1 |
35375264 |
C of Statue Shed at JKD Athletics and Eucalyptus Balla Piling works on Southern Sidepond at Jagatpur |
220000 |
C of Statue Shed at JKD Athletics and Eucalyptus Balla Piling works on Southern Sidepond at Jagatpur1 |
Completion of work |
-
latitude : 22.10973301
Longitude : 87.39295257
file name : Image_15012021081717972.png
|
2021-01-15 08:17:18.069616 |
2 |
35303803 |
Construction of RCC Spun Pipe Culvert Near Saljora Crematoriun Burning Ghat at Saljora |
623964 |
Construction of RCC Spun Pipe Culvert Near Saljora Crematoriun Burning Ghat at Saljora1 |
Roof laid |
-
latitude : 22.09233093,22.09232876
Longitude : 87.4000339,87.40003546
file name : Image_10052021070824265.png
|
2021-05-10 07:08:24.362956 |
3 |
35303803 |
Construction of RCC Spun Pipe Culvert Near Saljora Crematoriun Burning Ghat at Saljora |
623964 |
Construction of RCC Spun Pipe Culvert Near Saljora Crematoriun Burning Ghat at Saljora1 |
Plinth level |
-
latitude : 22.0923777,22.09238001
Longitude : 87.40001162,87.40001527
file name : Image_12042021123308227.png
|
2021-04-12 12:33:08.326864 |
4 |
35303803 |
Construction of RCC Spun Pipe Culvert Near Saljora Crematoriun Burning Ghat at Saljora |
623964 |
Construction of RCC Spun Pipe Culvert Near Saljora Crematoriun Burning Ghat at Saljora1 |
Completion of work |
-
latitude : 22.09231873,22.09234198
Longitude : 87.40010339,87.40010513
file name : Image_21012021134125520.png
|
2021-01-21 13:41:25.644021 |
5 |
67631843 |
Drinking water facility |
217787 |
Drinking water facility1 |
Roof laid |
-
latitude : 22.13182826
Longitude : 87.36829082
file name : Image_16062024172202976.png
|
2024-06-16 17:22:03.054991 |
6 |
67631843 |
Drinking water facility |
217787 |
Drinking water facility1 |
Plinth level |
-
latitude : 22.13181186
Longitude : 87.36836347
file name : Image_16062024171852814.png
|
2024-06-16 17:18:52.887291 |
7 |
67631843 |
Drinking water facility |
217787 |
Drinking water facility1 |
Completion of work |
-
latitude : 22.13185142
Longitude : 87.36829351
file name : Image_16062024165208271.png
|
2024-06-16 16:52:08.357473 |
8 |
35078975 |
CC RD From Tegeria Sitala Mandir to House of Laxmikanta Das at Tegeria CFCG BG |
311971 |
CC RD From Tegeria Sitala Mandir to House of Laxmikanta Das at Tegeria CFCG BG1 |
Roof laid |
-
latitude : 22.12181474,22.12180962
Longitude : 87.36342379,87.36342552
file name : Image_31012022154408046.png
|
2022-01-31 15:44:08.173979 |
9 |
35078975 |
CC RD From Tegeria Sitala Mandir to House of Laxmikanta Das at Tegeria CFCG BG |
311971 |
CC RD From Tegeria Sitala Mandir to House of Laxmikanta Das at Tegeria CFCG BG1 |
Plinth level |
-
latitude : 22.12175289,22.12175692
Longitude : 87.36339839,87.36339658
file name : Image_31012022153918404.png
|
2022-01-31 15:39:18.548492 |
10 |
35078975 |
CC RD From Tegeria Sitala Mandir to House of Laxmikanta Das at Tegeria CFCG BG |
311971 |
CC RD From Tegeria Sitala Mandir to House of Laxmikanta Das at Tegeria CFCG BG1 |
Completion of work |
-
latitude : 22.12179359,22.12179116
Longitude : 87.36340699,87.36340688
file name : Image_28012022164856043.png
|
2022-01-28 16:48:56.324488 |
11 |
49260061 |
Repair of Tubewell |
660000 |
Repair of Tubewell1 |
Completion of work |
-
latitude : 22.1164042
Longitude : 87.3706982
file name : Image_21032022131924492.png
|
2022-03-21 13:19:24.582567 |
12 |
49245973 |
Construction of Concrete Road from Dhobonia Srikanta Ghorai to Samadhi Tala at Jagatpu |
303471 |
Construction of Concrete Road from Dhobonia Srikanta Ghorai to Samadhi Tala at Jagatpu1 |
Completion of work |
-
latitude : 22.1074657,22.1074657
Longitude : 87.38933005,87.38933005
file name : Image_13042022133615100.png
|
2022-04-13 13:36:15.216292 |
13 |
49246528 |
Construction of Submerssible With Walir Tank & Pipe Line at Biribari Village under Bakhrabad Gram Pa |
295250 |
Construction of Submerssible With Walir Tank & Pipe Line at Biribari Village under Bakhrabad Gram Pa1 |
Completion of work |
-
latitude : 22.11977846
Longitude : 87.37526258
file name : Image_04072022124115603.png
|
2022-07-04 12:41:15.711969 |
14 |
49246528 |
Construction of Submerssible With Walir Tank & Pipe Line at Biribari Village under Bakhrabad Gram Pa |
295250 |
Construction of Submerssible With Walir Tank & Pipe Line at Biribari Village under Bakhrabad Gram Pa1 |
Plinth level |
-
latitude : 22.11978281
Longitude : 87.37526131
file name : Image_04072022125201473.png
|
2022-07-04 12:52:01.604019 |
15 |
49246528 |
Construction of Submerssible With Walir Tank & Pipe Line at Biribari Village under Bakhrabad Gram Pa |
295250 |
Construction of Submerssible With Walir Tank & Pipe Line at Biribari Village under Bakhrabad Gram Pa1 |
Roof laid |
-
latitude : 22.11972278
Longitude : 87.37526643
file name : Image_04072022125428940.png
|
2022-07-04 12:54:29.054486 |
16 |
35243413 |
Repair of ctw under Bakhrabad 1 no Sansad 14th CFC |
400000 |
Repair of ctw under Bakhrabad 1 no Sansad 14th CFC1 |
Completion of work |
-
latitude : 22.0636578
Longitude : 87.3457195
file name : Image_18072022145654712.png
|
2022-07-18 14:56:54.82632 |
17 |
49251869 |
Construction of Submerssible With Walir Tank & Pipe Line at Gharbank Mansa Mandir at Gharbank |
295235 |
Construction of Submerssible With Walir Tank & Pipe Line at Gharbank Mansa Mandir at Gharbank1 |
Completion of work |
-
latitude : 22.11165416
Longitude : 87.40460474
file name : Image_29092022164447179.png
|
2022-09-29 16:44:47.283359 |
18 |
49251869 |
Construction of Submerssible With Walir Tank & Pipe Line at Gharbank Mansa Mandir at Gharbank |
295235 |
Construction of Submerssible With Walir Tank & Pipe Line at Gharbank Mansa Mandir at Gharbank1 |
Plinth level |
-
latitude : 22.11163145
Longitude : 87.40452583
file name : Image_28102022122050537.png
|
2022-10-28 12:20:50.646681 |
19 |
65492755 |
Creation of a new source of drinking water |
353662 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.10996303
Longitude : 87.39330199
file name : Image_08022023084346049.png
|
2023-02-08 08:43:46.126475 |
20 |
65492728 |
Creation of a new source of drinking water |
333662 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.08308983
Longitude : 87.3951944
file name : Image_15022023141719633.png
|
2023-02-15 14:17:19.721397 |
21 |
49246489 |
Construction of Submerssible With Walir Tank & Pipe Line at Bisharpur at Dakhin Korkora Sansad |
290000 |
Construction of Submerssible With Walir Tank & Pipe Line at Bisharpur at Dakhin Korkora Sansad1 |
Completion of work |
-
latitude : 22.11075941
Longitude : 87.38190126
file name : Image_07022023110719916.png
|
2023-02-07 11:07:19.994513 |
22 |
65492785 |
Creation of a new source of drinking water |
367324 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.1188322
Longitude : 87.3691879
file name : Image_15022023141713014.png
|
2023-02-15 14:17:13.10598 |
23 |
65491934 |
Construction of Culvert at Sarsa |
93534 |
Construction of Culvert at Sarsa1 |
Completion of work |
-
latitude : 22.07988835,22.07988686
Longitude : 87.39789705,87.39790003
file name : Image_30012023144234462.png
|
2023-01-30 14:42:34.538413 |
24 |
65491732 |
Repair of Moorum Road From Main Db Road to Rathu Maity at Diglar |
90000 |
Repair of Moorum Road From Main Db Road to Rathu Maity at Diglar1 |
Completion of work |
-
latitude : 22.10831511,22.10831632
Longitude : 87.39814546,87.39814593
file name : Image_24022023103118649.png
|
2023-02-24 10:31:18.738446 |
25 |
65491732 |
Repair of Moorum Road From Main Db Road to Rathu Maity at Diglar |
90000 |
Repair of Moorum Road From Main Db Road to Rathu Maity at Diglar1 |
Completion of work |
-
latitude : 22.10829173,22.10829252
Longitude : 87.39812504,87.39812452
file name : Image_24022023112444889.png
|
2023-02-24 11:24:45.014175 |
26 |
65491345 |
Repair of Moorum Road From Chowberia Sitala Mandir to Chowberia Das Para at Dakhin Korkora |
70000 |
Repair of Moorum Road From Chowberia Sitala Mandir to Chowberia Das Para at Dakhin Korkora1 |
Completion of work |
-
latitude : 22.10985205,22.10511952
Longitude : 87.38064437,87.38074708
file name : Image_24022023084859881.png
|
2023-02-24 08:48:59.970306 |
27 |
65491275 |
Repair of Moorum Road Akanda DB Road to Khudra Mahammadpur at Akanda Paschim |
70000 |
Repair of Moorum Road Akanda DB Road to Khudra Mahammadpur at Akanda Paschim1 |
Completion of work |
-
latitude : 22.08456059,22.08456055
Longitude : 87.36124914,87.36124901
file name : Image_24022023112451931.png
|
2023-02-24 11:24:52.036304 |
28 |
65491275 |
Repair of Moorum Road Akanda DB Road to Khudra Mahammadpur at Akanda Paschim |
70000 |
Repair of Moorum Road Akanda DB Road to Khudra Mahammadpur at Akanda Paschim1 |
Completion of work |
-
latitude : 22.08456059,22.08456055
Longitude : 87.36124914,87.36124901
file name : Image_24022023112457411.png
|
2023-02-24 11:24:57.512763 |
29 |
65491852 |
Repair of Moorum Road From Bardai Sing para to Basulitala Mandir at Bardai |
60221 |
Repair of Moorum Road From Bardai Sing para to Basulitala Mandir at Bardai1 |
Completion of work |
-
latitude : 22.09445134,22.09445133
Longitude : 87.38763065,87.38763063
file name : Image_22032023104502418.png
|
2023-03-22 10:45:02.529454 |
30 |
65491852 |
Repair of Moorum Road From Bardai Sing para to Basulitala Mandir at Bardai |
60221 |
Repair of Moorum Road From Bardai Sing para to Basulitala Mandir at Bardai1 |
Completion of work |
-
latitude : 22.09447036,22.09447298
Longitude : 87.38768959,87.38768848
file name : Image_03032023180434550.png
|
2023-03-03 18:04:34.655938 |
31 |
65490875 |
Repair of Moorum Road FROM Khulia More to Sundarpur at Khulia |
60221 |
Repair of Moorum Road FROM Khulia More to Sundarpur at Khulia1 |
Completion of work |
-
latitude : 22.1077511,22.10775106
Longitude : 87.41779633,87.4177962
file name : Image_03032023182221707.png
|
2023-03-03 18:22:21.957421 |
32 |
49251510 |
Construction of Submerssible With Walir Tank & Pipe Line at Bibhuti Bag to Brambhachari Khal at Takr |
290000 |
Construction of Submerssible With Walir Tank & Pipe Line at Bibhuti Bag to Brambhachari Khal at Takr1 |
Plinth level |
-
latitude : 22.1008668
Longitude : 87.40327842
file name : Image_22032023162655084.png
|
2023-03-22 16:26:55.177344 |
33 |
49251510 |
Construction of Submerssible With Walir Tank & Pipe Line at Bibhuti Bag to Brambhachari Khal at Takr |
290000 |
Construction of Submerssible With Walir Tank & Pipe Line at Bibhuti Bag to Brambhachari Khal at Takr1 |
Completion of work |
-
latitude : 22.10090228
Longitude : 87.40337019
file name : Image_10032023134303302.png
|
2023-03-10 13:43:03.412436 |
34 |
49246477 |
Construction of Submerssible With Walir Tank & Pipe Line at Hossenpur Desh Para at Hossenpur Sansad |
290000 |
Construction of Submerssible With Walir Tank & Pipe Line at Hossenpur Desh Para at Hossenpur Sansad1 |
Plinth level |
-
latitude : 22.10983399
Longitude : 87.36902178
file name : Image_26042023133034354.png
|
2023-04-26 13:30:34.487921 |
35 |
49246477 |
Construction of Submerssible With Walir Tank & Pipe Line at Hossenpur Desh Para at Hossenpur Sansad |
290000 |
Construction of Submerssible With Walir Tank & Pipe Line at Hossenpur Desh Para at Hossenpur Sansad1 |
Completion of work |
-
latitude : 22.10990063
Longitude : 87.36899232
file name : Image_09032023125303708.png
|
2023-03-09 12:53:03.800924 |
36 |
49246477 |
Construction of Submerssible With Walir Tank & Pipe Line at Hossenpur Desh Para at Hossenpur Sansad |
290000 |
Construction of Submerssible With Walir Tank & Pipe Line at Hossenpur Desh Para at Hossenpur Sansad1 |
Plinth level |
-
latitude : 22.10985755
Longitude : 87.36901223
file name : Image_09032023132623479.png
|
2023-03-09 13:26:23.578446 |
37 |
65491894 |
Construction of Concrete Road from Main Moorum Road to Mihir Maity at Hossenpur |
301818 |
Construction of Concrete Road from Main Moorum Road to Mihir Maity at Hossenpur1 |
Plinth level |
-
latitude : 22.10362944,22.10362573
Longitude : 87.36887608,87.3688777
file name : Image_09032023130227696.png
|
2023-03-09 13:02:27.782499 |
38 |
65491894 |
Construction of Concrete Road from Main Moorum Road to Mihir Maity at Hossenpur |
301818 |
Construction of Concrete Road from Main Moorum Road to Mihir Maity at Hossenpur1 |
Completion of work |
-
latitude : 22.10364785,22.10364787,22.103652
Longitude : 87.36888654,87.36888655,87.36889442
file name : Image_21022023162100514.png
|
2023-02-21 16:21:00.626561 |
39 |
49251609 |
Construction of Cement Concrete Drain from H/O Sk Rabiul to Jali Mahammad at Akanda Purba |
350000 |
Construction of Cement Concrete Drain from H/O Sk Rabiul to Jali Mahammad at Akanda Purba1 |
Plinth level |
-
latitude : 22.08320532
Longitude : 87.37931902
file name : Image_04032023114845011.png
|
2023-03-04 11:48:45.181889 |
40 |
49251609 |
Construction of Cement Concrete Drain from H/O Sk Rabiul to Jali Mahammad at Akanda Purba |
350000 |
Construction of Cement Concrete Drain from H/O Sk Rabiul to Jali Mahammad at Akanda Purba1 |
Completion of work |
-
latitude : 22.08312512
Longitude : 87.37931446
file name : Image_25022023094446150.png
|
2023-02-25 09:44:46.223145 |
41 |
65492694 |
Creation of a new source of drinking water |
333662 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.12086068
Longitude : 87.41216932
file name : Image_09032023162955539.png
|
2023-03-09 16:29:55.644009 |
42 |
65492694 |
Creation of a new source of drinking water |
333662 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.12089242
Longitude : 87.41222857
file name : Image_09032023163736535.png
|
2023-03-09 16:37:36.643312 |
43 |
65492694 |
Creation of a new source of drinking water |
333662 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.12092636
Longitude : 87.41215121
file name : Image_09032023165237655.png
|
2023-03-09 16:52:37.797813 |
44 |
65490841 |
Repair of Moorum Road from Khalina Pull to Mandar Khaya Ghat at Mandar |
97855 |
Repair of Moorum Road from Khalina Pull to Mandar Khaya Ghat at Mandar1 |
Completion of work |
-
latitude : 22.11770685,22.117703
Longitude : 87.41833006,87.41832152
file name : Image_09032023165803762.png
|
2023-03-09 16:58:03.858742 |
45 |
65490841 |
Repair of Moorum Road from Khalina Pull to Mandar Khaya Ghat at Mandar |
97855 |
Repair of Moorum Road from Khalina Pull to Mandar Khaya Ghat at Mandar1 |
Plinth level |
-
latitude : 22.11766125,22.11766115
Longitude : 87.4182505,87.41825032
file name : Image_09032023170013446.png
|
2023-03-09 17:00:13.541183 |
46 |
65490841 |
Repair of Moorum Road from Khalina Pull to Mandar Khaya Ghat at Mandar |
97855 |
Repair of Moorum Road from Khalina Pull to Mandar Khaya Ghat at Mandar1 |
Roof laid |
-
latitude : 22.11770398,22.11770505
Longitude : 87.41827145,87.41827034
file name : Image_09032023170226360.png
|
2023-03-09 17:02:26.457582 |
47 |
65506157 |
Repair of Moorum Road Swapan Das to Kanai Sing at Saljora |
74558 |
Repair of Moorum Road Swapan Das to Kanai Sing at Saljora1 |
Completion of work |
-
latitude : 22.08996255,22.08996203
Longitude : 87.39889752,87.39889843
file name : Image_10032023132134031.png
|
2023-03-10 13:21:34.128629 |
48 |
65506157 |
Repair of Moorum Road Swapan Das to Kanai Sing at Saljora |
74558 |
Repair of Moorum Road Swapan Das to Kanai Sing at Saljora1 |
Plinth level |
-
latitude : 22.08991252,22.08991407
Longitude : 87.398925,87.39891947
file name : Image_10032023132404140.png
|
2023-03-10 13:24:04.240694 |
49 |
65506157 |
Repair of Moorum Road Swapan Das to Kanai Sing at Saljora |
74558 |
Repair of Moorum Road Swapan Das to Kanai Sing at Saljora1 |
Roof laid |
-
latitude : 22.08990156,22.08990155
Longitude : 87.39891872,87.3989187
file name : Image_10032023132525588.png
|
2023-03-10 13:25:25.685776 |
50 |
65506122 |
Repair of Moorum Road Transformar to Binda Ban Jana at Saljora |
75000 |
Repair of Moorum Road Transformar to Binda Ban Jana at Saljora1 |
Completion of work |
-
latitude : 22.09114026,22.09114022
Longitude : 87.40057413,87.40057971
file name : Image_10032023132824742.png
|
2023-03-10 13:28:24.850527 |
51 |
65506122 |
Repair of Moorum Road Transformar to Binda Ban Jana at Saljora |
75000 |
Repair of Moorum Road Transformar to Binda Ban Jana at Saljora1 |
Plinth level |
-
latitude : 22.09114932,22.09114932
Longitude : 87.40056934,87.40056934
file name : Image_10032023133108484.png
|
2023-03-10 13:31:08.604038 |
52 |
65506122 |
Repair of Moorum Road Transformar to Binda Ban Jana at Saljora |
75000 |
Repair of Moorum Road Transformar to Binda Ban Jana at Saljora1 |
Roof laid |
-
latitude : 22.09123212,22.09123212
Longitude : 87.40050427,87.40050427
file name : Image_10032023133300406.png
|
2023-03-10 13:33:00.501746 |
53 |
65491766 |
Repair of Moorum Road From Tegeria to Maniraj at Tegeria |
97855 |
Repair of Moorum Road From Tegeria to Maniraj at Tegeria1 |
Completion of work |
-
latitude : 22.12333128,22.12333258
Longitude : 87.36139624,87.36139666
file name : Image_13032023140845441.png
|
2023-03-13 14:08:45.531967 |
54 |
65491766 |
Repair of Moorum Road From Tegeria to Maniraj at Tegeria |
97855 |
Repair of Moorum Road From Tegeria to Maniraj at Tegeria1 |
Plinth level |
-
latitude : 22.12342812,22.12342808
Longitude : 87.36142661,87.36142664
file name : Image_13032023141338435.png
|
2023-03-13 14:13:38.555985 |
55 |
65491766 |
Repair of Moorum Road From Tegeria to Maniraj at Tegeria |
97855 |
Repair of Moorum Road From Tegeria to Maniraj at Tegeria1 |
Roof laid |
-
latitude : 22.12344165,22.12344315
Longitude : 87.36143292,87.36143338
file name : Image_13032023141652084.png
|
2023-03-13 14:16:52.230914 |
56 |
39090801 |
ssp with Over Head tank and Pipe Line of Near House of Saktipada Bera at D korkora |
297809 |
ssp with Over Head tank and Pipe Line of Near House of Saktipada Bera at D korkora1 |
Roof laid |
-
latitude : 22.10178472
Longitude : 87.37503359
file name : Image_22032022175542228.png
|
2022-03-22 17:55:42.350231 |
57 |
39090801 |
ssp with Over Head tank and Pipe Line of Near House of Saktipada Bera at D korkora |
297809 |
ssp with Over Head tank and Pipe Line of Near House of Saktipada Bera at D korkora1 |
Plinth level |
-
latitude : 22.101786
Longitude : 87.37501781
file name : Image_22032022175408970.png
|
2022-03-22 17:54:09.093688 |
58 |
39090801 |
ssp with Over Head tank and Pipe Line of Near House of Saktipada Bera at D korkora |
297809 |
ssp with Over Head tank and Pipe Line of Near House of Saktipada Bera at D korkora1 |
Completion of work |
-
latitude : 22.10179585
Longitude : 87.37501626
file name : Image_22032022175037240.png
|
2022-03-22 17:50:37.365559 |
59 |
65506089 |
Construction of Concrete Road from Ramnath Dhal to Umesh Sing Via Haripada Dhal at Khalina |
151762 |
Construction of Concrete Road from Ramnath Dhal to Umesh Sing Via Haripada Dhal at Khalina1 |
Roof laid |
-
latitude : 22.10510119,22.10510324
Longitude : 87.41352176,87.41352114
file name : Image_25032023174248796.png
|
2023-03-25 17:42:48.881704 |
60 |
65506089 |
Construction of Concrete Road from Ramnath Dhal to Umesh Sing Via Haripada Dhal at Khalina |
151762 |
Construction of Concrete Road from Ramnath Dhal to Umesh Sing Via Haripada Dhal at Khalina1 |
Plinth level |
-
latitude : 22.10506132,22.10506015
Longitude : 87.41353248,87.41353226
file name : Image_21032023180641225.png
|
2023-03-21 18:06:41.324027 |
61 |
65506089 |
Construction of Concrete Road from Ramnath Dhal to Umesh Sing Via Haripada Dhal at Khalina |
151762 |
Construction of Concrete Road from Ramnath Dhal to Umesh Sing Via Haripada Dhal at Khalina1 |
Completion of work |
-
latitude : 22.10502358,22.10502348,22.10502348
Longitude : 87.41349635,87.41349623,87.41349623
file name : Image_21032023111633272.png
|
2023-03-21 11:16:33.368277 |
62 |
49246598 |
Construction of Submerssible With Walir Tank & Pipe Line at Tapas Das at Diglar |
295250 |
Construction of Submerssible With Walir Tank & Pipe Line at Tapas Das at Diglar1 |
Plinth level |
-
latitude : 22.11074291
Longitude : 87.3972857
file name : Image_17052022084755545.png
|
2022-05-17 08:47:55.65604 |
63 |
49246598 |
Construction of Submerssible With Walir Tank & Pipe Line at Tapas Das at Diglar |
295250 |
Construction of Submerssible With Walir Tank & Pipe Line at Tapas Das at Diglar1 |
Completion of work |
-
latitude : 22.1107926
Longitude : 87.39716726
file name : Image_03042022123115109.png
|
2022-04-03 12:31:15.248774 |
64 |
49246578 |
Construction of Cement Concrete Drain from Mir Nezamul Houque to Masjid at Akanda Paschim |
300000 |
Construction of Cement Concrete Drain from Mir Nezamul Houque to Masjid at Akanda Paschim1 |
Roof laid |
-
latitude : 22.08364606,22.08364606
Longitude : 87.37579869,87.37579869
file name : Image_15032023143432384.png
|
2023-03-15 14:34:32.477488 |
65 |
49246578 |
Construction of Cement Concrete Drain from Mir Nezamul Houque to Masjid at Akanda Paschim |
300000 |
Construction of Cement Concrete Drain from Mir Nezamul Houque to Masjid at Akanda Paschim1 |
Completion of work |
-
latitude : 22.08367563,22.0836756
Longitude : 87.37571219,87.37571229
file name : Image_15032023143002325.png
|
2023-03-15 14:30:02.527185 |
66 |
49246578 |
Construction of Cement Concrete Drain from Mir Nezamul Houque to Masjid at Akanda Paschim |
300000 |
Construction of Cement Concrete Drain from Mir Nezamul Houque to Masjid at Akanda Paschim1 |
Completion of work |
-
latitude : 22.08361913,22.08361603
Longitude : 87.37565189,87.37564499
file name : Image_14032023092653424.png
|
2023-03-14 09:26:53.495461 |
67 |
49246503 |
Construction of Submerssible With Walir Tank & Pipe Line at Bardai Primary School |
294984 |
Construction of Submerssible With Walir Tank & Pipe Line at Bardai Primary School1 |
Completion of work |
-
latitude : 22.09705114
Longitude : 87.39561806
file name : Image_04042022092806883.png
|
2022-04-04 09:28:06.987421 |
68 |
49245944 |
Construction of Concrete Road from H/O Dhiren Das to H/O saktipada Ghorai at Khalina |
297551 |
Construction of Concrete Road from H/O Dhiren Das to H/O saktipada Ghorai at Khalina1 |
Completion of work |
-
latitude : 22.10154008,22.10154081
Longitude : 87.42008992,87.42008795
file name : Image_06042022170708886.png
|
2022-04-06 17:07:09.012513 |
69 |
49245944 |
Construction of Concrete Road from H/O Dhiren Das to H/O saktipada Ghorai at Khalina |
297551 |
Construction of Concrete Road from H/O Dhiren Das to H/O saktipada Ghorai at Khalina1 |
Plinth level |
-
latitude : 22.10155027,22.10154766
Longitude : 87.42011218,87.42011378
file name : Image_08042022122346273.png
|
2022-04-08 12:23:46.423701 |
70 |
35200521 |
CC RD From Gharbank to House of Ananta Das at Khulia CFCG BG |
311971 |
CC RD From Gharbank to House of Ananta Das at Khulia CFCG BG1 |
Plinth level |
-
latitude : 22.10898046,22.10900552
Longitude : 87.40708419,87.40710668
file name : Image_31122021094111238.png
|
2021-12-31 09:41:11.352353 |
71 |
35200521 |
CC RD From Gharbank to House of Ananta Das at Khulia CFCG BG |
311971 |
CC RD From Gharbank to House of Ananta Das at Khulia CFCG BG1 |
Completion of work |
-
latitude : 22.10898739,22.10897475
Longitude : 87.4071334,87.40712343
file name : Image_26122021110135338.png
|
2021-12-26 11:01:35.426699 |
72 |
35173974 |
CC RD House of Laxmi Kanta Das to House of Rampada Murmu at Diglar CFCG BG |
314565 |
CC RD House of Laxmi Kanta Das to House of Rampada Murmu at Diglar CFCG BG1 |
Plinth level |
-
latitude : 22.11198662,22.11198662
Longitude : 87.3988424,87.3988424
file name : Image_12032022112835958.png
|
2022-03-12 11:28:36.08035 |
73 |
35173974 |
CC RD House of Laxmi Kanta Das to House of Rampada Murmu at Diglar CFCG BG |
314565 |
CC RD House of Laxmi Kanta Das to House of Rampada Murmu at Diglar CFCG BG1 |
Roof laid |
-
latitude : 22.11198354,22.11198354
Longitude : 87.39882905,87.39882905
file name : Image_12032022113036271.png
|
2022-03-12 11:30:36.374873 |
74 |
35173974 |
CC RD House of Laxmi Kanta Das to House of Rampada Murmu at Diglar CFCG BG |
314565 |
CC RD House of Laxmi Kanta Das to House of Rampada Murmu at Diglar CFCG BG1 |
Completion of work |
-
latitude : 22.11189515,22.11189326
Longitude : 87.39879639,87.39879515
file name : Image_12032022104657004.png
|
2022-03-12 10:46:57.133052 |
75 |
35093071 |
CC RD From Main Moorum Road to Brambhachari Khal at Deula CFCG BG |
311971 |
CC RD From Main Moorum Road to Brambhachari Khal at Deula CFCG BG1 |
Completion of work |
-
latitude : 22.10970147,22.10970147
Longitude : 87.39299307,87.39299307
file name : Image_23032022084649267.png
|
2022-03-23 08:46:49.388469 |
76 |
39095475 |
Ssp with over tank and pipe line nea bakhrabad 3 sansad |
297433 |
Ssp with over tank and pipe line nea bakhrabad 3 sansad1 |
Plinth level |
-
latitude : 22.12036915,22.12036915
Longitude : 87.37855822,87.37855822
file name : Image_01102021112526818.png
|
2021-10-01 11:25:26.920716 |
77 |
39095475 |
Ssp with over tank and pipe line nea bakhrabad 3 sansad |
297433 |
Ssp with over tank and pipe line nea bakhrabad 3 sansad1 |
Completion of work |
-
latitude : 22.12027906,22.12028394
Longitude : 87.37858538,87.37857634
file name : Image_21062021160726430.png
|
2021-06-21 16:07:26.535353 |
78 |
39094819 |
Ssp with over tank and pipe line near Birbarpur harijan |
297433 |
Ssp with over tank and pipe line near Birbarpur harijan1 |
Plinth level |
-
latitude : 22.08347224,22.08346916
Longitude : 87.4117931,87.41178517
file name : Image_03072021121928389.png
|
2021-07-03 12:19:28.516664 |
79 |
39094819 |
Ssp with over tank and pipe line near Birbarpur harijan |
297433 |
Ssp with over tank and pipe line near Birbarpur harijan1 |
Roof laid |
-
latitude : 22.08355046,22.08356473
Longitude : 87.41176068,87.41177308
file name : Image_01082021123004731.png
|
2021-08-01 12:30:04.834462 |
80 |
39094819 |
Ssp with over tank and pipe line near Birbarpur harijan |
297433 |
Ssp with over tank and pipe line near Birbarpur harijan1 |
Completion of work |
-
latitude : 22.08357545,22.08357563
Longitude : 87.41178033,87.41177977
file name : Image_12042021123303160.png
|
2021-04-12 12:33:03.26092 |
81 |
35216983 |
CC RD From Milan Sanga Club to House of Srikanta Senapati at Saljora CFCG BG |
311971 |
CC RD From Milan Sanga Club to House of Srikanta Senapati at Saljora CFCG BG1 |
Roof laid |
-
latitude : 22.08789666,22.08789468
Longitude : 87.40215203,87.40215152
file name : Image_12032022111626904.png
|
2022-03-12 11:16:26.998575 |
82 |
35216983 |
CC RD From Milan Sanga Club to House of Srikanta Senapati at Saljora CFCG BG |
311971 |
CC RD From Milan Sanga Club to House of Srikanta Senapati at Saljora CFCG BG1 |
Plinth level |
-
latitude : 22.0878879,22.08788713
Longitude : 87.40213544,87.40213424
file name : Image_12032022111341718.png
|
2022-03-12 11:13:41.808952 |
83 |
35216983 |
CC RD From Milan Sanga Club to House of Srikanta Senapati at Saljora CFCG BG |
311971 |
CC RD From Milan Sanga Club to House of Srikanta Senapati at Saljora CFCG BG1 |
Completion of work |
-
latitude : 22.08792241,22.08792239
Longitude : 87.4021429,87.40214285
file name : Image_12032022103204627.png
|
2022-03-12 10:32:04.730165 |
84 |
39094774 |
Ssp with over tank and pipe line near Haripur primary school |
297433 |
Ssp with over tank and pipe line near Haripur primary school1 |
Roof laid |
-
latitude : 22.11857872,22.11857873
Longitude : 87.41204324,87.41204326
file name : Image_13112021100220737.png
|
2021-11-13 10:02:20.831211 |
85 |
39094774 |
Ssp with over tank and pipe line near Haripur primary school |
297433 |
Ssp with over tank and pipe line near Haripur primary school1 |
Plinth level |
-
latitude : 22.11845578,22.11845577
Longitude : 87.41205923,87.41205923
file name : Image_13082021134535874.png
|
2021-08-13 13:45:35.980164 |
86 |
39094774 |
Ssp with over tank and pipe line near Haripur primary school |
297433 |
Ssp with over tank and pipe line near Haripur primary school1 |
Completion of work |
-
latitude : 22.11848471,22.11848042
Longitude : 87.41207859,87.41206885
file name : Image_13082021134017901.png
|
2021-08-13 13:40:18.022601 |
87 |
39094774 |
Ssp with over tank and pipe line near Haripur primary school |
297433 |
Ssp with over tank and pipe line near Haripur primary school1 |
Completion of work |
-
latitude : 22.11860836,22.11860836
Longitude : 87.41209813,87.41209813
file name : Image_23042021153311823.png
|
2021-04-23 15:33:11.941026 |
88 |
39094849 |
Ssp with over tank and pipe line near Badal Ghorai at deula |
297433 |
Ssp with over tank and pipe line near Badal Ghorai at deula1 |
Completion of work |
-
latitude : 22.07793666,22.07793717
Longitude : 87.38409264,87.38409242
file name : Image_01062021122205816.png
|
2021-06-01 12:22:05.935139 |
89 |
39094849 |
Ssp with over tank and pipe line near Badal Ghorai at deula |
297433 |
Ssp with over tank and pipe line near Badal Ghorai at deula1 |
Completion of work |
-
latitude : 22.07791873,22.07791814
Longitude : 87.38412221,87.38412103
file name : Image_20072021130257511.png
|
2021-07-20 13:02:57.607336 |
90 |
39090760 |
ssp with Over Head tank and Pipe Line of Near house of Dhiren Kar at Akanda Purbo |
297809 |
ssp with Over Head tank and Pipe Line of Near house of Dhiren Kar at Akanda Purbo1 |
Completion of work |
-
latitude : 22.08750572
Longitude : 87.38113801
file name : Image_03012022142313734.png
|
2022-01-03 14:23:13.847289 |
91 |
35175518 |
CC RD road From House of Sasanka Nayek to House of Dipankar Pandit at Kamargeria CFCG BG |
310556 |
CC RD road From House of Sasanka Nayek to House of Dipankar Pandit at Kamargeria CFCG BG1 |
Plinth level |
-
latitude : 22.11261623,22.11261535
Longitude : 87.38993429,87.38993451
file name : Image_31032021094303843.png
|
2021-03-31 09:43:03.954504 |
92 |
35175518 |
CC RD road From House of Sasanka Nayek to House of Dipankar Pandit at Kamargeria CFCG BG |
310556 |
CC RD road From House of Sasanka Nayek to House of Dipankar Pandit at Kamargeria CFCG BG1 |
Roof laid |
-
latitude : 22.11259712,22.11259556
Longitude : 87.38995832,87.38995663
file name : Image_31032021095015287.png
|
2021-03-31 09:50:15.401648 |
93 |
35175518 |
CC RD road From House of Sasanka Nayek to House of Dipankar Pandit at Kamargeria CFCG BG |
310556 |
CC RD road From House of Sasanka Nayek to House of Dipankar Pandit at Kamargeria CFCG BG1 |
Completion of work |
-
latitude : 22.11260686,22.1126018
Longitude : 87.38995911,87.38994934
file name : Image_11032021111605636.png
|
2021-03-11 11:16:05.736747 |
94 |
39095523 |
Ssp with over tank and pipe line near Purba akanda sansad |
297433 |
Ssp with over tank and pipe line near Purba akanda sansad1 |
Roof laid |
-
latitude : 22.08743528,22.08743529
Longitude : 87.38112583,87.38112585
file name : Image_02032022114943846.png
|
2022-03-02 11:49:43.964485 |
95 |
39095523 |
Ssp with over tank and pipe line near Purba akanda sansad |
297433 |
Ssp with over tank and pipe line near Purba akanda sansad1 |
Completion of work |
-
latitude : 22.08904075,22.0890411
Longitude : 87.37487853,87.3748779
file name : Image_20072021121003795.png
|
2021-07-20 12:10:03.889514 |
96 |
39095523 |
Ssp with over tank and pipe line near Purba akanda sansad |
297433 |
Ssp with over tank and pipe line near Purba akanda sansad1 |
Completion of work |
-
latitude : 22.08904699,22.08904697
Longitude : 87.37485287,87.37485288
file name : Image_20072021122952737.png
|
2021-07-20 12:29:52.836804 |
97 |
39094731 |
Ssp with over tank and pipe line near purba jagatpur icds |
309616 |
Ssp with over tank and pipe line near purba jagatpur icds1 |
Plinth level |
-
latitude : 22.11636431,22.11636431
Longitude : 87.37074815,87.37074815
file name : Image_29032022170347920.png
|
2022-03-29 17:03:48.105715 |
98 |
39094731 |
Ssp with over tank and pipe line near purba jagatpur icds |
309616 |
Ssp with over tank and pipe line near purba jagatpur icds1 |
Completion of work |
-
latitude : 22.10246582,22.10248344
Longitude : 87.39714315,87.39714237
file name : Image_28012022164902880.png
|
2022-01-28 16:49:03.105182 |
99 |
39094731 |
Ssp with over tank and pipe line near purba jagatpur icds |
309616 |
Ssp with over tank and pipe line near purba jagatpur icds1 |
Completion of work |
-
latitude : 22.10246582,22.10248344
Longitude : 87.39714315,87.39714237
file name : Image_28012022164914314.png
|
2022-01-28 16:49:14.548755 |
100 |
39100762 |
C pond protection wall near Rana para road at Jagagatpur |
163708 |
C pond protection wall near Rana para road at Jagagatpur 1 |
Completion of work |
-
latitude : 22.10830293
Longitude : 87.39240613
file name : Image_07052022111124183.png
|
2022-05-07 11:11:24.299166 |
101 |
39100762 |
C pond protection wall near Rana para road at Jagagatpur |
163708 |
C pond protection wall near Rana para road at Jagagatpur 1 |
Plinth level |
-
latitude : 22.10830322
Longitude : 87.39244747
file name : Image_07052022111517308.png
|
2022-05-07 11:15:17.398427 |
102 |
39100762 |
C pond protection wall near Rana para road at Jagagatpur |
163708 |
C pond protection wall near Rana para road at Jagagatpur 1 |
Roof laid |
-
latitude : 22.10832211
Longitude : 87.39248991
file name : Image_07052022111748976.png
|
2022-05-07 11:17:49.073575 |
103 |
39095558 |
Ssp with over tank and pipe line Sarsa sansad |
303278 |
Ssp with over tank and pipe line Sarsa sansad1 |
Plinth level |
-
latitude : 22.08832064,22.08604869
Longitude : 87.39421219,87.3980858
file name : Image_23032022085714976.png
|
2022-03-23 08:57:15.10661 |
104 |
39095558 |
Ssp with over tank and pipe line Sarsa sansad |
303278 |
Ssp with over tank and pipe line Sarsa sansad1 |
Completion of work |
-
latitude : 22.08616384,22.08616392
Longitude : 87.39820037,87.39820035
file name : Image_07012022142955534.png
|
2022-01-07 14:29:55.650988 |
105 |
39094618 |
Ssp with over tank and pipe line near kamal patra at tegeria |
297433 |
Ssp with over tank and pipe line near kamal patra at tegeria1 |
Completion of work |
-
latitude : 22.12328472,22.12328565
Longitude : 87.36200852,87.36200798
file name : Image_04072022122358024.png
|
2022-07-04 12:23:58.126603 |
106 |
39094618 |
Ssp with over tank and pipe line near kamal patra at tegeria |
297433 |
Ssp with over tank and pipe line near kamal patra at tegeria1 |
Completion of work |
-
latitude : 22.1221926,22.12219234
Longitude : 87.36631853,87.3663189
file name : Image_27042021133553723.png
|
2021-04-27 13:35:53.86024 |
107 |
35390472 |
Sinking of Submersible Pump with Overhead tank and Pipeline at Colony Kali Mandir at Bkd |
297433 |
Sinking of Submersible Pump with Overhead tank and Pipeline at Colony Kali Mandir at Bkd 1 |
Roof laid |
-
latitude : 22.12397846
Longitude : 87.37508088
file name : Image_27082021142914401.png
|
2021-08-27 14:29:14.514725 |
108 |
35390472 |
Sinking of Submersible Pump with Overhead tank and Pipeline at Colony Kali Mandir at Bkd |
297433 |
Sinking of Submersible Pump with Overhead tank and Pipeline at Colony Kali Mandir at Bkd 1 |
Plinth level |
-
latitude : 22.12398899
Longitude : 87.37511575
file name : Image_27082021142320700.png
|
2021-08-27 14:23:20.822268 |
109 |
35390472 |
Sinking of Submersible Pump with Overhead tank and Pipeline at Colony Kali Mandir at Bkd |
297433 |
Sinking of Submersible Pump with Overhead tank and Pipeline at Colony Kali Mandir at Bkd 1 |
Completion of work |
-
latitude : 22.12392268
Longitude : 87.37506453
file name : Image_01062021122202425.png
|
2021-06-01 12:22:02.548444 |
110 |
39094694 |
Ssp with over tank and pipe line near khalina bazar |
297809 |
Ssp with over tank and pipe line near khalina bazar1 |
Roof laid |
-
latitude : 22.10005546,22.10005546
Longitude : 87.41691009,87.41691009
file name : Image_01032022163658735.png
|
2022-03-01 16:36:58.852805 |
111 |
39094694 |
Ssp with over tank and pipe line near khalina bazar |
297809 |
Ssp with over tank and pipe line near khalina bazar1 |
Plinth level |
-
latitude : 22.09999929,22.09999931
Longitude : 87.41689535,87.41689534
file name : Image_23012022101425667.png
|
2022-01-23 10:14:25.797889 |
112 |
39094694 |
Ssp with over tank and pipe line near khalina bazar |
297809 |
Ssp with over tank and pipe line near khalina bazar1 |
Completion of work |
-
latitude : 22.10007294,22.10007294
Longitude : 87.41684358,87.41684359
file name : Image_03012022142317366.png
|
2022-01-03 14:23:17.531086 |
113 |
39090840 |
ssp with Over Head tank and Pipe Line of Near Akanda Bagan ST Para at Akanda Paschim |
303800 |
ssp with Over Head tank and Pipe Line of Near Akanda Bagan ST Para at Akanda Paschim1 |
Completion of work |
-
latitude : 22.08414736
Longitude : 87.36232841
file name : Image_01102021112532620.png
|
2021-10-01 11:25:32.731032 |
114 |
39090840 |
ssp with Over Head tank and Pipe Line of Near Akanda Bagan ST Para at Akanda Paschim |
303800 |
ssp with Over Head tank and Pipe Line of Near Akanda Bagan ST Para at Akanda Paschim1 |
Completion of work |
-
latitude : 22.08410829
Longitude : 87.36224992
file name : Image_27042021133601810.png
|
2021-04-27 13:36:01.907961 |
115 |
35172093 |
CC RD From PMGSY Road at House of Gorachand Barik to House of Dhananjoy Barik at Bardai CFCG BG |
301713 |
CC RD From PMGSY Road at House of Gorachand Barik to House of Dhananjoy Barik at Bardai CFCG BG1 |
Roof laid |
-
latitude : 22.09716222,22.09715648
Longitude : 87.3970462,87.39703626
file name : Image_16032021121027691.png
|
2021-03-16 12:10:27.780037 |
116 |
35172093 |
CC RD From PMGSY Road at House of Gorachand Barik to House of Dhananjoy Barik at Bardai CFCG BG |
301713 |
CC RD From PMGSY Road at House of Gorachand Barik to House of Dhananjoy Barik at Bardai CFCG BG1 |
Plinth level |
-
latitude : 22.10241151,22.09709152
Longitude : 87.39698893,87.39694872
file name : Image_16032021120623004.png
|
2021-03-16 12:06:23.092692 |
117 |
35172093 |
CC RD From PMGSY Road at House of Gorachand Barik to House of Dhananjoy Barik at Bardai CFCG BG |
301713 |
CC RD From PMGSY Road at House of Gorachand Barik to House of Dhananjoy Barik at Bardai CFCG BG1 |
Completion of work |
-
latitude : 22.09707029,22.09707808
Longitude : 87.39704031,87.39702761
file name : Image_22012021103925998.png
|
2021-01-22 10:39:26.090911 |
118 |
49246561 |
Construction of Pucca Drain at H/O Rajen Ghorai to Gopal Murmu at Deula |
311056 |
Construction of Pucca Drain at H/O Rajen Ghorai to Gopal Murmu at Deula1 |
Completion of work |
-
latitude : 22.07803605,22.07803484
Longitude : 87.38415145,87.38415248
file name : Image_05072022131415204.png
|
2022-07-05 13:14:15.299975 |
119 |
49246561 |
Construction of Pucca Drain at H/O Rajen Ghorai to Gopal Murmu at Deula |
311056 |
Construction of Pucca Drain at H/O Rajen Ghorai to Gopal Murmu at Deula1 |
Plinth level |
-
latitude : 22.07876043,22.07875794
Longitude : 87.38386221,87.38386152
file name : Image_05072022132012906.png
|
2022-07-05 13:20:12.995001 |
120 |
49246561 |
Construction of Pucca Drain at H/O Rajen Ghorai to Gopal Murmu at Deula |
311056 |
Construction of Pucca Drain at H/O Rajen Ghorai to Gopal Murmu at Deula1 |
Roof laid |
-
latitude : 22.07876224,22.07876225
Longitude : 87.38384423,87.38384421
file name : Image_05072022132310048.png
|
2022-07-05 13:23:10.145479 |
121 |
35215801 |
CC RD From D B Road to Jana Para at Khalina CFCG BG |
143835 |
CC RD From D B Road to Jana Para at Khalina CFCG BG1 |
Roof laid |
-
latitude : 22.10183913,22.10183912
Longitude : 87.41751507,87.41751508
file name : Image_16032021123201117.png
|
2021-03-16 12:32:01.220711 |
122 |
35215801 |
CC RD From D B Road to Jana Para at Khalina CFCG BG |
143835 |
CC RD From D B Road to Jana Para at Khalina CFCG BG1 |
Plinth level |
-
latitude : 22.10182879,22.10182927
Longitude : 87.41752014,87.41752206
file name : Image_16032021122820672.png
|
2021-03-16 12:28:20.771536 |
123 |
35215801 |
CC RD From D B Road to Jana Para at Khalina CFCG BG |
143835 |
CC RD From D B Road to Jana Para at Khalina CFCG BG1 |
Completion of work |
-
latitude : 22.10178271,22.10178738
Longitude : 87.41755475,87.4175558
file name : Image_27012021121546353.png
|
2021-01-27 12:15:46.448355 |
124 |
35176260 |
CC RD From House of Srimanta Ghorai to House Of Kalipada Pandit at Dhobonia CFCG BG |
313139 |
CC RD From House of Srimanta Ghorai to House Of Kalipada Pandit at Dhobonia CFCG BG1 |
Roof laid |
-
latitude : 22.1101136,22.1101156
Longitude : 87.39055304,87.39055141
file name : Image_17032021115532409.png
|
2021-03-17 11:55:32.501966 |
125 |
35176260 |
CC RD From House of Srimanta Ghorai to House Of Kalipada Pandit at Dhobonia CFCG BG |
313139 |
CC RD From House of Srimanta Ghorai to House Of Kalipada Pandit at Dhobonia CFCG BG1 |
Plinth level |
-
latitude : 22.11014798,22.11015769
Longitude : 87.39057909,87.3905629
file name : Image_16032021115423091.png
|
2021-03-16 11:54:23.217724 |
126 |
35176260 |
CC RD From House of Srimanta Ghorai to House Of Kalipada Pandit at Dhobonia CFCG BG |
313139 |
CC RD From House of Srimanta Ghorai to House Of Kalipada Pandit at Dhobonia CFCG BG1 |
Completion of work |
-
latitude : 22.11014162,22.1101277
Longitude : 87.39055303,87.3905322
file name : Image_15012021093650450.png
|
2021-01-15 09:36:50.579087 |
127 |
39100897 |
Ccrd tapan bera to pakur tala at hossenpur |
306391 |
Ccrd tapan bera to pakur tala at hossenpur 1 |
Plinth level |
-
latitude : 22.10287517,22.10288049
Longitude : 87.37004151,87.36999318
file name : Image_31032021101100038.png
|
2021-03-31 10:11:00.128958 |
128 |
39100897 |
Ccrd tapan bera to pakur tala at hossenpur |
306391 |
Ccrd tapan bera to pakur tala at hossenpur 1 |
Roof laid |
-
latitude : 22.10287244,22.10287219
Longitude : 87.36999623,87.3699964
file name : Image_31032021102257149.png
|
2021-03-31 10:22:57.248005 |
129 |
39100897 |
Ccrd tapan bera to pakur tala at hossenpur |
306391 |
Ccrd tapan bera to pakur tala at hossenpur 1 |
Completion of work |
-
latitude : 22.10292704,22.10290418
Longitude : 87.3700308,87.37003361
file name : Image_12022021123420252.png
|
2021-02-12 12:34:20.374584 |
130 |
49251573 |
Construction of Submerssible With Walir Tank & Pipe Line at Tegeria Bartala Sibalay Mandit at Bakhra |
295235 |
Construction of Submerssible With Walir Tank & Pipe Line at Tegeria Bartala Sibalay Mandit at Bakhra1 |
Plinth level |
-
latitude : 22.12331945
Longitude : 87.36210426
file name : Image_18072022154500979.png
|
2022-07-18 15:45:01.083953 |
131 |
49251573 |
Construction of Submerssible With Walir Tank & Pipe Line at Tegeria Bartala Sibalay Mandit at Bakhra |
295235 |
Construction of Submerssible With Walir Tank & Pipe Line at Tegeria Bartala Sibalay Mandit at Bakhra1 |
Completion of work |
-
latitude : 22.12319575
Longitude : 87.36205115
file name : Image_31032022125629266.png
|
2022-03-31 12:56:29.396473 |
132 |
35086093 |
CC RD From House of Khagendra Nath Shit to House of Dhirendra Nath Shit at Chowgeria CFCG BG |
307255 |
CC RD From House of Khagendra Nath Shit to House of Dhirendra Nath Shit at Chowgeria CFCG BG1 |
Plinth level |
-
latitude : 22.1035892,22.10360363
Longitude : 87.37977544,87.37976036
file name : Image_20032021105449203.png
|
2021-03-20 10:54:49.317722 |
133 |
35086093 |
CC RD From House of Khagendra Nath Shit to House of Dhirendra Nath Shit at Chowgeria CFCG BG |
307255 |
CC RD From House of Khagendra Nath Shit to House of Dhirendra Nath Shit at Chowgeria CFCG BG1 |
Roof laid |
-
latitude : 22.10356137,22.10356013
Longitude : 87.37976128,87.37976115
file name : Image_20032021111511602.png
|
2021-03-20 11:15:11.558593 |
134 |
35086093 |
CC RD From House of Khagendra Nath Shit to House of Dhirendra Nath Shit at Chowgeria CFCG BG |
307255 |
CC RD From House of Khagendra Nath Shit to House of Dhirendra Nath Shit at Chowgeria CFCG BG1 |
Completion of work |
-
latitude : 22.1035754,22.10357943
Longitude : 87.37978599,87.3797847
file name : Image_27022021103755639.png
|
2021-02-27 10:37:55.743318 |
135 |
49245862 |
Construction of Concrete Road from main Moorum Road to H/O Pulin Das at Akanda East |
305473 |
Construction of Concrete Road from main Moorum Road to H/O Pulin Das at Akanda East1 |
Completion of work |
-
latitude : 22.08918715,22.08918561
Longitude : 87.37486873,87.37487026
file name : Image_05072022134230306.png
|
2022-07-05 13:42:30.419634 |
136 |
49245862 |
Construction of Concrete Road from main Moorum Road to H/O Pulin Das at Akanda East |
305473 |
Construction of Concrete Road from main Moorum Road to H/O Pulin Das at Akanda East1 |
Plinth level |
-
latitude : 22.08916427,22.08916411
Longitude : 87.37485308,87.37485657
file name : Image_05072022134857128.png
|
2022-07-05 13:48:57.287095 |
137 |
49245862 |
Construction of Concrete Road from main Moorum Road to H/O Pulin Das at Akanda East |
305473 |
Construction of Concrete Road from main Moorum Road to H/O Pulin Das at Akanda East1 |
Roof laid |
-
latitude : 22.08912118,22.08912101
Longitude : 87.37483879,87.37483902
file name : Image_05072022135031099.png
|
2022-07-05 13:50:31.212156 |
138 |
35201357 |
CC RD From House of Ganeshayam Das to House of Subhas Samanta at Takrar CFCG BG |
310664 |
CC RD From House of Ganeshayam Das to House of Subhas Samanta at Takrar CFCG BG1 |
Roof laid |
-
latitude : 22.10049107,22.10049978
Longitude : 87.40226382,87.40226265
file name : Image_16032021122134443.png
|
2021-03-16 12:21:34.533595 |
139 |
35201357 |
CC RD From House of Ganeshayam Das to House of Subhas Samanta at Takrar CFCG BG |
310664 |
CC RD From House of Ganeshayam Das to House of Subhas Samanta at Takrar CFCG BG1 |
Plinth level |
-
latitude : 22.10536825,22.10053821
Longitude : 87.40451203,87.40234667
file name : Image_16032021121909739.png
|
2021-03-16 12:19:09.826384 |
140 |
49245917 |
Construction of Concrete Road from H/O Goutam Bar Land to H/O Prasanna Mandal at Sarsa |
302378 |
Construction of Concrete Road from H/O Goutam Bar Land to H/O Prasanna Mandal at Sarsa1 |
Completion of work |
-
latitude : 22.08289918,22.0828995
Longitude : 87.39400164,87.39400195
file name : Image_05072022124924157.png
|
2022-07-05 12:49:24.262412 |
141 |
49245917 |
Construction of Concrete Road from H/O Goutam Bar Land to H/O Prasanna Mandal at Sarsa |
302378 |
Construction of Concrete Road from H/O Goutam Bar Land to H/O Prasanna Mandal at Sarsa1 |
Plinth level |
-
latitude : 22.08285334,22.08285338
Longitude : 87.39399362,87.39399365
file name : Image_05072022125313282.png
|
2022-07-05 12:53:13.390189 |
142 |
49245917 |
Construction of Concrete Road from H/O Goutam Bar Land to H/O Prasanna Mandal at Sarsa |
302378 |
Construction of Concrete Road from H/O Goutam Bar Land to H/O Prasanna Mandal at Sarsa1 |
Roof laid |
-
latitude : 22.08286829,22.08286829
Longitude : 87.39398225,87.39398226
file name : Image_05072022125440772.png
|
2022-07-05 12:54:40.877202 |
143 |
49259219 |
Construction of Submerssible With Walir Tank & Pipe Line at Saljora Milan Sanga at Saljora |
295072 |
Construction of Submerssible With Walir Tank & Pipe Line at Saljora Milan Sanga at Saljora1 |
Completion of work |
-
latitude : 22.08787543
Longitude : 87.40192585
file name : Image_30032022122648956.png
|
2022-03-30 12:26:49.059875 |
144 |
49251814 |
Construction of Submerssible With Walir Tank & Pipe Line at Khulia Sansad at Khulia |
295294 |
Construction of Submerssible With Walir Tank & Pipe Line at Khulia Sansad at Khulia1 |
Completion of work |
-
latitude : 22.10773486
Longitude : 87.40915244
file name : Image_28032022204514209.png
|
2022-03-28 20:45:14.391375 |
145 |
49245585 |
Construction of Concrete Road from H/O Dhiren Shit to Chowberia Primary School at Chowgeria |
305473 |
Construction of Concrete Road from H/O Dhiren Shit to Chowberia Primary School at Chowgeria1 |
Roof laid |
-
latitude : 22.10432164,22.10432182
Longitude : 87.37924938,87.37925144
file name : Image_11042022135943900.png
|
2022-04-11 13:59:44.04637 |
146 |
49245585 |
Construction of Concrete Road from H/O Dhiren Shit to Chowberia Primary School at Chowgeria |
305473 |
Construction of Concrete Road from H/O Dhiren Shit to Chowberia Primary School at Chowgeria1 |
Completion of work |
-
latitude : 22.10437629,22.10437617
Longitude : 87.37923735,87.37923694
file name : Image_06042022171622142.png
|
2022-04-06 17:16:22.247693 |
147 |
49245585 |
Construction of Concrete Road from H/O Dhiren Shit to Chowberia Primary School at Chowgeria |
305473 |
Construction of Concrete Road from H/O Dhiren Shit to Chowberia Primary School at Chowgeria1 |
Plinth level |
-
latitude : 22.10439838,22.10439838
Longitude : 87.3792589,87.3792589
file name : Image_07042022100726069.png
|
2022-04-07 10:07:26.153546 |
148 |
49245480 |
Construction of Concrete Road from Kagli DB Road to Dukhiram Mandi at Kagli |
298125 |
Construction of Concrete Road from Kagli DB Road to Dukhiram Mandi at Kagli1 |
Plinth level |
-
latitude : 22.11513628,22.11513603
Longitude : 87.38421484,87.38421548
file name : Image_11042022134527931.png
|
2022-04-11 13:45:28.049188 |
149 |
49245480 |
Construction of Concrete Road from Kagli DB Road to Dukhiram Mandi at Kagli |
298125 |
Construction of Concrete Road from Kagli DB Road to Dukhiram Mandi at Kagli1 |
Completion of work |
-
latitude : 22.11517247,22.11517457
Longitude : 87.38423768,87.38424343
file name : Image_07042022130653909.png
|
2022-04-07 13:06:54.002303 |
150 |
49245480 |
Construction of Concrete Road from Kagli DB Road to Dukhiram Mandi at Kagli |
298125 |
Construction of Concrete Road from Kagli DB Road to Dukhiram Mandi at Kagli1 |
Completion of work |
-
latitude : 22.11532724,22.11530857
Longitude : 87.38418053,87.3841812
file name : Image_08042022121103787.png
|
2022-04-08 12:11:03.897388 |
151 |
49245745 |
Construction of Concrete Road from H/O Kashinath Das to Thakur Bari at Akanda Paschim |
305473 |
Construction of Concrete Road from H/O Kashinath Das to Thakur Bari at Akanda Paschim1 |
Plinth level |
-
latitude : 22.0853882,22.0853882
Longitude : 87.3548453,87.3548453
file name : Image_28032022143018829.png
|
2022-03-28 14:30:18.97562 |
152 |
49245745 |
Construction of Concrete Road from H/O Kashinath Das to Thakur Bari at Akanda Paschim |
305473 |
Construction of Concrete Road from H/O Kashinath Das to Thakur Bari at Akanda Paschim1 |
Completion of work |
-
latitude : 22.0853885,22.0853885
Longitude : 87.3548454,87.3548454
file name : Image_28032022142246802.png
|
2022-03-28 14:22:46.942154 |
153 |
65491803 |
Repair of Moorum Road From Db Road to Dakhin Chak at Takrar |
69181 |
Repair of Moorum Road From Db Road to Dakhin Chak at Takrar1 |
Completion of work |
-
latitude : 22.10087864,22.10087966
Longitude : 87.40351954,87.40351977
file name : Image_22032023140827438.png
|
2023-03-22 14:08:27.531091 |
154 |
65491803 |
Repair of Moorum Road From Db Road to Dakhin Chak at Takrar |
69181 |
Repair of Moorum Road From Db Road to Dakhin Chak at Takrar1 |
Plinth level |
-
latitude : 22.10082184,22.10082215
Longitude : 87.40354434,87.4035469
file name : Image_22032023141513011.png
|
2023-03-22 14:15:13.110328 |
155 |
59320608 |
Construction of Concrete Road from Sub Santer to House of Firoj Mahammad at Akanda Purba |
307692 |
Construction of Concrete Road from Sub Santer to House of Firoj Mahammad at Akanda Purba1 |
Completion of work |
-
latitude : 22.08412454,22.08412444
Longitude : 87.38214099,87.38214127
file name : Image_23032023123133525.png
|
2023-03-23 12:31:33.621021 |
156 |
59320608 |
Construction of Concrete Road from Sub Santer to House of Firoj Mahammad at Akanda Purba |
307692 |
Construction of Concrete Road from Sub Santer to House of Firoj Mahammad at Akanda Purba1 |
Plinth level |
-
latitude : 22.08419168,22.08419143
Longitude : 87.3822948,87.38229563
file name : Image_27032023163022517.png
|
2023-03-27 16:30:22.835823 |
157 |
59320608 |
Construction of Concrete Road from Sub Santer to House of Firoj Mahammad at Akanda Purba |
307692 |
Construction of Concrete Road from Sub Santer to House of Firoj Mahammad at Akanda Purba1 |
Roof laid |
-
latitude : 22.08421495,22.08421495
Longitude : 87.38228391,87.38228391
file name : Image_27032023163309039.png
|
2023-03-27 16:33:09.190043 |
158 |
65491316 |
Repair of Moorum Road From Ukrasanda to Maniraj via Mill Para to Bakhrabad Bharati Vidyapith at Ukra |
128320 |
Repair of Moorum Road From Ukrasanda to Maniraj via Mill Para to Bakhrabad Bharati Vidyapith at Ukra1 |
Completion of work |
-
latitude : 22.11647517,22.11647512
Longitude : 87.36355025,87.36355025
file name : Image_22032023134113668.png
|
2023-03-22 13:41:13.760398 |
159 |
65491316 |
Repair of Moorum Road From Ukrasanda to Maniraj via Mill Para to Bakhrabad Bharati Vidyapith at Ukra |
128320 |
Repair of Moorum Road From Ukrasanda to Maniraj via Mill Para to Bakhrabad Bharati Vidyapith at Ukra1 |
Plinth level |
-
latitude : 22.11646389,22.11646389
Longitude : 87.36353212,87.36353214
file name : Image_22032023134530213.png
|
2023-03-22 13:45:30.302952 |
160 |
65491316 |
Repair of Moorum Road From Ukrasanda to Maniraj via Mill Para to Bakhrabad Bharati Vidyapith at Ukra |
128320 |
Repair of Moorum Road From Ukrasanda to Maniraj via Mill Para to Bakhrabad Bharati Vidyapith at Ukra1 |
Roof laid |
-
latitude : 22.11648723,22.11648657
Longitude : 87.36353576,87.36353675
file name : Image_22032023134711411.png
|
2023-03-22 13:47:11.567889 |
161 |
59318890 |
Construction of Concrete Road from PMGSY Road to House of Ranjit Bera at Akanda Paschim |
307692 |
Construction of Concrete Road from PMGSY Road to House of Ranjit Bera at Akanda Paschim1 |
Completion of work |
-
latitude : 22.08622929,22.0862311
Longitude : 87.35187591,87.35187555
file name : Image_24032023130037722.png
|
2023-03-24 13:00:37.854656 |
162 |
59318890 |
Construction of Concrete Road from PMGSY Road to House of Ranjit Bera at Akanda Paschim |
307692 |
Construction of Concrete Road from PMGSY Road to House of Ranjit Bera at Akanda Paschim1 |
Plinth level |
-
latitude : 22.08630341,22.08630126
Longitude : 87.35188114,87.35187949
file name : Image_24032023132025436.png
|
2023-03-24 13:20:25.534736 |
163 |
59318890 |
Construction of Concrete Road from PMGSY Road to House of Ranjit Bera at Akanda Paschim |
307692 |
Construction of Concrete Road from PMGSY Road to House of Ranjit Bera at Akanda Paschim1 |
Roof laid |
-
latitude : 22.08615262,22.08615365
Longitude : 87.3519413,87.35194143
file name : Image_27032023155901757.png
|
2023-03-27 15:59:01.864116 |
164 |
59607732 |
Construction of Submerssible With Over Head tank & Pipe Line Near House of Khudiram Ghorai at Saljor |
183727 |
Construction of Submerssible With Over Head tank & Pipe Line Near House of Khudiram Ghorai at Saljor1 |
Completion of work |
-
latitude : 22.08775209
Longitude : 87.39923607
file name : Image_25032023164440460.png
|
2023-03-25 16:44:40.565125 |
165 |
59607732 |
Construction of Submerssible With Over Head tank & Pipe Line Near House of Khudiram Ghorai at Saljor |
183727 |
Construction of Submerssible With Over Head tank & Pipe Line Near House of Khudiram Ghorai at Saljor1 |
Plinth level |
-
latitude : 22.08772495
Longitude : 87.39924472
file name : Image_27032023164715750.png
|
2023-03-27 16:47:15.867656 |
166 |
59624878 |
Construction of Submerssible With Over Head tank & Pipe Line Near Maniraj sitala Mandir at Maniraj |
183727 |
Construction of Submerssible With Over Head tank & Pipe Line Near Maniraj sitala Mandir at Maniraj1 |
Completion of work |
-
latitude : 22.11700693
Longitude : 87.35651979
file name : Image_28032023132613411.png
|
2023-03-28 13:26:13.566064 |
167 |
59624878 |
Construction of Submerssible With Over Head tank & Pipe Line Near Maniraj sitala Mandir at Maniraj |
183727 |
Construction of Submerssible With Over Head tank & Pipe Line Near Maniraj sitala Mandir at Maniraj1 |
Plinth level |
-
latitude : 22.11704105
Longitude : 87.35650846
file name : Image_10042023124219778.png
|
2023-04-10 12:42:19.914782 |
168 |
59316500 |
Construction of Concrete Road from House of Prankrishna Pandit to Sattya Senapati at Bakhrabad |
307692 |
Construction of Concrete Road from House of Prankrishna Pandit to Sattya Senapati at Bakhrabad1 |
Completion of work |
-
latitude : 22.1189112,22.1189112
Longitude : 87.369245,87.369245
file name : Image_16052023120445553.png
|
2023-05-16 12:04:45.673009 |
169 |
59627913 |
Construction of Submerssible With Over Head tank & Pipe Line Near House of Panchanan De at Hossenpu |
183727 |
Construction of Submerssible With Over Head tank & Pipe Line Near House of Panchanan De at Hossenpu1 |
Plinth level |
-
latitude : 22.10688021
Longitude : 87.37269926
file name : Image_26042023132520441.png
|
2023-04-26 13:25:20.543112 |
170 |
59627913 |
Construction of Submerssible With Over Head tank & Pipe Line Near House of Panchanan De at Hossenpu |
183727 |
Construction of Submerssible With Over Head tank & Pipe Line Near House of Panchanan De at Hossenpu1 |
Roof laid |
-
latitude : 22.10686913
Longitude : 87.37273753
file name : Image_26042023132704987.png
|
2023-04-26 13:27:05.1025 |
171 |
59627913 |
Construction of Submerssible With Over Head tank & Pipe Line Near House of Panchanan De at Hossenpu |
183727 |
Construction of Submerssible With Over Head tank & Pipe Line Near House of Panchanan De at Hossenpu1 |
Completion of work |
-
latitude : 22.11208165
Longitude : 87.36619461
file name : Image_26042023131918141.png
|
2023-04-26 13:19:18.266147 |
172 |
67035117 |
Const of cc road from house of binod dolai to hose of srimanta dhal at khalina |
338145 |
Const of cc road from house of binod dolai to hose of srimanta dhal at khalina1 |
Completion of work |
-
latitude : 22.1045935,22.1045935
Longitude : 87.41594804,87.41594804
file name : Image_06052023181855074.png
|
2023-05-06 18:18:55.180276 |
173 |
67035869 |
Creation of drainage channel for management of grey water |
348418 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.12947457,22.12947648
Longitude : 87.37398569,87.37398559
file name : Image_13072023132137936.png
|
2023-07-13 13:21:38.043157 |
174 |
59315300 |
Construction of Concrete Road from House of Sankar Barik to High Must Light at Bardai |
307692 |
Construction of Concrete Road from House of Sankar Barik to High Must Light at Bardai1 |
Completion of work |
-
latitude : 22.09727507,22.09727389
Longitude : 87.39627727,87.39628017
file name : Image_21072023104551900.png
|
2023-07-21 10:45:51.996191 |
175 |
59629557 |
Constraction Of Cement Concrete Drain from House of Binoy Shit to Chowberia Sitala Mandair at Korkor |
345458 |
Constraction Of Cement Concrete Drain from House of Binoy Shit to Chowberia Sitala Mandair at Korkor1 |
Completion of work |
-
latitude : 22.10492042
Longitude : 87.38054569
file name : Image_07052023084313031.png
|
2023-05-07 08:43:13.117825 |
176 |
59629557 |
Constraction Of Cement Concrete Drain from House of Binoy Shit to Chowberia Sitala Mandair at Korkor |
345458 |
Constraction Of Cement Concrete Drain from House of Binoy Shit to Chowberia Sitala Mandair at Korkor1 |
Plinth level |
-
latitude : 22.1049359
Longitude : 87.38051671
file name : Image_07052023085128392.png
|
2023-05-07 08:51:28.487035 |
177 |
59629557 |
Constraction Of Cement Concrete Drain from House of Binoy Shit to Chowberia Sitala Mandair at Korkor |
345458 |
Constraction Of Cement Concrete Drain from House of Binoy Shit to Chowberia Sitala Mandair at Korkor1 |
Roof laid |
-
latitude : 22.10500741
Longitude : 87.38056014
file name : Image_08052023170558584.png
|
2023-05-08 17:05:58.748931 |
178 |
67035743 |
Creation of drainage channel for management of grey water |
345458 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.1207264,22.1207264
Longitude : 87.3724916,87.3724916
file name : Image_15052023155342520.png
|
2023-05-15 15:53:42.60608 |
179 |
67035743 |
Creation of drainage channel for management of grey water |
345458 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.1207259,22.1207259
Longitude : 87.3724939,87.3724939
file name : Image_15052023154937287.png
|
2023-05-15 15:49:37.401164 |
180 |
67035743 |
Creation of drainage channel for management of grey water |
345458 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.1207269,22.12035574
Longitude : 87.3724967,87.37367974
file name : Image_07052023093331850.png
|
2023-05-07 09:33:31.944786 |
181 |
59296768 |
Construction of Concrete Road from Dula More to Mantu Manna at Sarasa |
307692 |
Construction of Concrete Road from Dula More to Mantu Manna at Sarasa1 |
Roof laid |
-
latitude : 22.08567689,22.08567554
Longitude : 87.3978711,87.39787312
file name : Image_15052023162807056.png
|
2023-05-15 16:28:07.147547 |
182 |
59296768 |
Construction of Concrete Road from Dula More to Mantu Manna at Sarasa |
307692 |
Construction of Concrete Road from Dula More to Mantu Manna at Sarasa1 |
Plinth level |
-
latitude : 22.08567912,22.08567225
Longitude : 87.39788645,87.39789294
file name : Image_15052023162548711.png
|
2023-05-15 16:25:48.800698 |
183 |
59296768 |
Construction of Concrete Road from Dula More to Mantu Manna at Sarasa |
307692 |
Construction of Concrete Road from Dula More to Mantu Manna at Sarasa1 |
Completion of work |
-
latitude : 22.08564427,22.08564427
Longitude : 87.39788942,87.39788942
file name : Image_02052023112237551.png
|
2023-05-02 11:22:37.65865 |
184 |
68552532 |
Construction of Concrete Road from House of Gobardhan Raul to Sukumar Shit at Saljora |
300000 |
Construction of Concrete Road from House of Gobardhan Raul to Sukumar Shit at Saljora1 |
Completion of work |
-
latitude : 22.08860669,22.08860547
Longitude : 87.39414159,87.39414124
file name : Image_10072023115139605.png
|
2023-07-10 11:51:39.721032 |
185 |
68552532 |
Construction of Concrete Road from House of Gobardhan Raul to Sukumar Shit at Saljora |
300000 |
Construction of Concrete Road from House of Gobardhan Raul to Sukumar Shit at Saljora1 |
Completion of work |
-
latitude : 22.0893871,22.0893871
Longitude : 87.3952075,87.3952075
file name : Image_17072023133354055.png
|
2023-07-17 13:33:54.153515 |
186 |
68964479 |
Creation of a new source of drinking water |
185000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.11206949
Longitude : 87.39225588
file name : Image_05062023152842579.png
|
2023-06-05 15:28:42.735944 |
187 |
68965229 |
Creation of a new source of drinking water |
185000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.11631341
Longitude : 87.37076489
file name : Image_07082023163121437.png
|
2023-08-07 16:31:21.647432 |
188 |
67634917 |
Drinking water facility |
217787 |
Drinking water facility1 |
Plinth level |
-
latitude : 22.08899592
Longitude : 87.37941583
file name : Image_09042024073559773.png
|
2024-04-09 07:35:59.870007 |
189 |
67634917 |
Drinking water facility |
217787 |
Drinking water facility1 |
Completion of work |
-
latitude : 22.08903319
Longitude : 87.37941158
file name : Image_09042024071954820.png
|
2024-04-09 07:19:54.923632 |
190 |
67035684 |
Creation of drainage channel for management of grey water |
345458 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.1161132,22.1161132
Longitude : 87.371167,87.371167
file name : Image_13062023150101731.png
|
2023-06-13 15:01:01.836417 |
191 |
67035684 |
Creation of drainage channel for management of grey water |
345458 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.1164716,22.1161177,22.1161177
Longitude : 87.3717076,87.3711225,87.3711225
file name : Image_13062023150625668.png
|
2023-06-13 15:06:25.77144 |
192 |
67641431 |
Installation of Tubewell |
400000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 22.0890206
Longitude : 87.37941746
file name : Image_09042024073644172.png
|
2024-04-09 07:36:44.250358 |
193 |
67641431 |
Installation of Tubewell |
400000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 22.08899807
Longitude : 87.37943988
file name : Image_09042024072304347.png
|
2024-04-09 07:23:04.442717 |
194 |
67641431 |
Installation of Tubewell |
400000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 22.1164276
Longitude : 87.3707723
file name : Image_09082023155350754.png
|
2023-08-09 15:53:51.241426 |
195 |
68962499 |
Creation of a new source of drinking water |
185000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.10741727
Longitude : 87.40595139
file name : Image_30062023131826175.png
|
2023-06-30 13:18:26.266291 |
196 |
68552433 |
Construction of Concrete Road from House of Jugal barik to Dhobonia Sitala Mandir at Dhobonia |
300000 |
Construction of Concrete Road from House of Jugal barik to Dhobonia Sitala Mandir at Dhobonia1 |
Plinth level |
-
latitude : 22.11041378,22.1104153
Longitude : 87.39054606,87.3905453
file name : Image_01072023094908420.png
|
2023-07-01 09:49:08.520457 |
197 |
68552433 |
Construction of Concrete Road from House of Jugal barik to Dhobonia Sitala Mandir at Dhobonia |
300000 |
Construction of Concrete Road from House of Jugal barik to Dhobonia Sitala Mandir at Dhobonia1 |
Completion of work |
-
latitude : 22.11039434,22.11039947
Longitude : 87.39053177,87.39052888
file name : Image_30062023104053144.png
|
2023-06-30 10:40:53.238383 |
198 |
68552625 |
Construction of Concrete Road from House of Manik Das to House of Jaganath Mandal at Dhobonia Patna |
300000 |
Construction of Concrete Road from House of Manik Das to House of Jaganath Mandal at Dhobonia Patna1 |
Completion of work |
-
latitude : 22.11376717,22.11376789
Longitude : 87.39232877,87.39232802
file name : Image_22062023124113873.png
|
2023-06-22 12:41:13.994125 |
199 |
68552625 |
Construction of Concrete Road from House of Manik Das to House of Jaganath Mandal at Dhobonia Patna |
300000 |
Construction of Concrete Road from House of Manik Das to House of Jaganath Mandal at Dhobonia Patna1 |
Completion of work |
-
latitude : 22.1137595,22.11375876
Longitude : 87.39229838,87.39229831
file name : Image_22062023124103567.png
|
2023-06-22 12:41:03.671318 |
200 |
68552625 |
Construction of Concrete Road from House of Manik Das to House of Jaganath Mandal at Dhobonia Patna |
300000 |
Construction of Concrete Road from House of Manik Das to House of Jaganath Mandal at Dhobonia Patna1 |
Completion of work |
-
latitude : 22.11376717,22.11376789
Longitude : 87.39232877,87.39232802
file name : Image_22062023124056305.png
|
2023-06-22 12:40:56.4304 |
201 |
68552625 |
Construction of Concrete Road from House of Manik Das to House of Jaganath Mandal at Dhobonia Patna |
300000 |
Construction of Concrete Road from House of Manik Das to House of Jaganath Mandal at Dhobonia Patna1 |
Completion of work |
-
latitude : 22.1137595,22.11375876
Longitude : 87.39229838,87.39229831
file name : Image_22062023124043558.png
|
2023-06-22 12:40:43.677002 |
202 |
59315884 |
Construction of Concrete Road from SSK to House of Nimai Tili at Jethageria |
300000 |
Construction of Concrete Road from SSK to House of Nimai Tili at Jethageria1 |
Completion of work |
-
latitude : 22.13085797,22.13085797
Longitude : 87.36868852,87.36868852
file name : Image_22062023124059903.png
|
2023-06-22 12:41:00.011648 |
203 |
59315884 |
Construction of Concrete Road from SSK to House of Nimai Tili at Jethageria |
300000 |
Construction of Concrete Road from SSK to House of Nimai Tili at Jethageria1 |
Completion of work |
-
latitude : 22.13085797,22.13085797
Longitude : 87.36868852,87.36868852
file name : Image_22062023124117620.png
|
2023-06-22 12:41:17.734768 |
204 |
59624079 |
Construction of Submerssible With Over Head tank & Pipe Line Near House of Bamkim Mukharjee at Barda |
183727 |
Construction of Submerssible With Over Head tank & Pipe Line Near House of Bamkim Mukharjee at Barda1 |
Completion of work |
-
latitude : 22.09038122
Longitude : 87.38191424
file name : Image_03072023151131018.png
|
2023-07-03 15:11:31.111911 |
205 |
59318177 |
Construction of Concrete Road from House of Biren Das to Battala at Deula |
300000 |
Construction of Concrete Road from House of Biren Das to Battala at Deula1 |
Completion of work |
-
latitude : 22.08742957,22.08742936
Longitude : 87.39452636,87.39452653
file name : Image_13062023084456256.png
|
2023-06-13 08:44:56.352494 |
206 |
59318177 |
Construction of Concrete Road from House of Biren Das to Battala at Deula |
300000 |
Construction of Concrete Road from House of Biren Das to Battala at Deula1 |
Plinth level |
-
latitude : 22.08742486,22.08742313
Longitude : 87.39450944,87.39451047
file name : Image_13062023085029456.png
|
2023-06-13 08:50:29.545299 |
207 |
59318177 |
Construction of Concrete Road from House of Biren Das to Battala at Deula |
300000 |
Construction of Concrete Road from House of Biren Das to Battala at Deula1 |
Roof laid |
-
latitude : 22.08743722,22.08743722
Longitude : 87.39453503,87.39453503
file name : Image_13062023085301461.png
|
2023-06-13 08:53:01.558347 |
208 |
68964684 |
Creation of a new source of drinking water |
185000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.07938885
Longitude : 87.41257634
file name : Image_09082023112610826.png
|
2023-08-09 11:26:10.945809 |
209 |
67717211 |
Construction of roads |
294314 |
Construction of roads1 |
Plinth level |
-
latitude : 22.10624923,22.10625273
Longitude : 87.40311923,87.40311687
file name : Image_19072024162335598.png
|
2024-07-19 16:23:35.701118 |
210 |
67717211 |
Construction of roads |
294314 |
Construction of roads1 |
Completion of work |
-
latitude : 22.10624575,22.10624659
Longitude : 87.40306437,87.40306597
file name : Image_17072024081029994.png
|
2024-07-17 08:10:30.088524 |
211 |
67717675 |
Construction of roads |
294314 |
Construction of roads1 |
Roof laid |
-
latitude : 22.12084225,22.12084225
Longitude : 87.41258761,87.41258761
file name : Image_24042024160245539.png
|
2024-04-24 16:02:45.642649 |
212 |
67717675 |
Construction of roads |
294314 |
Construction of roads1 |
Plinth level |
-
latitude : 22.12084196,22.12082687
Longitude : 87.41263138,87.41261175
file name : Image_24042024155809518.png
|
2024-04-24 15:58:09.626459 |
213 |
67717675 |
Construction of roads |
294314 |
Construction of roads1 |
Completion of work |
-
latitude : 22.12092415,22.12092415
Longitude : 87.41261652,87.41261652
file name : Image_24042024155127175.png
|
2024-04-24 15:51:27.276551 |
214 |
67035924 |
Creation of drainage channel for management of grey water |
345458 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.087248
Longitude : 87.38823395
file name : Image_03012024133804199.png
|
2024-01-03 13:38:04.303324 |
215 |
67035924 |
Creation of drainage channel for management of grey water |
345458 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.08719665
Longitude : 87.388236
file name : Image_03012024133348914.png
|
2024-01-03 13:33:49.000502 |
216 |
67713057 |
Construction of roads |
297674 |
Construction of roads1 |
Roof laid |
-
latitude : 22.1102372,22.11023717
Longitude : 87.39073802,87.39073796
file name : Image_17042024091408079.png
|
2024-04-17 09:14:08.173853 |
217 |
67713057 |
Construction of roads |
297674 |
Construction of roads1 |
Plinth level |
-
latitude : 22.11031992,22.11031992
Longitude : 87.39070778,87.39070778
file name : Image_15042024153902425.png
|
2024-04-15 15:39:02.521933 |
218 |
67713057 |
Construction of roads |
297674 |
Construction of roads1 |
Completion of work |
-
latitude : 22.11032975,22.11032975
Longitude : 87.39074672,87.39074672
file name : Image_15042024103712894.png
|
2024-04-15 10:37:13.000925 |
219 |
68953360 |
Creation of drainage channel for management of grey water |
320000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 22.08368824
Longitude : 87.37576982
file name : Image_01022024155349458.png
|
2024-02-01 15:53:49.586598 |
220 |
68953360 |
Creation of drainage channel for management of grey water |
320000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 22.08364941
Longitude : 87.37576299
file name : Image_01022024154446084.png
|
2024-02-01 15:44:46.186541 |
221 |
68953360 |
Creation of drainage channel for management of grey water |
320000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.0836527
Longitude : 87.37572377
file name : Image_01022024153100438.png
|
2024-02-01 15:31:00.634776 |
222 |
67826301 |
Connecting septic tanks with soak pits |
400000 |
Connecting septic tanks with soak pits1 |
Plinth level |
-
latitude : 22.08392135
Longitude : 87.41199537
file name : Image_30112023134733292.png
|
2023-11-30 13:47:33.402797 |
223 |
67826301 |
Connecting septic tanks with soak pits |
400000 |
Connecting septic tanks with soak pits1 |
Plinth level |
-
latitude : 22.11030997
Longitude : 87.37777084
file name : Image_15122023155809966.png
|
2023-12-15 15:58:10.07302 |
224 |
67826301 |
Connecting septic tanks with soak pits |
400000 |
Connecting septic tanks with soak pits1 |
Completion of work |
-
latitude : 22.10997847
Longitude : 87.39306079
file name : Image_11112023093735574.png
|
2023-11-11 09:37:35.664616 |
225 |
68953737 |
Operation & maintenance of community compost pits |
150000 |
Operation & maintenance of community compost pits1 |
Plinth level |
-
latitude : 22.10558055
Longitude : 87.37503544
file name : Image_15122023153842289.png
|
2023-12-15 15:38:42.385134 |
226 |
68953737 |
Operation & maintenance of community compost pits |
150000 |
Operation & maintenance of community compost pits1 |
Completion of work |
-
latitude : 22.11008159
Longitude : 87.39307736
file name : Image_11112023100811744.png
|
2023-11-11 10:08:11.834036 |
227 |
68953737 |
Operation & maintenance of community compost pits |
150000 |
Operation & maintenance of community compost pits1 |
Completion of work |
-
latitude : 22.11009528
Longitude : 87.39308747
file name : Image_11112023095227567.png
|
2023-11-11 09:52:27.655939 |
228 |
68953737 |
Operation & maintenance of community compost pits |
150000 |
Operation & maintenance of community compost pits1 |
Completion of work |
-
latitude : 22.11007885
Longitude : 87.39308991
file name : Image_11112023095207606.png
|
2023-11-11 09:52:07.698087 |
229 |
68965389 |
Creation of a new source of drinking water |
185000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.11795663
Longitude : 87.42253779
file name : Image_10112023154921609.png
|
2023-11-10 15:49:21.731376 |
230 |
65493057 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.10978088
Longitude : 87.36928616
file name : Image_23112022163110926.png
|
2022-11-23 16:31:11.02029 |
231 |
65493057 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.10979833
Longitude : 87.36930339
file name : Image_23112022170149259.png
|
2022-11-23 17:01:49.344969 |
232 |
65492870 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.08744017
Longitude : 87.38882205
file name : Image_23112022155225489.png
|
2022-11-23 15:52:25.59452 |
233 |
65492870 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.08747318
Longitude : 87.38884029
file name : Image_23112022155508047.png
|
2022-11-23 15:55:08.147616 |
234 |
65492870 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.08744254
Longitude : 87.38883005
file name : Image_23112022155649698.png
|
2022-11-23 15:56:49.813071 |
235 |
65492910 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.08261216
Longitude : 87.37119629
file name : Image_23112022161051935.png
|
2022-11-23 16:10:52.032861 |
236 |
65492910 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.08263786
Longitude : 87.37112912
file name : Image_23112022161231668.png
|
2022-11-23 16:12:31.748708 |
237 |
65492910 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.08267166
Longitude : 87.37110858
file name : Image_23112022161404889.png
|
2022-11-23 16:14:04.983696 |
238 |
65492985 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.11530759
Longitude : 87.35729642
file name : Image_23112022170211127.png
|
2022-11-23 17:02:11.208832 |
239 |
65492985 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.1153125
Longitude : 87.357283
file name : Image_23112022170319543.png
|
2022-11-23 17:03:19.623445 |
240 |
65492985 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.11531389
Longitude : 87.35732438
file name : Image_23112022170440302.png
|
2022-11-23 17:04:40.39816 |
241 |
65492939 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.08383845
Longitude : 87.39922242
file name : Image_23112022153028288.png
|
2022-11-23 15:30:28.397071 |
242 |
65492939 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.08381958
Longitude : 87.39921156
file name : Image_23112022153529976.png
|
2022-11-23 15:35:30.072212 |
243 |
65492939 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.08382229
Longitude : 87.39923081
file name : Image_23112022153723760.png
|
2022-11-23 15:37:23.865149 |
244 |
67793866 |
Drainage Construction |
310597 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.10842595
Longitude : 87.42149689
file name : Image_29122023113530219.png
|
2023-12-29 11:35:30.307779 |
245 |
67793866 |
Drainage Construction |
310597 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.10838188
Longitude : 87.42170708
file name : Image_29122023113023857.png
|
2023-12-29 11:30:23.967495 |
246 |
67793866 |
Drainage Construction |
310597 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.10838846
Longitude : 87.42151606
file name : Image_29122023112659957.png
|
2023-12-29 11:27:00.048814 |
247 |
67793586 |
Drainage Construction |
310597 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.1063751
Longitude : 87.39226164
file name : Image_28062024171618358.png
|
2024-06-28 17:16:18.460657 |
248 |
67793586 |
Drainage Construction |
310597 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.10416136
Longitude : 87.41529756
file name : Image_29122023115126731.png
|
2023-12-29 11:51:26.82981 |
249 |
67793586 |
Drainage Construction |
310597 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.10406993
Longitude : 87.41529911
file name : Image_29122023111838246.png
|
2023-12-29 11:18:38.337726 |
250 |
67635716 |
Drinking water facility |
217787 |
Drinking water facility1 |
Plinth level |
-
latitude : 22.08221089
Longitude : 87.37031384
file name : Image_02012024164421318.png
|
2024-01-02 16:44:21.399728 |
251 |
67635716 |
Drinking water facility |
217787 |
Drinking water facility1 |
Completion of work |
-
latitude : 22.0818966
Longitude : 87.3709423
file name : Image_02012024161811393.png
|
2024-01-02 16:18:11.479369 |
252 |
67636043 |
Drinking water facility |
217787 |
Drinking water facility1 |
Roof laid |
-
latitude : 22.11030054
Longitude : 87.38938648
file name : Image_17042024092552911.png
|
2024-04-17 09:25:53.004511 |
253 |
67636043 |
Drinking water facility |
217787 |
Drinking water facility1 |
Plinth level |
-
latitude : 22.11029859
Longitude : 87.38935774
file name : Image_17042024091953433.png
|
2024-04-17 09:19:53.520914 |
254 |
67636043 |
Drinking water facility |
217787 |
Drinking water facility1 |
Completion of work |
-
latitude : 22.11032123
Longitude : 87.38930303
file name : Image_15032024112357713.png
|
2024-03-15 11:23:57.821117 |
255 |
67636447 |
Drinking water facility |
217787 |
Drinking water facility1 |
Plinth level |
-
latitude : 22.08741117
Longitude : 87.39073142
file name : Image_05022024132308899.png
|
2024-02-05 13:23:09.011258 |
256 |
67636447 |
Drinking water facility |
217787 |
Drinking water facility1 |
Completion of work |
-
latitude : 22.08732879
Longitude : 87.39080604
file name : Image_08012024143143993.png
|
2024-01-08 14:31:44.176413 |
257 |
67639056 |
Drinking water facility |
217787 |
Drinking water facility1 |
Plinth level |
-
latitude : 22.10635121
Longitude : 87.40309396
file name : Image_29122023121833392.png
|
2023-12-29 12:18:33.489598 |
258 |
67639056 |
Drinking water facility |
217787 |
Drinking water facility1 |
Completion of work |
-
latitude : 22.10639932
Longitude : 87.40299839
file name : Image_29122023121237075.png
|
2023-12-29 12:12:37.171699 |
259 |
67637459 |
Drinking water facility |
217787 |
Drinking water facility1 |
Plinth level |
-
latitude : 22.13130321
Longitude : 87.3732628
file name : Image_13012024121241378.png
|
2024-01-13 12:12:41.477027 |
260 |
67637459 |
Drinking water facility |
217787 |
Drinking water facility1 |
Plinth level |
-
latitude : 22.13134252
Longitude : 87.37327788
file name : Image_13012024121236795.png
|
2024-01-13 12:12:36.892581 |
261 |
67637459 |
Drinking water facility |
217787 |
Drinking water facility1 |
Completion of work |
-
latitude : 22.13131902
Longitude : 87.37330447
file name : Image_11012024145027048.png
|
2024-01-11 14:50:27.137208 |
262 |
67634571 |
Drinking water facility |
217787 |
Drinking water facility1 |
Plinth level |
-
latitude : 22.1157874
Longitude : 87.3722062
file name : Image_01022024170909036.png
|
2024-02-01 17:09:09.122584 |
263 |
67634571 |
Drinking water facility |
217787 |
Drinking water facility1 |
Completion of work |
-
latitude : 22.1162389
Longitude : 87.3725438
file name : Image_01022024161032893.png
|
2024-02-01 16:10:33.017934 |
264 |
67634571 |
Drinking water facility |
217787 |
Drinking water facility1 |
Completion of work |
-
latitude : 22.1161586
Longitude : 87.3727403
file name : Image_26122023134634256.png
|
2023-12-26 13:46:34.360103 |
265 |
67716927 |
Construction of roads |
308073 |
Construction of roads1 |
Roof laid |
-
latitude : 22.11445475,22.11445474
Longitude : 87.39019882,87.39019881
file name : Image_27122023171646841.png
|
2023-12-27 17:16:46.928266 |
266 |
67716927 |
Construction of roads |
308073 |
Construction of roads1 |
Plinth level |
-
latitude : 22.1114526,22.1114526
Longitude : 87.389621,87.389621
file name : Image_27122023171255588.png
|
2023-12-27 17:12:55.676234 |
267 |
67716927 |
Construction of roads |
308073 |
Construction of roads1 |
Completion of work |
-
latitude : 22.11451197,22.11454872
Longitude : 87.39008066,87.39000504
file name : Image_20122023113651986.png
|
2023-12-20 11:36:52.080569 |
268 |
67710563 |
Construction of roads |
303878 |
Construction of roads1 |
Roof laid |
-
latitude : 22.10605605,22.10605796
Longitude : 87.37151475,87.37151413
file name : Image_27122023174121273.png
|
2023-12-27 17:41:21.457032 |
269 |
67710563 |
Construction of roads |
303878 |
Construction of roads1 |
Plinth level |
-
latitude : 22.1060041,22.10600308
Longitude : 87.3715629,87.37156394
file name : Image_27122023173917932.png
|
2023-12-27 17:39:18.090155 |
270 |
67710563 |
Construction of roads |
303878 |
Construction of roads1 |
Completion of work |
-
latitude : 22.10596174,22.10596221
Longitude : 87.3715067,87.37150673
file name : Image_22122023113907811.png
|
2023-12-22 11:39:07.916059 |
271 |
67726318 |
Construction of roads |
303878 |
Construction of roads1 |
Roof laid |
-
latitude : 22.10501235,22.1050136
Longitude : 87.37526092,87.37525918
file name : Image_27122023173221772.png
|
2023-12-27 17:32:21.979594 |
272 |
67726318 |
Construction of roads |
303878 |
Construction of roads1 |
Plinth level |
-
latitude : 22.1050234,22.105023
Longitude : 87.37528486,87.37528519
file name : Image_27122023173021066.png
|
2023-12-27 17:30:21.260526 |
273 |
67726318 |
Construction of roads |
303878 |
Construction of roads1 |
Completion of work |
-
latitude : 22.1050214,22.10502141
Longitude : 87.37514387,87.37514387
file name : Image_24122023124641329.png
|
2023-12-24 12:46:40.171534 |
274 |
67724555 |
Construction of Building |
349102 |
Construction of Building1 |
Plinth level |
-
latitude : 22.1164262
Longitude : 87.3707676
file name : Image_16022024163955735.png
|
2024-02-16 16:39:55.829654 |
275 |
67724555 |
Construction of Building |
349102 |
Construction of Building1 |
Completion of work |
-
latitude : 22.1164266
Longitude : 87.3707553
file name : Image_16022024163041467.png
|
2024-02-16 16:30:41.684389 |
276 |
67724555 |
Construction of Building |
349102 |
Construction of Building1 |
Completion of work |
-
latitude : 22.1164248
Longitude : 87.3707585
file name : Image_16022024143539047.png
|
2024-02-16 14:35:39.153399 |
277 |
66980631 |
Operation & maintenance of community compost pits |
140000 |
Operation & maintenance of community compost pits1 |
Completion of work |
-
latitude : 22.1171977
Longitude : 87.3689426
file name : Image_03032023160216292.png
|
2023-03-03 16:02:16.381322 |
278 |
67793387 |
Drainage Construction |
310597 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.08805144
Longitude : 87.40211447
file name : Image_22042024154909055.png
|
2024-04-22 15:49:09.139027 |
279 |
67793387 |
Drainage Construction |
310597 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.08828056
Longitude : 87.40221154
file name : Image_03042024090821683.png
|
2024-04-03 09:08:21.795274 |
280 |
67639654 |
Drinking water facility |
217787 |
Drinking water facility1 |
Plinth level |
-
latitude : 22.09454451
Longitude : 87.38748615
file name : Image_08062024102130574.png
|
2024-06-08 10:21:30.708212 |
281 |
67639654 |
Drinking water facility |
217787 |
Drinking water facility1 |
Completion of work |
-
latitude : 22.09450078
Longitude : 87.38752513
file name : Image_07062024163455929.png
|
2024-06-07 16:34:56.040884 |
282 |
67637746 |
Drinking water facility |
217787 |
Drinking water facility1 |
Roof laid |
-
latitude : 22.09093665
Longitude : 87.39424983
file name : Image_07062024154140706.png
|
2024-06-07 15:41:40.799494 |
283 |
67637746 |
Drinking water facility |
217787 |
Drinking water facility1 |
Plinth level |
-
latitude : 22.09095267
Longitude : 87.39427648
file name : Image_07062024153633762.png
|
2024-06-07 15:36:33.872266 |
284 |
67637746 |
Drinking water facility |
217787 |
Drinking water facility1 |
Completion of work |
-
latitude : 22.09097343
Longitude : 87.39422157
file name : Image_07062024151448687.png
|
2024-06-07 15:14:48.788845 |
285 |
67633480 |
Drinking water facility |
217787 |
Drinking water facility1 |
Roof laid |
-
latitude : 22.08110932
Longitude : 87.39501269
file name : Image_14062024182004722.png
|
2024-06-14 18:20:04.829606 |
286 |
67633480 |
Drinking water facility |
217787 |
Drinking water facility1 |
Plinth level |
-
latitude : 22.08111994
Longitude : 87.3950109
file name : Image_14062024181608733.png
|
2024-06-14 18:16:08.83095 |
287 |
67633480 |
Drinking water facility |
217787 |
Drinking water facility1 |
Completion of work |
-
latitude : 22.08108588
Longitude : 87.39499968
file name : Image_14062024181302709.png
|
2024-06-14 18:13:02.80854 |
288 |
67638421 |
Drinking water facility |
217787 |
Drinking water facility1 |
Roof laid |
-
latitude : 22.11739152
Longitude : 87.36897295
file name : Image_15062024174537290.png
|
2024-06-15 17:45:37.39306 |
289 |
67638421 |
Drinking water facility |
217787 |
Drinking water facility1 |
Plinth level |
-
latitude : 22.11145622
Longitude : 87.39029984
file name : Image_14062024184328152.png
|
2024-06-14 18:43:28.288274 |
290 |
67638421 |
Drinking water facility |
217787 |
Drinking water facility1 |
Completion of work |
-
latitude : 22.11147154
Longitude : 87.39026803
file name : Image_14062024184030138.png
|
2024-06-14 18:40:30.282735 |
291 |
59621586 |
Construction of Submerssible With Over Head tank & Pipe Line Near House of Sundarpur Sitala Mandir a |
183727 |
Construction of Submerssible With Over Head tank & Pipe Line Near House of Sundarpur Sitala Mandir a1 |
Plinth level |
-
latitude : 22.10781152
Longitude : 87.42342486
file name : Image_06052023173718998.png
|
2023-05-06 17:37:19.111801 |
292 |
59621586 |
Construction of Submerssible With Over Head tank & Pipe Line Near House of Sundarpur Sitala Mandir a |
183727 |
Construction of Submerssible With Over Head tank & Pipe Line Near House of Sundarpur Sitala Mandir a1 |
Completion of work |
-
latitude : 22.10784679
Longitude : 87.42341064
file name : Image_06052023165509079.png
|
2023-05-06 16:55:09.180607 |
293 |
65491237 |
Repair of Moorum Road from Khirishchati to Saraswati Ghosh at Bakhrabad |
97855 |
Repair of Moorum Road from Khirishchati to Saraswati Ghosh at Bakhrabad 1 |
Plinth level |
-
latitude : 22.12875511,22.12875507
Longitude : 87.37368174,87.37368175
file name : Image_22062023124021047.png
|
2023-06-22 12:40:21.182408 |
294 |
65491237 |
Repair of Moorum Road from Khirishchati to Saraswati Ghosh at Bakhrabad |
97855 |
Repair of Moorum Road from Khirishchati to Saraswati Ghosh at Bakhrabad 1 |
Completion of work |
-
latitude : 22.12876686,22.1287722
Longitude : 87.37363701,87.37364738
file name : Image_13062023153624281.png
|
2023-06-13 15:36:24.38141 |
295 |
65491237 |
Repair of Moorum Road from Khirishchati to Saraswati Ghosh at Bakhrabad |
97855 |
Repair of Moorum Road from Khirishchati to Saraswati Ghosh at Bakhrabad 1 |
Plinth level |
-
latitude : 22.12876331,22.12876331
Longitude : 87.37367369,87.37367369
file name : Image_13062023153928167.png
|
2023-06-13 15:39:28.269682 |
296 |
67718073 |
Construction of roads |
303878 |
Construction of roads1 |
Roof laid |
-
latitude : 22.10241306,22.10241313
Longitude : 87.3970469,87.3970469
file name : Image_27122023165848780.png
|
2023-12-27 16:58:48.870423 |
297 |
67718073 |
Construction of roads |
303878 |
Construction of roads1 |
Plinth level |
-
latitude : 22.10242792,22.10242518
Longitude : 87.39699944,87.39700016
file name : Image_27122023165643715.png
|
2023-12-27 16:56:43.815582 |
298 |
67718073 |
Construction of roads |
303878 |
Construction of roads1 |
Completion of work |
-
latitude : 22.10242249,22.10242249
Longitude : 87.39707906,87.39707906
file name : Image_24122023142554329.png
|
2023-12-24 14:25:54.05723 |
299 |
67793141 |
Drainage Construction |
313795 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.12742807
Longitude : 87.37802784
file name : Image_11072024152634156.png
|
2024-07-11 15:26:34.260221 |
300 |
67793141 |
Drainage Construction |
313795 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.1164167
Longitude : 87.370775
file name : Image_08072024122829987.png
|
2024-07-08 12:28:30.084733 |
301 |
67792636 |
Drainage Construction |
313795 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.11678535
Longitude : 87.35993927
file name : Image_27082024162236962.png
|
2024-08-27 16:22:37.358392 |
302 |
67792636 |
Drainage Construction |
313795 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.11678664
Longitude : 87.35990674
file name : Image_27082024135334949.png
|
2024-08-27 13:53:35.740773 |
303 |
67792456 |
Drainage Construction |
313795 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.10922514
Longitude : 87.37030022
file name : Image_16072024175422542.png
|
2024-07-16 17:54:22.635449 |
304 |
67792456 |
Drainage Construction |
313795 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.1092176
Longitude : 87.37031696
file name : Image_16072024175200090.png
|
2024-07-16 17:52:00.192017 |
305 |
67792456 |
Drainage Construction |
313795 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.10917166
Longitude : 87.37032095
file name : Image_16072024174754537.png
|
2024-07-16 17:47:54.623745 |
306 |
88820438 |
Construction of roads |
304717 |
Construction of roads1 |
Roof laid |
-
latitude : 22.08542749,22.08542743
Longitude : 87.35337545,87.35337554
file name : Image_12082024131220675.png
|
2024-08-12 13:12:20.77806 |
307 |
88820438 |
Construction of roads |
304717 |
Construction of roads1 |
Plinth level |
-
latitude : 22.08542822,22.0854282
Longitude : 87.35331585,87.35331581
file name : Image_12082024130958305.png
|
2024-08-12 13:09:58.388374 |
308 |
88820438 |
Construction of roads |
304717 |
Construction of roads1 |
Completion of work |
-
latitude : 22.08551209,22.0854685
Longitude : 87.3533639,87.35337007
file name : Image_12082024130358509.png
|
2024-08-12 13:03:58.616411 |