1 |
39074062 |
Construction of Culvert at Durganagar Khal |
350000 |
Construction of Culvert at Durganagar Khal1 |
Roof laid |
-
latitude : 23.114892351441085,23.114888537675142
Longitude : 88.54201404377818,88.54202041402459
file name : Image_25082021140821049.png
|
2021-08-25 14:08:21.149451 |
2 |
39074062 |
Construction of Culvert at Durganagar Khal |
350000 |
Construction of Culvert at Durganagar Khal1 |
Plinth level |
-
latitude : 23.114902996458113,23.114902996458113
Longitude : 88.54198034852743,88.54198034852743
file name : Image_25082021140637073.png
|
2021-08-25 14:06:37.177618 |
3 |
39074062 |
Construction of Culvert at Durganagar Khal |
350000 |
Construction of Culvert at Durganagar Khal1 |
Completion of work |
-
latitude : 23.11489717103541,23.11489717103541
Longitude : 88.54195570573211,88.54195570573211
file name : Image_25082021140354890.png
|
2021-08-25 14:03:55.045077 |
4 |
39072783 |
Construction of Drain from House of Swarnalata Sishu uddan to House of Jyostna Dutta |
300000 |
Construction of Drain from House of Swarnalata Sishu uddan to House of Jyostna Dutta1 |
Roof laid |
-
latitude : 23.1273813,23.1269895
Longitude : 88.5428796,88.5426437
file name : Image_14022022182952139.png
|
2022-02-14 18:29:52.283619 |
5 |
39072783 |
Construction of Drain from House of Swarnalata Sishu uddan to House of Jyostna Dutta |
300000 |
Construction of Drain from House of Swarnalata Sishu uddan to House of Jyostna Dutta1 |
Plinth level |
-
latitude : 23.1271397,23.1271397
Longitude : 88.5431566,88.5431566
file name : Image_08022022102347039.png
|
2022-02-08 10:23:47.193596 |
6 |
39072783 |
Construction of Drain from House of Swarnalata Sishu uddan to House of Jyostna Dutta |
300000 |
Construction of Drain from House of Swarnalata Sishu uddan to House of Jyostna Dutta1 |
Completion of work |
-
latitude : 23.1270844,23.1270844
Longitude : 88.5431609,88.5431609
file name : Image_20012022110855003.png
|
2022-01-20 11:08:55.128158 |
7 |
39073977 |
Improvementof Drain from Baninagar Pry school towards Play Ground |
300000 |
Improvementof Drain from Baninagar Pry school towards Play Ground1 |
Roof laid |
-
latitude : 23.1200914,23.1200914,23.122779177501798
Longitude : 88.5361381,88.5361381,88.54204664938152
file name : Image_09102021102729579.png
|
2021-10-09 10:27:29.701509 |
8 |
39073977 |
Improvementof Drain from Baninagar Pry school towards Play Ground |
300000 |
Improvementof Drain from Baninagar Pry school towards Play Ground1 |
Plinth level |
-
latitude : 23.1222039,23.1222039
Longitude : 88.5425231,88.5425231
file name : Image_02102021114534392.png
|
2021-10-02 11:45:34.515105 |
9 |
39073977 |
Improvementof Drain from Baninagar Pry school towards Play Ground |
300000 |
Improvementof Drain from Baninagar Pry school towards Play Ground1 |
Completion of work |
-
latitude : 23.1232116,23.1232116
Longitude : 88.5427785,88.5427785
file name : Image_25082021133806425.png
|
2021-08-25 13:38:06.540173 |
10 |
39071985 |
Construction of Drain from house Ram charan Barman towards Tangrajola |
300000 |
Construction of Drain from house Ram charan Barman towards Tangrajola1 |
Roof laid |
-
latitude : 23.13802057877183,23.13802057877183
Longitude : 88.5426280181855,88.5426280181855
file name : Image_28022022094437409.png
|
2022-02-28 09:44:37.523419 |
11 |
39071985 |
Construction of Drain from house Ram charan Barman towards Tangrajola |
300000 |
Construction of Drain from house Ram charan Barman towards Tangrajola1 |
Plinth level |
-
latitude : 23.138166549615562,23.138170740567148
Longitude : 88.5425101686269,88.54251762852073
file name : Image_25022022123727573.png
|
2022-02-25 12:37:27.727985 |
12 |
39071985 |
Construction of Drain from house Ram charan Barman towards Tangrajola |
300000 |
Construction of Drain from house Ram charan Barman towards Tangrajola1 |
Completion of work |
-
latitude : 23.13811831176281,23.13811831176281
Longitude : 88.54259549640119,88.54259549640119
file name : Image_18022022170132715.png
|
2022-02-18 17:01:32.833817 |
13 |
39071985 |
Construction of Drain from house Ram charan Barman towards Tangrajola |
300000 |
Construction of Drain from house Ram charan Barman towards Tangrajola1 |
Completion of work |
-
latitude : 23.138642515987158,23.138674241490662
Longitude : 88.54250446893275,88.5425001103431
file name : Image_22122021132847279.png
|
2021-12-22 13:28:47.418851 |
14 |
39065887 |
Improvement of Concreat road from Nishikanta Bhakta towards Sankar sarkar and Tapan Ganguli |
141602 |
Improvement of Concreat road from Nishikanta Bhakta towards Sankar sarkar and Tapan Ganguli1 |
Completion of work |
-
latitude : 23.1229387,23.1229387
Longitude : 88.5475391,88.5475391
file name : Image_24022021144040550.png
|
2021-02-24 14:40:40.662408 |
15 |
39073946 |
Improvement of Drain from house of Shyamal Biswas towards Pally unnayan Samity to Baroary math |
250000 |
Improvement of Drain from house of Shyamal Biswas towards Pally unnayan Samity to Baroary math1 |
Completion of work |
-
latitude : 23.12912503257394,23.129144017584622
Longitude : 88.53510735556483,88.53511062450707
file name : Image_25082021132723838.png
|
2021-08-25 13:27:23.949438 |
16 |
39073869 |
Construction of Drain at sansad no 21 |
350000 |
Construction of Drain at sansad no 211 |
Completion of work |
-
latitude : 23.1296964,23.1296964
Longitude : 88.5464871,88.5464871
file name : Image_20122021152938447.png
|
2021-12-20 15:29:38.588487 |
17 |
39073869 |
Construction of Drain at sansad no 21 |
350000 |
Construction of Drain at sansad no 211 |
Completion of work |
-
latitude : 23.129570614546537,23.129569818265736
Longitude : 88.54389150626957,88.54388480074704
file name : Image_20122021151338099.png
|
2021-12-20 15:13:38.221149 |
18 |
39073869 |
Construction of Drain at sansad no 21 |
350000 |
Construction of Drain at sansad no 211 |
Completion of work |
-
latitude : 23.129570614546537,23.129569818265736
Longitude : 88.54389150626957,88.54388480074704
file name : Image_20122021151837097.png
|
2021-12-20 15:18:37.225791 |
19 |
39073748 |
Construction of Drain from at Sansad no 22 |
300000 |
Construction of Drain from at Sansad no 221 |
Completion of work |
-
latitude : 23.128631212748587,23.128631212748587
Longitude : 88.54192276485264,88.54192276485264
file name : Image_20122021152424102.png
|
2021-12-20 15:24:24.287776 |
20 |
39084132 |
Improvement of Concreat road from shyamal Paul towards Bachu Sen |
130000 |
Improvement of Concreat road from shyamal Paul towards Bachu Sen1 |
Roof laid |
-
latitude : 23.1263965,23.1263965
Longitude : 88.547008,88.547008
file name : Image_24032022090726530.png
|
2022-03-24 09:07:26.634755 |
21 |
39084132 |
Improvement of Concreat road from shyamal Paul towards Bachu Sen |
130000 |
Improvement of Concreat road from shyamal Paul towards Bachu Sen1 |
Plinth level |
-
latitude : 23.1266538,23.1266538
Longitude : 88.5475215,88.5475215
file name : Image_23032022113357238.png
|
2022-03-23 11:33:57.417086 |
22 |
39084132 |
Improvement of Concreat road from shyamal Paul towards Bachu Sen |
130000 |
Improvement of Concreat road from shyamal Paul towards Bachu Sen1 |
Completion of work |
-
latitude : 23.1264168,23.1264168
Longitude : 88.5471739,88.5471739
file name : Image_16032022094330938.png
|
2022-03-16 09:43:31.08656 |
23 |
39057309 |
Construction of Concreat road from Balai Durlav to Biswa Dulav |
200000 |
Construction of Concreat road from Balai Durlav to Biswa Dulav 1 |
Roof laid |
-
latitude : 23.12180394306779,23.121810271404684
Longitude : 88.52393193170428,88.52392447181046
file name : Image_31032022122642878.png
|
2022-03-31 12:26:43.003026 |
24 |
39057309 |
Construction of Concreat road from Balai Durlav to Biswa Dulav |
200000 |
Construction of Concreat road from Balai Durlav to Biswa Dulav 1 |
Plinth level |
-
latitude : 23.121814085170627,23.12179966829717
Longitude : 88.52411490865052,88.52390242740512
file name : Image_29032022160218823.png
|
2022-03-29 16:02:18.940705 |
25 |
39057309 |
Construction of Concreat road from Balai Durlav to Biswa Dulav |
200000 |
Construction of Concreat road from Balai Durlav to Biswa Dulav 1 |
Completion of work |
-
latitude : 23.12185968272388,23.12185968272388
Longitude : 88.52389362640679,88.52389362640679
file name : Image_16032022160944543.png
|
2022-03-16 16:09:44.679493 |
26 |
48244082 |
COMMUNITY TOILET AT JAGPUR HEALTH SUB CENTER |
700000 |
COMMUNITY TOILET AT JAGPUR HEALTH SUB CENTER1 |
Roof laid |
-
latitude : 23.124798964709044
Longitude : 88.52928972803056
file name : Image_04072022121815108.png
|
2022-07-04 12:18:15.209731 |
27 |
48244082 |
COMMUNITY TOILET AT JAGPUR HEALTH SUB CENTER |
700000 |
COMMUNITY TOILET AT JAGPUR HEALTH SUB CENTER1 |
Plinth level |
-
latitude : 23.124834462068975
Longitude : 88.5290387738496
file name : Image_10052022094304959.png
|
2022-05-10 09:43:05.0636 |
28 |
48244082 |
COMMUNITY TOILET AT JAGPUR HEALTH SUB CENTER |
700000 |
COMMUNITY TOILET AT JAGPUR HEALTH SUB CENTER1 |
Completion of work |
-
latitude : 23.12483228277415
Longitude : 88.52907674387097
file name : Image_01042022123914639.png
|
2022-04-01 12:39:14.774009 |
29 |
61871761 |
CONSTRUCTION OF PCC ROAD FROM H/O ARUNABHA BHOWMICK TOWARDS H/O SOURABH BASU AT PARBATIPUR SANSAD IX |
48099 |
CONSTRUCTION OF PCC ROAD FROM H/O ARUNABHA BHOWMICK TOWARDS H/O SOURABH BASU AT PARBATIPUR SANSAD IX1 |
Roof laid |
-
latitude : 23.1278691,23.1278691
Longitude : 88.5430336,88.5430336
file name : Image_21052022103023159.png
|
2022-05-21 10:30:23.254805 |
30 |
61871761 |
CONSTRUCTION OF PCC ROAD FROM H/O ARUNABHA BHOWMICK TOWARDS H/O SOURABH BASU AT PARBATIPUR SANSAD IX |
48099 |
CONSTRUCTION OF PCC ROAD FROM H/O ARUNABHA BHOWMICK TOWARDS H/O SOURABH BASU AT PARBATIPUR SANSAD IX1 |
Plinth level |
-
latitude : 23.1279395,23.1279395
Longitude : 88.5429798,88.5429798
file name : Image_20052022104705253.png
|
2022-05-20 10:47:05.38372 |
31 |
61871761 |
CONSTRUCTION OF PCC ROAD FROM H/O ARUNABHA BHOWMICK TOWARDS H/O SOURABH BASU AT PARBATIPUR SANSAD IX |
48099 |
CONSTRUCTION OF PCC ROAD FROM H/O ARUNABHA BHOWMICK TOWARDS H/O SOURABH BASU AT PARBATIPUR SANSAD IX1 |
Completion of work |
-
latitude : 23.1279675,23.1279675
Longitude : 88.5430604,88.5430604
file name : Image_26042022112058315.png
|
2022-04-26 11:20:58.398286 |
32 |
35234618 |
CONSTRUCTION OF PCC ROAD FROM H/O SUBODH BISWAS TOWARDS H/O BINAY DAS |
106786 |
CONSTRUCTION OF PCC ROAD FROM H/O SUBODH BISWAS TOWARDS H/O BINAY DAS1 |
Roof laid |
-
latitude : 23.1354411,23.135444903746247
Longitude : 88.5409773,88.5400689393282
file name : Image_10052022083149591.png
|
2022-05-10 08:31:49.675157 |
33 |
35234618 |
CONSTRUCTION OF PCC ROAD FROM H/O SUBODH BISWAS TOWARDS H/O BINAY DAS |
106786 |
CONSTRUCTION OF PCC ROAD FROM H/O SUBODH BISWAS TOWARDS H/O BINAY DAS1 |
Plinth level |
-
latitude : 23.13523879274726,23.13523879274726
Longitude : 88.54001051746309,88.54001051746309
file name : Image_05052022114551975.png
|
2022-05-05 11:45:52.083085 |
34 |
35234618 |
CONSTRUCTION OF PCC ROAD FROM H/O SUBODH BISWAS TOWARDS H/O BINAY DAS |
106786 |
CONSTRUCTION OF PCC ROAD FROM H/O SUBODH BISWAS TOWARDS H/O BINAY DAS1 |
Completion of work |
-
latitude : 23.1193674,23.1193674
Longitude : 88.5447726,88.5447726
file name : Image_25042022150340041.png
|
2022-04-25 15:03:40.129416 |
35 |
57356017 |
MAINTAINANCE AND PURCHASE OF STREET LIGHT AT ALL SANSAD OF GRAM PANCHAYET |
300000 |
MAINTAINANCE AND PURCHASE OF STREET LIGHT AT ALL SANSAD OF GRAM PANCHAYET1 |
Roof laid |
-
latitude : 23.1315891
Longitude : 88.5433262
file name : Image_29092022133548282.png
|
2022-09-29 13:35:48.329928 |
36 |
57356017 |
MAINTAINANCE AND PURCHASE OF STREET LIGHT AT ALL SANSAD OF GRAM PANCHAYET |
300000 |
MAINTAINANCE AND PURCHASE OF STREET LIGHT AT ALL SANSAD OF GRAM PANCHAYET1 |
Plinth level |
-
latitude : 23.1315957
Longitude : 88.5433262
file name : Image_29092022133151683.png
|
2022-09-29 13:31:51.747764 |
37 |
57356017 |
MAINTAINANCE AND PURCHASE OF STREET LIGHT AT ALL SANSAD OF GRAM PANCHAYET |
300000 |
MAINTAINANCE AND PURCHASE OF STREET LIGHT AT ALL SANSAD OF GRAM PANCHAYET1 |
Completion of work |
-
latitude : 23.1315914
Longitude : 88.5433286
file name : Image_29092022132809390.png
|
2022-09-29 13:28:09.441344 |
38 |
48162950 |
CONSTRUCTION OF PCC ROAD FROM H/O SATYAJIT KUNDU TOWARDS H/O HRAADHAN PAL AT SANSAD NO XVI |
150000 |
CONSTRUCTION OF PCC ROAD FROM H/O SATYAJIT KUNDU TOWARDS H/O HRAADHAN PAL AT SANSAD NO XVI1 |
Roof laid |
-
latitude : 23.1292674,23.1292674
Longitude : 88.5481997,88.5481997
file name : Image_11112022092838491.png
|
2022-11-11 09:28:38.578461 |
39 |
48162950 |
CONSTRUCTION OF PCC ROAD FROM H/O SATYAJIT KUNDU TOWARDS H/O HRAADHAN PAL AT SANSAD NO XVI |
150000 |
CONSTRUCTION OF PCC ROAD FROM H/O SATYAJIT KUNDU TOWARDS H/O HRAADHAN PAL AT SANSAD NO XVI1 |
Plinth level |
-
latitude : 23.1289992,23.1289992
Longitude : 88.5477786,88.5477786
file name : Image_09112022100300806.png
|
2022-11-09 10:03:00.872079 |
40 |
48162950 |
CONSTRUCTION OF PCC ROAD FROM H/O SATYAJIT KUNDU TOWARDS H/O HRAADHAN PAL AT SANSAD NO XVI |
150000 |
CONSTRUCTION OF PCC ROAD FROM H/O SATYAJIT KUNDU TOWARDS H/O HRAADHAN PAL AT SANSAD NO XVI1 |
Completion of work |
-
latitude : 23.1288667,23.1288667
Longitude : 88.5470661,88.5470661
file name : Image_01112022144847637.png
|
2022-11-01 14:48:47.727496 |
41 |
48248479 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O HAREKRISHNA BISWAS TOWARDS H/O KENARAM KASIBASHI |
555000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O HAREKRISHNA BISWAS TOWARDS H/O KENARAM KASIBASHI1 |
Roof laid |
-
latitude : 23.12884495127946,23.128844783641398
Longitude : 88.51340962573886,88.51340937428176
file name : Image_12122022122739724.png
|
2022-12-12 12:27:39.798429 |
42 |
48248479 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O HAREKRISHNA BISWAS TOWARDS H/O KENARAM KASIBASHI |
555000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O HAREKRISHNA BISWAS TOWARDS H/O KENARAM KASIBASHI1 |
Plinth level |
-
latitude : 23.128796126693487,23.128796126693487
Longitude : 88.51309237070382,88.51309237070382
file name : Image_30112022092008964.png
|
2022-11-30 09:20:09.028697 |
43 |
48248479 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O HAREKRISHNA BISWAS TOWARDS H/O KENARAM KASIBASHI |
555000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O HAREKRISHNA BISWAS TOWARDS H/O KENARAM KASIBASHI1 |
Completion of work |
-
latitude : 23.12878778669983,23.12878778669983
Longitude : 88.51305942982435,88.51305942982435
file name : Image_22112022091203451.png
|
2022-11-22 09:12:03.511333 |
44 |
64318189 |
CONSTRUCTION COMMUNITY TOILET AT TOWN CLUB GROUND AT PARBATIPUR SANSAD NO XXI |
220000 |
CONSTRUCTION COMMUNITY TOILET AT TOWN CLUB GROUND AT PARBATIPUR SANSAD NO XXI1 |
Roof laid |
-
latitude : 23.1293447
Longitude : 88.5413283
file name : Image_15122022122729551.png
|
2022-12-15 12:27:29.654913 |
45 |
64318189 |
CONSTRUCTION COMMUNITY TOILET AT TOWN CLUB GROUND AT PARBATIPUR SANSAD NO XXI |
220000 |
CONSTRUCTION COMMUNITY TOILET AT TOWN CLUB GROUND AT PARBATIPUR SANSAD NO XXI1 |
Plinth level |
-
latitude : 23.1293915
Longitude : 88.5412847
file name : Image_23112022160945257.png
|
2022-11-23 16:09:45.338037 |
46 |
64318189 |
CONSTRUCTION COMMUNITY TOILET AT TOWN CLUB GROUND AT PARBATIPUR SANSAD NO XXI |
220000 |
CONSTRUCTION COMMUNITY TOILET AT TOWN CLUB GROUND AT PARBATIPUR SANSAD NO XXI1 |
Completion of work |
-
latitude : 23.1293924
Longitude : 88.5412797
file name : Image_18112022130949823.png
|
2022-11-18 13:09:49.888212 |
47 |
39059564 |
Reparing Blacktop road from Karuna sarkar to Shambhu Saha |
178623 |
Reparing Blacktop road from Karuna sarkar to Shambhu Saha1 |
Roof laid |
-
latitude : 23.130060201510787,23.130060201510787
Longitude : 88.54943932034075,88.54943932034075
file name : Image_18062021132051337.png
|
2021-06-18 13:20:51.968821 |
48 |
39059564 |
Reparing Blacktop road from Karuna sarkar to Shambhu Saha |
178623 |
Reparing Blacktop road from Karuna sarkar to Shambhu Saha1 |
Plinth level |
-
latitude : 23.130060201510787,23.1241773
Longitude : 88.54943932034075,88.5351364
file name : Image_18062021131835908.png
|
2021-06-18 13:18:36.528078 |
49 |
39059564 |
Reparing Blacktop road from Karuna sarkar to Shambhu Saha |
178623 |
Reparing Blacktop road from Karuna sarkar to Shambhu Saha1 |
Completion of work |
-
latitude : 23.130060201510787,23.130060201510787
Longitude : 88.54943932034075,88.54943932034075
file name : Image_18062021131621179.png
|
2021-06-18 13:16:21.79838 |
50 |
39066661 |
Improvement of concreat road from Bhupal Bharadaj towards house of Srikanta Kundu |
125000 |
Improvement of concreat road from Bhupal Bharadaj towards house of Srikanta Kundu1 |
Roof laid |
-
latitude : 23.1299481773749,23.129915152676404
Longitude : 88.54203332215548,88.54211538098752
file name : Image_17062021131428627.png
|
2021-06-17 13:14:28.969489 |
51 |
39066661 |
Improvement of concreat road from Bhupal Bharadaj towards house of Srikanta Kundu |
125000 |
Improvement of concreat road from Bhupal Bharadaj towards house of Srikanta Kundu1 |
Plinth level |
-
latitude : 23.129924372769892,23.129902789369226
Longitude : 88.54211739264429,88.54212602600455
file name : Image_17062021130849197.png
|
2021-06-17 13:08:49.525952 |
52 |
39066661 |
Improvement of concreat road from Bhupal Bharadaj towards house of Srikanta Kundu |
125000 |
Improvement of concreat road from Bhupal Bharadaj towards house of Srikanta Kundu1 |
Completion of work |
-
latitude : 23.1297841,23.129972736351192
Longitude : 88.538342,88.54201404377818
file name : Image_17062021125746355.png
|
2021-06-17 12:57:46.690498 |
53 |
39067506 |
Improvement of concreat road from house of Kalu Som towards house of Tapan Roy |
248959 |
Improvement of concreat road from house of Kalu Som towards house of Tapan Roy1 |
Roof laid |
-
latitude : 23.1325356,23.1325356
Longitude : 88.5456588,88.5456588
file name : Image_18062021121403720.png
|
2021-06-18 12:14:04.324593 |
54 |
39067506 |
Improvement of concreat road from house of Kalu Som towards house of Tapan Roy |
248959 |
Improvement of concreat road from house of Kalu Som towards house of Tapan Roy1 |
Plinth level |
-
latitude : 23.13263818155974,23.1326256506145
Longitude : 88.54588304646313,88.54584641754627
file name : Image_18062021121131648.png
|
2021-06-18 12:11:32.256633 |
55 |
39067506 |
Improvement of concreat road from house of Kalu Som towards house of Tapan Roy |
248959 |
Improvement of concreat road from house of Kalu Som towards house of Tapan Roy1 |
Completion of work |
-
latitude : 23.1324022,23.1321996
Longitude : 88.5457118,88.5458856
file name : Image_18062021120636818.png
|
2021-06-18 12:06:37.411398 |
56 |
39063407 |
Improvement of Blacktop road from Tanmaye Sarkar towards Souren Dey |
349964 |
Improvement of Blacktop road from Tanmaye Sarkar towards Souren Dey 1 |
Roof laid |
-
latitude : 23.1298813,23.1300466
Longitude : 88.5495218,88.5494946
file name : Image_18062021125314830.png
|
2021-06-18 12:53:15.451849 |
57 |
39063407 |
Improvement of Blacktop road from Tanmaye Sarkar towards Souren Dey |
349964 |
Improvement of Blacktop road from Tanmaye Sarkar towards Souren Dey 1 |
Plinth level |
-
latitude : 23.1299373,23.1300512
Longitude : 88.5494899,88.5493706
file name : Image_18062021125033275.png
|
2021-06-18 12:50:33.894597 |
58 |
39063407 |
Improvement of Blacktop road from Tanmaye Sarkar towards Souren Dey |
349964 |
Improvement of Blacktop road from Tanmaye Sarkar towards Souren Dey 1 |
Completion of work |
-
latitude : 23.1300528,23.1300423
Longitude : 88.549548,88.5491625
file name : Image_18062021124755883.png
|
2021-06-18 12:47:56.515565 |
59 |
39060222 |
Construction of Concreat road fromMonoranjan Das to Sanjoy Saha |
200000 |
Construction of Concreat road fromMonoranjan Das to Sanjoy Saha1 |
Roof laid |
-
latitude : 23.1284332,23.1284332
Longitude : 88.5450865,88.5450865
file name : Image_29122021144634854.png
|
2021-12-29 14:46:35.017618 |
60 |
39060222 |
Construction of Concreat road fromMonoranjan Das to Sanjoy Saha |
200000 |
Construction of Concreat road fromMonoranjan Das to Sanjoy Saha1 |
Roof laid |
-
latitude : 23.1284396,23.1284396
Longitude : 88.5450615,88.5450615
file name : Image_29122021144226905.png
|
2021-12-29 14:42:27.196038 |
61 |
39060222 |
Construction of Concreat road fromMonoranjan Das to Sanjoy Saha |
200000 |
Construction of Concreat road fromMonoranjan Das to Sanjoy Saha1 |
Plinth level |
-
latitude : 23.1286242,23.1286218,23.1286218
Longitude : 88.5448573,88.5448241,88.5448241
file name : Image_28122021131137108.png
|
2021-12-28 13:11:37.244441 |
62 |
39060222 |
Construction of Concreat road fromMonoranjan Das to Sanjoy Saha |
200000 |
Construction of Concreat road fromMonoranjan Das to Sanjoy Saha1 |
Completion of work |
-
latitude : 23.1284881,23.1284887,23.1284887
Longitude : 88.545145,88.5451291,88.5451291
file name : Image_15122021125759531.png
|
2021-12-15 12:57:59.699857 |
63 |
39075961 |
Development of Jogpur pri parimary Health centre |
300000 |
Development of Jogpur pri parimary Health centre 1 |
Roof laid |
-
latitude : 23.124776165932417
Longitude : 88.529211608693
file name : Image_25012022161333020.png
|
2022-01-25 16:13:33.152861 |
64 |
39075961 |
Development of Jogpur pri parimary Health centre |
300000 |
Development of Jogpur pri parimary Health centre 1 |
Plinth level |
-
latitude : 23.124837772920728
Longitude : 88.52920230478048
file name : Image_21012022143418236.png
|
2022-01-21 14:34:18.372207 |
65 |
39075961 |
Development of Jogpur pri parimary Health centre |
300000 |
Development of Jogpur pri parimary Health centre 1 |
Completion of work |
-
latitude : 23.118728161789477
Longitude : 88.54050731286407
file name : Image_24122021135303177.png
|
2021-12-24 13:53:03.319747 |
66 |
39059995 |
Construction of Concreat road fromSwadesh Paul to Dulal Biswas |
100000 |
Construction of Concreat road fromSwadesh Paul to Dulal Biswas1 |
Roof laid |
-
latitude : 23.1263005,23.1263005
Longitude : 88.5415014,88.5415014
file name : Image_04012022093414610.png
|
2022-01-04 09:34:14.755968 |
67 |
39059995 |
Construction of Concreat road fromSwadesh Paul to Dulal Biswas |
100000 |
Construction of Concreat road fromSwadesh Paul to Dulal Biswas1 |
Plinth level |
-
latitude : 23.126002396456897,23.126002396456897
Longitude : 88.54070839472115,88.54070839472115
file name : Image_01012022125013235.png
|
2022-01-01 12:50:13.379244 |
68 |
39059995 |
Construction of Concreat road fromSwadesh Paul to Dulal Biswas |
100000 |
Construction of Concreat road fromSwadesh Paul to Dulal Biswas1 |
Completion of work |
-
latitude : 23.1262817,23.1262817
Longitude : 88.5414537,88.5414537
file name : Image_20122021150638405.png
|
2021-12-20 15:06:38.521345 |
69 |
39057518 |
Construction Concreat road from Bishnupada Biswas to Haouse of Bhadu Biswas |
241005 |
Construction Concreat road from Bishnupada Biswas to Haouse of Bhadu Biswas1 |
Roof laid |
-
latitude : 23.1279871,23.1279871
Longitude : 88.5255047,88.5255047
file name : Image_08012022125109810.png
|
2022-01-08 12:51:09.9526 |
70 |
39057518 |
Construction Concreat road from Bishnupada Biswas to Haouse of Bhadu Biswas |
241005 |
Construction Concreat road from Bishnupada Biswas to Haouse of Bhadu Biswas1 |
Plinth level |
-
latitude : 23.127251300029457,23.127251300029457
Longitude : 88.52553471922874,88.52553471922874
file name : Image_04012022161600521.png
|
2022-01-04 16:16:00.659533 |
71 |
39057518 |
Construction Concreat road from Bishnupada Biswas to Haouse of Bhadu Biswas |
241005 |
Construction Concreat road from Bishnupada Biswas to Haouse of Bhadu Biswas1 |
Completion of work |
-
latitude : 23.127274392172694,23.127274392172694
Longitude : 88.5255390778184,88.5255390778184
file name : Image_04012022094645037.png
|
2022-01-04 09:46:45.216243 |
72 |
39063042 |
Improvement of BFS road from Prangopal Guha towards House of Chandan Chakraborty |
150000 |
Improvement of BFS road from Prangopal Guha towards House of Chandan Chakraborty 1 |
Roof laid |
-
latitude : 23.1222236,23.1222236
Longitude : 88.5444405,88.5444405
file name : Image_11012022154051304.png
|
2022-01-11 15:40:51.438567 |
73 |
39063042 |
Improvement of BFS road from Prangopal Guha towards House of Chandan Chakraborty |
150000 |
Improvement of BFS road from Prangopal Guha towards House of Chandan Chakraborty 1 |
Roof laid |
-
latitude : 23.1222438,23.1222438
Longitude : 88.5444215,88.5444215
file name : Image_11012022152717534.png
|
2022-01-11 15:27:17.67901 |
74 |
39063042 |
Improvement of BFS road from Prangopal Guha towards House of Chandan Chakraborty |
150000 |
Improvement of BFS road from Prangopal Guha towards House of Chandan Chakraborty 1 |
Plinth level |
-
latitude : 23.1222565,23.1222565
Longitude : 88.5444325,88.5444325
file name : Image_08012022130720998.png
|
2022-01-08 13:07:21.128794 |
75 |
39063042 |
Improvement of BFS road from Prangopal Guha towards House of Chandan Chakraborty |
150000 |
Improvement of BFS road from Prangopal Guha towards House of Chandan Chakraborty 1 |
Completion of work |
-
latitude : 23.1219504,23.1219504
Longitude : 88.5452347,88.5452347
file name : Image_20122021152353472.png
|
2021-12-20 15:23:53.611412 |
76 |
39063042 |
Improvement of BFS road from Prangopal Guha towards House of Chandan Chakraborty |
150000 |
Improvement of BFS road from Prangopal Guha towards House of Chandan Chakraborty 1 |
Completion of work |
-
latitude : 23.121949,23.121949
Longitude : 88.545232,88.545232
file name : Image_20122021152428947.png
|
2021-12-20 15:24:29.095209 |
77 |
39060091 |
Construction of Concreat road fromBikash Biswas to Narayan Dey |
150000 |
Construction of Concreat road fromBikash Biswas to Narayan Dey 1 |
Roof laid |
-
latitude : 23.1244821,23.1244821
Longitude : 88.5429511,88.5429511
file name : Image_30122021100224206.png
|
2021-12-30 10:02:24.357708 |
78 |
39060091 |
Construction of Concreat road fromBikash Biswas to Narayan Dey |
150000 |
Construction of Concreat road fromBikash Biswas to Narayan Dey 1 |
Plinth level |
-
latitude : 23.1249648,23.1249648
Longitude : 88.5427301,88.5427301
file name : Image_29122021145413755.png
|
2021-12-29 14:54:13.896063 |
79 |
39060091 |
Construction of Concreat road fromBikash Biswas to Narayan Dey |
150000 |
Construction of Concreat road fromBikash Biswas to Narayan Dey 1 |
Plinth level |
-
latitude : 23.1249785,23.1249785
Longitude : 88.54274,88.54274
file name : Image_29122021145737522.png
|
2021-12-29 14:57:37.675578 |
80 |
39060091 |
Construction of Concreat road fromBikash Biswas to Narayan Dey |
150000 |
Construction of Concreat road fromBikash Biswas to Narayan Dey 1 |
Completion of work |
-
latitude : 23.1249647,23.1249647
Longitude : 88.542756,88.542756
file name : Image_15122021130959299.png
|
2021-12-15 13:09:59.64708 |
81 |
39059381 |
Construction Concreat road fromTarani Biswas to Haouse of Kinu soren |
158058 |
Construction Concreat road fromTarani Biswas to Haouse of Kinu soren1 |
Roof laid |
-
latitude : 23.128812219947577,23.128812219947577
Longitude : 88.52849361486733,88.52849361486733
file name : Image_08012022124854387.png
|
2022-01-08 12:48:54.520592 |
82 |
39059381 |
Construction Concreat road fromTarani Biswas to Haouse of Kinu soren |
158058 |
Construction Concreat road fromTarani Biswas to Haouse of Kinu soren1 |
Plinth level |
-
latitude : 23.128864355385303,23.128864355385303
Longitude : 88.52835581637919,88.52835581637919
file name : Image_06012022131455525.png
|
2022-01-06 13:14:55.645522 |
83 |
39059381 |
Construction Concreat road fromTarani Biswas to Haouse of Kinu soren |
158058 |
Construction Concreat road fromTarani Biswas to Haouse of Kinu soren1 |
Completion of work |
-
latitude : 23.128848890773952,23.128848890773952
Longitude : 88.5283968038857,88.5283968038857
file name : Image_04012022102047550.png
|
2022-01-04 10:20:47.681277 |
84 |
39067041 |
Improvement of concreat road from house Apu Biswas towards house of Santosh Mahaldar |
103154 |
Improvement of concreat road from house Apu Biswas towards house of Santosh Mahaldar1 |
Roof laid |
-
latitude : 23.1296891,23.1295152
Longitude : 88.5405103,88.5406906
file name : Image_18062021113814511.png
|
2021-06-18 11:38:14.607011 |
85 |
39067041 |
Improvement of concreat road from house Apu Biswas towards house of Santosh Mahaldar |
103154 |
Improvement of concreat road from house Apu Biswas towards house of Santosh Mahaldar1 |
Plinth level |
-
latitude : 23.1292167,23.1296246
Longitude : 88.5408401,88.5405936
file name : Image_18062021112014527.png
|
2021-06-18 11:20:15.127047 |
86 |
39067041 |
Improvement of concreat road from house Apu Biswas towards house of Santosh Mahaldar |
103154 |
Improvement of concreat road from house Apu Biswas towards house of Santosh Mahaldar1 |
Completion of work |
-
latitude : 23.1293413,23.1293361
Longitude : 88.5408106,88.5407202
file name : Image_18062021111715248.png
|
2021-06-18 11:17:15.842444 |
87 |
39065619 |
Improvement of Concreat road from Swapan Roy towards Dilip Sengupta |
125000 |
Improvement of Concreat road from Swapan Roy towards Dilip Sengupta1 |
Roof laid |
-
latitude : 23.1217856,23.1217856
Longitude : 88.5471948,88.5471948
file name : Image_18062021122854608.png
|
2021-06-18 12:28:55.215119 |
88 |
39065619 |
Improvement of Concreat road from Swapan Roy towards Dilip Sengupta |
125000 |
Improvement of Concreat road from Swapan Roy towards Dilip Sengupta1 |
Plinth level |
-
latitude : 23.1216409,23.1217932
Longitude : 88.5474113,88.5471904
file name : Image_18062021122702978.png
|
2021-06-18 12:27:03.584546 |
89 |
39065619 |
Improvement of Concreat road from Swapan Roy towards Dilip Sengupta |
125000 |
Improvement of Concreat road from Swapan Roy towards Dilip Sengupta1 |
Completion of work |
-
latitude : 23.1216709,23.1216305
Longitude : 88.5473819,88.5474297
file name : Image_18062021122434327.png
|
2021-06-18 12:24:34.937622 |
90 |
39066526 |
Improvement of BFS road from Madhu Singharoy towards house Baban Mukherjee |
150000 |
Improvement of BFS road from Madhu Singharoy towards house Baban Mukherjee1 |
Roof laid |
-
latitude : 23.130060201510787,23.130060201510787
Longitude : 88.54943932034075,88.54943932034075
file name : Image_18062021130629288.png
|
2021-06-18 13:06:29.913849 |
91 |
39066526 |
Improvement of BFS road from Madhu Singharoy towards house Baban Mukherjee |
150000 |
Improvement of BFS road from Madhu Singharoy towards house Baban Mukherjee1 |
Plinth level |
-
latitude : 23.130060201510787,23.130060201510787
Longitude : 88.54943932034075,88.54943932034075
file name : Image_18062021130428685.png
|
2021-06-18 13:04:29.302204 |
92 |
39066526 |
Improvement of BFS road from Madhu Singharoy towards house Baban Mukherjee |
150000 |
Improvement of BFS road from Madhu Singharoy towards house Baban Mukherjee1 |
Completion of work |
-
latitude : 23.130060201510787,23.130060201510787
Longitude : 88.54943932034075,88.54943932034075
file name : Image_18062021130224041.png
|
2021-06-18 13:02:24.652628 |
93 |
39067209 |
Improvement of concreat road from house of Suman Sarkar towards house of Gurudas Mondal |
129755 |
Improvement of concreat road from house of Suman Sarkar towards house of Gurudas Mondal1 |
Roof laid |
-
latitude : 23.13786840531975,23.137893928214908
Longitude : 88.54947502724826,88.54948391206563
file name : Image_18062021115851186.png
|
2021-06-18 11:58:51.326629 |
94 |
39067209 |
Improvement of concreat road from house of Suman Sarkar towards house of Gurudas Mondal |
129755 |
Improvement of concreat road from house of Suman Sarkar towards house of Gurudas Mondal1 |
Plinth level |
-
latitude : 23.13793931622058,23.137913709506392
Longitude : 88.54938752017915,88.54938961565495
file name : Image_18062021115631456.png
|
2021-06-18 11:56:31.575488 |
95 |
39067209 |
Improvement of concreat road from house of Suman Sarkar towards house of Gurudas Mondal |
129755 |
Improvement of concreat road from house of Suman Sarkar towards house of Gurudas Mondal1 |
Completion of work |
-
latitude : 23.137948787771165,23.137912242673337
Longitude : 88.54930881410837,88.54940009303391
file name : Image_18062021115350828.png
|
2021-06-18 11:53:50.92243 |
96 |
39071017 |
Construction of Drain from house of Sambhu Bhattyacharya twords Dilip Roy |
300000 |
Construction of Drain from house of Sambhu Bhattyacharya twords Dilip Roy1 |
Plinth level |
-
latitude : 23.1241096,23.1241096
Longitude : 88.5500718,88.5500718
file name : Image_31122021141030868.png
|
2021-12-31 14:10:31.005943 |
97 |
39071017 |
Construction of Drain from house of Sambhu Bhattyacharya twords Dilip Roy |
300000 |
Construction of Drain from house of Sambhu Bhattyacharya twords Dilip Roy1 |
Plinth level |
-
latitude : 23.123941,23.123941
Longitude : 88.5495287,88.5495287
file name : Image_28122021130929962.png
|
2021-12-28 13:09:30.086464 |
98 |
39071017 |
Construction of Drain from house of Sambhu Bhattyacharya twords Dilip Roy |
300000 |
Construction of Drain from house of Sambhu Bhattyacharya twords Dilip Roy1 |
Completion of work |
-
latitude : 23.1237451,23.1237451
Longitude : 88.5493548,88.5493548
file name : Image_17122021121430963.png
|
2021-12-17 12:14:31.097168 |
99 |
39072613 |
Construction of Drain from house of Bishnu pada Das towards Prodip Chakraborty |
300000 |
Construction of Drain from house of Bishnu pada Das towards Prodip Chakraborty1 |
Roof laid |
-
latitude : 23.133712825365365,23.133712825365365
Longitude : 88.55017273686826,88.55017273686826
file name : Image_29122021142309663.png
|
2021-12-29 14:23:09.790577 |
100 |
39072613 |
Construction of Drain from house of Bishnu pada Das towards Prodip Chakraborty |
300000 |
Construction of Drain from house of Bishnu pada Das towards Prodip Chakraborty1 |
Plinth level |
-
latitude : 23.133505,23.133505
Longitude : 88.5500587,88.5500587
file name : Image_27122021132437806.png
|
2021-12-27 13:24:37.923561 |
101 |
39072613 |
Construction of Drain from house of Bishnu pada Das towards Prodip Chakraborty |
300000 |
Construction of Drain from house of Bishnu pada Das towards Prodip Chakraborty1 |
Completion of work |
-
latitude : 23.1335951,23.1336272
Longitude : 88.5497727,88.5497794
file name : Image_15122021131841962.png
|
2021-12-15 13:18:42.098043 |
102 |
39062991 |
Improvement of BFS road from Sachin Das towards Bakul Talukder |
175000 |
Improvement of BFS road from Sachin Das towards Bakul Talukder1 |
Roof laid |
-
latitude : 23.1248583,23.1248583
Longitude : 88.5448043,88.5448043
file name : Image_11012022151059791.png
|
2022-01-11 15:10:59.919651 |
103 |
39062991 |
Improvement of BFS road from Sachin Das towards Bakul Talukder |
175000 |
Improvement of BFS road from Sachin Das towards Bakul Talukder1 |
Plinth level |
-
latitude : 23.124885,23.124885
Longitude : 88.5452651,88.5452651
file name : Image_05012022154012185.png
|
2022-01-05 15:40:12.310741 |
104 |
39062991 |
Improvement of BFS road from Sachin Das towards Bakul Talukder |
175000 |
Improvement of BFS road from Sachin Das towards Bakul Talukder1 |
Completion of work |
-
latitude : 23.1219496,23.1219496
Longitude : 88.5452337,88.5452337
file name : Image_20122021152610721.png
|
2021-12-20 15:26:10.875574 |
105 |
39062991 |
Improvement of BFS road from Sachin Das towards Bakul Talukder |
175000 |
Improvement of BFS road from Sachin Das towards Bakul Talukder1 |
Completion of work |
-
latitude : 23.12466422561556,23.12466422561556
Longitude : 88.54573510587215,88.54573510587215
file name : Image_20122021152348971.png
|
2021-12-20 15:23:49.107341 |
106 |
39066274 |
Improvement of Concreat roadKalipada Das towards house Sukumar Das |
145970 |
Improvement of Concreat roadKalipada Das towards house Sukumar Das1 |
Roof laid |
-
latitude : 23.137614601291716,23.137614601291716
Longitude : 88.5397475771606,88.5397475771606
file name : Image_08012022124014378.png
|
2022-01-08 12:40:14.510925 |
107 |
39066274 |
Improvement of Concreat roadKalipada Das towards house Sukumar Das |
145970 |
Improvement of Concreat roadKalipada Das towards house Sukumar Das1 |
Plinth level |
-
latitude : 23.137615732848644,23.137615732848644
Longitude : 88.54014496318996,88.54014496318996
file name : Image_07012022134907889.png
|
2022-01-07 13:49:08.02699 |
108 |
39066274 |
Improvement of Concreat roadKalipada Das towards house Sukumar Das |
145970 |
Improvement of Concreat roadKalipada Das towards house Sukumar Das1 |
Completion of work |
-
latitude : 23.13764481805265,23.13764481805265
Longitude : 88.5398168116808,88.5398168116808
file name : Image_04012022103202375.png
|
2022-01-04 10:32:02.500875 |
109 |
39060335 |
Construction of Concreat road from Gopal Paul to Dhanesh Bhowmick |
203422 |
Construction of Concreat road from Gopal Paul to Dhanesh Bhowmick1 |
Roof laid |
-
latitude : 23.1199494,23.1199494
Longitude : 88.5404898,88.5404898
file name : Image_04012022092839977.png
|
2022-01-04 09:28:40.12458 |
110 |
39060335 |
Construction of Concreat road from Gopal Paul to Dhanesh Bhowmick |
203422 |
Construction of Concreat road from Gopal Paul to Dhanesh Bhowmick1 |
Plinth level |
-
latitude : 23.1203423,23.1203423
Longitude : 88.5409597,88.5409597
file name : Image_31122021130010462.png
|
2021-12-31 13:00:10.627991 |
111 |
39060335 |
Construction of Concreat road from Gopal Paul to Dhanesh Bhowmick |
203422 |
Construction of Concreat road from Gopal Paul to Dhanesh Bhowmick1 |
Completion of work |
-
latitude : 23.120083683170378,23.120083683170378
Longitude : 88.54182478040457,88.54182478040457
file name : Image_20122021145616688.png
|
2021-12-20 14:56:16.830791 |
112 |
39059408 |
Construction Concreat road fromPWD road to Haouse of Satyaen Saha and Sankar Biswas |
349873 |
Construction Concreat road fromPWD road to Haouse of Satyaen Saha and Sankar Biswas 1 |
Roof laid |
-
latitude : 23.1287746,23.1287746
Longitude : 88.5358851,88.5358851
file name : Image_11012022142635234.png
|
2022-01-11 14:26:35.395166 |
113 |
39059408 |
Construction Concreat road fromPWD road to Haouse of Satyaen Saha and Sankar Biswas |
349873 |
Construction Concreat road fromPWD road to Haouse of Satyaen Saha and Sankar Biswas 1 |
Completion of work |
-
latitude : 23.1287743,23.1287743
Longitude : 88.5358857,88.5358857
file name : Image_10012022140203974.png
|
2022-01-10 14:02:04.087966 |
114 |
39059408 |
Construction Concreat road fromPWD road to Haouse of Satyaen Saha and Sankar Biswas |
349873 |
Construction Concreat road fromPWD road to Haouse of Satyaen Saha and Sankar Biswas 1 |
Completion of work |
-
latitude : 23.12891397625208,23.128920807503164
Longitude : 88.53653990663588,88.53654476813972
file name : Image_22122021133847221.png
|
2021-12-22 13:38:47.348548 |
115 |
57208657 |
CONSTRUCTION OF CONCRETE ROAD FROM PUCCA ROAD TOWARDS H/O SUNIL MONDAL AT SANSAD NO VII |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM PUCCA ROAD TOWARDS H/O SUNIL MONDAL AT SANSAD NO VII1 |
Completion of work |
-
latitude : 23.125216090120375,23.125227531418204
Longitude : 88.53216581046581,88.53217226453125
file name : Image_05042023124311197.png
|
2023-04-05 12:43:11.307675 |
116 |
57333594 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O BADAL PAUL TOWARDS H/O NIRANJAN DUTTA AT SANSAD NO XV |
80000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O BADAL PAUL TOWARDS H/O NIRANJAN DUTTA AT SANSAD NO XV1 |
Roof laid |
-
latitude : 23.1318354,23.1318354
Longitude : 88.5502686,88.5502686
file name : Image_05042023140556622.png
|
2023-04-05 14:05:56.717715 |
117 |
57333594 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O BADAL PAUL TOWARDS H/O NIRANJAN DUTTA AT SANSAD NO XV |
80000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O BADAL PAUL TOWARDS H/O NIRANJAN DUTTA AT SANSAD NO XV1 |
Plinth level |
-
latitude : 23.1317616,23.1317616
Longitude : 88.5502528,88.5502528
file name : Image_04042023124718522.png
|
2023-04-04 12:47:18.612695 |
118 |
57333594 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O BADAL PAUL TOWARDS H/O NIRANJAN DUTTA AT SANSAD NO XV |
80000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O BADAL PAUL TOWARDS H/O NIRANJAN DUTTA AT SANSAD NO XV1 |
Completion of work |
-
latitude : 23.1318346,23.1318346
Longitude : 88.5502757,88.5502757
file name : Image_23032023165551507.png
|
2023-03-23 16:55:51.598662 |
119 |
57818300 |
CONSTRUCTION OF PUCCA DRAIN WITH SOAKPIT FROM H/O APURBA CHAKRABORTY TOWARDS H/F NARAYAN DHAR XIX |
350000 |
CONSTRUCTION OF PUCCA DRAIN WITH SOAKPIT FROM H/O APURBA CHAKRABORTY TOWARDS H/F NARAYAN DHAR XIX1 |
Completion of work |
-
latitude : 23.1322804,23.1322804
Longitude : 88.5485215,88.5485215
file name : Image_31032023132435710.png
|
2023-03-31 13:24:35.826348 |
120 |
57199547 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O MADHUSUDAN BISWAS TOWARDS H/O SUJIT BISWAS AT SANSAD NO VII |
70000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O MADHUSUDAN BISWAS TOWARDS H/O SUJIT BISWAS AT SANSAD NO VII1 |
Roof laid |
-
latitude : 23.125527687370777,23.125527687370777
Longitude : 88.53220554068685,88.53220554068685
file name : Image_14042023091330210.png
|
2023-04-14 09:13:30.290444 |
121 |
57199547 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O MADHUSUDAN BISWAS TOWARDS H/O SUJIT BISWAS AT SANSAD NO VII |
70000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O MADHUSUDAN BISWAS TOWARDS H/O SUJIT BISWAS AT SANSAD NO VII1 |
Plinth level |
-
latitude : 23.1255774339661,23.1255774339661
Longitude : 88.5322186164558,88.5322186164558
file name : Image_10042023133216915.png
|
2023-04-10 13:32:17.040278 |
122 |
57199547 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O MADHUSUDAN BISWAS TOWARDS H/O SUJIT BISWAS AT SANSAD NO VII |
70000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O MADHUSUDAN BISWAS TOWARDS H/O SUJIT BISWAS AT SANSAD NO VII1 |
Completion of work |
-
latitude : 23.125599729828537,23.125599729828537
Longitude : 88.532176874578,88.532176874578
file name : Image_05042023123923865.png
|
2023-04-05 12:39:23.990997 |
123 |
57199547 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O MADHUSUDAN BISWAS TOWARDS H/O SUJIT BISWAS AT SANSAD NO VII |
70000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O MADHUSUDAN BISWAS TOWARDS H/O SUJIT BISWAS AT SANSAD NO VII1 |
Completion of work |
-
latitude : 23.125602160580456,23.125602160580456
Longitude : 88.53219288401306,88.53219288401306
file name : Image_05042023124040288.png
|
2023-04-05 12:40:40.40893 |
124 |
67287580 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O ANANDA SARKAR TOWARDS H/O BARUN RAY AT NATUNGOPALPUR |
161441 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O ANANDA SARKAR TOWARDS H/O BARUN RAY AT NATUNGOPALPUR 1 |
Roof laid |
-
latitude : 23.1334385,23.1334385
Longitude : 88.5494488,88.5494488
file name : Image_18042023082224032.png
|
2023-04-18 08:22:24.12482 |
125 |
67287580 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O ANANDA SARKAR TOWARDS H/O BARUN RAY AT NATUNGOPALPUR |
161441 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O ANANDA SARKAR TOWARDS H/O BARUN RAY AT NATUNGOPALPUR 1 |
Plinth level |
-
latitude : 23.133191,23.133191
Longitude : 88.5494258,88.5494258
file name : Image_14042023103928500.png
|
2023-04-14 10:39:28.600808 |
126 |
67287580 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O ANANDA SARKAR TOWARDS H/O BARUN RAY AT NATUNGOPALPUR |
161441 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O ANANDA SARKAR TOWARDS H/O BARUN RAY AT NATUNGOPALPUR 1 |
Completion of work |
-
latitude : 23.1335331,23.1335331
Longitude : 88.5494305,88.5494305
file name : Image_12042023094916379.png
|
2023-04-12 09:49:16.491609 |
127 |
39073966 |
Improvement of Drain from house of Arup krishna Chowdhary towards Sunil Ghosh |
300000 |
Improvement of Drain from house of Arup krishna Chowdhary towards Sunil Ghosh1 |
Roof laid |
-
latitude : 23.1254271,23.1254271
Longitude : 88.5449151,88.5449151
file name : Image_09102021111006125.png
|
2021-10-09 11:10:06.224467 |
128 |
39073966 |
Improvement of Drain from house of Arup krishna Chowdhary towards Sunil Ghosh |
300000 |
Improvement of Drain from house of Arup krishna Chowdhary towards Sunil Ghosh1 |
Plinth level |
-
latitude : 23.1254505,23.1254505
Longitude : 88.5448975,88.5448975
file name : Image_25082021135133580.png
|
2021-08-25 13:51:33.704919 |
129 |
39073966 |
Improvement of Drain from house of Arup krishna Chowdhary towards Sunil Ghosh |
300000 |
Improvement of Drain from house of Arup krishna Chowdhary towards Sunil Ghosh1 |
Completion of work |
-
latitude : 23.1248382,23.1248382
Longitude : 88.5448643,88.5448643
file name : Image_25082021085106909.png
|
2021-08-25 08:51:07.029208 |
130 |
39073966 |
Improvement of Drain from house of Arup krishna Chowdhary towards Sunil Ghosh |
300000 |
Improvement of Drain from house of Arup krishna Chowdhary towards Sunil Ghosh1 |
Completion of work |
-
latitude : 23.1249029,23.1249029
Longitude : 88.5448636,88.5448636
file name : Image_12082021121042479.png
|
2021-08-12 12:10:42.582467 |
131 |
39073966 |
Improvement of Drain from house of Arup krishna Chowdhary towards Sunil Ghosh |
300000 |
Improvement of Drain from house of Arup krishna Chowdhary towards Sunil Ghosh1 |
Completion of work |
-
latitude : 23.124533467926085,23.1245594099164,23.1245594099164
Longitude : 88.54477286338806,88.54477252811193,88.54477252811193
file name : Image_06082021101313523.png
|
2021-08-06 10:13:13.626095 |
132 |
48402157 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O BHABESH DEY SARKAR TOWARDS H/O PRADIP GHOSH |
280000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O BHABESH DEY SARKAR TOWARDS H/O PRADIP GHOSH1 |
Roof laid |
-
latitude : 23.125281971879303,23.1252901
Longitude : 88.54680815711617,88.5469749
file name : Image_11042022142749703.png
|
2022-04-11 14:27:49.837318 |
133 |
48402157 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O BHABESH DEY SARKAR TOWARDS H/O PRADIP GHOSH |
280000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O BHABESH DEY SARKAR TOWARDS H/O PRADIP GHOSH1 |
Plinth level |
-
latitude : 23.1234013,23.1245909
Longitude : 88.5465532,88.546604
file name : Image_06042022125815808.png
|
2022-04-06 12:58:16.020641 |
134 |
48402157 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O BHABESH DEY SARKAR TOWARDS H/O PRADIP GHOSH |
280000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O BHABESH DEY SARKAR TOWARDS H/O PRADIP GHOSH1 |
Completion of work |
-
latitude : 23.1253662,23.1253662
Longitude : 88.5467198,88.5467198
file name : Image_19032022101355187.png
|
2022-03-19 10:13:55.319374 |
135 |
48401166 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O KANUPRIYA SAHA TOWARDS H/O BIKRAM DAS |
280000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O KANUPRIYA SAHA TOWARDS H/O BIKRAM DAS1 |
Roof laid |
-
latitude : 23.1265767,23.1265767
Longitude : 88.5489882,88.5489882
file name : Image_07042022144616824.png
|
2022-04-07 14:46:16.963408 |
136 |
48401166 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O KANUPRIYA SAHA TOWARDS H/O BIKRAM DAS |
280000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O KANUPRIYA SAHA TOWARDS H/O BIKRAM DAS1 |
Plinth level |
-
latitude : 23.1262931,23.1262931
Longitude : 88.5488414,88.5488414
file name : Image_04042022142253068.png
|
2022-04-04 14:22:53.182658 |
137 |
48401166 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O KANUPRIYA SAHA TOWARDS H/O BIKRAM DAS |
280000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O KANUPRIYA SAHA TOWARDS H/O BIKRAM DAS1 |
Completion of work |
-
latitude : 23.1261619,23.1261621
Longitude : 88.5487224,88.5487304
file name : Image_20032022103356507.png
|
2022-03-20 10:33:56.627863 |
138 |
48255264 |
CONSTRUCTION OF PUCCA DRAIN FROM 2 NO GSF PRY SCHOOL TOWARDS H/O DAKSHNIYAN CLUB |
280000 |
CONSTRUCTION OF PUCCA DRAIN FROM 2 NO GSF PRY SCHOOL TOWARDS H/O DAKSHNIYAN CLUB1 |
Roof laid |
-
latitude : 23.120873090811074,23.1205018
Longitude : 88.54611841030419,88.5459521
file name : Image_11042022142006559.png
|
2022-04-11 14:20:06.792107 |
139 |
48255264 |
CONSTRUCTION OF PUCCA DRAIN FROM 2 NO GSF PRY SCHOOL TOWARDS H/O DAKSHNIYAN CLUB |
280000 |
CONSTRUCTION OF PUCCA DRAIN FROM 2 NO GSF PRY SCHOOL TOWARDS H/O DAKSHNIYAN CLUB1 |
Plinth level |
-
latitude : 23.1205009,23.1205009
Longitude : 88.5459515,88.5459515
file name : Image_06042022125220735.png
|
2022-04-06 12:52:20.926225 |
140 |
48255264 |
CONSTRUCTION OF PUCCA DRAIN FROM 2 NO GSF PRY SCHOOL TOWARDS H/O DAKSHNIYAN CLUB |
280000 |
CONSTRUCTION OF PUCCA DRAIN FROM 2 NO GSF PRY SCHOOL TOWARDS H/O DAKSHNIYAN CLUB1 |
Completion of work |
-
latitude : 23.1204968,23.1204968
Longitude : 88.5459526,88.5459526
file name : Image_19032022102438441.png
|
2022-03-19 10:24:38.593741 |
141 |
48249157 |
CONSTRUCTION OF PUCCA DRAIN FROM SWARNALATA SISHU UDDAN TOWARDS H/O JOYDEB DUTTA |
350000 |
CONSTRUCTION OF PUCCA DRAIN FROM SWARNALATA SISHU UDDAN TOWARDS H/O JOYDEB DUTTA1 |
Roof laid |
-
latitude : 23.1290572,23.1290572
Longitude : 88.5430337,88.5430337
file name : Image_05062023162404207.png
|
2023-06-05 16:24:04.260147 |
142 |
48249157 |
CONSTRUCTION OF PUCCA DRAIN FROM SWARNALATA SISHU UDDAN TOWARDS H/O JOYDEB DUTTA |
350000 |
CONSTRUCTION OF PUCCA DRAIN FROM SWARNALATA SISHU UDDAN TOWARDS H/O JOYDEB DUTTA1 |
Plinth level |
-
latitude : 23.1290958,23.1290958,23.1288325
Longitude : 88.5439943,88.5439943,88.5430291
file name : Image_21032023162120695.png
|
2023-03-21 16:21:20.812759 |
143 |
48249157 |
CONSTRUCTION OF PUCCA DRAIN FROM SWARNALATA SISHU UDDAN TOWARDS H/O JOYDEB DUTTA |
350000 |
CONSTRUCTION OF PUCCA DRAIN FROM SWARNALATA SISHU UDDAN TOWARDS H/O JOYDEB DUTTA1 |
Completion of work |
-
latitude : 23.1269592,23.1269592
Longitude : 88.5432467,88.5432467
file name : Image_06112022143616508.png
|
2022-11-06 14:36:16.588827 |
144 |
57796136 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O SUJIT BOSE TOWARDS HOUSE OF PRANGOPAL GUHANIOGI AT XII |
350000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O SUJIT BOSE TOWARDS HOUSE OF PRANGOPAL GUHANIOGI AT XII1 |
Roof laid |
-
latitude : 23.1234115,23.1234115,23.1234115
Longitude : 88.544633,88.544633,88.544633
file name : Image_13062023141606959.png
|
2023-06-13 14:16:07.042426 |
145 |
57796136 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O SUJIT BOSE TOWARDS HOUSE OF PRANGOPAL GUHANIOGI AT XII |
350000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O SUJIT BOSE TOWARDS HOUSE OF PRANGOPAL GUHANIOGI AT XII1 |
Plinth level |
-
latitude : 23.123418507166207,23.123418507166207
Longitude : 88.54448796249926,88.54448796249926
file name : Image_11052023122424497.png
|
2023-05-11 12:24:24.599105 |
146 |
57796136 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O SUJIT BOSE TOWARDS HOUSE OF PRANGOPAL GUHANIOGI AT XII |
350000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O SUJIT BOSE TOWARDS HOUSE OF PRANGOPAL GUHANIOGI AT XII1 |
Completion of work |
-
latitude : 23.1239166,23.1239166
Longitude : 88.5445901,88.5445901
file name : Image_23032023142652179.png
|
2023-03-23 14:26:52.269168 |
147 |
69496769 |
CONSTRUCTION OF PCC ROAD FROM H/O ANIRBAN DEY TOWARDS H/O MISTI BHATTYACHARYA AT PRITINAGAR XVI ,35 |
144775 |
CONSTRUCTION OF PCC ROAD FROM H/O ANIRBAN DEY TOWARDS H/O MISTI BHATTYACHARYA AT PRITINAGAR XVI ,351 |
Plinth level |
-
latitude : 23.1274997,23.1274997
Longitude : 88.5489975,88.5489975
file name : Image_28062023140823598.png
|
2023-06-28 14:08:23.44852 |
148 |
69496769 |
CONSTRUCTION OF PCC ROAD FROM H/O ANIRBAN DEY TOWARDS H/O MISTI BHATTYACHARYA AT PRITINAGAR XVI ,35 |
144775 |
CONSTRUCTION OF PCC ROAD FROM H/O ANIRBAN DEY TOWARDS H/O MISTI BHATTYACHARYA AT PRITINAGAR XVI ,351 |
Plinth level |
-
latitude : 23.1274885,23.1274885
Longitude : 88.5490778,88.5490778
file name : Image_26062023120152461.png
|
2023-06-26 12:01:52.562991 |
149 |
69496769 |
CONSTRUCTION OF PCC ROAD FROM H/O ANIRBAN DEY TOWARDS H/O MISTI BHATTYACHARYA AT PRITINAGAR XVI ,35 |
144775 |
CONSTRUCTION OF PCC ROAD FROM H/O ANIRBAN DEY TOWARDS H/O MISTI BHATTYACHARYA AT PRITINAGAR XVI ,351 |
Completion of work |
-
latitude : 23.127491,23.127491
Longitude : 88.5489976,88.5489976
file name : Image_13062023122046083.png
|
2023-06-13 12:20:46.18257 |
150 |
69493125 |
CONSTRUCTION OF PCC ROAD FROM H/O PRADIP PAL TOWARDS H/O DULAL PAL AT PRITINAGARSANSAD XIII AAP29 |
220000 |
CONSTRUCTION OF PCC ROAD FROM H/O PRADIP PAL TOWARDS H/O DULAL PAL AT PRITINAGARSANSAD XIII AAP291 |
Roof laid |
-
latitude : 23.1196223,23.1196223
Longitude : 88.5458483,88.5458483
file name : Image_05072023090808769.png
|
2023-07-05 09:08:08.862119 |
151 |
69493125 |
CONSTRUCTION OF PCC ROAD FROM H/O PRADIP PAL TOWARDS H/O DULAL PAL AT PRITINAGARSANSAD XIII AAP29 |
220000 |
CONSTRUCTION OF PCC ROAD FROM H/O PRADIP PAL TOWARDS H/O DULAL PAL AT PRITINAGARSANSAD XIII AAP291 |
Plinth level |
-
latitude : 23.1193965,23.1193965,23.1193965
Longitude : 88.5459152,88.5459152,88.5459152
file name : Image_30062023124709426.png
|
2023-06-30 12:47:09.523962 |
152 |
69493125 |
CONSTRUCTION OF PCC ROAD FROM H/O PRADIP PAL TOWARDS H/O DULAL PAL AT PRITINAGARSANSAD XIII AAP29 |
220000 |
CONSTRUCTION OF PCC ROAD FROM H/O PRADIP PAL TOWARDS H/O DULAL PAL AT PRITINAGARSANSAD XIII AAP291 |
Completion of work |
-
latitude : 23.1195112,23.1195112
Longitude : 88.5458635,88.5458635
file name : Image_12062023115319118.png
|
2023-06-12 11:53:19.225855 |
153 |
86593887 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
300000 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
|
-
latitude : 23.1315974
Longitude : 88.5433644
file name : Image_07082023153643705.png
|
2023-08-07 15:36:43.894678 |
154 |
57222159 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O NRIPEN MAJUMDER TOWARDS H/O SHYAMAL OJHA AT SANSAD NO XI |
150000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O NRIPEN MAJUMDER TOWARDS H/O SHYAMAL OJHA AT SANSAD NO XI1 |
Roof laid |
-
latitude : 23.1209934,23.1209934,23.1209934
Longitude : 88.5393736,88.5393736,88.5393736
file name : Image_06072023092315993.png
|
2023-07-06 09:23:16.080621 |
155 |
57222159 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O NRIPEN MAJUMDER TOWARDS H/O SHYAMAL OJHA AT SANSAD NO XI |
150000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O NRIPEN MAJUMDER TOWARDS H/O SHYAMAL OJHA AT SANSAD NO XI1 |
Plinth level |
-
latitude : 23.121346,23.121346
Longitude : 88.5389031,88.5389031
file name : Image_04072023123831960.png
|
2023-07-04 12:38:32.06719 |
156 |
57222159 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O NRIPEN MAJUMDER TOWARDS H/O SHYAMAL OJHA AT SANSAD NO XI |
150000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O NRIPEN MAJUMDER TOWARDS H/O SHYAMAL OJHA AT SANSAD NO XI1 |
Completion of work |
-
latitude : 23.1209935,23.1209935
Longitude : 88.5393885,88.5393885
file name : Image_14062023101125632.png
|
2023-06-14 10:11:26.05874 |
157 |
57816731 |
CONSTRUCTION COMMUNITY TOILET ON LAND OF BHATRI SANGHA AT SANSAD NO XXIV |
350000 |
CONSTRUCTION COMMUNITY TOILET ON LAND OF BHATRI SANGHA AT SANSAD NO XXIV1 |
Roof laid |
-
latitude : 23.134033139795065
Longitude : 88.5456757619977
file name : Image_04092023124440872.png
|
2023-09-04 12:44:40.975157 |
158 |
57816731 |
CONSTRUCTION COMMUNITY TOILET ON LAND OF BHATRI SANGHA AT SANSAD NO XXIV |
350000 |
CONSTRUCTION COMMUNITY TOILET ON LAND OF BHATRI SANGHA AT SANSAD NO XXIV1 |
Plinth level |
-
latitude : 23.1337246
Longitude : 88.5456682
file name : Image_01072023160912476.png
|
2023-07-01 16:09:12.574647 |
159 |
57816731 |
CONSTRUCTION COMMUNITY TOILET ON LAND OF BHATRI SANGHA AT SANSAD NO XXIV |
350000 |
CONSTRUCTION COMMUNITY TOILET ON LAND OF BHATRI SANGHA AT SANSAD NO XXIV1 |
Completion of work |
-
latitude : 23.1341237
Longitude : 88.5455134
file name : Image_12042023092944840.png
|
2023-04-12 09:29:44.948273 |
160 |
57351290 |
CONSTRUCTION OF BT ROAD FROM H/O SUBOD NATH TOWARDS H/O NIMAI BISWAS AT SANSAD NO XXI |
190000 |
CONSTRUCTION OF BT ROAD FROM H/O SUBOD NATH TOWARDS H/O NIMAI BISWAS AT SANSAD NO XXI1 |
Roof laid |
-
latitude : 23.131529046222568,23.131553479470313
Longitude : 88.5436394624412,88.54356293566525
file name : Image_21112023141800133.png
|
2023-11-21 14:18:00.187343 |
161 |
57351290 |
CONSTRUCTION OF BT ROAD FROM H/O SUBOD NATH TOWARDS H/O NIMAI BISWAS AT SANSAD NO XXI |
190000 |
CONSTRUCTION OF BT ROAD FROM H/O SUBOD NATH TOWARDS H/O NIMAI BISWAS AT SANSAD NO XXI1 |
Plinth level |
-
latitude : 23.1315657,23.1315657
Longitude : 88.5438667,88.5438667
file name : Image_30102023143805402.png
|
2023-10-30 14:38:05.498566 |
162 |
57351290 |
CONSTRUCTION OF BT ROAD FROM H/O SUBOD NATH TOWARDS H/O NIMAI BISWAS AT SANSAD NO XXI |
190000 |
CONSTRUCTION OF BT ROAD FROM H/O SUBOD NATH TOWARDS H/O NIMAI BISWAS AT SANSAD NO XXI1 |
Completion of work |
-
latitude : 23.131666,23.131666
Longitude : 88.5436056,88.5436056
file name : Image_30092023134958540.png
|
2023-09-30 13:49:58.629892 |
163 |
80977728 |
Creation of drainage channel for management of grey water |
260000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.1236602
Longitude : 88.546602
file name : Image_11102023115835591.png
|
2023-10-11 11:58:35.695723 |
164 |
80977728 |
Creation of drainage channel for management of grey water |
260000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.1228575
Longitude : 88.5464326
file name : Image_09102023093510958.png
|
2023-10-09 09:35:11.04901 |
165 |
80977728 |
Creation of drainage channel for management of grey water |
260000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.1234224
Longitude : 88.5466025
file name : Image_11092023092022508.png
|
2023-09-11 09:20:22.59428 |
166 |
57211765 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O HARIMOHAN DEY TOWARDS H/O GOBINDA DEY AT SANSAD NO -X |
70000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O HARIMOHAN DEY TOWARDS H/O GOBINDA DEY AT SANSAD NO -X1 |
Roof laid |
-
latitude : 23.1239009,23.1239009
Longitude : 88.542195,88.542195
file name : Image_13042023090736479.png
|
2023-04-13 09:07:36.569308 |
167 |
57211765 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O HARIMOHAN DEY TOWARDS H/O GOBINDA DEY AT SANSAD NO -X |
70000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O HARIMOHAN DEY TOWARDS H/O GOBINDA DEY AT SANSAD NO -X1 |
Plinth level |
-
latitude : 23.1240156,23.1240156
Longitude : 88.5425179,88.5425179
file name : Image_07042023173729134.png
|
2023-04-07 17:37:29.23794 |
168 |
57211765 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O HARIMOHAN DEY TOWARDS H/O GOBINDA DEY AT SANSAD NO -X |
70000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O HARIMOHAN DEY TOWARDS H/O GOBINDA DEY AT SANSAD NO -X1 |
Completion of work |
-
latitude : 23.1239488,23.1239488
Longitude : 88.5419781,88.5419781
file name : Image_23032023144835277.png
|
2023-03-23 14:48:35.371735 |
169 |
57359782 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O FANI SARKAR TOWRDS H/O SADHAN DAS SANSAD NO XXIV |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O FANI SARKAR TOWRDS H/O SADHAN DAS SANSAD NO XXIV1 |
Roof laid |
-
latitude : 23.1318765,23.1318765
Longitude : 88.5460673,88.5460673
file name : Image_13042023085243783.png
|
2023-04-13 08:52:43.902949 |
170 |
57359782 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O FANI SARKAR TOWRDS H/O SADHAN DAS SANSAD NO XXIV |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O FANI SARKAR TOWRDS H/O SADHAN DAS SANSAD NO XXIV1 |
Plinth level |
-
latitude : 23.1318212,23.1318212
Longitude : 88.5460886,88.5460886
file name : Image_08042023173207539.png
|
2023-04-08 17:32:07.628481 |
171 |
57359782 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O FANI SARKAR TOWRDS H/O SADHAN DAS SANSAD NO XXIV |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O FANI SARKAR TOWRDS H/O SADHAN DAS SANSAD NO XXIV1 |
Completion of work |
-
latitude : 23.1318773,23.1318773
Longitude : 88.5460567,88.5460567
file name : Image_23032023142156239.png
|
2023-03-23 14:21:56.335054 |
172 |
67284781 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O KALU BISWAS TOWARDS H/O REBA GHOSH AT PARBATIPUR SANSAD-XX |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O KALU BISWAS TOWARDS H/O REBA GHOSH AT PARBATIPUR SANSAD-XX 1 |
Roof laid |
-
latitude : 23.1324492,23.1324492
Longitude : 88.5411933,88.5411933
file name : Image_13042023090001122.png
|
2023-04-13 09:00:01.232252 |
173 |
67284781 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O KALU BISWAS TOWARDS H/O REBA GHOSH AT PARBATIPUR SANSAD-XX |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O KALU BISWAS TOWARDS H/O REBA GHOSH AT PARBATIPUR SANSAD-XX 1 |
Plinth level |
-
latitude : 23.1323409,23.1323409
Longitude : 88.5404262,88.5404262
file name : Image_07042023105358769.png
|
2023-04-07 10:53:58.86058 |
174 |
67284781 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O KALU BISWAS TOWARDS H/O REBA GHOSH AT PARBATIPUR SANSAD-XX |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O KALU BISWAS TOWARDS H/O REBA GHOSH AT PARBATIPUR SANSAD-XX 1 |
Completion of work |
-
latitude : 23.1324849,23.1324849
Longitude : 88.5411448,88.5411448
file name : Image_23032023141453133.png
|
2023-03-23 14:14:53.229595 |
175 |
57821913 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O RAMSARAN BARMAN TOWARDS TANGARJOLE AT XIX |
350000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O RAMSARAN BARMAN TOWARDS TANGARJOLE AT XIX1 |
Roof laid |
-
latitude : 23.139116554521024,23.139116554521024
Longitude : 88.54240304790437,88.54240304790437
file name : Image_19012024141625074.png
|
2024-01-19 14:16:25.156631 |
176 |
57821913 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O RAMSARAN BARMAN TOWARDS TANGARJOLE AT XIX |
350000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O RAMSARAN BARMAN TOWARDS TANGARJOLE AT XIX1 |
Plinth level |
-
latitude : 23.139163702726364,23.139170156791806
Longitude : 88.54234219528735,88.54234538041055
file name : Image_08012024120156794.png
|
2024-01-08 12:01:56.911825 |
177 |
57821913 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O RAMSARAN BARMAN TOWARDS TANGARJOLE AT XIX |
350000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O RAMSARAN BARMAN TOWARDS TANGARJOLE AT XIX1 |
Completion of work |
-
latitude : 23.138988688588142,23.138988688588142
Longitude : 88.54242475703359,88.54242475703359
file name : Image_12042023100259982.png
|
2023-04-12 10:03:00.084137 |
178 |
69487722 |
CONSTRUCTION OF PCC ROAD FROM PUCCA ROAD TOWARDS H/O BASUDEB TARAFDER AT NIYAMATPUR SANSADNO IV AAP9 |
110000 |
CONSTRUCTION OF PCC ROAD FROM PUCCA ROAD TOWARDS H/O BASUDEB TARAFDER AT NIYAMATPUR SANSADNO IV AAP91 |
Roof laid |
-
latitude : 23.126688958145678,23.126688958145678
Longitude : 88.52531209588051,88.52531209588051
file name : Image_04072023172632377.png
|
2023-07-04 17:26:32.465353 |
179 |
69487722 |
CONSTRUCTION OF PCC ROAD FROM PUCCA ROAD TOWARDS H/O BASUDEB TARAFDER AT NIYAMATPUR SANSADNO IV AAP9 |
110000 |
CONSTRUCTION OF PCC ROAD FROM PUCCA ROAD TOWARDS H/O BASUDEB TARAFDER AT NIYAMATPUR SANSADNO IV AAP91 |
Plinth level |
-
latitude : 23.126685144379735,23.126685144379735
Longitude : 88.52530664764345,88.52530664764345
file name : Image_03072023115242822.png
|
2023-07-03 11:52:42.925911 |
180 |
69487722 |
CONSTRUCTION OF PCC ROAD FROM PUCCA ROAD TOWARDS H/O BASUDEB TARAFDER AT NIYAMATPUR SANSADNO IV AAP9 |
110000 |
CONSTRUCTION OF PCC ROAD FROM PUCCA ROAD TOWARDS H/O BASUDEB TARAFDER AT NIYAMATPUR SANSADNO IV AAP91 |
Completion of work |
-
latitude : 23.126731496304274,23.126731496304274
Longitude : 88.52524621412158,88.52524621412158
file name : Image_13062023134453416.png
|
2023-06-13 13:44:53.535167 |
181 |
57339647 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O MOHAN GUHA TOWARDS H/O DEBASISH GUHA AT SANSAD NO XVII |
150000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O MOHAN GUHA TOWARDS H/O DEBASISH GUHA AT SANSAD NO XVII1 |
Roof laid |
-
latitude : 23.122678,23.122678
Longitude : 88.5473895,88.5473895
file name : Image_03082023131641484.png
|
2023-08-03 13:16:41.589384 |
182 |
57339647 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O MOHAN GUHA TOWARDS H/O DEBASISH GUHA AT SANSAD NO XVII |
150000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O MOHAN GUHA TOWARDS H/O DEBASISH GUHA AT SANSAD NO XVII1 |
Plinth level |
-
latitude : 23.1225798,23.1225798
Longitude : 88.5471158,88.5471158
file name : Image_25072023151851597.png
|
2023-07-25 15:18:51.779589 |
183 |
57339647 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O MOHAN GUHA TOWARDS H/O DEBASISH GUHA AT SANSAD NO XVII |
150000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O MOHAN GUHA TOWARDS H/O DEBASISH GUHA AT SANSAD NO XVII1 |
Completion of work |
-
latitude : 23.1226772,23.1226772
Longitude : 88.5463273,88.5463273
file name : Image_13062023135701047.png
|
2023-06-13 13:57:01.141105 |
184 |
61871123 |
CONSTRUCTION OF PCC ROAD FROM H/O SUBODH BISWAS TOWARDS H/O BINAY DAS AT PARBATIPUR SANSAD NO XX |
106786 |
CONSTRUCTION OF PCC ROAD FROM H/O SUBODH BISWAS TOWARDS H/O BINAY DAS AT PARBATIPUR SANSAD NO XX1 |
Roof laid |
-
latitude : 23.13546682242304,23.13546682242304
Longitude : 88.54011420160532,88.54011420160532
file name : Image_24052022123215749.png
|
2022-05-24 12:32:15.847992 |
185 |
61871123 |
CONSTRUCTION OF PCC ROAD FROM H/O SUBODH BISWAS TOWARDS H/O BINAY DAS AT PARBATIPUR SANSAD NO XX |
106786 |
CONSTRUCTION OF PCC ROAD FROM H/O SUBODH BISWAS TOWARDS H/O BINAY DAS AT PARBATIPUR SANSAD NO XX1 |
Plinth level |
-
latitude : 23.13546108081937,23.13546108081937
Longitude : 88.54008696042001,88.54008696042001
file name : Image_24052022123040809.png
|
2022-05-24 12:30:40.885701 |
186 |
61871123 |
CONSTRUCTION OF PCC ROAD FROM H/O SUBODH BISWAS TOWARDS H/O BINAY DAS AT PARBATIPUR SANSAD NO XX |
106786 |
CONSTRUCTION OF PCC ROAD FROM H/O SUBODH BISWAS TOWARDS H/O BINAY DAS AT PARBATIPUR SANSAD NO XX1 |
Completion of work |
-
latitude : 23.135493141599,23.135493141599
Longitude : 88.54012694209814,88.54012694209814
file name : Image_24052022122758990.png
|
2022-05-24 12:27:59.06779 |
187 |
64318140 |
CONSTRUCTION OF COMMUNITY TOILET AT PRITINAGAR CO OPARATIVE GROUND AT PRITINAGAR NO XVII |
220000 |
CONSTRUCTION OF COMMUNITY TOILET AT PRITINAGAR CO OPARATIVE GROUND AT PRITINAGAR NO XVII1 |
Roof laid |
-
latitude : 23.1212774
Longitude : 88.5436921
file name : Image_15122022130022359.png
|
2022-12-15 13:00:22.456442 |
188 |
64318140 |
CONSTRUCTION OF COMMUNITY TOILET AT PRITINAGAR CO OPARATIVE GROUND AT PRITINAGAR NO XVII |
220000 |
CONSTRUCTION OF COMMUNITY TOILET AT PRITINAGAR CO OPARATIVE GROUND AT PRITINAGAR NO XVII1 |
Plinth level |
-
latitude : 23.121172282844782
Longitude : 88.54630591347814
file name : Image_22112022151157455.png
|
2022-11-22 15:11:57.535688 |
189 |
64318140 |
CONSTRUCTION OF COMMUNITY TOILET AT PRITINAGAR CO OPARATIVE GROUND AT PRITINAGAR NO XVII |
220000 |
CONSTRUCTION OF COMMUNITY TOILET AT PRITINAGAR CO OPARATIVE GROUND AT PRITINAGAR NO XVII1 |
Completion of work |
-
latitude : 23.12129746656865
Longitude : 88.54623877443373
file name : Image_18112022125222502.png
|
2022-11-18 12:52:22.582776 |
190 |
61872246 |
IMPROVEMENT OF JAGPUR PRE PRIMARY HEALTH SUB CENTRE AT JAGPUR SANSAD NO III |
225746 |
IMPROVEMENT OF JAGPUR PRE PRIMARY HEALTH SUB CENTRE AT JAGPUR SANSAD NO III1 |
Roof laid |
-
latitude : 23.124901
Longitude : 88.5291069
file name : Image_04072022121926969.png
|
2022-07-04 12:19:27.073526 |
191 |
61872246 |
IMPROVEMENT OF JAGPUR PRE PRIMARY HEALTH SUB CENTRE AT JAGPUR SANSAD NO III |
225746 |
IMPROVEMENT OF JAGPUR PRE PRIMARY HEALTH SUB CENTRE AT JAGPUR SANSAD NO III1 |
Plinth level |
-
latitude : 23.12478676903993
Longitude : 88.52912980131805
file name : Image_10052022094448724.png
|
2022-05-10 09:44:48.827789 |
192 |
61872246 |
IMPROVEMENT OF JAGPUR PRE PRIMARY HEALTH SUB CENTRE AT JAGPUR SANSAD NO III |
225746 |
IMPROVEMENT OF JAGPUR PRE PRIMARY HEALTH SUB CENTRE AT JAGPUR SANSAD NO III1 |
Completion of work |
-
latitude : 23.124849968589842
Longitude : 88.5291135404259
file name : Image_01042022124017842.png
|
2022-04-01 12:40:17.983339 |
193 |
48090056 |
IMPROVEMENT OF BT ROAD FROM H/O FANIBHUSAN SARKAR TOWARDS H/O REKHA MONDAL AT VIII |
175000 |
IMPROVEMENT OF BT ROAD FROM H/O FANIBHUSAN SARKAR TOWARDS H/O REKHA MONDAL AT VIII1 |
Roof laid |
-
latitude : 23.1259776,23.1259776
Longitude : 88.5443316,88.5443316
file name : Image_13032023132832505.png
|
2023-03-13 13:28:32.603939 |
194 |
48090056 |
IMPROVEMENT OF BT ROAD FROM H/O FANIBHUSAN SARKAR TOWARDS H/O REKHA MONDAL AT VIII |
175000 |
IMPROVEMENT OF BT ROAD FROM H/O FANIBHUSAN SARKAR TOWARDS H/O REKHA MONDAL AT VIII1 |
Plinth level |
-
latitude : 23.1258691,23.1258691
Longitude : 88.5441893,88.5441893
file name : Image_13032023131900577.png
|
2023-03-13 13:19:00.670854 |
195 |
48090056 |
IMPROVEMENT OF BT ROAD FROM H/O FANIBHUSAN SARKAR TOWARDS H/O REKHA MONDAL AT VIII |
175000 |
IMPROVEMENT OF BT ROAD FROM H/O FANIBHUSAN SARKAR TOWARDS H/O REKHA MONDAL AT VIII1 |
Completion of work |
-
latitude : 23.1258327,23.1258327
Longitude : 88.544233,88.544233
file name : Image_13032023131604340.png
|
2023-03-13 13:16:04.449823 |
196 |
39069019 |
Construction of Sajal Dhara on Land of Payradanga Dakhinayan Club |
800000 |
Construction of Sajal Dhara on Land of Payradanga Dakhinayan Club1 |
Roof laid |
-
latitude : 23.1179076153785
Longitude : 88.54469164274633
file name : Image_25042022151413087.png
|
2022-04-25 15:14:13.165703 |
197 |
39069019 |
Construction of Sajal Dhara on Land of Payradanga Dakhinayan Club |
800000 |
Construction of Sajal Dhara on Land of Payradanga Dakhinayan Club1 |
Roof laid |
-
latitude : 23.131502266041934
Longitude : 88.54348557069898
file name : Image_07042022150122680.png
|
2022-04-07 15:01:22.815112 |
198 |
39069019 |
Construction of Sajal Dhara on Land of Payradanga Dakhinayan Club |
800000 |
Construction of Sajal Dhara on Land of Payradanga Dakhinayan Club1 |
Plinth level |
-
latitude : 23.117746682837605
Longitude : 88.54550166986883
file name : Image_28032022123605902.png
|
2022-03-28 12:36:06.079839 |
199 |
39069019 |
Construction of Sajal Dhara on Land of Payradanga Dakhinayan Club |
800000 |
Construction of Sajal Dhara on Land of Payradanga Dakhinayan Club1 |
Completion of work |
-
latitude : 23.117843032814562
Longitude : 88.54549781419337
file name : Image_17022022131550207.png
|
2022-02-17 13:15:50.3288 |
200 |
39066012 |
Improvement of Concreat road from Kalachand Biswas towards Rabindra Sarkar |
120000 |
Improvement of Concreat road from Kalachand Biswas towards Rabindra Sarkar1 |
Roof laid |
-
latitude : 23.121972461231053,23.121972461231053
Longitude : 88.52392354980111,88.52392354980111
file name : Image_31032022082740428.png
|
2022-03-31 08:27:40.545326 |
201 |
39066012 |
Improvement of Concreat road from Kalachand Biswas towards Rabindra Sarkar |
120000 |
Improvement of Concreat road from Kalachand Biswas towards Rabindra Sarkar1 |
Roof laid |
-
latitude : 23.118552770465612,23.118552770465612
Longitude : 88.54046766646206,88.54046766646206
file name : Image_28032022123026866.png
|
2022-03-28 12:30:27.000662 |
202 |
39066012 |
Improvement of Concreat road from Kalachand Biswas towards Rabindra Sarkar |
120000 |
Improvement of Concreat road from Kalachand Biswas towards Rabindra Sarkar1 |
Plinth level |
-
latitude : 23.120431154966354,23.120432454161346
Longitude : 88.54860565625131,88.54861445724964
file name : Image_24032022112441204.png
|
2022-03-24 11:24:41.347975 |
203 |
39066012 |
Improvement of Concreat road from Kalachand Biswas towards Rabindra Sarkar |
120000 |
Improvement of Concreat road from Kalachand Biswas towards Rabindra Sarkar1 |
Completion of work |
-
latitude : 23.12045759987086,23.12045759987086
Longitude : 88.5484919976443,88.5484919976443
file name : Image_23032022115717337.png
|
2022-03-23 11:57:17.485133 |
204 |
96994210 |
Greywater management system |
1000000 |
Greywater management system parbatipur |
Plinth level |
-
latitude : 23.138039521872997
Longitude : 88.54254352860153
file name : Image_16052024113115495.png
|
2024-05-16 11:31:15.56536 |
205 |
96994210 |
Greywater management system |
1000000 |
Greywater management system parbatipur |
Completion of work |
-
latitude : 23.138071331195533
Longitude : 88.54254721663892
file name : Image_20042024112426687.png
|
2024-04-20 11:24:26.740367 |
206 |
96993566 |
Greywater management system |
1064833 |
Greywater management system gopalpur |
Plinth level |
-
latitude : 23.1224057
Longitude : 88.5466615
file name : Image_16052024141800060.png
|
2024-05-16 14:18:00.112583 |
207 |
96993566 |
Greywater management system |
1064833 |
Greywater management system gopalpur |
Completion of work |
-
latitude : 23.1208231
Longitude : 88.5462298
file name : Image_20042024114436636.png
|
2024-04-20 11:44:36.697823 |
208 |
67496475 |
Repairing and maintenance of roads |
200000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 23.13013656064868,23.13013656064868
Longitude : 88.51777156814933,88.51777156814933
file name : Image_31012024122430444.png
|
2024-01-31 12:24:30.501852 |
209 |
67496475 |
Repairing and maintenance of roads |
200000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 23.129620109684765,23.129620109684765
Longitude : 88.51760409772396,88.51760409772396
file name : Image_30012024125751550.png
|
2024-01-30 12:57:51.605403 |
210 |
67496475 |
Repairing and maintenance of roads |
200000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 23.13008434139192,23.13008434139192
Longitude : 88.5178803652525,88.5178803652525
file name : Image_27012024111159693.png
|
2024-01-27 11:11:59.756087 |
211 |
48176160 |
CONSTRUCTION OF BT ROAD FROM H/O BABLU CHATTERJEE TOWARDS PARBATIPUR PRYMARY SCHOOL AT SANSAD NO XXI |
270000 |
CONSTRUCTION OF BT ROAD FROM H/O BABLU CHATTERJEE TOWARDS PARBATIPUR PRYMARY SCHOOL AT SANSAD NO XXI1 |
Roof laid |
-
latitude : 23.13263101503253,23.13263101503253
Longitude : 88.54341516271234,88.54341516271234
file name : Image_13032023134410337.png
|
2023-03-13 13:44:10.436131 |
212 |
48176160 |
CONSTRUCTION OF BT ROAD FROM H/O BABLU CHATTERJEE TOWARDS PARBATIPUR PRYMARY SCHOOL AT SANSAD NO XXI |
270000 |
CONSTRUCTION OF BT ROAD FROM H/O BABLU CHATTERJEE TOWARDS PARBATIPUR PRYMARY SCHOOL AT SANSAD NO XXI1 |
Plinth level |
-
latitude : 23.1326711,23.1326711
Longitude : 88.5431003,88.5431003
file name : Image_13032023134137788.png
|
2023-03-13 13:41:37.872216 |
213 |
48176160 |
CONSTRUCTION OF BT ROAD FROM H/O BABLU CHATTERJEE TOWARDS PARBATIPUR PRYMARY SCHOOL AT SANSAD NO XXI |
270000 |
CONSTRUCTION OF BT ROAD FROM H/O BABLU CHATTERJEE TOWARDS PARBATIPUR PRYMARY SCHOOL AT SANSAD NO XXI1 |
Completion of work |
-
latitude : 23.132610814645886,23.132610814645886
Longitude : 88.5436777677387,88.5436777677387
file name : Image_28112022095901501.png
|
2022-11-28 09:59:01.590898 |
214 |
67520270 |
Construction of roads |
220000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.1297424,23.1297424
Longitude : 88.5383151,88.5383151
file name : Image_24012024144150954.png
|
2024-01-24 14:41:51.018295 |
215 |
67520270 |
Construction of roads |
220000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1297556,23.1297556
Longitude : 88.5384367,88.5384367
file name : Image_23012024113500528.png
|
2024-01-23 11:35:00.592559 |
216 |
67520270 |
Construction of roads |
220000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.1303153,23.1303153,23.130007227882743
Longitude : 88.5392431,88.5392431,88.53908725082874
file name : Image_20012024115846031.png
|
2024-01-20 11:58:46.083038 |
217 |
69498128 |
CONSTRUCTION OF PCC ROAD FROM H/O HARIPADA SARKAR TOWARDS H/O TRIPTI BISWAS AT PRITINAGAR XVIII39 |
144812 |
CONSTRUCTION OF PCC ROAD FROM H/O HARIPADA SARKAR TOWARDS H/O TRIPTI BISWAS AT PRITINAGAR XVIII391 |
Roof laid |
-
latitude : 23.1208369,23.1208369
Longitude : 88.5484496,88.5484496
file name : Image_26072023150424182.png
|
2023-07-26 15:04:24.314778 |
218 |
69498128 |
CONSTRUCTION OF PCC ROAD FROM H/O HARIPADA SARKAR TOWARDS H/O TRIPTI BISWAS AT PRITINAGAR XVIII39 |
144812 |
CONSTRUCTION OF PCC ROAD FROM H/O HARIPADA SARKAR TOWARDS H/O TRIPTI BISWAS AT PRITINAGAR XVIII391 |
Plinth level |
-
latitude : 23.1198494,23.1198494,23.120982
Longitude : 88.5487526,88.5487526,88.5487629
file name : Image_20072023135935365.png
|
2023-07-20 13:59:35.511017 |
219 |
69498128 |
CONSTRUCTION OF PCC ROAD FROM H/O HARIPADA SARKAR TOWARDS H/O TRIPTI BISWAS AT PRITINAGAR XVIII39 |
144812 |
CONSTRUCTION OF PCC ROAD FROM H/O HARIPADA SARKAR TOWARDS H/O TRIPTI BISWAS AT PRITINAGAR XVIII391 |
Completion of work |
-
latitude : 23.12046216800809,23.12046216800809
Longitude : 88.54841731488705,88.54841731488705
file name : Image_12062023130257748.png
|
2023-06-12 13:02:57.848018 |
220 |
57212540 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O RABIN BAOALI TOWARDS H/O SHAMPA SAHA AT SANSAD NO X |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O RABIN BAOALI TOWARDS H/O SHAMPA SAHA AT SANSAD NO X1 |
Roof laid |
-
latitude : 23.1209312,23.1209312
Longitude : 88.5408881,88.5408881
file name : Image_04072023153602226.png
|
2023-07-04 15:36:02.316145 |
221 |
57212540 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O RABIN BAOALI TOWARDS H/O SHAMPA SAHA AT SANSAD NO X |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O RABIN BAOALI TOWARDS H/O SHAMPA SAHA AT SANSAD NO X1 |
Plinth level |
-
latitude : 23.1209368,23.1209368
Longitude : 88.5408656,88.5408656
file name : Image_01072023122704015.png
|
2023-07-01 12:27:04.117088 |
222 |
57212540 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O RABIN BAOALI TOWARDS H/O SHAMPA SAHA AT SANSAD NO X |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O RABIN BAOALI TOWARDS H/O SHAMPA SAHA AT SANSAD NO X1 |
Completion of work |
-
latitude : 23.1208843,23.1208843
Longitude : 88.5408263,88.5408263
file name : Image_12062023124720828.png
|
2023-06-12 12:47:20.93076 |
223 |
57813624 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O ANIRBAN DEY TOWARDS HOUSE OF PANCHU GOPAL BISWAS AT XVI |
150000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O ANIRBAN DEY TOWARDS HOUSE OF PANCHU GOPAL BISWAS AT XVI1 |
Roof laid |
-
latitude : 23.127501,23.127501
Longitude : 88.549011,88.549011
file name : Image_11082023133159530.png
|
2023-08-11 13:31:59.642319 |
224 |
57813624 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O ANIRBAN DEY TOWARDS HOUSE OF PANCHU GOPAL BISWAS AT XVI |
150000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O ANIRBAN DEY TOWARDS HOUSE OF PANCHU GOPAL BISWAS AT XVI1 |
Plinth level |
-
latitude : 23.1274946,23.1274946
Longitude : 88.5490143,88.5490143
file name : Image_05082023164042115.png
|
2023-08-05 16:40:42.220548 |
225 |
57813624 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O ANIRBAN DEY TOWARDS HOUSE OF PANCHU GOPAL BISWAS AT XVI |
150000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O ANIRBAN DEY TOWARDS HOUSE OF PANCHU GOPAL BISWAS AT XVI1 |
Completion of work |
-
latitude : 23.1275175,23.1275175
Longitude : 88.5490146,88.5490146
file name : Image_23032023170109888.png
|
2023-03-23 17:01:09.999791 |
226 |
67287419 |
CONSTRUCTION OF BT ROAD FROM H/O SANKAR DUTTA TOWARDS H/O AMIT SARKAR AT PARBATIPUR |
170089 |
CONSTRUCTION OF BT ROAD FROM H/O SANKAR DUTTA TOWARDS H/O AMIT SARKAR AT PARBATIPUR1 |
Roof laid |
-
latitude : 23.1241421,23.1241421
Longitude : 88.5424667,88.5424667
file name : Image_18052023090641591.png
|
2023-05-18 09:06:41.722571 |
227 |
67287419 |
CONSTRUCTION OF BT ROAD FROM H/O SANKAR DUTTA TOWARDS H/O AMIT SARKAR AT PARBATIPUR |
170089 |
CONSTRUCTION OF BT ROAD FROM H/O SANKAR DUTTA TOWARDS H/O AMIT SARKAR AT PARBATIPUR1 |
Plinth level |
-
latitude : 23.124043713323772,23.124043713323772
Longitude : 88.54345648549497,88.54345648549497
file name : Image_04052023114035299.png
|
2023-05-04 11:40:35.408712 |
228 |
67287419 |
CONSTRUCTION OF BT ROAD FROM H/O SANKAR DUTTA TOWARDS H/O AMIT SARKAR AT PARBATIPUR |
170089 |
CONSTRUCTION OF BT ROAD FROM H/O SANKAR DUTTA TOWARDS H/O AMIT SARKAR AT PARBATIPUR1 |
Completion of work |
-
latitude : 23.1241358,23.1241358
Longitude : 88.5427855,88.5427855
file name : Image_05042023130646231.png
|
2023-04-05 13:06:46.334487 |
229 |
67287711 |
IMPROVEMENT OF BT ROAD FROM H/O SUMOTISH BAGCHI TOWARDS H/O SARAJ DAS AT PRITINAGAR |
200000 |
IMPROVEMENT OF BT ROAD FROM H/O SUMOTISH BAGCHI TOWARDS H/O SARAJ DAS AT PRITINAGAR 1 |
Roof laid |
-
latitude : 23.1256309,23.1256309
Longitude : 88.547785,88.547785
file name : Image_18052023093036100.png
|
2023-05-18 09:30:36.198487 |
230 |
67287711 |
IMPROVEMENT OF BT ROAD FROM H/O SUMOTISH BAGCHI TOWARDS H/O SARAJ DAS AT PRITINAGAR |
200000 |
IMPROVEMENT OF BT ROAD FROM H/O SUMOTISH BAGCHI TOWARDS H/O SARAJ DAS AT PRITINAGAR 1 |
Plinth level |
-
latitude : 23.1236978,23.1236978
Longitude : 88.547478,88.547478
file name : Image_03052023125521426.png
|
2023-05-03 12:55:21.56149 |
231 |
67287711 |
IMPROVEMENT OF BT ROAD FROM H/O SUMOTISH BAGCHI TOWARDS H/O SARAJ DAS AT PRITINAGAR |
200000 |
IMPROVEMENT OF BT ROAD FROM H/O SUMOTISH BAGCHI TOWARDS H/O SARAJ DAS AT PRITINAGAR 1 |
Completion of work |
-
latitude : 23.1256883,23.1256883
Longitude : 88.5478034,88.5478034
file name : Image_05042023133055460.png
|
2023-04-05 13:30:55.561363 |
232 |
57201343 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O SABITA MONDAL TOWARDS H/O JAYANTA MONDAL AT SANSAD NO VII |
80000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O SABITA MONDAL TOWARDS H/O JAYANTA MONDAL AT SANSAD NO VII1 |
Roof laid |
-
latitude : 23.125578607432544,23.125578607432544
Longitude : 88.53216991759837,88.53216991759837
file name : Image_14042023091210444.png
|
2023-04-14 09:12:10.523174 |
233 |
57201343 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O SABITA MONDAL TOWARDS H/O JAYANTA MONDAL AT SANSAD NO VII |
80000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O SABITA MONDAL TOWARDS H/O JAYANTA MONDAL AT SANSAD NO VII1 |
Plinth level |
-
latitude : 23.125589503906667,23.125589503906667
Longitude : 88.5321834962815,88.5321834962815
file name : Image_10042023135302658.png
|
2023-04-10 13:53:02.746399 |
234 |
57201343 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O SABITA MONDAL TOWARDS H/O JAYANTA MONDAL AT SANSAD NO VII |
80000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O SABITA MONDAL TOWARDS H/O JAYANTA MONDAL AT SANSAD NO VII1 |
Completion of work |
-
latitude : 23.125583636574447,23.125583636574447
Longitude : 88.5322149284184,88.5322149284184
file name : Image_05042023124141434.png
|
2023-04-05 12:41:41.567361 |
235 |
57798680 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O CHITTYA SARKAR TOWARDS HOUSE OF DHRUBA DEY AT SANSAD NO XIII |
350000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O CHITTYA SARKAR TOWARDS HOUSE OF DHRUBA DEY AT SANSAD NO XIII1 |
Roof laid |
-
latitude : 23.1209035,23.1209035
Longitude : 88.5449351,88.5449351
file name : Image_18052023131637575.png
|
2023-05-18 13:16:37.677983 |
236 |
57798680 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O CHITTYA SARKAR TOWARDS HOUSE OF DHRUBA DEY AT SANSAD NO XIII |
350000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O CHITTYA SARKAR TOWARDS HOUSE OF DHRUBA DEY AT SANSAD NO XIII1 |
Plinth level |
-
latitude : 23.1197249,23.1197249
Longitude : 88.5454654,88.5454654
file name : Image_18042023155052203.png
|
2023-04-18 15:50:52.287739 |
237 |
57798680 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O CHITTYA SARKAR TOWARDS HOUSE OF DHRUBA DEY AT SANSAD NO XIII |
350000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O CHITTYA SARKAR TOWARDS HOUSE OF DHRUBA DEY AT SANSAD NO XIII1 |
Completion of work |
-
latitude : 23.1209015,23.1209015
Longitude : 88.5448178,88.5448178
file name : Image_29032023144951423.png
|
2023-03-29 14:49:51.530891 |
238 |
57190075 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O SUBRATA BISWAS TOWADS H/O LALITA BISWAS AT SANSAD NO V |
80000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O SUBRATA BISWAS TOWADS H/O LALITA BISWAS AT SANSAD NO V1 |
Roof laid |
-
latitude : 23.1313192,23.1313192
Longitude : 88.5339636,88.5339636
file name : Image_05042023130640870.png
|
2023-04-05 13:06:40.96797 |
239 |
57190075 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O SUBRATA BISWAS TOWADS H/O LALITA BISWAS AT SANSAD NO V |
80000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O SUBRATA BISWAS TOWADS H/O LALITA BISWAS AT SANSAD NO V1 |
Plinth level |
-
latitude : 23.1313193,23.1313193
Longitude : 88.5339625,88.5339625
file name : Image_03042023124706718.png
|
2023-04-03 12:47:06.816616 |
240 |
57190075 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O SUBRATA BISWAS TOWADS H/O LALITA BISWAS AT SANSAD NO V |
80000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O SUBRATA BISWAS TOWADS H/O LALITA BISWAS AT SANSAD NO V1 |
Completion of work |
-
latitude : 23.1313212,23.1313212
Longitude : 88.5339641,88.5339641
file name : Image_23032023162658679.png
|
2023-03-23 16:26:58.776259 |
241 |
64318511 |
CONSTARUCTION OF BOUNDARY WALL OF GP OWN LAND AT NIYAMATPUR SANSAD NO IV |
350000 |
CONSTARUCTION OF BOUNDARY WALL OF GP OWN LAND AT NIYAMATPUR SANSAD NO IV1 |
Roof laid |
-
latitude : 23.122702441178262
Longitude : 88.5423341486603
file name : Image_15112022084655605.png
|
2022-11-15 08:46:55.711189 |
242 |
64318511 |
CONSTARUCTION OF BOUNDARY WALL OF GP OWN LAND AT NIYAMATPUR SANSAD NO IV |
350000 |
CONSTARUCTION OF BOUNDARY WALL OF GP OWN LAND AT NIYAMATPUR SANSAD NO IV1 |
Plinth level |
-
latitude : 23.126535024493933
Longitude : 88.52723808959126
file name : Image_29092022140120385.png
|
2022-09-29 14:01:20.448115 |
243 |
64318511 |
CONSTARUCTION OF BOUNDARY WALL OF GP OWN LAND AT NIYAMATPUR SANSAD NO IV |
350000 |
CONSTARUCTION OF BOUNDARY WALL OF GP OWN LAND AT NIYAMATPUR SANSAD NO IV1 |
Completion of work |
-
latitude : 23.126326566562057
Longitude : 88.52735836990178
file name : Image_29092022135503872.png
|
2022-09-29 13:55:03.934574 |
244 |
48066341 |
CONSTRUCTION OF PCC ROAD FROM PUCCA RASTHA TOWARDS H/O PARIMAL BISWAS AT SANSAD NO V |
300000 |
CONSTRUCTION OF PCC ROAD FROM PUCCA RASTHA TOWARDS H/O PARIMAL BISWAS AT SANSAD NO V1 |
Roof laid |
-
latitude : 23.129418,23.129418,23.130768639966846
Longitude : 88.5385555,88.5385555,88.5337654966861
file name : Image_08092022084855933.png
|
2022-09-08 08:48:56.030389 |
245 |
48066341 |
CONSTRUCTION OF PCC ROAD FROM PUCCA RASTHA TOWARDS H/O PARIMAL BISWAS AT SANSAD NO V |
300000 |
CONSTRUCTION OF PCC ROAD FROM PUCCA RASTHA TOWARDS H/O PARIMAL BISWAS AT SANSAD NO V1 |
Plinth level |
-
latitude : 23.130742656067014,23.130742656067014
Longitude : 88.53384051471949,88.53384051471949
file name : Image_06092022155150476.png
|
2022-09-06 15:51:50.577584 |
246 |
48066341 |
CONSTRUCTION OF PCC ROAD FROM PUCCA RASTHA TOWARDS H/O PARIMAL BISWAS AT SANSAD NO V |
300000 |
CONSTRUCTION OF PCC ROAD FROM PUCCA RASTHA TOWARDS H/O PARIMAL BISWAS AT SANSAD NO V1 |
Completion of work |
-
latitude : 23.1294207,23.13082341570407
Longitude : 88.5388577,88.53385115973651
file name : Image_05092022164054090.png
|
2022-09-05 16:40:54.181304 |
247 |
48057979 |
CONSTRUCTION OF PCC ROAD FROM PUCCA ROAD TOWARDS H/O MANMATHA (UDAYPUR) AT SANSAD NO IV |
155256 |
CONSTRUCTION OF PCC ROAD FROM PUCCA ROAD TOWARDS H/O MANMATHA (UDAYPUR) AT SANSAD NO IV1 |
Roof laid |
-
latitude : 23.1349892,23.1349892
Longitude : 88.5292662,88.5292662
file name : Image_21102022132459782.png
|
2022-10-21 13:24:59.873 |
248 |
48057979 |
CONSTRUCTION OF PCC ROAD FROM PUCCA ROAD TOWARDS H/O MANMATHA (UDAYPUR) AT SANSAD NO IV |
155256 |
CONSTRUCTION OF PCC ROAD FROM PUCCA ROAD TOWARDS H/O MANMATHA (UDAYPUR) AT SANSAD NO IV1 |
Plinth level |
-
latitude : 23.134800335392356,23.134800335392356
Longitude : 88.53015893138945,88.53015893138945
file name : Image_19102022143735338.png
|
2022-10-19 14:37:35.469453 |
249 |
48057979 |
CONSTRUCTION OF PCC ROAD FROM PUCCA ROAD TOWARDS H/O MANMATHA (UDAYPUR) AT SANSAD NO IV |
155256 |
CONSTRUCTION OF PCC ROAD FROM PUCCA ROAD TOWARDS H/O MANMATHA (UDAYPUR) AT SANSAD NO IV1 |
Completion of work |
-
latitude : 23.134770202450454,23.134770202450454
Longitude : 88.53030092082918,88.53030092082918
file name : Image_17102022125534434.png
|
2022-10-17 12:55:34.560988 |
250 |
48052079 |
CONSTRUCTION OF PCC ROAD FROM H/O BANAMALI BISWAS TOWARDS H/O DINABANDHU MUHURY AT II |
203000 |
CONSTRUCTION OF PCC ROAD FROM H/O BANAMALI BISWAS TOWARDS H/O DINABANDHU MUHURY AT II1 |
Roof laid |
-
latitude : 23.12892378307879,23.128923657350242
Longitude : 88.51455509662628,88.51454311050475
file name : Image_19052022140247701.png
|
2022-05-19 14:02:47.777076 |
251 |
48052079 |
CONSTRUCTION OF PCC ROAD FROM H/O BANAMALI BISWAS TOWARDS H/O DINABANDHU MUHURY AT II |
203000 |
CONSTRUCTION OF PCC ROAD FROM H/O BANAMALI BISWAS TOWARDS H/O DINABANDHU MUHURY AT II1 |
Plinth level |
-
latitude : 23.12893987633288,23.12893987633288
Longitude : 88.51466028951108,88.51466028951108
file name : Image_18052022153245211.png
|
2022-05-18 15:32:45.320552 |
252 |
48052079 |
CONSTRUCTION OF PCC ROAD FROM H/O BANAMALI BISWAS TOWARDS H/O DINABANDHU MUHURY AT II |
203000 |
CONSTRUCTION OF PCC ROAD FROM H/O BANAMALI BISWAS TOWARDS H/O DINABANDHU MUHURY AT II1 |
Completion of work |
-
latitude : 23.128940337337554,23.128940337337554
Longitude : 88.51438896730542,88.51438896730542
file name : Image_26042022121418541.png
|
2022-04-26 12:14:18.650844 |
253 |
48164320 |
CONSTRUCTION OF PCC ROAD FROM H/O KANAI DAS TOWARDS H/O KRISHNA GHOSH AT SANSAD NO XVII |
125000 |
CONSTRUCTION OF PCC ROAD FROM H/O KANAI DAS TOWARDS H/O KRISHNA GHOSH AT SANSAD NO XVII1 |
Plinth level |
-
latitude : 23.1233417,23.1235058
Longitude : 88.546612,88.5463406
file name : Image_14052022111202611.png
|
2022-05-14 11:12:02.691911 |
254 |
48164320 |
CONSTRUCTION OF PCC ROAD FROM H/O KANAI DAS TOWARDS H/O KRISHNA GHOSH AT SANSAD NO XVII |
125000 |
CONSTRUCTION OF PCC ROAD FROM H/O KANAI DAS TOWARDS H/O KRISHNA GHOSH AT SANSAD NO XVII1 |
Completion of work |
-
latitude : 23.1234947,23.1234947
Longitude : 88.5463496,88.5463496
file name : Image_30042022094319539.png
|
2022-04-30 09:43:19.623918 |
255 |
61871540 |
CONSTRUCTION OF PCC ROAD FROM H/O SANJAY NAG TOWARDS H/O NIKHIL NANDI AT PRITINAGAR SANSAD NO XII |
54689 |
CONSTRUCTION OF PCC ROAD FROM H/O SANJAY NAG TOWARDS H/O NIKHIL NANDI AT PRITINAGAR SANSAD NO XII1 |
Plinth level |
-
latitude : 23.1248171,23.1248171
Longitude : 88.5448417,88.5448417
file name : Image_13052022172037616.png
|
2022-05-13 17:20:37.686171 |
256 |
61871540 |
CONSTRUCTION OF PCC ROAD FROM H/O SANJAY NAG TOWARDS H/O NIKHIL NANDI AT PRITINAGAR SANSAD NO XII |
54689 |
CONSTRUCTION OF PCC ROAD FROM H/O SANJAY NAG TOWARDS H/O NIKHIL NANDI AT PRITINAGAR SANSAD NO XII1 |
Completion of work |
-
latitude : 23.1248079,23.1248079
Longitude : 88.5448479,88.5448479
file name : Image_30042022095649847.png
|
2022-04-30 09:56:49.952798 |
257 |
64318326 |
CONSTRUCTION OF COMMUNITY TOILET AT BHAGIRATHI BAZAR GROUND AT PARNIYAMATPUR SANSAD NO I |
220000 |
CONSTRUCTION OF COMMUNITY TOILET AT BHAGIRATHI BAZAR GROUND AT PARNIYAMATPUR SANSAD NO I1 |
Roof laid |
-
latitude : 23.13170686829835
Longitude : 88.50902714766562
file name : Image_13032023151608628.png
|
2023-03-13 15:16:08.73026 |
258 |
64318326 |
CONSTRUCTION OF COMMUNITY TOILET AT BHAGIRATHI BAZAR GROUND AT PARNIYAMATPUR SANSAD NO I |
220000 |
CONSTRUCTION OF COMMUNITY TOILET AT BHAGIRATHI BAZAR GROUND AT PARNIYAMATPUR SANSAD NO I1 |
Plinth level |
-
latitude : 23.131633065640926
Longitude : 88.5089454241097
file name : Image_13032023151405341.png
|
2023-03-13 15:14:05.43091 |
259 |
64318326 |
CONSTRUCTION OF COMMUNITY TOILET AT BHAGIRATHI BAZAR GROUND AT PARNIYAMATPUR SANSAD NO I |
220000 |
CONSTRUCTION OF COMMUNITY TOILET AT BHAGIRATHI BAZAR GROUND AT PARNIYAMATPUR SANSAD NO I1 |
Completion of work |
-
latitude : 23.13165590632707
Longitude : 88.50896176882088
file name : Image_13032023150801031.png
|
2023-03-13 15:08:01.125319 |
260 |
65687941 |
Operation & maintenance of drinking water supply system |
350000 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 23.1266298,23.1266298
Longitude : 88.5449549,88.5449549
file name : Image_16112022141703746.png
|
2022-11-16 14:17:03.822002 |
261 |
65687941 |
Operation & maintenance of drinking water supply system |
350000 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.1264329,23.1264329
Longitude : 88.5450012,88.5450012
file name : Image_14112022092643279.png
|
2022-11-14 09:26:43.370524 |
262 |
65687941 |
Operation & maintenance of drinking water supply system |
350000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.1259776,23.1259776
Longitude : 88.5449862,88.5449862
file name : Image_02112022094656027.png
|
2022-11-02 09:46:56.124229 |
263 |
48523974 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O RAJDIP BISWAS TOWARDS H/O RAMSARAN |
280000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O RAJDIP BISWAS TOWARDS H/O RAMSARAN1 |
Plinth level |
-
latitude : 23.13326728530228,23.13326728530228
Longitude : 88.54552337899804,88.54552337899804
file name : Image_01062022121504111.png
|
2022-06-01 12:15:04.186331 |
264 |
48523974 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O RAJDIP BISWAS TOWARDS H/O RAMSARAN |
280000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O RAJDIP BISWAS TOWARDS H/O RAMSARAN1 |
Plinth level |
-
latitude : 23.138791252858937,23.138791252858937
Longitude : 88.54243330657482,88.54243330657482
file name : Image_30042022082111576.png
|
2022-04-30 08:21:11.67227 |
265 |
48523974 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O RAJDIP BISWAS TOWARDS H/O RAMSARAN |
280000 |
CONSTRUCTION OF PUCCA DRAIN FROM H/O RAJDIP BISWAS TOWARDS H/O RAMSARAN1 |
Completion of work |
-
latitude : 23.138489671982825,23.138489671982825
Longitude : 88.54243858717382,88.54243858717382
file name : Image_16032022160315629.png
|
2022-03-16 16:03:15.763382 |
266 |
48144269 |
CONSTRUCTION OF PCC ROAD FROM H/O HARI MATHUYA TOWARDS H/O GOBINDA SIKDAR AT SANSAD NO XII |
150000 |
CONSTRUCTION OF PCC ROAD FROM H/O HARI MATHUYA TOWARDS H/O GOBINDA SIKDAR AT SANSAD NO XII1 |
Roof laid |
-
latitude : 23.131596,23.131596
Longitude : 88.5433186,88.5433186
file name : Image_01112022145805456.png
|
2022-11-01 14:58:05.548622 |
267 |
48144269 |
CONSTRUCTION OF PCC ROAD FROM H/O HARI MATHUYA TOWARDS H/O GOBINDA SIKDAR AT SANSAD NO XII |
150000 |
CONSTRUCTION OF PCC ROAD FROM H/O HARI MATHUYA TOWARDS H/O GOBINDA SIKDAR AT SANSAD NO XII1 |
Roof laid |
-
latitude : 23.1315964,23.1315964
Longitude : 88.543316,88.543316
file name : Image_01112022144851388.png
|
2022-11-01 14:48:51.469711 |
268 |
48144269 |
CONSTRUCTION OF PCC ROAD FROM H/O HARI MATHUYA TOWARDS H/O GOBINDA SIKDAR AT SANSAD NO XII |
150000 |
CONSTRUCTION OF PCC ROAD FROM H/O HARI MATHUYA TOWARDS H/O GOBINDA SIKDAR AT SANSAD NO XII1 |
Roof laid |
-
latitude : 23.1201603,23.1201603
Longitude : 88.543335,88.543335
file name : Image_21102022091738054.png
|
2022-10-21 09:17:38.130962 |
269 |
48144269 |
CONSTRUCTION OF PCC ROAD FROM H/O HARI MATHUYA TOWARDS H/O GOBINDA SIKDAR AT SANSAD NO XII |
150000 |
CONSTRUCTION OF PCC ROAD FROM H/O HARI MATHUYA TOWARDS H/O GOBINDA SIKDAR AT SANSAD NO XII1 |
Plinth level |
-
latitude : 23.1201598,23.1201598
Longitude : 88.5433388,88.5433388
file name : Image_20102022125559960.png
|
2022-10-20 12:56:00.112236 |
270 |
48144269 |
CONSTRUCTION OF PCC ROAD FROM H/O HARI MATHUYA TOWARDS H/O GOBINDA SIKDAR AT SANSAD NO XII |
150000 |
CONSTRUCTION OF PCC ROAD FROM H/O HARI MATHUYA TOWARDS H/O GOBINDA SIKDAR AT SANSAD NO XII1 |
Completion of work |
-
latitude : 23.1201581,23.1201581
Longitude : 88.543341,88.543341
file name : Image_20102022124802505.png
|
2022-10-20 12:48:02.674824 |
271 |
48142057 |
CONSTRUCTION OF BFS ROAD FROM H/O RAJU KARMAKAR TOWARDS H/O SUBHAS PAL AT SANSAD NO X |
100000 |
CONSTRUCTION OF BFS ROAD FROM H/O RAJU KARMAKAR TOWARDS H/O SUBHAS PAL AT SANSAD NO X1 |
Roof laid |
-
latitude : 23.1315977,23.1315977
Longitude : 88.5433183,88.5433183
file name : Image_01112022145613240.png
|
2022-11-01 14:56:13.3307 |
272 |
48142057 |
CONSTRUCTION OF BFS ROAD FROM H/O RAJU KARMAKAR TOWARDS H/O SUBHAS PAL AT SANSAD NO X |
100000 |
CONSTRUCTION OF BFS ROAD FROM H/O RAJU KARMAKAR TOWARDS H/O SUBHAS PAL AT SANSAD NO X1 |
Plinth level |
-
latitude : 23.1315935,23.1315935
Longitude : 88.5433148,88.5433148
file name : Image_01112022145350663.png
|
2022-11-01 14:53:50.754125 |
273 |
48142057 |
CONSTRUCTION OF BFS ROAD FROM H/O RAJU KARMAKAR TOWARDS H/O SUBHAS PAL AT SANSAD NO X |
100000 |
CONSTRUCTION OF BFS ROAD FROM H/O RAJU KARMAKAR TOWARDS H/O SUBHAS PAL AT SANSAD NO X1 |
Plinth level |
-
latitude : 23.1253491,23.1253491,23.12045910861343
Longitude : 88.541275,88.541275,88.54199836961925
file name : Image_01112022144839627.png
|
2022-11-01 14:48:39.716025 |
274 |
48142057 |
CONSTRUCTION OF BFS ROAD FROM H/O RAJU KARMAKAR TOWARDS H/O SUBHAS PAL AT SANSAD NO X |
100000 |
CONSTRUCTION OF BFS ROAD FROM H/O RAJU KARMAKAR TOWARDS H/O SUBHAS PAL AT SANSAD NO X1 |
Completion of work |
-
latitude : 23.12051597982645,23.12051597982645
Longitude : 88.54199979454279,88.54199979454279
file name : Image_21102022090711166.png
|
2022-10-21 09:07:11.242354 |
275 |
48173408 |
CONSTRUCTION OF PCC ROAD FROM H/O RAMSARAN BARMAN TOWARDS H/O ASIT BALA AT SANSAD NO XIX |
193469 |
CONSTRUCTION OF PCC ROAD FROM H/O RAMSARAN BARMAN TOWARDS H/O ASIT BALA AT SANSAD NO XIX1 |
Roof laid |
-
latitude : 23.13804698176682,23.13804698176682
Longitude : 88.54249256663024,88.54249256663024
file name : Image_04072022125445629.png
|
2022-07-04 12:54:45.858384 |
276 |
48173408 |
CONSTRUCTION OF PCC ROAD FROM H/O RAMSARAN BARMAN TOWARDS H/O ASIT BALA AT SANSAD NO XIX |
193469 |
CONSTRUCTION OF PCC ROAD FROM H/O RAMSARAN BARMAN TOWARDS H/O ASIT BALA AT SANSAD NO XIX1 |
Plinth level |
-
latitude : 23.13800477888435,23.13804706558585
Longitude : 88.54250522330403,88.54254604317248
file name : Image_04072022125123879.png
|
2022-07-04 12:51:23.976844 |
277 |
48173408 |
CONSTRUCTION OF PCC ROAD FROM H/O RAMSARAN BARMAN TOWARDS H/O ASIT BALA AT SANSAD NO XIX |
193469 |
CONSTRUCTION OF PCC ROAD FROM H/O RAMSARAN BARMAN TOWARDS H/O ASIT BALA AT SANSAD NO XIX1 |
Completion of work |
-
latitude : 23.138043964281678,23.138043964281678
Longitude : 88.54251746088266,88.54251746088266
file name : Image_04072022124517009.png
|
2022-07-04 12:45:17.092702 |
278 |
48066927 |
CONSTRUCTION OF PCC ROAD FROM H/O DILIP BHOWMIK TOWARDS H/O PROSENJIT ROUT AT V |
75000 |
CONSTRUCTION OF PCC ROAD FROM H/O DILIP BHOWMIK TOWARDS H/O PROSENJIT ROUT AT V1 |
Plinth level |
-
latitude : 23.1350812,23.1350812
Longitude : 88.5328313,88.5328313
file name : Image_05052022161804760.png
|
2022-05-05 16:18:04.837597 |
279 |
48066927 |
CONSTRUCTION OF PCC ROAD FROM H/O DILIP BHOWMIK TOWARDS H/O PROSENJIT ROUT AT V |
75000 |
CONSTRUCTION OF PCC ROAD FROM H/O DILIP BHOWMIK TOWARDS H/O PROSENJIT ROUT AT V1 |
Roof laid |
-
latitude : 23.1352629,23.1352629
Longitude : 88.5327317,88.5327317
file name : Image_10052022083944853.png
|
2022-05-10 08:39:44.932587 |
280 |
48066927 |
CONSTRUCTION OF PCC ROAD FROM H/O DILIP BHOWMIK TOWARDS H/O PROSENJIT ROUT AT V |
75000 |
CONSTRUCTION OF PCC ROAD FROM H/O DILIP BHOWMIK TOWARDS H/O PROSENJIT ROUT AT V1 |
Completion of work |
-
latitude : 23.1351416,23.1351416
Longitude : 88.5327433,88.5327433
file name : Image_25042022143541611.png
|
2022-04-25 14:35:41.70676 |
281 |
64319102 |
Construction of PCC basement for SWM Vehical and establishment of GP Macheniery AT Niyamatpur |
177627 |
Construction of PCC basement for SWM Vehical and establishment of GP Macheniery AT Niyamatpur 1 |
Roof laid |
-
latitude : 23.12646323349327
Longitude : 88.5273504909128
file name : Image_22112022095738919.png
|
2022-11-22 09:57:39.329912 |
282 |
64319102 |
Construction of PCC basement for SWM Vehical and establishment of GP Macheniery AT Niyamatpur |
177627 |
Construction of PCC basement for SWM Vehical and establishment of GP Macheniery AT Niyamatpur 1 |
Plinth level |
-
latitude : 23.12665170058608
Longitude : 88.52739449590445
file name : Image_16112022125851077.png
|
2022-11-16 12:58:51.173938 |
283 |
64319102 |
Construction of PCC basement for SWM Vehical and establishment of GP Macheniery AT Niyamatpur |
177627 |
Construction of PCC basement for SWM Vehical and establishment of GP Macheniery AT Niyamatpur 1 |
Completion of work |
-
latitude : 23.126578400842845
Longitude : 88.52738041430712
file name : Image_03112022124005206.png
|
2022-11-03 12:40:05.272294 |
284 |
48180174 |
CONSTRUCTION OF BOUNDARY WALL ON LAND OF GRAM PANCHAYET AT NIYAMATPUR |
310000 |
CONSTRUCTION OF BOUNDARY WALL ON LAND OF GRAM PANCHAYET AT NIYAMATPUR1 |
Roof laid |
-
latitude : 23.126972476020455
Longitude : 88.5275421012193
file name : Image_21052022095515198.png
|
2022-05-21 09:55:15.29995 |
285 |
48180174 |
CONSTRUCTION OF BOUNDARY WALL ON LAND OF GRAM PANCHAYET AT NIYAMATPUR |
310000 |
CONSTRUCTION OF BOUNDARY WALL ON LAND OF GRAM PANCHAYET AT NIYAMATPUR1 |
Plinth level |
-
latitude : 23.126925537362695
Longitude : 88.52751201018691
file name : Image_27042022082948519.png
|
2022-04-27 08:29:48.61136 |
286 |
48180174 |
CONSTRUCTION OF BOUNDARY WALL ON LAND OF GRAM PANCHAYET AT NIYAMATPUR |
310000 |
CONSTRUCTION OF BOUNDARY WALL ON LAND OF GRAM PANCHAYET AT NIYAMATPUR1 |
Completion of work |
-
latitude : 23.126721689477563
Longitude : 88.52735317312181
file name : Image_01042022122608123.png
|
2022-04-01 12:26:08.259336 |
287 |
61871344 |
CONSTRUCTION OF PCC ROAD FROM H/O ASHOK BISWAS TOWARDS AMAL BISWAS AT UKILNARA SANSAD NO- V |
82679 |
CONSTRUCTION OF PCC ROAD FROM H/O ASHOK BISWAS TOWARDS AMAL BISWAS AT UKILNARA SANSAD NO- V1 |
Plinth level |
-
latitude : 23.130252943374217,23.130252943374217
Longitude : 88.53565997444093,88.53565997444093
file name : Image_13052022122040566.png
|
2022-05-13 12:20:40.654852 |
288 |
61871344 |
CONSTRUCTION OF PCC ROAD FROM H/O ASHOK BISWAS TOWARDS AMAL BISWAS AT UKILNARA SANSAD NO- V |
82679 |
CONSTRUCTION OF PCC ROAD FROM H/O ASHOK BISWAS TOWARDS AMAL BISWAS AT UKILNARA SANSAD NO- V1 |
Completion of work |
-
latitude : 23.13046668190509,23.13046668190509
Longitude : 88.53559769690037,88.53559769690037
file name : Image_30042022102104730.png
|
2022-04-30 10:21:04.842458 |
289 |
48177219 |
CONSTRUCTION OF PCC ROAD FROM H/O ABANI KANTA DAS TOWARDS H/O ARCHANA MALAKAR AT SANSAD NO XXII |
103000 |
CONSTRUCTION OF PCC ROAD FROM H/O ABANI KANTA DAS TOWARDS H/O ARCHANA MALAKAR AT SANSAD NO XXII1 |
Roof laid |
-
latitude : 23.1288137,23.1288137
Longitude : 88.5384718,88.5384718
file name : Image_29042022133751955.png
|
2022-04-29 13:37:52.049783 |
290 |
48177219 |
CONSTRUCTION OF PCC ROAD FROM H/O ABANI KANTA DAS TOWARDS H/O ARCHANA MALAKAR AT SANSAD NO XXII |
103000 |
CONSTRUCTION OF PCC ROAD FROM H/O ABANI KANTA DAS TOWARDS H/O ARCHANA MALAKAR AT SANSAD NO XXII1 |
Plinth level |
-
latitude : 23.129160404205322,23.129160404205322
Longitude : 88.53848056867719,88.53848056867719
file name : Image_27042022143203670.png
|
2022-04-27 14:32:03.762616 |
291 |
48177219 |
CONSTRUCTION OF PCC ROAD FROM H/O ABANI KANTA DAS TOWARDS H/O ARCHANA MALAKAR AT SANSAD NO XXII |
103000 |
CONSTRUCTION OF PCC ROAD FROM H/O ABANI KANTA DAS TOWARDS H/O ARCHANA MALAKAR AT SANSAD NO XXII1 |
Completion of work |
-
latitude : 23.1288162,23.1288162
Longitude : 88.5384723,88.5384723
file name : Image_20042022133346934.png
|
2022-04-20 13:33:47.096457 |
292 |
48145377 |
CONSTRUCTION OF PCC ROAD FROM H/O JAGA DEBNATH TOWARDS H/O ASHOK DAS |
183000 |
CONSTRUCTION OF PCC ROAD FROM H/O JAGA DEBNATH TOWARDS H/O ASHOK DAS1 |
Roof laid |
-
latitude : 23.1193754,23.1193754
Longitude : 88.544873,88.544873
file name : Image_04052022090257649.png
|
2022-05-04 09:02:57.732396 |
293 |
48145377 |
CONSTRUCTION OF PCC ROAD FROM H/O JAGA DEBNATH TOWARDS H/O ASHOK DAS |
183000 |
CONSTRUCTION OF PCC ROAD FROM H/O JAGA DEBNATH TOWARDS H/O ASHOK DAS1 |
Plinth level |
-
latitude : 23.1193637,23.1193637
Longitude : 88.5448891,88.5448891
file name : Image_02052022125310268.png
|
2022-05-02 12:53:10.380258 |
294 |
48145377 |
CONSTRUCTION OF PCC ROAD FROM H/O JAGA DEBNATH TOWARDS H/O ASHOK DAS |
183000 |
CONSTRUCTION OF PCC ROAD FROM H/O JAGA DEBNATH TOWARDS H/O ASHOK DAS1 |
Completion of work |
-
latitude : 23.135472019203007,23.135472019203007
Longitude : 88.54013004340231,88.54013004340231
file name : Image_26042022151232949.png
|
2022-04-26 15:12:33.028651 |
295 |
48073722 |
CONSTRUCTION OF PCC ROAD FROM PUCCA RASTHA TOWARDS H/O DHARMENDRA BISWAS AT SANSAD NO VII |
150000 |
CONSTRUCTION OF PCC ROAD FROM PUCCA RASTHA TOWARDS H/O DHARMENDRA BISWAS AT SANSAD NO VII1 |
Plinth level |
-
latitude : 23.12691556289792,23.12691556289792
Longitude : 88.53268523700535,88.53268523700535
file name : Image_06052022124102806.png
|
2022-05-06 12:41:02.898503 |
296 |
48073722 |
CONSTRUCTION OF PCC ROAD FROM PUCCA RASTHA TOWARDS H/O DHARMENDRA BISWAS AT SANSAD NO VII |
150000 |
CONSTRUCTION OF PCC ROAD FROM PUCCA RASTHA TOWARDS H/O DHARMENDRA BISWAS AT SANSAD NO VII1 |
Roof laid |
-
latitude : 23.1264444,23.1264444
Longitude : 88.5326867,88.5326867
file name : Image_10052022090530250.png
|
2022-05-10 09:05:30.311526 |
297 |
48073722 |
CONSTRUCTION OF PCC ROAD FROM PUCCA RASTHA TOWARDS H/O DHARMENDRA BISWAS AT SANSAD NO VII |
150000 |
CONSTRUCTION OF PCC ROAD FROM PUCCA RASTHA TOWARDS H/O DHARMENDRA BISWAS AT SANSAD NO VII1 |
Completion of work |
-
latitude : 23.1272055,23.1272055
Longitude : 88.5328088,88.5328088
file name : Image_20042022131211229.png
|
2022-04-20 13:12:11.360582 |
298 |
48067404 |
CONSTRUCTION OF PCC ROAD FROM H/O RAMEN SHARMA TOWARDS H/O UTTAM SARKAR AT VI |
150000 |
CONSTRUCTION OF PCC ROAD FROM H/O RAMEN SHARMA TOWARDS H/O UTTAM SARKAR AT VI1 |
Roof laid |
-
latitude : 23.1240577,23.1240607
Longitude : 88.5352035,88.5352047
file name : Image_30042022083119249.png
|
2022-04-30 08:31:19.33122 |
299 |
48067404 |
CONSTRUCTION OF PCC ROAD FROM H/O RAMEN SHARMA TOWARDS H/O UTTAM SARKAR AT VI |
150000 |
CONSTRUCTION OF PCC ROAD FROM H/O RAMEN SHARMA TOWARDS H/O UTTAM SARKAR AT VI1 |
Plinth level |
-
latitude : 23.124093208462,23.1238821
Longitude : 88.53541865944862,88.5350776
file name : Image_29042022125153879.png
|
2022-04-29 12:51:53.998203 |
300 |
48067404 |
CONSTRUCTION OF PCC ROAD FROM H/O RAMEN SHARMA TOWARDS H/O UTTAM SARKAR AT VI |
150000 |
CONSTRUCTION OF PCC ROAD FROM H/O RAMEN SHARMA TOWARDS H/O UTTAM SARKAR AT VI1 |
Completion of work |
-
latitude : 23.1238757,23.1238757
Longitude : 88.5350832,88.5350832
file name : Image_25042022144500586.png
|
2022-04-25 14:45:00.676527 |
301 |
39053575 |
Construction of Blacktop road from Prosenjit Ghosh towards Akhay Halder |
350000 |
Construction of Blacktop road from Prosenjit Ghosh towards Akhay Halder1 |
Roof laid |
-
latitude : 23.12918471172452,23.129215012304485,23.129221717827022
Longitude : 88.51009726524353,88.5101386718452,88.51010732352734
file name : Image_17062021134003885.png
|
2021-06-17 13:40:04.227127 |
302 |
39053575 |
Construction of Blacktop road from Prosenjit Ghosh towards Akhay Halder |
350000 |
Construction of Blacktop road from Prosenjit Ghosh towards Akhay Halder1 |
Plinth level |
-
latitude : 23.129150052554905,23.12915445305407
Longitude : 88.51008469238877,88.51009433157742
file name : Image_17062021133604380.png
|
2021-06-17 13:36:04.714108 |
303 |
39053575 |
Construction of Blacktop road from Prosenjit Ghosh towards Akhay Halder |
350000 |
Construction of Blacktop road from Prosenjit Ghosh towards Akhay Halder1 |
Completion of work |
-
latitude : 23.12916597817093,23.129174611531198
Longitude : 88.5100797470659,88.51004471071064
file name : Image_17062021133125405.png
|
2021-06-17 13:31:25.77815 |
304 |
39055571 |
Construction of Blacktop road from Sufal Mondal towards Sushil Mondal |
295498 |
Construction of Blacktop road from Sufal Mondal towards Sushil Mondal 1 |
Roof laid |
-
latitude : 23.13240671530366,23.13240671530366
Longitude : 88.51695441640913,88.51695441640913
file name : Image_16022022135405397.png
|
2022-02-16 13:54:05.517797 |
305 |
39055571 |
Construction of Blacktop road from Sufal Mondal towards Sushil Mondal |
295498 |
Construction of Blacktop road from Sufal Mondal towards Sushil Mondal 1 |
Plinth level |
-
latitude : 23.132762401364744,23.132762401364744
Longitude : 88.51711233146489,88.51711233146489
file name : Image_15022022121332561.png
|
2022-02-15 12:13:32.693648 |
306 |
39055571 |
Construction of Blacktop road from Sufal Mondal towards Sushil Mondal |
295498 |
Construction of Blacktop road from Sufal Mondal towards Sushil Mondal 1 |
Completion of work |
-
latitude : 23.132944121025503,23.132944121025503
Longitude : 88.51688585244119,88.51688585244119
file name : Image_09022022134318643.png
|
2022-02-09 13:43:18.793821 |
307 |
39084063 |
Improvement of Concreat road from Nanda lal Sarkar towards House of Sukharanjan |
175000 |
Improvement of Concreat road from Nanda lal Sarkar towards House of Sukharanjan 1 |
Roof laid |
-
latitude : 23.13481303397566,23.13481303397566
Longitude : 88.54999520815909,88.54999520815909
file name : Image_29122021141339549.png
|
2021-12-29 14:13:39.666309 |
308 |
39084063 |
Improvement of Concreat road from Nanda lal Sarkar towards House of Sukharanjan |
175000 |
Improvement of Concreat road from Nanda lal Sarkar towards House of Sukharanjan 1 |
Plinth level |
-
latitude : 23.134914035908878,23.135030712001026
Longitude : 88.54997031390667,88.5499410610646
file name : Image_27122021133058083.png
|
2021-12-27 13:30:58.22275 |
309 |
39084063 |
Improvement of Concreat road from Nanda lal Sarkar towards House of Sukharanjan |
175000 |
Improvement of Concreat road from Nanda lal Sarkar towards House of Sukharanjan 1 |
Completion of work |
-
latitude : 23.135069562122226,23.135069562122226
Longitude : 88.54994919151068,88.54994919151068
file name : Image_15122021132957839.png
|
2021-12-15 13:29:58.007257 |
310 |
39062935 |
Construction of Concreat road from House of Haren Paul towards of Nirmal Ojha |
125000 |
Construction of Concreat road from House of Haren Paul towards of Nirmal Ojha1 |
Roof laid |
-
latitude : 23.119244445115328,23.119244445115328
Longitude : 88.53909756056964,88.53909756056964
file name : Image_04012022092459514.png
|
2022-01-04 09:24:59.644659 |
311 |
39062935 |
Construction of Concreat road from House of Haren Paul towards of Nirmal Ojha |
125000 |
Construction of Concreat road from House of Haren Paul towards of Nirmal Ojha1 |
Plinth level |
-
latitude : 23.11935479287058,23.11935479287058
Longitude : 88.53879706934094,88.53879706934094
file name : Image_01012022103901692.png
|
2022-01-01 10:39:01.858541 |
312 |
39062935 |
Construction of Concreat road from House of Haren Paul towards of Nirmal Ojha |
125000 |
Construction of Concreat road from House of Haren Paul towards of Nirmal Ojha1 |
Completion of work |
-
latitude : 23.1193267,23.1193267
Longitude : 88.5380852,88.5380852
file name : Image_20122021150119540.png
|
2021-12-20 15:01:19.643098 |
313 |
39068956 |
Construction of Sajal Dhara on Land of Kalicharan Chakrapani |
800000 |
Construction of Sajal Dhara on Land of Kalicharan Chakrapani 1 |
Roof laid |
-
latitude : 23.128878395073116
Longitude : 88.51696087047458
file name : Image_20042022130316088.png
|
2022-04-20 13:03:16.202791 |
314 |
39068956 |
Construction of Sajal Dhara on Land of Kalicharan Chakrapani |
800000 |
Construction of Sajal Dhara on Land of Kalicharan Chakrapani 1 |
Plinth level |
-
latitude : 23.128869216889143
Longitude : 88.51698081940413
file name : Image_07042022152855185.png
|
2022-04-07 15:28:55.326246 |
315 |
39068956 |
Construction of Sajal Dhara on Land of Kalicharan Chakrapani |
800000 |
Construction of Sajal Dhara on Land of Kalicharan Chakrapani 1 |
Completion of work |
-
latitude : 23.12890274450183
Longitude : 88.51686959154904
file name : Image_17022022134034072.png
|
2022-02-17 13:40:34.214067 |
316 |
39069037 |
Construction of Sajal Dhara on Land of Daspara Baroary Committee |
800000 |
Construction of Sajal Dhara on Land of Daspara Baroary Committee 1 |
Roof laid |
-
latitude : 23.136224
Longitude : 88.5403741
file name : Image_29032022115803076.png
|
2022-03-29 11:58:03.249887 |
317 |
39069037 |
Construction of Sajal Dhara on Land of Daspara Baroary Committee |
800000 |
Construction of Sajal Dhara on Land of Daspara Baroary Committee 1 |
Plinth level |
-
latitude : 23.1316354
Longitude : 88.5433301
file name : Image_24032022144534240.png
|
2022-03-24 14:45:34.378545 |
318 |
39069037 |
Construction of Sajal Dhara on Land of Daspara Baroary Committee |
800000 |
Construction of Sajal Dhara on Land of Daspara Baroary Committee 1 |
Completion of work |
-
latitude : 23.136689658276737
Longitude : 88.53986022993922
file name : Image_17022022135743607.png
|
2022-02-17 13:57:43.741987 |
319 |
48529558 |
PURCHASE TWO DRINKING WATER SUPPLY TANK |
400000 |
PURCHASE TWO DRINKING WATER SUPPLY TANK1 |
Roof laid |
-
latitude : 23.1288213
Longitude : 88.5359469
file name : Image_31032022124246210.png
|
2022-03-31 12:42:46.347463 |
320 |
48529558 |
PURCHASE TWO DRINKING WATER SUPPLY TANK |
400000 |
PURCHASE TWO DRINKING WATER SUPPLY TANK1 |
Plinth level |
-
latitude : 23.1288209
Longitude : 88.5359476
file name : Image_31032022124011365.png
|
2022-03-31 12:40:11.519721 |
321 |
48529558 |
PURCHASE TWO DRINKING WATER SUPPLY TANK |
400000 |
PURCHASE TWO DRINKING WATER SUPPLY TANK1 |
Completion of work |
-
latitude : 23.128821
Longitude : 88.5359465
file name : Image_31032022123427725.png
|
2022-03-31 12:34:27.893082 |
322 |
48072477 |
CONSTRUCTION OF PCC ROAD FROM H/O SANKAR SARKAR TOWARDS H/O NAROJIT AT VII |
125000 |
CONSTRUCTION OF PCC ROAD FROM H/O SANKAR SARKAR TOWARDS H/O NAROJIT AT VII1 |
Plinth level |
-
latitude : 23.125341860577464,23.125348356552422
Longitude : 88.53534288704395,88.53536074049771
file name : Image_28042022122911727.png
|
2022-04-28 12:29:11.818276 |
323 |
48072477 |
CONSTRUCTION OF PCC ROAD FROM H/O SANKAR SARKAR TOWARDS H/O NAROJIT AT VII |
125000 |
CONSTRUCTION OF PCC ROAD FROM H/O SANKAR SARKAR TOWARDS H/O NAROJIT AT VII1 |
Completion of work |
-
latitude : 23.1262075,23.1262075
Longitude : 88.5353368,88.5353368
file name : Image_22042022153948913.png
|
2022-04-22 15:39:49.002977 |
324 |
39060267 |
Construction of Concreat road from shop of Gobinda roy to Hiran Kundu |
60000 |
Construction of Concreat road from shop of Gobinda roy to Hiran Kundu1 |
Roof laid |
-
latitude : 23.1277615,23.1277615
Longitude : 88.5448375,88.5448375
file name : Image_28032022114158958.png
|
2022-03-28 11:41:59.090073 |
325 |
39060267 |
Construction of Concreat road from shop of Gobinda roy to Hiran Kundu |
60000 |
Construction of Concreat road from shop of Gobinda roy to Hiran Kundu1 |
Plinth level |
-
latitude : 23.127781,23.127781
Longitude : 88.5448211,88.5448211
file name : Image_24032022162122388.png
|
2022-03-24 16:21:22.511598 |
326 |
39060267 |
Construction of Concreat road from shop of Gobinda roy to Hiran Kundu |
60000 |
Construction of Concreat road from shop of Gobinda roy to Hiran Kundu1 |
Completion of work |
-
latitude : 23.1277991,23.1277991
Longitude : 88.5448919,88.5448919
file name : Image_16032022093733446.png
|
2022-03-16 09:37:33.612808 |
327 |
39073904 |
Construction of Drain from Apu Bagchi towards Sashi Biswas |
300000 |
Construction of Drain from Apu Bagchi towards Sashi Biswas1 |
Roof laid |
-
latitude : 23.12186877708882,23.12186877708882
Longitude : 88.52413569577038,88.52413569577038
file name : Image_21052022094607277.png
|
2022-05-21 09:46:07.384527 |
328 |
39073904 |
Construction of Drain from Apu Bagchi towards Sashi Biswas |
300000 |
Construction of Drain from Apu Bagchi towards Sashi Biswas1 |
Plinth level |
-
latitude : 23.12185331247747,23.12185331247747
Longitude : 88.52388490922749,88.52388490922749
file name : Image_19052022100439425.png
|
2022-05-19 10:04:39.50049 |
329 |
39073904 |
Construction of Drain from Apu Bagchi towards Sashi Biswas |
300000 |
Construction of Drain from Apu Bagchi towards Sashi Biswas1 |
Completion of work |
-
latitude : 23.121936921961606,23.121936921961606
Longitude : 88.5237977374345,88.5237977374345
file name : Image_21032022125741984.png
|
2022-03-21 12:57:42.121922 |
330 |
61870946 |
CONSTRUCTION OF PCC ROAD FROM H/O ABADAT DAFADAR TOWARDS MASIT AT JAGPUR SANSAD NO III |
134001 |
CONSTRUCTION OF PCC ROAD FROM H/O ABADAT DAFADAR TOWARDS MASIT AT JAGPUR SANSAD NO III1 |
Plinth level |
-
latitude : 23.119945423677564,23.119945423677564
Longitude : 88.52549079805613,88.52549079805613
file name : Image_25042022133429678.png
|
2022-04-25 13:34:29.853023 |
331 |
61870946 |
CONSTRUCTION OF PCC ROAD FROM H/O ABADAT DAFADAR TOWARDS MASIT AT JAGPUR SANSAD NO III |
134001 |
CONSTRUCTION OF PCC ROAD FROM H/O ABADAT DAFADAR TOWARDS MASIT AT JAGPUR SANSAD NO III1 |
Completion of work |
-
latitude : 23.12026192434132,23.12026192434132
Longitude : 88.52524998597801,88.52524998597801
file name : Image_22042022153935554.png
|
2022-04-22 15:39:35.65577 |
332 |
48246229 |
BUILDING FOR SLWM ON GP LAND AT NIYAMATPUR |
500000 |
BUILDING FOR SLWM ON GP LAND AT NIYAMATPUR1 |
Roof laid |
-
latitude : 23.1265901774168
Longitude : 88.5272952541709
file name : Image_30082022141203684.png
|
2022-08-30 14:12:03.781011 |
333 |
48246229 |
BUILDING FOR SLWM ON GP LAND AT NIYAMATPUR |
500000 |
BUILDING FOR SLWM ON GP LAND AT NIYAMATPUR1 |
Plinth level |
-
latitude : 23.126765359193087
Longitude : 88.52731134742498
file name : Image_30082022140656111.png
|
2022-08-30 14:06:56.182147 |
334 |
48246229 |
BUILDING FOR SLWM ON GP LAND AT NIYAMATPUR |
500000 |
BUILDING FOR SLWM ON GP LAND AT NIYAMATPUR1 |
Plinth level |
-
latitude : 23.126615658402443
Longitude : 88.52743020281196
file name : Image_08062022143353581.png
|
2022-06-08 14:33:53.66523 |
335 |
48246229 |
BUILDING FOR SLWM ON GP LAND AT NIYAMATPUR |
500000 |
BUILDING FOR SLWM ON GP LAND AT NIYAMATPUR1 |
Completion of work |
-
latitude : 23.126974320039153
Longitude : 88.52767512202263
file name : Image_01042022122334951.png
|
2022-04-01 12:23:35.099374 |
336 |
48156012 |
CONSTRUCTION OF PCC ROAD FROM H/O SUKUMAR SUTRADHAR TOWARDS H/O SHAMBHUNATH KUNDU AT SANSAD NO XV |
253000 |
CONSTRUCTION OF PCC ROAD FROM H/O SUKUMAR SUTRADHAR TOWARDS H/O SHAMBHUNATH KUNDU AT SANSAD NO XV1 |
Roof laid |
-
latitude : 23.118575401604176,23.118575401604176
Longitude : 88.54025015607476,88.54025015607476
file name : Image_15062022123053806.png
|
2022-06-15 12:30:53.861372 |
337 |
48156012 |
CONSTRUCTION OF PCC ROAD FROM H/O SUKUMAR SUTRADHAR TOWARDS H/O SHAMBHUNATH KUNDU AT SANSAD NO XV |
253000 |
CONSTRUCTION OF PCC ROAD FROM H/O SUKUMAR SUTRADHAR TOWARDS H/O SHAMBHUNATH KUNDU AT SANSAD NO XV1 |
Plinth level |
-
latitude : 23.132375618442893,23.132375618442893
Longitude : 88.54738240130246,88.54738240130246
file name : Image_14062022115157992.png
|
2022-06-14 11:51:58.088655 |
338 |
48156012 |
CONSTRUCTION OF PCC ROAD FROM H/O SUKUMAR SUTRADHAR TOWARDS H/O SHAMBHUNATH KUNDU AT SANSAD NO XV |
253000 |
CONSTRUCTION OF PCC ROAD FROM H/O SUKUMAR SUTRADHAR TOWARDS H/O SHAMBHUNATH KUNDU AT SANSAD NO XV1 |
Completion of work |
-
latitude : 23.132316,23.1323377
Longitude : 88.5466162,88.5467764
file name : Image_26042022133530649.png
|
2022-04-26 13:35:30.732973 |
339 |
47983806 |
Construction of Concreat road from h/o Bappi Karmakar towards Parniyamatpur Football ground at I |
160000 |
Construction of Concreat road from h/o Bappi Karmakar towards Parniyamatpur Football ground at I1 |
Roof laid |
-
latitude : 23.12986662145704,23.12986662145704
Longitude : 88.51212627254426,88.51212627254426
file name : Image_10052022092705803.png
|
2022-05-10 09:27:05.893584 |
340 |
47983806 |
Construction of Concreat road from h/o Bappi Karmakar towards Parniyamatpur Football ground at I |
160000 |
Construction of Concreat road from h/o Bappi Karmakar towards Parniyamatpur Football ground at I1 |
Plinth level |
-
latitude : 23.1303469883278,23.130343509837985
Longitude : 88.51185821928084,88.51190473884344
file name : Image_22042022150937599.png
|
2022-04-22 15:09:37.703711 |
341 |
47983806 |
Construction of Concreat road from h/o Bappi Karmakar towards Parniyamatpur Football ground at I |
160000 |
Construction of Concreat road from h/o Bappi Karmakar towards Parniyamatpur Football ground at I1 |
Completion of work |
-
latitude : 23.130583316087723,23.130570324137807
Longitude : 88.51171078160405,88.51171161979437
file name : Image_20042022124723735.png
|
2022-04-20 12:47:23.876951 |
342 |
48529816 |
PURCHASE OF TWO WASTE MATERIAL |
400000 |
PURCHASE OF TWO WASTE MATERIAL 1 |
Roof laid |
-
latitude : 23.1288431
Longitude : 88.535768
file name : Image_07042022152119705.png
|
2022-04-07 15:21:19.830935 |
343 |
48529816 |
PURCHASE OF TWO WASTE MATERIAL |
400000 |
PURCHASE OF TWO WASTE MATERIAL 1 |
Plinth level |
-
latitude : 23.1288416
Longitude : 88.5358227
file name : Image_07042022151919356.png
|
2022-04-07 15:19:19.47625 |
344 |
48529816 |
PURCHASE OF TWO WASTE MATERIAL |
400000 |
PURCHASE OF TWO WASTE MATERIAL 1 |
Completion of work |
-
latitude : 23.1288399
Longitude : 88.5358459
file name : Image_07042022151640200.png
|
2022-04-07 15:16:40.338192 |
345 |
69499379 |
CONSTRUCTION OF PCC ROAD FROM H/O BIPUL BISWAS TOWARDS H/O SUKUMAR DAS AT PRITINAGAR XIX, 42 |
138026 |
CONSTRUCTION OF PCC ROAD FROM H/O BIPUL BISWAS TOWARDS H/O SUKUMAR DAS AT PRITINAGAR XIX, 421 |
Roof laid |
-
latitude : 23.1359444,23.1359444,23.136120862327516
Longitude : 88.5403568,88.5403568,88.540433133021
file name : Image_22062023123156564.png
|
2023-06-22 12:31:56.672352 |
346 |
69499379 |
CONSTRUCTION OF PCC ROAD FROM H/O BIPUL BISWAS TOWARDS H/O SUKUMAR DAS AT PRITINAGAR XIX, 42 |
138026 |
CONSTRUCTION OF PCC ROAD FROM H/O BIPUL BISWAS TOWARDS H/O SUKUMAR DAS AT PRITINAGAR XIX, 421 |
Plinth level |
-
latitude : 23.13637466635555,23.13637466635555
Longitude : 88.54086806997657,88.54086806997657
file name : Image_21062023112340176.png
|
2023-06-21 11:23:40.279095 |
347 |
69499379 |
CONSTRUCTION OF PCC ROAD FROM H/O BIPUL BISWAS TOWARDS H/O SUKUMAR DAS AT PRITINAGAR XIX, 42 |
138026 |
CONSTRUCTION OF PCC ROAD FROM H/O BIPUL BISWAS TOWARDS H/O SUKUMAR DAS AT PRITINAGAR XIX, 421 |
Completion of work |
-
latitude : 23.1359433,23.1359433
Longitude : 88.5403298,88.5403298
file name : Image_13062023120609369.png
|
2023-06-13 12:06:09.461888 |
348 |
69502411 |
CONSTRUCTION OF PCC ROAD FROM H/O ARABINDA CHAKRABORTY TOWARDS H/O PARVEJ MIYA AT GOPALPUR XXIII50 |
157074 |
CONSTRUCTION OF PCC ROAD FROM H/O ARABINDA CHAKRABORTY TOWARDS H/O PARVEJ MIYA AT GOPALPUR XXIII501 |
Roof laid |
-
latitude : 23.135870997793972,23.135870997793972
Longitude : 88.54595001786947,88.54595001786947
file name : Image_24062023163555882.png
|
2023-06-24 16:35:55.982822 |
349 |
69502411 |
CONSTRUCTION OF PCC ROAD FROM H/O ARABINDA CHAKRABORTY TOWARDS H/O PARVEJ MIYA AT GOPALPUR XXIII50 |
157074 |
CONSTRUCTION OF PCC ROAD FROM H/O ARABINDA CHAKRABORTY TOWARDS H/O PARVEJ MIYA AT GOPALPUR XXIII501 |
Plinth level |
-
latitude : 23.136427011340857,23.136427011340857
Longitude : 88.54576620273292,88.54576620273292
file name : Image_22062023124031085.png
|
2023-06-22 12:40:31.182861 |
350 |
69502411 |
CONSTRUCTION OF PCC ROAD FROM H/O ARABINDA CHAKRABORTY TOWARDS H/O PARVEJ MIYA AT GOPALPUR XXIII50 |
157074 |
CONSTRUCTION OF PCC ROAD FROM H/O ARABINDA CHAKRABORTY TOWARDS H/O PARVEJ MIYA AT GOPALPUR XXIII501 |
Completion of work |
-
latitude : 23.134617819450796,23.134617819450796
Longitude : 88.54525515809655,88.54525515809655
file name : Image_13062023121310407.png
|
2023-06-13 12:13:10.503691 |
351 |
39071054 |
Construction of Drain from Rajib chodhury twoards Anirban Dey |
325000 |
Construction of Drain from Rajib chodhury twoards Anirban Dey 1 |
Roof laid |
-
latitude : 23.1260803,23.1261089
Longitude : 88.5487777,88.5487734
file name : Image_07042022145216099.png
|
2022-04-07 14:52:16.25112 |
352 |
39071054 |
Construction of Drain from Rajib chodhury twoards Anirban Dey |
325000 |
Construction of Drain from Rajib chodhury twoards Anirban Dey 1 |
Plinth level |
-
latitude : 23.1261411,23.1261411
Longitude : 88.54872,88.54872
file name : Image_04042022142201139.png
|
2022-04-04 14:22:01.257557 |
353 |
39071054 |
Construction of Drain from Rajib chodhury twoards Anirban Dey |
325000 |
Construction of Drain from Rajib chodhury twoards Anirban Dey 1 |
Completion of work |
-
latitude : 23.1261641,23.1261641
Longitude : 88.54874,88.54874
file name : Image_20032022103143671.png
|
2022-03-20 10:31:43.845478 |
354 |
39075977 |
Cons of Drain from Manotosh Majumder towards ho Swapan Sengupta |
325000 |
Cons of Drain from Manotosh Majumder towards ho Swapan Sengupta 1 |
Roof laid |
-
latitude : 23.1262014,23.1262014
Longitude : 88.5469567,88.5469567
file name : Image_25042022134553233.png
|
2022-04-25 13:45:53.3774 |
355 |
39075977 |
Cons of Drain from Manotosh Majumder towards ho Swapan Sengupta |
325000 |
Cons of Drain from Manotosh Majumder towards ho Swapan Sengupta 1 |
Plinth level |
-
latitude : 23.1252943,23.1252943
Longitude : 88.5469785,88.5469785
file name : Image_11042022143004564.png
|
2022-04-11 14:30:04.729246 |
356 |
39075977 |
Cons of Drain from Manotosh Majumder towards ho Swapan Sengupta |
325000 |
Cons of Drain from Manotosh Majumder towards ho Swapan Sengupta 1 |
Completion of work |
-
latitude : 23.1260547,23.1260547
Longitude : 88.5469241,88.5469241
file name : Image_19032022100937506.png
|
2022-03-19 10:09:37.609566 |
357 |
57188151 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O PRANOTOSH BISWAS TOWARDS H/O DULAL BISWAS AT SANSAD NO V |
60000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O PRANOTOSH BISWAS TOWARDS H/O DULAL BISWAS AT SANSAD NO V1 |
Roof laid |
-
latitude : 23.131391038186848,23.131391038186848
Longitude : 88.53173984214664,88.53173984214664
file name : Image_05042023142128171.png
|
2023-04-05 14:21:28.260927 |
358 |
57188151 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O PRANOTOSH BISWAS TOWARDS H/O DULAL BISWAS AT SANSAD NO V |
60000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O PRANOTOSH BISWAS TOWARDS H/O DULAL BISWAS AT SANSAD NO V1 |
Plinth level |
-
latitude : 23.1344451,23.1344451
Longitude : 88.529771,88.529771
file name : Image_04042023132012651.png
|
2023-04-04 13:20:12.771336 |
359 |
57188151 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O PRANOTOSH BISWAS TOWARDS H/O DULAL BISWAS AT SANSAD NO V |
60000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O PRANOTOSH BISWAS TOWARDS H/O DULAL BISWAS AT SANSAD NO V1 |
Completion of work |
-
latitude : 23.130734022706747,23.130734022706747
Longitude : 88.53340272791684,88.53340272791684
file name : Image_23032023163035459.png
|
2023-03-23 16:30:35.551139 |
360 |
48178574 |
CONSTRUCTION OF PCC ROAD FROM H/O GOPALPUR PALLY UNNAYAN SAMITY TOWARDS H/O SUKUMAR CHANDA AT XXIV |
175000 |
CONSTRUCTION OF PCC ROAD FROM H/O GOPALPUR PALLY UNNAYAN SAMITY TOWARDS H/O SUKUMAR CHANDA AT XXIV1 |
Roof laid |
-
latitude : 23.1331862,23.1331862
Longitude : 88.5451454,88.5451454
file name : Image_16112022142117035.png
|
2022-11-16 14:21:17.114687 |
361 |
48178574 |
CONSTRUCTION OF PCC ROAD FROM H/O GOPALPUR PALLY UNNAYAN SAMITY TOWARDS H/O SUKUMAR CHANDA AT XXIV |
175000 |
CONSTRUCTION OF PCC ROAD FROM H/O GOPALPUR PALLY UNNAYAN SAMITY TOWARDS H/O SUKUMAR CHANDA AT XXIV1 |
Plinth level |
-
latitude : 23.133157,23.133157
Longitude : 88.5451917,88.5451917
file name : Image_10112022105610275.png
|
2022-11-10 10:56:10.37717 |
362 |
48178574 |
CONSTRUCTION OF PCC ROAD FROM H/O GOPALPUR PALLY UNNAYAN SAMITY TOWARDS H/O SUKUMAR CHANDA AT XXIV |
175000 |
CONSTRUCTION OF PCC ROAD FROM H/O GOPALPUR PALLY UNNAYAN SAMITY TOWARDS H/O SUKUMAR CHANDA AT XXIV1 |
Completion of work |
-
latitude : 23.1331178,23.1331178
Longitude : 88.5452612,88.5452612
file name : Image_04112022120914213.png
|
2022-11-04 12:09:14.264798 |
363 |
67643352 |
Drainage Construction |
360000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.1307626
Longitude : 88.5462833
file name : Image_28032024110340503.png
|
2024-03-28 11:03:40.557321 |
364 |
67643352 |
Drainage Construction |
360000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.1310341
Longitude : 88.5466377
file name : Image_26032024105259505.png
|
2024-03-26 10:52:59.558703 |
365 |
67643352 |
Drainage Construction |
360000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.131229057908058
Longitude : 88.54630524292588
file name : Image_27022024124830576.png
|
2024-02-27 12:48:30.642324 |
366 |
57386621 |
CONST OF PUCCA DRAIN WITH SWAKPIT FROM SWARNALATA SISHU UDDAN TOWARDS HOUSE OF JOYDEB DUTTA VIII |
350000 |
CONST OF PUCCA DRAIN WITH SWAKPIT FROM SWARNALATA SISHU UDDAN TOWARDS HOUSE OF JOYDEB DUTTA VIII1 |
Roof laid |
-
latitude : 23.1290492,23.1290492
Longitude : 88.5430345,88.5430345
file name : Image_07082023132400584.png
|
2023-08-07 13:24:00.671413 |
367 |
57386621 |
CONST OF PUCCA DRAIN WITH SWAKPIT FROM SWARNALATA SISHU UDDAN TOWARDS HOUSE OF JOYDEB DUTTA VIII |
350000 |
CONST OF PUCCA DRAIN WITH SWAKPIT FROM SWARNALATA SISHU UDDAN TOWARDS HOUSE OF JOYDEB DUTTA VIII1 |
Plinth level |
-
latitude : 23.1290247,23.1290247
Longitude : 88.5431214,88.5431214
file name : Image_06082023121806310.png
|
2023-08-06 12:18:06.400069 |
368 |
57386621 |
CONST OF PUCCA DRAIN WITH SWAKPIT FROM SWARNALATA SISHU UDDAN TOWARDS HOUSE OF JOYDEB DUTTA VIII |
350000 |
CONST OF PUCCA DRAIN WITH SWAKPIT FROM SWARNALATA SISHU UDDAN TOWARDS HOUSE OF JOYDEB DUTTA VIII1 |
Completion of work |
-
latitude : 23.1269405,23.1269405
Longitude : 88.543055,88.543055
file name : Image_05082023163315856.png
|
2023-08-05 16:33:15.955065 |
369 |
67288080 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O BANAMALI BISWAS TOWARDS H/O KRISHNA MUHURI AT PARNIYAMATPUR |
193382 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O BANAMALI BISWAS TOWARDS H/O KRISHNA MUHURI AT PARNIYAMATPUR1 |
Roof laid |
-
latitude : 23.128956053406,23.128956053406
Longitude : 88.51549596525729,88.51549596525729
file name : Image_29032023140951852.png
|
2023-03-29 14:09:51.970402 |
370 |
67288080 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O BANAMALI BISWAS TOWARDS H/O KRISHNA MUHURI AT PARNIYAMATPUR |
193382 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O BANAMALI BISWAS TOWARDS H/O KRISHNA MUHURI AT PARNIYAMATPUR1 |
Plinth level |
-
latitude : 23.129653721116483,23.129653721116483
Longitude : 88.54463011957705,88.54463011957705
file name : Image_24032023172016651.png
|
2023-03-24 17:20:16.737602 |
371 |
67288080 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O BANAMALI BISWAS TOWARDS H/O KRISHNA MUHURI AT PARNIYAMATPUR |
193382 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O BANAMALI BISWAS TOWARDS H/O KRISHNA MUHURI AT PARNIYAMATPUR1 |
Completion of work |
-
latitude : 23.128895284608006,23.128895284608006
Longitude : 88.51563946343958,88.51563946343958
file name : Image_22032023123542915.png
|
2023-03-22 12:35:43.003805 |
372 |
69494951 |
CONSTRUCTION OF PCC ROAD FROM H/O BHABANI SARKAR TOWARDS H/O MRINAL DEY AT NATUNGOPALPURSANSADXV 33 |
253117 |
CONSTRUCTION OF PCC ROAD FROM H/O BHABANI SARKAR TOWARDS H/O MRINAL DEY AT NATUNGOPALPURSANSADXV 331 |
Roof laid |
-
latitude : 23.131619,23.131619
Longitude : 88.5495047,88.5495047
file name : Image_04072023174924780.png
|
2023-07-04 17:49:24.871916 |
373 |
69494951 |
CONSTRUCTION OF PCC ROAD FROM H/O BHABANI SARKAR TOWARDS H/O MRINAL DEY AT NATUNGOPALPURSANSADXV 33 |
253117 |
CONSTRUCTION OF PCC ROAD FROM H/O BHABANI SARKAR TOWARDS H/O MRINAL DEY AT NATUNGOPALPURSANSADXV 331 |
Plinth level |
-
latitude : 23.1314693,23.1314693
Longitude : 88.5495549,88.5495549
file name : Image_27062023104919006.png
|
2023-06-27 10:49:19.096877 |
374 |
69494951 |
CONSTRUCTION OF PCC ROAD FROM H/O BHABANI SARKAR TOWARDS H/O MRINAL DEY AT NATUNGOPALPURSANSADXV 33 |
253117 |
CONSTRUCTION OF PCC ROAD FROM H/O BHABANI SARKAR TOWARDS H/O MRINAL DEY AT NATUNGOPALPURSANSADXV 331 |
Completion of work |
-
latitude : 23.1316866,23.1316866
Longitude : 88.5495113,88.5495113
file name : Image_14062023150044633.png
|
2023-06-14 15:00:44.735919 |
375 |
57192633 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O NIRA BISWAS TOWARDS H/O PROMILA BISWAS AT SANSAD NO VI |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O NIRA BISWAS TOWARDS H/O PROMILA BISWAS AT SANSAD NO VI1 |
Roof laid |
-
latitude : 23.12807654030621,23.12807654030621
Longitude : 88.53652398101985,88.53652398101985
file name : Image_29032023143757826.png
|
2023-03-29 14:37:58.378958 |
376 |
57192633 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O NIRA BISWAS TOWARDS H/O PROMILA BISWAS AT SANSAD NO VI |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O NIRA BISWAS TOWARDS H/O PROMILA BISWAS AT SANSAD NO VI1 |
Plinth level |
-
latitude : 23.127117776311934,23.127117776311934
Longitude : 88.537433501333,88.537433501333
file name : Image_27032023135040287.png
|
2023-03-27 13:50:40.384036 |
377 |
57192633 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O NIRA BISWAS TOWARDS H/O PROMILA BISWAS AT SANSAD NO VI |
100000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O NIRA BISWAS TOWARDS H/O PROMILA BISWAS AT SANSAD NO VI1 |
Completion of work |
-
latitude : 23.12712754122913,23.12712754122913
Longitude : 88.53744557127357,88.53744557127357
file name : Image_22032023131428888.png
|
2023-03-22 13:14:28.992066 |
378 |
57191157 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O ALHADI SARKAR TOWARDS H/O DINABONDHU HALDAR AT SANSAD NO VI |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O ALHADI SARKAR TOWARDS H/O DINABONDHU HALDAR AT SANSAD NO VI1 |
Roof laid |
-
latitude : 23.1285338,23.1285338
Longitude : 88.5362493,88.5362493
file name : Image_29032023143335695.png
|
2023-03-29 14:33:35.95274 |
379 |
57191157 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O ALHADI SARKAR TOWARDS H/O DINABONDHU HALDAR AT SANSAD NO VI |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O ALHADI SARKAR TOWARDS H/O DINABONDHU HALDAR AT SANSAD NO VI1 |
Plinth level |
-
latitude : 23.1285332,23.1285332
Longitude : 88.5362493,88.5362493
file name : Image_27032023134037913.png
|
2023-03-27 13:40:38.008136 |
380 |
57191157 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O ALHADI SARKAR TOWARDS H/O DINABONDHU HALDAR AT SANSAD NO VI |
75000 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O ALHADI SARKAR TOWARDS H/O DINABONDHU HALDAR AT SANSAD NO VI1 |
Completion of work |
-
latitude : 23.128824,23.128824
Longitude : 88.53599,88.53599
file name : Image_22032023130343073.png
|
2023-03-22 13:03:43.167615 |
381 |
67286844 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O SUFAL MONDAL TOWARDS H/O JOYDEB MONDAL AT PARNIAMATPUR |
203485 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O SUFAL MONDAL TOWARDS H/O JOYDEB MONDAL AT PARNIAMATPUR 1 |
Roof laid |
-
latitude : 23.1325722,23.1325722
Longitude : 88.5168079,88.5168079
file name : Image_29032023141342198.png
|
2023-03-29 14:13:42.295062 |
382 |
67286844 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O SUFAL MONDAL TOWARDS H/O JOYDEB MONDAL AT PARNIAMATPUR |
203485 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O SUFAL MONDAL TOWARDS H/O JOYDEB MONDAL AT PARNIAMATPUR 1 |
Plinth level |
-
latitude : 23.1325721,23.1325721
Longitude : 88.5168079,88.5168079
file name : Image_25032023120006972.png
|
2023-03-25 12:00:07.074676 |
383 |
67286844 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O SUFAL MONDAL TOWARDS H/O JOYDEB MONDAL AT PARNIAMATPUR |
203485 |
CONSTRUCTION OF CONCRETE ROAD FROM H/O SUFAL MONDAL TOWARDS H/O JOYDEB MONDAL AT PARNIAMATPUR 1 |
Completion of work |
-
latitude : 23.132619,23.132619
Longitude : 88.5168272,88.5168272
file name : Image_22032023124928531.png
|
2023-03-22 12:49:28.623814 |
384 |
67519523 |
Construction of roads |
160000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.1303123,23.1303123
Longitude : 88.5479872,88.5479872
file name : Image_02012024130054525.png
|
2024-01-02 13:00:54.629677 |
385 |
67519523 |
Construction of roads |
160000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1302955,23.1302955
Longitude : 88.5480652,88.5480652
file name : Image_31122023112644191.png
|
2023-12-31 11:26:44.263126 |
386 |
67519523 |
Construction of roads |
160000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.1299179,23.1299179
Longitude : 88.547758,88.547758
file name : Image_27122023120304975.png
|
2023-12-27 12:03:05.045587 |
387 |
67519815 |
Construction of roads |
190000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.1305484,23.13592221122235
Longitude : 88.5400663,88.54236708953977
file name : Image_03012024153950705.png
|
2024-01-03 15:39:50.755294 |
388 |
67519815 |
Construction of roads |
190000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1296763,23.1296763
Longitude : 88.5456097,88.5456097
file name : Image_02012024132203023.png
|
2024-01-02 13:22:03.104775 |
389 |
67519815 |
Construction of roads |
190000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.1296748,23.1296748
Longitude : 88.5456095,88.5456095
file name : Image_02012024124621419.png
|
2024-01-02 12:46:21.483989 |
390 |
67519815 |
Construction of roads |
190000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.1368706,23.1368706
Longitude : 88.542482,88.542482
file name : Image_01012024121149542.png
|
2024-01-01 12:11:49.59367 |
391 |
67519305 |
Construction of roads |
190000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.1178023,23.1178023
Longitude : 88.5437608,88.5437608
file name : Image_04012024130738599.png
|
2024-01-04 13:07:38.661399 |
392 |
67519305 |
Construction of roads |
190000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1168898,23.1168898
Longitude : 88.5447418,88.5447418
file name : Image_31122023113619271.png
|
2023-12-31 11:36:19.332813 |
393 |
67519305 |
Construction of roads |
190000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.1178274,23.1178274
Longitude : 88.5437769,88.5437769
file name : Image_26122023164408869.png
|
2023-12-26 16:44:08.924671 |
394 |
67519094 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.1222708,23.1222708
Longitude : 88.5408739,88.5408739
file name : Image_29122023113134157.png
|
2023-12-29 11:31:34.209457 |
395 |
67519094 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1222585,23.1222585
Longitude : 88.5409382,88.5409382
file name : Image_28122023120334672.png
|
2023-12-28 12:03:34.739189 |
396 |
67519094 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.12204190529883,23.12204190529883
Longitude : 88.5408472828567,88.5408472828567
file name : Image_27122023090924244.png
|
2023-12-27 09:09:24.316517 |
397 |
67518618 |
Construction of roads |
190000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.1278845,23.1278845
Longitude : 88.5316856,88.5316856
file name : Image_29122023154452466.png
|
2023-12-29 15:44:52.516245 |
398 |
67518618 |
Construction of roads |
190000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1278816,23.1278816
Longitude : 88.5316793,88.5316793
file name : Image_29122023115433146.png
|
2023-12-29 11:54:33.189527 |
399 |
67518618 |
Construction of roads |
190000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.1279567,23.1279567
Longitude : 88.5316784,88.5316784
file name : Image_26122023161619779.png
|
2023-12-26 16:16:19.840813 |
400 |
67511170 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.125243918038905,23.125243918038905
Longitude : 88.53543433360755,88.53543433360755
file name : Image_04012024125219764.png
|
2024-01-04 12:52:19.81748 |
401 |
67511170 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1269427,23.1269427
Longitude : 88.5355569,88.5355569
file name : Image_29122023153753543.png
|
2023-12-29 15:37:53.59405 |
402 |
67511170 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.121485975570977,23.121485975570977
Longitude : 88.52378332056105,88.52378332056105
file name : Image_28122023135259552.png
|
2023-12-28 13:52:59.605945 |
403 |
67509552 |
Construction of roads |
272000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.1277439,23.1277439
Longitude : 88.5259092,88.5259092
file name : Image_08012024125208310.png
|
2024-01-08 12:52:08.413714 |
404 |
67509552 |
Construction of roads |
272000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1277667,23.1277667
Longitude : 88.5259471,88.5259471
file name : Image_08012024120152882.png
|
2024-01-08 12:01:53.06579 |
405 |
67509552 |
Construction of roads |
272000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.1280885,23.1280885
Longitude : 88.5254385,88.5254385
file name : Image_27122023135513690.png
|
2023-12-27 13:55:13.746369 |
406 |
67496825 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.121624612249434,23.121624612249434
Longitude : 88.52383034303784,88.52383034303784
file name : Image_29122023120305331.png
|
2023-12-29 12:03:05.387041 |
407 |
67496825 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.121637771837413,23.121637771837413
Longitude : 88.52379891090095,88.52379891090095
file name : Image_28122023131524543.png
|
2023-12-28 13:15:24.617475 |
408 |
67496825 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.1279567,23.1279567
Longitude : 88.5316784,88.5316784
file name : Image_26122023161634174.png
|
2023-12-26 16:16:34.233472 |
409 |
57361006 |
CONSTRUCTION OF BT ROAD FROM H/O KALYAN BHOWMIK TOWARDS H/O GANESH MUKHERJEE AT SANSAD NO XII |
250000 |
CONSTRUCTION OF BT ROAD FROM H/O KALYAN BHOWMIK TOWARDS H/O GANESH MUKHERJEE AT SANSAD NO XII1 |
Roof laid |
-
latitude : 23.1277432,23.1277432
Longitude : 88.5259098,88.5259098
file name : Image_08012024130209171.png
|
2024-01-08 13:02:09.314692 |
410 |
57361006 |
CONSTRUCTION OF BT ROAD FROM H/O KALYAN BHOWMIK TOWARDS H/O GANESH MUKHERJEE AT SANSAD NO XII |
250000 |
CONSTRUCTION OF BT ROAD FROM H/O KALYAN BHOWMIK TOWARDS H/O GANESH MUKHERJEE AT SANSAD NO XII1 |
Plinth level |
-
latitude : 23.1235805,23.1235805
Longitude : 88.544537,88.544537
file name : Image_05012024134341658.png
|
2024-01-05 13:43:41.714689 |
411 |
57361006 |
CONSTRUCTION OF BT ROAD FROM H/O KALYAN BHOWMIK TOWARDS H/O GANESH MUKHERJEE AT SANSAD NO XII |
250000 |
CONSTRUCTION OF BT ROAD FROM H/O KALYAN BHOWMIK TOWARDS H/O GANESH MUKHERJEE AT SANSAD NO XII1 |
Completion of work |
-
latitude : 23.1296991,23.1296991
Longitude : 88.5458074,88.5458074
file name : Image_04012024130150515.png
|
2024-01-04 13:01:50.568379 |
412 |
81046746 |
Creation of a new source of drinking water |
700000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.126933961175382
Longitude : 88.52744445204735
file name : Image_21022024171513839.png
|
2024-02-21 17:15:13.805966 |
413 |
81046746 |
Creation of a new source of drinking water |
700000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.126895278692245
Longitude : 88.527403883636
file name : Image_16022024115712548.png
|
2024-02-16 11:57:12.620601 |
414 |
81046746 |
Creation of a new source of drinking water |
700000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.13151810783893
Longitude : 88.536207228899
file name : Image_09012024135155779.png
|
2024-01-09 13:51:55.839128 |
415 |
80979164 |
Creation of drainage channel for management of grey water |
280000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.1286592
Longitude : 88.5452511
file name : Image_13122023165215989.png
|
2023-12-13 16:52:16.057367 |
416 |
80979164 |
Creation of drainage channel for management of grey water |
280000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.1201443
Longitude : 88.5460148
file name : Image_31102023163521231.png
|
2023-10-31 16:35:21.346313 |
417 |
80979164 |
Creation of drainage channel for management of grey water |
280000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.1193955
Longitude : 88.5458884
file name : Image_28092023113443757.png
|
2023-09-28 11:34:43.835344 |
418 |
80979164 |
Creation of drainage channel for management of grey water |
280000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.1201337
Longitude : 88.5460272
file name : Image_12092023131346921.png
|
2023-09-12 13:13:47.011809 |
419 |
80984520 |
Improvment of own land office building premises at Niyamatpur sansad no IV |
220000 |
Improvment of own land office building premises at Niyamatpur sansad no IV1 |
Roof laid |
-
latitude : 23.12692285515368
Longitude : 88.52741670794785
file name : Image_07082023095819392.png
|
2023-08-07 09:58:19.491492 |
420 |
80984520 |
Improvment of own land office building premises at Niyamatpur sansad no IV |
220000 |
Improvment of own land office building premises at Niyamatpur sansad no IV1 |
Plinth level |
-
latitude : 23.126551075838506
Longitude : 88.52728905156255
file name : Image_06082023123603885.png
|
2023-08-06 12:36:04.005944 |
421 |
80984520 |
Improvment of own land office building premises at Niyamatpur sansad no IV |
220000 |
Improvment of own land office building premises at Niyamatpur sansad no IV1 |
Completion of work |
-
latitude : 23.126724413596094
Longitude : 88.52730707265437
file name : Image_05082023154555908.png
|
2023-08-05 15:45:56.030029 |
422 |
80984003 |
Construction of own land office building boundary wall for protection and strengthing of wall at IV |
262000 |
Construction of own land office building boundary wall for protection and strengthing of wall at IV1 |
Roof laid |
-
latitude : 23.126945947296917
Longitude : 88.52745518088341
file name : Image_07082023095725499.png
|
2023-08-07 09:57:25.59064 |
423 |
80984003 |
Construction of own land office building boundary wall for protection and strengthing of wall at IV |
262000 |
Construction of own land office building boundary wall for protection and strengthing of wall at IV1 |
Plinth level |
-
latitude : 23.126525888219476
Longitude : 88.5273261833936
file name : Image_06082023123524728.png
|
2023-08-06 12:35:24.813047 |
424 |
80984003 |
Construction of own land office building boundary wall for protection and strengthing of wall at IV |
262000 |
Construction of own land office building boundary wall for protection and strengthing of wall at IV1 |
Completion of work |
-
latitude : 23.12671594787389
Longitude : 88.52737328968942
file name : Image_05082023154434602.png
|
2023-08-05 15:44:34.730513 |
425 |
67520471 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.134777,23.134777,23.134449091739953
Longitude : 88.546318,88.546318,88.5468100849539
file name : Image_01042024123759654.png
|
2024-04-01 12:37:59.716377 |
426 |
67520471 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1346269,23.1345953
Longitude : 88.5464762,88.5464298
file name : Image_28032024124233407.png
|
2024-03-28 12:42:33.468725 |
427 |
67520471 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.133362671360373,23.134005311876535
Longitude : 88.54310519993305,88.54529740288854
file name : Image_19032024123156351.png
|
2024-03-19 12:31:56.427922 |
428 |
67520616 |
Repairing and maintenance of roads |
250000 |
CONSTRUCTION OF PCC ROAD FROM H/O KHOKAN BOSE TOWARDS H/O GOBINDA GHOSH SANSAD 24 |
Roof laid |
-
latitude : 23.1307898,23.1307898
Longitude : 88.5462047,88.5462047
file name : Image_08042024121309631.png
|
2024-04-08 12:13:09.811561 |
429 |
67520616 |
Repairing and maintenance of roads |
250000 |
CONSTRUCTION OF PCC ROAD FROM H/O KHOKAN BOSE TOWARDS H/O GOBINDA GHOSH SANSAD 24 |
Plinth level |
-
latitude : 23.1312394,23.1312394,23.1313124
Longitude : 88.54588,88.54588,88.5457382
file name : Image_05042024115652407.png
|
2024-04-05 11:56:52.471501 |
430 |
67520616 |
Repairing and maintenance of roads |
250000 |
CONSTRUCTION OF PCC ROAD FROM H/O KHOKAN BOSE TOWARDS H/O GOBINDA GHOSH SANSAD 24 |
Completion of work |
-
latitude : 23.1308057,23.1308057
Longitude : 88.5463031,88.5463031
file name : Image_18032024142732402.png
|
2024-03-18 14:27:32.455787 |
431 |
67520525 |
Construction of roads |
187000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.14278325997293,23.14278325997293
Longitude : 88.54327124543488,88.54327124543488
file name : Image_22032024171239789.png
|
2024-03-22 17:12:39.848659 |
432 |
67520525 |
Construction of roads |
187000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.142790719866753,23.142790719866753
Longitude : 88.54363183490932,88.54363183490932
file name : Image_22032024143312561.png
|
2024-03-22 14:33:12.646727 |
433 |
67520525 |
Construction of roads |
187000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.14256248064339,23.14256248064339
Longitude : 88.54325942695141,88.54325942695141
file name : Image_13032024135954036.png
|
2024-03-13 13:59:52.833336 |
434 |
67520111 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.1307669,23.1307669
Longitude : 88.5462797,88.5462797
file name : Image_28032024110747327.png
|
2024-03-28 11:07:47.403819 |
435 |
67520111 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1322591,23.1322591
Longitude : 88.5417031,88.5417031
file name : Image_22032024113909612.png
|
2024-03-22 11:39:09.678664 |
436 |
67520111 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.1322607,23.1322607
Longitude : 88.5417005,88.5417005
file name : Image_18032024142152841.png
|
2024-03-18 14:21:52.900112 |
437 |
67519753 |
Construction of roads |
125000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.124603,23.124603
Longitude : 88.5485903,88.5485903
file name : Image_19032024145953428.png
|
2024-03-19 14:59:53.4758 |
438 |
67519753 |
Construction of roads |
125000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1246082,23.1246082
Longitude : 88.5485917,88.5485917
file name : Image_18032024144233216.png
|
2024-03-18 14:42:33.27484 |
439 |
67519753 |
Construction of roads |
125000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.124675,23.124675
Longitude : 88.5485862,88.5485862
file name : Image_17032024140336891.png
|
2024-03-17 14:03:36.951942 |
440 |
67519700 |
Construction of roads |
122000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.1243225,23.1243225
Longitude : 88.5475789,88.5475789
file name : Image_19032024143646206.png
|
2024-03-19 14:36:46.264854 |
441 |
67519700 |
Construction of roads |
122000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1246618,23.1246618
Longitude : 88.5465879,88.5465879
file name : Image_19032024120744350.png
|
2024-03-19 12:07:44.44492 |
442 |
67519700 |
Construction of roads |
122000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.1246863,23.1246863
Longitude : 88.5466698,88.5466698
file name : Image_18032024131048934.png
|
2024-03-18 13:10:48.995105 |
443 |
67519396 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.1184505,23.1184505
Longitude : 88.5458253,88.5458253
file name : Image_19032024143230513.png
|
2024-03-19 14:32:30.560189 |
444 |
67519396 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1184042,23.1184042
Longitude : 88.5459422,88.5459422
file name : Image_19032024121108504.png
|
2024-03-19 12:11:08.714516 |
445 |
67519396 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.1184777,23.1184777
Longitude : 88.5457201,88.5457201
file name : Image_18032024143455823.png
|
2024-03-18 14:34:55.879243 |
446 |
67518945 |
Construction of roads |
186000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.1291973,23.1291973
Longitude : 88.5433203,88.5433203
file name : Image_14042024131212105.png
|
2024-04-14 13:12:12.165017 |
447 |
67518945 |
Construction of roads |
186000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1284301,23.1284301
Longitude : 88.5433417,88.5433417
file name : Image_12042024150837648.png
|
2024-04-12 15:08:37.704936 |
448 |
67518945 |
Construction of roads |
186000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.1284236,23.1284236
Longitude : 88.5438777,88.5438777
file name : Image_02042024132642260.png
|
2024-04-02 13:26:42.319529 |
449 |
67510461 |
Construction of roads |
192000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.130890680477023,23.13089143484831
Longitude : 88.535644300282,88.53564254008234
file name : Image_28032024113313403.png
|
2024-03-28 11:33:13.460515 |
450 |
67510461 |
Construction of roads |
192000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.131350595504045,23.131350595504045
Longitude : 88.53567422367632,88.53567422367632
file name : Image_27032024123133588.png
|
2024-03-27 12:31:33.659339 |
451 |
67510461 |
Construction of roads |
192000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.1310158,23.1310158
Longitude : 88.5344151,88.5344151
file name : Image_19032024123938487.png
|
2024-03-19 12:39:38.619629 |
452 |
67510693 |
Repairing and maintenance of roads |
200000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 23.1288152,23.1288152
Longitude : 88.5376395,88.5376395
file name : Image_12082024170331219.png
|
2024-08-12 17:03:31.27503 |
453 |
67510693 |
Repairing and maintenance of roads |
200000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 23.1288303,23.1288303
Longitude : 88.5359215,88.5359215
file name : Image_12082024170124113.png
|
2024-08-12 17:01:24.172817 |
454 |
67519656 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.1291189,23.1291189
Longitude : 88.5503531,88.5503531
file name : Image_28032024130221667.png
|
2024-03-28 13:02:21.732512 |
455 |
67519656 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1291544,23.1291544
Longitude : 88.5503297,88.5503297
file name : Image_28032024125917496.png
|
2024-03-28 12:59:17.569312 |
456 |
67519656 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.1291693,23.1291693
Longitude : 88.5503021,88.5503021
file name : Image_21032024140322103.png
|
2024-03-21 14:03:22.170399 |
457 |
80981176 |
Creation of a new source of drinking water |
40000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.129429086111486
Longitude : 88.5451366379857
file name : Image_24052024123519380.png
|
2024-05-24 12:35:19.438964 |
458 |
80981585 |
Creation of a new source of drinking water |
40000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.126278
Longitude : 88.5440397
file name : Image_24052024124655019.png
|
2024-05-24 12:46:55.072433 |
459 |
80981974 |
Creation of a new source of drinking water |
40000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.1295439
Longitude : 88.5452039
file name : Image_24052024123211527.png
|
2024-05-24 12:32:11.588015 |
460 |
80978170 |
Creation of drainage channel for management of grey water |
260000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.1225052
Longitude : 88.5465181
file name : Image_12102023165002124.png
|
2023-10-12 16:50:02.213379 |
461 |
80978170 |
Creation of drainage channel for management of grey water |
260000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.1224376
Longitude : 88.5465024
file name : Image_28092023114458099.png
|
2023-09-28 11:44:58.194287 |
462 |
80978170 |
Creation of drainage channel for management of grey water |
260000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.1225058
Longitude : 88.5464611
file name : Image_11092023092245123.png
|
2023-09-11 09:22:45.204528 |
463 |
67638622 |
Drainage Construction |
350000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.1240036
Longitude : 88.5445807
file name : Image_03062024155549349.png
|
2024-06-03 15:55:49.401715 |
464 |
67638622 |
Drainage Construction |
350000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.1238002
Longitude : 88.5445124
file name : Image_09052024131549128.png
|
2024-05-09 13:15:49.187571 |
465 |
67638622 |
Drainage Construction |
350000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.1239967
Longitude : 88.544525
file name : Image_31032024122219363.png
|
2024-03-31 12:22:19.434263 |
466 |
67593714 |
Drinking water facilities |
1000000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 23.13585251569748
Longitude : 88.54188764467835
file name : Image_15072024132148995.png
|
2024-07-15 13:21:49.063556 |
467 |
67593714 |
Drinking water facilities |
1000000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 23.135864376090467
Longitude : 88.54209425859153
file name : Image_21062024114419250.png
|
2024-06-21 11:44:19.316572 |
468 |
67593714 |
Drinking water facilities |
1000000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 23.1364068
Longitude : 88.5424692
file name : Image_01042024135319063.png
|
2024-04-01 13:53:19.135626 |
469 |
70889485 |
Construction of toilets in public institutions |
180000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.11772053129971
Longitude : 88.54537820443511
file name : Image_23092024143247054.png
|
2024-09-23 14:32:47.104372 |
470 |
70889485 |
Construction of toilets in public institutions |
180000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.117842068895698
Longitude : 88.54544534347951
file name : Image_23092024143003157.png
|
2024-09-23 14:30:03.234866 |
471 |
89924132 |
Construction of toilets in public institutions |
188500 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.1240067
Longitude : 88.5489044
file name : Image_23092024142118561.png
|
2024-09-23 14:21:18.612276 |
472 |
89924132 |
Construction of toilets in public institutions |
188500 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.1239938
Longitude : 88.5489812
file name : Image_23092024141750138.png
|
2024-09-23 14:17:50.189214 |
473 |
89924574 |
Construction of toilets in public institutions |
188500 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.1271863
Longitude : 88.5417203
file name : Image_23092024150035220.png
|
2024-09-23 15:00:35.273032 |
474 |
89924574 |
Construction of toilets in public institutions |
188500 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.1272128
Longitude : 88.5417382
file name : Image_23092024145818480.png
|
2024-09-23 14:58:18.540043 |
475 |
89924638 |
Construction of toilets in public institutions |
188500 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.1316217
Longitude : 88.5433257
file name : Image_02122024142246217.png
|
2024-12-02 14:22:46.274082 |
476 |
89924638 |
Construction of toilets in public institutions |
188500 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.1226033
Longitude : 88.5418893
file name : Image_23092024145259117.png
|
2024-09-23 14:52:59.171243 |
477 |
89924638 |
Construction of toilets in public institutions |
188500 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.1223433
Longitude : 88.5417518
file name : Image_23092024145102984.png
|
2024-09-23 14:51:03.043822 |
478 |
89924305 |
Construction of toilets in public institutions |
188500 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.1222039
Longitude : 88.5465493
file name : Image_23092024144150328.png
|
2024-09-23 14:41:50.396849 |
479 |
89924305 |
Construction of toilets in public institutions |
188500 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.1224289
Longitude : 88.5463892
file name : Image_23092024143645947.png
|
2024-09-23 14:36:46.006923 |
480 |
80979458 |
Creation of drainage channel for management of grey water |
280000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.119388
Longitude : 88.5458693
file name : Image_02112023123829083.png
|
2023-11-02 12:38:29.174092 |
481 |
80979458 |
Creation of drainage channel for management of grey water |
280000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.119388
Longitude : 88.5458693
file name : Image_31102023163848373.png
|
2023-10-31 16:38:48.546474 |
482 |
80979458 |
Creation of drainage channel for management of grey water |
280000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.1193716
Longitude : 88.545832
file name : Image_09102023094442909.png
|
2023-10-09 09:44:43.040267 |
483 |
80979458 |
Creation of drainage channel for management of grey water |
280000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.1196135
Longitude : 88.5458555
file name : Image_12092023131919135.png
|
2023-09-12 13:19:19.229002 |
484 |
80957832 |
Creation of drainage channel for management of grey water |
260000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.1244927
Longitude : 88.5465702
file name : Image_11102023115619905.png
|
2023-10-11 11:56:19.995587 |
485 |
80957832 |
Creation of drainage channel for management of grey water |
260000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.12391
Longitude : 88.5467073
file name : Image_28092023114919110.png
|
2023-09-28 11:49:19.18626 |
486 |
80957832 |
Creation of drainage channel for management of grey water |
260000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.1243181
Longitude : 88.5464677
file name : Image_11092023091629394.png
|
2023-09-11 09:16:29.470549 |
487 |
58037934 |
CONSTRUCTION COMMUNITY TOILET ON THE LAND OF UKILNARA PALLY UNNAYAN SAMITY AT SANSAD NO V |
350000 |
CONSTRUCTION COMMUNITY TOILET ON THE LAND OF UKILNARA PALLY UNNAYAN SAMITY AT SANSAD NO V1 |
Roof laid |
-
latitude : 23.1288533
Longitude : 88.5359012
file name : Image_05082023153257825.png
|
2023-08-05 15:32:57.944292 |
488 |
58037934 |
CONSTRUCTION COMMUNITY TOILET ON THE LAND OF UKILNARA PALLY UNNAYAN SAMITY AT SANSAD NO V |
350000 |
CONSTRUCTION COMMUNITY TOILET ON THE LAND OF UKILNARA PALLY UNNAYAN SAMITY AT SANSAD NO V1 |
Plinth level |
-
latitude : 23.1288532
Longitude : 88.5359022
file name : Image_05082023152535617.png
|
2023-08-05 15:25:35.799585 |
489 |
58037934 |
CONSTRUCTION COMMUNITY TOILET ON THE LAND OF UKILNARA PALLY UNNAYAN SAMITY AT SANSAD NO V |
350000 |
CONSTRUCTION COMMUNITY TOILET ON THE LAND OF UKILNARA PALLY UNNAYAN SAMITY AT SANSAD NO V1 |
Plinth level |
-
latitude : 23.1288491
Longitude : 88.5358926
file name : Image_03082023121531221.png
|
2023-08-03 12:15:31.323052 |
490 |
58037934 |
CONSTRUCTION COMMUNITY TOILET ON THE LAND OF UKILNARA PALLY UNNAYAN SAMITY AT SANSAD NO V |
350000 |
CONSTRUCTION COMMUNITY TOILET ON THE LAND OF UKILNARA PALLY UNNAYAN SAMITY AT SANSAD NO V1 |
Completion of work |
-
latitude : 23.1288874
Longitude : 88.5357392
file name : Image_25032023122124999.png
|
2023-03-25 12:21:25.096279 |
491 |
67287285 |
CONSTRUCTION OF CONCRETE ROAD FROM JAGPUR GHOSH PARA KALIMONDIR TOWARDS POND OF GANESH BISWAS |
201067 |
CONSTRUCTION OF CONCRETE ROAD FROM JAGPUR GHOSH PARA KALIMONDIR TOWARDS POND OF GANESH BISWAS 1 |
Roof laid |
-
latitude : 23.1230753,23.1230753
Longitude : 88.523877,88.523877
file name : Image_10042023165550809.png
|
2023-04-10 16:55:50.918864 |
492 |
67287285 |
CONSTRUCTION OF CONCRETE ROAD FROM JAGPUR GHOSH PARA KALIMONDIR TOWARDS POND OF GANESH BISWAS |
201067 |
CONSTRUCTION OF CONCRETE ROAD FROM JAGPUR GHOSH PARA KALIMONDIR TOWARDS POND OF GANESH BISWAS 1 |
Plinth level |
-
latitude : 23.1230731,23.1230731
Longitude : 88.523872,88.523872
file name : Image_06042023162257933.png
|
2023-04-06 16:22:58.064741 |
493 |
67287285 |
CONSTRUCTION OF CONCRETE ROAD FROM JAGPUR GHOSH PARA KALIMONDIR TOWARDS POND OF GANESH BISWAS |
201067 |
CONSTRUCTION OF CONCRETE ROAD FROM JAGPUR GHOSH PARA KALIMONDIR TOWARDS POND OF GANESH BISWAS 1 |
Completion of work |
-
latitude : 23.12311,23.12311
Longitude : 88.5238675,88.5238675
file name : Image_23032023163621600.png
|
2023-03-23 16:36:21.693358 |
494 |
80954924 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.1326383
Longitude : 88.531887
file name : Image_29012024130104929.png
|
2024-01-29 13:01:04.991205 |
495 |
80954924 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.133215736597776
Longitude : 88.5330590698868
file name : Image_05012024133011077.png
|
2024-01-05 13:30:11.131029 |
496 |
80954924 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.13327206298709
Longitude : 88.53301950730383
file name : Image_28092023133254712.png
|
2023-09-28 13:32:54.819639 |
497 |
106777289 |
Creation of a new source of drinking water |
50000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.1316996
Longitude : 88.5434299
file name : Image_08082024115744066.png
|
2024-08-08 11:57:44.118343 |
498 |
106777017 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.1224894
Longitude : 88.5418077
file name : Image_09082024133749792.png
|
2024-08-09 13:37:49.856186 |
499 |
106777193 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.132971907034516
Longitude : 88.54315783828497
file name : Image_08082024114416174.png
|
2024-08-08 11:44:16.228125 |
500 |
106777254 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.1292464
Longitude : 88.5351468
file name : Image_08082024113539403.png
|
2024-08-08 11:35:39.469742 |
501 |
106776834 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.128724335692823
Longitude : 88.51045886054635
file name : Image_08082024111518550.png
|
2024-08-08 11:15:18.60943 |
502 |
106777146 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.137423912994564
Longitude : 88.54253933764994
file name : Image_08082024115111362.png
|
2024-08-08 11:51:11.41313 |
503 |
67519240 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.1297487,23.1297487
Longitude : 88.5460766,88.5460766
file name : Image_29122023152654746.png
|
2023-12-29 15:26:54.798396 |
504 |
67519240 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1244196,23.1244196
Longitude : 88.5447153,88.5447153
file name : Image_27122023115550959.png
|
2023-12-27 11:55:51.010013 |
505 |
67519240 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.124510920606554,23.124510920606554
Longitude : 88.54479767382145,88.54479767382145
file name : Image_26122023163555020.png
|
2023-12-26 16:35:55.081643 |
506 |
67642694 |
Drainage Construction |
350000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.1229835
Longitude : 88.5486887
file name : Image_29012024124742240.png
|
2024-01-29 12:47:42.296796 |
507 |
67642694 |
Drainage Construction |
350000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.1228793
Longitude : 88.5484783
file name : Image_20012024133250087.png
|
2024-01-20 13:32:50.148533 |
508 |
67642694 |
Drainage Construction |
350000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.1298977
Longitude : 88.5482039
file name : Image_09012024140619338.png
|
2024-01-09 14:06:19.395933 |
509 |
67638153 |
Drainage Construction |
350000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.1305251
Longitude : 88.5364421
file name : Image_21022024173729431.png
|
2024-02-21 17:37:29.526602 |
510 |
67638153 |
Drainage Construction |
350000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.131803972646594
Longitude : 88.53610622696579
file name : Image_08022024122010708.png
|
2024-02-08 12:20:10.788815 |
511 |
67638153 |
Drainage Construction |
350000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.131556874141097
Longitude : 88.5362106654793
file name : Image_09012024134535525.png
|
2024-01-09 13:45:35.586157 |
512 |
67496319 |
Construction of roads |
172000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.13164941035211,23.13164941035211
Longitude : 88.51113175973296,88.51113175973296
file name : Image_19032024124625012.png
|
2024-03-19 12:46:25.086639 |
513 |
67496319 |
Construction of roads |
172000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1328307,23.1328307
Longitude : 88.5097783,88.5097783
file name : Image_18032024140303451.png
|
2024-03-18 14:03:03.517936 |
514 |
67496319 |
Construction of roads |
172000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.131639477796853,23.131639477796853
Longitude : 88.51112941280007,88.51112941280007
file name : Image_13032024133853995.png
|
2024-03-13 13:38:54.067265 |
515 |
80956196 |
Creation of community soak pits for group of Households |
125000 |
Creation of community soak pits for group of Households1 |
Roof laid |
-
latitude : 23.129047
Longitude : 88.5451231
file name : Image_27122023084948005.png
|
2023-12-27 08:49:48.062057 |
516 |
80956196 |
Creation of community soak pits for group of Households |
125000 |
Creation of community soak pits for group of Households1 |
Plinth level |
-
latitude : 23.1287986
Longitude : 88.5451949
file name : Image_24122023105955035.png
|
2023-12-24 10:59:54.193788 |
517 |
80956196 |
Creation of community soak pits for group of Households |
125000 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 23.1288416
Longitude : 88.5452182
file name : Image_23122023102449938.png
|
2023-12-23 10:24:48.394692 |
518 |
80954251 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.1265669176355
Longitude : 88.52734747342765
file name : Image_09042024125803008.png
|
2024-04-09 12:58:03.084674 |
519 |
80954251 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.126403973437846
Longitude : 88.52731201797724
file name : Image_04042024120156596.png
|
2024-04-04 12:01:56.695225 |
520 |
80954251 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.126505352556705
Longitude : 88.52736021392047
file name : Image_09012024135317463.png
|
2024-01-09 13:53:17.538478 |
521 |
39063295 |
Improvement of Concreat road from Niranjan Sarkar towards Gokul Dutta |
162986 |
Improvement of Concreat road from Niranjan Sarkar towards Gokul Dutta1 |
Roof laid |
-
latitude : 23.1304454,23.1304454,23.1304454
Longitude : 88.5530349,88.5530349,88.5530349
file name : Image_17062021145748839.png
|
2021-06-17 14:57:49.209727 |
522 |
39063295 |
Improvement of Concreat road from Niranjan Sarkar towards Gokul Dutta |
162986 |
Improvement of Concreat road from Niranjan Sarkar towards Gokul Dutta1 |
Plinth level |
-
latitude : 23.1304454,23.130258726887405
Longitude : 88.5530349,88.55204056017101
file name : Image_17062021145540259.png
|
2021-06-17 14:55:40.629371 |
523 |
39063295 |
Improvement of Concreat road from Niranjan Sarkar towards Gokul Dutta |
162986 |
Improvement of Concreat road from Niranjan Sarkar towards Gokul Dutta1 |
Completion of work |
-
latitude : 23.130280058830976,23.130188193172216
Longitude : 88.5521460045129,88.55207651853561
file name : Image_17062021145324894.png
|
2021-06-17 14:53:25.262856 |
524 |
39056692 |
Construction of Concreat road from Jagpur Kalitala towards Madhusudan Durlav and Sudhir Durlav |
207727 |
Construction of Concreat road from Jagpur Kalitala towards Madhusudan Durlav and Sudhir Durlav 1 |
Roof laid |
-
latitude : 23.121492764912546,23.121492764912546
Longitude : 88.5263454169035,88.5263454169035
file name : Image_28012022162731450.png
|
2022-01-28 16:27:31.668713 |
525 |
39056692 |
Construction of Concreat road from Jagpur Kalitala towards Madhusudan Durlav and Sudhir Durlav |
207727 |
Construction of Concreat road from Jagpur Kalitala towards Madhusudan Durlav and Sudhir Durlav 1 |
Plinth level |
-
latitude : 23.121280493214726,23.121280493214726
Longitude : 88.52638422511518,88.52638422511518
file name : Image_13012022125332855.png
|
2022-01-13 12:53:33.000863 |
526 |
39056692 |
Construction of Concreat road from Jagpur Kalitala towards Madhusudan Durlav and Sudhir Durlav |
207727 |
Construction of Concreat road from Jagpur Kalitala towards Madhusudan Durlav and Sudhir Durlav 1 |
Completion of work |
-
latitude : 23.121353834867477,23.121361923404038
Longitude : 88.52635287679732,88.52632714435458
file name : Image_10012022141046947.png
|
2022-01-10 14:10:47.084351 |
527 |
39072012 |
Construction of Drain from House of Mukunda Roy twoards pond of Mahananda Roy |
300000 |
Construction of Drain from House of Mukunda Roy twoards pond of Mahananda Roy1 |
Roof laid |
-
latitude : 23.132345946505666,23.1178211979568
Longitude : 88.54592017829418,88.53655046783388
file name : Image_29112021150102655.png
|
2021-11-29 15:01:02.829521 |
528 |
39072012 |
Construction of Drain from House of Mukunda Roy twoards pond of Mahananda Roy |
300000 |
Construction of Drain from House of Mukunda Roy twoards pond of Mahananda Roy1 |
Plinth level |
-
latitude : 23.118235431611538,23.11822943855077
Longitude : 88.53564807213843,88.53565427474678
file name : Image_17112021091142000.png
|
2021-11-17 09:11:42.120996 |
529 |
39072012 |
Construction of Drain from House of Mukunda Roy twoards pond of Mahananda Roy |
300000 |
Construction of Drain from House of Mukunda Roy twoards pond of Mahananda Roy1 |
Completion of work |
-
latitude : 23.117835237644613,23.117847181856632
Longitude : 88.53652590885758,88.53652414865792
file name : Image_07112021132828704.png
|
2021-11-07 13:28:28.824651 |
530 |
39063237 |
Improvement of Concreat road from Sima Das towards Subal Sanynal |
102563 |
Improvement of Concreat road from Sima Das towards Subal Sanynal1 |
Roof laid |
-
latitude : 23.1327588,23.1327579
Longitude : 88.5495719,88.5495742
file name : Image_17062021150934215.png
|
2021-06-17 15:09:34.560335 |
531 |
39063237 |
Improvement of Concreat road from Sima Das towards Subal Sanynal |
102563 |
Improvement of Concreat road from Sima Das towards Subal Sanynal1 |
Plinth level |
-
latitude : 23.1327584,23.1327585
Longitude : 88.5495696,88.5495761
file name : Image_17062021150738708.png
|
2021-06-17 15:07:39.057448 |
532 |
39063237 |
Improvement of Concreat road from Sima Das towards Subal Sanynal |
102563 |
Improvement of Concreat road from Sima Das towards Subal Sanynal1 |
Completion of work |
-
latitude : 23.1327591,23.1327594
Longitude : 88.549577,88.5495773
file name : Image_17062021150551025.png
|
2021-06-17 15:05:51.375923 |
533 |
39066753 |
Improvement of concreat road fromhouse Bachu Biswas towards house of Arik Biswas |
125413 |
Improvement of concreat road fromhouse Bachu Biswas towards house of Arik Biswas1 |
Roof laid |
-
latitude : 23.1318734,23.1318734
Longitude : 88.5434031,88.5434031
file name : Image_28012022162725215.png
|
2022-01-28 16:27:25.424454 |
534 |
39066753 |
Improvement of concreat road fromhouse Bachu Biswas towards house of Arik Biswas |
125413 |
Improvement of concreat road fromhouse Bachu Biswas towards house of Arik Biswas1 |
Plinth level |
-
latitude : 23.1319728,23.1319728
Longitude : 88.5439877,88.5439877
file name : Image_15012022102239899.png
|
2022-01-15 10:22:40.007192 |
535 |
39066753 |
Improvement of concreat road fromhouse Bachu Biswas towards house of Arik Biswas |
125413 |
Improvement of concreat road fromhouse Bachu Biswas towards house of Arik Biswas1 |
Completion of work |
-
latitude : 23.1298191,23.1298191
Longitude : 88.5429019,88.5429019
file name : Image_10012022142347406.png
|
2022-01-10 14:23:47.530456 |
536 |
39072807 |
Construction of Drain from Sanjib Sarkar towards house of Tarasankar Sarkar |
300000 |
Construction of Drain from Sanjib Sarkar towards house of Tarasankar Sarkar1 |
Roof laid |
-
latitude : 23.126544,23.1265384
Longitude : 88.5420335,88.5419417
file name : Image_16032022161954503.png
|
2022-03-16 16:19:54.61698 |
537 |
39072807 |
Construction of Drain from Sanjib Sarkar towards house of Tarasankar Sarkar |
300000 |
Construction of Drain from Sanjib Sarkar towards house of Tarasankar Sarkar1 |
Plinth level |
-
latitude : 23.1265421,23.1265421
Longitude : 88.5419298,88.5419298
file name : Image_14032022094442004.png
|
2022-03-14 09:44:42.163972 |
538 |
39072807 |
Construction of Drain from Sanjib Sarkar towards house of Tarasankar Sarkar |
300000 |
Construction of Drain from Sanjib Sarkar towards house of Tarasankar Sarkar1 |
Completion of work |
-
latitude : 23.1265326,23.1265326
Longitude : 88.541958,88.541958
file name : Image_09022022141442852.png
|
2022-02-09 14:14:42.956946 |
539 |
39065612 |
Improvement of Concreat road fromTarun Das towards Rita Das |
125000 |
Improvement of Concreat road fromTarun Das towards Rita Das1 |
Roof laid |
-
latitude : 23.1249416,23.1249203
Longitude : 88.5468531,88.5467857
file name : Image_18062021110330572.png
|
2021-06-18 11:03:31.160266 |
540 |
39065612 |
Improvement of Concreat road fromTarun Das towards Rita Das |
125000 |
Improvement of Concreat road fromTarun Das towards Rita Das1 |
Plinth level |
-
latitude : 23.1247537,23.125108
Longitude : 88.5466517,88.5467245
file name : Image_18062021110100292.png
|
2021-06-18 11:01:00.878796 |
541 |
39065612 |
Improvement of Concreat road fromTarun Das towards Rita Das |
125000 |
Improvement of Concreat road fromTarun Das towards Rita Das1 |
Completion of work |
-
latitude : 23.124843,23.124939
Longitude : 88.5468171,88.5467065
file name : Image_18062021105831185.png
|
2021-06-18 10:58:31.78411 |
542 |
39066431 |
Improvement of Concreat road fromland of Shib Nath Das towards house of Gobinda roy and Setu babu |
305276 |
Improvement of Concreat road fromland of Shib Nath Das towards house of Gobinda roy and Setu babu1 |
Roof laid |
-
latitude : 23.1348941,23.1347551
Longitude : 88.5443705,88.5445233
file name : Image_17062021144310350.png
|
2021-06-17 14:43:10.707621 |
543 |
39066431 |
Improvement of Concreat road fromland of Shib Nath Das towards house of Gobinda roy and Setu babu |
305276 |
Improvement of Concreat road fromland of Shib Nath Das towards house of Gobinda roy and Setu babu1 |
Plinth level |
-
latitude : 23.1347369,23.134835,23.1348939
Longitude : 88.5445424,88.5444435,88.5443682
file name : Image_17062021144026866.png
|
2021-06-17 14:40:27.227443 |
544 |
39066431 |
Improvement of Concreat road fromland of Shib Nath Das towards house of Gobinda roy and Setu babu |
305276 |
Improvement of Concreat road fromland of Shib Nath Das towards house of Gobinda roy and Setu babu1 |
Completion of work |
-
latitude : 23.1348225,23.1346926
Longitude : 88.5444557,88.5445801
file name : Image_17062021143632287.png
|
2021-06-17 14:36:32.644463 |
545 |
39066968 |
Improvement of concreat road from house Haripada Sen towards house of Kalpana Mondal |
175000 |
Improvement of concreat road from house Haripada Sen towards house of Kalpana Mondal1 |
Roof laid |
-
latitude : 23.131653307937086,23.131685871630907
Longitude : 88.54015284217894,88.54019190184772
file name : Image_17062021152538631.png
|
2021-06-17 15:25:38.981664 |
546 |
39066968 |
Improvement of concreat road from house Haripada Sen towards house of Kalpana Mondal |
175000 |
Improvement of concreat road from house Haripada Sen towards house of Kalpana Mondal1 |
Plinth level |
-
latitude : 23.13169169705361,23.131640441715717
Longitude : 88.54016717523336,88.54010850191116
file name : Image_17062021152329542.png
|
2021-06-17 15:23:29.903962 |
547 |
39066968 |
Improvement of concreat road from house Haripada Sen towards house of Kalpana Mondal |
175000 |
Improvement of concreat road from house Haripada Sen towards house of Kalpana Mondal1 |
Completion of work |
-
latitude : 23.131669275462627,23.131650458090007
Longitude : 88.5399394389242,88.53991982527077
file name : Image_17062021152129136.png
|
2021-06-17 15:21:29.491488 |
548 |
39055664 |
Construction of Blacktop road fromKrishna Mondal towards Nimai Mondal and Chittya Mondal |
277479 |
Construction of Blacktop road fromKrishna Mondal towards Nimai Mondal and Chittya Mondal1 |
Roof laid |
-
latitude : 23.12625783495605,23.12625783495605
Longitude : 88.51557274349034,88.51557274349034
file name : Image_21092021141943316.png
|
2021-09-21 14:19:43.427574 |
549 |
39055664 |
Construction of Blacktop road fromKrishna Mondal towards Nimai Mondal and Chittya Mondal |
277479 |
Construction of Blacktop road fromKrishna Mondal towards Nimai Mondal and Chittya Mondal1 |
Plinth level |
-
latitude : 23.12625682912767,23.12625682912767
Longitude : 88.51560191251338,88.51560191251338
file name : Image_21092021141759400.png
|
2021-09-21 14:17:59.512922 |
550 |
39055664 |
Construction of Blacktop road fromKrishna Mondal towards Nimai Mondal and Chittya Mondal |
277479 |
Construction of Blacktop road fromKrishna Mondal towards Nimai Mondal and Chittya Mondal1 |
Completion of work |
-
latitude : 23.126245932653546,23.126245932653546
Longitude : 88.51562546566129,88.51562546566129
file name : Image_21092021141530522.png
|
2021-09-21 14:15:30.628375 |
551 |
58118937 |
PURCHASE TWO DRINKING WATER SUPPLY TANK |
350000 |
PURCHASE TWO DRINKING WATER SUPPLY TANK1 |
Roof laid |
-
latitude : 23.1316643
Longitude : 88.5432942
file name : Image_12052023141349701.png
|
2023-05-12 14:13:49.785493 |
552 |
58118937 |
PURCHASE TWO DRINKING WATER SUPPLY TANK |
350000 |
PURCHASE TWO DRINKING WATER SUPPLY TANK1 |
Plinth level |
-
latitude : 23.1316619
Longitude : 88.5433062
file name : Image_12052023135444969.png
|
2023-05-12 13:54:45.046281 |
553 |
58118937 |
PURCHASE TWO DRINKING WATER SUPPLY TANK |
350000 |
PURCHASE TWO DRINKING WATER SUPPLY TANK1 |
Plinth level |
-
latitude : 23.1316596
Longitude : 88.5432983
file name : Image_12052023135205482.png
|
2023-05-12 13:52:05.552554 |
554 |
58118937 |
PURCHASE TWO DRINKING WATER SUPPLY TANK |
350000 |
PURCHASE TWO DRINKING WATER SUPPLY TANK1 |
Completion of work |
-
latitude : 23.1316595
Longitude : 88.5433021
file name : Image_12052023134842754.png
|
2023-05-12 13:48:42.836245 |
555 |
39063130 |
Improvement of Concreat road from Sunirmal Chowdhary towards Parimal Sarkar |
247962 |
Improvement of Concreat road from Sunirmal Chowdhary towards Parimal Sarkar 1 |
Roof laid |
-
latitude : 23.119335095398128,23.1188814,23.1188814
Longitude : 88.54590618051589,88.5458069,88.5458069
file name : Image_18062021104956907.png
|
2021-06-18 10:49:57.501662 |
556 |
39063130 |
Improvement of Concreat road from Sunirmal Chowdhary towards Parimal Sarkar |
247962 |
Improvement of Concreat road from Sunirmal Chowdhary towards Parimal Sarkar 1 |
Plinth level |
-
latitude : 23.1190304,23.1192972
Longitude : 88.5455418,88.5450991
file name : Image_18062021104740139.png
|
2021-06-18 10:47:40.736188 |
557 |
39063130 |
Improvement of Concreat road from Sunirmal Chowdhary towards Parimal Sarkar |
247962 |
Improvement of Concreat road from Sunirmal Chowdhary towards Parimal Sarkar 1 |
Completion of work |
-
latitude : 23.11930349562317,23.119318666867912
Longitude : 88.54587935842574,88.54589075781405
file name : Image_18062021104322344.png
|
2021-06-18 10:43:22.945222 |
558 |
89922973 |
Drainage Construction |
350000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.1221612
Longitude : 88.5238294
file name : Image_23092024120810903.png
|
2024-09-23 12:08:10.971929 |
559 |
89922973 |
Drainage Construction |
350000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.12172603327781
Longitude : 88.52379723452032
file name : Image_09092024122855511.png
|
2024-09-09 12:30:38.249358 |
560 |
89922973 |
Drainage Construction |
350000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.1221795
Longitude : 88.5238032
file name : Image_17082024142841046.png
|
2024-08-17 14:28:41.099511 |
561 |
89923411 |
Drainage Construction |
350000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.1223099
Longitude : 88.5444037
file name : Image_17082024134245314.png
|
2024-08-17 13:42:45.382331 |
562 |
89923833 |
Drainage Construction |
350000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.1280066
Longitude : 88.5472676
file name : Image_23092024122027854.png
|
2024-09-23 12:20:27.907897 |
563 |
89923833 |
Drainage Construction |
350000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.1281757
Longitude : 88.5473141
file name : Image_04092024114219174.png
|
2024-09-04 11:42:19.246079 |
564 |
89923833 |
Drainage Construction |
350000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.1282498
Longitude : 88.5472604
file name : Image_17082024135420747.png
|
2024-08-17 13:54:20.807038 |
565 |
89922520 |
Drinking water facilities/ Installation of RO/ Water Filter |
700000 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
|
-
latitude : 23.1362804
Longitude : 88.5469951
file name : Image_20082024134321624.png
|
2024-08-20 13:43:21.831441 |
566 |
89974448 |
Construction of toilets in public institutions |
245000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.1239625
Longitude : 88.5489939
file name : Image_22092024112900423.png
|
2024-09-22 11:29:00.48835 |
567 |
89974448 |
Construction of toilets in public institutions |
245000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.1238431
Longitude : 88.5490423
file name : Image_17082024132235831.png
|
2024-08-17 13:22:35.896896 |
568 |
89974654 |
Construction of toilets in public institutions |
245000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.1225382
Longitude : 88.5466467
file name : Image_22092024112027196.png
|
2024-09-22 11:20:27.255677 |
569 |
89974654 |
Construction of toilets in public institutions |
245000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.1224993
Longitude : 88.5460459
file name : Image_17082024140824821.png
|
2024-08-17 14:08:24.881608 |
570 |
89974914 |
Construction of toilets in public institutions |
245000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.117924882099032
Longitude : 88.5346463508904
file name : Image_04092024124040873.png
|
2024-09-04 12:40:47.897601 |
571 |
89975274 |
Construction of toilets in public institutions |
245000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.1227219
Longitude : 88.541883
file name : Image_22092024103306715.png
|
2024-09-22 10:33:06.788013 |
572 |
89975274 |
Construction of toilets in public institutions |
245000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.1222962
Longitude : 88.5417166
file name : Image_23082024144205058.png
|
2024-08-23 14:42:05.159051 |
573 |
89975095 |
Construction of toilets in public institutions |
245000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.1270954
Longitude : 88.5419988
file name : Image_22092024114827555.png
|
2024-09-22 11:48:27.615282 |
574 |
89975095 |
Construction of toilets in public institutions |
245000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.127188
Longitude : 88.5416956
file name : Image_17082024141655011.png
|
2024-08-17 14:16:55.067153 |
575 |
106777518 |
Creation of a new source of drinking water |
700000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.1220179
Longitude : 88.5486129
file name : Image_17082024131339509.png
|
2024-08-17 13:13:39.56697 |
576 |
106777603 |
Creation of a new source of drinking water |
700000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.128696591593325
Longitude : 88.52237608283758
file name : Image_17082024143610111.png
|
2024-08-17 14:36:10.17549 |
577 |
70736763 |
Construction of Community Sanitary Complex |
220000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.1316194
Longitude : 88.543328
file name : Image_28112024130940673.png
|
2024-11-28 13:09:40.728763 |
578 |
70736763 |
Construction of Community Sanitary Complex |
220000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.1316225
Longitude : 88.5433322
file name : Image_28112024130454370.png
|
2024-11-28 13:04:54.427148 |
579 |
70736763 |
Construction of Community Sanitary Complex |
220000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.13029418233782
Longitude : 88.51103059016168
file name : Image_29082024130151882.png
|
2024-08-29 13:01:51.947319 |
580 |
70887892 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.1255438
Longitude : 88.5432057
file name : Image_23082024143830574.png
|
2024-08-23 14:38:30.666253 |
581 |
70738717 |
Construction of Community Sanitary Complex |
210000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.131621
Longitude : 88.5433316
file name : Image_28112024131220294.png
|
2024-11-28 13:12:20.352592 |
582 |
70738717 |
Construction of Community Sanitary Complex |
210000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.1185395
Longitude : 88.5455822
file name : Image_22092024112430866.png
|
2024-09-22 11:24:30.923442 |
583 |
70738717 |
Construction of Community Sanitary Complex |
210000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.1176344
Longitude : 88.5453961
file name : Image_29082024144813108.png
|
2024-08-29 14:48:13.828019 |
584 |
106777087 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.1288893
Longitude : 88.5469926
file name : Image_19082024134945245.png
|
2024-08-19 13:49:45.296415 |
585 |
106776956 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.1270417
Longitude : 88.5432973
file name : Image_19082024132425750.png
|
2024-08-19 13:24:25.799334 |
586 |
106776885 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
|
-
latitude : 23.12976796645671
Longitude : 88.53043226525187
file name : Image_19082024133528237.png
|
2024-08-19 13:35:28.299465 |
587 |
48245661 |
COMMUNITY TOILET AT NIYAMATPUR GP LAND |
447844 |
COMMUNITY TOILET AT NIYAMATPUR GP LAND1 |
Roof laid |
-
latitude : 23.12674629036337
Longitude : 88.52751418948174
file name : Image_30082022140125970.png
|
2022-08-30 14:01:26.054064 |
588 |
48245661 |
COMMUNITY TOILET AT NIYAMATPUR GP LAND |
447844 |
COMMUNITY TOILET AT NIYAMATPUR GP LAND1 |
Plinth level |
-
latitude : 23.12666586600244
Longitude : 88.52711571380496
file name : Image_08062022134409752.png
|
2022-06-08 13:44:09.843474 |
589 |
48245661 |
COMMUNITY TOILET AT NIYAMATPUR GP LAND |
447844 |
COMMUNITY TOILET AT NIYAMATPUR GP LAND1 |
Completion of work |
-
latitude : 23.126908312551677
Longitude : 88.52747680619359
file name : Image_01042022122500959.png
|
2022-04-01 12:25:01.085813 |
590 |
48179957 |
MAINTAINANCE AND PURCHASE OF STREET LIGHT ALL SANSAD OF PAYRADANGA GP |
300000 |
MAINTAINANCE AND PURCHASE OF STREET LIGHT ALL SANSAD OF PAYRADANGA GP1 |
Roof laid |
-
latitude : 23.1316185
Longitude : 88.5433081
file name : Image_03032022154313095.png
|
2022-03-03 15:43:13.27897 |
591 |
48179957 |
MAINTAINANCE AND PURCHASE OF STREET LIGHT ALL SANSAD OF PAYRADANGA GP |
300000 |
MAINTAINANCE AND PURCHASE OF STREET LIGHT ALL SANSAD OF PAYRADANGA GP1 |
Plinth level |
-
latitude : 23.131636
Longitude : 88.5433029
file name : Image_03032022154112383.png
|
2022-03-03 15:41:12.56695 |
592 |
48179957 |
MAINTAINANCE AND PURCHASE OF STREET LIGHT ALL SANSAD OF PAYRADANGA GP |
300000 |
MAINTAINANCE AND PURCHASE OF STREET LIGHT ALL SANSAD OF PAYRADANGA GP1 |
Completion of work |
-
latitude : 23.1316084
Longitude : 88.5432938
file name : Image_03032022153906178.png
|
2022-03-03 15:39:06.38741 |
593 |
67821675 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
350000 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
|
-
latitude : 23.144314507953823
Longitude : 88.55085720308125
file name : Image_08042024152300012.png
|
2024-04-08 15:23:00.095664 |
594 |
89918680 |
Construction of roads |
129045 |
Construction of roads1 |
Roof laid |
-
latitude : 23.137332843616605,23.137332843616605
Longitude : 88.54238393716514,88.54238393716514
file name : Image_20112024151725782.png
|
2024-11-20 15:17:25.839927 |
595 |
89918680 |
Construction of roads |
129045 |
Construction of roads1 |
Plinth level |
-
latitude : 23.137350361794233,23.137350361794233
Longitude : 88.54235384613276,88.54235384613276
file name : Image_20112024151444021.png
|
2024-11-20 15:14:44.088604 |
596 |
89918680 |
Construction of roads |
129045 |
Construction of roads1 |
Completion of work |
-
latitude : 23.13734474591911,23.13734474591911
Longitude : 88.54234823025763,88.54234823025763
file name : Image_20112024150114854.png
|
2024-11-20 15:01:14.908594 |
597 |
89897621 |
Construction of roads |
175000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.1349465,23.1349465
Longitude : 88.529209,88.529209
file name : Image_04112024155506242.png
|
2024-11-04 15:55:06.309449 |
598 |
89897621 |
Construction of roads |
175000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.1348447,23.1348447
Longitude : 88.5291408,88.5291408
file name : Image_04112024155306667.png
|
2024-11-04 15:53:06.725389 |
599 |
89897621 |
Construction of roads |
175000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.1349725,23.1349725
Longitude : 88.5292226,88.5292226
file name : Image_04112024154424021.png
|
2024-11-04 15:44:24.081462 |
600 |
89898437 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.1316382,23.1316382
Longitude : 88.543325,88.543325
file name : Image_06112024145251486.png
|
2024-11-06 14:52:51.537226 |
601 |
89898437 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.12922435812652,23.129224441945553
Longitude : 88.52945258840919,88.52945275604725
file name : Image_04112024160930155.png
|
2024-11-04 16:09:30.209609 |
602 |
89898437 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.12925369478762,23.12925369478762
Longitude : 88.529457366094,88.529457366094
file name : Image_04112024160706544.png
|
2024-11-04 16:07:06.597213 |
603 |
89898437 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.12923244666308,23.12923244666308
Longitude : 88.52944588288665,88.52944588288665
file name : Image_04112024160427278.png
|
2024-11-04 16:04:27.325756 |
604 |
89900069 |
Construction of roads |
70408 |
BT TOWARDS AKHIL BISWAS |
Roof laid |
-
latitude : 23.12642283271998,23.12642283271998
Longitude : 88.53553483262658,88.53553483262658
file name : Image_04112024162741718.png
|
2024-11-04 16:27:41.910889 |
605 |
89900069 |
Construction of roads |
70408 |
BT TOWARDS AKHIL BISWAS |
Plinth level |
-
latitude : 23.126435740850866,23.126435740850866
Longitude : 88.53553734719753,88.53553734719753
file name : Image_04112024162557138.png
|
2024-11-04 16:25:57.190078 |
606 |
89900069 |
Construction of roads |
70408 |
BT TOWARDS AKHIL BISWAS |
Completion of work |
-
latitude : 23.126433813013136,23.126433813013136
Longitude : 88.53551865555346,88.53551865555346
file name : Image_04112024162400138.png
|
2024-11-04 16:24:00.185552 |
607 |
89908278 |
Construction of roads |
230800 |
BHAJA SAHA TOWARDS MANOJIT BISWAS |
Roof laid |
-
latitude : 23.126928,23.1269215
Longitude : 88.5497361,88.5497422
file name : Image_20112024142527466.png
|
2024-11-20 14:25:27.516619 |
608 |
89908278 |
Construction of roads |
230800 |
BHAJA SAHA TOWARDS MANOJIT BISWAS |
Plinth level |
-
latitude : 23.1269381,23.1269381
Longitude : 88.5497524,88.5497524
file name : Image_20112024142348250.png
|
2024-11-20 14:23:48.317419 |
609 |
89908278 |
Construction of roads |
230800 |
BHAJA SAHA TOWARDS MANOJIT BISWAS |
Completion of work |
-
latitude : 23.1269138,23.1269138
Longitude : 88.5497358,88.5497358
file name : Image_20112024142006015.png
|
2024-11-20 14:20:06.07282 |
610 |
89919345 |
Construction of roads |
100000 |
SUJIT DAS TOWARDS HARITOSH BISWAS |
Roof laid |
-
latitude : 23.138199532404542,23.138199532404542
Longitude : 88.53886974044144,88.53886974044144
file name : Image_04112024171317805.png
|
2024-11-04 17:13:17.853085 |
611 |
89919345 |
Construction of roads |
100000 |
SUJIT DAS TOWARDS HARITOSH BISWAS |
Plinth level |
-
latitude : 23.138183942064643,23.138183942064643
Longitude : 88.53886915370822,88.53886915370822
file name : Image_04112024171136135.png
|
2024-11-04 17:11:36.192419 |
612 |
89919345 |
Construction of roads |
100000 |
SUJIT DAS TOWARDS HARITOSH BISWAS |
Completion of work |
-
latitude : 23.13819752074778,23.13819752074778
Longitude : 88.53885943070054,88.53885943070054
file name : Image_04112024170953660.png
|
2024-11-04 17:09:53.708761 |
613 |
89920093 |
Construction of roads |
221086 |
GOBINDA TOWARDS SHANKAR |
Roof laid |
-
latitude : 23.131986,23.1313267
Longitude : 88.5403133,88.5410417
file name : Image_04112024165830993.png
|
2024-11-04 16:58:31.095821 |
614 |
89920093 |
Construction of roads |
221086 |
GOBINDA TOWARDS SHANKAR |
Plinth level |
-
latitude : 23.1319682,23.1319682
Longitude : 88.5403801,88.5403801
file name : Image_04112024165701276.png
|
2024-11-04 16:57:01.32907 |
615 |
89920093 |
Construction of roads |
221086 |
GOBINDA TOWARDS SHANKAR |
Completion of work |
-
latitude : 23.131747227162123,23.131747227162123
Longitude : 88.54064075276256,88.54064075276256
file name : Image_04112024165511661.png
|
2024-11-04 16:55:11.714366 |
616 |
89899783 |
Construction of roads |
125000 |
ILA TOWARDS NARAYAN |
Roof laid |
-
latitude : 23.1230488,23.1230488
Longitude : 88.5350508,88.5350508
file name : Image_04112024164142426.png
|
2024-11-04 16:41:42.469857 |
617 |
89899783 |
Construction of roads |
125000 |
ILA TOWARDS NARAYAN |
Plinth level |
-
latitude : 23.1230138,23.1230138
Longitude : 88.5350366,88.5350366
file name : Image_04112024164000258.png
|
2024-11-04 16:40:00.317157 |
618 |
89899783 |
Construction of roads |
125000 |
ILA TOWARDS NARAYAN |
Completion of work |
-
latitude : 23.1230459,23.1230459
Longitude : 88.5350465,88.5350465
file name : Image_04112024163717475.png
|
2024-11-04 16:37:17.52795 |
619 |
89922195 |
Drinking water facilities/ Installation of RO/ Water Filter |
350000 |
SAJALDHARA NUTAN SHIBPUR |
|
-
latitude : 23.12635514885187
Longitude : 88.51550082676113
file name : Image_07112024165156766.png
|
2024-11-07 16:51:56.817008 |
620 |
106777561 |
Creation of a new source of drinking water |
350000 |
ELACH BISWAS MINI SAJALDHARA |
|
-
latitude : 23.1231012
Longitude : 88.5350321
file name : Image_07112024163947224.png
|
2024-11-07 16:39:47.272442 |
621 |
89919494 |
Construction of roads |
100000 |
ASIT DAS TOWARDS BALAI DAS |
Roof laid |
-
latitude : 23.137437952682376,23.13745257910341
Longitude : 88.53955965489149,88.53953962214291
file name : Image_22112024124250349.png
|
2024-11-22 12:42:50.409556 |
622 |
89919494 |
Construction of roads |
100000 |
ASIT DAS TOWARDS BALAI DAS |
Plinth level |
-
latitude : 23.137421985156834,23.137421985156834
Longitude : 88.53963408619165,88.53963408619165
file name : Image_21112024133146877.png
|
2024-11-21 13:31:46.952247 |
623 |
89919494 |
Construction of roads |
100000 |
ASIT DAS TOWARDS BALAI DAS |
Completion of work |
-
latitude : 23.1374747492373,23.1374747492373
Longitude : 88.53960919193923,88.53960919193923
file name : Image_20112024152247862.png
|
2024-11-20 15:22:47.926987 |
624 |
89907671 |
Construction of roads |
175000 |
BT PARTHA DAS TOWARDS GOURANGA NAG |
Roof laid |
-
latitude : 23.1309904,23.1309904
Longitude : 88.5509571,88.5509571
file name : Image_20112024143435779.png
|
2024-11-20 14:34:35.831437 |
625 |
89907671 |
Construction of roads |
175000 |
BT PARTHA DAS TOWARDS GOURANGA NAG |
Plinth level |
-
latitude : 23.1310137,23.1310137
Longitude : 88.5509523,88.5509523
file name : Image_20112024143309904.png
|
2024-11-20 14:33:09.986965 |
626 |
89907671 |
Construction of roads |
175000 |
BT PARTHA DAS TOWARDS GOURANGA NAG |
Completion of work |
-
latitude : 23.1309859,23.1309859
Longitude : 88.5509597,88.5509597
file name : Image_20112024143101314.png
|
2024-11-20 14:31:01.374578 |
627 |
89903735 |
Construction of roads |
200000 |
PCC FROM TAPAN GAIN TOWARDS NILRATAN SARKAR |
Roof laid |
-
latitude : 23.11614808626473,23.11614808626473
Longitude : 88.53792132809758,88.53792132809758
file name : Image_20112024140757316.png
|
2024-11-20 14:07:57.38697 |
628 |
89903735 |
Construction of roads |
200000 |
PCC FROM TAPAN GAIN TOWARDS NILRATAN SARKAR |
Plinth level |
-
latitude : 23.11622549314052,23.11622549314052
Longitude : 88.53790431283414,88.53790431283414
file name : Image_20112024140635631.png
|
2024-11-20 14:06:35.704415 |
629 |
89903735 |
Construction of roads |
200000 |
PCC FROM TAPAN GAIN TOWARDS NILRATAN SARKAR |
Completion of work |
-
latitude : 23.116197623312473,23.116197623312473,23.116197623312473
Longitude : 88.53797798976302,88.53797798976302,88.53797798976302
file name : Image_20112024140316436.png
|
2024-11-20 14:03:16.496531 |
630 |
70885786 |
Construction of toilets in public institutions |
184140 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.1316238
Longitude : 88.543324
file name : Image_28112024141827717.png
|
2024-11-28 14:18:27.777315 |
631 |
70885786 |
Construction of toilets in public institutions |
184140 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.1316204
Longitude : 88.5433302
file name : Image_28112024141528239.png
|
2024-11-28 14:15:28.291283 |
632 |
70885786 |
Construction of toilets in public institutions |
184140 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.1316185
Longitude : 88.5433309
file name : Image_28112024141348275.png
|
2024-11-28 14:13:48.334023 |
633 |
89896249 |
Construction of roads |
150000 |
PAKA RASTA TOWARDS ANIL DURLAV |
Roof laid |
-
latitude : 23.120929207652807,23.120929207652807
Longitude : 88.52602439001203,88.52602439001203
file name : Image_03122024142830913.png
|
2024-12-03 14:28:30.964684 |
634 |
89896249 |
Construction of roads |
150000 |
PAKA RASTA TOWARDS ANIL DURLAV |
Plinth level |
-
latitude : 23.120977277867496,23.120977277867496
Longitude : 88.52593746967614,88.52593746967614
file name : Image_03122024142648803.png
|
2024-12-03 14:26:48.861632 |
635 |
89896249 |
Construction of roads |
150000 |
PAKA RASTA TOWARDS ANIL DURLAV |
Completion of work |
-
latitude : 23.121013697236776,23.121013697236776
Longitude : 88.52590545080602,88.52590545080602
file name : Image_03122024142145108.png
|
2024-12-03 14:21:45.164475 |