1 |
34644258 |
Installation of Arsanic free drinking water plant at village Bhatu Komnagar |
335000 |
Installation of Arsanic free drinking water plant at village Bhatu Komnagar1 |
Completion of work |
-
latitude : 24.20739848
Longitude : 88.53825849
file name : Image_07102021120148886.png
|
2021-10-07 12:01:48.987534 |
2 |
34642866 |
Installation od Arsanic free Drinking water plant KM Para |
335000 |
Installation od Arsanic free Drinking water plant KM Para1 |
Completion of work |
-
latitude : 24.23805849
Longitude : 88.52942323
file name : Image_07102021123144909.png
|
2021-10-07 12:31:45.003235 |
3 |
39082732 |
Installation of Arsenic free drinking water plant at village Kalinagar Madhya |
335000 |
Installation of Arsenic free drinking water plant at village Kalinagar Madhya1 |
Completion of work |
-
latitude : 24.22069373
Longitude : 88.53894502
file name : Image_07102021121022947.png
|
2021-10-07 12:10:23.033102 |
4 |
34591614 |
Layer upgradation CC road from Bipad to Sanjay |
852000 |
Layer upgradation CC road from Bipad to Sanjay1 |
Completion of work |
-
latitude : 24.23812374,24.23805929
Longitude : 88.53829483,88.5382534
file name : Image_19112021135816983.png
|
2021-11-19 13:58:17.118768 |
5 |
34580255 |
Layer upgradation of road from Earthen to BT road from Milan to Pitch road |
1177024 |
Layer upgradation of road from Earthen to BT road from Milan to Pitch road1 |
Completion of work |
-
latitude : 24.25764247,24.25765196
Longitude : 88.52529833,88.52532617
file name : Image_15012021144929848.png
|
2021-01-15 14:49:29.963101 |
6 |
34643599 |
Installation of Arsanic free drinking water plant at village Sitanagar |
291788 |
Installation of Arsanic free drinking water plant at village Sitanagar1 |
Completion of work |
-
latitude : 24.1983056
Longitude : 88.53542549
file name : Image_22032021125505290.png
|
2021-03-22 12:55:05.409472 |
7 |
39082851 |
Installation of Arsenic free drinking water plant at village Kalinagar Khastaluk |
291788 |
Installation of Arsenic free drinking water plant at village Kalinagar Khastaluk1 |
Completion of work |
-
latitude : 24.21723779
Longitude : 88.53264945
file name : Image_22032021124754893.png
|
2021-03-22 12:47:55.006076 |
8 |
34757889 |
Upgradation and Maintenance of GP Office Building |
550000 |
Upgradation and Maintenance of GP Office Building 1 |
Completion of work |
-
latitude : 24.2250444
Longitude : 88.5452894
file name : Image_19032021154756907.png
|
2021-03-19 15:47:57.073428 |
9 |
34662567 |
Construction of Boundary Wall of G.P Office Buliding Sub Health Center at Komnagar |
210000 |
Construction of Boundary Wall of G.P Office Buliding Sub Health Center at Komnagar1 |
Completion of work |
-
latitude : 24.22242726
Longitude : 88.54634154
file name : Image_23032021122913600.png
|
2021-03-23 12:29:13.69952 |
10 |
34665022 |
Maintenance and Cleaning of Drain all over GP area |
350000 |
Maintenance and Cleaning of Drain all over GP area1 |
Completion of work |
-
latitude : 24.2249527,24.2249507
Longitude : 88.5450268,88.5450186
file name : Image_26072021152408110.png
|
2021-07-26 15:24:08.216582 |
11 |
34647820 |
Construction of Boundary Wall Bablabona MSK School Bablabona |
350000 |
Construction of Boundary Wall Bablabona MSK School Bablabona1 |
Completion of work |
-
latitude : 24.24553037
Longitude : 88.52990659
file name : Image_09112021171443925.png
|
2021-11-09 17:14:44.034661 |
12 |
34601322 |
Operation Maintanance of P C C road through out GP Area |
182106 |
Operation Maintanance of P C C road through out GP Area1 |
Completion of work |
-
latitude : 24.21818654,24.21818828
Longitude : 88.53345948,88.53346025
file name : Image_10022022153622101.png
|
2022-02-10 15:36:22.161484 |
13 |
39082923 |
Rain Water Harvesting of Ramnagar Nawdapara SSK School at village Ramnagar Nawdapara |
245000 |
Rain Water Harvesting of Ramnagar Nawdapara SSK School at village Ramnagar Nawdapara 1 |
Completion of work |
-
latitude : 24.24250496
Longitude : 88.53595999
file name : Image_28012022160849560.png
|
2022-01-28 16:08:49.76285 |
14 |
34764877 |
Making Breast Feeding Cell Cabin of GP Office |
50000 |
Making Breast Feeding Cell Cabin of GP Office1 |
Completion of work |
-
latitude : 24.2251238
Longitude : 88.5452563
file name : Image_22032022134920284.png
|
2022-03-22 13:49:20.401681 |
15 |
47377912 |
Layer upgradation of road from Earthen to BT road from ho Abdul Bari to ho Jamela R Sarkarpara |
450000 |
Layer upgradation of road from Earthen to BT road from ho Abdul Bari to ho Jamela R Sarkarpara1 |
Completion of work |
-
latitude : 24.25692048,24.25691952
Longitude : 88.52569261,88.52569286
file name : Image_25032022171832172.png
|
2022-03-25 17:18:32.271453 |
16 |
47389565 |
Layer upgradation of road from Earthen to CC road from Pitch road to ho Sadhan Mondal R Kacharipara |
519170 |
Layer upgradation of road from Earthen to CC road from Pitch road to ho Sadhan Mondal R Kacharipara1 |
Completion of work |
-
latitude : 24.2483681,24.2483692
Longitude : 88.53028548,88.5302888
file name : Image_29032022131459029.png
|
2022-03-29 13:14:59.125813 |
17 |
34609886 |
Sinking Resinking and Maintenance of Tube Well at all Sansad |
254000 |
Sinking Resinking and Maintenance of Tube Well at all Sansad 1 |
Completion of work |
-
latitude : 24.22857052
Longitude : 88.53599158
file name : Image_08022022125621869.png
|
2022-02-08 12:56:21.972647 |
18 |
47395919 |
Sinking Resinking and Maintenance of Tube Well at all Sansad and Arsanic free drinking water also u |
126555 |
Sinking Resinking and Maintenance of Tube Well at all Sansad and Arsanic free drinking water also u1 |
Completion of work |
-
latitude : 24.2248292
Longitude : 88.5443116
file name : Image_06072022134835861.png
|
2022-07-06 13:48:35.966689 |
19 |
47378457 |
Layer upgradation of road from Earthen to CC road from Eidgaha to ho Babu at Kalinagar Khastaluk |
515000 |
Layer upgradation of road from Earthen to CC road from Eidgaha to ho Babu at Kalinagar Khastaluk1 |
Completion of work |
-
latitude : 24.21557382,24.21555211,24.21556705
Longitude : 88.53492616,88.53495449,88.5349962
file name : Image_16082022123030496.png
|
2022-08-16 12:30:30.591648 |
20 |
47379525 |
Layer upgradation of road from Earthen to CC road from ho Nantu Babu to ho Muktar Ali Komnagar uttar |
450000 |
Layer upgradation of road from Earthen to CC road from ho Nantu Babu to ho Muktar Ali Komnagar uttar1 |
Completion of work |
-
latitude : 24.22792071,24.22780804,24.22793262
Longitude : 88.54466958,88.54468032,88.54465251
file name : Image_16082022124942501.png
|
2022-08-16 12:49:42.625615 |
21 |
47397864 |
Community drinking water Purification plant with spot source for removal of Arsenic at Sitanagar |
882159 |
Community drinking water Purification plant with spot source for removal of Arsenic at Sitanagar1 |
Completion of work |
-
latitude : 24.19748178
Longitude : 88.53688401
file name : Image_18082022150640405.png
|
2022-08-18 15:06:40.502591 |
22 |
47396634 |
Installation of Arsanic free drinking water plant at village Kalinagar Mirpara |
350000 |
Installation of Arsanic free drinking water plant at village Kalinagar Mirpara1 |
Completion of work |
-
latitude : 24.23141252
Longitude : 88.53251028
file name : Image_30082022143309335.png
|
2022-08-30 14:33:09.439382 |
23 |
47396975 |
Installation of Arsanic free drinking water plant at village Komnagar Dakshin |
350000 |
Installation of Arsanic free drinking water plant at village Komnagar Dakshin1 |
Completion of work |
-
latitude : 24.26528045
Longitude : 88.49817159
file name : Image_30082022142421495.png
|
2022-08-30 14:24:21.595725 |
24 |
47401751 |
Maintenance and Cleaning of Drain all over GP area under Kalinagar II GP |
224309 |
Maintenance and Cleaning of Drain all over GP area under Kalinagar II GP1 |
Completion of work |
-
latitude : 24.2552018,24.25524961
Longitude : 88.53799982,88.53791192
file name : Image_15062022111234656.png
|
2022-06-15 11:12:34.757534 |
25 |
47391055 |
Operation & Maintanance of P C C road through out GP Area |
32000 |
Operation & Maintanance of P C C road through out GP Area1 |
Completion of work |
-
latitude : 24.2235128,24.2235372
Longitude : 88.5477425,88.5477983
file name : Image_20092022135134725.png
|
2022-09-20 13:51:34.845304 |
26 |
67150249 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.23320612,24.23318788
Longitude : 88.53134336,88.53135785
file name : Image_28022024123234837.png
|
2024-02-28 12:32:34.932266 |
27 |
67150249 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.23319881,24.23319872
Longitude : 88.53131332,88.53131344
file name : Image_28022024122834378.png
|
2024-02-28 12:28:34.468797 |
28 |
67150249 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.23318566,24.23315473
Longitude : 88.53126077,88.53127216
file name : Image_28022024122309707.png
|
2024-02-28 12:23:09.794243 |
29 |
57096305 |
Construction of Boundary Wall of Borar Bill Children Park at Ramnagar Kacharipara |
136672 |
Construction of Boundary Wall of Borar Bill Children Park at Ramnagar Kacharipara1 |
Completion of work |
-
latitude : 24.26591038
Longitude : 88.4966889
file name : Image_21032023112255443.png
|
2023-03-21 11:22:55.539425 |
30 |
56951269 |
Community drinking water purification plant at Bablabona |
911336 |
Community drinking water purification plant at Bablabona1 |
Completion of work |
-
latitude : 24.2478198
Longitude : 88.5346271
file name : Image_30032023112032380.png
|
2023-03-30 11:20:32.50787 |
31 |
57022360 |
Construction of Boundary Wall Bablabona M S K at village Bablabona |
350000 |
Construction of Boundary Wall Bablabona M S K at village Bablabona1 |
Roof laid |
-
latitude : 24.2455747
Longitude : 88.52985709
file name : Image_30082024165825747.png
|
2024-08-30 16:58:26.60148 |
32 |
57022360 |
Construction of Boundary Wall Bablabona M S K at village Bablabona |
350000 |
Construction of Boundary Wall Bablabona M S K at village Bablabona1 |
Plinth level |
-
latitude : 24.24556468
Longitude : 88.52970403
file name : Image_30082024165342391.png
|
2024-08-30 16:53:43.172802 |
33 |
57022360 |
Construction of Boundary Wall Bablabona M S K at village Bablabona |
350000 |
Construction of Boundary Wall Bablabona M S K at village Bablabona1 |
Completion of work |
-
latitude : 24.24560927
Longitude : 88.53003227
file name : Image_30082024164531786.png
|
2024-08-30 16:45:32.48596 |
34 |
56956234 |
Construction of Pucca Drain from ho Abdul Khalek to ho Siraj Mallik at Sitanagar |
340000 |
Construction of Pucca Drain from ho Abdul Khalek to ho Siraj Mallik at Sitanagar1 |
Completion of work |
-
latitude : 24.19805364,24.19801745
Longitude : 88.53576947,88.53560945
file name : Image_28032023145812193.png
|
2023-03-28 14:58:12.300498 |
35 |
57014796 |
Upgradation and Maintenance of GP Office Building |
127743 |
Upgradation and Maintenance of GP Office Building 1 |
Completion of work |
-
latitude : 24.2251837
Longitude : 88.5453418
file name : Image_29032023162854354.png
|
2023-03-29 16:28:54.446369 |
36 |
57017966 |
Construction of CC road from Kalinagar Sarkarpara pitch road to ho Ajimuddin at Khastaluk |
272094 |
Construction of CC road from Kalinagar Sarkarpara pitch road to ho Ajimuddin at Khastaluk1 |
Roof laid |
-
latitude : 24.21828416,24.21828334
Longitude : 88.53421508,88.53422178
file name : Image_15052023162529195.png
|
2023-05-15 16:25:29.288595 |
37 |
57017966 |
Construction of CC road from Kalinagar Sarkarpara pitch road to ho Ajimuddin at Khastaluk |
272094 |
Construction of CC road from Kalinagar Sarkarpara pitch road to ho Ajimuddin at Khastaluk1 |
Plinth level |
-
latitude : 24.21847691,24.21847726
Longitude : 88.53431093,88.53431102
file name : Image_12052023124845763.png
|
2023-05-12 12:48:45.864194 |
38 |
57017966 |
Construction of CC road from Kalinagar Sarkarpara pitch road to ho Ajimuddin at Khastaluk |
272094 |
Construction of CC road from Kalinagar Sarkarpara pitch road to ho Ajimuddin at Khastaluk1 |
Completion of work |
-
latitude : 24.21844831,24.21844954
Longitude : 88.53417818,88.53417322
file name : Image_11052023121141575.png
|
2023-05-11 12:11:41.672502 |
39 |
57015362 |
Construction of CC road from Komnagar Pry School to ho Najrul at Komnagar Dakshin |
770000 |
Construction of CC road from Komnagar Pry School to ho Najrul at Komnagar Dakshin1 |
Roof laid |
-
latitude : 24.22192666,24.22192635
Longitude : 88.54676131,88.54676168
file name : Image_12072024171813650.png
|
2024-07-12 17:18:13.742115 |
40 |
57015362 |
Construction of CC road from Komnagar Pry School to ho Najrul at Komnagar Dakshin |
770000 |
Construction of CC road from Komnagar Pry School to ho Najrul at Komnagar Dakshin1 |
Plinth level |
-
latitude : 24.22195178,24.22195847
Longitude : 88.54673153,88.54673108
file name : Image_19052023143943493.png
|
2023-05-19 14:39:43.597654 |
41 |
57015362 |
Construction of CC road from Komnagar Pry School to ho Najrul at Komnagar Dakshin |
770000 |
Construction of CC road from Komnagar Pry School to ho Najrul at Komnagar Dakshin1 |
Completion of work |
-
latitude : 24.22201727,24.22201687
Longitude : 88.54675336,88.54675365
file name : Image_16052023141902079.png
|
2023-05-16 14:19:02.176819 |
42 |
56952378 |
Community drinking water purification plant at Sitanagar |
911031 |
Community drinking water purification plant at Sitanagar1 |
Plinth level |
-
latitude : 24.19443287
Longitude : 88.53349125
file name : Image_12072024170549949.png
|
2024-07-12 17:05:50.054253 |
43 |
56952378 |
Community drinking water purification plant at Sitanagar |
911031 |
Community drinking water purification plant at Sitanagar1 |
Completion of work |
-
latitude : 24.19453761
Longitude : 88.53346827
file name : Image_12072024170137804.png
|
2024-07-12 17:01:37.908265 |
44 |
56952378 |
Community drinking water purification plant at Sitanagar |
911031 |
Community drinking water purification plant at Sitanagar1 |
Completion of work |
-
latitude : 24.19446182
Longitude : 88.53340216
file name : Image_31102023115100791.png
|
2023-10-31 11:51:00.91811 |
45 |
47400964 |
Construction of Pucca Drain from house of Maksed to house of Emrul Kaifs at village Kalinagar Madhya |
350000 |
Construction of Pucca Drain from house of Maksed to house of Emrul Kaifs at village Kalinagar Madhya1 |
Roof laid |
-
latitude : 24.22077925,24.22079358
Longitude : 88.53967322,88.53968043
file name : Image_31052023115926141.png
|
2023-05-31 11:59:26.231576 |
46 |
47400964 |
Construction of Pucca Drain from house of Maksed to house of Emrul Kaifs at village Kalinagar Madhya |
350000 |
Construction of Pucca Drain from house of Maksed to house of Emrul Kaifs at village Kalinagar Madhya1 |
Plinth level |
-
latitude : 24.22086515,24.2208663
Longitude : 88.53969424,88.53969427
file name : Image_30052023132229969.png
|
2023-05-30 13:22:30.084702 |
47 |
47400964 |
Construction of Pucca Drain from house of Maksed to house of Emrul Kaifs at village Kalinagar Madhya |
350000 |
Construction of Pucca Drain from house of Maksed to house of Emrul Kaifs at village Kalinagar Madhya1 |
Completion of work |
-
latitude : 24.2209375,24.22093751
Longitude : 88.53972027,88.53972027
file name : Image_25032022164936959.png
|
2022-03-25 16:49:37.066352 |
48 |
39082982 |
Construction of Pucca Drain from Pitch Road to ho Alauddin at village Kalinagar Khastaluk |
350000 |
Construction of Pucca Drain from Pitch Road to ho Alauddin at village Kalinagar Khastaluk1 |
Roof laid |
-
latitude : 24.21690675,24.21690567
Longitude : 88.53261779,88.5326164
file name : Image_31052023120248751.png
|
2023-05-31 12:02:48.852076 |
49 |
39082982 |
Construction of Pucca Drain from Pitch Road to ho Alauddin at village Kalinagar Khastaluk |
350000 |
Construction of Pucca Drain from Pitch Road to ho Alauddin at village Kalinagar Khastaluk1 |
Plinth level |
-
latitude : 24.21676474,24.21676572
Longitude : 88.53265549,88.53265574
file name : Image_30052023131651654.png
|
2023-05-30 13:16:51.75604 |
50 |
39082982 |
Construction of Pucca Drain from Pitch Road to ho Alauddin at village Kalinagar Khastaluk |
350000 |
Construction of Pucca Drain from Pitch Road to ho Alauddin at village Kalinagar Khastaluk1 |
Completion of work |
-
latitude : 24.23501582,24.23501582,24.21659207
Longitude : 88.53953912,88.53953912,88.53272804
file name : Image_28012022165017549.png
|
2022-01-28 16:50:17.751283 |
51 |
47401446 |
Construction of Pucca Drain from house of Tahasin to house of Bakkar At Village Bablabona |
350000 |
Construction of Pucca Drain from house of Tahasin to house of Bakkar At Village Bablabona1 |
Roof laid |
-
latitude : 24.24573285,24.24576202
Longitude : 88.5301098,88.53007529
file name : Image_31052023112934531.png
|
2023-05-31 11:29:34.623219 |
52 |
47401446 |
Construction of Pucca Drain from house of Tahasin to house of Bakkar At Village Bablabona |
350000 |
Construction of Pucca Drain from house of Tahasin to house of Bakkar At Village Bablabona1 |
Plinth level |
-
latitude : 24.24583221,24.24583226
Longitude : 88.53002582,88.53002581
file name : Image_30052023141324124.png
|
2023-05-30 14:13:24.214402 |
53 |
47401446 |
Construction of Pucca Drain from house of Tahasin to house of Bakkar At Village Bablabona |
350000 |
Construction of Pucca Drain from house of Tahasin to house of Bakkar At Village Bablabona1 |
Completion of work |
-
latitude : 24.24584336,24.24585214
Longitude : 88.53003377,88.53002484
file name : Image_25032022170551515.png
|
2022-03-25 17:05:51.598261 |
54 |
47401109 |
Construction of Pucca Drain from house of Iyasin to Shiyalmari River At Village Bhatu Komnagar |
175000 |
Construction of Pucca Drain from house of Iyasin to Shiyalmari River At Village Bhatu Komnagar1 |
Roof laid |
-
latitude : 24.20627616,24.20627642
Longitude : 88.53415876,88.53415894
file name : Image_31052023120851660.png
|
2023-05-31 12:08:51.787234 |
55 |
47401109 |
Construction of Pucca Drain from house of Iyasin to Shiyalmari River At Village Bhatu Komnagar |
175000 |
Construction of Pucca Drain from house of Iyasin to Shiyalmari River At Village Bhatu Komnagar1 |
Plinth level |
-
latitude : 24.2064133,24.20641274
Longitude : 88.53410913,88.53410933
file name : Image_30052023130915967.png
|
2023-05-30 13:09:16.065638 |
56 |
47401109 |
Construction of Pucca Drain from house of Iyasin to Shiyalmari River At Village Bhatu Komnagar |
175000 |
Construction of Pucca Drain from house of Iyasin to Shiyalmari River At Village Bhatu Komnagar1 |
Completion of work |
-
latitude : 24.20645016,24.2064495
Longitude : 88.5341934,88.53419203
file name : Image_25032022164216708.png
|
2022-03-25 16:42:16.807162 |
57 |
34650220 |
Construction of Toilet Homeo Health Center at village Kalinagar Mirpara |
60000 |
Construction of Toilet Homeo Health Center at village Kalinagar Mirpara1 |
Roof laid |
-
latitude : 24.22811132
Longitude : 88.53350147
file name : Image_31052023115208849.png
|
2023-05-31 11:52:08.951143 |
58 |
34650220 |
Construction of Toilet Homeo Health Center at village Kalinagar Mirpara |
60000 |
Construction of Toilet Homeo Health Center at village Kalinagar Mirpara1 |
Plinth level |
-
latitude : 24.22086089
Longitude : 88.5396941
file name : Image_30052023132958524.png
|
2023-05-30 13:29:58.610126 |
59 |
34650220 |
Construction of Toilet Homeo Health Center at village Kalinagar Mirpara |
60000 |
Construction of Toilet Homeo Health Center at village Kalinagar Mirpara1 |
Completion of work |
-
latitude : 24.26571796
Longitude : 88.4967806
file name : Image_06072021133010991.png
|
2021-07-06 13:30:11.076865 |
60 |
34652817 |
Construction of Pucca Drain from h o Golam Hossain to h o Fari Sekh K M Para |
350000 |
Construction of Pucca Drain from h o Golam Hossain to h o Fari Sekh K M Para1 |
Roof laid |
-
latitude : 24.23243348,24.23243352
Longitude : 88.52654331,88.52654328
file name : Image_31052023114638243.png
|
2023-05-31 11:46:38.334646 |
61 |
34652817 |
Construction of Pucca Drain from h o Golam Hossain to h o Fari Sekh K M Para |
350000 |
Construction of Pucca Drain from h o Golam Hossain to h o Fari Sekh K M Para1 |
Plinth level |
-
latitude : 24.23247744,24.23247748
Longitude : 88.52646421,88.52646417
file name : Image_30052023135257054.png
|
2023-05-30 13:52:57.153604 |
62 |
34652817 |
Construction of Pucca Drain from h o Golam Hossain to h o Fari Sekh K M Para |
350000 |
Construction of Pucca Drain from h o Golam Hossain to h o Fari Sekh K M Para1 |
Completion of work |
-
latitude : 24.23262925,24.23241924
Longitude : 88.52680954,88.52664412
file name : Image_23032021114413605.png
|
2021-03-23 11:44:13.717239 |
63 |
39083031 |
Construction of Pucca Drain from Bablabona More to ho Namaji at Village Bablabona |
350000 |
Construction of Pucca Drain from Bablabona More to ho Namaji at Village Bablabona1 |
Roof laid |
-
latitude : 24.2440097,24.2440097
Longitude : 88.5257733,88.5257733
file name : Image_31052023114601507.png
|
2023-05-31 11:46:01.604254 |
64 |
39083031 |
Construction of Pucca Drain from Bablabona More to ho Namaji at Village Bablabona |
350000 |
Construction of Pucca Drain from Bablabona More to ho Namaji at Village Bablabona1 |
Plinth level |
-
latitude : 24.2440097,24.2440097
Longitude : 88.5257746,88.5257746
file name : Image_30052023140611313.png
|
2023-05-30 14:06:11.398551 |
65 |
39083031 |
Construction of Pucca Drain from Bablabona More to ho Namaji at Village Bablabona |
350000 |
Construction of Pucca Drain from Bablabona More to ho Namaji at Village Bablabona1 |
Completion of work |
-
latitude : 24.24391217,24.24392996
Longitude : 88.52576042,88.52573908
file name : Image_06072021132813846.png
|
2021-07-06 13:28:13.930787 |
66 |
39083081 |
Construction of Pucca Drain from ho Namaji to ho Manik at village Bablabona |
350000 |
Construction of Pucca Drain from ho Namaji to ho Manik at village Bablabona1 |
Roof laid |
-
latitude : 24.24414836,24.24414086
Longitude : 88.52622977,88.52622773
file name : Image_31052023113224029.png
|
2023-05-31 11:32:24.118954 |
67 |
39083081 |
Construction of Pucca Drain from ho Namaji to ho Manik at village Bablabona |
350000 |
Construction of Pucca Drain from ho Namaji to ho Manik at village Bablabona1 |
Plinth level |
-
latitude : 24.24426131,24.24426698
Longitude : 88.52620503,88.52620211
file name : Image_30052023140934846.png
|
2023-05-30 14:09:34.934182 |
68 |
39083081 |
Construction of Pucca Drain from ho Namaji to ho Manik at village Bablabona |
350000 |
Construction of Pucca Drain from ho Namaji to ho Manik at village Bablabona1 |
Completion of work |
-
latitude : 24.24447989,24.24449066
Longitude : 88.52679464,88.52680421
file name : Image_06072021133014917.png
|
2021-07-06 13:30:15.015567 |
69 |
47401292 |
Construction of Pucca Drain from house of Sujauddin to Baidul More At Village Kalinagar Mirpara |
584585 |
Construction of Pucca Drain from house of Sujauddin to Baidul More At Village Kalinagar Mirpara1 |
Roof laid |
-
latitude : 24.22807964,24.22807958
Longitude : 88.53358419,88.53358387
file name : Image_31052023114839618.png
|
2023-05-31 11:48:39.703967 |
70 |
47401292 |
Construction of Pucca Drain from house of Sujauddin to Baidul More At Village Kalinagar Mirpara |
584585 |
Construction of Pucca Drain from house of Sujauddin to Baidul More At Village Kalinagar Mirpara1 |
Plinth level |
-
latitude : 24.22804992,24.22804357
Longitude : 88.53354567,88.53356127
file name : Image_30052023133453438.png
|
2023-05-30 13:34:53.513893 |
71 |
47401292 |
Construction of Pucca Drain from house of Sujauddin to Baidul More At Village Kalinagar Mirpara |
584585 |
Construction of Pucca Drain from house of Sujauddin to Baidul More At Village Kalinagar Mirpara1 |
Completion of work |
-
latitude : 24.22800225,24.22800373
Longitude : 88.53364599,88.53364471
file name : Image_29032022134327739.png
|
2022-03-29 13:43:27.851416 |
72 |
67198347 |
Installation of Public Information Board (PIB) |
5000 |
Installation of Public Information Board (PIB)1 |
Roof laid |
-
latitude : 24.2250748
Longitude : 88.5452866
file name : Image_30122023122452594.png
|
2023-12-30 12:24:52.579701 |
73 |
67198347 |
Installation of Public Information Board (PIB) |
5000 |
Installation of Public Information Board (PIB)1 |
Plinth level |
-
latitude : 24.2250746
Longitude : 88.5452875
file name : Image_30122023121928903.png
|
2023-12-30 12:19:28.988501 |
74 |
67198347 |
Installation of Public Information Board (PIB) |
5000 |
Installation of Public Information Board (PIB)1 |
Completion of work |
-
latitude : 24.2250741
Longitude : 88.5452869
file name : Image_30122023121647960.png
|
2023-12-30 12:16:48.042255 |
75 |
70319482 |
Greywater management system |
300000 |
Greywater management system1 |
Roof laid |
-
latitude : 24.25975266
Longitude : 88.52780563
file name : Image_30012024155621558.png
|
2024-01-30 15:56:21.686404 |
76 |
70319482 |
Greywater management system |
300000 |
Greywater management system1 |
Plinth level |
-
latitude : 24.25975849
Longitude : 88.52775418
file name : Image_05012024140149792.png
|
2024-01-05 14:01:49.888355 |
77 |
70319482 |
Greywater management system |
300000 |
Greywater management system1 |
Completion of work |
-
latitude : 24.25951107
Longitude : 88.52757648
file name : Image_05012024135834941.png
|
2024-01-05 13:58:35.031128 |
78 |
67149328 |
Grey Water management- collection infrastructure |
100000 |
Grey Water management- collection infrastructure1 |
Plinth level |
-
latitude : 24.19785383
Longitude : 88.53464827
file name : Image_16012024123818160.png
|
2024-01-16 12:38:18.249767 |
79 |
67149328 |
Grey Water management- collection infrastructure |
100000 |
Grey Water management- collection infrastructure1 |
Completion of work |
-
latitude : 24.19790242
Longitude : 88.53460036
file name : Image_16012024123026353.png
|
2024-01-16 12:30:26.448137 |
80 |
67149328 |
Grey Water management- collection infrastructure |
100000 |
Grey Water management- collection infrastructure1 |
Plinth level |
-
latitude : 24.19785714
Longitude : 88.53465143
file name : Image_16012024123853969.png
|
2024-01-16 12:38:54.072841 |
81 |
67149328 |
Grey Water management- collection infrastructure |
100000 |
Grey Water management- collection infrastructure1 |
Completion of work |
-
latitude : 24.19790033
Longitude : 88.53459945
file name : Image_16012024123045922.png
|
2024-01-16 12:30:46.017082 |
82 |
67149328 |
Grey Water management- collection infrastructure |
100000 |
Grey Water management- collection infrastructure1 |
Completion of work |
-
latitude : 24.19790033
Longitude : 88.53459945
file name : Image_16012024123029873.png
|
2024-01-16 12:30:29.968337 |
83 |
67149328 |
Grey Water management- collection infrastructure |
100000 |
Grey Water management- collection infrastructure1 |
Plinth level |
-
latitude : 24.19786688
Longitude : 88.53464927
file name : Image_16012024123926690.png
|
2024-01-16 12:39:26.784281 |
84 |
67149328 |
Grey Water management- collection infrastructure |
100000 |
Grey Water management- collection infrastructure1 |
Completion of work |
-
latitude : 24.19789907
Longitude : 88.53459885
file name : Image_16012024123049438.png
|
2024-01-16 12:30:49.528382 |
85 |
67149328 |
Grey Water management- collection infrastructure |
100000 |
Grey Water management- collection infrastructure1 |
Completion of work |
-
latitude : 24.19789907
Longitude : 88.53459885
file name : Image_16012024123033697.png
|
2024-01-16 12:30:33.784523 |
86 |
67149328 |
Grey Water management- collection infrastructure |
100000 |
Grey Water management- collection infrastructure1 |
Plinth level |
-
latitude : 24.1974751
Longitude : 88.534012
file name : Image_16012024124011834.png
|
2024-01-16 12:40:11.923107 |
87 |
67149328 |
Grey Water management- collection infrastructure |
100000 |
Grey Water management- collection infrastructure1 |
Completion of work |
-
latitude : 24.1974783
Longitude : 88.534013
file name : Image_16012024123053198.png
|
2024-01-16 12:30:53.288571 |
88 |
67149328 |
Grey Water management- collection infrastructure |
100000 |
Grey Water management- collection infrastructure1 |
Completion of work |
-
latitude : 24.1974783
Longitude : 88.534013
file name : Image_16012024123038286.png
|
2024-01-16 12:30:38.376517 |
89 |
67149328 |
Grey Water management- collection infrastructure |
100000 |
Grey Water management- collection infrastructure1 |
Plinth level |
-
latitude : 24.19788991
Longitude : 88.53462958
file name : Image_16012024124046654.png
|
2024-01-16 12:40:46.752166 |
90 |
67149328 |
Grey Water management- collection infrastructure |
100000 |
Grey Water management- collection infrastructure1 |
Completion of work |
-
latitude : 24.1974783
Longitude : 88.534013
file name : Image_16012024123100295.png
|
2024-01-16 12:31:00.380515 |
91 |
67149328 |
Grey Water management- collection infrastructure |
100000 |
Grey Water management- collection infrastructure1 |
Completion of work |
-
latitude : 24.1974783
Longitude : 88.534013
file name : Image_16012024123042204.png
|
2024-01-16 12:30:42.294633 |
92 |
67150278 |
Construction of roads |
350000 |
Construction of roads1 |
Roof laid |
-
latitude : 24.22924107,24.22924391
Longitude : 88.5449415,88.54493977
file name : Image_25012024151618214.png
|
2024-01-25 15:16:18.305631 |
93 |
67150278 |
Construction of roads |
350000 |
Construction of roads1 |
Plinth level |
-
latitude : 24.22921845,24.22921845
Longitude : 88.54491408,88.54491355
file name : Image_25012024151218425.png
|
2024-01-25 15:12:18.519512 |
94 |
67150278 |
Construction of roads |
350000 |
Construction of roads1 |
Completion of work |
-
latitude : 24.22930724,24.22931534
Longitude : 88.54498799,88.54499752
file name : Image_25012024150816505.png
|
2024-01-25 15:08:16.608181 |
95 |
67039151 |
Computer in GP Bhawan |
250000 |
Computer in GP Bhawan1 |
Roof laid |
-
latitude : 24.2250205
Longitude : 88.545309
file name : Image_07072024122149695.png
|
2024-07-07 12:21:49.795503 |
96 |
67039151 |
Computer in GP Bhawan |
250000 |
Computer in GP Bhawan1 |
Plinth level |
-
latitude : 24.2250838
Longitude : 88.5452588
file name : Image_08122023180449661.png
|
2023-12-08 18:04:49.750107 |
97 |
67039151 |
Computer in GP Bhawan |
250000 |
Computer in GP Bhawan1 |
Completion of work |
-
latitude : 24.2250636
Longitude : 88.5452477
file name : Image_04122023160314853.png
|
2023-12-04 16:03:14.946126 |
98 |
67039443 |
Internet in GP Bhawan |
48000 |
Internet in GP Bhawan1 |
Roof laid |
-
latitude : 24.2250798
Longitude : 88.5453096
file name : Image_29082024132433959.png
|
2024-08-29 13:24:34.384954 |
99 |
67039443 |
Internet in GP Bhawan |
48000 |
Internet in GP Bhawan1 |
Plinth level |
-
latitude : 24.2250847
Longitude : 88.5452832
file name : Image_09012024150849752.png
|
2024-01-09 15:08:49.837529 |
100 |
67039443 |
Internet in GP Bhawan |
48000 |
Internet in GP Bhawan1 |
Completion of work |
-
latitude : 24.2250728
Longitude : 88.5452481
file name : Image_04122023160435358.png
|
2023-12-04 16:04:35.436496 |
101 |
67039324 |
Electricity in GP Bhawan |
60000 |
Electricity in GP Bhawan1 |
Roof laid |
-
latitude : 24.2250229
Longitude : 88.5453088
file name : Image_04072024164552992.png
|
2024-07-04 16:45:53.077014 |
102 |
67039324 |
Electricity in GP Bhawan |
60000 |
Electricity in GP Bhawan1 |
Plinth level |
-
latitude : 24.2250797
Longitude : 88.5452552
file name : Image_08122023182558147.png
|
2023-12-08 18:25:58.227986 |
103 |
67039324 |
Electricity in GP Bhawan |
60000 |
Electricity in GP Bhawan1 |
Completion of work |
-
latitude : 24.2251419
Longitude : 88.5452953
file name : Image_08122023161116724.png
|
2023-12-08 16:11:16.857691 |
104 |
70325463 |
Greywater management system |
1166667 |
Greywater management system1 |
Roof laid |
-
latitude : 24.24576906
Longitude : 88.52995607
file name : Image_15022024131112912.png
|
2024-02-15 13:11:12.984221 |
105 |
70325463 |
Greywater management system |
1166667 |
Greywater management system1 |
Plinth level |
-
latitude : 24.24577435
Longitude : 88.52995752
file name : Image_15022024130728828.png
|
2024-02-15 13:07:28.899287 |
106 |
70325463 |
Greywater management system |
1166667 |
Greywater management system1 |
Completion of work |
-
latitude : 24.24584487
Longitude : 88.52990035
file name : Image_15022024130129632.png
|
2024-02-15 13:01:29.730461 |
107 |
70316182 |
Greywater management system |
1120049 |
Greywater management system1 |
Roof laid |
-
latitude : 24.2249123
Longitude : 88.5442419
file name : Image_15022024132820408.png
|
2024-02-15 13:28:20.491739 |
108 |
70316182 |
Greywater management system |
1120049 |
Greywater management system1 |
Plinth level |
-
latitude : 24.22652331
Longitude : 88.54396342
file name : Image_15022024132504932.png
|
2024-02-15 13:25:05.019356 |
109 |
70316182 |
Greywater management system |
1120049 |
Greywater management system1 |
Completion of work |
-
latitude : 24.2249123
Longitude : 88.5442408
file name : Image_15022024132208749.png
|
2024-02-15 13:22:08.836686 |
110 |
67039042 |
Installation of Information Board |
10000 |
Installation of Information Board1 |
Roof laid |
-
latitude : 24.2250837
Longitude : 88.5452767
file name : Image_18122023153326417.png
|
2023-12-18 15:33:26.696568 |
111 |
67039042 |
Installation of Information Board |
10000 |
Installation of Information Board1 |
Plinth level |
-
latitude : 24.2250841
Longitude : 88.5452759
file name : Image_18122023152046767.png
|
2023-12-18 15:20:46.885553 |
112 |
67039042 |
Installation of Information Board |
10000 |
Installation of Information Board1 |
Completion of work |
-
latitude : 24.2250933
Longitude : 88.5452879
file name : Image_18122023131913427.png
|
2023-12-18 13:19:13.610371 |
113 |
57021057 |
Construction of BT road from ho Bainuddin to ho Bujhan at Bablabona |
760000 |
Construction of BT road from ho Bainuddin to ho Bujhan at Bablabona1 |
Roof laid |
-
latitude : 24.2479778,24.2479778
Longitude : 88.5228298,88.5228298
file name : Image_24122023134306643.png
|
2023-12-24 13:43:06.400885 |
114 |
57021057 |
Construction of BT road from ho Bainuddin to ho Bujhan at Bablabona |
760000 |
Construction of BT road from ho Bainuddin to ho Bujhan at Bablabona1 |
Plinth level |
-
latitude : 24.24747047,24.2479782
Longitude : 88.52341478,88.5228371
file name : Image_18122023150701030.png
|
2023-12-18 15:07:01.115182 |
115 |
57021057 |
Construction of BT road from ho Bainuddin to ho Bujhan at Bablabona |
760000 |
Construction of BT road from ho Bainuddin to ho Bujhan at Bablabona1 |
Completion of work |
-
latitude : 24.24785256,24.247844
Longitude : 88.52309339,88.52309767
file name : Image_13042023144708576.png
|
2023-04-13 14:47:08.678247 |
116 |
57023191 |
Operation and Maintenance of BT and CC road through out GP Area |
120000 |
Operation and Maintenance of BT and CC road through out GP Area1 |
Roof laid |
-
latitude : 24.13090374,24.13090374
Longitude : 88.5444232,88.5444232
file name : Image_08012024110608629.png
|
2024-01-08 11:06:08.754131 |
117 |
57023191 |
Operation and Maintenance of BT and CC road through out GP Area |
120000 |
Operation and Maintenance of BT and CC road through out GP Area1 |
Plinth level |
-
latitude : 24.22634535,24.2263453
Longitude : 88.53394834,88.5339485
file name : Image_26122023122411613.png
|
2023-12-26 12:24:11.707648 |
118 |
57023191 |
Operation and Maintenance of BT and CC road through out GP Area |
120000 |
Operation and Maintenance of BT and CC road through out GP Area1 |
Completion of work |
-
latitude : 24.22634147,24.22629073
Longitude : 88.53382681,88.53375164
file name : Image_21122023114411458.png
|
2023-12-21 11:44:11.546113 |
119 |
56958560 |
Maintenance and cleaning of Drain all over GP area |
161231 |
Maintenance and cleaning of Drain all over GP area1 |
Roof laid |
-
latitude : 24.22043271
Longitude : 88.5377279
file name : Image_07072024124339153.png
|
2024-07-07 12:43:39.238221 |
120 |
56958560 |
Maintenance and cleaning of Drain all over GP area |
161231 |
Maintenance and cleaning of Drain all over GP area1 |
Plinth level |
-
latitude : 24.22033059
Longitude : 88.5375878
file name : Image_15012024152406872.png
|
2024-01-15 15:24:06.964607 |
121 |
56958560 |
Maintenance and cleaning of Drain all over GP area |
161231 |
Maintenance and cleaning of Drain all over GP area1 |
Completion of work |
-
latitude : 24.22033637
Longitude : 88.53760758
file name : Image_15012024151912896.png
|
2024-01-15 15:19:12.985664 |
122 |
56955558 |
Construction of PUcca Drain from ho Mantu Sk to ho Janmohammad Pond at Komnagar Uttar |
570000 |
Construction of PUcca Drain from ho Mantu Sk to ho Janmohammad Pond at Komnagar Uttar1 |
Roof laid |
-
latitude : 24.22694891,24.22694731
Longitude : 88.54398253,88.54398145
file name : Image_12072024172313347.png
|
2024-07-12 17:23:13.427756 |
123 |
56955558 |
Construction of PUcca Drain from ho Mantu Sk to ho Janmohammad Pond at Komnagar Uttar |
570000 |
Construction of PUcca Drain from ho Mantu Sk to ho Janmohammad Pond at Komnagar Uttar1 |
Plinth level |
-
latitude : 24.22696452,24.22692004
Longitude : 88.54402891,88.54400854
file name : Image_16052023142240928.png
|
2023-05-16 14:22:41.017307 |
124 |
56955558 |
Construction of PUcca Drain from ho Mantu Sk to ho Janmohammad Pond at Komnagar Uttar |
570000 |
Construction of PUcca Drain from ho Mantu Sk to ho Janmohammad Pond at Komnagar Uttar1 |
Completion of work |
-
latitude : 24.22691579,24.22691958
Longitude : 88.54399299,88.5439942
file name : Image_15052023161055696.png
|
2023-05-15 16:10:55.794185 |
125 |
67149980 |
Construction of roads |
334797 |
Construction of roads1 |
Roof laid |
-
latitude : 24.24911808,24.24911808
Longitude : 88.52171133,88.52171133
file name : Image_29082024130834961.png
|
2024-08-29 13:08:35.152982 |
126 |
67149980 |
Construction of roads |
334797 |
Construction of roads1 |
Plinth level |
-
latitude : 24.24915757,24.24915746
Longitude : 88.52178624,88.52178645
file name : Image_16072024172853531.png
|
2024-07-16 17:28:54.059611 |
127 |
67149980 |
Construction of roads |
334797 |
Construction of roads1 |
Completion of work |
-
latitude : 24.24920939,24.24920939
Longitude : 88.52173278,88.52173278
file name : Image_16072024172434282.png
|
2024-07-16 17:24:34.374941 |
128 |
67040937 |
Creation of a new source of drinking water |
547666 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.20930821
Longitude : 88.53788377
file name : Image_29072024121015527.png
|
2024-07-29 12:10:15.627154 |
129 |
67040937 |
Creation of a new source of drinking water |
547666 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.20934762
Longitude : 88.53790672
file name : Image_18072024160607680.png
|
2024-07-18 16:06:07.769259 |
130 |
67040937 |
Creation of a new source of drinking water |
547666 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.20938853
Longitude : 88.53780468
file name : Image_18072024155509777.png
|
2024-07-18 15:55:09.871362 |
131 |
67040222 |
Creation of a new source of drinking water |
211727 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 24.25523225
Longitude : 88.53921333
file name : Image_22072024134523967.png
|
2024-07-22 13:45:24.059991 |
132 |
67040222 |
Creation of a new source of drinking water |
211727 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 24.25523225
Longitude : 88.53921333
file name : Image_22072024133743209.png
|
2024-07-22 13:37:43.29274 |
133 |
67040222 |
Creation of a new source of drinking water |
211727 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 24.26585077
Longitude : 88.49685947
file name : Image_22072024132538471.png
|
2024-07-22 13:25:38.556086 |