1 |
34899698 |
Construction of Box culvert near Nabingram Laxmi Mandir at Khashmahal |
294427 |
Construction of Box culvert near Nabingram Laxmi Mandir at Khashmahal 1 |
Completion of work |
-
latitude : 24.232905758544803,24.232935095205903
Longitude : 88.70504532940686,88.70500551536679
file name : Image_15032021140758514.png
|
2021-03-15 14:07:58.571988 |
2 |
34743245 |
Construction of concrete road from Bellal Sk house to Chaharuddin |
500000 |
Construction of concrete road from Bellal Sk house to Chaharuddin 1 |
Plinth level |
-
latitude : 24.272471666666668,24.272471666666668
Longitude : 88.68944833333335,88.68944833333335
file name : Image_10092021150651121.png
|
2021-09-10 15:06:51.205391 |
3 |
34743245 |
Construction of concrete road from Bellal Sk house to Chaharuddin |
500000 |
Construction of concrete road from Bellal Sk house to Chaharuddin 1 |
Completion of work |
-
latitude : 24.272391666666667,24.272391666666667
Longitude : 88.68944000000002,88.68944000000002
file name : Image_19082021125731332.png
|
2021-08-19 12:57:31.435133 |
4 |
34899478 |
Construction of concrete road from choukider house to Abu Sayed house |
310000 |
Construction of concrete road from choukider house to Abu Sayed house 1 |
Plinth level |
-
latitude : 24.24683166666667,24.24683333333333
Longitude : 88.69706666666667,88.69706666666667
file name : Image_10092021150658832.png
|
2021-09-10 15:06:58.916682 |
5 |
34899478 |
Construction of concrete road from choukider house to Abu Sayed house |
310000 |
Construction of concrete road from choukider house to Abu Sayed house 1 |
Completion of work |
-
latitude : 24.246895000000002,24.24689166666667
Longitude : 88.69700499999999,88.69699833333334
file name : Image_13082021094832849.png
|
2021-08-13 09:48:32.951646 |
6 |
34907574 |
Construction of cc road from Sitanagar Primary School to Tujam Mandal house |
500000 |
Construction of cc road from Sitanagar Primary School to Tujam Mandal house 1 |
Plinth level |
-
latitude : 24.234890000000004,24.234890000000004
Longitude : 88.70466666666668,88.70466666666668
file name : Image_10092021150654871.png
|
2021-09-10 15:06:54.95846 |
7 |
34907574 |
Construction of cc road from Sitanagar Primary School to Tujam Mandal house |
500000 |
Construction of cc road from Sitanagar Primary School to Tujam Mandal house 1 |
Completion of work |
-
latitude : 24.23486666666667,24.234861666666667
Longitude : 88.70465166666666,88.70464666666666
file name : Image_19082021125737752.png
|
2021-08-19 12:57:37.856686 |
8 |
34878673 |
Construction of concrete road from Matiur Rahaman house to Asraf Sk house at Charkakmari |
750000 |
Construction of concrete road from Matiur Rahaman house to Asraf Sk house at Charkakmari1 |
Completion of work |
-
latitude : 24.26758333333333,24.26758333333333
Longitude : 88.71699500000001,88.71699500000001
file name : Image_19082021125734483.png
|
2021-08-19 12:57:34.592872 |
9 |
34878673 |
Construction of concrete road from Matiur Rahaman house to Asraf Sk house at Charkakmari |
750000 |
Construction of concrete road from Matiur Rahaman house to Asraf Sk house at Charkakmari1 |
Completion of work |
-
latitude : 24.26758166666667,24.26758166666667
Longitude : 88.71697833333334,88.71697833333334
file name : Image_13082021094827593.png
|
2021-08-13 09:48:27.70205 |
10 |
34897479 |
Construction of concrete road with Sal- Bolla piling from PWD road to Majrul Sk house |
358000 |
Construction of concrete road with Sal- Bolla piling from PWD road to Majrul Sk house 1 |
Plinth level |
-
latitude : 24.244641666666666,24.244636666666665
Longitude : 88.69178666666667,88.69179166666666
file name : Image_10092021150706154.png
|
2021-09-10 15:07:06.242636 |
11 |
34890714 |
Construction of community Toilet infront of Lalkup Madrasa |
350000 |
Construction of community Toilet infront of Lalkup Madrasa 1 |
Completion of work |
-
latitude : 24.27030666666667
Longitude : 88.68248333333334
file name : Image_10092021150643914.png
|
2021-09-10 15:06:44.02452 |
12 |
34884583 |
Construction of concrete road from PCC road to Kabarstan at Sahebnagar School |
275576 |
Construction of concrete road from PCC road to Kabarstan at Sahebnagar School 1 |
Completion of work |
-
latitude : 24.249057308770716,24.249090584926307
Longitude : 88.6916216276586,88.69167015887797
file name : Image_02032021142058565.png
|
2021-03-02 14:20:58.633117 |
13 |
34879773 |
Construction of concrete road from PWD road to MSK School at Charkakmari |
1068508 |
Construction of concrete road from PWD road to MSK School at Charkakmari1 |
Plinth level |
-
latitude : 24.255138333333335,24.255135000000003
Longitude : 88.71657333333333,88.71658000000001
file name : Image_30092021155218363.png
|
2021-09-30 15:52:18.468939 |
14 |
34879773 |
Construction of concrete road from PWD road to MSK School at Charkakmari |
1068508 |
Construction of concrete road from PWD road to MSK School at Charkakmari1 |
Completion of work |
-
latitude : 24.255131632089615,24.255120526067913
Longitude : 88.71658486314118,88.71658394113183
file name : Image_02032021142103369.png
|
2021-03-02 14:21:03.428688 |
15 |
34904298 |
Construction of concrete road from Abdul Bari Sarkar house to Surya Bibi house at Khayertala |
568690 |
Construction of concrete road from Abdul Bari Sarkar house to Surya Bibi house at Khayertala1 |
Completion of work |
-
latitude : 24.270834918133914,24.27081886678934
Longitude : 88.68236943148077,88.68241402320564
file name : Image_02032021142107647.png
|
2021-03-02 14:21:07.710635 |
16 |
34904298 |
Construction of concrete road from Abdul Bari Sarkar house to Surya Bibi house at Khayertala |
568690 |
Construction of concrete road from Abdul Bari Sarkar house to Surya Bibi house at Khayertala1 |
Completion of work |
-
latitude : 24.270783285610378,24.270786638371646
Longitude : 88.68236934766173,88.68236809037626
file name : Image_02032021142111926.png
|
2021-03-02 14:21:11.990567 |
17 |
34883418 |
Sal-Bollah piling from Sanjit Mandal house to Khoka Mondal house at Shirochar |
421547 |
Sal-Bollah piling from Sanjit Mandal house to Khoka Mondal house at Shirochar1 |
Completion of work |
-
latitude : 24.26006999798119,24.260056712664664
Longitude : 88.69262896478176,88.69263868778944
file name : Image_02032021143722379.png
|
2021-03-02 14:37:22.474695 |
18 |
34883418 |
Sal-Bollah piling from Sanjit Mandal house to Khoka Mondal house at Shirochar |
421547 |
Sal-Bollah piling from Sanjit Mandal house to Khoka Mondal house at Shirochar1 |
Completion of work |
-
latitude : 24.260030016303062,24.26003923639655
Longitude : 88.69265771470964,88.69264991953969
file name : Image_02032021143742779.png
|
2021-03-02 14:37:42.865767 |
19 |
34888299 |
Installation of water treatment plant (Sajal Dhara) at Ajahar Ali Biswas Land at Raipara(W) |
1400000 |
Installation of water treatment plant (Sajal Dhara) at Ajahar Ali Biswas Land at Raipara(W) 1 |
Completion of work |
-
latitude : 24.24923666666667
Longitude : 88.68569000000001
file name : Image_23122021120854511.png
|
2021-12-23 12:08:54.697029 |
20 |
34885461 |
Installation of water treatment plant Sajal Dhara at Khalek Sk Land |
1400000 |
Installation of water treatment plant Sajal Dhara at Khalek Sk Land 1 |
Plinth level |
-
latitude : 24.2489551
Longitude : 88.6892724
file name : Image_06032024164405930.png
|
2024-03-06 16:44:06.046815 |
21 |
34885461 |
Installation of water treatment plant Sajal Dhara at Khalek Sk Land |
1400000 |
Installation of water treatment plant Sajal Dhara at Khalek Sk Land 1 |
Completion of work |
-
latitude : 24.252246666666665
Longitude : 88.68978166666666
file name : Image_23112021131107053.png
|
2021-11-23 13:11:07.176584 |
22 |
39101220 |
Construction of water treatment plant sajal dhara infont of Mustakin sk house at charkakmari |
1400000 |
Construction of water treatment plant sajal dhara infont of Mustakin sk house at charkakmari 1 |
Completion of work |
-
latitude : 24.263206666666665
Longitude : 88.70957333333332
file name : Image_23112021131103363.png
|
2021-11-23 13:11:03.461376 |
23 |
34911828 |
Repairing of road by brick bats with silvar sand at all Sansad |
500000 |
Repairing of road by brick bats with silvar sand at all Sansad1 |
Completion of work |
-
latitude : 24.234783333333333,24.234786666666665
Longitude : 88.70122166666667,88.70123833333334
file name : Image_30092021155222690.png
|
2021-09-30 15:52:22.799966 |
24 |
34919705 |
Awareness Camp at Sahebnagar High School. |
600000 |
Awareness Camp at Sahebnagar High School.1 |
Completion of work |
-
latitude : 24.2501167
Longitude : 88.6893651
file name : Image_05102021141438484.png
|
2021-10-05 14:14:38.539593 |
25 |
34887217 |
Construction of cc road from PWD Bottala to BSF road at Raipar |
743384 |
Construction of cc road from PWD Bottala to BSF road at Raipar1 |
Completion of work |
-
latitude : 24.25423166666667,24.254311666666663
Longitude : 88.68530000000001,88.68524666666666
file name : Image_03022022131522494.png
|
2022-02-03 13:15:22.599066 |
26 |
48292514 |
Administrative cost of VBD |
800000 |
Administrative cost of VBD1 |
Completion of work |
-
latitude : 24.2490021
Longitude : 88.6892138
file name : Image_24022022162320802.png
|
2022-02-24 16:23:20.910998 |
27 |
34894619 |
Sal-Bollah Piling from Khayertala BSF road to Culvert at Raipara |
460000 |
Sal-Bollah Piling from Khayertala BSF road to Culvert at Raipara 1 |
Completion of work |
-
latitude : 24.25608833333333,24.25608833333333
Longitude : 88.68583333333332,88.68583333333332
file name : Image_03022022131542521.png
|
2022-02-03 13:15:42.614203 |
28 |
34894619 |
Sal-Bollah Piling from Khayertala BSF road to Culvert at Raipara |
460000 |
Sal-Bollah Piling from Khayertala BSF road to Culvert at Raipara 1 |
Completion of work |
-
latitude : 24.256169999999997,24.256169999999997,24.256168333333335
Longitude : 88.68573833333333,88.68573833333333,88.68574166666667
file name : Image_10122021135916517.png
|
2021-12-10 13:59:16.626009 |
29 |
47085088 |
Operation & maintanance of different type of road at all sansad under Sahebnagar GP. |
250000 |
Operation & maintanance of different type of road at all sansad under Sahebnagar GP.1 |
Completion of work |
-
latitude : 24.2470393,24.2470393
Longitude : 88.6905654,88.6905654
file name : Image_15032022152215403.png
|
2022-03-15 15:22:15.518257 |
30 |
46968209 |
Installation of water treatment plant at Mahasin Mondal land of Chourasta moor at Tiktikipara under |
1100000 |
Installation of water treatment plant at Mahasin Mondal land of Chourasta moor at Tiktikipara under1 |
Completion of work |
-
latitude : 24.272281173616648
Longitude : 88.68714669719338
file name : Image_06062022144628854.png
|
2022-06-06 14:46:28.954008 |
31 |
46970613 |
Upgradation of road by Stone boulder Pitching from Najimuddin Sk house to Kabatulla Biswas house at |
457056 |
Upgradation of road by Stone boulder Pitching from Najimuddin Sk house to Kabatulla Biswas house at1 |
Completion of work |
-
latitude : 24.250676,24.25004704389721
Longitude : 88.6854588,88.68378672748804
file name : Image_30062022134043328.png
|
2022-06-30 13:40:43.446398 |
32 |
46970094 |
Installation of water treatment plant infront of Tipu Sultan house at Sahebnagar under Sahebnagar G |
988463 |
Installation of water treatment plant infront of Tipu Sultan house at Sahebnagar under Sahebnagar G1 |
Plinth level |
-
latitude : 24.24957489129156
Longitude : 88.69117235764861
file name : Image_09112022144302826.png
|
2022-11-09 14:43:02.963922 |
33 |
46970094 |
Installation of water treatment plant infront of Tipu Sultan house at Sahebnagar under Sahebnagar G |
988463 |
Installation of water treatment plant infront of Tipu Sultan house at Sahebnagar under Sahebnagar G1 |
Completion of work |
-
latitude : 24.2495847819373
Longitude : 88.69121837429702
file name : Image_09112022143126669.png
|
2022-11-09 14:31:26.757766 |
34 |
46992346 |
Installation of water treatment plant at Raipara east Sansad under Sahebnagar GP . |
988463 |
Installation of water treatment plant at Raipara east Sansad under Sahebnagar GP .1 |
Plinth level |
-
latitude : 24.263973073102534
Longitude : 88.71611438691616
file name : Image_09122022144101142.png
|
2022-12-09 14:41:01.233001 |
35 |
46992346 |
Installation of water treatment plant at Raipara east Sansad under Sahebnagar GP . |
988463 |
Installation of water treatment plant at Raipara east Sansad under Sahebnagar GP .1 |
Completion of work |
-
latitude : 24.263940467499197
Longitude : 88.71613718569279
file name : Image_09122022143246382.png
|
2022-12-09 14:32:46.470826 |
36 |
46970857 |
Construction of concrete road from PWD road to Nekchar Sk house at Raipara East under Sahebnagar G. |
102488 |
Construction of concrete road from PWD road to Nekchar Sk house at Raipara East under Sahebnagar G.1 |
Plinth level |
-
latitude : 24.248710297979414,24.248711597174406,24.24863771069795
Longitude : 88.68859073147178,88.68859358131886,88.68835067376494
file name : Image_02032023151325925.png
|
2023-03-02 15:13:26.018129 |
37 |
46970857 |
Construction of concrete road from PWD road to Nekchar Sk house at Raipara East under Sahebnagar G. |
102488 |
Construction of concrete road from PWD road to Nekchar Sk house at Raipara East under Sahebnagar G.1 |
Completion of work |
-
latitude : 24.24879189580679,24.24879189580679
Longitude : 88.68851261213422,88.68851261213422
file name : Image_02032023150416966.png
|
2023-03-02 15:04:17.057136 |
38 |
46992542 |
Construction of concrete road from Alauddin Sk house to Amir Hamza Miya house at Sahebnagar GP boot |
219415 |
Construction of concrete road from Alauddin Sk house to Amir Hamza Miya house at Sahebnagar GP boot1 |
Plinth level |
-
latitude : 24.248561435379088,24.248605356551707
Longitude : 88.68779411539435,88.6877038422972
file name : Image_02032023151109430.png
|
2023-03-02 15:11:09.539522 |
39 |
46992542 |
Construction of concrete road from Alauddin Sk house to Amir Hamza Miya house at Sahebnagar GP boot |
219415 |
Construction of concrete road from Alauddin Sk house to Amir Hamza Miya house at Sahebnagar GP boot1 |
Completion of work |
-
latitude : 24.248644751496613,24.248627107590437
Longitude : 88.68766997940838,88.68759781122208
file name : Image_02032023150657378.png
|
2023-03-02 15:06:57.469828 |
40 |
56568846 |
Community Toilet of Giyas Mondal house at teen rasta mour at Tiktikipara Mouza-Sahebnagar SDG-6.2 |
300000 |
Community Toilet of Giyas Mondal house at teen rasta mour at Tiktikipara Mouza-Sahebnagar SDG-6.21 |
Plinth level |
-
latitude : 24.268420091830194
Longitude : 88.68475358001888
file name : Image_15062023131725875.png
|
2023-06-15 13:17:25.979514 |
41 |
56568846 |
Community Toilet of Giyas Mondal house at teen rasta mour at Tiktikipara Mouza-Sahebnagar SDG-6.2 |
300000 |
Community Toilet of Giyas Mondal house at teen rasta mour at Tiktikipara Mouza-Sahebnagar SDG-6.21 |
Plinth level |
-
latitude : 24.268444986082613
Longitude : 88.68471259251237
file name : Image_06062023163436582.png
|
2023-06-06 16:34:36.67878 |
42 |
46970270 |
Construction of concrete road from Rokon Moya house to Sahin Akter house at Raipara East under Sahe |
150000 |
Construction of concrete road from Rokon Moya house to Sahin Akter house at Raipara East under Sahe1 |
Plinth level |
-
latitude : 24.2532474,24.252593843266368
Longitude : 88.6821463,88.68209484033287
file name : Image_14032023144538306.png
|
2023-03-14 14:45:38.39307 |
43 |
46970270 |
Construction of concrete road from Rokon Moya house to Sahin Akter house at Raipara East under Sahe |
150000 |
Construction of concrete road from Rokon Moya house to Sahin Akter house at Raipara East under Sahe1 |
Completion of work |
-
latitude : 24.252629298716784,24.252586383372545
Longitude : 88.68208260275424,88.68204371072352
file name : Image_14032023144000336.png
|
2023-03-14 14:40:00.435061 |
44 |
46968790 |
Construction of concrete road from Mallik Sekh House to Primary School at Charkakmari(S) under Sahe |
300000 |
Construction of concrete road from Mallik Sekh House to Primary School at Charkakmari(S) under Sahe1 |
Plinth level |
-
latitude : 24.2579351272434,24.2579351272434
Longitude : 88.71676532551646,88.71676532551646
file name : Image_20042023160352592.png
|
2023-04-20 16:03:52.695501 |
45 |
46968790 |
Construction of concrete road from Mallik Sekh House to Primary School at Charkakmari(S) under Sahe |
300000 |
Construction of concrete road from Mallik Sekh House to Primary School at Charkakmari(S) under Sahe1 |
Plinth level |
-
latitude : 24.257947113364935,24.25795402843505
Longitude : 88.71675610542297,88.7167733721435
file name : Image_27032023132256123.png
|
2023-03-27 13:22:56.222594 |
46 |
56663511 |
water Testing Remunaration |
60000 |
water Testing Remunaration 1 |
Completion of work |
-
latitude : 24.248404777608812
Longitude : 88.68583283387125
file name : Image_14032023141906654.png
|
2023-03-14 14:19:06.748497 |
47 |
46992817 |
Construction of concrete road from Marjul house to Mojammel house at Ramakantapur under Sahebnagar |
300000 |
Construction of concrete road from Marjul house to Mojammel house at Ramakantapur under Sahebnagar 1 |
Plinth level |
-
latitude : 24.24462462309748,24.24462462309748
Longitude : 88.697421066463,88.697421066463
file name : Image_20032023143504782.png
|
2023-03-20 14:35:04.880846 |
48 |
46992817 |
Construction of concrete road from Marjul house to Mojammel house at Ramakantapur under Sahebnagar |
300000 |
Construction of concrete road from Marjul house to Mojammel house at Ramakantapur under Sahebnagar 1 |
Completion of work |
-
latitude : 24.244651654735208,24.244651654735208
Longitude : 88.69744361378253,88.69744361378253
file name : Image_20032023141652864.png
|
2023-03-20 14:16:52.96086 |
49 |
46993349 |
Construction of concrete road from Rabban Sekh house to Baki Sekh house at Sitanagar under Sahebnaga |
250000 |
Construction of concrete road from Rabban Sekh house to Baki Sekh house at Sitanagar under Sahebnaga1 |
Plinth level |
-
latitude : 24.233441152609885,24.233441152609885
Longitude : 88.70641585439444,88.70641585439444
file name : Image_20032023145312842.png
|
2023-03-20 14:53:12.937597 |
50 |
46993349 |
Construction of concrete road from Rabban Sekh house to Baki Sekh house at Sitanagar under Sahebnaga |
250000 |
Construction of concrete road from Rabban Sekh house to Baki Sekh house at Sitanagar under Sahebnaga1 |
Completion of work |
-
latitude : 24.233396141789854,24.233396141789854
Longitude : 88.7064802274108,88.7064802274108
file name : Image_20032023144545323.png
|
2023-03-20 14:45:45.403866 |
51 |
46968476 |
Construction of concrete road from Deldar Sekh House to Hamed Sekh House at Charkakmari(N) under Sa |
302935 |
Construction of concrete road from Deldar Sekh House to Hamed Sekh House at Charkakmari(N) under Sa1 |
Plinth level |
-
latitude : 24.267137870192528,24.267137870192528,24.267137870192528
Longitude : 88.71703086420894,88.71703086420894,88.71703086420894
file name : Image_27032023133735851.png
|
2023-03-27 13:37:35.945456 |
52 |
56564554 |
Repairing & Maintanance of different type of road at all sansad SDG-9.1 |
400000 |
Repairing & Maintanance of different type of road at all sansad SDG-9.11 |
Plinth level |
-
latitude : 24.256799463182688,24.25674380734563
Longitude : 88.71394934132695,88.71394598856568
file name : Image_22052023150735327.png
|
2023-05-22 15:07:35.425982 |
53 |
56564554 |
Repairing & Maintanance of different type of road at all sansad SDG-9.1 |
400000 |
Repairing & Maintanance of different type of road at all sansad SDG-9.11 |
Plinth level |
-
latitude : 24.25495280418545,24.25495280418545
Longitude : 88.71391849592328,88.71391849592328
file name : Image_22052023145543396.png
|
2023-05-22 14:55:43.500793 |
54 |
56564554 |
Repairing & Maintanance of different type of road at all sansad SDG-9.1 |
400000 |
Repairing & Maintanance of different type of road at all sansad SDG-9.11 |
Completion of work |
-
latitude : 24.253461454063654,24.253461454063654,24.25349862780422
Longitude : 88.71388966217637,88.71388966217637,88.71390952728689
file name : Image_22052023144935054.png
|
2023-05-22 14:49:35.179327 |
55 |
56662589 |
Construction of community Toilet infront of Radha Gobinda Mondir at Khasmahal |
300000 |
Construction of community Toilet infront of Radha Gobinda Mondir at Khasmahal 1 |
Plinth level |
-
latitude : 24.23422926105559
Longitude : 88.70983625762165
file name : Image_26052023141710654.png
|
2023-05-26 14:17:10.745564 |
56 |
56662589 |
Construction of community Toilet infront of Radha Gobinda Mondir at Khasmahal |
300000 |
Construction of community Toilet infront of Radha Gobinda Mondir at Khasmahal 1 |
Completion of work |
-
latitude : 24.234082871116698
Longitude : 88.71005033142865
file name : Image_26052023140123409.png
|
2023-05-26 14:01:23.496731 |
57 |
56662589 |
Construction of community Toilet infront of Radha Gobinda Mondir at Khasmahal |
300000 |
Construction of community Toilet infront of Radha Gobinda Mondir at Khasmahal 1 |
Completion of work |
-
latitude : 24.23404247034341
Longitude : 88.71010179631412
file name : Image_26052023140242155.png
|
2023-05-26 14:02:42.237899 |
58 |
67341608 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 24.2489715
Longitude : 88.6893865
file name : Image_26052023135927884.png
|
2023-05-26 13:59:27.982528 |
59 |
67341608 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.2489222
Longitude : 88.6892858
file name : Image_24052023162245869.png
|
2023-05-24 16:22:45.959601 |
60 |
67341608 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 24.2489572
Longitude : 88.6893634
file name : Image_24052023160948118.png
|
2023-05-24 16:09:48.227454 |
61 |
46969712 |
Installation of water treatment plant infront of Fani Mandal house at Shirochar under Sahebnagar GP |
1100000 |
Installation of water treatment plant infront of Fani Mandal house at Shirochar under Sahebnagar GP 1 |
Completion of work |
-
latitude : 24.256361089646816
Longitude : 88.69409428909421
file name : Image_06062022150600888.png
|
2022-06-06 15:06:00.974692 |
62 |
34888163 |
Construction of community Toilet infront of Dip Tubewell mour at Tiktikipara |
450000 |
Construction of community Toilet infront of Dip Tubewell mour at Tiktikipara1 |
Completion of work |
-
latitude : 24.2663
Longitude : 88.68409666666666
file name : Image_10092021150647596.png
|
2021-09-10 15:06:47.686384 |
63 |
34887105 |
Construction of community Toilet at Raipara Bottola mour at Raipara |
450000 |
Construction of community Toilet at Raipara Bottola mour at Raipara1 |
Roof laid |
-
latitude : 24.25541333333333
Longitude : 88.682695
file name : Image_03112021150421145.png
|
2021-11-03 15:04:21.256643 |
64 |
34887105 |
Construction of community Toilet at Raipara Bottola mour at Raipara |
450000 |
Construction of community Toilet at Raipara Bottola mour at Raipara1 |
Plinth level |
-
latitude : 24.255386666666663
Longitude : 88.68274333333332
file name : Image_10092021150640161.png
|
2021-09-10 15:06:40.25162 |
65 |
34887105 |
Construction of community Toilet at Raipara Bottola mour at Raipara |
450000 |
Construction of community Toilet at Raipara Bottola mour at Raipara1 |
Completion of work |
-
latitude : 24.255405000000003
Longitude : 88.68275333333334
file name : Image_19082021125724720.png
|
2021-08-19 12:57:24.853444 |
66 |
34887105 |
Construction of community Toilet at Raipara Bottola mour at Raipara |
450000 |
Construction of community Toilet at Raipara Bottola mour at Raipara1 |
Completion of work |
-
latitude : 24.255415000000003
Longitude : 88.68276666666667
file name : Image_19082021125728123.png
|
2021-08-19 12:57:28.229722 |
67 |
34910029 |
Construction of community Toilet infront of Debipur Mour at Ramakantapur |
300000 |
Construction of community Toilet infront of Debipur Mour at Ramakantapur 1 |
Plinth level |
-
latitude : 24.24262666666667
Longitude : 88.69259166666667
file name : Image_10092021150702582.png
|
2021-09-10 15:07:02.672558 |
68 |
34910029 |
Construction of community Toilet infront of Debipur Mour at Ramakantapur |
300000 |
Construction of community Toilet infront of Debipur Mour at Ramakantapur 1 |
Completion of work |
-
latitude : 24.2428567
Longitude : 88.6923631
file name : Image_17082021134827633.png
|
2021-08-17 13:48:27.745788 |
69 |
66025812 |
Construction of Community Sanitary Complex |
297474 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 24.249223270453513
Longitude : 88.69379002600908
file name : Image_09122022151153815.png
|
2022-12-09 15:11:53.903277 |
70 |
66025812 |
Construction of Community Sanitary Complex |
297474 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.249384747818112
Longitude : 88.69385406374931
file name : Image_08122022160926040.png
|
2022-12-08 16:09:26.13346 |
71 |
66025812 |
Construction of Community Sanitary Complex |
297474 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 24.249239112250507
Longitude : 88.69385741651058
file name : Image_08122022160930791.png
|
2022-12-08 16:09:30.876215 |
72 |
46992250 |
Construction of community Toilet infront of Raipara Masjid at Raipara east under Sahebnagar GP. |
297622 |
Construction of community Toilet infront of Raipara Masjid at Raipara east under Sahebnagar GP.1 |
Plinth level |
-
latitude : 24.248582180589437
Longitude : 88.68587390519679
file name : Image_14032023141752888.png
|
2023-03-14 14:17:52.998321 |
73 |
46992250 |
Construction of community Toilet infront of Raipara Masjid at Raipara east under Sahebnagar GP. |
297622 |
Construction of community Toilet infront of Raipara Masjid at Raipara east under Sahebnagar GP.1 |
Completion of work |
-
latitude : 24.248555777594447
Longitude : 88.68591757491231
file name : Image_14032023141220213.png
|
2023-03-14 14:12:20.313756 |
74 |
46993090 |
Installation of water treatment plant infront of Madina masjid at Nabingram under Sahebnagar GP . |
1100000 |
Installation of water treatment plant infront of Madina masjid at Nabingram under Sahebnagar GP .1 |
Completion of work |
-
latitude : 24.2360433
Longitude : 88.7023462
file name : Image_06062022151523765.png
|
2022-06-06 15:15:23.859939 |
75 |
56565847 |
development og GP office Boundery wall by colouring fencing at sahebnagar Gp office |
350000 |
development og GP office Boundery wall by colouring fencing at sahebnagar Gp office 1 |
Plinth level |
-
latitude : 24.2489791
Longitude : 88.6892549
file name : Image_22062023140229347.png
|
2023-06-22 14:02:29.439689 |
76 |
56565847 |
development og GP office Boundery wall by colouring fencing at sahebnagar Gp office |
350000 |
development og GP office Boundery wall by colouring fencing at sahebnagar Gp office 1 |
Plinth level |
-
latitude : 24.2489818
Longitude : 88.68948
file name : Image_22062023140612115.png
|
2023-06-22 14:06:12.209543 |
77 |
56565847 |
development og GP office Boundery wall by colouring fencing at sahebnagar Gp office |
350000 |
development og GP office Boundery wall by colouring fencing at sahebnagar Gp office 1 |
Completion of work |
-
latitude : 24.2489617
Longitude : 88.6892682
file name : Image_15062023132715676.png
|
2023-06-15 13:27:15.75965 |
78 |
56565847 |
development og GP office Boundery wall by colouring fencing at sahebnagar Gp office |
350000 |
development og GP office Boundery wall by colouring fencing at sahebnagar Gp office 1 |
Completion of work |
-
latitude : 24.2489506
Longitude : 88.6893833
file name : Image_15062023132330606.png
|
2023-06-15 13:23:30.693676 |
79 |
56570331 |
Water treatment plant of Mahidul house at south charkakmari mouza-sagarpara SDG 6.1 |
970000 |
Water treatment plant of Mahidul house at south charkakmari mouza-sagarpara SDG 6.11 |
Plinth level |
-
latitude : 24.259364744648337
Longitude : 88.71337945573032
file name : Image_30062023152210065.png
|
2023-06-30 15:22:10.187496 |
80 |
56570331 |
Water treatment plant of Mahidul house at south charkakmari mouza-sagarpara SDG 6.1 |
970000 |
Water treatment plant of Mahidul house at south charkakmari mouza-sagarpara SDG 6.11 |
Completion of work |
-
latitude : 24.259418305009604
Longitude : 88.71322371996939
file name : Image_22062023141158680.png
|
2023-06-22 14:11:58.78394 |
81 |
56570331 |
Water treatment plant of Mahidul house at south charkakmari mouza-sagarpara SDG 6.1 |
970000 |
Water treatment plant of Mahidul house at south charkakmari mouza-sagarpara SDG 6.11 |
Completion of work |
-
latitude : 24.259352423250675
Longitude : 88.71326252818108
file name : Image_22062023140640683.png
|
2023-06-22 14:06:40.793198 |
82 |
56570331 |
Water treatment plant of Mahidul house at south charkakmari mouza-sagarpara SDG 6.1 |
970000 |
Water treatment plant of Mahidul house at south charkakmari mouza-sagarpara SDG 6.11 |
Completion of work |
-
latitude : 24.25931889563799
Longitude : 88.7131632026285
file name : Image_22062023140427045.png
|
2023-06-22 14:04:27.156402 |
83 |
56570331 |
Water treatment plant of Mahidul house at south charkakmari mouza-sagarpara SDG 6.1 |
970000 |
Water treatment plant of Mahidul house at south charkakmari mouza-sagarpara SDG 6.11 |
Completion of work |
-
latitude : 24.25938058644533
Longitude : 88.7132541462779
file name : Image_22062023140736402.png
|
2023-06-22 14:07:36.515523 |
84 |
56661237 |
Construction of community Toilet at Nabingram Mukta Manch mouza- sagarpar SDG -6.2 |
300000 |
Construction of community Toilet at Nabingram Mukta Manch mouza- sagarpar SDG -6.21 |
Plinth level |
-
latitude : 24.233351130969822
Longitude : 88.69737018831074
file name : Image_30062023161520086.png
|
2023-06-30 16:15:20.180017 |
85 |
56661237 |
Construction of community Toilet at Nabingram Mukta Manch mouza- sagarpar SDG -6.2 |
300000 |
Construction of community Toilet at Nabingram Mukta Manch mouza- sagarpar SDG -6.21 |
Completion of work |
-
latitude : 24.23327519092709
Longitude : 88.69732056744397
file name : Image_30062023160700223.png
|
2023-06-30 16:07:00.319196 |
86 |
56565322 |
Construction of GP office Cycle /Motor Cycle garege at gp office under sahebnagar gp |
250000 |
Construction of GP office Cycle /Motor Cycle garege at gp office under sahebnagar gp 1 |
Plinth level |
-
latitude : 24.2489474
Longitude : 88.6893151
file name : Image_30062023154909690.png
|
2023-06-30 15:49:09.77085 |
87 |
56565322 |
Construction of GP office Cycle /Motor Cycle garege at gp office under sahebnagar gp |
250000 |
Construction of GP office Cycle /Motor Cycle garege at gp office under sahebnagar gp 1 |
Completion of work |
-
latitude : 24.2489214
Longitude : 88.6892466
file name : Image_30062023153919605.png
|
2023-06-30 15:39:19.697756 |
88 |
56565322 |
Construction of GP office Cycle /Motor Cycle garege at gp office under sahebnagar gp |
250000 |
Construction of GP office Cycle /Motor Cycle garege at gp office under sahebnagar gp 1 |
Completion of work |
-
latitude : 24.2489122
Longitude : 88.6892476
file name : Image_30062023153913537.png
|
2023-06-30 15:39:13.620191 |
89 |
56658827 |
Community Toilet at Ramakantapur Dakhin para at Ramakantapur Mouza-Sahebnagar SDG 6.2 |
300000 |
Community Toilet at Ramakantapur Dakhin para at Ramakantapur Mouza-Sahebnagar SDG 6.21 |
Plinth level |
-
latitude : 24.244447597302496
Longitude : 88.69816923514009
file name : Image_04072023141207733.png
|
2023-07-04 14:12:07.830626 |
90 |
56658827 |
Community Toilet at Ramakantapur Dakhin para at Ramakantapur Mouza-Sahebnagar SDG 6.2 |
300000 |
Community Toilet at Ramakantapur Dakhin para at Ramakantapur Mouza-Sahebnagar SDG 6.21 |
Completion of work |
-
latitude : 24.24440283793956
Longitude : 88.69825473055243
file name : Image_04072023140137653.png
|
2023-07-04 14:01:37.751036 |
91 |
56570457 |
Community toilet of Shirochar Mondir at shirochar mouza-sahebnagar SDG-6.2 |
300000 |
Community toilet of Shirochar Mondir at shirochar mouza-sahebnagar SDG-6.21 |
Plinth level |
-
latitude : 24.254855113103986
Longitude : 88.69411641731858
file name : Image_01082023152805182.png
|
2023-08-01 15:28:05.275332 |
92 |
56570457 |
Community toilet of Shirochar Mondir at shirochar mouza-sahebnagar SDG-6.2 |
300000 |
Community toilet of Shirochar Mondir at shirochar mouza-sahebnagar SDG-6.21 |
Completion of work |
-
latitude : 24.254851383157074
Longitude : 88.69412823580205
file name : Image_01082023152249808.png
|
2023-08-01 15:22:49.910037 |
93 |
56570457 |
Community toilet of Shirochar Mondir at shirochar mouza-sahebnagar SDG-6.2 |
300000 |
Community toilet of Shirochar Mondir at shirochar mouza-sahebnagar SDG-6.21 |
Completion of work |
-
latitude : 24.25477108452469
Longitude : 88.69404768571258
file name : Image_01082023152255270.png
|
2023-08-01 15:22:55.376213 |
94 |
56657992 |
water Treatment plant near Sahebnagar PWD road at Sahebnagar gp booth Mouza-Sahebnagar SDG -6.1 |
911808 |
water Treatment plant near Sahebnagar PWD road at Sahebnagar gp booth Mouza-Sahebnagar SDG -6.11 |
Roof laid |
-
latitude : 24.24857363
Longitude : 88.68811557
file name : Image_15012024130022227.png
|
2024-01-15 13:00:22.315067 |
95 |
56657992 |
water Treatment plant near Sahebnagar PWD road at Sahebnagar gp booth Mouza-Sahebnagar SDG -6.1 |
911808 |
water Treatment plant near Sahebnagar PWD road at Sahebnagar gp booth Mouza-Sahebnagar SDG -6.11 |
Plinth level |
-
latitude : 24.24859646
Longitude : 88.68810722
file name : Image_15012024125722591.png
|
2024-01-15 12:57:22.699516 |
96 |
56657992 |
water Treatment plant near Sahebnagar PWD road at Sahebnagar gp booth Mouza-Sahebnagar SDG -6.1 |
911808 |
water Treatment plant near Sahebnagar PWD road at Sahebnagar gp booth Mouza-Sahebnagar SDG -6.11 |
Completion of work |
-
latitude : 24.24859593
Longitude : 88.68815678
file name : Image_15012024125251937.png
|
2024-01-15 12:52:52.028457 |
97 |
56657992 |
water Treatment plant near Sahebnagar PWD road at Sahebnagar gp booth Mouza-Sahebnagar SDG -6.1 |
911808 |
water Treatment plant near Sahebnagar PWD road at Sahebnagar gp booth Mouza-Sahebnagar SDG -6.11 |
Completion of work |
-
latitude : 24.24861262
Longitude : 88.68813208
file name : Image_15012024125118045.png
|
2024-01-15 12:51:18.13465 |
98 |
66943011 |
Construction of roads |
299002 |
Construction of roads1 |
Roof laid |
-
latitude : 24.235181151889265,24.235182744450867
Longitude : 88.69946038350463,88.69946172460914
file name : Image_20122023125542691.png
|
2023-12-20 12:55:42.790027 |
99 |
66943011 |
Construction of roads |
299002 |
Construction of roads1 |
Plinth level |
-
latitude : 24.235154832713306,24.235138865187764,24.235138236545026
Longitude : 88.69951746426523,88.69951268658042,88.69951277039945
file name : Image_20122023124637309.png
|
2023-12-20 12:46:37.452835 |
100 |
66943011 |
Construction of roads |
299002 |
Construction of roads1 |
Completion of work |
-
latitude : 24.235220588743687,24.235220588743687
Longitude : 88.69943691417575,88.69943691417575
file name : Image_20122023122243837.png
|
2023-12-20 12:22:43.932582 |
101 |
66942627 |
Construction of roads |
248719 |
Construction of roads1 |
Roof laid |
-
latitude : 24.258730821311474,24.258730821311474,24.258730821311474,24.258730821311474
Longitude : 88.71665795333683,88.71665795333683,88.71665795333683,88.71665795333683
file name : Image_20122023140808004.png
|
2023-12-20 14:08:08.092695 |
102 |
66942627 |
Construction of roads |
248719 |
Construction of roads1 |
Plinth level |
-
latitude : 24.25871334504336,24.258713428862393,24.258713428862393
Longitude : 88.71660707518458,88.71660715900362,88.71660715900362
file name : Image_20122023135714008.png
|
2023-12-20 13:57:14.110212 |
103 |
66942627 |
Construction of roads |
248719 |
Construction of roads1 |
Completion of work |
-
latitude : 24.25869846716523,24.25869846716523
Longitude : 88.71658846735954,88.71658846735954
file name : Image_20122023133151521.png
|
2023-12-20 13:31:51.613777 |
104 |
66941874 |
Construction of roads |
245833 |
Construction of roads1 |
Roof laid |
-
latitude : 24.274180470965803,24.274180973879993
Longitude : 88.68982136249542,88.68980267085135
file name : Image_14122023140904332.png
|
2023-12-14 14:09:04.420331 |
105 |
66941874 |
Construction of roads |
245833 |
Construction of roads1 |
Plinth level |
-
latitude : 24.27417837549001,24.274133783765137,24.274126114323735
Longitude : 88.68980694562197,88.68977970443666,88.68978540413082
file name : Image_14122023140339549.png
|
2023-12-14 14:03:39.637378 |
106 |
66941874 |
Construction of roads |
245833 |
Construction of roads1 |
Completion of work |
-
latitude : 24.27404401358217,24.27414711099118
Longitude : 88.6898086220026,88.68976771831512
file name : Image_14122023135745609.png
|
2023-12-14 13:57:45.697199 |
107 |
66941874 |
Construction of roads |
245833 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2639062,24.274194301106036
Longitude : 88.6691948,88.68988364003599
file name : Image_14122023135403033.png
|
2023-12-14 13:54:03.125234 |
108 |
66943056 |
Construction of roads |
221645 |
Construction of roads1 |
Roof laid |
-
latitude : 24.23416015226394,24.23416015226394,24.23416015226394,24.23416015226394
Longitude : 88.70596373453736,88.70596373453736,88.70596373453736,88.70596373453736
file name : Image_28122023152103159.png
|
2023-12-28 15:21:03.250705 |
109 |
66943056 |
Construction of roads |
221645 |
Construction of roads1 |
Plinth level |
-
latitude : 24.234159355983138,24.234159355983138,24.234159355983138
Longitude : 88.70599189773202,88.70599189773202,88.70599189773202
file name : Image_28122023151729343.png
|
2023-12-28 15:17:29.442252 |
110 |
66943056 |
Construction of roads |
221645 |
Construction of roads1 |
Completion of work |
-
latitude : 24.23411715310067,24.23411715310067
Longitude : 88.70597873814404,88.70597873814404
file name : Image_28122023150544292.png
|
2023-12-28 15:05:44.373151 |
111 |
66942756 |
Construction of roads |
299249 |
Construction of roads1 |
Roof laid |
-
latitude : 24.26093270536512,24.26093270536512,24.26093270536512
Longitude : 88.69181172922254,88.69181172922254,88.69181172922254
file name : Image_05122023140517819.png
|
2023-12-05 14:05:17.912494 |
112 |
66942756 |
Construction of roads |
299249 |
Construction of roads1 |
Plinth level |
-
latitude : 24.2609804822132,24.2609804822132
Longitude : 88.69178834371269,88.69178834371269
file name : Image_01122023150237186.png
|
2023-12-01 15:02:37.28046 |
113 |
66942756 |
Construction of roads |
299249 |
Construction of roads1 |
Completion of work |
-
latitude : 24.260984589345753,24.260984589345753
Longitude : 88.69181768037379,88.69181768037379
file name : Image_01122023145941290.png
|
2023-12-01 14:59:41.393632 |
114 |
66941915 |
Construction of roads |
300651 |
Construction of roads1 |
Roof laid |
-
latitude : 24.260919503867626,24.260931070894003,24.260930106975138
Longitude : 88.71580936945975,88.71585010550916,88.71584951877594
file name : Image_27122023141906061.png
|
2023-12-27 14:19:06.140643 |
115 |
66941915 |
Construction of roads |
300651 |
Construction of roads1 |
Plinth level |
-
latitude : 24.26094272173941,24.260896579362452
Longitude : 88.71585320681334,88.71585379354656
file name : Image_27122023141206575.png
|
2023-12-27 14:12:06.665696 |
116 |
66941915 |
Construction of roads |
300651 |
Construction of roads1 |
Completion of work |
-
latitude : 24.26093878224492,24.26093878224492,24.26093878224492
Longitude : 88.71581926010549,88.71581926010549,88.71581926010549
file name : Image_27122023140903184.png
|
2023-12-27 14:09:03.265989 |
117 |
66930142 |
Drinking water facility |
1464618 |
Drinking water facility1 |
Roof laid |
-
latitude : 24.2472592
Longitude : 88.6943319
file name : Image_13022024133333786.png
|
2024-02-13 13:33:33.921113 |
118 |
66930142 |
Drinking water facility |
1464618 |
Drinking water facility1 |
Plinth level |
-
latitude : 24.2472577
Longitude : 88.6943316
file name : Image_13022024132819810.png
|
2024-02-13 13:28:19.939959 |
119 |
66930142 |
Drinking water facility |
1464618 |
Drinking water facility1 |
Completion of work |
-
latitude : 24.2472567
Longitude : 88.6943299
file name : Image_13022024130335358.png
|
2024-02-13 13:03:35.488771 |
120 |
66928359 |
Construction of Toilets for male/Female |
236761 |
Construction of Toilets for male/Female1 |
Roof laid |
-
latitude : 24.271106666666665
Longitude : 88.68121000000001
file name : Image_05042024145247059.png
|
2024-04-05 14:52:47.046359 |
121 |
66928359 |
Construction of Toilets for male/Female |
236761 |
Construction of Toilets for male/Female1 |
Completion of work |
-
latitude : 24.2489489
Longitude : 88.6891904
file name : Image_28032024165419163.png
|
2024-03-28 16:54:19.272116 |
122 |
66928359 |
Construction of Toilets for male/Female |
236761 |
Construction of Toilets for male/Female1 |
Plinth level |
-
latitude : 24.271136666666667
Longitude : 88.68128166666665
file name : Image_05042024144932822.png
|
2024-04-05 14:49:32.931721 |
123 |
66928359 |
Construction of Toilets for male/Female |
236761 |
Construction of Toilets for male/Female1 |
Completion of work |
-
latitude : 24.271013333333332
Longitude : 88.68131999999999
file name : Image_05042024144623319.png
|
2024-04-05 14:46:23.413453 |
124 |
66929119 |
Construction of Toilets for male/Female |
236974 |
Construction of Toilets for male/Female1 |
Roof laid |
-
latitude : 24.23667833333333
Longitude : 88.69548000000002
file name : Image_22032024171151992.png
|
2024-03-22 17:11:52.085491 |
125 |
66929119 |
Construction of Toilets for male/Female |
236974 |
Construction of Toilets for male/Female1 |
Plinth level |
-
latitude : 24.236653333333333
Longitude : 88.69544166666668
file name : Image_22032024165653698.png
|
2024-03-22 16:56:53.79407 |
126 |
66929119 |
Construction of Toilets for male/Female |
236974 |
Construction of Toilets for male/Female1 |
Completion of work |
-
latitude : 24.236610000000002
Longitude : 88.69536833333335
file name : Image_22032024165155748.png
|
2024-03-22 16:51:55.842125 |
127 |
66930239 |
Drinking water facility |
1464472 |
Drinking water facility1 |
Roof laid |
-
latitude : 24.23603601
Longitude : 88.70850674
file name : Image_13022024143431856.png
|
2024-02-13 14:34:31.979722 |
128 |
66930239 |
Drinking water facility |
1464472 |
Drinking water facility1 |
Plinth level |
-
latitude : 24.23597259
Longitude : 88.7085375
file name : Image_13022024142627309.png
|
2024-02-13 14:26:27.434143 |
129 |
66930239 |
Drinking water facility |
1464472 |
Drinking water facility1 |
Completion of work |
-
latitude : 24.23616985
Longitude : 88.70836471
file name : Image_13022024135410627.png
|
2024-02-13 13:54:10.776148 |
130 |
66965209 |
Repairing and maintenance of roads |
290000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 24.2640876,24.264187146909535,24.264085,24.264085
Longitude : 88.6887805,88.68747903965414,88.6887777,88.6887777
file name : Image_08122023145605696.png
|
2023-12-08 14:56:05.776498 |
131 |
66965209 |
Repairing and maintenance of roads |
290000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 24.264146243222058,24.264146243222058
Longitude : 88.68750032968819,88.68750032968819
file name : Image_08122023145236892.png
|
2023-12-08 14:52:36.990342 |
132 |
66965209 |
Repairing and maintenance of roads |
290000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 24.2640849,24.2640849,24.2640849
Longitude : 88.6887727,88.6887727,88.6887727
file name : Image_08122023144801601.png
|
2023-12-08 14:48:01.690022 |
133 |
66930188 |
Drinking water facility |
1432658 |
Drinking water facility1 |
Roof laid |
-
latitude : 24.25452878
Longitude : 88.68294648
file name : Image_13022024151714740.png
|
2024-02-13 15:17:14.83079 |
134 |
66930188 |
Drinking water facility |
1432658 |
Drinking water facility1 |
Plinth level |
-
latitude : 24.25448059
Longitude : 88.6829044
file name : Image_13022024151217756.png
|
2024-02-13 15:12:17.844668 |
135 |
66930188 |
Drinking water facility |
1432658 |
Drinking water facility1 |
Completion of work |
-
latitude : 24.25447652
Longitude : 88.6829164
file name : Image_13022024150602737.png
|
2024-02-13 15:06:02.813137 |
136 |
66930049 |
Operation and Maintenance of drinking water supply system |
200000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.2490475
Longitude : 88.6895607
file name : Image_07032024141558611.png
|
2024-03-07 14:15:58.723251 |
137 |
66930049 |
Operation and Maintenance of drinking water supply system |
200000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 24.2490567
Longitude : 88.6896219
file name : Image_07032024141552056.png
|
2024-03-07 14:15:52.19692 |
138 |
66943243 |
Internet in GP Bhawan |
298000 |
Internet in GP Bhawan1 |
Completion of work |
-
latitude : 24.2489586
Longitude : 88.6892048
file name : Image_01072024140049274.png
|
2024-07-01 14:00:49.442931 |
139 |
89458339 |
Procurement of Tarpaulin Utensils Furniture, etc. for Community Hall |
415000 |
Procurement of Tarpaulin Utensils Furniture, etc. for Community Hall1 |
Completion of work |
-
latitude : 24.2489604
Longitude : 88.6892175
file name : Image_01072024141706655.png
|
2024-07-01 14:17:06.748257 |
140 |
46967391 |
Installation of water treatment plant infront of Lalkup colony Haat at Khayertala under Sahebnagar |
1100000 |
Installation of water treatment plant infront of Lalkup colony Haat at Khayertala under Sahebnagar 1 |
Completion of work |
-
latitude : 24.269687812775373
Longitude : 88.68281400762498
file name : Image_06062022145304775.png
|
2022-06-06 14:53:04.88248 |
141 |
106655562 |
Procurement of Furniture |
200000 |
Procurement of Furniture1 |
Completion of work |
-
latitude : 24.2489715
Longitude : 88.6892249
file name : Image_04072024141313021.png
|
2024-07-04 14:13:13.1228 |
142 |
106655258 |
Construction of roads |
99783 |
Construction of roads1 |
Roof laid |
-
latitude : 24.246836666666663,24.24684166666667
Longitude : 88.69239999999999,88.69232833333332
file name : Image_15072024125317503.png
|
2024-07-15 12:53:17.601745 |
143 |
106655258 |
Construction of roads |
99783 |
Construction of roads1 |
Plinth level |
-
latitude : 24.246848333333332,24.24685833333333
Longitude : 88.69236333333335,88.692395
file name : Image_15072024125056436.png
|
2024-07-15 12:50:56.535983 |
144 |
106655258 |
Construction of roads |
99783 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2491075,24.2472935
Longitude : 88.6896928,88.6910554
file name : Image_15072024124717323.png
|
2024-07-15 12:47:17.424744 |
145 |
106574790 |
Construction of roads |
99845 |
Construction of roads1 |
Roof laid |
-
latitude : 24.261208333333336,24.261208333333336,24.261208333333336,24.261208333333336
Longitude : 88.71575333333334,88.71575333333334,88.71575333333334,88.71575333333334
file name : Image_16072024124846288.png
|
2024-07-16 12:48:46.416993 |
146 |
106574790 |
Construction of roads |
99845 |
Construction of roads1 |
Plinth level |
-
latitude : 24.26121333333333,24.26121333333333,24.26121333333333
Longitude : 88.71573500000001,88.71573500000001,88.71573500000001
file name : Image_16072024124229842.png
|
2024-07-16 12:42:29.938822 |
147 |
106574790 |
Construction of roads |
99845 |
Construction of roads1 |
Completion of work |
-
latitude : 24.131615000000004,24.261221666666664
Longitude : 88.53889499999998,88.71575
file name : Image_16072024123743494.png
|
2024-07-16 12:37:43.580417 |
148 |
106655010 |
Procurement of Furniture |
99495 |
Procurement of Furniture1 |
|
-
latitude : 24.2486478
Longitude : 88.6893931
file name : Image_16072024135657843.png
|
2024-07-16 13:56:57.96186 |
149 |
89451332 |
Repairing and maintenance of roads |
249372 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 24.248935,24.250706666666662
Longitude : 88.68927833333333,88.69032333333334
file name : Image_03102024165434069.png
|
2024-10-03 16:54:34.196568 |
150 |
89501348 |
Creation of a new source of drinking water |
425000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.261298333333336
Longitude : 88.68599999999999
file name : Image_03102024173328253.png
|
2024-10-03 17:33:28.36129 |
151 |
106655141 |
Construction of roads |
185969 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2440723,24.2440336
Longitude : 88.6922874,88.6923024
file name : Image_04102024145435388.png
|
2024-10-04 14:54:35.537605 |
152 |
106655396 |
Construction of roads |
69130 |
Construction of roads1 |
Roof laid |
-
latitude : 24.246941666666665,24.246941666666665
Longitude : 88.69131666666665,88.69131666666665
file name : Image_18072024133548001.png
|
2024-07-18 13:35:48.098985 |
153 |
106655396 |
Construction of roads |
69130 |
Construction of roads1 |
Plinth level |
-
latitude : 24.24692333333333,24.24692333333333
Longitude : 88.69131833333334,88.69131833333334
file name : Image_18072024133414831.png
|
2024-07-18 13:34:14.930575 |
154 |
106655396 |
Construction of roads |
69130 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2472677,24.2472677
Longitude : 88.6910363,88.6910363
file name : Image_18072024133102479.png
|
2024-07-18 13:31:02.579173 |
155 |
106655665 |
Construction of roads |
76326 |
Construction of roads1 |
Roof laid |
-
latitude : 24.247731666666663,24.247716666666665
Longitude : 88.686815,88.68682333333332
file name : Image_25072024173459435.png
|
2024-07-25 17:34:59.554643 |
156 |
106655665 |
Construction of roads |
76326 |
Construction of roads1 |
Roof laid |
-
latitude : 24.247618333333335,24.247613333333334
Longitude : 88.68695666666666,88.686955
file name : Image_25072024173504863.png
|
2024-07-25 17:35:04.95937 |
157 |
106655665 |
Construction of roads |
76326 |
Construction of roads1 |
Plinth level |
-
latitude : 24.2490416,24.2490415
Longitude : 88.6879793,88.6879805
file name : Image_22072024141902769.png
|
2024-07-22 14:19:02.855188 |
158 |
106655665 |
Construction of roads |
76326 |
Construction of roads1 |
Completion of work |
-
latitude : 24.2490415,24.2490415
Longitude : 88.6879816,88.6879805
file name : Image_22072024141239990.png
|
2024-07-22 14:12:40.076844 |
159 |
92509151 |
Creation of a new source of drinking water |
1466085 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.2509746
Longitude : 88.6875319
file name : Image_25072024174645647.png
|
2024-07-25 17:46:45.789997 |
160 |
92509151 |
Creation of a new source of drinking water |
1466085 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.2509623
Longitude : 88.6874457
file name : Image_25072024174145100.png
|
2024-07-25 17:41:45.240927 |
161 |
92509151 |
Creation of a new source of drinking water |
1466085 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.2509801
Longitude : 88.6875361
file name : Image_25072024173629875.png
|
2024-07-25 17:36:29.976029 |
162 |
92508498 |
Creation of a new source of drinking water |
348447 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.24243166666667
Longitude : 88.69648833333333
file name : Image_25072024185300761.png
|
2024-07-25 18:53:00.862267 |
163 |
92488753 |
Creation of a new source of drinking water |
348447 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.26070333333333
Longitude : 88.69851833333333
file name : Image_29072024170412995.png
|
2024-07-29 17:04:13.11614 |
164 |
92490206 |
Water Supply to villages |
348447 |
Water Supply to villages1 |
Completion of work |
-
latitude : 24.239660000000004
Longitude : 88.70642333333332
file name : Image_29072024164803554.png
|
2024-07-29 16:48:03.656704 |
165 |
106654620 |
Construction of Child friendly Park |
95250 |
Construction of Child friendly Park1 |
Completion of work |
-
latitude : 24.2489463,24.2489864
Longitude : 88.6891893,88.6892102
file name : Image_26072024140157269.png
|
2024-07-26 14:01:57.361115 |
166 |
106575686 |
Construction of Store Room in GP Bhawan |
70120 |
Construction of Store Room in GP Bhawan1 |
Completion of work |
-
latitude : 24.2489789
Longitude : 88.689223
file name : Image_30072024160528192.png
|
2024-07-30 16:05:28.278271 |
167 |
89455750 |
Electricity Connection/ Electricity bill payment in Gram Panchayat Bhawan |
160000 |
Electricity Connection/ Electricity bill payment in Gram Panchayat Bhawan1 |
Completion of work |
-
latitude : 24.2489398
Longitude : 88.6891841
file name : Image_08082024140208133.png
|
2024-08-08 14:02:08.208656 |
168 |
66928947 |
Construction of Toilets for male/Female |
171000 |
Construction of Toilets for male/Female1 |
Completion of work |
-
latitude : 24.2485668
Longitude : 88.689477
file name : Image_27082024123308024.png
|
2024-08-27 12:33:08.564218 |
169 |
92491909 |
Construction of toilets in public institutions |
170000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 24.254520000000003
Longitude : 88.68495833333333
file name : Image_13082024135727980.png
|
2024-08-13 13:57:28.067523 |
170 |
89502828 |
Creation of a new source of drinking water |
425000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.266256666666663
Longitude : 88.68416666666666
file name : Image_12112024121412673.png
|
2024-11-12 12:14:12.759771 |
171 |
89502828 |
Creation of a new source of drinking water |
425000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.266288333333332
Longitude : 88.68420833333333
file name : Image_12112024121107840.png
|
2024-11-12 12:11:07.938086 |