1 |
35094131 |
Improvement of Black Top road from the H/O- Gouranga Mondal to the main Gate of Sona Brick Field. |
303566 |
Improvement of Black Top road from the H/O- Gouranga Mondal to the main Gate of Sona Brick Field.1 |
Completion of work |
-
latitude : 23.467310392297804,23.467359887436032,23.467347188852727
Longitude : 88.48416558466852,88.48418846726418,88.48418595269322
file name : Image_05032021143455817.png
|
2021-03-05 14:34:55.914508 |
2 |
52413782 |
Installation of LED road light from the Dhubulia Bazar HO Sher Sing to the Shopping Mall at Dhubulia |
349977 |
Installation of LED road light from the Dhubulia Bazar HO Sher Sing to the Shopping Mall at Dhubulia1 |
Roof laid |
-
latitude : 23.491857
Longitude : 88.4470726
file name : Image_21092021142850967.png
|
2021-09-21 14:28:51.062158 |
3 |
52413782 |
Installation of LED road light from the Dhubulia Bazar HO Sher Sing to the Shopping Mall at Dhubulia |
349977 |
Installation of LED road light from the Dhubulia Bazar HO Sher Sing to the Shopping Mall at Dhubulia1 |
Plinth level |
-
latitude : 23.4918615
Longitude : 88.4471106
file name : Image_21092021142223198.png
|
2021-09-21 14:22:23.285976 |
4 |
52413782 |
Installation of LED road light from the Dhubulia Bazar HO Sher Sing to the Shopping Mall at Dhubulia |
349977 |
Installation of LED road light from the Dhubulia Bazar HO Sher Sing to the Shopping Mall at Dhubulia3 |
Completion of work |
-
latitude : 23.4918784
Longitude : 88.4472232
file name : Image_11092021130036957.png
|
2021-09-11 13:00:37.040914 |
5 |
52413878 |
Installation of LED road light from the HO Tapas Master to the Dhubulia Rail Station |
349977 |
Installation of LED road light from the HO Tapas Master to the Dhubulia Rail Station 1 |
Roof laid |
-
latitude : 23.487750249914825
Longitude : 88.44261632300913
file name : Image_21092021143436679.png
|
2021-09-21 14:34:36.772077 |
6 |
52413878 |
Installation of LED road light from the HO Tapas Master to the Dhubulia Rail Station |
349977 |
Installation of LED road light from the HO Tapas Master to the Dhubulia Rail Station 1 |
Plinth level |
-
latitude : 23.487722338177264
Longitude : 88.44265705905855
file name : Image_21092021143152246.png
|
2021-09-21 14:31:52.326648 |
7 |
52413878 |
Installation of LED road light from the HO Tapas Master to the Dhubulia Rail Station |
349977 |
Installation of LED road light from the HO Tapas Master to the Dhubulia Rail Station 5 |
Completion of work |
-
latitude : 23.48787262570113
Longitude : 88.44254088588059
file name : Image_18092021114519512.png
|
2021-09-18 11:45:19.6096 |
8 |
52413878 |
Installation of LED road light from the HO Tapas Master to the Dhubulia Rail Station |
349977 |
Installation of LED road light from the HO Tapas Master to the Dhubulia Rail Station 5 |
Completion of work |
-
latitude : 23.487815628759563
Longitude : 88.44255262054503
file name : Image_11092021130121191.png
|
2021-09-11 13:01:21.268578 |
9 |
52414615 |
Supply of LED flood light fixture under Dhubulia1 GP |
118912 |
Supply of LED flood light fixture under Dhubulia1 GP1 |
Plinth level |
-
latitude : 23.4861307
Longitude : 88.449314
file name : Image_19012022145658127.png
|
2022-01-19 14:56:58.288026 |
10 |
52414615 |
Supply of LED flood light fixture under Dhubulia1 GP |
118912 |
Supply of LED flood light fixture under Dhubulia1 GP1 |
Completion of work |
-
latitude : 23.4863051
Longitude : 88.4493341
file name : Image_19012022121333807.png
|
2022-01-19 12:13:33.978877 |
11 |
35100628 |
Purchase of road light materilas for repairing of street light under Dhubulia-1 G.P. |
350000 |
Purchase of road light materilas for repairing of street light under Dhubulia-1 G.P.1 |
Roof laid |
-
latitude : 23.484110701829195
Longitude : 88.45053009688854
file name : Image_08032022110947433.png
|
2022-03-08 11:09:47.517328 |
12 |
35100628 |
Purchase of road light materilas for repairing of street light under Dhubulia-1 G.P. |
350000 |
Purchase of road light materilas for repairing of street light under Dhubulia-1 G.P.1 |
Plinth level |
-
latitude : 23.48417712841183
Longitude : 88.45059413462877
file name : Image_22022022151207881.png
|
2022-02-22 15:12:07.962181 |
13 |
35100628 |
Purchase of road light materilas for repairing of street light under Dhubulia-1 G.P. |
350000 |
Purchase of road light materilas for repairing of street light under Dhubulia-1 G.P.1 |
Completion of work |
-
latitude : 23.484069546684623
Longitude : 88.45055214129388
file name : Image_22022022150846294.png
|
2022-02-22 15:08:46.369005 |
14 |
35035072 |
Improvement of C.Croad from the H/O-Firdos Mallick to the H/O- Tanchhar Sekh at Dhubulia. |
173000 |
Improvement of C.Croad from the H/O-Firdos Mallick to the H/O- Tanchhar Sekh at Dhubulia.1 |
Completion of work |
-
latitude : 23.479292448610067,23.479306362569332
Longitude : 88.44434768892825,88.44432480633259
file name : Image_08032022112717225.png
|
2022-03-08 11:27:17.324693 |
15 |
39071928 |
Purchase of Garbage Motor Van with hydraulic (T) |
350000 |
Purchase of Garbage Motor Van with hydraulic (T)1 |
Completion of work |
-
latitude : 23.448741666666667
Longitude : 88.53403000000002
file name : Image_30032022162348931.png
|
2022-03-30 16:23:49.022448 |
16 |
39071928 |
Purchase of Garbage Motor Van with hydraulic (T) |
350000 |
Purchase of Garbage Motor Van with hydraulic (T)1 |
Completion of work |
-
latitude : 23.4488683
Longitude : 88.5347723
file name : Image_20032022121313849.png
|
2022-03-20 12:13:13.949249 |
17 |
35068433 |
Improvement of C.C road from the H/O-Siraj Sekh to the H/O- Atul Naskar at Dhubulia Hatpara. |
66795 |
Improvement of C.C road from the H/O-Siraj Sekh to the H/O- Atul Naskar at Dhubulia Hatpara.1 |
Roof laid |
-
latitude : 23.479805295355618,23.479805295355618
Longitude : 88.45072380267084,88.45072380267084
file name : Image_13052022145100065.png
|
2022-05-13 14:51:00.183707 |
18 |
35068433 |
Improvement of C.C road from the H/O-Siraj Sekh to the H/O- Atul Naskar at Dhubulia Hatpara. |
66795 |
Improvement of C.C road from the H/O-Siraj Sekh to the H/O- Atul Naskar at Dhubulia Hatpara.1 |
Plinth level |
-
latitude : 23.479758985340595,23.47977004945278
Longitude : 88.45070754177868,88.45070167444646
file name : Image_06042022111337228.png
|
2022-04-06 11:13:37.320982 |
19 |
35068433 |
Improvement of C.C road from the H/O-Siraj Sekh to the H/O- Atul Naskar at Dhubulia Hatpara. |
66795 |
Improvement of C.C road from the H/O-Siraj Sekh to the H/O- Atul Naskar at Dhubulia Hatpara.1 |
Completion of work |
-
latitude : 23.4807073,23.479796745814383
Longitude : 88.4507458,88.45078147016466
file name : Image_08032022104612867.png
|
2022-03-08 10:46:12.994113 |
20 |
48478859 |
Construction of C.C. road from the H/O-Biswanath Das to the H/O-Suresh Pramanik at Dhubulia Ambagan. |
187998 |
Construction of C.C. road from the H/O-Biswanath Das to the H/O-Suresh Pramanik at Dhubulia Ambagan.1 |
Plinth level |
-
latitude : 23.48069784231484,23.48069784231484
Longitude : 88.44932385720313,88.44932385720313
file name : Image_11052022150824346.png
|
2022-05-11 15:08:24.449971 |
21 |
48478859 |
Construction of C.C. road from the H/O-Biswanath Das to the H/O-Suresh Pramanik at Dhubulia Ambagan. |
187998 |
Construction of C.C. road from the H/O-Biswanath Das to the H/O-Suresh Pramanik at Dhubulia Ambagan.1 |
Plinth level |
-
latitude : 23.48374935798347,23.48374935798347
Longitude : 88.44283433631063,88.44283433631063
file name : Image_10052022130054098.png
|
2022-05-10 13:00:54.199419 |
22 |
48478859 |
Construction of C.C. road from the H/O-Biswanath Das to the H/O-Suresh Pramanik at Dhubulia Ambagan. |
187998 |
Construction of C.C. road from the H/O-Biswanath Das to the H/O-Suresh Pramanik at Dhubulia Ambagan.1 |
Completion of work |
-
latitude : 23.483846462331712,23.483846462331712
Longitude : 88.44285344704986,88.44285344704986
file name : Image_10052022125120128.png
|
2022-05-10 12:51:20.254867 |
23 |
48474091 |
Construction of C.C.road from the H/O- Asgar Sekh to the H/O- Patal Sekh at Dhubulia Uttarpara |
63652 |
Construction of C.C.road from the H/O- Asgar Sekh to the H/O- Patal Sekh at Dhubulia Uttarpara1 |
Roof laid |
-
latitude : 23.48292034585029,23.48292034585029
Longitude : 88.44669730402529,88.44669730402529
file name : Image_27052022132741797.png
|
2022-05-27 13:27:41.858467 |
24 |
48474091 |
Construction of C.C.road from the H/O- Asgar Sekh to the H/O- Patal Sekh at Dhubulia Uttarpara |
63652 |
Construction of C.C.road from the H/O- Asgar Sekh to the H/O- Patal Sekh at Dhubulia Uttarpara1 |
Plinth level |
-
latitude : 23.483399,23.483399
Longitude : 88.4469299,88.4469299
file name : Image_18052022114408115.png
|
2022-05-18 11:44:08.202917 |
25 |
48474091 |
Construction of C.C.road from the H/O- Asgar Sekh to the H/O- Patal Sekh at Dhubulia Uttarpara |
63652 |
Construction of C.C.road from the H/O- Asgar Sekh to the H/O- Patal Sekh at Dhubulia Uttarpara1 |
Completion of work |
-
latitude : 23.482954585924745,23.482951358892024
Longitude : 88.44667408615351,88.4466695599258
file name : Image_30032022122009076.png
|
2022-03-30 12:20:09.17046 |
26 |
48487487 |
Construction of C.C road from the H/O-Bibhuti Mondal to the H/O-C. Debnath at Dhubulia Narkelbagan. |
102341 |
Construction of C.C road from the H/O-Bibhuti Mondal to the H/O-C. Debnath at Dhubulia Narkelbagan.1 |
Roof laid |
-
latitude : 23.4828256,23.4828256
Longitude : 88.4544692,88.4544692
file name : Image_27052022132134156.png
|
2022-05-27 13:21:34.223332 |
27 |
48487487 |
Construction of C.C road from the H/O-Bibhuti Mondal to the H/O-C. Debnath at Dhubulia Narkelbagan. |
102341 |
Construction of C.C road from the H/O-Bibhuti Mondal to the H/O-C. Debnath at Dhubulia Narkelbagan.1 |
Plinth level |
-
latitude : 23.4816858,23.4816858
Longitude : 88.452047,88.452047
file name : Image_27052022131623596.png
|
2022-05-27 13:16:23.655537 |
28 |
48487487 |
Construction of C.C road from the H/O-Bibhuti Mondal to the H/O-C. Debnath at Dhubulia Narkelbagan. |
102341 |
Construction of C.C road from the H/O-Bibhuti Mondal to the H/O-C. Debnath at Dhubulia Narkelbagan.1 |
Completion of work |
-
latitude : 23.48178820218891,23.48178820218891
Longitude : 88.45266127958894,88.45266127958894
file name : Image_27052022131226472.png
|
2022-05-27 13:12:26.541627 |
29 |
64828294 |
Operation & maintenance of community sanitary complex |
100000 |
Operation & maintenance of community sanitary complex1 |
Roof laid |
-
latitude : 23.4807535
Longitude : 88.4491908
file name : Image_09072024161156207.png
|
2024-07-09 16:11:56.298816 |
30 |
64828294 |
Operation & maintenance of community sanitary complex |
100000 |
Operation & maintenance of community sanitary complex1 |
Roof laid |
-
latitude : 23.48104720003903
Longitude : 88.44916728325188
file name : Image_26092022135827399.png
|
2022-09-26 13:58:27.487065 |
31 |
64828294 |
Operation & maintenance of community sanitary complex |
100000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 23.480602875351906
Longitude : 88.4490542113781
file name : Image_26092022135413924.png
|
2022-09-26 13:54:14.007268 |
32 |
64828294 |
Operation & maintenance of community sanitary complex |
100000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 23.4808572
Longitude : 88.4493261
file name : Image_26092022135144440.png
|
2022-09-26 13:51:44.526801 |
33 |
63838889 |
Cleaning of drain and garbage in different sansad under D-1 GP |
350000 |
Cleaning of drain and garbage in different sansad under D-1 GP1 |
Roof laid |
-
latitude : 23.4646605,23.4646605
Longitude : 88.4619619,88.4619619
file name : Image_11072024151655785.png
|
2024-07-11 15:16:55.887302 |
34 |
63838889 |
Cleaning of drain and garbage in different sansad under D-1 GP |
350000 |
Cleaning of drain and garbage in different sansad under D-1 GP1 |
Plinth level |
-
latitude : 23.4646653,23.4646653
Longitude : 88.4619588,88.4619588
file name : Image_11072024151301037.png
|
2024-07-11 15:13:01.23608 |
35 |
63838889 |
Cleaning of drain and garbage in different sansad under D-1 GP |
350000 |
Cleaning of drain and garbage in different sansad under D-1 GP1 |
Completion of work |
-
latitude : 23.480753,23.4807855
Longitude : 88.4490005,88.448972
file name : Image_16122022125403360.png
|
2022-12-16 12:54:03.453773 |
36 |
48510758 |
Repairing of cover pucca drain from the H/O- Hayder Halsana to the H/O- Shibu Modak at Battala |
349919 |
Repairing of cover pucca drain from the H/O- Hayder Halsana to the H/O- Shibu Modak at Battala1 |
Roof laid |
-
latitude : 23.4809546,23.4809546
Longitude : 88.4503019,88.4503019
file name : Image_09072024153621255.png
|
2024-07-09 15:36:21.365062 |
37 |
48510758 |
Repairing of cover pucca drain from the H/O- Hayder Halsana to the H/O- Shibu Modak at Battala |
349919 |
Repairing of cover pucca drain from the H/O- Hayder Halsana to the H/O- Shibu Modak at Battala1 |
Roof laid |
-
latitude : 23.4804443,23.4804443
Longitude : 88.4490957,88.4490957
file name : Image_31012023121121249.png
|
2023-01-31 12:11:21.301304 |
38 |
48510758 |
Repairing of cover pucca drain from the H/O- Hayder Halsana to the H/O- Shibu Modak at Battala |
349919 |
Repairing of cover pucca drain from the H/O- Hayder Halsana to the H/O- Shibu Modak at Battala1 |
Plinth level |
-
latitude : 23.4810515,23.4810515
Longitude : 88.4504542,88.4504542
file name : Image_24012023120643742.png
|
2023-01-24 12:06:43.806265 |
39 |
48510758 |
Repairing of cover pucca drain from the H/O- Hayder Halsana to the H/O- Shibu Modak at Battala |
349919 |
Repairing of cover pucca drain from the H/O- Hayder Halsana to the H/O- Shibu Modak at Battala1 |
Completion of work |
-
latitude : 23.4810552,23.4810552
Longitude : 88.450394,88.450394
file name : Image_13012023121119681.png
|
2023-01-13 12:11:19.746885 |
40 |
64708905 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.468664027750492
Longitude : 88.48240622319281
file name : Image_09022023134713258.png
|
2023-02-09 13:47:13.342316 |
41 |
64708905 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.468664027750492
Longitude : 88.48240622319281
file name : Image_09022023132915699.png
|
2023-02-09 13:29:15.774371 |
42 |
48473565 |
Installation of Butterfly Multi Coloured SMD street light at Dhubulia 3/25 No Group |
215000 |
Installation of Butterfly Multi Coloured SMD street light at Dhubulia 3/25 No Group1 |
Completion of work |
-
latitude : 23.476699255406857
Longitude : 88.46497144550085
file name : Image_15022023161300648.png
|
2023-02-15 16:13:00.70322 |
43 |
34923487 |
Improvement of C.C road from the H/O- Krishna Halder to N.H.-34 at Dhubulia Arobindapalli. |
100990 |
Improvement of C.C road from the H/O- Krishna Halder to N.H.-34 at Dhubulia Arobindapalli.1 |
Roof laid |
-
latitude : 23.4874581,23.487438
Longitude : 88.4495645,88.4495725
file name : Image_17032022162719261.png
|
2022-03-17 16:27:19.364841 |
44 |
34923487 |
Improvement of C.C road from the H/O- Krishna Halder to N.H.-34 at Dhubulia Arobindapalli. |
100990 |
Improvement of C.C road from the H/O- Krishna Halder to N.H.-34 at Dhubulia Arobindapalli.1 |
Plinth level |
-
latitude : 23.4875796,23.4878186
Longitude : 88.449667,88.4497434
file name : Image_17032022105642945.png
|
2022-03-17 10:56:43.058763 |
45 |
34923487 |
Improvement of C.C road from the H/O- Krishna Halder to N.H.-34 at Dhubulia Arobindapalli. |
100990 |
Improvement of C.C road from the H/O- Krishna Halder to N.H.-34 at Dhubulia Arobindapalli.1 |
Completion of work |
-
latitude : 23.4876615,23.4876306
Longitude : 88.4497433,88.4497206
file name : Image_18022022114918075.png
|
2022-02-18 11:49:18.190254 |
46 |
35068991 |
Improvement of C.C road from the H/O- Amiya Roy to the H/O- Nanda Roy at Banagram. |
241000 |
Improvement of C.C road from the H/O- Amiya Roy to the H/O- Nanda Roy at Banagram.1 |
Roof laid |
-
latitude : 23.457013475708663,23.457017624750733
Longitude : 88.46097386442125,88.46098065376282
file name : Image_21022022115506143.png
|
2022-02-21 11:55:06.265591 |
47 |
35068991 |
Improvement of C.C road from the H/O- Amiya Roy to the H/O- Nanda Roy at Banagram. |
241000 |
Improvement of C.C road from the H/O- Amiya Roy to the H/O- Nanda Roy at Banagram.1 |
Plinth level |
-
latitude : 23.456992814317346,23.4569770982489,23.457042016088963
Longitude : 88.46102306619287,88.46095182001591,88.46099641174078
file name : Image_21022022114833050.png
|
2022-02-21 11:48:33.16195 |
48 |
35068991 |
Improvement of C.C road from the H/O- Amiya Roy to the H/O- Nanda Roy at Banagram. |
241000 |
Improvement of C.C road from the H/O- Amiya Roy to the H/O- Nanda Roy at Banagram.1 |
Completion of work |
-
latitude : 23.456993610598147,23.457079608924687
Longitude : 88.46100085414946,88.46101057715714
file name : Image_18022022113048380.png
|
2022-02-18 11:30:48.487611 |
49 |
34943268 |
Improvement of C.C road from the H/O- Dwijen Ghosh to the H/O-Sridam Ghosh at Hansadanga. |
107483 |
Improvement of C.C road from the H/O- Dwijen Ghosh to the H/O-Sridam Ghosh at Hansadanga.1 |
Roof laid |
-
latitude : 23.4657984,23.4657984
Longitude : 88.4672234,88.4672234
file name : Image_05042022152922252.png
|
2022-04-05 15:29:22.362395 |
50 |
34943268 |
Improvement of C.C road from the H/O- Dwijen Ghosh to the H/O-Sridam Ghosh at Hansadanga. |
107483 |
Improvement of C.C road from the H/O- Dwijen Ghosh to the H/O-Sridam Ghosh at Hansadanga.1 |
Plinth level |
-
latitude : 23.464892716147006,23.4649016847834
Longitude : 88.46719491295516,88.46723799593747
file name : Image_23032022110927601.png
|
2022-03-23 11:09:27.69581 |
51 |
34943268 |
Improvement of C.C road from the H/O- Dwijen Ghosh to the H/O-Sridam Ghosh at Hansadanga. |
107483 |
Improvement of C.C road from the H/O- Dwijen Ghosh to the H/O-Sridam Ghosh at Hansadanga.1 |
Completion of work |
-
latitude : 23.4652938,23.4652938
Longitude : 88.4667638,88.4667638
file name : Image_21032022102512569.png
|
2022-03-21 10:25:12.670848 |
52 |
35071368 |
Improvement of C.Croad from the H/O- Bishnu Roy to the H/O-Shibu Das at Dhubulia. |
172000 |
Improvement of C.Croad from the H/O- Bishnu Roy to the H/O-Shibu Das at Dhubulia.1 |
Roof laid |
-
latitude : 23.488096380606294,23.4906136
Longitude : 88.44933978281915,88.4543149
file name : Image_17032022174910421.png
|
2022-03-17 17:49:10.529572 |
53 |
35071368 |
Improvement of C.Croad from the H/O- Bishnu Roy to the H/O-Shibu Das at Dhubulia. |
172000 |
Improvement of C.Croad from the H/O- Bishnu Roy to the H/O-Shibu Das at Dhubulia.1 |
Completion of work |
-
latitude : 23.4900073,23.4899746
Longitude : 88.4542193,88.4543272
file name : Image_17032022132740033.png
|
2022-03-17 13:27:40.13032 |
54 |
35071368 |
Improvement of C.Croad from the H/O- Bishnu Roy to the H/O-Shibu Das at Dhubulia. |
172000 |
Improvement of C.Croad from the H/O- Bishnu Roy to the H/O-Shibu Das at Dhubulia.1 |
Completion of work |
-
latitude : 23.4899411,23.4899231
Longitude : 88.4543525,88.4543828
file name : Image_08032022111619693.png
|
2022-03-08 11:16:19.815284 |
55 |
57663943 |
Construction of B.T road from H/O Narayan Biswas to H/O Swapan Mitra at 3/25 |
200000 |
Construction of B.T road from H/O Narayan Biswas to H/O Swapan Mitra at 3/251 |
Completion of work |
-
latitude : 23.4836236,23.4836236
Longitude : 88.4602519,88.4602519
file name : Image_22032023121445650.png
|
2023-03-22 12:14:45.716703 |
56 |
47977604 |
Construction of Tube-well platform with soak pit of P.H.E. water Tap in different sansad under D-1 G |
350000 |
Construction of Tube-well platform with soak pit of P.H.E. water Tap in different sansad under D-1 G1 |
Roof laid |
-
latitude : 23.47989267669618
Longitude : 88.45222759991884
file name : Image_11072024143422114.png
|
2024-07-11 14:34:22.200139 |
57 |
47977604 |
Construction of Tube-well platform with soak pit of P.H.E. water Tap in different sansad under D-1 G |
350000 |
Construction of Tube-well platform with soak pit of P.H.E. water Tap in different sansad under D-1 G1 |
Roof laid |
-
latitude : 23.4779796
Longitude : 88.4497903
file name : Image_20032023140708324.png
|
2023-03-20 14:07:08.38261 |
58 |
57836790 |
Construction of Cement Concrete road from H/O Himadri Chakaraborty to H/O Ajoy Saha at Bazar Colony |
135000 |
Construction of Cement Concrete road from H/O Himadri Chakaraborty to H/O Ajoy Saha at Bazar Colony1 |
Completion of work |
-
latitude : 23.4939135,23.4939135
Longitude : 88.4478844,88.4478844
file name : Image_26042023132150913.png
|
2023-04-26 13:21:51.004171 |
59 |
63834666 |
Construction of Toilet at Dhubulia Primary Health Centre at Dhubulia Kanthalbagan |
320000 |
Construction of Toilet at Dhubulia Primary Health Centre at Dhubulia Kanthalbagan1 |
Plinth level |
-
latitude : 23.4894962
Longitude : 88.4495329
file name : Image_03052023122022763.png
|
2023-05-03 12:20:22.842183 |
60 |
63834666 |
Construction of Toilet at Dhubulia Primary Health Centre at Dhubulia Kanthalbagan |
320000 |
Construction of Toilet at Dhubulia Primary Health Centre at Dhubulia Kanthalbagan1 |
Roof laid |
-
latitude : 23.4895786
Longitude : 88.4497099
file name : Image_03052023122404685.png
|
2023-05-03 12:24:04.808768 |
61 |
66731688 |
Installation of Mini High Mast Tower light in front of dhubulia Durga Mandir at Nataji Palli |
151000 |
Installation of Mini High Mast Tower light in front of dhubulia Durga Mandir at Nataji Palli1 |
Roof laid |
-
latitude : 23.4911854
Longitude : 88.4528506
file name : Image_11072024162141744.png
|
2024-07-11 16:21:41.84433 |
62 |
66731688 |
Installation of Mini High Mast Tower light in front of dhubulia Durga Mandir at Nataji Palli |
151000 |
Installation of Mini High Mast Tower light in front of dhubulia Durga Mandir at Nataji Palli1 |
Plinth level |
-
latitude : 23.4855336
Longitude : 88.4583514
file name : Image_11072024160241100.png
|
2024-07-11 16:02:41.226508 |
63 |
66731688 |
Installation of Mini High Mast Tower light in front of dhubulia Durga Mandir at Nataji Palli |
151000 |
Installation of Mini High Mast Tower light in front of dhubulia Durga Mandir at Nataji Palli1 |
Completion of work |
-
latitude : 23.4910818
Longitude : 88.4532998
file name : Image_23032023135247130.png
|
2023-03-23 13:52:47.185284 |
64 |
57829269 |
Construction of Cement Concrete road from the Moti Pukur to H/O Biren Mondal at Narkelbagan |
180000 |
Construction of Cement Concrete road from the Moti Pukur to H/O Biren Mondal at Narkelbagan1 |
Roof laid |
-
latitude : 23.479048158042133,23.479048158042133
Longitude : 88.45357800833881,88.45357800833881
file name : Image_27042023160656840.png
|
2023-04-27 16:06:56.938742 |
65 |
57829269 |
Construction of Cement Concrete road from the Moti Pukur to H/O Biren Mondal at Narkelbagan |
180000 |
Construction of Cement Concrete road from the Moti Pukur to H/O Biren Mondal at Narkelbagan1 |
Plinth level |
-
latitude : 23.47899346612394,23.478993508033454
Longitude : 88.45352017320693,88.45352000556886
file name : Image_27042023160051555.png
|
2023-04-27 16:00:51.890508 |
66 |
57829269 |
Construction of Cement Concrete road from the Moti Pukur to H/O Biren Mondal at Narkelbagan |
180000 |
Construction of Cement Concrete road from the Moti Pukur to H/O Biren Mondal at Narkelbagan1 |
Completion of work |
-
latitude : 23.47895671147853,23.47895671147853
Longitude : 88.45370206050575,88.45370206050575
file name : Image_25042023143900652.png
|
2023-04-25 14:39:00.718286 |
67 |
57840372 |
Purchase of road light mat. for repairing of street light in different sansad under Dhubulia 1 G.P |
200000 |
Purchase of road light mat. for repairing of street light in different sansad under Dhubulia 1 G.P1 |
Completion of work |
-
latitude : 23.4845156
Longitude : 88.4494526
file name : Image_27042023162831244.png
|
2023-04-27 16:28:31.366227 |
68 |
66244310 |
Water Supply to villages |
350000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 23.4808437
Longitude : 88.4493924
file name : Image_18042023132627109.png
|
2023-04-18 13:26:27.150068 |
69 |
66244310 |
Water Supply to villages |
350000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.4807708
Longitude : 88.4492636
file name : Image_12042023163411638.png
|
2023-04-12 16:34:11.755688 |
70 |
57876908 |
Construction of Ganga Water Tapkal Platform with Soak pit in sansad no 6.&7 |
350000 |
Construction of Ganga Water Tapkal Platform with Soak pit in sansad no 6.&71 |
Roof laid |
-
latitude : 23.4836151
Longitude : 88.4492022
file name : Image_15052023150549718.png
|
2023-05-15 15:05:49.77282 |
71 |
57876908 |
Construction of Ganga Water Tapkal Platform with Soak pit in sansad no 6.&7 |
350000 |
Construction of Ganga Water Tapkal Platform with Soak pit in sansad no 6.&71 |
Completion of work |
-
latitude : 23.4845132
Longitude : 88.4494504
file name : Image_27042023162256222.png
|
2023-04-27 16:22:56.289167 |
72 |
57876908 |
Construction of Ganga Water Tapkal Platform with Soak pit in sansad no 6.&7 |
350000 |
Construction of Ganga Water Tapkal Platform with Soak pit in sansad no 6.&71 |
Plinth level |
-
latitude : 23.483577696606517
Longitude : 88.44954907894135
file name : Image_27042023162509996.png
|
2023-04-27 16:25:10.064047 |
73 |
57877665 |
Construction of Ganga Water Tapkal platform with soak pit in sansad no 8 &9 &10 |
347125 |
Construction of Ganga Water Tapkal platform with soak pit in sansad no 8 &9 &101 |
Completion of work |
-
latitude : 23.4923626
Longitude : 88.4483485
file name : Image_31052023153135774.png
|
2023-05-31 15:31:35.836795 |
74 |
57889725 |
Construction of Cover Pucca Drain from H/O Idris Sk to H/O Manik Dey at Belgaon Hatatpara |
294965 |
Construction of Cover Pucca Drain from H/O Idris Sk to H/O Manik Dey at Belgaon Hatatpara1 |
Completion of work |
-
latitude : 23.47538132686168,23.475362048484385
Longitude : 88.4670033864677,88.4670908935368
file name : Image_09062023145851383.png
|
2023-06-09 14:58:51.452019 |
75 |
57863173 |
Installation of Water Tank with pipe line for supply of purified water with soak pit Battala Maktab |
250000 |
Installation of Water Tank with pipe line for supply of purified water with soak pit Battala Maktab1 |
Plinth level |
-
latitude : 23.482049256563187,23.482049256563187
Longitude : 88.44722494482994,88.44722494482994
file name : Image_31052023134906268.png
|
2023-05-31 13:49:06.330327 |
76 |
57863173 |
Installation of Water Tank with pipe line for supply of purified water with soak pit Battala Maktab |
250000 |
Installation of Water Tank with pipe line for supply of purified water with soak pit Battala Maktab1 |
Completion of work |
-
latitude : 23.4819438,23.4819438
Longitude : 88.4474584,88.4474584
file name : Image_02052023143649264.png
|
2023-05-02 14:36:49.332154 |
77 |
73484812 |
Construction of Black Top road from the house of Swapan Samadder twards the house of Lakhkhi Day |
272569 |
Construction of Black Top road from the house of Swapan Samadder twards the house of Lakhkhi Day1 |
Roof laid |
-
latitude : 23.4857778,23.4857778
Longitude : 88.4584604,88.4584604
file name : Image_31052023152036385.png
|
2023-05-31 15:20:36.459575 |
78 |
73484812 |
Construction of Black Top road from the house of Swapan Samadder twards the house of Lakhkhi Day |
272569 |
Construction of Black Top road from the house of Swapan Samadder twards the house of Lakhkhi Day1 |
Plinth level |
-
latitude : 23.48583255428821,23.48583255428821
Longitude : 88.45832308754325,88.45832308754325
file name : Image_31052023151816161.png
|
2023-05-31 15:18:16.225697 |
79 |
73484812 |
Construction of Black Top road from the house of Swapan Samadder twards the house of Lakhkhi Day |
272569 |
Construction of Black Top road from the house of Swapan Samadder twards the house of Lakhkhi Day1 |
Completion of work |
-
latitude : 23.4857375,23.48624
Longitude : 88.4585559,88.4577997
file name : Image_31052023151544638.png
|
2023-05-31 15:15:44.707209 |
80 |
39071999 |
Construction of cover pucca drain from the H/O-Kangsha Bag to the H/O- Jinnath Sk at Hansadanga |
350000 |
Construction of cover pucca drain from the H/O-Kangsha Bag to the H/O- Jinnath Sk at Hansadanga1 |
Roof laid |
-
latitude : 23.46492444165051,23.46492444165051
Longitude : 88.46152765676379,88.46152765676379
file name : Image_07042022161514764.png
|
2022-04-07 16:15:14.857914 |
81 |
39071999 |
Construction of cover pucca drain from the H/O-Kangsha Bag to the H/O- Jinnath Sk at Hansadanga |
350000 |
Construction of cover pucca drain from the H/O-Kangsha Bag to the H/O- Jinnath Sk at Hansadanga1 |
Plinth level |
-
latitude : 23.4806721,23.4806721
Longitude : 88.448996,88.448996
file name : Image_22032022135210520.png
|
2022-03-22 13:52:10.633555 |
82 |
39071999 |
Construction of cover pucca drain from the H/O-Kangsha Bag to the H/O- Jinnath Sk at Hansadanga |
350000 |
Construction of cover pucca drain from the H/O-Kangsha Bag to the H/O- Jinnath Sk at Hansadanga1 |
Completion of work |
-
latitude : 23.464931440539658,23.464965177699924
Longitude : 88.4614666365087,88.46149245277047
file name : Image_08032022104728095.png
|
2022-03-08 10:47:28.273565 |
83 |
61120686 |
Infrastructure development work of Rural Solid Waste Management at Kanthaliamath Chowgachha |
600000 |
Infrastructure development work of Rural Solid Waste Management at Kanthaliamath Chowgachha 1 |
Roof laid |
-
latitude : 23.480073851533234
Longitude : 88.44898137263954
file name : Image_29092022131009447.png
|
2022-09-29 13:10:09.485665 |
84 |
61120686 |
Infrastructure development work of Rural Solid Waste Management at Kanthaliamath Chowgachha |
600000 |
Infrastructure development work of Rural Solid Waste Management at Kanthaliamath Chowgachha 1 |
Plinth level |
-
latitude : 23.456194018945098
Longitude : 88.44664189964533
file name : Image_18072022163741199.png
|
2022-07-18 16:37:41.286292 |
85 |
61120686 |
Infrastructure development work of Rural Solid Waste Management at Kanthaliamath Chowgachha |
600000 |
Infrastructure development work of Rural Solid Waste Management at Kanthaliamath Chowgachha 1 |
Completion of work |
-
latitude : 23.47480310127139
Longitude : 88.52492703124881
file name : Image_13072022153759906.png
|
2022-07-13 15:37:59.983679 |
86 |
57893774 |
Construction of Dust Bin at Dhubulia Health Centre at Kanthalbagan |
218000 |
Construction of Dust Bin at Dhubulia Health Centre at Kanthalbagan1 |
Plinth level |
-
latitude : 23.4892633
Longitude : 88.4492443
file name : Image_06062023145650221.png
|
2023-06-06 14:56:50.281443 |
87 |
57893774 |
Construction of Dust Bin at Dhubulia Health Centre at Kanthalbagan |
218000 |
Construction of Dust Bin at Dhubulia Health Centre at Kanthalbagan1 |
Completion of work |
-
latitude : 23.4891439
Longitude : 88.4494067
file name : Image_06062023145432364.png
|
2023-06-06 14:54:32.417264 |
88 |
57668832 |
Construction of Cement Concrete road from H/O Tapan Ghosh to pond of Babu Ghosh at Hansadanga |
131385 |
Construction of Cement Concrete road from H/O Tapan Ghosh to pond of Babu Ghosh at Hansadanga1 |
Roof laid |
-
latitude : 23.4656194,23.4656194
Longitude : 88.4656542,88.4656542
file name : Image_08062023135745833.png
|
2023-06-08 13:57:45.892596 |
89 |
57668832 |
Construction of Cement Concrete road from H/O Tapan Ghosh to pond of Babu Ghosh at Hansadanga |
131385 |
Construction of Cement Concrete road from H/O Tapan Ghosh to pond of Babu Ghosh at Hansadanga1 |
Roof laid |
-
latitude : 23.4656197,23.4656197
Longitude : 88.46565,88.46565
file name : Image_08062023135435807.png
|
2023-06-08 13:54:35.868417 |
90 |
57668832 |
Construction of Cement Concrete road from H/O Tapan Ghosh to pond of Babu Ghosh at Hansadanga |
131385 |
Construction of Cement Concrete road from H/O Tapan Ghosh to pond of Babu Ghosh at Hansadanga1 |
Plinth level |
-
latitude : 23.4656161,23.4656161
Longitude : 88.4656457,88.4656457
file name : Image_08062023134802378.png
|
2023-06-08 13:48:02.43742 |
91 |
57668832 |
Construction of Cement Concrete road from H/O Tapan Ghosh to pond of Babu Ghosh at Hansadanga |
131385 |
Construction of Cement Concrete road from H/O Tapan Ghosh to pond of Babu Ghosh at Hansadanga1 |
Completion of work |
-
latitude : 23.46565,23.4656203
Longitude : 88.4657191,88.4656569
file name : Image_06062023132409611.png
|
2023-06-06 13:24:09.681797 |
92 |
73494671 |
Construction of CC road from the house of Madan Mallick towards Fantu Mallick |
34700 |
Construction of CC road from the house of Madan Mallick towards Fantu Mallick1 |
Roof laid |
-
latitude : 23.4808097,23.4808097
Longitude : 88.4467316,88.4467316
file name : Image_13062023122523858.png
|
2023-06-13 12:25:23.918786 |
93 |
73494671 |
Construction of CC road from the house of Madan Mallick towards Fantu Mallick |
34700 |
Construction of CC road from the house of Madan Mallick towards Fantu Mallick1 |
Plinth level |
-
latitude : 23.4807752,23.4807752
Longitude : 88.4467386,88.4467386
file name : Image_13062023121516914.png
|
2023-06-13 12:15:16.981408 |
94 |
73494671 |
Construction of CC road from the house of Madan Mallick towards Fantu Mallick |
34700 |
Construction of CC road from the house of Madan Mallick towards Fantu Mallick1 |
Completion of work |
-
latitude : 23.4810199,23.4810199
Longitude : 88.4467083,88.4467083
file name : Image_09062023140714858.png
|
2023-06-09 14:07:14.922646 |
95 |
73490855 |
Instalation of Mini High Mast Street Light near Dhubulia Samaj Sebak Club |
174124 |
Instalation of Mini High Mast Street Light near Dhubulia Samaj Sebak Club1 |
Roof laid |
-
latitude : 23.4912871
Longitude : 88.4562496
file name : Image_11072024161743312.png
|
2024-07-11 16:17:43.401288 |
96 |
73490855 |
Instalation of Mini High Mast Street Light near Dhubulia Samaj Sebak Club |
174124 |
Instalation of Mini High Mast Street Light near Dhubulia Samaj Sebak Club1 |
Plinth level |
-
latitude : 23.4912958
Longitude : 88.4561698
file name : Image_11072024161202649.png
|
2024-07-11 16:12:02.738996 |
97 |
73490855 |
Instalation of Mini High Mast Street Light near Dhubulia Samaj Sebak Club |
174124 |
Instalation of Mini High Mast Street Light near Dhubulia Samaj Sebak Club1 |
Plinth level |
-
latitude : 23.4912852
Longitude : 88.4562426
file name : Image_11072024161147431.png
|
2024-07-11 16:11:47.516 |
98 |
73490855 |
Instalation of Mini High Mast Street Light near Dhubulia Samaj Sebak Club |
174124 |
Instalation of Mini High Mast Street Light near Dhubulia Samaj Sebak Club1 |
Completion of work |
-
latitude : 23.4927058
Longitude : 88.4545054
file name : Image_09062023134444045.png
|
2023-06-09 13:44:44.106609 |
99 |
73488302 |
Instalation of Mini High Mast Street Light near Dolimoula Health Sub Center |
174124 |
Instalation of Mini High Mast Street Light near Dolimoula Health Sub Center1 |
Completion of work |
-
latitude : 23.4636011
Longitude : 88.4706315
file name : Image_09062023125931201.png
|
2023-06-09 12:59:31.261202 |
100 |
73498316 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.4940513
Longitude : 88.451152
file name : Image_04072024132503327.png
|
2024-07-04 13:25:03.426962 |
101 |
73498316 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.4940651
Longitude : 88.4511515
file name : Image_01072024134253337.png
|
2024-07-01 13:42:53.578345 |
102 |
73498316 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.4939222
Longitude : 88.4507196
file name : Image_09062023135010417.png
|
2023-06-09 13:50:10.478279 |
103 |
57667135 |
Construction of Cement Concrete road from the H/O Sunil Santra to the H/O Okiya Bibi at Hansadanga |
99000 |
Construction of Cement Concrete road from the H/O Sunil Santra to the H/O Okiya Bibi at Hansadanga1 |
Completion of work |
-
latitude : 23.4645681,23.4645681
Longitude : 88.4626136,88.4626136
file name : Image_09062023131847612.png
|
2023-06-09 13:18:47.678671 |
104 |
57883669 |
Construction of Dalimoula Suswasthya Kendra at Dalimoula Under D-1 G.P |
320000 |
Construction of Dalimoula Suswasthya Kendra at Dalimoula Under D-1 G.P1 |
Plinth level |
-
latitude : 23.4636017
Longitude : 88.4706314
file name : Image_22052023140847300.png
|
2023-05-22 14:08:47.358957 |
105 |
57883669 |
Construction of Dalimoula Suswasthya Kendra at Dalimoula Under D-1 G.P |
320000 |
Construction of Dalimoula Suswasthya Kendra at Dalimoula Under D-1 G.P1 |
Completion of work |
-
latitude : 23.4636021
Longitude : 88.4706316
file name : Image_22052023140413254.png
|
2023-05-22 14:04:13.320676 |
106 |
68092776 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.484787540510297
Longitude : 88.44496208243072
file name : Image_30122023124133639.png
|
2023-12-30 12:41:33.694891 |
107 |
68092776 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.484756276011467
Longitude : 88.44503693282604
file name : Image_15122023135138018.png
|
2023-12-15 13:51:38.07409 |
108 |
68092776 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.484627990983427
Longitude : 88.44501396641135
file name : Image_18112023124945977.png
|
2023-11-18 12:49:46.035553 |
109 |
68096122 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.4634975
Longitude : 88.4706786
file name : Image_20122023125927184.png
|
2023-12-20 12:59:27.235005 |
110 |
68096122 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.46340974792838
Longitude : 88.47078572027385
file name : Image_16122023142504703.png
|
2023-12-16 14:25:04.759058 |
111 |
68096122 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.463447047397494
Longitude : 88.47080374136567
file name : Image_06112023151408378.png
|
2023-11-06 15:14:08.540594 |
112 |
68090474 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.4844064
Longitude : 88.4491099
file name : Image_28122023141834594.png
|
2023-12-28 14:18:34.658377 |
113 |
68090474 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.4837361
Longitude : 88.4602527
file name : Image_16122023143738608.png
|
2023-12-16 14:37:38.671268 |
114 |
68090474 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.48341253120452
Longitude : 88.46010315231979
file name : Image_06112023152652724.png
|
2023-11-06 15:26:52.807606 |
115 |
68190748 |
Construction of roads |
148360 |
Construction of roads1 |
Roof laid |
-
latitude : 23.478353465907276,23.478350113146007,23.47835736349225
Longitude : 88.44491078518331,88.44491916708648,88.4449564665556
file name : Image_17112023120203112.png
|
2023-11-17 12:02:03.233383 |
116 |
68190748 |
Construction of roads |
148360 |
Construction of roads1 |
Plinth level |
-
latitude : 23.479372831061482,23.479372831061482
Longitude : 88.45226875506341,88.45226875506341
file name : Image_16102023153943283.png
|
2023-10-16 15:39:43.339575 |
117 |
68190748 |
Construction of roads |
148360 |
Construction of roads1 |
Completion of work |
-
latitude : 23.47839055582881,23.47839055582881,23.47839055582881,23.47839055582881
Longitude : 88.44491187483072,88.44491187483072,88.44491187483072,88.44491187483072
file name : Image_12102023150058810.png
|
2023-10-12 15:00:58.877026 |
118 |
68191022 |
Construction of roads |
125971 |
Construction of roads1 |
Roof laid |
-
latitude : 23.4822539,23.4822539
Longitude : 88.4457285,88.4457285
file name : Image_17112023120752387.png
|
2023-11-17 12:07:52.453954 |
119 |
68191022 |
Construction of roads |
125971 |
Construction of roads1 |
Plinth level |
-
latitude : 23.4822447,23.4822456,23.4822456
Longitude : 88.4456697,88.4456709,88.4456709
file name : Image_16102023154032454.png
|
2023-10-16 15:40:32.510895 |
120 |
68191022 |
Construction of roads |
125971 |
Construction of roads1 |
Completion of work |
-
latitude : 23.4822578,23.4822578
Longitude : 88.4456946,88.4456946
file name : Image_12102023150720788.png
|
2023-10-12 15:07:20.845733 |
121 |
68191725 |
Construction of roads |
146690 |
Construction of roads1 |
Roof laid |
-
latitude : 23.4796459,23.4796459
Longitude : 88.4524427,88.4524427
file name : Image_17112023115553256.png
|
2023-11-17 11:55:53.320759 |
122 |
68191725 |
Construction of roads |
146690 |
Construction of roads1 |
Roof laid |
-
latitude : 23.4796458,23.4796458
Longitude : 88.4524435,88.4524435
file name : Image_17112023115447965.png
|
2023-11-17 11:54:48.025678 |
123 |
68191725 |
Construction of roads |
146690 |
Construction of roads1 |
Plinth level |
-
latitude : 23.4796398,23.4796398
Longitude : 88.4524293,88.4524293
file name : Image_16102023152824630.png
|
2023-10-16 15:28:24.693134 |
124 |
68191725 |
Construction of roads |
146690 |
Construction of roads1 |
Completion of work |
-
latitude : 23.479516287334263,23.479516287334263
Longitude : 88.45218728296459,88.45218728296459
file name : Image_12102023151648290.png
|
2023-10-12 15:16:48.428528 |
125 |
68249148 |
Electricity connection /Installation of Solar Energy |
163849 |
Electricity connection /Installation of Solar Energy1 |
Roof laid |
-
latitude : 23.4851393
Longitude : 88.4502576
file name : Image_17112023132932394.png
|
2023-11-17 13:29:32.452905 |
126 |
68249148 |
Electricity connection /Installation of Solar Energy |
163849 |
Electricity connection /Installation of Solar Energy1 |
Plinth level |
-
latitude : 23.485207
Longitude : 88.4502481
file name : Image_17112023132641156.png
|
2023-11-17 13:26:41.215351 |
127 |
68249148 |
Electricity connection /Installation of Solar Energy |
163849 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 23.4852422
Longitude : 88.4502034
file name : Image_12102023144449036.png
|
2023-10-12 14:44:49.094001 |
128 |
68192862 |
Construction of roads |
152476 |
Construction of roads1 |
Roof laid |
-
latitude : 23.46690026577562,23.46690026577562
Longitude : 88.46973974257708,88.46973974257708
file name : Image_17112023141243559.png
|
2023-11-17 14:12:43.700324 |
129 |
68192862 |
Construction of roads |
152476 |
Construction of roads1 |
Plinth level |
-
latitude : 23.467029849998653,23.467050595209002
Longitude : 88.46972339786589,88.4697646368295
file name : Image_06112023151421140.png
|
2023-11-06 15:14:21.248739 |
130 |
68192862 |
Construction of roads |
152476 |
Construction of roads1 |
Plinth level |
-
latitude : 23.467029849998653,23.467050595209002
Longitude : 88.46972339786589,88.4697646368295
file name : Image_06112023151415115.png
|
2023-11-06 15:14:15.18418 |
131 |
68192862 |
Construction of roads |
152476 |
Construction of roads1 |
Completion of work |
-
latitude : 23.466929770074785,23.466638582758605
Longitude : 88.47048740833998,88.46840048208833
file name : Image_12102023153420000.png
|
2023-10-12 15:34:20.05925 |
132 |
35095526 |
Improvement of C.C road from the H/O- Asit Roy to the H/O-Shibcharan Roy at Dalimoula. |
106844 |
Improvement of C.C road from the H/O- Asit Roy to the H/O-Shibcharan Roy at Dalimoula.1 |
Roof laid |
-
latitude : 23.472867216914892,23.472866588272154,23.472868390381336
Longitude : 88.47844258882105,88.47840009257197,88.47839900292456
file name : Image_24032022120819688.png
|
2022-03-24 12:08:19.781887 |
133 |
35095526 |
Improvement of C.C road from the H/O- Asit Roy to the H/O-Shibcharan Roy at Dalimoula. |
106844 |
Improvement of C.C road from the H/O- Asit Roy to the H/O-Shibcharan Roy at Dalimoula.1 |
Plinth level |
-
latitude : 23.47291629295796,23.47291629295796
Longitude : 88.47837829962373,88.47837829962373
file name : Image_24032022120437739.png
|
2022-03-24 12:04:37.823164 |
134 |
35095526 |
Improvement of C.C road from the H/O- Asit Roy to the H/O-Shibcharan Roy at Dalimoula. |
106844 |
Improvement of C.C road from the H/O- Asit Roy to the H/O-Shibcharan Roy at Dalimoula.1 |
Completion of work |
-
latitude : 23.47292186692357,23.472854518331587
Longitude : 88.47834309563041,88.47824955359101
file name : Image_21032022101621017.png
|
2022-03-21 10:16:21.109489 |
135 |
57829900 |
Construction of Cement Concrete road from H/O Majnu Sk to H/O Tahajuddin Sk at Hatpara |
106000 |
Construction of Cement Concrete road from H/O Majnu Sk to H/O Tahajuddin Sk at Hatpara1 |
Plinth level |
-
latitude : 23.4820741,23.4818532
Longitude : 88.4499378,88.4500804
file name : Image_22022023142632337.png
|
2023-02-22 14:26:32.396709 |
136 |
57829900 |
Construction of Cement Concrete road from H/O Majnu Sk to H/O Tahajuddin Sk at Hatpara |
106000 |
Construction of Cement Concrete road from H/O Majnu Sk to H/O Tahajuddin Sk at Hatpara1 |
Roof laid |
-
latitude : 23.4818903,23.4818366
Longitude : 88.4499736,88.4500097
file name : Image_22022023150019759.png
|
2023-02-22 15:00:19.809945 |
137 |
57829900 |
Construction of Cement Concrete road from H/O Majnu Sk to H/O Tahajuddin Sk at Hatpara |
106000 |
Construction of Cement Concrete road from H/O Majnu Sk to H/O Tahajuddin Sk at Hatpara1 |
Plinth level |
-
latitude : 23.4818819,23.4818819
Longitude : 88.4500194,88.4500194
file name : Image_20022023130534027.png
|
2023-02-20 13:05:34.089579 |
138 |
57829900 |
Construction of Cement Concrete road from H/O Majnu Sk to H/O Tahajuddin Sk at Hatpara |
106000 |
Construction of Cement Concrete road from H/O Majnu Sk to H/O Tahajuddin Sk at Hatpara1 |
Completion of work |
-
latitude : 23.4819368,23.4819368
Longitude : 88.4499496,88.4499496
file name : Image_18022023172103610.png
|
2023-02-18 17:21:03.672039 |
139 |
39072032 |
Construction of cover pucca drain from the H/O-Jinnath Sk to the Hansadanga Pry School at Hansadanga |
350000 |
Construction of cover pucca drain from the H/O-Jinnath Sk to the Hansadanga Pry School at Hansadanga1 |
Roof laid |
-
latitude : 23.46499040722847,23.46499363426119
Longitude : 88.46119883470237,88.46119531430304
file name : Image_07042022161340925.png
|
2022-04-07 16:13:41.028255 |
140 |
39072032 |
Construction of cover pucca drain from the H/O-Jinnath Sk to the Hansadanga Pry School at Hansadanga |
350000 |
Construction of cover pucca drain from the H/O-Jinnath Sk to the Hansadanga Pry School at Hansadanga1 |
Plinth level |
-
latitude : 23.46400720998645,23.46400720998645
Longitude : 88.4537355042994,88.4537355042994
file name : Image_01042022131458553.png
|
2022-04-01 13:14:58.645455 |
141 |
39072032 |
Construction of cover pucca drain from the H/O-Jinnath Sk to the Hansadanga Pry School at Hansadanga |
350000 |
Construction of cover pucca drain from the H/O-Jinnath Sk to the Hansadanga Pry School at Hansadanga1 |
Completion of work |
-
latitude : 23.465191,23.4651941
Longitude : 88.4624321,88.4624209
file name : Image_08032022105154049.png
|
2022-03-08 10:51:54.236549 |
142 |
63834122 |
Construction of Paver Block road from NH-34 to Loknath Mandir at Dhubulia Netajipalli |
180000 |
Construction of Paver Block road from NH-34 to Loknath Mandir at Dhubulia Netajipalli1 |
Roof laid |
-
latitude : 23.4930375,23.4930375
Longitude : 88.45084,88.45084
file name : Image_22022023150632552.png
|
2023-02-22 15:06:32.617922 |
143 |
63834122 |
Construction of Paver Block road from NH-34 to Loknath Mandir at Dhubulia Netajipalli |
180000 |
Construction of Paver Block road from NH-34 to Loknath Mandir at Dhubulia Netajipalli1 |
Completion of work |
-
latitude : 23.492662673816085,23.492662673816085
Longitude : 88.45047594979405,88.45047594979405
file name : Image_09022023121946490.png
|
2023-02-09 12:19:46.545316 |
144 |
39067004 |
Construction of Pay and use community Toilet at Gram Panchayat Cattel Hat Market at Battala |
350000 |
Construction of Pay and use community Toilet at Gram Panchayat Cattel Hat Market at Battala1 |
Roof laid |
-
latitude : 23.480869
Longitude : 88.4503149
file name : Image_13052022145615568.png
|
2022-05-13 14:56:15.731164 |
145 |
39067004 |
Construction of Pay and use community Toilet at Gram Panchayat Cattel Hat Market at Battala |
350000 |
Construction of Pay and use community Toilet at Gram Panchayat Cattel Hat Market at Battala1 |
Plinth level |
-
latitude : 23.4811478
Longitude : 88.4502791
file name : Image_21032022112844234.png
|
2022-03-21 11:28:44.332675 |
146 |
39067004 |
Construction of Pay and use community Toilet at Gram Panchayat Cattel Hat Market at Battala |
350000 |
Construction of Pay and use community Toilet at Gram Panchayat Cattel Hat Market at Battala1 |
Completion of work |
-
latitude : 23.4810927
Longitude : 88.4503048
file name : Image_09032022115540463.png
|
2022-03-09 11:55:40.593828 |
147 |
35030220 |
Improvement of Balck Top road from Dhubulia Natunpara N.H-34 to the H/O- Prokash Biswas at Dhubulia. |
350000 |
Improvement of Balck Top road from Dhubulia Natunpara N.H-34 to the H/O- Prokash Biswas at Dhubulia.1 |
Roof laid |
-
latitude : 23.4779358,23.4778009
Longitude : 88.449083,88.449052
file name : Image_07042022111532217.png
|
2022-04-07 11:15:32.307571 |
148 |
35030220 |
Improvement of Balck Top road from Dhubulia Natunpara N.H-34 to the H/O- Prokash Biswas at Dhubulia. |
350000 |
Improvement of Balck Top road from Dhubulia Natunpara N.H-34 to the H/O- Prokash Biswas at Dhubulia.1 |
Plinth level |
-
latitude : 23.4779305,23.4779305
Longitude : 88.4491557,88.4491557
file name : Image_06042022100042619.png
|
2022-04-06 10:00:42.719339 |
149 |
35030220 |
Improvement of Balck Top road from Dhubulia Natunpara N.H-34 to the H/O- Prokash Biswas at Dhubulia. |
350000 |
Improvement of Balck Top road from Dhubulia Natunpara N.H-34 to the H/O- Prokash Biswas at Dhubulia.1 |
Completion of work |
-
latitude : 23.4777489,23.4777489
Longitude : 88.4490205,88.4490205
file name : Image_24032022131906710.png
|
2022-03-24 13:19:06.810013 |
150 |
48515422 |
Construction of C.C road from the H/O-Shyamal Mondal to the H/O-Paresh Kabiraj at Srikrishnapur. |
85695 |
Construction of C.C road from the H/O-Shyamal Mondal to the H/O-Paresh Kabiraj at Srikrishnapur.1 |
Roof laid |
-
latitude : 23.46421550028026,23.46421935595572
Longitude : 88.48534852266312,88.4853529650718
file name : Image_28032022142022270.png
|
2022-03-28 14:20:22.361486 |
151 |
48515422 |
Construction of C.C road from the H/O-Shyamal Mondal to the H/O-Paresh Kabiraj at Srikrishnapur. |
85695 |
Construction of C.C road from the H/O-Shyamal Mondal to the H/O-Paresh Kabiraj at Srikrishnapur.1 |
Plinth level |
-
latitude : 23.48083656281233,23.464107709005475
Longitude : 88.44896972179413,88.48522287793458
file name : Image_28032022141416170.png
|
2022-03-28 14:14:16.26824 |
152 |
48515422 |
Construction of C.C road from the H/O-Shyamal Mondal to the H/O-Paresh Kabiraj at Srikrishnapur. |
85695 |
Construction of C.C road from the H/O-Shyamal Mondal to the H/O-Paresh Kabiraj at Srikrishnapur.1 |
Completion of work |
-
latitude : 23.464313987642527,23.464177530258894
Longitude : 88.48538624122739,88.48525137640536
file name : Image_26032022141239504.png
|
2022-03-26 14:12:39.615748 |
153 |
64708926 |
Creation of a new source of drinking water |
242000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.485166234895587
Longitude : 88.44994797371328
file name : Image_23022023122756006.png
|
2023-02-23 12:27:56.068111 |
154 |
64708926 |
Creation of a new source of drinking water |
242000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.4857525
Longitude : 88.4498258
file name : Image_17022023140426897.png
|
2023-02-17 14:04:26.965466 |
155 |
64708926 |
Creation of a new source of drinking water |
242000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.484225
Longitude : 88.4509458
file name : Image_04012023163733238.png
|
2023-01-04 16:37:33.335197 |
156 |
64709073 |
Operation & maintenance of community sanitary complex |
350000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 23.4892597
Longitude : 88.4488623
file name : Image_09022023121338739.png
|
2023-02-09 12:13:38.793393 |
157 |
64273147 |
High Mast (Mini ) Tower light in front of Dhubulia Board Prathamik Vidyalaya |
170000 |
High Mast (Mini ) Tower light in front of Dhubulia Board Prathamik Vidyalaya1 |
Roof laid |
-
latitude : 23.48206237424165
Longitude : 88.44652983359993
file name : Image_15032023155951074.png
|
2023-03-15 15:59:51.137166 |
158 |
64273147 |
High Mast (Mini ) Tower light in front of Dhubulia Board Prathamik Vidyalaya |
170000 |
High Mast (Mini ) Tower light in front of Dhubulia Board Prathamik Vidyalaya1 |
Roof laid |
-
latitude : 23.48203090019524
Longitude : 88.44655690714717
file name : Image_15032023155444464.png
|
2023-03-15 15:54:44.562945 |
159 |
57894241 |
Construction of Community Toilet in front of Dhubulia Youth Socity at Kanthalbagan |
320000 |
Construction of Community Toilet in front of Dhubulia Youth Socity at Kanthalbagan1 |
Plinth level |
-
latitude : 23.4865052
Longitude : 88.4488389
file name : Image_23022023164805504.png
|
2023-02-23 16:48:05.562441 |
160 |
57894241 |
Construction of Community Toilet in front of Dhubulia Youth Socity at Kanthalbagan |
320000 |
Construction of Community Toilet in front of Dhubulia Youth Socity at Kanthalbagan1 |
Completion of work |
-
latitude : 23.4865247
Longitude : 88.4488005
file name : Image_18022023172619801.png
|
2023-02-18 17:26:19.86261 |
161 |
66731194 |
Construction of CC road from the house of Banshi Ghosh to Madan Ghosh at Dolimoulla |
131000 |
Construction of CC road from the house of Banshi Ghosh to Madan Ghosh at Dolimoulla1 |
Roof laid |
-
latitude : 23.47036802675575,23.470375738106668,23.470369284041226
Longitude : 88.47555326297879,88.47555426880717,88.47555334679782
file name : Image_02032023155354180.png
|
2023-03-02 15:53:54.241308 |
162 |
66731194 |
Construction of CC road from the house of Banshi Ghosh to Madan Ghosh at Dolimoulla |
131000 |
Construction of CC road from the house of Banshi Ghosh to Madan Ghosh at Dolimoulla1 |
Plinth level |
-
latitude : 23.47039463929832,23.470394555479288
Longitude : 88.47548453137279,88.47548302263021
file name : Image_28022023125559170.png
|
2023-02-28 12:55:59.225896 |
163 |
66731194 |
Construction of CC road from the house of Banshi Ghosh to Madan Ghosh at Dolimoulla |
131000 |
Construction of CC road from the house of Banshi Ghosh to Madan Ghosh at Dolimoulla1 |
Completion of work |
-
latitude : 23.47043621353805,23.47047485411167
Longitude : 88.475585533306,88.47553490661085
file name : Image_28022023124800637.png
|
2023-02-28 12:48:00.699799 |
164 |
39072075 |
Construction of cover pucca drain from Dhubulia Cusmos Club to the old Graveyard at Dhubulia Battala |
350000 |
Construction of cover pucca drain from Dhubulia Cusmos Club to the old Graveyard at Dhubulia Battala1 |
Plinth level |
-
latitude : 23.4806423,23.4806423
Longitude : 88.4484211,88.4484211
file name : Image_17032022160524815.png
|
2022-03-17 16:05:24.888016 |
165 |
39072075 |
Construction of cover pucca drain from Dhubulia Cusmos Club to the old Graveyard at Dhubulia Battala |
350000 |
Construction of cover pucca drain from Dhubulia Cusmos Club to the old Graveyard at Dhubulia Battala1 |
Completion of work |
-
latitude : 23.4806744,23.4806658
Longitude : 88.4483635,88.4483509
file name : Image_01032022113434135.png
|
2022-03-01 11:34:34.225683 |
166 |
48517257 |
Construction of C.C road from the Srikrishnapur Main Road to the H/O-Naryan Mallick at Srikrishnapur |
74594 |
Construction of C.C road from the Srikrishnapur Main Road to the H/O-Naryan Mallick at Srikrishnapur1 |
Plinth level |
-
latitude : 23.466919460333884,23.466918328776956
Longitude : 88.48445073701441,88.48444998264313
file name : Image_08042022114452858.png
|
2022-04-08 11:44:52.95713 |
167 |
48517257 |
Construction of C.C road from the Srikrishnapur Main Road to the H/O-Naryan Mallick at Srikrishnapur |
74594 |
Construction of C.C road from the Srikrishnapur Main Road to the H/O-Naryan Mallick at Srikrishnapur1 |
Roof laid |
-
latitude : 23.466944857500494,23.46694125328213
Longitude : 88.48444285802543,88.48444193601608
file name : Image_08042022114902034.png
|
2022-04-08 11:49:02.136357 |
168 |
48517257 |
Construction of C.C road from the Srikrishnapur Main Road to the H/O-Naryan Mallick at Srikrishnapur |
74594 |
Construction of C.C road from the Srikrishnapur Main Road to the H/O-Naryan Mallick at Srikrishnapur1 |
Plinth level |
-
latitude : 23.466930608265102,23.466935302130878
Longitude : 88.48445375449955,88.48444931209087
file name : Image_08042022112038892.png
|
2022-04-08 11:20:39.005726 |
169 |
48517257 |
Construction of C.C road from the Srikrishnapur Main Road to the H/O-Naryan Mallick at Srikrishnapur |
74594 |
Construction of C.C road from the Srikrishnapur Main Road to the H/O-Naryan Mallick at Srikrishnapur1 |
Completion of work |
-
latitude : 23.46671167295426,23.46671167295426
Longitude : 88.48447839729488,88.48447839729488
file name : Image_29032022121610622.png
|
2022-03-29 12:16:10.732843 |
170 |
66244219 |
Creation of a new source of drinking water |
250000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.47775172907859,23.47775172907859
Longitude : 88.44481280073524,88.44481280073524
file name : Image_23022023163705236.png
|
2023-02-23 16:37:05.315278 |
171 |
66244219 |
Creation of a new source of drinking water |
250000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.47784036770463,23.477840241976082
Longitude : 88.44473593868315,88.44473627395928
file name : Image_08022023144635459.png
|
2023-02-08 14:46:35.537022 |
172 |
66244219 |
Creation of a new source of drinking water |
250000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.47773833333333,23.477726666666666
Longitude : 88.44485166666666,88.44483999999999
file name : Image_04022023112622287.png
|
2023-02-04 11:26:22.381093 |
173 |
66232818 |
Construction of Cement Concrete road from NH-34 towards H/O- Najir Mondal at Dhubulia Baganepara |
116000 |
Construction of Cement Concrete road from NH-34 towards H/O- Najir Mondal at Dhubulia Baganepara1 |
Plinth level |
-
latitude : 23.47886,23.478866666666665
Longitude : 88.44880833333333,88.44883499999999
file name : Image_05022023154516275.png
|
2023-02-05 15:45:16.374652 |
174 |
66232818 |
Construction of Cement Concrete road from NH-34 towards H/O- Najir Mondal at Dhubulia Baganepara |
116000 |
Construction of Cement Concrete road from NH-34 towards H/O- Najir Mondal at Dhubulia Baganepara1 |
Roof laid |
-
latitude : 23.4787226,23.4787226
Longitude : 88.4489751,88.4489751
file name : Image_06022023152641320.png
|
2023-02-06 15:26:41.378459 |
175 |
66232818 |
Construction of Cement Concrete road from NH-34 towards H/O- Najir Mondal at Dhubulia Baganepara |
116000 |
Construction of Cement Concrete road from NH-34 towards H/O- Najir Mondal at Dhubulia Baganepara1 |
Plinth level |
-
latitude : 23.47888833333333,23.479123333333337
Longitude : 88.44896166666668,88.44882833333334
file name : Image_05022023114317907.png
|
2023-02-05 11:43:18.033727 |
176 |
66232818 |
Construction of Cement Concrete road from NH-34 towards H/O- Najir Mondal at Dhubulia Baganepara |
116000 |
Construction of Cement Concrete road from NH-34 towards H/O- Najir Mondal at Dhubulia Baganepara1 |
Completion of work |
-
latitude : 23.478876666666665,23.4787074
Longitude : 88.44906999999999,88.4490179
file name : Image_04022023110701455.png
|
2023-02-04 11:07:01.551589 |
177 |
48522068 |
Constructton of C.C road from the H/O-Sarkat Sekh to the H/O-Sufiya Bibi at Belgaon Hatatpara. |
171563 |
Constructton of C.C road from the H/O-Sarkat Sekh to the H/O-Sufiya Bibi at Belgaon Hatatpara.1 |
Roof laid |
-
latitude : 23.47580494824797,23.4757920820266
Longitude : 88.46691654995084,88.4669272787869
file name : Image_27052022125731049.png
|
2022-05-27 12:57:31.150132 |
178 |
48522068 |
Constructton of C.C road from the H/O-Sarkat Sekh to the H/O-Sufiya Bibi at Belgaon Hatatpara. |
171563 |
Constructton of C.C road from the H/O-Sarkat Sekh to the H/O-Sufiya Bibi at Belgaon Hatatpara.1 |
Plinth level |
-
latitude : 23.475805325433612,23.475805325433612
Longitude : 88.46694136038423,88.46694136038423
file name : Image_27052022125311079.png
|
2022-05-27 12:53:11.159134 |
179 |
48522068 |
Constructton of C.C road from the H/O-Sarkat Sekh to the H/O-Sufiya Bibi at Belgaon Hatatpara. |
171563 |
Constructton of C.C road from the H/O-Sarkat Sekh to the H/O-Sufiya Bibi at Belgaon Hatatpara.1 |
Completion of work |
-
latitude : 23.47582192160189,23.47582192160189,23.475817353464663
Longitude : 88.46698653884232,88.46698653884232,88.46697472035885
file name : Image_26032022152022447.png
|
2022-03-26 15:20:22.551738 |
180 |
48510164 |
Construction of Cross drain in front of Dhubulia-1 G.P own pond at Hansadanga |
349937 |
Construction of Cross drain in front of Dhubulia-1 G.P own pond at Hansadanga1 |
Roof laid |
-
latitude : 23.464938774704933,23.464938774704933
Longitude : 88.46120704896748,88.46120704896748
file name : Image_17052022124847161.png
|
2022-05-17 12:48:47.28528 |
181 |
48510164 |
Construction of Cross drain in front of Dhubulia-1 G.P own pond at Hansadanga |
349937 |
Construction of Cross drain in front of Dhubulia-1 G.P own pond at Hansadanga1 |
Plinth level |
-
latitude : 23.465086799114943,23.465086799114943,23.46504078246653
Longitude : 88.4603598061949,88.4603598061949,88.4604581259191
file name : Image_07042022112626957.png
|
2022-04-07 11:26:27.119502 |
182 |
48510164 |
Construction of Cross drain in front of Dhubulia-1 G.P own pond at Hansadanga |
349937 |
Construction of Cross drain in front of Dhubulia-1 G.P own pond at Hansadanga1 |
Completion of work |
-
latitude : 23.4651733,23.4651825
Longitude : 88.4624444,88.4624222
file name : Image_26032022143815915.png
|
2022-03-26 14:38:16.021571 |
183 |
48510435 |
Construction of Cover pucca drain from Dhubulia Youth socity to the N.H-34 at culvert at Kanthalbaga |
349754 |
Construction of Cover pucca drain from Dhubulia Youth socity to the N.H-34 at culvert at Kanthalbaga1 |
Roof laid |
-
latitude : 23.4848752,23.4849374
Longitude : 88.4490533,88.4490301
file name : Image_13052022144523747.png
|
2022-05-13 14:45:23.871411 |
184 |
48510435 |
Construction of Cover pucca drain from Dhubulia Youth socity to the N.H-34 at culvert at Kanthalbaga |
349754 |
Construction of Cover pucca drain from Dhubulia Youth socity to the N.H-34 at culvert at Kanthalbaga1 |
Plinth level |
-
latitude : 23.484257217496634,23.484257217496634
Longitude : 88.44841249287128,88.44841249287128
file name : Image_08042022131644611.png
|
2022-04-08 13:16:44.716345 |
185 |
48510435 |
Construction of Cover pucca drain from Dhubulia Youth socity to the N.H-34 at culvert at Kanthalbaga |
349754 |
Construction of Cover pucca drain from Dhubulia Youth socity to the N.H-34 at culvert at Kanthalbaga1 |
Completion of work |
-
latitude : 23.483339650556445,23.483339650556445
Longitude : 88.44948646612465,88.44948646612465
file name : Image_26032022153505096.png
|
2022-03-26 15:35:05.21711 |
186 |
48480917 |
Construction of C.C road from the H/O-Pijush Saha to the H/O-Pintu Banerjee at Deshbandhunagar. |
135000 |
Construction of C.C road from the H/O-Pijush Saha to the H/O-Pintu Banerjee at Deshbandhunagar.1 |
Plinth level |
-
latitude : 23.486978333333333,23.486981666666665,23.48695
Longitude : 88.44701166666667,88.44700499999999,88.44702666666666
file name : Image_14012023113319316.png
|
2023-01-14 11:33:19.439768 |
187 |
48480917 |
Construction of C.C road from the H/O-Pijush Saha to the H/O-Pintu Banerjee at Deshbandhunagar. |
135000 |
Construction of C.C road from the H/O-Pijush Saha to the H/O-Pintu Banerjee at Deshbandhunagar.1 |
Completion of work |
-
latitude : 23.4869344,23.4869344
Longitude : 88.4470533,88.4470533
file name : Image_04012023164004343.png
|
2023-01-04 16:40:04.438615 |
188 |
68189895 |
Construction of roads |
180027 |
Construction of roads1 |
Roof laid |
-
latitude : 23.4919787,23.4919787
Longitude : 88.4498857,88.4498857
file name : Image_13032024131952749.png
|
2024-03-13 13:19:52.816285 |
189 |
68189895 |
Construction of roads |
180027 |
Construction of roads1 |
Plinth level |
-
latitude : 23.4933385,23.4933385
Longitude : 88.4495863,88.4495863
file name : Image_13032024131642404.png
|
2024-03-13 13:16:42.468485 |
190 |
68189895 |
Construction of roads |
180027 |
Construction of roads1 |
Completion of work |
-
latitude : 23.492021,23.492021
Longitude : 88.4497853,88.4497853
file name : Image_05032024154005575.png
|
2024-03-05 15:40:05.635179 |
191 |
68248655 |
Construction of roads |
94745 |
Construction of roads1 |
Roof laid |
-
latitude : 23.4807598,23.48252585157752
Longitude : 88.4492416,88.44974907115102
file name : Image_16032024134245750.png
|
2024-03-16 13:42:45.817419 |
192 |
68248655 |
Construction of roads |
94745 |
Construction of roads1 |
Plinth level |
-
latitude : 23.478583632968366,23.478583632968366
Longitude : 88.44804268330336,88.44804268330336
file name : Image_15032024140447774.png
|
2024-03-15 14:04:47.83311 |
193 |
68248655 |
Construction of roads |
94745 |
Construction of roads1 |
Completion of work |
-
latitude : 23.4847454,23.4847454
Longitude : 88.4486086,88.4486086
file name : Image_05032024145932473.png
|
2024-03-05 14:59:32.530992 |
194 |
68248557 |
Construction of roads |
62234 |
Construction of roads1 |
Roof laid |
-
latitude : 23.4791011,23.4791011
Longitude : 88.4477513,88.4477513
file name : Image_15032024122115724.png
|
2024-03-15 12:21:16.365395 |
195 |
68248557 |
Construction of roads |
62234 |
Construction of roads1 |
Plinth level |
-
latitude : 23.272562194615602,23.272562194615602
Longitude : 88.4373635519296,88.4373635519296
file name : Image_15032024103700110.png
|
2024-03-15 10:37:00.23552 |
196 |
68248557 |
Construction of roads |
62234 |
Construction of roads1 |
Completion of work |
-
latitude : 23.4847454,23.4847454
Longitude : 88.4486086,88.4486086
file name : Image_05032024150032289.png
|
2024-03-05 15:00:32.359789 |
197 |
68189534 |
Construction of roads |
192529 |
Construction of roads1 |
Roof laid |
-
latitude : 23.492101882584393,23.492101882584393
Longitude : 88.44991494901478,88.44991494901478
file name : Image_12032024163752355.png
|
2024-03-12 16:37:52.418232 |
198 |
68189534 |
Construction of roads |
192529 |
Construction of roads1 |
Plinth level |
-
latitude : 23.482861085794866,23.482861085794866
Longitude : 88.44937498681247,88.44937498681247
file name : Image_12032024113646291.png
|
2024-03-12 11:36:46.346445 |
199 |
68189534 |
Construction of roads |
192529 |
Construction of roads1 |
Completion of work |
-
latitude : 23.4847454,23.4847454,23.4847454
Longitude : 88.4486086,88.4486086,88.4486086
file name : Image_05032024145139289.png
|
2024-03-05 14:51:39.352046 |
200 |
68189365 |
Construction of roads |
128027 |
Construction of roads1 |
Roof laid |
-
latitude : 23.4916131,23.4916131
Longitude : 88.4526406,88.4526406
file name : Image_17112023125631682.png
|
2023-11-17 12:56:31.743828 |
201 |
68189365 |
Construction of roads |
128027 |
Construction of roads1 |
Plinth level |
-
latitude : 23.4912363,23.4912363
Longitude : 88.4529932,88.4529932
file name : Image_17112023124748509.png
|
2023-11-17 12:47:48.566527 |
202 |
68189365 |
Construction of roads |
128027 |
Construction of roads1 |
Completion of work |
-
latitude : 23.4911605,23.4911605
Longitude : 88.4529745,88.4529745
file name : Image_17112023124356672.png
|
2023-11-17 12:43:56.730732 |
203 |
48480586 |
Construction of C.C road from the H/O-Unish Mallick to the H/O-Sahabuddin Saha at Arobindapalli. |
100856 |
Construction of C.C road from the H/O-Unish Mallick to the H/O-Sahabuddin Saha at Arobindapalli.1 |
Plinth level |
-
latitude : 23.4842922,23.4842922
Longitude : 88.4492692,88.4492692
file name : Image_30032022123137355.png
|
2022-03-30 12:31:37.453529 |
204 |
48480586 |
Construction of C.C road from the H/O-Unish Mallick to the H/O-Sahabuddin Saha at Arobindapalli. |
100856 |
Construction of C.C road from the H/O-Unish Mallick to the H/O-Sahabuddin Saha at Arobindapalli.1 |
Completion of work |
-
latitude : 23.4837324,23.4837324
Longitude : 88.4492058,88.4492058
file name : Image_26032022153304258.png
|
2022-03-26 15:33:04.373669 |
205 |
61185827 |
Construction of CC Road from the house of Tarak Ghosh towards Hansadanga Puber Para |
335337 |
Construction of CC Road from the house of Tarak Ghosh towards Hansadanga Puber Para1 |
Roof laid |
-
latitude : 23.464935212396085,23.46493282355368
Longitude : 88.46171482466161,88.46171574667096
file name : Image_17052022130342771.png
|
2022-05-17 13:03:42.858952 |
206 |
61185827 |
Construction of CC Road from the house of Tarak Ghosh towards Hansadanga Puber Para |
335337 |
Construction of CC Road from the house of Tarak Ghosh towards Hansadanga Puber Para1 |
Plinth level |
-
latitude : 23.465006416663527,23.46500536892563
Longitude : 88.46165011636913,88.46163989044726
file name : Image_17052022130048455.png
|
2022-05-17 13:00:48.552234 |
207 |
61185827 |
Construction of CC Road from the house of Tarak Ghosh towards Hansadanga Puber Para |
335337 |
Construction of CC Road from the house of Tarak Ghosh towards Hansadanga Puber Para1 |
Completion of work |
-
latitude : 23.4649832,23.4649832
Longitude : 88.4624585,88.4624585
file name : Image_17052022125713657.png
|
2022-05-17 12:57:13.778652 |
208 |
48485753 |
Construction of C.C road from the H/O-Boby Mallick to the H/O-Abul Sekh at Dhubulia Battala |
118485 |
Construction of C.C road from the H/O-Boby Mallick to the H/O-Abul Sekh at Dhubulia Battala1 |
Roof laid |
-
latitude : 23.479138053953648,23.479138053953648,23.479151506908238
Longitude : 88.44608064740896,88.44608064740896,88.4460891969502
file name : Image_18052022143317953.png
|
2022-05-18 14:33:18.026746 |
209 |
48485753 |
Construction of C.C road from the H/O-Boby Mallick to the H/O-Abul Sekh at Dhubulia Battala |
118485 |
Construction of C.C road from the H/O-Boby Mallick to the H/O-Abul Sekh at Dhubulia Battala1 |
Plinth level |
-
latitude : 23.479140400886536,23.479140400886536
Longitude : 88.44615004956722,88.44614996574819
file name : Image_14052022105027320.png
|
2022-05-14 10:50:27.441444 |
210 |
48485753 |
Construction of C.C road from the H/O-Boby Mallick to the H/O-Abul Sekh at Dhubulia Battala |
118485 |
Construction of C.C road from the H/O-Boby Mallick to the H/O-Abul Sekh at Dhubulia Battala1 |
Completion of work |
-
latitude : 23.479194999999997,23.479205
Longitude : 88.446075,88.44605500000002
file name : Image_09042022141200739.png
|
2022-04-09 14:12:00.829091 |
211 |
48514155 |
Construction of C.C road from the Banagram Primary School to the H/O-Subal Mondal at Banagram. |
63205 |
Construction of C.C road from the Banagram Primary School to the H/O-Subal Mondal at Banagram.1 |
Roof laid |
-
latitude : 23.45583766233176,23.45583766233176
Longitude : 88.4657353721559,88.4657353721559
file name : Image_27052022110958816.png
|
2022-05-27 11:09:58.880708 |
212 |
48514155 |
Construction of C.C road from the Banagram Primary School to the H/O-Subal Mondal at Banagram. |
63205 |
Construction of C.C road from the Banagram Primary School to the H/O-Subal Mondal at Banagram.1 |
Plinth level |
-
latitude : 23.455854426138103,23.455854426138103
Longitude : 88.46568642184138,88.46568642184138
file name : Image_08042022135104167.png
|
2022-04-08 13:51:04.280212 |
213 |
48514155 |
Construction of C.C road from the Banagram Primary School to the H/O-Subal Mondal at Banagram. |
63205 |
Construction of C.C road from the Banagram Primary School to the H/O-Subal Mondal at Banagram.1 |
Completion of work |
-
latitude : 23.487325287424028,23.487325287424028
Longitude : 88.46288535743952,88.46288535743952
file name : Image_05042022150629001.png
|
2022-04-05 15:06:29.08846 |
214 |
48511121 |
Construction of cover pucca drain from the H/O-Nasir Sekh to the H/O-Ujit Sekh at Belgaon Hatatpara |
348519 |
Construction of cover pucca drain from the H/O-Nasir Sekh to the H/O-Ujit Sekh at Belgaon Hatatpara1 |
Roof laid |
-
latitude : 23.47532860469073,23.47532860469073
Longitude : 88.46830476075411,88.46830476075411
file name : Image_27052022125050782.png
|
2022-05-27 12:50:50.864505 |
215 |
48511121 |
Construction of cover pucca drain from the H/O-Nasir Sekh to the H/O-Ujit Sekh at Belgaon Hatatpara |
348519 |
Construction of cover pucca drain from the H/O-Nasir Sekh to the H/O-Ujit Sekh at Belgaon Hatatpara1 |
Plinth level |
-
latitude : 23.475331664085388,23.475331664085388
Longitude : 88.46822697669268,88.46822697669268
file name : Image_27052022124714356.png
|
2022-05-27 12:47:14.436394 |
216 |
48511121 |
Construction of cover pucca drain from the H/O-Nasir Sekh to the H/O-Ujit Sekh at Belgaon Hatatpara |
348519 |
Construction of cover pucca drain from the H/O-Nasir Sekh to the H/O-Ujit Sekh at Belgaon Hatatpara1 |
Completion of work |
-
latitude : 23.4751629,23.4751629
Longitude : 88.4689232,88.4689232
file name : Image_12052022125309750.png
|
2022-05-12 12:53:09.858351 |
217 |
39067012 |
Construction of Pay and use community Toilet at Dhubulia Fish Market at Bazar Colony |
350000 |
Construction of Pay and use community Toilet at Dhubulia Fish Market at Bazar Colony1 |
Roof laid |
-
latitude : 23.4922372
Longitude : 88.4491335
file name : Image_02062022145957943.png
|
2022-06-02 14:59:58.044604 |
218 |
39067012 |
Construction of Pay and use community Toilet at Dhubulia Fish Market at Bazar Colony |
350000 |
Construction of Pay and use community Toilet at Dhubulia Fish Market at Bazar Colony1 |
Plinth level |
-
latitude : 23.4933297
Longitude : 88.4495243
file name : Image_21032022122338548.png
|
2022-03-21 12:23:38.643711 |
219 |
39067012 |
Construction of Pay and use community Toilet at Dhubulia Fish Market at Bazar Colony |
350000 |
Construction of Pay and use community Toilet at Dhubulia Fish Market at Bazar Colony1 |
Completion of work |
-
latitude : 23.4928781
Longitude : 88.4491634
file name : Image_15032022165245616.png
|
2022-03-15 16:52:45.738655 |
220 |
39074624 |
Construction of cover pucca drain from the Graveyard to the Petrol pump Dhubulia Battala |
350000 |
Construction of cover pucca drain from the Graveyard to the Petrol pump Dhubulia Battala1 |
Roof laid |
-
latitude : 23.4823316,23.4823316
Longitude : 88.4426308,88.4426308
file name : Image_07062022144518723.png
|
2022-06-07 14:45:18.804737 |
221 |
39074624 |
Construction of cover pucca drain from the Graveyard to the Petrol pump Dhubulia Battala |
350000 |
Construction of cover pucca drain from the Graveyard to the Petrol pump Dhubulia Battala1 |
Plinth level |
-
latitude : 23.4816116373986,23.481616750359535
Longitude : 88.44394569285214,88.44394225627184
file name : Image_24032022114156984.png
|
2022-03-24 11:41:57.083252 |
222 |
39074624 |
Construction of cover pucca drain from the Graveyard to the Petrol pump Dhubulia Battala |
350000 |
Construction of cover pucca drain from the Graveyard to the Petrol pump Dhubulia Battala1 |
Completion of work |
-
latitude : 23.481546468101442,23.481545210815966
Longitude : 88.44392683357,88.44392775557935
file name : Image_24032022113747148.png
|
2022-03-24 11:37:47.246038 |
223 |
48486906 |
Construction of C.C road H/O-Sagar Ghosh to the H/O-Somnath Ghosh at Hasadanga Ghoshpara. |
100000 |
Construction of C.C road H/O-Sagar Ghosh to the H/O-Somnath Ghosh at Hasadanga Ghoshpara.1 |
Roof laid |
-
latitude : 23.46462981775403,23.46462981775403
Longitude : 88.46466433256865,88.46466433256865
file name : Image_29122022143428666.png
|
2022-12-29 14:34:28.746655 |
224 |
48486906 |
Construction of C.C road H/O-Sagar Ghosh to the H/O-Somnath Ghosh at Hasadanga Ghoshpara. |
100000 |
Construction of C.C road H/O-Sagar Ghosh to the H/O-Somnath Ghosh at Hasadanga Ghoshpara.1 |
Plinth level |
-
latitude : 23.464612886309624,23.464612886309624
Longitude : 88.46472610719502,88.46472610719502
file name : Image_28122022155811018.png
|
2022-12-28 15:58:11.096251 |
225 |
48486906 |
Construction of C.C road H/O-Sagar Ghosh to the H/O-Somnath Ghosh at Hasadanga Ghoshpara. |
100000 |
Construction of C.C road H/O-Sagar Ghosh to the H/O-Somnath Ghosh at Hasadanga Ghoshpara.1 |
Completion of work |
-
latitude : 23.46428783610463,23.46428603399545
Longitude : 88.46451060846448,88.464514631778
file name : Image_12122022130748864.png
|
2022-12-12 13:07:48.934084 |
226 |
48520632 |
Construction of C.C road from the H/O-Madan GHosh to the H/O-Bachhan Ghosh at Hsadanga Santrapara. |
100000 |
Construction of C.C road from the H/O-Madan GHosh to the H/O-Bachhan Ghosh at Hsadanga Santrapara.1 |
Roof laid |
-
latitude : 23.464768454432487,23.464768454432487
Longitude : 88.46366202458739,88.46366202458739
file name : Image_29122022142936174.png
|
2022-12-29 14:29:36.257559 |
227 |
48520632 |
Construction of C.C road from the H/O-Madan GHosh to the H/O-Bachhan Ghosh at Hsadanga Santrapara. |
100000 |
Construction of C.C road from the H/O-Madan GHosh to the H/O-Bachhan Ghosh at Hsadanga Santrapara.1 |
Plinth level |
-
latitude : 23.46497666090727,23.46497666090727
Longitude : 88.46369320526719,88.46369320526719
file name : Image_28122022093008540.png
|
2022-12-28 09:30:08.613241 |
228 |
48520632 |
Construction of C.C road from the H/O-Madan GHosh to the H/O-Bachhan Ghosh at Hsadanga Santrapara. |
100000 |
Construction of C.C road from the H/O-Madan GHosh to the H/O-Bachhan Ghosh at Hsadanga Santrapara.1 |
Completion of work |
-
latitude : 23.46494589932263,23.46494589932263
Longitude : 88.46365137957036,88.46365137957036
file name : Image_12122022130414291.png
|
2022-12-12 13:04:14.347278 |
229 |
63833955 |
Construction of Cement Concrete road from H/O- Kamal Sk to H/O- Mustak Mondal at Dhubulia Uttarpara |
60000 |
Construction of Cement Concrete road from H/O- Kamal Sk to H/O- Mustak Mondal at Dhubulia Uttarpara1 |
Plinth level |
-
latitude : 23.480628333333335,23.4833541
Longitude : 88.44916833333333,88.4477324
file name : Image_04012023100846668.png
|
2023-01-04 10:08:46.742135 |
230 |
63833955 |
Construction of Cement Concrete road from H/O- Kamal Sk to H/O- Mustak Mondal at Dhubulia Uttarpara |
60000 |
Construction of Cement Concrete road from H/O- Kamal Sk to H/O- Mustak Mondal at Dhubulia Uttarpara1 |
Plinth level |
-
latitude : 23.4833537,23.483076666666662
Longitude : 88.4477348,88.44761833333332
file name : Image_03012023094159679.png
|
2023-01-03 09:41:59.811254 |
231 |
63833955 |
Construction of Cement Concrete road from H/O- Kamal Sk to H/O- Mustak Mondal at Dhubulia Uttarpara |
60000 |
Construction of Cement Concrete road from H/O- Kamal Sk to H/O- Mustak Mondal at Dhubulia Uttarpara1 |
Completion of work |
-
latitude : 23.4833596,23.4833596
Longitude : 88.447726,88.447726
file name : Image_12122022134144897.png
|
2022-12-12 13:41:44.967919 |
232 |
64273246 |
Construction of CC road from the House of Sidhartha Ghosh towards Hansadanga Puberpara |
97097 |
Construction of CC road from the House of Sidhartha Ghosh towards Hansadanga Puberpara1 |
Plinth level |
-
latitude : 23.464170657098293,23.464170657098293
Longitude : 88.46863961778581,88.46863961778581
file name : Image_20012023124757369.png
|
2023-01-20 12:47:57.452615 |
233 |
64273246 |
Construction of CC road from the House of Sidhartha Ghosh towards Hansadanga Puberpara |
97097 |
Construction of CC road from the House of Sidhartha Ghosh towards Hansadanga Puberpara1 |
Completion of work |
-
latitude : 23.46412820275873,23.46412820275873
Longitude : 88.4686435572803,88.4686435572803
file name : Image_12122022131253938.png
|
2022-12-12 13:12:54.001631 |
234 |
64631001 |
Construction of C C road from Dhubulia Subhas Chandra Balika Vidyalaya towards NH-34 at Deshbandhuna |
100000 |
Construction of C C road from Dhubulia Subhas Chandra Balika Vidyalaya towards NH-34 at Deshbandhuna |
Roof laid |
-
latitude : 23.4873716,23.4873716
Longitude : 88.4489993,88.4489993
file name : Image_06022023153010428.png
|
2023-02-06 15:30:10.493696 |
235 |
64631001 |
Construction of C C road from Dhubulia Subhas Chandra Balika Vidyalaya towards NH-34 at Deshbandhuna |
100000 |
Construction of C C road from Dhubulia Subhas Chandra Balika Vidyalaya towards NH-34 at Deshbandhuna |
Plinth level |
-
latitude : 23.4874934,23.4874801
Longitude : 88.4493714,88.4493821
file name : Image_05022023113042350.png
|
2023-02-05 11:30:42.466639 |
236 |
64631001 |
Construction of C C road from Dhubulia Subhas Chandra Balika Vidyalaya towards NH-34 at Deshbandhuna |
100000 |
Construction of C C road from Dhubulia Subhas Chandra Balika Vidyalaya towards NH-34 at Deshbandhuna |
Completion of work |
-
latitude : 23.48736333333333,23.48736333333333
Longitude : 88.44894000000001,88.44894000000001
file name : Image_04022023104522335.png
|
2023-02-04 10:45:22.440529 |
237 |
34912637 |
Improvement of C.C road from H/O-Kiyamuddin Mallick to the Mission Gate at Dhubulia Uttarpara. |
220041 |
Improvement of C.C road from H/O-Kiyamuddin Mallick to the Mission Gate at Dhubulia Uttarpara.1 |
Roof laid |
-
latitude : 23.48415166666667,23.484103333333337,23.484131666666666
Longitude : 88.44624666666665,88.446215,88.44619666666668
file name : Image_29062021115215969.png
|
2021-06-29 11:52:16.051472 |
238 |
34912637 |
Improvement of C.C road from H/O-Kiyamuddin Mallick to the Mission Gate at Dhubulia Uttarpara. |
220041 |
Improvement of C.C road from H/O-Kiyamuddin Mallick to the Mission Gate at Dhubulia Uttarpara.1 |
Plinth level |
-
latitude : 23.484159999999996,23.484176666666666
Longitude : 88.44623333333332,88.44617666666666
file name : Image_26032021115501407.png
|
2021-03-26 11:55:01.504493 |
239 |
34912637 |
Improvement of C.C road from H/O-Kiyamuddin Mallick to the Mission Gate at Dhubulia Uttarpara. |
220041 |
Improvement of C.C road from H/O-Kiyamuddin Mallick to the Mission Gate at Dhubulia Uttarpara.1 |
Completion of work |
-
latitude : 23.4835343,23.4832361
Longitude : 88.445924,88.4459033
file name : Image_02032021123204761.png
|
2021-03-02 12:32:04.873677 |
240 |
39067050 |
Construction of Pay and use community Toilet in front of Dhubulia Police Station at Kanthalbagan |
350000 |
Construction of Pay and use community Toilet in front of Dhubulia Police Station at Kanthalbagan1 |
Roof laid |
-
latitude : 23.4807978
Longitude : 88.4493036
file name : Image_29072021145553072.png
|
2021-07-29 14:55:53.173182 |
241 |
39067050 |
Construction of Pay and use community Toilet in front of Dhubulia Police Station at Kanthalbagan |
350000 |
Construction of Pay and use community Toilet in front of Dhubulia Police Station at Kanthalbagan1 |
Plinth level |
-
latitude : 23.486568333333334
Longitude : 88.44789666666665
file name : Image_30032021131532470.png
|
2021-03-30 13:15:32.538901 |
242 |
39067050 |
Construction of Pay and use community Toilet in front of Dhubulia Police Station at Kanthalbagan |
350000 |
Construction of Pay and use community Toilet in front of Dhubulia Police Station at Kanthalbagan1 |
Completion of work |
-
latitude : 23.486584997735918
Longitude : 88.44785710796714
file name : Image_02032021151726568.png
|
2021-03-02 15:17:26.669865 |
243 |
39066924 |
Construction of Pay and use community Toilet beside Gram Panchayat owned Market complex at Battala |
350000 |
Construction of Pay and use community Toilet beside Gram Panchayat owned Market complex at Battala1 |
Roof laid |
-
latitude : 23.4804513
Longitude : 88.4488471
file name : Image_15072021093605501.png
|
2021-07-15 09:36:05.593297 |
244 |
39066924 |
Construction of Pay and use community Toilet beside Gram Panchayat owned Market complex at Battala |
350000 |
Construction of Pay and use community Toilet beside Gram Panchayat owned Market complex at Battala1 |
Plinth level |
-
latitude : 23.4805199
Longitude : 88.4488669
file name : Image_22032021144548525.png
|
2021-03-22 14:45:48.671602 |
245 |
39066924 |
Construction of Pay and use community Toilet beside Gram Panchayat owned Market complex at Battala |
350000 |
Construction of Pay and use community Toilet beside Gram Panchayat owned Market complex at Battala1 |
Completion of work |
-
latitude : 23.4812039
Longitude : 88.4487007
file name : Image_01032021165759082.png
|
2021-03-01 16:57:59.193514 |
246 |
35038696 |
Improvement of C.C road from the H/O-Kasem Mallick to the H/O- Jamir Mallick at Dhubulia. |
74279 |
Improvement of C.C road from the H/O-Kasem Mallick to the H/O- Jamir Mallick at Dhubulia.1 |
Completion of work |
-
latitude : 23.481081666666668,23.481058333333333
Longitude : 88.44593833333332,88.445855
file name : Image_26032021115442519.png
|
2021-03-26 11:54:42.614554 |
247 |
35038696 |
Improvement of C.C road from the H/O-Kasem Mallick to the H/O- Jamir Mallick at Dhubulia. |
74279 |
Improvement of C.C road from the H/O-Kasem Mallick to the H/O- Jamir Mallick at Dhubulia.1 |
Completion of work |
-
latitude : 23.481063333333335,23.481
Longitude : 88.44593333333333,88.446
file name : Image_10032021145535048.png
|
2021-03-10 14:55:35.13574 |
248 |
34933573 |
Repairing of Boundary wall and Gate of Hansadanga Sub-Centre at Hansadanga. |
349745 |
Repairing of Boundary wall and Gate of Hansadanga Sub-Centre at Hansadanga.1 |
Plinth level |
-
latitude : 23.463315283879638
Longitude : 88.47080768086016
file name : Image_02082021155035786.png
|
2021-08-02 15:50:35.894008 |
249 |
34933573 |
Repairing of Boundary wall and Gate of Hansadanga Sub-Centre at Hansadanga. |
349745 |
Repairing of Boundary wall and Gate of Hansadanga Sub-Centre at Hansadanga.1 |
Plinth level |
-
latitude : 23.463333333333335
Longitude : 88.47022833333334
file name : Image_31032021150536386.png
|
2021-03-31 15:05:36.45733 |
250 |
34933573 |
Repairing of Boundary wall and Gate of Hansadanga Sub-Centre at Hansadanga. |
349745 |
Repairing of Boundary wall and Gate of Hansadanga Sub-Centre at Hansadanga.1 |
Completion of work |
-
latitude : 23.463376666666665
Longitude : 88.470345
file name : Image_10032021132220473.png
|
2021-03-10 13:22:20.552885 |
251 |
39071406 |
Construction of Pay and use community Toilet at Vegetable Market at Bazar Colony |
350000 |
Construction of Pay and use community Toilet at Vegetable Market at Bazar Colony1 |
Roof laid |
-
latitude : 23.49563753698021
Longitude : 88.44916543923318
file name : Image_30072021113651972.png
|
2021-07-30 11:36:52.06583 |
252 |
39071406 |
Construction of Pay and use community Toilet at Vegetable Market at Bazar Colony |
350000 |
Construction of Pay and use community Toilet at Vegetable Market at Bazar Colony1 |
Plinth level |
-
latitude : 23.4955055
Longitude : 88.4493471
file name : Image_09032021184358931.png
|
2021-03-09 18:43:59.019076 |
253 |
39071406 |
Construction of Pay and use community Toilet at Vegetable Market at Bazar Colony |
350000 |
Construction of Pay and use community Toilet at Vegetable Market at Bazar Colony1 |
Completion of work |
-
latitude : 23.495613
Longitude : 88.4491523
file name : Image_01032021170242424.png
|
2021-03-01 17:02:42.498381 |
254 |
39074655 |
Construction of cover pucca drain from the H/O-Saraswati Biswas to the H/O-Rasaranjan Ganapati /T |
300891 |
Construction of cover pucca drain from the H/O-Saraswati Biswas to the H/O-Rasaranjan Ganapati /T1 |
Roof laid |
-
latitude : 23.489440670236945,23.489440670236945,23.489440670236945
Longitude : 88.4557316545397,88.4557316545397,88.4557316545397
file name : Image_19082021130118358.png
|
2021-08-19 13:01:18.456263 |
255 |
39074655 |
Construction of cover pucca drain from the H/O-Saraswati Biswas to the H/O-Rasaranjan Ganapati /T |
300891 |
Construction of cover pucca drain from the H/O-Saraswati Biswas to the H/O-Rasaranjan Ganapati /T1 |
Completion of work |
-
latitude : 23.48939833333333,23.48939833333333
Longitude : 88.45577999999999,88.45577999999999
file name : Image_20032021131810684.png
|
2021-03-20 13:18:10.762178 |
256 |
39074655 |
Construction of cover pucca drain from the H/O-Saraswati Biswas to the H/O-Rasaranjan Ganapati /T |
300891 |
Construction of cover pucca drain from the H/O-Saraswati Biswas to the H/O-Rasaranjan Ganapati /T1 |
Completion of work |
-
latitude : 23.489393333333336,23.4894
Longitude : 88.45579500000001,88.45578500000002
file name : Image_10032021134035941.png
|
2021-03-10 13:40:36.03207 |
257 |
68092036 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.482009484432638
Longitude : 88.4472893178463
file name : Image_30122023145745621.png
|
2023-12-30 14:57:45.687087 |
258 |
68092036 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.4819906251505
Longitude : 88.44733751378953
file name : Image_19122023143942707.png
|
2023-12-19 14:39:42.799365 |
259 |
68092036 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.4821535
Longitude : 88.4474625
file name : Image_15122023134059407.png
|
2023-12-15 13:40:59.48204 |
260 |
68092036 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.4819687
Longitude : 88.4474988
file name : Image_06112023141711424.png
|
2023-11-06 14:17:11.485179 |
261 |
52414385 |
Improvement of Cement Concrete road from the HO Shambhu Das to the HO Sushil Dutta at Bazar Colony |
190181 |
Improvement of Cement Concrete road from the HO Shambhu Das to the HO Sushil Dutta at Bazar Colony1 |
Roof laid |
-
latitude : 23.493486447259784,23.4936678
Longitude : 88.45312597230077,88.4534376
file name : Image_21092021141657382.png
|
2021-09-21 14:16:57.538528 |
262 |
52414385 |
Improvement of Cement Concrete road from the HO Shambhu Das to the HO Sushil Dutta at Bazar Colony |
190181 |
Improvement of Cement Concrete road from the HO Shambhu Das to the HO Sushil Dutta at Bazar Colony1 |
Plinth level |
-
latitude : 23.4935387,23.4935387
Longitude : 88.4531494,88.4531494
file name : Image_21092021123622586.png
|
2021-09-21 12:36:22.688939 |
263 |
52414385 |
Improvement of Cement Concrete road from the HO Shambhu Das to the HO Sushil Dutta at Bazar Colony |
190181 |
Improvement of Cement Concrete road from the HO Shambhu Das to the HO Sushil Dutta at Bazar Colony1 |
Completion of work |
-
latitude : 23.4935979,23.4936969
Longitude : 88.453364,88.453484
file name : Image_11092021123810978.png
|
2021-09-11 12:38:11.09524 |
264 |
52414533 |
Construction of Culvert in front of HO Amaresh Pal at Belgaon under Dhubulia1 GP |
151335 |
Construction of Culvert in front of HO Amaresh Pal at Belgaon under Dhubulia1 GP1 |
Plinth level |
-
latitude : 23.486253200098872,23.486253200098872
Longitude : 88.46130721271038,88.46130721271038
file name : Image_21092021140521737.png
|
2021-09-21 14:05:21.816893 |
265 |
52414533 |
Construction of Culvert in front of HO Amaresh Pal at Belgaon under Dhubulia1 GP |
151335 |
Construction of Culvert in front of HO Amaresh Pal at Belgaon under Dhubulia1 GP1 |
Completion of work |
-
latitude : 23.48596700001508,23.486265731044114
Longitude : 88.46104930154979,88.46130369231105
file name : Image_18092021112454048.png
|
2021-09-18 11:24:54.192959 |
266 |
52414533 |
Construction of Culvert in front of HO Amaresh Pal at Belgaon under Dhubulia1 GP |
151335 |
Construction of Culvert in front of HO Amaresh Pal at Belgaon under Dhubulia1 GP1 |
Completion of work |
-
latitude : 23.48623936995864,23.4862615
Longitude : 88.46126731485128,88.4622745
file name : Image_11092021120042318.png
|
2021-09-11 12:00:42.422754 |
267 |
52414798 |
Repair of Cover Pucca Drain from Shani Mandir to Kanthalbagan Culvert under Dhubulia1 GP |
98163 |
Repair of Cover Pucca Drain from Shani Mandir to Kanthalbagan Culvert under Dhubulia1 GP1 |
Roof laid |
-
latitude : 23.483453770168126,23.4833746
Longitude : 88.44830528832972,88.449143
file name : Image_21092021134706058.png
|
2021-09-21 13:47:06.166678 |
268 |
52414798 |
Repair of Cover Pucca Drain from Shani Mandir to Kanthalbagan Culvert under Dhubulia1 GP |
98163 |
Repair of Cover Pucca Drain from Shani Mandir to Kanthalbagan Culvert under Dhubulia1 GP1 |
Plinth level |
-
latitude : 23.4833786,23.4833767
Longitude : 88.4491411,88.4491425
file name : Image_21092021133838662.png
|
2021-09-21 13:38:38.769832 |
269 |
52414798 |
Repair of Cover Pucca Drain from Shani Mandir to Kanthalbagan Culvert under Dhubulia1 GP |
98163 |
Repair of Cover Pucca Drain from Shani Mandir to Kanthalbagan Culvert under Dhubulia1 GP1 |
Completion of work |
-
latitude : 23.48342661280185,23.4833767
Longitude : 88.44838391058147,88.4491425
file name : Image_21092021133449646.png
|
2021-09-21 13:34:49.785645 |
270 |
34940526 |
Construction of Boundary Wall with playing instrument at Dhubulia3/25 Children Park. |
242592 |
Construction of Boundary Wall with playing instrument at Dhubulia3/25 Children Park.1 |
Roof laid |
-
latitude : 23.4866706
Longitude : 88.458635
file name : Image_21092021155511852.png
|
2021-09-21 15:55:11.972388 |
271 |
34940526 |
Construction of Boundary Wall with playing instrument at Dhubulia3/25 Children Park. |
242592 |
Construction of Boundary Wall with playing instrument at Dhubulia3/25 Children Park.1 |
Plinth level |
-
latitude : 23.486436721868813
Longitude : 88.45832132734358
file name : Image_02082021154800953.png
|
2021-08-02 15:48:01.064456 |
272 |
34940526 |
Construction of Boundary Wall with playing instrument at Dhubulia3/25 Children Park. |
242592 |
Construction of Boundary Wall with playing instrument at Dhubulia3/25 Children Park.1 |
Completion of work |
-
latitude : 23.4865337
Longitude : 88.458317
file name : Image_03032021155628954.png
|
2021-03-03 15:56:29.062179 |
273 |
35064716 |
Improvement of C.C road from the H/O- Nurmahammad Mallick to the H/O- Ismile Sekh at Dhubulia. |
185841 |
Improvement of C.C road from the H/O- Nurmahammad Mallick to the H/O- Ismile Sekh at Dhubulia.1 |
Roof laid |
-
latitude : 23.4810598,23.4810257
Longitude : 88.450555,88.4505829
file name : Image_27122021162828892.png
|
2021-12-27 16:28:29.005562 |
274 |
35064716 |
Improvement of C.C road from the H/O- Nurmahammad Mallick to the H/O- Ismile Sekh at Dhubulia. |
185841 |
Improvement of C.C road from the H/O- Nurmahammad Mallick to the H/O- Ismile Sekh at Dhubulia.1 |
Plinth level |
-
latitude : 23.4809699,23.4810601
Longitude : 88.4505754,88.4504346
file name : Image_10122021132602655.png
|
2021-12-10 13:26:02.757269 |
275 |
35064716 |
Improvement of C.C road from the H/O- Nurmahammad Mallick to the H/O- Ismile Sekh at Dhubulia. |
185841 |
Improvement of C.C road from the H/O- Nurmahammad Mallick to the H/O- Ismile Sekh at Dhubulia.1 |
Completion of work |
-
latitude : 23.48147,23.48147
Longitude : 88.4505089,88.4505089
file name : Image_31032021145340222.png
|
2021-03-31 14:53:40.314236 |
276 |
34926898 |
Improvement of C.Croad from the H/O- Sukumar Pal to N.H-34 at Dhubulia Hospitalpara. |
141000 |
Improvement of C.Croad from the H/O- Sukumar Pal to N.H-34 at Dhubulia Hospitalpara.1 |
Plinth level |
-
latitude : 23.4897602,23.4897848
Longitude : 88.4474215,88.4474249
file name : Image_17032022130311436.png
|
2022-03-17 13:03:11.530628 |
277 |
34926898 |
Improvement of C.Croad from the H/O- Sukumar Pal to N.H-34 at Dhubulia Hospitalpara. |
141000 |
Improvement of C.Croad from the H/O- Sukumar Pal to N.H-34 at Dhubulia Hospitalpara.1 |
Plinth level |
-
latitude : 23.4898843,23.4898844
Longitude : 88.4475213,88.4475202
file name : Image_09032022121427374.png
|
2022-03-09 12:14:27.480793 |
278 |
34926898 |
Improvement of C.Croad from the H/O- Sukumar Pal to N.H-34 at Dhubulia Hospitalpara. |
141000 |
Improvement of C.Croad from the H/O- Sukumar Pal to N.H-34 at Dhubulia Hospitalpara.1 |
Completion of work |
-
latitude : 23.4900283254683,23.490002467297018
Longitude : 88.44710583798587,88.44714439474046
file name : Image_18022022115337619.png
|
2022-02-18 11:53:37.756466 |
279 |
35065260 |
Improvement of C.C road from the H/O- Majnu Sekh to the H/O- Farjan Sekh at Dhubulia Battala. |
77556 |
Improvement of C.C road from the H/O- Majnu Sekh to the H/O- Farjan Sekh at Dhubulia Battala.1 |
Roof laid |
-
latitude : 23.4819653,23.4819653
Longitude : 88.4501931,88.4501931
file name : Image_24032022133344299.png
|
2022-03-24 13:33:44.407169 |
280 |
35065260 |
Improvement of C.C road from the H/O- Majnu Sekh to the H/O- Farjan Sekh at Dhubulia Battala. |
77556 |
Improvement of C.C road from the H/O- Majnu Sekh to the H/O- Farjan Sekh at Dhubulia Battala.1 |
Plinth level |
-
latitude : 23.4817737,23.4817737
Longitude : 88.4501836,88.4501836
file name : Image_22032022135207925.png
|
2022-03-22 13:52:08.018162 |
281 |
35065260 |
Improvement of C.C road from the H/O- Majnu Sekh to the H/O- Farjan Sekh at Dhubulia Battala. |
77556 |
Improvement of C.C road from the H/O- Majnu Sekh to the H/O- Farjan Sekh at Dhubulia Battala.1 |
Completion of work |
-
latitude : 23.48187,23.4819184
Longitude : 88.4501369,88.4501968
file name : Image_01032022154441087.png
|
2022-03-01 15:44:41.194624 |
282 |
39071961 |
Construction of waiting room with shed of Gram panchayat solid waste management project |
350000 |
Construction of waiting room with shed of Gram panchayat solid waste management project1 |
Plinth level |
-
latitude : 23.47834562882781
Longitude : 88.4573968872428
file name : Image_22032022161946407.png
|
2022-03-22 16:19:46.504048 |
283 |
39071961 |
Construction of waiting room with shed of Gram panchayat solid waste management project |
350000 |
Construction of waiting room with shed of Gram panchayat solid waste management project1 |
Completion of work |
-
latitude : 23.478424292989075
Longitude : 88.45732329413295
file name : Image_01032022153832655.png
|
2022-03-01 15:38:32.759712 |
284 |
68249687 |
Electricity connection /Installation of Solar Energy |
170326 |
Electricity connection /Installation of Solar Energy1 |
Roof laid |
-
latitude : 23.45592688769102
Longitude : 88.46617860719562
file name : Image_01042024142148747.png
|
2024-04-01 14:21:48.822852 |
285 |
68249687 |
Electricity connection /Installation of Solar Energy |
170326 |
Electricity connection /Installation of Solar Energy1 |
Plinth level |
-
latitude : 23.455901574343443
Longitude : 88.46611767075956
file name : Image_01042024140536460.png
|
2024-04-01 14:05:36.526415 |
286 |
68249687 |
Electricity connection /Installation of Solar Energy |
170326 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 23.455883972346783
Longitude : 88.46608573570848
file name : Image_06032024134423692.png
|
2024-03-06 13:44:23.821857 |
287 |
68249687 |
Electricity connection /Installation of Solar Energy |
170326 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 23.455860670655966
Longitude : 88.46612060442567
file name : Image_06032024134318828.png
|
2024-03-06 13:43:18.893055 |
288 |
68248841 |
Construction of roads |
79210 |
Construction of roads1 |
Roof laid |
-
latitude : 23.4812599,23.4812599,23.4820038
Longitude : 88.4465966,88.4465966,88.4465966
file name : Image_14032024131552078.png
|
2024-03-14 13:15:52.132813 |
289 |
68248841 |
Construction of roads |
79210 |
Construction of roads1 |
Plinth level |
-
latitude : 23.4821642,23.4821642
Longitude : 88.4474856,88.4474856
file name : Image_13032024121551987.png
|
2024-03-13 12:15:52.100097 |
290 |
68248841 |
Construction of roads |
79210 |
Construction of roads1 |
Completion of work |
-
latitude : 23.4847454,23.4847454
Longitude : 88.4486086,88.4486086
file name : Image_05032024145528001.png
|
2024-03-05 14:55:28.059588 |
291 |
68191767 |
Construction of roads |
77928 |
Construction of roads1 |
Roof laid |
-
latitude : 23.49190968554467,23.49190968554467
Longitude : 88.44989642500877,88.44989642500877
file name : Image_13032024162350273.png
|
2024-03-13 16:23:50.330414 |
292 |
68191767 |
Construction of roads |
77928 |
Construction of roads1 |
Roof laid |
-
latitude : 23.4919796,23.4919796
Longitude : 88.44985,88.44985
file name : Image_12032024151308272.png
|
2024-03-12 15:13:08.33941 |
293 |
68191767 |
Construction of roads |
77928 |
Construction of roads1 |
Plinth level |
-
latitude : 23.4933364,23.4933364
Longitude : 88.4494695,88.4494695
file name : Image_12032024115343971.png
|
2024-03-12 11:53:44.033615 |
294 |
68191767 |
Construction of roads |
77928 |
Construction of roads1 |
Plinth level |
-
latitude : 23.493371,23.493371,23.4922377
Longitude : 88.4495227,88.4495227,88.4491638
file name : Image_12032024115340740.png
|
2024-03-12 11:53:40.797864 |
295 |
68191767 |
Construction of roads |
77928 |
Construction of roads1 |
Completion of work |
-
latitude : 23.479791171848774,23.479791171848774
Longitude : 88.45088004134595,88.45088004134595
file name : Image_05032024144109764.png
|
2024-03-05 14:41:09.821207 |
296 |
68190313 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.4862505,23.4862505
Longitude : 88.4541539,88.4541539
file name : Image_14032024165610725.png
|
2024-03-14 16:56:10.801765 |
297 |
68190313 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.4862722,23.4862722
Longitude : 88.4542419,88.4542419
file name : Image_14032024132849688.png
|
2024-03-14 13:28:49.764049 |
298 |
68190313 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.4864521,23.4864521
Longitude : 88.4527959,88.4527959
file name : Image_05032024144625379.png
|
2024-03-05 14:46:25.438373 |
299 |
68191669 |
Construction of roads |
145536 |
Construction of roads1 |
Roof laid |
-
latitude : 23.4845368,23.4845368
Longitude : 88.4420374,88.4420374
file name : Image_18112023124457116.png
|
2023-11-18 12:44:57.257619 |
300 |
68191669 |
Construction of roads |
145536 |
Construction of roads1 |
Roof laid |
-
latitude : 23.4845368,23.4845368,23.4845368
Longitude : 88.4420373,88.4420373,88.4420373
file name : Image_17112023122555807.png
|
2023-11-17 12:25:55.868123 |
301 |
68191669 |
Construction of roads |
145536 |
Construction of roads1 |
Plinth level |
-
latitude : 23.4845366,23.4845366
Longitude : 88.4420372,88.4420372
file name : Image_17112023121520380.png
|
2023-11-17 12:15:20.449439 |
302 |
68191669 |
Construction of roads |
145536 |
Construction of roads1 |
Completion of work |
-
latitude : 23.4845367,23.4845367
Longitude : 88.4420514,88.4420514
file name : Image_12102023150045680.png
|
2023-10-12 15:00:45.751533 |
303 |
73495265 |
Construction of CC road from the house of Nepal Biswas towards house of Gopal Biswas |
50391 |
Construction of CC road from the house of Nepal Biswas towards house of Gopal Biswas1 |
Roof laid |
-
latitude : 23.4825702,23.4825702
Longitude : 88.4457618,88.4457618
file name : Image_22052024134310883.png
|
2024-05-22 13:43:10.933889 |
304 |
73495265 |
Construction of CC road from the house of Nepal Biswas towards house of Gopal Biswas |
50391 |
Construction of CC road from the house of Nepal Biswas towards house of Gopal Biswas1 |
Plinth level |
-
latitude : 23.4823106,23.4823106
Longitude : 88.4457026,88.4457026
file name : Image_16102023154244786.png
|
2023-10-16 15:42:44.853305 |
305 |
73495265 |
Construction of CC road from the house of Nepal Biswas towards house of Gopal Biswas |
50391 |
Construction of CC road from the house of Nepal Biswas towards house of Gopal Biswas1 |
Completion of work |
-
latitude : 23.481595292687416,23.481595292687416
Longitude : 88.44539609737694,88.44539609737694
file name : Image_09062023140925754.png
|
2023-06-09 14:09:25.812254 |
306 |
68249548 |
Electricity/Solar Power Installation |
163849 |
Electricity/Solar Power Installation1 |
Roof laid |
-
latitude : 23.484652591869235
Longitude : 88.45460512675345
file name : Image_17112023132507317.png
|
2023-11-17 13:25:07.367147 |
307 |
68249548 |
Electricity/Solar Power Installation |
163849 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 23.484687083400786
Longitude : 88.45456757582724
file name : Image_17112023131043532.png
|
2023-11-17 13:10:43.631153 |
308 |
68249548 |
Electricity/Solar Power Installation |
163849 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 23.484656824730337
Longitude : 88.45460998825729
file name : Image_17112023130748532.png
|
2023-11-17 13:07:48.592242 |
309 |
68189700 |
Construction of roads |
177739 |
Construction of roads1 |
Roof laid |
-
latitude : 23.4807364,23.401455748826265
Longitude : 88.4492935,88.49082291126251
file name : Image_24062024123905692.png
|
2024-06-24 12:39:05.77861 |
310 |
68189700 |
Construction of roads |
177739 |
Construction of roads1 |
Plinth level |
-
latitude : 23.48500827793032,23.48500827793032
Longitude : 88.4473672695458,88.4473672695458
file name : Image_22062024115152347.png
|
2024-06-22 11:51:52.445065 |
311 |
68189700 |
Construction of roads |
177739 |
Construction of roads1 |
Completion of work |
-
latitude : 23.484881417825818,23.48488070536405
Longitude : 88.44758997671306,88.44758503139019
file name : Image_07062024162328130.png
|
2024-06-07 16:23:28.230297 |
312 |
68249252 |
Electricity/Solar Power Installation |
190450 |
Electricity/Solar Power Installation1 |
Roof laid |
-
latitude : 23.4876632
Longitude : 88.4599381
file name : Image_09072024141408267.png
|
2024-07-09 14:14:08.350795 |
313 |
68249252 |
Electricity/Solar Power Installation |
190450 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 23.487721
Longitude : 88.4598661
file name : Image_04072024142141698.png
|
2024-07-04 14:21:41.784468 |
314 |
68249252 |
Electricity/Solar Power Installation |
190450 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 23.487508012913167
Longitude : 88.45948431640863
file name : Image_18062024160647051.png
|
2024-06-18 16:06:47.143287 |
315 |
68100177 |
Construction of Community Sanitary Complex |
315508 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.462268845178187
Longitude : 88.45279606059194
file name : Image_24082024123828249.png
|
2024-08-24 12:38:28.331796 |
316 |
68100177 |
Construction of Community Sanitary Complex |
315508 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.49463724065572
Longitude : 88.45148948952556
file name : Image_30072024164208364.png
|
2024-07-30 16:42:08.452071 |
317 |
68100177 |
Construction of Community Sanitary Complex |
315508 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.462293236516416
Longitude : 88.45277669839561
file name : Image_10062024152130494.png
|
2024-06-10 15:21:30.58399 |
318 |
68087333 |
Creation of a new source of drinking water |
242621 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.4858105
Longitude : 88.4496173
file name : Image_04072024145220446.png
|
2024-07-04 14:52:20.548744 |
319 |
68087333 |
Creation of a new source of drinking water |
242621 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.48579
Longitude : 88.4496201
file name : Image_04072024141407857.png
|
2024-07-04 14:14:07.966019 |
320 |
68087333 |
Creation of a new source of drinking water |
242621 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.48580703139305
Longitude : 88.44946576282382
file name : Image_11062024121452399.png
|
2024-06-11 12:14:52.518287 |
321 |
68087707 |
Creation of a new source of drinking water |
244382 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.479641
Longitude : 88.4526114
file name : Image_04072024113735570.png
|
2024-07-04 11:37:35.670658 |
322 |
68087707 |
Creation of a new source of drinking water |
244382 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.4796368
Longitude : 88.4526114
file name : Image_04072024112846574.png
|
2024-07-04 11:28:46.677045 |
323 |
68087707 |
Creation of a new source of drinking water |
244382 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.479465367272496
Longitude : 88.45213229767978
file name : Image_13062024140647283.png
|
2024-06-13 14:06:47.395509 |
324 |
68091500 |
Creation of a new source of drinking water |
244382 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.480586
Longitude : 88.4473996
file name : Image_08072024125436084.png
|
2024-07-08 12:54:36.184173 |
325 |
68091500 |
Creation of a new source of drinking water |
244382 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.4806869
Longitude : 88.447483
file name : Image_04072024161312695.png
|
2024-07-04 16:13:12.779582 |
326 |
68091500 |
Creation of a new source of drinking water |
244382 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.48065
Longitude : 88.4474591
file name : Image_04072024160956957.png
|
2024-07-04 16:09:57.055267 |
327 |
68091500 |
Creation of a new source of drinking water |
244382 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.4805507
Longitude : 88.447342
file name : Image_05072024152127556.png
|
2024-07-05 15:21:27.659407 |
328 |
68091500 |
Creation of a new source of drinking water |
244382 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.480585860088468
Longitude : 88.44748025760055
file name : Image_13062024140742797.png
|
2024-06-13 14:07:42.895298 |
329 |
68102735 |
Creation of drainage channel for management of grey water |
280000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.48488330375403
Longitude : 88.4549326915294
file name : Image_26072024123641878.png
|
2024-07-26 12:36:41.973423 |
330 |
68102735 |
Creation of drainage channel for management of grey water |
280000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.484823959879577
Longitude : 88.45506931655109
file name : Image_01072024130224386.png
|
2024-07-01 13:02:24.510042 |
331 |
68102735 |
Creation of drainage channel for management of grey water |
280000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.46582964528352
Longitude : 88.45185477286577
file name : Image_29062024114218828.png
|
2024-06-29 11:42:18.924311 |
332 |
70336342 |
Creation of community compost pits for a group of Households |
350000 |
Creation of community compost pits for a group of Households1 |
Plinth level |
-
latitude : 23.489332585595548
Longitude : 88.46167006529868
file name : Image_01072024133248689.png
|
2024-07-01 13:32:48.788879 |
333 |
70336342 |
Creation of community compost pits for a group of Households |
350000 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 23.489389163441956
Longitude : 88.46167358569801
file name : Image_01072024131433148.png
|
2024-07-01 13:14:33.235348 |
334 |
68249397 |
Electricity/Solar Power Installation |
170326 |
Electricity/Solar Power Installation1 |
Roof laid |
-
latitude : 23.481315379031003
Longitude : 88.445057971403
file name : Image_01042024150124209.png
|
2024-04-01 15:01:24.284539 |
335 |
68249397 |
Electricity/Solar Power Installation |
170326 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 23.48277789540589
Longitude : 88.44249897636473
file name : Image_14032024134831415.png
|
2024-03-14 13:48:31.473038 |
336 |
68249397 |
Electricity/Solar Power Installation |
170326 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 23.482859074138105
Longitude : 88.44251917675138
file name : Image_05032024152703786.png
|
2024-03-05 15:27:03.856167 |
337 |
57876285 |
Construction of Ganga Water Tapkal Platform with soak pit in sansad no 3. 5 |
350000 |
Construction of Ganga Water Tapkal Platform with soak pit in sansad no 3. 51 |
Roof laid |
-
latitude : 23.47992800641805
Longitude : 88.45226070843637
file name : Image_11072024143752178.png
|
2024-07-11 14:37:52.271101 |
338 |
57876285 |
Construction of Ganga Water Tapkal Platform with soak pit in sansad no 3. 5 |
350000 |
Construction of Ganga Water Tapkal Platform with soak pit in sansad no 3. 51 |
Roof laid |
-
latitude : 23.4911873
Longitude : 88.4531543
file name : Image_17042023171220495.png
|
2023-04-17 17:12:20.555962 |
339 |
52413631 |
Installation of LED road light from Hansadanga NH34 to Hansadanga Primary School under Dhubulia1 GP |
349977 |
Installation of LED road light from Hansadanga NH34 to Hansadanga Primary School under Dhubulia1 GP1 |
Roof laid |
-
latitude : 23.463861322961748
Longitude : 88.45284610055387
file name : Image_21092021132240094.png
|
2021-09-21 13:22:40.190957 |
340 |
52413631 |
Installation of LED road light from Hansadanga NH34 to Hansadanga Primary School under Dhubulia1 GP |
349977 |
Installation of LED road light from Hansadanga NH34 to Hansadanga Primary School under Dhubulia1 GP1 |
Plinth level |
-
latitude : 23.46390419639647
Longitude : 88.45289521850646
file name : Image_21092021131856640.png
|
2021-09-21 13:18:56.741189 |
341 |
52413631 |
Installation of LED road light from Hansadanga NH34 to Hansadanga Primary School under Dhubulia1 GP |
349977 |
Installation of LED road light from Hansadanga NH34 to Hansadanga Primary School under Dhubulia1 GP1 |
Completion of work |
-
latitude : 23.463874985463917
Longitude : 88.45292313024402
file name : Image_21092021131444968.png
|
2021-09-21 13:14:45.060046 |
342 |
68090005 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.4844064
Longitude : 88.4491099
file name : Image_28122023135108305.png
|
2023-12-28 13:51:08.391424 |
343 |
68090005 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.4873771
Longitude : 88.4477031
file name : Image_15122023140619044.png
|
2023-12-15 14:06:19.098026 |
344 |
68090005 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.4919781
Longitude : 88.4491391
file name : Image_06112023160611374.png
|
2023-11-06 16:06:11.69373 |
345 |
68247960 |
Construction of roads |
144260 |
Construction of roads1 |
Roof laid |
-
latitude : 23.45314317382872,23.453151849098504,23.45315390266478,23.45315390266478
Longitude : 88.4688388556242,88.4688388556242,88.46882862970233,88.46882862970233
file name : Image_15122023133935232.png
|
2023-12-15 13:39:35.298346 |
346 |
68247960 |
Construction of roads |
144260 |
Construction of roads1 |
Plinth level |
-
latitude : 23.453117609024048,23.453111154958606
Longitude : 88.46880189143121,88.46880465745926
file name : Image_17112023142840579.png
|
2023-11-17 14:28:40.639922 |
347 |
68247960 |
Construction of roads |
144260 |
Construction of roads1 |
Completion of work |
-
latitude : 23.453150633722544,23.453150633722544
Longitude : 88.46880591474473,88.46880591474473
file name : Image_12102023154518447.png
|
2023-10-12 15:45:18.508997 |
348 |
68097137 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.45778356306255
Longitude : 88.45407983288169
file name : Image_24062024130625874.png
|
2024-06-24 13:06:25.98676 |
349 |
68097137 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.4577498678118
Longitude : 88.45404135994613
file name : Image_28122023135015996.png
|
2023-12-28 13:50:16.055756 |
350 |
68097137 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.4807828
Longitude : 88.4492563
file name : Image_20122023150915919.png
|
2023-12-20 15:09:15.975232 |
351 |
68097137 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.4808645
Longitude : 88.4492353
file name : Image_16122023140222828.png
|
2023-12-16 14:02:22.887414 |
352 |
68097137 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.45777140930295
Longitude : 88.45393759198487
file name : Image_06112023144319699.png
|
2023-11-06 14:43:19.762514 |
353 |
107548443 |
Purchase of litter bins to be fixed at public places |
107500 |
Purchase of litter bins to be fixed at public places1 |
Roof laid |
-
latitude : 23.4807293
Longitude : 88.449325
file name : Image_24092024122036803.png
|
2024-09-24 12:20:36.879139 |
354 |
107548443 |
Purchase of litter bins to be fixed at public places |
107500 |
Purchase of litter bins to be fixed at public places1 |
Roof laid |
-
latitude : 23.480736
Longitude : 88.4493226
file name : Image_23092024174006629.png
|
2024-09-23 17:40:06.729029 |
355 |
107548443 |
Purchase of litter bins to be fixed at public places |
107500 |
Purchase of litter bins to be fixed at public places1 |
Plinth level |
-
latitude : 23.489145459607244
Longitude : 88.44941966235638
file name : Image_23092024150316943.png
|
2024-09-23 15:03:17.033994 |
356 |
107548443 |
Purchase of litter bins to be fixed at public places |
107500 |
Purchase of litter bins to be fixed at public places1 |
Completion of work |
-
latitude : 23.461867477744818
Longitude : 88.45334733836353
file name : Image_23092024125929115.png
|
2024-09-23 12:59:29.186652 |
357 |
48522590 |
Construction of C.C road from the H/O-Prasanta Mridha to the H/O-Anu Shil at Netajipalli. |
117081 |
Construction of C.C road from the H/O-Prasanta Mridha to the H/O-Anu Shil at Netajipalli.1 |
Plinth level |
-
latitude : 23.4920613,23.4920613
Longitude : 88.4524712,88.4524712
file name : Image_08042022101025916.png
|
2022-04-08 10:10:25.999942 |
358 |
48522590 |
Construction of C.C road from the H/O-Prasanta Mridha to the H/O-Anu Shil at Netajipalli. |
117081 |
Construction of C.C road from the H/O-Prasanta Mridha to the H/O-Anu Shil at Netajipalli.1 |
Completion of work |
-
latitude : 23.4915645,23.4915645
Longitude : 88.4527349,88.4527349
file name : Image_07042022104033089.png
|
2022-04-07 10:40:33.192424 |
359 |
48511948 |
Construction of Dolimoula Sub-Centre at Hansadanga |
350000 |
Construction of Dolimoula Sub-Centre at Hansadanga1 |
Plinth level |
-
latitude : 23.46348350867629
Longitude : 88.47081748768687
file name : Image_09022023132848926.png
|
2023-02-09 13:28:48.993558 |
360 |
64631319 |
Construction of Pucca drain from the H/O- Samser Sekh towards ICDS Centre at Belgaon Hatatpara |
350000 |
Construction of Pucca drain from the H/O- Samser Sekh towards ICDS Centre at Belgaon Hatatpara1 |
Roof laid |
-
latitude : 23.47577666666667,23.475751666666664
Longitude : 88.46625666666665,88.46627500000001
file name : Image_20012023175249749.png
|
2023-01-20 17:52:49.843462 |
361 |
64631319 |
Construction of Pucca drain from the H/O- Samser Sekh towards ICDS Centre at Belgaon Hatatpara |
350000 |
Construction of Pucca drain from the H/O- Samser Sekh towards ICDS Centre at Belgaon Hatatpara1 |
Plinth level |
-
latitude : 23.475859999999997,23.475859999999997
Longitude : 88.46631000000001,88.46631000000001
file name : Image_18012023164240581.png
|
2023-01-18 16:42:40.719596 |
362 |
64631319 |
Construction of Pucca drain from the H/O- Samser Sekh towards ICDS Centre at Belgaon Hatatpara |
350000 |
Construction of Pucca drain from the H/O- Samser Sekh towards ICDS Centre at Belgaon Hatatpara1 |
Completion of work |
-
latitude : 23.48107947036624,23.48107947036624
Longitude : 88.45045901834965,88.45045901834965
file name : Image_13012023115732105.png
|
2023-01-13 11:57:32.184477 |
363 |
64631319 |
Construction of Pucca drain from the H/O- Samser Sekh towards ICDS Centre at Belgaon Hatatpara |
350000 |
Construction of Pucca drain from the H/O- Samser Sekh towards ICDS Centre at Belgaon Hatatpara1 |
Completion of work |
-
latitude : 23.475734288804233,23.475734288804233,23.475731355138123
Longitude : 88.46623476594687,88.46623476594687,88.46622194163501
file name : Image_13012023115735399.png
|
2023-01-13 11:57:35.476669 |
364 |
64631319 |
Construction of Pucca drain from the H/O- Samser Sekh towards ICDS Centre at Belgaon Hatatpara |
350000 |
Construction of Pucca drain from the H/O- Samser Sekh towards ICDS Centre at Belgaon Hatatpara1 |
Completion of work |
-
latitude : 23.475755000000003,23.475813333333335
Longitude : 88.46629499999999,88.46630833333332
file name : Image_04012023161024537.png
|
2023-01-04 16:10:24.635676 |
365 |
57835639 |
Installation of Mini High Mast Tower light at Swasan Ghat at 7 No Group |
150000 |
Installation of Mini High Mast Tower light at Swasan Ghat at 7 No Group1 |
Roof laid |
-
latitude : 23.4788374369964
Longitude : 88.45704685896635
file name : Image_02052023144415866.png
|
2023-05-02 14:44:15.92713 |
366 |
57835639 |
Installation of Mini High Mast Tower light at Swasan Ghat at 7 No Group |
150000 |
Installation of Mini High Mast Tower light at Swasan Ghat at 7 No Group1 |
Completion of work |
-
latitude : 23.478737105615437
Longitude : 88.45788144506514
file name : Image_25042023125937467.png
|
2023-04-25 12:59:37.551327 |
367 |
57890072 |
Construction of Cover Pucca Drain from 3/25 Kali Mandir to H/O Amrita Kundu at 3/25 No Group |
300000 |
Construction of Cover Pucca Drain from 3/25 Kali Mandir to H/O Amrita Kundu at 3/25 No Group1 |
Roof laid |
-
latitude : 23.27024179045111,23.27024179045111
Longitude : 88.43714495189488,88.43714495189488
file name : Image_23032023134020118.png
|
2023-03-23 13:40:20.182906 |
368 |
57890072 |
Construction of Cover Pucca Drain from 3/25 Kali Mandir to H/O Amrita Kundu at 3/25 No Group |
300000 |
Construction of Cover Pucca Drain from 3/25 Kali Mandir to H/O Amrita Kundu at 3/25 No Group1 |
Completion of work |
-
latitude : 23.484585,23.484585
Longitude : 88.45897166666667,88.45897333333332
file name : Image_04032023113544523.png
|
2023-03-04 11:35:44.785002 |
369 |
57890072 |
Construction of Cover Pucca Drain from 3/25 Kali Mandir to H/O Amrita Kundu at 3/25 No Group |
300000 |
Construction of Cover Pucca Drain from 3/25 Kali Mandir to H/O Amrita Kundu at 3/25 No Group1 |
Completion of work |
-
latitude : 23.4847786,23.4847828,23.4847828
Longitude : 88.4591558,88.4591525,88.4591525
file name : Image_23022023165738661.png
|
2023-02-23 16:57:38.720841 |
370 |
57886757 |
Construction of Cover Pucca Drain from H/O Chandi Santra to H/O Kalu Sk at Hansadanga |
350000 |
Construction of Cover Pucca Drain from H/O Chandi Santra to H/O Kalu Sk at Hansadanga1 |
Plinth level |
-
latitude : 23.465903280302882,23.46589640714228
Longitude : 88.4628379996866,88.4628414362669
file name : Image_15032023151117322.png
|
2023-03-15 15:11:17.404511 |
371 |
57886757 |
Construction of Cover Pucca Drain from H/O Chandi Santra to H/O Kalu Sk at Hansadanga |
350000 |
Construction of Cover Pucca Drain from H/O Chandi Santra to H/O Kalu Sk at Hansadanga1 |
Completion of work |
-
latitude : 23.4651329,23.4651329
Longitude : 88.4623383,88.4623383
file name : Image_15032023150743625.png
|
2023-03-15 15:07:43.751824 |
372 |
66731353 |
Costruction of CC road from the house of Sushanta Biswas to Kidzee School Deesbandhu nagar |
160000 |
Costruction of CC road from the house of Sushanta Biswas to Kidzee School Deesbandhu nagar1 |
Completion of work |
-
latitude : 23.4894132,23.4894132
Longitude : 88.446774,88.446774
file name : Image_15032023153307076.png
|
2023-03-15 15:33:07.148291 |
373 |
66731353 |
Costruction of CC road from the house of Sushanta Biswas to Kidzee School Deesbandhu nagar |
160000 |
Costruction of CC road from the house of Sushanta Biswas to Kidzee School Deesbandhu nagar1 |
Plinth level |
-
latitude : 23.4795505,23.4795505
Longitude : 88.4487502,88.4487502
file name : Image_15032023153611639.png
|
2023-03-15 15:36:11.709061 |
374 |
57865837 |
Construction of Water Tank with pump set with soak pit at Battala Graveyard |
250000 |
Construction of Water Tank with pump set with soak pit at Battala Graveyard 1 |
Roof laid |
-
latitude : 23.477687733247876,23.47769204992801
Longitude : 88.44491044990718,88.44491480849683
file name : Image_31052023141749214.png
|
2023-05-31 14:17:49.278963 |
375 |
57865837 |
Construction of Water Tank with pump set with soak pit at Battala Graveyard |
250000 |
Construction of Water Tank with pump set with soak pit at Battala Graveyard 1 |
Plinth level |
-
latitude : 23.4820919,23.4820919
Longitude : 88.4474758,88.4474758
file name : Image_31052023134211655.png
|
2023-05-31 13:42:11.715244 |
376 |
57865837 |
Construction of Water Tank with pump set with soak pit at Battala Graveyard |
250000 |
Construction of Water Tank with pump set with soak pit at Battala Graveyard 1 |
Completion of work |
-
latitude : 23.492152467370033,23.477728720754385
Longitude : 88.45283176749945,88.44489117152989
file name : Image_02052023143119982.png
|
2023-05-02 14:31:20.043408 |
377 |
67352210 |
Construction of CC road from the House Of Abdul Ajad Mandal to House of Kiyam Mallick at Sansad X |
350000 |
Construction of CC road from the House Of Abdul Ajad Mandal to House of Kiyam Mallick at Sansad X1 |
Plinth level |
-
latitude : 23.478836598806083,23.478839281015098
Longitude : 88.44668288715184,88.44668012112379
file name : Image_18042023133634193.png
|
2023-04-18 13:36:34.255287 |
378 |
67352210 |
Construction of CC road from the House Of Abdul Ajad Mandal to House of Kiyam Mallick at Sansad X |
350000 |
Construction of CC road from the House Of Abdul Ajad Mandal to House of Kiyam Mallick at Sansad X1 |
Completion of work |
-
latitude : 23.246232122182846,23.246232122182846
Longitude : 88.43767259269953,88.43767259269953
file name : Image_18042023133227034.png
|
2023-04-18 13:32:27.100282 |
379 |
67351875 |
Creation of drainage channel for management of grey water |
245000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.4804243
Longitude : 88.4492172
file name : Image_25042023133958296.png
|
2023-04-25 13:39:58.366188 |
380 |
67351875 |
Creation of drainage channel for management of grey water |
245000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.4805228
Longitude : 88.4493071
file name : Image_12042023162425739.png
|
2023-04-12 16:24:25.808598 |
381 |
67351564 |
Creation of a new source of drinking water |
250000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.483469150960445
Longitude : 88.44254105351865
file name : Image_25042023140251660.png
|
2023-04-25 14:02:51.729755 |
382 |
67351564 |
Creation of a new source of drinking water |
250000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.483464582823217
Longitude : 88.44258019700646
file name : Image_10042023171020009.png
|
2023-04-10 17:10:20.128127 |
383 |
67352032 |
Construction of CC Road from the house of Shyamal Shing towards House of Shiben Biswas |
100000 |
Construction of CC Road from the house of Shyamal Shing towards House of Shiben Biswas1 |
Completion of work |
-
latitude : 23.4896297,23.4896297
Longitude : 88.4461861,88.4461861
file name : Image_25042023140731729.png
|
2023-04-25 14:07:31.795824 |
384 |
67351700 |
Creation of a new source of drinking water |
250000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.24622449465096
Longitude : 88.43767234124243
file name : Image_15052023151245639.png
|
2023-05-15 15:12:45.705884 |
385 |
67351700 |
Creation of a new source of drinking water |
250000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.390115117654204
Longitude : 88.48453816026449
file name : Image_02052023131722376.png
|
2023-05-02 13:17:22.44946 |
386 |
67351700 |
Creation of a new source of drinking water |
250000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.492228
Longitude : 88.4528576
file name : Image_02052023131832564.png
|
2023-05-02 13:18:32.635532 |
387 |
67351700 |
Creation of a new source of drinking water |
250000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.4922277
Longitude : 88.4527597
file name : Image_25042023142402036.png
|
2023-04-25 14:24:02.103693 |
388 |
73492494 |
Construction of Cement concrete road from the house of Santana Ghosh towards the kalipada Pramanick |
56694 |
Construction of Cement concrete road from the house of Santana Ghosh towards the kalipada Pramanick1 |
Plinth level |
-
latitude : 23.466517296619713,23.466517296619713
Longitude : 88.46505342051387,88.46505342051387
file name : Image_02082023165533915.png
|
2023-08-02 16:55:33.979307 |
389 |
73492494 |
Construction of Cement concrete road from the house of Santana Ghosh towards the kalipada Pramanick |
56694 |
Construction of Cement concrete road from the house of Santana Ghosh towards the kalipada Pramanick1 |
Completion of work |
-
latitude : 23.4664293,23.4664293
Longitude : 88.4651177,88.4651177
file name : Image_09062023131016747.png
|
2023-06-09 13:10:16.81496 |
390 |
73486436 |
Construction of CC road from the house Samiran Bhattacharyya towards the house of Pranab Biswas |
97450 |
Construction of CC road from the house Samiran Bhattacharyya towards the house of Pranab Biswas1 |
Roof laid |
-
latitude : 23.485433,23.485433
Longitude : 88.4481186,88.4481186
file name : Image_13062023122952866.png
|
2023-06-13 12:29:52.937154 |
391 |
73486436 |
Construction of CC road from the house Samiran Bhattacharyya towards the house of Pranab Biswas |
97450 |
Construction of CC road from the house Samiran Bhattacharyya towards the house of Pranab Biswas1 |
Plinth level |
-
latitude : 23.485438,23.485438
Longitude : 88.4480943,88.4480943
file name : Image_13062023122700572.png
|
2023-06-13 12:27:00.626828 |
392 |
73486436 |
Construction of CC road from the house Samiran Bhattacharyya towards the house of Pranab Biswas |
97450 |
Construction of CC road from the house Samiran Bhattacharyya towards the house of Pranab Biswas1 |
Completion of work |
-
latitude : 23.4855276,23.4853895
Longitude : 88.4482187,88.4481319
file name : Image_09062023135554982.png
|
2023-06-09 13:55:55.045443 |
393 |
73497384 |
Creation of drainage channel for management of grey water |
348516 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.4849097
Longitude : 88.449108
file name : Image_06062023143952604.png
|
2023-06-06 14:39:52.664653 |
394 |
73497384 |
Creation of drainage channel for management of grey water |
348516 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.484654
Longitude : 88.4491233
file name : Image_06062023143507966.png
|
2023-06-06 14:35:08.029853 |
395 |
68094981 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.4844064
Longitude : 88.4491099
file name : Image_28122023140539567.png
|
2023-12-28 14:05:39.629876 |
396 |
68094981 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.4873771
Longitude : 88.4477031
file name : Image_15122023141447106.png
|
2023-12-15 14:14:47.158332 |
397 |
68094981 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.4911461
Longitude : 88.4538047
file name : Image_06112023154916844.png
|
2023-11-06 15:49:16.979277 |
398 |
68094981 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.4912296
Longitude : 88.4537351
file name : Image_06112023154249961.png
|
2023-11-06 15:42:50.033756 |
399 |
68088142 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.4870729
Longitude : 88.4478583
file name : Image_29122023125811743.png
|
2023-12-29 12:58:11.795574 |
400 |
68088142 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.480546423234046
Longitude : 88.45029816962779
file name : Image_29122023125720388.png
|
2023-12-29 12:57:20.442374 |
401 |
68088142 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.4868336468935
Longitude : 88.44771310687065
file name : Image_15122023135903251.png
|
2023-12-15 13:59:03.315667 |
402 |
68088142 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.486887458711863
Longitude : 88.44773691147566
file name : Image_06112023161313657.png
|
2023-11-06 16:13:13.838737 |
403 |
66731445 |
Repair of Black Top road from Godwan of Tarak Ghosh to Hasadanga Masjit at Hasadanga |
248948 |
Repair of Black Top road from Godwan of Tarak Ghosh to Hasadanga Masjit at Hasadanga1 |
Roof laid |
-
latitude : 23.465972221456468,23.465972221456468
Longitude : 88.46303874626756,88.46303874626756
file name : Image_11072024150016380.png
|
2024-07-11 15:00:16.463319 |
404 |
66731445 |
Repair of Black Top road from Godwan of Tarak Ghosh to Hasadanga Masjit at Hasadanga |
248948 |
Repair of Black Top road from Godwan of Tarak Ghosh to Hasadanga Masjit at Hasadanga1 |
Plinth level |
-
latitude : 23.46596723422408,23.46596723422408
Longitude : 88.4630208928138,88.4630208928138
file name : Image_11072024145632256.png
|
2024-07-11 14:56:32.350091 |
405 |
66731445 |
Repair of Black Top road from Godwan of Tarak Ghosh to Hasadanga Masjit at Hasadanga |
248948 |
Repair of Black Top road from Godwan of Tarak Ghosh to Hasadanga Masjit at Hasadanga1 |
Completion of work |
-
latitude : 23.46398684196174,23.46398684196174
Longitude : 88.46892192028463,88.46892192028463
file name : Image_09062023150934788.png
|
2023-06-09 15:09:34.853413 |
406 |
73495934 |
Construction of CC road from the house of Sundari Bewa towards the house of Alamin Sk |
53091 |
Construction of CC road from the house of Sundari Bewa towards the house of Alamin Sk1 |
Roof laid |
-
latitude : 23.480650358833373,23.480650358833373
Longitude : 88.45200313255191,88.45200313255191
file name : Image_11072024154519882.png
|
2024-07-11 15:45:19.964301 |
407 |
73495934 |
Construction of CC road from the house of Sundari Bewa towards the house of Alamin Sk |
53091 |
Construction of CC road from the house of Sundari Bewa towards the house of Alamin Sk1 |
Plinth level |
-
latitude : 23.4806775,23.4806775,23.48067638464272
Longitude : 88.4527823,88.4527823,88.45204571262002
file name : Image_11072024153815239.png
|
2024-07-11 15:38:15.324457 |
408 |
73495934 |
Construction of CC road from the house of Sundari Bewa towards the house of Alamin Sk |
53091 |
Construction of CC road from the house of Sundari Bewa towards the house of Alamin Sk1 |
Completion of work |
-
latitude : 23.4852690808475,23.4852690808475
Longitude : 88.44835038296878,88.44835038296878
file name : Image_09062023140234466.png
|
2023-06-09 14:02:34.522505 |
409 |
89037767 |
Electric connection |
190430 |
Electric connection1 |
Roof laid |
-
latitude : 23.481048457324505
Longitude : 88.45792410895228
file name : Image_20092024151643374.png
|
2024-09-20 15:16:43.453529 |
410 |
89037767 |
Electric connection |
190430 |
Electric connection1 |
Plinth level |
-
latitude : 23.4815177
Longitude : 88.4571631
file name : Image_20092024151008870.png
|
2024-09-20 15:10:08.942596 |
411 |
89037767 |
Electric connection |
190430 |
Electric connection1 |
Completion of work |
-
latitude : 23.4813066
Longitude : 88.4577049
file name : Image_10082024151105506.png
|
2024-08-10 15:11:05.617766 |
412 |
89037554 |
Electric connection |
190430 |
Electric connection1 |
Roof laid |
-
latitude : 23.4862377
Longitude : 88.4480113
file name : Image_20092024145502339.png
|
2024-09-20 14:55:02.449015 |
413 |
89037554 |
Electric connection |
190430 |
Electric connection1 |
Plinth level |
-
latitude : 23.4862451
Longitude : 88.4480116
file name : Image_12092024165413928.png
|
2024-09-12 16:54:14.011345 |
414 |
89037554 |
Electric connection |
190430 |
Electric connection1 |
Completion of work |
-
latitude : 23.4862336
Longitude : 88.4480004
file name : Image_10082024152103068.png
|
2024-08-10 15:21:03.166534 |
415 |
89059302 |
Electric connection |
190430 |
Electric connection1 |
Roof laid |
-
latitude : 23.465862963348627
Longitude : 88.46363838762045
file name : Image_20092024154446677.png
|
2024-09-20 15:44:46.760263 |
416 |
89059302 |
Electric connection |
190430 |
Electric connection1 |
Plinth level |
-
latitude : 23.390195961110294
Longitude : 88.48427957855165
file name : Image_18092024135819061.png
|
2024-09-18 13:58:19.135917 |
417 |
89059302 |
Electric connection |
190430 |
Electric connection1 |
Plinth level |
-
latitude : 23.465962246991694
Longitude : 88.46350628882647
file name : Image_13092024163818643.png
|
2024-09-13 16:38:18.727097 |
418 |
89059302 |
Electric connection |
190430 |
Electric connection1 |
Completion of work |
-
latitude : 23.465904663316905
Longitude : 88.46358331851661
file name : Image_10082024145710218.png
|
2024-08-10 14:57:10.316698 |
419 |
89055326 |
Construction of roads |
29504 |
Construction of roads1 |
Completion of work |
-
latitude : 23.47939135506749,23.47939135506749
Longitude : 88.44443184323609,88.44443184323609
file name : Image_09082024143005230.png
|
2024-08-09 14:30:05.338851 |
420 |
89055326 |
Construction of roads |
29504 |
Construction of roads1 |
Completion of work |
-
latitude : 23.47939135506749,23.47939135506749
Longitude : 88.44443184323609,88.44443184323609
file name : Image_09082024142949593.png
|
2024-08-09 14:29:49.699888 |
421 |
89037843 |
Construction of roads |
90043 |
Construction of roads1 |
Roof laid |
-
latitude : 23.481835308484733,23.48183107562363
Longitude : 88.44342752359807,88.44342618249357
file name : Image_24092024150647399.png
|
2024-09-24 15:06:47.724196 |
422 |
89037843 |
Construction of roads |
90043 |
Construction of roads1 |
Plinth level |
-
latitude : 23.48635248374194,23.48635248374194
Longitude : 88.4483274165541,88.4483274165541
file name : Image_24092024150410700.png
|
2024-09-24 15:04:10.809355 |
423 |
89037843 |
Construction of roads |
90043 |
Construction of roads1 |
Plinth level |
-
latitude : 23.48635248374194,23.48635248374194
Longitude : 88.4483274165541,88.4483274165541
file name : Image_24092024142100936.png
|
2024-09-24 14:21:01.08001 |
424 |
89037843 |
Construction of roads |
90043 |
Construction of roads1 |
Plinth level |
-
latitude : 23.4826482,23.4826482
Longitude : 88.4457718,88.4457718
file name : Image_17082024125211839.png
|
2024-08-17 12:52:11.921939 |
425 |
89037843 |
Construction of roads |
90043 |
Construction of roads1 |
Completion of work |
-
latitude : 23.48265262786299,23.482648227363825
Longitude : 88.44582189805806,88.44582047313452
file name : Image_09082024142922712.png
|
2024-08-09 14:29:22.815005 |
426 |
89037422 |
Construction of roads |
103644 |
Construction of roads1 |
Roof laid |
-
latitude : 23.4913431,23.49106579553336
Longitude : 88.454572,88.45472741872072
file name : Image_30082024163810667.png
|
2024-08-30 16:38:11.279518 |
427 |
89037422 |
Construction of roads |
103644 |
Construction of roads1 |
Plinth level |
-
latitude : 23.491063322871923,23.491063322871923
Longitude : 88.45463806763291,88.45463806763291
file name : Image_30082024155718987.png
|
2024-08-30 15:57:19.837457 |
428 |
89037422 |
Construction of roads |
103644 |
Construction of roads1 |
Completion of work |
-
latitude : 23.4913687,23.4913687
Longitude : 88.4545697,88.4545697
file name : Image_09082024150854664.png
|
2024-08-09 15:08:54.755901 |
429 |
89037645 |
Construction of roads |
84448 |
Construction of roads1 |
Roof laid |
-
latitude : 23.4910812,23.48275065422058
Longitude : 88.4472902,88.44583581201732
file name : Image_30082024152706578.png
|
2024-08-30 15:27:07.023366 |
430 |
89037645 |
Construction of roads |
84448 |
Construction of roads1 |
Plinth level |
-
latitude : 23.490740158595145,23.490739823319018
Longitude : 88.44715646468103,88.44715302810073
file name : Image_16082024132006745.png
|
2024-08-16 13:20:06.842497 |
431 |
89037645 |
Construction of roads |
84448 |
Construction of roads1 |
Completion of work |
-
latitude : 23.49072402343154,23.49072402343154
Longitude : 88.44717155210674,88.44717155210674
file name : Image_09082024133444062.png
|
2024-08-09 13:34:44.176532 |
432 |
89053272 |
Construction of roads |
49869 |
Construction of roads1 |
Roof laid |
-
latitude : 23.4810958,23.48152312450111
Longitude : 88.4476246,88.44745771028101
file name : Image_30082024145941235.png
|
2024-08-30 14:59:42.115901 |
433 |
89053272 |
Construction of roads |
49869 |
Construction of roads1 |
Plinth level |
-
latitude : 23.4811945,23.4811945
Longitude : 88.4475814,88.4475814
file name : Image_30082024143939405.png
|
2024-08-30 14:39:39.995573 |
434 |
89053272 |
Construction of roads |
49869 |
Construction of roads1 |
Completion of work |
-
latitude : 23.4874701,23.4812369
Longitude : 88.4493785,88.44756
file name : Image_09082024140332342.png
|
2024-08-09 14:03:32.435723 |
435 |
89055172 |
Construction of roads |
34030 |
Construction of roads1 |
Completion of work |
-
latitude : 23.478034157305956,23.478034157305956
Longitude : 88.44486233778298,88.44486233778298
file name : Image_09082024142459565.png
|
2024-08-09 14:24:59.674717 |
436 |
89036905 |
Construction of roads |
101165 |
Construction of roads1 |
Roof laid |
-
latitude : 23.49187871441245,23.49187871441245
Longitude : 88.45253152772784,88.45253152772784
file name : Image_30082024154554880.png
|
2024-08-30 15:45:55.582026 |
437 |
89036905 |
Construction of roads |
101165 |
Construction of roads1 |
Plinth level |
-
latitude : 23.4916931,23.4916931
Longitude : 88.4524896,88.4524896
file name : Image_22082024130924336.png
|
2024-08-22 13:09:24.452792 |
438 |
89036905 |
Construction of roads |
101165 |
Construction of roads1 |
Completion of work |
-
latitude : 23.4917519,23.4917519
Longitude : 88.4524884,88.4524884
file name : Image_09082024131516045.png
|
2024-08-09 13:15:16.134297 |
439 |
107003249 |
Procurement of Computer |
100000 |
Procurement of Computer1 |
|
-
latitude : 23.4807577
Longitude : 88.449308
file name : Image_07082024170353577.png
|
2024-08-07 17:03:53.664785 |
440 |
107003249 |
Procurement of Computer |
100000 |
Procurement of Computer1 |
|
-
latitude : 23.4808315
Longitude : 88.4490852
file name : Image_05082024152921588.png
|
2024-08-05 15:29:21.678255 |
441 |
107003276 |
Procurement of Printer |
80000 |
Procurement of Printer1 |
|
-
latitude : 23.40143881738186
Longitude : 88.47416832111776
file name : Image_07082024170448245.png
|
2024-08-07 17:04:48.32644 |
442 |
107003276 |
Procurement of Printer |
80000 |
Procurement of Printer1 |
|
-
latitude : 23.4808324
Longitude : 88.4490863
file name : Image_05082024153007894.png
|
2024-08-05 15:30:07.985271 |
443 |
106943997 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.48438
Longitude : 88.4600046
file name : Image_09082024150239021.png
|
2024-08-09 15:02:39.103015 |
444 |
106943997 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.4843826
Longitude : 88.4600027
file name : Image_05082024141307442.png
|
2024-08-05 14:13:07.531827 |
445 |
106943997 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.4843825
Longitude : 88.4600107
file name : Image_05082024140808511.png
|
2024-08-05 14:08:08.599223 |
446 |
106943997 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.4843825
Longitude : 88.4600107
file name : Image_05082024140651136.png
|
2024-08-05 14:06:51.228687 |
447 |
106943958 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.4851475
Longitude : 88.4490824
file name : Image_09082024130708709.png
|
2024-08-09 13:07:08.806139 |
448 |
106943958 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.4932428
Longitude : 88.4495074
file name : Image_05082024131848780.png
|
2024-08-05 13:18:48.875302 |
449 |
106943958 |
Creation of drainage channel for management of grey water |
350000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.492357
Longitude : 88.4509046
file name : Image_05082024131245860.png
|
2024-08-05 13:12:45.954434 |
450 |
68094443 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.4778337
Longitude : 88.4508311
file name : Image_30122023122811857.png
|
2023-12-30 12:28:11.912618 |
451 |
68094443 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.4808645
Longitude : 88.4492353
file name : Image_16122023135133840.png
|
2023-12-16 13:51:33.902803 |
452 |
68094443 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.4778219
Longitude : 88.4507835
file name : Image_17112023152208602.png
|
2023-11-17 15:22:08.659781 |
453 |
68094443 |
Creation of a new source of drinking water |
241556 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.4778194
Longitude : 88.4508063
file name : Image_06112023133437354.png
|
2023-11-06 13:34:37.415267 |
454 |
89089167 |
Creation of a new source of drinking water |
242363 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.48796042613685
Longitude : 88.46055787056684
file name : Image_12092024125158432.png
|
2024-09-12 12:51:58.513484 |
455 |
89089167 |
Creation of a new source of drinking water |
242363 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.48794588353485
Longitude : 88.46048176288605
file name : Image_12092024124447371.png
|
2024-09-12 12:44:47.449818 |
456 |
89089167 |
Creation of a new source of drinking water |
242363 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.488187114708126
Longitude : 88.46070597879589
file name : Image_13082024125129965.png
|
2024-08-13 12:51:30.074977 |
457 |
89089987 |
Creation of a new source of drinking water |
242363 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.4888335
Longitude : 88.4499631
file name : Image_13082024140620102.png
|
2024-08-13 14:06:20.201694 |
458 |
89121750 |
Creation of a new source of drinking water |
242363 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.456222768872976
Longitude : 88.46622437238693
file name : Image_13092024162955171.png
|
2024-09-13 16:29:55.251894 |
459 |
89121750 |
Creation of a new source of drinking water |
242363 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.45621220767498
Longitude : 88.46620140597224
file name : Image_14082024131643936.png
|
2024-08-14 13:16:44.143217 |
460 |
89387635 |
Construction of Community Sanitary Complex |
327426 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.484516302123666
Longitude : 88.45293838530779
file name : Image_14082024142359644.png
|
2024-08-14 14:23:59.756819 |
461 |
89387635 |
Construction of Community Sanitary Complex |
327426 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.484586039558053
Longitude : 88.45285842195153
file name : Image_14082024140336150.png
|
2024-08-14 14:03:36.256046 |
462 |
89089486 |
Creation of a new source of drinking water |
242363 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.4886287
Longitude : 88.4556159
file name : Image_18092024141105431.png
|
2024-09-18 14:11:05.51075 |
463 |
89089486 |
Creation of a new source of drinking water |
242363 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.488875897601247
Longitude : 88.45518741756678
file name : Image_18092024140618206.png
|
2024-09-18 14:06:18.307873 |
464 |
89089486 |
Creation of a new source of drinking water |
242363 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.48865
Longitude : 88.4556674
file name : Image_13082024141725002.png
|
2024-08-13 14:17:25.095458 |
465 |
89125853 |
Construction of Community Sanitary Complex |
327426 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.4835574
Longitude : 88.4517419
file name : Image_04092024154433402.png
|
2024-09-04 15:44:33.499914 |
466 |
89125853 |
Construction of Community Sanitary Complex |
327426 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.4862325
Longitude : 88.447998
file name : Image_13082024140342828.png
|
2024-08-13 14:03:42.915529 |
467 |
89037820 |
Construction of roads |
42724 |
Construction of roads1 |
Roof laid |
-
latitude : 23.4820183,23.4820183
Longitude : 88.446697,88.446697
file name : Image_02092024144536789.png
|
2024-09-02 14:45:36.891882 |
468 |
89037820 |
Construction of roads |
42724 |
Construction of roads1 |
Plinth level |
-
latitude : 23.4826373,23.4826373
Longitude : 88.4457751,88.4457751
file name : Image_30082024151241111.png
|
2024-08-30 15:12:41.371046 |
469 |
89037820 |
Construction of roads |
42724 |
Construction of roads1 |
Completion of work |
-
latitude : 23.492714851163328,23.492714851163328
Longitude : 88.4504134207964,88.4504134207964
file name : Image_13082024134835160.png
|
2024-08-13 13:48:35.252678 |
470 |
89037872 |
Construction of roads |
71255 |
Construction of roads1 |
Completion of work |
-
latitude : 23.4807506,23.4807506
Longitude : 88.4492885,88.4492885
file name : Image_25092024171655982.png
|
2024-09-25 17:16:56.06391 |
471 |
89037872 |
Construction of roads |
71255 |
Construction of roads1 |
Completion of work |
-
latitude : 23.482107175514102,23.482080604881048
Longitude : 88.45458366908133,88.45458115451038
file name : Image_13082024144432474.png
|
2024-08-13 14:44:32.592103 |
472 |
89059539 |
Construction of roads |
103644 |
Construction of roads1 |
Roof laid |
-
latitude : 23.45784303266555,23.45784303266555
Longitude : 88.46117368899286,88.46117368899286
file name : Image_07092024130611322.png
|
2024-09-07 13:07:16.214118 |
473 |
89059539 |
Construction of roads |
103644 |
Construction of roads1 |
Plinth level |
-
latitude : 23.4575847,23.4575847
Longitude : 88.461682,88.461682
file name : Image_07092024125242060.png
|
2024-09-07 12:53:46.823902 |
474 |
89059539 |
Construction of roads |
103644 |
Construction of roads1 |
Completion of work |
-
latitude : 23.37159446440637,23.37159446440637,23.45790748950094
Longitude : 88.48292380571365,88.48292380571365,88.46112289465964
file name : Image_07092024124646104.png
|
2024-09-07 12:47:50.740068 |
475 |
89585401 |
Construction of Gram Panchayat Bhawan |
200000 |
Construction of Gram Panchayat Bhawan1 |
Plinth level |
-
latitude : 23.4807899
Longitude : 88.4492258
file name : Image_14082024142730627.png
|
2024-08-14 14:27:30.99765 |
476 |
89585401 |
Construction of Gram Panchayat Bhawan |
200000 |
Construction of Gram Panchayat Bhawan1 |
Completion of work |
-
latitude : 23.4807836
Longitude : 88.4492095
file name : Image_14082024135438095.png
|
2024-08-14 13:54:38.191002 |
477 |
68093444 |
Creation of a new source of drinking water |
242363 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.481169450096786
Longitude : 88.4454723726958
file name : Image_20082024160409285.png
|
2024-08-20 16:04:09.396945 |
478 |
68093444 |
Creation of a new source of drinking water |
242363 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.481297441758215
Longitude : 88.44506618566811
file name : Image_20082024124415030.png
|
2024-08-20 12:44:15.119619 |
479 |
68093444 |
Creation of a new source of drinking water |
242363 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.48127615172416
Longitude : 88.44514103606343
file name : Image_17082024124924112.png
|
2024-08-17 12:49:24.218754 |
480 |
68093444 |
Creation of a new source of drinking water |
242363 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.481267476454377
Longitude : 88.44518135301769
file name : Image_17082024123610064.png
|
2024-08-17 12:36:10.155701 |
481 |
68105610 |
Creation of drainage channel for management of grey water |
347931 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.43560106586665
Longitude : 88.4670549351722
file name : Image_28082024111344028.png
|
2024-08-28 11:13:44.291789 |
482 |
68105610 |
Creation of drainage channel for management of grey water |
347931 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.4658203
Longitude : 88.4634789
file name : Image_24082024123000738.png
|
2024-08-24 12:30:00.832154 |
483 |
68105610 |
Creation of drainage channel for management of grey water |
347931 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.466020082123578
Longitude : 88.46306255087256
file name : Image_24082024121624469.png
|
2024-08-24 12:16:24.55336 |
484 |
68105610 |
Creation of drainage channel for management of grey water |
347931 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.46592637244612
Longitude : 88.46341324970126
file name : Image_17082024144521110.png
|
2024-08-17 14:45:21.209965 |
485 |
68105610 |
Creation of drainage channel for management of grey water |
347931 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.46593982540071
Longitude : 88.46340713091195
file name : Image_17082024134938915.png
|
2024-08-17 13:49:38.991553 |
486 |
68105610 |
Creation of drainage channel for management of grey water |
347931 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.46591342240572
Longitude : 88.46335239708424
file name : Image_17082024134930704.png
|
2024-08-17 13:49:30.797573 |