1 |
39089817 |
03 nos TUBEWELL AT LAHARIA |
207900 |
03 nos TUBEWELL AT LAHARIA 3 |
Completion of work |
-
latitude : 23.1956334
Longitude : 86.73997444
file name : Image_27122021110930563.png
|
2021-12-27 11:09:30.644302 |
2 |
96573742 |
Creation of a new source of drinking water |
96030 |
installation of tubewell at baurigora busstand |
Roof laid |
-
latitude : 23.20370101928711
Longitude : 86.748779296875
file name : Image_09042024152848905.png
|
2024-04-09 15:28:48.997319 |
3 |
96573742 |
Creation of a new source of drinking water |
96030 |
installation of tubewell at baurigora busstand |
Plinth level |
-
latitude : 23.20370101928711
Longitude : 86.748779296875
file name : Image_09042024152709317.png
|
2024-04-09 15:27:09.408586 |
4 |
96573742 |
Creation of a new source of drinking water |
96030 |
installation of tubewell at baurigora busstand |
Completion of work |
-
latitude : 23.20370101928711
Longitude : 86.748779296875
file name : Image_09042024152311499.png
|
2024-04-09 15:23:11.583833 |
5 |
39119779 |
REMUNARATION OTHER CHARGES OF WATER FACILITATOR |
59844 |
REMUNARATION OTHER CHARGES OF WATER FACILITATOR1 |
Completion of work |
-
latitude : 23.2027368
Longitude : 86.7425992
file name : Image_23052022151414826.png
|
2022-05-23 15:14:14.937645 |
6 |
35040755 |
SOLAR LIGHT AT CHHIRUDIH |
24750 |
SOLAR LIGHT AT CHHIRUDIH1 |
Completion of work |
-
latitude : 23.23002583
Longitude : 86.75607601
file name : Image_23102021093753381.png
|
2021-10-23 09:37:53.521787 |
7 |
35074635 |
SOLAR LIGHT AT CHHIRUDIH LAGADANG |
29700 |
SOLAR LIGHT AT CHHIRUDIH LAGADANG1 |
Completion of work |
-
latitude : 23.22609808
Longitude : 86.75423782
file name : Image_23102021110046442.png
|
2021-10-23 11:00:46.568565 |
8 |
35074635 |
SOLAR LIGHT AT CHHIRUDIH LAGADANG |
29700 |
SOLAR LIGHT AT CHHIRUDIH LAGADANG1 |
Completion of work |
-
latitude : 23.22609808
Longitude : 86.75423782
file name : Image_23102021110054909.png
|
2021-10-23 11:00:55.018222 |
9 |
35074635 |
SOLAR LIGHT AT CHHIRUDIH LAGADANG |
29700 |
SOLAR LIGHT AT CHHIRUDIH LAGADANG1 |
Completion of work |
-
latitude : 23.22609808
Longitude : 86.75423782
file name : Image_23102021110203832.png
|
2021-10-23 11:02:03.93569 |
10 |
35074635 |
SOLAR LIGHT AT CHHIRUDIH LAGADANG |
29700 |
SOLAR LIGHT AT CHHIRUDIH LAGADANG1 |
Completion of work |
-
latitude : 23.22609808
Longitude : 86.75423782
file name : Image_23102021110209618.png
|
2021-10-23 11:02:09.722526 |
11 |
35074237 |
SOLAR LIGHT AT CHHIRUDIH LAGADANG |
29700 |
SOLAR LIGHT AT CHHIRUDIH LAGADANG1 |
Completion of work |
-
latitude : 23.22577922
Longitude : 86.75482403
file name : Image_23102021110041261.png
|
2021-10-23 11:00:41.422667 |
12 |
35074237 |
SOLAR LIGHT AT CHHIRUDIH LAGADANG |
29700 |
SOLAR LIGHT AT CHHIRUDIH LAGADANG1 |
Completion of work |
-
latitude : 23.22577922
Longitude : 86.75482403
file name : Image_23102021110156188.png
|
2021-10-23 11:01:56.339909 |
13 |
35071918 |
SOLAR LIGHT AT CHHIRUDIH LAGADANG |
29700 |
SOLAR LIGHT AT CHHIRUDIH LAGADANG1 |
Completion of work |
-
latitude : 23.22559825
Longitude : 86.7552231
file name : Image_23102021110028776.png
|
2021-10-23 11:00:28.947682 |
14 |
35071918 |
SOLAR LIGHT AT CHHIRUDIH LAGADANG |
29700 |
SOLAR LIGHT AT CHHIRUDIH LAGADANG1 |
Completion of work |
-
latitude : 23.22559825
Longitude : 86.7552231
file name : Image_23102021110149833.png
|
2021-10-23 11:01:49.977466 |
15 |
35074976 |
SOLAR LIGHT AT CHHIRUDIH LAGADANG |
29700 |
SOLAR LIGHT AT CHHIRUDIH LAGADANG1 |
Completion of work |
-
latitude : 23.22635024
Longitude : 86.75571672
file name : Image_23102021110013420.png
|
2021-10-23 11:00:13.563497 |
16 |
35058877 |
SOLAR LIGHT TWO FACE AT RAIDIH |
39600 |
SOLAR LIGHT TWO FACE AT RAIDIH1 |
Completion of work |
-
latitude : 23.22946691
Longitude : 86.75005178
file name : Image_23102021093202868.png
|
2021-10-23 09:32:03.011017 |
17 |
35056456 |
SOLAR LIGHT TWO FACE AT RAIDIH |
39600 |
SOLAR LIGHT TWO FACE AT RAIDIH1 |
Completion of work |
-
latitude : 23.22930558
Longitude : 86.75078344
file name : Image_23102021093036989.png
|
2021-10-23 09:30:37.123404 |
18 |
35055777 |
SOLAR LIGHT TWO FACE AT RAIDIH |
39600 |
SOLAR LIGHT TWO FACE AT RAIDIH1 |
Completion of work |
-
latitude : 23.22880752
Longitude : 86.75100808
file name : Image_23102021092938831.png
|
2021-10-23 09:29:38.965013 |
19 |
35058382 |
SOLAR LIGHT TWO FACE AT RAIDIH |
39600 |
SOLAR LIGHT TWO FACE AT RAIDIH1 |
Completion of work |
-
latitude : 23.22812908
Longitude : 86.75087814
file name : Image_23102021092720475.png
|
2021-10-23 09:27:20.600562 |
20 |
35057883 |
SOLAR LIGHT TWO FACE AT RAIDIH |
39600 |
SOLAR LIGHT TWO FACE AT RAIDIH1 |
Completion of work |
-
latitude : 23.22721052
Longitude : 86.75047311
file name : Image_23102021092624570.png
|
2021-10-23 09:26:24.691941 |
21 |
39090385 |
TWO FACE SOLAR LIGHT AT RAGHUNATH JEW MANDIR |
29700 |
TWO FACE SOLAR LIGHT AT RAGHUNATH JEW MANDIR1 |
Completion of work |
-
latitude : 23.23027935
Longitude : 86.75757388
file name : Image_23102021094454712.png
|
2021-10-23 09:44:54.888042 |
22 |
35055210 |
SOLAR LIGHT TWO FACE AT RAIDIH |
39600 |
SOLAR LIGHT TWO FACE AT RAIDIH 1 |
Completion of work |
-
latitude : 23.22697147
Longitude : 86.74982304
file name : Image_23102021092446770.png
|
2021-10-23 09:24:46.884311 |
23 |
35039467 |
SOLAR LIGHT AT CHHIRUDIH |
24750 |
SOLAR LIGHT AT CHHIRUDIH1 |
Completion of work |
-
latitude : 23.23056711
Longitude : 86.75644414
file name : Image_23102021093844017.png
|
2021-10-23 09:38:44.127496 |
24 |
39092944 |
TUBEWELL AT KENDTIAR THAN |
69683 |
TUBEWELL AT KENDTIAR THAN1 |
Completion of work |
-
latitude : 23.23109193
Longitude : 86.75846917
file name : Image_05102021115900663.png
|
2021-10-05 11:59:00.794047 |
25 |
39093086 |
TUBEWELL WITH SOAKPIT AT CHAKALTAGORA |
74962 |
TUBEWELL WITH SOAKPIT AT CHAKALTAGORA1 |
Completion of work |
-
latitude : 23.24218568
Longitude : 86.73834175
file name : Image_02102021082332503.png
|
2021-10-02 08:23:32.593702 |
26 |
39093357 |
TUBEWELL AT TURRAH SEKH PARA |
99310 |
TUBEWELL AT TURRAH SEKH PARA1 |
Completion of work |
-
latitude : 23.2027831
Longitude : 86.7425914
file name : Image_05102021084652543.png
|
2021-10-05 08:46:52.649076 |
27 |
39088193 |
TUBEWELL AT BHAGABANDH VILLAGE |
99310 |
TUBEWELL AT BHAGABANDH VILLAGE1 |
Plinth level |
-
latitude : 23.18839537
Longitude : 86.74306536
file name : Image_11112021111208882.png
|
2021-11-11 11:12:08.987581 |
28 |
39088193 |
TUBEWELL AT BHAGABANDH VILLAGE |
99310 |
TUBEWELL AT BHAGABANDH VILLAGE1 |
Completion of work |
-
latitude : 23.1886685
Longitude : 86.7433007
file name : Image_22092021135349037.png
|
2021-09-22 13:53:49.150145 |
29 |
35076925 |
SOLAR LIGHT AT NEAR NIBARAN CH HOUSE |
29700 |
SOLAR LIGHT AT NEAR NIBARAN CH HOUSE1 |
Completion of work |
-
latitude : 23.20405312
Longitude : 86.7780973
file name : Image_23102021110127386.png
|
2021-10-23 11:01:27.505621 |
30 |
35076472 |
SOLAR LIGHT AT RAGHUNATHPUR SAITHALI PARA ICDS CENTER |
29700 |
SOLAR LIGHT AT RAGHUNATHPUR SAITHALI PARA ICDS CENTER1 |
Completion of work |
-
latitude : 23.21019917
Longitude : 86.77911576
file name : Image_23102021110100786.png
|
2021-10-23 11:01:00.916468 |
31 |
35076472 |
SOLAR LIGHT AT RAGHUNATHPUR SAITHALI PARA ICDS CENTER |
29700 |
SOLAR LIGHT AT RAGHUNATHPUR SAITHALI PARA ICDS CENTER1 |
Completion of work |
-
latitude : 23.21019917
Longitude : 86.77911576
file name : Image_23102021110216445.png
|
2021-10-23 11:02:16.610422 |
32 |
35075683 |
SOLAR LIGHT AT MURGAGORA NAMOPARA USAREN HOUSE |
29700 |
SOLAR LIGHT AT MURGAGORA NAMOPARA USAREN HOUSE1 |
Completion of work |
-
latitude : 23.21294676
Longitude : 86.78338886
file name : Image_23102021110108735.png
|
2021-10-23 11:01:08.882899 |
33 |
39093400 |
TUBEWELL AT DEBGRAM MAJH PARA |
99310 |
TUBEWELL AT DEBGRAM MAJH PARA1 |
Plinth level |
-
latitude : 23.17592664
Longitude : 86.74301086
file name : Image_28122021163115409.png
|
2021-12-28 16:31:15.522397 |
34 |
39093400 |
TUBEWELL AT DEBGRAM MAJH PARA |
99310 |
TUBEWELL AT DEBGRAM MAJH PARA1 |
Plinth level |
-
latitude : 23.17592664
Longitude : 86.74301086
file name : Image_28122021163131831.png
|
2021-12-28 16:31:31.946652 |
35 |
39093400 |
TUBEWELL AT DEBGRAM MAJH PARA |
99310 |
TUBEWELL AT DEBGRAM MAJH PARA1 |
Completion of work |
-
latitude : 23.1881248
Longitude : 86.7461761
file name : Image_14072021084649464.png
|
2021-07-14 08:46:49.573929 |
36 |
35109336 |
SOLAR LIGHT AT DEBGRAM |
29700 |
SOLAR LIGHT AT DEBGRAM1 |
Completion of work |
-
latitude : 23.17488348
Longitude : 86.74405882
file name : Image_23102021110133768.png
|
2021-10-23 11:01:33.960013 |
37 |
39093252 |
TUBEWELL AT DHENGAKEND |
99310 |
TUBEWELL AT DHENGAKEND1 |
Completion of work |
-
latitude : 23.22121588
Longitude : 86.77780798
file name : Image_18112021171920959.png
|
2021-11-18 17:19:21.054762 |
38 |
35075323 |
SOLAR LIGHT AT MURGAGORA UPAR PARA SARASWATI |
29700 |
SOLAR LIGHT AT MURGAGORA UPAR PARA SARASWATI 1 |
Completion of work |
-
latitude : 23.21480203
Longitude : 86.78207762
file name : Image_23102021110117763.png
|
2021-10-23 11:01:17.901291 |
39 |
39093274 |
TUBEWELL AT ARALI CHOWRASTA |
99000 |
TUBEWELL AT ARALI CHOWRASTA1 |
Completion of work |
-
latitude : 23.21273326
Longitude : 86.76627956
file name : Image_28102021121548695.png
|
2021-10-28 12:15:48.793749 |
40 |
39093263 |
TUBEWELL AT ARALI NAMOKULI |
99000 |
TUBEWELL AT ARALI NAMOKULI1 |
Completion of work |
-
latitude : 23.21531891
Longitude : 86.76682446
file name : Image_28102021133838959.png
|
2021-10-28 13:38:39.067007 |
41 |
39089813 |
TUBEWELL AT TUSUGORIA PATRA PARA |
99000 |
TUBEWELL AT TUSUGORIA PATRA PARA1 |
Completion of work |
-
latitude : 23.18854144
Longitude : 86.74298523
file name : Image_17112021110037805.png
|
2021-11-17 11:00:37.921523 |
42 |
34977105 |
TUBEWELL AT UPARBAID ICDS |
99000 |
TUBEWELL AT UPARBAID ICDS 1 |
Completion of work |
-
latitude : 23.1786219
Longitude : 86.72786788
file name : Image_12112021153222220.png
|
2021-11-12 15:32:22.319772 |
43 |
35067693 |
PCC ROAD AT CHHIRUDIH LAGADANG TALTAL |
180000 |
PCC ROAD AT CHHIRUDIH LAGADANG TALTAL 1 |
Completion of work |
-
latitude : 23.22634332,23.22632036
Longitude : 86.75580956,86.7558043
file name : Image_11022022174908088.png
|
2022-02-11 17:49:08.198506 |
44 |
35038628 |
BATHING GHAT AT CAHNDANPUR SAYER |
74250 |
BATHING GHAT AT CAHNDANPUR SAYER1 |
Completion of work |
-
latitude : 23.2027842
Longitude : 86.7425999
file name : Image_24092021152815719.png
|
2021-09-24 15:28:15.818973 |
45 |
35010806 |
PCC ROAD AT ALGUMIR S MUDIR TO SUBHASH MUDI |
99000 |
PCC ROAD AT ALGUMIR S MUDIR TO SUBHASH MUDI1 |
Completion of work |
-
latitude : 23.20890981,23.20874461
Longitude : 86.73752389,86.73733141
file name : Image_17112021102113635.png
|
2021-11-17 10:21:13.791385 |
46 |
39089819 |
PCC ROAD AT LAHAIRA MUKTAMANCHA TO SOLAR PUMP |
158400 |
PCC ROAD AT LAHAIRA MUKTAMANCHA TO SOLAR PUMP1 |
Completion of work |
-
latitude : 23.19718985,23.19719174
Longitude : 86.74003355,86.74006697
file name : Image_15112021125314618.png
|
2021-11-15 12:53:14.746313 |
47 |
35104203 |
PROTECTION WALL AT KUSUMGORIA BANDH |
247500 |
PROTECTION WALL AT KUSUMGORIA BANDH1 |
Completion of work |
-
latitude : 23.18823115
Longitude : 86.74722131
file name : Image_17112021105638873.png
|
2021-11-17 10:56:39.016431 |
48 |
35093988 |
PCC ROAD at PORADIH VILLAGE ROAD |
148500 |
PCC ROAD at PORADIH VILLAGE ROAD1 |
Completion of work |
-
latitude : 23.18789856,23.18754305
Longitude : 86.75267138,86.75243712
file name : Image_17112021123637429.png
|
2021-11-17 12:36:37.55565 |
49 |
39089832 |
TUBEWELL AT NAMOGORA |
99310 |
TUBEWELL AT NAMOGORA1 |
Completion of work |
-
latitude : 23.2027824
Longitude : 86.7425948
file name : Image_02102021174131810.png
|
2021-10-02 17:41:31.925492 |
50 |
39093202 |
05 NOS TUBEWELL AT CHHIRUDIH LAGADANG |
297000 |
05 NOS TUBEWELL AT CHHIRUDIH LAGADANG1 |
Completion of work |
-
latitude : 23.1881212
Longitude : 86.7461691
file name : Image_07102021100838424.png
|
2021-10-07 10:08:38.533484 |
51 |
39093202 |
05 NOS TUBEWELL AT CHHIRUDIH LAGADANG |
297000 |
05 NOS TUBEWELL AT CHHIRUDIH LAGADANG1 |
Completion of work |
-
latitude : 23.22892267
Longitude : 86.75667498
file name : Image_05102021115912599.png
|
2021-10-05 11:59:12.714647 |
52 |
39093202 |
05 NOS TUBEWELL AT CHHIRUDIH LAGADANG |
297000 |
05 NOS TUBEWELL AT CHHIRUDIH LAGADANG2 |
Completion of work |
-
latitude : 23.1881212
Longitude : 86.7461691
file name : Image_07102021101445789.png
|
2021-10-07 10:14:45.879988 |
53 |
39093202 |
05 NOS TUBEWELL AT CHHIRUDIH LAGADANG |
297000 |
05 NOS TUBEWELL AT CHHIRUDIH LAGADANG2 |
Completion of work |
-
latitude : 23.22191015
Longitude : 86.75264997
file name : Image_05102021115915528.png
|
2021-10-05 11:59:15.635749 |
54 |
39093202 |
05 NOS TUBEWELL AT CHHIRUDIH LAGADANG |
297000 |
05 NOS TUBEWELL AT CHHIRUDIH LAGADANG3 |
Completion of work |
-
latitude : 23.2027779
Longitude : 86.7425949
file name : Image_08102021114113358.png
|
2021-10-08 11:41:13.467342 |
55 |
39093202 |
05 NOS TUBEWELL AT CHHIRUDIH LAGADANG |
297000 |
05 NOS TUBEWELL AT CHHIRUDIH LAGADANG3 |
Completion of work |
-
latitude : 23.22857004
Longitude : 86.75347406
file name : Image_05102021110841816.png
|
2021-10-05 11:08:41.936436 |
56 |
39093202 |
05 NOS TUBEWELL AT CHHIRUDIH LAGADANG |
297000 |
05 NOS TUBEWELL AT CHHIRUDIH LAGADANG4 |
Completion of work |
-
latitude : 23.22467754
Longitude : 86.75404004
file name : Image_05102021110312069.png
|
2021-10-05 11:03:12.185344 |
57 |
39093202 |
05 NOS TUBEWELL AT CHHIRUDIH LAGADANG |
297000 |
05 NOS TUBEWELL AT CHHIRUDIH LAGADANG5 |
Completion of work |
-
latitude : 23.22529311
Longitude : 86.76428772
file name : Image_05102021105409251.png
|
2021-10-05 10:54:09.356324 |
58 |
39089817 |
03 nos TUBEWELL AT LAHARIA |
207900 |
03 nos TUBEWELL AT LAHARIA 1 |
Completion of work |
-
latitude : 23.1881212
Longitude : 86.7461691
file name : Image_07102021103215580.png
|
2021-10-07 10:32:15.681869 |
59 |
39089817 |
03 nos TUBEWELL AT LAHARIA |
207900 |
03 nos TUBEWELL AT LAHARIA 2 |
Completion of work |
-
latitude : 23.19589906
Longitude : 86.74228587
file name : Image_12112021113735548.png
|
2021-11-12 11:37:35.656257 |
60 |
39093302 |
05 NOS TUBEWELL AT PORADIH |
297000 |
05 NOS TUBEWELL AT PORADIH1 |
Completion of work |
-
latitude : 23.1871763
Longitude : 86.7497503
file name : Image_07102021110129426.png
|
2021-10-07 11:01:29.519762 |
61 |
39093302 |
05 NOS TUBEWELL AT PORADIH |
297000 |
05 NOS TUBEWELL AT PORADIH2 |
Completion of work |
-
latitude : 23.1871763
Longitude : 86.7497503
file name : Image_07102021110134265.png
|
2021-10-07 11:01:34.352906 |
62 |
39093302 |
05 NOS TUBEWELL AT PORADIH |
297000 |
05 NOS TUBEWELL AT PORADIH3 |
Completion of work |
-
latitude : 23.1871763
Longitude : 86.7497503
file name : Image_07102021110416061.png
|
2021-10-07 11:04:16.152543 |
63 |
39093302 |
05 NOS TUBEWELL AT PORADIH |
297000 |
05 NOS TUBEWELL AT PORADIH4 |
Completion of work |
-
latitude : 23.18811641
Longitude : 86.75424179
file name : Image_07102021110608103.png
|
2021-10-07 11:06:08.199721 |
64 |
39093302 |
05 NOS TUBEWELL AT PORADIH |
297000 |
05 NOS TUBEWELL AT PORADIH5 |
Completion of work |
-
latitude : 23.18728424
Longitude : 86.74936026
file name : Image_07102021111127018.png
|
2021-10-07 11:11:27.106348 |
65 |
35010455 |
PCC ROAD AT PANDATOLA M SARDAR HOUSE TO U BAURI |
99000 |
PCC ROAD AT PANDATOLA M SARDAR HOUSE TO U BAURI 1 |
Completion of work |
-
latitude : 23.20356486,23.20356558
Longitude : 86.74280442,86.74294029
file name : Image_23112021115021240.png
|
2021-11-23 11:50:21.357479 |
66 |
34973063 |
PCC ROAD AT MEDICAL SHOP TO DIPAK HOUSE |
297000 |
PCC ROAD AT MEDICAL SHOP TO DIPAK HOUSE1 |
Completion of work |
-
latitude : 23.1879865,23.1878449
Longitude : 86.7398898,86.74016325
file name : Image_04122021112826790.png
|
2021-12-04 11:28:26.920606 |
67 |
34973063 |
PCC ROAD AT MEDICAL SHOP TO DIPAK HOUSE |
297000 |
PCC ROAD AT MEDICAL SHOP TO DIPAK HOUSE1 |
Completion of work |
-
latitude : 23.18772432,23.187723
Longitude : 86.74018665,86.74018464
file name : Image_04122021113004936.png
|
2021-12-04 11:30:05.040966 |
68 |
35077987 |
TUBEWELL NEAR PRADHAN SAREN HOUSE AT RAGHUNATHPUR |
99000 |
TUBEWELL NEAR PRADHAN SAREN HOUSE AT RAGHUNATHPUR1 |
Completion of work |
-
latitude : 23.21792974
Longitude : 86.77136552
file name : Image_13122021112702788.png
|
2021-12-13 11:27:02.892081 |
69 |
35078271 |
TUBEWELL NEAR NABIN MURMU HOUSE AT RAGHUNATHPUR |
99000 |
TUBEWELL NEAR NABIN MURMU HOUSE AT RAGHUNATHPUR1 |
Completion of work |
-
latitude : 23.2027823
Longitude : 86.7426016
file name : Image_04082022145857059.png
|
2022-08-04 14:58:57.169381 |
70 |
35077612 |
TUBEWELL AT RAGHUNATHPUR SAITHALI PARA NEAR MITAN SAREN |
99000 |
TUBEWELL AT RAGHUNATHPUR SAITHALI PARA NEAR MITAN SAREN1 |
Completion of work |
-
latitude : 23.21022172
Longitude : 86.77180154
file name : Image_13122021113210400.png
|
2021-12-13 11:32:10.552853 |
71 |
39093133 |
DEEP BORING FOR SOLAR PUMP |
99000 |
DEEP BORING FOR SOLAR PUMP1 |
Completion of work |
-
latitude : 23.2437977
Longitude : 86.73975946
file name : Image_31122021104123411.png
|
2021-12-31 10:41:23.545854 |
72 |
39093346 |
TUBEWELL AT MUDIPARA |
99000 |
TUBEWELL AT MUDIPARA1 |
Completion of work |
-
latitude : 23.17665603
Longitude : 86.74868284
file name : Image_28122021163125366.png
|
2021-12-28 16:31:25.475502 |
73 |
39093391 |
TUBEWELL AT MAHULDANGA BAURI PARA |
99000 |
TUBEWELL AT MAHULDANGA BAURI PARA1 |
Completion of work |
-
latitude : 23.17100543
Longitude : 86.74695287
file name : Image_28122021163120084.png
|
2021-12-28 16:31:20.196241 |
74 |
39093174 |
SOLAR PUMP WITH TOWER TANK |
257400 |
SOLAR PUMP WITH TOWER TANK1 |
Completion of work |
-
latitude : 23.23636612
Longitude : 86.75153302
file name : Image_10032022123936663.png
|
2022-03-10 12:39:36.765855 |
75 |
39093120 |
SOLAR PUMP WITH TOWER TANK |
257400 |
SOLAR PUMP WITH TOWER TANK1 |
Completion of work |
-
latitude : 23.24386468
Longitude : 86.73974884
file name : Image_23022022093605002.png
|
2022-02-23 09:36:05.153365 |
76 |
35105384 |
CONSTRUCTION OF SHG MEETING HALL AT SIMAKANLI |
297000 |
CONSTRUCTION OF SHG MEETING HALL AT SIMAKANLI1 |
Completion of work |
-
latitude : 23.18060488
Longitude : 86.75757936
file name : Image_23022022134754842.png
|
2022-02-23 13:47:54.953425 |
77 |
39093366 |
TUBEWELL AT KUTIDAS PARA |
99000 |
TUBEWELL AT KUTIDAS PARA1 |
Completion of work |
-
latitude : 23.18957646
Longitude : 86.74313097
file name : Image_06012022163425426.png
|
2022-01-06 16:34:25.537321 |
78 |
39093381 |
TUBEWELL AT DEBGRAM UTKAL PARA |
99000 |
TUBEWELL AT DEBGRAM UTKAL PARA1 |
Completion of work |
-
latitude : 23.23017289
Longitude : 86.73340617
file name : Image_07012022130918359.png
|
2022-01-07 13:09:18.455663 |
79 |
35081416 |
PCC ROAD AT DHENGAKEND |
297000 |
PCC ROAD AT DHENGAKEND 1 |
Completion of work |
-
latitude : 23.22132218,23.22135795
Longitude : 86.77721628,86.77668666
file name : Image_28022022121914567.png
|
2022-02-28 12:19:14.659423 |
80 |
39093188 |
DEEP BORING FOR SOLAR PUMP |
99000 |
DEEP BORING FOR SOLAR PUMP1 |
Completion of work |
-
latitude : 23.23635417
Longitude : 86.7514573
file name : Image_10032022124142430.png
|
2022-03-10 12:41:42.524266 |
81 |
35111086 |
CONSTRUCTION OF SHG MEETING HALL AT DEBGRAM |
267300 |
CONSTRUCTION OF SHG MEETING HALL AT DEBGRAM1 |
Completion of work |
-
latitude : 23.187308
Longitude : 86.7494457
file name : Image_15032022102254262.png
|
2022-03-15 10:22:54.379294 |
82 |
35009787 |
BATHING GHAT AT BELGHORIA PUKUR |
99000 |
BATHING GHAT AT BELGHORIA PUKUR 1 |
Completion of work |
-
latitude : 23.20291132
Longitude : 86.74312527
file name : Image_11022022141001865.png
|
2022-02-11 14:10:01.95135 |
83 |
39093025 |
BATHING GHAT AT GHOLKURD NAMUKULI JORBANDH |
99000 |
BATHING GHAT AT GHOLKURD NAMUKULI JORBANDH1 |
Completion of work |
-
latitude : 23.23486094
Longitude : 86.73281398
file name : Image_29032022083537664.png
|
2022-03-29 08:35:37.785991 |
84 |
39119776 |
TUBEWELL WAGES PAYMENT |
180000 |
TUBEWELL WAGES PAYMENT1 |
Completion of work |
-
latitude : 23.2027795
Longitude : 86.7426005
file name : Image_26042022155829719.png
|
2022-04-26 15:58:29.968115 |
85 |
39093001 |
PIPE LINE FOR DRINKING WATER CHHIRUDIH GIRLS SCHOOL |
118000 |
PIPE LINE FOR DRINKING WATER CHHIRUDIH GIRLS SCHOOL1 |
Completion of work |
-
latitude : 23.21588349,23.22972392
Longitude : 86.74358927,86.75191201
file name : Image_23052022164900478.png
|
2022-05-23 16:49:00.591487 |
86 |
35010165 |
BATHING GHAT AT KADAM BANDH |
99000 |
BATHING GHAT AT KADAM BANDH1 |
Completion of work |
-
latitude : 23.19657786
Longitude : 86.73743092
file name : Image_15062022163904617.png
|
2022-06-15 16:39:04.728459 |
87 |
35037128 |
CONSTRUCTION OF SHG MEETING HALL at CHHIRUDIH |
198000 |
CONSTRUCTION OF SHG MEETING HALL at CHHIRUDIH 1 |
Completion of work |
-
latitude : 23.22867524
Longitude : 86.7555583
file name : Image_19072022142100448.png
|
2022-07-19 14:21:00.551139 |
88 |
47299066 |
INSTALLATION OF 02 NO TUBEWELL AT DEBGRAM SANSAD |
145209 |
INSTALLATION OF 02 NO TUBEWELL AT DEBGRAM SANSAD1 |
Completion of work |
-
latitude : 23.2027839
Longitude : 86.7425997
file name : Image_03082022130223925.png
|
2022-08-03 13:02:24.007917 |
89 |
47299066 |
INSTALLATION OF 02 NO TUBEWELL AT DEBGRAM SANSAD |
145209 |
INSTALLATION OF 02 NO TUBEWELL AT DEBGRAM SANSAD2 |
Completion of work |
-
latitude : 23.2027839
Longitude : 86.7425997
file name : Image_03082022130229030.png
|
2022-08-03 13:02:29.111932 |
90 |
47299066 |
INSTALLATION OF 02 NO TUBEWELL AT DEBGRAM SANSAD |
145209 |
INSTALLATION OF 02 NO TUBEWELL AT DEBGRAM SANSAD2 |
Completion of work |
-
latitude : 23.2027839
Longitude : 86.7425997
file name : Image_03082022130233642.png
|
2022-08-03 13:02:33.724227 |
91 |
47296697 |
INSTALLATION OF TUBEWELL AT RAGHUNATHPUR UPAR PARA |
72605 |
INSTALLATION OF TUBEWELL AT RAGHUNATHPUR UPAR PARA 1 |
Completion of work |
-
latitude : 23.2027823
Longitude : 86.7426016
file name : Image_04082022145646055.png
|
2022-08-04 14:56:46.164722 |
92 |
96574119 |
Creation of a new source of drinking water |
95040 |
INSTALLATION OF TUBEWELL AT PORADIH LAYEK PARA |
Roof laid |
-
latitude : 23.181318283081055
Longitude : 86.7472915649414
file name : Image_08042024160159447.png
|
2024-04-08 16:01:59.539362 |
93 |
96574119 |
Creation of a new source of drinking water |
95040 |
INSTALLATION OF TUBEWELL AT PORADIH LAYEK PARA |
Plinth level |
-
latitude : 23.181318283081055
Longitude : 86.7472915649414
file name : Image_08042024120252631.png
|
2024-04-08 12:02:52.852074 |
94 |
96574119 |
Creation of a new source of drinking water |
95040 |
INSTALLATION OF TUBEWELL AT PORADIH LAYEK PARA |
Completion of work |
-
latitude : 23.181318283081055
Longitude : 86.7472915649414
file name : Image_08042024114451474.png
|
2024-04-08 11:44:51.586952 |
95 |
47296535 |
INSTALLATION OF TUBEWELL NEAR SAMSAN GHAT AT GHOLKURD |
62932 |
INSTALLATION OF TUBEWELL NEAR SAMSAN GHAT AT GHOLKURD1 |
Completion of work |
-
latitude : 23.2027829
Longitude : 86.7426009
file name : Image_23112022165326474.png
|
2022-11-23 16:53:26.574082 |
96 |
47296535 |
INSTALLATION OF TUBEWELL NEAR SAMSAN GHAT AT GHOLKURD |
62932 |
INSTALLATION OF TUBEWELL NEAR SAMSAN GHAT AT GHOLKURD1 |
Completion of work |
-
latitude : 23.2027829
Longitude : 86.7426009
file name : Image_23112022165312996.png
|
2022-11-23 16:53:13.094778 |
97 |
47296535 |
INSTALLATION OF TUBEWELL NEAR SAMSAN GHAT AT GHOLKURD |
62932 |
INSTALLATION OF TUBEWELL NEAR SAMSAN GHAT AT GHOLKURD1 |
Completion of work |
-
latitude : 23.23199755
Longitude : 86.74029842
file name : Image_05092022170352969.png
|
2022-09-05 17:03:53.069016 |
98 |
56739396 |
CONSTRUCTION OF DRAIN FROM LULKI SARDAR TO RANJIT SK AT SIMAKANALI |
146629 |
CONSTRUCTION OF DRAIN FROM LULKI SARDAR TO RANJIT SK AT SIMAKANALI1 |
Completion of work |
-
latitude : 23.18099095,23.18100053,23.18098789
Longitude : 86.75798291,86.75790045,86.75791509
file name : Image_04062023100200304.png
|
2023-06-04 10:02:00.395036 |
99 |
56774223 |
CONSTRUCTION OF PCC ROAD AT BAKULTOL AT CHHIRUDIH |
59400 |
CONSTRUCTION OF PCC ROAD AT BAKULTOL AT CHHIRUDIH1 |
Completion of work |
-
latitude : 23.22929609,23.22929464
Longitude : 86.75576049,86.75576048
file name : Image_04062023094847664.png
|
2023-06-04 09:48:47.754958 |
100 |
47291975 |
PCC ROAD AT DHENGAKEND BAURI PARA |
82583 |
PCC ROAD AT DHENGAKEND BAURI PARA1 |
Completion of work |
-
latitude : 23.2028283,23.2028283
Longitude : 86.7426017,86.7426017
file name : Image_17042023162613303.png
|
2023-04-17 16:26:13.403733 |
101 |
47297413 |
PCC ROAD AT GOLAK HANSDA TO PRADHAN SAREN HOUSE |
81621 |
PCC ROAD AT GOLAK HANSDA TO PRADHAN SAREN HOUSE1 |
Completion of work |
-
latitude : 23.21496826,23.21497528
Longitude : 86.78334643,86.78306258
file name : Image_03112022120335618.png
|
2022-11-03 12:03:35.707197 |
102 |
47296201 |
INSTALLATION OF TUBEWELL AT SIDHAGORA |
71161 |
INSTALLATION OF TUBEWELL AT SIDHAGORA1 |
Completion of work |
-
latitude : 23.2027829
Longitude : 86.7426009
file name : Image_23112022165226492.png
|
2022-11-23 16:52:26.597829 |
103 |
47348095 |
MAINTANCE OF TUBEWELL INCLUDING PARTS , WAGES , WATER FACILITATORS ETC |
700000 |
MAINTANCE OF TUBEWELL INCLUDING PARTS , WAGES , WATER FACILITATORS ETC1 |
Completion of work |
-
latitude : 23.2027845
Longitude : 86.7425998
file name : Image_28112022151542140.png
|
2022-11-28 15:15:42.224623 |
104 |
47292658 |
INSTALLATION OF TUBEWELL NEAR ASHAR SINGH SARDAR HOUSE AT BAURIGORA |
53463 |
INSTALLATION OF TUBEWELL NEAR ASHAR SINGH SARDAR HOUSE AT BAURIGORA1 |
Completion of work |
-
latitude : 23.2027837
Longitude : 86.7426002
file name : Image_15122022150759388.png
|
2022-12-15 15:07:59.514337 |
105 |
47291468 |
PCC ROAD AT MAIN ROAD TO NITYA GOPAL GALI |
47564 |
PCC ROAD AT MAIN ROAD TO NITYA GOPAL GALI1 |
Completion of work |
-
latitude : 23.1881801,23.1881801
Longitude : 86.7461247,86.7461247
file name : Image_06062023223212156.png
|
2023-06-06 22:32:12.246012 |
106 |
47291468 |
PCC ROAD AT MAIN ROAD TO NITYA GOPAL GALI |
47564 |
PCC ROAD AT MAIN ROAD TO NITYA GOPAL GALI1 |
Completion of work |
-
latitude : 23.1881801,23.1881801
Longitude : 86.7461247,86.7461247
file name : Image_06062023223225976.png
|
2023-06-06 22:32:26.064572 |
107 |
47291526 |
PCC ROAD AT MAIN ROAD TO SAKTIPADA PATRA GALI |
47564 |
PCC ROAD AT MAIN ROAD TO SAKTIPADA PATRA GALI1 |
Completion of work |
-
latitude : 23.1881801,23.1881801
Longitude : 86.7461247,86.7461247
file name : Image_06062023223207732.png
|
2023-06-06 22:32:07.837551 |
108 |
47291526 |
PCC ROAD AT MAIN ROAD TO SAKTIPADA PATRA GALI |
47564 |
PCC ROAD AT MAIN ROAD TO SAKTIPADA PATRA GALI1 |
Completion of work |
-
latitude : 23.1881801,23.1881801
Longitude : 86.7461247,86.7461247
file name : Image_06062023223221836.png
|
2023-06-06 22:32:21.939274 |
109 |
47293202 |
PCC ROAD AT KENDBANI VILLAGE |
77744 |
PCC ROAD AT KENDBANI VILLAGE1 |
Completion of work |
-
latitude : 23.2131946,23.2131946
Longitude : 86.7106405,86.7106405
file name : Image_14022023170835145.png
|
2023-02-14 17:08:35.236654 |
110 |
47295165 |
INSTALLATION OF TUBEWELL AT PARUDA BAURIPARA |
77455 |
INSTALLATION OF TUBEWELL AT PARUDA BAURIPARA1 |
Completion of work |
-
latitude : 23.23923334
Longitude : 86.75262159
file name : Image_17022023111601058.png
|
2023-02-17 11:16:01.150999 |
111 |
47293453 |
INSTALLATION OF 04 NO TUBEWELL AT LAHARIA SANSAD |
220537 |
INSTALLATION OF 04 NO TUBEWELL AT LAHARIA SANSAD1 |
Completion of work |
-
latitude : 23.202829
Longitude : 86.7425615
file name : Image_08022023120444493.png
|
2023-02-08 12:04:44.577728 |
112 |
47293453 |
INSTALLATION OF 04 NO TUBEWELL AT LAHARIA SANSAD |
220537 |
INSTALLATION OF 04 NO TUBEWELL AT LAHARIA SANSAD2 |
Completion of work |
-
latitude : 23.202829
Longitude : 86.7425615
file name : Image_08022023121106763.png
|
2023-02-08 12:11:06.856918 |
113 |
47293453 |
INSTALLATION OF 04 NO TUBEWELL AT LAHARIA SANSAD |
220537 |
INSTALLATION OF 04 NO TUBEWELL AT LAHARIA SANSAD3 |
Completion of work |
-
latitude : 23.202829
Longitude : 86.7425615
file name : Image_08022023121321046.png
|
2023-02-08 12:13:21.139002 |
114 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 1 |
Roof laid |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023122121899.png
|
2023-11-10 12:21:22.029288 |
115 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 1 |
Plinth level |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023120559637.png
|
2023-11-10 12:05:59.805919 |
116 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 1 |
Completion of work |
-
latitude : 23.227075576782227
Longitude : 86.74955749511719
file name : Image_10112023115207110.png
|
2023-11-10 11:52:07.193946 |
117 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 2 |
Roof laid |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023122148543.png
|
2023-11-10 12:21:48.638435 |
118 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 2 |
Plinth level |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023120620563.png
|
2023-11-10 12:06:20.648515 |
119 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 2 |
Roof laid |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023122130302.png
|
2023-11-10 12:21:30.392544 |
120 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 2 |
Plinth level |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023120603759.png
|
2023-11-10 12:06:03.849075 |
121 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 2 |
Completion of work |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023115519310.png
|
2023-11-10 11:55:19.400254 |
122 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 3 |
Roof laid |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023122212266.png
|
2023-11-10 12:22:12.377541 |
123 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 3 |
Plinth level |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023120625888.png
|
2023-11-10 12:06:25.980453 |
124 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 3 |
Completion of work |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023115534101.png
|
2023-11-10 11:55:34.2078 |
125 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 3 |
Roof laid |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023122135506.png
|
2023-11-10 12:21:35.671252 |
126 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 3 |
Plinth level |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023120607948.png
|
2023-11-10 12:06:08.034931 |
127 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 3 |
Completion of work |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023115522690.png
|
2023-11-10 11:55:22.793464 |
128 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 4 |
Roof laid |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023122216418.png
|
2023-11-10 12:22:16.510044 |
129 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 4 |
Plinth level |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023120629794.png
|
2023-11-10 12:06:29.874654 |
130 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 4 |
Roof laid |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023122139586.png
|
2023-11-10 12:21:39.686888 |
131 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 4 |
Plinth level |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023120612833.png
|
2023-11-10 12:06:12.915097 |
132 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 4 |
Completion of work |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023115537354.png
|
2023-11-10 11:55:37.45251 |
133 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 4 |
Completion of work |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023115527414.png
|
2023-11-10 11:55:27.516509 |
134 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 5 |
Roof laid |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023122220924.png
|
2023-11-10 12:22:21.015168 |
135 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 5 |
Plinth level |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023120636095.png
|
2023-11-10 12:06:36.183205 |
136 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 5 |
Completion of work |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023115530700.png
|
2023-11-10 11:55:30.81331 |
137 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 5 |
Roof laid |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023122145135.png
|
2023-11-10 12:21:45.22894 |
138 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 5 |
Plinth level |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023120616634.png
|
2023-11-10 12:06:16.71726 |
139 |
67727873 |
Electricity connection /Installation of Solar Energy |
99000 |
5 NOS SOLAR LIGHT AT CHHIRUDIH CHANDANPUR SANSAD 5 |
Completion of work |
-
latitude : 23.229162216186523
Longitude : 86.75418090820312
file name : Image_10112023115540774.png
|
2023-11-10 11:55:40.885889 |
140 |
56773173 |
CONSTRUCTION OF PCC ROAD AT LAHARIA DURGAMANDIR |
98955 |
CONSTRUCTION OF PCC ROAD AT LAHARIA DURGAMANDIR1 |
Completion of work |
-
latitude : 23.19727665,23.19728163
Longitude : 86.74010025,86.7400295
file name : Image_28022023141808321.png
|
2023-02-28 14:18:08.416014 |
141 |
47295312 |
INSTALLATION OF TUBEWELL AT RAIDIH |
73512 |
INSTALLATION OF TUBEWELL AT RAIDIH1 |
Completion of work |
-
latitude : 23.22779713
Longitude : 86.74406316
file name : Image_16032023121610354.png
|
2023-03-16 12:16:10.448566 |
142 |
47293115 |
PCC ROAD AT ALGOMIR VILLAGE |
99000 |
PCC ROAD AT ALGOMIR VILLAGE1 |
Completion of work |
-
latitude : 23.202826,23.202826
Longitude : 86.7426002,86.7426002
file name : Image_06032023160220475.png
|
2023-03-06 16:02:20.592154 |
143 |
47293115 |
PCC ROAD AT ALGOMIR VILLAGE |
99000 |
PCC ROAD AT ALGOMIR VILLAGE1 |
Completion of work |
-
latitude : 23.202826,23.202826
Longitude : 86.7426002,86.7426002
file name : Image_06032023155935001.png
|
2023-03-06 15:59:35.089088 |
144 |
56776318 |
INSTALLATION OF TUBEWELL AT CHHIRUDIH-LAGADANG |
74250 |
INSTALLATION OF TUBEWELL AT CHHIRUDIH-LAGADANG1 |
Completion of work |
-
latitude : 23.2028283
Longitude : 86.7426017
file name : Image_17042023164006059.png
|
2023-04-17 16:40:06.153837 |
145 |
56733583 |
CONSTRUCTION OF PCC ROAD AT KENDBANI |
74250 |
CONSTRUCTION OF PCC ROAD AT KENDBANI1 |
Completion of work |
-
latitude : 23.2028271,23.2028271
Longitude : 86.7425954,86.7425954
file name : Image_16032023125457708.png
|
2023-03-16 12:54:57.841146 |
146 |
47295526 |
PCC ROAD AT RAIDIH NEAR ICDS CENTER |
89100 |
PCC ROAD AT RAIDIH NEAR ICDS CENTER1 |
Completion of work |
-
latitude : 23.2275715,23.22756916
Longitude : 86.7507157,86.75071075
file name : Image_16032023121642010.png
|
2023-03-16 12:16:42.112592 |
147 |
47295526 |
PCC ROAD AT RAIDIH NEAR ICDS CENTER |
89100 |
PCC ROAD AT RAIDIH NEAR ICDS CENTER1 |
Completion of work |
-
latitude : 23.2275715,23.22756916
Longitude : 86.7507157,86.75071075
file name : Image_16032023121632536.png
|
2023-03-16 12:16:32.639046 |
148 |
47295526 |
PCC ROAD AT RAIDIH NEAR ICDS CENTER |
89100 |
PCC ROAD AT RAIDIH NEAR ICDS CENTER1 |
Completion of work |
-
latitude : 23.2275715,23.22756916
Longitude : 86.7507157,86.75071075
file name : Image_16032023121616226.png
|
2023-03-16 12:16:16.326457 |
149 |
56842913 |
INSTALLATION OF 02 NO SOLAR LIGHT AT DEBGRAM |
49900 |
INSTALLATION OF 02 NO SOLAR LIGHT AT DEBGRAM1 |
Completion of work |
-
latitude : 23.1881954
Longitude : 86.746132
file name : Image_24032023115659865.png
|
2023-03-24 11:56:59.984752 |
150 |
56842913 |
INSTALLATION OF 02 NO SOLAR LIGHT AT DEBGRAM |
49900 |
INSTALLATION OF 02 NO SOLAR LIGHT AT DEBGRAM2 |
Completion of work |
-
latitude : 23.1881954
Longitude : 86.746132
file name : Image_24032023115707642.png
|
2023-03-24 11:57:07.743869 |
151 |
47292365 |
06 NO OF SOLAR LIGHT AT SIMAKANALI |
145148 |
06 NO OF SOLAR LIGHT AT SIMAKANALI 1 |
Completion of work |
-
latitude : 23.1881954
Longitude : 86.746132
file name : Image_24032023115619945.png
|
2023-03-24 11:56:20.115616 |
152 |
47292365 |
06 NO OF SOLAR LIGHT AT SIMAKANALI |
145148 |
06 NO OF SOLAR LIGHT AT SIMAKANALI 2 |
Completion of work |
-
latitude : 23.1881954
Longitude : 86.746132
file name : Image_24032023115711957.png
|
2023-03-24 11:57:12.054836 |
153 |
47292365 |
06 NO OF SOLAR LIGHT AT SIMAKANALI |
145148 |
06 NO OF SOLAR LIGHT AT SIMAKANALI 2 |
Completion of work |
-
latitude : 23.1881954
Longitude : 86.746132
file name : Image_24032023115627137.png
|
2023-03-24 11:56:27.266893 |
154 |
47292365 |
06 NO OF SOLAR LIGHT AT SIMAKANALI |
145148 |
06 NO OF SOLAR LIGHT AT SIMAKANALI 3 |
Completion of work |
-
latitude : 23.1881954
Longitude : 86.746132
file name : Image_24032023115715879.png
|
2023-03-24 11:57:16.44883 |
155 |
47292365 |
06 NO OF SOLAR LIGHT AT SIMAKANALI |
145148 |
06 NO OF SOLAR LIGHT AT SIMAKANALI 3 |
Completion of work |
-
latitude : 23.1881954
Longitude : 86.746132
file name : Image_24032023115631631.png
|
2023-03-24 11:56:31.760382 |
156 |
47292365 |
06 NO OF SOLAR LIGHT AT SIMAKANALI |
145148 |
06 NO OF SOLAR LIGHT AT SIMAKANALI 4 |
Completion of work |
-
latitude : 23.1881954
Longitude : 86.746132
file name : Image_24032023115723275.png
|
2023-03-24 11:57:23.395717 |
157 |
47292365 |
06 NO OF SOLAR LIGHT AT SIMAKANALI |
145148 |
06 NO OF SOLAR LIGHT AT SIMAKANALI 4 |
Completion of work |
-
latitude : 23.1881954
Longitude : 86.746132
file name : Image_24032023115644259.png
|
2023-03-24 11:56:44.408083 |
158 |
47292365 |
06 NO OF SOLAR LIGHT AT SIMAKANALI |
145148 |
06 NO OF SOLAR LIGHT AT SIMAKANALI 5 |
Completion of work |
-
latitude : 23.1881954
Longitude : 86.746132
file name : Image_24032023115649697.png
|
2023-03-24 11:56:49.812977 |
159 |
47292365 |
06 NO OF SOLAR LIGHT AT SIMAKANALI |
145148 |
06 NO OF SOLAR LIGHT AT SIMAKANALI 6 |
Completion of work |
-
latitude : 23.1881954
Longitude : 86.746132
file name : Image_24032023115655232.png
|
2023-03-24 11:56:55.611943 |
160 |
56773741 |
INSTALLATION OF TUBEWELL AT CHANDANPUR |
69300 |
INSTALLATION OF TUBEWELL AT CHANDANPUR1 |
Completion of work |
-
latitude : 23.1882618
Longitude : 86.7459735
file name : Image_23032023204453482.png
|
2023-03-23 20:44:53.576159 |
161 |
47292819 |
INSTALLATION OF TUBEWELL NEAR BIMAL MANDI HOUSE AT BAURIGORA |
73888 |
INSTALLATION OF TUBEWELL NEAR BIMAL MANDI HOUSE AT BAURIGORA1 |
Completion of work |
-
latitude : 23.1891466
Longitude : 86.7438572
file name : Image_30032023094933862.png
|
2023-03-30 09:49:33.950979 |
162 |
47292819 |
INSTALLATION OF TUBEWELL NEAR BIMAL MANDI HOUSE AT BAURIGORA |
73888 |
INSTALLATION OF TUBEWELL NEAR BIMAL MANDI HOUSE AT BAURIGORA1 |
Completion of work |
-
latitude : 23.1891466
Longitude : 86.7438572
file name : Image_30032023094927284.png
|
2023-03-30 09:49:27.379522 |
163 |
47292819 |
INSTALLATION OF TUBEWELL NEAR BIMAL MANDI HOUSE AT BAURIGORA |
73888 |
INSTALLATION OF TUBEWELL NEAR BIMAL MANDI HOUSE AT BAURIGORA1 |
Completion of work |
-
latitude : 23.1891466
Longitude : 86.7438572
file name : Image_30032023094920988.png
|
2023-03-30 09:49:21.075675 |
164 |
47292819 |
INSTALLATION OF TUBEWELL NEAR BIMAL MANDI HOUSE AT BAURIGORA |
73888 |
INSTALLATION OF TUBEWELL NEAR BIMAL MANDI HOUSE AT BAURIGORA1 |
Completion of work |
-
latitude : 23.1891466
Longitude : 86.7438572
file name : Image_30032023094908692.png
|
2023-03-30 09:49:08.785681 |
165 |
47292819 |
INSTALLATION OF TUBEWELL NEAR BIMAL MANDI HOUSE AT BAURIGORA |
73888 |
INSTALLATION OF TUBEWELL NEAR BIMAL MANDI HOUSE AT BAURIGORA1 |
Completion of work |
-
latitude : 23.1891466
Longitude : 86.7438572
file name : Image_30032023094915993.png
|
2023-03-30 09:49:16.087065 |
166 |
47292819 |
INSTALLATION OF TUBEWELL NEAR BIMAL MANDI HOUSE AT BAURIGORA |
73888 |
INSTALLATION OF TUBEWELL NEAR BIMAL MANDI HOUSE AT BAURIGORA1 |
Completion of work |
-
latitude : 23.1891466
Longitude : 86.7438572
file name : Image_30032023094857975.png
|
2023-03-30 09:48:58.057896 |
167 |
47292819 |
INSTALLATION OF TUBEWELL NEAR BIMAL MANDI HOUSE AT BAURIGORA |
73888 |
INSTALLATION OF TUBEWELL NEAR BIMAL MANDI HOUSE AT BAURIGORA1 |
Completion of work |
-
latitude : 23.1891466
Longitude : 86.7438572
file name : Image_30032023094730136.png
|
2023-03-30 09:47:30.228959 |
168 |
47292819 |
INSTALLATION OF TUBEWELL NEAR BIMAL MANDI HOUSE AT BAURIGORA |
73888 |
INSTALLATION OF TUBEWELL NEAR BIMAL MANDI HOUSE AT BAURIGORA1 |
Completion of work |
-
latitude : 23.1891466
Longitude : 86.7438572
file name : Image_30032023094600492.png
|
2023-03-30 09:46:00.582633 |
169 |
47292819 |
INSTALLATION OF TUBEWELL NEAR BIMAL MANDI HOUSE AT BAURIGORA |
73888 |
INSTALLATION OF TUBEWELL NEAR BIMAL MANDI HOUSE AT BAURIGORA1 |
Completion of work |
-
latitude : 23.20528723
Longitude : 86.7458925
file name : Image_30032023094536008.png
|
2023-03-30 09:45:36.107431 |
170 |
56733862 |
CONSTRUCTION OF SHG MEETING HALL CUM MUKTAMANCHA AT BAURIGORA |
49500 |
CONSTRUCTION OF SHG MEETING HALL CUM MUKTAMANCHA AT BAURIGORA1 |
Completion of work |
-
latitude : 23.2028264
Longitude : 86.7425971
file name : Image_23032023144718128.png
|
2023-03-23 14:47:18.354637 |
171 |
47291296 |
BOUNDARY WALL AT KUSUMGORIA ROAD SIDE BANDH AT PORADIH |
308218 |
BOUNDARY WALL AT KUSUMGORIA ROAD SIDE BANDH AT PORADIH 1 |
Completion of work |
-
latitude : 23.1882606
Longitude : 86.7459781
file name : Image_28032023160426253.png
|
2023-03-28 16:04:26.423364 |
172 |
56734088 |
INSTALLATION OF TUBEWELL AT BAURIGORA BUSSTAND |
74250 |
INSTALLATION OF TUBEWELL AT BAURIGORA BUSSTAND1 |
Completion of work |
-
latitude : 23.2028266
Longitude : 86.7425933
file name : Image_28032023102954778.png
|
2023-03-28 10:29:54.869739 |
173 |
56773265 |
INSTALLATION OF TWO NO TUBEWELL AT LAHARIA |
145664 |
INSTALLATION OF TWO NO TUBEWELL AT LAHARIA1 |
Completion of work |
-
latitude : 23.2028307
Longitude : 86.7425997
file name : Image_27032023104327402.png
|
2023-03-27 10:43:27.48761 |
174 |
56773265 |
INSTALLATION OF TWO NO TUBEWELL AT LAHARIA |
145664 |
INSTALLATION OF TWO NO TUBEWELL AT LAHARIA2 |
Completion of work |
-
latitude : 23.2028307
Longitude : 86.7425997
file name : Image_27032023104339621.png
|
2023-03-27 10:43:39.725148 |
175 |
56773265 |
INSTALLATION OF TWO NO TUBEWELL AT LAHARIA |
145664 |
INSTALLATION OF TWO NO TUBEWELL AT LAHARIA2 |
Completion of work |
-
latitude : 23.2028307
Longitude : 86.7425997
file name : Image_27032023104334888.png
|
2023-03-27 10:43:34.984933 |
176 |
56774097 |
CONSTRUCTION OF PCC ROAD AT MANSA MANDIR AT CHHIRUDIH |
59400 |
CONSTRUCTION OF PCC ROAD AT MANSA MANDIR AT CHHIRUDIH1 |
Completion of work |
-
latitude : 23.202829,23.202829
Longitude : 86.7425975,86.7425975
file name : Image_28032023173102168.png
|
2023-03-28 17:31:02.257481 |
177 |
47296899 |
INSTALLATION OF TUBEWELL AT MAJHERDIH NEAR GOUR MURMU |
98542 |
INSTALLATION OF TUBEWELL AT MAJHERDIH NEAR GOUR MURMU1 |
Completion of work |
-
latitude : 23.202829
Longitude : 86.7425975
file name : Image_29032023121913644.png
|
2023-03-29 12:19:15.121225 |
178 |
47295759 |
07 NO OF SOLAR LIGHT AT PARUDA |
99855 |
04 NO OF SOLAR LIGHT AT PARUDA 1 |
Completion of work |
-
latitude : 23.23806794
Longitude : 86.75298448
file name : Image_28032023123107226.png
|
2023-03-28 12:31:07.608315 |
179 |
47295759 |
07 NO OF SOLAR LIGHT AT PARUDA |
99855 |
04 NO OF SOLAR LIGHT AT PARUDA 2 |
Completion of work |
-
latitude : 23.23843293
Longitude : 86.75238139
file name : Image_28032023123239122.png
|
2023-03-28 12:32:39.495829 |
180 |
47295759 |
07 NO OF SOLAR LIGHT AT PARUDA |
99855 |
04 NO OF SOLAR LIGHT AT PARUDA 2 |
Completion of work |
-
latitude : 23.23843293
Longitude : 86.75238139
file name : Image_28032023123119404.png
|
2023-03-28 12:31:19.554437 |
181 |
47295759 |
07 NO OF SOLAR LIGHT AT PARUDA |
99855 |
04 NO OF SOLAR LIGHT AT PARUDA 3 |
Completion of work |
-
latitude : 23.23675299
Longitude : 86.7517184
file name : Image_28032023123343112.png
|
2023-03-28 12:33:43.511392 |
182 |
47295759 |
07 NO OF SOLAR LIGHT AT PARUDA |
99855 |
04 NO OF SOLAR LIGHT AT PARUDA 3 |
Completion of work |
-
latitude : 23.23675299
Longitude : 86.7517184
file name : Image_28032023123148975.png
|
2023-03-28 12:31:49.09234 |
183 |
47295759 |
07 NO OF SOLAR LIGHT AT PARUDA |
99855 |
04 NO OF SOLAR LIGHT AT PARUDA 4 |
Completion of work |
-
latitude : 23.23665819
Longitude : 86.75150781
file name : Image_28032023123416240.png
|
2023-03-28 12:34:17.010553 |
184 |
47295759 |
07 NO OF SOLAR LIGHT AT PARUDA |
99855 |
04 NO OF SOLAR LIGHT AT PARUDA 4 |
Completion of work |
-
latitude : 23.23665819
Longitude : 86.75150781
file name : Image_28032023123406232.png
|
2023-03-28 12:34:06.372462 |
185 |
47291875 |
05 NO OF SOLAR LIGHT AT ARALI |
49950 |
02 NO OF SOLAR LIGHT AT ARALI 1 |
Completion of work |
-
latitude : 23.22970669
Longitude : 86.7332236
file name : Image_29072023131755527.png
|
2023-07-29 13:17:55.622609 |
186 |
47291875 |
05 NO OF SOLAR LIGHT AT ARALI |
49950 |
02 NO OF SOLAR LIGHT AT ARALI 1 |
Completion of work |
-
latitude : 23.21118243
Longitude : 86.76421762
file name : Image_29032023122345887.png
|
2023-03-29 12:23:46.174828 |
187 |
47291875 |
05 NO OF SOLAR LIGHT AT ARALI |
49950 |
02 NO OF SOLAR LIGHT AT ARALI 1 |
Completion of work |
-
latitude : 23.22970669
Longitude : 86.7332236
file name : Image_29072023130308801.png
|
2023-07-29 13:03:08.915271 |
188 |
47291875 |
05 NO OF SOLAR LIGHT AT ARALI |
49950 |
02 NO OF SOLAR LIGHT AT ARALI 2 |
Completion of work |
-
latitude : 23.22970669
Longitude : 86.7332236
file name : Image_29072023130454941.png
|
2023-07-29 13:04:55.026605 |
189 |
47291875 |
05 NO OF SOLAR LIGHT AT ARALI |
49950 |
02 NO OF SOLAR LIGHT AT ARALI 2 |
Completion of work |
-
latitude : 23.22970669
Longitude : 86.7332236
file name : Image_29072023131822873.png
|
2023-07-29 13:18:22.953821 |
190 |
47291875 |
05 NO OF SOLAR LIGHT AT ARALI |
49950 |
02 NO OF SOLAR LIGHT AT ARALI 2 |
Completion of work |
-
latitude : 23.22970669
Longitude : 86.7332236
file name : Image_29072023131807127.png
|
2023-07-29 13:18:07.199807 |
191 |
47291875 |
05 NO OF SOLAR LIGHT AT ARALI |
49950 |
02 NO OF SOLAR LIGHT AT ARALI 2 |
Completion of work |
-
latitude : 23.20847482
Longitude : 86.76149665
file name : Image_29032023122423200.png
|
2023-03-29 12:24:23.631609 |
192 |
47291875 |
05 NO OF SOLAR LIGHT AT ARALI |
49950 |
02 NO OF SOLAR LIGHT AT ARALI 2 |
Completion of work |
-
latitude : 23.20847482
Longitude : 86.76149665
file name : Image_29032023122354739.png
|
2023-03-29 12:23:54.901433 |
193 |
47295883 |
01 NO OF SOLAR LIGHT AT RAIDIH |
24975 |
01 NO OF SOLAR LIGHT AT RAIDIH1 |
Completion of work |
-
latitude : 23.202831
Longitude : 86.7425998
file name : Image_11042023124653979.png
|
2023-04-11 12:46:54.168425 |
194 |
56773515 |
CONSTRUCTION OF PCC ROAD ROHINI PANDA GALI |
39600 |
CONSTRUCTION OF PCC ROAD ROHINI PANDA GALI 1 |
Completion of work |
-
latitude : 23.202831,23.202831
Longitude : 86.7425998,86.7425998
file name : Image_11042023125210990.png
|
2023-04-11 12:52:11.115845 |
195 |
47292910 |
INSTALLATION OF TUBEWELL NEAR CHERU MURMU HOUSE AT BAURIGORA |
73512 |
INSTALLATION OF TUBEWELL NEAR CHERU MURMU HOUSE AT BAURIGORA1 |
Completion of work |
-
latitude : 23.2028299
Longitude : 86.7426001
file name : Image_12042023115020381.png
|
2023-04-12 11:50:20.481405 |
196 |
47297055 |
INSTALLATION OF TUBEWELL AT RAGHUNATHPUR NEAR MITAN SAREN HOUSE |
98047 |
INSTALLATION OF TUBEWELL AT RAGHUNATHPUR NEAR MITAN SAREN HOUSE1 |
Completion of work |
-
latitude : 23.20331616
Longitude : 86.74772424
file name : Image_12042023115029583.png
|
2023-04-12 11:50:29.696361 |
197 |
47297055 |
INSTALLATION OF TUBEWELL AT RAGHUNATHPUR NEAR MITAN SAREN HOUSE |
98047 |
INSTALLATION OF TUBEWELL AT RAGHUNATHPUR NEAR MITAN SAREN HOUSE1 |
Completion of work |
-
latitude : 23.20331616
Longitude : 86.74772424
file name : Image_12042023115041904.png
|
2023-04-12 11:50:42.01224 |
198 |
39092962 |
TUBEWELL AT CHHIRUDIH KADALIRTAL NEAR MALAY HOUSE |
69300 |
TUBEWELL AT CHHIRUDIH KADALIRTAL NEAR MALAY HOUSE1 |
Completion of work |
-
latitude : 23.202831
Longitude : 86.7425998
file name : Image_11042023124841266.png
|
2023-04-11 12:48:41.373033 |
199 |
56735134 |
CONSTRUCTION OF DRAIN AT PARUDA |
215725 |
CONSTRUCTION OF DRAIN AT PARUDA1 |
Completion of work |
-
latitude : 23.23846369,23.23846362
Longitude : 86.75241825,86.75241822
file name : Image_11042023111920223.png
|
2023-04-11 11:19:20.340157 |
200 |
39089839 |
MAINTENANCE OF TOILET FOR ODF PLUS at BAURIGORA |
198000 |
MAINTENANCE OF TOILET FOR ODF PLUS at BAURIGORA1 |
Completion of work |
-
latitude : 23.2028415
Longitude : 86.7431886
file name : Image_10032022125923725.png
|
2022-03-10 12:59:23.845568 |
201 |
39089839 |
MAINTENANCE OF TOILET FOR ODF PLUS at BAURIGORA |
198000 |
MAINTENANCE OF TOILET FOR ODF PLUS at BAURIGORA1 |
Completion of work |
-
latitude : 23.2027916
Longitude : 86.7431852
file name : Image_08032022132532144.png
|
2022-03-08 13:25:32.233733 |
202 |
47292192 |
DRAIN AT BARDHAKULI NAMOPARA AT ARALI |
71931 |
DRAIN AT BARDHAKULI NAMOPARA AT ARALI1 |
Completion of work |
-
latitude : 23.2028273,23.2028271
Longitude : 86.7425945,86.7425954
file name : Image_17042023145503265.png
|
2023-04-17 14:55:03.359139 |
203 |
47291700 |
INSTALLATION OF TUBEWELL AT LAYAMARA MAJHPARA |
52921 |
INSTALLATION OF TUBEWELL AT LAYAMARA MAJHPARA1 |
Completion of work |
-
latitude : 23.2028283
Longitude : 86.7426017
file name : Image_17042023163616851.png
|
2023-04-17 16:36:16.941817 |
204 |
47297952 |
INSTALLATION OF TUBEWELL AT SIYALTARD KARTIK HOUSE |
73995 |
INSTALLATION OF TUBEWELL AT SIYALTARD KARTIK HOUSE1 |
Completion of work |
-
latitude : 23.1876321
Longitude : 86.7493486
file name : Image_17042023121918853.png
|
2023-04-17 12:19:18.973733 |
205 |
47297952 |
INSTALLATION OF TUBEWELL AT SIYALTARD KARTIK HOUSE |
73995 |
INSTALLATION OF TUBEWELL AT SIYALTARD KARTIK HOUSE1 |
Completion of work |
-
latitude : 23.1876321
Longitude : 86.7493486
file name : Image_17042023122004924.png
|
2023-04-17 12:20:05.024719 |
206 |
47298150 |
INSTALLATION OF TUBEWELL NEAR RABI PATRA HOUSE |
73958 |
INSTALLATION OF TUBEWELL NEAR RABI PATRA HOUSE1 |
Completion of work |
-
latitude : 23.1876321
Longitude : 86.7493486
file name : Image_17042023121450534.png
|
2023-04-17 12:14:50.680599 |
207 |
56846561 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP |
145142 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP1 |
Completion of work |
-
latitude : 23.1882532
Longitude : 86.7459544
file name : Image_28042023104722818.png
|
2023-04-28 10:47:22.95733 |
208 |
56846561 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP |
145142 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP1 |
Completion of work |
-
latitude : 23.1882532
Longitude : 86.7459544
file name : Image_28042023105501921.png
|
2023-04-28 10:55:02.066674 |
209 |
56846561 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP |
145142 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP1 |
Completion of work |
-
latitude : 23.1882532
Longitude : 86.7459544
file name : Image_28042023105916681.png
|
2023-04-28 10:59:16.821469 |
210 |
56846561 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP |
145142 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP1 |
Completion of work |
-
latitude : 23.1882532
Longitude : 86.7459544
file name : Image_28042023105214994.png
|
2023-04-28 10:52:15.092484 |
211 |
56846561 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP |
145142 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP1 |
Completion of work |
-
latitude : 23.1882532
Longitude : 86.7459544
file name : Image_28042023115604543.png
|
2023-04-28 11:56:04.708352 |
212 |
56846561 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP |
145142 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP1 |
Completion of work |
-
latitude : 23.1882532
Longitude : 86.7459544
file name : Image_28042023111754633.png
|
2023-04-28 11:17:54.762571 |
213 |
56846561 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP |
145142 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP1 |
Completion of work |
-
latitude : 23.1882532
Longitude : 86.7459544
file name : Image_28042023111652450.png
|
2023-04-28 11:16:52.624121 |
214 |
56846561 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP |
145142 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP1 |
Completion of work |
-
latitude : 23.2033595
Longitude : 86.7458135
file name : Image_28042023115901314.png
|
2023-04-28 11:59:01.464926 |
215 |
56846561 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP |
145142 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP1 |
Completion of work |
-
latitude : 23.19702543
Longitude : 86.74043125
file name : Image_27042023181359175.png
|
2023-04-27 18:13:59.284041 |
216 |
56846561 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP |
145142 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP1 |
Completion of work |
-
latitude : 23.17521753
Longitude : 86.74293711
file name : Image_28042023080511887.png
|
2023-04-28 08:05:12.012442 |
217 |
56846561 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP |
145142 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP1 |
Completion of work |
-
latitude : 23.1870814
Longitude : 86.7497073
file name : Image_28042023072012011.png
|
2023-04-28 07:20:12.120948 |
218 |
56846561 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP |
145142 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP1 |
Completion of work |
-
latitude : 23.1870814
Longitude : 86.7497073
file name : Image_28042023074055608.png
|
2023-04-28 07:40:55.695272 |
219 |
56846561 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP |
145142 |
UPGRADATION AND MAINATANCE OF SOLAR LIGHTS OF CHHIRUDIH GP1 |
Completion of work |
-
latitude : 23.1870814
Longitude : 86.7497073
file name : Image_28042023074153282.png
|
2023-04-28 07:41:53.37502 |
220 |
56775941 |
INSTALLATION OF SOLAR LIGHT NEAR SEKHAR CHANDRA HOUSE |
19960 |
INSTALLATION OF SOLAR LIGHT NEAR SEKHAR CHANDRA HOUSE1 |
Completion of work |
-
latitude : 23.22986162
Longitude : 86.75496228
file name : Image_27042023172757548.png
|
2023-04-27 17:27:57.66666 |
221 |
56775628 |
INSTALLATION OF SOLAR LIGHT NEAR ASHOK PANDA HOUSE |
19960 |
INSTALLATION OF SOLAR LIGHT NEAR ASHOK PANDA HOUSE1 |
Completion of work |
-
latitude : 23.23005183
Longitude : 86.75365462
file name : Image_27042023172111397.png
|
2023-04-27 17:21:11.506438 |
222 |
56775252 |
INSTALLATION OF SOLAR LIGHT NEAR BULET DASH AT CHHIRUDIH |
19960 |
INSTALLATION OF SOLAR LIGHT NEAR BULET DASH AT CHHIRUDIH1 |
Completion of work |
-
latitude : 23.22958601
Longitude : 86.75448591
file name : Image_27042023172649927.png
|
2023-04-27 17:26:50.093052 |
223 |
56775071 |
INSTALLATION OF SOLAR LIGHT NEAR NISHAKAR PATI |
19960 |
INSTALLATION OF SOLAR LIGHT NEAR NISHAKAR PATI 1 |
Completion of work |
-
latitude : 23.23030635
Longitude : 86.75768282
file name : Image_27042023174528571.png
|
2023-04-27 17:45:28.669281 |
224 |
56775071 |
INSTALLATION OF SOLAR LIGHT NEAR NISHAKAR PATI |
19960 |
INSTALLATION OF SOLAR LIGHT NEAR NISHAKAR PATI 1 |
Completion of work |
-
latitude : 23.23030635
Longitude : 86.75768282
file name : Image_27042023174513354.png
|
2023-04-27 17:45:13.458868 |
225 |
56775841 |
INSTALLATION OF SOLAR LIGHT NEAR RANJIT DASH HOUSE |
19960 |
INSTALLATION OF SOLAR LIGHT NEAR RANJIT DASH HOUSE1 |
Completion of work |
-
latitude : 23.22934435
Longitude : 86.75562161
file name : Image_27042023172941139.png
|
2023-04-27 17:29:41.256701 |
226 |
56774962 |
INSTALLATION OF SOLAR LIGHT NEAR GURUPADA PATHAK HOUSE |
19960 |
INSTALLATION OF SOLAR LIGHT NEAR GURUPADA PATHAK HOUSE1 |
Completion of work |
-
latitude : 23.22969353
Longitude : 86.75595021
file name : Image_27042023174517921.png
|
2023-04-27 17:45:18.038722 |
227 |
56774962 |
INSTALLATION OF SOLAR LIGHT NEAR GURUPADA PATHAK HOUSE |
19960 |
INSTALLATION OF SOLAR LIGHT NEAR GURUPADA PATHAK HOUSE1 |
Completion of work |
-
latitude : 23.22969353
Longitude : 86.75595021
file name : Image_27042023174502449.png
|
2023-04-27 17:45:02.563611 |
228 |
56774962 |
INSTALLATION OF SOLAR LIGHT NEAR GURUPADA PATHAK HOUSE |
19960 |
INSTALLATION OF SOLAR LIGHT NEAR GURUPADA PATHAK HOUSE1 |
Completion of work |
-
latitude : 23.22970067
Longitude : 86.7558512
file name : Image_27042023174457638.png
|
2023-04-27 17:44:57.77082 |
229 |
56774385 |
INSTALLATION OF SOLAR LIGHT NEAR NAMOPARA ICDS |
19960 |
INSTALLATION OF SOLAR LIGHT NEAR NAMOPARA ICDS1 |
Completion of work |
-
latitude : 23.2301411
Longitude : 86.75795776
file name : Image_27042023174522869.png
|
2023-04-27 17:45:22.97382 |
230 |
56774385 |
INSTALLATION OF SOLAR LIGHT NEAR NAMOPARA ICDS |
19960 |
INSTALLATION OF SOLAR LIGHT NEAR NAMOPARA ICDS1 |
Completion of work |
-
latitude : 23.2301411
Longitude : 86.75795776
file name : Image_27042023174508032.png
|
2023-04-27 17:45:08.142721 |
231 |
56845445 |
Upgradation and Maintance of Tubewell of 06 no sansad |
300000 |
Upgradation and Maintance of Tubewell of 06 no sansad1 |
Completion of work |
-
latitude : 23.2028307
Longitude : 86.7425997
file name : Image_20042023163733946.png
|
2023-04-20 16:37:34.032336 |
232 |
56845445 |
Upgradation and Maintance of Tubewell of 06 no sansad |
300000 |
Upgradation and Maintance of Tubewell of 06 no sansad1 |
Completion of work |
-
latitude : 23.2028307
Longitude : 86.7425997
file name : Image_20042023163552478.png
|
2023-04-20 16:35:52.569664 |
233 |
35079772 |
TUBEWELL SOAKPIT NEAR MAJHERDIH RASHIK MURMU HOUSE |
29700 |
TUBEWELL SOAKPIT NEAR MAJHERDIH RASHIK MURMU HOUSE1 |
Completion of work |
-
latitude : 23.20839827,23.2128182
Longitude : 86.76154596,86.7673775
file name : Image_28072022113130023.png
|
2022-07-28 11:31:30.133503 |
234 |
35079772 |
TUBEWELL SOAKPIT NEAR MAJHERDIH RASHIK MURMU HOUSE |
29700 |
TUBEWELL SOAKPIT NEAR MAJHERDIH RASHIK MURMU HOUSE1 |
Completion of work |
-
latitude : 23.21067199,23.21067199
Longitude : 86.77788906,86.77788906
file name : Image_31122021162227289.png
|
2021-12-31 16:22:27.386829 |
235 |
35079112 |
TUBEWELL SOAKPIT DEAR MURGAGORA MAJHPARA |
29700 |
TUBEWELL SOAKPIT DEAR MURGAGORA MAJHPARA1 |
Completion of work |
-
latitude : 23.21062674,23.2106445
Longitude : 86.77788549,86.7779199
file name : Image_31122021162115520.png
|
2021-12-31 16:21:15.628864 |
236 |
35079112 |
TUBEWELL SOAKPIT DEAR MURGAGORA MAJHPARA |
29700 |
TUBEWELL SOAKPIT DEAR MURGAGORA MAJHPARA1 |
Completion of work |
-
latitude : 23.21487332,23.21487276
Longitude : 86.78212714,86.78212844
file name : Image_01122021110903363.png
|
2021-12-01 11:09:03.457671 |
237 |
35019169 |
BATHING GHAT AT PANDATOLA PANDA PUKUR |
99000 |
BATHING GHAT AT PANDATOLA PANDA PUKUR1 |
Completion of work |
-
latitude : 23.23070571
Longitude : 86.73367414
file name : Image_06012022163348757.png
|
2022-01-06 16:33:48.892646 |
238 |
35079446 |
TUBEWELL SOAKPIT NDEAR MURGAGORA GOLAKBIHARI HOUSE |
29700 |
TUBEWELL SOAKPIT NDEAR MURGAGORA GOLAKBIHARI HOUSE1 |
Completion of work |
-
latitude : 23.21068442,23.21068772
Longitude : 86.77789225,86.7778919
file name : Image_31122021162120810.png
|
2021-12-31 16:21:20.9114 |
239 |
35043661 |
BATHING GHAT AT DHOBABANDH |
99000 |
BATHING GHAT AT DHOBABANDH1 |
Completion of work |
-
latitude : 23.23333578
Longitude : 86.7416768
file name : Image_29032022081531505.png
|
2022-03-29 08:15:31.647928 |
240 |
39089822 |
TUBEWELL SOAKPIT Near LAHARIA PRY SCHOOL |
29700 |
TUBEWELL SOAKPIT Near LAHARIA PRY SCHOOL1 |
Completion of work |
-
latitude : 23.19571679,23.19570271
Longitude : 86.73885017,86.73886284
file name : Image_29112021141958973.png
|
2021-11-29 14:19:59.072298 |
241 |
56736543 |
CONSTRUCTION OF MUKTAMANCHA AT PORADIH |
285052 |
CONSTRUCTION OF MUKTAMANCHA AT PORADIH1 |
Completion of work |
-
latitude : 23.1870822
Longitude : 86.7497098
file name : Image_06062023223216363.png
|
2023-06-06 22:32:16.469473 |
242 |
47298478 |
PCC ROAD FROM RABI DASH TO DASH BANDH AT CHHIRUDIH LAGADANG |
95127 |
PCC ROAD FROM RABI DASH TO DASH BANDH AT CHHIRUDIH LAGADANG1 |
Completion of work |
-
latitude : 23.22873021,23.22855431
Longitude : 86.75625423,86.75704933
file name : Image_22062023073838815.png
|
2023-06-22 07:38:38.906341 |
243 |
47298478 |
PCC ROAD FROM RABI DASH TO DASH BANDH AT CHHIRUDIH LAGADANG |
95127 |
PCC ROAD FROM RABI DASH TO DASH BANDH AT CHHIRUDIH LAGADANG1 |
Completion of work |
-
latitude : 23.22873021,23.22855431
Longitude : 86.75625423,86.75704933
file name : Image_22062023073830162.png
|
2023-06-22 07:38:30.263386 |
244 |
47291817 |
INSTALLATION OF TUBEWELL AT CHHIRUDIH NEAR GOUTAM MARDANNYA HOUSE |
73512 |
INSTALLATION OF TUBEWELL AT CHHIRUDIH NEAR GOUTAM MARDANNYA HOUSE1 |
Completion of work |
-
latitude : 23.22868068
Longitude : 86.75542799
file name : Image_22062023073834275.png
|
2023-06-22 07:38:34.368 |
245 |
47291817 |
INSTALLATION OF TUBEWELL AT CHHIRUDIH NEAR GOUTAM MARDANNYA HOUSE |
73512 |
INSTALLATION OF TUBEWELL AT CHHIRUDIH NEAR GOUTAM MARDANNYA HOUSE1 |
Completion of work |
-
latitude : 23.22868068
Longitude : 86.75542799
file name : Image_22062023073826462.png
|
2023-06-22 07:38:26.554915 |
246 |
47291761 |
INSTALLATION OF TUBEWELL AT CHHIRUDIH SARDAR PARA |
73513 |
INSTALLATION OF TUBEWELL AT CHHIRUDIH SARDAR PARA1 |
Completion of work |
-
latitude : 23.22911797
Longitude : 86.75568686
file name : Image_22062023073822877.png
|
2023-06-22 07:38:22.969906 |
247 |
56777401 |
CONSTRUCTION OF BATHING GHAT AT JOLKHOKA BANDH AT BHAGABANDH |
98955 |
CONSTRUCTION OF BATHING GHAT AT JOLKHOKA BANDH AT BHAGABANDH1 |
Completion of work |
-
latitude : 23.2027371
Longitude : 86.7425612
file name : Image_28072023150813412.png
|
2023-07-28 15:08:13.594867 |
248 |
47291570 |
SOLAR LIGHT NEAR NIKHIL SARDAR HOUSE AT CHHIRUDIH |
24975 |
SOLAR LIGHT NEAR NIKHIL SARDAR HOUSE AT CHHIRUDIH1 |
Completion of work |
-
latitude : 23.1880784
Longitude : 86.7461655
file name : Image_29072023084012096.png
|
2023-07-29 08:40:12.221599 |
249 |
47291599 |
SOLAR LIGHT NEAR KALI MANDIR AT CHHIRUDIH |
24975 |
SOLAR LIGHT NEAR KALI MANDIR AT CHHIRUDIH1 |
Completion of work |
-
latitude : 23.1880784
Longitude : 86.7461655
file name : Image_29072023084016765.png
|
2023-07-29 08:40:16.849196 |
250 |
47298335 |
DRAIN FROM CHHIRUDIH UPAR BANDH TO PATHAK BANDH AT CHHIRUDIH LAGADANG SANSAD |
288596 |
DRAIN FROM CHHIRUDIH UPAR BANDH TO PATHAK BANDH AT CHHIRUDIH LAGADANG SANSAD1 |
Completion of work |
-
latitude : 23.1880784,23.1880784
Longitude : 86.7461655,86.7461655
file name : Image_28072023194007822.png
|
2023-07-28 19:40:07.900211 |
251 |
47298335 |
DRAIN FROM CHHIRUDIH UPAR BANDH TO PATHAK BANDH AT CHHIRUDIH LAGADANG SANSAD |
288596 |
DRAIN FROM CHHIRUDIH UPAR BANDH TO PATHAK BANDH AT CHHIRUDIH LAGADANG SANSAD1 |
Completion of work |
-
latitude : 23.1880784,23.1880784
Longitude : 86.7461655,86.7461655
file name : Image_29072023082459201.png
|
2023-07-29 08:24:59.284528 |
252 |
56776316 |
INSTALLATION OF DEEP TUBEWELL WITH SOLAR PUMP AT GHOLKURD SANSAD |
136759 |
INSTALLATION OF DEEP TUBEWELL WITH SOLAR PUMP AT GHOLKURD SANSAD1 |
Completion of work |
-
latitude : 23.1880784
Longitude : 86.7461655
file name : Image_28072023191552719.png
|
2023-07-28 19:15:52.799893 |
253 |
56776443 |
CONSTRUCTION OF DRAIN FROM HADHADI GORA TO SANKAR PATAR |
98955 |
CONSTRUCTION OF DRAIN FROM HADHADI GORA TO SANKAR PATAR1 |
Roof laid |
-
latitude : 23.209779739379883,23.209779739379883
Longitude : 86.78269958496094,86.78269958496094
file name : Image_30122023104116577.png
|
2023-12-30 10:41:16.708946 |
254 |
56776443 |
CONSTRUCTION OF DRAIN FROM HADHADI GORA TO SANKAR PATAR |
98955 |
CONSTRUCTION OF DRAIN FROM HADHADI GORA TO SANKAR PATAR1 |
Plinth level |
-
latitude : 23.209779739379883,23.209779739379883
Longitude : 86.78269958496094,86.78269958496094
file name : Image_30122023103729072.png
|
2023-12-30 10:37:29.169768 |
255 |
56776443 |
CONSTRUCTION OF DRAIN FROM HADHADI GORA TO SANKAR PATAR |
98955 |
CONSTRUCTION OF DRAIN FROM HADHADI GORA TO SANKAR PATAR1 |
Completion of work |
-
latitude : 23.209779739379883,23.209779739379883
Longitude : 86.78269958496094,86.78269958496094
file name : Image_30122023103446979.png
|
2023-12-30 10:34:47.06979 |
256 |
67750099 |
Drainage Construction |
99000 |
Construction of Drain at Simakanali Sansad |
Roof laid |
-
latitude : 23.178449630737305
Longitude : 86.75984954833984
file name : Image_30122023110045043.png
|
2023-12-30 11:00:45.128686 |
257 |
67750099 |
Drainage Construction |
99000 |
Construction of Drain at Simakanali Sansad |
Plinth level |
-
latitude : 23.178449630737305
Longitude : 86.75984954833984
file name : Image_30122023105852572.png
|
2023-12-30 10:58:52.661691 |
258 |
67750099 |
Drainage Construction |
99000 |
Construction of Drain at Simakanali Sansad |
Completion of work |
-
latitude : 23.178449630737305
Longitude : 86.75984954833984
file name : Image_30122023105446866.png
|
2023-12-30 10:54:46.956423 |
259 |
67750099 |
Drainage Construction |
99000 |
Construction of Drain at Simakanali Sansad |
Completion of work |
-
latitude : 23.178449630737305
Longitude : 86.75984954833984
file name : Image_30122023105234520.png
|
2023-12-30 10:52:34.619886 |
260 |
56777254 |
INSTALLATION OF DEEP TUBEWELL WITH SOLAR PUMP |
280000 |
INSTALLATION OF DEEP TUBEWELL WITH SOLAR PUMP1 |
Plinth level |
-
latitude : 23.18541145324707
Longitude : 86.75260162353516
file name : Image_30122023114644647.png
|
2023-12-30 11:46:44.750391 |
261 |
56777254 |
INSTALLATION OF DEEP TUBEWELL WITH SOLAR PUMP |
280000 |
INSTALLATION OF DEEP TUBEWELL WITH SOLAR PUMP1 |
Completion of work |
-
latitude : 23.18541145324707
Longitude : 86.75260162353516
file name : Image_30122023114455689.png
|
2023-12-30 11:44:55.78831 |
262 |
67729110 |
Construction of Building |
99000 |
CONSTRUCTION OF COMMUNITY HALL AT CHHIRUDIH PANNA PUKUR JORTOL |
Roof laid |
-
latitude : 23.231258392333984
Longitude : 86.7572250366211
file name : Image_30122023104946000.png
|
2023-12-30 10:49:46.081199 |
263 |
67729110 |
Construction of Building |
99000 |
CONSTRUCTION OF COMMUNITY HALL AT CHHIRUDIH PANNA PUKUR JORTOL |
Plinth level |
-
latitude : 23.231258392333984
Longitude : 86.7572250366211
file name : Image_30122023104723802.png
|
2023-12-30 10:47:23.916353 |
264 |
67729110 |
Construction of Building |
99000 |
CONSTRUCTION OF COMMUNITY HALL AT CHHIRUDIH PANNA PUKUR JORTOL |
Completion of work |
-
latitude : 23.231258392333984
Longitude : 86.7572250366211
file name : Image_30122023104433924.png
|
2023-12-30 10:44:34.005302 |
265 |
67734444 |
Drainage Construction |
99000 |
Construction of Drain at Baurigora sansad |
Roof laid |
-
latitude : 23.2034854888916
Longitude : 86.7489242553711
file name : Image_30122023111309563.png
|
2023-12-30 11:13:09.659531 |
266 |
67734444 |
Drainage Construction |
99000 |
Construction of Drain at Baurigora sansad |
Roof laid |
-
latitude : 23.2034854888916
Longitude : 86.7489242553711
file name : Image_30122023110855488.png
|
2023-12-30 11:08:55.578173 |
267 |
67734444 |
Drainage Construction |
99000 |
Construction of Drain at Baurigora sansad |
Plinth level |
-
latitude : 23.2034854888916
Longitude : 86.7489242553711
file name : Image_30122023110702196.png
|
2023-12-30 11:07:02.292306 |
268 |
67734444 |
Drainage Construction |
99000 |
Construction of Drain at Baurigora sansad |
Completion of work |
-
latitude : 23.2034854888916
Longitude : 86.7489242553711
file name : Image_30122023110337480.png
|
2023-12-30 11:03:37.561244 |
269 |
67723878 |
Construction of Sheds |
240000 |
CONSTRUCTION OF SAMSAN SHED AT PORADIH SILABATI RIVER |
Roof laid |
-
latitude : 23.179941177368164
Longitude : 86.7453842163086
file name : Image_03052024140021963.png
|
2024-05-03 14:00:22.07238 |
270 |
67723878 |
Construction of Sheds |
240000 |
CONSTRUCTION OF SAMSAN SHED AT PORADIH SILABATI RIVER |
Roof laid |
-
latitude : 23.17976951599121
Longitude : 86.74471282958984
file name : Image_30042024154442841.png
|
2024-04-30 15:44:42.93148 |
271 |
67723878 |
Construction of Sheds |
240000 |
CONSTRUCTION OF SAMSAN SHED AT PORADIH SILABATI RIVER |
Plinth level |
-
latitude : 23.180246353149414
Longitude : 86.74697875976562
file name : Image_30122023115112584.png
|
2023-12-30 11:51:12.662514 |
272 |
67723878 |
Construction of Sheds |
240000 |
CONSTRUCTION OF SAMSAN SHED AT PORADIH SILABATI RIVER |
Completion of work |
-
latitude : 23.180246353149414
Longitude : 86.74697875976562
file name : Image_30122023114926911.png
|
2023-12-30 11:49:26.990887 |
273 |
56736056 |
INSTALLATION OF PIPELINE FOR DRINKING WATER AT RAIDIH |
59400 |
INSTALLATION OF PIPELINE FOR DRINKING WATER AT RAIDIH1 |
Roof laid |
-
latitude : 23.226917266845703,23.226917266845703
Longitude : 86.75041198730469,86.75041198730469
file name : Image_30122023112139420.png
|
2023-12-30 11:21:39.525654 |
274 |
56736056 |
INSTALLATION OF PIPELINE FOR DRINKING WATER AT RAIDIH |
59400 |
INSTALLATION OF PIPELINE FOR DRINKING WATER AT RAIDIH1 |
Plinth level |
-
latitude : 23.226917266845703,23.226917266845703
Longitude : 86.75041198730469,86.75041198730469
file name : Image_30122023111944075.png
|
2023-12-30 11:19:44.170908 |
275 |
56736056 |
INSTALLATION OF PIPELINE FOR DRINKING WATER AT RAIDIH |
59400 |
INSTALLATION OF PIPELINE FOR DRINKING WATER AT RAIDIH1 |
Completion of work |
-
latitude : 23.226917266845703,23.226917266845703
Longitude : 86.75041198730469,86.75041198730469
file name : Image_30122023111738116.png
|
2023-12-30 11:17:38.21315 |
276 |
56738095 |
CONSTRUCTION OF BATHING GHAT AT BARA BANDH AT SIMAKANALI |
74250 |
CONSTRUCTION OF BATHING GHAT AT BARA BANDH AT SIMAKANALI1 |
Roof laid |
-
latitude : 23.180959701538086
Longitude : 86.76324462890625
file name : Image_30122023112944227.png
|
2023-12-30 11:29:44.324191 |
277 |
56738095 |
CONSTRUCTION OF BATHING GHAT AT BARA BANDH AT SIMAKANALI |
74250 |
CONSTRUCTION OF BATHING GHAT AT BARA BANDH AT SIMAKANALI1 |
Plinth level |
-
latitude : 23.180959701538086
Longitude : 86.76324462890625
file name : Image_30122023112644327.png
|
2023-12-30 11:26:44.434972 |
278 |
56738095 |
CONSTRUCTION OF BATHING GHAT AT BARA BANDH AT SIMAKANALI |
74250 |
CONSTRUCTION OF BATHING GHAT AT BARA BANDH AT SIMAKANALI1 |
Completion of work |
-
latitude : 23.180959701538086
Longitude : 86.76324462890625
file name : Image_30122023112457225.png
|
2023-12-30 11:24:57.312052 |
279 |
47295011 |
DRAIN FROM DOMPARA TO SAHERBANDH |
185509 |
DRAIN FROM DOMPARA TO SAHERBANDH1 |
Roof laid |
-
latitude : 23.196216583251953
Longitude : 86.73839569091797
file name : Image_30122023113816130.png
|
2023-12-30 11:38:16.22745 |
280 |
47295011 |
DRAIN FROM DOMPARA TO SAHERBANDH |
185509 |
DRAIN FROM DOMPARA TO SAHERBANDH1 |
Plinth level |
-
latitude : 23.196216583251953
Longitude : 86.73839569091797
file name : Image_30122023113701215.png
|
2023-12-30 11:37:01.350437 |
281 |
47295011 |
DRAIN FROM DOMPARA TO SAHERBANDH |
185509 |
DRAIN FROM DOMPARA TO SAHERBANDH1 |
Completion of work |
-
latitude : 23.196216583251953
Longitude : 86.73839569091797
file name : Image_30122023113421311.png
|
2023-12-30 11:34:21.428452 |
282 |
47292316 |
INSTALLATION OF TUBEWELL AT DHENGAKEND UPAR PARA |
73512 |
INSTALLATION OF TUBEWELL AT DHENGAKEND UPAR PARA1 |
Completion of work |
-
latitude : 23.2027337
Longitude : 86.7426393
file name : Image_23092023120116904.png
|
2023-09-23 12:01:16.989211 |
283 |
47292316 |
INSTALLATION OF TUBEWELL AT DHENGAKEND UPAR PARA |
73512 |
INSTALLATION OF TUBEWELL AT DHENGAKEND UPAR PARA1 |
Completion of work |
-
latitude : 23.2297497
Longitude : 86.73324985
file name : Image_23092023120110251.png
|
2023-09-23 12:01:10.341167 |
284 |
47292316 |
INSTALLATION OF TUBEWELL AT DHENGAKEND UPAR PARA |
73512 |
INSTALLATION OF TUBEWELL AT DHENGAKEND UPAR PARA1 |
Completion of work |
-
latitude : 23.2027337
Longitude : 86.7426393
file name : Image_23092023120101800.png
|
2023-09-23 12:01:01.877991 |
285 |
47292316 |
INSTALLATION OF TUBEWELL AT DHENGAKEND UPAR PARA |
73512 |
INSTALLATION OF TUBEWELL AT DHENGAKEND UPAR PARA1 |
Completion of work |
-
latitude : 23.2297497
Longitude : 86.73324985
file name : Image_23092023120030685.png
|
2023-09-23 12:00:30.781979 |
286 |
47292253 |
INSTALLATION OF TUBEWELL AT ARALI BANDHER PAR |
73512 |
INSTALLATION OF TUBEWELL AT ARALI BANDHER PAR1 |
Completion of work |
-
latitude : 23.2027337
Longitude : 86.7426393
file name : Image_23092023122241334.png
|
2023-09-23 12:22:41.420966 |
287 |
47292721 |
INSTALLATION OF TUBEWELL NEAR GOURANGA BAURI HOUSE AT BAURIGORA |
58083 |
INSTALLATION OF TUBEWELL NEAR GOURANGA BAURI HOUSE AT BAURIGORA1 |
Completion of work |
-
latitude : 23.20298643
Longitude : 86.74329876
file name : Image_23092023115747032.png
|
2023-09-23 11:57:47.131973 |
288 |
56735368 |
INSTALLATION OF TUBEWELL AT RAIDIH |
73366 |
INSTALLATION OF TUBEWELL AT RAIDIH1 |
Completion of work |
-
latitude : 23.2027337
Longitude : 86.7425958
file name : Image_26092023160233404.png
|
2023-09-26 16:02:33.537509 |
289 |
96574603 |
Creation of a new source of drinking water |
94050 |
raghunathpur jaher than |
Plinth level |
-
latitude : 23.225229263305664
Longitude : 86.7553939819336
file name : Image_29022024133548698.png
|
2024-02-29 13:35:48.777526 |
290 |
96574603 |
Creation of a new source of drinking water |
94050 |
raghunathpur jaher than |
Completion of work |
-
latitude : 23.225229263305664
Longitude : 86.7553939819336
file name : Image_29022024132321158.png
|
2024-02-29 13:23:21.236724 |
291 |
56845783 |
Upgradation and Maintenance of Tubewell of others 06 nos sansad |
300000 |
Upgradation and Maintenance of Tubewell of others 06 nos sansad 1 |
Completion of work |
-
latitude : 23.2027329
Longitude : 86.7425999
file name : Image_18102023103826132.png
|
2023-10-18 10:38:26.220983 |
292 |
56845783 |
Upgradation and Maintenance of Tubewell of others 06 nos sansad |
300000 |
Upgradation and Maintenance of Tubewell of others 06 nos sansad 1 |
Completion of work |
-
latitude : 23.2027329
Longitude : 86.7425999
file name : Image_18102023103841425.png
|
2023-10-18 10:38:41.509556 |
293 |
56845783 |
Upgradation and Maintenance of Tubewell of others 06 nos sansad |
300000 |
Upgradation and Maintenance of Tubewell of others 06 nos sansad 1 |
Completion of work |
-
latitude : 23.2027329
Longitude : 86.7425999
file name : Image_18102023103835282.png
|
2023-10-18 10:38:35.392505 |
294 |
47298601 |
PCC ROAD FROM TALTOL TO ANATH BAURI HOUSE AT CHHIRUDIH LAGADANG |
99000 |
PCC ROAD FROM TALTOL TO ANATH BAURI HOUSE AT CHHIRUDIH LAGADANG1 |
Roof laid |
-
latitude : 23.2308545,23.2308545
Longitude : 86.7517461,86.7517461
file name : Image_08112023145932712.png
|
2023-11-08 14:59:32.884209 |
295 |
47298601 |
PCC ROAD FROM TALTOL TO ANATH BAURI HOUSE AT CHHIRUDIH LAGADANG |
99000 |
PCC ROAD FROM TALTOL TO ANATH BAURI HOUSE AT CHHIRUDIH LAGADANG1 |
Plinth level |
-
latitude : 23.2308545,23.2308545
Longitude : 86.7517461,86.7517461
file name : Image_08112023145612825.png
|
2023-11-08 14:56:12.978083 |
296 |
47298601 |
PCC ROAD FROM TALTOL TO ANATH BAURI HOUSE AT CHHIRUDIH LAGADANG |
99000 |
PCC ROAD FROM TALTOL TO ANATH BAURI HOUSE AT CHHIRUDIH LAGADANG1 |
Completion of work |
-
latitude : 23.2308545,23.2308545
Longitude : 86.7517461,86.7517461
file name : Image_08112023144109323.png
|
2023-11-08 14:41:09.509487 |
297 |
56842254 |
INSTALLATION OF SOLAR PUMP WITH TOWER TANK AT GHOLKURD SANSAD |
194709 |
INSTALLATION OF SOLAR PUMP WITH TOWER TANK AT GHOLKURD SANSAD 1 |
Roof laid |
-
latitude : 23.2026874
Longitude : 86.7426015
file name : Image_10112023082818019.png
|
2023-11-10 08:28:18.09451 |
298 |
56842254 |
INSTALLATION OF SOLAR PUMP WITH TOWER TANK AT GHOLKURD SANSAD |
194709 |
INSTALLATION OF SOLAR PUMP WITH TOWER TANK AT GHOLKURD SANSAD 1 |
Plinth level |
-
latitude : 23.24024047
Longitude : 86.73735509
file name : Image_08112023091511332.png
|
2023-11-08 09:15:11.419879 |
299 |
56842254 |
INSTALLATION OF SOLAR PUMP WITH TOWER TANK AT GHOLKURD SANSAD |
194709 |
INSTALLATION OF SOLAR PUMP WITH TOWER TANK AT GHOLKURD SANSAD 1 |
Completion of work |
-
latitude : 23.24023108
Longitude : 86.73736125
file name : Image_08112023090249335.png
|
2023-11-08 09:02:49.433329 |
300 |
56842254 |
INSTALLATION OF SOLAR PUMP WITH TOWER TANK AT GHOLKURD SANSAD |
194709 |
INSTALLATION OF SOLAR PUMP WITH TOWER TANK AT GHOLKURD SANSAD 1 |
Completion of work |
-
latitude : 23.24022598
Longitude : 86.7373794
file name : Image_08112023085934241.png
|
2023-11-08 08:59:34.365353 |
301 |
56771561 |
CONSTRUCTION OF PCC ROAD FROM BAURI PARA TO BULAN |
184966 |
CONSTRUCTION OF PCC ROAD FROM BAURI PARA TO BULAN1 |
Roof laid |
-
latitude : 23.2026858,23.2026858
Longitude : 86.7425982,86.7425982
file name : Image_09112023095143657.png
|
2023-11-09 09:51:43.745537 |
302 |
56771561 |
CONSTRUCTION OF PCC ROAD FROM BAURI PARA TO BULAN |
184966 |
CONSTRUCTION OF PCC ROAD FROM BAURI PARA TO BULAN1 |
Plinth level |
-
latitude : 23.2026858,23.2026858
Longitude : 86.7425982,86.7425982
file name : Image_09112023094516661.png
|
2023-11-09 09:45:16.746629 |
303 |
56771561 |
CONSTRUCTION OF PCC ROAD FROM BAURI PARA TO BULAN |
184966 |
CONSTRUCTION OF PCC ROAD FROM BAURI PARA TO BULAN1 |
Completion of work |
-
latitude : 23.2308545,23.2308545
Longitude : 86.7517461,86.7517461
file name : Image_08112023151141920.png
|
2023-11-08 15:11:42.060956 |
304 |
56735749 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT RAIDIH |
49500 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT RAIDIH1 |
Roof laid |
-
latitude : 23.2026858
Longitude : 86.7425982
file name : Image_09112023091033345.png
|
2023-11-09 09:10:33.45515 |
305 |
56735749 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT RAIDIH |
49500 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT RAIDIH1 |
Plinth level |
-
latitude : 23.23026251
Longitude : 86.75175027
file name : Image_08112023141738054.png
|
2023-11-08 14:17:38.155768 |
306 |
56735749 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT RAIDIH |
49500 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT RAIDIH1 |
Completion of work |
-
latitude : 23.2308527
Longitude : 86.7517461
file name : Image_08112023140631674.png
|
2023-11-08 14:06:31.776624 |
307 |
67725090 |
Construction of roads |
134080 |
Construction of roads1 |
Roof laid |
-
latitude : 23.17536735534668,23.17536735534668
Longitude : 86.72123718261719,86.72123718261719
file name : Image_06122023081324720.png
|
2023-12-06 08:13:24.808639 |
308 |
67725090 |
Construction of roads |
134080 |
Construction of roads1 |
Plinth level |
-
latitude : 23.17536735534668,23.17536735534668
Longitude : 86.72123718261719,86.72123718261719
file name : Image_06122023080421392.png
|
2023-12-06 08:04:21.479036 |
309 |
67725090 |
Construction of roads |
134080 |
Construction of roads1 |
Completion of work |
-
latitude : 23.2026912,23.2026912
Longitude : 86.7426001,86.7426001
file name : Image_08112023162814883.png
|
2023-11-08 16:28:15.234745 |
310 |
56771932 |
CONSTRUCTION OF PCC ROAD AT DHENGAKEND SANTAL PARA |
49500 |
CONSTRUCTION OF PCC ROAD AT DHENGAKEND SANTAL PARA1 |
Roof laid |
-
latitude : 23.2026858,23.2026858
Longitude : 86.7425982,86.7425982
file name : Image_09112023101119754.png
|
2023-11-09 10:11:19.912239 |
311 |
56771932 |
CONSTRUCTION OF PCC ROAD AT DHENGAKEND SANTAL PARA |
49500 |
CONSTRUCTION OF PCC ROAD AT DHENGAKEND SANTAL PARA1 |
Plinth level |
-
latitude : 23.2026858,23.2026858
Longitude : 86.7425982,86.7425982
file name : Image_09112023094232974.png
|
2023-11-09 09:42:33.065552 |
312 |
56771932 |
CONSTRUCTION OF PCC ROAD AT DHENGAKEND SANTAL PARA |
49500 |
CONSTRUCTION OF PCC ROAD AT DHENGAKEND SANTAL PARA1 |
Completion of work |
-
latitude : 23.2308545,23.2308545
Longitude : 86.7517461,86.7517461
file name : Image_08112023152752756.png
|
2023-11-08 15:27:53.027583 |
313 |
67726101 |
Water Supply to villages |
99000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 23.2026858
Longitude : 86.7425982
file name : Image_09112023093958054.png
|
2023-11-09 09:39:58.137153 |
314 |
67726101 |
Water Supply to villages |
99000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 23.2026858
Longitude : 86.7425982
file name : Image_09112023092601664.png
|
2023-11-09 09:26:01.749675 |
315 |
67726101 |
Water Supply to villages |
99000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 23.2308545
Longitude : 86.7517461
file name : Image_08112023152625292.png
|
2023-11-08 15:26:25.53961 |
316 |
56735749 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT RAIDIH |
49500 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT RAIDIH2 |
Roof laid |
-
latitude : 23.2026858
Longitude : 86.7425982
file name : Image_09112023091133454.png
|
2023-11-09 09:11:33.553447 |
317 |
56735749 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT RAIDIH |
49500 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT RAIDIH2 |
Roof laid |
-
latitude : 23.2026858
Longitude : 86.7425982
file name : Image_09112023091046436.png
|
2023-11-09 09:10:46.539184 |
318 |
56735749 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT RAIDIH |
49500 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT RAIDIH2 |
Plinth level |
-
latitude : 23.23027021
Longitude : 86.751751
file name : Image_08112023142320087.png
|
2023-11-08 14:23:20.23013 |
319 |
56735749 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT RAIDIH |
49500 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT RAIDIH2 |
Completion of work |
-
latitude : 23.2308542
Longitude : 86.7517473
file name : Image_08112023141234248.png
|
2023-11-08 14:12:34.354107 |
320 |
67702518 |
Electricity connection /Installation of Solar Energy |
24750 |
Electricity connection /Installation of Solar Energy1 |
Roof laid |
-
latitude : 23.23247808
Longitude : 86.73833412
file name : Image_10112023085739203.png
|
2023-11-10 08:57:39.296589 |
321 |
67702518 |
Electricity connection /Installation of Solar Energy |
24750 |
Electricity connection /Installation of Solar Energy1 |
Plinth level |
-
latitude : 23.2026858
Longitude : 86.7425982
file name : Image_09112023101302291.png
|
2023-11-09 10:13:02.491258 |
322 |
67702518 |
Electricity connection /Installation of Solar Energy |
24750 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 23.2026858
Longitude : 86.7425982
file name : Image_09112023085507858.png
|
2023-11-09 08:55:07.951266 |
323 |
56842353 |
CONSTRUCTION OF PCC ROAD FROM JOLODHAR TO DHOBABANDH |
99000 |
CONSTRUCTION OF PCC ROAD FROM JOLODHAR TO DHOBABANDH1 |
Roof laid |
-
latitude : 23.2026874,23.2026874
Longitude : 86.7426015,86.7426015
file name : Image_10112023081943227.png
|
2023-11-10 08:19:43.343364 |
324 |
56842353 |
CONSTRUCTION OF PCC ROAD FROM JOLODHAR TO DHOBABANDH |
99000 |
CONSTRUCTION OF PCC ROAD FROM JOLODHAR TO DHOBABANDH1 |
Plinth level |
-
latitude : 23.2026858,23.2026858
Longitude : 86.7425982,86.7425982
file name : Image_09112023084016630.png
|
2023-11-09 08:40:16.942067 |
325 |
56842353 |
CONSTRUCTION OF PCC ROAD FROM JOLODHAR TO DHOBABANDH |
99000 |
CONSTRUCTION OF PCC ROAD FROM JOLODHAR TO DHOBABANDH1 |
Completion of work |
-
latitude : 23.2026858,23.2026858
Longitude : 86.7425982,86.7425982
file name : Image_09112023083412168.png
|
2023-11-09 08:34:12.253547 |
326 |
56777165 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT BHAGABANDH |
49500 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT BHAGABANDH1 |
Roof laid |
-
latitude : 23.188180923461914
Longitude : 86.7429428100586
file name : Image_10112023124213488.png
|
2023-11-10 12:42:13.727723 |
327 |
56777165 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT BHAGABANDH |
49500 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT BHAGABANDH1 |
Plinth level |
-
latitude : 23.188180923461914
Longitude : 86.7429428100586
file name : Image_10112023123628554.png
|
2023-11-10 12:36:28.673377 |
328 |
56777165 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT BHAGABANDH |
49500 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT BHAGABANDH1 |
Completion of work |
-
latitude : 23.188180923461914
Longitude : 86.7429428100586
file name : Image_10112023122847295.png
|
2023-11-10 12:28:47.384732 |
329 |
56777165 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT BHAGABANDH |
49500 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT BHAGABANDH2 |
Roof laid |
-
latitude : 23.188180923461914
Longitude : 86.7429428100586
file name : Image_10112023124221292.png
|
2023-11-10 12:42:21.400846 |
330 |
56777165 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT BHAGABANDH |
49500 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT BHAGABANDH2 |
Roof laid |
-
latitude : 23.188180923461914
Longitude : 86.7429428100586
file name : Image_10112023124217606.png
|
2023-11-10 12:42:17.765331 |
331 |
56777165 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT BHAGABANDH |
49500 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT BHAGABANDH2 |
Plinth level |
-
latitude : 23.188180923461914
Longitude : 86.7429428100586
file name : Image_10112023123641504.png
|
2023-11-10 12:36:41.597466 |
332 |
56777165 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT BHAGABANDH |
49500 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT BHAGABANDH2 |
Completion of work |
-
latitude : 23.188180923461914
Longitude : 86.7429428100586
file name : Image_10112023122857302.png
|
2023-11-10 12:28:57.391154 |
333 |
56777165 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT BHAGABANDH |
49500 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT BHAGABANDH2 |
Plinth level |
-
latitude : 23.188180923461914
Longitude : 86.7429428100586
file name : Image_10112023123634584.png
|
2023-11-10 12:36:34.707396 |
334 |
56777165 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT BHAGABANDH |
49500 |
INSTALLATION OF 02 NOS SOLAR LIGHT AT BHAGABANDH2 |
Completion of work |
-
latitude : 23.188180923461914
Longitude : 86.7429428100586
file name : Image_10112023122852610.png
|
2023-11-10 12:28:52.698493 |
335 |
56843017 |
CONSTRUCTION OF PCC ROAD BRIDGEGORA TO TALTOLA MAHULDANGA |
99000 |
CONSTRUCTION OF PCC ROAD BRIDGEGORA TO TALTOLA MAHULDANGA1 |
Roof laid |
-
latitude : 23.172985076904297,23.172985076904297
Longitude : 86.74787139892578,86.74787139892578
file name : Image_16112023110104122.png
|
2023-11-16 11:01:04.240126 |
336 |
56843017 |
CONSTRUCTION OF PCC ROAD BRIDGEGORA TO TALTOLA MAHULDANGA |
99000 |
CONSTRUCTION OF PCC ROAD BRIDGEGORA TO TALTOLA MAHULDANGA1 |
Completion of work |
-
latitude : 23.17295265197754,23.17295265197754
Longitude : 86.74739837646484,86.74739837646484
file name : Image_12112023104932861.png
|
2023-11-12 10:49:32.944327 |
337 |
56843017 |
CONSTRUCTION OF PCC ROAD BRIDGEGORA TO TALTOLA MAHULDANGA |
99000 |
CONSTRUCTION OF PCC ROAD BRIDGEGORA TO TALTOLA MAHULDANGA1 |
Completion of work |
-
latitude : 23.173030853271484,23.17295265197754
Longitude : 86.74795532226562,86.74739837646484
file name : Image_12112023104431551.png
|
2023-11-12 10:44:31.631744 |
338 |
56843017 |
CONSTRUCTION OF PCC ROAD BRIDGEGORA TO TALTOLA MAHULDANGA |
99000 |
CONSTRUCTION OF PCC ROAD BRIDGEGORA TO TALTOLA MAHULDANGA1 |
Plinth level |
-
latitude : 23.17300796508789,23.17300796508789
Longitude : 86.7479019165039,86.7479019165039
file name : Image_16112023102842741.png
|
2023-11-16 10:28:42.822091 |
339 |
56843017 |
CONSTRUCTION OF PCC ROAD BRIDGEGORA TO TALTOLA MAHULDANGA |
99000 |
CONSTRUCTION OF PCC ROAD BRIDGEGORA TO TALTOLA MAHULDANGA1 |
Completion of work |
-
latitude : 23.17296600341797,23.17296600341797
Longitude : 86.74745178222656,86.74745178222656
file name : Image_16112023092503589.png
|
2023-11-16 09:25:03.679506 |
340 |
67718493 |
Creation of a new source of drinking water |
74250 |
INSTALLATION OF TUBEWELL AT KENDBANI MAJPARA |
Roof laid |
-
latitude : 23.20299530029297
Longitude : 86.7254867553711
file name : Image_16112023110552989.png
|
2023-11-16 11:05:53.094239 |
341 |
67718493 |
Creation of a new source of drinking water |
74250 |
INSTALLATION OF TUBEWELL AT KENDBANI MAJPARA |
Plinth level |
-
latitude : 23.20277214050293
Longitude : 86.72554016113281
file name : Image_16112023103057063.png
|
2023-11-16 10:30:57.143097 |
342 |
67718493 |
Creation of a new source of drinking water |
74250 |
INSTALLATION OF TUBEWELL AT KENDBANI MAJPARA |
Completion of work |
-
latitude : 23.202653884887695
Longitude : 86.72554779052734
file name : Image_16112023093458900.png
|
2023-11-16 09:34:58.995794 |
343 |
96577009 |
Creation of a new source of drinking water |
96030 |
INSTALLATION OF TUBEWELL AT MAHULADANGA |
Roof laid |
-
latitude : 23.17037582397461
Longitude : 86.74711608886719
file name : Image_29022024134316619.png
|
2024-02-29 13:43:16.699569 |
344 |
96577009 |
Creation of a new source of drinking water |
96030 |
INSTALLATION OF TUBEWELL AT MAHULADANGA |
Plinth level |
-
latitude : 23.17037582397461
Longitude : 86.74711608886719
file name : Image_29022024134115142.png
|
2024-02-29 13:41:15.21721 |
345 |
96577009 |
Creation of a new source of drinking water |
96030 |
INSTALLATION OF TUBEWELL AT MAHULADANGA |
Completion of work |
-
latitude : 23.17037582397461
Longitude : 86.74711608886719
file name : Image_29022024133915493.png
|
2024-02-29 13:39:15.585013 |
346 |
96577009 |
Creation of a new source of drinking water |
96030 |
INSTALLATION OF TUBEWELL AT MAHULADANGA |
Completion of work |
-
latitude : 23.17037582397461
Longitude : 86.74711608886719
file name : Image_29022024133826879.png
|
2024-02-29 13:38:26.973912 |
347 |
95116425 |
Construction of roads |
99000 |
pcc road haripada |
Roof laid |
-
latitude : 23.225229263305664,23.225229263305664
Longitude : 86.7553939819336,86.7553939819336
file name : Image_29022024132053941.png
|
2024-02-29 13:20:54.020464 |
348 |
95116425 |
Construction of roads |
99000 |
pcc road haripada |
Plinth level |
-
latitude : 23.225229263305664,23.225229263305664
Longitude : 86.7553939819336,86.7553939819336
file name : Image_29022024131712371.png
|
2024-02-29 13:17:12.452913 |
349 |
95116425 |
Construction of roads |
99000 |
pcc road haripada |
Completion of work |
-
latitude : 23.225229263305664,23.225229263305664
Longitude : 86.7553939819336,86.7553939819336
file name : Image_29022024131520979.png
|
2024-02-29 13:15:21.062086 |
350 |
67716728 |
Construction of Building |
99000 |
CONSTRUCTION OF SHED NEAR COMMUNITY HALL AT SIMAKANALI |
Roof laid |
-
latitude : 23.18128204345703
Longitude : 86.7585678100586
file name : Image_14012024153429259.png
|
2024-01-14 15:34:29.351785 |
351 |
67716728 |
Construction of Building |
99000 |
CONSTRUCTION OF SHED NEAR COMMUNITY HALL AT SIMAKANALI |
Plinth level |
-
latitude : 23.18128204345703
Longitude : 86.7585678100586
file name : Image_14012024153158340.png
|
2024-01-14 15:31:58.412759 |
352 |
67716728 |
Construction of Building |
99000 |
CONSTRUCTION OF SHED NEAR COMMUNITY HALL AT SIMAKANALI |
Completion of work |
-
latitude : 23.18128204345703
Longitude : 86.7585678100586
file name : Image_14012024152919312.png
|
2024-01-14 15:29:19.389692 |
353 |
56773062 |
CONSTRUCTION OF PCC ROAD AT LAHARIA NAMO PARA |
99000 |
CONSTRUCTION OF PCC ROAD AT LAHARIA NAMO PARA1 |
Roof laid |
-
latitude : 23.195329666137695,23.195329666137695
Longitude : 86.74208068847656,86.74208068847656
file name : Image_15012024150401323.png
|
2024-01-15 15:04:01.419807 |
354 |
56773062 |
CONSTRUCTION OF PCC ROAD AT LAHARIA NAMO PARA |
99000 |
CONSTRUCTION OF PCC ROAD AT LAHARIA NAMO PARA1 |
Plinth level |
-
latitude : 23.195329666137695,23.195329666137695
Longitude : 86.74208068847656,86.74208068847656
file name : Image_15012024150152788.png
|
2024-01-15 15:01:52.8802 |
355 |
56773062 |
CONSTRUCTION OF PCC ROAD AT LAHARIA NAMO PARA |
99000 |
CONSTRUCTION OF PCC ROAD AT LAHARIA NAMO PARA1 |
Completion of work |
-
latitude : 23.195329666137695,23.195329666137695
Longitude : 86.74208068847656,86.74208068847656
file name : Image_15012024145628670.png
|
2024-01-15 14:56:28.751112 |
356 |
67715272 |
Construction of community washing & bathing complex |
140000 |
CONSTRUCTION OF BATHING GHAT AT PATHAK BANDH |
Roof laid |
-
latitude : 23.22804832458496
Longitude : 86.7540283203125
file name : Image_27012024150028957.png
|
2024-01-27 15:00:29.061074 |
357 |
67715272 |
Construction of community washing & bathing complex |
140000 |
CONSTRUCTION OF BATHING GHAT AT PATHAK BANDH |
Plinth level |
-
latitude : 23.22804832458496
Longitude : 86.7540283203125
file name : Image_27012024145658141.png
|
2024-01-27 14:56:58.218309 |
358 |
67715272 |
Construction of community washing & bathing complex |
140000 |
CONSTRUCTION OF BATHING GHAT AT PATHAK BANDH |
Completion of work |
-
latitude : 23.22804832458496
Longitude : 86.7540283203125
file name : Image_27012024145343420.png
|
2024-01-27 14:53:43.508244 |
359 |
67710345 |
Construction of roads |
79200 |
PCC ROAD AT RAGHUNATHPUR FROM SUKDEB BASKE TO SOMNATH BASKE HOUSE |
Roof laid |
-
latitude : 23.212268829345703,23.212268829345703
Longitude : 86.7840347290039,86.7840347290039
file name : Image_16112023110225572.png
|
2023-11-16 11:02:25.72339 |
360 |
67710345 |
Construction of roads |
79200 |
PCC ROAD AT RAGHUNATHPUR FROM SUKDEB BASKE TO SOMNATH BASKE HOUSE |
Plinth level |
-
latitude : 23.212369918823242,23.212369918823242
Longitude : 86.7837905883789,86.7837905883789
file name : Image_16112023102102923.png
|
2023-11-16 10:21:02.997354 |
361 |
67710345 |
Construction of roads |
79200 |
PCC ROAD AT RAGHUNATHPUR FROM SUKDEB BASKE TO SOMNATH BASKE HOUSE |
Completion of work |
-
latitude : 23.212369918823242,23.212369918823242
Longitude : 86.7837905883789,86.7837905883789
file name : Image_16112023094253291.png
|
2023-11-16 09:42:53.369987 |
362 |
56738635 |
CONSTRUCTION OF PCC VILLAGE ROAD AT SIMAKANALI |
99000 |
CONSTRUCTION OF PCC VILLAGE ROAD AT SIMAKANALI1 |
Roof laid |
-
latitude : 23.1795711517334,23.1795711517334
Longitude : 86.75677490234375,86.75677490234375
file name : Image_16112023105759412.png
|
2023-11-16 10:57:59.51126 |
363 |
56738635 |
CONSTRUCTION OF PCC VILLAGE ROAD AT SIMAKANALI |
99000 |
CONSTRUCTION OF PCC VILLAGE ROAD AT SIMAKANALI1 |
Plinth level |
-
latitude : 23.212369918823242,23.212369918823242
Longitude : 86.7837905883789,86.7837905883789
file name : Image_16112023102236504.png
|
2023-11-16 10:22:36.579746 |
364 |
56738635 |
CONSTRUCTION OF PCC VILLAGE ROAD AT SIMAKANALI |
99000 |
CONSTRUCTION OF PCC VILLAGE ROAD AT SIMAKANALI1 |
Plinth level |
-
latitude : 23.1795711517334,23.1795711517334
Longitude : 86.75677490234375,86.75677490234375
file name : Image_16112023103957868.png
|
2023-11-16 10:39:57.949951 |
365 |
56738635 |
CONSTRUCTION OF PCC VILLAGE ROAD AT SIMAKANALI |
99000 |
CONSTRUCTION OF PCC VILLAGE ROAD AT SIMAKANALI1 |
Completion of work |
-
latitude : 23.17295265197754,23.17295265197754
Longitude : 86.74739837646484,86.74739837646484
file name : Image_12112023104602356.png
|
2023-11-12 10:46:02.436221 |
366 |
35112386 |
PURCHASE OF TUBEWELL PARTS |
277200 |
PURCHASE OF TUBEWELL PARTS1 |
Plinth level |
-
latitude : 23.2027845
Longitude : 86.7426
file name : Image_17092021141923187.png
|
2021-09-17 14:19:23.265094 |
367 |
56772640 |
CONSTRUCTION OF BATHING GHAT AT SCHOOL BANDH AT ARALI |
99000 |
CONSTRUCTION OF BATHING GHAT AT SCHOOL BANDH AT ARALI1 |
Roof laid |
-
latitude : 23.212757110595703
Longitude : 86.7706069946289
file name : Image_23112023155513847.png
|
2023-11-23 15:55:13.928011 |
368 |
56772640 |
CONSTRUCTION OF BATHING GHAT AT SCHOOL BANDH AT ARALI |
99000 |
CONSTRUCTION OF BATHING GHAT AT SCHOOL BANDH AT ARALI1 |
Plinth level |
-
latitude : 23.212757110595703
Longitude : 86.7706069946289
file name : Image_23112023155147115.png
|
2023-11-23 15:51:47.192551 |
369 |
56772640 |
CONSTRUCTION OF BATHING GHAT AT SCHOOL BANDH AT ARALI |
99000 |
CONSTRUCTION OF BATHING GHAT AT SCHOOL BANDH AT ARALI1 |
Completion of work |
-
latitude : 23.212757110595703
Longitude : 86.7706069946289
file name : Image_23112023154817594.png
|
2023-11-23 15:48:17.676158 |
370 |
67726342 |
Water Supply to villages |
74250 |
INSTALLATION OF TUBEWELL AT ARALI GRAMTHAN |
Roof laid |
-
latitude : 23.206340789794922
Longitude : 86.76485443115234
file name : Image_23112023164831398.png
|
2023-11-23 16:48:31.475255 |
371 |
67726342 |
Water Supply to villages |
74250 |
INSTALLATION OF TUBEWELL AT ARALI GRAMTHAN |
Plinth level |
-
latitude : 23.206340789794922
Longitude : 86.76485443115234
file name : Image_23112023164651045.png
|
2023-11-23 16:46:51.123292 |
372 |
67726342 |
Water Supply to villages |
74250 |
INSTALLATION OF TUBEWELL AT ARALI GRAMTHAN |
Completion of work |
-
latitude : 23.206340789794922
Longitude : 86.76485443115234
file name : Image_23112023164439256.png
|
2023-11-23 16:44:39.335076 |
373 |
56771651 |
CONSTRUCTION OF PCC ROAD BANDIH JORTAL AT ARALI |
99000 |
CONSTRUCTION OF PCC ROAD BANDIH JORTAL AT ARALI1 |
Roof laid |
-
latitude : 23.202350616455078,23.202350616455078
Longitude : 86.75777435302734,86.75777435302734
file name : Image_24112023170637895.png
|
2023-11-24 17:06:37.97281 |
374 |
56771651 |
CONSTRUCTION OF PCC ROAD BANDIH JORTAL AT ARALI |
99000 |
CONSTRUCTION OF PCC ROAD BANDIH JORTAL AT ARALI1 |
Plinth level |
-
latitude : 23.202350616455078,23.202350616455078
Longitude : 86.75777435302734,86.75777435302734
file name : Image_24112023170445288.png
|
2023-11-24 17:04:45.368602 |
375 |
56771651 |
CONSTRUCTION OF PCC ROAD BANDIH JORTAL AT ARALI |
99000 |
CONSTRUCTION OF PCC ROAD BANDIH JORTAL AT ARALI1 |
Completion of work |
-
latitude : 23.202350616455078,23.202350616455078
Longitude : 86.75777435302734,86.75777435302734
file name : Image_24112023170105878.png
|
2023-11-24 17:01:05.985675 |
376 |
56737350 |
CONSTRUCTION OF DRAIN PORADIH |
99000 |
CONSTRUCTION OF DRAIN PORADIH1 |
Roof laid |
-
latitude : 23.187597274780273,23.187597274780273
Longitude : 86.75244903564453,86.75244903564453
file name : Image_22112023161530979.png
|
2023-11-22 16:15:31.059808 |
377 |
56737350 |
CONSTRUCTION OF DRAIN PORADIH |
99000 |
CONSTRUCTION OF DRAIN PORADIH1 |
Plinth level |
-
latitude : 23.187597274780273,23.187597274780273
Longitude : 86.75244903564453,86.75244903564453
file name : Image_22112023160045713.png
|
2023-11-22 16:00:45.787768 |
378 |
56737350 |
CONSTRUCTION OF DRAIN PORADIH |
99000 |
CONSTRUCTION OF DRAIN PORADIH1 |
Completion of work |
-
latitude : 23.187597274780273,23.187597274780273
Longitude : 86.75244903564453,86.75244903564453
file name : Image_22112023155825646.png
|
2023-11-22 15:58:25.727062 |
379 |
56773615 |
CONSTRUCTION OF BATHING GHAT AT JAMUNA BANDH AT CHANDANPUR |
59400 |
CONSTRUCTION OF BATHING GHAT AT JAMUNA BANDH AT CHANDANPUR1 |
Roof laid |
-
latitude : 23.220823287963867
Longitude : 86.74773406982422
file name : Image_23112023135841889.png
|
2023-11-23 13:58:41.964845 |
380 |
56773615 |
CONSTRUCTION OF BATHING GHAT AT JAMUNA BANDH AT CHANDANPUR |
59400 |
CONSTRUCTION OF BATHING GHAT AT JAMUNA BANDH AT CHANDANPUR1 |
Plinth level |
-
latitude : 23.220823287963867
Longitude : 86.74773406982422
file name : Image_23112023135650915.png
|
2023-11-23 13:56:50.99695 |
381 |
56773615 |
CONSTRUCTION OF BATHING GHAT AT JAMUNA BANDH AT CHANDANPUR |
59400 |
CONSTRUCTION OF BATHING GHAT AT JAMUNA BANDH AT CHANDANPUR1 |
Completion of work |
-
latitude : 23.220823287963867
Longitude : 86.74773406982422
file name : Image_23112023125516230.png
|
2023-11-23 12:55:16.313101 |
382 |
67725867 |
Water Supply to villages |
74250 |
INSTALLATION OF TUBEWELL AT ARALI BANDHDIH |
Roof laid |
-
latitude : 23.202350616455078
Longitude : 86.75777435302734
file name : Image_24112023165555650.png
|
2023-11-24 16:55:55.738297 |
383 |
67725867 |
Water Supply to villages |
74250 |
INSTALLATION OF TUBEWELL AT ARALI BANDHDIH |
Plinth level |
-
latitude : 23.202350616455078
Longitude : 86.75777435302734
file name : Image_24112023165408787.png
|
2023-11-24 16:54:08.887103 |
384 |
67725867 |
Water Supply to villages |
74250 |
INSTALLATION OF TUBEWELL AT ARALI BANDHDIH |
Completion of work |
-
latitude : 23.202350616455078
Longitude : 86.75777435302734
file name : Image_24112023165115417.png
|
2023-11-24 16:51:15.495969 |
385 |
56731100 |
CONSTRUCTION OF DRAIN AT ALGOMIR |
49500 |
CONSTRUCTION OF DRAIN AT ALGOMIR1 |
Roof laid |
-
latitude : 23.209333419799805,23.209333419799805
Longitude : 86.73997497558594,86.73997497558594
file name : Image_22112023155450866.png
|
2023-11-22 15:54:50.947365 |
386 |
56731100 |
CONSTRUCTION OF DRAIN AT ALGOMIR |
49500 |
CONSTRUCTION OF DRAIN AT ALGOMIR1 |
Plinth level |
-
latitude : 23.209333419799805,23.209333419799805
Longitude : 86.73997497558594,86.73997497558594
file name : Image_22112023155123706.png
|
2023-11-22 15:51:23.789378 |
387 |
56731100 |
CONSTRUCTION OF DRAIN AT ALGOMIR |
49500 |
CONSTRUCTION OF DRAIN AT ALGOMIR1 |
Completion of work |
-
latitude : 23.209333419799805,23.209333419799805
Longitude : 86.73997497558594,86.73997497558594
file name : Image_22112023154936782.png
|
2023-11-22 15:49:36.865204 |
388 |
67713010 |
Construction of community washing & bathing complex |
59400 |
CONSTRUCTION OF BATHING GHAT AT DUMDAGHUTU BANDH AT RAGHUNATHPUR |
Roof laid |
-
latitude : 23.209369659423828
Longitude : 86.78462982177734
file name : Image_22112023150152113.png
|
2023-11-22 15:01:52.197844 |
389 |
67713010 |
Construction of community washing & bathing complex |
59400 |
CONSTRUCTION OF BATHING GHAT AT DUMDAGHUTU BANDH AT RAGHUNATHPUR |
Plinth level |
-
latitude : 23.209369659423828
Longitude : 86.78462982177734
file name : Image_22112023150008663.png
|
2023-11-22 15:00:08.748879 |
390 |
67713010 |
Construction of community washing & bathing complex |
59400 |
CONSTRUCTION OF BATHING GHAT AT DUMDAGHUTU BANDH AT RAGHUNATHPUR |
Completion of work |
-
latitude : 23.209369659423828
Longitude : 86.78462982177734
file name : Image_22112023145711540.png
|
2023-11-22 14:57:11.623968 |
391 |
67705216 |
Creation of a new source of drinking water |
74250 |
INSTALLATION OF TUBEWELL AT BANABIR UNDER GHOLKURD SANSAD |
Roof laid |
-
latitude : 23.222169876098633
Longitude : 86.71891784667969
file name : Image_23112023165341700.png
|
2023-11-23 16:53:41.777745 |
392 |
67705216 |
Creation of a new source of drinking water |
74250 |
INSTALLATION OF TUBEWELL AT BANABIR UNDER GHOLKURD SANSAD |
Plinth level |
-
latitude : 23.222169876098633
Longitude : 86.71891784667969
file name : Image_23112023165102300.png
|
2023-11-23 16:51:02.382409 |
393 |
67705216 |
Creation of a new source of drinking water |
74250 |
INSTALLATION OF TUBEWELL AT BANABIR UNDER GHOLKURD SANSAD |
Completion of work |
-
latitude : 23.222145080566406
Longitude : 86.71898651123047
file name : Image_23112023164435235.png
|
2023-11-23 16:44:35.309619 |
394 |
56734888 |
INSTALLATION OF TUBEWELL AT UPARKULI SARDAR PARA AT PARUDA |
74250 |
INSTALLATION OF TUBEWELL AT UPARKULI SARDAR PARA AT PARUDA1 |
Roof laid |
-
latitude : 23.23859214782715
Longitude : 86.75291442871094
file name : Image_22112023154305825.png
|
2023-11-22 15:43:05.901985 |
395 |
56734888 |
INSTALLATION OF TUBEWELL AT UPARKULI SARDAR PARA AT PARUDA |
74250 |
INSTALLATION OF TUBEWELL AT UPARKULI SARDAR PARA AT PARUDA1 |
Plinth level |
-
latitude : 23.23859214782715
Longitude : 86.75291442871094
file name : Image_22112023152622561.png
|
2023-11-22 15:26:22.643911 |
396 |
56734888 |
INSTALLATION OF TUBEWELL AT UPARKULI SARDAR PARA AT PARUDA |
74250 |
INSTALLATION OF TUBEWELL AT UPARKULI SARDAR PARA AT PARUDA1 |
Plinth level |
-
latitude : 23.23859214782715
Longitude : 86.75291442871094
file name : Image_22112023152527442.png
|
2023-11-22 15:25:27.524076 |
397 |
56734888 |
INSTALLATION OF TUBEWELL AT UPARKULI SARDAR PARA AT PARUDA |
74250 |
INSTALLATION OF TUBEWELL AT UPARKULI SARDAR PARA AT PARUDA1 |
Completion of work |
-
latitude : 23.23859214782715
Longitude : 86.75291442871094
file name : Image_22112023152324696.png
|
2023-11-22 15:23:24.779471 |
398 |
67711972 |
Water Supply to villages |
69300 |
tube well raghunathpur patar para samsan ghat |
Roof laid |
-
latitude : 23.20844841003418
Longitude : 86.78504180908203
file name : Image_06022024154651855.png
|
2024-02-06 15:46:51.951575 |
399 |
67711972 |
Water Supply to villages |
69300 |
tube well raghunathpur patar para samsan ghat |
Plinth level |
-
latitude : 23.20844841003418
Longitude : 86.78504180908203
file name : Image_06022024154446446.png
|
2024-02-06 15:44:46.553224 |
400 |
67711972 |
Water Supply to villages |
69300 |
tube well raghunathpur patar para samsan ghat |
Completion of work |
-
latitude : 23.20844841003418
Longitude : 86.78504180908203
file name : Image_06022024154210830.png
|
2024-02-06 15:42:11.021292 |
401 |
56776212 |
CONSTRUCTION OF BOUNDARY WALL AT LAGADANG |
74250 |
CONSTRUCTION OF BOUNDARY WALL AT LAGADANG1 |
Roof laid |
-
latitude : 23.22945785522461
Longitude : 86.7541732788086
file name : Image_04122023150452975.png
|
2023-12-04 15:04:53.911838 |
402 |
56776212 |
CONSTRUCTION OF BOUNDARY WALL AT LAGADANG |
74250 |
CONSTRUCTION OF BOUNDARY WALL AT LAGADANG1 |
Plinth level |
-
latitude : 23.22945785522461
Longitude : 86.7541732788086
file name : Image_04122023142659160.png
|
2023-12-04 14:26:59.241815 |
403 |
56776212 |
CONSTRUCTION OF BOUNDARY WALL AT LAGADANG |
74250 |
CONSTRUCTION OF BOUNDARY WALL AT LAGADANG1 |
Completion of work |
-
latitude : 23.22945785522461
Longitude : 86.7541732788086
file name : Image_04122023141835350.png
|
2023-12-04 14:18:35.438819 |
404 |
67749680 |
Drainage Construction |
99000 |
Construction of Drain at Poradih Sansad |
Roof laid |
-
latitude : 23.1878604888916
Longitude : 86.75254821777344
file name : Image_04122023141145879.png
|
2023-12-04 14:11:45.953516 |
405 |
67749680 |
Drainage Construction |
99000 |
Construction of Drain at Poradih Sansad |
Plinth level |
-
latitude : 23.1878604888916
Longitude : 86.75254821777344
file name : Image_04122023140938234.png
|
2023-12-04 14:09:38.316594 |
406 |
67749680 |
Drainage Construction |
99000 |
Construction of Drain at Poradih Sansad |
Completion of work |
-
latitude : 23.1878604888916
Longitude : 86.75254821777344
file name : Image_04122023135515803.png
|
2023-12-04 13:55:15.882082 |
407 |
67714472 |
Construction of roads |
59400 |
CONSTRUCTION OF PCC ROAD FROM PATHAK GOLI GOSTI MELA |
Roof laid |
-
latitude : 23.229515075683594,23.229515075683594
Longitude : 86.75350952148438,86.75350952148438
file name : Image_06122023075628394.png
|
2023-12-06 07:56:28.474808 |
408 |
67714472 |
Construction of roads |
59400 |
CONSTRUCTION OF PCC ROAD FROM PATHAK GOLI GOSTI MELA |
Plinth level |
-
latitude : 23.229515075683594,23.229515075683594
Longitude : 86.75350952148438,86.75350952148438
file name : Image_06122023074901777.png
|
2023-12-06 07:49:01.857179 |
409 |
67714472 |
Construction of roads |
59400 |
CONSTRUCTION OF PCC ROAD FROM PATHAK GOLI GOSTI MELA |
Completion of work |
-
latitude : 23.229515075683594,23.229515075683594
Longitude : 86.75350952148438,86.75350952148438
file name : Image_06122023074226545.png
|
2023-12-06 07:42:26.669949 |
410 |
67729480 |
Water Supply to villages |
74250 |
INSTALLATION OF TUBEWELL AT CHHIRUDIH IV |
Roof laid |
-
latitude : 23.229536056518555
Longitude : 86.75350952148438
file name : Image_04122023160937457.png
|
2023-12-04 16:09:37.555742 |
411 |
67729480 |
Water Supply to villages |
74250 |
INSTALLATION OF TUBEWELL AT CHHIRUDIH IV |
Plinth level |
-
latitude : 23.229536056518555
Longitude : 86.75350952148438
file name : Image_04122023160610348.png
|
2023-12-04 16:06:10.541212 |
412 |
67729480 |
Water Supply to villages |
74250 |
INSTALLATION OF TUBEWELL AT CHHIRUDIH IV |
Completion of work |
-
latitude : 23.229536056518555
Longitude : 86.75350952148438
file name : Image_04122023160220451.png
|
2023-12-04 16:02:20.55327 |
413 |
47298751 |
PCC ROAD FROM BOLPUKUR TO SAMSAN GHAT AT DEBGRAM SANSAD |
143907 |
PCC ROAD FROM BOLPUKUR TO SAMSAN GHAT AT DEBGRAM SANSAD1 |
Roof laid |
-
latitude : 23.17460823059082,23.17460823059082
Longitude : 86.7461166381836,86.7461166381836
file name : Image_06122023182606514.png
|
2023-12-06 18:26:06.600639 |
414 |
47298751 |
PCC ROAD FROM BOLPUKUR TO SAMSAN GHAT AT DEBGRAM SANSAD |
143907 |
PCC ROAD FROM BOLPUKUR TO SAMSAN GHAT AT DEBGRAM SANSAD1 |
Plinth level |
-
latitude : 23.17460823059082,23.17460823059082
Longitude : 86.7461166381836,86.7461166381836
file name : Image_06122023182352059.png
|
2023-12-06 18:23:52.144288 |
415 |
47298751 |
PCC ROAD FROM BOLPUKUR TO SAMSAN GHAT AT DEBGRAM SANSAD |
143907 |
PCC ROAD FROM BOLPUKUR TO SAMSAN GHAT AT DEBGRAM SANSAD1 |
Completion of work |
-
latitude : 23.17460823059082,23.17460823059082
Longitude : 86.7461166381836,86.7461166381836
file name : Image_06122023182029074.png
|
2023-12-06 18:20:29.210461 |
416 |
67729735 |
Drainage Construction |
74250 |
CONSTRUCTION OF DRAIN AT BOLTOL CHHIRUDIH IV |
Roof laid |
-
latitude : 23.2287654876709
Longitude : 86.75686645507812
file name : Image_06122023181230839.png
|
2023-12-06 18:12:30.927902 |
417 |
67729735 |
Drainage Construction |
74250 |
CONSTRUCTION OF DRAIN AT BOLTOL CHHIRUDIH IV |
Plinth level |
-
latitude : 23.2287654876709
Longitude : 86.75686645507812
file name : Image_06122023180853094.png
|
2023-12-06 18:08:53.183806 |
418 |
67729735 |
Drainage Construction |
74250 |
CONSTRUCTION OF DRAIN AT BOLTOL CHHIRUDIH IV |
Completion of work |
-
latitude : 23.2287654876709
Longitude : 86.75686645507812
file name : Image_06122023175647300.png
|
2023-12-06 17:56:47.384812 |
419 |
67726744 |
Construction of community washing & bathing complex |
74250 |
Construction of bathing ghat at arali |
Roof laid |
-
latitude : 23.208118438720703
Longitude : 86.75743103027344
file name : Image_17022024111541993.png
|
2024-02-17 11:15:42.093138 |
420 |
67726744 |
Construction of community washing & bathing complex |
74250 |
Construction of bathing ghat at arali |
Plinth level |
-
latitude : 23.208118438720703
Longitude : 86.75743103027344
file name : Image_17022024111322504.png
|
2024-02-17 11:13:22.603878 |
421 |
67726744 |
Construction of community washing & bathing complex |
74250 |
Construction of bathing ghat at arali |
Completion of work |
-
latitude : 23.208118438720703
Longitude : 86.75743103027344
file name : Image_17022024110852804.png
|
2024-02-17 11:08:52.919055 |
422 |
56737797 |
CONSTRUCTION OF BATHING GHAT AT LAYABDI BANDH AT SIMAKANALI |
74250 |
CONSTRUCTION OF BATHING GHAT AT LAYABDI BANDH AT SIMAKANALI1 |
Roof laid |
-
latitude : 23.182336807250977
Longitude : 86.75556945800781
file name : Image_15122023152239788.png
|
2023-12-15 15:22:39.869877 |
423 |
56737797 |
CONSTRUCTION OF BATHING GHAT AT LAYABDI BANDH AT SIMAKANALI |
74250 |
CONSTRUCTION OF BATHING GHAT AT LAYABDI BANDH AT SIMAKANALI1 |
Plinth level |
-
latitude : 23.182336807250977
Longitude : 86.75556945800781
file name : Image_15122023151954408.png
|
2023-12-15 15:19:54.492337 |
424 |
56737797 |
CONSTRUCTION OF BATHING GHAT AT LAYABDI BANDH AT SIMAKANALI |
74250 |
CONSTRUCTION OF BATHING GHAT AT LAYABDI BANDH AT SIMAKANALI1 |
Completion of work |
-
latitude : 23.182336807250977
Longitude : 86.75556945800781
file name : Image_15122023151705004.png
|
2023-12-15 15:17:05.081225 |
425 |
67709022 |
Construction of roads |
99000 |
CONSTRUCTION OF PCC ROAD FROM GOUTAM PUMP TO NADIGHAT AT DEBAGRAM |
Roof laid |
-
latitude : 23.17917251586914,23.17917251586914
Longitude : 86.7449722290039,86.7449722290039
file name : Image_15122023150432104.png
|
2023-12-15 15:04:32.191236 |
426 |
67709022 |
Construction of roads |
99000 |
CONSTRUCTION OF PCC ROAD FROM GOUTAM PUMP TO NADIGHAT AT DEBAGRAM |
Plinth level |
-
latitude : 23.17917251586914,23.17917251586914
Longitude : 86.7449722290039,86.7449722290039
file name : Image_15122023150218834.png
|
2023-12-15 15:02:18.923955 |
427 |
67709022 |
Construction of roads |
99000 |
CONSTRUCTION OF PCC ROAD FROM GOUTAM PUMP TO NADIGHAT AT DEBAGRAM |
Completion of work |
-
latitude : 23.17917251586914,23.17917251586914
Longitude : 86.7449722290039,86.7449722290039
file name : Image_15122023150019387.png
|
2023-12-15 15:00:19.464781 |
428 |
90352369 |
PCC ROAD NEAR DURGA MANDIR AT PORADIH I SANSAD |
99000 |
PCC ROAD NEAR DURGA MANDIR AT PORADIH I SANSAD1 |
Roof laid |
-
latitude : 23.18735122680664,23.18735122680664
Longitude : 86.75105285644531,86.75105285644531
file name : Image_20022024151853428.png
|
2024-02-20 15:18:53.508039 |
429 |
90352369 |
PCC ROAD NEAR DURGA MANDIR AT PORADIH I SANSAD |
99000 |
PCC ROAD NEAR DURGA MANDIR AT PORADIH I SANSAD1 |
Plinth level |
-
latitude : 23.18735122680664,23.18735122680664
Longitude : 86.75105285644531,86.75105285644531
file name : Image_20022024151652836.png
|
2024-02-20 15:16:52.927692 |
430 |
90352369 |
PCC ROAD NEAR DURGA MANDIR AT PORADIH I SANSAD |
99000 |
PCC ROAD NEAR DURGA MANDIR AT PORADIH I SANSAD1 |
Completion of work |
-
latitude : 23.2027908,23.2027908
Longitude : 86.7425871,86.7425871
file name : Image_20022024142719141.png
|
2024-02-20 14:27:19.245605 |
431 |
90352654 |
PCC ROAD SIMAKANALI KALI MANDIR |
99000 |
PCC ROAD SIMAKANALI KALI MANDIR1 |
Roof laid |
-
latitude : 23.18328285217285,23.18328285217285
Longitude : 86.7561264038086,86.7561264038086
file name : Image_20022024152829450.png
|
2024-02-20 15:28:29.542453 |
432 |
90352654 |
PCC ROAD SIMAKANALI KALI MANDIR |
99000 |
PCC ROAD SIMAKANALI KALI MANDIR1 |
Plinth level |
-
latitude : 23.18328285217285,23.18328285217285
Longitude : 86.7561264038086,86.7561264038086
file name : Image_20022024152522383.png
|
2024-02-20 15:25:22.472489 |
433 |
90352654 |
PCC ROAD SIMAKANALI KALI MANDIR |
99000 |
PCC ROAD SIMAKANALI KALI MANDIR1 |
Completion of work |
-
latitude : 23.18328285217285,23.18328285217285
Longitude : 86.7561264038086,86.7561264038086
file name : Image_20022024152144068.png
|
2024-02-20 15:21:44.164546 |
434 |
67711081 |
Electricity connection /Installation of Solar Energy |
30000 |
Electricity connection /Installation of Solar Energy1 |
Roof laid |
-
latitude : 23.205677032470703
Longitude : 86.77522277832031
file name : Image_15122023154123533.png
|
2023-12-15 15:41:23.617057 |
435 |
67711081 |
Electricity connection /Installation of Solar Energy |
30000 |
Electricity connection /Installation of Solar Energy1 |
Plinth level |
-
latitude : 23.205677032470703
Longitude : 86.77522277832031
file name : Image_15122023153832902.png
|
2023-12-15 15:38:32.982865 |
436 |
67711081 |
Electricity connection /Installation of Solar Energy |
30000 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 23.205677032470703
Longitude : 86.77522277832031
file name : Image_15122023153612876.png
|
2023-12-15 15:36:12.959546 |
437 |
90351622 |
Creation of a new source of drinking water |
99000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.229158401489258
Longitude : 86.7554931640625
file name : Image_21022024162154128.png
|
2024-02-21 16:21:54.223327 |
438 |
90351622 |
Creation of a new source of drinking water |
99000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.229158401489258
Longitude : 86.7554931640625
file name : Image_21022024162009451.png
|
2024-02-21 16:20:09.550162 |
439 |
90351622 |
Creation of a new source of drinking water |
99000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.229158401489258
Longitude : 86.7554931640625
file name : Image_21022024161617938.png
|
2024-02-21 16:16:18.039693 |
440 |
90351328 |
Creation of a new source of drinking water |
98999 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.18744659423828
Longitude : 86.74764251708984
file name : Image_21022024161425170.png
|
2024-02-21 16:14:25.271159 |
441 |
90351328 |
Creation of a new source of drinking water |
98999 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.18744659423828
Longitude : 86.74764251708984
file name : Image_21022024161252641.png
|
2024-02-21 16:12:52.728544 |
442 |
90351328 |
Creation of a new source of drinking water |
98999 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.18744659423828
Longitude : 86.74764251708984
file name : Image_21022024161057081.png
|
2024-02-21 16:10:57.16775 |
443 |
56777042 |
CONSTRUCTION OF DRAIN FROM BAKULTALA TO HARIPADA DASH HOUSE |
99000 |
CONSTRUCTION OF DRAIN FROM BAKULTALA TO HARIPADA DASH HOUSE1 |
Roof laid |
-
latitude : 23.228927612304688,23.228927612304688
Longitude : 86.75654602050781,86.75654602050781
file name : Image_22122023155049339.png
|
2023-12-22 15:50:49.424582 |
444 |
56777042 |
CONSTRUCTION OF DRAIN FROM BAKULTALA TO HARIPADA DASH HOUSE |
99000 |
CONSTRUCTION OF DRAIN FROM BAKULTALA TO HARIPADA DASH HOUSE1 |
Plinth level |
-
latitude : 23.228927612304688,23.228927612304688
Longitude : 86.75654602050781,86.75654602050781
file name : Image_22122023154518589.png
|
2023-12-22 15:45:18.680106 |
445 |
56777042 |
CONSTRUCTION OF DRAIN FROM BAKULTALA TO HARIPADA DASH HOUSE |
99000 |
CONSTRUCTION OF DRAIN FROM BAKULTALA TO HARIPADA DASH HOUSE1 |
Completion of work |
-
latitude : 23.228927612304688,23.228927612304688
Longitude : 86.75654602050781,86.75654602050781
file name : Image_22122023154333977.png
|
2023-12-22 15:43:34.078351 |
446 |
56733131 |
CONSTRUCTION OF DRAIN AT PURNAGORA |
49500 |
CONSTRUCTION OF DRAIN AT PURNAGORA1 |
Roof laid |
-
latitude : 23.228927612304688,23.228927612304688
Longitude : 86.75654602050781,86.75654602050781
file name : Image_22122023160655561.png
|
2023-12-22 16:06:55.654229 |
447 |
56733131 |
CONSTRUCTION OF DRAIN AT PURNAGORA |
49500 |
CONSTRUCTION OF DRAIN AT PURNAGORA1 |
Plinth level |
-
latitude : 23.228927612304688,23.228927612304688
Longitude : 86.75654602050781,86.75654602050781
file name : Image_22122023160258375.png
|
2023-12-22 16:02:58.468595 |
448 |
56733131 |
CONSTRUCTION OF DRAIN AT PURNAGORA |
49500 |
CONSTRUCTION OF DRAIN AT PURNAGORA1 |
Completion of work |
-
latitude : 23.228927612304688,23.228927612304688
Longitude : 86.75654602050781,86.75654602050781
file name : Image_22122023155917573.png
|
2023-12-22 15:59:17.671136 |
449 |
56773368 |
CONSTRUCTION OF DRAIN FROM PRAVASH DAN TO KADAM BANDH |
99000 |
CONSTRUCTION OF DRAIN FROM PRAVASH DAN TO KADAM BANDH1 |
Roof laid |
-
latitude : 23.228927612304688,23.228927612304688
Longitude : 86.75654602050781,86.75654602050781
file name : Image_22122023170210355.png
|
2023-12-22 17:02:10.449813 |
450 |
56773368 |
CONSTRUCTION OF DRAIN FROM PRAVASH DAN TO KADAM BANDH |
99000 |
CONSTRUCTION OF DRAIN FROM PRAVASH DAN TO KADAM BANDH1 |
Plinth level |
-
latitude : 23.228927612304688,23.228927612304688
Longitude : 86.75654602050781,86.75654602050781
file name : Image_22122023165854296.png
|
2023-12-22 16:58:54.394734 |
451 |
56773368 |
CONSTRUCTION OF DRAIN FROM PRAVASH DAN TO KADAM BANDH |
99000 |
CONSTRUCTION OF DRAIN FROM PRAVASH DAN TO KADAM BANDH1 |
Completion of work |
-
latitude : 23.228927612304688,23.228927612304688
Longitude : 86.75654602050781,86.75654602050781
file name : Image_22122023165333302.png
|
2023-12-22 16:53:33.390979 |
452 |
95157273 |
Drainage Construction |
99000 |
CONSTRUCTION OF DRAIN AT LAHARIA SANSAD |
Roof laid |
-
latitude : 23.196741104125977
Longitude : 86.7385482788086
file name : Image_23042024132851784.png
|
2024-04-23 13:28:51.881735 |
453 |
95157273 |
Drainage Construction |
99000 |
CONSTRUCTION OF DRAIN AT LAHARIA SANSAD |
Plinth level |
-
latitude : 23.196741104125977
Longitude : 86.7385482788086
file name : Image_23042024132658494.png
|
2024-04-23 13:26:58.620104 |
454 |
95157273 |
Drainage Construction |
99000 |
CONSTRUCTION OF DRAIN AT LAHARIA SANSAD |
Completion of work |
-
latitude : 23.196741104125977
Longitude : 86.7385482788086
file name : Image_23042024131830374.png
|
2024-04-23 13:18:30.452291 |
455 |
97786334 |
Creation of a new source of drinking water |
250000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.22981032
Longitude : 86.73291259
file name : Image_26042024160932798.png
|
2024-04-26 16:09:32.878528 |
456 |
97786334 |
Creation of a new source of drinking water |
250000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.2027530670166
Longitude : 86.74256134033203
file name : Image_26042024155925712.png
|
2024-04-26 15:59:25.794804 |
457 |
90353185 |
Creation of drainage channel for management of grey water |
99000 |
construction of drain at raghunathpur II |
Roof laid |
-
latitude : 23.209720611572266
Longitude : 86.78073120117188
file name : Image_02052024134910780.png
|
2024-05-02 13:49:10.860388 |
458 |
90353185 |
Creation of drainage channel for management of grey water |
99000 |
construction of drain at raghunathpur II |
Roof laid |
-
latitude : 23.209720611572266
Longitude : 86.78073120117188
file name : Image_02052024134901909.png
|
2024-05-02 13:49:01.992661 |
459 |
90353185 |
Creation of drainage channel for management of grey water |
99000 |
construction of drain at raghunathpur II |
Plinth level |
-
latitude : 23.209720611572266
Longitude : 86.78073120117188
file name : Image_02052024134045947.png
|
2024-05-02 13:40:46.02177 |
460 |
90353185 |
Creation of drainage channel for management of grey water |
99000 |
construction of drain at raghunathpur II |
Completion of work |
-
latitude : 23.21011734008789
Longitude : 86.7799072265625
file name : Image_02052024130918968.png
|
2024-05-02 13:09:19.063906 |
461 |
90353185 |
Creation of drainage channel for management of grey water |
99000 |
construction of drain at raghunathpur II |
Completion of work |
-
latitude : 23.21011734008789
Longitude : 86.7799072265625
file name : Image_02052024130903698.png
|
2024-05-02 13:09:03.781706 |
462 |
90352965 |
Creation of drainage channel for management of grey water |
99000 |
CONSTRUCTION OF DRAIN AT RAGHUNATHPUR I |
Roof laid |
-
latitude : 23.209720611572266
Longitude : 86.78073120117188
file name : Image_02052024134854136.png
|
2024-05-02 13:48:54.20428 |
463 |
90352965 |
Creation of drainage channel for management of grey water |
99000 |
CONSTRUCTION OF DRAIN AT RAGHUNATHPUR I |
Plinth level |
-
latitude : 23.209720611572266
Longitude : 86.78073120117188
file name : Image_02052024134017605.png
|
2024-05-02 13:40:17.678093 |
464 |
90352965 |
Creation of drainage channel for management of grey water |
99000 |
CONSTRUCTION OF DRAIN AT RAGHUNATHPUR I |
Completion of work |
-
latitude : 23.21011734008789
Longitude : 86.7799072265625
file name : Image_02052024130848136.png
|
2024-05-02 13:08:48.217517 |
465 |
95123133 |
Installation of Street Lights |
24750 |
Installation of Street Lights at paine goli |
Roof laid |
-
latitude : 23.229141235351562
Longitude : 86.75415802001953
file name : Image_02052024143142205.png
|
2024-05-02 14:31:42.306392 |
466 |
95123133 |
Installation of Street Lights |
24750 |
Installation of Street Lights at paine goli |
Plinth level |
-
latitude : 23.229141235351562
Longitude : 86.75415802001953
file name : Image_02052024143002750.png
|
2024-05-02 14:30:02.871382 |
467 |
95123133 |
Installation of Street Lights |
24750 |
Installation of Street Lights at paine goli |
Completion of work |
-
latitude : 23.229141235351562
Longitude : 86.75415802001953
file name : Image_02052024140417490.png
|
2024-05-02 14:04:17.603065 |
468 |
95157962 |
Drainage Construction |
99000 |
CONSTRUCTION OF DRAIN AT SIMAKANALI |
Roof laid |
-
latitude : 23.180419921875
Longitude : 86.7574691772461
file name : Image_19032024151149301.png
|
2024-03-19 15:11:49.776558 |
469 |
95157962 |
Drainage Construction |
99000 |
CONSTRUCTION OF DRAIN AT SIMAKANALI |
Plinth level |
-
latitude : 23.180419921875
Longitude : 86.7574691772461
file name : Image_19032024150958258.png
|
2024-03-19 15:10:00.786507 |
470 |
95157962 |
Drainage Construction |
99000 |
CONSTRUCTION OF DRAIN AT SIMAKANALI |
Completion of work |
-
latitude : 23.180419921875
Longitude : 86.7574691772461
file name : Image_19032024150404685.png
|
2024-03-19 15:04:06.934148 |
471 |
95155893 |
Drainage Construction |
99000 |
drain at raidih |
Roof laid |
-
latitude : 23.229490280151367
Longitude : 86.7499008178711
file name : Image_19032024145838343.png
|
2024-03-19 14:58:38.437453 |
472 |
95155893 |
Drainage Construction |
99000 |
drain at raidih |
Plinth level |
-
latitude : 23.229490280151367
Longitude : 86.7499008178711
file name : Image_19032024145708721.png
|
2024-03-19 14:57:08.819032 |
473 |
95155893 |
Drainage Construction |
99000 |
drain at raidih |
Completion of work |
-
latitude : 23.229490280151367
Longitude : 86.7499008178711
file name : Image_19032024145454418.png
|
2024-03-19 14:54:54.509754 |
474 |
97779523 |
Procurement of Computer Printer, UPS, etc. |
200000 |
Procurement of Computer Printer, UPS, etc.1 |
Roof laid |
-
latitude : 23.203266143798828
Longitude : 86.74251556396484
file name : Image_03102024222623017.png
|
2024-10-03 22:26:23.10964 |
475 |
97779523 |
Procurement of Computer Printer, UPS, etc. |
200000 |
Procurement of Computer Printer, UPS, etc.1 |
Plinth level |
-
latitude : 23.20292854309082
Longitude : 86.74247741699219
file name : Image_22082024085312904.png
|
2024-08-22 08:53:13.014599 |
476 |
97779523 |
Procurement of Computer Printer, UPS, etc. |
200000 |
Procurement of Computer Printer, UPS, etc.1 |
Completion of work |
-
latitude : 23.2294979095459
Longitude : 86.74176788330078
file name : Image_31072024162409954.png
|
2024-07-31 16:24:10.057947 |
477 |
56842679 |
CONSTRUCTION OF DRAIN GUARDWALL SATIGHAT BRIDGE TO SAMSAN GHAT |
137684 |
CONSTRUCTION OF DRAIN GUARDWALL SATIGHAT BRIDGE TO SAMSAN GHAT1 |
Roof laid |
-
latitude : 23.179853439331055,23.179853439331055
Longitude : 86.74506378173828,86.74506378173828
file name : Image_11062024142443260.png
|
2024-06-11 14:24:43.354759 |
478 |
56842679 |
CONSTRUCTION OF DRAIN GUARDWALL SATIGHAT BRIDGE TO SAMSAN GHAT |
137684 |
CONSTRUCTION OF DRAIN GUARDWALL SATIGHAT BRIDGE TO SAMSAN GHAT1 |
Plinth level |
-
latitude : 23.179853439331055,23.179853439331055
Longitude : 86.74506378173828,86.74506378173828
file name : Image_11062024142248248.png
|
2024-06-11 14:22:48.353266 |
479 |
56842679 |
CONSTRUCTION OF DRAIN GUARDWALL SATIGHAT BRIDGE TO SAMSAN GHAT |
137684 |
CONSTRUCTION OF DRAIN GUARDWALL SATIGHAT BRIDGE TO SAMSAN GHAT1 |
Completion of work |
-
latitude : 23.179853439331055,23.179853439331055
Longitude : 86.74506378173828,86.74506378173828
file name : Image_11062024142051258.png
|
2024-06-11 14:20:51.369827 |
480 |
95111960 |
Construction of community washing & bathing complex |
99000 |
construction of bathing ghat at kusumtolia |
Roof laid |
-
latitude : 23.188175201416016
Longitude : 86.74684143066406
file name : Image_28032024135728036.png
|
2024-03-28 13:57:28.147405 |
481 |
95111960 |
Construction of community washing & bathing complex |
99000 |
construction of bathing ghat at kusumtolia |
Plinth level |
-
latitude : 23.188175201416016
Longitude : 86.74684143066406
file name : Image_28032024135558585.png
|
2024-03-28 13:55:58.692533 |
482 |
95111960 |
Construction of community washing & bathing complex |
99000 |
construction of bathing ghat at kusumtolia |
Completion of work |
-
latitude : 23.188175201416016
Longitude : 86.74684143066406
file name : Image_28032024135357127.png
|
2024-03-28 13:53:57.238551 |
483 |
67710593 |
Drainage Construction |
99000 |
construction of drain at raghunathpur |
Roof laid |
-
latitude : 23.21555519104004
Longitude : 86.77899932861328
file name : Image_28032024123403261.png
|
2024-03-28 12:34:03.383269 |
484 |
67710593 |
Drainage Construction |
99000 |
construction of drain at raghunathpur |
Plinth level |
-
latitude : 23.21555519104004
Longitude : 86.77899932861328
file name : Image_28032024123137024.png
|
2024-03-28 12:31:37.14145 |
485 |
67710593 |
Drainage Construction |
99000 |
construction of drain at raghunathpur |
Completion of work |
-
latitude : 23.21555519104004
Longitude : 86.77899932861328
file name : Image_28032024122940632.png
|
2024-03-28 12:29:40.752655 |
486 |
67711751 |
Drainage Construction |
29700 |
2 nos soakpit at raghunahpur |
Roof laid |
-
latitude : 23.20595932006836
Longitude : 86.77557373046875
file name : Image_27032024161515916.png
|
2024-03-27 16:15:16.061172 |
487 |
67711751 |
Drainage Construction |
29700 |
2 nos soakpit at raghunahpur |
Plinth level |
-
latitude : 23.20595932006836
Longitude : 86.77557373046875
file name : Image_27032024160849066.png
|
2024-03-27 16:08:49.195397 |
488 |
67711751 |
Drainage Construction |
29700 |
2 nos soakpit at raghunahpur |
Completion of work |
-
latitude : 23.20595932006836
Longitude : 86.77557373046875
file name : Image_27032024160317502.png
|
2024-03-27 16:03:17.629328 |
489 |
95119254 |
Construction of roads |
99000 |
Construction of road at bhagabandh |
Roof laid |
-
latitude : 23.191226959228516,23.191226959228516
Longitude : 86.73426055908203,86.73426055908203
file name : Image_28032024125227898.png
|
2024-03-28 12:52:28.025747 |
490 |
95119254 |
Construction of roads |
99000 |
Construction of road at bhagabandh |
Plinth level |
-
latitude : 23.191226959228516,23.191226959228516
Longitude : 86.73426055908203,86.73426055908203
file name : Image_28032024124737991.png
|
2024-03-28 12:47:38.095475 |
491 |
95119254 |
Construction of roads |
99000 |
Construction of road at bhagabandh |
Completion of work |
-
latitude : 23.191226959228516,23.191226959228516
Longitude : 86.73426055908203,86.73426055908203
file name : Image_28032024124148350.png
|
2024-03-28 12:41:48.471499 |
492 |
95154335 |
Drainage Construction |
99000 |
CONSTRUCTION OF DRAIN AT GHOLKURD SANSAD |
Roof laid |
-
latitude : 23.23107147216797
Longitude : 86.73423767089844
file name : Image_18062024184407324.png
|
2024-06-18 18:44:07.414739 |
493 |
95154335 |
Drainage Construction |
99000 |
CONSTRUCTION OF DRAIN AT GHOLKURD SANSAD |
Plinth level |
-
latitude : 23.23107147216797
Longitude : 86.73423767089844
file name : Image_18062024160543170.png
|
2024-06-18 16:05:43.25822 |
494 |
95154335 |
Drainage Construction |
99000 |
CONSTRUCTION OF DRAIN AT GHOLKURD SANSAD |
Completion of work |
-
latitude : 23.23107147216797
Longitude : 86.73423767089844
file name : Image_18062024160123979.png
|
2024-06-18 16:01:24.061562 |
495 |
96574946 |
Creation of a new source of drinking water |
94050 |
INSTALLATION OF TUBEWELL AT LAHARIA |
Roof laid |
-
latitude : 23.186779022216797
Longitude : 86.7387924194336
file name : Image_18062024155857214.png
|
2024-06-18 15:58:57.296247 |
496 |
96574946 |
Creation of a new source of drinking water |
94050 |
INSTALLATION OF TUBEWELL AT LAHARIA |
Plinth level |
-
latitude : 23.186779022216797
Longitude : 86.7387924194336
file name : Image_18062024155716745.png
|
2024-06-18 15:57:16.826023 |
497 |
96574946 |
Creation of a new source of drinking water |
94050 |
INSTALLATION OF TUBEWELL AT LAHARIA |
Completion of work |
-
latitude : 23.186779022216797
Longitude : 86.7387924194336
file name : Image_18062024155443279.png
|
2024-06-18 15:54:43.360791 |
498 |
67750532 |
Drainage Construction |
99000 |
Construction of Drain at Chhirudih Chandanpur Sansad |
Roof laid |
-
latitude : 23.225605010986328
Longitude : 86.74708557128906
file name : Image_23112023153131382.png
|
2023-11-23 15:31:31.46286 |
499 |
67750532 |
Drainage Construction |
99000 |
Construction of Drain at Chhirudih Chandanpur Sansad |
Plinth level |
-
latitude : 23.225643157958984
Longitude : 86.7469482421875
file name : Image_23112023141030399.png
|
2023-11-23 14:10:30.480472 |
500 |
67750532 |
Drainage Construction |
99000 |
Construction of Drain at Chhirudih Chandanpur Sansad |
Completion of work |
-
latitude : 23.225643157958984
Longitude : 86.7469482421875
file name : Image_23112023140557902.png
|
2023-11-23 14:05:57.985821 |
501 |
96583599 |
Creation of a new source of drinking water |
287490 |
INSTALLATION OF SOLAR PUMP AT DEBAGRAM NAMOPARA |
Roof laid |
-
latitude : 23.174331665039062
Longitude : 86.74606323242188
file name : Image_31072024072217721.png
|
2024-07-31 07:22:17.804445 |
502 |
96583599 |
Creation of a new source of drinking water |
287490 |
INSTALLATION OF SOLAR PUMP AT DEBAGRAM NAMOPARA |
Plinth level |
-
latitude : 23.17439842224121
Longitude : 86.7460708618164
file name : Image_31072024070944773.png
|
2024-07-31 07:09:44.853388 |
503 |
96583599 |
Creation of a new source of drinking water |
287490 |
INSTALLATION OF SOLAR PUMP AT DEBAGRAM NAMOPARA |
Completion of work |
-
latitude : 23.174816131591797
Longitude : 86.74637603759766
file name : Image_25062024143317573.png
|
2024-06-25 14:33:17.663445 |
504 |
96584358 |
Creation of a new source of drinking water |
258265 |
solar pump at chhatapathor |
Roof laid |
-
latitude : 23.2294979095459
Longitude : 86.74176788330078
file name : Image_31072024150128998.png
|
2024-07-31 15:01:29.08896 |
505 |
96584358 |
Creation of a new source of drinking water |
258265 |
solar pump at chhatapathor |
Plinth level |
-
latitude : 23.2294979095459
Longitude : 86.74176788330078
file name : Image_31072024145808700.png
|
2024-07-31 14:58:08.799095 |
506 |
96584358 |
Creation of a new source of drinking water |
258265 |
solar pump at chhatapathor |
Completion of work |
-
latitude : 23.22909164428711
Longitude : 86.74224090576172
file name : Image_25062024143136291.png
|
2024-06-25 14:31:36.383409 |
507 |
95117457 |
Construction of roads |
107415 |
Construction of pcc road at chhirudih |
Roof laid |
-
latitude : 23.229503631591797,23.229503631591797
Longitude : 86.75352478027344,86.75352478027344
file name : Image_25062024133513569.png
|
2024-06-25 13:35:13.642707 |
508 |
95117457 |
Construction of roads |
107415 |
Construction of pcc road at chhirudih |
Plinth level |
-
latitude : 23.229503631591797,23.229503631591797
Longitude : 86.75352478027344,86.75352478027344
file name : Image_25062024132951147.png
|
2024-06-25 13:29:51.221556 |
509 |
95117457 |
Construction of roads |
107415 |
Construction of pcc road at chhirudih |
Completion of work |
-
latitude : 23.229503631591797,23.229503631591797
Longitude : 86.75352478027344,86.75352478027344
file name : Image_25062024132720033.png
|
2024-06-25 13:27:20.108091 |
510 |
67709202 |
Construction of roads |
99000 |
Construction of pcc road at paruda village |
Roof laid |
-
latitude : 23.229475021362305,23.229475021362305
Longitude : 86.75,86.75
file name : Image_12042024152451582.png
|
2024-04-12 15:24:51.665834 |
511 |
67709202 |
Construction of roads |
99000 |
Construction of pcc road at paruda village |
Plinth level |
-
latitude : 23.229475021362305,23.229475021362305
Longitude : 86.75,86.75
file name : Image_09042024153941200.png
|
2024-04-09 15:39:41.28285 |
512 |
67709202 |
Construction of roads |
99000 |
Construction of pcc road at paruda village |
Completion of work |
-
latitude : 23.229475021362305,23.229475021362305
Longitude : 86.75,86.75
file name : Image_09042024153606114.png
|
2024-04-09 15:36:06.203547 |
513 |
97782454 |
Construction/Maintenenace/Upgradation of Segregation Unit |
100000 |
Construction/Maintenenace/Upgradation of Segregation Unit1 |
|
-
latitude : 23.22979982
Longitude : 86.73304994
file name : Image_23092024102036036.png
|
2024-09-23 10:20:36.127361 |
514 |
96576087 |
Creation of a new source of drinking water |
164825 |
INSTALLATION OF TUBEWELL 02NOS AT JITEN PANDA HOUSE AND CHANDANPUR NAMOPARA |
Roof laid |
-
latitude : 23.225725173950195
Longitude : 86.74708557128906
file name : Image_05072024152050213.png
|
2024-07-05 15:20:50.30254 |
515 |
96576087 |
Creation of a new source of drinking water |
164825 |
INSTALLATION OF TUBEWELL 02NOS AT JITEN PANDA HOUSE AND CHANDANPUR NAMOPARA |
Plinth level |
-
latitude : 23.225725173950195
Longitude : 86.74708557128906
file name : Image_05072024151700478.png
|
2024-07-05 15:17:00.562538 |
516 |
96576087 |
Creation of a new source of drinking water |
164825 |
INSTALLATION OF TUBEWELL 02NOS AT JITEN PANDA HOUSE AND CHANDANPUR NAMOPARA |
Completion of work |
-
latitude : 23.225725173950195
Longitude : 86.74708557128906
file name : Image_05072024151435372.png
|
2024-07-05 15:14:35.468518 |
517 |
96576087 |
Creation of a new source of drinking water |
164825 |
INSTALLATION OF TUBEWELL 02NOS AT JITEN PANDA HOUSE AND CHANDANPUR NAMOPARA |
Completion of work |
-
latitude : 23.225725173950195
Longitude : 86.74708557128906
file name : Image_05072024151052156.png
|
2024-07-05 15:10:52.351341 |
518 |
95155236 |
Drainage Construction |
99000 |
CONSTRUCTION OF DRAIN AT GHOLKURD SIDAGORA |
Roof laid |
-
latitude : 23.240415573120117
Longitude : 86.73526763916016
file name : Image_06072024093117425.png
|
2024-07-06 09:31:17.513715 |
519 |
95155236 |
Drainage Construction |
99000 |
CONSTRUCTION OF DRAIN AT GHOLKURD SIDAGORA |
Plinth level |
-
latitude : 23.240415573120117
Longitude : 86.73526763916016
file name : Image_06072024092848856.png
|
2024-07-06 09:28:48.936029 |
520 |
95155236 |
Drainage Construction |
99000 |
CONSTRUCTION OF DRAIN AT GHOLKURD SIDAGORA |
Completion of work |
-
latitude : 23.240415573120117
Longitude : 86.73526763916016
file name : Image_06072024092521758.png
|
2024-07-06 09:25:21.841535 |
521 |
67750646 |
Drainage Construction |
100000 |
Construction of Drain at Chhirudih Lagadang |
Roof laid |
-
latitude : 23.22901153564453
Longitude : 86.75415802001953
file name : Image_10112023114602960.png
|
2023-11-10 11:46:03.141607 |
522 |
67750646 |
Drainage Construction |
100000 |
Construction of Drain at Chhirudih Lagadang |
Plinth level |
-
latitude : 23.22901153564453
Longitude : 86.75415802001953
file name : Image_10112023114339925.png
|
2023-11-10 11:43:40.007628 |
523 |
67750646 |
Drainage Construction |
100000 |
Construction of Drain at Chhirudih Lagadang |
Completion of work |
-
latitude : 23.22901153564453
Longitude : 86.75415802001953
file name : Image_10112023114031982.png
|
2023-11-10 11:40:32.081102 |
524 |
67750388 |
Drainage Construction |
99000 |
Construction of Drain at Raghunathpur Sansad |
Roof laid |
-
latitude : 23.209165573120117
Longitude : 86.78368377685547
file name : Image_23112023125306722.png
|
2023-11-23 12:53:06.803248 |
525 |
67750388 |
Drainage Construction |
99000 |
Construction of Drain at Raghunathpur Sansad |
Plinth level |
-
latitude : 23.209165573120117
Longitude : 86.78368377685547
file name : Image_23112023124919985.png
|
2023-11-23 12:49:20.063507 |
526 |
67750388 |
Drainage Construction |
99000 |
Construction of Drain at Raghunathpur Sansad |
Completion of work |
-
latitude : 23.209165573120117
Longitude : 86.78368377685547
file name : Image_23112023124438888.png
|
2023-11-23 12:44:38.970998 |
527 |
67707555 |
Construction of roads |
99000 |
CONSTRUCTION OF PCC ROAD NEAR RATION SHOP AT GHOLKURD |
Roof laid |
-
latitude : 23.229816436767578,23.229816436767578
Longitude : 86.73297882080078,86.73297882080078
file name : Image_22122023171847936.png
|
2023-12-22 17:18:48.019555 |
528 |
67707555 |
Construction of roads |
99000 |
CONSTRUCTION OF PCC ROAD NEAR RATION SHOP AT GHOLKURD |
Plinth level |
-
latitude : 23.229816436767578,23.229816436767578
Longitude : 86.73297882080078,86.73297882080078
file name : Image_22122023171644945.png
|
2023-12-22 17:16:45.029733 |
529 |
67707555 |
Construction of roads |
99000 |
CONSTRUCTION OF PCC ROAD NEAR RATION SHOP AT GHOLKURD |
Plinth level |
-
latitude : 23.229816436767578,23.229816436767578
Longitude : 86.73297882080078,86.73297882080078
file name : Image_22122023171123077.png
|
2023-12-22 17:11:23.166993 |
530 |
67707555 |
Construction of roads |
99000 |
CONSTRUCTION OF PCC ROAD NEAR RATION SHOP AT GHOLKURD |
Completion of work |
-
latitude : 23.229816436767578,23.229816436767578
Longitude : 86.73297882080078,86.73297882080078
file name : Image_22122023170641048.png
|
2023-12-22 17:06:41.130497 |
531 |
67719979 |
Water Supply to villages |
74250 |
INSTALLATION OF TUBEWELL AT PURNOGORA NAMOPARA |
Roof laid |
-
latitude : 23.228927612304688
Longitude : 86.75654602050781
file name : Image_22122023160801840.png
|
2023-12-22 16:08:01.933671 |
532 |
67719979 |
Water Supply to villages |
74250 |
INSTALLATION OF TUBEWELL AT PURNOGORA NAMOPARA |
Plinth level |
-
latitude : 23.228927612304688
Longitude : 86.75654602050781
file name : Image_22122023160455296.png
|
2023-12-22 16:04:55.402612 |
533 |
67719979 |
Water Supply to villages |
74250 |
INSTALLATION OF TUBEWELL AT PURNOGORA NAMOPARA |
Completion of work |
-
latitude : 23.228927612304688
Longitude : 86.75654602050781
file name : Image_22122023160134344.png
|
2023-12-22 16:01:34.459454 |
534 |
97785892 |
Creation of a new source of drinking water |
250000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 23.22989613
Longitude : 86.73300356
file name : Image_23092024101939340.png
|
2024-09-23 10:19:39.442005 |
535 |
97785892 |
Creation of a new source of drinking water |
250000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 23.22877694
Longitude : 86.75550211
file name : Image_17072024102641029.png
|
2024-07-17 10:26:41.127026 |
536 |
97785892 |
Creation of a new source of drinking water |
250000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 23.22877677
Longitude : 86.75550773
file name : Image_17072024101607690.png
|
2024-07-17 10:16:07.780312 |
537 |
89878288 |
Creation of a new source of drinking water |
74250 |
tubewell lalpahari |
Roof laid |
-
latitude : 23.2036093
Longitude : 86.7451019
file name : Image_03102024130733400.png
|
2024-10-03 13:07:33.514286 |
538 |
89878288 |
Creation of a new source of drinking water |
74250 |
tubewell lalpahari |
Plinth level |
-
latitude : 23.2036097
Longitude : 86.745101
file name : Image_03102024125059117.png
|
2024-10-03 12:50:59.231953 |
539 |
89878288 |
Creation of a new source of drinking water |
74250 |
tubewell lalpahari |
Completion of work |
-
latitude : 23.2036103
Longitude : 86.7450993
file name : Image_03102024124607081.png
|
2024-10-03 12:46:07.200039 |
540 |
89878467 |
Creation of a new source of drinking water |
74250 |
tubewell chandanpur |
Roof laid |
-
latitude : 23.22484016418457
Longitude : 86.7472915649414
file name : Image_03102024134330830.png
|
2024-10-03 13:43:30.921444 |
541 |
89878467 |
Creation of a new source of drinking water |
74250 |
tubewell chandanpur |
Plinth level |
-
latitude : 23.22484016418457
Longitude : 86.7472915649414
file name : Image_03102024133715891.png
|
2024-10-03 13:37:15.988314 |
542 |
89878467 |
Creation of a new source of drinking water |
74250 |
tubewell chandanpur |
Completion of work |
-
latitude : 23.22484016418457
Longitude : 86.7472915649414
file name : Image_03102024132901065.png
|
2024-10-03 13:29:01.161979 |
543 |
89885188 |
Creation of a new source of drinking water |
74250 |
tubewell murgagora |
Roof laid |
-
latitude : 23.215251922607422
Longitude : 86.78148651123047
file name : Image_03102024140548653.png
|
2024-10-03 14:05:48.78188 |
544 |
89885188 |
Creation of a new source of drinking water |
74250 |
tubewell murgagora |
Plinth level |
-
latitude : 23.215251922607422
Longitude : 86.78148651123047
file name : Image_03102024135929791.png
|
2024-10-03 13:59:29.901104 |
545 |
89885188 |
Creation of a new source of drinking water |
74250 |
tubewell murgagora |
Completion of work |
-
latitude : 23.215251922607422
Longitude : 86.78148651123047
file name : Image_03102024135727916.png
|
2024-10-03 13:57:28.012218 |
546 |
89879282 |
Creation of a new source of drinking water |
74250 |
tubewell mahuladanga |
Roof laid |
-
latitude : 23.17302894592285
Longitude : 86.7468032836914
file name : Image_04102024113153350.png
|
2024-10-04 11:31:53.545612 |
547 |
89879282 |
Creation of a new source of drinking water |
74250 |
tubewell mahuladanga |
Plinth level |
-
latitude : 23.17302894592285
Longitude : 86.7468032836914
file name : Image_04102024113000658.png
|
2024-10-04 11:30:00.779401 |
548 |
89879282 |
Creation of a new source of drinking water |
74250 |
tubewell mahuladanga |
Completion of work |
-
latitude : 23.17302894592285
Longitude : 86.7468032836914
file name : Image_04102024112741384.png
|
2024-10-04 11:27:41.547507 |
549 |
89879770 |
Creation of a new source of drinking water |
74250 |
tubewell tamlipara |
Roof laid |
-
latitude : 23.18720054626465
Longitude : 86.75121307373047
file name : Image_04102024122104457.png
|
2024-10-04 12:21:04.534772 |
550 |
89879770 |
Creation of a new source of drinking water |
74250 |
tubewell tamlipara |
Plinth level |
-
latitude : 23.18720054626465
Longitude : 86.75121307373047
file name : Image_04102024121527940.png
|
2024-10-04 12:15:28.053494 |
551 |
89879770 |
Creation of a new source of drinking water |
74250 |
tubewell tamlipara |
Completion of work |
-
latitude : 23.18720054626465
Longitude : 86.75121307373047
file name : Image_04102024121108881.png
|
2024-10-04 12:11:08.960962 |
552 |
89835288 |
Creation of a new source of drinking water |
74250 |
tubewell bhagabandh |
Roof laid |
-
latitude : 23.173465728759766
Longitude : 86.71329498291016
file name : Image_04102024123928526.png
|
2024-10-04 12:39:28.633235 |
553 |
89835288 |
Creation of a new source of drinking water |
74250 |
tubewell bhagabandh |
Plinth level |
-
latitude : 23.173465728759766
Longitude : 86.71329498291016
file name : Image_04102024123629262.png
|
2024-10-04 12:36:29.371684 |
554 |
89835288 |
Creation of a new source of drinking water |
74250 |
tubewell bhagabandh |
Completion of work |
-
latitude : 23.173465728759766
Longitude : 86.71329498291016
file name : Image_04102024123058246.png
|
2024-10-04 12:30:58.350362 |
555 |
89830256 |
Construction of community washing & bathing complex |
99000 |
CONSTRUCTION OF BATHING GHAT AT LAYEK BANDH |
Roof laid |
-
latitude : 23.184471130371094
Longitude : 86.75216674804688
file name : Image_20072024183517904.png
|
2024-07-20 18:35:17.995903 |
556 |
89830256 |
Construction of community washing & bathing complex |
99000 |
CONSTRUCTION OF BATHING GHAT AT LAYEK BANDH |
Plinth level |
-
latitude : 23.184534072875977
Longitude : 86.75218963623047
file name : Image_20072024182451551.png
|
2024-07-20 18:24:51.648142 |
557 |
89830256 |
Construction of community washing & bathing complex |
99000 |
CONSTRUCTION OF BATHING GHAT AT LAYEK BANDH |
Completion of work |
-
latitude : 23.184566497802734
Longitude : 86.7521743774414
file name : Image_20072024181247497.png
|
2024-07-20 18:12:47.592881 |
558 |
89830256 |
Construction of community washing & bathing complex |
99000 |
CONSTRUCTION OF BATHING GHAT AT LAYEK BANDH |
Completion of work |
-
latitude : 23.184566497802734
Longitude : 86.7521743774414
file name : Image_20072024181256105.png
|
2024-07-20 18:12:56.196813 |
559 |
89828792 |
Construction of community washing & bathing complex |
79200 |
CONSTRUCTION OF BATHING GHAT AT BARABANDH |
Roof laid |
-
latitude : 23.22636604309082
Longitude : 86.74852752685547
file name : Image_20072024183312988.png
|
2024-07-20 18:33:13.086819 |
560 |
89828792 |
Construction of community washing & bathing complex |
79200 |
CONSTRUCTION OF BATHING GHAT AT BARABANDH |
Plinth level |
-
latitude : 23.22636604309082
Longitude : 86.74852752685547
file name : Image_20072024182546378.png
|
2024-07-20 18:25:46.485349 |
561 |
89828792 |
Construction of community washing & bathing complex |
79200 |
CONSTRUCTION OF BATHING GHAT AT BARABANDH |
Completion of work |
-
latitude : 23.22625732421875
Longitude : 86.74838256835938
file name : Image_20072024181243591.png
|
2024-07-20 18:12:43.685628 |
562 |
89823686 |
Construction of roads |
99000 |
CONSTRUCTION OF PCC ROAD AT KENDBANI VILLAGE |
Roof laid |
-
latitude : 23.203880310058594,23.203880310058594
Longitude : 86.72437286376953,86.72437286376953
file name : Image_20072024183415542.png
|
2024-07-20 18:34:15.644823 |
563 |
89823686 |
Construction of roads |
99000 |
CONSTRUCTION OF PCC ROAD AT KENDBANI VILLAGE |
Plinth level |
-
latitude : 23.203840255737305,23.203840255737305
Longitude : 86.72440338134766,86.72440338134766
file name : Image_20072024182357267.png
|
2024-07-20 18:23:57.375444 |
564 |
89823686 |
Construction of roads |
99000 |
CONSTRUCTION OF PCC ROAD AT KENDBANI VILLAGE |
Completion of work |
-
latitude : 23.203840255737305,23.203840255737305
Longitude : 86.72440338134766,86.72440338134766
file name : Image_20072024181300334.png
|
2024-07-20 18:13:00.41956 |
565 |
89823686 |
Construction of roads |
99000 |
CONSTRUCTION OF PCC ROAD AT KENDBANI VILLAGE |
Completion of work |
-
latitude : 23.203840255737305,23.203840255737305
Longitude : 86.72440338134766,86.72440338134766
file name : Image_20072024181252042.png
|
2024-07-20 18:12:52.127077 |
566 |
67724631 |
Water Supply to villages |
240000 |
INSTALLATION OF SOLAR PUMP WITH DEEP BORING AT PORADIH VILLAGE |
Plinth level |
-
latitude : 23.18541145324707
Longitude : 86.75260162353516
file name : Image_30122023114309222.png
|
2023-12-30 11:43:09.316396 |
567 |
67724631 |
Water Supply to villages |
240000 |
INSTALLATION OF SOLAR PUMP WITH DEEP BORING AT PORADIH VILLAGE |
Completion of work |
-
latitude : 23.18541145324707
Longitude : 86.75260162353516
file name : Image_30122023114109787.png
|
2023-12-30 11:41:09.880463 |
568 |
89830752 |
Construction of community washing & bathing complex |
79200 |
CONSTRUCTION OF BATHING GHAT AT SIMAKANALI BARAPUKUR |
Roof laid |
-
latitude : 23.179975509643555
Longitude : 86.75827026367188
file name : Image_31072024071932741.png
|
2024-07-31 07:19:32.829601 |
569 |
89830752 |
Construction of community washing & bathing complex |
79200 |
CONSTRUCTION OF BATHING GHAT AT SIMAKANALI BARAPUKUR |
Plinth level |
-
latitude : 23.179975509643555
Longitude : 86.75827026367188
file name : Image_31072024071754976.png
|
2024-07-31 07:17:55.071026 |
570 |
89830752 |
Construction of community washing & bathing complex |
79200 |
CONSTRUCTION OF BATHING GHAT AT SIMAKANALI BARAPUKUR |
Completion of work |
-
latitude : 23.179975509643555
Longitude : 86.75827026367188
file name : Image_31072024071207344.png
|
2024-07-31 07:12:07.437999 |
571 |
89824519 |
Construction of roads |
99000 |
CONSTRUCTION OF PCC ROAD AT PORADIH 1 NO SANSAD |
Roof laid |
-
latitude : 23.186552047729492,23.186552047729492
Longitude : 86.75164794921875,86.75164794921875
file name : Image_31072024124404045.png
|
2024-07-31 12:44:04.593676 |
572 |
89824519 |
Construction of roads |
99000 |
CONSTRUCTION OF PCC ROAD AT PORADIH 1 NO SANSAD |
Plinth level |
-
latitude : 23.186538696289062,23.186538696289062
Longitude : 86.7515869140625,86.7515869140625
file name : Image_31072024123632827.png
|
2024-07-31 12:36:32.926786 |
573 |
89824519 |
Construction of roads |
99000 |
CONSTRUCTION OF PCC ROAD AT PORADIH 1 NO SANSAD |
Completion of work |
-
latitude : 23.186538696289062,23.186538696289062
Longitude : 86.7515869140625,86.7515869140625
file name : Image_31072024122020615.png
|
2024-07-31 12:20:20.723618 |
574 |
89824519 |
Construction of roads |
99000 |
CONSTRUCTION OF PCC ROAD AT PORADIH 1 NO SANSAD |
Completion of work |
-
latitude : 23.186538696289062,23.186538696289062
Longitude : 86.7515869140625,86.7515869140625
file name : Image_31072024122029148.png
|
2024-07-31 12:20:29.250598 |
575 |
89829148 |
Construction of community washing & bathing complex |
99000 |
CONSTRUCTION OF BATHING GHAT AT PORADIH II NO SANSAD |
Roof laid |
-
latitude : 23.188823699951172
Longitude : 86.75331115722656
file name : Image_31072024124033128.png
|
2024-07-31 12:40:33.215468 |
576 |
89829148 |
Construction of community washing & bathing complex |
99000 |
CONSTRUCTION OF BATHING GHAT AT PORADIH II NO SANSAD |
Roof laid |
-
latitude : 23.188823699951172
Longitude : 86.75331115722656
file name : Image_31072024124205952.png
|
2024-07-31 12:42:06.034767 |
577 |
89829148 |
Construction of community washing & bathing complex |
99000 |
CONSTRUCTION OF BATHING GHAT AT PORADIH II NO SANSAD |
Plinth level |
-
latitude : 23.188823699951172
Longitude : 86.75331115722656
file name : Image_31072024123721271.png
|
2024-07-31 12:37:21.390042 |
578 |
89829148 |
Construction of community washing & bathing complex |
99000 |
CONSTRUCTION OF BATHING GHAT AT PORADIH II NO SANSAD |
Completion of work |
-
latitude : 23.188711166381836
Longitude : 86.75333404541016
file name : Image_31072024122015211.png
|
2024-07-31 12:20:15.300839 |
579 |
67733753 |
Drainage Construction |
99000 |
Construction of Drain at Bhagabandh |
Roof laid |
-
latitude : 23.177505493164062
Longitude : 86.72894287109375
file name : Image_15122023151259171.png
|
2023-12-15 15:12:59.271018 |
580 |
67733753 |
Drainage Construction |
99000 |
Construction of Drain at Bhagabandh |
Plinth level |
-
latitude : 23.177505493164062
Longitude : 86.72894287109375
file name : Image_15122023151013696.png
|
2023-12-15 15:10:13.78262 |
581 |
67733753 |
Drainage Construction |
99000 |
Construction of Drain at Bhagabandh |
Completion of work |
-
latitude : 23.177505493164062
Longitude : 86.72894287109375
file name : Image_15122023150701785.png
|
2023-12-15 15:07:01.87695 |
582 |
67713240 |
Drainage Construction |
29700 |
2nos soakpit at murgagora |
Roof laid |
-
latitude : 23.215274810791016
Longitude : 86.78268432617188
file name : Image_27032024155534865.png
|
2024-03-27 15:55:34.972822 |
583 |
67713240 |
Drainage Construction |
29700 |
2nos soakpit at murgagora |
Plinth level |
-
latitude : 23.215274810791016
Longitude : 86.78268432617188
file name : Image_27032024155036509.png
|
2024-03-27 15:50:36.619552 |
584 |
67713240 |
Drainage Construction |
29700 |
2nos soakpit at murgagora |
Completion of work |
-
latitude : 23.215274810791016
Longitude : 86.78268432617188
file name : Image_27032024154737898.png
|
2024-03-27 15:47:38.011872 |
585 |
89834396 |
Drainage Construction |
99000 |
drain at baurigora |
Roof laid |
-
latitude : 23.203392028808594
Longitude : 86.75050354003906
file name : Image_14112024151427271.png
|
2024-11-14 15:14:27.360537 |
586 |
89834396 |
Drainage Construction |
99000 |
drain at baurigora |
Plinth level |
-
latitude : 23.203392028808594
Longitude : 86.75050354003906
file name : Image_14112024151158473.png
|
2024-11-14 15:11:58.591743 |
587 |
89834396 |
Drainage Construction |
99000 |
drain at baurigora |
Completion of work |
-
latitude : 23.203392028808594
Longitude : 86.75050354003906
file name : Image_14112024145930450.png
|
2024-11-14 14:59:30.553756 |
588 |
89821644 |
Construction of roads |
99000 |
CONSTRUCTION OF PCC ROAD AT CHANDANPUR GORAI PARA |
Roof laid |
-
latitude : 23.224681854248047,23.224681854248047
Longitude : 86.74710845947266,86.74710845947266
file name : Image_14112024162219972.png
|
2024-11-14 16:22:20.070297 |
589 |
89821644 |
Construction of roads |
99000 |
CONSTRUCTION OF PCC ROAD AT CHANDANPUR GORAI PARA |
Plinth level |
-
latitude : 23.224681854248047,23.224681854248047
Longitude : 86.74710845947266,86.74710845947266
file name : Image_14112024161957369.png
|
2024-11-14 16:19:57.465268 |
590 |
89821644 |
Construction of roads |
99000 |
CONSTRUCTION OF PCC ROAD AT CHANDANPUR GORAI PARA |
Completion of work |
-
latitude : 23.224681854248047,23.224681854248047
Longitude : 86.74710845947266,86.74710845947266
file name : Image_14112024161636121.png
|
2024-11-14 16:16:36.23567 |
591 |
89550322 |
Construction of roads |
69300 |
Construction of pcc road at gholkurd |
Roof laid |
-
latitude : 23.227243423461914,23.227243423461914
Longitude : 86.73255920410156,86.73255920410156
file name : Image_14112024152419801.png
|
2024-11-14 15:24:19.936922 |
592 |
89550322 |
Construction of roads |
69300 |
Construction of pcc road at gholkurd |
Roof laid |
-
latitude : 23.227243423461914,23.227243423461914
Longitude : 86.73255920410156,86.73255920410156
file name : Image_14112024152229926.png
|
2024-11-14 15:22:30.021572 |
593 |
89550322 |
Construction of roads |
69300 |
Construction of pcc road at gholkurd |
Plinth level |
-
latitude : 23.227243423461914,23.227243423461914
Longitude : 86.73255920410156,86.73255920410156
file name : Image_14112024151851396.png
|
2024-11-14 15:18:51.492796 |
594 |
89550322 |
Construction of roads |
69300 |
Construction of pcc road at gholkurd |
Completion of work |
-
latitude : 23.227243423461914,23.227243423461914
Longitude : 86.73255920410156,86.73255920410156
file name : Image_14112024151703314.png
|
2024-11-14 15:17:03.415735 |
595 |
89885026 |
Creation of a new source of drinking water |
74250 |
tubewell at simakanali |
Roof laid |
-
latitude : 23.182466506958008
Longitude : 86.75959014892578
file name : Image_14112024153832963.png
|
2024-11-14 15:38:33.139086 |
596 |
89885026 |
Creation of a new source of drinking water |
74250 |
tubewell at simakanali |
Plinth level |
-
latitude : 23.182466506958008
Longitude : 86.75959014892578
file name : Image_14112024153449191.png
|
2024-11-14 15:34:49.30597 |
597 |
89885026 |
Creation of a new source of drinking water |
74250 |
tubewell at simakanali |
Completion of work |
-
latitude : 23.182466506958008
Longitude : 86.75959014892578
file name : Image_14112024153111974.png
|
2024-11-14 15:31:12.092294 |
598 |
89832646 |
Drainage Construction |
99000 |
drain at bhagabandh |
Roof laid |
-
latitude : 23.178579330444336
Longitude : 86.72949981689453
file name : Image_14112024161010530.png
|
2024-11-14 16:10:10.633531 |
599 |
89832646 |
Drainage Construction |
99000 |
drain at bhagabandh |
Roof laid |
-
latitude : 23.178579330444336
Longitude : 86.72949981689453
file name : Image_14112024161108530.png
|
2024-11-14 16:11:08.720526 |
600 |
89832646 |
Drainage Construction |
99000 |
drain at bhagabandh |
Plinth level |
-
latitude : 23.178579330444336
Longitude : 86.72949981689453
file name : Image_14112024160328510.png
|
2024-11-14 16:03:28.584529 |
601 |
89832646 |
Drainage Construction |
99000 |
drain at bhagabandh |
Completion of work |
-
latitude : 23.178579330444336
Longitude : 86.72949981689453
file name : Image_14112024154951330.png
|
2024-11-14 15:49:51.421289 |
602 |
89821917 |
Construction of roads |
59400 |
CONSTRUCTION OF PCC ROAD AT PAYKA FROM MAIN ROAD TO ARABINDA ROY HOUSE |
Roof laid |
-
latitude : 23.238618850708008,23.238618850708008
Longitude : 86.75248718261719,86.75248718261719
file name : Image_18112024155719993.png
|
2024-11-18 15:57:20.197373 |
603 |
89821917 |
Construction of roads |
59400 |
CONSTRUCTION OF PCC ROAD AT PAYKA FROM MAIN ROAD TO ARABINDA ROY HOUSE |
Plinth level |
-
latitude : 23.238618850708008,23.238618850708008
Longitude : 86.75248718261719,86.75248718261719
file name : Image_18112024154619906.png
|
2024-11-18 15:46:19.986674 |
604 |
89821917 |
Construction of roads |
59400 |
CONSTRUCTION OF PCC ROAD AT PAYKA FROM MAIN ROAD TO ARABINDA ROY HOUSE |
Completion of work |
-
latitude : 23.238618850708008,23.238618850708008
Longitude : 86.75248718261719,86.75248718261719
file name : Image_18112024154453392.png
|
2024-11-18 15:44:53.492195 |
605 |
92684699 |
Construction of Sheds |
99000 |
Construction of Sheds at Poradih |
Roof laid |
-
latitude : 23.188175201416016
Longitude : 86.74954986572266
file name : Image_02052024130353429.png
|
2024-05-02 13:03:53.525897 |
606 |
92684699 |
Construction of Sheds |
99000 |
Construction of Sheds at Poradih |
Plinth level |
-
latitude : 23.188175201416016
Longitude : 86.74954986572266
file name : Image_02052024125833217.png
|
2024-05-02 12:58:33.316525 |
607 |
92684699 |
Construction of Sheds |
99000 |
Construction of Sheds at Poradih |
Completion of work |
-
latitude : 23.188175201416016
Longitude : 86.74954986572266
file name : Image_02052024124340634.png
|
2024-05-02 12:43:40.735717 |