1 |
38831141 |
Construction of PCC road from Janaki Bala to Pucca rasta at Ilsamari |
334964 |
Construction of PCC road from Janaki Bala to Pucca rasta at Ilsamari 1 |
Roof laid |
-
latitude : 23.8556667,23.8589408
Longitude : 88.5489178,88.5586877
file name : Image_13122023144006450.png
|
2023-12-13 14:40:06.539313 |
2 |
38831141 |
Construction of PCC road from Janaki Bala to Pucca rasta at Ilsamari |
334964 |
Construction of PCC road from Janaki Bala to Pucca rasta at Ilsamari 1 |
Plinth level |
-
latitude : 23.7356879,23.7356877
Longitude : 88.5232188,88.5232187
file name : Image_09122023160810685.png
|
2023-12-09 16:08:10.810236 |
3 |
38831141 |
Construction of PCC road from Janaki Bala to Pucca rasta at Ilsamari |
334964 |
Construction of PCC road from Janaki Bala to Pucca rasta at Ilsamari 1 |
Completion of work |
-
latitude : 23.858901550993323,23.8589960988611
Longitude : 88.55890416540205,88.55888748541474
file name : Image_22082021181332851.png
|
2021-08-22 18:13:32.930262 |
4 |
35135129 |
PCC road from Kamal Biswas to Sushil Biswas |
275563 |
PCC road from Kamal Biswas to Sushil Biswas1 |
Plinth level |
-
latitude : 23.7356216,23.7356215
Longitude : 88.5232243,88.5232242
file name : Image_13012024132320203.png
|
2024-01-13 13:23:20.300137 |
5 |
35135129 |
PCC road from Kamal Biswas to Sushil Biswas |
275563 |
PCC road from Kamal Biswas to Sushil Biswas1 |
Completion of work |
-
latitude : 23.85634733363986,23.85641237720847,23.85641237720847
Longitude : 88.54726103134453,88.54723605327308,88.54723605327308
file name : Image_18082021115747392.png
|
2021-08-18 11:57:47.504839 |
6 |
39071200 |
Construction of Drain of DTW near Chember no two at mobarakpur |
347563 |
Construction of Drain of DTW near Chember no two at mobarakpur1 |
Plinth level |
-
latitude : 23.7356214,23.7356214,23.7356214
Longitude : 88.5232248,88.5232248,88.5232248
file name : Image_13012024173011651.png
|
2024-01-13 17:30:11.749652 |
7 |
39071200 |
Construction of Drain of DTW near Chember no two at mobarakpur |
347563 |
Construction of Drain of DTW near Chember no two at mobarakpur1 |
Completion of work |
-
latitude : 23.8382089,23.8382089
Longitude : 88.5597023,88.5597023
file name : Image_24082021135325318.png
|
2021-08-24 13:53:25.400542 |
8 |
39071200 |
Construction of Drain of DTW near Chember no two at mobarakpur |
347563 |
Construction of Drain of DTW near Chember no two at mobarakpur1 |
Completion of work |
-
latitude : 23.83653041906655,23.836597641929984
Longitude : 88.56108639389277,88.56108698062599
file name : Image_24082021135554320.png
|
2021-08-24 13:55:54.400635 |
9 |
76492327 |
Inst. Solar Light at 2 nos Bridge at Ilshamari and Monarakpur |
65995 |
Inst. Solar Light at 2 nos Bridge at Ilshamari and Monarakpur1 |
Roof laid |
-
latitude : 23.842851666666668
Longitude : 88.56824499999999
file name : Image_02042024151028893.png
|
2024-04-02 15:10:29.011275 |
10 |
76492327 |
Inst. Solar Light at 2 nos Bridge at Ilshamari and Monarakpur |
65995 |
Inst. Solar Light at 2 nos Bridge at Ilshamari and Monarakpur1 |
Plinth level |
-
latitude : 23.842873333333333
Longitude : 88.56817833333335
file name : Image_02042024150720846.png
|
2024-04-02 15:07:20.971738 |
11 |
76492327 |
Inst. Solar Light at 2 nos Bridge at Ilshamari and Monarakpur |
65995 |
Inst. Solar Light at 2 nos Bridge at Ilshamari and Monarakpur1 |
Completion of work |
-
latitude : 23.84285
Longitude : 88.56817333333332
file name : Image_02042024150122924.png
|
2024-04-02 15:01:23.030327 |
12 |
76492327 |
Inst. Solar Light at 2 nos Bridge at Ilshamari and Monarakpur |
65995 |
Inst. Solar Light at 2 nos Bridge at Ilshamari and Monarakpur1 |
Completion of work |
-
latitude : 23.8455375
Longitude : 88.5701916
file name : Image_21032024133217680.png
|
2024-03-21 13:32:17.853201 |
13 |
76492327 |
Inst. Solar Light at 2 nos Bridge at Ilshamari and Monarakpur |
65995 |
Inst. Solar Light at 2 nos Bridge at Ilshamari and Monarakpur1 |
Completion of work |
-
latitude : 23.8412344
Longitude : 88.5683987
file name : Image_12032024135751091.png
|
2024-03-12 13:57:51.180865 |
14 |
69559097 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.831015
Longitude : 88.53994333333334
file name : Image_29082024164605754.png
|
2024-08-29 16:46:06.406416 |
15 |
69559097 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.83107
Longitude : 88.53984
file name : Image_25072024141804438.png
|
2024-07-25 14:18:04.497875 |
16 |
69559097 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.8518017
Longitude : 88.5455569
file name : Image_04042024164337322.png
|
2024-04-04 16:43:37.423651 |
17 |
68714017 |
Drinking water facility |
850000 |
Drinking water facility1 |
Roof laid |
-
latitude : 23.84639666666667
Longitude : 88.57357500000002
file name : Image_09072024122623815.png
|
2024-07-09 12:26:23.923048 |
18 |
68714017 |
Drinking water facility |
850000 |
Drinking water facility1 |
Roof laid |
-
latitude : 23.846400000000003
Longitude : 88.57365666666668
file name : Image_09072024122628636.png
|
2024-07-09 12:26:28.743557 |
19 |
68714017 |
Drinking water facility |
850000 |
Drinking water facility1 |
Roof laid |
-
latitude : 23.8536332
Longitude : 88.5451414
file name : Image_16042024132958737.png
|
2024-04-16 13:29:58.850936 |
20 |
68714017 |
Drinking water facility |
850000 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.846378333333337
Longitude : 88.57350666666667
file name : Image_09042024141406824.png
|
2024-04-09 14:14:06.953358 |
21 |
68714017 |
Drinking water facility |
850000 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.84638166666667
Longitude : 88.57355000000001
file name : Image_09042024140943590.png
|
2024-04-09 14:09:43.705026 |
22 |
69565960 |
Drainage Construction |
300000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.857990000000004
Longitude : 88.55621666666666
file name : Image_09042024152206106.png
|
2024-04-09 15:22:06.192898 |
23 |
69565960 |
Drainage Construction |
300000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.85799833333333
Longitude : 88.55617666666667
file name : Image_09042024150146770.png
|
2024-04-09 15:01:46.859008 |
24 |
69565960 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.85804333333333
Longitude : 88.55693166666667
file name : Image_08042024125507621.png
|
2024-04-08 12:55:07.724263 |
25 |
60490525 |
installation of drinking water purification plant operated by solar energy near astullanagar junior |
1050000 |
installation of drinking water purification plant operated by solar energy near astullanagar junior 1 |
Completion of work |
-
latitude : 23.858428853563964
Longitude : 88.55719576589763
file name : Image_16032022165040545.png
|
2022-03-16 16:50:40.663302 |
26 |
60489842 |
construction of 134 DTW at nazirpur under chhitka gp |
347563 |
construction of 134 DTW at nazirpur under chhitka gp1 |
Completion of work |
-
latitude : 23.8517785
Longitude : 88.5455581
file name : Image_09082024152808600.png
|
2024-08-09 15:28:09.027645 |
27 |
60489842 |
construction of 134 DTW at nazirpur under chhitka gp |
347563 |
construction of 134 DTW at nazirpur under chhitka gp1 |
Completion of work |
-
latitude : 23.8518459
Longitude : 88.5455795
file name : Image_19012024133251491.png
|
2024-01-19 13:32:51.659539 |
28 |
60489842 |
construction of 134 DTW at nazirpur under chhitka gp |
347563 |
construction of 134 DTW at nazirpur under chhitka gp1 |
Completion of work |
-
latitude : 23.7356216
Longitude : 88.5232245
file name : Image_13012024134449063.png
|
2024-01-13 13:44:49.15989 |
29 |
60489842 |
construction of 134 DTW at nazirpur under chhitka gp |
347563 |
construction of 134 DTW at nazirpur under chhitka gp1 |
Completion of work |
-
latitude : 23.876621145755053
Longitude : 88.53325101546943
file name : Image_16032022171443745.png
|
2022-03-16 17:14:43.823813 |
30 |
35133139 |
PCC road from Haripada Biswas to Bablu Biswas |
182930 |
PCC road from Haripada Biswas to Bablu Biswas 1 |
Plinth level |
-
latitude : 23.851828,23.851828
Longitude : 88.5455734,88.5455734
file name : Image_27012024144714700.png
|
2024-01-27 14:47:14.849147 |
31 |
35133139 |
PCC road from Haripada Biswas to Bablu Biswas |
182930 |
PCC road from Haripada Biswas to Bablu Biswas 1 |
Completion of work |
-
latitude : 23.85931691620499,23.859317880123854
Longitude : 88.55805843137205,88.55806086212397
file name : Image_24022022180431758.png
|
2022-02-24 18:04:31.819102 |
32 |
49424514 |
Concrete Road at Mrigi Fakirabadpara Pacca Rasta to House of Hisabuddin |
350000 |
Concrete Road at Mrigi Fakirabadpara Pacca Rasta to House of Hisabuddin1 |
Plinth level |
-
latitude : 23.7356264,23.7356214
Longitude : 88.5232247,88.5232243
file name : Image_13012024161407344.png
|
2024-01-13 16:14:07.482258 |
33 |
49424514 |
Concrete Road at Mrigi Fakirabadpara Pacca Rasta to House of Hisabuddin |
350000 |
Concrete Road at Mrigi Fakirabadpara Pacca Rasta to House of Hisabuddin1 |
Completion of work |
-
latitude : 23.86372,23.8637206
Longitude : 88.511403,88.5114036
file name : Image_23052022152508102.png
|
2022-05-23 15:25:08.168647 |
34 |
49418758 |
Improvement of Concrete Road at Ilshamari Pacca Rasta to House of Dikul Mondal |
350000 |
Improvement of Concrete Road at Ilshamari Pacca Rasta to House of Dikul Mondal1 |
Plinth level |
-
latitude : 23.7356219,23.7356219
Longitude : 88.5232241,88.5232241
file name : Image_13012024153851560.png
|
2024-01-13 15:38:51.715514 |
35 |
49418758 |
Improvement of Concrete Road at Ilshamari Pacca Rasta to House of Dikul Mondal |
350000 |
Improvement of Concrete Road at Ilshamari Pacca Rasta to House of Dikul Mondal1 |
Completion of work |
-
latitude : 23.7356218,23.7356218
Longitude : 88.523224,88.523224
file name : Image_13012024152403472.png
|
2024-01-13 15:24:03.652936 |
36 |
49418758 |
Improvement of Concrete Road at Ilshamari Pacca Rasta to House of Dikul Mondal |
350000 |
Improvement of Concrete Road at Ilshamari Pacca Rasta to House of Dikul Mondal1 |
Completion of work |
-
latitude : 23.7356215,23.7356213
Longitude : 88.5232238,88.5232244
file name : Image_13012024145224187.png
|
2024-01-13 14:52:24.281743 |
37 |
49418758 |
Improvement of Concrete Road at Ilshamari Pacca Rasta to House of Dikul Mondal |
350000 |
Improvement of Concrete Road at Ilshamari Pacca Rasta to House of Dikul Mondal1 |
Completion of work |
-
latitude : 23.84465763811022,23.84465763811022
Longitude : 88.5686312802136,88.5686312802136
file name : Image_12052022090941801.png
|
2022-05-12 09:09:41.871176 |
38 |
49419815 |
Improvement of Black Top Road at Mobarakpur House Trinath Mondal to Ranjit Mondal |
350000 |
Improvement of Black Top Road at Mobarakpur House Trinath Mondal to Ranjit Mondal1 |
Completion of work |
-
latitude : 23.8365792,23.8365906
Longitude : 88.5760212,88.5760539
file name : Image_01062022123628393.png
|
2022-06-01 12:36:28.458521 |
39 |
76499058 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.8563461
Longitude : 88.5191484
file name : Image_24012024152005450.png
|
2024-01-24 15:20:05.545564 |
40 |
76499058 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.8563461
Longitude : 88.5191484
file name : Image_24012024151424723.png
|
2024-01-24 15:14:24.825745 |
41 |
76499058 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.856736666666666
Longitude : 88.51349499999999
file name : Image_21012024142712682.png
|
2024-01-21 14:27:12.775807 |
42 |
76499058 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.857031666666664
Longitude : 88.51358499999999
file name : Image_19012024151722044.png
|
2024-01-19 15:17:22.132053 |
43 |
67308890 |
construction of PCC Road from the house of ashok majhi towards pucca rasta at chhitka |
120000 |
construction of PCC Road from the house of ashok majhi towards pucca rasta at chhitka1 |
Plinth level |
-
latitude : 23.200271666666662,23.849091666666663
Longitude : 88.53415000000001,88.54689166666667
file name : Image_19072023140807032.png
|
2023-07-19 14:08:07.148724 |
44 |
76493547 |
Cons. of PCC Road From Main Road to the house of Ananda Saha at Chhitka |
150000 |
Cons. of PCC Road From Main Road to the house of Ananda Saha at Chhitka1 |
Roof laid |
-
latitude : 23.8514433,23.208810000000003
Longitude : 88.5457363,88.572025
file name : Image_28062023131214967.png
|
2023-06-28 13:12:14.919677 |
45 |
76511343 |
Creation of a new source of drinking water |
255762 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.8606523
Longitude : 88.5385879
file name : Image_24012024145908398.png
|
2024-01-24 14:59:08.487476 |
46 |
76511343 |
Creation of a new source of drinking water |
255762 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.8606609
Longitude : 88.5385763
file name : Image_24012024145603329.png
|
2024-01-24 14:56:03.426328 |
47 |
76511343 |
Creation of a new source of drinking water |
255762 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.8606596
Longitude : 88.5385768
file name : Image_24012024145125790.png
|
2024-01-24 14:51:25.879179 |
48 |
76567541 |
Grey water management — collection infrastructure |
325000 |
Construction of Pucca Drain with Slab from L O Manindra Malakar Harimandir at Khanjipur |
Roof laid |
-
latitude : 23.868886
Longitude : 88.5714182
file name : Image_30062023154001372.png
|
2023-06-30 15:40:01.477274 |
49 |
64459609 |
PCC Road from Puca Rasta to Mobile Tower at Mirgi Boardpara |
350000 |
PCC Road from Puca Rasta to Mobile Tower at Mirgi Boardpara1 |
Completion of work |
-
latitude : 23.852984999999997,23.852860000000003
Longitude : 88.52505833333335,88.52505666666666
file name : Image_29122022143702642.png
|
2022-12-29 14:37:02.757995 |
50 |
89171606 |
Drainage Construction |
300000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.840304999999997
Longitude : 88.57985166666667
file name : Image_23092024130425696.png
|
2024-09-23 13:04:25.758178 |
51 |
89171606 |
Drainage Construction |
300000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.853456666666663
Longitude : 88.54503000000001
file name : Image_09092024152205294.png
|
2024-09-09 15:23:50.343567 |
52 |
89171606 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.84050333333333
Longitude : 88.58015166666668
file name : Image_04092024140345116.png
|
2024-09-04 14:03:53.252065 |
53 |
89171606 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.84044833333333
Longitude : 88.58017
file name : Image_04092024140204885.png
|
2024-09-04 14:02:13.000494 |
54 |
89168150 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.858591666666666,23.858588333333334
Longitude : 88.51756666666667,88.51758166666666
file name : Image_30082024132254145.png
|
2024-08-30 13:22:54.50422 |
55 |
89168150 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.858679999999996,23.858648333333335
Longitude : 88.51757,88.51757333333335
file name : Image_29082024171212130.png
|
2024-08-29 17:12:12.334434 |
56 |
89168150 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.858649999999997,23.85866
Longitude : 88.517585,88.51758
file name : Image_29082024170406258.png
|
2024-08-29 17:04:06.354654 |
57 |
89172303 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.872136666666666,23.872221666666665
Longitude : 88.53708666666668,88.53706500000001
file name : Image_30082024124537945.png
|
2024-08-30 12:45:38.585733 |
58 |
89172303 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.8722,23.872118333333333
Longitude : 88.53703666666667,88.53698333333332
file name : Image_30082024124008221.png
|
2024-08-30 12:40:08.798009 |
59 |
89172303 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.872183333333336,23.872176666666665
Longitude : 88.53704833333335,88.53703333333333
file name : Image_30082024123410594.png
|
2024-08-30 12:34:11.087054 |
60 |
64480183 |
Toilet at Haripur Madrasha at Haripur |
350000 |
Toilet at Haripur Madrasha at Haripur1 |
Roof laid |
-
latitude : 23.835489999999997
Longitude : 88.54476500000001
file name : Image_20022023150642046.png
|
2023-02-20 15:06:42.133679 |
61 |
64480183 |
Toilet at Haripur Madrasha at Haripur |
350000 |
Toilet at Haripur Madrasha at Haripur1 |
Completion of work |
-
latitude : 23.8518095
Longitude : 88.545531
file name : Image_20022023144444867.png
|
2023-02-20 14:44:45.060369 |
62 |
59668756 |
Con of PCC road from H/O Binoy Majumder to Vim Sarkar at Bagadoba |
300000 |
Construction of PCC road from the H/O Binay Biswas to the H/O Bhim Sarkar at Baghadoba Under Chhitka GP |
Roof laid |
-
latitude : 23.875549999999997,23.8755428
Longitude : 88.54474666666668,88.5446728
file name : Image_06032023134433807.png
|
2023-03-06 13:44:33.907882 |
63 |
59668756 |
Con of PCC road from H/O Binoy Majumder to Vim Sarkar at Bagadoba |
300000 |
Construction of PCC road from the H/O Binay Biswas to the H/O Bhim Sarkar at Baghadoba Under Chhitka GP |
Plinth level |
-
latitude : 23.875422,23.8755134
Longitude : 88.5446653,88.5446327
file name : Image_06032023133656150.png
|
2023-03-06 13:36:56.255596 |
64 |
59668756 |
Con of PCC road from H/O Binoy Majumder to Vim Sarkar at Bagadoba |
300000 |
Construction of PCC road from the H/O Binay Biswas to the H/O Bhim Sarkar at Baghadoba Under Chhitka GP |
Completion of work |
-
latitude : 23.8755251,23.8755251
Longitude : 88.5446694,88.5446694
file name : Image_04032023134430208.png
|
2023-03-04 13:44:30.303652 |
65 |
59697292 |
Construction of PCC road fro H/O Parimal Sarkar to Santiranjan Roy Dhankhola rasta at Haripur |
225000 |
Construction of PCC road fro H/O Parimal Sarkar to Santiranjan Roy Dhankhola rasta at Haripur1 |
Completion of work |
-
latitude : 23.8717982,23.8717982
Longitude : 88.5362373,88.5362373
file name : Image_13032023115634085.png
|
2023-03-13 11:56:34.172306 |
66 |
59697292 |
Construction of PCC road fro H/O Parimal Sarkar to Santiranjan Roy Dhankhola rasta at Haripur |
225000 |
Construction of PCC road fro H/O Parimal Sarkar to Santiranjan Roy Dhankhola rasta at Haripur1 |
Completion of work |
-
latitude : 23.8518014,23.8518014
Longitude : 88.5455191,88.5455191
file name : Image_10032023122135923.png
|
2023-03-10 12:21:36.01867 |
67 |
67201318 |
construction of PCC Road from h/o Binoy Majumder to h/o Bhim Sarkar at Bagadoba |
350000 |
construction of PCC Road from h/o Binoy Majumder to h/o Bhim Sarkar at Bagadoba1 |
Roof laid |
-
latitude : 23.8755251,23.8755251
Longitude : 88.5446694,88.5446694
file name : Image_13032023142124454.png
|
2023-03-13 14:21:24.569828 |
68 |
59723823 |
Cons of drain of 169 no DTW at Mobarakpur |
279926 |
Construction of Agricultural Pucca drain of 169 no. DTW at Mobarakpur under Chhitka GP |
Roof laid |
-
latitude : 23.83575,23.835735
Longitude : 88.561235,88.56125333333333
file name : Image_27032023131829464.png
|
2023-03-27 13:18:29.56874 |
69 |
59723823 |
Cons of drain of 169 no DTW at Mobarakpur |
279926 |
Construction of Agricultural Pucca drain of 169 no. DTW at Mobarakpur under Chhitka GP |
Completion of work |
-
latitude : 23.195771666666662,23.835711666666665
Longitude : 88.53405166666668,88.56126166666667
file name : Image_27032023131440403.png
|
2023-03-27 13:14:40.504567 |
70 |
59724462 |
Drain from L/O Prasenjit Halder to Nipul Barai 458 no DTW at Ilsamari |
279639 |
Drain from L/O Prasenjit Halder to Nipul Barai 458 no DTW at Ilsamari1 |
Plinth level |
-
latitude : 23.8517881,23.8517923
Longitude : 88.5455492,88.54555
file name : Image_12072024160758565.png
|
2024-07-12 16:07:58.531274 |
71 |
59724462 |
Drain from L/O Prasenjit Halder to Nipul Barai 458 no DTW at Ilsamari |
279639 |
Drain from L/O Prasenjit Halder to Nipul Barai 458 no DTW at Ilsamari1 |
Completion of work |
-
latitude : 23.852803333333334,23.85279666666667
Longitude : 88.55822666666667,88.55820833333334
file name : Image_24032023133107138.png
|
2023-03-24 13:31:07.26014 |
72 |
59724462 |
Drain from L/O Prasenjit Halder to Nipul Barai 458 no DTW at Ilsamari |
279639 |
Drain from L/O Prasenjit Halder to Nipul Barai 458 no DTW at Ilsamari1 |
Completion of work |
-
latitude : 23.852768333333334,23.852776666666667
Longitude : 88.55820999999999,88.55817499999999
file name : Image_24032023132200534.png
|
2023-03-24 13:22:00.643213 |
73 |
67311581 |
Augmentation of the existing source of drinking water |
69959 |
Installation of water purifier at Nazirpur Girls school Under Chhitka GP (Blue Star |
Roof laid |
-
latitude : 23.87479
Longitude : 88.53546
file name : Image_27042023151132756.png
|
2023-04-27 15:11:32.853675 |
74 |
67311581 |
Augmentation of the existing source of drinking water |
69959 |
Installation of water purifier at Nazirpur Girls school Under Chhitka GP (Blue Star |
Roof laid |
-
latitude : 23.87485333333333
Longitude : 88.53544333333333
file name : Image_27042023151125353.png
|
2023-04-27 15:11:25.451115 |
75 |
67311581 |
Augmentation of the existing source of drinking water |
69959 |
Installation of water purifier at Nazirpur Girls school Under Chhitka GP (Blue Star |
Roof laid |
-
latitude : 23.874806666666668
Longitude : 88.53539500000001
file name : Image_27042023150750145.png
|
2023-04-27 15:07:50.245952 |
76 |
67311581 |
Augmentation of the existing source of drinking water |
69959 |
Installation of water purifier at Nazirpur Girls school Under Chhitka GP (Blue Star |
Roof laid |
-
latitude : 23.874765000000004
Longitude : 88.53544333333333
file name : Image_27042023150745400.png
|
2023-04-27 15:07:45.597069 |
77 |
67311581 |
Augmentation of the existing source of drinking water |
69959 |
Installation of water purifier at Nazirpur Girls school Under Chhitka GP (Blue Star |
Roof laid |
-
latitude : 23.874771666666668
Longitude : 88.535335
file name : Image_27042023151138872.png
|
2023-04-27 15:11:39.006372 |
78 |
68618363 |
Repair of drainage channel |
300000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 23.855175
Longitude : 88.52562166666667
file name : Image_08042024155846450.png
|
2024-04-08 15:58:46.541157 |
79 |
64480088 |
Comunity Toilet near Gobinda mandir at mobarakpur |
350000 |
Comunity Toilet near Gobinda mandir at mobarakpur1 |
Roof laid |
-
latitude : 23.8518088
Longitude : 88.5455683
file name : Image_11052023130231015.png
|
2023-05-11 13:02:31.123074 |
80 |
64480088 |
Comunity Toilet near Gobinda mandir at mobarakpur |
350000 |
Comunity Toilet near Gobinda mandir at mobarakpur1 |
Completion of work |
-
latitude : 23.839186666666667
Longitude : 88.57629999999999
file name : Image_04052023131450791.png
|
2023-05-04 13:14:50.892024 |
81 |
64480088 |
Comunity Toilet near Gobinda mandir at mobarakpur |
350000 |
Comunity Toilet near Gobinda mandir at mobarakpur1 |
Completion of work |
-
latitude : 23.1975022
Longitude : 88.5364403
file name : Image_04052023114709536.png
|
2023-05-04 11:47:09.633031 |
82 |
67311648 |
Creation of a new source of drinking water |
69959 |
Construction of toilets in public institutions |
Roof laid |
-
latitude : 23.85818
Longitude : 88.55621000000001
file name : Image_04052023131453774.png
|
2023-05-04 13:14:53.872692 |
83 |
76489550 |
Construction of toilets in public institutions |
350000 |
toilet MIRGI MSK |
Roof laid |
-
latitude : 23.8465749
Longitude : 88.5406754
file name : Image_01062023155008286.png
|
2023-06-01 15:50:08.42798 |
84 |
69565627 |
Drainage Construction |
300000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.858020000000003
Longitude : 88.55698166666667
file name : Image_09042024151911611.png
|
2024-04-09 15:19:11.69861 |
85 |
69565627 |
Drainage Construction |
300000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.85804666666667
Longitude : 88.55701166666668
file name : Image_09042024145958415.png
|
2024-04-09 14:59:58.502493 |
86 |
69565627 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.85787833333333
Longitude : 88.55618000000001
file name : Image_08042024125037648.png
|
2024-04-08 12:50:37.748754 |
87 |
86874107 |
Construction of PCC Road form the h/o Anil to the h/o Manoj Biswas at Haripur Mandal |
50000 |
Construction of PCC Road form the h/o Anil to the h/o Manoj Biswas at Haripur Mandal 1 |
Plinth level |
-
latitude : 23.8517921,23.851794
Longitude : 88.5455438,88.5455442
file name : Image_15072024130817954.png
|
2024-07-15 13:08:18.315745 |
88 |
86874107 |
Construction of PCC Road form the h/o Anil to the h/o Manoj Biswas at Haripur Mandal |
50000 |
Construction of PCC Road form the h/o Anil to the h/o Manoj Biswas at Haripur Mandal 1 |
Completion of work |
-
latitude : 23.8517932,23.8517926,23.8517926
Longitude : 88.5455501,88.5455487,88.5455487
file name : Image_15072024124838049.png
|
2024-07-15 12:48:38.110722 |
89 |
86874107 |
Construction of PCC Road form the h/o Anil to the h/o Manoj Biswas at Haripur Mandal |
50000 |
Construction of PCC Road form the h/o Anil to the h/o Manoj Biswas at Haripur Mandal 1 |
Completion of work |
-
latitude : 23.836100000000002,23.836098333333332
Longitude : 88.55562499999999,88.55561333333331
file name : Image_07082023132908977.png
|
2023-08-07 13:29:09.108908 |
90 |
69560241 |
Construction of toilets in public institutions |
350000 |
Construction of a Community toilet at gokul Sadhur Ashram at Maniknagar under Chhitka GP |
Roof laid |
-
latitude : 23.8756185
Longitude : 88.5404283
file name : Image_01022024145947401.png
|
2024-02-01 14:59:47.525948 |
91 |
69560241 |
Construction of toilets in public institutions |
350000 |
Construction of a Community toilet at gokul Sadhur Ashram at Maniknagar under Chhitka GP |
Plinth level |
-
latitude : 23.8755171
Longitude : 88.5403881
file name : Image_04012024121140222.png
|
2024-01-04 12:11:40.418196 |
92 |
69560241 |
Construction of toilets in public institutions |
350000 |
Construction of a Community toilet at gokul Sadhur Ashram at Maniknagar under Chhitka GP |
Completion of work |
-
latitude : 23.8755143
Longitude : 88.5404013
file name : Image_04012024120043001.png
|
2024-01-04 12:00:43.0853 |
93 |
69560241 |
Construction of toilets in public institutions |
350000 |
Construction of a Community toilet at gokul Sadhur Ashram at Maniknagar under Chhitka GP |
Completion of work |
-
latitude : 23.8755238
Longitude : 88.5404017
file name : Image_03012024170000619.png
|
2024-01-03 17:00:00.725735 |
94 |
60491086 |
construction of community toilet near kabar sthan mrigi para under chhitka gp |
349905 |
construction of community toilet near kabar sthan mrigi para under chhitka gp1 |
Plinth level |
-
latitude : 23.7356218
Longitude : 88.5232241
file name : Image_13012024125206633.png
|
2024-01-13 12:52:06.736951 |
95 |
60491086 |
construction of community toilet near kabar sthan mrigi para under chhitka gp |
349905 |
construction of community toilet near kabar sthan mrigi para under chhitka gp1 |
Completion of work |
-
latitude : 23.862363947555423
Longitude : 88.50978495553136
file name : Image_06042022090104932.png
|
2022-04-06 09:01:05.022314 |
96 |
35135236 |
PCC road from Sanjoy Bala to Bibhuti Bhusan Mandal |
193637 |
PCC road from Sanjoy Bala to Bibhuti Bhusan Mandal 1 |
Plinth level |
-
latitude : 23.7356216,23.7356216
Longitude : 88.5232235,88.523224
file name : Image_13012024132457758.png
|
2024-01-13 13:24:57.855458 |
97 |
35135236 |
PCC road from Sanjoy Bala to Bibhuti Bhusan Mandal |
193637 |
PCC road from Sanjoy Bala to Bibhuti Bhusan Mandal 1 |
Plinth level |
-
latitude : 23.8556667,23.8556667
Longitude : 88.5489178,88.5489178
file name : Image_13122023143247713.png
|
2023-12-13 14:32:47.830161 |
98 |
35135236 |
PCC road from Sanjoy Bala to Bibhuti Bhusan Mandal |
193637 |
PCC road from Sanjoy Bala to Bibhuti Bhusan Mandal 1 |
Completion of work |
-
latitude : 23.8666007,23.8666007
Longitude : 88.5187499,88.5187499
file name : Image_18082021121753572.png
|
2021-08-18 12:17:53.65901 |
99 |
35248741 |
PCC road from Surya Biswas to Sunil Bairagya at Chhitka |
234171 |
PCC road from Surya Biswas to Sunil Bairagya at Chhitka 1 |
Plinth level |
-
latitude : 23.7356216,23.7356216
Longitude : 88.5232241,88.5232241
file name : Image_13012024132707198.png
|
2024-01-13 13:27:07.475849 |
100 |
35248741 |
PCC road from Surya Biswas to Sunil Bairagya at Chhitka |
234171 |
PCC road from Surya Biswas to Sunil Bairagya at Chhitka 1 |
Completion of work |
-
latitude : 23.858930384740233,23.85893101338297
Longitude : 88.53289696387947,88.53289486840367
file name : Image_25022022160523738.png
|
2022-02-25 16:05:23.780876 |
101 |
35251925 |
PCC road from Haren Bala to Haradhan Bala at Astullanagar |
495875 |
PCC road from Haren Bala to Haradhan Bala at Astullanagar 1 |
Plinth level |
-
latitude : 23.7356217,23.7356217
Longitude : 88.523224,88.523224
file name : Image_13012024133843295.png
|
2024-01-13 13:38:43.392579 |
102 |
35251925 |
PCC road from Haren Bala to Haradhan Bala at Astullanagar |
495875 |
PCC road from Haren Bala to Haradhan Bala at Astullanagar 1 |
Plinth level |
-
latitude : 23.860471666666665,23.860471666666665
Longitude : 88.55822333333332,88.55822333333332
file name : Image_13122023144718147.png
|
2023-12-13 14:47:18.277458 |
103 |
35251925 |
PCC road from Haren Bala to Haradhan Bala at Astullanagar |
495875 |
PCC road from Haren Bala to Haradhan Bala at Astullanagar 1 |
Completion of work |
-
latitude : 23.861091784201562,23.86127522215247
Longitude : 88.55828231200576,88.55834517627954
file name : Image_26022022150212800.png
|
2022-02-26 15:02:12.843194 |
104 |
35251925 |
PCC road from Haren Bala to Haradhan Bala at Astullanagar |
495875 |
PCC road from Haren Bala to Haradhan Bala at Astullanagar 1 |
Completion of work |
-
latitude : 23.859361382201314,23.86050308123231
Longitude : 88.55850962921977,88.55830259621143
file name : Image_22082021181826871.png
|
2021-08-22 18:18:26.93028 |
105 |
35252823 |
PCC road from H/O Amam Biswas to Sanjoy Choudhury |
256922 |
PCC road from H/O Amam Biswas to Sanjoy Choudhury1 |
Plinth level |
-
latitude : 23.7356214,23.7356389
Longitude : 88.5232242,88.5232386
file name : Image_13012024131451637.png
|
2024-01-13 13:14:51.740972 |
106 |
35252823 |
PCC road from H/O Amam Biswas to Sanjoy Choudhury |
256922 |
PCC road from H/O Amam Biswas to Sanjoy Choudhury1 |
Completion of work |
-
latitude : 23.872570591047406,23.872601562179625
Longitude : 88.57546404004097,88.57550938613713
file name : Image_16032022161009492.png
|
2022-03-16 16:10:09.548417 |
107 |
39068860 |
Construction of Drain near one three six DTW |
114896 |
Construction of Drain near one three six DTW1 |
Plinth level |
-
latitude : 23.8518396,23.8518396
Longitude : 88.5455639,88.5455639
file name : Image_19012024133537985.png
|
2024-01-19 13:35:38.090784 |
108 |
39068860 |
Construction of Drain near one three six DTW |
114896 |
Construction of Drain near one three six DTW1 |
Completion of work |
-
latitude : 23.7356215,23.7356215
Longitude : 88.5232242,88.5232242
file name : Image_13012024135746051.png
|
2024-01-13 13:57:46.142359 |
109 |
39068860 |
Construction of Drain near one three six DTW |
114896 |
Construction of Drain near one three six DTW1 |
Completion of work |
-
latitude : 23.843334931880236,23.843326382339
Longitude : 88.54300377890468,88.54302967898548
file name : Image_22082021175859736.png
|
2021-08-22 17:58:59.833195 |
110 |
39071360 |
Construction of Drain of DTW at Mrigi Dhuluripara |
347563 |
Construction of Drain of DTW at Mrigi Dhuluripara 1 |
Plinth level |
-
latitude : 23.7356215,23.7356215
Longitude : 88.5232243,88.5232246
file name : Image_13012024173132395.png
|
2024-01-13 17:31:32.488427 |
111 |
39071360 |
Construction of Drain of DTW at Mrigi Dhuluripara |
347563 |
Construction of Drain of DTW at Mrigi Dhuluripara 1 |
Completion of work |
-
latitude : 23.7356217,23.7356217
Longitude : 88.5232243,88.5232237
file name : Image_13012024140715877.png
|
2024-01-13 14:07:15.962054 |
112 |
39071360 |
Construction of Drain of DTW at Mrigi Dhuluripara |
347563 |
Construction of Drain of DTW at Mrigi Dhuluripara 1 |
Completion of work |
-
latitude : 23.84669976308942,23.846686016768217
Longitude : 88.53088078089058,88.53088111616671
file name : Image_22082021173015108.png
|
2021-08-22 17:30:15.186774 |
113 |
60486091 |
construction of pacca drain from rateneswar halder to balai biswas via kalipada bhakta of 5 no spout |
349454 |
construction of pacca drain from rateneswar halder to balai biswas via kalipada bhakta of 5 no spout1 |
Plinth level |
-
latitude : 23.7356218,23.7356215
Longitude : 88.5232241,88.523224
file name : Image_13012024141049580.png
|
2024-01-13 14:10:49.667951 |
114 |
60486091 |
construction of pacca drain from rateneswar halder to balai biswas via kalipada bhakta of 5 no spout |
349454 |
construction of pacca drain from rateneswar halder to balai biswas via kalipada bhakta of 5 no spout1 |
Completion of work |
-
latitude : 23.8456027,23.8456027
Longitude : 88.5487807,88.5487807
file name : Image_24022022180429126.png
|
2022-02-24 18:04:29.19724 |
115 |
60486640 |
construction of agricaltural pacca drain from land of bimal biswas to land of rabindranath at 8no |
347563 |
construction of agricaltural pacca drain from land of bimal biswas to land of rabindranath at 8no 1 |
Plinth level |
-
latitude : 23.7356214,23.7356216
Longitude : 88.5232206,88.5232243
file name : Image_13012024141418106.png
|
2024-01-13 14:14:18.221621 |
116 |
60486640 |
construction of agricaltural pacca drain from land of bimal biswas to land of rabindranath at 8no |
347563 |
construction of agricaltural pacca drain from land of bimal biswas to land of rabindranath at 8no 1 |
Completion of work |
-
latitude : 23.858557054772973,23.858557054772973
Longitude : 88.52828096598387,88.52828096598387
file name : Image_26022022142507184.png
|
2022-02-26 14:25:07.272534 |
117 |
61153529 |
PCC Road From Radha Gobinda Mandir to Pari Biswas |
192013 |
PCC Road From Radha Gobinda Mandir to Pari Biswas1 |
Plinth level |
-
latitude : 23.73555,23.7356203
Longitude : 88.5231777,88.5231927
file name : Image_13012024141628724.png
|
2024-01-13 14:16:28.820486 |
118 |
61153529 |
PCC Road From Radha Gobinda Mandir to Pari Biswas |
192013 |
PCC Road From Radha Gobinda Mandir to Pari Biswas1 |
Completion of work |
-
latitude : 23.86829007882625,23.86829007882625
Longitude : 88.5410909447819,88.5410909447819
file name : Image_25022022160519605.png
|
2022-02-25 16:05:19.637485 |
119 |
49418312 |
Improvement of Concrete Road at Astullanagar House of Kumud Biswas to Suresh Biswas |
350000 |
Improvement of Concrete Road at Astullanagar House of Kumud Biswas to Suresh Biswas1 |
Plinth level |
-
latitude : 23.7356264,23.7356215
Longitude : 88.5232247,88.523224
file name : Image_13012024153658977.png
|
2024-01-13 15:36:58.667309 |
120 |
49418312 |
Improvement of Concrete Road at Astullanagar House of Kumud Biswas to Suresh Biswas |
350000 |
Improvement of Concrete Road at Astullanagar House of Kumud Biswas to Suresh Biswas1 |
Completion of work |
-
latitude : 23.7356217,23.7356217
Longitude : 88.5232243,88.5232243
file name : Image_13012024152309368.png
|
2024-01-13 15:23:09.545729 |
121 |
49418312 |
Improvement of Concrete Road at Astullanagar House of Kumud Biswas to Suresh Biswas |
350000 |
Improvement of Concrete Road at Astullanagar House of Kumud Biswas to Suresh Biswas1 |
Completion of work |
-
latitude : 23.7356264,23.7356264
Longitude : 88.5232247,88.5232247
file name : Image_13012024145120627.png
|
2024-01-13 14:51:20.729155 |
122 |
49418312 |
Improvement of Concrete Road at Astullanagar House of Kumud Biswas to Suresh Biswas |
350000 |
Improvement of Concrete Road at Astullanagar House of Kumud Biswas to Suresh Biswas1 |
Completion of work |
-
latitude : 23.858535513281822,23.85854607447982
Longitude : 88.55525812134147,88.55608306825161
file name : Image_12052022085429302.png
|
2022-05-12 08:54:29.399291 |
123 |
49422936 |
Blacktop Road at Dangapara Nilkhuthi Kalimandir to House Pronath |
350000 |
Blacktop Road at Dangapara Nilkhuthi Kalimandir to House Pronath1 |
Plinth level |
-
latitude : 23.7356264,23.7356175
Longitude : 88.5232247,88.5232183
file name : Image_13012024152511471.png
|
2024-01-13 15:25:11.69762 |
124 |
49422936 |
Blacktop Road at Dangapara Nilkhuthi Kalimandir to House Pronath |
350000 |
Blacktop Road at Dangapara Nilkhuthi Kalimandir to House Pronath1 |
Plinth level |
-
latitude : 23.7356264,23.7356264
Longitude : 88.5232247,88.5232247
file name : Image_13012024150034968.png
|
2024-01-13 15:00:35.203392 |
125 |
49422936 |
Blacktop Road at Dangapara Nilkhuthi Kalimandir to House Pronath |
350000 |
Blacktop Road at Dangapara Nilkhuthi Kalimandir to House Pronath1 |
Completion of work |
-
latitude : 23.8517902,23.8517902
Longitude : 88.5455663,88.5455663
file name : Image_19122022161958133.png
|
2022-12-19 16:19:58.237238 |
126 |
49429141 |
Construction of Concrete Drain 7 nos Chamber Deep tuble Well at Mrigi Natunpara |
350000 |
Construction of Concrete Drain 7 nos Chamber Deep tuble Well at Mrigi Natunpara1 |
Plinth level |
-
latitude : 23.7356217,23.7356217
Longitude : 88.5232245,88.5232245
file name : Image_13012024150040684.png
|
2024-01-13 15:00:40.892959 |
127 |
49429141 |
Construction of Concrete Drain 7 nos Chamber Deep tuble Well at Mrigi Natunpara |
350000 |
Construction of Concrete Drain 7 nos Chamber Deep tuble Well at Mrigi Natunpara1 |
Completion of work |
-
latitude : 23.859755000000003,23.85974666666667
Longitude : 88.52617833333333,88.52619000000001
file name : Image_20012023123207209.png
|
2023-01-20 12:32:07.298585 |
128 |
49429141 |
Construction of Concrete Drain 7 nos Chamber Deep tuble Well at Mrigi Natunpara |
350000 |
Construction of Concrete Drain 7 nos Chamber Deep tuble Well at Mrigi Natunpara1 |
Completion of work |
-
latitude : 23.859738333333333,23.859798333333334
Longitude : 88.52616833333335,88.52614999999999
file name : Image_20012023122128386.png
|
2023-01-20 12:21:28.481097 |
129 |
49429141 |
Construction of Concrete Drain 7 nos Chamber Deep tuble Well at Mrigi Natunpara |
350000 |
Construction of Concrete Drain 7 nos Chamber Deep tuble Well at Mrigi Natunpara1 |
Completion of work |
-
latitude : 23.859471666666664,23.859471666666664
Longitude : 88.52691000000002,88.52692
file name : Image_18012023151715863.png
|
2023-01-18 15:17:15.980072 |
130 |
49429634 |
Construction of Concrete Drainat Land of Nityananda Haldar to 5 nos Sport at Mobarakpur |
350000 |
Construction of Concrete Drainat Land of Nityananda Haldar to 5 nos Sport at Mobarakpur1 |
Plinth level |
-
latitude : 23.7356213,23.7356213
Longitude : 88.5232245,88.5232245
file name : Image_13012024150430029.png
|
2024-01-13 15:04:30.202562 |
131 |
49429634 |
Construction of Concrete Drainat Land of Nityananda Haldar to 5 nos Sport at Mobarakpur |
350000 |
Construction of Concrete Drainat Land of Nityananda Haldar to 5 nos Sport at Mobarakpur1 |
Plinth level |
-
latitude : 23.735634,23.7356218
Longitude : 88.5232243,88.5232241
file name : Image_13012024144456079.png
|
2024-01-13 14:44:56.360915 |
132 |
49429634 |
Construction of Concrete Drainat Land of Nityananda Haldar to 5 nos Sport at Mobarakpur |
350000 |
Construction of Concrete Drainat Land of Nityananda Haldar to 5 nos Sport at Mobarakpur1 |
Completion of work |
-
latitude : 23.833974190056324,23.834029426798224
Longitude : 88.5598446149379,88.55975962243974
file name : Image_18052022181327225.png
|
2022-05-18 18:13:27.278847 |
133 |
49423077 |
Concrete Road at Chhitka Pacca Rasta to House of Rabi Biswas Via Profulla Bagchi and Prodip Biswas |
350000 |
Concrete Road at Chhitka Pacca Rasta to House of Rabi Biswas Via Profulla Bagchi and Prodip Biswas1 |
Plinth level |
-
latitude : 23.7356255,23.7356264
Longitude : 88.523221,88.5232247
file name : Image_13012024154341704.png
|
2024-01-13 15:43:41.868921 |
134 |
49423077 |
Concrete Road at Chhitka Pacca Rasta to House of Rabi Biswas Via Profulla Bagchi and Prodip Biswas |
350000 |
Concrete Road at Chhitka Pacca Rasta to House of Rabi Biswas Via Profulla Bagchi and Prodip Biswas1 |
Completion of work |
-
latitude : 23.735649,23.7356264
Longitude : 88.5231633,88.5232247
file name : Image_13012024152646473.png
|
2024-01-13 15:26:46.719314 |
135 |
49423077 |
Concrete Road at Chhitka Pacca Rasta to House of Rabi Biswas Via Profulla Bagchi and Prodip Biswas |
350000 |
Concrete Road at Chhitka Pacca Rasta to House of Rabi Biswas Via Profulla Bagchi and Prodip Biswas1 |
Completion of work |
-
latitude : 23.7356169,23.7356172
Longitude : 88.5232169,88.5232346
file name : Image_13012024150037805.png
|
2024-01-13 15:00:38.065011 |
136 |
49423077 |
Concrete Road at Chhitka Pacca Rasta to House of Rabi Biswas Via Profulla Bagchi and Prodip Biswas |
350000 |
Concrete Road at Chhitka Pacca Rasta to House of Rabi Biswas Via Profulla Bagchi and Prodip Biswas1 |
Completion of work |
-
latitude : 23.844941155984998,23.84486676659435
Longitude : 88.54954878799617,88.54958667419851
file name : Image_23052022123607192.png
|
2022-05-23 12:36:07.278516 |
137 |
49429588 |
Construction of Concrete Drainat 136 nos Gabhir Nalkup at Chhitka |
350000 |
Construction of Concrete Drainat 136 nos Gabhir Nalkup at Chhitka1 |
Plinth level |
-
latitude : 23.7356264,23.7356264
Longitude : 88.5232247,88.5232247
file name : Image_13012024151023567.png
|
2024-01-13 15:10:23.843465 |
138 |
49429588 |
Construction of Concrete Drainat 136 nos Gabhir Nalkup at Chhitka |
350000 |
Construction of Concrete Drainat 136 nos Gabhir Nalkup at Chhitka1 |
Completion of work |
-
latitude : 23.84347,23.8434701
Longitude : 88.5429935,88.5429946
file name : Image_16082022180419036.png
|
2022-08-16 18:04:19.086679 |
139 |
64459359 |
Construction of Shed near Haripur Kalimandir at Haripur |
350000 |
Construction of Shed near Haripur Kalimandir at Haripur1 |
Plinth level |
-
latitude : 23.7356255
Longitude : 88.5232205
file name : Image_13012024170129141.png
|
2024-01-13 17:01:29.303924 |
140 |
64459359 |
Construction of Shed near Haripur Kalimandir at Haripur |
350000 |
Construction of Shed near Haripur Kalimandir at Haripur1 |
Completion of work |
-
latitude : 23.7356264
Longitude : 88.5232247
file name : Image_13012024151029278.png
|
2024-01-13 15:10:29.488613 |
141 |
64459359 |
Construction of Shed near Haripur Kalimandir at Haripur |
350000 |
Construction of Shed near Haripur Kalimandir at Haripur1 |
Completion of work |
-
latitude : 23.8353791
Longitude : 88.5545912
file name : Image_21082023155838745.png
|
2023-08-21 15:58:38.98609 |
142 |
64459359 |
Construction of Shed near Haripur Kalimandir at Haripur |
350000 |
Construction of Shed near Haripur Kalimandir at Haripur1 |
Completion of work |
-
latitude : 23.851825
Longitude : 88.5455569
file name : Image_20082023163425895.png
|
2023-08-20 16:34:25.990668 |
143 |
49424219 |
Concrete Road at Nazirpur Daspara Temple to House of Lipi Das |
350000 |
Concrete Road at Nazirpur Daspara Temple to House of Lipi Das1 |
Plinth level |
-
latitude : 23.7356338,23.7356338
Longitude : 88.5232241,88.5232241
file name : Image_13012024163752002.png
|
2024-01-13 16:37:52.17644 |
144 |
49424219 |
Concrete Road at Nazirpur Daspara Temple to House of Lipi Das |
350000 |
Concrete Road at Nazirpur Daspara Temple to House of Lipi Das1 |
Completion of work |
-
latitude : 23.872761949896812,23.872766350395977
Longitude : 88.53433462791145,88.534333454445
file name : Image_12052022080823345.png
|
2022-05-12 08:08:23.410116 |
145 |
64480292 |
drain of 136 no deep tubewell near 2 no chamber from l/o haran molla to l/o amzad mondal |
350000 |
drain of 136 no deep tubewell near 2 no chamber from l/o haran molla to l/o amzad mondal 1 |
Plinth level |
-
latitude : 23.7356215,23.7356214
Longitude : 88.5232243,88.5232244
file name : Image_13012024155707998.png
|
2024-01-13 15:57:08.144657 |
146 |
64480292 |
drain of 136 no deep tubewell near 2 no chamber from l/o haran molla to l/o amzad mondal |
350000 |
drain of 136 no deep tubewell near 2 no chamber from l/o haran molla to l/o amzad mondal 1 |
Completion of work |
-
latitude : 23.7356216,23.7356216
Longitude : 88.523224,88.523224
file name : Image_13012024154953175.png
|
2024-01-13 15:49:53.396484 |
147 |
64480292 |
drain of 136 no deep tubewell near 2 no chamber from l/o haran molla to l/o amzad mondal |
350000 |
drain of 136 no deep tubewell near 2 no chamber from l/o haran molla to l/o amzad mondal 1 |
Completion of work |
-
latitude : 23.7356218,23.7356214
Longitude : 88.5232239,88.5232243
file name : Image_13012024152147947.png
|
2024-01-13 15:21:48.20601 |
148 |
64480292 |
drain of 136 no deep tubewell near 2 no chamber from l/o haran molla to l/o amzad mondal |
350000 |
drain of 136 no deep tubewell near 2 no chamber from l/o haran molla to l/o amzad mondal 1 |
Completion of work |
-
latitude : 23.84371833333333,23.843711666666664
Longitude : 88.54768,88.54768
file name : Image_19122022144408435.png
|
2022-12-19 14:44:08.564189 |
149 |
64459453 |
Reparing of BT road from h/o sudhir biswas to bhuttala at khanjipur |
350000 |
Reparing of BT road from h/o sudhir biswas to bhuttala at khanjipur1 |
Plinth level |
-
latitude : 23.7356218,23.7356218
Longitude : 88.523224,88.523224
file name : Image_13012024160014622.png
|
2024-01-13 16:00:14.829242 |
150 |
64459453 |
Reparing of BT road from h/o sudhir biswas to bhuttala at khanjipur |
350000 |
Reparing of BT road from h/o sudhir biswas to bhuttala at khanjipur1 |
Completion of work |
-
latitude : 23.875889999999995,23.875909999999998
Longitude : 88.57719999999999,88.57716833333333
file name : Image_27122022143816491.png
|
2022-12-27 14:38:16.61061 |
151 |
64459752 |
Additional Work of Wooden Bridge over Maraganga at Khanjipur |
350000 |
Additional Work of Wooden Bridge over Maraganga at Khanjipur1 |
Plinth level |
-
latitude : 23.7356217
Longitude : 88.5232244
file name : Image_13012024151854801.png
|
2024-01-13 15:18:55.253412 |
152 |
64459666 |
PCC Road from Kalimandir to Napel Saha via bikash Mondal at Nazirpur |
350000 |
PCC Road from Kalimandir to Napel Saha via bikash Mondal at Nazirpur1 |
Plinth level |
-
latitude : 23.7356218,23.7356218
Longitude : 88.5232241,88.5232241
file name : Image_13012024161519889.png
|
2024-01-13 16:15:19.988104 |
153 |
64459666 |
PCC Road from Kalimandir to Napel Saha via bikash Mondal at Nazirpur |
350000 |
PCC Road from Kalimandir to Napel Saha via bikash Mondal at Nazirpur1 |
Completion of work |
-
latitude : 23.873930000000005,23.873930000000005
Longitude : 88.53484166666667,88.53484166666667
file name : Image_19122022131755690.png
|
2022-12-19 13:17:55.771091 |
154 |
64480109 |
Toilet at Jagabandhu Ashram at Maniknagar |
350000 |
Toilet at Jagabandhu Ashram at Maniknagar1 |
Roof laid |
-
latitude : 23.8749909
Longitude : 88.5434514
file name : Image_11052023132426280.png
|
2023-05-11 13:24:26.415368 |
155 |
64480109 |
Toilet at Jagabandhu Ashram at Maniknagar |
350000 |
Toilet at Jagabandhu Ashram at Maniknagar1 |
Roof laid |
-
latitude : 23.8749798
Longitude : 88.5434986
file name : Image_30032023153653323.png
|
2023-03-30 15:36:53.419089 |
156 |
65640381 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.8412074,23.844455
Longitude : 88.5418368,88.54371666666665
file name : Image_27022023140422105.png
|
2023-02-27 14:04:22.198836 |
157 |
65640381 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.8412074,23.195913333333337
Longitude : 88.5418368,88.53424000000001
file name : Image_27022023135836066.png
|
2023-02-27 13:58:36.160785 |
158 |
64480163 |
Toilet near Haripur Bazar Milk Mil at Haripur |
350000 |
Toilet near Haripur Bazar Milk Mil at Haripur1 |
Roof laid |
-
latitude : 23.8369648
Longitude : 88.5527222
file name : Image_26052023155846275.png
|
2023-05-26 15:58:46.386122 |
159 |
64480163 |
Toilet near Haripur Bazar Milk Mil at Haripur |
350000 |
Toilet near Haripur Bazar Milk Mil at Haripur1 |
Roof laid |
-
latitude : 23.8369648
Longitude : 88.5527222
file name : Image_26052023155849301.png
|
2023-05-26 15:58:49.40197 |
160 |
64480163 |
Toilet near Haripur Bazar Milk Mil at Haripur |
350000 |
Toilet near Haripur Bazar Milk Mil at Haripur1 |
Roof laid |
-
latitude : 23.8369648
Longitude : 88.5527222
file name : Image_26052023155853405.png
|
2023-05-26 15:58:53.606622 |
161 |
64480163 |
Toilet near Haripur Bazar Milk Mil at Haripur |
350000 |
Toilet near Haripur Bazar Milk Mil at Haripur1 |
Completion of work |
-
latitude : 23.8369648
Longitude : 88.5527222
file name : Image_26052023151608501.png
|
2023-05-26 15:16:08.604339 |
162 |
64480163 |
Toilet near Haripur Bazar Milk Mil at Haripur |
350000 |
Toilet near Haripur Bazar Milk Mil at Haripur1 |
Completion of work |
-
latitude : 23.8369648
Longitude : 88.5527222
file name : Image_26052023151134319.png
|
2023-05-26 15:11:34.433783 |
163 |
64459558 |
PCC Road from land of Purna Baiai to towards Amal Mondal at Mirgi |
350000 |
PCC Road from land of Purna Baiai to towards Amal Mondal at Mirgi1 |
Plinth level |
-
latitude : 23.7356264,23.7356215,23.7356215
Longitude : 88.5232247,88.5232238,88.5232238
file name : Image_13012024162343820.png
|
2024-01-13 16:23:43.911677 |
164 |
64459558 |
PCC Road from land of Purna Baiai to towards Amal Mondal at Mirgi |
350000 |
PCC Road from land of Purna Baiai to towards Amal Mondal at Mirgi1 |
Completion of work |
-
latitude : 23.7356216,23.7356256
Longitude : 88.5232243,88.5232206
file name : Image_13012024151434957.png
|
2024-01-13 15:14:35.167251 |
165 |
64459558 |
PCC Road from land of Purna Baiai to towards Amal Mondal at Mirgi |
350000 |
PCC Road from land of Purna Baiai to towards Amal Mondal at Mirgi1 |
Completion of work |
-
latitude : 23.84863833333333,23.848523333333333,23.848499999999998
Longitude : 88.52912833333333,88.529125,88.52914166666666
file name : Image_29122022143659626.png
|
2022-12-29 14:36:59.751497 |
166 |
49417709 |
Improvement of Concrete Road at Khanjipur House of Prodip Roy to Paresh Majumdar |
300000 |
Improvement of Concrete Road at Khanjipur House of Prodip Roy to Paresh Majumdar1 |
Plinth level |
-
latitude : 23.7356339,23.7356338
Longitude : 88.523224,88.523224
file name : Image_13012024164144706.png
|
2024-01-13 16:41:44.85043 |
167 |
49417709 |
Improvement of Concrete Road at Khanjipur House of Prodip Roy to Paresh Majumdar |
300000 |
Improvement of Concrete Road at Khanjipur House of Prodip Roy to Paresh Majumdar1 |
Completion of work |
-
latitude : 23.8517902,23.8517902
Longitude : 88.5455663,88.5455663
file name : Image_21122022125336066.png
|
2022-12-21 12:53:36.20429 |
168 |
49417709 |
Improvement of Concrete Road at Khanjipur House of Prodip Roy to Paresh Majumdar |
300000 |
Improvement of Concrete Road at Khanjipur House of Prodip Roy to Paresh Majumdar1 |
Completion of work |
-
latitude : 23.8517902,23.8517902
Longitude : 88.5455663,88.5455663
file name : Image_21122022125532222.png
|
2022-12-21 12:55:32.351481 |
169 |
49423458 |
Blacktop Road at Mobarakpur House of Pramananda Hira to ICDS |
350000 |
Blacktop Road at Mobarakpur House of Pramananda Hira to ICDS1 |
Roof laid |
-
latitude : 23.8517893,23.8517893
Longitude : 88.5455376,88.5455376
file name : Image_27012023130320019.png
|
2023-01-27 13:03:20.101186 |
170 |
49423458 |
Blacktop Road at Mobarakpur House of Pramananda Hira to ICDS |
350000 |
Blacktop Road at Mobarakpur House of Pramananda Hira to ICDS1 |
Roof laid |
-
latitude : 23.851811,23.851811
Longitude : 88.5455166,88.5455166
file name : Image_27012023130326610.png
|
2023-01-27 13:03:26.696139 |
171 |
49423458 |
Blacktop Road at Mobarakpur House of Pramananda Hira to ICDS |
350000 |
Blacktop Road at Mobarakpur House of Pramananda Hira to ICDS1 |
Roof laid |
-
latitude : 23.851811,23.851811
Longitude : 88.5455166,88.5455166
file name : Image_27012023130333720.png
|
2023-01-27 13:03:33.802444 |
172 |
49423458 |
Blacktop Road at Mobarakpur House of Pramananda Hira to ICDS |
350000 |
Blacktop Road at Mobarakpur House of Pramananda Hira to ICDS1 |
Roof laid |
-
latitude : 23.839926666666663,23.839868333333335
Longitude : 88.56329333333333,88.563305
file name : Image_19012023154104623.png
|
2023-01-19 15:41:04.738774 |
173 |
64480376 |
Pucca Drain at DTW 497 of Chambar No4 at Dangapara |
350000 |
Pucca Drain at DTW 497 of Chambar No4 at Dangapara1 |
Roof laid |
-
latitude : 23.8517899,23.8517899
Longitude : 88.5455285,88.5455285
file name : Image_06012023132647814.png
|
2023-01-06 13:26:47.924599 |
174 |
64480376 |
Pucca Drain at DTW 497 of Chambar No4 at Dangapara |
350000 |
Pucca Drain at DTW 497 of Chambar No4 at Dangapara1 |
Completion of work |
-
latitude : 23.86226,23.86226166666667
Longitude : 88.53673666666667,88.53672499999999
file name : Image_03012023120715635.png
|
2023-01-03 12:07:15.741881 |
175 |
64459413 |
Construction of Shed near Land of Dhiren Biswas at Mobarakpur |
350000 |
Construction of Shed near Land of Dhiren Biswas at Mobarakpur1 |
Roof laid |
-
latitude : 23.8412345
Longitude : 88.5684081
file name : Image_30062023131802734.png
|
2023-06-30 13:18:02.847686 |
176 |
64459413 |
Construction of Shed near Land of Dhiren Biswas at Mobarakpur |
350000 |
Construction of Shed near Land of Dhiren Biswas at Mobarakpur1 |
Completion of work |
-
latitude : 23.8412111
Longitude : 88.5683987
file name : Image_30032023151755471.png
|
2023-03-30 15:17:55.570419 |
177 |
64480274 |
Pucca Drain of 3 no deep tubewall near 1 no chambar & 5 no Chamber west side |
350000 |
Pucca Drain of 3 no deep tubewall near 1 no chambar & 5 no Chamber west side1 |
Plinth level |
-
latitude : 23.7356217
Longitude : 88.5232243
file name : Image_13012024171531088.png
|
2024-01-13 17:15:31.289338 |
178 |
64480274 |
Pucca Drain of 3 no deep tubewall near 1 no chambar & 5 no Chamber west side |
350000 |
Pucca Drain of 3 no deep tubewall near 1 no chambar & 5 no Chamber west side1 |
Completion of work |
-
latitude : 23.846718333333335
Longitude : 88.544685
file name : Image_19122022145331437.png
|
2022-12-19 14:53:31.605658 |
179 |
64459195 |
PCC Road from Main road to h/o Hari Das at Mirgi |
350000 |
PCC Road from Main road to h/o Hari Das at Mirgi1 |
Plinth level |
-
latitude : 23.735634,23.7356339
Longitude : 88.5232243,88.5232244
file name : Image_13012024171837472.png
|
2024-01-13 17:18:37.602902 |
180 |
64459195 |
PCC Road from Main road to h/o Hari Das at Mirgi |
350000 |
PCC Road from Main road to h/o Hari Das at Mirgi1 |
Completion of work |
-
latitude : 23.7356253,23.7356214,23.7356214
Longitude : 88.5232208,88.5232239,88.5232239
file name : Image_13012024171301817.png
|
2024-01-13 17:13:01.958937 |
181 |
64459195 |
PCC Road from Main road to h/o Hari Das at Mirgi |
350000 |
PCC Road from Main road to h/o Hari Das at Mirgi1 |
Completion of work |
-
latitude : 23.7356264,23.7356264
Longitude : 88.5232247,88.5232247
file name : Image_13012024170700510.png
|
2024-01-13 17:07:00.683646 |
182 |
64459195 |
PCC Road from Main road to h/o Hari Das at Mirgi |
350000 |
PCC Road from Main road to h/o Hari Das at Mirgi1 |
Completion of work |
-
latitude : 23.7356264,23.7356211
Longitude : 88.5232247,88.5232235
file name : Image_13012024170335490.png
|
2024-01-13 17:03:35.664737 |
183 |
64459195 |
PCC Road from Main road to h/o Hari Das at Mirgi |
350000 |
PCC Road from Main road to h/o Hari Das at Mirgi1 |
Completion of work |
-
latitude : 23.858263333333337,23.858201666666666,23.858186666666665
Longitude : 88.51790666666666,88.51785333333333,88.51784333333332
file name : Image_29122022143705696.png
|
2022-12-29 14:37:05.816224 |
184 |
35272044 |
PCC road from Ramchandra Das to Laxman Das at Mobarakpur |
163040 |
PCC road from Ramchandra Das to Laxman Das at Mobarakpur1 |
Plinth level |
-
latitude : 23.7356255,23.7356345
Longitude : 88.5232207,88.523235
file name : Image_13012024172729106.png
|
2024-01-13 17:27:29.196491 |
185 |
35272044 |
PCC road from Ramchandra Das to Laxman Das at Mobarakpur |
163040 |
PCC road from Ramchandra Das to Laxman Das at Mobarakpur1 |
Completion of work |
-
latitude : 23.83983070962131,23.839862099848688
Longitude : 88.57608061283827,88.57620022259653
file name : Image_24022022170440227.png
|
2022-02-24 17:04:40.271673 |
186 |
89506819 |
Greywater management system |
350000 |
Greywater management system1 |
Roof laid |
-
latitude : 23.83548166666667
Longitude : 88.55850833333334
file name : Image_16012024154420355.png
|
2024-01-16 15:44:20.435998 |
187 |
89506819 |
Greywater management system |
350000 |
Greywater management system1 |
Plinth level |
-
latitude : 23.835486666666664
Longitude : 88.55856666666665
file name : Image_16012024154013993.png
|
2024-01-16 15:40:14.072748 |
188 |
89506819 |
Greywater management system |
350000 |
Greywater management system1 |
Completion of work |
-
latitude : 23.835536666666666
Longitude : 88.55836333333333
file name : Image_16012024153552627.png
|
2024-01-16 15:35:52.70962 |
189 |
89506234 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.85096
Longitude : 88.58861499999999
file name : Image_16012024161011185.png
|
2024-01-16 16:10:11.292519 |
190 |
89506234 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.850961666666663
Longitude : 88.58863333333332
file name : Image_16012024160757421.png
|
2024-01-16 16:07:57.523482 |
191 |
89506234 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.850968333333338
Longitude : 88.58861833333334
file name : Image_16012024160308431.png
|
2024-01-16 16:03:08.532305 |
192 |
69560900 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.873828333333336
Longitude : 88.57560833333334
file name : Image_16012024130536313.png
|
2024-01-16 13:05:36.415698 |
193 |
69560900 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.87383333333333
Longitude : 88.57564833333332
file name : Image_15012024152839712.png
|
2024-01-15 15:28:39.822169 |
194 |
69560900 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.873845
Longitude : 88.57555166666667
file name : Image_15012024152406746.png
|
2024-01-15 15:24:06.880492 |
195 |
69561351 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.19596166666667
Longitude : 88.53445333333333
file name : Image_16012024123214707.png
|
2024-01-16 12:32:14.81893 |
196 |
69561351 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.84632
Longitude : 88.54679833333333
file name : Image_15012024142020059.png
|
2024-01-15 14:20:20.14988 |
197 |
69561351 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.846288333333337
Longitude : 88.54680000000002
file name : Image_15012024141516127.png
|
2024-01-15 14:15:16.227012 |
198 |
61153645 |
BT Road From Haripada Mistri to Ganesh Mistri at Mobarakpur |
173590 |
BT Road From Haripada Mistri to Ganesh Mistri at Mobarakpur1 |
Plinth level |
-
latitude : 23.7356216,23.7356254
Longitude : 88.5232243,88.5232206
file name : Image_13012024143952769.png
|
2024-01-13 14:39:52.852814 |
199 |
61153645 |
BT Road From Haripada Mistri to Ganesh Mistri at Mobarakpur |
173590 |
BT Road From Haripada Mistri to Ganesh Mistri at Mobarakpur1 |
Completion of work |
-
latitude : 23.838551337830722,23.838561144657433
Longitude : 88.55760647915304,88.55791409499943
file name : Image_24022022164709918.png
|
2022-02-24 16:47:09.988828 |
200 |
61153762 |
PCC Road From Bijay Halder to Rohit Halder at Haripur |
179270 |
PCC Road From Bijay Halder to Rohit Halder at Haripur1 |
Plinth level |
-
latitude : 23.8518396,23.8518396
Longitude : 88.5455639,88.5455639
file name : Image_19012024132824350.png
|
2024-01-19 13:28:24.463374 |
201 |
61153762 |
PCC Road From Bijay Halder to Rohit Halder at Haripur |
179270 |
PCC Road From Bijay Halder to Rohit Halder at Haripur1 |
Completion of work |
-
latitude : 23.7356475,23.7356475
Longitude : 88.5232351,88.5232351
file name : Image_13012024144005645.png
|
2024-01-13 14:40:05.777694 |
202 |
61153762 |
PCC Road From Bijay Halder to Rohit Halder at Haripur |
179270 |
PCC Road From Bijay Halder to Rohit Halder at Haripur1 |
Completion of work |
-
latitude : 23.837367058731616,23.837353480048478
Longitude : 88.55419353581965,88.55417090468109
file name : Image_27022022161903464.png
|
2022-02-27 16:19:03.51315 |
203 |
89736866 |
Drainage Construction |
350000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.261580000000002
Longitude : 88.54288833333334
file name : Image_02022024162332527.png
|
2024-02-02 16:23:32.713276 |
204 |
89736866 |
Drainage Construction |
350000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.400961666666664
Longitude : 88.49075833333333
file name : Image_30012024130743133.png
|
2024-01-30 13:07:43.312821 |
205 |
89736866 |
Drainage Construction |
350000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.86226333333333
Longitude : 88.55981333333332
file name : Image_19012024125529580.png
|
2024-01-19 12:55:29.686374 |
206 |
89736866 |
Drainage Construction |
350000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.86231666666667
Longitude : 88.55979166666665
file name : Image_19012024124837779.png
|
2024-01-19 12:48:37.86206 |
207 |
35134497 |
Blacktop road from Balai Mandal to Haran Pramanik |
499200 |
Blacktop road from Balai Mandal to Haran Pramanik 1 |
Plinth level |
-
latitude : 23.7356216,23.7356216
Longitude : 88.5232244,88.5232247
file name : Image_13012024132111638.png
|
2024-01-13 13:21:11.737363 |
208 |
35134497 |
Blacktop road from Balai Mandal to Haran Pramanik |
499200 |
Blacktop road from Balai Mandal to Haran Pramanik 1 |
Completion of work |
-
latitude : 23.8509523,23.8509525
Longitude : 88.5295385,88.5295394
file name : Image_26022022142511204.png
|
2022-02-26 14:25:11.27767 |
209 |
35133686 |
Blactop road from Toyaz Ali to Atikul Sk at Mrigi |
466428 |
Blactop road from Toyaz Ali to Atikul Sk at Mrigi 1 |
Plinth level |
-
latitude : 23.851786666666666,23.851786666666666
Longitude : 88.54561,88.54561
file name : Image_27012024145616251.png
|
2024-01-27 14:56:16.355481 |
210 |
35133686 |
Blactop road from Toyaz Ali to Atikul Sk at Mrigi |
466428 |
Blactop road from Toyaz Ali to Atikul Sk at Mrigi 1 |
Completion of work |
-
latitude : 23.861287,23.861287
Longitude : 88.5122699,88.5122699
file name : Image_19082021114854782.png
|
2021-08-19 11:48:54.851008 |
211 |
60490178 |
installation of drinking water purification plant operated by solar energy under chhitka gp |
1050000 |
installation of drinking water purification plant operated by solar energy under chhitka gp1 |
Completion of work |
-
latitude : 23.837353731505573
Longitude : 88.55537731200457
file name : Image_16032022153055409.png
|
2022-03-16 15:30:55.475072 |
212 |
69559905 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.858236666666667
Longitude : 88.55739999999999
file name : Image_31082024154548689.png
|
2024-08-31 15:45:49.354257 |
213 |
69559905 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.85822333333333
Longitude : 88.55739666666665
file name : Image_31082024154119072.png
|
2024-08-31 15:41:19.680223 |
214 |
68573629 |
Construction of roads |
200000 |
Construction of PCC road from H o Samar Biswas to H o Anup Biswas at Aztullanagar under Chhitka GP |
Roof laid |
-
latitude : 23.85794166666667,23.858063333333334
Longitude : 88.55751166666666,88.55748333333334
file name : Image_09012024144028610.png
|
2024-01-09 14:40:28.694117 |
215 |
68573629 |
Construction of roads |
200000 |
Construction of PCC road from H o Samar Biswas to H o Anup Biswas at Aztullanagar under Chhitka GP |
Plinth level |
-
latitude : 23.734930000000002,23.734930000000002
Longitude : 88.54055000000001,88.54055000000001
file name : Image_08012024124453534.png
|
2024-01-08 12:44:53.716585 |
216 |
68573629 |
Construction of roads |
200000 |
Construction of PCC road from H o Samar Biswas to H o Anup Biswas at Aztullanagar under Chhitka GP |
Completion of work |
-
latitude : 23.8518365,23.8518365
Longitude : 88.5455474,88.5455474
file name : Image_22122023161221926.png
|
2023-12-22 16:12:22.028089 |
217 |
68573629 |
Construction of roads |
200000 |
Construction of PCC road from H o Samar Biswas to H o Anup Biswas at Aztullanagar under Chhitka GP |
Completion of work |
-
latitude : 23.8518365,23.8518365
Longitude : 88.5455474,88.5455474
file name : Image_22122023161128444.png
|
2023-12-22 16:11:28.553203 |
218 |
69575918 |
Construction of roads |
250000 |
Construction of PCC Road from Pucca rasta to H O Dulal Biswas at Mrigi Dhuluripara under Chhitka GP under |
Plinth level |
-
latitude : 23.8431679,23.8431679
Longitude : 88.5403166,88.5403166
file name : Image_11122023133149063.png
|
2023-12-11 13:31:49.162878 |
219 |
69575918 |
Construction of roads |
250000 |
Construction of PCC Road from Pucca rasta to H O Dulal Biswas at Mrigi Dhuluripara under Chhitka GP under |
Plinth level |
-
latitude : 23.843474999999998,23.8431679
Longitude : 88.54065666666665,88.5403166
file name : Image_11122023133145274.png
|
2023-12-11 13:31:45.375812 |
220 |
69575918 |
Construction of roads |
250000 |
Construction of PCC Road from Pucca rasta to H O Dulal Biswas at Mrigi Dhuluripara under Chhitka GP under |
Completion of work |
-
latitude : 23.8431914,23.8431914
Longitude : 88.5403449,88.5403449
file name : Image_05122023141453475.png
|
2023-12-05 14:14:53.58144 |
221 |
69582415 |
Construction of roads |
200000 |
Construction of PCC road from L O Ganesh Samaddar to L O Prollad Mondal at Ilshamari barderpara under chh |
Plinth level |
-
latitude : 23.8469932,23.8469932
Longitude : 88.5668134,88.5668134
file name : Image_11122023134819084.png
|
2023-12-11 13:48:19.380564 |
222 |
69582415 |
Construction of roads |
200000 |
Construction of PCC road from L O Ganesh Samaddar to L O Prollad Mondal at Ilshamari barderpara under chh |
Completion of work |
-
latitude : 23.8468881,23.8469816
Longitude : 88.567398,88.5668134
file name : Image_05122023143208861.png
|
2023-12-05 14:32:08.984021 |
223 |
69577111 |
Repairing and maintenance of roads |
350000 |
Repairing of Blacktop road form near of Mrigi natunpara Prathamik Vidyalay to H O upen sarkar at mrigi na |
Roof laid |
-
latitude : 23.8566978,23.8566978
Longitude : 88.5292321,88.5292321
file name : Image_26122023141439628.png
|
2023-12-26 14:14:39.72933 |
224 |
69577111 |
Repairing and maintenance of roads |
350000 |
Repairing of Blacktop road form near of Mrigi natunpara Prathamik Vidyalay to H O upen sarkar at mrigi na |
Plinth level |
-
latitude : 23.8566775,23.8566978
Longitude : 88.5292392,88.5292321
file name : Image_26122023140331526.png
|
2023-12-26 14:03:31.624399 |
225 |
69577111 |
Repairing and maintenance of roads |
350000 |
Repairing of Blacktop road form near of Mrigi natunpara Prathamik Vidyalay to H O upen sarkar at mrigi na |
Completion of work |
-
latitude : 23.8566775,23.8566775
Longitude : 88.5292392,88.5292392
file name : Image_26122023135958296.png
|
2023-12-26 13:59:58.396882 |
226 |
49429938 |
Construction of Concrete Drain at Nazirpur Deep tuble well |
350000 |
Construction of Concrete Drain at Nazirpur Deep tuble well1 |
Completion of work |
-
latitude : 23.873935,23.873956666666665
Longitude : 88.53377,88.53379166666667
file name : Image_27012023144106434.png
|
2023-01-27 14:41:06.562336 |
227 |
49429938 |
Construction of Concrete Drain at Nazirpur Deep tuble well |
350000 |
Construction of Concrete Drain at Nazirpur Deep tuble well1 |
Completion of work |
-
latitude : 23.87367880437523,23.873632913455367
Longitude : 88.53142770007253,88.5314030572772
file name : Image_30052022060059399.png
|
2022-05-30 06:00:59.502048 |
228 |
49429794 |
Construction of Concrete Drain at Mrigi Duloripara Deep tuble well |
350000 |
Construction of Concrete Drain at Mrigi Duloripara Deep tuble well1 |
Roof laid |
-
latitude : 23.851811,23.851811
Longitude : 88.5455166,88.5455166
file name : Image_27012023132204681.png
|
2023-01-27 13:22:04.791012 |
229 |
49429794 |
Construction of Concrete Drain at Mrigi Duloripara Deep tuble well |
350000 |
Construction of Concrete Drain at Mrigi Duloripara Deep tuble well1 |
Completion of work |
-
latitude : 23.843893333333334,23.84391833333333
Longitude : 88.53135666666667,88.53136333333332
file name : Image_27012023123233307.png
|
2023-01-27 12:32:33.41972 |
230 |
49429794 |
Construction of Concrete Drain at Mrigi Duloripara Deep tuble well |
350000 |
Construction of Concrete Drain at Mrigi Duloripara Deep tuble well1 |
Completion of work |
-
latitude : 23.84418333333333,23.844185
Longitude : 88.53124166666666,88.53121333333333
file name : Image_18012023151718921.png
|
2023-01-18 15:17:19.034838 |
231 |
49429749 |
Construction of Concrete Drain at Mrigi Fakirabadpara Agrictural Drain |
265897 |
Construction of Concrete Drain at Mrigi Fakirabadpara Agrictural Drain1 |
Roof laid |
-
latitude : 23.8518602,23.8518189
Longitude : 88.5455946,88.5455572
file name : Image_18012023155357117.png
|
2023-01-18 15:53:57.962187 |
232 |
49429749 |
Construction of Concrete Drain at Mrigi Fakirabadpara Agrictural Drain |
265897 |
Construction of Concrete Drain at Mrigi Fakirabadpara Agrictural Drain1 |
Completion of work |
-
latitude : 23.859009719453752,23.859081049449742
Longitude : 88.51459021680057,88.514742013067
file name : Image_23052022154746264.png
|
2022-05-23 15:47:46.345769 |
233 |
49418993 |
Construction of Concrete Road at Ilshamari Pacca Rasta to House of Subhas Bapari |
221231 |
Construction of Concrete Road at Ilshamari Pacca Rasta to House of Subhas Bapari1 |
Plinth level |
-
latitude : 23.7356253,23.7356264
Longitude : 88.5232211,88.5232247
file name : Image_13012024163944902.png
|
2024-01-13 16:39:45.107555 |
234 |
49418993 |
Construction of Concrete Road at Ilshamari Pacca Rasta to House of Subhas Bapari |
221231 |
Construction of Concrete Road at Ilshamari Pacca Rasta to House of Subhas Bapari1 |
Completion of work |
-
latitude : 23.85041374247521,23.850403684191406
Longitude : 88.56495405547321,88.56494852341712
file name : Image_12052022090938389.png
|
2022-05-12 09:09:38.457751 |
235 |
59691235 |
Repairing of blacktop road from hat to BSF camp at Ilsamari |
300000 |
Repairing of blacktop road from hat to BSF camp at Ilsamari1 |
Plinth level |
-
latitude : 23.8517899,23.8517899
Longitude : 88.5455285,88.5455285
file name : Image_25072023154934786.png
|
2023-07-25 15:49:34.876053 |
236 |
59691235 |
Repairing of blacktop road from hat to BSF camp at Ilsamari |
300000 |
Repairing of blacktop road from hat to BSF camp at Ilsamari1 |
Plinth level |
-
latitude : 23.845623333333332,23.84565166666666,23.84565166666666
Longitude : 88.56950666666668,88.56947666666669,88.56947666666669
file name : Image_19072023150121150.png
|
2023-07-19 15:01:21.247106 |
237 |
59717070 |
Con of Drain from H/O Gopal Roy to Dilip Mandal at Khanjipur |
400000 |
Construction of Pucca drain from the H/O Gopal Roy to H/O Dilip Mondal at Khanjipur |
Plinth level |
-
latitude : 23.868358333333337,23.86836333333333
Longitude : 88.56967166666666,88.56967000000002
file name : Image_27032023134343046.png
|
2023-03-27 13:43:43.137066 |
238 |
59717070 |
Con of Drain from H/O Gopal Roy to Dilip Mandal at Khanjipur |
400000 |
Construction of Pucca drain from the H/O Gopal Roy to H/O Dilip Mondal at Khanjipur |
Completion of work |
-
latitude : 23.868338333333334,23.868336666666664
Longitude : 88.56965666666669,88.56965
file name : Image_27032023133553781.png
|
2023-03-27 13:35:53.873021 |
239 |
59716808 |
Cons of Pucca drain from H/O Binod Chinta Patra to Banamali Biswas at Khanjipur |
400000 |
Cons of Pucca drain from H/O Binod Chinta Patra to Banamali Biswas at Khanjipur1 |
Roof laid |
-
latitude : 23.8763678,23.8763678
Longitude : 88.5490594,88.5490594
file name : Image_13032023144839926.png
|
2023-03-13 14:48:40.534432 |
240 |
59716808 |
Cons of Pucca drain from H/O Binod Chinta Patra to Banamali Biswas at Khanjipur |
400000 |
Cons of Pucca drain from H/O Binod Chinta Patra to Banamali Biswas at Khanjipur1 |
Plinth level |
-
latitude : 23.8763678,23.8763678
Longitude : 88.5490594,88.5490594
file name : Image_13032023144431085.png
|
2023-03-13 14:44:31.188862 |
241 |
59716808 |
Cons of Pucca drain from H/O Binod Chinta Patra to Banamali Biswas at Khanjipur |
400000 |
Cons of Pucca drain from H/O Binod Chinta Patra to Banamali Biswas at Khanjipur1 |
Completion of work |
-
latitude : 23.8763678,23.8763678
Longitude : 88.5490594,88.5490594
file name : Image_13032023143544212.png
|
2023-03-13 14:35:44.318678 |
242 |
59670850 |
Con of PCC road from Pucca Rasta to Kalu at Chhitka |
143482 |
Construction of PCC road from pucca rasta to L/O Kalu at Chhitka Under Chhitka GP |
Roof laid |
-
latitude : 23.848926666666664,23.848916666666664
Longitude : 88.54646666666667,88.54645666666666
file name : Image_10032023124355874.png
|
2023-03-10 12:43:55.97554 |
243 |
59670850 |
Con of PCC road from Pucca Rasta to Kalu at Chhitka |
143482 |
Construction of PCC road from pucca rasta to L/O Kalu at Chhitka Under Chhitka GP |
Completion of work |
-
latitude : 23.849001666666663,23.849024999999997
Longitude : 88.54692500000002,88.54697333333334
file name : Image_09032023132640409.png
|
2023-03-09 13:26:40.506856 |
244 |
59693796 |
Cons of blacktop road from H/O Ranjan Biswas to Mantu Roy at Mobarakpur |
300000 |
Cons of blacktop road from H/O Ranjan Biswas to Mantu Roy at Mobarakpur1 |
Roof laid |
-
latitude : 23.8405775,23.8405775
Longitude : 88.5664548,88.5664548
file name : Image_30032023133836033.png
|
2023-03-30 13:38:36.131573 |
245 |
59693796 |
Cons of blacktop road from H/O Ranjan Biswas to Mantu Roy at Mobarakpur |
300000 |
Cons of blacktop road from H/O Ranjan Biswas to Mantu Roy at Mobarakpur1 |
Completion of work |
-
latitude : 23.8405775,23.8405775
Longitude : 88.5664548,88.5664548
file name : Image_30032023133034168.png
|
2023-03-30 13:30:34.278273 |
246 |
59695158 |
Cons of PCC road from Mobarakpur Main road to H/O Bipul Biswas at Mobarakpur |
249719 |
Cons of PCC road from Mobarakpur Main road to H/O Bipul Biswas at Mobarakpur1 |
Roof laid |
-
latitude : 23.8397422,23.8397422
Longitude : 88.5640673,88.5640673
file name : Image_10032023123443113.png
|
2023-03-10 12:34:43.231886 |
247 |
59695158 |
Cons of PCC road from Mobarakpur Main road to H/O Bipul Biswas at Mobarakpur |
249719 |
Cons of PCC road from Mobarakpur Main road to H/O Bipul Biswas at Mobarakpur1 |
Plinth level |
-
latitude : 23.8397422,23.8397422
Longitude : 88.5640673,88.5640673
file name : Image_09032023133944158.png
|
2023-03-09 13:39:44.262545 |
248 |
59695158 |
Cons of PCC road from Mobarakpur Main road to H/O Bipul Biswas at Mobarakpur |
249719 |
Cons of PCC road from Mobarakpur Main road to H/O Bipul Biswas at Mobarakpur1 |
Completion of work |
-
latitude : 23.839976666666665,23.839973333333333
Longitude : 88.56357000000001,88.56356666666667
file name : Image_06032023140426138.png
|
2023-03-06 14:04:26.232621 |
249 |
59723925 |
Cons of drain of 169 no DTW 2 no spout at Mobarakpur |
299926 |
Cons of drain of 169 no DTW 2 no spout at Mobarakpur1 |
Completion of work |
-
latitude : 23.8717981,23.8717981
Longitude : 88.5362278,88.5362278
file name : Image_28032023131101760.png
|
2023-03-28 13:11:01.939863 |
250 |
59723925 |
Cons of drain of 169 no DTW 2 no spout at Mobarakpur |
299926 |
Cons of drain of 169 no DTW 2 no spout at Mobarakpur1 |
Completion of work |
-
latitude : 23.836744999999997,23.83681
Longitude : 88.55829999999999,88.558295
file name : Image_27032023143917296.png
|
2023-03-27 14:39:17.395732 |
251 |
68619804 |
Drainage Construction |
300000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.8455823
Longitude : 88.5425922
file name : Image_08022024125801524.png
|
2024-02-08 12:58:01.637901 |
252 |
68619804 |
Drainage Construction |
300000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.8455823
Longitude : 88.5425922
file name : Image_08022024124557719.png
|
2024-02-08 12:45:57.818559 |
253 |
68619804 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.8518365
Longitude : 88.5455474
file name : Image_22122023163630408.png
|
2023-12-22 16:36:30.487446 |
254 |
68619804 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.8518365
Longitude : 88.5455474
file name : Image_22122023163202066.png
|
2023-12-22 16:32:02.181198 |
255 |
59669271 |
Con of PCC road from Pucca Rasta to H/O Mani Sarkar at Dangapara |
300000 |
Con of PCC road from Pucca Rasta to H/O Mani Sarkar at Dangapara1 |
Roof laid |
-
latitude : 23.85176333333333,23.86239666666667,23.862386666666666,23.86237833333333
Longitude : 88.54556499999998,88.535745,88.535745,88.53575500000001
file name : Image_08062023144535069.png
|
2023-06-08 14:45:35.293149 |
256 |
59724701 |
Con of pucca drain from 3 no spout to Nilkanta Sarkar 458 no DTW at Ilsamari |
249531 |
Con of pucca drain from 3 no spout to Nilkanta Sarkar 458 no DTW at Ilsamari1 |
Roof laid |
-
latitude : 23.8518018,23.8518018
Longitude : 88.5455663,88.5455663
file name : Image_25042023151130017.png
|
2023-04-25 15:11:30.123632 |
257 |
59724701 |
Con of pucca drain from 3 no spout to Nilkanta Sarkar 458 no DTW at Ilsamari |
249531 |
Con of pucca drain from 3 no spout to Nilkanta Sarkar 458 no DTW at Ilsamari1 |
Roof laid |
-
latitude : 23.852398333333333,23.852408333333333
Longitude : 88.55733666666666,88.55733833333333
file name : Image_18042023142921706.png
|
2023-04-18 14:29:21.815447 |
258 |
59724701 |
Con of pucca drain from 3 no spout to Nilkanta Sarkar 458 no DTW at Ilsamari |
249531 |
Con of pucca drain from 3 no spout to Nilkanta Sarkar 458 no DTW at Ilsamari1 |
Completion of work |
-
latitude : 23.8518597,23.8518597
Longitude : 88.5455995,88.5455995
file name : Image_13042023140452547.png
|
2023-04-13 14:04:52.662464 |
259 |
59724701 |
Con of pucca drain from 3 no spout to Nilkanta Sarkar 458 no DTW at Ilsamari |
249531 |
Con of pucca drain from 3 no spout to Nilkanta Sarkar 458 no DTW at Ilsamari1 |
Completion of work |
-
latitude : 23.852368333333335,23.852358333333335
Longitude : 88.55730999999999,88.55730833333334
file name : Image_10042023130535626.png
|
2023-04-10 13:05:35.767877 |
260 |
67201473 |
Construction Of PCC road from h/o parimal sarkar to h/o santiranjan roy at Haripur |
350000 |
Construction Of PCC road from h/o parimal sarkar to h/o santiranjan roy at Haripur1 |
Roof laid |
-
latitude : 23.829676666666668,23.829721666666668
Longitude : 88.54227833333334,88.54229333333333
file name : Image_13032023151942432.png
|
2023-03-13 15:19:42.51751 |
261 |
67308972 |
PCC Road from h/o Ansar Mondal to h/o Asit Pal via Bidhubushan at Nazirpur |
350000 |
PCC Road from h/o Ansar Mondal to h/o Asit Pal via Bidhubushan at Nazirpur1 |
Roof laid |
-
latitude : 23.8618409,23.8618409,23.8618409,23.8618409,23.8618409
Longitude : 88.538447,88.538447,88.538447,88.538447,88.538447
file name : Image_06042023124324758.png
|
2023-04-06 12:43:24.862305 |
262 |
67308972 |
PCC Road from h/o Ansar Mondal to h/o Asit Pal via Bidhubushan at Nazirpur |
350000 |
PCC Road from h/o Ansar Mondal to h/o Asit Pal via Bidhubushan at Nazirpur1 |
Plinth level |
-
latitude : 23.86587833333333,23.86592166666667
Longitude : 88.535025,88.53504666666667
file name : Image_04042023120903016.png
|
2023-04-04 12:09:03.115883 |
263 |
67308972 |
PCC Road from h/o Ansar Mondal to h/o Asit Pal via Bidhubushan at Nazirpur |
350000 |
PCC Road from h/o Ansar Mondal to h/o Asit Pal via Bidhubushan at Nazirpur1 |
Completion of work |
-
latitude : 23.865928,23.865928
Longitude : 88.5358029,88.5358029
file name : Image_04042023120311826.png
|
2023-04-04 12:03:11.936134 |
264 |
67309018 |
Construction of WBM Road from the h/o Ramlal Mondal to Maynamari Khal at Dangapara |
300000 |
Construction of WBM Road from the h/o Ramlal Mondal to Maynamari Khal at Dangapara1 |
Roof laid |
-
latitude : 23.863421666666667,23.86342666666667
Longitude : 88.54294833333333,88.54295500000002
file name : Image_13042023151335142.png
|
2023-04-13 15:13:35.243304 |
265 |
67309018 |
Construction of WBM Road from the h/o Ramlal Mondal to Maynamari Khal at Dangapara |
300000 |
Construction of WBM Road from the h/o Ramlal Mondal to Maynamari Khal at Dangapara1 |
Completion of work |
-
latitude : 23.8680994,23.863411666666668
Longitude : 88.5369455,88.54301500000001
file name : Image_12042023160825391.png
|
2023-04-12 16:08:25.478501 |
266 |
67309018 |
Construction of WBM Road from the h/o Ramlal Mondal to Maynamari Khal at Dangapara |
300000 |
Construction of WBM Road from the h/o Ramlal Mondal to Maynamari Khal at Dangapara1 |
Completion of work |
-
latitude : 23.8518167,23.8518167
Longitude : 88.5455515,88.5455515
file name : Image_12042023154316783.png
|
2023-04-12 15:43:16.883871 |
267 |
68617918 |
Drainage Construction |
349850 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.85024166666667
Longitude : 88.56184499999999
file name : Image_27122023164417662.png
|
2023-12-27 16:44:17.752607 |
268 |
68617918 |
Drainage Construction |
349850 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.85024166666667
Longitude : 88.56180333333332
file name : Image_27122023164009324.png
|
2023-12-27 16:40:09.418097 |
269 |
68617918 |
Drainage Construction |
349850 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.8518396
Longitude : 88.5455639
file name : Image_27122023133331728.png
|
2023-12-27 13:33:31.838843 |
270 |
76496496 |
Construction of toilets in public institutions |
350000 |
Construction of Community toilet at Ilsamari ICDS no 271 Centre Under Chhitka GP |
Roof laid |
-
latitude : 23.85091
Longitude : 88.58863666666666
file name : Image_11122023135750098.png
|
2023-12-11 13:57:50.820345 |
271 |
76496496 |
Construction of toilets in public institutions |
350000 |
Construction of Community toilet at Ilsamari ICDS no 271 Centre Under Chhitka GP |
Plinth level |
-
latitude : 23.85086666666667
Longitude : 88.58859833333332
file name : Image_05122023144103152.png
|
2023-12-05 14:41:03.783899 |
272 |
76496496 |
Construction of toilets in public institutions |
350000 |
Construction of Community toilet at Ilsamari ICDS no 271 Centre Under Chhitka GP |
Plinth level |
-
latitude : 23.857209
Longitude : 88.5598392
file name : Image_05122023140312618.png
|
2023-12-05 14:03:12.75316 |
273 |
76496496 |
Construction of toilets in public institutions |
350000 |
Construction of Community toilet at Ilsamari ICDS no 271 Centre Under Chhitka GP |
Completion of work |
-
latitude : 23.8518449
Longitude : 88.5455065
file name : Image_04122023143902663.png
|
2023-12-04 14:39:02.771666 |
274 |
67311559 |
Creation of a new source of drinking water |
69959 |
Installation of water purifier at Nazirpur high school Under Chhitka GP (Blue Star ) |
Roof laid |
-
latitude : 23.87138333333333
Longitude : 88.53718500000001
file name : Image_04052023133527275.png
|
2023-05-04 13:35:27.384727 |
275 |
76510769 |
Creation of a new source of drinking water |
80000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.8517912
Longitude : 88.5455511
file name : Image_13072024153830036.png
|
2024-07-13 15:38:30.087879 |
276 |
76510769 |
Creation of a new source of drinking water |
80000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.8517882
Longitude : 88.5455499
file name : Image_13072024153437891.png
|
2024-07-13 15:34:37.949555 |
277 |
76510769 |
Creation of a new source of drinking water |
80000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.8517742
Longitude : 88.5455886
file name : Image_15122023132817267.png
|
2023-12-15 13:28:17.183698 |
278 |
76510769 |
Creation of a new source of drinking water |
80000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.8518363
Longitude : 88.5455285
file name : Image_08122023130539034.png
|
2023-12-08 13:05:39.133733 |
279 |
76510769 |
Creation of a new source of drinking water |
80000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.8518363
Longitude : 88.5455285
file name : Image_07122023162012670.png
|
2023-12-07 16:20:12.918211 |
280 |
64459511 |
Black top mRoad from Das para Pitch Road to towards shantilata MSK Shool at Mirgi |
350000 |
Black top mRoad from Das para Pitch Road to towards shantilata MSK Shool at Mirgi1 |
Roof laid |
-
latitude : 23.8518602,23.8518602
Longitude : 88.5455946,88.5455946
file name : Image_18012023152350457.png
|
2023-01-18 15:23:50.559894 |
281 |
64480248 |
Pucca Drain at 3 no spout to l/o abhilash mondal at mobarakpur |
350000 |
Pucca Drain at 3 no spout to l/o abhilash mondal at mobarakpur1 |
Roof laid |
-
latitude : 23.837753333333332
Longitude : 88.564845
file name : Image_19012023144442172.png
|
2023-01-19 14:44:42.273221 |
282 |
64480248 |
Pucca Drain at 3 no spout to l/o abhilash mondal at mobarakpur |
350000 |
Pucca Drain at 3 no spout to l/o abhilash mondal at mobarakpur1 |
Completion of work |
-
latitude : 23.837688333333336
Longitude : 88.56489333333333
file name : Image_19012023141325256.png
|
2023-01-19 14:13:25.359512 |
283 |
64480248 |
Pucca Drain at 3 no spout to l/o abhilash mondal at mobarakpur |
350000 |
Pucca Drain at 3 no spout to l/o abhilash mondal at mobarakpur1 |
Completion of work |
-
latitude : 23.837825
Longitude : 88.56488666666668
file name : Image_16012023153125877.png
|
2023-01-16 15:31:25.978288 |
284 |
64480209 |
Pucca Drain at 5 No Spout to Land Mirtunjay Sarkar to Dhuluripara |
350000 |
Pucca Drain at 5 No Spout to Land Mirtunjay Sarkar to Dhuluripara1 |
Roof laid |
-
latitude : 23.8518408
Longitude : 88.5455712
file name : Image_18012023152054245.png
|
2023-01-18 15:20:54.347243 |
285 |
64480209 |
Pucca Drain at 5 No Spout to Land Mirtunjay Sarkar to Dhuluripara |
350000 |
Pucca Drain at 5 No Spout to Land Mirtunjay Sarkar to Dhuluripara1 |
Roof laid |
-
latitude : 23.8518182
Longitude : 88.5455565
file name : Image_18012023152141108.png
|
2023-01-18 15:21:41.271544 |
286 |
64480209 |
Pucca Drain at 5 No Spout to Land Mirtunjay Sarkar to Dhuluripara |
350000 |
Pucca Drain at 5 No Spout to Land Mirtunjay Sarkar to Dhuluripara1 |
Completion of work |
-
latitude : 23.842953333333337
Longitude : 88.53262500000001
file name : Image_03012023125045888.png
|
2023-01-03 12:50:45.993769 |
287 |
64480390 |
Pucca Drain at DTW 497 Chambar no 2 at Dangapara |
350000 |
Pucca Drain at DTW 497 Chambar no 2 at Dangapara1 |
Roof laid |
-
latitude : 23.8517899,23.8517899
Longitude : 88.5455285,88.5455285
file name : Image_06012023132716148.png
|
2023-01-06 13:27:16.300894 |
288 |
64480343 |
pucca drain at 134 no deep Tubewell 4 no spout at Nazirpur |
350000 |
pucca drain at 134 no deep Tubewell 4 no spout at Nazirpur1 |
Roof laid |
-
latitude : 23.8734452
Longitude : 88.5359823
file name : Image_06022023132459186.png
|
2023-02-06 13:24:59.28267 |
289 |
64480343 |
pucca drain at 134 no deep Tubewell 4 no spout at Nazirpur |
350000 |
pucca drain at 134 no deep Tubewell 4 no spout at Nazirpur1 |
Plinth level |
-
latitude : 23.8734452
Longitude : 88.5359823
file name : Image_06022023131804035.png
|
2023-02-06 13:18:04.129786 |
290 |
64480343 |
pucca drain at 134 no deep Tubewell 4 no spout at Nazirpur |
350000 |
pucca drain at 134 no deep Tubewell 4 no spout at Nazirpur1 |
Completion of work |
-
latitude : 23.8734452
Longitude : 88.5359823
file name : Image_06022023131011696.png
|
2023-02-06 13:10:11.795229 |
291 |
64480333 |
pucca Drain of 169 no DTW at 1 no spout at Mobarakpur |
350000 |
pucca Drain of 169 no DTW at 1 no spout at Mobarakpur1 |
Roof laid |
-
latitude : 23.836943333333338
Longitude : 88.56277666666668
file name : Image_19012023145040651.png
|
2023-01-19 14:50:40.759242 |
292 |
64480333 |
pucca Drain of 169 no DTW at 1 no spout at Mobarakpur |
350000 |
pucca Drain of 169 no DTW at 1 no spout at Mobarakpur1 |
Plinth level |
-
latitude : 23.83696166666667
Longitude : 88.56282666666667
file name : Image_19012023140532888.png
|
2023-01-19 14:05:32.98077 |
293 |
64480333 |
pucca Drain of 169 no DTW at 1 no spout at Mobarakpur |
350000 |
pucca Drain of 169 no DTW at 1 no spout at Mobarakpur1 |
Plinth level |
-
latitude : 23.837008333333333
Longitude : 88.56279833333335
file name : Image_16012023153812701.png
|
2023-01-16 15:38:12.807673 |
294 |
64480333 |
pucca Drain of 169 no DTW at 1 no spout at Mobarakpur |
350000 |
pucca Drain of 169 no DTW at 1 no spout at Mobarakpur1 |
Completion of work |
-
latitude : 23.409263333333335
Longitude : 88.49836333333333
file name : Image_05012023123222807.png
|
2023-01-05 12:32:22.907735 |
295 |
64480366 |
Pucca Drain at DTW 497 Of Chambar no 3 |
350000 |
Pucca Drain at DTW 497 Of Chambar no 31 |
Roof laid |
-
latitude : 23.860246666666665
Longitude : 88.53779833333334
file name : Image_03022023143514031.png
|
2023-02-03 14:35:14.150906 |
296 |
64480366 |
Pucca Drain at DTW 497 Of Chambar no 3 |
350000 |
Pucca Drain at DTW 497 Of Chambar no 31 |
Completion of work |
-
latitude : 23.200120000000002
Longitude : 88.53414166666668
file name : Image_03022023143039742.png
|
2023-02-03 14:30:39.871524 |
297 |
64480227 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur |
350000 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur1 |
Roof laid |
-
latitude : 23.8411614
Longitude : 88.5756074
file name : Image_02022023150134891.png
|
2023-02-02 15:01:34.98984 |
298 |
64480227 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur |
350000 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur1 |
Roof laid |
-
latitude : 23.841213333333332
Longitude : 88.57561666666668
file name : Image_02022023150146016.png
|
2023-02-02 15:01:46.099112 |
299 |
64480227 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur |
350000 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur1 |
Roof laid |
-
latitude : 23.8411614
Longitude : 88.5756074
file name : Image_02022023150155575.png
|
2023-02-02 15:01:55.654511 |
300 |
64480227 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur |
350000 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur1 |
Roof laid |
-
latitude : 23.8411614
Longitude : 88.5756074
file name : Image_02022023150213350.png
|
2023-02-02 15:02:13.431937 |
301 |
64480227 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur |
350000 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur1 |
Roof laid |
-
latitude : 23.841185000000003
Longitude : 88.57567333333333
file name : Image_02022023150227505.png
|
2023-02-02 15:02:27.584471 |
302 |
64480227 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur |
350000 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur1 |
Roof laid |
-
latitude : 23.8411614
Longitude : 88.5756074
file name : Image_02022023150231899.png
|
2023-02-02 15:02:31.982076 |
303 |
64480227 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur |
350000 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur1 |
Roof laid |
-
latitude : 23.841213333333332
Longitude : 88.57561666666668
file name : Image_02022023150236933.png
|
2023-02-02 15:02:37.014173 |
304 |
64480227 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur |
350000 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur1 |
Roof laid |
-
latitude : 23.8411614
Longitude : 88.5756074
file name : Image_02022023150412782.png
|
2023-02-02 15:04:12.866843 |
305 |
64480227 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur |
350000 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur1 |
Roof laid |
-
latitude : 23.8411618
Longitude : 88.5756451
file name : Image_19012023152815426.png
|
2023-01-19 15:28:15.552476 |
306 |
64480227 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur |
350000 |
Pucca Drain near h/o haran mridha to h/o swapan biswas at mobarakpur1 |
Completion of work |
-
latitude : 23.8411618
Longitude : 88.5756451
file name : Image_16012023155032032.png
|
2023-01-16 15:50:32.148104 |
307 |
49419127 |
Blacktop Road at Mobarakpur House of Ramprosad Das to Durga Mandir |
300000 |
Blacktop Road at Mobarakpur House of Ramprosad Das to Durga Mandir1 |
Roof laid |
-
latitude : 23.8518224,23.8518224
Longitude : 88.5455496,88.5455496
file name : Image_06012023132741316.png
|
2023-01-06 13:27:41.431227 |
308 |
49419662 |
Concrete Road at Mobarakpur House of Bijoy Mondal to Kalla Dhali |
350000 |
Concrete Road at Mobarakpur House of Bijoy Mondal to Kalla Dhali1 |
Roof laid |
-
latitude : 23.8517899,23.8517899
Longitude : 88.5455285,88.5455285
file name : Image_06012023132803869.png
|
2023-01-06 13:28:03.987256 |
309 |
49419662 |
Concrete Road at Mobarakpur House of Bijoy Mondal to Kalla Dhali |
350000 |
Concrete Road at Mobarakpur House of Bijoy Mondal to Kalla Dhali1 |
Completion of work |
-
latitude : 23.837958333333336,23.837946666666667
Longitude : 88.57744833333332,88.57743833333333
file name : Image_29122022151023843.png
|
2022-12-29 15:10:23.943024 |
310 |
64480423 |
Pucca Drain of 134 no DTW at 1 no spout near l/o subrata Biswas to l/o Sankar Mondal |
350000 |
Pucca Drain of 134 no DTW at 1 no spout near l/o subrata Biswas to l/o Sankar Mondal1 |
Roof laid |
-
latitude : 23.8694106,23.8694106
Longitude : 88.5365149,88.5365149
file name : Image_08022023135634934.png
|
2023-02-08 13:56:35.057504 |
311 |
64480423 |
Pucca Drain of 134 no DTW at 1 no spout near l/o subrata Biswas to l/o Sankar Mondal |
350000 |
Pucca Drain of 134 no DTW at 1 no spout near l/o subrata Biswas to l/o Sankar Mondal1 |
Completion of work |
-
latitude : 23.8673561,23.8673561
Longitude : 88.5368668,88.5368668
file name : Image_08022023125838216.png
|
2023-02-08 12:58:38.408769 |
312 |
65640358 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.841195000000003,23.84117
Longitude : 88.54513333333334,88.54516833333334
file name : Image_08022023133332996.png
|
2023-02-08 13:33:33.109336 |
313 |
65640358 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.841136666666664,23.841128333333337
Longitude : 88.54512333333332,88.5451
file name : Image_08022023132828601.png
|
2023-02-08 13:28:28.712536 |
314 |
35132504 |
Blacktop road from Samir Samaddar to Nitai Mistry at Mobarakpur |
173590 |
Blacktop road from Samir Samaddar to Nitai Mistry at Mobarakpur 1 |
Plinth level |
-
latitude : 23.7356968,23.7356867
Longitude : 88.5232086,88.5232209
file name : Image_09122023121951465.png
|
2023-12-09 12:19:51.709561 |
315 |
35132504 |
Blacktop road from Samir Samaddar to Nitai Mistry at Mobarakpur |
173590 |
Blacktop road from Samir Samaddar to Nitai Mistry at Mobarakpur 1 |
Completion of work |
-
latitude : 23.8383313966915,23.838312914595008
Longitude : 88.5566134750843,88.55662026442587
file name : Image_24022022164654021.png
|
2022-02-24 16:46:54.097259 |
316 |
35134445 |
PCC road from Sujit Howlader to ICDS |
377650 |
PCC road from Sujit Howlader to ICDS1 |
Plinth level |
-
latitude : 23.7356213,23.7356216,23.7356216
Longitude : 88.5232245,88.5232246,88.5232246
file name : Image_13012024131950769.png
|
2024-01-13 13:19:50.947238 |
317 |
35134445 |
PCC road from Sujit Howlader to ICDS |
377650 |
PCC road from Sujit Howlader to ICDS1 |
Completion of work |
-
latitude : 23.875216506421566,23.875224175862968
Longitude : 88.54207456111908,88.54206684976816
file name : Image_22082021164837464.png
|
2021-08-22 16:48:37.532517 |
318 |
39068637 |
Construction of Drain near Shib Mandir to Kalitala at Bagadoba |
413410 |
Construction of Drain near Shib Mandir to Kalitala at Bagadoba1 |
Plinth level |
-
latitude : 23.7356264,23.7356216
Longitude : 88.5232247,88.5232247
file name : Image_13012024172859897.png
|
2024-01-13 17:29:00.005314 |
319 |
39068637 |
Construction of Drain near Shib Mandir to Kalitala at Bagadoba |
413410 |
Construction of Drain near Shib Mandir to Kalitala at Bagadoba1 |
Completion of work |
-
latitude : 23.869325118139386,23.869325118139386
Longitude : 88.54135044850409,88.54135044850409
file name : Image_24082021111204748.png
|
2021-08-24 11:12:04.81178 |
320 |
39070299 |
Construction of Community toilet near Chhitka Daspara Bazar |
349905 |
Construction of Community toilet near Chhitka Daspara Bazar1 |
Plinth level |
-
latitude : 23.8554125
Longitude : 88.5441123
file name : Image_13122023142954066.png
|
2023-12-13 14:29:54.163991 |
321 |
39070299 |
Construction of Community toilet near Chhitka Daspara Bazar |
349905 |
Construction of Community toilet near Chhitka Daspara Bazar1 |
Completion of work |
-
latitude : 23.855138333333336
Longitude : 88.54440500000001
file name : Image_08122023150055944.png
|
2023-12-08 15:00:56.047327 |
322 |
39070299 |
Construction of Community toilet near Chhitka Daspara Bazar |
349905 |
Construction of Community toilet near Chhitka Daspara Bazar1 |
Completion of work |
-
latitude : 23.8552693
Longitude : 88.5450461
file name : Image_12042022114625612.png
|
2022-04-12 11:46:25.695069 |
323 |
39070773 |
Community tiolet near Harimandir at Khanjipur |
349905 |
Community tiolet near Harimandir at Khanjipur 1 |
Plinth level |
-
latitude : 23.8518628
Longitude : 88.5455639
file name : Image_14012024142114013.png
|
2024-01-14 14:21:14.151328 |
324 |
39070773 |
Community tiolet near Harimandir at Khanjipur |
349905 |
Community tiolet near Harimandir at Khanjipur 1 |
Completion of work |
-
latitude : 23.871273072436452
Longitude : 88.57394482009113
file name : Image_30052022163843463.png
|
2022-05-30 16:38:43.530239 |
325 |
39068473 |
Community toilet near Sitala Mandir at Astullanagar |
402973 |
Community toilet near Sitala Mandir at Astullanagar1 |
Plinth level |
-
latitude : 23.862526666666668
Longitude : 88.56014666666667
file name : Image_13122023144308360.png
|
2023-12-13 14:43:08.46399 |
326 |
39068473 |
Community toilet near Sitala Mandir at Astullanagar |
402973 |
Community toilet near Sitala Mandir at Astullanagar1 |
Completion of work |
-
latitude : 23.86264310684055
Longitude : 88.56019573286176
file name : Image_11032022174626602.png
|
2022-03-11 17:46:26.68398 |
327 |
35257845 |
Blacktop road from Pucca rasta to Amrita Tikader |
497265 |
Blacktop road from Pucca rasta to Amrita Tikader 1 |
Plinth level |
-
latitude : 23.8518628,23.8518628
Longitude : 88.5455639,88.5455639
file name : Image_15012024171309802.png
|
2024-01-15 17:13:09.922181 |
328 |
35257845 |
Blacktop road from Pucca rasta to Amrita Tikader |
497265 |
Blacktop road from Pucca rasta to Amrita Tikader 1 |
Completion of work |
-
latitude : 23.868862730450928,23.838908784091473
Longitude : 88.53803096339107,88.55775089934468
file name : Image_18112021140511461.png
|
2021-11-18 14:05:11.537037 |
329 |
35257845 |
Blacktop road from Pucca rasta to Amrita Tikader |
497265 |
Blacktop road from Pucca rasta to Amrita Tikader 1 |
Completion of work |
-
latitude : 23.8400090765208,23.8400090765208
Longitude : 88.55730229988694,88.55730229988694
file name : Image_24082021134533778.png
|
2021-08-24 13:45:33.847199 |
330 |
35134068 |
Blacktop road from Kartick Ghosh to Ajit Mandal |
283590 |
Blacktop road from Kartick Ghosh to Ajit Mandal 1 |
Plinth level |
-
latitude : 23.7356883,23.7356883
Longitude : 88.5232185,88.5232185
file name : Image_09122023160713281.png
|
2023-12-09 16:07:13.40335 |
331 |
35134068 |
Blacktop road from Kartick Ghosh to Ajit Mandal |
283590 |
Blacktop road from Kartick Ghosh to Ajit Mandal 1 |
Completion of work |
-
latitude : 23.85011358652264,23.85011358652264
Longitude : 88.54636760428548,88.54636760428548
file name : Image_18082021121757848.png
|
2021-08-18 12:17:57.935463 |
332 |
35244560 |
Construction of PCC road from Pucca rasta to Makhani at Chhitka |
141170 |
Construction of PCC road from Pucca rasta to Makhani at Chhitka 1 |
Plinth level |
-
latitude : 23.7356879,23.7356872
Longitude : 88.5232184,88.5232189
file name : Image_09122023160917370.png
|
2023-12-09 16:09:17.485376 |
333 |
35244560 |
Construction of PCC road from Pucca rasta to Makhani at Chhitka |
141170 |
Construction of PCC road from Pucca rasta to Makhani at Chhitka 1 |
Completion of work |
-
latitude : 23.85428328998387,23.854323271661997
Longitude : 88.53440545499325,88.53440050967038
file name : Image_22082021170037439.png
|
2021-08-22 17:00:37.497803 |
334 |
35280980 |
Boundary wall of Astullanagar primary School |
344158 |
Boundary wall of Astullanagar primary School1 |
Plinth level |
-
latitude : 23.8556667
Longitude : 88.5489178
file name : Image_13122023143700934.png
|
2023-12-13 14:37:01.039819 |
335 |
35280980 |
Boundary wall of Astullanagar primary School |
344158 |
Boundary wall of Astullanagar primary School1 |
Completion of work |
-
latitude : 23.85795389302075
Longitude : 88.55620125308633
file name : Image_27022022175350324.png
|
2022-02-27 17:53:50.398207 |
336 |
35132433 |
Black top road from Kamal Biswas to Bhangarasta at Ilsamari |
499375 |
Black top road from Kamal Biswas to Bhangarasta at Ilsamari1 |
Roof laid |
-
latitude : 23.851828,23.851828
Longitude : 88.5455734,88.5455734
file name : Image_27012024145144945.png
|
2024-01-27 14:51:44.793332 |
337 |
35132433 |
Black top road from Kamal Biswas to Bhangarasta at Ilsamari |
499375 |
Black top road from Kamal Biswas to Bhangarasta at Ilsamari1 |
Plinth level |
-
latitude : 23.7356218,23.7356214
Longitude : 88.5232241,88.5232242
file name : Image_13012024131727252.png
|
2024-01-13 13:17:27.363536 |
338 |
35132433 |
Black top road from Kamal Biswas to Bhangarasta at Ilsamari |
499375 |
Black top road from Kamal Biswas to Bhangarasta at Ilsamari1 |
Completion of work |
-
latitude : 23.84700490627438,23.84700490627438
Longitude : 88.57711150310934,88.57711150310934
file name : Image_27022022175347462.png
|
2022-02-27 17:53:47.547609 |
339 |
35192069 |
PCC road from Ruidas to Amar Biswas at Chhitka |
142780 |
PCC road from Ruidas to Amar Biswas at Chhitka 1 |
Plinth level |
-
latitude : 23.851828,23.851828
Longitude : 88.5455734,88.5455734
file name : Image_27012024150417348.png
|
2024-01-27 15:04:17.501107 |
340 |
35192069 |
PCC road from Ruidas to Amar Biswas at Chhitka |
142780 |
PCC road from Ruidas to Amar Biswas at Chhitka 1 |
Completion of work |
-
latitude : 23.85513547807932,23.85513547807932
Longitude : 88.5472403280437,88.5472403280437
file name : Image_27022022161900600.png
|
2022-02-27 16:19:00.64989 |
341 |
60486913 |
construction pacca drain from LO bimal biswas to LO faring saha to Lo jaganath mondal of west side |
349950 |
construction pacca drain from LO bimal biswas to LO faring saha to Lo jaganath mondal of west side1 |
Plinth level |
-
latitude : 23.7356256,23.7356216
Longitude : 88.5232206,88.5232245
file name : Image_13012024130138506.png
|
2024-01-13 13:01:38.609089 |
342 |
60486913 |
construction pacca drain from LO bimal biswas to LO faring saha to Lo jaganath mondal of west side |
349950 |
construction pacca drain from LO bimal biswas to LO faring saha to Lo jaganath mondal of west side1 |
Completion of work |
-
latitude : 23.845635973848403,23.845623987726867,23.84560433216393,23.84560433216393
Longitude : 88.5443284548819,88.54434505105019,88.54440934024751,88.54440934024751
file name : Image_08032022082331600.png
|
2022-03-08 08:23:31.685646 |
343 |
39070534 |
Community tiolet near Ilsamari Hat at Ilsamari |
349905 |
Community tiolet near Ilsamari Hat at Ilsamari 1 |
Plinth level |
-
latitude : 23.7356884
Longitude : 88.5232188
file name : Image_09122023160600123.png
|
2023-12-09 16:06:00.255833 |
344 |
39070534 |
Community tiolet near Ilsamari Hat at Ilsamari |
349905 |
Community tiolet near Ilsamari Hat at Ilsamari 1 |
Completion of work |
-
latitude : 23.850221
Longitude : 88.5652981
file name : Image_06042022090109515.png
|
2022-04-06 09:01:09.599605 |
345 |
39071319 |
Construction of community toilet near DTW at Mrigi Natunpara |
349905 |
Construction of community toilet near DTW at Mrigi Natunpara1 |
Plinth level |
-
latitude : 23.7356879
Longitude : 88.5232186
file name : Image_09122023161020408.png
|
2023-12-09 16:10:20.526201 |
346 |
39071319 |
Construction of community toilet near DTW at Mrigi Natunpara |
349905 |
Construction of community toilet near DTW at Mrigi Natunpara1 |
Completion of work |
-
latitude : 23.857059963047504
Longitude : 88.52819345891476
file name : Image_06042022090059681.png
|
2022-04-06 09:00:59.759101 |
347 |
61158157 |
PCC Road from Debabrata roy to Bijiten Biswas at Khanjipur |
334286 |
PCC Road from Debabrata roy to Bijiten Biswas at Khanjipur1 |
Plinth level |
-
latitude : 23.7356217,23.7356216
Longitude : 88.523224,88.5232239
file name : Image_13012024135039030.png
|
2024-01-13 13:50:39.125246 |
348 |
61158157 |
PCC Road from Debabrata roy to Bijiten Biswas at Khanjipur |
334286 |
PCC Road from Debabrata roy to Bijiten Biswas at Khanjipur1 |
Completion of work |
-
latitude : 23.865571743808687,23.866280601359904
Longitude : 88.56690301559865,88.56728062033653
file name : Image_16032022155658432.png
|
2022-03-16 15:56:58.506624 |
349 |
39065965 |
Construction of blacktop road from Kalipada Pal to Amal Pal at Mrigi |
349448 |
Construction of blacktop road from Kalipada Pal to Amal Pal at Mrigi1 |
Plinth level |
-
latitude : 23.7356338,23.7356218,23.7356218
Longitude : 88.5232243,88.523224,88.5232241
file name : Image_13012024134039738.png
|
2024-01-13 13:40:39.838357 |
350 |
39065965 |
Construction of blacktop road from Kalipada Pal to Amal Pal at Mrigi |
349448 |
Construction of blacktop road from Kalipada Pal to Amal Pal at Mrigi1 |
Completion of work |
-
latitude : 23.848780025728047,23.848752113990486
Longitude : 88.52858732454479,88.52860802784562
file name : Image_24082021141429618.png
|
2021-08-24 14:14:29.688774 |
351 |
61153129 |
PCC Road from Haren Biswas to Dilip Biswas at Khanjipur |
194833 |
PCC Road from Haren Biswas to Dilip Biswas at Khanjipur1 |
Plinth level |
-
latitude : 23.7356217,23.7356217
Longitude : 88.523224,88.5232237
file name : Image_13012024134626919.png
|
2024-01-13 13:46:27.018227 |
352 |
61153129 |
PCC Road from Haren Biswas to Dilip Biswas at Khanjipur |
194833 |
PCC Road from Haren Biswas to Dilip Biswas at Khanjipur1 |
Completion of work |
-
latitude : 23.8409779,23.8409779
Longitude : 88.5684206,88.5684206
file name : Image_16032022155654100.png
|
2022-03-16 15:56:54.167699 |
353 |
61156983 |
pcc road from pucca rasta to bipad bhanjan |
121942 |
pcc road from pucca rasta to bipad bhanjan1 |
Plinth level |
-
latitude : 23.7356216,23.7356217
Longitude : 88.5232243,88.523224
file name : Image_13012024134835029.png
|
2024-01-13 13:48:35.124603 |
354 |
61156983 |
pcc road from pucca rasta to bipad bhanjan |
121942 |
pcc road from pucca rasta to bipad bhanjan1 |
Completion of work |
-
latitude : 23.84014880284667,23.84010794106871
Longitude : 88.56415123678744,88.56422047130764
file name : Image_27022022175344547.png
|
2022-02-27 17:53:44.625901 |
355 |
69581412 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.8455375,23.8455375
Longitude : 88.5701916,88.5701916
file name : Image_27032024135754236.png
|
2024-03-27 13:57:54.418214 |
356 |
69581412 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.8455375,23.8455375
Longitude : 88.5701916,88.5701916
file name : Image_27032024135738513.png
|
2024-03-27 13:57:38.644313 |
357 |
69581412 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.8455375,23.8455375
Longitude : 88.5701916,88.5701916
file name : Image_27032024135539398.png
|
2024-03-27 13:55:39.493024 |
358 |
69581412 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.845988333333334,23.8455375
Longitude : 88.57116166666668,88.5701916
file name : Image_27032024135132879.png
|
2024-03-27 13:51:32.979023 |
359 |
69581412 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.84585666666667,23.845863333333334
Longitude : 88.57112166666666,88.57110666666668
file name : Image_21032024132721125.png
|
2024-03-21 13:27:21.252958 |
360 |
68574989 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.8518371,23.8518371
Longitude : 88.5456135,88.5456135
file name : Image_27032024160643313.png
|
2024-03-27 16:06:43.260816 |
361 |
68574989 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.8518371,23.8518371
Longitude : 88.5456135,88.5456135
file name : Image_27032024160457188.png
|
2024-03-27 16:04:54.144137 |
362 |
68574989 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.8518371,23.8518371
Longitude : 88.5456135,88.5456135
file name : Image_02042024140758526.png
|
2024-04-02 14:07:58.62398 |
363 |
68574989 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.8518371,23.8518371
Longitude : 88.5456135,88.5456135
file name : Image_27032024155920286.png
|
2024-03-27 15:59:20.389914 |
364 |
68574989 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.8486455,23.8486455
Longitude : 88.5658603,88.5658603
file name : Image_27032024140205320.png
|
2024-03-27 14:02:05.455728 |
365 |
69577770 |
Construction of roads |
250000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.840126666666666,23.840115
Longitude : 88.56393833333335,88.56399833333334
file name : Image_27032024133842752.png
|
2024-03-27 13:38:42.866266 |
366 |
69577770 |
Construction of roads |
250000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.840120000000002,23.840138333333336
Longitude : 88.56394833333334,88.56399333333333
file name : Image_27032024133523385.png
|
2024-03-27 13:35:23.475194 |
367 |
69577770 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.840108333333333,23.840115
Longitude : 88.56397166666666,88.56399333333333
file name : Image_27032024133110785.png
|
2024-03-27 13:31:10.910609 |
368 |
69577770 |
Construction of roads |
250000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.840126666666666,23.840131666666668
Longitude : 88.56401,88.564005
file name : Image_27032024132623691.png
|
2024-03-27 13:26:23.792316 |
369 |
69580129 |
Repairing and maintenance of roads |
350000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 23.864723333333338,23.86471333333333
Longitude : 88.56628666666666,88.56631
file name : Image_09042024135533877.png
|
2024-04-09 13:55:33.964285 |
370 |
69580129 |
Repairing and maintenance of roads |
350000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 23.864746666666665,23.864741666666667
Longitude : 88.56619333333335,88.56619666666666
file name : Image_09042024132346416.png
|
2024-04-09 13:23:46.507324 |
371 |
69580129 |
Repairing and maintenance of roads |
350000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 23.86471333333333,23.864725
Longitude : 88.56621833333332,88.56622999999999
file name : Image_09042024132338854.png
|
2024-04-09 13:23:38.998949 |
372 |
69580129 |
Repairing and maintenance of roads |
350000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 23.8586074,23.8586074
Longitude : 88.5578194,88.5578194
file name : Image_03042024125253012.png
|
2024-04-03 12:52:53.113155 |
373 |
39071605 |
Construction of Drain of DTW at Mrigi Natunpara |
347563 |
Construction of Drain of DTW at Mrigi Natunpara1 |
Plinth level |
-
latitude : 23.7356218,23.7356217
Longitude : 88.523224,88.5232237
file name : Image_13012024134321684.png
|
2024-01-13 13:43:21.777596 |
374 |
39071605 |
Construction of Drain of DTW at Mrigi Natunpara |
347563 |
Construction of Drain of DTW at Mrigi Natunpara1 |
Completion of work |
-
latitude : 23.857127856463194,23.857113691046834
Longitude : 88.52825053967535,88.52822807617486
file name : Image_19082021114859713.png
|
2021-08-19 11:48:59.794174 |
375 |
67311721 |
Creation of a new source of drinking water |
69959 |
Installation of water purifier at Chhitka GP office Chhitka GP (Blue Star ) |
Roof laid |
-
latitude : 23.8517988
Longitude : 88.5455498
file name : Image_23042024145849588.png
|
2024-04-23 14:58:49.682989 |
376 |
67311721 |
Creation of a new source of drinking water |
69959 |
Installation of water purifier at Chhitka GP office Chhitka GP (Blue Star ) |
Plinth level |
-
latitude : 23.8519546
Longitude : 88.5455582
file name : Image_23042024144915354.png
|
2024-04-23 14:49:15.458925 |
377 |
67311721 |
Creation of a new source of drinking water |
69959 |
Installation of water purifier at Chhitka GP office Chhitka GP (Blue Star ) |
Completion of work |
-
latitude : 23.8517988
Longitude : 88.5455498
file name : Image_23042024135856903.png
|
2024-04-23 13:58:57.009089 |
378 |
76490940 |
Inst. Solar Light at 3 nos point of Chhitka Villege |
99995 |
Inst. Solar Light at 3 nos point of Chhitka Villege1 |
Roof laid |
-
latitude : 23.856138333333334
Longitude : 88.55060999999999
file name : Image_12032024145140811.png
|
2024-03-12 14:51:40.899541 |
379 |
76490940 |
Inst. Solar Light at 3 nos point of Chhitka Villege |
99995 |
Inst. Solar Light at 3 nos point of Chhitka Villege1 |
Plinth level |
-
latitude : 23.85613
Longitude : 88.55062666666666
file name : Image_12032024144616533.png
|
2024-03-12 14:46:16.634827 |
380 |
76490940 |
Inst. Solar Light at 3 nos point of Chhitka Villege |
99995 |
Inst. Solar Light at 3 nos point of Chhitka Villege1 |
Completion of work |
-
latitude : 23.856201666666667
Longitude : 88.55064833333333
file name : Image_12032024144103897.png
|
2024-03-12 14:41:04.010621 |
381 |
76490940 |
Inst. Solar Light at 3 nos point of Chhitka Villege |
99995 |
Inst. Solar Light at 3 nos point of Chhitka Villege1 |
Completion of work |
-
latitude : 23.85614333333333
Longitude : 88.55064166666668
file name : Image_12032024144056913.png
|
2024-03-12 14:40:57.010689 |
382 |
76491467 |
Inst. of Solar Light at 2 nos point to both sides of wooden bridge at khanjipur |
65995 |
Inst. of Solar Light at 2 nos point to both sides of wooden bridge at khanjipur1 |
Plinth level |
-
latitude : 23.8412344
Longitude : 88.5683987
file name : Image_12032024140747146.png
|
2024-03-12 14:07:47.246454 |
383 |
76491467 |
Inst. of Solar Light at 2 nos point to both sides of wooden bridge at khanjipur |
65995 |
Inst. of Solar Light at 2 nos point to both sides of wooden bridge at khanjipur1 |
Completion of work |
-
latitude : 23.208813333333335
Longitude : 88.57212
file name : Image_07032024160328109.png
|
2024-03-07 16:03:28.237213 |
384 |
67311826 |
Shed Construction at the land of Dhiren Biswas at Mobarakpur |
99600 |
Additional work of Shed Construction at the land of Dhiren Biswas at Mobarakpur under Chhitka G.P |
Roof laid |
-
latitude : 23.8412344
Longitude : 88.5683987
file name : Image_12032024135044678.png
|
2024-03-12 13:50:44.870412 |
385 |
67311826 |
Shed Construction at the land of Dhiren Biswas at Mobarakpur |
99600 |
Additional work of Shed Construction at the land of Dhiren Biswas at Mobarakpur under Chhitka G.P |
Plinth level |
-
latitude : 23.8412344
Longitude : 88.5683987
file name : Image_12032024134445801.png
|
2024-03-12 13:44:45.888109 |
386 |
67311826 |
Shed Construction at the land of Dhiren Biswas at Mobarakpur |
99600 |
Additional work of Shed Construction at the land of Dhiren Biswas at Mobarakpur under Chhitka G.P |
Completion of work |
-
latitude : 23.8412344
Longitude : 88.5683987
file name : Image_12032024133942792.png
|
2024-03-12 13:39:42.893135 |
387 |
89737853 |
Repair of drainage channel |
81444 |
Repair of drainage channel1 |
Roof laid |
-
latitude : 23.857915000000002
Longitude : 88.556005
file name : Image_12032024143417582.png
|
2024-03-12 14:34:17.66844 |
388 |
89737853 |
Repair of drainage channel |
81444 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 23.857876666666666
Longitude : 88.55602166666668
file name : Image_12032024143218903.png
|
2024-03-12 14:32:18.993589 |
389 |
89737853 |
Repair of drainage channel |
81444 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 23.857925
Longitude : 88.55602833333333
file name : Image_12032024142735160.png
|
2024-03-12 14:27:35.250957 |
390 |
89737527 |
Drainage Construction |
300000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.84465
Longitude : 88.54456499999999
file name : Image_20052024131404043.png
|
2024-05-20 13:14:04.099053 |
391 |
89737527 |
Drainage Construction |
300000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.84463
Longitude : 88.54454
file name : Image_20052024131010721.png
|
2024-05-20 13:10:10.775683 |
392 |
89737527 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.8446
Longitude : 88.54454333333334
file name : Image_20052024123541149.png
|
2024-05-20 12:35:41.203252 |
393 |
89737691 |
Drainage Construction |
300000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.837128333333332
Longitude : 88.56262666666667
file name : Image_24052024120222185.png
|
2024-05-24 12:02:22.239713 |
394 |
89737691 |
Drainage Construction |
300000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.837108333333337
Longitude : 88.56264166666666
file name : Image_24052024115947271.png
|
2024-05-24 11:59:47.329647 |
395 |
89737691 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.837136666666666
Longitude : 88.56265166666665
file name : Image_24052024115408457.png
|
2024-05-24 11:54:08.515509 |
396 |
69588891 |
Installation of Solar lights |
150000 |
Installation of Solar lights1 |
Roof laid |
-
latitude : 23.8517936
Longitude : 88.5455219
file name : Image_06092024140154280.png
|
2024-09-06 14:01:54.72822 |
397 |
69588891 |
Installation of Solar lights |
150000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.8517995
Longitude : 88.5455047
file name : Image_06092024134038181.png
|
2024-09-06 13:41:24.582118 |
398 |
69588891 |
Installation of Solar lights |
150000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.8589408
Longitude : 88.5586971
file name : Image_18032024134045118.png
|
2024-03-18 13:40:45.220412 |
399 |
68573348 |
Construction of roads |
100000 |
Construction of PCC road from near Nazirpur High School to H o Shukdeb Biswas at Nazirpur under Chhitka G |
Plinth level |
-
latitude : 23.8748148,23.8748148
Longitude : 88.5358595,88.5358595
file name : Image_21032024121530294.png
|
2024-03-21 12:15:30.391901 |
400 |
68573348 |
Construction of roads |
100000 |
Construction of PCC road from near Nazirpur High School to H o Shukdeb Biswas at Nazirpur under Chhitka G |
Completion of work |
-
latitude : 23.8746679,23.8747111
Longitude : 88.5359559,88.5359363
file name : Image_18032024132526968.png
|
2024-03-18 13:25:27.07609 |
401 |
69584018 |
Installation of Solar lights |
100000 |
Installation of Solar light of 3 Nos at Bagadoba under chhitka GP 15th CFC 2023 24 sansad no 8 |
Roof laid |
-
latitude : 23.8664834
Longitude : 88.5373017
file name : Image_27032024154226054.png
|
2024-03-27 15:42:26.225131 |
402 |
69584018 |
Installation of Solar lights |
100000 |
Installation of Solar light of 3 Nos at Bagadoba under chhitka GP 15th CFC 2023 24 sansad no 8 |
Plinth level |
-
latitude : 23.8664834
Longitude : 88.5373017
file name : Image_27032024153837533.png
|
2024-03-27 15:38:37.689605 |
403 |
69584018 |
Installation of Solar lights |
100000 |
Installation of Solar light of 3 Nos at Bagadoba under chhitka GP 15th CFC 2023 24 sansad no 8 |
Plinth level |
-
latitude : 23.871284999999997
Longitude : 88.53863666666666
file name : Image_21032024155543600.png
|
2024-03-21 15:55:43.790312 |
404 |
69584018 |
Installation of Solar lights |
100000 |
Installation of Solar light of 3 Nos at Bagadoba under chhitka GP 15th CFC 2023 24 sansad no 8 |
Plinth level |
-
latitude : 23.871313333333333
Longitude : 88.53869000000002
file name : Image_21032024155537631.png
|
2024-03-21 15:55:37.801141 |
405 |
69584018 |
Installation of Solar lights |
100000 |
Installation of Solar light of 3 Nos at Bagadoba under chhitka GP 15th CFC 2023 24 sansad no 8 |
Completion of work |
-
latitude : 23.871325000000002
Longitude : 88.53863000000001
file name : Image_21032024123104168.png
|
2024-03-21 12:31:04.297903 |
406 |
89737048 |
Drainage Construction |
300000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.855055
Longitude : 88.52555833333332
file name : Image_11062024132743734.png
|
2024-06-11 13:27:43.788659 |
407 |
89737048 |
Drainage Construction |
300000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.855063333333337
Longitude : 88.52554833333333
file name : Image_11062024132401080.png
|
2024-06-11 13:24:01.137448 |
408 |
89737048 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.855055
Longitude : 88.52551333333334
file name : Image_10062024140524139.png
|
2024-06-10 14:05:24.192659 |
409 |
89172243 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure |
150000 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure1 |
Plinth level |
-
latitude : 23.853796666666668
Longitude : 88.54490499999999
file name : Image_09092024145700273.png
|
2024-09-09 14:58:44.99066 |
410 |
89172243 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure |
150000 |
Grey Water management- collection infrastructure/treatment and reuse infrastructure1 |
Completion of work |
-
latitude : 23.85128166666667
Longitude : 88.54603666666665
file name : Image_09092024145151830.png
|
2024-09-09 14:53:36.485795 |
411 |
89736663 |
Drainage Construction |
300000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.848425
Longitude : 88.56368833333333
file name : Image_24092024130001485.png
|
2024-09-24 13:00:01.562234 |
412 |
89736663 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.848439999999997
Longitude : 88.56363666666667
file name : Image_24092024125731605.png
|
2024-09-24 12:57:31.723074 |
413 |
67311620 |
Creation of a new source of drinking water |
69959 |
Installation of water purifier at Naboday sishu niketan at Nazirpur Under Chhitka GP (Blue Star ) |
Roof laid |
-
latitude : 23.8650796
Longitude : 88.5369833
file name : Image_02052023140236245.png
|
2023-05-02 14:02:36.340336 |
414 |
76510207 |
Creation of a new source of drinking water |
170000 |
installation of water purifier at Mobarakpur GSF Pry School and Mobarakpur Camp Colony 2 Nos Under Chhitk |
Roof laid |
-
latitude : 23.837335
Longitude : 88.55583
file name : Image_29082023114540027.png
|
2023-08-29 11:45:40.147474 |
415 |
76510207 |
Creation of a new source of drinking water |
170000 |
installation of water purifier at Mobarakpur GSF Pry School and Mobarakpur Camp Colony 2 Nos Under Chhitk |
Roof laid |
-
latitude : 23.8502435
Longitude : 88.5653129
file name : Image_29052023144156495.png
|
2023-05-29 14:41:56.582053 |
416 |
76509726 |
Creation of a new source of drinking water |
255000 |
Installation of water purifier at Mirgi Dhuluri para Pry School and Nazirpur Pry School and Mirgi Natunpa |
Plinth level |
-
latitude : 23.8517908
Longitude : 88.5455515
file name : Image_13072024155115413.png
|
2024-07-13 15:51:15.469204 |
417 |
76509726 |
Creation of a new source of drinking water |
255000 |
Installation of water purifier at Mirgi Dhuluri para Pry School and Nazirpur Pry School and Mirgi Natunpa |
Completion of work |
-
latitude : 23.8710473
Longitude : 88.5366717
file name : Image_14092023161020685.png
|
2023-09-14 16:10:20.783664 |
418 |
76509259 |
Creation of a new source of drinking water |
255000 |
Installation of water purifier at Khanjipur GSF Pry School and Astullanagar Health Sub Centre and Chhitk |
Roof laid |
-
latitude : 23.851846666666667
Longitude : 88.54185833333334
file name : Image_26052023122534869.png
|
2023-05-26 12:25:34.986075 |
419 |
76508743 |
Creation of a new source of drinking water |
255000 |
Installation of water purifier at Mobarakpur High School and Mobarakpur Pry School and Haripur Bazar Pry |
Plinth level |
-
latitude : 23.851792
Longitude : 88.5455506
file name : Image_13072024154327906.png
|
2024-07-13 15:43:28.003463 |
420 |
76508743 |
Creation of a new source of drinking water |
255000 |
Installation of water purifier at Mobarakpur High School and Mobarakpur Pry School and Haripur Bazar Pry |
Completion of work |
-
latitude : 23.8372171
Longitude : 88.5523729
file name : Image_14092023161024113.png
|
2023-09-14 16:10:24.211422 |
421 |
69579555 |
Installation of Solar lights |
100000 |
Installation of solar light near Durgamandir Mrigi Lakshmitala and Mrigi Kalitala at Mrigi Boardpara at M |
Roof laid |
-
latitude : 23.8534158
Longitude : 88.5258294
file name : Image_02042024153809328.png
|
2024-04-02 15:38:09.418572 |
422 |
69579555 |
Installation of Solar lights |
100000 |
Installation of solar light near Durgamandir Mrigi Lakshmitala and Mrigi Kalitala at Mrigi Boardpara at M |
Roof laid |
-
latitude : 23.8534158
Longitude : 88.5258294
file name : Image_02042024153805205.png
|
2024-04-02 15:38:05.294637 |
423 |
69579555 |
Installation of Solar lights |
100000 |
Installation of solar light near Durgamandir Mrigi Lakshmitala and Mrigi Kalitala at Mrigi Boardpara at M |
Plinth level |
-
latitude : 23.8534158
Longitude : 88.5258294
file name : Image_02042024153354839.png
|
2024-04-02 15:33:54.923699 |
424 |
69579555 |
Installation of Solar lights |
100000 |
Installation of solar light near Durgamandir Mrigi Lakshmitala and Mrigi Kalitala at Mrigi Boardpara at M |
Completion of work |
-
latitude : 23.853681666666663
Longitude : 88.526265
file name : Image_02042024152751280.png
|
2024-04-02 15:27:51.373258 |
425 |
68623868 |
Drainage Construction |
180000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.844011666666667
Longitude : 88.54611666666666
file name : Image_16012024124613539.png
|
2024-01-16 12:46:13.637477 |
426 |
68623868 |
Drainage Construction |
180000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.84400666666667
Longitude : 88.54611833333333
file name : Image_15012024143348059.png
|
2024-01-15 14:33:48.141688 |
427 |
68623868 |
Drainage Construction |
180000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.843981666666664
Longitude : 88.54615
file name : Image_15012024142900421.png
|
2024-01-15 14:29:00.505593 |
428 |
69585433 |
Construction of roads |
200000 |
Construction of PCC road from h o Mora Roy to H O Jugal Mandal at Haripur under chhitka GP 15th CFC 2023 |
Roof laid |
-
latitude : 23.8314962,23.8314962
Longitude : 88.5455852,88.5455852
file name : Image_27122023161028455.png
|
2023-12-27 16:10:28.55235 |
429 |
69585433 |
Construction of roads |
200000 |
Construction of PCC road from h o Mora Roy to H O Jugal Mandal at Haripur under chhitka GP 15th CFC 2023 |
Roof laid |
-
latitude : 23.8314962,23.8314962
Longitude : 88.5455852,88.5455852
file name : Image_27122023161019933.png
|
2023-12-27 16:10:20.030268 |
430 |
69585433 |
Construction of roads |
200000 |
Construction of PCC road from h o Mora Roy to H O Jugal Mandal at Haripur under chhitka GP 15th CFC 2023 |
Plinth level |
-
latitude : 23.831226666666666,23.83121833333333
Longitude : 88.54538833333332,88.54537499999999
file name : Image_26122023143640099.png
|
2023-12-26 14:36:40.198803 |
431 |
69585433 |
Construction of roads |
200000 |
Construction of PCC road from h o Mora Roy to H O Jugal Mandal at Haripur under chhitka GP 15th CFC 2023 |
Completion of work |
-
latitude : 23.83137166666667,23.83137333333333
Longitude : 88.54528666666666,88.54531166666666
file name : Image_04122023153647684.png
|
2023-12-04 15:36:47.776715 |
432 |
69590802 |
Construction of roads |
150000 |
Construction of PCC road from Dhalai rasta to H O Ratan Biswas at Chhitka under Chhitka Gp 15th CFC 2023 |
Plinth level |
-
latitude : 23.8550514,23.8550514
Longitude : 88.5464821,88.5464821
file name : Image_18122023153202097.png
|
2023-12-18 15:32:02.189496 |
433 |
69590802 |
Construction of roads |
150000 |
Construction of PCC road from Dhalai rasta to H O Ratan Biswas at Chhitka under Chhitka Gp 15th CFC 2023 |
Plinth level |
-
latitude : 23.8550514,23.8550514
Longitude : 88.5464821,88.5464821
file name : Image_18122023133403597.png
|
2023-12-18 13:34:03.694072 |
434 |
69590802 |
Construction of roads |
150000 |
Construction of PCC road from Dhalai rasta to H O Ratan Biswas at Chhitka under Chhitka Gp 15th CFC 2023 |
Completion of work |
-
latitude : 23.8553669,23.8553669
Longitude : 88.5442067,88.5442067
file name : Image_15122023135400639.png
|
2023-12-15 13:54:00.727392 |
435 |
69584697 |
Construction of roads |
250000 |
Construction of PCC road from H O Babu Saha to H O Dulal Das at Chhitka Doctorpara under Chhitka Gp |
Plinth level |
-
latitude : 23.856603333333336,23.856596666666665
Longitude : 88.54234333333333,88.54233666666666
file name : Image_11122023131831212.png
|
2023-12-11 13:18:31.318703 |
436 |
69584697 |
Construction of roads |
250000 |
Construction of PCC road from H O Babu Saha to H O Dulal Das at Chhitka Doctorpara under Chhitka Gp |
Completion of work |
-
latitude : 23.8518592,23.414753333333337
Longitude : 88.5455108,88.50029500000001
file name : Image_05122023140535139.png
|
2023-12-05 14:05:35.236667 |
437 |
69587530 |
Repairing and maintenance of roads |
300000 |
Repairing of Blacktop road from H O Sentu kar to H O saran saha at bagadoba under chhitka GP 15th CFC |
Plinth level |
-
latitude : 23.572613333333333,23.572613333333333
Longitude : 88.52643833333335,88.52643833333335
file name : Image_16122023123749967.png
|
2023-12-16 12:37:50.05806 |
438 |
69587530 |
Repairing and maintenance of roads |
300000 |
Repairing of Blacktop road from H O Sentu kar to H O saran saha at bagadoba under chhitka GP 15th CFC |
Completion of work |
-
latitude : 23.870236,23.870236
Longitude : 88.5393251,88.5393251
file name : Image_15122023134022087.png
|
2023-12-15 13:40:22.185512 |
439 |
68634984 |
Drinking water facility |
350000 |
Drinking water facility1 |
Roof laid |
-
latitude : 23.8678864
Longitude : 88.5367967
file name : Image_10092024124733425.png
|
2024-09-10 12:47:36.828672 |
440 |
68634984 |
Drinking water facility |
350000 |
Drinking water facility1 |
Plinth level |
-
latitude : 23.8678849
Longitude : 88.5367913
file name : Image_10092024124053589.png
|
2024-09-10 12:40:56.998524 |
441 |
68634984 |
Drinking water facility |
350000 |
Drinking water facility1 |
Completion of work |
-
latitude : 23.871785
Longitude : 88.53629333333335
file name : Image_02092024113908062.png
|
2024-09-02 11:39:08.156354 |
442 |
107604771 |
Water Supply to villages |
220000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 23.871741
Longitude : 88.5361963
file name : Image_12092024152018518.png
|
2024-09-12 15:20:18.571016 |
443 |
107604771 |
Water Supply to villages |
220000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 23.87175
Longitude : 88.53632166666667
file name : Image_12092024152013107.png
|
2024-09-12 15:20:13.17235 |
444 |
107604771 |
Water Supply to villages |
220000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 23.85170333333333
Longitude : 88.54550833333333
file name : Image_12092024151212730.png
|
2024-09-12 15:12:12.782337 |
445 |
107604771 |
Water Supply to villages |
220000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.8716917
Longitude : 88.536402
file name : Image_12092024150654255.png
|
2024-09-12 15:06:54.309403 |
446 |
89171495 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.850620000000003
Longitude : 88.56522500000001
file name : Image_20092024155522546.png
|
2024-09-20 15:55:22.600952 |
447 |
89171495 |
Construction of toilets in public institutions |
350000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.850596666666668
Longitude : 88.56525166666667
file name : Image_20092024155008324.png
|
2024-09-20 15:50:08.437247 |
448 |
67308769 |
Creation of drainage channel for management of grey water |
350000 |
Construction of pucca drain from the house of Nepal Hira to Khal at Ilshamari under Chhitka G.P. |
Roof laid |
-
latitude : 23.853931666666668
Longitude : 88.54540833333334
file name : Image_18052023162011792.png
|
2023-05-18 16:20:11.897926 |
449 |
67308769 |
Creation of drainage channel for management of grey water |
350000 |
Construction of pucca drain from the house of Nepal Hira to Khal at Ilshamari under Chhitka G.P. |
Completion of work |
-
latitude : 23.8467359
Longitude : 88.5678797
file name : Image_18052023124229017.png
|
2023-05-18 12:42:29.142602 |
450 |
67308810 |
Creation of drainage channel for management of grey water |
350000 |
Construction of pucca drain from the house of Mridul Roy to the house of Nepal Hira at Ilshamari under Ch |
Roof laid |
-
latitude : 23.8468785
Longitude : 88.5682289
file name : Image_19052023130836233.png
|
2023-05-19 13:08:36.331801 |
451 |
67308810 |
Creation of drainage channel for management of grey water |
350000 |
Construction of pucca drain from the house of Mridul Roy to the house of Nepal Hira at Ilshamari under Ch |
Completion of work |
-
latitude : 23.846090000000004
Longitude : 88.56898333333332
file name : Image_18052023124936066.png
|
2023-05-18 12:49:36.164372 |
452 |
76483142 |
PCC Road From h/o Krishna Sarkar to h/o Narayan Sarkar at Mirgi |
150000 |
PCC Road From h/o Krishna Sarkar to h/o Narayan Sarkar at Mirgi1 |
Roof laid |
-
latitude : 23.85164666666667,23.85162833333333
Longitude : 88.52853833333332,88.52856166666668
file name : Image_28062023132144181.png
|
2023-06-28 13:21:44.277378 |
453 |
59691972 |
Cons of blactop road from H/O Naresh Biswas to Jiban Biswas at Mobarakpur |
300000 |
Cons of blactop road from H/O Naresh Biswas to Jiban Biswas at Mobarakpur1 |
Plinth level |
-
latitude : 23.8517884,23.8517903
Longitude : 88.5455507,88.5455517
file name : Image_12072024154506175.png
|
2024-07-12 15:45:06.608566 |
454 |
59691972 |
Cons of blactop road from H/O Naresh Biswas to Jiban Biswas at Mobarakpur |
300000 |
Cons of blactop road from H/O Naresh Biswas to Jiban Biswas at Mobarakpur1 |
Completion of work |
-
latitude : 23.857751666666665,23.8409732
Longitude : 88.515085,88.5778811
file name : Image_14082023143715931.png
|
2023-08-14 14:37:16.034333 |
455 |
59691972 |
Cons of blactop road from H/O Naresh Biswas to Jiban Biswas at Mobarakpur |
300000 |
Cons of blactop road from H/O Naresh Biswas to Jiban Biswas at Mobarakpur1 |
Completion of work |
-
latitude : 23.8409732,23.8409732
Longitude : 88.5778811,88.5778811
file name : Image_14082023130318444.png
|
2023-08-14 13:03:18.556673 |
456 |
59691972 |
Cons of blactop road from H/O Naresh Biswas to Jiban Biswas at Mobarakpur |
300000 |
Cons of blactop road from H/O Naresh Biswas to Jiban Biswas at Mobarakpur1 |
Completion of work |
-
latitude : 23.8517899,23.8517899
Longitude : 88.5455285,88.5455285
file name : Image_25072023154115933.png
|
2023-07-25 15:41:16.040724 |
457 |
59719229 |
Cons of Community Toilet near Gobinda Mandir at Mobarakpur |
330155 |
Cons of Community Toilet near Gobinda Mandir at Mobarakpur1 |
Plinth level |
-
latitude : 23.8517898
Longitude : 88.5455517
file name : Image_12072024161640293.png
|
2024-07-12 16:16:40.355212 |
458 |
59719229 |
Cons of Community Toilet near Gobinda Mandir at Mobarakpur |
330155 |
Cons of Community Toilet near Gobinda Mandir at Mobarakpur1 |
Completion of work |
-
latitude : 23.83917
Longitude : 88.57618333333333
file name : Image_27032023144859353.png
|
2023-03-27 14:48:59.44607 |
459 |
76499646 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.8517918
Longitude : 88.545551
file name : Image_15072024121502218.png
|
2024-07-15 12:15:02.276375 |
460 |
76499646 |
Construction of Community Sanitary Complex |
350000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.8518596
Longitude : 88.5455285
file name : Image_20092023132941378.png
|
2023-09-20 13:29:41.495216 |
461 |
67311341 |
Creation of a new source of drinking water |
63624 |
institutional of 2 nos new ordinary Tubewell at Chhitka 11 pota (273) and Mirgi Bill Para(343) ICDS Cente |
Roof laid |
-
latitude : 23.840135
Longitude : 88.541265
file name : Image_02052023151159304.png
|
2023-05-02 15:11:59.429827 |
462 |
67311214 |
Creation of a new source of drinking water |
95433 |
institutional of 3 nos new ordinary Tubewell at Bagadoba Namasudtrapara (205) , Mirgi Guptipara(266) an |
Roof laid |
-
latitude : 23.84723166666667
Longitude : 88.56720333333332
file name : Image_18042023152222634.png
|
2023-04-18 15:22:22.743796 |
463 |
67310554 |
Creation of a new source of drinking water |
95433 |
institutional of 3 nos new ordinary Tubewell at Khanjipur (126), Ilshamari Battala (134) and Mirgi Dhulur |
Roof laid |
-
latitude : 23.871121666666667
Longitude : 88.57391833333334
file name : Image_02052023153559852.png
|
2023-05-02 15:35:59.952841 |
464 |
67310554 |
Creation of a new source of drinking water |
95433 |
institutional of 3 nos new ordinary Tubewell at Khanjipur (126), Ilshamari Battala (134) and Mirgi Dhulur |
Roof laid |
-
latitude : 23.871116666666662
Longitude : 88.57395666666667
file name : Image_02052023153651162.png
|
2023-05-02 15:36:51.254205 |
465 |
67310769 |
Creation of a new source of drinking water |
95433 |
institutional of 3 nos new ordinary Tubewell at Chhitka Panchayat Para (137), Astullanagar Purbapara (134 |
Roof laid |
-
latitude : 23.85207833333333
Longitude : 88.54272999999999
file name : Image_02052023151901927.png
|
2023-05-02 15:19:02.021689 |
466 |
67309690 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.851793
Longitude : 88.5455496
file name : Image_13072024142840982.png
|
2024-07-13 14:28:41.04289 |
467 |
67309690 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.851792
Longitude : 88.5455506
file name : Image_12072024161940521.png
|
2024-07-12 16:19:40.584275 |
468 |
67309690 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.83681
Longitude : 88.55328499999999
file name : Image_07082023155520281.png
|
2023-08-07 15:55:20.383371 |
469 |
76483858 |
PCC Road from h/o Tapan Dhali towards h/o Goutam Biswas at Chhitka |
169995 |
PCC Road from h/o Tapan Dhali towards h/o Goutam Biswas at Chhitka1 |
Plinth level |
-
latitude : 23.85757833333333,23.857576666666667,23.85758166666667
Longitude : 88.55793999999999,88.55797,88.55797499999998
file name : Image_08062023141405217.png
|
2023-06-08 14:14:05.314427 |
470 |
76483858 |
PCC Road from h/o Tapan Dhali towards h/o Goutam Biswas at Chhitka |
169995 |
PCC Road from h/o Tapan Dhali towards h/o Goutam Biswas at Chhitka1 |
Plinth level |
-
latitude : 23.8518092,23.8518092
Longitude : 88.5455546,88.5455546
file name : Image_07062023122621781.png
|
2023-06-07 12:26:21.894427 |
471 |
76493998 |
Cons. of BT Road From the house of Rintu Das bairagya to h/o Pulok Gupta at Mirgi |
300000 |
Cons. of BT Road From the house of Rintu Das bairagya to h/o Pulok Gupta at Mirgi1 |
Plinth level |
-
latitude : 23.851792,23.8517926
Longitude : 88.5455492,88.5455487
file name : Image_15072024123609721.png
|
2024-07-15 12:36:09.782001 |
472 |
76493998 |
Cons. of BT Road From the house of Rintu Das bairagya to h/o Pulok Gupta at Mirgi |
300000 |
Cons. of BT Road From the house of Rintu Das bairagya to h/o Pulok Gupta at Mirgi1 |
Completion of work |
-
latitude : 23.857630000000004,23.857635
Longitude : 88.51488666666667,88.51486500000001
file name : Image_14082023140852219.png
|
2023-08-14 14:08:52.317477 |
473 |
89508534 |
Construction of Building |
350000 |
Construction of Building1 |
Roof laid |
-
latitude : 23.851793
Longitude : 88.5455417
file name : Image_13072024141338315.png
|
2024-07-13 14:13:38.377124 |
474 |
89508534 |
Construction of Building |
350000 |
Construction of Building1 |
Roof laid |
-
latitude : 23.8517926
Longitude : 88.5455508
file name : Image_12072024170845003.png
|
2024-07-12 17:08:45.059933 |
475 |
89508534 |
Construction of Building |
350000 |
Construction of Building1 |
Roof laid |
-
latitude : 23.851799
Longitude : 88.5455997
file name : Image_12072024164032699.png
|
2024-07-12 16:40:32.763214 |
476 |
89508534 |
Construction of Building |
350000 |
Construction of Building1 |
Roof laid |
-
latitude : 23.8517927
Longitude : 88.5455504
file name : Image_12072024162831228.png
|
2024-07-12 16:28:31.304666 |
477 |
89508534 |
Construction of Building |
350000 |
Construction of Building1 |
Plinth level |
-
latitude : 23.8518293
Longitude : 88.5456132
file name : Image_12072024134402363.png
|
2024-07-12 13:44:02.420847 |
478 |
89508534 |
Construction of Building |
350000 |
Construction of Building1 |
Completion of work |
-
latitude : 23.8517866
Longitude : 88.5455489
file name : Image_12072024133813287.png
|
2024-07-12 13:38:13.342371 |
479 |
89156093 |
Construction of roads |
140000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.83256833333333,23.832585
Longitude : 88.55756166666667,88.55756166666667
file name : Image_01102024155254865.png
|
2024-10-01 15:52:54.932163 |
480 |
89156093 |
Construction of roads |
140000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.832598333333333,23.832615
Longitude : 88.55755833333333,88.55756500000001
file name : Image_01102024154713885.png
|
2024-10-01 15:47:13.940036 |
481 |
89156093 |
Construction of roads |
140000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.832546666666666,23.832571666666663
Longitude : 88.55756333333332,88.557625
file name : Image_01102024154009971.png
|
2024-10-01 15:40:10.024842 |
482 |
67308828 |
Creation of drainage channel for management of grey water |
350000 |
Construction of community toilet near Haripur Bazar milk mill at Haripur Under Chhitka G.P. |
Plinth level |
-
latitude : 23.8517912
Longitude : 88.5455504
file name : Image_12072024164830538.png
|
2024-07-12 16:48:30.597685 |
483 |
67308828 |
Creation of drainage channel for management of grey water |
350000 |
Construction of community toilet near Haripur Bazar milk mill at Haripur Under Chhitka G.P. |
Completion of work |
-
latitude : 23.8517898
Longitude : 88.5455517
file name : Image_12072024164605101.png
|
2024-07-12 16:46:05.164848 |
484 |
67308828 |
Creation of drainage channel for management of grey water |
350000 |
Construction of community toilet near Haripur Bazar milk mill at Haripur Under Chhitka G.P. |
Completion of work |
-
latitude : 23.8517881
Longitude : 88.5455484
file name : Image_12072024163503108.png
|
2024-07-12 16:35:03.177903 |
485 |
67311686 |
Creation of a new source of drinking water |
69959 |
Installation of water purifier at Mrigi M S K Chhitka GP Blue Star |
Plinth level |
-
latitude : 23.8517898
Longitude : 88.5455517
file name : Image_13072024142142965.png
|
2024-07-13 14:21:43.037463 |
486 |
67311686 |
Creation of a new source of drinking water |
69959 |
Installation of water purifier at Mrigi M S K Chhitka GP Blue Star |
Completion of work |
-
latitude : 23.85463333333333
Longitude : 88.52306333333333
file name : Image_31082023144047072.png
|
2023-08-31 14:40:47.181403 |
487 |
76483495 |
PCC Road From h/o Swpan Bala to h/o Bimal Bala at Astullangar |
250000 |
PCC Road From h/o Swpan Bala to h/o Bimal Bala at Astullangar1 |
Plinth level |
-
latitude : 23.8517908,23.8517882
Longitude : 88.5455515,88.5455476
file name : Image_13072024155436476.png
|
2024-07-13 15:54:36.524017 |
488 |
76483495 |
PCC Road From h/o Swpan Bala to h/o Bimal Bala at Astullangar |
250000 |
PCC Road From h/o Swpan Bala to h/o Bimal Bala at Astullangar1 |
Completion of work |
-
latitude : 23.8518015,23.8518015
Longitude : 88.5455285,88.5455285
file name : Image_01082023140349689.png
|
2023-08-01 14:03:49.780151 |
489 |
76566696 |
Grey water management — collection infrastructure |
325000 |
Grey water management — collection infrastructure1 |
Plinth level |
-
latitude : 23.8517898
Longitude : 88.5455517
file name : Image_13072024155747051.png
|
2024-07-13 15:57:47.099156 |
490 |
76566696 |
Grey water management — collection infrastructure |
325000 |
Grey water management — collection infrastructure1 |
Completion of work |
-
latitude : 23.8518015
Longitude : 88.5455285
file name : Image_01082023142638001.png
|
2023-08-01 14:26:38.137995 |
491 |
89738024 |
Repairing and maintenance of roads |
350000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 23.8552566,23.8552566
Longitude : 88.5442454,88.5442454
file name : Image_18072024174013899.png
|
2024-07-18 17:40:13.963639 |
492 |
89738024 |
Repairing and maintenance of roads |
350000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 23.8549121,23.8553026
Longitude : 88.5443807,88.5441959
file name : Image_18072024173618488.png
|
2024-07-18 17:36:18.542994 |
493 |
89738024 |
Repairing and maintenance of roads |
350000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 23.8552618,23.8552618
Longitude : 88.5442859,88.5442859
file name : Image_18072024173024726.png
|
2024-07-18 17:30:24.786282 |
494 |
89738621 |
Functional Equipment |
110000 |
Functional Equipment1 |
Roof laid |
-
latitude : 23.8517869
Longitude : 88.5455506
file name : Image_18072024180233988.png
|
2024-07-18 18:02:34.040283 |
495 |
89738621 |
Functional Equipment |
110000 |
Functional Equipment1 |
Roof laid |
-
latitude : 23.8517869
Longitude : 88.5455534
file name : Image_18072024180114467.png
|
2024-07-18 18:01:14.532435 |
496 |
89738621 |
Functional Equipment |
110000 |
Functional Equipment1 |
Plinth level |
-
latitude : 23.8517869
Longitude : 88.5455534
file name : Image_18072024175910042.png
|
2024-07-18 17:59:10.096756 |
497 |
89738621 |
Functional Equipment |
110000 |
Functional Equipment1 |
Completion of work |
-
latitude : 23.8517813
Longitude : 88.5455556
file name : Image_18072024175625480.png
|
2024-07-18 17:56:25.538093 |
498 |
89508978 |
Construction of Building |
350000 |
Construction of Building1 |
Plinth level |
-
latitude : 23.8517869
Longitude : 88.5455599
file name : Image_05092024161552833.png
|
2024-09-05 16:15:52.916053 |
499 |
89508978 |
Construction of Building |
350000 |
Construction of Building1 |
Plinth level |
-
latitude : 23.8517839
Longitude : 88.5455598
file name : Image_05092024161235391.png
|
2024-09-05 16:12:35.438761 |
500 |
89508978 |
Construction of Building |
350000 |
Construction of Building1 |
Plinth level |
-
latitude : 23.8517812
Longitude : 88.5455581
file name : Image_08082024134715465.png
|
2024-08-08 13:47:15.519692 |
501 |
89508978 |
Construction of Building |
350000 |
Construction of Building1 |
Completion of work |
-
latitude : 23.8517813
Longitude : 88.5455603
file name : Image_08082024124708833.png
|
2024-08-08 12:47:08.899864 |
502 |
89509151 |
Construction of Building |
350000 |
Construction of Building1 |
Roof laid |
-
latitude : 23.8517926
Longitude : 88.54553
file name : Image_12082024155202333.png
|
2024-08-12 15:52:02.395455 |
503 |
89509151 |
Construction of Building |
350000 |
Construction of Building1 |
Plinth level |
-
latitude : 23.8517815
Longitude : 88.5455541
file name : Image_12082024154431198.png
|
2024-08-12 15:44:31.247589 |
504 |
89509151 |
Construction of Building |
350000 |
Construction of Building1 |
Plinth level |
-
latitude : 23.8517796
Longitude : 88.5455605
file name : Image_08082024134809980.png
|
2024-08-08 13:48:10.032483 |
505 |
89509151 |
Construction of Building |
350000 |
Construction of Building1 |
Completion of work |
-
latitude : 23.8517793
Longitude : 88.5455609
file name : Image_08082024124808292.png
|
2024-08-08 12:48:08.346474 |
506 |
60486340 |
construction agricaltural pacca drain from lo nitayananda haldar to no 3 spout under169 DTw at Mobar |
349454 |
construction agricaltural pacca drain from lo nitayananda haldar to no 3 spout under169 DTw at Mobar1 |
Plinth level |
-
latitude : 23.7356218,23.735622,23.7356215
Longitude : 88.5232241,88.5232242,88.523224
file name : Image_13012024131436242.png
|
2024-01-13 13:14:36.353473 |
507 |
60486340 |
construction agricaltural pacca drain from lo nitayananda haldar to no 3 spout under169 DTw at Mobar |
349454 |
construction agricaltural pacca drain from lo nitayananda haldar to no 3 spout under169 DTw at Mobar1 |
Plinth level |
-
latitude : 23.7356216,23.7356216
Longitude : 88.5232239,88.523224
file name : Image_13012024131407221.png
|
2024-01-13 13:14:07.314351 |
508 |
60486340 |
construction agricaltural pacca drain from lo nitayananda haldar to no 3 spout under169 DTw at Mobar |
349454 |
construction agricaltural pacca drain from lo nitayananda haldar to no 3 spout under169 DTw at Mobar1 |
Completion of work |
-
latitude : 23.836180893704295,23.835931196808815
Longitude : 88.55827401392162,88.55845296755433
file name : Image_08032022082335112.png
|
2022-03-08 08:23:35.208424 |
509 |
68630455 |
Installation of Tubewell |
200000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 23.835975
Longitude : 88.55403499999998
file name : Image_20082024163737989.png
|
2024-08-20 16:37:38.041054 |
510 |
68630455 |
Installation of Tubewell |
200000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 23.835965
Longitude : 88.55393166666666
file name : Image_20082024163419485.png
|
2024-08-20 16:34:19.553178 |
511 |
68630455 |
Installation of Tubewell |
200000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.83588666666667
Longitude : 88.55407166666667
file name : Image_20082024162428527.png
|
2024-08-20 16:24:28.582738 |
512 |
107421004 |
Augmentation of existing sources of Drinking Water |
100000 |
Augmentation of existing sources of Drinking Water1 |
Roof laid |
-
latitude : 23.8517926
Longitude : 88.5455254
file name : Image_06092024143410722.png
|
2024-09-06 14:34:10.778603 |
513 |
107421004 |
Augmentation of existing sources of Drinking Water |
100000 |
Augmentation of existing sources of Drinking Water1 |
Roof laid |
-
latitude : 23.8517991
Longitude : 88.5455054
file name : Image_06092024142216172.png
|
2024-09-06 14:22:16.471387 |
514 |
107421004 |
Augmentation of existing sources of Drinking Water |
100000 |
Augmentation of existing sources of Drinking Water1 |
Roof laid |
-
latitude : 23.85620333333333
Longitude : 88.53011166666666
file name : Image_20082024170132697.png
|
2024-08-20 17:01:32.751879 |
515 |
107421004 |
Augmentation of existing sources of Drinking Water |
100000 |
Augmentation of existing sources of Drinking Water1 |
Plinth level |
-
latitude : 23.856199999999998
Longitude : 88.530115
file name : Image_20082024165919281.png
|
2024-08-20 16:59:19.33385 |
516 |
107421004 |
Augmentation of existing sources of Drinking Water |
100000 |
Augmentation of existing sources of Drinking Water1 |
Completion of work |
-
latitude : 23.856186666666666
Longitude : 88.53006500000001
file name : Image_20082024165514825.png
|
2024-08-20 16:55:14.881763 |
517 |
89171463 |
Drainage Construction |
275000 |
Drainage Construction1 |
Roof laid |
-
latitude : 23.86567
Longitude : 88.56647
file name : Image_27082024135151740.png
|
2024-08-27 13:51:52.470026 |
518 |
89171463 |
Drainage Construction |
275000 |
Drainage Construction1 |
Plinth level |
-
latitude : 23.865675000000003
Longitude : 88.56653833333333
file name : Image_27082024134440669.png
|
2024-08-27 13:44:41.311742 |
519 |
89171463 |
Drainage Construction |
275000 |
Drainage Construction1 |
Completion of work |
-
latitude : 23.86574333333333
Longitude : 88.56670333333335
file name : Image_20082024133203132.png
|