1 |
35259937 |
Upgradation of C C road from house of Santosh Biswas to Beni Sikdar |
104000 |
Upgradation of C C road from house of Santosh Biswas to Beni Sikdar 1 |
Roof laid |
-
latitude : 23.038773187436163,23.03870160598308,23.038600143045187
Longitude : 88.6858366895467,88.6858303193003,88.68582621216774
file name : Image_09122023150007393.png
|
2023-12-09 15:00:07.484493 |
2 |
35259937 |
Upgradation of C C road from house of Santosh Biswas to Beni Sikdar |
104000 |
Upgradation of C C road from house of Santosh Biswas to Beni Sikdar 1 |
Plinth level |
-
latitude : 23.03874741308391,23.038723482750356
Longitude : 88.68582420051098,88.68582042865455
file name : Image_09082021111801251.png
|
2021-08-09 11:18:01.33706 |
3 |
35259937 |
Upgradation of C C road from house of Santosh Biswas to Beni Sikdar |
104000 |
Upgradation of C C road from house of Santosh Biswas to Beni Sikdar 1 |
Plinth level |
-
latitude : 23.038721135817468,23.03866740781814
Longitude : 88.68585462681949,88.6858493462205
file name : Image_06082021170858800.png
|
2021-08-06 17:08:58.866644 |
4 |
35259937 |
Upgradation of C C road from house of Santosh Biswas to Beni Sikdar |
104000 |
Upgradation of C C road from house of Santosh Biswas to Beni Sikdar 1 |
Completion of work |
-
latitude : 23.038736055605114,23.03867620881647
Longitude : 88.68581070564687,88.68581506423652
file name : Image_05082021105004645.png
|
2021-08-05 10:50:04.757318 |
5 |
65997175 |
Operation & maintenance of drinking water supply system |
100000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.0376321
Longitude : 88.6778355
file name : Image_14122022142421942.png
|
2022-12-14 14:24:22.040649 |
6 |
65997175 |
Operation & maintenance of drinking water supply system |
100000 |
Operation & maintenance of drinking water supply system11 |
Completion of work |
-
latitude : 23.037278149276972
Longitude : 88.67820211686194
file name : Image_14122022142708835.png
|
2022-12-14 14:27:08.924798 |
7 |
46908339 |
Construction of concrete road from Sitalatala towards Srinagar cotching center at Srinagar |
238602 |
Construction of concrete road from Sitalatala towards Srinagar cotching center at Srinagar1 |
Roof laid |
-
latitude : 23.01056459,23.01056459,23.01056459
Longitude : 88.61496469,88.61496469,88.61496469
file name : Image_28032022123928630.png
|
2022-03-28 12:39:28.732336 |
8 |
46908339 |
Construction of concrete road from Sitalatala towards Srinagar cotching center at Srinagar |
238602 |
Construction of concrete road from Sitalatala towards Srinagar cotching center at Srinagar1 |
Roof laid |
-
latitude : 23.0470563,23.04691335
Longitude : 88.6743992,88.67493375
file name : Image_28032022112555805.png
|
2022-03-28 11:25:55.905524 |
9 |
46908339 |
Construction of concrete road from Sitalatala towards Srinagar cotching center at Srinagar |
238602 |
Construction of concrete road from Sitalatala towards Srinagar cotching center at Srinagar1 |
Roof laid |
-
latitude : 23.0470519,23.0470519,23.0470519
Longitude : 88.6743993,88.6743993,88.6743993
file name : Image_28032022112552622.png
|
2022-03-28 11:25:52.733932 |
10 |
46908339 |
Construction of concrete road from Sitalatala towards Srinagar cotching center at Srinagar |
238602 |
Construction of concrete road from Sitalatala towards Srinagar cotching center at Srinagar1 |
Roof laid |
-
latitude : 23.04688273,23.04688307,23.0468831
Longitude : 88.67491695,88.67491681,88.67491679
file name : Image_28032022123932828.png
|
2022-03-28 12:39:32.931609 |
11 |
46908339 |
Construction of concrete road from Sitalatala towards Srinagar cotching center at Srinagar |
238602 |
Construction of concrete road from Sitalatala towards Srinagar cotching center at Srinagar1 |
Completion of work |
-
latitude : 23.04688896,23.04688899
Longitude : 88.67495269,88.67495269
file name : Image_17032022145834935.png
|
2022-03-17 14:58:35.058178 |
12 |
46908339 |
Construction of concrete road from Sitalatala towards Srinagar cotching center at Srinagar |
238602 |
Construction of concrete road from Sitalatala towards Srinagar cotching center at Srinagar1 |
Completion of work |
-
latitude : 23.04688896,23.04688899
Longitude : 88.67495269,88.67495269
file name : Image_17032022145838702.png
|
2022-03-17 14:58:38.816178 |
13 |
46908339 |
Construction of concrete road from Sitalatala towards Srinagar cotching center at Srinagar |
238602 |
Construction of concrete road from Sitalatala towards Srinagar cotching center at Srinagar1 |
Plinth level |
-
latitude : 23.04688401,23.04688389
Longitude : 88.67494704,88.67494707
file name : Image_21032022135452650.png
|
2022-03-21 13:54:52.761568 |
14 |
46908339 |
Construction of concrete road from Sitalatala towards Srinagar cotching center at Srinagar |
238602 |
Construction of concrete road from Sitalatala towards Srinagar cotching center at Srinagar1 |
Roof laid |
-
latitude : 23.0470565,23.0470563,23.0470563
Longitude : 88.674398,88.6743992,88.6743992
file name : Image_21032022151534702.png
|
2022-03-21 15:15:34.797065 |
15 |
64897490 |
Construction of toilets in public institutions |
153375 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.037700848653913
Longitude : 88.67787547409534
file name : Image_21082024194013417.png
|
2024-08-21 19:40:13.507996 |
16 |
64897490 |
Construction of toilets in public institutions |
153375 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.0376164
Longitude : 88.6777966
file name : Image_15042023174548705.png
|
2023-04-15 17:45:48.811666 |
17 |
64897490 |
Construction of toilets in public institutions |
153375 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.037617
Longitude : 88.677802
file name : Image_15042023174426353.png
|
2023-04-15 17:44:26.450724 |
18 |
64897490 |
Construction of toilets in public institutions |
153375 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.0376254
Longitude : 88.6778953
file name : Image_06122023120531462.png
|
2023-12-06 12:05:31.55443 |
19 |
64897490 |
Construction of toilets in public institutions |
153375 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.0376168
Longitude : 88.6778016
file name : Image_14042023172412533.png
|
2023-04-14 17:24:12.615359 |
20 |
64897377 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.0376171
Longitude : 88.6778038
file name : Image_26042023143013482.png
|
2023-04-26 14:30:13.651253 |
21 |
64897377 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.0376165
Longitude : 88.6778042
file name : Image_26042023140341429.png
|
2023-04-26 14:03:41.553747 |
22 |
59259299 |
construction of cc road from the h/o Asit Samajdar towards h/o tarun Roy at Samajdarpara. |
150000 |
construction of cc road from the h/o Asit Samajdar towards h/o tarun Roy at Samajdarpara.1 |
Roof laid |
-
latitude : 23.0376061,23.0376056
Longitude : 88.6778409,88.6778405
file name : Image_21082024174631472.png
|
2024-08-21 17:46:31.555367 |
23 |
59259299 |
construction of cc road from the h/o Asit Samajdar towards h/o tarun Roy at Samajdarpara. |
150000 |
construction of cc road from the h/o Asit Samajdar towards h/o tarun Roy at Samajdarpara.1 |
Plinth level |
-
latitude : 23.028041166253388,23.028016230091453
Longitude : 88.66697128862143,88.66694957949221
file name : Image_06062023124738960.png
|
2023-06-06 12:47:39.050913 |
24 |
59259299 |
construction of cc road from the h/o Asit Samajdar towards h/o tarun Roy at Samajdarpara. |
150000 |
construction of cc road from the h/o Asit Samajdar towards h/o tarun Roy at Samajdarpara.1 |
Completion of work |
-
latitude : 23.02799238357693,23.02795919124037
Longitude : 88.66702216677368,88.66698612459004
file name : Image_26052023142829423.png
|
2023-05-26 14:28:29.530697 |
25 |
75634923 |
construction of black top road from ho pannalal thakur to ho shaymal sarkar at rajarmath |
189460 |
construction of black top road from ho pannalal thakur to ho shaymal sarkar at rajarmath1 |
Roof laid |
-
latitude : 23.03764925803989,23.037653993815184
Longitude : 88.67795510217547,88.6779520008713
file name : Image_21082024192559107.png
|
2024-08-21 19:25:59.186271 |
26 |
75634923 |
construction of black top road from ho pannalal thakur to ho shaymal sarkar at rajarmath |
189460 |
construction of black top road from ho pannalal thakur to ho shaymal sarkar at rajarmath1 |
Plinth level |
-
latitude : 23.03769682534039,23.03769481368363
Longitude : 88.67782970890403,88.6778291221708
file name : Image_21082024192248523.png
|
2024-08-21 19:22:48.602897 |
27 |
75634923 |
construction of black top road from ho pannalal thakur to ho shaymal sarkar at rajarmath |
189460 |
construction of black top road from ho pannalal thakur to ho shaymal sarkar at rajarmath1 |
Completion of work |
-
latitude : 23.015209478326142,23.015209478326142,23.015200928784907
Longitude : 88.6774963606149,88.6775013897568,88.6775169800967
file name : Image_06122023152621427.png
|
2023-12-06 15:26:21.514939 |
28 |
75634923 |
construction of black top road from ho pannalal thakur to ho shaymal sarkar at rajarmath |
189460 |
construction of black top road from ho pannalal thakur to ho shaymal sarkar at rajarmath1 |
Completion of work |
-
latitude : 23.015132364816964,23.015130353160203
Longitude : 88.67747465148568,88.67749518714845
file name : Image_05072023131653446.png
|
2023-07-05 13:16:53.550475 |
29 |
84148692 |
Grey water management — treatment and reuse infrastructure |
966094 |
Grey water management — treatment and reuse infrastructure1 |
Roof laid |
-
latitude : 23.035319508053362
Longitude : 88.68191697634757
file name : Image_25062024163012762.png
|
2024-06-25 16:30:12.86745 |
30 |
84148692 |
Grey water management — treatment and reuse infrastructure |
966094 |
Grey water management — treatment and reuse infrastructure1 |
Roof laid |
-
latitude : 23.03529645781964
Longitude : 88.68185637518764
file name : Image_15012024151352106.png
|
2024-01-15 15:13:52.202431 |
31 |
84148692 |
Grey water management — treatment and reuse infrastructure |
966094 |
Grey water management — treatment and reuse infrastructure1 |
Roof laid |
-
latitude : 23.035323950462043
Longitude : 88.68190473876894
file name : Image_15012024151236808.png
|
2024-01-15 15:12:36.910785 |
32 |
84148692 |
Grey water management — treatment and reuse infrastructure |
966094 |
Grey water management — treatment and reuse infrastructure1 |
Plinth level |
-
latitude : 23.03529968485236
Longitude : 88.68187732994556
file name : Image_15012024145957813.png
|
2024-01-15 14:59:57.904165 |
33 |
84148692 |
Grey water management — treatment and reuse infrastructure |
966094 |
Grey water management — treatment and reuse infrastructure1 |
Completion of work |
-
latitude : 23.035345491953194
Longitude : 88.68186224251986
file name : Image_15012024143548750.png
|
2024-01-15 14:35:48.828133 |
34 |
84148692 |
Grey water management — treatment and reuse infrastructure |
966094 |
Grey water management — treatment and reuse infrastructure1 |
Completion of work |
-
latitude : 23.03531569428742
Longitude : 88.68188478983939
file name : Image_15012024143545829.png
|
2024-01-15 14:35:45.907895 |
35 |
35240440 |
Construction of C C road from the house of I Choudhury to N Ghosh |
200000 |
Construction of C C road from the house of I Choudhury to N Ghosh 1 |
Roof laid |
-
latitude : 23.047101236879826,23.047135854139924,23.047183169983327
Longitude : 88.68079539388418,88.68081333115697,88.68084585294127
file name : Image_09122023143636606.png
|
2023-12-09 14:36:36.694102 |
36 |
35240440 |
Construction of C C road from the house of I Choudhury to N Ghosh |
200000 |
Construction of C C road from the house of I Choudhury to N Ghosh 1 |
Plinth level |
-
latitude : 23.047057734802365,23.04710563737899
Longitude : 88.68081810884178,88.68082447908819
file name : Image_09082021102123289.png
|
2021-08-09 10:21:23.362025 |
37 |
35240440 |
Construction of C C road from the house of I Choudhury to N Ghosh |
200000 |
Construction of C C road from the house of I Choudhury to N Ghosh 1 |
Plinth level |
-
latitude : 23.047056603245437,23.047094489447773
Longitude : 88.68089145049453,88.68086739443243
file name : Image_06082021162300695.png
|
2021-08-06 16:23:00.780127 |
38 |
35240440 |
Construction of C C road from the house of I Choudhury to N Ghosh |
200000 |
Construction of C C road from the house of I Choudhury to N Ghosh 1 |
Completion of work |
-
latitude : 23.04705019108951,23.04711456410587
Longitude : 88.68086035363376,88.68085783906281
file name : Image_05082021110654506.png
|
2021-08-05 11:06:54.572067 |
39 |
35240440 |
Construction of C C road from the house of I Choudhury to N Ghosh |
200000 |
Construction of C C road from the house of I Choudhury to N Ghosh 1 |
Completion of work |
-
latitude : 23.04705019108951,23.04711456410587
Longitude : 88.68086035363376,88.68085783906281
file name : Image_05082021110701246.png
|
2021-08-05 11:07:01.309921 |
40 |
35259623 |
Upgradation of C C road from house of Chhobi Biswas to house of Santosh Biswas |
81000 |
Upgradation of C C road from house of Chhobi Biswas to house of Santosh Biswas 1 |
Roof laid |
-
latitude : 23.0383516,23.0383516,23.0383516
Longitude : 88.68632,88.68632,88.68632
file name : Image_09122023150246734.png
|
2023-12-09 15:02:46.826316 |
41 |
35259623 |
Upgradation of C C road from house of Chhobi Biswas to house of Santosh Biswas |
81000 |
Upgradation of C C road from house of Chhobi Biswas to house of Santosh Biswas 1 |
Plinth level |
-
latitude : 23.038331209681928,23.038362809456885
Longitude : 88.68632267229259,88.68628562428057
file name : Image_09082021111925591.png
|
2021-08-09 11:19:25.679435 |
42 |
35259623 |
Upgradation of C C road from house of Chhobi Biswas to house of Santosh Biswas |
81000 |
Upgradation of C C road from house of Chhobi Biswas to house of Santosh Biswas 1 |
Plinth level |
-
latitude : 23.038347512483597,23.038347009569407
Longitude : 88.68639442138374,88.6863240133971
file name : Image_06082021171043919.png
|
2021-08-06 17:10:43.986944 |
43 |
35259623 |
Upgradation of C C road from house of Chhobi Biswas to house of Santosh Biswas |
81000 |
Upgradation of C C road from house of Chhobi Biswas to house of Santosh Biswas 1 |
Completion of work |
-
latitude : 23.038343782536685,23.03835576865822
Longitude : 88.68627657182515,88.68624773807824
file name : Image_05082021110650273.png
|
2021-08-05 11:06:50.334651 |
44 |
35242674 |
Upgradation of C C road from house of Tapan Roy to Asish Biswas at Ghoramara |
150000 |
Upgradation of C C road from house of Tapan Roy to Asish Biswas at Ghoramara 1 |
Roof laid |
-
latitude : 23.027224810793996,23.027187888510525,23.027147655375302
Longitude : 88.66629302501678,88.66628942079842,88.66627089679241
file name : Image_09122023132933339.png
|
2023-12-09 13:29:33.434276 |
45 |
35242674 |
Upgradation of C C road from house of Tapan Roy to Asish Biswas at Ghoramara |
150000 |
Upgradation of C C road from house of Tapan Roy to Asish Biswas at Ghoramara 1 |
Plinth level |
-
latitude : 23.02721202839166,23.027167939580977
Longitude : 88.66633753292263,88.66631708107889
file name : Image_09082021104819997.png
|
2021-08-09 10:48:20.084703 |
46 |
35242674 |
Upgradation of C C road from house of Tapan Roy to Asish Biswas at Ghoramara |
150000 |
Upgradation of C C road from house of Tapan Roy to Asish Biswas at Ghoramara 1 |
Plinth level |
-
latitude : 23.027187678962946,23.02715679164976
Longitude : 88.66630936972797,88.66630869917572
file name : Image_06082021163349466.png
|
2021-08-06 16:33:49.534646 |
47 |
35242674 |
Upgradation of C C road from house of Tapan Roy to Asish Biswas at Ghoramara |
150000 |
Upgradation of C C road from house of Tapan Roy to Asish Biswas at Ghoramara 1 |
Completion of work |
-
latitude : 23.02724488545209,23.02719564177096
Longitude : 88.66632889956236,88.66631255485117
file name : Image_05082021112703017.png
|
2021-08-05 11:27:03.096541 |
48 |
35233926 |
CC road from the House of R Sarkar to S Sarkar |
200000 |
CC road from the House of R Sarkar to S Sarkar1 |
Roof laid |
-
latitude : 23.058062712661922,23.058120380155742,23.058183873072267
Longitude : 88.66946247406304,88.66947311908007,88.66948225535452
file name : Image_09122023152746503.png
|
2023-12-09 15:27:46.596388 |
49 |
35233926 |
CC road from the House of R Sarkar to S Sarkar |
200000 |
CC road from the House of R Sarkar to S Sarkar1 |
Plinth level |
-
latitude : 23.0580102,23.0580102
Longitude : 88.6698054,88.6698054
file name : Image_09082021110402439.png
|
2021-08-09 11:04:02.498764 |
50 |
35233926 |
CC road from the House of R Sarkar to S Sarkar |
200000 |
CC road from the House of R Sarkar to S Sarkar1 |
Plinth level |
-
latitude : 23.0580103,23.0580113
Longitude : 88.6698089,88.6698106
file name : Image_06082021155911377.png
|
2021-08-06 15:59:11.471829 |
51 |
35233926 |
CC road from the House of R Sarkar to S Sarkar |
200000 |
CC road from the House of R Sarkar to S Sarkar1 |
Completion of work |
-
latitude : 23.0579987,23.05812587030232
Longitude : 88.6698084,88.66950706578791
file name : Image_25062021122504883.png
|
2021-06-25 12:25:04.965212 |
52 |
35241299 |
Upgradation of Cement Concrete road from house of B Moitra to J Sardar |
150000 |
Upgradation of Cement Concrete road from house of B Moitra to J Sardar1 |
Plinth level |
-
latitude : 23.04130653385073,23.0414078
Longitude : 88.67398937232792,88.6737677
file name : Image_09082021111108655.png
|
2021-08-09 11:11:08.722258 |
53 |
35241299 |
Upgradation of Cement Concrete road from house of B Moitra to J Sardar |
150000 |
Upgradation of Cement Concrete road from house of B Moitra to J Sardar1 |
Plinth level |
-
latitude : 23.0414051,23.0414095
Longitude : 88.6737698,88.6737663
file name : Image_06082021162350749.png
|
2021-08-06 16:23:50.821495 |
54 |
35241299 |
Upgradation of Cement Concrete road from house of B Moitra to J Sardar |
150000 |
Upgradation of Cement Concrete road from house of B Moitra to J Sardar1 |
Completion of work |
-
latitude : 23.0414099,23.0414099
Longitude : 88.673782,88.673782
file name : Image_09072021085326856.png
|
2021-07-09 08:53:26.940667 |
55 |
35241299 |
Upgradation of Cement Concrete road from house of B Moitra to J Sardar |
150000 |
Upgradation of Cement Concrete road from house of B Moitra to J Sardar1 |
Completion of work |
-
latitude : 23.0414103,23.0414079
Longitude : 88.6737754,88.6737771
file name : Image_09072021090135981.png
|
2021-07-09 09:01:36.070144 |
56 |
35241299 |
Upgradation of Cement Concrete road from house of B Moitra to J Sardar |
150000 |
Upgradation of Cement Concrete road from house of B Moitra to J Sardar1 |
Completion of work |
-
latitude : 23.041299493052065,23.041285537183285
Longitude : 88.67398585192859,88.67404829710722
file name : Image_05082021111212724.png
|
2021-08-05 11:12:12.802 |
57 |
35245328 |
Upgradation of C C road from house of Asit Samajdar to house of Kanchan Samajdar |
188851 |
Upgradation of C C road from house of Asit Samajdar to house of Kanchan Samajdar 1 |
Roof laid |
-
latitude : 23.028019163757563,23.02806958090514,23.028113963082433
Longitude : 88.66691672243178,88.66693750955164,88.66694966331124
file name : Image_09122023135646814.png
|
2023-12-09 13:56:46.901889 |
58 |
35245328 |
Upgradation of C C road from house of Asit Samajdar to house of Kanchan Samajdar |
188851 |
Upgradation of C C road from house of Asit Samajdar to house of Kanchan Samajdar 1 |
Plinth level |
-
latitude : 23.028841973282397,23.028789712116122
Longitude : 88.66721193306148,88.66718376986682
file name : Image_09082021105329859.png
|
2021-08-09 10:53:29.950065 |
59 |
35245328 |
Upgradation of C C road from house of Asit Samajdar to house of Kanchan Samajdar |
188851 |
Upgradation of C C road from house of Asit Samajdar to house of Kanchan Samajdar 1 |
Plinth level |
-
latitude : 23.0288211023435,23.028753334656358
Longitude : 88.66719801910222,88.66717890836298
file name : Image_06082021163803207.png
|
2021-08-06 16:38:03.278173 |
60 |
35245328 |
Upgradation of C C road from house of Asit Samajdar to house of Kanchan Samajdar |
188851 |
Upgradation of C C road from house of Asit Samajdar to house of Kanchan Samajdar 1 |
Completion of work |
-
latitude : 23.02884536795318,23.028783006593585
Longitude : 88.66716826334596,88.66714294999838
file name : Image_05082021112141411.png
|
2021-08-05 11:21:41.495836 |
61 |
64897806 |
Construction of CC road from h/o Arun Dey to h/o Sukumar Durlav at Srinagar |
240000 |
Construction of CC road from h/o Arun Dey to h/o Sukumar Durlav at Srinagar1 |
Roof laid |
-
latitude : 23.04693799931556,23.046979741193354,23.047064021229744
Longitude : 88.67489084601402,88.67490635253489,88.67492269724607
file name : Image_09122023143019731.png
|
2023-12-09 14:30:19.832239 |
62 |
64897806 |
Construction of CC road from h/o Arun Dey to h/o Sukumar Durlav at Srinagar |
240000 |
Construction of CC road from h/o Arun Dey to h/o Sukumar Durlav at Srinagar1 |
Plinth level |
-
latitude : 23.046902208589017,23.04692232515663
Longitude : 88.67496091872454,88.67494457401335
file name : Image_31082022162655287.png
|
2022-08-31 16:26:55.385308 |
63 |
64897806 |
Construction of CC road from h/o Arun Dey to h/o Sukumar Durlav at Srinagar |
240000 |
Construction of CC road from h/o Arun Dey to h/o Sukumar Durlav at Srinagar1 |
Plinth level |
-
latitude : 23.046922995708883,23.04693586193025
Longitude : 88.67495597340167,88.67494926787913
file name : Image_31082022162542005.png
|
2022-08-31 16:25:42.102821 |
64 |
64897806 |
Construction of CC road from h/o Arun Dey to h/o Sukumar Durlav at Srinagar |
240000 |
Construction of CC road from h/o Arun Dey to h/o Sukumar Durlav at Srinagar1 |
Completion of work |
-
latitude : 23.046845253556967,23.046881589107215
Longitude : 88.67493602447212,88.67493736557662
file name : Image_31082022152828153.png
|
2022-08-31 15:28:28.249583 |
65 |
64897806 |
Construction of CC road from h/o Arun Dey to h/o Sukumar Durlav at Srinagar |
240000 |
Construction of CC road from h/o Arun Dey to h/o Sukumar Durlav at Srinagar1 |
Completion of work |
-
latitude : 23.046858203597367,23.04691645782441
Longitude : 88.67495823651552,88.6749521177262
file name : Image_31082022152823474.png
|
2022-08-31 15:28:23.568352 |
66 |
46962903 |
Construction of BT road from Champatala Club More towards H/O Shaymal Biswas at Champatala. |
129770 |
Construction of BT road from Champatala Club More towards H/O Shaymal Biswas at Champatala.1 |
Roof laid |
-
latitude : 23.05468937382102,23.054776838980615,23.054857808165252,23.05493412539363
Longitude : 88.67282839491963,88.67289494723082,88.67294238880277,88.6729805264622
file name : Image_09122023143853939.png
|
2023-12-09 14:38:54.036749 |
67 |
46962903 |
Construction of BT road from Champatala Club More towards H/O Shaymal Biswas at Champatala. |
129770 |
Construction of BT road from Champatala Club More towards H/O Shaymal Biswas at Champatala.1 |
Plinth level |
-
latitude : 23.05462555,23.05463856
Longitude : 88.67284757,88.6728736
file name : Image_31032022142126274.png
|
2022-03-31 14:21:26.377011 |
68 |
46962903 |
Construction of BT road from Champatala Club More towards H/O Shaymal Biswas at Champatala. |
129770 |
Construction of BT road from Champatala Club More towards H/O Shaymal Biswas at Champatala.1 |
Plinth level |
-
latitude : 23.05469678,23.05468563,23.05468977
Longitude : 88.67278851,88.67281704,88.67281509
file name : Image_21032022151538775.png
|
2022-03-21 15:15:38.897978 |
69 |
46962903 |
Construction of BT road from Champatala Club More towards H/O Shaymal Biswas at Champatala. |
129770 |
Construction of BT road from Champatala Club More towards H/O Shaymal Biswas at Champatala.1 |
Completion of work |
-
latitude : 23.05464063,23.0546347
Longitude : 88.6728129,88.67282419
file name : Image_21032022135455861.png
|
2022-03-21 13:54:56.090897 |
70 |
46967584 |
Construction of BT road from the H/O Chitttyaranjan Bain towards H/O Kamala Ghosh at Srirampur S |
129770 |
Construction of BT road from the H/O Chitttyaranjan Bain towards H/O Kamala Ghosh at Srirampur S1 |
Roof laid |
-
latitude : 23.03754531,23.03754531
Longitude : 88.67786781,88.67786781
file name : Image_21032022151512481.png
|
2022-03-21 15:15:12.569934 |
71 |
46967584 |
Construction of BT road from the H/O Chitttyaranjan Bain towards H/O Kamala Ghosh at Srirampur S |
129770 |
Construction of BT road from the H/O Chitttyaranjan Bain towards H/O Kamala Ghosh at Srirampur S1 |
Roof laid |
-
latitude : 23.03583977278322,23.035826152190566,23.035781853832304
Longitude : 88.67799458093941,88.67798301391304,88.67796717211604
file name : Image_09122023130157194.png
|
2023-12-09 13:01:57.291213 |
72 |
46967584 |
Construction of BT road from the H/O Chitttyaranjan Bain towards H/O Kamala Ghosh at Srirampur S |
129770 |
Construction of BT road from the H/O Chitttyaranjan Bain towards H/O Kamala Ghosh at Srirampur S1 |
Plinth level |
-
latitude : 23.0357977,23.03580255
Longitude : 88.67799755,88.67801421
file name : Image_21032022135513457.png
|
2022-03-21 13:55:13.573895 |
73 |
46967584 |
Construction of BT road from the H/O Chitttyaranjan Bain towards H/O Kamala Ghosh at Srirampur S |
129770 |
Construction of BT road from the H/O Chitttyaranjan Bain towards H/O Kamala Ghosh at Srirampur S1 |
Completion of work |
-
latitude : 23.03583838,23.03583186
Longitude : 88.67804168,88.67806617
file name : Image_17032022145825889.png
|
2022-03-17 14:58:26.021246 |
74 |
46967769 |
Construction of CC road from pacca rastha towards H/O Ashim Biswas at Srirampur South. |
129800 |
Construction of CC road from pacca rastha towards H/O Ashim Biswas at Srirampur South.1 |
Roof laid |
-
latitude : 23.03465129,23.03465384,23.03465836
Longitude : 88.67334913,88.67335665,88.67336065
file name : Image_21032022151557619.png
|
2022-03-21 15:15:57.705397 |
75 |
46967769 |
Construction of CC road from pacca rastha towards H/O Ashim Biswas at Srirampur South. |
129800 |
Construction of CC road from pacca rastha towards H/O Ashim Biswas at Srirampur South.1 |
Roof laid |
-
latitude : 23.03466139,23.03467368,23.03469301
Longitude : 88.67328681,88.67331543,88.67331476
file name : Image_21032022151553884.png
|
2022-03-21 15:15:53.970202 |
76 |
46967769 |
Construction of CC road from pacca rastha towards H/O Ashim Biswas at Srirampur South. |
129800 |
Construction of CC road from pacca rastha towards H/O Ashim Biswas at Srirampur South.1 |
Roof laid |
-
latitude : 23.034679465927184,23.0346803041175,23.034672760404646
Longitude : 88.67331395857036,88.67336961440742,88.67346843704581
file name : Image_09122023140807743.png
|
2023-12-09 14:08:07.832478 |
77 |
46967769 |
Construction of CC road from pacca rastha towards H/O Ashim Biswas at Srirampur South. |
129800 |
Construction of CC road from pacca rastha towards H/O Ashim Biswas at Srirampur South.1 |
Plinth level |
-
latitude : 23.03470227,23.03473647
Longitude : 88.67335229,88.67334481
file name : Image_21032022135510052.png
|
2022-03-21 13:55:10.166751 |
78 |
46967769 |
Construction of CC road from pacca rastha towards H/O Ashim Biswas at Srirampur South. |
129800 |
Construction of CC road from pacca rastha towards H/O Ashim Biswas at Srirampur South.1 |
Completion of work |
-
latitude : 23.03468356,23.03468356
Longitude : 88.67326006,88.67326006
file name : Image_17032022145830022.png
|
2022-03-17 14:58:30.14426 |
79 |
46911167 |
Construction of pucca drain from the L/O Prafullya Biswas towards L/O Namita Biswas at Champatala |
176600 |
Construction of pucca drain from the L/O Prafullya Biswas towards L/O Namita Biswas at Champatala1 |
Plinth level |
-
latitude : 23.05767987,23.0576793
Longitude : 88.6749868,88.67498581
file name : Image_31032022125004115.png
|
2022-03-31 12:50:04.229126 |
80 |
46911167 |
Construction of pucca drain from the L/O Prafullya Biswas towards L/O Namita Biswas at Champatala |
176600 |
Construction of pucca drain from the L/O Prafullya Biswas towards L/O Namita Biswas at Champatala1 |
Plinth level |
-
latitude : 23.05768128,23.05768363
Longitude : 88.6749871,88.67496161
file name : Image_31032022124958106.png
|
2022-03-31 12:49:58.25883 |
81 |
46911167 |
Construction of pucca drain from the L/O Prafullya Biswas towards L/O Namita Biswas at Champatala |
176600 |
Construction of pucca drain from the L/O Prafullya Biswas towards L/O Namita Biswas at Champatala1 |
Plinth level |
-
latitude : 23.05775929,23.05775866,23.05775767
Longitude : 88.67491767,88.67495017,88.67494576
file name : Image_21032022151549520.png
|
2022-03-21 15:15:49.641118 |
82 |
46911167 |
Construction of pucca drain from the L/O Prafullya Biswas towards L/O Namita Biswas at Champatala |
176600 |
Construction of pucca drain from the L/O Prafullya Biswas towards L/O Namita Biswas at Champatala1 |
Completion of work |
-
latitude : 23.05773354,23.05773216
Longitude : 88.67512362,88.67512319
file name : Image_21032022135502881.png
|
2022-03-21 13:55:02.994609 |
83 |
46962636 |
Construction of BT road from the S/O Bijoy Biswas towards H/O Sailen Biswas at Champatala |
129770 |
Construction of BT road from the S/O Bijoy Biswas towards H/O Sailen Biswas at Champatala1 |
Roof laid |
-
latitude : 23.055305988527834,23.05534358136356,23.055410510860384
Longitude : 88.67330440320075,88.67332024499774,88.67334782145917
file name : Image_09122023143640054.png
|
2023-12-09 14:36:40.139974 |
84 |
46962636 |
Construction of BT road from the S/O Bijoy Biswas towards H/O Sailen Biswas at Champatala |
129770 |
Construction of BT road from the S/O Bijoy Biswas towards H/O Sailen Biswas at Champatala1 |
Plinth level |
-
latitude : 23.05570275,23.05568758
Longitude : 88.67357986,88.67356899
file name : Image_31032022142138227.png
|
2022-03-31 14:21:38.328648 |
85 |
46962636 |
Construction of BT road from the S/O Bijoy Biswas towards H/O Sailen Biswas at Champatala |
129770 |
Construction of BT road from the S/O Bijoy Biswas towards H/O Sailen Biswas at Champatala1 |
Plinth level |
-
latitude : 23.0557324,23.05566949
Longitude : 88.67359238,88.67355967
file name : Image_31032022142133059.png
|
2022-03-31 14:21:33.168673 |
86 |
46962636 |
Construction of BT road from the S/O Bijoy Biswas towards H/O Sailen Biswas at Champatala |
129770 |
Construction of BT road from the S/O Bijoy Biswas towards H/O Sailen Biswas at Champatala1 |
Plinth level |
-
latitude : 23.05579246,23.05579086,23.05578354
Longitude : 88.67364835,88.673648,88.67363445
file name : Image_21032022151544090.png
|
2022-03-21 15:15:44.1897 |
87 |
46962636 |
Construction of BT road from the S/O Bijoy Biswas towards H/O Sailen Biswas at Champatala |
129770 |
Construction of BT road from the S/O Bijoy Biswas towards H/O Sailen Biswas at Champatala1 |
Completion of work |
-
latitude : 23.05580871,23.05581121
Longitude : 88.67361566,88.67360677
file name : Image_21032022135459349.png
|
2022-03-21 13:54:59.456218 |
88 |
46965573 |
Construction of CC road from the H/O Jiten Sardar towards H/O Arun Karmakar at Srinagar |
129770 |
Construction of CC road from the H/O Jiten Sardar towards H/O Arun Karmakar at Srinagar1 |
Roof laid |
-
latitude : 23.0446347,23.0454804,23.0454804
Longitude : 88.67461264,88.6747641,88.6747641
file name : Image_22032022142206360.png
|
2022-03-22 14:22:06.460021 |
89 |
46965573 |
Construction of CC road from the H/O Jiten Sardar towards H/O Arun Karmakar at Srinagar |
129770 |
Construction of CC road from the H/O Jiten Sardar towards H/O Arun Karmakar at Srinagar1 |
Roof laid |
-
latitude : 23.0446554,23.0446554,23.0446288
Longitude : 88.6746285,88.6746285,88.6746174
file name : Image_09122023141521805.png
|
2023-12-09 14:15:21.892896 |
90 |
46965573 |
Construction of CC road from the H/O Jiten Sardar towards H/O Arun Karmakar at Srinagar |
129770 |
Construction of CC road from the H/O Jiten Sardar towards H/O Arun Karmakar at Srinagar1 |
Plinth level |
-
latitude : 23.04463461,23.0456641
Longitude : 88.6746231,88.674671
file name : Image_21032022151523052.png
|
2022-03-21 15:15:23.138971 |
91 |
46965573 |
Construction of CC road from the H/O Jiten Sardar towards H/O Arun Karmakar at Srinagar |
129770 |
Construction of CC road from the H/O Jiten Sardar towards H/O Arun Karmakar at Srinagar1 |
Completion of work |
-
latitude : 23.04449832,23.04450101,23.0456647
Longitude : 88.67457463,88.67457449,88.6746739
file name : Image_21032022135449470.png
|
2022-03-21 13:54:49.570007 |
92 |
59441271 |
Construction of CC road from the shop of Dipankar biswas towards h/o R Biswas at Srirampur S |
35000 |
Construction of CC road from the shop of Dipankar biswas towards h/o R Biswas at Srirampur S1 |
Roof laid |
-
latitude : 23.0376054,23.0376054,23.0376054
Longitude : 88.6778404,88.6778403,88.6778403
file name : Image_21082024173301751.png
|
2024-08-21 17:33:01.860857 |
93 |
59441271 |
Construction of CC road from the shop of Dipankar biswas towards h/o R Biswas at Srirampur S |
35000 |
Construction of CC road from the shop of Dipankar biswas towards h/o R Biswas at Srirampur S1 |
Roof laid |
-
latitude : 23.0376057,23.0376057
Longitude : 88.6778407,88.6778407
file name : Image_21082024172508966.png
|
2024-08-21 17:25:09.063412 |
94 |
59441271 |
Construction of CC road from the shop of Dipankar biswas towards h/o R Biswas at Srirampur S |
35000 |
Construction of CC road from the shop of Dipankar biswas towards h/o R Biswas at Srirampur S1 |
Plinth level |
-
latitude : 23.038201541639864,23.03816474508494
Longitude : 88.67785418406129,88.67785703390837
file name : Image_14122023142306660.png
|
2023-12-14 14:23:06.757557 |
95 |
59441271 |
Construction of CC road from the shop of Dipankar biswas towards h/o R Biswas at Srirampur S |
35000 |
Construction of CC road from the shop of Dipankar biswas towards h/o R Biswas at Srirampur S1 |
Plinth level |
-
latitude : 23.03821453358978,23.03820087108761
Longitude : 88.6779189761728,88.6779136955738
file name : Image_14122023142213397.png
|
2023-12-14 14:22:13.493743 |
96 |
59441271 |
Construction of CC road from the shop of Dipankar biswas towards h/o R Biswas at Srirampur S |
35000 |
Construction of CC road from the shop of Dipankar biswas towards h/o R Biswas at Srirampur S1 |
Plinth level |
-
latitude : 23.038116,23.038116,23.038116
Longitude : 88.6773073,88.6773073,88.6773073
file name : Image_11122023141039176.png
|
2023-12-11 14:10:39.271749 |
97 |
59441271 |
Construction of CC road from the shop of Dipankar biswas towards h/o R Biswas at Srirampur S |
35000 |
Construction of CC road from the shop of Dipankar biswas towards h/o R Biswas at Srirampur S1 |
Completion of work |
-
latitude : 23.03813519887626,23.03811193909496,23.03807551972568
Longitude : 88.67779986932874,88.67780799977481,88.67779936641455
file name : Image_06122023143630790.png
|
2023-12-06 14:36:30.879155 |
98 |
39061762 |
Instalation of Sajaldhara Prokalpo at Pitilitala School. |
1167751 |
Instalation of Sajaldhara Prokalpo at Pitilitala School.1 |
Completion of work |
-
latitude : 23.058658791705966
Longitude : 88.68787516839802
file name : Image_13092022124707501.png
|
2022-09-13 12:47:07.611088 |
99 |
39061762 |
Instalation of Sajaldhara Prokalpo at Pitilitala School. |
1167751 |
Instalation of Sajaldhara Prokalpo at Pitilitala School.1 |
Completion of work |
-
latitude : 23.05866725742817
Longitude : 88.68788539431989
file name : Image_13092022124551295.png
|
2022-09-13 12:45:51.415659 |
100 |
39061762 |
Instalation of Sajaldhara Prokalpo at Pitilitala School. |
1167751 |
Instalation of Sajaldhara Prokalpo at Pitilitala School.1 |
Plinth level |
-
latitude : 23.058744915761054
Longitude : 88.68782554753125
file name : Image_07112022171059081.png
|
2022-11-07 17:10:59.167772 |
101 |
39061657 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office. |
1167751 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office.1 |
Plinth level |
-
latitude : 23.0375818
Longitude : 88.6777772
file name : Image_13092022143018633.png
|
2022-09-13 14:30:18.722214 |
102 |
39061657 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office. |
1167751 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office.1 |
Plinth level |
-
latitude : 23.0376646
Longitude : 88.6778484
file name : Image_13092022142928968.png
|
2022-09-13 14:29:29.058514 |
103 |
39061657 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office. |
1167751 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office.1 |
Plinth level |
-
latitude : 23.0375914
Longitude : 88.6779264
file name : Image_11122023132808720.png
|
2023-12-11 13:28:08.811079 |
104 |
39061657 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office. |
1167751 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office.1 |
Plinth level |
-
latitude : 23.0375875
Longitude : 88.6779269
file name : Image_11122023132443177.png
|
2023-12-11 13:24:43.264204 |
105 |
39061657 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office. |
1167751 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office.1 |
Plinth level |
-
latitude : 23.037594
Longitude : 88.6779225
file name : Image_09122023151242271.png
|
2023-12-09 15:12:42.380733 |
106 |
39061657 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office. |
1167751 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office.1 |
Plinth level |
-
latitude : 23.037559613585472
Longitude : 88.67790422402322
file name : Image_07122023120352302.png
|
2023-12-07 12:03:52.392258 |
107 |
39061657 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office. |
1167751 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office.1 |
Plinth level |
-
latitude : 23.03755932021886
Longitude : 88.67778679355979
file name : Image_06122023175415868.png
|
2023-12-06 17:54:16.06155 |
108 |
39061657 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office. |
1167751 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office.1 |
Plinth level |
-
latitude : 23.0375943
Longitude : 88.6779074
file name : Image_05122023113254568.png
|
2023-12-05 11:32:54.673435 |
109 |
39061657 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office. |
1167751 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office.1 |
Completion of work |
-
latitude : 23.0375778
Longitude : 88.6777807
file name : Image_13092022131006378.png
|
2022-09-13 13:10:06.471331 |
110 |
39061657 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office. |
1167751 |
Instalation of Sajaldhara Prokalpo at Silinda-II Gram Panchayat office.1 |
Completion of work |
-
latitude : 23.037520134821534
Longitude : 88.6779224127531
file name : Image_13092022130931708.png
|
2022-09-13 13:09:31.796087 |
111 |
64898008 |
Renovation & maintenance work of Silinda-II G.P office building at Srirampur south. |
238850 |
Renovation & maintenance work of Silinda-II G.P office building at Srirampur south.1 |
Plinth level |
-
latitude : 23.0376162
Longitude : 88.677799
file name : Image_26042023143221557.png
|
2023-04-26 14:32:21.650994 |
112 |
64898008 |
Renovation & maintenance work of Silinda-II G.P office building at Srirampur south. |
238850 |
Renovation & maintenance work of Silinda-II G.P office building at Srirampur south.1 |
Plinth level |
-
latitude : 23.0375943
Longitude : 88.6779074
file name : Image_06122023120518907.png
|
2023-12-06 12:05:18.998555 |
113 |
64898008 |
Renovation & maintenance work of Silinda-II G.P office building at Srirampur south. |
238850 |
Renovation & maintenance work of Silinda-II G.P office building at Srirampur south.1 |
Completion of work |
-
latitude : 23.037605085410178
Longitude : 88.67787723429501
file name : Image_26042023140754561.png
|
2023-04-26 14:07:54.659943 |
114 |
64897724 |
Construction of CC road from the h/o Gora das to Play Ground at Srinagar |
170000 |
Construction of CC road from the h/o Gora das to Play Ground at Srinagar1 |
Plinth level |
-
latitude : 23.046972071751952,23.046925216913223,23.0468210298568
Longitude : 88.67872984148562,88.67874551564455,88.6787633690983
file name : Image_09122023144918392.png
|
2023-12-09 14:49:18.4851 |
115 |
64897724 |
Construction of CC road from the h/o Gora das to Play Ground at Srinagar |
170000 |
Construction of CC road from the h/o Gora das to Play Ground at Srinagar1 |
Completion of work |
-
latitude : 23.0469431,23.0469429
Longitude : 88.6788104,88.6788103
file name : Image_14042023172045243.png
|
2023-04-14 17:20:45.327389 |
116 |
64897724 |
Construction of CC road from the h/o Gora das to Play Ground at Srinagar |
170000 |
Construction of CC road from the h/o Gora das to Play Ground at Srinagar1 |
Completion of work |
-
latitude : 23.0469425,23.046968174166977
Longitude : 88.6788102,88.67873646318913
file name : Image_06022023151200872.png
|
2023-02-06 15:12:00.96097 |
117 |
64897608 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.0376163
Longitude : 88.6778042
file name : Image_26042023143108669.png
|
2023-04-26 14:31:08.773823 |
118 |
64897608 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.0376171
Longitude : 88.677804
file name : Image_26042023140528059.png
|
2023-04-26 14:05:28.169542 |
119 |
64897608 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.0375946
Longitude : 88.677907
file name : Image_06122023120524991.png
|
2023-12-06 12:05:25.066792 |
120 |
46966626 |
Construction of CC road from the H/O Apu Samajdar towards H/O Suvo Samajdar at Ghoramara. |
129770 |
Construction of CC road from the H/O Apu Samajdar towards H/O Suvo Samajdar at Ghoramara. 1 |
Plinth level |
-
latitude : 23.02723021712154,23.0272626131773,23.02728465758264
Longitude : 88.66661463864148,88.66665705107152,88.66665948182344
file name : Image_09122023134519310.png
|
2023-12-09 13:45:19.401627 |
121 |
46966626 |
Construction of CC road from the H/O Apu Samajdar towards H/O Suvo Samajdar at Ghoramara. |
129770 |
Construction of CC road from the H/O Apu Samajdar towards H/O Suvo Samajdar at Ghoramara. 1 |
Completion of work |
-
latitude : 23.027229253202677,23.027239479124546
Longitude : 88.66683684289455,88.66681178100407
file name : Image_06022023152146595.png
|
2023-02-06 15:21:46.693801 |
122 |
46966626 |
Construction of CC road from the H/O Apu Samajdar towards H/O Suvo Samajdar at Ghoramara. |
129770 |
Construction of CC road from the H/O Apu Samajdar towards H/O Suvo Samajdar at Ghoramara. 1 |
Completion of work |
-
latitude : 23.027222002856433,23.02724400535226
Longitude : 88.66682762280107,88.66679057478905
file name : Image_06022023151206739.png
|
2023-02-06 15:12:06.841823 |
123 |
46966626 |
Construction of CC road from the H/O Apu Samajdar towards H/O Suvo Samajdar at Ghoramara. |
129770 |
Construction of CC road from the H/O Apu Samajdar towards H/O Suvo Samajdar at Ghoramara. 1 |
Completion of work |
-
latitude : 23.027237341739237,23.02726332563907
Longitude : 88.66671689786017,88.6666995473206
file name : Image_06022023151143024.png
|
2023-02-06 15:11:43.119485 |
124 |
46966951 |
Construction of CC road from Samajdar Para pacca rasta towards H/O Bijoylaxhmi Haldar at Ghoramara |
129770 |
Construction of CC road from Samajdar Para pacca rasta towards H/O Bijoylaxhmi Haldar at Ghoramara1 |
Plinth level |
-
latitude : 23.028911878354847,23.02897084504366,23.029024405404925
Longitude : 88.6670938320458,88.66709760390222,88.6671052314341
file name : Image_09122023135031141.png
|
2023-12-09 13:50:31.235545 |
125 |
46966951 |
Construction of CC road from Samajdar Para pacca rasta towards H/O Bijoylaxhmi Haldar at Ghoramara |
129770 |
Construction of CC road from Samajdar Para pacca rasta towards H/O Bijoylaxhmi Haldar at Ghoramara1 |
Completion of work |
-
latitude : 23.028876925818622,23.028924828395247
Longitude : 88.66712911985815,88.66713523864746
file name : Image_06022023152150582.png
|
2023-02-06 15:21:50.695055 |
126 |
46966951 |
Construction of CC road from Samajdar Para pacca rasta towards H/O Bijoylaxhmi Haldar at Ghoramara |
129770 |
Construction of CC road from Samajdar Para pacca rasta towards H/O Bijoylaxhmi Haldar at Ghoramara1 |
Completion of work |
-
latitude : 23.02890638820827,23.028940712101758
Longitude : 88.6670814268291,88.66710154339671
file name : Image_06022023151149521.png
|
2023-02-06 15:11:49.625247 |
127 |
46967174 |
Construction of CC road from the H/O Ananda Sardar towards H/O Sukanta Sardar at Ghoramara |
129770 |
Construction of CC road from the H/O Ananda Sardar towards H/O Sukanta Sardar at Ghoramara 1 |
Plinth level |
-
latitude : 23.033769107423723,23.033697861246765,23.03361089900136
Longitude : 88.66716382093728,88.66715292446315,88.66713599301875
file name : Image_09122023135654394.png
|
2023-12-09 13:56:54.479161 |
128 |
46967174 |
Construction of CC road from the H/O Ananda Sardar towards H/O Sukanta Sardar at Ghoramara |
129770 |
Construction of CC road from the H/O Ananda Sardar towards H/O Sukanta Sardar at Ghoramara 1 |
Completion of work |
-
latitude : 23.03340573,23.03337695
Longitude : 88.6672888,88.66729936
file name : Image_31032022142144736.png
|
2022-03-31 14:21:44.832788 |
129 |
46967174 |
Construction of CC road from the H/O Ananda Sardar towards H/O Sukanta Sardar at Ghoramara |
129770 |
Construction of CC road from the H/O Ananda Sardar towards H/O Sukanta Sardar at Ghoramara 1 |
Completion of work |
-
latitude : 23.03343183,23.03338594
Longitude : 88.66728042,88.66727862
file name : Image_31032022142141456.png
|
2022-03-31 14:21:41.558956 |
130 |
46909742 |
Construction of pucca drain from H/O Purnima Mundari towards H/O Chaityana Hira at Srinagar |
176600 |
Construction of pucca drain from H/O Purnima Mundari towards H/O Chaityana Hira at Srinagar 1 |
Plinth level |
-
latitude : 23.053298103623092,23.053230796940625,23.05318804923445
Longitude : 88.67196656763554,88.6719286814332,88.67187478579581
file name : Image_09122023144914860.png
|
2023-12-09 14:49:14.956548 |
131 |
46909742 |
Construction of pucca drain from H/O Purnima Mundari towards H/O Chaityana Hira at Srinagar |
176600 |
Construction of pucca drain from H/O Purnima Mundari towards H/O Chaityana Hira at Srinagar 1 |
Completion of work |
-
latitude : 23.05350194,23.05350261
Longitude : 88.67208898,88.67208796
file name : Image_21032022135506679.png
|
2022-03-21 13:55:06.790539 |
132 |
71314935 |
Construction of roads |
235528 |
Construction of roads1 |
Completion of work |
-
latitude : 23.038651230745018,23.03868308197707
Longitude : 88.66770755499601,88.667744519189
file name : Image_03072024140310469.png
|
2024-07-03 14:03:10.57634 |
133 |
71314935 |
Construction of roads |
235528 |
Construction of roads1 |
Roof laid |
-
latitude : 23.038700935430825,23.03871019743383
Longitude : 88.66775197908282,88.66775541566312
file name : Image_03072024142325471.png
|
2024-07-03 14:23:25.557207 |
134 |
71314935 |
Construction of roads |
235528 |
Construction of roads1 |
Plinth level |
-
latitude : 23.0386918829754,23.038719375617802
Longitude : 88.66778651252389,88.66778366267681
file name : Image_03072024141949384.png
|
2024-07-03 14:19:49.487323 |
135 |
71314935 |
Construction of roads |
235528 |
Construction of roads1 |
Completion of work |
-
latitude : 23.038653410039842,23.038678932935
Longitude : 88.66773127578199,88.6677307728678
file name : Image_03072024140129043.png
|
2024-07-03 14:01:29.139054 |
136 |
71314935 |
Construction of roads |
235528 |
Construction of roads1 |
Completion of work |
-
latitude : 23.038666821084917,23.038677633740008
Longitude : 88.6677706707269,88.6677720118314
file name : Image_03072024135812740.png
|
2024-07-03 13:58:12.840402 |
137 |
71314935 |
Construction of roads |
235528 |
Construction of roads1 |
Completion of work |
-
latitude : 23.0382815,23.0382815
Longitude : 88.6683264,88.6683264
file name : Image_01072024152515473.png
|
2024-07-01 15:25:15.574528 |
138 |
71314935 |
Construction of roads |
235528 |
Construction of roads1 |
Completion of work |
-
latitude : 23.03867327515036,23.038688907399774
Longitude : 88.66771778091788,88.66771618835628
file name : Image_01072024145443674.png
|
2024-07-01 14:54:43.76263 |
139 |
71314935 |
Construction of roads |
235528 |
Construction of roads1 |
Completion of work |
-
latitude : 23.0382815,23.0382815
Longitude : 88.6683264,88.6683264
file name : Image_01072024145300386.png
|
2024-07-01 14:53:00.463926 |
140 |
71314935 |
Construction of roads |
235528 |
Construction of roads1 |
Completion of work |
-
latitude : 23.038659570738673,23.038711035624146
Longitude : 88.66777905263007,88.6677706707269
file name : Image_26062024131036503.png
|
2024-06-26 13:10:36.602426 |
141 |
71314935 |
Construction of roads |
235528 |
Construction of roads1 |
Completion of work |
-
latitude : 23.03866719827056,23.038686770014465
Longitude : 88.66770931519568,88.66772029548883
file name : Image_26062024130916202.png
|
2024-06-26 13:09:16.297101 |
142 |
71321198 |
Construction of roads |
249500 |
Construction of roads1 |
Roof laid |
-
latitude : 23.038085703738034,23.03806814365089
Longitude : 88.68050663731992,88.68051594123244
file name : Image_03072024150212491.png
|
2024-07-03 15:02:12.593237 |
143 |
71321198 |
Construction of roads |
249500 |
Construction of roads1 |
Plinth level |
-
latitude : 23.03810133598745,23.038086164742708
Longitude : 88.68053144775331,88.68052222765982
file name : Image_03072024145928707.png
|
2024-07-03 14:59:28.807472 |
144 |
71321198 |
Construction of roads |
249500 |
Construction of roads1 |
Completion of work |
-
latitude : 23.038148316554725,23.038131427019835
Longitude : 88.68054175749421,88.68053547106683
file name : Image_01072024153242161.png
|
2024-07-01 15:32:42.264316 |
145 |
71321198 |
Construction of roads |
249500 |
Construction of roads1 |
Completion of work |
-
latitude : 23.0381419043988,23.03810829296708
Longitude : 88.68053002282977,88.68053798563778
file name : Image_01072024153157736.png
|
2024-07-01 15:31:57.84692 |
146 |
71321198 |
Construction of roads |
249500 |
Construction of roads1 |
Completion of work |
-
latitude : 23.038131846114993,23.038116130046546
Longitude : 88.68055701255798,88.68053647689521
file name : Image_01072024153048753.png
|
2024-07-01 15:30:48.865825 |
147 |
71321198 |
Construction of roads |
249500 |
Construction of roads1 |
Completion of work |
-
latitude : 23.038102174177766,23.038064329884946
Longitude : 88.6804891191423,88.68050437420607
file name : Image_26062024131832077.png
|
2024-06-26 13:18:32.162092 |
148 |
71317184 |
Construction of roads |
139720 |
Construction of roads1 |
Roof laid |
-
latitude : 23.03902057930827,23.03906793706119
Longitude : 88.67531798779964,88.67533047683537
file name : Image_03072024145102040.png
|
2024-07-03 14:51:02.128689 |
149 |
71317184 |
Construction of roads |
139720 |
Construction of roads1 |
Roof laid |
-
latitude : 23.039106116630137,23.039111271500587
Longitude : 88.67536475881934,88.67536509409547
file name : Image_03072024144747124.png
|
2024-07-03 14:47:47.208837 |
150 |
71317184 |
Construction of roads |
139720 |
Construction of roads1 |
Plinth level |
-
latitude : 23.0391165940091,23.039129502139986
Longitude : 88.67534707300365,88.67535947822034
file name : Image_03072024144535529.png
|
2024-07-03 14:45:35.615797 |
151 |
71317184 |
Construction of roads |
139720 |
Construction of roads1 |
Completion of work |
-
latitude : 23.039081473834813,23.039095387794077
Longitude : 88.67538378573954,88.67538244463503
file name : Image_01072024152706665.png
|
2024-07-01 15:27:06.76342 |
152 |
71317184 |
Construction of roads |
139720 |
Construction of roads1 |
Completion of work |
-
latitude : 23.039116552099586,23.039138135500252
Longitude : 88.67541102692485,88.67541253566742
file name : Image_01072024152624301.png
|
2024-07-01 15:26:24.412573 |
153 |
71317184 |
Construction of roads |
139720 |
Construction of roads1 |
Completion of work |
-
latitude : 23.039090735837817,23.039100794121623
Longitude : 88.67542644962668,88.67542636580765
file name : Image_01072024152522003.png
|
2024-07-01 15:25:22.104553 |
154 |
71317184 |
Construction of roads |
139720 |
Construction of roads1 |
Completion of work |
-
latitude : 23.039105404168367,23.039120072498918
Longitude : 88.67539334110916,88.67538873106241
file name : Image_01072024152518744.png
|
2024-07-01 15:25:18.847218 |
155 |
71317184 |
Construction of roads |
139720 |
Construction of roads1 |
Completion of work |
-
latitude : 23.039090735837817,23.039107751101255
Longitude : 88.67535939440131,88.67536735720932
file name : Image_26062024131502859.png
|
2024-06-26 13:15:02.954875 |
156 |
71317184 |
Construction of roads |
139720 |
Construction of roads1 |
Completion of work |
-
latitude : 23.03905247244984,23.03910527843982
Longitude : 88.67538898251951,88.67538956925273
file name : Image_26062024131414212.png
|
2024-06-26 13:14:14.298902 |
157 |
107633395 |
Operation and Maintenance of drinking/piped water supply system |
364294 |
Operation and Maintenance of drinking/piped water supply system1 |
Roof laid |
-
latitude : 23.037570845335722
Longitude : 88.6778188124299
file name : Image_19092024153258680.png
|
2024-09-19 15:32:58.772862 |
158 |
107633395 |
Operation and Maintenance of drinking/piped water supply system |
364294 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 23.037597709335387
Longitude : 88.67781789042056
file name : Image_19092024153051994.png
|
2024-09-19 15:30:51.75139 |
159 |
107633395 |
Operation and Maintenance of drinking/piped water supply system |
364294 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 23.037589830346406
Longitude : 88.67778830230236
file name : Image_19092024152438085.png
|
2024-09-19 15:24:38.183631 |
160 |
107633440 |
Operation and Maintenance of drinking/piped water supply system |
190000 |
Operation and Maintenance of drinking/piped water supply system1 |
Roof laid |
-
latitude : 23.058633226901293
Longitude : 88.68785270489752
file name : Image_25092024163326231.png
|
2024-09-25 16:33:26.334002 |
161 |
107633440 |
Operation and Maintenance of drinking/piped water supply system |
190000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 23.05865904316306
Longitude : 88.68790282867849
file name : Image_25092024163054042.png
|
2024-09-25 16:30:54.13667 |
162 |
107633440 |
Operation and Maintenance of drinking/piped water supply system |
190000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 23.0587701452896
Longitude : 88.6878333427012
file name : Image_25092024162542822.png
|
2024-09-25 16:25:42.91577 |
163 |
97705935 |
Construction of roads |
137487 |
Construction of roads1 |
Roof laid |
-
latitude : 23.048144867643714,23.04815035779029
Longitude : 88.67441207170486,88.6744034383446
file name : Image_19092024155251985.png
|
2024-09-19 15:52:52.084622 |
164 |
97705935 |
Construction of roads |
137487 |
Construction of roads1 |
Plinth level |
-
latitude : 23.048164062201977,23.048164062201977
Longitude : 88.6744330264628,88.6744330264628
file name : Image_19092024154742324.png
|
2024-09-19 15:47:42.417121 |
165 |
97705935 |
Construction of roads |
137487 |
Construction of roads1 |
Completion of work |
-
latitude : 23.048133091069758,23.04815107025206
Longitude : 88.67425876669586,88.67440218105912
file name : Image_19092024154104900.png
|
2024-09-19 15:41:04.984085 |
166 |
107633347 |
Creation of a new source of drinking water |
400000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.047011801972985
Longitude : 88.67804680019617
file name : Image_24092024163846998.png
|
2024-09-24 16:38:47.094899 |
167 |
107633347 |
Creation of a new source of drinking water |
400000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.04699373897165
Longitude : 88.6780537571758
file name : Image_24092024163344918.png
|
2024-09-24 16:33:45.013581 |
168 |
107633329 |
Creation of a new source of drinking water |
400000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.0478944
Longitude : 88.6684254
file name : Image_24092024165312169.png
|
2024-09-24 16:53:12.264794 |
169 |
107633329 |
Creation of a new source of drinking water |
400000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.0478933
Longitude : 88.6684231
file name : Image_24092024164633946.png
|
2024-09-24 16:46:34.054497 |
170 |
97740994 |
Drainage Construction |
170370 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.050012355670333
Longitude : 88.68255852721632
file name : Image_24092024162722713.png
|
2024-09-24 16:27:22.800326 |
171 |
97740994 |
Drainage Construction |
170370 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.0496198
Longitude : 88.683177
file name : Image_24092024162141447.png
|
2024-09-24 16:21:41.536088 |
172 |
97740994 |
Drainage Construction |
170370 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.0496181
Longitude : 88.6831733
file name : Image_24092024161322171.png
|
2024-09-24 16:13:22.2556 |
173 |
97740150 |
Drainage Construction |
170370 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.04069096688181
Longitude : 88.66606906056404
file name : Image_24092024154318011.png
|
2024-09-24 15:43:18.101051 |
174 |
97740150 |
Drainage Construction |
170370 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.0376418819651
Longitude : 88.67777883075178
file name : Image_24092024153734010.png
|
2024-09-24 15:37:34.112542 |
175 |
71339953 |
Drainage Construction |
220000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.036776073276997
Longitude : 88.66960815154016
file name : Image_12072024162548307.png
|
2024-07-12 16:25:48.286477 |
176 |
71339953 |
Drainage Construction |
220000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.03675641771406
Longitude : 88.66961242631078
file name : Image_12072024161955041.png
|
2024-07-12 16:19:55.134106 |
177 |
71339953 |
Drainage Construction |
220000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.03677523508668
Longitude : 88.6696299444884
file name : Image_12072024161216010.png
|
2024-07-12 16:12:15.497819 |
178 |
71339953 |
Drainage Construction |
220000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.036777707748115
Longitude : 88.66965458728373
file name : Image_12072024161116903.png
|
2024-07-12 16:11:17.006106 |
179 |
71339953 |
Drainage Construction |
220000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.03676056675613
Longitude : 88.66959792561829
file name : Image_12072024155520262.png
|
2024-07-12 15:55:20.364346 |
180 |
107273895 |
Electricity connection /Installation of Solar Energy |
849695 |
Electricity connection /Installation of Solar Energy1 |
Roof laid |
-
latitude : 23.03762348368764
Longitude : 88.67779106833041
file name : Image_27092024153344995.png
|
2024-09-27 15:33:45.123736 |
181 |
107273895 |
Electricity connection /Installation of Solar Energy |
849695 |
Electricity connection /Installation of Solar Energy1 |
Plinth level |
-
latitude : 23.0383507
Longitude : 88.677508
file name : Image_27092024153112541.png
|
2024-09-27 15:31:12.627229 |
182 |
107273895 |
Electricity connection /Installation of Solar Energy |
849695 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 23.037617448717356
Longitude : 88.67774999700487
file name : Image_27092024151915119.png
|
2024-09-27 15:19:15.275825 |
183 |
107274190 |
Electricity in GP Bhawan |
300000 |
Electricity in GP Bhawan1 |
Roof laid |
-
latitude : 23.037924435921013
Longitude : 88.67783817462623
file name : Image_16082024161846604.png
|
2024-08-16 16:18:46.676615 |
184 |
107274190 |
Electricity in GP Bhawan |
300000 |
Electricity in GP Bhawan1 |
Roof laid |
-
latitude : 23.0376063
Longitude : 88.6778316
file name : Image_06082024161036915.png
|
2024-08-06 16:10:37.051485 |
185 |
107274190 |
Electricity in GP Bhawan |
300000 |
Electricity in GP Bhawan1 |
Plinth level |
-
latitude : 23.0376054
Longitude : 88.6778313
file name : Image_06082024160759962.png
|
2024-08-06 16:08:00.051016 |
186 |
107274190 |
Electricity in GP Bhawan |
300000 |
Electricity in GP Bhawan1 |
Completion of work |
-
latitude : 23.03756883367896
Longitude : 88.67796516045928
file name : Image_06082024155116644.png
|
2024-08-06 15:51:16.788207 |
187 |
107274190 |
Electricity in GP Bhawan |
300000 |
Electricity in GP Bhawan1 |
Completion of work |
-
latitude : 23.037503832019866
Longitude : 88.67776290513575
file name : Image_06082024154856517.png
|
2024-08-06 15:48:56.613575 |
188 |
107274190 |
Electricity in GP Bhawan |
300000 |
Electricity in GP Bhawan1 |
Completion of work |
-
latitude : 23.0375417182222
Longitude : 88.67825148627162
file name : Image_06082024154739702.png
|
2024-08-06 15:47:39.803406 |
189 |
107274316 |
Construction of new Piped Water Supply schemes |
1124972 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 23.038688488304615
Longitude : 88.6769471783191
file name : Image_06082024165218279.png
|
2024-08-06 16:52:18.393744 |
190 |
107274316 |
Construction of new Piped Water Supply schemes |
1124972 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 23.038747371174395
Longitude : 88.67696503177285
file name : Image_06082024165149983.png
|
2024-08-06 16:51:50.076258 |
191 |
107274316 |
Construction of new Piped Water Supply schemes |
1124972 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 23.03859838284552
Longitude : 88.67704273201525
file name : Image_06082024164347103.png
|
2024-08-06 16:43:47.20213 |
192 |
107274316 |
Construction of new Piped Water Supply schemes |
1124972 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 23.03859838284552
Longitude : 88.67704273201525
file name : Image_06082024164343568.png
|
2024-08-06 16:43:43.679408 |
193 |
107274316 |
Construction of new Piped Water Supply schemes |
1124972 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 23.038663677871227
Longitude : 88.67697408422828
file name : Image_06082024164339680.png
|
2024-08-06 16:43:39.878378 |
194 |
106984883 |
Construction of Sheds |
466332 |
Construction of Sheds1 |
Roof laid |
-
latitude : 23.037607
Longitude : 88.677841
file name : Image_04092024130851316.png
|
2024-09-04 13:08:51.409168 |
195 |
106984883 |
Construction of Sheds |
466332 |
Construction of Sheds1 |
Plinth level |
-
latitude : 23.037603
Longitude : 88.6778333
file name : Image_04092024125632708.png
|
2024-09-04 12:56:32.798049 |
196 |
106984883 |
Construction of Sheds |
466332 |
Construction of Sheds1 |
Plinth level |
-
latitude : 23.0380053
Longitude : 88.6773731
file name : Image_07082024115022232.png
|
2024-08-07 11:50:22.320169 |
197 |
106984883 |
Construction of Sheds |
466332 |
Construction of Sheds1 |
Plinth level |
-
latitude : 23.0380053
Longitude : 88.6773731
file name : Image_07082024115118758.png
|
2024-08-07 11:51:18.845304 |
198 |
106984883 |
Construction of Sheds |
466332 |
Construction of Sheds1 |
Completion of work |
-
latitude : 23.037545448169112
Longitude : 88.67768512107432
file name : Image_07082024114358573.png
|
2024-08-07 11:43:58.64688 |
199 |
59444765 |
Gram Panchayat office renovation Purpose |
257000 |
Gram Panchayat office renovation Purpose 1 |
Roof laid |
-
latitude : 23.0376063
Longitude : 88.6778316
file name : Image_07082024161221122.png
|
2024-08-07 16:12:21.234267 |
200 |
59444765 |
Gram Panchayat office renovation Purpose |
257000 |
Gram Panchayat office renovation Purpose 1 |
Completion of work |
-
latitude : 23.0376055
Longitude : 88.6778315
file name : Image_07082024160228686.png
|
2024-08-07 16:02:28.768165 |
201 |
59444765 |
Gram Panchayat office renovation Purpose |
257000 |
Gram Panchayat office renovation Purpose 1 |
Plinth level |
-
latitude : 23.0376054
Longitude : 88.677831
file name : Image_07082024160620073.png
|
2024-08-07 16:06:20.168265 |
202 |
59444765 |
Gram Panchayat office renovation Purpose |
257000 |
Gram Panchayat office renovation Purpose 1 |
Completion of work |
-
latitude : 23.0376055
Longitude : 88.677831
file name : Image_07082024155925571.png
|
2024-08-07 15:59:25.675097 |
203 |
97740519 |
Drainage Construction |
172209 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.043242
Longitude : 88.6815525
file name : Image_11092024172714774.png
|
2024-09-11 17:27:14.868297 |
204 |
97740519 |
Drainage Construction |
172209 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.04322682786733
Longitude : 88.68194346316159
file name : Image_14082024134538404.png
|
2024-08-14 13:45:37.151226 |
205 |
97740519 |
Drainage Construction |
172209 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.04322045762092
Longitude : 88.6819805111736
file name : Image_14082024134138984.png
|
2024-08-14 13:41:39.087879 |
206 |
97715199 |
Construction of roads |
214476 |
Construction of roads1 |
Roof laid |
-
latitude : 23.03500447422266,23.03500376176089
Longitude : 88.66824072785676,88.6682244669646
file name : Image_10082024175602625.png
|
2024-08-10 17:56:02.713048 |
207 |
97715199 |
Construction of roads |
214476 |
Construction of roads1 |
Plinth level |
-
latitude : 23.03503410425037,23.035036996006966
Longitude : 88.66822714917362,88.66822320967913
file name : Image_10082024175000930.png
|
2024-08-10 17:50:01.017722 |
208 |
97715199 |
Construction of roads |
214476 |
Construction of roads1 |
Completion of work |
-
latitude : 23.035028488375247,23.035028488375247
Longitude : 88.66815984249115,88.66815984249115
file name : Image_10082024174014743.png
|
2024-08-10 17:40:14.835957 |
209 |
97743038 |
Drainage Construction |
161099 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.04294536355883
Longitude : 88.67160706780851
file name : Image_02092024172608643.png
|
2024-09-02 17:26:09.061427 |
210 |
97743038 |
Drainage Construction |
161099 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.04296367801726
Longitude : 88.67154671810567
file name : Image_12082024150132652.png
|
2024-08-12 15:01:32.739912 |
211 |
97743038 |
Drainage Construction |
161099 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.042946201749146
Longitude : 88.67160975001752
file name : Image_12082024144619606.png
|
2024-08-12 14:46:19.699805 |
212 |
97742547 |
Drainage Construction |
163900 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.039953149855137
Longitude : 88.6752718873322
file name : Image_02092024174316731.png
|
2024-09-02 17:43:17.379154 |
213 |
97742547 |
Drainage Construction |
163900 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.0399110307917
Longitude : 88.67516770027578
file name : Image_02092024173820104.png
|
2024-09-02 17:38:20.684059 |
214 |
97742547 |
Drainage Construction |
163900 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.039887812919915
Longitude : 88.67514532059431
file name : Image_02092024173313088.png
|
2024-09-02 17:33:13.601797 |
215 |
97742547 |
Drainage Construction |
163900 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.039913880638778
Longitude : 88.67513819597661
file name : Image_12082024143757432.png
|
2024-08-12 14:37:57.520591 |
216 |
97742547 |
Drainage Construction |
163900 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.03991232998669
Longitude : 88.6751511041075
file name : Image_12082024142847934.png
|
2024-08-12 14:28:48.041223 |
217 |
97742547 |
Drainage Construction |
163900 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.039907510392368
Longitude : 88.67515571415424
file name : Image_12082024142400399.png
|
2024-08-12 14:24:00.495801 |
218 |
71338890 |
Drainage Construction |
199747 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.042054534889758
Longitude : 88.68217832408845
file name : Image_04092024133814645.png
|
2024-09-04 13:38:14.761197 |
219 |
71338890 |
Drainage Construction |
199747 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.041651365347207
Longitude : 88.68248728103936
file name : Image_14082024140011589.png
|
2024-08-14 14:00:11.698214 |
220 |
71338890 |
Drainage Construction |
199747 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.041665530763566
Longitude : 88.68240077979863
file name : Image_14082024135640500.png
|
2024-08-14 13:56:40.607929 |
221 |
97739465 |
Drainage Construction |
169453 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.061430645175278
Longitude : 88.68714870885015
file name : Image_02092024164040456.png
|
2024-09-02 16:40:40.581609 |
222 |
97739465 |
Drainage Construction |
169453 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.06136061437428
Longitude : 88.68718164972961
file name : Image_10082024182153731.png
|
2024-08-10 18:21:53.812385 |
223 |
97739465 |
Drainage Construction |
169453 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.061342760920525
Longitude : 88.68714401498437
file name : Image_10082024181825845.png
|
2024-08-10 18:18:25.924424 |
224 |
97742142 |
Drainage Construction |
166698 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.04205855820328
Longitude : 88.68223490193486
file name : Image_02092024165932532.png
|
2024-09-02 16:59:33.411258 |
225 |
97742142 |
Drainage Construction |
166698 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.042038357816637
Longitude : 88.6822553537786
file name : Image_14082024135311156.png
|
2024-08-14 13:53:11.294536 |
226 |
97742142 |
Drainage Construction |
166698 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.04205399006605
Longitude : 88.68224730715156
file name : Image_14082024135005737.png
|
2024-08-14 13:50:05.040343 |
227 |
97709757 |
Construction of roads |
134950 |
Construction of roads1 |
Roof laid |
-
latitude : 23.0438772,23.04369575344026
Longitude : 88.6731108,88.67318110540509
file name : Image_21082024180006755.png
|
2024-08-21 18:00:06.851823 |
228 |
97709757 |
Construction of roads |
134950 |
Construction of roads1 |
Plinth level |
-
latitude : 23.043673331849277,23.043673331849277
Longitude : 88.67321195080876,88.67321195080876
file name : Image_10082024184344988.png
|
2024-08-10 18:43:45.090681 |
229 |
97709757 |
Construction of roads |
134950 |
Construction of roads1 |
Completion of work |
-
latitude : 23.04364202544093,23.04364202544093
Longitude : 88.67326626554132,88.67326626554132
file name : Image_10082024184129651.png
|
2024-08-10 18:41:29.775136 |
230 |
106984428 |
Creation of drainage channel for management of grey water |
204999 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.05114412214607
Longitude : 88.66610711440444
file name : Image_04092024145631066.png
|
2024-09-04 14:56:31.16763 |
231 |
106984428 |
Creation of drainage channel for management of grey water |
204999 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.05112953763455
Longitude : 88.66612521931529
file name : Image_04092024145244838.png
|
2024-09-04 14:52:53.660901 |
232 |
106984428 |
Creation of drainage channel for management of grey water |
204999 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.051090436056256
Longitude : 88.6661178432405
file name : Image_12082024152558567.png
|
2024-08-12 15:25:58.678391 |
233 |
106984428 |
Creation of drainage channel for management of grey water |
204999 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.051084987819195
Longitude : 88.66604634560645
file name : Image_12082024151506272.png
|
2024-08-12 15:15:06.377963 |
234 |
106984708 |
Creation of drainage channel for management of grey water |
205255 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.034701510332525
Longitude : 88.67339878343046
file name : Image_12082024170542141.png
|
2024-08-12 17:05:42.122981 |
235 |
106984708 |
Creation of drainage channel for management of grey water |
205255 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.03469731938094
Longitude : 88.6733568739146
file name : Image_12082024165845843.png
|
2024-08-12 16:58:45.948828 |
236 |
106984596 |
Creation of drainage channel for management of grey water |
185973 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.034819862805307
Longitude : 88.66701571270823
file name : Image_12092024125117588.png
|
2024-09-12 12:51:17.68339 |
237 |
106984596 |
Creation of drainage channel for management of grey water |
185973 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.03482824470848
Longitude : 88.66703976877034
file name : Image_12092024124633305.png
|
2024-09-12 12:46:33.408361 |
238 |
71331661 |
Drainage Construction |
202499 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.060746723785996
Longitude : 88.68716245517135
file name : Image_11092024174346287.png
|
2024-09-11 17:43:46.364224 |
239 |
71331661 |
Drainage Construction |
202499 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.061089208349586
Longitude : 88.6872252356261
file name : Image_14082024132806404.png
|
2024-08-14 13:28:06.507811 |
240 |
71331661 |
Drainage Construction |
202499 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.06083775125444
Longitude : 88.68724870495498
file name : Image_13082024153323696.png
|
2024-08-13 15:33:23.859834 |
241 |
59448563 |
Construction of coverd pacca drain from the H/O Dulal Sardar towards the H/O R Roy at Khadaghata |
170000 |
Construction of coverd pacca drain from the H/O Dulal Sardar towards the H/O R Roy at Khadaghata 1 |
Roof laid |
-
latitude : 23.0376054,23.0376054
Longitude : 88.6778403,88.6778403
file name : Image_21082024171408048.png
|
2024-08-21 17:14:08.153202 |
242 |
59448563 |
Construction of coverd pacca drain from the H/O Dulal Sardar towards the H/O R Roy at Khadaghata |
170000 |
Construction of coverd pacca drain from the H/O Dulal Sardar towards the H/O R Roy at Khadaghata 1 |
Plinth level |
-
latitude : 23.0376055,23.0376055
Longitude : 88.6778404,88.6778404
file name : Image_21082024171103839.png
|
2024-08-21 17:11:03.935897 |
243 |
59448563 |
Construction of coverd pacca drain from the H/O Dulal Sardar towards the H/O R Roy at Khadaghata |
170000 |
Construction of coverd pacca drain from the H/O Dulal Sardar towards the H/O R Roy at Khadaghata 1 |
Completion of work |
-
latitude : 23.042012751102448,23.04196245968342
Longitude : 88.66950538940728,88.66951033473015
file name : Image_14122023140341235.png
|
2023-12-14 14:03:41.332594 |
244 |
59448563 |
Construction of coverd pacca drain from the H/O Dulal Sardar towards the H/O R Roy at Khadaghata |
170000 |
Construction of coverd pacca drain from the H/O Dulal Sardar towards the H/O R Roy at Khadaghata 1 |
Completion of work |
-
latitude : 23.041934254579246,23.041936601512134
Longitude : 88.66953380405903,88.66947554983199
file name : Image_14122023140243401.png
|
2023-12-14 14:02:43.492692 |
245 |
59258104 |
Construction of CC road from the h/o Shib Gain towards h/o Tanmay Biswas at Srinagar |
150000 |
Construction of CC road from the h/o Shib Gain towards h/o Tanmay Biswas at Srinagar1 |
Roof laid |
-
latitude : 23.03764603100717,23.03764603100717
Longitude : 88.67775770835578,88.67775770835578
file name : Image_21082024182845623.png
|
2024-08-21 18:28:45.732142 |
246 |
59258104 |
Construction of CC road from the h/o Shib Gain towards h/o Tanmay Biswas at Srinagar |
150000 |
Construction of CC road from the h/o Shib Gain towards h/o Tanmay Biswas at Srinagar1 |
Plinth level |
-
latitude : 23.037592973560095,23.03759037517011
Longitude : 88.67784974165261,88.67785242386162
file name : Image_21082024182702720.png
|
2024-08-21 18:27:02.826218 |
247 |
59258104 |
Construction of CC road from the h/o Shib Gain towards h/o Tanmay Biswas at Srinagar |
150000 |
Construction of CC road from the h/o Shib Gain towards h/o Tanmay Biswas at Srinagar1 |
Completion of work |
-
latitude : 23.0531638,23.0531638
Longitude : 88.6730423,88.6730423
file name : Image_05072023134409591.png
|
2023-07-05 13:44:09.704194 |
248 |
59260762 |
Construction of CC road from the h/o Laxman Samajdar towards h/o Gobinda Samajdar at Samajdarpara |
110000 |
Construction of CC road from the h/o Laxman Samajdar towards h/o Gobinda Samajdar at Samajdarpara1 |
Roof laid |
-
latitude : 23.037750888615847,23.037750888615847
Longitude : 88.67769568227232,88.67769568227232
file name : Image_21082024183800932.png
|
2024-08-21 18:38:01.020643 |
249 |
59260762 |
Construction of CC road from the h/o Laxman Samajdar towards h/o Gobinda Samajdar at Samajdarpara |
110000 |
Construction of CC road from the h/o Laxman Samajdar towards h/o Gobinda Samajdar at Samajdarpara1 |
Plinth level |
-
latitude : 23.028155746869743,23.028149544261396
Longitude : 88.66697531193495,88.66692854091525
file name : Image_06062023124845474.png
|
2023-06-06 12:48:45.577008 |
250 |
59260762 |
Construction of CC road from the h/o Laxman Samajdar towards h/o Gobinda Samajdar at Samajdarpara |
110000 |
Construction of CC road from the h/o Laxman Samajdar towards h/o Gobinda Samajdar at Samajdarpara1 |
Completion of work |
-
latitude : 23.028136300854385,23.028127290308475
Longitude : 88.6670050676912,88.66699056699872
file name : Image_26052023142947221.png
|
2023-05-26 14:29:47.335237 |
251 |
59449279 |
Construction of coverd pacca drain from the H/O Pankaj Ghosh towards the H/O of P Biswas at Srinagar |
170000 |
Construction of coverd pacca drain from the H/O Pankaj Ghosh towards the H/O of P Biswas at Srinagar1 |
Roof laid |
-
latitude : 23.03761891555041,23.03761891555041
Longitude : 88.67772376164794,88.67772376164794
file name : Image_21082024184312965.png
|
2024-08-21 18:43:13.059497 |
252 |
59449279 |
Construction of coverd pacca drain from the H/O Pankaj Ghosh towards the H/O of P Biswas at Srinagar |
170000 |
Construction of coverd pacca drain from the H/O Pankaj Ghosh towards the H/O of P Biswas at Srinagar1 |
Plinth level |
-
latitude : 23.0424248,23.0424245
Longitude : 88.6824054,88.6824053
file name : Image_26052023131857876.png
|
2023-05-26 13:18:57.996827 |
253 |
59449279 |
Construction of coverd pacca drain from the H/O Pankaj Ghosh towards the H/O of P Biswas at Srinagar |
170000 |
Construction of coverd pacca drain from the H/O Pankaj Ghosh towards the H/O of P Biswas at Srinagar1 |
Completion of work |
-
latitude : 23.0424827,23.0424827
Longitude : 88.6824239,88.6824239
file name : Image_23052023131240943.png
|
2023-05-23 13:12:41.045536 |
254 |
59447854 |
Construction of coverd pacca drain from the H/O Jugal biswas towards math at Chapatala |
170000 |
Construction of coverd pacca drain from the H/O Jugal biswas towards math at Chapatala1 |
Roof laid |
-
latitude : 23.037575078196824,23.03758199326694
Longitude : 88.6778465565294,88.67784236557782
file name : Image_21082024184859847.png
|
2024-08-21 18:48:59.935895 |
255 |
59447854 |
Construction of coverd pacca drain from the H/O Jugal biswas towards math at Chapatala |
170000 |
Construction of coverd pacca drain from the H/O Jugal biswas towards math at Chapatala1 |
Plinth level |
-
latitude : 23.05814954917878,23.058868339285254
Longitude : 88.66949809715152,88.67210092954338
file name : Image_16062023134309254.png
|
2023-06-16 13:43:09.348049 |
256 |
59447854 |
Construction of coverd pacca drain from the H/O Jugal biswas towards math at Chapatala |
170000 |
Construction of coverd pacca drain from the H/O Jugal biswas towards math at Chapatala1 |
Completion of work |
-
latitude : 23.05878380779177,23.058771486394107
Longitude : 88.6721583455801,88.6721652187407
file name : Image_26052023134610519.png
|
2023-05-26 13:46:10.60596 |
257 |
59450941 |
Construction of coverd pucca drain from H/O Sachin Sarkar towards H/O P Shaw at Srirampur S |
170000 |
Construction of coverd pucca drain from H/O Sachin Sarkar towards H/O P Shaw at Srirampur S 1 |
Roof laid |
-
latitude : 23.037520009092987,23.037526924163103
Longitude : 88.67779509164393,88.6777947563678
file name : Image_21082024185525339.png
|
2024-08-21 18:55:25.436471 |
258 |
59450941 |
Construction of coverd pucca drain from H/O Sachin Sarkar towards H/O P Shaw at Srirampur S |
170000 |
Construction of coverd pucca drain from H/O Sachin Sarkar towards H/O P Shaw at Srirampur S 1 |
Plinth level |
-
latitude : 23.03769389167428,23.03769389167428
Longitude : 88.67785133421421,88.67785133421421
file name : Image_21082024185308817.png
|
2024-08-21 18:53:08.919359 |
259 |
59450941 |
Construction of coverd pucca drain from H/O Sachin Sarkar towards H/O P Shaw at Srirampur S |
170000 |
Construction of coverd pucca drain from H/O Sachin Sarkar towards H/O P Shaw at Srirampur S 1 |
Completion of work |
-
latitude : 23.035006569698453,23.03499123081565,23.034979621879756
Longitude : 88.67327012121677,88.67326576262712,88.6732603982091
file name : Image_18082023122430849.png
|
2023-08-18 12:24:30.956887 |
260 |
59257037 |
construction of BT road from the h/o purnima biswas towards the h/o subal biswas at Champatala |
150000 |
construction of BT road from the h/o purnima biswas towards the h/o subal biswas at Champatala1 |
Roof laid |
-
latitude : 23.037780225276947,23.037778213620186
Longitude : 88.67777287960052,88.67777581326663
file name : Image_21082024190446292.png
|
2024-08-21 19:04:46.384657 |
261 |
59257037 |
construction of BT road from the h/o purnima biswas towards the h/o subal biswas at Champatala |
150000 |
construction of BT road from the h/o purnima biswas towards the h/o subal biswas at Champatala1 |
Plinth level |
-
latitude : 23.037720252759755,23.03772343788296
Longitude : 88.67778989486396,88.67778738029301
file name : Image_21082024190309473.png
|
2024-08-21 19:03:09.575393 |
262 |
59257037 |
construction of BT road from the h/o purnima biswas towards the h/o subal biswas at Champatala |
150000 |
construction of BT road from the h/o purnima biswas towards the h/o subal biswas at Champatala1 |
Completion of work |
-
latitude : 23.05580047890544,23.055842136964202
Longitude : 88.67355703376234,88.67358184419572
file name : Image_16062023135517214.png
|
2023-06-16 13:55:17.325535 |
263 |
59447069 |
Construction of covered pucca drain from H/O Ram Sarkar towards H/O S Biswas at chapatala |
170000 |
Construction of covered pucca drain from H/O Ram Sarkar towards H/O S Biswas at chapatala 1 |
Roof laid |
-
latitude : 23.03766111843288,23.03766111843288
Longitude : 88.67790103890002,88.67790103890002
file name : Image_21082024185916102.png
|
2024-08-21 18:59:16.192806 |
264 |
59447069 |
Construction of covered pucca drain from H/O Ram Sarkar towards H/O S Biswas at chapatala |
170000 |
Construction of covered pucca drain from H/O Ram Sarkar towards H/O S Biswas at chapatala 1 |
Plinth level |
-
latitude : 23.058189237490296,23.0580158
Longitude : 88.66949055343866,88.6698366
file name : Image_16062023135004496.png
|
2023-06-16 13:50:04.589209 |
265 |
59447069 |
Construction of covered pucca drain from H/O Ram Sarkar towards H/O S Biswas at chapatala |
170000 |
Construction of covered pucca drain from H/O Ram Sarkar towards H/O S Biswas at chapatala 1 |
Completion of work |
-
latitude : 23.05815147701651,23.05815943982452
Longitude : 88.66945903748274,88.6694901343435
file name : Image_26052023135354571.png
|
2023-05-26 13:53:54.664913 |
266 |
59257657 |
Construction of cc road from the h/o Dasu sardar towards h/o Prpvas Das at Kadaghata. |
150000 |
Construction of cc road from the h/o Dasu sardar towards h/o Prpvas Das at Kadaghata.1 |
Roof laid |
-
latitude : 23.037637355737388,23.037637355737388
Longitude : 88.6776655074209,88.6776655074209
file name : Image_21082024191029136.png
|
2024-08-21 19:10:29.208521 |
267 |
59257657 |
Construction of cc road from the h/o Dasu sardar towards h/o Prpvas Das at Kadaghata. |
150000 |
Construction of cc road from the h/o Dasu sardar towards h/o Prpvas Das at Kadaghata.1 |
Plinth level |
-
latitude : 23.03758857306093,23.03758857306093
Longitude : 88.67780322209,88.67780322209
file name : Image_21082024190810845.png
|
2024-08-21 19:08:10.93186 |
268 |
59257657 |
Construction of cc road from the h/o Dasu sardar towards h/o Prpvas Das at Kadaghata. |
150000 |
Construction of cc road from the h/o Dasu sardar towards h/o Prpvas Das at Kadaghata.1 |
Completion of work |
-
latitude : 23.041058010421693,23.04105520248413
Longitude : 88.66534654051065,88.66534142754972
file name : Image_05072023141322821.png
|
2023-07-05 14:13:22.914102 |
269 |
75620939 |
Construction of CC road from the Plot of Shambhu Biswas to the HO Nilratan Biswas at Srirampur North |
99850 |
Construction of CC road from the Plot of Shambhu Biswas to the HO Nilratan Biswas at Srirampur North1 |
Roof laid |
-
latitude : 23.037935039028525,23.03793692495674
Longitude : 88.67736929096282,88.67734422907233
file name : Image_21082024191855206.png
|
2024-08-21 19:18:55.307051 |
270 |
75620939 |
Construction of CC road from the Plot of Shambhu Biswas to the HO Nilratan Biswas at Srirampur North |
99850 |
Construction of CC road from the Plot of Shambhu Biswas to the HO Nilratan Biswas at Srirampur North1 |
Plinth level |
-
latitude : 23.0376764992252,23.0376764992252
Longitude : 88.67772124707699,88.67772124707699
file name : Image_21082024191655188.png
|
2024-08-21 19:16:55.280772 |
271 |
75620939 |
Construction of CC road from the Plot of Shambhu Biswas to the HO Nilratan Biswas at Srirampur North |
99850 |
Construction of CC road from the Plot of Shambhu Biswas to the HO Nilratan Biswas at Srirampur North1 |
Completion of work |
-
latitude : 23.039654879830778,23.039688407443464
Longitude : 88.67756417021155,88.67756316438317
file name : Image_14122023141933941.png
|
2023-12-14 14:19:34.026818 |
272 |
75620939 |
Construction of CC road from the Plot of Shambhu Biswas to the HO Nilratan Biswas at Srirampur North |
99850 |
Construction of CC road from the Plot of Shambhu Biswas to the HO Nilratan Biswas at Srirampur North1 |
Completion of work |
-
latitude : 23.039674535393715,23.03968471940607
Longitude : 88.67752209305763,88.67754321545362
file name : Image_14122023141745547.png
|
2023-12-14 14:17:45.636378 |
273 |
75620939 |
Construction of CC road from the Plot of Shambhu Biswas to the HO Nilratan Biswas at Srirampur North |
99850 |
Construction of CC road from the Plot of Shambhu Biswas to the HO Nilratan Biswas at Srirampur North1 |
Completion of work |
-
latitude : 23.037563343532383,23.037580107338727
Longitude : 88.6775616556406,88.67751647718251
file name : Image_14122023120906566.png
|
2023-12-14 12:09:06.692204 |
274 |
75620939 |
Construction of CC road from the Plot of Shambhu Biswas to the HO Nilratan Biswas at Srirampur North |
99850 |
Construction of CC road from the Plot of Shambhu Biswas to the HO Nilratan Biswas at Srirampur North1 |
Completion of work |
-
latitude : 23.03759888280183,23.037739447318017
Longitude : 88.67771051824093,88.67770909331739
file name : Image_14122023120428549.png
|
2023-12-14 12:04:28.660197 |
275 |
75620939 |
Construction of CC road from the Plot of Shambhu Biswas to the HO Nilratan Biswas at Srirampur North |
99850 |
Construction of CC road from the Plot of Shambhu Biswas to the HO Nilratan Biswas at Srirampur North1 |
Completion of work |
-
latitude : 23.03969817236066,23.03971221204847,23.03973123896867
Longitude : 88.67731145583093,88.67759476415813,88.67751438170671
file name : Image_06122023143635594.png
|
2023-12-06 14:36:35.678971 |
276 |
75618103 |
Construction of Black Top road from Rajarmath Concret Brodge to HO Dilip Hira at Rajarmath. |
300000 |
Construction of Black Top road from Rajarmath Concret Brodge to HO Dilip Hira at Rajarmath.1 |
Roof laid |
-
latitude : 23.037709230557084,23.03770776372403
Longitude : 88.67794261313975,88.67793632671237
file name : Image_21082024193031766.png
|
2024-08-21 19:30:31.846787 |
277 |
75618103 |
Construction of Black Top road from Rajarmath Concret Brodge to HO Dilip Hira at Rajarmath. |
300000 |
Construction of Black Top road from Rajarmath Concret Brodge to HO Dilip Hira at Rajarmath.1 |
Plinth level |
-
latitude : 23.037700597196817,23.037410960532725
Longitude : 88.67771848104894,88.6776052415371
file name : Image_21082024192858448.png
|
2024-08-21 19:28:58.527197 |
278 |
75618103 |
Construction of Black Top road from Rajarmath Concret Brodge to HO Dilip Hira at Rajarmath. |
300000 |
Construction of Black Top road from Rajarmath Concret Brodge to HO Dilip Hira at Rajarmath.1 |
Completion of work |
-
latitude : 23.021463761106133,23.021431993693113,23.021396663971245
Longitude : 88.68215938098729,88.68210766464472,88.68207715451717
file name : Image_06122023143641169.png
|
2023-12-06 14:36:41.261456 |
279 |
75618103 |
Construction of Black Top road from Rajarmath Concret Brodge to HO Dilip Hira at Rajarmath. |
300000 |
Construction of Black Top road from Rajarmath Concret Brodge to HO Dilip Hira at Rajarmath.1 |
Completion of work |
-
latitude : 23.02141066174954,23.021370847709477
Longitude : 88.68209442123771,88.68208050727844
file name : Image_05072023125437048.png
|
2023-07-05 12:54:37.13287 |
280 |
75618623 |
Construction of Black Top road from HO Kabita Hira to HO Dulal Thakur at Rajarmath. |
300000 |
Construction of Black Top road from HO Kabita Hira to HO Dulal Thakur at Rajarmath.1 |
Roof laid |
-
latitude : 23.037679181434214,23.037679181434214
Longitude : 88.67782560177147,88.67782560177147
file name : Image_21082024194151200.png
|
2024-08-21 19:41:51.297222 |
281 |
75618623 |
Construction of Black Top road from HO Kabita Hira to HO Dulal Thakur at Rajarmath. |
300000 |
Construction of Black Top road from HO Kabita Hira to HO Dulal Thakur at Rajarmath.1 |
Plinth level |
-
latitude : 23.03758786059916,23.037585974670947
Longitude : 88.6777463927865,88.67774488404393
file name : Image_21082024193337502.png
|
2024-08-21 19:33:37.602547 |
282 |
75618623 |
Construction of Black Top road from HO Kabita Hira to HO Dulal Thakur at Rajarmath. |
300000 |
Construction of Black Top road from HO Kabita Hira to HO Dulal Thakur at Rajarmath.1 |
Completion of work |
-
latitude : 23.01999717950821,23.019985570572317,23.019967968575656
Longitude : 88.68073336780071,88.68080880492926,88.68079338222742
file name : Image_06122023152618034.png
|
2023-12-06 15:26:18.131848 |
283 |
75618623 |
Construction of Black Top road from HO Kabita Hira to HO Dulal Thakur at Rajarmath. |
300000 |
Construction of Black Top road from HO Kabita Hira to HO Dulal Thakur at Rajarmath.1 |
Completion of work |
-
latitude : 23.020454118959606,23.020449886098504
Longitude : 88.68123703636229,88.68122085928917
file name : Image_05072023130751098.png
|
2023-07-05 13:07:51.203678 |
284 |
46967366 |
Construction of CC road from the H/O Jiban Sarkar towards H/O Mihir Mondal at Ghoramara |
129770 |
Construction of CC road from the H/O Jiban Sarkar towards H/O Mihir Mondal at Ghoramara 1 |
Roof laid |
-
latitude : 23.0294744,23.0294744
Longitude : 88.6735393,88.6735393
file name : Image_31082022141221129.png
|
2022-08-31 14:12:21.217149 |
285 |
46967366 |
Construction of CC road from the H/O Jiban Sarkar towards H/O Mihir Mondal at Ghoramara |
129770 |
Construction of CC road from the H/O Jiban Sarkar towards H/O Mihir Mondal at Ghoramara 1 |
Roof laid |
-
latitude : 23.0295092,23.0295092,23.0295092
Longitude : 88.673492,88.673492,88.673492
file name : Image_09122023131944673.png
|
2023-12-09 13:19:44.771885 |
286 |
46967366 |
Construction of CC road from the H/O Jiban Sarkar towards H/O Mihir Mondal at Ghoramara |
129770 |
Construction of CC road from the H/O Jiban Sarkar towards H/O Mihir Mondal at Ghoramara 1 |
Roof laid |
-
latitude : 23.0294748,23.0294748
Longitude : 88.6735395,88.6735395
file name : Image_08062022113322285.png
|
2022-06-08 11:33:22.376118 |
287 |
46967366 |
Construction of CC road from the H/O Jiban Sarkar towards H/O Mihir Mondal at Ghoramara |
129770 |
Construction of CC road from the H/O Jiban Sarkar towards H/O Mihir Mondal at Ghoramara 1 |
Plinth level |
-
latitude : 23.0294735,23.0294735,23.0294735,23.0294735
Longitude : 88.673539,88.673539,88.6735387,88.6735387
file name : Image_06062022152904967.png
|
2022-06-06 15:29:05.055341 |
288 |
46967366 |
Construction of CC road from the H/O Jiban Sarkar towards H/O Mihir Mondal at Ghoramara |
129770 |
Construction of CC road from the H/O Jiban Sarkar towards H/O Mihir Mondal at Ghoramara 1 |
Plinth level |
-
latitude : 23.0294741,23.0294752,23.0294752
Longitude : 88.6735394,88.6735396,88.6735396
file name : Image_06062022135342994.png
|
2022-06-06 13:53:43.104771 |
289 |
46967366 |
Construction of CC road from the H/O Jiban Sarkar towards H/O Mihir Mondal at Ghoramara |
129770 |
Construction of CC road from the H/O Jiban Sarkar towards H/O Mihir Mondal at Ghoramara 1 |
Completion of work |
-
latitude : 23.0377334,23.0294736,23.0294736
Longitude : 88.6778031,88.6735298,88.6735301
file name : Image_03062022143500746.png
|
2022-06-03 14:35:00.84534 |
290 |
46967366 |
Construction of CC road from the H/O Jiban Sarkar towards H/O Mihir Mondal at Ghoramara |
129770 |
Construction of CC road from the H/O Jiban Sarkar towards H/O Mihir Mondal at Ghoramara 1 |
Completion of work |
-
latitude : 23.0294741,23.0294741
Longitude : 88.6735394,88.6735394
file name : Image_03062022143806597.png
|
2022-06-03 14:38:06.70029 |
291 |
46967366 |
Construction of CC road from the H/O Jiban Sarkar towards H/O Mihir Mondal at Ghoramara |
129770 |
Construction of CC road from the H/O Jiban Sarkar towards H/O Mihir Mondal at Ghoramara 1 |
Completion of work |
-
latitude : 23.0294744,23.0294752
Longitude : 88.6735393,88.6735397
file name : Image_06062022121126622.png
|
2022-06-06 12:11:26.724825 |
292 |
59459335 |
Sajal dhara scheme near Surya Shakti Sangha front of Prova roys house at Rajarmath |
966094 |
Sajal dhara scheme near Surya Shakti Sangha front of Prova roys house at Rajarmath1 |
Roof laid |
-
latitude : 23.0312193
Longitude : 88.6851275
file name : Image_15012024133848028.png
|
2024-01-15 13:38:48.11655 |
293 |
59459335 |
Sajal dhara scheme near Surya Shakti Sangha front of Prova roys house at Rajarmath |
966094 |
Sajal dhara scheme near Surya Shakti Sangha front of Prova roys house at Rajarmath1 |
Roof laid |
-
latitude : 23.0312193
Longitude : 88.6851275
file name : Image_08012024164804128.png
|
2024-01-08 16:48:04.206409 |
294 |
59459335 |
Sajal dhara scheme near Surya Shakti Sangha front of Prova roys house at Rajarmath |
966094 |
Sajal dhara scheme near Surya Shakti Sangha front of Prova roys house at Rajarmath1 |
Plinth level |
-
latitude : 23.0312216
Longitude : 88.6851257
file name : Image_08012024161931905.png
|
2024-01-08 16:19:31.993868 |
295 |
59459335 |
Sajal dhara scheme near Surya Shakti Sangha front of Prova roys house at Rajarmath |
966094 |
Sajal dhara scheme near Surya Shakti Sangha front of Prova roys house at Rajarmath1 |
Completion of work |
-
latitude : 23.0312193
Longitude : 88.6851275
file name : Image_08012024160729063.png
|
2024-01-08 16:07:29.150631 |
296 |
59459335 |
Sajal dhara scheme near Surya Shakti Sangha front of Prova roys house at Rajarmath |
966094 |
Sajal dhara scheme near Surya Shakti Sangha front of Prova roys house at Rajarmath1 |
Completion of work |
-
latitude : 23.031616508960724
Longitude : 88.6848442722112
file name : Image_08012024153925663.png
|
2024-01-08 15:39:25.748617 |
297 |
59459335 |
Sajal dhara scheme near Surya Shakti Sangha front of Prova roys house at Rajarmath |
966094 |
Sajal dhara scheme near Surya Shakti Sangha front of Prova roys house at Rajarmath1 |
Completion of work |
-
latitude : 23.031674469821155
Longitude : 88.68485726416111
file name : Image_08012024153513712.png
|
2024-01-08 15:35:13.820211 |
298 |
59459335 |
Sajal dhara scheme near Surya Shakti Sangha front of Prova roys house at Rajarmath |
966094 |
Sajal dhara scheme near Surya Shakti Sangha front of Prova roys house at Rajarmath1 |
Plinth level |
-
latitude : 23.031656867824495
Longitude : 88.68486614897847
file name : Image_08012024162056249.png
|
2024-01-08 16:20:56.338853 |
299 |
59459335 |
Sajal dhara scheme near Surya Shakti Sangha front of Prova roys house at Rajarmath |
966094 |
Sajal dhara scheme near Surya Shakti Sangha front of Prova roys house at Rajarmath1 |
Completion of work |
-
latitude : 23.031674469821155
Longitude : 88.68485726416111
file name : Image_08012024153413413.png
|
2024-01-08 15:34:13.50831 |
300 |
59459335 |
Sajal dhara scheme near Surya Shakti Sangha front of Prova roys house at Rajarmath |
966094 |
Sajal dhara scheme near Surya Shakti Sangha front of Prova roys house at Rajarmath1 |
Completion of work |
-
latitude : 23.031638050451875
Longitude : 88.6848339624703
file name : Image_08012024153405146.png
|
2024-01-08 15:34:05.249854 |
301 |
59258756 |
Construction of CC road from the H/o Khokon Sardar towards h/o Samir das at Srirampur north |
150000 |
Construction of CC road from the H/o Khokon Sardar towards h/o Samir das at Srirampur north1 |
Completion of work |
-
latitude : 23.03972558118403,23.039710745215416
Longitude : 88.67668172344565,88.6767259798944
file name : Image_14042023172041872.png
|
2023-04-14 17:20:41.954799 |
302 |
59258756 |
Construction of CC road from the H/o Khokon Sardar towards h/o Samir das at Srirampur north |
150000 |
Construction of CC road from the H/o Khokon Sardar towards h/o Samir das at Srirampur north1 |
Completion of work |
-
latitude : 23.039690754376352,23.03969268221408
Longitude : 88.67672287859023,88.67672514170408
file name : Image_06022023152154498.png
|
2023-02-06 15:21:54.598014 |
303 |
59258756 |
Construction of CC road from the H/o Khokon Sardar towards h/o Samir das at Srirampur north |
150000 |
Construction of CC road from the H/o Khokon Sardar towards h/o Samir das at Srirampur north1 |
Completion of work |
-
latitude : 23.0402262,23.0402218
Longitude : 88.6768627,88.6768656
file name : Image_06022023151155526.png
|
2023-02-06 15:11:55.606142 |
304 |
65997175 |
Operation & maintenance of drinking water supply system |
100000 |
Operation & maintenance of drinking water supply system10 |
Completion of work |
-
latitude : 23.037461922504008
Longitude : 88.67818971164525
file name : Image_14122022142504752.png
|
2022-12-14 14:25:04.849877 |