015 |
Any other operation and maintenance needs related to solid waste management |
375081 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 22.38857758
Longitude : 87.45607904
file name : Image_30032023172210770.png
|
2023-03-30 17:22:10.934242 |
194 |
66361015 |
Any other operation and maintenance needs related to solid waste management |
375081 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 22.38858955
Longitude : 87.45608296
file name : Image_30032023171948015.png
|
2023-03-30 17:19:48.113785 |
195 |
66361015 |
Any other operation and maintenance needs related to solid waste management |
375081 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 22.38857904
Longitude : 87.45608538
file name : Image_30032023171807322.png
|
2023-03-30 17:18:07.413217 |
196 |
59069027 |
CONST OF CONCRETE ROAD FROM AKASHYA CONCRETE ROAD TO SAJAL DHARA PROJECT 15TH UNTIED FUND |
250609 |
CONST OF CONCRETE ROAD FROM AKASHYA CONCRETE ROAD TO SAJAL DHARA PROJECT 15TH UNTIED FUND1 |
Completion of work |
-
latitude : 22.3977245,22.3977245,22.3977245
Longitude : 87.4790654,87.4790654,87.4790654
file name : Image_30032023162749914.png
|
2023-03-30 16:27:50.014074 |
197 |
59069027 |
CONST OF CONCRETE ROAD FROM AKASHYA CONCRETE ROAD TO SAJAL DHARA PROJECT 15TH UNTIED FUND |
250609 |
CONST OF CONCRETE ROAD FROM AKASHYA CONCRETE ROAD TO SAJAL DHARA PROJECT 15TH UNTIED FUND1 |
Plinth level |
-
latitude : 22.3969944,22.3969944,22.3969944
Longitude : 87.478942,87.478942,87.478942
file name : Image_30032023162952291.png
|
2023-03-30 16:29:52.382986 |
198 |
59069027 |
CONST OF CONCRETE ROAD FROM AKASHYA CONCRETE ROAD TO SAJAL DHARA PROJECT 15TH UNTIED FUND |
250609 |
CONST OF CONCRETE ROAD FROM AKASHYA CONCRETE ROAD TO SAJAL DHARA PROJECT 15TH UNTIED FUND1 |
Roof laid |
-
latitude : 22.3969558,22.3969558,22.3969558
Longitude : 87.4789724,87.4789724,87.4789724
file name : Image_30032023163145597.png
|
2023-03-30 16:31:45.685571 |
199 |
66362336 |
Creation of community compost pits for a group of Households |
102582 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 22.38854238
Longitude : 87.45637393
file name : Image_30032023172810878.png
|
2023-03-30 17:28:10.966845 |
200 |
66362336 |
Creation of community compost pits for a group of Households |
102582 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 22.38851042
Longitude : 87.45633216
file name : Image_30032023172340256.png
|
2023-03-30 17:23:40.34927 |
201 |
47237514 |
INSTALLATION OF SUBMERSIBLE PUMP WITH TANK AT BHAIRABPUR SSK |
149177 |
INSTALLATION OF SUBMERSIBLE PUMP WITH TANK AT BHAIRABPUR SSK1 |
Completion of work |
-
latitude : 22.38303722
Longitude : 87.45917755
file name : Image_31032023105625804.png
|
2023-03-31 10:56:25.89789 |
202 |
47237514 |
INSTALLATION OF SUBMERSIBLE PUMP WITH TANK AT BHAIRABPUR SSK |
149177 |
INSTALLATION OF SUBMERSIBLE PUMP WITH TANK AT BHAIRABPUR SSK1 |
Plinth level |
-
latitude : 22.38302154
Longitude : 87.45918
file name : Image_31032023110152214.png
|
2023-03-31 11:01:52.301574 |
203 |
56346923 |
INSTALLATION OF SUBMERSIBLE PUMP NEAR PELAGERIA LIBRARY AT PELAGERIA |
158122 |
INSTALLATION OF SUBMERSIBLE PUMP NEAR PELAGERIA LIBRARY AT PELAGERIA 1 |
Completion of work |
-
latitude : 22.3940955
Longitude : 87.4546782
file name : Image_10042023112113740.png
|
2023-04-10 11:21:13.827981 |
204 |
56346923 |
INSTALLATION OF SUBMERSIBLE PUMP NEAR PELAGERIA LIBRARY AT PELAGERIA |
158122 |
INSTALLATION OF SUBMERSIBLE PUMP NEAR PELAGERIA LIBRARY AT PELAGERIA 1 |
Plinth level |
-
latitude : 22.3940955
Longitude : 87.454679
file name : Image_10042023112603110.png
|
2023-04-10 11:26:03.206564 |
205 |
56338071 |
CONST OF DRAIN FROM MIR JAKIR HOUSE TO MAIN ROAD |
199548 |
CONST OF DRAIN FROM MIR JAKIR HOUSE TO MAIN ROAD1 |
Plinth level |
-
latitude : 22.4120683,22.41206904,22.41206094
Longitude : 87.47781757,87.47780285,87.4778188
file name : Image_13042023105512136.png
|
2023-04-13 10:55:12.22782 |
206 |
56338071 |
CONST OF DRAIN FROM MIR JAKIR HOUSE TO MAIN ROAD |
199548 |
CONST OF DRAIN FROM MIR JAKIR HOUSE TO MAIN ROAD1 |
Completion of work |
-
latitude : 22.38790407,22.41196056,22.41206744
Longitude : 87.45245273,87.47791962,87.47782648
file name : Image_13042023104930626.png
|
2023-04-13 10:49:30.724528 |
207 |
56338008 |
CONST OF DRAIN FROM MANIK DE LAND TO D ED COLLAGE AT MEUDIPUR |
143043 |
CONST OF DRAIN FROM MANIK DE LAND TO D ED COLLAGE AT MEUDIPUR1 |
Completion of work |
-
latitude : 22.42223057,22.42219909,22.42220173
Longitude : 87.47883461,87.47883623,87.47884787
file name : Image_03052023134244837.png
|
2023-05-03 13:42:44.938244 |
208 |
56338008 |
CONST OF DRAIN FROM MANIK DE LAND TO D ED COLLAGE AT MEUDIPUR |
143043 |
CONST OF DRAIN FROM MANIK DE LAND TO D ED COLLAGE AT MEUDIPUR1 |
Plinth level |
-
latitude : 22.42216354,22.4221596,22.42215983
Longitude : 87.47881722,87.47882912,87.47884205
file name : Image_03052023134737572.png
|
2023-05-03 13:47:37.668269 |
209 |
46870743 |
SINKING OF SUBMERSIBLE PUMP WITH PIPELINE NEAR BENIMADHAB DE HOUSE AT BHAIRABPUR |
194453 |
SINKING OF SUBMERSIBLE PUMP WITH PIPELINE NEAR BENIMADHAB DE HOUSE AT BHAIRABPUR1 |
Completion of work |
-
latitude : 22.38147583
Longitude : 87.46087755
file name : Image_28042023103823309.png
|
2023-04-28 10:38:23.405326 |
210 |
46870743 |
SINKING OF SUBMERSIBLE PUMP WITH PIPELINE NEAR BENIMADHAB DE HOUSE AT BHAIRABPUR |
194453 |
SINKING OF SUBMERSIBLE PUMP WITH PIPELINE NEAR BENIMADHAB DE HOUSE AT BHAIRABPUR1 |
Plinth level |
-
latitude : 22.38149264
Longitude : 87.46088224
file name : Image_28042023104355105.png
|
2023-04-28 10:43:55.215231 |
211 |
46870743 |
SINKING OF SUBMERSIBLE PUMP WITH PIPELINE NEAR BENIMADHAB DE HOUSE AT BHAIRABPUR |
194453 |
SINKING OF SUBMERSIBLE PUMP WITH PIPELINE NEAR BENIMADHAB DE HOUSE AT BHAIRABPUR1 |
Roof laid |
-
latitude : 22.38147167
Longitude : 87.46084199
file name : Image_28042023104906724.png
|
2023-04-28 10:49:06.821797 |
212 |
56347695 |
INSTALLATION OF SUBMERSIBLE WITH TANK AT DAKSHIN DHEKIA SSK |
172759 |
INSTALLATION OF SUBMERSIBLE WITH TANK AT DAKSHIN DHEKIA SSK1 |
Completion of work |
-
latitude : 22.38966119
Longitude : 87.43950396
file name : Image_20042023114035857.png
|
2023-04-20 11:40:35.964851 |
213 |
56347695 |
INSTALLATION OF SUBMERSIBLE WITH TANK AT DAKSHIN DHEKIA SSK |
172759 |
INSTALLATION OF SUBMERSIBLE WITH TANK AT DAKSHIN DHEKIA SSK1 |
Plinth level |
-
latitude : 22.38967007
Longitude : 87.43954067
file name : Image_20042023114310154.png
|
2023-04-20 11:43:10.337746 |
214 |
56491247 |
INSTALLATION OF SUBMERSIBLE PUMP WITH TANK AT KALIARA AGRANI SSK AT KALIARA |
111259 |
INSTALLATION OF SUBMERSIBLE PUMP WITH TANK AT KALIARA AGRANI SSK AT KALIARA1 |
Completion of work |
-
latitude : 22.40250749
Longitude : 87.44584643
file name : Image_20042023115029623.png
|
2023-04-20 11:50:29.715161 |
215 |
56491247 |
INSTALLATION OF SUBMERSIBLE PUMP WITH TANK AT KALIARA AGRANI SSK AT KALIARA |
111259 |
INSTALLATION OF SUBMERSIBLE PUMP WITH TANK AT KALIARA AGRANI SSK AT KALIARA1 |
Plinth level |
-
latitude : 22.40248992
Longitude : 87.44581847
file name : Image_20042023115231934.png
|
2023-04-20 11:52:32.057796 |
216 |
56338492 |
CONST OF WATER TANK WITH PIPELINE AT AKASHYA ST PARA |
106605 |
CONST OF WATER TANK WITH PIPELINE AT AKASHYA ST PARA1 |
Plinth level |
-
latitude : 22.39689309
Longitude : 87.48740761
file name : Image_15052023112146271.png
|
2023-05-15 11:21:46.359266 |
217 |
56338492 |
CONST OF WATER TANK WITH PIPELINE AT AKASHYA ST PARA |
106605 |
CONST OF WATER TANK WITH PIPELINE AT AKASHYA ST PARA1 |
Completion of work |
-
latitude : 22.39687012
Longitude : 87.48742631
file name : Image_15052023111727406.png
|
2023-05-15 11:17:27.500841 |
218 |
56338613 |
INSTALLATION OF SUB MERSIIBLE PUMP WITH TANK AT MEUDICHAK SSK |
146321 |
INSTALLATION OF SUB MERSIIBLE PUMP WITH TANK AT MEUDICHAK SSK1 |
Plinth level |
-
latitude : 22.39129567
Longitude : 87.47843733
file name : Image_15052023113032036.png
|
2023-05-15 11:30:32.118828 |
219 |
56338613 |
INSTALLATION OF SUB MERSIIBLE PUMP WITH TANK AT MEUDICHAK SSK |
146321 |
INSTALLATION OF SUB MERSIIBLE PUMP WITH TANK AT MEUDICHAK SSK1 |
Completion of work |
-
latitude : 22.3970581
Longitude : 87.4788627
file name : Image_15052023112704310.png
|
2023-05-15 11:27:04.40136 |
220 |
56338458 |
CONST OF DRAIN FROM ASHADUL SHOP TO AKRAM HOUSE AT SULTANPUR |
250051 |
CONST OF DRAIN FROM ASHADUL SHOP TO AKRAM HOUSE AT SULTANPUR1 |
Completion of work |
-
latitude : 22.4078633,22.40786425,22.40786905
Longitude : 87.48028271,87.48028673,87.48028876
file name : Image_22052023163841802.png
|
2023-05-22 16:38:41.89834 |
221 |
59540764 |
EXTENSION OF PIPELINE FROM DAS PARA MDTW TO LAND OF SWAPAN PAL AT MEUDIPUR |
199980 |
EXTENSION OF PIPELINE FROM DAS PARA MDTW TO LAND OF SWAPAN PAL AT MEUDIPUR1 |
Roof laid |
-
latitude : 22.42376169,22.42377086,22.42377779
Longitude : 87.48047647,87.48046349,87.48046182
file name : Image_07062023172637222.png
|
2023-06-07 17:26:37.314855 |
222 |
59540764 |
EXTENSION OF PIPELINE FROM DAS PARA MDTW TO LAND OF SWAPAN PAL AT MEUDIPUR |
199980 |
EXTENSION OF PIPELINE FROM DAS PARA MDTW TO LAND OF SWAPAN PAL AT MEUDIPUR1 |
Plinth level |
-
latitude : 22.42373629,22.42373623,22.42373623
Longitude : 87.48049795,87.48049816,87.48049816
file name : Image_07062023172434436.png
|
2023-06-07 17:24:34.529355 |
223 |
59540764 |
EXTENSION OF PIPELINE FROM DAS PARA MDTW TO LAND OF SWAPAN PAL AT MEUDIPUR |
199980 |
EXTENSION OF PIPELINE FROM DAS PARA MDTW TO LAND OF SWAPAN PAL AT MEUDIPUR1 |
Completion of work |
-
latitude : 22.42372875,22.42372782,22.42373793
Longitude : 87.4804691,87.48047485,87.48047515
file name : Image_07062023171822073.png
|
2023-06-07 17:18:22.168761 |
224 |
56488660 |
INSTALLATION OF SUBMERSIBLE AT KULIARA MALLICK PARA |
145533 |
INSTALLATION OF SUBMERSIBLE AT KULIARA MALLICK PARA1 |
Completion of work |
-
latitude : 22.41506884
Longitude : 87.47468871
file name : Image_09062023145747193.png
|
2023-06-09 14:57:47.285726 |
225 |
46909780 |
EXTENTION OF PIPE LINE OF HARI DANGA MOBARAK ALI PARA AND PATI PARA AT SULTANPUR |
75773 |
EXTENTION OF PIPE LINE OF HARI DANGA MOBARAK ALI PARA AND PATI PARA AT SULTANPUR1 |
Roof laid |
-
latitude : 22.40485649,22.40487617,22.40488259
Longitude : 87.47896526,87.4789673,87.47896648
file name : Image_09062023132710215.png
|
2023-06-09 13:27:10.31776 |
226 |
46909780 |
EXTENTION OF PIPE LINE OF HARI DANGA MOBARAK ALI PARA AND PATI PARA AT SULTANPUR |
75773 |
EXTENTION OF PIPE LINE OF HARI DANGA MOBARAK ALI PARA AND PATI PARA AT SULTANPUR1 |
Plinth level |
-
latitude : 22.40482026,22.40482343,22.4048409
Longitude : 87.47897371,87.4789699,87.47896616
file name : Image_09062023132305013.png
|
2023-06-09 13:23:05.194849 |
227 |
46909780 |
EXTENTION OF PIPE LINE OF HARI DANGA MOBARAK ALI PARA AND PATI PARA AT SULTANPUR |
75773 |
EXTENTION OF PIPE LINE OF HARI DANGA MOBARAK ALI PARA AND PATI PARA AT SULTANPUR1 |
Completion of work |
-
latitude : 22.39409055,22.40475162,22.404818
Longitude : 87.45475181,87.4789454,87.47893966
file name : Image_09062023130851318.png
|
2023-06-09 13:08:51.415965 |
228 |
59063405 |
RENOVATION OF GRAM PANCHAYAT BUILDING 15TH UNTIED FUND |
199881 |
RENOVATION OF GRAM PANCHAYAT BUILDING 15TH UNTIED FUND1 |
Completion of work |
-
latitude : 22.398463
Longitude : 87.4791151
file name : Image_24062023163640195.png
|
2023-06-24 16:36:40.285554 |
229 |
59072647 |
CONST OF CONCRETE ROAD FROM BLACK TOP ROAD TO UTTAM GHORAI HOUSE AT SULTANPUR 15TH UNTIED |
249990 |
CONST OF CONCRETE ROAD FROM BLACK TOP ROAD TO UTTAM GHORAI HOUSE AT SULTANPUR 15TH UNTIED1 |
Completion of work |
-
latitude : 22.40650409,22.40650444,22.40650719
Longitude : 87.4864161,87.48643837,87.48645191
file name : Image_09082023110454135.png
|
2023-08-09 11:04:54.267988 |
230 |
59129642 |
CONST OF CONCRETE ROAD FROM GOPINATH DAS ADHIKARI HOUSE NIMAI SHIT HOUSE AT BOGDIHI 15TH UNTIED FUND |
250774 |
CONST OF CONCRETE ROAD FROM GOPINATH DAS ADHIKARI HOUSE NIMAI SHIT HOUSE AT BOGDIHI 15TH UNTIED FUND1 |
Completion of work |
-
latitude : 22.38190152,22.38184397,22.38182291
Longitude : 87.48978138,87.48986254,87.48988219
file name : Image_01082023135152403.png
|
2023-08-01 13:51:52.50535 |
231 |
47233045 |
CONSTRUCTION OF PUCCA DRAIN FROM FAKIR SAREN LAND TO CANEL AT DAKSHIN DHEKIA |
109767 |
CONSTRUCTION OF PUCCA DRAIN FROM FAKIR SAREN LAND TO CANEL AT DAKSHIN DHEKIA1 |
Completion of work |
-
latitude : 22.39259369
Longitude : 87.44499361
file name : Image_08082023141656013.png
|
2023-08-08 14:16:56.094183 |
232 |
59163677 |
REPAIR OF BOULDER DRAIN AT AYMA 15TH UNTIED FUND |
261122 |
REPAIR OF BOULDER DRAIN AT AYMA 15TH UNTIED FUND1 |
Plinth level |
-
latitude : 22.41404918
Longitude : 87.44875618
file name : Image_30102023163623012.png
|
2023-10-30 16:36:23.105873 |
233 |
59163677 |
REPAIR OF BOULDER DRAIN AT AYMA 15TH UNTIED FUND |
261122 |
REPAIR OF BOULDER DRAIN AT AYMA 15TH UNTIED FUND1 |
Completion of work |
-
latitude : 22.41403853
Longitude : 87.44880216
file name : Image_30102023163133624.png
|
2023-10-30 16:31:33.72027 |
234 |
67929817 |
Creation of a new source of drinking water |
149238 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.38167976
Longitude : 87.4901742
file name : Image_18012024120319573.png
|
2024-01-18 12:03:19.674204 |
235 |
67929817 |
Creation of a new source of drinking water |
149238 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.3851193
Longitude : 87.4570074
file name : Image_12012024172804819.png
|
2024-01-12 17:28:04.946731 |
236 |
67929817 |
Creation of a new source of drinking water |
149238 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.38166105
Longitude : 87.49018235
file name : Image_14102023141820161.png
|
2023-10-14 14:18:20.246611 |
237 |
67929817 |
Creation of a new source of drinking water |
149238 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.38169426
Longitude : 87.49020758
file name : Image_14102023140918988.png
|
2023-10-14 14:09:19.067727 |
238 |
67929817 |
Creation of a new source of drinking water |
149238 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.38162399
Longitude : 87.49015326
file name : Image_12092023115136662.png
|
2023-09-12 11:51:36.841886 |
239 |
56346720 |
INSTALLATION OF SUB MERSIBLE PUMP WITH PIPELINE AT PELAGERIA DAS PARA |
150825 |
INSTALLATION OF SUB MERSIBLE PUMP WITH PIPELINE AT PELAGERIA DAS PARA1 |
Roof laid |
-
latitude : 22.39647763
Longitude : 87.45670669
file name : Image_14102023144430479.png
|
2023-10-14 14:44:30.568475 |
240 |
56346720 |
INSTALLATION OF SUB MERSIBLE PUMP WITH PIPELINE AT PELAGERIA DAS PARA |
150825 |
INSTALLATION OF SUB MERSIBLE PUMP WITH PIPELINE AT PELAGERIA DAS PARA1 |
Plinth level |
-
latitude : 22.39648181
Longitude : 87.45676208
file name : Image_14102023143952686.png
|
2023-10-14 14:39:52.777674 |
241 |
56346720 |
INSTALLATION OF SUB MERSIBLE PUMP WITH PIPELINE AT PELAGERIA DAS PARA |
150825 |
INSTALLATION OF SUB MERSIBLE PUMP WITH PIPELINE AT PELAGERIA DAS PARA1 |
Completion of work |
-
latitude : 22.39650003
Longitude : 87.45674976
file name : Image_14102023143456238.png
|
2023-10-14 14:34:56.343394 |
242 |
56300565 |
INSTALLATION OF SUB MERSIBLE PUMP NEAR CHOWPENIA NAJRUL ISLAM HOUSE |
150825 |
INSTALLATION OF SUB MERSIBLE PUMP NEAR CHOWPENIA NAJRUL ISLAM HOUSE1 |
Completion of work |
-
latitude : 22.41612447
Longitude : 87.4765786
file name : Image_11102023152610111.png
|
2023-10-11 15:26:10.21563 |
243 |
67929454 |
Any other operation and maintenance needs related to solid waste management |
92637 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 22.3851204
Longitude : 87.4569993
file name : Image_18012024114903032.png
|
2024-01-18 11:49:03.119552 |
244 |
67929454 |
Any other operation and maintenance needs related to solid waste management |
92637 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 22.3851209
Longitude : 87.4570065
file name : Image_12012024173025596.png
|
2024-01-12 17:30:25.695732 |
245 |
67929454 |
Any other operation and maintenance needs related to solid waste management |
92637 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 22.38850669
Longitude : 87.45648305
file name : Image_17102023170721215.png
|
2023-10-17 17:07:21.32076 |
246 |
67929454 |
Any other operation and maintenance needs related to solid waste management |
92637 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 22.38852318
Longitude : 87.45646111
file name : Image_17102023170439154.png
|
2023-10-17 17:04:39.24841 |
247 |
67929454 |
Any other operation and maintenance needs related to solid waste management |
92637 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 22.38851902
Longitude : 87.45647082
file name : Image_17102023170126911.png
|
2023-10-17 17:01:27.011297 |
248 |
67925612 |
Functional Equipment |
72000 |
Functional Equipment1 |
|
-
latitude : 22.3984342
Longitude : 87.4790235
file name : Image_05012024122609345.png
|
2024-01-05 12:26:09.451541 |
249 |
67926254 |
Drainage Construction |
282556 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.3984232
Longitude : 87.479011
file name : Image_15012024124337889.png
|
2024-01-15 12:43:37.981724 |
250 |
67926254 |
Drainage Construction |
282556 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.400341
Longitude : 87.4797699
file name : Image_05012024125951677.png
|
2024-01-05 12:59:51.760163 |
251 |
67926364 |
Drainage Construction |
167647 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.43752234
Longitude : 87.48304057
file name : Image_10012024165032290.png
|
2024-01-10 16:50:32.38567 |
252 |
67926364 |
Drainage Construction |
167647 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.43749518
Longitude : 87.48302969
file name : Image_10012024164633748.png
|
2024-01-10 16:46:33.845389 |
253 |
67926364 |
Drainage Construction |
167647 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.43750625
Longitude : 87.48304647
file name : Image_10012024164301388.png
|
2024-01-10 16:43:01.479577 |
254 |
67930034 |
Augmentation of existing sources of Drinking Water |
267011 |
Augmentation of existing sources of Drinking Water1 |
Roof laid |
-
latitude : 22.39074492
Longitude : 87.47759717
file name : Image_19012024161747593.png
|
2024-01-19 16:17:47.689685 |
255 |
67930034 |
Augmentation of existing sources of Drinking Water |
267011 |
Augmentation of existing sources of Drinking Water1 |
Plinth level |
-
latitude : 22.39071066
Longitude : 87.47758588
file name : Image_10012024141438151.png
|
2024-01-10 14:14:38.24033 |
256 |
67930034 |
Augmentation of existing sources of Drinking Water |
267011 |
Augmentation of existing sources of Drinking Water1 |
Completion of work |
-
latitude : 22.39072874
Longitude : 87.4775682
file name : Image_10012024140356548.png
|
2024-01-10 14:03:56.638689 |
257 |
67875915 |
Drainage Construction |
200990 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.4148601
Longitude : 87.4419822
file name : Image_11012024114006335.png
|
2024-01-11 11:40:06.429767 |
258 |
67875915 |
Drainage Construction |
200990 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.4148589
Longitude : 87.4419813
file name : Image_11012024113307758.png
|
2024-01-11 11:33:07.857916 |
259 |
67929960 |
Creation of a new source of drinking water |
249767 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.3897195
Longitude : 87.48477858
file name : Image_19012024161206717.png
|
2024-01-19 16:12:06.814718 |
260 |
67929960 |
Creation of a new source of drinking water |
249767 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.38971132
Longitude : 87.48481027
file name : Image_19012024160930970.png
|
2024-01-19 16:09:31.078769 |
261 |
67929960 |
Creation of a new source of drinking water |
249767 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.38971655
Longitude : 87.48478593
file name : Image_19012024160636752.png
|
2024-01-19 16:06:36.859812 |
262 |
59712949 |
CONST OF COMMUNITY TOILET AT BAR BASANTAPUR MINI MARKET |
280975 |
CONST OF COMMUNITY TOILET AT BAR BASANTAPUR MINI MARKET1 |
Plinth level |
-
latitude : 22.3896464
Longitude : 87.48521104
file name : Image_08122023134242353.png
|
2023-12-08 13:42:42.453197 |
263 |
59712949 |
CONST OF COMMUNITY TOILET AT BAR BASANTAPUR MINI MARKET |
280975 |
CONST OF COMMUNITY TOILET AT BAR BASANTAPUR MINI MARKET1 |
Completion of work |
-
latitude : 22.3954539
Longitude : 87.4781468
file name : Image_08122023133533826.png
|
2023-12-08 13:35:33.929833 |
264 |
59062644 |
RENOVATION OF GRAM PANCHAYAT MEETTING HALL 15TH UNTIED |
296852 |
RENOVATION OF GRAM PANCHAYAT MEETTING HALL 15TH UNTIED1 |
Plinth level |
-
latitude : 22.3984503
Longitude : 87.478977
file name : Image_13122023165241175.png
|
2023-12-13 16:52:41.270268 |
265 |
59062644 |
RENOVATION OF GRAM PANCHAYAT MEETTING HALL 15TH UNTIED |
296852 |
RENOVATION OF GRAM PANCHAYAT MEETTING HALL 15TH UNTIED1 |
Completion of work |
-
latitude : 22.3984325
Longitude : 87.4790092
file name : Image_13122023164951000.png
|
2023-12-13 16:49:51.099304 |
266 |
56501768 |
CONSTRUCTION OF DRAIN FROM SK RAJU ALI HOUSE TO SK AKHTAR ALI HOUSE |
322866 |
CONSTRUCTION OF DRAIN FROM SK RAJU ALI HOUSE TO SK AKHTAR ALI HOUSE1 |
Completion of work |
-
latitude : 22.3941357,22.3941357,22.3941357
Longitude : 87.4532482,87.4532482,87.4532482
file name : Image_15122023155620673.png
|
2023-12-15 15:56:20.763537 |
267 |
67925303 |
Construction of roads |
250570 |
Construction of roads1 |
Plinth level |
-
latitude : 22.3800101,22.3800101,22.38013557
Longitude : 87.4560906,87.4560906,87.45591128
file name : Image_19122023131239077.png
|
2023-12-19 13:12:39.199504 |
268 |
67925303 |
Construction of roads |
250570 |
Construction of roads1 |
Completion of work |
-
latitude : 22.3802057,22.3802057,22.3802057
Longitude : 87.4558944,87.4558944,87.4558944
file name : Image_19122023120954497.png
|
2023-12-19 12:09:54.595563 |
269 |
67929898 |
Purchase of water testing kit |
18900 |
Purchase of water testing kit1 |
Plinth level |
-
latitude : 22.3984932
Longitude : 87.4790399
file name : Image_21032024172204907.png
|
2024-03-21 17:22:04.995298 |
270 |
67929898 |
Purchase of water testing kit |
18900 |
Purchase of water testing kit1 |
Completion of work |
-
latitude : 22.3984926
Longitude : 87.4790419
file name : Image_21032024171834846.png
|
2024-03-21 17:18:34.938928 |
271 |
67929800 |
Piped water supply to HH |
104314 |
Piped water supply to HH1 |
Plinth level |
-
latitude : 22.38297589
Longitude : 87.49432551
file name : Image_21122023155000559.png
|
2023-12-21 15:50:00.658034 |
272 |
67929800 |
Piped water supply to HH |
104314 |
Piped water supply to HH1 |
Completion of work |
-
latitude : 22.392968
Longitude : 87.485645
file name : Image_21122023154216553.png
|
2023-12-21 15:42:16.655953 |
273 |
67929934 |
Piped water supply to HH |
99506 |
Piped water supply to HH1 |
Plinth level |
-
latitude : 22.3960509
Longitude : 87.4573491
file name : Image_21122023170227647.png
|
2023-12-21 17:02:27.746807 |
274 |
67929934 |
Piped water supply to HH |
99506 |
Piped water supply to HH1 |
Completion of work |
-
latitude : 22.3984186
Longitude : 87.479017
file name : Image_21122023164419669.png
|
2023-12-21 16:44:20.970963 |
275 |
67929800 |
Piped water supply to HH |
104314 |
Piped water supply to HH2 |
Plinth level |
-
latitude : 22.38631445
Longitude : 87.49382547
file name : Image_21122023155750048.png
|
2023-12-21 15:57:50.149634 |
276 |
67929800 |
Piped water supply to HH |
104314 |
Piped water supply to HH2 |
Completion of work |
-
latitude : 22.38627568
Longitude : 87.4938862
file name : Image_21122023155252290.png
|
2023-12-21 15:52:52.394405 |
277 |
67926603 |
Construction of Retaining Walls |
84513 |
Construction of Retaining Walls1 |
Roof laid |
-
latitude : 22.38410033,22.38410135,22.38409195
Longitude : 87.47398475,87.47398655,87.47397601
file name : Image_11032024164406710.png
|
2024-03-11 16:44:06.826944 |
278 |
67926603 |
Construction of Retaining Walls |
84513 |
Construction of Retaining Walls1 |
Plinth level |
-
latitude : 22.38412225,22.3841223,22.38412016
Longitude : 87.47396188,87.47397199,87.47398103
file name : Image_11032024164148843.png
|
2024-03-11 16:41:48.955271 |
279 |
67926603 |
Construction of Retaining Walls |
84513 |
Construction of Retaining Walls1 |
Completion of work |
-
latitude : 22.3851387,22.38409519,22.38412097
Longitude : 87.45701619,87.47399118,87.47398035
file name : Image_11032024163518711.png
|
2024-03-11 16:35:18.81567 |
280 |
67929777 |
Tap water connections to households |
251368 |
Tap water connections to households1 |
Plinth level |
-
latitude : 22.38475205
Longitude : 87.45862021
file name : Image_23052024080021195.png
|
2024-05-23 08:00:21.273949 |
281 |
67929777 |
Tap water connections to households |
251368 |
Tap water connections to households1 |
Completion of work |
-
latitude : 22.38477404
Longitude : 87.45858491
file name : Image_21052024113504244.png
|
2024-05-21 11:35:04.338962 |
282 |
67929777 |
Tap water connections to households |
251368 |
Tap water connections to households2 |
Plinth level |
-
latitude : 22.38478146
Longitude : 87.4586415
file name : Image_23052024080307158.png
|
2024-05-23 08:03:07.239356 |
283 |
67929777 |
Tap water connections to households |
251368 |
Tap water connections to households2 |
Completion of work |
-
latitude : 22.3847911
Longitude : 87.4586635
file name : Image_23052024074831276.png
|
2024-05-23 07:48:31.360649 |
284 |
67929777 |
Tap water connections to households |
251368 |
Tap water connections to households3 |
Plinth level |
-
latitude : 22.38476163
Longitude : 87.45862709
file name : Image_23052024080404301.png
|
2024-05-23 08:04:04.379593 |
285 |
67929777 |
Tap water connections to households |
251368 |
Tap water connections to households3 |
Completion of work |
-
latitude : 22.38476528
Longitude : 87.45864993
file name : Image_23052024074929669.png
|
2024-05-23 07:49:29.753091 |
286 |
67929777 |
Tap water connections to households |
251368 |
Tap water connections to households4 |
Plinth level |
-
latitude : 22.38476923
Longitude : 87.45861906
file name : Image_23052024080453868.png
|
2024-05-23 08:04:53.950944 |
287 |
67929777 |
Tap water connections to households |
251368 |
Tap water connections to households4 |
Completion of work |
-
latitude : 22.38477347
Longitude : 87.45862146
file name : Image_23052024075012053.png
|
2024-05-23 07:50:12.137435 |
288 |
67929777 |
Tap water connections to households |
251368 |
Tap water connections to households5 |
Plinth level |
-
latitude : 22.38476238
Longitude : 87.45861301
file name : Image_23052024080538933.png
|
2024-05-23 08:05:39.012173 |
289 |
67929777 |
Tap water connections to households |
251368 |
Tap water connections to households5 |
Completion of work |
-
latitude : 22.38479529
Longitude : 87.4586303
file name : Image_23052024075059747.png
|
2024-05-23 07:50:59.830957 |
290 |
67929840 |
Creation of a new source of drinking water |
251077 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.387973
Longitude : 87.4406138
file name : Image_14032024091848137.png
|
2024-03-14 09:18:48.216757 |
291 |
67929840 |
Creation of a new source of drinking water |
251077 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.38778163
Longitude : 87.44041971
file name : Image_14032024091434495.png
|
2024-03-14 09:14:34.582346 |
292 |
67924812 |
Construction of roads |
212289 |
Construction of roads1 |
Roof laid |
-
latitude : 22.38882669,22.38881968,22.38879461
Longitude : 87.4882427,87.48823828,87.48824226
file name : Image_13052024172627982.png
|
2024-05-13 17:26:28.075174 |
293 |
67924812 |
Construction of roads |
212289 |
Construction of roads1 |
Plinth level |
-
latitude : 22.38879906,22.38876299
Longitude : 87.48826594,87.48826684
file name : Image_13052024172124888.png
|
2024-05-13 17:21:24.972383 |
294 |
67924812 |
Construction of roads |
212289 |
Construction of roads1 |
Completion of work |
-
latitude : 22.42218992,22.38870437,22.38864687
Longitude : 87.47759693,87.48822487,87.48826398
file name : Image_16032024124219400.png
|
2024-03-16 12:42:19.485418 |
295 |
67924711 |
Construction of roads |
252354 |
Construction of roads1 |
Plinth level |
-
latitude : 22.41822653,22.41821438,22.41818739
Longitude : 87.47766537,87.47766639,87.47765583
file name : Image_14032024124921984.png
|
2024-03-14 12:49:22.090277 |
296 |
67924711 |
Construction of roads |
252354 |
Construction of roads1 |
Completion of work |
-
latitude : 22.41817537,22.41818658,22.41819129
Longitude : 87.47768483,87.47768869,87.47768966
file name : Image_14032024124429804.png
|
2024-03-14 12:44:29.899452 |
297 |
67926447 |
Drainage Construction |
267054 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.4002392
Longitude : 87.4811132
file name : Image_15032024143832797.png
|
2024-03-15 14:38:32.894009 |
298 |
67926447 |
Drainage Construction |
267054 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.3984385
Longitude : 87.4791538
file name : Image_15032024143316828.png
|
2024-03-15 14:33:16.91785 |
299 |
67921387 |
Construction of roads |
97012 |
Construction of roads1 |
Roof laid |
-
latitude : 22.41472174,22.41472671,22.41473428
Longitude : 87.47773775,87.47773907,87.47773891
file name : Image_12062024130057412.png
|
2024-06-12 13:01:00.432693 |
300 |
67921387 |
Construction of roads |
97012 |
Construction of roads1 |
Plinth level |
-
latitude : 22.41476462,22.41476089,22.41475199
Longitude : 87.47773499,87.47773657,87.47772742
file name : Image_12062024125646888.png
|
2024-06-12 12:56:47.139467 |
301 |
67921387 |
Construction of roads |
97012 |
Construction of roads1 |
Completion of work |
-
latitude : 22.41474383,22.41473182,22.4147264
Longitude : 87.47769506,87.47770339,87.47770613
file name : Image_16032024121937227.png
|
2024-03-16 12:19:37.32262 |
302 |
67926112 |
Drainage Construction |
252947 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.42230141
Longitude : 87.47762774
file name : Image_31052024121645703.png
|
2024-05-31 12:16:45.800222 |
303 |
67926112 |
Drainage Construction |
252947 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.42229814
Longitude : 87.47758028
file name : Image_31052024121348683.png
|
2024-05-31 12:13:48.78083 |
304 |
67926112 |
Drainage Construction |
252947 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.42227051
Longitude : 87.47764508
file name : Image_31052024121050327.png
|
2024-05-31 12:10:50.421332 |
305 |
67924227 |
Construction and repairing of Gate doors, window, fixtures etc. |
242152 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Roof laid |
-
latitude : 22.4106499
Longitude : 87.4796819
file name : Image_31052024120318047.png
|
2024-05-31 12:03:18.145298 |
306 |
67924227 |
Construction and repairing of Gate doors, window, fixtures etc. |
242152 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Plinth level |
-
latitude : 22.41034181
Longitude : 87.47982216
file name : Image_31052024115619037.png
|
2024-05-31 11:56:19.13661 |
307 |
67924227 |
Construction and repairing of Gate doors, window, fixtures etc. |
242152 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Completion of work |
-
latitude : 22.4106553
Longitude : 87.4796931
file name : Image_31052024114918683.png
|
2024-05-31 11:49:18.784045 |
308 |
67924227 |
Construction and repairing of Gate doors, window, fixtures etc. |
242152 |
Construction and repairing of Gate doors, window, fixtures etc.1 |
Completion of work |
-
latitude : 22.4106556
Longitude : 87.4797097
file name : Image_16032024121932533.png
|
2024-03-16 12:19:32.623616 |
309 |
67921436 |
Construction of roads |
292421 |
Construction of roads1 |
Roof laid |
-
latitude : 22.42806318,22.42805902,22.42804122
Longitude : 87.48422108,87.4842217,87.48422453
file name : Image_20122023165950987.png
|
2023-12-20 16:59:51.133479 |
310 |
67921436 |
Construction of roads |
292421 |
Construction of roads1 |
Plinth level |
-
latitude : 22.42804427,22.42801812,22.42799681
Longitude : 87.48420624,87.48421608,87.48422029
file name : Image_20122023165651662.png
|
2023-12-20 16:56:51.75174 |
311 |
67921436 |
Construction of roads |
292421 |
Construction of roads1 |
Completion of work |
-
latitude : 22.42811256,22.42809858,22.42808557
Longitude : 87.48421934,87.48422299,87.48422673
file name : Image_20122023164612193.png
|
2023-12-20 16:46:12.349087 |
312 |
67924979 |
Construction of roads |
131306 |
Construction of roads1 |
Plinth level |
-
latitude : 22.39124719,22.39125028
Longitude : 87.43992593,87.43991189
file name : Image_21122023104158512.png
|
2023-12-21 10:41:58.613201 |
313 |
67924979 |
Construction of roads |
131306 |
Construction of roads1 |
Completion of work |
-
latitude : 22.39128793,22.39128332,22.39128157
Longitude : 87.43998098,87.43998614,87.43994222
file name : Image_21122023103909017.png
|
2023-12-21 10:39:09.107114 |
314 |
67929910 |
Creation of a new source of drinking water |
249767 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.38970014
Longitude : 87.48479955
file name : Image_20012024151332892.png
|
2024-01-20 15:13:32.98316 |
315 |
67929910 |
Creation of a new source of drinking water |
249767 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.38970563
Longitude : 87.48481694
file name : Image_20012024151102336.png
|
2024-01-20 15:11:02.426998 |
316 |
67929910 |
Creation of a new source of drinking water |
249767 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.38972276
Longitude : 87.48480199
file name : Image_20012024150745165.png
|
2024-01-20 15:07:45.259138 |
317 |
67871681 |
Upgradation of Separate toilets for girls and boys in schools |
42592 |
Upgradation of Separate toilets for girls and boys in schools1 |
Roof laid |
-
latitude : 22.39949163
Longitude : 87.48290851
file name : Image_25062024171729858.png
|
2024-06-25 17:17:29.939559 |
318 |
67871681 |
Upgradation of Separate toilets for girls and boys in schools |
42592 |
Upgradation of Separate toilets for girls and boys in schools1 |
Plinth level |
-
latitude : 22.3994449
Longitude : 87.4824895
file name : Image_25062024171411811.png
|
2024-06-25 17:14:11.926165 |
319 |
67871681 |
Upgradation of Separate toilets for girls and boys in schools |
42592 |
Upgradation of Separate toilets for girls and boys in schools1 |
Completion of work |
-
latitude : 22.3994385
Longitude : 87.4824887
file name : Image_25062024170937885.png
|
2024-06-25 17:09:37.967918 |
320 |
67924369 |
Construction of roads |
335684 |
Construction of roads1 |
Plinth level |
-
latitude : 22.39550655,22.39550109,22.395471
Longitude : 87.453124,87.45313269,87.45313849
file name : Image_27062024120706781.png
|
2024-06-27 12:07:06.879373 |
321 |
67924369 |
Construction of roads |
335684 |
Construction of roads1 |
Completion of work |
-
latitude : 22.3955451,22.39553402,22.3955778
Longitude : 87.45314335,87.45313827,87.4531526
file name : Image_15032024172739273.png
|
2024-03-15 17:27:39.366469 |
322 |
67929934 |
Piped water supply to HH |
99506 |
Piped water supply to HH2 |
Plinth level |
-
latitude : 22.3960509
Longitude : 87.4573491
file name : Image_21122023170534014.png
|
2023-12-21 17:05:34.116748 |
323 |
67929934 |
Piped water supply to HH |
99506 |
Piped water supply to HH2 |
Plinth level |
-
latitude : 22.3960509
Longitude : 87.4573491
file name : Image_21122023170523984.png
|
2023-12-21 17:05:24.341318 |
324 |
67929934 |
Piped water supply to HH |
99506 |
Piped water supply to HH2 |
Completion of work |
-
latitude : 22.3984186
Longitude : 87.479017
file name : Image_21122023164754583.png
|
2023-12-21 16:47:55.66908 |
325 |
67929971 |
Creation of a new source of drinking water |
250975 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.39949705
Longitude : 87.48311659
file name : Image_16072024183853759.png
|
2024-07-16 18:38:53.846635 |
326 |
67929971 |
Creation of a new source of drinking water |
250975 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.3994614
Longitude : 87.4824796
file name : Image_16072024183622128.png
|
2024-07-16 18:36:22.210621 |
327 |
67929971 |
Creation of a new source of drinking water |
250975 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.3994614
Longitude : 87.4824796
file name : Image_16072024182706456.png
|
2024-07-16 18:27:06.545833 |
328 |
89077902 |
Construction of roads |
232946 |
Construction of roads1 |
Plinth level |
-
latitude : 22.39263,22.392620000000004,22.39261333333333
Longitude : 87.45079333333334,87.45079666666668,87.45082666666667
file name : Image_11112024141617376.png
|
2024-11-11 14:16:17.489882 |
329 |
89077902 |
Construction of roads |
232946 |
Construction of roads1 |
Completion of work |
-
latitude : 22.392621666666667,22.39263,22.392615
Longitude : 87.45078666666669,87.45079833333332,87.45081166666665
file name : Image_11112024141135364.png
|
2024-11-11 14:11:35.471563 |
330 |
89077843 |
Construction of roads |
244509 |
Construction of roads1 |
Plinth level |
-
latitude : 22.398675000000004,22.398675000000004
Longitude : 87.45181333333333,87.45181333333333
file name : Image_11112024142932420.png
|
2024-11-11 14:29:32.52247 |
331 |
89077843 |
Construction of roads |
244509 |
Construction of roads1 |
Completion of work |
-
latitude : 22.398694999999996,22.398678333333336,22.398688333333332
Longitude : 87.45196499999999,87.45192166666666,87.45185333333332
file name : Image_11112024142439106.png
|
2024-11-11 14:24:39.227718 |
332 |
67924422 |
Construction of roads |
252538 |
Construction of roads1 |
Plinth level |
-
latitude : 22.38879742,22.38879742,22.38878792
Longitude : 87.47519081,87.47520005,87.47521656
file name : Image_27122023165353975.png
|
2023-12-27 16:53:54.068433 |
333 |
67924422 |
Construction of roads |
252538 |
Construction of roads1 |
Completion of work |
-
latitude : 22.38887246,22.38885955,22.38884024
Longitude : 87.47517055,87.47517731,87.47520951
file name : Image_27122023164625262.png
|
2023-12-27 16:46:25.355218 |
334 |
67876548 |
Purchase of equipment (including safety equipment) for waste management |
257400 |
Purchase of equipment (including safety equipment) for waste management1 |
|
-
latitude : 22.3984779
Longitude : 87.4790629
file name : Image_31072024114359143.png
|
2024-07-31 11:43:59.249523 |
335 |
67930002 |
Piped water supply to HH |
49281 |
Piped water supply to HH1 |
Roof laid |
-
latitude : 22.3885043
Longitude : 87.4761319
file name : Image_25042024175827241.png
|
2024-04-25 17:58:27.329233 |
336 |
67930002 |
Piped water supply to HH |
49281 |
Piped water supply to HH1 |
Plinth level |
-
latitude : 22.3885067
Longitude : 87.4761328
file name : Image_25042024175658816.png
|
2024-04-25 17:56:58.909097 |
337 |
67930002 |
Piped water supply to HH |
49281 |
Piped water supply to HH1 |
Plinth level |
-
latitude : 22.3885071
Longitude : 87.4761307
file name : Image_25042024174524546.png
|
2024-04-25 17:45:24.649697 |
338 |
67930002 |
Piped water supply to HH |
49281 |
Piped water supply to HH1 |
Completion of work |
-
latitude : 22.38850228
Longitude : 87.47626949
file name : Image_13032024120158637.png
|
2024-03-13 12:01:59.155201 |
339 |
89056200 |
Pipeline connection for water supply |
214580 |
Pipeline connection for water supply1 |
Completion of work |
-
latitude : 22.422058
Longitude : 87.4797721
file name : Image_16112024113236870.png
|
2024-11-16 11:32:36.953918 |
340 |
89057561 |
Pipeline connection for water supply |
149773 |
Pipeline connection for water supply1 |
Plinth level |
-
latitude : 22.381933333333336
Longitude : 87.45984500000002
file name : Image_12112024112327608.png
|
2024-11-12 11:23:27.692548 |
341 |
89057561 |
Pipeline connection for water supply |
149773 |
Pipeline connection for water supply1 |
Completion of work |
-
latitude : 22.381935
Longitude : 87.45980666666668
file name : Image_12112024110904434.png
|
2024-11-12 11:09:04.535724 |
342 |
89056472 |
Pipeline connection for water supply |
162743 |
Pipeline connection for water supply1 |
Completion of work |
-
latitude : 22.404428333333332
Longitude : 87.47794166666667
file name : Image_16112024113421282.png
|
2024-11-16 11:34:21.379927 |