1 |
34878429 |
Maintainance of Arsenic free Tubewell Construction of Platform |
297900 |
Maintainance of Arsenic free Tubewell Construction of Platform 1 |
Completion of work |
-
latitude : 24.13847091
Longitude : 88.67382743
file name : Image_26022021115701796.png
|
2021-02-26 11:57:01.892925 |
2 |
34808169 |
Maintainance of Arsenic free Tubewell with Construction of Platform |
381164 |
Maintainance of Arsenic free Tubewell with Construction of Platform 1 |
Completion of work |
-
latitude : 24.12760342
Longitude : 88.68993924
file name : Image_26022021114924358.png
|
2021-02-26 11:49:24.445265 |
3 |
67700147 |
Installation of Information Board |
73000 |
Installation of Information Board1 |
|
-
latitude : 24.1275415
Longitude : 88.6897668
file name : Image_27122023170359710.png
|
2023-12-27 17:03:59.797907 |
4 |
67700926 |
Internet in GP Bhawan |
100000 |
Internet in GP Bhawan1 |
Roof laid |
-
latitude : 24.1275567
Longitude : 88.6897664
file name : Image_27122023172035356.png
|
2023-12-27 17:20:35.488625 |
5 |
67700926 |
Internet in GP Bhawan |
100000 |
Internet in GP Bhawan1 |
Plinth level |
-
latitude : 24.1275392
Longitude : 88.6897681
file name : Image_27122023171309367.png
|
2023-12-27 17:13:09.480558 |
6 |
67700926 |
Internet in GP Bhawan |
100000 |
Internet in GP Bhawan1 |
Completion of work |
-
latitude : 24.127578
Longitude : 88.6897526
file name : Image_27122023170428799.png
|
2023-12-27 17:04:28.928179 |
7 |
67624639 |
Chlorinization of drinking water source |
46295 |
Chlorinization of drinking water source1 |
Roof laid |
-
latitude : 24.1275586
Longitude : 88.6897688
file name : Image_27122023171906342.png
|
2023-12-27 17:19:06.432541 |
8 |
67624639 |
Chlorinization of drinking water source |
46295 |
Chlorinization of drinking water source1 |
Plinth level |
-
latitude : 24.1275457
Longitude : 88.6897661
file name : Image_27122023171051723.png
|
2023-12-27 17:10:51.826149 |
9 |
67624639 |
Chlorinization of drinking water source |
46295 |
Chlorinization of drinking water source1 |
Completion of work |
-
latitude : 24.1275387
Longitude : 88.6897665
file name : Image_27122023170227044.png
|
2023-12-27 17:02:27.140549 |
10 |
67699305 |
Electricity in GP Bhawan |
200000 |
Electricity in GP Bhawan1 |
Roof laid |
-
latitude : 24.1275536
Longitude : 88.6897643
file name : Image_27122023172007800.png
|
2023-12-27 17:20:07.918994 |
11 |
67699305 |
Electricity in GP Bhawan |
200000 |
Electricity in GP Bhawan1 |
Plinth level |
-
latitude : 24.1275357
Longitude : 88.689767
file name : Image_27122023171232205.png
|
2023-12-27 17:12:32.308393 |
12 |
67699305 |
Electricity in GP Bhawan |
200000 |
Electricity in GP Bhawan1 |
Completion of work |
-
latitude : 24.1275373
Longitude : 88.6897698
file name : Image_27122023170327680.png
|
2023-12-27 17:03:27.788725 |
13 |
47489303 |
Repairing & maintanance of Solar Light under Jalangi GP |
140000 |
Repairing & maintanance of Solar Light under Jalangi GP1 |
Plinth level |
-
latitude : 24.1273735
Longitude : 88.6900775
file name : Image_02062022141617244.png
|
2022-06-02 14:16:17.338672 |
14 |
47489303 |
Repairing & maintanance of Solar Light under Jalangi GP |
140000 |
Repairing & maintanance of Solar Light under Jalangi GP1 |
Completion of work |
-
latitude : 24.1276829
Longitude : 88.6897725
file name : Image_02062022141042853.png
|
2022-06-02 14:10:42.949149 |
15 |
47480928 |
Maintainance of various Sajaldhara under Jalangi GP |
200000 |
Maintainance of various Sajaldhara under Jalangi GP1 |
Plinth level |
-
latitude : 24.1275244
Longitude : 88.6897819
file name : Image_22062022144427212.png
|
2022-06-22 14:44:27.326408 |
16 |
47480928 |
Maintainance of various Sajaldhara under Jalangi GP |
200000 |
Maintainance of various Sajaldhara under Jalangi GP1 |
Completion of work |
-
latitude : 24.127659
Longitude : 88.6897633
file name : Image_22062022142116294.png
|
2022-06-22 14:21:16.386499 |
17 |
63915809 |
Installation of solar submercible pump at goraipur math |
579279 |
Installation of solar submercible pump at goraipur math1 |
Plinth level |
-
latitude : 24.1275053
Longitude : 88.6897879
file name : Image_28062022184713392.png
|
2022-06-28 18:47:13.536546 |
18 |
63915809 |
Installation of solar submercible pump at goraipur math |
579279 |
Installation of solar submercible pump at goraipur math1 |
Plinth level |
-
latitude : 24.1275053
Longitude : 88.6897879
file name : Image_28062022184716188.png
|
2022-06-28 18:47:16.324304 |
19 |
63915809 |
Installation of solar submercible pump at goraipur math |
579279 |
Installation of solar submercible pump at goraipur math1 |
Completion of work |
-
latitude : 24.1370384
Longitude : 88.68763035
file name : Image_28062022182218794.png
|
2022-06-28 18:22:18.887705 |
20 |
63915666 |
Instalation of Solar Submersible pump at goraipur math |
579569 |
Instalation of Solar Submersible pump at goraipur math1 |
Plinth level |
-
latitude : 24.127636
Longitude : 88.6897526
file name : Image_28062022184710145.png
|
2022-06-28 18:47:10.232125 |
21 |
63915666 |
Instalation of Solar Submersible pump at goraipur math |
579569 |
Instalation of Solar Submersible pump at goraipur math1 |
Completion of work |
-
latitude : 24.13703496
Longitude : 88.68768819
file name : Image_28062022182205155.png
|
2022-06-28 18:22:05.245493 |
22 |
63916089 |
Improvement of road by pilling work with sal ballah from the house of Meghu sk towards the house of |
165000 |
Improvement of road by pilling work with sal ballah from the house of Meghu sk towards the house of 1 |
Completion of work |
-
latitude : 24.1275216,24.1275216
Longitude : 88.6897875,88.6897875
file name : Image_30062022110432068.png
|
2022-06-30 11:04:32.151675 |
23 |
63915744 |
Instalation of Solar Submercible pump at hukahara nandalalpur math |
500000 |
Instalation of Solar Submercible pump at hukahara nandalalpur math 1 |
Completion of work |
-
latitude : 24.13701462
Longitude : 88.68767738
file name : Image_28062022182259718.png
|
2022-06-28 18:22:59.818163 |
24 |
63915744 |
Instalation of Solar Submercible pump at hukahara nandalalpur math |
500000 |
Instalation of Solar Submercible pump at hukahara nandalalpur math 1 |
Completion of work |
-
latitude : 24.13705435
Longitude : 88.68768504
file name : Image_28062022174106292.png
|
2022-06-28 17:41:06.381326 |
25 |
47483351 |
Construction of PCC road from the house of Mahabul Islam towards the house of Emajuddin at Hukahara |
350000 |
Construction of PCC road from the house of Mahabul Islam towards the house of Emajuddin at Hukahara1 |
Completion of work |
-
latitude : 24.13676841,24.13677076
Longitude : 88.67551432,88.67552307
file name : Image_19072022161611448.png
|
2022-07-19 16:16:11.558329 |
26 |
34775939 |
Construction of PCC road from the house of Nasir Sarkar at Hukahara |
189901 |
Construction of PCC road from the house of Nasir Sarkar at Hukahara 1 |
Roof laid |
-
latitude : 24.13417015,24.13418902
Longitude : 88.67659266,88.67659307
file name : Image_01062023150916025.png
|
2023-06-01 15:09:16.14883 |
27 |
34775939 |
Construction of PCC road from the house of Nasir Sarkar at Hukahara |
189901 |
Construction of PCC road from the house of Nasir Sarkar at Hukahara 1 |
Plinth level |
-
latitude : 24.13428132,24.13426787
Longitude : 88.67645793,88.67645547
file name : Image_01062023150201755.png
|
2023-06-01 15:02:01.85006 |
28 |
34775939 |
Construction of PCC road from the house of Nasir Sarkar at Hukahara |
189901 |
Construction of PCC road from the house of Nasir Sarkar at Hukahara 1 |
Completion of work |
-
latitude : 24.13431866,24.13435487
Longitude : 88.6769922,88.6767768
file name : Image_15012021135435261.png
|
2021-01-15 13:54:35.353299 |
29 |
63915915 |
Installation of a2 Tubewell infornt of Flood Protection shelter at Charbhadra Chor Land |
110000 |
Installation of a2 Tubewell infornt of Flood Protection shelter at Charbhadra Chor Land1 |
Completion of work |
-
latitude : 24.12777218
Longitude : 88.69326591
file name : Image_27092022143329316.png
|
2022-09-27 14:33:29.412293 |
30 |
65593818 |
Instalation of solar light near Debnathpara Durga Mandir at Joykrishnapur |
100000 |
Instalation of solar light near Debnathpara Durga Mandir at Joykrishnapur1 |
Completion of work |
-
latitude : 24.13245151
Longitude : 88.69252945
file name : Image_09122022155637062.png
|
2022-12-09 15:56:37.213969 |
31 |
65593857 |
Instalation of solar light infront of house of Punka Bewa at Gouripur Kalani |
100000 |
Instalation of solar light infront of house of Punka Bewa at Gouripur Kalani1 |
Completion of work |
-
latitude : 24.13313717
Longitude : 88.68543313
file name : Image_09122022154657645.png
|
2022-12-09 15:46:57.831974 |
32 |
66174760 |
Instalation of solar light near Hukahara Kuthirpara Durga Mandir at Hukahara |
100000 |
Instalation of solar light near Hukahara Kuthirpara Durga Mandir at Hukahara1 |
Completion of work |
-
latitude : 24.13409641
Longitude : 88.6733301
file name : Image_09122022153914088.png
|
2022-12-09 15:39:14.213476 |
33 |
66174747 |
Instalation of solar light near Gouripur Halder Para Durga Mandir at Gouripur |
100000 |
Instalation of solar light near Gouripur Halder Para Durga Mandir at Gouripur1 |
Completion of work |
-
latitude : 24.1312701
Longitude : 88.6868591
file name : Image_09122022154705467.png
|
2022-12-09 15:47:05.599436 |
34 |
66175009 |
Instalation of solar light infornt of Joykrishnapur Sanjoy Halder House at Joykrishnapur |
100000 |
Instalation of solar light infornt of Joykrishnapur Sanjoy Halder House at Joykrishnapur1 |
Completion of work |
-
latitude : 24.12848912
Longitude : 88.69175702
file name : Image_09122022160012312.png
|
2022-12-09 16:00:12.445765 |
35 |
66174678 |
Instalation of solar light infornt of Samsul Sekh House at Joykrishnapur |
100000 |
Instalation of solar light infornt of Samsul Sekh House at Joykrishnapur1 |
Completion of work |
-
latitude : 24.13594795
Longitude : 88.69249404
file name : Image_09122022155418515.png
|
2022-12-09 15:54:18.657246 |
36 |
66420236 |
Creation of a new source of drinking water |
99030 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.1274245
Longitude : 88.6897629
file name : Image_20012023143648325.png
|
2023-01-20 14:36:48.426003 |
37 |
66420364 |
Providing piped water supply to public institutions |
32930 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 24.1275346
Longitude : 88.689763
file name : Image_20012023143741640.png
|
2023-01-20 14:37:41.739921 |
38 |
66420770 |
Operation & maintenance of community sanitary complex |
100000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 24.1275106
Longitude : 88.689838
file name : Image_20012023143600394.png
|
2023-01-20 14:36:00.493159 |
39 |
66175055 |
Construction of Community Sanitary Complex |
70000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.1266611
Longitude : 88.6915051
file name : Image_27012023143548068.png
|
2023-01-27 14:35:48.18102 |
40 |
66174706 |
Instalation of solar light near Joykrishnapur Halder Para Durga Mandir at Joykrishnapur |
100000 |
Instalation of solar light near Joykrishnapur Halder Para Durga Mandir at Joykrishnapur1 |
Completion of work |
-
latitude : 24.1281898
Longitude : 88.6897282
file name : Image_18022023140139719.png
|
2023-02-18 14:01:39.827295 |
41 |
66174706 |
Instalation of solar light near Joykrishnapur Halder Para Durga Mandir at Joykrishnapur |
100000 |
Instalation of solar light near Joykrishnapur Halder Para Durga Mandir at Joykrishnapur1 |
Completion of work |
-
latitude : 24.1281898
Longitude : 88.6897282
file name : Image_18022023140154607.png
|
2023-02-18 14:01:54.712205 |
42 |
66175019 |
Instalation of solar light infornt of Joykrishnapur Bhum Dutta House at Jalangi |
100000 |
Instalation of solar light infornt of Joykrishnapur Bhum Dutta House at Jalangi 1 |
Completion of work |
-
latitude : 24.1261733
Longitude : 88.6939073
file name : Image_18022023140147161.png
|
2023-02-18 14:01:47.282371 |
43 |
66175019 |
Instalation of solar light infornt of Joykrishnapur Bhum Dutta House at Jalangi |
100000 |
Instalation of solar light infornt of Joykrishnapur Bhum Dutta House at Jalangi 1 |
Completion of work |
-
latitude : 24.1261733
Longitude : 88.6939073
file name : Image_18022023140201709.png
|
2023-02-18 14:02:01.831236 |
44 |
66174723 |
Instalation of solar light near Uttar Para Laxmi Mandir at Hukahara |
100000 |
Instalation of solar light near Uttar Para Laxmi Mandir at Hukahara1 |
Completion of work |
-
latitude : 24.14384549
Longitude : 88.68200879
file name : Image_18022023140136281.png
|
2023-02-18 14:01:36.419635 |
45 |
66174723 |
Instalation of solar light near Uttar Para Laxmi Mandir at Hukahara |
100000 |
Instalation of solar light near Uttar Para Laxmi Mandir at Hukahara1 |
Completion of work |
-
latitude : 24.14384549
Longitude : 88.68200879
file name : Image_18022023140151091.png
|
2023-02-18 14:01:51.250865 |
46 |
66174776 |
Instalation of solar near Hukahara sardar para durga mandir at Hukahara |
100000 |
Instalation of solar near Hukahara sardar para durga mandir at Hukahara1 |
Completion of work |
-
latitude : 24.1275504
Longitude : 88.6898017
file name : Image_18022023140132137.png
|
2023-02-18 14:01:32.263145 |
47 |
66174764 |
Instalation of solar light infront of FUC Club at Jalangi |
100000 |
Instalation of solar light infront of FUC Club at Jalangi1 |
Completion of work |
-
latitude : 24.127323
Longitude : 88.6890099
file name : Image_18022023140143476.png
|
2023-02-18 14:01:43.596726 |
48 |
66174764 |
Instalation of solar light infront of FUC Club at Jalangi |
100000 |
Instalation of solar light infront of FUC Club at Jalangi1 |
Completion of work |
-
latitude : 24.127323
Longitude : 88.6890099
file name : Image_18022023140158175.png
|
2023-02-18 14:01:58.299212 |
49 |
56502403 |
construction of toilet at hukahara gorasthan |
300000 |
construction of toilet at hukahara gorasthan 1 |
Roof laid |
-
latitude : 24.13785233
Longitude : 88.6778854
file name : Image_01062023153021669.png
|
2023-06-01 15:30:21.800346 |
50 |
56502403 |
construction of toilet at hukahara gorasthan |
300000 |
construction of toilet at hukahara gorasthan 1 |
Plinth level |
-
latitude : 24.13782255
Longitude : 88.67790348
file name : Image_01062023152347894.png
|
2023-06-01 15:23:48.039767 |
51 |
56502403 |
construction of toilet at hukahara gorasthan |
300000 |
construction of toilet at hukahara gorasthan 1 |
Completion of work |
-
latitude : 24.13781276
Longitude : 88.67792519
file name : Image_10052023131339027.png
|
2023-05-10 13:13:39.13756 |
52 |
56502403 |
construction of toilet at hukahara gorasthan |
300000 |
construction of toilet at hukahara gorasthan 1 |
Completion of work |
-
latitude : 24.13781276
Longitude : 88.67792519
file name : Image_10052023131329366.png
|
2023-05-10 13:13:29.47826 |
53 |
68539656 |
Grey water management — collection infrastructure |
650000 |
Grey water management — collection infrastructure1 |
Completion of work |
-
latitude : 24.1364424
Longitude : 88.67946516
file name : Image_10052023131332531.png
|
2023-05-10 13:13:32.739321 |
54 |
68539642 |
Grey water management — collection infrastructure |
650000 |
Grey water management — collection infrastructure1 |
Completion of work |
-
latitude : 24.127558
Longitude : 88.6897721
file name : Image_10052023123936128.png
|
2023-05-10 12:39:36.224851 |
55 |
47473109 |
Construction of PCC road from the house of Mahibul towards new eid gaha at gouripur. |
355907 |
Construction of PCC road from the house of Mahibul towards new eid gaha at gouripur.1 |
Roof laid |
-
latitude : 24.13511028,24.13511521
Longitude : 88.68798965,88.68798515
file name : Image_01062023123920015.png
|
2023-06-01 12:39:20.117734 |
56 |
47473109 |
Construction of PCC road from the house of Mahibul towards new eid gaha at gouripur. |
355907 |
Construction of PCC road from the house of Mahibul towards new eid gaha at gouripur.1 |
Completion of work |
-
latitude : 24.1350626,24.13516344
Longitude : 88.68811458,88.68797134
file name : Image_24022021191206893.png
|
2021-02-24 19:12:06.948881 |
57 |
47490317 |
Construction of PCC road from Jalangi GP Office towards Jalangi Health Sub Cente |
150000 |
Construction of PCC road from Jalangi GP Office towards Jalangi Health Sub Cente1 |
Roof laid |
-
latitude : 24.1275131,24.1275298
Longitude : 88.6897866,88.6898106
file name : Image_29052023134352662.png
|
2023-05-29 13:43:52.742617 |
58 |
47490317 |
Construction of PCC road from Jalangi GP Office towards Jalangi Health Sub Cente |
150000 |
Construction of PCC road from Jalangi GP Office towards Jalangi Health Sub Cente1 |
Completion of work |
-
latitude : 24.1276368,24.1276247
Longitude : 88.6897755,88.6897878
file name : Image_14032022150639145.png
|
2022-03-14 15:06:39.233018 |
59 |
47485837 |
Construction of PCC road from the house of Samsuddin towards the house of Sentu at Joykrishnapur |
180000 |
Construction of PCC road from the house of Samsuddin towards the house of Sentu at Joykrishnapur1 |
Completion of work |
-
latitude : 24.1276805,24.1276805
Longitude : 88.6875687,88.6875687
file name : Image_27022023170455844.png
|
2023-02-27 17:04:55.950101 |
60 |
47485837 |
Construction of PCC road from the house of Samsuddin towards the house of Sentu at Joykrishnapur |
180000 |
Construction of PCC road from the house of Samsuddin towards the house of Sentu at Joykrishnapur1 |
Completion of work |
-
latitude : 24.127678,24.127678
Longitude : 88.6876031,88.6876031
file name : Image_27022023170535836.png
|
2023-02-27 17:05:35.939719 |
61 |
47490639 |
Construction of separate Toilet & bathroom at Jalangi GP office |
200000 |
Construction of separate Toilet & bathroom at Jalangi GP office1 |
Plinth level |
-
latitude : 24.1274559
Longitude : 88.6897407
file name : Image_29052023135742644.png
|
2023-05-29 13:57:42.738892 |
62 |
47490639 |
Construction of separate Toilet & bathroom at Jalangi GP office |
200000 |
Construction of separate Toilet & bathroom at Jalangi GP office1 |
Roof laid |
-
latitude : 24.1274843
Longitude : 88.689743
file name : Image_29052023141536525.png
|
2023-05-29 14:15:36.622625 |
63 |
47490639 |
Construction of separate Toilet & bathroom at Jalangi GP office |
200000 |
Construction of separate Toilet & bathroom at Jalangi GP office1 |
Completion of work |
-
latitude : 24.1274435
Longitude : 88.6896893
file name : Image_14032022150806751.png
|
2022-03-14 15:08:06.843778 |
64 |
34860841 |
Construction of PCC road from the house of Pradip Pramanik |
175000 |
Construction of PCC road from the house of Pradip Pramanik 1 |
Roof laid |
-
latitude : 24.12830776,24.12829839
Longitude : 88.69114997,88.6911666
file name : Image_29052023142703077.png
|
2023-05-29 14:27:03.16783 |
65 |
34860841 |
Construction of PCC road from the house of Pradip Pramanik |
175000 |
Construction of PCC road from the house of Pradip Pramanik 1 |
Plinth level |
-
latitude : 24.12836708,24.1283692
Longitude : 88.69100472,88.69101215
file name : Image_29052023142530850.png
|
2023-05-29 14:25:30.952136 |
66 |
34860841 |
Construction of PCC road from the house of Pradip Pramanik |
175000 |
Construction of PCC road from the house of Pradip Pramanik 1 |
Completion of work |
-
latitude : 24.12841139,24.12839734
Longitude : 88.69106231,88.69105219
file name : Image_13092021131234503.png
|
2021-09-13 13:12:34.604703 |
67 |
34804729 |
Construction of PCC road from the house of Tota Bibi |
185311 |
Construction of PCC road from the house of Tota Bibi 1 |
Plinth level |
-
latitude : 24.1271495,24.1271426
Longitude : 88.6874597,88.687465
file name : Image_31052023151402581.png
|
2023-05-31 15:14:02.689676 |
68 |
34804729 |
Construction of PCC road from the house of Tota Bibi |
185311 |
Construction of PCC road from the house of Tota Bibi 1 |
Plinth level |
-
latitude : 24.12767774,24.12764089
Longitude : 88.68708192,88.68705425
file name : Image_31052023150713669.png
|
2023-05-31 15:07:13.776307 |
69 |
34804729 |
Construction of PCC road from the house of Tota Bibi |
185311 |
Construction of PCC road from the house of Tota Bibi 1 |
Completion of work |
-
latitude : 24.1290939,24.12930453
Longitude : 88.68641856,88.68647554
file name : Image_15012021140815549.png
|
2021-01-15 14:08:15.598625 |
70 |
56489304 |
Construction of PCC road from the house of Abdul Mandal towards the house of Islam Mandal at Gouripu |
125000 |
Construction of PCC road from the house of Abdul Mandal towards the house of Islam Mandal at Gouripu1 |
Plinth level |
-
latitude : 24.1350919,24.13512437
Longitude : 88.6894434,88.68942559
file name : Image_01062023142304656.png
|
2023-06-01 14:23:04.795729 |
71 |
56489304 |
Construction of PCC road from the house of Abdul Mandal towards the house of Islam Mandal at Gouripu |
125000 |
Construction of PCC road from the house of Abdul Mandal towards the house of Islam Mandal at Gouripu1 |
Plinth level |
-
latitude : 24.13509279,24.13509425
Longitude : 88.68940635,88.68940742
file name : Image_01062023141814556.png
|
2023-06-01 14:18:14.685941 |
72 |
56489304 |
Construction of PCC road from the house of Abdul Mandal towards the house of Islam Mandal at Gouripu |
125000 |
Construction of PCC road from the house of Abdul Mandal towards the house of Islam Mandal at Gouripu1 |
Plinth level |
-
latitude : 24.13512923,24.13513324,24.13513285
Longitude : 88.68933522,88.68932245,88.68932414
file name : Image_01062023141810520.png
|
2023-06-01 14:18:10.65891 |
73 |
56489304 |
Construction of PCC road from the house of Abdul Mandal towards the house of Islam Mandal at Gouripu |
125000 |
Construction of PCC road from the house of Abdul Mandal towards the house of Islam Mandal at Gouripu1 |
Completion of work |
-
latitude : 24.13502176,24.1350227
Longitude : 88.68941195,88.68941391
file name : Image_10012022134829973.png
|
2022-01-10 13:48:30.109287 |
74 |
56516896 |
installation of solar light infront of the house of provas haldar at joykrishnapur |
84000 |
installation of solar light infront of the house of provas haldar at joykrishnapur 1 |
Roof laid |
-
latitude : 24.12771999
Longitude : 88.69108456
file name : Image_02062023143632869.png
|
2023-06-02 14:36:32.987504 |
75 |
56516896 |
installation of solar light infront of the house of provas haldar at joykrishnapur |
84000 |
installation of solar light infront of the house of provas haldar at joykrishnapur 1 |
Plinth level |
-
latitude : 24.1276943
Longitude : 88.6910974
file name : Image_02062023142433436.png
|
2023-06-02 14:24:33.590525 |
76 |
56516896 |
installation of solar light infront of the house of provas haldar at joykrishnapur |
84000 |
installation of solar light infront of the house of provas haldar at joykrishnapur 1 |
Completion of work |
-
latitude : 24.1275011
Longitude : 88.6906068
file name : Image_27022023170811079.png
|
2023-02-27 17:08:11.258622 |
77 |
34804122 |
Installation of Sajaldhara infront of Viku Halsana |
800000 |
Installation of Sajaldhara infront of Viku Halsana 1 |
Roof laid |
-
latitude : 24.13504992
Longitude : 88.68974495
file name : Image_01062023123914588.png
|
2023-06-01 12:39:14.719553 |
78 |
34804122 |
Installation of Sajaldhara infront of Viku Halsana |
800000 |
Installation of Sajaldhara infront of Viku Halsana 1 |
Plinth level |
-
latitude : 24.13504043
Longitude : 88.68973236
file name : Image_31052023151934343.png
|
2023-05-31 15:19:34.437257 |
79 |
34804122 |
Installation of Sajaldhara infront of Viku Halsana |
800000 |
Installation of Sajaldhara infront of Viku Halsana 1 |
Completion of work |
-
latitude : 24.13504306
Longitude : 88.68975476
file name : Image_10012022135106546.png
|
2022-01-10 13:51:06.668496 |
80 |
39126327 |
Installation of Sajaldhara with Solar beside the house of Sukhen Das at Daspara |
800000 |
Installation of Sajaldhara with Solar beside the house of Sukhen Das at Daspara1 |
Plinth level |
-
latitude : 24.12909035
Longitude : 88.6862563
file name : Image_31052023144736642.png
|
2023-05-31 14:47:36.736825 |
81 |
39126327 |
Installation of Sajaldhara with Solar beside the house of Sukhen Das at Daspara |
800000 |
Installation of Sajaldhara with Solar beside the house of Sukhen Das at Daspara1 |
Plinth level |
-
latitude : 24.12904876
Longitude : 88.68634851
file name : Image_31052023144547262.png
|
2023-05-31 14:45:47.365908 |
82 |
39126327 |
Installation of Sajaldhara with Solar beside the house of Sukhen Das at Daspara |
800000 |
Installation of Sajaldhara with Solar beside the house of Sukhen Das at Daspara1 |
Completion of work |
-
latitude : 24.12907188
Longitude : 88.68624343
file name : Image_10012022140830587.png
|
2022-01-10 14:08:30.686536 |
83 |
34806011 |
Construction of PCC road from the house of Pintu Sk |
108249 |
Construction of PCC road from the house of Pintu Sk1 |
Plinth level |
-
latitude : 24.12884221,24.12883412
Longitude : 88.68662431,88.6866241
file name : Image_31052023150709035.png
|
2023-05-31 15:07:09.136374 |
84 |
34806011 |
Construction of PCC road from the house of Pintu Sk |
108249 |
Construction of PCC road from the house of Pintu Sk1 |
Plinth level |
-
latitude : 24.12884468,24.12883242
Longitude : 88.68659048,88.68658278
file name : Image_31052023150705169.png
|
2023-05-31 15:07:05.284562 |
85 |
34806011 |
Construction of PCC road from the house of Pintu Sk |
108249 |
Construction of PCC road from the house of Pintu Sk1 |
Completion of work |
-
latitude : 24.12901885,24.12901936
Longitude : 88.68657198,88.68657163
file name : Image_22092021123447710.png
|
2021-09-22 12:34:47.843241 |
86 |
34740430 |
Construction of PCC road from Najrul Smriti Sangha |
343978 |
Construction of PCC road from Najrul Smriti Sangha 1 |
Roof laid |
-
latitude : 24.1408138,24.1408138
Longitude : 88.6928314,88.6928314
file name : Image_01062023140011232.png
|
2023-06-01 14:00:11.354911 |
87 |
34740430 |
Construction of PCC road from Najrul Smriti Sangha |
343978 |
Construction of PCC road from Najrul Smriti Sangha 1 |
Plinth level |
-
latitude : 24.1408138,24.1408138
Longitude : 88.6928314,88.6928314
file name : Image_01062023135535611.png
|
2023-06-01 13:55:35.721739 |
88 |
34740430 |
Construction of PCC road from Najrul Smriti Sangha |
343978 |
Construction of PCC road from Najrul Smriti Sangha 1 |
Completion of work |
-
latitude : 24.14082725,24.14082106
Longitude : 88.69324086,88.69315372
file name : Image_14012021134505598.png
|
2021-01-14 13:45:05.670151 |
89 |
47488365 |
Upgadation , moderation & beautification of GP building at Jalangi GP |
637163 |
Upgadation , moderation & beautification of GP building at Jalangi GP1 |
Roof laid |
-
latitude : 24.1275653
Longitude : 88.6897626
file name : Image_05062023142615460.png
|
2023-06-05 14:26:15.553245 |
90 |
47488365 |
Upgadation , moderation & beautification of GP building at Jalangi GP |
637163 |
Upgadation , moderation & beautification of GP building at Jalangi GP1 |
Plinth level |
-
latitude : 24.1276026
Longitude : 88.6897591
file name : Image_02062023154754154.png
|
2023-06-02 15:47:54.238064 |
91 |
47488365 |
Upgadation , moderation & beautification of GP building at Jalangi GP |
637163 |
Upgadation , moderation & beautification of GP building at Jalangi GP1 |
Completion of work |
-
latitude : 24.1274721
Longitude : 88.6897004
file name : Image_14032022150913670.png
|
2022-03-14 15:09:13.768364 |
92 |
56514022 |
Construction of toilet at Gouripur Mondal para |
250000 |
Construction of toilet at Gouripur Mondal para 1 |
Roof laid |
-
latitude : 24.13341261
Longitude : 88.68902019
file name : Image_01062023143410338.png
|
2023-06-01 14:34:10.465789 |
93 |
56514022 |
Construction of toilet at Gouripur Mondal para |
250000 |
Construction of toilet at Gouripur Mondal para 1 |
Plinth level |
-
latitude : 24.13340059
Longitude : 88.68903702
file name : Image_01062023142707322.png
|
2023-06-01 14:27:07.449311 |
94 |
56514022 |
Construction of toilet at Gouripur Mondal para |
250000 |
Construction of toilet at Gouripur Mondal para 1 |
Completion of work |
-
latitude : 24.1333951
Longitude : 88.68898908
file name : Image_10052023131322663.png
|
2023-05-10 13:13:22.759716 |
95 |
56502333 |
construction of toilet at gouripur karbala |
250000 |
construction of toilet at gouripur karbala1 |
Roof laid |
-
latitude : 24.132234
Longitude : 88.6848921
file name : Image_01062023145816877.png
|
2023-06-01 14:58:17.053944 |
96 |
56502333 |
construction of toilet at gouripur karbala |
250000 |
construction of toilet at gouripur karbala1 |
Plinth level |
-
latitude : 24.1322345
Longitude : 88.6848815
file name : Image_01062023145125605.png
|
2023-06-01 14:51:25.74472 |
97 |
56502333 |
construction of toilet at gouripur karbala |
250000 |
construction of toilet at gouripur karbala1 |
Completion of work |
-
latitude : 24.1311524
Longitude : 88.686876
file name : Image_10052023131335891.png
|
2023-05-10 13:13:35.995015 |
98 |
56502333 |
construction of toilet at gouripur karbala |
250000 |
construction of toilet at gouripur karbala1 |
Completion of work |
-
latitude : 24.1311524
Longitude : 88.686876
file name : Image_10052023131325835.png
|
2023-05-10 13:13:25.937511 |
99 |
34776656 |
Construction of PCC road from the house of Punka Bewa |
221246 |
Construction of PCC road from the house of Punka Bewa 1 |
Roof laid |
-
latitude : 24.13317749,24.13317357
Longitude : 88.68546353,88.68552294
file name : Image_01062023144553748.png
|
2023-06-01 14:45:53.888482 |
100 |
34776656 |
Construction of PCC road from the house of Punka Bewa |
221246 |
Construction of PCC road from the house of Punka Bewa 1 |
Plinth level |
-
latitude : 24.13318265,24.13318075
Longitude : 88.68549894,88.68554252
file name : Image_01062023144009918.png
|
2023-06-01 14:40:10.074677 |
101 |
34776656 |
Construction of PCC road from the house of Punka Bewa |
221246 |
Construction of PCC road from the house of Punka Bewa 1 |
Completion of work |
-
latitude : 24.13314882,24.13310653
Longitude : 88.68559641,88.68579916
file name : Image_15012021134834080.png
|
2021-01-15 13:48:34.166161 |
102 |
34780268 |
Construction of PCC road from the house of Gopal Singha |
159463 |
Construction of PCC road from the house of Gopal Singha 1 |
Roof laid |
-
latitude : 24.14024469,24.14020915
Longitude : 88.67939201,88.6794094
file name : Image_01062023154208387.png
|
2023-06-01 15:42:08.518938 |
103 |
34780268 |
Construction of PCC road from the house of Gopal Singha |
159463 |
Construction of PCC road from the house of Gopal Singha 1 |
Plinth level |
-
latitude : 24.14025696,24.14027066
Longitude : 88.67941318,88.67945168
file name : Image_01062023153423737.png
|
2023-06-01 15:34:23.884542 |
104 |
34780268 |
Construction of PCC road from the house of Gopal Singha |
159463 |
Construction of PCC road from the house of Gopal Singha 1 |
Completion of work |
-
latitude : 24.14011219,24.14024039
Longitude : 88.67939266,88.67944412
file name : Image_15012021135904504.png
|
2021-01-15 13:59:04.597813 |
105 |
39126326 |
Installation of Sajaldhara with Solar infront of Kali Mandir at Hukahara MSK para |
800000 |
Installation of Sajaldhara with Solar infront of Kali Mandir at Hukahara MSK para1 |
Roof laid |
-
latitude : 24.13400998
Longitude : 88.67389327
file name : Image_01062023155217669.png
|
2023-06-01 15:52:17.807665 |
106 |
39126326 |
Installation of Sajaldhara with Solar infront of Kali Mandir at Hukahara MSK para |
800000 |
Installation of Sajaldhara with Solar infront of Kali Mandir at Hukahara MSK para1 |
Completion of work |
-
latitude : 24.13402524
Longitude : 88.67389889
file name : Image_01062023154853033.png
|
2023-06-01 15:48:53.172708 |
107 |
39126326 |
Installation of Sajaldhara with Solar infront of Kali Mandir at Hukahara MSK para |
800000 |
Installation of Sajaldhara with Solar infront of Kali Mandir at Hukahara MSK para1 |
Completion of work |
-
latitude : 24.13399267
Longitude : 88.67379068
file name : Image_23032021153421597.png
|
2021-03-23 15:34:21.682912 |
108 |
56514461 |
Maintainence and repair of Sajaldhara under Jalangi GP |
200000 |
Maintainence and repair of Sajaldhara under Jalangi GP 1 |
Roof laid |
-
latitude : 24.13402541
Longitude : 88.673835
file name : Image_02062023125231315.png
|
2023-06-02 12:52:31.428502 |
109 |
56514461 |
Maintainence and repair of Sajaldhara under Jalangi GP |
200000 |
Maintainence and repair of Sajaldhara under Jalangi GP 1 |
Plinth level |
-
latitude : 24.1343429
Longitude : 88.6746643
file name : Image_01062023155532583.png
|
2023-06-01 15:55:32.748206 |
110 |
56514461 |
Maintainence and repair of Sajaldhara under Jalangi GP |
200000 |
Maintainence and repair of Sajaldhara under Jalangi GP 1 |
Completion of work |
-
latitude : 24.1275561
Longitude : 88.6897673
file name : Image_23052023131457353.png
|
2023-05-23 13:14:57.456842 |
111 |
56516963 |
installation of solar light infront of jalangi ghoshpara shib mandir |
100000 |
installation of solar light infront of jalangi ghoshpara shib mandir 1 |
Roof laid |
-
latitude : 24.12820465
Longitude : 88.69299422
file name : Image_02062023154251749.png
|
2023-06-02 15:42:51.842218 |
112 |
56516963 |
installation of solar light infront of jalangi ghoshpara shib mandir |
100000 |
installation of solar light infront of jalangi ghoshpara shib mandir 1 |
Plinth level |
-
latitude : 24.12813612
Longitude : 88.69300823
file name : Image_02062023143637618.png
|
2023-06-02 14:36:37.733701 |
113 |
56516963 |
installation of solar light infront of jalangi ghoshpara shib mandir |
100000 |
installation of solar light infront of jalangi ghoshpara shib mandir 1 |
Completion of work |
-
latitude : 24.12753324
Longitude : 88.68978709
file name : Image_26042023161538294.png
|
2023-04-26 16:15:38.39765 |
114 |
68539467 |
Installation of Solar Light at Langrar More Sansad No- VI |
100000 |
Installation of Solar Light at Langrar More Sansad No- VI 1 |
Completion of work |
-
latitude : 24.1276767
Longitude : 88.6915164
file name : Image_14062023184347643.png
|
2023-06-14 18:43:47.745679 |
115 |
68539501 |
Installation of Solar Light Joykrishnapur Jatin Master More Sansad- IX |
100000 |
Installation of Solar Light Joykrishnapur Jatin Master More Sansad- IX1 |
Completion of work |
-
latitude : 24.1296081
Longitude : 88.6913805
file name : Image_14062023184426969.png
|
2023-06-14 18:44:27.070636 |
116 |
68539501 |
Installation of Solar Light Joykrishnapur Jatin Master More Sansad- IX |
100000 |
Installation of Solar Light Joykrishnapur Jatin Master More Sansad- IX1 |
Completion of work |
-
latitude : 24.1296081
Longitude : 88.6913805
file name : Image_14062023184357629.png
|
2023-06-14 18:43:57.729531 |
117 |
68539481 |
Installation of Solar Light Joykrishnapur Radha Govinda Mandir Sansad- VIII |
100000 |
Installation of Solar Light Joykrishnapur Radha Govinda Mandir Sansad- VIII1 |
Completion of work |
-
latitude : 24.1277046
Longitude : 88.6915437
file name : Image_14062023184352325.png
|
2023-06-14 18:43:52.423779 |
118 |
68539517 |
Installation of Solar Light infron of Hukahara New Jame Masjid Sansad-VII |
100000 |
Installation of Solar Light infron of Hukahara New Jame Masjid Sansad-VII1 |
Completion of work |
-
latitude : 24.1296077
Longitude : 88.6913782
file name : Image_14062023184433207.png
|
2023-06-14 18:44:33.303637 |
119 |
68539517 |
Installation of Solar Light infron of Hukahara New Jame Masjid Sansad-VII |
100000 |
Installation of Solar Light infron of Hukahara New Jame Masjid Sansad-VII1 |
Completion of work |
-
latitude : 24.1296077
Longitude : 88.6913782
file name : Image_14062023184402807.png
|
2023-06-14 18:44:02.905193 |
120 |
68539531 |
Installation of Solar Light near Gouripur Rakkha Kali Mandir Sansad III |
100000 |
Installation of Solar Light near Gouripur Rakkha Kali Mandir Sansad III1 |
Completion of work |
-
latitude : 24.1296194
Longitude : 88.69137
file name : Image_14062023184440560.png
|
2023-06-14 18:44:40.678701 |
121 |
68539531 |
Installation of Solar Light near Gouripur Rakkha Kali Mandir Sansad III |
100000 |
Installation of Solar Light near Gouripur Rakkha Kali Mandir Sansad III1 |
Completion of work |
-
latitude : 24.1296194
Longitude : 88.69137
file name : Image_14062023184408712.png
|
2023-06-14 18:44:08.824895 |
122 |
68539548 |
Installation of Solar Light infront of Madhu Pal House at Joykrishnapur Sansad-IX |
100000 |
Installation of Solar Light infront of Madhu Pal House at Joykrishnapur Sansad-IX1 |
Completion of work |
-
latitude : 24.1296196
Longitude : 88.6913645
file name : Image_14062023184448650.png
|
2023-06-14 18:44:48.755734 |
123 |
68539548 |
Installation of Solar Light infront of Madhu Pal House at Joykrishnapur Sansad-IX |
100000 |
Installation of Solar Light infront of Madhu Pal House at Joykrishnapur Sansad-IX1 |
Completion of work |
-
latitude : 24.1296196
Longitude : 88.6913645
file name : Image_14062023184415894.png
|
2023-06-14 18:44:15.998698 |
124 |
68539782 |
Installation of Solar Light infront of Saylen Ghosh house at Joykrishnapur Sansad-IX |
100000 |
Installation of Solar Light infront of Saylen Ghosh house at Joykrishnapur Sansad-IX 1 |
Completion of work |
-
latitude : 24.1296169
Longitude : 88.6913665
file name : Image_14062023184456769.png
|
2023-06-14 18:44:56.869495 |
125 |
68539782 |
Installation of Solar Light infront of Saylen Ghosh house at Joykrishnapur Sansad-IX |
100000 |
Installation of Solar Light infront of Saylen Ghosh house at Joykrishnapur Sansad-IX 1 |
Completion of work |
-
latitude : 24.1296169
Longitude : 88.6913665
file name : Image_14062023184420467.png
|
2023-06-14 18:44:20.570552 |
126 |
68539713 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.1275602
Longitude : 88.6897812
file name : Image_14062023190439138.png
|
2023-06-14 19:04:39.242918 |
127 |
68539728 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.1275618
Longitude : 88.6897784
file name : Image_14062023190445515.png
|
2023-06-14 19:04:45.624017 |
128 |
68539728 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.1275618
Longitude : 88.6897784
file name : Image_14062023190442211.png
|
2023-06-14 19:04:42.312168 |
129 |
67576708 |
Construction of roads |
80000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.1275392,24.1275392
Longitude : 88.6897741,88.6897741
file name : Image_10012024174827282.png
|
2024-01-10 17:48:27.374955 |
130 |
67576708 |
Construction of roads |
80000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.1275385,24.1275385
Longitude : 88.689771,88.689771
file name : Image_10012024174636794.png
|
2024-01-10 17:46:36.879674 |
131 |
67576708 |
Construction of roads |
80000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.1277442,24.1277442
Longitude : 88.68847,88.68847
file name : Image_10012024173535015.png
|
2024-01-10 17:35:35.107236 |
132 |
56502243 |
repair and renovation of community toilet at jalangi bazar and fuc club |
75000 |
repair and renovation of community toilet at jalangi bazar and fuc club 1 |
Roof laid |
-
latitude : 24.1275386
Longitude : 88.6897826
file name : Image_18012024163714606.png
|
2024-01-18 16:37:14.700066 |
133 |
56502243 |
repair and renovation of community toilet at jalangi bazar and fuc club |
75000 |
repair and renovation of community toilet at jalangi bazar and fuc club 1 |
Plinth level |
-
latitude : 24.1275382
Longitude : 88.6897841
file name : Image_18012024163458077.png
|
2024-01-18 16:34:58.170776 |
134 |
56502243 |
repair and renovation of community toilet at jalangi bazar and fuc club |
75000 |
repair and renovation of community toilet at jalangi bazar and fuc club 1 |
Completion of work |
-
latitude : 24.1262529
Longitude : 88.6939759
file name : Image_18012024162117486.png
|
2024-01-18 16:21:17.588099 |
135 |
56502243 |
repair and renovation of community toilet at jalangi bazar and fuc club |
75000 |
repair and renovation of community toilet at jalangi bazar and fuc club 2 |
Roof laid |
-
latitude : 24.1275357
Longitude : 88.6897828
file name : Image_18012024163745474.png
|
2024-01-18 16:37:45.562861 |
136 |
56502243 |
repair and renovation of community toilet at jalangi bazar and fuc club |
75000 |
repair and renovation of community toilet at jalangi bazar and fuc club 2 |
Plinth level |
-
latitude : 24.1275398
Longitude : 88.6897831
file name : Image_18012024163533862.png
|
2024-01-18 16:35:33.961008 |
137 |
56502243 |
repair and renovation of community toilet at jalangi bazar and fuc club |
75000 |
repair and renovation of community toilet at jalangi bazar and fuc club 2 |
Plinth level |
-
latitude : 24.1275398
Longitude : 88.6897831
file name : Image_18012024163530397.png
|
2024-01-18 16:35:30.49201 |
138 |
56502243 |
repair and renovation of community toilet at jalangi bazar and fuc club |
75000 |
repair and renovation of community toilet at jalangi bazar and fuc club 2 |
Plinth level |
-
latitude : 24.1275398
Longitude : 88.6897831
file name : Image_18012024163527237.png
|
2024-01-18 16:35:27.333459 |
139 |
56502243 |
repair and renovation of community toilet at jalangi bazar and fuc club |
75000 |
repair and renovation of community toilet at jalangi bazar and fuc club 2 |
Completion of work |
-
latitude : 24.1262326
Longitude : 88.6939629
file name : Image_18012024162204948.png
|
2024-01-18 16:22:05.103682 |
140 |
56513945 |
Construction of Toilet at Joykrishnapur Muradpur |
300000 |
Construction of Toilet at Joykrishnapur Muradpur 1 |
Roof laid |
-
latitude : 24.1275439
Longitude : 88.689781
file name : Image_24012024173312861.png
|
2024-01-24 17:33:12.951039 |
141 |
56513945 |
Construction of Toilet at Joykrishnapur Muradpur |
300000 |
Construction of Toilet at Joykrishnapur Muradpur 1 |
Plinth level |
-
latitude : 24.1275331
Longitude : 88.6897837
file name : Image_24012024172930056.png
|
2024-01-24 17:29:30.137688 |
142 |
56513945 |
Construction of Toilet at Joykrishnapur Muradpur |
300000 |
Construction of Toilet at Joykrishnapur Muradpur 1 |
Completion of work |
-
latitude : 24.1277798
Longitude : 88.6897249
file name : Image_24012024170918994.png
|
2024-01-24 17:09:19.092877 |
143 |
67577915 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Roof laid |
-
latitude : 24.13058439
Longitude : 88.68867062
file name : Image_21112023192532657.png
|
2023-11-21 19:25:32.74112 |
144 |
67577915 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Plinth level |
-
latitude : 24.13057393
Longitude : 88.68868036
file name : Image_21112023190415438.png
|
2023-11-21 19:04:15.521616 |
145 |
67577915 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Completion of work |
-
latitude : 24.1312642
Longitude : 88.6867945
file name : Image_21112023181103135.png
|
2023-11-21 18:11:03.223869 |
146 |
67578787 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Roof laid |
-
latitude : 24.1295961
Longitude : 88.6913879
file name : Image_21112023192711293.png
|
2023-11-21 19:27:11.382361 |
147 |
67578787 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Plinth level |
-
latitude : 24.12974364
Longitude : 88.69098387
file name : Image_21112023190602486.png
|
2023-11-21 19:06:02.563854 |
148 |
67578787 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Completion of work |
-
latitude : 24.12973515
Longitude : 88.69097786
file name : Image_21112023181350362.png
|
2023-11-21 18:13:50.451448 |
149 |
67578099 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Roof laid |
-
latitude : 24.1311551
Longitude : 88.6864349
file name : Image_21112023192440789.png
|
2023-11-21 19:24:40.898925 |
150 |
67578099 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Plinth level |
-
latitude : 24.1307447
Longitude : 88.68822296
file name : Image_21112023190315046.png
|
2023-11-21 19:03:15.141105 |
151 |
67578099 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Completion of work |
-
latitude : 24.13083449
Longitude : 88.68800961
file name : Image_21112023181219018.png
|
2023-11-21 18:12:19.107585 |
152 |
67577574 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Roof laid |
-
latitude : 24.1312406
Longitude : 88.6862777
file name : Image_21112023192218235.png
|
2023-11-21 19:22:18.321083 |
153 |
67577574 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Plinth level |
-
latitude : 24.1299692
Longitude : 88.6895135
file name : Image_21112023185335412.png
|
2023-11-21 18:53:35.487332 |
154 |
67577574 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Completion of work |
-
latitude : 24.12762078
Longitude : 88.68987085
file name : Image_21112023180822666.png
|
2023-11-21 18:08:22.748678 |
155 |
67577796 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Roof laid |
-
latitude : 24.13147407
Longitude : 88.68575258
file name : Image_21112023192257050.png
|
2023-11-21 19:22:57.133375 |
156 |
67577796 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Plinth level |
-
latitude : 24.13144826889038
Longitude : 88.68595898151398
file name : Image_21112023185409301.png
|
2023-11-21 18:54:09.381528 |
157 |
67577796 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Completion of work |
-
latitude : 24.13145994
Longitude : 88.68573161
file name : Image_21112023180907716.png
|
2023-11-21 18:09:07.798504 |
158 |
67578346 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Roof laid |
-
latitude : 24.129768
Longitude : 88.69069714
file name : Image_21112023192637442.png
|
2023-11-21 19:26:37.526052 |
159 |
67578346 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Plinth level |
-
latitude : 24.13011
Longitude : 88.6898583
file name : Image_21112023190500216.png
|
2023-11-21 19:05:00.297874 |
160 |
67578346 |
Installation of Solar Power Installation |
100000 |
Installation of Solar Power Installation1 |
Completion of work |
-
latitude : 24.1300383
Longitude : 88.6899793
file name : Image_21112023181321004.png
|
2023-11-21 18:13:21.092587 |
161 |
67620552 |
Operation and Maintenance of drinking water supply system |
300000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 24.127586
Longitude : 88.689787
file name : Image_30112023164757902.png
|
2023-11-30 16:47:58.000385 |
162 |
67620552 |
Operation and Maintenance of drinking water supply system |
300000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 24.1276015
Longitude : 88.6897845
file name : Image_30112023164617292.png
|
2023-11-30 16:46:17.389649 |
163 |
67620552 |
Operation and Maintenance of drinking water supply system |
300000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.1276129
Longitude : 88.6897834
file name : Image_30112023164449927.png
|
2023-11-30 16:44:50.025702 |
164 |
68539677 |
Operation & maintenance of drinking water supply system |
100000 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 24.14101345
Longitude : 88.69265524
file name : Image_30112023162737598.png
|
2023-11-30 16:27:37.689374 |
165 |
68539677 |
Operation & maintenance of drinking water supply system |
100000 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 24.14098388
Longitude : 88.69265389
file name : Image_30112023162107337.png
|
2023-11-30 16:21:07.444594 |
166 |
68539677 |
Operation & maintenance of drinking water supply system |
100000 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 24.14098388
Longitude : 88.69265389
file name : Image_30112023161403606.png
|
2023-11-30 16:14:03.707323 |
167 |
68539677 |
Operation & maintenance of drinking water supply system |
100000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.14099021
Longitude : 88.69266627
file name : Image_30112023160531597.png
|
2023-11-30 16:05:31.717546 |
168 |
68539699 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 24.1275747
Longitude : 88.689787
file name : Image_30112023164405293.png
|
2023-11-30 16:44:05.385006 |
169 |
68539699 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 24.1275462
Longitude : 88.6897859
file name : Image_30112023164203303.png
|
2023-11-30 16:42:03.419885 |
170 |
68539699 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.1275294
Longitude : 88.6897858
file name : Image_30112023163935578.png
|
2023-11-30 16:39:35.71668 |
171 |
67698322 |
Computer in GP Bhawan |
420000 |
Computer in GP Bhawan1 |
Roof laid |
-
latitude : 24.1275472
Longitude : 88.6897651
file name : Image_27122023171944302.png
|
2023-12-27 17:19:44.393181 |
172 |
67698322 |
Computer in GP Bhawan |
420000 |
Computer in GP Bhawan1 |
Plinth level |
-
latitude : 24.1275426
Longitude : 88.6897646
file name : Image_27122023171205337.png
|
2023-12-27 17:12:05.425964 |
173 |
67698322 |
Computer in GP Bhawan |
420000 |
Computer in GP Bhawan1 |
Completion of work |
-
latitude : 24.1275416
Longitude : 88.6897658
file name : Image_27122023170258373.png
|
2023-12-27 17:02:58.470166 |
174 |
68556819 |
Construction of toilets in public institutions |
590000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 24.1275469
Longitude : 88.6897746
file name : Image_23022024174448187.png
|
2024-02-23 17:44:48.270816 |
175 |
68556819 |
Construction of toilets in public institutions |
590000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 24.1275469
Longitude : 88.6897697
file name : Image_23022024174256474.png
|
2024-02-23 17:42:56.562059 |
176 |
68556819 |
Construction of toilets in public institutions |
590000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.1296957
Longitude : 88.6876185
file name : Image_23022024173446009.png
|
2024-02-23 17:34:46.338926 |
177 |
68556819 |
Construction of toilets in public institutions |
590000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.1296904
Longitude : 88.6876205
file name : Image_23022024173317702.png
|
2024-02-23 17:33:17.863725 |
178 |
68556819 |
Construction of toilets in public institutions |
590000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.1296904
Longitude : 88.6876205
file name : Image_23022024173306401.png
|
2024-02-23 17:33:06.551322 |
179 |
68556819 |
Construction of toilets in public institutions |
590000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.1296904
Longitude : 88.6876205
file name : Image_23022024173258458.png
|
2024-02-23 17:32:58.670331 |
180 |
67878279 |
Creation of other water recharging structure |
600000 |
Creation of other water recharging structure1 |
Roof laid |
-
latitude : 24.1275217
Longitude : 88.6897768
file name : Image_11072024171343986.png
|
2024-07-11 17:13:44.087579 |
181 |
67878279 |
Creation of other water recharging structure |
600000 |
Creation of other water recharging structure1 |
Plinth level |
-
latitude : 24.1275195
Longitude : 88.6897782
file name : Image_11072024170924036.png
|
2024-07-11 17:09:24.136958 |
182 |
67878279 |
Creation of other water recharging structure |
600000 |
Creation of other water recharging structure1 |
Completion of work |
-
latitude : 24.127524
Longitude : 88.6897744
file name : Image_11072024170408024.png
|
2024-07-11 17:04:08.122789 |
183 |
67878619 |
Creation of other water recharging structure |
600000 |
Creation of other water recharging structure1 |
Roof laid |
-
latitude : 24.127516
Longitude : 88.6897633
file name : Image_11072024171417173.png
|
2024-07-11 17:14:17.277355 |
184 |
67878619 |
Creation of other water recharging structure |
600000 |
Creation of other water recharging structure1 |
Plinth level |
-
latitude : 24.1275218
Longitude : 88.6897739
file name : Image_11072024171007136.png
|
2024-07-11 17:10:07.231459 |
185 |
67878619 |
Creation of other water recharging structure |
600000 |
Creation of other water recharging structure1 |
Completion of work |
-
latitude : 24.1275141
Longitude : 88.6897868
file name : Image_11072024170444955.png
|
2024-07-11 17:04:45.04298 |
186 |
89185151 |
Procurement of Computer Printer, UPS, etc. |
300000 |
Procurement of Computer Printer, UPS, etc.1 |
|
-
latitude : 24.1275243
Longitude : 88.6898033
file name : Image_04102024180622037.png
|
2024-10-04 18:06:21.369202 |
187 |
89185609 |
Internet Connection in Gram Panchayat Bhawan |
100000 |
Internet Connection in Gram Panchayat Bhawan1 |
|
-
latitude : 24.1275243
Longitude : 88.6898011
file name : Image_04102024180700883.png
|
2024-10-04 18:07:00.859367 |
188 |
89189850 |
Operation and Maintenance of drinking/piped water supply system |
500000 |
Operation and Maintenance of drinking/piped water supply system1 |
Roof laid |
-
latitude : 24.12742
Longitude : 88.6897677
file name : Image_26102024193338678.png
|
2024-10-26 19:33:38.850841 |
189 |
89189850 |
Operation and Maintenance of drinking/piped water supply system |
500000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 24.1274189
Longitude : 88.6897685
file name : Image_26102024193127264.png
|
2024-10-26 19:31:27.346343 |
190 |
89189850 |
Operation and Maintenance of drinking/piped water supply system |
500000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 24.1274187
Longitude : 88.6897678
file name : Image_26102024192920583.png
|
2024-10-26 19:29:20.701145 |
191 |
89184876 |
Installation of Solar lights |
420000 |
Installation of Solar lights1 |
Roof laid |
-
latitude : 24.1275228
Longitude : 88.6897927
file name : Image_12082024172325615.png
|
2024-08-12 17:23:25.703008 |
192 |
89184876 |
Installation of Solar lights |
420000 |
Installation of Solar lights1 |
Roof laid |
-
latitude : 24.1275228
Longitude : 88.6897927
file name : Image_12082024170709914.png
|
2024-08-12 17:07:10.001911 |
193 |
89184876 |
Installation of Solar lights |
420000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 24.127515
Longitude : 88.689792
file name : Image_12082024170427666.png
|
2024-08-12 17:04:27.765949 |
194 |
89184876 |
Installation of Solar lights |
420000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 24.1275062
Longitude : 88.6897822
file name : Image_12082024165920706.png
|
2024-08-12 16:59:20.8209 |
195 |
89192037 |
Construction of toilets in public institutions |
320000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 24.1275121
Longitude : 88.6897922
file name : Image_30102024195719838.png
|
2024-10-30 19:57:19.93357 |
196 |
89192037 |
Construction of toilets in public institutions |
320000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 24.1275173
Longitude : 88.6897922
file name : Image_30102024195358059.png
|
2024-10-30 19:53:58.156871 |
197 |
89192037 |
Construction of toilets in public institutions |
320000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.1275195
Longitude : 88.6898063
file name : Image_30102024195121930.png
|
2024-10-30 19:51:22.024873 |
198 |
89186471 |
Maintenance/ Upgradation of Gram Panchayat Bhawan |
300000 |
Maintenance/ Upgradation of Gram Panchayat Bhawan1 |
Roof laid |
-
latitude : 24.1275169
Longitude : 88.6898006
file name : Image_23112024161707532.png
|
2024-11-23 16:17:07.657695 |
199 |
89186471 |
Maintenance/ Upgradation of Gram Panchayat Bhawan |
300000 |
Maintenance/ Upgradation of Gram Panchayat Bhawan1 |
Plinth level |
-
latitude : 24.1275302
Longitude : 88.6898014
file name : Image_23112024161441620.png
|
2024-11-23 16:14:41.714294 |
200 |
89186471 |
Maintenance/ Upgradation of Gram Panchayat Bhawan |
300000 |
Maintenance/ Upgradation of Gram Panchayat Bhawan1 |
Completion of work |
-
latitude : 24.127526
Longitude : 88.6898024
file name : Image_23112024161251553.png
|
2024-11-23 16:12:51.636893 |
201 |
89197527 |
Pipeline connection for water supply |
1000000 |
Pipeline connection for water supply1 |
Roof laid |
-
latitude : 24.127526879310608
Longitude : 88.68979454040527
file name : Image_23112024163030887.png
|
2024-11-23 16:30:30.995917 |
202 |
89197527 |
Pipeline connection for water supply |
1000000 |
Pipeline connection for water supply1 |
Plinth level |
-
latitude : 24.1275286
Longitude : 88.6897901
file name : Image_23112024162855467.png
|
2024-11-23 16:28:55.562056 |
203 |
89197527 |
Pipeline connection for water supply |
1000000 |
Pipeline connection for water supply1 |
Completion of work |
-
latitude : 24.1275295
Longitude : 88.6898017
file name : Image_23112024162152963.png
|
2024-11-23 16:21:53.054616 |
204 |
89334985 |
Services of Collection & transportation of waste from household to treatment site |
300000 |
Services of Collection & transportation of waste from household to treatment site1 |
Completion of work |
-
latitude : 24.127526879310608
Longitude : 88.68978917598724
file name : Image_23112024174737466.png
|
2024-11-23 17:47:37.556636 |