1 |
34978711 |
Pathway with PCC road from Kuddus house to pitch cc road |
199706 |
Pathway with PCC road from Kuddus house to pitch cc road1 |
Plinth level |
-
latitude : 24.07240786,24.07241266,24.07240104,24.07239957
Longitude : 88.49267709,88.49267923,88.49268608,88.49268731
file name : Image_11022021103946857.png
|
2021-02-11 10:39:46.936621 |
2 |
34978711 |
Pathway with PCC road from Kuddus house to pitch cc road |
199706 |
Pathway with PCC road from Kuddus house to pitch cc road1 |
Completion of work |
-
latitude : 24.07244449,24.07244391,24.07243972,24.07243971
Longitude : 88.49264921,88.49264887,88.49265371,88.4926537
file name : Image_02022021162509434.png
|
2021-02-02 16:25:09.51776 |
3 |
35021211 |
Pathway with pcc road from Amanulla house to pitch road |
199706 |
Pathway with pcc road from Amanulla house to pitch road1 |
Roof laid |
-
latitude : 24.10189163,24.10189179
Longitude : 88.44153996,88.44156517
file name : Image_12112021153448744.png
|
2021-11-12 15:34:48.859231 |
4 |
35021211 |
Pathway with pcc road from Amanulla house to pitch road |
199706 |
Pathway with pcc road from Amanulla house to pitch road1 |
Plinth level |
-
latitude : 24.10186888,24.10186879
Longitude : 88.44161969,88.44161956
file name : Image_14022021120457792.png
|
2021-02-14 12:04:57.87126 |
5 |
35021211 |
Pathway with pcc road from Amanulla house to pitch road |
199706 |
Pathway with pcc road from Amanulla house to pitch road1 |
Completion of work |
-
latitude : 24.10185359,24.10185094,24.10184956
Longitude : 88.44162789,88.44162403,88.44165384
file name : Image_02022021151536516.png
|
2021-02-02 15:15:36.597626 |
6 |
34600970 |
Pathway with PCC road from Asanuddin house to Rajammel house |
199706 |
Pathway with PCC road from Asanuddin house to Rajammel house 1 |
Roof laid |
-
latitude : 24.10770699,24.10768712,24.10768585
Longitude : 88.4420898,88.44209747,88.44209755
file name : Image_20112021122044088.png
|
2021-11-20 12:20:44.214183 |
7 |
34600970 |
Pathway with PCC road from Asanuddin house to Rajammel house |
199706 |
Pathway with PCC road from Asanuddin house to Rajammel house 1 |
Plinth level |
-
latitude : 24.10763636,24.10765231
Longitude : 88.44216126,88.44215376
file name : Image_21052021172141033.png
|
2021-05-21 17:21:41.194008 |
8 |
34600970 |
Pathway with PCC road from Asanuddin house to Rajammel house |
199706 |
Pathway with PCC road from Asanuddin house to Rajammel house 1 |
Completion of work |
-
latitude : 24.10763988,24.10763951
Longitude : 88.4420932,88.4420937
file name : Image_05052021161417887.png
|
2021-05-05 16:14:17.970371 |
9 |
34934599 |
pathway with pcc road from Lelin dokan to Israfil house |
249832 |
pathway with pcc road from Lelin dokan to Israfil house1 |
Plinth level |
-
latitude : 24.09235636,24.09235637
Longitude : 88.43635909,88.4363591
file name : Image_08092021120313873.png
|
2021-09-08 12:03:13.952499 |
10 |
34934599 |
pathway with pcc road from Lelin dokan to Israfil house |
249832 |
pathway with pcc road from Lelin dokan to Israfil house1 |
Completion of work |
-
latitude : 24.1075537,24.1075537
Longitude : 88.44209135,88.44209135
file name : Image_05052021163656191.png
|
2021-05-05 16:36:56.300505 |
11 |
34928703 |
pathway with pcc road from Asaruddin dokan to NGO Office |
99915 |
pathway with pcc road from Asaruddin dokan to NGO Office1 |
Roof laid |
-
latitude : 24.08353699,24.08353739
Longitude : 88.4749787,88.47498279
file name : Image_25102021134655933.png
|
2021-10-25 13:46:56.040927 |
12 |
34928703 |
pathway with pcc road from Asaruddin dokan to NGO Office |
99915 |
pathway with pcc road from Asaruddin dokan to NGO Office1 |
Plinth level |
-
latitude : 24.08347708,24.08347708
Longitude : 88.47504668,88.47504668
file name : Image_11022021155716981.png
|
2021-02-11 15:57:17.106641 |
13 |
34928703 |
pathway with pcc road from Asaruddin dokan to NGO Office |
99915 |
pathway with pcc road from Asaruddin dokan to NGO Office1 |
Completion of work |
-
latitude : 24.0835403,24.08416
Longitude : 88.47500864,88.4747497
file name : Image_02022021130055716.png
|
2021-02-02 13:00:55.802759 |
14 |
34942494 |
pathway with pcc road from Kasem hoiuse to Hasen house |
249832 |
pathway with pcc road from Kasem hoiuse to Hasen house1 |
Roof laid |
-
latitude : 24.0980174,24.09802419
Longitude : 88.43739956,88.43739473
file name : Image_13112021101836740.png
|
2021-11-13 10:18:36.858859 |
15 |
34942494 |
pathway with pcc road from Kasem hoiuse to Hasen house |
249832 |
pathway with pcc road from Kasem hoiuse to Hasen house1 |
Plinth level |
-
latitude : 24.09800272,24.0980028
Longitude : 88.4374361,88.43743598
file name : Image_14022021120501415.png
|
2021-02-14 12:05:01.477847 |
16 |
34942494 |
pathway with pcc road from Kasem hoiuse to Hasen house |
249832 |
pathway with pcc road from Kasem hoiuse to Hasen house1 |
Completion of work |
-
latitude : 24.09799095,24.09799072,24.09798989
Longitude : 88.43737531,88.43737544,88.43737477
file name : Image_02022021152226200.png
|
2021-02-02 15:22:26.290011 |
17 |
35004999 |
Pathway with pcc road from ICDS to CC road at South Tartipur |
149254 |
Pathway with pcc road from ICDS to CC road at South Tartipur1 |
Plinth level |
-
latitude : 24.08245218,24.08245311
Longitude : 88.47118848,88.47118828
file name : Image_19022021112223766.png
|
2021-02-19 11:22:23.855236 |
18 |
35004999 |
Pathway with pcc road from ICDS to CC road at South Tartipur |
149254 |
Pathway with pcc road from ICDS to CC road at South Tartipur1 |
Completion of work |
-
latitude : 24.08246111,24.08245927
Longitude : 88.47120049,88.47120658
file name : Image_02022021160213709.png
|
2021-02-02 16:02:13.797169 |
19 |
34969792 |
Pathway with PCC road from Dhalai road to Sariful house |
149254 |
Pathway with PCC road from Dhalai road to Sariful house1 |
Roof laid |
-
latitude : 24.08894472,24.08894048
Longitude : 88.45711078,88.45709592
file name : Image_13112021133204235.png
|
2021-11-13 13:32:04.343612 |
20 |
34969792 |
Pathway with PCC road from Dhalai road to Sariful house |
149254 |
Pathway with PCC road from Dhalai road to Sariful house1 |
Plinth level |
-
latitude : 24.0889257,24.0889257
Longitude : 88.45709008,88.45709008
file name : Image_21022021112908690.png
|
2021-02-21 11:29:08.78286 |
21 |
34969792 |
Pathway with PCC road from Dhalai road to Sariful house |
149254 |
Pathway with PCC road from Dhalai road to Sariful house1 |
Completion of work |
-
latitude : 24.08888214,24.08888205
Longitude : 88.45709909,88.45709873
file name : Image_02022021151517309.png
|
2021-02-02 15:15:17.418189 |
22 |
34957431 |
Construction Pilling Salballi from Hanif to Patari hse |
318515 |
Construction Pilling Salballi from Hanif to Patari hse1 |
Roof laid |
-
latitude : 24.08719136,24.08717108
Longitude : 88.44392325,88.44392052
file name : Image_13112021130914704.png
|
2021-11-13 13:09:14.824512 |
23 |
34957431 |
Construction Pilling Salballi from Hanif to Patari hse |
318515 |
Construction Pilling Salballi from Hanif to Patari hse1 |
Plinth level |
-
latitude : 24.0860276,24.0860276,24.0860276,24.08705835,24.08712681
Longitude : 88.4387225,88.4387225,88.4387225,88.44392693,88.44386449
file name : Image_13052021103952198.png
|
2021-05-13 10:39:52.31798 |
24 |
34957431 |
Construction Pilling Salballi from Hanif to Patari hse |
318515 |
Construction Pilling Salballi from Hanif to Patari hse1 |
Completion of work |
-
latitude : 24.08712848,24.08712848
Longitude : 88.44387312,88.44387312
file name : Image_05052021154415934.png
|
2021-05-05 15:44:16.034522 |
25 |
34947174 |
pathway with pcc road from Billal Sk house to Imam house |
319744 |
pathway with pcc road from Billal Sk house to Imam house1 |
Roof laid |
-
latitude : 24.10112047,24.10111622
Longitude : 88.46433807,88.46434571
file name : Image_07122021133620748.png
|
2021-12-07 13:36:20.841524 |
26 |
34947174 |
pathway with pcc road from Billal Sk house to Imam house |
319744 |
pathway with pcc road from Billal Sk house to Imam house1 |
Plinth level |
-
latitude : 24.10108086,24.10108086
Longitude : 88.46433675,88.46433675
file name : Image_19022021114800288.png
|
2021-02-19 11:48:00.392459 |
27 |
34947174 |
pathway with pcc road from Billal Sk house to Imam house |
319744 |
pathway with pcc road from Billal Sk house to Imam house1 |
Completion of work |
-
latitude : 24.10110798,24.10110858,24.10110987
Longitude : 88.46437355,88.4643733,88.46436796
file name : Image_02022021144611774.png
|
2021-02-02 14:46:11.883639 |
28 |
34971549 |
Pathway with PCC road from Jinnath Mondal house to Sohidul ho |
99915 |
Pathway with PCC road from Jinnath Mondal house to Sohidul ho1 |
Roof laid |
-
latitude : 24.0879023,24.08591144
Longitude : 88.4774732,88.47631585
file name : Image_27102021121855092.png
|
2021-10-27 12:18:55.254525 |
29 |
34971549 |
Pathway with PCC road from Jinnath Mondal house to Sohidul ho |
99915 |
Pathway with PCC road from Jinnath Mondal house to Sohidul ho1 |
Plinth level |
-
latitude : 24.08416,24.08593127,24.08593229,24.08593333,24.0859255,24.08592491
Longitude : 88.4747497,88.47636909,88.47636625,88.47636452,88.47635562,88.47635395
file name : Image_09022021115303723.png
|
2021-02-09 11:53:03.832541 |
30 |
34971549 |
Pathway with PCC road from Jinnath Mondal house to Sohidul ho |
99915 |
Pathway with PCC road from Jinnath Mondal house to Sohidul ho1 |
Completion of work |
-
latitude : 24.08595693,24.08595554,24.08594374
Longitude : 88.47632744,88.47632827,88.4763246
file name : Image_02022021144231106.png
|
2021-02-02 14:42:31.210268 |
31 |
34964972 |
pathway with pcc road from Lalmati road to Deeptubwell |
149254 |
pathway with pcc road from Lalmati road to Deeptubwell1 |
Roof laid |
-
latitude : 24.08535415,24.08535446
Longitude : 88.45592953,88.45593588
file name : Image_13112021132231042.png
|
2021-11-13 13:22:31.1534 |
32 |
34964972 |
pathway with pcc road from Lalmati road to Deeptubwell |
149254 |
pathway with pcc road from Lalmati road to Deeptubwell1 |
Plinth level |
-
latitude : 24.08540304,24.08540557
Longitude : 88.45596143,88.45596899
file name : Image_14022021120505061.png
|
2021-02-14 12:05:05.127493 |
33 |
34964972 |
pathway with pcc road from Lalmati road to Deeptubwell |
149254 |
pathway with pcc road from Lalmati road to Deeptubwell1 |
Completion of work |
-
latitude : 24.08537187,24.08537193
Longitude : 88.45592975,88.45593033
file name : Image_02022021144324572.png
|
2021-02-02 14:43:24.688896 |
34 |
34998517 |
Pathway with pcc road from Sader house to Abu house via Moulabox |
299564 |
Pathway with pcc road from Sader house to Abu house via Moulabox1 |
Roof laid |
-
latitude : 24.0734487,24.07342987
Longitude : 88.48254445,88.48250776
file name : Image_27102021164226955.png
|
2021-10-27 16:42:27.077337 |
35 |
34998517 |
Pathway with pcc road from Sader house to Abu house via Moulabox |
299564 |
Pathway with pcc road from Sader house to Abu house via Moulabox1 |
Plinth level |
-
latitude : 24.07343911,24.07343915,24.07342947,24.0734292
Longitude : 88.48257175,88.48257175,88.48256436,88.48256419
file name : Image_13022021122513209.png
|
2021-02-13 12:25:13.335611 |
36 |
34998517 |
Pathway with pcc road from Sader house to Abu house via Moulabox |
299564 |
Pathway with pcc road from Sader house to Abu house via Moulabox1 |
Completion of work |
-
latitude : 24.0733444,24.07334242
Longitude : 88.48257241,88.48261056
file name : Image_02022021161332330.png
|
2021-02-02 16:13:32.414642 |
37 |
35000608 |
Pathway with pcc road from Mamrej house to Arsed house |
199706 |
Pathway with pcc road from Mamrej house to Arsed house1 |
Roof laid |
-
latitude : 24.11060555,24.11060813
Longitude : 88.47405985,88.47405042
file name : Image_07122021132409730.png
|
2021-12-07 13:24:09.830018 |
38 |
35000608 |
Pathway with pcc road from Mamrej house to Arsed house |
199706 |
Pathway with pcc road from Mamrej house to Arsed house1 |
Plinth level |
-
latitude : 24.11058753,24.11058749,24.11058518,24.11058524
Longitude : 88.47407345,88.47407337,88.47407245,88.47407263
file name : Image_08022021155335173.png
|
2021-02-08 15:53:35.285367 |
39 |
35000608 |
Pathway with pcc road from Mamrej house to Arsed house |
199706 |
Pathway with pcc road from Mamrej house to Arsed house1 |
Completion of work |
-
latitude : 24.11056407,24.11056297,24.1105619
Longitude : 88.47403939,88.47403838,88.47404215
file name : Image_02022021144640912.png
|
2021-02-02 14:46:41.013233 |
40 |
35002016 |
Pathway with pcc road from Naidar house to Ajij Mondal house |
200000 |
Pathway with pcc road from Naidar house to Ajij Mondal house1 |
Roof laid |
-
latitude : 24.109289324842393,24.109307345934212
Longitude : 88.47371879965067,88.47366926260293
file name : Image_07052022105410601.png
|
2022-05-07 10:54:10.707358 |
41 |
35002016 |
Pathway with pcc road from Naidar house to Ajij Mondal house |
200000 |
Pathway with pcc road from Naidar house to Ajij Mondal house1 |
Plinth level |
-
latitude : 24.10941564012319,24.109401307068765
Longitude : 88.47360899671912,88.47363288514316
file name : Image_05042022155447956.png
|
2022-04-05 15:54:48.053351 |
42 |
35002016 |
Pathway with pcc road from Naidar house to Ajij Mondal house |
200000 |
Pathway with pcc road from Naidar house to Ajij Mondal house1 |
Completion of work |
-
latitude : 24.10934597,24.10934189
Longitude : 88.47363998,88.47362248
file name : Image_14122021153816440.png
|
2021-12-14 15:38:16.539827 |
43 |
34960673 |
Pathaway with PCC road from Jumma Masjit to Ramjan sk house |
200000 |
Pathaway with PCC road from Jumma Masjit to Ramjan sk house1 |
Roof laid |
-
latitude : 24.086580486036837,24.086679769679904
Longitude : 88.4447611682117,88.44474381767213
file name : Image_27042022130053913.png
|
2022-04-27 13:00:54.056217 |
44 |
34960673 |
Pathaway with PCC road from Jumma Masjit to Ramjan sk house |
200000 |
Pathaway with PCC road from Jumma Masjit to Ramjan sk house1 |
Plinth level |
-
latitude : 24.08665799,24.08664108,24.08664636,24.08665248
Longitude : 88.44463981,88.44472102,88.44471648,88.44472186
file name : Image_06122021154842810.png
|
2021-12-06 15:48:42.920043 |
45 |
34960673 |
Pathaway with PCC road from Jumma Masjit to Ramjan sk house |
200000 |
Pathaway with PCC road from Jumma Masjit to Ramjan sk house1 |
Completion of work |
-
latitude : 24.08667416,24.08666696
Longitude : 88.44469662,88.44469205
file name : Image_13112021132227563.png
|
2021-11-13 13:22:27.644717 |
46 |
34962330 |
pathway with pcc road from pitch rosd to Nuru Molla house |
140000 |
pathway with pcc road from pitch rosd to Nuru Molla house1 |
Roof laid |
-
latitude : 24.092845036648214,24.092426695860922
Longitude : 88.45103032886982,88.45316033810377
file name : Image_27042022124758196.png
|
2022-04-27 12:47:58.311654 |
47 |
34962330 |
pathway with pcc road from pitch rosd to Nuru Molla house |
140000 |
pathway with pcc road from pitch rosd to Nuru Molla house1 |
Plinth level |
-
latitude : 24.0525624,24.0525624
Longitude : 88.4843339,88.4843339
file name : Image_25112021131436384.png
|
2021-11-25 13:14:36.498529 |
48 |
34962330 |
pathway with pcc road from pitch rosd to Nuru Molla house |
140000 |
pathway with pcc road from pitch rosd to Nuru Molla house1 |
Completion of work |
-
latitude : 24.09246002,24.09245875
Longitude : 88.45320933,88.45321264
file name : Image_13112021130128049.png
|
2021-11-13 13:01:28.14795 |
49 |
34972731 |
Pathway with PCC road from Mominul mia house to Meghu MIa house |
110000 |
Pathway with PCC road from Mominul mia house to Meghu MIa house1 |
Roof laid |
-
latitude : 24.083383711986244,24.083328056149185
Longitude : 88.47689378075302,88.4769278112799
file name : Image_20042022114438032.png
|
2022-04-20 11:44:38.121966 |
50 |
34972731 |
Pathway with PCC road from Mominul mia house to Meghu MIa house |
110000 |
Pathway with PCC road from Mominul mia house to Meghu MIa house1 |
Plinth level |
-
latitude : 24.08340819,24.08343024
Longitude : 88.4769078,88.47692813
file name : Image_27112021121442868.png
|
2021-11-27 12:14:42.951575 |
51 |
34972731 |
Pathway with PCC road from Mominul mia house to Meghu MIa house |
110000 |
Pathway with PCC road from Mominul mia house to Meghu MIa house1 |
Completion of work |
-
latitude : 24.08458615,24.08336756
Longitude : 88.47512469,88.47687226
file name : Image_22112021145740147.png
|
2021-11-22 14:57:40.27246 |
52 |
34606080 |
Pathway with PCC road from Hamid house to Nasir Bagan house |
320000 |
Pathway with PCC road from Hamid house to Nasir Bagan house 1 |
Roof laid |
-
latitude : 24.109286600723863,24.10928056575358
Longitude : 88.44112920574844,88.44118385575712
file name : Image_19042022125203010.png
|
2022-04-19 12:52:03.114143 |
53 |
34606080 |
Pathway with PCC road from Hamid house to Nasir Bagan house |
320000 |
Pathway with PCC road from Hamid house to Nasir Bagan house 1 |
Plinth level |
-
latitude : 24.10941422,24.1094331
Longitude : 88.44103,88.44102009
file name : Image_17112021143124772.png
|
2021-11-17 14:31:24.885478 |
54 |
34606080 |
Pathway with PCC road from Hamid house to Nasir Bagan house |
320000 |
Pathway with PCC road from Hamid house to Nasir Bagan house 1 |
Completion of work |
-
latitude : 24.10923958,24.10924203
Longitude : 88.44114615,88.44112177
file name : Image_13112021101841933.png
|
2021-11-13 10:18:42.038079 |
55 |
39067570 |
Const of cover drain from Abul Hossain house to Santosh Salon at Sankarpur |
200000 |
Const of cover drain from Abul Hossain house to Santosh Salon at Sankarpur1 |
Roof laid |
-
latitude : 24.0934821870178,24.093504147604108
Longitude : 88.43846015632153,88.43846451491117
file name : Image_27042022115712020.png
|
2022-04-27 11:57:12.154777 |
56 |
39067570 |
Const of cover drain from Abul Hossain house to Santosh Salon at Sankarpur |
200000 |
Const of cover drain from Abul Hossain house to Santosh Salon at Sankarpur1 |
Plinth level |
-
latitude : 24.09351468,24.09351634
Longitude : 88.4384579,88.43845685
file name : Image_20112021114738831.png
|
2021-11-20 11:47:38.951191 |
57 |
39067570 |
Const of cover drain from Abul Hossain house to Santosh Salon at Sankarpur |
200000 |
Const of cover drain from Abul Hossain house to Santosh Salon at Sankarpur1 |
Plinth level |
-
latitude : 24.10927115,24.10925331
Longitude : 88.44113024,88.44114363
file name : Image_17112021140144223.png
|
2021-11-17 14:01:44.331613 |
58 |
39067570 |
Const of cover drain from Abul Hossain house to Santosh Salon at Sankarpur |
200000 |
Const of cover drain from Abul Hossain house to Santosh Salon at Sankarpur1 |
Completion of work |
-
latitude : 24.09383827,24.09383929
Longitude : 88.43831157,88.43830862
file name : Image_13112021112544443.png
|
2021-11-13 11:25:44.553697 |
59 |
34997993 |
Const of road protection wall near Fakir pond at Siddhinandi |
300000 |
Const of road protection wall near Fakir pond at Siddhinandi1 |
Roof laid |
-
latitude : 24.071361841633916,24.071376426145434
Longitude : 88.48243438638747,88.48240178078413
file name : Image_20042022113907801.png
|
2022-04-20 11:39:07.914193 |
60 |
34997993 |
Const of road protection wall near Fakir pond at Siddhinandi |
300000 |
Const of road protection wall near Fakir pond at Siddhinandi1 |
Plinth level |
-
latitude : 24.07137968,24.07143156
Longitude : 88.48247819,88.48245801
file name : Image_15112021114036137.png
|
2021-11-15 11:40:36.247114 |
61 |
34997993 |
Const of road protection wall near Fakir pond at Siddhinandi |
300000 |
Const of road protection wall near Fakir pond at Siddhinandi1 |
Completion of work |
-
latitude : 24.07138624,24.07137475
Longitude : 88.48247235,88.48248442
file name : Image_12112021142144246.png
|
2021-11-12 14:21:44.337275 |
62 |
61225382 |
CONSTRUCTION OF CC ROAD FROM DHARAMPUR KHANPARA CC ROAD TO MADRASHA AT DHARAMPUR |
198285 |
CONSTRUCTION OF CC ROAD FROM DHARAMPUR KHANPARA CC ROAD TO MADRASHA AT DHARAMPUR1 |
Roof laid |
-
latitude : 24.0851360745728,24.085275675170124
Longitude : 88.43943857587874,88.43947738409042
file name : Image_27042022130422591.png
|
2022-04-27 13:04:22.696834 |
63 |
61225382 |
CONSTRUCTION OF CC ROAD FROM DHARAMPUR KHANPARA CC ROAD TO MADRASHA AT DHARAMPUR |
198285 |
CONSTRUCTION OF CC ROAD FROM DHARAMPUR KHANPARA CC ROAD TO MADRASHA AT DHARAMPUR1 |
Plinth level |
-
latitude : 24.085180331021547,24.085174296051264,24.085188629105687
Longitude : 88.43940102495253,88.43940244987607,88.43938300386071
file name : Image_13042022112334703.png
|
2022-04-13 11:23:34.783237 |
64 |
61225382 |
CONSTRUCTION OF CC ROAD FROM DHARAMPUR KHANPARA CC ROAD TO MADRASHA AT DHARAMPUR |
198285 |
CONSTRUCTION OF CC ROAD FROM DHARAMPUR KHANPARA CC ROAD TO MADRASHA AT DHARAMPUR1 |
Completion of work |
-
latitude : 24.085205057635903,24.085209877230227
Longitude : 88.43938870355487,88.43936012126505
file name : Image_09042022154402573.png
|
2022-04-09 15:44:02.666988 |
65 |
39067838 |
Const of cover drain from Latib Ansary house to Rakib Ansary house at Rejlapara |
150000 |
Const of cover drain from Latib Ansary house to Rakib Ansary house at Rejlapara1 |
Roof laid |
-
latitude : 24.080663616769016,24.08064626622945
Longitude : 88.47914423793554,88.4791327547282
file name : Image_25042022120653201.png
|
2022-04-25 12:06:53.290753 |
66 |
39067838 |
Const of cover drain from Latib Ansary house to Rakib Ansary house at Rejlapara |
150000 |
Const of cover drain from Latib Ansary house to Rakib Ansary house at Rejlapara1 |
Plinth level |
-
latitude : 24.08065435476601,24.080651169642806
Longitude : 88.4791237860918,88.47914197482169
file name : Image_28032022155520612.png
|
2022-03-28 15:55:20.685848 |
67 |
39073959 |
Const of community toilet near Dakshinpara Maszid at Siddhinandi |
149686 |
Const of community toilet near Dakshinpara Maszid at Siddhinandi1 |
Roof laid |
-
latitude : 24.073501280508935
Longitude : 88.48148605786264
file name : Image_30042022172635830.png
|
2022-04-30 17:26:35.964658 |
68 |
39073959 |
Const of community toilet near Dakshinpara Maszid at Siddhinandi |
149686 |
Const of community toilet near Dakshinpara Maszid at Siddhinandi1 |
Plinth level |
-
latitude : 24.073179
Longitude : 88.4815898
file name : Image_27012022170018436.png
|
2022-01-27 17:00:18.558341 |
69 |
39073959 |
Const of community toilet near Dakshinpara Maszid at Siddhinandi |
149686 |
Const of community toilet near Dakshinpara Maszid at Siddhinandi1 |
Completion of work |
-
latitude : 24.07344203
Longitude : 88.48156762
file name : Image_03012022171819018.png
|
2022-01-03 17:18:19.118744 |
70 |
39073763 |
Const of cover drain near Sahid Molla house at Khamarmati Pulpara |
100000 |
Const of cover drain near Sahid Molla house at Khamarmati Pulpara1 |
Roof laid |
-
latitude : 24.092379086650908,24.092388600111008
Longitude : 88.45435165800154,88.45437915064394
file name : Image_27042022124802608.png
|
2022-04-27 12:48:02.728248 |
71 |
39073763 |
Const of cover drain near Sahid Molla house at Khamarmati Pulpara |
100000 |
Const of cover drain near Sahid Molla house at Khamarmati Pulpara1 |
Plinth level |
-
latitude : 24.09241116,24.09237299
Longitude : 88.45445233,88.45449754
file name : Image_25012022150411065.png
|
2022-01-25 15:04:11.195591 |
72 |
39073763 |
Const of cover drain near Sahid Molla house at Khamarmati Pulpara |
100000 |
Const of cover drain near Sahid Molla house at Khamarmati Pulpara1 |
Completion of work |
-
latitude : 24.09230186,24.09230184
Longitude : 88.45448042,88.45448034
file name : Image_05012022151305671.png
|
2022-01-05 15:13:05.772796 |
73 |
61251353 |
CONSTRUCTION OF CC ROAD FROM JALIL MONDAL HOUSE TO GIAS MONDALHOUSE AT MIDDLE TARTIPUR |
299354 |
CONSTRUCTION OF CC ROAD FROM JALIL MONDAL HOUSE TO GIAS MONDALHOUSE AT MIDDLE TARTIPUR1 |
Roof laid |
-
latitude : 24.08413234166801,24.084139969199896
Longitude : 88.47149952314794,88.4715065639466
file name : Image_22052022160506074.png
|
2022-05-22 16:05:06.208836 |
74 |
61251353 |
CONSTRUCTION OF CC ROAD FROM JALIL MONDAL HOUSE TO GIAS MONDALHOUSE AT MIDDLE TARTIPUR |
299354 |
CONSTRUCTION OF CC ROAD FROM JALIL MONDAL HOUSE TO GIAS MONDALHOUSE AT MIDDLE TARTIPUR1 |
Completion of work |
-
latitude : 24.084091731347144,24.08413728699088
Longitude : 88.47147915512323,88.4714584518224
file name : Image_23042022172423665.png
|
2022-04-23 17:24:23.76392 |
75 |
61251353 |
CONSTRUCTION OF CC ROAD FROM JALIL MONDAL HOUSE TO GIAS MONDALHOUSE AT MIDDLE TARTIPUR |
299354 |
CONSTRUCTION OF CC ROAD FROM JALIL MONDAL HOUSE TO GIAS MONDALHOUSE AT MIDDLE TARTIPUR1 |
Plinth level |
-
latitude : 24.084147680550814,24.084112853743136
Longitude : 88.47153422422707,88.47152777016163
file name : Image_25042022122934323.png
|
2022-04-25 12:29:34.407065 |
76 |
55512971 |
Installation of water treatment plant River side at Sankarpur |
1408185 |
Installation of water treatment plant River side at Sankarpur1 |
Roof laid |
-
latitude : 24.099216205067933
Longitude : 88.43727177008986
file name : Image_25052022153945514.png
|
2022-05-25 15:39:45.620603 |
77 |
55512971 |
Installation of water treatment plant River side at Sankarpur |
1408185 |
Installation of water treatment plant River side at Sankarpur1 |
Plinth level |
-
latitude : 24.099067552015185
Longitude : 88.43727638013661
file name : Image_27042022120808765.png
|
2022-04-27 12:08:08.894727 |
78 |
55512971 |
Installation of water treatment plant River side at Sankarpur |
1408185 |
Installation of water treatment plant River side at Sankarpur1 |
Completion of work |
-
latitude : 24.09927248954773
Longitude : 88.43732692301273
file name : Image_05042022163036569.png
|
2022-04-05 16:30:36.700525 |
79 |
55513304 |
Installation of water yreatment plant near Pry School at Sundalpur |
1408185 |
Installation of water yreatment plant near Pry School at Sundalpur1 |
Roof laid |
-
latitude : 24.071414479985833
Longitude : 88.49199503660202
file name : Image_26052022105527633.png
|
2022-05-26 10:55:27.762248 |
80 |
55513304 |
Installation of water yreatment plant near Pry School at Sundalpur |
1408185 |
Installation of water yreatment plant near Pry School at Sundalpur1 |
Plinth level |
-
latitude : 24.071507058106363
Longitude : 88.49197869189084
file name : Image_19042022161843107.png
|
2022-04-19 16:18:43.175571 |
81 |
55513304 |
Installation of water yreatment plant near Pry School at Sundalpur |
1408185 |
Installation of water yreatment plant near Pry School at Sundalpur1 |
Completion of work |
-
latitude : 24.07155990600586
Longitude : 88.49205806851387
file name : Image_05042022114208854.png
|
2022-04-05 11:42:08.949186 |
82 |
55513214 |
Installation of water treatment plant near Tartipur Gomoster Dhar at East Tartipur |
1408185 |
Installation of water treatment plant near Tartipur Gomoster Dhar at East Tartipur1 |
Roof laid |
-
latitude : 24.0846369
Longitude : 88.4752619
file name : Image_26052022111542737.png
|
2022-05-26 11:15:42.85677 |
83 |
55513214 |
Installation of water treatment plant near Tartipur Gomoster Dhar at East Tartipur |
1408185 |
Installation of water treatment plant near Tartipur Gomoster Dhar at East Tartipur1 |
Plinth level |
-
latitude : 24.084684415720403
Longitude : 88.47524296492338
file name : Image_21042022150728353.png
|
2022-04-21 15:07:28.472871 |
84 |
55513214 |
Installation of water treatment plant near Tartipur Gomoster Dhar at East Tartipur |
1408185 |
Installation of water treatment plant near Tartipur Gomoster Dhar at East Tartipur1 |
Completion of work |
-
latitude : 24.08467808738351
Longitude : 88.47524120472372
file name : Image_05042022122642193.png
|
2022-04-05 12:26:42.276611 |
85 |
65657657 |
Construction of Community Sanitary Complex |
915000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.087646580301225
Longitude : 88.44584838487208
file name : Image_08042023163955747.png
|
2023-04-08 16:39:55.846298 |
86 |
65657657 |
Construction of Community Sanitary Complex |
915000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.087620554491878
Longitude : 88.4459752868861
file name : Image_05122022122419239.png
|
2022-12-05 12:24:19.353912 |
87 |
65657657 |
Construction of Community Sanitary Complex |
915000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.087540633045137
Longitude : 88.44592549838126
file name : Image_24112022152911140.png
|
2022-11-24 15:29:11.245213 |
88 |
65657652 |
Construction of Community Sanitary Complex |
915000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.100024765357375
Longitude : 88.43330754898489
file name : Image_03052023115445137.png
|
2023-05-03 11:54:45.232356 |
89 |
65657652 |
Construction of Community Sanitary Complex |
915000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.100015126168728
Longitude : 88.43320797197521
file name : Image_16042023164810119.png
|
2023-04-16 16:48:10.209608 |
90 |
65657652 |
Construction of Community Sanitary Complex |
915000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.100005235522985
Longitude : 88.4332534018904
file name : Image_05122022121150219.png
|
2022-12-05 12:11:50.319768 |
91 |
65657652 |
Construction of Community Sanitary Complex |
915000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.100033356808126
Longitude : 88.43323605135083
file name : Image_29112022154810122.png
|
2022-11-29 15:48:10.23023 |
92 |
39065342 |
Const of community toilet near Hamdirpara Maszid at Hamdirpara |
273271 |
Const of community toilet near Hamdirpara Maszid at Hamdirpara1 |
Roof laid |
-
latitude : 24.107313165441155
Longitude : 88.43859996646643
file name : Image_16052022131106228.png
|
2022-05-16 13:11:06.333548 |
93 |
39065342 |
Const of community toilet near Hamdirpara Maszid at Hamdirpara |
273271 |
Const of community toilet near Hamdirpara Maszid at Hamdirpara1 |
Plinth level |
-
latitude : 24.107275111600757
Longitude : 88.43858789652586
file name : Image_10032022103350261.png
|
2022-03-10 10:33:50.359897 |
94 |
39065342 |
Const of community toilet near Hamdirpara Maszid at Hamdirpara |
273271 |
Const of community toilet near Hamdirpara Maszid at Hamdirpara1 |
Completion of work |
-
latitude : 24.1072847
Longitude : 88.438614
file name : Image_29012022124207524.png
|
2022-01-29 12:42:07.755545 |
95 |
39073919 |
Const of community toilet near Jumma Maszid Karikarpara at Siddhinandi |
150558 |
Const of community toilet near Jumma Maszid Karikarpara at Siddhinandi1 |
Roof laid |
-
latitude : 24.077545255422592
Longitude : 88.48017739132047
file name : Image_25042022114847555.png
|
2022-04-25 11:48:47.675837 |
96 |
39073919 |
Const of community toilet near Jumma Maszid Karikarpara at Siddhinandi |
150558 |
Const of community toilet near Jumma Maszid Karikarpara at Siddhinandi1 |
Plinth level |
-
latitude : 24.0777818
Longitude : 88.4805979
file name : Image_19012022160121126.png
|
2022-01-19 16:01:21.22674 |
97 |
39073919 |
Const of community toilet near Jumma Maszid Karikarpara at Siddhinandi |
150558 |
Const of community toilet near Jumma Maszid Karikarpara at Siddhinandi1 |
Completion of work |
-
latitude : 24.07757978
Longitude : 88.4802041
file name : Image_05012022122034091.png
|
2022-01-05 12:20:34.205978 |
98 |
39073670 |
Const of community toilet near Pulpara SSK at Khamarmati |
100000 |
Const of community toilet near Pulpara SSK at Khamarmati1 |
Roof laid |
-
latitude : 24.09345473628491
Longitude : 88.45002776943147
file name : Image_27042022124234049.png
|
2022-04-27 12:42:34.176594 |
99 |
39073670 |
Const of community toilet near Pulpara SSK at Khamarmati |
100000 |
Const of community toilet near Pulpara SSK at Khamarmati1 |
Plinth level |
-
latitude : 24.09340293612331
Longitude : 88.449902292341
file name : Image_10032022105315352.png
|
2022-03-10 10:53:15.464035 |
100 |
39073670 |
Const of community toilet near Pulpara SSK at Khamarmati |
100000 |
Const of community toilet near Pulpara SSK at Khamarmati1 |
Completion of work |
-
latitude : 24.0934246
Longitude : 88.44992093
file name : Image_25012022151612596.png
|
2022-01-25 15:16:12.706051 |
101 |
39072521 |
Const of cover drain from Abdul Hossain house to Najrul Ansary house at Middle Tartipur |
180000 |
Const of cover drain from Abdul Hossain house to Najrul Ansary house at Middle Tartipur1 |
Roof laid |
-
latitude : 24.0826124092564,24.082578378729522
Longitude : 88.47612180747092,88.47610018216074
file name : Image_30042022165443138.png
|
2022-04-30 16:54:43.269508 |
102 |
39072521 |
Const of cover drain from Abdul Hossain house to Najrul Ansary house at Middle Tartipur |
180000 |
Const of cover drain from Abdul Hossain house to Najrul Ansary house at Middle Tartipur1 |
Plinth level |
-
latitude : 24.0826312,24.08263065
Longitude : 88.47614716,88.47614842
file name : Image_25012022141057608.png
|
2022-01-25 14:10:57.708017 |
103 |
39067547 |
Const of cover drain from Biswanath Ghosh house to Bidhan Ghosh house at Sankarpur |
200000 |
Const of cover drain from Biswanath Ghosh house to Bidhan Ghosh house at Sankarpur1 |
Roof laid |
-
latitude : 24.09747574478388,24.097464471124113
Longitude : 88.43752934597433,88.43747972510755
file name : Image_27042022123123916.png
|
2022-04-27 12:31:24.025607 |
104 |
39067547 |
Const of cover drain from Biswanath Ghosh house to Bidhan Ghosh house at Sankarpur |
200000 |
Const of cover drain from Biswanath Ghosh house to Bidhan Ghosh house at Sankarpur1 |
Plinth level |
-
latitude : 24.09739305,24.09737249,24.097355
Longitude : 88.43761561,88.43759952,88.43759556
file name : Image_13012022121939476.png
|
2022-01-13 12:19:39.583153 |
105 |
39067547 |
Const of cover drain from Biswanath Ghosh house to Bidhan Ghosh house at Sankarpur |
200000 |
Const of cover drain from Biswanath Ghosh house to Bidhan Ghosh house at Sankarpur1 |
Completion of work |
-
latitude : 24.09745085,24.09744473
Longitude : 88.43766018,88.43771938
file name : Image_02012022113802962.png
|
2022-01-02 11:38:03.098718 |
106 |
39065530 |
Const of cover drain from Majid Mondal house to River side via Enamul house at Patharghata |
300000 |
Const of cover drain from Majid Mondal house to River side via Enamul house at Patharghata1 |
Roof laid |
-
latitude : 24.09293308854103,24.09292663447559
Longitude : 88.43682308681309,88.43685988336802
file name : Image_27042022115350708.png
|
2022-04-27 11:53:50.821073 |
107 |
39065530 |
Const of cover drain from Majid Mondal house to River side via Enamul house at Patharghata |
300000 |
Const of cover drain from Majid Mondal house to River side via Enamul house at Patharghata1 |
Plinth level |
-
latitude : 24.09296165,24.09296175
Longitude : 88.43688809,88.43688824
file name : Image_20012022094003348.png
|
2022-01-20 09:40:03.467099 |
108 |
39065530 |
Const of cover drain from Majid Mondal house to River side via Enamul house at Patharghata |
300000 |
Const of cover drain from Majid Mondal house to River side via Enamul house at Patharghata1 |
Completion of work |
-
latitude : 24.09291462,24.09292386
Longitude : 88.43675185,88.43672466
file name : Image_03012022121256755.png
|
2022-01-03 12:12:56.858236 |
109 |
39073885 |
Const of cover drain from Tulsipur maszid to Imam house at Tulsipur |
200000 |
Const of cover drain from Tulsipur maszid to Imam house at Tulsipur1 |
Roof laid |
-
latitude : 24.088468551635742,24.08840522635728
Longitude : 88.45698072575033,88.45960652455688
file name : Image_27042022133159958.png
|
2022-04-27 13:32:00.082478 |
110 |
39073885 |
Const of cover drain from Tulsipur maszid to Imam house at Tulsipur |
200000 |
Const of cover drain from Tulsipur maszid to Imam house at Tulsipur1 |
Plinth level |
-
latitude : 24.08834967,24.08834806
Longitude : 88.45948314,88.45949379
file name : Image_20012022112413532.png
|
2022-01-20 11:24:13.640995 |
111 |
39073885 |
Const of cover drain from Tulsipur maszid to Imam house at Tulsipur |
200000 |
Const of cover drain from Tulsipur maszid to Imam house at Tulsipur1 |
Completion of work |
-
latitude : 24.08842723,24.08836871
Longitude : 88.45950848,88.45949927
file name : Image_13012022140623378.png
|
2022-01-13 14:06:23.485482 |
112 |
34925189 |
Pathway with PCC road from Bablu Ansary to Raiful Islam |
60001 |
Pathway with PCC road from Bablu Ansary to Raiful Islam1 |
Roof laid |
-
latitude : 24.08524960745126,24.08521591220051
Longitude : 88.4747807867825,88.47480358555913
file name : Image_25042022123513601.png
|
2022-04-25 12:35:13.694882 |
113 |
34925189 |
Pathway with PCC road from Bablu Ansary to Raiful Islam |
60001 |
Pathway with PCC road from Bablu Ansary to Raiful Islam1 |
Plinth level |
-
latitude : 24.08512576,24.085133
Longitude : 88.47480069,88.47479338
file name : Image_08012022134157799.png
|
2022-01-08 13:41:57.898473 |
114 |
34925189 |
Pathway with PCC road from Bablu Ansary to Raiful Islam |
60001 |
Pathway with PCC road from Bablu Ansary to Raiful Islam1 |
Completion of work |
-
latitude : 24.08522074,24.08521679
Longitude : 88.47476454,88.47476423
file name : Image_03012022150854844.png
|
2022-01-03 15:08:54.946166 |
115 |
34970205 |
Pathway with PCC road from Babi mill to Jenarul house |
112088 |
Pathway with PCC road from Babi mill to Jenarul house1 |
Roof laid |
-
latitude : 24.08822392579168,24.088902273215353
Longitude : 88.45714417286217,88.45705683343112
file name : Image_30042022125043912.png
|
2022-04-30 12:50:44.030337 |
116 |
34970205 |
Pathway with PCC road from Babi mill to Jenarul house |
112088 |
Pathway with PCC road from Babi mill to Jenarul house1 |
Plinth level |
-
latitude : 24.08894329,24.08896989
Longitude : 88.45709467,88.45714173
file name : Image_19012022123723446.png
|
2022-01-19 12:37:23.579699 |
117 |
34970205 |
Pathway with PCC road from Babi mill to Jenarul house |
112088 |
Pathway with PCC road from Babi mill to Jenarul house1 |
Completion of work |
-
latitude : 24.08892621,24.08889975
Longitude : 88.45712081,88.45709505
file name : Image_05012022145236080.png
|
2022-01-05 14:52:36.207184 |
118 |
34967764 |
Pathway with PCC road from Dhalai road to Ramjan Mondal house |
229377 |
Pathway with PCC road from Dhalai road to Ramjan Mondal house1 |
Roof laid |
-
latitude : 24.085179534740746,24.08768266439438
Longitude : 88.43942457810044,88.45613976940513
file name : Image_27042022131054802.png
|
2022-04-27 13:10:54.945331 |
119 |
34967764 |
Pathway with PCC road from Dhalai road to Ramjan Mondal house |
229377 |
Pathway with PCC road from Dhalai road to Ramjan Mondal house1 |
Plinth level |
-
latitude : 24.0881438,24.0881449
Longitude : 88.4563881,88.4563896
file name : Image_19012022141514586.png
|
2022-01-19 14:15:14.679083 |
120 |
34967764 |
Pathway with PCC road from Dhalai road to Ramjan Mondal house |
229377 |
Pathway with PCC road from Dhalai road to Ramjan Mondal house1 |
Completion of work |
-
latitude : 24.08769572,24.0881685
Longitude : 88.45607934,88.4564283
file name : Image_05012022145754382.png
|
2022-01-05 14:57:54.504439 |
121 |
34999476 |
Pathway with pcc road from Somirul house to Intejar via H to S house |
274353 |
Pathway with pcc road from Somirul house to Intejar via H to S house1 |
Roof laid |
-
latitude : 24.072594358585775,24.07261707354337
Longitude : 88.48334566690028,88.48336913622916
file name : Image_25042022112751580.png
|
2022-04-25 11:27:51.71061 |
122 |
34999476 |
Pathway with pcc road from Somirul house to Intejar via H to S house |
274353 |
Pathway with pcc road from Somirul house to Intejar via H to S house1 |
Plinth level |
-
latitude : 24.07257592,24.07258964
Longitude : 88.48340803,88.48342322
file name : Image_19012022120214703.png
|
2022-01-19 12:02:14.787054 |
123 |
34999476 |
Pathway with pcc road from Somirul house to Intejar via H to S house |
274353 |
Pathway with pcc road from Somirul house to Intejar via H to S house1 |
Completion of work |
-
latitude : 24.07255473,24.07257333
Longitude : 88.48340626,88.48342858
file name : Image_03012022170226807.png
|
2022-01-03 17:02:26.895766 |
124 |
48110172 |
INSTALLATION OF SOLAR LIGHT AT SIDDHINANDI KABARSTHAN |
76390 |
INSTALLATION OF SOLAR LIGHT AT SIDDHINANDI KABARSTHAN1 |
Roof laid |
-
latitude : 24.075359674170613
Longitude : 88.47703442908823
file name : Image_01032023125515855.png
|
2023-03-01 12:55:15.940839 |
125 |
48110172 |
INSTALLATION OF SOLAR LIGHT AT SIDDHINANDI KABARSTHAN |
76390 |
INSTALLATION OF SOLAR LIGHT AT SIDDHINANDI KABARSTHAN1 |
Plinth level |
-
latitude : 24.075240986421704
Longitude : 88.47705446183681
file name : Image_04122022140232906.png
|
2022-12-04 14:02:33.004665 |
126 |
48110172 |
INSTALLATION OF SOLAR LIGHT AT SIDDHINANDI KABARSTHAN |
76390 |
INSTALLATION OF SOLAR LIGHT AT SIDDHINANDI KABARSTHAN1 |
Completion of work |
-
latitude : 24.075304521247745
Longitude : 88.47698195837438
file name : Image_27112022152238234.png
|
2022-11-27 15:22:38.331823 |
127 |
48100735 |
INSTALLATION OF SOLAR LIGHT RAMKRISHNAPUR OKTIA MASZID |
76390 |
INSTALLATION OF SOLAR LIGHT RAMKRISHNAPUR OKTIA MASZID1 |
Completion of work |
-
latitude : 24.099082932807505
Longitude : 88.461076291278
file name : Image_03122022154945592.png
|
2022-12-03 15:49:45.718128 |
128 |
48100735 |
INSTALLATION OF SOLAR LIGHT RAMKRISHNAPUR OKTIA MASZID |
76390 |
INSTALLATION OF SOLAR LIGHT RAMKRISHNAPUR OKTIA MASZID1 |
Plinth level |
-
latitude : 24.09909169189632
Longitude : 88.4610797278583
file name : Image_04122022154903273.png
|
2022-12-04 15:49:03.376432 |
129 |
48298305 |
CONSTRUCTION OF COVER DRAIN FROM ENAMUL HOUSE TO MAJED HOUSE AT KHAMARMATI |
97254 |
CONSTRUCTION OF COVER DRAIN FROM ENAMUL HOUSE TO MAJED HOUSE AT KHAMARMATI1 |
Roof laid |
-
latitude : 24.08765341155231,24.08760718535632
Longitude : 88.45665458589792,88.45663631334901
file name : Image_03072022175538584.png
|
2022-07-03 17:55:38.716978 |
130 |
48298305 |
CONSTRUCTION OF COVER DRAIN FROM ENAMUL HOUSE TO MAJED HOUSE AT KHAMARMATI |
97254 |
CONSTRUCTION OF COVER DRAIN FROM ENAMUL HOUSE TO MAJED HOUSE AT KHAMARMATI1 |
Plinth level |
-
latitude : 24.08765512984246,24.087629355490208
Longitude : 88.4566058870405,88.45663187094033
file name : Image_08062022145425768.png
|
2022-06-08 14:54:25.89969 |
131 |
48298305 |
CONSTRUCTION OF COVER DRAIN FROM ENAMUL HOUSE TO MAJED HOUSE AT KHAMARMATI |
97254 |
CONSTRUCTION OF COVER DRAIN FROM ENAMUL HOUSE TO MAJED HOUSE AT KHAMARMATI1 |
Completion of work |
-
latitude : 24.087636270560324,24.08763530664146
Longitude : 88.45663354732096,88.45668987371027
file name : Image_25052022152614744.png
|
2022-05-25 15:26:14.861961 |
132 |
48287551 |
PURCHASE AND DISTRIBUTION OF ONE TABLE AND TWO CHAIAR OF TWENTY NINE ICDS CENTER |
100000 |
PURCHASE AND DISTRIBUTION OF ONE TABLE AND TWO CHAIAR OF TWENTY NINE ICDS CENTER1 |
Roof laid |
-
latitude : 24.0845512
Longitude : 88.4752369
file name : Image_03032023132922747.png
|
2023-03-03 13:29:22.839229 |
133 |
48287551 |
PURCHASE AND DISTRIBUTION OF ONE TABLE AND TWO CHAIAR OF TWENTY NINE ICDS CENTER |
100000 |
PURCHASE AND DISTRIBUTION OF ONE TABLE AND TWO CHAIAR OF TWENTY NINE ICDS CENTER10 |
Completion of work |
-
latitude : 24.084676704369485
Longitude : 88.47507172264159
file name : Image_25042022132336621.png
|
2022-04-25 13:23:36.75965 |
134 |
48287551 |
PURCHASE AND DISTRIBUTION OF ONE TABLE AND TWO CHAIAR OF TWENTY NINE ICDS CENTER |
100000 |
PURCHASE AND DISTRIBUTION OF ONE TABLE AND TWO CHAIAR OF TWENTY NINE ICDS CENTER11 |
Plinth level |
-
latitude : 24.08462343737483
Longitude : 88.47510147839785
file name : Image_25042022132951042.png
|
2022-04-25 13:29:51.185826 |
135 |
48287549 |
PURCHASE AND DISTRIBUTION OF ONE TABLE AND TWO CHAIAR OF TWENTY NINE ICDS CENTER |
100000 |
PURCHASE AND DISTRIBUTION OF ONE TABLE AND TWO CHAIAR OF TWENTY NINE ICDS CENTER1 |
Roof laid |
-
latitude : 24.0845599
Longitude : 88.4752388
file name : Image_03032023132746998.png
|
2023-03-03 13:27:47.159274 |
136 |
48287549 |
PURCHASE AND DISTRIBUTION OF ONE TABLE AND TWO CHAIAR OF TWENTY NINE ICDS CENTER |
100000 |
PURCHASE AND DISTRIBUTION OF ONE TABLE AND TWO CHAIAR OF TWENTY NINE ICDS CENTER1 |
Plinth level |
-
latitude : 24.084650427103043
Longitude : 88.47506635822356
file name : Image_21042022133552720.png
|
2022-04-21 13:35:52.78843 |
137 |
48286172 |
PCC ROAD FROM MOTINUL ISLAM HOUSE TO HABIBUR HOUSE AT REJLAPARA |
149984 |
PCC ROAD FROM MOTINUL ISLAM HOUSE TO HABIBUR HOUSE AT REJLAPARA1 |
Roof laid |
-
latitude : 24.078845707699656,24.0788555983454
Longitude : 88.47812231630087,88.4781519882381
file name : Image_30042022171556290.png
|
2022-04-30 17:15:56.426844 |
138 |
48286172 |
PCC ROAD FROM MOTINUL ISLAM HOUSE TO HABIBUR HOUSE AT REJLAPARA |
149984 |
PCC ROAD FROM MOTINUL ISLAM HOUSE TO HABIBUR HOUSE AT REJLAPARA1 |
Plinth level |
-
latitude : 24.07885346096009,24.078859915025532
Longitude : 88.47815785557032,88.47809951752424
file name : Image_25042022120036095.png
|
2022-04-25 12:00:36.191593 |
139 |
48286172 |
PCC ROAD FROM MOTINUL ISLAM HOUSE TO HABIBUR HOUSE AT REJLAPARA |
149984 |
PCC ROAD FROM MOTINUL ISLAM HOUSE TO HABIBUR HOUSE AT REJLAPARA1 |
Completion of work |
-
latitude : 24.078881414607167,24.078896082937717
Longitude : 88.47813723608851,88.47815953195095
file name : Image_19042022154649193.png
|
2022-04-19 15:46:49.279982 |
140 |
48293657 |
CONSTRUCTION OF COMMUNITY TOILET AT HAMDIRPARA MASZID MORE |
230000 |
CONSTRUCTION OF COMMUNITY TOILET AT HAMDIRPARA MASZID MORE1 |
Roof laid |
-
latitude : 24.108854345977306
Longitude : 88.44163094647229
file name : Image_03072022172838639.png
|
2022-07-03 17:28:38.743648 |
141 |
48293657 |
CONSTRUCTION OF COMMUNITY TOILET AT HAMDIRPARA MASZID MORE |
230000 |
CONSTRUCTION OF COMMUNITY TOILET AT HAMDIRPARA MASZID MORE1 |
Plinth level |
-
latitude : 24.108866918832064
Longitude : 88.44162616878748
file name : Image_25052022155110355.png
|
2022-05-25 15:51:10.464589 |
142 |
48293657 |
CONSTRUCTION OF COMMUNITY TOILET AT HAMDIRPARA MASZID MORE |
230000 |
CONSTRUCTION OF COMMUNITY TOILET AT HAMDIRPARA MASZID MORE1 |
Completion of work |
-
latitude : 24.108897848054767
Longitude : 88.4416114166379
file name : Image_16052022133117364.png
|
2022-05-16 13:31:17.461905 |
143 |
48286890 |
PCC ROAD FROM PITCH ROAD TO NAJOR HOUSE AT SUNDALPUR |
74613 |
PCC ROAD FROM PITCH ROAD TO NAJOR HOUSE AT SUNDALPUR1 |
Roof laid |
-
latitude : 24.073295379057527,24.07327714841813
Longitude : 88.49381810054183,88.4938267339021
file name : Image_30042022162051792.png
|
2022-04-30 16:20:51.901114 |
144 |
48286890 |
PCC ROAD FROM PITCH ROAD TO NAJOR HOUSE AT SUNDALPUR |
74613 |
PCC ROAD FROM PITCH ROAD TO NAJOR HOUSE AT SUNDALPUR1 |
Plinth level |
-
latitude : 24.073247727937996,24.073203513398767
Longitude : 88.49384089931846,88.49383276887238
file name : Image_21042022111045905.png
|
2022-04-21 11:10:46.024264 |
145 |
48286890 |
PCC ROAD FROM PITCH ROAD TO NAJOR HOUSE AT SUNDALPUR |
74613 |
PCC ROAD FROM PITCH ROAD TO NAJOR HOUSE AT SUNDALPUR1 |
Completion of work |
-
latitude : 24.073292864486575,24.073292864486575,24.07330061774701
Longitude : 88.49385246634483,88.49385246634483,88.49384861066937
file name : Image_19042022162256022.png
|
2022-04-19 16:22:56.091848 |
146 |
48297741 |
CONSTRUCTION OF COMMUNITY TOILET AT SUNDALPUR FERRY GHAT |
149832 |
CONSTRUCTION OF COMMUNITY TOILET AT SUNDALPUR FERRY GHAT 1 |
Roof laid |
-
latitude : 24.0718092
Longitude : 88.4923236
file name : Image_17042023113849966.png
|
2023-04-17 11:38:50.30592 |
147 |
48297741 |
CONSTRUCTION OF COMMUNITY TOILET AT SUNDALPUR FERRY GHAT |
149832 |
CONSTRUCTION OF COMMUNITY TOILET AT SUNDALPUR FERRY GHAT 1 |
Plinth level |
-
latitude : 24.0697085
Longitude : 88.4900454
file name : Image_26052022105249533.png
|
2022-05-26 10:52:49.649958 |
148 |
48297741 |
CONSTRUCTION OF COMMUNITY TOILET AT SUNDALPUR FERRY GHAT |
149832 |
CONSTRUCTION OF COMMUNITY TOILET AT SUNDALPUR FERRY GHAT 1 |
Completion of work |
-
latitude : 24.071228108368814
Longitude : 88.49203946068883
file name : Image_22052022162953216.png
|
2022-05-22 16:29:53.337083 |
149 |
48283827 |
PCC ROAD FROM HARUN MASTER HOUSE TO PITCH ROAD AT SANKARPUR |
249711 |
PCC ROAD FROM HARUN MASTER HOUSE TO PITCH ROAD AT SANKARPUR1 |
Roof laid |
-
latitude : 24.102036296389997,24.102044720202684
Longitude : 88.4412710275501,88.44128066673875
file name : Image_25052022154346621.png
|
2022-05-25 15:43:46.740207 |
150 |
48283827 |
PCC ROAD FROM HARUN MASTER HOUSE TO PITCH ROAD AT SANKARPUR |
249711 |
PCC ROAD FROM HARUN MASTER HOUSE TO PITCH ROAD AT SANKARPUR1 |
Plinth level |
-
latitude : 24.102131137624383,24.102107668295503
Longitude : 88.44114546664059,88.44112241640687
file name : Image_22052022153005843.png
|
2022-05-22 15:30:05.947789 |
151 |
48283827 |
PCC ROAD FROM HARUN MASTER HOUSE TO PITCH ROAD AT SANKARPUR |
249711 |
PCC ROAD FROM HARUN MASTER HOUSE TO PITCH ROAD AT SANKARPUR1 |
Completion of work |
-
latitude : 24.10206387285143,24.102034997195005
Longitude : 88.44124026596546,88.4412036370486
file name : Image_27042022121546040.png
|
2022-04-27 12:15:46.154075 |
152 |
48294816 |
CONSTRUCTION OF COVER DRAIN FROM KALAM HOUSE TO POND AT DHARAMPUR |
218831 |
CONSTRUCTION OF COVER DRAIN FROM KALAM HOUSE TO POND AT DHARAMPUR1 |
Roof laid |
-
latitude : 24.089253307320178,24.08920867368579
Longitude : 88.44612917862833,88.44614326022565
file name : Image_16052022134415366.png
|
2022-05-16 13:44:15.46612 |
153 |
48294816 |
CONSTRUCTION OF COVER DRAIN FROM KALAM HOUSE TO POND AT DHARAMPUR |
218831 |
CONSTRUCTION OF COVER DRAIN FROM KALAM HOUSE TO POND AT DHARAMPUR1 |
Plinth level |
-
latitude : 24.089182815514505,24.089101469144225
Longitude : 88.4461354650557,88.44622355885804
file name : Image_27042022125330089.png
|
2022-04-27 12:53:30.194366 |
154 |
48294816 |
CONSTRUCTION OF COVER DRAIN FROM KALAM HOUSE TO POND AT DHARAMPUR |
218831 |
CONSTRUCTION OF COVER DRAIN FROM KALAM HOUSE TO POND AT DHARAMPUR1 |
Completion of work |
-
latitude : 24.08918943721801,24.08916718326509
Longitude : 88.44621048308909,88.44617343507707
file name : Image_19042022130644234.png
|
2022-04-19 13:06:44.320495 |
155 |
48284975 |
PCC ROAD FROM OLIUL MONDAL HOUSE TO PIYCH ROAD AT EAST TARTIPUR |
149623 |
PCC ROAD FROM OLIUL MONDAL HOUSE TO PIYCH ROAD AT EAST TARTIPUR1 |
Roof laid |
-
latitude : 24.086266416125,24.08625711221248
Longitude : 88.47238683141768,88.47242052666843
file name : Image_22052022160210770.png
|
2022-05-22 16:02:10.879788 |
156 |
48284975 |
PCC ROAD FROM OLIUL MONDAL HOUSE TO PIYCH ROAD AT EAST TARTIPUR |
149623 |
PCC ROAD FROM OLIUL MONDAL HOUSE TO PIYCH ROAD AT EAST TARTIPUR1 |
Plinth level |
-
latitude : 24.08622978720814,24.08622978720814,24.08633854240179
Longitude : 88.47239898517728,88.47239898517728,88.4723855741322
file name : Image_19042022143730708.png
|
2022-04-19 14:37:30.817601 |
157 |
48284975 |
PCC ROAD FROM OLIUL MONDAL HOUSE TO PIYCH ROAD AT EAST TARTIPUR |
149623 |
PCC ROAD FROM OLIUL MONDAL HOUSE TO PIYCH ROAD AT EAST TARTIPUR1 |
Completion of work |
-
latitude : 24.08624810166657,24.086219519376755
Longitude : 88.47239630296826,88.4723633620888
file name : Image_19042022132314447.png
|
2022-04-19 13:23:14.608332 |
158 |
48285962 |
PCC ROAD FROM AKALI HOUSE TO KETAB HOUSE AT SOUTH TARTIPUR |
149640 |
PCC ROAD FROM AKALI HOUSE TO KETAB HOUSE AT SOUTH TARTIPUR1 |
Roof laid |
-
latitude : 24.080716129392385,24.081936785951257
Longitude : 88.47911548800766,88.47593790851533
file name : Image_25042022120919562.png
|
2022-04-25 12:09:19.684587 |
159 |
48285962 |
PCC ROAD FROM AKALI HOUSE TO KETAB HOUSE AT SOUTH TARTIPUR |
149640 |
PCC ROAD FROM AKALI HOUSE TO KETAB HOUSE AT SOUTH TARTIPUR1 |
Plinth level |
-
latitude : 24.081895295530558,24.0819173399359
Longitude : 88.47596112638712,88.47599197179079
file name : Image_11042022112002506.png
|
2022-04-11 11:20:02.584299 |
160 |
48285962 |
PCC ROAD FROM AKALI HOUSE TO KETAB HOUSE AT SOUTH TARTIPUR |
149640 |
PCC ROAD FROM AKALI HOUSE TO KETAB HOUSE AT SOUTH TARTIPUR1 |
Completion of work |
-
latitude : 24.081924045458436,24.08194202464074
Longitude : 88.47596406005323,88.47600395791233
file name : Image_09042022165045030.png
|
2022-04-09 16:50:45.097037 |
161 |
48286996 |
PCC ROAD FROM ADHARI HOUSE TO JONI HOUSE AT SUNDALPUR |
69859 |
PCC ROAD FROM ADHARI HOUSE TO JONI HOUSE AT SUNDALPUR1 |
Roof laid |
-
latitude : 24.071443062275648,24.07145173754543
Longitude : 88.48986896686256,88.48991389386356
file name : Image_30042022162436605.png
|
2022-04-30 16:24:36.699574 |
162 |
48286996 |
PCC ROAD FROM ADHARI HOUSE TO JONI HOUSE AT SUNDALPUR |
69859 |
PCC ROAD FROM ADHARI HOUSE TO JONI HOUSE AT SUNDALPUR1 |
Plinth level |
-
latitude : 24.071407481096685,24.071400775574148
Longitude : 88.48995856940746,88.48998639732599
file name : Image_21042022111727370.png
|
2022-04-21 11:17:27.427345 |
163 |
48286996 |
PCC ROAD FROM ADHARI HOUSE TO JONI HOUSE AT SUNDALPUR |
69859 |
PCC ROAD FROM ADHARI HOUSE TO JONI HOUSE AT SUNDALPUR1 |
Completion of work |
-
latitude : 24.07167545054108,24.07163819298148
Longitude : 88.48998807370663,88.48996410146356
file name : Image_19042022160257896.png
|
2022-04-19 16:02:57.954684 |
164 |
48284327 |
PCC ROAD FROM ALAUDDI HOUSE TO JHUNU HOUSE AT KALUDIAR |
189821 |
PCC ROAD FROM ALAUDDI HOUSE TO JHUNU HOUSE AT KALUDIAR1 |
Roof laid |
-
latitude : 24.093565922230482,24.09354358445853
Longitude : 88.48809217102826,88.48809443414211
file name : Image_06012023154636040.png
|
2023-01-06 15:46:36.152957 |
165 |
48284327 |
PCC ROAD FROM ALAUDDI HOUSE TO JHUNU HOUSE AT KALUDIAR |
189821 |
PCC ROAD FROM ALAUDDI HOUSE TO JHUNU HOUSE AT KALUDIAR1 |
Plinth level |
-
latitude : 24.093564581125975,24.093656823970377
Longitude : 88.48814615048468,88.48807691596448
file name : Image_19042022141029387.png
|
2022-04-19 14:10:29.485505 |
166 |
48284327 |
PCC ROAD FROM ALAUDDI HOUSE TO JHUNU HOUSE AT KALUDIAR |
189821 |
PCC ROAD FROM ALAUDDI HOUSE TO JHUNU HOUSE AT KALUDIAR1 |
Completion of work |
-
latitude : 24.09363767132163,24.093678407371044
Longitude : 88.48808521404862,88.48812879994512
file name : Image_19042022134947528.png
|
2022-04-19 13:49:47.613559 |
167 |
48288204 |
PCC ROAD FROM MASUD MOLLA HOUSE TO REJAUL SK HOUSE AT MIDDLE TARTIPUR |
98913 |
PCC ROAD FROM MASUD MOLLA HOUSE TO REJAUL SK HOUSE AT MIDDLE TARTIPUR1 |
Roof laid |
-
latitude : 24.08528108149767,24.085275130346417
Longitude : 88.47182834520936,88.47170521505177
file name : Image_02052022113349501.png
|
2022-05-02 11:33:49.610833 |
168 |
48288204 |
PCC ROAD FROM MASUD MOLLA HOUSE TO REJAUL SK HOUSE AT MIDDLE TARTIPUR |
98913 |
PCC ROAD FROM MASUD MOLLA HOUSE TO REJAUL SK HOUSE AT MIDDLE TARTIPUR1 |
Plinth level |
-
latitude : 24.085297719575465,24.085349519737065
Longitude : 88.47171669825912,88.47175911068916
file name : Image_20042022115255849.png
|
2022-04-20 11:52:55.959317 |
169 |
48288204 |
PCC ROAD FROM MASUD MOLLA HOUSE TO REJAUL SK HOUSE AT MIDDLE TARTIPUR |
98913 |
PCC ROAD FROM MASUD MOLLA HOUSE TO REJAUL SK HOUSE AT MIDDLE TARTIPUR1 |
Completion of work |
-
latitude : 24.08532014116645,24.085298515856266
Longitude : 88.47173186950386,88.47173840738833
file name : Image_19042022144434074.png
|
2022-04-19 14:44:34.23565 |
170 |
48284202 |
PCC ROAD FROM AZAD HOUSE TO SAMSUDDI HOUSE AT TEKONA |
149623 |
PCC ROAD FROM AZAD HOUSE TO SAMSUDDI HOUSE AT TEKONA1 |
Roof laid |
-
latitude : 24.105712599121034,24.105774541385472
Longitude : 88.47004031762481,88.46996043808758
file name : Image_07052022105018586.png
|
2022-05-07 10:50:18.711379 |
171 |
48284202 |
PCC ROAD FROM AZAD HOUSE TO SAMSUDDI HOUSE AT TEKONA |
149623 |
PCC ROAD FROM AZAD HOUSE TO SAMSUDDI HOUSE AT TEKONA1 |
Plinth level |
-
latitude : 24.10582009702921,24.10579570569098
Longitude : 88.47001131623983,88.46999740228057
file name : Image_07042022121120094.png
|
2022-04-07 12:11:20.156043 |
172 |
48284202 |
PCC ROAD FROM AZAD HOUSE TO SAMSUDDI HOUSE AT TEKONA |
149623 |
PCC ROAD FROM AZAD HOUSE TO SAMSUDDI HOUSE AT TEKONA1 |
Completion of work |
-
latitude : 24.105788581073284,24.105803333222866
Longitude : 88.4699990786612,88.46997259184718
file name : Image_05042022154735284.png
|
2022-04-05 15:47:35.361758 |
173 |
48295595 |
CONSTRUCTION OF COMMUNITY TOILET AT EAST TARTIPUR PALLI MANGAL SAMITY PARK |
230000 |
CONSTRUCTION OF COMMUNITY TOILET AT EAST TARTIPUR PALLI MANGAL SAMITY PARK1 |
Plinth level |
-
latitude : 24.087253217585385
Longitude : 88.47262839786708
file name : Image_19052022130947559.png
|
2022-05-19 13:09:47.671527 |
174 |
48295595 |
CONSTRUCTION OF COMMUNITY TOILET AT EAST TARTIPUR PALLI MANGAL SAMITY PARK |
230000 |
CONSTRUCTION OF COMMUNITY TOILET AT EAST TARTIPUR PALLI MANGAL SAMITY PARK1 |
Completion of work |
-
latitude : 24.087251164019108
Longitude : 88.47273015417159
file name : Image_19042022143032927.png
|
2022-04-19 14:30:33.035142 |
175 |
48299157 |
CONSTRUCTION OF COVER DRAIN FROM KALAM HOUSE TO MANIRUL HOUSE AT KHAMARMATI |
69049 |
CONSTRUCTION OF COVER DRAIN FROM KALAM HOUSE TO MANIRUL HOUSE AT KHAMARMATI1 |
Roof laid |
-
latitude : 24.088256070390344,24.08829747699201
Longitude : 88.45695138908923,88.45697770826519
file name : Image_13042022113438821.png
|
2022-04-13 11:34:38.88933 |
176 |
48299157 |
CONSTRUCTION OF COVER DRAIN FROM KALAM HOUSE TO MANIRUL HOUSE AT KHAMARMATI |
69049 |
CONSTRUCTION OF COVER DRAIN FROM KALAM HOUSE TO MANIRUL HOUSE AT KHAMARMATI1 |
Plinth level |
-
latitude : 24.08816839568317,24.08816189970821
Longitude : 88.45689808018506,88.4568627923727
file name : Image_05042022153609157.png
|
2022-04-05 15:36:09.231082 |
177 |
48299157 |
CONSTRUCTION OF COVER DRAIN FROM KALAM HOUSE TO MANIRUL HOUSE AT KHAMARMATI |
69049 |
CONSTRUCTION OF COVER DRAIN FROM KALAM HOUSE TO MANIRUL HOUSE AT KHAMARMATI1 |
Completion of work |
-
latitude : 24.08820946700871,24.088157918304205
Longitude : 88.45779963769019,88.45685885287821
file name : Image_29032022163750933.png
|
2022-03-29 16:37:51.015887 |
178 |
61251257 |
CONSTRUCTION OF CC ROAD FROM SAJED BISWAS HOUSE TO PIARUL HOUSE AT SAUTH TARTIPUR |
248787 |
CONSTRUCTION OF CC ROAD FROM SAJED BISWAS HOUSE TO PIARUL HOUSE AT SAUTH TARTIPUR1 |
Roof laid |
-
latitude : 24.081051237881184,24.081036988645792
Longitude : 88.47481523640454,88.47480023279786
file name : Image_25042022121202651.png
|
2022-04-25 12:12:02.765549 |
179 |
61251257 |
CONSTRUCTION OF CC ROAD FROM SAJED BISWAS HOUSE TO PIARUL HOUSE AT SAUTH TARTIPUR |
248787 |
CONSTRUCTION OF CC ROAD FROM SAJED BISWAS HOUSE TO PIARUL HOUSE AT SAUTH TARTIPUR1 |
Plinth level |
-
latitude : 24.08104055095464,24.081034725531936
Longitude : 88.47494867630303,88.47493861801922
file name : Image_07042022160544583.png
|
2022-04-07 16:05:44.653406 |
180 |
61251257 |
CONSTRUCTION OF CC ROAD FROM SAJED BISWAS HOUSE TO PIARUL HOUSE AT SAUTH TARTIPUR |
248787 |
CONSTRUCTION OF CC ROAD FROM SAJED BISWAS HOUSE TO PIARUL HOUSE AT SAUTH TARTIPUR1 |
Completion of work |
-
latitude : 24.081069510430098,24.081037659198046
Longitude : 88.4747984725982,88.47483552061021
file name : Image_05042022120113542.png
|
2022-04-05 12:01:13.649953 |
181 |
61251948 |
REPAIRING OF TOILET OF DHARAMPUR GP |
200000 |
REPAIRING OF TOILET OF DHARAMPUR GP1 |
Roof laid |
-
latitude : 24.0846019
Longitude : 88.4752451
file name : Image_28022023132433038.png
|
2023-02-28 13:24:33.126836 |
182 |
61251948 |
REPAIRING OF TOILET OF DHARAMPUR GP |
200000 |
REPAIRING OF TOILET OF DHARAMPUR GP1 |
Plinth level |
-
latitude : 24.0846822
Longitude : 88.4751386
file name : Image_30112022142144330.png
|
2022-11-30 14:21:44.435964 |
183 |
61251948 |
REPAIRING OF TOILET OF DHARAMPUR GP |
200000 |
REPAIRING OF TOILET OF DHARAMPUR GP1 |
Completion of work |
-
latitude : 24.0846996
Longitude : 88.4751428
file name : Image_28102022155213207.png
|
2022-10-28 15:52:13.321789 |
184 |
61225931 |
CONSTRUCTION OF CC ROAD FROM ESA HOQUE LAND TO AMZAD LAND AT SIDDHINANDI |
100000 |
CONSTRUCTION OF CC ROAD FROM ESA HOQUE LAND TO AMZAD LAND AT SIDDHINANDI1 |
Roof laid |
-
latitude : 24.076235038228333,24.076224099844694
Longitude : 88.47978981211782,88.47974966280162
file name : Image_01032023125244990.png
|
2023-03-01 12:52:45.074848 |
185 |
61225931 |
CONSTRUCTION OF CC ROAD FROM ESA HOQUE LAND TO AMZAD LAND AT SIDDHINANDI |
100000 |
CONSTRUCTION OF CC ROAD FROM ESA HOQUE LAND TO AMZAD LAND AT SIDDHINANDI1 |
Plinth level |
-
latitude : 24.07588400412351,24.07589158974588
Longitude : 88.47982920706272,88.47984370775521
file name : Image_12082022114002091.png
|
2022-08-12 11:40:02.197601 |
186 |
61225931 |
CONSTRUCTION OF CC ROAD FROM ESA HOQUE LAND TO AMZAD LAND AT SIDDHINANDI |
100000 |
CONSTRUCTION OF CC ROAD FROM ESA HOQUE LAND TO AMZAD LAND AT SIDDHINANDI1 |
Completion of work |
-
latitude : 24.0761202480644,24.076174227520823
Longitude : 88.47977598197758,88.47974362783134
file name : Image_11082022162842533.png
|
2022-08-11 16:28:42.623414 |
187 |
61225752 |
CONSTRUCTION OF CC ROAD FROM ANARUL LAND TO ESA HOQUE LAND AT SIDDHINANDI |
100000 |
CONSTRUCTION OF CC ROAD FROM ANARUL LAND TO ESA HOQUE LAND AT SIDDHINANDI1 |
Roof laid |
-
latitude : 24.076330508105457,24.07625590916723
Longitude : 88.48013212904334,88.48011201247573
file name : Image_01032023125232747.png
|
2023-03-01 12:52:32.826616 |
188 |
61225752 |
CONSTRUCTION OF CC ROAD FROM ANARUL LAND TO ESA HOQUE LAND AT SIDDHINANDI |
100000 |
CONSTRUCTION OF CC ROAD FROM ANARUL LAND TO ESA HOQUE LAND AT SIDDHINANDI1 |
Plinth level |
-
latitude : 24.076191494241357,24.07625427469611
Longitude : 88.48013849928975,88.48011519759893
file name : Image_12082022122113293.png
|
2022-08-12 12:21:13.384936 |
189 |
61225752 |
CONSTRUCTION OF CC ROAD FROM ANARUL LAND TO ESA HOQUE LAND AT SIDDHINANDI |
100000 |
CONSTRUCTION OF CC ROAD FROM ANARUL LAND TO ESA HOQUE LAND AT SIDDHINANDI1 |
Completion of work |
-
latitude : 24.076219950802624,24.076245976611972
Longitude : 88.48007932305336,88.48008460365236
file name : Image_09082022152834052.png
|
2022-08-09 15:28:34.161967 |
190 |
61225581 |
CONSTRUCTION OF CC ROAD FROM SALEMUDDIN HOUSE TO FATE HOUSE AT KALUDIAR |
100000 |
CONSTRUCTION OF CC ROAD FROM SALEMUDDIN HOUSE TO FATE HOUSE AT KALUDIAR1 |
Roof laid |
-
latitude : 24.091154783964157,24.09115402959287
Longitude : 88.48979663103819,88.48983535543084
file name : Image_03052023132311050.png
|
2023-05-03 13:23:11.153149 |
191 |
61225581 |
CONSTRUCTION OF CC ROAD FROM SALEMUDDIN HOUSE TO FATE HOUSE AT KALUDIAR |
100000 |
CONSTRUCTION OF CC ROAD FROM SALEMUDDIN HOUSE TO FATE HOUSE AT KALUDIAR1 |
Plinth level |
-
latitude : 24.091162495315075,24.091178295202553
Longitude : 88.4897874109447,88.48982839845121
file name : Image_29112022141450304.png
|
2022-11-29 14:14:50.39192 |
192 |
61225581 |
CONSTRUCTION OF CC ROAD FROM SALEMUDDIN HOUSE TO FATE HOUSE AT KALUDIAR |
100000 |
CONSTRUCTION OF CC ROAD FROM SALEMUDDIN HOUSE TO FATE HOUSE AT KALUDIAR1 |
Completion of work |
-
latitude : 24.09117519389838,24.091133871115744
Longitude : 88.48978045396507,88.48978137597442
file name : Image_28092022135422338.png
|
2022-09-28 13:54:22.463938 |
193 |
48099156 |
INSATALLATION OF SOLAR LIGHT AT PATHARGHATA CLUB MORE |
76390 |
INSATALLATION OF SOLAR LIGHT AT PATHARGHATA CLUB MORE1 |
Plinth level |
-
latitude : 24.09479684662074
Longitude : 88.43529892154038
file name : Image_04122022165013392.png
|
2022-12-04 16:50:13.507592 |
194 |
48099156 |
INSATALLATION OF SOLAR LIGHT AT PATHARGHATA CLUB MORE |
76390 |
INSATALLATION OF SOLAR LIGHT AT PATHARGHATA CLUB MORE1 |
Completion of work |
-
latitude : 24.094793954864144
Longitude : 88.43531643971801
file name : Image_29102022170810114.png
|
2022-10-29 17:08:10.2074 |
195 |
48285586 |
PCC ROAD FROM ABU SIDDIK HOUSE TO TARJEM HOUSE AT MIDDLE TARTIPUR |
100000 |
PCC ROAD FROM ABU SIDDIK HOUSE TO TARJEM HOUSE AT MIDDLE TARTIPUR1 |
Roof laid |
-
latitude : 24.08407568000257,24.08406231086701
Longitude : 88.47147043794394,88.47146566025913
file name : Image_01032023131120432.png
|
2023-03-01 13:11:20.522696 |
196 |
48285586 |
PCC ROAD FROM ABU SIDDIK HOUSE TO TARJEM HOUSE AT MIDDLE TARTIPUR |
100000 |
PCC ROAD FROM ABU SIDDIK HOUSE TO TARJEM HOUSE AT MIDDLE TARTIPUR1 |
Plinth level |
-
latitude : 24.084037458524108,24.08401994034648
Longitude : 88.47149223089218,88.4714809153229
file name : Image_28112022124534193.png
|
2022-11-28 12:45:34.310375 |
197 |
48285586 |
PCC ROAD FROM ABU SIDDIK HOUSE TO TARJEM HOUSE AT MIDDLE TARTIPUR |
100000 |
PCC ROAD FROM ABU SIDDIK HOUSE TO TARJEM HOUSE AT MIDDLE TARTIPUR1 |
Completion of work |
-
latitude : 24.08406029921025,24.084070399403572
Longitude : 88.47144520841539,88.47142836079001
file name : Image_25112022130006056.png
|
2022-11-25 13:00:06.15756 |
198 |
48283898 |
PCC ROAD FROM MUNNAR BATTALA TO SUVAN POND AT SANKARPUR |
250000 |
PCC ROAD FROM MUNNAR BATTALA TO SUVAN POND AT SANKARPUR1 |
Roof laid |
-
latitude : 24.0992517,24.099399391561747
Longitude : 88.4416034,88.44089644029737
file name : Image_03052023122533720.png
|
2023-05-03 12:25:33.896919 |
199 |
48283898 |
PCC ROAD FROM MUNNAR BATTALA TO SUVAN POND AT SANKARPUR |
250000 |
PCC ROAD FROM MUNNAR BATTALA TO SUVAN POND AT SANKARPUR1 |
Plinth level |
-
latitude : 24.0992791,24.0992783
Longitude : 88.4415853,88.4415827
file name : Image_19112022094011569.png
|
2022-11-19 09:40:11.669337 |
200 |
48283898 |
PCC ROAD FROM MUNNAR BATTALA TO SUVAN POND AT SANKARPUR |
250000 |
PCC ROAD FROM MUNNAR BATTALA TO SUVAN POND AT SANKARPUR1 |
Completion of work |
-
latitude : 24.099440588615835,24.09944750368595
Longitude : 88.44095075502992,88.44095620326698
file name : Image_29102022165821755.png
|
2022-10-29 16:58:21.868517 |
201 |
48284884 |
PCC ROAD FROM AJABUL HOUSE TO GOLAM HOUSE AT WEST TARTIPUR |
150000 |
PCC ROAD FROM AJABUL HOUSE TO GOLAM HOUSE AT WEST TARTIPUR1 |
Roof laid |
-
latitude : 24.0888909,24.0888936
Longitude : 88.4593732,88.4593712
file name : Image_09042023141028182.png
|
2023-04-09 14:10:28.277429 |
202 |
48284884 |
PCC ROAD FROM AJABUL HOUSE TO GOLAM HOUSE AT WEST TARTIPUR |
150000 |
PCC ROAD FROM AJABUL HOUSE TO GOLAM HOUSE AT WEST TARTIPUR1 |
Plinth level |
-
latitude : 24.0888933,24.0888932
Longitude : 88.459371,88.4593718
file name : Image_22112022132046114.png
|
2022-11-22 13:20:46.603391 |
203 |
48284884 |
PCC ROAD FROM AJABUL HOUSE TO GOLAM HOUSE AT WEST TARTIPUR |
150000 |
PCC ROAD FROM AJABUL HOUSE TO GOLAM HOUSE AT WEST TARTIPUR1 |
Completion of work |
-
latitude : 24.0888927,24.0888933
Longitude : 88.4593713,88.459371
file name : Image_13112022143007644.png
|
2022-11-13 14:30:07.740307 |
204 |
48284156 |
PCC ROAD FROM HAPIJUL HOUSE TO SAIFUL HOUSE AT TEKONA |
150000 |
PCC ROAD FROM HAPIJUL HOUSE TO SAIFUL HOUSE AT TEKONA1 |
Plinth level |
-
latitude : 24.11142918281257,24.11148626357317
Longitude : 88.47437795251608,88.4744081273675
file name : Image_22112022125656585.png
|
2022-11-22 12:56:57.077108 |
205 |
48284156 |
PCC ROAD FROM HAPIJUL HOUSE TO SAIFUL HOUSE AT TEKONA |
150000 |
PCC ROAD FROM HAPIJUL HOUSE TO SAIFUL HOUSE AT TEKONA1 |
Completion of work |
-
latitude : 24.111434421502054,24.111428512260318
Longitude : 88.47440108656883,88.47433403134346
file name : Image_13112022140917345.png
|
2022-11-13 14:09:17.422476 |
206 |
48286051 |
PCC ROAD FROM NUR SK HOUSE TO SADEK SK HOUSE AT SOUTH TARTIPUR |
150000 |
PCC ROAD FROM NUR SK HOUSE TO SADEK SK HOUSE AT SOUTH TARTIPUR1 |
Roof laid |
-
latitude : 24.084423277527094,24.084444819018245
Longitude : 88.46773982048035,88.46776119433343
file name : Image_01032023130813120.png
|
2023-03-01 13:08:13.213192 |
207 |
48286051 |
PCC ROAD FROM NUR SK HOUSE TO SADEK SK HOUSE AT SOUTH TARTIPUR |
150000 |
PCC ROAD FROM NUR SK HOUSE TO SADEK SK HOUSE AT SOUTH TARTIPUR1 |
Plinth level |
-
latitude : 24.08395548351109,24.083995088003576
Longitude : 88.4676799736917,88.4676937200129
file name : Image_21112022165124203.png
|
2022-11-21 16:01:32.020553 |
208 |
48286051 |
PCC ROAD FROM NUR SK HOUSE TO SADEK SK HOUSE AT SOUTH TARTIPUR |
150000 |
PCC ROAD FROM NUR SK HOUSE TO SADEK SK HOUSE AT SOUTH TARTIPUR1 |
Completion of work |
-
latitude : 24.09761320799589,24.084432958625257
Longitude : 88.43946942128241,88.46773453988135
file name : Image_19112022143801779.png
|
2022-11-19 14:38:01.887893 |
209 |
48101141 |
INSTALATION OF SOLAR LIGHT AT RAMKRISHNAPUR GRAVEYARD |
74160 |
INSTALATION OF SOLAR LIGHT AT RAMKRISHNAPUR GRAVEYARD 1 |
Roof laid |
-
latitude : 24.105644412338734
Longitude : 88.4633454401046
file name : Image_06042023132138597.png
|
2023-04-06 13:21:38.690726 |
210 |
48101141 |
INSTALATION OF SOLAR LIGHT AT RAMKRISHNAPUR GRAVEYARD |
74160 |
INSTALATION OF SOLAR LIGHT AT RAMKRISHNAPUR GRAVEYARD 1 |
Roof laid |
-
latitude : 24.094742238521576
Longitude : 88.43528794124722
file name : Image_03022023161729147.png
|
2023-02-03 16:17:29.242921 |
211 |
48101141 |
INSTALATION OF SOLAR LIGHT AT RAMKRISHNAPUR GRAVEYARD |
74160 |
INSTALATION OF SOLAR LIGHT AT RAMKRISHNAPUR GRAVEYARD 1 |
Plinth level |
-
latitude : 24.107917500659823
Longitude : 88.46561131998897
file name : Image_19072022142251792.png
|
2022-07-19 14:22:51.881389 |
212 |
48101141 |
INSTALATION OF SOLAR LIGHT AT RAMKRISHNAPUR GRAVEYARD |
74160 |
INSTALATION OF SOLAR LIGHT AT RAMKRISHNAPUR GRAVEYARD 1 |
Completion of work |
-
latitude : 24.10563544370234
Longitude : 88.46323077566922
file name : Image_19072022131559687.png
|
2022-07-19 13:15:59.792169 |
213 |
65657670 |
Construction of Community Sanitary Complex |
915000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.078492703847587
Longitude : 88.47864819690585
file name : Image_07122022121413894.png
|
2022-12-07 12:14:13.98111 |
214 |
65657670 |
Construction of Community Sanitary Complex |
915000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.078514790162444
Longitude : 88.47864484414458
file name : Image_19122022121438774.png
|
2022-12-19 12:14:38.895433 |
215 |
61251858 |
CONSTRUCTION OF RECORD ROOM AT 1st FLOOR |
100000 |
CONSTRUCTION OF RECORD ROOM AT 1st FLOOR1 |
Roof laid |
-
latitude : 24.0845892
Longitude : 88.4752706
file name : Image_17042023145012706.png
|
2023-04-17 14:50:12.824293 |
216 |
61251858 |
CONSTRUCTION OF RECORD ROOM AT 1st FLOOR |
100000 |
CONSTRUCTION OF RECORD ROOM AT 1st FLOOR1 |
Plinth level |
-
latitude : 24.0846154
Longitude : 88.4752031
file name : Image_17032023152231358.png
|
2023-03-17 15:22:31.44212 |
217 |
61251858 |
CONSTRUCTION OF RECORD ROOM AT 1st FLOOR |
100000 |
CONSTRUCTION OF RECORD ROOM AT 1st FLOOR1 |
Completion of work |
-
latitude : 24.0847364
Longitude : 88.4750689
file name : Image_20012023160858173.png
|
2023-01-20 16:08:58.257254 |
218 |
56843411 |
CONSTRUCTION OF PCC ROAD FROM DILUYAR HOUSE TO PITCH ROAD AT KHAMARMATI |
125000 |
CONSTRUCTION OF PCC ROAD FROM DILUYAR HOUSE TO PITCH ROAD AT KHAMARMATI1 |
Roof laid |
-
latitude : 24.088038098998368,24.08799346536398
Longitude : 88.45650304108858,88.45651268027723
file name : Image_03052023125342389.png
|
2023-05-03 12:53:42.486604 |
219 |
56843411 |
CONSTRUCTION OF PCC ROAD FROM DILUYAR HOUSE TO PITCH ROAD AT KHAMARMATI |
125000 |
CONSTRUCTION OF PCC ROAD FROM DILUYAR HOUSE TO PITCH ROAD AT KHAMARMATI1 |
Roof laid |
-
latitude : 24.088020832277834,24.088003230281174
Longitude : 88.45650329254568,88.45651695504785
file name : Image_16042023170543497.png
|
2023-04-16 17:05:43.578183 |
220 |
56843411 |
CONSTRUCTION OF PCC ROAD FROM DILUYAR HOUSE TO PITCH ROAD AT KHAMARMATI |
125000 |
CONSTRUCTION OF PCC ROAD FROM DILUYAR HOUSE TO PITCH ROAD AT KHAMARMATI1 |
Plinth level |
-
latitude : 24.08798022195697,24.08794853836298
Longitude : 88.45651536248624,88.45647403970361
file name : Image_13042023112104711.png
|
2023-04-13 11:21:04.79759 |
221 |
56843411 |
CONSTRUCTION OF PCC ROAD FROM DILUYAR HOUSE TO PITCH ROAD AT KHAMARMATI |
125000 |
CONSTRUCTION OF PCC ROAD FROM DILUYAR HOUSE TO PITCH ROAD AT KHAMARMATI1 |
Completion of work |
-
latitude : 24.088105405680835,24.088057754561305
Longitude : 88.45649507828057,88.45649826340377
file name : Image_08042023162927906.png
|
2023-04-08 16:29:28.005708 |
222 |
56835903 |
CONSTRUCTIO OF PCC ROAD FROM KHALIL BISWAS TO JAYNAL HOUSE AT SOUTH TARTIPUR |
160000 |
CONSTRUCTIO OF PCC ROAD FROM KHALIL BISWAS TO JAYNAL HOUSE AT SOUTH TARTIPUR1 |
Roof laid |
-
latitude : 24.081268333333334,24.081270000000004
Longitude : 88.47484333333333,88.47486166666667
file name : Image_31072023135750733.png
|
2023-07-31 13:57:50.85461 |
223 |
56835903 |
CONSTRUCTIO OF PCC ROAD FROM KHALIL BISWAS TO JAYNAL HOUSE AT SOUTH TARTIPUR |
160000 |
CONSTRUCTIO OF PCC ROAD FROM KHALIL BISWAS TO JAYNAL HOUSE AT SOUTH TARTIPUR1 |
Plinth level |
-
latitude : 24.081176463514566,24.08121942076832
Longitude : 88.47460174933076,88.47487810067832
file name : Image_17042023120525516.png
|
2023-04-17 12:05:25.603883 |
224 |
56835903 |
CONSTRUCTIO OF PCC ROAD FROM KHALIL BISWAS TO JAYNAL HOUSE AT SOUTH TARTIPUR |
160000 |
CONSTRUCTIO OF PCC ROAD FROM KHALIL BISWAS TO JAYNAL HOUSE AT SOUTH TARTIPUR1 |
Completion of work |
-
latitude : 24.08132951706648,24.08133324701339
Longitude : 88.47484859637916,88.47479964606464
file name : Image_06042023133502271.png
|
2023-04-06 13:35:02.367463 |
225 |
48297443 |
CONSTRUCTION OF COVER VDRAIN FROM RASID MONDAL HOUSE TO SIDDIK MONDAL HOUSE AT PATHARGHATA |
123307 |
CONSTRUCTION OF COVER VDRAIN FROM RASID MONDAL HOUSE TO SIDDIK MONDAL HOUSE AT PATHARGHATA1 |
Roof laid |
-
latitude : 24.095233166590333,24.095226754434407
Longitude : 88.43614297918975,88.43616359867156
file name : Image_03072022170805706.png
|
2022-07-03 17:08:05.797007 |
226 |
48297443 |
CONSTRUCTION OF COVER VDRAIN FROM RASID MONDAL HOUSE TO SIDDIK MONDAL HOUSE AT PATHARGHATA |
123307 |
CONSTRUCTION OF COVER VDRAIN FROM RASID MONDAL HOUSE TO SIDDIK MONDAL HOUSE AT PATHARGHATA1 |
Plinth level |
-
latitude : 24.09521661233157,24.09522298257798
Longitude : 88.43615538440645,88.43613719567657
file name : Image_25052022160453609.png
|
2022-05-25 16:04:53.731885 |
227 |
48297443 |
CONSTRUCTION OF COVER VDRAIN FROM RASID MONDAL HOUSE TO SIDDIK MONDAL HOUSE AT PATHARGHATA |
123307 |
CONSTRUCTION OF COVER VDRAIN FROM RASID MONDAL HOUSE TO SIDDIK MONDAL HOUSE AT PATHARGHATA1 |
Completion of work |
-
latitude : 24.095275243744254,24.09525776747614
Longitude : 88.43607751652598,88.43608941882849
file name : Image_22052022150317678.png
|
2022-05-22 15:03:17.773962 |
228 |
48294199 |
CONSTRUCTION OF COVER DRAIN FROM BAPON GHOSH HOUSE TO HEALTH CENTER AT SANKARPUR |
249942 |
CONSTRUCTION OF COVER DRAIN FROM BAPON GHOSH HOUSE TO HEALTH CENTER AT SANKARPUR1 |
Roof laid |
-
latitude : 24.097277764230967,24.097321517765522
Longitude : 88.43751375563443,88.43746514059603
file name : Image_16052022133856341.png
|
2022-05-16 13:38:56.442636 |
229 |
48294199 |
CONSTRUCTION OF COVER DRAIN FROM BAPON GHOSH HOUSE TO HEALTH CENTER AT SANKARPUR |
249942 |
CONSTRUCTION OF COVER DRAIN FROM BAPON GHOSH HOUSE TO HEALTH CENTER AT SANKARPUR1 |
Plinth level |
-
latitude : 24.09724415279925,24.097250271588564
Longitude : 88.43748718500137,88.43746396712959
file name : Image_27042022123129037.png
|
2022-04-27 12:31:29.162569 |
230 |
48294199 |
CONSTRUCTION OF COVER DRAIN FROM BAPON GHOSH HOUSE TO HEALTH CENTER AT SANKARPUR |
249942 |
CONSTRUCTION OF COVER DRAIN FROM BAPON GHOSH HOUSE TO HEALTH CENTER AT SANKARPUR1 |
Completion of work |
-
latitude : 24.097252367064357,24.097252367064357
Longitude : 88.43754929490387,88.43754929490387
file name : Image_19042022130007052.png
|
2022-04-19 13:00:07.155052 |
231 |
48296141 |
CONSTRUCTION OF COVER DRAIN FROM MAINUL SK SHOP TO JOHID SK HOUSE AT EAST TARTIPUR |
191754 |
CONSTRUCTION OF COVER DRAIN FROM MAINUL SK SHOP TO JOHID SK HOUSE AT EAST TARTIPUR1 |
Roof laid |
-
latitude : 24.08667901530862,24.086649930104613
Longitude : 88.47472588531673,88.47470736131072
file name : Image_07052022101328094.png
|
2022-05-07 10:13:28.180168 |
232 |
48296141 |
CONSTRUCTION OF COVER DRAIN FROM MAINUL SK SHOP TO JOHID SK HOUSE AT EAST TARTIPUR |
191754 |
CONSTRUCTION OF COVER DRAIN FROM MAINUL SK SHOP TO JOHID SK HOUSE AT EAST TARTIPUR1 |
Plinth level |
-
latitude : 24.086913163773715,24.08690662588924
Longitude : 88.47477500326931,88.47476963885128
file name : Image_30032022171029743.png
|
2022-03-30 17:10:29.803456 |
233 |
48296141 |
CONSTRUCTION OF COVER DRAIN FROM MAINUL SK SHOP TO JOHID SK HOUSE AT EAST TARTIPUR |
191754 |
CONSTRUCTION OF COVER DRAIN FROM MAINUL SK SHOP TO JOHID SK HOUSE AT EAST TARTIPUR1 |
Completion of work |
-
latitude : 24.086618749424815,24.086608942598104
Longitude : 88.47467727027833,88.47468380816281
file name : Image_29032022164836856.png
|
2022-03-29 16:48:36.935947 |
234 |
48286528 |
PCC ROAD FROM ABUL HOSEN HOUSE TO RAFIK HOUSE ST SIDDHINANDI |
149973 |
PCC ROAD FROM ABUL HOSEN HOUSE TO RAFIK HOUSE ST SIDDHINANDI1 |
Roof laid |
-
latitude : 24.073965973220766,24.073952604085207
Longitude : 88.48007814958692,88.48008384928107
file name : Image_01032023124338281.png
|
2023-03-01 12:43:38.376732 |
235 |
48286528 |
PCC ROAD FROM ABUL HOSEN HOUSE TO RAFIK HOUSE ST SIDDHINANDI |
149973 |
PCC ROAD FROM ABUL HOSEN HOUSE TO RAFIK HOUSE ST SIDDHINANDI1 |
Plinth level |
-
latitude : 24.07393860630691,24.073934499174356
Longitude : 88.48002039827406,88.4800392575562
file name : Image_03062022110655058.png
|
2022-06-03 11:06:55.142189 |
236 |
48286528 |
PCC ROAD FROM ABUL HOSEN HOUSE TO RAFIK HOUSE ST SIDDHINANDI |
149973 |
PCC ROAD FROM ABUL HOSEN HOUSE TO RAFIK HOUSE ST SIDDHINANDI1 |
Completion of work |
-
latitude : 24.07395562157035,24.07385738566518
Longitude : 88.48002618178725,88.48015048541129
file name : Image_29052022105602726.png
|
2022-05-29 10:56:02.857173 |
237 |
48285371 |
PCC ROAD FROM MAIDUL HOUSE TO MUSAHAK HOUSE AT KHOJARPARA |
150000 |
PCC ROAD FROM MAIDUL HOUSE TO MUSAHAK HOUSE AT KHOJARPARA1 |
Roof laid |
-
latitude : 24.086262644268572,24.086270313709974
Longitude : 88.47513031214476,88.47511899657547
file name : Image_01032023131439404.png
|
2023-03-01 13:14:39.516454 |
238 |
48285371 |
PCC ROAD FROM MAIDUL HOUSE TO MUSAHAK HOUSE AT KHOJARPARA |
150000 |
PCC ROAD FROM MAIDUL HOUSE TO MUSAHAK HOUSE AT KHOJARPARA1 |
Plinth level |
-
latitude : 24.08650752156973,24.08649373333901
Longitude : 88.47519376315176,88.47524489276111
file name : Image_01122022123256174.png
|
2022-12-01 12:32:56.264327 |
239 |
48285371 |
PCC ROAD FROM MAIDUL HOUSE TO MUSAHAK HOUSE AT KHOJARPARA |
150000 |
PCC ROAD FROM MAIDUL HOUSE TO MUSAHAK HOUSE AT KHOJARPARA1 |
Completion of work |
-
latitude : 24.086247053928673,24.086286071687937
Longitude : 88.47516199573874,88.47517129965127
file name : Image_13112022144110684.png
|
2022-11-13 14:41:10.771165 |
240 |
48284400 |
PCC ROAD FROM MAHAMOD HOUSE TO ICDS AT DHARAMPUR |
200000 |
PCC ROAD FROM MAHAMOD HOUSE TO ICDS AT DHARAMPUR1 |
Roof laid |
-
latitude : 24.084861525334418,24.084778418764472
Longitude : 88.43911478295922,88.43910011462867
file name : Image_08042023165135017.png
|
2023-04-08 16:51:35.114683 |
241 |
48284400 |
PCC ROAD FROM MAHAMOD HOUSE TO ICDS AT DHARAMPUR |
200000 |
PCC ROAD FROM MAHAMOD HOUSE TO ICDS AT DHARAMPUR1 |
Plinth level |
-
latitude : 24.018732206895947,24.08473948482424
Longitude : 88.4500484727323,88.43911821953952
file name : Image_22112022123747481.png
|
2022-11-22 12:37:47.972836 |
242 |
48284400 |
PCC ROAD FROM MAHAMOD HOUSE TO ICDS AT DHARAMPUR |
200000 |
PCC ROAD FROM MAHAMOD HOUSE TO ICDS AT DHARAMPUR1 |
Completion of work |
-
latitude : 24.08480130136013,24.08478319644928
Longitude : 88.43916934914887,88.4392056427896
file name : Image_12112022161300955.png
|
2022-11-12 16:13:01.027052 |
243 |
48286634 |
PCC ROAD FROM SOYEB HOUSE TO JAJBIR HOUSE AT SIDDHINANDI |
150000 |
PCC ROAD FROM SOYEB HOUSE TO JAJBIR HOUSE AT SIDDHINANDI1 |
Roof laid |
-
latitude : 24.076869967393577,24.07685546670109
Longitude : 88.48042842932045,88.48046002909541
file name : Image_01032023124832551.png
|
2023-03-01 12:48:32.638783 |
244 |
48286634 |
PCC ROAD FROM SOYEB HOUSE TO JAJBIR HOUSE AT SIDDHINANDI |
150000 |
PCC ROAD FROM SOYEB HOUSE TO JAJBIR HOUSE AT SIDDHINANDI1 |
Plinth level |
-
latitude : 24.076836984604597,24.076837277971208
Longitude : 88.48042163997889,88.48042909987271
file name : Image_27112022151421150.png
|
2022-11-27 15:14:21.265707 |
245 |
48286634 |
PCC ROAD FROM SOYEB HOUSE TO JAJBIR HOUSE AT SIDDHINANDI |
150000 |
PCC ROAD FROM SOYEB HOUSE TO JAJBIR HOUSE AT SIDDHINANDI1 |
Completion of work |
-
latitude : 24.076840840280056,24.076845911331475
Longitude : 88.48041518591344,88.48037285730243
file name : Image_09112022154534156.png
|
2022-11-09 15:45:34.274686 |
246 |
48125923 |
INSTALLATION OF SOLAR LIGHT NEARVSHANTI SEVA CLUB AT SUNDALPUR |
80000 |
INSTALLATION OF SOLAR LIGHT NEARVSHANTI SEVA CLUB AT SUNDALPUR1 |
Roof laid |
-
latitude : 24.0717418
Longitude : 88.4923809
file name : Image_01032023123319576.png
|
2023-03-01 12:33:19.672488 |
247 |
48125923 |
INSTALLATION OF SOLAR LIGHT NEARVSHANTI SEVA CLUB AT SUNDALPUR |
80000 |
INSTALLATION OF SOLAR LIGHT NEARVSHANTI SEVA CLUB AT SUNDALPUR1 |
Plinth level |
-
latitude : 24.0717155
Longitude : 88.4923052
file name : Image_04122022121202293.png
|
2022-12-04 12:12:02.370714 |
248 |
48125923 |
INSTALLATION OF SOLAR LIGHT NEARVSHANTI SEVA CLUB AT SUNDALPUR |
80000 |
INSTALLATION OF SOLAR LIGHT NEARVSHANTI SEVA CLUB AT SUNDALPUR1 |
Completion of work |
-
latitude : 24.0717168
Longitude : 88.4923073
file name : Image_27112022145237681.png
|
2022-11-27 14:52:37.793255 |
249 |
48294507 |
CONSTRUCTION OF COVER DRAIN IN FRONT OF ABUL SK POULTRY FARM AT RAMKRISHNAPUR |
140675 |
CONSTRUCTION OF COVER DRAIN IN FRONT OF ABUL SK POULTRY FARM AT RAMKRISHNAPUR1 |
Roof laid |
-
latitude : 24.100182722322643,24.100221781991422
Longitude : 88.46189587377012,88.46190408803523
file name : Image_07052022104114242.png
|
2022-05-07 10:41:14.377294 |
250 |
48294507 |
CONSTRUCTION OF COVER DRAIN IN FRONT OF ABUL SK POULTRY FARM AT RAMKRISHNAPUR |
140675 |
CONSTRUCTION OF COVER DRAIN IN FRONT OF ABUL SK POULTRY FARM AT RAMKRISHNAPUR1 |
Plinth level |
-
latitude : 24.100268804468215,24.100223751738667
Longitude : 88.46184491179883,88.46177467145026
file name : Image_30032022123354657.png
|
2022-03-30 12:33:54.721508 |
251 |
48294507 |
CONSTRUCTION OF COVER DRAIN IN FRONT OF ABUL SK POULTRY FARM AT RAMKRISHNAPUR |
140675 |
CONSTRUCTION OF COVER DRAIN IN FRONT OF ABUL SK POULTRY FARM AT RAMKRISHNAPUR1 |
Completion of work |
-
latitude : 24.100171951577067,24.100295626558363
Longitude : 88.46188170835376,88.46189470030367
file name : Image_29032022161207713.png
|
2022-03-29 16:12:07.784216 |
252 |
48295024 |
CONSTRUCTION OF COMMUNITY TOILET AT KASEM HAJI LAND AT JAMLABAD |
2300000 |
CONSTRUCTION OF COMMUNITY TOILET AT KASEM HAJI LAND AT JAMLABAD1 |
Roof laid |
-
latitude : 24.088916019536555
Longitude : 88.44931731931865
file name : Image_08042023163525000.png
|
2023-04-08 16:35:25.092717 |
253 |
48295024 |
CONSTRUCTION OF COMMUNITY TOILET AT KASEM HAJI LAND AT JAMLABAD |
2300000 |
CONSTRUCTION OF COMMUNITY TOILET AT KASEM HAJI LAND AT JAMLABAD1 |
Plinth level |
-
latitude : 24.088836475275457
Longitude : 88.44934171065688
file name : Image_08062022150650769.png
|
2022-06-08 15:06:50.860409 |
254 |
48295024 |
CONSTRUCTION OF COMMUNITY TOILET AT KASEM HAJI LAND AT JAMLABAD |
2300000 |
CONSTRUCTION OF COMMUNITY TOILET AT KASEM HAJI LAND AT JAMLABAD1 |
Completion of work |
-
latitude : 24.088887311518192
Longitude : 88.44920122995973
file name : Image_16052022134805552.png
|
2022-05-16 13:48:05.66665 |
255 |
48293913 |
CONSTRUCTION OF COMMUNITY TOILETNEAR MASZID AT PATHARGHATA |
230000 |
CONSTRUCTION OF COMMUNITY TOILETNEAR MASZID AT PATHARGHATA1 |
Roof laid |
-
latitude : 24.09310630057007
Longitude : 88.4370662458241
file name : Image_03072022171048760.png
|
2022-07-03 17:10:48.895817 |
256 |
48293913 |
CONSTRUCTION OF COMMUNITY TOILETNEAR MASZID AT PATHARGHATA |
230000 |
CONSTRUCTION OF COMMUNITY TOILETNEAR MASZID AT PATHARGHATA1 |
Plinth level |
-
latitude : 24.09298237413168
Longitude : 88.43711796216667
file name : Image_25052022160859309.png
|
2022-05-25 16:08:59.418323 |
257 |
48293913 |
CONSTRUCTION OF COMMUNITY TOILETNEAR MASZID AT PATHARGHATA |
230000 |
CONSTRUCTION OF COMMUNITY TOILETNEAR MASZID AT PATHARGHATA1 |
Completion of work |
-
latitude : 24.09303903579712
Longitude : 88.43701846897602
file name : Image_22052022151244039.png
|
2022-05-22 15:12:44.15448 |
258 |
48296582 |
CONSTRUCTION OF COMMUNITY TOILET AT SOUTH TARTIPUR KHANKA SHARIF |
230000 |
CONSTRUCTION OF COMMUNITY TOILET AT SOUTH TARTIPUR KHANKA SHARIF1 |
Roof laid |
-
latitude : 24.0826829
Longitude : 88.4756576
file name : Image_14072022162652324.png
|
2022-07-14 16:26:52.427132 |
259 |
48296582 |
CONSTRUCTION OF COMMUNITY TOILET AT SOUTH TARTIPUR KHANKA SHARIF |
230000 |
CONSTRUCTION OF COMMUNITY TOILET AT SOUTH TARTIPUR KHANKA SHARIF1 |
Completion of work |
-
latitude : 24.081543423235416
Longitude : 88.475212873891
file name : Image_30042022164735319.png
|
2022-04-30 16:47:35.454176 |
260 |
56839572 |
INSTALLATION OF SOLAR LIGHT NEAR MASZID AT SUNDALPUR |
45772 |
INSTALLATION OF SOLAR LIGHT NEAR MASZID AT SUNDALPUR1 |
Roof laid |
-
latitude : 24.0717947
Longitude : 88.4923642
file name : Image_01082023134755658.png
|
2023-08-01 13:47:55.750399 |
261 |
56839572 |
INSTALLATION OF SOLAR LIGHT NEAR MASZID AT SUNDALPUR |
45772 |
INSTALLATION OF SOLAR LIGHT NEAR MASZID AT SUNDALPUR1 |
Plinth level |
-
latitude : 24.0718077
Longitude : 88.492337
file name : Image_25052023160722383.png
|
2023-05-25 16:07:22.55132 |
262 |
56839572 |
INSTALLATION OF SOLAR LIGHT NEAR MASZID AT SUNDALPUR |
45772 |
INSTALLATION OF SOLAR LIGHT NEAR MASZID AT SUNDALPUR1 |
Completion of work |
-
latitude : 24.07191378995776
Longitude : 88.49235914647579
file name : Image_17042023114501243.png
|
2023-04-17 11:45:01.363133 |
263 |
56844676 |
INSTALLATION OF ARSENIC PLANT AT MIDDLE TARTIPUR BUS STAND |
1483000 |
INSTALLATION OF ARSENIC PLANT AT MIDDLE TARTIPUR BUS STAND1 |
Plinth level |
-
latitude : 24.0808234
Longitude : 88.479034
file name : Image_16082023122454271.png
|
2023-08-16 12:24:54.39293 |
264 |
56844676 |
INSTALLATION OF ARSENIC PLANT AT MIDDLE TARTIPUR BUS STAND |
1483000 |
INSTALLATION OF ARSENIC PLANT AT MIDDLE TARTIPUR BUS STAND1 |
Completion of work |
-
latitude : 24.0808459
Longitude : 88.4790282
file name : Image_28052023165951331.png
|
2023-05-28 16:59:51.417044 |
265 |
56837956 |
INSTALLATION OF SOLAR LIGHT AT KOMORER DHAR AT SUNDALPUR |
45772 |
INSTALLATION OF SOLAR LIGHT AT KOMORER DHAR AT SUNDALPUR1 |
Roof laid |
-
latitude : 24.07304333333333
Longitude : 88.49307833333333
file name : Image_01082023135144733.png
|
2023-08-01 13:51:44.82051 |
266 |
56837956 |
INSTALLATION OF SOLAR LIGHT AT KOMORER DHAR AT SUNDALPUR |
45772 |
INSTALLATION OF SOLAR LIGHT AT KOMORER DHAR AT SUNDALPUR1 |
Plinth level |
-
latitude : 24.07302267383784
Longitude : 88.4930341411382
file name : Image_25052023154546600.png
|
2023-05-25 15:45:46.797911 |
267 |
56837956 |
INSTALLATION OF SOLAR LIGHT AT KOMORER DHAR AT SUNDALPUR |
45772 |
INSTALLATION OF SOLAR LIGHT AT KOMORER DHAR AT SUNDALPUR1 |
Completion of work |
-
latitude : 24.0728924
Longitude : 88.492645
file name : Image_17042023115253819.png
|
2023-04-17 11:52:53.904874 |
268 |
56855375 |
CONSTRUCTION OF COVER DRAIN FROM PITCH ROAD TO RAJU HOUSE AT SUNDALPUR |
200000 |
CONSTRUCTION OF COVER DRAIN FROM PITCH ROAD TO RAJU HOUSE AT SUNDALPUR1 |
Plinth level |
-
latitude : 24.073693333333335,24.073643333333333
Longitude : 88.49425500000001,88.49429
file name : Image_01082023135201932.png
|
2023-08-01 13:52:02.031886 |
269 |
56855375 |
CONSTRUCTION OF COVER DRAIN FROM PITCH ROAD TO RAJU HOUSE AT SUNDALPUR |
200000 |
CONSTRUCTION OF COVER DRAIN FROM PITCH ROAD TO RAJU HOUSE AT SUNDALPUR1 |
Plinth level |
-
latitude : 24.073693333333335,24.073643333333333
Longitude : 88.49425500000001,88.49429
file name : Image_01082023135215809.png
|
2023-08-01 13:52:15.895899 |
270 |
56855375 |
CONSTRUCTION OF COVER DRAIN FROM PITCH ROAD TO RAJU HOUSE AT SUNDALPUR |
200000 |
CONSTRUCTION OF COVER DRAIN FROM PITCH ROAD TO RAJU HOUSE AT SUNDALPUR1 |
Completion of work |
-
latitude : 24.073608736507595,24.073623698204756
Longitude : 88.49421674385667,88.49428673274815
file name : Image_19062023121657002.png
|
2023-06-19 12:16:57.100995 |
271 |
56854114 |
CONSTRUCTION OF COMMUNITY TOILET AT DARBAR SARIF AT SOUTH TARTIPUR |
200000 |
CONSTRUCTION OF COMMUNITY TOILET AT DARBAR SARIF AT SOUTH TARTIPUR1 |
Completion of work |
-
latitude : 24.08278833333333
Longitude : 88.46809833333333
file name : Image_31072023135258075.png
|
2023-07-31 13:52:58.154116 |
272 |
56842852 |
CONSTRUCTION OF PCC ROAD FROM KUYOTALA TO LUJMAN HOUSE AT KALIDIAR |
200115 |
CONSTRUCTION OF PCC ROAD FROM KUYOTALA TO LUJMAN HOUSE AT KALIDIAR1 |
Roof laid |
-
latitude : 24.093735,24.093666666666664
Longitude : 88.48857333333332,88.4886
file name : Image_01082023141022908.png
|
2023-08-01 14:10:23.001533 |
273 |
56842852 |
CONSTRUCTION OF PCC ROAD FROM KUYOTALA TO LUJMAN HOUSE AT KALIDIAR |
200115 |
CONSTRUCTION OF PCC ROAD FROM KUYOTALA TO LUJMAN HOUSE AT KALIDIAR1 |
Plinth level |
-
latitude : 24.093880620785058,24.093830999918282
Longitude : 88.48840632475913,88.48842996172607
file name : Image_31052023121452857.png
|
2023-05-31 12:14:52.956117 |
274 |
56842852 |
CONSTRUCTION OF PCC ROAD FROM KUYOTALA TO LUJMAN HOUSE AT KALIDIAR |
200115 |
CONSTRUCTION OF PCC ROAD FROM KUYOTALA TO LUJMAN HOUSE AT KALIDIAR1 |
Completion of work |
-
latitude : 24.09371637739241,24.09371113870293
Longitude : 88.4885029681027,88.48850606940687
file name : Image_28052023172351584.png
|
2023-05-28 17:23:51.683452 |
275 |
56854304 |
CONSTRUCTION OF COVER DRAIN FROM PROVAT PRAMANIK TO PITCH ROAD AT EAST TARTIPUR |
200000 |
CONSTRUCTION OF COVER DRAIN FROM PROVAT PRAMANIK TO PITCH ROAD AT EAST TARTIPUR1 |
Roof laid |
-
latitude : 24.08570333333333,24.086131666666667
Longitude : 88.47458999999999,88.47458666666668
file name : Image_01082023140433420.png
|
2023-08-01 14:04:33.506628 |
276 |
56854304 |
CONSTRUCTION OF COVER DRAIN FROM PROVAT PRAMANIK TO PITCH ROAD AT EAST TARTIPUR |
200000 |
CONSTRUCTION OF COVER DRAIN FROM PROVAT PRAMANIK TO PITCH ROAD AT EAST TARTIPUR1 |
Plinth level |
-
latitude : 24.08609835896641,24.08609835896641
Longitude : 88.47451935522258,88.47451935522258
file name : Image_14062023122125312.png
|
2023-06-14 12:21:25.404055 |
277 |
56854304 |
CONSTRUCTION OF COVER DRAIN FROM PROVAT PRAMANIK TO PITCH ROAD AT EAST TARTIPUR |
200000 |
CONSTRUCTION OF COVER DRAIN FROM PROVAT PRAMANIK TO PITCH ROAD AT EAST TARTIPUR1 |
Completion of work |
-
latitude : 24.0860851155594,24.086137334816158
Longitude : 88.47463812679052,88.47475094720721
file name : Image_28052023171655904.png
|
2023-05-28 17:16:56.012486 |
278 |
56855878 |
CONSTRUCTION OF COMMUNITY TOILET AT DHARAMPUR KHANPARA MASZID |
200000 |
CONSTRUCTION OF COMMUNITY TOILET AT DHARAMPUR KHANPARA MASZID1 |
Roof laid |
-
latitude : 24.084380000000003
Longitude : 88.438975
file name : Image_28082023130653428.png
|
2023-08-28 13:06:53.537537 |
279 |
56855878 |
CONSTRUCTION OF COMMUNITY TOILET AT DHARAMPUR KHANPARA MASZID |
200000 |
CONSTRUCTION OF COMMUNITY TOILET AT DHARAMPUR KHANPARA MASZID1 |
Plinth level |
-
latitude : 24.084395000000004
Longitude : 88.43894833333334
file name : Image_01082023154157927.png
|
2023-08-01 15:41:58.271584 |
280 |
56855878 |
CONSTRUCTION OF COMMUNITY TOILET AT DHARAMPUR KHANPARA MASZID |
200000 |
CONSTRUCTION OF COMMUNITY TOILET AT DHARAMPUR KHANPARA MASZID1 |
Completion of work |
-
latitude : 24.08437738660723
Longitude : 88.4390364959836
file name : Image_06052023160208515.png
|
2023-05-06 16:02:08.614224 |
281 |
56856403 |
CONSTRUCTION OF COMMUNITY TOILET AT SANKARPUR GRAVEYARD |
200000 |
CONSTRUCTION OF COMMUNITY TOILET AT SANKARPUR GRAVEYARD1 |
Roof laid |
-
latitude : 24.103520000000003
Longitude : 88.43701833333334
file name : Image_02082023091621735.png
|
2023-08-02 09:16:21.830618 |
282 |
56856403 |
CONSTRUCTION OF COMMUNITY TOILET AT SANKARPUR GRAVEYARD |
200000 |
CONSTRUCTION OF COMMUNITY TOILET AT SANKARPUR GRAVEYARD1 |
Plinth level |
-
latitude : 24.103487329557538
Longitude : 88.43703640624881
file name : Image_24052023122434661.png
|
2023-05-24 12:24:34.778021 |
283 |
56856403 |
CONSTRUCTION OF COMMUNITY TOILET AT SANKARPUR GRAVEYARD |
200000 |
CONSTRUCTION OF COMMUNITY TOILET AT SANKARPUR GRAVEYARD1 |
Completion of work |
-
latitude : 24.103500824421644
Longitude : 88.43711737543344
file name : Image_06052023124055445.png
|
2023-05-06 12:40:55.561601 |
284 |
56856242 |
CONSTRUCTION OF COMMUNITY TOILET NEAR MANDIR AT SANKARPUR |
200000 |
CONSTRUCTION OF COMMUNITY TOILET NEAR MANDIR AT SANKARPUR1 |
Roof laid |
-
latitude : 24.09832333333333
Longitude : 88.43740666666666
file name : Image_02082023090456466.png
|
2023-08-02 09:04:56.571321 |
285 |
56856242 |
CONSTRUCTION OF COMMUNITY TOILET NEAR MANDIR AT SANKARPUR |
200000 |
CONSTRUCTION OF COMMUNITY TOILET NEAR MANDIR AT SANKARPUR1 |
Plinth level |
-
latitude : 24.09830232616514
Longitude : 88.43739716336131
file name : Image_06052023123543158.png
|
2023-05-06 12:35:43.344871 |
286 |
56856242 |
CONSTRUCTION OF COMMUNITY TOILET NEAR MANDIR AT SANKARPUR |
200000 |
CONSTRUCTION OF COMMUNITY TOILET NEAR MANDIR AT SANKARPUR1 |
Completion of work |
-
latitude : 24.09831850323826
Longitude : 88.43746463768184
file name : Image_03052023122121465.png
|
2023-05-03 12:21:21.579815 |
287 |
56856024 |
CONSTRUCTION OF COVER DRAIN FROM HAPIJUL HOUSE TO RIVER AT HAMDIRPARA |
200000 |
CONSTRUCTION OF COVER DRAIN FROM HAPIJUL HOUSE TO RIVER AT HAMDIRPARA1 |
Roof laid |
-
latitude : 24.10685622598976,24.106754176318645
Longitude : 88.43868688680232,88.43864782713354
file name : Image_06052023125902290.png
|
2023-05-06 12:59:02.382762 |
288 |
56856024 |
CONSTRUCTION OF COVER DRAIN FROM HAPIJUL HOUSE TO RIVER AT HAMDIRPARA |
200000 |
CONSTRUCTION OF COVER DRAIN FROM HAPIJUL HOUSE TO RIVER AT HAMDIRPARA1 |
Plinth level |
-
latitude : 24.10676180385053,24.106800234876573
Longitude : 88.43868940137327,88.43862494453788
file name : Image_06052023124547113.png
|
2023-05-06 12:45:47.221355 |
289 |
56856024 |
CONSTRUCTION OF COVER DRAIN FROM HAPIJUL HOUSE TO RIVER AT HAMDIRPARA |
200000 |
CONSTRUCTION OF COVER DRAIN FROM HAPIJUL HOUSE TO RIVER AT HAMDIRPARA1 |
Completion of work |
-
latitude : 24.106885981746018,24.10689679440111
Longitude : 88.43879073858261,88.43869526870549
file name : Image_03052023120125488.png
|
2023-05-03 12:01:25.607225 |
290 |
56844795 |
INSTALLATION OF ARSENIC PLANT AT RAMKRISHNAPUR SUB CENTRE |
1483000 |
INSTALLATION OF ARSENIC PLANT AT RAMKRISHNAPUR SUB CENTRE1 |
Roof laid |
-
latitude : 24.099778333333333
Longitude : 88.46127499999999
file name : Image_31072023161050738.png
|
2023-07-31 16:10:50.854547 |
291 |
56844795 |
INSTALLATION OF ARSENIC PLANT AT RAMKRISHNAPUR SUB CENTRE |
1483000 |
INSTALLATION OF ARSENIC PLANT AT RAMKRISHNAPUR SUB CENTRE1 |
Plinth level |
-
latitude : 24.100035661831498
Longitude : 88.46157861873507
file name : Image_06052023131610471.png
|
2023-05-06 13:16:10.643927 |
292 |
56844795 |
INSTALLATION OF ARSENIC PLANT AT RAMKRISHNAPUR SUB CENTRE |
1483000 |
INSTALLATION OF ARSENIC PLANT AT RAMKRISHNAPUR SUB CENTRE1 |
Completion of work |
-
latitude : 24.100089138373733
Longitude : 88.46162446774542
file name : Image_16042023165637438.png
|
2023-04-16 16:56:37.524415 |
293 |
56843026 |
CONSTRUCTION OF PCC ROAD FROM ASRAF MONDAL TO SSK AT REJLAPARA |
200000 |
CONSTRUCTION OF PCC ROAD FROM ASRAF MONDAL TO SSK AT REJLAPARA1 |
Roof laid |
-
latitude : 24.079652591608465,24.07971516251564
Longitude : 88.47821158356965,88.47817906178534
file name : Image_03052023134412280.png
|
2023-05-03 13:44:12.38533 |
294 |
56843026 |
CONSTRUCTION OF PCC ROAD FROM ASRAF MONDAL TO SSK AT REJLAPARA |
200000 |
CONSTRUCTION OF PCC ROAD FROM ASRAF MONDAL TO SSK AT REJLAPARA1 |
Plinth level |
-
latitude : 24.07963360659778,24.07962664961815
Longitude : 88.47791595384479,88.47793204709888
file name : Image_16042023173030666.png
|
2023-04-16 17:30:30.743728 |
295 |
56843026 |
CONSTRUCTION OF PCC ROAD FROM ASRAF MONDAL TO SSK AT REJLAPARA |
200000 |
CONSTRUCTION OF PCC ROAD FROM ASRAF MONDAL TO SSK AT REJLAPARA1 |
Completion of work |
-
latitude : 24.079650538042188,24.079647939652205
Longitude : 88.47790748812258,88.47789214923978
file name : Image_12042023105445960.png
|
2023-04-12 10:54:46.083918 |
296 |
77942834 |
Repairing of road with Sal Ballah piling near Rajesh Shop culvert at Siddhinandi |
100000 |
Repairing of road with Sal Ballah piling near Rajesh Shop culvert at Siddhinandi1 |
Plinth level |
-
latitude : 24.0764332,24.0764327
Longitude : 88.4818272,88.4818266
file name : Image_01082023135632649.png
|
2023-08-01 13:56:32.778105 |
297 |
77942834 |
Repairing of road with Sal Ballah piling near Rajesh Shop culvert at Siddhinandi |
100000 |
Repairing of road with Sal Ballah piling near Rajesh Shop culvert at Siddhinandi1 |
Completion of work |
-
latitude : 24.076432,24.0764327
Longitude : 88.4818227,88.4818266
file name : Image_31072023143507735.png
|
2023-07-31 14:35:07.836346 |
298 |
56840829 |
CONSTRUCTION OF PCC ROAD FROM SATTAR HOUSE TO ASABUDDIN HOUSE AT HAMDIRPARA |
217959 |
CONSTRUCTION OF PCC ROAD FROM SATTAR HOUSE TO ASABUDDIN HOUSE AT HAMDIRPARA1 |
Plinth level |
-
latitude : 24.106498333333334,24.106501666666666
Longitude : 88.44169500000001,88.44167
file name : Image_08012024114207017.png
|
2024-01-08 11:42:07.129651 |
299 |
56840829 |
CONSTRUCTION OF PCC ROAD FROM SATTAR HOUSE TO ASABUDDIN HOUSE AT HAMDIRPARA |
217959 |
CONSTRUCTION OF PCC ROAD FROM SATTAR HOUSE TO ASABUDDIN HOUSE AT HAMDIRPARA1 |
Completion of work |
-
latitude : 24.10644333333333,24.10644333333333,24.106438333333337
Longitude : 88.44171166666665,88.44171166666665,88.44172333333333
file name : Image_24112023102123481.png
|
2023-11-24 10:21:23.579363 |
300 |
56841862 |
CONSTRUCTION OF PCC ROAD FROM BUTTU HOUSE TO ASRAF HOUSE AT SANKARPUR |
250000 |
CONSTRUCTION OF PCC ROAD FROM BUTTU HOUSE TO ASRAF HOUSE AT SANKARPUR1 |
Plinth level |
-
latitude : 24.102185000000002,24.102179999999997
Longitude : 88.44081166666668,88.44084166666669
file name : Image_01122023093943472.png
|
2023-12-01 09:39:43.56322 |
301 |
56841862 |
CONSTRUCTION OF PCC ROAD FROM BUTTU HOUSE TO ASRAF HOUSE AT SANKARPUR |
250000 |
CONSTRUCTION OF PCC ROAD FROM BUTTU HOUSE TO ASRAF HOUSE AT SANKARPUR1 |
Completion of work |
-
latitude : 24.102195,24.102203333333332
Longitude : 88.44069833333333,88.44076333333332
file name : Image_22112023084449896.png
|
2023-11-22 08:44:49.989738 |
302 |
56840000 |
CONSTRUCTION OF PC ROAD FROM ABDUL SK HOUSE TO MUNSUR SK HOUSE AT RAMKRISHNAPUR |
111927 |
CONSTRUCTION OF PC ROAD FROM ABDUL SK HOUSE TO MUNSUR SK HOUSE AT RAMKRISHNAPUR1 |
Roof laid |
-
latitude : 24.0998218,24.099921666666667
Longitude : 88.4648881,88.46534000000001
file name : Image_30122023092420896.png
|
2023-12-30 09:24:20.969825 |
303 |
56840000 |
CONSTRUCTION OF PC ROAD FROM ABDUL SK HOUSE TO MUNSUR SK HOUSE AT RAMKRISHNAPUR |
111927 |
CONSTRUCTION OF PC ROAD FROM ABDUL SK HOUSE TO MUNSUR SK HOUSE AT RAMKRISHNAPUR1 |
Plinth level |
-
latitude : 24.099945,24.0998137
Longitude : 88.46532166666665,88.464878
file name : Image_06122023111307006.png
|
2023-12-06 11:13:07.107747 |
304 |
56840000 |
CONSTRUCTION OF PC ROAD FROM ABDUL SK HOUSE TO MUNSUR SK HOUSE AT RAMKRISHNAPUR |
111927 |
CONSTRUCTION OF PC ROAD FROM ABDUL SK HOUSE TO MUNSUR SK HOUSE AT RAMKRISHNAPUR1 |
Completion of work |
-
latitude : 24.0998153,24.0998156
Longitude : 88.4648793,88.4648826
file name : Image_01122023084209337.png
|
2023-12-01 08:42:09.427357 |
305 |
77941091 |
Construction of pcc road from pitch road to Kinder Garden School at East Tartipur |
143200 |
Construction of pcc road from pitch road to Kinder Garden School at East Tartipur1 |
Plinth level |
-
latitude : 24.087535000000003,24.08753
Longitude : 88.47143666666668,88.47142666666666
file name : Image_06122023114117016.png
|
2023-12-06 11:41:17.111687 |
306 |
77941091 |
Construction of pcc road from pitch road to Kinder Garden School at East Tartipur |
143200 |
Construction of pcc road from pitch road to Kinder Garden School at East Tartipur1 |
Completion of work |
-
latitude : 24.08748333333333,24.0878152
Longitude : 88.47147666666666,88.4686968
file name : Image_24112023104252296.png
|
2023-11-24 10:42:52.415465 |
307 |
56856125 |
CONSTRUCTION OF COMMUNITY TOILET NEAR DURGA MANDIR AT PATHARGHATA |
200000 |
CONSTRUCTION OF COMMUNITY TOILET NEAR DURGA MANDIR AT PATHARGHATA1 |
Plinth level |
-
latitude : 24.107166666666664
Longitude : 88.43103333333332
file name : Image_21012024100556055.png
|
2024-01-21 10:05:56.164007 |
308 |
56856125 |
CONSTRUCTION OF COMMUNITY TOILET NEAR DURGA MANDIR AT PATHARGHATA |
200000 |
CONSTRUCTION OF COMMUNITY TOILET NEAR DURGA MANDIR AT PATHARGHATA1 |
Completion of work |
-
latitude : 24.107188333333337
Longitude : 88.43107833333333
file name : Image_21112023083618719.png
|
2023-11-21 08:36:18.816327 |
309 |
56857764 |
CONSTRUCTION OF COVER DRAIN FROM RAJU SHOP TO FERIGHAT AT SUNDALPUR |
200000 |
CONSTRUCTION OF COVER DRAIN FROM RAJU SHOP TO FERIGHAT AT SUNDALPUR1 |
Plinth level |
-
latitude : 24.073574999999998,24.073565
Longitude : 88.49405666666668,88.49406499999999
file name : Image_29112023122336062.png
|
2023-11-29 12:23:36.189206 |
310 |
56857764 |
CONSTRUCTION OF COVER DRAIN FROM RAJU SHOP TO FERIGHAT AT SUNDALPUR |
200000 |
CONSTRUCTION OF COVER DRAIN FROM RAJU SHOP TO FERIGHAT AT SUNDALPUR1 |
Completion of work |
-
latitude : 24.073570000000004,24.073555000000002
Longitude : 88.49409333333332,88.49416500000001
file name : Image_26112023101020047.png
|
2023-11-26 10:10:20.12282 |
311 |
61388607 |
Construction of grill gate at Tartipur Sub Centre |
36200 |
Construction of grill gate at Tartipur Sub Centre1 |
Roof laid |
-
latitude : 24.08707904163748
Longitude : 88.4727587364614
file name : Image_01032023131702484.png
|
2023-03-01 13:17:02.574832 |
312 |
61388607 |
Construction of grill gate at Tartipur Sub Centre |
36200 |
Construction of grill gate at Tartipur Sub Centre1 |
Plinth level |
-
latitude : 24.087072713300586
Longitude : 88.47272763960063
file name : Image_19052022131433216.png
|
2022-05-19 13:14:33.314424 |
313 |
61388607 |
Construction of grill gate at Tartipur Sub Centre |
36200 |
Construction of grill gate at Tartipur Sub Centre1 |
Completion of work |
-
latitude : 24.086982775479555
Longitude : 88.47271825186908
file name : Image_19052022124446086.png
|
2022-05-19 12:44:46.20079 |
314 |
64980891 |
Repairing of road from Majed house to Hajera Bewa house at Sundalpur |
60000 |
Repairing of road from Majed house to Hajera Bewa house at Sundalpur1 |
Roof laid |
-
latitude : 24.018766530789435,24.071501484140754
Longitude : 88.45006423071027,88.49074336700141
file name : Image_01032023123539136.png
|
2023-03-01 12:35:39.222827 |
315 |
64980891 |
Repairing of road from Majed house to Hajera Bewa house at Sundalpur |
60000 |
Repairing of road from Majed house to Hajera Bewa house at Sundalpur1 |
Plinth level |
-
latitude : 24.071667278185487,24.071682365611196
Longitude : 88.49026861600578,88.49028965458274
file name : Image_01022023122256228.png
|
2023-02-01 12:22:56.319071 |
316 |
64980891 |
Repairing of road from Majed house to Hajera Bewa house at Sundalpur |
60000 |
Repairing of road from Majed house to Hajera Bewa house at Sundalpur1 |
Completion of work |
-
latitude : 24.07152872532606,24.071593224070966
Longitude : 88.49077169783413,88.49077966064215
file name : Image_20012023153344561.png
|
2023-01-20 15:33:44.672518 |
317 |
64980840 |
Construction of pcc road from Ramjan house to Tajem Sk house at Dharampur |
98685 |
Construction of pcc road from Ramjan house to Tajem Sk house at Dharampur1 |
Roof laid |
-
latitude : 24.08602845389396,24.086049869656563
Longitude : 88.4455986879766,88.4456404298544
file name : Image_08042023164349572.png
|
2023-04-08 16:43:49.676443 |
318 |
64980840 |
Construction of pcc road from Ramjan house to Tajem Sk house at Dharampur |
98685 |
Construction of pcc road from Ramjan house to Tajem Sk house at Dharampur1 |
Plinth level |
-
latitude : 24.08596449997276,24.08594911918044
Longitude : 88.44564487226307,88.44564881175756
file name : Image_22012023123600667.png
|
2023-01-22 12:36:00.769543 |
319 |
64980840 |
Construction of pcc road from Ramjan house to Tajem Sk house at Dharampur |
98685 |
Construction of pcc road from Ramjan house to Tajem Sk house at Dharampur1 |
Completion of work |
-
latitude : 24.085972672328353,24.086097017861903
Longitude : 88.44568728469312,88.4456898830831
file name : Image_20012023163625179.png
|
2023-01-20 16:36:25.289893 |
320 |
71174306 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.0845045,24.08358333333333,24.083588333333335
Longitude : 88.472026,88.472185,88.472185
file name : Image_03012024144951674.png
|
2024-01-03 14:49:51.769176 |
321 |
71174306 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.083618333333334,24.083615
Longitude : 88.472235,88.47224499999999
file name : Image_27122023102600346.png
|
2023-12-27 10:26:00.44186 |
322 |
71174306 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.083616666666664,24.083619999999996
Longitude : 88.47224,88.47224
file name : Image_18122023124457870.png
|
2023-12-18 12:44:57.965963 |
323 |
71173204 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.083658333333332,24.083669999999998
Longitude : 88.47508333333332,88.47509833333334
file name : Image_28122023151104523.png
|
2023-12-28 15:11:04.621445 |
324 |
71173204 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.0841421,24.0844767
Longitude : 88.4750314,88.4752374
file name : Image_28122023132033138.png
|
2023-12-28 13:20:33.23814 |
325 |
71173204 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.084093333333332,24.084088333333337
Longitude : 88.475065,88.47506
file name : Image_03122023113731162.png
|
2023-12-03 11:37:31.240778 |
326 |
71172000 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.10608666666667,24.106106666666665
Longitude : 88.471095,88.471105
file name : Image_06122023112829414.png
|
2023-12-06 11:28:29.502107 |
327 |
71172000 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.106036666666668,24.10606833333333
Longitude : 88.47112166666666,88.47111000000001
file name : Image_03122023121724489.png
|
2023-12-03 12:17:24.579003 |
328 |
71172000 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.106060000000003,24.106061666666665
Longitude : 88.47112166666666,88.47112166666666
file name : Image_01122023085230284.png
|
2023-12-01 08:52:30.37231 |
329 |
71175414 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.083236666666668,24.083211666666664
Longitude : 88.47777666666667,88.47780499999999
file name : Image_15122023111021268.png
|
2023-12-15 11:10:21.365525 |
330 |
71175414 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.08322333333333,24.083203333333337
Longitude : 88.47772333333333,88.477705
file name : Image_12122023100537877.png
|
2023-12-12 10:05:38.004532 |
331 |
71175414 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.083185000000004,24.083181666666665
Longitude : 88.47773166666666,88.47774333333334
file name : Image_03122023113434723.png
|
2023-12-03 11:34:34.807736 |
332 |
71179029 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.071524999999998,24.071523333333335
Longitude : 88.49072,88.49069999999999
file name : Image_21122023112739364.png
|
2023-12-21 11:27:39.505465 |
333 |
71179029 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.071518333333334,24.071514999999998
Longitude : 88.49073500000002,88.49072999999999
file name : Image_06122023121155068.png
|
2023-12-06 12:11:55.177683 |
334 |
71179029 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.071520000000003,24.071511666666666
Longitude : 88.49072833333334,88.49074666666665
file name : Image_02122023132047684.png
|
2023-12-02 13:20:47.77307 |
335 |
71176641 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.0830575,24.0831084
Longitude : 88.4732517,88.4737599
file name : Image_22012024133710896.png
|
2024-01-22 13:37:10.983396 |
336 |
71176641 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.0830884,24.0830884
Longitude : 88.4734009,88.4734009
file name : Image_22012024133034769.png
|
2024-01-22 13:30:34.850537 |
337 |
71176641 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.082604999999997,24.082603333333335
Longitude : 88.47325500000001,88.47321666666667
file name : Image_17012024123554021.png
|
2024-01-17 12:35:54.105795 |
338 |
71176641 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.0831872,24.0831292
Longitude : 88.4737026,88.4737868
file name : Image_15012024171223457.png
|
2024-01-15 17:12:23.585693 |
339 |
71177746 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.076710000000002,24.0775262
Longitude : 88.47998000000001,88.4801966
file name : Image_21122023111221811.png
|
2023-12-21 11:12:21.95322 |
340 |
71177746 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.07678166666667,24.07675166666667
Longitude : 88.47990999999999,88.47986999999999
file name : Image_18122023121203358.png
|
2023-12-18 12:12:03.518646 |
341 |
71177746 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.0767861,24.0767861
Longitude : 88.4804992,88.4804992
file name : Image_03122023115737597.png
|
2023-12-03 11:57:37.681413 |
342 |
56842491 |
CONSTRUCTION OF PCC ROAD FROM NIJAM MONDAL TO MONIRUL MONDAL AT SIDDHINANDI |
100000 |
CONSTRUCTION OF PCC ROAD FROM NIJAM MONDAL TO MONIRUL MONDAL AT SIDDHINANDI1 |
Plinth level |
-
latitude : 24.073334999999997,24.07332
Longitude : 88.48015666666667,88.48015666666667
file name : Image_26122023122248858.png
|
2023-12-26 12:22:48.96294 |
343 |
56842491 |
CONSTRUCTION OF PCC ROAD FROM NIJAM MONDAL TO MONIRUL MONDAL AT SIDDHINANDI |
100000 |
CONSTRUCTION OF PCC ROAD FROM NIJAM MONDAL TO MONIRUL MONDAL AT SIDDHINANDI1 |
Completion of work |
-
latitude : 24.073334999999997,24.073300000000003
Longitude : 88.480145,88.48011333333334
file name : Image_06122023134958307.png
|
2023-12-06 13:49:58.390511 |
344 |
70794974 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.098918333333337
Longitude : 88.46487499999999
file name : Image_15012024152054085.png
|
2024-01-15 15:20:54.177136 |
345 |
70794974 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.098930000000003
Longitude : 88.46489500000001
file name : Image_10012024111713609.png
|
2024-01-10 11:17:13.701744 |
346 |
70794974 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.098926666666664
Longitude : 88.46481166666666
file name : Image_30122023092841534.png
|
2023-12-30 09:28:41.622739 |
347 |
71286526 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 24.08689
Longitude : 88.44475833333333
file name : Image_12022024124226742.png
|
2024-02-12 12:42:26.843971 |
348 |
71286526 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 24.086893333333332
Longitude : 88.44478166666667
file name : Image_18012024114101779.png
|
2024-01-18 11:41:01.87545 |
349 |
71286526 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.0868
Longitude : 88.44480666666665
file name : Image_18122023154306924.png
|
2023-12-18 15:43:07.030473 |
350 |
70837852 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 24.103388333333335
Longitude : 88.46401333333333
file name : Image_21022024132052545.png
|
2024-02-21 13:20:52.65797 |
351 |
70837852 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 24.103405
Longitude : 88.46410833333333
file name : Image_10012024111252016.png
|
2024-01-10 11:12:52.127768 |
352 |
70837852 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.103391666666667
Longitude : 88.46402000000002
file name : Image_30122023091815656.png
|
2023-12-30 09:18:15.740396 |
353 |
71320248 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 24.084351666666667
Longitude : 88.47309666666666
file name : Image_22012024131724161.png
|
2024-01-22 13:17:24.2541 |
354 |
71320248 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 24.084375
Longitude : 88.47299166666666
file name : Image_10012024115242271.png
|
2024-01-10 11:52:42.363177 |
355 |
71320248 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 24.084375
Longitude : 88.47299166666666
file name : Image_10012024115238294.png
|
2024-01-10 11:52:38.389937 |
356 |
71320248 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.084411666666664
Longitude : 88.47304666666666
file name : Image_26122023124138615.png
|
2023-12-26 12:41:38.084505 |
357 |
56854737 |
CONSTRUCTION OF COMMINITY TOILET AT WEST TARTIPUR GRAVEYARD |
225000 |
CONSTRUCTION OF COMMINITY TOILET AT WEST TARTIPUR GRAVEYARD1 |
Plinth level |
-
latitude : 24.0874436
Longitude : 88.4686968
file name : Image_26122023115140609.png
|
2023-12-26 11:51:40.705676 |
358 |
56854737 |
CONSTRUCTION OF COMMINITY TOILET AT WEST TARTIPUR GRAVEYARD |
225000 |
CONSTRUCTION OF COMMINITY TOILET AT WEST TARTIPUR GRAVEYARD1 |
Completion of work |
-
latitude : 24.08699
Longitude : 88.46994666666666
file name : Image_10122023112934126.png
|
2023-12-10 11:29:34.210812 |
359 |
71272157 |
Drainage Construction |
300000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.083180000000002
Longitude : 88.47766333333333
file name : Image_08012024143906789.png
|
2024-01-08 14:39:06.918324 |
360 |
71272157 |
Drainage Construction |
300000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.083276666666666
Longitude : 88.47813999999998
file name : Image_21122023165656720.png
|
2023-12-21 16:56:56.819989 |
361 |
71272157 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.083230000000004
Longitude : 88.477465
file name : Image_16122023113124020.png
|
2023-12-16 11:31:24.108405 |
362 |
71325429 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 24.0783269
Longitude : 88.4786689
file name : Image_06032024144516050.png
|
2024-03-06 14:45:16.150605 |
363 |
71325429 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 24.0783175
Longitude : 88.4785566
file name : Image_26122023114903050.png
|
2023-12-26 11:49:01.845186 |
364 |
71325429 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.0783174
Longitude : 88.4785563
file name : Image_21122023110333700.png
|
2023-12-21 11:03:33.7991 |
365 |
65657680 |
Construction of Community Sanitary Complex |
915000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 24.074214957654476
Longitude : 88.48163441754878
file name : Image_19042023112857377.png
|
2023-04-19 11:28:57.476172 |
366 |
65657680 |
Construction of Community Sanitary Complex |
915000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.074236247688532
Longitude : 88.48163140006363
file name : Image_19122022120223401.png
|
2022-12-19 12:02:23.487182 |
367 |
65657680 |
Construction of Community Sanitary Complex |
915000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.07421126961708
Longitude : 88.48161421716213
file name : Image_27112022150722968.png
|
2022-11-27 15:07:23.065646 |
368 |
56842111 |
CONSTRUCTION OF PCC ROAD FROM HANNAN ANSARY TO RUHUL AMIN ANSARY AT KARIGARPARA |
95000 |
CONSTRUCTION OF PCC ROAD FROM HANNAN ANSARY TO RUHUL AMIN ANSARY AT KARIGARPARA1 |
Roof laid |
-
latitude : 24.0777905,24.0777828
Longitude : 88.4794584,88.480307
file name : Image_03052023134837606.png
|
2023-05-03 13:48:37.696439 |
369 |
56842111 |
CONSTRUCTION OF PCC ROAD FROM HANNAN ANSARY TO RUHUL AMIN ANSARY AT KARIGARPARA |
95000 |
CONSTRUCTION OF PCC ROAD FROM HANNAN ANSARY TO RUHUL AMIN ANSARY AT KARIGARPARA1 |
Plinth level |
-
latitude : 24.0777778,24.0777759
Longitude : 88.4803433,88.4803252
file name : Image_17042023120049874.png
|
2023-04-17 12:00:49.988018 |
370 |
56842111 |
CONSTRUCTION OF PCC ROAD FROM HANNAN ANSARY TO RUHUL AMIN ANSARY AT KARIGARPARA |
95000 |
CONSTRUCTION OF PCC ROAD FROM HANNAN ANSARY TO RUHUL AMIN ANSARY AT KARIGARPARA1 |
Completion of work |
-
latitude : 24.0777789,24.077689801342785
Longitude : 88.4803379,88.48010153509676
file name : Image_16042023173514795.png
|
2023-04-16 17:35:14.884416 |
371 |
56837314 |
CONSTRUCTION OF PCC ROAD FROM ALEM BISWAS TO JANARDANPUR SUB CENTRE AT WEST TARTIPUR |
248647 |
CONSTRUCTION OF PCC ROAD FROM ALEM BISWAS TO JANARDANPUR SUB CENTRE AT WEST TARTIPUR1 |
Roof laid |
-
latitude : 24.08845057245344,24.088366040959954
Longitude : 88.459437713027,88.45947618596256
file name : Image_16042023171010282.png
|
2023-04-16 17:10:10.367255 |
372 |
56837314 |
CONSTRUCTION OF PCC ROAD FROM ALEM BISWAS TO JANARDANPUR SUB CENTRE AT WEST TARTIPUR |
248647 |
CONSTRUCTION OF PCC ROAD FROM ALEM BISWAS TO JANARDANPUR SUB CENTRE AT WEST TARTIPUR1 |
Plinth level |
-
latitude : 24.08872788771987,24.088677428662777
Longitude : 88.45947065390646,88.45941768027842
file name : Image_13042023122359384.png
|
2023-04-13 12:23:59.471982 |
373 |
56837314 |
CONSTRUCTION OF PCC ROAD FROM ALEM BISWAS TO JANARDANPUR SUB CENTRE AT WEST TARTIPUR |
248647 |
CONSTRUCTION OF PCC ROAD FROM ALEM BISWAS TO JANARDANPUR SUB CENTRE AT WEST TARTIPUR1 |
Completion of work |
-
latitude : 24.0883973473683,24.088399652391672
Longitude : 88.45943276770413,88.45946210436523
file name : Image_08042023162640690.png
|
2023-04-08 16:26:40.784923 |
374 |
56836678 |
CONSTRUCTION OF PCC ROAD FROM OKTIYA MASZID TO DHALAI ROAD AT SOUTH TARTIPUR |
90000 |
CONSTRUCTION OF PCC ROAD FROM OKTIYA MASZID TO DHALAI ROAD AT SOUTH TARTIPUR1 |
Roof laid |
-
latitude : 24.082741666666667,24.082741666666667
Longitude : 88.46750666666667,88.46751666666665
file name : Image_31072023134910970.png
|
2023-07-31 13:49:11.065832 |
375 |
56836678 |
CONSTRUCTION OF PCC ROAD FROM OKTIYA MASZID TO DHALAI ROAD AT SOUTH TARTIPUR |
90000 |
CONSTRUCTION OF PCC ROAD FROM OKTIYA MASZID TO DHALAI ROAD AT SOUTH TARTIPUR1 |
Plinth level |
-
latitude : 24.08271994907409,24.082689732313156
Longitude : 88.46745751798153,88.46742935478687
file name : Image_16042023172230788.png
|
2023-04-16 17:22:30.864975 |
376 |
56836678 |
CONSTRUCTION OF PCC ROAD FROM OKTIYA MASZID TO DHALAI ROAD AT SOUTH TARTIPUR |
90000 |
CONSTRUCTION OF PCC ROAD FROM OKTIYA MASZID TO DHALAI ROAD AT SOUTH TARTIPUR1 |
Completion of work |
-
latitude : 24.082765001803637,24.08275523688644
Longitude : 88.46763328649104,88.46761551685631
file name : Image_06042023133029611.png
|
2023-04-06 13:30:30.775976 |
377 |
56837062 |
CONSTRUCTION O PCC ROAD FROM PITCH ROAD TO ANARUL MONDAL AT EAST TARTIPUR |
129714 |
CONSTRUCTION O PCC ROAD FROM PITCH ROAD TO ANARUL MONDAL AT EAST TARTIPUR1 |
Roof laid |
-
latitude : 24.0830408,24.0830483
Longitude : 88.4737547,88.4737712
file name : Image_31072023134716812.png
|
2023-07-31 13:47:16.892494 |
378 |
56837062 |
CONSTRUCTION O PCC ROAD FROM PITCH ROAD TO ANARUL MONDAL AT EAST TARTIPUR |
129714 |
CONSTRUCTION O PCC ROAD FROM PITCH ROAD TO ANARUL MONDAL AT EAST TARTIPUR1 |
Plinth level |
-
latitude : 24.0830699,24.08306281082332
Longitude : 88.4734901,88.47454064525664
file name : Image_19042023113551429.png
|
2023-04-19 11:35:51.524861 |
379 |
56837062 |
CONSTRUCTION O PCC ROAD FROM PITCH ROAD TO ANARUL MONDAL AT EAST TARTIPUR |
129714 |
CONSTRUCTION O PCC ROAD FROM PITCH ROAD TO ANARUL MONDAL AT EAST TARTIPUR1 |
Completion of work |
-
latitude : 24.0829762,24.083091183565557
Longitude : 88.4748159,88.47449228167534
file name : Image_08042023160013241.png
|
2023-04-08 16:00:13.3355 |
380 |
56837474 |
CONSTRUCTION OF PCC ROAD FROM RAHASEN HOUSE TO GIYAS MONDAL AT DHARAMPUR |
248647 |
CONSTRUCTION OF PCC ROAD FROM RAHASEN HOUSE TO GIYAS MONDAL AT DHARAMPUR1 |
Roof laid |
-
latitude : 24.085140000000003,24.085118333333337
Longitude : 88.471635,88.47161499999999
file name : Image_01082023151743691.png
|
2023-08-01 15:17:43.780635 |
381 |
56837474 |
CONSTRUCTION OF PCC ROAD FROM RAHASEN HOUSE TO GIYAS MONDAL AT DHARAMPUR |
248647 |
CONSTRUCTION OF PCC ROAD FROM RAHASEN HOUSE TO GIYAS MONDAL AT DHARAMPUR1 |
Plinth level |
-
latitude : 24.08465499524027,24.08465549815446
Longitude : 88.47155006602407,88.4715826716274
file name : Image_16042023171913878.png
|
2023-04-16 17:19:13.952294 |
382 |
56837474 |
CONSTRUCTION OF PCC ROAD FROM RAHASEN HOUSE TO GIYAS MONDAL AT DHARAMPUR |
248647 |
CONSTRUCTION OF PCC ROAD FROM RAHASEN HOUSE TO GIYAS MONDAL AT DHARAMPUR1 |
Completion of work |
-
latitude : 24.08471266273409,24.084722972474992
Longitude : 88.4716120082885,88.47163321450353
file name : Image_06042023133047189.png
|
2023-04-06 13:30:47.296142 |
383 |
56843583 |
CONSTRUCTION POF PCC ROAD FROM MIRSAD HOUSE TO ALIMUDDIN HOUSE AT KHAMARMATI |
125000 |
CONSTRUCTION POF PCC ROAD FROM MIRSAD HOUSE TO ALIMUDDIN HOUSE AT KHAMARMATI1 |
Plinth level |
-
latitude : 24.04389639850706,24.086584551259875
Longitude : 88.42175309546292,88.45565722323954
file name : Image_06062023120332842.png
|
2023-06-06 12:03:32.950854 |
384 |
56843583 |
CONSTRUCTION POF PCC ROAD FROM MIRSAD HOUSE TO ALIMUDDIN HOUSE AT KHAMARMATI |
125000 |
CONSTRUCTION POF PCC ROAD FROM MIRSAD HOUSE TO ALIMUDDIN HOUSE AT KHAMARMATI1 |
Completion of work |
-
latitude : 24.08666292205453,24.08661757595837
Longitude : 88.45562595874071,88.45560542307794
file name : Image_28052023174301953.png
|
2023-05-28 17:43:02.050614 |
385 |
56855601 |
CONSTRUCTION OF COMMUNITY TOILET AT RAMKRISHNSPUR EID GAHA |
200000 |
CONSTRUCTION OF COMMUNITY TOILET AT RAMKRISHNSPUR EID GAHA1 |
Roof laid |
-
latitude : 24.099071666666667
Longitude : 88.46103
file name : Image_07082023113224106.png
|
2023-08-07 11:32:24.219421 |
386 |
56855601 |
CONSTRUCTION OF COMMUNITY TOILET AT RAMKRISHNSPUR EID GAHA |
200000 |
CONSTRUCTION OF COMMUNITY TOILET AT RAMKRISHNSPUR EID GAHA1 |
Plinth level |
-
latitude : 24.099173333333336
Longitude : 88.46105333333335
file name : Image_02082023135203866.png
|
2023-08-02 13:52:05.721061 |
387 |
56855601 |
CONSTRUCTION OF COMMUNITY TOILET AT RAMKRISHNSPUR EID GAHA |
200000 |
CONSTRUCTION OF COMMUNITY TOILET AT RAMKRISHNSPUR EID GAHA1 |
Completion of work |
-
latitude : 24.099166666666665
Longitude : 88.46111833333335
file name : Image_31072023161038359.png
|
2023-07-31 16:10:38.471776 |
388 |
56836868 |
CONSTRUCTION OF PCC ROAD FROM TARTIPUR HUT TO MANTU HOUSE AT EAST TARTIPUR |
118522 |
CONSTRUCTION OF PCC ROAD FROM TARTIPUR HUT TO MANTU HOUSE AT EAST TARTIPUR1 |
Roof laid |
-
latitude : 24.08272833333333,24.08257
Longitude : 88.47527,88.47514833333335
file name : Image_31072023134709687.png
|
2023-07-31 13:47:09.787001 |
389 |
56836868 |
CONSTRUCTION OF PCC ROAD FROM TARTIPUR HUT TO MANTU HOUSE AT EAST TARTIPUR |
118522 |
CONSTRUCTION OF PCC ROAD FROM TARTIPUR HUT TO MANTU HOUSE AT EAST TARTIPUR1 |
Plinth level |
-
latitude : 24.0828864,24.0828864
Longitude : 88.4743258,88.4743258
file name : Image_31052023151951731.png
|
2023-05-31 15:19:51.820336 |
390 |
56836868 |
CONSTRUCTION OF PCC ROAD FROM TARTIPUR HUT TO MANTU HOUSE AT EAST TARTIPUR |
118522 |
CONSTRUCTION OF PCC ROAD FROM TARTIPUR HUT TO MANTU HOUSE AT EAST TARTIPUR1 |
Completion of work |
-
latitude : 24.0829597,24.082713243551552
Longitude : 88.4747696,88.47540272399783
file name : Image_28052023170658180.png
|
2023-05-28 17:06:58.28119 |
391 |
56842639 |
CONSTRUCTION OF PCC ROAD FROM AREJULLA MONDAL TO MOTI HOUSE AT SIDDHINANDI |
211171 |
CONSTRUCTION OF PCC ROAD FROM AREJULLA MONDAL TO MOTI HOUSE AT SIDDHINANDI1 |
Roof laid |
-
latitude : 24.075933333333335,24.075915000000002
Longitude : 88.47982333333333,88.47983666666666
file name : Image_31072023143539409.png
|
2023-07-31 14:35:39.520657 |
392 |
56842639 |
CONSTRUCTION OF PCC ROAD FROM AREJULLA MONDAL TO MOTI HOUSE AT SIDDHINANDI |
211171 |
CONSTRUCTION OF PCC ROAD FROM AREJULLA MONDAL TO MOTI HOUSE AT SIDDHINANDI1 |
Plinth level |
-
latitude : 24.0757481334731,24.075755132362247
Longitude : 88.47976156510413,88.47974857315421
file name : Image_29042023114549998.png
|
2023-04-29 11:45:50.104094 |
393 |
56842639 |
CONSTRUCTION OF PCC ROAD FROM AREJULLA MONDAL TO MOTI HOUSE AT SIDDHINANDI |
211171 |
CONSTRUCTION OF PCC ROAD FROM AREJULLA MONDAL TO MOTI HOUSE AT SIDDHINANDI1 |
Completion of work |
-
latitude : 24.07584766857326,24.075878388248384
Longitude : 88.47957791760564,88.47970683127642
file name : Image_16042023173752090.png
|
2023-04-16 17:37:52.173693 |
394 |
56855757 |
CONSTRUCTION OF COVER DRAIN FROM BURKANA PUKUR TO CULVERT AT TEKONA |
200000 |
CONSTRUCTION OF COVER DRAIN FROM BURKANA PUKUR TO CULVERT AT TEKONA1 |
Roof laid |
-
latitude : 24.106064999999997,24.10602833333333
Longitude : 88.47073333333334,88.47068166666668
file name : Image_02082023135828498.png
|
2023-08-02 13:58:28.640641 |
395 |
56855757 |
CONSTRUCTION OF COVER DRAIN FROM BURKANA PUKUR TO CULVERT AT TEKONA |
200000 |
CONSTRUCTION OF COVER DRAIN FROM BURKANA PUKUR TO CULVERT AT TEKONA1 |
Plinth level |
-
latitude : 24.106073104776442,24.10606937482953
Longitude : 88.47073542885482,88.47074129618704
file name : Image_01062023141422321.png
|
2023-06-01 14:14:22.44477 |
396 |
56855757 |
CONSTRUCTION OF COVER DRAIN FROM BURKANA PUKUR TO CULVERT AT TEKONA |
200000 |
CONSTRUCTION OF COVER DRAIN FROM BURKANA PUKUR TO CULVERT AT TEKONA1 |
Completion of work |
-
latitude : 24.018709659576416,24.018709659576416
Longitude : 88.45000044442713,88.45000044442713
file name : Image_01062023140742709.png
|
2023-06-01 14:07:42.839017 |
397 |
56856944 |
CONSTRUCTION OF COMMUNITY TOILET AT KALUDIAR GRAVEYARD |
200000 |
CONSTRUCTION OF COMMUNITY TOILET AT KALUDIAR GRAVEYARD 1 |
Plinth level |
-
latitude : 24.09704166666667
Longitude : 88.48904333333333
file name : Image_02082023153155290.png
|
2023-08-02 15:31:55.394057 |
398 |
56856944 |
CONSTRUCTION OF COMMUNITY TOILET AT KALUDIAR GRAVEYARD |
200000 |
CONSTRUCTION OF COMMUNITY TOILET AT KALUDIAR GRAVEYARD 1 |
Completion of work |
-
latitude : 24.09702333333333
Longitude : 88.48905500000001
file name : Image_01082023141541510.png
|
2023-08-01 14:15:41.739218 |
399 |
56857574 |
REPAIRING OF TOILET AT GROUND FLOOR DHARAMPUR GP OFFICE |
150000 |
REPAIRING OF TOILET AT GROUND FLOOR DHARAMPUR GP OFFICE1 |
Roof laid |
-
latitude : 24.0846611
Longitude : 88.4751756
file name : Image_07082023120240913.png
|
2023-08-07 12:02:41.0233 |
400 |
56857574 |
REPAIRING OF TOILET AT GROUND FLOOR DHARAMPUR GP OFFICE |
150000 |
REPAIRING OF TOILET AT GROUND FLOOR DHARAMPUR GP OFFICE1 |
Plinth level |
-
latitude : 24.0845228
Longitude : 88.4751674
file name : Image_26072023144316191.png
|
2023-07-26 14:43:16.295601 |
401 |
56857574 |
REPAIRING OF TOILET AT GROUND FLOOR DHARAMPUR GP OFFICE |
150000 |
REPAIRING OF TOILET AT GROUND FLOOR DHARAMPUR GP OFFICE1 |
Completion of work |
-
latitude : 24.0846876
Longitude : 88.475176
file name : Image_26072023114725783.png
|
2023-07-26 11:47:25.877882 |
402 |
56843229 |
CONSTRUCTION OF PCC ROAD FROM AJIT MONDAL HOUSE TO PITCH ROAD AT REJLAPARA |
80241 |
CONSTRUCTION OF PCC ROAD FROM AJIT MONDAL HOUSE TO PITCH ROAD AT REJLAPARA1 |
Roof laid |
-
latitude : 24.0796624,24.0798261
Longitude : 88.4796885,88.4796552
file name : Image_31072023140018438.png
|
2023-07-31 14:00:18.531982 |
403 |
56843229 |
CONSTRUCTION OF PCC ROAD FROM AJIT MONDAL HOUSE TO PITCH ROAD AT REJLAPARA |
80241 |
CONSTRUCTION OF PCC ROAD FROM AJIT MONDAL HOUSE TO PITCH ROAD AT REJLAPARA1 |
Plinth level |
-
latitude : 24.0797308,24.079733
Longitude : 88.4796766,88.4796781
file name : Image_31052023113447363.png
|
2023-05-31 11:34:47.458896 |
404 |
56843229 |
CONSTRUCTION OF PCC ROAD FROM AJIT MONDAL HOUSE TO PITCH ROAD AT REJLAPARA |
80241 |
CONSTRUCTION OF PCC ROAD FROM AJIT MONDAL HOUSE TO PITCH ROAD AT REJLAPARA1 |
Completion of work |
-
latitude : 24.0796755,24.0796755
Longitude : 88.4796817,88.4796817
file name : Image_28052023165452351.png
|
2023-05-28 16:54:52.445239 |
405 |
57121943 |
MAKING OF SOAK PIT NEAR SIDDHINANDI EID GAHA |
100000 |
MAKING OF SOAK PIT NEAR SIDDHINANDI EID GAHA 1 |
Plinth level |
-
latitude : 24.073806666666663
Longitude : 88.47999166666665
file name : Image_01082023135909901.png
|
2023-08-01 13:59:09.988451 |
406 |
57121943 |
MAKING OF SOAK PIT NEAR SIDDHINANDI EID GAHA |
100000 |
MAKING OF SOAK PIT NEAR SIDDHINANDI EID GAHA 1 |
Completion of work |
-
latitude : 24.073868333333333
Longitude : 88.47993166666666
file name : Image_31072023143547226.png
|
2023-07-31 14:35:47.317319 |
407 |
71221233 |
Construction of Water treatment plant |
900000 |
Construction of Water treatment plant1 |
Roof laid |
-
latitude : 24.082391666666663
Longitude : 88.46986166666666
file name : Image_20062024145106544.png
|
2024-06-20 14:51:06.659458 |
408 |
71221233 |
Construction of Water treatment plant |
900000 |
Construction of Water treatment plant1 |
Plinth level |
-
latitude : 24.08235833333333
Longitude : 88.46984833333333
file name : Image_20062024122220188.png
|
2024-06-20 12:22:20.279242 |
409 |
71221233 |
Construction of Water treatment plant |
900000 |
Construction of Water treatment plant1 |
Plinth level |
-
latitude : 24.0826201
Longitude : 88.4697021
file name : Image_12062024113342354.png
|
2024-06-12 11:33:42.480916 |
410 |
71221233 |
Construction of Water treatment plant |
900000 |
Construction of Water treatment plant1 |
Completion of work |
-
latitude : 24.08236
Longitude : 88.46981499999998
file name : Image_24052024113046918.png
|
2024-05-24 11:30:47.016123 |
411 |
71219757 |
Drinking water facility |
900000 |
Drinking water facility1 |
Roof laid |
-
latitude : 24.087808333333335
Longitude : 88.47162333333333
file name : Image_20062024123405649.png
|
2024-06-20 12:34:05.746963 |
412 |
71219757 |
Drinking water facility |
900000 |
Drinking water facility1 |
Plinth level |
-
latitude : 24.087806666666665
Longitude : 88.47156666666666
file name : Image_12062024112748971.png
|
2024-06-12 11:27:49.101649 |
413 |
71219757 |
Drinking water facility |
900000 |
Drinking water facility1 |
Completion of work |
-
latitude : 24.088109999999997
Longitude : 88.47167499999999
file name : Image_24052024112004752.png
|
2024-05-24 11:20:04.846332 |
414 |
70899663 |
Solar light in Anganwadi Centres |
75154 |
installation of solar light pruy school at dharampur |
Roof laid |
-
latitude : 24.08673666666667
Longitude : 88.44035333333335
file name : Image_13072024114311423.png
|
2024-07-13 11:43:11.535103 |
415 |
70899663 |
Solar light in Anganwadi Centres |
75154 |
installation of solar light pruy school at dharampur |
Plinth level |
-
latitude : 24.086713333333332
Longitude : 88.44042833333333
file name : Image_13072024113026908.png
|
2024-07-13 11:30:27.0405 |
416 |
70899663 |
Solar light in Anganwadi Centres |
75154 |
installation of solar light pruy school at dharampur |
Completion of work |
-
latitude : 24.087490000000003
Longitude : 88.44302333333331
file name : Image_22062024092459094.png
|
2024-06-22 09:24:59.177261 |
417 |
71170779 |
Installation of Solar lights |
75154 |
Installation of Solar lights1 |
Roof laid |
-
latitude : 24.093373333333336
Longitude : 88.43930999999999
file name : Image_13072024115053483.png
|
2024-07-13 11:50:53.603749 |
418 |
71170779 |
Installation of Solar lights |
75154 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 24.093425000000003
Longitude : 88.43928333333334
file name : Image_13072024112521093.png
|
2024-07-13 11:25:21.193355 |
419 |
71170779 |
Installation of Solar lights |
75154 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 24.09355333333333
Longitude : 88.43948
file name : Image_22062024093430382.png
|
2024-06-22 09:34:30.490921 |
420 |
70890077 |
Use of LED buls/LED tubelights for street lights |
75154 |
Use of LED buls/LED tubelights for street lights1 |
Roof laid |
-
latitude : 24.103746666666666
Longitude : 88.43661500000002
file name : Image_13072024111658249.png
|
2024-07-13 11:16:58.362134 |
421 |
70890077 |
Use of LED buls/LED tubelights for street lights |
75154 |
Use of LED buls/LED tubelights for street lights1 |
Plinth level |
-
latitude : 24.103688333333334
Longitude : 88.43663
file name : Image_13072024110640267.png
|
2024-07-13 11:06:40.389094 |
422 |
70890077 |
Use of LED buls/LED tubelights for street lights |
75154 |
Use of LED buls/LED tubelights for street lights1 |
Completion of work |
-
latitude : 24.10336
Longitude : 88.43699166666666
file name : Image_01072024142908101.png
|
2024-07-01 14:29:08.246685 |
423 |
71323283 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 24.0829463
Longitude : 88.4716744
file name : Image_01032024143800885.png
|
2024-03-01 14:38:00.974788 |
424 |
71323283 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 24.08292833333333
Longitude : 88.47139999999999
file name : Image_12022024130142562.png
|
2024-02-12 13:01:42.656309 |
425 |
71323283 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.08277333333333
Longitude : 88.471515
file name : Image_18122023154247576.png
|
2023-12-18 15:42:47.668744 |
426 |
71168594 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.09668333333333,24.0963999
Longitude : 88.43446666666665,88.4345028
file name : Image_11122023105256945.png
|
2023-12-11 10:52:57.027304 |
427 |
71168594 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.096713333333334,24.096704999999996
Longitude : 88.43441833333333,88.434425
file name : Image_06122023105456334.png
|
2023-12-06 10:54:56.431221 |
428 |
71168594 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.096631666666667,24.096619999999998
Longitude : 88.43449000000001,88.434445
file name : Image_02122023081642523.png
|
2023-12-02 08:16:42.611936 |
429 |
70792013 |
Greywater management system |
200000 |
Greywater management system1 |
Roof laid |
-
latitude : 24.098091666666665
Longitude : 88.44023166666666
file name : Image_28122023145821531.png
|
2023-12-28 14:58:21.621465 |
430 |
70792013 |
Greywater management system |
200000 |
Greywater management system1 |
Plinth level |
-
latitude : 24.097558333333335
Longitude : 88.44004000000001
file name : Image_20122023105431274.png
|
2023-12-20 10:54:31.369091 |
431 |
70792013 |
Greywater management system |
200000 |
Greywater management system1 |
Completion of work |
-
latitude : 24.097545
Longitude : 88.44000499999999
file name : Image_16122023131705858.png
|
2023-12-16 13:17:05.954108 |
432 |
70826106 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.08944166666667
Longitude : 88.45871000000001
file name : Image_15012024153716923.png
|
2024-01-15 15:37:17.027841 |
433 |
70826106 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.090208333333333
Longitude : 88.45938833333334
file name : Image_10012024115234458.png
|
2024-01-10 11:52:34.545647 |
434 |
70826106 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.089476666666663
Longitude : 88.45855333333333
file name : Image_30122023094548213.png
|
2023-12-30 09:45:48.291965 |
435 |
71299696 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 24.0872807
Longitude : 88.4668197
file name : Image_06032024140606143.png
|
2024-03-06 14:06:06.229142 |
436 |
71299696 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 24.08715666666667
Longitude : 88.467875
file name : Image_12022024125316263.png
|
2024-02-12 12:53:16.345303 |
437 |
71299696 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.08717
Longitude : 88.46787833333335
file name : Image_10122023113721686.png
|
2023-12-10 11:37:21.763056 |
438 |
71269738 |
Drainage Construction |
300000 |
Drainage Construction1 |
Roof laid |
-
latitude : 24.083325
Longitude : 88.47794666666665
file name : Image_08012024144033616.png
|
2024-01-08 14:40:33.764643 |
439 |
71269738 |
Drainage Construction |
300000 |
Drainage Construction1 |
Plinth level |
-
latitude : 24.083270000000002
Longitude : 88.47819666666668
file name : Image_21122023165659713.png
|
2023-12-21 16:56:59.807 |
440 |
71269738 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 24.08321
Longitude : 88.47764166666666
file name : Image_16122023112701596.png
|
2023-12-16 11:27:01.679557 |
441 |
70892896 |
Solar light in community centre |
75154 |
Solar light in community centre1 |
Roof laid |
-
latitude : 24.10356
Longitude : 88.43701666666666
file name : Image_13072024111436161.png
|
2024-07-13 11:14:36.272191 |
442 |
70892896 |
Solar light in community centre |
75154 |
Solar light in community centre1 |
Plinth level |
-
latitude : 24.103456666666663
Longitude : 88.43698333333332
file name : Image_13072024110506913.png
|
2024-07-13 11:05:07.000425 |
443 |
70892896 |
Solar light in community centre |
75154 |
Solar light in community centre1 |
Completion of work |
-
latitude : 24.103593333333333
Longitude : 88.43668333333332
file name : Image_22062024094523363.png
|
2024-06-22 09:45:23.476336 |
444 |
71222898 |
Drinking water facilities |
900000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 24.088805
Longitude : 88.45472333333333
file name : Image_29072024110743952.png
|
2024-07-29 11:07:44.044005 |
445 |
71222898 |
Drinking water facilities |
900000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 24.088910000000002
Longitude : 88.45478
file name : Image_22072024112627111.png
|
2024-07-22 11:26:27.200855 |
446 |
71222898 |
Drinking water facilities |
900000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 24.088853333333336
Longitude : 88.45476833333332
file name : Image_08072024111034983.png
|
2024-07-08 11:10:35.101241 |
447 |
71180125 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.073301666666666,24.073325
Longitude : 88.48038,88.48038166666666
file name : Image_21122023111838543.png
|
2023-12-21 11:18:38.638875 |
448 |
71180125 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.073339999999998,24.07331166666667
Longitude : 88.48040333333331,88.48044
file name : Image_16122023105920118.png
|
2023-12-16 10:59:20.216546 |
449 |
71180125 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.07333833333333,24.073375000000002
Longitude : 88.48033666666667,88.48036666666667
file name : Image_06122023134722980.png
|
2023-12-06 13:47:23.067514 |
450 |
96598358 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.090625,24.090635
Longitude : 88.45927666666667,88.45929666666667
file name : Image_15032024170220237.png
|
2024-03-15 17:02:20.344855 |
451 |
96598358 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.090645000000002,24.09065666666667
Longitude : 88.45935666666668,88.45934166666666
file name : Image_15032024165647235.png
|
2024-03-15 16:56:47.334734 |
452 |
96598358 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.09060833333333,24.090601666666664
Longitude : 88.45929666666667,88.45929
file name : Image_14032024164508111.png
|
2024-03-14 16:45:08.199669 |
453 |
96601036 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.09307666666667,24.0855465
Longitude : 88.45057999999999,88.4725088
file name : Image_31072024140625463.png
|
2024-07-31 14:06:25.557502 |
454 |
96601036 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.085598333333337,24.085563333333333
Longitude : 88.47217166666665,88.47217166666665
file name : Image_29072024111900244.png
|
2024-07-29 11:19:00.362844 |
455 |
96601036 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.08566,24.08564666666667
Longitude : 88.472255,88.47225833333331
file name : Image_27072024102026480.png
|
2024-07-27 10:20:26.625826 |
456 |
96604030 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.07361,24.073676666666664
Longitude : 88.48007666666666,88.48015
file name : Image_17082024123330970.png
|
2024-08-17 12:33:31.071386 |
457 |
96604030 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.092861666666668,24.07359666666667
Longitude : 88.45029500000001,88.480045
file name : Image_09082024113718784.png
|
2024-08-09 11:37:18.927487 |
458 |
96604030 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.073561666666667,24.073565
Longitude : 88.48007833333334,88.48008833333333
file name : Image_27072024105709708.png
|
2024-07-27 10:57:09.815094 |
459 |
96608115 |
Construction of roads |
176000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.07351833333333,24.073481666666666
Longitude : 88.494135,88.49410833333334
file name : Image_30092024153642594.png
|
2024-09-30 15:36:42.681227 |
460 |
96608115 |
Construction of roads |
176000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.073445,24.073480000000004
Longitude : 88.49394499999998,88.49391333333332
file name : Image_25092024132850981.png
|
2024-09-25 13:28:51.061236 |
461 |
96608115 |
Construction of roads |
176000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.073021666666666,24.073030000000003
Longitude : 88.49527333333332,88.495275
file name : Image_27072024110557945.png
|
2024-07-27 11:05:58.029428 |
462 |
96597139 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.092958333333332,24.09295666666667
Longitude : 88.45024166666666,88.45025499999998
file name : Image_07082024121447383.png
|
2024-08-07 12:14:47.484469 |
463 |
96597139 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.09306333333333,24.092991666666663
Longitude : 88.45022499999999,88.45026333333333
file name : Image_31072024111933741.png
|
2024-07-31 11:19:33.836761 |
464 |
96597139 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.093011666666666,24.093028333333336
Longitude : 88.45031166666668,88.450305
file name : Image_27072024100147565.png
|
2024-07-27 10:01:47.718251 |
465 |
96596081 |
Construction of roads |
140000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.09972,24.099746666666668
Longitude : 88.43681166666666,88.43681166666666
file name : Image_29072024105329677.png
|
2024-07-29 10:53:29.772669 |
466 |
96623309 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.0780326,24.0780326
Longitude : 88.4788133,88.4788133
file name : Image_01092024115904946.png
|
2024-09-01 11:59:05.804628 |
467 |
96623309 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.0780341,24.0780341,24.0780328
Longitude : 88.4788096,88.4788096,88.4788098
file name : Image_01092024115625174.png
|
2024-09-01 11:56:25.99852 |
468 |
96623309 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.0787217,24.0787219
Longitude : 88.4784241,88.4784242
file name : Image_22082024121956592.png
|
2024-08-22 12:19:56.685156 |
469 |
96623309 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.0780321,24.0780387
Longitude : 88.4788066,88.4787998
file name : Image_09082024110815082.png
|