1 |
34910967 |
Construction of Bandhaghat at Bura Bandh at Selani |
100000 |
Construction of Bandhaghat at Bura Bandh at Selani1 |
Plinth level |
-
latitude : 23.443733523599803
Longitude : 86.19874597527087
file name : Image_30062021163119307.png
|
2021-06-30 16:31:19.40165 |
2 |
34910967 |
Construction of Bandhaghat at Bura Bandh at Selani |
100000 |
Construction of Bandhaghat at Bura Bandh at Selani1 |
Roof laid |
-
latitude : 23.43485398683697
Longitude : 86.19647305458784
file name : Image_14072021151130546.png
|
2021-07-14 15:11:30.641714 |
3 |
34910967 |
Construction of Bandhaghat at Bura Bandh at Selani |
100000 |
Construction of Bandhaghat at Bura Bandh at Selani1 |
Completion of work |
-
latitude : 23.423274806700647
Longitude : 86.22751593589783
file name : Image_08062021124435600.png
|
2021-06-08 12:44:35.680926 |
4 |
39067453 |
Construction of Drain from house of Dharani Kumar to Upar Bandh |
50000 |
Construction of Drain from house of Dharani Kumar to Upar Bandh1 |
Completion of work |
-
latitude : 23.450087886303663,23.450103267095983
Longitude : 86.23604024760425,86.23585500754416
file name : Image_12022021171955375.png
|
2021-02-12 17:19:55.468882 |
5 |
39067453 |
Construction of Drain from house of Dharani Kumar to Upar Bandh |
50000 |
Construction of Drain from house of Dharani Kumar to Upar Bandh1 |
Plinth level |
-
latitude : 23.450089395046234,23.450096687301993
Longitude : 86.23606421984732,86.23590102419257
file name : Image_01032021165613154.png
|
2021-03-01 16:56:13.238807 |
6 |
39067453 |
Construction of Drain from house of Dharani Kumar to Upar Bandh |
50000 |
Construction of Drain from house of Dharani Kumar to Upar Bandh1 |
Roof laid |
-
latitude : 23.450092831626534,23.450104189105332
Longitude : 86.2360221426934,86.2358907982707
file name : Image_07052021125303507.png
|
2021-05-07 12:53:03.588223 |
7 |
34936525 |
Construction of Bandhaghat at Dalahi Bandh in Gunja in Plot NO. 2570 |
90000 |
Construction of Bandhaghat at Dalahi Bandh in Gunja in Plot NO. 25701 |
Roof laid |
-
latitude : 23.4232815541327
Longitude : 86.22741711325943
file name : Image_02102021172022235.png
|
2021-10-02 17:20:22.322676 |
8 |
34936525 |
Construction of Bandhaghat at Dalahi Bandh in Gunja in Plot NO. 2570 |
90000 |
Construction of Bandhaghat at Dalahi Bandh in Gunja in Plot NO. 25701 |
Plinth level |
-
latitude : 23.423237213864923
Longitude : 86.22742658481002
file name : Image_18092021162354743.png
|
2021-09-18 16:23:54.833426 |
9 |
34936525 |
Construction of Bandhaghat at Dalahi Bandh in Gunja in Plot NO. 2570 |
90000 |
Construction of Bandhaghat at Dalahi Bandh in Gunja in Plot NO. 25701 |
Completion of work |
-
latitude : 23.4233212005347
Longitude : 86.22753001749516
file name : Image_08062021115509039.png
|
2021-06-08 11:55:09.125537 |
10 |
34750530 |
Construction of Bandhaghat at Bhursu Bandh at Hargara |
180000 |
Construction of Bandhaghat at Bhursu Bandh at Hargara1 |
Roof laid |
-
latitude : 23.444948690012097
Longitude : 86.16711418144405
file name : Image_16072022140105414.png
|
2022-07-16 14:01:05.500754 |
11 |
34750530 |
Construction of Bandhaghat at Bhursu Bandh at Hargara |
180000 |
Construction of Bandhaghat at Bhursu Bandh at Hargara1 |
Plinth level |
-
latitude : 23.4448794554919
Longitude : 86.16714737378061
file name : Image_16052022083425123.png
|
2022-05-16 08:34:25.241916 |
12 |
34750530 |
Construction of Bandhaghat at Bhursu Bandh at Hargara |
180000 |
Construction of Bandhaghat at Bhursu Bandh at Hargara1 |
Completion of work |
-
latitude : 23.44489219598472
Longitude : 86.16712750867009
file name : Image_09042022182544382.png
|
2022-04-09 18:25:44.479838 |
13 |
34895096 |
Construction of Bandhaghat at Shiv Mandir Garia at Silfor |
130000 |
Construction of Bandhaghat at Shiv Mandir Garia at Silfor1 |
Roof laid |
-
latitude : 23.441899144090712
Longitude : 86.18147347122431
file name : Image_07052022115609364.png
|
2022-05-07 11:56:09.472444 |
14 |
34895096 |
Construction of Bandhaghat at Shiv Mandir Garia at Silfor |
130000 |
Construction of Bandhaghat at Shiv Mandir Garia at Silfor1 |
Plinth level |
-
latitude : 23.441901658661664
Longitude : 86.18145989254117
file name : Image_24042022105325473.png
|
2022-04-24 10:53:25.585897 |
15 |
34895096 |
Construction of Bandhaghat at Shiv Mandir Garia at Silfor |
130000 |
Construction of Bandhaghat at Shiv Mandir Garia at Silfor1 |
Completion of work |
-
latitude : 23.44183866865933
Longitude : 86.18143198080361
file name : Image_20032022111359455.png
|
2022-03-20 11:13:59.546401 |
16 |
39051594 |
Installation of Tubewell with solid Platform and soak pit at Namo Kuli in Durma |
100000 |
Installation of Tubewell with solid Platform and soak pit at Namo Kuli in Durma1 |
Plinth level |
-
latitude : 23.44121685717255
Longitude : 86.19297134689987
file name : Image_19022022151749027.png
|
2022-02-19 15:17:49.161541 |
17 |
39051594 |
Installation of Tubewell with solid Platform and soak pit at Namo Kuli in Durma |
100000 |
Installation of Tubewell with solid Platform and soak pit at Namo Kuli in Durma1 |
Completion of work |
-
latitude : 23.43497397378087
Longitude : 86.18260653689504
file name : Image_04022022142613656.png
|
2022-02-04 14:26:13.748818 |
18 |
34909866 |
Construction of Bandhaghat at Teli Bandh at Chaitandih |
150000 |
Construction of Bandhaghat at Teli Bandh at Chaitandih1 |
Roof laid |
-
latitude : 23.439074610359967
Longitude : 86.19733278639615
file name : Image_16072022130528812.png
|
2022-07-16 13:05:28.885898 |
19 |
34909866 |
Construction of Bandhaghat at Teli Bandh at Chaitandih |
150000 |
Construction of Bandhaghat at Teli Bandh at Chaitandih1 |
Plinth level |
-
latitude : 23.4390503866598
Longitude : 86.19733856990933
file name : Image_22052022112434682.png
|
2022-05-22 11:24:34.776427 |
20 |
34909866 |
Construction of Bandhaghat at Teli Bandh at Chaitandih |
150000 |
Construction of Bandhaghat at Teli Bandh at Chaitandih1 |
Completion of work |
-
latitude : 23.43898098450154
Longitude : 86.19726673699915
file name : Image_19032022114201169.png
|
2022-03-19 11:42:01.284838 |
21 |
34908133 |
Construction of Banchaghat at Gusai Bandh at Selani |
150000 |
Construction of Banchaghat at Gusai Bandh at Selani1 |
Plinth level |
-
latitude : 23.441099259071052
Longitude : 86.19389092549682
file name : Image_09042022164024628.png
|
2022-04-09 16:40:24.795722 |
22 |
34908133 |
Construction of Banchaghat at Gusai Bandh at Selani |
150000 |
Construction of Banchaghat at Gusai Bandh at Selani1 |
Roof laid |
-
latitude : 23.441094649024308
Longitude : 86.19388723745942
file name : Image_06052022100539474.png
|
2022-05-06 10:05:39.604091 |
23 |
34908133 |
Construction of Banchaghat at Gusai Bandh at Selani |
150000 |
Construction of Banchaghat at Gusai Bandh at Selani1 |
Completion of work |
-
latitude : 23.440928142517805
Longitude : 86.1937589943409
file name : Image_12032022130949533.png
|
2022-03-12 13:09:49.64311 |
24 |
39067790 |
Installation of Tubewell with solid Platform and soak pit near house of Ashari Mahato in Manakchita |
100000 |
Installation of Tubewell with solid Platform and soak pit near house of Ashari Mahato in Manakchita1 |
Plinth level |
-
latitude : 23.452083240263164
Longitude : 86.21748036704957
file name : Image_14022022165456299.png
|
2022-02-14 16:54:56.428238 |
25 |
39067790 |
Installation of Tubewell with solid Platform and soak pit near house of Ashari Mahato in Manakchita |
100000 |
Installation of Tubewell with solid Platform and soak pit near house of Ashari Mahato in Manakchita1 |
Roof laid |
-
latitude : 23.44379630405456
Longitude : 86.229791874066
file name : Image_19022022161217963.png
|
2022-02-19 16:12:18.062393 |
26 |
39067790 |
Installation of Tubewell with solid Platform and soak pit near house of Ashari Mahato in Manakchita |
100000 |
Installation of Tubewell with solid Platform and soak pit near house of Ashari Mahato in Manakchita1 |
Completion of work |
-
latitude : 23.443763530813158
Longitude : 86.2297292612493
file name : Image_26012022121155274.png
|
2022-01-26 12:11:55.375331 |
27 |
34917615 |
Construction of Bandhaghat at Napit Bandh at Ramamoti |
280000 |
Construction of Bandhaghat at Napit Bandh at Ramamoti1 |
Roof laid |
-
latitude : 23.432776113040745
Longitude : 86.2090211827308
file name : Image_09072022125510637.png
|
2022-07-09 12:55:10.728832 |
28 |
34917615 |
Construction of Bandhaghat at Napit Bandh at Ramamoti |
280000 |
Construction of Bandhaghat at Napit Bandh at Ramamoti1 |
Plinth level |
-
latitude : 23.432836337015033
Longitude : 86.20896368287504
file name : Image_09042022170534258.png
|
2022-04-09 17:05:34.352282 |
29 |
34917615 |
Construction of Bandhaghat at Napit Bandh at Ramamoti |
280000 |
Construction of Bandhaghat at Napit Bandh at Ramamoti1 |
Completion of work |
-
latitude : 23.432783824391663
Longitude : 86.2089744117111
file name : Image_19032022112345206.png
|
2022-03-19 11:23:45.317747 |
30 |
34759423 |
Installation of Tubewell with solid platforma and soak pit at Bheria Gathar Tard near Mahali Bandh |
100000 |
Installation of Tubewell with solid platforma and soak pit at Bheria Gathar Tard near Mahali Bandh1 |
Roof laid |
-
latitude : 23.457585792057216
Longitude : 86.17398683913052
file name : Image_26012022173548238.png
|
2022-01-26 17:35:48.340448 |
31 |
34759423 |
Installation of Tubewell with solid platforma and soak pit at Bheria Gathar Tard near Mahali Bandh |
100000 |
Installation of Tubewell with solid platforma and soak pit at Bheria Gathar Tard near Mahali Bandh1 |
Completion of work |
-
latitude : 23.457530429586768
Longitude : 86.17396001704037
file name : Image_26122021162543396.png
|
2021-12-26 16:25:43.49965 |
32 |
34759423 |
Installation of Tubewell with solid platforma and soak pit at Bheria Gathar Tard near Mahali Bandh |
100000 |
Installation of Tubewell with solid platforma and soak pit at Bheria Gathar Tard near Mahali Bandh1 |
Plinth level |
-
latitude : 23.457483197562397
Longitude : 86.17398491129279
file name : Image_07012022170554044.png
|
2022-01-07 17:05:54.16433 |
33 |
66509248 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.44917350448668
Longitude : 86.21186004951596
file name : Image_10042023161155742.png
|
2023-04-10 16:11:55.826546 |
34 |
66509248 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.449109718203545
Longitude : 86.21188058517873
file name : Image_14032023171441261.png
|
2023-03-14 17:14:41.35284 |
35 |
66509248 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.449103138409555
Longitude : 86.21190061792731
file name : Image_22022023115634273.png
|
2023-02-22 11:56:34.360915 |
36 |
57775651 |
Repairing of Sakhar Bharat School in Baragram |
200000 |
Repairing of Sakhar Bharat School in Baragram1 |
Roof laid |
-
latitude : 23.44268507324159
Longitude : 86.22027824632823
file name : Image_15102023114951788.png
|
2023-10-15 11:49:51.885972 |
37 |
57775651 |
Repairing of Sakhar Bharat School in Baragram |
200000 |
Repairing of Sakhar Bharat School in Baragram1 |
Plinth level |
-
latitude : 23.44265829306096
Longitude : 86.22033440507948
file name : Image_30072023174557218.png
|
2023-07-30 17:45:57.307468 |
38 |
57775651 |
Repairing of Sakhar Bharat School in Baragram |
200000 |
Repairing of Sakhar Bharat School in Baragram1 |
Completion of work |
-
latitude : 23.44265917316079
Longitude : 86.22030783444643
file name : Image_12062023173140786.png
|
2023-06-12 17:31:40.88376 |
39 |
39053372 |
Installation of Tubewell with solid Platform and soak pit near Harimandir in Kusumtikri |
100000 |
Installation of Tubewell with solid Platform and soak pit near Harimandir in Kusumtikri1 |
Roof laid |
-
latitude : 23.42739895451814
Longitude : 86.18436648510396
file name : Image_28012022114308740.png
|
2022-01-28 11:43:08.859657 |
40 |
39053372 |
Installation of Tubewell with solid Platform and soak pit near Harimandir in Kusumtikri |
100000 |
Installation of Tubewell with solid Platform and soak pit near Harimandir in Kusumtikri1 |
Completion of work |
-
latitude : 23.427408887073398
Longitude : 86.18440562859178
file name : Image_30122021134738409.png
|
2021-12-30 13:47:38.53264 |
41 |
39053372 |
Installation of Tubewell with solid Platform and soak pit near Harimandir in Kusumtikri |
100000 |
Installation of Tubewell with solid Platform and soak pit near Harimandir in Kusumtikri1 |
Plinth level |
-
latitude : 23.427380304783583
Longitude : 86.1843195464462
file name : Image_12012022152700509.png
|
2022-01-12 15:27:00.606439 |
42 |
39053372 |
Installation of Tubewell with solid Platform and soak pit near Harimandir in Kusumtikri |
100000 |
Installation of Tubewell with solid Platform and soak pit near Harimandir in Kusumtikri1 |
Plinth level |
-
latitude : 23.4273689892143
Longitude : 86.18436832912266
file name : Image_12012022152938479.png
|
2022-01-12 15:29:38.575015 |
43 |
39051195 |
Installation of Tubewell with solid Platform and soak pit near Mahatodih at Hargara |
100000 |
Installation of Tubewell with solid Platform and soak pit near Mahatodih at Hargara1 |
Roof laid |
-
latitude : 23.42294070404023
Longitude : 86.23001726344228
file name : Image_12022022141549106.png
|
2022-02-12 14:15:49.213618 |
44 |
39051195 |
Installation of Tubewell with solid Platform and soak pit near Mahatodih at Hargara |
100000 |
Installation of Tubewell with solid Platform and soak pit near Mahatodih at Hargara1 |
Plinth level |
-
latitude : 23.447852432727814
Longitude : 86.17077372036874
file name : Image_04022022165655826.png
|
2022-02-04 16:56:55.936018 |
45 |
39051195 |
Installation of Tubewell with solid Platform and soak pit near Mahatodih at Hargara |
100000 |
Installation of Tubewell with solid Platform and soak pit near Mahatodih at Hargara1 |
Completion of work |
-
latitude : 23.447826448827982
Longitude : 86.17079199291766
file name : Image_26012022171300749.png
|
2022-01-26 17:13:00.838351 |
46 |
39068680 |
Installation of Tubewell with solid Platform and soak pit near Paklaha Bandh in Agharpur |
100000 |
Installation of Tubewell with solid Platform and soak pit near Paklaha Bandh in Agharpur1 |
Plinth level |
-
latitude : 23.427193849347532
Longitude : 86.20292535983026
file name : Image_06102021101626548.png
|
2021-10-06 10:16:26.627682 |
47 |
39068680 |
Installation of Tubewell with solid Platform and soak pit near Paklaha Bandh in Agharpur |
100000 |
Installation of Tubewell with solid Platform and soak pit near Paklaha Bandh in Agharpur1 |
Completion of work |
-
latitude : 23.427161118015647
Longitude : 86.20298394933343
file name : Image_18092021165442299.png
|
2021-09-18 16:54:42.413835 |
48 |
39051794 |
Installation of Tubewell with solid Platform and soak pit near Dharanidhar Mahato land at Kusumtikri |
100000 |
Installation of Tubewell with solid Platform and soak pit near Dharanidhar Mahato land at Kusumtikri1 |
Plinth level |
-
latitude : 23.426875798031688
Longitude : 86.1831384524703
file name : Image_06102021102945583.png
|
2021-10-06 10:29:45.698359 |
49 |
39051794 |
Installation of Tubewell with solid Platform and soak pit near Dharanidhar Mahato land at Kusumtikri |
100000 |
Installation of Tubewell with solid Platform and soak pit near Dharanidhar Mahato land at Kusumtikri1 |
Completion of work |
-
latitude : 23.426880449987948
Longitude : 86.18317047134042
file name : Image_19092021163745188.png
|
2021-09-19 16:37:45.278269 |
50 |
39067683 |
Installation of Tubewell with solid Platform and soak pit near Rashir Bandh in Baragram |
100000 |
Installation of Tubewell with solid Platform and soak pit near Rashir Bandh in Baragram1 |
Plinth level |
-
latitude : 23.440290866419673
Longitude : 86.22249450534582
file name : Image_08082021184004082.png
|
2021-08-08 18:40:04.183008 |
51 |
39067683 |
Installation of Tubewell with solid Platform and soak pit near Rashir Bandh in Baragram |
100000 |
Installation of Tubewell with solid Platform and soak pit near Rashir Bandh in Baragram1 |
Completion of work |
-
latitude : 23.440301762893796
Longitude : 86.22254664078355
file name : Image_22062021181117579.png
|
2021-06-22 18:11:17.645112 |
52 |
34883687 |
Installation of Tubewell with solid platforma and soak pit near Dasharath Mahato House at Selani |
100000 |
Installation of Tubewell with solid platforma and soak pit near Dasharath Mahato House at Selani 1 |
Completion of work |
-
latitude : 23.44642956275493
Longitude : 86.19715919718146
file name : Image_30102021171849716.png
|
2021-10-30 17:18:49.793447 |
53 |
34751725 |
Construction of PCC from Khayer Garah to Nawabandh at Hargara |
90000 |
Construction of PCC from Khayer Garah to Nawabandh at Hargara1 |
Plinth level |
-
latitude : 23.438954330049455,23.447170229628682
Longitude : 86.21645643375814,86.16545339114964
file name : Image_08022021135819032.png
|
2021-02-08 13:58:19.128582 |
54 |
34751725 |
Construction of PCC from Khayer Garah to Nawabandh at Hargara |
90000 |
Construction of PCC from Khayer Garah to Nawabandh at Hargara1 |
Completion of work |
-
latitude : 23.447161470539868,23.44694098457694
Longitude : 86.16543922573328,86.16548943333328
file name : Image_03022021164511610.png
|
2021-02-03 16:45:11.723301 |
55 |
34751725 |
Construction of PCC from Khayer Garah to Nawabandh at Hargara |
90000 |
Construction of PCC from Khayer Garah to Nawabandh at Hargara1 |
Roof laid |
-
latitude : 23.44697732012719,23.447125512175262
Longitude : 86.16546219214797,86.1654350347817
file name : Image_12022021164457485.png
|
2021-02-12 16:44:57.587302 |
56 |
34751725 |
Construction of PCC from Khayer Garah to Nawabandh at Hargara |
90000 |
Construction of PCC from Khayer Garah to Nawabandh at Hargara1 |
Completion of work |
-
latitude : 23.446916886605322,23.447152501903474
Longitude : 86.16548281162977,86.16543545387685
file name : Image_03022021164813833.png
|
2021-02-03 16:48:13.943725 |
57 |
39060340 |
Construction of Drain from Gosai Bandh to Bauri Para in Ramamoti |
50000 |
Construction of Drain from Gosai Bandh to Bauri Para in Ramamoti1 |
Roof laid |
-
latitude : 23.434580988250673,23.43470625579357
Longitude : 86.2049417104572,86.20487767271698
file name : Image_08082021182312365.png
|
2021-08-08 18:23:12.459252 |
58 |
39060340 |
Construction of Drain from Gosai Bandh to Bauri Para in Ramamoti |
50000 |
Construction of Drain from Gosai Bandh to Bauri Para in Ramamoti1 |
Plinth level |
-
latitude : 23.434569337405264,23.434688444249332
Longitude : 86.20496501214802,86.20488479733467
file name : Image_14072021161318454.png
|
2021-07-14 16:13:18.548666 |
59 |
39060340 |
Construction of Drain from Gosai Bandh to Bauri Para in Ramamoti |
50000 |
Construction of Drain from Gosai Bandh to Bauri Para in Ramamoti1 |
Completion of work |
-
latitude : 23.43454306013882,23.434794601053
Longitude : 86.2049765791744,86.20478756725788
file name : Image_10062021151343546.png
|
2021-06-10 15:13:43.634709 |
60 |
47149156 |
Construction of Bathing Ghat with dustbin at Nitai Bandh in Balibhasa |
150000 |
Construction of Bathing Ghat with dustbin at Nitai Bandh in Balibhasa1 |
Roof laid |
-
latitude : 23.43503470066935
Longitude : 86.17372255772352
file name : Image_08042023093020330.png
|
2023-04-08 09:30:20.397943 |
61 |
47149156 |
Construction of Bathing Ghat with dustbin at Nitai Bandh in Balibhasa |
150000 |
Construction of Bathing Ghat with dustbin at Nitai Bandh in Balibhasa1 |
Plinth level |
-
latitude : 23.435033317655325
Longitude : 86.17375541478395
file name : Image_26032023092210325.png
|
2023-03-26 09:22:10.413556 |
62 |
47149156 |
Construction of Bathing Ghat with dustbin at Nitai Bandh in Balibhasa |
150000 |
Construction of Bathing Ghat with dustbin at Nitai Bandh in Balibhasa1 |
Completion of work |
-
latitude : 23.435043208301067
Longitude : 86.17379757575691
file name : Image_12032023101010684.png
|
2023-03-12 10:10:10.762201 |
63 |
57774959 |
PCC Road on Baragaram Darir Bandh Road |
100000 |
PCC Road on Baragaram Darir Bandh Road1 |
Roof laid |
-
latitude : 23.44045653473586,23.440335039049387
Longitude : 86.21959713287652,86.21954374015331
file name : Image_22042023115351579.png
|
2023-04-22 11:53:51.682782 |
64 |
57774959 |
PCC Road on Baragaram Darir Bandh Road |
100000 |
PCC Road on Baragaram Darir Bandh Road1 |
Plinth level |
-
latitude : 23.4407456,23.440260984934866
Longitude : 86.2196405,86.21956779621542
file name : Image_20042023110046210.png
|
2023-04-20 11:00:46.316911 |
65 |
57774959 |
PCC Road on Baragaram Darir Bandh Road |
100000 |
PCC Road on Baragaram Darir Bandh Road1 |
Completion of work |
-
latitude : 23.440460432320833,23.440298535861075
Longitude : 86.21957668103278,86.21954415924847
file name : Image_22022023113343626.png
|
2023-02-22 11:33:43.705624 |
66 |
57775207 |
PCC Road at Mahato Para in Baragram |
100000 |
PCC Road at Mahato Para in Baragram1 |
Roof laid |
-
latitude : 23.441312494687736,23.441378250718117
Longitude : 86.22028637677431,86.22008412145078
file name : Image_22042023115708871.png
|
2023-04-22 11:57:08.985503 |
67 |
57775207 |
PCC Road at Mahato Para in Baragram |
100000 |
PCC Road at Mahato Para in Baragram1 |
Plinth level |
-
latitude : 23.44132276251912,23.44140008557588
Longitude : 86.22028201818466,86.22003098018467
file name : Image_18042023131810330.png
|
2023-04-18 13:18:10.398781 |
68 |
57775207 |
PCC Road at Mahato Para in Baragram |
100000 |
PCC Road at Mahato Para in Baragram1 |
Completion of work |
-
latitude : 23.44132096040994,23.441393631510437
Longitude : 86.22019610367715,86.22009451501071
file name : Image_22022023091819267.png
|
2023-02-22 09:18:19.340188 |
69 |
57957643 |
Tube well with soak pit and solid platform near Maniram Mahato house in Hargara |
76000 |
Tube well with soak pit and solid platform near Maniram Mahato house in Hargara1 |
Roof laid |
-
latitude : 23.44699156936258
Longitude : 86.17176873609424
file name : Image_05082023183207517.png
|
2023-08-05 18:32:07.604445 |
70 |
57957643 |
Tube well with soak pit and solid platform near Maniram Mahato house in Hargara |
76000 |
Tube well with soak pit and solid platform near Maniram Mahato house in Hargara1 |
Plinth level |
-
latitude : 23.446946809999645
Longitude : 86.17178533226252
file name : Image_04082023175551927.png
|
2023-08-04 17:55:52.023007 |
71 |
57957643 |
Tube well with soak pit and solid platform near Maniram Mahato house in Hargara |
76000 |
Tube well with soak pit and solid platform near Maniram Mahato house in Hargara1 |
Plinth level |
-
latitude : 23.446988803334534
Longitude : 86.171844759956
file name : Image_04082023182138813.png
|
2023-08-04 18:21:38.914545 |
72 |
57957643 |
Tube well with soak pit and solid platform near Maniram Mahato house in Hargara |
76000 |
Tube well with soak pit and solid platform near Maniram Mahato house in Hargara1 |
Completion of work |
-
latitude : 23.446986582130194
Longitude : 86.17179572582245
file name : Image_30072023165330528.png
|
2023-07-30 16:53:30.619729 |
73 |
39067118 |
Installation of Tubewell with solid Platform and soak pit near house of Bhishma Kumar at Kokiara |
100000 |
Installation of Tubewell with solid Platform and soak pit near house of Bhishma Kumar at Kokiara1 |
Completion of work |
-
latitude : 23.45106383319944
Longitude : 86.23578870669007
file name : Image_30102021165542878.png
|
2021-10-30 16:55:42.998938 |
74 |
34941070 |
Construction of PCC Road from Parikshit MahatoHouse to Mati Sahis House at Agharpur |
100000 |
Construction of PCC Road from Parikshit MahatoHouse to Mati Sahis House at Agharpur1 |
Plinth level |
-
latitude : 23.425064804032445,23.42508123256266
Longitude : 86.20318369008601,86.20309257879853
file name : Image_02102021170140771.png
|
2021-10-02 17:01:40.848191 |
75 |
34941070 |
Construction of PCC Road from Parikshit MahatoHouse to Mati Sahis House at Agharpur |
100000 |
Construction of PCC Road from Parikshit MahatoHouse to Mati Sahis House at Agharpur1 |
Completion of work |
-
latitude : 23.42497884761542,23.42503814958036
Longitude : 86.20324462652206,86.20311344973743
file name : Image_18092021164202185.png
|
2021-09-18 16:42:02.301615 |
76 |
66509468 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.436890873126686
Longitude : 86.1929423455149
file name : Image_05062023143255340.png
|
2023-06-05 14:32:55.438716 |
77 |
66509468 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.436923059634864
Longitude : 86.19296036660671
file name : Image_23042023090319688.png
|
2023-04-23 09:03:19.78277 |
78 |
66509468 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.436957760713995
Longitude : 86.19292893446982
file name : Image_11042023074329727.png
|
2023-04-11 07:43:29.809522 |
79 |
34903129 |
Construction of PCC from sunil Mahato House to Makreswar Mahato House at Kusumtikri |
80000 |
Construction of PCC from sunil Mahato House to Makreswar Mahato House at Kusumtikri1 |
Plinth level |
-
latitude : 23.42782236635685,23.42778716236353
Longitude : 86.18555503897369,86.18565696291625
file name : Image_08082021173215290.png
|
2021-08-08 17:32:15.435733 |
80 |
34903129 |
Construction of PCC from sunil Mahato House to Makreswar Mahato House at Kusumtikri |
80000 |
Construction of PCC from sunil Mahato House to Makreswar Mahato House at Kusumtikri1 |
Completion of work |
-
latitude : 23.427781630307436,23.42775447294116
Longitude : 86.18556350469589,86.18574145250022
file name : Image_19022021151639091.png
|
2021-02-19 15:16:39.208363 |
81 |
66509500 |
Creation of community soak pits for group of Households |
25000 |
Creation of community soak pits for group of Households1 |
Roof laid |
-
latitude : 23.43796509783715
Longitude : 86.19512474164367
file name : Image_22042023110828444.png
|
2023-04-22 11:08:28.523277 |
82 |
66509500 |
Creation of community soak pits for group of Households |
25000 |
Creation of community soak pits for group of Households1 |
Plinth level |
-
latitude : 23.437891462817788
Longitude : 86.19510613381863
file name : Image_22032023140940161.png
|
2023-03-22 14:09:40.235766 |
83 |
66509500 |
Creation of community soak pits for group of Households |
25000 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 23.437958140857518
Longitude : 86.19513421319425
file name : Image_24022023093934705.png
|
2023-02-24 09:39:34.780186 |
84 |
57958962 |
Tube well with soak pit and solid platform at Nich kuli Bansh Bgan in Bhelaidh |
76000 |
Tube well with soak pit and solid platform at Nich kuli Bansh Bgan in Bhelaidh1 |
Roof laid |
-
latitude : 23.42034566681832
Longitude : 86.17023400962353
file name : Image_31082023100320514.png
|
2023-08-31 10:03:20.6098 |
85 |
57958962 |
Tube well with soak pit and solid platform at Nich kuli Bansh Bgan in Bhelaidh |
76000 |
Tube well with soak pit and solid platform at Nich kuli Bansh Bgan in Bhelaidh1 |
Plinth level |
-
latitude : 23.420295123942196
Longitude : 86.17023660801351
file name : Image_08082023192227704.png
|
2023-08-08 19:22:27.801009 |
86 |
57958962 |
Tube well with soak pit and solid platform at Nich kuli Bansh Bgan in Bhelaidh |
76000 |
Tube well with soak pit and solid platform at Nich kuli Bansh Bgan in Bhelaidh1 |
Completion of work |
-
latitude : 23.420227775350213
Longitude : 86.17024473845959
file name : Image_07082023174730965.png
|
2023-08-07 17:47:31.069415 |
87 |
39081154 |
Tubewell maintenance expenses water cooler |
410760 |
Tubewell maintenance expenses water cooler1 |
Completion of work |
-
latitude : 23.4388096
Longitude : 86.2163858
file name : Image_31082021163316041.png
|
2021-08-31 16:33:16.137808 |
88 |
66522105 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.431594683788717
Longitude : 86.19786822237074
file name : Image_26032023090301347.png
|
2023-03-26 09:03:01.427537 |
89 |
66522105 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.431638688780367
Longitude : 86.19792429730296
file name : Image_20032023144912978.png
|
2023-03-20 14:49:13.051009 |
90 |
66522105 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.43169300351292
Longitude : 86.19790652766824
file name : Image_22022023180151413.png
|
2023-02-22 18:01:51.494566 |
91 |
66509530 |
Creation of community soak pits for group of Households |
25000 |
Creation of community soak pits for group of Households1 |
Roof laid |
-
latitude : 23.434973848052323
Longitude : 86.19553034193814
file name : Image_22042023111541655.png
|
2023-04-22 11:15:41.743339 |
92 |
66509530 |
Creation of community soak pits for group of Households |
25000 |
Creation of community soak pits for group of Households1 |
Plinth level |
-
latitude : 23.434948408976197
Longitude : 86.19550972245634
file name : Image_22032023141436066.png
|
2023-03-22 14:14:36.162934 |
93 |
66509530 |
Creation of community soak pits for group of Households |
25000 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 23.4349663881585
Longitude : 86.19551508687437
file name : Image_24022023094524143.png
|
2023-02-24 09:45:24.228813 |
94 |
34926847 |
Construction of Protection Wall at Rajwar Para in side of Khagen Dey Land at Baragram |
130000 |
Construction of Protection Wall at Rajwar Para in side of Khagen Dey Land at Baragram1 |
Roof laid |
-
latitude : 23.443602807819843,23.443712946027517
Longitude : 86.21948146261275,86.21949001215398
file name : Image_12022022161126576.png
|
2022-02-12 16:11:26.683596 |
95 |
34926847 |
Construction of Protection Wall at Rajwar Para in side of Khagen Dey Land at Baragram |
130000 |
Construction of Protection Wall at Rajwar Para in side of Khagen Dey Land at Baragram1 |
Plinth level |
-
latitude : 23.443574435077608,23.443715586327016
Longitude : 86.21956972405314,86.21954072266817
file name : Image_04022022154337432.png
|
2022-02-04 15:43:37.547647 |
96 |
34926847 |
Construction of Protection Wall at Rajwar Para in side of Khagen Dey Land at Baragram |
130000 |
Construction of Protection Wall at Rajwar Para in side of Khagen Dey Land at Baragram1 |
Completion of work |
-
latitude : 23.443558677099645,23.443682100623846
Longitude : 86.21951825916767,86.21954306960106
file name : Image_26012022114523077.png
|
2022-01-26 11:45:23.197308 |
97 |
34886850 |
Installation of Tube well with solid platform and soak pit at Balibhasa dih |
100000 |
Installation of Tube well with solid platform and soak pit at Balibhasa dih1 |
Plinth level |
-
latitude : 23.435919075272977
Longitude : 86.17198951542377
file name : Image_08082021175129312.png
|
2021-08-08 17:51:29.436045 |
98 |
34886850 |
Installation of Tube well with solid platform and soak pit at Balibhasa dih |
100000 |
Installation of Tube well with solid platform and soak pit at Balibhasa dih1 |
Completion of work |
-
latitude : 23.435933995060623
Longitude : 86.17201080545783
file name : Image_14072021153300221.png
|
2021-07-14 15:33:00.323669 |
99 |
34891699 |
Installation of Tubewell with solid platform and soak pit near Tarani Kalindi House at Silfor |
100000 |
Installation of Tubewell with solid platform and soak pit near Tarani Kalindi House at Silfor1 |
Plinth level |
-
latitude : 23.443505368195474
Longitude : 86.17829421535134
file name : Image_26012022170037725.png
|
2022-01-26 17:00:37.839798 |
100 |
34891699 |
Installation of Tubewell with solid platform and soak pit near Tarani Kalindi House at Silfor |
100000 |
Installation of Tubewell with solid platform and soak pit near Tarani Kalindi House at Silfor1 |
Completion of work |
-
latitude : 23.44347808510065
Longitude : 86.17829320952296
file name : Image_07012022163553970.png
|
2022-01-07 16:35:54.082559 |
101 |
34891699 |
Installation of Tubewell with solid platform and soak pit near Tarani Kalindi House at Silfor |
100000 |
Installation of Tubewell with solid platform and soak pit near Tarani Kalindi House at Silfor1 |
Plinth level |
-
latitude : 23.443531855009496
Longitude : 86.17826957255602
file name : Image_12012022141623746.png
|
2022-01-12 14:16:23.836925 |
102 |
39055883 |
Installation of Tubewell with solid Platform and soak pit near Sujit Garia in Ramamoti |
100000 |
Installation of Tubewell with solid Platform and soak pit near Sujit Garia in Ramamoti1 |
Plinth level |
-
latitude : 23.437837567180395
Longitude : 86.20164150372148
file name : Image_06102021110556441.png
|
2021-10-06 11:05:56.528254 |
103 |
39055883 |
Installation of Tubewell with solid Platform and soak pit near Sujit Garia in Ramamoti |
100000 |
Installation of Tubewell with solid Platform and soak pit near Sujit Garia in Ramamoti1 |
Completion of work |
-
latitude : 23.43778823968023
Longitude : 86.20164611376822
file name : Image_19092021160527855.png
|
2021-09-19 16:05:27.936787 |
104 |
39051526 |
Installation of Tubewell with solid Platform and soak pit at Majhpara at Bhelaidih |
100000 |
Installation of Tubewell with solid Platform and soak pit at Majhpara at Bhelaidih1 |
Plinth level |
-
latitude : 23.42398865148425
Longitude : 86.17351569235325
file name : Image_06102021103644133.png
|
2021-10-06 10:36:44.24973 |
105 |
39051526 |
Installation of Tubewell with solid Platform and soak pit at Majhpara at Bhelaidih |
100000 |
Installation of Tubewell with solid Platform and soak pit at Majhpara at Bhelaidih1 |
Completion of work |
-
latitude : 23.423944688402116
Longitude : 86.17351988330483
file name : Image_19092021164528821.png
|
2021-09-19 16:45:28.923622 |
106 |
57913497 |
PCC Road from Ajoy Mahato house to Sarbesar Mahato house in Durma |
300000 |
PCC Road from Ajoy Mahato house to Sarbesar Mahato house in Durma1 |
Roof laid |
-
latitude : 23.433464099653065,23.43348702415824
Longitude : 86.18166633881629,86.18170288391411
file name : Image_24032023101708490.png
|
2023-03-24 10:17:08.570363 |
107 |
57913497 |
PCC Road from Ajoy Mahato house to Sarbesar Mahato house in Durma |
300000 |
PCC Road from Ajoy Mahato house to Sarbesar Mahato house in Durma1 |
Roof laid |
-
latitude : 23.433478893712163,23.433281164616346
Longitude : 86.18169609457254,86.18126409128308
file name : Image_24032023102433491.png
|
2023-03-24 10:24:33.581848 |
108 |
57913497 |
PCC Road from Ajoy Mahato house to Sarbesar Mahato house in Durma |
300000 |
PCC Road from Ajoy Mahato house to Sarbesar Mahato house in Durma1 |
Plinth level |
-
latitude : 23.433446497656405,23.43342449516058
Longitude : 86.18169198743999,86.18171009235084
file name : Image_20032023165923489.png
|
2023-03-20 16:59:23.547363 |
109 |
57913497 |
PCC Road from Ajoy Mahato house to Sarbesar Mahato house in Durma |
300000 |
PCC Road from Ajoy Mahato house to Sarbesar Mahato house in Durma1 |
Completion of work |
-
latitude : 23.43343664892018,23.433465817943215
Longitude : 86.18132117204368,86.18163297884166
file name : Image_08032023080654034.png
|
2023-03-08 08:06:54.093657 |
110 |
34931878 |
Construction of Cremation Ghat at Paklaha Bandh in Baragram |
200000 |
Construction of Cremation Ghat at Paklaha Bandh in Baragram1 |
Roof laid |
-
latitude : 23.44192324206233
Longitude : 86.22295517474413
file name : Image_24122021163104739.png
|
2021-12-24 16:31:04.876179 |
111 |
34931878 |
Construction of Cremation Ghat at Paklaha Bandh in Baragram |
200000 |
Construction of Cremation Ghat at Paklaha Bandh in Baragram1 |
Plinth level |
-
latitude : 23.441888205707073
Longitude : 86.22285258024931
file name : Image_18122021164105802.png
|
2021-12-18 16:41:05.918542 |
112 |
34931878 |
Construction of Cremation Ghat at Paklaha Bandh in Baragram |
200000 |
Construction of Cremation Ghat at Paklaha Bandh in Baragram1 |
Completion of work |
-
latitude : 23.441949519328773
Longitude : 86.22288258746266
file name : Image_27112021150215664.png
|
2021-11-27 15:02:15.764006 |
113 |
34756857 |
Construction of PCC from Bheria Primary School to Gurupada Mahali House at Bheria |
180000 |
Construction of PCC from Bheria Primary School to Gurupada Mahali House at Bheria1 |
Completion of work |
-
latitude : 23.462033942341805,23.46199634950608
Longitude : 86.17666301317513,86.17694338783622
file name : Image_19022021160102485.png
|
2021-02-19 16:01:02.586984 |
114 |
34756857 |
Construction of PCC from Bheria Primary School to Gurupada Mahali House at Bheria |
180000 |
Construction of PCC from Bheria Primary School to Gurupada Mahali House at Bheria1 |
Plinth level |
-
latitude : 23.46206809859723,23.461984950117767
Longitude : 86.17662219330668,86.17707699537277
file name : Image_09042021124437019.png
|
2021-04-09 12:44:37.102045 |
115 |
34756857 |
Construction of PCC from Bheria Primary School to Gurupada Mahali House at Bheria |
180000 |
Construction of PCC from Bheria Primary School to Gurupada Mahali House at Bheria1 |
Roof laid |
-
latitude : 23.462068727239966,23.46205808222294
Longitude : 86.17666183970869,86.17707238532603
file name : Image_16042021161605394.png
|
2021-04-16 16:16:05.459118 |
116 |
34921689 |
Installation of Tubewell with solid platforma and soak pit at Poddar Para in Baragram |
100000 |
Installation of Tubewell with solid platforma and soak pit at Poddar Para in Baragram1 |
Roof laid |
-
latitude : 23.440951695665717
Longitude : 86.22217004187405
file name : Image_28012022124056918.png
|
2022-01-28 12:40:57.04088 |
117 |
34921689 |
Installation of Tubewell with solid platforma and soak pit at Poddar Para in Baragram |
100000 |
Installation of Tubewell with solid platforma and soak pit at Poddar Para in Baragram1 |
Completion of work |
-
latitude : 23.44089583028108
Longitude : 86.22219770215452
file name : Image_30122021143824329.png
|
2021-12-30 14:38:24.442098 |
118 |
34921689 |
Installation of Tubewell with solid platforma and soak pit at Poddar Para in Baragram |
100000 |
Installation of Tubewell with solid platforma and soak pit at Poddar Para in Baragram1 |
Plinth level |
-
latitude : 23.440941469743848
Longitude : 86.2221640907228
file name : Image_12012022160710524.png
|
2022-01-12 16:07:10.618451 |
119 |
39068885 |
Installation of Tubewell with solid Platform and soak pit near Kali Mandir in Agharpur |
100000 |
Installation of Tubewell with solid Platform and soak pit near Kali Mandir in Agharpur1 |
Roof laid |
-
latitude : 23.425379460677505
Longitude : 86.20221147313714
file name : Image_28012022115720605.png
|
2022-01-28 11:57:20.724972 |
120 |
39068885 |
Installation of Tubewell with solid Platform and soak pit near Kali Mandir in Agharpur |
100000 |
Installation of Tubewell with solid Platform and soak pit near Kali Mandir in Agharpur1 |
Completion of work |
-
latitude : 23.325596801005304
Longitude : 86.35707467794418
file name : Image_30122021132424158.png
|
2021-12-30 13:24:24.54942 |
121 |
39068885 |
Installation of Tubewell with solid Platform and soak pit near Kali Mandir in Agharpur |
100000 |
Installation of Tubewell with solid Platform and soak pit near Kali Mandir in Agharpur1 |
Plinth level |
-
latitude : 23.425365672446787
Longitude : 86.20217316783965
file name : Image_12012022154707669.png
|
2022-01-12 15:47:07.770648 |
122 |
34894260 |
Construction of PCC from Dhananjoy Mahato House to Hari Mandir at Silfore |
100000 |
Construction of PCC from Dhananjoy Mahato House to Hari Mandir at Silfore1 |
Plinth level |
-
latitude : 23.439280427992344,23.439112748019397
Longitude : 86.17789682932198,86.17783865891397
file name : Image_14072021154556967.png
|
2021-07-14 15:45:57.068593 |
123 |
34894260 |
Construction of PCC from Dhananjoy Mahato House to Hari Mandir at Silfore |
100000 |
Construction of PCC from Dhananjoy Mahato House to Hari Mandir at Silfore1 |
Completion of work |
-
latitude : 23.439263957552612,23.439151933416724
Longitude : 86.17790185846388,86.17777554318309
file name : Image_10062021155829934.png
|
2021-06-10 15:58:30.034974 |
124 |
34916353 |
Installation of Tube well with solid platform and soak pit at Ramamoti Kalimandir |
100000 |
Installation of Tube well with solid platform and soak pit at Ramamoti Kalimandir1 |
Roof laid |
-
latitude : 23.43327274080366
Longitude : 86.2047725636512
file name : Image_04022022150432926.png
|
2022-02-04 15:04:33.035239 |
125 |
34916353 |
Installation of Tube well with solid platform and soak pit at Ramamoti Kalimandir |
100000 |
Installation of Tube well with solid platform and soak pit at Ramamoti Kalimandir1 |
Plinth level |
-
latitude : 23.4332955814898
Longitude : 86.20474012568593
file name : Image_28012022120825019.png
|
2022-01-28 12:08:25.248802 |
126 |
34916353 |
Installation of Tube well with solid platform and soak pit at Ramamoti Kalimandir |
100000 |
Installation of Tube well with solid platform and soak pit at Ramamoti Kalimandir1 |
Completion of work |
-
latitude : 23.43324340414256
Longitude : 86.20473727583885
file name : Image_11012022113247409.png
|
2022-01-11 11:32:47.510014 |
127 |
39068744 |
Installation of Tubewell with solid Platform and soak pit near Subhash Mahato house in Agharpur |
100000 |
Installation of Tubewell with solid Platform and soak pit near Subhash Mahato house in Agharpur1 |
Roof laid |
-
latitude : 23.426510095596313
Longitude : 86.20306055992842
file name : Image_04022022145607387.png
|
2022-02-04 14:56:07.525969 |
128 |
39068744 |
Installation of Tubewell with solid Platform and soak pit near Subhash Mahato house in Agharpur |
100000 |
Installation of Tubewell with solid Platform and soak pit near Subhash Mahato house in Agharpur1 |
Plinth level |
-
latitude : 23.426537797786295
Longitude : 86.20304463431239
file name : Image_28012022121921854.png
|
2022-01-28 12:19:21.951638 |
129 |
39068744 |
Installation of Tubewell with solid Platform and soak pit near Subhash Mahato house in Agharpur |
100000 |
Installation of Tubewell with solid Platform and soak pit near Subhash Mahato house in Agharpur1 |
Completion of work |
-
latitude : 23.426510514691472
Longitude : 86.20306139811873
file name : Image_11012022112204668.png
|
2022-01-11 11:22:04.788618 |
130 |
34922423 |
Installation of Tube well with solid platform and soak pit at School More in Baragram |
100000 |
Installation of Tube well with solid platform and soak pit at School More in Baragram1 |
Roof laid |
-
latitude : 23.44697790686041
Longitude : 86.20352709665895
file name : Image_19022022163153838.png
|
2022-02-19 16:31:53.942085 |
131 |
34922423 |
Installation of Tube well with solid platform and soak pit at School More in Baragram |
100000 |
Installation of Tube well with solid platform and soak pit at School More in Baragram1 |
Plinth level |
-
latitude : 23.439126745797694
Longitude : 86.21567649766803
file name : Image_04022022155626905.png
|
2022-02-04 15:56:27.014889 |
132 |
34922423 |
Installation of Tube well with solid platform and soak pit at School More in Baragram |
100000 |
Installation of Tube well with solid platform and soak pit at School More in Baragram1 |
Completion of work |
-
latitude : 23.439118238165975
Longitude : 86.2156449817121
file name : Image_28012022135808476.png
|
2022-01-28 13:58:08.594574 |
133 |
66949538 |
Creation of drainage channel for management of grey water |
95000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.448689030483365
Longitude : 86.20259779505432
file name : Image_20062023120809656.png
|
2023-06-20 12:08:09.773151 |
134 |
66949538 |
Creation of drainage channel for management of grey water |
95000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.448664220049977
Longitude : 86.20259460993111
file name : Image_17062023092950137.png
|
2023-06-17 09:29:50.231374 |
135 |
66949538 |
Creation of drainage channel for management of grey water |
95000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.448662208393216
Longitude : 86.20252805761993
file name : Image_10052023155738395.png
|
2023-05-10 15:57:38.520474 |
136 |
34752456 |
Construction of PCC from Natun Bandh to Nawa Bandh at Hargara |
90000 |
Construction of PCC from Natun Bandh to Nawa Bandh at Hargara1 |
Plinth level |
-
latitude : 23.446671338751912,23.447000831365585
Longitude : 86.16536772809923,86.16543721407652
file name : Image_12022022142554970.png
|
2022-02-12 14:25:55.063609 |
137 |
34752456 |
Construction of PCC from Natun Bandh to Nawa Bandh at Hargara |
90000 |
Construction of PCC from Natun Bandh to Nawa Bandh at Hargara1 |
Roof laid |
-
latitude : 23.446715637110174,23.447059630416334
Longitude : 86.16536630317569,86.16545523516834
file name : Image_14022022152136468.png
|
2022-02-14 15:21:36.560945 |
138 |
34752456 |
Construction of PCC from Natun Bandh to Nawa Bandh at Hargara |
90000 |
Construction of PCC from Natun Bandh to Nawa Bandh at Hargara1 |
Completion of work |
-
latitude : 23.446742710657418,23.4470156673342
Longitude : 86.16543419659138,86.16548239253461
file name : Image_04022022163929704.png
|
2022-02-04 16:39:29.800054 |
139 |
34752456 |
Construction of PCC from Natun Bandh to Nawa Bandh at Hargara |
90000 |
Construction of PCC from Natun Bandh to Nawa Bandh at Hargara1 |
Completion of work |
-
latitude : 23.444875641725957,23.44533069524914
Longitude : 86.16498794406652,86.1649463698268
file name : Image_11012022104837233.png
|
2022-01-11 10:48:37.388628 |
140 |
47148672 |
Sock Pit near Government Dugwell at Kali Mandir in Baragram |
75000 |
Sock Pit near Government Dugwell at Kali Mandir in Baragram1 |
Completion of work |
-
latitude : 23.44508363865316
Longitude : 86.2204306293279
file name : Image_06112022152018633.png
|
2022-11-06 15:20:18.696648 |
141 |
47148672 |
Sock Pit near Government Dugwell at Kali Mandir in Baragram |
75000 |
Sock Pit near Government Dugwell at Kali Mandir in Baragram1 |
Plinth level |
-
latitude : 23.44507056288421
Longitude : 86.22037547640502
file name : Image_08112022150038280.png
|
2022-11-08 15:00:38.357417 |
142 |
47148672 |
Sock Pit near Government Dugwell at Kali Mandir in Baragram |
75000 |
Sock Pit near Government Dugwell at Kali Mandir in Baragram1 |
Roof laid |
-
latitude : 23.445066078566015
Longitude : 86.22038771398365
file name : Image_24112022141158017.png
|
2022-11-24 14:11:58.088203 |
143 |
39068058 |
Construction of Soak Pit of Kalindi Para Tube well |
30000 |
Construction of Soak Pit of Kalindi Para Tube well1 |
Completion of work |
-
latitude : 23.442654772661626
Longitude : 86.22011840343475
file name : Image_07012022150819906.png
|
2022-01-07 15:08:20.006425 |
144 |
39068058 |
Construction of Soak Pit of Kalindi Para Tube well |
30000 |
Construction of Soak Pit of Kalindi Para Tube well1 |
Completion of work |
-
latitude : 23.442676356062293
Longitude : 86.22016131877899
file name : Image_12012022160056327.png
|
2022-01-12 16:00:56.421779 |
145 |
39051685 |
Installation of Tubewell with solid Platform and soak pit near Primary School at Durma |
100000 |
Installation of Tubewell with solid Platform and soak pit near Primary School at Durma1 |
Plinth level |
-
latitude : 23.433476672507823
Longitude : 86.1815910693258
file name : Image_28012022111924938.png
|
2022-01-28 11:19:25.045138 |
146 |
39051685 |
Installation of Tubewell with solid Platform and soak pit near Primary School at Durma |
100000 |
Installation of Tubewell with solid Platform and soak pit near Primary School at Durma1 |
Completion of work |
-
latitude : 23.433547876775265
Longitude : 86.18149266578257
file name : Image_30122021140256382.png
|
2021-12-30 14:02:56.474656 |
147 |
39051685 |
Installation of Tubewell with solid Platform and soak pit near Primary School at Durma |
100000 |
Installation of Tubewell with solid Platform and soak pit near Primary School at Durma1 |
Plinth level |
-
latitude : 23.43341598752886
Longitude : 86.18159207515419
file name : Image_07012022173115636.png
|
2022-01-07 17:31:15.733288 |
148 |
34754287 |
Construction of PCC from Nawa Bandh to Main Road at Hargara |
70000 |
Construction of PCC from Nawa Bandh to Main Road at Hargara1 |
Plinth level |
-
latitude : 23.444802509620786,23.444645013660192
Longitude : 86.16504460573196,86.16518366150558
file name : Image_12022022143358713.png
|
2022-02-12 14:33:58.843017 |
149 |
34754287 |
Construction of PCC from Nawa Bandh to Main Road at Hargara |
70000 |
Construction of PCC from Nawa Bandh to Main Road at Hargara1 |
Roof laid |
-
latitude : 23.44482258427888,23.444687006995082
Longitude : 86.16506396792829,86.16517108865082
file name : Image_14022022152838935.png
|
2022-02-14 15:28:39.056646 |
150 |
34754287 |
Construction of PCC from Nawa Bandh to Main Road at Hargara |
70000 |
Construction of PCC from Nawa Bandh to Main Road at Hargara1 |
Completion of work |
-
latitude : 23.44486742746085,23.444591872394085
Longitude : 86.16499800235033,86.16523680277169
file name : Image_02012022172608272.png
|
2022-01-02 17:26:08.365603 |
151 |
39051890 |
Installation of Tubewell with solid Platform and soak pit at Shashtitala in Kusumtikri |
100000 |
Installation of Tubewell with solid Platform and soak pit at Shashtitala in Kusumtikri1 |
Roof laid |
-
latitude : 23.43003544025123
Longitude : 86.18447410874069
file name : Image_09072022122756064.png
|
2022-07-09 12:27:56.139895 |
152 |
39051890 |
Installation of Tubewell with solid Platform and soak pit at Shashtitala in Kusumtikri |
100000 |
Installation of Tubewell with solid Platform and soak pit at Shashtitala in Kusumtikri1 |
Completion of work |
-
latitude : 23.43004608526826
Longitude : 86.1844334565103
file name : Image_03042022134957718.png
|
2022-04-03 13:49:57.852109 |
153 |
39051890 |
Installation of Tubewell with solid Platform and soak pit at Shashtitala in Kusumtikri |
100000 |
Installation of Tubewell with solid Platform and soak pit at Shashtitala in Kusumtikri1 |
Plinth level |
-
latitude : 23.43008330091834
Longitude : 86.18447301909328
file name : Image_09042022172443346.png
|
2022-04-09 17:24:43.447655 |
154 |
39051890 |
Installation of Tubewell with solid Platform and soak pit at Shashtitala in Kusumtikri |
100000 |
Installation of Tubewell with solid Platform and soak pit at Shashtitala in Kusumtikri1 |
Completion of work |
-
latitude : 23.43004730064422
Longitude : 86.18456832133234
file name : Image_18032022180348809.png
|
2022-03-18 18:03:48.880434 |
155 |
39051327 |
Installation of Tubewell with solid Platform and soak pit near Muruli Mahato House at Hargara |
100000 |
Installation of Tubewell with solid Platform and soak pit near Muruli Mahato House at Hargara1 |
Roof laid |
-
latitude : 23.4434478264302
Longitude : 86.16917730309069
file name : Image_26012022172322055.png
|
2022-01-26 17:23:22.148575 |
156 |
39051327 |
Installation of Tubewell with solid Platform and soak pit near Muruli Mahato House at Hargara |
100000 |
Installation of Tubewell with solid Platform and soak pit near Muruli Mahato House at Hargara1 |
Completion of work |
-
latitude : 23.443487933836877
Longitude : 86.16917973384261
file name : Image_26122021165622896.png
|
2021-12-26 16:56:23.031625 |
157 |
39051327 |
Installation of Tubewell with solid Platform and soak pit near Muruli Mahato House at Hargara |
100000 |
Installation of Tubewell with solid Platform and soak pit near Muruli Mahato House at Hargara1 |
Completion of work |
-
latitude : 23.443436678498983
Longitude : 86.16916640661657
file name : Image_07012022165537252.png
|
2022-01-07 16:55:37.366907 |
158 |
39051327 |
Installation of Tubewell with solid Platform and soak pit near Muruli Mahato House at Hargara |
100000 |
Installation of Tubewell with solid Platform and soak pit near Muruli Mahato House at Hargara1 |
Completion of work |
-
latitude : 23.443487933836877
Longitude : 86.16917973384261
file name : Image_26122021174400153.png
|
2021-12-26 17:44:00.252968 |
159 |
39051327 |
Installation of Tubewell with solid Platform and soak pit near Muruli Mahato House at Hargara |
100000 |
Installation of Tubewell with solid Platform and soak pit near Muruli Mahato House at Hargara1 |
Plinth level |
-
latitude : 23.443441707640886
Longitude : 86.16915324702859
file name : Image_12012022143006930.png
|
2022-01-12 14:30:07.0437 |
160 |
39060262 |
Installation of Tubewell with solid Platform and soak pit near Behara Bandh in Ratnadih |
100000 |
Installation of Tubewell with solid Platform and soak pit near Behara Bandh in Ratnadih1 |
Roof laid |
-
latitude : 23.449557437561452
Longitude : 86.23803103342652
file name : Image_26012022164853100.png
|
2022-01-26 16:48:53.222142 |
161 |
39060262 |
Installation of Tubewell with solid Platform and soak pit near Behara Bandh in Ratnadih |
100000 |
Installation of Tubewell with solid Platform and soak pit near Behara Bandh in Ratnadih1 |
Completion of work |
-
latitude : 23.44509214628488
Longitude : 86.20402766391635
file name : Image_26122021152027504.png
|
2021-12-26 15:20:27.619597 |
162 |
39060262 |
Installation of Tubewell with solid Platform and soak pit near Behara Bandh in Ratnadih |
100000 |
Installation of Tubewell with solid Platform and soak pit near Behara Bandh in Ratnadih1 |
Plinth level |
-
latitude : 23.445009416900575
Longitude : 86.20400151237845
file name : Image_07012022162208916.png
|
2022-01-07 16:22:09.033505 |
163 |
34893210 |
Installation of Tubewell with solid platform and soak pit near Gurupda Kumar House at Silfor |
100000 |
Installation of Tubewell with solid platform and soak pit near Gurupda Kumar House at Silfor1 |
Roof laid |
-
latitude : 23.440964058972895
Longitude : 86.17755660787225
file name : Image_26012022170456794.png
|
2022-01-26 17:04:56.881937 |
164 |
34893210 |
Installation of Tubewell with solid platform and soak pit near Gurupda Kumar House at Silfor |
100000 |
Installation of Tubewell with solid platform and soak pit near Gurupda Kumar House at Silfor1 |
Completion of work |
-
latitude : 23.454078678041697
Longitude : 86.1915638577193
file name : Image_26122021154148807.png
|
2021-12-26 15:41:48.903019 |
165 |
34893210 |
Installation of Tubewell with solid platform and soak pit near Gurupda Kumar House at Silfor |
100000 |
Installation of Tubewell with solid platform and soak pit near Gurupda Kumar House at Silfor1 |
Plinth level |
-
latitude : 23.44097340479493
Longitude : 86.17751955986023
file name : Image_07012022171529372.png
|
2022-01-07 17:15:29.461532 |
166 |
39066800 |
Installation of Tubewell with solid Platform and soak pit near Gopal Paramanik house at Kokiara |
100000 |
Installation of Tubewell with solid Platform and soak pit near Gopal Paramanik house at Kokiara1 |
Plinth level |
-
latitude : 23.452427904121578
Longitude : 86.2363210413605
file name : Image_14022022171327413.png
|
2022-02-14 17:13:27.495423 |
167 |
39066800 |
Installation of Tubewell with solid Platform and soak pit near Gopal Paramanik house at Kokiara |
100000 |
Installation of Tubewell with solid Platform and soak pit near Gopal Paramanik house at Kokiara1 |
Roof laid |
-
latitude : 23.452402967959642
Longitude : 86.23632648959756
file name : Image_19022022155759960.png
|
2022-02-19 15:58:00.079282 |
168 |
39066800 |
Installation of Tubewell with solid Platform and soak pit near Gopal Paramanik house at Kokiara |
100000 |
Installation of Tubewell with solid Platform and soak pit near Gopal Paramanik house at Kokiara1 |
Completion of work |
-
latitude : 23.452389976009727
Longitude : 86.23640066944063
file name : Image_26012022123417620.png
|
2022-01-26 12:34:17.733175 |
169 |
39060419 |
Installation of Tubewell with solid Platform and soak pit near Hanuman Mandir at Kokiara |
100000 |
Installation of Tubewell with solid Platform and soak pit near Hanuman Mandir at Kokiara1 |
Roof laid |
-
latitude : 23.449650602415204
Longitude : 86.23833227902651
file name : Image_14022022172310641.png
|
2022-02-14 17:23:10.718488 |
170 |
39060419 |
Installation of Tubewell with solid Platform and soak pit near Hanuman Mandir at Kokiara |
100000 |
Installation of Tubewell with solid Platform and soak pit near Hanuman Mandir at Kokiara1 |
Plinth level |
-
latitude : 23.449647584930062
Longitude : 86.2383135035634
file name : Image_14022022144907206.png
|
2022-02-14 14:49:07.329366 |
171 |
39060419 |
Installation of Tubewell with solid Platform and soak pit near Hanuman Mandir at Kokiara |
100000 |
Installation of Tubewell with solid Platform and soak pit near Hanuman Mandir at Kokiara1 |
Completion of work |
-
latitude : 23.44962696544826
Longitude : 86.23837368562818
file name : Image_26012022125237109.png
|
2022-01-26 12:52:37.224172 |
172 |
34899740 |
Construction of PCC from Sarbeswar Mahato House to Dulal Mahato House at Durma |
100000 |
Construction of PCC from Sarbeswar Mahato House to Dulal Mahato House at Durma1 |
Roof laid |
-
latitude : 23.43271140474826,23.43300824984908
Longitude : 86.18107382208109,86.18114724755287
file name : Image_14022022145249498.png
|
2022-02-14 14:52:49.610892 |
173 |
34899740 |
Construction of PCC from Sarbeswar Mahato House to Dulal Mahato House at Durma |
100000 |
Construction of PCC from Sarbeswar Mahato House to Dulal Mahato House at Durma1 |
Plinth level |
-
latitude : 23.432701849378645,23.432980882935226
Longitude : 86.18104440160096,86.18119644932449
file name : Image_04022022143516890.png
|
2022-02-04 14:35:16.996485 |
174 |
34899740 |
Construction of PCC from Sarbeswar Mahato House to Dulal Mahato House at Durma |
100000 |
Construction of PCC from Sarbeswar Mahato House to Dulal Mahato House at Durma1 |
Completion of work |
-
latitude : 23.432716098614037,23.43296696897596
Longitude : 86.1810680385679,86.18115252815187
file name : Image_28012022113525721.png
|
2022-01-28 11:35:25.843861 |
175 |
39068939 |
Construction of drain from Upar Kuli to Paklaha Bandh at Agharpur |
100000 |
Construction of drain from Upar Kuli to Paklaha Bandh at Agharpur1 |
Completion of work |
-
latitude : 23.425288810394704,23.425073102116585
Longitude : 86.20358283631504,86.20346582494676
file name : Image_08032022101422106.png
|
2022-03-08 10:14:22.228021 |
176 |
47175197 |
Deep tube well with solar Pump and Water storage at Bhelaidh Upar para |
450000 |
Deep tube well with solar Pump and Water storage at Bhelaidh Upar para1 |
Roof laid |
-
latitude : 23.42127769254148
Longitude : 86.17044464685023
file name : Image_07052022180025483.png
|
2022-05-07 18:00:25.600479 |
177 |
47175197 |
Deep tube well with solar Pump and Water storage at Bhelaidh Upar para |
450000 |
Deep tube well with solar Pump and Water storage at Bhelaidh Upar para1 |
Completion of work |
-
latitude : 23.421254348941147
Longitude : 86.17043391801417
file name : Image_20032022113357842.png
|
2022-03-20 11:33:57.947704 |
178 |
47175197 |
Deep tube well with solar Pump and Water storage at Bhelaidh Upar para |
450000 |
Deep tube well with solar Pump and Water storage at Bhelaidh Upar para1 |
Plinth level |
-
latitude : 23.421301245689392
Longitude : 86.17048521526158
file name : Image_26032022163033662.png
|
2022-03-26 16:30:33.766234 |
179 |
34916934 |
Installation of Tube well with solid platform and soak pit at Ratnadih Purano Basti |
100000 |
Installation of Tube well with solid platform and soak pit at Ratnadih Purano Basti1 |
Plinth level |
-
latitude : 23.45022279303521
Longitude : 86.2033689301461
file name : Image_03042022125237338.png
|
2022-04-03 12:52:37.459372 |
180 |
34916934 |
Installation of Tube well with solid platform and soak pit at Ratnadih Purano Basti |
100000 |
Installation of Tube well with solid platform and soak pit at Ratnadih Purano Basti1 |
Roof laid |
-
latitude : 23.450238090008497
Longitude : 86.2034048885107
file name : Image_09042022162145601.png
|
2022-04-09 16:21:45.692207 |
181 |
34916934 |
Installation of Tube well with solid platform and soak pit at Ratnadih Purano Basti |
100000 |
Installation of Tube well with solid platform and soak pit at Ratnadih Purano Basti1 |
Completion of work |
-
latitude : 23.45020841807127
Longitude : 86.20338276028633
file name : Image_17032022093210578.png
|
2022-03-17 09:32:10.731266 |
182 |
47174322 |
Tube well with Solid Platform and soak pit near Paran Gorai house in Baragram |
76000 |
Tube well with Solid Platform and soak pit near Paran Gorai house in Baragram1 |
Plinth level |
-
latitude : 23.445894797332585
Longitude : 86.21895709075034
file name : Image_03042022121618413.png
|
2022-04-03 12:16:18.517136 |
183 |
47174322 |
Tube well with Solid Platform and soak pit near Paran Gorai house in Baragram |
76000 |
Tube well with Solid Platform and soak pit near Paran Gorai house in Baragram1 |
Roof laid |
-
latitude : 23.44592731911689
Longitude : 86.21897477656603
file name : Image_09042022154802688.png
|
2022-04-09 15:48:02.808188 |
184 |
47174322 |
Tube well with Solid Platform and soak pit near Paran Gorai house in Baragram |
76000 |
Tube well with Solid Platform and soak pit near Paran Gorai house in Baragram1 |
Completion of work |
-
latitude : 23.445873339660466
Longitude : 86.21896463446319
file name : Image_17032022100314530.png
|
2022-03-17 10:03:14.64154 |
185 |
47176312 |
Tube well with Solid Platform and soak pit near sudhir Mahato house in Balibhasa |
76000 |
Tube well with Solid Platform and soak pit near sudhir Mahato house in Balibhasa1 |
Plinth level |
-
latitude : 23.431627666577697
Longitude : 86.17097798734903
file name : Image_03042022133518999.png
|
2022-04-03 13:35:19.157015 |
186 |
47176312 |
Tube well with Solid Platform and soak pit near sudhir Mahato house in Balibhasa |
76000 |
Tube well with Solid Platform and soak pit near sudhir Mahato house in Balibhasa1 |
Roof laid |
-
latitude : 23.43160143122077
Longitude : 86.17105870507658
file name : Image_09042022180234848.png
|
2022-04-09 18:02:34.950056 |
187 |
47176312 |
Tube well with Solid Platform and soak pit near sudhir Mahato house in Balibhasa |
76000 |
Tube well with Solid Platform and soak pit near sudhir Mahato house in Balibhasa1 |
Completion of work |
-
latitude : 23.431578925810754
Longitude : 86.17103146389127
file name : Image_18032022174559043.png
|
2022-03-18 17:45:59.142389 |
188 |
47181781 |
Tube well with Solid Platform and soak pit near Ansari Para Maszid in Baragram |
76000 |
Tube well with Solid Platform and soak pit near Ansari Para Maszid in Baragram1 |
Plinth level |
-
latitude : 23.442306965589523
Longitude : 86.218895399943
file name : Image_03042022120411802.png
|
2022-04-03 12:04:11.877983 |
189 |
47181781 |
Tube well with Solid Platform and soak pit near Ansari Para Maszid in Baragram |
76000 |
Tube well with Solid Platform and soak pit near Ansari Para Maszid in Baragram1 |
Roof laid |
-
latitude : 23.337292238138616
Longitude : 86.37039829976857
file name : Image_09042022154213874.png
|
2022-04-09 15:42:13.983222 |
190 |
47181781 |
Tube well with Solid Platform and soak pit near Ansari Para Maszid in Baragram |
76000 |
Tube well with Solid Platform and soak pit near Ansari Para Maszid in Baragram1 |
Completion of work |
-
latitude : 23.450285238213837
Longitude : 86.20568426325917
file name : Image_17032022095450584.png
|
2022-03-17 09:54:50.717707 |
191 |
47175850 |
Tube well with Solid Platform and soak pit near Bhutnath Mahato house in Bangora |
76000 |
Tube well with Solid Platform and soak pit near Bhutnath Mahato house in Bangora1 |
Plinth level |
-
latitude : 23.45511677674949
Longitude : 86.19112657383084
file name : Image_03042022130224573.png
|
2022-04-03 13:02:24.682517 |
192 |
47175850 |
Tube well with Solid Platform and soak pit near Bhutnath Mahato house in Bangora |
76000 |
Tube well with Solid Platform and soak pit near Bhutnath Mahato house in Bangora1 |
Roof laid |
-
latitude : 23.45514452084899
Longitude : 86.19114333763719
file name : Image_24042022100937163.png
|
2022-04-24 10:09:37.246347 |
193 |
47175850 |
Tube well with Solid Platform and soak pit near Bhutnath Mahato house in Bangora |
76000 |
Tube well with Solid Platform and soak pit near Bhutnath Mahato house in Bangora1 |
Completion of work |
-
latitude : 23.455127547495067
Longitude : 86.19114593602717
file name : Image_18032022172055270.png
|
2022-03-18 17:20:55.351667 |
194 |
47175417 |
Tube well with Solid Platform and soak pit near Golap bandh at Ratnadih |
76000 |
Tube well with Solid Platform and soak pit near Golap bandh at Ratnadih1 |
Plinth level |
-
latitude : 23.44921042677015
Longitude : 86.20574025437236
file name : Image_03042022124446884.png
|
2022-04-03 12:44:46.996216 |
195 |
47175417 |
Tube well with Solid Platform and soak pit near Golap bandh at Ratnadih |
76000 |
Tube well with Solid Platform and soak pit near Golap bandh at Ratnadih1 |
Roof laid |
-
latitude : 23.449210468679667
Longitude : 86.20574737899005
file name : Image_09042022161618591.png
|
2022-04-09 16:16:18.697499 |
196 |
47175417 |
Tube well with Solid Platform and soak pit near Golap bandh at Ratnadih |
76000 |
Tube well with Solid Platform and soak pit near Golap bandh at Ratnadih1 |
Completion of work |
-
latitude : 23.449112274684012
Longitude : 86.2057343032211
file name : Image_17032022093958705.png
|
2022-03-17 09:39:58.799198 |
197 |
34889856 |
Installation of Tubewell with solid platform and soak pit near Aklu Mahato bari at Balibhasa |
100000 |
Installation of Tubewell with solid platform and soak pit near Aklu Mahato bari at Balibhasa 1 |
Plinth level |
-
latitude : 23.433839357458055
Longitude : 86.17500490508974
file name : Image_03042022132328933.png
|
2022-04-03 13:23:29.068733 |
198 |
34889856 |
Installation of Tubewell with solid platform and soak pit near Aklu Mahato bari at Balibhasa |
100000 |
Installation of Tubewell with solid platform and soak pit near Aklu Mahato bari at Balibhasa 1 |
Roof laid |
-
latitude : 23.43387095723301
Longitude : 86.17503927089274
file name : Image_09042022175551229.png
|
2022-04-09 17:55:51.344462 |
199 |
34889856 |
Installation of Tubewell with solid platform and soak pit near Aklu Mahato bari at Balibhasa |
100000 |
Installation of Tubewell with solid platform and soak pit near Aklu Mahato bari at Balibhasa 1 |
Completion of work |
-
latitude : 23.433924643322825
Longitude : 86.17507464252412
file name : Image_18032022174014725.png
|
2022-03-18 17:40:14.833226 |
200 |
34755818 |
Construction of PCC from Bheria Primary School to Jahirthan at Bheria |
200000 |
Construction of PCC from Bheria Primary School to Jahirthan at Bheria1 |
Roof laid |
-
latitude : 23.46199886407703,23.4622923983261
Longitude : 86.17519718594849,86.1753351520747
file name : Image_07052022110633304.png
|
2022-05-07 11:06:33.367245 |
201 |
34755818 |
Construction of PCC from Bheria Primary School to Jahirthan at Bheria |
200000 |
Construction of PCC from Bheria Primary School to Jahirthan at Bheria1 |
Completion of work |
-
latitude : 23.462440129369497,23.462157784961164
Longitude : 86.17530832998455,86.17518779821694
file name : Image_26122021161359679.png
|
2021-12-26 16:13:59.756125 |
202 |
34755818 |
Construction of PCC from Bheria Primary School to Jahirthan at Bheria |
200000 |
Construction of PCC from Bheria Primary School to Jahirthan at Bheria1 |
Plinth level |
-
latitude : 23.462043455801904,23.462332380004227
Longitude : 86.17513834498823,86.17526734247804
file name : Image_24042022102156207.png
|
2022-04-24 10:21:56.30585 |
203 |
34919116 |
Construction of PCC from Aswini Kumar House to Ashoke House at Kokiara |
280000 |
Construction of PCC from Aswini Kumar House to Ashoke House at Kokiara1 |
Plinth level |
-
latitude : 23.450971422716975,23.450647881254554
Longitude : 86.235804380849,86.23583346605301
file name : Image_06052022090811811.png
|
2022-05-06 09:08:11.903895 |
204 |
34919116 |
Construction of PCC from Aswini Kumar House to Ashoke House at Kokiara |
280000 |
Construction of PCC from Aswini Kumar House to Ashoke House at Kokiara1 |
Completion of work |
-
latitude : 23.451006039977074,23.450512806884944
Longitude : 86.2357800733298,86.23581033200026
file name : Image_26012022124702507.png
|
2022-01-26 12:47:02.63282 |
205 |
34887782 |
Installation of Tubewell with solid platform and soak pit near Subodh Mahato House at Balibhasa |
100000 |
Installation of Tubewell with solid platform and soak pit near Subodh Mahato House at Balibhasa 1 |
Roof laid |
-
latitude : 23.431639652699232
Longitude : 86.17339205928147
file name : Image_16052022084846011.png
|
2022-05-16 08:48:46.10567 |
206 |
34887782 |
Installation of Tubewell with solid platform and soak pit near Subodh Mahato House at Balibhasa |
100000 |
Installation of Tubewell with solid platform and soak pit near Subodh Mahato House at Balibhasa 1 |
Plinth level |
-
latitude : 23.43164170626551
Longitude : 86.17336858995259
file name : Image_09042022180523807.png
|
2022-04-09 18:05:23.888189 |
207 |
34887782 |
Installation of Tubewell with solid platform and soak pit near Subodh Mahato House at Balibhasa |
100000 |
Installation of Tubewell with solid platform and soak pit near Subodh Mahato House at Balibhasa 1 |
Plinth level |
-
latitude : 23.4315930493176
Longitude : 86.17333673872054
file name : Image_03042022133118239.png
|
2022-04-03 13:31:18.373774 |
208 |
34887782 |
Installation of Tubewell with solid platform and soak pit near Subodh Mahato House at Balibhasa |
100000 |
Installation of Tubewell with solid platform and soak pit near Subodh Mahato House at Balibhasa 1 |
Completion of work |
-
latitude : 23.431628420948982
Longitude : 86.17337697185576
file name : Image_12012022151236527.png
|
2022-01-12 15:12:36.634044 |
209 |
39051433 |
Installation of Tubewell with solid Platform and soak pit near Hanuman Mandir at Hargara |
100000 |
Installation of Tubewell with solid Platform and soak pit near Hanuman Mandir at Hargara1 |
Plinth level |
-
latitude : 23.443523934111
Longitude : 86.1631936300546
file name : Image_09042022182037192.png
|
2022-04-09 18:20:37.287559 |
210 |
39051433 |
Installation of Tubewell with solid Platform and soak pit near Hanuman Mandir at Hargara |
100000 |
Installation of Tubewell with solid Platform and soak pit near Hanuman Mandir at Hargara1 |
Completion of work |
-
latitude : 23.443505284376442
Longitude : 86.16318508051336
file name : Image_12022022145006714.png
|
2022-02-12 14:50:06.834963 |
211 |
47181969 |
Tube well with Solid Platform and soak pit near Baragram School More in Baragram |
76000 |
Tube well with Solid Platform and soak pit near Baragram School More in Baragram1 |
Roof laid |
-
latitude : 23.440686408430338
Longitude : 86.21415090747178
file name : Image_16072022125238759.png
|
2022-07-16 12:52:38.858264 |
212 |
47181969 |
Tube well with Solid Platform and soak pit near Baragram School More in Baragram |
76000 |
Tube well with Solid Platform and soak pit near Baragram School More in Baragram1 |
Plinth level |
-
latitude : 23.440673500299454
Longitude : 86.21416415087879
file name : Image_11072022164406966.png
|
2022-07-11 16:44:07.037336 |
213 |
47181969 |
Tube well with Solid Platform and soak pit near Baragram School More in Baragram |
76000 |
Tube well with Solid Platform and soak pit near Baragram School More in Baragram1 |
Completion of work |
-
latitude : 23.422735976055264
Longitude : 86.20130396448076
file name : Image_01072022145610330.png
|
2022-07-01 14:56:10.418405 |
214 |
47119667 |
PCC of Dungri Kuli at Gunja |
300000 |
PCC of Dungri Kuli at Gunja1 |
Plinth level |
-
latitude : 23.422697209753096,23.42251180205494
Longitude : 86.22866149060428,86.22878478839993
file name : Image_23072022134258267.png
|
2022-07-23 13:42:58.355506 |
215 |
47119667 |
PCC of Dungri Kuli at Gunja |
300000 |
PCC of Dungri Kuli at Gunja1 |
Roof laid |
-
latitude : 23.430766970850527,23.430924508720636
Longitude : 86.21826499700546,86.21880537830293
file name : Image_30072022134802026.png
|
2022-07-30 13:48:02.147919 |
216 |
47119667 |
PCC of Dungri Kuli at Gunja |
300000 |
PCC of Dungri Kuli at Gunja1 |
Completion of work |
-
latitude : 23.422697712667286,23.422632543370128
Longitude : 86.2285415455699,86.22889752499759
file name : Image_19032022103730151.png
|
2022-03-19 10:37:30.271663 |
217 |
39067918 |
Installation of deep Tube well with solar pump near Baragram Primary School |
400000 |
Installation of deep Tube well with solar pump near Baragram Primary School1 |
Plinth level |
-
latitude : 23.44491444993764
Longitude : 86.21941214427352
file name : Image_23072022131150870.png
|
2022-07-23 13:11:50.936758 |
218 |
39067918 |
Installation of deep Tube well with solar pump near Baragram Primary School |
400000 |
Installation of deep Tube well with solar pump near Baragram Primary School1 |
Roof laid |
-
latitude : 23.444937961176038
Longitude : 86.21944416314363
file name : Image_30072022150903007.png
|
2022-07-30 15:09:03.078925 |
219 |
39067918 |
Installation of deep Tube well with solar pump near Baragram Primary School |
400000 |
Installation of deep Tube well with solar pump near Baragram Primary School1 |
Completion of work |
-
latitude : 23.444915749132633
Longitude : 86.21942203491926
file name : Image_19032022110230588.png
|
2022-03-19 11:02:30.683624 |
220 |
47120672 |
PCC at Paramanik Para in Hargara |
300000 |
PCC at Paramanik Para in Hargara1 |
Roof laid |
-
latitude : 23.44611105043441,23.446540916338563
Longitude : 86.16751081310213,86.16780132986605
file name : Image_30072022142515968.png
|
2022-07-30 14:25:16.045404 |
221 |
47120672 |
PCC at Paramanik Para in Hargara |
300000 |
PCC at Paramanik Para in Hargara1 |
Plinth level |
-
latitude : 23.446177099831402,23.446596362628043
Longitude : 86.16744199767709,86.16778858937323
file name : Image_16072022135530305.png
|
2022-07-16 13:55:30.394095 |
222 |
47120672 |
PCC at Paramanik Para in Hargara |
300000 |
PCC at Paramanik Para in Hargara1 |
Completion of work |
-
latitude : 23.45268941950053,23.446400561369956
Longitude : 86.15563399158418,86.1676745954901
file name : Image_07052022114410282.png
|
2022-05-07 11:44:10.372239 |
223 |
34923619 |
Installation of Tubewell with solid platform and soak pit near Kalicharan Mahato Bari in Baragram |
100000 |
Installation of Tubewell with solid platform and soak pit near Kalicharan Mahato Bari in Baragram1 |
Roof laid |
-
latitude : 23.44270229805261
Longitude : 86.20516022667289
file name : Image_30072022135723674.png
|
2022-07-30 13:57:23.771762 |
224 |
34923619 |
Installation of Tubewell with solid platform and soak pit near Kalicharan Mahato Bari in Baragram |
100000 |
Installation of Tubewell with solid platform and soak pit near Kalicharan Mahato Bari in Baragram1 |
Plinth level |
-
latitude : 23.435543440282345
Longitude : 86.21673395857215
file name : Image_23072022164132282.png
|
2022-07-23 16:41:32.406047 |
225 |
34923619 |
Installation of Tubewell with solid platform and soak pit near Kalicharan Mahato Bari in Baragram |
100000 |
Installation of Tubewell with solid platform and soak pit near Kalicharan Mahato Bari in Baragram1 |
Completion of work |
-
latitude : 23.435598886571825
Longitude : 86.21668777428567
file name : Image_09072022131022758.png
|
2022-07-09 13:10:22.825451 |
226 |
67723438 |
Construction of new Piped Water Supply schemes |
75000 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 23.44103434123099
Longitude : 86.17962467484176
file name : Image_17112023125400001.png
|
2023-11-17 12:54:00.092785 |
227 |
67723438 |
Construction of new Piped Water Supply schemes |
75000 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 23.44099892769009
Longitude : 86.17967396043241
file name : Image_15112023154324446.png
|
2023-11-15 15:43:24.54927 |
228 |
67723438 |
Construction of new Piped Water Supply schemes |
75000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 23.441019589081407
Longitude : 86.17965677753091
file name : Image_11112023152518026.png
|
2023-11-11 15:25:18.112217 |
229 |
34896320 |
Bhelaidih Basti Government Well repairing with Chatal at Bhelaidh |
50000 |
Bhelaidih Basti Government Well repairing with Chatal at Bhelaidh1 |
Roof laid |
-
latitude : 23.428452434018254
Longitude : 86.17832128889859
file name : Image_20082022173943112.png
|
2022-08-20 17:39:43.202619 |
230 |
34896320 |
Bhelaidih Basti Government Well repairing with Chatal at Bhelaidh |
50000 |
Bhelaidih Basti Government Well repairing with Chatal at Bhelaidh1 |
Plinth level |
-
latitude : 23.42842494137585
Longitude : 86.17831969633698
file name : Image_16052022090735841.png
|
2022-05-16 09:07:35.898013 |
231 |
34896320 |
Bhelaidih Basti Government Well repairing with Chatal at Bhelaidh |
50000 |
Bhelaidih Basti Government Well repairing with Chatal at Bhelaidh1 |
Completion of work |
-
latitude : 23.42846584506333
Longitude : 86.17834375239909
file name : Image_07052022175223642.png
|
2022-05-07 17:52:23.739003 |
232 |
34941578 |
Construction of PCC from Mukti Gope House to Bibek Mahato House at Agharpur |
100000 |
Construction of PCC from Mukti Gope House to Bibek Mahato House at Agharpur1 |
Roof laid |
-
latitude : 23.426008773967624,23.42575568240136
Longitude : 86.2029476556927,86.20295360684395
file name : Image_25092022161229540.png
|
2022-09-25 16:12:29.604246 |
233 |
34941578 |
Construction of PCC from Mukti Gope House to Bibek Mahato House at Agharpur |
100000 |
Construction of PCC from Mukti Gope House to Bibek Mahato House at Agharpur1 |
Plinth level |
-
latitude : 23.341522752307355,23.42573472764343
Longitude : 86.34667701087892,86.2029336579144
file name : Image_05082022165439629.png
|
2022-08-05 16:54:39.716917 |
234 |
34941578 |
Construction of PCC from Mukti Gope House to Bibek Mahato House at Agharpur |
100000 |
Construction of PCC from Mukti Gope House to Bibek Mahato House at Agharpur1 |
Completion of work |
-
latitude : 23.426114763133228,23.425689423456788
Longitude : 86.2029873020947,86.20291035622358
file name : Image_08032022100256457.png
|
2022-03-08 10:02:56.539938 |
235 |
34942159 |
Construction of PCC from Main Road to Kamal Gope House near Prmy School at Agharpur |
80000 |
Construction of PCC from Main Road to Kamal Gope House near Prmy School at Agharpur1 |
Roof laid |
-
latitude : 23.424990917555988,23.424889789894223
Longitude : 86.20293407700956,86.20276015251875
file name : Image_25092022160637472.png
|
2022-09-25 16:06:37.537232 |
236 |
34942159 |
Construction of PCC from Main Road to Kamal Gope House near Prmy School at Agharpur |
80000 |
Construction of PCC from Main Road to Kamal Gope House near Prmy School at Agharpur1 |
Plinth level |
-
latitude : 23.424957431852818,23.42485207132995
Longitude : 86.20293541811407,86.20273961685598
file name : Image_05082022165950662.png
|
2022-08-05 16:59:50.745864 |
237 |
34942159 |
Construction of PCC from Main Road to Kamal Gope House near Prmy School at Agharpur |
80000 |
Construction of PCC from Main Road to Kamal Gope House near Prmy School at Agharpur1 |
Completion of work |
-
latitude : 23.424930023029447,23.42484176158905
Longitude : 86.20288923382759,86.20267842896283
file name : Image_12022022151701082.png
|
2022-02-12 15:17:01.183967 |
238 |
34938929 |
Installation of Deep Tuebwell with Solar Pump near Bijay Bandh at Bartard |
480000 |
Installation of Deep Tuebwell with Solar Pump near Bijay Bandh at Bartard 1 |
Roof laid |
-
latitude : 23.424749644473195
Longitude : 86.22183786705136
file name : Image_17092022154045223.png
|
2022-09-17 15:40:45.330774 |
239 |
34938929 |
Installation of Deep Tuebwell with Solar Pump near Bijay Bandh at Bartard |
480000 |
Installation of Deep Tuebwell with Solar Pump near Bijay Bandh at Bartard 1 |
Completion of work |
-
latitude : 23.42455707024783
Longitude : 86.22181406244636
file name : Image_08032022092617046.png
|
2022-03-08 09:26:17.147796 |
240 |
34938929 |
Installation of Deep Tuebwell with Solar Pump near Bijay Bandh at Bartard |
480000 |
Installation of Deep Tuebwell with Solar Pump near Bijay Bandh at Bartard 1 |
Plinth level |
-
latitude : 23.42468858230859
Longitude : 86.22181322425604
file name : Image_27082022155127032.png
|
2022-08-27 15:51:27.113006 |
241 |
47173914 |
Tube well with Solid Platform and soak pit near Nitai Karmakar house at Selani |
76000 |
Tube well with Solid Platform and soak pit near Nitai Karmakar house at Selani1 |
Roof laid |
-
latitude : 23.448987007141113
Longitude : 86.195630421862
file name : Image_24092022163113466.png
|
2022-09-24 16:31:13.555137 |
242 |
47173914 |
Tube well with Solid Platform and soak pit near Nitai Karmakar house at Selani |
76000 |
Tube well with Solid Platform and soak pit near Nitai Karmakar house at Selani1 |
Completion of work |
-
latitude : 23.448970369063318
Longitude : 86.19570007547736
file name : Image_17092022152137542.png
|
2022-09-17 15:21:37.621205 |
243 |
47173914 |
Tube well with Solid Platform and soak pit near Nitai Karmakar house at Selani |
76000 |
Tube well with Solid Platform and soak pit near Nitai Karmakar house at Selani1 |
Plinth level |
-
latitude : 23.448963747359812
Longitude : 86.1956671345979
file name : Image_22092022164250428.png
|
2022-09-22 16:42:50.4855 |
244 |
47109271 |
PCC Raod from Kanchan Mahato house to Tube well at Durma |
150000 |
PCC Raod from Kanchan Mahato house to Tube well at Durma1 |
Plinth level |
-
latitude : 23.324825121089816,23.433503452688456
Longitude : 86.35607563890517,86.18169416673481
file name : Image_25092022155033270.png
|
2022-09-25 15:50:33.356416 |
245 |
47109271 |
PCC Raod from Kanchan Mahato house to Tube well at Durma |
150000 |
PCC Raod from Kanchan Mahato house to Tube well at Durma1 |
Roof laid |
-
latitude : 23.43347013462335,23.43352658674121
Longitude : 86.18197839707136,86.18165418505669
file name : Image_27092022175024685.png
|
2022-09-27 17:50:24.771275 |
246 |
47109271 |
PCC Raod from Kanchan Mahato house to Tube well at Durma |
150000 |
PCC Raod from Kanchan Mahato house to Tube well at Durma1 |
Completion of work |
-
latitude : 23.433449640870094,23.433416113257408
Longitude : 86.18198225274682,86.18178829550743
file name : Image_12092022152317464.png
|
2022-09-12 15:23:17.531313 |
247 |
47182837 |
Purchasing of Tube well parts |
448379 |
Purchasing of Tube well parts1 |
Completion of work |
-
latitude : 23.438772191293538
Longitude : 86.21644377708435
file name : Image_27092022180942103.png
|
2022-09-27 18:09:42.173486 |
248 |
47175598 |
Tube well with Solid Platform and soak pit near Santosh Gorai house in Kokiara |
76000 |
Tube well with Solid Platform and soak pit near Santosh Gorai house in Kokiara1 |
Plinth level |
-
latitude : 23.45192302018404
Longitude : 86.23483308590949
file name : Image_28092022094636775.png
|
2022-09-28 09:46:36.864853 |
249 |
47175598 |
Tube well with Solid Platform and soak pit near Santosh Gorai house in Kokiara |
76000 |
Tube well with Solid Platform and soak pit near Santosh Gorai house in Kokiara1 |
Completion of work |
-
latitude : 23.451936137862504
Longitude : 86.23487918637693
file name : Image_12092022175226255.png
|
2022-09-12 17:52:26.367716 |
250 |
47110700 |
Protection Wall near land of Kamal Gorain in Ramamoti |
100000 |
Protection Wall near land of Kamal Gorain in Ramamoti1 |
Plinth level |
-
latitude : 23.437452921643853,23.43747785780579
Longitude : 86.2066812068224,86.20678279548883
file name : Image_28092022090626013.png
|
2022-09-28 09:06:26.077823 |
251 |
47110700 |
Protection Wall near land of Kamal Gorain in Ramamoti |
100000 |
Protection Wall near land of Kamal Gorain in Ramamoti1 |
Roof laid |
-
latitude : 23.43748573679477,23.437500656582415
Longitude : 86.20666150934994,86.20677290484309
file name : Image_28092022102727295.png
|
2022-09-28 10:27:27.369345 |
252 |
47110700 |
Protection Wall near land of Kamal Gorain in Ramamoti |
100000 |
Protection Wall near land of Kamal Gorain in Ramamoti1 |
Completion of work |
-
latitude : 23.437440767884254,23.437447515316308
Longitude : 86.20669713243842,86.20681791566312
file name : Image_12092022140718612.png
|
2022-09-12 14:07:18.696854 |
253 |
47182278 |
Tube well with Solid Platform and soak pit near Baragram Amgaria |
76000 |
Tube well with Solid Platform and soak pit near Baragram Amgaria1 |
Completion of work |
-
latitude : 23.441087272949517
Longitude : 86.22073891572654
file name : Image_17092022143802500.png
|
2022-09-17 14:38:02.581408 |
254 |
47182278 |
Tube well with Solid Platform and soak pit near Baragram Amgaria |
76000 |
Tube well with Solid Platform and soak pit near Baragram Amgaria1 |
Plinth level |
-
latitude : 23.441127254627645
Longitude : 86.2207517400384
file name : Image_27092022162913758.png
|
2022-09-27 16:29:13.824307 |
255 |
47182278 |
Tube well with Solid Platform and soak pit near Baragram Amgaria |
76000 |
Tube well with Solid Platform and soak pit near Baragram Amgaria1 |
Roof laid |
-
latitude : 23.443577494472265
Longitude : 86.20862614363432
file name : Image_28092022092804745.png
|
2022-09-28 09:28:04.824134 |
256 |
47181332 |
Tube well with Solid Platform and soak pit near shibmandir Para in Hargara |
76000 |
Tube well with Solid Platform and soak pit near shibmandir Para in Hargara1 |
Roof laid |
-
latitude : 23.44768018461764
Longitude : 86.16859040223062
file name : Image_29092022101102597.png
|
2022-09-29 10:11:02.668741 |
257 |
47181332 |
Tube well with Solid Platform and soak pit near shibmandir Para in Hargara |
76000 |
Tube well with Solid Platform and soak pit near shibmandir Para in Hargara1 |
Plinth level |
-
latitude : 23.44773378688842
Longitude : 86.16858654655516
file name : Image_27092022171155721.png
|
2022-09-27 17:11:55.782974 |
258 |
47181332 |
Tube well with Solid Platform and soak pit near shibmandir Para in Hargara |
76000 |
Tube well with Solid Platform and soak pit near shibmandir Para in Hargara1 |
Completion of work |
-
latitude : 23.447632156312466
Longitude : 86.16859274916351
file name : Image_12092022143631762.png
|
2022-09-12 14:36:31.857577 |
259 |
47181556 |
Tube well with Solid Platform and soak pit near Rajen Mahato house in Hargara |
76000 |
Tube well with Solid Platform and soak pit near Rajen Mahato house in Hargara1 |
Roof laid |
-
latitude : 23.442980954423547
Longitude : 86.16439601406455
file name : Image_29092022101637478.png
|
2022-09-29 10:16:37.551353 |
260 |
47181556 |
Tube well with Solid Platform and soak pit near Rajen Mahato house in Hargara |
76000 |
Tube well with Solid Platform and soak pit near Rajen Mahato house in Hargara1 |
Plinth level |
-
latitude : 23.442996167577803
Longitude : 86.16435460746288
file name : Image_27092022172523282.png
|
2022-09-27 17:25:23.355678 |
261 |
47181556 |
Tube well with Solid Platform and soak pit near Rajen Mahato house in Hargara |
76000 |
Tube well with Solid Platform and soak pit near Rajen Mahato house in Hargara1 |
Completion of work |
-
latitude : 23.442923831753433
Longitude : 86.16439802572131
file name : Image_12092022145025360.png
|
2022-09-12 14:50:25.464809 |
262 |
47120001 |
PCC from Haren Mahato Khamar Bari to Bheria Primary School at Bheria |
325000 |
PCC from Haren Mahato Khamar Bari to Bheria Primary School at Bheria1 |
Plinth level |
-
latitude : 23.38885481469333,23.462200197391212
Longitude : 86.24360022135079,86.17590461857617
file name : Image_27102022113158797.png
|
2022-10-27 11:31:58.883549 |
263 |
47120001 |
PCC from Haren Mahato Khamar Bari to Bheria Primary School at Bheria |
325000 |
PCC from Haren Mahato Khamar Bari to Bheria Primary School at Bheria1 |
Completion of work |
-
latitude : 23.462124718353152,23.462233683094382
Longitude : 86.17633016780019,86.17594543844461
file name : Image_26102022113131830.png
|
2022-10-26 11:31:34.359869 |
264 |
66509433 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.43690700829029
Longitude : 86.19295894168317
file name : Image_05062023143315612.png
|
2023-06-05 14:33:15.723683 |
265 |
66509433 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.43689741101116
Longitude : 86.19295751675963
file name : Image_23042023090455079.png
|
2023-04-23 09:04:55.164721 |
266 |
66509433 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.436932028271258
Longitude : 86.19301141239703
file name : Image_11042023074124420.png
|
2023-04-11 07:41:24.504503 |
267 |
47102692 |
PCC Road from Kalindi Para to Radhanath Mahato House at Kusumtikri |
300000 |
PCC Road from Kalindi Para to Radhanath Mahato House at Kusumtikri1 |
Completion of work |
-
latitude : 23.428730838932097,23.428682181984186
Longitude : 86.18329008109868,86.18287643417716
file name : Image_06112022140934748.png
|
2022-11-06 14:09:34.812461 |
268 |
47102692 |
PCC Road from Kalindi Para to Radhanath Mahato House at Kusumtikri |
300000 |
PCC Road from Kalindi Para to Radhanath Mahato House at Kusumtikri1 |
Plinth level |
-
latitude : 23.42338716611266,23.42338716611266
Longitude : 86.19170106947422,86.19170106947422
file name : Image_08112022155516645.png
|
2022-11-08 15:55:16.738697 |
269 |
47102692 |
PCC Road from Kalindi Para to Radhanath Mahato House at Kusumtikri |
300000 |
PCC Road from Kalindi Para to Radhanath Mahato House at Kusumtikri1 |
Roof laid |
-
latitude : 23.428702759556472,23.42867648229003
Longitude : 86.18327759206295,86.1828517075628
file name : Image_13112022143821266.png
|
2022-11-13 14:38:21.345423 |
270 |
47120405 |
PCC road from Harimandir to Dinabandhu house at Shilfor |
225000 |
PCC road from Harimandir to Dinabandhu house at Shilfor1 |
Completion of work |
-
latitude : 23.43973129056394,23.43929128255695
Longitude : 86.17819480597973,86.17786640301347
file name : Image_06112022143631176.png
|
2022-11-06 14:36:31.251994 |
271 |
47120405 |
PCC road from Harimandir to Dinabandhu house at Shilfor |
225000 |
PCC road from Harimandir to Dinabandhu house at Shilfor1 |
Plinth level |
-
latitude : 23.43966310378164,23.439262323081493
Longitude : 86.17822682484984,86.17791996337473
file name : Image_13112022150404910.png
|
2022-11-13 15:04:04.965988 |
272 |
47120405 |
PCC road from Harimandir to Dinabandhu house at Shilfor |
225000 |
PCC road from Harimandir to Dinabandhu house at Shilfor1 |
Roof laid |
-
latitude : 23.44883910845965,23.439273010008037
Longitude : 86.20289007201791,86.17787562310696
file name : Image_24112022172221074.png
|
2022-11-24 17:22:21.137244 |
273 |
47123224 |
Protection wall at Amgaria in Baragram |
130000 |
Protection wall at Amgaria in Baragram1 |
Completion of work |
-
latitude : 23.440455738455057,23.44076934736222
Longitude : 86.22123663313687,86.22125314548612
file name : Image_08112022145400750.png
|
2022-11-08 14:54:00.837499 |
274 |
47123224 |
Protection wall at Amgaria in Baragram |
130000 |
Protection wall at Amgaria in Baragram1 |
Plinth level |
-
latitude : 23.440458714030683,23.440749440342188
Longitude : 86.22122741304338,86.22123286128044
file name : Image_29112022170322889.png
|
2022-11-29 17:03:22.954265 |
275 |
47123224 |
Protection wall at Amgaria in Baragram |
130000 |
Protection wall at Amgaria in Baragram1 |
Roof laid |
-
latitude : 23.4251043247059,23.4251043247059
Longitude : 86.20298478752375,86.20298478752375
file name : Image_30112022164445488.png
|
2022-11-30 16:44:45.571958 |
276 |
47183290 |
Remuneration to Tube well mechanic |
120000 |
Remuneration to Tube well mechanic1 |
Completion of work |
-
latitude : 23.438785853795707
Longitude : 86.2164478842169
file name : Image_29112022161949120.png
|
2022-11-29 16:19:49.228918 |
277 |
47104677 |
Construction of Cremation Ghat at Chaitandih |
300000 |
Construction of Cremation Ghat at Chaitandih1 |
Roof laid |
-
latitude : 23.44439967535436
Longitude : 86.18717048317194
file name : Image_27092023135129741.png
|
2023-09-27 13:51:29.853107 |
278 |
47104677 |
Construction of Cremation Ghat at Chaitandih |
300000 |
Construction of Cremation Ghat at Chaitandih1 |
Completion of work |
-
latitude : 23.44442469533533
Longitude : 86.1871241312474
file name : Image_16072022132209116.png
|
2022-07-16 13:22:09.200999 |
279 |
47104677 |
Construction of Cremation Ghat at Chaitandih |
300000 |
Construction of Cremation Ghat at Chaitandih1 |
Plinth level |
-
latitude : 23.4387689223513
Longitude : 86.17412849329412
file name : Image_02122022144634340.png
|
2022-12-02 14:46:34.439829 |
280 |
47176110 |
Tube well with Solid Platform and soak pit near Khariram Mahato house in Shilfore |
76000 |
Tube well with Solid Platform and soak pit near Khariram Mahato house in Shilfore1 |
Plinth level |
-
latitude : 23.43828692100942
Longitude : 86.17719165980816
file name : Image_24122022155615532.png
|
2022-12-24 15:56:15.616538 |
281 |
47176110 |
Tube well with Solid Platform and soak pit near Khariram Mahato house in Shilfore |
76000 |
Tube well with Solid Platform and soak pit near Khariram Mahato house in Shilfore1 |
Roof laid |
-
latitude : 23.438247903250158
Longitude : 86.17718671448529
file name : Image_07012023162115938.png
|
2023-01-07 16:21:16.009737 |
282 |
47176110 |
Tube well with Solid Platform and soak pit near Khariram Mahato house in Shilfore |
76000 |
Tube well with Solid Platform and soak pit near Khariram Mahato house in Shilfore1 |
Completion of work |
-
latitude : 23.4382836939767
Longitude : 86.17720942944288
file name : Image_17122022134420282.png
|
2022-12-17 13:44:20.375519 |
283 |
34878647 |
Construction of Culvert at Bheria Bandh at Bheria |
50000 |
Construction of Culvert at Bheria Bandh at Bheria1 |
Plinth level |
-
latitude : 23.46203985158354,23.46206839196384
Longitude : 86.17730640806258,86.17733557708561
file name : Image_24122022152517254.png
|
2022-12-24 15:25:17.340538 |
284 |
34878647 |
Construction of Culvert at Bheria Bandh at Bheria |
50000 |
Construction of Culvert at Bheria Bandh at Bheria1 |
Roof laid |
-
latitude : 23.462021411396563,23.462058291770518
Longitude : 86.17728159762919,86.17731671780348
file name : Image_07012023151427504.png
|
2023-01-07 15:14:27.57664 |
285 |
34878647 |
Construction of Culvert at Bheria Bandh at Bheria |
50000 |
Construction of Culvert at Bheria Bandh at Bheria1 |
Completion of work |
-
latitude : 23.462002258747816,23.46204148605466
Longitude : 86.17727832868695,86.1773292068392
file name : Image_17122022132239992.png
|
2022-12-17 13:22:40.0642 |
286 |
47176845 |
Tube well with Solid Platform and soak pit near Bhajahari Mahato house in Hargara |
76000 |
Tube well with Solid Platform and soak pit near Bhajahari Mahato house in Hargara1 |
Roof laid |
-
latitude : 23.437624792568386
Longitude : 86.16661805659533
file name : Image_04022023164707148.png
|
2023-02-04 16:47:07.238763 |
287 |
47176845 |
Tube well with Solid Platform and soak pit near Bhajahari Mahato house in Hargara |
76000 |
Tube well with Solid Platform and soak pit near Bhajahari Mahato house in Hargara1 |
Completion of work |
-
latitude : 23.43772126827389
Longitude : 86.16663138382137
file name : Image_24122022154229103.png
|
2022-12-24 15:42:29.175932 |
288 |
47176845 |
Tube well with Solid Platform and soak pit near Bhajahari Mahato house in Hargara |
76000 |
Tube well with Solid Platform and soak pit near Bhajahari Mahato house in Hargara1 |
Plinth level |
-
latitude : 23.437738618813455
Longitude : 86.16667572408915
file name : Image_07012023160636249.png
|
2023-01-07 16:06:36.317228 |
289 |
47110096 |
Culvert near land of Krishnapada Mahato at Ratnadih |
225000 |
Culvert near land of Krishnapada Mahato at Ratnadih1 |
Plinth level |
-
latitude : 23.438956174068153,23.448657556436956
Longitude : 86.21624822728336,86.2023310828954
file name : Image_14012023162219141.png
|
2023-01-14 16:22:19.201603 |
290 |
47110096 |
Culvert near land of Krishnapada Mahato at Ratnadih |
225000 |
Culvert near land of Krishnapada Mahato at Ratnadih1 |
Roof laid |
-
latitude : 23.448557518422604,23.448574701324105
Longitude : 86.20239361189306,86.20234449394047
file name : Image_04022023171834446.png
|
2023-02-04 17:18:34.541125 |
291 |
47110096 |
Culvert near land of Krishnapada Mahato at Ratnadih |
225000 |
Culvert near land of Krishnapada Mahato at Ratnadih1 |
Completion of work |
-
latitude : 23.448620424605906,23.448628848418593
Longitude : 86.20239604264498,86.20232479646802
file name : Image_07012023145627506.png
|
2023-01-07 14:56:27.588291 |
292 |
57909400 |
PCC Road from Shiv Mandir to Gunja Primary School |
200000 |
PCC Road from Shiv Mandir to Gunja Primary School1 |
Roof laid |
-
latitude : 23.405229323543608,23.405229323543608
Longitude : 86.20070675387979,86.20070675387979
file name : Image_23052023094235185.png
|
2023-05-23 09:42:35.271114 |
293 |
57909400 |
PCC Road from Shiv Mandir to Gunja Primary School |
200000 |
PCC Road from Shiv Mandir to Gunja Primary School1 |
Plinth level |
-
latitude : 23.421705588698387,23.42200411017984
Longitude : 86.22942206449807,86.22959380969405
file name : Image_21052023123459906.png
|
2023-05-21 12:35:00.002088 |
294 |
57909400 |
PCC Road from Shiv Mandir to Gunja Primary School |
200000 |
PCC Road from Shiv Mandir to Gunja Primary School1 |
Completion of work |
-
latitude : 23.421981395222247,23.421665816567838,23.42166854068637
Longitude : 86.22962633147836,86.22949699871242,86.22949993237853
file name : Image_21052023121745618.png
|
2023-05-21 12:17:45.699879 |
295 |
39063760 |
Installation of Tubewell with solid Platform and soak pit near Kusturi Bandh at Kokiara |
100000 |
Installation of Tubewell with solid Platform and soak pit near Kusturi Bandh at Kokiara1 |
Plinth level |
-
latitude : 23.450696622021496
Longitude : 86.23562157154083
file name : Image_14022022170301074.png
|
2022-02-14 17:03:01.160428 |
296 |
39063760 |
Installation of Tubewell with solid Platform and soak pit near Kusturi Bandh at Kokiara |
100000 |
Installation of Tubewell with solid Platform and soak pit near Kusturi Bandh at Kokiara1 |
Roof laid |
-
latitude : 23.450674200430512
Longitude : 86.23562064953148
file name : Image_19022022160339628.png
|
2022-02-19 16:03:39.722975 |
297 |
39063760 |
Installation of Tubewell with solid Platform and soak pit near Kusturi Bandh at Kokiara |
100000 |
Installation of Tubewell with solid Platform and soak pit near Kusturi Bandh at Kokiara1 |
Completion of work |
-
latitude : 23.450652617029846
Longitude : 86.23558125458658
file name : Image_26012022124009613.png
|
2022-01-26 12:40:09.745024 |
298 |
47174697 |
Tube well with Solid Platform and soak pit near Sayer Bandh in Baragram |
76000 |
Tube well with Solid Platform and soak pit near Sayer Bandh in Baragram1 |
Plinth level |
-
latitude : 23.444908875972033
Longitude : 86.22117368504405
file name : Image_27022023165838624.png
|
2023-02-27 16:58:38.69816 |
299 |
47174697 |
Tube well with Solid Platform and soak pit near Sayer Bandh in Baragram |
76000 |
Tube well with Solid Platform and soak pit near Sayer Bandh in Baragram1 |
Plinth level |
-
latitude : 23.44489655457437
Longitude : 86.22113965451717
file name : Image_25022023125524567.png
|
2023-02-25 12:55:24.644538 |
300 |
47174697 |
Tube well with Solid Platform and soak pit near Sayer Bandh in Baragram |
76000 |
Tube well with Solid Platform and soak pit near Sayer Bandh in Baragram1 |
Completion of work |
-
latitude : 23.444891232065856
Longitude : 86.2211296800524
file name : Image_22022023093441995.png
|
2023-02-22 09:34:42.077536 |
301 |
34920628 |
Installation of Tube well with solid platform and soak pit at Manakchita |
100000 |
Installation of Tube well with solid platform and soak pit at Manakchita1 |
Plinth level |
-
latitude : 23.438637033104897
Longitude : 86.22599470429122
file name : Image_14022022173448433.png
|
2022-02-14 17:34:48.557758 |
302 |
34920628 |
Installation of Tube well with solid platform and soak pit at Manakchita |
100000 |
Installation of Tube well with solid platform and soak pit at Manakchita1 |
Roof laid |
-
latitude : 23.438600529916584
Longitude : 86.2259904295206
file name : Image_19022022161857315.png
|
2022-02-19 16:18:57.422742 |
303 |
34920628 |
Installation of Tube well with solid platform and soak pit at Manakchita |
100000 |
Installation of Tube well with solid platform and soak pit at Manakchita1 |
Completion of work |
-
latitude : 23.438616497442126
Longitude : 86.22598104178905
file name : Image_26012022120448259.png
|
2022-01-26 12:04:48.350219 |
304 |
66509279 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.44753115437925
Longitude : 86.23176338151097
file name : Image_21032023175109526.png
|
2023-03-21 17:51:09.600046 |
305 |
66509279 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.447519880719483
Longitude : 86.23179095797241
file name : Image_24032023081013094.png
|
2023-03-24 08:10:13.170839 |
306 |
66509279 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.44759355764836
Longitude : 86.23172708787024
file name : Image_01032023175141512.png
|
2023-03-01 17:51:41.58128 |
307 |
66509279 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.454879191704094
Longitude : 86.22557016089559
file name : Image_25022023083840655.png
|
2023-02-25 08:38:40.752796 |
308 |
47108699 |
Protection Wall ll from Biswanath house to Sadhan's wall in Baragram |
70000 |
Protection Wall ll from Biswanath house to Sadhan's wall in Baragram1 |
Roof laid |
-
latitude : 23.44525743741542,23.445219635032117
Longitude : 86.22092507779598,86.22092356905341
file name : Image_02032023172632567.png
|
2023-03-02 17:26:32.640984 |
309 |
47108699 |
Protection Wall ll from Biswanath house to Sadhan's wall in Baragram |
70000 |
Protection Wall ll from Biswanath house to Sadhan's wall in Baragram1 |
Plinth level |
-
latitude : 23.445280278101563,23.445235854014754
Longitude : 86.22090420685709,86.22092013247311
file name : Image_27022023174744224.png
|
2023-02-27 17:47:44.31837 |
310 |
47108699 |
Protection Wall ll from Biswanath house to Sadhan's wall in Baragram |
70000 |
Protection Wall ll from Biswanath house to Sadhan's wall in Baragram1 |
Completion of work |
-
latitude : 23.445281786844134,23.445205804891884
Longitude : 86.22093756683171,86.22094326652586
file name : Image_04022023153304564.png
|
2023-02-04 15:33:04.65255 |
311 |
34920014 |
Installation of Tube well with solid platform and soak pit at Ansary Para in Baragram |
100000 |
Installation of Tube well with solid platform and soak pit at Ansary Para in Baragram1 |
Completion of work |
-
latitude : 23.44223810825497
Longitude : 86.21903805993497
file name : Image_12022022160421711.png
|
2022-02-12 16:04:21.783026 |
312 |
34920014 |
Installation of Tube well with solid platform and soak pit at Ansary Para in Baragram |
100000 |
Installation of Tube well with solid platform and soak pit at Ansary Para in Baragram1 |
Plinth level |
-
latitude : 23.442375571466982
Longitude : 86.2190627027303
file name : Image_25022022152651617.png
|
2022-02-25 15:26:51.734765 |
313 |
34920014 |
Installation of Tube well with solid platform and soak pit at Ansary Para in Baragram |
100000 |
Installation of Tube well with solid platform and soak pit at Ansary Para in Baragram1 |
Roof laid |
-
latitude : 23.44226681627333
Longitude : 86.21905306354165
file name : Image_19032022110631010.png
|
2022-03-19 11:06:31.102719 |
314 |
57954362 |
Tube well with soak pit and solid platform near Kalindi Para Bedi in Silfore |
76000 |
Tube well with soak pit and solid platform near Kalindi Para Bedi in Silfore1 |
Roof laid |
-
latitude : 23.442002618685365
Longitude : 86.17910038679838
file name : Image_05032023171106427.png
|
2023-03-05 17:11:06.490743 |
315 |
57954362 |
Tube well with soak pit and solid platform near Kalindi Para Bedi in Silfore |
76000 |
Tube well with soak pit and solid platform near Kalindi Para Bedi in Silfore1 |
Plinth level |
-
latitude : 23.43867512885481
Longitude : 86.21632969938219
file name : Image_28022023125241014.png
|
2023-02-28 12:52:41.087085 |
316 |
57954362 |
Tube well with soak pit and solid platform near Kalindi Para Bedi in Silfore |
76000 |
Tube well with soak pit and solid platform near Kalindi Para Bedi in Silfore1 |
Completion of work |
-
latitude : 23.441908112727106
Longitude : 86.17915193550289
file name : Image_21022023170542583.png
|
2023-02-21 17:05:42.65916 |
317 |
47148622 |
Construction of Bathing Ghat with dustbin at Jhala Garia in Baragram |
80000 |
Construction of Bathing Ghat with dustbin at Jhala Garia in Baragram1 |
Roof laid |
-
latitude : 23.44425328541547
Longitude : 86.21920343488455
file name : Image_11032023172315050.png
|
2023-03-11 17:23:15.113537 |
318 |
47148622 |
Construction of Bathing Ghat with dustbin at Jhala Garia in Baragram |
80000 |
Construction of Bathing Ghat with dustbin at Jhala Garia in Baragram1 |
Plinth level |
-
latitude : 23.444264600984752
Longitude : 86.21925037354231
file name : Image_06032023151950808.png
|
2023-03-06 15:19:50.894948 |
319 |
47148622 |
Construction of Bathing Ghat with dustbin at Jhala Garia in Baragram |
80000 |
Construction of Bathing Ghat with dustbin at Jhala Garia in Baragram1 |
Completion of work |
-
latitude : 23.444286519661546
Longitude : 86.2192923668772
file name : Image_17022023101507166.png
|
2023-02-17 10:15:07.231064 |
320 |
34901576 |
Construction of PCC from Bansgaria to Rasaraj Mahato House at Kusumtikri |
320000 |
Construction of PCC from Bansgaria to Rasaraj Mahato House at Kusumtikri1 |
Completion of work |
-
latitude : 23.428658293560147,23.42856709845364
Longitude : 86.18322864174843,86.1836773250252
file name : Image_07012022174440788.png
|
2022-01-07 17:44:40.979394 |
321 |
34901576 |
Construction of PCC from Bansgaria to Rasaraj Mahato House at Kusumtikri |
320000 |
Construction of PCC from Bansgaria to Rasaraj Mahato House at Kusumtikri1 |
Plinth level |
-
latitude : 23.428695173934102,23.428655485622585
Longitude : 86.18327080272138,86.18360381573439
file name : Image_12032022113328345.png
|
2022-03-12 11:33:28.435275 |
322 |
34901576 |
Construction of PCC from Bansgaria to Rasaraj Mahato House at Kusumtikri |
320000 |
Construction of PCC from Bansgaria to Rasaraj Mahato House at Kusumtikri1 |
Roof laid |
-
latitude : 23.428713236935437,23.428670950233936
Longitude : 86.18327415548265,86.18358663283288
file name : Image_18032022175825099.png
|
2022-03-18 17:58:25.207904 |
323 |
34876010 |
Installation of Tubewell with solid platforma and soak pit at Bheria near Dinabandhu Mahato House |
100000 |
Installation of Tubewell with solid platforma and soak pit at Bheria near Dinabandhu Mahato House 1 |
Roof laid |
-
latitude : 23.45904093235731
Longitude : 86.17413000203669
file name : Image_24042022104047110.png
|
2022-04-24 10:40:47.229233 |
324 |
34876010 |
Installation of Tubewell with solid platforma and soak pit at Bheria near Dinabandhu Mahato House |
100000 |
Installation of Tubewell with solid platforma and soak pit at Bheria near Dinabandhu Mahato House 1 |
Plinth level |
-
latitude : 23.459028024226427
Longitude : 86.17411340586841
file name : Image_26012022174110660.png
|
2022-01-26 17:41:10.790078 |
325 |
34876010 |
Installation of Tubewell with solid platforma and soak pit at Bheria near Dinabandhu Mahato House |
100000 |
Installation of Tubewell with solid platforma and soak pit at Bheria near Dinabandhu Mahato House 1 |
Completion of work |
-
latitude : 23.44203857704997
Longitude : 86.16818807087839
file name : Image_12012022144845821.png
|
2022-01-12 14:48:45.941565 |
326 |
66508695 |
Creation of drainage channel for management of grey water |
125000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.44409465789795
Longitude : 86.22072952799499
file name : Image_25032023175259667.png
|
2023-03-25 17:52:59.738304 |
327 |
66508695 |
Creation of drainage channel for management of grey water |
125000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.444091975688934
Longitude : 86.22072089463472
file name : Image_11032023170951468.png
|
2023-03-11 17:09:51.536577 |
328 |
66508695 |
Creation of drainage channel for management of grey water |
125000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.444090173579752
Longitude : 86.22073388658464
file name : Image_16032023161517591.png
|
2023-03-16 16:15:17.670141 |
329 |
57912097 |
Solar repairing at Kahyer Garah in Hargara |
50000 |
Solar repairing at Kahyer Garah in Hargara1 |
Roof laid |
-
latitude : 23.44707019161433
Longitude : 86.16536085493863
file name : Image_25032023164509694.png
|
2023-03-25 16:45:09.760311 |
330 |
57912097 |
Solar repairing at Kahyer Garah in Hargara |
50000 |
Solar repairing at Kahyer Garah in Hargara1 |
Plinth level |
-
latitude : 23.44706210307777
Longitude : 86.16538717411458
file name : Image_25032023163848743.png
|
2023-03-25 16:38:48.82044 |
331 |
57912097 |
Solar repairing at Kahyer Garah in Hargara |
50000 |
Solar repairing at Kahyer Garah in Hargara1 |
Completion of work |
-
latitude : 23.44699735287577
Longitude : 86.16535037755966
file name : Image_08032023111226690.png
|
2023-03-08 11:12:26.771776 |
332 |
57908873 |
PCC road from Jahirthan to Primary School in Bheria |
300000 |
PCC road from Jahirthan to Primary School in Bheria1 |
Roof laid |
-
latitude : 23.461985704489052,23.46105359494686
Longitude : 86.17511009797454,86.17471958510578
file name : Image_25042023152318999.png
|
2023-04-25 15:23:19.105247 |
333 |
57908873 |
PCC road from Jahirthan to Primary School in Bheria |
300000 |
PCC road from Jahirthan to Primary School in Bheria1 |
Plinth level |
-
latitude : 23.46201587934047,23.4610584564507
Longitude : 86.17514689452946,86.17477281019092
file name : Image_23042023094744569.png
|
2023-04-23 09:47:44.661492 |
334 |
57908873 |
PCC road from Jahirthan to Primary School in Bheria |
300000 |
PCC road from Jahirthan to Primary School in Bheria1 |
Completion of work |
-
latitude : 23.461822299286723,23.461089259944856
Longitude : 86.17507196031511,86.17470365948975
file name : Image_08032023100455036.png
|
2023-03-08 10:04:55.108138 |
335 |
57911060 |
PCC Road from Ramkrishna Mahato house to Jagabandhu Mahato house in Hargara |
150000 |
PCC Road from Ramkrishna Mahato house to Jagabandhu Mahato house in Hargara1 |
Roof laid |
-
latitude : 23.43805130571127,23.438246897421777
Longitude : 86.16826736368239,86.16865443997085
file name : Image_17042023174846163.png
|
2023-04-17 17:48:46.251074 |
336 |
57911060 |
PCC Road from Ramkrishna Mahato house to Jagabandhu Mahato house in Hargara |
150000 |
PCC Road from Ramkrishna Mahato house to Jagabandhu Mahato house in Hargara1 |
Plinth level |
-
latitude : 23.437998332083225,23.43821056187153
Longitude : 86.16830910556018,86.16856819018722
file name : Image_11042023152140078.png
|
2023-04-11 15:21:40.168739 |
337 |
57911060 |
PCC Road from Ramkrishna Mahato house to Jagabandhu Mahato house in Hargara |
150000 |
PCC Road from Ramkrishna Mahato house to Jagabandhu Mahato house in Hargara1 |
Completion of work |
-
latitude : 23.43805897515267,23.43821408227086
Longitude : 86.16824909113348,86.16863574832678
file name : Image_08032023101943430.png
|
2023-03-08 10:19:43.513664 |
338 |
66949433 |
Construction of Cultural floor near Shiv Mandir at Gunja |
59000 |
Construction of Cultural floor near Shiv Mandir at Gunja1 |
Roof laid |
-
latitude : 23.4221720835194
Longitude : 86.23005573637784
file name : Image_03052023153326863.png
|
2023-05-03 15:33:26.962604 |
339 |
66949433 |
Construction of Cultural floor near Shiv Mandir at Gunja |
59000 |
Construction of Cultural floor near Shiv Mandir at Gunja1 |
Plinth level |
-
latitude : 23.42214019037783
Longitude : 86.23002036474645
file name : Image_29042023174751385.png
|
2023-04-29 17:47:51.477903 |
340 |
66949433 |
Construction of Cultural floor near Shiv Mandir at Gunja |
59000 |
Construction of Cultural floor near Shiv Mandir at Gunja1 |
Completion of work |
-
latitude : 23.422139310278
Longitude : 86.22999094426632
file name : Image_29042023105606523.png
|
2023-04-29 10:56:06.653363 |
341 |
66949508 |
Creation of a new source of drinking water |
76000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.4489531442523
Longitude : 86.21196096763015
file name : Image_05052023133707995.png
|
2023-05-05 13:37:08.091627 |
342 |
66949508 |
Creation of a new source of drinking water |
76000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.44898541457951
Longitude : 86.21199156157672
file name : Image_04052023144805358.png
|
2023-05-04 14:48:05.455977 |
343 |
66949508 |
Creation of a new source of drinking water |
76000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.44897246453911
Longitude : 86.21193305589259
file name : Image_29042023111113073.png
|
2023-04-29 11:11:13.172865 |
344 |
66949378 |
Creation of a new source of drinking water |
76000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.442867253907025
Longitude : 86.19613274931908
file name : Image_23052023134445826.png
|
2023-05-23 13:44:45.925776 |
345 |
66949378 |
Creation of a new source of drinking water |
76000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.44285191502422
Longitude : 86.19619444012642
file name : Image_17052023160707699.png
|
2023-05-17 16:07:07.799732 |
346 |
66949378 |
Creation of a new source of drinking water |
76000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.442878653295338
Longitude : 86.19614314287901
file name : Image_29042023161935717.png
|
2023-04-29 16:19:35.979513 |
347 |
66508659 |
Creation of drainage channel for management of grey water |
110000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.44497153069824
Longitude : 86.21938305906951
file name : Image_24032023082606125.png
|
2023-03-24 08:26:06.201394 |
348 |
66508659 |
Creation of drainage channel for management of grey water |
110000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.444907325319946
Longitude : 86.21939680539072
file name : Image_24022023100745201.png
|
2023-02-24 10:07:45.286012 |
349 |
66508659 |
Creation of drainage channel for management of grey water |
110000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.4449148690328
Longitude : 86.21941541321576
file name : Image_17022023101502179.png
|
2023-02-17 10:15:02.248497 |
350 |
57958241 |
Deep tube well with solar pump and water tank at Ratnadih |
350000 |
Deep tube well with solar pump and water tank at Ratnadih1 |
Roof laid |
-
latitude : 23.44972176477313
Longitude : 86.20497708208859
file name : Image_02062023182753771.png
|
2023-06-02 18:27:53.876361 |
351 |
57958241 |
Deep tube well with solar pump and water tank at Ratnadih |
350000 |
Deep tube well with solar pump and water tank at Ratnadih1 |
Plinth level |
-
latitude : 23.449768451973796
Longitude : 86.2050262838602
file name : Image_22052023154404292.png
|
2023-05-22 15:44:04.400381 |
352 |
57958241 |
Deep tube well with solar pump and water tank at Ratnadih |
350000 |
Deep tube well with solar pump and water tank at Ratnadih1 |
Completion of work |
-
latitude : 23.44973672647029
Longitude : 86.20498118922114
file name : Image_29042023161939501.png
|
2023-04-29 16:19:39.599345 |
353 |
34910415 |
Construction of Bandhaghat at Kuiri Bandh at Selani |
150000 |
Construction of Bandhaghat at Kuiri Bandh at Selani1 |
Plinth level |
-
latitude : 23.447444359771907
Longitude : 86.1983609944582
file name : Image_09042022162944228.png
|
2022-04-09 16:29:44.343892 |
354 |
34910415 |
Construction of Bandhaghat at Kuiri Bandh at Selani |
150000 |
Construction of Bandhaghat at Kuiri Bandh at Selani1 |
Roof laid |
-
latitude : 23.447453579865396
Longitude : 86.19840206578374
file name : Image_24042022100328386.png
|
2022-04-24 10:03:28.453235 |
355 |
34910415 |
Construction of Bandhaghat at Kuiri Bandh at Selani |
150000 |
Construction of Bandhaghat at Kuiri Bandh at Selani1 |
Completion of work |
-
latitude : 23.44743715133518
Longitude : 86.19834892451763
file name : Image_19032022115153645.png
|
2022-03-19 11:51:53.764486 |
356 |
34897068 |
Construction of Bandhaghat at Sahar Garia at Bhelaidh |
180000 |
Construction of Bandhaghat at Sahar Garia at Bhelaidh1 |
Plinth level |
-
latitude : 23.42132341582328
Longitude : 86.16923220455647
file name : Image_20082022172211273.png
|
2022-08-20 17:22:11.358437 |
357 |
34897068 |
Construction of Bandhaghat at Sahar Garia at Bhelaidh |
180000 |
Construction of Bandhaghat at Sahar Garia at Bhelaidh1 |
Completion of work |
-
latitude : 23.42127446550876
Longitude : 86.16917395032942
file name : Image_20032022113947225.png
|
2022-03-20 11:39:47.331875 |
358 |
34909391 |
Construction of Bandhaghat at Sarkari Bandh at Chaitandih |
150000 |
Construction of Bandhaghat at Sarkari Bandh at Chaitandih1 |
Plinth level |
-
latitude : 23.435477977618575
Longitude : 86.19391866959631
file name : Image_09042022164925628.png
|
2022-04-09 16:49:25.733093 |
359 |
34909391 |
Construction of Bandhaghat at Sarkari Bandh at Chaitandih |
150000 |
Construction of Bandhaghat at Sarkari Bandh at Chaitandih1 |
Roof laid |
-
latitude : 23.435395122505724
Longitude : 86.19392889551818
file name : Image_06052022095351417.png
|
2022-05-06 09:53:51.546924 |
360 |
34909391 |
Construction of Bandhaghat at Sarkari Bandh at Chaitandih |
150000 |
Construction of Bandhaghat at Sarkari Bandh at Chaitandih1 |
Completion of work |
-
latitude : 23.43545639421791
Longitude : 86.19389972649515
file name : Image_12032022125940376.png
|
2022-03-12 12:59:40.524797 |
361 |
58112205 |
Construction of Soak pit near Shiv Mandir in Hargara |
75000 |
Construction of Soak pit near Shiv Mandir in Hargara1 |
Roof laid |
-
latitude : 23.44185677357018
Longitude : 86.16794264875352
file name : Image_27032023174705075.png
|
2023-03-27 17:47:05.139878 |
362 |
58112205 |
Construction of Soak pit near Shiv Mandir in Hargara |
75000 |
Construction of Soak pit near Shiv Mandir in Hargara1 |
Roof laid |
-
latitude : 23.441870561800897
Longitude : 86.16793368011713
file name : Image_27032023175056147.png
|
2023-03-27 17:50:56.218056 |
363 |
58112205 |
Construction of Soak pit near Shiv Mandir in Hargara |
75000 |
Construction of Soak pit near Shiv Mandir in Hargara1 |
Plinth level |
-
latitude : 23.44182521570474
Longitude : 86.16792772896588
file name : Image_08032023100800387.png
|
2023-03-08 10:08:00.454565 |
364 |
58112205 |
Construction of Soak pit near Shiv Mandir in Hargara |
75000 |
Construction of Soak pit near Shiv Mandir in Hargara1 |
Completion of work |
-
latitude : 23.441769015043974
Longitude : 86.16792974062264
file name : Image_02032023180451253.png
|
2023-03-02 18:04:51.32326 |
365 |
34898372 |
Construction of Bandhaghat at Durma Bandh at Durma |
100000 |
Construction of Bandhaghat at Durma Bandh at Durma1 |
Roof laid |
-
latitude : 23.43182652723044
Longitude : 86.17849580012262
file name : Image_09072022123837776.png
|
2022-07-09 12:38:37.85629 |
366 |
34898372 |
Construction of Bandhaghat at Durma Bandh at Durma |
100000 |
Construction of Bandhaghat at Durma Bandh at Durma1 |
Plinth level |
-
latitude : 23.43181470874697
Longitude : 86.17848431691527
file name : Image_01072022142612913.png
|
2022-07-01 14:26:13.031944 |
367 |
34898372 |
Construction of Bandhaghat at Durma Bandh at Durma |
100000 |
Construction of Bandhaghat at Durma Bandh at Durma1 |
Completion of work |
-
latitude : 23.431820324622095
Longitude : 86.17846026085317
file name : Image_09042022173347873.png
|
2022-04-09 17:33:47.984365 |
368 |
34937037 |
Construction of Bandhaghat at Dalahi Bandh in Gunja in Plot No. 2571 |
100000 |
Construction of Bandhaghat at Dalahi Bandh in Gunja in Plot No. 25711 |
Roof laid |
-
latitude : 23.42331826686859
Longitude : 86.22690355405211
file name : Image_09072022175110113.png
|
2022-07-09 17:51:10.197824 |
369 |
34937037 |
Construction of Bandhaghat at Dalahi Bandh in Gunja in Plot No. 2571 |
100000 |
Construction of Bandhaghat at Dalahi Bandh in Gunja in Plot No. 25711 |
Completion of work |
-
latitude : 23.423301419243217
Longitude : 86.22685376554728
file name : Image_20032022102620740.png
|
2022-03-20 10:26:20.843224 |
370 |
34937037 |
Construction of Bandhaghat at Dalahi Bandh in Gunja in Plot No. 2571 |
100000 |
Construction of Bandhaghat at Dalahi Bandh in Gunja in Plot No. 25711 |
Plinth level |
-
latitude : 23.423268226906657
Longitude : 86.22692710720003
file name : Image_25062022165633138.png
|
2022-06-25 16:56:33.231103 |
371 |
47148756 |
Construction of Drain cum culvert near Sayer Bandh at Baragram |
75000 |
Construction of Drain cum culvert near Sayer Bandh at Baragram1 |
Plinth level |
-
latitude : 23.44636590220034,23.446201868355274
Longitude : 86.22102985158563,86.22100529260933
file name : Image_25092022163258069.png
|
2022-09-25 16:32:58.167258 |
372 |
47148756 |
Construction of Drain cum culvert near Sayer Bandh at Baragram |
75000 |
Construction of Drain cum culvert near Sayer Bandh at Baragram1 |
Roof laid |
-
latitude : 23.44639079645276,23.446210543625057
Longitude : 86.22100420296192,86.2209866847843
file name : Image_27092022163600514.png
|
2022-09-27 16:36:00.587309 |
373 |
47148756 |
Construction of Drain cum culvert near Sayer Bandh at Baragram |
75000 |
Construction of Drain cum culvert near Sayer Bandh at Baragram1 |
Completion of work |
-
latitude : 23.44629784114659,23.44612513203174
Longitude : 86.22106958180666,86.22093848884106
file name : Image_17092022144842608.png
|
2022-09-17 14:48:42.707131 |
374 |
47149477 |
Construction of Drain in Hargara Sansad |
72000 |
Construction of Drain in Hargara Sansad1 |
Roof laid |
-
latitude : 23.44524339772761,23.445220557041466
Longitude : 86.16494343616068,86.16486925631762
file name : Image_26102022111054473.png
|
2022-10-26 11:10:56.993592 |
375 |
47149477 |
Construction of Drain in Hargara Sansad |
72000 |
Construction of Drain in Hargara Sansad1 |
Plinth level |
-
latitude : 23.445257730782032,23.44523983541876
Longitude : 86.16492583416402,86.16481234319508
file name : Image_29092022102207459.png
|
2022-09-29 10:22:07.538456 |
376 |
47149477 |
Construction of Drain in Hargara Sansad |
72000 |
Construction of Drain in Hargara Sansad1 |
Completion of work |
-
latitude : 23.445114945061505,23.44529176130891
Longitude : 86.16493790410459,86.16495533846319
file name : Image_12092022144255985.png
|
2022-09-12 14:42:56.08083 |
377 |
47149755 |
Construction of Bathing Ghat with dustbin at Bhadua Garia in Selani |
150000 |
Construction of Bathing Ghat with dustbin at Bhadua Garia in Selani1 |
Roof laid |
-
latitude : 23.450260888785124
Longitude : 86.19136453606188
file name : Image_08042023085350449.png
|
2023-04-08 08:53:50.519583 |
378 |
47149755 |
Construction of Bathing Ghat with dustbin at Bhadua Garia in Selani |
150000 |
Construction of Bathing Ghat with dustbin at Bhadua Garia in Selani1 |
Plinth level |
-
latitude : 23.4502819692716
Longitude : 86.19133201427758
file name : Image_01042023122727558.png
|
2023-04-01 12:27:27.636617 |
379 |
47149755 |
Construction of Bathing Ghat with dustbin at Bhadua Garia in Selani |
150000 |
Construction of Bathing Ghat with dustbin at Bhadua Garia in Selani1 |
Completion of work |
-
latitude : 23.45028004143387
Longitude : 86.19126856327057
file name : Image_13032023165459332.png
|
2023-03-13 16:54:59.408368 |
380 |
66508735 |
Construction of toilets in public institutions |
125000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.422727258875966
Longitude : 86.22993336059153
file name : Image_27032023080055726.png
|
2023-03-27 08:00:55.798647 |
381 |
66508735 |
Construction of toilets in public institutions |
125000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.444963903166354
Longitude : 86.21928532607853
file name : Image_22032023144618386.png
|
2023-03-22 14:46:18.455433 |
382 |
66508735 |
Construction of toilets in public institutions |
125000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.444948690012097
Longitude : 86.21934081427753
file name : Image_08032023081229095.png
|
2023-03-08 08:12:29.164652 |
383 |
47148851 |
Construction of drain near Ratnadih Jore |
200000 |
Construction of drain near Ratnadih Jore1 |
Plinth level |
-
latitude : 23.44880268909037,23.448836049064994
Longitude : 86.20279191993177,86.20315167121589
file name : Image_24112022170356003.png
|
2022-11-24 17:03:56.078867 |
384 |
47148851 |
Construction of drain near Ratnadih Jore |
200000 |
Construction of drain near Ratnadih Jore1 |
Roof laid |
-
latitude : 23.448831816203892,23.44889497384429
Longitude : 86.20280122384429,86.20321034453809
file name : Image_26112022152906364.png
|
2022-11-26 15:29:06.430827 |
385 |
47148851 |
Construction of drain near Ratnadih Jore |
200000 |
Construction of drain near Ratnadih Jore1 |
Completion of work |
-
latitude : 23.44878894276917,23.448855997994542
Longitude : 86.20273073203862,86.20315795764327
file name : Image_08112022162916640.png
|
2022-11-08 16:29:16.720162 |
386 |
47149652 |
Construction of soak pit of tube well near Kali Mandir in Kokiara |
24000 |
Construction of soak pit of tube well near Kali Mandir in Kokiara1 |
Plinth level |
-
latitude : 23.451924570836127
Longitude : 86.23487533070147
file name : Image_06112022154508688.png
|
2022-11-06 15:45:08.781966 |
387 |
47149652 |
Construction of soak pit of tube well near Kali Mandir in Kokiara |
24000 |
Construction of soak pit of tube well near Kali Mandir in Kokiara1 |
Roof laid |
-
latitude : 23.45194770488888
Longitude : 86.23483400791883
file name : Image_08112022151607341.png
|
2022-11-08 15:16:07.405073 |
388 |
47149652 |
Construction of soak pit of tube well near Kali Mandir in Kokiara |
24000 |
Construction of soak pit of tube well near Kali Mandir in Kokiara1 |
Completion of work |
-
latitude : 23.45192867796868
Longitude : 86.2348151486367
file name : Image_28092022094745227.png
|
2022-09-28 09:47:45.318626 |
389 |
47148569 |
Construction of Bathing Ghat with dustbin at Sayer Bandh in Agharpur |
150000 |
Construction of Bathing Ghat with dustbin at Sayer Bandh in Agharpur1 |
Roof laid |
-
latitude : 23.425690387375653
Longitude : 86.20102878659964
file name : Image_19042023082835085.png
|
2023-04-19 08:28:35.217022 |
390 |
47148569 |
Construction of Bathing Ghat with dustbin at Sayer Bandh in Agharpur |
150000 |
Construction of Bathing Ghat with dustbin at Sayer Bandh in Agharpur1 |
Plinth level |
-
latitude : 23.425765028223395
Longitude : 86.20098629035056
file name : Image_10042023180948673.png
|
2023-04-10 18:09:48.774234 |
391 |
47148569 |
Construction of Bathing Ghat with dustbin at Sayer Bandh in Agharpur |
150000 |
Construction of Bathing Ghat with dustbin at Sayer Bandh in Agharpur1 |
Completion of work |
-
latitude : 23.4257396729663
Longitude : 86.20103046298027
file name : Image_24032023103956454.png
|
2023-03-24 10:39:56.540617 |
392 |
47148939 |
Construction of Bathing Ghat with dustbin at Mahato Bandh in Kokiara |
100000 |
Construction of Bathing Ghat with dustbin at Mahato Bandh in Kokiara1 |
Plinth level |
-
latitude : 23.451191363856196
Longitude : 86.23522125184536
file name : Image_14012023154358112.png
|
2023-01-14 15:43:58.193848 |
393 |
47148939 |
Construction of Bathing Ghat with dustbin at Mahato Bandh in Kokiara |
100000 |
Construction of Bathing Ghat with dustbin at Mahato Bandh in Kokiara1 |
Roof laid |
-
latitude : 23.460085904225707
Longitude : 86.2432352732867
file name : Image_04022023151839561.png
|
2023-02-04 15:18:39.649794 |
394 |
47148939 |
Construction of Bathing Ghat with dustbin at Mahato Bandh in Kokiara |
100000 |
Construction of Bathing Ghat with dustbin at Mahato Bandh in Kokiara1 |
Completion of work |
-
latitude : 23.451034957543015
Longitude : 86.23514455743134
file name : Image_05012023161957854.png
|
2023-01-05 16:19:57.928417 |
395 |
47148806 |
Construction of Drain from Bura Bandh to Nutan Bandh in Kusumtikri |
300000 |
Construction of Drain from Bura Bandh to Nutan Bandh in Kusumtikri1 |
Plinth level |
-
latitude : 23.426817962899804,23.42652732040733
Longitude : 86.18622592650354,86.18625534698367
file name : Image_30072022164626236.png
|
2022-07-30 16:46:26.322922 |
396 |
47148806 |
Construction of Drain from Bura Bandh to Nutan Bandh in Kusumtikri |
300000 |
Construction of Drain from Bura Bandh to Nutan Bandh in Kusumtikri1 |
Completion of work |
-
latitude : 23.4268258837983,23.426545257680118
Longitude : 86.1861706059426,86.1862155329436
file name : Image_09072022121749193.png
|
2022-07-09 12:17:49.269708 |
397 |
57908254 |
PCC Road from Gour Rajwar house to Deben Gorain house in Baragram |
100000 |
PCC Road from Gour Rajwar house to Deben Gorain house in Baragram1 |
Roof laid |
-
latitude : 23.443628330715,23.443766715936363
Longitude : 86.21958900243044,86.21956871822476
file name : Image_26052023182621714.png
|
2023-05-26 18:26:21.817717 |
398 |
57908254 |
PCC Road from Gour Rajwar house to Deben Gorain house in Baragram |
100000 |
PCC Road from Gour Rajwar house to Deben Gorain house in Baragram1 |
Plinth level |
-
latitude : 23.443626780062914,23.443762524984777
Longitude : 86.2195907626301,86.21951725333929
file name : Image_25052023132813727.png
|
2023-05-25 13:28:13.839543 |
399 |
57908254 |
PCC Road from Gour Rajwar house to Deben Gorain house in Baragram |
100000 |
PCC Road from Gour Rajwar house to Deben Gorain house in Baragram1 |
Completion of work |
-
latitude : 23.443662403151393,23.44378607813269
Longitude : 86.21953971683979,86.21951457113028
file name : Image_24052023182634618.png
|
2023-05-24 18:26:34.711245 |
400 |
66949627 |
Renovation of Floor of Chaitandih Crematorium |
50000 |
Renovation of Floor of Chaitandih Crematorium1 |
Roof laid |
-
latitude : 23.444382618181407
Longitude : 86.18713201023638
file name : Image_27092023134948712.png
|
2023-09-27 13:49:48.799944 |
401 |
66949627 |
Renovation of Floor of Chaitandih Crematorium |
50000 |
Renovation of Floor of Chaitandih Crematorium1 |
Roof laid |
-
latitude : 23.44441467896104
Longitude : 86.18711809627712
file name : Image_30052023132454139.png
|
2023-05-30 13:24:54.248658 |
402 |
66949627 |
Renovation of Floor of Chaitandih Crematorium |
50000 |
Renovation of Floor of Chaitandih Crematorium1 |
Plinth level |
-
latitude : 23.444468867965043
Longitude : 86.18714709766209
file name : Image_23052023135809603.png
|
2023-05-23 13:58:09.715877 |
403 |
66949627 |
Renovation of Floor of Chaitandih Crematorium |
50000 |
Renovation of Floor of Chaitandih Crematorium1 |
Completion of work |
-
latitude : 23.4444658504799
Longitude : 86.18714709766209
file name : Image_05052023143954488.png
|
2023-05-05 14:39:54.59656 |
404 |
57959879 |
Tube well with soak pit and solid platform near Transforma at Selani |
76000 |
Tube well with soak pit and solid platform near Transforma at Selani1 |
Roof laid |
-
latitude : 23.44034279230982
Longitude : 86.19579889811575
file name : Image_27092023162922408.png
|
2023-09-27 16:29:22.506326 |
405 |
57959879 |
Tube well with soak pit and solid platform near Transforma at Selani |
76000 |
Tube well with soak pit and solid platform near Transforma at Selani1 |
Roof laid |
-
latitude : 23.440415463410318
Longitude : 86.19581767357886
file name : Image_31082023114100866.png
|
2023-08-31 11:41:00.968476 |
406 |
57959879 |
Tube well with soak pit and solid platform near Transforma at Selani |
76000 |
Tube well with soak pit and solid platform near Transforma at Selani1 |
Plinth level |
-
latitude : 23.44044710509479
Longitude : 86.19579780846834
file name : Image_05062023174558224.png
|
2023-06-05 17:45:58.318008 |
407 |
57959879 |
Tube well with soak pit and solid platform near Transforma at Selani |
76000 |
Tube well with soak pit and solid platform near Transforma at Selani1 |
Completion of work |
-
latitude : 23.44037669710815
Longitude : 86.19582328945398
file name : Image_02062023184642853.png
|
2023-06-02 18:46:42.931381 |
408 |
57956013 |
Tube well with soak pit and solid platform near Dasharath Mahato house in Bangora |
76000 |
Tube well with soak pit and solid platform near Dasharath Mahato house in Bangora1 |
Roof laid |
-
latitude : 23.451850307174027
Longitude : 86.19297604076564
file name : Image_04082023182300578.png
|
2023-08-04 18:23:00.700189 |
409 |
57956013 |
Tube well with soak pit and solid platform near Dasharath Mahato house in Bangora |
76000 |
Tube well with soak pit and solid platform near Dasharath Mahato house in Bangora1 |
Roof laid |
-
latitude : 23.45182599965483
Longitude : 86.19299808517098
file name : Image_04082023182351159.png
|
2023-08-04 18:23:51.2557 |
410 |
57956013 |
Tube well with soak pit and solid platform near Dasharath Mahato house in Bangora |
76000 |
Tube well with soak pit and solid platform near Dasharath Mahato house in Bangora1 |
Plinth level |
-
latitude : 23.451831908896565
Longitude : 86.19295843876898
file name : Image_03082023164424952.png
|
2023-08-03 16:44:25.044506 |
411 |
57956013 |
Tube well with soak pit and solid platform near Dasharath Mahato house in Bangora |
76000 |
Tube well with soak pit and solid platform near Dasharath Mahato house in Bangora1 |
Completion of work |
-
latitude : 23.451831028796732
Longitude : 86.19292952120304
file name : Image_30072023171316486.png
|
2023-07-30 17:13:16.582731 |
412 |
57955123 |
Tube well with soak pit and solid platform near Sukumar Chatterjee house in Baragram |
76000 |
Tube well with soak pit and solid platform near Sukumar Chatterjee house in Baragram1 |
Roof laid |
-
latitude : 23.44488645438105
Longitude : 86.22096036560833
file name : Image_04082023183716904.png
|
2023-08-04 18:37:17.038409 |
413 |
57955123 |
Tube well with soak pit and solid platform near Sukumar Chatterjee house in Baragram |
76000 |
Tube well with soak pit and solid platform near Sukumar Chatterjee house in Baragram1 |
Plinth level |
-
latitude : 23.444927777163684
Longitude : 86.22096656821668
file name : Image_03082023145943756.png
|
2023-08-03 14:59:43.864103 |
414 |
57955123 |
Tube well with soak pit and solid platform near Sukumar Chatterjee house in Baragram |
76000 |
Tube well with soak pit and solid platform near Sukumar Chatterjee house in Baragram1 |
Completion of work |
-
latitude : 23.4437763
Longitude : 86.2210904
file name : Image_30072023174109723.png
|
2023-07-30 17:41:09.834616 |
415 |
57958000 |
Tube well with saok pit and solid platform near Panchanan Mahato house in Hargara |
76000 |
Tube well with saok pit and solid platform near Panchanan Mahato house in Hargara1 |
Roof laid |
-
latitude : 23.43804208561778
Longitude : 86.16900882683694
file name : Image_31082023091441805.png
|
2023-08-31 09:14:41.883594 |
416 |
57958000 |
Tube well with saok pit and solid platform near Panchanan Mahato house in Hargara |
76000 |
Tube well with saok pit and solid platform near Panchanan Mahato house in Hargara1 |
Plinth level |
-
latitude : 23.43805231153965
Longitude : 86.16898158565164
file name : Image_09082023162732798.png
|
2023-08-09 16:27:32.91539 |
417 |
57958000 |
Tube well with saok pit and solid platform near Panchanan Mahato house in Hargara |
76000 |
Tube well with saok pit and solid platform near Panchanan Mahato house in Hargara1 |
Completion of work |
-
latitude : 23.438043049536645
Longitude : 86.16900748573244
file name : Image_09082023161310416.png
|
2023-08-09 16:13:10.530953 |
418 |
57954158 |
Tube well with soak pit and Solid platform at Silfore Primary School |
76000 |
Tube well with soak pit and Solid platform at Silfore Primary School1 |
Roof laid |
-
latitude : 23.439790508709848
Longitude : 86.1767937708646
file name : Image_31082023093910991.png
|
2023-08-31 09:39:11.089159 |
419 |
57954158 |
Tube well with soak pit and Solid platform at Silfore Primary School |
76000 |
Tube well with soak pit and Solid platform at Silfore Primary School1 |
Plinth level |
-
latitude : 23.43978887423873
Longitude : 86.17682092823088
file name : Image_09082023154359234.png
|
2023-08-09 15:43:59.336414 |
420 |
57954158 |
Tube well with soak pit and Solid platform at Silfore Primary School |
76000 |
Tube well with soak pit and Solid platform at Silfore Primary School1 |
Completion of work |
-
latitude : 23.439764440990984
Longitude : 86.17684255354106
file name : Image_08082023175447067.png
|
2023-08-08 17:54:47.166539 |
421 |
57953976 |
Tube well with soak pit and solid platform in Kokiara |
76000 |
Tube well with soak pit and solid platform in Kokiara1 |
Roof laid |
-
latitude : 23.451821012422442
Longitude : 86.24289899133146
file name : Image_31082023104314693.png
|
2023-08-31 10:43:14.77127 |
422 |
57953976 |
Tube well with soak pit and solid platform in Kokiara |
76000 |
Tube well with soak pit and solid platform in Kokiara1 |
Plinth level |
-
latitude : 23.45186128746718
Longitude : 86.24300410039723
file name : Image_09082023145529578.png
|
2023-08-09 14:55:29.699063 |
423 |
57953976 |
Tube well with soak pit and solid platform in Kokiara |
76000 |
Tube well with soak pit and solid platform in Kokiara1 |
Completion of work |
-
latitude : 23.451788742095232
Longitude : 86.24297149479389
file name : Image_08082023183136006.png
|
2023-08-08 18:31:36.163702 |
424 |
57907541 |
PCC road from Shiv Mandir to Kalindi Para in Silforee |
300000 |
PCC road from Shiv Mandir to Kalindi Para in Silforee1 |
Roof laid |
-
latitude : 23.441821611486375,23.441787539049983
Longitude : 86.18052220903337,86.18069822899997
file name : Image_07092023163928810.png
|
2023-09-07 16:39:31.991326 |
425 |
57907541 |
PCC road from Shiv Mandir to Kalindi Para in Silforee |
300000 |
PCC road from Shiv Mandir to Kalindi Para in Silforee1 |
Plinth level |
-
latitude : 23.441716879606247,23.441775469109416
Longitude : 86.18079956620932,86.18055674247444
file name : Image_02092023123604566.png
|
2023-09-02 12:36:04.655205 |
426 |
57907541 |
PCC road from Shiv Mandir to Kalindi Para in Silforee |
300000 |
PCC road from Shiv Mandir to Kalindi Para in Silforee1 |
Completion of work |
-
latitude : 23.441721322014928,23.441763650625944
Longitude : 86.18076888844371,86.18052824400365
file name : Image_02092023122341523.png
|
2023-09-02 12:23:41.607876 |
427 |
57910516 |
PCC Road from Meghnath Mahato house to Rudranarayan Mahato house in Hargara |
100000 |
PCC Road from Meghnath Mahato house to Rudranarayan Mahato house in Hargara1 |
Roof laid |
-
latitude : 23.44347020611167,23.443517102859914
Longitude : 86.1693792231381,86.16971307434142
file name : Image_15092023145639648.png
|
2023-09-15 14:56:39.733206 |
428 |
57910516 |
PCC Road from Meghnath Mahato house to Rudranarayan Mahato house in Hargara |
100000 |
PCC Road from Meghnath Mahato house to Rudranarayan Mahato house in Hargara1 |
Plinth level |
-
latitude : 23.443473810330033,23.4435350401327,23.443653308786452
Longitude : 86.16926740854979,86.1692772153765,86.16931300610304
file name : Image_13092023140208724.png
|
2023-09-13 14:02:08.807883 |
429 |
57910516 |
PCC Road from Meghnath Mahato house to Rudranarayan Mahato house in Hargara |
100000 |
PCC Road from Meghnath Mahato house to Rudranarayan Mahato house in Hargara1 |
Completion of work |
-
latitude : 23.44347951002419,23.443430517800152
Longitude : 86.16969413124025,86.16930252872407
file name : Image_09092023093950009.png
|
2023-09-09 09:39:50.119568 |
430 |
58111265 |
Construction of drain and soak pit at Bartard Primary School |
225000 |
Construction of drain and soak pit at Bartard Primary School1 |
Roof laid |
-
latitude : 23.425581716001034,23.425518893636763
Longitude : 86.2233798019588,86.22324652969837
file name : Image_12102023131436222.png
|
2023-10-12 13:14:36.310796 |
431 |
58111265 |
Construction of drain and soak pit at Bartard Primary School |
225000 |
Construction of drain and soak pit at Bartard Primary School1 |
Plinth level |
-
latitude : 23.42562454752624,23.425586996600032
Longitude : 86.22330243699253,86.22317402623594
file name : Image_14092023154200925.png
|
2023-09-14 15:42:01.020138 |
432 |
58111265 |
Construction of drain and soak pit at Bartard Primary School |
225000 |
Construction of drain and soak pit at Bartard Primary School1 |
Completion of work |
-
latitude : 23.425628235563636,23.425562395714223
Longitude : 86.223264047876,86.22316103428602
file name : Image_14092023153252402.png
|
2023-09-14 15:32:52.510266 |
433 |
67764783 |
Construction of roads |
198000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.432422312907875,23.43235425185412
Longitude : 86.18062497116625,86.18096376769245
file name : Image_12112023114758032.png
|
2023-11-12 11:47:58.11313 |
434 |
67764783 |
Construction of roads |
198000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.4384356578812,23.432454667054117
Longitude : 86.21593549847603,86.18099251762033
file name : Image_09112023112717298.png
|
2023-11-09 11:27:17.427429 |
435 |
67764783 |
Construction of roads |
198000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.438656898215413,23.438656898215413
Longitude : 86.2163997720927,86.2163997720927
file name : Image_01112023172243221.png
|
2023-11-01 17:22:43.310812 |
436 |
67764128 |
Construction of roads |
249000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.437811750918627,23.437608992680907
Longitude : 86.17439595982432,86.17495017126203
file name : Image_09112023115611492.png
|
2023-11-09 11:56:11.607859 |
437 |
67764128 |
Construction of roads |
249000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.43759449198842,23.43771276064217
Longitude : 86.1750103533268,86.17467356845737
file name : Image_07112023145513542.png
|
2023-11-07 14:55:13.635703 |
438 |
67764128 |
Construction of roads |
249000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.437712383456528,23.437715065665543,23.43759248033166
Longitude : 86.17459796369076,86.17458237335086,86.174973892048
file name : Image_04112023131249784.png
|
2023-11-04 13:12:49.875936 |
439 |
66521950 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.42681942973286
Longitude : 86.17525116540492
file name : Image_16012024163758220.png
|
2024-01-16 16:37:58.310334 |
440 |
66521950 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.42677043750882
Longitude : 86.17521428503096
file name : Image_06012024132405352.png
|
2024-01-06 13:24:05.447152 |
441 |
66521950 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.426853795535862
Longitude : 86.17531872354448
file name : Image_02112023155601739.png
|
2023-11-02 15:56:01.838366 |
442 |
66522339 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.425551960244775
Longitude : 86.22328944504261
file name : Image_15102023101956770.png
|
2023-10-15 10:19:56.860986 |
443 |
66522339 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.42555950395763
Longitude : 86.22328533791006
file name : Image_14102023092311376.png
|
2023-10-14 09:23:11.468817 |
444 |
66522339 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.42560187447816
Longitude : 86.22328885830939
file name : Image_12102023130127203.png
|
2023-10-12 13:01:27.309477 |
445 |
66949356 |
Creation of drainage channel for management of grey water |
90000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.42366167344153
Longitude : 86.1965046543628
file name : Image_08102023141502025.png
|
2023-10-08 14:15:02.120601 |
446 |
66949356 |
Creation of drainage channel for management of grey water |
90000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.42383396346122
Longitude : 86.1965215858072
file name : Image_06102023122414852.png
|
2023-10-06 12:24:14.952702 |
447 |
66949356 |
Creation of drainage channel for management of grey water |
90000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.423849595710635
Longitude : 86.19659157469869
file name : Image_29092023113657246.png
|
2023-09-29 11:36:57.406839 |
448 |
66949356 |
Creation of drainage channel for management of grey water |
90000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.423805716447532
Longitude : 86.19658646173775
file name : Image_27092023174002104.png
|
2023-09-27 17:40:02.197614 |
449 |
47125790 |
Construction of Gate of GP Office |
200000 |
Construction of Gate of GP Office1 |
Roof laid |
-
latitude : 23.448833492584527
Longitude : 86.21962613426149
file name : Image_31012024115418142.png
|
2024-01-31 11:54:18.239127 |
450 |
47125790 |
Construction of Gate of GP Office |
200000 |
Construction of Gate of GP Office1 |
Plinth level |
-
latitude : 23.438781914301217
Longitude : 86.21670696884394
file name : Image_22112023135817359.png
|
2023-11-22 13:58:17.452257 |
451 |
47125790 |
Construction of Gate of GP Office |
200000 |
Construction of Gate of GP Office1 |
Completion of work |
-
latitude : 23.43871741555631
Longitude : 86.21671962551773
file name : Image_17112023115304977.png
|
2023-11-17 11:53:05.059778 |
452 |
57912745 |
PCC Road from Fatu Garia to Alit Mahato house in Ratnadih |
250000 |
PCC Road from Fatu Garia to Alit Mahato house in Ratnadih1 |
Roof laid |
-
latitude : 23.449700055643916,23.449981310404837
Longitude : 86.20432731695473,86.2046694662422
file name : Image_12102023152414748.png
|
2023-10-12 15:24:14.837475 |
453 |
57912745 |
PCC Road from Fatu Garia to Alit Mahato house in Ratnadih |
250000 |
PCC Road from Fatu Garia to Alit Mahato house in Ratnadih1 |
Plinth level |
-
latitude : 23.449915596283972,23.449638825841248
Longitude : 86.20475026778877,86.2043425720185
file name : Image_08102023144601117.png
|
2023-10-08 14:46:01.209819 |
454 |
57912745 |
PCC Road from Fatu Garia to Alit Mahato house in Ratnadih |
250000 |
PCC Road from Fatu Garia to Alit Mahato house in Ratnadih1 |
Completion of work |
-
latitude : 23.449885044246912,23.449647584930062
Longitude : 86.20461674407125,86.20434332638979
file name : Image_30092023164940069.png
|
2023-09-30 16:49:40.164491 |
455 |
66949270 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.42275697272271
Longitude : 86.203125519678
file name : Image_01112023105824433.png
|
2023-11-01 10:58:24.524751 |
456 |
66949270 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.422682248055935
Longitude : 86.20319441892207
file name : Image_31102023154213061.png
|
2023-10-31 15:42:13.158846 |
457 |
66949270 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.422698844224215
Longitude : 86.203154604882
file name : Image_27102023095627740.png
|
2023-10-27 09:56:27.844476 |
458 |
67764576 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.443360067903996,23.44359270762652
Longitude : 86.21952638961375,86.21959637850523
file name : Image_17102023151230478.png
|
2023-10-17 15:12:30.59211 |
459 |
67764576 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.443381022661924,23.443523640744388
Longitude : 86.21946486644447,86.21950174681842
file name : Image_15102023123043225.png
|
2023-10-15 12:30:43.343733 |
460 |
67764576 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.443675562739372,23.443384962156415
Longitude : 86.2194750085473,86.21948615647852
file name : Image_15102023122843971.png
|
2023-10-15 12:28:44.063852 |
461 |
67764576 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.443609680980444,23.44332762993872
Longitude : 86.21948163025081,86.21945573017001
file name : Image_15102023114258446.png
|
2023-10-15 11:42:58.53024 |
462 |
67764895 |
Construction of roads |
198000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.443296030163765,23.443577829748392
Longitude : 86.22047019191086,86.22049072757363
file name : Image_18102023130007241.png
|
2023-10-18 13:00:07.332129 |
463 |
67764895 |
Construction of roads |
198000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.4432276757434,23.44348860438913
Longitude : 86.2204700242728,86.22045292519033
file name : Image_17102023152539038.png
|
2023-10-17 15:25:39.124497 |
464 |
67764895 |
Construction of roads |
198000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.443232369609177,23.443499919958413
Longitude : 86.22046943753958,86.2204665876925
file name : Image_17102023145651099.png
|
2023-10-17 14:56:51.194719 |
465 |
67764895 |
Construction of roads |
198000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.443270255811512,23.443409772589803
Longitude : 86.22047890909016,86.22049123048782
file name : Image_17102023145107746.png
|
2023-10-17 14:51:07.840799 |
466 |
57957151 |
Deep tube well with solar pump and water tank near Dukhu Garia in Kusumtikri |
350000 |
Deep tube well with solar pump and water tank near Dukhu Garia in Kusumtikri1 |
Roof laid |
-
latitude : 23.42963805422187
Longitude : 86.18223337456584
file name : Image_06012024134616342.png
|
2024-01-06 13:46:16.49963 |
467 |
57957151 |
Deep tube well with solar pump and water tank near Dukhu Garia in Kusumtikri |
350000 |
Deep tube well with solar pump and water tank near Dukhu Garia in Kusumtikri1 |
Plinth level |
-
latitude : 23.429651926271617
Longitude : 86.18228249251842
file name : Image_07112023143015125.png
|
2023-11-07 14:30:15.270003 |
468 |
57957151 |
Deep tube well with solar pump and water tank near Dukhu Garia in Kusumtikri |
350000 |
Deep tube well with solar pump and water tank near Dukhu Garia in Kusumtikri1 |
Completion of work |
-
latitude : 23.42960779555142
Longitude : 86.18231761269271
file name : Image_07112023090032816.png
|
2023-11-07 09:00:32.912973 |
469 |
57909949 |
PCC from Kalindi Para to Chinibas Mahato house in Kusumtikri |
250000 |
PCC from Kalindi Para to Chinibas Mahato house in Kusumtikri1 |
Roof laid |
-
latitude : 23.428237815387547,23.427908741869032
Longitude : 86.182458428666,86.18280091322958
file name : Image_07112023142558272.png
|
2023-11-07 14:25:58.374152 |
470 |
57909949 |
PCC from Kalindi Para to Chinibas Mahato house in Kusumtikri |
250000 |
PCC from Kalindi Para to Chinibas Mahato house in Kusumtikri1 |
Plinth level |
-
latitude : 23.427843446843326,23.428081450983882
Longitude : 86.1827901005745,86.18249212391675
file name : Image_07112023092319115.png
|
2023-11-07 09:23:19.20476 |
471 |
57909949 |
PCC from Kalindi Para to Chinibas Mahato house in Kusumtikri |
250000 |
PCC from Kalindi Para to Chinibas Mahato house in Kusumtikri1 |
Completion of work |
-
latitude : 23.428048761561513,23.428048761561513,23.4278431115672
Longitude : 86.18248659186065,86.18248659186065,86.18279160931706
file name : Image_06112023162250242.png
|
2023-11-06 16:22:50.353974 |
472 |
57954940 |
Tube well with soak pit and solid platform near Chitta Mahato house at School More in Baragram |
76000 |
Tube well with soak pit and solid platform near Chitta Mahato house at School More in Baragram1 |
Roof laid |
-
latitude : 23.442294728010893
Longitude : 86.2207673303783
file name : Image_02122023104024149.png
|
2023-12-02 10:40:24.24642 |
473 |
57954940 |
Tube well with soak pit and solid platform near Chitta Mahato house at School More in Baragram |
76000 |
Tube well with soak pit and solid platform near Chitta Mahato house at School More in Baragram1 |
Plinth level |
-
latitude : 23.437863551080227
Longitude : 86.21538740582764
file name : Image_25112023145523201.png
|
2023-11-25 14:55:23.288799 |
474 |
57954940 |
Tube well with soak pit and solid platform near Chitta Mahato house at School More in Baragram |
76000 |
Tube well with soak pit and solid platform near Chitta Mahato house at School More in Baragram1 |
Completion of work |
-
latitude : 23.437831196933985
Longitude : 86.21537575498223
file name : Image_27102023121358185.png
|
2023-10-27 12:13:58.306728 |
475 |
57953753 |
Tube well with soak pit and solid platform near Manakchita Road |
76000 |
Tube well with soak pit and solid platform near Manakchita Road1 |
Roof laid |
-
latitude : 23.44248130917549
Longitude : 86.22838882729411
file name : Image_02122023102755593.png
|
2023-12-02 10:27:55.704516 |
476 |
57953753 |
Tube well with soak pit and solid platform near Manakchita Road |
76000 |
Tube well with soak pit and solid platform near Manakchita Road1 |
Plinth level |
-
latitude : 23.44242498278618
Longitude : 86.22825102880597
file name : Image_25112023151943150.png
|
2023-11-25 15:19:43.247348 |
477 |
57953753 |
Tube well with soak pit and solid platform near Manakchita Road |
76000 |
Tube well with soak pit and solid platform near Manakchita Road1 |
Completion of work |
-
latitude : 23.4424868831411
Longitude : 86.2282999791205
file name : Image_27102023110638219.png
|
2023-10-27 11:06:38.333326 |
478 |
57961746 |
Renovation of water pipeline in GP Officde |
52455 |
Renovation of water pipeline in GP Officde1 |
Roof laid |
-
latitude : 23.43882193788886,23.438809365034103
Longitude : 86.21653120033443,86.21658853255212
file name : Image_02012024155820944.png
|
2024-01-02 15:58:21.056656 |
479 |
57961746 |
Renovation of water pipeline in GP Officde |
52455 |
Renovation of water pipeline in GP Officde1 |
Plinth level |
-
latitude : 23.438806389458477,23.438804880715907
Longitude : 86.21654343791306,86.21658903546631
file name : Image_02012024155117312.png
|
2024-01-02 15:51:17.396876 |
480 |
57961746 |
Renovation of water pipeline in GP Officde |
52455 |
Renovation of water pipeline in GP Officde1 |
Completion of work |
-
latitude : 23.43885370530188,23.438852783292532
Longitude : 86.21661803685129,86.21652466244996
file name : Image_02012024154351051.png
|
2024-01-02 15:43:51.153246 |
481 |
66521982 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.422479405999184
Longitude : 86.20564537122846
file name : Image_01122023170138589.png
|
2023-12-01 17:01:38.70351 |
482 |
66521982 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.422466749325395
Longitude : 86.20568225160241
file name : Image_23112023112459261.png
|
2023-11-23 11:24:59.369937 |
483 |
66521982 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.42251758556813
Longitude : 86.20561947114766
file name : Image_22112023112540509.png
|
2023-11-22 11:25:40.605564 |
484 |
66522012 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.422957425937057
Longitude : 86.20007811114192
file name : Image_01122023165451866.png
|
2023-12-01 16:54:51.967232 |
485 |
66522012 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.42293018475175
Longitude : 86.20014047250152
file name : Image_23112023120538713.png
|
2023-11-23 12:05:38.830016 |
486 |
66522012 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.42296274844557
Longitude : 86.20008054189384
file name : Image_22112023113213823.png
|
2023-11-22 11:32:13.928222 |
487 |
66949340 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 23.44525693450123
Longitude : 86.16983368992805
file name : Image_16012024161956585.png
|
2024-01-16 16:19:56.704601 |
488 |
66949340 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 23.43065574299544
Longitude : 86.19852058589458
file name : Image_06012024140110609.png
|
2024-01-06 14:01:10.708427 |
489 |
66949340 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 23.430641912855208
Longitude : 86.19849166832864
file name : Image_02112023153404095.png
|
2023-11-02 15:34:04.278594 |
490 |
67798719 |
Construction of disable friendly in community toilet |
150000 |
Construction of disable friendly in community toilet1 |
Roof laid |
-
latitude : 23.439924870617688
Longitude : 86.17671347223222
file name : Image_06022024165255726.png
|
2024-02-06 16:52:55.824026 |
491 |
67798719 |
Construction of disable friendly in community toilet |
150000 |
Construction of disable friendly in community toilet1 |
Plinth level |
-
latitude : 23.439934132620692
Longitude : 86.17675772868097
file name : Image_02022024161348882.png
|
2024-02-02 16:13:48.981761 |
492 |
67798719 |
Construction of disable friendly in community toilet |
150000 |
Construction of disable friendly in community toilet1 |
Completion of work |
-
latitude : 23.439889457076788
Longitude : 86.1767094489187
file name : Image_09012024152337544.png
|
2024-01-09 15:23:37.641798 |
493 |
57907013 |
Construction of culvert at Kokiara |
200000 |
Construction of culvert at Kokiara1 |
Plinth level |
-
latitude : 23.4543453482911,23.454386293888092
Longitude : 86.2321870867163,86.23219798319042
file name : Image_09012024165632729.png
|
2024-01-09 16:56:32.825055 |
494 |
57907013 |
Construction of culvert at Kokiara |
200000 |
Construction of culvert at Kokiara1 |
Completion of work |
-
latitude : 23.454415588639677,23.454348323866725
Longitude : 86.23218272812665,86.2321939598769
file name : Image_09012024164924560.png
|
2024-01-09 16:49:24.705185 |
495 |
67729688 |
Pipe water connection to playground |
150000 |
Pipe water connection to playground1 |
Roof laid |
-
latitude : 23.424698766320944
Longitude : 86.2217993941158
file name : Image_15032024173823066.png
|
2024-03-15 17:38:23.18623 |
496 |
67729688 |
Pipe water connection to playground |
150000 |
Pipe water connection to playground1 |
Plinth level |
-
latitude : 23.424715781584382
Longitude : 86.22177089564502
file name : Image_03032024161223591.png
|
2024-03-03 16:12:23.706347 |
497 |
67729688 |
Pipe water connection to playground |
150000 |
Pipe water connection to playground1 |
Completion of work |
-
latitude : 23.424711883999407
Longitude : 86.22175589203835
file name : Image_03022024172052706.png
|
2024-02-03 17:20:52.807797 |
498 |
67724070 |
Piped water connection to markets |
75000 |
Piped water connection to markets1 |
Roof laid |
-
latitude : 23.43169472180307
Longitude : 86.17066659964621
file name : Image_23112023133600511.png
|
2023-11-23 13:36:00.600139 |
499 |
67724070 |
Piped water connection to markets |
75000 |
Piped water connection to markets1 |
Plinth level |
-
latitude : 23.43165222555399
Longitude : 86.17065620608628
file name : Image_22112023120353496.png
|
2023-11-22 12:03:53.595717 |
500 |
67724070 |
Piped water connection to markets |
75000 |
Piped water connection to markets1 |
Completion of work |
-
latitude : 23.42275341041386
Longitude : 86.23006612993777
file name : Image_12112023111311810.png
|
2023-11-12 11:13:11.899112 |
501 |
67739317 |
Water Supply to villages |
75000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 23.42110619880259
Longitude : 86.1705412901938
file name : Image_08042024173437707.png
|
2024-04-08 17:34:37.808076 |
502 |
67739317 |
Water Supply to villages |
75000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 23.421135200187564
Longitude : 86.17051564157009
file name : Image_13012024112654797.png
|
2024-01-13 11:26:54.91356 |
503 |
67739317 |
Water Supply to villages |
75000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.438822985626757
Longitude : 86.21626214124262
file name : Image_10012024145307939.png
|
2024-01-10 14:53:08.053255 |
504 |
67726354 |
Operation and Maintenance of drinking water supply system |
75000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 23.43127202242613
Longitude : 86.18161755613983
file name : Image_10022024140247831.png
|
2024-02-10 14:02:47.928026 |
505 |
67726354 |
Operation and Maintenance of drinking water supply system |
75000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 23.431222778744996
Longitude : 86.18159827776253
file name : Image_06022024130310616.png
|
2024-02-06 13:03:10.729704 |
506 |
67726354 |
Operation and Maintenance of drinking water supply system |
75000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 23.436955413781106
Longitude : 86.16741064935923
file name : Image_06022024125319300.png
|
2024-02-06 12:53:19.425823 |
507 |
58120448 |
Renovation of Toilet of GP Office |
87455 |
Renovation of Toilet of GP Office1 |
Roof laid |
-
latitude : 23.4388663
Longitude : 86.2163931
file name : Image_17022024143422241.png
|
2024-02-17 14:34:22.326679 |
508 |
58120448 |
Renovation of Toilet of GP Office |
87455 |
Renovation of Toilet of GP Office1 |
Plinth level |
-
latitude : 23.438839372247458
Longitude : 86.21645618230104
file name : Image_02022024121407962.png
|
2024-02-02 12:14:08.069028 |
509 |
58120448 |
Renovation of Toilet of GP Office |
87455 |
Renovation of Toilet of GP Office1 |
Completion of work |
-
latitude : 23.447808888740838
Longitude : 86.21404345147312
file name : Image_01022024152502466.png
|
2024-02-01 15:25:02.556204 |
510 |
67790899 |
Separate toilet construction for men & women in public institutions and markets in GP areas |
200000 |
Separate toilet construction for men & women in public institutions and markets in GP areas1 |
Roof laid |
-
latitude : 23.438730658963323
Longitude : 86.21526930481195
file name : Image_15122023161203217.png
|
2023-12-15 16:12:03.310582 |
511 |
67790899 |
Separate toilet construction for men & women in public institutions and markets in GP areas |
200000 |
Separate toilet construction for men & women in public institutions and markets in GP areas1 |
Plinth level |
-
latitude : 23.438720139674842
Longitude : 86.21521272696555
file name : Image_14112023184911381.png
|
2023-11-14 18:49:11.47269 |
512 |
67790899 |
Separate toilet construction for men & women in public institutions and markets in GP areas |
200000 |
Separate toilet construction for men & women in public institutions and markets in GP areas1 |
Completion of work |
-
latitude : 23.438685522414744
Longitude : 86.215287912637
file name : Image_11112023160549217.png
|
2023-11-11 16:05:49.303955 |
513 |
67727349 |
Providing piped water supply to public institutions |
75000 |
Providing piped water supply to public institutions1 |
Roof laid |
-
latitude : 23.43876196537167
Longitude : 86.21643371880054
file name : Image_25112023150556864.png
|
2023-11-25 15:05:56.973707 |
514 |
67727349 |
Providing piped water supply to public institutions |
75000 |
Providing piped water supply to public institutions1 |
Plinth level |
-
latitude : 23.43874930869788
Longitude : 86.21641628444195
file name : Image_22112023123855612.png
|
2023-11-22 12:38:55.688827 |
515 |
67727349 |
Providing piped water supply to public institutions |
75000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 23.438709662295878
Longitude : 86.21640572324395
file name : Image_12112023122127246.png
|
2023-11-12 12:21:27.327107 |
516 |
57958611 |
Tube well with soak pit and solid platform near Kelaram Mahato house in Bhelaidih |
76000 |
Tube well with soak pit and solid platform near Kelaram Mahato house in Bhelaidih1 |
Roof laid |
-
latitude : 23.430013982579112
Longitude : 86.17641432210803
file name : Image_01122023164303711.png
|
2023-12-01 16:43:03.823581 |
517 |
57958611 |
Tube well with soak pit and solid platform near Kelaram Mahato house in Bhelaidih |
76000 |
Tube well with soak pit and solid platform near Kelaram Mahato house in Bhelaidih1 |
Plinth level |
-
latitude : 23.4300387930125
Longitude : 86.17640770040452
file name : Image_23112023134711221.png
|
2023-11-23 13:47:11.317303 |
518 |
57958611 |
Tube well with soak pit and solid platform near Kelaram Mahato house in Bhelaidih |
76000 |
Tube well with soak pit and solid platform near Kelaram Mahato house in Bhelaidih1 |
Completion of work |
-
latitude : 23.430012222379446
Longitude : 86.17641348391771
file name : Image_22112023114849904.png
|
2023-11-22 11:48:50.002022 |
519 |
67804824 |
Construction of Toilets |
100000 |
Construction of Toilets1 |
Roof laid |
-
latitude : 23.442251184023917
Longitude : 86.21903738938272
file name : Image_16022024143530511.png
|
2024-02-16 14:35:30.606072 |
520 |
67804824 |
Construction of Toilets |
100000 |
Construction of Toilets1 |
Plinth level |
-
latitude : 23.44231782015413
Longitude : 86.21908566914499
file name : Image_06022024154853318.png
|
2024-02-06 15:48:53.399967 |
521 |
67804824 |
Construction of Toilets |
100000 |
Construction of Toilets1 |
Completion of work |
-
latitude : 23.41878608800471
Longitude : 86.22554836794734
file name : Image_12122023151617807.png
|
2023-12-12 15:16:18.308597 |
522 |
67740097 |
Creation of a new source of drinking water |
330000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.434625454246998
Longitude : 86.20486702769995
file name : Image_02022024132847684.png
|
2024-02-02 13:28:47.798688 |
523 |
67740097 |
Creation of a new source of drinking water |
330000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.434636685997248
Longitude : 86.20485537685454
file name : Image_30012024170503493.png
|
2024-01-30 17:05:03.620037 |
524 |
67740097 |
Creation of a new source of drinking water |
330000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.43468714505434
Longitude : 86.20485311374068
file name : Image_09122023111125738.png
|
2023-12-09 11:11:25.846721 |
525 |
67765863 |
Construction of roads |
99300 |
Construction of roads1 |
Plinth level |
-
latitude : 23.438086132518947,23.438007761724293
Longitude : 86.2008838634938,86.20111998170614
file name : Image_18122023170743802.png
|
2023-12-18 17:07:43.98478 |
526 |
67765863 |
Construction of roads |
99300 |
Construction of roads1 |
Plinth level |
-
latitude : 23.43803441617638,23.438136465847492
Longitude : 86.20111620984972,86.20084639638662
file name : Image_16122023145613204.png
|
2023-12-16 14:56:13.318051 |
527 |
67765863 |
Construction of roads |
99300 |
Construction of roads1 |
Completion of work |
-
latitude : 23.438054909929633,23.438054909929633,23.43800880946219
Longitude : 86.20075545273721,86.20075545273721,86.2011449597776
file name : Image_11122023164651476.png
|
2023-12-11 16:46:51.571511 |
528 |
67794009 |
Grey water treatment plant |
100000 |
Grey water treatment plant1 |
Roof laid |
-
latitude : 23.442486254498363
Longitude : 86.21932916343212
file name : Image_20012024162526482.png
|
2024-01-20 16:25:26.566771 |
529 |
67794009 |
Grey water treatment plant |
100000 |
Grey water treatment plant1 |
Plinth level |
-
latitude : 23.442472340539098
Longitude : 86.2192836496979
file name : Image_30122023112747237.png
|
2023-12-30 11:27:47.33585 |
530 |
67794009 |
Grey water treatment plant |
100000 |
Grey water treatment plant1 |
Completion of work |
-
latitude : 23.442458007484674
Longitude : 86.21935154311359
file name : Image_28122023090143440.png
|
2023-12-28 09:01:43.538677 |
531 |
57915139 |
PCC Road from Natabar Mahato house to Hapan Gorain house at Selani |
300000 |
PCC Road from Natabar Mahato house to Hapan Gorain house at Selani1 |
Roof laid |
-
latitude : 23.43812971841544,23.438175483606756
Longitude : 86.20072745718062,86.20084455236793
file name : Image_22032024173119320.png
|
2024-03-22 17:31:19.420581 |
532 |
57915139 |
PCC Road from Natabar Mahato house to Hapan Gorain house at Selani |
300000 |
PCC Road from Natabar Mahato house to Hapan Gorain house at Selani1 |
Plinth level |
-
latitude : 23.438125904649496,23.438179967924953
Longitude : 86.20070088654757,86.20085469447076
file name : Image_22032024172323570.png
|
2024-03-22 17:23:23.655847 |
533 |
57915139 |
PCC Road from Natabar Mahato house to Hapan Gorain house at Selani |
300000 |
PCC Road from Natabar Mahato house to Hapan Gorain house at Selani1 |
Plinth level |
-
latitude : 23.437975659035146,23.438032027333975
Longitude : 86.20031464844942,86.2001242954284
file name : Image_21032024141313552.png
|
2024-03-21 14:13:13.650934 |
534 |
57915139 |
PCC Road from Natabar Mahato house to Hapan Gorain house at Selani |
300000 |
PCC Road from Natabar Mahato house to Hapan Gorain house at Selani1 |
Completion of work |
-
latitude : 23.437995482236147,23.43802519608289
Longitude : 86.20079317130148,86.20087598450482
file name : Image_13032024161742579.png
|
2024-03-13 16:17:42.664413 |
535 |
67764666 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.42296668794006,23.423141953535378
Longitude : 86.19642779231071,86.19640490971506
file name : Image_29032024163733918.png
|
2024-03-29 16:37:34.011511 |
536 |
67764666 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.423055661842227,23.423210810869932
Longitude : 86.19639954529703,86.19635763578117
file name : Image_24032024124957924.png
|
2024-03-24 12:49:58.026969 |
537 |
67764666 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.423070539720356,23.422862039878964
Longitude : 86.196322850883,86.1964404489845
file name : Image_14032024120020814.png
|
2024-03-14 12:00:20.907279 |
538 |
67764256 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.4481605514884,23.448312263935804
Longitude : 86.17146053351462,86.17160009220243
file name : Image_08042024123836321.png
|
2024-04-08 12:38:36.435511 |
539 |
67764256 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.427713317796588,23.427715371362865
Longitude : 86.18390455842018,86.18396013043821
file name : Image_05042024130147898.png
|
2024-04-05 13:01:48.003951 |
540 |
67764256 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.427407378330827,23.427743702195585
Longitude : 86.18428585119545,86.18397974409163
file name : Image_14032024162654460.png
|
2024-03-14 16:26:54.558565 |
541 |
67826649 |
Maintenance of traditional Ponds / Tanks |
125000 |
Maintenance of traditional Ponds / Tanks1 |
Roof laid |
-
latitude : 23.445173953659832
Longitude : 86.20019135065377
file name : Image_02042024173614011.png
|
2024-04-02 17:36:14.138171 |
542 |
67826649 |
Maintenance of traditional Ponds / Tanks |
125000 |
Maintenance of traditional Ponds / Tanks1 |
Plinth level |
-
latitude : 23.445259449072182
Longitude : 86.20020853355527
file name : Image_28032024134247461.png
|
2024-03-28 13:42:47.602977 |
543 |
67826649 |
Maintenance of traditional Ponds / Tanks |
125000 |
Maintenance of traditional Ponds / Tanks1 |
Completion of work |
-
latitude : 23.445233926177025
Longitude : 86.20019344612956
file name : Image_14032024173300698.png
|
2024-03-14 17:33:00.83155 |
544 |
67796323 |
Drainage line for grey water |
200000 |
Drainage line for grey water1 |
Roof laid |
-
latitude : 23.426264547742903
Longitude : 86.18625693954527
file name : Image_09042024175741704.png
|
2024-04-09 17:57:41.779715 |
545 |
67796323 |
Drainage line for grey water |
200000 |
Drainage line for grey water1 |
Plinth level |
-
latitude : 23.42657325323671
Longitude : 86.18618468753994
file name : Image_01042024170621979.png
|
2024-04-01 17:06:22.099997 |
546 |
67796323 |
Drainage line for grey water |
200000 |
Drainage line for grey water1 |
Completion of work |
-
latitude : 23.426391826942563
Longitude : 86.18623380549252
file name : Image_16032024123218129.png
|
2024-03-16 12:32:18.232921 |
547 |
93019293 |
Operation and Maintenance of drinking/piped water supply system |
380000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 23.4387953
Longitude : 86.2163945
file name : Image_07092024112656170.png
|
2024-09-07 11:27:59.628427 |
548 |
57914637 |
Construction of Boundry wall at Jahirathan in Selani |
150000 |
Construction of Boundry wall at Jahirathan in Selani1 |
Roof laid |
-
latitude : 23.44301108736545
Longitude : 86.19289943017066
file name : Image_19062024135606441.png
|
2024-06-19 13:56:06.601738 |
549 |
57914637 |
Construction of Boundry wall at Jahirathan in Selani |
150000 |
Construction of Boundry wall at Jahirathan in Selani1 |
Plinth level |
-
latitude : 23.443046249449253
Longitude : 86.19285391643643
file name : Image_16052024111616235.png
|
2024-05-16 11:16:16.368475 |
550 |
57914637 |
Construction of Boundry wall at Jahirathan in Selani |
150000 |
Construction of Boundry wall at Jahirathan in Selani1 |
Completion of work |
-
latitude : 23.44332482200116
Longitude : 86.1929233185947
file name : Image_05022024164101907.png
|
2024-02-05 16:41:02.014699 |
551 |
67821575 |
Construction of community washing & bathing complex |
100000 |
Construction of community washing & bathing complex1 |
Roof laid |
-
latitude : 23.449202799238265
Longitude : 86.20515343733132
file name : Image_30052024120547535.png
|
2024-05-30 12:05:47.629292 |
552 |
67821575 |
Construction of community washing & bathing complex |
100000 |
Construction of community washing & bathing complex1 |
Roof laid |
-
latitude : 23.44921621028334
Longitude : 86.20519308373332
file name : Image_22052024071927246.png
|
2024-05-22 07:19:27.357595 |
553 |
67821575 |
Construction of community washing & bathing complex |
100000 |
Construction of community washing & bathing complex1 |
Plinth level |
-
latitude : 23.449327773414552
Longitude : 86.20524262078106
file name : Image_16042024173531250.png
|
2024-04-16 17:35:31.348992 |
554 |
67821575 |
Construction of community washing & bathing complex |
100000 |
Construction of community washing & bathing complex1 |
Completion of work |
-
latitude : 23.449336155317724
Longitude : 86.20526785030961
file name : Image_16032024121046959.png
|
2024-03-16 12:10:47.085546 |
555 |
67826934 |
Maintenance of traditional Ponds / Tanks |
130000 |
Maintenance of traditional Ponds / Tanks1 |
Roof laid |
-
latitude : 23.44009665772319
Longitude : 86.21966837905347
file name : Image_21062024173913672.png
|
2024-06-21 17:39:13.792501 |
556 |
67826934 |
Maintenance of traditional Ponds / Tanks |
130000 |
Maintenance of traditional Ponds / Tanks1 |
Plinth level |
-
latitude : 23.4407083
Longitude : 86.2196547
file name : Image_14062024164756329.png
|
2024-06-14 16:47:56.414179 |
557 |
67826934 |
Maintenance of traditional Ponds / Tanks |
130000 |
Maintenance of traditional Ponds / Tanks1 |
Completion of work |
-
latitude : 23.4407117
Longitude : 86.2196825
file name : Image_19032024154629633.png
|
2024-03-19 15:46:29.750917 |
558 |
67763461 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.44175790902227,23.441835148259997
Longitude : 86.16781381890178,86.16787182167172
file name : Image_09092024140842782.png
|
2024-09-09 14:08:42.875276 |
559 |
67763461 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.441689764149487,23.44177169725299
Longitude : 86.16783997043967,86.16786687634885
file name : Image_07092024135725384.png
|
2024-09-07 13:58:30.951055 |
560 |
67763461 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.441692446358502,23.441758789122105
Longitude : 86.1678146570921,86.16783351637423
file name : Image_06092024125944886.png
|
2024-09-06 12:59:44.983162 |
561 |
67763570 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.46201923210174,23.46205636393279
Longitude : 86.17732149548829,86.17707272060215
file name : Image_30102023142126588.png
|
2023-10-30 14:21:26.679936 |
562 |
67763570 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.46201386768371,23.462062943726778
Longitude : 86.17729903198779,86.17705402895808
file name : Image_30102023135826881.png
|
2023-10-30 13:58:26.969525 |
563 |
67763570 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.462033565156162,23.46203591208905
Longitude : 86.17725301533937,86.17703156545758
file name : Image_27102023114825344.png
|
2023-10-27 11:48:25.446464 |
564 |
67820860 |
Construction of community washing & bathing complex |
100000 |
Construction of community washing & bathing complex1 |
Roof laid |
-
latitude : 23.463207534514368
Longitude : 86.15833346731961
file name : Image_14032024133422863.png
|
2024-03-14 13:34:22.959097 |
565 |
67820860 |
Construction of community washing & bathing complex |
100000 |
Construction of community washing & bathing complex1 |
Plinth level |
-
latitude : 23.448024094104767
Longitude : 86.18160657584667
file name : Image_24022024145642493.png
|
2024-02-24 14:56:42.813316 |
566 |
67820860 |
Construction of community washing & bathing complex |
100000 |
Construction of community washing & bathing complex1 |
Completion of work |
-
latitude : 23.44808951485902
Longitude : 86.18162602186203
file name : Image_10022024135428268.png
|
2024-02-10 13:54:28.35292 |
567 |
92474111 |
Creation of a new source of drinking water |
330000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.422600021585822
Longitude : 86.22903901152313
file name : Image_28112024092641674.png
|
2024-11-28 09:26:41.778252 |
568 |
92474111 |
Creation of a new source of drinking water |
330000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.42252923641354
Longitude : 86.22891169041395
file name : Image_16112024162454936.png
|
2024-11-16 16:24:55.059617 |
569 |
92474111 |
Creation of a new source of drinking water |
330000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.422495792619884
Longitude : 86.22894572094083
file name : Image_15112024153446107.png
|
2024-11-15 15:34:46.194448 |
570 |
67799932 |
Construction of Toilets for male/Female |
100000 |
Construction of Toilets for male/Female1 |
Roof laid |
-
latitude : 23.444631518796086
Longitude : 86.19627851061523
file name : Image_25122023091534514.png
|
2023-12-25 09:15:34.62062 |
571 |
67799932 |
Construction of Toilets for male/Female |
100000 |
Construction of Toilets for male/Female1 |
Plinth level |
-
latitude : 23.444724935106933
Longitude : 86.19630181230605
file name : Image_01122023140159446.png
|
2023-12-01 14:01:59.561041 |
572 |
67799932 |
Construction of Toilets for male/Female |
100000 |
Construction of Toilets for male/Female1 |
Completion of work |
-
latitude : 23.444681600667536
Longitude : 86.19625210762024
file name : Image_22112023143526008.png
|
2023-11-22 14:35:26.083189 |
573 |
67801605 |
Toilet with water supply for Male and Female |
150000 |
Toilet with water supply for Male and Female1 |
Roof laid |
-
latitude : 23.449377939105034
Longitude : 86.20652295649052
file name : Image_21122023123035101.png
|
2023-12-21 12:30:35.185066 |
574 |
67801605 |
Toilet with water supply for Male and Female |
150000 |
Toilet with water supply for Male and Female1 |
Plinth level |
-
latitude : 23.445056229829788
Longitude : 86.21688592247665
file name : Image_06122023143500550.png
|
2023-12-06 14:35:00.631947 |
575 |
67801605 |
Toilet with water supply for Male and Female |
150000 |
Toilet with water supply for Male and Female1 |
Completion of work |
-
latitude : 23.44933791551739
Longitude : 86.20663720183074
file name : Image_02122023153250012.png
|
2023-12-02 15:32:50.085166 |
576 |
97819743 |
Construction of Community Sanitary Complex |
150000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.43649340327829
Longitude : 86.20490876957774
file name : Image_04102024150340226.png
|
2024-10-04 15:03:40.360186 |
577 |
97819743 |
Construction of Community Sanitary Complex |
150000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.436453295871615
Longitude : 86.20492176152766
file name : Image_03102024170616259.png
|
2024-10-03 17:06:16.343706 |
578 |
97819743 |
Construction of Community Sanitary Complex |
150000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.436405519023538
Longitude : 86.20488580316305
file name : Image_24092024125325177.png
|
2024-09-24 12:53:25.273373 |
579 |
97819743 |
Construction of Community Sanitary Complex |
150000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.436525338329375
Longitude : 86.20489208959043
file name : Image_17092024162624912.png
|
2024-09-17 16:26:25.009831 |
580 |
67802744 |
Toilet with water supply for Male and Female |
180000 |
Toilet with water supply for Male and Female1 |
Roof laid |
-
latitude : 23.441408132202923
Longitude : 86.21402920223773
file name : Image_02102024110546847.png
|
2024-10-02 11:05:46.938064 |
581 |
67802744 |
Toilet with water supply for Male and Female |
180000 |
Toilet with water supply for Male and Female1 |
Plinth level |
-
latitude : 23.441370246000588
Longitude : 86.21408787555993
file name : Image_23092024092658719.png
|
2024-09-23 09:26:58.840939 |
582 |
67802744 |
Toilet with water supply for Male and Female |
180000 |
Toilet with water supply for Male and Female1 |
Completion of work |
-
latitude : 23.441414879634976
Longitude : 86.21408720500767
file name : Image_17092024155819645.png
|
2024-09-17 15:58:19.72988 |
583 |
67792200 |
Drainage line for grey water |
150000 |
Drainage line for grey water1 |
Roof laid |
-
latitude : 23.438640888780355
Longitude : 86.21649272739887
file name : Image_15072024160014889.png
|
2024-07-15 16:00:14.98409 |
584 |
67792200 |
Drainage line for grey water |
150000 |
Drainage line for grey water1 |
Plinth level |
-
latitude : 23.44873278401792
Longitude : 86.2026400398463
file name : Image_04072024173604066.png
|
2024-07-04 17:36:04.176003 |
585 |
67792200 |
Drainage line for grey water |
150000 |
Drainage line for grey water1 |
Completion of work |
-
latitude : 23.448684001341462
Longitude : 86.20260274037719
file name : Image_28062024172700950.png
|
2024-06-28 17:27:01.050167 |
586 |
67736985 |
Tap water connections to households |
330000 |
Tap water connections to households1 |
Roof laid |
-
latitude : 23.436017227359116
Longitude : 86.19407683610916
file name : Image_24092024160700097.png
|
2024-09-24 16:07:00.178101 |
587 |
67736985 |
Tap water connections to households |
330000 |
Tap water connections to households1 |
Plinth level |
-
latitude : 23.382210228592157
Longitude : 86.17004432715476
file name : Image_06092024173118966.png
|
2024-09-06 17:31:19.093435 |
588 |
67736985 |
Tap water connections to households |
330000 |
Tap water connections to households1 |
Completion of work |
-
latitude : 23.43593969475478
Longitude : 86.19400885887444
file name : Image_25072024100343374.png
|
2024-07-25 10:03:41.808659 |
589 |
67805996 |
Construction of Toilets |
112455 |
Construction of Toilets1 |
Roof laid |
-
latitude : 23.4388524
Longitude : 86.2163504
file name : Image_04092024142413079.png
|
2024-09-04 14:24:13.16519 |
590 |
67805996 |
Construction of Toilets |
112455 |
Construction of Toilets1 |
Plinth level |
-
latitude : 23.4388181
Longitude : 86.2164146
file name : Image_23072024175228555.png
|
2024-07-23 17:52:28.636263 |
591 |
67805996 |
Construction of Toilets |
112455 |
Construction of Toilets1 |
Completion of work |
-
latitude : 23.4388441
Longitude : 86.2163969
file name : Image_08072024173534028.png
|
2024-07-08 17:35:34.121829 |
592 |
67829257 |
Drinking water facilities |
340000 |
Drinking water facilities1 |
Roof laid |
-
latitude : 23.445235770195723
Longitude : 86.21880135498941
file name : Image_06072024165132348.png
|
2024-07-06 16:51:32.432251 |
593 |
67829257 |
Drinking water facilities |
340000 |
Drinking water facilities1 |
Plinth level |
-
latitude : 23.438856680877507
Longitude : 86.21639717370272
file name : Image_22012024130146508.png
|
2024-01-22 13:01:46.594562 |
594 |
67829257 |
Drinking water facilities |
340000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 23.446723851375282
Longitude : 86.21776602230966
file name : Image_22012024125438933.png
|
2024-01-22 12:54:39.015642 |
595 |
97817979 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.433330743573606
Longitude : 86.1830536276102
file name : Image_30122024154128537.png
|
2024-12-30 15:41:28.625805 |
596 |
97817979 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.433394068852067
Longitude : 86.1830366961658
file name : Image_20102024101907485.png
|
2024-10-20 10:19:07.586049 |
597 |
97817979 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.43338857870549
Longitude : 86.18294483050704
file name : Image_26092024103235392.png
|
2024-09-26 10:32:35.478898 |
598 |
97826737 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 23.419245583936572
Longitude : 86.22468243353069
file name : Image_30122024152001524.png
|
2024-12-30 15:20:01.61386 |
599 |
97826737 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 23.419229867868125
Longitude : 86.22465938329697
file name : Image_30122024151352557.png
|
2024-12-30 15:13:52.645337 |
600 |
97826737 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.41923418454826
Longitude : 86.22470053844154
file name : Image_30122024150035885.png
|
2024-12-30 15:00:36.038888 |
601 |
97826737 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 23.41928091365844
Longitude : 86.2246613111347
file name : Image_24122024152340579.png
|
2024-12-24 15:23:40.679692 |
602 |
67796743 |
Drainage line for grey water |
250000 |
Drainage line for grey water1 |
Roof laid |
-
latitude : 23.451856384053826
Longitude : 86.23432514257729
file name : Image_09082024120825773.png
|
2024-08-09 12:08:25.868781 |
603 |
67796743 |
Drainage line for grey water |
250000 |
Drainage line for grey water1 |
Plinth level |
-
latitude : 23.45180403906852
Longitude : 86.23426630161703
file name : Image_29072024223908762.png
|
2024-07-29 22:39:08.864512 |
604 |
67796743 |
Drainage line for grey water |
250000 |
Drainage line for grey water1 |
Completion of work |
-
latitude : 23.451784090138972
Longitude : 86.23426286503673
file name : Image_23072024175247564.png
|
2024-07-23 17:52:47.660701 |
605 |
67825556 |
Construction of community washing & bathing complex |
100000 |
Construction of community washing & bathing complex1 |
Roof laid |
-
latitude : 23.440131400711834
Longitude : 86.2195635214448
file name : Image_20032024211517100.png
|
2024-03-20 21:15:17.213622 |
606 |
67825556 |
Construction of community washing & bathing complex |
100000 |
Construction of community washing & bathing complex1 |
Roof laid |
-
latitude : 23.444367488846183
Longitude : 86.16707922890782
file name : Image_18032024122016356.png
|
2024-03-18 12:20:16.452614 |
607 |
67825556 |
Construction of community washing & bathing complex |
100000 |
Construction of community washing & bathing complex1 |
Plinth level |
-
latitude : 23.444263888522983
Longitude : 86.16704075597227
file name : Image_15032024080512184.png
|
2024-03-15 08:05:12.287005 |
608 |
67825556 |
Construction of community washing & bathing complex |
100000 |
Construction of community washing & bathing complex1 |
Completion of work |
-
latitude : 23.444469035603106
Longitude : 86.16708467714489
file name : Image_10022024135447027.png
|
2024-02-10 13:54:47.125943 |
609 |
67710896 |
Creation of a new source of drinking water |
75000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.44575209543109
Longitude : 86.16506463848054
file name : Image_21112024125811787.png
|
2024-11-21 12:58:11.898716 |
610 |
67710896 |
Creation of a new source of drinking water |
75000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.445804566144943
Longitude : 86.16511568427086
file name : Image_10112024113329530.png
|
2024-11-10 11:33:29.621252 |
611 |
67710896 |
Creation of a new source of drinking water |
75000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.445766218937933
Longitude : 86.16510294377804
file name : Image_10112024112124035.png
|
2024-11-10 11:21:24.119236 |
612 |
97910142 |
Installation of Solar lights |
20000 |
Installation of Solar lights1 |
Roof laid |
-
latitude : 23.432504371739924
Longitude : 86.17270071990788
file name : Image_18102024080847451.png
|
2024-10-18 08:08:47.572955 |
613 |
97910142 |
Installation of Solar lights |
20000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.432502318173647
Longitude : 86.1727253627032
file name : Image_07102024152542210.png
|
2024-10-07 15:25:42.310991 |
614 |
97910142 |
Installation of Solar lights |
20000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.4326085
Longitude : 86.1728348
file name : Image_07102024145839632.png
|
2024-10-07 14:58:39.714267 |
615 |
97782906 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.43315262813121,23.43304114881903
Longitude : 86.18114087730646,86.18113878183067
file name : Image_04102024143525981.png
|
2024-10-04 14:35:26.371133 |
616 |
97782906 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.433111682534218,23.43302161898464
Longitude : 86.18124213069677,86.18120952509344
file name : Image_03102024154316798.png
|
2024-10-03 15:43:16.881632 |
617 |
97782906 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.433295623399317,23.433108790777624
Longitude : 86.1812617443502,86.18121698498726
file name : Image_02102024100915422.png
|
2024-10-02 10:09:14.921954 |
618 |
94903438 |
Creation of a new source of drinking water |
75000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.430539947003126
Longitude : 86.21999988332391
file name : Image_06102024171948932.png
|
2024-10-06 17:19:49.029785 |
619 |
94903438 |
Creation of a new source of drinking water |
75000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.429391123354435
Longitude : 86.2204028852284
file name : Image_04102024084906662.png
|
2024-10-04 08:49:06.754423 |
620 |
94903438 |
Creation of a new source of drinking water |
75000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.430575863458216
Longitude : 86.21996400877833
file name : Image_02102024105353158.png
|
2024-10-02 10:53:53.270798 |
621 |
93023946 |
Creation of a new source of drinking water |
75000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.422870631329715
Longitude : 86.23001826927066
file name : Image_23122024161538325.png
|
2024-12-23 16:15:38.427697 |
622 |
67740827 |
Creation of a new source of drinking water |
75000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.453681250102818
Longitude : 86.23375475406647
file name : Image_06102024164400768.png
|
2024-10-06 16:44:00.867652 |
623 |
67740827 |
Creation of a new source of drinking water |
75000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.453742605634034
Longitude : 86.23376548290253
file name : Image_04102024092822095.png
|
2024-10-04 09:28:22.189105 |
624 |
67740827 |
Creation of a new source of drinking water |
75000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.45364814158529
Longitude : 86.23375207185745
file name : Image_02102024115605842.png
|
2024-10-02 11:56:05.939199 |
625 |
67743306 |
Creation of a new source of drinking water |
75000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.445876860059798
Longitude : 86.2196547165513
file name : Image_06102024170711658.png
|
2024-10-06 17:07:11.735184 |
626 |
67743306 |
Creation of a new source of drinking water |
75000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.445975850336254
Longitude : 86.21965236961842
file name : Image_04102024100017250.png
|
2024-10-04 10:00:17.338281 |
627 |
67743306 |
Creation of a new source of drinking water |
75000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.4452393
Longitude : 86.2201376
file name : Image_02102024113719992.png
|
2024-10-02 11:37:20.086038 |
628 |
94901001 |
Creation of a new source of drinking water |
75000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.442330141551793
Longitude : 86.19611858390272
file name : Image_07102024133756085.png
|
2024-10-07 13:37:56.167298 |
629 |
94901001 |
Creation of a new source of drinking water |
75000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.44219125341624
Longitude : 86.1961555480957
file name : Image_06102024174117011.png
|
2024-10-06 17:41:17.096734 |
630 |
94901001 |
Creation of a new source of drinking water |
75000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.442367021925747
Longitude : 86.19617491029203
file name : Image_02102024123329886.png
|
2024-10-02 12:33:29.973829 |
631 |
67801143 |
Separate Toilet Facility facilities for male and female |
150000 |
Separate Toilet Facility facilities for male and female1 |
Roof laid |
-
latitude : 23.438139692880213
Longitude : 86.19331777095795
file name : Image_07042024175244431.png
|
2024-04-07 17:52:44.527714 |
632 |
67801143 |
Separate Toilet Facility facilities for male and female |
150000 |
Separate Toilet Facility facilities for male and female1 |
Plinth level |
-
latitude : 23.437999044544995
Longitude : 86.19330720975995
file name : Image_28032024134304874.png
|
2024-03-28 13:43:05.006821 |
633 |
67801143 |
Separate Toilet Facility facilities for male and female |
150000 |
Separate Toilet Facility facilities for male and female1 |
Completion of work |
-
latitude : 23.422113158740103
Longitude : 86.2233692407608
file name : Image_06032024163847065.png
|
2024-03-06 16:38:47.161957 |
634 |
97910490 |
Installation of Solar lights |
20000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.433922547847033
Longitude : 86.17328946478665
file name : Image_07102024152628677.png
|
2024-10-07 15:26:28.781216 |
635 |
97910490 |
Installation of Solar lights |
20000 |
Installation of Solar lights1 |
Plinth level |
-
latitude : 23.433922547847033
Longitude : 86.17328946478665
file name : Image_07102024152608243.png
|
2024-10-07 15:26:08.338995 |
636 |
97910490 |
Installation of Solar lights |
20000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 23.445265484042466
Longitude : 86.1866375617683
file name : Image_07102024145124073.png
|
2024-10-07 14:51:24.184088 |
637 |
67763270 |
Construction of roads |
45000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.44343600794673,23.443462075665593
Longitude : 86.1692357249558,86.16936799138784
file name : Image_03082024173603005.png
|
2024-08-03 17:36:03.132106 |
638 |
67763270 |
Construction of roads |
45000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.450568756088614,23.443458513356745
Longitude : 86.1737772077322,86.16940579377115
file name : Image_30072024181020143.png
|
2024-07-30 18:10:20.256475 |
639 |
67763270 |
Construction of roads |
45000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.443496986292303,23.443499417044222
Longitude : 86.16930554620922,86.16935181431472
file name : Image_29072024223925812.png
|
2024-07-29 22:39:25.912661 |
640 |
97926614 |
Construction of Retaining Walls/ Fencing Work |
100000 |
Construction of Retaining Walls/ Fencing Work1 |
Roof laid |
-
latitude : 23.449452705681324
Longitude : 86.19472433812916
file name : Image_23112024134625040.png
|
2024-11-23 13:46:25.118894 |
641 |
97926614 |
Construction of Retaining Walls/ Fencing Work |
100000 |
Construction of Retaining Walls/ Fencing Work1 |
Plinth level |
-
latitude : 23.42300788499415
Longitude : 86.23009563423693
file name : Image_02112024101510489.png
|
2024-11-02 10:15:10.57353 |
642 |
97926614 |
Construction of Retaining Walls/ Fencing Work |
100000 |
Construction of Retaining Walls/ Fencing Work1 |
Completion of work |
-
latitude : 23.452068655751646
Longitude : 86.20571334846318
file name : Image_20102024101839772.png
|
2024-10-20 10:18:39.889305 |
643 |
97924285 |
Construction of community washing & bathing complex |
100000 |
Construction of community washing & bathing complex1 |
Roof laid |
-
latitude : 23.43869092874229
Longitude : 86.20398801751435
file name : Image_15112024153430821.png
|
2024-11-15 15:34:30.901047 |
644 |
97924285 |
Construction of community washing & bathing complex |
100000 |
Construction of community washing & bathing complex1 |
Plinth level |
-
latitude : 23.43862546607852
Longitude : 86.20405515655875
file name : Image_02112024101143659.png
|
2024-11-02 10:11:43.747613 |
645 |
97924285 |
Construction of community washing & bathing complex |
100000 |
Construction of community washing & bathing complex1 |
Completion of work |
-
latitude : 23.4386005718261
Longitude : 86.20401995256543
file name : Image_19102024092719074.png
|
2024-10-19 09:27:19.162146 |
646 |
97921804 |
Construction of community washing & bathing complex |
100000 |
Construction of community washing & bathing complex1 |
Roof laid |
-
latitude : 23.454733514226973
Longitude : 86.18694760836661
file name : Image_11112024105951962.png
|
2024-11-11 10:59:52.048873 |
647 |
97921804 |
Construction of community washing & bathing complex |
100000 |
Construction of community washing & bathing complex1 |
Plinth level |
-
latitude : 23.45475966576487
Longitude : 86.18689170107245
file name : Image_02112024103231242.png
|
2024-11-02 10:32:31.323577 |
648 |
97921804 |
Construction of community washing & bathing complex |
100000 |
Construction of community washing & bathing complex1 |
Completion of work |
-
latitude : 23.454753505066037
Longitude : 86.18688608519733
file name : Image_20102024115250651.png
|
2024-10-20 11:52:50.730691 |
649 |
57959241 |
Tube well with soak pit and solid platform near Parikshit Gorain house in Chaitandih |
76000 |
Tube well with soak pit and solid platform near Parikshit Gorain house in Chaitandih1 |
Roof laid |
-
latitude : 23.438571360893548
Longitude : 86.19666097685695
file name : Image_27092023164141027.png
|
2023-09-27 16:41:41.11627 |
650 |
57959241 |
Tube well with soak pit and solid platform near Parikshit Gorain house in Chaitandih |
76000 |
Tube well with soak pit and solid platform near Parikshit Gorain house in Chaitandih1 |
Roof laid |
-
latitude : 23.43862760346383
Longitude : 86.1966447159648
file name : Image_31082023113413674.png
|
2023-08-31 11:34:13.778358 |
651 |
57959241 |
Tube well with soak pit and solid platform near Parikshit Gorain house in Chaitandih |
76000 |
Tube well with soak pit and solid platform near Parikshit Gorain house in Chaitandih1 |
Plinth level |
-
latitude : 23.43889791984111
Longitude : 86.21651628054678
file name : Image_05062023173310628.png
|
2023-06-05 17:33:10.726863 |
652 |
57959241 |
Tube well with soak pit and solid platform near Parikshit Gorain house in Chaitandih |
76000 |
Tube well with soak pit and solid platform near Parikshit Gorain house in Chaitandih1 |
Completion of work |
-
latitude : 23.438596255145967
Longitude : 86.1966841109097
file name : Image_02062023185325687.png
|
2023-06-02 18:53:25.980318 |
653 |
97930394 |
Construction of RAMPS |
3000 |
Construction of RAMPS1 |
Plinth level |
-
latitude : 23.4388092
Longitude : 86.2164299
file name : Image_15012025150921000.png
|
2025-01-15 15:09:11.467433 |
654 |
97930394 |
Construction of RAMPS |
3000 |
Construction of RAMPS1 |
Completion of work |
-
latitude : 23.4227186255157
Longitude : 86.2303804513067
file name : Image_15012025150344452.png
|
2025-01-15 15:03:34.944059 |
655 |
98001910 |
Creation of a new source of drinking water |
2455 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.4388011
Longitude : 86.2164325
file name : Image_15012025151813684.png
|
2025-01-15 15:18:04.142291 |
656 |
98001910 |
Creation of a new source of drinking water |
2455 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.438744908198714
Longitude : 86.21664804406464
file name : Image_15012025151600437.png
|
2025-01-15 15:15:50.96574 |
657 |
67797630 |
Drainage line for grey water |
100000 |
Drainage line for grey water1 |
Roof laid |
-
latitude : 23.446061010472476
Longitude : 86.22092901729047
file name : Image_03012024160310384.png
|
2024-01-03 16:03:10.471463 |
658 |
67797630 |
Drainage line for grey water |
100000 |
Drainage line for grey water1 |
Plinth level |
-
latitude : 23.446051748469472
Longitude : 86.22098106890917
file name : Image_23122023153247897.png
|
2023-12-23 15:32:47.313445 |
659 |
67797630 |
Drainage line for grey water |
100000 |
Drainage line for grey water1 |
Completion of work |
-
latitude : 23.446113816462457
Longitude : 86.2210141774267
file name : Image_23122023123020327.png
|
2023-12-23 12:30:20.307842 |
660 |
97801634 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 23.433991111814976
Longitude : 86.17441616021097
file name : Image_31122024154419447.png
|
2024-12-31 15:44:19.534481 |
661 |
97801634 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 23.441268783062696
Longitude : 86.17904556915164
file name : Image_27112024155351963.png
|
2024-11-27 15:53:52.060062 |
662 |
97801634 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 23.441307633183897
Longitude : 86.17912578396499
file name : Image_21112024122953254.png
|
2024-11-21 12:29:53.349717 |
663 |
67749257 |
Water Supply to villages |
40000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 23.431291300803423
Longitude : 86.19299163110554
file name : Image_07122024115849087.png
|
2024-12-07 11:58:49.02324 |
664 |
67749257 |
Water Supply to villages |
40000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 23.42522460501641
Longitude : 86.20352466590703
file name : Image_03122024123453152.png
|
2024-12-03 12:34:53.26242 |
665 |
67749257 |
Water Supply to villages |
40000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.425183156505227
Longitude : 86.20350463315845
file name : Image_28112024145021417.png
|
2024-11-28 14:50:21.505327 |
666 |
97917495 |
Construction of community washing & bathing complex |
100000 |
Construction of community washing & bathing complex1 |
Completion of work |
-
latitude : 23.45395894255489
Longitude : 86.18975068442523
file name : Image_24112024161008196.png
|
2024-11-24 16:10:08.286295 |
667 |
94968039 |
Creation of a new source of drinking water |
330000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.434153427369893
Longitude : 86.17531394585967
file name : Image_31122024152952975.png
|
2024-12-31 15:29:53.073184 |
668 |
94968039 |
Creation of a new source of drinking water |
330000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.434145129285753
Longitude : 86.17530229501426
file name : Image_31122024151511144.png
|
2024-12-31 15:15:11.251928 |
669 |
94977585 |
Operation and Maintenance of drinking/piped water supply system |
100000 |
Operation and Maintenance of drinking/piped water supply system1 |
Roof laid |
-
latitude : 23.44498883932829
Longitude : 86.21933662332594
file name : Image_30122024143450636.png
|
2024-12-30 14:34:50.725991 |
670 |
94977585 |
Operation and Maintenance of drinking/piped water supply system |
100000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 23.445028108544648
Longitude : 86.21929060667753
file name : Image_18122024134053670.png
|
2024-12-18 13:40:53.770209 |
671 |
94977585 |
Operation and Maintenance of drinking/piped water supply system |
100000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 23.444995125755668
Longitude : 86.21940351091325
file name : Image_28112024152123440.png
|
2024-11-28 15:21:23.538326 |
672 |
67724837 |
Augmentation of existing sources of Drinking Water |
25000 |
Augmentation of existing sources of Drinking Water1 |
Roof laid |
-
latitude : 23.44171117991209
Longitude : 86.18098631501198
file name : Image_27112024154108554.png
|
2024-11-27 15:41:08.673026 |
673 |
67724837 |
Augmentation of existing sources of Drinking Water |
25000 |
Augmentation of existing sources of Drinking Water1 |
Plinth level |
-
latitude : 23.441662355326116
Longitude : 86.18101724423468
file name : Image_27112024153658791.png
|
2024-11-27 15:36:59.029748 |
674 |
67724837 |
Augmentation of existing sources of Drinking Water |
25000 |
Augmentation of existing sources of Drinking Water1 |
Completion of work |
-
latitude : 23.422963293269277
Longitude : 86.23006026260555
file name : Image_27112024153049613.png
|
2024-11-27 15:30:49.776278 |
675 |
67725314 |
Augmentation of existing sources of Drinking Water |
25000 |
Augmentation of existing sources of Drinking Water1 |
Roof laid |
-
latitude : 23.433118388056755
Longitude : 86.1728326510638
file name : Image_27112024161147988.png
|
2024-11-27 16:11:48.114446 |
676 |
67725314 |
Augmentation of existing sources of Drinking Water |
25000 |
Augmentation of existing sources of Drinking Water1 |
Plinth level |
-
latitude : 23.43320555984974
Longitude : 86.17289274930954
file name : Image_27112024160639033.png
|
2024-11-27 16:06:39.233407 |
677 |
67725314 |
Augmentation of existing sources of Drinking Water |
25000 |
Augmentation of existing sources of Drinking Water1 |
Completion of work |
-
latitude : 23.433183515444398
Longitude : 86.17288160137832
file name : Image_27112024160251636.png
|
2024-11-27 16:02:51.782718 |
678 |
67764468 |
Construction of roads |
249000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.452194510027766,23.452080013230443
Longitude : 86.23391065746546,86.23389448039234
file name : Image_03042024130250174.png
|
2024-04-03 13:02:50.275555 |
679 |
67764468 |
Construction of roads |
249000 |
Construction of roads1 |
Roof laid |
-
latitude : 23.452323800884187,23.45245975535363
Longitude : 86.23397385701537,86.2339813169092
file name : Image_01042024142412179.png
|
2024-04-01 14:24:12.276478 |
680 |
67764468 |
Construction of roads |
249000 |
Construction of roads1 |
Plinth level |
-
latitude : 23.452006420120597,23.452199706807733
Longitude : 86.23390034772456,86.23396128416061
file name : Image_28032024191721137.png
|
2024-03-28 19:17:21.235344 |
681 |
67764468 |
Construction of roads |
249000 |
Construction of roads1 |
Completion of work |
-
latitude : 23.452019914984703,23.452427191659808
Longitude : 86.23380756005645,86.2339892797172
file name : Image_16032024141149157.png
|
2024-03-16 14:11:49.257125 |
682 |
67741484 |
Creation of a new source of drinking water |
75000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.44464472029358
Longitude : 86.22111165896058
file name : Image_06082024154553072.png
|
2024-08-06 15:45:53.169161 |
683 |
67741484 |
Creation of a new source of drinking water |
75000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.44468562398106
Longitude : 86.22106857597828
file name : Image_06082024153638521.png
|
2024-08-06 15:36:38.613587 |
684 |
67741484 |
Creation of a new source of drinking water |
75000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.422678015194833
Longitude : 86.2302990630269
file name : Image_30072024134225079.png
|
2024-07-30 13:42:25.278588 |