1 |
48435242 |
Maintenance of existing drinking water system under Lakhanpur GP area |
522494 |
Maintenance of existing drinking water system under Lakhanpur GP area1 |
Plinth level |
-
latitude : 23.33634527
Longitude : 86.58005472
file name : Image_09072022082640155.png
|
2022-07-09 08:26:40.236463 |
2 |
34285463 |
Installation of tubewell at Astatal Pucca rasta |
70000 |
Installation of tubewell at Astatal Pucca rasta1 |
Plinth level |
-
latitude : 23.32515764
Longitude : 86.59727796
file name : Image_16092021142331524.png
|
2021-09-16 14:23:31.634599 |
3 |
34285463 |
Installation of tubewell at Astatal Pucca rasta |
70000 |
Installation of tubewell at Astatal Pucca rasta1 |
Completion of work |
-
latitude : 23.32521266
Longitude : 86.59726741
file name : Image_13092021105415559.png
|
2021-09-13 10:54:15.660831 |
4 |
34250051 |
Installation of Tubewell at house of Badal Rajowar |
70000 |
Installation of Tubewell at house of Badal Rajowar1 |
Plinth level |
-
latitude : 23.32150664
Longitude : 86.6047488
file name : Image_16072021152415442.png
|
2021-07-16 15:24:15.542086 |
5 |
34250051 |
Installation of Tubewell at house of Badal Rajowar |
70000 |
Installation of Tubewell at house of Badal Rajowar1 |
Completion of work |
-
latitude : 23.32151335
Longitude : 86.60481438
file name : Image_14072021131745542.png
|
2021-07-14 13:17:45.639996 |
6 |
39114712 |
Three nos Tube well at Dholkata gram Sansad |
210000 |
Three nos Tube well at Dholkata gram Sansad1 |
Plinth level |
-
latitude : 23.38595651
Longitude : 86.60442911
file name : Image_21042022201213114.png
|
2022-04-21 20:12:13.215905 |
7 |
39114712 |
Three nos Tube well at Dholkata gram Sansad |
210000 |
Three nos Tube well at Dholkata gram Sansad1 |
Plinth level |
-
latitude : 23.38299254
Longitude : 86.6068257
file name : Image_20042022162901629.png
|
2022-04-20 16:29:01.740649 |
8 |
39114712 |
Three nos Tube well at Dholkata gram Sansad |
210000 |
Three nos Tube well at Dholkata gram Sansad1 |
Plinth level |
-
latitude : 23.38017377
Longitude : 86.60880197
file name : Image_07092021125823435.png
|
2021-09-07 12:58:23.541184 |
9 |
39114712 |
Three nos Tube well at Dholkata gram Sansad |
210000 |
Three nos Tube well at Dholkata gram Sansad1 |
Completion of work |
-
latitude : 23.38007876
Longitude : 86.60878368
file name : Image_22082021113852486.png
|
2021-08-22 11:38:52.592739 |
10 |
39114712 |
Three nos Tube well at Dholkata gram Sansad |
210000 |
Three nos Tube well at Dholkata gram Sansad1 |
Completion of work |
-
latitude : 23.38013959
Longitude : 86.60874467
file name : Image_10082021151229146.png
|
2021-08-10 15:12:29.233078 |
11 |
34240154 |
Installation of tubewell 2 nos at layekdih Village |
140000 |
Installation of tubewell 2 nos at layekdih Village1 |
Plinth level |
-
latitude : 23.33653675
Longitude : 86.57948054
file name : Image_07072022110641570.png
|
2022-07-07 11:06:41.658152 |
12 |
34240154 |
Installation of tubewell 2 nos at layekdih Village |
140000 |
Installation of tubewell 2 nos at layekdih Village1 |
Plinth level |
-
latitude : 23.33592504
Longitude : 86.57974099
file name : Image_16072021145508166.png
|
2021-07-16 14:55:08.283893 |
13 |
34240154 |
Installation of tubewell 2 nos at layekdih Village |
140000 |
Installation of tubewell 2 nos at layekdih Village1 |
Completion of work |
-
latitude : 23.33592896
Longitude : 86.57971703
file name : Image_14072021131734610.png
|
2021-07-14 13:17:34.70771 |
14 |
39114616 |
Three nos Tube well at khairipihira IV gram Sansad |
210000 |
Three nos Tube well at khairipihira IV gram Sansad1 |
Plinth level |
-
latitude : 23.37118103
Longitude : 86.57827357
file name : Image_21042022111749619.png
|
2022-04-21 11:17:49.718028 |
15 |
39114616 |
Three nos Tube well at khairipihira IV gram Sansad |
210000 |
Three nos Tube well at khairipihira IV gram Sansad1 |
Plinth level |
-
latitude : 23.37110051
Longitude : 86.57834315
file name : Image_21042022201201767.png
|
2022-04-21 20:12:01.938292 |
16 |
39114616 |
Three nos Tube well at khairipihira IV gram Sansad |
210000 |
Three nos Tube well at khairipihira IV gram Sansad1 |
Plinth level |
-
latitude : 23.36697546
Longitude : 86.58528513
file name : Image_07092021125815690.png
|
2021-09-07 12:58:15.798126 |
17 |
39114616 |
Three nos Tube well at khairipihira IV gram Sansad |
210000 |
Three nos Tube well at khairipihira IV gram Sansad1 |
Completion of work |
-
latitude : 23.36693633
Longitude : 86.58504548
file name : Image_10082021151222042.png
|
2021-08-10 15:12:22.143568 |
18 |
39114577 |
Four nos Tube well at Amghata Gram Sansad |
280000 |
Four nos Tube well at Amghata Gram Sansad1 |
Plinth level |
-
latitude : 23.34855089
Longitude : 86.58197538
file name : Image_11042022173428836.png
|
2022-04-11 17:34:28.944002 |
19 |
39114577 |
Four nos Tube well at Amghata Gram Sansad |
280000 |
Four nos Tube well at Amghata Gram Sansad1 |
Plinth level |
-
latitude : 23.3520611
Longitude : 86.58223721
file name : Image_16072021152403479.png
|
2021-07-16 15:24:03.580643 |
20 |
39114577 |
Four nos Tube well at Amghata Gram Sansad |
280000 |
Four nos Tube well at Amghata Gram Sansad1 |
Completion of work |
-
latitude : 23.35206916
Longitude : 86.58241591
file name : Image_14072021151821023.png
|
2021-07-14 15:18:21.130155 |
21 |
39114659 |
Four nos Tube well at Khairipihira V Gram Sansad |
280000 |
Four nos Tube well at Khairipihira V Gram Sansad1 |
Plinth level |
-
latitude : 23.37215622
Longitude : 86.59458821
file name : Image_21042022111743636.png
|
2022-04-21 11:17:43.745492 |
22 |
39114659 |
Four nos Tube well at Khairipihira V Gram Sansad |
280000 |
Four nos Tube well at Khairipihira V Gram Sansad1 |
Plinth level |
-
latitude : 23.37211408
Longitude : 86.5946548
file name : Image_21042022201205729.png
|
2022-04-21 20:12:05.831228 |
23 |
39114659 |
Four nos Tube well at Khairipihira V Gram Sansad |
280000 |
Four nos Tube well at Khairipihira V Gram Sansad1 |
Plinth level |
-
latitude : 23.37191851
Longitude : 86.59027325
file name : Image_07092021125819584.png
|
2021-09-07 12:58:19.693607 |
24 |
39114659 |
Four nos Tube well at Khairipihira V Gram Sansad |
280000 |
Four nos Tube well at Khairipihira V Gram Sansad1 |
Completion of work |
-
latitude : 23.37189797
Longitude : 86.59025295
file name : Image_10082021151225720.png
|
2021-08-10 15:12:25.832248 |
25 |
39114528 |
Three no Tube wellat Lakhanpur-I Gram sansad |
210000 |
Three no Tube wellat Lakhanpur-I Gram sansad1 |
Plinth level |
-
latitude : 23.34004907
Longitude : 86.57477546
file name : Image_25042022155906625.png
|
2022-04-25 15:59:06.746563 |
26 |
39114528 |
Three no Tube wellat Lakhanpur-I Gram sansad |
210000 |
Three no Tube wellat Lakhanpur-I Gram sansad1 |
Plinth level |
-
latitude : 23.34052399
Longitude : 86.57676939
file name : Image_25042022155857571.png
|
2022-04-25 15:58:57.688922 |
27 |
39114528 |
Three no Tube wellat Lakhanpur-I Gram sansad |
210000 |
Three no Tube wellat Lakhanpur-I Gram sansad1 |
Plinth level |
-
latitude : 23.34142732
Longitude : 86.57419074
file name : Image_16072021145512190.png
|
2021-07-16 14:55:12.2981 |
28 |
39114528 |
Three no Tube wellat Lakhanpur-I Gram sansad |
210000 |
Three no Tube wellat Lakhanpur-I Gram sansad1 |
Completion of work |
-
latitude : 23.34145702
Longitude : 86.57423353
file name : Image_14072021151809412.png
|
2021-07-14 15:18:09.514138 |
29 |
34245217 |
Installation of tubewell at Gramthan |
70000 |
Installation of tubewell at Gramthan1 |
Plinth level |
-
latitude : 23.34390065
Longitude : 86.58719271
file name : Image_16072021170710420.png
|
2021-07-16 17:07:10.505892 |
30 |
34245217 |
Installation of tubewell at Gramthan |
70000 |
Installation of tubewell at Gramthan1 |
Completion of work |
-
latitude : 23.34386947
Longitude : 86.58720706
file name : Image_14072021131741510.png
|
2021-07-14 13:17:41.609794 |
31 |
34802749 |
Construction of community Latrine at Thakur Bandh |
150000 |
Construction of community Latrine at Thakur Bandh1 |
Completion of work |
-
latitude : 23.34318537
Longitude : 86.57241374
file name : Image_22112021152149018.png
|
2021-11-22 15:21:49.075451 |
32 |
34794285 |
Construction ofPCC Road from House of Dharam Mahato house to Binod Mahato House |
240000 |
Construction ofPCC Road from House of Dharam Mahato house to Binod Mahato House1 |
Plinth level |
-
latitude : 23.34717121,23.3472971
Longitude : 86.59989004,86.59945198
file name : Image_04102021195942286.png
|
2021-10-04 19:59:42.398775 |
33 |
34794285 |
Construction ofPCC Road from House of Dharam Mahato house to Binod Mahato House |
240000 |
Construction ofPCC Road from House of Dharam Mahato house to Binod Mahato House1 |
Completion of work |
-
latitude : 23.34712059,23.34723666
Longitude : 86.59981559,86.59939779
file name : Image_16072021164523759.png
|
2021-07-16 16:45:23.863686 |
34 |
39114910 |
Construction of PCC road from Nandalal Mahato house to Baliahir |
200000 |
Construction of PCC road from Nandalal Mahato house to Baliahir1 |
Plinth level |
-
latitude : 23.34698438,23.3470682
Longitude : 86.60375452,86.60426093
file name : Image_04102021195945950.png
|
2021-10-04 19:59:46.067598 |
35 |
39114910 |
Construction of PCC road from Nandalal Mahato house to Baliahir |
200000 |
Construction of PCC road from Nandalal Mahato house to Baliahir1 |
Completion of work |
-
latitude : 23.34690883,23.34688934
Longitude : 86.60372286,86.60412631
file name : Image_16072021164550788.png
|
2021-07-16 16:45:50.889378 |
36 |
34764323 |
Construction of Community hall adjacent to Lakhanpur Gram Panchayat at Layekdih. |
444990 |
Construction of Community hall adjacent to Lakhanpur Gram Panchayat at Layekdih.1 |
Completion of work |
-
latitude : 23.33642503
Longitude : 86.58042367
file name : Image_14072021131730861.png
|
2021-07-14 13:17:30.966823 |
37 |
39114875 |
Construction of PCC road from Anil Mahato house to nandalal Mahato House |
250000 |
Construction of PCC road from Anil Mahato house to nandalal Mahato House1 |
Plinth level |
-
latitude : 23.34711018,23.34711913
Longitude : 86.60301583,86.60300629
file name : Image_18112021140418064.png
|
2021-11-18 14:04:18.161034 |
38 |
39114875 |
Construction of PCC road from Anil Mahato house to nandalal Mahato House |
250000 |
Construction of PCC road from Anil Mahato house to nandalal Mahato House1 |
Completion of work |
-
latitude : 23.34690467,23.34706602
Longitude : 86.60375919,86.60297999
file name : Image_16072021164532918.png
|
2021-07-16 16:45:33.024033 |
39 |
34268057 |
installation of tube well at jahir than |
70000 |
installation of tube well at jahir than1 |
Completion of work |
-
latitude : 23.33633751
Longitude : 86.59536994
file name : Image_04102021195938695.png
|
2021-10-04 19:59:38.807962 |
40 |
34787893 |
Construction of PCC FromRanjit Pal to Nadi BridgDholkata |
300000 |
Construction of PCC FromRanjit Pal to Nadi BridgDholkata1 |
Plinth level |
-
latitude : 23.38744902,23.38784207
Longitude : 86.60728173,86.6066859
file name : Image_22112021171751380.png
|
2021-11-22 17:17:51.423576 |
41 |
34787893 |
Construction of PCC FromRanjit Pal to Nadi BridgDholkata |
300000 |
Construction of PCC FromRanjit Pal to Nadi BridgDholkata1 |
Completion of work |
-
latitude : 23.38737608,23.38736601,23.38736662
Longitude : 86.60735492,86.60735523,86.6073568
file name : Image_22112021120539631.png
|
2021-11-22 12:05:39.719457 |
42 |
48423568 |
Installation of Tube well at Mahato Para |
70000 |
Installation of Tube well at Mahato Para 1 |
Plinth level |
-
latitude : 23.36591072
Longitude : 86.58801983
file name : Image_19052023105606295.png
|
2023-05-19 10:56:06.420689 |
43 |
48423568 |
Installation of Tube well at Mahato Para |
70000 |
Installation of Tube well at Mahato Para 1 |
Completion of work |
-
latitude : 23.3659084
Longitude : 86.58780767
file name : Image_19052023104123714.png
|
2023-05-19 10:41:23.843417 |
44 |
58717278 |
Construction Agayatal Protection wall at Kapatkata |
300000 |
Construction Agayatal Protection wall at Kapatkata1 |
Roof laid |
-
latitude : 23.35385994
Longitude : 86.57065767
file name : Image_05022024132132380.png
|
2024-02-05 13:21:32.450928 |
45 |
58717278 |
Construction Agayatal Protection wall at Kapatkata |
300000 |
Construction Agayatal Protection wall at Kapatkata1 |
Plinth level |
-
latitude : 23.35386513
Longitude : 86.57068615
file name : Image_05022024131351340.png
|
2024-02-05 13:13:51.43182 |
46 |
58717278 |
Construction Agayatal Protection wall at Kapatkata |
300000 |
Construction Agayatal Protection wall at Kapatkata1 |
Plinth level |
-
latitude : 23.3540715
Longitude : 86.57071441
file name : Image_27122023151841513.png
|
2023-12-27 15:18:41.588083 |
47 |
58717278 |
Construction Agayatal Protection wall at Kapatkata |
300000 |
Construction Agayatal Protection wall at Kapatkata1 |
Completion of work |
-
latitude : 23.35391474
Longitude : 86.57070337
file name : Image_27122023151316150.png
|
2023-12-27 15:13:16.22689 |
48 |
67783165 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 23.3538396
Longitude : 86.57040022
file name : Image_27122023152928731.png
|
2023-12-27 15:29:28.79816 |
49 |
67783165 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 23.35385132
Longitude : 86.57046607
file name : Image_27122023152556983.png
|
2023-12-27 15:25:57.069648 |
50 |
67783165 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.35386967
Longitude : 86.57041741
file name : Image_27122023152025413.png
|
2023-12-27 15:20:25.491871 |
51 |
39114749 |
Four nos Tube well at Madhuban Gram Sansad |
280000 |
Four nos Tube well at Madhuban Gram Sansad1 |
Plinth level |
-
latitude : 23.3227565
Longitude : 86.6014645
file name : Image_11042022174733448.png
|
2022-04-11 17:47:33.562705 |
52 |
39114749 |
Four nos Tube well at Madhuban Gram Sansad |
280000 |
Four nos Tube well at Madhuban Gram Sansad1 |
Completion of work |
-
latitude : 23.32286564
Longitude : 86.60147249
file name : Image_08042022111648999.png
|
2022-04-08 11:16:49.102824 |
53 |
67802920 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.34117067,23.34115408
Longitude : 86.57283112,86.57282888
file name : Image_27122023161817991.png
|
2023-12-27 16:18:18.064563 |
54 |
67802920 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.3406245,23.3406245
Longitude : 86.5728919,86.5728919
file name : Image_27122023161041582.png
|
2023-12-27 16:10:41.659533 |
55 |
67802920 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.3406676,23.3406665
Longitude : 86.5728827,86.5728833
file name : Image_27122023160641244.png
|
2023-12-27 16:06:41.320978 |
56 |
39114848 |
Three nos Tube well at Dholkata gram Sansad |
210000 |
Three nos Tube well at Dholkata gram Sansad1 |
Plinth level |
-
latitude : 23.38289129
Longitude : 86.6068579
file name : Image_21042022201216876.png
|
2022-04-21 20:12:16.979498 |
57 |
39114848 |
Three nos Tube well at Dholkata gram Sansad |
210000 |
Three nos Tube well at Dholkata gram Sansad1 |
Completion of work |
-
latitude : 23.38586588
Longitude : 86.60444045
file name : Image_20042022163128177.png
|
2022-04-20 16:31:28.339048 |
58 |
34800839 |
Installation of tube well at Simapathar near house of Ranjit Roy. |
70000 |
Installation of tube well at Simapathar near house of Ranjit Roy.1 |
Completion of work |
-
latitude : 23.37345477
Longitude : 86.59840166
file name : Image_21042022111736376.png
|
2022-04-21 11:17:36.47621 |
59 |
34800839 |
Installation of tube well at Simapathar near house of Ranjit Roy. |
70000 |
Installation of tube well at Simapathar near house of Ranjit Roy.1 |
Plinth level |
-
latitude : 23.37338573
Longitude : 86.59830071
file name : Image_21042022201209389.png
|
2022-04-21 20:12:09.514215 |
60 |
34369382 |
Installation of Tubewell Mursud at Madhuban |
70000 |
Installation of Tubewell Mursud at Madhuban1 |
Plinth level |
-
latitude : 23.32384899
Longitude : 86.60155596
file name : Image_25042022112154472.png
|
2022-04-25 11:21:54.595385 |
61 |
34369382 |
Installation of Tubewell Mursud at Madhuban |
70000 |
Installation of Tubewell Mursud at Madhuban1 |
Completion of work |
-
latitude : 23.3238782
Longitude : 86.60155504
file name : Image_21042022201232937.png
|
2022-04-21 20:12:33.038801 |
62 |
34371751 |
installation of tube well at house of radhanath at madhuban |
70000 |
installation of tube well at house of radhanath at madhuban1 |
Plinth level |
-
latitude : 23.32413308
Longitude : 86.59942263
file name : Image_25042022112207322.png
|
2022-04-25 11:22:07.434221 |
63 |
34371751 |
installation of tube well at house of radhanath at madhuban |
70000 |
installation of tube well at house of radhanath at madhuban1 |
Completion of work |
-
latitude : 23.3242962
Longitude : 86.59957786
file name : Image_21042022201221792.png
|
2022-04-21 20:12:21.903576 |
64 |
34376129 |
Installation of Tubewell at jortand kalimandir at madhuban |
70000 |
Installation of Tubewell at jortand kalimandir at madhuban1 |
Plinth level |
-
latitude : 23.32893146
Longitude : 86.59805589
file name : Image_25042022112201063.png
|
2022-04-25 11:22:01.209104 |
65 |
34376129 |
Installation of Tubewell at jortand kalimandir at madhuban |
70000 |
Installation of Tubewell at jortand kalimandir at madhuban1 |
Completion of work |
-
latitude : 23.32871882
Longitude : 86.59846285
file name : Image_21042022201225466.png
|
2022-04-21 20:12:25.576479 |
66 |
34289151 |
Installation of tubewell at Dukhu Mia at Madhuban |
70000 |
Installation of tubewell at Dukhu Mia at Madhuban1 |
Plinth level |
-
latitude : 23.32364861
Longitude : 86.60183591
file name : Image_25042022112145909.png
|
2022-04-25 11:21:46.045782 |
67 |
34289151 |
Installation of tubewell at Dukhu Mia at Madhuban |
70000 |
Installation of tubewell at Dukhu Mia at Madhuban1 |
Completion of work |
-
latitude : 23.32370877
Longitude : 86.60180093
file name : Image_21042022201229087.png
|
2022-04-21 20:12:29.231548 |
68 |
39114927 |
Two nos Tube well at Hurakeshabpur |
140000 |
Two nos Tube well at Hurakeshabpur 1 |
Plinth level |
-
latitude : 23.3469873
Longitude : 86.59958463
file name : Image_11052022130825069.png
|
2022-05-11 13:08:25.157269 |
69 |
39114927 |
Two nos Tube well at Hurakeshabpur |
140000 |
Two nos Tube well at Hurakeshabpur 1 |
Plinth level |
-
latitude : 23.34576106
Longitude : 86.59848448
file name : Image_25042022155911447.png
|
2022-04-25 15:59:11.564818 |
70 |
39114927 |
Two nos Tube well at Hurakeshabpur |
140000 |
Two nos Tube well at Hurakeshabpur 2 |
Plinth level |
-
latitude : 23.34780039
Longitude : 86.60555847
file name : Image_11052022130821098.png
|
2022-05-11 13:08:21.182904 |
71 |
39114927 |
Two nos Tube well at Hurakeshabpur |
140000 |
Two nos Tube well at Hurakeshabpur 2 |
Plinth level |
-
latitude : 23.34726542
Longitude : 86.60559899
file name : Image_25042022155916265.png
|
2022-04-25 15:59:16.374077 |
72 |
39114693 |
Construction of Drain from Ghaltu Roy Bashjhur to sayer Bandh |
299990 |
Construction of Drain from Ghaltu Roy Bashjhur to sayer Bandh1 |
Plinth level |
-
latitude : 23.37239316,23.37239912
Longitude : 86.59061755,86.59059734
file name : Image_26052022190834366.png
|
2022-05-26 19:08:34.475902 |
73 |
39114693 |
Construction of Drain from Ghaltu Roy Bashjhur to sayer Bandh |
299990 |
Construction of Drain from Ghaltu Roy Bashjhur to sayer Bandh1 |
Completion of work |
-
latitude : 23.372452,23.37249205
Longitude : 86.58996993,86.59073937
file name : Image_04102021195949645.png
|
2021-10-04 19:59:49.77083 |
74 |
34790972 |
Construction ofPCC Road from Buchan Mahato House to Culvert |
100000 |
Construction ofPCC Road from Buchan Mahato House to Culvert1 |
Plinth level |
-
latitude : 23.35740418,23.35739635
Longitude : 86.59531409,86.59532374
file name : Image_12052022164946669.png
|
2022-05-12 16:49:46.780466 |
75 |
34790972 |
Construction ofPCC Road from Buchan Mahato House to Culvert |
100000 |
Construction ofPCC Road from Buchan Mahato House to Culvert1 |
Completion of work |
-
latitude : 23.35746571,23.3574187
Longitude : 86.59532082,86.5953021
file name : Image_12052022073310914.png
|
2022-05-12 07:33:11.045927 |
76 |
34780573 |
Construction of Shed at Panchananthan of Lakhanpur -II |
210000 |
Construction of Shed at Panchananthan of Lakhanpur -II 1 |
Plinth level |
-
latitude : 23.33809191
Longitude : 86.57714337
file name : Image_15052022085044008.png
|
2022-05-15 08:50:44.140135 |
77 |
34789568 |
Construction ofPCC Road from Deoli Harimandir to Rangadih Pitch Rasta |
500000 |
Construction ofPCC Road from Deoli Harimandir to Rangadih Pitch Rasta1 |
Completion of work |
-
latitude : 23.35653097,23.35642109
Longitude : 86.60212359,86.60206494
file name : Image_15052022085039410.png
|
2022-05-15 08:50:39.534945 |
78 |
34789568 |
Construction ofPCC Road from Deoli Harimandir to Rangadih Pitch Rasta |
500000 |
Construction ofPCC Road from Deoli Harimandir to Rangadih Pitch Rasta1 |
Plinth level |
-
latitude : 23.35585002,23.35584905
Longitude : 86.6023363,86.60233515
file name : Image_26052022190820485.png
|
2022-05-26 19:08:20.579556 |
79 |
39114499 |
Seven no Solar light at lakhanpur-II Gram sansad |
210000 |
Seven no Solar light at lakhanpur-II Gram sansad1 |
Plinth level |
-
latitude : 23.34145766
Longitude : 86.57150711
file name : Image_17062022164651472.png
|
2022-06-17 16:46:51.595856 |
80 |
39114499 |
Seven no Solar light at lakhanpur-II Gram sansad |
210000 |
Seven no Solar light at lakhanpur-II Gram sansad1 |
Completion of work |
-
latitude : 23.3434804
Longitude : 86.57299981
file name : Image_15062022071955660.png
|
2022-06-15 07:19:55.864132 |
81 |
88835017 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.37230831
Longitude : 86.59132495
file name : Image_06042024083248009.png
|
2024-04-06 08:32:48.104104 |
82 |
88835017 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.37231174
Longitude : 86.59132284
file name : Image_06042024082744148.png
|
2024-04-06 08:27:44.232173 |
83 |
88835017 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.37230197
Longitude : 86.5913312
file name : Image_06042024082600018.png
|
2024-04-06 08:26:00.111416 |
84 |
88835017 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.3724148
Longitude : 86.59109433
file name : Image_06042024081724896.png
|
2024-04-06 08:17:24.982669 |
85 |
34149431 |
Construction of Community latrine at palma sayer |
200000 |
Construction of Community latrine at palma sayer1 |
Plinth level |
-
latitude : 23.34062643
Longitude : 86.58841936
file name : Image_07072022110627290.png
|
2022-07-07 11:06:27.367399 |
86 |
34149431 |
Construction of Community latrine at palma sayer |
200000 |
Construction of Community latrine at palma sayer1 |
Completion of work |
-
latitude : 23.34071487
Longitude : 86.58842385
file name : Image_21062022072707461.png
|
2022-06-21 07:27:07.566011 |
87 |
48437768 |
Construction of PCC road from Pitch Road to Ranjit Gope house Lakhanpur-VIII |
300000 |
Construction of PCC road from Pitch Road to Ranjit Gope house Lakhanpur-VIII1 |
Plinth level |
-
latitude : 23.32581034,23.32583385
Longitude : 86.59853007,86.59855747
file name : Image_09072022082632932.png
|
2022-07-09 08:26:33.014736 |
88 |
48437768 |
Construction of PCC road from Pitch Road to Ranjit Gope house Lakhanpur-VIII |
300000 |
Construction of PCC road from Pitch Road to Ranjit Gope house Lakhanpur-VIII1 |
Completion of work |
-
latitude : 23.32582532,23.32583942
Longitude : 86.59893149,86.59894343
file name : Image_07072022180953410.png
|
2022-07-07 18:09:53.48484 |
89 |
48434643 |
Construction of Drain with Guard Wall of Hazari Gope Happa |
300000 |
Construction of Drain with Guard Wall of Hazari Gope Happa1 |
Plinth level |
-
latitude : 23.32581839,23.32585348
Longitude : 86.59884897,86.59898043
file name : Image_09072022082636412.png
|
2022-07-09 08:26:36.489624 |
90 |
48434643 |
Construction of Drain with Guard Wall of Hazari Gope Happa |
300000 |
Construction of Drain with Guard Wall of Hazari Gope Happa1 |
Completion of work |
-
latitude : 23.32582917,23.32584482
Longitude : 86.59892876,86.5989506
file name : Image_07072022180948582.png
|
2022-07-07 18:09:48.676327 |
91 |
48432862 |
Installatgion of four nos of Tube well at Lakhanpur-VII Gram Sansad |
280000 |
Installatgion of four nos of Tube well at Lakhanpur-VII Gram Sansad1 |
Plinth level |
-
latitude : 23.35317771
Longitude : 86.60357186
file name : Image_19092022194254453.png
|
2022-09-19 19:42:54.510494 |
92 |
48432862 |
Installatgion of four nos of Tube well at Lakhanpur-VII Gram Sansad |
280000 |
Installatgion of four nos of Tube well at Lakhanpur-VII Gram Sansad1 |
Completion of work |
-
latitude : 23.35313675
Longitude : 86.60353719
file name : Image_12092022145011460.png
|
2022-09-12 14:50:11.551338 |
93 |
48432862 |
Installatgion of four nos of Tube well at Lakhanpur-VII Gram Sansad |
280000 |
Installatgion of four nos of Tube well at Lakhanpur-VII Gram Sansad2 |
Plinth level |
-
latitude : 23.35972777
Longitude : 86.60091363
file name : Image_19092022194257577.png
|
2022-09-19 19:42:57.630884 |
94 |
48432862 |
Installatgion of four nos of Tube well at Lakhanpur-VII Gram Sansad |
280000 |
Installatgion of four nos of Tube well at Lakhanpur-VII Gram Sansad2 |
Completion of work |
-
latitude : 23.3597937
Longitude : 86.60079719
file name : Image_12092022145015453.png
|
2022-09-12 14:50:15.542894 |
95 |
48432862 |
Installatgion of four nos of Tube well at Lakhanpur-VII Gram Sansad |
280000 |
Installatgion of four nos of Tube well at Lakhanpur-VII Gram Sansad3 |
Plinth level |
-
latitude : 23.3576887
Longitude : 86.59650879
file name : Image_19092022194300580.png
|
2022-09-19 19:43:00.632243 |
96 |
48432862 |
Installatgion of four nos of Tube well at Lakhanpur-VII Gram Sansad |
280000 |
Installatgion of four nos of Tube well at Lakhanpur-VII Gram Sansad3 |
Completion of work |
-
latitude : 23.35775476
Longitude : 86.59649769
file name : Image_12092022145019210.png
|
2022-09-12 14:50:19.299351 |
97 |
48432862 |
Installatgion of four nos of Tube well at Lakhanpur-VII Gram Sansad |
280000 |
Installatgion of four nos of Tube well at Lakhanpur-VII Gram Sansad4 |
Plinth level |
-
latitude : 23.35511599
Longitude : 86.59675471
file name : Image_19092022194303640.png
|
2022-09-19 19:43:03.696716 |
98 |
48432862 |
Installatgion of four nos of Tube well at Lakhanpur-VII Gram Sansad |
280000 |
Installatgion of four nos of Tube well at Lakhanpur-VII Gram Sansad4 |
Completion of work |
-
latitude : 23.35488607
Longitude : 86.59690065
file name : Image_12092022145022772.png
|
2022-09-12 14:50:22.859638 |
99 |
48432955 |
Installation of two nos Tube well aty Lakhanpur IX Gram Sansad |
140000 |
Installation of two nos Tube well aty Lakhanpur IX Gram Sansad1 |
Plinth level |
-
latitude : 23.34389905
Longitude : 86.5965215
file name : Image_19092022194248308.png
|
2022-09-19 19:42:48.366083 |
100 |
48432955 |
Installation of two nos Tube well aty Lakhanpur IX Gram Sansad |
140000 |
Installation of two nos Tube well aty Lakhanpur IX Gram Sansad1 |
Completion of work |
-
latitude : 23.34380271
Longitude : 86.59654438
file name : Image_12092022145004074.png
|
2022-09-12 14:50:04.162215 |
101 |
48432955 |
Installation of two nos Tube well aty Lakhanpur IX Gram Sansad |
140000 |
Installation of two nos Tube well aty Lakhanpur IX Gram Sansad2 |
Plinth level |
-
latitude : 23.34677953
Longitude : 86.60740104
file name : Image_19092022194251335.png
|
2022-09-19 19:42:51.387756 |
102 |
48432955 |
Installation of two nos Tube well aty Lakhanpur IX Gram Sansad |
140000 |
Installation of two nos Tube well aty Lakhanpur IX Gram Sansad2 |
Completion of work |
-
latitude : 23.34669917
Longitude : 86.60757212
file name : Image_12092022145007406.png
|
2022-09-12 14:50:07.492188 |
103 |
48435064 |
Installation of Tube well at Palma Bouri Shmashan |
70000 |
Installation of Tube well at Palma Bouri Shmashan1 |
Plinth level |
-
latitude : 23.34766373
Longitude : 86.58830965
file name : Image_19092022194306659.png
|
2022-09-19 19:43:06.716051 |
104 |
48435064 |
Installation of Tube well at Palma Bouri Shmashan |
70000 |
Installation of Tube well at Palma Bouri Shmashan1 |
Completion of work |
-
latitude : 23.3476579
Longitude : 86.58831955
file name : Image_12092022145000338.png
|
2022-09-12 14:50:00.433908 |
105 |
48436928 |
Construction of PCC road from Azad Ansary house to Hospital Lakhanpur-IV |
300000 |
Construction of PCC road from Azad Ansary house to Hospital Lakhanpur-IV1 |
Plinth level |
-
latitude : 23.36761087,23.36768182
Longitude : 86.58451412,86.58457187
file name : Image_21092022145032429.png
|
2022-09-21 14:50:32.482251 |
106 |
48436928 |
Construction of PCC road from Azad Ansary house to Hospital Lakhanpur-IV |
300000 |
Construction of PCC road from Azad Ansary house to Hospital Lakhanpur-IV1 |
Completion of work |
-
latitude : 23.36769292,23.367693
Longitude : 86.58453797,86.58456197
file name : Image_21092022112841692.png
|
2022-09-21 11:28:41.765615 |
107 |
48434214 |
Construction of Soakpit at Nichmore Urinal |
30000 |
Construction of Soakpit at Nichmore Urinal1 |
Completion of work |
-
latitude : 23.37236764
Longitude : 86.59186159
file name : Image_20092022133243213.png
|
2022-09-20 13:32:43.293481 |
108 |
48434214 |
Construction of Soakpit at Nichmore Urinal |
30000 |
Construction of Soakpit at Nichmore Urinal1 |
Plinth level |
-
latitude : 23.3723458
Longitude : 86.5917912
file name : Image_21092022145036080.png
|
2022-09-21 14:50:36.135615 |
109 |
48434214 |
Construction of Soakpit at Nichmore Urinal |
30000 |
Construction of Soakpit at Nichmore Urinal1 |
Completion of work |
-
latitude : 23.37248459
Longitude : 86.59188874
file name : Image_20092022133250292.png
|
2022-09-20 13:32:50.364789 |
110 |
48434214 |
Construction of Soakpit at Nichmore Urinal |
30000 |
Construction of Soakpit at Nichmore Urinal1 |
Completion of work |
-
latitude : 23.37248459
Longitude : 86.59188874
file name : Image_20092022133311439.png
|
2022-09-20 13:33:11.517525 |
111 |
48434526 |
Construction of Soakpit with chatal Drain near Shiva Mandir |
100000 |
Construction of Soakpit with chatal Drain near Shiva Mandir 1 |
Completion of work |
-
latitude : 23.37226213,23.37225235
Longitude : 86.59116758,86.59115908
file name : Image_13102022134634683.png
|
2022-10-13 13:46:34.777289 |
112 |
48437173 |
Construction of PCC road from Sagar Karmakar house to Bijay Mandi house Lakhanpur-VI |
300000 |
Construction of PCC road from Sagar Karmakar house to Bijay Mandi house Lakhanpur-VI1 |
Completion of work |
-
latitude : 23.38341744,23.38340378
Longitude : 86.60877548,86.60878753
file name : Image_13102022134630763.png
|
2022-10-13 13:46:30.869834 |
113 |
48434386 |
Construction of Culvert at Namobandh |
100000 |
Construction of Culvert at Namobandh 1 |
Completion of work |
-
latitude : 23.3789653,23.37899589
Longitude : 86.59454439,86.59455278
file name : Image_02112022153527777.png
|
2022-11-02 15:35:27.915733 |
114 |
48422925 |
Four No of tube well at Lakhanpur-I Gram Sansad |
280000 |
Four No of tube well at Lakhanpur-I Gram Sansad1 |
Completion of work |
-
latitude : 23.34156122
Longitude : 86.5776846
file name : Image_02112022152807780.png
|
2022-11-02 15:28:07.961377 |
115 |
48436781 |
Installation of Goalpost at Amaghata football Ground |
25000 |
Installation of Goalpost at Amaghata football Ground1 |
Completion of work |
-
latitude : 23.35016156,23.35014179
Longitude : 86.57175297,86.57179837
file name : Image_05122022110540816.png
|
2022-12-05 11:05:40.949634 |
116 |
48437983 |
Construction of PCC road from Nonigopal Mahato house to Gram than Lakhanpur-IX |
150000 |
Construction of PCC road from Nonigopal Mahato house to Gram than Lakhanpur-IX1 |
Completion of work |
-
latitude : 23.34648231,23.3464891
Longitude : 86.5989593,86.59895297
file name : Image_20122022113350699.png
|
2022-12-20 11:33:50.834891 |
117 |
34783912 |
Boundary wall of Kabbarsthan at Khairipihira with ro0m and tube well Khairipihira |
200000 |
Boundary wall of Kabbarsthan at Khairipihira with ro0m and tube well Khairipihira1 |
Plinth level |
-
latitude : 23.36447706
Longitude : 86.57406716
file name : Image_02052023130119104.png
|
2023-05-02 13:01:19.275826 |
118 |
34783912 |
Boundary wall of Kabbarsthan at Khairipihira with ro0m and tube well Khairipihira |
200000 |
Boundary wall of Kabbarsthan at Khairipihira with ro0m and tube well Khairipihira1 |
Completion of work |
-
latitude : 23.36455654
Longitude : 86.57400711
file name : Image_24012023122310416.png
|
2023-01-24 12:23:10.547542 |
119 |
67789407 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 23.34143535
Longitude : 86.57650107
file name : Image_28062024120819749.png
|
2024-06-28 12:08:19.841557 |
120 |
67789407 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 23.33517972
Longitude : 86.58279645
file name : Image_27062024141617579.png
|
2024-06-27 14:16:17.695578 |
121 |
67789407 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.33497708
Longitude : 86.58265609
file name : Image_18062024134753299.png
|
2024-06-18 13:47:53.416867 |
122 |
48432522 |
Installation of Tube well at Lakhanpur V Gram Sansad |
70000 |
Installation of Tube well at Lakhanpur V Gram Sansad1 |
Plinth level |
-
latitude : 23.37667084
Longitude : 86.60376839
file name : Image_24052023162402782.png
|
2023-05-24 16:24:02.915003 |
123 |
48432522 |
Installation of Tube well at Lakhanpur V Gram Sansad |
70000 |
Installation of Tube well at Lakhanpur V Gram Sansad1 |
Completion of work |
-
latitude : 23.37668647
Longitude : 86.60379393
file name : Image_24052023105008144.png
|
2023-05-24 10:50:08.267737 |
124 |
58727763 |
Construction PCC Road From Bedia Colony Sadhhur House to Siraz Ansary House |
210000 |
Construction PCC Road From Bedia Colony Sadhhur House to Siraz Ansary House1 |
Plinth level |
-
latitude : 23.37292137,23.37297163
Longitude : 86.5845086,86.58448867
file name : Image_24052023162416067.png
|
2023-05-24 16:24:16.198558 |
125 |
58727763 |
Construction PCC Road From Bedia Colony Sadhhur House to Siraz Ansary House |
210000 |
Construction PCC Road From Bedia Colony Sadhhur House to Siraz Ansary House1 |
Completion of work |
-
latitude : 23.37298549,23.3729855
Longitude : 86.58448934,86.58448927
file name : Image_24052023105836217.png
|
2023-05-24 10:58:36.375219 |
126 |
67868699 |
Construction of roads |
120000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.35479984,23.35480059
Longitude : 86.61181642,86.61181713
file name : Image_08042024140925833.png
|
2024-04-08 14:09:25.965393 |
127 |
67868699 |
Construction of roads |
120000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.35475369,23.35475368
Longitude : 86.61188839,86.61188841
file name : Image_08042024140217227.png
|
2024-04-08 14:02:17.337314 |
128 |
67868699 |
Construction of roads |
120000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.35475486,23.3547469
Longitude : 86.61190783,86.61191008
file name : Image_08042024135113540.png
|
2024-04-08 13:51:13.701305 |
129 |
34781839 |
Construction of PCC Road from house of Amulya Roy to Ambuj Roy house.Satkalla |
300000 |
Construction of PCC Road from house of Amulya Roy to Ambuj Roy house.Satkalla1 |
Plinth level |
-
latitude : 23.35343641,23.35346422
Longitude : 86.58447144,86.58445195
file name : Image_03052023155540789.png
|
2023-05-03 15:55:40.908915 |
130 |
34781839 |
Construction of PCC Road from house of Amulya Roy to Ambuj Roy house.Satkalla |
300000 |
Construction of PCC Road from house of Amulya Roy to Ambuj Roy house.Satkalla1 |
Plinth level |
-
latitude : 23.35346081,23.35346085
Longitude : 86.58444188,86.58444153
file name : Image_03052023155545375.png
|
2023-05-03 15:55:45.531562 |
131 |
34781839 |
Construction of PCC Road from house of Amulya Roy to Ambuj Roy house.Satkalla |
300000 |
Construction of PCC Road from house of Amulya Roy to Ambuj Roy house.Satkalla1 |
Completion of work |
-
latitude : 23.33611713,23.35371486
Longitude : 86.58002608,86.58479553
file name : Image_02052023145810876.png
|
2023-05-02 14:58:11.00942 |
132 |
48437069 |
Construction of PCC road from Tamal tal to Shiava Mandir Lakhanpur-V |
300000 |
Construction of PCC road from Tamal tal to Shiava Mandir Lakhanpur-V1 |
Plinth level |
-
latitude : 23.37200094,23.37200106
Longitude : 86.59070162,86.59069636
file name : Image_15052023121556881.png
|
2023-05-15 12:15:57.017283 |
133 |
48437069 |
Construction of PCC road from Tamal tal to Shiava Mandir Lakhanpur-V |
300000 |
Construction of PCC road from Tamal tal to Shiava Mandir Lakhanpur-V1 |
Completion of work |
-
latitude : 23.37189088,23.37191823
Longitude : 86.59008193,86.59023761
file name : Image_11052023121808099.png
|
2023-05-11 12:18:08.231116 |
134 |
58727701 |
Construction of PCC Road from Hospital Boundary to Sanatan Modak Shop |
300000 |
Construction of PCC Road from Hospital Boundary to Sanatan Modak Shop1 |
Plinth level |
-
latitude : 23.36882061,23.36881323
Longitude : 86.58487149,86.58488192
file name : Image_15052023121600511.png
|
2023-05-15 12:16:00.635119 |
135 |
58727701 |
Construction of PCC Road from Hospital Boundary to Sanatan Modak Shop |
300000 |
Construction of PCC Road from Hospital Boundary to Sanatan Modak Shop1 |
Completion of work |
-
latitude : 23.36877809,23.36877253
Longitude : 86.58489638,86.58488123
file name : Image_11052023121804736.png
|
2023-05-11 12:18:04.879278 |
136 |
58727948 |
Construction of Manasamela Chatal with Suridova protection wall |
150000 |
Construction of Manasamela Chatal with Suridova protection wall1 |
Plinth level |
-
latitude : 23.32493049
Longitude : 86.60036089
file name : Image_10052023110745444.png
|
2023-05-10 11:07:45.571133 |
137 |
58727948 |
Construction of Manasamela Chatal with Suridova protection wall |
150000 |
Construction of Manasamela Chatal with Suridova protection wall1 |
Completion of work |
-
latitude : 23.32482879
Longitude : 86.6003346
file name : Image_08052023121252132.png
|
2023-05-08 12:12:52.289553 |
138 |
48437921 |
Construction of PCC road from Majhi Than to Subhas Mahato House Lakhanpur-IX |
150000 |
Construction of PCC road from Majhi Than to Subhas Mahato House Lakhanpur-IX1 |
Plinth level |
-
latitude : 23.34812555,23.34812991
Longitude : 86.60573849,86.60582975
file name : Image_10052023114301046.png
|
2023-05-10 11:43:01.181296 |
139 |
48437921 |
Construction of PCC road from Majhi Than to Subhas Mahato House Lakhanpur-IX |
150000 |
Construction of PCC road from Majhi Than to Subhas Mahato House Lakhanpur-IX1 |
Completion of work |
-
latitude : 23.34794601,23.34800055
Longitude : 86.60584652,86.60582847
file name : Image_08052023121112580.png
|
2023-05-08 12:11:12.718982 |
140 |
58716341 |
Construction of PCC Road from Manik Gorain house to sbhas Gorain House |
180000 |
Construction of PCC Road from Manik Gorain house to sbhas Gorain House1 |
Plinth level |
-
latitude : 23.34262071,23.34262824
Longitude : 86.5722137,86.57229289
file name : Image_10052023150632547.png
|
2023-05-10 15:06:32.678529 |
141 |
58716341 |
Construction of PCC Road from Manik Gorain house to sbhas Gorain House |
180000 |
Construction of PCC Road from Manik Gorain house to sbhas Gorain House1 |
Completion of work |
-
latitude : 23.34272985,23.34268769
Longitude : 86.57216374,86.57234744
file name : Image_08052023145103689.png
|
2023-05-08 14:51:03.821008 |
142 |
58727892 |
Construction of PCC Road from Abtar Roy house to Ajit Roy House |
150000 |
Construction of PCC Road from Abtar Roy house to Ajit Roy House1 |
Plinth level |
-
latitude : 23.36161734,23.36161661
Longitude : 86.60140617,86.60140623
file name : Image_16052023162954917.png
|
2023-05-16 16:29:55.049407 |
143 |
58727892 |
Construction of PCC Road from Abtar Roy house to Ajit Roy House |
150000 |
Construction of PCC Road from Abtar Roy house to Ajit Roy House1 |
Completion of work |
-
latitude : 23.36160452,23.36160502
Longitude : 86.60141576,86.6014183
file name : Image_15052023121603973.png
|
2023-05-15 12:16:04.119305 |
144 |
48435818 |
Construction of PCC Road Shiva Mandir Mela area at Lakhanpur-Lakhanpur-I |
200000 |
Construction of PCC Road Shiva Mandir Mela area at Lakhanpur-Lakhanpur-I1 |
Plinth level |
-
latitude : 23.34384175,23.34383012
Longitude : 86.57503004,86.57505602
file name : Image_17052023141756793.png
|
2023-05-17 14:17:56.936622 |
145 |
48435818 |
Construction of PCC Road Shiva Mandir Mela area at Lakhanpur-Lakhanpur-I |
200000 |
Construction of PCC Road Shiva Mandir Mela area at Lakhanpur-Lakhanpur-I1 |
Completion of work |
-
latitude : 23.3426802,23.3426802
Longitude : 86.5754553,86.5754553
file name : Image_17052023111039321.png
|
2023-05-17 11:10:39.468169 |
146 |
48423327 |
Installation of Tube well near Kalipada Lohar House |
70000 |
Installation of Tube well near Kalipada Lohar House1 |
Plinth level |
-
latitude : 23.36983359
Longitude : 86.58242908
file name : Image_17052023170659853.png
|
2023-05-17 17:06:59.976567 |
147 |
48423327 |
Installation of Tube well near Kalipada Lohar House |
70000 |
Installation of Tube well near Kalipada Lohar House1 |
Completion of work |
-
latitude : 23.36961362
Longitude : 86.58259646
file name : Image_17052023141802077.png
|
2023-05-17 14:18:02.278382 |
148 |
48432261 |
Installation of Tube well near Akash Paramanik House Khairipihira |
70000 |
Installation of Tube well near Akash Paramanik House Khairipihira1 |
Plinth level |
-
latitude : 23.36571939
Longitude : 86.58576228
file name : Image_17052023170707987.png
|
2023-05-17 17:07:08.107064 |
149 |
48432261 |
Installation of Tube well near Akash Paramanik House Khairipihira |
70000 |
Installation of Tube well near Akash Paramanik House Khairipihira1 |
Completion of work |
-
latitude : 23.36576731
Longitude : 86.58581495
file name : Image_17052023141807834.png
|
2023-05-17 14:18:07.969253 |
150 |
58837067 |
Installation of Tube well at Gharer Pase |
80000 |
Installation of Tube well at Gharer Pase1 |
Plinth level |
-
latitude : 23.35493029
Longitude : 86.6027148
file name : Image_18052023103748958.png
|
2023-05-18 10:37:49.100931 |
151 |
58837067 |
Installation of Tube well at Gharer Pase |
80000 |
Installation of Tube well at Gharer Pase1 |
Completion of work |
-
latitude : 23.35482676
Longitude : 86.60279287
file name : Image_17052023170653912.png
|
2023-05-17 17:06:54.029888 |
152 |
58839933 |
Installation of Tube well at Bahandih |
80000 |
Installation of Tube well at Bahandih1 |
Plinth level |
-
latitude : 23.34155093
Longitude : 86.59664014
file name : Image_18052023103752671.png
|
2023-05-18 10:37:52.916094 |
153 |
58839933 |
Installation of Tube well at Bahandih |
80000 |
Installation of Tube well at Bahandih1 |
Completion of work |
-
latitude : 23.34144277
Longitude : 86.59653224
file name : Image_17052023170649229.png
|
2023-05-17 17:06:49.349844 |
154 |
48437536 |
Constructiuon of PCC road from Tapan Mahato house to Sripati Mahato house Lakhanpur-VII |
150000 |
Constructiuon of PCC road from Tapan Mahato house to Sripati Mahato house Lakhanpur-VII1 |
Plinth level |
-
latitude : 23.35539716,23.355397
Longitude : 86.59663256,86.5966327
file name : Image_02062023132803961.png
|
2023-06-02 13:28:04.081981 |
155 |
48437536 |
Constructiuon of PCC road from Tapan Mahato house to Sripati Mahato house Lakhanpur-VII |
150000 |
Constructiuon of PCC road from Tapan Mahato house to Sripati Mahato house Lakhanpur-VII1 |
Completion of work |
-
latitude : 23.35539499,23.35539657
Longitude : 86.5966479,86.59664676
file name : Image_01062023140143175.png
|
2023-06-01 14:01:43.334402 |
156 |
48436153 |
Construction of PCC road at Thakurbandh baid Lakhanpur-II |
100000 |
Construction of PCC road at Thakurbandh baid Lakhanpur-II1 |
Plinth level |
-
latitude : 23.34304623,23.34304495
Longitude : 86.57265747,86.57265389
file name : Image_15062023122322911.png
|
2023-06-15 12:23:23.035952 |
157 |
48436153 |
Construction of PCC road at Thakurbandh baid Lakhanpur-II |
100000 |
Construction of PCC road at Thakurbandh baid Lakhanpur-II1 |
Completion of work |
-
latitude : 23.34305809,23.34305984
Longitude : 86.57259516,86.57258784
file name : Image_06062023155511581.png
|
2023-06-06 15:55:11.705272 |
158 |
48434002 |
Construction of Bathing Ghat at Kapatkata Chowlibandh |
230000 |
Construction of Bathing Ghat at Kapatkata Chowlibandh1 |
Plinth level |
-
latitude : 23.3537614
Longitude : 86.57505344
file name : Image_15062023161157940.png
|
2023-06-15 16:11:58.193087 |
159 |
48434002 |
Construction of Bathing Ghat at Kapatkata Chowlibandh |
230000 |
Construction of Bathing Ghat at Kapatkata Chowlibandh1 |
Completion of work |
-
latitude : 23.35342745
Longitude : 86.57488323
file name : Image_15062023122629484.png
|
2023-06-15 12:26:29.601895 |
160 |
48434002 |
Construction of Bathing Ghat at Kapatkata Chowlibandh |
230000 |
Construction of Bathing Ghat at Kapatkata Chowlibandh1 |
Completion of work |
-
latitude : 23.35347062
Longitude : 86.57454853
file name : Image_15062023123632922.png
|
2023-06-15 12:36:33.040708 |
161 |
107098739 |
Construction and Maintenance of Community Centre |
200000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 23.34573929
Longitude : 86.57597727
file name : Image_06092024115226459.png
|
2024-09-06 11:53:11.178481 |
162 |
107098739 |
Construction and Maintenance of Community Centre |
200000 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 23.3459009
Longitude : 86.57596291
file name : Image_06092024120428715.png
|
2024-09-06 12:05:13.594832 |
163 |
107098739 |
Construction and Maintenance of Community Centre |
200000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 23.34591745
Longitude : 86.57599215
file name : Image_06092024120002561.png
|
2024-09-06 12:00:47.384382 |
164 |
58727973 |
Construction of PCC Road from Ranjit Mahato Shop to Kartik Mahato house |
300000 |
Construction of PCC Road from Ranjit Mahato Shop to Kartik Mahato house1 |
Roof laid |
-
latitude : 23.34402859,23.34402863
Longitude : 86.59660717,86.59660066
file name : Image_06012024095154626.png
|
2024-01-06 09:51:54.697668 |
165 |
58727973 |
Construction of PCC Road from Ranjit Mahato Shop to Kartik Mahato house |
300000 |
Construction of PCC Road from Ranjit Mahato Shop to Kartik Mahato house1 |
Plinth level |
-
latitude : 23.34420962,23.34421362
Longitude : 86.59673544,86.59674184
file name : Image_06012024093411492.png
|
2024-01-06 09:34:11.569011 |
166 |
58727973 |
Construction of PCC Road from Ranjit Mahato Shop to Kartik Mahato house |
300000 |
Construction of PCC Road from Ranjit Mahato Shop to Kartik Mahato house1 |
Completion of work |
-
latitude : 23.34430059,23.34457601,23.34455314
Longitude : 86.59674067,86.59686878,86.59688267
file name : Image_06012024092528485.png
|
2024-01-06 09:25:28.544254 |
167 |
67868904 |
Construction of roads |
120000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.32873446,23.32873219
Longitude : 86.59839552,86.5984176
file name : Image_03012024161409186.png
|
2024-01-03 16:14:09.252621 |
168 |
67868904 |
Construction of roads |
120000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.32876531,23.32876531
Longitude : 86.59841195,86.59841195
file name : Image_03012024160836372.png
|
2024-01-03 16:08:36.442282 |
169 |
67868904 |
Construction of roads |
120000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.32871575,23.32869562
Longitude : 86.5983886,86.59839535
file name : Image_03012024160337145.png
|
2024-01-03 16:03:37.230151 |
170 |
67798243 |
Procurement of Waste Disposal Units |
245099 |
Procurement of Waste Disposal Units1 |
Roof laid |
-
latitude : 23.3369758
Longitude : 86.5801123
file name : Image_21012024102827349.png
|
2024-01-21 10:28:27.421102 |
171 |
67798243 |
Procurement of Waste Disposal Units |
245099 |
Procurement of Waste Disposal Units1 |
Roof laid |
-
latitude : 23.3366012
Longitude : 86.5806287
file name : Image_21012024102345495.png
|
2024-01-21 10:23:45.563612 |
172 |
67798243 |
Procurement of Waste Disposal Units |
245099 |
Procurement of Waste Disposal Units1 |
Plinth level |
-
latitude : 23.33682704
Longitude : 86.58038874
file name : Image_21012024101724057.png
|
2024-01-21 10:17:24.122035 |
173 |
67798243 |
Procurement of Waste Disposal Units |
245099 |
Procurement of Waste Disposal Units1 |
Completion of work |
-
latitude : 23.33686029
Longitude : 86.58036617
file name : Image_21012024101326952.png
|
2024-01-21 10:13:27.022187 |
174 |
58728198 |
Installation Tubewell at Bhalur Danga Lakhanpur II Sansad |
80000 |
Installation Tubewell at Bhalur Danga Lakhanpur II Sansad1 |
Roof laid |
-
latitude : 23.3441465
Longitude : 86.56904721
file name : Image_20112023121847969.png
|
2023-11-20 12:18:48.039763 |
175 |
58728198 |
Installation Tubewell at Bhalur Danga Lakhanpur II Sansad |
80000 |
Installation Tubewell at Bhalur Danga Lakhanpur II Sansad1 |
Plinth level |
-
latitude : 23.34413981
Longitude : 86.56902793
file name : Image_20112023120753910.png
|
2023-11-20 12:07:53.982726 |
176 |
58728198 |
Installation Tubewell at Bhalur Danga Lakhanpur II Sansad |
80000 |
Installation Tubewell at Bhalur Danga Lakhanpur II Sansad1 |
Plinth level |
-
latitude : 23.3441455
Longitude : 86.56902044
file name : Image_20112023120658665.png
|
2023-11-20 12:06:58.739172 |
177 |
58728198 |
Installation Tubewell at Bhalur Danga Lakhanpur II Sansad |
80000 |
Installation Tubewell at Bhalur Danga Lakhanpur II Sansad1 |
Completion of work |
-
latitude : 23.34411901
Longitude : 86.56899967
file name : Image_20112023114111576.png
|
2023-11-20 11:41:11.664869 |
178 |
58728198 |
Installation Tubewell at Bhalur Danga Lakhanpur II Sansad |
80000 |
Installation Tubewell at Bhalur Danga Lakhanpur II Sansad1 |
Completion of work |
-
latitude : 23.34413282
Longitude : 86.56900576
file name : Image_20112023111639754.png
|
2023-11-20 11:16:39.829763 |
179 |
58728198 |
Installation Tubewell at Bhalur Danga Lakhanpur II Sansad |
80000 |
Installation Tubewell at Bhalur Danga Lakhanpur II Sansad1 |
Completion of work |
-
latitude : 23.34413488
Longitude : 86.56901693
file name : Image_20112023111420340.png
|
2023-11-20 11:14:20.413587 |
180 |
58728198 |
Installation Tubewell at Bhalur Danga Lakhanpur II Sansad |
80000 |
Installation Tubewell at Bhalur Danga Lakhanpur II Sansad1 |
Completion of work |
-
latitude : 23.34412159
Longitude : 86.56902993
file name : Image_20112023101524886.png
|
2023-11-20 10:15:24.966479 |
181 |
58728310 |
Installation of Tube well at Mahato para Khairipihira |
80000 |
Installation of Tube well at Mahato para Khairipihira1 |
Roof laid |
-
latitude : 23.36696083
Longitude : 86.58543191
file name : Image_21112023123325014.png
|
2023-11-21 12:33:25.088497 |
182 |
58728310 |
Installation of Tube well at Mahato para Khairipihira |
80000 |
Installation of Tube well at Mahato para Khairipihira1 |
Plinth level |
-
latitude : 23.36700433
Longitude : 86.58542902
file name : Image_21112023122357260.png
|
2023-11-21 12:23:57.322012 |
183 |
58728310 |
Installation of Tube well at Mahato para Khairipihira |
80000 |
Installation of Tube well at Mahato para Khairipihira1 |
Completion of work |
-
latitude : 23.36695711
Longitude : 86.58542787
file name : Image_21112023121027573.png
|
2023-11-21 12:10:27.643411 |
184 |
58841048 |
Installation of Tube wel near Binodh Mahato Khamar Bari |
80000 |
Installation of Tube wel near Binodh Mahato Khamar Bari1 |
Roof laid |
-
latitude : 23.34688213
Longitude : 86.60418785
file name : Image_20112023140208038.png
|
2023-11-20 14:02:08.105401 |
185 |
58841048 |
Installation of Tube wel near Binodh Mahato Khamar Bari |
80000 |
Installation of Tube wel near Binodh Mahato Khamar Bari1 |
Roof laid |
-
latitude : 23.34690559
Longitude : 86.6041753
file name : Image_20112023135720857.png
|
2023-11-20 13:57:20.923839 |
186 |
58841048 |
Installation of Tube wel near Binodh Mahato Khamar Bari |
80000 |
Installation of Tube wel near Binodh Mahato Khamar Bari1 |
Roof laid |
-
latitude : 23.34692299
Longitude : 86.60417627
file name : Image_20112023140043047.png
|
2023-11-20 14:00:43.108923 |
187 |
58841048 |
Installation of Tube wel near Binodh Mahato Khamar Bari |
80000 |
Installation of Tube wel near Binodh Mahato Khamar Bari1 |
Plinth level |
-
latitude : 23.3469027
Longitude : 86.60418326
file name : Image_20112023135240650.png
|
2023-11-20 13:52:40.717146 |
188 |
58841048 |
Installation of Tube wel near Binodh Mahato Khamar Bari |
80000 |
Installation of Tube wel near Binodh Mahato Khamar Bari1 |
Plinth level |
-
latitude : 23.34691268
Longitude : 86.60417357
file name : Image_20112023135043147.png
|
2023-11-20 13:50:43.213725 |
189 |
58841048 |
Installation of Tube wel near Binodh Mahato Khamar Bari |
80000 |
Installation of Tube wel near Binodh Mahato Khamar Bari1 |
Completion of work |
-
latitude : 23.34694907
Longitude : 86.60416104
file name : Image_20112023134305573.png
|
2023-11-20 13:43:04.605969 |
190 |
48423128 |
Installation Tube well at Lakhanpur-III gram Sansad |
70000 |
Installation Tube well at Lakhanpur-III gram Sansad1 |
Roof laid |
-
latitude : 23.35730643
Longitude : 86.58134951
file name : Image_22112023151603537.png
|
2023-11-22 15:16:03.605393 |
191 |
48423128 |
Installation Tube well at Lakhanpur-III gram Sansad |
70000 |
Installation Tube well at Lakhanpur-III gram Sansad1 |
Plinth level |
-
latitude : 23.3573015
Longitude : 86.58135107
file name : Image_22112023151442518.png
|
2023-11-22 15:14:42.585104 |
192 |
48423128 |
Installation Tube well at Lakhanpur-III gram Sansad |
70000 |
Installation Tube well at Lakhanpur-III gram Sansad1 |
Plinth level |
-
latitude : 23.35732858
Longitude : 86.58133346
file name : Image_22112023150814608.png
|
2023-11-22 15:08:14.676801 |
193 |
48423128 |
Installation Tube well at Lakhanpur-III gram Sansad |
70000 |
Installation Tube well at Lakhanpur-III gram Sansad1 |
Completion of work |
-
latitude : 23.3573414
Longitude : 86.58133717
file name : Image_22112023150020433.png
|
2023-11-22 15:00:20.509224 |
194 |
58728413 |
Installation Tube well at Mudidih last end Raban Mandi Khet |
80000 |
Installation Tube well at Mudidih last end Raban Mandi Khet1 |
Roof laid |
-
latitude : 23.37768024
Longitude : 86.60765052
file name : Image_23112023151057941.png
|
2023-11-23 15:10:58.009471 |
195 |
58728413 |
Installation Tube well at Mudidih last end Raban Mandi Khet |
80000 |
Installation Tube well at Mudidih last end Raban Mandi Khet1 |
Plinth level |
-
latitude : 23.37768068
Longitude : 86.60758545
file name : Image_23112023150606087.png
|
2023-11-23 15:06:06.153535 |
196 |
58728413 |
Installation Tube well at Mudidih last end Raban Mandi Khet |
80000 |
Installation Tube well at Mudidih last end Raban Mandi Khet1 |
Completion of work |
-
latitude : 23.37770165
Longitude : 86.6075748
file name : Image_23112023145936177.png
|
2023-11-23 14:59:36.24883 |
197 |
58728390 |
Installation of Tube well near Mallik Para SSK |
80000 |
Installation of Tube well near Mallik Para SSK1 |
Roof laid |
-
latitude : 23.38552243
Longitude : 86.60483244
file name : Image_22112023160818818.png
|
2023-11-22 16:08:18.889081 |
198 |
58728390 |
Installation of Tube well near Mallik Para SSK |
80000 |
Installation of Tube well near Mallik Para SSK1 |
Plinth level |
-
latitude : 23.38551505
Longitude : 86.60485399
file name : Image_22112023160400179.png
|
2023-11-22 16:04:00.261746 |
199 |
58728390 |
Installation of Tube well near Mallik Para SSK |
80000 |
Installation of Tube well near Mallik Para SSK1 |
Completion of work |
-
latitude : 23.38551328
Longitude : 86.60482664
file name : Image_22112023155713500.png
|
2023-11-22 15:57:13.574615 |
200 |
67784862 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 23.38099577
Longitude : 86.60901237
file name : Image_22112023154448854.png
|
2023-11-22 15:44:48.922147 |
201 |
67784862 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 23.38098922
Longitude : 86.60900041
file name : Image_22112023154048745.png
|
2023-11-22 15:40:48.814513 |
202 |
67784862 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.38101831
Longitude : 86.60900469
file name : Image_22112023153321229.png
|
2023-11-22 15:33:21.292448 |
203 |
58835904 |
Installation of Tube well at Kharbana |
80000 |
Installation of Tube well at Kharbana1 |
Roof laid |
-
latitude : 23.37294615
Longitude : 86.61032108
file name : Image_24112023161757288.png
|
2023-11-24 16:17:57.363432 |
204 |
58835904 |
Installation of Tube well at Kharbana |
80000 |
Installation of Tube well at Kharbana1 |
Plinth level |
-
latitude : 23.37290612
Longitude : 86.61028008
file name : Image_24112023161056787.png
|
2023-11-24 16:10:56.853619 |
205 |
58835904 |
Installation of Tube well at Kharbana |
80000 |
Installation of Tube well at Kharbana1 |
Plinth level |
-
latitude : 23.37293543
Longitude : 86.61023735
file name : Image_24112023161349694.png
|
2023-11-24 16:13:49.763272 |
206 |
58835904 |
Installation of Tube well at Kharbana |
80000 |
Installation of Tube well at Kharbana1 |
Completion of work |
-
latitude : 23.37293171
Longitude : 86.6102806
file name : Image_24112023155206817.png
|
2023-11-24 15:52:06.898923 |
207 |
58728286 |
Installation of Tube well near Khairpihira ICDS Center |
80000 |
Installation of Tube well near Khairpihira ICDS Center1 |
Roof laid |
-
latitude : 23.36789148
Longitude : 86.58203302
file name : Image_03122023140600589.png
|
2023-12-03 14:06:00.645027 |
208 |
58728286 |
Installation of Tube well near Khairpihira ICDS Center |
80000 |
Installation of Tube well near Khairpihira ICDS Center1 |
Roof laid |
-
latitude : 23.36779572
Longitude : 86.58205885
file name : Image_03122023140459989.png
|
2023-12-03 14:05:00.042295 |
209 |
58728286 |
Installation of Tube well near Khairpihira ICDS Center |
80000 |
Installation of Tube well near Khairpihira ICDS Center1 |
Plinth level |
-
latitude : 23.36779898
Longitude : 86.58205854
file name : Image_03122023140021156.png
|
2023-12-03 14:00:21.229081 |
210 |
58728286 |
Installation of Tube well near Khairpihira ICDS Center |
80000 |
Installation of Tube well near Khairpihira ICDS Center1 |
Plinth level |
-
latitude : 23.36774207
Longitude : 86.58201563
file name : Image_03122023135748658.png
|
2023-12-03 13:57:48.719411 |
211 |
58728286 |
Installation of Tube well near Khairpihira ICDS Center |
80000 |
Installation of Tube well near Khairpihira ICDS Center1 |
Completion of work |
-
latitude : 23.3677916
Longitude : 86.58208978
file name : Image_03122023134200690.png
|
2023-12-03 13:42:00.751199 |
212 |
48432637 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad |
140000 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad1 |
Roof laid |
-
latitude : 23.38153762
Longitude : 86.61010701
file name : Image_03122023152336808.png
|
2023-12-03 15:23:36.863739 |
213 |
48432637 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad |
140000 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad1 |
Plinth level |
-
latitude : 23.38092476
Longitude : 86.60751495
file name : Image_03122023151410814.png
|
2023-12-03 15:14:10.888917 |
214 |
48432637 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad |
140000 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad1 |
Completion of work |
-
latitude : 23.38152408
Longitude : 86.61010325
file name : Image_03122023145750421.png
|
2023-12-03 14:57:50.474928 |
215 |
48432637 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad |
140000 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad1 |
Completion of work |
-
latitude : 23.38150881
Longitude : 86.61009267
file name : Image_03122023144807444.png
|
2023-12-03 14:48:07.503206 |
216 |
48432637 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad |
140000 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad1 |
Completion of work |
-
latitude : 23.3809067
Longitude : 86.60753252
file name : Image_03122023144212972.png
|
2023-12-03 14:42:13.033721 |
217 |
48432637 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad |
140000 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad1 |
Completion of work |
-
latitude : 23.38090354
Longitude : 86.60750867
file name : Image_03122023142915726.png
|
2023-12-03 14:29:15.78775 |
218 |
48432637 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad |
140000 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad1 |
Completion of work |
-
latitude : 23.38151044
Longitude : 86.61009439
file name : Image_03122023142715964.png
|
2023-12-03 14:27:16.033359 |
219 |
48432637 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad |
140000 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad2 |
Roof laid |
-
latitude : 23.38094552
Longitude : 86.60751805
file name : Image_03122023152128316.png
|
2023-12-03 15:21:28.365703 |
220 |
48432637 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad |
140000 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad2 |
Roof laid |
-
latitude : 23.3809217
Longitude : 86.60754461
file name : Image_03122023152023773.png
|
2023-12-03 15:20:23.833498 |
221 |
48432637 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad |
140000 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad2 |
Plinth level |
-
latitude : 23.38091875
Longitude : 86.60753784
file name : Image_03122023151507121.png
|
2023-12-03 15:15:07.177956 |
222 |
48432637 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad |
140000 |
Installation of Two no Tube well at Lakhanpur VI Gram Sansad2 |
Completion of work |
-
latitude : 23.3809491
Longitude : 86.60751756
file name : Image_03122023150150802.png
|
2023-12-03 15:01:50.870918 |
223 |
67782181 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 23.34406929
Longitude : 86.57536143
file name : Image_24112023151121142.png
|
2023-11-24 15:11:21.229156 |
224 |
67782181 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 23.34408725
Longitude : 86.57536804
file name : Image_24112023150302558.png
|
2023-11-24 15:03:02.624581 |
225 |
67782181 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.34410608
Longitude : 86.57535723
file name : Image_24112023145304428.png
|
2023-11-24 14:53:04.496993 |
226 |
58844640 |
Drinking Water tube well Maintenance GP area |
350000 |
Drinking Water tube well Maintenance GP area1 |
Roof laid |
-
latitude : 23.34094838
Longitude : 86.57577627
file name : Image_05022024150459256.png
|
2024-02-05 15:04:59.36788 |
227 |
58844640 |
Drinking Water tube well Maintenance GP area |
350000 |
Drinking Water tube well Maintenance GP area1 |
Plinth level |
-
latitude : 23.34095865
Longitude : 86.57574728
file name : Image_05022024145943509.png
|
2024-02-05 14:59:43.579912 |
228 |
58844640 |
Drinking Water tube well Maintenance GP area |
350000 |
Drinking Water tube well Maintenance GP area1 |
Completion of work |
-
latitude : 23.34096075
Longitude : 86.57575714
file name : Image_05022024144508420.png
|
2024-02-05 14:45:08.564779 |
229 |
67783350 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 23.35104774
Longitude : 86.5825422
file name : Image_25112023135555676.png
|
2023-11-25 13:55:55.740065 |
230 |
67783350 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 23.35108389
Longitude : 86.58258704
file name : Image_25112023134657553.png
|
2023-11-25 13:46:57.618875 |
231 |
67783350 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.35106414
Longitude : 86.58260419
file name : Image_25112023134112483.png
|
2023-11-25 13:41:12.557759 |
232 |
67059918 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.37242832
Longitude : 86.58585349
file name : Image_09022024102441575.png
|
2024-02-09 10:24:41.649685 |
233 |
67059918 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.37245069
Longitude : 86.58585641
file name : Image_09022024101811940.png
|
2024-02-09 10:18:12.020529 |
234 |
67059918 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.37243
Longitude : 86.58581568
file name : Image_09022024101351886.png
|
2024-02-09 10:13:51.969889 |
235 |
48434957 |
Construction of Palma Community Park Boundary Wall drain with park accessories |
230000 |
Construction of Palma Community Park Boundary Wall drain with park accessories1 |
Roof laid |
-
latitude : 23.34067929,23.34072264
Longitude : 86.5884724,86.58849032
file name : Image_09022024092404479.png
|
2024-02-09 09:24:04.543865 |
236 |
48434957 |
Construction of Palma Community Park Boundary Wall drain with park accessories |
230000 |
Construction of Palma Community Park Boundary Wall drain with park accessories1 |
Roof laid |
-
latitude : 23.34098466,23.34070617
Longitude : 86.58864077,86.58846884
file name : Image_09022024091902096.png
|
2024-02-09 09:19:02.153879 |
237 |
48434957 |
Construction of Palma Community Park Boundary Wall drain with park accessories |
230000 |
Construction of Palma Community Park Boundary Wall drain with park accessories1 |
Plinth level |
-
latitude : 23.34065696,23.34056982
Longitude : 86.58843433,86.58841921
file name : Image_09022024091040196.png
|
2024-02-09 09:10:40.258134 |
238 |
48434957 |
Construction of Palma Community Park Boundary Wall drain with park accessories |
230000 |
Construction of Palma Community Park Boundary Wall drain with park accessories1 |
Completion of work |
-
latitude : 23.34101014,23.34080611
Longitude : 86.58863561,86.58854942
file name : Image_09022024090319150.png
|
2024-02-09 09:03:19.213539 |
239 |
58727915 |
Construction of PCC Road From Pucca Road to Rasik Mahato Khet |
150000 |
Construction of PCC Road From Pucca Road to Rasik Mahato Khet1 |
Roof laid |
-
latitude : 23.32316648,23.32316734
Longitude : 86.60141468,86.60141509
file name : Image_04122023133151753.png
|
2023-12-04 13:31:51.822966 |
240 |
58727915 |
Construction of PCC Road From Pucca Road to Rasik Mahato Khet |
150000 |
Construction of PCC Road From Pucca Road to Rasik Mahato Khet1 |
Roof laid |
-
latitude : 23.32317409,23.32316812
Longitude : 86.6014297,86.60140958
file name : Image_04122023132633295.png
|
2023-12-04 13:26:33.36561 |
241 |
58727915 |
Construction of PCC Road From Pucca Road to Rasik Mahato Khet |
150000 |
Construction of PCC Road From Pucca Road to Rasik Mahato Khet1 |
Plinth level |
-
latitude : 23.32357307,23.32356945
Longitude : 86.60173308,86.60172895
file name : Image_04122023132043460.png
|
2023-12-04 13:20:43.523317 |
242 |
58727915 |
Construction of PCC Road From Pucca Road to Rasik Mahato Khet |
150000 |
Construction of PCC Road From Pucca Road to Rasik Mahato Khet1 |
Plinth level |
-
latitude : 23.32372925,23.32372973,23.32372049
Longitude : 86.6018665,86.6018676,86.60187332
file name : Image_04122023131958892.png
|
2023-12-04 13:19:58.961855 |
243 |
58727915 |
Construction of PCC Road From Pucca Road to Rasik Mahato Khet |
150000 |
Construction of PCC Road From Pucca Road to Rasik Mahato Khet1 |
Completion of work |
-
latitude : 23.32360259,23.32360412,23.32360438
Longitude : 86.60171545,86.60171473,86.60171433
file name : Image_04122023131414203.png
|
2023-12-04 13:14:14.27078 |
244 |
58727915 |
Construction of PCC Road From Pucca Road to Rasik Mahato Khet |
150000 |
Construction of PCC Road From Pucca Road to Rasik Mahato Khet1 |
Completion of work |
-
latitude : 23.32318787,23.32317872
Longitude : 86.60141431,86.60141601
file name : Image_04122023131233701.png
|
2023-12-04 13:12:33.772088 |
245 |
58839085 |
Installation of Tube well at Murakuli Madhuban |
80000 |
Installation of Tube well at Murakuli Madhuban1 |
Plinth level |
-
latitude : 23.32699173
Longitude : 86.59931798
file name : Image_04122023134631782.png
|
2023-12-04 13:46:31.845559 |
246 |
58839085 |
Installation of Tube well at Murakuli Madhuban |
80000 |
Installation of Tube well at Murakuli Madhuban1 |
Completion of work |
-
latitude : 23.32699797
Longitude : 86.59924881
file name : Image_04122023133236755.png
|
2023-12-04 13:32:36.843868 |
247 |
58728038 |
Installation of Fie Nos Solar Light at Palma Village |
150000 |
Installation of Fie Nos Solar Light at Palma Village1 |
Roof laid |
-
latitude : 23.34456378
Longitude : 86.58960252
file name : Image_06122023151204885.png
|
2023-12-06 15:12:04.983103 |
248 |
58728038 |
Installation of Fie Nos Solar Light at Palma Village |
150000 |
Installation of Fie Nos Solar Light at Palma Village1 |
Plinth level |
-
latitude : 23.34457084
Longitude : 86.58959672
file name : Image_06122023150447316.png
|
2023-12-06 15:04:47.390345 |
249 |
58728038 |
Installation of Fie Nos Solar Light at Palma Village |
150000 |
Installation of Fie Nos Solar Light at Palma Village1 |
Completion of work |
-
latitude : 23.33961145
Longitude : 86.56849451
file name : Image_06122023141812633.png
|
2023-12-06 14:18:12.723315 |
250 |
58728038 |
Installation of Fie Nos Solar Light at Palma Village |
150000 |
Installation of Fie Nos Solar Light at Palma Village2 |
Roof laid |
-
latitude : 23.34561838
Longitude : 86.58979607
file name : Image_06122023151426520.png
|
2023-12-06 15:14:26.647918 |
251 |
58728038 |
Installation of Fie Nos Solar Light at Palma Village |
150000 |
Installation of Fie Nos Solar Light at Palma Village2 |
Plinth level |
-
latitude : 23.34561061
Longitude : 86.58978752
file name : Image_06122023150329932.png
|
2023-12-06 15:03:30.055315 |
252 |
58728038 |
Installation of Fie Nos Solar Light at Palma Village |
150000 |
Installation of Fie Nos Solar Light at Palma Village2 |
Completion of work |
-
latitude : 23.34562583
Longitude : 86.58978519
file name : Image_06122023143425737.png
|
2023-12-06 14:34:25.870035 |
253 |
58728038 |
Installation of Fie Nos Solar Light at Palma Village |
150000 |
Installation of Fie Nos Solar Light at Palma Village3 |
Roof laid |
-
latitude : 23.34526794
Longitude : 86.59088236
file name : Image_06122023151834268.png
|
2023-12-06 15:18:34.338975 |
254 |
58728038 |
Installation of Fie Nos Solar Light at Palma Village |
150000 |
Installation of Fie Nos Solar Light at Palma Village3 |
Roof laid |
-
latitude : 23.34513968
Longitude : 86.59087327
file name : Image_06122023151628251.png
|
2023-12-06 15:16:28.336785 |
255 |
58728038 |
Installation of Fie Nos Solar Light at Palma Village |
150000 |
Installation of Fie Nos Solar Light at Palma Village3 |
Plinth level |
-
latitude : 23.3450718
Longitude : 86.5909038
file name : Image_06122023150118189.png
|
2023-12-06 15:01:18.386594 |
256 |
58728038 |
Installation of Fie Nos Solar Light at Palma Village |
150000 |
Installation of Fie Nos Solar Light at Palma Village3 |
Completion of work |
-
latitude : 23.34485356
Longitude : 86.59082359
file name : Image_06122023143557052.png
|
2023-12-06 14:35:57.137462 |
257 |
58728038 |
Installation of Fie Nos Solar Light at Palma Village |
150000 |
Installation of Fie Nos Solar Light at Palma Village4 |
Roof laid |
-
latitude : 23.34653823
Longitude : 86.59167359
file name : Image_06122023152138290.png
|
2023-12-06 15:21:38.383891 |
258 |
58728038 |
Installation of Fie Nos Solar Light at Palma Village |
150000 |
Installation of Fie Nos Solar Light at Palma Village4 |
Plinth level |
-
latitude : 23.34650796
Longitude : 86.59170231
file name : Image_06122023150028934.png
|
2023-12-06 15:00:29.026032 |
259 |
58728038 |
Installation of Fie Nos Solar Light at Palma Village |
150000 |
Installation of Fie Nos Solar Light at Palma Village4 |
Completion of work |
-
latitude : 23.34651429
Longitude : 86.59164296
file name : Image_06122023144031414.png
|
2023-12-06 14:40:31.570455 |
260 |
58728038 |
Installation of Fie Nos Solar Light at Palma Village |
150000 |
Installation of Fie Nos Solar Light at Palma Village5 |
Roof laid |
-
latitude : 23.34701451
Longitude : 86.59190549
file name : Image_06122023152320336.png
|
2023-12-06 15:23:20.472885 |
261 |
58728038 |
Installation of Fie Nos Solar Light at Palma Village |
150000 |
Installation of Fie Nos Solar Light at Palma Village5 |
Plinth level |
-
latitude : 23.34693751
Longitude : 86.59182437
file name : Image_06122023145808126.png
|
2023-12-06 14:58:08.218072 |
262 |
58728038 |
Installation of Fie Nos Solar Light at Palma Village |
150000 |
Installation of Fie Nos Solar Light at Palma Village5 |
Completion of work |
-
latitude : 23.3470279
Longitude : 86.59188242
file name : Image_06122023144837319.png
|
2023-12-06 14:48:37.428448 |
263 |
67783527 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 23.3663856
Longitude : 86.58890442
file name : Image_06122023161417724.png
|
2023-12-06 16:14:17.791579 |
264 |
67783527 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 23.36640148
Longitude : 86.58888542
file name : Image_06122023161341484.png
|
2023-12-06 16:13:41.553046 |
265 |
67783527 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 23.36635935
Longitude : 86.58889053
file name : Image_06122023160055492.png
|
2023-12-06 16:00:55.554752 |
266 |
67783527 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.36640132
Longitude : 86.58888896
file name : Image_06122023155136358.png
|
2023-12-06 15:51:36.429764 |
267 |
58727810 |
Installation of Three Nos Solar Light under Khairipihira V Sansad |
90000 |
Installation of Three Nos Solar Light under Khairipihira V Sansad1 |
Roof laid |
-
latitude : 23.37121478
Longitude : 86.59210485
file name : Image_08122023133831178.png
|
2023-12-08 13:38:31.253649 |
268 |
58727810 |
Installation of Three Nos Solar Light under Khairipihira V Sansad |
90000 |
Installation of Three Nos Solar Light under Khairipihira V Sansad1 |
Plinth level |
-
latitude : 23.37116432
Longitude : 86.59205678
file name : Image_08122023130734372.png
|
2023-12-08 13:07:34.511066 |
269 |
58727810 |
Installation of Three Nos Solar Light under Khairipihira V Sansad |
90000 |
Installation of Three Nos Solar Light under Khairipihira V Sansad1 |
Completion of work |
-
latitude : 23.3712208
Longitude : 86.59204796
file name : Image_08122023123712179.png
|
2023-12-08 12:37:12.250226 |
270 |
58727810 |
Installation of Three Nos Solar Light under Khairipihira V Sansad |
90000 |
Installation of Three Nos Solar Light under Khairipihira V Sansad2 |
Roof laid |
-
latitude : 23.38027909
Longitude : 86.5938625
file name : Image_08122023133004095.png
|
2023-12-08 13:30:04.196024 |
271 |
58727810 |
Installation of Three Nos Solar Light under Khairipihira V Sansad |
90000 |
Installation of Three Nos Solar Light under Khairipihira V Sansad2 |
Plinth level |
-
latitude : 23.38051047
Longitude : 86.59386249
file name : Image_08122023131327568.png
|
2023-12-08 13:13:27.652041 |
272 |
58727810 |
Installation of Three Nos Solar Light under Khairipihira V Sansad |
90000 |
Installation of Three Nos Solar Light under Khairipihira V Sansad2 |
Completion of work |
-
latitude : 23.38051055
Longitude : 86.59384831
file name : Image_08122023124530906.png
|
2023-12-08 12:45:30.979867 |
273 |
58727810 |
Installation of Three Nos Solar Light under Khairipihira V Sansad |
90000 |
Installation of Three Nos Solar Light under Khairipihira V Sansad3 |
Roof laid |
-
latitude : 23.37229676
Longitude : 86.58654288
file name : Image_08122023133052524.png
|
2023-12-08 13:30:52.670514 |
274 |
58727810 |
Installation of Three Nos Solar Light under Khairipihira V Sansad |
90000 |
Installation of Three Nos Solar Light under Khairipihira V Sansad3 |
Plinth level |
-
latitude : 23.37226814
Longitude : 86.5865737
file name : Image_08122023130205410.png
|
2023-12-08 13:02:05.48232 |
275 |
58727810 |
Installation of Three Nos Solar Light under Khairipihira V Sansad |
90000 |
Installation of Three Nos Solar Light under Khairipihira V Sansad3 |
Completion of work |
-
latitude : 23.37233286
Longitude : 86.58651722
file name : Image_08122023124725448.png
|
2023-12-08 12:47:25.518061 |
276 |
58728227 |
Installation of Tube well Near Shanti Mudi House Lakhanpur II Sansad |
80000 |
Installation of Tube well Near Shanti Mudi House Lakhanpur II Sansad1 |
Roof laid |
-
latitude : 23.34098705
Longitude : 86.5682062
file name : Image_19062024131852353.png
|
2024-06-19 13:18:52.462496 |
277 |
58728227 |
Installation of Tube well Near Shanti Mudi House Lakhanpur II Sansad |
80000 |
Installation of Tube well Near Shanti Mudi House Lakhanpur II Sansad1 |
Plinth level |
-
latitude : 23.3407979
Longitude : 86.5684324
file name : Image_19062024123746601.png
|
2024-06-19 12:37:46.697757 |
278 |
58728227 |
Installation of Tube well Near Shanti Mudi House Lakhanpur II Sansad |
80000 |
Installation of Tube well Near Shanti Mudi House Lakhanpur II Sansad1 |
Plinth level |
-
latitude : 23.34100313
Longitude : 86.56824709
file name : Image_07122023152950449.png
|
2023-12-07 15:29:50.508359 |
279 |
58728227 |
Installation of Tube well Near Shanti Mudi House Lakhanpur II Sansad |
80000 |
Installation of Tube well Near Shanti Mudi House Lakhanpur II Sansad1 |
Completion of work |
-
latitude : 23.34097373
Longitude : 86.56826908
file name : Image_07122023151945733.png
|
2023-12-07 15:19:45.803093 |
280 |
67824730 |
Construction of roads |
176998 |
Construction of roads1 |
Roof laid |
-
latitude : 23.37634674,23.37632965
Longitude : 86.60325642,86.6032814
file name : Image_08122023165101934.png
|
2023-12-08 16:51:01.999561 |
281 |
67824730 |
Construction of roads |
176998 |
Construction of roads1 |
Roof laid |
-
latitude : 23.37197195,23.37197104,23.37197288
Longitude : 86.58946728,86.5894632,86.58946391
file name : Image_08122023163037637.png
|
2023-12-08 16:30:37.706786 |
282 |
67824730 |
Construction of roads |
176998 |
Construction of roads1 |
Plinth level |
-
latitude : 23.37198091,23.37198333
Longitude : 86.58958519,86.5895917
file name : Image_08122023162651059.png
|
2023-12-08 16:26:51.134503 |
283 |
67824730 |
Construction of roads |
176998 |
Construction of roads1 |
Completion of work |
-
latitude : 23.3720004,23.37200832
Longitude : 86.58913416,86.58912372
file name : Image_08122023162236309.png
|
2023-12-08 16:22:36.38145 |
284 |
58728337 |
Installation of Tube well near Shanti Roy House at Simapathar |
80000 |
Installation of Tube well near Shanti Roy House at Simapathar1 |
Plinth level |
-
latitude : 23.37635805
Longitude : 86.60328915
file name : Image_08122023164907372.png
|
2023-12-08 16:49:07.436645 |
285 |
58728337 |
Installation of Tube well near Shanti Roy House at Simapathar |
80000 |
Installation of Tube well near Shanti Roy House at Simapathar1 |
Plinth level |
-
latitude : 23.37633768
Longitude : 86.6033328
file name : Image_08122023164510698.png
|
2023-12-08 16:45:10.769521 |
286 |
58728337 |
Installation of Tube well near Shanti Roy House at Simapathar |
80000 |
Installation of Tube well near Shanti Roy House at Simapathar1 |
Completion of work |
-
latitude : 23.37636234
Longitude : 86.60328884
file name : Image_08122023163639009.png
|
2023-12-08 16:36:39.083039 |
287 |
107098846 |
Procurement of Tarpaulin Utensils, Furniture for Community Hall |
175000 |
Procurement of Tarpaulin Utensils, Furniture for Community Hall1 |
Roof laid |
-
latitude : 23.34137418
Longitude : 86.57621932
file name : Image_30092024131530444.png
|
2024-09-30 13:15:30.536098 |
288 |
107098846 |
Procurement of Tarpaulin Utensils, Furniture for Community Hall |
175000 |
Procurement of Tarpaulin Utensils, Furniture for Community Hall1 |
Roof laid |
-
latitude : 23.34138248
Longitude : 86.57634611
file name : Image_30092024131526129.png
|
2024-09-30 13:15:26.236455 |
289 |
107098846 |
Procurement of Tarpaulin Utensils, Furniture for Community Hall |
175000 |
Procurement of Tarpaulin Utensils, Furniture for Community Hall1 |
Plinth level |
-
latitude : 23.3414851
Longitude : 86.57643455
file name : Image_24092024122353791.png
|
2024-09-24 12:23:53.913818 |
290 |
107098846 |
Procurement of Tarpaulin Utensils, Furniture for Community Hall |
175000 |
Procurement of Tarpaulin Utensils, Furniture for Community Hall1 |
Completion of work |
-
latitude : 23.34140682
Longitude : 86.576428
file name : Image_24092024120740793.png
|
2024-09-24 12:07:40.954985 |
291 |
88834837 |
Creation of a new source of drinking water |
130990 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.37494348
Longitude : 86.58983268
file name : Image_15022024084748416.png
|
2024-02-15 08:47:48.480184 |
292 |
88834837 |
Creation of a new source of drinking water |
130990 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.37493082
Longitude : 86.58986429
file name : Image_15022024084414900.png
|
2024-02-15 08:44:14.963037 |
293 |
88834837 |
Creation of a new source of drinking water |
130990 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.3748817
Longitude : 86.58979946
file name : Image_15022024083506018.png
|
2024-02-15 08:35:06.088476 |
294 |
58727869 |
Construction PCC Road from Paju Majhi house to Nikhil Besra House |
150000 |
Construction PCC Road from Paju Majhi house to Nikhil Besra House1 |
Roof laid |
-
latitude : 23.3540143,23.35402021
Longitude : 86.6051766,86.60518528
file name : Image_19122023120129621.png
|
2023-12-19 12:01:29.697901 |
295 |
58727869 |
Construction PCC Road from Paju Majhi house to Nikhil Besra House |
150000 |
Construction PCC Road from Paju Majhi house to Nikhil Besra House1 |
Plinth level |
-
latitude : 23.35396643,23.35396536
Longitude : 86.60526881,86.60526525
file name : Image_18122023165343455.png
|
2023-12-18 16:53:43.522764 |
296 |
58727869 |
Construction PCC Road from Paju Majhi house to Nikhil Besra House |
150000 |
Construction PCC Road from Paju Majhi house to Nikhil Besra House1 |
Completion of work |
-
latitude : 23.35385084,23.35384594
Longitude : 86.60557047,86.60556914
file name : Image_18122023164135657.png
|
2023-12-18 16:41:35.730453 |
297 |
58728367 |
Installation fo Tube well at Neemkuli Football Math Khairipihira |
80000 |
Installation fo Tube well at Neemkuli Football Math Khairipihira1 |
Roof laid |
-
latitude : 23.37728819
Longitude : 86.59461806
file name : Image_24022024130908659.png
|
2024-02-24 13:09:08.743259 |
298 |
58728367 |
Installation fo Tube well at Neemkuli Football Math Khairipihira |
80000 |
Installation fo Tube well at Neemkuli Football Math Khairipihira1 |
Plinth level |
-
latitude : 23.37730613
Longitude : 86.59448872
file name : Image_24022024130641981.png
|
2024-02-24 13:06:42.050084 |
299 |
58728367 |
Installation fo Tube well at Neemkuli Football Math Khairipihira |
80000 |
Installation fo Tube well at Neemkuli Football Math Khairipihira1 |
Completion of work |
-
latitude : 23.37725227
Longitude : 86.59457057
file name : Image_24022024130305669.png
|
2024-02-24 13:03:05.738814 |
300 |
58728367 |
Installation fo Tube well at Neemkuli Football Math Khairipihira |
80000 |
Installation fo Tube well at Neemkuli Football Math Khairipihira1 |
Completion of work |
-
latitude : 23.37731244
Longitude : 86.59445318
file name : Image_22022024132819637.png
|
2024-02-22 13:28:19.711489 |
301 |
58858164 |
Drain Dipak Choudhury to Puratan bank Lakhanpur |
200000 |
Drain Dipak Choudhury to Puratan bank Lakhanpur1 |
Roof laid |
-
latitude : 23.34188051,23.3413998
Longitude : 86.57166879,86.5721014
file name : Image_24022024121108438.png
|
2024-02-24 12:11:08.510824 |
302 |
58858164 |
Drain Dipak Choudhury to Puratan bank Lakhanpur |
200000 |
Drain Dipak Choudhury to Puratan bank Lakhanpur1 |
Plinth level |
-
latitude : 23.34188219,23.34191327
Longitude : 86.5716963,86.57175245
file name : Image_24022024120717660.png
|
2024-02-24 12:07:17.736807 |
303 |
58858164 |
Drain Dipak Choudhury to Puratan bank Lakhanpur |
200000 |
Drain Dipak Choudhury to Puratan bank Lakhanpur1 |
Completion of work |
-
latitude : 23.34216301,23.3421343
Longitude : 86.57189168,86.5718754
file name : Image_24022024115741062.png
|
2024-02-24 11:57:41.13698 |
304 |
58858164 |
Drain Dipak Choudhury to Puratan bank Lakhanpur |
200000 |
Drain Dipak Choudhury to Puratan bank Lakhanpur1 |
Completion of work |
-
latitude : 23.34189465,23.34189905
Longitude : 86.57171021,86.57172768
file name : Image_21022024170618936.png
|
2024-02-21 17:06:19.016462 |
305 |
67799299 |
Construction of Toilets |
245099 |
Construction of Toilets1 |
Roof laid |
-
latitude : 23.35637735
Longitude : 86.58067059
file name : Image_24022024123614432.png
|
2024-02-24 12:36:14.502378 |
306 |
67799299 |
Construction of Toilets |
245099 |
Construction of Toilets1 |
Plinth level |
-
latitude : 23.3563889
Longitude : 86.58066496
file name : Image_24022024123024781.png
|
2024-02-24 12:30:24.858476 |
307 |
67799299 |
Construction of Toilets |
245099 |
Construction of Toilets1 |
Completion of work |
-
latitude : 23.35628682
Longitude : 86.58070205
file name : Image_24022024122002663.png
|
2024-02-24 12:20:02.739886 |
308 |
67799299 |
Construction of Toilets |
245099 |
Construction of Toilets1 |
Completion of work |
-
latitude : 23.35634476
Longitude : 86.58071216
file name : Image_21022024165848474.png
|
2024-02-21 16:58:48.574954 |
309 |
67783810 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 23.37088416
Longitude : 86.58067179
file name : Image_18122023160346823.png
|
2023-12-18 16:03:46.899299 |
310 |
67783810 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 23.37088311
Longitude : 86.58066912
file name : Image_18122023155440014.png
|
2023-12-18 15:54:40.087765 |
311 |
67783810 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.37089564
Longitude : 86.58066036
file name : Image_18122023154712501.png
|
2023-12-18 15:47:12.585141 |
312 |
67787207 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 23.3252268
Longitude : 86.59684835
file name : Image_19122023154654116.png
|
2023-12-19 15:46:54.185595 |
313 |
67787207 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 23.32519666
Longitude : 86.59682372
file name : Image_19122023153805903.png
|
2023-12-19 15:38:05.992518 |
314 |
67787207 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.3365076
Longitude : 86.5802659
file name : Image_19122023152917861.png
|
2023-12-19 15:29:17.93676 |
315 |
58910749 |
Construction Public Urinal with Soakpit near Rest Room Khaiipihira |
200000 |
Construction Public Urinal with Soakpit near Rest Room Khaiipihira1 |
Roof laid |
-
latitude : 23.37255813
Longitude : 86.58485228
file name : Image_24022024125619003.png
|
2024-02-24 12:56:19.094421 |
316 |
58910749 |
Construction Public Urinal with Soakpit near Rest Room Khaiipihira |
200000 |
Construction Public Urinal with Soakpit near Rest Room Khaiipihira1 |
Plinth level |
-
latitude : 23.37251982
Longitude : 86.58489373
file name : Image_24022024125047994.png
|
2024-02-24 12:50:48.077461 |
317 |
58910749 |
Construction Public Urinal with Soakpit near Rest Room Khaiipihira |
200000 |
Construction Public Urinal with Soakpit near Rest Room Khaiipihira1 |
Completion of work |
-
latitude : 23.37253038
Longitude : 86.58483733
file name : Image_24022024124623763.png
|
2024-02-24 12:46:23.839797 |
318 |
58915928 |
Construction Drain Kalipada Bauri house to Pucca drain |
100000 |
Construction Drain Kalipada Bauri house to Pucca drain1 |
Roof laid |
-
latitude : 23.32140744,23.32136734
Longitude : 86.60303687,86.60315041
file name : Image_21122023132730220.png
|
2023-12-21 13:27:30.325352 |
319 |
58915928 |
Construction Drain Kalipada Bauri house to Pucca drain |
100000 |
Construction Drain Kalipada Bauri house to Pucca drain1 |
Plinth level |
-
latitude : 23.32135599,23.3213681
Longitude : 86.60300189,86.60304387
file name : Image_21122023132130439.png
|
2023-12-21 13:21:30.50884 |
320 |
58915928 |
Construction Drain Kalipada Bauri house to Pucca drain |
100000 |
Construction Drain Kalipada Bauri house to Pucca drain1 |
Completion of work |
-
latitude : 23.33685714,23.32137315
Longitude : 86.57916401,86.60330468
file name : Image_21122023131239496.png
|
2023-12-21 13:12:39.580877 |
321 |
67787650 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 23.34840834
Longitude : 86.60283736
file name : Image_22122023143637498.png
|
2023-12-22 14:36:37.56657 |
322 |
67787650 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 23.34839956
Longitude : 86.60281569
file name : Image_22122023143232525.png
|
2023-12-22 14:32:32.592289 |
323 |
67787650 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.3485206
Longitude : 86.60284298
file name : Image_22122023141321173.png
|
2023-12-22 14:13:21.284554 |
324 |
67787915 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 23.34235698
Longitude : 86.59654638
file name : Image_22122023150052691.png
|
2023-12-22 15:00:52.75277 |
325 |
67787915 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 23.3423478
Longitude : 86.59650257
file name : Image_22122023145706419.png
|
2023-12-22 14:57:06.499067 |
326 |
67787915 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.34236743
Longitude : 86.59650736
file name : Image_22122023144720188.png
|
2023-12-22 14:47:20.268045 |
327 |
48432738 |
Installation of Deep Tube well at Dholkata |
160000 |
Installation of Deep Tube well at Dholkata1 |
Roof laid |
-
latitude : 23.3836717
Longitude : 86.60526164
file name : Image_26122023134155617.png
|
2023-12-26 13:41:55.691501 |
328 |
48432738 |
Installation of Deep Tube well at Dholkata |
160000 |
Installation of Deep Tube well at Dholkata1 |
Plinth level |
-
latitude : 23.38368197
Longitude : 86.6052276
file name : Image_26122023133740707.png
|
2023-12-26 13:37:40.767795 |
329 |
48432738 |
Installation of Deep Tube well at Dholkata |
160000 |
Installation of Deep Tube well at Dholkata1 |
Completion of work |
-
latitude : 23.38372232
Longitude : 86.60527021
file name : Image_26122023132935295.png
|
2023-12-26 13:29:35.371756 |
330 |
67057933 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.33711931
Longitude : 86.58319539
file name : Image_05032024151727259.png
|
2024-03-05 15:17:27.361248 |
331 |
67057933 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.33714869
Longitude : 86.58320724
file name : Image_05032024151429048.png
|
2024-03-05 15:14:29.133884 |
332 |
67057933 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.33708904
Longitude : 86.58320604
file name : Image_05032024150907094.png
|
2024-03-05 15:09:07.171844 |
333 |
67057933 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.33709131
Longitude : 86.5832328
file name : Image_05032024144221339.png
|
2024-03-05 14:42:21.420641 |
334 |
58913007 |
Construction Drain from Kalimela to Ramsundar Happa |
150000 |
Construction Drain from Kalimela to Ramsundar Happa1 |
Roof laid |
-
latitude : 23.38710427,23.38710377
Longitude : 86.60757614,86.60757426
file name : Image_05032024144046507.png
|
2024-03-05 14:40:46.610366 |
335 |
58913007 |
Construction Drain from Kalimela to Ramsundar Happa |
150000 |
Construction Drain from Kalimela to Ramsundar Happa1 |
Plinth level |
-
latitude : 23.38709907,23.38709835
Longitude : 86.60770437,86.60770523
file name : Image_05032024092403708.png
|
2024-03-05 09:24:03.786745 |
336 |
58913007 |
Construction Drain from Kalimela to Ramsundar Happa |
150000 |
Construction Drain from Kalimela to Ramsundar Happa1 |
Completion of work |
-
latitude : 23.38712449,23.38712448
Longitude : 86.60786421,86.60786422
file name : Image_05032024091803284.png
|
2024-03-05 09:18:03.360428 |
337 |
67786297 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 23.35429854
Longitude : 86.60552621
file name : Image_18122023163400144.png
|
2023-12-18 16:34:00.21867 |
338 |
67786297 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 23.3541961
Longitude : 86.60548594
file name : Image_18122023162648136.png
|
2023-12-18 16:26:48.211699 |
339 |
67786297 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.35423102
Longitude : 86.60553235
file name : Image_18122023162327817.png
|
2023-12-18 16:23:27.892258 |
340 |
67797647 |
Procurement of Waste Disposal Units |
245009 |
Procurement of Waste Disposal Units1 |
Roof laid |
-
latitude : 23.32150913
Longitude : 86.60369653
file name : Image_22042024161044621.png
|
2024-04-22 16:10:44.706842 |
341 |
67797647 |
Procurement of Waste Disposal Units |
245009 |
Procurement of Waste Disposal Units1 |
Plinth level |
-
latitude : 23.32167172
Longitude : 86.60432792
file name : Image_22042024160615131.png
|
2024-04-22 16:06:15.226857 |
342 |
67797647 |
Procurement of Waste Disposal Units |
245009 |
Procurement of Waste Disposal Units1 |
Completion of work |
-
latitude : 23.32165365
Longitude : 86.60425341
file name : Image_22042024160042536.png
|
2024-04-22 16:00:42.62112 |
343 |
67797647 |
Procurement of Waste Disposal Units |
245009 |
Procurement of Waste Disposal Units1 |
Completion of work |
-
latitude : 23.32146829
Longitude : 86.6038769
file name : Image_12032024093157418.png
|
2024-03-12 09:31:57.489243 |
344 |
67797647 |
Procurement of Waste Disposal Units |
245009 |
Procurement of Waste Disposal Units1 |
Completion of work |
-
latitude : 23.3215019
Longitude : 86.60371939
file name : Image_10032024152133092.png
|
2024-03-10 15:21:33.160716 |
345 |
67800684 |
Construction Toilet |
245189 |
Construction Toilet1 |
Roof laid |
-
latitude : 23.34001248
Longitude : 86.59852261
file name : Image_15062024102639073.png
|
2024-06-15 10:26:39.174643 |
346 |
67800684 |
Construction Toilet |
245189 |
Construction Toilet1 |
Plinth level |
-
latitude : 23.33997481
Longitude : 86.59847447
file name : Image_15062024102119040.png
|
2024-06-15 10:21:19.135602 |
347 |
67800684 |
Construction Toilet |
245189 |
Construction Toilet1 |
Completion of work |
-
latitude : 23.33977146
Longitude : 86.59845609
file name : Image_15062024101618323.png
|
2024-06-15 10:16:18.417478 |
348 |
67825054 |
Construction of roads |
180000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.32541984,23.32541984
Longitude : 86.59812839,86.59812839
file name : Image_27032024131446755.png
|
2024-03-27 13:14:46.834187 |
349 |
67825054 |
Construction of roads |
180000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.3257035,23.3257035
Longitude : 86.5986792,86.5986792
file name : Image_27032024131024837.png
|
2024-03-27 13:10:24.909061 |
350 |
67825054 |
Construction of roads |
180000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.33911169,23.3256878
Longitude : 86.56805027,86.598632
file name : Image_27032024130406808.png
|
2024-03-27 13:04:06.95252 |
351 |
67825054 |
Construction of roads |
180000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.3211522,23.3211522
Longitude : 86.601988,86.601988
file name : Image_23032024092611334.png
|
2024-03-23 09:26:11.404762 |
352 |
67825054 |
Construction of roads |
180000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.32522641,23.32524847
Longitude : 86.59773067,86.59771394
file name : Image_10032024151135869.png
|
2024-03-10 15:11:35.936177 |
353 |
67816454 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.3403464,23.340354
Longitude : 86.5687866,86.5687909
file name : Image_10032024133058040.png
|
2024-03-10 13:30:58.107558 |
354 |
67816454 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.3404239,23.3404239
Longitude : 86.5686891,86.5686891
file name : Image_10032024133055177.png
|
2024-03-10 13:30:55.249448 |
355 |
67823364 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.35279715,23.35279752
Longitude : 86.58127498,86.58127302
file name : Image_17042024073459718.png
|
2024-04-17 07:34:59.81912 |
356 |
67823364 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.35279468,23.35279269
Longitude : 86.58128036,86.58128081
file name : Image_17042024072923263.png
|
2024-04-17 07:29:23.356139 |
357 |
67823364 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.35277191,23.35278216,23.35278358
Longitude : 86.58126884,86.58127456,86.58127507
file name : Image_17042024072231584.png
|
2024-04-17 07:22:31.69862 |
358 |
67823364 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.35284733,23.35284489
Longitude : 86.58126993,86.58125895
file name : Image_12032024095356395.png
|
2024-03-12 09:53:56.462981 |
359 |
67823364 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.35273287,23.35276343
Longitude : 86.58142719,86.5814211
file name : Image_10032024133428249.png
|
2024-03-10 13:34:28.31728 |
360 |
67823364 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.35269214,23.35274598
Longitude : 86.58148333,86.58137956
file name : Image_10032024133242339.png
|
2024-03-10 13:32:42.413587 |
361 |
67824328 |
Construction of roads |
176997 |
Construction of roads1 |
Roof laid |
-
latitude : 23.36874636,23.36874636
Longitude : 86.58485371,86.58485371
file name : Image_08042024153728925.png
|
2024-04-08 15:37:29.037256 |
362 |
67824328 |
Construction of roads |
176997 |
Construction of roads1 |
Plinth level |
-
latitude : 23.36893254,23.36893254
Longitude : 86.58479072,86.58479072
file name : Image_08042024152804200.png
|
2024-04-08 15:28:04.306372 |
363 |
67824328 |
Construction of roads |
176997 |
Construction of roads1 |
Completion of work |
-
latitude : 23.36898781,23.36898722
Longitude : 86.5847944,86.58479153
file name : Image_08042024151021315.png
|
2024-04-08 15:10:21.430659 |
364 |
67824328 |
Construction of roads |
176997 |
Construction of roads1 |
Completion of work |
-
latitude : 23.36892604,23.36893283
Longitude : 86.58485933,86.58486637
file name : Image_10032024143950456.png
|
2024-03-10 14:39:50.548567 |
365 |
67799799 |
Construction of Community Sanitary Complex |
245099 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.37923371
Longitude : 86.60693701
file name : Image_31072024171629091.png
|
2024-07-31 17:16:29.18114 |
366 |
67799799 |
Construction of Community Sanitary Complex |
245099 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.37923971
Longitude : 86.60693035
file name : Image_31072024171307381.png
|
2024-07-31 17:13:07.469678 |
367 |
67799799 |
Construction of Community Sanitary Complex |
245099 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.37934563
Longitude : 86.60687704
file name : Image_31072024170246675.png
|
2024-07-31 17:02:46.769706 |
368 |
67799799 |
Construction of Community Sanitary Complex |
245099 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.38053932
Longitude : 86.60850412
file name : Image_10032024144322955.png
|
2024-03-10 14:43:23.036181 |
369 |
34783056 |
Gardwall of Jitu Garia at KhairipihiraKhairipihira |
140000 |
Gardwall of Jitu Garia at KhairipihiraKhairipihira1 |
Roof laid |
-
latitude : 23.36951053
Longitude : 86.58463438
file name : Image_08042024155641524.png
|
2024-04-08 15:56:41.623901 |
370 |
34783056 |
Gardwall of Jitu Garia at KhairipihiraKhairipihira |
140000 |
Gardwall of Jitu Garia at KhairipihiraKhairipihira1 |
Plinth level |
-
latitude : 23.3690361
Longitude : 86.58477893
file name : Image_08042024155305705.png
|
2024-04-08 15:53:05.826203 |
371 |
34783056 |
Gardwall of Jitu Garia at KhairipihiraKhairipihira |
140000 |
Gardwall of Jitu Garia at KhairipihiraKhairipihira1 |
Completion of work |
-
latitude : 23.36898581
Longitude : 86.58486108
file name : Image_08042024153857953.png
|
2024-04-08 15:38:58.109275 |
372 |
34783056 |
Gardwall of Jitu Garia at KhairipihiraKhairipihira |
140000 |
Gardwall of Jitu Garia at KhairipihiraKhairipihira1 |
Completion of work |
-
latitude : 23.36950998
Longitude : 86.58456675
file name : Image_10032024134452894.png
|
2024-03-10 13:44:52.974774 |
373 |
88835086 |
Construction of PCC road from Khairipihira Nich More to Ananda Mahato house |
400000 |
Construction of PCC road from Khairipihira Nich More to Ananda Mahato house1 |
Roof laid |
-
latitude : 23.37211841,23.37211665
Longitude : 86.59230558,86.59230299
file name : Image_14032024142635564.png
|
2024-03-14 14:26:35.624713 |
374 |
88835086 |
Construction of PCC road from Khairipihira Nich More to Ananda Mahato house |
400000 |
Construction of PCC road from Khairipihira Nich More to Ananda Mahato house1 |
Plinth level |
-
latitude : 23.37184165,23.37183544
Longitude : 86.59227016,86.59227662
file name : Image_14032024141559443.png
|
2024-03-14 14:15:59.519939 |
375 |
88835086 |
Construction of PCC road from Khairipihira Nich More to Ananda Mahato house |
400000 |
Construction of PCC road from Khairipihira Nich More to Ananda Mahato house1 |
Completion of work |
-
latitude : 23.37210974,23.37210697
Longitude : 86.59233069,86.5923214
file name : Image_14032024140542976.png
|
2024-03-14 14:05:43.051591 |
376 |
88835141 |
Construction of PCC road from Ajit Mahato house to Dikhardih |
350000 |
Construction of PCC road from Ajit Mahato house to Dikhardih1 |
Roof laid |
-
latitude : 23.34781324,23.34781321
Longitude : 86.59952903,86.59952908
file name : Image_14032024154613760.png
|
2024-03-14 15:46:13.8335 |
377 |
88835141 |
Construction of PCC road from Ajit Mahato house to Dikhardih |
350000 |
Construction of PCC road from Ajit Mahato house to Dikhardih1 |
Plinth level |
-
latitude : 23.3478241,23.34782509
Longitude : 86.5995547,86.59955501
file name : Image_14032024153552977.png
|
2024-03-14 15:35:53.053025 |
378 |
88835141 |
Construction of PCC road from Ajit Mahato house to Dikhardih |
350000 |
Construction of PCC road from Ajit Mahato house to Dikhardih1 |
Completion of work |
-
latitude : 23.34791798,23.34792674
Longitude : 86.59948977,86.59948205
file name : Image_14032024153036168.png
|
2024-03-14 15:30:36.247665 |
379 |
88834902 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.36003884
Longitude : 86.59971127
file name : Image_03062024165731547.png
|
2024-06-03 16:57:31.6423 |
380 |
88834902 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.35984408
Longitude : 86.59970176
file name : Image_03062024170129863.png
|
2024-06-03 17:01:29.956018 |
381 |
88834902 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.35984119
Longitude : 86.59968584
file name : Image_03062024165215061.png
|
2024-06-03 16:52:15.160672 |
382 |
88834902 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.36003858
Longitude : 86.59968392
file name : Image_03062024163450145.png
|
2024-06-03 16:34:50.269731 |
383 |
98481609 |
Creation of drainage channel for management of grey water |
245099 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.3444459
Longitude : 86.5759749
file name : Image_28072024083426524.png
|
2024-07-28 08:34:26.626622 |
384 |
98481609 |
Creation of drainage channel for management of grey water |
245099 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.3441288
Longitude : 86.57641876
file name : Image_23072024144945256.png
|
2024-07-23 14:49:45.370353 |
385 |
98481609 |
Creation of drainage channel for management of grey water |
245099 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.34409828
Longitude : 86.57640353
file name : Image_23072024145059695.png
|
2024-07-23 14:50:59.804671 |
386 |
98481609 |
Creation of drainage channel for management of grey water |
245099 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.34425666
Longitude : 86.57661384
file name : Image_28062024121953075.png
|
2024-06-28 12:19:53.169538 |
387 |
98481609 |
Creation of drainage channel for management of grey water |
245099 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.34449713
Longitude : 86.57669777
file name : Image_18062024141634294.png
|
2024-06-18 14:16:34.379195 |
388 |
98470696 |
Creation of drainage channel for management of grey water |
245099 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.32863419
Longitude : 86.59835095
file name : Image_17072024095449458.png
|
2024-07-17 09:54:49.550825 |
389 |
98470696 |
Creation of drainage channel for management of grey water |
245099 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.32863419
Longitude : 86.59835095
file name : Image_17072024095443324.png
|
2024-07-17 09:54:43.411106 |
390 |
98470696 |
Creation of drainage channel for management of grey water |
245099 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.32867007
Longitude : 86.59844991
file name : Image_17072024095438662.png
|
2024-07-17 09:54:38.750346 |
391 |
98470696 |
Creation of drainage channel for management of grey water |
245099 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.32871043
Longitude : 86.59835481
file name : Image_17072024093604858.png
|
2024-07-17 09:36:04.938977 |
392 |
98470696 |
Creation of drainage channel for management of grey water |
245099 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.3292767
Longitude : 86.59765105
file name : Image_28062024133409065.png
|
2024-06-28 13:34:09.160242 |
393 |
98470696 |
Creation of drainage channel for management of grey water |
245099 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.32864032
Longitude : 86.59853834
file name : Image_19062024123616365.png
|
2024-06-19 12:36:16.460318 |
394 |
58716783 |
Construction of Protection wall at Thakur Pukur |
120000 |
Construction of Protection wall at Thakur Pukur1 |
Plinth level |
-
latitude : 23.34344878
Longitude : 86.57286405
file name : Image_10072024093607526.png
|
2024-07-10 09:36:07.630693 |
395 |
58716783 |
Construction of Protection wall at Thakur Pukur |
120000 |
Construction of Protection wall at Thakur Pukur1 |
Plinth level |
-
latitude : 23.34347771
Longitude : 86.57288741
file name : Image_10072024092224143.png
|
2024-07-10 09:22:24.250301 |
396 |
58716783 |
Construction of Protection wall at Thakur Pukur |
120000 |
Construction of Protection wall at Thakur Pukur1 |
Plinth level |
-
latitude : 23.34343953
Longitude : 86.57284466
file name : Image_10072024085920292.png
|
2024-07-10 08:59:20.392828 |
397 |
58716783 |
Construction of Protection wall at Thakur Pukur |
120000 |
Construction of Protection wall at Thakur Pukur1 |
Plinth level |
-
latitude : 23.34343235
Longitude : 86.57269268
file name : Image_03072024130234788.png
|
2024-07-03 13:02:34.888356 |
398 |
58716783 |
Construction of Protection wall at Thakur Pukur |
120000 |
Construction of Protection wall at Thakur Pukur1 |
Completion of work |
-
latitude : 23.34342218
Longitude : 86.57294966
file name : Image_21062024114102545.png
|
2024-06-21 11:41:02.640356 |
399 |
67788966 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 23.34535967
Longitude : 86.59030094
file name : Image_02072024082450819.png
|
2024-07-02 08:24:50.906985 |
400 |
67788966 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 23.34536074
Longitude : 86.590324
file name : Image_02072024081934658.png
|
2024-07-02 08:19:34.752472 |
401 |
67788966 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.34540964
Longitude : 86.59029436
file name : Image_21062024152940066.png
|
2024-06-21 15:29:40.217625 |
402 |
58845696 |
Drinking Water tube well maintenance wage payment GP area |
100000 |
Drinking Water tube well maintenance wage payment GP area1 |
Completion of work |
-
latitude : 23.34093068
Longitude : 86.57575675
file name : Image_21062024142805178.png
|
2024-06-21 14:28:05.280008 |
403 |
67784598 |
Installation of Tubewell |
170000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 23.37251438
Longitude : 86.58483998
file name : Image_19122023145016529.png
|
2023-12-19 14:50:16.59703 |
404 |
67784598 |
Installation of Tubewell |
170000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 23.37256777
Longitude : 86.58484603
file name : Image_19122023144527059.png
|
2023-12-19 14:45:27.134657 |
405 |
67784598 |
Installation of Tubewell |
170000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.37258454
Longitude : 86.58480494
file name : Image_19122023143934532.png
|
2023-12-19 14:39:34.606099 |
406 |
67830598 |
Construction of Retaining Walls |
150000 |
Construction of Retaining Walls1 |
Roof laid |
-
latitude : 23.37280579,23.372805
Longitude : 86.59113111,86.59112717
file name : Image_06052024153943337.png
|
2024-05-06 15:39:43.440622 |
407 |
67830598 |
Construction of Retaining Walls |
150000 |
Construction of Retaining Walls1 |
Plinth level |
-
latitude : 23.37279597,23.37279597
Longitude : 86.59114532,86.59114532
file name : Image_06052024153540378.png
|
2024-05-06 15:35:40.545641 |
408 |
67830598 |
Construction of Retaining Walls |
150000 |
Construction of Retaining Walls1 |
Completion of work |
-
latitude : 23.37279209,23.37279209
Longitude : 86.59123157,86.59123157
file name : Image_06052024153010541.png
|
2024-05-06 15:30:10.636762 |
409 |
67830598 |
Construction of Retaining Walls |
150000 |
Construction of Retaining Walls1 |
Completion of work |
-
latitude : 23.37276647,23.37279068
Longitude : 86.59123388,86.59121964
file name : Image_10032024140717056.png
|
2024-03-10 14:07:17.137907 |
410 |
67788525 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 23.34537935
Longitude : 86.58874036
file name : Image_02072024083638381.png
|
2024-07-02 08:36:38.469395 |
411 |
67788525 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 23.34539116
Longitude : 86.58874386
file name : Image_02072024083827022.png
|
2024-07-02 08:38:27.147169 |
412 |
67788525 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 23.34541136
Longitude : 86.58876025
file name : Image_02072024083110151.png
|
2024-07-02 08:31:10.232564 |
413 |
67788525 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.34528756
Longitude : 86.58894228
file name : Image_21062024153706762.png
|
2024-06-21 15:37:06.861495 |
414 |
98470149 |
Creation of drainage channel for management of grey water |
245099 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.37246562
Longitude : 86.58502254
file name : Image_23092024155319012.png
|
2024-09-23 15:53:19.160596 |
415 |
98470149 |
Creation of drainage channel for management of grey water |
245099 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.37237107
Longitude : 86.58501575
file name : Image_23092024155034198.png
|
2024-09-23 15:50:33.980519 |
416 |
98470149 |
Creation of drainage channel for management of grey water |
245099 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.37244448
Longitude : 86.58501585
file name : Image_23092024154550834.png
|
2024-09-23 15:45:50.959642 |
417 |
98470149 |
Creation of drainage channel for management of grey water |
245099 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.3723995
Longitude : 86.5862061
file name : Image_23092024154152757.png
|
2024-09-23 15:41:52.695565 |
418 |
67790694 |
Drinking water facilities |
400000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 23.33701468
Longitude : 86.58087632
file name : Image_30092024134204305.png
|
2024-09-30 13:42:04.378575 |
419 |
67790694 |
Drinking water facilities |
400000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 23.33707332
Longitude : 86.58087922
file name : Image_30092024133918759.png
|
2024-09-30 13:39:18.833762 |
420 |
67790694 |
Drinking water facilities |
400000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 23.33680221
Longitude : 86.58072589
file name : Image_30092024133306494.png
|
2024-09-30 13:33:06.589889 |
421 |
67786949 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 23.32283705
Longitude : 86.60207696
file name : Image_28062024131715954.png
|
2024-06-28 13:17:16.07873 |
422 |
67786949 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 23.32285305
Longitude : 86.60211477
file name : Image_28062024131131640.png
|
2024-06-28 13:11:31.724153 |
423 |
67786949 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.32289304
Longitude : 86.60210795
file name : Image_19062024120405775.png
|
2024-06-19 12:04:05.876863 |
424 |
67785148 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 23.38401896
Longitude : 86.60832385
file name : Image_23072024180634677.png
|
2024-07-23 18:06:34.758071 |
425 |
67785148 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 23.38407348
Longitude : 86.60831306
file name : Image_23072024175701892.png
|
2024-07-23 17:57:01.98257 |
426 |
67785148 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.38407941
Longitude : 86.60834029
file name : Image_19072024170330545.png
|
2024-07-19 17:03:30.644824 |
427 |
67785148 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.3840068
Longitude : 86.60834583
file name : Image_19072024165938903.png
|
2024-07-19 16:59:39.007498 |
428 |
67785148 |
Installation of Tubewell |
85000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 23.38403199
Longitude : 86.60834951
file name : Image_19072024165829348.png
|
2024-07-19 16:58:29.442871 |
429 |
98481920 |
Creation of drainage channel for management of grey water |
245099 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.37944696
Longitude : 86.60835847
file name : Image_16082024163444527.png
|
2024-08-16 16:34:44.614468 |
430 |
98481920 |
Creation of drainage channel for management of grey water |
245099 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.37944791
Longitude : 86.60835917
file name : Image_16082024163358766.png
|
2024-08-16 16:33:58.840845 |
431 |
98481920 |
Creation of drainage channel for management of grey water |
245099 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.3793896
Longitude : 86.60869534
file name : Image_16082024162939529.png
|
2024-08-16 16:29:39.620054 |
432 |
98481920 |
Creation of drainage channel for management of grey water |
245099 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.37943179
Longitude : 86.60833542
file name : Image_16082024162510765.png
|
2024-08-16 16:25:10.856593 |
433 |
67830272 |
Construction of Retaining Walls |
150000 |
Construction of Retaining Walls1 |
Roof laid |
-
latitude : 23.36922239,23.36937639
Longitude : 86.58455425,86.58455959
file name : Image_05022024142406741.png
|
2024-02-05 14:24:06.807817 |
434 |
67830272 |
Construction of Retaining Walls |
150000 |
Construction of Retaining Walls1 |
Plinth level |
-
latitude : 23.36926903,23.36917581
Longitude : 86.58451546,86.58470948
file name : Image_05022024141853250.png
|
2024-02-05 14:18:53.319778 |
435 |
67830272 |
Construction of Retaining Walls |
150000 |
Construction of Retaining Walls1 |
Plinth level |
-
latitude : 23.36918471,23.36919291
Longitude : 86.58473012,86.58474122
file name : Image_05022024134800626.png
|
2024-02-05 13:48:00.705158 |
436 |
67830272 |
Construction of Retaining Walls |
150000 |
Construction of Retaining Walls1 |
Completion of work |
-
latitude : 23.36935339,23.36922248
Longitude : 86.58462126,86.58472405
file name : Image_05022024134140854.png
|
2024-02-05 13:41:40.937222 |
437 |
107098704 |
Construction and Maintenance of Community Centre |
80000 |
Construction and Maintenance of Community Centre1 |
Roof laid |
-
latitude : 23.37247102
Longitude : 86.59212508
file name : Image_16112024102953753.png
|
2024-11-16 10:29:53.834986 |
438 |
107098704 |
Construction and Maintenance of Community Centre |
80000 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 23.37244612
Longitude : 86.59213453
file name : Image_16112024102654688.png
|
2024-11-16 10:26:54.774668 |
439 |
107098704 |
Construction and Maintenance of Community Centre |
80000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 23.37251761
Longitude : 86.59207269
file name : Image_16112024102405844.png
|
2024-11-16 10:24:05.932842 |