1 |
34892593 |
Construction of PCC road from Jakar house towards Sahabul house |
126805 |
Construction of PCC road from Jakar house towards Sahabul house 1 |
Plinth level |
-
latitude : 23.91445626039058,23.914460870437324
Longitude : 88.28021510504186,88.28010907396674
file name : Image_18022021180702589.png
|
2021-02-18 18:07:02.672401 |
2 |
34892593 |
Construction of PCC road from Jakar house towards Sahabul house |
126805 |
Construction of PCC road from Jakar house towards Sahabul house 1 |
Completion of work |
-
latitude : 23.914421978406608,23.914460828527808
Longitude : 88.28017378225923,88.28011259436607
file name : Image_11022021115515673.png
|
2021-02-11 11:55:15.781913 |
3 |
34900182 |
Construction of PCC road from Maslim Sk house towards Najrul police house |
206298 |
Construction of PCC road from Maslim Sk house towards Najrul police house1 |
Plinth level |
-
latitude : 23.903366709128022,23.912139083258808
Longitude : 88.28441477380693,88.28583139926195
file name : Image_18022021180653609.png
|
2021-02-18 18:06:53.719489 |
4 |
34900182 |
Construction of PCC road from Maslim Sk house towards Najrul police house |
206298 |
Construction of PCC road from Maslim Sk house towards Najrul police house1 |
Completion of work |
-
latitude : 23.91220177989453,23.912206809036434
Longitude : 88.28560777008533,88.28568429686129
file name : Image_11022021115502237.png
|
2021-02-11 11:55:02.348019 |
5 |
34778818 |
Construction of PCC road from Mator Mondal house towards Duman |
202668 |
Construction of PCC road from Mator Mondal house towards Duman 1 |
Plinth level |
-
latitude : 23.91407764982432,23.914064532145858
Longitude : 88.25939889997244,88.25946888886392
file name : Image_25022021162110178.png
|
2021-02-25 16:21:10.262537 |
6 |
34778818 |
Construction of PCC road from Mator Mondal house towards Duman |
202668 |
Construction of PCC road from Mator Mondal house towards Duman 1 |
Completion of work |
-
latitude : 23.914020527154207,23.914020527154207
Longitude : 88.25944541953504,88.25944541953504
file name : Image_11022021115523771.png
|
2021-02-11 11:55:23.879989 |
7 |
34809352 |
Construction of PCC road from Jahed Ali house at Kader Ali house Jitpur Dighirpara |
152583 |
Construction of PCC road from Jahed Ali house at Kader Ali house Jitpur Dighirpara1 |
Plinth level |
-
latitude : 23.90479117166251,23.904798924922943
Longitude : 88.27578300610185,88.27579800970852
file name : Image_18022021180708361.png
|
2021-02-18 18:07:08.446006 |
8 |
34809352 |
Construction of PCC road from Jahed Ali house at Kader Ali house Jitpur Dighirpara |
152583 |
Construction of PCC road from Jahed Ali house at Kader Ali house Jitpur Dighirpara1 |
Completion of work |
-
latitude : 23.904825998470187,23.904803534969687
Longitude : 88.27574335969985,88.27574168331921
file name : Image_11022021115519831.png
|
2021-02-11 11:55:19.94975 |
9 |
34862372 |
Construction of PCC road from main road towards Golam house |
94076 |
Construction of PCC road from main road towards Golam house1 |
Plinth level |
-
latitude : 23.896490363404155,23.896526908501983
Longitude : 88.24724690057337,88.24723499827087
file name : Image_25022021162116127.png
|
2021-02-25 16:21:16.220667 |
10 |
34862372 |
Construction of PCC road from main road towards Golam house |
94076 |
Construction of PCC road from main road towards Golam house1 |
Completion of work |
-
latitude : 23.9045199,23.9045199
Longitude : 88.2505115,88.2505115
file name : Image_11022021115532155.png
|
2021-02-11 11:55:32.268904 |
11 |
34779529 |
Construction of PCC road from Rejaul Sk house towards Jeker Ali ho |
194849 |
Construction of PCC road from Rejaul Sk house towards Jeker Ali ho1 |
Plinth level |
-
latitude : 23.9142195135355,23.91412370838225
Longitude : 88.26701503247023,88.26689198613167
file name : Image_09032021113757881.png
|
2021-03-09 11:37:57.993346 |
12 |
34779529 |
Construction of PCC road from Rejaul Sk house towards Jeker Ali ho |
194849 |
Construction of PCC road from Rejaul Sk house towards Jeker Ali ho1 |
Plinth level |
-
latitude : 23.91415262594819,23.914248724468052
Longitude : 88.2669124379754,88.26690816320479
file name : Image_09032021113802783.png
|
2021-03-09 11:38:02.88135 |
13 |
34779529 |
Construction of PCC road from Rejaul Sk house towards Jeker Ali ho |
194849 |
Construction of PCC road from Rejaul Sk house towards Jeker Ali ho1 |
Completion of work |
-
latitude : 23.914269427768886,23.91423497814685
Longitude : 88.2669523358345,88.26689307577908
file name : Image_11022021115527762.png
|
2021-02-11 11:55:27.886504 |
14 |
34881761 |
Construction of PCC road from main road near Alimuddin shop towards Rajab Ali house |
241188 |
Construction of PCC road from main road near Alimuddin shop towards Rajab Ali house1 |
Plinth level |
-
latitude : 23.913099942728877,23.91309332102537
Longitude : 88.28212911263108,88.2821716926992
file name : Image_18022021180705505.png
|
2021-02-18 18:07:05.59333 |
15 |
34881761 |
Construction of PCC road from main road near Alimuddin shop towards Rajab Ali house |
241188 |
Construction of PCC road from main road near Alimuddin shop towards Rajab Ali house1 |
Completion of work |
-
latitude : 23.913167333230376,23.9138269
Longitude : 88.28209575265646,88.2794717
file name : Image_11022021115511605.png
|
2021-02-11 11:55:11.713503 |
16 |
34805981 |
Construction of PCC road from Hazrat house towards Ekindar house . |
130683 |
Construction of PCC road from Hazrat house towards Ekindar house .1 |
Plinth level |
-
latitude : 23.910102155059576,23.910140208899975
Longitude : 88.26733974739909,88.26732533052564
file name : Image_18022021180656614.png
|
2021-02-18 18:06:56.71064 |
17 |
34805981 |
Construction of PCC road from Hazrat house towards Ekindar house . |
130683 |
Construction of PCC road from Hazrat house towards Ekindar house .1 |
Completion of work |
-
latitude : 23.9116541,23.9116541
Longitude : 88.2710096,88.2710096
file name : Image_11022021115453052.png
|
2021-02-11 11:54:53.162576 |
18 |
34895156 |
Construction of PCC road from Raihan house towards Majid house |
84247 |
Construction of PCC road from Raihan house towards Majid house1 |
Plinth level |
-
latitude : 23.9119679,23.9119682
Longitude : 88.2849916,88.2849927
file name : Image_18022021180711232.png
|
2021-02-18 18:07:11.314674 |
19 |
34895156 |
Construction of PCC road from Raihan house towards Majid house |
84247 |
Construction of PCC road from Raihan house towards Majid house1 |
Completion of work |
-
latitude : 23.9119677,23.91194965224713
Longitude : 88.2849925,88.28493461944163
file name : Image_11022021115457792.png
|
2021-02-11 11:54:57.905649 |
20 |
34898459 |
Construction of PCC road from main road towards Mursalim house |
102840 |
Construction of PCC road from main road towards Mursalim house1 |
Plinth level |
-
latitude : 23.90636110212654,23.906363868154585
Longitude : 88.28438057564199,88.28436154872179
file name : Image_18022021180659593.png
|
2021-02-18 18:06:59.675607 |
21 |
34898459 |
Construction of PCC road from main road towards Mursalim house |
102840 |
Construction of PCC road from main road towards Mursalim house1 |
Completion of work |
-
latitude : 23.906261273659766,23.90632053371519,23.90632174909115
Longitude : 88.28423414379358,88.28440320678055,88.28440077602863
file name : Image_11022021115540113.png
|
2021-02-11 11:55:40.223895 |
22 |
34879577 |
Construction of PCC road from Jullu shop towards Jullu Biswas house |
114969 |
Construction of PCC road from Jullu shop towards Jullu Biswas house1 |
Plinth level |
-
latitude : 23.912931634113193,23.912933352403343
Longitude : 88.28262599185109,88.28269774094224
file name : Image_25022021162104147.png
|
2021-02-25 16:21:04.23612 |
23 |
34879577 |
Construction of PCC road from Jullu shop towards Jullu Biswas house |
114969 |
Construction of PCC road from Jullu shop towards Jullu Biswas house1 |
Completion of work |
-
latitude : 23.9138299,23.9138293
Longitude : 88.279478,88.279478
file name : Image_11022021115507410.png
|
2021-02-11 11:55:07.522469 |
24 |
34780112 |
Construction of PCC road from main road towards Kudrut house at |
178348 |
Construction of PCC road from main road towards Kudrut house at 1 |
Completion of work |
-
latitude : 23.912203456275165,23.912243857048452
Longitude : 88.26995515264571,88.27000209130347
file name : Image_11022021213739287.png
|
2021-02-11 21:37:39.397486 |
25 |
34834090 |
Construction of PCC road from main road towards Graveyard at Nababbari Purba |
186216 |
Construction of PCC road from main road towards Graveyard at Nababbari Purba1 |
Plinth level |
-
latitude : 23.9116624,23.9116629
Longitude : 88.2536325,88.2536276
file name : Image_25022021162122055.png
|
2021-02-25 16:21:22.146573 |
26 |
34834090 |
Construction of PCC road from main road towards Graveyard at Nababbari Purba |
186216 |
Construction of PCC road from main road towards Graveyard at Nababbari Purba1 |
Completion of work |
-
latitude : 23.9116531,23.9116531,23.91186357010156
Longitude : 88.2536881,88.2536881,88.2536934223026
file name : Image_11022021213725919.png
|
2021-02-11 21:37:26.021171 |
27 |
34834501 |
Construction of PCC road from main road towards Kiram house at Nababbari Purba |
106676 |
Construction of PCC road from main road towards Kiram house at Nababbari Purba1 |
Completion of work |
-
latitude : 23.912590784020722,23.912606458179653
Longitude : 88.25397413223982,88.25393976643682
file name : Image_11022021213733935.png
|
2021-02-11 21:37:34.041359 |
28 |
34835904 |
Construction of PCC road from Bhasarul house towards Najrul house |
172759 |
Construction of PCC road from Bhasarul house towards Najrul house 1 |
Completion of work |
-
latitude : 23.90254297759384,23.9044193
Longitude : 88.25104339979589,88.2505809
file name : Image_11022021213718369.png
|
2021-02-11 21:37:18.510303 |
29 |
34837773 |
Construction of PCC road from Badar house towards Asraful ho |
113712 |
Construction of PCC road from Badar house towards Asraful ho1 |
Plinth level |
-
latitude : 23.901838227175176,23.901887093670666
Longitude : 88.24910768307745,88.24907097034156
file name : Image_25022021162113190.png
|
2021-02-25 16:21:13.281066 |
30 |
34837773 |
Construction of PCC road from Badar house towards Asraful ho |
113712 |
Construction of PCC road from Badar house towards Asraful ho1 |
Completion of work |
-
latitude : 23.901905450038612,23.901938810013235
Longitude : 88.2490676175803,88.24906066060066
file name : Image_11022021213752803.png
|
2021-02-11 21:37:52.91222 |
31 |
34878042 |
Construction of PCC road from Jakkar house towards Chhahad house |
125063 |
Construction of PCC road from Jakkar house towards Chhahad house1 |
Plinth level |
-
latitude : 23.911032336764038,23.911061631515622
Longitude : 88.27286928892136,88.27287783846259
file name : Image_25022021162119022.png
|
2021-02-25 16:21:19.108756 |
32 |
34878042 |
Construction of PCC road from Jakkar house towards Chhahad house |
125063 |
Construction of PCC road from Jakkar house towards Chhahad house1 |
Completion of work |
-
latitude : 23.9117479,23.91108945943415
Longitude : 88.2724666,88.27280248515308
file name : Image_11022021213747166.png
|
2021-02-11 21:37:47.267973 |
33 |
34865678 |
Construction of PCC road from main road towards Chhayan land via Aman house |
255198 |
Construction of PCC road from main road towards Chhayan land via Aman house1 |
Plinth level |
-
latitude : 23.89956723432988,23.89955378137529
Longitude : 88.25033982284367,88.25036169961095
file name : Image_25022021162107164.png
|
2021-02-25 16:21:07.257398 |
34 |
34865678 |
Construction of PCC road from main road towards Chhayan land via Aman house |
255198 |
Construction of PCC road from main road towards Chhayan land via Aman house1 |
Completion of work |
-
latitude : 23.8989304,23.8989304
Longitude : 88.2497781,88.2497746
file name : Image_12022021101045283.png
|
2021-02-12 10:10:45.364585 |
35 |
39125295 |
Construction of PCC road from main road towards Anar Ali house at Kapasdanga Majhpara Uttar |
131093 |
Construction of PCC road from main road towards Anar Ali house at Kapasdanga Majhpara Uttar1 |
Plinth level |
-
latitude : 23.909266982227564,23.909234586171806
Longitude : 88.27866336330771,88.27856965363026
file name : Image_25022021162101204.png
|
2021-02-25 16:21:01.292978 |
36 |
39125295 |
Construction of PCC road from main road towards Anar Ali house at Kapasdanga Majhpara Uttar |
131093 |
Construction of PCC road from main road towards Anar Ali house at Kapasdanga Majhpara Uttar1 |
Completion of work |
-
latitude : 23.90917293727398,23.90917293727398
Longitude : 88.27861843630672,88.27861843630672
file name : Image_11022021213758661.png
|
2021-02-11 21:37:58.781176 |
37 |
34750723 |
Construction of PCC road from main road towards Vikuram Mondal |
194186 |
Construction of PCC road from main road towards Vikuram Mondal 1 |
Completion of work |
-
latitude : 23.913319339044392,23.91323539428413
Longitude : 88.26306086964905,88.2630276773125
file name : Image_28012021171510286.png
|
2021-01-28 17:15:10.384167 |
38 |
39123820 |
Construction of drain with slab from Morjem house towards Arman house at Kapasdanga Majhpara Uttar |
147787 |
Construction of drain with slab from Morjem house towards Arman house at Kapasdanga Majhpara Uttar1 |
Plinth level |
-
latitude : 23.9136626617983,23.913756371475756
Longitude : 88.27530364505947,88.27528595924377
file name : Image_09032021113734258.png
|
2021-03-09 11:37:34.368957 |
39 |
39123820 |
Construction of drain with slab from Morjem house towards Arman house at Kapasdanga Majhpara Uttar |
147787 |
Construction of drain with slab from Morjem house towards Arman house at Kapasdanga Majhpara Uttar1 |
Completion of work |
-
latitude : 23.913679970428348,23.913635001517832,23.91362896654755
Longitude : 88.27535226009786,88.27534438110888,88.27531311661005
file name : Image_27022021082955956.png
|
2021-02-27 08:29:56.060477 |
40 |
34884653 |
Construction of drain from Nasir house towards Ekramul house |
109330 |
Construction of drain from Nasir house towards Ekramul house1 |
Plinth level |
-
latitude : 23.91294320113957,23.912929496727884
Longitude : 88.28286252915859,88.28283570706844
file name : Image_03062021114825342.png
|
2021-06-03 11:48:25.440743 |
41 |
34884653 |
Construction of drain from Nasir house towards Ekramul house |
109330 |
Construction of drain from Nasir house towards Ekramul house1 |
Completion of work |
-
latitude : 23.912971657700837,23.912982470355928
Longitude : 88.2827880140394,88.28276169486344
file name : Image_05032021130949467.png
|
2021-03-05 13:09:49.564352 |
42 |
34818234 |
Construction of side and cross drain near Banamali Master house |
252137 |
Construction of side and cross drain near Banamali Master house 1 |
Plinth level |
-
latitude : 23.9122611656785,23.909755269996822
Longitude : 88.27579122036695,88.25463378801942
file name : Image_09032021113748418.png
|
2021-03-09 11:37:48.52648 |
43 |
34818234 |
Construction of side and cross drain near Banamali Master house |
252137 |
Construction of side and cross drain near Banamali Master house 1 |
Completion of work |
-
latitude : 23.90975489281118,23.909744499251246
Longitude : 88.25461174361408,88.2545486278832
file name : Image_27022021082951160.png
|
2021-02-27 08:29:51.292073 |
44 |
34776512 |
Construction of drain with slab from Dayal Hazra house towards Debabrata Mondal house at N |
140832 |
Construction of drain with slab from Dayal Hazra house towards Debabrata Mondal house at N1 |
Plinth level |
-
latitude : 23.914279066957533,23.91427760012448
Longitude : 88.26391138136387,88.2639096211642
file name : Image_03062021103024395.png
|
2021-06-03 10:30:24.494725 |
45 |
34776512 |
Construction of drain with slab from Dayal Hazra house towards Debabrata Mondal house at N |
140832 |
Construction of drain with slab from Dayal Hazra house towards Debabrata Mondal house at N1 |
Completion of work |
-
latitude : 23.9144629240036,23.91442822292447
Longitude : 88.26397215016186,88.26387969776988
file name : Image_27022021082945733.png
|
2021-02-27 08:29:45.844907 |
46 |
34808731 |
Construction of drain from Shukur house towards Kadar house |
281429 |
Construction of drain from Shukur house towards Kadar house 1 |
Plinth level |
-
latitude : 23.9101785980165,23.910208311863244,23.910208311863244
Longitude : 88.26728333719075,88.26731711626053,88.26731711626053
file name : Image_03062021101216867.png
|
2021-06-03 10:12:16.94809 |
47 |
34831646 |
Construction of cross drain near Hossainpur Dakshinpara Mandir towards Panchanan via subhen |
216872 |
Construction of cross drain near Hossainpur Dakshinpara Mandir towards Panchanan via subhen1 |
Plinth level |
-
latitude : 23.907993184402585,23.90802055131644
Longitude : 88.2544997613877,88.25451971031725
file name : Image_09032021113729619.png
|
2021-03-09 11:37:29.71741 |
48 |
34831646 |
Construction of cross drain near Hossainpur Dakshinpara Mandir towards Panchanan via subhen |
216872 |
Construction of cross drain near Hossainpur Dakshinpara Mandir towards Panchanan via subhen1 |
Completion of work |
-
latitude : 23.908043559640646,23.908055420033634
Longitude : 88.2545446883887,88.25455415993929
file name : Image_02032021162050995.png
|
2021-03-02 16:20:51.082875 |
49 |
34831646 |
Construction of cross drain near Hossainpur Dakshinpara Mandir towards Panchanan via subhen |
216872 |
Construction of cross drain near Hossainpur Dakshinpara Mandir towards Panchanan via subhen1 |
Completion of work |
-
latitude : 23.90803178306669,23.908053198829293
Longitude : 88.25453043915331,88.25458450242877
file name : Image_05032021130944413.png
|
2021-03-05 13:09:44.495888 |
50 |
34866451 |
Constrcution of drain from Nasim house towards Tematha cross drain |
244343 |
Constrcution of drain from Nasim house towards Tematha cross drain1 |
Plinth level |
-
latitude : 23.8990117,23.8990082
Longitude : 88.2497613,88.2497718
file name : Image_06072021111940467.png
|
2021-07-06 11:19:40.578756 |
51 |
34866451 |
Constrcution of drain from Nasim house towards Tematha cross drain |
244343 |
Constrcution of drain from Nasim house towards Tematha cross drain1 |
Plinth level |
-
latitude : 23.8990166,23.8990069
Longitude : 88.2497648,88.2497734
file name : Image_06072021111943529.png
|
2021-07-06 11:19:43.637478 |
52 |
34866451 |
Constrcution of drain from Nasim house towards Tematha cross drain |
244343 |
Constrcution of drain from Nasim house towards Tematha cross drain1 |
Completion of work |
-
latitude : 23.8990038,23.8988977
Longitude : 88.2496523,88.2497037
file name : Image_09032021113725013.png
|
2021-03-09 11:37:25.112442 |
53 |
34814355 |
Construction of drain from Jullu Sk house towards Sahabul house |
202011 |
Construction of drain from Jullu Sk house towards Sahabul house 1 |
Plinth level |
-
latitude : 23.907706481404603,23.907684269361198
Longitude : 88.27505067922175,88.27501815743744
file name : Image_03062021114819701.png
|
2021-06-03 11:48:19.805433 |
54 |
34814355 |
Construction of drain from Jullu Sk house towards Sahabul house |
202011 |
Construction of drain from Jullu Sk house towards Sahabul house 1 |
Completion of work |
-
latitude : 23.906625299714506,23.90657790005207
Longitude : 88.27511144801974,88.2751742284745
file name : Image_09032021113738766.png
|
2021-03-09 11:37:38.879914 |
55 |
39125298 |
Construction of side drain with slab from Kapasdanga Natunpara SSK towards Mudaser house |
336358 |
Construction of side drain with slab from Kapasdanga Natunpara SSK towards Mudaser house 1 |
Completion of work |
-
latitude : 23.906374596990645,23.906403305009007
Longitude : 88.28448903746903,88.28448778018355
file name : Image_09032021113743497.png
|
2021-03-09 11:37:43.607516 |
56 |
34838100 |
Construction of drain from Sharif house towards Sherful land |
201273 |
Construction of drain from Sharif house towards Sherful land1 |
Completion of work |
-
latitude : 23.89858906622976,23.89860817696899
Longitude : 88.24892747215927,88.2489204313606
file name : Image_03062021164307347.png
|
2021-06-03 16:43:07.441806 |
57 |
34872682 |
Construction of side drain from Abdul Matin house towards Main road |
100410 |
Construction of side drain from Abdul Matin house towards Main road1 |
Completion of work |
-
latitude : 23.9125527,23.91259
Longitude : 88.2748397,88.2746891
file name : Image_27032021140253308.png
|
2021-03-27 14:02:53.390505 |
58 |
34872682 |
Construction of side drain from Abdul Matin house towards Main road |
100410 |
Construction of side drain from Abdul Matin house towards Main road1 |
Completion of work |
-
latitude : 23.9122186,23.9125436
Longitude : 88.2744223,88.2748808
file name : Image_09032021113753173.png
|
2021-03-09 11:37:53.278055 |
59 |
34837391 |
Construction drain from Masjid dhar towards Ajim shop at Nababbari Paschim |
199244 |
Construction drain from Masjid dhar towards Ajim shop at Nababbari Paschim1 |
Plinth level |
-
latitude : 23.9058582,23.9058605
Longitude : 88.2514708,88.251469
file name : Image_08062021085258472.png
|
2021-06-08 08:52:58.580225 |
60 |
34837391 |
Construction drain from Masjid dhar towards Ajim shop at Nababbari Paschim |
199244 |
Construction drain from Masjid dhar towards Ajim shop at Nababbari Paschim1 |
Completion of work |
-
latitude : 23.8992907,23.8992881
Longitude : 88.2490899,88.24909
file name : Image_05032021130939817.png
|
2021-03-05 13:09:39.905298 |
61 |
39125731 |
Drain cleaning from Purbapara Primary School towards one No Dumnidhar Sansad No XVIII |
20064 |
Drain cleaning from Purbapara Primary School towards one No Dumnidhar Sansad No XVIII1 |
Completion of work |
-
latitude : 23.91187802888453,23.91187802888453,23.911859672516584,23.911859672516584
Longitude : 88.28573123551905,88.28573123551905,88.28575453720987,88.28575453720987
file name : Image_03072021093922272.png
|
2021-07-03 09:39:22.387053 |
62 |
39125732 |
Drain cleaning from Minarul Sk house towards Mathpara Temata Sansad No XVI |
15056 |
Drain cleaning from Minarul Sk house towards Mathpara Temata Sansad No XVI1 |
Completion of work |
-
latitude : 23.912984733469784,23.913041353225708
Longitude : 88.28265625052154,88.28270419500768
file name : Image_03072021093927947.png
|
2021-07-03 09:39:28.055166 |
63 |
39125734 |
Drain cleaning from Hazrat house towards Nekbox house Sansad No XV |
14943 |
Drain cleaning from Hazrat house towards Nekbox house Sansad No XV1 |
Completion of work |
-
latitude : 23.913408857770264,23.913334887474775
Longitude : 88.28099520877004,88.28111263923347
file name : Image_03072021093934275.png
|
2021-07-03 09:39:34.419492 |
64 |
39125736 |
Drain cleaning from Ashraful Hoque house towards Ichha Military Sansad No XII |
15056 |
Drain cleaning from Ashraful Hoque house towards Ichha Military Sansad No XII1 |
Plinth level |
-
latitude : 23.9135513,23.9135499
Longitude : 88.2774118,88.2774114
file name : Image_24082021131921050.png
|
2021-08-24 13:19:21.139746 |
65 |
39125740 |
Drain cleaning from Majhpara Transformer towards Anarul shop Sansad No XIII |
15056 |
Drain cleaning from Majhpara Transformer towards Anarul shop Sansad No XIII1 |
Completion of work |
-
latitude : 23.912504115141928,23.9125711703673
Longitude : 88.27566700056195,88.27594268135726
file name : Image_06072021111918817.png
|
2021-07-06 11:19:18.954089 |
66 |
39125743 |
Drain cleaning from Majhpara Dablu shop towards Manchhar house via Israil house Sansad No XIV |
16057 |
Drain cleaning from Majhpara Dablu shop towards Manchhar house via Israil house Sansad No XIV1 |
Completion of work |
-
latitude : 23.9125346,23.9125343
Longitude : 88.2748661,88.2748734
file name : Image_06072021111922024.png
|
2021-07-06 11:19:22.155219 |
67 |
39125746 |
Drain cleaning from Minar Masjid towards Bastulla house Sansad No IX |
15056 |
Drain cleaning from Minar Masjid towards Bastulla house Sansad No IX1 |
Completion of work |
-
latitude : 23.9017165,23.9017158
Longitude : 88.2490347,88.2490344
file name : Image_06072021111934414.png
|
2021-07-06 11:19:34.526649 |
68 |
39125748 |
Drain cleaning from Munjur house towards Rahaman house Sansad No X |
15056 |
Drain cleaning from Munjur house towards Rahaman house Sansad No X1 |
Completion of work |
-
latitude : 23.8989818,23.8989818
Longitude : 88.2491428,88.2491428
file name : Image_06072021111937460.png
|
2021-07-06 11:19:37.576461 |
69 |
39125758 |
Drain cleaning from Nababbari Masjid towards Saheb house at Sansad No VII |
25816 |
Drain cleaning from Nababbari Masjid towards Saheb house at Sansad No VII1 |
Completion of work |
-
latitude : 23.906484399922192,23.90648724976927
Longitude : 88.2522379886359,88.25223924592137
file name : Image_06072021111946626.png
|
2021-07-06 11:19:46.699104 |
70 |
39125760 |
Drain Cleaning from Nurchhed house towards Chhamur Shop via majed |
16167 |
Drain Cleaning from Nurchhed house towards Chhamur Shop via majed1 |
Completion of work |
-
latitude : 23.901782613247633,23.901819325983524
Longitude : 88.27463862486184,88.2746252976358
file name : Image_08072021103738951.png
|
2021-07-08 10:37:39.112843 |
71 |
39125762 |
Drain cleaning from Dhananjoy house towards ICDS Centre at Sansad No II |
12083 |
Drain cleaning from Dhananjoy house towards ICDS Centre at Sansad No II1 |
Completion of work |
-
latitude : 23.913721754215658,23.913675444200635
Longitude : 88.26187675818801,88.2618894148618
file name : Image_06072021111925337.png
|
2021-07-06 11:19:25.461074 |
72 |
39125754 |
Drain cleaning from Hossainpur Uttarpara Mandir to Uttam Mondal house |
15056 |
Drain cleaning from Hossainpur Uttarpara Mandir to Uttam Mondal house1 |
Completion of work |
-
latitude : 23.909422969445586,23.90945033635944
Longitude : 88.25520317070186,88.25523694977164
file name : Image_06072021111928597.png
|
2021-07-06 11:19:28.69736 |
73 |
39125757 |
Drain cleaning from Natunpara Masjid towards Machhed house at Sansad No XVII |
16167 |
Drain cleaning from Natunpara Masjid towards Machhed house at Sansad No XVII1 |
Completion of work |
-
latitude : 23.90774130821228,23.907715282402933
Longitude : 88.28505280427635,88.28508222475648
file name : Image_06072021111955689.png
|
2021-07-06 11:19:55.81445 |
74 |
39125765 |
Drain cleaning from Badsha house towards railline at Sansad No VIII |
15056 |
Drain cleaning from Badsha house towards railline at Sansad No VIII1 |
Completion of work |
-
latitude : 23.90658913180232,23.906517173163593
Longitude : 88.25179936364293,88.2517921552062
file name : Image_06072021111931528.png
|
2021-07-06 11:19:31.621678 |
75 |
39125768 |
Drain cleaning from Laxman house towards Sagar house and Masjid |
10046 |
Drain cleaning from Laxman house towards Sagar house and Masjid 1 |
Completion of work |
-
latitude : 23.911821199581027,23.911781636998057
Longitude : 88.25379584915936,88.2537074200809
file name : Image_06072021111949622.png
|
2021-07-06 11:19:49.727845 |
76 |
39125770 |
Drain cleaning from Primary School sankor dhar towards Rafik house at Sansad No XI |
16167 |
Drain cleaning from Primary School sankor dhar towards Rafik house at Sansad No XI1 |
Completion of work |
-
latitude : 23.91204851679504,23.91198791563511
Longitude : 88.27126901596785,88.27125292271376
file name : Image_09072021174657182.png
|
2021-07-09 17:46:57.33005 |
77 |
39125774 |
Drain Cleaning from Atikul house towards Fulchand house at Sansad No III |
15056 |
Drain Cleaning from Atikul house towards Fulchand house at Sansad No III1 |
Completion of work |
-
latitude : 23.912347205914557,23.912353995256126
Longitude : 88.26985842548311,88.26988885179162
file name : Image_09072021174700207.png
|
2021-07-09 17:47:00.32587 |
78 |
34897062 |
Construction of PCC road from main road towards Islam land |
132673 |
Construction of PCC road from main road towards Islam land 1 |
Plinth level |
-
latitude : 23.9079979,23.9079046
Longitude : 88.2852311,88.2852146
file name : Image_04042022144133483.png
|
2022-04-04 14:41:33.593502 |
79 |
34897062 |
Construction of PCC road from main road towards Islam land |
132673 |
Construction of PCC road from main road towards Islam land 1 |
Completion of work |
-
latitude : 23.907719179987907,23.90772399958223
Longitude : 88.28514718450606,88.2851190213114
file name : Image_16122021115900750.png
|
2021-12-16 11:59:00.869135 |
80 |
34863630 |
Construction of PCC road from main road towards Halim house |
79971 |
Construction of PCC road from main road towards Halim house 1 |
Completion of work |
-
latitude : 23.896047296002507,23.896050858311355
Longitude : 88.2497648242861,88.24977102689445
file name : Image_21122021143409617.png
|
2021-12-21 14:34:09.736599 |
81 |
34832584 |
Construction of PCC road from Nripen house towards Joydeb Mondal |
111551 |
Construction of PCC road from Nripen house towards Joydeb Mondal1 |
Completion of work |
-
latitude : 23.912572930566967,23.90805617440492
Longitude : 88.27555753290653,88.25460218824446
file name : Image_31122021093058053.png
|
2021-12-31 09:30:58.182988 |
82 |
34832584 |
Construction of PCC road from Nripen house towards Joydeb Mondal |
111551 |
Construction of PCC road from Nripen house towards Joydeb Mondal1 |
Completion of work |
-
latitude : 23.908058521337807,23.908052486367524
Longitude : 88.25465901754797,88.25464837253094
file name : Image_16122021115920425.png
|
2021-12-16 11:59:20.527564 |
83 |
34874233 |
Construction of PCC road from Sajjad house towards Ajmat house |
57950 |
Construction of PCC road from Sajjad house towards Ajmat house1 |
Completion of work |
-
latitude : 23.91359120607376,23.913614843040705
Longitude : 88.27650602906942,88.27647459693253
file name : Image_31122021093102020.png
|
2021-12-31 09:31:02.138396 |
84 |
34874233 |
Construction of PCC road from Sajjad house towards Ajmat house |
57950 |
Construction of PCC road from Sajjad house towards Ajmat house1 |
Completion of work |
-
latitude : 23.913633325137198,23.91358898486942
Longitude : 88.27658968046308,88.27657517977059
file name : Image_16122021115910292.png
|
2021-12-16 11:59:10.393666 |
85 |
34871653 |
Construction of PCC road from Chhader house towards Lukman house |
84903 |
Construction of PCC road from Chhader house towards Lukman house 1 |
Completion of work |
-
latitude : 23.9125395,23.9126825,23.9127
Longitude : 88.2731178,88.2728166,88.2728448
file name : Image_23122021143548300.png
|
2021-12-23 14:35:48.42808 |
86 |
34871653 |
Construction of PCC road from Chhader house towards Lukman house |
84903 |
Construction of PCC road from Chhader house towards Lukman house 1 |
Completion of work |
-
latitude : 23.9125934,23.9125823
Longitude : 88.2727876,88.2727686
file name : Image_16122021115913294.png
|
2021-12-16 11:59:13.401135 |
87 |
34868453 |
Construction of PCC road from Janmahammad house towards Alam house |
98971 |
Construction of PCC road from Janmahammad house towards Alam house 1 |
Plinth level |
-
latitude : 23.9126802,23.9126902
Longitude : 88.2728669,88.2728746
file name : Image_12042022140701556.png
|
2022-04-12 14:07:01.637683 |
88 |
34868453 |
Construction of PCC road from Janmahammad house towards Alam house |
98971 |
Construction of PCC road from Janmahammad house towards Alam house 1 |
Completion of work |
-
latitude : 23.91326908953488,23.9125643
Longitude : 88.27272319234908,88.2727288
file name : Image_16122021115917400.png
|
2021-12-16 11:59:17.519509 |
89 |
39125772 |
Drain cleaning from Rejaul house towards Nabi house via Mathpara Masjid |
15056 |
Drain cleaning from Rejaul house towards Nabi house via Mathpara Masjid1 |
Plinth level |
-
latitude : 23.91346212476492,23.913478176109493
Longitude : 88.26579337008297,88.26578146778047
file name : Image_24082021150707816.png
|
2021-08-24 15:07:07.905759 |
90 |
39125772 |
Drain cleaning from Rejaul house towards Nabi house via Mathpara Masjid |
15056 |
Drain cleaning from Rejaul house towards Nabi house via Mathpara Masjid1 |
Completion of work |
-
latitude : 23.91343308147043,23.91343815252185
Longitude : 88.26581725850701,88.26581231318414
file name : Image_24082021145623655.png
|
2021-08-24 14:56:23.779016 |
91 |
34899255 |
Construction of PCC road from main road near Safikul tea shop towards Lalchand Biswas new house |
195685 |
Construction of PCC road from main road near Safikul tea shop towards Lalchand Biswas new house1 |
Plinth level |
-
latitude : 23.911968050524592,23.91197840217501
Longitude : 88.2867734413594,88.286756509915
file name : Image_01022022120451247.png
|
2022-02-01 12:04:51.355004 |
92 |
34899255 |
Construction of PCC road from main road near Safikul tea shop towards Lalchand Biswas new house |
195685 |
Construction of PCC road from main road near Safikul tea shop towards Lalchand Biswas new house1 |
Completion of work |
-
latitude : 23.912116619758308,23.912116619758308
Longitude : 88.28678249381483,88.28678249381483
file name : Image_16122021115906988.png
|
2021-12-16 11:59:07.096717 |
93 |
34835588 |
Construction of PCC road from Oliuddin house towards Jamir house at Nababbari Purba |
269687 |
Construction of PCC road from Oliuddin house towards Jamir house at Nababbari Purba1 |
Plinth level |
-
latitude : 23.90528205782175,23.905285452492535
Longitude : 88.25311079621315,88.25310744345188
file name : Image_28012022160630045.png
|
2022-01-28 16:06:30.210001 |
94 |
34835588 |
Construction of PCC road from Oliuddin house towards Jamir house at Nababbari Purba |
269687 |
Construction of PCC road from Oliuddin house towards Jamir house at Nababbari Purba1 |
Completion of work |
-
latitude : 23.905102559365332,23.905217978172004
Longitude : 88.25317659415305,88.25320123694837
file name : Image_28012022131312865.png
|
2022-01-28 13:13:12.985587 |
95 |
34812476 |
Construction of PCC road from Kamal Sk house towards Mahim house via Mursalim house towards Asraf |
219388 |
Construction of PCC road from Kamal Sk house towards Mahim house via Mursalim house towards Asraf 1 |
Plinth level |
-
latitude : 23.9035447826609,23.90350706409663
Longitude : 88.27565912157297,88.275704132393
file name : Image_18022022141915471.png
|
2022-02-18 14:19:15.55986 |
96 |
34812476 |
Construction of PCC road from Kamal Sk house towards Mahim house via Mursalim house towards Asraf |
219388 |
Construction of PCC road from Kamal Sk house towards Mahim house via Mursalim house towards Asraf 1 |
Completion of work |
-
latitude : 23.903493443503976,23.9035327
Longitude : 88.27573413960636,88.2754059
file name : Image_28012022131322983.png
|
2022-01-28 13:13:23.089628 |
97 |
34813640 |
Construction of PCC road With Bamboo Pilling from Chaimaddin house towardsMoni |
174962 |
Construction of PCC road With Bamboo Pilling from Chaimaddin house towardsMoni 1 |
Plinth level |
-
latitude : 23.904373878613114,23.904446717351675
Longitude : 88.27515696175396,88.27519711107016
file name : Image_12042022140704826.png
|
2022-04-12 14:07:04.905373 |
98 |
34813640 |
Construction of PCC road With Bamboo Pilling from Chaimaddin house towardsMoni |
174962 |
Construction of PCC road With Bamboo Pilling from Chaimaddin house towardsMoni 1 |
Completion of work |
-
latitude : 23.90443908981979,23.90451163519174
Longitude : 88.27518847770989,88.27515486627817
file name : Image_28012022131319671.png
|
2022-01-28 13:13:19.783005 |
99 |
34836252 |
Construction of PCC road from main road towards Anech house |
121629 |
Construction of PCC road from main road towards Anech house 1 |
Plinth level |
-
latitude : 23.906373507343233,23.906348906457424
Longitude : 88.25165469199419,88.25165108777583
file name : Image_28012022160633833.png
|
2022-01-28 16:06:34.003 |
100 |
34836252 |
Construction of PCC road from main road towards Anech house |
121629 |
Construction of PCC road from main road towards Anech house 1 |
Completion of work |
-
latitude : 23.90634266193956,23.906294591724873
Longitude : 88.25170330703259,88.25166391208768
file name : Image_28012022131316222.png
|
2022-01-28 13:13:16.333064 |
101 |
34838365 |
Construction of PCC road with Bamboo pilling near Dilar house towards ICDS Centre |
209075 |
Construction of PCC road with Bamboo pilling near Dilar house towards ICDS Centre 1 |
Completion of work |
-
latitude : 23.8989839,23.8989843
Longitude : 88.2491424,88.2491513
file name : Image_21022022161342521.png
|
2022-02-21 16:13:42.612153 |
102 |
34838365 |
Construction of PCC road with Bamboo pilling near Dilar house towards ICDS Centre |
209075 |
Construction of PCC road with Bamboo pilling near Dilar house towards ICDS Centre 1 |
Completion of work |
-
latitude : 23.8989547,23.8989936
Longitude : 88.249093,88.2491307
file name : Image_26032022104753903.png
|
2022-03-26 10:47:54.045698 |
103 |
34879122 |
Construction of PCC road from Laharpara ICDS Centre towards Laharpara Madrasah |
261818 |
Construction of PCC road from Laharpara ICDS Centre towards Laharpara Madrasah 1 |
Plinth level |
-
latitude : 23.909772159531713,23.909772243350744
Longitude : 88.27438021078706,88.27438021078706
file name : Image_04042022144126988.png
|
2022-04-04 14:41:27.131389 |
104 |
34879122 |
Construction of PCC road from Laharpara ICDS Centre towards Laharpara Madrasah |
261818 |
Construction of PCC road from Laharpara ICDS Centre towards Laharpara Madrasah 1 |
Completion of work |
-
latitude : 23.90983795747161,23.909891853109002
Longitude : 88.27431474812329,88.27433494850993
file name : Image_09022022143915008.png
|
2022-02-09 14:39:15.11101 |
105 |
34867170 |
Construction of PCC road from Furkan house towards pond |
111864 |
Construction of PCC road from Furkan house towards pond1 |
Completion of work |
-
latitude : 23.8991588,23.899812824092805
Longitude : 88.2491294,88.2492901571095
file name : Image_04042022144130302.png
|
2022-04-04 14:41:30.424135 |
106 |
34867170 |
Construction of PCC road from Furkan house towards pond |
111864 |
Construction of PCC road from Furkan house towards pond1 |
Completion of work |
-
latitude : 23.8990068,23.8990068
Longitude : 88.249137,88.249137
file name : Image_15032022130751463.png
|
2022-03-15 13:07:51.555367 |
107 |
34804948 |
Sinking of Mark II Tubewell with platform and soakpit near Chhaku |
98966 |
Sinking of Mark II Tubewell with platform and soakpit near Chhaku 1 |
Plinth level |
-
latitude : 23.9134202
Longitude : 88.2662756
file name : Image_28042022122930233.png
|
2022-04-28 12:29:30.401241 |
108 |
39125311 |
Sinking Mark II Tubewell with platform and soakpit near Kamaluddin house at Nababbari Purba |
98966 |
Sinking Mark II Tubewell with platform and soakpit near Kamaluddin house at Nababbari Purba1 |
Plinth level |
-
latitude : 23.9083164
Longitude : 88.2524747
file name : Image_28042022122943955.png
|
2022-04-28 12:29:44.05779 |
109 |
39125311 |
Sinking Mark II Tubewell with platform and soakpit near Kamaluddin house at Nababbari Purba |
98966 |
Sinking Mark II Tubewell with platform and soakpit near Kamaluddin house at Nababbari Purba1 |
Completion of work |
-
latitude : 23.9073709
Longitude : 88.2522454
file name : Image_10032022110156385.png
|
2022-03-10 11:01:56.470967 |
110 |
34787573 |
Sinking of Mark II Tubewell with platform and soakpit near Hadis Sk tea shop at Nowpukuria Ut |
98966 |
Sinking of Mark II Tubewell with platform and soakpit near Hadis Sk tea shop at Nowpukuria Ut1 |
Completion of work |
-
latitude : 23.91359891742468
Longitude : 88.26782405376434
file name : Image_25032022100321932.png
|
2022-03-25 10:03:22.011502 |
111 |
34787573 |
Sinking of Mark II Tubewell with platform and soakpit near Hadis Sk tea shop at Nowpukuria Ut |
98966 |
Sinking of Mark II Tubewell with platform and soakpit near Hadis Sk tea shop at Nowpukuria Ut1 |
Plinth level |
-
latitude : 23.9120636
Longitude : 88.2722849
file name : Image_28042022122926883.png
|
2022-04-28 12:29:26.981745 |
112 |
34815191 |
Sinking of Mark II Tubewell with platform and soakpit near Gafur house |
98966 |
Sinking of Mark II Tubewell with platform and soakpit near Gafur house 1 |
Plinth level |
-
latitude : 23.9121465
Longitude : 88.2739566
file name : Image_28042022122916862.png
|
2022-04-28 12:29:16.970805 |
113 |
34836865 |
sinking of mark ll tubewell with plateform and soakpit beside minarul house |
98966 |
sinking of mark ll tubewell with plateform and soakpit beside minarul house1 |
Plinth level |
-
latitude : 23.905344461090863
Longitude : 88.25128085911274
file name : Image_29042022110748727.png
|
2022-04-29 11:07:48.813446 |
114 |
39125303 |
Sinking Mark II Tubewell with platform and soakpit near Habal Sk house |
98966 |
Sinking Mark II Tubewell with platform and soakpit near Habal Sk house 1 |
Completion of work |
-
latitude : 23.91411821823567
Longitude : 88.27314262278378
file name : Image_15032022130758777.png
|
2022-03-15 13:07:58.881849 |
115 |
39125303 |
Sinking Mark II Tubewell with platform and soakpit near Habal Sk house |
98966 |
Sinking Mark II Tubewell with platform and soakpit near Habal Sk house 1 |
Plinth level |
-
latitude : 23.905049585737288
Longitude : 88.27523667365313
file name : Image_28042022122923486.png
|
2022-04-28 12:29:23.584367 |
116 |
39125306 |
Sinking Mark II Tubewell with platform and soakpit near Nabi house |
98966 |
Sinking Mark II Tubewell with platform and soakpit near Nabi house 1 |
Completion of work |
-
latitude : 23.91139816492796
Longitude : 88.26769455336034
file name : Image_29032022114415547.png
|
2022-03-29 11:44:15.650049 |
117 |
39125306 |
Sinking Mark II Tubewell with platform and soakpit near Nabi house |
98966 |
Sinking Mark II Tubewell with platform and soakpit near Nabi house 1 |
Plinth level |
-
latitude : 23.91140654683113
Longitude : 88.26767468824983
file name : Image_28042022122933630.png
|
2022-04-28 12:29:33.735126 |
118 |
39125319 |
Sinking Mark II Tubewell with platform and soakpit near Majhpara Transformer at Kapasdanga |
98966 |
Sinking Mark II Tubewell with platform and soakpit near Majhpara Transformer at Kapasdanga 1 |
Completion of work |
-
latitude : 23.90862761065364
Longitude : 88.28026531264186
file name : Image_25032022162131174.png
|
2022-03-25 16:21:31.270145 |
119 |
39125319 |
Sinking Mark II Tubewell with platform and soakpit near Majhpara Transformer at Kapasdanga |
98966 |
Sinking Mark II Tubewell with platform and soakpit near Majhpara Transformer at Kapasdanga 1 |
Plinth level |
-
latitude : 23.908576983958483
Longitude : 88.28028827905655
file name : Image_28042022122913516.png
|
2022-04-28 12:29:13.623449 |
120 |
39125321 |
Sinking Mark II Tubewell with platform and soakpit near Laharpara ICDS Centre at Kapasdanga |
98966 |
Sinking Mark II Tubewell with platform and soakpit near Laharpara ICDS Centre at Kapasdanga1 |
Plinth level |
-
latitude : 23.9121465
Longitude : 88.2739566
file name : Image_28042022122920171.png
|
2022-04-28 12:29:20.268206 |
121 |
39125321 |
Sinking Mark II Tubewell with platform and soakpit near Laharpara ICDS Centre at Kapasdanga |
98966 |
Sinking Mark II Tubewell with platform and soakpit near Laharpara ICDS Centre at Kapasdanga1 |
Completion of work |
-
latitude : 23.909728657454252
Longitude : 88.27352902851999
file name : Image_10032022110200641.png
|
2022-03-10 11:02:00.726887 |
122 |
39125322 |
Sinking Mark II Tubewell with platform and soakpit near Jullu Biswas shop |
98966 |
Sinking Mark II Tubewell with platform and soakpit near Jullu Biswas shop 1 |
Plinth level |
-
latitude : 23.9132512
Longitude : 88.2818063
file name : Image_29042022163458595.png
|
2022-04-29 16:34:58.724649 |
123 |
39125322 |
Sinking Mark II Tubewell with platform and soakpit near Jullu Biswas shop |
98966 |
Sinking Mark II Tubewell with platform and soakpit near Jullu Biswas shop 1 |
Completion of work |
-
latitude : 23.9131369
Longitude : 88.2818781
file name : Image_12042022140655105.png
|
2022-04-12 14:06:55.191307 |
124 |
39125317 |
Sinking Mark II Tubewell with platform and soakpit near Kapasdanga GP at Kapasdanga Purbamathpara |
98966 |
Sinking Mark II Tubewell with platform and soakpit near Kapasdanga GP at Kapasdanga Purbamathpara1 |
Completion of work |
-
latitude : 23.91260172240436
Longitude : 88.275685608387
file name : Image_12042022140658335.png
|
2022-04-12 14:06:58.418387 |
125 |
39125315 |
Sinking Mark II Tubewell with platform and soakpit near Samsul house at Natunpara Purba |
98966 |
Sinking Mark II Tubewell with platform and soakpit near Samsul house at Natunpara Purba1 |
Plinth level |
-
latitude : 23.8986601
Longitude : 88.2501411
file name : Image_28042022122937090.png
|
2022-04-28 12:29:37.202087 |
126 |
39125315 |
Sinking Mark II Tubewell with platform and soakpit near Samsul house at Natunpara Purba |
98966 |
Sinking Mark II Tubewell with platform and soakpit near Samsul house at Natunpara Purba1 |
Completion of work |
-
latitude : 23.8990534
Longitude : 88.2497379
file name : Image_10032022110152076.png
|
2022-03-10 11:01:52.166366 |
127 |
39125313 |
Sinking Mark II Tubewell with platform and soakpit near Arman house at Natunpara Paschim |
98966 |
Sinking Mark II Tubewell with platform and soakpit near Arman house at Natunpara Paschim1 |
Plinth level |
-
latitude : 23.9000588
Longitude : 88.2503353
file name : Image_28042022122940488.png
|
2022-04-28 12:29:40.593531 |
128 |
39125313 |
Sinking Mark II Tubewell with platform and soakpit near Arman house at Natunpara Paschim |
98966 |
Sinking Mark II Tubewell with platform and soakpit near Arman house at Natunpara Paschim1 |
Completion of work |
-
latitude : 23.902390636503696
Longitude : 88.25041836127639
file name : Image_04032022170839370.png
|
2022-03-04 17:08:39.470625 |
129 |
34833685 |
Sinking of Mark II Tubewell with platform and soakpit at Hossainpur Malpara |
98966 |
Sinking of Mark II Tubewell with platform and soakpit at Hossainpur Malpara1 |
Plinth level |
-
latitude : 23.907269868068397
Longitude : 88.255983190611
file name : Image_28042022122947226.png
|
2022-04-28 12:29:47.347484 |
130 |
34833685 |
Sinking of Mark II Tubewell with platform and soakpit at Hossainpur Malpara |
98966 |
Sinking of Mark II Tubewell with platform and soakpit at Hossainpur Malpara1 |
Completion of work |
-
latitude : 23.90750862658024
Longitude : 88.2556657679379
file name : Image_26022022155420939.png
|
2022-02-26 15:54:21.049474 |
131 |
34908003 |
Construction of Water Treatement plant at Sansad No XIV |
984626 |
Construction of Water Treatement plant at Sansad No XIV1 |
Completion of work |
-
latitude : 23.9140657
Longitude : 88.2732101
file name : Image_12042022140708049.png
|
2022-04-12 14:07:08.144931 |
132 |
34908003 |
Construction of Water Treatement plant at Sansad No XIV |
984626 |
Construction of Water Treatement plant at Sansad No XIV1 |
Plinth level |
-
latitude : 23.9141143
Longitude : 88.2733212
file name : Image_29042022160855325.png
|
2022-04-29 16:08:55.438289 |
133 |
34908003 |
Construction of Water Treatement plant at Sansad No XIV |
984626 |
Construction of Water Treatement plant at Sansad No XIV1 |
Completion of work |
-
latitude : 23.9140756
Longitude : 88.2731813
file name : Image_15032022130755156.png
|
2022-03-15 13:07:55.288475 |
134 |
46859482 |
Construction of concrete road from main road towards Patai pond at Natunpara Paschim |
264295 |
Construction of concrete road from main road towards Patai pond at Natunpara Paschim1 |
Roof laid |
-
latitude : 23.905312861315906,23.897496652789414
Longitude : 88.25130935758352,88.2482750248164
file name : Image_24092022145756357.png
|
2022-09-24 14:57:56.490949 |
135 |
46859482 |
Construction of concrete road from main road towards Patai pond at Natunpara Paschim |
264295 |
Construction of concrete road from main road towards Patai pond at Natunpara Paschim1 |
Plinth level |
-
latitude : 23.897462873719633,23.897408600896597
Longitude : 88.24832095764577,88.24833353050053
file name : Image_29082022114923182.png
|
2022-08-29 11:49:23.281518 |
136 |
46859482 |
Construction of concrete road from main road towards Patai pond at Natunpara Paschim |
264295 |
Construction of concrete road from main road towards Patai pond at Natunpara Paschim1 |
Completion of work |
-
latitude : 23.8974456069991,23.897492587566376
Longitude : 88.24831768870354,88.24838876724243
file name : Image_12082022131801006.png
|
2022-08-12 13:18:01.099214 |
137 |
39125726 |
PCC road from Gaffar Biswas house towards Giyar house at Kapasdanga Purbapara Uttar |
139839 |
PCC road from Gaffar Biswas house towards Giyar house at Kapasdanga Purbapara Uttar1 |
Plinth level |
-
latitude : 23.913532281294465,23.91345826908946
Longitude : 88.28056680969894,88.28061265870929
file name : Image_29082022114926412.png
|
2022-08-29 11:49:26.514782 |
138 |
39125726 |
PCC road from Gaffar Biswas house towards Giyar house at Kapasdanga Purbapara Uttar |
139839 |
PCC road from Gaffar Biswas house towards Giyar house at Kapasdanga Purbapara Uttar1 |
Completion of work |
-
latitude : 23.9131915,23.913275
Longitude : 88.2813599,88.2814585
file name : Image_04082022114010506.png
|
2022-08-04 11:40:10.612584 |
139 |
34906112 |
Construction of PCC road from Rabiul house towards Aduli house |
239125 |
Construction of PCC road from Rabiul house towards Aduli house1 |
Plinth level |
-
latitude : 23.913426166400313,23.913354291580617
Longitude : 88.28861067071557,88.28857186250389
file name : Image_29082022114918470.png
|
2022-08-29 11:49:18.579893 |
140 |
34906112 |
Construction of PCC road from Rabiul house towards Aduli house |
239125 |
Construction of PCC road from Rabiul house towards Aduli house1 |
Completion of work |
-
latitude : 23.913414725102484,23.91341376118362
Longitude : 88.28856825828552,88.28860614448786
file name : Image_17082022100028334.png
|
2022-08-17 10:00:28.453118 |
141 |
46932563 |
Road repairing near Kapasdanga Masjid towads Kapasdanga MSk at Kapasdanga Purbamathpara |
326190 |
Road repairing near Kapasdanga Masjid towads Kapasdanga MSk at Kapasdanga Purbamathpara1 |
Plinth level |
-
latitude : 23.911260911263525,23.911166028119624
Longitude : 88.2857012283057,88.28559536486864
file name : Image_30102022100213214.png
|
2022-10-30 10:02:13.292342 |
142 |
46932563 |
Road repairing near Kapasdanga Masjid towads Kapasdanga MSk at Kapasdanga Purbamathpara |
326190 |
Road repairing near Kapasdanga Masjid towads Kapasdanga MSk at Kapasdanga Purbamathpara1 |
Completion of work |
-
latitude : 23.911470752209425,23.911462873220444
Longitude : 88.28569888137281,88.28565085306764
file name : Image_14092022115726263.png
|
2022-09-14 11:57:26.399458 |
143 |
47109745 |
Drain cleaning from Hossain Biswas house to Nengru dhar at Kapasdanga Purbamathpara |
50000 |
Drain cleaning from Hossain Biswas house to Nengru dhar at Kapasdanga Purbamathpara1 |
Roof laid |
-
latitude : 23.913054512813687,23.9132834
Longitude : 88.28258508816361,88.2814604
file name : Image_19092022131348997.png
|
2022-09-19 13:13:49.119298 |
144 |
47109745 |
Drain cleaning from Hossain Biswas house to Nengru dhar at Kapasdanga Purbamathpara |
50000 |
Drain cleaning from Hossain Biswas house to Nengru dhar at Kapasdanga Purbamathpara1 |
Plinth level |
-
latitude : 23.9131144,23.913037204183638
Longitude : 88.281918,88.2826218008995
file name : Image_14092022115722982.png
|
2022-09-14 11:57:23.123539 |
145 |
47109745 |
Drain cleaning from Hossain Biswas house to Nengru dhar at Kapasdanga Purbamathpara |
50000 |
Drain cleaning from Hossain Biswas house to Nengru dhar at Kapasdanga Purbamathpara1 |
Completion of work |
-
latitude : 23.913842705078423,23.913120226934552
Longitude : 88.27995518222451,88.28257888555527
file name : Image_12092022133400633.png
|
2022-09-12 13:34:00.752073 |
146 |
47109561 |
Drain cleaning from Majed house towards Maslim Biswas house at Kapasdanga Purbapara Uttar |
50000 |
Drain cleaning from Majed house towards Maslim Biswas house at Kapasdanga Purbapara Uttar1 |
Roof laid |
-
latitude : 23.913751,23.913772758096457
Longitude : 88.2799751,88.28001930378377
file name : Image_19092022131318475.png
|
2022-09-19 13:13:18.595622 |
147 |
47109561 |
Drain cleaning from Majed house towards Maslim Biswas house at Kapasdanga Purbapara Uttar |
50000 |
Drain cleaning from Majed house towards Maslim Biswas house at Kapasdanga Purbapara Uttar1 |
Plinth level |
-
latitude : 23.91378243919462,23.91373143531382
Longitude : 88.27998560853302,88.28001821413636
file name : Image_14092022115716399.png
|
2022-09-14 11:57:16.524477 |
148 |
47109561 |
Drain cleaning from Majed house towards Maslim Biswas house at Kapasdanga Purbapara Uttar |
50000 |
Drain cleaning from Majed house towards Maslim Biswas house at Kapasdanga Purbapara Uttar1 |
Completion of work |
-
latitude : 23.9137532,23.9137518,23.9137518
Longitude : 88.2800438,88.2800455,88.2800455
file name : Image_12092022133357327.png
|
2022-09-12 13:33:57.439796 |
149 |
46958874 |
Construction of high drain from Muktipada Mondal house to Mohan Mondal house at Nowpukuria Dakshin |
270000 |
Construction of high drain from Muktipada Mondal house to Mohan Mondal house at Nowpukuria Dakshin1 |
Roof laid |
-
latitude : 23.9112208,23.9112172,23.9112183
Longitude : 88.2601273,88.2601198,88.2601237
file name : Image_19102022135456075.png
|
2022-10-19 13:54:56.24886 |
150 |
46958874 |
Construction of high drain from Muktipada Mondal house to Mohan Mondal house at Nowpukuria Dakshin |
270000 |
Construction of high drain from Muktipada Mondal house to Mohan Mondal house at Nowpukuria Dakshin1 |
Roof laid |
-
latitude : 23.911463879048824,23.91148173250258,23.911497239023447
Longitude : 88.25951398350298,88.25952471233904,88.25956854969263
file name : Image_13102022143129565.png
|
2022-10-13 14:31:29.679012 |
151 |
46958874 |
Construction of high drain from Muktipada Mondal house to Mohan Mondal house at Nowpukuria Dakshin |
270000 |
Construction of high drain from Muktipada Mondal house to Mohan Mondal house at Nowpukuria Dakshin1 |
Plinth level |
-
latitude : 23.911371426656842,23.91142184380442
Longitude : 88.25956896878779,88.25954717583954
file name : Image_24092022145730088.png
|
2022-09-24 14:57:30.270186 |
152 |
46958874 |
Construction of high drain from Muktipada Mondal house to Mohan Mondal house at Nowpukuria Dakshin |
270000 |
Construction of high drain from Muktipada Mondal house to Mohan Mondal house at Nowpukuria Dakshin1 |
Completion of work |
-
latitude : 23.91146341804415,23.911455245688558
Longitude : 88.25952026993036,88.25952060520649
file name : Image_04082022130511569.png
|
2022-08-04 13:05:11.657706 |
153 |
34885349 |
Construction of PCC road from Main road towards Keramat house |
120800 |
Construction of PCC road from Main road towards Keramat house1 |
Plinth level |
-
latitude : 23.9131023,23.9131228,23.9131138
Longitude : 88.2818794,88.2818752,88.2818797
file name : Image_26082022135315860.png
|
2022-08-26 13:53:15.970871 |
154 |
34885349 |
Construction of PCC road from Main road towards Keramat house |
120800 |
Construction of PCC road from Main road towards Keramat house1 |
Completion of work |
-
latitude : 23.9130735,23.9130779
Longitude : 88.2819469,88.2819445
file name : Image_04082022114013844.png
|
2022-08-04 11:40:13.952898 |
155 |
65115132 |
Operation & maintenance of community sanitary complex |
99000 |
Operation & maintenance of community sanitary complex1 |
Plinth level |
-
latitude : 23.913031169213355,23.9125521434471,23.91255226917565
Longitude : 88.26983478851616,88.26981551013887,88.26981517486274
file name : Image_18112022135606946.png
|
2022-11-18 13:56:07.069846 |
156 |
65115132 |
Operation & maintenance of community sanitary complex |
99000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 23.911630385555327,23.912438568659127
Longitude : 88.27106391079724,88.27001365832984
file name : Image_17112022160542967.png
|
2022-11-17 16:05:43.05658 |
157 |
65115201 |
Operation & maintenance of community sanitary complex |
99000 |
Operation & maintenance of community sanitary complex1 |
Plinth level |
-
latitude : 23.9122059289366,23.912272858433425
Longitude : 88.27605265192688,88.27605340629816
file name : Image_18112022135609829.png
|
2022-11-18 13:56:09.955371 |
158 |
65115201 |
Operation & maintenance of community sanitary complex |
99000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 23.9120395,23.91246241517365
Longitude : 88.2738465,88.2733401004225
file name : Image_17112022160546070.png
|
2022-11-17 16:05:46.160457 |
159 |
65115243 |
Operation & maintenance of community sanitary complex |
99000 |
Operation & maintenance of community sanitary complex1 |
Plinth level |
-
latitude : 23.9117159,23.906243378296494
Longitude : 88.2536825,88.25172300450504
file name : Image_16122022104127422.png
|
2022-12-16 10:41:27.545008 |
160 |
65115243 |
Operation & maintenance of community sanitary complex |
99000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 23.90452751889825,23.90449633821845
Longitude : 88.2507215347141,88.25069739483297
file name : Image_18112022113358000.png
|
2022-11-18 11:33:58.105514 |
161 |
57326037 |
Construction of concrete road from Vuttu house towards Anarul house at Kapasdanga Purbapara Dakshin |
80000 |
Construction of concrete road from Vuttu house towards Anarul house at Kapasdanga Purbapara Dakshin1 |
Roof laid |
-
latitude : 23.91328197,23.91325359
Longitude : 88.28011146,88.2801411
file name : Image_11012024130954544.png
|
2024-01-11 13:09:54.615457 |
162 |
57326037 |
Construction of concrete road from Vuttu house towards Anarul house at Kapasdanga Purbapara Dakshin |
80000 |
Construction of concrete road from Vuttu house towards Anarul house at Kapasdanga Purbapara Dakshin1 |
Plinth level |
-
latitude : 23.91373259,23.91326728
Longitude : 88.28023582,88.28014168
file name : Image_07012024144740623.png
|
2024-01-07 14:47:40.696361 |
163 |
57326037 |
Construction of concrete road from Vuttu house towards Anarul house at Kapasdanga Purbapara Dakshin |
80000 |
Construction of concrete road from Vuttu house towards Anarul house at Kapasdanga Purbapara Dakshin1 |
Completion of work |
-
latitude : 23.91271008,23.91328197
Longitude : 88.27589014,88.28016267
file name : Image_30122023151037997.png
|
2023-12-30 15:10:38.07753 |
164 |
47091550 |
Construction of drain with slab from Basar house towards Fakir house at Kapasdanga Majhpara |
211384 |
Construction of drain with slab from Basar house towards Fakir house at Kapasdanga Majhpara1 |
Roof laid |
-
latitude : 23.9135979,23.913528844714165
Longitude : 88.2773537,88.2772327400744
file name : Image_01032023111709423.png
|
2023-03-01 11:17:09.52802 |
165 |
47091550 |
Construction of drain with slab from Basar house towards Fakir house at Kapasdanga Majhpara |
211384 |
Construction of drain with slab from Basar house towards Fakir house at Kapasdanga Majhpara1 |
Plinth level |
-
latitude : 23.913467447273433,23.913524192757905
Longitude : 88.27733072452247,88.27731513418257
file name : Image_28112022142726136.png
|
2022-11-28 14:27:26.259891 |
166 |
47091550 |
Construction of drain with slab from Basar house towards Fakir house at Kapasdanga Majhpara |
211384 |
Construction of drain with slab from Basar house towards Fakir house at Kapasdanga Majhpara1 |
Plinth level |
-
latitude : 23.907901695929468,23.907932667061687
Longitude : 88.27997596934438,88.28000891022384
file name : Image_29092022152939880.png
|
2022-09-29 15:29:39.991601 |
167 |
47091550 |
Construction of drain with slab from Basar house towards Fakir house at Kapasdanga Majhpara |
211384 |
Construction of drain with slab from Basar house towards Fakir house at Kapasdanga Majhpara1 |
Completion of work |
-
latitude : 23.91343509312719,23.913420382887125
Longitude : 88.2773225940764,88.27734623104334
file name : Image_04082022114020408.png
|
2022-08-04 11:40:20.511593 |
168 |
47038647 |
Construction of drain with slab from Matleb house towards Sahidul house at Nowpukuria Kajipara Daksh |
129613 |
Construction of drain with slab from Matleb house towards Sahidul house at Nowpukuria Kajipara Daksh1 |
Plinth level |
-
latitude : 23.910853257402778,23.910943530499935,23.910878193564713
Longitude : 88.26811708509922,88.26809856109321,88.26807274483144
file name : Image_27032023124150399.png
|
2023-03-27 12:41:50.764053 |
169 |
46929253 |
Construction of concrete road from Kutub house towards Jiyaruddin house at Kapasdanga Purbapara Daks |
90000 |
Construction of concrete road from Kutub house towards Jiyaruddin house at Kapasdanga Purbapara Daks1 |
Completion of work |
-
latitude : 23.913278519175947,23.91328568570316,23.913335516117513
Longitude : 88.27874567359686,88.2790906727314,88.27911481261253
file name : Image_25012023101238405.png
|
2023-01-25 10:12:38.506405 |
170 |
67542174 |
Procurement of Medicine |
140360 |
Procurement of Medicine1 |
Completion of work |
-
latitude : 23.9119668
Longitude : 88.2713134
file name : Image_30122023151052905.png
|
2023-12-30 15:10:53.011772 |
171 |
67542174 |
Procurement of Medicine |
140360 |
Procurement of Medicine1 |
Completion of work |
-
latitude : 23.9118074
Longitude : 88.2710601
file name : Image_29122023113247641.png
|
2023-12-29 11:32:47.702295 |
172 |
67540511 |
Repair of drainage channel |
150000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 23.91249818
Longitude : 88.27476647
file name : Image_30112023121735630.png
|
2023-11-30 12:17:35.712312 |
173 |
67540511 |
Repair of drainage channel |
150000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 23.9125878
Longitude : 88.2748688
file name : Image_26112023170913389.png
|
2023-11-26 17:09:13.451699 |
174 |
67538176 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.91202244
Longitude : 88.28639806
file name : Image_29082024121045963.png
|
2024-08-29 12:10:46.165936 |
175 |
67538176 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.91201007
Longitude : 88.28637973
file name : Image_29082024120251867.png
|
2024-08-29 12:02:51.952791 |
176 |
67538176 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.911744
Longitude : 88.2860914
file name : Image_25122023115239806.png
|
2023-12-25 11:52:38.489755 |
177 |
67538176 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.911744
Longitude : 88.2860914
file name : Image_25122023115218515.png
|
2023-12-25 11:52:18.353837 |
178 |
57324860 |
Construction of concrete road from Eder Ali house towards Arif Biswas new house at Kapasdanga Purbap |
150000 |
Construction of concrete road from Eder Ali house towards Arif Biswas new house at Kapasdanga Purbap1 |
Roof laid |
-
latitude : 23.9132709,23.9132709
Longitude : 88.2816759,88.2816759
file name : Image_11012024130959049.png
|
2024-01-11 13:09:59.11332 |
179 |
57324860 |
Construction of concrete road from Eder Ali house towards Arif Biswas new house at Kapasdanga Purbap |
150000 |
Construction of concrete road from Eder Ali house towards Arif Biswas new house at Kapasdanga Purbap1 |
Plinth level |
-
latitude : 23.9132615,23.913264
Longitude : 88.2817041,88.281697
file name : Image_02012024170836953.png
|
2024-01-02 17:08:37.069733 |
180 |
57324860 |
Construction of concrete road from Eder Ali house towards Arif Biswas new house at Kapasdanga Purbap |
150000 |
Construction of concrete road from Eder Ali house towards Arif Biswas new house at Kapasdanga Purbap1 |
Completion of work |
-
latitude : 23.9132657,23.9132684
Longitude : 88.2816984,88.2817136
file name : Image_30122023151009884.png
|
2023-12-30 15:10:09.956696 |
181 |
57228991 |
Construction of concrete road from Biren Mondal house towards Meghnath Mondal house at Hossainpur |
80000 |
Construction of concrete road from Biren Mondal house towards Meghnath Mondal house at Hossainpur1 |
Plinth level |
-
latitude : 23.90889417,23.90886063
Longitude : 88.25534666,88.25540699
file name : Image_11012024121054260.png
|
2024-01-11 12:10:54.332599 |
182 |
57228991 |
Construction of concrete road from Biren Mondal house towards Meghnath Mondal house at Hossainpur |
80000 |
Construction of concrete road from Biren Mondal house towards Meghnath Mondal house at Hossainpur1 |
Plinth level |
-
latitude : 23.90884557,23.90885187
Longitude : 88.25541943,88.25541384
file name : Image_27122023155840135.png
|
2023-12-27 15:58:40.205036 |
183 |
57228991 |
Construction of concrete road from Biren Mondal house towards Meghnath Mondal house at Hossainpur |
80000 |
Construction of concrete road from Biren Mondal house towards Meghnath Mondal house at Hossainpur1 |
Plinth level |
-
latitude : 23.90884557,23.90885187
Longitude : 88.25541943,88.25541384
file name : Image_27122023155806123.png
|
2023-12-27 15:58:06.18774 |
184 |
57228991 |
Construction of concrete road from Biren Mondal house towards Meghnath Mondal house at Hossainpur |
80000 |
Construction of concrete road from Biren Mondal house towards Meghnath Mondal house at Hossainpur1 |
Completion of work |
-
latitude : 23.90886822,23.90888969
Longitude : 88.25543645,88.2554241
file name : Image_17122023124438112.png
|
2023-12-17 12:44:38.180265 |
185 |
57236920 |
Construction of concrete road from Golam Mostafa house towards Sabir house at Kapasdanga Majhpar |
80000 |
Construction of concrete road from Golam Mostafa house towards Sabir house at Kapasdanga Majhpar1 |
Roof laid |
-
latitude : 23.91361988,23.91360978
Longitude : 88.27607331,88.27606727
file name : Image_11012024130943378.png
|
2024-01-11 13:09:43.450891 |
186 |
57236920 |
Construction of concrete road from Golam Mostafa house towards Sabir house at Kapasdanga Majhpar |
80000 |
Construction of concrete road from Golam Mostafa house towards Sabir house at Kapasdanga Majhpar1 |
Plinth level |
-
latitude : 23.9135855,23.91357943
Longitude : 88.27609799,88.27608937
file name : Image_02012024170828521.png
|
2024-01-02 17:08:28.589208 |
187 |
57236920 |
Construction of concrete road from Golam Mostafa house towards Sabir house at Kapasdanga Majhpar |
80000 |
Construction of concrete road from Golam Mostafa house towards Sabir house at Kapasdanga Majhpar1 |
Completion of work |
-
latitude : 23.9135583,23.9135583
Longitude : 88.2761987,88.2761987
file name : Image_17122023124341321.png
|
2023-12-17 12:43:41.381661 |
188 |
39125776 |
Water Test and Jalobandhu Wages |
30000 |
Water Test and Jalobandhu Wages1 |
Plinth level |
-
latitude : 23.9117028
Longitude : 88.2709979
file name : Image_20022023103644274.png
|
2023-02-20 10:36:44.371482 |
189 |
39125776 |
Water Test and Jalobandhu Wages |
30000 |
Water Test and Jalobandhu Wages1 |
Completion of work |
-
latitude : 23.9119658
Longitude : 88.2709719
file name : Image_20022023094905725.png
|
2023-02-20 09:49:05.840005 |
190 |
39125776 |
Water Test and Jalobandhu Wages |
30000 |
Water Test and Jalobandhu Wages10 |
Plinth level |
-
latitude : 23.909879154525697
Longitude : 88.27450359240174
file name : Image_20022023103647312.png
|
2023-02-20 10:36:47.41065 |
191 |
39125776 |
Water Test and Jalobandhu Wages |
30000 |
Water Test and Jalobandhu Wages10 |
Completion of work |
-
latitude : 23.909854721277952
Longitude : 88.27440208755434
file name : Image_20022023094908702.png
|
2023-02-20 09:49:08.813996 |
192 |
39125776 |
Water Test and Jalobandhu Wages |
30000 |
Water Test and Jalobandhu Wages100 |
Plinth level |
-
latitude : 23.911004215478897
Longitude : 88.27722670510411
file name : Image_20022023103656433.png
|
2023-02-20 10:36:56.530168 |
193 |
39125776 |
Water Test and Jalobandhu Wages |
30000 |
Water Test and Jalobandhu Wages100 |
Completion of work |
-
latitude : 23.911061002872884
Longitude : 88.27711598016322
file name : Image_20022023094918146.png
|
2023-02-20 09:49:18.23902 |
194 |
39125776 |
Water Test and Jalobandhu Wages |
30000 |
Water Test and Jalobandhu Wages11 |
Plinth level |
-
latitude : 23.9088617
Longitude : 88.2751754
file name : Image_20022023103650373.png
|
2023-02-20 10:36:50.469094 |
195 |
39125776 |
Water Test and Jalobandhu Wages |
30000 |
Water Test and Jalobandhu Wages11 |
Completion of work |
-
latitude : 23.9089495
Longitude : 88.2751877
file name : Image_20022023094911856.png
|
2023-02-20 09:49:11.940601 |
196 |
39125776 |
Water Test and Jalobandhu Wages |
30000 |
Water Test and Jalobandhu Wages12 |
Plinth level |
-
latitude : 23.9123494
Longitude : 88.275963
file name : Image_20022023103653333.png
|
2023-02-20 10:36:53.423941 |
197 |
39125776 |
Water Test and Jalobandhu Wages |
30000 |
Water Test and Jalobandhu Wages12 |
Completion of work |
-
latitude : 23.9123519
Longitude : 88.2759691
file name : Image_20022023094914923.png
|
2023-02-20 09:49:15.021608 |
198 |
46928983 |
Construction of concrete road from main road towards Jalil Mondal house at Kapasdanga Purbapara Daks |
150670 |
Construction of concrete road from main road towards Jalil Mondal house at Kapasdanga Purbapara Daks1 |
Roof laid |
-
latitude : 23.913057195022702,23.91302039846778
Longitude : 88.28780986368656,88.28781011514366
file name : Image_23032023113533327.png
|
2023-03-23 11:35:33.445338 |
199 |
46928983 |
Construction of concrete road from main road towards Jalil Mondal house at Kapasdanga Purbapara Daks |
150670 |
Construction of concrete road from main road towards Jalil Mondal house at Kapasdanga Purbapara Daks1 |
Roof laid |
-
latitude : 23.9119046,23.9119046
Longitude : 88.2851491,88.2851491
file name : Image_17032023095804452.png
|
2023-03-17 09:58:04.562273 |
200 |
46928983 |
Construction of concrete road from main road towards Jalil Mondal house at Kapasdanga Purbapara Daks |
150670 |
Construction of concrete road from main road towards Jalil Mondal house at Kapasdanga Purbapara Daks1 |
Plinth level |
-
latitude : 23.9138289,23.9138289,23.9138289
Longitude : 88.2794642,88.2794642,88.2794642
file name : Image_14032023100256005.png
|
2023-03-14 10:02:56.116285 |
201 |
46928983 |
Construction of concrete road from main road towards Jalil Mondal house at Kapasdanga Purbapara Daks |
150670 |
Construction of concrete road from main road towards Jalil Mondal house at Kapasdanga Purbapara Daks1 |
Completion of work |
-
latitude : 23.912050360813737,23.912042272277176
Longitude : 88.28461795113981,88.28464318066835
file name : Image_04082022114023763.png
|
2022-08-04 11:40:23.879039 |
202 |
46852368 |
Construction of concrete road from main road towards Jirafat house via Nutur house at Nowpukuria Utt |
150000 |
Construction of concrete road from main road towards Jirafat house via Nutur house at Nowpukuria Utt1 |
Roof laid |
-
latitude : 23.91437047161162,23.9144724374637
Longitude : 88.2652466185391,88.26519540511072
file name : Image_17032023115610569.png
|
2023-03-17 11:56:10.911829 |
203 |
46852368 |
Construction of concrete road from main road towards Jirafat house via Nutur house at Nowpukuria Utt |
150000 |
Construction of concrete road from main road towards Jirafat house via Nutur house at Nowpukuria Utt1 |
Plinth level |
-
latitude : 23.911654357798398,23.914588233456016
Longitude : 88.27099819667637,88.26522960327566
file name : Image_23012023170949646.png
|
2023-01-23 17:09:49.740032 |
204 |
46852368 |
Construction of concrete road from main road towards Jirafat house via Nutur house at Nowpukuria Utt |
150000 |
Construction of concrete road from main road towards Jirafat house via Nutur house at Nowpukuria Utt1 |
Completion of work |
-
latitude : 23.914484758861363,23.91446921043098
Longitude : 88.26526656746864,88.26525994576514
file name : Image_19012023141617247.png
|
2023-01-19 14:16:17.338574 |
205 |
46852764 |
Improvement of road Nasir house towards Tajumaddin house at Nowpukuria Uttar Kajipara |
126750 |
Improvement of road Nasir house towards Tajumaddin house at Nowpukuria Uttar Kajipara1 |
Roof laid |
-
latitude : 23.912302530370653,23.912255046889186
Longitude : 88.26977636665106,88.26978944242
file name : Image_30102022104553812.png
|
2022-10-30 10:45:53.914181 |
206 |
46852764 |
Improvement of road Nasir house towards Tajumaddin house at Nowpukuria Uttar Kajipara |
126750 |
Improvement of road Nasir house towards Tajumaddin house at Nowpukuria Uttar Kajipara1 |
Plinth level |
-
latitude : 23.91262611374259,23.91262611374259
Longitude : 88.28333702869713,88.28333702869713
file name : Image_26092022150402996.png
|
2022-09-26 15:04:03.088361 |
207 |
46852764 |
Improvement of road Nasir house towards Tajumaddin house at Nowpukuria Uttar Kajipara |
126750 |
Improvement of road Nasir house towards Tajumaddin house at Nowpukuria Uttar Kajipara1 |
Completion of work |
-
latitude : 23.912122193723917,23.91216485761106
Longitude : 88.26974216848612,88.26981953345239
file name : Image_17082022100039960.png
|
2022-08-17 10:00:40.062106 |
208 |
46853278 |
Construction of concrete road from main road towards Mahibul house at Nowpukuria Kajipara Dakshin |
75918 |
Construction of concrete road from main road towards Mahibul house at Nowpukuria Kajipara Dakshin1 |
Roof laid |
-
latitude : 23.913460029289126,23.91343521885574
Longitude : 88.26471126638353,88.26470766216516
file name : Image_17032023115554163.png
|
2023-03-17 11:55:54.478776 |
209 |
46853278 |
Construction of concrete road from main road towards Mahibul house at Nowpukuria Kajipara Dakshin |
75918 |
Construction of concrete road from main road towards Mahibul house at Nowpukuria Kajipara Dakshin1 |
Plinth level |
-
latitude : 23.912257812917233,23.9132021
Longitude : 88.26759740710258,88.2640696
file name : Image_21012023151504102.png
|
2023-01-21 15:15:04.187682 |
210 |
46853278 |
Construction of concrete road from main road towards Mahibul house at Nowpukuria Kajipara Dakshin |
75918 |
Construction of concrete road from main road towards Mahibul house at Nowpukuria Kajipara Dakshin1 |
Completion of work |
-
latitude : 23.913496867753565,23.91349812503904
Longitude : 88.26471881009638,88.26472031883895
file name : Image_19012023113938316.png
|
2023-01-19 11:39:38.415387 |
211 |
46853472 |
Construction of concrete road from main road towards Achheraddin house at Nowpukuria Kajipara Dakshi |
110000 |
Construction of concrete road from main road towards Achheraddin house at Nowpukuria Kajipara Dakshi1 |
Roof laid |
-
latitude : 23.9125555,23.912557
Longitude : 88.2674293,88.2674304
file name : Image_17032023115544404.png
|
2023-03-17 11:55:44.542628 |
212 |
46853472 |
Construction of concrete road from main road towards Achheraddin house at Nowpukuria Kajipara Dakshi |
110000 |
Construction of concrete road from main road towards Achheraddin house at Nowpukuria Kajipara Dakshi1 |
Plinth level |
-
latitude : 23.91168063506484,23.912088708020747
Longitude : 88.27095947228372,88.2678038533777
file name : Image_21012023151501046.png
|
2023-01-21 15:15:01.135554 |
213 |
46853472 |
Construction of concrete road from main road towards Achheraddin house at Nowpukuria Kajipara Dakshi |
110000 |
Construction of concrete road from main road towards Achheraddin house at Nowpukuria Kajipara Dakshi1 |
Completion of work |
-
latitude : 23.9130183,23.9130183
Longitude : 88.2666036,88.2666036
file name : Image_18012023131921195.png
|
2023-01-18 13:19:21.319254 |
214 |
46854113 |
Construction of concrete road from main road towawrds Safikul house at Jitpur Dighirpara |
145558 |
Construction of concrete road from main road towawrds Safikul house at Jitpur Dighirpara1 |
Roof laid |
-
latitude : 23.90319907106459,23.903155317530036
Longitude : 88.27520348131657,88.27520633116364
file name : Image_17032023095817770.png
|
2023-03-17 09:58:17.857873 |
215 |
46854113 |
Construction of concrete road from main road towawrds Safikul house at Jitpur Dighirpara |
145558 |
Construction of concrete road from main road towawrds Safikul house at Jitpur Dighirpara1 |
Completion of work |
-
latitude : 23.9037765,23.9037759
Longitude : 88.2751167,88.2751199
file name : Image_19012023113944994.png
|
2023-01-19 11:39:45.094207 |
216 |
46854528 |
Construction of concrete road from Jahar Sk house towawrds Mijarul house at Jitpur Dighirpara |
91990 |
Construction of concrete road from Jahar Sk house towawrds Mijarul house at Jitpur Dighirpara1 |
Roof laid |
-
latitude : 23.904785765334964,23.90481686219573
Longitude : 88.27625121921301,88.27620612457395
file name : Image_17032023095814553.png
|
2023-03-17 09:58:14.657598 |
217 |
46854528 |
Construction of concrete road from Jahar Sk house towawrds Mijarul house at Jitpur Dighirpara |
91990 |
Construction of concrete road from Jahar Sk house towawrds Mijarul house at Jitpur Dighirpara1 |
Plinth level |
-
latitude : 23.91248873434961,23.9047520281747
Longitude : 88.27567068859935,88.27622867189348
file name : Image_31012023093810864.png
|
2023-01-31 09:38:10.963395 |
218 |
46854528 |
Construction of concrete road from Jahar Sk house towawrds Mijarul house at Jitpur Dighirpara |
91990 |
Construction of concrete road from Jahar Sk house towawrds Mijarul house at Jitpur Dighirpara1 |
Completion of work |
-
latitude : 23.90482222661376,23.90482222661376,23.904846534132957
Longitude : 88.2761565875262,88.2761565875262,88.27615072019398
file name : Image_19012023113948260.png
|
2023-01-19 11:39:48.362347 |
219 |
46855432 |
Construction of concrete road from main road towards Suvendu Mondal house at Hossainpur |
168612 |
Construction of concrete road from main road towards Suvendu Mondal house at Hossainpur1 |
Roof laid |
-
latitude : 23.9116901,23.908029980957508
Longitude : 88.2710358,88.25444125570357
file name : Image_17032023161530487.png
|
2023-03-17 16:15:30.579544 |
220 |
46855432 |
Construction of concrete road from main road towards Suvendu Mondal house at Hossainpur |
168612 |
Construction of concrete road from main road towards Suvendu Mondal house at Hossainpur1 |
Plinth level |
-
latitude : 23.90808106865734,23.90808106865734
Longitude : 88.25454787351191,88.25454787351191
file name : Image_14032023091151942.png
|
2023-03-14 09:11:52.030035 |
221 |
46855432 |
Construction of concrete road from main road towards Suvendu Mondal house at Hossainpur |
168612 |
Construction of concrete road from main road towards Suvendu Mondal house at Hossainpur1 |
Completion of work |
-
latitude : 23.908092635683715,23.90810453798622
Longitude : 88.25457838363945,88.25458358041942
file name : Image_19012023141620500.png
|
2023-01-19 14:16:20.588975 |
222 |
46857575 |
Construction of concrete road from Artej house towards Nekbarul house at Nababbari Purba |
220564 |
Construction of concrete road from Artej house towards Nekbarul house at Nababbari Purba1 |
Roof laid |
-
latitude : 23.91136103309691,23.90678216703236
Longitude : 88.2595320045948,88.25263445265591
file name : Image_19102022135514820.png
|
2022-10-19 13:55:14.950269 |
223 |
46857575 |
Construction of concrete road from Artej house towards Nekbarul house at Nababbari Purba |
220564 |
Construction of concrete road from Artej house towards Nekbarul house at Nababbari Purba1 |
Plinth level |
-
latitude : 23.906608996912837,23.906608996912837
Longitude : 88.25263411737978,88.25263411737978
file name : Image_24092022145744160.png
|
2022-09-24 14:57:44.292675 |
224 |
46857575 |
Construction of concrete road from Artej house towards Nekbarul house at Nababbari Purba |
220564 |
Construction of concrete road from Artej house towards Nekbarul house at Nababbari Purba1 |
Completion of work |
-
latitude : 23.906618719920516,23.906598770990968
Longitude : 88.25262598693371,88.2525490410626
file name : Image_12082022131804377.png
|
2022-08-12 13:18:04.473266 |
225 |
46857835 |
Construction of concrete road from Sherful house towards Mijai house via Hazrat house at Nababbari P |
220000 |
Construction of concrete road from Sherful house towards Mijai house via Hazrat house at Nababbari P1 |
Roof laid |
-
latitude : 23.905304186046124,23.905361015349627
Longitude : 88.25143575668335,88.25141597539186
file name : Image_17032023161540722.png
|
2023-03-17 16:15:40.825586 |
226 |
46857835 |
Construction of concrete road from Sherful house towards Mijai house via Hazrat house at Nababbari P |
220000 |
Construction of concrete road from Sherful house towards Mijai house via Hazrat house at Nababbari P1 |
Plinth level |
-
latitude : 23.905353136360645,23.905338468030095
Longitude : 88.25152586214244,88.25148403644562
file name : Image_23012023170952759.png
|
2023-01-23 17:09:52.850473 |
227 |
46857835 |
Construction of concrete road from Sherful house towards Mijai house via Hazrat house at Nababbari P |
220000 |
Construction of concrete road from Sherful house towards Mijai house via Hazrat house at Nababbari P1 |
Completion of work |
-
latitude : 23.91390577889979,23.90518725849688
Longitude : 88.26041738502681,88.25147054158151
file name : Image_19012023113935099.png
|
2023-01-19 11:39:35.204816 |
228 |
46860412 |
Construction of concrete road from main road towards Rejaul Sk house via Mahiruddin house at Natunpa |
220000 |
Construction of concrete road from main road towards Rejaul Sk house via Mahiruddin house at Natunpa1 |
Roof laid |
-
latitude : 23.898004763759673,23.898031627759337
Longitude : 88.24876754544675,88.24870971031487
file name : Image_17032023161550590.png
|
2023-03-17 16:15:50.688148 |
229 |
46860412 |
Construction of concrete road from main road towards Rejaul Sk house via Mahiruddin house at Natunpa |
220000 |
Construction of concrete road from main road towards Rejaul Sk house via Mahiruddin house at Natunpa1 |
Plinth level |
-
latitude : 23.897948311641812,23.8979308353737
Longitude : 88.24871985241771,88.24874927289784
file name : Image_11022023134209447.png
|
2023-02-11 13:42:09.572665 |
230 |
46860412 |
Construction of concrete road from main road towards Rejaul Sk house via Mahiruddin house at Natunpa |
220000 |
Construction of concrete road from main road towards Rejaul Sk house via Mahiruddin house at Natunpa1 |
Completion of work |
-
latitude : 23.89795866329223,23.897960339672863
Longitude : 88.24874952435493,88.24873577803373
file name : Image_07022023130244163.png
|
2023-02-07 13:02:44.265216 |
231 |
46861076 |
Construction of concrete road from Hachib house towards Kamal house at Kapasdanga Paschimpara |
95000 |
Construction of concrete road from Hachib house towards Kamal house at Kapasdanga Paschimpara1 |
Roof laid |
-
latitude : 23.9118782,23.9119697
Longitude : 88.272429,88.2720628
file name : Image_17032023095823922.png
|
2023-03-17 09:58:24.005884 |
232 |
46861076 |
Construction of concrete road from Hachib house towards Kamal house at Kapasdanga Paschimpara |
95000 |
Construction of concrete road from Hachib house towards Kamal house at Kapasdanga Paschimpara1 |
Plinth level |
-
latitude : 23.9118162,23.9118323
Longitude : 88.2724486,88.2724248
file name : Image_17022023131630810.png
|
2023-02-17 13:16:30.9031 |
233 |
46861076 |
Construction of concrete road from Hachib house towards Kamal house at Kapasdanga Paschimpara |
95000 |
Construction of concrete road from Hachib house towards Kamal house at Kapasdanga Paschimpara1 |
Completion of work |
-
latitude : 23.911797,23.911996968090534
Longitude : 88.2724501,88.27149465680122
file name : Image_19012023113951406.png
|
2023-01-19 11:39:51.507609 |
234 |
46861638 |
Construction of concrete road from Tital house towards Ajabul house at Kapasdanga Paschimpara |
220000 |
Construction of concrete road from Tital house towards Ajabul house at Kapasdanga Paschimpara1 |
Roof laid |
-
latitude : 23.9118021,23.911773
Longitude : 88.2729772,88.2729781
file name : Image_01032023111721597.png
|
2023-03-01 11:17:21.718658 |
235 |
46861638 |
Construction of concrete road from Tital house towards Ajabul house at Kapasdanga Paschimpara |
220000 |
Construction of concrete road from Tital house towards Ajabul house at Kapasdanga Paschimpara1 |
Roof laid |
-
latitude : 23.9118117,23.9118033
Longitude : 88.272921,88.2729015
file name : Image_30102022104608249.png
|
2022-10-30 10:46:08.348397 |
236 |
46861638 |
Construction of concrete road from Tital house towards Ajabul house at Kapasdanga Paschimpara |
220000 |
Construction of concrete road from Tital house towards Ajabul house at Kapasdanga Paschimpara1 |
Completion of work |
-
latitude : 23.910636040382087,23.910636040382087,23.9106862898916
Longitude : 88.27262428589165,88.27262428589165,88.2726392056793
file name : Image_05092022121137124.png
|
2022-09-05 12:11:37.238096 |
237 |
46925490 |
Construction of concrete road near main road towards Kamal house at Natunpara Purba |
150000 |
Construction of concrete road near main road towards Kamal house at Natunpara Purba1 |
Plinth level |
-
latitude : 23.8990825,23.8989908
Longitude : 88.2491186,88.2491104
file name : Image_21012023122105784.png
|
2023-01-21 12:21:05.891062 |
238 |
46925490 |
Construction of concrete road near main road towards Kamal house at Natunpara Purba |
150000 |
Construction of concrete road near main road towards Kamal house at Natunpara Purba1 |
Completion of work |
-
latitude : 23.89908623881638,23.89904365874827
Longitude : 88.24944698251784,88.24946366250515
file name : Image_18012023131915064.png
|
2023-01-18 13:19:15.16959 |
239 |
46925948 |
Construction of concrete road from Akul house towards Masidul house at Kapasdanga |
138157 |
Construction of concrete road from Akul house towards Masidul house at Kapasdanga1 |
Plinth level |
-
latitude : 23.9119723,23.9119436
Longitude : 88.2737502,88.2737085
file name : Image_19092022131402621.png
|
2022-09-19 13:14:02.736676 |
240 |
46925948 |
Construction of concrete road from Akul house towards Masidul house at Kapasdanga |
138157 |
Construction of concrete road from Akul house towards Masidul house at Kapasdanga1 |
Completion of work |
-
latitude : 23.9119388,23.911944,23.911944,23.911944
Longitude : 88.2737145,88.2736976,88.2736976,88.2736976
file name : Image_05092022121834700.png
|
2022-09-05 12:18:34.807277 |
241 |
46926844 |
Construction of concrete road from Jalu house towards Jiyarul house at Kapasdanga |
102741 |
Construction of concrete road from Jalu house towards Jiyarul house at Kapasdanga1 |
Roof laid |
-
latitude : 23.910546898841858,23.9120301
Longitude : 88.2767213601619,88.2738078
file name : Image_23032023113529578.png
|
2023-03-23 11:35:29.668762 |
242 |
46926844 |
Construction of concrete road from Jalu house towards Jiyarul house at Kapasdanga |
102741 |
Construction of concrete road from Jalu house towards Jiyarul house at Kapasdanga1 |
Plinth level |
-
latitude : 23.91057196073234,23.910597315989435
Longitude : 88.27675212174654,88.27678673900664
file name : Image_21012023122112715.png
|
2023-01-21 12:21:12.814777 |
243 |
46926844 |
Construction of concrete road from Jalu house towards Jiyarul house at Kapasdanga |
102741 |
Construction of concrete road from Jalu house towards Jiyarul house at Kapasdanga1 |
Completion of work |
-
latitude : 23.912275624461472,23.910563201643527
Longitude : 88.2673669885844,88.27681263908744
file name : Image_18012023131927710.png
|
2023-01-18 13:19:27.821392 |
244 |
46927296 |
Construction of concrete road from main road towards Ainal housevia Bastulla house at Kapasdanga |
150000 |
Construction of concrete road from main road towards Ainal housevia Bastulla house at Kapasdanga1 |
Roof laid |
-
latitude : 23.9121044,23.9121048,23.9121048
Longitude : 88.2740108,88.274026,88.274026
file name : Image_17032023095811436.png
|
2023-03-17 09:58:11.539176 |
245 |
46927296 |
Construction of concrete road from main road towards Ainal housevia Bastulla house at Kapasdanga |
150000 |
Construction of concrete road from main road towards Ainal housevia Bastulla house at Kapasdanga1 |
Plinth level |
-
latitude : 23.9120195,23.9120178
Longitude : 88.2738332,88.2737929
file name : Image_21012023122059742.png
|
2023-01-21 12:20:59.836022 |
246 |
46927296 |
Construction of concrete road from main road towards Ainal housevia Bastulla house at Kapasdanga |
150000 |
Construction of concrete road from main road towards Ainal housevia Bastulla house at Kapasdanga1 |
Completion of work |
-
latitude : 23.911981,23.911986
Longitude : 88.27376,88.2737447
file name : Image_18012023131924601.png
|
2023-01-18 13:19:24.726503 |
247 |
46930050 |
Construction of concrete road from Main road near Mijai Sk kolghor towards Ali Hossain house at Kapa |
90000 |
Construction of concrete road from Main road near Mijai Sk kolghor towards Ali Hossain house at Kapa1 |
Roof laid |
-
latitude : 23.9137804,23.9137948
Longitude : 88.2779951,88.2780464
file name : Image_17032023095752117.png
|
2023-03-17 09:57:52.214074 |
248 |
46930050 |
Construction of concrete road from Main road near Mijai Sk kolghor towards Ali Hossain house at Kapa |
90000 |
Construction of concrete road from Main road near Mijai Sk kolghor towards Ali Hossain house at Kapa1 |
Plinth level |
-
latitude : 23.913650969043374,23.91379517968744
Longitude : 88.2778162881732,88.27785895206034
file name : Image_24012023181403314.png
|
2023-01-24 18:14:03.407922 |
249 |
46930050 |
Construction of concrete road from Main road near Mijai Sk kolghor towards Ali Hossain house at Kapa |
90000 |
Construction of concrete road from Main road near Mijai Sk kolghor towards Ali Hossain house at Kapa1 |
Completion of work |
-
latitude : 23.91382,23.91382,23.913821
Longitude : 88.2781037,88.2781037,88.2781609
file name : Image_18012023131930837.png
|
2023-01-18 13:19:30.94118 |
250 |
46930303 |
Construction of concrete road from Main road near Rupchand house towards Anarul house at Kapasdanga |
105819 |
Construction of concrete road from Main road near Rupchand house towards Anarul house at Kapasdanga 1 |
Roof laid |
-
latitude : 23.9131966,23.9132447
Longitude : 88.2818709,88.2820957
file name : Image_17032023095758329.png
|
2023-03-17 09:57:58.431103 |
251 |
46930303 |
Construction of concrete road from Main road near Rupchand house towards Anarul house at Kapasdanga |
105819 |
Construction of concrete road from Main road near Rupchand house towards Anarul house at Kapasdanga 1 |
Roof laid |
-
latitude : 23.913164,23.9132426
Longitude : 88.2818897,88.2820641
file name : Image_01032023111715279.png
|
2023-03-01 11:17:15.371699 |
252 |
46930303 |
Construction of concrete road from Main road near Rupchand house towards Anarul house at Kapasdanga |
105819 |
Construction of concrete road from Main road near Rupchand house towards Anarul house at Kapasdanga 1 |
Roof laid |
-
latitude : 23.9131825,23.9131748
Longitude : 88.2820341,88.2820643
file name : Image_15102022112248614.png
|
2022-10-15 11:22:48.749185 |
253 |
46930303 |
Construction of concrete road from Main road near Rupchand house towards Anarul house at Kapasdanga |
105819 |
Construction of concrete road from Main road near Rupchand house towards Anarul house at Kapasdanga 1 |
Plinth level |
-
latitude : 23.9131431,23.9131368
Longitude : 88.2818602,88.2818694
file name : Image_19092022131332832.png
|
2022-09-19 13:13:33.005058 |
254 |
46930303 |
Construction of concrete road from Main road near Rupchand house towards Anarul house at Kapasdanga |
105819 |
Construction of concrete road from Main road near Rupchand house towards Anarul house at Kapasdanga 1 |
Completion of work |
-
latitude : 23.9131576,23.9131524
Longitude : 88.2818474,88.281856
file name : Image_14092022115719664.png
|
2022-09-14 11:57:19.778243 |
255 |
46930599 |
Construction of concrete road from Main road near Sherful house towards Nazrul house at Kapasdanga P |
120770 |
Construction of concrete road from Main road near Sherful house towards Nazrul house at Kapasdanga P1 |
Roof laid |
-
latitude : 23.9133484,23.9133359
Longitude : 88.2813281,88.2813401
file name : Image_17032023095801281.png
|
2023-03-17 09:58:01.3704 |
256 |
46930599 |
Construction of concrete road from Main road near Sherful house towards Nazrul house at Kapasdanga P |
120770 |
Construction of concrete road from Main road near Sherful house towards Nazrul house at Kapasdanga P1 |
Roof laid |
-
latitude : 23.912687972187996,23.91265293583274
Longitude : 88.28345881775022,88.28343886882067
file name : Image_01032023111718516.png
|
2023-03-01 11:17:18.612803 |
257 |
46930599 |
Construction of concrete road from Main road near Sherful house towards Nazrul house at Kapasdanga P |
120770 |
Construction of concrete road from Main road near Sherful house towards Nazrul house at Kapasdanga P1 |
Roof laid |
-
latitude : 23.912640446797013,23.91305497381836
Longitude : 88.28342394903302,88.2825239840895
file name : Image_15102022112301950.png
|
2022-10-15 11:23:02.047887 |
258 |
46930599 |
Construction of concrete road from Main road near Sherful house towards Nazrul house at Kapasdanga P |
120770 |
Construction of concrete road from Main road near Sherful house towards Nazrul house at Kapasdanga P1 |
Plinth level |
-
latitude : 23.870705,23.912665634416044
Longitude : 88.2502251,88.28335898928344
file name : Image_24092022145823121.png
|
2022-09-24 14:58:23.240963 |
259 |
46930599 |
Construction of concrete road from Main road near Sherful house towards Nazrul house at Kapasdanga P |
120770 |
Construction of concrete road from Main road near Sherful house towards Nazrul house at Kapasdanga P1 |
Completion of work |
-
latitude : 23.912601890042424,23.912578504532576
Longitude : 88.28332764096558,88.28340056352317
file name : Image_04082022114030229.png
|
2022-08-04 11:40:30.334732 |
260 |
46930992 |
Construction of concrete road from Lotarypara main road towards Mithun house at Kapasdanga Purba Nat |
220000 |
Construction of concrete road from Lotarypara main road towards Mithun house at Kapasdanga Purba Nat1 |
Roof laid |
-
latitude : 23.90967920422554,23.90967920422554,23.909714366309345
Longitude : 88.28680839389563,88.28680839389563,88.2868270855397
file name : Image_17032023095808434.png
|
2023-03-17 09:58:08.545652 |
261 |
46930992 |
Construction of concrete road from Lotarypara main road towards Mithun house at Kapasdanga Purba Nat |
220000 |
Construction of concrete road from Lotarypara main road towards Mithun house at Kapasdanga Purba Nat1 |
Plinth level |
-
latitude : 23.90953340101987,23.90953340101987
Longitude : 88.28669004142284,88.28669004142284
file name : Image_12032023141540384.png
|
2023-03-12 14:15:40.476296 |
262 |
46930992 |
Construction of concrete road from Lotarypara main road towards Mithun house at Kapasdanga Purba Nat |
220000 |
Construction of concrete road from Lotarypara main road towards Mithun house at Kapasdanga Purba Nat1 |
Completion of work |
-
latitude : 23.9132668,23.9131259
Longitude : 88.2815155,88.2818095
file name : Image_18012023131936778.png
|
2023-01-18 13:19:36.893982 |
263 |
46931625 |
Construction of concrete road from Amzad house towards Matleb Sk house at Kapasdanga Purbamathpara |
330000 |
Construction of concrete road from Amzad house towards Matleb Sk house at Kapasdanga Purbamathpara1 |
Roof laid |
-
latitude : 23.913080915808678,23.91304751392454
Longitude : 88.2866524066776,88.28669481910765
file name : Image_23032023113537967.png
|
2023-03-23 11:35:38.071754 |
264 |
46931625 |
Construction of concrete road from Amzad house towards Matleb Sk house at Kapasdanga Purbamathpara |
330000 |
Construction of concrete road from Amzad house towards Matleb Sk house at Kapasdanga Purbamathpara1 |
Plinth level |
-
latitude : 23.9132592,23.9132592
Longitude : 88.2821078,88.2821078
file name : Image_01022023173835924.png
|
2023-02-01 17:38:36.039586 |
265 |
46931625 |
Construction of concrete road from Amzad house towards Matleb Sk house at Kapasdanga Purbamathpara |
330000 |
Construction of concrete road from Amzad house towards Matleb Sk house at Kapasdanga Purbamathpara1 |
Completion of work |
-
latitude : 23.913033516146243,23.91303749755025
Longitude : 88.28674192540348,88.28672306612134
file name : Image_19012023113941804.png
|
2023-01-19 11:39:41.91083 |
266 |
47033593 |
Construction of drain with slab from main road towards Manijul house at Nowpukuria Dakshin |
105486 |
Construction of drain with slab from main road towards Manijul house at Nowpukuria Dakshin1 |
Completion of work |
-
latitude : 23.912537139840424,23.91252029221505
Longitude : 88.2682576496154,88.26833962462842
file name : Image_18112022113352018.png
|
2022-11-18 11:33:52.132903 |
267 |
47036468 |
Construction of drain with slab from Hamid Sk house towards Fulchand house via Naju house at Nowpuku |
78732 |
Construction of drain with slab from Hamid Sk house towards Fulchand house via Naju house at Nowpuku1 |
Plinth level |
-
latitude : 23.91240483149886,23.912402987480164
Longitude : 88.27001793310046,88.27000611461699
file name : Image_24092022145810177.png
|
2022-09-24 14:58:10.288937 |
268 |
47086734 |
Construction of side drain with slab near Subal Mondal house towards Babu Master house at Hossainpur |
116000 |
Construction of side drain with slab near Subal Mondal house towards Babu Master house at Hossainpur1 |
Roof laid |
-
latitude : 23.91063398681581,23.910612864419818
Longitude : 88.25488407164812,88.25489320792258
file name : Image_17032023161533686.png
|
2023-03-17 16:15:33.868121 |
269 |
47086734 |
Construction of side drain with slab near Subal Mondal house towards Babu Master house at Hossainpur |
116000 |
Construction of side drain with slab near Subal Mondal house towards Babu Master house at Hossainpur1 |
Plinth level |
-
latitude : 23.91045218333602,23.91057774424553
Longitude : 88.25491474941373,88.25493427924812
file name : Image_16122022104124415.png
|
2022-12-16 10:41:24.533575 |
270 |
47086734 |
Construction of side drain with slab near Subal Mondal house towards Babu Master house at Hossainpur |
116000 |
Construction of side drain with slab near Subal Mondal house towards Babu Master house at Hossainpur1 |
Completion of work |
-
latitude : 23.910485501401126,23.910559094510972
Longitude : 88.25491156429052,88.2549336925149
file name : Image_18112022113354943.png
|
2022-11-18 11:33:55.063437 |
271 |
47086927 |
Construction of drain with slab from Kabatulla house towards main road at Nababbari Purba |
200000 |
Construction of drain with slab from Kabatulla house towards main road at Nababbari Purba1 |
Roof laid |
-
latitude : 23.90519878361374,23.905169069767
Longitude : 88.25163046829402,88.2516420353204
file name : Image_17032023161537245.png
|
2023-03-17 16:15:37.323822 |
272 |
47086927 |
Construction of drain with slab from Kabatulla house towards main road at Nababbari Purba |
200000 |
Construction of drain with slab from Kabatulla house towards main road at Nababbari Purba1 |
Completion of work |
-
latitude : 23.905139691196382,23.905153144150972
Longitude : 88.25164790265262,88.25171294622123
file name : Image_19012023141623730.png
|
2023-01-19 14:16:23.825249 |
273 |
47088245 |
Construction of cross drain with slab near Mijai house towards Ariju shop at Nababbari Paschim |
75682 |
Construction of cross drain with slab near Mijai house towards Ariju shop at Nababbari Paschim1 |
Plinth level |
-
latitude : 23.905337126925588,23.905397769995034
Longitude : 88.25128865428269,88.25130457989872
file name : Image_13102022143258851.png
|
2022-10-13 14:32:58.958266 |
274 |
47088245 |
Construction of cross drain with slab near Mijai house towards Ariju shop at Nababbari Paschim |
75682 |
Construction of cross drain with slab near Mijai house towards Ariju shop at Nababbari Paschim1 |
Completion of work |
-
latitude : 23.905306281521916,23.9057869
Longitude : 88.25132377445698,88.2514509
file name : Image_01092022142704627.png
|
2022-09-01 14:27:04.729847 |
275 |
47088478 |
Improvement of drain with slab from Masjid towards Bastulla house at Nababbari Paschim |
250000 |
Improvement of drain with slab from Masjid towards Bastulla house at Nababbari Paschim1 |
Roof laid |
-
latitude : 23.901428813114762,23.90137127134949
Longitude : 88.25005433522165,88.25006045401096
file name : Image_17032023161544050.png
|
2023-03-17 16:15:44.151742 |
276 |
47088478 |
Improvement of drain with slab from Masjid towards Bastulla house at Nababbari Paschim |
250000 |
Improvement of drain with slab from Masjid towards Bastulla house at Nababbari Paschim1 |
Plinth level |
-
latitude : 23.901368589140475,23.901398805901408
Longitude : 88.25000421144068,88.25031459331512
file name : Image_17022023131622531.png
|
2023-02-17 13:16:22.624571 |
277 |
47088478 |
Improvement of drain with slab from Masjid towards Bastulla house at Nababbari Paschim |
250000 |
Improvement of drain with slab from Masjid towards Bastulla house at Nababbari Paschim1 |
Completion of work |
-
latitude : 23.901350400410593,23.901363098993897
Longitude : 88.25000924058259,88.24996766634285
file name : Image_18012023131918131.png
|
2023-01-18 13:19:18.248311 |
278 |
47089078 |
Construction of high drain from Tematha Molla Masjid towards Jaber house at Natunpara Purba |
201830 |
Construction of high drain from Tematha Molla Masjid towards Jaber house at Natunpara Purba1 |
Roof laid |
-
latitude : 23.899179655127227,23.899205597117543
Longitude : 88.25034610927105,88.25040151365101
file name : Image_17032023161547391.png
|
2023-03-17 16:15:47.48597 |
279 |
47089078 |
Construction of high drain from Tematha Molla Masjid towards Jaber house at Natunpara Purba |
201830 |
Construction of high drain from Tematha Molla Masjid towards Jaber house at Natunpara Purba1 |
Completion of work |
-
latitude : 23.898985236883163,23.8989553
Longitude : 88.25029162690043,88.2499485
file name : Image_01092022142708109.png
|
2022-09-01 14:27:08.246814 |
280 |
47091774 |
Construction of side drain from Sajjad house towards Sastitala main road at Kapasdanga Purbapara Utt |
180000 |
Construction of side drain from Sajjad house towards Sastitala main road at Kapasdanga Purbapara Utt1 |
Roof laid |
-
latitude : 23.9136019,23.9136022
Longitude : 88.2773588,88.277359
file name : Image_17032023095748917.png
|
2023-03-17 09:57:49.023876 |
281 |
47091774 |
Construction of side drain from Sajjad house towards Sastitala main road at Kapasdanga Purbapara Utt |
180000 |
Construction of side drain from Sajjad house towards Sastitala main road at Kapasdanga Purbapara Utt1 |
Plinth level |
-
latitude : 23.913461286574602,23.91310224775225
Longitude : 88.27732058241963,88.27764923684299
file name : Image_28022023114443163.png
|
2023-02-28 11:44:43.252227 |
282 |
47091774 |
Construction of side drain from Sajjad house towards Sastitala main road at Kapasdanga Purbapara Utt |
180000 |
Construction of side drain from Sajjad house towards Sastitala main road at Kapasdanga Purbapara Utt1 |
Completion of work |
-
latitude : 23.9136003,23.9136031
Longitude : 88.2773705,88.2773784
file name : Image_08022023114028998.png
|
2023-02-08 11:40:29.110615 |
283 |
47091985 |
Construction of high drain from Lutfar Rahaman house towards Sentu Shop at Kapasdanga Majhpara Uttar |
294804 |
Construction of high drain from Lutfar Rahaman house towards Sentu Shop at Kapasdanga Majhpara Uttar1 |
Roof laid |
-
latitude : 23.90784675255418,23.90784675255418,23.907792731188238
Longitude : 88.2799992710352,88.2799992710352,88.28003246337175
file name : Image_19102022135537942.png
|
2022-10-19 13:55:38.065741 |
284 |
47091985 |
Construction of high drain from Lutfar Rahaman house towards Sentu Shop at Kapasdanga Majhpara Uttar |
294804 |
Construction of high drain from Lutfar Rahaman house towards Sentu Shop at Kapasdanga Majhpara Uttar1 |
Plinth level |
-
latitude : 23.90775304287672,23.90775304287672
Longitude : 88.28001419082284,88.28001419082284
file name : Image_26082022135319224.png
|
2022-08-26 13:53:19.333331 |
285 |
47091985 |
Construction of high drain from Lutfar Rahaman house towards Sentu Shop at Kapasdanga Majhpara Uttar |
294804 |
Construction of high drain from Lutfar Rahaman house towards Sentu Shop at Kapasdanga Majhpara Uttar1 |
Completion of work |
-
latitude : 23.90766918193549,23.90766733791679
Longitude : 88.2800561003387,88.28010991215706
file name : Image_17082022100008596.png
|
2022-08-17 10:00:08.728909 |
286 |
47092520 |
Construction of drain with slab from Byzed Ahmed house towards Rafikul house at Kapasdanga Purbapara |
125000 |
Construction of drain with slab from Byzed Ahmed house towards Rafikul house at Kapasdanga Purbapara1 |
Roof laid |
-
latitude : 23.940794337540865,23.913287613540888
Longitude : 88.23993436060846,88.27779550105333
file name : Image_17032023095755074.png
|
2023-03-17 09:57:55.163088 |
287 |
47092520 |
Construction of drain with slab from Byzed Ahmed house towards Rafikul house at Kapasdanga Purbapara |
125000 |
Construction of drain with slab from Byzed Ahmed house towards Rafikul house at Kapasdanga Purbapara1 |
Roof laid |
-
latitude : 23.91351857688278,23.913259534165263
Longitude : 88.2772515155375,88.2778405956924
file name : Image_01032023111712327.png
|
2023-03-01 11:17:12.42812 |
288 |
47092520 |
Construction of drain with slab from Byzed Ahmed house towards Rafikul house at Kapasdanga Purbapara |
125000 |
Construction of drain with slab from Byzed Ahmed house towards Rafikul house at Kapasdanga Purbapara1 |
Plinth level |
-
latitude : 23.91313824802637,23.91275561414659
Longitude : 88.27798602171242,88.27772760763764
file name : Image_29012023141510150.png
|
2023-01-29 14:15:10.250951 |
289 |
47092520 |
Construction of drain with slab from Byzed Ahmed house towards Rafikul house at Kapasdanga Purbapara |
125000 |
Construction of drain with slab from Byzed Ahmed house towards Rafikul house at Kapasdanga Purbapara1 |
Plinth level |
-
latitude : 23.913299599662423,23.913299599662423
Longitude : 88.27786398120224,88.27786398120224
file name : Image_24012023181406406.png
|
2023-01-24 18:14:06.524074 |
290 |
47092520 |
Construction of drain with slab from Byzed Ahmed house towards Rafikul house at Kapasdanga Purbapara |
125000 |
Construction of drain with slab from Byzed Ahmed house towards Rafikul house at Kapasdanga Purbapara1 |
Completion of work |
-
latitude : 23.91335022635758,23.913318375125527
Longitude : 88.27785333618522,88.27788912691176
file name : Image_18012023131933738.png
|
2023-01-18 13:19:33.841639 |
291 |
47092968 |
Construction of drain with slab from Hossain house towards Nabi Mondal house at Kapasdanga Purbapara |
241481 |
Construction of drain with slab from Hossain house towards Nabi Mondal house at Kapasdanga Purbapara1 |
Roof laid |
-
latitude : 23.911976,23.911976
Longitude : 88.2851495,88.2851495
file name : Image_23032023113541542.png
|
2023-03-23 11:35:41.666307 |
292 |
47092968 |
Construction of drain with slab from Hossain house towards Nabi Mondal house at Kapasdanga Purbapara |
241481 |
Construction of drain with slab from Hossain house towards Nabi Mondal house at Kapasdanga Purbapara1 |
Plinth level |
-
latitude : 23.91226372215897,23.9130743
Longitude : 88.28357239253819,88.2819917
file name : Image_12032023141537008.png
|
2023-03-12 14:15:37.099543 |
293 |
47093169 |
Construction of high drain from Old Edghatala Babu tea shop to Ziaul kolghor at Kapasdanga Purba Na |
326960 |
Construction of high drain from Old Edghatala Babu tea shop to Ziaul kolghor at Kapasdanga Purba Na1 |
Roof laid |
-
latitude : 23.90855586156249,23.90955272130668
Longitude : 88.28548648394644,88.2856301497668
file name : Image_30102022100240531.png
|
2022-10-30 10:02:40.608667 |
294 |
47093169 |
Construction of high drain from Old Edghatala Babu tea shop to Ziaul kolghor at Kapasdanga Purba Na |
326960 |
Construction of high drain from Old Edghatala Babu tea shop to Ziaul kolghor at Kapasdanga Purba Na1 |
Plinth level |
-
latitude : 23.908626730553806,23.908605063334107
Longitude : 88.2854163274169,88.28542311675847
file name : Image_29092022153010833.png
|
2022-09-29 15:30:10.944432 |
295 |
47093169 |
Construction of high drain from Old Edghatala Babu tea shop to Ziaul kolghor at Kapasdanga Purba Na |
326960 |
Construction of high drain from Old Edghatala Babu tea shop to Ziaul kolghor at Kapasdanga Purba Na1 |
Plinth level |
-
latitude : 23.91302484087646,23.913070647977293
Longitude : 88.28781388700008,88.28778186812997
file name : Image_29082022114915112.png
|
2022-08-29 11:49:15.215113 |
296 |
47104165 |
Construction of drain with slab from Negro Mannan house towards Ziaul house with cross drain at Kap |
253462 |
Construction of drain with slab from Negro Mannan house towards Ziaul house with cross drain at Kap1 |
Roof laid |
-
latitude : 23.913055351004004,23.913068803958595
Longitude : 88.28771464526653,88.28769913874567
file name : Image_19102022135612901.png
|
2022-10-19 13:56:13.025776 |
297 |
47104165 |
Construction of drain with slab from Negro Mannan house towards Ziaul house with cross drain at Kap |
253462 |
Construction of drain with slab from Negro Mannan house towards Ziaul house with cross drain at Kap1 |
Roof laid |
-
latitude : 23.913041478954256,23.913044999353588
Longitude : 88.28767625615001,88.28761674463749
file name : Image_29092022153152023.png
|
2022-09-29 15:31:52.136447 |
298 |
47104165 |
Construction of drain with slab from Negro Mannan house towards Ziaul house with cross drain at Kap |
253462 |
Construction of drain with slab from Negro Mannan house towards Ziaul house with cross drain at Kap1 |
Completion of work |
-
latitude : 23.91299986280501,23.912959001027048
Longitude : 88.28772076405585,88.28775060363114
file name : Image_04082022114026998.png
|
2022-08-04 11:40:27.120904 |
299 |
47200895 |
Construction of concrete road from Nurfan house towards Marjul house at Kapasdanga Paschimpara |
120000 |
Construction of concrete road from Nurfan house towards Marjul house at Kapasdanga Paschimpara1 |
Roof laid |
-
latitude : 23.9126912,23.9126843
Longitude : 88.2730666,88.2730302
file name : Image_17032023095820756.png
|
2023-03-17 09:58:20.865065 |
300 |
47200895 |
Construction of concrete road from Nurfan house towards Marjul house at Kapasdanga Paschimpara |
120000 |
Construction of concrete road from Nurfan house towards Marjul house at Kapasdanga Paschimpara1 |
Plinth level |
-
latitude : 23.9126711,23.9126632
Longitude : 88.2730378,88.2730297
file name : Image_31012023093803770.png
|
2023-01-31 09:38:03.87344 |
301 |
47200895 |
Construction of concrete road from Nurfan house towards Marjul house at Kapasdanga Paschimpara |
120000 |
Construction of concrete road from Nurfan house towards Marjul house at Kapasdanga Paschimpara1 |
Completion of work |
-
latitude : 23.9126456,23.9126456,23.9126491
Longitude : 88.2730729,88.2730729,88.2730787
file name : Image_19012023113922391.png
|
2023-01-19 11:39:22.495735 |
302 |
47736187 |
Construction of drain with slab from Habibur house towards Atal Faraji house at Nababbari |
179380 |
Construction of drain with slab from Habibur house towards Atal Faraji house at Nababbari1 |
Roof laid |
-
latitude : 23.904894394800067,23.90488747972995
Longitude : 88.25174940750003,88.25176105834544
file name : Image_13102022143538559.png
|
2022-10-13 14:35:38.668385 |
303 |
47736187 |
Construction of drain with slab from Habibur house towards Atal Faraji house at Nababbari |
179380 |
Construction of drain with slab from Habibur house towards Atal Faraji house at Nababbari1 |
Plinth level |
-
latitude : 23.904877547174692,23.90481078531593
Longitude : 88.25164874084294,88.25183473527431
file name : Image_01092022142701317.png
|
2022-09-01 14:27:01.429605 |
304 |
47736187 |
Construction of drain with slab from Habibur house towards Atal Faraji house at Nababbari |
179380 |
Construction of drain with slab from Habibur house towards Atal Faraji house at Nababbari1 |
Completion of work |
-
latitude : 23.90486623160541,23.904868410900235
Longitude : 88.25181948021054,88.25178863480687
file name : Image_12082022131807703.png
|
2022-08-12 13:18:07.799348 |
305 |
47736528 |
Construction of drain with slab from Lotary Nazim house towards Takkel house at Kapasdanga Purbamath |
107513 |
Construction of drain with slab from Lotary Nazim house towards Takkel house at Kapasdanga Purbamath1 |
Roof laid |
-
latitude : 23.90981641598046,23.909874251112342
Longitude : 88.28650077804923,88.28637387603521
file name : Image_30102022100226571.png
|
2022-10-30 10:02:26.651746 |
306 |
47736528 |
Construction of drain with slab from Lotary Nazim house towards Takkel house at Kapasdanga Purbamath |
107513 |
Construction of drain with slab from Lotary Nazim house towards Takkel house at Kapasdanga Purbamath1 |
Plinth level |
-
latitude : 23.909927727654576,23.90993992332369
Longitude : 88.28632299788296,88.2862882129848
file name : Image_29092022153046235.png
|
2022-09-29 15:30:46.327738 |
307 |
47736528 |
Construction of drain with slab from Lotary Nazim house towards Takkel house at Kapasdanga Purbamath |
107513 |
Construction of drain with slab from Lotary Nazim house towards Takkel house at Kapasdanga Purbamath1 |
Completion of work |
-
latitude : 23.90982944983989,23.90982944983989
Longitude : 88.28643363900483,88.28643363900483
file name : Image_04082022114017205.png
|
2022-08-04 11:40:17.319259 |
308 |
57225031 |
Construction of concrete road from main road towards Kalu house at Nowpukuria Kajipara Dakshin |
120000 |
Construction of concrete road from main road towards Kalu house at Nowpukuria Kajipara Dakshin1 |
Roof laid |
-
latitude : 23.91306868,23.91305015
Longitude : 88.26702429,88.2670135
file name : Image_11012024120939377.png
|
2024-01-11 12:09:39.449961 |
309 |
57225031 |
Construction of concrete road from main road towards Kalu house at Nowpukuria Kajipara Dakshin |
120000 |
Construction of concrete road from main road towards Kalu house at Nowpukuria Kajipara Dakshin1 |
Plinth level |
-
latitude : 23.91187736,23.91187736
Longitude : 88.27196576,88.27196576
file name : Image_11012024092943946.png
|
2024-01-11 09:29:44.012109 |
310 |
57225031 |
Construction of concrete road from main road towards Kalu house at Nowpukuria Kajipara Dakshin |
120000 |
Construction of concrete road from main road towards Kalu house at Nowpukuria Kajipara Dakshin1 |
Completion of work |
-
latitude : 23.9134614,23.91306357
Longitude : 88.2662794,88.26705283
file name : Image_30122023150911710.png
|
2023-12-30 15:09:11.781933 |
311 |
67538746 |
Drainage Construction |
348000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.9127178
Longitude : 88.2735435
file name : Image_25072024152456217.png
|
2024-07-25 15:24:56.287306 |
312 |
67538746 |
Drainage Construction |
348000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.9119393
Longitude : 88.271079
file name : Image_21022024120707956.png
|
2024-02-21 12:07:08.033565 |
313 |
67538746 |
Drainage Construction |
348000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.9126969
Longitude : 88.2735218
file name : Image_04022024085117446.png
|
2024-02-04 08:51:17.514938 |
314 |
67538746 |
Drainage Construction |
348000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.9127699
Longitude : 88.2735346
file name : Image_30122023150948079.png
|
2023-12-30 15:09:48.158771 |
315 |
57397032 |
Construction of drain with slab from Selim master house towards main road at Kapasdanga Majhpara Utt |
168000 |
Construction of drain with slab from Selim master house towards main road at Kapasdanga Majhpara Utt1 |
Completion of work |
-
latitude : 23.91308239,23.9130789
Longitude : 88.2774634,88.27746434
file name : Image_12042023111914718.png
|
2023-04-12 11:19:14.779131 |
316 |
57690775 |
Cost of Water testing at kapasdanga GP |
50000 |
Cost of Water testing at kapasdanga GP1 |
Plinth level |
-
latitude : 23.914230368100107
Longitude : 88.2669090013951
file name : Image_23032023122935270.png
|
2023-03-23 12:29:35.38308 |
317 |
57690775 |
Cost of Water testing at kapasdanga GP |
50000 |
Cost of Water testing at kapasdanga GP1 |
Completion of work |
-
latitude : 23.9142884965986
Longitude : 88.26692727394402
file name : Image_23032023115716851.png
|
2023-03-23 11:57:16.947662 |
318 |
57690775 |
Cost of Water testing at kapasdanga GP |
50000 |
Cost of Water testing at kapasdanga GP10 |
Plinth level |
-
latitude : 23.913565599359572
Longitude : 88.26772254891694
file name : Image_23032023122938526.png
|
2023-03-23 12:29:38.629143 |
319 |
57690775 |
Cost of Water testing at kapasdanga GP |
50000 |
Cost of Water testing at kapasdanga GP10 |
Completion of work |
-
latitude : 23.91356115695089
Longitude : 88.26766831800342
file name : Image_23032023115720052.png
|
2023-03-23 11:57:20.151388 |
320 |
57690775 |
Cost of Water testing at kapasdanga GP |
50000 |
Cost of Water testing at kapasdanga GP1 |
Plinth level |
-
latitude : 23.9110649
Longitude : 88.2674588
file name : Image_23032023122944791.png
|
2023-03-23 12:29:44.891908 |
321 |
57690775 |
Cost of Water testing at kapasdanga GP |
50000 |
Cost of Water testing at kapasdanga GP1 |
Completion of work |
-
latitude : 23.9110628
Longitude : 88.2674529
file name : Image_23032023115726971.png
|
2023-03-23 11:57:27.07826 |
322 |
57690775 |
Cost of Water testing at kapasdanga GP |
50000 |
Cost of Water testing at kapasdanga GP2 |
Plinth level |
-
latitude : 23.91134758014232
Longitude : 88.26766756363213
file name : Image_23032023122947866.png
|
2023-03-23 12:29:47.976684 |
323 |
57690775 |
Cost of Water testing at kapasdanga GP |
50000 |
Cost of Water testing at kapasdanga GP2 |
Completion of work |
-
latitude : 23.911397787742317
Longitude : 88.2676711678505
file name : Image_23032023115730120.png
|
2023-03-23 11:57:30.228334 |
324 |
57690775 |
Cost of Water testing at kapasdanga GP |
50000 |
Cost of Water testing at kapasdanga GP10 |
Plinth level |
-
latitude : 23.9141978463158
Longitude : 88.2681527081877
file name : Image_23032023122941661.png
|
2023-03-23 12:29:41.759312 |
325 |
57690775 |
Cost of Water testing at kapasdanga GP |
50000 |
Cost of Water testing at kapasdanga GP10 |
Completion of work |
-
latitude : 23.9142530830577
Longitude : 88.26808657497168
file name : Image_23032023115723809.png
|
2023-03-23 11:57:23.915704 |
326 |
57677027 |
Construction of said drain from Sahabul house towards main road at Kapasdanga |
140000 |
Construction of said drain from Sahabul house towards main road at Kapasdanga 1 |
Completion of work |
-
latitude : 23.90987589,23.90987996
Longitude : 88.27565287,88.2756375
file name : Image_12042023111859675.png
|
2023-04-12 11:18:59.731411 |
327 |
67539094 |
Drainage Construction |
350000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.91381157
Longitude : 88.27883521
file name : Image_22082024113122814.png
|
2024-08-22 11:31:22.886786 |
328 |
67539094 |
Drainage Construction |
350000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.9119601
Longitude : 88.2851257
file name : Image_14032024091109413.png
|
2024-03-14 09:11:09.487861 |
329 |
67539094 |
Drainage Construction |
350000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.9119161
Longitude : 88.2856008
file name : Image_30122023151017029.png
|
2023-12-30 15:10:17.103965 |
330 |
57389837 |
Construction of high drain from Hafijul Rahaman towards Afan house at Natunpara Purba |
240000 |
Construction of high drain from Hafijul Rahaman towards Afan house at Natunpara Purba1 |
Plinth level |
-
latitude : 23.8990296,23.8990296
Longitude : 88.2491135,88.2491135
file name : Image_06052023123544189.png
|
2023-05-06 12:35:44.281037 |
331 |
57389837 |
Construction of high drain from Hafijul Rahaman towards Afan house at Natunpara Purba |
240000 |
Construction of high drain from Hafijul Rahaman towards Afan house at Natunpara Purba1 |
Completion of work |
-
latitude : 23.8987105,23.8986522
Longitude : 88.2500473,88.2500065
file name : Image_12042023111835409.png
|
2023-04-12 11:18:35.471157 |
332 |
57367143 |
Construction of drain with slab from main road towards Sahajaddin house at Nowpukuria Kajipara Dak |
130000 |
Construction of drain with slab from main road towards Sahajaddin house at Nowpukuria Kajipara Dak1 |
Roof laid |
-
latitude : 23.9134604,23.9134577,23.9134577
Longitude : 88.2662862,88.2662807,88.2662807
file name : Image_09062023133836552.png
|
2023-06-09 13:38:36.6062 |
333 |
57367143 |
Construction of drain with slab from main road towards Sahajaddin house at Nowpukuria Kajipara Dak |
130000 |
Construction of drain with slab from main road towards Sahajaddin house at Nowpukuria Kajipara Dak1 |
Plinth level |
-
latitude : 23.9117127,23.9117127
Longitude : 88.2710355,88.2710355
file name : Image_05052023144454568.png
|
2023-05-05 14:44:54.619839 |
334 |
57367143 |
Construction of drain with slab from main road towards Sahajaddin house at Nowpukuria Kajipara Dak |
130000 |
Construction of drain with slab from main road towards Sahajaddin house at Nowpukuria Kajipara Dak1 |
Plinth level |
-
latitude : 23.9134498,23.9134533
Longitude : 88.2662749,88.2662776
file name : Image_30042023154258381.png
|
2023-04-30 15:42:58.437786 |
335 |
57367143 |
Construction of drain with slab from main road towards Sahajaddin house at Nowpukuria Kajipara Dak |
130000 |
Construction of drain with slab from main road towards Sahajaddin house at Nowpukuria Kajipara Dak1 |
Completion of work |
-
latitude : 23.9134604,23.9134605
Longitude : 88.2662813,88.2662811
file name : Image_12042023111844260.png
|
2023-04-12 11:18:44.346673 |
336 |
57400156 |
Construction of high drain from Anarul tee shop towards Akher house at Kapasdanga Majhpara Uttar |
200000 |
Construction of high drain from Anarul tee shop towards Akher house at Kapasdanga Majhpara Uttar1 |
Roof laid |
-
latitude : 23.9117237,23.9117237,23.9117237
Longitude : 88.2710273,88.2710273,88.2710273
file name : Image_26052023155529682.png
|
2023-05-26 15:55:29.755914 |
337 |
57400156 |
Construction of high drain from Anarul tee shop towards Akher house at Kapasdanga Majhpara Uttar |
200000 |
Construction of high drain from Anarul tee shop towards Akher house at Kapasdanga Majhpara Uttar1 |
Plinth level |
-
latitude : 23.91091738,23.91089925
Longitude : 88.2772702,88.27725009
file name : Image_17042023105801810.png
|
2023-04-17 10:58:01.875728 |
338 |
57400156 |
Construction of high drain from Anarul tee shop towards Akher house at Kapasdanga Majhpara Uttar |
200000 |
Construction of high drain from Anarul tee shop towards Akher house at Kapasdanga Majhpara Uttar1 |
Completion of work |
-
latitude : 23.91098076,23.91080817
Longitude : 88.27725707,88.27728497
file name : Image_12042023111902812.png
|
2023-04-12 11:19:02.869392 |
339 |
47091355 |
Construction of drain with slab from main road near Jabbar house towards Yeachhaddin house at Kapasd |
300000 |
Construction of drain with slab from main road near Jabbar house towards Yeachhaddin house at Kapasd1 |
Completion of work |
-
latitude : 23.911833,23.9118248
Longitude : 88.2727295,88.2727774
file name : Image_29032023150915944.png
|
2023-03-29 15:09:16.058729 |
340 |
47092781 |
Construction of drain with slab from main road Hannan house towards Abdus Shukur house at Kapasdanga |
150000 |
Construction of drain with slab from main road Hannan house towards Abdus Shukur house at Kapasdanga1 |
Completion of work |
-
latitude : 23.9125875,23.90808106865734,23.9126231
Longitude : 88.2789891,88.25454787351191,88.2789771
file name : Image_14032023091155021.png
|
2023-03-14 09:11:55.115706 |
341 |
57326909 |
Construction of concrete road from Khadimul Land towards Akib house at Kapasdanga Purba Natunpara |
150000 |
Construction of concrete road from Khadimul Land towards Akib house at Kapasdanga Purba Natunpara1 |
Plinth level |
-
latitude : 23.90770667,23.90770251
Longitude : 88.28520977,88.2851816
file name : Image_01062023114041629.png
|
2023-06-01 11:40:41.737693 |
342 |
57326909 |
Construction of concrete road from Khadimul Land towards Akib house at Kapasdanga Purba Natunpara |
150000 |
Construction of concrete road from Khadimul Land towards Akib house at Kapasdanga Purba Natunpara1 |
Completion of work |
-
latitude : 23.9117237,23.9117237
Longitude : 88.2710273,88.2710273
file name : Image_26052023155415941.png
|
2023-05-26 15:54:16.00962 |
343 |
57357416 |
Construction of drain with slab from Ajimuddin house towards Kalu house at Nowpukuria Dakshin |
200000 |
Construction of drain with slab from Ajimuddin house towards Kalu house at Nowpukuria Dakshin1 |
Completion of work |
-
latitude : 23.9107273,23.91071736
Longitude : 88.26821833,88.26822287
file name : Image_26052023155435649.png
|
2023-05-26 15:54:35.711377 |
344 |
57372116 |
Construction of side drain with slab near Bharot Mondal house towards Satyacharan Mondal house at H |
170000 |
Construction of side drain with slab near Bharot Mondal house towards Satyacharan Mondal house at H1 |
Plinth level |
-
latitude : 23.9117216,23.90850251
Longitude : 88.2710436,88.25518584
file name : Image_27062023160429058.png
|
2023-06-27 16:04:29.128832 |
345 |
57372116 |
Construction of side drain with slab near Bharot Mondal house towards Satyacharan Mondal house at H |
170000 |
Construction of side drain with slab near Bharot Mondal house towards Satyacharan Mondal house at H1 |
Completion of work |
-
latitude : 23.90850719,23.90849734
Longitude : 88.25522259,88.25522004
file name : Image_26052023155440016.png
|
2023-05-26 15:54:40.088209 |
346 |
57372654 |
Construction of side drain with slab near Ananda Mondal house towards Godadhor Mondal house at Hossa |
70000 |
Construction of side drain with slab near Ananda Mondal house towards Godadhor Mondal house at Hossa1 |
Plinth level |
-
latitude : 23.9117281,23.9117281,23.9117281
Longitude : 88.2710367,88.2710367,88.2710367
file name : Image_23052023154536592.png
|
2023-05-23 15:45:36.65538 |
347 |
57372654 |
Construction of side drain with slab near Ananda Mondal house towards Godadhor Mondal house at Hossa |
70000 |
Construction of side drain with slab near Ananda Mondal house towards Godadhor Mondal house at Hossa1 |
Completion of work |
-
latitude : 23.91051567,23.91050161
Longitude : 88.25487644,88.25486935
file name : Image_12042023111841331.png
|
2023-04-12 11:18:41.400876 |
348 |
57374787 |
Construction of drain with slab from Kamaluddin house towards Baharul house at Nababbari Purba |
140000 |
Construction of drain with slab from Kamaluddin house towards Baharul house at Nababbari Purba1 |
Roof laid |
-
latitude : 23.9117467,23.9117467
Longitude : 88.2710046,88.2710046
file name : Image_31072023130453855.png
|
2023-07-31 13:04:53.956454 |
349 |
57377515 |
Construction of drain with slab from Nizamuddin house towards Ashraful house at Nababbari Paschim |
190000 |
Construction of drain with slab from Nizamuddin house towards Ashraful house at Nababbari Paschim1 |
Plinth level |
-
latitude : 23.9046464,23.9046096
Longitude : 88.2503785,88.2504012
file name : Image_17052023110454335.png
|
2023-05-17 11:04:54.397443 |
350 |
57377515 |
Construction of drain with slab from Nizamuddin house towards Ashraful house at Nababbari Paschim |
190000 |
Construction of drain with slab from Nizamuddin house towards Ashraful house at Nababbari Paschim1 |
Completion of work |
-
latitude : 23.9045469,23.904602
Longitude : 88.2503608,88.2504308
file name : Image_12042023111838414.png
|
2023-04-12 11:18:38.478037 |
351 |
57379975 |
Improvement of drain with slab from Babu shop towards Rob house at NatunPara Paschim |
250000 |
Improvement of drain with slab from Babu shop towards Rob house at NatunPara Paschim1 |
Plinth level |
-
latitude : 23.9117659,23.9117659
Longitude : 88.2710417,88.2710417
file name : Image_05092023125830645.png
|
2023-09-05 12:58:30.721372 |
352 |
57379975 |
Improvement of drain with slab from Babu shop towards Rob house at NatunPara Paschim |
250000 |
Improvement of drain with slab from Babu shop towards Rob house at NatunPara Paschim1 |
Completion of work |
-
latitude : 23.90298914,23.90296049
Longitude : 88.25043497,88.25040699
file name : Image_26052023155443751.png
|
2023-05-26 15:54:43.824209 |
353 |
57394954 |
Construction of ghat from ajabul pond at Kapasdanga paschim para |
90000 |
Construction of ghat from ajabul pond at Kapasdanga paschim para1 |
Plinth level |
-
latitude : 23.9118406
Longitude : 88.2730427
file name : Image_16052023114012377.png
|
2023-05-16 11:40:12.435873 |
354 |
57394954 |
Construction of ghat from ajabul pond at Kapasdanga paschim para |
90000 |
Construction of ghat from ajabul pond at Kapasdanga paschim para1 |
Completion of work |
-
latitude : 23.9118196
Longitude : 88.2728401
file name : Image_12042023111856335.png
|
2023-04-12 11:18:56.404942 |
355 |
57395871 |
Construction of drain with slab from Yousuf doctor house towards Tahidul house at Kapasdanga Paschi |
150000 |
Construction of drain with slab from Yousuf doctor house towards Tahidul house at Kapasdanga Paschi1 |
Plinth level |
-
latitude : 23.9118525,23.9118442
Longitude : 88.2724565,88.2724432
file name : Image_06052023123547334.png
|
2023-05-06 12:35:47.39713 |
356 |
57395871 |
Construction of drain with slab from Yousuf doctor house towards Tahidul house at Kapasdanga Paschi |
150000 |
Construction of drain with slab from Yousuf doctor house towards Tahidul house at Kapasdanga Paschi1 |
Completion of work |
-
latitude : 23.9118542,23.9118356
Longitude : 88.2724267,88.2724288
file name : Image_12042023111850304.png
|
2023-04-12 11:18:50.361711 |
357 |
57399216 |
Extension and repair of drain with cover slab from Jehendar house towards Anarul tee shop |
100000 |
Extension and repair of drain with cover slab from Jehendar house towards Anarul tee shop1 |
Plinth level |
-
latitude : 23.91203623,23.9120831
Longitude : 88.27624606,88.27619709
file name : Image_01082023133210013.png
|
2023-08-01 13:32:10.088896 |
358 |
57399216 |
Extension and repair of drain with cover slab from Jehendar house towards Anarul tee shop |
100000 |
Extension and repair of drain with cover slab from Jehendar house towards Anarul tee shop1 |
Completion of work |
-
latitude : 23.91203573,23.91204027
Longitude : 88.27624696,88.27625129
file name : Image_26052023155427812.png
|
2023-05-26 15:54:27.879398 |
359 |
57677458 |
Construction of saide drain from JAKAR SHOP towards Kader house at Kapasdanga |
150000 |
Construction of saide drain from JAKAR SHOP towards Kader house at Kapasdanga 1 |
Completion of work |
-
latitude : 23.9117237,23.9117237
Longitude : 88.2710273,88.2710273
file name : Image_26052023155400924.png
|
2023-05-26 15:54:00.989236 |
360 |
57681112 |
Construction of drain with slab from kobor sthan jiyaruddin house towards abol hossain house at Ka |
350000 |
Construction of drain with slab from kobor sthan jiyaruddin house towards abol hossain house at Ka1 |
Plinth level |
-
latitude : 23.90958243,23.90954521
Longitude : 88.28550058,88.28557495
file name : Image_16052023114009524.png
|
2023-05-16 11:40:09.611342 |
361 |
57679914 |
Construction of high drain from Natunpara masjid towards Moriara at Kapasdanga Purba Natunpara |
250000 |
Construction of high drain from Natunpara masjid towards Moriara at Kapasdanga Purba Natunpara1 |
Plinth level |
-
latitude : 23.9117237,23.9117237,23.9117237
Longitude : 88.2710273,88.2710273,88.2710273
file name : Image_26052023155412143.png
|
2023-05-26 15:54:12.213647 |
362 |
57679914 |
Construction of high drain from Natunpara masjid towards Moriara at Kapasdanga Purba Natunpara |
250000 |
Construction of high drain from Natunpara masjid towards Moriara at Kapasdanga Purba Natunpara1 |
Completion of work |
-
latitude : 23.9075374,23.9074087
Longitude : 88.28503372,88.285254
file name : Image_12042023111911672.png
|
2023-04-12 11:19:11.735897 |
363 |
57679176 |
Construction of drain with slab from main road towards Anjar Mondal house at Kapasdanga Purbapara |
150000 |
Construction of drain with slab from main road towards Anjar Mondal house at Kapasdanga Purbapara 1 |
Completion of work |
-
latitude : 23.91227747,23.9122815
Longitude : 88.28411807,88.28412027
file name : Image_11112023144823800.png
|
2023-11-11 14:48:23.888321 |
364 |
57679176 |
Construction of drain with slab from main road towards Anjar Mondal house at Kapasdanga Purbapara |
150000 |
Construction of drain with slab from main road towards Anjar Mondal house at Kapasdanga Purbapara 1 |
Completion of work |
-
latitude : 23.9117076,23.9117076
Longitude : 88.2710225,88.2710225
file name : Image_01062023142530410.png
|
2023-06-01 14:25:30.490539 |
365 |
66787295 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.91332051
Longitude : 88.26729816
file name : Image_26062023135520263.png
|
2023-06-26 13:55:20.331623 |
366 |
66787295 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.9136237
Longitude : 88.2660406
file name : Image_12062023141833536.png
|
2023-06-12 14:18:33.593131 |
367 |
66787268 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.91410567
Longitude : 88.27659073
file name : Image_12062023141836522.png
|
2023-06-12 14:18:36.57935 |
368 |
66787084 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.9117257
Longitude : 88.2710337
file name : Image_25062023132541672.png
|
2023-06-25 13:25:41.733656 |
369 |
66786884 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.9117575
Longitude : 88.2710746
file name : Image_25062023132534961.png
|
2023-06-25 13:25:35.024039 |
370 |
66787310 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.91310183
Longitude : 88.28786495
file name : Image_12062023141842746.png
|
2023-06-12 14:18:42.800229 |
371 |
66786972 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.9117095
Longitude : 88.2710359
file name : Image_25062023132443579.png
|
2023-06-25 13:24:43.648556 |
372 |
66786858 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.9117095
Longitude : 88.2710359
file name : Image_25062023132526402.png
|
2023-06-25 13:25:26.471981 |
373 |
66786858 |
Creation of a new source of drinking water |
105000 |
Creation of a new source of drinking water2 |
|
-
latitude : 23.91370314
Longitude : 88.28243382
file name : Image_12062023141839440.png
|
2023-06-12 14:18:39.497455 |
374 |
66786819 |
Creation of a new source of drinking water |
210000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.91252557
Longitude : 88.26383197
file name : Image_26062023135513978.png
|
2023-06-26 13:55:14.054927 |
375 |
66786819 |
Creation of a new source of drinking water |
210000 |
Creation of a new source of drinking water2 |
|
-
latitude : 23.91252113
Longitude : 88.26384887
file name : Image_26062023135517059.png
|
2023-06-26 13:55:17.143228 |
376 |
66787159 |
Creation of a new source of drinking water |
99500 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.91251557
Longitude : 88.26382894
file name : Image_26062023135510966.png
|
2023-06-26 13:55:11.049474 |
377 |
66787112 |
Creation of a new source of drinking water |
199000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.9117107
Longitude : 88.2710336
file name : Image_25062023132356442.png
|
2023-06-25 13:23:56.50945 |
378 |
66786999 |
Creation of a new source of drinking water |
99500 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.9117228
Longitude : 88.271061
file name : Image_06072023161611983.png
|
2023-07-06 16:16:12.042195 |
379 |
66787063 |
Creation of a new source of drinking water |
99500 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.9117228
Longitude : 88.271061
file name : Image_06072023161625105.png
|
2023-07-06 16:16:25.15469 |
380 |
66787040 |
Creation of a new source of drinking water |
99500 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.9117467
Longitude : 88.2710046
file name : Image_31072023130507129.png
|
2023-07-31 13:05:07.201805 |
381 |
66787040 |
Creation of a new source of drinking water |
99500 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.9117228
Longitude : 88.271061
file name : Image_06072023161620482.png
|
2023-07-06 16:16:20.542029 |
382 |
66787219 |
Creation of a new source of drinking water |
99500 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.9117515
Longitude : 88.2860704
file name : Image_14072023135505708.png
|
2023-07-14 13:55:05.773198 |
383 |
66787138 |
Creation of a new source of drinking water |
99500 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.9117467
Longitude : 88.2710046
file name : Image_31072023130500116.png
|
2023-07-31 13:05:00.187235 |
384 |
66787138 |
Creation of a new source of drinking water |
99500 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.9117228
Longitude : 88.271061
file name : Image_06072023161616374.png
|
2023-07-06 16:16:16.450466 |
385 |
66787250 |
Creation of a new source of drinking water |
99250 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.91165299
Longitude : 88.27676032
file name : Image_14072023135502698.png
|
2023-07-14 13:55:02.780037 |
386 |
66786655 |
Creation of a new source of drinking water |
99500 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.9123762
Longitude : 88.2760115
file name : Image_14072023135459530.png
|
2023-07-14 13:54:59.596967 |
387 |
66786941 |
Creation of a new source of drinking water |
99500 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.90304883
Longitude : 88.27494594
file name : Image_01082023133206940.png
|
2023-08-01 13:32:07.041275 |
388 |
57335159 |
Construction of Bharat Nirman Rajeev Gandhi Seva Kendra at Kapasdanga GP office |
2016000 |
Construction of Bharat Nirman Rajeev Gandhi Seva Kendra at Kapasdanga GP office1 |
Plinth level |
-
latitude : 23.9117726
Longitude : 88.2710352
file name : Image_10122023093053531.png
|
2023-12-10 09:30:53.607843 |
389 |
57335159 |
Construction of Bharat Nirman Rajeev Gandhi Seva Kendra at Kapasdanga GP office |
2016000 |
Construction of Bharat Nirman Rajeev Gandhi Seva Kendra at Kapasdanga GP office1 |
Completion of work |
-
latitude : 23.9117596
Longitude : 88.2710037
file name : Image_05092023110757594.png
|
2023-09-05 11:07:57.663453 |
390 |
57333571 |
Construction of concrete road from Hannan house towards dumini bill Kapasdanga Purbamathpara |
125000 |
Construction of concrete road from Hannan house towards dumini bill Kapasdanga Purbamathpara1 |
Plinth level |
-
latitude : 23.91383373,23.91387947
Longitude : 88.28762689,88.28760928
file name : Image_06062023172150679.png
|
2023-06-06 17:21:50.733371 |
391 |
57333571 |
Construction of concrete road from Hannan house towards dumini bill Kapasdanga Purbamathpara |
125000 |
Construction of concrete road from Hannan house towards dumini bill Kapasdanga Purbamathpara1 |
Completion of work |
-
latitude : 23.91373844,23.91373762
Longitude : 88.28752857,88.28751419
file name : Image_26052023155419643.png
|
2023-05-26 15:54:19.715706 |
392 |
57342055 |
Construction of concrete road with culvert from main road towards Mohammad house at Kapasdanga Majh |
240000 |
Construction of concrete road with culvert from main road towards Mohammad house at Kapasdanga Majh1 |
Plinth level |
-
latitude : 23.91049298,23.91049263
Longitude : 88.27761911,88.27759062
file name : Image_01062023114047792.png
|
2023-06-01 11:40:47.885591 |
393 |
57342055 |
Construction of concrete road with culvert from main road towards Mohammad house at Kapasdanga Majh |
240000 |
Construction of concrete road with culvert from main road towards Mohammad house at Kapasdanga Majh1 |
Completion of work |
-
latitude : 23.9117237,23.9117237
Longitude : 88.2710273,88.2710273
file name : Image_26052023155404911.png
|
2023-05-26 15:54:04.973107 |
394 |
67497265 |
Construction of roads |
220000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.91398938,23.91396708
Longitude : 88.26513906,88.26514095
file name : Image_11012024120934771.png
|
2024-01-11 12:09:34.858433 |
395 |
67497265 |
Construction of roads |
220000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.91397734,23.9136169
Longitude : 88.26522645,88.2654324
file name : Image_02012024162634470.png
|
2024-01-02 16:26:34.538381 |
396 |
67497265 |
Construction of roads |
220000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.91399335,23.91400243
Longitude : 88.2651769,88.26517358
file name : Image_30122023150922406.png
|
2023-12-30 15:09:22.474904 |
397 |
57367736 |
Construction of high drain from Saidul Shop towards Asraf house at Nowpukuria Kajipara Dakshin |
130000 |
Construction of high drain from Saidul Shop towards Asraf house at Nowpukuria Kajipara Dakshin1 |
Plinth level |
-
latitude : 23.91373602,23.91375178
Longitude : 88.26612147,88.26615659
file name : Image_09062023133833562.png
|
2023-06-09 13:38:33.620161 |
398 |
57367736 |
Construction of high drain from Saidul Shop towards Asraf house at Nowpukuria Kajipara Dakshin |
130000 |
Construction of high drain from Saidul Shop towards Asraf house at Nowpukuria Kajipara Dakshin1 |
Plinth level |
-
latitude : 23.9117288,23.9117288
Longitude : 88.2710304,88.2710304
file name : Image_17052023110501445.png
|
2023-05-17 11:05:01.509262 |
399 |
57367736 |
Construction of high drain from Saidul Shop towards Asraf house at Nowpukuria Kajipara Dakshin |
130000 |
Construction of high drain from Saidul Shop towards Asraf house at Nowpukuria Kajipara Dakshin1 |
Completion of work |
-
latitude : 23.91346,23.913461
Longitude : 88.2662727,88.2662719
file name : Image_12042023111847513.png
|
2023-04-12 11:18:47.57725 |
400 |
67497136 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.91219912,23.91225488
Longitude : 88.28713415,88.28716205
file name : Image_11012024131014566.png
|
2024-01-11 13:10:14.630264 |
401 |
67497136 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.91199359,23.91199185
Longitude : 88.28713357,88.28713773
file name : Image_04012024122128622.png
|
2024-01-04 12:21:28.714751 |
402 |
67497136 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.91197623,23.91220921
Longitude : 88.28575627,88.28715213
file name : Image_30122023151024264.png
|
2023-12-30 15:10:24.341958 |
403 |
67496179 |
Construction of roads |
175000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.9141709,23.91421122
Longitude : 88.27651422,88.27642238
file name : Image_24072024102748422.png
|
2024-07-24 10:27:48.48681 |
404 |
67496179 |
Construction of roads |
175000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.91239176,23.91418885
Longitude : 88.27559711,88.27648368
file name : Image_18072024170644225.png
|
2024-07-18 17:06:44.209633 |
405 |
67496179 |
Construction of roads |
175000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.9142199,23.91426081,23.91421216
Longitude : 88.27658867,88.27661705,88.27658857
file name : Image_30122023151003803.png
|
2023-12-30 15:10:03.884197 |
406 |
57342442 |
Construction of concrete road from Babu house towards Imamuddin house at Kapasdanga |
150000 |
Construction of concrete road from Babu house towards Imamuddin house at Kapasdanga1 |
Roof laid |
-
latitude : 23.90958976,23.90959941
Longitude : 88.27555856,88.27557278
file name : Image_11012024121007241.png
|
2024-01-11 12:10:07.312466 |
407 |
57342442 |
Construction of concrete road from Babu house towards Imamuddin house at Kapasdanga |
150000 |
Construction of concrete road from Babu house towards Imamuddin house at Kapasdanga1 |
Plinth level |
-
latitude : 23.90954598,23.90954199,23.90953862
Longitude : 88.27563242,88.27562149,88.27561657
file name : Image_07012024144732069.png
|
2024-01-07 14:47:32.137151 |
408 |
57342442 |
Construction of concrete road from Babu house towards Imamuddin house at Kapasdanga |
150000 |
Construction of concrete road from Babu house towards Imamuddin house at Kapasdanga1 |
Completion of work |
-
latitude : 23.9095616,23.9096228
Longitude : 88.27560594,88.27560034
file name : Image_30122023151045269.png
|
2023-12-30 15:10:45.361735 |
409 |
57233933 |
Construction of concrete road from main road with bamboo pailling towards Muluk bagan at Natunpara P |
118000 |
Construction of concrete road from main road with bamboo pailling towards Muluk bagan at Natunpara P1 |
Plinth level |
-
latitude : 23.90169366,23.90168924
Longitude : 88.25024427,88.25026241
file name : Image_17042023105805442.png
|
2023-04-17 10:58:05.503975 |
410 |
57233933 |
Construction of concrete road from main road with bamboo pailling towards Muluk bagan at Natunpara P |
118000 |
Construction of concrete road from main road with bamboo pailling towards Muluk bagan at Natunpara P1 |
Completion of work |
-
latitude : 23.9016815,23.90168318
Longitude : 88.25021499,88.25022528
file name : Image_12042023111832274.png
|
2023-04-12 11:18:32.33533 |
411 |
57235698 |
Construction of concrete road from Bablatola Jamirul house towards Ajmail house via Sentu house at K |
105000 |
Construction of concrete road from Bablatola Jamirul house towards Ajmail house via Sentu house at K1 |
Completion of work |
-
latitude : 23.9118163,23.9118167
Longitude : 88.272978,88.272979
file name : Image_12042023111853167.png
|
2023-04-12 11:18:53.227495 |
412 |
57236085 |
Construction of concrete road from Arjamal house towards Sahajamal house at Kapasdanga Paschimpara |
80000 |
Construction of concrete road from Arjamal house towards Sahajamal house at Kapasdanga Paschimpara1 |
Plinth level |
-
latitude : 23.91205549,23.91242643
Longitude : 88.27259435,88.27222826
file name : Image_12062023141848619.png
|
2023-06-12 14:18:48.676085 |
413 |
57236085 |
Construction of concrete road from Arjamal house towards Sahajamal house at Kapasdanga Paschimpara |
80000 |
Construction of concrete road from Arjamal house towards Sahajamal house at Kapasdanga Paschimpara1 |
Completion of work |
-
latitude : 23.9117237,23.9117237
Longitude : 88.2710273,88.2710273
file name : Image_26052023155356750.png
|
2023-05-26 15:53:56.840304 |
414 |
57236446 |
Construction of concrete road from Safikul house towards Asraful house at Kapasdanga paschimpara |
50000 |
Construction of concrete road from Safikul house towards Asraful house at Kapasdanga paschimpara1 |
Plinth level |
-
latitude : 23.9119009,23.9118564
Longitude : 88.272429,88.2724362
file name : Image_12062023141845598.png
|
2023-06-12 14:18:45.663006 |
415 |
57324128 |
Construction of concrete road from main road towards Amiruddin house at Kapasdanga |
90000 |
Construction of concrete road from main road towards Amiruddin house at Kapasdanga1 |
Plinth level |
-
latitude : 23.90963842,23.90970725
Longitude : 88.27498032,88.27491858
file name : Image_01062023114044810.png
|
2023-06-01 11:40:44.879295 |
416 |
57324128 |
Construction of concrete road from main road towards Amiruddin house at Kapasdanga |
90000 |
Construction of concrete road from main road towards Amiruddin house at Kapasdanga1 |
Plinth level |
-
latitude : 23.9117055,23.9117055
Longitude : 88.2710227,88.2710227
file name : Image_02062023173657935.png
|
2023-06-02 17:36:57.997663 |
417 |
57324128 |
Construction of concrete road from main road towards Amiruddin house at Kapasdanga |
90000 |
Construction of concrete road from main road towards Amiruddin house at Kapasdanga1 |
Completion of work |
-
latitude : 23.90970295,23.90970856
Longitude : 88.27499562,88.27495221
file name : Image_26052023155431812.png
|
2023-05-26 15:54:31.878599 |
418 |
57326478 |
Construction of concrete road from Shukurulla house towards DinMohammad house at Kapasdanga Purbapar |
150000 |
Construction of concrete road from Shukurulla house towards DinMohammad house at Kapasdanga Purbapar1 |
Plinth level |
-
latitude : 23.91330041,23.91330289
Longitude : 88.28150531,88.28146414
file name : Image_01062023114051086.png
|
2023-06-01 11:40:51.17863 |
419 |
57326478 |
Construction of concrete road from Shukurulla house towards DinMohammad house at Kapasdanga Purbapar |
150000 |
Construction of concrete road from Shukurulla house towards DinMohammad house at Kapasdanga Purbapar1 |
Completion of work |
-
latitude : 23.91327162,23.91331952
Longitude : 88.28137937,88.28139739
file name : Image_26052023155423536.png
|
2023-05-26 15:54:23.602431 |
420 |
57332719 |
Construction of finishing work at kapasdanga MSK Kapasdanga Purbamathpara |
200000 |
Construction of finishing work at kapasdanga MSK Kapasdanga Purbamathpara1 |
Plinth level |
-
latitude : 23.9117588
Longitude : 88.2860544
file name : Image_11112023144826632.png
|
2023-11-11 14:48:26.709158 |
421 |
57332719 |
Construction of finishing work at kapasdanga MSK Kapasdanga Purbamathpara |
200000 |
Construction of finishing work at kapasdanga MSK Kapasdanga Purbamathpara1 |
Plinth level |
-
latitude : 23.9111795
Longitude : 88.2857225
file name : Image_30042023154304925.png
|
2023-04-30 15:43:04.986366 |
422 |
57332719 |
Construction of finishing work at kapasdanga MSK Kapasdanga Purbamathpara |
200000 |
Construction of finishing work at kapasdanga MSK Kapasdanga Purbamathpara1 |
Completion of work |
-
latitude : 23.91128156
Longitude : 88.28568456
file name : Image_12042023111908715.png
|
2023-04-12 11:19:08.777651 |
423 |
67377049 |
Construction of roads |
250000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.9222769,23.90603741,23.90611278
Longitude : 88.2754663,88.28183355,88.2817066
file name : Image_12012024212814006.png
|
2024-01-12 21:28:14.064252 |
424 |
67377049 |
Construction of roads |
250000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.90605967,23.90605814
Longitude : 88.28174381,88.28172418
file name : Image_11012024131037585.png
|
2024-01-11 13:10:37.660349 |
425 |
67377049 |
Construction of roads |
250000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.90601349,23.90601529
Longitude : 88.28178013,88.28179849
file name : Image_07012024123555125.png
|
2024-01-07 12:35:55.188867 |
426 |
67377049 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.9065122,23.9065116
Longitude : 88.2806164,88.2806147
file name : Image_30122023151031411.png
|
2023-12-30 15:10:31.49875 |
427 |
67539921 |
Operation & maintenance of Grey water management system |
150000 |
Operation & maintenance of Grey water management system1 |
Plinth level |
-
latitude : 23.91329876
Longitude : 88.26331948
file name : Image_30112023121742010.png
|
2023-11-30 12:17:42.07606 |
428 |
67539921 |
Operation & maintenance of Grey water management system |
150000 |
Operation & maintenance of Grey water management system1 |
Completion of work |
-
latitude : 23.91333513
Longitude : 88.26331321
file name : Image_26112023170907680.png
|
2023-11-26 17:09:07.744498 |
429 |
67540158 |
Repair of drainage channel |
150000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 23.90945967
Longitude : 88.25513425
file name : Image_30112023121744944.png
|
2023-11-30 12:17:45.004532 |
430 |
67540158 |
Repair of drainage channel |
150000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 23.90952924
Longitude : 88.25520311
file name : Image_26112023170904548.png
|
2023-11-26 17:09:04.616514 |
431 |
67540349 |
Repair of drainage channel |
150000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 23.91234349
Longitude : 88.25390767
file name : Image_30112023121747876.png
|
2023-11-30 12:17:47.955785 |
432 |
67540349 |
Repair of drainage channel |
150000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 23.91234724
Longitude : 88.25390589
file name : Image_26112023170901458.png
|
2023-11-26 17:09:01.523031 |
433 |
67540458 |
Repair of drainage channel |
150000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 23.9118172
Longitude : 88.27247892
file name : Image_30112023121738954.png
|
2023-11-30 12:17:39.016134 |
434 |
67540458 |
Repair of drainage channel |
150000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 23.9118135
Longitude : 88.2724429
file name : Image_26112023170910524.png
|
2023-11-26 17:09:10.58916 |
435 |
67540596 |
Repair of drainage channel |
150000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 23.91259594
Longitude : 88.27589198
file name : Image_30112023121732601.png
|
2023-11-30 12:17:32.673125 |
436 |
67540596 |
Repair of drainage channel |
150000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 23.9122222
Longitude : 88.2736421
file name : Image_26112023170916593.png
|
2023-11-26 17:09:16.662151 |
437 |
57359898 |
Sinking Mark II Tubewell with platform and soakpit Koborsthan at nowpukuria Dakshin |
100000 |
Sinking Mark II Tubewell with platform and soakpit Koborsthan at nowpukuria Dakshin1 |
Roof laid |
-
latitude : 23.9111446
Longitude : 88.26814079
file name : Image_11012024120845963.png
|
2024-01-11 12:08:46.043739 |
438 |
57359898 |
Sinking Mark II Tubewell with platform and soakpit Koborsthan at nowpukuria Dakshin |
100000 |
Sinking Mark II Tubewell with platform and soakpit Koborsthan at nowpukuria Dakshin1 |
Plinth level |
-
latitude : 23.9112262
Longitude : 88.26825365
file name : Image_30122023150847660.png
|
2023-12-30 15:08:47.726939 |
439 |
57359898 |
Sinking Mark II Tubewell with platform and soakpit Koborsthan at nowpukuria Dakshin |
100000 |
Sinking Mark II Tubewell with platform and soakpit Koborsthan at nowpukuria Dakshin1 |
Completion of work |
-
latitude : 23.91107026
Longitude : 88.26827719
file name : Image_12122023150244264.png
|
2023-12-12 15:02:44.342038 |
440 |
57364269 |
Sinking Mark II Tubewell with platform and soakpit near Saidul house at nowpukuria Dakshin |
100000 |
Sinking Mark II Tubewell with platform and soakpit near Saidul house at nowpukuria Dakshin1 |
Roof laid |
-
latitude : 23.90981249
Longitude : 88.26712666
file name : Image_11012024120851086.png
|
2024-01-11 12:08:51.179688 |
441 |
57364269 |
Sinking Mark II Tubewell with platform and soakpit near Saidul house at nowpukuria Dakshin |
100000 |
Sinking Mark II Tubewell with platform and soakpit near Saidul house at nowpukuria Dakshin1 |
Plinth level |
-
latitude : 23.90981862
Longitude : 88.26719049
file name : Image_30122023150904671.png
|
2023-12-30 15:09:04.746556 |
442 |
57364269 |
Sinking Mark II Tubewell with platform and soakpit near Saidul house at nowpukuria Dakshin |
100000 |
Sinking Mark II Tubewell with platform and soakpit near Saidul house at nowpukuria Dakshin1 |
Completion of work |
-
latitude : 23.90958219
Longitude : 88.26692799
file name : Image_12122023150247386.png
|
2023-12-12 15:02:47.455882 |
443 |
57373517 |
Sinking Mark II Tubewell with platform and soakpit Sudhir Mondal at Hossainpur |
100000 |
Sinking Mark II Tubewell with platform and soakpit Sudhir Mondal at Hossainpur1 |
Roof laid |
-
latitude : 23.90499004
Longitude : 88.25793355
file name : Image_11012024120856121.png
|
2024-01-11 12:08:56.202192 |
444 |
57373517 |
Sinking Mark II Tubewell with platform and soakpit Sudhir Mondal at Hossainpur |
100000 |
Sinking Mark II Tubewell with platform and soakpit Sudhir Mondal at Hossainpur1 |
Plinth level |
-
latitude : 23.90498822
Longitude : 88.25786401
file name : Image_04012024122124756.png
|
2024-01-04 12:21:24.833459 |
445 |
57373517 |
Sinking Mark II Tubewell with platform and soakpit Sudhir Mondal at Hossainpur |
100000 |
Sinking Mark II Tubewell with platform and soakpit Sudhir Mondal at Hossainpur1 |
Completion of work |
-
latitude : 23.90532644
Longitude : 88.25838374
file name : Image_12122023150250969.png
|
2023-12-12 15:02:51.048636 |
446 |
57375638 |
Sinking Mark II Tubewell with platform and soakpit Near Aman Faraji at Nababbari Purba |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Aman Faraji at Nababbari Purba1 |
Plinth level |
-
latitude : 23.9064887
Longitude : 88.2805742
file name : Image_11012024131042184.png
|
2024-01-11 13:10:42.262757 |
447 |
57375638 |
Sinking Mark II Tubewell with platform and soakpit Near Aman Faraji at Nababbari Purba |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Aman Faraji at Nababbari Purba1 |
Plinth level |
-
latitude : 23.9064993
Longitude : 88.280566
file name : Image_07012024123550771.png
|
2024-01-07 12:35:50.834575 |
448 |
57375638 |
Sinking Mark II Tubewell with platform and soakpit Near Aman Faraji at Nababbari Purba |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Aman Faraji at Nababbari Purba1 |
Completion of work |
-
latitude : 23.90618439
Longitude : 88.28080896
file name : Image_16122023210909194.png
|
2023-12-16 21:09:09.294441 |
449 |
57680870 |
Sinking Mark II Tubewell with platform and soakpit Near natun para masjid at Kapasdanga Purba natunp |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near natun para masjid at Kapasdanga Purba natunp1 |
Roof laid |
-
latitude : 23.9073593
Longitude : 88.2852694
file name : Image_11012024131027957.png
|
2024-01-11 13:10:28.026178 |
450 |
57680870 |
Sinking Mark II Tubewell with platform and soakpit Near natun para masjid at Kapasdanga Purba natunp |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near natun para masjid at Kapasdanga Purba natunp1 |
Plinth level |
-
latitude : 23.90695494
Longitude : 88.28468379
file name : Image_17122023124308602.png
|
2023-12-17 12:43:08.663559 |
451 |
57680870 |
Sinking Mark II Tubewell with platform and soakpit Near natun para masjid at Kapasdanga Purba natunp |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near natun para masjid at Kapasdanga Purba natunp1 |
Completion of work |
-
latitude : 23.90766944
Longitude : 88.28503585
file name : Image_12122023150233786.png
|
2023-12-12 15:02:33.856118 |
452 |
57678830 |
Sinking Mark II Tubewell with platform and soakpit Near Laharpara idghatala at Kapasdanga |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Laharpara idghatala at Kapasdanga 1 |
Roof laid |
-
latitude : 23.9084692
Longitude : 88.27411339
file name : Image_11012024120957099.png
|
2024-01-11 12:09:57.197611 |
453 |
57678830 |
Sinking Mark II Tubewell with platform and soakpit Near Laharpara idghatala at Kapasdanga |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Laharpara idghatala at Kapasdanga 1 |
Plinth level |
-
latitude : 23.90838341
Longitude : 88.27418255
file name : Image_23122023134054560.png
|
2023-12-23 13:40:54.632918 |
454 |
57678830 |
Sinking Mark II Tubewell with platform and soakpit Near Laharpara idghatala at Kapasdanga |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Laharpara idghatala at Kapasdanga 1 |
Completion of work |
-
latitude : 23.9117785
Longitude : 88.2710554
file name : Image_12122023150211466.png
|
2023-12-12 15:02:11.536872 |
455 |
57678195 |
Sinking Mark II Tubewell with platform and soakpit Near LaharPara ICDS Center at Kapasdanga Majhpara |
98000 |
Sinking Mark II Tubewell with platform and soakpit Near LaharPara ICDS Center at Kapasdanga Majhpara1 |
Roof laid |
-
latitude : 23.90994539
Longitude : 88.27436132
file name : Image_11012024120951970.png
|
2024-01-11 12:09:52.054505 |
456 |
57678195 |
Sinking Mark II Tubewell with platform and soakpit Near LaharPara ICDS Center at Kapasdanga Majhpara |
98000 |
Sinking Mark II Tubewell with platform and soakpit Near LaharPara ICDS Center at Kapasdanga Majhpara1 |
Plinth level |
-
latitude : 23.9098867
Longitude : 88.27440848
file name : Image_25122023115225533.png
|
2023-12-25 11:52:25.243516 |
457 |
57678195 |
Sinking Mark II Tubewell with platform and soakpit Near LaharPara ICDS Center at Kapasdanga Majhpara |
98000 |
Sinking Mark II Tubewell with platform and soakpit Near LaharPara ICDS Center at Kapasdanga Majhpara1 |
Plinth level |
-
latitude : 23.9098867
Longitude : 88.27440848
file name : Image_25122023115206020.png
|
2023-12-25 11:52:05.942816 |
458 |
57678195 |
Sinking Mark II Tubewell with platform and soakpit Near LaharPara ICDS Center at Kapasdanga Majhpara |
98000 |
Sinking Mark II Tubewell with platform and soakpit Near LaharPara ICDS Center at Kapasdanga Majhpara1 |
Completion of work |
-
latitude : 23.9117785
Longitude : 88.2710554
file name : Image_12122023150207302.png
|
2023-12-12 15:02:07.38194 |
459 |
57680490 |
Sinking Mark II Tubewell with platform and soakpit Near Baddanga at Kapasdanga Purba natunpara |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Baddanga at Kapasdanga Purba natunpara1 |
Roof laid |
-
latitude : 23.9038112
Longitude : 88.2843524
file name : Image_11012024131032723.png
|
2024-01-11 13:10:32.791755 |
460 |
57680490 |
Sinking Mark II Tubewell with platform and soakpit Near Baddanga at Kapasdanga Purba natunpara |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Baddanga at Kapasdanga Purba natunpara1 |
Plinth level |
-
latitude : 23.90385096
Longitude : 88.28436773
file name : Image_17122023124302182.png
|
2023-12-17 12:43:02.240631 |
461 |
57680490 |
Sinking Mark II Tubewell with platform and soakpit Near Baddanga at Kapasdanga Purba natunpara |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Baddanga at Kapasdanga Purba natunpara1 |
Completion of work |
-
latitude : 23.90418073
Longitude : 88.28433507
file name : Image_12122023150225999.png
|
2023-12-12 15:02:26.081635 |
462 |
57679593 |
Sinking Mark II Tubewell with platform and soakpit Near Sishu Madrasha at Kapasdanga Purbapara |
98000 |
Sinking Mark II Tubewell with platform and soakpit Near Sishu Madrasha at Kapasdanga Purbapara 1 |
Roof laid |
-
latitude : 23.9135436
Longitude : 88.2825132
file name : Image_11012024131003901.png
|
2024-01-11 13:10:03.973217 |
463 |
57679593 |
Sinking Mark II Tubewell with platform and soakpit Near Sishu Madrasha at Kapasdanga Purbapara |
98000 |
Sinking Mark II Tubewell with platform and soakpit Near Sishu Madrasha at Kapasdanga Purbapara 1 |
Plinth level |
-
latitude : 23.91349259
Longitude : 88.2826616
file name : Image_23122023134114778.png
|
2023-12-23 13:41:14.606106 |
464 |
57679593 |
Sinking Mark II Tubewell with platform and soakpit Near Sishu Madrasha at Kapasdanga Purbapara |
98000 |
Sinking Mark II Tubewell with platform and soakpit Near Sishu Madrasha at Kapasdanga Purbapara 1 |
Completion of work |
-
latitude : 23.91366074
Longitude : 88.28256807
file name : Image_12122023150238729.png
|
2023-12-12 15:02:38.80547 |
465 |
57678499 |
Sinking Mark II Tubewell with platform and soakpit Near Majhpara idghatala at Kapasdanga Majhpara |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Majhpara idghatala at Kapasdanga Majhpara 1 |
Roof laid |
-
latitude : 23.9070045
Longitude : 88.28011121
file name : Image_31012024091112453.png
|
2024-01-31 09:11:12.527672 |
466 |
57678499 |
Sinking Mark II Tubewell with platform and soakpit Near Majhpara idghatala at Kapasdanga Majhpara |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Majhpara idghatala at Kapasdanga Majhpara 1 |
Plinth level |
-
latitude : 23.90701806
Longitude : 88.2800062
file name : Image_23122023134103758.png
|
2023-12-23 13:41:03.828803 |
467 |
57678499 |
Sinking Mark II Tubewell with platform and soakpit Near Majhpara idghatala at Kapasdanga Majhpara |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Majhpara idghatala at Kapasdanga Majhpara 1 |
Completion of work |
-
latitude : 23.90716342
Longitude : 88.27993875
file name : Image_12122023150215579.png
|
2023-12-12 15:02:15.66527 |
468 |
57400932 |
Sinking Mark II Tubewell with platform and soakpit Near nonagari football math at Kapasdanga Majhpar |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near nonagari football math at Kapasdanga Majhpar1 |
Roof laid |
-
latitude : 23.9064897
Longitude : 88.280575
file name : Image_11012024131051168.png
|
2024-01-11 13:10:51.231672 |
469 |
57400932 |
Sinking Mark II Tubewell with platform and soakpit Near nonagari football math at Kapasdanga Majhpar |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near nonagari football math at Kapasdanga Majhpar1 |
Roof laid |
-
latitude : 23.9064897
Longitude : 88.280575
file name : Image_11012024131046885.png
|
2024-01-11 13:10:46.952628 |
470 |
57400932 |
Sinking Mark II Tubewell with platform and soakpit Near nonagari football math at Kapasdanga Majhpar |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near nonagari football math at Kapasdanga Majhpar1 |
Plinth level |
-
latitude : 23.90659192
Longitude : 88.28067657
file name : Image_17122023165034117.png
|
2023-12-17 16:50:34.184849 |
471 |
57400932 |
Sinking Mark II Tubewell with platform and soakpit Near nonagari football math at Kapasdanga Majhpar |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near nonagari football math at Kapasdanga Majhpar1 |
Completion of work |
-
latitude : 23.90665018
Longitude : 88.28085646
file name : Image_12122023150219461.png
|
2023-12-12 15:02:19.525935 |
472 |
57393551 |
Sinking Mark II Tubewell with platform and soakpit Near Akbor Doctor house at kapasdanga paschimpara |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Akbor Doctor house at kapasdanga paschimpara1 |
Roof laid |
-
latitude : 23.9118658
Longitude : 88.272373
file name : Image_11012024142514628.png
|
2024-01-11 14:25:14.694164 |
473 |
57393551 |
Sinking Mark II Tubewell with platform and soakpit Near Akbor Doctor house at kapasdanga paschimpara |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Akbor Doctor house at kapasdanga paschimpara1 |
Plinth level |
-
latitude : 23.9118655
Longitude : 88.2723141
file name : Image_11012024092939042.png
|
2024-01-11 09:29:39.108008 |
474 |
57393551 |
Sinking Mark II Tubewell with platform and soakpit Near Akbor Doctor house at kapasdanga paschimpara |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Akbor Doctor house at kapasdanga paschimpara1 |
Completion of work |
-
latitude : 23.9117785
Longitude : 88.2710554
file name : Image_12122023150203017.png
|
2023-12-12 15:02:03.103785 |
475 |
57390405 |
Sinking Mark II Tubewell with platform and soakpit Near NatunPara yuboksangha club at natunpara Purb |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near NatunPara yuboksangha club at natunpara Purb1 |
Plinth level |
-
latitude : 23.89791069
Longitude : 88.25007531
file name : Image_11012024120929977.png
|
2024-01-11 12:09:30.055344 |
476 |
57390405 |
Sinking Mark II Tubewell with platform and soakpit Near NatunPara yuboksangha club at natunpara Purb |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near NatunPara yuboksangha club at natunpara Purb1 |
Plinth level |
-
latitude : 23.8989426
Longitude : 88.2491107
file name : Image_07012024123546342.png
|
2024-01-07 12:35:46.398594 |
477 |
57390405 |
Sinking Mark II Tubewell with platform and soakpit Near NatunPara yuboksangha club at natunpara Purb |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near NatunPara yuboksangha club at natunpara Purb1 |
Completion of work |
-
latitude : 23.89789884
Longitude : 88.25015386
file name : Image_12122023150257384.png
|
2023-12-12 15:02:57.485426 |
478 |
57388520 |
Sinking Mark II Tubewell with platform and soakpit Near Mohidur house at natunpara Paschim |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Mohidur house at natunpara Paschim1 |
Roof laid |
-
latitude : 23.90308661
Longitude : 88.24942109
file name : Image_11012024120918459.png
|
2024-01-11 12:09:18.538945 |
479 |
57388520 |
Sinking Mark II Tubewell with platform and soakpit Near Mohidur house at natunpara Paschim |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Mohidur house at natunpara Paschim1 |
Plinth level |
-
latitude : 23.90302365
Longitude : 88.24952228
file name : Image_07012024123537263.png
|
2024-01-07 12:35:37.329076 |
480 |
57388520 |
Sinking Mark II Tubewell with platform and soakpit Near Mohidur house at natunpara Paschim |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Mohidur house at natunpara Paschim1 |
Completion of work |
-
latitude : 23.90315171
Longitude : 88.24948135
file name : Image_20122023165028957.png
|
2023-12-20 16:50:29.02231 |
481 |
57387658 |
Sinking Mark II Tubewell with platform and soakpit Near Transmitar at natunpara Paschim |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Transmitar at natunpara Paschim1 |
Roof laid |
-
latitude : 23.89747927
Longitude : 88.24755561
file name : Image_11012024120925068.png
|
2024-01-11 12:09:25.138857 |
482 |
57387658 |
Sinking Mark II Tubewell with platform and soakpit Near Transmitar at natunpara Paschim |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Transmitar at natunpara Paschim1 |
Plinth level |
-
latitude : 23.89741119
Longitude : 88.24756032
file name : Image_07012024123541851.png
|
2024-01-07 12:35:41.907844 |
483 |
57387658 |
Sinking Mark II Tubewell with platform and soakpit Near Transmitar at natunpara Paschim |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Transmitar at natunpara Paschim1 |
Completion of work |
-
latitude : 23.89711491
Longitude : 88.24804094
file name : Image_12122023150254273.png
|
2023-12-12 15:02:54.344398 |
484 |
57379308 |
Sinking Mark II Tubewell with platform and soakpit Near Nababbari R.C.H at Nababbari Paschim |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Nababbari R.C.H at Nababbari Paschim1 |
Roof laid |
-
latitude : 23.9082417
Longitude : 88.2524381
file name : Image_11012024120908324.png
|
2024-01-11 12:09:08.395333 |
485 |
57379308 |
Sinking Mark II Tubewell with platform and soakpit Near Nababbari R.C.H at Nababbari Paschim |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Nababbari R.C.H at Nababbari Paschim1 |
Plinth level |
-
latitude : 23.90852993
Longitude : 88.25201417
file name : Image_07012024123532903.png
|
2024-01-07 12:35:32.969726 |
486 |
57379308 |
Sinking Mark II Tubewell with platform and soakpit Near Nababbari R.C.H at Nababbari Paschim |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Nababbari R.C.H at Nababbari Paschim1 |
Completion of work |
-
latitude : 23.90700707
Longitude : 88.25201351
file name : Image_12122023150307403.png
|
2023-12-12 15:03:07.511431 |
487 |
57378542 |
Sinking Mark II Tubewell with platform and soakpit Near Football math at Nababbari Paschim |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Football math at Nababbari Paschim1 |
Roof laid |
-
latitude : 23.90709245
Longitude : 88.2495511
file name : Image_17022024093212225.png
|
2024-02-17 09:32:12.332288 |
488 |
57378542 |
Sinking Mark II Tubewell with platform and soakpit Near Football math at Nababbari Paschim |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Football math at Nababbari Paschim1 |
Plinth level |
-
latitude : 23.90714253
Longitude : 88.249522
file name : Image_07022024122218451.png
|
2024-02-07 12:22:18.523116 |
489 |
57378542 |
Sinking Mark II Tubewell with platform and soakpit Near Football math at Nababbari Paschim |
100000 |
Sinking Mark II Tubewell with platform and soakpit Near Football math at Nababbari Paschim1 |
Completion of work |
-
latitude : 23.9071176
Longitude : 88.24956928
file name : Image_12122023150302254.png
|
2023-12-12 15:03:02.376216 |
490 |
47105169 |
Installation of the Sanitary napkin vending machine at Kapasdanga Health Sub Centre |
45000 |
Installation of the Sanitary napkin vending machine at Kapasdanga Health Sub Centre1 |
Plinth level |
-
latitude : 23.9117288
Longitude : 88.2710304
file name : Image_17052023110457810.png
|
2023-05-17 11:04:57.86865 |
491 |
47105169 |
Installation of the Sanitary napkin vending machine at Kapasdanga Health Sub Centre |
45000 |
Installation of the Sanitary napkin vending machine at Kapasdanga Health Sub Centre1 |
Completion of work |
-
latitude : 23.9117127
Longitude : 88.2710355
file name : Image_05052023144446042.png
|
2023-05-05 14:44:46.101563 |
492 |
67647527 |
Computer in GP Bhawan |
535000 |
Computer in GP Bhawan1 |
Plinth level |
-
latitude : 23.9118067
Longitude : 88.2710607
file name : Image_27122023161106468.png
|
2023-12-27 16:11:06.531767 |
493 |
67647527 |
Computer in GP Bhawan |
535000 |
Computer in GP Bhawan1 |
Completion of work |
-
latitude : 23.9118064
Longitude : 88.2710611
file name : Image_27122023155844697.png
|
2023-12-27 15:58:44.765612 |
494 |
67647527 |
Computer in GP Bhawan |
535000 |
Computer in GP Bhawan1 |
Completion of work |
-
latitude : 23.9118064
Longitude : 88.2710611
file name : Image_27122023155830399.png
|
2023-12-27 15:58:30.461564 |
495 |
57370014 |
Construction of side drain with slab near Mojid house towards Primary School at jitpur Dighirpara |
200000 |
Construction of side drain with slab near Mojid house towards Primary School at jitpur Dighirpara1 |
Plinth level |
-
latitude : 23.90220586,23.90220886
Longitude : 88.27501897,88.27502909
file name : Image_14012024153635463.png
|
2024-01-14 15:36:35.526164 |
496 |
57370014 |
Construction of side drain with slab near Mojid house towards Primary School at jitpur Dighirpara |
200000 |
Construction of side drain with slab near Mojid house towards Primary School at jitpur Dighirpara1 |
Plinth level |
-
latitude : 23.90220586,23.90220886
Longitude : 88.27501897,88.27502909
file name : Image_14012024153617292.png
|
2024-01-14 15:36:17.353188 |
497 |
57370014 |
Construction of side drain with slab near Mojid house towards Primary School at jitpur Dighirpara |
200000 |
Construction of side drain with slab near Mojid house towards Primary School at jitpur Dighirpara1 |
Plinth level |
-
latitude : 23.90226248,23.90225893
Longitude : 88.27501749,88.27500005
file name : Image_11012024121002313.png
|
2024-01-11 12:10:02.403384 |
498 |
57370014 |
Construction of side drain with slab near Mojid house towards Primary School at jitpur Dighirpara |
200000 |
Construction of side drain with slab near Mojid house towards Primary School at jitpur Dighirpara1 |
Completion of work |
-
latitude : 23.91069335,23.90315283
Longitude : 88.27430642,88.27508235
file name : Image_17122023124355022.png
|
2023-12-17 12:43:55.083698 |
499 |
57354638 |
Construction of Drain road from Nowpukuria mathpara concrete road towards math para ICDS centre |
200000 |
Construction of Drain road from Nowpukuria mathpara concrete road towards math para ICDS centre 1 |
Plinth level |
-
latitude : 23.9111324,23.9111339
Longitude : 88.267449,88.2674539
file name : Image_14012024153621955.png
|
2024-01-14 15:36:22.020944 |
500 |
57354638 |
Construction of Drain road from Nowpukuria mathpara concrete road towards math para ICDS centre |
200000 |
Construction of Drain road from Nowpukuria mathpara concrete road towards math para ICDS centre 1 |
Completion of work |
-
latitude : 23.9111267,23.9111267
Longitude : 88.2674537,88.2674537
file name : Image_17122023124516423.png
|
2023-12-17 12:45:16.486217 |
501 |
57327774 |
Construction of concrete road from Nengru dhar towards Ajarul house at Kapasdanga Purbamathpara |
150000 |
Construction of concrete road from Nengru dhar towards Ajarul house at Kapasdanga Purbamathpara1 |
Roof laid |
-
latitude : 23.91320604,23.91322628,23.91323262
Longitude : 88.287974,88.28795199,88.28796987
file name : Image_11012024131018565.png
|
2024-01-11 13:10:18.635968 |
502 |
57327774 |
Construction of concrete road from Nengru dhar towards Ajarul house at Kapasdanga Purbamathpara |
150000 |
Construction of concrete road from Nengru dhar towards Ajarul house at Kapasdanga Purbamathpara1 |
Plinth level |
-
latitude : 23.91320872,23.91320334
Longitude : 88.28797894,88.28797939
file name : Image_07012024144749999.png
|
2024-01-07 14:47:50.073378 |
503 |
57327774 |
Construction of concrete road from Nengru dhar towards Ajarul house at Kapasdanga Purbamathpara |
150000 |
Construction of concrete road from Nengru dhar towards Ajarul house at Kapasdanga Purbamathpara1 |
Completion of work |
-
latitude : 23.91324006,23.9132644
Longitude : 88.28765869,88.28775946
file name : Image_17122023124321916.png
|
2023-12-17 12:43:21.98179 |
504 |
57327336 |
Construction of concrete road from main road towards Azad house at Kapasdanga Purba Natunpara |
100000 |
Construction of concrete road from main road towards Azad house at Kapasdanga Purba Natunpara1 |
Roof laid |
-
latitude : 23.90721405,23.90726835
Longitude : 88.28430514,88.28428151
file name : Image_11012024131023575.png
|
2024-01-11 13:10:23.652572 |
505 |
57327336 |
Construction of concrete road from main road towards Azad house at Kapasdanga Purba Natunpara |
100000 |
Construction of concrete road from main road towards Azad house at Kapasdanga Purba Natunpara1 |
Plinth level |
-
latitude : 23.90714386,23.90707828
Longitude : 88.28433551,88.28426971
file name : Image_07012024144758588.png
|
2024-01-07 14:47:58.661657 |
506 |
57327336 |
Construction of concrete road from main road towards Azad house at Kapasdanga Purba Natunpara |
100000 |
Construction of concrete road from main road towards Azad house at Kapasdanga Purba Natunpara1 |
Completion of work |
-
latitude : 23.90713967,23.90714173
Longitude : 88.28432112,88.28432555
file name : Image_17122023124314966.png
|
2023-12-17 12:43:15.024567 |
507 |
57325482 |
Construction of concrete road from Tajel Biswas house towards ISDS center at Kapasdanga Purbapara Da |
100000 |
Construction of concrete road from Tajel Biswas house towards ISDS center at Kapasdanga Purbapara Da1 |
Roof laid |
-
latitude : 23.91150935,23.91148437
Longitude : 88.28384723,88.28385475
file name : Image_11012024131010194.png
|
2024-01-11 13:10:10.263079 |
508 |
57325482 |
Construction of concrete road from Tajel Biswas house towards ISDS center at Kapasdanga Purbapara Da |
100000 |
Construction of concrete road from Tajel Biswas house towards ISDS center at Kapasdanga Purbapara Da1 |
Plinth level |
-
latitude : 23.91148076,23.91147431
Longitude : 88.28391302,88.28391095
file name : Image_02012024170847259.png
|
2024-01-02 17:08:47.32602 |
509 |
57325482 |
Construction of concrete road from Tajel Biswas house towards ISDS center at Kapasdanga Purbapara Da |
100000 |
Construction of concrete road from Tajel Biswas house towards ISDS center at Kapasdanga Purbapara Da1 |
Completion of work |
-
latitude : 23.91152696,23.91152175
Longitude : 88.2839118,88.28390101
file name : Image_17122023124329081.png
|
2023-12-17 12:43:29.145123 |
510 |
57341658 |
Construction of concrete road from Sasthitala SSK center towards Jumar house at Kapasdanga Purbapara |
110000 |
Construction of concrete road from Sasthitala SSK center towards Jumar house at Kapasdanga Purbapara1 |
Roof laid |
-
latitude : 23.91398376,23.91398733
Longitude : 88.27661952,88.27661632
file name : Image_22012024163903119.png
|
2024-01-22 16:39:03.178405 |
511 |
57341658 |
Construction of concrete road from Sasthitala SSK center towards Jumar house at Kapasdanga Purbapara |
110000 |
Construction of concrete road from Sasthitala SSK center towards Jumar house at Kapasdanga Purbapara1 |
Plinth level |
-
latitude : 23.91406199,23.91405661
Longitude : 88.27659553,88.27659819
file name : Image_11012024130948970.png
|
2024-01-11 13:09:49.039394 |
512 |
57341658 |
Construction of concrete road from Sasthitala SSK center towards Jumar house at Kapasdanga Purbapara |
110000 |
Construction of concrete road from Sasthitala SSK center towards Jumar house at Kapasdanga Purbapara1 |
Completion of work |
-
latitude : 23.91401164,23.91401303
Longitude : 88.27661027,88.27662172
file name : Image_17122023124335506.png
|
2023-12-17 12:43:35.576909 |
513 |
57232993 |
Construction of concrete road from main road towards sahabul house at Nababbari Paschim |
140000 |
Construction of concrete road from main road towards sahabul house at Nababbari Paschim1 |
Roof laid |
-
latitude : 23.90147454,23.90147548
Longitude : 88.25144608,88.25146031
file name : Image_11012024120913261.png
|
2024-01-11 12:09:13.348875 |
514 |
57232993 |
Construction of concrete road from main road towards sahabul house at Nababbari Paschim |
140000 |
Construction of concrete road from main road towards sahabul house at Nababbari Paschim1 |
Plinth level |
-
latitude : 23.90145994,23.90146688,23.90146663
Longitude : 88.25151688,88.25153225,88.25150724
file name : Image_23122023134118501.png
|
2023-12-23 13:41:18.574303 |
515 |
57232993 |
Construction of concrete road from main road towards sahabul house at Nababbari Paschim |
140000 |
Construction of concrete road from main road towards sahabul house at Nababbari Paschim1 |
Completion of work |
-
latitude : 23.90147777,23.90148601,23.90148723
Longitude : 88.25158114,88.25156476,88.25155076
file name : Image_17122023124505205.png
|
2023-12-17 12:45:05.272735 |
516 |
57229771 |
Construction of concrete road from Ajit Mondal house towards Santi Mondal house at Hossainpur |
130000 |
Construction of concrete road from Ajit Mondal house towards Santi Mondal house at Hossainpur1 |
Plinth level |
-
latitude : 23.90953303,23.90952787
Longitude : 88.25495647,88.25497925
file name : Image_11012024120902968.png
|
2024-01-11 12:09:03.041193 |
517 |
57229771 |
Construction of concrete road from Ajit Mondal house towards Santi Mondal house at Hossainpur |
130000 |
Construction of concrete road from Ajit Mondal house towards Santi Mondal house at Hossainpur1 |
Plinth level |
-
latitude : 23.90956966,23.90954357
Longitude : 88.25496642,88.25496749
file name : Image_27122023155836068.png
|
2023-12-27 15:58:36.222294 |
518 |
57229771 |
Construction of concrete road from Ajit Mondal house towards Santi Mondal house at Hossainpur |
130000 |
Construction of concrete road from Ajit Mondal house towards Santi Mondal house at Hossainpur1 |
Completion of work |
-
latitude : 23.90954533,23.90955569
Longitude : 88.25495961,88.25495599
file name : Image_17122023124418457.png
|
2023-12-17 12:44:18.514318 |
519 |
57226649 |
Construction of concrete road from main road towards Laku house at Jitpur Dighirpara |
140000 |
Construction of concrete road from main road towards Laku house at Jitpur Dighirpara1 |
Roof laid |
-
latitude : 23.90283786,23.90283786,23.90283735
Longitude : 88.27423701,88.27423701,88.27425584
file name : Image_22012024162356717.png
|
2024-01-22 16:23:56.773645 |
520 |
57226649 |
Construction of concrete road from main road towards Laku house at Jitpur Dighirpara |
140000 |
Construction of concrete road from main road towards Laku house at Jitpur Dighirpara1 |
Plinth level |
-
latitude : 23.90277732,23.90277637
Longitude : 88.27439235,88.27439297
file name : Image_20012024100145673.png
|
2024-01-20 10:01:45.746263 |
521 |
57226649 |
Construction of concrete road from main road towards Laku house at Jitpur Dighirpara |
140000 |
Construction of concrete road from main road towards Laku house at Jitpur Dighirpara1 |
Completion of work |
-
latitude : 23.90282557,23.90281967
Longitude : 88.2741814,88.27414374
file name : Image_17122023124404168.png
|
2023-12-17 12:44:04.234192 |
522 |
57225514 |
Construction of concrete road from Kapasdanga bablatola Tufajul shop towards Usman house at Nowpuku |
120000 |
Construction of concrete road from Kapasdanga bablatola Tufajul shop towards Usman house at Nowpuku1 |
Roof laid |
-
latitude : 23.9119322,23.9119943
Longitude : 88.2732177,88.2735792
file name : Image_11012024120945849.png
|
2024-01-11 12:09:45.928621 |
523 |
57225514 |
Construction of concrete road from Kapasdanga bablatola Tufajul shop towards Usman house at Nowpuku |
120000 |
Construction of concrete road from Kapasdanga bablatola Tufajul shop towards Usman house at Nowpuku1 |
Plinth level |
-
latitude : 23.912004,23.9118381
Longitude : 88.2735078,88.2729787
file name : Image_25122023115232773.png
|
2023-12-25 11:52:32.289631 |
524 |
57225514 |
Construction of concrete road from Kapasdanga bablatola Tufajul shop towards Usman house at Nowpuku |
120000 |
Construction of concrete road from Kapasdanga bablatola Tufajul shop towards Usman house at Nowpuku1 |
Plinth level |
-
latitude : 23.912004,23.9118381
Longitude : 88.2735078,88.2729787
file name : Image_25122023115212006.png
|
2023-12-25 11:52:11.969174 |
525 |
57225514 |
Construction of concrete road from Kapasdanga bablatola Tufajul shop towards Usman house at Nowpuku |
120000 |
Construction of concrete road from Kapasdanga bablatola Tufajul shop towards Usman house at Nowpuku1 |
Completion of work |
-
latitude : 23.9117543,23.9118344
Longitude : 88.2730251,88.272984
file name : Image_17122023124412085.png
|
2023-12-17 12:44:12.148761 |
526 |
67538508 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.91326403
Longitude : 88.26393638
file name : Image_24092024154329690.png
|
2024-09-24 15:43:29.773981 |
527 |
67538508 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.9131898
Longitude : 88.2639721
file name : Image_11092024142516595.png
|
2024-09-11 14:25:16.677528 |
528 |
67538508 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.9131898
Longitude : 88.2639721
file name : Image_11092024142447444.png
|
2024-09-11 14:24:47.523765 |
529 |
67538508 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.9132307
Longitude : 88.26388178
file name : Image_25122023115147008.png
|
2023-12-25 11:51:47.078868 |
530 |
57228386 |
Construction of concrete road from main road towards Akkachh house at Jitpur Dighirpara |
105000 |
Construction of concrete road from main road towards Akkachh house at Jitpur Dighirpara1 |
Plinth level |
-
latitude : 23.9119394,23.9119394
Longitude : 88.2711082,88.2711082
file name : Image_06032024122443011.png
|
2024-03-06 12:24:43.083482 |
531 |
57228386 |
Construction of concrete road from main road towards Akkachh house at Jitpur Dighirpara |
105000 |
Construction of concrete road from main road towards Akkachh house at Jitpur Dighirpara1 |
Completion of work |
-
latitude : 23.9119235,23.8829356
Longitude : 88.2710857,88.247183
file name : Image_04032024125933595.png
|
2024-03-04 12:59:33.659683 |
532 |
89500725 |
Creation of drainage channel for management of grey water |
370000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.90217378
Longitude : 88.2750412
file name : Image_11092024142501763.png
|
2024-09-11 14:25:02.284326 |
533 |
89502193 |
Creation of drainage channel for management of grey water |
360000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.91399335
Longitude : 88.27529243
file name : Image_11092024094503886.png
|
2024-09-11 09:47:22.828723 |
534 |
89503144 |
Creation of drainage channel for management of grey water |
275000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.91225996
Longitude : 88.27951812
file name : Image_11092024091623290.png
|
2024-09-11 09:18:41.852464 |
535 |
89503354 |
Creation of drainage channel for management of grey water |
275000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.91252045
Longitude : 88.27951409
file name : Image_24092024140331686.png
|
2024-09-24 14:03:31.75742 |
536 |
89503354 |
Creation of drainage channel for management of grey water |
275000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.91251773
Longitude : 88.27955108
file name : Image_11092024091616942.png
|
2024-09-11 09:18:35.496591 |
537 |
89504255 |
Creation of drainage channel for management of grey water |
225000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.91244444
Longitude : 88.28376212
file name : Image_11092024091633283.png
|
2024-09-11 09:18:51.843637 |
538 |
97950159 |
Creation of drainage channel for management of grey water |
190000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.9117841
Longitude : 88.2710882
file name : Image_12092024154122518.png
|
2024-09-12 15:41:22.591123 |
539 |
97977270 |
Creation of a new source of drinking water |
1575000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.90509572
Longitude : 88.27520466
file name : Image_11092024094509478.png
|
2024-09-11 09:47:28.417869 |
540 |
89504486 |
Creation of drainage channel for management of grey water |
370000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.90812092
Longitude : 88.28539123
file name : Image_11092024091642958.png
|
2024-09-11 09:19:01.512828 |
541 |
67538597 |
Drainage Construction |
348000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.9119828
Longitude : 88.2736803
file name : Image_24062024154051336.png
|
2024-06-24 15:40:51.419717 |
542 |
67538597 |
Drainage Construction |
348000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.9120066
Longitude : 88.2735053
file name : Image_24062024151701830.png
|
2024-06-24 15:17:01.896286 |
543 |
67538597 |
Drainage Construction |
348000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.9119548
Longitude : 88.2735746
file name : Image_04022024085131823.png
|
2024-02-04 08:51:31.90099 |
544 |
67538597 |
Drainage Construction |
348000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.9119613
Longitude : 88.273696
file name : Image_30122023150937959.png
|
2023-12-30 15:09:38.03031 |
545 |
67539021 |
Drainage Construction |
350000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.9119362
Longitude : 88.285145
file name : Image_09072024160647994.png
|
2024-07-09 16:06:48.074662 |
546 |
67539021 |
Drainage Construction |
350000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.91196351
Longitude : 88.28481641
file name : Image_09072024155947746.png
|
2024-07-09 15:59:47.805515 |
547 |
67539021 |
Drainage Construction |
350000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.9119481
Longitude : 88.2851289
file name : Image_10022024101448515.png
|
2024-02-10 10:14:48.585763 |
548 |
67538807 |
Drainage Construction |
350000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.9126179
Longitude : 88.2868579
file name : Image_11072024144447743.png
|
2024-07-11 14:44:47.814615 |
549 |
67538807 |
Drainage Construction |
350000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.91241955
Longitude : 88.28715702
file name : Image_11072024095110758.png
|
2024-07-11 09:51:10.826213 |
550 |
67538807 |
Drainage Construction |
350000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.9138948
Longitude : 88.2787663
file name : Image_10022024101422925.png
|
2024-02-10 10:14:22.99576 |
551 |
67539176 |
Drainage Construction |
160000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.91169308
Longitude : 88.27101563
file name : Image_05092024114907808.png
|
2024-09-05 11:49:07.970654 |
552 |
67539176 |
Drainage Construction |
160000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.9156849
Longitude : 88.2554658
file name : Image_04092024130828738.png
|
2024-09-04 13:08:36.168491 |
553 |
67539176 |
Drainage Construction |
160000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.91113862
Longitude : 88.26015365
file name : Image_04082024200515651.png
|
2024-08-04 20:05:15.71363 |
554 |
75808054 |
Greywater management system |
1070000 |
Greywater management system1 |
Roof laid |
-
latitude : 23.9119748
Longitude : 88.2736386
file name : Image_11092024142506804.png
|
2024-09-11 14:25:06.882579 |
555 |
75808054 |
Greywater management system |
1070000 |
Greywater management system1 |
Roof laid |
-
latitude : 23.9119748
Longitude : 88.2736386
file name : Image_11092024142436183.png
|
2024-09-11 14:24:36.504743 |
556 |
75808054 |
Greywater management system |
1070000 |
Greywater management system1 |
Plinth level |
-
latitude : 23.9119602
Longitude : 88.273711
file name : Image_24082024114438260.png
|
2024-08-24 11:44:38.332612 |
557 |
75808054 |
Greywater management system |
1070000 |
Greywater management system1 |
Completion of work |
-
latitude : 23.9119466
Longitude : 88.2741473
file name : Image_04082024200442150.png
|
2024-08-04 20:04:42.219099 |
558 |
75809008 |
Greywater management system |
1070000 |
Greywater management system1 |
Roof laid |
-
latitude : 23.89915413
Longitude : 88.2503245
file name : Image_18092024141527689.png
|
2024-09-18 14:15:27.761623 |
559 |
75809008 |
Greywater management system |
1070000 |
Greywater management system1 |
Plinth level |
-
latitude : 23.8987959
Longitude : 88.2499097
file name : Image_11092024142513411.png
|
2024-09-11 14:25:13.493768 |
560 |
75809008 |
Greywater management system |
1070000 |
Greywater management system1 |
Plinth level |
-
latitude : 23.8987959
Longitude : 88.2499097
file name : Image_11092024142443943.png
|
2024-09-11 14:24:44.067072 |
561 |
75809008 |
Greywater management system |
1070000 |
Greywater management system1 |
Completion of work |
-
latitude : 23.91339033
Longitude : 88.26684156
file name : Image_04082024200504549.png
|
2024-08-04 20:05:04.615407 |
562 |
67622385 |
Drinking water facility |
1575000 |
Drinking water facility1 |
Roof laid |
-
latitude : 23.91177665
Longitude : 88.27104568
file name : Image_18092024141511317.png
|
2024-09-18 14:15:11.374073 |
563 |
67622385 |
Drinking water facility |
1575000 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.9119035
Longitude : 88.2711843
file name : Image_11092024142509929.png
|
2024-09-11 14:25:10.008403 |
564 |
67622385 |
Drinking water facility |
1575000 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.9119035
Longitude : 88.2711843
file name : Image_11092024142440094.png
|
2024-09-11 14:24:40.233005 |
565 |
67622385 |
Drinking water facility |
1575000 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.9121013
Longitude : 88.2709942
file name : Image_04082024200450698.png
|
2024-08-04 20:04:50.764836 |
566 |
67496713 |
Construction of roads |
170000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.90461929,23.90476541
Longitude : 88.25224707,88.25201057
file name : Image_04082024200523777.png
|
2024-08-04 20:05:23.841377 |
567 |
67495439 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.91259811,23.90611081,23.90611277
Longitude : 88.2759162,88.28122106,88.28122135
file name : Image_04082024161827896.png
|
2024-08-04 16:18:27.963873 |
568 |
67498984 |
Repairing/Construction of Building |
1700000 |
Repairing/Construction of Building1 |
Completion of work |
-
latitude : 23.9121018
Longitude : 88.2709972
file name : Image_04082024200459996.png
|
2024-08-04 20:05:00.06928 |
569 |
67498114 |
Construction of roads |
190000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.91279014,23.91278815
Longitude : 88.28746979,88.28751999
file name : Image_28082024112128008.png
|
2024-08-28 11:21:28.376282 |
570 |
67498114 |
Construction of roads |
190000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.91276366,23.91276349,23.91276209
Longitude : 88.28751263,88.28751696,88.28752406
file name : Image_24082024114409558.png
|
2024-08-24 11:44:09.631925 |
571 |
67498114 |
Construction of roads |
190000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.91282075,23.91282052
Longitude : 88.28752103,88.28753708
file name : Image_07082024085802722.png
|
2024-08-07 08:58:02.704216 |
572 |
89247425 |
Construction of roads |
270000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.91349032,23.91344306
Longitude : 88.26769209,88.26765011
file name : Image_05092024114914135.png
|
2024-09-05 11:49:14.221611 |
573 |
89247425 |
Construction of roads |
270000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.91234073,23.91337712
Longitude : 88.27737726,88.26774093
file name : Image_04092024130825115.png
|
2024-09-04 13:08:32.529325 |
574 |
89247425 |
Construction of roads |
270000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.91334904,23.91334452
Longitude : 88.26763147,88.2676418
file name : Image_15082024120007282.png
|
2024-08-15 12:00:07.34172 |
575 |
89378579 |
Construction of roads |
210000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.9101661,23.91070074
Longitude : 88.2856861,88.28563431
file name : Image_28082024113200704.png
|
2024-08-28 11:32:01.203407 |
576 |
89378579 |
Construction of roads |
210000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.9101659,23.9101659
Longitude : 88.2856873,88.2856873
file name : Image_28082024112136854.png
|
2024-08-28 11:21:37.210939 |
577 |
89378579 |
Construction of roads |
210000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.91118613,23.91080384
Longitude : 88.2856808,88.28563494
file name : Image_15082024115851862.png
|
2024-08-15 11:58:51.92496 |
578 |
89380034 |
Construction of roads |
380000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.91119324,23.91121713
Longitude : 88.28562472,88.28563098
file name : Image_28082024112132777.png
|
2024-08-28 11:21:33.157514 |
579 |
89380034 |
Construction of roads |
380000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.91123053,23.91122442
Longitude : 88.28602986,88.28603803
file name : Image_20082024162439803.png
|
2024-08-20 16:24:39.880336 |
580 |
89380034 |
Construction of roads |
380000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.9112095,23.91120764
Longitude : 88.2856454,88.28564877
file name : Image_15082024115843116.png
|
2024-08-15 11:58:43.177725 |
581 |
89379500 |
Construction of roads |
120000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.9123119,23.9123108
Longitude : 88.2840325,88.2840297
file name : Image_28082024112121652.png
|
2024-08-28 11:21:22.008482 |
582 |
89379500 |
Construction of roads |
120000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.9124765,23.91240942
Longitude : 88.28393557,88.28391276
file name : Image_22082024113149631.png
|
2024-08-22 11:31:49.716315 |
583 |
89379500 |
Construction of roads |
120000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.9101897,23.91259751
Longitude : 88.285684,88.27569577
file name : Image_21082024161721801.png
|
2024-08-21 16:17:21.919421 |
584 |
89379500 |
Construction of roads |
120000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.912414,23.912414
Longitude : 88.2838294,88.2838294
file name : Image_15082024115833211.png
|
2024-08-15 11:58:33.272 |
585 |
89376617 |
Construction of roads |
190000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.9056139,23.91245977,23.91245258
Longitude : 88.2809384,88.27584018,88.27584435
file name : Image_28082024105837703.png
|
2024-08-28 10:58:38.563333 |
586 |
89376617 |
Construction of roads |
190000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.9123144,23.9123144
Longitude : 88.2759939,88.2759939
file name : Image_24082024114419233.png
|
2024-08-24 11:44:19.32081 |
587 |
89376617 |
Construction of roads |
190000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.9120568,23.91244165
Longitude : 88.2737161,88.27585571
file name : Image_15082024115819283.png
|
2024-08-15 11:58:19.347249 |
588 |
89378166 |
Construction of roads |
240000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.91176418,23.91050076
Longitude : 88.27108202,88.27438709
file name : Image_30082024161100192.png
|
2024-08-30 16:11:00.411392 |
589 |
89378166 |
Construction of roads |
240000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.91053905,23.91048375
Longitude : 88.27438612,88.27437838
file name : Image_30082024143619121.png
|
2024-08-30 14:36:19.654772 |
590 |
89378166 |
Construction of roads |
240000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.91047357,23.9092439
Longitude : 88.27432026,88.27518
file name : Image_15082024115909817.png
|
2024-08-15 11:59:09.883884 |
591 |
89376448 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.9116636,23.9119493
Longitude : 88.27092762,88.2771473
file name : Image_12092024163907718.png
|
2024-09-12 16:39:07.799033 |
592 |
89376448 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.913388,23.91238429
Longitude : 88.2782024,88.27739164
file name : Image_31082024113756509.png
|
2024-08-31 11:37:57.081555 |
593 |
89376448 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.91306775,23.91310694,23.91311174
Longitude : 88.27524157,88.27523621,88.27524306
file name : Image_25082024134714176.png
|
2024-08-25 13:47:14.254793 |
594 |
89376448 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.91234646,23.91233041
Longitude : 88.27724559,88.27726512
file name : Image_15082024115826439.png
|
2024-08-15 11:58:26.503679 |
595 |
89376236 |
Construction of roads |
160000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.91308275,23.91310009
Longitude : 88.27533437,88.27530206
file name : Image_28082024123149265.png
|
2024-08-28 12:31:49.780556 |
596 |
89376236 |
Construction of roads |
160000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.91308275,23.91310009
Longitude : 88.27533437,88.27530206
file name : Image_28082024123134893.png
|
2024-08-28 12:31:35.376596 |
597 |
89376236 |
Construction of roads |
160000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.91272632,23.9130834
Longitude : 88.2753916,88.275221
file name : Image_28082024112047420.png
|
2024-08-28 11:20:47.674979 |
598 |
89376236 |
Construction of roads |
160000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.91307895,23.91307743
Longitude : 88.2752048,88.2752024
file name : Image_15082024115857401.png
|
2024-08-15 11:58:57.466173 |
599 |
89375850 |
Construction of roads |
140000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.91272668,23.912818
Longitude : 88.27274558,88.27278691
file name : Image_05092024114917473.png
|
2024-09-05 11:49:17.613196 |
600 |
89375850 |
Construction of roads |
140000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.91288115,23.9126467
Longitude : 88.27281617,88.2730072
file name : Image_28082024123128581.png
|
2024-08-28 12:31:29.055849 |
601 |
89375850 |
Construction of roads |
140000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.9126481,23.9126212
Longitude : 88.2730162,88.2730245
file name : Image_28082024123152335.png
|
2024-08-28 12:31:52.828031 |
602 |
89375850 |
Construction of roads |
140000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.91288115,23.9126467
Longitude : 88.27281617,88.2730072
file name : Image_28082024123142506.png
|
2024-08-28 12:31:42.987785 |
603 |
89375850 |
Construction of roads |
140000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.9126481,23.9126212
Longitude : 88.2730162,88.2730245
file name : Image_28082024123139134.png
|
2024-08-28 12:31:39.615411 |
604 |
89375850 |
Construction of roads |
140000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.91280232,23.9126405
Longitude : 88.27287946,88.2729799
file name : Image_15082024120137383.png
|
2024-08-15 12:01:37.445436 |
605 |
89374752 |
Construction of roads |
140000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.9000754,23.9000698
Longitude : 88.2503276,88.250332
file name : Image_07092024101109505.png
|
2024-09-07 10:12:12.031808 |
606 |
89374752 |
Construction of roads |
140000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.8999713,23.9000633
Longitude : 88.2503269,88.2503584
file name : Image_15082024120105408.png
|
2024-08-15 12:01:05.472004 |
607 |
89374173 |
Construction of roads |
240000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.9065952,23.906596
Longitude : 88.2518216,88.2518246
file name : Image_05092024114911045.png
|
2024-09-05 11:49:11.187036 |
608 |
89374173 |
Construction of roads |
240000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.9065966,23.9065966
Longitude : 88.2518288,88.2518288
file name : Image_04092024130832242.png
|
2024-09-04 13:08:39.659614 |
609 |
89374173 |
Construction of roads |
240000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.9065911,23.9065904
Longitude : 88.2518401,88.2518449
file name : Image_15082024120042542.png
|
2024-08-15 12:00:42.60553 |
610 |
89248143 |
Construction of roads |
160000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.9107184,23.9107205
Longitude : 88.267433,88.2674332
file name : Image_28082024123156679.png
|
2024-08-28 12:31:57.182618 |
611 |
89248143 |
Construction of roads |
160000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.9107184,23.9107205
Longitude : 88.267433,88.2674332
file name : Image_28082024123146213.png
|
2024-08-28 12:31:46.685183 |
612 |
89248143 |
Construction of roads |
160000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.91054674,23.9107123
Longitude : 88.26736168,88.2674092
file name : Image_21082024161652545.png
|
2024-08-21 16:16:52.703271 |
613 |
89248143 |
Construction of roads |
160000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.9117859,23.91068687
Longitude : 88.2678651,88.26735778
file name : Image_20082024140716125.png
|
2024-08-20 14:07:16.205564 |
614 |
89248143 |
Construction of roads |
160000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.9107138,23.9107138,23.91060546
Longitude : 88.2674082,88.2674082,88.2673349
file name : Image_15082024115930789.png
|
2024-08-15 11:59:30.8544 |
615 |
89371470 |
Construction of roads |
300000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.90823121,23.90822571
Longitude : 88.25385481,88.253855
file name : Image_15082024120031272.png
|
2024-08-15 12:00:31.342422 |
616 |
89371215 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.90935847,23.90936177
Longitude : 88.27443399,88.27442068
file name : Image_15082024115918955.png
|
2024-08-15 11:59:19.027417 |
617 |
67538445 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.9112887
Longitude : 88.27683927
file name : Image_22012024163858584.png
|
2024-01-22 16:38:58.639005 |
618 |
67538445 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.91130735
Longitude : 88.2768104
file name : Image_14012024122739581.png
|
2024-01-14 12:27:39.640344 |
619 |
67538445 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.91134236
Longitude : 88.27682809
file name : Image_11012024131056023.png
|
2024-01-11 13:10:56.095102 |
620 |
67538445 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.91132225
Longitude : 88.27683105
file name : Image_17122023124346729.png
|
2023-12-17 12:43:46.788484 |