1 |
35025083 |
Construction of New Tubwell with platform at Uttar Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Uttar Mahadebnagar village1 |
Plinth level |
-
latitude : 24.6949082
Longitude : 87.9443557
file name : Image_10052021135033544.png
|
2021-05-10 13:50:33.624091 |
2 |
35025083 |
Construction of New Tubwell with platform at Uttar Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Uttar Mahadebnagar village1 |
Roof laid |
-
latitude : 24.69463974237442
Longitude : 87.94441427104175
file name : Image_10052021135557528.png
|
2021-05-10 13:55:57.613803 |
3 |
35025083 |
Construction of New Tubwell with platform at Uttar Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Uttar Mahadebnagar village1 |
Completion of work |
-
latitude : 24.69461183063686
Longitude : 87.94435618445277
file name : Image_11022021130129246.png
|
2021-02-11 13:01:29.317513 |
4 |
35032684 |
Construction of New Tubwell with platform at Nishindrapara village |
25000 |
Construction of New Tubwell with platform at Nishindrapara village1 |
Roof laid |
-
latitude : 24.6884541
Longitude : 87.9363296
file name : Image_07052021150101206.png
|
2021-05-07 15:01:01.277096 |
5 |
35032684 |
Construction of New Tubwell with platform at Nishindrapara village |
25000 |
Construction of New Tubwell with platform at Nishindrapara village1 |
Completion of work |
-
latitude : 24.687045025639236
Longitude : 87.93331327848136
file name : Image_07032021142200500.png
|
2021-03-07 14:22:00.565608 |
6 |
35032684 |
Construction of New Tubwell with platform at Nishindrapara village |
25000 |
Construction of New Tubwell with platform at Nishindrapara village1 |
Plinth level |
-
latitude : 24.687004792504013
Longitude : 87.93321948498487
file name : Image_08032021154652564.png
|
2021-03-08 15:46:52.65133 |
7 |
35029568 |
Construction of New Tubwell with platform at Per Ankura village |
25000 |
Construction of New Tubwell with platform at Per Ankura village1 |
Plinth level |
-
latitude : 24.67903519514948
Longitude : 87.92477027513087
file name : Image_07052021150805456.png
|
2021-05-07 15:08:05.524032 |
8 |
35029568 |
Construction of New Tubwell with platform at Per Ankura village |
25000 |
Construction of New Tubwell with platform at Per Ankura village1 |
Roof laid |
-
latitude : 24.67901880852878
Longitude : 87.92472937144339
file name : Image_07052021151004881.png
|
2021-05-07 15:10:04.945171 |
9 |
35029568 |
Construction of New Tubwell with platform at Per Ankura village |
25000 |
Construction of New Tubwell with platform at Per Ankura village1 |
Completion of work |
-
latitude : 24.6779899
Longitude : 87.924074
file name : Image_10022021120117760.png
|
2021-02-10 12:01:17.824768 |
10 |
35029114 |
Construction of New Tubwell with platform at Gopalnagar village |
25000 |
Construction of New Tubwell with platform at Gopalnagar village1 |
Plinth level |
-
latitude : 24.68677718192339
Longitude : 87.92347149923444
file name : Image_14062021131224548.png
|
2021-06-14 13:12:24.617267 |
11 |
35029114 |
Construction of New Tubwell with platform at Gopalnagar village |
25000 |
Construction of New Tubwell with platform at Gopalnagar village1 |
Roof laid |
-
latitude : 24.686773493885994
Longitude : 87.92348113842309
file name : Image_14062021131736131.png
|
2021-06-14 13:17:36.203186 |
12 |
35029114 |
Construction of New Tubwell with platform at Gopalnagar village |
25000 |
Construction of New Tubwell with platform at Gopalnagar village1 |
Completion of work |
-
latitude : 24.686786402016878
Longitude : 87.92356629855931
file name : Image_10022021114101247.png
|
2021-02-10 11:41:01.32512 |
13 |
35018900 |
Construction of New Tubwell with platform at Uttar Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Uttar Mahadebnagar village1 |
Roof laid |
-
latitude : 24.693615473806858
Longitude : 87.9414568003267
file name : Image_02092021115235095.png
|
2021-09-02 11:52:35.1887 |
14 |
35018900 |
Construction of New Tubwell with platform at Uttar Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Uttar Mahadebnagar village1 |
Plinth level |
-
latitude : 24.69368990510702
Longitude : 87.94147230684757
file name : Image_26022021114440767.png
|
2021-02-26 11:44:40.848776 |
15 |
35018900 |
Construction of New Tubwell with platform at Uttar Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Uttar Mahadebnagar village1 |
Completion of work |
-
latitude : 24.69365604221821
Longitude : 87.94140667654574
file name : Image_05022021131853129.png
|
2021-02-05 13:18:53.206156 |
16 |
35018900 |
Construction of New Tubwell with platform at Uttar Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Uttar Mahadebnagar village1 |
Completion of work |
-
latitude : 24.69365604221821
Longitude : 87.94140667654574
file name : Image_05022021131903207.png
|
2021-02-05 13:19:03.280481 |
17 |
35009866 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village1 |
Plinth level |
-
latitude : 24.6879413
Longitude : 87.9375379
file name : Image_25082021114144684.png
|
2021-08-25 11:41:44.761805 |
18 |
35009866 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village1 |
Roof laid |
-
latitude : 24.687944
Longitude : 87.9375347
file name : Image_25082021114258538.png
|
2021-08-25 11:42:58.615682 |
19 |
35009866 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village1 |
Completion of work |
-
latitude : 24.68794532585889
Longitude : 87.93782106600702
file name : Image_18022021124624384.png
|
2021-02-18 12:46:24.464669 |
20 |
35008585 |
Construction of New Tubwell with platform at Dakshin Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Dakshin Mahadebnagar village1 |
Roof laid |
-
latitude : 24.68480932060629
Longitude : 87.93967413716018
file name : Image_08092021111356108.png
|
2021-09-08 11:13:56.181105 |
21 |
35008585 |
Construction of New Tubwell with platform at Dakshin Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Dakshin Mahadebnagar village1 |
Plinth level |
-
latitude : 24.684845698066056
Longitude : 87.93969634920359
file name : Image_23032021155549788.png
|
2021-03-23 15:55:49.874847 |
22 |
35008585 |
Construction of New Tubwell with platform at Dakshin Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Dakshin Mahadebnagar village1 |
Completion of work |
-
latitude : 24.684839663095772
Longitude : 87.93960372917354
file name : Image_10022021131717960.png
|
2021-02-10 13:17:18.059155 |
23 |
35007366 |
Construction of New Tubwell with platform at Per Momrejpur village |
25000 |
Construction of New Tubwell with platform at Per Momrejpur village1 |
Roof laid |
-
latitude : 24.69108870718628
Longitude : 87.94047527946532
file name : Image_13042021133527664.png
|
2021-04-13 13:35:27.8058 |
24 |
35007366 |
Construction of New Tubwell with platform at Per Momrejpur village |
25000 |
Construction of New Tubwell with platform at Per Momrejpur village1 |
Plinth level |
-
latitude : 24.69113878905773
Longitude : 87.94047268107533
file name : Image_26022021115140477.png
|
2021-02-26 11:51:40.559788 |
25 |
35007366 |
Construction of New Tubwell with platform at Per Momrejpur village |
25000 |
Construction of New Tubwell with platform at Per Momrejpur village1 |
Completion of work |
-
latitude : 24.69143869355321
Longitude : 87.9404398240149
file name : Image_05022021131856439.png
|
2021-02-05 13:18:56.509078 |
26 |
35007366 |
Construction of New Tubwell with platform at Per Momrejpur village |
25000 |
Construction of New Tubwell with platform at Per Momrejpur village1 |
Completion of work |
-
latitude : 24.69143869355321
Longitude : 87.9404398240149
file name : Image_05022021131906611.png
|
2021-02-05 13:19:06.682716 |
27 |
34981260 |
Construction of New Tubwell with platform at Tarapur village. |
25000 |
Construction of New Tubwell with platform at Tarapur village.1 |
Plinth level |
-
latitude : 24.70897443126887
Longitude : 87.91818394325674
file name : Image_13082021104814249.png
|
2021-08-13 10:48:14.323249 |
28 |
34981260 |
Construction of New Tubwell with platform at Tarapur village. |
25000 |
Construction of New Tubwell with platform at Tarapur village.1 |
Roof laid |
-
latitude : 24.708931893110275
Longitude : 87.91814714670181
file name : Image_13082021105642349.png
|
2021-08-13 10:56:42.424731 |
29 |
34981260 |
Construction of New Tubwell with platform at Tarapur village. |
25000 |
Construction of New Tubwell with platform at Tarapur village.1 |
Plinth level |
-
latitude : 24.708980550058186
Longitude : 87.9181286226958
file name : Image_26022021104733253.png
|
2021-02-26 10:47:33.338429 |
30 |
34981260 |
Construction of New Tubwell with platform at Tarapur village. |
25000 |
Construction of New Tubwell with platform at Tarapur village.1 |
Completion of work |
-
latitude : 24.70894480124116
Longitude : 87.91805268265307
file name : Image_10022021104803822.png
|
2021-02-10 10:48:03.898076 |
31 |
35007146 |
Construction of New Tubwell with platform at Momrejpur village |
25000 |
Construction of New Tubwell with platform at Momrejpur village1 |
Roof laid |
-
latitude : 24.692696146667004
Longitude : 87.93822448700666
file name : Image_10052021105655534.png
|
2021-05-10 10:56:55.644108 |
32 |
35007146 |
Construction of New Tubwell with platform at Momrejpur village |
25000 |
Construction of New Tubwell with platform at Momrejpur village1 |
Plinth level |
-
latitude : 24.69273583497852
Longitude : 87.93818878009915
file name : Image_26022021113502587.png
|
2021-02-26 11:35:02.577459 |
33 |
35007146 |
Construction of New Tubwell with platform at Momrejpur village |
25000 |
Construction of New Tubwell with platform at Momrejpur village1 |
Completion of work |
-
latitude : 24.69262728933245
Longitude : 87.93820755556226
file name : Image_05022021131849764.png
|
2021-02-05 13:18:49.839967 |
34 |
34949011 |
Construction of Concrete road from the house of Asraful to Najrul |
150000 |
Construction of Concrete road from the house of Asraful to Najrul1 |
Roof laid |
-
latitude : 24.684930900111794,24.68502716626972,24.685004032216966,24.685044516809285,24.685010444372892,24.6850540721789
Longitude : 87.93949660845101,87.93936719186604,87.93950113467872,87.93950934894383,87.93967665173113,87.93969593010843
file name : Image_23032021155410286.png
|
2021-03-23 15:54:10.368218 |
35 |
34949011 |
Construction of Concrete road from the house of Asraful to Najrul |
150000 |
Construction of Concrete road from the house of Asraful to Najrul1 |
Plinth level |
-
latitude : 24.685033997520804,24.685028549283743
Longitude : 87.93951949104667,87.93949417769909
file name : Image_08022021150520243.png
|
2021-02-08 15:05:20.305699 |
36 |
34949011 |
Construction of Concrete road from the house of Asraful to Najrul |
150000 |
Construction of Concrete road from the house of Asraful to Najrul1 |
Completion of work |
-
latitude : 24.685026495717466,24.68503382988274,24.684986514039338,24.685047576203942,24.685012833215296,24.685013336129487,24.68497930560261,24.68491941690445,24.68491941690445
Longitude : 87.93968293815851,87.93968109413981,87.9396905656904,87.93951337225735,87.93949878774583,87.939377669245,87.93948202393949,87.93945981189609,87.93945981189609
file name : Image_01022021160412476.png
|
2021-02-01 16:04:12.539544 |
37 |
34950667 |
Construction of Concrete road from the house of Manarul Hoque to Rabiul Islam |
150000 |
Construction of Concrete road from the house of Manarul Hoque to Rabiul Islam1 |
Roof laid |
-
latitude : 24.6836793,24.68330426607281
Longitude : 87.9397003,87.93924389407039
file name : Image_25032021104637634.png
|
2021-03-25 10:46:37.741725 |
38 |
34950667 |
Construction of Concrete road from the house of Manarul Hoque to Rabiul Islam |
150000 |
Construction of Concrete road from the house of Manarul Hoque to Rabiul Islam1 |
Plinth level |
-
latitude : 24.6837264,24.683346804231405
Longitude : 87.9396674,87.93924406170845
file name : Image_08022021103900379.png
|
2021-02-08 10:39:00.479644 |
39 |
34950667 |
Construction of Concrete road from the house of Manarul Hoque to Rabiul Islam |
150000 |
Construction of Concrete road from the house of Manarul Hoque to Rabiul Islam1 |
Completion of work |
-
latitude : 24.6837072,24.6829807
Longitude : 87.9396505,87.9400671
file name : Image_29012021134826382.png
|
2021-01-29 13:48:26.467863 |
40 |
34937851 |
Construction of Concrete road from the house of Sohorab Ali to Taimur Momin |
200000 |
Construction of Concrete road from the house of Sohorab Ali to Taimur Momin1 |
Roof laid |
-
latitude : 24.6913667,24.6914305,24.6904282,24.6904282,24.69144778791815,24.691437939181924
Longitude : 87.9425302,87.9424482,87.9422115,87.9422115,87.94294014573097,87.94300753623247
file name : Image_25032021161759467.png
|
2021-03-25 16:17:59.544579 |
41 |
34937851 |
Construction of Concrete road from the house of Sohorab Ali to Taimur Momin |
200000 |
Construction of Concrete road from the house of Sohorab Ali to Taimur Momin1 |
Plinth level |
-
latitude : 24.691352024674416,24.6914661,24.6914647,24.69141430221498,24.6904282,24.691487015224993,24.6914357598871
Longitude : 87.94244905002415,87.9424489,87.9424467,87.9428611882031,87.9422115,87.94285289011896,87.94295305386186
file name : Image_26022021142345055.png
|
2021-02-26 14:23:45.129351 |
42 |
34937851 |
Construction of Concrete road from the house of Sohorab Ali to Taimur Momin |
200000 |
Construction of Concrete road from the house of Sohorab Ali to Taimur Momin1 |
Completion of work |
-
latitude : 24.691471,24.691471,24.6914689,24.6914705,24.691459103487432
Longitude : 87.9424485,87.9424484,87.942441,87.9424403,87.94290971942246
file name : Image_29012021144508196.png
|
2021-01-29 14:45:08.27858 |
43 |
34893943 |
Construction Drain with road Jahirul to Naimuddin Nutan Momrejpur |
247282 |
Construction Drain with road Jahirul to Naimuddin Nutan Momrejpur1 |
Roof laid |
-
latitude : 24.698768416419625,24.69907875638455,24.699160647578537
Longitude : 87.92591650038958,87.92602613568306,87.92580921202898
file name : Image_11022022120628125.png
|
2022-02-11 12:06:28.207465 |
44 |
34893943 |
Construction Drain with road Jahirul to Naimuddin Nutan Momrejpur |
247282 |
Construction Drain with road Jahirul to Naimuddin Nutan Momrejpur1 |
Plinth level |
-
latitude : 24.69917133450508,24.699099,24.699099,24.699099,24.699099,24.6991075
Longitude : 87.92589655146003,87.9253601,87.9253601,87.9253601,87.9253601,87.925973
file name : Image_10022021111458248.png
|
2021-02-10 11:14:58.318021 |
45 |
34893943 |
Construction Drain with road Jahirul to Naimuddin Nutan Momrejpur |
247282 |
Construction Drain with road Jahirul to Naimuddin Nutan Momrejpur1 |
Completion of work |
-
latitude : 24.69916437752545,24.699086300097406,24.69874511472881
Longitude : 87.92581206187606,87.92597567662597,87.92585883289576
file name : Image_01022021144205236.png
|
2021-02-01 14:42:05.316052 |
46 |
34945370 |
Construction of Concrete road with drain from the house of Daya Das to ICDS Center |
250000 |
Construction of Concrete road with drain from the house of Daya Das to ICDS Center 1 |
Roof laid |
-
latitude : 24.690702175721526,24.6914781,24.6914781,24.690702804364264
Longitude : 87.93835415504873,87.9376163,87.9376163,87.93873972259462
file name : Image_13042021134430581.png
|
2021-04-13 13:44:30.659592 |
47 |
34945370 |
Construction of Concrete road with drain from the house of Daya Das to ICDS Center |
250000 |
Construction of Concrete road with drain from the house of Daya Das to ICDS Center 1 |
Plinth level |
-
latitude : 24.6918449,24.6886577,24.690636754967272,24.690601634792984
Longitude : 87.9373099,87.9375782,87.93831115588546,87.9381965752691
file name : Image_26022021120138516.png
|
2021-02-26 12:01:38.584116 |
48 |
34945370 |
Construction of Concrete road with drain from the house of Daya Das to ICDS Center |
250000 |
Construction of Concrete road with drain from the house of Daya Das to ICDS Center 1 |
Completion of work |
-
latitude : 24.690694212913513,24.69059065449983
Longitude : 87.93872807174921,87.93849346227944
file name : Image_29012021141742362.png
|
2021-01-29 14:17:42.434206 |
49 |
34945370 |
Construction of Concrete road with drain from the house of Daya Das to ICDS Center |
250000 |
Construction of Concrete road with drain from the house of Daya Das to ICDS Center 1 |
Completion of work |
-
latitude : 24.690568568184972,24.6907224599272
Longitude : 87.93816807679832,87.93871231377125
file name : Image_29012021141745768.png
|
2021-01-29 14:17:45.83272 |
50 |
34945370 |
Construction of Concrete road with drain from the house of Daya Das to ICDS Center |
250000 |
Construction of Concrete road with drain from the house of Daya Das to ICDS Center 1 |
Completion of work |
-
latitude : 24.690568568184972,24.6907224599272
Longitude : 87.93816807679832,87.93871231377125
file name : Image_29012021141753108.png
|
2021-01-29 14:17:53.173157 |
51 |
34945079 |
Construction of Concrete road with drain from the house of Sanatan Saha to Sntu Pal |
250000 |
Construction of Concrete road with drain from the house of Sanatan Saha to Sntu Pal 1 |
Roof laid |
-
latitude : 24.690892486833036,24.691464635543525
Longitude : 87.93970414437354,87.93988049961627
file name : Image_13042021132913473.png
|
2021-04-13 13:29:13.566414 |
52 |
34945079 |
Construction of Concrete road with drain from the house of Sanatan Saha to Sntu Pal |
250000 |
Construction of Concrete road with drain from the house of Sanatan Saha to Sntu Pal 1 |
Plinth level |
-
latitude : 24.6926118,24.691049647517502
Longitude : 87.9391481,87.93980246409774
file name : Image_26022021115732916.png
|
2021-02-26 11:57:33.009941 |
53 |
34945079 |
Construction of Concrete road with drain from the house of Sanatan Saha to Sntu Pal |
250000 |
Construction of Concrete road with drain from the house of Sanatan Saha to Sntu Pal 1 |
Completion of work |
-
latitude : 24.6908762678504,24.691079193726182
Longitude : 87.93971269391477,87.93941681273282
file name : Image_29012021141749311.png
|
2021-01-29 14:17:49.382832 |
54 |
34945079 |
Construction of Concrete road with drain from the house of Sanatan Saha to Sntu Pal |
250000 |
Construction of Concrete road with drain from the house of Sanatan Saha to Sntu Pal 1 |
Completion of work |
-
latitude : 24.6908762678504,24.691079193726182
Longitude : 87.93971269391477,87.93941681273282
file name : Image_29012021141756742.png
|
2021-01-29 14:17:56.814558 |
55 |
34895415 |
Construction of Concrete road with drain from the house of Sanaul to Main road |
220000 |
Construction of Concrete road with drain from the house of Sanaul to Main road 1 |
Roof laid |
-
latitude : 24.698162572458386,24.69794661272317
Longitude : 87.92821020819247,87.92822152376175
file name : Image_11022022114428344.png
|
2022-02-11 11:44:28.429813 |
56 |
34895415 |
Construction of Concrete road with drain from the house of Sanaul to Main road |
220000 |
Construction of Concrete road with drain from the house of Sanaul to Main road 1 |
Plinth level |
-
latitude : 24.698181934654713,24.69798152334988
Longitude : 87.92819528840482,87.92818673886359
file name : Image_10022021112205157.png
|
2021-02-10 11:22:05.224222 |
57 |
34895415 |
Construction of Concrete road with drain from the house of Sanaul to Main road |
220000 |
Construction of Concrete road with drain from the house of Sanaul to Main road 1 |
Completion of work |
-
latitude : 24.698210055939853,24.698248780332506
Longitude : 87.92877959087491,87.92880658060312
file name : Image_01022021144317292.png
|
2021-02-01 14:43:17.37848 |
58 |
34895415 |
Construction of Concrete road with drain from the house of Sanaul to Main road |
220000 |
Construction of Concrete road with drain from the house of Sanaul to Main road 1 |
Completion of work |
-
latitude : 24.698210055939853,24.698248780332506
Longitude : 87.92877959087491,87.92880658060312
file name : Image_01022021144450136.png
|
2021-02-01 14:44:50.224213 |
59 |
34957299 |
Construction of Concrete road from the house of Manik sk to Bona Sk |
270000 |
Construction of Concrete road from the house of Manik sk to Bona Sk 1 |
Roof laid |
-
latitude : 24.6917189,24.69200363382697,24.69198938459158
Longitude : 87.9450897,87.94340567663312,87.94352713041008
file name : Image_10052021140209683.png
|
2021-05-10 14:02:09.741381 |
60 |
34957299 |
Construction of Concrete road from the house of Manik sk to Bona Sk |
270000 |
Construction of Concrete road from the house of Manik sk to Bona Sk 1 |
Plinth level |
-
latitude : 24.6918718,24.691971237771213
Longitude : 87.9450675,87.94353215955198
file name : Image_11022021124919258.png
|
2021-02-11 12:49:19.338268 |
61 |
34957299 |
Construction of Concrete road from the house of Manik sk to Bona Sk |
270000 |
Construction of Concrete road from the house of Manik sk to Bona Sk 1 |
Completion of work |
-
latitude : 24.692113185301423,24.691979200579226
Longitude : 87.94296562671661,87.94351036660373
file name : Image_01022021144341164.png
|
2021-02-01 14:43:41.245079 |
62 |
34897527 |
Construction of Concrete road with drain from the house of Rafikul to Abu |
200000 |
Construction of Concrete road with drain from the house of Rafikul to Abu1 |
Roof laid |
-
latitude : 24.698137426748872,24.698583260178566
Longitude : 87.92755574919283,87.9276003409177
file name : Image_11022022114234316.png
|
2022-02-11 11:42:34.399144 |
63 |
34897527 |
Construction of Concrete road with drain from the house of Rafikul to Abu |
200000 |
Construction of Concrete road with drain from the house of Rafikul to Abu1 |
Plinth level |
-
latitude : 24.69861519522965,24.69855995848775,24.698212193325162
Longitude : 87.92769799008965,87.92753219604492,87.92754476889968
file name : Image_05022021104231053.png
|
2021-02-05 10:42:31.131095 |
64 |
34897527 |
Construction of Concrete road with drain from the house of Rafikul to Abu |
200000 |
Construction of Concrete road with drain from the house of Rafikul to Abu1 |
Completion of work |
-
latitude : 24.69859172590077,24.698186293244362
Longitude : 87.92754602618515,87.92753580026329
file name : Image_01022021144243419.png
|
2021-02-01 14:42:43.506501 |
65 |
34897527 |
Construction of Concrete road with drain from the house of Rafikul to Abu |
200000 |
Construction of Concrete road with drain from the house of Rafikul to Abu1 |
Completion of work |
-
latitude : 24.69859172590077,24.698186293244362
Longitude : 87.92754602618515,87.92753580026329
file name : Image_01022021144421629.png
|
2021-02-01 14:44:21.712207 |
66 |
34962075 |
Construction of Concrete road from the house of Fatik to Alfa |
200000 |
Construction of Concrete road from the house of Fatik to Alfa 1 |
Roof laid |
-
latitude : 24.7086578,24.70992862712592
Longitude : 87.9192308,87.91908181272447
file name : Image_13082021104049039.png
|
2021-08-13 10:40:49.112188 |
67 |
34962075 |
Construction of Concrete road from the house of Fatik to Alfa |
200000 |
Construction of Concrete road from the house of Fatik to Alfa 1 |
Plinth level |
-
latitude : 24.709632243029773,24.709957418963313
Longitude : 87.91879087686539,87.91910318657756
file name : Image_26022021105734537.png
|
2021-02-26 10:57:34.620919 |
68 |
34962075 |
Construction of Concrete road from the house of Fatik to Alfa |
200000 |
Construction of Concrete road from the house of Fatik to Alfa 1 |
Completion of work |
-
latitude : 24.70964309759438,24.709951844997704
Longitude : 87.91876489296556,87.91907569393516
file name : Image_10022021104009976.png
|
2021-02-10 10:40:10.045657 |
69 |
35008071 |
Construction of New Tubwell with platform at Dakshin Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Dakshin Mahadebnagar village1 |
Roof laid |
-
latitude : 24.683667
Longitude : 87.9396772
file name : Image_16082021110700678.png
|
2021-08-16 11:07:00.751101 |
70 |
35008071 |
Construction of New Tubwell with platform at Dakshin Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Dakshin Mahadebnagar village1 |
Plinth level |
-
latitude : 24.6836788
Longitude : 87.9396992
file name : Image_25032021104258225.png
|
2021-03-25 10:42:58.31832 |
71 |
35008071 |
Construction of New Tubwell with platform at Dakshin Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Dakshin Mahadebnagar village1 |
Completion of work |
-
latitude : 24.6837242
Longitude : 87.9396626
file name : Image_08022021104247434.png
|
2021-02-08 10:42:47.511943 |
72 |
35006456 |
Construction of New Tubwell with platform at Momrejpur village |
25000 |
Construction of New Tubwell with platform at Momrejpur village1 |
Roof laid |
-
latitude : 24.6911072
Longitude : 87.9376163
file name : Image_10052021113607214.png
|
2021-05-10 11:36:07.317362 |
73 |
35006456 |
Construction of New Tubwell with platform at Momrejpur village |
25000 |
Construction of New Tubwell with platform at Momrejpur village1 |
Plinth level |
-
latitude : 24.693735083565116
Longitude : 87.93706845492125
file name : Image_26022021112850374.png
|
2021-02-26 11:28:50.447857 |
74 |
35006456 |
Construction of New Tubwell with platform at Momrejpur village |
25000 |
Construction of New Tubwell with platform at Momrejpur village1 |
Completion of work |
-
latitude : 24.693668531253934
Longitude : 87.93703182600439
file name : Image_05022021105208298.png
|
2021-02-05 10:52:08.388481 |
75 |
35009317 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village1 |
Roof laid |
-
latitude : 24.686366426758468
Longitude : 87.93481456115842
file name : Image_10052021133536394.png
|
2021-05-10 13:35:36.464517 |
76 |
35009317 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village1 |
Plinth level |
-
latitude : 24.69935728702694
Longitude : 87.92807492427528
file name : Image_26022021111747483.png
|
2021-02-26 11:17:47.552293 |
77 |
35009317 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village1 |
Completion of work |
-
latitude : 24.688740894198418
Longitude : 87.93878389522433
file name : Image_05022021131859710.png
|
2021-02-05 13:18:59.779763 |
78 |
35009317 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village1 |
Completion of work |
-
latitude : 24.688740894198418
Longitude : 87.93878389522433
file name : Image_05022021131910214.png
|
2021-02-05 13:19:10.285458 |
79 |
59500091 |
Construction of New Tubwell with platform in front of Nipu Sk at Gopalnagar village |
25000 |
Construction of New Tubwell with platform in front of Nipu Sk at Gopalnagar village1 |
Completion of work |
-
latitude : 24.6888168
Longitude : 87.9387349
file name : Image_13102023123606779.png
|
2023-10-13 12:36:06.878661 |
80 |
59500291 |
Construction of New Tubwell with platform in front of Gopalnagar Graveyard at Gopalnagar village |
25000 |
Construction of New Tubwell with platform in front of Gopalnagar Graveyard at Gopalnagar village1 |
Completion of work |
-
latitude : 24.6888175
Longitude : 87.9387282
file name : Image_13102023123136852.png
|
2023-10-13 12:31:36.951314 |
81 |
59500291 |
Construction of New Tubwell with platform in front of Gopalnagar Graveyard at Gopalnagar village |
25000 |
Construction of New Tubwell with platform in front of Gopalnagar Graveyard at Gopalnagar village1 |
Completion of work |
-
latitude : 24.69283599872142
Longitude : 87.92925107292831
file name : Image_22082023142443533.png
|
2023-08-22 14:24:43.623324 |
82 |
59500746 |
Construction of New Tubwell with platform in front of Khaled at Gopalnagar village |
25000 |
Construction of New Tubwell with platform in front of Khaled at Gopalnagar village1 |
Completion of work |
-
latitude : 24.710171199403703
Longitude : 87.91936436668038
file name : Image_21082023112018630.png
|
2023-08-21 11:20:18.731803 |
83 |
74444034 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.69249292742461
Longitude : 87.93888472951949
file name : Image_14072023114259943.png
|
2023-07-14 11:43:00.074472 |
84 |
74444034 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.693712913431227
Longitude : 87.9372847918421
file name : Image_13062023101431834.png
|
2023-06-13 10:14:31.926791 |
85 |
74445126 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.6934768
Longitude : 87.9379218
file name : Image_12102023115534950.png
|
2023-10-12 11:55:35.688739 |
86 |
74445126 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.692488652653992
Longitude : 87.93889495544136
file name : Image_13062023101043758.png
|
2023-06-13 10:10:43.850005 |
87 |
74445531 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.692550217732787
Longitude : 87.93857334181666
file name : Image_13062023100321654.png
|
2023-06-13 10:03:21.748057 |
88 |
74446243 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.6852187
Longitude : 87.9409861
file name : Image_19072023113148209.png
|
2023-07-19 11:31:48.321374 |
89 |
75677888 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.6849842
Longitude : 87.9428459
file name : Image_15062023074453313.png
|
2023-06-15 07:44:53.417791 |
90 |
75678024 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.6854478539899
Longitude : 87.94018803164363
file name : Image_19072023113151816.png
|
2023-07-19 11:31:51.915772 |
91 |
75678024 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.6854478539899
Longitude : 87.94018803164363
file name : Image_19072023113202601.png
|
2023-07-19 11:32:02.695851 |
92 |
75678410 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.6851922
Longitude : 87.9426962
file name : Image_15062023075405379.png
|
2023-06-15 07:54:05.486473 |
93 |
75678481 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.685146985575557
Longitude : 87.93965519405901
file name : Image_15062023080201463.png
|
2023-06-15 08:02:01.595282 |
94 |
75678710 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.6879206
Longitude : 87.9374534
file name : Image_13062023093715701.png
|
2023-06-13 09:37:15.802014 |
95 |
75678808 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.6869061
Longitude : 87.9376838
file name : Image_26062023101521222.png
|
2023-06-26 10:15:21.325355 |
96 |
75679253 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.687676
Longitude : 87.9366795
file name : Image_18062023114844017.png
|
2023-06-18 11:48:44.11168 |
97 |
75679509 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.6875821
Longitude : 87.935657
file name : Image_26062023102352866.png
|
2023-06-26 10:23:52.962827 |
98 |
75679509 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.686559294350445
Longitude : 87.93821618892252
file name : Image_13062023085902007.png
|
2023-06-13 08:59:02.094985 |
99 |
34955518 |
Construction of Concrete road from Main road to Piyara Bibi land via New Masjid |
150000 |
Construction of Concrete road from Main road to Piyara Bibi land via New Masjid 1 |
Plinth level |
-
latitude : 24.6869089,24.6879099,24.6879099
Longitude : 87.9376384,87.9375629,87.9375629
file name : Image_14062021154721863.png
|
2021-06-14 15:47:21.46083 |
100 |
34955518 |
Construction of Concrete road from Main road to Piyara Bibi land via New Masjid |
150000 |
Construction of Concrete road from Main road to Piyara Bibi land via New Masjid 1 |
Roof laid |
-
latitude : 24.6878306,24.687815
Longitude : 87.9375826,87.9377572
file name : Image_14062021155052012.png
|
2021-06-14 15:50:51.628844 |
101 |
34955518 |
Construction of Concrete road from Main road to Piyara Bibi land via New Masjid |
150000 |
Construction of Concrete road from Main road to Piyara Bibi land via New Masjid 1 |
Completion of work |
-
latitude : 24.687188188545406,24.68711639754474,24.68708303757012
Longitude : 87.9378305375576,87.93801669962704,87.93801091611385
file name : Image_29012021142642531.png
|
2021-01-29 14:26:42.595325 |
102 |
34978089 |
Emergency Flood Protection of GP Area for All Sansad |
1000000 |
Emergency Flood Protection of GP Area for All Sansad1 |
Completion of work |
-
latitude : 24.6850307
Longitude : 87.9428325
file name : Image_02072021153553247.png
|
2021-07-02 15:35:53.386128 |
103 |
34957821 |
Construction of Concrete road from the house of Tina Pal to Sudhir Pal |
265000 |
Construction of Concrete road from the house of Tina Pal to Sudhir Pal 1 |
Plinth level |
-
latitude : 24.6933912,24.693561661988497
Longitude : 87.9419051,87.94282925315201
file name : Image_17092021115543898.png
|
2021-09-17 11:55:43.995099 |
104 |
34957821 |
Construction of Concrete road from the house of Tina Pal to Sudhir Pal |
265000 |
Construction of Concrete road from the house of Tina Pal to Sudhir Pal 1 |
Roof laid |
-
latitude : 24.69362092204392,24.6941456
Longitude : 87.94284928590059,87.9428241
file name : Image_17092021120036533.png
|
2021-09-17 12:00:36.608091 |
105 |
34957821 |
Construction of Concrete road from the house of Tina Pal to Sudhir Pal |
265000 |
Construction of Concrete road from the house of Tina Pal to Sudhir Pal 1 |
Completion of work |
-
latitude : 24.6945206,24.693622598424554,24.6937747,24.693503072485328
Longitude : 87.9431305,87.94276915490627,87.9428241,87.94255164451897
file name : Image_18082021145916546.png
|
2021-08-18 14:59:16.643071 |
106 |
34958140 |
Construction of Concrete road from the house of Kalu sk to Rajib Sk |
265000 |
Construction of Concrete road from the house of Kalu sk to Rajib Sk1 |
Plinth level |
-
latitude : 24.694201285019517,24.694363474845886
Longitude : 87.94436221942306,87.94440848752856
file name : Image_15022022134148188.png
|
2022-02-15 13:41:48.277614 |
107 |
34958140 |
Construction of Concrete road from the house of Kalu sk to Rajib Sk |
265000 |
Construction of Concrete road from the house of Kalu sk to Rajib Sk1 |
Plinth level |
-
latitude : 24.6942160371691,24.6941831
Longitude : 87.944351490587,87.945581
file name : Image_17092021120738088.png
|
2021-09-17 12:07:38.145905 |
108 |
34958140 |
Construction of Concrete road from the house of Kalu sk to Rajib Sk |
265000 |
Construction of Concrete road from the house of Kalu sk to Rajib Sk1 |
Completion of work |
-
latitude : 24.6942287,24.694207068532705
Longitude : 87.9444498,87.94437294825912
file name : Image_18082021150737322.png
|
2021-08-18 15:07:37.393563 |
109 |
34963670 |
Construction of Concrete road from the house of Sefaur to Rafikul |
200000 |
Construction of Concrete road from the house of Sefaur to Rafikul 1 |
Plinth level |
-
latitude : 24.708957164548337,24.70914097968489
Longitude : 87.91799669153988,87.91812149807811
file name : Image_13092021105443603.png
|
2021-09-13 10:54:43.710836 |
110 |
34963670 |
Construction of Concrete road from the house of Sefaur to Rafikul |
200000 |
Construction of Concrete road from the house of Sefaur to Rafikul 1 |
Roof laid |
-
latitude : 24.70897807739675,24.70907874405384
Longitude : 87.91799124330282,87.91816106066108
file name : Image_13092021110042886.png
|
2021-09-13 11:00:43.026566 |
111 |
34963670 |
Construction of Concrete road from the house of Sefaur to Rafikul |
200000 |
Construction of Concrete road from the house of Sefaur to Rafikul 1 |
Completion of work |
-
latitude : 24.708973048254848,24.70909756142646
Longitude : 87.91800037957728,87.9180704522878
file name : Image_13082021105807048.png
|
2021-08-13 10:58:07.134652 |
112 |
34964812 |
Construction of Concrete road from the house of Yeasin to Mistar |
200000 |
Construction of Concrete road from the house of Yeasin to Mistar 1 |
Plinth level |
-
latitude : 24.708759980276227,24.70878625754267,24.70887791365385,24.708928163163364
Longitude : 87.92012468911707,87.92020171880722,87.92012192308903,87.92020884342492
file name : Image_13092021110432949.png
|
2021-09-13 11:04:33.005898 |
113 |
34964812 |
Construction of Concrete road from the house of Yeasin to Mistar |
200000 |
Construction of Concrete road from the house of Yeasin to Mistar 1 |
Roof laid |
-
latitude : 24.708811822347343,24.708891031332314,24.7089150454849
Longitude : 87.92016928084195,87.92012779042125,87.92017447762191
file name : Image_13092021110818361.png
|
2021-09-13 11:08:18.428916 |
114 |
34964812 |
Construction of Concrete road from the house of Yeasin to Mistar |
200000 |
Construction of Concrete road from the house of Yeasin to Mistar 1 |
Completion of work |
-
latitude : 24.709040983580053,24.708917224779725,24.70884786453098
Longitude : 87.92029383592308,87.92012913152575,87.92015142738819
file name : Image_13082021102414393.png
|
2021-08-13 10:24:14.479135 |
115 |
34954591 |
Construction of Concrete road from Garls high Madrasah to Abhijan Sangho Club |
150000 |
Construction of Concrete road from Garls high Madrasah to Abhijan Sangho Club1 |
Roof laid |
-
latitude : 24.6887449,24.6881882
Longitude : 87.9386205,87.9376621
file name : Image_15022022142818137.png
|
2022-02-15 14:28:18.221912 |
116 |
34954591 |
Construction of Concrete road from Garls high Madrasah to Abhijan Sangho Club |
150000 |
Construction of Concrete road from Garls high Madrasah to Abhijan Sangho Club1 |
Plinth level |
-
latitude : 24.689705,24.68770170584321
Longitude : 87.9375318,87.93887291103601
file name : Image_13092021153831132.png
|
2021-09-13 15:38:31.208228 |
117 |
34954591 |
Construction of Concrete road from Garls high Madrasah to Abhijan Sangho Club |
150000 |
Construction of Concrete road from Garls high Madrasah to Abhijan Sangho Club1 |
Completion of work |
-
latitude : 24.689285,24.6881859
Longitude : 87.9376001,87.9373574
file name : Image_25082021114654918.png
|
2021-08-25 11:46:55.002137 |
118 |
34949378 |
Construction of Concrete road from the house of Bablu to Tajamul |
150000 |
Construction of Concrete road from the house of Bablu to Tajamul 1 |
Roof laid |
-
latitude : 24.687287346459925,24.687145608477294
Longitude : 87.94088440015912,87.94144045561552
file name : Image_08092021113216941.png
|
2021-09-08 11:32:17.020555 |
119 |
34949378 |
Construction of Concrete road from the house of Bablu to Tajamul |
150000 |
Construction of Concrete road from the house of Bablu to Tajamul 1 |
Plinth level |
-
latitude : 24.68713886104524,24.6863356
Longitude : 87.94142394326627,87.9412925
file name : Image_02092021115231711.png
|
2021-09-02 11:52:31.795864 |
120 |
34949378 |
Construction of Concrete road from the house of Bablu to Tajamul |
150000 |
Construction of Concrete road from the house of Bablu to Tajamul 1 |
Completion of work |
-
latitude : 24.68713634647429,24.68727716244757
Longitude : 87.94143123552203,87.94093552976847
file name : Image_16082021110709611.png
|
2021-08-16 11:07:09.679506 |
121 |
34948800 |
Construction of Concrete road from the house of Ajijul to Habal |
150000 |
Construction of Concrete road from the house of Ajijul to Habal 1 |
Plinth level |
-
latitude : 24.68485173303634,24.685175232589245
Longitude : 87.93935277499259,87.93899302370846
file name : Image_08092021111905148.png
|
2021-09-08 11:19:05.220241 |
122 |
34948800 |
Construction of Concrete road from the house of Ajijul to Habal |
150000 |
Construction of Concrete road from the house of Ajijul to Habal 1 |
Roof laid |
-
latitude : 24.685282940045,24.6848352,24.6848352,24.6851637493819,24.684912208467722,24.684904203750193
Longitude : 87.93904289603233,87.9400671,87.9400671,87.93900492601097,87.93893024325371,87.93931346386671
file name : Image_08092021112552324.png
|
2021-09-08 11:25:52.397212 |
123 |
34948800 |
Construction of Concrete road from the house of Ajijul to Habal |
150000 |
Construction of Concrete road from the house of Ajijul to Habal 1 |
Completion of work |
-
latitude : 24.68532836996019,24.684939323924482,24.68488894868642
Longitude : 87.93898690491915,87.9389270581305,87.93925336562097
file name : Image_16082021110704921.png
|
2021-08-16 11:07:04.988 |
124 |
34954219 |
Construction of Concrete road from Main Road to Kali Mandir |
150000 |
Construction of Concrete road from Main Road to Kali Mandir 1 |
Plinth level |
-
latitude : 24.6892554,24.6875554
Longitude : 87.9340364,87.9366247
file name : Image_13092021152458286.png
|
2021-09-13 15:24:58.355465 |
125 |
34954219 |
Construction of Concrete road from Main Road to Kali Mandir |
150000 |
Construction of Concrete road from Main Road to Kali Mandir 1 |
Roof laid |
-
latitude : 24.6875619,24.6875677
Longitude : 87.9366038,87.9366091
file name : Image_13092021152954190.png
|
2021-09-13 15:29:54.263473 |
126 |
34954219 |
Construction of Concrete road from Main Road to Kali Mandir |
150000 |
Construction of Concrete road from Main Road to Kali Mandir 1 |
Completion of work |
-
latitude : 24.6875355,24.687981577590108
Longitude : 87.9365089,87.93602113611996
file name : Image_25082021113429562.png
|
2021-08-25 11:34:29.645177 |
127 |
34955855 |
Construction of Concrete road from Main Road to Garden |
150000 |
Construction of Concrete road from Main Road to Garden1 |
Roof laid |
-
latitude : 24.688349,24.6884728
Longitude : 87.9375332,87.9390005
file name : Image_15022022144454383.png
|
2022-02-15 14:44:54.474642 |
128 |
34955855 |
Construction of Concrete road from Main Road to Garden |
150000 |
Construction of Concrete road from Main Road to Garden1 |
Plinth level |
-
latitude : 24.6896035,24.6887415
Longitude : 87.9376329,87.9386273
file name : Image_13092021154045147.png
|
2021-09-13 15:40:45.224428 |
129 |
34955855 |
Construction of Concrete road from Main Road to Garden |
150000 |
Construction of Concrete road from Main Road to Garden1 |
Completion of work |
-
latitude : 24.689206,24.6887488
Longitude : 87.9375488,87.9385981
file name : Image_25082021112822416.png
|
2021-08-25 11:28:22.494891 |
130 |
34946149 |
Construction of Bathing Ghat infornt of Prabir Chakraborty house beside of Bagmari river |
300000 |
Construction of Bathing Ghat infornt of Prabir Chakraborty house beside of Bagmari river1 |
Plinth level |
-
latitude : 24.6933703
Longitude : 87.9403735
file name : Image_03022022150949119.png
|
2022-02-03 15:09:49.228553 |
131 |
34946149 |
Construction of Bathing Ghat infornt of Prabir Chakraborty house beside of Bagmari river |
300000 |
Construction of Bathing Ghat infornt of Prabir Chakraborty house beside of Bagmari river1 |
Roof laid |
-
latitude : 24.6921195
Longitude : 87.9412597
file name : Image_03022022151237490.png
|
2022-02-03 15:12:37.619114 |
132 |
34946149 |
Construction of Bathing Ghat infornt of Prabir Chakraborty house beside of Bagmari river |
300000 |
Construction of Bathing Ghat infornt of Prabir Chakraborty house beside of Bagmari river1 |
Completion of work |
-
latitude : 24.6918582
Longitude : 87.9411383
file name : Image_18012022120701773.png
|
2022-01-18 12:07:01.833149 |
133 |
34951671 |
Construction of Concrete road from the house of Hasan Mastar to Sultan |
150000 |
Construction of Concrete road from the house of Hasan Mastar to Sultan1 |
Roof laid |
-
latitude : 24.683085791766644,24.68357663601637
Longitude : 87.9376563616097,87.93768536299467
file name : Image_08092021105732603.png
|
2021-09-08 10:57:32.705676 |
134 |
34951671 |
Construction of Concrete road from the house of Hasan Mastar to Sultan |
150000 |
Construction of Concrete road from the house of Hasan Mastar to Sultan1 |
Plinth level |
-
latitude : 24.683191780932248,24.68321898020804
Longitude : 87.93740934692323,87.93736131861806
file name : Image_02092021105648478.png
|
2021-09-02 10:56:48.571419 |
135 |
34951671 |
Construction of Concrete road from the house of Hasan Mastar to Sultan |
150000 |
Construction of Concrete road from the house of Hasan Mastar to Sultan1 |
Completion of work |
-
latitude : 24.683200623840094,24.68347089830786
Longitude : 87.93738855980337,87.93744061142206
file name : Image_16082021110655832.png
|
2021-08-16 11:06:55.903054 |
136 |
34950942 |
Construction of Concrete road from the house of Rekaul to Maharam Ali |
150000 |
Construction of Concrete road from the house of Rekaul to Maharam Ali1 |
Plinth level |
-
latitude : 24.6836652,24.6834205230698
Longitude : 87.939675,87.93893150053918
file name : Image_08092021110526622.png
|
2021-09-08 11:05:26.686645 |
137 |
34950942 |
Construction of Concrete road from the house of Rekaul to Maharam Ali |
150000 |
Construction of Concrete road from the house of Rekaul to Maharam Ali1 |
Roof laid |
-
latitude : 24.6836624,24.68340593855828
Longitude : 87.9396766,87.93895304203033
file name : Image_08092021111010359.png
|
2021-09-08 11:10:10.428755 |
138 |
34950942 |
Construction of Concrete road from the house of Rekaul to Maharam Ali |
150000 |
Construction of Concrete road from the house of Rekaul to Maharam Ali1 |
Completion of work |
-
latitude : 24.6836666,24.6829765
Longitude : 87.9396737,87.9397608
file name : Image_16082021110651579.png
|
2021-08-16 11:06:51.64785 |
139 |
34951239 |
Construction of Concrete road from Moklesur Ramans Garden to the house of Babar Ali |
150000 |
Construction of Concrete road from Moklesur Ramans Garden to the house of Babar Ali 1 |
Completion of work |
-
latitude : 24.6848394,24.684667331166565
Longitude : 87.9403735,87.93910928070545
file name : Image_15092021120837949.png
|
2021-09-15 12:08:38.03195 |
140 |
34951239 |
Construction of Concrete road from Moklesur Ramans Garden to the house of Babar Ali |
150000 |
Construction of Concrete road from Moklesur Ramans Garden to the house of Babar Ali 1 |
Plinth level |
-
latitude : 24.6846206439659,24.684558073058724
Longitude : 87.93925336562097,87.93925093486905
file name : Image_16092021120210181.png
|
2021-09-16 12:02:10.239328 |
141 |
34981418 |
Construction of New Tubwell with platform at Nutan Momrejpur village. |
25000 |
Construction of New Tubwell with platform at Nutan Momrejpur village.1 |
Roof laid |
-
latitude : 24.698321535252035
Longitude : 87.92708150111139
file name : Image_11022022113904383.png
|
2022-02-11 11:39:04.473147 |
142 |
34981418 |
Construction of New Tubwell with platform at Nutan Momrejpur village. |
25000 |
Construction of New Tubwell with platform at Nutan Momrejpur village.1 |
Plinth level |
-
latitude : 24.69828922301531
Longitude : 87.92703196406364
file name : Image_10022021111904065.png
|
2021-02-10 11:19:04.153638 |
143 |
34981418 |
Construction of New Tubwell with platform at Nutan Momrejpur village. |
25000 |
Construction of New Tubwell with platform at Nutan Momrejpur village.1 |
Completion of work |
-
latitude : 24.69831914640963
Longitude : 87.92699181474745
file name : Image_05022021103758378.png
|
2021-02-05 10:37:58.487456 |
144 |
51662746 |
Construction of Concrete drain with cover from the house of Salam to Jakir Godaun at Mahadebnagar v |
200000 |
Construction of Concrete drain with cover from the house of Salam to Jakir Godaun at Mahadebnagar v1 |
Roof laid |
-
latitude : 24.690007106401026,24.690062762238085
Longitude : 87.94164028018713,87.94177740812302
file name : Image_01022022143516997.png
|
2022-02-01 14:35:17.097406 |
145 |
51662746 |
Construction of Concrete drain with cover from the house of Salam to Jakir Godaun at Mahadebnagar v |
200000 |
Construction of Concrete drain with cover from the house of Salam to Jakir Godaun at Mahadebnagar v1 |
Plinth level |
-
latitude : 24.690046794712543,24.69001808669418
Longitude : 87.94165226630867,87.9417295474559
file name : Image_21112021082717356.png
|
2021-11-21 08:27:17.470121 |
146 |
51662746 |
Construction of Concrete drain with cover from the house of Salam to Jakir Godaun at Mahadebnagar v |
200000 |
Construction of Concrete drain with cover from the house of Salam to Jakir Godaun at Mahadebnagar v1 |
Completion of work |
-
latitude : 24.69007001258433,24.690056894905865
Longitude : 87.94138454832137,87.9415244422853
file name : Image_17112021114337582.png
|
2021-11-17 11:43:37.685456 |
147 |
51662464 |
Construction of Concrete road from the house of Sajahan Sk to Jahirul at Momrejpur village |
150000 |
Construction of Concrete road from the house of Sajahan Sk to Jahirul at Momrejpur village1 |
Plinth level |
-
latitude : 24.6944275,24.69440278597176
Longitude : 87.9385025,87.9374935850501
file name : Image_25112021122812139.png
|
2021-11-25 12:28:12.238566 |
148 |
51662464 |
Construction of Concrete road from the house of Sajahan Sk to Jahirul at Momrejpur village |
150000 |
Construction of Concrete road from the house of Sajahan Sk to Jahirul at Momrejpur village1 |
Completion of work |
-
latitude : 24.694460495375097,24.6943547,24.6936079
Longitude : 87.9375287052244,87.9385029,87.938083
file name : Image_19112021104319289.png
|
2021-11-19 10:43:19.367533 |
149 |
51663031 |
Construction of Bathing Ghat infornt of Gaju Sardar house beside of Bagmari river at Ankura village |
250000 |
Construction of Bathing Ghat infornt of Gaju Sardar house beside of Bagmari river at Ankura village1 |
Plinth level |
-
latitude : 24.68593966215849
Longitude : 87.92985859327018
file name : Image_07122021124927728.png
|
2021-12-07 12:49:27.810581 |
150 |
51663031 |
Construction of Bathing Ghat infornt of Gaju Sardar house beside of Bagmari river at Ankura village |
250000 |
Construction of Bathing Ghat infornt of Gaju Sardar house beside of Bagmari river at Ankura village1 |
Plinth level |
-
latitude : 24.685869673267007
Longitude : 87.92979111894965
file name : Image_04122021141436373.png
|
2021-12-04 14:14:36.452932 |
151 |
51663031 |
Construction of Bathing Ghat infornt of Gaju Sardar house beside of Bagmari river at Ankura village |
250000 |
Construction of Bathing Ghat infornt of Gaju Sardar house beside of Bagmari river at Ankura village1 |
Completion of work |
-
latitude : 24.685913301073015
Longitude : 87.92982908897102
file name : Image_20112021160857030.png
|
2021-11-20 16:08:57.105845 |
152 |
51662631 |
Construction of Concrete drain with cover from the house of Dhananjoy Das to Bagmari river at Madhy |
400000 |
Construction of Concrete drain with cover from the house of Dhananjoy Das to Bagmari river at Madhy1 |
Roof laid |
-
latitude : 24.6935323,24.690387351438403
Longitude : 87.9387884,87.93882085941732
file name : Image_25032022153653987.png
|
2022-03-25 15:36:54.062497 |
153 |
51662631 |
Construction of Concrete drain with cover from the house of Dhananjoy Das to Bagmari river at Madhy |
400000 |
Construction of Concrete drain with cover from the house of Dhananjoy Das to Bagmari river at Madhy1 |
Plinth level |
-
latitude : 24.690545769408345,24.690545769408345
Longitude : 87.93884483166039,87.93884483166039
file name : Image_29112021130735817.png
|
2021-11-29 13:07:35.91675 |
154 |
51662631 |
Construction of Concrete drain with cover from the house of Dhananjoy Das to Bagmari river at Madhy |
400000 |
Construction of Concrete drain with cover from the house of Dhananjoy Das to Bagmari river at Madhy1 |
Completion of work |
-
latitude : 24.690316230989993,24.690353237092495
Longitude : 87.93881859630346,87.938809460029
file name : Image_17112021110822972.png
|
2021-11-17 11:08:23.068297 |
155 |
35017951 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village1 |
Plinth level |
-
latitude : 24.69934123568237
Longitude : 87.9280773550272
file name : Image_11022022115510223.png
|
2022-02-11 11:55:10.324507 |
156 |
35017951 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village1 |
Roof laid |
-
latitude : 24.69933624844998
Longitude : 87.92806352488697
file name : Image_11022022115639436.png
|
2022-02-11 11:56:39.533174 |
157 |
35017951 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Madhya Mahadebnagar village1 |
Completion of work |
-
latitude : 24.69932845328003
Longitude : 87.92808012105525
file name : Image_10022021112721334.png
|
2021-02-10 11:27:21.401436 |
158 |
34909441 |
Construction of Bamboo Sakho on bagmari river of pulghat |
70000 |
Construction of Bamboo Sakho on bagmari river of pulghat 1 |
Completion of work |
-
latitude : 24.6779863
Longitude : 87.9240961
file name : Image_13092021132836726.png
|
2021-09-13 13:28:36.831018 |
159 |
34887743 |
Water Harvesting at Mahadebnagar g.p |
50000 |
Water Harvesting at Mahadebnagar g.p1 |
Completion of work |
-
latitude : 24.6887573
Longitude : 87.9386837
file name : Image_22092021123007503.png
|
2021-09-22 12:30:07.609752 |
160 |
51662218 |
Construction of Concrete drain with cover from the house of Safu Sk to Alkesh Sk at Madhya Mahadeb |
300000 |
Construction of Concrete drain with cover from the house of Safu Sk to Alkesh Sk at Madhya Mahadeb1 |
Plinth level |
-
latitude : 24.6875313,24.6882202103734
Longitude : 87.9344398,87.93426772579551
file name : Image_19022022123629362.png
|
2022-02-19 12:36:29.445083 |
161 |
51662218 |
Construction of Concrete drain with cover from the house of Safu Sk to Alkesh Sk at Madhya Mahadeb |
300000 |
Construction of Concrete drain with cover from the house of Safu Sk to Alkesh Sk at Madhya Mahadeb1 |
Roof laid |
-
latitude : 24.688204578123987,24.68821526505053,24.6875313
Longitude : 87.93426705524325,87.93428163975477,87.9344398
file name : Image_19022022124130758.png
|
2022-02-19 12:41:30.843269 |
162 |
51662218 |
Construction of Concrete drain with cover from the house of Safu Sk to Alkesh Sk at Madhya Mahadeb |
300000 |
Construction of Concrete drain with cover from the house of Safu Sk to Alkesh Sk at Madhya Mahadeb1 |
Completion of work |
-
latitude : 24.68840930610895,24.688368318602443
Longitude : 87.93443175964057,87.93438540771604
file name : Image_01122021095705890.png
|
2021-12-01 09:57:06.005014 |
163 |
51662286 |
Construction of Concrete road from the house of Baloram Das to Umed Sk at Madhya Mahadebnagar |
150000 |
Construction of Concrete road from the house of Baloram Das to Umed Sk at Madhya Mahadebnagar 1 |
Roof laid |
-
latitude : 24.689321047626436,24.6888982
Longitude : 87.93674005195498,87.9352109
file name : Image_19022022124600842.png
|
2022-02-19 12:46:00.934711 |
164 |
51662286 |
Construction of Concrete road from the house of Baloram Das to Umed Sk at Madhya Mahadebnagar |
150000 |
Construction of Concrete road from the house of Baloram Das to Umed Sk at Madhya Mahadebnagar 1 |
Plinth level |
-
latitude : 24.689513999037445,24.689494846388698
Longitude : 87.93686846271157,87.93686142191291
file name : Image_21112021110347761.png
|
2021-11-21 11:03:47.824237 |
165 |
51662286 |
Construction of Concrete road from the house of Baloram Das to Umed Sk at Madhya Mahadebnagar |
150000 |
Construction of Concrete road from the house of Baloram Das to Umed Sk at Madhya Mahadebnagar 1 |
Completion of work |
-
latitude : 24.6880776,24.689459893852472
Longitude : 87.9365272,87.93682236224413
file name : Image_18112021123443545.png
|
2021-11-18 12:34:43.647761 |
166 |
51662813 |
Construction of Concrete road from the house of Anesur Dr to Jeker at Nishindrapara village |
100000 |
Construction of Concrete road from the house of Anesur Dr to Jeker at Nishindrapara village1 |
Roof laid |
-
latitude : 24.6831081,24.6831081
Longitude : 87.9350748,87.9350748
file name : Image_20012022150339354.png
|
2022-01-20 15:03:39.447003 |
167 |
51662813 |
Construction of Concrete road from the house of Anesur Dr to Jeker at Nishindrapara village |
100000 |
Construction of Concrete road from the house of Anesur Dr to Jeker at Nishindrapara village1 |
Plinth level |
-
latitude : 24.6831893,24.6831893
Longitude : 87.9350836,87.9350836
file name : Image_05122021083955595.png
|
2021-12-05 08:39:55.691567 |
168 |
51662813 |
Construction of Concrete road from the house of Anesur Dr to Jeker at Nishindrapara village |
100000 |
Construction of Concrete road from the house of Anesur Dr to Jeker at Nishindrapara village1 |
Completion of work |
-
latitude : 24.683119151741266,24.68310758471489
Longitude : 87.93527430854738,87.93521454557776
file name : Image_18112021115952895.png
|
2021-11-18 11:59:53.003981 |
169 |
51662844 |
Construction of Concrete drain with cover from the house of Hazrat Sk to Asraf Marchent at Nishindr |
200000 |
Construction of Concrete drain with cover from the house of Hazrat Sk to Asraf Marchent at Nishindr1 |
Roof laid |
-
latitude : 24.6830969,24.6830969
Longitude : 87.935079,87.935079
file name : Image_20012022150448837.png
|
2022-01-20 15:04:48.894894 |
170 |
51662844 |
Construction of Concrete drain with cover from the house of Hazrat Sk to Asraf Marchent at Nishindr |
200000 |
Construction of Concrete drain with cover from the house of Hazrat Sk to Asraf Marchent at Nishindr1 |
Plinth level |
-
latitude : 24.68319,24.68319
Longitude : 87.9350838,87.9350838
file name : Image_05122021084215245.png
|
2021-12-05 08:42:15.341973 |
171 |
51662844 |
Construction of Concrete drain with cover from the house of Hazrat Sk to Asraf Marchent at Nishindr |
200000 |
Construction of Concrete drain with cover from the house of Hazrat Sk to Asraf Marchent at Nishindr1 |
Completion of work |
-
latitude : 24.683094508945942,24.68310150783509
Longitude : 87.93523223139346,87.93503324501216
file name : Image_18112021115319975.png
|
2021-11-18 11:53:20.097649 |
172 |
51662677 |
Construction of Concrete road from the house of Gaffar to Setab Sk at Mahadebnagar village |
200000 |
Construction of Concrete road from the house of Gaffar to Setab Sk at Mahadebnagar village1 |
Plinth level |
-
latitude : 24.6892743,24.6891631
Longitude : 87.9375967,87.937482
file name : Image_20112021154923735.png
|
2021-11-20 15:49:23.826238 |
173 |
51662677 |
Construction of Concrete road from the house of Gaffar to Setab Sk at Mahadebnagar village |
200000 |
Construction of Concrete road from the house of Gaffar to Setab Sk at Mahadebnagar village1 |
Plinth level |
-
latitude : 24.6893476,24.689359
Longitude : 87.9376075,87.9376479
file name : Image_20112021091231126.png
|
2021-11-20 09:12:31.198302 |
174 |
51662677 |
Construction of Concrete road from the house of Gaffar to Setab Sk at Mahadebnagar village |
200000 |
Construction of Concrete road from the house of Gaffar to Setab Sk at Mahadebnagar village1 |
Completion of work |
-
latitude : 24.6889453,24.68900869600475
Longitude : 87.9375978,87.93962250463665
file name : Image_17112021110555664.png
|
2021-11-17 11:05:55.802156 |
175 |
53352272 |
Construction of Pacca Drain with Cover Slabe from the house of Mostafa to Kawsar House at Gopalnagar |
300000 |
Construction of Pacca Drain with Cover Slabe from the house of Mostafa to Kawsar House at Gopalnagar1 |
Roof laid |
-
latitude : 24.696250115521252,24.696223293431103
Longitude : 87.92892845347524,87.92863760143518
file name : Image_08042022153520172.png
|
2022-04-08 15:35:20.268037 |
176 |
53352272 |
Construction of Pacca Drain with Cover Slabe from the house of Mostafa to Kawsar House at Gopalnagar |
300000 |
Construction of Pacca Drain with Cover Slabe from the house of Mostafa to Kawsar House at Gopalnagar1 |
Plinth level |
-
latitude : 24.696237416937947,24.696237416937947
Longitude : 87.92897069826722,87.92897069826722
file name : Image_14122021101803039.png
|
2021-12-14 10:18:03.124305 |
177 |
53352272 |
Construction of Pacca Drain with Cover Slabe from the house of Mostafa to Kawsar House at Gopalnagar |
300000 |
Construction of Pacca Drain with Cover Slabe from the house of Mostafa to Kawsar House at Gopalnagar1 |
Completion of work |
-
latitude : 24.696257784962654,24.696256737224758
Longitude : 87.92921151034534,87.92922299355268
file name : Image_20112021164556461.png
|
2021-11-20 16:45:56.5633 |
178 |
53352400 |
Construction of Pacca Drain with Cover Slabe from the house of Sadek to Bagmari River at Par Ankura |
350000 |
Construction of Pacca Drain with Cover Slabe from the house of Sadek to Bagmari River at Par Ankura 1 |
Roof laid |
-
latitude : 24.686218444257975,24.68633239623159,24.686523503623903,24.686565957963467,24.68661662656814,24.687272384762764
Longitude : 87.92913858778775,87.92922182008624,87.92889752425253,87.92886240407825,87.92874899692833,87.92910690419376
file name : Image_08042022105902075.png
|
2022-04-08 10:59:02.175033 |
179 |
53352400 |
Construction of Pacca Drain with Cover Slabe from the house of Sadek to Bagmari River at Par Ankura |
350000 |
Construction of Pacca Drain with Cover Slabe from the house of Sadek to Bagmari River at Par Ankura 1 |
Plinth level |
-
latitude : 24.6887645,24.6887645,24.686679616570473,24.686680370941758
Longitude : 87.9387842,87.9387842,87.92880867607892,87.92880725115538
file name : Image_16122021144047285.png
|
2021-12-16 14:40:47.367739 |
180 |
53352400 |
Construction of Pacca Drain with Cover Slabe from the house of Sadek to Bagmari River at Par Ankura |
350000 |
Construction of Pacca Drain with Cover Slabe from the house of Sadek to Bagmari River at Par Ankura 1 |
Completion of work |
-
latitude : 24.688847260549664,24.688862431794405
Longitude : 87.92969942092896,87.92974996380508
file name : Image_21112021115743980.png
|
2021-11-21 11:57:44.082172 |
181 |
51662396 |
Construction of Concrete drain with cover from the house of Mojaharul Mastar to Jalal at Nutan Mom |
400000 |
Construction of Concrete drain with cover from the house of Mojaharul Mastar to Jalal at Nutan Mom1 |
Roof laid |
-
latitude : 24.698778768070042,24.69892528373748
Longitude : 87.92556705884635,87.92565431445837
file name : Image_11022022113525208.png
|
2022-02-11 11:35:25.296278 |
182 |
51662396 |
Construction of Concrete drain with cover from the house of Mojaharul Mastar to Jalal at Nutan Mom |
400000 |
Construction of Concrete drain with cover from the house of Mojaharul Mastar to Jalal at Nutan Mom1 |
Plinth level |
-
latitude : 24.698675628751516,24.69867206644267
Longitude : 87.92653986252844,87.92652762494981
file name : Image_25112021120200014.png
|
2021-11-25 12:02:00.099363 |
183 |
51662396 |
Construction of Concrete drain with cover from the house of Mojaharul Mastar to Jalal at Nutan Mom |
400000 |
Construction of Concrete drain with cover from the house of Mojaharul Mastar to Jalal at Nutan Mom1 |
Completion of work |
-
latitude : 24.698640634305775,24.698640634305775
Longitude : 87.92661781422794,87.92661781422794
file name : Image_21112021121624653.png
|
2021-11-21 12:16:24.757716 |
184 |
53351959 |
Construction of Pacca Drain with Cover Slabe from the house of Bholu Momin to Didarul House at Uttar |
350000 |
Construction of Pacca Drain with Cover Slabe from the house of Bholu Momin to Didarul House at Uttar1 |
Roof laid |
-
latitude : 24.691958,24.6921213
Longitude : 87.9450221,87.9451184
file name : Image_25032022151840255.png
|
2022-03-25 15:18:40.333228 |
185 |
53351959 |
Construction of Pacca Drain with Cover Slabe from the house of Bholu Momin to Didarul House at Uttar |
350000 |
Construction of Pacca Drain with Cover Slabe from the house of Bholu Momin to Didarul House at Uttar1 |
Plinth level |
-
latitude : 24.692133679054677,24.692133679054677
Longitude : 87.94362226501107,87.94362226501107
file name : Image_02122021150132502.png
|
2021-12-02 15:01:32.599306 |
186 |
53351959 |
Construction of Pacca Drain with Cover Slabe from the house of Bholu Momin to Didarul House at Uttar |
350000 |
Construction of Pacca Drain with Cover Slabe from the house of Bholu Momin to Didarul House at Uttar1 |
Completion of work |
-
latitude : 24.692155430093408,24.6918396
Longitude : 87.94363416731358,87.94482
file name : Image_21112021080731245.png
|
2021-11-21 08:07:31.347055 |
187 |
51662431 |
Construction of Concrete drain with cover from the house of Mister to Hefu at Nutan Momrejpur vill |
400000 |
Construction of Concrete drain with cover from the house of Mister to Hefu at Nutan Momrejpur vill1 |
Roof laid |
-
latitude : 24.69842408783734,24.698758819140494
Longitude : 87.9255492053926,87.92561550624669
file name : Image_11022022113408098.png
|
2022-02-11 11:34:08.179749 |
188 |
51662431 |
Construction of Concrete drain with cover from the house of Mister to Hefu at Nutan Momrejpur vill |
400000 |
Construction of Concrete drain with cover from the house of Mister to Hefu at Nutan Momrejpur vill1 |
Plinth level |
-
latitude : 24.699420193210244,24.699420193210244
Longitude : 87.92600249871612,87.92600249871612
file name : Image_25112021115147039.png
|
2021-11-25 11:51:47.133237 |
189 |
51662431 |
Construction of Concrete drain with cover from the house of Mister to Hefu at Nutan Momrejpur vill |
400000 |
Construction of Concrete drain with cover from the house of Mister to Hefu at Nutan Momrejpur vill1 |
Completion of work |
-
latitude : 24.6998493,24.6998493
Longitude : 87.925973,87.925973
file name : Image_21112021122047545.png
|
2021-11-21 12:20:47.617303 |
190 |
53351813 |
Construction of Pacca Drain with Cover Slabe from the house of Kashim Momin to Ansarul House at Momr |
350000 |
Construction of Pacca Drain with Cover Slabe from the house of Kashim Momin to Ansarul House at Momr1 |
Roof laid |
-
latitude : 24.6918574,24.692533244378865
Longitude : 87.938229,87.93757170438766
file name : Image_11042022111754777.png
|
2022-04-11 11:17:54.88502 |
191 |
53351813 |
Construction of Pacca Drain with Cover Slabe from the house of Kashim Momin to Ansarul House at Momr |
350000 |
Construction of Pacca Drain with Cover Slabe from the house of Kashim Momin to Ansarul House at Momr1 |
Completion of work |
-
latitude : 24.6935199,24.6935199
Longitude : 87.9380278,87.9380278
file name : Image_12122021131724674.png
|
2021-12-12 13:17:24.745867 |
192 |
53351813 |
Construction of Pacca Drain with Cover Slabe from the house of Kashim Momin to Ansarul House at Momr |
350000 |
Construction of Pacca Drain with Cover Slabe from the house of Kashim Momin to Ansarul House at Momr1 |
Completion of work |
-
latitude : 24.6935117,24.6935113
Longitude : 87.9380503,87.9380378
file name : Image_07122021140937643.png
|
2021-12-07 14:09:37.720228 |
193 |
47656008 |
Sinking Resinking Repairing of Tubwell under Different village under mahadebnagar g.p |
1600000 |
Sinking Resinking Repairing of Tubwell under Different village under mahadebnagar g.p1 |
Completion of work |
-
latitude : 24.6888249
Longitude : 87.9387462
file name : Image_24022022143104007.png
|
2022-02-24 14:31:04.093768 |
194 |
34980555 |
Sinking Resinking Repairing of Tubwell under Different village under mahadebnagar g.p |
1850000 |
Sinking Resinking Repairing of Tubwell under Different village under mahadebnagar g.p1 |
Plinth level |
-
latitude : 24.6888371
Longitude : 87.9387549
file name : Image_24022022144115670.png
|
2022-02-24 14:41:15.749084 |
195 |
34980555 |
Sinking Resinking Repairing of Tubwell under Different village under mahadebnagar g.p |
1850000 |
Sinking Resinking Repairing of Tubwell under Different village under mahadebnagar g.p1 |
Completion of work |
-
latitude : 24.6887544
Longitude : 87.9387107
file name : Image_02072021150458665.png
|
2021-07-02 15:04:58.76965 |
196 |
70847287 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.694834747351706
Longitude : 87.94220538809896
file name : Image_05022024123628956.png
|
2024-02-05 12:36:29.162781 |
197 |
70847287 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.694767482578754
Longitude : 87.94213321991265
file name : Image_08012024111714728.png
|
2024-01-08 11:17:14.838144 |
198 |
70929622 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.6877523
Longitude : 87.9363908
file name : Image_19012024122935871.png
|
2024-01-19 12:29:35.976657 |
199 |
70929622 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.687622748315334
Longitude : 87.934361519292
file name : Image_19012024122617292.png
|
2024-01-19 12:26:17.395997 |
200 |
70929622 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.6880408
Longitude : 87.9376894
file name : Image_04012024112115600.png
|
2024-01-04 11:21:15.692858 |
201 |
47843427 |
Maintainance of GP Building Stationary |
400000 |
Maintainance of GP Building Stationary1 |
Completion of work |
-
latitude : 24.688721699640155
Longitude : 87.93865372426808
file name : Image_21032022160624946.png
|
2022-03-21 16:06:25.031248 |
202 |
35033320 |
Construction of New Tubwell with platform at Ankura village |
25000 |
Construction of New Tubwell with platform at Ankura village1 |
Plinth level |
-
latitude : 24.683139100670815
Longitude : 87.93182482011616
file name : Image_25032022162420117.png
|
2022-03-25 16:24:20.196793 |
203 |
35033320 |
Construction of New Tubwell with platform at Ankura village |
25000 |
Construction of New Tubwell with platform at Ankura village1 |
Roof laid |
-
latitude : 24.6832343
Longitude : 87.9314886
file name : Image_25032022162543186.png
|
2022-03-25 16:25:43.288089 |
204 |
35033320 |
Construction of New Tubwell with platform at Ankura village |
25000 |
Construction of New Tubwell with platform at Ankura village1 |
Completion of work |
-
latitude : 24.6828592
Longitude : 87.9311822
file name : Image_10022021121037771.png
|
2021-02-10 12:10:37.83609 |
205 |
51662139 |
Construction of Concrete drain with cover from the house of Abdul Latif to Sajahan house at Momrejp |
250000 |
Construction of Concrete drain with cover from the house of Abdul Latif to Sajahan house at Momrejp1 |
Plinth level |
-
latitude : 24.6922534,24.6922534
Longitude : 87.9400671,87.9400671
file name : Image_11042022112307653.png
|
2022-04-11 11:23:07.794428 |
206 |
51662139 |
Construction of Concrete drain with cover from the house of Abdul Latif to Sajahan house at Momrejp |
250000 |
Construction of Concrete drain with cover from the house of Abdul Latif to Sajahan house at Momrejp1 |
Roof laid |
-
latitude : 24.69276609364897,24.692974844947457
Longitude : 87.93971470557153,87.93995392508805
file name : Image_11042022112711961.png
|
2022-04-11 11:27:12.035575 |
207 |
51662139 |
Construction of Concrete drain with cover from the house of Abdul Latif to Sajahan house at Momrejp |
250000 |
Construction of Concrete drain with cover from the house of Abdul Latif to Sajahan house at Momrejp1 |
Plinth level |
-
latitude : 24.69273705035448,24.692737720906734
Longitude : 87.9397111851722,87.93975007720292
file name : Image_07122021124924146.png
|
2021-12-07 12:49:24.232955 |
208 |
51662139 |
Construction of Concrete drain with cover from the house of Abdul Latif to Sajahan house at Momrejp |
250000 |
Construction of Concrete drain with cover from the house of Abdul Latif to Sajahan house at Momrejp1 |
Completion of work |
-
latitude : 24.692678418941796,24.6930042
Longitude : 87.93971043080091,87.9402804
file name : Image_19112021105540470.png
|
2021-11-19 10:55:40.566063 |
209 |
35007871 |
Construction of New Tubwell with platform at Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Mahadebnagar village1 |
Roof laid |
-
latitude : 24.6887415
Longitude : 87.9410701
file name : Image_17022022124731998.png
|
2022-02-17 12:47:32.101147 |
210 |
35007871 |
Construction of New Tubwell with platform at Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Mahadebnagar village1 |
Plinth level |
-
latitude : 24.688410689122975
Longitude : 87.9409287404269
file name : Image_25032021155334655.png
|
2021-03-25 15:53:34.747936 |
211 |
35007871 |
Construction of New Tubwell with platform at Mahadebnagar village |
25000 |
Construction of New Tubwell with platform at Mahadebnagar village1 |
Completion of work |
-
latitude : 24.688348076306283
Longitude : 87.94091708958149
file name : Image_11022021131536836.png
|
2021-02-11 13:15:36.910092 |
212 |
47841550 |
Construction of Concrete road from Rubel Sk house to Sujit Mandal house at Per Ankura village |
300000 |
Construction of Concrete road from Rubel Sk house to Sujit Mandal house at Per Ankura village1 |
Completion of work |
-
latitude : 24.67972410377115,24.679751847870648
Longitude : 87.92578146792948,87.925830418244
file name : Image_20072022110741005.png
|
2022-07-20 11:07:41.075178 |
213 |
47840522 |
Construction of Concrete road from Sudhir house to Umed house at Madhya Mahadebnagar village |
200000 |
Construction of Concrete road from Sudhir house to Umed house at Madhya Mahadebnagar village1 |
Completion of work |
-
latitude : 24.689480806700885,24.689460983499885
Longitude : 87.9368101246655,87.9367945343256
file name : Image_21062022131350723.png
|
2022-06-21 13:13:50.786285 |
214 |
47647696 |
Construction of Concrete drain with cover from Manarul house to Jekat Ali house at Dakhin Mahadebn |
320000 |
Construction of Concrete drain with cover from Manarul house to Jekat Ali house at Dakhin Mahadebn1 |
Plinth level |
-
latitude : 24.683307828381658,24.683328992687166
Longitude : 87.939314218238,87.93930726125836
file name : Image_22062022121254906.png
|
2022-06-22 12:12:54.9732 |
215 |
47647696 |
Construction of Concrete drain with cover from Manarul house to Jekat Ali house at Dakhin Mahadebn |
320000 |
Construction of Concrete drain with cover from Manarul house to Jekat Ali house at Dakhin Mahadebn1 |
Completion of work |
-
latitude : 24.6836096,24.68329454306513
Longitude : 87.9396664,87.93925328180194
file name : Image_15062022131930859.png
|
2022-06-15 13:19:30.92716 |
216 |
47841885 |
Construction of Concrete road from Rafik house to Rail line at Nishindrapara village |
200000 |
Construction of Concrete road from Rafik house to Rail line at Nishindrapara village1 |
Plinth level |
-
latitude : 24.68707230873406,24.687068536877632
Longitude : 87.9353700298816,87.93537153862417
file name : Image_25062022141207927.png
|
2022-06-25 14:12:07.997375 |
217 |
47841885 |
Construction of Concrete road from Rafik house to Rail line at Nishindrapara village |
200000 |
Construction of Concrete road from Rafik house to Rail line at Nishindrapara village1 |
Completion of work |
-
latitude : 24.6876096,24.687107848003507
Longitude : 87.9367105,87.935447730124
file name : Image_21062022141735104.png
|
2022-06-21 14:17:35.227034 |
218 |
47841718 |
Construction of Concrete road from Babul Sk house to Arsad Sk house at Nishindrapara village |
275000 |
Construction of Concrete road from Babul Sk house to Arsad Sk house at Nishindrapara village1 |
Plinth level |
-
latitude : 24.68711086548865,24.687081654556096
Longitude : 87.93539534322917,87.93543993495405
file name : Image_25062022114550808.png
|
2022-06-25 11:45:50.883665 |
219 |
47841718 |
Construction of Concrete road from Babul Sk house to Arsad Sk house at Nishindrapara village |
275000 |
Construction of Concrete road from Babul Sk house to Arsad Sk house at Nishindrapara village1 |
Completion of work |
-
latitude : 24.6876096,24.687150344252586
Longitude : 87.9367105,87.93526072986424
file name : Image_21062022135359824.png
|
2022-06-21 13:53:59.91243 |
220 |
47839321 |
Construction of Concrete road from Abu Taher house to Madrasha Faijul Ulum at Dakhin Mahadebnagar vi |
150000 |
Construction of Concrete road from Abu Taher house to Madrasha Faijul Ulum at Dakhin Mahadebnagar vi1 |
Roof laid |
-
latitude : 24.686751030385494,24.6859522
Longitude : 87.94059245847166,87.9403735
file name : Image_04072022180631075.png
|
2022-07-04 18:06:31.136757 |
221 |
47839321 |
Construction of Concrete road from Abu Taher house to Madrasha Faijul Ulum at Dakhin Mahadebnagar vi |
150000 |
Construction of Concrete road from Abu Taher house to Madrasha Faijul Ulum at Dakhin Mahadebnagar vi1 |
Plinth level |
-
latitude : 24.686726974323392,24.686727644875646
Longitude : 87.94059723615646,87.94055071659386
file name : Image_24062022182936327.png
|
2022-06-24 18:29:36.39766 |
222 |
47839321 |
Construction of Concrete road from Abu Taher house to Madrasha Faijul Ulum at Dakhin Mahadebnagar vi |
150000 |
Construction of Concrete road from Abu Taher house to Madrasha Faijul Ulum at Dakhin Mahadebnagar vi1 |
Completion of work |
-
latitude : 24.68669935595244,24.686747970990837
Longitude : 87.94050889089704,87.94053914956748
file name : Image_17062022130234702.png
|
2022-06-17 13:02:34.798969 |
223 |
47836792 |
Construction of Concrete road from the house of Soibur house to Main Road at Natun Momrejpur village |
250000 |
Construction of Concrete road from the house of Soibur house to Main Road at Natun Momrejpur village1 |
Plinth level |
-
latitude : 24.698731284588575,24.698731284588575
Longitude : 87.92687765322626,87.92687765322626
file name : Image_27062022140258359.png
|
2022-06-27 14:02:58.436578 |
224 |
47836792 |
Construction of Concrete road from the house of Soibur house to Main Road at Natun Momrejpur village |
250000 |
Construction of Concrete road from the house of Soibur house to Main Road at Natun Momrejpur village1 |
Completion of work |
-
latitude : 24.698678981512785,24.698744025081396
Longitude : 87.92693573981524,87.92698997072875
file name : Image_15062022131736366.png
|
2022-06-15 13:17:36.432687 |
225 |
47653386 |
Construction of Concrete drain with cover from Tarikul house to Jahir Abbas house at Uttar Mahadeb |
300000 |
Construction of Concrete drain with cover from Tarikul house to Jahir Abbas house at Uttar Mahadeb1 |
Plinth level |
-
latitude : 24.692346998490393,24.6926536
Longitude : 87.94224847108126,87.9422115
file name : Image_29062022104803100.png
|
2022-06-29 10:48:03.19036 |
226 |
47653386 |
Construction of Concrete drain with cover from Tarikul house to Jahir Abbas house at Uttar Mahadeb |
300000 |
Construction of Concrete drain with cover from Tarikul house to Jahir Abbas house at Uttar Mahadeb1 |
Completion of work |
-
latitude : 24.692375203594565,24.692375203594565
Longitude : 87.94216834008694,87.94216834008694
file name : Image_21062022123910196.png
|
2022-06-21 12:39:10.285262 |
227 |
47643827 |
Construction of Concrete drain with cover from the house of Kasim Momin house to Ansarul houe at M |
340000 |
Construction of Concrete drain with cover from the house of Kasim Momin house to Ansarul houe at M1 |
Plinth level |
-
latitude : 24.693515,24.6935213
Longitude : 87.9380543,87.9380443
file name : Image_29062022124559304.png
|
2022-06-29 12:45:59.390964 |
228 |
47643827 |
Construction of Concrete drain with cover from the house of Kasim Momin house to Ansarul houe at M |
340000 |
Construction of Concrete drain with cover from the house of Kasim Momin house to Ansarul houe at M1 |
Completion of work |
-
latitude : 24.68881926499307,24.6934732
Longitude : 87.93869680725038,87.93809
file name : Image_21062022151749619.png
|
2022-06-21 15:17:49.700511 |
229 |
47844119 |
BIO- Diversity of Mahadebnagar G.P |
50000 |
BIO- Diversity of Mahadebnagar G.P2 |
Completion of work |
-
latitude : 24.6888029
Longitude : 87.9387022
file name : Image_05072022152227730.png
|
2022-07-05 15:22:27.801505 |
230 |
47651608 |
Construction of Concrete drain with cover from Baloram Pal house to Sukumar pal house at Madhya Ma |
200000 |
Construction of Concrete drain with cover from Baloram Pal house to Sukumar pal house at Madhya Ma1 |
Roof laid |
-
latitude : 24.6916713,24.690744085237384
Longitude : 87.9408893,87.93950876221061
file name : Image_18072022113139240.png
|
2022-07-18 11:31:39.321787 |
231 |
47651608 |
Construction of Concrete drain with cover from Baloram Pal house to Sukumar pal house at Madhya Ma |
200000 |
Construction of Concrete drain with cover from Baloram Pal house to Sukumar pal house at Madhya Ma1 |
Plinth level |
-
latitude : 24.690735703334212,24.690735703334212
Longitude : 87.93954664841294,87.93954664841294
file name : Image_02072022115854016.png
|
2022-07-02 11:58:54.102435 |
232 |
47651608 |
Construction of Concrete drain with cover from Baloram Pal house to Sukumar pal house at Madhya Ma |
200000 |
Construction of Concrete drain with cover from Baloram Pal house to Sukumar pal house at Madhya Ma1 |
Completion of work |
-
latitude : 24.690736206248403,24.690777948126197
Longitude : 87.93956525623798,87.93959375470877
file name : Image_21062022122834357.png
|
2022-06-21 12:28:34.451361 |
233 |
47647102 |
Construction of Concrete drain with cover from Sohorab Ali house to Morsalim house at Madhya Mahad |
300000 |
Construction of Concrete drain with cover from Sohorab Ali house to Morsalim house at Madhya Mahad1 |
Plinth level |
-
latitude : 24.69136329833418,24.6908158
Longitude : 87.94252163730562,87.9434368
file name : Image_06072022170732104.png
|
2022-07-06 17:07:32.184308 |
234 |
47647102 |
Construction of Concrete drain with cover from Sohorab Ali house to Morsalim house at Madhya Mahad |
300000 |
Construction of Concrete drain with cover from Sohorab Ali house to Morsalim house at Madhya Mahad1 |
Completion of work |
-
latitude : 24.689834816381335,24.6904944
Longitude : 87.94235919602215,87.9422275
file name : Image_29062022114119136.png
|
2022-06-29 11:41:19.225566 |
235 |
47839919 |
Construction of Concrete road from Nur Main road to Suvan Sk house at Madhya Mahadebnagar village |
150000 |
Construction of Concrete road from Nur Main road to Suvan Sk house at Madhya Mahadebnagar village1 |
Completion of work |
-
latitude : 24.688340239226818,24.688316392712295
Longitude : 87.93607310391963,87.93611199595034
file name : Image_04072022173801029.png
|
2022-07-04 17:38:01.117951 |
236 |
47840696 |
Construction of Concrete road from Asraful house to Khalek house at Madhya Mahadebnagar village |
150000 |
Construction of Concrete road from Asraful house to Khalek house at Madhya Mahadebnagar village1 |
Plinth level |
-
latitude : 24.688785,24.688785
Longitude : 87.9376171,87.9376171
file name : Image_29062022152338820.png
|
2022-06-29 15:23:38.906037 |
237 |
47840696 |
Construction of Concrete road from Asraful house to Khalek house at Madhya Mahadebnagar village |
150000 |
Construction of Concrete road from Asraful house to Khalek house at Madhya Mahadebnagar village1 |
Completion of work |
-
latitude : 24.6881442,24.6887945
Longitude : 87.9379226,87.9375732
file name : Image_21062022131015311.png
|
2022-06-21 13:10:15.377537 |
238 |
47839116 |
Construction of Concrete road from Asraful house to Sajenur house at Dakhin Mahadebnagar village |
150000 |
Construction of Concrete road from Asraful house to Sajenur house at Dakhin Mahadebnagar village1 |
Completion of work |
-
latitude : 24.685692,24.6856921
Longitude : 87.9405338,87.9405357
file name : Image_14072022104142665.png
|
2022-07-14 10:41:42.749388 |
239 |
47652238 |
Construction of Concrete drain with cover from Kartik Pal house to Bagmari river at Madhya Mahadeb |
100000 |
Construction of Concrete drain with cover from Kartik Pal house to Bagmari river at Madhya Mahadeb1 |
Plinth level |
-
latitude : 24.6911407,24.6911407
Longitude : 87.9400671,87.9400671
file name : Image_14072022121752652.png
|
2022-07-14 12:17:52.725963 |
240 |
47652238 |
Construction of Concrete drain with cover from Kartik Pal house to Bagmari river at Madhya Mahadeb |
100000 |
Construction of Concrete drain with cover from Kartik Pal house to Bagmari river at Madhya Mahadeb1 |
Completion of work |
-
latitude : 24.691676,24.691676
Longitude : 87.9408995,87.9408995
file name : Image_14072022121238606.png
|
2022-07-14 12:12:38.68324 |
241 |
47653107 |
Construction of Concrete drain with cover from Hara Khalifa house to Muntu Nadap house at Uttar Ma |
300000 |
Construction of Concrete drain with cover from Hara Khalifa house to Muntu Nadap house at Uttar Ma1 |
Plinth level |
-
latitude : 24.6922952,24.692123788408935
Longitude : 87.9431305,87.94272372499108
file name : Image_06072022113251079.png
|
2022-07-06 11:32:51.164469 |
242 |
47653107 |
Construction of Concrete drain with cover from Hara Khalifa house to Muntu Nadap house at Uttar Ma |
300000 |
Construction of Concrete drain with cover from Hara Khalifa house to Muntu Nadap house at Uttar Ma1 |
Completion of work |
-
latitude : 24.692292055115104,24.692292055115104
Longitude : 87.94268449768424,87.94268449768424
file name : Image_22062022113655677.png
|
2022-06-22 11:36:55.778181 |
243 |
47839772 |
Construction of Concrete road from Nur Main road to Kali Mandir at Madhya Mahadebnagar village |
150000 |
Construction of Concrete road from Nur Main road to Kali Mandir at Madhya Mahadebnagar village1 |
Completion of work |
-
latitude : 24.688102989457548,24.68813148792833
Longitude : 87.93604779057205,87.93603245168924
file name : Image_04072022173503274.png
|
2022-07-04 17:35:03.407484 |
244 |
47644508 |
Construction of Concrete drain with cover from Rafik Shop to Bagmari river at Per Momrejpur village |
300000 |
Construction of Concrete drain with cover from Rafik Shop to Bagmari river at Per Momrejpur village1 |
Roof laid |
-
latitude : 24.690900407731533,24.690900407731533
Longitude : 87.93969291262329,87.93969291262329
file name : Image_22072022140039079.png
|
2022-07-22 14:00:39.158084 |
245 |
47644508 |
Construction of Concrete drain with cover from Rafik Shop to Bagmari river at Per Momrejpur village |
300000 |
Construction of Concrete drain with cover from Rafik Shop to Bagmari river at Per Momrejpur village1 |
Plinth level |
-
latitude : 24.691064483486116,24.6911491
Longitude : 87.93976013548672,87.9406798
file name : Image_18072022113712204.png
|
2022-07-18 11:37:12.290674 |
246 |
47644508 |
Construction of Concrete drain with cover from Rafik Shop to Bagmari river at Per Momrejpur village |
300000 |
Construction of Concrete drain with cover from Rafik Shop to Bagmari river at Per Momrejpur village1 |
Completion of work |
-
latitude : 24.690873962827027,24.69094688538462
Longitude : 87.93963893316686,87.93967598117888
file name : Image_14072022121928244.png
|
2022-07-14 12:19:28.319526 |
247 |
47652629 |
Construction of Concrete drain with cover from Sahida house to Alkesh house at Madhya Mahadebnagar |
350000 |
Construction of Concrete drain with cover from Sahida house to Alkesh house at Madhya Mahadebnagar1 |
Roof laid |
-
latitude : 24.6886249,24.6885994,24.689949438907206
Longitude : 87.9376449,87.9376213,87.93708345852792
file name : Image_02012023151032111.png
|
2023-01-02 15:10:32.186329 |
248 |
47652629 |
Construction of Concrete drain with cover from Sahida house to Alkesh house at Madhya Mahadebnagar |
350000 |
Construction of Concrete drain with cover from Sahida house to Alkesh house at Madhya Mahadebnagar1 |
Plinth level |
-
latitude : 24.6886879,24.6886876
Longitude : 87.9377078,87.9377063
file name : Image_21122022135438303.png
|
2022-12-21 13:54:38.393553 |
249 |
47652629 |
Construction of Concrete drain with cover from Sahida house to Alkesh house at Madhya Mahadebnagar |
350000 |
Construction of Concrete drain with cover from Sahida house to Alkesh house at Madhya Mahadebnagar1 |
Completion of work |
-
latitude : 24.6880596,24.6880597
Longitude : 87.9375462,87.9375498
file name : Image_30112022095633226.png
|
2022-11-30 09:56:33.320417 |
250 |
47836449 |
Construction of Concrete road from the house of Moktarul house to Faruk house at Tarapur village |
198000 |
Construction of Concrete road from the house of Moktarul house to Faruk house at Tarapur village1 |
Plinth level |
-
latitude : 24.7081491,24.7081491
Longitude : 87.9189486,87.9189486
file name : Image_22122022122309069.png
|
2022-12-22 12:23:09.142541 |
251 |
47836449 |
Construction of Concrete road from the house of Moktarul house to Faruk house at Tarapur village |
198000 |
Construction of Concrete road from the house of Moktarul house to Faruk house at Tarapur village1 |
Completion of work |
-
latitude : 24.7081507,24.7081513
Longitude : 87.9190444,87.9190445
file name : Image_20072022112523050.png
|
2022-07-20 11:25:23.133871 |
252 |
47835987 |
Construction of Concrete road from the house of Abdur Rahaman house to Rahima house at Tarapur villa |
100000 |
Construction of Concrete road from the house of Abdur Rahaman house to Rahima house at Tarapur villa1 |
Plinth level |
-
latitude : 24.7081491,24.7081492
Longitude : 87.9189484,87.9189484
file name : Image_22122022122918953.png
|
2022-12-22 12:29:19.026397 |
253 |
47835987 |
Construction of Concrete road from the house of Abdur Rahaman house to Rahima house at Tarapur villa |
100000 |
Construction of Concrete road from the house of Abdur Rahaman house to Rahima house at Tarapur villa1 |
Completion of work |
-
latitude : 24.7081617,24.708161
Longitude : 87.9189482,87.9189478
file name : Image_29112022164809149.png
|
2022-11-29 16:48:09.237948 |
254 |
47842713 |
Construction of Bathing Ghat infornt of Saptam Sardar house beside of Bagmari river at Ankura villag |
282000 |
Construction of Bathing Ghat infornt of Saptam Sardar house beside of Bagmari river at Ankura villag1 |
Roof laid |
-
latitude : 24.68590232077986
Longitude : 87.92963228188455
file name : Image_05012023115053914.png
|
2023-01-05 11:50:54.014288 |
255 |
47842713 |
Construction of Bathing Ghat infornt of Saptam Sardar house beside of Bagmari river at Ankura villag |
282000 |
Construction of Bathing Ghat infornt of Saptam Sardar house beside of Bagmari river at Ankura villag1 |
Plinth level |
-
latitude : 24.685995276086032
Longitude : 87.92960235849023
file name : Image_05012023114159527.png
|
2023-01-05 11:41:59.626476 |
256 |
47842713 |
Construction of Bathing Ghat infornt of Saptam Sardar house beside of Bagmari river at Ankura villag |
282000 |
Construction of Bathing Ghat infornt of Saptam Sardar house beside of Bagmari river at Ankura villag1 |
Plinth level |
-
latitude : 24.685995276086032
Longitude : 87.92960235849023
file name : Image_05012023114202764.png
|
2023-01-05 11:42:02.853033 |
257 |
47842713 |
Construction of Bathing Ghat infornt of Saptam Sardar house beside of Bagmari river at Ankura villag |
282000 |
Construction of Bathing Ghat infornt of Saptam Sardar house beside of Bagmari river at Ankura villag1 |
Completion of work |
-
latitude : 24.685874115675688
Longitude : 87.92959255166352
file name : Image_30112022101730161.png
|
2022-11-30 10:17:30.228667 |
258 |
47642561 |
Construction of Concrete drain with cover from the house of Abdul house to Hayat Ali at Natun Momre |
350000 |
Construction of Concrete drain with cover from the house of Abdul house to Hayat Ali at Natun Momre1 |
Plinth level |
-
latitude : 24.698823527432978,24.698805673979223
Longitude : 87.92564207687974,87.9257339425385
file name : Image_10012023120229267.png
|
2023-01-10 12:02:29.3435 |
259 |
47642561 |
Construction of Concrete drain with cover from the house of Abdul house to Hayat Ali at Natun Momre |
350000 |
Construction of Concrete drain with cover from the house of Abdul house to Hayat Ali at Natun Momre1 |
Completion of work |
-
latitude : 24.6990485,24.6990491
Longitude : 87.9263226,87.9263236
file name : Image_30112022090856725.png
|
2022-11-30 09:08:56.787372 |
260 |
47653797 |
Construction of Concrete drain with cover from Najmul house to Aslam house at Gopalnagar village un |
300000 |
Construction of Concrete drain with cover from Najmul house to Aslam house at Gopalnagar village un1 |
Plinth level |
-
latitude : 24.691136442124844,24.691098388284445
Longitude : 87.92904236353934,87.92849686928093
file name : Image_10012023112923141.png
|
2023-01-10 11:29:23.234226 |
261 |
47653797 |
Construction of Concrete drain with cover from Najmul house to Aslam house at Gopalnagar village un |
300000 |
Construction of Concrete drain with cover from Najmul house to Aslam house at Gopalnagar village un1 |
Completion of work |
-
latitude : 24.69104491174221,24.69102395698428
Longitude : 87.92896541766822,87.92901612818241
file name : Image_30112022092041830.png
|
2022-11-30 09:20:41.882744 |
262 |
59459804 |
Construction of Concrete road With Dust filling from the house of Robiul Momin to MainRoad at Momrej |
160000 |
Construction of Concrete road With Dust filling from the house of Robiul Momin to MainRoad at Momrej1 |
Roof laid |
-
latitude : 24.693245915696025,24.693248639814556
Longitude : 87.93908044695854,87.93907248415053
file name : Image_24052023111904499.png
|
2023-05-24 11:19:04.594041 |
263 |
59459804 |
Construction of Concrete road With Dust filling from the house of Robiul Momin to MainRoad at Momrej |
160000 |
Construction of Concrete road With Dust filling from the house of Robiul Momin to MainRoad at Momrej1 |
Plinth level |
-
latitude : 24.69299,24.6931791
Longitude : 87.9389196,87.938927
file name : Image_24052023111557795.png
|
2023-05-24 11:15:57.923838 |
264 |
59459804 |
Construction of Concrete road With Dust filling from the house of Robiul Momin to MainRoad at Momrej |
160000 |
Construction of Concrete road With Dust filling from the house of Robiul Momin to MainRoad at Momrej1 |
Completion of work |
-
latitude : 24.693342810496688,24.6929426
Longitude : 87.9390946123749,87.9389415
file name : Image_27042023115920876.png
|
2023-04-27 11:59:21.24275 |
265 |
59463633 |
Sinking Resinking Repairing of Tubwell under Different village under mahadebnagar g.p |
1750730 |
Sinking Resinking Repairing of Tubwell under Different village under mahadebnagar g.p1 |
Completion of work |
-
latitude : 24.6888429
Longitude : 87.9386643
file name : Image_20022023130105148.png
|
2023-02-20 13:01:05.207129 |
266 |
47648067 |
Construction of Concrete drain with cover from Main road to Habibur Sk house at Madhya Mahadebnaga |
350000 |
Construction of Concrete drain with cover from Main road to Habibur Sk house at Madhya Mahadebnaga1 |
Roof laid |
-
latitude : 24.686261150054634,24.68625855166465
Longitude : 87.93729501776397,87.93733357451856
file name : Image_05042023114126431.png
|
2023-04-05 11:41:26.629804 |
267 |
47648067 |
Construction of Concrete drain with cover from Main road to Habibur Sk house at Madhya Mahadebnaga |
350000 |
Construction of Concrete drain with cover from Main road to Habibur Sk house at Madhya Mahadebnaga1 |
Plinth level |
-
latitude : 24.687001,24.68624195549637
Longitude : 87.9375594,87.93730331584811
file name : Image_13032023113602806.png
|
2023-03-13 11:36:02.87489 |
268 |
47648067 |
Construction of Concrete drain with cover from Main road to Habibur Sk house at Madhya Mahadebnaga |
350000 |
Construction of Concrete drain with cover from Main road to Habibur Sk house at Madhya Mahadebnaga1 |
Completion of work |
-
latitude : 24.686245056800544,24.686253732070327
Longitude : 87.93726559728384,87.93732234276831
file name : Image_03032023153418140.png
|
2023-03-03 15:34:18.227579 |
269 |
59388674 |
Construction of Concrete road With Dust filling from Main Road to Gour Pal house at Ankura village |
160000 |
Construction of Concrete road With Dust filling from Main Road to Gour Pal house at Ankura village 1 |
Plinth level |
-
latitude : 24.6840883,24.6840883
Longitude : 87.9308033,87.9308033
file name : Image_30052023104445722.png
|
2023-05-30 10:44:45.812192 |
270 |
59388674 |
Construction of Concrete road With Dust filling from Main Road to Gour Pal house at Ankura village |
160000 |
Construction of Concrete road With Dust filling from Main Road to Gour Pal house at Ankura village 1 |
Roof laid |
-
latitude : 24.684088,24.6840874
Longitude : 87.930796,87.930801
file name : Image_30052023104909372.png
|
2023-05-30 10:49:09.466591 |
271 |
59388674 |
Construction of Concrete road With Dust filling from Main Road to Gour Pal house at Ankura village |
160000 |
Construction of Concrete road With Dust filling from Main Road to Gour Pal house at Ankura village 1 |
Completion of work |
-
latitude : 24.6841,24.6840998
Longitude : 87.9307753,87.9307751
file name : Image_10052023104819289.png
|
2023-05-10 10:48:19.389668 |
272 |
47654526 |
Construction of Concrete drain with cover from Hajikul house to Rail line at Nishindrapara village |
350000 |
Construction of Concrete drain with cover from Hajikul house to Rail line at Nishindrapara village 1 |
Roof laid |
-
latitude : 24.683893,24.6838908
Longitude : 87.9355347,87.9355407
file name : Image_05042023113340891.png
|
2023-04-05 11:33:40.973836 |
273 |
47654526 |
Construction of Concrete drain with cover from Hajikul house to Rail line at Nishindrapara village |
350000 |
Construction of Concrete drain with cover from Hajikul house to Rail line at Nishindrapara village 1 |
Completion of work |
-
latitude : 24.68385,24.683528188616037
Longitude : 87.9354943,87.9353938344866
file name : Image_30112022094641556.png
|
2022-11-30 09:46:41.629219 |
274 |
47654526 |
Construction of Concrete drain with cover from Hajikul house to Rail line at Nishindrapara village |
350000 |
Construction of Concrete drain with cover from Hajikul house to Rail line at Nishindrapara village 1 |
Plinth level |
-
latitude : 24.683619970455766,24.683596082031727
Longitude : 87.93508479371667,87.9351900704205
file name : Image_21032023114651585.png
|
2023-03-21 11:46:51.679348 |
275 |
59387856 |
Construction of Concrete road With Dust filling from Waktiya Masjid to Tarikul house via Bellal Sk a |
200000 |
Construction of Concrete road With Dust filling from Waktiya Masjid to Tarikul house via Bellal Sk a1 |
Plinth level |
-
latitude : 24.6877689,24.6877002
Longitude : 87.9368677,87.9367401
file name : Image_22052023104600080.png
|
2023-05-22 10:46:00.17903 |
276 |
59387856 |
Construction of Concrete road With Dust filling from Waktiya Masjid to Tarikul house via Bellal Sk a |
200000 |
Construction of Concrete road With Dust filling from Waktiya Masjid to Tarikul house via Bellal Sk a1 |
Roof laid |
-
latitude : 24.687128593213856,24.687120798043907
Longitude : 87.93501757085323,87.93504045344889
file name : Image_22052023104912708.png
|
2023-05-22 10:49:12.807826 |
277 |
59387856 |
Construction of Concrete road With Dust filling from Waktiya Masjid to Tarikul house via Bellal Sk a |
200000 |
Construction of Concrete road With Dust filling from Waktiya Masjid to Tarikul house via Bellal Sk a1 |
Completion of work |
-
latitude : 24.687163000926375,24.68717326875776
Longitude : 87.93507532216609,87.9350536968559
file name : Image_11052023105401995.png
|
2023-05-11 10:54:02.090495 |
278 |
59455550 |
Construction of Concrete road With Dust filling from Ajad house to Sumaiya house at Natun Momrejpur |
100000 |
Construction of Concrete road With Dust filling from Ajad house to Sumaiya house at Natun Momrejpur 1 |
Completion of work |
-
latitude : 24.699159767478704,24.699199204333127
Longitude : 87.92689341120422,87.92699650861323
file name : Image_18042023115650849.png
|
2023-04-18 11:56:50.959805 |
279 |
59455550 |
Construction of Concrete road With Dust filling from Ajad house to Sumaiya house at Natun Momrejpur |
100000 |
Construction of Concrete road With Dust filling from Ajad house to Sumaiya house at Natun Momrejpur 1 |
Completion of work |
-
latitude : 24.699159767478704,24.699199204333127
Longitude : 87.92689341120422,87.92699650861323
file name : Image_18042023115707411.png
|
2023-04-18 11:57:07.521193 |
280 |
59455094 |
Construction of Concrete road With Dust filling from Manjarul house to Main Road at Natun Momrejpur |
100000 |
Construction of Concrete road With Dust filling from Manjarul house to Main Road at Natun Momrejpur 1 |
Completion of work |
-
latitude : 24.695985079742968,24.696081345900893
Longitude : 87.9249984305352,87.9250050522387
file name : Image_18042023122355655.png
|
2023-04-18 12:23:55.786749 |
281 |
59454545 |
Construction of Concrete road With Dust filling from Abdus Salam to Main Road at Natun Momrejpur vil |
120000 |
Construction of Concrete road With Dust filling from Abdus Salam to Main Road at Natun Momrejpur vil1 |
Completion of work |
-
latitude : 24.696560078300536,24.6963033
Longitude : 87.92572933249176,87.9257141
file name : Image_18042023113953888.png
|
2023-04-18 11:39:54.037919 |
282 |
59454545 |
Construction of Concrete road With Dust filling from Abdus Salam to Main Road at Natun Momrejpur vil |
120000 |
Construction of Concrete road With Dust filling from Abdus Salam to Main Road at Natun Momrejpur vil1 |
Completion of work |
-
latitude : 24.696560078300536,24.6963033
Longitude : 87.92572933249176,87.9257141
file name : Image_18042023114008186.png
|
2023-04-18 11:40:08.304186 |
283 |
59391143 |
Construction of Concrete road With Dust filling from Nojrul Sk to Sofik Sk house at Uttar Mahadebna |
160000 |
Construction of Concrete road With Dust filling from Nojrul Sk to Sofik Sk house at Uttar Mahadebna1 |
Plinth level |
-
latitude : 24.6959298,24.6959314
Longitude : 87.9425903,87.9425891
file name : Image_30052023113330945.png
|
2023-05-30 11:33:31.030662 |
284 |
59391143 |
Construction of Concrete road With Dust filling from Nojrul Sk to Sofik Sk house at Uttar Mahadebna |
160000 |
Construction of Concrete road With Dust filling from Nojrul Sk to Sofik Sk house at Uttar Mahadebna1 |
Roof laid |
-
latitude : 24.6959306,24.6959308
Longitude : 87.9425951,87.9425914
file name : Image_30052023113605333.png
|
2023-05-30 11:36:05.418082 |
285 |
59391143 |
Construction of Concrete road With Dust filling from Nojrul Sk to Sofik Sk house at Uttar Mahadebna |
160000 |
Construction of Concrete road With Dust filling from Nojrul Sk to Sofik Sk house at Uttar Mahadebna1 |
Completion of work |
-
latitude : 24.6959297,24.694705079309642
Longitude : 87.9425618,87.94453840702772
file name : Image_15052023142049624.png
|
2023-05-15 14:20:49.723562 |
286 |
59460771 |
Construction of Concrete road With Dust filling from the house of Khairul to Moti Sk at Tarapur vil |
200000 |
Construction of Concrete road With Dust filling from the house of Khairul to Moti Sk at Tarapur vil1 |
Completion of work |
-
latitude : 24.7091634,24.7091634
Longitude : 87.9177847,87.9177847
file name : Image_29052023160832766.png
|
2023-05-29 16:08:32.859638 |
287 |
59460771 |
Construction of Concrete road With Dust filling from the house of Khairul to Moti Sk at Tarapur vil |
200000 |
Construction of Concrete road With Dust filling from the house of Khairul to Moti Sk at Tarapur vil1 |
Plinth level |
-
latitude : 24.7089722,24.7089719
Longitude : 87.9180196,87.9180197
file name : Image_01062023110614296.png
|
2023-06-01 11:06:14.390317 |
288 |
59460771 |
Construction of Concrete road With Dust filling from the house of Khairul to Moti Sk at Tarapur vil |
200000 |
Construction of Concrete road With Dust filling from the house of Khairul to Moti Sk at Tarapur vil1 |
Roof laid |
-
latitude : 24.7089719,24.7089722
Longitude : 87.9180197,87.9180197
file name : Image_01062023110902431.png
|
2023-06-01 11:09:02.544221 |
289 |
59474338 |
Construction of Concrete drain With Cover from the house of Manarul Sk to Kajem Momin house at Momr |
180000 |
Construction of Concrete drain With Cover from the house of Manarul Sk to Kajem Momin house at Momr1 |
Completion of work |
-
latitude : 24.6930175,24.6930214
Longitude : 87.9388822,87.9389226
file name : Image_02052023104014583.png
|
2023-05-02 10:40:14.678462 |
290 |
59473943 |
Construction of Concrete drain With CC Road from the house of Behetar to Nasir house at Dakshin Mah |
180000 |
Construction of Concrete drain With CC Road from the house of Behetar to Nasir house at Dakshin Mah1 |
Plinth level |
-
latitude : 24.6852103,24.6852103
Longitude : 87.9403735,87.9403735
file name : Image_24042023141404802.png
|
2023-04-24 14:14:04.892191 |
291 |
59473943 |
Construction of Concrete drain With CC Road from the house of Behetar to Nasir house at Dakshin Mah |
180000 |
Construction of Concrete drain With CC Road from the house of Behetar to Nasir house at Dakshin Mah1 |
Completion of work |
-
latitude : 24.68491262756288,24.684861288405955,24.684883877635002,24.684789581224322
Longitude : 87.93932729400694,87.93976063840091,87.93983230367303,87.94040981680155
file name : Image_18042023113940919.png
|
2023-04-18 11:39:41.048269 |
292 |
59469062 |
Construction of Concrete road With Dust filling from Nojrul house to Main Road at Dakhin Mahadebnaga |
160000 |
Construction of Concrete road With Dust filling from Nojrul house to Main Road at Dakhin Mahadebnaga1 |
Plinth level |
-
latitude : 24.6833307,24.6833307
Longitude : 87.9385354,87.9385354
file name : Image_10052023105335155.png
|
2023-05-10 10:53:35.251627 |
293 |
59469062 |
Construction of Concrete road With Dust filling from Nojrul house to Main Road at Dakhin Mahadebnaga |
160000 |
Construction of Concrete road With Dust filling from Nojrul house to Main Road at Dakhin Mahadebnaga1 |
Completion of work |
-
latitude : 24.6837435,24.68342224135995
Longitude : 87.9389544,87.93892404064536
file name : Image_24042023104048365.png
|
2023-04-24 10:40:48.457956 |
294 |
59496031 |
Construction of New Tubwell with platform in front of Ajfaru Sk at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Ajfaru Sk at Natun Momrejpur village1 |
Roof laid |
-
latitude : 24.699356365017593
Longitude : 87.92712181806564
file name : Image_29052023160855749.png
|
2023-05-29 16:08:55.849145 |
295 |
59496031 |
Construction of New Tubwell with platform in front of Ajfaru Sk at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Ajfaru Sk at Natun Momrejpur village1 |
Plinth level |
-
latitude : 24.699426773004234
Longitude : 87.92716062627733
file name : Image_15052023115649187.png
|
2023-05-15 11:56:49.277413 |
296 |
59496031 |
Construction of New Tubwell with platform in front of Ajfaru Sk at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Ajfaru Sk at Natun Momrejpur village1 |
Completion of work |
-
latitude : 24.69937115907669
Longitude : 87.92714805342257
file name : Image_15052023115321879.png
|
2023-05-15 11:53:21.982971 |
297 |
59496275 |
Construction of New Tubwell with platform in front of Ayen Sk at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Ayen Sk at Natun Momrejpur village1 |
Roof laid |
-
latitude : 24.697657311335206
Longitude : 87.92607366107404
file name : Image_29052023160912208.png
|
2023-05-29 16:09:12.307453 |
298 |
59496275 |
Construction of New Tubwell with platform in front of Ayen Sk at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Ayen Sk at Natun Momrejpur village1 |
Plinth level |
-
latitude : 24.69760546926409
Longitude : 87.92604457587004
file name : Image_15052023110511982.png
|
2023-05-15 11:05:12.144181 |
299 |
59496275 |
Construction of New Tubwell with platform in front of Ayen Sk at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Ayen Sk at Natun Momrejpur village1 |
Completion of work |
-
latitude : 24.698600778356194
Longitude : 87.92712676338851
file name : Image_18042023115646473.png
|
2023-04-18 11:56:46.582147 |
300 |
59496275 |
Construction of New Tubwell with platform in front of Ayen Sk at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Ayen Sk at Natun Momrejpur village1 |
Completion of work |
-
latitude : 24.698600778356194
Longitude : 87.92712676338851
file name : Image_18042023115703178.png
|
2023-04-18 11:57:03.299122 |
301 |
59496508 |
Construction of New Tubwell with platform in front of Joidur Sk at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Joidur Sk at Natun Momrejpur village1 |
Roof laid |
-
latitude : 24.697131807915866
Longitude : 87.92922031134367
file name : Image_29052023160839956.png
|
2023-05-29 16:08:40.046085 |
302 |
59496508 |
Construction of New Tubwell with platform in front of Joidur Sk at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Joidur Sk at Natun Momrejpur village1 |
Plinth level |
-
latitude : 24.69716395251453
Longitude : 87.92925626970828
file name : Image_15052023113035581.png
|
2023-05-15 11:30:35.690182 |
303 |
59496508 |
Construction of New Tubwell with platform in front of Joidur Sk at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Joidur Sk at Natun Momrejpur village1 |
Completion of work |
-
latitude : 24.6971007110551
Longitude : 87.92924780398607
file name : Image_15052023112411301.png
|
2023-05-15 11:24:11.417923 |
304 |
59496761 |
Construction of New Tubwell with platform in front of Hasen Sk at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Hasen Sk at Natun Momrejpur village1 |
Roof laid |
-
latitude : 24.699249328114092
Longitude : 87.92580426670611
file name : Image_29052023160906355.png
|
2023-05-29 16:09:06.447506 |
305 |
59496761 |
Construction of New Tubwell with platform in front of Hasen Sk at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Hasen Sk at Natun Momrejpur village1 |
Plinth level |
-
latitude : 24.699220075272024
Longitude : 87.92583050206304
file name : Image_15052023111728588.png
|
2023-05-15 11:17:28.690595 |
306 |
59496761 |
Construction of New Tubwell with platform in front of Hasen Sk at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Hasen Sk at Natun Momrejpur village1 |
Completion of work |
-
latitude : 24.699260643683374
Longitude : 87.92586302384734
file name : Image_15052023111522751.png
|
2023-05-15 11:15:22.838268 |
307 |
59499212 |
Construction of New Tubwell with platform in front of Lutfal Hoque at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Lutfal Hoque at Natun Momrejpur village1 |
Roof laid |
-
latitude : 24.698700523003936
Longitude : 87.92673423886299
file name : Image_29052023160850353.png
|
2023-05-29 16:08:50.451074 |
308 |
59499212 |
Construction of New Tubwell with platform in front of Lutfal Hoque at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Lutfal Hoque at Natun Momrejpur village1 |
Plinth level |
-
latitude : 24.699109895154834
Longitude : 87.9268428683281
file name : Image_15052023115046187.png
|
2023-05-15 11:50:46.288699 |
309 |
59499212 |
Construction of New Tubwell with platform in front of Lutfal Hoque at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Lutfal Hoque at Natun Momrejpur village1 |
Completion of work |
-
latitude : 24.697624454274774
Longitude : 87.9259289894253
file name : Image_18042023115641963.png
|
2023-04-18 11:56:42.075586 |
310 |
59499427 |
Construction of New Tubwell with platform in front of Mohobul at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Mohobul at Natun Momrejpur village1 |
Roof laid |
-
latitude : 24.696922218427062
Longitude : 87.92566445656121
file name : Image_29052023160916821.png
|
2023-05-29 16:09:16.915707 |
311 |
59499427 |
Construction of New Tubwell with platform in front of Mohobul at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Mohobul at Natun Momrejpur village1 |
Plinth level |
-
latitude : 24.696962870657444
Longitude : 87.92563796974719
file name : Image_15052023115945069.png
|
2023-05-15 11:59:45.184156 |
312 |
59499427 |
Construction of New Tubwell with platform in front of Mohobul at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Mohobul at Natun Momrejpur village1 |
Completion of work |
-
latitude : 24.696971336379647
Longitude : 87.92561944574118
file name : Image_18042023123147676.png
|
2023-04-18 12:31:47.809093 |
313 |
59499643 |
Construction of New Tubwell with platform in front of Kalu at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Kalu at Natun Momrejpur village1 |
Roof laid |
-
latitude : 24.6997488
Longitude : 87.9266682
file name : Image_29052023160901614.png
|
2023-05-29 16:09:01.706053 |
314 |
59499643 |
Construction of New Tubwell with platform in front of Kalu at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Kalu at Natun Momrejpur village1 |
Plinth level |
-
latitude : 24.699749
Longitude : 87.9266678
file name : Image_15052023111539890.png
|
2023-05-15 11:15:39.993119 |
315 |
59499643 |
Construction of New Tubwell with platform in front of Kalu at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Kalu at Natun Momrejpur village1 |
Completion of work |
-
latitude : 24.699714523740113
Longitude : 87.9270633123815
file name : Image_18042023115655564.png
|
2023-04-18 11:56:55.674414 |
316 |
59499643 |
Construction of New Tubwell with platform in front of Kalu at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Kalu at Natun Momrejpur village1 |
Completion of work |
-
latitude : 24.699714523740113
Longitude : 87.9270633123815
file name : Image_18042023115712037.png
|
2023-04-18 11:57:12.151641 |
317 |
59499877 |
Construction of New Tubwell with platform in front of Jullur Rahaman at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Jullur Rahaman at Natun Momrejpur village1 |
Roof laid |
-
latitude : 24.6984078
Longitude : 87.9290373
file name : Image_29052023160845583.png
|
2023-05-29 16:08:45.675599 |
318 |
59499877 |
Construction of New Tubwell with platform in front of Jullur Rahaman at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Jullur Rahaman at Natun Momrejpur village1 |
Plinth level |
-
latitude : 24.697756385430694
Longitude : 87.9283900000155
file name : Image_15052023113753431.png
|
2023-05-15 11:37:53.541346 |
319 |
59499877 |
Construction of New Tubwell with platform in front of Jullur Rahaman at Natun Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Jullur Rahaman at Natun Momrejpur village1 |
Completion of work |
-
latitude : 24.69791224692017
Longitude : 87.92887832969427
file name : Image_18042023121643639.png
|
2023-04-18 12:16:43.743389 |
320 |
70876018 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.694025558419526
Longitude : 87.94374514371157
file name : Image_05022024124513479.png
|
2024-02-05 12:45:13.557924 |
321 |
70876018 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.69401943963021
Longitude : 87.94379719533026
file name : Image_05022024124128601.png
|
2024-02-05 12:41:28.691766 |
322 |
70876018 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.6945169
Longitude : 87.9427505
file name : Image_11012024114403275.png
|
2024-01-11 11:44:03.364991 |
323 |
59459371 |
Construction of Concrete road With Dust filling from the house of Manik Ghosh to Uttam Das at Madhya |
160000 |
Construction of Concrete road With Dust filling from the house of Manik Ghosh to Uttam Das at Madhya1 |
Plinth level |
-
latitude : 24.70795925706625,24.690040801651776
Longitude : 87.91922371834517,87.93851324357092
file name : Image_01062023112932752.png
|
2023-06-01 11:29:32.875923 |
324 |
59459371 |
Construction of Concrete road With Dust filling from the house of Manik Ghosh to Uttam Das at Madhya |
160000 |
Construction of Concrete road With Dust filling from the house of Manik Ghosh to Uttam Das at Madhya1 |
Roof laid |
-
latitude : 24.690110748633742,24.689632
Longitude : 87.9384746029973,87.938229
file name : Image_01062023113326790.png
|
2023-06-01 11:33:26.881519 |
325 |
59459371 |
Construction of Concrete road With Dust filling from the house of Manik Ghosh to Uttam Das at Madhya |
160000 |
Construction of Concrete road With Dust filling from the house of Manik Ghosh to Uttam Das at Madhya1 |
Completion of work |
-
latitude : 24.690080448053777,24.69008174724877
Longitude : 87.93832456693053,87.93831023387611
file name : Image_18042023113947389.png
|
2023-04-18 11:39:47.504126 |
326 |
59459371 |
Construction of Concrete road With Dust filling from the house of Manik Ghosh to Uttam Das at Madhya |
160000 |
Construction of Concrete road With Dust filling from the house of Manik Ghosh to Uttam Das at Madhya1 |
Completion of work |
-
latitude : 24.690080448053777,24.69008174724877
Longitude : 87.93832456693053,87.93831023387611
file name : Image_18042023114000614.png
|
2023-04-18 11:40:00.738676 |
327 |
59475482 |
Construction of Concrete drain With CC Road from the house of Samor Ghosh house to Rajen Ghosh at M |
180000 |
Construction of Concrete drain With CC Road from the house of Samor Ghosh house to Rajen Ghosh at M1 |
Plinth level |
-
latitude : 24.6885175,24.6885175
Longitude : 87.9364785,87.9364785
file name : Image_29052023160922207.png
|
2023-05-29 16:09:22.302267 |
328 |
59475482 |
Construction of Concrete drain With CC Road from the house of Samor Ghosh house to Rajen Ghosh at M |
180000 |
Construction of Concrete drain With CC Road from the house of Samor Ghosh house to Rajen Ghosh at M1 |
Roof laid |
-
latitude : 24.6885036,24.688514
Longitude : 87.9364783,87.9364853
file name : Image_29052023161248640.png
|
2023-05-29 16:12:48.726467 |
329 |
59475482 |
Construction of Concrete drain With CC Road from the house of Samor Ghosh house to Rajen Ghosh at M |
180000 |
Construction of Concrete drain With CC Road from the house of Samor Ghosh house to Rajen Ghosh at M1 |
Completion of work |
-
latitude : 24.689129018224776,24.6880434
Longitude : 87.93671172112226,87.937291
file name : Image_17052023130930267.png
|
2023-05-17 13:09:30.391532 |
330 |
59457297 |
Construction of Concrete road With Dust filling from Maha Gini house to Iliyas house at Gopal Nagar |
160000 |
Construction of Concrete road With Dust filling from Maha Gini house to Iliyas house at Gopal Nagar 1 |
Plinth level |
-
latitude : 24.69092915765941,24.690929199568927
Longitude : 87.92831867001951,87.92831816710532
file name : Image_30052023155113440.png
|
2023-05-30 15:51:13.524306 |
331 |
59457297 |
Construction of Concrete road With Dust filling from Maha Gini house to Iliyas house at Gopal Nagar |
160000 |
Construction of Concrete road With Dust filling from Maha Gini house to Iliyas house at Gopal Nagar 1 |
Roof laid |
-
latitude : 24.6909098373726,24.69090954400599
Longitude : 87.92830576188862,87.92830710299313
file name : Image_30052023155909813.png
|
2023-05-30 15:59:09.906707 |
332 |
59457297 |
Construction of Concrete road With Dust filling from Maha Gini house to Iliyas house at Gopal Nagar |
160000 |
Construction of Concrete road With Dust filling from Maha Gini house to Iliyas house at Gopal Nagar 1 |
Completion of work |
-
latitude : 24.69079471193254,24.690879746340215
Longitude : 87.92839561589062,87.92840885929763
file name : Image_02052023115736235.png
|
2023-05-02 11:57:36.917542 |
333 |
59393610 |
Construction of Concrete road With Dust filling from Main Road to Kali pal house at Per Momrejpur v |
160000 |
Construction of Concrete road With Dust filling from Main Road to Kali pal house at Per Momrejpur v1 |
Plinth level |
-
latitude : 24.6903822,24.6903822
Longitude : 87.9388417,87.9388417
file name : Image_12062023091443650.png
|
2023-06-12 09:14:43.737551 |
334 |
59393610 |
Construction of Concrete road With Dust filling from Main Road to Kali pal house at Per Momrejpur v |
160000 |
Construction of Concrete road With Dust filling from Main Road to Kali pal house at Per Momrejpur v1 |
Completion of work |
-
latitude : 24.69078863505274,24.6914823
Longitude : 87.93877651914954,87.9379226
file name : Image_24052023113846038.png
|
2023-05-24 11:38:46.136785 |
335 |
59475122 |
Construction of Concrete drain With CC Road from the house of Johorul to Kalam Nadap at Uttar Mahad |
180000 |
Construction of Concrete drain With CC Road from the house of Johorul to Kalam Nadap at Uttar Mahad1 |
Plinth level |
-
latitude : 24.692323822528124,24.692323822528124
Longitude : 87.9421529173851,87.9421529173851
file name : Image_08062023110507345.png
|
2023-06-08 11:05:07.432737 |
336 |
59475122 |
Construction of Concrete drain With CC Road from the house of Johorul to Kalam Nadap at Uttar Mahad |
180000 |
Construction of Concrete drain With CC Road from the house of Johorul to Kalam Nadap at Uttar Mahad1 |
Roof laid |
-
latitude : 24.6922827,24.6922827
Longitude : 87.9422115,87.9422115
file name : Image_08062023111559589.png
|
2023-06-08 11:15:59.686185 |
337 |
59475122 |
Construction of Concrete drain With CC Road from the house of Johorul to Kalam Nadap at Uttar Mahad |
180000 |
Construction of Concrete drain With CC Road from the house of Johorul to Kalam Nadap at Uttar Mahad1 |
Completion of work |
-
latitude : 24.692468913272023,24.692465770058334
Longitude : 87.94217772781849,87.94214495457709
file name : Image_27042023115927971.png
|
2023-04-27 11:59:28.341482 |
338 |
59475122 |
Construction of Concrete drain With CC Road from the house of Johorul to Kalam Nadap at Uttar Mahad |
180000 |
Construction of Concrete drain With CC Road from the house of Johorul to Kalam Nadap at Uttar Mahad1 |
Completion of work |
-
latitude : 24.692468913272023,24.692465770058334
Longitude : 87.94217772781849,87.94214495457709
file name : Image_27042023115932139.png
|
2023-04-27 11:59:32.270622 |
339 |
74445013 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.69187
Longitude : 87.9391481
file name : Image_13062023101840951.png
|
2023-06-13 10:18:41.043857 |
340 |
74443899 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.693278
Longitude : 87.9387756
file name : Image_13062023100700454.png
|
2023-06-13 10:07:00.546905 |
341 |
59500550 |
Construction of New Tubwell with platform in front of Sayed at Gopalnagar village |
25000 |
Construction of New Tubwell with platform in front of Sayed at Gopalnagar village1 |
Completion of work |
-
latitude : 24.681432209908962
Longitude : 87.92573628947139
file name : Image_21082023114312950.png
|
2023-08-21 11:43:13.07437 |
342 |
75678968 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.6876859
Longitude : 87.9366937
file name : Image_13062023084434783.png
|
2023-06-13 08:44:34.942204 |
343 |
75679158 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.6851282
Longitude : 87.9427002
file name : Image_13062023085029460.png
|
2023-06-13 08:50:29.554764 |
344 |
59486081 |
Construction of New Tubwell with platform in front of Amar Ghosh at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Amar Ghosh at Madhya Mahadebnagar village1 |
Plinth level |
-
latitude : 24.6888502
Longitude : 87.9376442
file name : Image_20092023141634649.png
|
2023-09-20 14:16:34.740011 |
345 |
59486081 |
Construction of New Tubwell with platform in front of Amar Ghosh at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Amar Ghosh at Madhya Mahadebnagar village1 |
Completion of work |
-
latitude : 24.6903152
Longitude : 87.9375634
file name : Image_16062023080842900.png
|
2023-06-16 08:08:42.985478 |
346 |
59487494 |
Construction of New Tubwell with platform in front of Mohobul Sk at Nishindrapara village |
25000 |
Construction of New Tubwell with platform in front of Mohobul Sk at Nishindrapara village1 |
Completion of work |
-
latitude : 24.686511768959463
Longitude : 87.9333199840039
file name : Image_16062023074332418.png
|
2023-06-16 07:43:32.582778 |
347 |
59489476 |
Construction of New Tubwell with platform in front of Jakir Hossain at Dakhin Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Jakir Hossain at Dakhin Mahadebnagar village1 |
Completion of work |
-
latitude : 24.6836251
Longitude : 87.9373496
file name : Image_26062023095308627.png
|
2023-06-26 09:53:08.728973 |
348 |
75677808 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.6848436
Longitude : 87.9406798
file name : Image_15062023075753902.png
|
2023-06-15 07:57:53.999834 |
349 |
59491896 |
Construction of New Tubwell with platform in front of Aliul Momin at Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Aliul Momin at Momrejpur village1 |
Completion of work |
-
latitude : 24.6934925
Longitude : 87.9388377
file name : Image_13062023102149295.png
|
2023-06-13 10:21:49.381353 |
350 |
59486652 |
Construction of New Tubwell with platform in front of Habibur Sk at Nishindrapara village |
25000 |
Construction of New Tubwell with platform in front of Habibur Sk at Nishindrapara village1 |
Completion of work |
-
latitude : 24.687691
Longitude : 87.9365846
file name : Image_16062023073100727.png
|
2023-06-16 07:31:00.869393 |
351 |
59492418 |
Construction of New Tubwell with platform in front of Ajmaul Hoque at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Ajmaul Hoque at Madhya Mahadebnagar village1 |
Completion of work |
-
latitude : 24.687897
Longitude : 87.9375377
file name : Image_13062023093333102.png
|
2023-06-13 09:33:33.22814 |
352 |
75678898 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.686510511673987
Longitude : 87.93832934461534
file name : Image_13062023090715965.png
|
2023-06-13 09:07:16.056889 |
353 |
59492788 |
Construction of New Tubwell with platform in front of Besarat Sk at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Besarat Sk at Madhya Mahadebnagar village1 |
Completion of work |
-
latitude : 24.686372629366815
Longitude : 87.93741814792156
file name : Image_13062023085523059.png
|
2023-06-13 08:55:23.163643 |
354 |
59486903 |
Construction of New Tubwell with platform in front of Mintu Sk at Nishindrapara village |
25000 |
Construction of New Tubwell with platform in front of Mintu Sk at Nishindrapara village1 |
Completion of work |
-
latitude : 24.6876834
Longitude : 87.9364197
file name : Image_16062023073513098.png
|
2023-06-16 07:35:13.225837 |
355 |
59487215 |
Construction of New Tubwell with platform in front of Ketabuddin Sk at Nishindrapara village |
25000 |
Construction of New Tubwell with platform in front of Ketabuddin Sk at Nishindrapara village1 |
Completion of work |
-
latitude : 24.68664583750069
Longitude : 87.93458179570735
file name : Image_16062023073825220.png
|
2023-06-16 07:38:25.432121 |
356 |
59494246 |
Construction of New Tubwell with platform in front of Rehena at Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Rehena at Mahadebnagar village1 |
Completion of work |
-
latitude : 24.690230903215706
Longitude : 87.9418246820569
file name : Image_23072023130353928.png
|
2023-07-23 13:03:54.005114 |
357 |
59480794 |
Construction of New Tubwell with platform in front of Nimtala Mandir at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Nimtala Mandir at Madhya Mahadebnagar village1 |
Completion of work |
-
latitude : 24.6896513
Longitude : 87.9390045
file name : Image_19072023114408203.png
|
2023-07-19 11:44:08.326445 |
358 |
59481055 |
Construction of New Tubwell with platform in front of Kaji Nojrul Islam at Madhya Mahadebnagar vill |
25000 |
Construction of New Tubwell with platform in front of Kaji Nojrul Islam at Madhya Mahadebnagar vill1 |
Completion of work |
-
latitude : 24.6887099
Longitude : 87.9375353
file name : Image_19072023115056484.png
|
2023-07-19 11:50:56.584706 |
359 |
75677721 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.6851282
Longitude : 87.9427002
file name : Image_15062023075002745.png
|
2023-06-15 07:50:02.833806 |
360 |
59481395 |
Construction of New Tubwell with platform in front of ICDS Centre Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of ICDS Centre Momrejpur village1 |
Completion of work |
-
latitude : 24.692022828385234
Longitude : 87.93524597771466
file name : Image_19072023122716845.png
|
2023-07-19 12:27:16.971014 |
361 |
59481672 |
Construction of New Tubwell with platform in front of Akbor Nadap Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Akbor Nadap Momrejpur village1 |
Completion of work |
-
latitude : 24.692891277372837
Longitude : 87.93989139609039
file name : Image_19072023122154273.png
|
2023-07-19 12:21:54.35354 |
362 |
59481965 |
Construction of New Tubwell with platform in front of Nasiruddin Sk Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Nasiruddin Sk Momrejpur village1 |
Completion of work |
-
latitude : 24.6942198
Longitude : 87.9385507
file name : Image_19072023121224999.png
|
2023-07-19 12:12:25.094141 |
363 |
59482276 |
Construction of New Tubwell with platform in front of Nasir Sk Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Nasir Sk Momrejpur village1 |
Completion of work |
-
latitude : 24.6937272
Longitude : 87.9389314
file name : Image_19072023121726736.png
|
2023-07-19 12:17:26.83116 |
364 |
59490839 |
Construction of New Tubwell with platform in front of Sainara at Dakhin Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Sainara at Dakhin Mahadebnagar village1 |
Plinth level |
-
latitude : 24.6851258
Longitude : 87.9426753
file name : Image_19072023113155228.png
|
2023-07-19 11:31:55.332362 |
365 |
59490839 |
Construction of New Tubwell with platform in front of Sainara at Dakhin Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Sainara at Dakhin Mahadebnagar village1 |
Plinth level |
-
latitude : 24.6851258
Longitude : 87.9426753
file name : Image_19072023113206022.png
|
2023-07-19 11:32:06.115286 |
366 |
59490839 |
Construction of New Tubwell with platform in front of Sainara at Dakhin Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Sainara at Dakhin Mahadebnagar village1 |
Completion of work |
-
latitude : 24.6851792
Longitude : 87.9427031
file name : Image_15062023081333280.png
|
2023-06-15 08:13:33.374992 |
367 |
59491383 |
Construction of New Tubwell with platform in front of Hori Jiban Ghosh at Per Ankura village |
25000 |
Construction of New Tubwell with platform in front of Hori Jiban Ghosh at Per Ankura village1 |
Completion of work |
-
latitude : 24.68906422611326
Longitude : 87.92901252396405
file name : Image_19072023125521963.png
|
2023-07-19 12:55:22.071718 |
368 |
47641491 |
CONSTRUCTION OF CONCRETE DRAIN MONIB TO NURUL |
350000 |
CONSTRUCTION OF CONCRETE DRAIN MONIB TO NURUL1 |
Roof laid |
-
latitude : 24.709463682956994,24.710078914649785
Longitude : 87.9190321918577,87.91955740191042
file name : Image_06042023123934907.png
|
2023-04-06 12:39:34.972864 |
369 |
47641491 |
CONSTRUCTION OF CONCRETE DRAIN MONIB TO NURUL |
350000 |
CONSTRUCTION OF CONCRETE DRAIN MONIB TO NURUL1 |
Plinth level |
-
latitude : 24.710008925758302,24.709900212474167
Longitude : 87.91958346962929,87.91948573663831
file name : Image_13032023105145683.png
|
2023-03-13 10:51:45.774874 |
370 |
47641491 |
CONSTRUCTION OF CONCRETE DRAIN MONIB TO NURUL |
350000 |
CONSTRUCTION OF CONCRETE DRAIN MONIB TO NURUL1 |
Completion of work |
-
latitude : 24.7081607,24.7081607
Longitude : 87.9189486,87.9189487
file name : Image_29112022164639186.png
|
2022-11-29 16:46:39.288714 |
371 |
47642133 |
Construction of Concrete drain with cover from the house of Abdul house to Main Road at Natun Momre |
340000 |
Construction of Concrete drain with cover from the house of Abdul house to Main Road at Natun Momre1 |
Plinth level |
-
latitude : 24.698691554367542,24.698680574074388
Longitude : 87.92691067792475,87.92692341841757
file name : Image_25062022102355404.png
|
2022-06-25 10:23:55.476109 |
372 |
47642133 |
Construction of Concrete drain with cover from the house of Abdul house to Main Road at Natun Momre |
340000 |
Construction of Concrete drain with cover from the house of Abdul house to Main Road at Natun Momre1 |
Completion of work |
-
latitude : 24.698698301799595,24.698567879386246
Longitude : 87.92692232877016,87.92692551389337
file name : Image_15062022111832749.png
|
2022-06-15 11:18:32.836194 |
373 |
47644202 |
Construction of Concrete drain with cover from the house of Hefaj Khalifa house to Abdus Salam houe |
300000 |
Construction of Concrete drain with cover from the house of Hefaj Khalifa house to Abdus Salam houe1 |
Plinth level |
-
latitude : 24.6937162,24.6937507
Longitude : 87.9390025,87.9390369
file name : Image_20072022122706791.png
|
2022-07-20 12:27:06.864983 |
374 |
47644202 |
Construction of Concrete drain with cover from the house of Hefaj Khalifa house to Abdus Salam houe |
300000 |
Construction of Concrete drain with cover from the house of Hefaj Khalifa house to Abdus Salam houe1 |
Completion of work |
-
latitude : 24.6934312,24.6937549
Longitude : 87.9387238,87.9389865
file name : Image_15062022131825775.png
|
2022-06-15 13:18:25.846267 |
375 |
59480212 |
Construction of New Tubwell with platform in front of Dipak Das at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Dipak Das at Madhya Mahadebnagar village1 |
Completion of work |
-
latitude : 24.690581057220697
Longitude : 87.93877844698727
file name : Image_19072023113158851.png
|
2023-07-19 11:31:58.963339 |
376 |
59480212 |
Construction of New Tubwell with platform in front of Dipak Das at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Dipak Das at Madhya Mahadebnagar village1 |
Completion of work |
-
latitude : 24.690581057220697
Longitude : 87.93877844698727
file name : Image_19072023113209588.png
|
2023-07-19 11:32:09.687673 |
377 |
59480491 |
Construction of New Tubwell with platform in front of Simanta Das at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Simanta Das at Madhya Mahadebnagar village1 |
Completion of work |
-
latitude : 24.68996226321906
Longitude : 87.93839514255524
file name : Image_19072023113642831.png
|
2023-07-19 11:36:42.942815 |
378 |
59488888 |
Construction of New Tubwell with platform in front of Tarik Aziz at Uttar Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Tarik Aziz at Uttar Mahadebnagar village1 |
Completion of work |
-
latitude : 24.694284391589463
Longitude : 87.94426775537431
file name : Image_23072023123550167.png
|
2023-07-23 12:35:50.263835 |
379 |
59493019 |
Construction of New Tubwell with platform in front of Kalu at Uttar Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Kalu at Uttar Mahadebnagar village1 |
Completion of work |
-
latitude : 24.6933496
Longitude : 87.943777
file name : Image_23072023122319597.png
|
2023-07-23 12:23:19.705962 |
380 |
59493286 |
Construction of New Tubwell with platform in front of Pintu at Uttar Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Pintu at Uttar Mahadebnagar village1 |
Completion of work |
-
latitude : 24.693865841254592
Longitude : 87.94368864968419
file name : Image_23072023122717200.png
|
2023-07-23 12:27:17.298454 |
381 |
59493547 |
Construction of New Tubwell with platform in front of Harun Al Rashid at Uttar Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Harun Al Rashid at Uttar Mahadebnagar village1 |
Completion of work |
-
latitude : 24.6933181
Longitude : 87.9435513
file name : Image_23072023121821592.png
|
2023-07-23 12:18:21.699018 |
382 |
59493791 |
Construction of New Tubwell with platform in front of Jahangir at Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Jahangir at Mahadebnagar village1 |
Completion of work |
-
latitude : 24.691110625863075
Longitude : 87.94244184158742
file name : Image_23072023125449702.png
|
2023-07-23 12:54:54.414636 |
383 |
59494013 |
Construction of New Tubwell with platform in front of Mojahar at Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Mojahar at Mahadebnagar village1 |
Completion of work |
-
latitude : 24.691329896450043
Longitude : 87.94267586432397
file name : Image_23072023125848003.png
|
2023-07-23 12:58:48.125768 |
384 |
75680601 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.6960551
Longitude : 87.9424598
file name : Image_08082023144003734.png
|
2023-08-08 14:40:03.846729 |
385 |
75680601 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.6958194
Longitude : 87.9425848
file name : Image_23072023083201745.png
|
2023-07-23 08:32:01.83534 |
386 |
75680601 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.6958194
Longitude : 87.9425848
file name : Image_23072023083253105.png
|
2023-07-23 08:32:53.230986 |
387 |
75680437 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.6945672
Longitude : 87.9422664
file name : Image_08082023144547307.png
|
2023-08-08 14:45:47.444149 |
388 |
75680437 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.6957581
Longitude : 87.9424614
file name : Image_23072023083858124.png
|
2023-07-23 08:38:58.211447 |
389 |
75680142 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.693362591788173
Longitude : 87.94206985272467
file name : Image_08082023143527096.png
|
2023-08-08 14:35:27.20048 |
390 |
75680142 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.693774771876633
Longitude : 87.9424187913537
file name : Image_23072023090027297.png
|
2023-07-23 09:00:27.398944 |
391 |
75682005 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.694099193438888
Longitude : 87.94166936539114
file name : Image_08082023145252632.png
|
2023-08-08 14:52:52.732579 |
392 |
75682005 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.693998862057924
Longitude : 87.94149845838547
file name : Image_23072023084203042.png
|
2023-07-23 08:42:03.140737 |
393 |
75679912 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.693434215150774
Longitude : 87.94129863381386
file name : Image_08082023145655247.png
|
2023-08-08 14:56:55.344166 |
394 |
75679912 |
Water Supply to villages |
22000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.69351631589234
Longitude : 87.94124842621386
file name : Image_30072023111301223.png
|
2023-07-30 11:13:01.316946 |
395 |
59495470 |
Construction of New Tubwell with platform in front of Majarul Sk at Per Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Majarul Sk at Per Momrejpur village1 |
Plinth level |
-
latitude : 24.6912048
Longitude : 87.9410787
file name : Image_08082023113819742.png
|
2023-08-08 11:38:19.876437 |
396 |
59495470 |
Construction of New Tubwell with platform in front of Majarul Sk at Per Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Majarul Sk at Per Momrejpur village1 |
Completion of work |
-
latitude : 24.69103732611984
Longitude : 87.94113485142589
file name : Image_23072023114120026.png
|
2023-07-23 11:41:20.131038 |
397 |
59495258 |
Construction of New Tubwell with platform in front of Durga Mondir at Per Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Durga Mondir at Per Momrejpur village1 |
Plinth level |
-
latitude : 24.691132167354226
Longitude : 87.94086235575378
file name : Image_08082023112955052.png
|
2023-08-08 11:29:55.142462 |
398 |
59495258 |
Construction of New Tubwell with platform in front of Durga Mondir at Per Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Durga Mondir at Per Momrejpur village1 |
Plinth level |
-
latitude : 24.691132167354226
Longitude : 87.94086235575378
file name : Image_08082023113019418.png
|
2023-08-08 11:30:19.504576 |
399 |
59495258 |
Construction of New Tubwell with platform in front of Durga Mondir at Per Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Durga Mondir at Per Momrejpur village1 |
Completion of work |
-
latitude : 24.691214351914823
Longitude : 87.94089772738516
file name : Image_23072023113530126.png
|
2023-07-23 11:35:30.250876 |
400 |
59495016 |
Construction of New Tubwell with platform in front of Raisuddin Sk at Per Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Raisuddin Sk at Per Momrejpur village1 |
Plinth level |
-
latitude : 24.691265313886106
Longitude : 87.94092781841755
file name : Image_08082023113254831.png
|
2023-08-08 11:32:54.914317 |
401 |
59495016 |
Construction of New Tubwell with platform in front of Raisuddin Sk at Per Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Raisuddin Sk at Per Momrejpur village1 |
Completion of work |
-
latitude : 24.6911533
Longitude : 87.9409861
file name : Image_23072023114429715.png
|
2023-07-23 11:44:29.805956 |
402 |
59487763 |
Construction of New Tubwell with platform in front of Swadhin Sarkar at Ankura village |
25000 |
Construction of New Tubwell with platform in front of Swadhin Sarkar at Ankura village1 |
Completion of work |
-
latitude : 24.6831956
Longitude : 87.9309035
file name : Image_28072023180017678.png
|
2023-07-28 18:00:17.801796 |
403 |
59488049 |
Construction of New Tubwell with platform in front of Mahabir Mondal at Ankura village |
25000 |
Construction of New Tubwell with platform in front of Mahabir Mondal at Ankura village1 |
Completion of work |
-
latitude : 24.682871256954968
Longitude : 87.93158979155123
file name : Image_28072023180408504.png
|
2023-07-28 18:04:08.80426 |
404 |
59488352 |
Construction of New Tubwell with platform in front of Sohorab Sk at Ankura village |
25000 |
Construction of New Tubwell with platform in front of Sohorab Sk at Ankura village1 |
Completion of work |
-
latitude : 24.687553429976106
Longitude : 87.93069636449218
file name : Image_28072023181518865.png
|
2023-07-28 18:15:18.952967 |
405 |
59488612 |
Construction of New Tubwell with platform in front of Khokan Sardar at Ankura village |
25000 |
Construction of New Tubwell with platform in front of Khokan Sardar at Ankura village1 |
Completion of work |
-
latitude : 24.6840757
Longitude : 87.9307958
file name : Image_28072023180857233.png
|
2023-07-28 18:08:57.44266 |
406 |
59489197 |
Construction of New Tubwell with platform in front of Anjumanara Khatun at Dakhin Mahadebnagar vill |
25000 |
Construction of New Tubwell with platform in front of Anjumanara Khatun at Dakhin Mahadebnagar vill1 |
Completion of work |
-
latitude : 24.68307175207883
Longitude : 87.93844560161233
file name : Image_06082023165429065.png
|
2023-08-06 16:54:29.195186 |
407 |
59494511 |
Construction of New Tubwell with platform in front of Nasim Sk at Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Nasim Sk at Mahadebnagar village1 |
Completion of work |
-
latitude : 24.6916746
Longitude : 87.9419398
file name : Image_28072023172443264.png
|
2023-07-28 17:24:43.387575 |
408 |
59494764 |
Construction of New Tubwell with platform in front of Bidhan Pal at Per Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Bidhan Pal at Per Momrejpur village1 |
Plinth level |
-
latitude : 24.6912054
Longitude : 87.9410873
file name : Image_08082023113524702.png
|
2023-08-08 11:35:24.793221 |
409 |
59494764 |
Construction of New Tubwell with platform in front of Bidhan Pal at Per Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Bidhan Pal at Per Momrejpur village1 |
Completion of work |
-
latitude : 24.6911054
Longitude : 87.9409893
file name : Image_27072023175554502.png
|
2023-07-27 17:55:54.600266 |
410 |
59394305 |
Construction of Concrete road With Dust filling from Dipali Chakraborty to Dipak Bhaskar at Par Mo |
200000 |
Construction of Concrete road With Dust filling from Dipali Chakraborty to Dipak Bhaskar at Par Mo1 |
Completion of work |
-
latitude : 24.692457,24.6923557
Longitude : 87.9414332,87.9413677
file name : Image_27072023180226902.png
|
2023-07-27 18:02:26.991227 |
411 |
59471566 |
Construction of Concrete drain With CC Road from Samsul house to Mofak & Mastara to Obaidur via Yea |
180000 |
Construction of Concrete drain With CC Road from Samsul house to Mofak & Mastara to Obaidur via Yea1 |
Plinth level |
-
latitude : 24.6898019,24.6897987
Longitude : 87.9420935,87.9420962
file name : Image_30052023154034168.png
|
2023-05-30 15:40:34.25461 |
412 |
59471566 |
Construction of Concrete drain With CC Road from Samsul house to Mofak & Mastara to Obaidur via Yea |
180000 |
Construction of Concrete drain With CC Road from Samsul house to Mofak & Mastara to Obaidur via Yea1 |
Completion of work |
-
latitude : 24.6904231,24.690260784700513
Longitude : 87.9399971,87.941066455096
file name : Image_24042023142320217.png
|
2023-04-24 14:23:20.319154 |
413 |
59482568 |
Construction of New Tubwell with platform in front of Salam Sk at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Salam Sk at Madhya Mahadebnagar village1 |
Plinth level |
-
latitude : 24.6899087
Longitude : 87.9370241
file name : Image_20092023140922985.png
|
2023-09-20 14:09:23.077373 |
414 |
59482568 |
Construction of New Tubwell with platform in front of Salam Sk at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Salam Sk at Madhya Mahadebnagar village1 |
Completion of work |
-
latitude : 24.6899064
Longitude : 87.9370223
file name : Image_14082023113523793.png
|
2023-08-14 11:35:23.870718 |
415 |
59490238 |
Construction of New Tubwell with platform in front of Bari house at Uttar Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Bari house at Uttar Mahadebnagar village1 |
Plinth level |
-
latitude : 24.6914656
Longitude : 87.9424275
file name : Image_08082023142544440.png
|
2023-08-08 14:25:44.533589 |
416 |
59490238 |
Construction of New Tubwell with platform in front of Bari house at Uttar Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Bari house at Uttar Mahadebnagar village1 |
Completion of work |
-
latitude : 24.69173646066338
Longitude : 87.94239574111998
file name : Image_21072023112345737.png
|
2023-07-21 11:23:45.822347 |
417 |
59490565 |
Construction of New Tubwell with platform in front of Nojrul at Uttar Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Nojrul at Uttar Mahadebnagar village1 |
Plinth level |
-
latitude : 24.6922292
Longitude : 87.9413173
file name : Image_08082023143153689.png
|
2023-08-08 14:31:53.796646 |
418 |
59490565 |
Construction of New Tubwell with platform in front of Nojrul at Uttar Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Nojrul at Uttar Mahadebnagar village1 |
Completion of work |
-
latitude : 24.693290842697024
Longitude : 87.94206272810698
file name : Image_23072023083156776.png
|
2023-07-23 08:31:56.858477 |
419 |
59501316 |
Construction of Bathing Ghat infornt of Moin Sardar house beside of Bagmari river at Madhya Mahadebn |
250000 |
Construction of Bathing Ghat infornt of Moin Sardar house beside of Bagmari river at Madhya Mahadebn1 |
Plinth level |
-
latitude : 24.688718
Longitude : 87.9363882
file name : Image_08082023112951807.png
|
2023-08-08 11:29:51.919467 |
420 |
59501316 |
Construction of Bathing Ghat infornt of Moin Sardar house beside of Bagmari river at Madhya Mahadebn |
250000 |
Construction of Bathing Ghat infornt of Moin Sardar house beside of Bagmari river at Madhya Mahadebn1 |
Completion of work |
-
latitude : 24.6886799
Longitude : 87.9363849
file name : Image_27072023170153479.png
|
2023-07-27 17:01:53.569499 |
421 |
59395015 |
Construction of Concrete road With Dust filling from Fakrul house to Main Road at Natun Momrejpur vi |
250000 |
Construction of Concrete road With Dust filling from Fakrul house to Main Road at Natun Momrejpur vi1 |
Completion of work |
-
latitude : 24.697714895009995,24.695979882963
Longitude : 87.9249067325145,87.92519071139395
file name : Image_27072023182140945.png
|
2023-07-27 18:21:41.044303 |
422 |
59472372 |
Construction of Concrete drain With CC Road from the house of Tohirul Sk to Jola at Tarapur village |
260000 |
Construction of Concrete drain With CC Road from the house of Tohirul Sk to Jola at Tarapur village1 |
Roof laid |
-
latitude : 24.7090141,24.7090145
Longitude : 87.9194845,87.9194849
file name : Image_18082023145215169.png
|
2023-08-18 14:52:15.286425 |
423 |
59472372 |
Construction of Concrete drain With CC Road from the house of Tohirul Sk to Jola at Tarapur village |
260000 |
Construction of Concrete drain With CC Road from the house of Tohirul Sk to Jola at Tarapur village1 |
Plinth level |
-
latitude : 24.709013,24.7090133
Longitude : 87.9194798,87.9194775
file name : Image_18082023144543177.png
|
2023-08-18 14:45:43.277557 |
424 |
59472372 |
Construction of Concrete drain With CC Road from the house of Tohirul Sk to Jola at Tarapur village |
260000 |
Construction of Concrete drain With CC Road from the house of Tohirul Sk to Jola at Tarapur village1 |
Completion of work |
-
latitude : 24.7090132,24.7090132
Longitude : 87.919482,87.919482
file name : Image_18082023143808051.png
|
2023-08-18 14:38:08.146886 |
425 |
59491111 |
Construction of New Tubwell with platform in front of Asikul at Dakhin Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Asikul at Dakhin Mahadebnagar village1 |
Plinth level |
-
latitude : 24.685124
Longitude : 87.9427093
file name : Image_22082023155857547.png
|
2023-08-22 15:58:57.638807 |
426 |
59491111 |
Construction of New Tubwell with platform in front of Asikul at Dakhin Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Asikul at Dakhin Mahadebnagar village1 |
Completion of work |
-
latitude : 24.6851203
Longitude : 87.9427346
file name : Image_22082023154753040.png
|
2023-08-22 15:47:53.13287 |
427 |
59464557 |
Construction of Concrete drain With CC road from the house of Chinmoy Das to Bagmari river at Madhya |
260000 |
Construction of Concrete drain With CC road from the house of Chinmoy Das to Bagmari river at Madhya1 |
Plinth level |
-
latitude : 24.69076265115291,24.69073612242937
Longitude : 87.93873645365238,87.93870225548744
file name : Image_07082023112555651.png
|
2023-08-07 11:25:55.754538 |
428 |
59464557 |
Construction of Concrete drain With CC road from the house of Chinmoy Das to Bagmari river at Madhya |
260000 |
Construction of Concrete drain With CC road from the house of Chinmoy Das to Bagmari river at Madhya1 |
Completion of work |
-
latitude : 24.690756490454078,24.690756490454078
Longitude : 87.93863645754755,87.93863645754755
file name : Image_25072023134756093.png
|
2023-07-25 13:47:56.200353 |
429 |
59470402 |
Construction of Concrete drain With CC Road from Main Road to Abdul Hamid house at Nishindrapara vi |
260000 |
Construction of Concrete drain With CC Road from Main Road to Abdul Hamid house at Nishindrapara vi1 |
Completion of work |
-
latitude : 24.68468,24.684670390561223
Longitude : 87.9347664,87.93464030139148
file name : Image_27072023170737387.png
|
2023-07-27 17:07:37.494379 |
430 |
59475871 |
Construction of Concrete drain With CC Road from Main Road to Tarikul house at Dakhin Mahadebnagar |
260000 |
Construction of Concrete drain With CC Road from Main Road to Tarikul house at Dakhin Mahadebnagar 1 |
Completion of work |
-
latitude : 24.6835938,24.6832577
Longitude : 87.9395587,87.9393945
file name : Image_27072023172129994.png
|
2023-07-27 17:21:30.126031 |
431 |
59475871 |
Construction of Concrete drain With CC Road from Main Road to Tarikul house at Dakhin Mahadebnagar |
260000 |
Construction of Concrete drain With CC Road from Main Road to Tarikul house at Dakhin Mahadebnagar 1 |
Completion of work |
-
latitude : 24.708896898664534,24.708910561166704
Longitude : 87.91960970498621,87.91962881572545
file name : Image_29072023101200740.png
|
2023-07-29 10:12:00.876171 |
432 |
59389492 |
Construction of Concrete road With Dust filling from Main Road to Sridam Pal house at Ankura village |
200000 |
Construction of Concrete road With Dust filling from Main Road to Sridam Pal house at Ankura village1 |
Completion of work |
-
latitude : 24.6834334731102,24.683408997952938
Longitude : 87.93011700734496,87.93012320995331
file name : Image_28072023175016063.png
|
2023-07-28 17:50:16.156863 |
433 |
59390275 |
Construction of Concrete road With Dust filling from Pintu Sk to Samaun Sk house at Uttar Mahadebnag |
200000 |
Construction of Concrete road With Dust filling from Pintu Sk to Samaun Sk house at Uttar Mahadebnag1 |
Completion of work |
-
latitude : 24.6945373,24.693773430772126
Longitude : 87.9443557,87.94328095391393
file name : Image_30072023103622904.png
|
2023-07-30 10:36:23.013273 |
434 |
59392840 |
Construction of Concrete road With Dust filling from Yeasin Sk to Jakir Shop at Mahadebnagar villag |
200000 |
Construction of Concrete road With Dust filling from Yeasin Sk to Jakir Shop at Mahadebnagar villag1 |
Completion of work |
-
latitude : 24.6898031,24.6898031
Longitude : 87.9420978,87.9420978
file name : Image_26072023104856939.png
|
2023-07-26 10:48:57.044862 |
435 |
59456757 |
Construction of Concrete road With Dust filling from Seikh Sadhi to Esahak house at Gopal Nagar vill |
200000 |
Construction of Concrete road With Dust filling from Seikh Sadhi to Esahak house at Gopal Nagar vill1 |
Completion of work |
-
latitude : 24.68960653524846,24.68962363433093
Longitude : 87.92849938385189,87.92849158868194
file name : Image_29072023103443913.png
|
2023-07-29 10:34:44.010331 |
436 |
59460369 |
Construction of Concrete road With Dust filling from the house of Akbor Ali to Manjarul SK at Momrej |
200000 |
Construction of Concrete road With Dust filling from the house of Akbor Ali to Manjarul SK at Momrej1 |
Completion of work |
-
latitude : 24.694898198358715,24.69486282672733
Longitude : 87.93766750954092,87.93766398914158
file name : Image_27072023165052887.png
|
2023-07-27 16:50:52.98379 |
437 |
59470025 |
Construction of Concrete drain With CC Road from the house of Lahabor Sk to Natobar Ghosh at Madhya |
180000 |
Construction of Concrete drain With CC Road from the house of Lahabor Sk to Natobar Ghosh at Madhya1 |
Completion of work |
-
latitude : 24.6894135,24.6893618
Longitude : 87.9367662,87.9367325
file name : Image_28072023165405368.png
|
2023-07-28 16:54:05.46708 |
438 |
59474742 |
Construction of Concrete drain With CC Road from the house of Pronab Sarkar to N.H 34 at Per Ankura |
180000 |
Construction of Concrete drain With CC Road from the house of Pronab Sarkar to N.H 34 at Per Ankura1 |
Plinth level |
-
latitude : 24.680331624113023,24.68030819669366
Longitude : 87.92640767991543,87.92640809901059
file name : Image_01082023151145889.png
|
2023-08-01 15:11:45.997725 |
439 |
59474742 |
Construction of Concrete drain With CC Road from the house of Pronab Sarkar to N.H 34 at Per Ankura |
180000 |
Construction of Concrete drain With CC Road from the house of Pronab Sarkar to N.H 34 at Per Ankura1 |
Completion of work |
-
latitude : 24.680884745903313,24.680825024843216
Longitude : 87.92669350281358,87.92668595910072
file name : Image_02052023121320900.png
|
2023-05-02 12:13:21.051557 |
440 |
59491652 |
Construction of New Tubwell with platform in front of Bidhan Sarkar at Per Ankura village |
25000 |
Construction of New Tubwell with platform in front of Bidhan Sarkar at Per Ankura village1 |
Plinth level |
-
latitude : 24.689011168666184
Longitude : 87.92895334772766
file name : Image_21082023115530882.png
|
2023-08-21 11:55:30.990948 |
441 |
59491652 |
Construction of New Tubwell with platform in front of Bidhan Sarkar at Per Ankura village |
25000 |
Construction of New Tubwell with platform in front of Bidhan Sarkar at Per Ankura village1 |
Completion of work |
-
latitude : 24.688970893621445
Longitude : 87.92887103743851
file name : Image_19072023125827995.png
|
2023-07-19 12:58:28.091558 |
442 |
59495659 |
Construction of New Tubwell with platform in front of Ismail Sk at Tarapur village |
25000 |
Construction of New Tubwell with platform in front of Ismail Sk at Tarapur village1 |
Plinth level |
-
latitude : 24.710277314297855
Longitude : 87.91902121156454
file name : Image_14072023112735392.png
|
2023-07-14 11:27:35.516984 |
443 |
59495659 |
Construction of New Tubwell with platform in front of Ismail Sk at Tarapur village |
25000 |
Construction of New Tubwell with platform in front of Ismail Sk at Tarapur village1 |
Completion of work |
-
latitude : 24.710265160538256
Longitude : 87.9190649650991
file name : Image_18062023103037475.png
|
2023-06-18 10:30:37.561252 |
444 |
59495828 |
Construction of New Tubwell with platform in front of Khabarstan at Tarapur village |
25000 |
Construction of New Tubwell with platform in front of Khabarstan at Tarapur village1 |
Plinth level |
-
latitude : 24.708662
Longitude : 87.9195373
file name : Image_14072023110239050.png
|
2023-07-14 11:02:39.167266 |
445 |
59495828 |
Construction of New Tubwell with platform in front of Khabarstan at Tarapur village |
25000 |
Construction of New Tubwell with platform in front of Khabarstan at Tarapur village1 |
Completion of work |
-
latitude : 24.7090494
Longitude : 87.917877
file name : Image_18062023103457187.png
|
2023-06-18 10:34:57.280204 |
446 |
59492153 |
Construction of New Tubwell with platform in front of Sakil Ansary at Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Sakil Ansary at Momrejpur village1 |
Plinth level |
-
latitude : 24.69288415275514
Longitude : 87.93820990249515
file name : Image_14072023114751425.png
|
2023-07-14 11:47:51.516363 |
447 |
59492153 |
Construction of New Tubwell with platform in front of Sakil Ansary at Momrejpur village |
25000 |
Construction of New Tubwell with platform in front of Sakil Ansary at Momrejpur village1 |
Completion of work |
-
latitude : 24.6921271
Longitude : 87.941078
file name : Image_13062023095940680.png
|
2023-06-13 09:59:40.764148 |
448 |
59472784 |
Construction of Concrete drain With CC Road from the house of Asim Reja to Pond at Natun Momrejpur |
100000 |
Construction of Concrete drain With CC Road from the house of Asim Reja to Pond at Natun Momrejpur 1 |
Plinth level |
-
latitude : 24.69856662210077,24.698594198562205
Longitude : 87.92693314142525,87.92692769318819
file name : Image_14072023112741114.png
|
2023-07-14 11:27:41.211705 |
449 |
59472784 |
Construction of Concrete drain With CC Road from the house of Asim Reja to Pond at Natun Momrejpur |
100000 |
Construction of Concrete drain With CC Road from the house of Asim Reja to Pond at Natun Momrejpur 1 |
Plinth level |
-
latitude : 24.69856662210077,24.698594198562205
Longitude : 87.92693314142525,87.92692769318819
file name : Image_14072023112753327.png
|
2023-07-14 11:27:53.428519 |
450 |
59472784 |
Construction of Concrete drain With CC Road from the house of Asim Reja to Pond at Natun Momrejpur |
100000 |
Construction of Concrete drain With CC Road from the house of Asim Reja to Pond at Natun Momrejpur 1 |
Completion of work |
-
latitude : 24.6991032,24.698680783621967
Longitude : 87.9256666,87.92690690606833
file name : Image_18062023105852745.png
|
2023-06-18 10:58:52.85509 |
451 |
59472784 |
Construction of Concrete drain With CC Road from the house of Asim Reja to Pond at Natun Momrejpur |
100000 |
Construction of Concrete drain With CC Road from the house of Asim Reja to Pond at Natun Momrejpur 1 |
Completion of work |
-
latitude : 24.6994868,24.6994868
Longitude : 87.9265859,87.9265859
file name : Image_26062023095304515.png
|
2023-06-26 09:53:04.600586 |
452 |
59456241 |
Construction of Concrete road With Dust filling from Alauddin Sk to Main Road at Natun Momrejpur vil |
80000 |
Construction of Concrete road With Dust filling from Alauddin Sk to Main Road at Natun Momrejpur vil1 |
Plinth level |
-
latitude : 24.698590887710452,24.698590887710452
Longitude : 87.92696055024862,87.92696055024862
file name : Image_14072023112746163.png
|
2023-07-14 11:27:46.26734 |
453 |
59456241 |
Construction of Concrete road With Dust filling from Alauddin Sk to Main Road at Natun Momrejpur vil |
80000 |
Construction of Concrete road With Dust filling from Alauddin Sk to Main Road at Natun Momrejpur vil1 |
Plinth level |
-
latitude : 24.698590887710452,24.698590887710452
Longitude : 87.92696055024862,87.92696055024862
file name : Image_14072023112801045.png
|
2023-07-14 11:28:01.136223 |
454 |
59456241 |
Construction of Concrete road With Dust filling from Alauddin Sk to Main Road at Natun Momrejpur vil |
80000 |
Construction of Concrete road With Dust filling from Alauddin Sk to Main Road at Natun Momrejpur vil1 |
Completion of work |
-
latitude : 24.698724034242332,24.6994952
Longitude : 87.92690967209637,87.9271988
file name : Image_18062023110005626.png
|
2023-06-18 11:00:05.712705 |
455 |
59485833 |
Construction of New Tubwell with platform in front of Khalek Sk at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Khalek Sk at Madhya Mahadebnagar village1 |
Plinth level |
-
latitude : 24.689646055921912
Longitude : 87.93724237941206
file name : Image_20092023141641915.png
|
2023-09-20 14:16:42.002586 |
456 |
59485833 |
Construction of New Tubwell with platform in front of Khalek Sk at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Khalek Sk at Madhya Mahadebnagar village1 |
Plinth level |
-
latitude : 24.689646055921912
Longitude : 87.93724237941206
file name : Image_20092023141638122.png
|
2023-09-20 14:16:38.219665 |
457 |
59485833 |
Construction of New Tubwell with platform in front of Khalek Sk at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Khalek Sk at Madhya Mahadebnagar village1 |
Completion of work |
-
latitude : 24.689583401195705
Longitude : 87.93717524036765
file name : Image_16062023082412660.png
|
2023-06-16 08:24:12.797229 |
458 |
59486360 |
Construction of New Tubwell with platform in front of Majed at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Majed at Madhya Mahadebnagar village1 |
Plinth level |
-
latitude : 24.6898811
Longitude : 87.9370956
file name : Image_20092023140637519.png
|
2023-09-20 14:06:37.604719 |
459 |
59486360 |
Construction of New Tubwell with platform in front of Majed at Madhya Mahadebnagar village |
25000 |
Construction of New Tubwell with platform in front of Majed at Madhya Mahadebnagar village1 |
Completion of work |
-
latitude : 24.690044950693846
Longitude : 87.93677701614797
file name : Image_16062023081908820.png
|
2023-06-16 08:19:09.004853 |
460 |
70935814 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.69521147198975
Longitude : 87.92829126119614
file name : Image_05022024115915207.png
|
2024-02-05 11:59:15.270103 |
461 |
70935814 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.695199318230152
Longitude : 87.9283329192549
file name : Image_05022024115305448.png
|
2024-02-05 11:53:05.531658 |
462 |
70935814 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.6943775
Longitude : 87.9297598
file name : Image_03012024145232446.png
|
2024-01-03 14:52:32.533969 |
463 |
70935814 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.6943775
Longitude : 87.9297598
file name : Image_03012024145337051.png
|
2024-01-03 14:53:37.190231 |
464 |
70924511 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.683378068730235
Longitude : 87.93752669356763
file name : Image_19012024115917197.png
|
2024-01-19 11:59:17.28172 |
465 |
70924511 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.683253639377654
Longitude : 87.9375353269279
file name : Image_19012024115443128.png
|
2024-01-19 11:54:43.216853 |
466 |
70924511 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.68329173512757
Longitude : 87.937485370785
file name : Image_04012024115909657.png
|
2024-01-04 11:59:09.750778 |
467 |
70933522 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.6876537
Longitude : 87.9227003
file name : Image_05022024113515733.png
|
2024-02-05 11:35:15.831248 |
468 |
70933522 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.6876535
Longitude : 87.9227008
file name : Image_05022024112820377.png
|
2024-02-05 11:28:20.463912 |
469 |
70933522 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.690701505169272
Longitude : 87.9223061632365
file name : Image_03012024150756999.png
|
2024-01-03 15:07:57.090754 |
470 |
70941291 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.690454909577966
Longitude : 87.94042498804629
file name : Image_19012024113044693.png
|
2024-01-19 11:30:44.789257 |
471 |
70941291 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.69051840249449
Longitude : 87.9404139239341
file name : Image_19012024112548790.png
|
2024-01-19 11:25:48.882057 |
472 |
70941291 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.680436314083636
Longitude : 87.92207088321447
file name : Image_08012024153735540.png
|
2024-01-08 15:37:35.630155 |
473 |
70939445 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.691483746282756
Longitude : 87.942855656147
file name : Image_19012024114250687.png
|
2024-01-19 11:42:50.774211 |
474 |
70939445 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.69151488505304
Longitude : 87.94286839663982
file name : Image_19012024113906521.png
|
2024-01-19 11:39:06.615018 |
475 |
70939445 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.6853743
Longitude : 87.9417914
file name : Image_09012024105625963.png
|
2024-01-09 10:56:26.044992 |
476 |
69884128 |
Drainage Construction |
206000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.6923768799752
Longitude : 87.9378291964531
file name : Image_04032024111450095.png
|
2024-03-04 11:14:50.168253 |
477 |
69884128 |
Drainage Construction |
206000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.69475822057575
Longitude : 87.94319554232061
file name : Image_11012024120404801.png
|
2024-01-11 12:04:04.899904 |
478 |
70938761 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.690120765008032
Longitude : 87.94019498862326
file name : Image_19012024112419635.png
|
2024-01-19 11:24:19.723622 |
479 |
70938761 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.690178725868464
Longitude : 87.94020747765899
file name : Image_19012024112152363.png
|
2024-01-19 11:21:52.453795 |
480 |
70938761 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.69010743778199
Longitude : 87.94029909186065
file name : Image_08012024105243005.png
|
2024-01-08 10:52:43.11029 |
481 |
70901746 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.686624337919056
Longitude : 87.94108883477747
file name : Image_05022024163754854.png
|
2024-02-05 16:37:54.927964 |
482 |
70901746 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.68881239183247
Longitude : 87.93842640705407
file name : Image_05022024163410577.png
|
2024-02-05 16:34:10.653867 |
483 |
70901746 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.6853743
Longitude : 87.9417914
file name : Image_09012024105005962.png
|
2024-01-09 10:50:06.027802 |
484 |
69884694 |
Drainage Construction |
206000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.694796442054212
Longitude : 87.94318296946585
file name : Image_29012024124720490.png
|
2024-01-29 12:47:20.55758 |
485 |
69884694 |
Drainage Construction |
206000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.694830724038184
Longitude : 87.94316821731627
file name : Image_19012024141457768.png
|
2024-01-19 14:14:57.85935 |
486 |
69884694 |
Drainage Construction |
206000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.6945169
Longitude : 87.9427505
file name : Image_11012024115054322.png
|
2024-01-11 11:50:54.419903 |
487 |
70898830 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.685408
Longitude : 87.9421035
file name : Image_05022024164419901.png
|
2024-02-05 16:44:19.969408 |
488 |
70898830 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.68603232409805
Longitude : 87.94090535491705
file name : Image_05022024164033371.png
|
2024-02-05 16:40:33.440202 |
489 |
70898830 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.6853743
Longitude : 87.9417914
file name : Image_09012024104732132.png
|
2024-01-09 10:47:32.216257 |
490 |
70877256 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.6919045
Longitude : 87.9449998
file name : Image_05022024125239676.png
|
2024-02-05 12:52:39.757914 |
491 |
70877256 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.692601556889713
Longitude : 87.94387917034328
file name : Image_05022024124926201.png
|
2024-02-05 12:49:26.276223 |
492 |
70877256 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.692494478076696
Longitude : 87.94372879900038
file name : Image_08012024112611782.png
|
2024-01-08 11:26:11.882332 |
493 |
70846156 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.6941901
Longitude : 87.9407456
file name : Image_05022024123156540.png
|
2024-02-05 12:31:56.611584 |
494 |
70846156 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.693961227312684
Longitude : 87.9415212571621
file name : Image_05022024122631053.png
|
2024-02-05 12:26:31.120021 |
495 |
70846156 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.693923508748412
Longitude : 87.94149820692837
file name : Image_08012024113956050.png
|
2024-01-08 11:39:56.174626 |
496 |
70182986 |
Operation and Maintenance of drinking water supply system |
1710000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 24.6888416
Longitude : 87.9387004
file name : Image_29052024182850163.png
|
2024-05-29 18:28:50.247469 |
497 |
70182986 |
Operation and Maintenance of drinking water supply system |
1710000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 24.6888456
Longitude : 87.9387051
file name : Image_29052024182520435.png
|
2024-05-29 18:25:20.534414 |
498 |
70182986 |
Operation and Maintenance of drinking water supply system |
1710000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.6923106
Longitude : 87.9413958
file name : Image_09012024174938345.png
|
2024-01-09 17:49:38.419642 |
499 |
59479783 |
BIO- Diversity of Mahadebnagar G.P |
100000 |
BIO- Diversity of Mahadebnagar G.P34 |
|
-
latitude : 24.690810721367598
Longitude : 87.93874994851649
file name : Image_21112023133006014.png
|
2023-11-21 13:30:06.149762 |
500 |
59478803 |
Emergency Flood Protection of GP Area for All Sansad |
487820 |
Emergency Flood Protection of GP Area for All Sansad1 |
Completion of work |
-
latitude : 24.688761
Longitude : 87.9376149
file name : Image_25112023171511449.png
|
2023-11-25 17:15:11.531557 |
501 |
69879949 |
Drainage Construction |
213365 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.6977174
Longitude : 87.9290972
file name : Image_09032024082705034.png
|
2024-03-09 08:27:05.098768 |
502 |
69879949 |
Drainage Construction |
213365 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.6977174
Longitude : 87.9290972
file name : Image_09032024082702174.png
|
2024-03-09 08:27:02.238913 |
503 |
69879949 |
Drainage Construction |
213365 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.6977346
Longitude : 87.9290892
file name : Image_12022024122838406.png
|
2024-02-12 12:28:38.504736 |
504 |
69883101 |
Drainage Construction |
206000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.693172
Longitude : 87.9387168
file name : Image_23022024152645289.png
|
2024-02-23 15:26:45.362539 |
505 |
69885220 |
Drainage Construction |
206000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.690192556008697
Longitude : 87.93892898596823
file name : Image_15032024160822856.png
|
2024-03-15 16:08:22.95178 |
506 |
69886718 |
Drainage Construction |
206000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.6889575
Longitude : 87.9361111
file name : Image_06062024124809130.png
|
2024-06-06 12:48:09.196071 |
507 |
69886718 |
Drainage Construction |
206000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.6887429
Longitude : 87.9364379
file name : Image_09032024082710942.png
|
2024-03-09 08:27:11.001174 |
508 |
69886718 |
Drainage Construction |
206000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.689157558605075
Longitude : 87.93595458380878
file name : Image_12022024132608499.png
|
2024-02-12 13:26:08.573196 |
509 |
69886718 |
Drainage Construction |
206000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.689260236918926
Longitude : 87.93567303568125
file name : Image_12022024111549530.png
|
2024-02-12 11:15:49.601197 |
510 |
70173091 |
Drainage Construction |
206000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.690915537066758
Longitude : 87.93024181388319
file name : Image_09032024082707974.png
|
2024-03-09 08:27:08.043022 |
511 |
70173091 |
Drainage Construction |
206000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.69099118374288
Longitude : 87.93021725490689
file name : Image_12022024111601024.png
|
2024-02-12 11:16:01.094256 |
512 |
70173091 |
Drainage Construction |
206000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.69099118374288
Longitude : 87.93021725490689
file name : Image_12022024111555348.png
|
2024-02-12 11:15:55.419455 |
513 |
70959521 |
Construction of roads |
283000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.696325846016407,24.696325846016407
Longitude : 87.9255471099168,87.9255471099168
file name : Image_22022024112922659.png
|
2024-02-22 11:29:22.729566 |
514 |
70959521 |
Construction of roads |
283000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.69631406944245,24.69631406944245
Longitude : 87.92552690953016,87.92552690953016
file name : Image_22022024112452805.png
|
2024-02-22 11:24:52.880547 |
515 |
70959521 |
Construction of roads |
283000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.6962562,24.6962558
Longitude : 87.9255752,87.925567
file name : Image_12022024120243004.png
|
2024-02-12 12:02:43.069861 |
516 |
70962726 |
Construction of roads |
283000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.7081153,24.7081153
Longitude : 87.9189769,87.9189769
file name : Image_22022024110830943.png
|
2024-02-22 11:08:31.021827 |
517 |
70962726 |
Construction of roads |
283000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.7081153,24.7081153
Longitude : 87.9189769,87.9189769
file name : Image_22022024110253303.png
|
2024-02-22 11:02:53.373702 |
518 |
70962726 |
Construction of roads |
283000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.7081171,24.7081173
Longitude : 87.9189678,87.9189686
file name : Image_12022024114202574.png
|
2024-02-12 11:42:02.645873 |
519 |
70966992 |
Construction of roads |
283000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.692189376801252,24.69228803180158
Longitude : 87.94251870363951,87.94219750910997
file name : Image_03062024131837841.png
|
2024-06-03 13:18:37.909719 |
520 |
70966992 |
Construction of roads |
283000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.69230433460325,24.69230433460325
Longitude : 87.94257687404752,87.94257687404752
file name : Image_04032024110411019.png
|
2024-03-04 11:04:11.088217 |
521 |
70966992 |
Construction of roads |
283000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.6915099,24.6915099
Longitude : 87.9424293,87.9424293
file name : Image_20022024110634022.png
|
2024-02-20 11:06:34.106397 |
522 |
70967685 |
Construction of roads |
283000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.685386,24.685386
Longitude : 87.9407959,87.9407959
file name : Image_19022024103222043.png
|
2024-02-19 10:32:22.125685 |
523 |
70968387 |
Construction of roads |
283000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.6831028,24.6831028
Longitude : 87.9316838,87.9316838
file name : Image_31052024112111831.png
|
2024-05-31 11:21:11.899302 |
524 |
70968387 |
Construction of roads |
283000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.6827836,24.6827836,24.6827836
Longitude : 87.9319888,87.9319888,87.9319888
file name : Image_20022024113957870.png
|
2024-02-20 11:39:57.932731 |
525 |
70968387 |
Construction of roads |
283000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.6827836,24.6827836
Longitude : 87.9319888,87.9319888
file name : Image_20022024113339610.png
|
2024-02-20 11:33:39.684072 |
526 |
70968387 |
Construction of roads |
283000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.683109428733587,24.68339927494526,24.683419642969966
Longitude : 87.93151871301234,87.93167117983103,87.93166455812752
file name : Image_07022024121231898.png
|
2024-02-07 12:12:31.967638 |
527 |
70969035 |
Construction of roads |
283000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.681375757791102,24.68144507613033
Longitude : 87.92686466127634,87.92679525911808
file name : Image_28032024085611543.png
|
2024-03-28 08:56:11.627387 |
528 |
70969035 |
Construction of roads |
283000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.680846189148724,24.681003601290286
Longitude : 87.92653030715883,87.92662963271141
file name : Image_08022024114415860.png
|
2024-02-08 11:44:15.934205 |
529 |
70970461 |
Construction of roads |
283000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.688738295808434,24.68374062795192
Longitude : 87.93868079781532,87.9393779207021
file name : Image_06062024111625504.png
|
2024-06-06 11:16:25.567675 |
530 |
70970461 |
Construction of roads |
283000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.682993590831757,24.6846194
Longitude : 87.93925143778324,87.943079
file name : Image_20022024115642628.png
|
2024-02-20 11:56:42.712342 |
531 |
70970461 |
Construction of roads |
283000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.683286203071475,24.6833951
Longitude : 87.93922101147473,87.9394841
file name : Image_20022024114829891.png
|
2024-02-20 11:48:29.962556 |
532 |
70970461 |
Construction of roads |
283000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.68332652002573,24.683033656328917,24.68297737184912
Longitude : 87.93927398510277,87.93923844583333,87.9392204247415
file name : Image_08022024121913713.png
|
2024-02-08 12:19:13.795357 |
533 |
88601660 |
Creation of a new source of drinking water |
22000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.6806475
Longitude : 87.9400989
file name : Image_14122023112253333.png
|
2023-12-14 11:22:53.441887 |
534 |
88601660 |
Creation of a new source of drinking water |
22000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.6806475
Longitude : 87.9400989
file name : Image_14122023111724703.png
|
2023-12-14 11:17:24.796874 |
535 |
88601660 |
Creation of a new source of drinking water |
22000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.685089
Longitude : 87.9426807
file name : Image_08122023104202056.png
|
2023-12-08 10:42:02.148442 |
536 |
70202449 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.69742781482637
Longitude : 87.9284262098372
file name : Image_01022024130817341.png
|
2024-02-01 13:08:17.41285 |
537 |
70202449 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.69741293694824
Longitude : 87.9284278023988
file name : Image_01022024130005729.png
|
2024-02-01 13:00:05.798649 |
538 |
70202449 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.69741293694824
Longitude : 87.9284278023988
file name : Image_01022024130018274.png
|
2024-02-01 13:00:18.333371 |
539 |
70202449 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.697383055463433
Longitude : 87.92834800668061
file name : Image_03012024144235188.png
|
2024-01-03 14:42:35.282082 |
540 |
70215052 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.697365746833384
Longitude : 87.92861698195338
file name : Image_05022024110608792.png
|
2024-02-05 11:06:08.871083 |
541 |
70215052 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.697367046028376
Longitude : 87.92860734276474
file name : Image_01022024130000619.png
|
2024-02-01 13:00:00.678149 |
542 |
70215052 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.697367046028376
Longitude : 87.92860734276474
file name : Image_01022024130011219.png
|
2024-02-01 13:00:11.276069 |
543 |
70215052 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.69736386090517
Longitude : 87.92856937274337
file name : Image_03012024143914609.png
|
2024-01-03 14:39:14.695443 |
544 |
70207821 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.69756075181067
Longitude : 87.92594927363098
file name : Image_03012024143117804.png
|
2024-01-03 14:31:17.937419 |
545 |
70211279 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.697640128433704
Longitude : 87.92605069465935
file name : Image_14032024115831546.png
|
2024-03-14 11:58:31.620905 |
546 |
70211279 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.696214240975678
Longitude : 87.92398581281304
file name : Image_14032024113839119.png
|
2024-03-14 11:38:39.199644 |
547 |
70211279 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.696211768314242
Longitude : 87.92399394325912
file name : Image_14032024113447205.png
|
2024-03-14 11:34:47.28741 |
548 |
70211279 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.69619337003678
Longitude : 87.92390149086714
file name : Image_03012024143438127.png
|
2024-01-03 14:34:38.242288 |
549 |
70212274 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.69825732987374
Longitude : 87.92674186639488
file name : Image_05022024114902578.png
|
2024-02-05 11:49:02.656673 |
550 |
70212274 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.69828851055354
Longitude : 87.92666751891375
file name : Image_01022024125956459.png
|
2024-02-01 12:59:56.525506 |
551 |
70212274 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.698327067308128
Longitude : 87.9266494140029
file name : Image_03012024142332213.png
|
2024-01-03 14:23:32.327192 |
552 |
70226171 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.707730473019183
Longitude : 87.92053339071572
file name : Image_01022024115418209.png
|
2024-02-01 11:54:18.266397 |
553 |
70226171 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.707784955389798
Longitude : 87.92050120420754
file name : Image_03012024140519562.png
|
2024-01-03 14:05:19.678808 |
554 |
70260323 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.709679852239788
Longitude : 87.91938624344766
file name : Image_01022024113815979.png
|
2024-02-01 11:38:16.062495 |
555 |
70260323 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.70972972456366
Longitude : 87.91942949406803
file name : Image_01022024113322969.png
|
2024-02-01 11:33:23.050654 |
556 |
70260323 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.709695861674845
Longitude : 87.91943997144699
file name : Image_03012024135358688.png
|
2024-01-03 13:53:58.780473 |
557 |
70794354 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.694013907574117
Longitude : 87.9371793475002
file name : Image_12022024123846099.png
|
2024-02-12 12:38:46.193443 |
558 |
70794354 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.694004394114017
Longitude : 87.93713919818401
file name : Image_05022024121517388.png
|
2024-02-05 12:15:17.471801 |
559 |
70794354 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.6932479
Longitude : 87.9388036
file name : Image_09012024110609297.png
|
2024-01-09 11:06:09.394372 |
560 |
70809931 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.69179643318057
Longitude : 87.9385419934988
file name : Image_05022024122100421.png
|
2024-02-05 12:21:00.494171 |
561 |
70809931 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.6917111473158
Longitude : 87.93856873176992
file name : Image_09012024111505187.png
|
2024-01-09 11:15:05.289834 |
562 |
70850693 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.6888954
Longitude : 87.9397825
file name : Image_10012024145114032.png
|
2024-01-10 14:51:14.133904 |
563 |
70850693 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.6889359
Longitude : 87.939912
file name : Image_10012024144555959.png
|
2024-01-10 14:45:56.052499 |
564 |
70850693 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.6889562
Longitude : 87.93997
file name : Image_04012024135712800.png
|
2024-01-04 13:57:12.776756 |
565 |
70859950 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.47271364275366
Longitude : 88.03907110355794
file name : Image_24012024143727319.png
|
2024-01-24 14:37:27.40845 |
566 |
70859950 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.6887075
Longitude : 87.9375276
file name : Image_10012024145756199.png
|
2024-01-10 14:57:56.291555 |
567 |
70859950 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.6880703
Longitude : 87.9375639
file name : Image_04012024140144197.png
|
2024-01-04 14:01:44.182965 |
568 |
70859950 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.6880703
Longitude : 87.9375639
file name : Image_04012024140127171.png
|
2024-01-04 14:01:27.337535 |
569 |
70869139 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.688960500061512
Longitude : 87.93735662475228
file name : Image_08022024153406522.png
|
2024-02-08 15:34:06.60088 |
570 |
70869139 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.68893443234265
Longitude : 87.93740825727582
file name : Image_08022024153000521.png
|
2024-02-08 15:30:00.592789 |
571 |
70869139 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.689382696524262
Longitude : 87.93678179383278
file name : Image_04012024140148971.png
|
2024-01-04 14:01:49.078543 |
572 |
70869139 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.689382696524262
Longitude : 87.93678179383278
file name : Image_04012024140131664.png
|
2024-01-04 14:01:31.81691 |
573 |
70871848 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.689414254389703
Longitude : 87.93712444603443
file name : Image_12022024132205378.png
|
2024-02-12 13:22:05.45137 |
574 |
70871848 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.6886637
Longitude : 87.9374613
file name : Image_12022024131707196.png
|
2024-02-12 13:17:07.277493 |
575 |
70871848 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.688903377391398
Longitude : 87.93731588870287
file name : Image_04012024140153141.png
|
2024-01-04 14:01:53.128391 |
576 |
70871848 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.688903377391398
Longitude : 87.93731588870287
file name : Image_04012024140139044.png
|
2024-01-04 14:01:39.238054 |
577 |
70907839 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.684011614881456
Longitude : 87.93228364549577
file name : Image_11012024150100386.png
|
2024-01-11 15:01:00.495524 |
578 |
70907839 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.68401157297194
Longitude : 87.93224534019828
file name : Image_11012024145711188.png
|
2024-01-11 14:57:11.274061 |
579 |
70907839 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.6880408
Longitude : 87.9376894
file name : Image_04012024113843529.png
|
2024-01-04 11:38:43.644748 |
580 |
70911061 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.686905425041914
Longitude : 87.93064506724477
file name : Image_11012024145044296.png
|
2024-01-11 14:50:44.388454 |
581 |
70911061 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.686897797510028
Longitude : 87.9306554608047
file name : Image_11012024144752473.png
|
2024-01-11 14:47:52.557039 |
582 |
70911061 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.68695948831737
Longitude : 87.93051757849753
file name : Image_04012024113856722.png
|
2024-01-04 11:38:56.804854 |
583 |
70911061 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.68695948831737
Longitude : 87.93051757849753
file name : Image_04012024113851065.png
|
2024-01-04 11:38:51.149113 |
584 |
70914706 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.68049465212971
Longitude : 87.92208395898342
file name : Image_05022024111603283.png
|
2024-02-05 11:16:03.356447 |
585 |
70914706 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.680517492815852
Longitude : 87.9220622498542
file name : Image_05022024110614020.png
|
2024-02-05 11:06:14.097536 |
586 |
70914706 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.680517492815852
Longitude : 87.9220622498542
file name : Image_05022024110618972.png
|
2024-02-05 11:06:19.049608 |
587 |
70914706 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.684946364723146
Longitude : 87.93707055039704
file name : Image_04012024123924148.png
|
2024-01-04 12:39:24.237873 |
588 |
70914706 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.684946364723146
Longitude : 87.93707055039704
file name : Image_04012024123910386.png
|
2024-01-04 12:39:10.473532 |
589 |
70920651 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.687871
Longitude : 87.9376479
file name : Image_11012024151219226.png
|
2024-01-11 15:12:19.315705 |
590 |
70920651 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.6880436
Longitude : 87.9372188
file name : Image_11012024150617472.png
|
2024-01-11 15:06:17.559334 |
591 |
70920651 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.688017
Longitude : 87.9376349
file name : Image_04012024111637903.png
|
2024-01-04 11:16:37.985747 |
592 |
70922346 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.685016479343176
Longitude : 87.936732172966
file name : Image_08022024133454834.png
|
2024-02-08 13:34:54.897181 |
593 |
70922346 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.68500956427306
Longitude : 87.93676712550223
file name : Image_04012024123919362.png
|
2024-01-04 12:39:19.479152 |
594 |
70922346 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.68500956427306
Longitude : 87.93676712550223
file name : Image_04012024123914956.png
|
2024-01-04 12:39:15.055986 |
595 |
70922346 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.68500956427306
Longitude : 87.93676712550223
file name : Image_04012024123906249.png
|
2024-01-04 12:39:06.354387 |
596 |
70923808 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.683209718205035
Longitude : 87.93531445786357
file name : Image_19012024120830208.png
|
2024-01-19 12:08:30.296604 |
597 |
70923808 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.68322535045445
Longitude : 87.93535837903619
file name : Image_19012024120343494.png
|
2024-01-19 12:03:43.591409 |
598 |
70923808 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.6838733
Longitude : 87.935477
file name : Image_04012024115914468.png
|
2024-01-04 11:59:14.56088 |
599 |
70928665 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.68149779830128
Longitude : 87.93439647182822
file name : Image_19012024121907339.png
|
2024-01-19 12:19:07.420642 |
600 |
70928665 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.68155445996672
Longitude : 87.93447920121253
file name : Image_19012024121240143.png
|
2024-01-19 12:12:40.228176 |
601 |
70928665 |
Creation of a new source of drinking water |
25000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.6839998
Longitude : 87.9355516
file name : Image_04012024120323156.png
|
2024-01-04 12:03:23.247703 |
602 |
70960276 |
Construction of roads |
283000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.69693873077631,24.69694086816162
Longitude : 87.92579311877489,87.92575213126838
file name : Image_14032024115544585.png
|
2024-03-14 11:55:44.651782 |
603 |
69882121 |
Drainage Construction |
206000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.704130445607007
Longitude : 87.9187190439552
file name : Image_14032024103257432.png
|
2024-03-14 10:32:57.516883 |
604 |
70169088 |
Drainage Construction |
206000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.6880404
Longitude : 87.9385319
file name : Image_29052024143431794.png
|
2024-05-29 14:34:31.867763 |
605 |
70169088 |
Drainage Construction |
206000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.6880498
Longitude : 87.9385187
file name : Image_23052024094704872.png
|
2024-05-23 09:47:04.944754 |
606 |
70169088 |
Drainage Construction |
206000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.6877425
Longitude : 87.9385357
file name : Image_16042024171421017.png
|
2024-04-16 17:14:21.087862 |
607 |
70172167 |
Drainage Construction |
206000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.683919958770275
Longitude : 87.9348018206656
file name : Image_07042024122527761.png
|
2024-04-07 12:25:27.830341 |
608 |
70172167 |
Drainage Construction |
206000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.6840239
Longitude : 87.9352935
file name : Image_07042024122523086.png
|
2024-04-07 12:25:23.164515 |
609 |
70172167 |
Drainage Construction |
206000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.6840585
Longitude : 87.9353109
file name : Image_16032024105556120.png
|
2024-03-16 10:55:56.279501 |
610 |
70969686 |
Construction of roads |
283000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.686439181677997,24.68643633183092
Longitude : 87.93736291117966,87.93736232444644
file name : Image_29052024142907448.png
|
2024-05-29 14:29:07.513619 |
611 |
70969686 |
Construction of roads |
283000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.686450455337763,24.686450455337763
Longitude : 87.93733826838434,87.93733826838434
file name : Image_29052024142159964.png
|
2024-05-29 14:22:00.04276 |
612 |
70969686 |
Construction of roads |
283000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.6877964,24.686414245516062
Longitude : 87.9375775,87.93732963502407
file name : Image_23052024095042342.png
|
2024-05-23 09:50:42.404729 |
613 |
70969686 |
Construction of roads |
283000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.686509505845606,24.686450748704374
Longitude : 87.93724766001105,87.93730658479035
file name : Image_20052024131850447.png
|
2024-05-20 13:18:50.522124 |
614 |
70969686 |
Construction of roads |
283000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.68651009257883,24.686419861391187
Longitude : 87.93729862198234,87.93732225894928
file name : Image_20042024092329696.png
|
2024-04-20 09:23:29.767484 |
615 |
70971475 |
Construction of roads |
283000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.686004244722426,24.686087141744792
Longitude : 87.93479586951435,87.93484733439982
file name : Image_21032024145922048.png
|
2024-03-21 14:59:22.140772 |
616 |
70971475 |
Construction of roads |
283000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.68626433517784,24.686277913860977
Longitude : 87.93489561416209,87.93492243625224
file name : Image_12032024172032894.png
|
2024-03-12 17:20:32.97051 |
617 |
70973244 |
Construction of roads |
283000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.6858575,24.68586
Longitude : 87.9436636,87.943663
file name : Image_02062024153342858.png
|
2024-06-02 15:33:42.931531 |
618 |
70973244 |
Construction of roads |
283000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.688799064606428,24.68907394912094
Longitude : 87.9387547262013,87.94169493019581
file name : Image_18032024121324981.png
|
2024-03-18 12:13:25.051574 |
619 |
70973244 |
Construction of roads |
283000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.6892210515216,24.68916
Longitude : 87.94163223356009,87.9411349
file name : Image_13032024104637687.png
|
2024-03-13 10:46:37.756372 |
620 |
70974167 |
Construction of roads |
283000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.6917724,24.6917724
Longitude : 87.9410987,87.9410987
file name : Image_18032024121735712.png
|
2024-03-18 12:17:35.798236 |
621 |
70974167 |
Construction of roads |
283000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.6917969,24.6917786
Longitude : 87.941115,87.9411006
file name : Image_13032024110555384.png
|
2024-03-13 11:05:55.458352 |
622 |
89086903 |
Activities realted to Record keeping /Maintainance of data base |
420000 |
Activities realted to Record keeping /Maintainance of data base1 |
Completion of work |
-
latitude : 24.6951909
Longitude : 87.9404502
file name : Image_10062024153635446.png
|
2024-06-10 15:36:35.526753 |
623 |
88601617 |
Const of cc road from dilip sarkar house to Sesnath house at Par Ankura |
150000 |
Const of cc road from dilip sarkar house to Sesnath house at Par Ankura1 |
Plinth level |
-
latitude : 24.68086513224989,24.68117756769061
Longitude : 87.9266459774226,87.92672761715949
file name : Image_28032024085338063.png
|
2024-03-28 08:53:38.141238 |
624 |
88601617 |
Const of cc road from dilip sarkar house to Sesnath house at Par Ankura |
150000 |
Const of cc road from dilip sarkar house to Sesnath house at Par Ankura1 |
Completion of work |
-
latitude : 24.68089752830565,24.680911861360073
Longitude : 87.92663323692977,87.92666374705732
file name : Image_16032024103709950.png
|
2024-03-16 10:37:10.019493 |
625 |
99144016 |
Creation of a new source of drinking water |
1451865 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.688845
Longitude : 87.9387054
file name : Image_29052024175548758.png
|
2024-05-29 17:55:48.842179 |
626 |
99144016 |
Creation of a new source of drinking water |
1451865 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.6888431
Longitude : 87.9386983
file name : Image_29052024175129145.png
|
2024-05-29 17:51:29.250399 |