1 |
34713209 |
Construction of pathway PCC road from Tilipara PMGSY road towards Dibakar Nandi House. |
148829 |
Construction of pathway PCC road from Tilipara PMGSY road towards Dibakar Nandi House.1 |
Plinth level |
-
latitude : 23.8891774,23.8891774
Longitude : 88.19189258333333,88.19189258333333
file name : Image_09032022160342623.png
|
2022-03-09 16:03:42.719017 |
2 |
34713209 |
Construction of pathway PCC road from Tilipara PMGSY road towards Dibakar Nandi House. |
148829 |
Construction of pathway PCC road from Tilipara PMGSY road towards Dibakar Nandi House.1 |
Completion of work |
-
latitude : 23.889012233333332,23.889012233333332
Longitude : 88.19187001666666,88.19187001666666
file name : Image_08032022104130756.png
|
2022-03-08 10:41:30.893472 |
3 |
39091002 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS |
301195 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS1 |
Completion of work |
-
latitude : 23.8891911
Longitude : 88.191814
file name : Image_25042022102459384.png
|
2022-04-25 10:24:59.492754 |
4 |
39091002 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS |
301195 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS1 |
Completion of work |
-
latitude : 23.883597366666663
Longitude : 88.20284131666668
file name : Image_26042022100951911.png
|
2022-04-26 10:09:52.002049 |
5 |
39091002 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS |
301195 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS1 |
Completion of work |
-
latitude : 23.883597366666663
Longitude : 88.20284131666668
file name : Image_26042022100918408.png
|
2022-04-26 10:09:18.503145 |
6 |
39091002 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS |
301195 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS2 |
Completion of work |
-
latitude : 23.8891887
Longitude : 88.1918159
file name : Image_26042022100844493.png
|
2022-04-26 10:08:44.578968 |
7 |
39091002 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS |
301195 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS1 |
Completion of work |
-
latitude : 23.889186
Longitude : 88.1918175
file name : Image_26042022100824517.png
|
2022-04-26 10:08:24.600213 |
8 |
39091002 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS |
301195 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS2 |
Completion of work |
-
latitude : 23.889186
Longitude : 88.1918175
file name : Image_26042022100805676.png
|
2022-04-26 10:08:05.763105 |
9 |
39091002 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS |
301195 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS1 |
Completion of work |
-
latitude : 23.8891923
Longitude : 88.1918184
file name : Image_25042022110456585.png
|
2022-04-25 11:04:56.667126 |
10 |
39091002 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS |
301195 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS1 |
Completion of work |
-
latitude : 23.8891923
Longitude : 88.1918184
file name : Image_25042022110507206.png
|
2022-04-25 11:05:07.294301 |
11 |
39091002 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS |
301195 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS1 |
Completion of work |
-
latitude : 23.8891923
Longitude : 88.1918184
file name : Image_25042022110450917.png
|
2022-04-25 11:04:50.977646 |
12 |
39091002 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS |
301195 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS1 |
Completion of work |
-
latitude : 23.8891923
Longitude : 88.1918184
file name : Image_25042022110501891.png
|
2022-04-25 11:05:01.97234 |
13 |
39091002 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS |
301195 |
PURCHASE OF VBD MATERIALS AND EQUIPMENTS1 |
Completion of work |
-
latitude : 23.8891911
Longitude : 88.191814
file name : Image_25042022110445416.png
|
2022-04-25 11:04:45.512808 |
14 |
34722482 |
Construction of pathway PCC road from Santoshpur cc road towards Yearul Sk house. |
100000 |
Construction of pathway PCC road from Santoshpur cc road towards Yearul Sk house.1 |
Plinth level |
-
latitude : 23.885313116666666,23.885313116666666
Longitude : 88.20183161666667,88.20183161666667
file name : Image_18062022095127529.png
|
2022-06-18 09:51:27.645112 |
15 |
34722482 |
Construction of pathway PCC road from Santoshpur cc road towards Yearul Sk house. |
100000 |
Construction of pathway PCC road from Santoshpur cc road towards Yearul Sk house.1 |
Completion of work |
-
latitude : 23.8891795,23.8891795
Longitude : 88.1918231,88.1918231
file name : Image_07062022102731639.png
|
2022-06-07 10:27:31.722609 |
16 |
34705206 |
Construction of pathway PCC road from Sekendarpur Nure Sk house towards Panchkari Sk house. |
99146 |
Construction of pathway PCC road from Sekendarpur Nure Sk house towards Panchkari Sk house.1 |
Plinth level |
-
latitude : 23.8891678,23.8891679
Longitude : 88.191823,88.1918231
file name : Image_20062022161610353.png
|
2022-06-20 16:16:10.455211 |
17 |
34705206 |
Construction of pathway PCC road from Sekendarpur Nure Sk house towards Panchkari Sk house. |
99146 |
Construction of pathway PCC road from Sekendarpur Nure Sk house towards Panchkari Sk house.1 |
Completion of work |
-
latitude : 23.925642700000004,23.925642700000004
Longitude : 88.19810076666666,88.19810076666666
file name : Image_10062022074636456.png
|
2022-06-10 07:46:36.574137 |
18 |
39090720 |
Construction of pathway PCC road at santoshpur Natnir mondala land towards ashram |
300000 |
Construction of pathway PCC road at santoshpur Natnir mondala land towards ashram1 |
Plinth level |
-
latitude : 23.885211766666664,23.885211766666664
Longitude : 88.20190003333333,88.20190003333333
file name : Image_21042022113244335.png
|
2022-04-21 11:32:44.444846 |
19 |
39090720 |
Construction of pathway PCC road at santoshpur Natnir mondala land towards ashram |
300000 |
Construction of pathway PCC road at santoshpur Natnir mondala land towards ashram1 |
Completion of work |
-
latitude : 23.866134666666667,23.866275850000005
Longitude : 88.21129103333332,88.21139434999999
file name : Image_24032022082702887.png
|
2022-03-24 08:27:02.98781 |
20 |
34667651 |
Construction of pathway PCC road from Prosadpur Nur Islam House towards the bank of Ganga. |
300000 |
Construction of pathway PCC road from Prosadpur Nur Islam House towards the bank of Ganga.1 |
Plinth level |
-
latitude : 23.867105016666663,23.8670433
Longitude : 88.21336828333332,88.2133331
file name : Image_23032022115915197.png
|
2022-03-23 11:59:15.312569 |
21 |
34667651 |
Construction of pathway PCC road from Prosadpur Nur Islam House towards the bank of Ganga. |
300000 |
Construction of pathway PCC road from Prosadpur Nur Islam House towards the bank of Ganga.1 |
Completion of work |
-
latitude : 23.9246284,23.867362249999996
Longitude : 88.19675158333332,88.21284543333334
file name : Image_13032022095548497.png
|
2022-03-13 09:55:48.618183 |
22 |
34741594 |
Construction of boundary Wall with Gate at Prosadpur Primary School. |
217177 |
Construction of boundary Wall with Gate at Prosadpur Primary School.1 |
Plinth level |
-
latitude : 23.869851250000004
Longitude : 88.21228021666666
file name : Image_11042022101810134.png
|
2022-04-11 10:18:10.243989 |
23 |
34741594 |
Construction of boundary Wall with Gate at Prosadpur Primary School. |
217177 |
Construction of boundary Wall with Gate at Prosadpur Primary School.1 |
Completion of work |
-
latitude : 23.901652483333336
Longitude : 88.18885401666667
file name : Image_11032022083343934.png
|
2022-03-11 08:33:44.043547 |
24 |
34741594 |
Construction of boundary Wall with Gate at Prosadpur Primary School. |
217177 |
Construction of boundary Wall with Gate at Prosadpur Primary School.1 |
Completion of work |
-
latitude : 23.901652483333336
Longitude : 88.18885401666667
file name : Image_11032022083413556.png
|
2022-03-11 08:34:13.651652 |
25 |
34761214 |
Construction of boundary wall at Nagar-Kaipara Sub Centre |
345464 |
Construction of boundary wall at Nagar-Kaipara Sub Centre1 |
Plinth level |
-
latitude : 23.91322093333333
Longitude : 88.19072696666666
file name : Image_11042022101902684.png
|
2022-04-11 10:19:02.800345 |
26 |
34761214 |
Construction of boundary wall at Nagar-Kaipara Sub Centre |
345464 |
Construction of boundary wall at Nagar-Kaipara Sub Centre1 |
Completion of work |
-
latitude : 23.913146466666664
Longitude : 88.19030980000001
file name : Image_05042022084939770.png
|
2022-04-05 08:49:39.893005 |
27 |
34721362 |
PCC road wth protecting wall frm Sekendarpur Holodhor Mondal house towards Sabdul Sk House |
300000 |
PCC road wth protecting wall frm Sekendarpur Holodhor Mondal house towards Sabdul Sk House 1 |
Plinth level |
-
latitude : 23.8823156,23.8823158
Longitude : 88.2019147,88.2019136
file name : Image_11042022160849399.png
|
2022-04-11 16:08:49.500357 |
28 |
34721362 |
PCC road wth protecting wall frm Sekendarpur Holodhor Mondal house towards Sabdul Sk House |
300000 |
PCC road wth protecting wall frm Sekendarpur Holodhor Mondal house towards Sabdul Sk House 1 |
Completion of work |
-
latitude : 23.88935466666667,23.88935466666667,23.88935466666667
Longitude : 88.19184353333334,88.19184353333334,88.19184353333334
file name : Image_05032022123708895.png
|
2022-03-05 12:37:09.0257 |
29 |
34712480 |
Construction of pathway PCC road from Kamnagar cc road towards Sufal Ghosh house. |
150027 |
Construction of pathway PCC road from Kamnagar cc road towards Sufal Ghosh house.1 |
Plinth level |
-
latitude : 23.920070216666666,23.920070216666666
Longitude : 88.19358089999999,88.19358089999999
file name : Image_21032022161529712.png
|
2022-03-21 16:15:29.808018 |
30 |
34712480 |
Construction of pathway PCC road from Kamnagar cc road towards Sufal Ghosh house. |
150027 |
Construction of pathway PCC road from Kamnagar cc road towards Sufal Ghosh house.1 |
Completion of work |
-
latitude : 23.889188966666666,23.889188966666666
Longitude : 88.19197706666667,88.19197706666667
file name : Image_10032022151115256.png
|
2022-03-10 15:11:15.342692 |
31 |
34700874 |
Construction of pathway PCC road from Alikpur cc road towards Hira Lal Mondal house. |
160353 |
Construction of pathway PCC road from Alikpur cc road towards Hira Lal Mondal house.1 |
Roof laid |
-
latitude : 23.8974004,23.8973964
Longitude : 88.1986105,88.1986134
file name : Image_08052023102334913.png
|
2023-05-08 10:23:35.004086 |
32 |
34700874 |
Construction of pathway PCC road from Alikpur cc road towards Hira Lal Mondal house. |
160353 |
Construction of pathway PCC road from Alikpur cc road towards Hira Lal Mondal house.1 |
Plinth level |
-
latitude : 23.897468049999997,23.897524649999998
Longitude : 88.19855616666668,88.19856271666667
file name : Image_07032022112720186.png
|
2022-03-07 11:27:20.302013 |
33 |
34700874 |
Construction of pathway PCC road from Alikpur cc road towards Hira Lal Mondal house. |
160353 |
Construction of pathway PCC road from Alikpur cc road towards Hira Lal Mondal house.1 |
Plinth level |
-
latitude : 23.897482716666666,23.897441650000005,23.897609400000004
Longitude : 88.19888955,88.19890993333333,88.19893713333335
file name : Image_07032022112913957.png
|
2022-03-07 11:29:14.054199 |
34 |
34700874 |
Construction of pathway PCC road from Alikpur cc road towards Hira Lal Mondal house. |
160353 |
Construction of pathway PCC road from Alikpur cc road towards Hira Lal Mondal house.1 |
Completion of work |
-
latitude : 23.88922761666667,23.88922761666667
Longitude : 88.19170423333335,88.19170423333335
file name : Image_25022022163551084.png
|
2022-02-25 16:35:51.160065 |
35 |
34667293 |
Construction of pathway PCC road from Nagar cc road towards Patit Mondal house. |
150692 |
Construction of pathway PCC road from Nagar cc road towards Patit Mondal house.1 |
Plinth level |
-
latitude : 23.9097397,23.90972356666667
Longitude : 88.19458525,88.19443371666667
file name : Image_26042022111455272.png
|
2022-04-26 11:14:55.36647 |
36 |
34667293 |
Construction of pathway PCC road from Nagar cc road towards Patit Mondal house. |
150692 |
Construction of pathway PCC road from Nagar cc road towards Patit Mondal house.1 |
Completion of work |
-
latitude : 23.920326999999997,23.920326999999997
Longitude : 88.19184781666667,88.19184781666667
file name : Image_05042022084504634.png
|
2022-04-05 08:45:04.761804 |
37 |
34666852 |
Construction of pathway PCC road from Nagar cc road towards Jhantu Biswas house. |
120418 |
Construction of pathway PCC road from Nagar cc road towards Jhantu Biswas house.1 |
Plinth level |
-
latitude : 23.919554283333333,23.910055933333336
Longitude : 88.19121828333333,88.19799091666667
file name : Image_04032022151154373.png
|
2022-03-04 15:11:54.500789 |
38 |
34666852 |
Construction of pathway PCC road from Nagar cc road towards Jhantu Biswas house. |
120418 |
Construction of pathway PCC road from Nagar cc road towards Jhantu Biswas house.1 |
Completion of work |
-
latitude : 23.909640399999997,23.9098404
Longitude : 88.19874101666667,88.1979899
file name : Image_25022022165657591.png
|
2022-02-25 16:56:57.672827 |
39 |
34666489 |
Construction of pathway PCC road from Mojlishpur cc road towards Satya Hazarika Land. |
300141 |
Construction of pathway PCC road from Mojlishpur cc road towards Satya Hazarika Land.1 |
Plinth level |
-
latitude : 23.883454766666667,23.883454766666667
Longitude : 88.20092551666667,88.20092551666667
file name : Image_11032022154056194.png
|
2022-03-11 15:40:56.309019 |
40 |
34666489 |
Construction of pathway PCC road from Mojlishpur cc road towards Satya Hazarika Land. |
300141 |
Construction of pathway PCC road from Mojlishpur cc road towards Satya Hazarika Land.1 |
Completion of work |
-
latitude : 23.9198773,23.9198773
Longitude : 88.19099346666665,88.19099346666665
file name : Image_04032022155553140.png
|
2022-03-04 15:55:53.256677 |
41 |
34710716 |
Construction of pathway PCC road from Dangapara CC road towards Shitaltala ICDS centre. |
200000 |
Construction of pathway PCC road from Dangapara CC road towards Shitaltala ICDS centre.1 |
Plinth level |
-
latitude : 23.885313116666666,23.885313116666666
Longitude : 88.20183161666667,88.20183161666667
file name : Image_12062022135935753.png
|
2022-06-12 13:59:35.867911 |
42 |
34710716 |
Construction of pathway PCC road from Dangapara CC road towards Shitaltala ICDS centre. |
200000 |
Construction of pathway PCC road from Dangapara CC road towards Shitaltala ICDS centre.1 |
Completion of work |
-
latitude : 23.8891795,23.889179
Longitude : 88.1918232,88.1918238
file name : Image_07062022104129659.png
|
2022-06-07 10:41:29.759623 |
43 |
34710716 |
Construction of pathway PCC road from Dangapara CC road towards Shitaltala ICDS centre. |
200000 |
Construction of pathway PCC road from Dangapara CC road towards Shitaltala ICDS centre.1 |
Completion of work |
-
latitude : 23.927332583333335,23.927332583333335
Longitude : 88.19752523333334,88.19752523333334
file name : Image_07062022110413644.png
|
2022-06-07 11:04:13.727466 |
44 |
34710716 |
Construction of pathway PCC road from Dangapara CC road towards Shitaltala ICDS centre. |
200000 |
Construction of pathway PCC road from Dangapara CC road towards Shitaltala ICDS centre.1 |
Completion of work |
-
latitude : 23.9273733,23.927327733333332
Longitude : 88.19830916666666,88.198278
file name : Image_07062022112719587.png
|
2022-06-07 11:27:19.675982 |
45 |
34709937 |
Construction of pathway PCC road from Tilipara PMGSY road towards Mritunjoy Dey house. |
100000 |
Construction of pathway PCC road from Tilipara PMGSY road towards Mritunjoy Dey house.1 |
Plinth level |
-
latitude : 23.92532041666667,23.925388916666666
Longitude : 88.19825643333334,88.19823286666666
file name : Image_07062022112307272.png
|
2022-06-07 11:23:07.379321 |
46 |
34708942 |
Construction of pathway PCC road from Moshimpur Bharat Ghosh house towards Rabi Sankar House. |
200000 |
Construction of pathway PCC road from Moshimpur Bharat Ghosh house towards Rabi Sankar House.1 |
Plinth level |
-
latitude : 23.8738931,23.8698951
Longitude : 88.2140948,88.2118793
file name : Image_05072022135232662.png
|
2022-07-05 13:52:32.77834 |
47 |
34708942 |
Construction of pathway PCC road from Moshimpur Bharat Ghosh house towards Rabi Sankar House. |
200000 |
Construction of pathway PCC road from Moshimpur Bharat Ghosh house towards Rabi Sankar House.1 |
Completion of work |
-
latitude : 23.8738985,23.8738985
Longitude : 88.2140915,88.2140915
file name : Image_24062022073612313.png
|
2022-06-24 07:36:12.3956 |
48 |
34706023 |
Construction of pathway PCC road from Mojlishpur RBCK road towards Bharat Saudagar house. |
150000 |
Construction of pathway PCC road from Mojlishpur RBCK road towards Bharat Saudagar house.1 |
Roof laid |
-
latitude : 23.8840458,23.8904494
Longitude : 88.2008471,88.1896476
file name : Image_04092022095559295.png
|
2022-09-04 09:55:59.408413 |
49 |
34706023 |
Construction of pathway PCC road from Mojlishpur RBCK road towards Bharat Saudagar house. |
150000 |
Construction of pathway PCC road from Mojlishpur RBCK road towards Bharat Saudagar house.1 |
Plinth level |
-
latitude : 23.889168,23.889168
Longitude : 88.1918233,88.1918233
file name : Image_20062022161606851.png
|
2022-06-20 16:16:06.932959 |
50 |
34706023 |
Construction of pathway PCC road from Mojlishpur RBCK road towards Bharat Saudagar house. |
150000 |
Construction of pathway PCC road from Mojlishpur RBCK road towards Bharat Saudagar house.1 |
Completion of work |
-
latitude : 23.88912626666667,23.88912626666667
Longitude : 88.19181625000002,88.19181625000002
file name : Image_12062022094909676.png
|
2022-06-12 09:49:09.793163 |
51 |
34771847 |
Construction of GP meeting room |
349532 |
Construction of GP meeting room1 |
Plinth level |
-
latitude : 23.8891913
Longitude : 88.1918217
file name : Image_22102022120915528.png
|
2022-10-22 12:09:15.658787 |
52 |
34771847 |
Construction of GP meeting room |
349532 |
Construction of GP meeting room1 |
Plinth level |
-
latitude : 23.8891793
Longitude : 88.1918137
file name : Image_12092022154132632.png
|
2022-09-12 15:41:32.727693 |
53 |
34771847 |
Construction of GP meeting room |
349532 |
Construction of GP meeting room1 |
Completion of work |
-
latitude : 23.8891775
Longitude : 88.1918051
file name : Image_12092022153833028.png
|
2022-09-12 15:38:33.126403 |
54 |
47385407 |
Construction of pathway PCC road from dhalai rasta towards uday nandi house at Tilipar-1 |
150000 |
Construction of pathway PCC road from dhalai rasta towards uday nandi house at Tilipar-11 |
Completion of work |
-
latitude : 23.9217184,23.923926166666668
Longitude : 88.19628226666667,88.19861010000001
file name : Image_20012023131616012.png
|
2023-01-20 13:16:16.104294 |
55 |
47378978 |
Construction of pathway PCC road from Santosh Mondal house towards Biswanath Mondal house at Saharba |
350000 |
Construction of pathway PCC road from Santosh Mondal house towards Biswanath Mondal house at Saharba1 |
Plinth level |
-
latitude : 23.902854516666668,23.90287418333333
Longitude : 88.19713255,88.19717495000002
file name : Image_28102022152105216.png
|
2022-10-28 15:21:05.338717 |
56 |
47378978 |
Construction of pathway PCC road from Santosh Mondal house towards Biswanath Mondal house at Saharba |
350000 |
Construction of pathway PCC road from Santosh Mondal house towards Biswanath Mondal house at Saharba1 |
Completion of work |
-
latitude : 23.895724233333333,23.895724233333333
Longitude : 88.19340235,88.19340235
file name : Image_22102022115020760.png
|
2022-10-22 11:50:20.892326 |
57 |
47380128 |
Construction of pathway PCC road from Rakhal Nandi house towards Primary School at Tilipara-1 |
350000 |
Construction of pathway PCC road from Rakhal Nandi house towards Primary School at Tilipara-11 |
Completion of work |
-
latitude : 23.929126283333336,23.929126283333336
Longitude : 88.19546748333332,88.19546748333332
file name : Image_04112022125110393.png
|
2022-11-04 12:51:10.494917 |
58 |
47380128 |
Construction of pathway PCC road from Rakhal Nandi house towards Primary School at Tilipara-1 |
350000 |
Construction of pathway PCC road from Rakhal Nandi house towards Primary School at Tilipara-11 |
Plinth level |
-
latitude : 23.9276485,23.929568616666664,23.929596616666664
Longitude : 88.1926937,88.19562841666666,88.1957421
file name : Image_14112022123425687.png
|
2022-11-14 12:34:25.790868 |
59 |
47385092 |
Construction of pathway PCC road from Majlishpur Dhalai rasta towards alikpur cc road via Biswakarm |
315000 |
Construction of pathway PCC road from Majlishpur Dhalai rasta towards alikpur cc road via Biswakarm1 |
Plinth level |
-
latitude : 23.895986333333333,23.895894833333333
Longitude : 88.19332018333334,88.19321681666666
file name : Image_28102022145840686.png
|
2022-10-28 14:58:40.83745 |
60 |
47385092 |
Construction of pathway PCC road from Majlishpur Dhalai rasta towards alikpur cc road via Biswakarm |
315000 |
Construction of pathway PCC road from Majlishpur Dhalai rasta towards alikpur cc road via Biswakarm1 |
Plinth level |
-
latitude : 23.895986333333333,23.895894833333333
Longitude : 88.19332018333334,88.19321681666666
file name : Image_28102022150140187.png
|
2022-10-28 15:01:40.291683 |
61 |
47385092 |
Construction of pathway PCC road from Majlishpur Dhalai rasta towards alikpur cc road via Biswakarm |
315000 |
Construction of pathway PCC road from Majlishpur Dhalai rasta towards alikpur cc road via Biswakarm1 |
Completion of work |
-
latitude : 23.9157316,23.895951550000003,23.895806816666664
Longitude : 88.1905614,88.19330191666668,88.19330478333335
file name : Image_22102022104342531.png
|
2022-10-22 10:43:42.615649 |
62 |
34665963 |
Construction of pathway PCC road from Taranagar Krishna Mondal house towards Bhomes Mondal house. |
338835 |
Construction of pathway PCC road from Taranagar Krishna Mondal house towards Bhomes Mondal house.1 |
Completion of work |
-
latitude : 23.869171033333334,23.869171033333334
Longitude : 88.21466809999998,88.21466809999998
file name : Image_19112022153934659.png
|
2022-11-19 15:39:34.77121 |
63 |
47371018 |
Construction of pathway PCC road with bamboo piling from Bablu sk house towards Filtar house at Pros |
225000 |
Construction of pathway PCC road with bamboo piling from Bablu sk house towards Filtar house at Pros1 |
Plinth level |
-
latitude : 23.869304866666667,23.86924285
Longitude : 88.21458851666667,88.21466854999998
file name : Image_04012023132807339.png
|
2023-01-04 13:28:07.461327 |
64 |
47371018 |
Construction of pathway PCC road with bamboo piling from Bablu sk house towards Filtar house at Pros |
225000 |
Construction of pathway PCC road with bamboo piling from Bablu sk house towards Filtar house at Pros1 |
Plinth level |
-
latitude : 23.8692209,23.869249449999998
Longitude : 88.21524045,88.21521338333332
file name : Image_22112022104908737.png
|
2022-11-22 10:49:08.847897 |
65 |
47371018 |
Construction of pathway PCC road with bamboo piling from Bablu sk house towards Filtar house at Pros |
225000 |
Construction of pathway PCC road with bamboo piling from Bablu sk house towards Filtar house at Pros1 |
Completion of work |
-
latitude : 23.8511078,23.86928756666667,23.869256683333333
Longitude : 88.2264912,88.21475885,88.21463898333334
file name : Image_18112022113948184.png
|
2022-11-18 11:39:48.300271 |
66 |
47376558 |
Construction of pathway PCC road from Dilip Mondal house towards Ramranjan Mondal house at Sekendarp |
200000 |
Construction of pathway PCC road from Dilip Mondal house towards Ramranjan Mondal house at Sekendarp1 |
Plinth level |
-
latitude : 23.8812168,23.881167566666665
Longitude : 88.2012468,88.20088341666666
file name : Image_22112022121808639.png
|
2022-11-22 12:18:09.104024 |
67 |
47376558 |
Construction of pathway PCC road from Dilip Mondal house towards Ramranjan Mondal house at Sekendarp |
200000 |
Construction of pathway PCC road from Dilip Mondal house towards Ramranjan Mondal house at Sekendarp1 |
Completion of work |
-
latitude : 23.889789933333336,23.889789933333336
Longitude : 88.19145056666666,88.19145056666666
file name : Image_29102022083621781.png
|
2022-10-29 08:36:21.884725 |
68 |
47383263 |
Construction of pathway PCC road from Haju sk house towards Ganj house at Sekendarpur. |
200000 |
Construction of pathway PCC road from Haju sk house towards Ganj house at Sekendarpur.1 |
Completion of work |
-
latitude : 23.88517891666667,23.88517891666667
Longitude : 88.20168826666668,88.20168826666668
file name : Image_21112022084514044.png
|
2022-11-21 08:45:14.152594 |
69 |
47371870 |
Construction of pathway PCC road from Majlishpur cc road towards Sukhen Mondal house |
200000 |
Construction of pathway PCC road from Majlishpur cc road towards Sukhen Mondal house1 |
Plinth level |
-
latitude : 23.9076383,23.907805233333338
Longitude : 88.19116430000001,88.19125700000001
file name : Image_23112022104658086.png
|
2022-11-23 10:46:58.194757 |
70 |
47371870 |
Construction of pathway PCC road from Majlishpur cc road towards Sukhen Mondal house |
200000 |
Construction of pathway PCC road from Majlishpur cc road towards Sukhen Mondal house1 |
Plinth level |
-
latitude : 23.907890716666664,23.907887566666666
Longitude : 88.19129328333332,88.19127019999999
file name : Image_23112022104702309.png
|
2022-11-23 10:47:02.415631 |
71 |
47371870 |
Construction of pathway PCC road from Majlishpur cc road towards Sukhen Mondal house |
200000 |
Construction of pathway PCC road from Majlishpur cc road towards Sukhen Mondal house1 |
Completion of work |
-
latitude : 23.9164784,23.9164784
Longitude : 88.1908661,88.1908661
file name : Image_21112022170135827.png
|
2022-11-21 17:01:35.924475 |
72 |
47378406 |
Construction of pathway PCC road from Nagar cc road towards Ardheswar Mondal house |
150000 |
Construction of pathway PCC road from Nagar cc road towards Ardheswar Mondal house1 |
Plinth level |
-
latitude : 23.89857553333333,23.89857553333333
Longitude : 88.20122328333333,88.20122328333333
file name : Image_02012023135327730.png
|
2023-01-02 13:53:27.84266 |
73 |
47378406 |
Construction of pathway PCC road from Nagar cc road towards Ardheswar Mondal house |
150000 |
Construction of pathway PCC road from Nagar cc road towards Ardheswar Mondal house1 |
Completion of work |
-
latitude : 23.89857553333333,23.89857553333333
Longitude : 88.20122328333333,88.20122328333333
file name : Image_29122022131325715.png
|
2022-12-29 13:13:25.819349 |
74 |
47385659 |
Construction of pathway PCC road from pmgsy road towards Bibhuti Kundus house at Tilipara-1 |
135000 |
Construction of pathway PCC road from pmgsy road towards Bibhuti Kundus house at Tilipara-1 1 |
Completion of work |
-
latitude : 23.889407633333335,23.889407633333335
Longitude : 88.19199591666666,88.19199591666666
file name : Image_25122022083220076.png
|
2022-12-25 08:32:20.171422 |
75 |
34701253 |
Construction of pathway PCC road from Alikpur cc road towards Habol Mondal House. |
124239 |
Construction of pathway PCC road from Alikpur cc road towards Habol Mondal House.1 |
Roof laid |
-
latitude : 23.897929533333333,23.897929533333333
Longitude : 88.20023701666666,88.20023701666666
file name : Image_08052023102019179.png
|
2023-05-08 10:20:19.287541 |
76 |
34701253 |
Construction of pathway PCC road from Alikpur cc road towards Habol Mondal House. |
124239 |
Construction of pathway PCC road from Alikpur cc road towards Habol Mondal House.1 |
Plinth level |
-
latitude : 23.897889366666664,23.89776611666667
Longitude : 88.20016070000001,88.20022263333334
file name : Image_12032022121142318.png
|
2022-03-12 12:11:42.407309 |
77 |
34701253 |
Construction of pathway PCC road from Alikpur cc road towards Habol Mondal House. |
124239 |
Construction of pathway PCC road from Alikpur cc road towards Habol Mondal House.1 |
Completion of work |
-
latitude : 23.897990699999998,23.897963100000002
Longitude : 88.20018103333332,88.20023908333333
file name : Image_07032022113404194.png
|
2022-03-07 11:34:04.309408 |
78 |
34730841 |
Construction of pathway PCC road from Mojlishpur Satya Hazarika land towards Tamal Biswas land. |
439197 |
Construction of pathway PCC road from Mojlishpur Satya Hazarika land towards Tamal Biswas land.1 |
Plinth level |
-
latitude : 23.885373716666663,23.885373716666663
Longitude : 88.20199470000001,88.20199470000001
file name : Image_27122022112744874.png
|
2022-12-27 11:27:45.001228 |
79 |
34730841 |
Construction of pathway PCC road from Mojlishpur Satya Hazarika land towards Tamal Biswas land. |
439197 |
Construction of pathway PCC road from Mojlishpur Satya Hazarika land towards Tamal Biswas land.1 |
Completion of work |
-
latitude : 23.889407633333335,23.889407633333335
Longitude : 88.19199591666666,88.19199591666666
file name : Image_27122022110005758.png
|
2022-12-27 11:00:05.902328 |
80 |
34707431 |
Construction of pathway PCC road from Mojlishpur RBCK road towards Dalim Mondal house. |
150027 |
Construction of pathway PCC road from Mojlishpur RBCK road towards Dalim Mondal house.1 |
Plinth level |
-
latitude : 23.893772433333332,23.893798783333335
Longitude : 88.18998841666668,88.19007106666668
file name : Image_17032022161956310.png
|
2022-03-17 16:19:56.408298 |
81 |
34707431 |
Construction of pathway PCC road from Mojlishpur RBCK road towards Dalim Mondal house. |
150027 |
Construction of pathway PCC road from Mojlishpur RBCK road towards Dalim Mondal house.1 |
Completion of work |
-
latitude : 23.8939657,23.89343613333333
Longitude : 88.1900175,88.19018990000001
file name : Image_09032022163952221.png
|
2022-03-09 16:39:52.316384 |
82 |
34742208 |
Construction of Boundary wall with gate at Majlishpur 148no ICDS centre |
122601 |
Construction of Boundary wall with gate at Majlishpur 148no ICDS centre1 |
Roof laid |
-
latitude : 23.901608000000003
Longitude : 88.18868535000001
file name : Image_08052023102934359.png
|
2023-05-08 10:29:34.455147 |
83 |
34742208 |
Construction of Boundary wall with gate at Majlishpur 148no ICDS centre |
122601 |
Construction of Boundary wall with gate at Majlishpur 148no ICDS centre1 |
Plinth level |
-
latitude : 23.90167215
Longitude : 88.18876891666666
file name : Image_30032022123733966.png
|
2022-03-30 12:37:34.063151 |
84 |
34742208 |
Construction of Boundary wall with gate at Majlishpur 148no ICDS centre |
122601 |
Construction of Boundary wall with gate at Majlishpur 148no ICDS centre1 |
Completion of work |
-
latitude : 23.901676883333334
Longitude : 88.1887874
file name : Image_10032022160723661.png
|
2022-03-10 16:07:23.752291 |
85 |
47384849 |
Construction of pathway PCC road from israfil house towards rezaul karim house at kazipara |
337752 |
Construction of pathway PCC road from israfil house towards rezaul karim house at kazipara1 |
Plinth level |
-
latitude : 23.89857553333333,23.89857553333333
Longitude : 88.20122328333333,88.20122328333333
file name : Image_02012023142128723.png
|
2023-01-02 14:21:28.805822 |
86 |
47384849 |
Construction of pathway PCC road from israfil house towards rezaul karim house at kazipara |
337752 |
Construction of pathway PCC road from israfil house towards rezaul karim house at kazipara1 |
Plinth level |
-
latitude : 23.91629706666667,23.91629706666667
Longitude : 88.1978685,88.1978685
file name : Image_20012023133259304.png
|
2023-01-20 13:32:59.407041 |
87 |
47384849 |
Construction of pathway PCC road from israfil house towards rezaul karim house at kazipara |
337752 |
Construction of pathway PCC road from israfil house towards rezaul karim house at kazipara1 |
Completion of work |
-
latitude : 23.89857553333333,23.89857553333333
Longitude : 88.20122328333333,88.20122328333333
file name : Image_29122022123842638.png
|
2022-12-29 12:38:42.740846 |
88 |
47375498 |
Construction of pathway PCC road from RBCK road towards Nur Md Sayed house at kazipara |
200000 |
Construction of pathway PCC road from RBCK road towards Nur Md Sayed house at kazipara1 |
Plinth level |
-
latitude : 23.8891912,23.8891909
Longitude : 88.1918145,88.1918164
file name : Image_14112022123945974.png
|
2022-11-14 12:39:46.087611 |
89 |
47375498 |
Construction of pathway PCC road from RBCK road towards Nur Md Sayed house at kazipara |
200000 |
Construction of pathway PCC road from RBCK road towards Nur Md Sayed house at kazipara1 |
Completion of work |
-
latitude : 23.898546800000002,23.898546800000002
Longitude : 88.20116871666666,88.20116871666666
file name : Image_04112022120226704.png
|
2022-11-04 12:02:26.775283 |
90 |
47376171 |
Construction of pathway PCC road from RBCK road towards Nurul Sk house at Kazipara |
200000 |
Construction of pathway PCC road from RBCK road towards Nurul Sk house at Kazipara1 |
Plinth level |
-
latitude : 23.8891915,23.8891921
Longitude : 88.1918178,88.1918183
file name : Image_14112022123949259.png
|
2022-11-14 12:39:49.367702 |
91 |
47376171 |
Construction of pathway PCC road from RBCK road towards Nurul Sk house at Kazipara |
200000 |
Construction of pathway PCC road from RBCK road towards Nurul Sk house at Kazipara1 |
Completion of work |
-
latitude : 23.914733066666667,23.914733066666667
Longitude : 88.19514615000001,88.19514615000001
file name : Image_04112022121017616.png
|
2022-11-04 12:10:17.697824 |
92 |
64244786 |
cons. of community sanitary complex convergence with MNB at Kazipara Bus Stand Kamnagar GP |
90000 |
cons. of community sanitary complex convergence with MNB at Kazipara Bus Stand Kamnagar GP1 |
Roof laid |
-
latitude : 23.921475083333334
Longitude : 88.19710773333333
file name : Image_15052023140634668.png
|
2023-05-15 14:06:34.773381 |
93 |
64244786 |
cons. of community sanitary complex convergence with MNB at Kazipara Bus Stand Kamnagar GP |
90000 |
cons. of community sanitary complex convergence with MNB at Kazipara Bus Stand Kamnagar GP1 |
Plinth level |
-
latitude : 23.885083983333335
Longitude : 88.20191503333332
file name : Image_02112022105220060.png
|
2022-11-02 10:52:20.211295 |
94 |
64244786 |
cons. of community sanitary complex convergence with MNB at Kazipara Bus Stand Kamnagar GP |
90000 |
cons. of community sanitary complex convergence with MNB at Kazipara Bus Stand Kamnagar GP1 |
Completion of work |
-
latitude : 23.91614123333333
Longitude : 88.19102616666666
file name : Image_26092022113004066.png
|
2022-09-26 11:30:04.171562 |
95 |
34665405 |
Construction of pathway PCC road from Kazipara Jortala towards Ananda biswas house. |
300438 |
Construction of pathway PCC road from Kazipara Jortala towards Ananda biswas house.1 |
Plinth level |
-
latitude : 23.919247000000002,23.919248533333334
Longitude : 88.19654466666667,88.19653261666666
file name : Image_10032022104458423.png
|
2022-03-10 10:44:58.552619 |
96 |
34665405 |
Construction of pathway PCC road from Kazipara Jortala towards Ananda biswas house. |
300438 |
Construction of pathway PCC road from Kazipara Jortala towards Ananda biswas house.1 |
Completion of work |
-
latitude : 23.909878983333336,23.909878983333336
Longitude : 88.19485701666666,88.19485701666666
file name : Image_25022022171450901.png
|
2022-02-25 17:14:51.021407 |
97 |
34708180 |
Construction of pathway PCC road from Kamnagar cc road towards Bipod Ghosh house. |
123570 |
Construction of pathway PCC road from Kamnagar cc road towards Bipod Ghosh house.1 |
Plinth level |
-
latitude : 23.889017516666666,23.889017516666666
Longitude : 88.19219464999999,88.19219464999999
file name : Image_18112022113456055.png
|
2022-11-18 11:34:56.164948 |
98 |
34708180 |
Construction of pathway PCC road from Kamnagar cc road towards Bipod Ghosh house. |
123570 |
Construction of pathway PCC road from Kamnagar cc road towards Bipod Ghosh house.1 |
Completion of work |
-
latitude : 23.921131683333336,23.921134900000002
Longitude : 88.19586393333333,88.19588373333333
file name : Image_04112022121827941.png
|
2022-11-04 12:18:28.02104 |
99 |
34715013 |
Construction of pathway PCC road from Kamnagar CC road towards Nepal Nandi house |
150000 |
Construction of pathway PCC road from Kamnagar CC road towards Nepal Nandi house1 |
Plinth level |
-
latitude : 23.8891679,23.8891679
Longitude : 88.1918231,88.1918231
file name : Image_20062022161216745.png
|
2022-06-20 16:12:16.851731 |
100 |
34715013 |
Construction of pathway PCC road from Kamnagar CC road towards Nepal Nandi house |
150000 |
Construction of pathway PCC road from Kamnagar CC road towards Nepal Nandi house1 |
Completion of work |
-
latitude : 23.9260935,23.92610715
Longitude : 88.19581760000001,88.19580808333333
file name : Image_07062022113430832.png
|
2022-06-07 11:34:30.940528 |
101 |
64244938 |
cons. community sanitary complex convergence with MNB at Prasadpur Tufan Sk House kamnagar GP |
90000 |
cons. community sanitary complex convergence with MNB at Prasadpur Tufan Sk House kamnagar GP1 |
Plinth level |
-
latitude : 23.86932093333333
Longitude : 88.21460808333335
file name : Image_04012023132237655.png
|
2023-01-04 13:22:37.796923 |
102 |
64244938 |
cons. community sanitary complex convergence with MNB at Prasadpur Tufan Sk House kamnagar GP |
90000 |
cons. community sanitary complex convergence with MNB at Prasadpur Tufan Sk House kamnagar GP1 |
Plinth level |
-
latitude : 23.869243266666665
Longitude : 88.21465876666667
file name : Image_18112022114052886.png
|
2022-11-18 11:40:52.990669 |
103 |
64244938 |
cons. community sanitary complex convergence with MNB at Prasadpur Tufan Sk House kamnagar GP |
90000 |
cons. community sanitary complex convergence with MNB at Prasadpur Tufan Sk House kamnagar GP1 |
Completion of work |
-
latitude : 23.889560666666664
Longitude : 88.19140098333334
file name : Image_14072022111612775.png
|
2022-07-14 11:16:12.859943 |
104 |
64245332 |
Cons. of community sanitary complex convergence with MNB at Alikpur Samsan Ghat Kamnagar GP |
90000 |
Cons. of community sanitary complex convergence with MNB at Alikpur Samsan Ghat Kamnagar GP1 |
Roof laid |
-
latitude : 23.87745011666667
Longitude : 88.19703248333332
file name : Image_15052023132223038.png
|
2023-05-15 13:22:23.161962 |
105 |
64245332 |
Cons. of community sanitary complex convergence with MNB at Alikpur Samsan Ghat Kamnagar GP |
90000 |
Cons. of community sanitary complex convergence with MNB at Alikpur Samsan Ghat Kamnagar GP1 |
Plinth level |
-
latitude : 23.885373716666663
Longitude : 88.20199470000001
file name : Image_27122022114236956.png
|
2022-12-27 11:42:37.064467 |
106 |
64245332 |
Cons. of community sanitary complex convergence with MNB at Alikpur Samsan Ghat Kamnagar GP |
90000 |
Cons. of community sanitary complex convergence with MNB at Alikpur Samsan Ghat Kamnagar GP1 |
Completion of work |
-
latitude : 23.885083983333335
Longitude : 88.20191503333332
file name : Image_04112022111809117.png
|
2022-11-04 11:18:09.190174 |
107 |
34668409 |
Construction of waiting shed at Alikpur Sasan Ghat. |
349980 |
Construction of waiting shed at Alikpur Sasan Ghat.1 |
Roof laid |
-
latitude : 23.89857553333333
Longitude : 88.20122328333333
file name : Image_27122022114523114.png
|
2022-12-27 11:45:23.232979 |
108 |
34668409 |
Construction of waiting shed at Alikpur Sasan Ghat. |
349980 |
Construction of waiting shed at Alikpur Sasan Ghat.1 |
Plinth level |
-
latitude : 23.898676216666665
Longitude : 88.20116511666666
file name : Image_16032022145512586.png
|
2022-03-16 14:55:12.701025 |
109 |
34668409 |
Construction of waiting shed at Alikpur Sasan Ghat. |
349980 |
Construction of waiting shed at Alikpur Sasan Ghat.1 |
Completion of work |
-
latitude : 23.898672083333334
Longitude : 88.20122885
file name : Image_12032022115908103.png
|
2022-03-12 11:59:08.219563 |
110 |
57857625 |
construction of cc road with road protecting wall from sekendarpur monosa mandir towards sadan das |
260000 |
construction of cc road with road protecting wall from sekendarpur monosa mandir towards sadan das 1 |
Completion of work |
-
latitude : 23.879572999999997,23.879551250000002,23.87953698333333
Longitude : 88.19844395,88.19842160000002,88.1984457
file name : Image_07042023085908997.png
|
2023-04-07 08:59:09.083898 |
111 |
57858354 |
construction of pcc road from moshimpur cc road towards sukumar ghosh house |
110000 |
construction of pcc road from moshimpur cc road towards sukumar ghosh house1 |
Roof laid |
-
latitude : 23.874684549999998,23.874684549999998
Longitude : 88.20940018333334,88.20940020000002
file name : Image_18042023141627320.png
|
2023-04-18 14:16:27.428561 |
112 |
57858354 |
construction of pcc road from moshimpur cc road towards sukumar ghosh house |
110000 |
construction of pcc road from moshimpur cc road towards sukumar ghosh house1 |
Roof laid |
-
latitude : 23.874684549999998,23.874684549999998
Longitude : 88.20940020000002,88.20940020000002
file name : Image_18042023141851632.png
|
2023-04-18 14:18:51.716946 |
113 |
57858354 |
construction of pcc road from moshimpur cc road towards sukumar ghosh house |
110000 |
construction of pcc road from moshimpur cc road towards sukumar ghosh house1 |
Plinth level |
-
latitude : 23.907025016666662,23.907025016666662
Longitude : 88.18921208333335,88.18921208333335
file name : Image_08042023104245841.png
|
2023-04-08 10:42:45.924678 |
114 |
57858354 |
construction of pcc road from moshimpur cc road towards sukumar ghosh house |
110000 |
construction of pcc road from moshimpur cc road towards sukumar ghosh house1 |
Completion of work |
-
latitude : 23.921428300000002,23.921428300000002
Longitude : 88.19696593333335,88.19696593333335
file name : Image_06042023112730931.png
|
2023-04-06 11:27:31.038354 |
115 |
34720852 |
PCC road wth prtctng wall frm Saru Bewa house to Faring Sk Grdn kazipara |
300000 |
PCC road wth prtctng wall frm Saru Bewa house to Faring Sk Grdn kazipara1 |
Completion of work |
-
latitude : 23.917144349999997,23.917144349999997
Longitude : 88.19742553333332,88.19742553333332
file name : Image_07042023093642532.png
|
2023-04-07 09:36:42.631917 |
116 |
57862020 |
cc road from prosadpur football field towards eidgaha maidan |
310000 |
cc road from prosadpur football field towards eidgaha maidan1 |
Roof laid |
-
latitude : 23.869124000000003,23.86911758333333
Longitude : 88.21574671666667,88.21571371666666
file name : Image_18042023143437093.png
|
2023-04-18 14:34:37.199897 |
117 |
57862020 |
cc road from prosadpur football field towards eidgaha maidan |
310000 |
cc road from prosadpur football field towards eidgaha maidan1 |
Plinth level |
-
latitude : 23.86900285,23.86899141666667
Longitude : 88.21598469999999,88.21607665000002
file name : Image_09042023100343595.png
|
2023-04-09 10:03:43.704819 |
118 |
57862020 |
cc road from prosadpur football field towards eidgaha maidan |
310000 |
cc road from prosadpur football field towards eidgaha maidan1 |
Completion of work |
-
latitude : 23.86925135,23.869253366666666
Longitude : 88.21575981666668,88.21574403333334
file name : Image_06042023113249578.png
|
2023-04-06 11:32:49.709128 |
119 |
57840688 |
construction of pcc road from majlishpur rbck road towards dipak mondal house |
160000 |
construction of pcc road from majlishpur rbck road towards dipak mondal house1 |
Roof laid |
-
latitude : 23.889057783333335,23.889057783333335
Longitude : 88.18842066666666,88.18842066666666
file name : Image_14042023092050335.png
|
2023-04-14 09:20:50.436583 |
120 |
57840688 |
construction of pcc road from majlishpur rbck road towards dipak mondal house |
160000 |
construction of pcc road from majlishpur rbck road towards dipak mondal house1 |
Plinth level |
-
latitude : 23.8689429,23.8689429
Longitude : 88.21644621666668,88.21644621666668
file name : Image_10042023102626851.png
|
2023-04-10 10:26:26.936535 |
121 |
57840688 |
construction of pcc road from majlishpur rbck road towards dipak mondal house |
160000 |
construction of pcc road from majlishpur rbck road towards dipak mondal house1 |
Plinth level |
-
latitude : 23.891800016666668,23.891810833333338
Longitude : 88.19021276666666,88.19022356666667
file name : Image_10042023102738111.png
|
2023-04-10 10:27:38.198379 |
122 |
57840688 |
construction of pcc road from majlishpur rbck road towards dipak mondal house |
160000 |
construction of pcc road from majlishpur rbck road towards dipak mondal house1 |
Completion of work |
-
latitude : 23.921428300000002,23.921428300000002
Longitude : 88.19696593333335,88.19696593333335
file name : Image_06042023101648070.png
|
2023-04-06 10:16:48.165275 |
123 |
57859193 |
construction of cc road from moshimpur kalitolatowards gaju das house |
115000 |
construction of cc road from moshimpur kalitolatowards gaju das house1 |
Roof laid |
-
latitude : 23.872604900000002,23.87400226666667
Longitude : 88.21541056666668,88.21069805
file name : Image_18042023142405703.png
|
2023-04-18 14:24:05.78195 |
124 |
57859193 |
construction of cc road from moshimpur kalitolatowards gaju das house |
115000 |
construction of cc road from moshimpur kalitolatowards gaju das house1 |
Plinth level |
-
latitude : 23.919002816666662,23.919002816666662
Longitude : 88.19174745000001,88.19174745000001
file name : Image_11042023115957501.png
|
2023-04-11 11:59:57.609952 |
125 |
57859193 |
construction of cc road from moshimpur kalitolatowards gaju das house |
115000 |
construction of cc road from moshimpur kalitolatowards gaju das house1 |
Completion of work |
-
latitude : 23.88940158333333,23.88940158333333
Longitude : 88.19168431666667,88.19168431666667
file name : Image_07042023084708405.png
|
2023-04-07 08:47:08.488989 |
126 |
57860479 |
construction of pcc road from pmgsy road towards apple sekh house |
70000 |
construction of pcc road from pmgsy road towards apple sekh house1 |
Roof laid |
-
latitude : 23.87476778333333,23.87476778333333
Longitude : 88.19798115,88.19798115
file name : Image_18042023145120817.png
|
2023-04-18 14:51:20.904918 |
127 |
57860479 |
construction of pcc road from pmgsy road towards apple sekh house |
70000 |
construction of pcc road from pmgsy road towards apple sekh house1 |
Plinth level |
-
latitude : 23.919002816666662,23.919002816666662
Longitude : 88.19174745000001,88.19174745000001
file name : Image_12042023122337252.png
|
2023-04-12 12:23:37.38167 |
128 |
57860479 |
construction of pcc road from pmgsy road towards apple sekh house |
70000 |
construction of pcc road from pmgsy road towards apple sekh house1 |
Completion of work |
-
latitude : 23.87460521666667,23.87480701666667
Longitude : 88.19762614999999,88.19753558333332
file name : Image_07042023090012956.png
|
2023-04-07 09:00:13.047151 |
129 |
64245176 |
cons. of community sanitary complex convergence with MNB at Santoshpur Ambia Sk Shop |
90000 |
cons. of community sanitary complex convergence with MNB at Santoshpur Ambia Sk Shop 1 |
Plinth level |
-
latitude : 23.86684161666667
Longitude : 88.20711121666666
file name : Image_30052023123756027.png
|
2023-05-30 12:37:56.147264 |
130 |
64245176 |
cons. of community sanitary complex convergence with MNB at Santoshpur Ambia Sk Shop |
90000 |
cons. of community sanitary complex convergence with MNB at Santoshpur Ambia Sk Shop 1 |
Completion of work |
-
latitude : 23.885083983333335
Longitude : 88.20191503333332
file name : Image_02112022121154189.png
|
2022-11-02 12:11:54.269325 |
131 |
67304051 |
Creation of drainage channel for management of grey water |
110000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.924586433333335
Longitude : 88.19895446666666
file name : Image_22042023075458014.png
|
2023-04-22 07:54:58.108475 |
132 |
67304511 |
Creation of drainage channel for management of grey water |
120000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.8841226
Longitude : 88.20122248333334
file name : Image_06062023113152131.png
|
2023-06-06 11:31:52.214254 |
133 |
67304511 |
Creation of drainage channel for management of grey water |
120000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.925502166666668
Longitude : 88.19758393333335
file name : Image_22042023075812028.png
|
2023-04-22 07:58:12.112826 |
134 |
67304584 |
Creation of drainage channel for management of grey water |
130000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.9252206
Longitude : 88.1962044
file name : Image_22042023080057555.png
|
2023-04-22 08:00:57.640332 |
135 |
67304711 |
Creation of drainage channel for management of grey water |
135000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.873180466666668
Longitude : 88.21283331666667
file name : Image_22042023074503982.png
|
2023-04-22 07:45:04.067017 |
136 |
67305185 |
Creation of drainage channel for management of grey water |
240000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.87237611666667
Longitude : 88.20026583333335
file name : Image_06032024105318562.png
|
2024-03-06 10:53:18.648478 |
137 |
67305185 |
Creation of drainage channel for management of grey water |
240000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.924150083333334
Longitude : 88.19658608333333
file name : Image_22042023080643719.png
|
2023-04-22 08:06:43.79619 |
138 |
67305386 |
Creation of drainage channel for management of grey water |
110000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.901761133333334
Longitude : 88.18872345
file name : Image_22042023084306186.png
|
2023-04-22 08:43:06.265556 |
139 |
67305593 |
Creation of drainage channel for management of grey water |
160000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.909623450000005
Longitude : 88.19663671666667
file name : Image_22042023082616467.png
|
2023-04-22 08:26:16.5527 |
140 |
67305880 |
Creation of drainage channel for management of grey water |
110000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.86685775
Longitude : 88.20726238333333
file name : Image_30052023123803206.png
|
2023-05-30 12:38:03.284705 |
141 |
67305880 |
Creation of drainage channel for management of grey water |
110000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.86685775
Longitude : 88.20726238333333
file name : Image_30052023123759382.png
|
2023-05-30 12:37:59.467406 |
142 |
67305880 |
Creation of drainage channel for management of grey water |
110000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.89187323333333
Longitude : 88.19043026666668
file name : Image_26042023144316159.png
|
2023-04-26 14:43:16.332745 |
143 |
67305880 |
Creation of drainage channel for management of grey water |
110000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.89187323333333
Longitude : 88.19043026666668
file name : Image_26042023144346356.png
|
2023-04-26 14:43:46.46565 |
144 |
67305880 |
Creation of drainage channel for management of grey water |
110000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.866915166666665
Longitude : 88.20731045
file name : Image_20042023091613739.png
|
2023-04-20 09:16:13.814917 |
145 |
67305756 |
Creation of drainage channel for management of grey water |
160000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.882864
Longitude : 88.2019988
file name : Image_20042023085827250.png
|
2023-04-20 08:58:27.326529 |
146 |
67305832 |
Creation of drainage channel for management of grey water |
80000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.90957348333333
Longitude : 88.18974891666667
file name : Image_04052023131933566.png
|
2023-05-04 13:19:33.651587 |
147 |
67304940 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.889141866666666
Longitude : 88.19183843333333
file name : Image_04052023121300615.png
|
2023-05-04 12:13:00.732277 |
148 |
67304940 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.9147486
Longitude : 88.1971023
file name : Image_04052023121007420.png
|
2023-05-04 12:10:07.522113 |
149 |
67304422 |
Creation of drainage channel for management of grey water |
101000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.910145249999996
Longitude : 88.19356101666666
file name : Image_22042023083012290.png
|
2023-04-22 08:30:12.388228 |
150 |
67305517 |
Creation of drainage channel for management of grey water |
120000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.909933900000002
Longitude : 88.19337353333334
file name : Image_22052023123827403.png
|
2023-05-22 12:38:27.52269 |
151 |
67305517 |
Creation of drainage channel for management of grey water |
120000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.909857083333335
Longitude : 88.19371536666668
file name : Image_08052023103841181.png
|
2023-05-08 10:38:41.276455 |
152 |
57853302 |
construction of pcc road from majlishpur rabindranth house to nimai biswas hosue |
210000 |
construction of pcc road from majlishpur rabindranth house to nimai biswas hosue1 |
Roof laid |
-
latitude : 23.89395116666667,23.893913566666665
Longitude : 88.18985810000001,88.18987913333333
file name : Image_10052023104200596.png
|
2023-05-10 10:42:00.693832 |
153 |
57853302 |
construction of pcc road from majlishpur rabindranth house to nimai biswas hosue |
210000 |
construction of pcc road from majlishpur rabindranth house to nimai biswas hosue1 |
Roof laid |
-
latitude : 23.89397095,23.893955283333337
Longitude : 88.18982091666666,88.18985794999999
file name : Image_10052023104721174.png
|
2023-05-10 10:47:21.265273 |
154 |
57853302 |
construction of pcc road from majlishpur rabindranth house to nimai biswas hosue |
210000 |
construction of pcc road from majlishpur rabindranth house to nimai biswas hosue1 |
Plinth level |
-
latitude : 23.889110616666667,23.889110616666667
Longitude : 88.19196181666666,88.19196181666666
file name : Image_10052023102131071.png
|
2023-05-10 10:21:31.166017 |
155 |
57853302 |
construction of pcc road from majlishpur rabindranth house to nimai biswas hosue |
210000 |
construction of pcc road from majlishpur rabindranth house to nimai biswas hosue1 |
Completion of work |
-
latitude : 23.893907483333336,23.8938882
Longitude : 88.18985728333334,88.18985763333333
file name : Image_26042023144303685.png
|
2023-04-26 14:43:03.830392 |
156 |
67304239 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.88920025
Longitude : 88.19179016666666
file name : Image_22052023120739761.png
|
2023-05-22 12:07:39.857974 |
157 |
67304239 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.923559916666665
Longitude : 88.19670141666666
file name : Image_08052023104805783.png
|
2023-05-08 10:48:05.892118 |
158 |
67304286 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.9214904
Longitude : 88.1970888
file name : Image_08052023104452284.png
|
2023-05-08 10:44:52.424266 |
159 |
67305261 |
Creation of drainage channel for management of grey water |
400000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.926336633333335
Longitude : 88.19831888333334
file name : Image_08052023105232683.png
|
2023-05-08 10:52:32.787734 |
160 |
67305446 |
Creation of drainage channel for management of grey water |
110000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.9054454
Longitude : 88.18906546666668
file name : Image_22052023125903597.png
|
2023-05-22 12:59:03.701948 |
161 |
67305446 |
Creation of drainage channel for management of grey water |
110000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.90524601666667
Longitude : 88.18993941666668
file name : Image_08052023110425249.png
|
2023-05-08 11:04:25.361022 |
162 |
67305446 |
Creation of drainage channel for management of grey water |
110000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.905243249999998
Longitude : 88.1898434
file name : Image_22042023083801042.png
|
2023-04-22 08:38:01.13296 |
163 |
67305671 |
Creation of drainage channel for management of grey water |
135000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.867786383333335
Longitude : 88.21182240000002
file name : Image_22052023134407874.png
|
2023-05-22 13:44:07.965001 |
164 |
67305671 |
Creation of drainage channel for management of grey water |
135000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.866915166666665
Longitude : 88.20731045
file name : Image_20042023092411571.png
|
2023-04-20 09:24:11.648035 |
165 |
67305009 |
Creation of drainage channel for management of grey water |
120000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.91234345
Longitude : 88.19822735000001
file name : Image_22052023122909707.png
|
2023-05-22 12:29:09.804507 |
166 |
67305009 |
Creation of drainage channel for management of grey water |
120000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.913303133333336
Longitude : 88.19807154999998
file name : Image_15052023134940975.png
|
2023-05-15 13:49:41.087597 |
167 |
67305009 |
Creation of drainage channel for management of grey water |
120000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.889141866666666
Longitude : 88.19183843333333
file name : Image_04052023114726023.png
|
2023-05-04 11:47:26.121317 |
168 |
67304344 |
Creation of drainage channel for management of grey water |
120000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.916695316666665
Longitude : 88.1978306
file name : Image_22052023121701503.png
|
2023-05-22 12:17:01.599845 |
169 |
67304344 |
Creation of drainage channel for management of grey water |
120000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.91672971666667
Longitude : 88.19775571666666
file name : Image_15052023135208908.png
|
2023-05-15 13:52:09.003082 |
170 |
67304344 |
Creation of drainage channel for management of grey water |
120000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.889141866666666
Longitude : 88.19183843333333
file name : Image_04052023113819820.png
|
2023-05-04 11:38:19.934545 |
171 |
67305315 |
Creation of drainage channel for management of grey water |
170000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.905300049999997
Longitude : 88.19023306666668
file name : Image_22052023134400807.png
|
2023-05-22 13:44:00.897485 |
172 |
67305315 |
Creation of drainage channel for management of grey water |
170000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.898386833333333
Longitude : 88.2011659
file name : Image_15052023132427036.png
|
2023-05-15 13:24:27.128579 |
173 |
67305315 |
Creation of drainage channel for management of grey water |
170000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.898529583333335
Longitude : 88.20118948333332
file name : Image_08052023101218129.png
|
2023-05-08 10:12:18.226149 |
174 |
64245459 |
cons. of community sanitary complex convergence with MNB nagar bridge Kamnagar GP |
90000 |
cons. of community sanitary complex convergence with MNB nagar bridge Kamnagar GP1 |
Plinth level |
-
latitude : 23.9097817
Longitude : 88.189903
file name : Image_07062023104030357.png
|
2023-06-07 10:40:30.467862 |
175 |
64245459 |
cons. of community sanitary complex convergence with MNB nagar bridge Kamnagar GP |
90000 |
cons. of community sanitary complex convergence with MNB nagar bridge Kamnagar GP1 |
Completion of work |
-
latitude : 23.9097346
Longitude : 88.1897371
file name : Image_15052023133538436.png
|
2023-05-15 13:35:38.535118 |
176 |
64244578 |
Cons. of Community Sanitary Complex Convergence with (MNB) at Kamnagar Deshbandhu Club Kamnagar GP |
90000 |
Cons. of Community Sanitary Complex Convergence with (MNB) at Kamnagar Deshbandhu Club Kamnagar GP1 |
Plinth level |
-
latitude : 23.889063333333336
Longitude : 88.19185871666666
file name : Image_27032023153310649.png
|
2023-03-27 15:33:10.745058 |
177 |
64244578 |
Cons. of Community Sanitary Complex Convergence with (MNB) at Kamnagar Deshbandhu Club Kamnagar GP |
90000 |
Cons. of Community Sanitary Complex Convergence with (MNB) at Kamnagar Deshbandhu Club Kamnagar GP1 |
Completion of work |
-
latitude : 23.9227317
Longitude : 88.1969082
file name : Image_13012023140347349.png
|
2023-01-13 14:03:47.464679 |
178 |
47252973 |
water treatment plant |
1700000 |
water treatment plant1 |
Completion of work |
-
latitude : 23.883576416666664
Longitude : 88.2011886
file name : Image_10122022093018224.png
|
2022-12-10 09:30:18.324274 |
179 |
47252517 |
water treatment plant |
1550598 |
water treatment plant1 |
Completion of work |
-
latitude : 23.923914283333335
Longitude : 88.19864346666667
file name : Image_20012023132516833.png
|
2023-01-20 13:25:16.929514 |
180 |
47246718 |
water treatment plant |
1600000 |
water treatment plant1 |
Plinth level |
-
latitude : 23.89857553333333
Longitude : 88.20122328333333
file name : Image_29122022131558096.png
|
2022-12-29 13:15:58.290769 |
181 |
47246718 |
water treatment plant |
1600000 |
water treatment plant1 |
Completion of work |
-
latitude : 23.909790083333338
Longitude : 88.1974143
file name : Image_12122022103005730.png
|
2022-12-12 10:30:05.831606 |
182 |
34734911 |
Arsenic Free water Treatment Plant at Santoshpur Eid Gah Maidan |
1700000 |
Arsenic Free water Treatment Plant at Santoshpur Eid Gah Maidan 1 |
Plinth level |
-
latitude : 23.86966515
Longitude : 88.20493126666666
file name : Image_30112021084500926.png
|
2021-11-30 08:45:01.048478 |
183 |
34734911 |
Arsenic Free water Treatment Plant at Santoshpur Eid Gah Maidan |
1700000 |
Arsenic Free water Treatment Plant at Santoshpur Eid Gah Maidan 1 |
Completion of work |
-
latitude : 23.869696666666663
Longitude : 88.20495185
file name : Image_05092021115131740.png
|
2021-09-05 11:51:31.842851 |
184 |
34734911 |
Arsenic Free water Treatment Plant at Santoshpur Eid Gah Maidan |
1700000 |
Arsenic Free water Treatment Plant at Santoshpur Eid Gah Maidan 1 |
Completion of work |
-
latitude : 23.869708216666663
Longitude : 88.20491031666667
file name : Image_05092021115234927.png
|
2021-09-05 11:52:35.029692 |
185 |
57863514 |
construction of culvert near tilipara at vetultala |
1700000 |
construction of culvert near tilipara at vetultala1 |
Plinth level |
-
latitude : 23.889111133333337,23.889111133333337
Longitude : 88.19191833333335,88.19191833333335
file name : Image_01062023130242366.png
|
2023-06-01 13:02:42.457083 |
186 |
57863514 |
construction of culvert near tilipara at vetultala |
1700000 |
construction of culvert near tilipara at vetultala1 |
Plinth level |
-
latitude : 23.889111133333337,23.889111133333337
Longitude : 88.19191833333335,88.19191833333335
file name : Image_01062023130330830.png
|
2023-06-01 13:03:30.925752 |
187 |
57863514 |
construction of culvert near tilipara at vetultala |
1700000 |
construction of culvert near tilipara at vetultala1 |
Plinth level |
-
latitude : 23.92595061666667,23.925981250000003
Longitude : 88.17752473333333,88.17756059999998
file name : Image_01062023130515192.png
|
2023-06-01 13:05:15.295448 |
188 |
57863514 |
construction of culvert near tilipara at vetultala |
1700000 |
construction of culvert near tilipara at vetultala1 |
Completion of work |
-
latitude : 23.889141866666666,23.889141866666666
Longitude : 88.19183843333333,88.19183843333333
file name : Image_03052023105659773.png
|
2023-05-03 10:56:59.871624 |
189 |
57862864 |
construction of culvert near sanatan pal land at tilipara |
1700000 |
construction of culvert near sanatan pal land at tilipara1 |
Plinth level |
-
latitude : 23.889111133333337,23.92585993333333
Longitude : 88.19191833333335,88.1778371
file name : Image_01062023130300767.png
|
2023-06-01 13:03:00.882612 |
190 |
57862864 |
construction of culvert near sanatan pal land at tilipara |
1700000 |
construction of culvert near sanatan pal land at tilipara1 |
Plinth level |
-
latitude : 23.92587263333333,23.925883233333334
Longitude : 88.17770941666667,88.1777969
file name : Image_01062023130529046.png
|
2023-06-01 13:05:29.156392 |
191 |
57862864 |
construction of culvert near sanatan pal land at tilipara |
1700000 |
construction of culvert near sanatan pal land at tilipara1 |
Plinth level |
-
latitude : 23.92587263333333,23.925883233333334
Longitude : 88.17770941666667,88.1777969
file name : Image_01062023130555765.png
|
2023-06-01 13:05:55.855101 |
192 |
57862864 |
construction of culvert near sanatan pal land at tilipara |
1700000 |
construction of culvert near sanatan pal land at tilipara1 |
Completion of work |
-
latitude : 23.889141866666666,23.889141866666666
Longitude : 88.19183843333333,88.19183843333333
file name : Image_03052023105533873.png
|
2023-05-03 10:55:33.962423 |
193 |
87491563 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.914540483333333
Longitude : 88.19686188333331
file name : Image_11012024162447081.png
|
2024-01-11 16:24:47.182754 |
194 |
87491245 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.898259900000003
Longitude : 88.18810883333332
file name : Image_30012024111252510.png
|
2024-01-30 11:12:52.60417 |
195 |
87491820 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.871205083333333
Longitude : 88.21366728333332
file name : Image_11012024142202781.png
|
2024-01-11 14:22:02.862372 |
196 |
87491820 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.871273883333334
Longitude : 88.21370290000002
file name : Image_11012024140824631.png
|
2024-01-11 14:08:24.70772 |
197 |
87492040 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.898876133333335
Longitude : 88.18841436666668
file name : Image_30012024110818400.png
|
2024-01-30 11:08:18.502158 |
198 |
87491854 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.879000816666668
Longitude : 88.20233623333334
file name : Image_30012024114123275.png
|
2024-01-30 11:41:23.371759 |
199 |
87491854 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.880095700000002
Longitude : 88.20161743333334
file name : Image_11012024134605518.png
|
2024-01-11 13:46:05.596704 |
200 |
87491854 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.88102041666667
Longitude : 88.20176971666666
file name : Image_11012024133442717.png
|
2024-01-11 13:34:42.805624 |
201 |
87491963 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.869152216666667
Longitude : 88.21577025
file name : Image_11012024140416194.png
|
2024-01-11 14:04:16.275728 |
202 |
87491963 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.86917526666667
Longitude : 88.21572256666668
file name : Image_11012024135536755.png
|
2024-01-11 13:55:36.860762 |
203 |
87491727 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.882919583333333
Longitude : 88.20927791666666
file name : Image_11012024120900678.png
|
2024-01-11 12:09:00.766115 |
204 |
87491444 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.88230006666667
Longitude : 88.21018011666665
file name : Image_11012024093520255.png
|
2024-01-11 09:35:20.342716 |
205 |
87491923 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.878475666666667
Longitude : 88.20325829999999
file name : Image_30012024113750508.png
|
2024-01-30 11:37:50.618289 |
206 |
87491923 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.882919583333333
Longitude : 88.20927791666666
file name : Image_11012024132405624.png
|
2024-01-11 13:24:05.721365 |
207 |
87491923 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.882919583333333
Longitude : 88.20927791666666
file name : Image_11012024131546943.png
|
2024-01-11 13:15:47.056001 |
208 |
67322057 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.8929027
Longitude : 88.2088345
file name : Image_20022024081715622.png
|
2024-02-20 08:17:15.701674 |
209 |
67321861 |
Drainage Construction |
375000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.925374566666665
Longitude : 88.20139651666665
file name : Image_14032024143642054.png
|
2024-03-14 14:36:42.144524 |
210 |
67321861 |
Drainage Construction |
375000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.92532685
Longitude : 88.20087241666667
file name : Image_20022024123743322.png
|
2024-02-20 12:37:43.41451 |
211 |
67321814 |
Creation of drainage channel for management of grey water |
375000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.925332366666666
Longitude : 88.20129771666667
file name : Image_14032024143634319.png
|
2024-03-14 14:36:34.406593 |
212 |
67321814 |
Creation of drainage channel for management of grey water |
375000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.885133366666665
Longitude : 88.20169085
file name : Image_20022024122533891.png
|
2024-02-20 12:25:33.995082 |
213 |
67341300 |
Construction of roads |
375000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.91007553333333,23.909940666666664
Longitude : 88.19846471666666,88.19840498333333
file name : Image_20022024125240966.png
|
2024-02-20 12:52:41.046981 |
214 |
67340655 |
Construction of roads |
260000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.861639966666665,23.861639966666665
Longitude : 88.19632855,88.19632855
file name : Image_12032024082341811.png
|
2024-03-12 08:23:41.891736 |
215 |
67340655 |
Construction of roads |
260000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.87526026666667,23.87526026666667
Longitude : 88.21372976666667,88.21372976666667
file name : Image_20022024083519589.png
|
2024-02-20 08:35:19.671189 |
216 |
67323350 |
Construction of roads |
250000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.9000274,23.8852078
Longitude : 88.2143149,88.2015728
file name : Image_27032024095125352.png
|
2024-03-27 09:51:25.457325 |
217 |
67323350 |
Construction of roads |
250000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.884194216666668,23.884194216666668
Longitude : 88.19707976666665,88.19707976666665
file name : Image_13032024100027806.png
|
2024-03-13 10:00:27.897364 |
218 |
67323350 |
Construction of roads |
250000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.910238566666667,23.910238566666667
Longitude : 88.19861488333332,88.19861488333332
file name : Image_05032024094259916.png
|
2024-03-05 09:43:00.017169 |
219 |
67323350 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.8852167,23.8852167
Longitude : 88.20158,88.20158
file name : Image_20022024072022057.png
|
2024-02-20 07:20:22.143215 |
220 |
87490979 |
Creation of a new source of drinking water |
170000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.916098283333334
Longitude : 88.19104629999998
file name : Image_21122023092511099.png
|
2023-12-21 09:25:11.22483 |
221 |
87490913 |
Creation of a new source of drinking water |
170000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.921515066666664
Longitude : 88.19693671666667
file name : Image_22122023143206338.png
|
2023-12-22 14:32:06.453043 |
222 |
87490913 |
Creation of a new source of drinking water |
170000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.9217282
Longitude : 88.1968429
file name : Image_22122023143104014.png
|
2023-12-22 14:31:04.12309 |
223 |
87491183 |
Creation of a new source of drinking water |
170000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.86937986666667
Longitude : 88.21445838333332
file name : Image_11012024135709289.png
|
2024-01-11 13:57:09.37535 |
224 |
87491183 |
Creation of a new source of drinking water |
170000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.88400611666667
Longitude : 88.19431978333333
file name : Image_21122023085120174.png
|
2023-12-21 08:51:20.281434 |
225 |
67340933 |
Construction of roads |
375000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.92012485,23.92014158333333
Longitude : 88.19906796666668,88.19903036666668
file name : Image_06032024110544200.png
|
2024-03-06 11:05:44.379134 |
226 |
67340933 |
Construction of roads |
375000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.910238566666667,23.910238566666667
Longitude : 88.19861488333332,88.19861488333332
file name : Image_28022024104447875.png
|
2024-02-28 10:44:47.953654 |
227 |
67340933 |
Construction of roads |
375000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.921072733333336,23.92099956666667
Longitude : 88.19912286666667,88.19918003333332
file name : Image_20022024124402203.png
|
2024-02-20 12:44:02.298488 |
228 |
57861074 |
cc road from santoshpur pmgsy road towards faijul sk house |
260000 |
cc road from santoshpur pmgsy road towards faijul sk house1 |
Plinth level |
-
latitude : 23.867781750000002,23.867822266666668
Longitude : 88.20657863333332,88.20657328333333
file name : Image_30052023123927037.png
|
2023-05-30 12:39:27.174174 |
229 |
57861074 |
cc road from santoshpur pmgsy road towards faijul sk house |
260000 |
cc road from santoshpur pmgsy road towards faijul sk house1 |
Completion of work |
-
latitude : 23.8679106,23.8679106
Longitude : 88.20657048333332,88.20657048333332
file name : Image_06042023114525078.png
|
2023-04-06 11:45:25.238634 |
230 |
87491780 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.88492035
Longitude : 88.20010621666667
file name : Image_25012024165106728.png
|
2024-01-25 16:51:06.811022 |
231 |
87491672 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.89732763333333
Longitude : 88.18755503333333
file name : Image_30012024111035197.png
|
2024-01-30 11:10:35.288671 |
232 |
87491672 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.882919583333333
Longitude : 88.20927791666666
file name : Image_11012024120343134.png
|
2024-01-11 12:03:43.213072 |
233 |
87491618 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.898086066666664
Longitude : 88.18830168333334
file name : Image_30012024111331403.png
|
2024-01-30 11:13:31.272605 |
234 |
87491618 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.882919583333333
Longitude : 88.20927791666666
file name : Image_11012024120020300.png
|
2024-01-11 12:00:20.403988 |
235 |
87491209 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.88492035
Longitude : 88.20010621666667
file name : Image_25012024164400686.png
|
2024-01-25 16:44:00.777023 |
236 |
87491303 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.9253593
Longitude : 88.20332566666666
file name : Image_11012024160652179.png
|
2024-01-11 16:06:52.255651 |
237 |
87491154 |
Creation of a new source of drinking water |
170000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.86680358333333
Longitude : 88.2070134
file name : Image_21122023090140385.png
|
2023-12-21 09:01:40.499816 |
238 |
87491393 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.88492035
Longitude : 88.20010621666667
file name : Image_25012024163923649.png
|
2024-01-25 16:39:23.730631 |
239 |
87491504 |
Creation of a new source of drinking water |
125000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.88492035
Longitude : 88.20010621666667
file name : Image_25012024163554007.png
|
2024-01-25 16:35:54.096484 |
240 |
87491094 |
Creation of a new source of drinking water |
170000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.898757833333335
Longitude : 88.2012685
file name : Image_21122023100311302.png
|
2023-12-21 10:03:11.406094 |
241 |
87491036 |
Creation of a new source of drinking water |
170000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.916098283333334
Longitude : 88.19104629999998
file name : Image_21122023094218562.png
|
2023-12-21 09:42:18.649691 |
242 |
39082457 |
Arsenic Free water Treatment Plant at Kamnagar GP Office |
1700000 |
Arsenic Free water Treatment Plant at Kamnagar GP Office 1 |
Plinth level |
-
latitude : 23.90133543333333
Longitude : 88.19175183333333
file name : Image_28112021094733799.png
|
2021-11-28 09:47:33.920587 |
243 |
39082457 |
Arsenic Free water Treatment Plant at Kamnagar GP Office |
1700000 |
Arsenic Free water Treatment Plant at Kamnagar GP Office 1 |
Completion of work |
-
latitude : 23.90139713333333
Longitude : 88.1917761
file name : Image_23082021111817365.png
|
2021-08-23 11:18:17.455962 |
244 |
39082457 |
Arsenic Free water Treatment Plant at Kamnagar GP Office |
1700000 |
Arsenic Free water Treatment Plant at Kamnagar GP Office 1 |
Completion of work |
-
latitude : 23.901401250000003
Longitude : 88.19177725
file name : Image_23082021111821253.png
|
2021-08-23 11:18:21.351087 |
245 |
34732742 |
Arsenic Free water Treatment Plant at Tilipara abrar Dhar |
1700000 |
Arsenic Free water Treatment Plant at Tilipara abrar Dhar1 |
Plinth level |
-
latitude : 23.925262383333333
Longitude : 88.19822273333332
file name : Image_28112021092318530.png
|
2021-11-28 09:23:18.67057 |
246 |
34732742 |
Arsenic Free water Treatment Plant at Tilipara abrar Dhar |
1700000 |
Arsenic Free water Treatment Plant at Tilipara abrar Dhar1 |
Completion of work |
-
latitude : 23.925191499999997
Longitude : 88.19819965
file name : Image_22082021150430381.png
|
2021-08-22 15:04:30.492378 |
247 |
34732742 |
Arsenic Free water Treatment Plant at Tilipara abrar Dhar |
1700000 |
Arsenic Free water Treatment Plant at Tilipara abrar Dhar1 |
Completion of work |
-
latitude : 23.925189233333338
Longitude : 88.19829123333332
file name : Image_22082021150925586.png
|
2021-08-22 15:09:25.675675 |
248 |
34732742 |
Arsenic Free water Treatment Plant at Tilipara abrar Dhar |
1700000 |
Arsenic Free water Treatment Plant at Tilipara abrar Dhar1 |
Completion of work |
-
latitude : 23.92524255
Longitude : 88.1982092
file name : Image_22082021151215248.png
|
2021-08-22 15:12:15.340587 |
249 |
67204924 |
Creation of a new source of drinking water |
1600000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.9217337
Longitude : 88.1968159
file name : Image_14082024135000909.png
|
2024-08-14 13:50:01.012772 |
250 |
67204924 |
Creation of a new source of drinking water |
1600000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.9217451
Longitude : 88.1968181
file name : Image_08082024102626264.png
|
2024-08-08 10:26:26.358951 |
251 |
67204924 |
Creation of a new source of drinking water |
1600000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.921610533333332
Longitude : 88.19747315000001
file name : Image_14032024143626728.png
|
2024-03-14 14:36:26.818767 |
252 |
67340330 |
Boundary wall and Gate |
320000 |
Boundary wall and Gate1 |
Plinth level |
-
latitude : 23.91527879
Longitude : 88.19155384
file name : Image_14112024111326267.png
|
2024-11-14 11:13:26.355267 |
253 |
67340330 |
Boundary wall and Gate |
320000 |
Boundary wall and Gate1 |
Completion of work |
-
latitude : 23.91530944
Longitude : 88.19156174
file name : Image_08082024100824477.png
|
2024-08-08 10:08:24.580324 |
254 |
67339869 |
Boundary wall and Gate |
300000 |
Boundary wall and Gate1 |
Plinth level |
-
latitude : 23.9254651
Longitude : 88.1966533
file name : Image_14112024110224226.png
|
2024-11-14 11:02:24.315494 |
255 |
67339869 |
Boundary wall and Gate |
300000 |
Boundary wall and Gate1 |
Completion of work |
-
latitude : 23.92418986
Longitude : 88.19607761
file name : Image_08082024102910550.png
|
2024-08-08 10:29:10.658186 |
256 |
67321912 |
Drainage Construction |
400000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.92541311
Longitude : 88.20006002
file name : Image_14112024105602412.png
|
2024-11-14 10:56:02.498289 |
257 |
67321912 |
Drainage Construction |
400000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.92535951
Longitude : 88.20025054
file name : Image_08082024103316751.png
|
2024-08-08 10:33:16.851046 |
258 |
67321778 |
Creation of drainage channel for management of grey water |
400000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.8695305
Longitude : 88.2124882
file name : Image_14112024130901131.png
|
2024-11-14 13:09:01.220425 |
259 |
67321778 |
Creation of drainage channel for management of grey water |
400000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.86991761
Longitude : 88.21139803
file name : Image_14112024130432804.png
|
2024-11-14 13:04:32.891618 |
260 |
67321778 |
Creation of drainage channel for management of grey water |
400000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.86971385
Longitude : 88.21177614
file name : Image_07082024165306929.png
|
2024-08-07 16:53:07.018394 |
261 |
67205002 |
Creation of a new source of drinking water |
1600000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.92991212
Longitude : 88.19609677
file name : Image_14082024133619505.png
|
2024-08-14 13:36:19.644123 |
262 |
67205002 |
Creation of a new source of drinking water |
1600000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.92991835
Longitude : 88.19601347
file name : Image_08082024103810515.png
|
2024-08-08 10:38:10.615638 |
263 |
67205002 |
Creation of a new source of drinking water |
1600000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.930007816666663
Longitude : 88.19601528333332
file name : Image_14032024144921509.png
|
2024-03-14 14:49:21.621177 |
264 |
67204505 |
Creation of a new source of drinking water |
1600000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.86995314
Longitude : 88.20950328
file name : Image_14112024132458022.png
|
2024-11-14 13:24:58.12559 |
265 |
67204505 |
Creation of a new source of drinking water |
1600000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.884194216666668
Longitude : 88.19707976666665
file name : Image_14032024134906431.png
|
2024-03-14 13:49:06.516939 |